WorldWideScience

Sample records for inspection stations

  1. 47 CFR 80.1067 - Inspection of station.

    Science.gov (United States)

    2010-10-01

    ... Inspection of station. (a) Ships must have the required equipment inspected at least once every 12 months by an FCC-licensed technician holding a GMDSS Radio Maintainer's License. If the ship passes the... 47 Telecommunication 5 2010-10-01 2010-10-01 false Inspection of station. 80.1067 Section 80.1067...

  2. 47 CFR 80.79 - Inspection of ship station by a foreign Government.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Inspection of ship station by a foreign... Requirements-Ship Stations § 80.79 Inspection of ship station by a foreign Government. The Governments or appropriate administrations of countries which a ship visits may require the license of the ship station or...

  3. Improvement and optimization for in-service inspection of M310 nuclear power station

    International Nuclear Information System (INIS)

    Wang Chen; Sun Haitao; Gao Chen; Deng Dong

    2015-01-01

    In-service inspection (ISI) is an important method to ensure the safety of the mechanical equipment in nuclear power stations. According to the in-service inspection experience feedback from the domestic nuclear power stations, the reasonableness of some provisions in the RSE-M code are discussed and the applications of risk-informed in-service inspection (RI-ISI) are introduced, and the advices for the optimization of the ISI of the domestic M310 nuclear power stations are proposed. (authors)

  4. Periodical inspection in nuclear power stations

    International Nuclear Information System (INIS)

    1986-01-01

    Periodical inspection is presently being made of eight nuclear power plants in nuclear power stations. Up to the present time, in three of them, failures as follows have been observed. (1) Unit 3 (PWR) of the Mihama Power Station in The Kansai Electric Power Co., Inc. Nineteen heat-transfer tubes of the steam generators were plugged up due to failure. A fuel assembly with a failed spring fixture and in another the control-rod cluster with a failed control rod fixture were replaced. (2) Unit 2 (PWR) of the Oi Power Station in The Kansai Electric Power Co., Inc. Eight heat-transfer tubes of the heat exchangers were plugged up due to failure. (3) Unit 6 (BWR) of the Fukushima Nuclear Power Station I in The Tokyo Electric Power Co., Inc. A fuel assembly with leakage was replaced. (Mori, K.)

  5. Automated ultrasonic inspection system for nuclear power stations

    International Nuclear Information System (INIS)

    Anon.

    1976-01-01

    The automated system of ultrasonic inspection which was used to conduct weld inspections of the complex primary system of the Borselle PWR station is described. It relies upon mechanically traversing purpose designed multi-crystal ultrasonic probes along the welds. A number of probes are switched sequentially to provide a continuous scan. A typical scan rate of 120 scan/sec is achieved by a multiplexer capable of switching transmitter and receiver individually. The system has wide applications in other industries. (U.K.)

  6. 47 CFR 73.3527 - Local public inspection file of noncommercial educational stations.

    Science.gov (United States)

    2010-10-01

    ... main studio and public file outside its community of license shall: (i) Make available to persons... 47 Telecommunication 4 2010-10-01 2010-10-01 false Local public inspection file of noncommercial... public inspection file of noncommercial educational stations. (a) Responsibility to maintain a file. The...

  7. Risk-based Inspection Guide for the Susquehanna Station HPCI system

    International Nuclear Information System (INIS)

    Travis, R.; Higgins, J.; Gunther, W.; Shier, W.

    1992-11-01

    The High Pressure Coolant Injection (HPCI) system has been examined from a risk perspective. A system Risk-based Inspection Guide (S-RIG) has been developed as an aid to HPCI system inspections at the Susquehanna Steam Electric Station (SSES) which is operated by Pennsylvania Power ampersand Light (PP ampersand L). Included in this S-RIG is a discussion of the role of HPCI in mitigating accidents and a presentation of PRA-based failure modes which could prevent proper operation of the system. The S-RIG uses industry operating experience, including plant-specific illustrative examples, to augment the basic PRA failure modes. It is designed to be used as a reference for both routine inspections and the evaluation of the significance of component failures

  8. Recent advances in automated ultrasonic inspection of Magnox power stations

    International Nuclear Information System (INIS)

    Wooldridge, A.B.

    2006-01-01

    Magnox Electric operates a number of Magnox nuclear power stations, some of which have presented difficult inspection challenges. This paper will describe recent advances in automated ultrasonic techniques which have enabled additional, fully effective and qualified inspections to be introduced. The examples chosen involve phased array inspection of fillet welds and the introduction of 3D data display and analysis using NDT Workbench. Ultrasonic phased arrays have been optimised for inspection of fillet welded structures where physical access for the operator is very awkward and the surfaces available for probe scanning are very restricted. In addition to controlling the beam direction and focus depth, the systems have also optimised the depth of field by varying the number of phased array elements fired at a given time. These phased array inspections are substantially superior in quality, reliability and speed compared with that achievable by conventional manual inspection. Analysis of automated ultrasonic data can be very time-consuming if defects are complex. NDT Workbench significantly improves data analysis for complex geometries and defects primarily because of the 3D data displays of multiple beams and automated logging of measurements. This system has been used in 2005 for data analysis of complex defects where sizing accuracy was particularly important. Both these inspection procedures have been formally qualified using the ENIQ (European Network for Inspection Qualification) Methodology. Such qualification was achieved more easily because of the rigorous in house training programmes established in each case and because the Technical Justifications referred to evidence from previous related qualifications whenever appropriate. The timely achievement of inspection qualification demonstrates that the new systems have reached sufficient maturity to be used with confidence for high quality inspections. (orig.)

  9. Safety procedures in operation of inspection and maintenance of pressure reduction and metering stations

    International Nuclear Information System (INIS)

    Villas Boas, Ademar Jose; Biesemeyer, Marco Aurelio R.

    2000-01-01

    Each local Natural Gas Distribution Company in Brazil has its own working procedures for operations of inspection and maintenance on equipment and accessories connected to the gas network. Some of these Companies developed a better elaborated and documented way of working routines, while others only work based on their operators experience. The objective of this work is to create a standard procedure for operations of inspection and maintenance of Pressure Reducing Stations and Metering Stations, mainly the ones concerned to safety aspects. This work has no intention of exhausting all aspects related to this subject but to become the first step to standardize these types of operations among Natural Gas Distribution Companies. (author)

  10. Design and implementation of check out station for large container inspection system

    International Nuclear Information System (INIS)

    Yao Dongsheng; Gao Wenhuan; Kang Kejun

    1997-01-01

    In Large Container Inspection System (LCIS), Check Out Station (COS) is in charge of deciding whether a container is allowed to pass or has to be opened for checking. Several different top level architecture designs for COS are discussed and analyzed according to the practical requirements of COS

  11. Automatic ultrasonic pre-service, and in-service inspection of pressurized components of the primary circuit of nuclear power stations

    International Nuclear Information System (INIS)

    Muller, G.P.; Hallermeier, L.; Heinrich, D.; Grabendorfer, W.; Rebrmann, M.

    1985-01-01

    Ultrasonic pre-service and especially in-service inspection activities on the primary circuit of nuclear power stations form an essential part of the maintenance work that must be performed throughout the lifetime to ensure plant integrity. Consequently, the equipment required to carry out these inspections must be continuously improved in respect of reliability, safety, accuracy and ease of handling in order to minimize disturbances and repairs and reduce radiation exposure of the personnel. The authors' discussion of technique, equipment and performance of automated ultrasonic inspection is based on 15 years of experience in the testing of components of the primary circuit in nuclear power stations. To cover all inspection areas of the RPV of a PWR, four different manipulators are required, two for the closure head, one for the studs and one for the cylindrical shell and bottom closure. The use of the newly developed equipment, which naturally meets all the recommendations of the licensing authorities, allows for the automatic inspection of the components of primary circuit of nuclear power stations and the thus helps to substantially decrease the radiation exposure of the personnel. All the manipulators and their control consoles were designed and manufactured by M.A.N., Nuremberg while the ultrasonic electronic system was developed by Krautkramer, Cologne

  12. Eddy current magnetic bias x-probe qualification and inspection of steam generator Monel 400 tubing in Pickering Nuclear Generating Station

    International Nuclear Information System (INIS)

    Lepine, B.A.; Van Langen, J.; Obrutsky, L.

    2006-01-01

    This paper presents an overview of the x-probe MB 350 eddy current inspection array probe, for detection of open OD axial crack-like flaws in Monel 400 tubes at Pickering Nuclear Generating Station. This report contains a selection of inspection results from the field inspections performed with this probe during the 2003 and 2004 period at Pickering Nuclear Generating Station A and B. During the 2003 in-service eddy current inspection results of Pickering Nuclear Generating Station A (PNGS-A) Unit 2, a 13 mm (0.5 inch) long axial indication was detected by the CTR1 bobbin and CTR2-C4 array probes in Tube R25-C52 of Steam Generator (SG) 11 in the hot leg sludge pile region. An experimental magnetic bias X-probe, specially designed by Zetec for inspection of Monel 400 tubing, was deployed and the indication was characterized as a potential out diameter (OD) axially oriented crack. Post-inspection tube pulling and destructive examination confirmed the presence of an Environmentally Assisted Crack (EAC), approximately 80% deep and 13mm long. Due to the significance of this discovery, Ontario Power Generation (OPG) requested AECL to initiate a program for qualification of the X-probe MB 350 for the detection of OD axial cracks in medium to high magnetic permeability μ r Monel 400 PNGS-A and B steam generator tubing at different locations. The X-probe MB 350 subsequently has been deployed as a primary inspection probe for crack detection for PNGS steam generators. (author)

  13. Eddy current automatic inspection of heat exchangers in nuclear power stations

    International Nuclear Information System (INIS)

    Cazal, M.; Scopelliti, J.D.; Mendez, J.

    1997-01-01

    This presentation describes the eddy current tube inspection techniques for heavy heat exchangers in nuclear power stations. The purpose of these eddy current tests, is first to determine the integrity of the heat exchanger tubes, and to characterize the related types of defects in each case following to their analysis and cause determination and subsequent inspection planning. This task requires a group highly qualified personnel with high tech automate equipment. The organization of the group required a correct function and task assignment in order to achieve efficiency in scheduling, with simultaneous inspection to different components in a continuous base and uninterruptedly. A lead specialist is in charge of the group, which is set up by several shift supervisors, a qualified tele manipulator installation crew a number of qualified tele manipulator operators, and the specialist for data acquisition and certified eddy current signal evaluators plus some other support technicians and administrations helpers. In order to comply with inspection requirements, a bunch of technical procedures had to be developed. The following equipment is available nowadays: Zetec SM-13, SM-23 and SM-22 tele manipulators for inspection probes positioning, with different shapes and configuration (rotating probes, flexible probes for U-Bends, and magnetic saturation probes endowed with their own driving units) and remote data acquisition units identified as MIZ-18 A and MIZ-30, which are remotely operated from a mobile lab installed in a trailer, outside the reactor building. The available equipment allows a simultaneous inspection of three different plant components (two steam generators and a moderator heat exchanger). We are also in a position of performing eddy current tube inspection in more than a NSP at the same time. The Zetec Eddynet software is used in the manipulator operation and for the data acquisition and defect evaluation. This software operates within Windows

  14. 14 CFR 145.223 - FAA inspections.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false FAA inspections. 145.223 Section 145.223... OTHER CERTIFICATED AGENCIES REPAIR STATIONS Operating Rules § 145.223 FAA inspections. (a) A certificated repair station must allow the FAA to inspect that repair station at any time to determine...

  15. Results of the 5th regular inspection of Unit 1 in the Hamaoka Nuclear Power Station

    International Nuclear Information System (INIS)

    1983-01-01

    The 5th regular inspection of Unit 1 in the Hamaoka Nuclear Power Station was carried out from March 27 to July 27, 1982. Inspection was made on the reactor proper, reactor cooling system, instrumentation/control system, radiation control facility, etc. By the examinations of external appearance, leakage, performance, etc., no abnormality was observed. In the regular inspection, personnel exposure dose was all below the permissible level. The works done during the inspection were the following: the replacement of control rod drives, the replacement of core support-plate plugs, the repair of steam piping, steam extraction pipes and feed water heaters, the repair of a waste-liquid concentrator, the installation of barriers and leak detectors, the installation of drain sump monitors in a containment vessel, the replacement of concentrated liquid waste pumps, the employment of type B fuel. (Mori, K.)

  16. Boiler inspection manipulator for Torness Power Station

    International Nuclear Information System (INIS)

    Carrey, R.T.A.; Yule, I.Y.; Sibson, S.; Playle, M.J.

    1996-01-01

    The Advanced Gas-cooled Reactors at Torness and Heysham 2 are provided with dedicated access for remote inspection equipment. These in-service inspection (ISI) accesses comprise 12 penetrations above the core for inspection of the above core area and boilers, 12 below core penetrations for inspection of the lower boiler area and access through any of the 8 gas circulator penetrations for inspection of the sub-diagrid area. This paper describes a manipulator which will access the reactor from above the core via any of the 8 peripheral penetrations. (UK)

  17. Task analysis and structure scheme for center manager station in large container inspection system

    International Nuclear Information System (INIS)

    Li Zheng; Gao Wenhuan; Wang Jingjin; Kang Kejun; Chen Zhiqiang

    1997-01-01

    LCIS works as follows: the accelerator generates beam pulses which are formed into fan shape; the scanning system drags a lorry with a container passing through the beam in constant speed; the detector array detects the beam penetrating the lorry; the projection data acquisition system reads the projections and completes an inspection image of the lorry. All these works are controlled and synchronized by the center manage station. The author will describe the process of the projection data acquisition in scanning mode and the methods of real-time projection data processing. the task analysis and the structure scheme of center manager station is presented

  18. Results of the 4th regular inspection in Unit 1 of the Mihama Nuclear Power Station

    International Nuclear Information System (INIS)

    1981-01-01

    The 4th regular inspection of Unit 1 in the Mihama Nuclear Power Station was made from July, 1975, to December, 1980, on its reactor and associated facilities. The respective stages of inspection during the years are described. The inspection by external appearance examination, disassembling leakage inspection and performance tests indicated crackings in piping for fuel-replacement water tank, the container penetration of recirculation pipe for residual-heat removal, and main steam-relief valve, and leakage in one fuel assembly. Radiation exposure of the personnel during the inspection was less than the permissible dose. Radiation exposure data for the personnel are given in tables. The improvements and repairs done accordingly were as follows: reapir of the piping for a fuel-replacement tank and recirculation piping for residual-heat removal, replacement of the main steam-relief valve, plugging of heating tubes for the steam-generator, replacement of pins and covers for control-rod guide pipes, improvement of safety protection system and installation of rare gas monitor. (J.P.N.)

  19. Development of in-service inspection plans for nuclear components at the Surry 1 nuclear power station

    International Nuclear Information System (INIS)

    Vo, T.V.; Simonen, F.A.; Doctor, S.R.; Smith, B.W.; Gore, B.F.

    1993-01-01

    As part of the nondestructive evaluation reliability program sponsored by the US Nuclear Regulatory Commission at Pacific Northwest Laboratory, a methodology has been developed for establishing in-service inspection priorities of nuclear power plant components. The method uses results of probabilistic risk assessment in conjunction with the techniques of failure modes and effects analysis to identify and prioritize the most risk-important systems and components for inspection at nuclear power plants. Surry nuclear power station unit 1 was selected for demonstrating the methodology. The specific systems selected for analysis were the reactor pressure vessel, the reactor coolant, the low pressure injection including the accumulators, and the auxiliary feedwater. The results provide a risk-based ranking of components that can be used to establish a prioritization of the components and a basis for developing improved in-service inspection plans at nuclear power plants

  20. Results of special security inspection on improvement of security management setup in Head Office and Tsuruga Nuclear Power Station of the Japan Atomic Power Company and improvement of facilities in Tsuruga Nuclear Power Station

    International Nuclear Information System (INIS)

    1982-01-01

    In connection with the series of accidents in the Tsuruga Nuclear Power Station, the Agency of Natural Resources and Energy had instructed JAPC to make comprehensive inspection on the security management setup and to take improvement measures in the nuclear power station. The results of the subsequent inspection by ANRE confirmed that the improvements made by JAPC are adequate, and the following items are described: improvement of security management setup - communication and reporting in emergency, the management of inspection and maintenance records, work control and supervision in repair, improvement, etc., functional authority and responsibility in maintenance management, operation management, radiation control, personnel education; improvement of facilities - feed water heaters, laundry waste-water filter room, radioactive waste treatment facility, general drainage, concentrated waste liquid storage tanks in newly-built waste treatment building, etc. (J.P.N.)

  1. Results of the 6th regular inspection of No. 1 plant in Mihama Power Station, Kansai Electric Power Co., Inc

    International Nuclear Information System (INIS)

    Anon.

    1985-01-01

    The 6th periodical inspection on Unit 1 in the Mihama Power Station was made for the period of July to December 1984. Inspection was made in the following: reactor proper, reactor cooling system, instrumentation and control system, radiation control facility, etc. By external appearance observation, disassembly, performance test, etc. there were observed no abnormalities. Personnel radiation exposure doses during the inspection were below the permissible level. The following modification etc. works were done in the periodical inspection: replacement of the accumulator safety valve, replacement of the out-reactor nuclear instrumentation panel, installation of accident-time monitors, replacement of the control-rod cluster guide tube support pins, alteration in the fuel enrichment. (Mori, K.)

  2. Remote inspection system for nuclear power plants

    International Nuclear Information System (INIS)

    Inagaki, K.; Fujii, M.; Doi, A.; Harima, T.

    1977-01-01

    A remote inspection system for nuclear power plants was constructed based on an analysis of inspections performed by an operator on patrol. This system consists of an operator's console and a remote station. The remote station, equipped with five kinds of sensors, is steered along the inspection route by a photoelectric guiding system or may be manually controlled from an operator's console in a main control room. Signals for control and inspection data are multiplexed and transmitted through a coaxial cable

  3. Enhanced InService Inspection system for BWR plant

    International Nuclear Information System (INIS)

    Shouji, Hajime; Kobayashi, Teruo; Nagao, Tetsuya

    1993-01-01

    An enhanced InService Inspection system (ISI) has been developed, consisting of newly designed automated scanners, automated pipe inspection system and a high speed data acquisition/analysis station. This system uses a trackless magnetic crawler type nozzle inspection scanner attached to the nozzle shoulder by magnetic wheels. The automated pipe inspection system consists of an automated scanner, controller and high speed data acquisition station. These advanced automatic inspection systems are very useful for ISI, especially in reducing the radiation exposure and time required. (author)

  4. Results of 7th regular inspection of No.1 plant in Oi Power Station, Kansai Electric Power Co., Inc

    International Nuclear Information System (INIS)

    1989-01-01

    The 7th regular inspection of No.1 plant in Oi Power Station was carried out from December 25, 1987 to July 15, 1988. The parallel operation was resumed on June 23, 1988, 182 days after the start of the inspection. The facilities to be inspected were the reactor proper, reactor cooling system, measurement and control system, fuel facilities, radiation control facilities, waste facilities, reactor containment installation and emergency power generation system. On these facilities to be inspected, the appearance, disassembling, leak, function, performance and other inspections were carried out, and as the results, a part of the fitting of a water chamber partition cover for a steam generator broke off, significant signals were observed in 936 heating tubes of steam generators, 72 bolts for fixing the blade of a primary coolant pump were damaged, and leak was found in two fuel assemblies. The works related to this regular inspection were accomplished within the range of allowable radiation dose based on the relevant laws. The main reconstruction works carried out during the period of this regular inspection were the use of the fuel containing gadolinia, the removal of a thermometer bypass piping and the repair of defective steam generator tubes. (K.I.)

  5. Result of 11th regular inspection of No.1 plant in Shimane Nuclear Power Station, Chugoku Electric Power Co., Inc

    International Nuclear Information System (INIS)

    Anon.

    1987-01-01

    The 11th regular inspection of No.1 plant in Shimane Nuclear Power Station was carried out from January 9 to July 2, 1986. The parallel operation was resumed on June 19, 1986, 162 days after the parallel off. The facilities as the object of inspection were the reactor proper, reactor cooling system, measurement and control system, fuel facilities, radiation control facilities, waste facilities, reactor containment installation, and emergency power generation system. On these facilities as the object of inspection, the appearance, disassembling, leak, function, performance and other inspections were carried out, as the result, any abnormality was not found. The works related to this regular inspection were accomplished within the range of the allowable radiation dose based on the relevant laws. The main reconstruction works carried out during the period of this regular inspection were as follows. Feed water spargers were replaced with those of welded type, the material of the drain pipe for No.3 feed heater was changed to STPA 23, an exhaust compressor, an exhaust gas-water separator and others, which have not been used, were removed, and the connecting pipe for a liquid nitrogen evaporator was installed. (Kako, I.)

  6. Results of 8th regular inspection of No.2 plant in Hamaoka Nuclear Power Station, Chubu Electric Power Co., Inc

    International Nuclear Information System (INIS)

    1989-01-01

    The 8th regular inspection of No.2 plant in Hamaoka Nuclear Power Station was carried out from January 23 to June 28, 1988. The parallel operation was resumed on June 13, 1988, 143 days after the parallel off. The facilities to be inspected were the reactor proper, reactor cooling system, measurement and control system, fuel facilities, radiation control facilities, waste facilities, reactor containment installation and emergency power generation system. On these facilities to be inspected, the appearance, disassembling, leak, function, performance and other inspections were carried out, and as the result, abnormality was not found. However, during the preparation for running-in after starting up the reactor, the leak from a steam drain piping was found, therefore it was repaired. The works related to this regular inspection were accomplished within the range of allowable radiation dose based on the relevant laws. The maim reconstruction works carried out during the period of this regular inspection were the replacement of the components of cooling seawater pumps, the repair of a steam drain piping in the high pressure injection system and the replacement of LP turbine rotors. (K.I.)

  7. Boiler inspection manipulator for Torness Power Station

    International Nuclear Information System (INIS)

    Carrey, R.T.A.; Playle, M.J.

    1996-01-01

    In-service inspection at Torness Advanced Gas-cooled Reactor is achieved, via penetrations above and below the core area and boilers and through eight circulator penetrations for inspection of the sub-diagrid area. A manipulator is described which can access the area above the reactor core via any of these eight peripheral penetrations. The design and fabrication of the manipulator has led to innovation with a number of possible solutions being tendered. In reactor deployment of the successful design is expected in early 1997. (UK)

  8. Tire inspection system with shielded x-ray source

    International Nuclear Information System (INIS)

    Heisner, D.N.; Palermo, A. Jr.; Loyer, P.K.

    1976-01-01

    An automated tire inspection system is described which employs a penetrative radiation, such as x-radiation, to inspect the integrity of portions of tires fed sequentially along a feed path through a centering station and into a shielded enclosure where an inspection station is defined. Features of the system include a continuously operating x-ray source movable between inspection and retracted positions, and an x-ray shield for covering the source when it is retracted to permit the doors of the shielded enclosure to be opened without danger from escaping radiation. 19 Claims, 38 Drawing Figures

  9. The Ontario hydro low pressure turbine disc inspection program automated ultrasonic inspection systems - an overview

    International Nuclear Information System (INIS)

    Huggins, J.W.; Chopcian, M.; Grabish, M.

    1990-01-01

    An overview of the Ontario Hydro Low Pressure Turbine Disc Inspection Program is presented. The ultrasonic inspection systems developed in-house to inspect low pressure turbine discs at Pickering and Bruce Nuclear Generating stations are described. Three aspects of the program are covered: PART I - Background to inspection program, disc cracking experience, and development of an in-house inspection capability: PART II - System development requirements; ultrasonic equipment, electromechanical subsystems and instrumentation console: PART III - Customized software for flaw detection, sizing, data acquisition/storage, advanced signal processing, reports, documentation and software based diagnostics

  10. High Pressure Coolant Injection system risk-based inspection guide for Hatch Nuclear Power Station

    International Nuclear Information System (INIS)

    DiBiasio, A.M.

    1993-05-01

    A review of the operating experience for the High Pressure Coolant Injection (HPCI) system at the Hatch Nuclear Power Station, Units 1 and 2, is described in this report. The information for this review was obtained from Hatch Licensee Event Reports (LERs) that were generated between 1980 and 1992. These LERs have been categorized into 23 failure modes that have been prioritized based on probabilistic risk assessment considerations. In addition, the results of the Hatch operating experience review have been compared with the results of a similar, industry wide operating, experience review. This comparison provides an indication of areas in the Hatch HPCI system that should be given increased attention in the prioritization of inspection resources

  11. High Pressure Coolant Injection (HPCI) system risk-based inspection guide: Pilgrim Nuclear Power Station

    International Nuclear Information System (INIS)

    Shier, W.; Gunther, W.

    1992-10-01

    A review of the operating experience for the High Pressure Coolant Injection (HPCI) system at the Pilgrim Nuclear Power Station is described in this report. The information for this review was obtained from Pilgrim Licensee Event Reports (LERs) that were generated between 1980 and 1989. These LERs have been categorized into 23 failure modes that have been prioritized based on probabilistic risk assessment considerations. In addition, the results of the Pilgrim operating experience review have been compared with the results of of a similar, industry wide operating experience review. this comparison provides an indication of areas in the Pilgrim HPCI system that should be given increased attention in the prioritization of inspection resources

  12. 47 CFR 80.59 - Compulsory ship inspections.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Compulsory ship inspections. 80.59 Section 80... STATIONS IN THE MARITIME SERVICES Applications and Licenses § 80.59 Compulsory ship inspections. (a) Inspection of ships subject to the Communications Act or the Safety Convention. (1) The FCC will not normally...

  13. Application and study of advanced network technology in large container inspection system

    International Nuclear Information System (INIS)

    Li Zheng; Kang Kejun; Gao Wenhuan; Wang Jingjin

    1996-01-01

    Large Container Inspection System (LCIS) based on radiation imaging technology is a powerful tool for the customs to check the contents inside a large container without opening it. An image distributed network system is composed of center manager station, image acquisition station, environment control station, inspection processing station, check-in station, check-out station, database station by using advanced network technology. Mass data, such as container image data, container general information, manifest scanning data, commands and status, must be on-line transferred between different stations. Advanced network technology and software programming technique are presented

  14. Rail inspection system based on iGPS

    Science.gov (United States)

    Fu, Xiaoyan; Wang, Mulan; Wen, Xiuping

    2018-05-01

    Track parameters include gauge, super elevation, cross level and so on, which could be calculated through the three-dimensional coordinates of the track. The rail inspection system based on iGPS (indoor/infrared GPS) was composed of base station, receiver, rail inspection frame, wireless communication unit, display and control unit and data processing unit. With the continuous movement of the inspection frame, the system could accurately inspect the coordinates of rail; realize the intelligent detection and precision measurement. According to principle of angle intersection measurement, the inspection model was structured, and detection process was given.

  15. MRP-227 Reactor vessel internals inspection planning and initial results at the Oconee nuclear station unit 2

    International Nuclear Information System (INIS)

    Davidsaver, S.B.; Fyfitch, S.; Whitaker, D.E.; Doss, R.L.

    2015-01-01

    The U.S. PWR industry has pro-actively developed generic inspection requirements and standards for reactor vessel (RV) internals. The Electric Power Research Institute (EPRI) Pressurized Water Reactor (PWR) Materials Reliability Program (MRP) has issued MRP-227-A and MRP-228 with mandatory and needed requirements based on the Nuclear Energy Institute (NEI) document NEI 03-08. The inspection and evaluation guidelines contained in MRP-227-A consider eight age-related degradation mechanisms: stress corrosion cracking (SCC), irradiation-assisted stress corrosion cracking (IASCC), wear, fatigue, thermal aging embrittlement, irradiation embrittlement, void swelling and irradiation growth, and thermal and irradiation-enhanced stress relaxation or irradiation-enhanced creep. This paper will discuss the decision planning efforts required for implementing the MRP-227-A and MRP-228 requirements and the results of these initial inspections at the Oconee Nuclear power station (ONS) units. Duke Energy and AREVA overcame a significant technology and NDE challenge by successfully completing the first-of-a-kind MRP-227-A scope requirements at ONS-1 in one outage below the estimated dose and with zero safety issues or events. This performance was repeated at ONS-2 a year later. The remote NDE tooling and processes developed to examine the MRP-227-A scope for ONS-1 and ONS-2 are transferable to other PWRs

  16. Trouble found during regular inspection of No.1 plant in Takahama Power Station, Kansai Electric Power Co., Inc

    International Nuclear Information System (INIS)

    1990-01-01

    No.1 plant in Takahama Power Station, Kansai Electric Power Co., Inc. is a PWR plant with the rated output of 826 MWe. Its regular inspection has been carried out since August 10, 1989, and eddy current flaw detection inspection was performed on the total number of steam generator heating tubes (9619 tubes except already plugged tubes). As the result, significant indication was observed in 6 tubes in the U-bend part, in 6 tubes in the tube-supporting plate part, in 4 tubes in the crevice part in the tube plate, in 9 tubes in the expanded part in the tube plate and in 11 tubes at the boundary of the expanded part, in total in 36 heating tubes, all of them on high temperature side. Consequently, it was decided to plug these 36 defective heating tubes. The heating tubes are those made of Inconel 600, having 22.2 mm outside diameter and 1.27 mm wall thickness. (K.I.)

  17. Trouble found during regular inspection of No.3 plant in Mihama Power Station, Kansai Electric Power Co., Inc

    International Nuclear Information System (INIS)

    1990-01-01

    No.3 plant in Mihama Power Station, Kansai Electric Power Co., Inc. is a PWR type plant with the rated output of 826 MWe. Its regular inspection has been carried out since September 11, 1989, and eddy current flaw detection inspection was carried out on the total number of steam generator heating tubes (9997 tubes except already plugged tubes). As the result, significant indication was observed in 24 tubes in the expanded parts in tube plates, and in 36 tubes at the boundary of the expanded parts (all on high temperature side), in total in 60 tubes. Consequently, it was decided to plug these 60 defective heating tubes. The heating tubes are those made of Inconel 600, having 22.2 mm outside diameter and 1.27 mm wall thickness. The total number of heating tubes in 10164 (3388 tubes x 3 steam generators), the number of plugged tubes is 227, and the ratio of plugging is 2.2 %. (K.I.)

  18. Hydro-Quebec inspection robot RIT-LRG

    International Nuclear Information System (INIS)

    Champagne, D.; Rinfret, F.; Bourgault, Y.G.

    2008-01-01

    Hydro Quebec's Research Centre (IREQ), has developed a variety of inspection tools over the years. The Metar bracelet for the feeder tubes, the REC robot for the heat exchanger and the RIT robot for the Delayed Neutron system just to name a few. This paper discusses with the successful deployment of the Camera Probe Positioning robot for Visual Inspection of the sample lines of the delayed neutron system of CANDU power plants. This RIT robot has three possible configurations (Face, Cabinet and LRG configurations) and has remained a prototype version although it has been used over the years in many outage inspection campaigns since 1997. The main advantages of using this robot are: the significant reduction in radiation exposure, the high quality of the data collected and the archiving of inspection data for further analysis and reports. In 2007, Gentilly-2 (G-2), decided to industrialize the LRG configuration of the RIT robot and to designate it the standard tool for the inspection of the Delayed Neutron System. An improved RIT-LRG robot, along with its control box and command station was developed. The software had to be rewritten requiring an ergonomics analysis of user tasks, work station and interface display. These issues included both physical and cognitive requirements aspects. The two principal topics of this paper will be on the Inspection Robot Technology developed and highlights of the 2008 outage inspection campaign. (author)

  19. Hydro-Quebec inspection robot RIT-LRG

    Energy Technology Data Exchange (ETDEWEB)

    Champagne, D., E-mail: champagne.dominique@ireq.ca [Inst. de recherche d' Hydro-Quebec, Quebec (Canada); Rinfret, F.; Bourgault, Y.G., E-mail: rinfret.francois@hydro.qc.ca, E-mail: bourgault.yves.g@hydro.qc.ca [Hydro-Quebec, Becancour, Quebec (Canada)

    2008-07-01

    Hydro Quebec's Research Centre (IREQ), has developed a variety of inspection tools over the years. The Metar bracelet for the feeder tubes, the REC robot for the heat exchanger and the RIT robot for the Delayed Neutron system just to name a few. This paper discusses with the successful deployment of the Camera Probe Positioning robot for Visual Inspection of the sample lines of the delayed neutron system of CANDU power plants. This RIT robot has three possible configurations (Face, Cabinet and LRG configurations) and has remained a prototype version although it has been used over the years in many outage inspection campaigns since 1997. The main advantages of using this robot are: the significant reduction in radiation exposure, the high quality of the data collected and the archiving of inspection data for further analysis and reports. In 2007, Gentilly-2 (G-2), decided to industrialize the LRG configuration of the RIT robot and to designate it the standard tool for the inspection of the Delayed Neutron System. An improved RIT-LRG robot, along with its control box and command station was developed. The software had to be rewritten requiring an ergonomics analysis of user tasks, work station and interface display. These issues included both physical and cognitive requirements aspects. The two principal topics of this paper will be on the Inspection Robot Technology developed and highlights of the 2008 outage inspection campaign. (author)

  20. Remote controlled ultrasonic pre-service and in-service inspections of reactor pressure vessels

    International Nuclear Information System (INIS)

    Mueller, G.

    1990-01-01

    The first mechanised in-service inspection of the reactor pressure vessel on unit one of Eskom's Koeberg nuclear power station has been carried out. Since 1968 a whole range of manipulators to carry out remote controlled ultrasonic inspections of nuclear power station equipment has been developed. The inspection of a reactor pressure vessel using a central mast manipulator is described. 3 figs., 1 ill

  1. Cooperative Station History Forms

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Various forms, photographs and correspondence documenting the history of Cooperative station instrumentation, location changes, inspections, and...

  2. 47 CFR 73.1201 - Station identification.

    Science.gov (United States)

    2010-10-01

    ... public file. The notice must state that the station's public file is available for inspection and that consumers can view it at the station's main studio and on its Web site. At least one of the announcements...

  3. A pilot application of risk-based methods to establish in-service inspection priorities for nuclear components at Surry Unit 1 Nuclear Power Station

    International Nuclear Information System (INIS)

    Vo, T.; Gore, B.; Simonen, F.; Doctor, S.

    1994-08-01

    As part of the Nondestructive Evaluation Reliability Program sponsored by the US Nuclear Regulatory Commission, the Pacific Northwest Laboratory is developing a method that uses risk-based approaches to establish in-service inspection plans for nuclear power plant components. This method uses probabilistic risk assessment (PRA) results and Failure Modes and Effects Analysis (FEMA) techniques to identify and prioritize the most risk-important systems and components for inspection. The Surry Nuclear Power Station Unit 1 was selected for pilot applications of this method. The specific systems addressed in this report are the reactor pressure vessel, the reactor coolant, the low-pressure injection, and the auxiliary feedwater. The results provide a risk-based ranking of components within these systems and relate the target risk to target failure probability values for individual components. These results will be used to guide the development of improved inspection plans for nuclear power plants. To develop inspection plans, the acceptable level of risk from structural failure for important systems and components will be apportioned as a small fraction (i.e., 5%) of the total PRA-estimated risk for core damage. This process will determine target (acceptable) risk and target failure probability values for individual components. Inspection requirements will be set at levels to assure that acceptable failure probabilistics are maintained

  4. Troubles detected during regular inspection of No.1 plant in Oi Power Station, Kansai Electric Power Co., Inc

    International Nuclear Information System (INIS)

    1990-01-01

    No. 1 plant in Oi Power Station, Kansai Electric Power Co., Inc. is a PWR plant with rated output of 1175 MW, and its regular inspection is carried out since August 14, 1989. When eddy current flaw detection inspection was carried out on the total number (11426 except already plugged tubes) of the heating tubes of steam generators, significant indication was observed in tube supporting plate part of 279 tubes, at the boundary of tube plate expanded part of 34 tubes, and in the tube plate expanded part of 99 tubes, 411 heating tubes in total (all on high temperature side). Consequently, it was decided to repair 367 tubes using sleeves, and to plug other 44 tubes. Besides, among the heating tubes plugged in the past, it was decided to remove plugs from 161 tubes, and by repairing them with sleeves, to use them again. Total number of heating tubes 13552 (3388 tubes x 4 steam generators), Number of plugged tubes 2009 (decrease by 117 this time), Ratio of plugging 14.8%. (K.I.)

  5. Measurement station for interim inspections of Lightbridge metallic fuel rods at the Halden Boiling Water Reactor

    Science.gov (United States)

    Hartmann, C.; Totemeier, A.; Holcombe, S.; Liverud, J.; Limi, M.; Hansen, J. E.; Navestad, E. AB(; )

    2018-01-01

    Lightbridge Corporation has developed a new Uranium-Zirconium based metallic fuel. The fuel rods aremanufactured via a co-extrusion process, and are characterized by their multi-lobed (cruciform-shaped) cross section. The fuel rods are also helically-twisted in the axial direction. Two experimental fuel assemblies, each containing four Lightbridge fuel rods, are scheduled to be irradiated in the Halden Boiling Water Reactor (HBWR) starting in 2018. In addition to on-line monitoring of fuel rod elongation and critical assembly conditions (e.g. power, flow rates, coolant temperatures, etc.) during the irradiation, several key parameters of the fuel will be measured out-of-core during interim inspections. An inspection measurement station for use in the irradiated fuel handling compartment at the HBWR has therefore been developed for this purpose. The multi-lobed cladding cross section combined with the spiral shape of the Lightbridge metallic fuel rods requires a high-precision guiding system to ensure good position repeatability combined with low-friction guiding. The measurement station is equipped with a combination of instruments and equipment supplied from third-party vendors and instruments and equipment developed at Institute for Energy Technology (IFE). Two sets of floating linear voltage differential transformer (LVDT) pairs are used to measure swelling and diameter changes between the lobes and the valleys over the length of the fuel rods. Eddy current probes are used to measure the thickness of oxide layers in the valleys and on the lobe tips and also to detect possible surface cracks/pores. The measurement station also accommodates gamma scans. Additionally, an eddy-current probe has been developed at IFE specifically to detect potential gaps or discontinuities in the bonding layer between the metallic fuel and the Zirconium alloy cladding. Potential gaps in the bonding layer will be hidden behind a 0.5-1.0 mm thick cladding wall. It has therefore been

  6. IRSN-ANCCLI partnership. IRSN-ANCCLI seminar on decennial inspections of 900 MWe reactors - November 2010

    International Nuclear Information System (INIS)

    Rollinger, Francois; Delalonde, Jean-Claude; Hubert, F.; Paulmaz, X.; Tindillere, M.; Lheureux, Y.; Junker, R.; Sene, M.

    2010-11-01

    This seminar addressed the commitment of local information commissions (CLI) in the analysis and follow-up of the third decennial inspections of the French 900 MWe nuclear reactors. A first session addressed topics directly related to these inspections. Contributions proposed under the form of Power Point presentations by experts and representatives of the IRSN, EDF and CLIs addressed the following issues: safety re-examination of EDF 900 MWe reactors at the occasion of the third decennial inspection, activities of the IRSN related to skill management in nuclear power stations, implementation of the third decennial inspection of the unit 1 of the Fessenheim nuclear power station, the issue of follow-up by a local information commission after a decennial inspection. A second session addressed topics not related to decennial inspections and were proposed by Gravelines and Dampierre local information commissions: analysis of significant safety events, issues of skill management in nuclear power stations

  7. Apparatus for assembling and welding end plugs to nuclear fuel cladding tubes and inspecting the end plug welds on an automated basis

    International Nuclear Information System (INIS)

    Schoenig, F.C. Jr.; Walker, E.S.; Cueman, M.K.; Haughton, R.A.; Zuloaga, J.A. Jr.

    1989-01-01

    This patent describes an automated apparatus for welding a separate end plug to one open end of each of a succession of nuclear fuel cladding tubes and for inspecting each end plug weld. The apparatus comprising, in combination: a welding station; a cooldown station for cooling each end plug weld in an inert gas atmosphere; a serial number reader station for reading a serial number on each end plug; a first weld inspection station; a second weld inspection station for generating second weld inspection data; a computer system linked with the serial number reader and the first and second weld inspection stations; an input queue for holding a plurality of tubes; a tube transporter for periodically picking individual tubes from the input queque and conveying the tubes in a direction transverse to their tube axis in indexing steps to index positions respectively axially aligned with the welding, serial number reader, and first and second weld inspection stations; and a sorter positioned at an output end of the tube transporter

  8. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    Whittle, J.

    1982-11-01

    The non-destructive testing of components for the proposed Sizewell B nuclear power station is discussed. Issues considered include: non-destructive testing techniques available; inspection of ferritic steel components during fabrication; reliability of the ultrasonic inspection of ferritic structures; inspection of components of austenitic steel; in-service inspection of the reactor coolant system. (U.K.)

  9. The operator's requirement for in service inspection at Hinkley Point 'B' power station

    International Nuclear Information System (INIS)

    Outram, J.F.

    The subject is discussed under the following heads: the need for reactor internal inspection (safety; commercial interest); the methods available (man access inspection; remote viewing inspection); experience with man access; experience with remote viewing; reactor outage time -comparison of the two methods; contamination control; conclusions. (U.K.)

  10. Trouble found in regular inspection of No.1 plant in Ikata Power Station, Shikoku Electric Power Co., Inc

    International Nuclear Information System (INIS)

    1989-01-01

    Since May 2, 1989, the regular inspection of No.1 plant which is a PWR plant with the rated output of 566 MW in Ikata Power Station, Shikoku Electric Power Co., Inc. has been carried out, and eddy current flaw detection inspection was conducted on the total 6585 heating tubes of steam generators except already plugged tubes. As the result, significant indication was observed in 12 heating tubes at the expanded part of the high temperature side tube plates. As to the cause, similarly to those observed in the same plant in the past, it is considered that the residual stress caused by expanding at the time of the manufacture and the internal pressure stress during the operation were superposed, and stress corrosion cracking occurred. It was decided that these 12 defective tubes are plugged. State of plugging in steam generators. Number of total heating tubes: 6776=3388 tubes x 2 steam generators. Number of plugged tubes: 203 including the increase of 12 this time. Ratio of plugging: 3.0 %. Heating tubes: Inconel 600 tubes of φ22.7 mm x 1.27 mm thickness. (K.I.)

  11. Ultrasonic inspection experience of steam generator tubes at Ontario Hydro and the TRUSTIE inspection system

    International Nuclear Information System (INIS)

    Choi, E.I.; Jansen, D.

    1998-01-01

    Ontario Hydro have been using ultrasonic test (UT) technique to inspect steam generator (SG) tubes since 1993. The UT technique has higher sensitivity in detecting flaws in SG tubes and can characterize the flaws with higher accuracy. Although an outside contractor was used initially, Ontario Hydro has been using a self-developed system since 1995. The TRUSTIE system (Tiny Rotating UltraSonic Tube Inspection Equipment) was developed by Ontario Hydro Technologies specifically for 12.7 mm outside diameter (OD) tubes, and later expanded to larger tubes. To date TRUSTIE has been used in all of Ontario Hydro's nuclear generating stations inspecting for flaws such as pitting, denting, and cracks at top-of-tubesheet to the U-bend region. (author)

  12. Improvement of foundation for inspection

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-08-15

    Japan Nuclear Energy Safety Organization has been carrying out improvement of inspection system for nuclear plants in Japan since 2003FY. The new inspection system was introduced into nuclear power plants in{sub -}2008FY. In this project, improvement of comprehensive plant performance assessment and management tool for the new inspection system are developed. In 2012FY, a trend analysis method of the plant performance was developed with reference to the IAEA literature. And the trend analysis was tried based on the results of the comprehensive plant performance assessment of all domestic plants except Fukushima-Daiichi Nuclear Power Station. In addition, the teaching materials for QMS training guideline were made. And improvement of a quality management system evaluation support tool was performed. (author)

  13. Improvement of foundation for inspection

    International Nuclear Information System (INIS)

    2013-01-01

    Japan Nuclear Energy Safety Organization has been carrying out improvement of inspection system for nuclear plants in Japan since 2003FY. The new inspection system was introduced into nuclear power plants in - 2008FY. In this project, improvement of comprehensive plant performance assessment and management tool for the new inspection system are developed. In 2012FY, a trend analysis method of the plant performance was developed with reference to the IAEA literature. And the trend analysis was tried based on the results of the comprehensive plant performance assessment of all domestic plants except Fukushima-Daiichi Nuclear Power Station. In addition, the teaching materials for QMS training guideline were made. And improvement of a quality management system evaluation support tool was performed. (author)

  14. Plant inspection tours with mobile data logging system

    International Nuclear Information System (INIS)

    Roesser, U.

    2006-01-01

    The MDE Mobile Data Logging System has been introduced in a number of German power plants for efficient logging, evaluation, and quality-assured documentation of data recorded on plant inspection tours by means of pocket PCs instead of slips of paper. It will be installed in other nuclear power plants in the near future. The MDE system is composed of the pocket PCs for logging data during plant inspection tours, the associated docking stations installed in the respective areas of application, one PC or, if necessary, several PCs with the appropriate user software, and the associated network links. To install the software in the power plant, lists of rooms and measurement stations as well as other positions on an inspection course are transmitted to the MDE system. When the system has been commissioned, inspection tours are planned in accordance with past experience and optimized in the computer. User experience is taken into account in program updates. New functions improve user comfort and ease of evaluation. Additions to the MDE software, and applications in other areas, are tentatively planned and will be implemented as the need arises. (orig.)

  15. ACEC: remote inspection, remote intervention, autonomous vehicle

    International Nuclear Information System (INIS)

    Anon.

    1986-01-01

    Early in 1979, the accident at the TMI-2 nuclear power station focused attention on the lack of inspection and intervention means in containments where high radiation levels do not allow the entrance of humans. Recent years have seen a trend towards significant developments in the application of robotic technology to maintenance and inspection in nuclear facilities. This paper presents the general development concept and the technical specifications of a mobile robot [fr

  16. Holographic inspection of nuclear plant

    International Nuclear Information System (INIS)

    Gordon, A.L.; Armour, I.A.; Glanville, R.; Malcolm, G.J.; Wright, D.G.

    1988-01-01

    The high resolution, enormous depth of field and high tolerance to radiation of holography mean that it has great potential as an inspection tool in the nuclear industry. In addition, the ability of double-pulse holography to yield detailed information on vibration over the whole field of both large and small structures provides measurements that often cannot be obtained in any other way. This paper reviews the development of equipment for the holographic inspection of nuclear fuel elements; a portable holocamera for use inside reactors; and the application of holographic techniques for vibration measurements in a nuclear power station. (author)

  17. A portable solution to enable guided ultrasonic inspection

    International Nuclear Information System (INIS)

    Enenkel, Laurent; Buechler, Johannes; Poirier, Jerome; Jervis David

    2012-01-01

    This paper describes the development and application of an innovative ultrasonic (UT) inspection system, which is 100% guided and menu-driven to reduce human error and ensure both inspection accuracy and productivity in the reliable and accurate non-destructive testing (NDT) of shafts, tubes, pipes, and other components and structures. Set-up is menu-directed with the minimum of instrument-specific training, allowing the integral operating software to calculate all the ultrasonic parameters for each task according to the inspection procedure and create an easy-to-follow inspection plan, using either phased array or conventional UT. The operator then scans the work piece, with an encoded scanner, which ensures that the inspection plan is strictly followed. Inspection data is transmitted to a review station in the industry-accepted, non-proprietary DICONDE protocol, allowing advanced analysis tools, such as real time, volume corrected imaging, to allow easier and more reliable image interpretation. By using GEs Rhythm software platform, inspection data can be reviewed and shared, reports generated and inspection results archived for traceability, tracking or further analysis.

  18. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    Smedley, G.P.

    1982-11-01

    A description is given of the role of Lloyd's Register of Shipping as Independent Inspection Agency for the primary circuit of the PWR for the proposed Sizewell B power station. Topics discussed include: Lloyd's Register of Shipping and its functions; the Independent Inspection Agency and its functions; fabrication of the reactor pressure vessel; inspection on site at Sizewell. (U.K.)

  19. In-service inspection of nuclear power-plant pressure components

    International Nuclear Information System (INIS)

    Lautzenheiser, C.E.

    1976-01-01

    The early light-water-reactor systems for production of commercial power were designed and fabricated in accordance with the codes then being used for fossil-fired power-generating stations with some design changes for increased inspectability during fabrication. Over the past few years, major strides have been made in in-service inspection technology. Work has been under way to determine the reliability of nondestructive testing methods and to develop formal inspection programs throughout the world. The major problems associated with in-service inspection are the scarcity of qualified personnel, the variability in procedures and data recording between inspection agencies, and exposure of inspection personnel to radiation. Further work will be required to more completely mechanize piping inspections to reduce radiation exposure and to standardize inspection procedures, equipment, and certification of personnel. Worldwide attention to the requirements of the American Society of Mechanical Engineers' Boiler and Pressure Vessel Code, the size and integrity of inspection agencies, and efforts such as the development of personnel qualification and certification guides emphasize the importance of in-service inspection to nuclear safety

  20. Methodology for the inspection of items important to safety

    International Nuclear Information System (INIS)

    Ishack, G.

    1981-11-01

    A description is given of the inspection methods adopted by the Canadian Atomic Energy Control Board. From the outset of the industry in Canada, resident officers have been assigned to nuclear power stations. These inspectors have unlimited access to equipment, documents and personnel at the station. They work closely with Head Office specialists, provincial authorities, and private consultants

  1. Experience in safeguarding nuclear material at the Rheinsberg nuclear power station

    International Nuclear Information System (INIS)

    Winkler, R.

    1976-01-01

    The three years' experience that has been gained in application of the Safeguards Agreement shows that the carrying out of inspections at the nuclear power plant has virtually no effect on operating conditions. In future it will be possible to reduce this effect even further and still maintain the operational reliability of the station. Verification of the transfer of nuclear material and detection of possible violations have proved relatively simple. The labour requirement of each unit at the station for the performance of inspections is not more that thirty man-days. Constructive collaboration between power station staff and inspectors is of great importance in improving the safeguards procedures. (author)

  2. Pre and post garter spring repositioning ultrasonic inspection of pressure tubes

    International Nuclear Information System (INIS)

    Desimone, C.; Katchadjian, P.; Tacchia, Mauricio

    1997-01-01

    This paper present a description of the ultrasonic cracked hydride blister detections system used for pre and post inspection of pressure tubes during garter spring repositioning in CNE (Embalse Nuclear Power Station). Ultrasonic system setup configuration, transducers characteristics, blister detection head, calibration of parameters, operating procedure, records of ultrasonic inspections and evaluation. (author) [es

  3. Automated ultrasonic shop inspection of reactor pressure vessel forgings

    International Nuclear Information System (INIS)

    Farley, J.M.; Dikstra, B.J.; Hanstock, D.J.; Pople, C.H.

    1986-01-01

    Automated ultrasonic shop inspection utilizing a computer-controlled system is being applied to each of the forgings for the reactor pressure vessel of the proposed Sizewell B PWR power station. Procedures which utilize a combination of high sensitivity shear wave pulse echo, 0 degrees and 70 degrees angled longitudinal waves, tandem and through-thickness arrays have been developed to provide comprehensive coverage and an overall reliability of inspection comparable to the best achieved in UKAEA defect detection trials and in PISC II. This paper describes the ultrasonic techniques, the automated system (its design, commissioning and testing), validation and the progress of the inspections

  4. Darlington Station outage - a maintenance perspective

    International Nuclear Information System (INIS)

    Plourde, J.; Marczak, J.; Stone, M.; Myers, R.; Sutton, K.

    1997-01-01

    Ontario Hydro's Darlington Nuclear Generating Station (4x881MW(e)net) has carried out its first station outage since full commercial operation. The outage presented challenges to the organization in terms of outage planning, support, management, and safe execution within the constraints of schedule, budget and resources. This paper will focus on the success of the outage maintenance program, identifying the major work programs - a vacuum structure and containment outage, an emergency service water system outage, an emergency coolant injection system outage, intake channel inspections, low pressure service water inspections, and significant outage maintenance work on each of the four reactor units. Planning for the outage was initiated early in anticipation of this important milestone in the station's life. Detailed safety reviews - nuclear, radiation, and conventional - were conducted in support of the planned maintenance program. System lineup and work protection were provided by the Station Operator work group. Work protection permitry was initiated well in advance of the outage. Station maintenance staff resources were bolstered in support of the outage to ensure program execution could be maintained within the schedule. Training programs were in place to ensure that expectations were clear and that high standards would be maintained. Materials management issues in support of maintenance activities were given high priority to ensure no delays to the planned work. Station management review and monitoring in preparation for and during the outage ensured that staff priorities remained focused. Lessons learned from the outage execution are being formalized in maintenance procedures and outage management procedures, and shared with the nuclear community. (author)

  5. Care management at Ikata Power Station

    International Nuclear Information System (INIS)

    Sakai, Koji

    1982-01-01

    For operating nuclear power stations safely and economically, it is necessary to control nuclear fuel itself and reactor cores. Nuclear fuel must be controlled consistently in view of quantitative balance and operational method over the whole nuclear fuel cycle of uranium ore, fabrication, burning in reactors and reprocessing, based on the plan of using fuel in electric power companies. The control of the burning in reactors is called core management, and it is important because the users of fuel execute it. For dealing with such core management works, Shikoku Electric Power Co., Inc., has developed the computer code system for grasping the state of fuel exchange and the burning condition in reactors and used it since 1972. The outline of the core management in Ikata Power Station is reported in this paper centering around computing works. The core management works are divided into those at the time of regular inspection and those in operation. In the regular inspection, fuel inspection, fuel exchange and reactor physics test are performed. In operation, the burning condition of fuel is grasped. The technical computations corresponding to these works are explained, and the examples of computations are shown. (Kako, I.)

  6. A pilot application of risk-informed methods to establish inservice inspection priorities for nuclear components at Surry Unit 1 Nuclear Power Station. Revision 1

    International Nuclear Information System (INIS)

    Vo, T.V.; Phan, H.K.; Gore, B.F.; Simonen, F.A.; Doctor, S.R.

    1997-02-01

    As part of the Nondestructive Evaluation Reliability Program sponsored by the US Nuclear Regulatory Commission, the Pacific Northwest National Laboratory has developed risk-informed approaches for inservice inspection plans of nuclear power plants. This method uses probabilistic risk assessment (PRA) results to identify and prioritize the most risk-important components for inspection. The Surry Nuclear Power Station Unit 1 was selected for pilot application of this methodology. This report, which incorporates more recent plant-specific information and improved risk-informed methodology and tools, is Revision 1 of the earlier report (NUREG/CR-6181). The methodology discussed in the original report is no longer current and a preferred methodology is presented in this Revision. This report, NUREG/CR-6181, Rev. 1, therefore supersedes the earlier NUREG/CR-6181 published in August 1994. The specific systems addressed in this report are the auxiliary feedwater, the low-pressure injection, and the reactor coolant systems. The results provide a risk-informed ranking of components within these systems

  7. Full-scale testing of waste package inspection system

    International Nuclear Information System (INIS)

    Yagi, T.; Kuribayashi, H.; Moriya, Y.; Fujisawa, H.; Takebayashi, N.

    1989-01-01

    In land disposal of low-level radioactive waste (LLW) in Japan, it is legally required that the waste packages to be disposed of be inspected for conformance to applicable technical regulations prior to shipment from each existing power station. JGC has constructed a fully automatic waste package inspection system for the purpose of obtaining the required design data and proving the performance of the system. This system consists of three inspection units (for visual inspection, surface contamination/dose rate measurement and radioactivity/weight measurement), a labelling unit, a centralized control unit and a drum handling unit. The outstanding features of the system are as follows: The equipment and components are modularized and designed to be of the most compact size and the quality control functions are performed by an advanced centralized control system. The authors discuss how, as a result of the full-scale testing, it has been confirmed that this system satisfies all the performance requirements for the inspection of disposal packages

  8. Improvements in televisual and photographic inspections of AGRs

    International Nuclear Information System (INIS)

    Hayter, R.; Wadsworth, A.

    1988-01-01

    The visual inspection techniques and equipment used at AGR Power Stations have been improved and updated in the light of need and technological advance, new equipment being developed and introduced where necessary. Specifically this report covers the development and use of: a short TRIUMPH compatible photographic camera 600 mm long x 75 mm dia taking 50 shots on a 35 mm film; a 240 mm dia photographic pod taking high quality 70 mm format photographs of large in-reactor volumes; a photographic camera of cross section 37 x 17 mm for the inspection of helically wound AGR boilers and the subsequent development of this latter device into a state of the art TV inspection camera. (author)

  9. Design of an aid to visual inspection workstation

    Science.gov (United States)

    Tait, Robert; Harding, Kevin

    2016-05-01

    Visual Inspection is the most common means for inspecting manufactured parts for random defects such as pits, scratches, breaks, corrosion or general wear. The reason for the need for visual inspection is the very random nature of what might be a defect. Some defects may be very rare, being seen once or twice a year, but May still be critical to part performance. Because of this random and rare nature, even the most sophisticated image analysis programs have not been able to recognize all possible defects. Key to any future automation of inspection is obtaining good sample images of what might be a defect. However, most visual check take no images and consequently generate no digital data or historical record beyond a simple count. Any additional tool to captures such images must be able to do so without taking addition time. This paper outlines the design of a potential visual inspection station that would be compatible with current visual inspection methods, but afford the means for reliable digital imaging and in many cases augmented capabilities to assist the inspection. Considerations in this study included: resolution, depth of field, feature highlighting, and ease of digital capture, annotations and inspection augmentation for repeatable registration as well as operator assistance and training.

  10. Remote tooling for inspection and repair in Pickering NGS-A calandria vault

    International Nuclear Information System (INIS)

    Hadji-Mirzai, M.; Tokarz, A.; Vandenberg, J.P.

    1993-01-01

    In recent years it has been necessary to develop capabilities for the inspection and repair of carbon steel components located within calandria vaults at Ontario Hydro's Pickering Nuclear Generating Station 'A'. Concerns about corrosion of piping and some of the structural components have made necessary the development of remote manipulators to inspect and repair carbon steel components within the vaults to ensure continued reliable operation of the units. Remote manipulators for this program have been designed to perform a number of inspection and repair tasks, and several versions have been developed to specialise in detailed inspection techniques and precision tooling module manipulation. (author)

  11. Method and apparatus for inspecting tires

    International Nuclear Information System (INIS)

    Fox, R.L.T.

    1975-01-01

    A method and apparatus for inspecting tires by the use of x-rays is disclosed in which a tire is advanced to an inspection station, engaged along opposite bead rims and inflated to axially spread the bead rims and side walls. An x-ray source is advanced axially into the tire and the tire is eccentrically rotated relative to the x-ray source to enable radial positioning of the source relative to the tire near the tire bead rim diameter without requiring radial movement of the x-ray source. The x-ray source produces an x-ray beam which sweeps about the interior of the expanded tire from bead rim to bead rim while the tire is rotated about its centerline. An x-ray detection system detects x-rays which have penetrated the wall and produces inspection information concerning the tire construction. (Patent Office Record)

  12. A stereoscopic television system for reactor inspection

    International Nuclear Information System (INIS)

    Friend, D.B.; Jones, A.

    1980-03-01

    A stereoscopic television system suitable for reactor inspection has been developed. Right and left eye views, obtained from two conventional black and white cameras, are displayed by the anaglyph technique and observers wear appropriately coloured viewing spectacles. All camera functions, such as zoom, focus and toe-in are remotely controlled. A laboratory experiment is described which demonstrates the increase in spatial awareness afforded by the use of stereo television and illustrates its potential in the supervision of remote handling tasks. Typical depth resolutions of 3mm at 1m and 10mm at 2m have been achieved with the reactor instrument. Trials undertaken during routine inspection at Oldbury Power Station in June 1978 are described. They demonstrate that stereoscopic television can indeed improve the convenience of remote handling and that the added display realism is beneficial in visual inspection. (author)

  13. An overview of in-service inspection for nuclear power plants in Japan

    International Nuclear Information System (INIS)

    Takano, Eishiro

    1996-01-01

    In nuclear power stations, for maintaining the safety of machinery and equipment, it is stipulated to carry out periodic inspection. The contents of the periodic inspection and the inspections of important matters are explained. In-service inspection (ISI) is the nondestructive inspection for confirming the soundness of reactor pressure vessels, main pipings, valves and others. The stipulations on the scope and time of the periodic inspection and ISI, the course of introducing ISI into Japan, and the basic way of thinking on ISI are described. Pre-service inspection (PSI) is carried out for the purpose of collecting and recording the initial data for ISI. The range of the objects of nondestructive inspection and leak test and the range of the objects of leak test only are shown. As to nondestructive inspection, the parts to be inspected, the frequency of inspection and the methods of inspection, and the method of leak test are described. As the present state of inspection technology, the automatic ultrasonic flow detectors for reactor vessels, piping welded parts and reactor vessel stud bolts, and the eddy current flaw detector for steam generator tubes are explained. (K.I.)

  14. 78 FR 24666 - Updates to the List of Plant Inspection Stations

    Science.gov (United States)

    2013-04-26

    ... 319 Coffee, Cotton, Fruits, Imports, Logs, Nursery stock, Plant diseases and pests, Quarantine..., laboratory facilities for pest and disease identification, and in some cases, provide facilities for...) division who inspect articles to ensure they are free of plant pests and diseases and otherwise comply with...

  15. 7 CFR 29.75c - Display of tobacco at receiving stations.

    Science.gov (United States)

    2010-01-01

    ... receiving stations. Each lot of tobacco delivered for sale at receiving stations and transferred to a conveyor system for unloading shall maintain a distance between adjacent lots of not less than 18 inches during the inspection process. The platform area used for examination with a conveyor system shall be a...

  16. An Articulated Inspection Arm for fusion purposes

    Energy Technology Data Exchange (ETDEWEB)

    Villedieu, E., E-mail: eric.villedieu@cea.fr [CEA-IRFM, 13108 Saint Paul lez Durance (France); Bruno, V.; Pastor, P.; Gargiulo, L. [CEA-IRFM, 13108 Saint Paul lez Durance (France); Song, Y.T.; Cheng, Y.; Feng, H. [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei (China); Liu, C. [CEA-IRFM, 13108 Saint Paul lez Durance (France); Institute of Plasma Physics, Chinese Academy of Sciences, Hefei (China); Shi, S.S. [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei (China)

    2016-11-01

    Highlights: • Requirements for in vacuum tokamak inspection are presented. • Development of a prototype of the Articulated Inspection Arm is described. • The upgrade of the prototype to convert it into a fully operational device is detailed. • Future applications of inspection robots in the new fusion reactors is discussed. - Abstract: Fusion Tokamaks are complex machines which require special conditions for their operation, in particular, high vacuum inside the vessel and high temperature of the vessel walls. During plasma phases, the first wall components are highly stressed and a control is necessary in case of doubt about their condition. To be able to make safely such an inspection in a short period of time is a great advantage. The Articulated Inspection Arm (AIA) developed by the CEA provides the capability for fast inspections of the first wall overall surface keeping the vacuum and temperature conditions of the vessel. The robot prototype was validated in Tore Supra in 2008. In the frame of a joint laboratory, CEA/IRFM and ASIPP have decided to upgrade the existing AIA prototype to use it routinely in the EAST and WEST tokamaks. The robot has followed an important upgrade program in 2013 and 2014. The document presents the various upgrades made on the mechanics, the sensors, the electronics, the control station and the integration adaptation for the operation on EAST. From the AIA experience, thoughts for future inspection robots are given.

  17. An Articulated Inspection Arm for fusion purposes

    International Nuclear Information System (INIS)

    Villedieu, E.; Bruno, V.; Pastor, P.; Gargiulo, L.; Song, Y.T.; Cheng, Y.; Feng, H.; Liu, C.; Shi, S.S.

    2016-01-01

    Highlights: • Requirements for in vacuum tokamak inspection are presented. • Development of a prototype of the Articulated Inspection Arm is described. • The upgrade of the prototype to convert it into a fully operational device is detailed. • Future applications of inspection robots in the new fusion reactors is discussed. - Abstract: Fusion Tokamaks are complex machines which require special conditions for their operation, in particular, high vacuum inside the vessel and high temperature of the vessel walls. During plasma phases, the first wall components are highly stressed and a control is necessary in case of doubt about their condition. To be able to make safely such an inspection in a short period of time is a great advantage. The Articulated Inspection Arm (AIA) developed by the CEA provides the capability for fast inspections of the first wall overall surface keeping the vacuum and temperature conditions of the vessel. The robot prototype was validated in Tore Supra in 2008. In the frame of a joint laboratory, CEA/IRFM and ASIPP have decided to upgrade the existing AIA prototype to use it routinely in the EAST and WEST tokamaks. The robot has followed an important upgrade program in 2013 and 2014. The document presents the various upgrades made on the mechanics, the sensors, the electronics, the control station and the integration adaptation for the operation on EAST. From the AIA experience, thoughts for future inspection robots are given.

  18. Using a laser scanning camera for reactor inspection

    International Nuclear Information System (INIS)

    Armour, I.A.; Adrain, R.S.; Klewe, R.C.

    1984-01-01

    Inspection of nuclear reactors is normally carried out using TV or film cameras. There are, however, several areas where these cameras show considerable shortcomings. To overcome these difficulties, laser scanning cameras have been developed. This type of camera can be used for general visual inspection as well as the provision of high resolution video images with high ratio on and off-axis zoom capability. In this paper, we outline the construction and operation of a laser scanning camera and give examples of how it has been used in various power stations, and indicate future potential developments. (author)

  19. Eddy current technology for heat exchanger and steam generator tube inspection

    Energy Technology Data Exchange (ETDEWEB)

    Obrutsky, L.; Lepine, B.; Lu, J.; Cassidy, R.; Carter, J. [Atomic Energy of Canada Limited, Chalk River, Ontario (Canada)

    2004-07-01

    A variety of degradation modes can affect the integrity of both heat exchanger (HX) and balance of plant tubing, resulting in expensive repairs, tube plugging or replacement of tube bundles. One key component for ensuring tube integrity is inspection and monitoring for detection and characterization of the degradation. In-service inspection of HX and balance of plant tubing is usually carried out using eddy current (EC) bobbin coils, which are adequate for the detection of volumetric degradations. However, detection and quantification of additional modes of degradation such as pitting, intergranular attack (IGA), axial cracking and circumferential cracking require specialized probes. The need for timely, reliable detection and characterization of these modes of degradation is especially critical in Nuclear Generating Stations. Transmit-receive single-pass array probes, developed by AECL, offer high defect detectability in conjunction with fast and reliable inspection capabilities. They have strong directional properties, permitting probe optimization for circumferential or axial crack detection. Compared to impedance probes, they offer improved performance in the presence of variable lift-off. This EC technology can help resolve critical detection issues at susceptible areas, such as the rolled-joint transitions at the tubesheet, U-bends and tube-support intersections. This paper provides an overview of the operating principles and the capabilities of advanced ET inspection technology available for HX tube inspection. Examples of recent application of this technology in Nuclear Generating Stations (NGSs) are discussed. (author)

  20. Eddy current technology for heat exchanger and steam generator tube inspection

    International Nuclear Information System (INIS)

    Obrutsky, L.; Lepine, B.; Lu, J.; Cassidy, R.; Carter, J.

    2004-01-01

    A variety of degradation modes can affect the integrity of both heat exchanger (HX) and balance of plant tubing, resulting in expensive repairs, tube plugging or replacement of tube bundles. One key component for ensuring tube integrity is inspection and monitoring for detection and characterization of the degradation. In-service inspection of HX and balance of plant tubing is usually carried out using eddy current (EC) bobbin coils, which are adequate for the detection of volumetric degradations. However, detection and quantification of additional modes of degradation such as pitting, intergranular attack (IGA), axial cracking and circumferential cracking require specialized probes. The need for timely, reliable detection and characterization of these modes of degradation is especially critical in Nuclear Generating Stations. Transmit-receive single-pass array probes, developed by AECL, offer high defect detectability in conjunction with fast and reliable inspection capabilities. They have strong directional properties, permitting probe optimization for circumferential or axial crack detection. Compared to impedance probes, they offer improved performance in the presence of variable lift-off. This EC technology can help resolve critical detection issues at susceptible areas, such as the rolled-joint transitions at the tubesheet, U-bends and tube-support intersections. This paper provides an overview of the operating principles and the capabilities of advanced ET inspection technology available for HX tube inspection. Examples of recent application of this technology in Nuclear Generating Stations (NGSs) are discussed. (author)

  1. Experiences of operation for Ikata Nuclear Power Station

    International Nuclear Information System (INIS)

    Kashimoto, Shigeyuki

    1979-01-01

    No. 1 plant in the Ikata Nuclear Power Station, Shikoku Electric Power Co., Inc., is a two-loop PWR unit with electric output of 566 MW, and it began the commercial operation on September 30, 1977, as the first nuclear power station in Shikoku. It is the 13th LWR and 7th PWR in Japan. The period of construction was 52 months since it had been started in June, 1973. During the period, it became the object of the first administrative litigation to seek the cancellation of permission to install the reactor, and it was subjected to the influence of the violent economical variation due to the oil shock, but it was completed as scheduled. After the start of operation, it continued the satisfactory operation, and generated about 2.35 billion KWh for 4300 operation hours. It achieved the rate of utilization of 96.7%. Since March 28, 1978, the first periodical inspection was carried out, and abnormality was not found in the reactor, the steam generator and the fuel at all. The period of inspection was 79 days and shorter than expected. The commercial operation was started again on June 14. The outline of the Ikata Nuclear Power Station, its state of operation, and the periodical inspection are reported. Very good results were able to be reported on the operation for one year, thanks to the valuable experiences offered by other electric power companies. (Kako, I.)

  2. Effectiveness for public acceptance of nuclear energy. Analysis of questionnaire distributed at organized visits to Nuclear Power Stations

    International Nuclear Information System (INIS)

    1996-01-01

    In First Atomic Power Industry Group, as a part of the public acceptance activities for nuclear power, the visit to nuclear power stations for the inspection have been held. This aims at acquiring the correct knowledge on nuclear power by seeing the various facilities of nuclear power stations actually by own eyes. In the execution of the visits, mainly female employees were asked to participate, calling to the various companies in the group. On November 16 and 17, 1995, the visit to Kashiwazaki-Kariwa nuclear power station of Tokyo Electric Power Co. was held. In this study, the impression and opinion that all the participants possess through the visit and the seminar held beforehand were collected and analyzed by the questionnaire. The schedule of the visit, and the contents of the questionnaire are shown. As the feature of the questionnaire, the same questions were made before and after the inspection, and the change of opinion was examined. The results are summarized. The participants who trust the safety of nuclear power stations were 37% before the inspection and increased to 84% after the inspection. (K.I.)

  3. Apparatus for inspecting a group of containers and method of using same

    Science.gov (United States)

    Lee, Jr., James H.; Salton, Jonathan R [Albuquerque, NM; Spletzer, Barry L [Albuquerque, NM

    2012-02-28

    An apparatus and method for inspecting a plurality of containers are provided. Each container has an outer surface for housing at least one material therein. The techniques provided involve at least one inspection vehicle and at least one detector. Each inspection vehicle has a plurality of wheels for movably positioning about the plurality of containers. The wheels may have at least one magnet for selectively adhering to the outer surface of at least one of the containers whereby the inspection vehicle traverses the container(s). The detector is positionable proximate at least one of the containers. The detector may be deployable from the inspection vehicle to a position adjacent the container(s). The detector has at least one sensor for measuring at least one characteristic of the plurality of containers. At least one base station may be provided for communicating with the inspection vehicle(s) and/or detector(s).

  4. Use of mountaineering rope climbing techniques vs custom-built platforms for penstock inspections

    Energy Technology Data Exchange (ETDEWEB)

    Bechai, M.; Dmochowski, A.; Conlon, J.; Bhat, P.D. [Ontario Hydro, Toronto, ON (Canada); Henderson, D. [Remote Access Technology Inc., Dartmouth, NS (Canada)

    1998-12-01

    Ontario Hydro has developed an inspection and maintenance strategy that requires periodic inspections of their ageing penstocks. The utility has 149 operating penstocks distributed throughout the province. Ontario Hydro experienced problems ranging from minor deterioration to major failures requiring immediate and costly shut-down of entire stations. Three levels of the inspection and maintenance strategy are described. These are a routine external inspections, periodic internal and external inspections, and detailed inspection and assessment. Detailed inspection requires full access to all areas of the penstock, inside and outside, with detailed testing and analysis. Rope access techniques have been used successfully and cost effectively to gain access for close up observation and tactile contact allowing for evaluation and testing. Minor, quick repairs can also be carried out. It was noted that specially designed platforms will still be needed when extensive repairs and maintenance is required. 2 refs., 1 tab., 3 figs.

  5. Implementing an effective self-assessment program at Millstone Station

    International Nuclear Information System (INIS)

    Venable, J.M.

    1996-01-01

    The nuclear industry is becoming ever more reliant on self-assessments to ensure operational safety and to meet our increasingly competitive business challenges. This trend includes utility assessments modeled after major U.S. Nuclear Regulatory Commission (NRC) inspections such as safety system functional inspections (SSFI). Utility conducted SSFIs leveraged the limited resources of the NRC, making possible many evaluations that simply would not have been conducted otherwise. This report describes a self-assessment program at the Millstone Station plant

  6. Revised inspection program for nuclear power plants

    International Nuclear Information System (INIS)

    1978-01-01

    The United States Nuclear Regulatory Commission (NRC) regulates nuclear power plants to assure adequate protection of the public and the environment from the dangers associated with nuclear materials. NRC fulfills this responsibility through comprehensive safety reviews of nuclear facilities, licensing of organizations that use nuclear materials, and continuing inspection. The NRC inspection program is currently conducted from the five regional offices in or near Philadelphia, Atlanta, Chicago, Dallas and San Francisco. Inspectors travel from the regional offices to nuclear power plants in various phases of construction, test and operation in order to conduct inspections. However, in June 1977 the Commission approved a revision to the inspection program that will include stationing inspectors at selected plants under construction and at all plants in operation. In addition, the revised program provides for appraising the performance of licensees on a national basis and involves more direct measurement and observation by NRC inspectors of work and tests in progress. The program also includes enhanced career management consisting of improved training and career development for inspectors and other professionals. The report was requested in the Conference Report on the NRC Authorization for Appropriations for Fiscal Year 1978. The report provides a discussion of the basis for both the current and revised inspection programs, describes these programs, and shows how the NRC inspection force will be trained and utilized. In addition, the report includes a discussion of the actions that will be taken to assure the objectivity of inspectors

  7. Present status of maintenance in nuclear power stations

    International Nuclear Information System (INIS)

    Fueki, Kensuke

    1982-01-01

    For nuclear power stations, the improvement of the rate of facility utilization is indispensable. As its means, the shortening of regular inspection period, the adoption of long term cycle operation, the shortening of plant shutdown period by the improvement of the reliability of installed equipment and so on are conceivable. In this paper, the maintenance techniques in nuclear power stations which constitute the basis of reliability improvement are explained. In nuclear power stations, the use of nuclear fuel, accordingly the existence of radioactivity are the remarkable features. At the time of an accident, the nuclear reaction in a reactor must be stopped, and the excessive heat must be removed. The radioactivity in nuclear fuel must not be released outside. The regular inspection of once a year is provided by the law, and routine tests are performed during normal operation. The check-up by operators also is a part of the safety measures. For the early detection of abnormality, the diagnosis system is developed, and the maintenance techniques during operation are examined for being taken into the safety test and standard. The improvement of reliability is attempted by the redundancy of systems. The activity of quality assurance, the organization for the maintenance of nuclear power stations and maintenance works, and the measures to raise the rate of operation are reported. (Kako, I.)

  8. Routine radiation protection precautions in the turbine areas of nuclear power stations of the boiling water reactor type

    International Nuclear Information System (INIS)

    Meyer, U.; Slavitschek, G.

    1978-01-01

    The need for limiting access to turbine areas in BWR power stations is pointed out, and the advantages of closed circuit TV, aerosol measurements and lead glass windows are discussed. Reference is made to a 1000 MW station now under construction, a floor plan is shown and the need for making inspection/maintenance access as infrequent as possible is stated. Practical tests with CCTV are shown, and it is reported that attention was paid in the design of the station to achieving good visual contrast in areas which might have to be inspected for leaks. (G.M.E.)

  9. Nuclear fuel pellet inspection system

    International Nuclear Information System (INIS)

    Ahmed, H.J.; Beatty, J.M.; Kugler, R.W.

    1992-01-01

    At least one axially extending linear portion of the peripheral surface of the pellet is optically sensed, a set of digital values representative of the pellet surface is generated, and the set is compared to a predetermined standard. Groups of adjacent locations on the surface of the pellet having values greater or less than the predetermined standard are identified, and the pellet is rejected, when a flawed area exceeds a predetermined size. During inspection, the pellet is moved axially through an inspection station by parallel support rolls, spaced by a distance less than the pellet diameter. The rolls are rotated upward and outward from each other, rotating the pellet, and chain dogs are positioned between the spaced rolls for engaging a pellet and moving it along the rolls. The pellet is rejected if its peripheral surface area is too great, and a reference pellet may be used. (author)

  10. High Pressure Coolant Injection (HPCI) System Risk-Based Inspection Guide for Browns Ferry Nuclear Power Station

    International Nuclear Information System (INIS)

    Wong, S.; DiBiasio, A.; Gunther, W.

    1993-09-01

    The High Pressure Coolant Injection (HPCI) system has been examined from a risk perspective. A System Risk-Based Inspection Guide (S-RIG) has been developed as an aid to HPCI system inspections at the Browns Ferry Nuclear Power Plant, Units 1, 2 and 3. The role of. the HPCI system in mitigating accidents is discussed in this S-RIG, along with insights on identified risk-based failure modes which could prevent proper operation of the system. The S-RIG provides a review of industry-wide operating experience, including plant-specific illustrative examples to augment the PRA and operational considerations in identifying a catalogue of basic PRA failure modes for the HPCI system. It is designed to be used as a reference for routine inspections, self-initiated safety system functional inspections (SSFIs), and the evaluation of risk significance of component failures at the nuclear power plant

  11. High Pressure Coolant Injection (HPCI) System Risk-Based Inspection Guide for Browns Ferry Nuclear Power Station

    Energy Technology Data Exchange (ETDEWEB)

    Wong, S.; DiBiasio, A.; Gunther, W. [Brookhaven National Lab., Upton, NY (United States)

    1993-09-01

    The High Pressure Coolant Injection (HPCI) system has been examined from a risk perspective. A System Risk-Based Inspection Guide (S-RIG) has been developed as an aid to HPCI system inspections at the Browns Ferry Nuclear Power Plant, Units 1, 2 and 3. The role of. the HPCI system in mitigating accidents is discussed in this S-RIG, along with insights on identified risk-based failure modes which could prevent proper operation of the system. The S-RIG provides a review of industry-wide operating experience, including plant-specific illustrative examples to augment the PRA and operational considerations in identifying a catalogue of basic PRA failure modes for the HPCI system. It is designed to be used as a reference for routine inspections, self-initiated safety system functional inspections (SSFIs), and the evaluation of risk significance of component failures at the nuclear power plant.

  12. Safety evaluation for the inner canister closure station

    International Nuclear Information System (INIS)

    Glasscock, J.R.

    1987-01-01

    The Inner Canister Closure Station (ICCS), built by Remote Technology Corporation, will be operability tested. The ICCS is used to remotely leak test Inner Canister Closures (ICC's) and replace ICC's that are not water tight. After operability testing, the ICCS will be inspected and sent to the 717-F mock-up shop for remotability demonstration and dimensional checks, then installed in the Vitrification Building, 221-S. An analysis of potential safety hazards, equipment safety features, and procedural controls indicates that the ICCS can be operated without undue hazard to employees or to the public. A safety inspection and a new equipment inspection will be held before operation to verify that the ICCS meets Savannah River Site safety requirements. 4 refs., 6 figs

  13. Wireless Roadside Inspection Proof of Concept Test Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Capps, Gary J [ORNL; Franzese, Oscar [ORNL; Knee, Helmut E [ORNL; Plate, Randall S [ORNL; Lascurain, Mary Beth [ORNL

    2009-03-01

    The U.S. Department of Transportation (DOT) FMCSA commissioned the Wireless Roadside Inspection (WRI) Program to validate technologies and methodologies that can improve safety through inspections using wireless technologies that convey real-time identification of commercial vehicles, drivers, and carriers, as well as information about the condition of the vehicles and their drivers. It is hypothesized that these inspections will: -- Increase safety -- Decrease the number of unsafe commercial vehicles on the road; -- Increase efficiency -- Speed up the inspection process, enabling more inspections to occur, at least on par with the number of weight inspections; -- Improve effectiveness -- Reduce the probability of drivers bypassing CMV inspection stations and increase the likelihood that fleets will attempt to meet the safety regulations; and -- Benefit industry -- Reduce fleet costs, provide good return-on-investment, minimize wait times, and level the playing field. The WRI Program is defined in three phases which are: Phase 1: Proof of Concept Test (POC) Testing of commercially available off-the-shelf (COTS) or near-COTS technology to validate the wireless inspection concept. Phase 2: Pilot Test Safety technology maturation and back office system integration Phase 3: Field Operational Test Multi-vehicle testing over a multi-state instrumented corridor This report focuses on Phase 1 efforts that were initiated in March, 2006. Technical efforts dealt with the ability of a Universal Wireless Inspection System (UWIS) to collect driver, vehicle, and carrier information; format a Safety Data Message Set from this information; and wirelessly transmit a Safety Data Message Set to a roadside receiver unit or mobile enforcement vehicle.

  14. A study on activities of nuclear stations in the U.S. in the aim of enhancing safety culture

    International Nuclear Information System (INIS)

    Ichiki, Kuniyasu

    2011-01-01

    After the discovery of a Reactor Vessel Head Degradation at Davis Besse, the NRC, a regulatory body in the U.S., launched an evaluation scheme regarding nuclear stations' Safety Culture. In this evaluation, the NRC examines every inspection finding of conventional Reactor Oversight Program inspections to find out what was the most dominant causal factor with SC aspects. There are no similar analyses of this kind opened to public. This study has its goal of obtaining some useful clue for realizing how to project SC enhancement activities, by making analysis on every ROP inspection finding as well as collecting examples of good practices in improving organizational performance of stations in the U.S. As for the inspection results of ROP, there are no obvious change in the trend of number and types of ROP findings. On the other hand, because of the variety in average number of findings at stations, we could assume that actual condition of SC within a particular station quite differs from other stations. Looking at ROP reports minutely, you may realize that all U.S. stations have been making great effort to improve the efficiency of its Corrective Action Program which is regarded as the key ability to identify and fix undesirable incidents broke out at the station. It is a noteworthy aspect that CAP is not a simple program of quality assurance but also one of the items in power stations to be improved continuously. The concrete elements of this process are realizing current organizational condition by series of Performance Indicators, setting the next goals with the PIs, also evaluating the degree of the achievements with them, and modifying or re-defining new goal of the organization in accordance with new situation. This idea is introduced into broad range of organizational activities all over the U.S., which assure their improvement to be objective and effective. Simultaneously, such way of operation have its staff devoted in own responsibility, which eventually

  15. Audit of Wolf Creek Generating Station, Unit 1 technical specifications. Final technical evaluation report

    International Nuclear Information System (INIS)

    Stromberg, H.M.

    1985-07-01

    This document was prepared for the Nuclear Regulatory Commission (NRC) to assist them in determining whether the Wolf Creek Generating Station Unit 1 Technical Specifications (T/S), which govern plant systems configurations and operations, are in conformance with the assumptions of the Final Safety Analysis Report (FSAR) as amended, the requirements of the Safety Evaluation Report (SER) as supplemented, and the Comments and Responses to the Wolf Creek Technical Specification Draft Inspection Report. A comparative audit of the FSAR as amended, the SER as supplemented, and the Draft Inspection Report was performed with the Wolf Creek T/S. Several discrepancies were identified and subsequently resolved through discussions with the cognizant NRC reviewer, NRC staff reviewers and/or utility representatives. The Wolf Creek Generating Station Unit 1 T/S, to the extent reviewed, are in conformance with the FSAR, SER, and Draft Inspection Report

  16. UK regulatory aspects of prestressed concrete pressure vessels for gas-cooled reactor nuclear power stations

    International Nuclear Information System (INIS)

    Watson, P.S.

    1990-01-01

    Safety assessment principles for nuclear power plants and for nuclear chemical plants demand application of best proven techniques, recognised standards, adequacy margins, inspection and maintenance of all the components including prestressed concrete pressure vessels. In service inspection of prestressed concrete pressure vessels includes: concrete surface examination; anchorage inspection; tendon load check; tendon material examination; foundation settlement and tilt; log-term deformation; vessel temperature excursions; coolant loss; top cap deflection. Hartlepool and Heysham 1 power plants prestress shortfall problem is discussed. Main recommendations can be summarised as follows: at all pressure vessel stations prestress systems should be calibrated in a manner which results in all load bearing components being loaded in a representative manner; at all pressure vessel stations load measurements during calibration should be verified by a redundant and diverse system

  17. Inspection maintenance and planning of shutdown in thermal electric generating plants

    International Nuclear Information System (INIS)

    Dezordi, W.L.; Correa, D.A.; Kina, M.

    1984-01-01

    The schedule shutdown of an industrial plant and, more specifically, of an electrical generating station, is becoming increasingly important. The major parameters to be taken into account for the planning of such a shutdown are basically of economic-financial nature such as costs of the related services (materials, equipment, manpower, etc), loss of revenue caused by the station's shutdown as well as by the station availability, and other requirements expected from it by the Load Dispatch and consumers. Improving the equipment's performances and the station's availability are the fundamental objectives to be strived for. The authors present in this paper, in an abridged form, the planning tools used for thermal electric generating plants shutdowns for inspections, maintenance and design changes implementation. (Author) [pt

  18. Steam generator maintenance and life management at Embalse Nuclear Station

    International Nuclear Information System (INIS)

    Sainz, R.; Diaz, G.; Sveruga, H.; Ramakrishnan, T.K.; Azeez, S.

    2004-01-01

    The Embalse Nuclear Station has four steam generators (SGs) with inverted vertical U tubes manufactured by Babcock and Wilcox Canada (B and W). These are main components, both from the operative point of view as the heat transfer from the Primary Heat Transport System (PHTS) to the Secondary System, and from the point of view of safety, as they are the part of the PHTS and its radioactive inventory pressure barrier. In addition, they are one of the most important cost-related elements for potential life extensions. Maintenance and inspections are carried out in order to maintain a high availability of the SGs, as they have had a positive impact on the operational availability of the plant, and to reduce the tube failure probabilities, thus minimizing the amount of radioactive effluents and taking care of the condition of the main components in order to enable the plant life management and the planning of the plant life extension. The most relevant maintenance activities performed have been the inspections performed on 100% of the tubes every 3 years. the mechanical cleaning of the inside of the tubes, the sludge removal from the secondary side tubesheet, the divider plate replacement, and the inspection of internals of the secondary side.Thanks to the latter and to the eddy current inspections, the degradation in the U-bend supports was detected early and every effort is being made to repair them shortly. Besides, a life management program has been started covering the entire plant starting with this important component. The Embalse Nuclear Station's SGs show a low percentage of plugged tubes compared to other stations in similar conditions, but they must be monitored continually and systematically if a life extension is intended. (author)

  19. Efforts toward enhancing seismic safety at Kashiwazaki Kariwa Nuclear Power Station

    International Nuclear Information System (INIS)

    Yamashita, Kazuhiko

    2009-01-01

    It has been two years since the Niigata-ken Chuetsu-oki Earthquake (NCOE) occurred in 2007. The earthquake brought a major disaster for Kashiwazaki, Kariwa, and the neighboring areas. First of all, we would like to give condolences to people in the devastated area and to pray for the immediate recovery. Our Kashiwazaki Kariwa Nuclear Power Station located in the same area was naturally caught up in the earthquake. The station was hit by a big tremor more than its intensity assumed to be valid at the station design stage. In spite of unexpected tremor, preventive functions for the station safety worked as expected as it designed. Critical facilities designed as high seismic class were not damaged, though considerable damages were seen in outside-facilities designed as low seismic class. We currently make efforts to inspect and recover damages. While we carefully carry out inspection and assessment to make sure the station integrity, we are also going forward restoration as well as construction for seismic safety enhancement in turn. This report introduces details of the following accounts, these are an outline of guidelines for seismic design evaluation that was revised in 2006, a situation at Kashiwazaki Kariwa Nuclear Power Station in the aftermath of the earthquake, and efforts toward enhancing seismic safety that the Tokyo Electric Power Company (TEPCO) has made since the seismic disaster, and our approach to evaluation of facility integrity. (author)

  20. Overview of steam generator tube-inspection technology

    International Nuclear Information System (INIS)

    Obrutsky, L.; Renaud, J.; Lakhan, R.

    2014-01-01

    Degradation of steam generator (SG) tubing due to both mechanical and corrosion modes has resulted in extensive repairs and replacement of SGs around the world. The variety of degradation modes challenges the integrity of SG tubing and, therefore, the stations' reliability. Inspection and monitoring aimed at timely detection and characterization of the degradation is a key element for ensuring tube integrity. Up to the early-70's, the in-service inspection of SG tubing was carried out using single-frequency eddy current testing (ET) bobbin coils, which were adequate for the detection of volumetric degradation. By the mid-80's, additional modes of degradation such as pitting, intergranular attack, and axial and circumferential inside or outside diameter stress corrosion cracking had to be addressed. The need for timely, fast detection and characterization of these diverse modes of degradation motivated the development in the 90's of inspection systems based on advanced probe technology coupled with versatile instruments operated by fast computers and remote communication systems. SG inspection systems have progressed in the new millennium to a much higher level of automation, efficiency and reliability. Also, the role of Non Destructive Evaluation (NDE) has evolved from simple detection tools to diagnostic tools that provide input into integrity assessment decisions, fitness-far-service and operational assessments. This new role was motivated by tighter regulatory requirements to assure the safety of the public and the environment, better SG life management strategies and often self-imposed regulations. It led to the development of advanced probe technologies, more reliable and versatile instruments and robotics, better training and qualification of personnel and better data management and analysis systems. This paper provides a brief historical perspective regarding the evolution of SG inspections and analyzes the motivations behind that evolution. It presents an

  1. Development of heavy load carrying vehicle for nuclear power station

    International Nuclear Information System (INIS)

    Terabayashi, Yasuharu; Oono, Hiroo; Aizu, Takao; Kawaguchi, Kaname; Yamanaka, Masayuki; Hirobe, Tamio; Inagaki, Yoshiaki.

    1985-01-01

    In nuclear power stations, in order to carry out sound and stable operation, the routine inspection and regular inspection of machinery and equipment are performed, therefore, the transportation of heavy things is frequently carried out. Especially, the transportation of heavy things over the steps of passages and stairs requires much labor. Therefore, Chubu Electric Power Co., Inc. and Chubu Plant Service Co., Ltd. carried out the research on the development of a vehicle for transporting heavy components of nuclear power plants. In this research, it was aimed at developing a vehicle which can carry heavy components and get over a step, climb and descend stairs, and run through a narrow passage having many curves as well as running on flat ground. For this purpose, the actual state of the transportation of heavy things was investigated during the regular inspection of a nuclear power station, and on the basis of this results, a prototype vehicle was made and tested. Thereafter, a transporting vehicle of actual scale was made and tested. The investigation of actual state and the examination of the fundamental concept, the design, trial manufacture and verifying test are reported. (Kako, I.)

  2. Smart Infrared Inspection System Field Operational Test Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Siekmann, Adam [ORNL; Capps, Gary J [ORNL; Franzese, Oscar [ORNL; Lascurain, Mary Beth [ORNL

    2011-06-01

    The Smart InfraRed Inspection System (SIRIS) is a tool designed to assist inspectors in determining which vehicles passing through the SIRIS system are in need of further inspection by measuring the thermal data from the wheel components. As a vehicle enters the system, infrared cameras on the road measure temperatures of the brakes, tires, and wheel bearings on both wheel ends of commercial motor vehicles (CMVs) in motion. This thermal data is then presented to enforcement personal inside of the inspection station on a user friendly interface. Vehicles that are suspected to have a violation are automatically alerted to the enforcement staff. The main goal of the SIRIS field operational test (FOT) was to collect data to evaluate the performance of the prototype system and determine the viability of such a system being used for commercial motor vehicle enforcement. From March 2010 to September 2010, ORNL facilitated the SIRIS FOT at the Greene County Inspection Station (IS) in Greeneville, Tennessee. During the course of the FOT, 413 CMVs were given a North American Standard (NAS) Level-1 inspection. Of those 413 CMVs, 384 were subjected to a SIRIS screening. A total of 36 (9.38%) of the vehicles were flagged by SIRIS as having one or more thermal issues; with brakes issues making up 33 (91.67%) of those. Of the 36 vehicles flagged as having thermal issues, 31 (86.11%) were found to have a violation and 30 (83.33%) of those vehicles were placed out-of-service (OOS). Overall the enforcement personnel who have used SIRIS for screening purposes have had positive feedback on the potential of SIRIS. With improvements in detection algorithms and stability, the system will be beneficial to the CMV enforcement community and increase overall trooper productivity by accurately identifying a higher percentage of CMVs to be placed OOS with minimal error. No future evaluation of SIRIS has been deemed necessary and specifications for a production system will soon be drafted.

  3. ASME section XI: rules for inservice inspection of nuclear power plants -an introspection

    Energy Technology Data Exchange (ETDEWEB)

    John, P K; Anto, Y; Mungikar, C P; Wagh, P M [Nuclear Power Corporation of India Ltd., Tarapur (India). Tarapur Atomic Power Station

    1994-12-31

    Section XI of the ASME BPV code is addressed to the examination, test and inspection requirements of the components of nuclear power plants (NPPs). Since its inception in 1970, this code section has undergone vast changes -probably the most among other ASME BPV code sections. Section XI is full fledged and lays down requirements with regard to all preservice inspections, inservice inspection, repair and replacement of components, tests of system etc. Tarapur Atomic Power Station (TAPS) has the distinction of being one of the earliest BWR type NPPs in the world that has an inservice inspection programme organised in line with the ASME section XI requirements. This paper summarises the experiences gained from time to time using this code section and a few suggestions to prospective users. An effort is also made to explain the philosophy of inservice inspection from ASME section XI point of view. 3 refs.

  4. ASME section XI: rules for inservice inspection of nuclear power plants -an introspection

    International Nuclear Information System (INIS)

    John, P.K.; Anto, Y.; Mungikar, C.P.; Wagh, P.M.

    1994-01-01

    Section XI of the ASME BPV code is addressed to the examination, test and inspection requirements of the components of nuclear power plants (NPPs). Since its inception in 1970, this code section has undergone vast changes -probably the most among other ASME BPV code sections. Section XI is full fledged and lays down requirements with regard to all preservice inspections, inservice inspection, repair and replacement of components, tests of system etc. Tarapur Atomic Power Station (TAPS) has the distinction of being one of the earliest BWR type NPPs in the world that has an inservice inspection programme organised in line with the ASME section XI requirements. This paper summarises the experiences gained from time to time using this code section and a few suggestions to prospective users. An effort is also made to explain the philosophy of inservice inspection from ASME section XI point of view. 3 refs

  5. Virginia power nuclear power station engineer training program

    International Nuclear Information System (INIS)

    Williams, T.M.; Haberstroh-Timpano, S.

    1987-01-01

    In response to the Institute of Nuclear Power Operations (INPO) accreditation requirements for technical staff and manager, Virginia Power developed the Nuclear Power Station Engineer Training Programs (NPSETP). The NPSETP is directed toward enhancing the specific knowledge and skills of company engineers, especially newly hired engineers. The specific goals of the program are to promote safe and reliable plant operation by providing engineers and appropriate engineering technicians with (1) station-specific basic skills; (2) station-specific specialized skills in the areas of surveillance and test, plant engineering, nuclear safety, and in-service inspection. The training is designed to develop, maintain, and document through demonstration the required knowledge and skills of the engineers in the identified groups at North Anna and Surry Power Stations. The program responds to American National Standards Institute, INPO, and US Nuclear Regulatory Commission standards

  6. A review of digital radiography technology for valve inspection

    International Nuclear Information System (INIS)

    Stoev, K.; Guerout, F.M.; Horn, D.

    2008-01-01

    There are thousands of valves in a nuclear power plant (NPP) used for control, safety and checks in various plant systems, so there is a well-identified need for fast and reliable inspection and diagnostics of valves. Digital radiography can provide considerable improvements to the inspection and testing procedures for valves in comparison to classical film radiography. These improvements can lead to significant financial advantages by providing real-time inspection results, significantly reduced inspection and decision-making time, and reduced operational cost. Digital image processing, including digital image enhancement, digital archiving, and digital communication of the images and the results, is also a considerable advantage over classical film radiography technology. Another advantage of digital radiography technology is the improved safety and the reduced environmental impact due to reduced exposure/test times, use of smaller exclusion zones, elimination of chemical processing, and absence of disposable materials. This paper reviews the existing technology and evaluates the potential of digital radiography for inspection and diagnostics of valves. Station needs and requirements are assessed, and the safety, environmental and economical constraints of digital radiography techniques estimated. The advantages and disadvantages of different digital radiography equipment are compared, and their limitations and characteristics studied. (author)

  7. Russian RSC Energia employees inspect DM in SSPF

    Science.gov (United States)

    1995-01-01

    Employees of the Russian aerospace company RSC Energia prepare to conduct final inspections of the Russian-built Docking Module in the Space Station Processing Facility at KSC. The module will fly as a primary payload on the second Space Shuttle/Mir space station docking mission, STS-74, which is now scheduled for liftoff in the fall of 1995. During the mission, the module will first be attached with the orbiter's robot arm to the Orbiter Docking System (ODS) in the payload bay of the orbiter Atlantis and then be docked with the Mir. When Atlantis undocks from the Mir, it will leave the new docking module permanently attached to the space station for use during future Shuttle Mir docking missions. The new module will simplify future Shuttle linkups with Mir by improving orbiter clearances when it serves as a bridge between the two space vehicles.

  8. Inspection system of radioactive contamination in foods and its results in Yokohama City

    International Nuclear Information System (INIS)

    Morita, Masahiro

    1993-01-01

    Accompanying the Chernobyl nuclear power plant accident occurred on April 26, 1986, the radioactive contamination of the foods imported from Europe became problems. Consequently, the Ministry of Health and Welfare stipulated the temporary limit of radioactive concentration in imported foods in terms of the total of Cs-134 and Cs-137 at less than 370 becquerel per 1 kg of foods in November, 1986, and the inspection system was tightened. In Yokohama, in view of securing the safety of foods and eliminating the anxiety of citizen, the measuring instruments for radioactivity were installed in the Hygiene Laboratory in 1986 and in the Food Hygiene Inspection Stations in Central Wholesale Market in 1987, and the inspection was begun. So far 720 subjects were inspected, but there was none that exceeds the temporary limit. The period and the method of executing the inspection and the results of nuclide analysis, screening inspection and so on are reported. It was judged that at the present point of time, there is not much influence to the life of citizen. (K.I.)

  9. On the development of the METAR family of inspection tools

    Energy Technology Data Exchange (ETDEWEB)

    Lavoie, E. [Inst. de recherche d' Hydro-Quebec, Varennes, Quebec (Canada)]. E-mail: lavoie.eric@ireq.ca; Rousseau, G. [Hydro-Quebec, Central Nucleaire Gentilly-2, Gentilly, Quebec (Canada); Reynaud, L. [Inst. de recherche d' Hydro-Quebec, Varennes, Quebec (Canada)

    2003-07-01

    Since 1998, Hydro Quebec Research Centre (IREQ), in collaboration with Gentilly-2, has been working on the development of inspection devices for the feeder tubes of CANDU power plants. The first tool to come out of this work was the Metar bracelet, now used throughout the CANDU utilities, consisting of 14 ultrasonic probes held in place in a rigid bracelet to measure the thickness of the pipes and moved around manually along the pipe. Following the success of the Metar, a motorized version, i.e. the Crawler, has been developed to inspect beyond the operator arm's reach to access hard to reach place or further down the pipes in the reactor. This new system has been tested at 3 different stations and will be commercially available soon. Finally, the same technology was used to develop a motorized 2-axis crack detection device to answer new concerns about the feeder. Other configurations, depending on the demands from the industry, could also be developed for specific inspection needs, for example; inspection of the graylock welds, 360{sup o} inspection of feeders, or multitasking inspection on a single frame, etc. Most of the designs shown in this article have been or will be patented and are, or will be, licensed to a partner company to make them commercially available to the industry. This paper gives a brief history of the project and a description of the technologies developed in the last 5 years concerning feeder inspection. (author)

  10. The structural integrity safety case for Sizewell B power station

    International Nuclear Information System (INIS)

    Gerachty, J.E.

    1993-01-01

    This paper presents the safety case approach adopted for the components of the Sizewell 'B' Power Station for which a high degree of structural integrity is required. Such components include the Reactor Pressure Vessel, Steam Generator and Pressuriser for which Incredibility of Failure is claimed. The two parts of the case involve achievement and demonstration of integrity. This is achieved by extensive measures involving design, manufacture, materials and inspection. The demonstration has required a fracture mechanics approach. The specific role of inspection validation and its relation to critical defect size is described. (author)

  11. MACS as a tool for international inspections

    International Nuclear Information System (INIS)

    Curtiss, J.A.; Indusi, J.P.

    1995-01-01

    General acceptance of the challenge provision in the Chemical Weapons Convention has the potential for influence in other arms control areas. While most applications of the challenge inspection may be straightforward, there may be instances where access to the site by inspectors may be problematic. The MACS system described in this paper was developed to respond to these situations. Inspection and verification may be difficult when a host is unwilling,for valid reasons, to permit physical access to a site. We proposed a system of remote sensors which may be used to demonstrate compliance with Chemical Weapons Convention (CWC) challenge inspections even ff the inspector is physically excluded from a sensitive site. The system is based upon alternative-means-of-access provisions of the CWC. The Defense Nuclear Agency (DNA) funded design and construction of a system prototype, designated as MACS for Managed Access by Controlled Sensing. Features of the MACS design allow growth of the prototype into a versatile device for international monitoring of production facilities and other sites. MACS consists of instrumentation and communication equipment allowing site personnel to conduct a facility tour and perform acceptable measurements, while physically excluding the inspector from the facility. MACS consists of a base station used by the inspector, and a mobile unit used within the facility and manipulated by the facility staff. The base station and the mobile unit are at sign ed by a communication system, currently realized as a fiber optic cable. The mobile unit is equipped with television cameras and remote-reading distance-measuring equipment (DME) for use in verifying locations and dimensions. Global Positioning System receivers on the mobile unit provide both precise location and dead reckoning, suitable for tracking the mobile unit's position while within a building when satellite signals are not available

  12. Moderator inlet line hanger replacement for Pickering nuclear power station

    International Nuclear Information System (INIS)

    Kirkpatrick, R.A.; Bowman, J.M.; Symmons, W.R.; El-Nesr, S.

    1988-01-01

    Ontario Hydro's Pickering Nuclear Generating Station (PNGS), Units 1 and 2 were shutdown for large scale fuel channel replacement. Other nonroutine inspection and maintenance activities were performed to determine the overall condition of the units and it was seen that a moderator inlet line hanger (identified as HR-29) had failed in both units. Subsequent inspections during planned maintenance outages of Pickering NGS Units 3 and 4 revealed that hanger HR-29 had failed and required replacement. A research program was conducted to find a suitable technique. These problems included accessing tooling through small inspection ports, manipulating tooling from a significant distance and the high radiation fields within the vault. This paper describes the program undertaken to replace hanger HR-29. (author)

  13. Experience in testing and inspection and maintenance of material handling equipments

    International Nuclear Information System (INIS)

    Sharma, M.L.

    2009-01-01

    All the Industries, Power Projects/Stations, Organizations engaged in the field of process of manufacturing, power generation, transportation, design, layout, manufacturing, and supply have to utilize material handling equipment, machinery tools tackles, lifting gears for performing their tasks/activities. The major role of the material handling equipments play an important role and a component of 40% of the total activities of the system/process to achieve targeted output with the reliability and quality is performed by material handling equipment and machineries. The material handling equipment shall have to be chosen/selected to suit the process requirement at times to be specifically designed inspected and tested to meet the specific requirement. These equipment/machineries/lifting gears have to undergo for the periodical inspection and testing to qualify for further use in a specified period. All those equipment and machinery to be used for material handling if not found satisfactory during inspection and testing or otherwise also shall be dismantled/stripped to the extent of inspection requirement of the components/sub components and maintenance repair shall have to be done to make them worthy for reuse after testing and inspection duly witnessed by competent authority

  14. Overview of steam generator tube-inspection technology

    Energy Technology Data Exchange (ETDEWEB)

    Obrutsky, L.; Renaud, J.; Lakhan, R., E-mail: obrutskl@aecl.ca, E-mail: renaudj@aecl.ca, E-mail: lakhanr@aecl.ca [Atomic Energy of Canada Limited, Chalk River, Ontario (Canada)

    2014-03-15

    Degradation of steam generator (SG) tubing due to both mechanical and corrosion modes has resulted in extensive repairs and replacement of SGs around the world. The variety of degradation modes challenges the integrity of SG tubing and, therefore, the stations' reliability. Inspection and monitoring aimed at timely detection and characterization of the degradation is a key element for ensuring tube integrity. Up to the early-70's, the in-service inspection of SG tubing was carried out using single-frequency eddy current testing (ET) bobbin coils, which were adequate for the detection of volumetric degradation. By the mid-80's, additional modes of degradation such as pitting, intergranular attack, and axial and circumferential inside or outside diameter stress corrosion cracking had to be addressed. The need for timely, fast detection and characterization of these diverse modes of degradation motivated the development in the 90's of inspection systems based on advanced probe technology coupled with versatile instruments operated by fast computers and remote communication systems. SG inspection systems have progressed in the new millennium to a much higher level of automation, efficiency and reliability. Also, the role of Non Destructive Evaluation (NDE) has evolved from simple detection tools to diagnostic tools that provide input into integrity assessment decisions, fitness-far-service and operational assessments. This new role was motivated by tighter regulatory requirements to assure the safety of the public and the environment, better SG life management strategies and often self-imposed regulations. It led to the development of advanced probe technologies, more reliable and versatile instruments and robotics, better training and qualification of personnel and better data management and analysis systems. This paper provides a brief historical perspective regarding the evolution of SG inspections and analyzes the motivations behind that

  15. Space Shuttle Communications Coverage Analysis for Thermal Tile Inspection

    Science.gov (United States)

    Kroll, Quin D.; Hwu, Shian U.; Upanavage, Matthew; Boster, John P.; Chavez, Mark A.

    2009-01-01

    The space shuttle ultra-high frequency Space-to-Space Communication System has to provide adequate communication coverage for astronauts who are performing thermal tile inspection and repair on the underside of the space shuttle orbiter (SSO). Careful planning and quantitative assessment are necessary to ensure successful system operations and mission safety in this work environment. This study assesses communication systems performance for astronauts who are working in the underside, non-line-of-sight shadow region on the space shuttle. All of the space shuttle and International Space Station (ISS) transmitting antennas are blocked by the SSO structure. To ensure communication coverage at planned inspection worksites, the signal strength and link margin between the SSO/ISS antennas and the extravehicular activity astronauts, whose line-of-sight is blocked by vehicle structure, was analyzed. Investigations were performed using rigorous computational electromagnetic modeling techniques. Signal strength was obtained by computing the reflected and diffracted fields along the signal propagation paths between transmitting and receiving antennas. Radio frequency (RF) coverage was determined for thermal tile inspection and repair missions using the results of this computation. Analysis results from this paper are important in formulating the limits on reliable communication range and RF coverage at planned underside inspection and repair worksites.

  16. AECB staff annual assessment of the Darlington Nuclear Generating Station for the year 1996

    International Nuclear Information System (INIS)

    1997-06-01

    The Atomic Energy Control Board is the independent federal agency that controls all nuclear activities in Canada. A major use of nuclear energy in Canada is electricity production. The AECB assesses every station's performance against legal requirements, including the conditions in the operating licence. Each station is inspected and all aspects of the station's operation and management is reviewed. This report is the AECB staff assessment of safety at the Darlington Nuclear Generating Station for 1996. Ontario Hydro operated the station in a safe manner in 1996. All four special safety systems were fully available 100 percent of the time. There were more problems that affected the safety support systems in 1996 than in the previous year

  17. Monitoring of the operation of a nuclear power station with design problems in an importing country: The Almaraz power station

    International Nuclear Information System (INIS)

    Reig, J.

    1984-01-01

    The purpose of this paper is to describe the regulatory activities carried out in Spain as a result of the design problem occurring in the steam generators during operation of Unit I of the Almaraz nuclear power station. First, a brief introduction is given to the operating history and characteristics of Unit I of Almaraz. Particular attention is paid to the specific licences issued subsequent to commercial operation which place limitations on the operation of the station and to the operational incidents of which the Nuclear Safety Council (CSN) has been notified. Next, a description is provided of the safety evaluation carried out by the CSN. Three aspects merit particular attention: methodology, evaluation and conclusions. The methodology applied by an importing country is normally based on that of the country of origin of the design, so that the overall evaluation by the NRC has been considered sufficiently representative of aspects specific to the Almaraz power station. In this regard the importance of international collaboration is clearly seen as a principal instrument for performing the evaluation. In the evaluation a distinction is made between general and specific aspects and between inspection programmes and quality assurance requirements. In addition, the conclusions leading to the requirement of the imposition of additional limitations on the operating licence are stated. Apart from the safety evaluation carried out by the CSN, other regulatory activities have been performed over this two-year period. These activities, which include site inspections, audits of the principal supplier company, other independent calculations and so on, are described. Lastly, the paper refers to the lessons learned from the operation of the above-mentioned unit, which are immediately applicable to other Spanish nuclear power stations. (author)

  18. 46 CFR 153.812 - Inspection for Certificate of Inspection.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Inspection for Certificate of Inspection. 153.812... CARGOES SHIPS CARRYING BULK LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Testing and Inspection § 153.812 Inspection for Certificate of Inspection. The rules governing the...

  19. Study on examples of safety culture enhancing activities at U.S. Nuclear Power Stations

    International Nuclear Information System (INIS)

    Ichiki, Kuniyasu

    2010-01-01

    After the wake of the incident of reactor vessel head degradation at Davis Basse in 2002, the NRC, the regulatory body in the U.S., included extraction of safety culture (SC) related elements from every failure into its inspection scheme of Reactor Oversight Process, since July 2006. The idea of SC itself was established some time ago, though, there are very few similar examples of such evaluation so far. This study is an attempt of making analyses on various activities with regard to SC in the U.S., to gain useful knowledge for considering the way to improve station's SC in Japan. Despite the fact that the numbers of inspection findings at stations are generally seen as unchanged, it is obvious that there are substantial difference in the number of the NRC's findings by each station. This appears to show that the condition of SC may largely different by stations. At several stations which accepted our investigation, those staff have made serious efforts to correct their area for improvements which were pointed out by the NRC. Such examples include improving management of their Corrective Action Program and establishing various measures to enable transmitting employee's concerns. It is thought that such activities aim to achieve efficient transfer of vital information among the station. This kind of activities should help every station solve various deficiencies in equipment, and also remove any obstacles in its communication. Their effort seem to result in not only the decrease in number of trouble but also much enhancement of mutual trust among the station, which would contribute to the great advance in their SC. (author)

  20. 9 CFR 89.2 - Two or more feedings at same station.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Two or more feedings at same station. 89.2 Section 89.2 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE INTERSTATE TRANSPORTATION OF ANIMALS (INCLUDING POULTRY) AND ANIMAL PRODUCTS STATEMENT...

  1. Inspection planning

    International Nuclear Information System (INIS)

    Korosec, D.; Levstek, M.F.

    2001-01-01

    Slovenian Nuclear Safety Administration (SNSA) division of nuclear and radiological safety inspection has developed systematic approach to their inspections. To be efficient in their efforts regarding regular and other types of inspections, in past years, the inspection plan has been developed. It is yearly based and organized on a such systematic way, that all areas of nuclear safety important activities of the licensee are covered. The inspection plan assures appropriate preparation for conducting the inspections, allows the overview of the progress regarding the areas to be covered during the year. Depending on the licensee activities and nature of facility (nuclear power plant, research reactor, radioactive waste storage, others), the plan has different levels of intensity of inspections and also their frequency. One of the basic approaches of the plan is to cover all nuclear and radiological important activities on such way, that all regulatory requests are fulfilled. In addition, the inspection plan is a good tool to improve inspection effectiveness based on previous experience and allows to have the oversight of the current status of fulfillment of planned inspections. Future improvement of the plan is necessary in the light of newest achievements on this field in the nuclear world, that means, new types of inspections are planned and will be incorporated into plan in next year.(author)

  2. Comparison of secondary system piping Cr content with inspection data

    International Nuclear Information System (INIS)

    Tapping, R.L.; Mitchell, A.M.

    1997-06-01

    For several years a number of Ontario Hydro and CANDU-6 stations have been sampling sections of secondary-side piping for chromium content. Several hundred of these measurements have been made, and comparisons with inspection data drawn. There is special interest in chromium concentrations in the range 0.01< Cr<0.1 wt.%, in order to better define the effect of trace chromium content on susceptibility to flow-assisted corrosion. (author)

  3. Remote Visual Testing (RVT) for the diagnostic inspection of feedwater heaters

    International Nuclear Information System (INIS)

    Nugent, M.J.; Pellegrino, B.A.

    1993-01-01

    Feedwater heaters are an important component in the overall plant heat rate, reliability, availability, performance and maintenance considerations at power stations. The ability to diagnose heater problems in-situ properly can lead to: (1) Preventative plugging of damaged, but unfailed tubes; (2) In-place repair procedures; (3) Incorporation of corrective actions into replacement designs or heater/unit operations. The benefits and limitations of Non-Destructive Testing (NDT) on feedwater heaters are briefly reviewed. All Remote Visual Testing (RVT) including borescopes, fiberscopes, videoborescopes and Closed Circuit Television (CCTV) cameras are discussed along with currently accepted formats for documentation. The benefits of a comprehensive in-place inspection involving Remote Visual Testing are discussed in relationship to its diagnostic capabilities. The results of eight post-service heater inspections are discussed along with the root cause of failure of seven unique failure mechanisms. These inspections, including FWH access, RVT tool and data analysis, are detailed. 13 figs

  4. Development of innovative inspection tools for higher reliability of PHWR fuel

    International Nuclear Information System (INIS)

    Kamalesh Kumar, B.; Viswanathan, B.; Laxminarayana, B.; Ganguly, C.

    2003-01-01

    'Full text:' Advent of Computer aided manufacturing systems has led to very high rate of production with greater reliability. The conventional inspection tools and systems, which are often manual based do not complement with output of highly automated production line. In order to overcome the deficiency, a strategic plan was developed for having automated inspection facility for PHWR fuel assembly line. Laser based systems with their inherently high accuracy and quick response times are a favorite for metrology purpose. Non-contact nature of laser-based measurement ensures minimal contamination, low wear and tear and good repeatability. So far two laser-based systems viz. Pellet density measurement systems and triangulation sensors have been developed. Laser based fuel pellet inspection system and PHWR fuel bundle metric station are under development. Machine vision-based systems have been developed to overcome certain limitations when inspection has to be carried out on such a large scale manually. These deficiencies arise from limitations of resolution, accessibility, fatigue and absence of quantification ability. These problems get further compounded in inspection of fuel components because of their relatively small sizes, close tolerances required and the reflective surfaces. PC based vision system has been developed for inspecting components and fuel assemblies. The paper would touch upon the details of the various laser systems and vision systems that have been indigenously developed for PHWR Fuel Metrology and their impact on the assembly production line. (author)

  5. Machine vision inspection of lace using a neural network

    Science.gov (United States)

    Sanby, Christopher; Norton-Wayne, Leonard

    1995-03-01

    Lace is particularly difficult to inspect using machine vision since it comprises a fine and complex pattern of threads which must be verified, on line and in real time. Small distortions in the pattern are unavoidable. This paper describes instrumentation for inspecting lace actually on the knitting machine. A CCD linescan camera synchronized to machine motions grabs an image of the lace. Differences between this lace image and a perfect prototype image are detected by comparison methods, thresholding techniques, and finally, a neural network (to distinguish real defects from false alarms). Though produced originally in a laboratory on SUN Sparc work-stations, the processing has subsequently been implemented on a 50 Mhz 486 PC-look-alike. Successful operation has been demonstrated in a factory, but over a restricted width. Full width coverage awaits provision of faster processing.

  6. AECB staff annual assessment of the Point Lepreau Nuclear Generating Station

    International Nuclear Information System (INIS)

    1997-06-01

    The Atomic Energy Control Board is the independent federal agency that controls all nuclear activities in Canada. A major use of nuclear energy in Canada is electricity production. The AECB assesses every station's performance against legal requirements, including the conditions in the operating licence. Each station is inspected and all aspects of the station's operation and management is reviewed. This report is the AECB staff assessment of reactor safety at the Point Lepreau Generating Station in 1996. Point Lepreau operated safely but the worsening trends in NB Power's safety performance leads to the conclusion that urgent action is required. NB Power is required to report formally to the AECB on progress with measures to improve safety management every six months. Further licensing action will be taken on NB Power if it fails to make the improvements

  7. AECL's participation in the commissioning of Point Lepreau generating station unit 1

    International Nuclear Information System (INIS)

    Chawla, S.; Singh, K.; Yerramilli, S.

    1983-05-01

    Support from Atomic Energy of Canada Ltd. (AECL) to Point Lepreau during the commissioning program has been in the form of: seconded staff for commissioning program management, preparation of commissioning procedures, and hands-on commissioning of several systems; analysis of test results; engineering service for problem solving and modifications; design engineering for changes and additions; procurement of urgently-needed parts and materials; technological advice; review of operational limits; interpretation of design manuals and assistance with and preparation of submissions to regulatory authorities; and development of equipment and procedures for inspection and repairs. This, together with AECL's experience in the commissioning of other 600 MWe stations, Douglas Point and Ontario Hydro stations, provides AECL with a wide range of expertise for providing operating station support services for CANDU stations

  8. Hydraulic oil control system for transformer stations

    International Nuclear Information System (INIS)

    Truong, P.

    2002-01-01

    'Full text:' Electrical oil control systems are commonly used to contain large volumes of spilled oil in transformer stations. Specially calibrated floats, some of which are designed to float only in oil and others only in water, are used in combination with a pump to contain oil at the catch basin below a transformer station.This electrical control system requires frequent maintenance and inspections to ensure the electrical system is not affected by any electrical surges. Also the floats need to be inspected and cleaned frequently to prevent oil or grit build up that may affect the systems' ability to contain oil.Recognizing the limitations of electrical oil control systems, Hydro One is investigating alternative control systems. A hydraulic oil control system is being investigated as an alternative which can backup oil in a containment area while allowing any water entering the containment area to pass through. Figure 1 shows a schematic of a bench-top model tested at Ryerson University. Oil and water separation occurs within the double-piped column. Oil and water are allowed to enter the external pipe column but only water is allowed to exit the internal pipe column. The internal pipe column is designed to generate enough hydrostatic pressure to ensure the oil is contained in the external pipe column.The hydraulic oil control system provides a reliable control mechanism and requires less maintenance compared to that of the electrical control system. Since the hydraulic oil control system has no moving parts, nor would any parts that require electricity, it is not affected by electrical surges such as lightening.The maintenance requirements of the hydraulic oil control system are: the removal of any oil and grit from the catch basin, and the occasional visual inspection for any crack or clogs in the system. (author)

  9. Advanced inspection technology for non intrusive inspection (NII) program

    International Nuclear Information System (INIS)

    Zamir Mohamed Daud

    2003-01-01

    In the current economic environment, plants and facilities are under pressure to introduced cost saving as well as profit maximising measures. Among the many changes in the way things are run is a move towards Risk Based Inspection (RBI), with an emphasis on longer operating periods between shutdowns as well as to utilise components to their maximum capability. Underpinning and RBI program requires good data from an effective online inspections program, which would not require the shutdown of critical components. One methodology of online inspection is known as Non Intrusive Inspection (NII), an inspection philosophy with the objective of replacing internal inspection of a vessel by doing Non Destructive Testing (NDT) and inspections externally. To this end, a variety of advanced NDT techniques are needed to provide accurate online measurements. (Author)

  10. Simulation in Quality Management – An Approach to Improve Inspection Planning

    Directory of Open Access Journals (Sweden)

    H.-A. Crostack

    2005-01-01

    Full Text Available Production is a multi-step process involving many different articles produced in different jobs by various machining stations. Quality inspection has to be integrated in the production sequence in order to ensure the conformance of the products. The interactions between manufacturing processes and inspections are very complex since three aspects (quality, cost, and time should all be considered at the same time while determining the suitable inspection strategy. Therefore, a simulation approach was introduced to solve this problem.The simulator called QUINTE [the QUINTE simulator has been developed at the University of Dortmund in the course of two research projects funded by the German Federal Ministry of Economics and Labour (BMWA: Bundesministerium für Wirtschaft und Arbeit, the Arbeitsgemeinschaft industrieller Forschungsvereinigungen (AiF, Cologne/Germany and the Forschungsgemeinschaft Qualität, Frankfurt a.M./Germany] was developed to simulate the machining as well as the inspection. It can be used to investigate and evaluate the inspection strategies in manufacturing processes. The investigation into the application of QUINTE simulator in industry was carried out at two pilot companies. The results show the validity of this simulator. An attempt to run QUINTE in a user-friendly environment, i.e., the commercial simulation software – Arena® is also described in this paper.NOTATION: QUINTE Qualität in der Teilefertigung  (Quality in  the manufacturing process  

  11. Exchange of pressurizer safeguarding system at Biblis nuclear power station

    International Nuclear Information System (INIS)

    Weber, D.; Hofbeck, W.

    1991-01-01

    Valves and piping of the pressurizer safeguarding system are exchanged and reset in such a way that they are suitable not only for discharging steam, but also for discharging a water-steam mixture and hot pressurized water; for the emergency measure of primary depressurization by hand (bleed) in the event of failure of the entire feedwater supply and station black-out, and in the event of operational transients with supposed failure of the reactor scram (ATWS). To achieve this, in addition to the requirements of the pressurizer discharging station, changes have to be made to the valve drive to dominate the water loads. During the 1990 inspection this exchange of the pressurizer discharging station was performed at the Biblis A unit as the first German plant. (orig.) [de

  12. Remote repair and inspection technics in Tokai reprocessing plant

    International Nuclear Information System (INIS)

    Koyama, Kenji; Ishibashi, Yuzo; Otani, Yosikuni

    1986-01-01

    Tokai reprocessing plant of Power Reactor and Nuclear Fuel Development Corp. is the only factory in Japan which treats 0.7 t/day of the spent fuel from LWR power stations and recovers remaining uranium and newly produced plutonium. Since the reprocessing plant started the hot test in September, 1977, about eight years have elapsed, and 233 t of spent fuel was treated as of August, 1985. During this period, the development of various remote working techniques have been carried out to cope with the failure of equipment and to strengthen the preventive maintenance of equipment. In this report, the development of the techniques for the remote repair of leaking dissolving tanks and the development of the remote inspection system for confirming the soundness of equipment in cells are described. In nuclear facilities, from the viewpoint of the reduction of radiation exposure accompanying the works under high radiation, labor saving, the increase of capacity factor by shortening the period of repair works, the improvement of safety and reliability of the facilities by perfecting checkup and inspection and so on, it is strongly desired to put robots in practical use for maintenance and inspection. (Kako, I.)

  13. Experience in surveillance of the prestress of concrete reactor vessels in Wylfa nuclear power station

    International Nuclear Information System (INIS)

    Dawson, P.; Paton, A.A.; Walsh, S.R.

    1989-01-01

    This paper describes experience gained in the in-service surveillance of the prestressing system for the prestressed concrete reactor vessels (PCRVs) at Wylfa nuclear power station. The paper gives details of results for the prestressing system obtained from the statutory in-service inspection program of the PCRVs. The program includes a detailed examination of a selection of prestressing tendon anchorages, anchorage load checks using a lift-off technique on a one percent sample of tendons and corrosion inspection of samples of prestressing strand and determination of their mechanical properties. The results obtained from the above in-service inspections have shown that the prestressing system continues to function within its design limits

  14. Calculation of frequency of optimal inspection in non-notice inspection game

    International Nuclear Information System (INIS)

    Kumakura, Shinichi; Gotoh, Yoshiki; Kikuchi, Masahiro

    2011-01-01

    We consider a non-notice inspection game between an inspection party, who verifies absence of diversion of nuclear materials and misuse of nuclear facility, and a facility operator, who tries them in a nuclear facility. In the game, the payoff for each player, inspection party and facility operator, is composed of various elements (parameters) such as facility type, a type of nuclear material, number of inspection and others. Their payoffs consist of profits and costs (minus profit). Because of random nature by non-notice inspection, its deterrence effect and inspection number could have the potential to affect their payoffs. In this paper, their payoffs taking into consideration of the inspection environment above are represented as a function of inspection number. Then, the optimal number is calculated from a condition on their payoffs for number of inspection. Comparable statics analysis is performed in order to observe the change of inspection number which is equilibrium point by changing these parameters including deterrence effect, because the number derived depends on each parameter within the inspection environment. Based on the analysis results, necessary conditions to reduce the inspection number keeping inspection effect are pointed out. (author)

  15. Overview of magnetic bias X-probe qualification and inspection of PNGS Monel 400 steam generator tubing

    International Nuclear Information System (INIS)

    Lepine, B.A.; Van Langen, J.; Obrutsky, L.

    2006-01-01

    This paper presents an overview of the X-probe MB 350, the qualification for detection of open OD axial crack-like flaws, and a selection of inspection results from the subsequent field inspections performed with this probe during the 2003 and 2004 period at Pickering Nuclear Generating Station A and B. Examples of the field indications to be presented are axial cracking, OD pitting at top of tubesheet location (TTS), and flow assisted corrosion (top hats). During the 2003 in-service eddy current inspection results of Pickering Nuclear Generating Station A (PNGS-A) Unit 2, a 13 mm (0.5 inch) long axial indication was detected by the CTR1 bobbin and CTR2-C4 array probes in Tube R25-C52 of Steam Generator (SG) 11 in the hot leg sludge pile region. An experimental magnetic bias X-probe, especially designed by Zetec for inspection of Monel 400 tubing, was deployed and the indication was characterized as a potential outer diameter (OD) axially oriented crack. Posterior tube pulling and destructive examination confirmed the presence of an Environmentally Assisted Crack (EAC), approximately 80% deep and 13 mm long. Due to the significance of this discovery, Ontario Power Generation (OPG) requested AECL to initiate a program for qualification of the X-Probe MB 350 for the detection of OD axial cracks in medium to high magnetic permeability (μ r ) Monel 400 PNGS-A and B steam generator tubing at different locations. The X-probe MB 350 subsequently has been deployed as a primary inspection probe for crack detection for PNGS steam generators. (author)

  16. Decentralized real time control system of inspection robot programmed in APL

    International Nuclear Information System (INIS)

    Dupeyrat, Benoit; Liabot, M.J.; Vertut, Jean

    1979-01-01

    The running of the SUPER PHENIX vessel inspection robot meets with special practical necessities: the distance between the robot and the computer responsible for its management is important since the piloting station is outside the safety enclosure. For this reason the control and alarm functions have been separated from those of strategy and readjustment. The system described here is thus made up of: a mini-computer to manage the piloting station and a microprocessor as close as possible to the machine for control and safety duties. This arrangement has the advantage of limiting the input/output volume of the mini-computer which can thus be programmed in APL, a language particularly efficient and well suited to the problem [fr

  17. 18 CFR 1304.403 - Marina sewage pump-out stations and holding tanks.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Marina sewage pump-out... OTHER ALTERATIONS Miscellaneous § 1304.403 Marina sewage pump-out stations and holding tanks. All pump... purposes of inspection; (i) Spill-proof features adequate for transfer of sewage from all movable floating...

  18. Pathology Residents Comprise Inspection Team for a CAP Self-Inspection

    Directory of Open Access Journals (Sweden)

    Stacy G. Beal MD

    2017-03-01

    Full Text Available We report our experience at the University of Florida in which residents and fellows served as the inspection team for a College of American Pathologists (CAP self-inspection. We aimed to determine whether the CAP self-inspection could serve as a learning opportunity for pathology residents and fellows. To prepare for the inspection, we provided a series of 4 lunchtime seminars covering numerous laboratory management topics relating to inspections and laboratory quality. Preparation for the inspection began approximately 4 months prior to the date of the inspection. The intent was to simulate a CAP peer inspection, with the exception that the date was announced. The associate residency program director served as the team leader. All residents and fellows completed inspector training provided by CAP, and the team leader completed the team leader training. A 20 question pre- and posttest was administered; additionally, an anonymous survey was given after the inspection. The residents’ and fellows’ posttest scores were an average of 15% higher than on the pretest ( P < .01. The surveys as well as subjective comments were overwhelmingly positive. In conclusion, the resident’s and fellow’s experience as an inspector during a CAP self-inspection was a useful tool to learn accreditation and laboratory management.

  19. Risk informed inservice inspection evaluation of the ComEd nuclear plants

    International Nuclear Information System (INIS)

    Fleming, K.N.; Hutchinson, J.J.

    2000-01-01

    In November, 1999 Commonwealth Edison Company began the largest scope project yet performed to implement risk informed in-service inspection programs for piping systems. A contractor team led by ERIN Engineering and Research was selected to perform full scope risk informed evaluations on ten reactor units at five sites including 3 BWR and 2 PWR stations. This risk informed evaluation has applied a number of advancements to RISI technology in key areas including risk quantification of inspection program changes, element selection, treatment of multiple damage mechanisms at a given location, and in streamlining an approach to RISI initially developed by EPRI. The scope of the evaluation covered more than 18,000 ASME Class 1 and 2 welds not counting those that will continue to be inspected as part of augmented programs for flow accelerated corrosion, stress corrosion cracking, and service water systems. When the current ASME Section XI based exams are replaced by the risk informed program, while some new inspection locations will be added, substantial cost savings and person-rem exposures are projected from the elimination of most of the current exams. ComEd expects to recover its investment in the RISI evaluation for each of the 10 reactor units in 1 to 2 refueling outages, from the cost savings of reduced inspections. At the same time, the risk of a severe accident due to pipe ruptures is not expected to exhibit significant changes. (author)

  20. Ultrasonic inspection

    International Nuclear Information System (INIS)

    Satittada, Gannaga

    1984-01-01

    Ultrasonic inspection is one of the most widely used methods for nondestructive inspection. The beam of high-frequency sound wave, ultrasonic wave, is introduced into the material. It travels through the material with some attendant loss of energy and can be reflected at interfaces. The reflected beam is detected and analyzed. Ultrasonic inspection is used to detect flaws in metal parts as well as in welded, brazed and bonded joints during research work and developing production and service. It is also used to detect and locate porosity, pipe, and flakes. In addition, it can be used for the measurement of metal thickness. Ultrasonic inspection is therefore used for quality control and material inspection in all major industries

  1. Problems of optimization of activities of sanitary and epidemiological stations on radiation protection

    International Nuclear Information System (INIS)

    Poplavskij, K.K.

    1989-01-01

    Problems of activity optimization of the sanitary and epidemiologic stations (SES) concerning state inspection of for radiation source application are considered to improve the effort efficiency of the radiological subdivisions. The necessity to specify the inspection objects is shown. Inspection of all the stages of creation, introduction and application of radioactive substances and other sources, as well as, of radioactive waste utilization remains urgent problem. Determination of internal and external radiation doses to population in different regions as well as, radiation protection of personnel and patients in nuclear medicine are vital problems as well. Justification of the necessity to enlist specialists in different fields, to determine rationally their functional duties presents sufficient component of the SES activity optimization. Usage optimization of dosimetric and radiometric devices, laboratory equipment and instruments is a vital problem

  2. SmartInspect: Smart Contract Inspection Technical Report

    OpenAIRE

    Bragagnolo , Santiago; Rocha , Henrique ,; Denker , Marcus; Ducasse , Stéphane

    2017-01-01

    Smart contracts are embedded procedures stored with the data they act upon. Debugging deployed Smart Contracts is a difficult task since once deployed, the code cannot be reexecuted and inspecting a simple attribute is not easily possible because data is encoded. In this technical report, we present SmartInspect to address the lack of inspectability of a deployed contract. Our solution analyses the contract state by using decompilation techniques and a mirror-based architecture to represent t...

  3. RPII Inspection and Licensing Activities and Annual Inspection Programme for 2011

    International Nuclear Information System (INIS)

    2010-07-01

    The objective of this report is to provide an overview of inspection activities of the Radiological Protection Institute of Ireland, to examine the evolution in licensee numbers and to outline the rationale in developing annual inspection programmes. All inspection activities are now carried out within the framework of a quality management system including: inspection planning, the training of inspectors, the conduct of inspections as well as inspection follow up and review. The report also provides an overview of the main features of the quality system

  4. RPII Inspection and Licensing Activities and Annual Inspection Programme for 2013

    International Nuclear Information System (INIS)

    2013-04-01

    The objective of this report is to provide an overview of inspection activities of the Radiological Protection Institute of Ireland RPII, to examine the evolution in licensee numbers and to outline the rationale in developing annual inspection programmes. All inspection activities are now carried out within the framework of a quality management system including inspection planning, the training of inspectors, the conduct of inspections as well as post inspection follow up and review. This report also provides an overview of the main features of the quality system

  5. Oconee Nuclear Station, Units 1, 2, and 3. Semiannual operating report, January--June 1975

    International Nuclear Information System (INIS)

    1975-01-01

    Information is presented concerning operations, performance characteristics, changes, tests, inspections, containment leak tests, maintenance, primary coolant chemistry, station staff changes, reservoir investigations, plume mapping, and operational environmental radioactivity monitoring data for oconee Units 1, 2, and 3. The non-radiological environmental surveillance program is also described. (FS)

  6. Inspection logistics planning for multi-stage production systems with applications to semiconductor fabrication lines

    Science.gov (United States)

    Chen, Kyle Dakai

    Since the market for semiconductor products has become more lucrative and competitive, research into improving yields for semiconductor fabrication lines has lately received a tremendous amount of attention. One of the most critical tasks in achieving such yield improvements is to plan the in-line inspection sampling efficiently so that any potential yield problems can be detected early and eliminated quickly. We formulate a multi-stage inspection planning model based on configurations in actual semiconductor fabrication lines, specifically taking into account both the capacity constraint and the congestion effects at the inspection station. We propose a new mixed First-Come-First-Serve (FCFS) and Last-Come-First-Serve (LCFS) discipline for serving the inspection samples to expedite the detection of potential yield problems. Employing this mixed FCFS and LCFS discipline, we derive approximate expressions for the queueing delays in yield problem detection time and develop near-optimal algorithms to obtain the inspection logistics planning policies. We also investigate the queueing performance with this mixed type of service discipline under different assumptions and configurations. In addition, we conduct numerical tests and generate managerial insights based on input data from actual semiconductor fabrication lines. To the best of our knowledge, this research is novel in developing, for the first time in the literature, near-optimal results for inspection logistics planning in multi-stage production systems with congestion effects explicitly considered.

  7. Inspection vehicle

    International Nuclear Information System (INIS)

    Takahashi, Masaki; Omote, Tatsuyuki; Yoneya, Yutaka; Tanaka, Keiji; Waki, Tetsuro; Yoshida, Tomiji; Kido, Tsuyoshi.

    1993-01-01

    An inspection vehicle comprises a small-sized battery directly connected with a power motor or a direct power source from trolly lines and a switching circuit operated by external signals. The switch judges advance or retreat by two kinds of signals and the inspection vehicle is recovered by self-running. In order to recover the abnormally stopped inspection vehicle to the targeted place, the inspection vehicle is made in a free-running state by using a clutch mechanism and is pushed by an other vehicle. (T.M.)

  8. Pre-service inspection and in-service inspection in Japan

    International Nuclear Information System (INIS)

    Uebayashi, T.; Miyake, Y.

    1985-01-01

    To ensure the safety of nuclear power plant, pre-service inspection/in-service inspection (PSI/ISI) has an important role, and informations obtained from various inspections during plant shut-down period are contributing to establish effective preventive maintenance activities for plant facilities. It might be said that the high level of availability of Japanese light-water nuclear power plants in these two or three years has been achieved by those efforts. In case of Japan, inspections to be carried out during scheduled plant shut-down period are not limited to code requirements but include many other inspections which are mostly reflected from troubles experienced in both domestic and overseas plants. Usually, those additional inspections are performed by Ministry of Trade and Industries' (MITI's) regulator and/or tentative requirement and considered as ISI in broad meaning. To achieve high availability of plant, it is essential to avoid unscheduled shut-down and to shorten inspection period. The developments of new technology to perform effective ISI for operating plants are continued, but on the other hand it is also very important to pay a great consideration to inspectability of the plants at the stage of plant engineering. With the leadership of MITI, improvement and standardization of light-water nuclear power plant has been proceeded and newly constructed plants have great advantage from the point of view on ISI

  9. Natural Gas Vehicle Cylinder Safety, Training and Inspection Project

    Energy Technology Data Exchange (ETDEWEB)

    Hank Seiff

    2008-12-31

    Under the auspices of the National Energy Technology Laboratory and the US Department of Energy, the Clean Vehicle Education Foundation conducted a three-year program to increase the understanding of the safe and proper use and maintenance of vehicular compressed natural gas (CNG) fuel systems. High-pressure fuel systems require periodic inspection and maintenance to insure safe and proper operation. The project addressed the needs of CNG fuel containers (cylinders) and associated high-pressure fuel system components related to existing law, codes and standards (C&S), available training and inspection programs, and assured coordination among vehicle users, public safety officials, fueling station operators and training providers. The program included a public and industry awareness campaign, establishment and administration of a cylinder inspector certification training scholarship program, evaluation of current safety training and testing practices, monitoring and investigation of CNG vehicle incidents, evaluation of a cylinder recertification program and the migration of CNG vehicle safety knowledge to the nascent hydrogen vehicle community.

  10. Pre-service baseline inspection using x-probe of Oconee replacement steam generators

    International Nuclear Information System (INIS)

    Addario, M.; Shipp, P.; Davis, K.; Fogal, C.

    2003-01-01

    The eddy current method has been the industry standard for inspecting steam generator tubing for many years and the level of sophistication of coil technology has continued to evolve during that time. State of the art array probe systems now employ multiple sensitivity zones in the probe to better detect and characterize defects in an efficient manner. Owners and regulators of nuclear power plants are interested in the most effective and efficient inspection possible. The ultimate goal has been to meet or exceed new and existing regulatory and design requirements by maximizing the quantity and quality of eddy current data collected while minimizing both the time needed to perform the inspection and the radiation exposure. The X-Probe is an example of this new eddy current array technology. Qualified to detect all types of known defects in steam generator tubing, the technology is comprised of a system of probe, data acquisition instrumentation, computer and human interface software. Recently, Duke Power, along with Babcock and Wilcox Canada and the system developer R/D Tech, collaborated to implement this technology in a first of a kind full scale pre-service inspection of replacement steam generators for Duke Power's Oconee nuclear generating station at Babcock and Wilcox Canada's Cambridge plant. The discussion in this paper will briefly describe the X-Probe technology, describe the system required to perform the inspection, present the general results of the inspection and finally draw some comparative benefit conclusions for both pre-service and in-service applications. (author)

  11. AECB staff annual assessment of the Bruce A Nuclear Generating Station for the year 1996

    International Nuclear Information System (INIS)

    1997-06-01

    The Atomic Energy Control Board is the independent federal agency that controls all nuclear activities in Canada. A major use of nuclear energy in Canada is electricity production. The AECB assesses every station's performance against legal requirements, including the conditions in the operating licence. Each station is inspected and all aspects of the station's operation and management is reviewed. This report is the AECB staff assessment of reactor safety at the Bruce Nuclear Generating Station A for 1996. Ontario Hydro operated Bruce A safely in 1996, maintaining the risk to workers and the public at an acceptably low level. Special safety system performance at Bruce A was adequate. Availability targets were all met. Improvement is needed to reduce the number of operating licence non-compliances

  12. Research on application of knowledge engineering to nuclear power stations

    International Nuclear Information System (INIS)

    Umeda, Takeo; Kiyohashi, Satoshi

    1990-01-01

    Recently, the research on the software and hardware regarding knowledge engineering has been advanced eagerly. Especially the applicability of expert systems is high. When expert systems are introduced into nuclear power stations, it is necessary to make the plan for introduction based on the detailed knowledge on the works in nuclear power stations, and to improve the system repeatedly by adopting the opinion and request of those in charge upon the trial use. Tohoku Electric Power Co. was able to develop the expert system of practically usable scale 'Supporting system for deciding fuel movement procedure'. The survey and analysis of the works in nuclear power stations, the selection of the system to be developed and so on are reported. In No. 1 plant of Onagawa Nuclear Power Station of BWR type, up to 1/3 of the fuel is replaced at the time of the regular inspection. Some fuel must be taken to outside for ensuring the working space. The works of deciding fuel movement procedure, the development of the system and its evaluation are described. (K.I.)

  13. A Bayesian analysis of component life expectancy and its implications on the inspection schedule

    International Nuclear Information System (INIS)

    Mason, Paolo

    2017-01-01

    A model of crack initiation and residual component life is fitted to the inspection history, inclusive of two in-service failures, of a set of gas circulator impellers at two UK power stations. The model is then used to estimate the probability of future in-service failure of each item in scenarios in which the next opportunity for inspection (i.e. detection of a developing crack) is exploited or forgone. The study takes into account in exact manner both variability and uncertainty. A novel Approximate Bayesian Computation (ABC) methodology is introduced for the quantification of uncertainty, i.e. the sampling of the posterior distribution of the parameters of the model. At the price of the discretization of this distribution, the methodology represents a quickly implemented option in problems where standard ABC rejection sampling is unacceptably inefficient. - Highlights: • A model of crack initiation and residual component life is introduced. • The model is fitted to the inspection log of a set of gas circulator impellers. • The odds of future failure are computed under different inspection schedules. • This prediction informs the choice to perform or forgo future inspection. • A novel Approximate Bayesian Computation algorithm is introduced and validated.

  14. AECB staff annual assessment of the Pickering A and B Nuclear Generating Stations for the year 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    The Pickering Nuclear Generating Station (PNGS) is located on the north shore of Lake Ontario, about 32 km east of downtown Toronto. It consists of two stations, PNGS-A and PNGS-B. Each station contains four reactor units. PNGS-A consists of Units 1 to 4, while PNGS-B consists of Units 5 to 8. Each unit can generate about 540 megawatts of electricity. All eight units are located within a single enclosure. Ontario Hydro`s Pickering Nuclear Division has assigned one Station Director with authority over both stations, but each station has its own organization. AECB issue a separate operating licence for each station. This report presents the Atomic Energy Control Board staff assessment of the Pickering stations` safety performance in 1994 and other aspects that they consider to have significant impact on nuclear safety. AECB based their conclusions on their observations, audits, inspections and review of information that Ontario Hydro submits to them as required by the station Operating Licences. 11 tabs., 8 figs.

  15. AECB staff annual assessment of the Pickering A and B Nuclear Generating Stations for the year 1994

    International Nuclear Information System (INIS)

    1995-06-01

    The Pickering Nuclear Generating Station (PNGS) is located on the north shore of Lake Ontario, about 32 km east of downtown Toronto. It consists of two stations, PNGS-A and PNGS-B. Each station contains four reactor units. PNGS-A consists of Units 1 to 4, while PNGS-B consists of Units 5 to 8. Each unit can generate about 540 megawatts of electricity. All eight units are located within a single enclosure. Ontario Hydro's Pickering Nuclear Division has assigned one Station Director with authority over both stations, but each station has its own organization. AECB issue a separate operating licence for each station. This report presents the Atomic Energy Control Board staff assessment of the Pickering stations' safety performance in 1994 and other aspects that they consider to have significant impact on nuclear safety. AECB based their conclusions on their observations, audits, inspections and review of information that Ontario Hydro submits to them as required by the station Operating Licences. 11 tabs., 8 figs

  16. Compact and air-transportable ultrasonic turbine disc bore inspection system

    International Nuclear Information System (INIS)

    Larsen, R.E.; Leon-Salamanca, T.

    1990-01-01

    A compact, lightweight, air-transportable ultrasonic inspection system for bore and keyway regions of shrunk-on turbine discs has been developed. The system utilizes a proprietary ultrasound liquid coupling technique in conjunction with a single pair of gimballed search units to achieve rapid and thorough coverage of bores and keyways in both heavy nuclear and standard fossil discs of nearly any size and having any conceivable web surface contour. Search unit positioning and angulation parameter settings are established in near real-time through a computation algorithm based on a compact vector ray tracing protocol. Modular construction and the use of lightweight, stiff materials throughout facilitates air shipment of the system and its rapid deployment at continental and overseas field sites. Mechanical and ultrasonic features of the system are described. Development and application of the computation algorithm to the ultrasonic inspection of heavy discs at an overseas power station is discussed

  17. Inspection of NFT-type cask fabrication

    International Nuclear Information System (INIS)

    Takani, M.; Umegaki, O.

    1998-01-01

    NFT-type cask has been developed to transport the high burn-up spent fuel from Japanese nuclear power stations to the reprocessing plant of Japan Nuclear Fuel Limited which is under construction in Rokkasho-mura, Aomori prefecture. NFT placed orders of 53 casks to 5 fabricators in Japan and overseas, and these casks have been fabricated since 1994. There are two types of NFT-type casks for PWR spent fuel and four types of NFT-type cask for BWR spent fuel. These are designed in consideration of the number of spent fuels accommodated into each type of casks and the handling conditions at domestic nuclear power stations. According to Japanese notification, it is required to be confirmed by competent authority that casks are manufactured in accordance with approved designs. Furthermore, additional tests are performed such as through-gauge test for basket and pressure test on the shielding material space to ensure the performance of cask by NFT other than items inspected by the competent authority. In order to enhance maintainability of casks, replacement parts such as bolts and valves are shared as much as possible. (authors)

  18. Remote inspection through a virtual world

    Energy Technology Data Exchange (ETDEWEB)

    Lee, D.J.

    1996-05-01

    Virtual Reality (VR) is an expression that is most often associated with the entertainment industry. At Torness Power Station however, VR technology has been successfully applied to recovery operations with significant time and cost benefits. This paper describes the nature of the VR applications at Torness and its proposed development for remote reactor inspection. The present programme has provided several challenges to the VR system capabilities which are described together with details of how these are being overcome. Efficient computer model development and user-friendly operator interfaces are established as essential ingredients. These factors are being achieved in a progressive manner and there is confidence that significant operational improvements will be achieved through the application of this rapidly developing technology. (author).

  19. Remote inspection through a virtual world

    International Nuclear Information System (INIS)

    Lee, D.J.

    1996-01-01

    Virtual Reality (VR) is an expression that is most often associated with the entertainment industry. At Torness Power Station however, VR technology has been successfully applied to recovery operations with significant time and cost benefits. This paper describes the nature of the VR applications at Torness and its proposed development for remote reactor inspection. The present programme has provided several challenges to the VR system capabilities which are described together with details of how these are being overcome. Efficient computer model development and user-friendly operator interfaces are established as essential ingredients. These factors are being achieved in a progressive manner and there is confidence that significant operational improvements will be achieved through the application of this rapidly developing technology. (author)

  20. Nuclear safeguards control in nuclear power stations

    International Nuclear Information System (INIS)

    Boedege, R.; Braatz, U.; Heger, H.

    1976-01-01

    The execution of the Non-Proliferation Treaty (NPT) has initiated a third phase in the efforts taken to ensure peace by limiting the number of atomic powers. In this phase it is important, above all, to turn into workable systems the conditions imposed upon technology by the different provisions of the Verification Agreement of the NPT. This is achieved mainly by elaborating annexes to the Agreement specifically geared to certain model plants, typical representatives selected for LWR power stations being the plants at Garigliano, Italy (BWR), and Stade, Federal Republic of Germany (PWR). The surveillance measures taken to prevent any diversion of special nuclear material for purposes of nuclear weapons manufacture must be effective in achieving their specific objective and must not impede the circumspect management of operations of the plants concerned. A VDEW working party has studied the technical details of the planned surveillance measures in nuclear power stations in the Federal Republic of Germany and now presents a concept of material balancing by units which meets the conditions imposed by the inspection authority and could also be accepted by the operators of nuclear power stations. The concept provides for uninterrupted control of the material balance areas of the nuclear power stations concerned, allows continuous control of the whole nuclear fuel cycle, is based exclusively on existing methods and facilities, and can be implemented at low cost. (orig.) [de

  1. Software Formal Inspections Guidebook

    Science.gov (United States)

    1993-01-01

    The Software Formal Inspections Guidebook is designed to support the inspection process of software developed by and for NASA. This document provides information on how to implement a recommended and proven method for conducting formal inspections of NASA software. This Guidebook is a companion document to NASA Standard 2202-93, Software Formal Inspections Standard, approved April 1993, which provides the rules, procedures, and specific requirements for conducting software formal inspections. Application of the Formal Inspections Standard is optional to NASA program or project management. In cases where program or project management decide to use the formal inspections method, this Guidebook provides additional information on how to establish and implement the process. The goal of the formal inspections process as documented in the above-mentioned Standard and this Guidebook is to provide a framework and model for an inspection process that will enable the detection and elimination of defects as early as possible in the software life cycle. An ancillary aspect of the formal inspection process incorporates the collection and analysis of inspection data to effect continual improvement in the inspection process and the quality of the software subjected to the process.

  2. Refurbishment of Point Lepreau Generating Station

    International Nuclear Information System (INIS)

    Thompson, P.D.; Jaitly, R.; Ichiyen, N.; Petrilli, M.A.

    2004-01-01

    NB Power is planning to conduct an 18-month maintenance outage of the Point Lepreau Generating Station (PLGS) beginning in April 2008. The major activity would be the replacement of all 380 Fuel Channel and Calandria Tube Assemblies and the connecting feeder pipes. This activity is referred to as Retube. NB Power would also take advantage of this outage to conduct a number of repairs, replacements, inspections and upgrades (such as rewinding or replacing the generator, replacement of shutdown system trip computers, replacement of certain valves and expansion joints, inspection of systems not normally accessible, etc). These collective activities are referred to as Refurbishment. This would allow the station to operate for an additional 25 to 30 years. The scope of the project was determined from the outcome of a two-year study involving a detailed condition assessment of the station that examined issues relating to ageing and obsolescence. The majority of the plant components were found to be capable of supporting extended operation without needing replacement or changes. In addition to the condition assessment, a detailed review of Safety and Licensing issues associated with extended operation was performed. This included a review of known regulatory and safety issues, comparison of the station against current codes and standards, and comparison of the station against safety related modifications made to more recent CANDU 6 units. Benefit cost analyses (BCA) were performed to assist the utility in determining which changes were appropriate to include in the project scope. As a Probabilistic Safety Assessment (PSA) for PLGS did not exist at the time, a risk baseline for the station had to be determined for use in the BCA. Extensive dialogue with the Canadian Nuclear Safety Commission staff was also undertaken during this phase. A comprehensive Licensing Framework was produced upon which the CNSC provided feedback to NB Power. This feedback was important in terms of

  3. Dose reduction for snubber inspection and testing

    International Nuclear Information System (INIS)

    Morrison, G.M.; Cotton, S.R.

    1991-01-01

    This paper reports that Health physics staff members at Grand Gulf Nuclear Station have implemented several dose reduction methods for snubber inspection, testing and changeout. These methods include construction maps to permit easy location of snubbers in the drywell, painting azimuth numbers on the inside drywell wall and biological shield wall to coincide with the maps, requiring pre-job briefings for quality inspectors and craft support personnel, using job history files for work planning, using experienced inspectors and craft personnel whenever possible, designating certain craft personnel solely for snubber work, and cutting out stuck snubber pins rather than attempting intact removal. The total dose for snubber-related tasks has been significantly reduced using these methods

  4. Shell Inspection History and Current CMM Inspection Efforts

    Energy Technology Data Exchange (ETDEWEB)

    Montano, Joshua Daniel [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-01-26

    The following report provides a review of past and current CMM Shell Inspection efforts. Calibration of the Sheffield rotary contour gauge has expired and the primary inspector, Matthew Naranjo, has retired. Efforts within the Inspection team are transitioning from maintaining and training new inspectors on Sheffield to off-the-shelf CMM technology. Although inspection of a shell has many requirements, the scope of the data presented in this report focuses on the inner contour, outer contour, radial wall thickness and mass comparisons.

  5. Randomization of inspections

    International Nuclear Information System (INIS)

    Markin, J.T.

    1989-01-01

    As the numbers and complexity of nuclear facilities increase, limitations on resources for international safeguards may restrict attainment of safeguards goals. One option for improving the efficiency of limited resources is to expand the current inspection regime to include random allocation of the amount and frequency of inspection effort to material strata or to facilities. This paper identifies the changes in safeguards policy, administrative procedures, and operational procedures that would be necessary to accommodate randomized inspections and identifies those situations where randomization can improve inspection efficiency and those situations where the current nonrandom inspections should be maintained. 9 refs., 1 tab

  6. Integrated management model. Methodology and software-enabled tood designed to assist a utility in developing a station-wide optimization

    International Nuclear Information System (INIS)

    Llovet, R.; Ibanez, R.; Woodcock, J.

    2005-01-01

    A key concern for utilities today is optimizing station aging and realibility management activities in a manner that maximizes the value of those activities withing an affordable budget. The Westinghouse Proactive Asset Management Model is a methodology and software-enabled tood designed to assist a utility in developing a station-wide optimization of those activities. The process and tool support the development of an optimized, station-wide plan for inspection, testing, maintenance, repaor and replacement of aging components. The optimization identifies the benefit and optimal timing of those activities based on minimizing unplanned outage costs (avoided costs) and maximizing station Net Present Value. (Author)

  7. Inspection of internal tank welds using the ACFM inspection method

    International Nuclear Information System (INIS)

    Topp, D.A.; Lugg, M.C.

    2009-01-01

    The paper describes recent developments of the ACFM technique and describes several case studies where ACFM has been used to inspect the internal plate welds on large steel storage tanks in refineries. For weld inspection, conventional methods such as magnetic particle inspection or vacuum box testing are generally used. This paper presents comparisons of the results from ACFM with those from the conventional methods, from which conclusions are drawn as to the benefits this technique offers in terms of cost, time savings and inspection reliability. (author)

  8. Obrigheim nuclear power station. Annual report 1987

    International Nuclear Information System (INIS)

    Koerner, C.

    1988-01-01

    The Obrigheim nuclear power station was operated at full load during the year 1987; 7.351 operating hours procuded electrical energy of 2.607 GWh. This is the fifth best annual result during Obrigheim's operating period. Since commissioning in October 1968, 139.310 hours of operation have generated 46.681 GWh (gross) and from test operation in March 1969 until the end of 1987, 138.530 hours of operation have generated 46.569 GWh. This is an availability of power of 81.6% in this period and a time availability of 83.9%. In 1987, the plant was shut down for 1.222 hours for the 18th refueling including testing, inspection and repair work. Apart from refueling, the plant had a good time availability and therefore contributed 5% to the safe, economical and environmentally acceptable electricity supply of the Land Baden-Wuerttemberg. The power station is of great significance to the region, both in terms of power supply and the economy. (orig./HP) [de

  9. 8 x 8 fuel surveillance program at Monticello site - end of Cycle 6: fourth post-irradiation inspection, October 1978

    International Nuclear Information System (INIS)

    Skarshaug, N.H.

    1980-09-01

    A fuel surveillance program for a lead 8 x 8 reload fuel assembly was implemented at the Monticello Nuclear Power Station in May 1974 prior to Reactor Cycle 3. Inspection results of the fourth post-irradiation inspection performed on this surveillance fuel assembly in October 1978 at EOC 6, after a bundle average exposure of 25,900 MWd/MT, are presented. The measurement techniques, results obtained and comparisons to previous measurements are discussed. The bundle and individual rods examined exhibited characteristics of normal operation and were approved for continued irradiation during Monticello operating Cycle 7

  10. RPII Inspection and Licensing Activities and Annual Inspection Programme for 2012

    International Nuclear Information System (INIS)

    2012-04-01

    The purpose of this document is to promote transparency in the activities of the RPII. It explains aspects of the internal workings of the Regulation and Information Management Division of the Institute to aid understanding of the processes and decisions of that Division which may impact on licensees and other interested parties. The objective of the report is to provide an overview of inspection activities of the RPII, to examine the evolution in licensee numbers and to outline the rationale in developing annual inspection programmes. All inspection activities are now carried out within the framework of a quality management system including; inspection planning, the training of inspectors, the conduct of inspections, as well as post inspection follow up and review. This report also provides an overview of the main features of the quality system

  11. Summary of experience from a large number of construction inspections; Wind power plant projects; Erfarenhetsaaterfoering fraan entreprenadbesiktningar

    Energy Technology Data Exchange (ETDEWEB)

    Andersson, Bertil; Holmberg, Rikard

    2010-08-15

    This report presents a summary of experience from a large number of construction inspections of wind power projects. The working method is based on the collection of construction experience in form of questionnaires. The questionnaires were supplemented by a number of in-depth interviews to understand more in detail what is perceived to be a problem and if there were suggestions for improvements. The results in this report is based on inspection protocols from 174 wind turbines, which corresponds to about one-third of the power plants built in the time period. In total the questionnaires included 4683 inspection remarks as well as about one hundred free text comments. 52 of the 174 inspected power stations were rejected, corresponding to 30%. It has not been possible to identify any over represented type of remark as a main cause of rejection, but the rejection is usually based on a total number of remarks that is too large. The average number of remarks for a power plant is 27. Most power stations have between 20 and 35 remarks. The most common remarks concern shortcomings in marking and documentation. These are easily adjusted, and may be regarded as less serious. There are, however, a number of remarks which are recurrent and quite serious, mainly regarding gearbox, education and lightning protection. Usually these are also easily adjusted, but the consequences if not corrected can be very large. The consequences may be either shortened life of expensive components, e.g. oil problems in gear boxes, or increased probability of serious accidents, e.g. maladjusted lightning protection. In the report, comparison between power stations with various construction period, size, supplier, geography and topography is also presented. The general conclusion is that the differences are small. The results of the evaluation of questionnaires correspond well with the result of the in-depth interviews with clients. The problem that clients agreed upon as the greatest is the lack

  12. Technology Assessment of the Inspection Readiness Plan in Chemical Weapons Convention Challenge Inspections

    National Research Council Canada - National Science Library

    Woodley, Anthony

    1998-01-01

    ...) Challenge Inspections. The CWC is an intrusive inspection. The Challenge Inspection allows for a team of international inspectors to inspect on very short notice a naval facility suspected of violating the CWC...

  13. Process Improvement to the Inspection Readiness Plan in Chemical Weapons Convention Challenge Inspections

    National Research Council Canada - National Science Library

    Triplett, William

    1997-01-01

    ...) Challenge Inspection. The CWC is an intensive inspection. The Challenge Inspection allows for a team of international inspectors to inspect a naval facility suspected of violating the CWC on very short notice...

  14. General inspection strategy for fault diagnosis-minimizing the inspection costs

    International Nuclear Information System (INIS)

    Reinertsen, Rune; Wang Xiaozhong

    1995-01-01

    In this paper, a general inspection strategy for system fault diagnosis is presented. The procedure presented in this paper, is an improvement of methods described in papers by , and . This general strategy provides the optimal inspection procedure when the inspections require unequal effort and the minimum cut set probabilities are unequal. This feature makes the procedure described in this paper more useful for practical applications than the most recent procedure presented in the paper by Najmus-Saqib and Ishaque, which requires the minimum cut set probabilities to be equal. The inspection strategy described in this paper is based on first inspecting the basic event that will provide the maximum information gain per unit cost invested. The information gain is measured by the decrease of Shannon entropy. A detailed tutorial example is presented

  15. Cargo container inspection test program at ARPA's Nonintrusive Inspection Technology Testbed

    Science.gov (United States)

    Volberding, Roy W.; Khan, Siraj M.

    1994-10-01

    An x-ray-based cargo inspection system test program is being conducted at the Advanced Research Project Agency (ARPA)-sponsored Nonintrusive Inspection Technology Testbed (NITT) located in the Port of Tacoma, Washington. The test program seeks to determine the performance that can be expected from a dual, high-energy x-ray cargo inspection system when inspecting ISO cargo containers. This paper describes an intensive, three-month, system test involving two independent test groups, one representing the criminal smuggling element and the other representing the law enforcement community. The first group, the `Red Team', prepares ISO containers for inspection at an off-site facility. An algorithm randomly selects and indicates the positions and preparation of cargoes within a container. The prepared container is dispatched to the NITT for inspection by the `Blue Team'. After in-gate processing, it is queued for examination. The Blue Team inspects the container and decides whether or not to pass the container. The shipment undergoes out-gate processing and returns to the Red Team. The results of the inspection are recorded for subsequent analysis. The test process, including its governing protocol, the cargoes, container preparation, the examination and results available at the time of submission are presented.

  16. Inspection Database

    Data.gov (United States)

    U.S. Department of Health & Human Services — FDA is disclosing the final inspection classification for inspections related to currently marketed FDA-regulated products. The disclosure of this information is not...

  17. Development of nondestructive evaluation techniques for DAM inspection. Progress report, January 1995 through August 1997

    Energy Technology Data Exchange (ETDEWEB)

    Brown, A. E.; Thomas, G.H.

    1997-09-04

    The Lawrence Livermore National Laboratory has concluded a two and a half year study on the development of an ultrasonic inspection system to inspect post stressed steel tendons on dams and flood gates. The inspection systems were part of a program for the California Department of Water Resources. The effort included the identification of the location and amount of corrosion damage to the tendons, identification of the cause of corrosion, and the technology for inhibiting corrosion. Several NDE methods for inspecting and quantifying damage to steel reinforced concrete water pipes were investigated and presented to the DWR for their consideration. The additional methods included Ground Penetrating RADAR, Electro- Potential Measurements, Infrared Technology, Pipe Inspection Crawlers (designed to travel inside pipelines and simultaneously report on the pipe condition as viewed by ultrasonic methods and video cameras from within the pipeline.) Reference to consultants hired by LLNL for similar on-site corrosion inspections were given to the DWR. The LLNL research into industries that have products to prevent corrosion resulted in the identification of an Innsbruck, Austria, company. This company claims to have products to permanently protect post- or pre-stressed tendons. The caveat is that the tendon protection system must be installed when the tendons are installed because no retrofit is available. Corrosion mitigation on the steel reinforcements surrounding the concrete was addressed through active and passive cathodic protection schemes. The combination of corrosion and erosion were addressed during consideration for the inspection of water-pump impeller-blades that are used in the three stage, million horsepower, pumping stations at Edmunston.

  18. Statistical inquiry on the reliability of emergency diesel stations in German nuclear power plants

    International Nuclear Information System (INIS)

    1983-01-01

    This statistic inquiry is based on 692 occurrances in 40 diesel stations of 10 German nuclear power plants. Various parameters influencing the failure behaviour of diesel stations were investigated on only significant plant-specific influences and the impact of diesel station circuitry on failure behaviour were established. According to the results of this inquiry, running time, start-up number and increasing operational experience do not apparently influence the failure behaviour of diesel stations. The expected failure probability of diesel stations varies with the different nuclear power plants. Taking into account both start-up and operational failures, (with monthly inspections and running times of up to 2 h), this value is in the range of 1.6 x 10 -2 to 1.7 x 10 -3 per application. Considering failure data of all diesel stations, the failure probability (start-up and operational failures) is 8.1 x 10 -3 per application. On account of the two common-mode failures registered, a common-mode failure probability of 10 -3 was established. The inquiry also showed that non-availability of diesel stations is essentially determined by maintenance intervals. (orig.) [de

  19. Optical fiber inspection system

    Science.gov (United States)

    Moore, Francis W.

    1987-01-01

    A remote optical inspection system including an inspection head. The inspection head has a passageway through which pellets or other objects are passed. A window is provided along the passageway through which light is beamed against the objects being inspected. A plurality of lens assemblies are arranged about the window so that reflected light can be gathered and transferred to a plurality of coherent optical fiber light guides. The light guides transfer the light images to a television or other image transducer which converts the optical images into a representative electronic signal. The electronic signal can then be displayed on a signal viewer such as a television monitor for inspection by a person. A staging means can be used to support the objects for viewing through the window. Routing means can be used to direct inspected objects into appropriate exit passages for accepted or rejected objects. The inspected objects are advantageously fed in a singular manner to the staging means and routing means. The inspection system is advantageously used in an enclosure when toxic or hazardous materials are being inspected.

  20. AECB staff annual assessment of the Bruce B Nuclear Generating Station for the year 1996

    International Nuclear Information System (INIS)

    1997-06-01

    The Atomic Energy Control Board is the independent federal agency that controls all nuclear activities in Canada. A major use of nuclear energy in Canada is electricity production. The AECB assesses every station's performance against legal requirements, including the conditions in the operating licence. Each station is inspected and all aspects of the station's operation and management is reviewed. This report is the AECB staff assessment of reactor safety at the Bruce Nuclear Generating Station B for 1996. It was concluded that Ontario Hydro operated Bruce B safely in 1996. Although the Bruce B plant is safe,it was noted that the number of outages and the number of secondary and tertiary equipment failures during reactor unit upsets increased. Ontario Hydro needs to pay special attention to prevent such a decrease in the safety performance at Bruce B

  1. Regulatory inspection of the egyptian gamma irradiator using a proposed inspection checklist

    International Nuclear Information System (INIS)

    Abdel-Ghani, A.H.

    2000-01-01

    Regulatory inspections are one of the most important elements of a regulatory programme. It shall be performed in all areas of the regulatory responsibility and during all phases of siting, design, construction, commissioning, operation, maintenance and decommissioning of an irradiator facility. The egyptian mega gamma irradiator operating since december 1979 has a Co-60 source of about 400 kilo curies and is used mainly for sterilization of medical supplies and pharmaceuticals and for preservation of some food stuffs. The constructor (Nordion international Inc.) recommended an extensive inspection programme. In accordance with the international and national (2.3) regulations as well as the licensing conditions, the competent authority (NCNSRC) shall perform regulatory inspections both announced and unannounced. In order to facilitate the inspection task and to harmonize the inspection reports a checklist for inspection is proposed which can be used also as an inspection report form

  2. 1100 MW BWR power station

    International Nuclear Information System (INIS)

    Anon.

    1983-01-01

    Now, the start-up test of No. 2 plant in Fukushima No. 2 Nuclear Power Station is smoothly in progress, and the start of its commercial operation is scheduled at the beginning of 1984. Here, the main features of No. 2 plant including piping design are explained. For No. 2 plant, many improving measures were adopted as the base plant of the improvement and standardization project of the Ministry of International Trade and Industry, such as the adoption of Mark-2 improved PCV, the adoption of an intermediate loop in the auxiliary cooling system, one-body forging of the lower end cover of the reactor pressure vessel, the adoption of many curved pipes, the adoption of large one-body structural components in reactor recirculation system piping and so on, which are related to the reduction of radiation exposure and the improvement of plant reliability in operation and regular inspection. Also, in order to do general adjustment in the arrangement of equipment and piping and in route design, and to establish the rational construction work plan, model engineering was adopted. In No. 2 plant, a remote-controlled automatic and semiautomatic ultrasonic flaw detection system was adopted to reduce radiation exposure in in-service inspection. Automatic welding was adopted to improve the quality. (Kako, I.)

  3. 78 FR 54861 - Inspection, Repair, and Maintenance; Driver-Vehicle Inspection Report

    Science.gov (United States)

    2013-09-06

    ... No. FMCSA-2012-0336] RIN 2126-AB46 Inspection, Repair, and Maintenance; Driver-Vehicle Inspection... Federal Register of August 7, 2013, regarding driver vehicle inspection reports. The corrections involve..., Vehicle and Roadside Operations Division, Office of Bus and Truck Standards and Operations, Federal Motor...

  4. Additive Manufacturing Infrared Inspection

    Science.gov (United States)

    Gaddy, Darrell; Nettles, Mindy

    2015-01-01

    The Additive Manufacturing Infrared Inspection Task started the development of a real-time dimensional inspection technique and digital quality record for the additive manufacturing process using infrared camera imaging and processing techniques. This project will benefit additive manufacturing by providing real-time inspection of internal geometry that is not currently possible and reduce the time and cost of additive manufactured parts with automated real-time dimensional inspections which deletes post-production inspections.

  5. Health products inspection

    International Nuclear Information System (INIS)

    Stoltz, M.

    2009-01-01

    To protect public health, the Health Products Inspection is a public service mission where the application of regulations concerning activities on human health products and cosmetic products is verified. This mission permits a global approach to assess the health products risk-based benefit and, in monitoring by laboratory testing and by on site inspections, to verify their compliance with appropriate regulations. The seventy five inspectors perform about eight hundred inspections per year, in France and abroad. These inspections are related to data provided in the health products assessment and also to manufacturing and delivery practices. The French inspection body is also involved in the training of foreign inspectors and in the harmonization of national, European and international practices either for operators than for the competent authorities. (author)

  6. GOES-K solar panel inspection at Astrotech

    Science.gov (United States)

    1997-01-01

    Space Systems/LORAL employees inspect solar panels for the GOES-K weather satellite in the Astrotech facility at Titusville, Fla., as they begin final testing of the imaging system, communications and power systems of the spacecraft. The GOES-K is the third spacecraft to be launched in the new advanced series of geostationary weather satellites for the National Oceanic and Atmospheric Administration (NOAA). The GOES-K is built for NASA and NOAA by Space Systems/LORAL of Palo Alto, Calif. The launch of the satellite from Launch Pad 36B at Cape Canaveral Air Station on an Atlas 1 rocket (AC-79) is currently planned for Apr. 24 at the opening of a launch window which extends from 1:56 to 3:19 a.m. EDT.

  7. Information-Driven Inspections

    International Nuclear Information System (INIS)

    Laughter, Mark D.; Whitaker, J. Michael; Lockwood, Dunbar

    2010-01-01

    New uranium enrichment capacity is being built worldwide in response to perceived shortfalls in future supply. To meet increasing safeguards responsibilities with limited resources, the nonproliferation community is exploring next-generation concepts to increase the effectiveness and efficiency of safeguards, such as advanced technologies to enable unattended monitoring of nuclear material. These include attribute measurement technologies, data authentication tools, and transmission and security methods. However, there are several conceptual issues with how such data would be used to improve the ability of a safeguards inspectorate such as the International Atomic Energy Agency (IAEA) to reach better safeguards conclusions regarding the activities of a State. The IAEA is pursuing the implementation of information-driven safeguards, whereby all available sources of information are used to make the application of safeguards more effective and efficient. Data from continuous, unattended monitoring systems can be used to optimize on-site inspection scheduling and activities at declared facilities, resulting in fewer, better inspections. Such information-driven inspections are the logical evolution of inspection planning - making use of all available information to enhance scheduled and randomized inspections. Data collection and analysis approaches for unattended monitoring systems can be designed to protect sensitive information while enabling information-driven inspections. A number of such inspections within a predetermined range could reduce inspection frequency while providing an equal or greater level of deterrence against illicit activity, all while meeting operator and technology holder requirements and reducing inspector and operator burden. Three options for using unattended monitoring data to determine an information-driven inspection schedule are to (1) send all unattended monitoring data off-site, which will require advances in data analysis techniques to

  8. INSPECT: a package of computer programs for planning safeguards inspections

    International Nuclear Information System (INIS)

    Wincek, M.A.; Mullen, M.F.

    1979-04-01

    As part of the U.S. program to provide technical assistance to the International Atomic Energy Agency, a package of computer programs was developed for use in planning safeguards inspections of various types of nuclear facilities. The INSPECT software package is a set of five interactive FORTRAN programs which can be used to calculate the variance components of the MUF (Material Unaccounted For) statistic, the variance components of the D (difference) statistic, attribute and variables sampling plans, a measure of the effectiveness of the inspection, and a measurement of the cost of implementing the inspection plan. This report describes the programs and explains how to use them

  9. Development of channel inspection and gauging apparatus for 235 MWe PHWRs

    International Nuclear Information System (INIS)

    Parulkar, S.K.; Taneja, R.; Taliyan, S.S.; Singh, Manjit; Govindarajan, G.

    1992-01-01

    Channel inspection and gauging apparatus is being developed to enable in-service channel inspection and gauging. Phase I apparatus to measure annular gap between pressure tube and calandria tube in a dry channel has been developed. The apparatus consists of a gauging head and a drive mechanism. The gauging head utilities an eddy current probe to measure the annular gap between pressure tube and calandria tube and an ultrasonic sensor to measure the wall thickness of the pressure tube. The output signal of the eddy current probe needs to be corrected for the effect of pressure tube wall thickness variation. This paper gives the details of the above apparatus. The results of calibration tests at mock-up station are presented. The paper outlines the program for the phase-wise development of Channel Inspection and Gauging Apparatus for use in heavy water filled channels without their isolation from PHT and draining. The final apparatus will have the facilities for ultrasonic flaw detection, ultrasonic gauging to measure pressure tube diameter and wall thickness, an inclinometer to measure slope and sag of pressure tube and eddy current probe for the measurement of annular gap between pressure tube and calandria tube. (author). 6 figs

  10. Fuel inspection device

    International Nuclear Information System (INIS)

    Tsuji, Tadashi.

    1990-01-01

    The fuel inspection device of the present invention has a feature of obtaining an optimum illumination upon fuel rod interval inspection operation in a fuel pool. That is, an illumination main body used underwater is connected to a cable which is led out on a floor. A light control device is attached to the other end of the cable and an electric power cable is connected to the light control device. A light source (for example, incandescent lamp) is incorporated in the casing of the illumination main body, and a diffusion plate is disposed at the front to provide a plane light source. The light control device has a light control knob capable of remote-controlling the brightness of the light of the illumination main body. In the fuel inspection device thus constituted, halation is scarcely caused on the image screen upon inspection of fuels by a submerged type television camera to facilitate control upon inspection. Accordingly, efficiency of the fuel inspection can be improved to shorten the operation time. (I.S.)

  11. Inspection of training activities by the NRC's Office of Inspection and Enforcement

    International Nuclear Information System (INIS)

    Ruhlman, W.A.

    1975-01-01

    New requirements in the Code of Federal Regulations, the issuance of new Regulatory Guides and ANSI Standards, have indicated the increased emphasis being placed on training by forces in the Nuclear Industry and the Nuclear Regulatory Commission. A brief description is presented of the functions of the Office of Inspection and Enforcement in the training areas. Three areas are examined: general inspection techniques; training inspection scope; and training inspection bases

  12. OSE inspection of protection program operations field perspective of inspections

    International Nuclear Information System (INIS)

    Brown, R.W.; Martin, H.R.

    1987-01-01

    Protection Program Operations includes three functional areas: Physical Protection Systems, Protective Forces, and System Performance Testing. The Office of Security Evaluations (OSE) inspects field offices in these areas by evaluating programs relative to Standards and Criteria and by performing a variety of exercises and other types of tests to assure protective systems are effective and maintained at a proper level to meet the defined threat. Their perception of the OSE inspections has been positive. The approach taken by ID, with key areas/activities emphasized, during each phase of the field inspection process is described in this report. The most important areas for field offices to concentrate are: inspection preparations through self-evaluation, improving communications, assigning knowledgeable trusted agents, increasing awareness of facility procedures and operations, and assuring daily validations of inspected areas. Emphasis is placed on striving for a balance in reporting both positive and negative findings, and for consistency between ratings and the importance of report findings. OSE efforts to develop improved rating methodologies are encouraged

  13. An example of the practical application of ALARP in planning, implementation and review at BNFL's Bradwell Power Station

    International Nuclear Information System (INIS)

    Devine, I.R.; James, C.

    2000-01-01

    The paper will describe three examples of the practical application of ALARP principles as applied to some major projects associated with enhancement of the safety cases for heat exchanger or reactor core support structures at some Magnox Power Stations operated by BNFL Magnox Generation. It will summarise and discuss some of the issues encountered during the pre-planning, engineering development/implementation, work in progress and post completion review phases. The first example is the response to minor defects discovered during an inspection of a sample of some welds in an upper restraint beam inside the concrete reactor pressure vessel at Oldbury Power Station. These inspections were carried out to enhance the existing safety case to justify a proposed increase in the period between statutory inspections from two to three years. The presence or absence of similar defects in the other welds was not sufficiently well characterised nor could be sufficiently accurately predicted without extensive additional NDT inspection. This would in itself have incurred a significant dose commitment. The engineering/ALARP assessment was required address the justification of the work and even determine what should be proposed. Available options included: extensive inspection to determine the status of load bearing welds to enable a subsequent assessment of the required remedial work (if any) which may include weld dressing, repair or reinforcement; pre-emptive reinforcement on a 'worst case scenario', or pre-emptive complete or partial weld repair. The second and third case studies relate to the response to minor defects in welds associated with support beams inside heat exchangers at Bradwell and Hinkley Point Power Stations. In these cases, pre-emptive repair or reinforcement was clearly justified and optimal. The engineering/ALARP assessments were required to address the optimisation of the required repair or reinforcement strategy and tasks associated with its implementation

  14. Technical regulation of nondestructive inspection

    International Nuclear Information System (INIS)

    1995-01-01

    It starts with the explanation of definition of nondestructive inspection and qualifications for a inspection. It lists the technical regulations of nondestructive inspections which are radiographic testing, ultrasonic flaw detecting test, liquid penetrant test, magnetic particle inspection, eddy current test visual inspection and leakage test.

  15. Brokdorf nuclear power station: Construction scheduling and deadline control

    International Nuclear Information System (INIS)

    Lembcke, U.D.F.

    1986-01-01

    Scheduling, especially deadline control, for all installations of the Brokdorf nuclear power station was carried out centrally by the Project Management of Kraftwerk Union AG. 130 timetables encompassing some 13,000 activities were handled, which were interconnected and linked to 189 timetables (approx. 18,000 activities) from various specialized sections by means of data processing systems. Much space in time scheduling was taken by controls of software processing, especially of the preliminary inspection documents in the piping sector and of working documents for construction management in the control systems area. (orig.) [de

  16. Benchmarking on Inspection Practices. First Triennial Report of the Working Group on Inspection Practices

    International Nuclear Information System (INIS)

    2017-01-01

    The WGIP Nuclear Power Plant (NPP) Observed Inspection Practices Program is intended to promote co-operation and learning among member countries and to collect and provide them with information for improving the effectiveness of existing regulatory inspection practices. This is accomplished by observing how inspections are carried out by other member countries and issuing a WGIP observed inspection report that includes observations (e.g. inspection techniques, obstacles encountered), lessons learnt and potential commendable practices that could be used by a regulatory body. This first triennial report documents the results of a consistency check performed between all six WGIP observed inspection reports and ratifies certain observations, lessons learnt and potential commendable practices identified by WGIP observed inspection participants

  17. Study of the method of placing technical stations

    Directory of Open Access Journals (Sweden)

    Sattorov S.B.

    2017-12-01

    traction arm of the locomotive. When determining the length of the traction arm, the ways of using the locomotive for the duration of working time by one locomotive crew are considered. Practical significance: The rational placement of technical stations according to the proposed methodology will ensure the advancement of trains with the least number of parking lots for the replacement of locomotives, locomotive crews and inspection of rolling stock.

  18. The reliability of ultrasonic inspection and the critical defect size

    International Nuclear Information System (INIS)

    Vasilchenko, G.S.; Bely, V.E.; Ovchinnikov, A.V.; Rivkin, E.Yu.

    1991-01-01

    The ability to detect fabrication and service-induced defects in the welded joints of components and pipelines in nuclear power stations by ultrasonic inspection when this is conducted by using standard instruments and procedures appears to be insufficient. This fact was confirmed by the research carried out in PISC program and other studies. In order to increase the accuracy of measurement and to obtain the additional information on the character of any defect in ultrasonic testing as well as the validity of applying nondestructive testing data to strength calculation, scientific researches have been promoted and carried out in the USSR in a program under the guidance of NPO CNIITMASH. The reliability of the ultrasonic control of welded joints and the ways and means for its improvement are discussed. The presentation of the parameters realized by the ultrasonic inspection of defects in the form of schema for the use in strength calculation is explained. The calculation of stress intensity factor, the estimation of critical defect size, and the estimation of acceptable defect size are reported. (K.I.)

  19. Physical degradation assessment of generator station cables

    International Nuclear Information System (INIS)

    Stonkus, D.J.

    1988-01-01

    Preliminary studies of fossil-fired and nuclear generator station cables indicate that the low voltage PVC insulated cables are in relatively good condition. The insulation is flexible and in the case of nuclear cables can withstand a design basis event after nearly 15 years of service. Cables insulated with styrene butadiene rubber have been found embrittled and cables insulated with SBR should be closely inspected in any plant assurance program. Thermal analysis using oxidative induction technique shows promise to indicate cable insulation degradation. Long term reliability assurance and plant life extension studies are being actively pursued at Ontario Hydro. A major study is currently underway to extend the life of the oldest operating fossil-fuel station, the 8-unit, 2400 MW Lakeview TGS in operation since the 1960s. Plant life assurance programs have been initiated at the 2000 MW Lambton TGS in operation since 1969, and for the oldest operating nuclear plant, Pickering NGS A in operation since the early 1970s. As cables are considered one of the critical components in a generator station due to the extreme difficulty and cost of cable replacement, test programs have been initiated to evaluate the physical degradation of the cables and relate the results to electrical diagnostic tests and to chemical changes. The decommissioning of two small nuclear stations, the 20 MW Nuclear Power Demonstration (NPD) and the 200 MW Douglas Point NGS, which were placed in service in 1962 and 1967 respectively, will provide an opportunity to perform destructive electrical and physical evaluation on field aged cables

  20. Snubber reduction program at the Byron Station, Unit 1

    International Nuclear Information System (INIS)

    Arterburn, J.; Bakhtiari, S.

    1987-01-01

    Commonwealth Edison Company's (CECo's) Byron Station, unit 1, was originally designed with approximately 1200 snubbers supporting the plant's large- and small-bore piping systems. This relatively large number of snubbers is attributed to excessive conservatism in nuclear piping codes and regulations effective during the original piping design. A recent pilot program at CECo's LaSalle County Station, a boiling water reactor plant, demonstrated that a 50% or greater reduction in total snubber population is achievable in plants of this design vintage. Based on the successful results of the pilot program, CECo initiated a full scale snubber reduction program at Byron, a pressurized water reactor plant of the same vintage at the LaSalle County Station. The benefits from a reduced snubber population are described. To realize the maximum potential benefits, all snubbers in the plant were prioritized in order of desirability for removal. The priority designations are discussed. The major results from phase 1 of the Byron program are summarized. The NRC inspection of the project addressed a variety of issues and is discussed. The conclusions that can be drawn from the phase 1 program are summarized

  1. Capacity factor of nuclear power stations in Japan in fiscal year 1984

    International Nuclear Information System (INIS)

    Agawa, Takashi

    1985-01-01

    In Japan presently a total of 28 nuclear power plants are in operation with aggregate capacity 20,561 MW, 22 % of the total power generation. Around 1975 there occurred such as stress corrosion cracking and to repair them much time was consumed, leading to the low capacity factor. With such troubles removed, in fiscal 1984, the capacity factor on average of the nuclear power stations is 73.9 %, the highest so far. Contributing to this are long period of the continuous operation, short period of the periodical inspection and increase in the in-operation capacity factor. Contents are the following : construction state of nuclear power stations, operation state in fiscal 1984, causes leading to the high capacity factor, future directions. (Mori, K.)

  2. Development of FBR visual inspection technique in sodium

    International Nuclear Information System (INIS)

    Suzuki, T.; Nagai, S.; Shioyama, T.; Sato, M.; Karasawa, H.; Maruyama, F.; Ota, S.; Hida, T.; Kai, M.

    1995-01-01

    Because the reactor vessel of Fast Breeder Reactor is filled with opaque liquid sodium, it is expected to develop an acoustic visual inspection technique in sodium. The acoustic 3 dimensional image processing technique and the elemental parts of the visual inspection equipment in sodium have been developed at the first stage of the in-sodium visual inspection technique development. The cross correlation processing has been applied to improve the S/N ratio in the acoustic echo that are deteriorated by wetting in sodium and the low sensitivity that are also deteriorated by rather smaller diameter to integrate the high density multiple acoustic sensors. The improvement of S/N ratio has been realized by the cross correlation between acoustic echo data that is reflected from the objects and M-series continuous wave that is transmitted from the acoustic transducer. The high speed parallel processing circuits, in which DSPs (Digital Signal Processors) are included, have been developed to realize high speed processing by employing (the circuits connected to) each of sensors in parallel. Synthetic Aperture Focussing Technique (SAFT) has been applied to the acoustic 3-dimensional image processing. The amounts of ellipsoids must be drawn into the 3-dimensional memory to compose the 3-dimensional image by SAFT. Then, a high performance work-station has been employed to deal with enormous data to compose the acoustic 3 dimensional image. Motors and cables, which can be operated under the condition of high-temperature and high-radiation environment, have been developed as the parts of the manipulator which will be used for visual inspection equipment in sodium. A prototype drive mechanism consists of the manipulator with three joints and a scanner with an arrayed acoustic sensors which a sweeps in fan-shape mechanically. The manipulatory type prototype drive mechanism and the signal processing device have been developed and tested, and the acoustic 3-dimensional image of pyramid

  3. Seismic aftershock monitoring for on-site inspection purposes. Experience from Integrated Field Exercise 2008.

    Science.gov (United States)

    Labak, P.; Arndt, R.; Villagran, M.

    2009-04-01

    One of the sub-goals of the Integrated Field Experiment in 2008 (IFE08) in Kazakhstan was testing the prototype elements of the Seismic aftershock monitoring system (SAMS) for on-site inspection purposes. The task of the SAMS is to collect the facts, which should help to clarify nature of the triggering event. Therefore the SAMS has to be capable to detect and identify events as small as magnitude -2 in the inspection area size up to 1000 km2. Equipment for 30 mini-arrays and 10 3-component stations represented the field equipment of the SAMS. Each mini-array consisted of a central 3-component seismometer and 3 vertical seismometers at the distance about 100 m from the central seismometer. The mini-arrays covered approximately 80% of surrogate inspection area (IA) on the territory of former Semipalatinsk test site. Most of the stations were installed during the first four days of field operations by the seismic sub-team, which consisted of 10 seismologists. SAMS data center comprised 2 IBM Blade centers and 8 working places for data archiving, detection list production and event analysis. A prototype of SAMS software was tested. Average daily amount of collected raw data was 15-30 GB and increased according to the amount of stations entering operation. Routine manual data screening and data analyses were performed by 2-6 subteam members. Automatic screening was used for selected time intervals. Screening was performed using the Sonoview program in frequency domain and using the Geotool and Hypolines programs for screening in time domain. The screening results were merged into the master event list. The master event list served as a basis of detailed analysis of unclear events and events identified to be potentially in the IA. Detailed analysis of events to be potentially in the IA was performed by the Hypoline and Geotool programs. In addition, the Hyposimplex and Hypocenter programs were also used for localization of events. The results of analysis were integrated

  4. Ultrasonic recording and display techniques for the inspection of nuclear power plant

    International Nuclear Information System (INIS)

    Ely, R.W.; Hall, G.D.; Johnson, A.; Pascoe, P.T.

    1985-01-01

    This paper describes four systems: MDU, PURDIE, LAURA and DRUID, under development as ultrasonic recording and display techniques for the inspection of nuclear power plant. The MDU system plots either plan or sectional views of the component under test onto a bistable storage screen. PURDIE is a system based around a video cassette recorder which has been modified to record ultrasonic A-scan waveforms and probe positional information. MDU and PURDIE are portable systems, for use under difficult site conditions. They may be manufactured in quantity to satisfy the demanding inspection programmes of nuclear power stations. LAURA is a desk top replay system for the video cassette tapes produced on site by PURDIE. DRUID is a digital desk top replay/display system incorporating a high resolution colour graphics terminal and therefore offering more flexibility and improved display formats. The systems are compatible with each other and some component units are directly interchangeable between the various systems

  5. Plant specific safety inspection of German nuclear power plants taking into account the Fukushima-I (Japan) events

    International Nuclear Information System (INIS)

    2011-01-01

    The German Parliament requested (17 March 2011) a comprehensive inspection of German nuclear power plants. For this purpose independent expert commissions should perform a new risk analysis of all German NPPS and nuclear installations with respect to the lessons learned from the Fukushima (Japan) events and other extraordinary damage scenarios. The Reactor safety commission (RSK) was assigned by the German Bundesamt fuer Strahlenschutz to develop a catalogue of requirements for this safety inspection. The contribution summarizes the required inspection volume (status 30.03.2011) including the following events: natural events like earth quakes, floods, weather-based consequences and possible superposition. Additionally the following assumptions have to be considered: event independent postulated common failures or systematic faults, station blackout larger than 2 hours, long-term failure of the auxiliary cooling water supply; aggravating boundary conditions for the performance of emergency measures (non-availability of power supply), hydrogen generation and detonation hazard, restricted personnel availability, non-accessibility due to high radiation levels, impeded technical support from outside. (orig.)

  6. How Agencies Inspect. A Comparative Study of Inspection Policies in Eight Swedish Government Agencies

    International Nuclear Information System (INIS)

    Lindblom, Lars; Clausen, Jonas; Edvardsson, Karin; Hayenhielm, Madeleine; Hermansson, Helene; Nihlen, Jessica; Palm, Elin; Ruden, Christina; Wikman, Per; Hansson, Sven Ove

    2003-04-01

    Eight Swedish authorities with inspection tasks in the areas of health, safety, and environmental protection have been compared, namely the authorities responsible for nuclear safety, radiation protection, railway, marine and aviation safety, environmental protection, chemicals control, and health and safety on workplaces. Significant differences in inspection policies and practices between the authorities were found, such as: diverging definitions of supervision and inspection that complicate comparisons, different priority-setting principles for inspections, variations in inspection frequencies (between 13 and 0.03 inspections per company and year), different practices with respect to notifying companies before inspection visits, and in particular, large differences in the extent to which non-compliance with regulations is reported to legal authorities. It was concluded that these agencies have much to gain from increasing their cooperation in methods development, evaluation studies, and education of inspectors

  7. Incore inspection device

    International Nuclear Information System (INIS)

    Ogisu, Tatsuki; Taguchi, Kosei.

    1995-01-01

    The device of the present invention can inspect surfaces of equipments in reactor water in a nuclear reactor in a state of atmospheric air. Namely, an inspection device is movable forwardly and backwardly in a water-proof vessel. An annular sucker with pleats is disposed to the outer side of a lid of the water-proof vessel. A television camera for an under water monitoring is disposed to the inner side of the lid of the water-proof vessel by way of a partitioning wall with lid. Transferring screws are disposed at the back and on the side of the water-proof vessel. In the device having such a constitution, (1) the inside of the water-proof vessel is at first made water-tight by closing the partitioning wall with lid, (2) the back and the side screws are operated by the guide of the underwater monitoring television camera, to transfer the water-proof vessel to the surface of the reactor core to be inspected, (3) the annular sucker with pleats is urged on the surface to be inspected by the back screw, to fix the water-proof vessel, (4) reactor water in a space of the annular sucker with pleats is discharged and replaced with air, and (5) the lid of the partition wall with lid is opened and the inspection device is disposed at a position of the underwater monitoring television camera, to inspect the surface to be inspected in a state of atmospheric air. (I.S.)

  8. Pressurized water reactor inspection procedures

    International Nuclear Information System (INIS)

    Heinrich, D.; Mueller, G.; Otte, H.J.; Roth, W.

    1998-01-01

    Inspections of the reactor pressure vessels of pressurized water reactors (PWR) so far used to be carried out with different central mast manipulators. For technical reasons, parallel inspections of two manipulators alongside work on the refueling cavity, so as to reduce the time spent on the critical path in a revision outage, are not possible. Efforts made to minimize the inspection time required with one manipulator have been successful, but their effects are limited. Major reductions in inspection time can be achieved only if inspections are run with two manipulators in parallel. The decentralized manipulator built by GEC Alsthom Energie and so far emmployed in boiling water reactors in the USA, Spain, Switzerland and Japan allows two systems to be used in parallel, thus reducing the time required for standard inspection of a pressure vessel from some six days to three days. These savings of approximately three days are made possible without any compromises in terms of positioning by rail-bound systems. During inspection, the reactor refueling cavity is available for other revision work without any restrictions. The manipulator can be used equally well for inspecting standard PWR, PWR with a thermal shield, for inspecting the land between in-core instrumentation nozzles, BWR with and without jet pumps (complementary inspection), and for inspecting core support shrouds. (orig.) [de

  9. Development and operational experiences of an automated remote inspection system for interior of primary containment vessel of a BWR

    International Nuclear Information System (INIS)

    Ozaki, N.; Chikara, S.; Fumio, T.; Katsuhiro, M.; Katsutoshi, S.; Ken-Ichiro, S.; Masaaki, F.; Masayoshi, S.

    1983-01-01

    A prototype was developed for an automated remote inspection system featuring continuous monitoring of the working status of major components inside the primary containment vessel of a boiling water reactor. This inspection system consists of four units, or vehicles, which are towed by a trolley chain along a monorail; a complex coaxial cable for data transmission and for power supply; and an operator's console. A TV camera, microphone, thermometer, hygrometer, and ionization chamber are mounted on the various units. After several months' testing under high-ambient temperature, the system was installed in the Tokai-2 power station of Japan Atomic Power Company for in situ tests

  10. 40 CFR 63.11089 - What requirements must I meet for equipment leak inspections if my facility is a bulk gasoline...

    Science.gov (United States)

    2010-07-01

    ... equipment leak inspections if my facility is a bulk gasoline terminal, bulk plant, pipeline breakout station... gasoline service at the facility. (c) Each detection of a liquid or vapor leak shall be recorded in the log... shall be completed within 15 calendar days after detection of each leak, except as provided in paragraph...

  11. Inspection of small multi-layered plastic tubing during extrusion, using low-energy X-ray beams

    International Nuclear Information System (INIS)

    Armentrout, C.; Basinger, T.; Beyer, J.; Colesa, B.; Olsztyn, P.; Smith, K.; Strandberg, C.; Sullivan, D.; Thomson, J.

    1999-01-01

    The automotive industry uses nylon tubing with a thin ETFE (ethylene-tetrafluroethylene) inner layer to carry fuel from the tank to the engine. This fluorocarbon inner barrier layer is important to reduce the migration of hydrocarbons into the environment. Pilot Industries has developed a series of real-time inspection stations for dimensional measurements and flaw detection during the extrusion of this tubing. These stations are named LERA TM (low-energy radioscopic analysis), use a low energy X-ray source, a special high-resolution image converter and intensifier (ICI) stage, image capture hardware, a personal computer, and software that was specially designed to meet this task. Each LERA TM station operates up to 20 h a day, 6 days a week and nearly every week of the year. The tubing walls are 1-2 mm thick and the outer layer is nylon and the inner 0.2 mm thick layer is ethylene-tetrafluroethylene

  12. Optimisation of maintenance and inspection work in nuclear power plants

    International Nuclear Information System (INIS)

    Meyer, V.

    1996-01-01

    The long-term planning and comparative evaluation of inspection and maintenance intervals as well as results of electric components and machinery have to be intensified in order to shorten maintenance shut-down periods, e.g. of the Grohnde reactor station, thus improving the availability of the plant and the specific electricity generation cost. Economically efficient maintenance has to be based on an efficient organisational structure. Outsourcing of less plant-specific work and tasks offers the possibility for in-house personnel to concentrate on their core competences. All the measures discussed contribute to improving the economic efficiency of the nuclear power plants. (orig./DG) [de

  13. Improvements in the UT Inspection of vessel nozzles. Array application

    International Nuclear Information System (INIS)

    Tanarro, A.; Garcia, A.; Izquierdo, J.

    1998-01-01

    Automatic ultrasonic inspection of certain components in nuclear power plants, together with problems related to access of same, result in other difficulties due to the complexity of their geometry and the apparent orientation of possible defects. Array technology, recently developed on the basis of the theoretical principals of phased array technique, has meant that it is now possible to advance in the characterisation, localisation, and sizing of the defects in these components. This has been possible thanks to the discovery of synthetic materials which have allowed us to design and manufacture a new group of ultrasonic transducers. To these we may add new developments in electronics and computer sciences which have facilitated the building of high-powered control systems. This report discusses the work carried out by Tecnatom and Iberdrola in the field of automatic ultrasonic inspection of the vessel nozzles by means of array technology in the BWR at the Cofrentes Nuclear Power Station. The aims of this work were: - To facilitate the detection, characterisation, sizing and positioning of defects - To simplify and improve ultrasonic inspection in order to reduce acquisition times and the cost of same In order to achieve these results the following items were developed: - New array transducers were designed and manufactured - A new data acquisition system was developed - New programs for analysing data and for simulating ultrasonic testing was developed - The results have been validated in mock up. (Author)

  14. Semi-automated reviewing station for IAEA optical surveillance data

    International Nuclear Information System (INIS)

    Darnell, R.A.; Sonnier, C.S.

    1987-01-01

    A study is underway on the use of computer vision technology to assist in visual inspection of optical surveillance data. The IAEA currently uses optical surveillance as one of its principle Containment and Surveillance (C/S) measures. The review process is a very time-consuming and tedious task, due to the large amount of optical surveillance data to be reviewed. For some time, the IAEA has identified as one of its principle needs an automated optical surveillance data reviewing station that assists the reviewer in identifying activities of safeguards interest, such as the movement of a very large spent fuel cask. The present development reviewing station consists of commercially available digital image processing hardware controlled by a personal computer. The areas under study include change detection, target discrimination, tracking, and classification. Several algorithms are being evaluated in each of these areas using recorded video tape of safeguards relevant scenes. The computer vision techniques and current status of the studies are discussed

  15. From PISC to risk informed inspection

    International Nuclear Information System (INIS)

    Crutzen, S.; Lemaitre, P.; Fabbri, L.

    1998-01-01

    In this paper the correlation between inspection effectiveness, inspection qualification and risk informed inspection will be treated in view of harmonisation of inspection of nuclear plant components. Through the different phases of the PISC programme the necessity has been demonstrated to show the effectiveness of the inspection through a formal process of qualification in order to ensure that a certain level of effectiveness has been reached. Inspection qualification is indeed the way to quantify the capability level of inspection techniques used. The targets to be met by the inspection is information which should be obtained from risk based analyses. (author)

  16. RIMACS, Reactor Inspection Main Control System

    International Nuclear Information System (INIS)

    2008-01-01

    1 - Description of program or function: RIMACS prepares for automatic inspection files on each inspection item for the reactor. These automatic inspection files provide the data to move RIROB (Reactor Inspection Robot) with laser by interpreting the coordinates of LASPO (Laser Positioner) and the laser detecting device of RIROB in three dimensional space. In addition, when RIROB arrives at the inspecting location, the files provide all values of the manipulator's motions to acquire the ultrasonic data. RIMACS provides various modules in order to perform these complex functions, and the functions are programmed on graphic user interface for the convenience of the user. RIMACS provides various functions, such as insertion of reactor production data, selection of the reactor for inspection, the creation of automatic inspection file, the selection of the inspection item, inspection simulation, and automatic inspection procedures. It also provides all other functions, which are necessary for the inspection, such as operating program download and manual control of LASPO and RIROB, the inspection simulation and the inspection status display by means of the graphic screen, and SODAS (ultra-Sonic Data Acquisition System) drive verification. 2 - Methods: Moving path and operation procedures for inspection robot are generated automatically with Kinematics algorithm. 3 - Restrictions on the complexity of the problem: A graphics display with MS-Window capability is required

  17. Technical objectives of inspection

    International Nuclear Information System (INIS)

    Sorenson, R.J.; Stewart, K.B.; Schneider, R.A.

    1976-01-01

    The various technical objectives of inspection are discussed in a very general manner. The discussion includes how the inspection function is related to the assumed threat, the various degrees of assurance and reliance on criteria, and the hierarchy of assurance which is obtained from the various types or levels of inspection

  18. Development and Applicability Demonstration of a Remote Inspection Module for Inspection of Reactor Internals in an SFR

    International Nuclear Information System (INIS)

    Kim, Hoewoong; Joo, Youngsang; Park, Changgyu; Kim, Jongbum; Bae, Jinho

    2014-01-01

    Since liquid sodium is optically opaque, the ultrasonic inspection technique has been mainly employed for inspection of reactor internals in a Sodium-cooled Fast Reactor (SFR). Until now, two types of ultrasonic sensors have been mainly developed; immersion and waveguide sensors. An immersion sensor can provide a high-resolution image, but it may have problems in terms of reliability and life time because the sensor is exposed to high temperature during inspection. On the other hand, a waveguide sensor can maintain its performance during long-term inspection in high temperature because it installs an ultrasonic transducer in a cold region even though such a high-frequency ultrasonic wave cannot be used owing to the long propagation distance [4-6]. In this work, a remote inspection module employing four 10 m long waveguide sensors was newly developed and several performance tests were carried out in water to demonstrate the applicability of the developed remote inspection module to inspection of reactor internals in an SFR. In this work, a remote inspection module for inspection of reactor internals in an SFR was newly developed. The developed remote inspection module employs four 10 m long waveguide sensors for multiple inspection applications: a horizontal beam waveguide sensor for ranging inspection, two vertical beam waveguide sensors for viewing inspection and a 45 .deg. angle beam waveguide sensor for identification inspection. Several performance tests such as ranging, viewing and identification inspections were carried out for simulated nuclear fuel assembly specimens in water, and the applicability of the developed remote inspection module to inspection of reactor internals in an SFR was demonstrated

  19. Development and Applicability Demonstration of a Remote Inspection Module for Inspection of Reactor Internals in an SFR

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Hoewoong; Joo, Youngsang; Park, Changgyu; Kim, Jongbum [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of); Bae, Jinho [National Fusion Research Institute, Daejeon (Korea, Republic of)

    2014-05-15

    Since liquid sodium is optically opaque, the ultrasonic inspection technique has been mainly employed for inspection of reactor internals in a Sodium-cooled Fast Reactor (SFR). Until now, two types of ultrasonic sensors have been mainly developed; immersion and waveguide sensors. An immersion sensor can provide a high-resolution image, but it may have problems in terms of reliability and life time because the sensor is exposed to high temperature during inspection. On the other hand, a waveguide sensor can maintain its performance during long-term inspection in high temperature because it installs an ultrasonic transducer in a cold region even though such a high-frequency ultrasonic wave cannot be used owing to the long propagation distance [4-6]. In this work, a remote inspection module employing four 10 m long waveguide sensors was newly developed and several performance tests were carried out in water to demonstrate the applicability of the developed remote inspection module to inspection of reactor internals in an SFR. In this work, a remote inspection module for inspection of reactor internals in an SFR was newly developed. The developed remote inspection module employs four 10 m long waveguide sensors for multiple inspection applications: a horizontal beam waveguide sensor for ranging inspection, two vertical beam waveguide sensors for viewing inspection and a 45 .deg. angle beam waveguide sensor for identification inspection. Several performance tests such as ranging, viewing and identification inspections were carried out for simulated nuclear fuel assembly specimens in water, and the applicability of the developed remote inspection module to inspection of reactor internals in an SFR was demonstrated.

  20. Tritium in groundwater investigation at the Pickering Nuclear Generating Station

    International Nuclear Information System (INIS)

    DeWilde, J.; Yu, L.; Wootton, R.; Belanger, D.; Hansen, K.; McGurk, E.; Teare, A.

    2001-01-01

    Ontario Power Generation Inc. (OPG) investigated tritium in groundwater at the Pickering Nuclear Generating Station (PNGS). The objectives of the study were to evaluate and define the extent of radionuclides, primarily tritium, in groundwater, investigate the causes or sources of contamination, determine impacts on the natural environment, and provide recommendations to prevent future discharges. This paper provides an overview of the investigations conducted in 1999 and 2000 to identity the extent of the tritium beneath the site and the potential sources of tritium released to the groundwater. The investigation and findings are summarized with a focus on unique aspects of the investigation, on lessons learned and benefits. Some of the investigative techniques discussed include process assessments, video inspections, hydrostatic and tracer tests, Helium 3 analysis for tritium age dating, deuterium and tritium in soil analysis. The investigative techniques have widespread applications to other nuclear generating stations. (author)

  1. Actions at Kashiwazaki Kariwa Nuclear Power Station after the Niigataken Chuetsu-oki earthquake

    International Nuclear Information System (INIS)

    Orita, Shuichi

    2009-01-01

    'The Niigataken Chuetsu-oki Earthquake in 2007' occurred on July 16, 2007, and seismic motions beyond those of the design basis earthquake were recorded at Kashiwazaki Kariwa nuclear power station located near the epicenter. After the earthquake, inspections and seismic response analyses have been being performed to grasp seismic induced impacts on structures, systems and components (SSCs). In addition, re-definition of design basis earthquake, upgrading, management against disasters have been also being conducted. (author)

  2. Inspection Strategies for Concrete Bridges

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard; Thoft-Christensen, Palle

    1989-01-01

    In this paper an optimal inspection strategy for concrete bridges based on periodic routine and detailed inspections is presented. The failure mode considered is corrosion of the reinforcement due to chlorides. A simple modelling of the corrosion and of the inspection strategy is presented....... The optimal inspection strategy is determined from an optimization problem, where the design variables are time intervals between detailed inspections and the concrete cover. The strategy is illustrated on a simple structure, namely a reinforced concrete beam....

  3. 9 CFR 381.76 - Post-mortem inspection, when required; extent; traditional, Streamlined Inspection System (SIS...

    Science.gov (United States)

    2010-01-01

    ...; MANDATORY MEAT AND POULTRY PRODUCTS INSPECTION AND VOLUNTARY INSPECTION AND CERTIFICATION POULTRY PRODUCTS... (NELS) Inspection System, both of which shall be used only for broilers and cornish game hens; the New... Inspection. (i) The SIS shall be used only for broilers and cornish game hens if: (a) The Administrator...

  4. Remote inspection system for components installed inside a primary containment vessel of a boiling water reactor

    International Nuclear Information System (INIS)

    Shimizu, Katsutoshi; Kawai, Katsumi; Ito, Takahiko; Hashimoto, Yuji; Tomizawa, Fumio.

    1983-01-01

    A remote operation type monitoring system was developed to always enable the watching of the condition of the main equipment installed in the containment vessels of BWRs. It comprises four inspection vehicles suspended by a monorail and pulled with trolley chain, coaxial cables for signal transmission and power supply, and control system. On the inspection vehicles, a television camera, a thermometer, a microphone and a radiation dose rate meter are installed. The performance of the system was confirmed at 60 deg C for several months. Thereafter, the field test was carried out in the Tokai No. 2 Power Station, Japan Atomic Power Co., from December, 1980, to September, 1981. By the continuous monitoring and grasp of operational condition, the preventive maintenance and the improvement of the rate of operation can be expected. Also it is desirable in view of the reduction of radiation exposure of operators. The mechanization of and the labor saving in inspection and maintenance works is necessary because skilled workers will be short. The design and the composition of the system and its tests are reported. (Kako, I.)

  5. Inspection of disposal canisters components

    International Nuclear Information System (INIS)

    Pitkaenen, J.

    2013-12-01

    This report presents the inspection techniques of disposal canister components. Manufacturing methods and a description of the defects related to different manufacturing methods are described briefly. The defect types form a basis for the design of non-destructive testing because the defect types, which occur in the inspected components, affect to choice of inspection methods. The canister components are to nodular cast iron insert, steel lid, lid screw, metal gasket, copper tube with integrated or separate bottom, and copper lid. The inspection of copper material is challenging due to the anisotropic properties of the material and local changes in the grain size of the copper material. The cast iron insert has some acoustical material property variation (attenuation, velocity changes, scattering properties), which make the ultrasonic inspection demanding from calibration point of view. Mainly three different methods are used for inspection. Ultrasonic testing technique is used for inspection of volume, eddy current technique, for copper components only, and visual testing technique are used for inspection of the surface and near surface area

  6. Radiation control in the nondestructive inspection

    International Nuclear Information System (INIS)

    Kariya, Yukihiro

    1982-01-01

    In the early days of radiation nondestructive inspection about ten years ago, the loss of radiation sources and careless radiation exposure gave the impression of radiography inspection being immediately slipshod management. In this problem, the peculiar nature of the business in this field is involved. In Nondestructive Inspection Co., Ltd., besides the safety management of radioisotopes, the radiation exposure control of personnel in the regular inspection of nuclear power plants has become increasingly important. The following matters are described: radiation utilization in nondestructive inspection (X- and #betta#-ray radiography, #betta#-ray leak test on shield), radiation control problems in nondestructive inspection business (the peculiar aspects of the business, the analysis of the incidents related with nondestructive inspection), and the practice of radiation control in nondestructive inspection in Nondestructive Inspection Co., Ltd. (Mori, K.)

  7. Estimation of inspection effort

    International Nuclear Information System (INIS)

    Mullen, M.F.; Wincek, M.A.

    1979-06-01

    An overview of IAEA inspection activities is presented, and the problem of evaluating the effectiveness of an inspection is discussed. Two models are described - an effort model and an effectiveness model. The effort model breaks the IAEA's inspection effort into components; the amount of effort required for each component is estimated; and the total effort is determined by summing the effort for each component. The effectiveness model quantifies the effectiveness of inspections in terms of probabilities of detection and quantities of material to be detected, if diverted over a specific period. The method is applied to a 200 metric ton per year low-enriched uranium fuel fabrication facility. A description of the model plant is presented, a safeguards approach is outlined, and sampling plans are calculated. The required inspection effort is estimated and the results are compared to IAEA estimates. Some other applications of the method are discussed briefly. Examples are presented which demonstrate how the method might be useful in formulating guidelines for inspection planning and in establishing technical criteria for safeguards implementation

  8. Bridging of inspection with corrosion management

    International Nuclear Information System (INIS)

    Zamaluddin Ali; Mohd Hawari Hassan; Rohana Jaafar

    2009-01-01

    Formerly, Inspection and Corrosion Engineers have less interaction and sharing of information to each other even they are working in the same plant or organization. Inspection finding either from visual inspection or NDT techniques rarely shared with corrosion engineers. Similarly corrosion engineers rarely discussed their corrosion prediction and potential damage mechanism with inspection engineers. A demanding request of more holistic plant safety and asset integrity promoted the introduction and implementation of Risk Based Inspection (RBI). RBI analysis demands the input mainly from both disciplines i.e. Inspection and Corrosion Engineers. Most of RBI methodologies are once-off analysis approach which also promoted once-off interaction between Inspection and Corrosion Engineers. PETRONAS has developed a methodology with supporting software, integrating both Inspection and Corrosion disciplines. PETRONAS Risk Based Inspection (PRBI) is intended to promote continuous integration of Inspection and Corrosion management of the plant through out the whole life cycle starting from the design stage to fabrication, operation and decommissions stage. (author)

  9. Operating experience and performance at Narora Atomic Power Station

    International Nuclear Information System (INIS)

    Mittal, Subhash; Gupta, J.P.

    1998-01-01

    Narora Atomic Power Station consists of two units of 220 MWe capacity each. These are Pressurized Heavy Water Reactors, fuelled by natural uranium, moderated and cooled by heavy water. The Station is owned by Nuclear Power Corporation of India Ltd., which is responsible for design, construction, commissioning, and operation of all nuclear power stations in the country. NAPS was the first opportunity to apply operating experiences in design, keeping in view the evolving safety and seismicity requirements, ease of maintenance, inservice inspection needs, improved construction ability and standardization. Both the units of NAPS are having improved safety standards of current international levels. All the equipment are indigenous with improved quality and reliability. The first unit of the station went critical in March 1989 and synchronized to the grid in July 1989. The second units followed with its criticality in October 1991 and synchronization in January 1992. Considering the initial stabilizing period, the performance of both units of NAPS has progressively improved over the years. The annual capacity factor for NAPS - 1 was 90.01% and for NAPS - 2 was 89.01% for the financial year 1997-1998. This paper presents an analysis of the performance during the last three years and measures taken to improve it. The stated enhanced performance could be achieved by improvement in human performance by training/re-training, scrupulous monitoring and review of equipment/systems, institution of adequate procedure and ensuring their adherence. (authors)

  10. Gentilly 2 steam generators Spring 2000 outage: tubesheet waterlance cleaning and inspection; upper bundle inspection

    International Nuclear Information System (INIS)

    Akeroyd, J.K.; Plante, S.

    2000-01-01

    A review of the secondary side maintenance activities recently completed during the Gentilly 2 Annual Spring 2000 Maintenance Outage. Activities included: 1) Tubesheet intertube waterlance cleaning and visual inspection, 2) First tube support plate, in-bundle visual inspection of the hot leg, and 3) Upper bundle tube support plate visual inspection. A description of the waterlancing and inspection equipment and setup in the RB at Gentilly 2 is provided. Several innovative techniques were successfully employed and yielded savings in critical path duration, labour and personnel radiation dose. These included accessing the SG tubesheet region through one handhole only and sludge removal utilizing the SG blowdown system. Plant personnel judged tubesheet sludge removal successful. Before and after results of the cleaning process along with samples of the visual inspection results are provided. Inspection of the first support plate, which was a repeat of an inspection done in 1997, was conducted along with an in-bundle inspection of the upper tube supports. Results are presented along with a discussion of the implications for future steam generator maintenance. (author)

  11. Remote-automation of nuclear power plant equipment inspection and maintenance

    International Nuclear Information System (INIS)

    Sasaki, Masayoshi; Kawamura, Hironobu; Nakano, Yoshiyuki; Izumi, Shigeru.

    1984-01-01

    The remotely operated automation of the checkup and maintenance of nuclear power generation facilities has largely contributed to the rise of capacity ratio of plants due to the shortening of regular inspection period and to the reduction of radiation exposure dose during working, the labor saving in working and so on. In this paper, the new technologies adopted in an automatic fuel exchanger, a remotely operated automatic CRD exchanger, a new type channel handling machine, pressure-withstanding main steam line plugs and so on for No.2 plant in the Fukushima No.2 Nuclear Power Station, Tokyo Electric Power Co., Inc., are reported. Besides, the state of development of new remotely operated automatic machines for nuclear power use, such as CRD disassembling and cleaning device, volume reduction equipment for spent fuel channel boxes and control rods, multi-functional robots for use under high radiation and so on is described. Also the trend of development of latest robot technology which will be put in practical use in near future is outlined, such as a running manipulator for checkup and inspection, a variable form crawler vehicle and a five-leg movable manipulator. (Kako, I.)

  12. A study on improvements of inspection efficiency with remote transmission of inspection data

    International Nuclear Information System (INIS)

    Kikuchi, Masahiro

    2010-01-01

    Current information networks technology brought secure and convenient condition of information transmission, so that inspectorates intend to apply such technology to optimize current inspection efforts. IAEA established the Remote Monitoring Project (RMP) in 1996 and started to draft safeguards concepts, and approaches to refer the implementation of remote monitoring technology and to compromise with relationship between current inspection activities and the remote monitoring technologies. Although communications costs and conditions of secured communication should be further investigated, the technologies would have a possibility to reduce current inspection efforts. We would face at the step to study on the several issues such as what measures could be candidate to use, how much cost we needs, what kind of technical risks would be concerned, further improvements could be achieved by comparison with current inspection costs and effectiveness. This paper reports on the expectation points and relevant technical attention points which are related to apply unattended inspection system with remote data transmission to the flows and inventory verification of item and bulk facility, respectively, in order to improve inspection efforts. (author)

  13. Annual report of operation management in nuclear power stations, fiscal year 1985

    International Nuclear Information System (INIS)

    1986-09-01

    Twenty years have elapsed since the first practical nuclear reactor in Japan started the operation. In the generated power in fiscal year 1985, that of nuclear power stations for the first time overtook that of thermal power stations, and now the age of nuclear power as the main and oil power as the subordinate has begun. As of the end of fiscal year 1985, there were 32 nuclear power plants in operation, having total output capacity of 24.521 million kW. In fiscal year 1985, nuclear power plants generated about 159 billion kWh, which is about 26 % of electric power supply. As to the capacity factor, 76 % was attained in fiscal year 1985, and this is ranked in the top group of LWR-operating countries in the world. It showed that the Japanese technology of nuclear power generation is at the top level in the world. However, in order to increase nuclear power generation and to accomplish the role of main electric power source hereafter, it is necessary to further increase the reliability and economical efficiency. The list of nuclear power stations in Japan, the state of operation of nuclear power stations, the state of accidents and troubles, the state of regular inspection, the management of radioactive wastes and the radiation exposure of workers in nuclear power stations, the operational management and others are reported. (Kako, I.)

  14. Study on the inspection item and inspection method of HTGR fuel

    International Nuclear Information System (INIS)

    Na, Sang Ho; Kim, Y. K.; Jeong, K. C.; Oh, S. C.; Cho, M. S.; Kim, Y. M.; Lee, Y. W.

    2006-01-01

    The type of HTGR(High Temperature Gas-cooled Reactor) fuel is different according to the reactor type. Generally the HTGR fuel has two types. One is a block type, which is manufactured in Japan or America. And the other is a pebble type, which is manufactured in China. Regardless of the fuel type, the fuel manufacturing process started from the coated particle, which is consisted of fuel kernel and the 4 coating layers. Korea has a plan to fabricate a HTGR fuel in near future. The appropriate quality inspection standards are requested to produce a sound and reliable coated particle for HTGR fuel. Therefore, the inspection items and the inspection methods of HTGR fuel between Japan and China, which countries have the manufacturing process, are investigated to establish a proper inspection standards of our product characteristics

  15. Burning issue of energy problem after Fukushima disaster of TEPCO's atomic power stations

    International Nuclear Information System (INIS)

    Harada, Shoji

    2012-01-01

    Strikes of unanticipated enormous earthquake and subsequent tsunami brought unbelievable disaster in eastern Japan on March 11, 2012. In particular, collapse of cooling system of TEPCO's Fukushima atomic power stations resulted in IAEA-defined level7 accident including heavy radiation, hydrogen explosion -induced collapse of the building of power station No.2 and No.4 and melt through of nuclear pressure vessel No1.3.4 At an initial stage of the disaster, nobody knew precisely what happened at the power stations. According to the recent report of the national investigation committee, precise reason of the collapse of the cooling system whether it was induced by the strike of huge earthquake or tsunami is still unclear. Due to poor risk management of the government and TEPCO and closure of the precise disaster information, people became suspicious and nervous about the atomic power station. Fifty four atomic power stations have been constructed for these forty years in Japan. On last May 04, all the atomic power stations were shut down due to periodic inspection. However, restart of them became hot discussion. Although atomic power station was regarded as a powerful tool to reduce carbon dioxide several years ago, this situation after March 11 completely changed. In many countries which possess atomic power station, making a road map to develop recyclable energy is a burning issue. It should be noted that German spent about thirty years to declare atomic energy free society. Finally necessity of succession of technology of utilizing atomic power is emphasized. Politics on depending atomic power differs in each country. Therefore, study from Fukushima disaster should be widely used to prevent from unexpected accident of atomic power station.

  16. A Novel Method of Autonomous Inspection for Transmission Line based on Cable Inspection Robot LiDAR Data

    Directory of Open Access Journals (Sweden)

    Xinyan Qin

    2018-02-01

    Full Text Available With the growth of the national economy, there is increasing demand for electricity, which forces transmission line corridors to become structurally complicated and extend to complex environments (e.g., mountains, forests. It is a great challenge to inspect transmission line in these regions. To address these difficulties, a novel method of autonomous inspection for transmission line is proposed based on cable inspection robot (CIR LiDAR data, which mainly includes two steps: preliminary inspection and autonomous inspection. In preliminary inspection, the position and orientation system (POS data is used for original point cloud dividing, ground point filtering, and structured partition. A hierarchical classification strategy is established to identify the classes and positions of the abnormal points. In autonomous inspection, CIR can autonomously reach the specified points through inspection planning. These inspection targets are imaged with PTZ (pan, tilt, zoom cameras by coordinate transformation. The feasibility and effectiveness of the proposed method are verified by test site experiments and actual line experiments, respectively. The proposed method greatly reduces manpower and improves inspection accuracy, providing a theoretical basis for intelligent inspection of transmission lines in the future.

  17. OSE inspections: A different perspective

    International Nuclear Information System (INIS)

    Ware, J.H.

    1987-01-01

    The Office of Security Evaluation (OSE) is a staff activity of the Assistant Secretary for Defense Programs (ASDP) and is responsible for the conduct of an inspection and evaluation program. The OSE Inspection Division conducts assessments of the effectiveness of Department of Energy (DOE) Safeguards and Security policies and protection programs. The inspections are conducted by OSE Inspectors and Support Specialists. Prior to the author's participation in the inspection of the San Francisco Operations Office, a DOE Field Office employee had never played an active role in an OSE Inspection of another field office. This paper discloses his experience as an OSE Inspector

  18. Endoscopic inspection of steam turbines

    International Nuclear Information System (INIS)

    Maliniemi, H.; Muukka, E.

    1990-01-01

    For over ten years, Imatran Voima Oy (IVO) has developed, complementary inspection methods for steam turbine condition monitoring, which can be applied both during operation and shutdown. One important method used periodically during outages is endoscopic inspection. The inspection is based on the method where the internal parts of the turbine is inspected through access borings with endoscope and where the magnified figures of the internal parts is seen on video screen. To improve inspection assurance, an image-processing based pattern recognition method for cracks has been developed for the endoscopic inspection of turbine blades. It is based on the deduction conditions derived from the crack shape. The computer gives an alarm of a crack detection and prints a simulated image of the crack, which is then checked manually

  19. Wireless Roadside Inspection Phase II Tennessee Commercial Mobile Radio Services Pilot Test Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Franzese, Oscar [ORNL; Lascurain, Mary Beth [ORNL; Capps, Gary J [ORNL; Siekmann, Adam [ORNL

    2011-05-01

    The Federal Motor Carrier Safety Administration (FMCSA) Wireless Roadside Inspection (WRI) Program is researching the feasibility and value of electronically assessing truck and bus driver and vehicle safety at least 25 times more often than is possible using only roadside physical inspections. The WRI program is evaluating the potential benefits to both the motor carrier industry and to government. These potential benefits include reduction in accidents, fatalities and injuries on our highways and keeping safe and legal drivers and vehicles moving on the highways. WRI Pilot tests were conducted to prototype, test and demonstrate the feasibility and benefits of electronically collecting safety data message sets from in-service commercial vehicles and performing wireless roadside inspections using three different communication methods. This report summarizes the design, conduct and results of the Tennessee CMRS WRI Pilot Test. The purpose of this Pilot test was to demonstrate the implementation of commercial mobile radio services to electronically request and collect safety data message sets from a limited number of commercial vehicles operating in Tennessee. The results of this test have been used in conjunction with the results of the complimentary pilot tests to support an overall assessment of the feasibility and benefits of WRI in enhancing motor carrier safety (reduction in accidents) due to increased compliance (change in motor carrier and driver behavior) caused by conducting frequent safety inspections electronically, at highway speeds, without delay or need to divert into a weigh station

  20. Packaging supplier inspection guide

    International Nuclear Information System (INIS)

    Stromberg, H.M.; Gregg, R.E.; Kido, C.; Boyle, C.D.

    1991-05-01

    This is document is a guide for conducting quality assurance inspections of transportations packaging suppliers, where suppliers are defined as designers, fabricators, distributors, users, or owners of transportation packaging. This document can be used during an inspection to determine regulatory compliance within the requirements of 10 Code of Federal Regulations, Part 71, Subpart H (10 CFR 71.101--71.135). The guidance described in this document provides a framework for an inspection. It provides the inspector with the flexibility to adapt the methods and concepts presented here to meet the needs of the particular facility being inspected. The guide was developed to ensure a structured and consistent approach for inspections. The method treats each activity at a supplier facility as a separate entity (or functional element), and combines the activities within the framework of an ''inspection tree.'' The method separates each functional element into several areas of performance and then identifies guidelines, based on regulatory requirements, to be used to qualitatively rate each area. This document was developed to serve as a field manual to facilitate the work of inspectors. 1 ref., 1 fig., 5 tabs

  1. Periodic and in-service inspection programs

    International Nuclear Information System (INIS)

    Dinu, M.

    2000-01-01

    Periodic and in-service inspection programs for Cernavoda NPP consists of periodic inspections of CANDU NPP components CSAN N-285.4 and CSAN N-285.4, in-service inspections and repair and modifications general inspection. Periodic inspection program document (PIPD) determines the systems and components subject to inspection, the category of the inspection, techniques, areas and other details.The current status of the inspection programs is presented, including containment , erosion/corrosion, pressure vessel support and snubbers, main steam lines inspection programs. Qualification program in Cernavoda NPP involves equipment qualification in the on-site laboratory, yearly certification, special equipment qualification in the National Institute of Metrology. All procedures are approved by the ISCIR (regulatory body for pressure vessel and lifting equipment) and CNCAN (National Commission on Nuclear Activities Control). Qualification of the personnel is performed according to the ISCIR Technical prescription CR 11/82 for up to 3 year period. Final qualification and licensing is performed by CNCAN

  2. Underwater inspection training in intense radiation field

    International Nuclear Information System (INIS)

    Taniguchi, Ryoichi

    2017-01-01

    Osaka Prefecture University has a large dose cobalt 60 gamma ray source of about 2 PBq, and is engaged in technological training and human resource development. It is assumed that the decommissioning underwater operation of Fukushima Daiichi Nuclear Power Station would be the focus. The university aims at acquisition of the basic of underwater inspection work under radiation environment that is useful for the above purpose, radiation measurement under water, basic training in image measurement, and aims as well to evaluate the damage of imaging equipment due to radiation, and master practical knowledge for the use of inspection equipment under a large dose. In particular, it is valuable to train in the observation of Cherenkov light emitted from a large dose cobalt radiation source in water using a high sensitivity camera. The measurement of radiation dose distribution in water had difficulty in remote measurement due to water shielding effect. Although it took much time before, the method using high sensitivity camera is easy to sequentially perform two-dimensional measurement, and its utility value is large. Its effect on the dose distribution measurement of irregularly shaped sources is great. The contents of training includes the following: radiation source imaging in water, use of a laser rangefinder in water, dose distribution measurement in water and Cherenkov light measurement, judgment of equipment damage due to irradiation, weak radiation measurement, and measurement and decontamination of surface contamination. (A.O.)

  3. Enabling inspection solutions for future mask technologies through the development of massively parallel E-Beam inspection

    Science.gov (United States)

    Malloy, Matt; Thiel, Brad; Bunday, Benjamin D.; Wurm, Stefan; Jindal, Vibhu; Mukhtar, Maseeh; Quoi, Kathy; Kemen, Thomas; Zeidler, Dirk; Eberle, Anna Lena; Garbowski, Tomasz; Dellemann, Gregor; Peters, Jan Hendrik

    2015-09-01

    The new device architectures and materials being introduced for sub-10nm manufacturing, combined with the complexity of multiple patterning and the need for improved hotspot detection strategies, have pushed current wafer inspection technologies to their limits. In parallel, gaps in mask inspection capability are growing as new generations of mask technologies are developed to support these sub-10nm wafer manufacturing requirements. In particular, the challenges associated with nanoimprint and extreme ultraviolet (EUV) mask inspection require new strategies that enable fast inspection at high sensitivity. The tradeoffs between sensitivity and throughput for optical and e-beam inspection are well understood. Optical inspection offers the highest throughput and is the current workhorse of the industry for both wafer and mask inspection. E-beam inspection offers the highest sensitivity but has historically lacked the throughput required for widespread adoption in the manufacturing environment. It is unlikely that continued incremental improvements to either technology will meet tomorrow's requirements, and therefore a new inspection technology approach is required; one that combines the high-throughput performance of optical with the high-sensitivity capabilities of e-beam inspection. To support the industry in meeting these challenges SUNY Poly SEMATECH has evaluated disruptive technologies that can meet the requirements for high volume manufacturing (HVM), for both the wafer fab [1] and the mask shop. Highspeed massively parallel e-beam defect inspection has been identified as the leading candidate for addressing the key gaps limiting today's patterned defect inspection techniques. As of late 2014 SUNY Poly SEMATECH completed a review, system analysis, and proof of concept evaluation of multiple e-beam technologies for defect inspection. A champion approach has been identified based on a multibeam technology from Carl Zeiss. This paper includes a discussion on the

  4. Examination of the association between announced inspections and inspection scores.

    Science.gov (United States)

    Waters, A Blake; VanDerslice, James; Porucznik, Christina A; Kim, Jaewhan; DeLegge, Royal; Durrant, Lynne

    2013-09-01

    In 2010 the Salt Lake Valley Health Department conducted a pilot of an announced inspection program utilizing a randomized assignment of restaurants to an intervention group with announced inspections and a control group that remained on the usual schedule of unannounced inspections. After adjusting for food type, visible kitchen, outside quality assurance, season, and standardized inspector, significant reductions were found in the odds ratios of personal hygiene (adjusted odds ratios [aOR] = 0.11, p = .00) and equipment cleanliness (aOR = 0.19, p = .00) violations. In the models for the control group, none of the odds ratios were statistically different from one, indicating no change in the postintervention time period as compared to the preintervention period.

  5. Overview of the software inspection process

    Energy Technology Data Exchange (ETDEWEB)

    Lane, G.L.; Dabbs, R. [Sandia National Labs., Albuquerque, NM (United States)

    1997-11-01

    This tutorial introduces attendees to the Inspection Process and teaches them how to organize and participate in a software inspection. The tutorial advocates the benefits of inspections and encourages attendees to socialize the inspection process in their organizations.

  6. Fully Employing Software Inspections Data

    Science.gov (United States)

    Shull, Forrest; Feldmann, Raimund L.; Seaman, Carolyn; Regardie, Myrna; Godfrey, Sally

    2009-01-01

    Software inspections provide a proven approach to quality assurance for software products of all kinds, including requirements, design, code, test plans, among others. Common to all inspections is the aim of finding and fixing defects as early as possible, and thereby providing cost savings by minimizing the amount of rework necessary later in the lifecycle. Measurement data, such as the number and type of found defects and the effort spent by the inspection team, provide not only direct feedback about the software product to the project team but are also valuable for process improvement activities. In this paper, we discuss NASA's use of software inspections and the rich set of data that has resulted. In particular, we present results from analysis of inspection data that illustrate the benefits of fully utilizing that data for process improvement at several levels. Examining such data across multiple inspections or projects allows team members to monitor and trigger cross project improvements. Such improvements may focus on the software development processes of the whole organization as well as improvements to the applied inspection process itself.

  7. AECB staff annual assessment of the Pickering A and B Nuclear Generating Stations for the year 1996

    International Nuclear Information System (INIS)

    1997-06-01

    The Atomic Energy Control Board is the independent federal agency that controls all nuclear activities in Canada. A major use of nuclear energy in Canada is electricity production. The AECB assesses every station's performance against legal requirements, including the conditions in the operating licence. Each station is inspected and all aspects of the station's operation and management is reviewed. This report is the AECB staff assessment of reactor safety at the Pickering A and B Generating Stations for 1996. PNGS-A and PNGS-B operated safely during 1996. Although the risk to the workers and the public is low, major safety related changes are necessary at the stations and the sustainability of those changes needs to be demonstrated. Improvement is needed by Ontario Hydro in meeting the time limits for reporting reportable events. Ontario Hydro's follow up to events and causal factor analyses continue to need improvements. Improvements are needed to operational safety and reactor maintenance at both A and B. There are signs of improvement through Ontario Hydro's plan for recovery, and in station management changes. There also appears to be commitment to safety expressed at the highest level of the utility

  8. Piping inspection round robin

    International Nuclear Information System (INIS)

    Heasler, P.G.; Doctor, S.R.

    1996-04-01

    The piping inspection round robin was conducted in 1981 at the Pacific Northwest National Laboratory (PNNL) to quantify the capability of ultrasonics for inservice inspection and to address some aspects of reliability for this type of nondestructive evaluation (NDE). The round robin measured the crack detection capabilities of seven field inspection teams who employed procedures that met or exceeded the 1977 edition through the 1978 addenda of the American Society of Mechanical Engineers (ASME) Section 11 Code requirements. Three different types of materials were employed in the study (cast stainless steel, clad ferritic, and wrought stainless steel), and two different types of flaws were implanted into the specimens (intergranular stress corrosion cracks (IGSCCs) and thermal fatigue cracks (TFCs)). When considering near-side inspection, far-side inspection, and false call rate, the overall performance was found to be best in clad ferritic, less effective in wrought stainless steel and the worst in cast stainless steel. Depth sizing performance showed little correlation with the true crack depths

  9. Quality assurance for IAEA inspection planning

    International Nuclear Information System (INIS)

    Markin, J.T.

    1986-01-01

    Under the provisions of the Treaty on Nonproliferation of Nuclear Weapons and other agreements with states, the International Atomic Energy Agency (IAEA) conducts inspections at nuclear facilities to confirm that their operation is consistent with the peaceful use of nuclear material. The Department of Safeguards at the IAEA is considering a quality assurance program for activities related to the planning of these facility inspections. In this report, we summarize recent work in writing standards for planning inspections at the types of facilities inspected by the IAEA. The standards specify the sequence of steps in planning inspections, which are: (1) administrative functions, such as arrangements for visas and travel, and communications with the state to confirm facility operating schedules and the state's acceptance of the assigned inspectors; (2) technical functions including a specification of the required inspection activities, determination of personnel and equipment resources, and a schedule for implementing the inspection activities at the facility; and (3) management functions, such as pre- and post-inspection briefings, where the planned and implemented inspection activities are reviewed

  10. In-service inspection techniques

    International Nuclear Information System (INIS)

    Backfisch, W.; Zipser, R.R.

    1980-01-01

    The owner of a nuclear power plant (NPP) is obligated and interested to maintain - by regular maintenance and in-service inspections - the operational safety and availability of the plant for the subsequent operating period in a condition, as is specified as the basis of the erection and the last operational permits. In-service inspections are performed to verify the operational safety, and maintenance work is performed to guarantee the availability. Below, the typical in-service inspections of a light-water reactor NPP (operated on a pressurized-water reactor or on a boiling-water reactor) are described with details and examples of typical inspections, especially of recurrent performance tests of the systems. (orig./RW)

  11. Detailed simulation of ultrasonic inspections

    International Nuclear Information System (INIS)

    Chaplin, K.R.; Douglas, S.R.; Dunford, D.

    1997-01-01

    Simulation of ultrasonic inspection of engineering components have been performed at the Chalk River Laboratories of AECL for over 10 years. The computer model, called EWE for Elastic Wave Equations, solves the Elastic Wave Equations using a novel finite difference scheme. It simulates the propagation of an ultrasonic wave from the transducer to a flaw, the scatter of waves from the flaw, and measurement of signals at a receive transducer. Regions of different materials, water and steel for example, can be simulated. In addition, regions with slightly different material properties from the parent material can be investigated. The two major types of output are displays of the ultrasonic waves inside the component and the corresponding A-scans. EPRI and other organizations have used ultrasonic models for: defining acceptable ultrasonic inspection procedures, designing and evaluating inspection techniques, and for quantifying inspection reliability. The EWE model has been applied to the inspection of large pipes in a nuclear plant, gas pipeline welds and steam generator tubes. Most recent work has dealt with the ultrasonic inspection of pressure tubes in CANDU reactors. Pressure tube inspections can reliably detect and size defects; however, there are improvements that can be made. For example, knowing the sharpness of a flaw-tip is crucial for fitness for service assessments. Computer modelling of the ultrasonic inspection of flaws with different root radius has suggested inspection techniques that provide flaw tip radius information. A preliminary investigation of these methods has been made in the laboratory. The basis for the model will be reviewed at the presentation. Then the results of computer simulations will be displayed on a PC using an interactive program that analyzes simulated A-scans. This software tool gives inspection staff direct access to the results of computer simulations. (author)

  12. Comparison of API 510 pressure vessels inspection planning with API 581 risk-based inspection planning approaches

    International Nuclear Information System (INIS)

    Shishesaz, Mohammad Reza; Nazarnezhad Bajestani, Mohammad; Hashemi, Seyed Javad; Shekari, Elahe

    2013-01-01

    To ensure mechanical integrity, all pressure vessels shall be inspected at the intervals provided in inspection codes or based on a risk-based inspection (RBI) assessment. The RBI assessment may allow previously established inspection intervals to be extended. This paper describes the methodology, analysis and results of two RBI studies conducted on 293 pressure vessel components in two crude oil distillation units. Based on API RBI methodology in API 581 (2008), risk target concept was used for determining inspection dates. It was shown that when thinning is the major active damage, the RBI recommended intervals are as long as twice the API 510 intervals. This paper summarizes that, as a fundamental step in the risk calculation, RBI has a more defined methodology for evaluating equipment for multiple damage mechanisms and a more defined approach to specify the use of other inspection technologies beyond the traditional visual, ultrasonic, and radiography tests. -- Highlights: • RBI calculated inspection intervals are as long as twice of API 510 inspection code. • Two case studies verified the advantage of RBI in inspection planning. • RBI is a more reliable methodology when evaluating multiple damage mechanisms. • Damage factor calculations can be used for determining RSFa value in FFS assessments

  13. The MCNP simulation of the X-ray leakage of X-ray security inspection equipment

    International Nuclear Information System (INIS)

    Wang Kai; Liu Bin; Hu Wenchao; Zhao Wei

    2011-01-01

    Objective: To simulate the radiation leakage of the X-ray security inspection equipment used in the subways stations. Methods: We use the MCNP4C code to simulate the X-ray leakage of the equipment during the working process. Result: the biggest amount of radiation received by the body is 8.26 μSv/a, however, if the Lead screens of the X-ray security equipment is intact, the amount of radiation received by the body is only 0.0727 μSv/a. The final. Conclusions: When the baggage get in /out the X-ray security inspection equipment, the gas in Lead screens was made, and then the amount of radiation received by human body increased; The amount of radiation received by the body is close to but still below 10 μSv/a which is the exemption criteria set by the 'safety of radiation sources of ionizing radiation protection and basic standards'(GB18871-2002). (authors)

  14. Evaluation of data from HEPA filter quality assurance testing stations

    International Nuclear Information System (INIS)

    Collins, J.T.; Bellamy, R.R.; Allen, J.R.

    1979-01-01

    In Revision 1 to Regulatory Guide 1.52, issued in July 1976, the NRC recommended that high efficiency particulate air (HEPA) filters for use in engineered safety features (ESF) atmosphere cleanup systems be visually inspected and dioctylphtalate (DOP) tested at either of two Department of Energy (DOE) operated QA Filter Testing Stations prior to their installation and use in commercial nuclear power plants. This practice was initiated because filter vendors were unable to consistently provide a HEPA filter that would meet the stringent requirements established by DOE and NRC and its predecessor the AEC. In 1977, the NRC staff undertook a program to revise Regulatory Guide 1.52 to reflect recently issued industry standards (e.g., ANSI N509 and N510) and current industry practices. Revision 2 to Regulatory Guide 1.52 was formally issued in March 1978. In conducting this review, the recommendation that HEPA filters, intended for use in ESF systems in commercial nuclear power plants, be routinely tested at the DOE-QA Filter Testing Stations was revaluated. As part of this evluation a detailed analysis of the filter test results recorded by the two QA Testing Stations during the period 1971 to 1977 was conducted. This paper summarizes the results of the analysis and explains the rationale for deleting the requirement that all HEPA filters intended for use in ESF systems be tested at the AQ Testing Station

  15. OSE inspection of computer security: Review

    International Nuclear Information System (INIS)

    Jaehne, E.M.

    1987-01-01

    The inspection process within the Department of Energy (DOE) serves the function of analyzing and reporting on the performance of security measures and controls in specific areas at sites throughout DOE. Three aspects of this process are discussed based on experience in computer security: Policy basis of performance inspections; Role and form of standards and criteria in inspections; and Conducting an inspection using the standards and criteria. Inspections are based on DOE and other applicable policy in each area. These policy statements have a compliance orientation in which the paper trail is often more clearly discernible than the security intention. The relationship of policy to performance inspections is discussed. To facilitate bridging the gap between the paper trail and the security intention defined by policy, standards and criteria were developed in each area. The consensus process and structure of the resulting product for computer security are discussed. Standards and criteria are inspection tools that support the site in preparing for an inspection and the inspector in conducting one. They form a systematic approach that facilitates consistency in the analysis and reporting of inspection results. Experience using the computer security standards and criteria is discussed

  16. The interactive on-site inspection system: An information management system to support arms control inspections

    Energy Technology Data Exchange (ETDEWEB)

    DeLand, S.M.; Widney, T.W.; Horak, K.E.; Caudell, R.B.; Grose, E.M.

    1996-12-01

    The increasing use of on-site inspection (OSI) to meet the nation`s obligations with recently signed treaties requires the nation to manage a variety of inspection requirements. This document describes a prototype automated system to assist in the preparation and management of these inspections.

  17. UF{sub 6} cylinder inspections at PGDP

    Energy Technology Data Exchange (ETDEWEB)

    Lamb, G.W.; Whinnery, W.N. [Martin Marietta Energy Systems, Inc., Paducah, KY (United States)

    1991-12-31

    Routine inspections of all UF{sub 6} cylinders at the Paducah Gaseous Diffusion Plant have been mandated by the Department of Energy. A specific UF{sub 6} cylinder inspection procedure for what items to inspect and training for the operators prior to inspection duty are described. The layout of the cylinder yards and the forms used in the inspections are shown. The large number of cylinders (>30,000) to inspect and the schedule for completion on the mandated time table are discussed. Results of the inspections and the actions to correct the deficiencies are explained. Future inspections and movement of cylinders for relocation of certain cylinder yards are defined.

  18. 10 CFR 21.41 - Inspections.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Inspections. 21.41 Section 21.41 Energy NUCLEAR REGULATORY COMMISSION REPORTING OF DEFECTS AND NONCOMPLIANCE Inspections, Records § 21.41 Inspections. Each individual, corporation, partnership, dedicating entity, or other entity subject to the regulations in this part shall...

  19. Northeast Inspection Services, Inc. boresonic inspection system evaluation

    International Nuclear Information System (INIS)

    Nottingham, L.D.; Sabourin, P.F.; Presson, J.H.

    1993-04-01

    Turbine rotor reliability and remaining life assessment are continuing concerns to electric utilities. Over the years, boresonic inspection and evaluation have served as primary components in rotor remaining life assessment. Beginning with an evaluation of TREES by EPRI in 1982, a series of reports that document the detection and sizing capabilities of several boresonic systems have been made available. These studies should provide utilities with a better understanding of system performance and lead to improved reliability when predicting rotor remaining life. In 1990, the procedures followed for evaluating rotor boresonic performance capabilities were changed to transfer a greater portion of the data analysis function to the participating vendor. This change from previous policy was instituted so that the evaluation results would better reflect the ''final answer'' that a vendor would provide in a real rotor inspection and also to reduce the cost of an evaluation. Among the first vendors to participate in the new performance demonstration was Northeast Inspection Services, Inc. (NISI). The tests reported herein were conducted by NISI personnel under the guidelines of the new plan. Details of the new evaluation plan are also presented. Rotor bore blocks containing surface-connected fatigue cracks, embedded glass beads, and embedded radial-axial oriented disks were used in the evaluation. Data were collected during twenty-five independent passes through the blocks. The evaluation consisted of statistical characterization of the detection capabilities, flaw sizing and location accuracy, and repeatability of the inspection system. The results of the evaluation are included in this report

  20. Computerized automated remote inspection system

    International Nuclear Information System (INIS)

    The automated inspection system utilizes a computer to control the location of the ultrasonic transducer, the actual inspection process, the display of the data, and the storage of the data on IBM magnetic tape. This automated inspection equipment provides two major advantages. First, it provides a cost savings, because of the reduced inspection time, made possible by the automation of the data acquisition, processing, and storage equipment. This reduced inspection time is also made possible by a computerized data evaluation aid which speeds data interpretation. In addition, the computer control of the transducer location drive allows the exact duplication of a previously located position or flaw. The second major advantage is that the use of automated inspection equipment also allows a higher-quality inspection, because of the automated data acquisition, processing, and storage. This storage of data, in accurate digital form on IBM magnetic tape, for example, facilitates retrieval for comparison with previous inspection data. The equipment provides a multiplicity of scan data which will provide statistical information on any questionable volume or flaw. An automatic alarm for location of all reportable flaws reduces the probability of operator error. This system has the ability to present data on a cathode ray tube as numerical information, a three-dimensional picture, or ''hard-copy'' sheet. One important advantage of this system is the ability to store large amounts of data in compact magnetic tape reels

  1. Automated Inspection of Aircraft

    Science.gov (United States)

    1998-04-01

    This report summarizes the development of a robotic system designed to assist aircraft inspectors by remotely deploying non-destructive inspection (NDI) sensors and acquiring, processing, and storing inspection data. Carnegie Mellon University studie...

  2. AECL experience in fuel channel inspection

    Energy Technology Data Exchange (ETDEWEB)

    Van Drunen, G. [Atomic Energy of Canada Limited, Chalk River, Ontario (Canada); Gunn, R. [Atomic Energy of Canada Limited, Mississauga, Ontario (Canada); Mayo, W.R. [Atomic Energy of Canada Limited, Chalk River, Ontario (Canada); Scott, D.A. [Atomic Energy of Canada Limited, Mississauga, Ontario (Canada)

    1999-06-01

    Inspection of CANDU fuel channels (FC) is performed to ensure safe and economic reactor operation. CANDU reactor FCs have features that make them a unique non-destructive testing (NDT) challenge. The thin, 4 mm pressure-tube wall means flaws down to about 0.1 mm deep must be reliably detected and characterized. This is one to two orders of magnitude smaller than is usually considered of significant concern for steel piping and pressure vessels. A second unique feature is that inspection sensors must operate in the reactor core--often within 20 cm of highly radioactive fuel. Work on inspection of CANDU reactor FCs at AECL dates back over three decades. In that time, AECL staff have provided equipment and conducted or supervised in-service inspections in about 250 FCs, in addition to over 8000 pre-service FCs. These inspections took place at every existing CANDU reactor except those in India and Romania. Early FC inspections focussed on measurement of changes in dimensions (gauging) resulting from exposure to a combination of neutrons, stress and elevated temperature. Expansion of inspection activities to include volumetric inspection (for flaws) started in the mid-1970s with the discovery of delayed hydride cracking in Pickering 3 and 4 rolled joints. Recognition of other types of flaw mechanisms in the 1980s led to further expansion in both pre-service and in-service inspections. These growing requirements, to meet regulatory as well as economic needs, led to the development of a wide spectrum of inspection technology that now includes tests for hydrogen concentration, structural integrity of core components, flaws, and dimensional change. This paper reviews current CANDU reactor FC inspection requirements. The equipment and techniques developed to satisfy these requirements are also described. The paper concludes with a discussion of work in progress in AECL aimed at providing state-of-the-art FC inspection services. (author)

  3. Operational inspections

    International Nuclear Information System (INIS)

    Bystersky, M.

    1997-01-01

    Special equipment is described, designed for inspection of reactor pressure vessels performed from the inside. Central shaft manipulator ZMM-5 is available for crack detection control using ultrasound and eddy currents, for visual check of surfaces, repair works at the reactor pressure vessel, and hardness measurements. The manipulator consists of the manipulator bridge, a cable container, shaft segments, a control mechanism and auxiliary parts. Eight inspections were performed at the Bohunice nuclear power plant and two at the Paks nuclear power plant. (M.D.)

  4. Experience on inspection at PFPF

    International Nuclear Information System (INIS)

    Aoki, I.; Yamamoto, Y.; Takahashi, Saburo; Ooshima, Hirofumi; Kuniyasu, Kazufusa.

    1993-01-01

    In order to reduce a personal radiation exposure, Plutonium Fuel Production Facility (PFPF) introduced an automated MOX fabrication technology. Safeguards system for the PFPF was designed and installed so as to be compatible with automated process operation as much as possible. Introduction of these system in PFPF made possible to do the inspection measurements with unattended mode and Near Real Time Material Accountancy (NRTA), consequently inspection has been carrying out effectively and efficiently. This paper describes the new Inspection activities as a comparison with old Inspection activities based on our experience. (author)

  5. 7 CFR 927.60 - Inspection and certification.

    Science.gov (United States)

    2010-01-01

    ... WASHINGTON Order Regulating Handling Inspection § 927.60 Inspection and certification. (a) Handlers shall ship only fresh pears inspected by the Federal-State Inspection Service or under a program developed by... 7 Agriculture 8 2010-01-01 2010-01-01 false Inspection and certification. 927.60 Section 927.60...

  6. ROBOTIC TANK INSPECTION END EFFECTOR

    International Nuclear Information System (INIS)

    Rachel Landry

    1999-01-01

    The objective of this contract between Oceaneering Space Systems (OSS) and the Department of Energy (DOE) was to provide a tool for the DOE to inspect the inside tank walls of underground radioactive waste storage tanks in their tank farms. Some of these tanks are suspected to have leaks, but the harsh nature of the environment within the tanks precludes human inspection of tank walls. As a result of these conditions only a few inspection methods can fulfill this task. Of the methods available, OSS chose to pursue Alternating Current Field Measurement (ACFM), because it does not require clean surfaces for inspection, nor any contact with the Surface being inspected, and introduces no extra by-products in the inspection process (no coupling fluids or residues are left behind). The tool produced by OSS is the Robotic Tank Inspection End Effector (RTIEE), which is initially deployed on the tip of the Light Duty Utility Arm (LDUA). The RTEE combines ACFM with a color video camera for both electromagnetic and visual inspection The complete package consists of an end effector, its corresponding electronics and software, and a user's manual to guide the operator through an inspection. The system has both coarse and fine inspection modes and allows the user to catalog defects and suspected areas of leakage in a database for further examination, which may lead to emptying the tank for repair, decommissioning, etc.. The following is an updated report to OSS document OSS-21100-7002, which was submitted in 1995. During the course of the contract, two related sub-tasks arose, the Wall and Coating Thickness Sensor and the Vacuum Scarifying and Sampling Tool Assembly. The first of these sub-tasks was intended to evaluate the corrosion and wall thinning of 55-gallon steel drums. The second was retrieved and characterized the waste material trapped inside the annulus region of the underground tanks on the DOE's tank farms. While these sub-tasks were derived from the original intent

  7. International cooperation in production inspections

    International Nuclear Information System (INIS)

    Limousin, S.

    2009-01-01

    Nuclear pressure equipment, like the reactor pressure vessel or steam generators, are manufactured in many countries all around the world. As only few reactors were built in the 90's, most of the nuclear safety authorities have lost part of their know how in component manufacturing oversight. For these two reasons, vendor inspection is a key area for international cooperation. On the one hand, ASN has bilateral relationships with several countries (USA, Finland, China...) to fulfill specific purposes. On the other hand, ASN participates in international groups like the MDEP ( Multinational Design Evaluation Program). A MDEP working group dedicated to vendor inspection cooperation enables exchanges of informations (inspection program plan, inspection findings...) among the regulators. Join inspections are organized. International cooperation could lead in the long term to an harmonization of regulatory practices. (author)

  8. How to share inspection practices internationally?

    International Nuclear Information System (INIS)

    Zerger, B.

    2009-01-01

    ASN strives to share practices with its foreign counterparts in order to develop and adopt best practice worldwide. With regard to inspection practices, the exchanges are made with AEN, in particular within the context of the Working Group on Inspection Practices (WGIP). As well as being very rewarding, the exchanges sometimes come up against marked differences in terms of inspection organisation and even in the meaning given to the inspections. The WGIP endeavors, however, to make inspection practice recommendations that are as functional and feasible as possible. (author)

  9. Towards formalization of inspection using petrinets

    International Nuclear Information System (INIS)

    Javed, M.; Naeem, M.; Bahadur, F.; Wahab, A.

    2014-01-01

    Achieving better quality software has always been a challenge for software developers. Inspection is one of the most efficient techniques, which ensure the quality of software during its development. To the best of our knowledge, current inspection techniques are not realized by any formal approach. In this paper, we propose an inspection technique, which is not only backed by the formal mathematical semantics of Petri nets, but also supports inspecting concurrent processes. We also use a case study of an agent based distributed processing system to demonstrate the inspection of concurrent processes. (author)

  10. Ultrasonic inspection of inpile tubes

    International Nuclear Information System (INIS)

    Boyd, D.M.; Bossi, H.

    1985-01-01

    The in-service inspection (ISI) of inpile tubes can be performed accurately and safely with a semiautomatic ultrasonic inspection system. The ultrasonic technique uses a set of multiple transducers to detect and size cracks, voids, and laminations radially and circumferentially. Welds are also inspected for defects. The system is designed to inspect stainless steel and Inconel tubes ranging from 53.8 mm (2.12 in.) to 101.6 mm (4 in.) inner diameter with wall thickness on the order of 5 mm. The inspection head contains seven transducers mounted in a surface-following device. Six angle-beam transducers generate shear waves in the tubes. Two of the six are oriented to detect circumferential cracks, and two detect axial cracks. Although each of these four transducers is used in the pulse-echo mode, they are oriented in aligned sets so pitch-catch operation is possible if desired. The remaining angle-beam transducers are angulated to detect flaws that are off axial or circumferential orientation. The seventh transducer is used for longitudinal inspection and detects and sizes laminar-type defects

  11. A survey study about what an exhibition hall of nuclear power station should be

    International Nuclear Information System (INIS)

    Tada, Yasuyuki; Hayashi, Chikio

    2001-01-01

    The exhibition hall of nuclear power station contributes to understand the visitors about organizations or safety systems through displays and explanations without difficulty. In addition to that, there will be some effect that they give informations to other people after the inspection, so the exhibition hall of nuclear power station plays a vital role of public information considering tens of thousands of yearly visitors. According to that, we made inquiries to the visitors and tried to search what it should be, intending to investigate their actual situation of attitudes or needs, and to accurate effectivities of the present displays in the center of explanations about the organization of nuclear power plant. As a result, the opinion that 'I want to know the organization of nuclear power plant' accounts over 60%, differing from other data of research. And also the opinion after the inspection that 'I am satisfied with acquiring knowledge about the organization' accounts nearly 60%, much higher compared with other choices. In view of these facts, the efficiency of the exhibition hall was certified. The visitor's attitudes of nuclear power is more affirmative than public's one. Even though considering the differences of the survey method, there must be a difference from the first. Besides that, we gained a discernment that educational functions is important through researches for other company. (author)

  12. A survey study about what an exhibition hall of nuclear power station should be

    Energy Technology Data Exchange (ETDEWEB)

    Tada, Yasuyuki [Institute of Nuclear Safety System Inc., Mihama, Fukui (Japan); Hayashi, Chikio [Institute of Statistical Methematics, Tokyo (Japan)

    2001-09-01

    The exhibition hall of nuclear power station contributes to understand the visitors about organizations or safety systems through displays and explanations without difficulty. In addition to that, there will be some effect that they give informations to other people after the inspection, so the exhibition hall of nuclear power station plays a vital role of public information considering tens of thousands of yearly visitors. According to that, we made inquiries to the visitors and tried to search what it should be, intending to investigate their actual situation of attitudes or needs, and to accurate effectivities of the present displays in the center of explanations about the organization of nuclear power plant. As a result, the opinion that 'I want to know the organization of nuclear power plant' accounts over 60%, differing from other data of research. And also the opinion after the inspection that 'I am satisfied with acquiring knowledge about the organization' accounts nearly 60%, much higher compared with other choices. In view of these facts, the efficiency of the exhibition hall was certified. The visitor's attitudes of nuclear power is more affirmative than public's one. Even though considering the differences of the survey method, there must be a difference from the first. Besides that, we gained a discernment that educational functions is important through researches for other company. (author)

  13. System Enhancements for Mechanical Inspection Processes

    Science.gov (United States)

    Hawkins, Myers IV

    2011-01-01

    Quality inspection of parts is a major component to any project that requires hardware implementation. Keeping track of all of the inspection jobs is essential to having a smooth running process. By using HTML, the programming language ColdFusion, and the MySQL database, I created a web-based job management system for the 170 Mechanical Inspection Group that will replace the Microsoft Access based management system. This will improve the ways inspectors and the people awaiting inspection view and keep track of hardware as it is in the inspection process. In the end, the management system should be able to insert jobs into a queue, place jobs in and out of a bonded state, pre-release bonded jobs, and close out inspection jobs.

  14. Engineering Work Plan for Development of Sludge Pickup Adapter for Fuel Cleanliness Inspections

    International Nuclear Information System (INIS)

    PITNER, A.L.

    2000-01-01

    The plan for developing an adapter to suction up sludge into a calibrated tube for fuel cleanliness inspection activities is described. A primary assessment of fuel cleanliness to be performed after processing through the Primary Cleaning Machine is whether the volume of any remaining canister sludge in or on a fuel assembly exceeds the allowable 14 cm 3 limit. It is anticipated that a general visual inspection of the sludge inventory after fuel assembly separation will usually suffice in making this assessment, but occasions may arise where there is some question as to whether or not the observed quantity of sludge exceeds this limit. Therefore a quantitative method of collecting and measuring the sludge volume is needed for these borderline situations. It is proposed to develop an adapter that fits on the end of the secondary cleaning station vacuum wand that will suction the material from the sludge collection tray into a chamber marked with the limiting volume to permit a direct go/no-go assessment of the sludge quantity

  15. Optimising import phytosanitary inspection

    NARCIS (Netherlands)

    Surkov, I.

    2007-01-01

    Keywords: quarantine pest, plant health policy, optimization, import phytosanitary inspection, ‘reduced checks’, optimal allocation of resources, multinomial logistic regression, the Netherlands World trade is a major vector of spread of quarantine plant pests. Border phytosanitary inspection

  16. Magnetic particle inspection

    Science.gov (United States)

    Sastri, Sankar

    1990-01-01

    The purpose of this experiment is to familiarize the student with magnetic particle inspection and relate it to classification of various defects. Magnetic particle inspection is a method of detecting the presence of cracks, laps, tears, inclusions, and similar discontinuities in ferromagnetic materials such as iron and steel. This method will most clearly show defects that are perpendicular to the magnetic field. The Magnaglo method uses a liquid which is sprayed on the workpiece to be inspected, and the part is magnetized at the same time. The workpiece is then viewed under a black light, and the presence of discontinuity is shown by the formation of a bright indication formed by the magnetic particles over the discontinuity. The equipment and experimental procedures are described.

  17. Operational results in the Onagawa Nuclear Power Station

    International Nuclear Information System (INIS)

    Hasegawa, Kanichi; Kato, Katsuya; Terada, Hideo; Kamata, Takakage; Kaimura, Yoshiharu

    1986-01-01

    In the Onagawa Nuclear Power Station, Unit 1 (BWR type, with electric output 524 MW) started operation in June 1, 1984. The power plant has then continued non-stop operation up to April 2, 1985, thus exhibiting its base load plant. In fiscal 1984, the continuous operation is for 342 days; the capacity factor is about 96.1 %, which is the world's top. During the period, the radioactivity releases to the environment in both liquid and gaseous wastes are below the detection limits. The collective exposure dose for plant personnel is merely 6 man-rem. Subsequently, its 1st periodical inspection was started on April 3, 1985, and finished in July the same year. So, the power plant is now again in operation. (Mori, K.)

  18. Ultrasonic inspections of fuel alignment pins

    International Nuclear Information System (INIS)

    Rathgeb, W.; Schmid, R.

    1994-01-01

    As a remedy to the practical problem of defects in fuel alignment pins made of Inconel X750, an inspection technique has been developed which fully meets the requirements of detecting defects. The newly used fuel alignment pins made of austenite are easy to test and therefore satisfy the necessity of further inspections.For the fuel alignment pins of the upper core structure a safe and fast inspection technique was made available. The inspection sensitivity is high and it is possible to give quantitative directions concerning defect orientation and depth. After the required inspections had been concluded in 1989, a total of 18 inspections were carried out in various national and international nuclear power plants in the following years. During this time more than 6000 fuel alignment pines were examined.For the fuel alignment pins the inspection technique provided could increase the understanding of the defect process. This technique contributed to the development of an adaptive and economical repair strategy. ((orig.))

  19. CTBT on-site inspections

    Science.gov (United States)

    Zucca, J. J.

    2014-05-01

    On-site inspection (OSI) is a critical part of the verification regime for the Comprehensive Nuclear-Test-Ban Treaty (CTBT). The OSI verification regime provides for international inspectors to make a suite of measurements and observations on site at the location of an event of interest. The other critical component of the verification regime is the International Monitoring System (IMS), which is a globally distributed network of monitoring stations. The IMS along with technical monitoring data from CTBT member countries, as appropriate, will be used to trigger an OSI. After the decision is made to carry out an OSI, it is important for the inspectors to deploy to the field site rapidly to be able to detect short-lived phenomena such as the aftershocks that may be observable after an underground nuclear explosion. The inspectors will be on site from weeks to months and will be working with many tens of tons of equipment. Parts of the OSI regime will be tested in a field exercise in the country of Jordan late in 2014. The build-up of the OSI regime has been proceeding steadily since the CTBT was signed in 1996 and is on track to becoming a deterrent to someone considering conducting a nuclear explosion in violation of the Treaty.

  20. PWR vessel inspection performance improvements

    International Nuclear Information System (INIS)

    Blair Fairbrother, D.; Bodson, Francis

    1998-01-01

    A compact robot for ultrasonic inspection of reactor vessels has been developed that reduces setup logistics and schedule time for mandatory code inspections. Rather than installing a large structure to access the entire weld inspection area from its flange attachment, the compact robot examines welds in overlapping patches from a suction cup anchor to the shell wall. The compact robot size allows two robots to be operated in the vessel simultaneously. This significantly reduces the time required to complete the inspection. Experience to date indicates that time for vessel examinations can be reduced to fewer than four days. (author)

  1. Employing innovative techniques to reduce inspection times

    International Nuclear Information System (INIS)

    Heumueller, R.; Guse, G.; Dirauf, F.; Fischer, E.

    1997-01-01

    Shorter inspection periods mean lower revision costs and less tight revision schedules, but must not detract from the quality of inspection findings. This requirement imposes upon the company performing the inspection the need for top achievements both in quality management and in the use of innovative techniques. Flexible equipment systems and inspection techniques adapted to specific purposes are able to reduce inspection times in many inspection jobs. As part of a complete system designed to reduce inspection times, the new Saphir (Siemens Alok Phased Array Integrated Reliable UT-System) inspection equipment system is the core of most of the recent innovations. Being an integrated inspection equipment system, it is able to handle conventional US probes as well as arrays and phased arrays. It is open for further matching to specific inspection and administrative requirements and developments, and it may be incorporated in the network of an integrated system with a database. A technological leap in probe design in the past few years has allowed controllable wave fields to be generated which are in no way inferior to those of conventional probes with fixed angles of incidence. In this way, a number of inspection techniques can be implemented with a single probe. This reduces inspection times, setup and retooling times, and doses. Typical examples already used in practice are the LLT (longitudinal-longitudinal-transverse waves) technique and the integration of inspections for longitudinal and transverse defects in a single run. In the near future, surfaces with complicated curvatures will be inspected by novel modular robot systems consisting of individual modules of linear axes and rotational axes. (orig.) [de

  2. Radiographic inspection. Film replacement with digital detector arrays in aerospace applications

    International Nuclear Information System (INIS)

    Schulte, Frank; Bavendiek, Klaus

    2016-01-01

    The new Digital Radiographic Inspection method replace more and more the conventional Film technique. For DDA (Digital Detector Array) systems it is currently necessary to use automated or semi-automated systems. For CR (Computer Radiography) Systems the conventional Film Systems may be used. For this CR technique operators can use same X-Ray Units (Bunker) and same X-Ray equipment. But on CR technique we have basically the same settings like the Film-based technique. More or less same exposure times and for aerospace application long scanning times for the CR foils. In fact there is no big benefit in capacity or in economical view. Regarding this issue we thought about the option to use a DDA System instead of a Film or CR System to use the current Film Equipment (Bunker, Generator, Tube.) and replace this 1:1 by a manual system. In this time only small detectors with fine pixel pitch was available on the market. With this type of DDA's is was absolutely uneconomical to inspect parts in serial inspection. Therefore a new generation of DDA's were developed, which is able to replace Film or CR System 1:1 with adequate economical properties for specific applications. The new PerkinElmer XRD 1611 Panel has a size of 40 x 40 cm and a pixel pitch of 100 μm. The baseline for the new DDA Panel was the most used X-Ray Film in size 30 x 40 cm. The Pixel Pitch and requirements for Bad Pixel based on the requirements for spatial resolution of the applicable ASTM standards and different customer specifications for castings. With this new DDA System is it possible to inspect small and medium castings in very short time with excellent image quality. The System is able to process images under 1 minute include averaging. Images will be transferred by a specific software tool to an offline reading station where certified Level 2 operator can inspect the images. Images will be archived as 16bit DICONDE File. All relevant images information are included in DICONDE File

  3. Automated PCB Inspection System

    Directory of Open Access Journals (Sweden)

    Syed Usama BUKHARI

    2017-05-01

    Full Text Available Development of an automated PCB inspection system as per the need of industry is a challenging task. In this paper a case study is presented, to exhibit, a proposed system for an immigration process of a manual PCB inspection system to an automated PCB inspection system, with a minimal intervention on the existing production flow, for a leading automotive manufacturing company. A detailed design of the system, based on computer vision followed by testing and analysis was proposed, in order to aid the manufacturer in the process of automation.

  4. Recent Shuttle Post Flight MMOD Inspection Highlights

    Science.gov (United States)

    Hyed, James L.; Christiansen, Eric L.; Lear, Dana M.; Herrin, Jason S.

    2009-01-01

    Post flight inspections on the Space Shuttle Atlantis conducted after the STS-11.5 mission revealed a 0.11 inch (2.8 mm) hole in the outer face sheet of the starboard payload bay door radiator panel #4. The payload bay door radiators in this region are 0.5 inch (12.7 mm) thick aluminum honeycomb with 0.011 in (0.279 mm) thick aluminum face sheets topped with 0.005 in (0.127 mm) silver-Teflon tape. Inner face sheet damage included a 0.267 in (6.78 mm) long through crack with measureable deformation in the area of 0.2 in (5.1 mm). There was also a 0.031 in (0.787 nun) diameter hole in the rear face sheet. A large approximately l in (25 mm) diameter region of honeycomb was also destroyed. Since the radiators are located on the inside of the shuttle payload bay doors which are closed during ascent and reentry, the damage could only have occurred during the on-orbit portion of the mission. During the August 2007 STS-118 mission to the International Space Station, a micro-meteoroid or orbital debris (MMOD) particle impacted and completely penetrated one of shuttle Endeavour's radiator panels and the underlying thermal control system (TCS) blanket, leaving deposits on (but no damage to) the payload bay door. While it is not unusual for shuttle orbiters to be impacted by small MMOD particles, the damage from this impact is larger than any previously seen on the shuttle radiator panels. One of the largest impacts ever observed on a crew module window occurred during the November 2008 STS-126 mission to the International Space Station. Damage to the window was documented by the crew on orbit. Post flight inspection revealed a 0.4 in (10.8 mm) crater in the window pane, with a depth of 0.03 in (0.76 mm). The window pane was replaced due to the damage caused by this impact. Analysis performed on residue contained in dental mold impressions taken of the site indicated that a meteoroid particle produced this large damage site. The post flight inspection after the subsequent

  5. Nuclear Technology. Course 30: Mechanical Inspection. Module 30-6, Protective Coating Inspection.

    Science.gov (United States)

    Espy, John

    This sixth in a series of eight modules for a course titled Mechanical Inspection describes the duties of the nuclear quality assurance/quality control technician that are associated with protective coatings, and the national standards that govern the selection, application, and inspection of protective coatings for the reactor containment…

  6. Evaluating Heuristics for Planning Effective and Efficient Inspections

    Science.gov (United States)

    Shull, Forrest J.; Seaman, Carolyn B.; Diep, Madeline M.; Feldmann, Raimund L.; Godfrey, Sara H.; Regardie, Myrna

    2010-01-01

    A significant body of knowledge concerning software inspection practice indicates that the value of inspections varies widely both within and across organizations. Inspection effectiveness and efficiency can be measured in numerous ways, and may be affected by a variety of factors such as Inspection planning, the type of software, the developing organization, and many others. In the early 1990's, NASA formulated heuristics for inspection planning based on best practices and early NASA inspection data. Over the intervening years, the body of data from NASA inspections has grown. This paper describes a multi-faceted exploratory analysis performed on this · data to elicit lessons learned in general about conducting inspections and to recommend improvements to the existing heuristics. The contributions of our results include support for modifying some of the original inspection heuristics (e.g. Increasing the recommended page rate), evidence that Inspection planners must choose between efficiency and effectiveness, as a good tradeoff between them may not exist, and Identification of small subsets of inspections for which new inspection heuristics are needed. Most Importantly, this work illustrates the value of collecting rich data on software Inspections, and using it to gain insight into, and Improve, inspection practice.

  7. AERCam Autonomy: Intelligent Software Architecture for Robotic Free Flying Nanosatellite Inspection Vehicles

    Science.gov (United States)

    Fredrickson, Steven E.; Duran, Steve G.; Braun, Angela N.; Straube, Timothy M.; Mitchell, Jennifer D.

    2006-01-01

    The NASA Johnson Space Center has developed a nanosatellite-class Free Flyer intended for future external inspection and remote viewing of human spacecraft. The Miniature Autonomous Extravehicular Robotic Camera (Mini AERCam) technology demonstration unit has been integrated into the approximate form and function of a flight system. The spherical Mini AERCam Free Flyer is 7.5 inches in diameter and weighs approximately 10 pounds, yet it incorporates significant additional capabilities compared to the 35-pound, 14-inch diameter AERCam Sprint that flew as a Shuttle flight experiment in 1997. Mini AERCam hosts a full suite of miniaturized avionics, instrumentation, communications, navigation, power, propulsion, and imaging subsystems, including digital video cameras and a high resolution still image camera. The vehicle is designed for either remotely piloted operations or supervised autonomous operations, including automatic stationkeeping, point-to-point maneuvering, and waypoint tracking. The Mini AERCam Free Flyer is accompanied by a sophisticated control station for command and control, as well as a docking system for automated deployment, docking, and recharge at a parent spacecraft. Free Flyer functional testing has been conducted successfully on both an airbearing table and in a six-degree-of-freedom closed-loop orbital simulation with avionics hardware in the loop. Mini AERCam aims to provide beneficial on-orbit views that cannot be obtained from fixed cameras, cameras on robotic manipulators, or cameras carried by crewmembers during extravehicular activities (EVA s). On Shuttle or International Space Station (ISS), for example, Mini AERCam could support external robotic operations by supplying orthogonal views to the intravehicular activity (IVA) robotic operator, supply views of EVA operations to IVA and/or ground crews monitoring the EVA, and carry out independent visual inspections of areas of interest around the spacecraft. To enable these future benefits

  8. INSPECT: a package of computer programs for planning and evaluating safeguards inspections

    International Nuclear Information System (INIS)

    Mullen, M.F.

    1980-01-01

    As part of the US Program of Technical Assistance to IAEA Safeguards, PNL has developed a package of computer programs, called INSPECT, that can be used in planning and evaluating safeguards inspections of various types of nuclear facilities. The programs are based on the statistical methods described in Part F of the IAEA Safeguards Technical Manual and can be used to calculate the variance components of the MUF (Material Unaccounted For) statistic, the variance components of the D (difference) statistic, attribute and variables sampling plans, and a measure of the effectiveness of the inspection plan. The paper describes the programs, reviews a number of applications, and indicates areas for future work

  9. Reliability-Based Inspection Planning for Structural Systems

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard

    1993-01-01

    A general model for reliability-based optimal inspection and repair strategies for structural systems is described. The total expected costs in the design lifetime is minimized with the number of inspections, the inspection times and efforts as decision variables. The equivalence of this model...... with a preposterior analysis from statistical decision theory is discussed. It is described how information obtained by an inspection can be used in a repair decision. Stochastic models for inspection, measurement and repair actions are presented. The general model is applied for inspection and repair planning...

  10. New Swedish regulations in the area of plant inspection and in-service inspection

    International Nuclear Information System (INIS)

    Hansson, B.

    1998-01-01

    History and present status od Swedish regulations in the field of NPP inspection and in-service inspection are described. The presentation focuses on the development of regulations and establishing new ones. A description of different organisations involved is included

  11. 9 CFR 381.67 - Young chicken and squab slaughter inspection rate maximums under traditional inspection procedure.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Young chicken and squab slaughter... INSPECTION REGULATIONS Operating Procedures § 381.67 Young chicken and squab slaughter inspection rate... inspector per minute under the traditional inspection procedure for the different young chicken and squab...

  12. 7 CFR 57.925 - Inspection of imported eggs.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Inspection of imported eggs. 57.925 Section 57.925... AGRICULTURAL MARKETING ACT OF 1946 AND THE EGG PRODUCTS INSPECTION ACT (CONTINUED) INSPECTION OF EGGS (EGG PRODUCTS INSPECTION ACT) Regulations Governing the Inspection of Eggs Imports § 57.925 Inspection of...

  13. 46 CFR 107.211 - Original Certificate of Inspection.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Original Certificate of Inspection. 107.211 Section 107... INSPECTION AND CERTIFICATION Inspection and Certification § 107.211 Original Certificate of Inspection. (a) The owner or builder of a unit applies for an inspection for an original Certificate of Inspection by...

  14. 9 CFR 381.309 - Finished product inspection.

    Science.gov (United States)

    2010-01-01

    ... Section 381.309 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE AGENCY ORGANIZATION AND TERMINOLOGY; MANDATORY MEAT AND POULTRY PRODUCTS INSPECTION AND VOLUNTARY INSPECTION AND CERTIFICATION POULTRY PRODUCTS INSPECTION REGULATIONS Canning and Canned Products § 381.309...

  15. Inspection system performance test procedure

    International Nuclear Information System (INIS)

    Jensen, C.E.

    1995-01-01

    This procedure establishes requirements to administer a performance demonstration test. The test is to demonstrate that the double-shell tank inspection system (DSTIS) supplied by the contractor performs in accordance with the WHC-S-4108, Double-Shell Tank Ultrasonic Inspection Performance Specification, Rev. 2-A, January, 1995. The inspection system is intended to provide ultrasonic (UT) and visual data to determine integrity of the Westinghouse Hanford Company (WHC) site underground waste tanks. The robotic inspection system consists of the following major sub-systems (modules) and components: Mobile control center; Deployment module; Cable management assembly; Robot mechanism; Ultrasonic testing system; Visual testing system; Pneumatic system; Electrical system; and Control system

  16. Annual report on operational management of nuclear power stations, 1979-1980

    International Nuclear Information System (INIS)

    1981-04-01

    This report was compiled by the Agency of Natural Resoures and Energy. The commercial nuclear power stations in Japan started the operation in 1966 for the first time, and as of the end of March, 1981, 22 plants with more than 15.5 million kW capacity were in operation. Nuclear power generation is regarded as the top-rated substitute energy for petroleum, and the target of its development in 1990 is about 52 million kW. The government and the people are exerting utmost efforts to attain the target. The result of the rate of operation of nuclear power stations reached 60.8% in 1980, but it is important to maintain the good, stable state of operation by perfecting the operational management hereafter in order to establish the position of LWRs. At present, the operational management officers of the government stay in nationwide power stations, and supervise the state of operations, thus the system of operational management was strengthened after the Three Mile Island accident in the U.S., and the improvement in the rate of operation is expected. A table shows the nuclear power stations in operation and under construction. The state of operations of individual nuclear power plants in 1979 and 1980, the accidents and failures occurred in nuclear power plants from 1966 to 1980, the minor troubles, the conditions in the regular inspections of individual nuclear power plants, radioactive waste management and the radiation exposure of workers are reported. (Kako, I.)

  17. Robotic inspection technology-process an toolbox

    Energy Technology Data Exchange (ETDEWEB)

    Hermes, Markus [ROSEN Group (United States). R and D Dept.

    2005-07-01

    Pipeline deterioration grows progressively with ultimate aging of pipeline systems (on-plot and cross country). This includes both, very localized corrosion as well as increasing failure probability due to fatigue cracking. Limiting regular inspecting activities to the 'scrapable' part of the pipelines only, will ultimately result into a pipeline system with questionable integrity. The confidence level in the integrity of these systems will drop below acceptance levels. Inspection of presently un-inspectable sections of the pipeline system becomes a must. This paper provides information on ROSEN's progress on the 'robotic inspection technology' project. The robotic inspection concept developed by ROSEN is based on a modular toolbox principle. This is mandatory. A universal 'all purpose' robot would not be reliable and efficient in resolving the postulated inspection task. A preparatory Quality Function Deployment (QFD) analysis is performed prior to the decision about the adequate robotic solution. This enhances the serviceability and efficiency of the provided technology. The word 'robotic' can be understood in its full meaning of Recognition - Strategy - Motion - Control. Cooperation of different individual systems with an established communication, e.g. utilizing Bluetooth technology, support the robustness of the ROSEN robotic inspection approach. Beside the navigation strategy, the inspection strategy is also part of the QFD process. Multiple inspection technologies combined on a single carrier or distributed across interacting container must be selected with a clear vision of the particular goal. (author)

  18. Inspections - a cost effective approach

    International Nuclear Information System (INIS)

    Joseph, C.

    1981-01-01

    This paper describes a cost effective approach for inspections of Computerized Nuclear Materials Control and Accounting Systems (CNMCAS). Highlighted is the capability to conduct an inspection program via portable telephone terminals from off-site locations. The program can be applied to various materials management functions including materials control, quality assurance, and materials accounting. The system is designed to facilitate inspections by both external and internal groups

  19. Can non-destructive inspection be reliable

    International Nuclear Information System (INIS)

    Silk, M.G.; Stoneham, A.M.; Temple, J.A.G.

    1988-01-01

    The paper on inspection is based on the book ''The reliability of non-destructive inspection: assessing the assessment of structures under stress'' by the present authors (published by Adam Hilger 1987). Emphasis is placed on the reliability of inspection and whether cracks in welds or flaws in components can be detected. The need for non-destructive testing and the historical attitudes to non-destructive testing are outlined, along with the case of failure. Factors influencing reliable inspection are discussed, and defect detection trials involving round robin tests are described. The development of reliable inspection techniques and the costs of reliability and unreliability are also examined. (U.K.)

  20. Development of radioactive materials inspection system

    International Nuclear Information System (INIS)

    Yang Lu; Wang Guobao; Chen Yuhua; Li Latu; Zhang Sujing

    2005-01-01

    Radioactive materials inspection system which is applied to inspect the horror activities of radioactive materials and its illegal transfer. The detector sections are made of highly stable and credible material. It has high sensitivity to radioactive materials. The inspect lowest limit of inspection is the 2-3 times to the background, the energy range is 30 keV-2.5 MeV and the response time is 0.5 s. Inspection message can be transmitted through wired or wireless web to implement remote control. The structure of the system is small, light and convenient. It is ideal for protecting society and public from the harm of the radiation. (authors)

  1. Lean Construction Applications for Bridge Inspection

    Science.gov (United States)

    2017-10-01

    Lean philosophy was used to analyze the efficiency of bridge inspection. Emphasis was put on identifying activities that add value to the final output, an owner approved bridge inspection report. 26 bridge inspections were shadowed. Time spent on bri...

  2. 9 CFR 318.309 - Finished product inspection.

    Science.gov (United States)

    2010-01-01

    ... Section 318.309 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE AGENCY ORGANIZATION AND TERMINOLOGY; MANDATORY MEAT AND POULTRY PRODUCTS INSPECTION AND VOLUNTARY... Canning and Canned Products § 318.309 Finished product inspection. (a) Finished product inspections must...

  3. Development of inspection robots for bridge cables.

    Science.gov (United States)

    Yun, Hae-Bum; Kim, Se-Hoon; Wu, Liuliu; Lee, Jong-Jae

    2013-01-01

    This paper presents the bridge cable inspection robot developed in Korea. Two types of the cable inspection robots were developed for cable-suspension bridges and cable-stayed bridge. The design of the robot system and performance of the NDT techniques associated with the cable inspection robot are discussed. A review on recent advances in emerging robot-based inspection technologies for bridge cables and current bridge cable inspection methods is also presented.

  4. Runway Inspection by RPAS

    Directory of Open Access Journals (Sweden)

    Stanislav Absolon

    2015-10-01

    Full Text Available This article discusses the use of the RPAS for the inspection of the airport operating areas. The paper compares the current process of the inspection of the airport operating areas by the airport staff with the possibilities which are offered by the use of the modern technology RPAS. The following text also describes how to inspect airport operating areas by the RPAS, specific technical possibilities and the applicable technical solutions. Furthermore there are variants of piloting the RPAS, comparing usable equipment, equipment for video recording and the possibility of using thermal imaging camera in the article.

  5. Non-destructive inservice inspections

    International Nuclear Information System (INIS)

    Kauppinen, P.; Sarkimo, M.; Lahdenperae, K.

    1998-01-01

    In order to assess the possible damages occurring in the components and structures of operating nuclear power plants during service the main components and structures are periodically inspected by non-destructive testing techniques. The reliability of non-destructive testing techniques applied in these inservice inspections is of major importance because the decisions concerning the needs for repair of components are mainly based on the results of inspections. One of the targets of this research program has been to improve the reliability of non-destructive testing. This has been addressed in the sub-projects which are briefly summarised here. (author)

  6. VANTAGE 5 PWR fuel assembly demonstration program at Virgil C. Summer nuclear station

    International Nuclear Information System (INIS)

    Warner, D.C.; Orr, W.L.

    1985-01-01

    VANTAGE 5 is an improved PWR fuel product designed and manufactured by Westinghouse Electric Corporation. The VANTAGE 5 fuel design features integral fuel burnable absorbers, intermediate flow mixer grids, axial blankets, high burnup capability, and a reconstitutable top nozzle. A demonstration program for this fuel design commenced in late 1984 in cycle 2 of the Virgil C. Summer Nuclear Station. Objectives for VANTAGE 5 fuel are reduced fuel cycle costs, better core operating margins, and increased design and operating flexibility. Inspections of the VANTAGE 5 demonstration assemblies are planned at each refueling outage

  7. 9 CFR 355.7 - Inauguration of inspection.

    Science.gov (United States)

    2010-01-01

    ... INSPECTION AND CERTIFICATION CERTIFIED PRODUCTS FOR DOGS, CATS, AND OTHER CARNIVORA; INSPECTION... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Inauguration of inspection. 355.7 Section 355.7 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE...

  8. Developing the information management system for safeguards national inspection

    International Nuclear Information System (INIS)

    Park, S. J.; Jeon, I.; Park, W. S.; Min, K. S.

    2003-01-01

    The inspection information management system for safeguards national inspection is aimed to do the national safeguards inspection with efficiency, and to decrease the inspector's load to write inspection report by systematizing the inspection jobs and sharing the inspection data. National safeguards inspection is consisted two large jobs. The first is the national safeguards supporting job of managing to support the national inspection mission. The other is the writing a national inspection report after completing the national inspection. Before the developing of inspection information management system, the official tools(spread sheet, word processor) are usually used. But there is problem to share the data, to produce the statistics data. To solve the these problem, we developed the inspection information management system that process the job from initial to final inspection work, and opened user education. This paper explain the procedure of developing the inspection information management system for safeguards national inspection

  9. In-service inspection of pressurized water reactors

    International Nuclear Information System (INIS)

    Rapin, M.; Saglio, R.

    1983-01-01

    French legislation, which is more demanding than in other countries, had led Electricite de France, the State-owned utility, to acquire better performance in-service inspection facilities than those which existed previously. This fact has spurred the industrial development of the new technical facilities which are used worldwide today. This article presents the ''in-service inspection machine'' (MIS) for the inspection of the welds of a PWR vessel, and the inspection device of steam generator tubes; the MIS allow a remote-viewing, ultrasonic and gamma-graphic inspection; Foucault currents are the only one method adapted to the inspection steam generator tubes [fr

  10. A locomotive inspection robot for turbine building interior inspection in nuclear power plants

    International Nuclear Information System (INIS)

    Obama, M.; Ozaki, F.; Asano, K.

    1985-01-01

    A locomotive inspection robot, named Turbine Building Inspection System (TBIS), has been developed for turbine building interior inspections in nuclear power plants. This robot is made up of a vehicle, a telescopic support, turning head and a multijoint arm which has dual TV cameras and a diagnostic rod on its tip. The multijoint arm has 17 degrees of freedom and its length is 243 cm. Minimum and maximum heights for the multijoint arm shoulder are 1.5 meter and 4 meters respectively. The total degree of freedom in the combination of the multijoint arm, turning head and telescopic support is 19 and the area, it is capable of inspecting, is equal to the cylindrical dome whose height and diameter are 6.4 meters and 4.8 meters respectively. The design philosophy, hardware structure and operation method of the TBIS are described. 2 refs.; 10 figs

  11. Wafer plane inspection for advanced reticle defects

    Science.gov (United States)

    Nagpal, Rajesh; Ghadiali, Firoz; Kim, Jun; Huang, Tracy; Pang, Song

    2008-05-01

    Readiness of new mask defect inspection technology is one of the key enablers for insertion & transition of the next generation technology from development into production. High volume production in mask shops and wafer fabs demands a reticle inspection system with superior sensitivity complemented by a low false defect rate to ensure fast turnaround of reticle repair and defect disposition (W. Chou et al 2007). Wafer Plane Inspection (WPI) is a novel approach to mask defect inspection, complementing the high resolution inspection capabilities of the TeraScanHR defect inspection system. WPI is accomplished by using the high resolution mask images to construct a physical mask model (D. Pettibone et al 1999). This mask model is then used to create the mask image in the wafer aerial plane. A threshold model is applied to enhance the inspectability of printing defects. WPI can eliminate the mask restrictions imposed on OPC solutions by inspection tool limitations in the past. Historically, minimum image restrictions were required to avoid nuisance inspection stops and/or subsequent loss of sensitivity to defects. WPI has the potential to eliminate these limitations by moving the mask defect inspections to the wafer plane. This paper outlines Wafer Plane Inspection technology, and explores the application of this technology to advanced reticle inspection. A total of twelve representative critical layers were inspected using WPI die-to-die mode. The results from scanning these advanced reticles have shown that applying WPI with a pixel size of 90nm (WPI P90) captures all the defects of interest (DOI) with low false defect detection rates. In validating CD predictions, the delta CDs from WPI are compared against Aerial Imaging Measurement System (AIMS), where a good correlation is established between WPI and AIMSTM.

  12. An international survey of in-service inspection experience with prestressed concrete pressure vessels and containments for nuclear reactors

    International Nuclear Information System (INIS)

    1982-04-01

    An international survey is presented of experience obtained from the in-service surveillance of prestressed concrete pressure vessels and containments for nuclear reactors. Some information on other prestressed concrete structures is also given. Experience has been gained during the working life of such structures in Western Europe and the USA over the years since 1967. For each country a summary is given of the nuclear programme, national standards and Codes of Practice, and the detailed in-service inspection programme. Reports are then given of the actual experience obtained from the inspection programme and the methods of measurement, examination and reporting employed in each country. A comprehensive bibliography of over 100 references is included. The appendices contain information on nuclear power stations which are operating, under construction or planned worldwide and which employ either prestressed concrete pressure vessels or containments. (U.K.)

  13. Development of Inspection Robots for Bridge Cables

    Directory of Open Access Journals (Sweden)

    Hae-Bum Yun

    2013-01-01

    Full Text Available This paper presents the bridge cable inspection robot developed in Korea. Two types of the cable inspection robots were developed for cable-suspension bridges and cable-stayed bridge. The design of the robot system and performance of the NDT techniques associated with the cable inspection robot are discussed. A review on recent advances in emerging robot-based inspection technologies for bridge cables and current bridge cable inspection methods is also presented.

  14. Developing the information management system for safeguards national inspection

    Energy Technology Data Exchange (ETDEWEB)

    Park, S. J.; Jeon, I.; Park, W. S.; Min, K. S. [KAERI, Taejon (Korea, Republic of)

    2003-10-01

    The inspection information management system for safeguards national inspection is aimed to do the national safeguards inspection with efficiency, and to decrease the inspector's load to write inspection report by systematizing the inspection jobs and sharing the inspection data. National safeguards inspection is consisted two large jobs. The first is the national safeguards supporting job of managing to support the national inspection mission. The other is the writing a national inspection report after completing the national inspection. Before the developing of inspection information management system, the official tools(spread sheet, word processor) are usually used. But there is problem to share the data, to produce the statistics data. To solve the these problem, we developed the inspection information management system that process the job from initial to final inspection work, and opened user education. This paper explain the procedure of developing the inspection information management system for safeguards national inspection.

  15. Thermographic inspection of pipes, tanks, and containment liners

    Energy Technology Data Exchange (ETDEWEB)

    Renshaw, Jeremy B., E-mail: jrenshaw@epri.com; Muthu, Nathan [Electric Power Research Institute, 1300 West WT Harris Blvd., Charlotte, NC 28262 (United States); Lhota, James R.; Shepard, Steven M., E-mail: sshepard@thermalwave.com [Thermal Wave Imaging, 845 Livernois St., Ferndale, MI 48220 (United States)

    2015-03-31

    Nuclear power plants are required to operate at a high level of safety. Recent industry and license renewal commitments aim to further increase safety by requiring the inspection of components that have not traditionally undergone detailed inspected in the past, such as tanks and liners. NEI 09-14 requires the inspection of buried pipes and tanks while containment liner inspections are required as a part of license renewal commitments. Containment liner inspections must inspect the carbon steel liner for defects - such as corrosion - that could threaten the pressure boundary and ideally, should be able to inspect the surrounding concrete for foreign material that could be in contact with the steel liner and potentially initiate corrosion. Such an inspection requires a simultaneous evaluation of two materials with very different material properties. Rapid, yet detailed, inspection results are required due to the massive size of the tanks and containment liners to be inspected. For this reason, thermal NDE methods were evaluated to inspect tank and containment liner mockups with simulated defects. Thermographic Signal Reconstruction (TSR) was utilized to enhance the images and provide detailed information on the sizes and shapes of the observed defects. The results show that thermographic inspection is highly sensitive to the defects of interest and is capable of rapidly inspecting large areas.

  16. 7 CFR 75.21 - Grain sample inspection.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Grain sample inspection. 75.21 Section 75.21... AND CERTIFICATION OF QUALITY OF AGRICULTURAL AND VEGETABLE SEEDS Inspection § 75.21 Grain sample inspection. A sample inspection shall be performed by examining official grain samples received from FGIS to...

  17. 7 CFR 868.44 - New original inspection.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 7 2010-01-01 2010-01-01 false New original inspection. 868.44 Section 868.44... FOR CERTAIN AGRICULTURAL COMMODITIES Regulations Original Inspection Service § 868.44 New original... applicant may request a new original inspection on any previously inspected lot; except that a new original...

  18. 49 CFR 396.13 - Driver inspection.

    Science.gov (United States)

    2010-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION FEDERAL MOTOR CARRIER SAFETY REGULATIONS INSPECTION, REPAIR, AND MAINTENANCE § 396.13 Driver inspection. Before driving a motor vehicle, the driver shall: (a) Be satisfied that the motor vehicle is in safe operating condition; (b) Review the last driver vehicle inspection...

  19. Result of 'clean plant operation tactics' in Onagawa Nuclear Power Station No.1 unit during the first fuel cycle and the first maintenance outage

    International Nuclear Information System (INIS)

    Nukazuka, Hideo; Terada, Hideo; Morikawa, Yoshitake; Tomura, Susumu.

    1986-01-01

    On June 1, 1984, No.1 plant in Onagawa Nuclear Power Station started the commercial operation, and recorded the nonstop operation for 344 days. The parallel off was made on April 3, 1985, and the first regular inspection was carried out. On July 12, 1985, the regular inspection was completed, and thereafter, the second cycle operation has been smoothly continued. Special attention was paid to the measures for reducing radiation exposure, and the attainment of the clean plant was aimed at. As the measures for reducing radiation level, the strengtheining of purifying facilities, the suppression of crud generation, the adoption of low cobalt material and the strengthening of shielding were carried out. For shortening exposure time, the machinery and equipment were improved, paying attention to automation, remote operation and labor saving, and the improvement of reliability, maintainability and inspection. In addition to these design measures, in the construction, operation and regular inspection, the clean plant measures were taken. Very good results were obtained. (Kako, I.)

  20. Do school inspections improve primary school performance?

    OpenAIRE

    Dinand Webbink; Rob Luginbuhl; I. de Wolf

    2007-01-01

    Inspectors from the Dutch Inspectorate of Education inspect primary schools, write inspection reports on each inspected school, and make recommendations as to how each school can improve. We test whether these inspections result in better school performance. Using a fixed-effects model, we find evidence that school inspections do lead to measurably better school performance. Our assessment of school performance is based on the Cito test scores of pupils in their final year of primary school. ...

  1. Travelling type monitoring and inspection device

    International Nuclear Information System (INIS)

    Ito, Takao; Maruki, Hideaki.

    1994-01-01

    The present invention sufficiently ensures video output images even if lenses of a television camera of a monitoring means are degraded to reduce the quantity of transmission light. That is, a light amount control mechanism capable of controlling the quantity of illumination light irradiated from an illumination device at an output level of a sensor of an inspection device main body. A test chart for measuring a luminance which is an output level of the sensor is disposed. During plant operation, the lenses of the television camera undergo influences of radioactivity and are degraded to reduce the quantity of transmission light on every periodical monitoring and inspection using a travelling type monitoring inspection device. In this case, the test chart disposed near the equipment to be monitored and inspected is caught by the television camera to measure a sensor output luminance. Then, the light amount control mechanism of the illumination device is controlled so as to provide a luminance which has been set at an initial stage of the plant inspection. With such procedures, video data of the objective equipment to be monitored and inspected can be obtained at a constant luminance during inspection. (I.S.)

  2. Concrete works in Igata Nuclear Power Station Unit-2

    International Nuclear Information System (INIS)

    Yanase, Hidemasa

    1981-01-01

    The construction of Igata Nuclear Power Station Unit-2 was started in February, 1978, and is scheduled to start the commercial operation in March, 1982. Construction works are to be finished by August, 1981. The buildings of Igata Nuclear Power Station are composed of large cross section concrete for the purpose of shielding and the resistance to earth quakes. In response to this, moderate heat Portland cement has been employed, and in particular, the heat of hydration has been controlled. In this report, also fine and coarse aggregates, admixtures and chemical admixtures, and further, the techniques to improve the quality are described. Concrete preparation plant was installed in the power station site. Fresh concrete was carried with agitator body trucks from the preparation plant to the unloading point, and from there with pump trucks. Placing of concrete was carried out, striving to obtain homogeneous and dense concrete by using rod type vibrators. Further, concrete was placed in low slump (8 - 15 cm) to reduce water per unit volume, and its temperature was also carefully controlled, e.g., cold water (temperature of mixing water was about 10 deg C) was used in summer season (end of June to end of September). As a result, the control target was almost satisfied. As for testing and inspection, visual appearance test was done as well as material testing in compliance with JIS and other standards. (Wakatsuki, Y.)

  3. Magnetic rubber inspection (MRI)

    International Nuclear Information System (INIS)

    Carro, L.

    1997-01-01

    Magnetic Rubber Inspection (MRI) was developed to inspect for small cracks and flaws encountered in high performance aircraft. A formula of very fine magnetic particles immersed in a room temperature curing rubber is catalysed and poured into dams (retainers) on the surface of the part to be inspected. Inducing a magnetic field then causes the particles to be drawn to discontinuities in the component under test. These indicating particles are held to the discontinuity by magnetic attraction, as the rubber cures. The solid rubber cast (Replica) is then removed and examined under a microscope for indicating lines of particle concentrations. 3 refs., 6 figs

  4. 29 CFR 1960.31 - Inspections by OSHA.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Inspections by OSHA. 1960.31 Section 1960.31 Labor... MATTERS Inspection and Abatement § 1960.31 Inspections by OSHA. (a) The Secretary or the Secretary's... scheduled inspections as an integral part of OSHA's evaluation of an agency's safety and health program in...

  5. Container Inspection Utilizing 14 MeV Neutrons

    Science.gov (United States)

    Valkovic, Vladivoj; Sudac, Davorin; Nad, Karlo; Obhodas, Jasmina

    2016-06-01

    A proposal for an autonomous and flexible ship container inspection system is presented. This could be accomplished by the incorporation of an inspection system on various container transportation devices (straddle carriers, yard gentry cranes, automated guided vehicles, trailers). The configuration is terminal specific and it should be defined by the container terminal operator. This enables that no part of the port operational area is used for inspection. The inspection scenario includes container transfer from ship to transportation device with the inspection unit mounted on it. The inspection is performed during actual container movement to the container location. A neutron generator without associated alpha particle detection is used. This allows the use of higher neutron intensities (5 × 109 - 1010 n/s in 4π). The inspected container is stationary in the “inspection position” on the transportation device while the “inspection unit” moves along its side. The following analytical methods will be used simultaneously: neutron radiography, X-ray radiography, neutron activation analysis, (n, γ) and (n,n'γ) reactions, neutron absorption. and scattering, X-ray backscattering. The neutron techniques will utilize “smart collimators” for neutrons and gamma rays, both emitted and detected. The inspected voxel is defined by the intersection of the neutron generator and the detectors solid angles. The container inspection protocol is based on identification of discrepancies between the cargo manifest, elemental “fingerprint” and radiography profiles. In addition, the information on container weight is obtained during the container transport and screening by measuring of density of material in the container.

  6. Automated ultrasonic inspection of nuclear plant components

    International Nuclear Information System (INIS)

    Baron, J.A.; Dolbey, M.P.

    1982-01-01

    For reasons of safety and efficiency, automated systems are used in performing ultrasonic inspection of nuclear components. An automated system designed specifically for the inspection of headers in a nuclear plant is described. In-service inspection results obtained with this system are shown to correlate with pre-service inspection results obtained by manual methods

  7. Maintenance and life assessment of steam generators at Embalse Nuclear Station

    International Nuclear Information System (INIS)

    Luna, P.; Diaz, G.; Sveruga, H.; Sainz, R.

    2006-01-01

    The Embalse Nuclear Generating Station (ENGS) has four vertical I-800 U-tubes Steam Generators (SGs) manufactured by Babcock and Wilcox (B and W). They are one of the most important components from the point of view of safety and cost-related elements for potential life extensions in case of a replacement thereof. A Life Management program has been started covering the entire plant and starting with the Life Assessment (LA) of this component which consists in a systematic way to evaluate aging mechanisms focused on the plant refurbishment and life extension. Because of this, maintenance-based ageing assessment from beginning of operation is analyzed and current LA-frame maintenance and inspections programs are carried out in order to maintain a high availability of the SGs then to enable the planning for the plant life extension. The most important taken actions have been the Eddy Current (EC) In Service Inspection program which performs 100% of the tubes of two SG every 1.5 years started in 1992, the mechanical cleaning by blasting of the internal tube surface, the sludge removal from the secondary side tubesheet, the divider plate replacement, the installation of antivibration bars (AVB's), installation of TSP inspection ports and an exhaustive inspection of the secondary internals as a preliminary result of the Life Assessment started during early 2000. The most relevant aging mechanism up to 2004 was the Flow Accelerated Corrosion (FAC) of U-bend supports and consequent fretting of tubes. The eddy current inspections allowed the fretting degradation to be detected and mitigated by installing AVB's. Currently, efficiency of this mitigating action is being performed by vibration measurements and visual inspections. However, other degradation mechanism that could have origin due to the U-bend FAC like loose part damage (LPD) is being to be analyzed since could be an issue in the future. At present, FAC degradation on the cold leg side and sludge deposition on the

  8. Generator acceptance test and inspection report

    International Nuclear Information System (INIS)

    Johns, B.R.

    1997-01-01

    This Acceptance Test Report(ATR) is the completed testing and inspection of the new portable generator. The testing and inspection is to verify that the generator provided by the vendor meets the requirements of specification WHC-S-0252, Revision 2. Attached is various other documentation to support the inspection and testing

  9. Automated ultrasonic inspection using PULSDAT

    International Nuclear Information System (INIS)

    Naybour, P.J.

    1992-01-01

    PULSDAT (Portable Ultrasonic Data Acquisition Tool) is a system for recording the data from single probe automated ultrasonic inspections. It is one of a range of instruments and software developed by Nuclear Electric to carry out a wide variety of high quality ultrasonic inspections. These vary from simple semi-automated inspections through to multi-probe, highly automated ones. PULSDAT runs under the control of MIPS software, and collects data which is compatible with the GUIDE data display system. PULSDAT is therefore fully compatible with Nuclear Electric's multi-probe inspection systems and utilises all the reliability and quality assurance of the software. It is a rugged, portable system that can be used in areas of difficult access. The paper discusses the benefits of automated inspection and gives an outline of the main features of PULSDAT. Since April 1990 PULSDAT has been used in several applications within Nuclear Electric and this paper presents two examples: the first is a ferritic set-through nozzle and the second is an austenitic fillet weld. (Author)

  10. In-service inspections of V-230 reactor

    International Nuclear Information System (INIS)

    Prepechal, J.

    1984-01-01

    It is stated that despite certain constraints the configuration of the WWER-440 is such that it allows to make in-service inspections on a fully satisfactory scale. Three factors are discussed whose existence is necessary for the implementation of in-service inspections. The program defining the scale of inspections is satisfactory with regard to the safety and reliability of reactor operation. Its further development must result in reducing time consumption and radiation burden of personnel. Regulations for the implementation and evaluation of inspections represent the weakest link in the system of in-service inspections. At present, various organizations are dealing with the said problem within international cooperation. Equipment for in-service inspections of WWER-440 reactors is relatively good. The most important knowledge is summed up gained from the ten pre-service and in-service inspections of reactors of this type made so far. (Z.M.)

  11. Intelligent Automated Nuclear Fuel Pellet Inspection System

    International Nuclear Information System (INIS)

    Keyvan, S.

    1999-01-01

    At the present time, nuclear pellet inspection is performed manually using naked eyes for judgment and decisionmaking on accepting or rejecting pellets. This current practice of pellet inspection is tedious and subject to inconsistencies and error. Furthermore, unnecessary re-fabrication of pellets is costly and the presence of low quality pellets in a fuel assembly is unacceptable. To improve the quality control in nuclear fuel fabrication plants, an automated pellet inspection system based on advanced techniques is needed. Such a system addresses the following concerns of the current manual inspection method: (1) the reliability of inspection due to typical human errors, (2) radiation exposure to the workers, and (3) speed of inspection and its economical impact. The goal of this research is to develop an automated nuclear fuel pellet inspection system which is based on pellet video (photographic) images and uses artificial intelligence techniques

  12. SICOM: On-site inspection systems

    International Nuclear Information System (INIS)

    Serna, J.J.; Quecedo, M.; Fernandez, J.R.

    2002-01-01

    As the irradiation conditions become more demanding for the fuel than in the past, there is a need for surveillance programs to gather in-reactor operating experience. The data obtained in these programs can be used to assess the performance of current fuel designs and the improvements incorporated to the fuel assembly design, the performance of the advanced cladding alloys, etc. In these regards, valuable data is obtained from on-site fuel inspections. These on-site data comprise fuel assembly dimensional data such as length and distortion (tilt, twist and bow) and fuel rod data such as length and oxide thickness. These data have to be reliable and accurate to be useful thus, demanding a high precision inspection equipment. However, the inspection equipment has to be also robust and flexible enough to operate in the plant spent fuel pool and, sometimes, without interfering in the works carried out during a plant outage. To meet these requirements, during the past years ENUSA and TECNATOM have developed two on-site inspection systems. While the first system can perform most of the typical measurements in a stand-alone manner thus, without interfering with the critical path of the reload, the second one reduces the inspection time but requires using the plant capabilities. The paper describes both equipment for fuel on-site inspection, their characteristics and main features. (author)

  13. Phased Array Ultrasonic Inspection of Titanium Forgings

    International Nuclear Information System (INIS)

    Howard, P.; Klaassen, R.; Kurkcu, N.; Barshinger, J.; Chalek, C.; Nieters, E.; Sun, Zongqi; Fromont, F. de

    2007-01-01

    Aerospace forging inspections typically use multiple, subsurface-focused sound beams in combination with digital C-scan image acquisition and display. Traditionally, forging inspections have been implemented using multiple single element, fixed focused transducers. Recent advances in phased array technology have made it possible to perform an equivalent inspection using a single phased array transducer. General Electric has developed a system to perform titanium forging inspection based on medical phased array technology and advanced image processing techniques. The components of that system and system performance for titanium inspection will be discussed

  14. Fuel assembly inspection device

    International Nuclear Information System (INIS)

    Yaginuma, Yoshitaka

    1998-01-01

    The present invention provides a device suitable to inspect appearance of fuel assemblies by photographing the appearance of fuel assemblies. Namely, the inspection device of the present invention measures bowing of fuel assembly or each of fuel rods or both of them based on the partially photographed images of fuel assembly. In this case, there is disposed a means which flashily projects images in the form of horizontal line from a direction intersecting obliquely relative to a horizontal cross section of the fuel assembly. A first image processing means separates the projected image pictures including projected images and calculates bowing. A second image processing means replaces the projected image pictures of the projected images based on projected images just before and after the photographing. Then, images for the measurement of bowing and images for inspection can be obtained simultaneously. As a result, the time required for the photographing can be shortened, the time for inspection can be shortened and an effect of preventing deterioration of photographing means by radiation rays can be provided. (I.S.)

  15. Risk-Informed Decisions Optimization in Inspection and Maintenance

    International Nuclear Information System (INIS)

    Robertas Alzbutas

    2002-01-01

    The Risk-Informed Approach (RIA) used to support decisions related to inspection and maintenance program is considered. The use of risk-informed methods can help focus the adequate in-service inspections and control on the more important locations of complex dynamic systems. The focus is set on the highest risk measured as conditional core damage frequency, which is produced by the frequencies of degradation and final failure at different locations combined with the conditional failure consequence probability. The probabilities of different degradation states per year and consequences are estimated quantitatively. The investigation of inspection and maintenance process is presented as the combination of deterministic and probabilistic analysis based on general risk-informed model, which includes the inspection and maintenance program features. Such RIA allows an optimization of inspection program while maintaining probabilistic and fundamental deterministic safety requirements. The failure statistics analysis is used as well as the evaluation of reliability of inspections. The assumptions regarding the effectiveness of the inspection methods are based on a classification of the accessibility of the welds during the inspection and on the different techniques used for inspection. The probability of defect detection is assumed to depend on the parameters either through logarithmic or logit transformation. As example the modeling of the pipe systems inspection process is analyzed. The means to reduce a number of inspection sites and the cumulative radiation exposure to the NPP inspection personnel with a reduction of overall risk is presented together with used and developed software. The developed software can perform and administrate all the risk evaluations and ensure the possibilities to compare different options and perform sensitivity analysis. The approaches to define an acceptable level of risk are discussed. These approaches with appropriate software in

  16. Periodic vehicle inspection (MOT). [previously: Periodic Vehicle Inspection of cars (MOT).

    OpenAIRE

    2010-01-01

    In the 1980s the periodic vehicle inspection (MOT) of various categories of vehicles was introduced in the Netherlands. This fact sheet will discuss the legal framework of this measure and the research carried out into its effects on road safety, also in an international context. For instance, the technical conditions of cars at inspection as well as that of cars involved in crashes were studied. Tyre pressure will also be discussed in this fact sheet.

  17. Plant inspection and maintenance technology

    International Nuclear Information System (INIS)

    Miyahara, Masatoshi; Kanazawa, Masafumi

    1995-01-01

    The article reports on information systems and related tools that support routine inspection and preventive maintenance activities, which contribute to safer plant operation and increase plant operating duty. Tools include the Mitsubishi Electric Reliability and Availability Upgrade Program-Nuclear (MELRAP-N), which supports the general evolution of industry operating experiences, periodic component replacement management, management of discontinued and modified components, periodic inspection item management, and periodic inspection workplace management. The article also introduces a comprehensive preventive maintenance management system currently under development. (author)

  18. Turning inspection regulations into training tools

    International Nuclear Information System (INIS)

    Finley, D.; Wheatcraft, D.

    1996-01-01

    In response to suggestions from internal and State of California auditors, the Hazardous Waste Management Division (HWM) at Lawrence Livermore National Laboratory prepared an Inspection Schedule and Guidance Document that summarizes the Laboratory's inspection schedule and procedures for waste treatment, storage, and disposal facilities (TSDFs). Because it explains and comments in detail on the inspection schedule, forms, and procedures, this document is a centralized reference for HWM managers and personnel performing TSDF inspections at the Laboratory. It is also a training tool for experienced and new inspectors, standardizing the inspections of personnel with experience and explaining to novices what to look for and why. This poster presentation traces the team effort that created this document and provides specific examples of how the document was developed and how it is used

  19. Strategic environmental safety inspection for the National disposal program. Description of the inspection volume. Documentation for the scoping team

    International Nuclear Information System (INIS)

    2015-01-01

    The Strategic environmental safety inspection for the National disposal program covers the following topics: Legal framework: determination of the requirement for an environmental inspection program, coordination of the scoping team into the overall context; environmental targets; approach for assessment and evaluation of environmental impact, description of the inspection targets for the strategic environmental inspection; consideration of alternatives.

  20. Licensee Contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1992-01-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organization during the period from October through December 1991

  1. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1993-08-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organizations during the period from April through June 1993

  2. Licensee contractor and Vendor Inspection status report

    International Nuclear Information System (INIS)

    1992-05-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organizations during the period from January through March 1992

  3. Task of radiation hygiene inspection at NPPs

    International Nuclear Information System (INIS)

    Shevts, J.; Kunz, Eh.

    1983-01-01

    The task and functions of the radiation-hygiene inspection in Czechoslovakia are presented. The radiation safety related information amounts that are to be presented to the hygiene inspection institutions are determined. The hygiene inspection content and forms at the stages of NPP designing, construction and operation are discussed. The hygiene inspection place is determined within the general radiation safety system [ru

  4. 42 CFR 456.602 - Inspection team.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Inspection team. 456.602 Section 456.602 Public... Institutions for Mental Diseases § 456.602 Inspection team. (a) A team, as described in this section and § 456... team conducting periodic inspections must have a least one member who is at physician or registered...

  5. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1991-05-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organization during the period from January 1991 through March 1991

  6. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1991-02-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organizations during the period from October 1990 through December 1990

  7. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1993-05-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organizations during the period from January 1993 through March 1993

  8. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1991-09-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organization during the period from April 1991 through June 1991

  9. Licensee contractor and Vendor Inspection status report

    International Nuclear Information System (INIS)

    1993-01-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organizations during the period from October 1992 through December 1992

  10. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1989-12-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organizations during the period from July 1989 through September 1989

  11. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1990-07-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organization during the period from January 1990 through March 1990

  12. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1990-01-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organizations during the period from October 1989 through December 1989

  13. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1992-11-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organization during the period from July 1992 through September 1992

  14. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1991-10-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organization during the period from July 1991 through September 1991

  15. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1990-11-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organization during the period from April 1990 through June 1990

  16. An optimal inspection strategy for randomly failing equipment

    International Nuclear Information System (INIS)

    Chelbi, Anis; Ait-Kadi, Daoud

    1999-01-01

    This paper addresses the problem of generating optimal inspection strategies for randomly failing equipment where imminent failure is not obvious and can only be detected through inspection. Inspections are carried out following a condition-based procedure. The equipment is replaced if it has failed or if it shows imminent signs of failure. The latter state is indicated by measuring certain predetermined control parameters during inspection. Costs are associated with inspection, idle time and preventive or corrective actions. An optimal inspection strategy is defined as the inspection sequence minimizing the expected total cost per time unit over an infinite span. A mathematical model and a numerical algorithm are developed to generate an optimal inspection sequence. As a practical example, the model is applied to provide a machine tool operator with a time sequence for inspecting the cutting tool. The tool life time distribution and the trend of one control parameter defining its actual condition are supposed to be known

  17. Software inspections at Fermilab -- Use and experience

    International Nuclear Information System (INIS)

    Berman, E.F.

    1998-01-01

    Because of the critical nature of DA/Online software it is important to commission software which is correct, usable, reliable, and maintainable, i.e., has the highest quality possible. In order to help meet these goals Fermi National Accelerator Laboratory (Fermilab) has begun implementing a formal software inspection process. Formal Inspections are used to reduce the number of defects in software at as early a stage as possible. These Inspections, in use at a wide variety of institutions (e.g., NASA, Motorola), implement a well-defined procedure that can be used to improve the quality of many different types of deliverables. The inspection process, initially designed by Michael Fagan, will be described as it was developed and as it is currently implemented at Fermilab where it has been used to improve the quality of a variety of different experiment DA/Online software. Benefits of applying inspections at many points in the software life-cycle and benefits to the people involved will be investigated. Experience with many different types of Inspections and the lessons learned about the inspection process itself will be detailed. Finally, the future of Inspections at Fermilab will be given

  18. Development of an automatic reactor inspection system

    International Nuclear Information System (INIS)

    Kim, Jae Hee; Eom, Heung Seop; Lee, Jae Cheol; Choi, Yoo Raek; Moon, Soon Seung

    2002-02-01

    Using recent technologies on a mobile robot computer science, we developed an automatic inspection system for weld lines of the reactor vessel. The ultrasonic inspection of the reactor pressure vessel is currently performed by commercialized robot manipulators. Since, however, the conventional fixed type robot manipulator is very huge, heavy and expensive, it needs long inspection time and is hard to handle and maintain. In order to resolve these problems, we developed a new automatic inspection system using a small mobile robot crawling on the vertical wall of the reactor vessel. According to our conceptual design, we developed the reactor inspection system including an underwater inspection robot, a laser position control subsystem, an ultrasonic data acquisition/analysis subsystem and a main control subsystem. We successfully carried out underwater experiments on the reactor vessel mockup, and real reactor ready for Ulchine nuclear power plant unit 6 at Dusan Heavy Industry in Korea. After this project, we have a plan to commercialize our inspection system. Using this system, we can expect much reduction of the inspection time, performance enhancement, automatic management of inspection history, etc. In the economic point of view, we can also expect import substitution more than 4 million dollars. The established essential technologies for intelligent control and automation are expected to be synthetically applied to the automation of similar systems in nuclear power plants

  19. Cost-risk optimization of nondestructive inspection level

    International Nuclear Information System (INIS)

    Johnson, D.P.

    1978-01-01

    This paper develops a quantitative methodology for determining the nondestructive inspection (NDI) level that will result in a minimum cost product considering both type one inspection errors, acceptance of defective material units, and type two inspection errors, rejection of sound material units. This methodology represents an advance over fracture mechanics - nondestructive inspection (FM-NDI) design systems that do not consider type two inspection errors or the pre-inspection material quality. The inputs required for the methodology developed in this paper are (1) the rejection probability as a function of inspection size and imperfection size, (2) the flaw frequency (FF), as a function of imperfection size, (3) the probability of failure given the material unit contains an imperfection of a given size as a function of that given size, (4) the manufacturing cost per material unit, (5) the inspection cost per material unit, and (6) the average cost per failure including indirect costs. Four methods are identified for determining the flaw-frequency and three methods are identified for determining the conditional failure probability (one of these methods is probabilistic fracture mechanics). Methods for determining the rejection probability are discussed elsewhere. The NDI-FF methodology can have significant impact where the cost of failures represents a significant fraction of the manufacturing costs, or when a significant fraction of the components are being rejected by the inspection. (Auth.)

  20. Boresonic inspection of power plant rotors

    International Nuclear Information System (INIS)

    Rennie, I.S.

    1990-01-01

    Continental Field Machining and NEI Parsons together are able to provide an on site machining and boresonic inspection service. NEI Parsons existing boresonic equipment is described together with a summary of results obtained during the inspection of eighty rotors. A computer controlled automatic inspection system, planned to be in operation early in 1990, is also described

  1. Restaurant inspection frequency: The RestoFreq Study.

    Science.gov (United States)

    Medu, Olanrewaju; Turner, Hollie; Cushon, Jennifer A; Melis, Deborah; Rea, Leslie; Abdellatif, Treena; Neudorf, Cory O; Schwandt, Michael

    2017-03-01

    Foodborne illness is an important contributor to morbidity and health system costs in Canada. Using number of critical hazards as a proxy for food safety, we sought to better understand how to improve food safety in restaurants. We compared the current standard of annual inspections to twice-yearly inspections among restaurants "at risk" for food safety infractions. These were restaurants that had three or more elevated-risk inspection ratings in the preceding 36 months. We conducted a two-arm randomized controlled trial between November 2012 and October 2014. The intervention was twice-yearly routine restaurant inspection compared to standard once-yearly routine inspection. Included were all restaurants within Saskatoon Health Region that were assessed as "at risk", with 73 restaurants in the intervention arm and 78 in the control arm. Independent sample t-tests were conducted between groups to compare: i) average number of critical hazards per inspection; and ii) proportion of inspections resulting in a rating indicating an elevated hazard. Over time we noted statistically significant improvements across both study arms, in number of both critical food safety hazards (decreased by 61%) and elevated-risk inspection ratings (decreased by 45%) (p < 0.0001). We observed no significant differences between the two groups pre- or post-intervention. Results suggest increasing the number of annual routine inspections in high-risk restaurants was not associated with a significant difference in measures of compliance with food safety regulations. Findings of this study do not provide evidence supporting increased frequency of restaurant inspection from annually to twice annually.

  2. Inspection device in liquid

    International Nuclear Information System (INIS)

    Nagaoka, Etsuo.

    1996-01-01

    The present invention provides an inspection device in PWR reactor core in which inspection operations are made efficient by stabilizing a posture of the device in front-to-back, vertical and left-to-right directions by a simple structure. When the device conducts inspection while running in liquid, the front and the back directions of the device main body are inspected using a visual device while changing the posture by operating a front-to-back direction propulsion device and a right-to-left direction propulsion device, and a vertical direction propulsion device against to rolling, pitching and yawing of the device main body. In this case, a spherical magnet moves freely in the gravitational direction in a vibration-damping fluid in a non-magnetic spherical shell following the change of the posture of the device main body, in which the vibrations due to the movement of the spherical magnet is settled by the vibration-damping fluid thereby stabilizing the posture of the device main body. At a typical inspection posture, the settling effect is enhanced by the attraction force between the spherical magnets in the spherical shell and each of magnetic force-attracted magnetic members disposed to the outer circumference of the shell, and the posture of the device main body can be confirmed in front-to-back, right-to-left and vertical directions by each of the posture confirming magnetic sensors. (N.H.)

  3. 46 CFR 167.15-10 - Application for annual inspection.

    Science.gov (United States)

    2010-10-01

    ... NAUTICAL SCHOOL SHIPS Inspections § 167.15-10 Application for annual inspection. Application in writing for the annual inspection of every nautical school ship required to be inspected by law and the... Inspection, at any local Marine Inspection Office, U.S. Coast Guard, where the nautical school ship may be...

  4. Apparatus for integrated fuel assembly inspection system

    International Nuclear Information System (INIS)

    Ahmed, H.J.; Burchill, S.R.

    1988-01-01

    In a fuel assembly inspection apparatus, the combination is described comprising: (a) an elongated fixture mounted in a stationary upright position; (b) upper means mounted to an upper portion of the fixture and lower means mounted adjacent to a lower portion of the fixture, the upper and lower means being disposed outwardly from a side of the fixture for supporting a nuclear fuel assembly therebetween and extending along the side of the fixture; (c) a bottom carriage having a central opening adapted to receive the fuel assembly therethrough when supported between the upper and lower means such that the bottom carriage being connected only to, and extending in cantilever fashion outwardly from, the side of the fixture for generally vertical movement along the side of the fixture and along the fuel assembly extending along the side of the fixture; (d) drive means for selectively moving the bottom carriage; and (e) means disposed on the bottom carriage for measuring the envelop, of the fuel assembly when the bottom carriage is moved to and stationed at selected axial positions along the fuel assembly

  5. Noncontacting Optical Measurement And Inspection Systems

    Science.gov (United States)

    Asher, Jeffrey A.; Jackson, Robert L.

    1986-10-01

    Product inspection continues to play a growing role in the improvement of quality and reduction of scrap. Recent emphasis on precision measurements and in-process inspection have been a driving force for the development of noncontacting sensors. Noncontacting sensors can provide long term, unattended use due to the lack of sensor wear. Further, in applications where, sensor contact can damage or geometrically change the part to be measured or inspected, noncontacting sensors are the only technical approach available. MTI is involved in the development and sale of noncontacting sensors and custom inspection systems. This paper will review the recent advances in noncontacting sensor development. Machine vision and fiber optics sensor systems are finding a wide variety of industrial inspection applications. This paper will provide detailed examples of several state-of-the-art applications for these noncontacting sensors.

  6. System for inspection of stacked cargo containers

    Science.gov (United States)

    Derenzo, Stephen [Pinole, CA

    2011-08-16

    The present invention relates to a system for inspection of stacked cargo containers. One embodiment of the invention generally comprises a plurality of stacked cargo containers arranged in rows or tiers, each container having a top, a bottom a first side, a second side, a front end, and a back end; a plurality of spacers arranged in rows or tiers; one or more mobile inspection devices for inspecting the cargo containers, wherein the one or more inspection devices are removeably disposed within the spacers, the inspection means configured to move through the spacers to detect radiation within the containers. The invented system can also be configured to inspect the cargo containers for a variety of other potentially hazardous materials including but not limited to explosive and chemical threats.

  7. A pulsed eddy current probe for inspection of support plates from within Alloy-800 steam generator tubes

    International Nuclear Information System (INIS)

    Krause, T. W.; Babbar, V. K.; Underhill, P. R.

    2014-01-01

    Support plate degradation and fouling in nuclear steam generators (SGs) can lead to SG tube corrosion and loss of efficiency. Inspection and monitoring of these conditions can be integrated with preventive maintenance programs, thereby advancing station-life management processes. A prototype pulsed eddy current (PEC) probe, targeting inspection issues associated with SG tubes in SS410 tube support plate structures, has been developed using commercial finite element (FE) software. FE modeling was used to identify appropriate driver and pickup coil configurations for optimum sensitivity to changes in gap and offset for Alloy-800 SG tubes passing through 25 mm thick SS410 support plates. Experimental measurements using a probe that was manufactured based on the modeled configuration, were used to confirm the sensitivity of differential PEC signals to changes in relative position of the tube within the tube support plate holes. Models investigated the effect of shift and tilt of tube with respect to hole centers. Near hole centers and for small shifts, modeled signal amplitudes from the differentially connected coil pairs were observed to change linearly with tube shift. This was in agreement with experimentally measured TEC coil response. The work paves the way for development of a system targeting the inspection and evaluation of support plate structures in steam generators

  8. A pulsed eddy current probe for inspection of support plates from within Alloy-800 steam generator tubes

    Science.gov (United States)

    Krause, T. W.; Babbar, V. K.; Underhill, P. R.

    2014-02-01

    Support plate degradation and fouling in nuclear steam generators (SGs) can lead to SG tube corrosion and loss of efficiency. Inspection and monitoring of these conditions can be integrated with preventive maintenance programs, thereby advancing station-life management processes. A prototype pulsed eddy current (PEC) probe, targeting inspection issues associated with SG tubes in SS410 tube support plate structures, has been developed using commercial finite element (FE) software. FE modeling was used to identify appropriate driver and pickup coil configurations for optimum sensitivity to changes in gap and offset for Alloy-800 SG tubes passing through 25 mm thick SS410 support plates. Experimental measurements using a probe that was manufactured based on the modeled configuration, were used to confirm the sensitivity of differential PEC signals to changes in relative position of the tube within the tube support plate holes. Models investigated the effect of shift and tilt of tube with respect to hole centers. Near hole centers and for small shifts, modeled signal amplitudes from the differentially connected coil pairs were observed to change linearly with tube shift. This was in agreement with experimentally measured TEC coil response. The work paves the way for development of a system targeting the inspection and evaluation of support plate structures in steam generators.

  9. Subsea Infrastructure Inspection

    DEFF Research Database (Denmark)

    Mai, Christian; Pedersen, Simon; Hansen, Leif

    2016-01-01

    Due to the increasing energy demands, the offshore energy business has boomed in recent decades. Sub-sea pipeline and power transmission cable installations are commonly applied worldwide. Any potential breakages can cause equipment damage and also damage the environment. The majority...... (S-AUVs) can significantly change the inspections of infrastructure, as these vehicles could be much cheaper to deploy. S-AUVs can potentially conduct faster data collection and provide higher inspection data quality. However, there are still some technical challenges related to: underwater wireless...

  10. Risk informed In-service Inspection

    International Nuclear Information System (INIS)

    Corak, Z.

    2003-01-01

    Safety of nuclear power plants is one of the most important conditions for their acceptance. Safety is being acheived by numerous methods and techniques in phase of design, manufacturing and maintenance of the nuclear power plants. In-service Inspection (ISI) has a significant role in avoidances of failure in components of nuclear power plants just the same as in assurance of their integrity. Non-destructive examinations are performed periodically in accordance with 10 CFR 50 50.55a and ASME Boiler and Pressure Vessel Code section XI which is referenced by 10 CFR 50.55a. Nondestructive examinations provide information about a current condition of equipment at nuclear power plants and about any damage, defect or degradation mechanism. A lot of effort is often spent in situations in which the probability of failure and their effects on safety have a very low impact. Practical experience shows that failures can often occur at locations where the inspection has never been performed. Costs and expenses of in-service inspections are very high. Therefore, the accent has to be on locations with significant risk to safety. Many years of nuclear power plants' operation and maintenance have resulted in a more broad knowledge of degradation mechanism and the most susceptible locations and huge databases of different nuclear power plants' components. U.S. Nuclear Regulatory Commission (NRC) and the nuclear industry have recognized that probabilistic risk assessment (PRA) has developed and changed to be more useful in improvement of traditional engineering approaches in nuclear power plants regulation. After the publication of its policy statement on the use of PRA in nuclear regulatory activities, the Commission ordered the NRC staff to develop a regulatory framework that incorporated risk insights. The American Society of Mechanical Engineers (ASME) initiated Code Case N-560, N-577, and N-578 that address the importance of categorization and inspection of piping using risk

  11. Automated visual inspection of moving custom parts

    CSIR Research Space (South Africa)

    Davrajh, S

    2008-01-01

    Full Text Available frequencies than batched produced parts. This higher frequency of inspection significantly impacts inspection times, and inherently, production rates. An effective, diverse, accurate, robust, and time efficient method for inspecting custom parts is therefore...

  12. Inspection of Emergency Arrangements

    International Nuclear Information System (INIS)

    2013-01-01

    The Working Group on Inspection Practices (WGIP) was tasked by the NEA CNRA to examine and evaluate the extent to which emergency arrangements are inspected and to identify areas of importance for the development of good inspection practices. WGIP members shared their approaches to the inspection of emergency arrangements by the use of questionnaires, which were developed from the requirements set out in IAEA Safety Standards. Detailed responses to the questionnaires from WGIP member countries have been compiled and are presented in the appendix to this report. The following commendable practices have been drawn from the completed questionnaires and views provided by WGIP members: - RBs and their Inspectors have sufficient knowledge and information regarding operator's arrangements for the preparedness and response to nuclear emergencies, to enable authoritative advice to be given to the national coordinating authority, where necessary. - Inspectors check that the operator's response to a nuclear emergency is adequately integrated with relevant response organisations. - Inspectors pay attention to consider the integration of the operator's response to safety and security threats. - The efficiency of international relations is checked in depth during some exercises (e.g. early warning, assistance and technical information), especially for near-border facilities that could lead to an emergency response abroad. - RB inspection programmes consider the adequacy of arrangements for emergency preparedness and response to multi-unit accidents. - RBs assess the adequacy of arrangements to respond to accidents in other countries. - The RB's role is adequately documented and communicated to all agencies taking part in the response to a nuclear or radiological emergency. - Inspectors check that threat assessments for NPPs have been undertaken in accordance with national requirements and that up-to-date assessments have been used as the basis for developing emergency plans for

  13. User interface inspection methods a user-centered design method

    CERN Document Server

    Wilson, Chauncey

    2014-01-01

    User Interface Inspection Methods succinctly covers five inspection methods: heuristic evaluation, perspective-based user interface inspection, cognitive walkthrough, pluralistic walkthrough, and formal usability inspections. Heuristic evaluation is perhaps the best-known inspection method, requiring a group of evaluators to review a product against a set of general principles. The perspective-based user interface inspection is based on the principle that different perspectives will find different problems in a user interface. In the related persona-based inspection, colleagues assume the

  14. Inspection of licensee activities in emergency planning

    International Nuclear Information System (INIS)

    Van Binnebeek, J.J.; Gutierrez Ruiz, Luis Miguel; Bouvrie, E. des; Aro, Ilari; Gil, J.; Balloffet, Yves; Forsberg, Staffan; Klonk, H.; Lang, Hans-Guenter; Fichtinger, G.; Warren, T.; Manzella, P.; Gallo, R.; Koizumi, Hiroyoshi; Johnson, M.; Pittermann, P.

    1998-01-01

    The CNRA believes that safety inspections are a major element in the regulatory authority's efforts to ensure the safe operation of nuclear facilities. Considering the importance of these issues, the Committee has established a special Working Group on Inspection Practices (WGIP). The purpose of WGIP, is to facilitate the exchange of information and experience related to regulatory safety inspections between CNRA Member countries Following discussions at several meetings on the topic of what is expected by the regulatory body regarding inspection criteria, WGIP proposed putting together a compilation of Member countries practices on regulatory inspection practices with respect to licensee emergency planning. CNRA approved this task and this report. Information was collected from a questionnaire which was issued in 1996. The report presents information on regulatory inspection activities with respect to emergency planning in NEA Member countries. The focus of the report is on the third section. It reviews the similarities and differences in inspection practices to evaluate compliance with the requirements over which the regulatory body (RB) has jurisdiction

  15. Pressure vessel integrity and weld inspection procedure

    International Nuclear Information System (INIS)

    Solomon, K.A.; Okrent, D.; Kastenberg, W.E.

    1975-01-01

    The primary objective of this paper is to develop a simple methodology which, when coupled with existing observations on pressure vessel behavior, provides an inter-relation between pressure vessel integrity, and the parameters of the in-service inspection program, including inspection sample size, frequency and efficiency. A modified Markov process is employed and a computer code was written to obtain numerical results. The Markov process mathematically describes the following physical events. In a nuclear reactor pressure vessel weld, some defects may exist prior to the zeroth inspection (i.e., prior to vessel operation). During the zeroth inspection and repair processes, some of these defects are removed. During the first cycle of vessel operation, the existing defects may grow and some new defects may be generated. Those defects that are found at the first (and succeeding) inspection interval and warrant repair, are repaired. The above process continues through several operating cycles to the end of vessel life. During any inspection, only a portion of the welds may be inspected, and with less than perfect efficiency

  16. Development of bore tools for pipe inspection

    Energy Technology Data Exchange (ETDEWEB)

    Oka, Kiyoshi; Nakahira, Masataka; Taguchi, Kou; Ito, Akira [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-04-01

    In the International Thermonuclear Reactor (ITER), replacement and maintenance on in-vessel components requires that all cooling pipes connected be cut and removed, that a new component be installed, and that all cooling pipes be rewelded. After welding is completed, welded area must be inspected for soundness. These tasks require a new work concept for securing shielded area and access from narrow ports. Tools had to be developed for nondestructive inspection and leak testing to evaluate pipe welding soundness by accessing areas from inside pipes using autonomous locomotion welding and cutting tools. A system was proposed for nondestructive inspection of branch pipes and the main pipe after passing through pipe curves, the same as for welding and cutting tool development. Nondestructive inspection and leak testing sensors were developed and the basic parameters were obtained. In addition, the inspection systems which can move inside pipes and conduct the nondestructive inspection and the leak testing were developed. In this paper, an introduction will be given to the current situation concerning the development of nondestructive inspection and leak testing machines for the branch pipes. (author)

  17. Heat exchanger tube inspection using ultrasonic arrays

    International Nuclear Information System (INIS)

    Meyer, P.A.; Carodiskey, T.J.

    1986-01-01

    Tubing used in industrial heat exchangers is often subject to failure caused by corrosion and cracking. Technical conferences are used as a forum in the steam generator industry to ensure that the failure mechanisms are well understood and that the quality of the heat exchanger is maintained. The quality of a heat exchanger can be thought of as its ability to operate to design specifications over its intended life. This is the motivation to inspect and evaluate these devices periodically. Inspection, however, normally requires shutdown of the heat exchanger which is costly but is much more acceptable than an unscheduled shutdown due to failure of a tube. Therefore, the degree of inspection is established by balancing the cost of inspection with the risk of a tube failure. Any method of reducing the cost of inspection will permit a higher degree of inspection and, therefore, improve heat exchanger quality. This paper reviews the design and performance of an improved method of ultrasonic inspection of heat exchanger tubing with emphasis on applications in the nuclear industry

  18. In-service inspection guidelines for composite aerospace structures

    International Nuclear Information System (INIS)

    Heida, Jaap H.; Platenkamp, Derk J.

    2012-01-01

    The in-service inspection of composite aerospace structures is reviewed, using the results of a evaluation of promising, mobile non-destructive inspection (NDI) methods. The evaluation made use of carbon fibre reinforced specimens representative for primary composite aerospace structures, including relevant damage types such as impact damage, delaminations and disbonds. A range of NDI methods were evaluated such as visual inspection, vibration analysis, phased array ultrasonic inspection, shearography and thermography inspection. Important aspects of the evaluation were the capability for defect detection and characterization, portability of equipment, field of view, couplant requirements, speed of inspection, level of training required and the cost of equipment. The paper reviews the damage tolerance design approach for composites, and concludes with guidelines for the in-service inspection of composite aerospace structures.

  19. Inspection technologies -Development of national safeguards technology-

    International Nuclear Information System (INIS)

    Hong, J. S.; Kim, B. K.; Kwack, E. H.

    1996-12-01

    17 facility regulations prepared by nuclear facilities according to the Ministerial Notices were evaluated. Safeguards inspection activities under Safeguards are described. Safeguards inspection equipments and operation manuals to be used for national inspection are also described. Safeguards report are produced and submitted to MOST by using the computerized nuclear material accounting system at state level. National inspection support system are developed to produce the on-site information for domestic inspection. Planning and establishment of policy for nuclear control of nuclear materials, international cooperation for nuclear control, CTBT, strengthening of international safeguards system, and the supply of PWRs to North Korea are also described. (author). 43 tabs., 39 figs

  20. Study on In-Service Inspection Program and Inspection Technologies for Commercialized Sodium-Cooled Fast Reactor

    International Nuclear Information System (INIS)

    Masato Ando; Shigenobu Kubo; Yoshio Kamishima; Toru Iitsuka

    2006-01-01

    The objective of in-service inspection of a nuclear power plant is to confirm integrity of function of components necessary to safety, and satisfy the needs to protect plant investment and to achieve high plant ability. The sodium-cooled fast reactor, which is designed in the feasibility study on commercialized fast reactor cycle systems in Japan, has two characteristics related to in-service inspection. The first is that all sodium coolant boundary structures have double-wall system. Continuous monitoring of the sodium coolant boundary structures are adopted for inspection. The second characteristic is the steam generator with double-wall-tubes. Volumetric testing is adopted to make sure that one of the tubes can maintain the boundary function in case of the other tube failure. A rational in-service inspection concept was developed taking these features into account. The inspection technologies were developed to implement in-service inspection plan. The under-sodium viewing system consisted of multi ultrasonic scanning transducers, which was used for imaging under-sodium structures. The under-sodium viewing system was mounted on the under-sodium vehicle and delivered to core internals. The prototype of under-sodium viewing system and vehicle were fabricated and performance tests were carried out under water. The laboratory experiments of volumetric testing for double-wall-tubes of steam generator, such as ultrasonic testing and remote-field eddy current testing, were performed and technical feasibility was assessed. (authors)

  1. 9 CFR 355.21 - Products entering inspected plants.

    Science.gov (United States)

    2010-01-01

    ... INSPECTION AND CERTIFICATION CERTIFIED PRODUCTS FOR DOGS, CATS, AND OTHER CARNIVORA; INSPECTION... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Products entering inspected plants. 355.21 Section 355.21 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF...

  2. Optimizing the design of international safeguards inspection systems

    International Nuclear Information System (INIS)

    Markin, J.T.; Coulter, C.A.; Gutmacher, R.G.; Whitty, W.J.

    1983-01-01

    Efficient implementation of international inspections for verifying the operation of a nuclear facility requires that available resources be allocated among inspection activities to maximize detection of misoperation. This report describes a design and evaluation method for selecting an inspection system that is optimal for accomplishing inspection objectives. The discussion includes methods for identifying system objectives, defining performance measures, and choosing between candidate systems. Optimization theory is applied in selecting the most preferred inspection design for a single nuclear facility, and an extension to optimal allocation of inspection resources among States containing multiple facilities is outlined. 3 figures, 5 tables

  3. Lietuvos Dujos. Inspection of pipeline - Phase 2. Final report. Cathodic protection

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-01-01

    Inspection of pipeline - phase 2 included the following activities: Task 1: On-site training with CP survey equipment combined with a check of CP installations on a pipeline section. Task 2: On-site training with CP survey equipment after remedial work has been done, based on the recommendations given in the task 1 report. Task 3. Assistance to Lietuvos Dujos preparation of a CP survey report. Guidance in how results can be evaluated and main findings reported will be given. Task 4: Assistance to Lietuvos Dujos for installation of two CP stations with anodebed. This final report presents the results of task 2, 3 and 4. Only the major results of task 1 are described, thus the results of task 1 is described in details in the Interim Report, September 1996. (au)

  4. In-service inspection and periodic testing

    International Nuclear Information System (INIS)

    Eisele, H.; Meyer, F.A.; Zipser, R.R.

    1981-01-01

    In-service inspections are performed to verify the operational safety, and maintenance work is performed to guarantee the availability. Below, the typical in-service inspections of a light-water reactor NPP (operated on a pressurized-water reactor/PWR/ or on a boiling-water reactor/BWR/) are described with details and examples of typical inspections, especially of recurrent performance tests of the systems. (orig./RW)

  5. In-service inspection and periodic testing

    International Nuclear Information System (INIS)

    Eisele, H.; Meyer, F.A.; Zipser, R.R.

    1980-01-01

    In-service inspections are performed to verify the operational safety, and maintenance work is performed to guarantee the availability. In the present paper, the typical in-service inspections of a light-water reactor NPP (operated on a pressurized-water reactor/PWR/ or on a boiling-water reactor/BWR/) are described with details and examples of typical inspections, especially of recurrent performance tests of the systems. (orig./RW)

  6. 9 CFR 355.3 - Plants eligible for inspection.

    Science.gov (United States)

    2010-01-01

    ... INSPECTION AND CERTIFICATION CERTIFIED PRODUCTS FOR DOGS, CATS, AND OTHER CARNIVORA; INSPECTION... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Plants eligible for inspection. 355.3 Section 355.3 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE...

  7. Promoting transparency: The Korean national inspection experience

    International Nuclear Information System (INIS)

    Kim, B.K.

    1999-01-01

    The Republic of Korea started the LAMA full-scope safeguards inspection with the TRIGA research reactor in 1976 when the nuclear industry was at its infancy. Over two decades of rapid economic growth was propelled by stable supply of electricity, substantially from nuclear energy. Today nearly half of the nations electricity comes from sixteen operating nuclear power plants (12 LWRs + 4 OLRs). Total number of facilities under IAEA inspection reaches 30 where the Agency conducts about 400 PDIs annually. Within the last decade, nuclear transparency in Korea has transformed into the international norm primarily from the needs of rapidly expanding domestic nuclear program. In addition, possibility of North/South mutual inspection helped initiate the national inspection regime in addition to the IAEA inspection. The Technology Center for Nuclear Control was established at KAERI in 1994 in order to maintain the nation's nuclear verification expertise in support of the Korean government. National inspections have been carried out simultaneously with the IAEA inspection since 1997 with trial facilities, and all domestic facilities are being inspected from this year. Necessary legal framework and working procedures were developed and field-tried for LWRs, OLRs, fuel fabrication plants and research reactor facilities. Although the inspection equipment and technology along with the safeguards criteria are quite similar to those of the Agency, it is essential to maintain the independent conclusion capabilities between IAEA and the national authority. Substantial improvements in the IAEA safeguards inspection goal attainments since 1997 are credited to the increasing safeguards awareness among operators and SSAC. Further work is necessary to develop the evaluation criteria based on the field inspection results to meet the national inspection goals. The Korean Government signed the Additional Protocol with IAEA on June, 1999 after much deliberation since it involves facilities

  8. Analysis of radiation exposure during creep adjustment to the coolant channels at Madras Atomic Power Station

    International Nuclear Information System (INIS)

    Varadhan, R.S.; Venkataramana, K.; Kannan, R.K.; Sreekumaran Nair, B.; Chudalayandi, K.

    1994-01-01

    In pressurised heavy water reactors the coolant channels made of zircaloy-2 undergo creep deformation used intense neutron irradiation in the reactor core. In order to measure and provide for the changes in the dimensions, base line data of internal diameters, sag and length of the 306 coolant channels are measured as pre service inspection (PSI) before the reactor is loaded with fuel prior to criticality. Subsequently as part of in service inspection (ISI), axial creep of every channel is measured in every annual shutdown of the reactor and creep adjustment is done on those channels where creep expansion margin for the next one year operation is low. A study was carried out to assess the radiological impact of the job at Madras Atomic Power Station (MAPS). Various measures adopted for reducing the individual and collective doses on the job are discussed in this report. (author). 3 refs., 2 tabs

  9. 1990 waste tank inspection program

    International Nuclear Information System (INIS)

    McNatt, F.G.

    1990-01-01

    Aqueous radioactive wastes from Savannah River Site separations processes are contained in large underground carbon steel tanks. Tank conditions are evaluated by inspection using periscopes, still photography, and video systems for visual imagery. Inspections made in 1990 are the subject of this report

  10. X-ray inspection of foreign bodies in foods

    International Nuclear Information System (INIS)

    Ohira, Norihiro; Hongjun, Zhou; Sakamaki, Kazumi; Kamimura, Kunio; Shimizu, Hideaki; Saiki, Hideo

    2008-01-01

    X-ray inspection system of foreign bodies in foods has become is necessary for our society in recent years, with the expectation that they could inspect not only metals but also other bodies like glass, rubber, nylon, etc. Calculation algorithms for X-ray inspection of foreign bodies in foods have been reported. In food inspection systems, it is important that inspection is high precision, with high speed that is as fast as conveyor belts. Using Statistical methods, we construct a higher precision method than usual methods. We focused on Kittler's minimum error thresholding. In the usual Kittler's method, order n-squared calculations are required for distributed calculation, so it is not suitable for high speed food inspection. We find that using approximations of variances in Kittler's method is not too critical for practical use. Using it, we be come able to inspect for foreign bodies that were not able to be inspected for so far. (author)

  11. In-field inspection support software: A status report on the Common Inspection On-site Software Package (CIOSP) project

    International Nuclear Information System (INIS)

    Novatchev, Dimitre; Titov, Pavel; Siradjov, Bakhtiiar; Vlad, Ioan; Xiao Jing

    2001-01-01

    Full text: IAEA has invested much thought and effort into developing software that can assist inspectors during their inspection work. Experience with such applications has been steadily growing and IAEA has recently commissioned a next-generation software package. This kind of software accommodates inspection tasks that can vary substantially in function depending on the type of installation being inspected as well as ensures that the resulting software package has a wide range of usability and can preclude excessive development of plant-specific applications. The Common Inspection On-site Software Package is being developed in the Department of Safeguards to address the limitations of the existing software and to expand its coverage of the inspection process. CIOSP is 'common' in that it is aimed at providing support for as many facilities as possible with the minimum re-configuration. At the same time it has to cater to varying needs of individual facilities, different instrumentation and verification methods used. A component-based approach was taken to successfully tackle the challenges that the development of this software presented. CIOSP consists of the following major components: A framework into which individual plug-ins supporting various inspection activities can integrate at run-time; A central data store containing all facility configuration data and all data collected during inspections; A local data store, which resides on the inspector's computer, where the current inspection's data is stored; A set of services used by all plug-ins (i.e. data transformation, authentication, replication services etc.). This architecture allows for incremental development and extension of the software with plug-ins that support individual inspection activities. The core set of components along with the framework, the Inventory Verification, Book Examination and Records and Reports Comparison plug-ins have been developed. The development of the Short Notice Random

  12. 7 CFR 205.403 - On-site inspections.

    Science.gov (United States)

    2010-01-01

    ..., Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE (CONTINUED) ORGANIC FOODS PRODUCTION ACT PROVISIONS NATIONAL ORGANIC PROGRAM Certification § 205.403 On-site inspections. (a) On-site inspections. (1... site that produces or handles organic products and that is included in an operation for which...

  13. 48 CFR 46.301 - Contractor inspection requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor inspection... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.301 Contractor inspection requirements. The contracting officer shall insert the clause at 52.246-1, Contractor Inspection Requirements, in solicitations...

  14. Experimental Stress Analysis at Railway Inspection Pit

    Directory of Open Access Journals (Sweden)

    Nicuşor Laurentiu Zaharia

    2008-10-01

    Full Text Available Railway inspection pits are used in railway halls. The purpose of inspection pits is to allow the working under the vehicle. Inspection pits can be found in locomotive depots, factories etc. The new design for a inspection pit in a railway hall involve tests in purpose of homologations the railway infrastructure. Before the homologation committee meeting, tests are made; after the test, a testing report is made which it will be part at homologation documents.

  15. Do OSHA Inspections Reduce Injuries? A Panel Analysis

    OpenAIRE

    Wayne B. Gray; John T. Scholz

    1991-01-01

    Using data on injuries and OSHA inspections for 6,842 large manufacturing plants between 1979 and 1985, we find evidence that OSHA inspections significantly reduce injuries. This effect comes exclusively from inspections that impose penalties, inspections which do not impose penalties appear to have no effect on injuries. Plants which are inspected (and penalized) in a given year experience a 22 percent decline in their injuries during the following few years. In our sample, total OSHA enforc...

  16. Hospital Inspections

    Data.gov (United States)

    U.S. Department of Health & Human Services — Welcome to hospitalinspections.org, a website run by the Association of Health Care Journalists (AHCJ) that aims to make federal hospital inspection reports easier...

  17. Mechanized inspection of steam generator components during manufacture

    International Nuclear Information System (INIS)

    Otte, H.-J.; Leupoldt, K.; Meister, W.

    2009-01-01

    Steam Generator (SG) parts are intensively inspected by UT in the course of the manufacturing process. These inspections - mostly performed manually using different codes - are time consuming and call for a sophisticated documentation, figuring part of the life time documentation package. In order to reduce time and costs mechanized inspection equipment is introduced, combining short inspection times, avoiding influence of the human factor and providing proper electronic storage of all inspection results prepared for comparison with data generated during in-service inspection. Since 2001 Cegelec delivered various UT systems for gas turbine disks and rotor ends called SIRO-MAN. Within only a few years the majority of important providers of such components successfully switched from manual inspection to mechanized inspection following the requirements of manufacturers like ALSTOM, GE and Siemens. The SIRO-MAN is now adapted to the needs of mechanized inspection of SG components. The inspection is performed on the products during rotation around the vertical axis. The multi - probe assemblies are manoeuvred on the products by a manipulator system backed by a NC control unit. Acoustic coupling of UT probes to the product surface is performed with oil or water in a closed circuit. UT and - if requested ET - data along with position information of the probe assembly provided by the control unit are acquired, processed and evaluated by an UT / ET electronic system delivered by either Olympus or ZETEC. As performed already on rotor ends a sequence of inspections using different parameter settings can be programmed with simple means (Teach In) so that such inspection sequence can be executed without operating personnel. Probe assemblies allow for individual operation of probes out of the probe assembly according to the individual needs. Conventional UT and phased array applications or combination of both techniques can be provided. The UT / ET electronic equipment offers

  18. Visual inspection. Better than your eyes

    International Nuclear Information System (INIS)

    Jakobs, N.; Baumgartl, R.

    2005-01-01

    Ongoing improvements in the development of camera technologies and manipulator techniques permit an enhanced performance of inspection tasks in nuclear services. In areas of reduced dose rate it's possible to use small size high resolution CCD cameras instead of tube cameras. Underwater inspections may be performed by submarine instead of rigid manipulator systems. This allows the enlargement of inspection areas and the performance at reduced time and personnel dose rate. (author)

  19. Modelling inspection policies for building maintenance.

    Science.gov (United States)

    Christer, A H

    1982-08-01

    A method of assessing the potential of an inspection maintenance policy as opposed to an existing breakdown maintenance policy for a building complex is developed. The method is based upon information likely to be available and specific subjective assessments which could be made available. Estimates of the expected number of defects identified at an inspection and the consequential cost saving are presented as functions of the inspection frequency.

  20. 7 CFR 29.57 - Where inspection is offered.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 2 2010-01-01 2010-01-01 false Where inspection is offered. 29.57 Section 29.57... REGULATIONS TOBACCO INSPECTION Regulations Permissive Inspection § 29.57 Where inspection is offered. Tobacco..., samplers, or weighers are available and the tobacco is offered under conditions that permit of its proper...

  1. Dungeness 'A' Nuclear Power Station. The findings of NII's assessment of Nuclear Electric's long term safety review

    International Nuclear Information System (INIS)

    1994-01-01

    The assessment is reported of Nuclear Electrics' Long Term Safety Reviews (LTSR) of the Dungeness A magnox reactors. The assessment was undertaken by the Health and Safety Executive's Nuclear Installations Inspectorate (NII) which is responsible for regulating the safety of nuclear installations in the United Kingdom. This was one of a programme of LTSRs for all the UK magnox reactors. The LTSR for each plant was proceeded by a Generic Issues programme. The results of both the LTSR and the Generic Issues programme have been used by NII in forming the conclusions of this assessment. Overall the safety case for Dungeness A is satisfactory for continued operation. A programme of additional modifications and inspections has been put in place which further enhances the safety justification. Reactor operations will continue to be monitored and regulated in accordance with the inspections required under the licensing arrangements. Provided these requirements and the agreed further analysis, improvements and inspections give satisfactory results it is expected that the station will be able to operate safely till each reactor is at least 30 years old. Beyond this point a further Periodic Safety Review will be required. (UK)

  2. Optimizing pre-service inspection data

    International Nuclear Information System (INIS)

    Mullins, L.E.; Harrison, J.M.

    1986-01-01

    The phenomenon of intergranular stress corrosion cracking (IGSCC) in nuclear power plant piping systems has been the single biggest factor in an evolution that has changed and continues to change in-service inspection practices and philosophy throughout the industry. In-service inspection has been found to deal with several distinct phases of the problem. At the onset, existing technology was demonstrated to be unable to detect IGSCC adequately. This inability to detect IGSCC was soon overcome. However, it immediately pointed out the difficulties associated with the discrimination between IGSCC and other harmless metallurgical conditions. On the heels of detection and discrimination came problems associated with determining crack size and the monitoring of overlayed flaws. A wealth of information has been written on all phases of IGSCC; however, one particular aspect has as of yet seen little attention. With an increasing number of plants choosing to replace flawed pipe, the pre-service inspection of the replaced piping demands increased attention. The lessons learned through inspection for IGSCC need again to be applied to the replacement piping. Through increased attention at installation, many of the difficulties associated with proper inservice inspection may be reduced or eliminated, thereby realizing an economy in outage scheduling, personnel exposure, and, overall, a more reliable in-service examination

  3. Inservice inspection of Halden BWR pressure vessel

    International Nuclear Information System (INIS)

    Foerli, O.; Hernes, T.

    1978-01-01

    A description is given of how the recertification inspection of the 20 years old Halden Reactor pressure vessel was carried out in accordance with the latest ASME-CODES, despite the fact that inspection accessibility was poor. As no volumetric inspection had been carried out since the preservice radiography in 1957, the ultrasonic inspection included the high flux region of all welds. In total 70% of longitudinal welds and 20% of bottom circumferential welds were inspected as well as the bottom nozzle connection. The vessel was not designed with provisions for inservice inspection, the welds are unaccessible from the outside and removal of the lid is virtually impossible. The ultrasonic probes could only be loaded through 77 mm diameter holes in the top lid and remotely positioned inside the vessel. The inspection was performed using 450C and 60OC 1 MHz angle probes and 2.25 MHz normal probes in immersion technique. In a zone around the welds, small regions with lack of bonding between the stainless steel cladding and the boiler steel were revealed. One root defect known and accepted from the preservice radiographs was examined. The defect was found to be 6x30mm as a maximum and well within acceptable limits according to the fracture mechanics analysis method recommended in ASME X1. The inspection required a period of three weeks' work in the reactor hall. (UK)

  4. Massively parallel E-beam inspection: enabling next-generation patterned defect inspection for wafer and mask manufacturing

    Science.gov (United States)

    Malloy, Matt; Thiel, Brad; Bunday, Benjamin D.; Wurm, Stefan; Mukhtar, Maseeh; Quoi, Kathy; Kemen, Thomas; Zeidler, Dirk; Eberle, Anna Lena; Garbowski, Tomasz; Dellemann, Gregor; Peters, Jan Hendrik

    2015-03-01

    SEMATECH aims to identify and enable disruptive technologies to meet the ever-increasing demands of semiconductor high volume manufacturing (HVM). As such, a program was initiated in 2012 focused on high-speed e-beam defect inspection as a complement, and eventual successor, to bright field optical patterned defect inspection [1]. The primary goal is to enable a new technology to overcome the key gaps that are limiting modern day inspection in the fab; primarily, throughput and sensitivity to detect ultra-small critical defects. The program specifically targets revolutionary solutions based on massively parallel e-beam technologies, as opposed to incremental improvements to existing e-beam and optical inspection platforms. Wafer inspection is the primary target, but attention is also being paid to next generation mask inspection. During the first phase of the multi-year program multiple technologies were reviewed, a down-selection was made to the top candidates, and evaluations began on proof of concept systems. A champion technology has been selected and as of late 2014 the program has begun to move into the core technology maturation phase in order to enable eventual commercialization of an HVM system. Performance data from early proof of concept systems will be shown along with roadmaps to achieving HVM performance. SEMATECH's vision for moving from early-stage development to commercialization will be shown, including plans for development with industry leading technology providers.

  5. Quality control for the construction of Ikata Nuclear Power Station No. 2 Unit

    International Nuclear Information System (INIS)

    Onishi, Akiyoshi

    1983-01-01

    In the construction of No. 2 unit in Ikata Nuclear Power Station, Shikoku Electric Power Co., the quality control was practiced making effective use of the experience in preceding stations including the Three Mile Island station, U.S., and improving those. The construction works were also performed in consideration of ensuring the safe running of No. 1 unit in commercial operation. In this report, first the outline of No. 2 unit facility and the quality control in the construction processes are described sequentially. For the comprehensive quality control activity over a series of plant design, manufacturing, installation and commissioning processes, the quality control policy was fixed, the system was established, the plan was prepared, and the quality control was promoted as planned and systematically. The outline of the quality control in each stage is described as follows. Design stage: It was implemented for the confirmation of applicable standards and references, the management of drawings submitted for approval, the selection of materials used, the coordination among sub-contractors, design change and the reflection of experience in preceding stations. Manufacturing stage. It was performed for material control, manufacturing management, factory test and control. Installation stage. It was practiced for the management of installation works, the inspection during the installation, and the check-up and control after the installation. Several quality control items were implemented also in the method of construction works and construction management. (Wakatsuki, Y.)

  6. Quality assurance inspections for shipping and storage containers

    Energy Technology Data Exchange (ETDEWEB)

    Stromberg, H.M.; Roberts, G.D.; Bryce, J.H. [Lockheed Idaho Technologies Co., Idaho Falls, ID (United States)

    1996-04-01

    This is a guide for conducting quality assurance inspections of transportation packaging and dry spent fuel storage system suppliers. (Suppliers are defined as designers, fabricators, distributors, users or owners of those packaging and storage systems.) This guide may be used during inspection to determine regulatory compliance with 10 CFR, Part 71, Subpart H; 10 CFR, Part 72, Subpart G; 10 CFR, Part 21; and supplier`s quality assurance program commitments. It was developed to provide a structured, consistent approach to inspections. The guidance therein provides a framework for evaluation of transportation packaging and dry spent fuel storage systems quality assurance programs. Inspectors are provided with the flexibility to adapt the methods and concepts to meet inspection requirements for the particular facility. The method used in the guide treats each activity at a facility as a separate performance element and combines the activities within the framework of an ``inspection tree.``The method separates each performance element into several areas for inspection and identifies guidelines, based on regulatory requirements, to qualitatively evaluate each area. This guide also serves as a field manual to facilitate quality assurance inspection activities. This guide replaces an earlier one, NUREG/CR-5717 (Packing Supplier Inspection Guide). This replacement guide enhances the inspection activities for transportation packagings and adds the dry spent fuel storage system quality assurance inspection activities.

  7. Quality assurance inspections for shipping and storage containers

    International Nuclear Information System (INIS)

    Stromberg, H.M.; Roberts, G.D.; Bryce, J.H.

    1996-04-01

    This is a guide for conducting quality assurance inspections of transportation packaging and dry spent fuel storage system suppliers. (Suppliers are defined as designers, fabricators, distributors, users or owners of those packaging and storage systems.) This guide may be used during inspection to determine regulatory compliance with 10 CFR, Part 71, Subpart H; 10 CFR, Part 72, Subpart G; 10 CFR, Part 21; and supplier's quality assurance program commitments. It was developed to provide a structured, consistent approach to inspections. The guidance therein provides a framework for evaluation of transportation packaging and dry spent fuel storage systems quality assurance programs. Inspectors are provided with the flexibility to adapt the methods and concepts to meet inspection requirements for the particular facility. The method used in the guide treats each activity at a facility as a separate performance element and combines the activities within the framework of an ''inspection tree.''The method separates each performance element into several areas for inspection and identifies guidelines, based on regulatory requirements, to qualitatively evaluate each area. This guide also serves as a field manual to facilitate quality assurance inspection activities. This guide replaces an earlier one, NUREG/CR-5717 (Packing Supplier Inspection Guide). This replacement guide enhances the inspection activities for transportation packagings and adds the dry spent fuel storage system quality assurance inspection activities

  8. ENIQ: European Network for Inspection Qualification

    International Nuclear Information System (INIS)

    Champigny, F.; Crutzen, S.; Lemaitre, P.

    1995-01-01

    Many countries are currently considering their own approach to inspection qualification and are carefully assessing experience to date. ENIQ, which stands for European Network for Inspection Qualification, groups the major part of the utilities in Western Europe. The general objective of ENIQ is to coordinate and manage at European level expertise and resources for the assessment and qualification of NDE inspection techniques and procedures, primarily for nuclear components. Also non-nuclear heavy duty components will be considered. Within ENIQ there is a growing consensus of opinion on the general principles of a European approach towards inspection qualification. In this paper the main activities, organization and actual status of ENIQ will be discussed

  9. NRC program of inspection and enforcement

    International Nuclear Information System (INIS)

    LeDoux, J.C.; Rehfuss, C.

    1978-01-01

    The Nuclear Regulatory Commission (NRC) regulates civilian uses of nuclear materials to ensure the protection of the public health and safety and the environment. The Office of Inspection and Enforcement (IE) develops and implements the inspection, investigation, and enforcement programs for the NRC. The IE conducts inspection programs for reactors under construction and in operation, nuclear industry vendors, fuel facilities and users of nuclear materials, and all aspects of the safeguarding of facilities and materials. Recently the IE began implementing a program that will place inspectors on site at nuclear power reactors and will provide for national appraisal of licensee performance and for an evaluation of the effectiveness of the inspection programs

  10. Optimal allocation of international atomic energy agency inspection resources

    International Nuclear Information System (INIS)

    Markin, J.T.

    1987-01-01

    Each year the Department of Safeguards of the International Atomic Energy Agency (IAEA) conducts inspections to confirm that nuclear materials and facilities are employed for peaceful purposes. Because of limited inspection resources, however, the IAEA cannot fully attain its safeguards goals either quantitatively as measured by the inspection effort negotiated in the facility attachments or qualitatively as measured by the IAEA criteria for evaluating attainment of safeguards goals. Under current IAEA procedures the allocation of inspection resources assigns essentially equal inspection effort to facilities of the same type. An alternative approach would incorporate consideration of all material categories and facilities to be assigned inspection resources when allocating effort to a particular facility. One such method for allocating inspection resources is based on the IAEA criteria. The criteria provide a framework for allocating inspection effort that includes a ranking of material types according to their safeguards importance, an implicit definition of inspection activities for each material and facility type, and criteria for judging the attainment of safeguards goals in terms of the quality and frequency of these inspection activities. This framework is applicable to resource allocation for an arbitrary group of facilities such as a state's fuel cycle, the facilities inspected by an operations division, or all of the facilities inspected by the IAEA

  11. Machine vision systems using machine learning for industrial product inspection

    Science.gov (United States)

    Lu, Yi; Chen, Tie Q.; Chen, Jie; Zhang, Jian; Tisler, Anthony

    2002-02-01

    Machine vision inspection requires efficient processing time and accurate results. In this paper, we present a machine vision inspection architecture, SMV (Smart Machine Vision). SMV decomposes a machine vision inspection problem into two stages, Learning Inspection Features (LIF), and On-Line Inspection (OLI). The LIF is designed to learn visual inspection features from design data and/or from inspection products. During the OLI stage, the inspection system uses the knowledge learnt by the LIF component to inspect the visual features of products. In this paper we will present two machine vision inspection systems developed under the SMV architecture for two different types of products, Printed Circuit Board (PCB) and Vacuum Florescent Displaying (VFD) boards. In the VFD board inspection system, the LIF component learns inspection features from a VFD board and its displaying patterns. In the PCB board inspection system, the LIF learns the inspection features from the CAD file of a PCB board. In both systems, the LIF component also incorporates interactive learning to make the inspection system more powerful and efficient. The VFD system has been deployed successfully in three different manufacturing companies and the PCB inspection system is the process of being deployed in a manufacturing plant.

  12. MTR fuel inspection at CERCA

    International Nuclear Information System (INIS)

    Fanjas, Y.

    1992-01-01

    The stringent specifications for MTR fuel plates and fuel elements require various sophisticated inspection techniques. In particular, the development of low enriched silicide fuels made it necessary to adapt these techniques to high density plates. This paper presents the status of inspection technology at CERCA. (author)

  13. 7 CFR 946.60 - Inspection and certification.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Inspection and certification. 946.60 Section 946.60... WASHINGTON Order Regulating Handling Inspection and Certification § 946.60 Inspection and certification. (a... this subpart, each handler who first ships potatoes shall, prior to making shipment, cause each...

  14. Optical inspection techniques for security instrumentation

    Science.gov (United States)

    van Renesse, Rudolf L.

    1996-03-01

    This paper reviews four optical inspection systems, in which development TNO Institute of Applied Physics was involved: (1) intaglio scanning and recognition, (2) banknote quality inspection, (3) visualization and reading of a finger pattern, and (4) 3DAS authentication. (1) Intaglio is reserved for high security printing. It renders a tactile relief that can be recognized by a laser scanning technique. This technique is applied by various national banks to detect counterfeit banknotes returning from circulation. A new system is proposed that will detect intaglio on arbitrary wrinkled banknotes. (2) A banknote fitness inspection system (BFIS) that inspects banknotes in specularly reflected light is described. As modern banknotes are provided increasingly with reflective security foils, a new system is proposed that inspects banknotes in specular and diffuse reflection, as well as in transmission. (3) An alternative visualization method for visualization of finger patterns is described, employing a reflective elastomer. A CD scanning system reads the finger patterns. (4) A nonwoven structure has two advantageous properties for card authentication: a random structure which renders each few square millimeters of the pattern uniqueness (identification) and a 3D structure which makes it virtually impossible to be counterfeited (authentication). Both properties are inspected by an extremely simple lenseless reader.

  15. Strategies to reduce PWR inspection time

    International Nuclear Information System (INIS)

    Guerra, J.; Gonzalez, E.

    2001-01-01

    During last few years, a constant reduction in inspection time was clearly demanded by most nuclear plant owners. This requirement has to be accomplished without any impact in inspection quality that, in general, has also to be improved. All this in a market with increasing competition that forces price reductions. Under these new demands from our customers, Tecnatom reoriented its development efforts to improve his products and services to meet this challenges. Two of our main inspection activities that have clear impact in outage duration are Steam Generator and Vessel inspections. This paper describes the improvements made in these two activities as an example of the reorientation of our development efforts with a focus on the technical improvements made on the software and robotic tools applied as in the data acquisition and analysis systems. In the Steam Generator inspections, new robots with dual guide tubes are commonly used. New eddy current instruments and software were developed to keep up with the data rates produced by the faster acquisition system. Use of automatic analysis software is also helping to improve speed while reducing cost and improving overall job quality. Production rates are close to double from the previous inspection system. (author)

  16. Conceptual design for transmission line inspection robot

    International Nuclear Information System (INIS)

    Jalal, M F Abdul; Sahari, K S Mohamed; Anuar, A; Arshad, A D Mohd; Idris, M S

    2013-01-01

    Power transmission line is used for power distribution purposes due to their cost effective measure compared to underlying cable. However, prolonged exposure to natural weather may cause fatigue stress to the lines as well as induce material failure. Therefore, periodical line inspection is considered uttermost important as a preventive measure to avoid power outage. However, transmission line inspection has always been a high risk and expensive work. Hazardous works that may harm operator as well as routine that requires precise handling can be performed by robots. Various types of robots have been designed and developed for line inspection but only perform well on a straight and continuous line. As these robots encounter an obstacle during the inspection, then the real problem in terms of robot stability and smooth operation arises. In this paper, conceptual design and evaluation for transmission line inspection robot is presented. The inspection robot mobile robot must be able to bypass or avoid obstacles as it travels along the power transmission line.

  17. Incore inspection and repairing device

    International Nuclear Information System (INIS)

    Ito, Arata; Kimura, Motohiko

    1998-01-01

    The present invention provides a device for inspecting and repairing the inside of a reactor container even if it is narrow, with no trouble by using a swimming-type operation robot. Namely, the device of the present invention conducts inspection and repairing operations for the inside of the reactor by introducing a swimming type operation robot into the reactor container. The swimming-type operation robot comprises a robot main body having a propeller, a balancer operably disposed to the robot main body and an inspection and repairing unit attached detachable to the balancer. In the device of the present invention, since the inspection and preparing unit is attached detachably to the swimming robot, a robot which transports tools is formed as a standard product. As a result, the production cost can be reduced, and the reliability of products can be improved. Appropriate operations can be conducted by using best tools. (I.S.)

  18. FAA Fluorescent Penetrant Laboratory Inspections

    Energy Technology Data Exchange (ETDEWEB)

    WINDES,CONNOR L.; MOORE,DAVID G.

    2000-08-02

    The Federal Aviation Administration Airworthiness Assurance NDI Validation Center currently assesses the capability of various non-destructive inspection (NDI) methods used for analyzing aircraft components. The focus of one such exercise is to evaluate the sensitivity of fluorescent liquid penetrant inspection. A baseline procedure using the water-washable fluorescent penetrant method defines a foundation for comparing the brightness of low cycle fatigue cracks in titanium test panels. The analysis of deviations in the baseline procedure will determine an acceptable range of operation for the steps in the inspection process. The data also gives insight into the depth of each crack and which step(s) of the inspection process most affect penetrant sensitivities. A set of six low cycle fatigue cracks produced in 6.35-mm thick Ti-6Al-4V specimens was used to conduct the experiments to produce sensitivity data. The results will document the consistency of the crack readings and compare previous experiments to find the best parameters for water-washable penetrant.

  19. Ultrasonic inspection of austenitic welds

    Energy Technology Data Exchange (ETDEWEB)

    Tomlinson, J R; Wagg, A R; Whittle, M J [N.D.T. Applications Centre, CEGB, Manchester (United Kingdom)

    1980-11-01

    The metallurgical structure of austenitic welds is described and contrasted with that found in ferritic welds. It is shown that this structure imparts a marked elastic anisotropy in the ultrasonic propagation parameters. Measurements of variations in the apparent attenuation of sound and deviations in the beam direction are described. The measurements are interpreted in terms of the measured velocity anisotropy. Two applications of the fundamental work are described. In the first it is shown how, by using short pulse compression wave probes, and with major modification of the welding procedure, a stainless steel fillet weld in an AGR boiler can be inspected. In the second application, alternative designs of a transition butt weld have been compared for ease of ultrasonic inspection. The effects of two different welding processes on such an inspection are described. Finally, the paper examines the prospects for future development of inspection and defect-sizing techniques for austenitic welds. (author)

  20. Application of corrosion screening tools for riser inspection

    International Nuclear Information System (INIS)

    Zamir Mohamed Daud; Vijayan, S.

    2003-01-01

    As offshore facilities approach the end of their design life, owners would like to assess the condition and integrity of plant and equipment. Detailed inspection, including non-destructive testing (NDT), are implemented and results are utilised for predictive maintenance and estimating useful remaining life. Except for risk based inspection, the extent of surface coverage required would be more compared to inspection of pre-determined spots. Risers, for example, usually have several layers of coating that prevent use of conventional techniques for inspection of corrosion. Complete coverage requires access (including removal coatings and insulation). Inspection utilising the conventional NDT tools can be very slow and expensive. However, recent advances have forwarded the use of specialised NDT techniques that were developed for inspection of corrosion under insulation (CUI). This paper details two screening inspection tools, LIXI Profiler and RTD-INCOTEST that have been applied to inspection of risers. LIXI Profiler is based on attenuation of penetrating radiation by materials, and RTD-INCOTEST is based on decay of pulsed eddy current in materials. (Author)

  1. 9 CFR 307.5 - Overtime and holiday inspection service.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Overtime and holiday inspection... INSPECTION AND CERTIFICATION FACILITIES FOR INSPECTION § 307.5 Overtime and holiday inspection service. (a..., at the rate specified in § 391.3, for the cost of the inspection service furnished on any holiday as...

  2. 9 CFR 590.925 - Inspection of imported egg products.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Inspection of imported egg products... AGRICULTURE EGG PRODUCTS INSPECTION INSPECTION OF EGGS AND EGG PRODUCTS (EGG PRODUCTS INSPECTION ACT) Imports § 590.925 Inspection of imported egg products. (a) Except as provided in § 590.960, egg products offered...

  3. Savannah River Plant waste tank inspection manual

    International Nuclear Information System (INIS)

    McNatt, F.G.

    1979-01-01

    This manual is to aid in making visual and photographic inspections and steel thickness measurements of Building 241-F and -H underground waste storage tanks. It describes the inspection program, the storage tanks, the equipment and techniques used and the results of their application, and the inspection recordkeeping methods

  4. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1990-10-01

    A fundamental premise of the Nuclear Regulatory Commission's (NRC) licensing and inspection program is that licensees are responsible for the proper construction and safe and efficient operation of their nuclear power plants. The total government-industry system for the inspection of commercial nuclear facilities has been designed to provide for multiple levels of inspection and verification. Licensees, contractors, and vendors each participate in a quality verification process in compliance with requirements prescribed by the NRC's rules and regulations (Title 10 Code of Federal Regulations). The NRC performs an overview of the commercial nuclear industry by inspection to determine whether its requirements are being met by licensees and their contractors, while the major inspection effort is performed by the industry within the framework of ongoing quality verification programs

  5. 7 CFR 330.105 - Inspection.

    Science.gov (United States)

    2010-01-01

    ... inspector notifies the Customs authorities should be held for inspection shall be released by Customs... be handled in accordance with the joint customs and postal regulations for inspecting and handling... of Customs for the release by Customs officers on behalf of the inspector of any class of means of...

  6. Operation of inspection data acquisition and evaluation system

    International Nuclear Information System (INIS)

    Takahashi, Yoichi; Harada, Hiroshi; Watanabe, Masayuki; Sakaguchi, Makoto; Ishikawa, Masayuki

    2016-01-01

    Rokkasho Reprocessing Plant (RRP) is a large scale plant to treat a huge amount of Plutonium significant for safeguards. The LArge SCAle Reprocessing plant safeguards (LASCAR) Forum recommended an effective utilization of unattended verification systems and automated data acquisition system etc. Based on LASCAR recommendation, Nuclear Material Control Center (NMCC) has developed the inspection data acquisition system as the automated data acquisition system from the unattended verification systems (including non-destructive assay equipment, solution monitoring system and surveillance camera). The data gathered from the unattended verification system are provided to the inspection data evaluation system for the State and the IAEA. In this development, redundancy concepts for data transfer line, in order to prevent inspection data missing, were introduced, and the timely confirmation of solution behaver such as material flows and inventories by the solution monitoring can be achieved. Furthermore, for purpose of efficiency of evaluation of inspection activity for the State, NMCC has developed the inspection data evaluation system which operates automated partition of inspection data coming from each verification equipment. Additionally, the inspection data system evaluation can manage the inspection activities and their efforts. These development and operation have been funded by JSGO (Japan Safeguards Office). This paper describes development history and operation of the inspection data acquisition and evaluation system. (author)

  7. Inspection qualification and implementation of ENIQ in Sweden

    International Nuclear Information System (INIS)

    Zettervall, Tommy

    2013-01-01

    Many countries are currently considering their approaches to inspection qualification and risk-informed in-service inspection (RI-ISI) and are carefully assessing experience data. In Europe most of the utilities operating nuclear power plants have joined together to form the European Network for Inspection Qualification ENIQ. In practice, qualification can be performed with varying degrees of complexity and cost, varying from capability statement based on existing evidence, through to an extensive qualification consisting of a detailed Technical Justification (TJ) together with open and blind trials on full-scale test blocks. An Inspection Qualification is an investigation and demonstration, which confirm that an inspection system has the ability to solve its specific tasks. The qualification is a Quality Assurance of an inspection system based on documents and practical trials. A reliable inspection system, based on a reliable qualification and correct prerequisites, will reduce total costs for Licensees and increase the credibility of the inspection result. To get such inspection system, which could be valid for many years, it's of necessity to fulfil all included parts in the process. It begins with the Technical Specification from Licensee, where input data and requirements about the actual component are specified. To get an inspection system that could live over time, the Technical Justification is of importance. Finally the test blocks and used simulation techniques play an important part of the final result, and these test blocks together with TJ form the basis for qualification body's decision. (author)

  8. 21 CFR 1316.08 - Consent to inspection.

    Science.gov (United States)

    2010-04-01

    ... constitutional right not to have an administrative inspection made without an administrative inspection warrant; (2) That he has right to refuse to consent to such an inspection; (3) That anything of an incriminating nature which may be found may be seized and used against him in a criminal prosecution; (4) That...

  9. 47 CFR 80.953 - Inspection and certification.

    Science.gov (United States)

    2010-10-01

    ... date on which it is placed in service. (b) An inspection and certification of a ship subject to the... must be recorded in the ship's radiotelephone log and include: (1) The date the inspection was... part and has successfully passed the inspection. (c) The vessel owner, operator, or ship's master must...

  10. Periodic inspections of the primary system

    International Nuclear Information System (INIS)

    Dufour, L.B.

    1978-01-01

    An impression is given of the inspection techniques, preparations and background for periodic examinations of the primary system of the Dodewaard Nuclear Reactor over the past 10 years. Unfortunately reliable integral inspection techniques to enable 'listening-in' to developing faults, are not yet available. Until they are, inspections will continue to be executed from a distance using different continuous methods, often under water and with a shortage of space and in the presence of ionising radiations. (C.F.)

  11. 49 CFR 213.365 - Visual inspections.

    Science.gov (United States)

    2010-10-01

    ... initiate remedial action. (e) Each switch, turnout, track crossing, and lift rail assemblies on moveable bridges shall be inspected on foot at least weekly. The inspection shall be accomplished in accordance...

  12. 9 CFR 590.128 - Holiday inspection service.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Holiday inspection service. 590.128... of Service § 590.128 Holiday inspection service. (a) When an official plant requires inspection service on a holiday or a day designated in lieu of a holiday, such service is considered holiday work...

  13. 49 CFR 1548.3 - TSA inspection authority.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false TSA inspection authority. 1548.3 Section 1548.3..., DEPARTMENT OF HOMELAND SECURITY CIVIL AVIATION SECURITY INDIRECT AIR CARRIER SECURITY § 1548.3 TSA inspection authority. (a) Each indirect air carrier must allow TSA, at any time or place, to make any inspections or...

  14. Experience of remote under water handling operations at Tarapur Atomic Power Station

    International Nuclear Information System (INIS)

    Agarwal, S.K.

    1990-01-01

    Each Refuelling outage of Tarapur Atomic Power Station Reactors involves a great deal of remote underwater handling operations using special remote handling tools, working deep down in the reactor vessel under about sixty feet of water and in the narrow confines of highly radioactive core. The remote underwater handling operations include incore and out of core sipping operations, fuel reloading or shuffling, uncoupling of control rod drives, replacement and shuffling of control blades, replacement of local power range monitors, spent fuel shipment in casks, retrieval of fallen or displaced fuel top guide spacers, orifices and their installation, underwater CCTV inspection of reactor internals, core verification, channelling and dechannelling of fuel bundles, inspection of fuel bundles and channels, unbolting and removal of old racks, installation of high density racks, removal and reinstallation of fuel support plugs and guide tubes, underwater cutting of irradiated hardware material and their disposal, fuel reconstitution, removal and reinstallation of system dryer separator etc.. The paper describes in brief the salient experience of remote underwater handling operations at TAPS especially the unusual problems faced and solved, by using special tools, employing specific techniques and by repeated efforts, patience, ingenuity and skills. (author). 10 figs

  15. On automatic visual inspection of reflective surfaces

    DEFF Research Database (Denmark)

    Kulmann, Lionel

    1995-01-01

    surfaces, providing new and exciting applications subject to automated visual inspection. Several contextual features have been surveyed along with introduction of novel methods to perform data-dependent enhancement of local surface appearance . Morphological methods have been described and utilized......This thesis descrbes different methods to perform automatic visual inspection of reflective manufactured products, with the aim of increasing productivity, reduce cost and improve the quality level of the production. We investigate two different systems performing automatic visual inspection....... The first is the inspection of highly reflective aluminum sheets, used by the Danish company Bang & Olufsen, as a part of the exterior design and general appearance of their audio and video products. The second is the inspection of IBM hard disk read/write heads for defects during manufacturing. We have...

  16. School Nurse Inspections Improve Handwashing Supplies

    Science.gov (United States)

    Ramos, Mary M.; Schrader, Ronald; Trujillo, Rebecca; Blea, Mary; Greenberg, Cynthia

    2013-01-01

    BACKGROUND Handwashing in the school setting is important for infectious disease control, yet maintaining adequate handwashing supplies is often made difficult by lack of funds, limited staff time, and student vandalism. This study measured the availability of handwashing supplies for students in New Mexico public schools and determined the impact of scheduled school nurse inspections on the availability of handwashing supplies. METHODS Participating school districts in New Mexico were matched by size and randomized into intervention and control groups. Baseline inspections were conducted in November 2008 followed by 2 subsequent bimonthly inspections. For each student bathroom, the presence or absence of soap and either paper towels or hand dryers was indicated on an inspection checklist. The intervention group reported findings to the New Mexico Department of Health (NMDOH) and to school administrative and custodial staff requesting that any identified problems be addressed. The control group reported inspection findings to the NMDOH only. Descriptive analyses were conducted to determine the proportion of bathrooms with soap and either paper towels or hand dryers. Comparisons were made between the intervention schools and the control schools at baseline and during the intervention period. RESULTS The intervention group had significantly higher probability of bathrooms being supplied with soap (p school nurse inspections of hand hygiene supplies, with reporting to appropriate school officials, can improve the availability of handwashing supplies for students. PMID:21592131

  17. Regulatory inspection activities related to inspection planning, plant maintenance and assessment of safety. Proceedings of an international workshop

    International Nuclear Information System (INIS)

    Van Binnebeek, J.J.; Aubrey, Richard; Grandame, Melvyn; Aro, Ilari; Balloffet, Yves; Klonk, Hartmut; Manzella, Pietro; Koizumi, Hiroyoshi; Bouvrie, E.C. des; Forsberg, Staffan; Lang, Hans-Guenter; Mehew, Robert; Warren, Thomas; Woodhouse, Paul; Gallo, Robert M.; Campbell, Rob; )

    1997-01-01

    The NEA Committee on Nuclear Regulatory Activities (CNRA) believes that an essential factor in ensuring the safety of nuclear installations is the continuing exchange and analysis of technical information and data. To facilitate this exchange the Committee has established Working Groups and Groups of Experts in specialised topics. CNRA believes that safety inspections are a major element in the regulatory authority's efforts to ensure the safe operation of nuclear facilities. Considering the importance of these issues, the Committee has established a special Working Group on Inspection Practices (WGIP). The purpose of WGIP, is to facilitate the exchange of information and experience related to regulatory safety inspections between CNRA Member countries. This was the 3. international workshop held by the WGIP on regulatory inspection activities. The focus of this workshop was on 3 main topics; Inspection Planning, Plant Maintenance and Assessment of Safety. This document presents the proceedings from the workshop, including: workshop programme, results and conclusions, papers and presentations and the list of participants. The main purpose of the Workshop is to provide a forum of exchange of information on the regulatory inspection activities

  18. Regulatory inspection activities related to inspection planning, plant maintenance and assessment of safety. Proceedings of an international workshop

    Energy Technology Data Exchange (ETDEWEB)

    Van Binnebeek, J. J. [AIB-Vincotte Nuclear - AVN, Avenue du Roi, 157, B-1060 Brussels (Belgium); Aubrey, Richard; Grandame, Melvyn [Atomic Energy Control Board - AECB, P.O. Box 1046, Station B, 280 Slater Street, Ottawa, Ontario K1P 5S9 (Canada); Aro, Ilari [Finnish Centre for Radiation and Nuclear Safety - STUK, P.O. Box 14, FIN-00881 Helsinki (Finland); Balloffet, Yves [DRIRE Rhone Alpes, 146, rue Pierre Corneille, 69426 Lyon CEDEX 03 (France); Klonk, Hartmut [Bundesamt fuer Strahlenschutz - BfS, Federal Office for Radiation Protection, Postbox 10 01 49, 38201 Salzgitter 1 (Germany); Manzella, Pietro [A.N.P.A., Via V. Brancati, 48, 1-00144 Roma EUR (Italy); Koizumi, Hiroyoshi [Tech. Stan. Dept. - JAPEIC, Shin-Toranomon Bldg., 1-5-11, Akasaka, Minato-ku, Tokyo 107 (Japan); Bouvrie, E.C. des [Ministry of Social Affairs and Employment, Nuclear Safety Dept. KFD, P.O. Box 90804, 2509 LV The Hague (Netherlands); Forsberg, Staffan [Swedish Nuclear Power Inspectorate - SKI, Klarabergsviadukten 90, S-10658 Stockholm (Sweden); Lang, Hans-Guenter [Section Plant Coordination and Inspection, Swiss Federal Nuclear Safety Inspectorate - HSK, CH-5232 Villigen-HSK (Switzerland); Mehew, Robert; Warren, Thomas; Woodhouse, Paul [Health and Safety Executive - NII, St. Peter' s House, Balliol Road, Bootle, Merseyside L20 3LZ (United Kingdom); Gallo, Robert M. [Special Inspection Branch, US Nuclear Regulatory Commission - US NRC, Mail Stop 0-9A1, Washington, DC 20555 (United States); Campbell, Rob [International Atomic Energy Agency - IAEA, P.O. Box 100, A-1400 Vienna (International Atomic Energy Agency (IAEA))

    1997-07-01

    The NEA Committee on Nuclear Regulatory Activities (CNRA) believes that an essential factor in ensuring the safety of nuclear installations is the continuing exchange and analysis of technical information and data. To facilitate this exchange the Committee has established Working Groups and Groups of Experts in specialised topics. CNRA believes that safety inspections are a major element in the regulatory authority's efforts to ensure the safe operation of nuclear facilities. Considering the importance of these issues, the Committee has established a special Working Group on Inspection Practices (WGIP). The purpose of WGIP, is to facilitate the exchange of information and experience related to regulatory safety inspections between CNRA Member countries. This was the 3. international workshop held by the WGIP on regulatory inspection activities. The focus of this workshop was on 3 main topics; Inspection Planning, Plant Maintenance and Assessment of Safety. This document presents the proceedings from the workshop, including: workshop programme, results and conclusions, papers and presentations and the list of participants. The main purpose of the Workshop is to provide a forum of exchange of information on the regulatory inspection activities.

  19. Discussion on unpacking inspection of imported civil nuclear safety equipment

    International Nuclear Information System (INIS)

    Li Chan; Zhang Wenguang; Li Maolin; Li Shixin; Jin Gang; Yao Yuan

    2014-01-01

    This paper introduces the purpose, contents, process and requirements of unpacking inspection which is the second stage of safety inspection of imported civil nuclear safety equipment, expresses review key points on application documents of unpacking inspection, processes of witness on-the-spot before unpacking inspection outside the civil nuclear facilities by the test agency, discusses understanding of unpacking inspection, supervision of manufacture, inspection prior to shipment, supervision of loading and acceptance by the unit operating civil nuclear facilities, reports on unpacking inspection. Some suggestions on reinforcing the unpacking inspection in China are concerned. (authors)

  20. Inspection of licensee - Maintenance programme and activities

    International Nuclear Information System (INIS)

    2013-01-01

    An effective maintenance programme is critical to sustained safe and reliable operation of nuclear power plants. The Working Group on Inspection Practices (WGIP) concluded that when a licensee has an effective maintenance programme, the overall operating safety of the plant is improved and the protection of public health and safety enhanced. All Regulatory Bodies (RB) consider maintenance to be an important area for oversight. Although a variety of inspection practices are being used; RB are actively monitoring licensee performance. Specifically the following conclusions were reached and commendable practices identified: - Maintenance oversight by regulators appears to be in a stable continuous improvement state. Most regulators are executing inspection oversight based on an existing regulatory framework. - The performance of a licensee's maintenance programme is recognized as important part of maintaining nuclear safety. The result of the maintenance program assessment is included in the overall performance assessment of a license. - Maintenance inspection activities are recognized as an important part of the regulatory oversight process. Inspection activities are based on the safety significance and nature of work being performed by the licensee. - The effectiveness of the maintenance inspection activities is recognized to rely on properly qualified inspectors; who are adequately supported by specialists. Training and qualification of inspectors should be based on how the RB reviews and inspects licensee maintenance programmes. - Reporting requirements are identified to provide information on the licensees maintenance programme, and to help guide inspection activities. - Performance Indicators are recognized as a useful tool for helping focus regulatory activities. Basic PI are identified and tracked by the RB, and use of PI by the licensee is monitored. - Inspections are designed to confirm that the licensee is planning and scheduling maintenance with due

  1. A probe for Eddy current inspection devices

    International Nuclear Information System (INIS)

    1974-01-01

    The invention relates to a surface probe for Eddy current inspection devices. According to the invention, said probe comprises two magnetic core windings, with their axes in parallel relationship and at right angles to the surface of the part to be inspected. This can be applied to the nondestructive inspection of reactor components [fr

  2. Airplane tire inspection by image processing techniques

    OpenAIRE

    Jovancevic , Igor; Arafat , Al; Orteu , Jean-José; Sentenac , Thierry

    2016-01-01

    International audience; In this paper, we propose a new approach to detect and inspect airplane tires. We use normalized correlation based template matching to detect tires and GrabCut segmentation method to extract them from the background. We inspect the tires condition by investigating the tire treads. Ridge based intensity profiling gives satisfying inspection results.

  3. Root Cause Investigation of the Starboard Solar Alpha Rotary Joint Anomaly on the International Space Station

    Science.gov (United States)

    Taylor, Deneen; Enriquez, Carlos; McCann, David; McFatter, Justin

    2010-01-01

    The Solar Alpha Rotary Joint (SARJ) is a single-axis pointing mechanism used to orient the solar power generating arrays relative to the sun for the International Space Station (ISS). Approximately 83 days after its on-orbit installation, one of the two SARJ mechanisms aboard the ISS began to exhibit high current draw. Later inspections via Extravehicular Activity (EVA) discovered that the case hardened steel race ring on the outboard side of the joint had extensive damage to one of its three rolling surfaces. A far-reaching investigation of the anomaly was undertaken, comprising metallurgical inspections, coupon tests, traction kinematics tests, detailed bearing measurements, and thermal and structural analyses. The investigation found that the race ring damage had been caused by high bearing edge stresses that resulted from inadequate lubrication of the rolling contact. The profile of the roller bearings and the metallurgical properties of the race ring were also found to be significant contributing factors.

  4. Terahertz Radome Inspection

    Directory of Open Access Journals (Sweden)

    Fabian Friederich

    2018-01-01

    Full Text Available Radomes protecting sensitive radar, navigational, and communications equipment of, e.g., aircraft, are strongly exposed to the environment and have to withstand harsh weather conditions and potential impacts. Besides their significance to the structural integrity of the radomes, it is often crucial to optimize the composite structures for best possible radio performance. Hence, there exists a significant interest in non-destructive testing techniques, which can be used for defect inspection of radomes in field use as well as for quality inspection during the manufacturing process. Contactless millimeter-wave and terahertz imaging techniques provide millimeter resolution and have the potential to address both application scenarios. We report on our development of a three-dimensional (3D terahertz imaging system for radome inspection during industrial manufacturing processes. The system was designed for operation within a machining center for radome manufacturing. It simultaneously gathers terahertz depth information in adjacent frequency ranges, from 70 to 110 GHz and from 110 to 170 GHz by combining two frequency modulated continuous-wave terahertz sensing units into a single measurement device. Results from spiraliform image acquisition of a radome test sample demonstrate the successful integration of the measurement system.

  5. Preventing violence : service station employer handbook

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    According to part 3 of British Columbia's Workers Compensation Act, employers must ensure the health and safety of their employees and any other workers present at their worksite. Workers are also responsible for following established safe work procedures and protecting their own health and safety. This handbook was designed for service station employers who do not already have adequate violence-prevention procedures. In addition to providing guidelines, it describes employment standards for workplace health and safety. It describes general duties of supervisors, owners and suppliers and includes the forms needed to fill out, notably an inspection list; an action plan; a violent incident report for workers to fill out in the event of a violent incident; a suspect and vehicle identification form; an employer incident investigation report; and a safety and security feedback report for workers. Regulations that relate to young and new worker orientation and training were also provided along with regulations for working alone or in isolation, violence in the workplace, and high-visibility apparel.

  6. Machine vision inspection of railroad track

    Science.gov (United States)

    2011-01-10

    North American Railways and the United States Department of Transportation : (US DOT) Federal Railroad Administration (FRA) require periodic inspection of railway : infrastructure to ensure the safety of railway operation. This inspection is a critic...

  7. Color image digitization and analysis for drum inspection

    International Nuclear Information System (INIS)

    Muller, R.C.; Armstrong, G.A.; Burks, B.L.; Kress, R.L.; Heckendorn, F.M.; Ward, C.R.

    1993-01-01

    A rust inspection system that uses color analysis to find rust spots on drums has been developed. The system is composed of high-resolution color video equipment that permits the inspection of rust spots on the order of 0.25 cm (0.1-in.) in diameter. Because of the modular nature of the system design, the use of open systems software (X11, etc.), the inspection system can be easily integrated into other environmental restoration and waste management programs. The inspection system represents an excellent platform for the integration of other color inspection and color image processing algorithms

  8. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1994-04-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organizations during the period form January 1994 through March 1994. A list of selected bulletins and information notices involving vendor issues and copies of pertinent correspondence involving vendor issues are also included in this periodical

  9. Computed Radiography: An Innovative Inspection Technique

    International Nuclear Information System (INIS)

    Klein, William A.; Councill, Donald L.

    2002-01-01

    Florida Power and Light Company's (FPL) Nuclear Division combined two diverse technologies to create an innovative inspection technique, Computed Radiography, that improves personnel safety and unit reliability while reducing inspection costs. This technique was pioneered in the medical field and applied in the Nuclear Division initially to detect piping degradation due to flow-accelerated corrosion. Component degradation can be detected by this additional technique. This approach permits FPL to reduce inspection costs, perform on line examinations (no generation curtailment), and to maintain or improve both personnel safety and unit reliability. Computed Radiography is a very versatile tool capable of other uses: - improving the external corrosion program by permitting inspections underneath insulation, and - diagnosing system and component problems such as valve positions, without the need to shutdown or disassemble the component. (authors)

  10. Inspection using high resolution holography of large volumes

    International Nuclear Information System (INIS)

    Tozer, B.A.; Webster, J.M.

    With a potential information storage density of 10 16 bits/m 2 , the ability to reconstruct in 3 dimensions, extremely wide angle of view, and potentially diffraction limited resolution, holography should be invaluable for the optical inspection and recording of normally inaccessible regions of nuclear power stations. This paper describes some possible applications and reviews a variety of practical problems which must be overcome if the potential is to be realised. Microscopic analysis of reconstructed real images of whole structures, recorded on a single photographic plate can be carried out at leisure to reveal cracks not visible to the naked eye on the original subject. Holograms of AGR fuel elements show a depth of field greater than the length of the element, with a resolution of about 10 μm at the nearest point and better than 300 μm on the rear grid being obtainable from one hologram. Factors limiting resolution, quality and reliability of holograms are discussed and some results presented which indicate the present boundaries of practical achievement in this promising field. (author)

  11. 9 CFR 381.71 - Condemnation on ante mortem inspection.

    Science.gov (United States)

    2010-01-01

    ... dressed, nor shall they be conveyed into any department of the official establishment where poultry... AGRICULTURE AGENCY ORGANIZATION AND TERMINOLOGY; MANDATORY MEAT AND POULTRY PRODUCTS INSPECTION AND VOLUNTARY INSPECTION AND CERTIFICATION POULTRY PRODUCTS INSPECTION REGULATIONS Ante Mortem Inspection § 381.71...

  12. Demonstrating the capability and reliability of NDT inspections

    International Nuclear Information System (INIS)

    Wooldridge, A.B.

    1996-01-01

    This paper discusses some recent developments in demonstrating the capability of ultrasonics, eddy currents and radiography both theoretically and in practice, and indicates where further evidence is desirable. Magnox Electric has been involved with development of theoretical models for all three of these inspection methods. Feedback from experience on plant is also important to avoid overlooking any practical limitations of the inspections, and to ensure that the metallurgical characteristics of potential defects have been properly taken into account when designing and qualifying the inspections. For critical applications, inspection techniques are often supported by a Technical Justification which draws on all the relevant theoretical and experimental evidence, as well as experience of inspections on plant. The role of technical justifications is discussed in the context of inspection qualification. (author)

  13. Pulse-echo ultrasonic inspection system for in-situ nondestructive inspection of Space Shuttle RCC heat shields.

    Energy Technology Data Exchange (ETDEWEB)

    Roach, Dennis Patrick; Walkington, Phillip D.; Rackow, Kirk A.

    2005-06-01

    The reinforced carbon-carbon (RCC) heat shield components on the Space Shuttle's wings must withstand harsh atmospheric reentry environments where the wing leading edge can reach temperatures of 3,000 F. Potential damage includes impact damage, micro cracks, oxidation in the silicon carbide-to-carbon-carbon layers, and interlaminar disbonds. Since accumulated damage in the thick, carbon-carbon and silicon-carbide layers of the heat shields can lead to catastrophic failure of the Shuttle's heat protection system, it was essential for NASA to institute an accurate health monitoring program. NASA's goal was to obtain turnkey inspection systems that could certify the integrity of the Shuttle heat shields prior to each mission. Because of the possibility of damaging the heat shields during removal, the NDI devices must be deployed without removing the leading edge panels from the wing. Recently, NASA selected a multi-method approach for inspecting the wing leading edge which includes eddy current, thermography, and ultrasonics. The complementary superposition of these three inspection techniques produces a rigorous Orbiter certification process that can reliably detect the array of flaws expected in the Shuttle's heat shields. Sandia Labs produced an in-situ ultrasonic inspection method while NASA Langley developed the eddy current and thermographic techniques. An extensive validation process, including blind inspections monitored by NASA officials, demonstrated the ability of these inspection systems to meet the accuracy, sensitivity, and reliability requirements. This report presents the ultrasonic NDI development process and the final hardware configuration. The work included the use of flight hardware and scrap heat shield panels to discover and overcome the obstacles associated with damage detection in the RCC material. Optimum combinations of custom ultrasonic probes and data analyses were merged with the inspection procedures needed to

  14. Nuclear fuel shipping inspection device

    International Nuclear Information System (INIS)

    Takahashi, Toshio; Hada, Koji.

    1988-01-01

    Purpose: To provide an nuclear fuel shipping inspection device having a high detection sensitivity and capable of obtaining highly reliable inspection results. Constitution: The present invention concerns a device for distinguishing a fuel assembly having failed fuel rods in LMFBR type reactors. Coolants in a fuel assembly to be inspected are collected by a sampling pipeway and transferred to a filter device. In the filter device, granular radioactive corrosion products (CP) in the coolants are captured, to reduce the background. The coolants, after being passed through the filter device, are transferred to an FP catching device and gamma-rays of iodine and cesium nuclides are measured in FP radiation measuring device. Subsequently, the coolants transferred to a degasing device to separate rare gas FP in the coolants from the liquid phase. In a case if rare gas fission products are detected by the radiation detector, it means that there is a failed fuel rod in the fuel assembly to be inspected. Since the CP and the soluble FP are separated and extracted for the radioactivity measurement, the reliability can be improved. (Kamimura, M.)

  15. Unannounced inspection for integrated safeguards: A theoretical perspective

    International Nuclear Information System (INIS)

    Canty, M.J.; Avenhaus, R.

    2001-01-01

    Full text: The application of a safeguards verification regime based on existing agreements under INFCIRC/153 and on the Additional Protocol, INFCIRC/540, has the potential to allow the International Atomic Energy Agency (IAEA) to relax its traditional facility and material-oriented inspection procedures. The relaxation will take into account the IAEA's enhanced access to information as well as complementary access to locations gained through the application of extended measures foreseen under the Additional Protocol. It will reflect the associated confidence achieved at the State level. It is generally agreed that such a trade-off between the new strengthening measures and the traditional measures is reasonable and desirable, both from the point of view of the inspected State, which would like to receive tangible credit for providing increased openness and transparency in its peaceful nuclear activities, and from the viewpoint of the IAEA, which must apportion its limited inspection resources efficiently. An often-discussed proposal to reduce routine inspection effort while maintaining safeguards effectiveness is to replace scheduled interim inspections with a smaller number of random, unannounced visits. Intuitively, the unpredictability aspect is appealing, as it places the potential diverter in a permanent state of uncertainty. There are also some disadvantages, however, such as the difficulty of planning and implementing truly random inspections and the burden experienced by facility operators obliged to accommodate them. An objective evaluation of a randomized inspection regime vis-a-vis conventional routine inspections requires an objective measure of effectiveness and a means of optimizing that measure - in other words a theoretical framework for analyzing verification problems. In our paper we provide such a framework by quantifying the notion of timely detection and by treating the problem consistently a strategic one. We present a series of models which

  16. Allegheny County Weights and Measures Inspections

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Inspections conducted by the Allegheny County Bureau of Weights and Measures. The Bureau inspects weighing and timing devices such as gas pumps, laundromat timers,...

  17. Risk-based inspection of nuclear power plants

    International Nuclear Information System (INIS)

    Masopust, R.

    1995-01-01

    A multidiscipline research programme was developed in the USA to establish risk-based inspections for NPP structures and equipment components. Based on this US research effort, the risk-based procedure for developing inspection guidelines for NPPs is described. The procedure includes the definition of systems, qualitative risk assessment, qualitative risk analysis and development of the inspection programme. The method, when adopted and modified, is recommended also for risk-based inspections of structures and equipment of WWER-type NPPs. A pilot application of the method to unit 1 of the Surry NPP is summarized. (Z.S.) 1 tab., 1 fig., 5 refs

  18. Inspection program for U.S. research reactors

    International Nuclear Information System (INIS)

    Isaac, Patrick J.

    2010-01-01

    This paper presents an established program for inspection of nuclear research reactors to ensure that systems and techniques are in accordance with regulatory requirements and to provide protection for the health and safety of the public. The inspection program, implemented from the time a facility gets licensed, remains in effect through operations, shutdown, decommissioning, and until the license is terminated. The program establishes inspection methodology for operating, safeguards, and decommissioning activities. Using a performance- based approach, inspectors focus their attention on activities important to safety. Inspection procedures allow the inspectors to assess facility safety and compliance to applicable requirements. A well designed inspection program is an integral part of the mechanism to ensure that the level of performance in the strategic areas of reactor safety, radiation safety, and safeguards is acceptable and provides adequate protection of public health and safety. (author)

  19. Inspection of Candu Nuclear Reactor Fuel Channels

    International Nuclear Information System (INIS)

    Baron, J.; Jarvis, G.N.; Dolbey, M.P.; Hayter, D.M.

    1986-01-01

    The Channel Inspection and Gauging Apparatus of Reactors (CIGAR) is a fully atomated, remotely operated inspection system designed to perform multi-channel, multi-task inspection of CANDU reactor fuel channels. Ultrasonic techniques are used for flaw detection, (with a sensitivity capable of detecting a 0.075 mm deep notch with a signal to noise ratio of 10 dB) and pressure tube wall thickness and diameter measurements. Eddy currrent systems are used to detect the presence of spacers between the coaxial pressure tube and calandria tube, as well as to measure their relative spacing. A servo-accelerometer is used to estimate the sag of the fuel channels. This advanced inspection system was commissioned and declared in service in September 1985. The paper describes the inspection systems themselves and discussed the results achieved to-date. (author) [pt

  20. Review of occupational radiation exposures in all biennial shutdown maintenance of Kaiga generating station

    International Nuclear Information System (INIS)

    Murukan, E.K.; Vinod Kumar, T.; Austine, N.X.; Soumia Menon, M.; Girish Kumar, K.; Rao, M.M.L.N.; Venkataramana, K.

    2008-01-01

    Full text: Kaiga generating station 1 and 2 consists of twin units of 220 M We pressurized heavy water reactors located in Karnataka, India. Major maintenance activities of one of the twin units are taken up once in two years (biennial shutdown) to execute system maintenance, system up gradation, surveillance and in-service inspection (ISI) jobs. BSDs are mandatory activities to comply with regulatory requirement to ensure the safety and reliability of plant system equipment. More than 65% of the station collective dose is contributed by biennial shutdown (BSD) jobs. It is observed that the man rem consumed during normal operation of the plant is less than 35% of the total man rem consumed. Since BSD jobs contributes significantly to station collective dose, an effective implementation of radiation protection programme specific to BSD is the key to control the occupational exposure. Various improvements in the field of radiation protection practices and process systems are adopted to achieve lowest collective dose at par with international standards. The key areas identified for application of various strategies to achieve ALARA were Man rem budgeting, Radiological condition monitoring, Radiation protection practices, Identification of critical jobs and Work groups, Work planning and execution, and Radioactive waste management. Review of collective doses of all the BSD jobs performed in the station since year 2004 and various measures incorporated to achieve ALARA exposures to plant personnel are briefly discussed in this paper. (author)

  1. Optical technologies for measurement and inspection

    International Nuclear Information System (INIS)

    Mader, D.L.

    1997-01-01

    Ontario Hydro has benefited from specialized optical measurement techniques such as FRILS (fret replica inspection laser system), which permits in-house inspections of pressure tube replicas and has been estimated to save $2M per year. This paper presents a brief overview of (1) FRILS, (2) OPIT (in-reactor Optical Profilometry Inspection Tool), (3) miniature optical probe for steam generator tubes, (4) laser vibrometer used for end-fitting vibration, and (5) computer vision to recognize the ends of fuel bundles and automatically measure their lengths. (author)

  2. Reliability of application of inspection procedures

    Energy Technology Data Exchange (ETDEWEB)

    Murgatroyd, R A

    1988-12-31

    This document deals with the reliability of application of inspection procedures. A method to ensure that the inspection of defects thanks to fracture mechanics is reliable is described. The Systematic Human Error Reduction and Prediction Analysis (SHERPA) methodology is applied to every task performed by the inspector to estimate the possibility of error. It appears that it is essential that inspection procedures should be sufficiently rigorous to avoid substantial errors, and that the selection procedures and the training period for inspectors should be optimised. (TEC). 3 refs.

  3. Reliability of application of inspection procedures

    International Nuclear Information System (INIS)

    Murgatroyd, R.A.

    1988-01-01

    This document deals with the reliability of application of inspection procedures. A method to ensure that the inspection of defects thanks to fracture mechanics is reliable is described. The Systematic Human Error Reduction and Prediction Analysis (SHERPA) methodology is applied to every task performed by the inspector to estimate the possibility of error. It appears that it is essential that inspection procedures should be sufficiently rigorous to avoid substantial errors, and that the selection procedures and the training period for inspectors should be optimised. (TEC)

  4. 46 CFR 2.10-101 - Annual vessel inspection fee.

    Science.gov (United States)

    2010-10-01

    ... inspections, damage surveys, repair and modification inspections, change in vessel service inspections, permit... of international certificates. (d) Entitlement to inspection services for the current year remains... MODUs 4,695 Semi-submersible MODUs 8,050 Nautical School Vessels: Length not greater than 100 feet 835...

  5. The role of independent inspection in verification activities

    International Nuclear Information System (INIS)

    Fuerste, W.

    1982-01-01

    Independent inspection has its origin in the early Middle Ages, when kings prescribed to textile manufacturers a quality control by authorized inspectors. Independent inspection became more important with respect to the safety of workers in the industrial era beginning in the 18th century, when the high-pressure steam engines were introduced and many accidents and explosions of steam boilers occurred. Nowadays, independent inspection is of utmost importance, because the safety of the public is endangered by industrial plants located near highly populated areas. To better understand the role of independent inspection, the paper reviews its historical development in Europe from the Middle Ages to the 20th century. Most of the independent inspection associations in European countries were established after the second half of the 19th century and began with the surveillance of steam boilers. Nowadays, organizations like the TUEVs (Technical Inspection Agencies) in the Federal Republic of Germany perform expertise and inspection on behalf of the government in various fields of industrial safety. To show how independent inspection is involved in quality assurance, the methods practised in the United States of America and the Federal Republic of Germany are compared and future trends discussed. For developing countries starting with nuclear energy, it is important to consider the information and recommendations regarding independent inspection and its regulation as laid down in a number of publications in the IAEA NUSS Programme. (author)

  6. Neural network based inspection of voids and karst conduits in hydro-electric power station tunnels using GPR

    Science.gov (United States)

    Kilic, Gokhan; Eren, Levent

    2018-04-01

    This paper reports on the fundamental role played by Ground Penetrating Radar (GPR), alongside advanced processing and presentation methods, during the tunnel boring project at a Dam and Hydro-Electric Power Station. It identifies from collected GPR data such issues as incomplete grouting and the presence of karst conduits and voids and provides full details of the procedures adopted. In particular, the application of collected GPR data to the Neural Network (NN) method is discussed.

  7. Mechanized ultrasonic inspection of austenitic pipe systems

    International Nuclear Information System (INIS)

    Dressler, K.; Luecking, J.; Medenbach, S.

    1999-01-01

    The contribution explains the system of standard testing methods elaborated by ABB ZAQ GmbH for inspection of austenitic plant components. The inspection tasks explained in greater detail are basic materials testing (straight pipes, bends, and pipe specials), and inspection of welds and dissimilar welds. The techniques discussed in detail are those for detection and sizing of defects. (orig./CB) [de

  8. 77 FR 12843 - Fees for Sanitation Inspections of Cruise Ships

    Science.gov (United States)

    2012-03-02

    ... Sanitation Inspections of Cruise Ships AGENCY: Centers for Disease Control and Prevention (CDC), Department... diseases. The fee schedule for sanitation inspections of passenger cruise ships inspected under VSP was... sanitation inspections. These inspections are conducted by CDC's Vessel Sanitation Program (VSP). VSP assists...

  9. Double-shell tank ultrasonic inspection plan. Revision 1

    International Nuclear Information System (INIS)

    Pfluger, D.C.

    1994-01-01

    The waste tank systems managed by the Tank Waste Remediation System Division of Westinghouse Hanford Company includes 28 large underground double-shell tanks (DST) used for storing hazardous radioactive waste. The ultrasonic (UT) inspection of these tanks is part of their required integrity assessment (WAC 1993) as described in the tank systems integrity assessment program plan (IAPP) (Pfluger 1994a) submitted to the Ecology Department of the State of Washington. Because these tanks hold radioactive waste and are located underground examinations and inspections must be done remotely from the tank annuli with specially designed equipment. This document describes the UT inspection system (DSTI system), the qualification of the equipment and procedures, field inspection readiness, DST inspections, and post-inspection activities. Although some of the equipment required development, the UT inspection technology itself is the commercially proven and available projection image scanning technique (P-scan). The final design verification of the DSTI system will be a performance test in the Hanford DST annulus mockup that includes the demonstration of detecting and sizing corrosion-induced flaws

  10. Inspection procedure and essential parameters in NDT qualification

    International Nuclear Information System (INIS)

    Sarkimo, M.

    2000-06-01

    The objective of the inspection qualification is to ensure that applied non-destructive methods (NDT) have the required performance. The approach of the qualification process is systematic and carefully documented and therefore some new requirements can be seen concerning the composition of the documentation. There are also new document types, that only application of the inspection qualification requires. The most important of these is the technical justification, that includes the documented evidences concerning the performance of the inspection system. This publication includes two reports: 'Compilation of the inspection procedure' and 'Essential/influential parameters in NDT qualification'. The former of these discusses the issues to be considered in an inspection procedure especially from the point of view of the mechanised ultrasonic testing. The later report explains the parameters formulated to analyse in the technical justification all aspects of the inspection application. (orig.)

  11. Waste Calcining Facility remote inspection report

    International Nuclear Information System (INIS)

    Patterson, M.W.; Ison, W.M.

    1994-08-01

    The purpose of the Waste Calcining Facility (WCF) remote inspections was to evaluate areas in the facility which are difficult to access due to high radiation fields. The areas inspected were the ventilation exhaust duct, waste hold cell, adsorber manifold cell, off-gas cell, calciner cell and calciner vessel. The WCF solidified acidic, high-level mixed waste generated during nuclear fuel reprocessing. Solidification was accomplished through high temperature oxidation and evaporation. Since its shutdown in 1981, the WCFs vessels, piping systems, pumps, off-gas blowers and process cells have remained contaminated. Access to the below-grade areas is limited due to contamination and high radiation fields. Each inspection technique was tested with a mock-up in a radiologically clean area before the equipment was taken to the WCF for the actual inspection. During the inspections, essential information was obtained regarding the cleanliness, structural integrity, in-leakage of ground water, indications of process leaks, indications of corrosion, radiation levels and the general condition of the cells and equipment. In general, the cells contain a great deal of dust and debris, as well as hand tools, piping and miscellaneous equipment. Although the building appears to be structurally sound, the paint is peeling to some degree in all of the cells. Cracking and spalling of the concrete walls is evident in every cell, although the east wall of the off-gas cell is the worst. The results of the completed inspections and lessons learned will be used to plan future activities for stabilization and deactivation of the facility. Remote clean-up of loose piping, hand tools, and miscellaneous debris can start immediately while information from the inspections is factored into the conceptual design for deactivating the facility

  12. MINAC, A new radiographic inspection capability

    International Nuclear Information System (INIS)

    Lapides, M.E.; Schonberg, R.

    1983-01-01

    In service, radiographic inspection of thick section, metallic components has historically been limited to the capabilities of radioisotopic sources such as cobalt and iridium. Although practical in many applications, these sources tend to be restricted by output intensity, by resolution obtainable, and by the physical size and weight of necessary transport shielding. In nuclear plant applications, any radiography is also frequently inhibited by the presence of a radiation background from activated corrosion products on the inspection object which may fog the film before the desired exposure is achieved. In recognition of these limitations and the need for improved capability in the conduct of mandated ten-year inspection of U.S. nuclear plant components such as reactor coolant pumps, pressure vessel nozzles and valve bodies, the Electric Power Research Institute (EPRI) undertook the development of a high energy, X-ray device appropriate for in service inspection of thick section (up to approximately 30 cm of steel) components. The development was conducted by Schonberg Radiation (U.S.A). The product, MINAC, a miniaturized linear accelerator system, has been in use in many plant inspections since April 1981. This paper describes the development and typical applications of MINAC

  13. 78 FR 51728 - Fees for Sanitation Inspections of Cruise Ships

    Science.gov (United States)

    2013-08-21

    ... Sanitation Inspections of Cruise Ships AGENCY: Centers for Disease Control and Prevention (CDC), Department... for vessel sanitation inspections for Fiscal Year (FY) 2014. These inspections are conducted by HHS...-yearly inspections and, when necessary, re-inspection. DATES: These fees are effective October 1, 2013...

  14. Inspection control and the environmental protection

    Directory of Open Access Journals (Sweden)

    Milkov Dragan L.

    2015-01-01

    Full Text Available Environmental protection is the task of many administrative bodies, but the activity of the environmental inspection is of special importance. According to the Law on Environmental Protection, inspection's tasks in this area belong to the competence of republican bodies, ie. Ministry of Agriculture and Environmental Protection. Autonomous province and local self-government have only delegated competence in this field, under condition that this is explicitly regulated in special laws. Environmental inspection's activity consists in preventive actions, certain prior - preparatory activities and the audit itself. In addition, following the intervention of the Inspector issue of the control may be corrective or repressive. According to the Law on Inspection Control and the Law on Environmental Protection, the inspectors have a number of powers and responsibilities, which enable them to ensure the lawful and proper conduct of individuals and legal entities.

  15. Plant abnormality inspection device

    International Nuclear Information System (INIS)

    Takenaka, Toshio.

    1990-01-01

    The present invention concerns a plant abnormality inspection device for conducting remote or automatic patrolling inspection in a plant and, more particularly, relates to such a device as capable of detecting abnormal odors. That is, the device comprises a moving device for moving to a predetermined position in the plant, a plurality of gas sensors for different kind of gases to be inspected mounted thereon, a comparator for comparing the concentration of a gas detected by the gas sensor with the normal gas concentration at the predetermined position and a judging means for judging the absence or presence of abnormality depending on the combination of the result of the comparison and deliverying a signal if the state is abnormal. As a result, a slight amount of gas responsible to odors released upon abnormality of the plant can be detected by a plurality of gas sensors for different kinds gases to rapidly and easily find abnormal portions in the plant. (I.S.)

  16. AECB staff annual assessment of the Bruce B Nuclear Generating Station for the year 1994

    International Nuclear Information System (INIS)

    1995-06-01

    AECB staff believes Ontario Hydro operated Bruce B safely in 1994. The Bruce B reactors will remain limited to 88% full power until Ontario Hydro is able to demonstrate that it is safe to operate at higher powers. Ontario Hydro's compliance with AECB regulations and the Operating Licence was satisfactory. AECB found no major violations. The station performance was similar to previous years. Radiation doses to workers and the public were well below the legal limits and also remained below Ontario Hydro's internal targets. Worker radiation doses increased slightly but were comparable to previous years. Inspection of pressure tubes and steam generator tubes by Ontario Hydro showed continuing tube degradation. However, we believe that Ontario Hydro made progress in correcting and managing these problems. Ontario Hydro carried out a full-scale fire drill at Bruce B in 1994. AECB witnessed the drill and were pleased to observe a significant improvement in the station's fire-fighting capability. 7 tabs., 4 figs

  17. Advances in technologies for feeder pipe inspections

    Energy Technology Data Exchange (ETDEWEB)

    Ten Grotenhuis, R.; Verma, Y.; Hitchcox, T.; Sakuta, A. [Ontario Power Generation, Inspection and Maintenance Div., Toronto, Ontario (Canada)

    2014-07-15

    The successful development of the Matrix Inspection Technique (MIT) for feeder weld area applications has been followed up with a project to leverage the technology to address other aspects of feeder inspection. The goal of the project is to adapt the technology to provide full circumferential inspection of feeder pipes for FAC thinning and, potentially, for axial cracking. The project necessitated evolving a new generation of high speed, high element count data acquisition instruments. It also required the development of custom inspection arrays, innovative approaches to sealing the water column, use of inertial motion sensors to synthesize encoder inputs, real-time visual feedback for the operator, and enhanced automated analysis software capable of plotting the inspected configuration in 3D. The individual components of the system are currently being integrated into a whole. The results obtained to date demonstrate the approach to be fundamentally sound. (author)

  18. Optimal allocation of International Atomic Energy Agency inspection resources

    International Nuclear Information System (INIS)

    Markin, J.T.

    1987-12-01

    The Safeguards Department of the International Atomic Energy Agency (IAEA) conducts inspections to assure the peaceful use of a state's nuclear materials and facilities. Because of limited resources for conducting inspections, the careful disposition of inspection effort among these facilities is essential if the IAEA is to attain its safeguards goals. This report describes an optimization procedure for assigning an inspection effort to maximize attainment of IAEA goals. The procedure does not require quantitative estimates of safeguards effectiveness, material value, or facility importance. Instead, the optimization is based on qualitative, relative prioritizations of inspection activities and materials to be safeguarded. This allocation framework is applicable to an arbitrary group of facilities such as a state's fuel cycle, the facilities inspected by an operations division, or all of the facilities inspected by the IAEA

  19. 10 CFR 19.15 - Consultation with workers during inspections.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Consultation with workers during inspections. 19.15...: INSPECTION AND INVESTIGATIONS § 19.15 Consultation with workers during inspections. (a) Commission inspectors... inspectors deem necessary for the conduct of an effective and thorough inspection. (b) During the course of...

  20. The United States Nuclear Regulatory Commission's vendor inspection program

    International Nuclear Information System (INIS)

    Grier, B.H.

    1977-01-01

    The NRC conducts a program of inspection at licensee contractors and vendors to assure that quality assurance programs meet applicable NRC requirements. This inspection program, which was begun in 1965 and restructured in 1974, is discussed. A trial program has recently been initiated to evaluate the use of the ASME N-stam inspection system to supplement NRC inspections. The criteria for NRC acceptance of such a third party inspection system are described in the paper. (author)

  1. An inspection demonstration program/a quality system

    International Nuclear Information System (INIS)

    Cox, L.D.

    1995-01-01

    Mobil relies on tubular manufacturers to consistently supply OCTG which complies with all material requirements of API Specification 5CT. This paper details the Mobil Inspection Demonstration Program; Mobil's method for qualifying ultrasonic inspection systems for use during Mobil receiving inspections. Additionally, the basic fundamentals of the Mobil quality system and acceptance sampling are presented with an emphasis on tracking short-term and long-term supplier performance

  2. Development of an optical inspection bench for the inspection of internal surfaces of 650 MHz SCRF cavities

    International Nuclear Information System (INIS)

    Kokil, S.V.; Kane, G.V.; Raghavendra, S.; Chauhan, S.K.; Rajpoot, D.S.; Oraon, B.; Om Prakash; Joshi, S.C.

    2015-01-01

    An optical inspection system has been developed for inspection of internal surfaces of 650 MHz superconducting RF cavities. The cavity parts are welded either using Electron Beam or Laser Beam Welding for making a good quality of weld joints. Surface defects like pits, scratches, welding spatters etc. on the internal surface of the cavity deteriorates cavity performance. Surface quality of the cavity equator joint plays an important role in the cavity performance. To study the quality of equator surface, the inspection bench offers high resolution images with a linear resolution of 45 m/pixel at a distance of ∼200 mm. The bench comprises of two major sub-systems, optical imaging system and cavity positioning system. A digital camera and multi coloured illumination system is used to obtain high resolution images. The camera is mounted inside a long cylindrical tube. The cylindrical tube can be inserted into a SCRF cavity. The length of the cylinder is long enough to inspect five-cell 650 MHz SCRF cavity. The cavity is placed on a set of PTFE rollers, which are mounted on a trolley. The cavity can be moved linearly with the help of ball screw-servomotor mechanism. The camera along with cylindrical tube can be rotated around its axis with a stepper motor to scan the cavity's internal surface. The paper presents the details about the optical inspection bench and optical inspection results. (author)

  3. 49 CFR 224.109 - Inspection, repair, and replacement.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Inspection, repair, and replacement. 224.109 Section 224.109 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD..., Inspection, and Maintenance of Retroreflective Material § 224.109 Inspection, repair, and replacement. (a...

  4. 48 CFR 52.246-1 - Contractor Inspection Requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor Inspection....246-1 Contractor Inspection Requirements. As prescribed in 46.301, insert the following clause: Contractor Inspection Requirements (APR 1984) The Contractor is responsible for performing or having...

  5. [PICS: pharmaceutical inspection cooperation scheme].

    Science.gov (United States)

    Morénas, J

    2009-01-01

    The pharmaceutical inspection cooperation scheme (PICS) is a structure containing 34 participating authorities located worldwide (October 2008). It has been created in 1995 on the basis of the pharmaceutical inspection convention (PIC) settled by the European free trade association (EFTA) in1970. This scheme has different goals as to be an international recognised body in the field of good manufacturing practices (GMP), for training inspectors (by the way of an annual seminar and experts circles related notably to active pharmaceutical ingredients [API], quality risk management, computerized systems, useful for the writing of inspection's aide-memoires). PICS is also leading to high standards for GMP inspectorates (through regular crossed audits) and being a room for exchanges on technical matters between inspectors but also between inspectors and pharmaceutical industry.

  6. 9 CFR 590.24 - Egg products plants requiring continuous inspection.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Egg products plants requiring..., DEPARTMENT OF AGRICULTURE EGG PRODUCTS INSPECTION INSPECTION OF EGGS AND EGG PRODUCTS (EGG PRODUCTS INSPECTION ACT) Scope of Inspection § 590.24 Egg products plants requiring continuous inspection. No plant in...

  7. 49 CFR Appendix A to Part 230 - Inspection Requirements

    Science.gov (United States)

    2010-10-01

    ... valve. 2. Testing of water glasses and gauge cocks.* 3. Inspection of tubular water glass shields. 4... for indication of leaks. 7. Inspection for leaks obstructing vision of engine crew. 8. Observance of... Service Day Inspection Requirements; § 230.14 1. Washing of boiler. 2. Cleaning and inspection of water...

  8. 9 CFR 381.38 - Overtime and holiday inspection service.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Overtime and holiday inspection... Inspection; Overtime and Holiday Service; Billing Establishments § 381.38 Overtime and holiday inspection... Program, at the rate specified in § 391.3, for the cost of the inspection service furnished on any holiday...

  9. Federal environmental inspections handbook

    International Nuclear Information System (INIS)

    1991-10-01

    This Federal Environmental Inspection Handbook has been prepared by the Department of Energy (DOE), Office of Environmental Guidance, RCRA/CERCLA Division (EH-231). It is designed to provide DOE personnel with an easily accessible compilation of the environmental inspection requirements under Federal environmental statutes which may impact DOE operations and activities. DOE personnel are reminded that this Handbook is intended to be used in concert with, and not as a substitute for, the Code of Federal Regulations (CFR). Federal Register (FR), and other applicable regulatory documents

  10. Actinic inspection of multilayer defects on EUV masks

    International Nuclear Information System (INIS)

    Barty, A; Liu, Y; Gullikson, E; Taylor, J S; Wood, O

    2005-01-01

    The production of defect-free mask blanks, and the development of techniques for inspecting and qualifying EUV mask blanks, remains a key challenge for EUV lithography. In order to ensure a reliable supply of defect-free mask blanks, it is necessary to develop techniques to reliably and accurately detect defects on un-patterned mask blanks. These inspection tools must be able to accurately detect all critical defects whilst simultaneously having the minimum possible false-positive detection rate. There continues to be improvement in high-speed non-actinic mask blank inspection tools, and it is anticipated that these tools can and will be used by industry to qualify EUV mask blanks. However, the outstanding question remains one of validating that non-actinic inspection techniques are capable of detecting all printable EUV defects. To qualify the performance of non-actinic inspection tools, a unique dual-mode EUV mask inspection system has been installed at the Advanced Light Source (ALS) synchrotron at Lawrence Berkeley National Laboratory. In high-speed inspection mode, whole mask blanks are scanned for defects using 13.5-nm wavelength light to identify and map all locations on the mask that scatter a significant amount of EUV light. In imaging, or defect review mode, a zone plate is placed in the reflected beam path to image a region of interest onto a CCD detector with an effective resolution on the mask of 100-nm or better. Combining the capabilities of the two inspection tools into one system provides the unique capability to determine the coordinates of native defects that can be used to compare actinic defect inspection with visible light defect inspection tools under commercial development, and to provide data for comparing scattering models for EUV mask defects

  11. Design and implementation for integrated UAV multi-spectral inspection system

    Science.gov (United States)

    Zhu, X.; Li, X.; Yan, F.

    2018-04-01

    In order to improve the working efficiency of the transmission line inspection and reduce the labour intensity of the inspectors, this paper presents an Unmanned Aerial Vehicle (UAV) inspection system architecture for the transmission line inspection. In this document, the light-duty design for different inspection equipment and processing terminals is completed. It presents the reference design for the information-processing terminal, supporting the inspection and interactive equipment accessing, and obtains all performance indicators of the inspection information processing through the tests. Practical application shows that the UAV inspection system supports access and management of different types of mainstream fault detection equipment, and can implement the independent diagnosis of the detected information to generate inspection reports in line with industry norms, which can meet the fast, timely, and efficient requirements for the power line inspection work.

  12. 46 CFR 167.15-20 - Inspections of nautical school ships.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Inspections of nautical school ships. 167.15-20 Section... NAUTICAL SCHOOL SHIPS Inspections § 167.15-20 Inspections of nautical school ships. (a) At each annual inspection, or oftener if deemed necessary, the inspector will inspect the hull, boilers, machinery...

  13. 46 CFR 109.205 - Inspection of boilers and machinery.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Inspection of boilers and machinery. 109.205 Section 109... OPERATIONS Tests, Drills, and Inspections § 109.205 Inspection of boilers and machinery. The chief engineer or engineer in charge, before he assumes charge of the boilers and machinery of a unit shall inspect...

  14. 47 CFR 80.903 - Inspection of radiotelephone installation.

    Science.gov (United States)

    2010-10-01

    ... ship passes the inspection, the technician will issue a Communications Act Safety Radiotelephony... 47 Telecommunication 5 2010-10-01 2010-10-01 false Inspection of radiotelephone installation. 80... Passenger Boats § 80.903 Inspection of radiotelephone installation. Every vessel subject to Part III of...

  15. Generic Reliability-Based Inspection Planning for Fatigue Sensitive Details

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard; Straub, Daniel; Faber, Michael Havbro

    2005-01-01

    of fatigue sensitive details in fixed offshore steel jacket platforms and FPSO ship structures. Inspection and maintenance activities are planned such that code based requirements to the safety of personnel and environment for the considered structure are fulfilled and at the same time such that the overall......The generic approach for planning of in-service NDT inspections is extended to cover the case where the fatigue load is modified during the design lifetime of the structure. Generic reliability-based inspection planning has been developed as a practical approach to perform inspection planning...... expected costs for design, inspections, repairs and failures are minimized. The method is based on the assumption of “no-finds” of cracks during inspections. Each fatigue sensitive detail is categorized according to their type of details (SN curves), FDF values, RSR values, inspection, repair and failure...

  16. An intelligent inspection and survey robot

    International Nuclear Information System (INIS)

    Byrd, J.; Holland, J.M.

    1994-01-01

    ARIES (Autonomous Robotic Inspection Experimental System) is a semi-autonomous robotic system intended for use in the automatic inspection of stored containers of low-level nuclear waste. This article describes the technology and how it could be used. 3 refs., 3 figs

  17. Consideration regarding the scheduling of unannounced or randomized inspections

    International Nuclear Information System (INIS)

    Sanborn, J.

    2001-01-01

    Full text: Randomized inspection strategies, including unannounced, short notice, or randomly selected scheduled inspections can play an useful role in integrated safeguards by allowing a reduction in the number of inspections without sacrificing coverage of diversion scenarios. The Agency and member states have proposed such strategies as important elements of integrated safeguards proposals at reactors as well as bulk handling facilities. The Agency, however, has limited experience with such inspections, and a number of issues need to be addressed before effective implementation can occur; how these issues are resolved will determine how effective the inspections will be. This paper focuses on the question of how to determine the timing of such inspections. It is pointed out that there are a large number of variants of the idea of 'randomized inspection,' and that each option will have advantages and disadvantages from the points of view of the operator, the logistics of inspection scheduling, and the capabilities for detection. The method chosen should depend on the type of scenarios that the Agency wishes to detect. The mathematically purest form of randomized schedule will have broad theoretical applicability, but may prove more difficult to put into practice, and may be unnecessary, or even sub-optimal, depending on the inspection objective. On the other hand, each restriction on inspection that provides the operator with information on when the inspection will occur must be taken into account when assessing detection probability. The paper reviews a number of scheduling approaches in the context of different objectives and considers effectiveness, operational impact, and practicality. (author)

  18. Review of progress in magnetic particle inspection

    Science.gov (United States)

    Eisenmann, David J.; Enyart, Darrel; Lo, Chester; Brasche, Lisa

    2014-02-01

    Magnetic particle inspection (MPI) has been widely utilized for decades, and sees considerable use in the aerospace industry with a majority of the steel parts being inspected with MPI at some point in the lifecycle. Typical aircraft locations inspected are landing gear, engine components, attachment hardware, and doors. In spite of its numerous applications the method remains poorly understood, and there are many aspects of that method which would benefit from in-depth study. This shortcoming is due to the fact that MPI combines the complicated nature of electromagnetics, metallurgical material effects, fluid-particle motion dynamics, and physiological human factors into a single inspection. To promote understanding of the intricate method issues that affect sensitivity, or to assist with the revision of industry specifications and standards, research studies will be prioritized through the guidance of a panel of industry experts, using an approach which has worked successfully in the past to guide fluorescent penetrant inspection (FPI) research efforts.

  19. Mobile X-ray inspection of light weight materials

    International Nuclear Information System (INIS)

    Ewert, Uwe; Redmer, Bernhard; Raedel, Christoph; Osterloh, Kurt; Schnars, Ulf; Henrich, Rudolf; Schimmelmann, Olaf; Bavendiek, Klaus; Jahn, Mirko

    2008-01-01

    Digital detectors such as phosphor imaging plates (IP) and digital detector arrays (DDA) allow radiographic inspection with higher efficiency and improved image quality in comparison to the classic film technique. Mobile X-ray flash tubes are used routinely for veterinarian and security applications. New high sensitive IPs and DDAs enable to apply them for inspection of light materials with low X-ray attenuation as in aluminium, plastics and composites. A versatile computed tomography (CT) system was developed for in situ inspection of large aircraft components under production conditions. A gate based planar computed tomograph was developed and tested for inspection of integrity of the stringer incorporation. Successful test trials were performed to prove the detection rate of cracks in embedded stringers. Honey comb structures of aircrafts have to be inspected for water inclusions during in-service inspections. Thermography is a powerful method for in house inspections when variations in temperature caused e.g. by sunshine can be excluded. A new X-ray diaphragm was developed for mobile back scatter measurements of large components. This method is insensitive to heat alterations in the field and thus can be applied also outdoors. (orig.)

  20. Targeted In-service Inspections Using Risk Insights

    International Nuclear Information System (INIS)

    Kulat, S.; Montgomery, B.; Robin Graybeal, M.

    2012-01-01

    This paper includes a discussion of the historical background and rationale for development of a targeted In-service Inspection (ISI) program using risk insights, known as Risk-Informed In-service Inspection (RI-ISI). RI-ISI programs are optimized inspection programs which target specific welds for inspection based upon potential degradation mechanisms and consequences of failure. Inspections are performed on those welds that are the highest contributors to plant risk. Additionally the inspections are tailored to detect the specific postulated degradation mechanisms. As a result, the numbers of inspections are reduced along with the associated cost and radiation exposure, while maintaining or improving the level of quality and safety. Provided in this paper are the basic principles of RI-ISI program development, and a summary of the impact of the implementation of such programs. For example, implementation of a Risk-Informed In-service Inspection program results in a reduction of both cost and radiation exposure. Cost savings are estimated at between USD 1,000,000 and USD 2,300,000 per unit per ten year interval for a Class 1 and2 RI-ISI application. Cost savings are estimated based on average cost per weld of USD 7600 for examination, including the following activities: erection and removal of scaffolding, removal and replacement of insulation, removal and replacement of interferences, weld preparation, examination, documentation, craft support. Reduction in radiation exposure is estimated at 75% to 90% for a Class 1 and2 RI-ISI application. Reduction in radiation exposure is due to the following factors: number of welds selected for examination decreases by 60% to 75%, surface examinations essentially eliminated, within a given risk category, welds can be selected for examination based on additional factors such as the minimization of radiation exposure.(author).