WorldWideScience

Sample records for inspection stations

  1. Periodical inspection in nuclear power stations

    International Nuclear Information System (INIS)

    1986-01-01

    Periodical inspection is presently being made of eight nuclear power plants in nuclear power stations. Up to the present time, in three of them, failures as follows have been observed. (1) Unit 3 (PWR) of the Mihama Power Station in The Kansai Electric Power Co., Inc. Nineteen heat-transfer tubes of the steam generators were plugged up due to failure. A fuel assembly with a failed spring fixture and in another the control-rod cluster with a failed control rod fixture were replaced. (2) Unit 2 (PWR) of the Oi Power Station in The Kansai Electric Power Co., Inc. Eight heat-transfer tubes of the heat exchangers were plugged up due to failure. (3) Unit 6 (BWR) of the Fukushima Nuclear Power Station I in The Tokyo Electric Power Co., Inc. A fuel assembly with leakage was replaced. (Mori, K.)

  2. 47 CFR 80.1067 - Inspection of station.

    Science.gov (United States)

    2010-10-01

    ... Inspection of station. (a) Ships must have the required equipment inspected at least once every 12 months by an FCC-licensed technician holding a GMDSS Radio Maintainer's License. If the ship passes the... 47 Telecommunication 5 2010-10-01 2010-10-01 false Inspection of station. 80.1067 Section 80.1067...

  3. Boiler inspection manipulator for Torness Power Station

    International Nuclear Information System (INIS)

    Carrey, R.T.A.; Yule, I.Y.; Sibson, S.; Playle, M.J.

    1996-01-01

    The Advanced Gas-cooled Reactors at Torness and Heysham 2 are provided with dedicated access for remote inspection equipment. These in-service inspection (ISI) accesses comprise 12 penetrations above the core for inspection of the above core area and boilers, 12 below core penetrations for inspection of the lower boiler area and access through any of the 8 gas circulator penetrations for inspection of the sub-diagrid area. This paper describes a manipulator which will access the reactor from above the core via any of the 8 peripheral penetrations. (UK)

  4. Boiler inspection manipulator for Torness Power Station

    International Nuclear Information System (INIS)

    Carrey, R.T.A.; Playle, M.J.

    1996-01-01

    In-service inspection at Torness Advanced Gas-cooled Reactor is achieved, via penetrations above and below the core area and boilers and through eight circulator penetrations for inspection of the sub-diagrid area. A manipulator is described which can access the area above the reactor core via any of these eight peripheral penetrations. The design and fabrication of the manipulator has led to innovation with a number of possible solutions being tendered. In reactor deployment of the successful design is expected in early 1997. (UK)

  5. Recent advances in automated ultrasonic inspection of Magnox power stations

    International Nuclear Information System (INIS)

    Wooldridge, A.B.

    2006-01-01

    Magnox Electric operates a number of Magnox nuclear power stations, some of which have presented difficult inspection challenges. This paper will describe recent advances in automated ultrasonic techniques which have enabled additional, fully effective and qualified inspections to be introduced. The examples chosen involve phased array inspection of fillet welds and the introduction of 3D data display and analysis using NDT Workbench. Ultrasonic phased arrays have been optimised for inspection of fillet welded structures where physical access for the operator is very awkward and the surfaces available for probe scanning are very restricted. In addition to controlling the beam direction and focus depth, the systems have also optimised the depth of field by varying the number of phased array elements fired at a given time. These phased array inspections are substantially superior in quality, reliability and speed compared with that achievable by conventional manual inspection. Analysis of automated ultrasonic data can be very time-consuming if defects are complex. NDT Workbench significantly improves data analysis for complex geometries and defects primarily because of the 3D data displays of multiple beams and automated logging of measurements. This system has been used in 2005 for data analysis of complex defects where sizing accuracy was particularly important. Both these inspection procedures have been formally qualified using the ENIQ (European Network for Inspection Qualification) Methodology. Such qualification was achieved more easily because of the rigorous in house training programmes established in each case and because the Technical Justifications referred to evidence from previous related qualifications whenever appropriate. The timely achievement of inspection qualification demonstrates that the new systems have reached sufficient maturity to be used with confidence for high quality inspections. (orig.)

  6. Automated ultrasonic inspection system for nuclear power stations

    International Nuclear Information System (INIS)

    Anon.

    1976-01-01

    The automated system of ultrasonic inspection which was used to conduct weld inspections of the complex primary system of the Borselle PWR station is described. It relies upon mechanically traversing purpose designed multi-crystal ultrasonic probes along the welds. A number of probes are switched sequentially to provide a continuous scan. A typical scan rate of 120 scan/sec is achieved by a multiplexer capable of switching transmitter and receiver individually. The system has wide applications in other industries. (U.K.)

  7. 47 CFR 80.79 - Inspection of ship station by a foreign Government.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Inspection of ship station by a foreign... Requirements-Ship Stations § 80.79 Inspection of ship station by a foreign Government. The Governments or appropriate administrations of countries which a ship visits may require the license of the ship station or...

  8. Improvement and optimization for in-service inspection of M310 nuclear power station

    International Nuclear Information System (INIS)

    Wang Chen; Sun Haitao; Gao Chen; Deng Dong

    2015-01-01

    In-service inspection (ISI) is an important method to ensure the safety of the mechanical equipment in nuclear power stations. According to the in-service inspection experience feedback from the domestic nuclear power stations, the reasonableness of some provisions in the RSE-M code are discussed and the applications of risk-informed in-service inspection (RI-ISI) are introduced, and the advices for the optimization of the ISI of the domestic M310 nuclear power stations are proposed. (authors)

  9. 47 CFR 73.3527 - Local public inspection file of noncommercial educational stations.

    Science.gov (United States)

    2010-10-01

    ... main studio and public file outside its community of license shall: (i) Make available to persons... 47 Telecommunication 4 2010-10-01 2010-10-01 false Local public inspection file of noncommercial... public inspection file of noncommercial educational stations. (a) Responsibility to maintain a file. The...

  10. Safety procedures in operation of inspection and maintenance of pressure reduction and metering stations

    International Nuclear Information System (INIS)

    Villas Boas, Ademar Jose; Biesemeyer, Marco Aurelio R.

    2000-01-01

    Each local Natural Gas Distribution Company in Brazil has its own working procedures for operations of inspection and maintenance on equipment and accessories connected to the gas network. Some of these Companies developed a better elaborated and documented way of working routines, while others only work based on their operators experience. The objective of this work is to create a standard procedure for operations of inspection and maintenance of Pressure Reducing Stations and Metering Stations, mainly the ones concerned to safety aspects. This work has no intention of exhausting all aspects related to this subject but to become the first step to standardize these types of operations among Natural Gas Distribution Companies. (author)

  11. Design and implementation of check out station for large container inspection system

    International Nuclear Information System (INIS)

    Yao Dongsheng; Gao Wenhuan; Kang Kejun

    1997-01-01

    In Large Container Inspection System (LCIS), Check Out Station (COS) is in charge of deciding whether a container is allowed to pass or has to be opened for checking. Several different top level architecture designs for COS are discussed and analyzed according to the practical requirements of COS

  12. Results of the 5th regular inspection of Unit 1 in the Hamaoka Nuclear Power Station

    International Nuclear Information System (INIS)

    1983-01-01

    The 5th regular inspection of Unit 1 in the Hamaoka Nuclear Power Station was carried out from March 27 to July 27, 1982. Inspection was made on the reactor proper, reactor cooling system, instrumentation/control system, radiation control facility, etc. By the examinations of external appearance, leakage, performance, etc., no abnormality was observed. In the regular inspection, personnel exposure dose was all below the permissible level. The works done during the inspection were the following: the replacement of control rod drives, the replacement of core support-plate plugs, the repair of steam piping, steam extraction pipes and feed water heaters, the repair of a waste-liquid concentrator, the installation of barriers and leak detectors, the installation of drain sump monitors in a containment vessel, the replacement of concentrated liquid waste pumps, the employment of type B fuel. (Mori, K.)

  13. Task analysis and structure scheme for center manager station in large container inspection system

    International Nuclear Information System (INIS)

    Li Zheng; Gao Wenhuan; Wang Jingjin; Kang Kejun; Chen Zhiqiang

    1997-01-01

    LCIS works as follows: the accelerator generates beam pulses which are formed into fan shape; the scanning system drags a lorry with a container passing through the beam in constant speed; the detector array detects the beam penetrating the lorry; the projection data acquisition system reads the projections and completes an inspection image of the lorry. All these works are controlled and synchronized by the center manage station. The author will describe the process of the projection data acquisition in scanning mode and the methods of real-time projection data processing. the task analysis and the structure scheme of center manager station is presented

  14. Risk-based Inspection Guide for the Susquehanna Station HPCI system

    International Nuclear Information System (INIS)

    Travis, R.; Higgins, J.; Gunther, W.; Shier, W.

    1992-11-01

    The High Pressure Coolant Injection (HPCI) system has been examined from a risk perspective. A system Risk-based Inspection Guide (S-RIG) has been developed as an aid to HPCI system inspections at the Susquehanna Steam Electric Station (SSES) which is operated by Pennsylvania Power ampersand Light (PP ampersand L). Included in this S-RIG is a discussion of the role of HPCI in mitigating accidents and a presentation of PRA-based failure modes which could prevent proper operation of the system. The S-RIG uses industry operating experience, including plant-specific illustrative examples, to augment the basic PRA failure modes. It is designed to be used as a reference for both routine inspections and the evaluation of the significance of component failures

  15. Results of the 4th regular inspection in Unit 1 of the Mihama Nuclear Power Station

    International Nuclear Information System (INIS)

    1981-01-01

    The 4th regular inspection of Unit 1 in the Mihama Nuclear Power Station was made from July, 1975, to December, 1980, on its reactor and associated facilities. The respective stages of inspection during the years are described. The inspection by external appearance examination, disassembling leakage inspection and performance tests indicated crackings in piping for fuel-replacement water tank, the container penetration of recirculation pipe for residual-heat removal, and main steam-relief valve, and leakage in one fuel assembly. Radiation exposure of the personnel during the inspection was less than the permissible dose. Radiation exposure data for the personnel are given in tables. The improvements and repairs done accordingly were as follows: reapir of the piping for a fuel-replacement tank and recirculation piping for residual-heat removal, replacement of the main steam-relief valve, plugging of heating tubes for the steam-generator, replacement of pins and covers for control-rod guide pipes, improvement of safety protection system and installation of rare gas monitor. (J.P.N.)

  16. Eddy current automatic inspection of heat exchangers in nuclear power stations

    International Nuclear Information System (INIS)

    Cazal, M.; Scopelliti, J.D.; Mendez, J.

    1997-01-01

    This presentation describes the eddy current tube inspection techniques for heavy heat exchangers in nuclear power stations. The purpose of these eddy current tests, is first to determine the integrity of the heat exchanger tubes, and to characterize the related types of defects in each case following to their analysis and cause determination and subsequent inspection planning. This task requires a group highly qualified personnel with high tech automate equipment. The organization of the group required a correct function and task assignment in order to achieve efficiency in scheduling, with simultaneous inspection to different components in a continuous base and uninterruptedly. A lead specialist is in charge of the group, which is set up by several shift supervisors, a qualified tele manipulator installation crew a number of qualified tele manipulator operators, and the specialist for data acquisition and certified eddy current signal evaluators plus some other support technicians and administrations helpers. In order to comply with inspection requirements, a bunch of technical procedures had to be developed. The following equipment is available nowadays: Zetec SM-13, SM-23 and SM-22 tele manipulators for inspection probes positioning, with different shapes and configuration (rotating probes, flexible probes for U-Bends, and magnetic saturation probes endowed with their own driving units) and remote data acquisition units identified as MIZ-18 A and MIZ-30, which are remotely operated from a mobile lab installed in a trailer, outside the reactor building. The available equipment allows a simultaneous inspection of three different plant components (two steam generators and a moderator heat exchanger). We are also in a position of performing eddy current tube inspection in more than a NSP at the same time. The Zetec Eddynet software is used in the manipulator operation and for the data acquisition and defect evaluation. This software operates within Windows

  17. High Pressure Coolant Injection (HPCI) system risk-based inspection guide: Pilgrim Nuclear Power Station

    International Nuclear Information System (INIS)

    Shier, W.; Gunther, W.

    1992-10-01

    A review of the operating experience for the High Pressure Coolant Injection (HPCI) system at the Pilgrim Nuclear Power Station is described in this report. The information for this review was obtained from Pilgrim Licensee Event Reports (LERs) that were generated between 1980 and 1989. These LERs have been categorized into 23 failure modes that have been prioritized based on probabilistic risk assessment considerations. In addition, the results of the Pilgrim operating experience review have been compared with the results of of a similar, industry wide operating experience review. this comparison provides an indication of areas in the Pilgrim HPCI system that should be given increased attention in the prioritization of inspection resources

  18. High Pressure Coolant Injection system risk-based inspection guide for Hatch Nuclear Power Station

    International Nuclear Information System (INIS)

    DiBiasio, A.M.

    1993-05-01

    A review of the operating experience for the High Pressure Coolant Injection (HPCI) system at the Hatch Nuclear Power Station, Units 1 and 2, is described in this report. The information for this review was obtained from Hatch Licensee Event Reports (LERs) that were generated between 1980 and 1992. These LERs have been categorized into 23 failure modes that have been prioritized based on probabilistic risk assessment considerations. In addition, the results of the Hatch operating experience review have been compared with the results of a similar, industry wide operating, experience review. This comparison provides an indication of areas in the Hatch HPCI system that should be given increased attention in the prioritization of inspection resources

  19. Measurement station for interim inspections of Lightbridge metallic fuel rods at the Halden Boiling Water Reactor

    Science.gov (United States)

    Hartmann, C.; Totemeier, A.; Holcombe, S.; Liverud, J.; Limi, M.; Hansen, J. E.; Navestad, E. AB(; )

    2018-01-01

    Lightbridge Corporation has developed a new Uranium-Zirconium based metallic fuel. The fuel rods aremanufactured via a co-extrusion process, and are characterized by their multi-lobed (cruciform-shaped) cross section. The fuel rods are also helically-twisted in the axial direction. Two experimental fuel assemblies, each containing four Lightbridge fuel rods, are scheduled to be irradiated in the Halden Boiling Water Reactor (HBWR) starting in 2018. In addition to on-line monitoring of fuel rod elongation and critical assembly conditions (e.g. power, flow rates, coolant temperatures, etc.) during the irradiation, several key parameters of the fuel will be measured out-of-core during interim inspections. An inspection measurement station for use in the irradiated fuel handling compartment at the HBWR has therefore been developed for this purpose. The multi-lobed cladding cross section combined with the spiral shape of the Lightbridge metallic fuel rods requires a high-precision guiding system to ensure good position repeatability combined with low-friction guiding. The measurement station is equipped with a combination of instruments and equipment supplied from third-party vendors and instruments and equipment developed at Institute for Energy Technology (IFE). Two sets of floating linear voltage differential transformer (LVDT) pairs are used to measure swelling and diameter changes between the lobes and the valleys over the length of the fuel rods. Eddy current probes are used to measure the thickness of oxide layers in the valleys and on the lobe tips and also to detect possible surface cracks/pores. The measurement station also accommodates gamma scans. Additionally, an eddy-current probe has been developed at IFE specifically to detect potential gaps or discontinuities in the bonding layer between the metallic fuel and the Zirconium alloy cladding. Potential gaps in the bonding layer will be hidden behind a 0.5-1.0 mm thick cladding wall. It has therefore been

  20. Results of the 6th regular inspection of No. 1 plant in Mihama Power Station, Kansai Electric Power Co., Inc

    International Nuclear Information System (INIS)

    Anon.

    1985-01-01

    The 6th periodical inspection on Unit 1 in the Mihama Power Station was made for the period of July to December 1984. Inspection was made in the following: reactor proper, reactor cooling system, instrumentation and control system, radiation control facility, etc. By external appearance observation, disassembly, performance test, etc. there were observed no abnormalities. Personnel radiation exposure doses during the inspection were below the permissible level. The following modification etc. works were done in the periodical inspection: replacement of the accumulator safety valve, replacement of the out-reactor nuclear instrumentation panel, installation of accident-time monitors, replacement of the control-rod cluster guide tube support pins, alteration in the fuel enrichment. (Mori, K.)

  1. Results of 7th regular inspection of No.1 plant in Oi Power Station, Kansai Electric Power Co., Inc

    International Nuclear Information System (INIS)

    1989-01-01

    The 7th regular inspection of No.1 plant in Oi Power Station was carried out from December 25, 1987 to July 15, 1988. The parallel operation was resumed on June 23, 1988, 182 days after the start of the inspection. The facilities to be inspected were the reactor proper, reactor cooling system, measurement and control system, fuel facilities, radiation control facilities, waste facilities, reactor containment installation and emergency power generation system. On these facilities to be inspected, the appearance, disassembling, leak, function, performance and other inspections were carried out, and as the results, a part of the fitting of a water chamber partition cover for a steam generator broke off, significant signals were observed in 936 heating tubes of steam generators, 72 bolts for fixing the blade of a primary coolant pump were damaged, and leak was found in two fuel assemblies. The works related to this regular inspection were accomplished within the range of allowable radiation dose based on the relevant laws. The main reconstruction works carried out during the period of this regular inspection were the use of the fuel containing gadolinia, the removal of a thermometer bypass piping and the repair of defective steam generator tubes. (K.I.)

  2. The operator's requirement for in service inspection at Hinkley Point 'B' power station

    International Nuclear Information System (INIS)

    Outram, J.F.

    The subject is discussed under the following heads: the need for reactor internal inspection (safety; commercial interest); the methods available (man access inspection; remote viewing inspection); experience with man access; experience with remote viewing; reactor outage time -comparison of the two methods; contamination control; conclusions. (U.K.)

  3. Result of 11th regular inspection of No.1 plant in Shimane Nuclear Power Station, Chugoku Electric Power Co., Inc

    International Nuclear Information System (INIS)

    Anon.

    1987-01-01

    The 11th regular inspection of No.1 plant in Shimane Nuclear Power Station was carried out from January 9 to July 2, 1986. The parallel operation was resumed on June 19, 1986, 162 days after the parallel off. The facilities as the object of inspection were the reactor proper, reactor cooling system, measurement and control system, fuel facilities, radiation control facilities, waste facilities, reactor containment installation, and emergency power generation system. On these facilities as the object of inspection, the appearance, disassembling, leak, function, performance and other inspections were carried out, as the result, any abnormality was not found. The works related to this regular inspection were accomplished within the range of the allowable radiation dose based on the relevant laws. The main reconstruction works carried out during the period of this regular inspection were as follows. Feed water spargers were replaced with those of welded type, the material of the drain pipe for No.3 feed heater was changed to STPA 23, an exhaust compressor, an exhaust gas-water separator and others, which have not been used, were removed, and the connecting pipe for a liquid nitrogen evaporator was installed. (Kako, I.)

  4. Results of 8th regular inspection of No.2 plant in Hamaoka Nuclear Power Station, Chubu Electric Power Co., Inc

    International Nuclear Information System (INIS)

    1989-01-01

    The 8th regular inspection of No.2 plant in Hamaoka Nuclear Power Station was carried out from January 23 to June 28, 1988. The parallel operation was resumed on June 13, 1988, 143 days after the parallel off. The facilities to be inspected were the reactor proper, reactor cooling system, measurement and control system, fuel facilities, radiation control facilities, waste facilities, reactor containment installation and emergency power generation system. On these facilities to be inspected, the appearance, disassembling, leak, function, performance and other inspections were carried out, and as the result, abnormality was not found. However, during the preparation for running-in after starting up the reactor, the leak from a steam drain piping was found, therefore it was repaired. The works related to this regular inspection were accomplished within the range of allowable radiation dose based on the relevant laws. The maim reconstruction works carried out during the period of this regular inspection were the replacement of the components of cooling seawater pumps, the repair of a steam drain piping in the high pressure injection system and the replacement of LP turbine rotors. (K.I.)

  5. Development of in-service inspection plans for nuclear components at the Surry 1 nuclear power station

    International Nuclear Information System (INIS)

    Vo, T.V.; Simonen, F.A.; Doctor, S.R.; Smith, B.W.; Gore, B.F.

    1993-01-01

    As part of the nondestructive evaluation reliability program sponsored by the US Nuclear Regulatory Commission at Pacific Northwest Laboratory, a methodology has been developed for establishing in-service inspection priorities of nuclear power plant components. The method uses results of probabilistic risk assessment in conjunction with the techniques of failure modes and effects analysis to identify and prioritize the most risk-important systems and components for inspection at nuclear power plants. Surry nuclear power station unit 1 was selected for demonstrating the methodology. The specific systems selected for analysis were the reactor pressure vessel, the reactor coolant, the low pressure injection including the accumulators, and the auxiliary feedwater. The results provide a risk-based ranking of components that can be used to establish a prioritization of the components and a basis for developing improved in-service inspection plans at nuclear power plants

  6. 78 FR 24666 - Updates to the List of Plant Inspection Stations

    Science.gov (United States)

    2013-04-26

    ... 319 Coffee, Cotton, Fruits, Imports, Logs, Nursery stock, Plant diseases and pests, Quarantine..., laboratory facilities for pest and disease identification, and in some cases, provide facilities for...) division who inspect articles to ensure they are free of plant pests and diseases and otherwise comply with...

  7. MRP-227 Reactor vessel internals inspection planning and initial results at the Oconee nuclear station unit 2

    International Nuclear Information System (INIS)

    Davidsaver, S.B.; Fyfitch, S.; Whitaker, D.E.; Doss, R.L.

    2015-01-01

    The U.S. PWR industry has pro-actively developed generic inspection requirements and standards for reactor vessel (RV) internals. The Electric Power Research Institute (EPRI) Pressurized Water Reactor (PWR) Materials Reliability Program (MRP) has issued MRP-227-A and MRP-228 with mandatory and needed requirements based on the Nuclear Energy Institute (NEI) document NEI 03-08. The inspection and evaluation guidelines contained in MRP-227-A consider eight age-related degradation mechanisms: stress corrosion cracking (SCC), irradiation-assisted stress corrosion cracking (IASCC), wear, fatigue, thermal aging embrittlement, irradiation embrittlement, void swelling and irradiation growth, and thermal and irradiation-enhanced stress relaxation or irradiation-enhanced creep. This paper will discuss the decision planning efforts required for implementing the MRP-227-A and MRP-228 requirements and the results of these initial inspections at the Oconee Nuclear power station (ONS) units. Duke Energy and AREVA overcame a significant technology and NDE challenge by successfully completing the first-of-a-kind MRP-227-A scope requirements at ONS-1 in one outage below the estimated dose and with zero safety issues or events. This performance was repeated at ONS-2 a year later. The remote NDE tooling and processes developed to examine the MRP-227-A scope for ONS-1 and ONS-2 are transferable to other PWRs

  8. Trouble found in regular inspection of No.1 plant in Ikata Power Station, Shikoku Electric Power Co., Inc

    International Nuclear Information System (INIS)

    1989-01-01

    Since May 2, 1989, the regular inspection of No.1 plant which is a PWR plant with the rated output of 566 MW in Ikata Power Station, Shikoku Electric Power Co., Inc. has been carried out, and eddy current flaw detection inspection was conducted on the total 6585 heating tubes of steam generators except already plugged tubes. As the result, significant indication was observed in 12 heating tubes at the expanded part of the high temperature side tube plates. As to the cause, similarly to those observed in the same plant in the past, it is considered that the residual stress caused by expanding at the time of the manufacture and the internal pressure stress during the operation were superposed, and stress corrosion cracking occurred. It was decided that these 12 defective tubes are plugged. State of plugging in steam generators. Number of total heating tubes: 6776=3388 tubes x 2 steam generators. Number of plugged tubes: 203 including the increase of 12 this time. Ratio of plugging: 3.0 %. Heating tubes: Inconel 600 tubes of φ22.7 mm x 1.27 mm thickness. (K.I.)

  9. Trouble found during regular inspection of No.1 plant in Takahama Power Station, Kansai Electric Power Co., Inc

    International Nuclear Information System (INIS)

    1990-01-01

    No.1 plant in Takahama Power Station, Kansai Electric Power Co., Inc. is a PWR plant with the rated output of 826 MWe. Its regular inspection has been carried out since August 10, 1989, and eddy current flaw detection inspection was performed on the total number of steam generator heating tubes (9619 tubes except already plugged tubes). As the result, significant indication was observed in 6 tubes in the U-bend part, in 6 tubes in the tube-supporting plate part, in 4 tubes in the crevice part in the tube plate, in 9 tubes in the expanded part in the tube plate and in 11 tubes at the boundary of the expanded part, in total in 36 heating tubes, all of them on high temperature side. Consequently, it was decided to plug these 36 defective heating tubes. The heating tubes are those made of Inconel 600, having 22.2 mm outside diameter and 1.27 mm wall thickness. (K.I.)

  10. Troubles detected during regular inspection of No.1 plant in Oi Power Station, Kansai Electric Power Co., Inc

    International Nuclear Information System (INIS)

    1990-01-01

    No. 1 plant in Oi Power Station, Kansai Electric Power Co., Inc. is a PWR plant with rated output of 1175 MW, and its regular inspection is carried out since August 14, 1989. When eddy current flaw detection inspection was carried out on the total number (11426 except already plugged tubes) of the heating tubes of steam generators, significant indication was observed in tube supporting plate part of 279 tubes, at the boundary of tube plate expanded part of 34 tubes, and in the tube plate expanded part of 99 tubes, 411 heating tubes in total (all on high temperature side). Consequently, it was decided to repair 367 tubes using sleeves, and to plug other 44 tubes. Besides, among the heating tubes plugged in the past, it was decided to remove plugs from 161 tubes, and by repairing them with sleeves, to use them again. Total number of heating tubes 13552 (3388 tubes x 4 steam generators), Number of plugged tubes 2009 (decrease by 117 this time), Ratio of plugging 14.8%. (K.I.)

  11. Trouble found during regular inspection of No.3 plant in Mihama Power Station, Kansai Electric Power Co., Inc

    International Nuclear Information System (INIS)

    1990-01-01

    No.3 plant in Mihama Power Station, Kansai Electric Power Co., Inc. is a PWR type plant with the rated output of 826 MWe. Its regular inspection has been carried out since September 11, 1989, and eddy current flaw detection inspection was carried out on the total number of steam generator heating tubes (9997 tubes except already plugged tubes). As the result, significant indication was observed in 24 tubes in the expanded parts in tube plates, and in 36 tubes at the boundary of the expanded parts (all on high temperature side), in total in 60 tubes. Consequently, it was decided to plug these 60 defective heating tubes. The heating tubes are those made of Inconel 600, having 22.2 mm outside diameter and 1.27 mm wall thickness. The total number of heating tubes in 10164 (3388 tubes x 3 steam generators), the number of plugged tubes is 227, and the ratio of plugging is 2.2 %. (K.I.)

  12. Automatic ultrasonic pre-service, and in-service inspection of pressurized components of the primary circuit of nuclear power stations

    International Nuclear Information System (INIS)

    Muller, G.P.; Hallermeier, L.; Heinrich, D.; Grabendorfer, W.; Rebrmann, M.

    1985-01-01

    Ultrasonic pre-service and especially in-service inspection activities on the primary circuit of nuclear power stations form an essential part of the maintenance work that must be performed throughout the lifetime to ensure plant integrity. Consequently, the equipment required to carry out these inspections must be continuously improved in respect of reliability, safety, accuracy and ease of handling in order to minimize disturbances and repairs and reduce radiation exposure of the personnel. The authors' discussion of technique, equipment and performance of automated ultrasonic inspection is based on 15 years of experience in the testing of components of the primary circuit in nuclear power stations. To cover all inspection areas of the RPV of a PWR, four different manipulators are required, two for the closure head, one for the studs and one for the cylindrical shell and bottom closure. The use of the newly developed equipment, which naturally meets all the recommendations of the licensing authorities, allows for the automatic inspection of the components of primary circuit of nuclear power stations and the thus helps to substantially decrease the radiation exposure of the personnel. All the manipulators and their control consoles were designed and manufactured by M.A.N., Nuremberg while the ultrasonic electronic system was developed by Krautkramer, Cologne

  13. Results of special security inspection on improvement of security management setup in Head Office and Tsuruga Nuclear Power Station of the Japan Atomic Power Company and improvement of facilities in Tsuruga Nuclear Power Station

    International Nuclear Information System (INIS)

    1982-01-01

    In connection with the series of accidents in the Tsuruga Nuclear Power Station, the Agency of Natural Resources and Energy had instructed JAPC to make comprehensive inspection on the security management setup and to take improvement measures in the nuclear power station. The results of the subsequent inspection by ANRE confirmed that the improvements made by JAPC are adequate, and the following items are described: improvement of security management setup - communication and reporting in emergency, the management of inspection and maintenance records, work control and supervision in repair, improvement, etc., functional authority and responsibility in maintenance management, operation management, radiation control, personnel education; improvement of facilities - feed water heaters, laundry waste-water filter room, radioactive waste treatment facility, general drainage, concentrated waste liquid storage tanks in newly-built waste treatment building, etc. (J.P.N.)

  14. Eddy current magnetic bias x-probe qualification and inspection of steam generator Monel 400 tubing in Pickering Nuclear Generating Station

    International Nuclear Information System (INIS)

    Lepine, B.A.; Van Langen, J.; Obrutsky, L.

    2006-01-01

    This paper presents an overview of the x-probe MB 350 eddy current inspection array probe, for detection of open OD axial crack-like flaws in Monel 400 tubes at Pickering Nuclear Generating Station. This report contains a selection of inspection results from the field inspections performed with this probe during the 2003 and 2004 period at Pickering Nuclear Generating Station A and B. During the 2003 in-service eddy current inspection results of Pickering Nuclear Generating Station A (PNGS-A) Unit 2, a 13 mm (0.5 inch) long axial indication was detected by the CTR1 bobbin and CTR2-C4 array probes in Tube R25-C52 of Steam Generator (SG) 11 in the hot leg sludge pile region. An experimental magnetic bias X-probe, specially designed by Zetec for inspection of Monel 400 tubing, was deployed and the indication was characterized as a potential out diameter (OD) axially oriented crack. Post-inspection tube pulling and destructive examination confirmed the presence of an Environmentally Assisted Crack (EAC), approximately 80% deep and 13mm long. Due to the significance of this discovery, Ontario Power Generation (OPG) requested AECL to initiate a program for qualification of the X-probe MB 350 for the detection of OD axial cracks in medium to high magnetic permeability μ r Monel 400 PNGS-A and B steam generator tubing at different locations. The X-probe MB 350 subsequently has been deployed as a primary inspection probe for crack detection for PNGS steam generators. (author)

  15. A pilot application of risk-based methods to establish in-service inspection priorities for nuclear components at Surry Unit 1 Nuclear Power Station

    International Nuclear Information System (INIS)

    Vo, T.; Gore, B.; Simonen, F.; Doctor, S.

    1994-08-01

    As part of the Nondestructive Evaluation Reliability Program sponsored by the US Nuclear Regulatory Commission, the Pacific Northwest Laboratory is developing a method that uses risk-based approaches to establish in-service inspection plans for nuclear power plant components. This method uses probabilistic risk assessment (PRA) results and Failure Modes and Effects Analysis (FEMA) techniques to identify and prioritize the most risk-important systems and components for inspection. The Surry Nuclear Power Station Unit 1 was selected for pilot applications of this method. The specific systems addressed in this report are the reactor pressure vessel, the reactor coolant, the low-pressure injection, and the auxiliary feedwater. The results provide a risk-based ranking of components within these systems and relate the target risk to target failure probability values for individual components. These results will be used to guide the development of improved inspection plans for nuclear power plants. To develop inspection plans, the acceptable level of risk from structural failure for important systems and components will be apportioned as a small fraction (i.e., 5%) of the total PRA-estimated risk for core damage. This process will determine target (acceptable) risk and target failure probability values for individual components. Inspection requirements will be set at levels to assure that acceptable failure probabilistics are maintained

  16. High Pressure Coolant Injection (HPCI) System Risk-Based Inspection Guide for Browns Ferry Nuclear Power Station

    International Nuclear Information System (INIS)

    Wong, S.; DiBiasio, A.; Gunther, W.

    1993-09-01

    The High Pressure Coolant Injection (HPCI) system has been examined from a risk perspective. A System Risk-Based Inspection Guide (S-RIG) has been developed as an aid to HPCI system inspections at the Browns Ferry Nuclear Power Plant, Units 1, 2 and 3. The role of. the HPCI system in mitigating accidents is discussed in this S-RIG, along with insights on identified risk-based failure modes which could prevent proper operation of the system. The S-RIG provides a review of industry-wide operating experience, including plant-specific illustrative examples to augment the PRA and operational considerations in identifying a catalogue of basic PRA failure modes for the HPCI system. It is designed to be used as a reference for routine inspections, self-initiated safety system functional inspections (SSFIs), and the evaluation of risk significance of component failures at the nuclear power plant

  17. High Pressure Coolant Injection (HPCI) System Risk-Based Inspection Guide for Browns Ferry Nuclear Power Station

    Energy Technology Data Exchange (ETDEWEB)

    Wong, S.; DiBiasio, A.; Gunther, W. [Brookhaven National Lab., Upton, NY (United States)

    1993-09-01

    The High Pressure Coolant Injection (HPCI) system has been examined from a risk perspective. A System Risk-Based Inspection Guide (S-RIG) has been developed as an aid to HPCI system inspections at the Browns Ferry Nuclear Power Plant, Units 1, 2 and 3. The role of. the HPCI system in mitigating accidents is discussed in this S-RIG, along with insights on identified risk-based failure modes which could prevent proper operation of the system. The S-RIG provides a review of industry-wide operating experience, including plant-specific illustrative examples to augment the PRA and operational considerations in identifying a catalogue of basic PRA failure modes for the HPCI system. It is designed to be used as a reference for routine inspections, self-initiated safety system functional inspections (SSFIs), and the evaluation of risk significance of component failures at the nuclear power plant.

  18. Neural network based inspection of voids and karst conduits in hydro-electric power station tunnels using GPR

    Science.gov (United States)

    Kilic, Gokhan; Eren, Levent

    2018-04-01

    This paper reports on the fundamental role played by Ground Penetrating Radar (GPR), alongside advanced processing and presentation methods, during the tunnel boring project at a Dam and Hydro-Electric Power Station. It identifies from collected GPR data such issues as incomplete grouting and the presence of karst conduits and voids and provides full details of the procedures adopted. In particular, the application of collected GPR data to the Neural Network (NN) method is discussed.

  19. A pilot application of risk-informed methods to establish inservice inspection priorities for nuclear components at Surry Unit 1 Nuclear Power Station. Revision 1

    International Nuclear Information System (INIS)

    Vo, T.V.; Phan, H.K.; Gore, B.F.; Simonen, F.A.; Doctor, S.R.

    1997-02-01

    As part of the Nondestructive Evaluation Reliability Program sponsored by the US Nuclear Regulatory Commission, the Pacific Northwest National Laboratory has developed risk-informed approaches for inservice inspection plans of nuclear power plants. This method uses probabilistic risk assessment (PRA) results to identify and prioritize the most risk-important components for inspection. The Surry Nuclear Power Station Unit 1 was selected for pilot application of this methodology. This report, which incorporates more recent plant-specific information and improved risk-informed methodology and tools, is Revision 1 of the earlier report (NUREG/CR-6181). The methodology discussed in the original report is no longer current and a preferred methodology is presented in this Revision. This report, NUREG/CR-6181, Rev. 1, therefore supersedes the earlier NUREG/CR-6181 published in August 1994. The specific systems addressed in this report are the auxiliary feedwater, the low-pressure injection, and the reactor coolant systems. The results provide a risk-informed ranking of components within these systems

  20. Cooperative Station History Forms

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Various forms, photographs and correspondence documenting the history of Cooperative station instrumentation, location changes, inspections, and...

  1. 14 CFR 145.223 - FAA inspections.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false FAA inspections. 145.223 Section 145.223... OTHER CERTIFICATED AGENCIES REPAIR STATIONS Operating Rules § 145.223 FAA inspections. (a) A certificated repair station must allow the FAA to inspect that repair station at any time to determine...

  2. Remote inspection system for nuclear power plants

    International Nuclear Information System (INIS)

    Inagaki, K.; Fujii, M.; Doi, A.; Harima, T.

    1977-01-01

    A remote inspection system for nuclear power plants was constructed based on an analysis of inspections performed by an operator on patrol. This system consists of an operator's console and a remote station. The remote station, equipped with five kinds of sensors, is steered along the inspection route by a photoelectric guiding system or may be manually controlled from an operator's console in a main control room. Signals for control and inspection data are multiplexed and transmitted through a coaxial cable

  3. Inspection Database

    Data.gov (United States)

    U.S. Department of Health & Human Services — FDA is disclosing the final inspection classification for inspections related to currently marketed FDA-regulated products. The disclosure of this information is not...

  4. No effects of power line frequency extremely low frequency electromagnetic field exposure on selected neurobehavior tests of workers inspecting transformers and distribution line stations versus controls.

    Science.gov (United States)

    Li, Li; Xiong, De-fu; Liu, Jia-wen; Li, Zi-xin; Zeng, Guang-cheng; Li, Hua-liang

    2014-03-01

    We aimed to evaluate the interference of 50 Hz extremely low frequency electromagnetic field (ELF-EMF) occupational exposure on the neurobehavior tests of workers performing tour-inspection close to transformers and distribution power lines. Occupational short-term "spot" measurements were carried out. 310 inspection workers and 300 logistics staff were selected as exposure and control. The neurobehavior tests were performed through computer-based neurobehavior evaluation system, including mental arithmetic, curve coincide, simple visual reaction time, visual retention, auditory digit span and pursuit aiming. In 500 kV areas electric field intensity at 71.98% of total measured 590 spots were above 5 kV/m (national occupational standard), while in 220 kV areas electric field intensity at 15.69% of total 701 spots were above 5 kV/m. Magnetic field flux density at all the spots was below 1,000 μT (ICNIRP occupational standard). The neurobehavior score changes showed no statistical significance. Results of neurobehavior tests among different age, seniority groups showed no significant changes. Neurobehavior changes caused by daily repeated ELF-EMF exposure were not observed in the current study.

  5. Inspection planning

    International Nuclear Information System (INIS)

    Korosec, D.; Levstek, M.F.

    2001-01-01

    Slovenian Nuclear Safety Administration (SNSA) division of nuclear and radiological safety inspection has developed systematic approach to their inspections. To be efficient in their efforts regarding regular and other types of inspections, in past years, the inspection plan has been developed. It is yearly based and organized on a such systematic way, that all areas of nuclear safety important activities of the licensee are covered. The inspection plan assures appropriate preparation for conducting the inspections, allows the overview of the progress regarding the areas to be covered during the year. Depending on the licensee activities and nature of facility (nuclear power plant, research reactor, radioactive waste storage, others), the plan has different levels of intensity of inspections and also their frequency. One of the basic approaches of the plan is to cover all nuclear and radiological important activities on such way, that all regulatory requests are fulfilled. In addition, the inspection plan is a good tool to improve inspection effectiveness based on previous experience and allows to have the oversight of the current status of fulfillment of planned inspections. Future improvement of the plan is necessary in the light of newest achievements on this field in the nuclear world, that means, new types of inspections are planned and will be incorporated into plan in next year.(author)

  6. Inspection vehicle

    International Nuclear Information System (INIS)

    Takahashi, Masaki; Omote, Tatsuyuki; Yoneya, Yutaka; Tanaka, Keiji; Waki, Tetsuro; Yoshida, Tomiji; Kido, Tsuyoshi.

    1993-01-01

    An inspection vehicle comprises a small-sized battery directly connected with a power motor or a direct power source from trolly lines and a switching circuit operated by external signals. The switch judges advance or retreat by two kinds of signals and the inspection vehicle is recovered by self-running. In order to recover the abnormally stopped inspection vehicle to the targeted place, the inspection vehicle is made in a free-running state by using a clutch mechanism and is pushed by an other vehicle. (T.M.)

  7. 47 CFR 73.1201 - Station identification.

    Science.gov (United States)

    2010-10-01

    ... public file. The notice must state that the station's public file is available for inspection and that consumers can view it at the station's main studio and on its Web site. At least one of the announcements...

  8. Ultrasonic inspection

    International Nuclear Information System (INIS)

    Satittada, Gannaga

    1984-01-01

    Ultrasonic inspection is one of the most widely used methods for nondestructive inspection. The beam of high-frequency sound wave, ultrasonic wave, is introduced into the material. It travels through the material with some attendant loss of energy and can be reflected at interfaces. The reflected beam is detected and analyzed. Ultrasonic inspection is used to detect flaws in metal parts as well as in welded, brazed and bonded joints during research work and developing production and service. It is also used to detect and locate porosity, pipe, and flakes. In addition, it can be used for the measurement of metal thickness. Ultrasonic inspection is therefore used for quality control and material inspection in all major industries

  9. Hospital Inspections

    Data.gov (United States)

    U.S. Department of Health & Human Services — Welcome to hospitalinspections.org, a website run by the Association of Health Care Journalists (AHCJ) that aims to make federal hospital inspection reports easier...

  10. Operational inspections

    International Nuclear Information System (INIS)

    Bystersky, M.

    1997-01-01

    Special equipment is described, designed for inspection of reactor pressure vessels performed from the inside. Central shaft manipulator ZMM-5 is available for crack detection control using ultrasound and eddy currents, for visual check of surfaces, repair works at the reactor pressure vessel, and hardness measurements. The manipulator consists of the manipulator bridge, a cable container, shaft segments, a control mechanism and auxiliary parts. Eight inspections were performed at the Bohunice nuclear power plant and two at the Paks nuclear power plant. (M.D.)

  11. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    Whittle, J.

    1982-11-01

    The non-destructive testing of components for the proposed Sizewell B nuclear power station is discussed. Issues considered include: non-destructive testing techniques available; inspection of ferritic steel components during fabrication; reliability of the ultrasonic inspection of ferritic structures; inspection of components of austenitic steel; in-service inspection of the reactor coolant system. (U.K.)

  12. The Ontario hydro low pressure turbine disc inspection program automated ultrasonic inspection systems - an overview

    International Nuclear Information System (INIS)

    Huggins, J.W.; Chopcian, M.; Grabish, M.

    1990-01-01

    An overview of the Ontario Hydro Low Pressure Turbine Disc Inspection Program is presented. The ultrasonic inspection systems developed in-house to inspect low pressure turbine discs at Pickering and Bruce Nuclear Generating stations are described. Three aspects of the program are covered: PART I - Background to inspection program, disc cracking experience, and development of an in-house inspection capability: PART II - System development requirements; ultrasonic equipment, electromechanical subsystems and instrumentation console: PART III - Customized software for flaw detection, sizing, data acquisition/storage, advanced signal processing, reports, documentation and software based diagnostics

  13. 47 CFR 80.59 - Compulsory ship inspections.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Compulsory ship inspections. 80.59 Section 80... STATIONS IN THE MARITIME SERVICES Applications and Licenses § 80.59 Compulsory ship inspections. (a) Inspection of ships subject to the Communications Act or the Safety Convention. (1) The FCC will not normally...

  14. Enhanced InService Inspection system for BWR plant

    International Nuclear Information System (INIS)

    Shouji, Hajime; Kobayashi, Teruo; Nagao, Tetsuya

    1993-01-01

    An enhanced InService Inspection system (ISI) has been developed, consisting of newly designed automated scanners, automated pipe inspection system and a high speed data acquisition/analysis station. This system uses a trackless magnetic crawler type nozzle inspection scanner attached to the nozzle shoulder by magnetic wheels. The automated pipe inspection system consists of an automated scanner, controller and high speed data acquisition station. These advanced automatic inspection systems are very useful for ISI, especially in reducing the radiation exposure and time required. (author)

  15. Holographic inspection of nuclear plant

    International Nuclear Information System (INIS)

    Gordon, A.L.; Armour, I.A.; Glanville, R.; Malcolm, G.J.; Wright, D.G.

    1988-01-01

    The high resolution, enormous depth of field and high tolerance to radiation of holography mean that it has great potential as an inspection tool in the nuclear industry. In addition, the ability of double-pulse holography to yield detailed information on vibration over the whole field of both large and small structures provides measurements that often cannot be obtained in any other way. This paper reviews the development of equipment for the holographic inspection of nuclear fuel elements; a portable holocamera for use inside reactors; and the application of holographic techniques for vibration measurements in a nuclear power station. (author)

  16. Improvement of foundation for inspection

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-08-15

    Japan Nuclear Energy Safety Organization has been carrying out improvement of inspection system for nuclear plants in Japan since 2003FY. The new inspection system was introduced into nuclear power plants in{sub -}2008FY. In this project, improvement of comprehensive plant performance assessment and management tool for the new inspection system are developed. In 2012FY, a trend analysis method of the plant performance was developed with reference to the IAEA literature. And the trend analysis was tried based on the results of the comprehensive plant performance assessment of all domestic plants except Fukushima-Daiichi Nuclear Power Station. In addition, the teaching materials for QMS training guideline were made. And improvement of a quality management system evaluation support tool was performed. (author)

  17. Improvement of foundation for inspection

    International Nuclear Information System (INIS)

    2013-01-01

    Japan Nuclear Energy Safety Organization has been carrying out improvement of inspection system for nuclear plants in Japan since 2003FY. The new inspection system was introduced into nuclear power plants in - 2008FY. In this project, improvement of comprehensive plant performance assessment and management tool for the new inspection system are developed. In 2012FY, a trend analysis method of the plant performance was developed with reference to the IAEA literature. And the trend analysis was tried based on the results of the comprehensive plant performance assessment of all domestic plants except Fukushima-Daiichi Nuclear Power Station. In addition, the teaching materials for QMS training guideline were made. And improvement of a quality management system evaluation support tool was performed. (author)

  18. Tire inspection system with shielded x-ray source

    International Nuclear Information System (INIS)

    Heisner, D.N.; Palermo, A. Jr.; Loyer, P.K.

    1976-01-01

    An automated tire inspection system is described which employs a penetrative radiation, such as x-radiation, to inspect the integrity of portions of tires fed sequentially along a feed path through a centering station and into a shielded enclosure where an inspection station is defined. Features of the system include a continuously operating x-ray source movable between inspection and retracted positions, and an x-ray shield for covering the source when it is retracted to permit the doors of the shielded enclosure to be opened without danger from escaping radiation. 19 Claims, 38 Drawing Figures

  19. ACEC: remote inspection, remote intervention, autonomous vehicle

    International Nuclear Information System (INIS)

    Anon.

    1986-01-01

    Early in 1979, the accident at the TMI-2 nuclear power station focused attention on the lack of inspection and intervention means in containments where high radiation levels do not allow the entrance of humans. Recent years have seen a trend towards significant developments in the application of robotic technology to maintenance and inspection in nuclear facilities. This paper presents the general development concept and the technical specifications of a mobile robot [fr

  20. Application and study of advanced network technology in large container inspection system

    International Nuclear Information System (INIS)

    Li Zheng; Kang Kejun; Gao Wenhuan; Wang Jingjin

    1996-01-01

    Large Container Inspection System (LCIS) based on radiation imaging technology is a powerful tool for the customs to check the contents inside a large container without opening it. An image distributed network system is composed of center manager station, image acquisition station, environment control station, inspection processing station, check-in station, check-out station, database station by using advanced network technology. Mass data, such as container image data, container general information, manifest scanning data, commands and status, must be on-line transferred between different stations. Advanced network technology and software programming technique are presented

  1. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    Smedley, G.P.

    1982-11-01

    A description is given of the role of Lloyd's Register of Shipping as Independent Inspection Agency for the primary circuit of the PWR for the proposed Sizewell B power station. Topics discussed include: Lloyd's Register of Shipping and its functions; the Independent Inspection Agency and its functions; fabrication of the reactor pressure vessel; inspection on site at Sizewell. (U.K.)

  2. Rail inspection system based on iGPS

    Science.gov (United States)

    Fu, Xiaoyan; Wang, Mulan; Wen, Xiuping

    2018-05-01

    Track parameters include gauge, super elevation, cross level and so on, which could be calculated through the three-dimensional coordinates of the track. The rail inspection system based on iGPS (indoor/infrared GPS) was composed of base station, receiver, rail inspection frame, wireless communication unit, display and control unit and data processing unit. With the continuous movement of the inspection frame, the system could accurately inspect the coordinates of rail; realize the intelligent detection and precision measurement. According to principle of angle intersection measurement, the inspection model was structured, and detection process was given.

  3. Fire Stations

    Data.gov (United States)

    Department of Homeland Security — Fire Stations in the United States Any location where fire fighters are stationed or based out of, or where equipment that such personnel use in carrying out their...

  4. Additive Manufacturing Infrared Inspection

    Science.gov (United States)

    Gaddy, Darrell; Nettles, Mindy

    2015-01-01

    The Additive Manufacturing Infrared Inspection Task started the development of a real-time dimensional inspection technique and digital quality record for the additive manufacturing process using infrared camera imaging and processing techniques. This project will benefit additive manufacturing by providing real-time inspection of internal geometry that is not currently possible and reduce the time and cost of additive manufactured parts with automated real-time dimensional inspections which deletes post-production inspections.

  5. Nuclear fuel pellet inspection system

    International Nuclear Information System (INIS)

    Ahmed, H.J.; Beatty, J.M.; Kugler, R.W.

    1992-01-01

    At least one axially extending linear portion of the peripheral surface of the pellet is optically sensed, a set of digital values representative of the pellet surface is generated, and the set is compared to a predetermined standard. Groups of adjacent locations on the surface of the pellet having values greater or less than the predetermined standard are identified, and the pellet is rejected, when a flawed area exceeds a predetermined size. During inspection, the pellet is moved axially through an inspection station by parallel support rolls, spaced by a distance less than the pellet diameter. The rolls are rotated upward and outward from each other, rotating the pellet, and chain dogs are positioned between the spaced rolls for engaging a pellet and moving it along the rolls. The pellet is rejected if its peripheral surface area is too great, and a reference pellet may be used. (author)

  6. Amtrak Stations

    Data.gov (United States)

    Department of Homeland Security — Updated database of the Federal Railroad Administration's (FRA) Amtrak Station database. This database is a geographic data set containing Amtrak intercity railroad...

  7. An Articulated Inspection Arm for fusion purposes

    International Nuclear Information System (INIS)

    Villedieu, E.; Bruno, V.; Pastor, P.; Gargiulo, L.; Song, Y.T.; Cheng, Y.; Feng, H.; Liu, C.; Shi, S.S.

    2016-01-01

    Highlights: • Requirements for in vacuum tokamak inspection are presented. • Development of a prototype of the Articulated Inspection Arm is described. • The upgrade of the prototype to convert it into a fully operational device is detailed. • Future applications of inspection robots in the new fusion reactors is discussed. - Abstract: Fusion Tokamaks are complex machines which require special conditions for their operation, in particular, high vacuum inside the vessel and high temperature of the vessel walls. During plasma phases, the first wall components are highly stressed and a control is necessary in case of doubt about their condition. To be able to make safely such an inspection in a short period of time is a great advantage. The Articulated Inspection Arm (AIA) developed by the CEA provides the capability for fast inspections of the first wall overall surface keeping the vacuum and temperature conditions of the vessel. The robot prototype was validated in Tore Supra in 2008. In the frame of a joint laboratory, CEA/IRFM and ASIPP have decided to upgrade the existing AIA prototype to use it routinely in the EAST and WEST tokamaks. The robot has followed an important upgrade program in 2013 and 2014. The document presents the various upgrades made on the mechanics, the sensors, the electronics, the control station and the integration adaptation for the operation on EAST. From the AIA experience, thoughts for future inspection robots are given.

  8. An Articulated Inspection Arm for fusion purposes

    Energy Technology Data Exchange (ETDEWEB)

    Villedieu, E., E-mail: eric.villedieu@cea.fr [CEA-IRFM, 13108 Saint Paul lez Durance (France); Bruno, V.; Pastor, P.; Gargiulo, L. [CEA-IRFM, 13108 Saint Paul lez Durance (France); Song, Y.T.; Cheng, Y.; Feng, H. [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei (China); Liu, C. [CEA-IRFM, 13108 Saint Paul lez Durance (France); Institute of Plasma Physics, Chinese Academy of Sciences, Hefei (China); Shi, S.S. [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei (China)

    2016-11-01

    Highlights: • Requirements for in vacuum tokamak inspection are presented. • Development of a prototype of the Articulated Inspection Arm is described. • The upgrade of the prototype to convert it into a fully operational device is detailed. • Future applications of inspection robots in the new fusion reactors is discussed. - Abstract: Fusion Tokamaks are complex machines which require special conditions for their operation, in particular, high vacuum inside the vessel and high temperature of the vessel walls. During plasma phases, the first wall components are highly stressed and a control is necessary in case of doubt about their condition. To be able to make safely such an inspection in a short period of time is a great advantage. The Articulated Inspection Arm (AIA) developed by the CEA provides the capability for fast inspections of the first wall overall surface keeping the vacuum and temperature conditions of the vessel. The robot prototype was validated in Tore Supra in 2008. In the frame of a joint laboratory, CEA/IRFM and ASIPP have decided to upgrade the existing AIA prototype to use it routinely in the EAST and WEST tokamaks. The robot has followed an important upgrade program in 2013 and 2014. The document presents the various upgrades made on the mechanics, the sensors, the electronics, the control station and the integration adaptation for the operation on EAST. From the AIA experience, thoughts for future inspection robots are given.

  9. Automated Inspection of Aircraft

    Science.gov (United States)

    1998-04-01

    This report summarizes the development of a robotic system designed to assist aircraft inspectors by remotely deploying non-destructive inspection (NDI) sensors and acquiring, processing, and storing inspection data. Carnegie Mellon University studie...

  10. Optimising import phytosanitary inspection

    NARCIS (Netherlands)

    Surkov, I.

    2007-01-01

    Keywords: quarantine pest, plant health policy, optimization, import phytosanitary inspection, ‘reduced checks’, optimal allocation of resources, multinomial logistic regression, the Netherlands World trade is a major vector of spread of quarantine plant pests. Border phytosanitary inspection

  11. Methodology for the inspection of items important to safety

    International Nuclear Information System (INIS)

    Ishack, G.

    1981-11-01

    A description is given of the inspection methods adopted by the Canadian Atomic Energy Control Board. From the outset of the industry in Canada, resident officers have been assigned to nuclear power stations. These inspectors have unlimited access to equipment, documents and personnel at the station. They work closely with Head Office specialists, provincial authorities, and private consultants

  12. Technical objectives of inspection

    International Nuclear Information System (INIS)

    Sorenson, R.J.; Stewart, K.B.; Schneider, R.A.

    1976-01-01

    The various technical objectives of inspection are discussed in a very general manner. The discussion includes how the inspection function is related to the assumed threat, the various degrees of assurance and reliance on criteria, and the hierarchy of assurance which is obtained from the various types or levels of inspection

  13. Software Formal Inspections Guidebook

    Science.gov (United States)

    1993-01-01

    The Software Formal Inspections Guidebook is designed to support the inspection process of software developed by and for NASA. This document provides information on how to implement a recommended and proven method for conducting formal inspections of NASA software. This Guidebook is a companion document to NASA Standard 2202-93, Software Formal Inspections Standard, approved April 1993, which provides the rules, procedures, and specific requirements for conducting software formal inspections. Application of the Formal Inspections Standard is optional to NASA program or project management. In cases where program or project management decide to use the formal inspections method, this Guidebook provides additional information on how to establish and implement the process. The goal of the formal inspections process as documented in the above-mentioned Standard and this Guidebook is to provide a framework and model for an inspection process that will enable the detection and elimination of defects as early as possible in the software life cycle. An ancillary aspect of the formal inspection process incorporates the collection and analysis of inspection data to effect continual improvement in the inspection process and the quality of the software subjected to the process.

  14. Remote controlled ultrasonic pre-service and in-service inspections of reactor pressure vessels

    International Nuclear Information System (INIS)

    Mueller, G.

    1990-01-01

    The first mechanised in-service inspection of the reactor pressure vessel on unit one of Eskom's Koeberg nuclear power station has been carried out. Since 1968 a whole range of manipulators to carry out remote controlled ultrasonic inspections of nuclear power station equipment has been developed. The inspection of a reactor pressure vessel using a central mast manipulator is described. 3 figs., 1 ill

  15. Randomization of inspections

    International Nuclear Information System (INIS)

    Markin, J.T.

    1989-01-01

    As the numbers and complexity of nuclear facilities increase, limitations on resources for international safeguards may restrict attainment of safeguards goals. One option for improving the efficiency of limited resources is to expand the current inspection regime to include random allocation of the amount and frequency of inspection effort to material strata or to facilities. This paper identifies the changes in safeguards policy, administrative procedures, and operational procedures that would be necessary to accommodate randomized inspections and identifies those situations where randomization can improve inspection efficiency and those situations where the current nonrandom inspections should be maintained. 9 refs., 1 tab

  16. Revised inspection program for nuclear power plants

    International Nuclear Information System (INIS)

    1978-01-01

    The United States Nuclear Regulatory Commission (NRC) regulates nuclear power plants to assure adequate protection of the public and the environment from the dangers associated with nuclear materials. NRC fulfills this responsibility through comprehensive safety reviews of nuclear facilities, licensing of organizations that use nuclear materials, and continuing inspection. The NRC inspection program is currently conducted from the five regional offices in or near Philadelphia, Atlanta, Chicago, Dallas and San Francisco. Inspectors travel from the regional offices to nuclear power plants in various phases of construction, test and operation in order to conduct inspections. However, in June 1977 the Commission approved a revision to the inspection program that will include stationing inspectors at selected plants under construction and at all plants in operation. In addition, the revised program provides for appraising the performance of licensees on a national basis and involves more direct measurement and observation by NRC inspectors of work and tests in progress. The program also includes enhanced career management consisting of improved training and career development for inspectors and other professionals. The report was requested in the Conference Report on the NRC Authorization for Appropriations for Fiscal Year 1978. The report provides a discussion of the basis for both the current and revised inspection programs, describes these programs, and shows how the NRC inspection force will be trained and utilized. In addition, the report includes a discussion of the actions that will be taken to assure the objectivity of inspectors

  17. Station Capacity

    DEFF Research Database (Denmark)

    Landex, Alex

    2011-01-01

    the probability of conflicts and the minimum headway times into account. The last method analyzes how optimal platform tracks are used by examining the arrival and departure pattern of the trains. The developed methods can either be used separately to analyze specific characteristics of the capacity of a station......Stations are often limiting the capacity of railway networks. This is due to extra need of tracks when trains stand still, trains turning around, and conflicting train routes. Although stations are often the capacity bottlenecks, most capacity analysis methods focus on open line capacity. Therefore...... for platform tracks and the probability that arriving trains will not get a platform track immediately at arrival. The third method is a scalable method that analyzes the conflicts in the switch zone(s). In its simplest stage, the method just analyzes the track layout while the more advanced stages also take...

  18. Method and apparatus for inspecting tires

    International Nuclear Information System (INIS)

    Fox, R.L.T.

    1975-01-01

    A method and apparatus for inspecting tires by the use of x-rays is disclosed in which a tire is advanced to an inspection station, engaged along opposite bead rims and inflated to axially spread the bead rims and side walls. An x-ray source is advanced axially into the tire and the tire is eccentrically rotated relative to the x-ray source to enable radial positioning of the source relative to the tire near the tire bead rim diameter without requiring radial movement of the x-ray source. The x-ray source produces an x-ray beam which sweeps about the interior of the expanded tire from bead rim to bead rim while the tire is rotated about its centerline. An x-ray detection system detects x-rays which have penetrated the wall and produces inspection information concerning the tire construction. (Patent Office Record)

  19. A stereoscopic television system for reactor inspection

    International Nuclear Information System (INIS)

    Friend, D.B.; Jones, A.

    1980-03-01

    A stereoscopic television system suitable for reactor inspection has been developed. Right and left eye views, obtained from two conventional black and white cameras, are displayed by the anaglyph technique and observers wear appropriately coloured viewing spectacles. All camera functions, such as zoom, focus and toe-in are remotely controlled. A laboratory experiment is described which demonstrates the increase in spatial awareness afforded by the use of stereo television and illustrates its potential in the supervision of remote handling tasks. Typical depth resolutions of 3mm at 1m and 10mm at 2m have been achieved with the reactor instrument. Trials undertaken during routine inspection at Oldbury Power Station in June 1978 are described. They demonstrate that stereoscopic television can indeed improve the convenience of remote handling and that the added display realism is beneficial in visual inspection. (author)

  20. Optical fiber inspection system

    Science.gov (United States)

    Moore, Francis W.

    1987-01-01

    A remote optical inspection system including an inspection head. The inspection head has a passageway through which pellets or other objects are passed. A window is provided along the passageway through which light is beamed against the objects being inspected. A plurality of lens assemblies are arranged about the window so that reflected light can be gathered and transferred to a plurality of coherent optical fiber light guides. The light guides transfer the light images to a television or other image transducer which converts the optical images into a representative electronic signal. The electronic signal can then be displayed on a signal viewer such as a television monitor for inspection by a person. A staging means can be used to support the objects for viewing through the window. Routing means can be used to direct inspected objects into appropriate exit passages for accepted or rejected objects. The inspected objects are advantageously fed in a singular manner to the staging means and routing means. The inspection system is advantageously used in an enclosure when toxic or hazardous materials are being inspected.

  1. 46 CFR 153.812 - Inspection for Certificate of Inspection.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Inspection for Certificate of Inspection. 153.812... CARGOES SHIPS CARRYING BULK LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Testing and Inspection § 153.812 Inspection for Certificate of Inspection. The rules governing the...

  2. Technical regulation of nondestructive inspection

    International Nuclear Information System (INIS)

    1995-01-01

    It starts with the explanation of definition of nondestructive inspection and qualifications for a inspection. It lists the technical regulations of nondestructive inspections which are radiographic testing, ultrasonic flaw detecting test, liquid penetrant test, magnetic particle inspection, eddy current test visual inspection and leakage test.

  3. Health products inspection

    International Nuclear Information System (INIS)

    Stoltz, M.

    2009-01-01

    To protect public health, the Health Products Inspection is a public service mission where the application of regulations concerning activities on human health products and cosmetic products is verified. This mission permits a global approach to assess the health products risk-based benefit and, in monitoring by laboratory testing and by on site inspections, to verify their compliance with appropriate regulations. The seventy five inspectors perform about eight hundred inspections per year, in France and abroad. These inspections are related to data provided in the health products assessment and also to manufacturing and delivery practices. The French inspection body is also involved in the training of foreign inspectors and in the harmonization of national, European and international practices either for operators than for the competent authorities. (author)

  4. Power stations

    International Nuclear Information System (INIS)

    Cawte, H.; Philpott, E.F.

    1980-01-01

    The object is to provide a method of operating a dual purpose power station so that the steam supply system is operated at a high load factor. The available steam not required for electricity generation is used to provide process heat and the new feature is that the process plant capacity is determined to make the most economic use of the steam supply system, and not to match the passout capacity of the turbine of the turbogenerator. The product of the process plant should, therefore, be capable of being stored. A dual-purpose power station with a nuclear-powered steam source, turbogenerating means connected to the steam source and steam-powered process plant susceptible to wide variation in its rate of operation is described. (U.K.)

  5. Automated ultrasonic shop inspection of reactor pressure vessel forgings

    International Nuclear Information System (INIS)

    Farley, J.M.; Dikstra, B.J.; Hanstock, D.J.; Pople, C.H.

    1986-01-01

    Automated ultrasonic shop inspection utilizing a computer-controlled system is being applied to each of the forgings for the reactor pressure vessel of the proposed Sizewell B PWR power station. Procedures which utilize a combination of high sensitivity shear wave pulse echo, 0 degrees and 70 degrees angled longitudinal waves, tandem and through-thickness arrays have been developed to provide comprehensive coverage and an overall reliability of inspection comparable to the best achieved in UKAEA defect detection trials and in PISC II. This paper describes the ultrasonic techniques, the automated system (its design, commissioning and testing), validation and the progress of the inspections

  6. Hydro-Quebec inspection robot RIT-LRG

    International Nuclear Information System (INIS)

    Champagne, D.; Rinfret, F.; Bourgault, Y.G.

    2008-01-01

    Hydro Quebec's Research Centre (IREQ), has developed a variety of inspection tools over the years. The Metar bracelet for the feeder tubes, the REC robot for the heat exchanger and the RIT robot for the Delayed Neutron system just to name a few. This paper discusses with the successful deployment of the Camera Probe Positioning robot for Visual Inspection of the sample lines of the delayed neutron system of CANDU power plants. This RIT robot has three possible configurations (Face, Cabinet and LRG configurations) and has remained a prototype version although it has been used over the years in many outage inspection campaigns since 1997. The main advantages of using this robot are: the significant reduction in radiation exposure, the high quality of the data collected and the archiving of inspection data for further analysis and reports. In 2007, Gentilly-2 (G-2), decided to industrialize the LRG configuration of the RIT robot and to designate it the standard tool for the inspection of the Delayed Neutron System. An improved RIT-LRG robot, along with its control box and command station was developed. The software had to be rewritten requiring an ergonomics analysis of user tasks, work station and interface display. These issues included both physical and cognitive requirements aspects. The two principal topics of this paper will be on the Inspection Robot Technology developed and highlights of the 2008 outage inspection campaign. (author)

  7. Hydro-Quebec inspection robot RIT-LRG

    Energy Technology Data Exchange (ETDEWEB)

    Champagne, D., E-mail: champagne.dominique@ireq.ca [Inst. de recherche d' Hydro-Quebec, Quebec (Canada); Rinfret, F.; Bourgault, Y.G., E-mail: rinfret.francois@hydro.qc.ca, E-mail: bourgault.yves.g@hydro.qc.ca [Hydro-Quebec, Becancour, Quebec (Canada)

    2008-07-01

    Hydro Quebec's Research Centre (IREQ), has developed a variety of inspection tools over the years. The Metar bracelet for the feeder tubes, the REC robot for the heat exchanger and the RIT robot for the Delayed Neutron system just to name a few. This paper discusses with the successful deployment of the Camera Probe Positioning robot for Visual Inspection of the sample lines of the delayed neutron system of CANDU power plants. This RIT robot has three possible configurations (Face, Cabinet and LRG configurations) and has remained a prototype version although it has been used over the years in many outage inspection campaigns since 1997. The main advantages of using this robot are: the significant reduction in radiation exposure, the high quality of the data collected and the archiving of inspection data for further analysis and reports. In 2007, Gentilly-2 (G-2), decided to industrialize the LRG configuration of the RIT robot and to designate it the standard tool for the inspection of the Delayed Neutron System. An improved RIT-LRG robot, along with its control box and command station was developed. The software had to be rewritten requiring an ergonomics analysis of user tasks, work station and interface display. These issues included both physical and cognitive requirements aspects. The two principal topics of this paper will be on the Inspection Robot Technology developed and highlights of the 2008 outage inspection campaign. (author)

  8. Runway Inspection by RPAS

    Directory of Open Access Journals (Sweden)

    Stanislav Absolon

    2015-10-01

    Full Text Available This article discusses the use of the RPAS for the inspection of the airport operating areas. The paper compares the current process of the inspection of the airport operating areas by the airport staff with the possibilities which are offered by the use of the modern technology RPAS. The following text also describes how to inspect airport operating areas by the RPAS, specific technical possibilities and the applicable technical solutions. Furthermore there are variants of piloting the RPAS, comparing usable equipment, equipment for video recording and the possibility of using thermal imaging camera in the article.

  9. Magnetic rubber inspection (MRI)

    International Nuclear Information System (INIS)

    Carro, L.

    1997-01-01

    Magnetic Rubber Inspection (MRI) was developed to inspect for small cracks and flaws encountered in high performance aircraft. A formula of very fine magnetic particles immersed in a room temperature curing rubber is catalysed and poured into dams (retainers) on the surface of the part to be inspected. Inducing a magnetic field then causes the particles to be drawn to discontinuities in the component under test. These indicating particles are held to the discontinuity by magnetic attraction, as the rubber cures. The solid rubber cast (Replica) is then removed and examined under a microscope for indicating lines of particle concentrations. 3 refs., 6 figs

  10. Automated PCB Inspection System

    Directory of Open Access Journals (Sweden)

    Syed Usama BUKHARI

    2017-05-01

    Full Text Available Development of an automated PCB inspection system as per the need of industry is a challenging task. In this paper a case study is presented, to exhibit, a proposed system for an immigration process of a manual PCB inspection system to an automated PCB inspection system, with a minimal intervention on the existing production flow, for a leading automotive manufacturing company. A detailed design of the system, based on computer vision followed by testing and analysis was proposed, in order to aid the manufacturer in the process of automation.

  11. Wheel inspection system environment.

    Science.gov (United States)

    2008-11-18

    International Electronic Machines Corporation (IEM) has developed and is now marketing a state-of-the-art Wheel Inspection System Environment (WISE). WISE provides wheel profile and dimensional measurements, i.e. rim thickness, flange height, flange ...

  12. Information-Driven Inspections

    International Nuclear Information System (INIS)

    Laughter, Mark D.; Whitaker, J. Michael; Lockwood, Dunbar

    2010-01-01

    New uranium enrichment capacity is being built worldwide in response to perceived shortfalls in future supply. To meet increasing safeguards responsibilities with limited resources, the nonproliferation community is exploring next-generation concepts to increase the effectiveness and efficiency of safeguards, such as advanced technologies to enable unattended monitoring of nuclear material. These include attribute measurement technologies, data authentication tools, and transmission and security methods. However, there are several conceptual issues with how such data would be used to improve the ability of a safeguards inspectorate such as the International Atomic Energy Agency (IAEA) to reach better safeguards conclusions regarding the activities of a State. The IAEA is pursuing the implementation of information-driven safeguards, whereby all available sources of information are used to make the application of safeguards more effective and efficient. Data from continuous, unattended monitoring systems can be used to optimize on-site inspection scheduling and activities at declared facilities, resulting in fewer, better inspections. Such information-driven inspections are the logical evolution of inspection planning - making use of all available information to enhance scheduled and randomized inspections. Data collection and analysis approaches for unattended monitoring systems can be designed to protect sensitive information while enabling information-driven inspections. A number of such inspections within a predetermined range could reduce inspection frequency while providing an equal or greater level of deterrence against illicit activity, all while meeting operator and technology holder requirements and reducing inspector and operator burden. Three options for using unattended monitoring data to determine an information-driven inspection schedule are to (1) send all unattended monitoring data off-site, which will require advances in data analysis techniques to

  13. Ultrasonic inspection experience of steam generator tubes at Ontario Hydro and the TRUSTIE inspection system

    International Nuclear Information System (INIS)

    Choi, E.I.; Jansen, D.

    1998-01-01

    Ontario Hydro have been using ultrasonic test (UT) technique to inspect steam generator (SG) tubes since 1993. The UT technique has higher sensitivity in detecting flaws in SG tubes and can characterize the flaws with higher accuracy. Although an outside contractor was used initially, Ontario Hydro has been using a self-developed system since 1995. The TRUSTIE system (Tiny Rotating UltraSonic Tube Inspection Equipment) was developed by Ontario Hydro Technologies specifically for 12.7 mm outside diameter (OD) tubes, and later expanded to larger tubes. To date TRUSTIE has been used in all of Ontario Hydro's nuclear generating stations inspecting for flaws such as pitting, denting, and cracks at top-of-tubesheet to the U-bend region. (author)

  14. Estimation of inspection effort

    International Nuclear Information System (INIS)

    Mullen, M.F.; Wincek, M.A.

    1979-06-01

    An overview of IAEA inspection activities is presented, and the problem of evaluating the effectiveness of an inspection is discussed. Two models are described - an effort model and an effectiveness model. The effort model breaks the IAEA's inspection effort into components; the amount of effort required for each component is estimated; and the total effort is determined by summing the effort for each component. The effectiveness model quantifies the effectiveness of inspections in terms of probabilities of detection and quantities of material to be detected, if diverted over a specific period. The method is applied to a 200 metric ton per year low-enriched uranium fuel fabrication facility. A description of the model plant is presented, a safeguards approach is outlined, and sampling plans are calculated. The required inspection effort is estimated and the results are compared to IAEA estimates. Some other applications of the method are discussed briefly. Examples are presented which demonstrate how the method might be useful in formulating guidelines for inspection planning and in establishing technical criteria for safeguards implementation

  15. Packaging supplier inspection guide

    International Nuclear Information System (INIS)

    Stromberg, H.M.; Gregg, R.E.; Kido, C.; Boyle, C.D.

    1991-05-01

    This is document is a guide for conducting quality assurance inspections of transportations packaging suppliers, where suppliers are defined as designers, fabricators, distributors, users, or owners of transportation packaging. This document can be used during an inspection to determine regulatory compliance within the requirements of 10 Code of Federal Regulations, Part 71, Subpart H (10 CFR 71.101--71.135). The guidance described in this document provides a framework for an inspection. It provides the inspector with the flexibility to adapt the methods and concepts presented here to meet the needs of the particular facility being inspected. The guide was developed to ensure a structured and consistent approach for inspections. The method treats each activity at a supplier facility as a separate entity (or functional element), and combines the activities within the framework of an ''inspection tree.'' The method separates each functional element into several areas of performance and then identifies guidelines, based on regulatory requirements, to be used to qualitatively rate each area. This document was developed to serve as a field manual to facilitate the work of inspectors. 1 ref., 1 fig., 5 tabs

  16. Fuel inspection device

    International Nuclear Information System (INIS)

    Tsuji, Tadashi.

    1990-01-01

    The fuel inspection device of the present invention has a feature of obtaining an optimum illumination upon fuel rod interval inspection operation in a fuel pool. That is, an illumination main body used underwater is connected to a cable which is led out on a floor. A light control device is attached to the other end of the cable and an electric power cable is connected to the light control device. A light source (for example, incandescent lamp) is incorporated in the casing of the illumination main body, and a diffusion plate is disposed at the front to provide a plane light source. The light control device has a light control knob capable of remote-controlling the brightness of the light of the illumination main body. In the fuel inspection device thus constituted, halation is scarcely caused on the image screen upon inspection of fuels by a submerged type television camera to facilitate control upon inspection. Accordingly, efficiency of the fuel inspection can be improved to shorten the operation time. (I.S.)

  17. Design of an aid to visual inspection workstation

    Science.gov (United States)

    Tait, Robert; Harding, Kevin

    2016-05-01

    Visual Inspection is the most common means for inspecting manufactured parts for random defects such as pits, scratches, breaks, corrosion or general wear. The reason for the need for visual inspection is the very random nature of what might be a defect. Some defects may be very rare, being seen once or twice a year, but May still be critical to part performance. Because of this random and rare nature, even the most sophisticated image analysis programs have not been able to recognize all possible defects. Key to any future automation of inspection is obtaining good sample images of what might be a defect. However, most visual check take no images and consequently generate no digital data or historical record beyond a simple count. Any additional tool to captures such images must be able to do so without taking addition time. This paper outlines the design of a potential visual inspection station that would be compatible with current visual inspection methods, but afford the means for reliable digital imaging and in many cases augmented capabilities to assist the inspection. Considerations in this study included: resolution, depth of field, feature highlighting, and ease of digital capture, annotations and inspection augmentation for repeatable registration as well as operator assistance and training.

  18. A portable solution to enable guided ultrasonic inspection

    International Nuclear Information System (INIS)

    Enenkel, Laurent; Buechler, Johannes; Poirier, Jerome; Jervis David

    2012-01-01

    This paper describes the development and application of an innovative ultrasonic (UT) inspection system, which is 100% guided and menu-driven to reduce human error and ensure both inspection accuracy and productivity in the reliable and accurate non-destructive testing (NDT) of shafts, tubes, pipes, and other components and structures. Set-up is menu-directed with the minimum of instrument-specific training, allowing the integral operating software to calculate all the ultrasonic parameters for each task according to the inspection procedure and create an easy-to-follow inspection plan, using either phased array or conventional UT. The operator then scans the work piece, with an encoded scanner, which ensures that the inspection plan is strictly followed. Inspection data is transmitted to a review station in the industry-accepted, non-proprietary DICONDE protocol, allowing advanced analysis tools, such as real time, volume corrected imaging, to allow easier and more reliable image interpretation. By using GEs Rhythm software platform, inspection data can be reviewed and shared, reports generated and inspection results archived for traceability, tracking or further analysis.

  19. Incore inspection device

    International Nuclear Information System (INIS)

    Ogisu, Tatsuki; Taguchi, Kosei.

    1995-01-01

    The device of the present invention can inspect surfaces of equipments in reactor water in a nuclear reactor in a state of atmospheric air. Namely, an inspection device is movable forwardly and backwardly in a water-proof vessel. An annular sucker with pleats is disposed to the outer side of a lid of the water-proof vessel. A television camera for an under water monitoring is disposed to the inner side of the lid of the water-proof vessel by way of a partitioning wall with lid. Transferring screws are disposed at the back and on the side of the water-proof vessel. In the device having such a constitution, (1) the inside of the water-proof vessel is at first made water-tight by closing the partitioning wall with lid, (2) the back and the side screws are operated by the guide of the underwater monitoring television camera, to transfer the water-proof vessel to the surface of the reactor core to be inspected, (3) the annular sucker with pleats is urged on the surface to be inspected by the back screw, to fix the water-proof vessel, (4) reactor water in a space of the annular sucker with pleats is discharged and replaced with air, and (5) the lid of the partition wall with lid is opened and the inspection device is disposed at a position of the underwater monitoring television camera, to inspect the surface to be inspected in a state of atmospheric air. (I.S.)

  20. Inspection Strategies for Concrete Bridges

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard; Thoft-Christensen, Palle

    1989-01-01

    In this paper an optimal inspection strategy for concrete bridges based on periodic routine and detailed inspections is presented. The failure mode considered is corrosion of the reinforcement due to chlorides. A simple modelling of the corrosion and of the inspection strategy is presented....... The optimal inspection strategy is determined from an optimization problem, where the design variables are time intervals between detailed inspections and the concrete cover. The strategy is illustrated on a simple structure, namely a reinforced concrete beam....

  1. An overview of in-service inspection for nuclear power plants in Japan

    International Nuclear Information System (INIS)

    Takano, Eishiro

    1996-01-01

    In nuclear power stations, for maintaining the safety of machinery and equipment, it is stipulated to carry out periodic inspection. The contents of the periodic inspection and the inspections of important matters are explained. In-service inspection (ISI) is the nondestructive inspection for confirming the soundness of reactor pressure vessels, main pipings, valves and others. The stipulations on the scope and time of the periodic inspection and ISI, the course of introducing ISI into Japan, and the basic way of thinking on ISI are described. Pre-service inspection (PSI) is carried out for the purpose of collecting and recording the initial data for ISI. The range of the objects of nondestructive inspection and leak test and the range of the objects of leak test only are shown. As to nondestructive inspection, the parts to be inspected, the frequency of inspection and the methods of inspection, and the method of leak test are described. As the present state of inspection technology, the automatic ultrasonic flow detectors for reactor vessels, piping welded parts and reactor vessel stud bolts, and the eddy current flaw detector for steam generator tubes are explained. (K.I.)

  2. Pre and post garter spring repositioning ultrasonic inspection of pressure tubes

    International Nuclear Information System (INIS)

    Desimone, C.; Katchadjian, P.; Tacchia, Mauricio

    1997-01-01

    This paper present a description of the ultrasonic cracked hydride blister detections system used for pre and post inspection of pressure tubes during garter spring repositioning in CNE (Embalse Nuclear Power Station). Ultrasonic system setup configuration, transducers characteristics, blister detection head, calibration of parameters, operating procedure, records of ultrasonic inspections and evaluation. (author) [es

  3. Piping inspection round robin

    International Nuclear Information System (INIS)

    Heasler, P.G.; Doctor, S.R.

    1996-04-01

    The piping inspection round robin was conducted in 1981 at the Pacific Northwest National Laboratory (PNNL) to quantify the capability of ultrasonics for inservice inspection and to address some aspects of reliability for this type of nondestructive evaluation (NDE). The round robin measured the crack detection capabilities of seven field inspection teams who employed procedures that met or exceeded the 1977 edition through the 1978 addenda of the American Society of Mechanical Engineers (ASME) Section 11 Code requirements. Three different types of materials were employed in the study (cast stainless steel, clad ferritic, and wrought stainless steel), and two different types of flaws were implanted into the specimens (intergranular stress corrosion cracks (IGSCCs) and thermal fatigue cracks (TFCs)). When considering near-side inspection, far-side inspection, and false call rate, the overall performance was found to be best in clad ferritic, less effective in wrought stainless steel and the worst in cast stainless steel. Depth sizing performance showed little correlation with the true crack depths

  4. Inspection device in liquid

    International Nuclear Information System (INIS)

    Nagaoka, Etsuo.

    1996-01-01

    The present invention provides an inspection device in PWR reactor core in which inspection operations are made efficient by stabilizing a posture of the device in front-to-back, vertical and left-to-right directions by a simple structure. When the device conducts inspection while running in liquid, the front and the back directions of the device main body are inspected using a visual device while changing the posture by operating a front-to-back direction propulsion device and a right-to-left direction propulsion device, and a vertical direction propulsion device against to rolling, pitching and yawing of the device main body. In this case, a spherical magnet moves freely in the gravitational direction in a vibration-damping fluid in a non-magnetic spherical shell following the change of the posture of the device main body, in which the vibrations due to the movement of the spherical magnet is settled by the vibration-damping fluid thereby stabilizing the posture of the device main body. At a typical inspection posture, the settling effect is enhanced by the attraction force between the spherical magnets in the spherical shell and each of magnetic force-attracted magnetic members disposed to the outer circumference of the shell, and the posture of the device main body can be confirmed in front-to-back, right-to-left and vertical directions by each of the posture confirming magnetic sensors. (N.H.)

  5. IRSN-ANCCLI partnership. IRSN-ANCCLI seminar on decennial inspections of 900 MWe reactors - November 2010

    International Nuclear Information System (INIS)

    Rollinger, Francois; Delalonde, Jean-Claude; Hubert, F.; Paulmaz, X.; Tindillere, M.; Lheureux, Y.; Junker, R.; Sene, M.

    2010-11-01

    This seminar addressed the commitment of local information commissions (CLI) in the analysis and follow-up of the third decennial inspections of the French 900 MWe nuclear reactors. A first session addressed topics directly related to these inspections. Contributions proposed under the form of Power Point presentations by experts and representatives of the IRSN, EDF and CLIs addressed the following issues: safety re-examination of EDF 900 MWe reactors at the occasion of the third decennial inspection, activities of the IRSN related to skill management in nuclear power stations, implementation of the third decennial inspection of the unit 1 of the Fessenheim nuclear power station, the issue of follow-up by a local information commission after a decennial inspection. A second session addressed topics not related to decennial inspections and were proposed by Gravelines and Dampierre local information commissions: analysis of significant safety events, issues of skill management in nuclear power stations

  6. Plant abnormality inspection device

    International Nuclear Information System (INIS)

    Takenaka, Toshio.

    1990-01-01

    The present invention concerns a plant abnormality inspection device for conducting remote or automatic patrolling inspection in a plant and, more particularly, relates to such a device as capable of detecting abnormal odors. That is, the device comprises a moving device for moving to a predetermined position in the plant, a plurality of gas sensors for different kind of gases to be inspected mounted thereon, a comparator for comparing the concentration of a gas detected by the gas sensor with the normal gas concentration at the predetermined position and a judging means for judging the absence or presence of abnormality depending on the combination of the result of the comparison and deliverying a signal if the state is abnormal. As a result, a slight amount of gas responsible to odors released upon abnormality of the plant can be detected by a plurality of gas sensors for different kinds gases to rapidly and easily find abnormal portions in the plant. (I.S.)

  7. Magnetic particle inspection

    Science.gov (United States)

    Sastri, Sankar

    1990-01-01

    The purpose of this experiment is to familiarize the student with magnetic particle inspection and relate it to classification of various defects. Magnetic particle inspection is a method of detecting the presence of cracks, laps, tears, inclusions, and similar discontinuities in ferromagnetic materials such as iron and steel. This method will most clearly show defects that are perpendicular to the magnetic field. The Magnaglo method uses a liquid which is sprayed on the workpiece to be inspected, and the part is magnetized at the same time. The workpiece is then viewed under a black light, and the presence of discontinuity is shown by the formation of a bright indication formed by the magnetic particles over the discontinuity. The equipment and experimental procedures are described.

  8. Federal environmental inspections handbook

    International Nuclear Information System (INIS)

    1991-10-01

    This Federal Environmental Inspection Handbook has been prepared by the Department of Energy (DOE), Office of Environmental Guidance, RCRA/CERCLA Division (EH-231). It is designed to provide DOE personnel with an easily accessible compilation of the environmental inspection requirements under Federal environmental statutes which may impact DOE operations and activities. DOE personnel are reminded that this Handbook is intended to be used in concert with, and not as a substitute for, the Code of Federal Regulations (CFR). Federal Register (FR), and other applicable regulatory documents

  9. Subsea Infrastructure Inspection

    DEFF Research Database (Denmark)

    Mai, Christian; Pedersen, Simon; Hansen, Leif

    2016-01-01

    Due to the increasing energy demands, the offshore energy business has boomed in recent decades. Sub-sea pipeline and power transmission cable installations are commonly applied worldwide. Any potential breakages can cause equipment damage and also damage the environment. The majority...... (S-AUVs) can significantly change the inspections of infrastructure, as these vehicles could be much cheaper to deploy. S-AUVs can potentially conduct faster data collection and provide higher inspection data quality. However, there are still some technical challenges related to: underwater wireless...

  10. Inspection and test planning

    International Nuclear Information System (INIS)

    Miller, T.

    1980-01-01

    Purpose of Quality Plan - arrangement of all necessary tests or inspections as far as possible filted to certain components or systems. Subject of Quality Plan - precise determination of tests or inspections and - according to the actual safety significance - the certificates to be done. Disposition of Quality Plan - accommodation of tests to the actual state of fabrication. Application of Quality Plan - to any component or system that is regarded. Supervision of Employment - by authorized personnel of manufacturer, customer or authority providing exact employment of quality plan. Overservance of Instructions - certificates given by authorized personnel. (orig./RW)

  11. Inspection of Emergency Arrangements

    International Nuclear Information System (INIS)

    2013-01-01

    The Working Group on Inspection Practices (WGIP) was tasked by the NEA CNRA to examine and evaluate the extent to which emergency arrangements are inspected and to identify areas of importance for the development of good inspection practices. WGIP members shared their approaches to the inspection of emergency arrangements by the use of questionnaires, which were developed from the requirements set out in IAEA Safety Standards. Detailed responses to the questionnaires from WGIP member countries have been compiled and are presented in the appendix to this report. The following commendable practices have been drawn from the completed questionnaires and views provided by WGIP members: - RBs and their Inspectors have sufficient knowledge and information regarding operator's arrangements for the preparedness and response to nuclear emergencies, to enable authoritative advice to be given to the national coordinating authority, where necessary. - Inspectors check that the operator's response to a nuclear emergency is adequately integrated with relevant response organisations. - Inspectors pay attention to consider the integration of the operator's response to safety and security threats. - The efficiency of international relations is checked in depth during some exercises (e.g. early warning, assistance and technical information), especially for near-border facilities that could lead to an emergency response abroad. - RB inspection programmes consider the adequacy of arrangements for emergency preparedness and response to multi-unit accidents. - RBs assess the adequacy of arrangements to respond to accidents in other countries. - The RB's role is adequately documented and communicated to all agencies taking part in the response to a nuclear or radiological emergency. - Inspectors check that threat assessments for NPPs have been undertaken in accordance with national requirements and that up-to-date assessments have been used as the basis for developing emergency plans for

  12. Use of mountaineering rope climbing techniques vs custom-built platforms for penstock inspections

    Energy Technology Data Exchange (ETDEWEB)

    Bechai, M.; Dmochowski, A.; Conlon, J.; Bhat, P.D. [Ontario Hydro, Toronto, ON (Canada); Henderson, D. [Remote Access Technology Inc., Dartmouth, NS (Canada)

    1998-12-01

    Ontario Hydro has developed an inspection and maintenance strategy that requires periodic inspections of their ageing penstocks. The utility has 149 operating penstocks distributed throughout the province. Ontario Hydro experienced problems ranging from minor deterioration to major failures requiring immediate and costly shut-down of entire stations. Three levels of the inspection and maintenance strategy are described. These are a routine external inspections, periodic internal and external inspections, and detailed inspection and assessment. Detailed inspection requires full access to all areas of the penstock, inside and outside, with detailed testing and analysis. Rope access techniques have been used successfully and cost effectively to gain access for close up observation and tactile contact allowing for evaluation and testing. Minor, quick repairs can also be carried out. It was noted that specially designed platforms will still be needed when extensive repairs and maintenance is required. 2 refs., 1 tab., 3 figs.

  13. Pipework inspection apparatus

    International Nuclear Information System (INIS)

    Wrigglesworth, K.J.; Knowles, J.F.

    1987-01-01

    The patent concerns a pipework inspection apparatus, which is capable of negotiating bends in pipework. The apparatus comprises a TV camera system, which contains an optical section and an electronics section, which are connected by a flexible coupling. The system can be pulled or pushed along the bore of the pipework. (U.K.)

  14. Fuel assembly inspection device

    International Nuclear Information System (INIS)

    Yaginuma, Yoshitaka

    1998-01-01

    The present invention provides a device suitable to inspect appearance of fuel assemblies by photographing the appearance of fuel assemblies. Namely, the inspection device of the present invention measures bowing of fuel assembly or each of fuel rods or both of them based on the partially photographed images of fuel assembly. In this case, there is disposed a means which flashily projects images in the form of horizontal line from a direction intersecting obliquely relative to a horizontal cross section of the fuel assembly. A first image processing means separates the projected image pictures including projected images and calculates bowing. A second image processing means replaces the projected image pictures of the projected images based on projected images just before and after the photographing. Then, images for the measurement of bowing and images for inspection can be obtained simultaneously. As a result, the time required for the photographing can be shortened, the time for inspection can be shortened and an effect of preventing deterioration of photographing means by radiation rays can be provided. (I.S.)

  15. On the development of the METAR family of inspection tools

    Energy Technology Data Exchange (ETDEWEB)

    Lavoie, E. [Inst. de recherche d' Hydro-Quebec, Varennes, Quebec (Canada)]. E-mail: lavoie.eric@ireq.ca; Rousseau, G. [Hydro-Quebec, Central Nucleaire Gentilly-2, Gentilly, Quebec (Canada); Reynaud, L. [Inst. de recherche d' Hydro-Quebec, Varennes, Quebec (Canada)

    2003-07-01

    Since 1998, Hydro Quebec Research Centre (IREQ), in collaboration with Gentilly-2, has been working on the development of inspection devices for the feeder tubes of CANDU power plants. The first tool to come out of this work was the Metar bracelet, now used throughout the CANDU utilities, consisting of 14 ultrasonic probes held in place in a rigid bracelet to measure the thickness of the pipes and moved around manually along the pipe. Following the success of the Metar, a motorized version, i.e. the Crawler, has been developed to inspect beyond the operator arm's reach to access hard to reach place or further down the pipes in the reactor. This new system has been tested at 3 different stations and will be commercially available soon. Finally, the same technology was used to develop a motorized 2-axis crack detection device to answer new concerns about the feeder. Other configurations, depending on the demands from the industry, could also be developed for specific inspection needs, for example; inspection of the graylock welds, 360{sup o} inspection of feeders, or multitasking inspection on a single frame, etc. Most of the designs shown in this article have been or will be patented and are, or will be, licensed to a partner company to make them commercially available to the industry. This paper gives a brief history of the project and a description of the technologies developed in the last 5 years concerning feeder inspection. (author)

  16. CTBT on-site inspections

    Science.gov (United States)

    Zucca, J. J.

    2014-05-01

    On-site inspection (OSI) is a critical part of the verification regime for the Comprehensive Nuclear-Test-Ban Treaty (CTBT). The OSI verification regime provides for international inspectors to make a suite of measurements and observations on site at the location of an event of interest. The other critical component of the verification regime is the International Monitoring System (IMS), which is a globally distributed network of monitoring stations. The IMS along with technical monitoring data from CTBT member countries, as appropriate, will be used to trigger an OSI. After the decision is made to carry out an OSI, it is important for the inspectors to deploy to the field site rapidly to be able to detect short-lived phenomena such as the aftershocks that may be observable after an underground nuclear explosion. The inspectors will be on site from weeks to months and will be working with many tens of tons of equipment. Parts of the OSI regime will be tested in a field exercise in the country of Jordan late in 2014. The build-up of the OSI regime has been proceeding steadily since the CTBT was signed in 1996 and is on track to becoming a deterrent to someone considering conducting a nuclear explosion in violation of the Treaty.

  17. Implementing an effective self-assessment program at Millstone Station

    International Nuclear Information System (INIS)

    Venable, J.M.

    1996-01-01

    The nuclear industry is becoming ever more reliant on self-assessments to ensure operational safety and to meet our increasingly competitive business challenges. This trend includes utility assessments modeled after major U.S. Nuclear Regulatory Commission (NRC) inspections such as safety system functional inspections (SSFI). Utility conducted SSFIs leveraged the limited resources of the NRC, making possible many evaluations that simply would not have been conducted otherwise. This report describes a self-assessment program at the Millstone Station plant

  18. Remote tooling for inspection and repair in Pickering NGS-A calandria vault

    International Nuclear Information System (INIS)

    Hadji-Mirzai, M.; Tokarz, A.; Vandenberg, J.P.

    1993-01-01

    In recent years it has been necessary to develop capabilities for the inspection and repair of carbon steel components located within calandria vaults at Ontario Hydro's Pickering Nuclear Generating Station 'A'. Concerns about corrosion of piping and some of the structural components have made necessary the development of remote manipulators to inspect and repair carbon steel components within the vaults to ensure continued reliable operation of the units. Remote manipulators for this program have been designed to perform a number of inspection and repair tasks, and several versions have been developed to specialise in detailed inspection techniques and precision tooling module manipulation. (author)

  19. Advanced inspection technology for non intrusive inspection (NII) program

    International Nuclear Information System (INIS)

    Zamir Mohamed Daud

    2003-01-01

    In the current economic environment, plants and facilities are under pressure to introduced cost saving as well as profit maximising measures. Among the many changes in the way things are run is a move towards Risk Based Inspection (RBI), with an emphasis on longer operating periods between shutdowns as well as to utilise components to their maximum capability. Underpinning and RBI program requires good data from an effective online inspections program, which would not require the shutdown of critical components. One methodology of online inspection is known as Non Intrusive Inspection (NII), an inspection philosophy with the objective of replacing internal inspection of a vessel by doing Non Destructive Testing (NDT) and inspections externally. To this end, a variety of advanced NDT techniques are needed to provide accurate online measurements. (Author)

  20. Overview of the software inspection process

    Energy Technology Data Exchange (ETDEWEB)

    Lane, G.L.; Dabbs, R. [Sandia National Labs., Albuquerque, NM (United States)

    1997-11-01

    This tutorial introduces attendees to the Inspection Process and teaches them how to organize and participate in a software inspection. The tutorial advocates the benefits of inspections and encourages attendees to socialize the inspection process in their organizations.

  1. Waste Inspection Tomography (WIT)

    International Nuclear Information System (INIS)

    Bernardi, R.T.

    1995-01-01

    Waste Inspection Tomography (WIT) provides mobile semi-trailer mounted nondestructive examination (NDE) and assay (NDA) for nuclear waste drum characterization. WIT uses various computed tomography (CT) methods for both NDE and NDA of nuclear waste drums. Low level waste (LLW), transuranic (TRU), and mixed radioactive waste can be inspected and characterized without opening the drums. With externally transmitted x-ray NDE techniques, WIT has the ability to identify high density waste materials like heavy metals, define drum contents in two- and three-dimensional space, quantify free liquid volumes through density and x-ray attenuation coefficient discrimination, and measure drum wall thickness. With waste emitting gamma-ray NDA techniques, WIT can locate gamma emitting radioactive sources in two- and three-dimensional space, identify gamma emitting isotopic species, identify the external activity levels of emitting gamma-ray sources, correct for waste matrix attenuation, provide internal activity approximations, and provide the data needed for waste classification as LLW or TRU. The mobile feature of WIT allows inspection technologies to be brought to the nuclear waste drum storage site without the need to relocate drums for safe, rapid, and cost-effective characterization of regulated nuclear waste. The combination of these WIT characterization modalities provides the inspector with an unprecedented ability to non-invasively characterize the regulated contents of waste drums as large as 110 gallons, weighing up to 1,600 pounds. Any objects that fit within these size and weight restrictions can also be inspected on WIT, such as smaller waste bags and drums that are five and thirty-five gallons

  2. Recurrent inspection of tubes

    International Nuclear Information System (INIS)

    Andersson, S.

    1984-01-01

    Recommendations concerning the selection of areas for the inspection of tubes have been outlined. The aim is to focus the control on the regions which are important for the safety and where damage is supposed to take place. The number of zones will depend on the risk factors as judged by experts. The localizing will be based upon probable damaging mechanisms. A certain number of areas should be chosen at random. (G.B.)

  3. Regulatory inspection in Spain

    International Nuclear Information System (INIS)

    Alvarez de Buergo, L.

    1977-01-01

    The 1964 Act on Nuclear Energy lays down that the Junta de Energia Nuclear is responsible for assessing the hazards of and inspecting nuclear power plants as well as for the transport of nuclear fuel for these plants. The Junta de Energia Nuclear has a specialised service, the Nuclear Safety Department in charge of performing these duties. Experience acquired from work in this field is analysed in this paper. (NEA) [fr

  4. Infrared microscope inspection apparatus

    Science.gov (United States)

    Forman, Steven E.; Caunt, James W.

    1985-02-26

    Apparatus and system for inspecting infrared transparents, such as an array of photovoltaic modules containing silicon solar cells, includes an infrared microscope, at least three sources of infrared light placed around and having their axes intersect the center of the object field and means for sending the reflected light through the microscope. The apparatus is adapted to be mounted on an X-Y translator positioned adjacent the object surface.

  5. Wireless Roadside Inspection Proof of Concept Test Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Capps, Gary J [ORNL; Franzese, Oscar [ORNL; Knee, Helmut E [ORNL; Plate, Randall S [ORNL; Lascurain, Mary Beth [ORNL

    2009-03-01

    The U.S. Department of Transportation (DOT) FMCSA commissioned the Wireless Roadside Inspection (WRI) Program to validate technologies and methodologies that can improve safety through inspections using wireless technologies that convey real-time identification of commercial vehicles, drivers, and carriers, as well as information about the condition of the vehicles and their drivers. It is hypothesized that these inspections will: -- Increase safety -- Decrease the number of unsafe commercial vehicles on the road; -- Increase efficiency -- Speed up the inspection process, enabling more inspections to occur, at least on par with the number of weight inspections; -- Improve effectiveness -- Reduce the probability of drivers bypassing CMV inspection stations and increase the likelihood that fleets will attempt to meet the safety regulations; and -- Benefit industry -- Reduce fleet costs, provide good return-on-investment, minimize wait times, and level the playing field. The WRI Program is defined in three phases which are: Phase 1: Proof of Concept Test (POC) Testing of commercially available off-the-shelf (COTS) or near-COTS technology to validate the wireless inspection concept. Phase 2: Pilot Test Safety technology maturation and back office system integration Phase 3: Field Operational Test Multi-vehicle testing over a multi-state instrumented corridor This report focuses on Phase 1 efforts that were initiated in March, 2006. Technical efforts dealt with the ability of a Universal Wireless Inspection System (UWIS) to collect driver, vehicle, and carrier information; format a Safety Data Message Set from this information; and wirelessly transmit a Safety Data Message Set to a roadside receiver unit or mobile enforcement vehicle.

  6. OSE inspections: A different perspective

    International Nuclear Information System (INIS)

    Ware, J.H.

    1987-01-01

    The Office of Security Evaluation (OSE) is a staff activity of the Assistant Secretary for Defense Programs (ASDP) and is responsible for the conduct of an inspection and evaluation program. The OSE Inspection Division conducts assessments of the effectiveness of Department of Energy (DOE) Safeguards and Security policies and protection programs. The inspections are conducted by OSE Inspectors and Support Specialists. Prior to the author's participation in the inspection of the San Francisco Operations Office, a DOE Field Office employee had never played an active role in an OSE Inspection of another field office. This paper discloses his experience as an OSE Inspector

  7. Terahertz Radome Inspection

    Directory of Open Access Journals (Sweden)

    Fabian Friederich

    2018-01-01

    Full Text Available Radomes protecting sensitive radar, navigational, and communications equipment of, e.g., aircraft, are strongly exposed to the environment and have to withstand harsh weather conditions and potential impacts. Besides their significance to the structural integrity of the radomes, it is often crucial to optimize the composite structures for best possible radio performance. Hence, there exists a significant interest in non-destructive testing techniques, which can be used for defect inspection of radomes in field use as well as for quality inspection during the manufacturing process. Contactless millimeter-wave and terahertz imaging techniques provide millimeter resolution and have the potential to address both application scenarios. We report on our development of a three-dimensional (3D terahertz imaging system for radome inspection during industrial manufacturing processes. The system was designed for operation within a machining center for radome manufacturing. It simultaneously gathers terahertz depth information in adjacent frequency ranges, from 70 to 110 GHz and from 110 to 170 GHz by combining two frequency modulated continuous-wave terahertz sensing units into a single measurement device. Results from spiraliform image acquisition of a radome test sample demonstrate the successful integration of the measurement system.

  8. MACS as a tool for international inspections

    International Nuclear Information System (INIS)

    Curtiss, J.A.; Indusi, J.P.

    1995-01-01

    General acceptance of the challenge provision in the Chemical Weapons Convention has the potential for influence in other arms control areas. While most applications of the challenge inspection may be straightforward, there may be instances where access to the site by inspectors may be problematic. The MACS system described in this paper was developed to respond to these situations. Inspection and verification may be difficult when a host is unwilling,for valid reasons, to permit physical access to a site. We proposed a system of remote sensors which may be used to demonstrate compliance with Chemical Weapons Convention (CWC) challenge inspections even ff the inspector is physically excluded from a sensitive site. The system is based upon alternative-means-of-access provisions of the CWC. The Defense Nuclear Agency (DNA) funded design and construction of a system prototype, designated as MACS for Managed Access by Controlled Sensing. Features of the MACS design allow growth of the prototype into a versatile device for international monitoring of production facilities and other sites. MACS consists of instrumentation and communication equipment allowing site personnel to conduct a facility tour and perform acceptable measurements, while physically excluding the inspector from the facility. MACS consists of a base station used by the inspector, and a mobile unit used within the facility and manipulated by the facility staff. The base station and the mobile unit are at sign ed by a communication system, currently realized as a fiber optic cable. The mobile unit is equipped with television cameras and remote-reading distance-measuring equipment (DME) for use in verifying locations and dimensions. Global Positioning System receivers on the mobile unit provide both precise location and dead reckoning, suitable for tracking the mobile unit's position while within a building when satellite signals are not available

  9. Using a laser scanning camera for reactor inspection

    International Nuclear Information System (INIS)

    Armour, I.A.; Adrain, R.S.; Klewe, R.C.

    1984-01-01

    Inspection of nuclear reactors is normally carried out using TV or film cameras. There are, however, several areas where these cameras show considerable shortcomings. To overcome these difficulties, laser scanning cameras have been developed. This type of camera can be used for general visual inspection as well as the provision of high resolution video images with high ratio on and off-axis zoom capability. In this paper, we outline the construction and operation of a laser scanning camera and give examples of how it has been used in various power stations, and indicate future potential developments. (author)

  10. Pressurized water reactor inspection procedures

    International Nuclear Information System (INIS)

    Heinrich, D.; Mueller, G.; Otte, H.J.; Roth, W.

    1998-01-01

    Inspections of the reactor pressure vessels of pressurized water reactors (PWR) so far used to be carried out with different central mast manipulators. For technical reasons, parallel inspections of two manipulators alongside work on the refueling cavity, so as to reduce the time spent on the critical path in a revision outage, are not possible. Efforts made to minimize the inspection time required with one manipulator have been successful, but their effects are limited. Major reductions in inspection time can be achieved only if inspections are run with two manipulators in parallel. The decentralized manipulator built by GEC Alsthom Energie and so far emmployed in boiling water reactors in the USA, Spain, Switzerland and Japan allows two systems to be used in parallel, thus reducing the time required for standard inspection of a pressure vessel from some six days to three days. These savings of approximately three days are made possible without any compromises in terms of positioning by rail-bound systems. During inspection, the reactor refueling cavity is available for other revision work without any restrictions. The manipulator can be used equally well for inspecting standard PWR, PWR with a thermal shield, for inspecting the land between in-core instrumentation nozzles, BWR with and without jet pumps (complementary inspection), and for inspecting core support shrouds. (orig.) [de

  11. Guidelines for Learning Stations.

    Science.gov (United States)

    Fehrle, Carl C.; Schulz, Jolene

    Guidelines for designing and planning learning stations for pupils at the elementary grade level include suggestions on how to develop a station that will be successful in meeting the learners' needs. Instructions for the use of tapes at a station and matching pupils with stations are given, as are guidelines on classroom arrangement and record…

  12. Apparatus for inspecting a group of containers and method of using same

    Science.gov (United States)

    Lee, Jr., James H.; Salton, Jonathan R [Albuquerque, NM; Spletzer, Barry L [Albuquerque, NM

    2012-02-28

    An apparatus and method for inspecting a plurality of containers are provided. Each container has an outer surface for housing at least one material therein. The techniques provided involve at least one inspection vehicle and at least one detector. Each inspection vehicle has a plurality of wheels for movably positioning about the plurality of containers. The wheels may have at least one magnet for selectively adhering to the outer surface of at least one of the containers whereby the inspection vehicle traverses the container(s). The detector is positionable proximate at least one of the containers. The detector may be deployable from the inspection vehicle to a position adjacent the container(s). The detector has at least one sensor for measuring at least one characteristic of the plurality of containers. At least one base station may be provided for communicating with the inspection vehicle(s) and/or detector(s).

  13. SmartInspect: Smart Contract Inspection Technical Report

    OpenAIRE

    Bragagnolo , Santiago; Rocha , Henrique ,; Denker , Marcus; Ducasse , Stéphane

    2017-01-01

    Smart contracts are embedded procedures stored with the data they act upon. Debugging deployed Smart Contracts is a difficult task since once deployed, the code cannot be reexecuted and inspecting a simple attribute is not easily possible because data is encoded. In this technical report, we present SmartInspect to address the lack of inspectability of a deployed contract. Our solution analyses the contract state by using decompilation techniques and a mirror-based architecture to represent t...

  14. Shell Inspection History and Current CMM Inspection Efforts

    Energy Technology Data Exchange (ETDEWEB)

    Montano, Joshua Daniel [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-01-26

    The following report provides a review of past and current CMM Shell Inspection efforts. Calibration of the Sheffield rotary contour gauge has expired and the primary inspector, Matthew Naranjo, has retired. Efforts within the Inspection team are transitioning from maintaining and training new inspectors on Sheffield to off-the-shelf CMM technology. Although inspection of a shell has many requirements, the scope of the data presented in this report focuses on the inner contour, outer contour, radial wall thickness and mass comparisons.

  15. Safeguards management inspection procedures

    International Nuclear Information System (INIS)

    Barth, M.J.; Dunn, D.R.

    1984-08-01

    The objective of this inspection module is to independently assess the contributions of licensee management to overall safeguards systems performance. The inspector accomplishes this objective by comparing the licensee's safeguards management to both the 10 CFR, parts 70 and 73, requirements and to generally accepted management practices. The vehicle by which this comparison is to be made consists of assessment questions and key issues which point the inspector to areas of primary concern to the NRC and which raise additional issues for the purpose of exposing management ineffectiveness. Further insight into management effectiveness is obtained through those assessment questions specifically directed toward the licensee's safeguards system performance. If the quality of the safeguards is poor, then the inspector should strongly suspect that management's role is ineffective and should attempt to determine management's influence (or lack thereof) on the underlying safeguards deficiencies. (The converse is not necessarily true, however.) The assessment questions in essence provide an opportunity for the inspector to identify, to single out, and to probe further, questionable management practices. Specific issues, circumstances, and concerns which point to questionable or inappropriate practices should be explicitly identified and referenced against the CFR and the assessment questions. The inspection report should also explain why the inspector feels certain management practices are poor, counter to the CFR, and/or point to ineffecive management. Concurrent with documenting the inspection results, the inspector should provide recommendations for alleviating observed management practices that are detrimental to effective safeguards. The recommendations could include: specific changes in the practices of the licensee, followup procedures on the part of NRC, and proposed license changes

  16. Laser Safety Inspection Criteria

    International Nuclear Information System (INIS)

    Barat, K.

    2005-01-01

    A responsibility of the Laser Safety Officer (LSO) is to perform laser audits. The American National Standard Z136.1 Safe Use of Lasers references this requirement through several sections. One such reference is Section 1.3.2.8, Safety Features Audits, ''The LSO shall ensure that the safety features of the laser installation facilities and laser equipment are audited periodically to assure proper operation''. The composition, frequency and rigor of that inspection/audit rests in the hands of the LSO. A common practice for institutions is to develop laser audit checklists or survey forms It is common for audit findings from one inspector or inspection to the next to vary even when reviewing the same material. How often has one heard a comment, ''well this area has been inspected several times over the years and no one ever said this or that was a problem before''. A great number of audit items, and therefore findings, are subjective because they are based on the experience and interest of the auditor to particular items on the checklist. Beam block usage, to one set of eyes might be completely adequate, while to another, inadequate. In order to provide consistency, the Laser Safety Office of the National Ignition Facility Directorate has established criteria for a number of items found on the typical laser safety audit form. The criteria are distributed to laser users. It serves two broad purposes; first, it gives the user an expectation of what will be reviewed by an auditor. Second, it is an opportunity to explain audit items to the laser user and thus the reasons for some of these items, such as labelling of beam blocks

  17. Acoustic inspection device

    Energy Technology Data Exchange (ETDEWEB)

    Diaz, Aaron A.; Burghard, Brion J.; Skorpik, James R.; Pappas, Richard A.; Mullen, O. Dennis; Samuel, Todd J.; Reid, Larry D.; Harris, Joe C.; Valencia, Juan D.; Smalley, Jonathan T.; Shepard, Chester L.; Taylor, Theodore T.

    2005-09-06

    An ultrasound inspection apparatus particularly adapted to examine containers (sealed or unsealed) containing a liquid or solid bulk material. The apparatus has an overall configuration of a hand held pistol with a front transducer contact surface that is positioned against a front wall of the container. An ultrasound pulse is transmitted from the apparatus to be reflected from a back wall of a container being investigated. The received echo pulse is converted to a digital waveform. The waveform is analyzed relative to temperature, travel distance of the pulse(s), and time of travel to ascertain characteristics of the liquid or other materials and to provide identification of the same.

  18. Inspection of internal tank welds using the ACFM inspection method

    International Nuclear Information System (INIS)

    Topp, D.A.; Lugg, M.C.

    2009-01-01

    The paper describes recent developments of the ACFM technique and describes several case studies where ACFM has been used to inspect the internal plate welds on large steel storage tanks in refineries. For weld inspection, conventional methods such as magnetic particle inspection or vacuum box testing are generally used. This paper presents comparisons of the results from ACFM with those from the conventional methods, from which conclusions are drawn as to the benefits this technique offers in terms of cost, time savings and inspection reliability. (author)

  19. INSPECT: a package of computer programs for planning safeguards inspections

    International Nuclear Information System (INIS)

    Wincek, M.A.; Mullen, M.F.

    1979-04-01

    As part of the U.S. program to provide technical assistance to the International Atomic Energy Agency, a package of computer programs was developed for use in planning safeguards inspections of various types of nuclear facilities. The INSPECT software package is a set of five interactive FORTRAN programs which can be used to calculate the variance components of the MUF (Material Unaccounted For) statistic, the variance components of the D (difference) statistic, attribute and variables sampling plans, a measure of the effectiveness of the inspection, and a measurement of the cost of implementing the inspection plan. This report describes the programs and explains how to use them

  20. Endoscopic inspection of steam turbines

    International Nuclear Information System (INIS)

    Maliniemi, H.; Muukka, E.

    1990-01-01

    For over ten years, Imatran Voima Oy (IVO) has developed, complementary inspection methods for steam turbine condition monitoring, which can be applied both during operation and shutdown. One important method used periodically during outages is endoscopic inspection. The inspection is based on the method where the internal parts of the turbine is inspected through access borings with endoscope and where the magnified figures of the internal parts is seen on video screen. To improve inspection assurance, an image-processing based pattern recognition method for cracks has been developed for the endoscopic inspection of turbine blades. It is based on the deduction conditions derived from the crack shape. The computer gives an alarm of a crack detection and prints a simulated image of the crack, which is then checked manually

  1. 1100 MW BWR power station

    International Nuclear Information System (INIS)

    Anon.

    1983-01-01

    Now, the start-up test of No. 2 plant in Fukushima No. 2 Nuclear Power Station is smoothly in progress, and the start of its commercial operation is scheduled at the beginning of 1984. Here, the main features of No. 2 plant including piping design are explained. For No. 2 plant, many improving measures were adopted as the base plant of the improvement and standardization project of the Ministry of International Trade and Industry, such as the adoption of Mark-2 improved PCV, the adoption of an intermediate loop in the auxiliary cooling system, one-body forging of the lower end cover of the reactor pressure vessel, the adoption of many curved pipes, the adoption of large one-body structural components in reactor recirculation system piping and so on, which are related to the reduction of radiation exposure and the improvement of plant reliability in operation and regular inspection. Also, in order to do general adjustment in the arrangement of equipment and piping and in route design, and to establish the rational construction work plan, model engineering was adopted. In No. 2 plant, a remote-controlled automatic and semiautomatic ultrasonic flaw detection system was adopted to reduce radiation exposure in in-service inspection. Automatic welding was adopted to improve the quality. (Kako, I.)

  2. Darlington Station outage - a maintenance perspective

    International Nuclear Information System (INIS)

    Plourde, J.; Marczak, J.; Stone, M.; Myers, R.; Sutton, K.

    1997-01-01

    Ontario Hydro's Darlington Nuclear Generating Station (4x881MW(e)net) has carried out its first station outage since full commercial operation. The outage presented challenges to the organization in terms of outage planning, support, management, and safe execution within the constraints of schedule, budget and resources. This paper will focus on the success of the outage maintenance program, identifying the major work programs - a vacuum structure and containment outage, an emergency service water system outage, an emergency coolant injection system outage, intake channel inspections, low pressure service water inspections, and significant outage maintenance work on each of the four reactor units. Planning for the outage was initiated early in anticipation of this important milestone in the station's life. Detailed safety reviews - nuclear, radiation, and conventional - were conducted in support of the planned maintenance program. System lineup and work protection were provided by the Station Operator work group. Work protection permitry was initiated well in advance of the outage. Station maintenance staff resources were bolstered in support of the outage to ensure program execution could be maintained within the schedule. Training programs were in place to ensure that expectations were clear and that high standards would be maintained. Materials management issues in support of maintenance activities were given high priority to ensure no delays to the planned work. Station management review and monitoring in preparation for and during the outage ensured that staff priorities remained focused. Lessons learned from the outage execution are being formalized in maintenance procedures and outage management procedures, and shared with the nuclear community. (author)

  3. Waste inspection tomography (WIT)

    Energy Technology Data Exchange (ETDEWEB)

    Bernardi, R.T. [Bio-Imaging Research, Inc., Lincolnshire, IL (United States)

    1995-10-01

    Waste Inspection Tomography (WIT) provides mobile semi-trailer mounted nondestructive examination (NDE) and assay (NDA) for nuclear waste drum characterization. WIT uses various computed tomography (CT) methods for both NDE and NDA of nuclear waste drums. Low level waste (LLW), transuranic (TRU), and mixed radioactive waste can be inspected and characterized without opening the drums. With externally transmitted x-ray NDE techniques, WIT has the ability to identify high density waste materials like heavy metals, define drum contents in two- and three-dimensional space, quantify free liquid volumes through density and x-ray attenuation coefficient discrimination, and measure drum wall thickness. With waste emitting gamma-ray NDA techniques, WIT can locate gamma emitting radioactive sources in two- and three-dimensional space, identify gamma emitting, isotopic species, identify the external activity levels of emitting gamma-ray sources, correct for waste matrix attenuation, provide internal activity approximations, and provide the data needed for waste classification as LLW or TRU.

  4. Waste inspection tomography (WIT)

    International Nuclear Information System (INIS)

    Bernardi, R.T.

    1995-01-01

    Waste Inspection Tomography (WIT) provides mobile semi-trailer mounted nondestructive examination (NDE) and assay (NDA) for nuclear waste drum characterization. WIT uses various computed tomography (CT) methods for both NDE and NDA of nuclear waste drums. Low level waste (LLW), transuranic (TRU), and mixed radioactive waste can be inspected and characterized without opening the drums. With externally transmitted x-ray NDE techniques, WIT has the ability to identify high density waste materials like heavy metals, define drum contents in two- and three-dimensional space, quantify free liquid volumes through density and x-ray attenuation coefficient discrimination, and measure drum wall thickness. With waste emitting gamma-ray NDA techniques, WIT can locate gamma emitting radioactive sources in two- and three-dimensional space, identify gamma emitting, isotopic species, identify the external activity levels of emitting gamma-ray sources, correct for waste matrix attenuation, provide internal activity approximations, and provide the data needed for waste classification as LLW or TRU

  5. Inspections - a cost effective approach

    International Nuclear Information System (INIS)

    Joseph, C.

    1981-01-01

    This paper describes a cost effective approach for inspections of Computerized Nuclear Materials Control and Accounting Systems (CNMCAS). Highlighted is the capability to conduct an inspection program via portable telephone terminals from off-site locations. The program can be applied to various materials management functions including materials control, quality assurance, and materials accounting. The system is designed to facilitate inspections by both external and internal groups

  6. Improvements in televisual and photographic inspections of AGRs

    International Nuclear Information System (INIS)

    Hayter, R.; Wadsworth, A.

    1988-01-01

    The visual inspection techniques and equipment used at AGR Power Stations have been improved and updated in the light of need and technological advance, new equipment being developed and introduced where necessary. Specifically this report covers the development and use of: a short TRIUMPH compatible photographic camera 600 mm long x 75 mm dia taking 50 shots on a 35 mm film; a 240 mm dia photographic pod taking high quality 70 mm format photographs of large in-reactor volumes; a photographic camera of cross section 37 x 17 mm for the inspection of helically wound AGR boilers and the subsequent development of this latter device into a state of the art TV inspection camera. (author)

  7. In-service inspection of nuclear power-plant pressure components

    International Nuclear Information System (INIS)

    Lautzenheiser, C.E.

    1976-01-01

    The early light-water-reactor systems for production of commercial power were designed and fabricated in accordance with the codes then being used for fossil-fired power-generating stations with some design changes for increased inspectability during fabrication. Over the past few years, major strides have been made in in-service inspection technology. Work has been under way to determine the reliability of nondestructive testing methods and to develop formal inspection programs throughout the world. The major problems associated with in-service inspection are the scarcity of qualified personnel, the variability in procedures and data recording between inspection agencies, and exposure of inspection personnel to radiation. Further work will be required to more completely mechanize piping inspections to reduce radiation exposure and to standardize inspection procedures, equipment, and certification of personnel. Worldwide attention to the requirements of the American Society of Mechanical Engineers' Boiler and Pressure Vessel Code, the size and integrity of inspection agencies, and efforts such as the development of personnel qualification and certification guides emphasize the importance of in-service inspection to nuclear safety

  8. Inspection system performance test procedure

    International Nuclear Information System (INIS)

    Jensen, C.E.

    1995-01-01

    This procedure establishes requirements to administer a performance demonstration test. The test is to demonstrate that the double-shell tank inspection system (DSTIS) supplied by the contractor performs in accordance with the WHC-S-4108, Double-Shell Tank Ultrasonic Inspection Performance Specification, Rev. 2-A, January, 1995. The inspection system is intended to provide ultrasonic (UT) and visual data to determine integrity of the Westinghouse Hanford Company (WHC) site underground waste tanks. The robotic inspection system consists of the following major sub-systems (modules) and components: Mobile control center; Deployment module; Cable management assembly; Robot mechanism; Ultrasonic testing system; Visual testing system; Pneumatic system; Electrical system; and Control system

  9. Experience on inspection at PFPF

    International Nuclear Information System (INIS)

    Aoki, I.; Yamamoto, Y.; Takahashi, Saburo; Ooshima, Hirofumi; Kuniyasu, Kazufusa.

    1993-01-01

    In order to reduce a personal radiation exposure, Plutonium Fuel Production Facility (PFPF) introduced an automated MOX fabrication technology. Safeguards system for the PFPF was designed and installed so as to be compatible with automated process operation as much as possible. Introduction of these system in PFPF made possible to do the inspection measurements with unattended mode and Near Real Time Material Accountancy (NRTA), consequently inspection has been carrying out effectively and efficiently. This paper describes the new Inspection activities as a comparison with old Inspection activities based on our experience. (author)

  10. PWR vessel inspection performance improvements

    International Nuclear Information System (INIS)

    Blair Fairbrother, D.; Bodson, Francis

    1998-01-01

    A compact robot for ultrasonic inspection of reactor vessels has been developed that reduces setup logistics and schedule time for mandatory code inspections. Rather than installing a large structure to access the entire weld inspection area from its flange attachment, the compact robot examines welds in overlapping patches from a suction cup anchor to the shell wall. The compact robot size allows two robots to be operated in the vessel simultaneously. This significantly reduces the time required to complete the inspection. Experience to date indicates that time for vessel examinations can be reduced to fewer than four days. (author)

  11. Comparison of secondary system piping Cr content with inspection data

    International Nuclear Information System (INIS)

    Tapping, R.L.; Mitchell, A.M.

    1997-06-01

    For several years a number of Ontario Hydro and CANDU-6 stations have been sampling sections of secondary-side piping for chromium content. Several hundred of these measurements have been made, and comparisons with inspection data drawn. There is special interest in chromium concentrations in the range 0.01< Cr<0.1 wt.%, in order to better define the effect of trace chromium content on susceptibility to flow-assisted corrosion. (author)

  12. Plant inspection tours with mobile data logging system

    International Nuclear Information System (INIS)

    Roesser, U.

    2006-01-01

    The MDE Mobile Data Logging System has been introduced in a number of German power plants for efficient logging, evaluation, and quality-assured documentation of data recorded on plant inspection tours by means of pocket PCs instead of slips of paper. It will be installed in other nuclear power plants in the near future. The MDE system is composed of the pocket PCs for logging data during plant inspection tours, the associated docking stations installed in the respective areas of application, one PC or, if necessary, several PCs with the appropriate user software, and the associated network links. To install the software in the power plant, lists of rooms and measurement stations as well as other positions on an inspection course are transmitted to the MDE system. When the system has been commissioned, inspection tours are planned in accordance with past experience and optimized in the computer. User experience is taken into account in program updates. New functions improve user comfort and ease of evaluation. Additions to the MDE software, and applications in other areas, are tentatively planned and will be implemented as the need arises. (orig.)

  13. Laser Safety Inspection Criteria

    International Nuclear Information System (INIS)

    Barat, K

    2005-01-01

    A responsibility of the Laser Safety Officer (LSO) is to perform laser safety audits. The American National Standard Z136.1 Safe use of Lasers references this requirement in several sections: (1) Section 1.3.2 LSO Specific Responsibilities states under Hazard Evaluation, ''The LSO shall be responsible for hazards evaluation of laser work areas''; (2) Section 1.3.2.8, Safety Features Audits, ''The LSO shall ensure that the safety features of the laser installation facilities and laser equipment are audited periodically to assure proper operation''; and (3) Appendix D, under Survey and Inspections, it states, ''the LSO will survey by inspection, as considered necessary, all areas where laser equipment is used''. Therefore, for facilities using Class 3B and or Class 4 lasers, audits for laser safety compliance are expected to be conducted. The composition, frequency and rigueur of that inspection/audit rests in the hands of the LSO. A common practice for institutions is to develop laser audit checklists or survey forms. In many institutions, a sole Laser Safety Officer (LSO) or a number of Deputy LSO's perform these audits. For that matter, there are institutions that request users to perform a self-assessment audit. Many items on the common audit list and the associated findings are subjective because they are based on the experience and interest of the LSO or auditor in particular items on the checklist. Beam block usage is an example; to one set of eyes a particular arrangement might be completely adequate, while to another the installation may be inadequate. In order to provide more consistency, the National Ignition Facility Directorate at Lawrence Livermore National Laboratory (NIF-LLNL) has established criteria for a number of items found on the typical laser safety audit form. These criteria are distributed to laser users, and they serve two broad purposes: first, it gives the user an expectation of what will be reviewed by an auditor, and second, it is an

  14. Care management at Ikata Power Station

    International Nuclear Information System (INIS)

    Sakai, Koji

    1982-01-01

    For operating nuclear power stations safely and economically, it is necessary to control nuclear fuel itself and reactor cores. Nuclear fuel must be controlled consistently in view of quantitative balance and operational method over the whole nuclear fuel cycle of uranium ore, fabrication, burning in reactors and reprocessing, based on the plan of using fuel in electric power companies. The control of the burning in reactors is called core management, and it is important because the users of fuel execute it. For dealing with such core management works, Shikoku Electric Power Co., Inc., has developed the computer code system for grasping the state of fuel exchange and the burning condition in reactors and used it since 1972. The outline of the core management in Ikata Power Station is reported in this paper centering around computing works. The core management works are divided into those at the time of regular inspection and those in operation. In the regular inspection, fuel inspection, fuel exchange and reactor physics test are performed. In operation, the burning condition of fuel is grasped. The technical computations corresponding to these works are explained, and the examples of computations are shown. (Kako, I.)

  15. Short notice inspections

    International Nuclear Information System (INIS)

    Pouchkarev, V.

    1998-01-01

    For 30 years the IAEA safeguards system have evolved and have been strengthened by the regular introduction of new methods and techniques, improving both its effectiveness and efficiency. The member States of the IAEA have indicated their willingness to accept new obligations and associated technical measure that greatly strengthen the nuclear safeguards system. One element of this is the extent to which the IAEA inspectors have physical access to relevant locations for the purpose of providing independent verification of the exclusively peaceful intent of a State nuclear program. The Protocol to Safeguards granted new legal authority with respect to information on, and short notice inspector access to, all buildings on a nuclear site and administrative agreements that improve the process of designating inspectors and IAEA access to modern means of communication. This report is a short description of unannounced or short notice inspections as measures on which the new strengthened and cost efficient system will be based

  16. Reference Climatological Stations

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Reference Climatological Stations (RCS) network represents the first effort by NOAA to create and maintain a nationwide network of stations located only in areas...

  17. Streamflow Gaging Stations

    Data.gov (United States)

    Department of Homeland Security — This map layer shows selected streamflow gaging stations of the United States, Puerto Rico, and the U.S. Virgin Islands, in 2013. Gaging stations, or gages, measure...

  18. Fire Stations - 2007

    Data.gov (United States)

    Kansas Data Access and Support Center — Fire Station Locations in Kansas Any location where fire fighters are stationed at or based out of, or where equipment that such personnel use in carrying out their...

  19. Hammond Bay Biological Station

    Data.gov (United States)

    Federal Laboratory Consortium — Hammond Bay Biological Station (HBBS), located near Millersburg, Michigan, is a field station of the USGS Great Lakes Science Center (GLSC). HBBS was established by...

  20. Water Level Station History

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Images contain station history information for 175 stations in the National Water Level Observation Network (NWLON). The NWLON is a network of long-term,...

  1. Weather Radar Stations

    Data.gov (United States)

    Department of Homeland Security — These data represent Next-Generation Radar (NEXRAD) and Terminal Doppler Weather Radar (TDWR) weather radar stations within the US. The NEXRAD radar stations are...

  2. Big Game Reporting Stations

    Data.gov (United States)

    Vermont Center for Geographic Information — Point locations of big game reporting stations. Big game reporting stations are places where hunters can legally report harvested deer, bear, or turkey. These are...

  3. Ocean Station Vessel

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Ocean Station Vessels (OSV) or Weather Ships captured atmospheric conditions while being stationed continuously in a single location. While While most of the...

  4. Fire Stations - 2009

    Data.gov (United States)

    Kansas Data Access and Support Center — Fire Stations in Kansas Any location where fire fighters are stationed or based out of, or where equipment that such personnel use in carrying out their jobs is...

  5. Newport Research Station

    Data.gov (United States)

    Federal Laboratory Consortium — The Newport Research Station is the Center's only ocean-port research facility. This station is located at Oregon State University's Hatfield Marine Science Center,...

  6. Inspection of disposal canisters components

    International Nuclear Information System (INIS)

    Pitkaenen, J.

    2013-12-01

    This report presents the inspection techniques of disposal canister components. Manufacturing methods and a description of the defects related to different manufacturing methods are described briefly. The defect types form a basis for the design of non-destructive testing because the defect types, which occur in the inspected components, affect to choice of inspection methods. The canister components are to nodular cast iron insert, steel lid, lid screw, metal gasket, copper tube with integrated or separate bottom, and copper lid. The inspection of copper material is challenging due to the anisotropic properties of the material and local changes in the grain size of the copper material. The cast iron insert has some acoustical material property variation (attenuation, velocity changes, scattering properties), which make the ultrasonic inspection demanding from calibration point of view. Mainly three different methods are used for inspection. Ultrasonic testing technique is used for inspection of volume, eddy current technique, for copper components only, and visual testing technique are used for inspection of the surface and near surface area

  7. MTR fuel inspection at CERCA

    International Nuclear Information System (INIS)

    Fanjas, Y.

    1992-01-01

    The stringent specifications for MTR fuel plates and fuel elements require various sophisticated inspection techniques. In particular, the development of low enriched silicide fuels made it necessary to adapt these techniques to high density plates. This paper presents the status of inspection technology at CERCA. (author)

  8. 1990 waste tank inspection program

    International Nuclear Information System (INIS)

    McNatt, F.G.

    1990-01-01

    Aqueous radioactive wastes from Savannah River Site separations processes are contained in large underground carbon steel tanks. Tank conditions are evaluated by inspection using periscopes, still photography, and video systems for visual imagery. Inspections made in 1990 are the subject of this report

  9. Computerized automated remote inspection system

    International Nuclear Information System (INIS)

    The automated inspection system utilizes a computer to control the location of the ultrasonic transducer, the actual inspection process, the display of the data, and the storage of the data on IBM magnetic tape. This automated inspection equipment provides two major advantages. First, it provides a cost savings, because of the reduced inspection time, made possible by the automation of the data acquisition, processing, and storage equipment. This reduced inspection time is also made possible by a computerized data evaluation aid which speeds data interpretation. In addition, the computer control of the transducer location drive allows the exact duplication of a previously located position or flaw. The second major advantage is that the use of automated inspection equipment also allows a higher-quality inspection, because of the automated data acquisition, processing, and storage. This storage of data, in accurate digital form on IBM magnetic tape, for example, facilitates retrieval for comparison with previous inspection data. The equipment provides a multiplicity of scan data which will provide statistical information on any questionable volume or flaw. An automatic alarm for location of all reportable flaws reduces the probability of operator error. This system has the ability to present data on a cathode ray tube as numerical information, a three-dimensional picture, or ''hard-copy'' sheet. One important advantage of this system is the ability to store large amounts of data in compact magnetic tape reels

  10. Technology Assessment of the Inspection Readiness Plan in Chemical Weapons Convention Challenge Inspections

    National Research Council Canada - National Science Library

    Woodley, Anthony

    1998-01-01

    ...) Challenge Inspections. The CWC is an intrusive inspection. The Challenge Inspection allows for a team of international inspectors to inspect on very short notice a naval facility suspected of violating the CWC...

  11. Process Improvement to the Inspection Readiness Plan in Chemical Weapons Convention Challenge Inspections

    National Research Council Canada - National Science Library

    Triplett, William

    1997-01-01

    ...) Challenge Inspection. The CWC is an intensive inspection. The Challenge Inspection allows for a team of international inspectors to inspect a naval facility suspected of violating the CWC on very short notice...

  12. Remote inspection through a virtual world

    Energy Technology Data Exchange (ETDEWEB)

    Lee, D.J.

    1996-05-01

    Virtual Reality (VR) is an expression that is most often associated with the entertainment industry. At Torness Power Station however, VR technology has been successfully applied to recovery operations with significant time and cost benefits. This paper describes the nature of the VR applications at Torness and its proposed development for remote reactor inspection. The present programme has provided several challenges to the VR system capabilities which are described together with details of how these are being overcome. Efficient computer model development and user-friendly operator interfaces are established as essential ingredients. These factors are being achieved in a progressive manner and there is confidence that significant operational improvements will be achieved through the application of this rapidly developing technology. (author).

  13. Remote inspection through a virtual world

    International Nuclear Information System (INIS)

    Lee, D.J.

    1996-01-01

    Virtual Reality (VR) is an expression that is most often associated with the entertainment industry. At Torness Power Station however, VR technology has been successfully applied to recovery operations with significant time and cost benefits. This paper describes the nature of the VR applications at Torness and its proposed development for remote reactor inspection. The present programme has provided several challenges to the VR system capabilities which are described together with details of how these are being overcome. Efficient computer model development and user-friendly operator interfaces are established as essential ingredients. These factors are being achieved in a progressive manner and there is confidence that significant operational improvements will be achieved through the application of this rapidly developing technology. (author)

  14. Dose reduction for snubber inspection and testing

    International Nuclear Information System (INIS)

    Morrison, G.M.; Cotton, S.R.

    1991-01-01

    This paper reports that Health physics staff members at Grand Gulf Nuclear Station have implemented several dose reduction methods for snubber inspection, testing and changeout. These methods include construction maps to permit easy location of snubbers in the drywell, painting azimuth numbers on the inside drywell wall and biological shield wall to coincide with the maps, requiring pre-job briefings for quality inspectors and craft support personnel, using job history files for work planning, using experienced inspectors and craft personnel whenever possible, designating certain craft personnel solely for snubber work, and cutting out stuck snubber pins rather than attempting intact removal. The total dose for snubber-related tasks has been significantly reduced using these methods

  15. International cooperation in production inspections

    International Nuclear Information System (INIS)

    Limousin, S.

    2009-01-01

    Nuclear pressure equipment, like the reactor pressure vessel or steam generators, are manufactured in many countries all around the world. As only few reactors were built in the 90's, most of the nuclear safety authorities have lost part of their know how in component manufacturing oversight. For these two reasons, vendor inspection is a key area for international cooperation. On the one hand, ASN has bilateral relationships with several countries (USA, Finland, China...) to fulfill specific purposes. On the other hand, ASN participates in international groups like the MDEP ( Multinational Design Evaluation Program). A MDEP working group dedicated to vendor inspection cooperation enables exchanges of informations (inspection program plan, inspection findings...) among the regulators. Join inspections are organized. International cooperation could lead in the long term to an harmonization of regulatory practices. (author)

  16. Full-scale testing of waste package inspection system

    International Nuclear Information System (INIS)

    Yagi, T.; Kuribayashi, H.; Moriya, Y.; Fujisawa, H.; Takebayashi, N.

    1989-01-01

    In land disposal of low-level radioactive waste (LLW) in Japan, it is legally required that the waste packages to be disposed of be inspected for conformance to applicable technical regulations prior to shipment from each existing power station. JGC has constructed a fully automatic waste package inspection system for the purpose of obtaining the required design data and proving the performance of the system. This system consists of three inspection units (for visual inspection, surface contamination/dose rate measurement and radioactivity/weight measurement), a labelling unit, a centralized control unit and a drum handling unit. The outstanding features of the system are as follows: The equipment and components are modularized and designed to be of the most compact size and the quality control functions are performed by an advanced centralized control system. The authors discuss how, as a result of the full-scale testing, it has been confirmed that this system satisfies all the performance requirements for the inspection of disposal packages

  17. A review of digital radiography technology for valve inspection

    International Nuclear Information System (INIS)

    Stoev, K.; Guerout, F.M.; Horn, D.

    2008-01-01

    There are thousands of valves in a nuclear power plant (NPP) used for control, safety and checks in various plant systems, so there is a well-identified need for fast and reliable inspection and diagnostics of valves. Digital radiography can provide considerable improvements to the inspection and testing procedures for valves in comparison to classical film radiography. These improvements can lead to significant financial advantages by providing real-time inspection results, significantly reduced inspection and decision-making time, and reduced operational cost. Digital image processing, including digital image enhancement, digital archiving, and digital communication of the images and the results, is also a considerable advantage over classical film radiography technology. Another advantage of digital radiography technology is the improved safety and the reduced environmental impact due to reduced exposure/test times, use of smaller exclusion zones, elimination of chemical processing, and absence of disposable materials. This paper reviews the existing technology and evaluates the potential of digital radiography for inspection and diagnostics of valves. Station needs and requirements are assessed, and the safety, environmental and economical constraints of digital radiography techniques estimated. The advantages and disadvantages of different digital radiography equipment are compared, and their limitations and characteristics studied. (author)

  18. 7 CFR 29.75c - Display of tobacco at receiving stations.

    Science.gov (United States)

    2010-01-01

    ... receiving stations. Each lot of tobacco delivered for sale at receiving stations and transferred to a conveyor system for unloading shall maintain a distance between adjacent lots of not less than 18 inches during the inspection process. The platform area used for examination with a conveyor system shall be a...

  19. Detailed simulation of ultrasonic inspections

    International Nuclear Information System (INIS)

    Chaplin, K.R.; Douglas, S.R.; Dunford, D.

    1997-01-01

    Simulation of ultrasonic inspection of engineering components have been performed at the Chalk River Laboratories of AECL for over 10 years. The computer model, called EWE for Elastic Wave Equations, solves the Elastic Wave Equations using a novel finite difference scheme. It simulates the propagation of an ultrasonic wave from the transducer to a flaw, the scatter of waves from the flaw, and measurement of signals at a receive transducer. Regions of different materials, water and steel for example, can be simulated. In addition, regions with slightly different material properties from the parent material can be investigated. The two major types of output are displays of the ultrasonic waves inside the component and the corresponding A-scans. EPRI and other organizations have used ultrasonic models for: defining acceptable ultrasonic inspection procedures, designing and evaluating inspection techniques, and for quantifying inspection reliability. The EWE model has been applied to the inspection of large pipes in a nuclear plant, gas pipeline welds and steam generator tubes. Most recent work has dealt with the ultrasonic inspection of pressure tubes in CANDU reactors. Pressure tube inspections can reliably detect and size defects; however, there are improvements that can be made. For example, knowing the sharpness of a flaw-tip is crucial for fitness for service assessments. Computer modelling of the ultrasonic inspection of flaws with different root radius has suggested inspection techniques that provide flaw tip radius information. A preliminary investigation of these methods has been made in the laboratory. The basis for the model will be reviewed at the presentation. Then the results of computer simulations will be displayed on a PC using an interactive program that analyzes simulated A-scans. This software tool gives inspection staff direct access to the results of computer simulations. (author)

  20. Underwater inspection training in intense radiation field

    International Nuclear Information System (INIS)

    Taniguchi, Ryoichi

    2017-01-01

    Osaka Prefecture University has a large dose cobalt 60 gamma ray source of about 2 PBq, and is engaged in technological training and human resource development. It is assumed that the decommissioning underwater operation of Fukushima Daiichi Nuclear Power Station would be the focus. The university aims at acquisition of the basic of underwater inspection work under radiation environment that is useful for the above purpose, radiation measurement under water, basic training in image measurement, and aims as well to evaluate the damage of imaging equipment due to radiation, and master practical knowledge for the use of inspection equipment under a large dose. In particular, it is valuable to train in the observation of Cherenkov light emitted from a large dose cobalt radiation source in water using a high sensitivity camera. The measurement of radiation dose distribution in water had difficulty in remote measurement due to water shielding effect. Although it took much time before, the method using high sensitivity camera is easy to sequentially perform two-dimensional measurement, and its utility value is large. Its effect on the dose distribution measurement of irregularly shaped sources is great. The contents of training includes the following: radiation source imaging in water, use of a laser rangefinder in water, dose distribution measurement in water and Cherenkov light measurement, judgment of equipment damage due to irradiation, weak radiation measurement, and measurement and decontamination of surface contamination. (A.O.)

  1. CDIP Station Data Collection - All Stations

    Data.gov (United States)

    Scripps Institution of Oceanography, UC San Diego — The Coastal Data Information Program's station data collection consists of all publicly-released coastal environment measurements taken over the program's history, a...

  2. Overview of steam generator tube-inspection technology

    International Nuclear Information System (INIS)

    Obrutsky, L.; Renaud, J.; Lakhan, R.

    2014-01-01

    Degradation of steam generator (SG) tubing due to both mechanical and corrosion modes has resulted in extensive repairs and replacement of SGs around the world. The variety of degradation modes challenges the integrity of SG tubing and, therefore, the stations' reliability. Inspection and monitoring aimed at timely detection and characterization of the degradation is a key element for ensuring tube integrity. Up to the early-70's, the in-service inspection of SG tubing was carried out using single-frequency eddy current testing (ET) bobbin coils, which were adequate for the detection of volumetric degradation. By the mid-80's, additional modes of degradation such as pitting, intergranular attack, and axial and circumferential inside or outside diameter stress corrosion cracking had to be addressed. The need for timely, fast detection and characterization of these diverse modes of degradation motivated the development in the 90's of inspection systems based on advanced probe technology coupled with versatile instruments operated by fast computers and remote communication systems. SG inspection systems have progressed in the new millennium to a much higher level of automation, efficiency and reliability. Also, the role of Non Destructive Evaluation (NDE) has evolved from simple detection tools to diagnostic tools that provide input into integrity assessment decisions, fitness-far-service and operational assessments. This new role was motivated by tighter regulatory requirements to assure the safety of the public and the environment, better SG life management strategies and often self-imposed regulations. It led to the development of advanced probe technologies, more reliable and versatile instruments and robotics, better training and qualification of personnel and better data management and analysis systems. This paper provides a brief historical perspective regarding the evolution of SG inspections and analyzes the motivations behind that evolution. It presents an

  3. Overview of steam generator tube-inspection technology

    Energy Technology Data Exchange (ETDEWEB)

    Obrutsky, L.; Renaud, J.; Lakhan, R., E-mail: obrutskl@aecl.ca, E-mail: renaudj@aecl.ca, E-mail: lakhanr@aecl.ca [Atomic Energy of Canada Limited, Chalk River, Ontario (Canada)

    2014-03-15

    Degradation of steam generator (SG) tubing due to both mechanical and corrosion modes has resulted in extensive repairs and replacement of SGs around the world. The variety of degradation modes challenges the integrity of SG tubing and, therefore, the stations' reliability. Inspection and monitoring aimed at timely detection and characterization of the degradation is a key element for ensuring tube integrity. Up to the early-70's, the in-service inspection of SG tubing was carried out using single-frequency eddy current testing (ET) bobbin coils, which were adequate for the detection of volumetric degradation. By the mid-80's, additional modes of degradation such as pitting, intergranular attack, and axial and circumferential inside or outside diameter stress corrosion cracking had to be addressed. The need for timely, fast detection and characterization of these diverse modes of degradation motivated the development in the 90's of inspection systems based on advanced probe technology coupled with versatile instruments operated by fast computers and remote communication systems. SG inspection systems have progressed in the new millennium to a much higher level of automation, efficiency and reliability. Also, the role of Non Destructive Evaluation (NDE) has evolved from simple detection tools to diagnostic tools that provide input into integrity assessment decisions, fitness-far-service and operational assessments. This new role was motivated by tighter regulatory requirements to assure the safety of the public and the environment, better SG life management strategies and often self-imposed regulations. It led to the development of advanced probe technologies, more reliable and versatile instruments and robotics, better training and qualification of personnel and better data management and analysis systems. This paper provides a brief historical perspective regarding the evolution of SG inspections and analyzes the motivations behind that

  4. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1991-02-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organizations during the period from October 1990 through December 1990

  5. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1993-05-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organizations during the period from January 1993 through March 1993

  6. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1991-05-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organization during the period from January 1991 through March 1991

  7. Licensee contractor and Vendor Inspection status report

    International Nuclear Information System (INIS)

    1993-01-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organizations during the period from October 1992 through December 1992

  8. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1989-12-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organizations during the period from July 1989 through September 1989

  9. Lean Construction Applications for Bridge Inspection

    Science.gov (United States)

    2017-10-01

    Lean philosophy was used to analyze the efficiency of bridge inspection. Emphasis was put on identifying activities that add value to the final output, an owner approved bridge inspection report. 26 bridge inspections were shadowed. Time spent on bri...

  10. Licensee Contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1992-01-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organization during the period from October through December 1991

  11. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1993-08-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organizations during the period from April through June 1993

  12. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1991-09-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organization during the period from April 1991 through June 1991

  13. Automated visual inspection of moving custom parts

    CSIR Research Space (South Africa)

    Davrajh, S

    2008-01-01

    Full Text Available frequencies than batched produced parts. This higher frequency of inspection significantly impacts inspection times, and inherently, production rates. An effective, diverse, accurate, robust, and time efficient method for inspecting custom parts is therefore...

  14. Licensee contractor and Vendor Inspection status report

    International Nuclear Information System (INIS)

    1992-05-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organizations during the period from January through March 1992

  15. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1990-07-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organization during the period from January 1990 through March 1990

  16. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1990-01-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organizations during the period from October 1989 through December 1989

  17. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1992-11-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organization during the period from July 1992 through September 1992

  18. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1991-10-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organization during the period from July 1991 through September 1991

  19. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1990-11-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organization during the period from April 1990 through June 1990

  20. ASME section XI: rules for inservice inspection of nuclear power plants -an introspection

    International Nuclear Information System (INIS)

    John, P.K.; Anto, Y.; Mungikar, C.P.; Wagh, P.M.

    1994-01-01

    Section XI of the ASME BPV code is addressed to the examination, test and inspection requirements of the components of nuclear power plants (NPPs). Since its inception in 1970, this code section has undergone vast changes -probably the most among other ASME BPV code sections. Section XI is full fledged and lays down requirements with regard to all preservice inspections, inservice inspection, repair and replacement of components, tests of system etc. Tarapur Atomic Power Station (TAPS) has the distinction of being one of the earliest BWR type NPPs in the world that has an inservice inspection programme organised in line with the ASME section XI requirements. This paper summarises the experiences gained from time to time using this code section and a few suggestions to prospective users. An effort is also made to explain the philosophy of inservice inspection from ASME section XI point of view. 3 refs

  1. ASME section XI: rules for inservice inspection of nuclear power plants -an introspection

    Energy Technology Data Exchange (ETDEWEB)

    John, P K; Anto, Y; Mungikar, C P; Wagh, P M [Nuclear Power Corporation of India Ltd., Tarapur (India). Tarapur Atomic Power Station

    1994-12-31

    Section XI of the ASME BPV code is addressed to the examination, test and inspection requirements of the components of nuclear power plants (NPPs). Since its inception in 1970, this code section has undergone vast changes -probably the most among other ASME BPV code sections. Section XI is full fledged and lays down requirements with regard to all preservice inspections, inservice inspection, repair and replacement of components, tests of system etc. Tarapur Atomic Power Station (TAPS) has the distinction of being one of the earliest BWR type NPPs in the world that has an inservice inspection programme organised in line with the ASME section XI requirements. This paper summarises the experiences gained from time to time using this code section and a few suggestions to prospective users. An effort is also made to explain the philosophy of inservice inspection from ASME section XI point of view. 3 refs.

  2. Experience in safeguarding nuclear material at the Rheinsberg nuclear power station

    International Nuclear Information System (INIS)

    Winkler, R.

    1976-01-01

    The three years' experience that has been gained in application of the Safeguards Agreement shows that the carrying out of inspections at the nuclear power plant has virtually no effect on operating conditions. In future it will be possible to reduce this effect even further and still maintain the operational reliability of the station. Verification of the transfer of nuclear material and detection of possible violations have proved relatively simple. The labour requirement of each unit at the station for the performance of inspections is not more that thirty man-days. Constructive collaboration between power station staff and inspectors is of great importance in improving the safeguards procedures. (author)

  3. Fully Employing Software Inspections Data

    Science.gov (United States)

    Shull, Forrest; Feldmann, Raimund L.; Seaman, Carolyn; Regardie, Myrna; Godfrey, Sally

    2009-01-01

    Software inspections provide a proven approach to quality assurance for software products of all kinds, including requirements, design, code, test plans, among others. Common to all inspections is the aim of finding and fixing defects as early as possible, and thereby providing cost savings by minimizing the amount of rework necessary later in the lifecycle. Measurement data, such as the number and type of found defects and the effort spent by the inspection team, provide not only direct feedback about the software product to the project team but are also valuable for process improvement activities. In this paper, we discuss NASA's use of software inspections and the rich set of data that has resulted. In particular, we present results from analysis of inspection data that illustrate the benefits of fully utilizing that data for process improvement at several levels. Examining such data across multiple inspections or projects allows team members to monitor and trigger cross project improvements. Such improvements may focus on the software development processes of the whole organization as well as improvements to the applied inspection process itself.

  4. Advanced ultrasonic inspections

    International Nuclear Information System (INIS)

    Ghia, S.

    1990-08-01

    Acoustic Emission (AE) continuous monitoring and periodical inspections by advanced ultrasonic have been applied to evaluate defect evolution within a PWR reduced scale (1:5) pressure vessel subjected to cyclic mechanical fatigue test. This experimental activity has been carried out in the frame of the Primary Circuit Component Life Prediction programme. In the time period covered by this report actions were performed as following: (1) Ultrasonic examination by multifrequency acoustic holography to evaluate defect evolution subsequently repair and heat treatment of the R2 vessel carried out in March 1988. For the purpose, measurements were performed both at 0 and 200 bar of internal pressure. As uniformity of the procedures adopted, for calibration and testing, made the results comparable with the previous ones no evidence for significant growing of the examined defects has been found. (2) Acoustic emission monitoring has then been carried out during fatigue test from 416000 to 565000 fatigue cycles. Analysis of a large amount of data has been performed paying particular attention to the distinction between friction phenomena and crack growth in order to obtain a correct diagnosis of flaw evolution. The signal duration distribution and the correlation of AE appearance time versus load cycle phase were considered to characterise stick-slip processes. A general intensification of AE activity has been recorded during this last period of monitoring and previous known AE sources were confirmed together with the appearance of new AE sources some of them correlable with real defects

  5. From PISC to risk informed inspection

    International Nuclear Information System (INIS)

    Crutzen, S.; Lemaitre, P.; Fabbri, L.

    1998-01-01

    In this paper the correlation between inspection effectiveness, inspection qualification and risk informed inspection will be treated in view of harmonisation of inspection of nuclear plant components. Through the different phases of the PISC programme the necessity has been demonstrated to show the effectiveness of the inspection through a formal process of qualification in order to ensure that a certain level of effectiveness has been reached. Inspection qualification is indeed the way to quantify the capability level of inspection techniques used. The targets to be met by the inspection is information which should be obtained from risk based analyses. (author)

  6. Russian RSC Energia employees inspect DM in SSPF

    Science.gov (United States)

    1995-01-01

    Employees of the Russian aerospace company RSC Energia prepare to conduct final inspections of the Russian-built Docking Module in the Space Station Processing Facility at KSC. The module will fly as a primary payload on the second Space Shuttle/Mir space station docking mission, STS-74, which is now scheduled for liftoff in the fall of 1995. During the mission, the module will first be attached with the orbiter's robot arm to the Orbiter Docking System (ODS) in the payload bay of the orbiter Atlantis and then be docked with the Mir. When Atlantis undocks from the Mir, it will leave the new docking module permanently attached to the space station for use during future Shuttle Mir docking missions. The new module will simplify future Shuttle linkups with Mir by improving orbiter clearances when it serves as a bridge between the two space vehicles.

  7. Plant inspection and maintenance technology

    International Nuclear Information System (INIS)

    Miyahara, Masatoshi; Kanazawa, Masafumi

    1995-01-01

    The article reports on information systems and related tools that support routine inspection and preventive maintenance activities, which contribute to safer plant operation and increase plant operating duty. Tools include the Mitsubishi Electric Reliability and Availability Upgrade Program-Nuclear (MELRAP-N), which supports the general evolution of industry operating experiences, periodic component replacement management, management of discontinued and modified components, periodic inspection item management, and periodic inspection workplace management. The article also introduces a comprehensive preventive maintenance management system currently under development. (author)

  8. Non-destructive inservice inspections

    International Nuclear Information System (INIS)

    Kauppinen, P.; Sarkimo, M.; Lahdenperae, K.

    1998-01-01

    In order to assess the possible damages occurring in the components and structures of operating nuclear power plants during service the main components and structures are periodically inspected by non-destructive testing techniques. The reliability of non-destructive testing techniques applied in these inservice inspections is of major importance because the decisions concerning the needs for repair of components are mainly based on the results of inspections. One of the targets of this research program has been to improve the reliability of non-destructive testing. This has been addressed in the sub-projects which are briefly summarised here. (author)

  9. Smart Infrared Inspection System Field Operational Test Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Siekmann, Adam [ORNL; Capps, Gary J [ORNL; Franzese, Oscar [ORNL; Lascurain, Mary Beth [ORNL

    2011-06-01

    The Smart InfraRed Inspection System (SIRIS) is a tool designed to assist inspectors in determining which vehicles passing through the SIRIS system are in need of further inspection by measuring the thermal data from the wheel components. As a vehicle enters the system, infrared cameras on the road measure temperatures of the brakes, tires, and wheel bearings on both wheel ends of commercial motor vehicles (CMVs) in motion. This thermal data is then presented to enforcement personal inside of the inspection station on a user friendly interface. Vehicles that are suspected to have a violation are automatically alerted to the enforcement staff. The main goal of the SIRIS field operational test (FOT) was to collect data to evaluate the performance of the prototype system and determine the viability of such a system being used for commercial motor vehicle enforcement. From March 2010 to September 2010, ORNL facilitated the SIRIS FOT at the Greene County Inspection Station (IS) in Greeneville, Tennessee. During the course of the FOT, 413 CMVs were given a North American Standard (NAS) Level-1 inspection. Of those 413 CMVs, 384 were subjected to a SIRIS screening. A total of 36 (9.38%) of the vehicles were flagged by SIRIS as having one or more thermal issues; with brakes issues making up 33 (91.67%) of those. Of the 36 vehicles flagged as having thermal issues, 31 (86.11%) were found to have a violation and 30 (83.33%) of those vehicles were placed out-of-service (OOS). Overall the enforcement personnel who have used SIRIS for screening purposes have had positive feedback on the potential of SIRIS. With improvements in detection algorithms and stability, the system will be beneficial to the CMV enforcement community and increase overall trooper productivity by accurately identifying a higher percentage of CMVs to be placed OOS with minimal error. No future evaluation of SIRIS has been deemed necessary and specifications for a production system will soon be drafted.

  10. Inspection of NFT-type cask fabrication

    International Nuclear Information System (INIS)

    Takani, M.; Umegaki, O.

    1998-01-01

    NFT-type cask has been developed to transport the high burn-up spent fuel from Japanese nuclear power stations to the reprocessing plant of Japan Nuclear Fuel Limited which is under construction in Rokkasho-mura, Aomori prefecture. NFT placed orders of 53 casks to 5 fabricators in Japan and overseas, and these casks have been fabricated since 1994. There are two types of NFT-type casks for PWR spent fuel and four types of NFT-type cask for BWR spent fuel. These are designed in consideration of the number of spent fuels accommodated into each type of casks and the handling conditions at domestic nuclear power stations. According to Japanese notification, it is required to be confirmed by competent authority that casks are manufactured in accordance with approved designs. Furthermore, additional tests are performed such as through-gauge test for basket and pressure test on the shielding material space to ensure the performance of cask by NFT other than items inspected by the competent authority. In order to enhance maintainability of casks, replacement parts such as bolts and valves are shared as much as possible. (authors)

  11. Non-Coop Station History

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Station history documentation for stations outside the US Cooperative Observer network. Primarily National Weather Service stations assigned WBAN station IDs. Other...

  12. Apparatus for assembling and welding end plugs to nuclear fuel cladding tubes and inspecting the end plug welds on an automated basis

    International Nuclear Information System (INIS)

    Schoenig, F.C. Jr.; Walker, E.S.; Cueman, M.K.; Haughton, R.A.; Zuloaga, J.A. Jr.

    1989-01-01

    This patent describes an automated apparatus for welding a separate end plug to one open end of each of a succession of nuclear fuel cladding tubes and for inspecting each end plug weld. The apparatus comprising, in combination: a welding station; a cooldown station for cooling each end plug weld in an inert gas atmosphere; a serial number reader station for reading a serial number on each end plug; a first weld inspection station; a second weld inspection station for generating second weld inspection data; a computer system linked with the serial number reader and the first and second weld inspection stations; an input queue for holding a plurality of tubes; a tube transporter for periodically picking individual tubes from the input queque and conveying the tubes in a direction transverse to their tube axis in indexing steps to index positions respectively axially aligned with the welding, serial number reader, and first and second weld inspection stations; and a sorter positioned at an output end of the tube transporter

  13. Multifamily Housing Physical Inspection Scores

    Data.gov (United States)

    Department of Housing and Urban Development — HUD's Real Estate Assessment Center conducts physical property inspections of properties that are owned, insured or subsidized by HUD, including public housing and...

  14. Incore inspection and repairing device

    International Nuclear Information System (INIS)

    Ito, Arata; Kimura, Motohiko

    1998-01-01

    The present invention provides a device for inspecting and repairing the inside of a reactor container even if it is narrow, with no trouble by using a swimming-type operation robot. Namely, the device of the present invention conducts inspection and repairing operations for the inside of the reactor by introducing a swimming type operation robot into the reactor container. The swimming-type operation robot comprises a robot main body having a propeller, a balancer operably disposed to the robot main body and an inspection and repairing unit attached detachable to the balancer. In the device of the present invention, since the inspection and preparing unit is attached detachably to the swimming robot, a robot which transports tools is formed as a standard product. As a result, the production cost can be reduced, and the reliability of products can be improved. Appropriate operations can be conducted by using best tools. (I.S.)

  15. In-service inspection techniques

    International Nuclear Information System (INIS)

    Backfisch, W.; Zipser, R.R.

    1980-01-01

    The owner of a nuclear power plant (NPP) is obligated and interested to maintain - by regular maintenance and in-service inspections - the operational safety and availability of the plant for the subsequent operating period in a condition, as is specified as the basis of the erection and the last operational permits. In-service inspections are performed to verify the operational safety, and maintenance work is performed to guarantee the availability. Below, the typical in-service inspections of a light-water reactor NPP (operated on a pressurized-water reactor or on a boiling-water reactor) are described with details and examples of typical inspections, especially of recurrent performance tests of the systems. (orig./RW)

  16. Knowledge-Based Inspection Capabilities

    National Research Council Canada - National Science Library

    Marrano, Lance R; Grussing, Michael N

    2006-01-01

    ... does not present a compelling safety hazard. Abandoning certain inspection programs to reduce costs is not a viable alternative, however, because that could degrade real property investments, soldier quality of life, and mission-readiness...

  17. Construction inspection manual of procedures

    Science.gov (United States)

    2009-01-01

    This manual provides highway construction personnel with relevant, practical information in order to perform accurate inspections and provide relevant construction procedural information for the various roadway and structures items of work. It is the...

  18. National Automated Conformity Inspection Process -

    Data.gov (United States)

    Department of Transportation — The National Automated Conformity Inspection Process (NACIP) Application is intended to expedite the workflow process as it pertains to the FAA Form 81 0-10 Request...

  19. Public Housing Physical Inspection Scores

    Data.gov (United States)

    Department of Housing and Urban Development — HUD's Real Estate Assessment Center conducts physical property inspections of properties that are owned, insured or subsidized by HUD, including public housing and...

  20. Ultrasonic inspection of austenitic welds

    Energy Technology Data Exchange (ETDEWEB)

    Tomlinson, J R; Wagg, A R; Whittle, M J [N.D.T. Applications Centre, CEGB, Manchester (United Kingdom)

    1980-11-01

    The metallurgical structure of austenitic welds is described and contrasted with that found in ferritic welds. It is shown that this structure imparts a marked elastic anisotropy in the ultrasonic propagation parameters. Measurements of variations in the apparent attenuation of sound and deviations in the beam direction are described. The measurements are interpreted in terms of the measured velocity anisotropy. Two applications of the fundamental work are described. In the first it is shown how, by using short pulse compression wave probes, and with major modification of the welding procedure, a stainless steel fillet weld in an AGR boiler can be inspected. In the second application, alternative designs of a transition butt weld have been compared for ease of ultrasonic inspection. The effects of two different welding processes on such an inspection are described. Finally, the paper examines the prospects for future development of inspection and defect-sizing techniques for austenitic welds. (author)

  1. Sea bed mapping and inspection

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    The conference has 24 presentations on the topics: Sea bed mapping, inspection, positioning, hydrography, marine archaeology, remote operation vehicles and computerized simulation technologies, oil field activities and plans, technological experiences and problems. (tk)

  2. Gravity Probe B Inspection

    Science.gov (United States)

    2000-01-01

    The space vehicle Gravity Probe B (GP-B) is the relativity experiment developed at Stanford University to test two extraordinary predictions of Albert Einstein's general theory of relativity. The experiment will measure, very precisely, the expected tiny changes in the direction of the spin axes of four gyroscopes contained in an Earth-orbiting satellite at a 400-mile altitude. So free are the gyroscopes from disturbance that they will provide an almost perfect space-time reference system. They will measure how space and time are very slightly warped by the presence of the Earth, and, more profoundly, how the Earth's rotation very slightly drags space-time around with it. These effects, though small for the Earth, have far-reaching implications for the nature of matter and the structure of the Universe. GP-B is among the most thoroughly researched programs ever undertaken by NASA. This is the story of a scientific quest in which physicists and engineers have collaborated closely over many years. Inspired by their quest, they have invented a whole range of technologies that are already enlivening other branches of science and engineering. In this photograph, engineer Gary Reynolds is inspecting the inside of the probe neck during probe thermal repairs. GP-B is scheduled for launch in April 2004 and managed for NASA by the Marshall Space Flight Center. Development of the GP-B is the responsibility of Stanford University along with major subcontractor Lockheed Martin Corporation. (Image credit to Russ Leese, Gravity Probe B, Stanford University)

  3. Nuclear reactor vessel inspection apparatus

    International Nuclear Information System (INIS)

    Blackstone, E.G.; Lofy, R.A.; Williams, L.P.

    1979-01-01

    Apparatus for the in situ inspection of a nuclear reactor vessel to detect the location and character of flaws in the walls of the vessel, in the welds joining the various sections of the vessel, in the welds joining attachments such as nozzles, elbows and the like to the reactor vessel and in such attachments wherein an inspection head carrying one or more ultrasonic transducers follows predetermined paths in scanning the various reactor sections, welds and attachments

  4. Austenitic stainless steel weld inspection

    International Nuclear Information System (INIS)

    Mech, S.J.; Emmons, J.S.; Michaels, T.E.

    1978-01-01

    Analytical techniques applied to ultrasonic waveforms obtained from inspection of austenitic stainless steel welds are described. Experimental results obtained from a variety of geometric and defect reflectors are presented. Specifically, frequency analyses parameters, such as simple moments of the power spectrum, cross-correlation techniques, and adaptive learning network analysis, all represent improvements over conventional time domain analysis of ultrasonic waveforms. Results for each of these methods are presented, and the overall inspection difficulties of austenitic stainless steel welds are discussed

  5. Automated visual inspection of textile

    DEFF Research Database (Denmark)

    Jensen, Rune Fisker; Carstensen, Jens Michael

    1997-01-01

    A method for automated inspection of two types of textile is presented. The goal of the inspection is to determine defects in the textile. A prototype is constructed for simulating the textile production line. At the prototype the images of the textile are acquired by a high speed line scan camera...... the protype to a production line system we only need to gain a speed factor of 4....

  6. Base Station Performance Model

    OpenAIRE

    Walsh, Barbara; Farrell, Ronan

    2005-01-01

    At present the testing of power amplifiers within base station transmitters is limited to testing at component level as opposed to testing at the system level. While the detection of catastrophic failure is possible, that of performance degradation is not. This paper proposes a base station model with respect to transmitter output power with the aim of introducing system level monitoring of the power amplifier behaviour within the base station. Our model reflects the expe...

  7. Ultrasonic inspection of inpile tubes

    International Nuclear Information System (INIS)

    Boyd, D.M.; Bossi, H.

    1985-01-01

    The in-service inspection (ISI) of inpile tubes can be performed accurately and safely with a semiautomatic ultrasonic inspection system. The ultrasonic technique uses a set of multiple transducers to detect and size cracks, voids, and laminations radially and circumferentially. Welds are also inspected for defects. The system is designed to inspect stainless steel and Inconel tubes ranging from 53.8 mm (2.12 in.) to 101.6 mm (4 in.) inner diameter with wall thickness on the order of 5 mm. The inspection head contains seven transducers mounted in a surface-following device. Six angle-beam transducers generate shear waves in the tubes. Two of the six are oriented to detect circumferential cracks, and two detect axial cracks. Although each of these four transducers is used in the pulse-echo mode, they are oriented in aligned sets so pitch-catch operation is possible if desired. The remaining angle-beam transducers are angulated to detect flaws that are off axial or circumferential orientation. The seventh transducer is used for longitudinal inspection and detects and sizes laminar-type defects

  8. Amtrak Rail Stations (National)

    Data.gov (United States)

    Department of Transportation — Updated database of the Federal Railroad Administration's (FRA) Amtrak Station database. This database is a geographic data set containing Amtrak intercity railroad...

  9. The structural integrity safety case for Sizewell B power station

    International Nuclear Information System (INIS)

    Gerachty, J.E.

    1993-01-01

    This paper presents the safety case approach adopted for the components of the Sizewell 'B' Power Station for which a high degree of structural integrity is required. Such components include the Reactor Pressure Vessel, Steam Generator and Pressuriser for which Incredibility of Failure is claimed. The two parts of the case involve achievement and demonstration of integrity. This is achieved by extensive measures involving design, manufacture, materials and inspection. The demonstration has required a fracture mechanics approach. The specific role of inspection validation and its relation to critical defect size is described. (author)

  10. Task of radiation hygiene inspection at NPPs

    International Nuclear Information System (INIS)

    Shevts, J.; Kunz, Eh.

    1983-01-01

    The task and functions of the radiation-hygiene inspection in Czechoslovakia are presented. The radiation safety related information amounts that are to be presented to the hygiene inspection institutions are determined. The hygiene inspection content and forms at the stages of NPP designing, construction and operation are discussed. The hygiene inspection place is determined within the general radiation safety system [ru

  11. Automated ultrasonic inspection of nuclear plant components

    International Nuclear Information System (INIS)

    Baron, J.A.; Dolbey, M.P.

    1982-01-01

    For reasons of safety and efficiency, automated systems are used in performing ultrasonic inspection of nuclear components. An automated system designed specifically for the inspection of headers in a nuclear plant is described. In-service inspection results obtained with this system are shown to correlate with pre-service inspection results obtained by manual methods

  12. ROBOTIC TANK INSPECTION END EFFECTOR

    International Nuclear Information System (INIS)

    Rachel Landry

    1999-01-01

    The objective of this contract between Oceaneering Space Systems (OSS) and the Department of Energy (DOE) was to provide a tool for the DOE to inspect the inside tank walls of underground radioactive waste storage tanks in their tank farms. Some of these tanks are suspected to have leaks, but the harsh nature of the environment within the tanks precludes human inspection of tank walls. As a result of these conditions only a few inspection methods can fulfill this task. Of the methods available, OSS chose to pursue Alternating Current Field Measurement (ACFM), because it does not require clean surfaces for inspection, nor any contact with the Surface being inspected, and introduces no extra by-products in the inspection process (no coupling fluids or residues are left behind). The tool produced by OSS is the Robotic Tank Inspection End Effector (RTIEE), which is initially deployed on the tip of the Light Duty Utility Arm (LDUA). The RTEE combines ACFM with a color video camera for both electromagnetic and visual inspection The complete package consists of an end effector, its corresponding electronics and software, and a user's manual to guide the operator through an inspection. The system has both coarse and fine inspection modes and allows the user to catalog defects and suspected areas of leakage in a database for further examination, which may lead to emptying the tank for repair, decommissioning, etc.. The following is an updated report to OSS document OSS-21100-7002, which was submitted in 1995. During the course of the contract, two related sub-tasks arose, the Wall and Coating Thickness Sensor and the Vacuum Scarifying and Sampling Tool Assembly. The first of these sub-tasks was intended to evaluate the corrosion and wall thinning of 55-gallon steel drums. The second was retrieved and characterized the waste material trapped inside the annulus region of the underground tanks on the DOE's tank farms. While these sub-tasks were derived from the original intent

  13. Nuclear safeguards control in nuclear power stations

    International Nuclear Information System (INIS)

    Boedege, R.; Braatz, U.; Heger, H.

    1976-01-01

    The execution of the Non-Proliferation Treaty (NPT) has initiated a third phase in the efforts taken to ensure peace by limiting the number of atomic powers. In this phase it is important, above all, to turn into workable systems the conditions imposed upon technology by the different provisions of the Verification Agreement of the NPT. This is achieved mainly by elaborating annexes to the Agreement specifically geared to certain model plants, typical representatives selected for LWR power stations being the plants at Garigliano, Italy (BWR), and Stade, Federal Republic of Germany (PWR). The surveillance measures taken to prevent any diversion of special nuclear material for purposes of nuclear weapons manufacture must be effective in achieving their specific objective and must not impede the circumspect management of operations of the plants concerned. A VDEW working party has studied the technical details of the planned surveillance measures in nuclear power stations in the Federal Republic of Germany and now presents a concept of material balancing by units which meets the conditions imposed by the inspection authority and could also be accepted by the operators of nuclear power stations. The concept provides for uninterrupted control of the material balance areas of the nuclear power stations concerned, allows continuous control of the whole nuclear fuel cycle, is based exclusively on existing methods and facilities, and can be implemented at low cost. (orig.) [de

  14. OSE inspection of protection program operations field perspective of inspections

    International Nuclear Information System (INIS)

    Brown, R.W.; Martin, H.R.

    1987-01-01

    Protection Program Operations includes three functional areas: Physical Protection Systems, Protective Forces, and System Performance Testing. The Office of Security Evaluations (OSE) inspects field offices in these areas by evaluating programs relative to Standards and Criteria and by performing a variety of exercises and other types of tests to assure protective systems are effective and maintained at a proper level to meet the defined threat. Their perception of the OSE inspections has been positive. The approach taken by ID, with key areas/activities emphasized, during each phase of the field inspection process is described in this report. The most important areas for field offices to concentrate are: inspection preparations through self-evaluation, improving communications, assigning knowledgeable trusted agents, increasing awareness of facility procedures and operations, and assuring daily validations of inspected areas. Emphasis is placed on striving for a balance in reporting both positive and negative findings, and for consistency between ratings and the importance of report findings. OSE efforts to develop improved rating methodologies are encouraged

  15. Space Shuttle Communications Coverage Analysis for Thermal Tile Inspection

    Science.gov (United States)

    Kroll, Quin D.; Hwu, Shian U.; Upanavage, Matthew; Boster, John P.; Chavez, Mark A.

    2009-01-01

    The space shuttle ultra-high frequency Space-to-Space Communication System has to provide adequate communication coverage for astronauts who are performing thermal tile inspection and repair on the underside of the space shuttle orbiter (SSO). Careful planning and quantitative assessment are necessary to ensure successful system operations and mission safety in this work environment. This study assesses communication systems performance for astronauts who are working in the underside, non-line-of-sight shadow region on the space shuttle. All of the space shuttle and International Space Station (ISS) transmitting antennas are blocked by the SSO structure. To ensure communication coverage at planned inspection worksites, the signal strength and link margin between the SSO/ISS antennas and the extravehicular activity astronauts, whose line-of-sight is blocked by vehicle structure, was analyzed. Investigations were performed using rigorous computational electromagnetic modeling techniques. Signal strength was obtained by computing the reflected and diffracted fields along the signal propagation paths between transmitting and receiving antennas. Radio frequency (RF) coverage was determined for thermal tile inspection and repair missions using the results of this computation. Analysis results from this paper are important in formulating the limits on reliable communication range and RF coverage at planned underside inspection and repair worksites.

  16. Secure base stations

    NARCIS (Netherlands)

    Bosch, Peter; Brusilovsky, Alec; McLellan, Rae; Mullender, Sape J.; Polakos, Paul

    2009-01-01

    With the introduction of the third generation (3G) Universal Mobile Telecommunications System (UMTS) base station router (BSR) and fourth generation (4G) base stations, such as the 3rd Generation Partnership Project (3GPP) Long Term Evolution (LTE) Evolved Node B (eNB), it has become important to

  17. INTERACT Station Catalogue - 2015

    DEFF Research Database (Denmark)

    INTERACT stations are located in all major environmental envelopes of the Arctic providing an ideal platform for studying climate change and its impact on the environment and local communities. Since alpine environments face similar changes and challenges as the Arctic, the INTERACT network also ...... catalogue includes descriptions of 73 research stations included in the network at the time of printing....

  18. Meyrin Petrol Station

    CERN Multimedia

    2006-01-01

    Please note that the Meyrin petrol station will be closed for maintenance work on Tuesday 19 and Wednesday 20 December 2006. If you require petrol during this period we invite you to use the Prévessin petrol station, which will remain open. TS-IC-LO Section Tel.: 77039 - 73793

  19. Nuclear power stations licensing

    International Nuclear Information System (INIS)

    Solito, J.

    1978-04-01

    The judicial aspects of nuclear stations licensing are presented. The licensing systems of the United States, Spain, France and Federal Republic of Germany are focused. The decree n 0 60.824 from July 7 sup(th), 1967 and the following legislation which define the systematic and area of competence in nuclear stations licensing are analysed [pt

  20. SPS rectifier stations

    CERN Multimedia

    CERN PhotoLab

    1974-01-01

    The first of the twelves SPS rectifier stations for the bending magnets arrived at CERN at the end of the year. The photograph shows a station with the rectifiers on the left and in the other three cubicles the chokes, capacitors and resistor of the passive filter.

  1. Ondergronds Station Blijdorp, Rotterdam

    NARCIS (Netherlands)

    Hijma, M.P.|info:eu-repo/dai/nl/266562426; Cohen, K.M.|info:eu-repo/dai/nl/185633374

    2014-01-01

    Het is in de herfst van 2005. Een lief meisje, Marieke, rijdt op haar vouwfiets door Rotterdam. Bij het Centraal Station is het al tijden een grote bouwplaats. Onder de nieuwe hal komt een veel groter metrostation en ook onder de Statenweg in Blijdorp is een grote bouwput voor een nieuw station.

  2. Do school inspections improve primary school performance?

    OpenAIRE

    Dinand Webbink; Rob Luginbuhl; I. de Wolf

    2007-01-01

    Inspectors from the Dutch Inspectorate of Education inspect primary schools, write inspection reports on each inspected school, and make recommendations as to how each school can improve. We test whether these inspections result in better school performance. Using a fixed-effects model, we find evidence that school inspections do lead to measurably better school performance. Our assessment of school performance is based on the Cito test scores of pupils in their final year of primary school. ...

  3. Development of Inspection Robots for Bridge Cables

    Directory of Open Access Journals (Sweden)

    Hae-Bum Yun

    2013-01-01

    Full Text Available This paper presents the bridge cable inspection robot developed in Korea. Two types of the cable inspection robots were developed for cable-suspension bridges and cable-stayed bridge. The design of the robot system and performance of the NDT techniques associated with the cable inspection robot are discussed. A review on recent advances in emerging robot-based inspection technologies for bridge cables and current bridge cable inspection methods is also presented.

  4. Development of inspection robots for bridge cables.

    Science.gov (United States)

    Yun, Hae-Bum; Kim, Se-Hoon; Wu, Liuliu; Lee, Jong-Jae

    2013-01-01

    This paper presents the bridge cable inspection robot developed in Korea. Two types of the cable inspection robots were developed for cable-suspension bridges and cable-stayed bridge. The design of the robot system and performance of the NDT techniques associated with the cable inspection robot are discussed. A review on recent advances in emerging robot-based inspection technologies for bridge cables and current bridge cable inspection methods is also presented.

  5. [STEM on Station Education

    Science.gov (United States)

    Lundebjerg, Kristen

    2016-01-01

    The STEM on Station team is part of Education which is part of the External Relations organization (ERO). ERO has traditional goals based around BHAG (Big Hairy Audacious Goal). The BHAG model is simplified to a saying: Everything we do stimulates actions by others to advance human space exploration. The STEM on Station education initiate is a project focused on bringing off the earth research and learning into classrooms. Educational resources such as lesson plans, activities to connect with the space station and STEM related contests are available and hosted by the STEM on Station team along with their partners such as Texas Instruments. These educational activities engage teachers and students in the current happenings aboard the international space station, inspiring the next generation of space explorers.

  6. Central Station Design Options

    DEFF Research Database (Denmark)

    2011-01-01

    . The work identifies the architecture, sizing and siting of prospective Central Stations in Denmark, which can be located at shopping centers, large car parking lots or gas stations. Central Stations are planned to be integrated in the Danish distribution grid. The Danish island of Bornholm, where a high...... overloading, more reference points might be necessary to represent various transformer loading levels. The subject of safety in Central Station is also addressed. A number of safety rules based on European standards apply to AC charging equipment up to 44 kW. The connection interlock and the automatic de......-energization are identified as fundamental requirements for safety in such a charging station. The connection interlock is a solution which ensures that no power is applied to the DC cable when the EV connector is not connected. The automatic de-energization device ensures that whenever a strain on the cable is detected, e...

  7. Examination of the association between announced inspections and inspection scores.

    Science.gov (United States)

    Waters, A Blake; VanDerslice, James; Porucznik, Christina A; Kim, Jaewhan; DeLegge, Royal; Durrant, Lynne

    2013-09-01

    In 2010 the Salt Lake Valley Health Department conducted a pilot of an announced inspection program utilizing a randomized assignment of restaurants to an intervention group with announced inspections and a control group that remained on the usual schedule of unannounced inspections. After adjusting for food type, visible kitchen, outside quality assurance, season, and standardized inspector, significant reductions were found in the odds ratios of personal hygiene (adjusted odds ratios [aOR] = 0.11, p = .00) and equipment cleanliness (aOR = 0.19, p = .00) violations. In the models for the control group, none of the odds ratios were statistically different from one, indicating no change in the postintervention time period as compared to the preintervention period.

  8. Automated ultrasonic inspection using PULSDAT

    International Nuclear Information System (INIS)

    Naybour, P.J.

    1992-01-01

    PULSDAT (Portable Ultrasonic Data Acquisition Tool) is a system for recording the data from single probe automated ultrasonic inspections. It is one of a range of instruments and software developed by Nuclear Electric to carry out a wide variety of high quality ultrasonic inspections. These vary from simple semi-automated inspections through to multi-probe, highly automated ones. PULSDAT runs under the control of MIPS software, and collects data which is compatible with the GUIDE data display system. PULSDAT is therefore fully compatible with Nuclear Electric's multi-probe inspection systems and utilises all the reliability and quality assurance of the software. It is a rugged, portable system that can be used in areas of difficult access. The paper discusses the benefits of automated inspection and gives an outline of the main features of PULSDAT. Since April 1990 PULSDAT has been used in several applications within Nuclear Electric and this paper presents two examples: the first is a ferritic set-through nozzle and the second is an austenitic fillet weld. (Author)

  9. Machine vision inspection of lace using a neural network

    Science.gov (United States)

    Sanby, Christopher; Norton-Wayne, Leonard

    1995-03-01

    Lace is particularly difficult to inspect using machine vision since it comprises a fine and complex pattern of threads which must be verified, on line and in real time. Small distortions in the pattern are unavoidable. This paper describes instrumentation for inspecting lace actually on the knitting machine. A CCD linescan camera synchronized to machine motions grabs an image of the lace. Differences between this lace image and a perfect prototype image are detected by comparison methods, thresholding techniques, and finally, a neural network (to distinguish real defects from false alarms). Though produced originally in a laboratory on SUN Sparc work-stations, the processing has subsequently been implemented on a 50 Mhz 486 PC-look-alike. Successful operation has been demonstrated in a factory, but over a restricted width. Full width coverage awaits provision of faster processing.

  10. Hydraulic oil control system for transformer stations

    International Nuclear Information System (INIS)

    Truong, P.

    2002-01-01

    'Full text:' Electrical oil control systems are commonly used to contain large volumes of spilled oil in transformer stations. Specially calibrated floats, some of which are designed to float only in oil and others only in water, are used in combination with a pump to contain oil at the catch basin below a transformer station.This electrical control system requires frequent maintenance and inspections to ensure the electrical system is not affected by any electrical surges. Also the floats need to be inspected and cleaned frequently to prevent oil or grit build up that may affect the systems' ability to contain oil.Recognizing the limitations of electrical oil control systems, Hydro One is investigating alternative control systems. A hydraulic oil control system is being investigated as an alternative which can backup oil in a containment area while allowing any water entering the containment area to pass through. Figure 1 shows a schematic of a bench-top model tested at Ryerson University. Oil and water separation occurs within the double-piped column. Oil and water are allowed to enter the external pipe column but only water is allowed to exit the internal pipe column. The internal pipe column is designed to generate enough hydrostatic pressure to ensure the oil is contained in the external pipe column.The hydraulic oil control system provides a reliable control mechanism and requires less maintenance compared to that of the electrical control system. Since the hydraulic oil control system has no moving parts, nor would any parts that require electricity, it is not affected by electrical surges such as lightening.The maintenance requirements of the hydraulic oil control system are: the removal of any oil and grit from the catch basin, and the occasional visual inspection for any crack or clogs in the system. (author)

  11. STRUVE arc and EUPOS® stations

    Science.gov (United States)

    Lasmane, Ieva; Kaminskis, Janis; Balodis, Janis; Haritonova, Diana

    2013-04-01

    inspection deformation of leveling networks within the European framework of ground based GNSS European positioning augmentation system EUPOS®. The GNSS observation RTCM corrections produced by the EUPOS® system can be used for high precision position determination in various navigation and land surveying applications. Using EUPOS® network together with data from European Combined Geodetic Network (ECGN) and applying Bernese v.5.0 Software it is possible to compare situation of the solid Earth tide caused vertical displacements at the EUPOS® (EUREF) stations which are close to Struve arc within region from Artic Ocean till Black Sea. Scientific staff of LU GGI is looking forward for eventual participation in cooperation and science projects. Supported by ERAF Project 010/0202/2DP/2.1.1.2.0/10/APIA/VIAA/013

  12. Virginia power nuclear power station engineer training program

    International Nuclear Information System (INIS)

    Williams, T.M.; Haberstroh-Timpano, S.

    1987-01-01

    In response to the Institute of Nuclear Power Operations (INPO) accreditation requirements for technical staff and manager, Virginia Power developed the Nuclear Power Station Engineer Training Programs (NPSETP). The NPSETP is directed toward enhancing the specific knowledge and skills of company engineers, especially newly hired engineers. The specific goals of the program are to promote safe and reliable plant operation by providing engineers and appropriate engineering technicians with (1) station-specific basic skills; (2) station-specific specialized skills in the areas of surveillance and test, plant engineering, nuclear safety, and in-service inspection. The training is designed to develop, maintain, and document through demonstration the required knowledge and skills of the engineers in the identified groups at North Anna and Surry Power Stations. The program responds to American National Standards Institute, INPO, and US Nuclear Regulatory Commission standards

  13. Ultrasonic inspection development at HEDL

    International Nuclear Information System (INIS)

    Day, C.K.; Mech, S.J.; Michaels, T.E.; Dixon, N.E.

    1978-01-01

    Ultrasonic testing methods and equipment are being developed to support preservice and in-service inspection of selected FFTF welds. A digital computer system is employed in the analysis of both simulated FFTF pipe sections and plate specimens containing fatigue cracks. It is anticipated that test evaluation standards containing fatigue cracks will partially eliminate questions formerly associated with weld test calibration producers by providing natural cracks which follow grain boundaries and stress patterns resembling piping situ conditions. Studies have revealed that commercial transducers may satisfy LMFBR ultrasonic pipe inspection applications: The test system evaluation included transducers and wedge coupling and fluid coupling materials which exhibited acceptable performance at temperatures to 2300C. Results are presented that demonstrate the feasibility of ultrasonic inspection of components immersed in sodium at temperatures to 2600C. (UK)

  14. [PICS: pharmaceutical inspection cooperation scheme].

    Science.gov (United States)

    Morénas, J

    2009-01-01

    The pharmaceutical inspection cooperation scheme (PICS) is a structure containing 34 participating authorities located worldwide (October 2008). It has been created in 1995 on the basis of the pharmaceutical inspection convention (PIC) settled by the European free trade association (EFTA) in1970. This scheme has different goals as to be an international recognised body in the field of good manufacturing practices (GMP), for training inspectors (by the way of an annual seminar and experts circles related notably to active pharmaceutical ingredients [API], quality risk management, computerized systems, useful for the writing of inspection's aide-memoires). PICS is also leading to high standards for GMP inspectorates (through regular crossed audits) and being a room for exchanges on technical matters between inspectors but also between inspectors and pharmaceutical industry.

  15. Holography for fast reactor inspection

    International Nuclear Information System (INIS)

    Tozer, B.A.

    1980-01-01

    Holography, an optical process whereby an image of the original subject can be reconstructed in three dimensions, is being developed for use as an optical inspection tool. With a potential information storage density of 10 16 bits/m 2 , the ability to reconstruct in 3 dimensions, a depth of field of up to 8 metres, extremely wide angle of view, and potentially diffraction limited resolution, holography should be invaluable for the optical recording of fast reactors during construction, and the inspection of optically accessible regions during operation, or maintenance down-times. The photographic emulsions used for high resolution holography are fine-grained and fog only very slowly when subjected to γ-radiation, so that inspection of highly radio-active regions and components can be effected satisfactorily. Some of the practical limitations affecting holography are described and ways of overcoming them discussed. Some preliminary results are presented. (author)

  16. Defense Treaty Inspection Readiness Program

    International Nuclear Information System (INIS)

    Cronin, J.J.; Kohen, M.D.; Rivers, J.D.

    1996-01-01

    The Defense Treaty Inspection Readiness Program (DTIRP) was established by the Department of Defense in 1990 to assist defense facilities in preparing for treaty verification activities. Led by the On-Site Inspection Agency (OSIA), an element of the Department of Defense, DTIRP''s membership includes representatives from other Department of Defense agencies, the Department of Energy (DOE), the Central Intelligence Agency, the Federal Bureau of Investigation, the Department of Commerce, and others. The Office of Safeguards and Security has a significant interest in this program, due to the number of national defense facilities within its purview that are candidates for future inspections. As a result, the Office of Safeguards and Security has taken a very active role in DTIRP. This paper discusses the Office of Safeguards and Security''s increasing involvement in various elements of the DTIRP, ranging from facility assessments to training development and implementation

  17. Space station operations management

    Science.gov (United States)

    Cannon, Kathleen V.

    1989-01-01

    Space Station Freedom operations management concepts must be responsive to the unique challenges presented by the permanently manned international laboratory. Space Station Freedom will be assembled over a three year period where the operational environment will change as significant capability plateaus are reached. First Element Launch, Man-Tended Capability, and Permanent Manned Capability, represent milestones in operational capability that is increasing toward mature operations capability. Operations management concepts are being developed to accomodate the varying operational capabilities during assembly, as well as the mature operational environment. This paper describes operations management concepts designed to accomodate the uniqueness of Space Station Freedoom, utilizing tools and processes that seek to control operations costs.

  18. Waste Transfer Stations

    DEFF Research Database (Denmark)

    Christensen, Thomas Højlund

    2011-01-01

    tion and transport is usually the most costly part of any waste management system; and when waste is transported over a considerable distance or for a long time, transferring the waste from the collection vehicles to more efficient transportation may be economically beneficial. This involves...... a transfer station where the transfer takes place. These stations may also be accessible by private people, offering flexibility to the waste system, including facilities for bulky waste, household hazardous waste and recyclables. Waste transfer may also take place on the collection route from small...... describes the main features of waste transfer stations, including some considerations about the economical aspects on when transfer is advisable....

  19. Radiation control in the nondestructive inspection

    International Nuclear Information System (INIS)

    Kariya, Yukihiro

    1982-01-01

    In the early days of radiation nondestructive inspection about ten years ago, the loss of radiation sources and careless radiation exposure gave the impression of radiography inspection being immediately slipshod management. In this problem, the peculiar nature of the business in this field is involved. In Nondestructive Inspection Co., Ltd., besides the safety management of radioisotopes, the radiation exposure control of personnel in the regular inspection of nuclear power plants has become increasingly important. The following matters are described: radiation utilization in nondestructive inspection (X- and #betta#-ray radiography, #betta#-ray leak test on shield), radiation control problems in nondestructive inspection business (the peculiar aspects of the business, the analysis of the incidents related with nondestructive inspection), and the practice of radiation control in nondestructive inspection in Nondestructive Inspection Co., Ltd. (Mori, K.)

  20. Rail inspection of RCF defects

    Directory of Open Access Journals (Sweden)

    Z. Popović

    2013-10-01

    Full Text Available Rail defects due to rolling contact fatigue (RCF threaten the traffic safety around the world. That hazard is more distinct on railways without adequate maintenance strategy. Realization of interoperability of European railway network demands from every infrastructure manager to have a maintenance plan for the infrastructure subsystem. Besides that, this plan includes rail inspection and strategy against RCF defects. This paper emphasizes the importance of rail inspection and early detection of RCF because the most of RCF crack should be removed in rail grinding campaigns (preventive, cyclical and corrective activities during the whole rail service life.

  1. Evaluation of inservice inspection examinatiions

    International Nuclear Information System (INIS)

    Aldrich, D.A.; Cook, J.F.

    1990-05-01

    In order to evaluate the effectiveness of Section 11, Division 1, ''Rules for Inservice Inspection of Nuclear Power Plant Components,'' of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code examinations, 26 inservice inspection (ISI) summary reports from 24 facilities were reviewed. It was found that these ASME Code examinations and tests are instrumental in revealing indications and defects in welds and plant components. In addition, this study uncovered that fact that some of the Section 11 requirements are apparently not clear and are misunderstood by some of the facilities. Also, the need for more stringent requirements was evaluated and some Code changes are recommended

  2. Guided acoustic wave inspection system

    Science.gov (United States)

    Chinn, Diane J.

    2004-10-05

    A system for inspecting a conduit for undesirable characteristics. A transducer system induces guided acoustic waves onto said conduit. The transducer system detects the undesirable characteristics of the conduit by receiving guided acoustic waves that contain information about the undesirable characteristics. The conduit has at least two sides and the transducer system utilizes flexural modes of propagation to provide inspection using access from only the one side of the conduit. Cracking is detected with pulse-echo testing using one transducer to both send and receive the guided acoustic waves. Thinning is detected in through-transmission testing where one transducer sends and another transducer receives the guided acoustic waves.

  3. Operational phase of inspection prioritization

    International Nuclear Information System (INIS)

    Campbell, D.J.; Guthrie, V.H.; Flanagan, G.F.

    1986-01-01

    Inspectors must make many decisions on the allocation of their efforts. To date, these decisions have been made based upon their own judgment and guidance from inspection procedures. Our goal is to provide probabilistic risk assessment (PRA) information as an additional aid to inspectors. A structured approach for relating PRA information to specific inspection decisions has been developed. The use of PRA information as an aid in optimal decision making: (1) in response to the current plant status and (2) in the scheduling of effort over an extended period of time is considered

  4. RIMACS, Reactor Inspection Main Control System

    International Nuclear Information System (INIS)

    2008-01-01

    1 - Description of program or function: RIMACS prepares for automatic inspection files on each inspection item for the reactor. These automatic inspection files provide the data to move RIROB (Reactor Inspection Robot) with laser by interpreting the coordinates of LASPO (Laser Positioner) and the laser detecting device of RIROB in three dimensional space. In addition, when RIROB arrives at the inspecting location, the files provide all values of the manipulator's motions to acquire the ultrasonic data. RIMACS provides various modules in order to perform these complex functions, and the functions are programmed on graphic user interface for the convenience of the user. RIMACS provides various functions, such as insertion of reactor production data, selection of the reactor for inspection, the creation of automatic inspection file, the selection of the inspection item, inspection simulation, and automatic inspection procedures. It also provides all other functions, which are necessary for the inspection, such as operating program download and manual control of LASPO and RIROB, the inspection simulation and the inspection status display by means of the graphic screen, and SODAS (ultra-Sonic Data Acquisition System) drive verification. 2 - Methods: Moving path and operation procedures for inspection robot are generated automatically with Kinematics algorithm. 3 - Restrictions on the complexity of the problem: A graphics display with MS-Window capability is required

  5. Northeast Inspection Services, Inc. boresonic inspection system evaluation

    International Nuclear Information System (INIS)

    Nottingham, L.D.; Sabourin, P.F.; Presson, J.H.

    1993-04-01

    Turbine rotor reliability and remaining life assessment are continuing concerns to electric utilities. Over the years, boresonic inspection and evaluation have served as primary components in rotor remaining life assessment. Beginning with an evaluation of TREES by EPRI in 1982, a series of reports that document the detection and sizing capabilities of several boresonic systems have been made available. These studies should provide utilities with a better understanding of system performance and lead to improved reliability when predicting rotor remaining life. In 1990, the procedures followed for evaluating rotor boresonic performance capabilities were changed to transfer a greater portion of the data analysis function to the participating vendor. This change from previous policy was instituted so that the evaluation results would better reflect the ''final answer'' that a vendor would provide in a real rotor inspection and also to reduce the cost of an evaluation. Among the first vendors to participate in the new performance demonstration was Northeast Inspection Services, Inc. (NISI). The tests reported herein were conducted by NISI personnel under the guidelines of the new plan. Details of the new evaluation plan are also presented. Rotor bore blocks containing surface-connected fatigue cracks, embedded glass beads, and embedded radial-axial oriented disks were used in the evaluation. Data were collected during twenty-five independent passes through the blocks. The evaluation consisted of statistical characterization of the detection capabilities, flaw sizing and location accuracy, and repeatability of the inspection system. The results of the evaluation are included in this report

  6. Optimisation of maintenance and inspection work in nuclear power plants

    International Nuclear Information System (INIS)

    Meyer, V.

    1996-01-01

    The long-term planning and comparative evaluation of inspection and maintenance intervals as well as results of electric components and machinery have to be intensified in order to shorten maintenance shut-down periods, e.g. of the Grohnde reactor station, thus improving the availability of the plant and the specific electricity generation cost. Economically efficient maintenance has to be based on an efficient organisational structure. Outsourcing of less plant-specific work and tasks offers the possibility for in-house personnel to concentrate on their core competences. All the measures discussed contribute to improving the economic efficiency of the nuclear power plants. (orig./DG) [de

  7. Moderator inlet line hanger replacement for Pickering nuclear power station

    International Nuclear Information System (INIS)

    Kirkpatrick, R.A.; Bowman, J.M.; Symmons, W.R.; El-Nesr, S.

    1988-01-01

    Ontario Hydro's Pickering Nuclear Generating Station (PNGS), Units 1 and 2 were shutdown for large scale fuel channel replacement. Other nonroutine inspection and maintenance activities were performed to determine the overall condition of the units and it was seen that a moderator inlet line hanger (identified as HR-29) had failed in both units. Subsequent inspections during planned maintenance outages of Pickering NGS Units 3 and 4 revealed that hanger HR-29 had failed and required replacement. A research program was conducted to find a suitable technique. These problems included accessing tooling through small inspection ports, manipulating tooling from a significant distance and the high radiation fields within the vault. This paper describes the program undertaken to replace hanger HR-29. (author)

  8. Safety evaluation for the inner canister closure station

    International Nuclear Information System (INIS)

    Glasscock, J.R.

    1987-01-01

    The Inner Canister Closure Station (ICCS), built by Remote Technology Corporation, will be operability tested. The ICCS is used to remotely leak test Inner Canister Closures (ICC's) and replace ICC's that are not water tight. After operability testing, the ICCS will be inspected and sent to the 717-F mock-up shop for remotability demonstration and dimensional checks, then installed in the Vitrification Building, 221-S. An analysis of potential safety hazards, equipment safety features, and procedural controls indicates that the ICCS can be operated without undue hazard to employees or to the public. A safety inspection and a new equipment inspection will be held before operation to verify that the ICCS meets Savannah River Site safety requirements. 4 refs., 6 figs

  9. "Central Station" Londonis

    Index Scriptorium Estoniae

    2000-01-01

    Londoni galeriis Milch seitsme läti, leedu ja eesti kunstniku projekt "Central Station". Kuraatorid Lisa Panting, Sally Tallant. Eestist osalevad Hanno Soans (Catarina Campinoga koostöös valminud video), Kiwa, Kai Kaljo

  10. Materials Test Station

    Data.gov (United States)

    Federal Laboratory Consortium — When completed, the Materials Test Station at the Los Alamos Neutron Science Center will meet mission need. MTS will provide the only fast-reactor-like irradiation...

  11. Shippingport Station Decommissioning Project

    International Nuclear Information System (INIS)

    McKernan, M.L.

    1989-01-01

    The Shippingport Atomic Power Station was located on the Ohio River in Shippingport Borough (Beaver County), Pennsylvania, USA. The US Atomic Energy Commission (AEC) constructed the plant in the mid-1950s on a seven and half acre parcel of land leased from Duquesne Light Company (DLC). The purposes were to demonstrate and to develop Pressurized Water Recovery technology and to generate electricity. DLC operated the Shippingport plant under supervision of (the successor to AEC) the Department of Energy (DOE)-Naval Reactors (NR) until operations were terminated on October 1, 1982. NR concluded end-of-life testing and defueling in 1984 and transferred the Station's responsibility to DOE Richland Operations Office (RL), Surplus Facility Management Program Office (SFMPO5) on September 5, 1984. SFMPO subsequently established the Shippingport Station Decommissioning Project and selected General Electric (GE) as the Decommissioning Operations Contractor. This report is intended to provide an overview of the Shippingport Station Decommissioning Project

  12. Active Marine Station Metadata

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Active Marine Station Metadata is a daily metadata report for active marine bouy and C-MAN (Coastal Marine Automated Network) platforms from the National Data...

  13. Electrostatic pickup station

    CERN Multimedia

    CERN PhotoLab

    1982-01-01

    Electrostatic pickup station, with 4 interleaved electrodes, to measure beam position in the horizontal and vertical plane. This type is used in the transfer lines leaving the PS (TT2, TT70, TTL2). See also 7904075.

  14. Public Transit Stations

    Data.gov (United States)

    Department of Homeland Security — fixed rail transit stations within the Continental United States, Alaska, Hawaii, the District of Columbia, and Puerto Rico. The modes of transit that are serviced...

  15. Mukilteo Research Station

    Data.gov (United States)

    Federal Laboratory Consortium — Research at the Mukilteo Research Station focuses on understanding the life cycle of marine species and the impacts of ecosystem stressors on anadromous and marine...

  16. Maine Field Station

    Data.gov (United States)

    Federal Laboratory Consortium — In 2000 NOAA's National Marine Fisheries Service established the Maine Field Station in Orono, ME to have more direct involvement in the conservation of the living...

  17. FEMA DFIRM Station Start

    Data.gov (United States)

    Minnesota Department of Natural Resources — This table contains information about station starting locations. These locations indicate the reference point that was used as the origin for distance measurements...

  18. Natural Weathering Exposure Station

    Data.gov (United States)

    Federal Laboratory Consortium — The Corps of Engineers' Treat Island Natural Weathering Exposure Station is a long-term natural weathering facility used to study concrete durability. Located on the...

  19. Routes and Stations

    Data.gov (United States)

    Department of Homeland Security — he Routes_Stations table is composed of fixed rail transit systems within the Continental United States, Alaska, Hawaii, the District of Columbia, and Puerto Rico....

  20. USRCRN Station Information

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Documentation of United States Regional Climate Reference Network (USRCRN) installations in 2009. Installations documented are for USRCRN pilot project stations in...

  1. Gas Stations, US, 2010, NAVTEQ

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Gas_Stations dataset is derived from the Navteq 'AUTOSVC' SDC layer (FAC_TYPE=5540) and contains gas stations and petrol stations. This NAVTEQ dataset is...

  2. Enhanced Master Station History Report

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Enhanced Master Station History Report (EMSHR) is a compiled list of basic, historical information for every station in the station history database, beginning...

  3. Tobruk power station

    Energy Technology Data Exchange (ETDEWEB)

    Boergardts, B

    1978-01-01

    In February of 1975, the Electricity Corporation Benghazi (ECB) awarded a contract for the construction of a turnkey power station and seawater desalination plant in Tobruk, Libya to a consortium under the leadership of BBC Mannheim. This power station has an output of 129 MW and supplies about 24,000 m/sup 3/ of drinking water daily. It went into operation in 1977, two and a half years after the contract was awarded.

  4. Space Station galley design

    Science.gov (United States)

    Trabanino, Rudy; Murphy, George L.; Yakut, M. M.

    1986-01-01

    An Advanced Food Hardware System galley for the initial operating capability (IOC) Space Station is discussed. Space Station will employ food hardware items that have never been flown in space, such as a dishwasher, microwave oven, blender/mixer, bulk food and beverage dispensers, automated food inventory management, a trash compactor, and an advanced technology refrigerator/freezer. These new technologies and designs are described and the trades, design, development, and testing associated with each are summarized.

  5. Leadership at Antarctic Stations.

    Science.gov (United States)

    1987-03-01

    Claseification 6. No. Pegees LEADERSHIP AT ANTARTIC STATIONS hxIs i4 5, C =r~eta(C), 17 Rfs~W (R, Udusiied U)J 7. No Refs 8. Author(s) Edocumesnt I...whether there is a "best" approach to leadership at an Antartic Station and what leadership style may have the most to offer. 3~~ __ ___ Tipesis to be

  6. National Seismic Station

    International Nuclear Information System (INIS)

    Stokes, P.A.

    1982-06-01

    The National Seismic Station was developed to meet the needs of regional or worldwide seismic monitoring of underground nuclear explosions to verify compliance with a nuclear test ban treaty. The Station acquires broadband seismic data and transmits it via satellite to a data center. It is capable of unattended operation for periods of at least a year, and will detect any tampering that could result in the transmission of unauthentic seismic data

  7. The Princess Elisabeth Station

    Science.gov (United States)

    Berte, Johan

    2012-01-01

    Aware of the increasing impact of human activities on the Earth system, Belgian Science Policy Office (Belspo) launched in 1997 a research programme in support of a sustainable development policy. This umbrella programme included the Belgian Scientific Programme on Antarctic Research. The International Polar Foundation, an organization led by the civil engineer and explorer Alain Hubert, was commissioned by the Belgian Federal government in 2004 to design, construct and operate a new Belgian Antarctic Research Station as an element under this umbrella programme. The station was to be designed as a central location for investigating the characteristic sequence of Antarctic geographical regions (polynia, coast, ice shelf, ice sheet, marginal mountain area and dry valleys, inland plateau) within a radius of 200 kilometers (approx.124 miles) of a selected site. The station was also to be designed as "state of the art" with respect to sustainable development, energy consumption, and waste disposal, with a minimum lifetime of 25 years. The goal of the project was to build a station and enable science. So first we needed some basic requirements, which I have listed here; plus we had to finance the station ourselves. Our most important requirement was that we decided to make it a zero emissions station. This was both a philosophical choice as we thought it more consistent with Antarctic Treaty obligations and it was also a logistical advantage. If you are using renewable energy sources, you do not have to bring in all the fuel.

  8. Inservice Inspection in the Fugen

    OpenAIRE

    1983-01-01

    Pressure tube type reactors have specific components orstructures,compared with light water reactors.They are(1) steam drums(2) reactor inlet headers(3) reactor inlet and outlet pipies(4) pressure tubes.Much attention is paid upon Inservice Inspection (ISI)of the above components.

  9. Nuclear fuel shipping inspection device

    International Nuclear Information System (INIS)

    Takahashi, Toshio; Hada, Koji.

    1988-01-01

    Purpose: To provide an nuclear fuel shipping inspection device having a high detection sensitivity and capable of obtaining highly reliable inspection results. Constitution: The present invention concerns a device for distinguishing a fuel assembly having failed fuel rods in LMFBR type reactors. Coolants in a fuel assembly to be inspected are collected by a sampling pipeway and transferred to a filter device. In the filter device, granular radioactive corrosion products (CP) in the coolants are captured, to reduce the background. The coolants, after being passed through the filter device, are transferred to an FP catching device and gamma-rays of iodine and cesium nuclides are measured in FP radiation measuring device. Subsequently, the coolants transferred to a degasing device to separate rare gas FP in the coolants from the liquid phase. In a case if rare gas fission products are detected by the radiation detector, it means that there is a failed fuel rod in the fuel assembly to be inspected. Since the CP and the soluble FP are separated and extracted for the radioactivity measurement, the reliability can be improved. (Kamimura, M.)

  10. FAA Fluorescent Penetrant Laboratory Inspections

    Energy Technology Data Exchange (ETDEWEB)

    WINDES,CONNOR L.; MOORE,DAVID G.

    2000-08-02

    The Federal Aviation Administration Airworthiness Assurance NDI Validation Center currently assesses the capability of various non-destructive inspection (NDI) methods used for analyzing aircraft components. The focus of one such exercise is to evaluate the sensitivity of fluorescent liquid penetrant inspection. A baseline procedure using the water-washable fluorescent penetrant method defines a foundation for comparing the brightness of low cycle fatigue cracks in titanium test panels. The analysis of deviations in the baseline procedure will determine an acceptable range of operation for the steps in the inspection process. The data also gives insight into the depth of each crack and which step(s) of the inspection process most affect penetrant sensitivities. A set of six low cycle fatigue cracks produced in 6.35-mm thick Ti-6Al-4V specimens was used to conduct the experiments to produce sensitivity data. The results will document the consistency of the crack readings and compare previous experiments to find the best parameters for water-washable penetrant.

  11. Artificial Intelligence Assists Ultrasonic Inspection

    Science.gov (United States)

    Schaefer, Lloyd A.; Willenberg, James D.

    1992-01-01

    Subtle indications of flaws extracted from ultrasonic waveforms. Ultrasonic-inspection system uses artificial intelligence to help in identification of hidden flaws in electron-beam-welded castings. System involves application of flaw-classification logic to analysis of ultrasonic waveforms.

  12. Experiences of operation for Ikata Nuclear Power Station

    International Nuclear Information System (INIS)

    Kashimoto, Shigeyuki

    1979-01-01

    No. 1 plant in the Ikata Nuclear Power Station, Shikoku Electric Power Co., Inc., is a two-loop PWR unit with electric output of 566 MW, and it began the commercial operation on September 30, 1977, as the first nuclear power station in Shikoku. It is the 13th LWR and 7th PWR in Japan. The period of construction was 52 months since it had been started in June, 1973. During the period, it became the object of the first administrative litigation to seek the cancellation of permission to install the reactor, and it was subjected to the influence of the violent economical variation due to the oil shock, but it was completed as scheduled. After the start of operation, it continued the satisfactory operation, and generated about 2.35 billion KWh for 4300 operation hours. It achieved the rate of utilization of 96.7%. Since March 28, 1978, the first periodical inspection was carried out, and abnormality was not found in the reactor, the steam generator and the fuel at all. The period of inspection was 79 days and shorter than expected. The commercial operation was started again on June 14. The outline of the Ikata Nuclear Power Station, its state of operation, and the periodical inspection are reported. Very good results were able to be reported on the operation for one year, thanks to the valuable experiences offered by other electric power companies. (Kako, I.)

  13. Routine radiation protection precautions in the turbine areas of nuclear power stations of the boiling water reactor type

    International Nuclear Information System (INIS)

    Meyer, U.; Slavitschek, G.

    1978-01-01

    The need for limiting access to turbine areas in BWR power stations is pointed out, and the advantages of closed circuit TV, aerosol measurements and lead glass windows are discussed. Reference is made to a 1000 MW station now under construction, a floor plan is shown and the need for making inspection/maintenance access as infrequent as possible is stated. Practical tests with CCTV are shown, and it is reported that attention was paid in the design of the station to achieving good visual contrast in areas which might have to be inspected for leaks. (G.M.E.)

  14. Apparatus for integrated fuel assembly inspection system

    International Nuclear Information System (INIS)

    Ahmed, H.J.; Burchill, S.R.

    1988-01-01

    In a fuel assembly inspection apparatus, the combination is described comprising: (a) an elongated fixture mounted in a stationary upright position; (b) upper means mounted to an upper portion of the fixture and lower means mounted adjacent to a lower portion of the fixture, the upper and lower means being disposed outwardly from a side of the fixture for supporting a nuclear fuel assembly therebetween and extending along the side of the fixture; (c) a bottom carriage having a central opening adapted to receive the fuel assembly therethrough when supported between the upper and lower means such that the bottom carriage being connected only to, and extending in cantilever fashion outwardly from, the side of the fixture for generally vertical movement along the side of the fixture and along the fuel assembly extending along the side of the fixture; (d) drive means for selectively moving the bottom carriage; and (e) means disposed on the bottom carriage for measuring the envelop, of the fuel assembly when the bottom carriage is moved to and stationed at selected axial positions along the fuel assembly

  15. Recent Shuttle Post Flight MMOD Inspection Highlights

    Science.gov (United States)

    Hyed, James L.; Christiansen, Eric L.; Lear, Dana M.; Herrin, Jason S.

    2009-01-01

    Post flight inspections on the Space Shuttle Atlantis conducted after the STS-11.5 mission revealed a 0.11 inch (2.8 mm) hole in the outer face sheet of the starboard payload bay door radiator panel #4. The payload bay door radiators in this region are 0.5 inch (12.7 mm) thick aluminum honeycomb with 0.011 in (0.279 mm) thick aluminum face sheets topped with 0.005 in (0.127 mm) silver-Teflon tape. Inner face sheet damage included a 0.267 in (6.78 mm) long through crack with measureable deformation in the area of 0.2 in (5.1 mm). There was also a 0.031 in (0.787 nun) diameter hole in the rear face sheet. A large approximately l in (25 mm) diameter region of honeycomb was also destroyed. Since the radiators are located on the inside of the shuttle payload bay doors which are closed during ascent and reentry, the damage could only have occurred during the on-orbit portion of the mission. During the August 2007 STS-118 mission to the International Space Station, a micro-meteoroid or orbital debris (MMOD) particle impacted and completely penetrated one of shuttle Endeavour's radiator panels and the underlying thermal control system (TCS) blanket, leaving deposits on (but no damage to) the payload bay door. While it is not unusual for shuttle orbiters to be impacted by small MMOD particles, the damage from this impact is larger than any previously seen on the shuttle radiator panels. One of the largest impacts ever observed on a crew module window occurred during the November 2008 STS-126 mission to the International Space Station. Damage to the window was documented by the crew on orbit. Post flight inspection revealed a 0.4 in (10.8 mm) crater in the window pane, with a depth of 0.03 in (0.76 mm). The window pane was replaced due to the damage caused by this impact. Analysis performed on residue contained in dental mold impressions taken of the site indicated that a meteoroid particle produced this large damage site. The post flight inspection after the subsequent

  16. 49 CFR 213.365 - Visual inspections.

    Science.gov (United States)

    2010-10-01

    ... initiate remedial action. (e) Each switch, turnout, track crossing, and lift rail assemblies on moveable bridges shall be inspected on foot at least weekly. The inspection shall be accomplished in accordance...

  17. CAT -- computer aided testing for resonant inspection

    International Nuclear Information System (INIS)

    Foley, David K.

    1998-01-01

    Application of computer technology relates to inspection and quality control. The computer aided testing (CAT) can be used to analyze various NDT technologies, such as eddy current, ultrasonics, and resonant inspection

  18. Allegheny County Housing and Community Environment Inspections

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Residential housing inspections and inspections in response to complaints for community environment problems, such as open vacant structures, vacant lots with...

  19. Machine vision inspection of railroad track

    Science.gov (United States)

    2011-01-10

    North American Railways and the United States Department of Transportation : (US DOT) Federal Railroad Administration (FRA) require periodic inspection of railway : infrastructure to ensure the safety of railway operation. This inspection is a critic...

  20. Allegheny County Weights and Measures Inspections

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Inspections conducted by the Allegheny County Bureau of Weights and Measures. The Bureau inspects weighing and timing devices such as gas pumps, laundromat timers,...

  1. The evidence base for school inspection frameworks

    NARCIS (Netherlands)

    Scheerens, Jaap; Ehren, Melanie Catharina Margaretha; Ehren, Melanie C.M.

    2016-01-01

    This chapter describes how Inspectorates of Education operationalize different inspection goals (control, improvement, and liaison) in their inspection indicator frameworks. The chapter provides an overview and examples of the indicators used across a number of countries and how these are

  2. Experimental Stress Analysis at Railway Inspection Pit

    Directory of Open Access Journals (Sweden)

    Nicuşor Laurentiu Zaharia

    2008-10-01

    Full Text Available Railway inspection pits are used in railway halls. The purpose of inspection pits is to allow the working under the vehicle. Inspection pits can be found in locomotive depots, factories etc. The new design for a inspection pit in a railway hall involve tests in purpose of homologations the railway infrastructure. Before the homologation committee meeting, tests are made; after the test, a testing report is made which it will be part at homologation documents.

  3. UMTS Network Stations

    Science.gov (United States)

    Hernandez, C.

    2010-09-01

    The weakness of small island electrical grids implies a handicap for the electrical generation with renewable energy sources. With the intention of maximizing the installation of photovoltaic generators in the Canary Islands, arises the need to develop a solar forecasting system that allows knowing in advance the amount of PV generated electricity that will be going into the grid, from the installed PV power plants installed in the island. The forecasting tools need to get feedback from real weather data in "real time" from remote weather stations. Nevertheless, the transference of this data to the calculation computer servers is very complicated with the old point to point telecommunication systems that, neither allow the transfer of data from several remote weather stations simultaneously nor high frequency of sampling of weather parameters due to slowness of the connection. This one project has developed a telecommunications infrastructure that allows sensorizadas remote stations, to send data of its sensors, once every minute and simultaneously, to the calculation server running the solar forecasting numerical models. For it, the Canary Islands Institute of Technology has added a sophisticated communications network to its 30 weather stations measuring irradiation at strategic sites, areas with high penetration of photovoltaic generation or that have potential to host in the future photovoltaic power plants connected to the grid. In each one of the stations, irradiance and temperature measurement instruments have been installed, over inclined silicon cell, global radiation on horizontal surface and room temperature. Mobile telephone devices have been installed and programmed in each one of the weather stations, which allow the transfer of their data taking advantage of the UMTS service offered by the local telephone operator. Every minute the computer server running the numerical weather forecasting models receives data inputs from 120 instruments distributed

  4. 49 CFR 396.13 - Driver inspection.

    Science.gov (United States)

    2010-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION FEDERAL MOTOR CARRIER SAFETY REGULATIONS INSPECTION, REPAIR, AND MAINTENANCE § 396.13 Driver inspection. Before driving a motor vehicle, the driver shall: (a) Be satisfied that the motor vehicle is in safe operating condition; (b) Review the last driver vehicle inspection...

  5. A probe for Eddy current inspection devices

    International Nuclear Information System (INIS)

    1974-01-01

    The invention relates to a surface probe for Eddy current inspection devices. According to the invention, said probe comprises two magnetic core windings, with their axes in parallel relationship and at right angles to the surface of the part to be inspected. This can be applied to the nondestructive inspection of reactor components [fr

  6. Savannah River Plant waste tank inspection manual

    International Nuclear Information System (INIS)

    McNatt, F.G.

    1979-01-01

    This manual is to aid in making visual and photographic inspections and steel thickness measurements of Building 241-F and -H underground waste storage tanks. It describes the inspection program, the storage tanks, the equipment and techniques used and the results of their application, and the inspection recordkeeping methods

  7. 10 CFR 21.41 - Inspections.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Inspections. 21.41 Section 21.41 Energy NUCLEAR REGULATORY COMMISSION REPORTING OF DEFECTS AND NONCOMPLIANCE Inspections, Records § 21.41 Inspections. Each individual, corporation, partnership, dedicating entity, or other entity subject to the regulations in this part shall...

  8. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1994-04-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organizations during the period form January 1994 through March 1994. A list of selected bulletins and information notices involving vendor issues and copies of pertinent correspondence involving vendor issues are also included in this periodical

  9. Airplane tire inspection by image processing techniques

    OpenAIRE

    Jovancevic , Igor; Arafat , Al; Orteu , Jean-José; Sentenac , Thierry

    2016-01-01

    International audience; In this paper, we propose a new approach to detect and inspect airplane tires. We use normalized correlation based template matching to detect tires and GrabCut segmentation method to extract them from the background. We inspect the tires condition by investigating the tire treads. Ridge based intensity profiling gives satisfying inspection results.

  10. Generator acceptance test and inspection report

    International Nuclear Information System (INIS)

    Johns, B.R.

    1997-01-01

    This Acceptance Test Report(ATR) is the completed testing and inspection of the new portable generator. The testing and inspection is to verify that the generator provided by the vendor meets the requirements of specification WHC-S-0252, Revision 2. Attached is various other documentation to support the inspection and testing

  11. 42 CFR 456.602 - Inspection team.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Inspection team. 456.602 Section 456.602 Public... Institutions for Mental Diseases § 456.602 Inspection team. (a) A team, as described in this section and § 456... team conducting periodic inspections must have a least one member who is at physician or registered...

  12. Boresonic inspection of power plant rotors

    International Nuclear Information System (INIS)

    Rennie, I.S.

    1990-01-01

    Continental Field Machining and NEI Parsons together are able to provide an on site machining and boresonic inspection service. NEI Parsons existing boresonic equipment is described together with a summary of results obtained during the inspection of eighty rotors. A computer controlled automatic inspection system, planned to be in operation early in 1990, is also described

  13. Mechanized ultrasonic inspection of austenitic pipe systems

    International Nuclear Information System (INIS)

    Dressler, K.; Luecking, J.; Medenbach, S.

    1999-01-01

    The contribution explains the system of standard testing methods elaborated by ABB ZAQ GmbH for inspection of austenitic plant components. The inspection tasks explained in greater detail are basic materials testing (straight pipes, bends, and pipe specials), and inspection of welds and dissimilar welds. The techniques discussed in detail are those for detection and sizing of defects. (orig./CB) [de

  14. Eddy current technology for heat exchanger and steam generator tube inspection

    Energy Technology Data Exchange (ETDEWEB)

    Obrutsky, L.; Lepine, B.; Lu, J.; Cassidy, R.; Carter, J. [Atomic Energy of Canada Limited, Chalk River, Ontario (Canada)

    2004-07-01

    A variety of degradation modes can affect the integrity of both heat exchanger (HX) and balance of plant tubing, resulting in expensive repairs, tube plugging or replacement of tube bundles. One key component for ensuring tube integrity is inspection and monitoring for detection and characterization of the degradation. In-service inspection of HX and balance of plant tubing is usually carried out using eddy current (EC) bobbin coils, which are adequate for the detection of volumetric degradations. However, detection and quantification of additional modes of degradation such as pitting, intergranular attack (IGA), axial cracking and circumferential cracking require specialized probes. The need for timely, reliable detection and characterization of these modes of degradation is especially critical in Nuclear Generating Stations. Transmit-receive single-pass array probes, developed by AECL, offer high defect detectability in conjunction with fast and reliable inspection capabilities. They have strong directional properties, permitting probe optimization for circumferential or axial crack detection. Compared to impedance probes, they offer improved performance in the presence of variable lift-off. This EC technology can help resolve critical detection issues at susceptible areas, such as the rolled-joint transitions at the tubesheet, U-bends and tube-support intersections. This paper provides an overview of the operating principles and the capabilities of advanced ET inspection technology available for HX tube inspection. Examples of recent application of this technology in Nuclear Generating Stations (NGSs) are discussed. (author)

  15. Eddy current technology for heat exchanger and steam generator tube inspection

    International Nuclear Information System (INIS)

    Obrutsky, L.; Lepine, B.; Lu, J.; Cassidy, R.; Carter, J.

    2004-01-01

    A variety of degradation modes can affect the integrity of both heat exchanger (HX) and balance of plant tubing, resulting in expensive repairs, tube plugging or replacement of tube bundles. One key component for ensuring tube integrity is inspection and monitoring for detection and characterization of the degradation. In-service inspection of HX and balance of plant tubing is usually carried out using eddy current (EC) bobbin coils, which are adequate for the detection of volumetric degradations. However, detection and quantification of additional modes of degradation such as pitting, intergranular attack (IGA), axial cracking and circumferential cracking require specialized probes. The need for timely, reliable detection and characterization of these modes of degradation is especially critical in Nuclear Generating Stations. Transmit-receive single-pass array probes, developed by AECL, offer high defect detectability in conjunction with fast and reliable inspection capabilities. They have strong directional properties, permitting probe optimization for circumferential or axial crack detection. Compared to impedance probes, they offer improved performance in the presence of variable lift-off. This EC technology can help resolve critical detection issues at susceptible areas, such as the rolled-joint transitions at the tubesheet, U-bends and tube-support intersections. This paper provides an overview of the operating principles and the capabilities of advanced ET inspection technology available for HX tube inspection. Examples of recent application of this technology in Nuclear Generating Stations (NGSs) are discussed. (author)

  16. Hydrogen Fuelling Stations

    DEFF Research Database (Denmark)

    Rothuizen, Erasmus Damgaard

    . A system consisting of one high pressure storage tank is used to investigate the thermodynamics of fuelling a hydrogen vehicle. The results show that the decisive parameter for how the fuelling proceeds is the pressure loss in the vehicle. The single tank fuelling system is compared to a cascade fuelling......This thesis concerns hydrogen fuelling stations from an overall system perspective. The study investigates thermodynamics and energy consumption of hydrogen fuelling stations for fuelling vehicles for personal transportation. For the study a library concerning the components in a hydrogen fuelling...... station has been developed in Dymola. The models include the fuelling protocol (J2601) for hydrogen vehicles made by Society of Automotive Engineers (SAE) and the thermodynamic property library CoolProp is used for retrieving state point. The components in the hydrogen fuelling library are building up...

  17. Hydrogen vehicle fueling station

    Energy Technology Data Exchange (ETDEWEB)

    Daney, D.E.; Edeskuty, F.J.; Daugherty, M.A. [Los Alamos National Lab., NM (United States)] [and others

    1995-09-01

    Hydrogen fueling stations are an essential element in the practical application of hydrogen as a vehicle fuel, and a number of issues such as safety, efficiency, design, and operating procedures can only be accurately addressed by a practical demonstration. Regardless of whether the vehicle is powered by an internal combustion engine or fuel cell, or whether the vehicle has a liquid or gaseous fuel tank, the fueling station is a critical technology which is the link between the local storage facility and the vehicle. Because most merchant hydrogen delivered in the US today (and in the near future) is in liquid form due to the overall economics of production and delivery, we believe a practical refueling station should be designed to receive liquid. Systems studies confirm this assumption for stations fueling up to about 300 vehicles. Our fueling station, aimed at refueling fleet vehicles, will receive hydrogen as a liquid and dispense it as either liquid, high pressure gas, or low pressure gas. Thus, it can refuel any of the three types of tanks proposed for hydrogen-powered vehicles -- liquid, gaseous, or hydride. The paper discusses the fueling station design. Results of a numerical model of liquid hydrogen vehicle tank filling, with emphasis on no vent filling, are presented to illustrate the usefulness of the model as a design tool. Results of our vehicle performance model illustrate our thesis that it is too early to judge what the preferred method of on-board vehicle fuel storage will be in practice -- thus our decision to accommodate all three methods.

  18. Improvements in the UT Inspection of vessel nozzles. Array application

    International Nuclear Information System (INIS)

    Tanarro, A.; Garcia, A.; Izquierdo, J.

    1998-01-01

    Automatic ultrasonic inspection of certain components in nuclear power plants, together with problems related to access of same, result in other difficulties due to the complexity of their geometry and the apparent orientation of possible defects. Array technology, recently developed on the basis of the theoretical principals of phased array technique, has meant that it is now possible to advance in the characterisation, localisation, and sizing of the defects in these components. This has been possible thanks to the discovery of synthetic materials which have allowed us to design and manufacture a new group of ultrasonic transducers. To these we may add new developments in electronics and computer sciences which have facilitated the building of high-powered control systems. This report discusses the work carried out by Tecnatom and Iberdrola in the field of automatic ultrasonic inspection of the vessel nozzles by means of array technology in the BWR at the Cofrentes Nuclear Power Station. The aims of this work were: - To facilitate the detection, characterisation, sizing and positioning of defects - To simplify and improve ultrasonic inspection in order to reduce acquisition times and the cost of same In order to achieve these results the following items were developed: - New array transducers were designed and manufactured - A new data acquisition system was developed - New programs for analysing data and for simulating ultrasonic testing was developed - The results have been validated in mock up. (Author)

  19. Remote repair and inspection technics in Tokai reprocessing plant

    International Nuclear Information System (INIS)

    Koyama, Kenji; Ishibashi, Yuzo; Otani, Yosikuni

    1986-01-01

    Tokai reprocessing plant of Power Reactor and Nuclear Fuel Development Corp. is the only factory in Japan which treats 0.7 t/day of the spent fuel from LWR power stations and recovers remaining uranium and newly produced plutonium. Since the reprocessing plant started the hot test in September, 1977, about eight years have elapsed, and 233 t of spent fuel was treated as of August, 1985. During this period, the development of various remote working techniques have been carried out to cope with the failure of equipment and to strengthen the preventive maintenance of equipment. In this report, the development of the techniques for the remote repair of leaking dissolving tanks and the development of the remote inspection system for confirming the soundness of equipment in cells are described. In nuclear facilities, from the viewpoint of the reduction of radiation exposure accompanying the works under high radiation, labor saving, the increase of capacity factor by shortening the period of repair works, the improvement of safety and reliability of the facilities by perfecting checkup and inspection and so on, it is strongly desired to put robots in practical use for maintenance and inspection. (Kako, I.)

  20. Track type ultrasonic inspection device

    International Nuclear Information System (INIS)

    Kajiyama, Shigeru; Sasaki, Tsukasa; Takahisa, Kazuo.

    1993-01-01

    The present invention concerns an improvement of a scanning device disposed near an object to be inspected such as a nuclear pressure vessel and having an ultrasonic probe, mounted thereon that travel along a running track. Specifically, one of wheel supports on both sides is attached being secured to the scanning device. The other of the supports is capable of fixing and releasing, as well as providing and releasing pressure to and from wheels upon mounting and detachment. This enables to provide a structure capable of pressing the wheels of the running device to the plane of the track and release thereof. Accordingly, it is possible to improve the running performance, reduce the size and weight and shorten the time for mounting and detachment of the running inspection device. (I.S.)

  1. Drum inspection robots: Application development

    International Nuclear Information System (INIS)

    Hazen, F.B.; Warner, R.D.

    1996-01-01

    Throughout the Department of Energy (DOE), drums containing mixed and low level stored waste are inspected, as mandated by the Resource Conservation and Recovery Act (RCRA) and other regulations. The inspections are intended to prevent leaks by finding corrosion long before the drums are breached. The DOE Office of Science and Technology (OST) has sponsored efforts towards the development of robotic drum inspectors. This emerging application for mobile and remote sensing has broad applicability for DOE and commercial waste storage areas. Three full scale robot prototypes have been under development, and another project has prototyped a novel technique to analyze robotically collected drum images. In general, the robots consist of a mobile, self-navigating base vehicle, outfitted with sensor packages so that rust and other corrosion cues can be automatically identified. They promise the potential to lower radiation dose and operator effort required, while improving diligence, consistency, and documentation

  2. Radiographic inspection on offshore platforms

    International Nuclear Information System (INIS)

    Soares, Sergio Damasceno; Sperandio, Augusto Gasparoni

    1994-01-01

    One of the great challenges for non-destructive inspection is on offshore platforms, where safety is a critical issue. Inspection by gammagraphy is practically forbidden on the platform deck due to problems to personnel safety and radiological protection. Ir-192 sources are used and the risk of an accident with loss of radioisotope must be considered. It is unfeasible to use gammagraphy, because in case of an accident the rapid evacuation from the platform would be impossible. This problem does not occur when X-ray equipment is used as the radiation source. The limited practicality and portability of the X-ray equipment have prevented its use as a replacement for the gammagraphy. This paper presents the preliminary tests to see the viable use of radiographic tests with constant potential on offshore platforms. (author). 2 refs., 1 fig., 2 tabs, 3 photos

  3. Working group 8: inspection tools

    Energy Technology Data Exchange (ETDEWEB)

    Billey, Deb; Kania, Richard; Nickle, Randy; Wang, Rick; Westwood, Stephen

    2011-07-01

    This eighth working group of the Banff 2011 conference discussed the inspection tools and techniques used by the upstream and downstream pipeline industry to evaluate pipeline integrity. Special attention was given to the challenges and successes related to in-line inspection (ILI) technology. The background of current dent assessment criteria in B31.8 was presented, including dent definition for ILI vendors and pipeline operators as well as codes (CSA Z662 and B31.8). The workshop described examples of dents and assessments showing inconsistency with current criteria as set out by TCPL and Marathon. This workshop produced a single, industry-wide definition of the dent. It was found that the strain based criteria were more practical because depth based is conservative and may miss shallow occurrences. The creation of joint industry group was proposed to develop strain based criteria for incorporation into CSAZ662 and B31.8.

  4. Refurbishment of Point Lepreau Generating Station

    International Nuclear Information System (INIS)

    Thompson, P.D.; Jaitly, R.; Ichiyen, N.; Petrilli, M.A.

    2004-01-01

    NB Power is planning to conduct an 18-month maintenance outage of the Point Lepreau Generating Station (PLGS) beginning in April 2008. The major activity would be the replacement of all 380 Fuel Channel and Calandria Tube Assemblies and the connecting feeder pipes. This activity is referred to as Retube. NB Power would also take advantage of this outage to conduct a number of repairs, replacements, inspections and upgrades (such as rewinding or replacing the generator, replacement of shutdown system trip computers, replacement of certain valves and expansion joints, inspection of systems not normally accessible, etc). These collective activities are referred to as Refurbishment. This would allow the station to operate for an additional 25 to 30 years. The scope of the project was determined from the outcome of a two-year study involving a detailed condition assessment of the station that examined issues relating to ageing and obsolescence. The majority of the plant components were found to be capable of supporting extended operation without needing replacement or changes. In addition to the condition assessment, a detailed review of Safety and Licensing issues associated with extended operation was performed. This included a review of known regulatory and safety issues, comparison of the station against current codes and standards, and comparison of the station against safety related modifications made to more recent CANDU 6 units. Benefit cost analyses (BCA) were performed to assist the utility in determining which changes were appropriate to include in the project scope. As a Probabilistic Safety Assessment (PSA) for PLGS did not exist at the time, a risk baseline for the station had to be determined for use in the BCA. Extensive dialogue with the Canadian Nuclear Safety Commission staff was also undertaken during this phase. A comprehensive Licensing Framework was produced upon which the CNSC provided feedback to NB Power. This feedback was important in terms of

  5. Space Station Habitability Research

    Science.gov (United States)

    Clearwater, Yvonne A.

    1988-01-01

    The purpose and scope of the Habitability Research Group within the Space Human Factors Office at the NASA/Ames Research Center is described. Both near-term and long-term research objectives in the space human factors program pertaining to the U.S. manned Space Station are introduced. The concept of habitability and its relevancy to the U.S. space program is defined within a historical context. The relationship of habitability research to the optimization of environmental and operational determinants of productivity is discussed. Ongoing habitability research efforts pertaining to living and working on the Space Station are described.

  6. Regulatory inspection of BARC facilities

    International Nuclear Information System (INIS)

    Rajdeep; Jayarajan, K.

    2017-01-01

    Nuclear and radiation facilities are sited, constructed, commissioned, operated and decommissioned, in conformity with the current safety standards and codes. Regulatory bodies follow different means to ensure compliance of the standards for the safety of the personnel, the public and the environment. Regulatory Inspection (RI) is one of the important measures employed by regulatory bodies to obtain the safety status of a facility or project and to verify the fulfilment of the conditions stipulated in the consent

  7. Fuel element box inspection device

    International Nuclear Information System (INIS)

    Ortmayer, R.M.; Pick, W.

    1985-01-01

    The invention concerns a device for inspecting the outer geometry of a long fuel element box by measuring the surface contours over its longitudinal crossection and along its length by sensors. These are kept in a sledge which can be moved along the fuel element guide in a slot guide. The measurement signals reach an evaluation device outside the longitudinal box. (orig./HP) [de

  8. Present status of maintenance in nuclear power stations

    International Nuclear Information System (INIS)

    Fueki, Kensuke

    1982-01-01

    For nuclear power stations, the improvement of the rate of facility utilization is indispensable. As its means, the shortening of regular inspection period, the adoption of long term cycle operation, the shortening of plant shutdown period by the improvement of the reliability of installed equipment and so on are conceivable. In this paper, the maintenance techniques in nuclear power stations which constitute the basis of reliability improvement are explained. In nuclear power stations, the use of nuclear fuel, accordingly the existence of radioactivity are the remarkable features. At the time of an accident, the nuclear reaction in a reactor must be stopped, and the excessive heat must be removed. The radioactivity in nuclear fuel must not be released outside. The regular inspection of once a year is provided by the law, and routine tests are performed during normal operation. The check-up by operators also is a part of the safety measures. For the early detection of abnormality, the diagnosis system is developed, and the maintenance techniques during operation are examined for being taken into the safety test and standard. The improvement of reliability is attempted by the redundancy of systems. The activity of quality assurance, the organization for the maintenance of nuclear power stations and maintenance works, and the measures to raise the rate of operation are reported. (Kako, I.)

  9. Can non-destructive inspection be reliable

    International Nuclear Information System (INIS)

    Silk, M.G.; Stoneham, A.M.; Temple, J.A.G.

    1988-01-01

    The paper on inspection is based on the book ''The reliability of non-destructive inspection: assessing the assessment of structures under stress'' by the present authors (published by Adam Hilger 1987). Emphasis is placed on the reliability of inspection and whether cracks in welds or flaws in components can be detected. The need for non-destructive testing and the historical attitudes to non-destructive testing are outlined, along with the case of failure. Factors influencing reliable inspection are discussed, and defect detection trials involving round robin tests are described. The development of reliable inspection techniques and the costs of reliability and unreliability are also examined. (U.K.)

  10. Inspection technologies -Development of national safeguards technology-

    International Nuclear Information System (INIS)

    Hong, J. S.; Kim, B. K.; Kwack, E. H.

    1996-12-01

    17 facility regulations prepared by nuclear facilities according to the Ministerial Notices were evaluated. Safeguards inspection activities under Safeguards are described. Safeguards inspection equipments and operation manuals to be used for national inspection are also described. Safeguards report are produced and submitted to MOST by using the computerized nuclear material accounting system at state level. National inspection support system are developed to produce the on-site information for domestic inspection. Planning and establishment of policy for nuclear control of nuclear materials, international cooperation for nuclear control, CTBT, strengthening of international safeguards system, and the supply of PWRs to North Korea are also described. (author). 43 tabs., 39 figs

  11. How to share inspection practices internationally?

    International Nuclear Information System (INIS)

    Zerger, B.

    2009-01-01

    ASN strives to share practices with its foreign counterparts in order to develop and adopt best practice worldwide. With regard to inspection practices, the exchanges are made with AEN, in particular within the context of the Working Group on Inspection Practices (WGIP). As well as being very rewarding, the exchanges sometimes come up against marked differences in terms of inspection organisation and even in the meaning given to the inspections. The WGIP endeavors, however, to make inspection practice recommendations that are as functional and feasible as possible. (author)

  12. Phased Array Ultrasonic Inspection of Titanium Forgings

    International Nuclear Information System (INIS)

    Howard, P.; Klaassen, R.; Kurkcu, N.; Barshinger, J.; Chalek, C.; Nieters, E.; Sun, Zongqi; Fromont, F. de

    2007-01-01

    Aerospace forging inspections typically use multiple, subsurface-focused sound beams in combination with digital C-scan image acquisition and display. Traditionally, forging inspections have been implemented using multiple single element, fixed focused transducers. Recent advances in phased array technology have made it possible to perform an equivalent inspection using a single phased array transducer. General Electric has developed a system to perform titanium forging inspection based on medical phased array technology and advanced image processing techniques. The components of that system and system performance for titanium inspection will be discussed

  13. Towards formalization of inspection using petrinets

    International Nuclear Information System (INIS)

    Javed, M.; Naeem, M.; Bahadur, F.; Wahab, A.

    2014-01-01

    Achieving better quality software has always been a challenge for software developers. Inspection is one of the most efficient techniques, which ensure the quality of software during its development. To the best of our knowledge, current inspection techniques are not realized by any formal approach. In this paper, we propose an inspection technique, which is not only backed by the formal mathematical semantics of Petri nets, but also supports inspecting concurrent processes. We also use a case study of an agent based distributed processing system to demonstrate the inspection of concurrent processes. (author)

  14. Inspection device for buried equipment

    International Nuclear Information System (INIS)

    Hanawa, Jun.

    1994-01-01

    In an inspection device for a buried equipment, a rail is suspended at the upper portion of a vessel of a pit-vessel type pump buried in a plant building floor, and a truck movable vertical in the vessel along the rail, and an ultrasonic wave probe contained in the truck and urged to the vessel by an electromagnet are disposed. In addition, an elevator moving vertically along a shaft is disposed, and an arm having the ultrasonic probe disposed at the end portion and driven by a piston are disposed to the elevator. The ultrasonic wave probe moves vertically together with the truck along the rail in the vessel while being urged to the vessel by the electromagnet to inspect and measure the state at the inner and outer surfaces of the vessel. Further, the length of the arm is controlled so as to set a predetermined distance between the ultrasonic wave probe and the vessel. Subsequently, the elevator is moved vertically along a shaft passing through a shaft hole of a mount, and the shaft is rotated thereby enabling to inspect and measure the state of the inner and outer surfaces of the vessel. (N.H.)

  15. Integration of design and inspection

    Science.gov (United States)

    Simmonds, William H.

    1990-08-01

    Developments in advanced computer integrated manufacturing technology, coupled with the emphasis on Total Quality Management, are exposing needs for new techniques to integrate all functions from design through to support of the delivered product. One critical functional area that must be integrated into design is that embracing the measurement, inspection and test activities necessary for validation of the delivered product. This area is being tackled by a collaborative project supported by the UK Government Department of Trade and Industry. The project is aimed at developing techniques for analysing validation needs and for planning validation methods. Within the project an experimental Computer Aided Validation Expert system (CAVE) is being constructed. This operates with a generalised model of the validation process and helps with all design stages: specification of product requirements; analysis of the assurance provided by a proposed design and method of manufacture; development of the inspection and test strategy; and analysis of feedback data. The kernel of the system is a knowledge base containing knowledge of the manufacturing process capabilities and of the available inspection and test facilities. The CAVE system is being integrated into a real life advanced computer integrated manufacturing facility for demonstration and evaluation.

  16. Physical degradation assessment of generator station cables

    International Nuclear Information System (INIS)

    Stonkus, D.J.

    1988-01-01

    Preliminary studies of fossil-fired and nuclear generator station cables indicate that the low voltage PVC insulated cables are in relatively good condition. The insulation is flexible and in the case of nuclear cables can withstand a design basis event after nearly 15 years of service. Cables insulated with styrene butadiene rubber have been found embrittled and cables insulated with SBR should be closely inspected in any plant assurance program. Thermal analysis using oxidative induction technique shows promise to indicate cable insulation degradation. Long term reliability assurance and plant life extension studies are being actively pursued at Ontario Hydro. A major study is currently underway to extend the life of the oldest operating fossil-fuel station, the 8-unit, 2400 MW Lakeview TGS in operation since the 1960s. Plant life assurance programs have been initiated at the 2000 MW Lambton TGS in operation since 1969, and for the oldest operating nuclear plant, Pickering NGS A in operation since the early 1970s. As cables are considered one of the critical components in a generator station due to the extreme difficulty and cost of cable replacement, test programs have been initiated to evaluate the physical degradation of the cables and relate the results to electrical diagnostic tests and to chemical changes. The decommissioning of two small nuclear stations, the 20 MW Nuclear Power Demonstration (NPD) and the 200 MW Douglas Point NGS, which were placed in service in 1962 and 1967 respectively, will provide an opportunity to perform destructive electrical and physical evaluation on field aged cables

  17. Ultrasonic inspections of fuel alignment pins

    International Nuclear Information System (INIS)

    Rathgeb, W.; Schmid, R.

    1994-01-01

    As a remedy to the practical problem of defects in fuel alignment pins made of Inconel X750, an inspection technique has been developed which fully meets the requirements of detecting defects. The newly used fuel alignment pins made of austenite are easy to test and therefore satisfy the necessity of further inspections.For the fuel alignment pins of the upper core structure a safe and fast inspection technique was made available. The inspection sensitivity is high and it is possible to give quantitative directions concerning defect orientation and depth. After the required inspections had been concluded in 1989, a total of 18 inspections were carried out in various national and international nuclear power plants in the following years. During this time more than 6000 fuel alignment pines were examined.For the fuel alignment pins the inspection technique provided could increase the understanding of the defect process. This technique contributed to the development of an adaptive and economical repair strategy. ((orig.))

  18. Intelligent Automated Nuclear Fuel Pellet Inspection System

    International Nuclear Information System (INIS)

    Keyvan, S.

    1999-01-01

    At the present time, nuclear pellet inspection is performed manually using naked eyes for judgment and decisionmaking on accepting or rejecting pellets. This current practice of pellet inspection is tedious and subject to inconsistencies and error. Furthermore, unnecessary re-fabrication of pellets is costly and the presence of low quality pellets in a fuel assembly is unacceptable. To improve the quality control in nuclear fuel fabrication plants, an automated pellet inspection system based on advanced techniques is needed. Such a system addresses the following concerns of the current manual inspection method: (1) the reliability of inspection due to typical human errors, (2) radiation exposure to the workers, and (3) speed of inspection and its economical impact. The goal of this research is to develop an automated nuclear fuel pellet inspection system which is based on pellet video (photographic) images and uses artificial intelligence techniques

  19. Exchange of pressurizer safeguarding system at Biblis nuclear power station

    International Nuclear Information System (INIS)

    Weber, D.; Hofbeck, W.

    1991-01-01

    Valves and piping of the pressurizer safeguarding system are exchanged and reset in such a way that they are suitable not only for discharging steam, but also for discharging a water-steam mixture and hot pressurized water; for the emergency measure of primary depressurization by hand (bleed) in the event of failure of the entire feedwater supply and station black-out, and in the event of operational transients with supposed failure of the reactor scram (ATWS). To achieve this, in addition to the requirements of the pressurizer discharging station, changes have to be made to the valve drive to dominate the water loads. During the 1990 inspection this exchange of the pressurizer discharging station was performed at the Biblis A unit as the first German plant. (orig.) [de

  20. Steam generator maintenance and life management at Embalse Nuclear Station

    International Nuclear Information System (INIS)

    Sainz, R.; Diaz, G.; Sveruga, H.; Ramakrishnan, T.K.; Azeez, S.

    2004-01-01

    The Embalse Nuclear Station has four steam generators (SGs) with inverted vertical U tubes manufactured by Babcock and Wilcox Canada (B and W). These are main components, both from the operative point of view as the heat transfer from the Primary Heat Transport System (PHTS) to the Secondary System, and from the point of view of safety, as they are the part of the PHTS and its radioactive inventory pressure barrier. In addition, they are one of the most important cost-related elements for potential life extensions. Maintenance and inspections are carried out in order to maintain a high availability of the SGs, as they have had a positive impact on the operational availability of the plant, and to reduce the tube failure probabilities, thus minimizing the amount of radioactive effluents and taking care of the condition of the main components in order to enable the plant life management and the planning of the plant life extension. The most relevant maintenance activities performed have been the inspections performed on 100% of the tubes every 3 years. the mechanical cleaning of the inside of the tubes, the sludge removal from the secondary side tubesheet, the divider plate replacement, and the inspection of internals of the secondary side.Thanks to the latter and to the eddy current inspections, the degradation in the U-bend supports was detected early and every effort is being made to repair them shortly. Besides, a life management program has been started covering the entire plant starting with this important component. The Embalse Nuclear Station's SGs show a low percentage of plugged tubes compared to other stations in similar conditions, but they must be monitored continually and systematically if a life extension is intended. (author)

  1. Power station instrumentation

    International Nuclear Information System (INIS)

    Jervis, M.W.

    1993-01-01

    Power stations are characterized by a wide variety of mechanical and electrical plant operating with structures, liquids and gases working at high pressures and temperatures and with large mass flows. The voltages and currents are also the highest that occur in most industries. In order to achieve maximum economy, the plant is operated with relatively small margins from conditions that can cause rapid plant damage, safety implications, and very high financial penalties. In common with other process industries, power stations depend heavily on control and instrumentation. These systems have become particularly significant, in the cost-conscious privatized environment, for providing the means to implement the automation implicit in maintaining safety standards, improving generation efficiency and reducing operating manpower costs. This book is for professional instrumentation engineers who need to known about their use in power stations and power station engineers requiring information about the principles and choice of instrumentation available. There are 8 chapters; chapter 4 on instrumentation for nuclear steam supply systems is indexed separately. (Author)

  2. Shippingport Station Decommissioning Project

    International Nuclear Information System (INIS)

    1989-01-01

    This Topical Report is a synopsis of the decontamination of plant components and structures at the Shippingport Station Decommissioning Project (SSDP). The information is provided as a part of the Technology Transfer Program to document the preparation activities in support of the shipment of radioactive wastes and the unconditional release of the site and structural materials. 1 ref., 16 figs., 4 tabs

  3. Galileo Station Keeping Strategy

    Science.gov (United States)

    Perez-Cambriles, Antonio; Bejar-Romero, Juan Antonio; Aguilar-Taboada, Daniel; Perez-Lopez, Fernando; Navarro, Daniel

    2007-01-01

    This paper presents analyses done for the design and implementation of the Maneuver Planning software of the Galileo Flight Dynamics Facility. The station keeping requirements of the constellation have been analyzed in order to identify the key parameters to be taken into account in the design and implementation of the software.

  4. Designing a Weather Station

    Science.gov (United States)

    Roman, Harry T.

    2012-01-01

    The collection and analysis of weather data is crucial to the location of alternate energy systems like solar and wind. This article presents a design challenge that gives students a chance to design a weather station to collect data in advance of a large wind turbine installation. Data analysis is a crucial part of any science or engineering…

  5. Avoiding Service Station Fraud.

    Science.gov (United States)

    Burton, Grace M.; Burton, John R.

    1982-01-01

    High school students are warned against service station fraud. A problem-solving section is designed to help students calculate consumer costs for various fraudulent transactions. Several ways of reducing fraud or of lessening the chances of problems are noted. (MP)

  6. The Service Station.

    Science.gov (United States)

    Ohio State Univ., Columbus. Center for Vocational and Technical Education.

    The purpose of the teacher's guide is to encourage the primary student to expand his or her awareness of jobs within the community. The role of the service station worker is examined, with emphasis on the goods and services provided. Subject areas for which the materials in this guide have potential are social studies, art, and language. Each set…

  7. Electrostatic pickup station

    CERN Multimedia

    CERN PhotoLab

    1979-01-01

    Electrostatic pickup station, with 4 electrodes, to measure beam position in the horizontal and vertical plane. This type is used in the transfer lines leaving the PS (TT2, TTL2, TT70). See also 8206063, where the electrode shapes are clearly visible.

  8. Point Lepreau generating station

    International Nuclear Information System (INIS)

    Ganong, G.H.D.; Strang, A.E.; Gunter, G.E.; Thompson, T.S.

    Point Lepreau-1 reactor is a 600 MWe generating station expected to be in service by October 1979. New Brunswick is suffering a 'catch up' phenomenon in load growth and needs to decrease dependence on foreign oil. The site is on salt water and extensive study has gone into corrosion control. Project management, financing and scheduling have unique aspects. (E.C.B.)

  9. Mojave Base Station Implementation

    Science.gov (United States)

    Koscielski, C. G.

    1984-01-01

    A 12.2 meter diameter X-Y mount antenna was reconditioned for use by the crustal dynamic project as a fixed base station. System capabilities and characteristics and key performance parameters for subsystems are presented. The implementation is completed.

  10. 46 CFR 167.15-10 - Application for annual inspection.

    Science.gov (United States)

    2010-10-01

    ... NAUTICAL SCHOOL SHIPS Inspections § 167.15-10 Application for annual inspection. Application in writing for the annual inspection of every nautical school ship required to be inspected by law and the... Inspection, at any local Marine Inspection Office, U.S. Coast Guard, where the nautical school ship may be...

  11. 7 CFR 57.925 - Inspection of imported eggs.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Inspection of imported eggs. 57.925 Section 57.925... AGRICULTURAL MARKETING ACT OF 1946 AND THE EGG PRODUCTS INSPECTION ACT (CONTINUED) INSPECTION OF EGGS (EGG PRODUCTS INSPECTION ACT) Regulations Governing the Inspection of Eggs Imports § 57.925 Inspection of...

  12. 46 CFR 107.211 - Original Certificate of Inspection.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Original Certificate of Inspection. 107.211 Section 107... INSPECTION AND CERTIFICATION Inspection and Certification § 107.211 Original Certificate of Inspection. (a) The owner or builder of a unit applies for an inspection for an original Certificate of Inspection by...

  13. Employing innovative techniques to reduce inspection times

    International Nuclear Information System (INIS)

    Heumueller, R.; Guse, G.; Dirauf, F.; Fischer, E.

    1997-01-01

    Shorter inspection periods mean lower revision costs and less tight revision schedules, but must not detract from the quality of inspection findings. This requirement imposes upon the company performing the inspection the need for top achievements both in quality management and in the use of innovative techniques. Flexible equipment systems and inspection techniques adapted to specific purposes are able to reduce inspection times in many inspection jobs. As part of a complete system designed to reduce inspection times, the new Saphir (Siemens Alok Phased Array Integrated Reliable UT-System) inspection equipment system is the core of most of the recent innovations. Being an integrated inspection equipment system, it is able to handle conventional US probes as well as arrays and phased arrays. It is open for further matching to specific inspection and administrative requirements and developments, and it may be incorporated in the network of an integrated system with a database. A technological leap in probe design in the past few years has allowed controllable wave fields to be generated which are in no way inferior to those of conventional probes with fixed angles of incidence. In this way, a number of inspection techniques can be implemented with a single probe. This reduces inspection times, setup and retooling times, and doses. Typical examples already used in practice are the LLT (longitudinal-longitudinal-transverse waves) technique and the integration of inspections for longitudinal and transverse defects in a single run. In the near future, surfaces with complicated curvatures will be inspected by novel modular robot systems consisting of individual modules of linear axes and rotational axes. (orig.) [de

  14. Development of FBR visual inspection technique in sodium

    International Nuclear Information System (INIS)

    Suzuki, T.; Nagai, S.; Shioyama, T.; Sato, M.; Karasawa, H.; Maruyama, F.; Ota, S.; Hida, T.; Kai, M.

    1995-01-01

    Because the reactor vessel of Fast Breeder Reactor is filled with opaque liquid sodium, it is expected to develop an acoustic visual inspection technique in sodium. The acoustic 3 dimensional image processing technique and the elemental parts of the visual inspection equipment in sodium have been developed at the first stage of the in-sodium visual inspection technique development. The cross correlation processing has been applied to improve the S/N ratio in the acoustic echo that are deteriorated by wetting in sodium and the low sensitivity that are also deteriorated by rather smaller diameter to integrate the high density multiple acoustic sensors. The improvement of S/N ratio has been realized by the cross correlation between acoustic echo data that is reflected from the objects and M-series continuous wave that is transmitted from the acoustic transducer. The high speed parallel processing circuits, in which DSPs (Digital Signal Processors) are included, have been developed to realize high speed processing by employing (the circuits connected to) each of sensors in parallel. Synthetic Aperture Focussing Technique (SAFT) has been applied to the acoustic 3-dimensional image processing. The amounts of ellipsoids must be drawn into the 3-dimensional memory to compose the 3-dimensional image by SAFT. Then, a high performance work-station has been employed to deal with enormous data to compose the acoustic 3 dimensional image. Motors and cables, which can be operated under the condition of high-temperature and high-radiation environment, have been developed as the parts of the manipulator which will be used for visual inspection equipment in sodium. A prototype drive mechanism consists of the manipulator with three joints and a scanner with an arrayed acoustic sensors which a sweeps in fan-shape mechanically. The manipulatory type prototype drive mechanism and the signal processing device have been developed and tested, and the acoustic 3-dimensional image of pyramid

  15. Developing the information management system for safeguards national inspection

    International Nuclear Information System (INIS)

    Park, S. J.; Jeon, I.; Park, W. S.; Min, K. S.

    2003-01-01

    The inspection information management system for safeguards national inspection is aimed to do the national safeguards inspection with efficiency, and to decrease the inspector's load to write inspection report by systematizing the inspection jobs and sharing the inspection data. National safeguards inspection is consisted two large jobs. The first is the national safeguards supporting job of managing to support the national inspection mission. The other is the writing a national inspection report after completing the national inspection. Before the developing of inspection information management system, the official tools(spread sheet, word processor) are usually used. But there is problem to share the data, to produce the statistics data. To solve the these problem, we developed the inspection information management system that process the job from initial to final inspection work, and opened user education. This paper explain the procedure of developing the inspection information management system for safeguards national inspection

  16. Developing the information management system for safeguards national inspection

    Energy Technology Data Exchange (ETDEWEB)

    Park, S. J.; Jeon, I.; Park, W. S.; Min, K. S. [KAERI, Taejon (Korea, Republic of)

    2003-10-01

    The inspection information management system for safeguards national inspection is aimed to do the national safeguards inspection with efficiency, and to decrease the inspector's load to write inspection report by systematizing the inspection jobs and sharing the inspection data. National safeguards inspection is consisted two large jobs. The first is the national safeguards supporting job of managing to support the national inspection mission. The other is the writing a national inspection report after completing the national inspection. Before the developing of inspection information management system, the official tools(spread sheet, word processor) are usually used. But there is problem to share the data, to produce the statistics data. To solve the these problem, we developed the inspection information management system that process the job from initial to final inspection work, and opened user education. This paper explain the procedure of developing the inspection information management system for safeguards national inspection.

  17. Inspection logistics planning for multi-stage production systems with applications to semiconductor fabrication lines

    Science.gov (United States)

    Chen, Kyle Dakai

    Since the market for semiconductor products has become more lucrative and competitive, research into improving yields for semiconductor fabrication lines has lately received a tremendous amount of attention. One of the most critical tasks in achieving such yield improvements is to plan the in-line inspection sampling efficiently so that any potential yield problems can be detected early and eliminated quickly. We formulate a multi-stage inspection planning model based on configurations in actual semiconductor fabrication lines, specifically taking into account both the capacity constraint and the congestion effects at the inspection station. We propose a new mixed First-Come-First-Serve (FCFS) and Last-Come-First-Serve (LCFS) discipline for serving the inspection samples to expedite the detection of potential yield problems. Employing this mixed FCFS and LCFS discipline, we derive approximate expressions for the queueing delays in yield problem detection time and develop near-optimal algorithms to obtain the inspection logistics planning policies. We also investigate the queueing performance with this mixed type of service discipline under different assumptions and configurations. In addition, we conduct numerical tests and generate managerial insights based on input data from actual semiconductor fabrication lines. To the best of our knowledge, this research is novel in developing, for the first time in the literature, near-optimal results for inspection logistics planning in multi-stage production systems with congestion effects explicitly considered.

  18. Development of innovative inspection tools for higher reliability of PHWR fuel

    International Nuclear Information System (INIS)

    Kamalesh Kumar, B.; Viswanathan, B.; Laxminarayana, B.; Ganguly, C.

    2003-01-01

    'Full text:' Advent of Computer aided manufacturing systems has led to very high rate of production with greater reliability. The conventional inspection tools and systems, which are often manual based do not complement with output of highly automated production line. In order to overcome the deficiency, a strategic plan was developed for having automated inspection facility for PHWR fuel assembly line. Laser based systems with their inherently high accuracy and quick response times are a favorite for metrology purpose. Non-contact nature of laser-based measurement ensures minimal contamination, low wear and tear and good repeatability. So far two laser-based systems viz. Pellet density measurement systems and triangulation sensors have been developed. Laser based fuel pellet inspection system and PHWR fuel bundle metric station are under development. Machine vision-based systems have been developed to overcome certain limitations when inspection has to be carried out on such a large scale manually. These deficiencies arise from limitations of resolution, accessibility, fatigue and absence of quantification ability. These problems get further compounded in inspection of fuel components because of their relatively small sizes, close tolerances required and the reflective surfaces. PC based vision system has been developed for inspecting components and fuel assemblies. The paper would touch upon the details of the various laser systems and vision systems that have been indigenously developed for PHWR Fuel Metrology and their impact on the assembly production line. (author)

  19. Pre-service baseline inspection using x-probe of Oconee replacement steam generators

    International Nuclear Information System (INIS)

    Addario, M.; Shipp, P.; Davis, K.; Fogal, C.

    2003-01-01

    The eddy current method has been the industry standard for inspecting steam generator tubing for many years and the level of sophistication of coil technology has continued to evolve during that time. State of the art array probe systems now employ multiple sensitivity zones in the probe to better detect and characterize defects in an efficient manner. Owners and regulators of nuclear power plants are interested in the most effective and efficient inspection possible. The ultimate goal has been to meet or exceed new and existing regulatory and design requirements by maximizing the quantity and quality of eddy current data collected while minimizing both the time needed to perform the inspection and the radiation exposure. The X-Probe is an example of this new eddy current array technology. Qualified to detect all types of known defects in steam generator tubing, the technology is comprised of a system of probe, data acquisition instrumentation, computer and human interface software. Recently, Duke Power, along with Babcock and Wilcox Canada and the system developer R/D Tech, collaborated to implement this technology in a first of a kind full scale pre-service inspection of replacement steam generators for Duke Power's Oconee nuclear generating station at Babcock and Wilcox Canada's Cambridge plant. The discussion in this paper will briefly describe the X-Probe technology, describe the system required to perform the inspection, present the general results of the inspection and finally draw some comparative benefit conclusions for both pre-service and in-service applications. (author)

  20. Inspection system of radioactive contamination in foods and its results in Yokohama City

    International Nuclear Information System (INIS)

    Morita, Masahiro

    1993-01-01

    Accompanying the Chernobyl nuclear power plant accident occurred on April 26, 1986, the radioactive contamination of the foods imported from Europe became problems. Consequently, the Ministry of Health and Welfare stipulated the temporary limit of radioactive concentration in imported foods in terms of the total of Cs-134 and Cs-137 at less than 370 becquerel per 1 kg of foods in November, 1986, and the inspection system was tightened. In Yokohama, in view of securing the safety of foods and eliminating the anxiety of citizen, the measuring instruments for radioactivity were installed in the Hygiene Laboratory in 1986 and in the Food Hygiene Inspection Stations in Central Wholesale Market in 1987, and the inspection was begun. So far 720 subjects were inspected, but there was none that exceeds the temporary limit. The period and the method of executing the inspection and the results of nuclide analysis, screening inspection and so on are reported. It was judged that at the present point of time, there is not much influence to the life of citizen. (K.I.)

  1. Hydrogen Filling Station

    Energy Technology Data Exchange (ETDEWEB)

    Boehm, Robert F; Sabacky, Bruce; Anderson II, Everett B; Haberman, David; Al-Hassin, Mowafak; He, Xiaoming; Morriseau, Brian

    2010-02-24

    Hydrogen is an environmentally attractive transportation fuel that has the potential to displace fossil fuels. The Freedom CAR and Freedom FUEL initiatives emphasize the importance of hydrogen as a future transportation fuel. Presently, Las Vegas has one hydrogen fueling station powered by natural gas. However, the use of traditional sources of energy to produce hydrogen does not maximize the benefit. The hydrogen fueling station developed under this grant used electrolysis units and solar energy to produce hydrogen fuel. Water and electricity are furnished to the unit and the output is hydrogen and oxygen. Three vehicles were converted to utilize the hydrogen produced at the station. The vehicles were all equipped with different types of technologies. The vehicles were used in the day-to-day operation of the Las Vegas Valley Water District and monitoring was performed on efficiency, reliability and maintenance requirements. The research and demonstration utilized for the reconfiguration of these vehicles could lead to new technologies in vehicle development that could make hydrogen-fueled vehicles more cost effective, economical, efficient and more widely used. In order to advance the development of a hydrogen future in Southern Nevada, project partners recognized a need to bring various entities involved in hydrogen development and deployment together as a means of sharing knowledge and eliminating duplication of efforts. A road-mapping session was held in Las Vegas in June 2006. The Nevada State Energy Office, representatives from DOE, DOE contractors and LANL, NETL, NREL were present. Leadership from the National hydrogen Association Board of Directors also attended. As a result of this session, a roadmap for hydrogen development was created. This roadmap has the ability to become a tool for use by other road-mapping efforts in the hydrogen community. It could also become a standard template for other states or even countries to approach planning for a hydrogen

  2. Bridging of inspection with corrosion management

    International Nuclear Information System (INIS)

    Zamaluddin Ali; Mohd Hawari Hassan; Rohana Jaafar

    2009-01-01

    Formerly, Inspection and Corrosion Engineers have less interaction and sharing of information to each other even they are working in the same plant or organization. Inspection finding either from visual inspection or NDT techniques rarely shared with corrosion engineers. Similarly corrosion engineers rarely discussed their corrosion prediction and potential damage mechanism with inspection engineers. A demanding request of more holistic plant safety and asset integrity promoted the introduction and implementation of Risk Based Inspection (RBI). RBI analysis demands the input mainly from both disciplines i.e. Inspection and Corrosion Engineers. Most of RBI methodologies are once-off analysis approach which also promoted once-off interaction between Inspection and Corrosion Engineers. PETRONAS has developed a methodology with supporting software, integrating both Inspection and Corrosion disciplines. PETRONAS Risk Based Inspection (PRBI) is intended to promote continuous integration of Inspection and Corrosion management of the plant through out the whole life cycle starting from the design stage to fabrication, operation and decommissions stage. (author)

  3. Wafer plane inspection for advanced reticle defects

    Science.gov (United States)

    Nagpal, Rajesh; Ghadiali, Firoz; Kim, Jun; Huang, Tracy; Pang, Song

    2008-05-01

    Readiness of new mask defect inspection technology is one of the key enablers for insertion & transition of the next generation technology from development into production. High volume production in mask shops and wafer fabs demands a reticle inspection system with superior sensitivity complemented by a low false defect rate to ensure fast turnaround of reticle repair and defect disposition (W. Chou et al 2007). Wafer Plane Inspection (WPI) is a novel approach to mask defect inspection, complementing the high resolution inspection capabilities of the TeraScanHR defect inspection system. WPI is accomplished by using the high resolution mask images to construct a physical mask model (D. Pettibone et al 1999). This mask model is then used to create the mask image in the wafer aerial plane. A threshold model is applied to enhance the inspectability of printing defects. WPI can eliminate the mask restrictions imposed on OPC solutions by inspection tool limitations in the past. Historically, minimum image restrictions were required to avoid nuisance inspection stops and/or subsequent loss of sensitivity to defects. WPI has the potential to eliminate these limitations by moving the mask defect inspections to the wafer plane. This paper outlines Wafer Plane Inspection technology, and explores the application of this technology to advanced reticle inspection. A total of twelve representative critical layers were inspected using WPI die-to-die mode. The results from scanning these advanced reticles have shown that applying WPI with a pixel size of 90nm (WPI P90) captures all the defects of interest (DOI) with low false defect detection rates. In validating CD predictions, the delta CDs from WPI are compared against Aerial Imaging Measurement System (AIMS), where a good correlation is established between WPI and AIMSTM.

  4. Mobile environmental radiation monitoring station

    International Nuclear Information System (INIS)

    Assido, H.; Shemesh, Y.; Mazor, T.; Tal, N.; Barak, D.

    1997-01-01

    A mobile environmental radiation monitoring station has been developed and established for the Israeli Ministry of Environment. The radiation monitoring station is ready for immediate placing in any required location, or can be operated from a vehicle. The station collects data Tom the detector and transfers it via cellular communication network to a Computerized Control Center for data storage, processing, and display . The mobile station is fully controlled from the. Routinely, the mobile station responses to the data request accumulated since the last communication session. In case of fault or alarm condition in the mobile station, a local claim is activated and immediately initiates communication with the via cellular communication network. (authors)

  5. Turbine rotors inspection problems associated with independent inspection

    International Nuclear Information System (INIS)

    Delgado, J.O.; Martinez, C.A.

    1990-01-01

    As is well know, the serious problems affecting turbine-generator set rotors and moving parts, such as stress-corrosion cracking and/or the phenomena of creep/fatigue, have led the companies possessing these components to make considerable investments in terms of economy and human resources with a view to finding means for control and solutions. The fact that certain countries, such as Spain, have a limited number of fossil-fuelled and/or nuclear plants, with different suppliers and designs, means that the control and solving of such problems necessarily imply significant technological dependence and, consequently, that the resources used imply high associated costs that is most cases have to be paid in overseas currencies. This fact led several Spanish plant owners to propose that Tecnatom carry out an R ampersand D project aimed at developing and integral turbine rotor inspection and evaluation system designed to reduce technological dependence in this area through the application of in-house technology. This project identified as PC-850059 has been subsidized by the Spanish authorities through The Interministerial Commission of Science ampersand Technology. This article describes the developments achieved and the difficulties inherent to independent turbine rotor inspection and evaluation

  6. Inspection maintenance and planning of shutdown in thermal electric generating plants

    International Nuclear Information System (INIS)

    Dezordi, W.L.; Correa, D.A.; Kina, M.

    1984-01-01

    The schedule shutdown of an industrial plant and, more specifically, of an electrical generating station, is becoming increasingly important. The major parameters to be taken into account for the planning of such a shutdown are basically of economic-financial nature such as costs of the related services (materials, equipment, manpower, etc), loss of revenue caused by the station's shutdown as well as by the station availability, and other requirements expected from it by the Load Dispatch and consumers. Improving the equipment's performances and the station's availability are the fundamental objectives to be strived for. The authors present in this paper, in an abridged form, the planning tools used for thermal electric generating plants shutdowns for inspections, maintenance and design changes implementation. (Author) [pt

  7. Mobile inspection and repackaging unit

    International Nuclear Information System (INIS)

    Whitney, G.A.; Roberts, R.J.

    1992-12-01

    Storage of large volumes of radioactive mixed waste (RMW) and transuranic waste generated over the past 20 years at the Hanford Site has resulted in various waste management challenges. Presently disposal capacity for this waste type does not exist. The waste wail be stored until processing facilities can be completed to provide treatment and final disposed. Because of the complexity of these wastes, special projects have been initiated to properly manage them. This paper addresses one such project. The goal of this project is to develop a mobile solid waste inspection and repackaging facility for solid RMW and transuranic waste

  8. Instant Adobe Edge Inspect starter

    CERN Document Server

    Khan, Joseph

    2013-01-01

    Get to grips with a new technology, understand what it is and what it can do for you, and then get to work with the most important features and tasks. This easy-to-understand Starter guide will get you up to speed with Adobe Edge Inspect quickly and with little effort.This book is for frontend web developers and designers who are developing and testing web applications targeted for mobile browsers. It's assumed that you have a basic understanding of creating web applications using HTML, CSS, and JavaScript, as well as being familiar with running web pages from local HTTP servers. Readers are a

  9. RPII Inspection and Licensing Activities and Annual Inspection Programme for 2013

    International Nuclear Information System (INIS)

    2013-04-01

    The objective of this report is to provide an overview of inspection activities of the Radiological Protection Institute of Ireland RPII, to examine the evolution in licensee numbers and to outline the rationale in developing annual inspection programmes. All inspection activities are now carried out within the framework of a quality management system including inspection planning, the training of inspectors, the conduct of inspections as well as post inspection follow up and review. This report also provides an overview of the main features of the quality system

  10. RPII Inspection and Licensing Activities and Annual Inspection Programme for 2011

    International Nuclear Information System (INIS)

    2010-07-01

    The objective of this report is to provide an overview of inspection activities of the Radiological Protection Institute of Ireland, to examine the evolution in licensee numbers and to outline the rationale in developing annual inspection programmes. All inspection activities are now carried out within the framework of a quality management system including: inspection planning, the training of inspectors, the conduct of inspections as well as inspection follow up and review. The report also provides an overview of the main features of the quality system

  11. Oconee Nuclear Station, Units 1, 2, and 3. Semiannual operating report, January--June 1975

    International Nuclear Information System (INIS)

    1975-01-01

    Information is presented concerning operations, performance characteristics, changes, tests, inspections, containment leak tests, maintenance, primary coolant chemistry, station staff changes, reservoir investigations, plume mapping, and operational environmental radioactivity monitoring data for oconee Units 1, 2, and 3. The non-radiological environmental surveillance program is also described. (FS)

  12. 9 CFR 89.2 - Two or more feedings at same station.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Two or more feedings at same station. 89.2 Section 89.2 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE INTERSTATE TRANSPORTATION OF ANIMALS (INCLUDING POULTRY) AND ANIMAL PRODUCTS STATEMENT...

  13. 18 CFR 1304.403 - Marina sewage pump-out stations and holding tanks.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Marina sewage pump-out... OTHER ALTERATIONS Miscellaneous § 1304.403 Marina sewage pump-out stations and holding tanks. All pump... purposes of inspection; (i) Spill-proof features adequate for transfer of sewage from all movable floating...

  14. Battery charging stations

    Energy Technology Data Exchange (ETDEWEB)

    Bergey, M.

    1997-12-01

    This paper discusses the concept of battery charging stations (BCSs), designed to service rural owners of battery power sources. Many such power sources now are transported to urban areas for recharging. A BCS provides the opportunity to locate these facilities closer to the user, is often powered by renewable sources, or hybrid systems, takes advantage of economies of scale, and has the potential to provide lower cost of service, better service, and better cost recovery than other rural electrification programs. Typical systems discussed can service 200 to 1200 people, and consist of stations powered by photovoltaics, wind/PV, wind/diesel, or diesel only. Examples of installed systems are presented, followed by cost figures, economic analysis, and typical system design and performance numbers.

  15. Development of heavy load carrying vehicle for nuclear power station

    International Nuclear Information System (INIS)

    Terabayashi, Yasuharu; Oono, Hiroo; Aizu, Takao; Kawaguchi, Kaname; Yamanaka, Masayuki; Hirobe, Tamio; Inagaki, Yoshiaki.

    1985-01-01

    In nuclear power stations, in order to carry out sound and stable operation, the routine inspection and regular inspection of machinery and equipment are performed, therefore, the transportation of heavy things is frequently carried out. Especially, the transportation of heavy things over the steps of passages and stairs requires much labor. Therefore, Chubu Electric Power Co., Inc. and Chubu Plant Service Co., Ltd. carried out the research on the development of a vehicle for transporting heavy components of nuclear power plants. In this research, it was aimed at developing a vehicle which can carry heavy components and get over a step, climb and descend stairs, and run through a narrow passage having many curves as well as running on flat ground. For this purpose, the actual state of the transportation of heavy things was investigated during the regular inspection of a nuclear power station, and on the basis of this results, a prototype vehicle was made and tested. Thereafter, a transporting vehicle of actual scale was made and tested. The investigation of actual state and the examination of the fundamental concept, the design, trial manufacture and verifying test are reported. (Kako, I.)

  16. The nuclear power station

    International Nuclear Information System (INIS)

    Plettner, B.

    1987-04-01

    The processes taking place in a nuclear power plant and the dangers arising from a nuclear power station are described. The means and methods of controlling, monitoring, and protecting the plant and things that can go wrong are presented. There is also a short discourse on the research carried out in the USA and Germany, aimed at assessing the risks of utilising nuclear energy by means of the incident tree analysis and probability calculations. (DG) [de

  17. International Space Station exhibit

    Science.gov (United States)

    2000-01-01

    The International Space Station (ISS) exhibit in StenniSphere at John C. Stennis Space Center in Hancock County, Miss., gives visitors an up-close look at the largest international peacetime project in history. Step inside a module of the ISS and glimpse how astronauts will live and work in space. Currently, 16 countries contribute resources and hardware to the ISS. When complete, the orbiting research facility will be larger than a football field.

  18. Shippingport station communications program

    International Nuclear Information System (INIS)

    Stote, J.J.

    1988-01-01

    The author discusses how the communications program for the Shippingport Atomic Power Station has a long history. It can be traced as far back as 1953, when the U.S. Atomic Energy Commission (AEC) awarded a contract to Westinghouse Electric to design the nuclear portion of a power plant for electric utility use. During May of the next year, President Eisenhower initiated groundbreaking ceremonies for the construction of the commercial atomic power plant at Shippingport, Pennsylvania

  19. Audit of Wolf Creek Generating Station, Unit 1 technical specifications. Final technical evaluation report

    International Nuclear Information System (INIS)

    Stromberg, H.M.

    1985-07-01

    This document was prepared for the Nuclear Regulatory Commission (NRC) to assist them in determining whether the Wolf Creek Generating Station Unit 1 Technical Specifications (T/S), which govern plant systems configurations and operations, are in conformance with the assumptions of the Final Safety Analysis Report (FSAR) as amended, the requirements of the Safety Evaluation Report (SER) as supplemented, and the Comments and Responses to the Wolf Creek Technical Specification Draft Inspection Report. A comparative audit of the FSAR as amended, the SER as supplemented, and the Draft Inspection Report was performed with the Wolf Creek T/S. Several discrepancies were identified and subsequently resolved through discussions with the cognizant NRC reviewer, NRC staff reviewers and/or utility representatives. The Wolf Creek Generating Station Unit 1 T/S, to the extent reviewed, are in conformance with the FSAR, SER, and Draft Inspection Report

  20. UK regulatory aspects of prestressed concrete pressure vessels for gas-cooled reactor nuclear power stations

    International Nuclear Information System (INIS)

    Watson, P.S.

    1990-01-01

    Safety assessment principles for nuclear power plants and for nuclear chemical plants demand application of best proven techniques, recognised standards, adequacy margins, inspection and maintenance of all the components including prestressed concrete pressure vessels. In service inspection of prestressed concrete pressure vessels includes: concrete surface examination; anchorage inspection; tendon load check; tendon material examination; foundation settlement and tilt; log-term deformation; vessel temperature excursions; coolant loss; top cap deflection. Hartlepool and Heysham 1 power plants prestress shortfall problem is discussed. Main recommendations can be summarised as follows: at all pressure vessel stations prestress systems should be calibrated in a manner which results in all load bearing components being loaded in a representative manner; at all pressure vessel stations load measurements during calibration should be verified by a redundant and diverse system

  1. Obrigheim nuclear power station. Annual report 1987

    International Nuclear Information System (INIS)

    Koerner, C.

    1988-01-01

    The Obrigheim nuclear power station was operated at full load during the year 1987; 7.351 operating hours procuded electrical energy of 2.607 GWh. This is the fifth best annual result during Obrigheim's operating period. Since commissioning in October 1968, 139.310 hours of operation have generated 46.681 GWh (gross) and from test operation in March 1969 until the end of 1987, 138.530 hours of operation have generated 46.569 GWh. This is an availability of power of 81.6% in this period and a time availability of 83.9%. In 1987, the plant was shut down for 1.222 hours for the 18th refueling including testing, inspection and repair work. Apart from refueling, the plant had a good time availability and therefore contributed 5% to the safe, economical and environmentally acceptable electricity supply of the Land Baden-Wuerttemberg. The power station is of great significance to the region, both in terms of power supply and the economy. (orig./HP) [de

  2. System Enhancements for Mechanical Inspection Processes

    Science.gov (United States)

    Hawkins, Myers IV

    2011-01-01

    Quality inspection of parts is a major component to any project that requires hardware implementation. Keeping track of all of the inspection jobs is essential to having a smooth running process. By using HTML, the programming language ColdFusion, and the MySQL database, I created a web-based job management system for the 170 Mechanical Inspection Group that will replace the Microsoft Access based management system. This will improve the ways inspectors and the people awaiting inspection view and keep track of hardware as it is in the inspection process. In the end, the management system should be able to insert jobs into a queue, place jobs in and out of a bonded state, pre-release bonded jobs, and close out inspection jobs.

  3. System for inspection of stacked cargo containers

    Science.gov (United States)

    Derenzo, Stephen [Pinole, CA

    2011-08-16

    The present invention relates to a system for inspection of stacked cargo containers. One embodiment of the invention generally comprises a plurality of stacked cargo containers arranged in rows or tiers, each container having a top, a bottom a first side, a second side, a front end, and a back end; a plurality of spacers arranged in rows or tiers; one or more mobile inspection devices for inspecting the cargo containers, wherein the one or more inspection devices are removeably disposed within the spacers, the inspection means configured to move through the spacers to detect radiation within the containers. The invented system can also be configured to inspect the cargo containers for a variety of other potentially hazardous materials including but not limited to explosive and chemical threats.

  4. Calculation of frequency of optimal inspection in non-notice inspection game

    International Nuclear Information System (INIS)

    Kumakura, Shinichi; Gotoh, Yoshiki; Kikuchi, Masahiro

    2011-01-01

    We consider a non-notice inspection game between an inspection party, who verifies absence of diversion of nuclear materials and misuse of nuclear facility, and a facility operator, who tries them in a nuclear facility. In the game, the payoff for each player, inspection party and facility operator, is composed of various elements (parameters) such as facility type, a type of nuclear material, number of inspection and others. Their payoffs consist of profits and costs (minus profit). Because of random nature by non-notice inspection, its deterrence effect and inspection number could have the potential to affect their payoffs. In this paper, their payoffs taking into consideration of the inspection environment above are represented as a function of inspection number. Then, the optimal number is calculated from a condition on their payoffs for number of inspection. Comparable statics analysis is performed in order to observe the change of inspection number which is equilibrium point by changing these parameters including deterrence effect, because the number derived depends on each parameter within the inspection environment. Based on the analysis results, necessary conditions to reduce the inspection number keeping inspection effect are pointed out. (author)

  5. Emergency Medical Service (EMS) Stations

    Data.gov (United States)

    Kansas Data Access and Support Center — EMS Locations in Kansas The EMS stations dataset consists of any location where emergency medical services (EMS) personnel are stationed or based out of, or where...

  6. Weigh-in-Motion Stations

    Data.gov (United States)

    Department of Homeland Security — The data included in the GIS Traffic Stations Version database have been assimilated from station description files provided by FHWA for Weigh-in-Motion (WIM), and...

  7. Automatic Traffic Recorder (ATR) Stations

    Data.gov (United States)

    Department of Homeland Security — The data included in the GIS Traffic Stations Version database have been assimilated from station description files provided by FHWA for Weigh-in-Motion (WIM), and...

  8. Ultrasonic inspection of austenitic welds

    International Nuclear Information System (INIS)

    Baikie, B.L.; Wagg, A.R.; Whittle, M.J.; Yapp, D.

    1976-01-01

    Optical and X-ray metallography combined with ultrasonic testing by compression waves was used for inspection of stainless steel weld metal produced by three different welding techniques. X-ray diffraction showed that each weld possessed a characteristic fibre textured structure which was shown by optical microscopy to be parallel to columnar grain boundaries. Metallographic evidence suggested that the development of fibre texture is due to the mechanism of competitive growth. From observations made as a result of optical metallographic examination the orientation of the fibre axis could be predicted if the weld geometry and welding procedure were known. Ultrasonic velocity and attenuation measurements as a continuous function of grain orientation, made on cylinders machined from weld samples, showed that attenuation was strongly orientation dependent. It was concluded that the sensitivity of ultrasonic inspection to small defects is unlikely to be as high for austenitic welds as for ferritic even when transmission is improved by modifying the welding procedure to improve the ultrasonic transmission. (U.K.)

  9. China's coal export and inspection

    International Nuclear Information System (INIS)

    Xiaodong Li

    1993-01-01

    With the development of world's business and trade, coal has become a large part of the import and export goods in the international market. The total amount of coal trade has risen a lot. China is rich in coal resources. According to the estimate made by some experts, the reserve which has been explored recently could be exploited hundreds of years. China's output of raw coal has risen a lot during the past forty years. China coal industry has developed rapidly since the 1980s. It is possible for China to become a big coal export country since it has rich resources and increasing output. The paper suggests four steps which must be taken to expand coal exports in China: improve the level of management and administration of coal mines so as to raise the economic benefit; the follow-up production capacity of the present mines must be enhanced rapidly; step up construction of new large-scale mines; and China's coal washing capacity must be improved speedily since the low capacity has seriously influenced the improvement of coal quality. The paper describes the inspection bureaus and companies that have developed to perform inspection of exports in order to guarantee the quality of export coal

  10. Visual inspection. Better than your eyes

    International Nuclear Information System (INIS)

    Jakobs, N.; Baumgartl, R.

    2005-01-01

    Ongoing improvements in the development of camera technologies and manipulator techniques permit an enhanced performance of inspection tasks in nuclear services. In areas of reduced dose rate it's possible to use small size high resolution CCD cameras instead of tube cameras. Underwater inspections may be performed by submarine instead of rigid manipulator systems. This allows the enlargement of inspection areas and the performance at reduced time and personnel dose rate. (author)

  11. Nuclear power plant pressure vessels. Inservice inspections

    International Nuclear Information System (INIS)

    1995-01-01

    The requirements for the planning and reporting of inservice inspections of nuclear power plant pressure vessels are presented. The guide specifically applies to inservice inspections of Safety class 1 and 2 nuclear power plant pressure vessels, piping, pumps and valves plus their supports and reactor pressure vessel internals by non- destructive examination methods (NDE). Inservice inspections according to the Pressure Vessel Degree (549/73) are discussed separately in the guide YVL 3.0. (4 refs.)

  12. Periodic inspections of the primary system

    International Nuclear Information System (INIS)

    Dufour, L.B.

    1978-01-01

    An impression is given of the inspection techniques, preparations and background for periodic examinations of the primary system of the Dodewaard Nuclear Reactor over the past 10 years. Unfortunately reliable integral inspection techniques to enable 'listening-in' to developing faults, are not yet available. Until they are, inspections will continue to be executed from a distance using different continuous methods, often under water and with a shortage of space and in the presence of ionising radiations. (C.F.)

  13. In-service inspection and periodic testing

    International Nuclear Information System (INIS)

    Eisele, H.; Meyer, F.A.; Zipser, R.R.

    1981-01-01

    In-service inspections are performed to verify the operational safety, and maintenance work is performed to guarantee the availability. Below, the typical in-service inspections of a light-water reactor NPP (operated on a pressurized-water reactor/PWR/ or on a boiling-water reactor/BWR/) are described with details and examples of typical inspections, especially of recurrent performance tests of the systems. (orig./RW)

  14. Modelling inspection policies for building maintenance.

    Science.gov (United States)

    Christer, A H

    1982-08-01

    A method of assessing the potential of an inspection maintenance policy as opposed to an existing breakdown maintenance policy for a building complex is developed. The method is based upon information likely to be available and specific subjective assessments which could be made available. Estimates of the expected number of defects identified at an inspection and the consequential cost saving are presented as functions of the inspection frequency.

  15. In-service inspection and periodic testing

    International Nuclear Information System (INIS)

    Eisele, H.; Meyer, F.A.; Zipser, R.R.

    1980-01-01

    In-service inspections are performed to verify the operational safety, and maintenance work is performed to guarantee the availability. In the present paper, the typical in-service inspections of a light-water reactor NPP (operated on a pressurized-water reactor/PWR/ or on a boiling-water reactor/BWR/) are described with details and examples of typical inspections, especially of recurrent performance tests of the systems. (orig./RW)

  16. Flexible Visual Quality Inspection in Discrete Manufacturing

    OpenAIRE

    Petković, Tomislav; Jurić, Darko; Lončarić, Sven

    2013-01-01

    Most visual quality inspections in discrete manufacturing are composed of length, surface, angle or intensity measurements. Those are implemented as end-user configurable inspection tools that should not require an image processing expert to set up. Currently available software solutions providing such capability use a flowchart based programming environment, but do not fully address an inspection flowchart robustness and can require a redefinition of the flowchart if a small variation is int...

  17. AECL experience in fuel channel inspection

    Energy Technology Data Exchange (ETDEWEB)

    Van Drunen, G. [Atomic Energy of Canada Limited, Chalk River, Ontario (Canada); Gunn, R. [Atomic Energy of Canada Limited, Mississauga, Ontario (Canada); Mayo, W.R. [Atomic Energy of Canada Limited, Chalk River, Ontario (Canada); Scott, D.A. [Atomic Energy of Canada Limited, Mississauga, Ontario (Canada)

    1999-06-01

    Inspection of CANDU fuel channels (FC) is performed to ensure safe and economic reactor operation. CANDU reactor FCs have features that make them a unique non-destructive testing (NDT) challenge. The thin, 4 mm pressure-tube wall means flaws down to about 0.1 mm deep must be reliably detected and characterized. This is one to two orders of magnitude smaller than is usually considered of significant concern for steel piping and pressure vessels. A second unique feature is that inspection sensors must operate in the reactor core--often within 20 cm of highly radioactive fuel. Work on inspection of CANDU reactor FCs at AECL dates back over three decades. In that time, AECL staff have provided equipment and conducted or supervised in-service inspections in about 250 FCs, in addition to over 8000 pre-service FCs. These inspections took place at every existing CANDU reactor except those in India and Romania. Early FC inspections focussed on measurement of changes in dimensions (gauging) resulting from exposure to a combination of neutrons, stress and elevated temperature. Expansion of inspection activities to include volumetric inspection (for flaws) started in the mid-1970s with the discovery of delayed hydride cracking in Pickering 3 and 4 rolled joints. Recognition of other types of flaw mechanisms in the 1980s led to further expansion in both pre-service and in-service inspections. These growing requirements, to meet regulatory as well as economic needs, led to the development of a wide spectrum of inspection technology that now includes tests for hydrogen concentration, structural integrity of core components, flaws, and dimensional change. This paper reviews current CANDU reactor FC inspection requirements. The equipment and techniques developed to satisfy these requirements are also described. The paper concludes with a discussion of work in progress in AECL aimed at providing state-of-the-art FC inspection services. (author)

  18. Remote Visual Testing (RVT) for the diagnostic inspection of feedwater heaters

    International Nuclear Information System (INIS)

    Nugent, M.J.; Pellegrino, B.A.

    1993-01-01

    Feedwater heaters are an important component in the overall plant heat rate, reliability, availability, performance and maintenance considerations at power stations. The ability to diagnose heater problems in-situ properly can lead to: (1) Preventative plugging of damaged, but unfailed tubes; (2) In-place repair procedures; (3) Incorporation of corrective actions into replacement designs or heater/unit operations. The benefits and limitations of Non-Destructive Testing (NDT) on feedwater heaters are briefly reviewed. All Remote Visual Testing (RVT) including borescopes, fiberscopes, videoborescopes and Closed Circuit Television (CCTV) cameras are discussed along with currently accepted formats for documentation. The benefits of a comprehensive in-place inspection involving Remote Visual Testing are discussed in relationship to its diagnostic capabilities. The results of eight post-service heater inspections are discussed along with the root cause of failure of seven unique failure mechanisms. These inspections, including FWH access, RVT tool and data analysis, are detailed. 13 figs

  19. Space Station fluid management logistics

    Science.gov (United States)

    Dominick, Sam M.

    1990-01-01

    Viewgraphs and discussion on space station fluid management logistics are presented. Topics covered include: fluid management logistics - issues for Space Station Freedom evolution; current fluid logistics approach; evolution of Space Station Freedom fluid resupply; launch vehicle evolution; ELV logistics system approach; logistics carrier configuration; expendable fluid/propellant carrier description; fluid carrier design concept; logistics carrier orbital operations; carrier operations at space station; summary/status of orbital fluid transfer techniques; Soviet progress tanker system; and Soviet propellant resupply system observations.

  20. User interface inspection methods a user-centered design method

    CERN Document Server

    Wilson, Chauncey

    2014-01-01

    User Interface Inspection Methods succinctly covers five inspection methods: heuristic evaluation, perspective-based user interface inspection, cognitive walkthrough, pluralistic walkthrough, and formal usability inspections. Heuristic evaluation is perhaps the best-known inspection method, requiring a group of evaluators to review a product against a set of general principles. The perspective-based user interface inspection is based on the principle that different perspectives will find different problems in a user interface. In the related persona-based inspection, colleagues assume the

  1. 10 CFR 76.121 - Inspections.

    Science.gov (United States)

    2010-01-01

    ... shall provide rent-free office space for the exclusive use of Commission inspection personnel upon... provided regular plant employees, following proper identification and compliance with applicable access...

  2. Periodic and in-service inspection programs

    International Nuclear Information System (INIS)

    Dinu, M.

    2000-01-01

    Periodic and in-service inspection programs for Cernavoda NPP consists of periodic inspections of CANDU NPP components CSAN N-285.4 and CSAN N-285.4, in-service inspections and repair and modifications general inspection. Periodic inspection program document (PIPD) determines the systems and components subject to inspection, the category of the inspection, techniques, areas and other details.The current status of the inspection programs is presented, including containment , erosion/corrosion, pressure vessel support and snubbers, main steam lines inspection programs. Qualification program in Cernavoda NPP involves equipment qualification in the on-site laboratory, yearly certification, special equipment qualification in the National Institute of Metrology. All procedures are approved by the ISCIR (regulatory body for pressure vessel and lifting equipment) and CNCAN (National Commission on Nuclear Activities Control). Qualification of the personnel is performed according to the ISCIR Technical prescription CR 11/82 for up to 3 year period. Final qualification and licensing is performed by CNCAN

  3. ENIQ: European Network for Inspection Qualification

    International Nuclear Information System (INIS)

    Champigny, F.; Crutzen, S.; Lemaitre, P.

    1995-01-01

    Many countries are currently considering their own approach to inspection qualification and are carefully assessing experience to date. ENIQ, which stands for European Network for Inspection Qualification, groups the major part of the utilities in Western Europe. The general objective of ENIQ is to coordinate and manage at European level expertise and resources for the assessment and qualification of NDE inspection techniques and procedures, primarily for nuclear components. Also non-nuclear heavy duty components will be considered. Within ENIQ there is a growing consensus of opinion on the general principles of a European approach towards inspection qualification. In this paper the main activities, organization and actual status of ENIQ will be discussed

  4. Non-Destructive Inspection Lab (NDI)

    Data.gov (United States)

    Federal Laboratory Consortium — The NDI specializes in applied research, development and performance of nondestructive inspection procedures (flourescent penetrant, magnetic particle, ultrasonics,...

  5. Development of an automatic reactor inspection system

    International Nuclear Information System (INIS)

    Kim, Jae Hee; Eom, Heung Seop; Lee, Jae Cheol; Choi, Yoo Raek; Moon, Soon Seung

    2002-02-01

    Using recent technologies on a mobile robot computer science, we developed an automatic inspection system for weld lines of the reactor vessel. The ultrasonic inspection of the reactor pressure vessel is currently performed by commercialized robot manipulators. Since, however, the conventional fixed type robot manipulator is very huge, heavy and expensive, it needs long inspection time and is hard to handle and maintain. In order to resolve these problems, we developed a new automatic inspection system using a small mobile robot crawling on the vertical wall of the reactor vessel. According to our conceptual design, we developed the reactor inspection system including an underwater inspection robot, a laser position control subsystem, an ultrasonic data acquisition/analysis subsystem and a main control subsystem. We successfully carried out underwater experiments on the reactor vessel mockup, and real reactor ready for Ulchine nuclear power plant unit 6 at Dusan Heavy Industry in Korea. After this project, we have a plan to commercialize our inspection system. Using this system, we can expect much reduction of the inspection time, performance enhancement, automatic management of inspection history, etc. In the economic point of view, we can also expect import substitution more than 4 million dollars. The established essential technologies for intelligent control and automation are expected to be synthetically applied to the automation of similar systems in nuclear power plants

  6. OSE inspection of computer security: Review

    International Nuclear Information System (INIS)

    Jaehne, E.M.

    1987-01-01

    The inspection process within the Department of Energy (DOE) serves the function of analyzing and reporting on the performance of security measures and controls in specific areas at sites throughout DOE. Three aspects of this process are discussed based on experience in computer security: Policy basis of performance inspections; Role and form of standards and criteria in inspections; and Conducting an inspection using the standards and criteria. Inspections are based on DOE and other applicable policy in each area. These policy statements have a compliance orientation in which the paper trail is often more clearly discernible than the security intention. The relationship of policy to performance inspections is discussed. To facilitate bridging the gap between the paper trail and the security intention defined by policy, standards and criteria were developed in each area. The consensus process and structure of the resulting product for computer security are discussed. Standards and criteria are inspection tools that support the site in preparing for an inspection and the inspector in conducting one. They form a systematic approach that facilitates consistency in the analysis and reporting of inspection results. Experience using the computer security standards and criteria is discussed

  7. Robotic inspection technology-process an toolbox

    Energy Technology Data Exchange (ETDEWEB)

    Hermes, Markus [ROSEN Group (United States). R and D Dept.

    2005-07-01

    Pipeline deterioration grows progressively with ultimate aging of pipeline systems (on-plot and cross country). This includes both, very localized corrosion as well as increasing failure probability due to fatigue cracking. Limiting regular inspecting activities to the 'scrapable' part of the pipelines only, will ultimately result into a pipeline system with questionable integrity. The confidence level in the integrity of these systems will drop below acceptance levels. Inspection of presently un-inspectable sections of the pipeline system becomes a must. This paper provides information on ROSEN's progress on the 'robotic inspection technology' project. The robotic inspection concept developed by ROSEN is based on a modular toolbox principle. This is mandatory. A universal 'all purpose' robot would not be reliable and efficient in resolving the postulated inspection task. A preparatory Quality Function Deployment (QFD) analysis is performed prior to the decision about the adequate robotic solution. This enhances the serviceability and efficiency of the provided technology. The word 'robotic' can be understood in its full meaning of Recognition - Strategy - Motion - Control. Cooperation of different individual systems with an established communication, e.g. utilizing Bluetooth technology, support the robustness of the ROSEN robotic inspection approach. Beside the navigation strategy, the inspection strategy is also part of the QFD process. Multiple inspection technologies combined on a single carrier or distributed across interacting container must be selected with a clear vision of the particular goal. (author)

  8. Quality assurance for IAEA inspection planning

    International Nuclear Information System (INIS)

    Markin, J.T.

    1986-01-01

    Under the provisions of the Treaty on Nonproliferation of Nuclear Weapons and other agreements with states, the International Atomic Energy Agency (IAEA) conducts inspections at nuclear facilities to confirm that their operation is consistent with the peaceful use of nuclear material. The Department of Safeguards at the IAEA is considering a quality assurance program for activities related to the planning of these facility inspections. In this report, we summarize recent work in writing standards for planning inspections at the types of facilities inspected by the IAEA. The standards specify the sequence of steps in planning inspections, which are: (1) administrative functions, such as arrangements for visas and travel, and communications with the state to confirm facility operating schedules and the state's acceptance of the assigned inspectors; (2) technical functions including a specification of the required inspection activities, determination of personnel and equipment resources, and a schedule for implementing the inspection activities at the facility; and (3) management functions, such as pre- and post-inspection briefings, where the planned and implemented inspection activities are reviewed

  9. NRC program of inspection and enforcement

    International Nuclear Information System (INIS)

    LeDoux, J.C.; Rehfuss, C.

    1978-01-01

    The Nuclear Regulatory Commission (NRC) regulates civilian uses of nuclear materials to ensure the protection of the public health and safety and the environment. The Office of Inspection and Enforcement (IE) develops and implements the inspection, investigation, and enforcement programs for the NRC. The IE conducts inspection programs for reactors under construction and in operation, nuclear industry vendors, fuel facilities and users of nuclear materials, and all aspects of the safeguarding of facilities and materials. Recently the IE began implementing a program that will place inspectors on site at nuclear power reactors and will provide for national appraisal of licensee performance and for an evaluation of the effectiveness of the inspection programs

  10. Thermal management of space stations

    Institute of Scientific and Technical Information of China (English)

    2001-01-01

    Thermal management aims at making full use of energy resources available in the space station to reduce energy consumption, waste heat rejection and the weight of the station. It is an extension of the thermal control. This discussion introduces the concept and development of thermal management, presents the aspects of thermal management and further extends its application to subsystems of the space station.

  11. Air and radiation monitoring stations

    CERN Multimedia

    AUTHOR|(SzGeCERN)582709

    2015-01-01

    CERN has around 100 monitoring stations on and around its sites. New radiation measuring stations, capable of detecting even lower levels of radiation, were installed in 2014. Two members of HE-SEE group (Safety Engineering and Environment group) in front of one of the new monitoring stations.

  12. New Swedish regulations in the area of plant inspection and in-service inspection

    International Nuclear Information System (INIS)

    Hansson, B.

    1998-01-01

    History and present status od Swedish regulations in the field of NPP inspection and in-service inspection are described. The presentation focuses on the development of regulations and establishing new ones. A description of different organisations involved is included

  13. Study of the method of placing technical stations

    Directory of Open Access Journals (Sweden)

    Sattorov S.B.

    2017-12-01

    traction arm of the locomotive. When determining the length of the traction arm, the ways of using the locomotive for the duration of working time by one locomotive crew are considered. Practical significance: The rational placement of technical stations according to the proposed methodology will ensure the advancement of trains with the least number of parking lots for the replacement of locomotives, locomotive crews and inspection of rolling stock.

  14. Inspection of training activities by the NRC's Office of Inspection and Enforcement

    International Nuclear Information System (INIS)

    Ruhlman, W.A.

    1975-01-01

    New requirements in the Code of Federal Regulations, the issuance of new Regulatory Guides and ANSI Standards, have indicated the increased emphasis being placed on training by forces in the Nuclear Industry and the Nuclear Regulatory Commission. A brief description is presented of the functions of the Office of Inspection and Enforcement in the training areas. Three areas are examined: general inspection techniques; training inspection scope; and training inspection bases

  15. 78 FR 54861 - Inspection, Repair, and Maintenance; Driver-Vehicle Inspection Report

    Science.gov (United States)

    2013-09-06

    ... No. FMCSA-2012-0336] RIN 2126-AB46 Inspection, Repair, and Maintenance; Driver-Vehicle Inspection... Federal Register of August 7, 2013, regarding driver vehicle inspection reports. The corrections involve..., Vehicle and Roadside Operations Division, Office of Bus and Truck Standards and Operations, Federal Motor...

  16. The interactive on-site inspection system: An information management system to support arms control inspections

    Energy Technology Data Exchange (ETDEWEB)

    DeLand, S.M.; Widney, T.W.; Horak, K.E.; Caudell, R.B.; Grose, E.M.

    1996-12-01

    The increasing use of on-site inspection (OSI) to meet the nation`s obligations with recently signed treaties requires the nation to manage a variety of inspection requirements. This document describes a prototype automated system to assist in the preparation and management of these inspections.

  17. Space station orbit maintenance

    Science.gov (United States)

    Kaplan, D. I.; Jones, R. M.

    1983-01-01

    The orbit maintenance problem is examined for two low-earth-orbiting space station concepts - the large, manned Space Operations Center (SOC) and the smaller, unmanned Science and Applications Space Platform (SASP). Atmospheric drag forces are calculated, and circular orbit altitudes are selected to assure a 90 day decay period in the event of catastrophic propulsion system failure. Several thrusting strategies for orbit maintenance are discussed. Various chemical and electric propulsion systems for orbit maintenance are compared on the basis of propellant resupply requirements, power requirements, Shuttle launch costs, and technology readiness.

  18. Capacity at Railway Stations

    DEFF Research Database (Denmark)

    Landex, Alex

    2011-01-01

    zone(s) the possible conflicts with other trains (also in the opposite direction) are taken into account leading to more trustworthy results. Although the UIC 406 methodology proposes that the railway network should be divided into line sections when trains turn around and when the train order...... is changed, this paper recommends that the railway lines are not always be divided. In case trains turn around on open (single track) line, the capacity consumption may be too low if a railway line is divided. The same can be the case if only few trains are overtaken at an overtaking station. For dead end...

  19. Submerged AUV Charging Station

    Science.gov (United States)

    Jones, Jack A.; Chao, Yi; Curtin, Thomas

    2014-01-01

    Autonomous Underwater Vehicles (AUVs) are becoming increasingly important for military surveillance and mine detection. Most AUVs are battery powered and have limited lifetimes of a few days to a few weeks. This greatly limits the distance that AUVs can travel underwater. Using a series of submerged AUV charging stations, AUVs could travel a limited distance to the next charging station, recharge its batteries, and continue to the next charging station, thus traveling great distances in a relatively short time, similar to the Old West “Pony Express.” One solution is to use temperature differences at various depths in the ocean to produce electricity, which is then stored in a submerged battery. It is preferred to have the upper buoy submerged a reasonable distance below the surface, so as not to be seen from above and not to be inadvertently destroyed by storms or ocean going vessels. In a previous invention, a phase change material (PCM) is melted (expanded) at warm temperatures, for example, 15 °C, and frozen (contracted) at cooler temperatures, for example, 8 °C. Tubes containing the PCM, which could be paraffin such as pentadecane, would be inserted into a container filled with hydraulic oil. When the PCM is melted (expanded), it pushes the oil out into a container that is pressurized to about 3,000 psi (approx equals 20.7 MPa). When a valve is opened, the high-pressure oil passes through a hydraulic motor, which turns a generator and charges a battery. The low-pressure oil is finally reabsorbed into the PCM canister when the PCM tubes are frozen (contracted). Some of the electricity produced could be used to control an external bladder or a motor to the tether line, such that depth cycling is continued for a very long period of time. Alternatively, after the electricity is generated by the hydraulic motor, the exiting low-pressure oil from the hydraulic motor could be vented directly to an external bladder on the AUV, such that filling of the bladder

  20. PlayStation purpura.

    Science.gov (United States)

    Robertson, Susan J; Leonard, Jane; Chamberlain, Alex J

    2010-08-01

    A 16-year-old boy presented with a number of asymptomatic pigmented macules on the volar aspect of his index fingers. Dermoscopy of each macule revealed a parallel ridge pattern of homogenous reddish-brown pigment. We propose that these lesions were induced by repetitive trauma from a Sony PlayStation 3 (Sony Corporation, Tokyo, Japan) vibration feedback controller. The lesions completely resolved following abstinence from gaming over a number of weeks. Although the parallel ridge pattern is typically the hallmark for early acral lentiginous melanoma, it may be observed in a limited number of benign entities, including subcorneal haematoma.

  1. Ultrasonic inspection of austenitic welds

    International Nuclear Information System (INIS)

    Baikie, B.L.; Wagg, A.R.; Whittle, M.J.; Yapp, D.

    1976-01-01

    The ultrasonic examination of austenitic stainless steel weld metal has always been regarded as a difficult proposition because of the large and variable ultrasonic attenuations and back scattering obtained from apparently similar weld deposits. The work to be described shows how the existence of a fibre texture within each weld deposit (as a result of epitaxial growth through successive weld beads) produces a systematic variation in the ultrasonic attenuation coefficient and the velocity of sound, depending upon the angle between the ultrasonic beam and the fibre axis. Development work has shown that it is possible to adjust the welding parameters to ensure that the crystallographic texture within each weld is compatible with improved ultrasonic transmission. The application of the results to the inspection of a specific weld in type 316 weld metal is described

  2. Dielectric inspection of erythrocyte morphology

    International Nuclear Information System (INIS)

    Hayashi, Yoshihito; Oshige, Ikuya; Katsumoto, Yoichi; Omori, Shinji; Yasuda, Akio; Asami, Koji

    2008-01-01

    We performed a systematic study of the sensitivity of dielectric spectroscopy to erythrocyte morphology. Namely, rabbit erythrocytes of four different shapes were prepared by precisely controlling the pH of the suspending medium, and their complex permittivities over the frequency range from 0.1 to 110 MHz were measured and analyzed. Their quantitative analysis shows that the characteristic frequency and the broadening parameter of the dielectric relaxation of interfacial polarization are highly specific to the erythrocyte shape, while they are insensitive to the cell volume fraction. Therefore, these two dielectric parameters can be used to differentiate erythrocytes of different shapes, if dielectric spectroscopy is applied to flow-cytometric inspection of single blood cells. In addition, we revealed the applicability and limitations of the analytical theory of interfacial polarization to explain the experimental permittivities of non-spherical erythrocytes

  3. Dielectric inspection of erythrocyte morphology

    Energy Technology Data Exchange (ETDEWEB)

    Hayashi, Yoshihito; Oshige, Ikuya; Katsumoto, Yoichi; Omori, Shinji; Yasuda, Akio [Life Science Laboratory, Materials Laboratories, Sony Corporation, Sony Bioinformatics Center, Tokyo Medical and Dental University, Bunkyo-ku, Tokyo 113-8510 (Japan); Asami, Koji [Laboratory of Molecular Aggregation Analysis, Division of Multidisciplinary Chemistry, Institute for Chemical Research, Kyoto University, Uji, Kyoto 611-0011 (Japan)], E-mail: Yoshihito.Hayashi@jp.sony.com

    2008-05-21

    We performed a systematic study of the sensitivity of dielectric spectroscopy to erythrocyte morphology. Namely, rabbit erythrocytes of four different shapes were prepared by precisely controlling the pH of the suspending medium, and their complex permittivities over the frequency range from 0.1 to 110 MHz were measured and analyzed. Their quantitative analysis shows that the characteristic frequency and the broadening parameter of the dielectric relaxation of interfacial polarization are highly specific to the erythrocyte shape, while they are insensitive to the cell volume fraction. Therefore, these two dielectric parameters can be used to differentiate erythrocytes of different shapes, if dielectric spectroscopy is applied to flow-cytometric inspection of single blood cells. In addition, we revealed the applicability and limitations of the analytical theory of interfacial polarization to explain the experimental permittivities of non-spherical erythrocytes.

  4. Working session 2: Tubing inspection

    International Nuclear Information System (INIS)

    Guerra, J.; Tapping, R.L.

    1997-01-01

    This session was attended by delegates from 10 countries, and four papers were presented. A wide range of issues was tabled for discussion. Realizing that there was limited time available for more detailed discussion, three topics were chosen for the more detailed discussion: circumferential cracking, performance demonstration (to focus on POD and sizing), and limits of methods. Two other subsessions were organized: one dealt with some challenges related to the robustness of current inspection methods, especially with respect to leaving cracked tubes in service, and the other with developing a chart of current NDE technology with recommendations for future development. These three areas are summarized in turn, along with conclusions and/or recommendations. During the discussions there were four presentations. There were two (Canada, Japan) on eddy current probe developments, both of which addressed multiarray probes that would detect a range of flaws, one (Spain) on circumferential crack detection, and one (JRC, Petten) on the recent PISC III results

  5. Safety inspections to TRIGA reactors

    International Nuclear Information System (INIS)

    Byszewski, W.

    1988-01-01

    The operational safety advisory programme was created to provide useful assistance and advice from an international perspective to research reactor operators and regulators on how to enhance operational safety and radiation protection on their reactors. Safety missions cover not only the operational safety of reactors themselves, but also the safety of associated experimental loops, isotope laboratories and other experimental facilities. Safety missions are also performed on request in other Member States which are interested in receiving impartial advice and assistance in order to enhance the safety of research reactors. The results of the inspections have shown that in some countries there are problems with radiation protection practices and nuclear safety. Very often the Safety Analysis Report is not updated, regulatory supervision needs clarification and improvement, maintenance procedures should be more formalised and records and reports are not maintained properly. In many cases population density around the facility has increased affecting the validity of the original safety analysis

  6. Visual Inspection for Caries Detection

    DEFF Research Database (Denmark)

    Gimenez, T; Piovesan, C; Braga, M M

    2015-01-01

    July 2014 to identify published and nonpublished studies in English. Studies of visual inspection were included that 1) assessed accuracy of the method in detecting caries lesions; 2) were performed on occlusal, proximal, or free smooth surfaces in primary or permanent teeth; 3) had a reference...... (from 5,808 articles initially identified) and 1 abstract (from 168) met the inclusion criteria. In general, the analysis demonstrated that the visual method had good accuracy for detecting caries lesions. Although laboratory and clinical studies have presented similar accuracy, clinically obtained...... caries detection method has good overall performance. Furthermore, although the identified studies had high heterogeneity and risk of bias, the use of detailed and validated indices seems to improve the accuracy of the method....

  7. Tether applications for space station

    Science.gov (United States)

    Nobles, W.

    1986-01-01

    A wide variety of space station applications for tethers were reviewed. Many will affect the operation of the station itself while others are in the category of research or scientific platforms. One of the most expensive aspects of operating the space station will be the continuing shuttle traffic to transport logistic supplies and payloads to the space station. If a means can be found to use tethers to improve the efficiency of that transportation operation, it will increase the operating efficiency of the system and reduce the overall cost of the space station. The concept studied consists of using a tether to lower the shuttle from the space station. This results in a transfer of angular momentum and energy from the orbiter to the space station. The consequences of this transfer is studied and how beneficial use can be made of it.

  8. Modifications to the INSPECT model

    Energy Technology Data Exchange (ETDEWEB)

    Dickinson, S [AEA Technology, Winfrith (United Kingdom); Sims, H E [AEA Technology, Harwell (United Kingdom)

    1996-12-01

    The prediction of iodine behaviour in the containment of a PWR following a loss of coolant accident requires a reliable model of the chemistry of iodine in aqueous solution. The INSPECT model, which was developed several years ago, contains a large number of the relevant chemical reactions of iodine and water radiation chemistry. Since the reactions set was first assembled, however, new data on rate constants and mechanisms have become available. In addition, the application of the model to various small-scale experiments has revealed problems in the modelling of some reactions, leading to an under-prediction of the iodine volatility at high pH, although the experiments have demonstrated that the high pH volatility remains satisfactory low. This paper describes the modifications which have been made to the INSPECT model to take account of new data and to improve the modelling where appropriate. The main changes which have been made to the reaction set are as follows: - The rate constants and activation energies for the reactions describing the radiolysis of water have been updated in with recent assessments, and the temperature dependence of the G value for the primary species have been accordance taken into account, - The mechanism and rates of I{sub 2} hydrolysis have been modified in accordance with the latest assessments of this reaction, - The mechanism for the reaction of I{sub 2} with H{sub 2}O{sub 2} has been changed to a form which produces a more realistic pH dependence under neutral and alkaline conditions, - An addition mechanism for the disproportionation of the O{sub 2} ion has been included, reflecting experimental observations that this reaction has a significant first-order component under all but the purest conditions, - Atomic I is treated as a volatile species, with a partition coefficient of 1.9 at 298 K. (Abstract Truncated)

  9. 78 FR 51728 - Fees for Sanitation Inspections of Cruise Ships

    Science.gov (United States)

    2013-08-21

    ... Sanitation Inspections of Cruise Ships AGENCY: Centers for Disease Control and Prevention (CDC), Department... for vessel sanitation inspections for Fiscal Year (FY) 2014. These inspections are conducted by HHS...-yearly inspections and, when necessary, re-inspection. DATES: These fees are effective October 1, 2013...

  10. 77 FR 12843 - Fees for Sanitation Inspections of Cruise Ships

    Science.gov (United States)

    2012-03-02

    ... Sanitation Inspections of Cruise Ships AGENCY: Centers for Disease Control and Prevention (CDC), Department... diseases. The fee schedule for sanitation inspections of passenger cruise ships inspected under VSP was... sanitation inspections. These inspections are conducted by CDC's Vessel Sanitation Program (VSP). VSP assists...

  11. 7 CFR 927.60 - Inspection and certification.

    Science.gov (United States)

    2010-01-01

    ... WASHINGTON Order Regulating Handling Inspection § 927.60 Inspection and certification. (a) Handlers shall ship only fresh pears inspected by the Federal-State Inspection Service or under a program developed by... 7 Agriculture 8 2010-01-01 2010-01-01 false Inspection and certification. 927.60 Section 927.60...

  12. 9 CFR 307.5 - Overtime and holiday inspection service.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Overtime and holiday inspection... INSPECTION AND CERTIFICATION FACILITIES FOR INSPECTION § 307.5 Overtime and holiday inspection service. (a..., at the rate specified in § 391.3, for the cost of the inspection service furnished on any holiday as...

  13. 9 CFR 590.925 - Inspection of imported egg products.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Inspection of imported egg products... AGRICULTURE EGG PRODUCTS INSPECTION INSPECTION OF EGGS AND EGG PRODUCTS (EGG PRODUCTS INSPECTION ACT) Imports § 590.925 Inspection of imported egg products. (a) Except as provided in § 590.960, egg products offered...

  14. AECB staff annual assessment of the Darlington Nuclear Generating Station for the year 1996

    International Nuclear Information System (INIS)

    1997-06-01

    The Atomic Energy Control Board is the independent federal agency that controls all nuclear activities in Canada. A major use of nuclear energy in Canada is electricity production. The AECB assesses every station's performance against legal requirements, including the conditions in the operating licence. Each station is inspected and all aspects of the station's operation and management is reviewed. This report is the AECB staff assessment of safety at the Darlington Nuclear Generating Station for 1996. Ontario Hydro operated the station in a safe manner in 1996. All four special safety systems were fully available 100 percent of the time. There were more problems that affected the safety support systems in 1996 than in the previous year

  15. Draper Station Analysis Tool

    Science.gov (United States)

    Bedrossian, Nazareth; Jang, Jiann-Woei; McCants, Edward; Omohundro, Zachary; Ring, Tom; Templeton, Jeremy; Zoss, Jeremy; Wallace, Jonathan; Ziegler, Philip

    2011-01-01

    Draper Station Analysis Tool (DSAT) is a computer program, built on commercially available software, for simulating and analyzing complex dynamic systems. Heretofore used in designing and verifying guidance, navigation, and control systems of the International Space Station, DSAT has a modular architecture that lends itself to modification for application to spacecraft or terrestrial systems. DSAT consists of user-interface, data-structures, simulation-generation, analysis, plotting, documentation, and help components. DSAT automates the construction of simulations and the process of analysis. DSAT provides a graphical user interface (GUI), plus a Web-enabled interface, similar to the GUI, that enables a remotely located user to gain access to the full capabilities of DSAT via the Internet and Webbrowser software. Data structures are used to define the GUI, the Web-enabled interface, simulations, and analyses. Three data structures define the type of analysis to be performed: closed-loop simulation, frequency response, and/or stability margins. DSAT can be executed on almost any workstation, desktop, or laptop computer. DSAT provides better than an order of magnitude improvement in cost, schedule, and risk assessment for simulation based design and verification of complex dynamic systems.

  16. Wind turbine power stations

    International Nuclear Information System (INIS)

    Anon.

    1992-11-01

    The Countryside Council for Wales (CCW's) policy on wind turbine power stations needs to be read in the context of CCW's document Energy:Policy and perspectives for the Welsh countryside. This identifies four levels of action aimed at reducing emission of gases which contribute towards the risk of global warming and gases which cause acid deposition. These are: the need for investment in energy efficiency; the need for investment in conventional power generation in order to meet the highest environmental standards; the need for investment in renewable energy; and the need to use land use transportation policies and decisions to ensure energy efficiency and energy conservation. CCW views wind turbine power stations, along with other renewable energy systems, within this framework. CCW's policy is to welcome the exploitation of renewable energy sources as an element in a complete and environmentally sensitive energy policy, subject to the Environmental Assessment of individual schemes and monitoring of the long-term impact of the various technologies involved. (Author)

  17. Safety and Inspection Planning of Older Installations

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard; Ersdal, G.

    2007-01-01

    A basic assumption often made in risk/reliability based inspection planning is that a Bayesian approach can be used. This implies that probabilities of failure can be updated in a consistent way when new information (from inspections and repairs) becomes available. The Bayesian approach and a no-...

  18. Safety and Inspection Planning of Older Installations

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard; Ersdal, G.

    2008-01-01

    A basic assumption often made in risk- and reliability-based inspection planning is that a Bayesian approach can be used. This implies that probabilities of failure can be updated in a consistent way when new information (from inspections and repairs) becomes available. The Bayesian approach and ...

  19. Annual radioactive waste tank inspection program: 1995

    International Nuclear Information System (INIS)

    McNatt, F.G. Sr.

    1996-01-01

    Aqueous radioactive wastes from Savannah River Site (SRS) separations processes are contained in large underground carbon steel tanks. Inspections made during 1995 to evaluate these vessels and evaluations based on data accrued by inspections performed since the tanks were constructed are the subject of this report

  20. 14 CFR 21.615 - FAA inspection.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false FAA inspection. 21.615 Section 21.615 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT CERTIFICATION PROCEDURES FOR PRODUCTS AND PARTS Technical Standard Order Authorizations § 21.615 FAA inspection. Upon the...

  1. Inservice inspection of Halden BWR pressure vessel

    International Nuclear Information System (INIS)

    Foerli, O.; Hernes, T.

    1978-01-01

    A description is given of how the recertification inspection of the 20 years old Halden Reactor pressure vessel was carried out in accordance with the latest ASME-CODES, despite the fact that inspection accessibility was poor. As no volumetric inspection had been carried out since the preservice radiography in 1957, the ultrasonic inspection included the high flux region of all welds. In total 70% of longitudinal welds and 20% of bottom circumferential welds were inspected as well as the bottom nozzle connection. The vessel was not designed with provisions for inservice inspection, the welds are unaccessible from the outside and removal of the lid is virtually impossible. The ultrasonic probes could only be loaded through 77 mm diameter holes in the top lid and remotely positioned inside the vessel. The inspection was performed using 450C and 60OC 1 MHz angle probes and 2.25 MHz normal probes in immersion technique. In a zone around the welds, small regions with lack of bonding between the stainless steel cladding and the boiler steel were revealed. One root defect known and accepted from the preservice radiographs was examined. The defect was found to be 6x30mm as a maximum and well within acceptable limits according to the fracture mechanics analysis method recommended in ASME X1. The inspection required a period of three weeks' work in the reactor hall. (UK)

  2. 23 CFR 650.313 - Inspection procedures.

    Science.gov (United States)

    2010-04-01

    ...) Quality control and quality assurance. Assure systematic quality control (QC) and quality assurance (QA) procedures are used to maintain a high degree of accuracy and consistency in the inspection program. Include... allow assessment of current bridge condition. Record the findings and results of bridge inspections on...

  3. Annual radioactive waste tank inspection program - 1999

    International Nuclear Information System (INIS)

    Moore, C.J.

    2000-01-01

    Aqueous radioactive wastes from Savannah River Site (SRS) separations processes are contained in large underground carbon steel tanks. Inspections made during 1999 to evaluate these vessels and auxiliary appurtenances along with evaluations based on data accrued by inspections performed since the tanks were constructed are the subject of this report

  4. A web environment for inspection service

    International Nuclear Information System (INIS)

    Robles Guemes, N.; Garcia Heras, M.; Cueto-Felgueroso Garcia, C.; Pelaez Gutierrez, J. A.

    2013-01-01

    The in-service inspection fundamental objective is to maintain the structural integrity of structures, systems and components during the life in the installation service. Nuclear power plants are required to implement a Service inspection program in accordance with the established regulation by the Regulatory body.

  5. An intelligent inspection and survey robot

    International Nuclear Information System (INIS)

    Byrd, J.; Holland, J.M.

    1994-01-01

    ARIES (Autonomous Robotic Inspection Experimental System) is a semi-autonomous robotic system intended for use in the automatic inspection of stored containers of low-level nuclear waste. This article describes the technology and how it could be used. 3 refs., 3 figs

  6. Inspections talks with IAEA again broken off

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    North Korea again appears likely to resist more detailed safeguards inspections of its disputed nuclear facilities by the International Atomic Energy Agency. The country's loner status was reinforced during the IAEA General Conference in September, when no other nation joined North Korea in voting against the placement of the inspection issue on the conference's agenda

  7. Risk Based Inspection Planning of Ageing Structures

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard; Ersdal, Gerhard

    2008-01-01

    . Different approaches for updating inspection plans for older installations are considered in order to achieve decreased inspection intervals as the structure are ageing. The most promising method consists in increasing the rate of defects / crack initiation at the end of the expected lifetime. Different...

  8. Ultrasound periodic inspections of reactor pressure vessels

    International Nuclear Information System (INIS)

    Haniger, L.

    1980-01-01

    Two versions are described of ultrasonic equipment for periodic inspections of reactor pressure vessels. One uses the principle of exchangeable programmators with solid-state logic while the other uses programmable logic with semiconductor memories. The equipment is to be used for inspections of welded joints on the upper part of the V-1 reactor pressure vessel. (L.O.)

  9. Developing equipment for AGR remote visual inspection

    International Nuclear Information System (INIS)

    James, P.W.; Walton, P.J.

    1985-01-01

    The Remote Inspection Group is part of the CEGB's Generation Development and Construction Division, and has responsibility for the design, development, procurement, testing and setting to work of the equipment provided to carry out routine remote visual inspections of its AGRs. This equipment includes both the viewing devices and the necessary placement equipment. (author)

  10. Annual radioactive waste tank inspection program - 1992

    International Nuclear Information System (INIS)

    McNatt, F.G.

    1992-01-01

    Aqueous radioactive wastes from Savannah River Site (SRS) separations processes are contained in large underground carbon steel tanks. Inspections made during 1992 to evaluate these vessels and evaluations based on data accrued by inspections made since the tanks were constructed are the subject of this report

  11. Inspection of nuclear fuel transport in Spain

    International Nuclear Information System (INIS)

    Lobo Mendez, J.

    1977-01-01

    The experience acquired in inspecting nuclear fuel shipments carried out in Spain will serve as a basis for establishing the regulations wich must be adhered to for future transports, as the transport of nuclear fuels in Spain will increase considerably within the next years as a result of the Spanish nuclear program. The experience acquired in nuclear fuel transport inspection is described. (author) [es

  12. Annual radioactive waste tank inspection program - 1991

    International Nuclear Information System (INIS)

    McNatt, F.G.

    1992-01-01

    Aqueous radioactive wastes from Savannah River Site (SRS) separations processes are contained in large underground carbon steel tanks. Inspections made during 1991 to evaluate these vessels and evaluations based on data accrued by inspections made since the tanks were constructed are the subject of this report

  13. 7 CFR 330.105 - Inspection.

    Science.gov (United States)

    2010-01-01

    ... inspector notifies the Customs authorities should be held for inspection shall be released by Customs... be handled in accordance with the joint customs and postal regulations for inspecting and handling... of Customs for the release by Customs officers on behalf of the inspector of any class of means of...

  14. Software inspections at Fermilab -- Use and experience

    International Nuclear Information System (INIS)

    Berman, E.F.

    1998-01-01

    Because of the critical nature of DA/Online software it is important to commission software which is correct, usable, reliable, and maintainable, i.e., has the highest quality possible. In order to help meet these goals Fermi National Accelerator Laboratory (Fermilab) has begun implementing a formal software inspection process. Formal Inspections are used to reduce the number of defects in software at as early a stage as possible. These Inspections, in use at a wide variety of institutions (e.g., NASA, Motorola), implement a well-defined procedure that can be used to improve the quality of many different types of deliverables. The inspection process, initially designed by Michael Fagan, will be described as it was developed and as it is currently implemented at Fermilab where it has been used to improve the quality of a variety of different experiment DA/Online software. Benefits of applying inspections at many points in the software life-cycle and benefits to the people involved will be investigated. Experience with many different types of Inspections and the lessons learned about the inspection process itself will be detailed. Finally, the future of Inspections at Fermilab will be given

  15. Developing inspection strategies to support local activities

    DEFF Research Database (Denmark)

    Jensen, Per Langå

    2003-01-01

    An analysis of the Danish development in regulatory praxsis within occupational health and safety with a detailed description of Adapted Inspection.......An analysis of the Danish development in regulatory praxsis within occupational health and safety with a detailed description of Adapted Inspection....

  16. The evidence base for school inspection frameworks

    NARCIS (Netherlands)

    Scheerens, Jaap; Ehren, Melanie Catharina Margaretha

    2015-01-01

    This article describes how Inspectorates of Education operationalize different inspection goals (control, improvement, liaison) in their inspection indicator frameworks. The paper provides an overview and examples of the indicators used across a number of countries and how these are incorporated in

  17. GOES-K solar panel inspection at Astrotech

    Science.gov (United States)

    1997-01-01

    Space Systems/LORAL employees inspect solar panels for the GOES-K weather satellite in the Astrotech facility at Titusville, Fla., as they begin final testing of the imaging system, communications and power systems of the spacecraft. The GOES-K is the third spacecraft to be launched in the new advanced series of geostationary weather satellites for the National Oceanic and Atmospheric Administration (NOAA). The GOES-K is built for NASA and NOAA by Space Systems/LORAL of Palo Alto, Calif. The launch of the satellite from Launch Pad 36B at Cape Canaveral Air Station on an Atlas 1 rocket (AC-79) is currently planned for Apr. 24 at the opening of a launch window which extends from 1:56 to 3:19 a.m. EDT.

  18. Review of progress in magnetic particle inspection

    Science.gov (United States)

    Eisenmann, David J.; Enyart, Darrel; Lo, Chester; Brasche, Lisa

    2014-02-01

    Magnetic particle inspection (MPI) has been widely utilized for decades, and sees considerable use in the aerospace industry with a majority of the steel parts being inspected with MPI at some point in the lifecycle. Typical aircraft locations inspected are landing gear, engine components, attachment hardware, and doors. In spite of its numerous applications the method remains poorly understood, and there are many aspects of that method which would benefit from in-depth study. This shortcoming is due to the fact that MPI combines the complicated nature of electromagnetics, metallurgical material effects, fluid-particle motion dynamics, and physiological human factors into a single inspection. To promote understanding of the intricate method issues that affect sensitivity, or to assist with the revision of industry specifications and standards, research studies will be prioritized through the guidance of a panel of industry experts, using an approach which has worked successfully in the past to guide fluorescent penetrant inspection (FPI) research efforts.

  19. Turning inspection regulations into training tools

    International Nuclear Information System (INIS)

    Finley, D.; Wheatcraft, D.

    1996-01-01

    In response to suggestions from internal and State of California auditors, the Hazardous Waste Management Division (HWM) at Lawrence Livermore National Laboratory prepared an Inspection Schedule and Guidance Document that summarizes the Laboratory's inspection schedule and procedures for waste treatment, storage, and disposal facilities (TSDFs). Because it explains and comments in detail on the inspection schedule, forms, and procedures, this document is a centralized reference for HWM managers and personnel performing TSDF inspections at the Laboratory. It is also a training tool for experienced and new inspectors, standardizing the inspections of personnel with experience and explaining to novices what to look for and why. This poster presentation traces the team effort that created this document and provides specific examples of how the document was developed and how it is used

  20. Advances in technologies for feeder pipe inspections

    Energy Technology Data Exchange (ETDEWEB)

    Ten Grotenhuis, R.; Verma, Y.; Hitchcox, T.; Sakuta, A. [Ontario Power Generation, Inspection and Maintenance Div., Toronto, Ontario (Canada)

    2014-07-15

    The successful development of the Matrix Inspection Technique (MIT) for feeder weld area applications has been followed up with a project to leverage the technology to address other aspects of feeder inspection. The goal of the project is to adapt the technology to provide full circumferential inspection of feeder pipes for FAC thinning and, potentially, for axial cracking. The project necessitated evolving a new generation of high speed, high element count data acquisition instruments. It also required the development of custom inspection arrays, innovative approaches to sealing the water column, use of inertial motion sensors to synthesize encoder inputs, real-time visual feedback for the operator, and enhanced automated analysis software capable of plotting the inspected configuration in 3D. The individual components of the system are currently being integrated into a whole. The results obtained to date demonstrate the approach to be fundamentally sound. (author)

  1. On automatic visual inspection of reflective surfaces

    DEFF Research Database (Denmark)

    Kulmann, Lionel

    1995-01-01

    surfaces, providing new and exciting applications subject to automated visual inspection. Several contextual features have been surveyed along with introduction of novel methods to perform data-dependent enhancement of local surface appearance . Morphological methods have been described and utilized......This thesis descrbes different methods to perform automatic visual inspection of reflective manufactured products, with the aim of increasing productivity, reduce cost and improve the quality level of the production. We investigate two different systems performing automatic visual inspection....... The first is the inspection of highly reflective aluminum sheets, used by the Danish company Bang & Olufsen, as a part of the exterior design and general appearance of their audio and video products. The second is the inspection of IBM hard disk read/write heads for defects during manufacturing. We have...

  2. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1990-10-01

    A fundamental premise of the Nuclear Regulatory Commission's (NRC) licensing and inspection program is that licensees are responsible for the proper construction and safe and efficient operation of their nuclear power plants. The total government-industry system for the inspection of commercial nuclear facilities has been designed to provide for multiple levels of inspection and verification. Licensees, contractors, and vendors each participate in a quality verification process in compliance with requirements prescribed by the NRC's rules and regulations (Title 10 Code of Federal Regulations). The NRC performs an overview of the commercial nuclear industry by inspection to determine whether its requirements are being met by licensees and their contractors, while the major inspection effort is performed by the industry within the framework of ongoing quality verification programs

  3. Noncontacting Optical Measurement And Inspection Systems

    Science.gov (United States)

    Asher, Jeffrey A.; Jackson, Robert L.

    1986-10-01

    Product inspection continues to play a growing role in the improvement of quality and reduction of scrap. Recent emphasis on precision measurements and in-process inspection have been a driving force for the development of noncontacting sensors. Noncontacting sensors can provide long term, unattended use due to the lack of sensor wear. Further, in applications where, sensor contact can damage or geometrically change the part to be measured or inspected, noncontacting sensors are the only technical approach available. MTI is involved in the development and sale of noncontacting sensors and custom inspection systems. This paper will review the recent advances in noncontacting sensor development. Machine vision and fiber optics sensor systems are finding a wide variety of industrial inspection applications. This paper will provide detailed examples of several state-of-the-art applications for these noncontacting sensors.

  4. Development of radioactive materials inspection system

    International Nuclear Information System (INIS)

    Yang Lu; Wang Guobao; Chen Yuhua; Li Latu; Zhang Sujing

    2005-01-01

    Radioactive materials inspection system which is applied to inspect the horror activities of radioactive materials and its illegal transfer. The detector sections are made of highly stable and credible material. It has high sensitivity to radioactive materials. The inspect lowest limit of inspection is the 2-3 times to the background, the energy range is 30 keV-2.5 MeV and the response time is 0.5 s. Inspection message can be transmitted through wired or wireless web to implement remote control. The structure of the system is small, light and convenient. It is ideal for protecting society and public from the harm of the radiation. (authors)

  5. Inspection of Candu Nuclear Reactor Fuel Channels

    International Nuclear Information System (INIS)

    Baron, J.; Jarvis, G.N.; Dolbey, M.P.; Hayter, D.M.

    1986-01-01

    The Channel Inspection and Gauging Apparatus of Reactors (CIGAR) is a fully atomated, remotely operated inspection system designed to perform multi-channel, multi-task inspection of CANDU reactor fuel channels. Ultrasonic techniques are used for flaw detection, (with a sensitivity capable of detecting a 0.075 mm deep notch with a signal to noise ratio of 10 dB) and pressure tube wall thickness and diameter measurements. Eddy currrent systems are used to detect the presence of spacers between the coaxial pressure tube and calandria tube, as well as to measure their relative spacing. A servo-accelerometer is used to estimate the sag of the fuel channels. This advanced inspection system was commissioned and declared in service in September 1985. The paper describes the inspection systems themselves and discussed the results achieved to-date. (author) [pt

  6. A Bayesian analysis of component life expectancy and its implications on the inspection schedule

    International Nuclear Information System (INIS)

    Mason, Paolo

    2017-01-01

    A model of crack initiation and residual component life is fitted to the inspection history, inclusive of two in-service failures, of a set of gas circulator impellers at two UK power stations. The model is then used to estimate the probability of future in-service failure of each item in scenarios in which the next opportunity for inspection (i.e. detection of a developing crack) is exploited or forgone. The study takes into account in exact manner both variability and uncertainty. A novel Approximate Bayesian Computation (ABC) methodology is introduced for the quantification of uncertainty, i.e. the sampling of the posterior distribution of the parameters of the model. At the price of the discretization of this distribution, the methodology represents a quickly implemented option in problems where standard ABC rejection sampling is unacceptably inefficient. - Highlights: • A model of crack initiation and residual component life is introduced. • The model is fitted to the inspection log of a set of gas circulator impellers. • The odds of future failure are computed under different inspection schedules. • This prediction informs the choice to perform or forgo future inspection. • A novel Approximate Bayesian Computation algorithm is introduced and validated.

  7. Simulation in Quality Management – An Approach to Improve Inspection Planning

    Directory of Open Access Journals (Sweden)

    H.-A. Crostack

    2005-01-01

    Full Text Available Production is a multi-step process involving many different articles produced in different jobs by various machining stations. Quality inspection has to be integrated in the production sequence in order to ensure the conformance of the products. The interactions between manufacturing processes and inspections are very complex since three aspects (quality, cost, and time should all be considered at the same time while determining the suitable inspection strategy. Therefore, a simulation approach was introduced to solve this problem.The simulator called QUINTE [the QUINTE simulator has been developed at the University of Dortmund in the course of two research projects funded by the German Federal Ministry of Economics and Labour (BMWA: Bundesministerium für Wirtschaft und Arbeit, the Arbeitsgemeinschaft industrieller Forschungsvereinigungen (AiF, Cologne/Germany and the Forschungsgemeinschaft Qualität, Frankfurt a.M./Germany] was developed to simulate the machining as well as the inspection. It can be used to investigate and evaluate the inspection strategies in manufacturing processes. The investigation into the application of QUINTE simulator in industry was carried out at two pilot companies. The results show the validity of this simulator. An attempt to run QUINTE in a user-friendly environment, i.e., the commercial simulation software – Arena® is also described in this paper.NOTATION: QUINTE Qualität in der Teilefertigung  (Quality in  the manufacturing process  

  8. Risk informed inservice inspection evaluation of the ComEd nuclear plants

    International Nuclear Information System (INIS)

    Fleming, K.N.; Hutchinson, J.J.

    2000-01-01

    In November, 1999 Commonwealth Edison Company began the largest scope project yet performed to implement risk informed in-service inspection programs for piping systems. A contractor team led by ERIN Engineering and Research was selected to perform full scope risk informed evaluations on ten reactor units at five sites including 3 BWR and 2 PWR stations. This risk informed evaluation has applied a number of advancements to RISI technology in key areas including risk quantification of inspection program changes, element selection, treatment of multiple damage mechanisms at a given location, and in streamlining an approach to RISI initially developed by EPRI. The scope of the evaluation covered more than 18,000 ASME Class 1 and 2 welds not counting those that will continue to be inspected as part of augmented programs for flow accelerated corrosion, stress corrosion cracking, and service water systems. When the current ASME Section XI based exams are replaced by the risk informed program, while some new inspection locations will be added, substantial cost savings and person-rem exposures are projected from the elimination of most of the current exams. ComEd expects to recover its investment in the RISI evaluation for each of the 10 reactor units in 1 to 2 refueling outages, from the cost savings of reduced inspections. At the same time, the risk of a severe accident due to pipe ruptures is not expected to exhibit significant changes. (author)

  9. Experience in testing and inspection and maintenance of material handling equipments

    International Nuclear Information System (INIS)

    Sharma, M.L.

    2009-01-01

    All the Industries, Power Projects/Stations, Organizations engaged in the field of process of manufacturing, power generation, transportation, design, layout, manufacturing, and supply have to utilize material handling equipment, machinery tools tackles, lifting gears for performing their tasks/activities. The major role of the material handling equipments play an important role and a component of 40% of the total activities of the system/process to achieve targeted output with the reliability and quality is performed by material handling equipment and machineries. The material handling equipment shall have to be chosen/selected to suit the process requirement at times to be specifically designed inspected and tested to meet the specific requirement. These equipment/machineries/lifting gears have to undergo for the periodical inspection and testing to qualify for further use in a specified period. All those equipment and machinery to be used for material handling if not found satisfactory during inspection and testing or otherwise also shall be dismantled/stripped to the extent of inspection requirement of the components/sub components and maintenance repair shall have to be done to make them worthy for reuse after testing and inspection duly witnessed by competent authority

  10. Brokdorf nuclear power station: Construction scheduling and deadline control

    International Nuclear Information System (INIS)

    Lembcke, U.D.F.

    1986-01-01

    Scheduling, especially deadline control, for all installations of the Brokdorf nuclear power station was carried out centrally by the Project Management of Kraftwerk Union AG. 130 timetables encompassing some 13,000 activities were handled, which were interconnected and linked to 189 timetables (approx. 18,000 activities) from various specialized sections by means of data processing systems. Much space in time scheduling was taken by controls of software processing, especially of the preliminary inspection documents in the piping sector and of working documents for construction management in the control systems area. (orig.) [de

  11. Natural Gas Vehicle Cylinder Safety, Training and Inspection Project

    Energy Technology Data Exchange (ETDEWEB)

    Hank Seiff

    2008-12-31

    Under the auspices of the National Energy Technology Laboratory and the US Department of Energy, the Clean Vehicle Education Foundation conducted a three-year program to increase the understanding of the safe and proper use and maintenance of vehicular compressed natural gas (CNG) fuel systems. High-pressure fuel systems require periodic inspection and maintenance to insure safe and proper operation. The project addressed the needs of CNG fuel containers (cylinders) and associated high-pressure fuel system components related to existing law, codes and standards (C&S), available training and inspection programs, and assured coordination among vehicle users, public safety officials, fueling station operators and training providers. The program included a public and industry awareness campaign, establishment and administration of a cylinder inspector certification training scholarship program, evaluation of current safety training and testing practices, monitoring and investigation of CNG vehicle incidents, evaluation of a cylinder recertification program and the migration of CNG vehicle safety knowledge to the nascent hydrogen vehicle community.

  12. The reliability of ultrasonic inspection and the critical defect size

    International Nuclear Information System (INIS)

    Vasilchenko, G.S.; Bely, V.E.; Ovchinnikov, A.V.; Rivkin, E.Yu.

    1991-01-01

    The ability to detect fabrication and service-induced defects in the welded joints of components and pipelines in nuclear power stations by ultrasonic inspection when this is conducted by using standard instruments and procedures appears to be insufficient. This fact was confirmed by the research carried out in PISC program and other studies. In order to increase the accuracy of measurement and to obtain the additional information on the character of any defect in ultrasonic testing as well as the validity of applying nondestructive testing data to strength calculation, scientific researches have been promoted and carried out in the USSR in a program under the guidance of NPO CNIITMASH. The reliability of the ultrasonic control of welded joints and the ways and means for its improvement are discussed. The presentation of the parameters realized by the ultrasonic inspection of defects in the form of schema for the use in strength calculation is explained. The calculation of stress intensity factor, the estimation of critical defect size, and the estimation of acceptable defect size are reported. (K.I.)

  13. Regulatory inspection of the egyptian gamma irradiator using a proposed inspection checklist

    International Nuclear Information System (INIS)

    Abdel-Ghani, A.H.

    2000-01-01

    Regulatory inspections are one of the most important elements of a regulatory programme. It shall be performed in all areas of the regulatory responsibility and during all phases of siting, design, construction, commissioning, operation, maintenance and decommissioning of an irradiator facility. The egyptian mega gamma irradiator operating since december 1979 has a Co-60 source of about 400 kilo curies and is used mainly for sterilization of medical supplies and pharmaceuticals and for preservation of some food stuffs. The constructor (Nordion international Inc.) recommended an extensive inspection programme. In accordance with the international and national (2.3) regulations as well as the licensing conditions, the competent authority (NCNSRC) shall perform regulatory inspections both announced and unannounced. In order to facilitate the inspection task and to harmonize the inspection reports a checklist for inspection is proposed which can be used also as an inspection report form

  14. How Agencies Inspect. A Comparative Study of Inspection Policies in Eight Swedish Government Agencies

    International Nuclear Information System (INIS)

    Lindblom, Lars; Clausen, Jonas; Edvardsson, Karin; Hayenhielm, Madeleine; Hermansson, Helene; Nihlen, Jessica; Palm, Elin; Ruden, Christina; Wikman, Per; Hansson, Sven Ove

    2003-04-01

    Eight Swedish authorities with inspection tasks in the areas of health, safety, and environmental protection have been compared, namely the authorities responsible for nuclear safety, radiation protection, railway, marine and aviation safety, environmental protection, chemicals control, and health and safety on workplaces. Significant differences in inspection policies and practices between the authorities were found, such as: diverging definitions of supervision and inspection that complicate comparisons, different priority-setting principles for inspections, variations in inspection frequencies (between 13 and 0.03 inspections per company and year), different practices with respect to notifying companies before inspection visits, and in particular, large differences in the extent to which non-compliance with regulations is reported to legal authorities. It was concluded that these agencies have much to gain from increasing their cooperation in methods development, evaluation studies, and education of inspectors

  15. Benchmarking on Inspection Practices. First Triennial Report of the Working Group on Inspection Practices

    International Nuclear Information System (INIS)

    2017-01-01

    The WGIP Nuclear Power Plant (NPP) Observed Inspection Practices Program is intended to promote co-operation and learning among member countries and to collect and provide them with information for improving the effectiveness of existing regulatory inspection practices. This is accomplished by observing how inspections are carried out by other member countries and issuing a WGIP observed inspection report that includes observations (e.g. inspection techniques, obstacles encountered), lessons learnt and potential commendable practices that could be used by a regulatory body. This first triennial report documents the results of a consistency check performed between all six WGIP observed inspection reports and ratifies certain observations, lessons learnt and potential commendable practices identified by WGIP observed inspection participants

  16. Development of nondestructive evaluation techniques for DAM inspection. Progress report, January 1995 through August 1997

    Energy Technology Data Exchange (ETDEWEB)

    Brown, A. E.; Thomas, G.H.

    1997-09-04

    The Lawrence Livermore National Laboratory has concluded a two and a half year study on the development of an ultrasonic inspection system to inspect post stressed steel tendons on dams and flood gates. The inspection systems were part of a program for the California Department of Water Resources. The effort included the identification of the location and amount of corrosion damage to the tendons, identification of the cause of corrosion, and the technology for inhibiting corrosion. Several NDE methods for inspecting and quantifying damage to steel reinforced concrete water pipes were investigated and presented to the DWR for their consideration. The additional methods included Ground Penetrating RADAR, Electro- Potential Measurements, Infrared Technology, Pipe Inspection Crawlers (designed to travel inside pipelines and simultaneously report on the pipe condition as viewed by ultrasonic methods and video cameras from within the pipeline.) Reference to consultants hired by LLNL for similar on-site corrosion inspections were given to the DWR. The LLNL research into industries that have products to prevent corrosion resulted in the identification of an Innsbruck, Austria, company. This company claims to have products to permanently protect post- or pre-stressed tendons. The caveat is that the tendon protection system must be installed when the tendons are installed because no retrofit is available. Corrosion mitigation on the steel reinforcements surrounding the concrete was addressed through active and passive cathodic protection schemes. The combination of corrosion and erosion were addressed during consideration for the inspection of water-pump impeller-blades that are used in the three stage, million horsepower, pumping stations at Edmunston.

  17. Local control stations

    International Nuclear Information System (INIS)

    Brown, W.S.; Higgins, J.C.; Wachtel, J.A.

    1993-01-01

    This paper describes research concerning the effects of human engineering design at local control stations (i.e., operator interfaces located outside the control room) on human performance and plant safety. The research considered both multifunction panels (e.g. remote shutdown panels) as well as single-function interfaces (e.g., valves, breakers, gauges, etc.). Changes in performance shaping factors associated with variations in human engineering at LCSs were estimated based on expert opinion. By means of a scaling procedure, these estimates were used to modify the human error probabilities in a PRA model, which was then employed to generate estimates of plant risk and scoping-level value/impact ratios for various human engineering upgrades. Recent documentation of human engineering deficiencies at single-function LCSs was also reviewed, and an assessment of the current status of LCSs with respect to human engineering was conducted

  18. Innovative Railway Stations

    Science.gov (United States)

    Rzepnicka, Sylwia; Załuski, Daniel

    2017-10-01

    In relation to modern demographic trends, evolving technologies and environment-friendly solutions increases the potential of rail considered as sustainable form of public transport. Contemporary tendencies of designing railway stations in Europe are focused on lowering energy consumption and reducing carbon emission. The main goal of the designers is to create a friendly and intuitive space for its users and at the same time a building that uses renewable energy sources and minimizes negative impact on the environment by the increase of biologically active areas, reuse of rainwater and greywater, innovative heating and cooling solutions and reduction of energy losses. The optimisation of a life circle in railway architecture introduces new approach to passenger service. Examples mentioned in the content of this article help to synthesize changes in approach to the design within the context of sustainability.

  19. Bradwell Nuclear Power Station

    International Nuclear Information System (INIS)

    1987-01-01

    When built, the Magnox reactors were expected to have operating lifetimes of 20-25 years. In order to satisfy the licensing authorities of their continued safety, long term safety reviews (LTSRs) are being carried out as the reactors reach 20 years of operation. This is the Nuclear Installations Inspectorate's (NII) summary report on Bradwell nuclear power station. The objectives of the LTSR are stated. A description of the plant is followed by an explanation of the statutory position on licensing. The responsibilities of the Central Electricity Generating Board (CEGB) and the NII are defined. From the examination of the CEGB's LTSR it is concluded that this generally confirms the validity of the existing safety case for present operation. However, some recommendations are made as to work required for reactor operation up to 1992. A summary of the NII findings is presented. This includes the reactor pressure circuit integrity, effects of ageing and in-service wear and radiation doses. (U.K.)

  20. Integrated microfluidic probe station.

    Science.gov (United States)

    Perrault, C M; Qasaimeh, M A; Brastaviceanu, T; Anderson, K; Kabakibo, Y; Juncker, D

    2010-11-01

    The microfluidic probe (MFP) consists of a flat, blunt tip with two apertures for the injection and reaspiration of a microjet into a solution--thus hydrodynamically confining the microjet--and is operated atop an inverted microscope that enables live imaging. By scanning across a surface, the microjet can be used for surface processing with the capability of both depositing and removing material; as it operates under immersed conditions, sensitive biological materials and living cells can be processed. During scanning, the MFP is kept immobile and centered over the objective of the inverted microscope, a few micrometers above a substrate that is displaced by moving the microscope stage and that is flushed continuously with the microjet. For consistent and reproducible surface processing, the gap between the MFP and the substrate, the MFP's alignment, the scanning speed, the injection and aspiration flow rates, and the image capture need all to be controlled and synchronized. Here, we present an automated MFP station that integrates all of these functionalities and automates the key operational parameters. A custom software program is used to control an independent motorized Z stage for adjusting the gap, a motorized microscope stage for scanning the substrate, up to 16 syringe pumps for injecting and aspirating fluids, and an inverted fluorescence microscope equipped with a charge-coupled device camera. The parallelism between the MFP and the substrate is adjusted using manual goniometer at the beginning of the experiment. The alignment of the injection and aspiration apertures along the scanning axis is performed using a newly designed MFP screw holder. We illustrate the integrated MFP station by the programmed, automated patterning of fluorescently labeled biotin on a streptavidin-coated surface.

  1. Tritium in groundwater investigation at the Pickering Nuclear Generating Station

    International Nuclear Information System (INIS)

    DeWilde, J.; Yu, L.; Wootton, R.; Belanger, D.; Hansen, K.; McGurk, E.; Teare, A.

    2001-01-01

    Ontario Power Generation Inc. (OPG) investigated tritium in groundwater at the Pickering Nuclear Generating Station (PNGS). The objectives of the study were to evaluate and define the extent of radionuclides, primarily tritium, in groundwater, investigate the causes or sources of contamination, determine impacts on the natural environment, and provide recommendations to prevent future discharges. This paper provides an overview of the investigations conducted in 1999 and 2000 to identity the extent of the tritium beneath the site and the potential sources of tritium released to the groundwater. The investigation and findings are summarized with a focus on unique aspects of the investigation, on lessons learned and benefits. Some of the investigative techniques discussed include process assessments, video inspections, hydrostatic and tracer tests, Helium 3 analysis for tritium age dating, deuterium and tritium in soil analysis. The investigative techniques have widespread applications to other nuclear generating stations. (author)

  2. Semi-automated reviewing station for IAEA optical surveillance data

    International Nuclear Information System (INIS)

    Darnell, R.A.; Sonnier, C.S.

    1987-01-01

    A study is underway on the use of computer vision technology to assist in visual inspection of optical surveillance data. The IAEA currently uses optical surveillance as one of its principle Containment and Surveillance (C/S) measures. The review process is a very time-consuming and tedious task, due to the large amount of optical surveillance data to be reviewed. For some time, the IAEA has identified as one of its principle needs an automated optical surveillance data reviewing station that assists the reviewer in identifying activities of safeguards interest, such as the movement of a very large spent fuel cask. The present development reviewing station consists of commercially available digital image processing hardware controlled by a personal computer. The areas under study include change detection, target discrimination, tracking, and classification. Several algorithms are being evaluated in each of these areas using recorded video tape of safeguards relevant scenes. The computer vision techniques and current status of the studies are discussed

  3. Discharges from nuclear power stations

    International Nuclear Information System (INIS)

    1991-02-01

    HM Inspectorate of Pollution commissioned, with authorising responsibilities in England and Wales, a study into the discharges of radioactive effluents from Nuclear Power Stations. The study considered arisings from nuclear power stations in Europe and the USA and the technologies to treat and control the radioactive discharges. This report contains details of the technologies used at many nuclear power stations to treat and control radioactive discharges and gives, where information was available, details of discharges and authorised discharge limits. (author)

  4. Pressure vessel integrity and weld inspection procedure

    International Nuclear Information System (INIS)

    Solomon, K.A.; Okrent, D.; Kastenberg, W.E.

    1975-01-01

    The primary objective of this paper is to develop a simple methodology which, when coupled with existing observations on pressure vessel behavior, provides an inter-relation between pressure vessel integrity, and the parameters of the in-service inspection program, including inspection sample size, frequency and efficiency. A modified Markov process is employed and a computer code was written to obtain numerical results. The Markov process mathematically describes the following physical events. In a nuclear reactor pressure vessel weld, some defects may exist prior to the zeroth inspection (i.e., prior to vessel operation). During the zeroth inspection and repair processes, some of these defects are removed. During the first cycle of vessel operation, the existing defects may grow and some new defects may be generated. Those defects that are found at the first (and succeeding) inspection interval and warrant repair, are repaired. The above process continues through several operating cycles to the end of vessel life. During any inspection, only a portion of the welds may be inspected, and with less than perfect efficiency

  5. Inspection of licensee activities in emergency planning

    International Nuclear Information System (INIS)

    Van Binnebeek, J.J.; Gutierrez Ruiz, Luis Miguel; Bouvrie, E. des; Aro, Ilari; Gil, J.; Balloffet, Yves; Forsberg, Staffan; Klonk, H.; Lang, Hans-Guenter; Fichtinger, G.; Warren, T.; Manzella, P.; Gallo, R.; Koizumi, Hiroyoshi; Johnson, M.; Pittermann, P.

    1998-01-01

    The CNRA believes that safety inspections are a major element in the regulatory authority's efforts to ensure the safe operation of nuclear facilities. Considering the importance of these issues, the Committee has established a special Working Group on Inspection Practices (WGIP). The purpose of WGIP, is to facilitate the exchange of information and experience related to regulatory safety inspections between CNRA Member countries Following discussions at several meetings on the topic of what is expected by the regulatory body regarding inspection criteria, WGIP proposed putting together a compilation of Member countries practices on regulatory inspection practices with respect to licensee emergency planning. CNRA approved this task and this report. Information was collected from a questionnaire which was issued in 1996. The report presents information on regulatory inspection activities with respect to emergency planning in NEA Member countries. The focus of the report is on the third section. It reviews the similarities and differences in inspection practices to evaluate compliance with the requirements over which the regulatory body (RB) has jurisdiction

  6. Travelling type monitoring and inspection device

    International Nuclear Information System (INIS)

    Ito, Takao; Maruki, Hideaki.

    1994-01-01

    The present invention sufficiently ensures video output images even if lenses of a television camera of a monitoring means are degraded to reduce the quantity of transmission light. That is, a light amount control mechanism capable of controlling the quantity of illumination light irradiated from an illumination device at an output level of a sensor of an inspection device main body. A test chart for measuring a luminance which is an output level of the sensor is disposed. During plant operation, the lenses of the television camera undergo influences of radioactivity and are degraded to reduce the quantity of transmission light on every periodical monitoring and inspection using a travelling type monitoring inspection device. In this case, the test chart disposed near the equipment to be monitored and inspected is caught by the television camera to measure a sensor output luminance. Then, the light amount control mechanism of the illumination device is controlled so as to provide a luminance which has been set at an initial stage of the plant inspection. With such procedures, video data of the objective equipment to be monitored and inspected can be obtained at a constant luminance during inspection. (I.S.)

  7. Development of bore tools for pipe inspection

    Energy Technology Data Exchange (ETDEWEB)

    Oka, Kiyoshi; Nakahira, Masataka; Taguchi, Kou; Ito, Akira [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-04-01

    In the International Thermonuclear Reactor (ITER), replacement and maintenance on in-vessel components requires that all cooling pipes connected be cut and removed, that a new component be installed, and that all cooling pipes be rewelded. After welding is completed, welded area must be inspected for soundness. These tasks require a new work concept for securing shielded area and access from narrow ports. Tools had to be developed for nondestructive inspection and leak testing to evaluate pipe welding soundness by accessing areas from inside pipes using autonomous locomotion welding and cutting tools. A system was proposed for nondestructive inspection of branch pipes and the main pipe after passing through pipe curves, the same as for welding and cutting tool development. Nondestructive inspection and leak testing sensors were developed and the basic parameters were obtained. In addition, the inspection systems which can move inside pipes and conduct the nondestructive inspection and the leak testing were developed. In this paper, an introduction will be given to the current situation concerning the development of nondestructive inspection and leak testing machines for the branch pipes. (author)

  8. Heat exchanger tube inspection using ultrasonic arrays

    International Nuclear Information System (INIS)

    Meyer, P.A.; Carodiskey, T.J.

    1986-01-01

    Tubing used in industrial heat exchangers is often subject to failure caused by corrosion and cracking. Technical conferences are used as a forum in the steam generator industry to ensure that the failure mechanisms are well understood and that the quality of the heat exchanger is maintained. The quality of a heat exchanger can be thought of as its ability to operate to design specifications over its intended life. This is the motivation to inspect and evaluate these devices periodically. Inspection, however, normally requires shutdown of the heat exchanger which is costly but is much more acceptable than an unscheduled shutdown due to failure of a tube. Therefore, the degree of inspection is established by balancing the cost of inspection with the risk of a tube failure. Any method of reducing the cost of inspection will permit a higher degree of inspection and, therefore, improve heat exchanger quality. This paper reviews the design and performance of an improved method of ultrasonic inspection of heat exchanger tubing with emphasis on applications in the nuclear industry

  9. Efforts toward enhancing seismic safety at Kashiwazaki Kariwa Nuclear Power Station

    International Nuclear Information System (INIS)

    Yamashita, Kazuhiko

    2009-01-01

    It has been two years since the Niigata-ken Chuetsu-oki Earthquake (NCOE) occurred in 2007. The earthquake brought a major disaster for Kashiwazaki, Kariwa, and the neighboring areas. First of all, we would like to give condolences to people in the devastated area and to pray for the immediate recovery. Our Kashiwazaki Kariwa Nuclear Power Station located in the same area was naturally caught up in the earthquake. The station was hit by a big tremor more than its intensity assumed to be valid at the station design stage. In spite of unexpected tremor, preventive functions for the station safety worked as expected as it designed. Critical facilities designed as high seismic class were not damaged, though considerable damages were seen in outside-facilities designed as low seismic class. We currently make efforts to inspect and recover damages. While we carefully carry out inspection and assessment to make sure the station integrity, we are also going forward restoration as well as construction for seismic safety enhancement in turn. This report introduces details of the following accounts, these are an outline of guidelines for seismic design evaluation that was revised in 2006, a situation at Kashiwazaki Kariwa Nuclear Power Station in the aftermath of the earthquake, and efforts toward enhancing seismic safety that the Tokyo Electric Power Company (TEPCO) has made since the seismic disaster, and our approach to evaluation of facility integrity. (author)

  10. Application for the Tape Station

    CERN Document Server

    Solero, A

    2003-01-01

    The Tape Station is used as an Isolde facility to observe the variations of intensity and the lifespan of certain isotopes. A Siemens Simatic FM-352-5 module controls the Tape Station in a PLC system then a DSC controls the PLC, which will be controlled the Tape station program. During the Isolde consolidation project, the Tape Station has been rebuilt, and the control system has been fully integrated in the PS control. Finally, a new application has been written in JAVA Development kit 1.4 and the PS Java environment. The main purpose of this note is to explain how to use this program.

  11. Space Station Engineering Design Issues

    Science.gov (United States)

    Mcruer, Duane T.; Boehm, Barry W.; Debra, Daniel B.; Green, C. Cordell; Henry, Richard C.; Maycock, Paul D.; Mcelroy, John H.; Pierce, Chester M.; Stafford, Thomas P.; Young, Laurence R.

    1989-01-01

    Space Station Freedom topics addressed include: general design issues; issues related to utilization and operations; issues related to systems requirements and design; and management issues relevant to design.

  12. Photochemical Assessment Monitoring Stations (PAMS)

    Data.gov (United States)

    U.S. Environmental Protection Agency — Photochemical Assessment Monitoring Stations (PAMS). This file provides information on the numbers and distribution (latitude/longitude) of air monitoring sites...

  13. Inspection of licensee - Maintenance programme and activities

    International Nuclear Information System (INIS)

    2013-01-01

    An effective maintenance programme is critical to sustained safe and reliable operation of nuclear power plants. The Working Group on Inspection Practices (WGIP) concluded that when a licensee has an effective maintenance programme, the overall operating safety of the plant is improved and the protection of public health and safety enhanced. All Regulatory Bodies (RB) consider maintenance to be an important area for oversight. Although a variety of inspection practices are being used; RB are actively monitoring licensee performance. Specifically the following conclusions were reached and commendable practices identified: - Maintenance oversight by regulators appears to be in a stable continuous improvement state. Most regulators are executing inspection oversight based on an existing regulatory framework. - The performance of a licensee's maintenance programme is recognized as important part of maintaining nuclear safety. The result of the maintenance program assessment is included in the overall performance assessment of a license. - Maintenance inspection activities are recognized as an important part of the regulatory oversight process. Inspection activities are based on the safety significance and nature of work being performed by the licensee. - The effectiveness of the maintenance inspection activities is recognized to rely on properly qualified inspectors; who are adequately supported by specialists. Training and qualification of inspectors should be based on how the RB reviews and inspects licensee maintenance programmes. - Reporting requirements are identified to provide information on the licensees maintenance programme, and to help guide inspection activities. - Performance Indicators are recognized as a useful tool for helping focus regulatory activities. Basic PI are identified and tracked by the RB, and use of PI by the licensee is monitored. - Inspections are designed to confirm that the licensee is planning and scheduling maintenance with due

  14. Discussion on unpacking inspection of imported civil nuclear safety equipment

    International Nuclear Information System (INIS)

    Li Chan; Zhang Wenguang; Li Maolin; Li Shixin; Jin Gang; Yao Yuan

    2014-01-01

    This paper introduces the purpose, contents, process and requirements of unpacking inspection which is the second stage of safety inspection of imported civil nuclear safety equipment, expresses review key points on application documents of unpacking inspection, processes of witness on-the-spot before unpacking inspection outside the civil nuclear facilities by the test agency, discusses understanding of unpacking inspection, supervision of manufacture, inspection prior to shipment, supervision of loading and acceptance by the unit operating civil nuclear facilities, reports on unpacking inspection. Some suggestions on reinforcing the unpacking inspection in China are concerned. (authors)

  15. UF{sub 6} cylinder inspections at PGDP

    Energy Technology Data Exchange (ETDEWEB)

    Lamb, G.W.; Whinnery, W.N. [Martin Marietta Energy Systems, Inc., Paducah, KY (United States)

    1991-12-31

    Routine inspections of all UF{sub 6} cylinders at the Paducah Gaseous Diffusion Plant have been mandated by the Department of Energy. A specific UF{sub 6} cylinder inspection procedure for what items to inspect and training for the operators prior to inspection duty are described. The layout of the cylinder yards and the forms used in the inspections are shown. The large number of cylinders (>30,000) to inspect and the schedule for completion on the mandated time table are discussed. Results of the inspections and the actions to correct the deficiencies are explained. Future inspections and movement of cylinders for relocation of certain cylinder yards are defined.

  16. Pathology Residents Comprise Inspection Team for a CAP Self-Inspection

    Directory of Open Access Journals (Sweden)

    Stacy G. Beal MD

    2017-03-01

    Full Text Available We report our experience at the University of Florida in which residents and fellows served as the inspection team for a College of American Pathologists (CAP self-inspection. We aimed to determine whether the CAP self-inspection could serve as a learning opportunity for pathology residents and fellows. To prepare for the inspection, we provided a series of 4 lunchtime seminars covering numerous laboratory management topics relating to inspections and laboratory quality. Preparation for the inspection began approximately 4 months prior to the date of the inspection. The intent was to simulate a CAP peer inspection, with the exception that the date was announced. The associate residency program director served as the team leader. All residents and fellows completed inspector training provided by CAP, and the team leader completed the team leader training. A 20 question pre- and posttest was administered; additionally, an anonymous survey was given after the inspection. The residents’ and fellows’ posttest scores were an average of 15% higher than on the pretest ( P < .01. The surveys as well as subjective comments were overwhelmingly positive. In conclusion, the resident’s and fellow’s experience as an inspector during a CAP self-inspection was a useful tool to learn accreditation and laboratory management.

  17. Station History Of The Seismic Station In Ahmadu Bello University ...

    African Journals Online (AJOL)

    Dominants in the selected events are events from Meditterranian, East Kazakhstan, India/Burma/China, South and Central America and North Ascension island regions. The limited number of events reporting at the station was due to low operational gain at the station which permitted only events whose magnitudes are ...

  18. MRT fuel element inspection at Dounreay

    Energy Technology Data Exchange (ETDEWEB)

    Gibson, J.

    1997-08-01

    To ensure that their production and inspection processes are performed in an acceptable manner, ie. auditable and traceable, the MTR Fuel Element Fabrication Plant at Dounreay operates to a documented quality system. This quality system, together with the fuel element manufacturing and inspection operations, has been independently certified to ISO9002-1987, EN29002-1987 and BS5750:Pt2:1987 by Lloyd`s Register Quality Assurance Limited (LRQA). This certification also provides dual accreditation to the relevant German, Dutch and Australian certification bodies. This paper briefly describes the quality system, together with the various inspection stages involved in the manufacture of MTR fuel elements at Dounreay.

  19. Optical technologies for measurement and inspection

    International Nuclear Information System (INIS)

    Mader, D.L.

    1997-01-01

    Ontario Hydro has benefited from specialized optical measurement techniques such as FRILS (fret replica inspection laser system), which permits in-house inspections of pressure tube replicas and has been estimated to save $2M per year. This paper presents a brief overview of (1) FRILS, (2) OPIT (in-reactor Optical Profilometry Inspection Tool), (3) miniature optical probe for steam generator tubes, (4) laser vibrometer used for end-fitting vibration, and (5) computer vision to recognize the ends of fuel bundles and automatically measure their lengths. (author)

  20. Reliability of application of inspection procedures

    Energy Technology Data Exchange (ETDEWEB)

    Murgatroyd, R A

    1988-12-31

    This document deals with the reliability of application of inspection procedures. A method to ensure that the inspection of defects thanks to fracture mechanics is reliable is described. The Systematic Human Error Reduction and Prediction Analysis (SHERPA) methodology is applied to every task performed by the inspector to estimate the possibility of error. It appears that it is essential that inspection procedures should be sufficiently rigorous to avoid substantial errors, and that the selection procedures and the training period for inspectors should be optimised. (TEC). 3 refs.