WorldWideScience

Sample records for inspection service plant

  1. 9 CFR 113.6 - Animal and Plant Health Inspection Service testing.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Animal and Plant Health Inspection Service testing. 113.6 Section 113.6 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION... STANDARD REQUIREMENTS Applicability § 113.6 Animal and Plant Health Inspection Service testing. A...

  2. Pre-service inspection and in-service inspection in Japan

    International Nuclear Information System (INIS)

    Uebayashi, T.; Miyake, Y.

    1985-01-01

    To ensure the safety of nuclear power plant, pre-service inspection/in-service inspection (PSI/ISI) has an important role, and informations obtained from various inspections during plant shut-down period are contributing to establish effective preventive maintenance activities for plant facilities. It might be said that the high level of availability of Japanese light-water nuclear power plants in these two or three years has been achieved by those efforts. In case of Japan, inspections to be carried out during scheduled plant shut-down period are not limited to code requirements but include many other inspections which are mostly reflected from troubles experienced in both domestic and overseas plants. Usually, those additional inspections are performed by Ministry of Trade and Industries' (MITI's) regulator and/or tentative requirement and considered as ISI in broad meaning. To achieve high availability of plant, it is essential to avoid unscheduled shut-down and to shorten inspection period. The developments of new technology to perform effective ISI for operating plants are continued, but on the other hand it is also very important to pay a great consideration to inspectability of the plants at the stage of plant engineering. With the leadership of MITI, improvement and standardization of light-water nuclear power plant has been proceeded and newly constructed plants have great advantage from the point of view on ISI

  3. Scheduling and coordination for in-service inspection of nuclear power plant

    International Nuclear Information System (INIS)

    Li Songbai

    1996-11-01

    Based on the practice and experiences of pre-service and in-service inspections for Daya Bay Nuclear Power Plant (NPP) by Research Institute of Nuclear Power Operation (RINPO) following RSEM code, requirements of utility and actual situation in China, the in-service inspection preparation for organization, techniques and equipment/tooling, materials, personnel and documentation is briefly described. And the scheduling and coordinating consideration for planed in-service inspection activities during NPP outage is emphatically introduced. (2 refs., 4 figs.)

  4. In-service inspection of nuclear power plants

    International Nuclear Information System (INIS)

    1991-01-01

    This Manual is intended to provide more comprehensive considerations on the management, organization, preparation, improvement and implementation of in-service inspection activities and the related surveillance. It also gives illustrative examples of good practices and recommendations from operating and other organizations that are consistent with the requirements and recommendations of the Code and Safety Guides. The Manual is directed primarily towards plant management. This Manual should be used in conjunction with the Code and the Safety Guides, in particular with IAEA Safety Series Nos. 50-C-O, 50-SG-O2, 50-SG-05, 50-SG-07, 50-SG-08 and 50-SG-D1, which contain recommendations of a general character about maintenance activities and radiation protection in an operating power plant, and with the 'Manual on the Maintenance of Systems and Components Important to Safety'. This Manual is divided into four technical sections. The first introduces the purpose, structure and main requirements of the programme. The second section describes constituents of the programme, recommending its scope, scheduling, acceptance standards and documentation of results. The following section goes into details of the inspection programme's contents, such as the selection of components, inspection locations, defect types, applicable techniques and procedures, and the evaluation of results. The last section specifies recommended methods and techniques for inspection, such as visual, ultrasonic, eddy current, magnetic particle and others. This main part of the Manual is complemented by a number of annexes which reproduce actual national examples of established procedures, ISI programme parts, acceptance standards, personnel training programmes, testing techniques and other aspects of in-service inspection, illustrating practical implementation of the recommendations of the Manual

  5. In-service inspection techniques

    International Nuclear Information System (INIS)

    Backfisch, W.; Zipser, R.R.

    1980-01-01

    The owner of a nuclear power plant (NPP) is obligated and interested to maintain - by regular maintenance and in-service inspections - the operational safety and availability of the plant for the subsequent operating period in a condition, as is specified as the basis of the erection and the last operational permits. In-service inspections are performed to verify the operational safety, and maintenance work is performed to guarantee the availability. Below, the typical in-service inspections of a light-water reactor NPP (operated on a pressurized-water reactor or on a boiling-water reactor) are described with details and examples of typical inspections, especially of recurrent performance tests of the systems. (orig./RW)

  6. Study and discussion on management of nuclear island in-service inspection procedure system in nuclear power plant

    International Nuclear Information System (INIS)

    Zhang Xueliang; Fan Yancheng

    2014-01-01

    In-service inspection of nuclear island is the important way for keeping safety operation of nuclear power plant. Taking Daya Bay Nuclear Power Plant as example, the management problems of in-service inspection system was studied and discussed from the angle of references, contents, classifications etc. Based on comparison with French practice, some points of view on perfection of in-service inspection system and improvement of management ability under future multi-bases and multi-units management mode were presented. (authors)

  7. Application of risk-informed methods to in-service piping inspection in Framatome type nuclear power plants

    International Nuclear Information System (INIS)

    Kim, Jin Hoi; Lee, Jeong Seok; Yun, Eun Sub

    2014-01-01

    The Pressurized water reactor owners group (PWROG) developed and applied a risk-informed in-service inspection (RI-ISI) program, as an alternative to the existing ASME Section XI sampling inspection method. The RI-ISI programs enhance overall safety by focusing inspections of piping at high safety significance (HSS) locations where failure mechanisms are likely to be present. Additionally, the RI-ISI program can reduce nondestructive evaluation (NDE) exams, man-rem exposure for inspectors, and inspection time, among other benefits. The RI-ISI method of in-service piping inspection was applied to 3 units (KSNPs: Korea standard nuclear power plants) and is being deployed to the other units. In this paper, the results of RI-ISI for a Framatome type (France CPI) nuclear power plant are presented. It was concluded that application of RI-ISI to the plant could enhance and maintain plant safety, as well as provide the benefits of greater reliability.

  8. 9 CFR 590.128 - Holiday inspection service.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Holiday inspection service. 590.128... of Service § 590.128 Holiday inspection service. (a) When an official plant requires inspection service on a holiday or a day designated in lieu of a holiday, such service is considered holiday work...

  9. A web environment for inspection service

    International Nuclear Information System (INIS)

    Robles Guemes, N.; Garcia Heras, M.; Cueto-Felgueroso Garcia, C.; Pelaez Gutierrez, J. A.

    2013-01-01

    The in-service inspection fundamental objective is to maintain the structural integrity of structures, systems and components during the life in the installation service. Nuclear power plants are required to implement a Service inspection program in accordance with the established regulation by the Regulatory body.

  10. Nuclear containment systems and in-service inspection status of Korea nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Jihong, Park; Jaekeun, Hong; Banuk, Park [Korea Institute of Machinery and Materials, Dept. of Authorized Test and Evaluation, Kyungnam (Korea, Republic of)

    2007-07-01

    20 unit nuclear power plants in Korea have been operated and maintained since the first unit started in commercial service in 1978. Most recently 4 units were under construction and several units were planned to be constructed. by industries. 4 types of nuclear containment systems have been constructed until now: first, metal containments, then pre-stressed concrete containments with grouted tendon systems, followed by pre-stressed concrete containments with un-grouted tendon systems, and Korea standard nuclear containments. All the nuclear containments should be inspected periodically. Therefore for periodic in-service inspection, several appropriate technical requirements should be applied differently depending on the specific nuclear containment types. With the changes of times, nuclear containment systems have undergone a remarkable change, and finally nuclear containment system of Korea standard nuclear power plant was settled down, and as a matter of course it dominates the trend of present and future nuclear containment systems. Overall in-service inspection results of most Korea nuclear containments have not showed any serious evidence of degradation.

  11. Risk informed In-service Inspection

    International Nuclear Information System (INIS)

    Corak, Z.

    2003-01-01

    Safety of nuclear power plants is one of the most important conditions for their acceptance. Safety is being acheived by numerous methods and techniques in phase of design, manufacturing and maintenance of the nuclear power plants. In-service Inspection (ISI) has a significant role in avoidances of failure in components of nuclear power plants just the same as in assurance of their integrity. Non-destructive examinations are performed periodically in accordance with 10 CFR 50 50.55a and ASME Boiler and Pressure Vessel Code section XI which is referenced by 10 CFR 50.55a. Nondestructive examinations provide information about a current condition of equipment at nuclear power plants and about any damage, defect or degradation mechanism. A lot of effort is often spent in situations in which the probability of failure and their effects on safety have a very low impact. Practical experience shows that failures can often occur at locations where the inspection has never been performed. Costs and expenses of in-service inspections are very high. Therefore, the accent has to be on locations with significant risk to safety. Many years of nuclear power plants' operation and maintenance have resulted in a more broad knowledge of degradation mechanism and the most susceptible locations and huge databases of different nuclear power plants' components. U.S. Nuclear Regulatory Commission (NRC) and the nuclear industry have recognized that probabilistic risk assessment (PRA) has developed and changed to be more useful in improvement of traditional engineering approaches in nuclear power plants regulation. After the publication of its policy statement on the use of PRA in nuclear regulatory activities, the Commission ordered the NRC staff to develop a regulatory framework that incorporated risk insights. The American Society of Mechanical Engineers (ASME) initiated Code Case N-560, N-577, and N-578 that address the importance of categorization and inspection of piping using risk

  12. Automated ultrasonic inspection of nuclear plant components

    International Nuclear Information System (INIS)

    Baron, J.A.; Dolbey, M.P.

    1982-01-01

    For reasons of safety and efficiency, automated systems are used in performing ultrasonic inspection of nuclear components. An automated system designed specifically for the inspection of headers in a nuclear plant is described. In-service inspection results obtained with this system are shown to correlate with pre-service inspection results obtained by manual methods

  13. Optimizing pre-service inspection data

    International Nuclear Information System (INIS)

    Mullins, L.E.; Harrison, J.M.

    1986-01-01

    The phenomenon of intergranular stress corrosion cracking (IGSCC) in nuclear power plant piping systems has been the single biggest factor in an evolution that has changed and continues to change in-service inspection practices and philosophy throughout the industry. In-service inspection has been found to deal with several distinct phases of the problem. At the onset, existing technology was demonstrated to be unable to detect IGSCC adequately. This inability to detect IGSCC was soon overcome. However, it immediately pointed out the difficulties associated with the discrimination between IGSCC and other harmless metallurgical conditions. On the heels of detection and discrimination came problems associated with determining crack size and the monitoring of overlayed flaws. A wealth of information has been written on all phases of IGSCC; however, one particular aspect has as of yet seen little attention. With an increasing number of plants choosing to replace flawed pipe, the pre-service inspection of the replaced piping demands increased attention. The lessons learned through inspection for IGSCC need again to be applied to the replacement piping. Through increased attention at installation, many of the difficulties associated with proper inservice inspection may be reduced or eliminated, thereby realizing an economy in outage scheduling, personnel exposure, and, overall, a more reliable in-service examination

  14. In-service inspection of nuclear power-plant pressure components

    International Nuclear Information System (INIS)

    Lautzenheiser, C.E.

    1976-01-01

    The early light-water-reactor systems for production of commercial power were designed and fabricated in accordance with the codes then being used for fossil-fired power-generating stations with some design changes for increased inspectability during fabrication. Over the past few years, major strides have been made in in-service inspection technology. Work has been under way to determine the reliability of nondestructive testing methods and to develop formal inspection programs throughout the world. The major problems associated with in-service inspection are the scarcity of qualified personnel, the variability in procedures and data recording between inspection agencies, and exposure of inspection personnel to radiation. Further work will be required to more completely mechanize piping inspections to reduce radiation exposure and to standardize inspection procedures, equipment, and certification of personnel. Worldwide attention to the requirements of the American Society of Mechanical Engineers' Boiler and Pressure Vessel Code, the size and integrity of inspection agencies, and efforts such as the development of personnel qualification and certification guides emphasize the importance of in-service inspection to nuclear safety

  15. Enhanced InService Inspection system for BWR plant

    International Nuclear Information System (INIS)

    Shouji, Hajime; Kobayashi, Teruo; Nagao, Tetsuya

    1993-01-01

    An enhanced InService Inspection system (ISI) has been developed, consisting of newly designed automated scanners, automated pipe inspection system and a high speed data acquisition/analysis station. This system uses a trackless magnetic crawler type nozzle inspection scanner attached to the nozzle shoulder by magnetic wheels. The automated pipe inspection system consists of an automated scanner, controller and high speed data acquisition station. These advanced automatic inspection systems are very useful for ISI, especially in reducing the radiation exposure and time required. (author)

  16. Review of activities relevant to in-service inspection

    International Nuclear Information System (INIS)

    Imanaka, N.

    1980-01-01

    Nuclear power plants are requested to provide continuing safety that cannot compare with other industries, as plant safety is a matter of much concern. To provide continuous assurance for plant safety there is increasing tendency to demand much of inspection of components during the lifetime. This inservice inspection of LMFBRs should be investigated from a view point of different systems and characteristics from LWRs. In this paper a review for inservice inspection of LMFBRs is described. To provide a continuous assurance of safety to the LMFBR, it is essential to develop how to construct the components to maintain the integrity throughout the service lifetime. Especially how to design is urged for this object. In-service inspection should be located only to compensate some uncertainty remained at the design stage, as it is too much complex in practice. As for inspection techniques, leak monitoring is assumed to be a best way to assure the plant safety continuously with the minimum plant outage time and minimum radioactive hazard to the inspectors

  17. Discussion of in-service inspection planning for nuclear power plants

    International Nuclear Information System (INIS)

    Aoki, Takayuki; Takagi, Toshiyuki

    2012-01-01

    For creating an inspection plan for industrial plants like nuclear power plants, it is necessary to have a well-grounded basis. Therefore, this paper proposes a method for determining the following three elements of such a plan: the equipment to be inspected, the inspection method to be adopted, and the timing of its implementation using a scientific approach. The key idea is to analyze the components of the plan by employing the understanding of cancer detection and diagnosis in medical science and also to take an approach of creating a plan based on the characteristic features of the component and its aging degradation mode, the performance of the inspection method, and the relationship between the two. Taking all the above into account, the factors to be considered and the best way for inspecting the plants are presented in this paper. (author)

  18. Increase plant safety and reduce cost by implementing risk-informed in-service inspection programs

    International Nuclear Information System (INIS)

    Billington, A.; Monette, P.

    2001-01-01

    The idea behind the program is that it is possible to 'inspect less, but inspect better'. In other words, the risk-informed In-Service Inspection (ISI) process is used to improve the effectiveness of examination of piping components, i.e. concentrate inspection resources and enhance inspection strategies on high safety significant locations, and reduce inspection requirements on others. The Westinghouse Owners Group (WOG) risk-informed ISI process has already been applied for full scope (Millstone 3, Surry 1) and limited scope (Beznau, Ringhals 4, Asco, Turkey Point 3). By examining the high safety significant piping segments for the different fluid piping systems, the total piping core damage frequency is reduced. In addition, more than 80% of the risk associated with potential pressure boundary failures is addressed with the WOG risk-informed ISI process, while typically less that 50% of this same risk is addressed by the current inspection programs. The risk-informed ISI processes are used to improve the effectiveness of inspecting safety-significant piping components, to reduce inspection requirements on other piping components, to evaluate improvements to plant availability and enhanced safety measures, including reduction of personnel radiation exposure, and to reduce overall Operation and Maintenance (O and M) costs while maintaining regulatory compliance. A description of the process as well as benefits from past projects is presented, since the methodology is applicable for WWER plant design. (author)

  19. Increase plant safety and reduce cost by implementing risk-informed In-Service Inspection programs

    International Nuclear Information System (INIS)

    Billington, A.; Monette, P.; Doumont, C.

    2000-01-01

    The idea behind the program is that it is possible to 'inspect less, but inspect better'. In other words, the risk-informed In-Service Inspection (ISI) process is used to improve the effectiveness of examination of piping components, i.e. concentrate inspection resources and enhance inspection strategies on high safety significant locations, and reduce inspection requirements on others. The Westinghouse Owners Group (WOG) risk-informed ISI process has already been applied for full scope (Millstone 3, Surry 1) and limited scope (Beznau, Ringhals 4, Asco, Turkey Point 3). By examining the high safety significant piping segments for the different fluid piping systems, the total piping core damage frequency is reduced. In addition, more than 80% of the risk associated with potential pressure boundary failures is addressed with the WOG risk-informed ISI process, while typically less than 50% of this same risk is addressed by the current inspection programs. The risk-informed ISI processes are used: to improve the effectiveness of inspecting safety-significant piping components; to reduce inspection requirements on other piping components; to evaluate improvements to plant availability and enhanced safety measures, including reduction of personnel radiation exposure; and to reduce overall Operation and Maintenance (O and M) costs while maintaining regulatory compliance. A description of the process as well as benefits of past projects is presented, since the methodology is applicable for VVER plant design. (author)

  20. 9 CFR 355.21 - Products entering inspected plants.

    Science.gov (United States)

    2010-01-01

    ... INSPECTION AND CERTIFICATION CERTIFIED PRODUCTS FOR DOGS, CATS, AND OTHER CARNIVORA; INSPECTION... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Products entering inspected plants. 355.21 Section 355.21 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF...

  1. 76 FR 65165 - Importation of Plants for Planting; Risk-Based Sampling and Inspection Approach and Propagative...

    Science.gov (United States)

    2011-10-20

    ..., this 14th day of October 2011. Kevin Shea, Acting Administrator, Animal and Plant Health Inspection... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service [Docket No. APHIS-2011-0092] Importation of Plants for Planting; Risk-Based Sampling and Inspection Approach and Propagative Monitoring and...

  2. RIBA Project - Risk-Informed approach for In-Service Inspection of Nuclear Power Plant Components. Project summary

    International Nuclear Information System (INIS)

    Lidbury, D.; Smith, G.

    2001-12-01

    The need for a European review of a Risk-Informed Approach for In-Service Inspection of Nuclear Power Plant Components (RIBA) was identified in 1998. This was as a priority item in the programme of activities conducted in the framework of the Council Resolutions of 22 July 1975 and of 18 June 1992 on the Technological Problems of Nuclear Safety. The RIBA Project was established in November 1999 as a 24-month Study Contract funded by the European Commission within the frame of the former DG XI WGCS (Working Group on Codes and Standards). The Study Contract was subsequently managed for the EC by DG TREN. The participants in RIBA were Serco Assurance (project coordinator), Ringhals AB, EDF, Tecnatom SA and Westinghouse Electric Europe. The work is presented in a summary report with the detailed results contained in three companion reports as follows: main conclusions and recommendations, Review of Existing Risk-Informed Methodologies, A Comparative Study of Risk-Informed In-Service Inspection Applications, Conclusions and Recommendations for Risk-Informed in-service inspection methodology applied to Nuclear Power Plants in Europe. (author)

  3. Development of data acquisition and processing system for In-service inspection of nuclear power plants

    International Nuclear Information System (INIS)

    Takama, Shinkichi; Kobayashi, Koji; Satoh, Yoshio; Koga, Yoshihiro; Shimizu, Takakazu

    1981-01-01

    In-service inspection (ISI) is required during the plant outage to assure the reliability of the components of a nuclear power plant. IHI has developed the advanced ISI system which consists of remote controlled and mechanized ultrasonic inspection devices for reactor pressure vessel examination, semi-automatic inspection instruments for piping examination with manual scan and automatic recording, data acquisition and processing system with microprocessor and mini-computer. By this system, ISI can be performed fully satisfying the requirement of ASME Code Sec. XI and minimizing operation in the high radioactive areas. All ultrasonic information is processed by the computer and the examination results such as size and location of ultrasonic indication are printed out in the form of sectional and plan view of the part examined, reproduced screen image and polar plot, etc. as well as the evaluation sheet. This system saves the elaborate work of inspection personnel and is expected to contribute to the improvement of inspection quality and to the reduction of radiation exposure of inspection personnel. (author)

  4. 9 CFR 355.3 - Plants eligible for inspection.

    Science.gov (United States)

    2010-01-01

    ... INSPECTION AND CERTIFICATION CERTIFIED PRODUCTS FOR DOGS, CATS, AND OTHER CARNIVORA; INSPECTION... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Plants eligible for inspection. 355.3 Section 355.3 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE...

  5. An overview of non destructive inspection services in nuclear power plants

    International Nuclear Information System (INIS)

    Farley, S.

    2004-01-01

    Worldwide nuclear power plants are obliged by international and local authorities to perform periodical inspection and maintenance of safety relevant components. Non-Destructive Testing (NDT) techniques such as eddy current, ultrasonic, visual, dye penetrant and radiographic testing have been used and continually developed to inspect a wide range of components and materials. Inspecting such components invariably poses an interesting chal-lenge due to complex component geometries, radiation exposure and the material make-up of the component or its welds. As a leader in services to the nuclear industry, Westinghouse has an immense knowl-edge and experience in inspecting and repairing primary circuit components such as steam generators, reactor vessels, core internals, primary coolant pumps and loops, fuel elements and many other components in hazardous environments. To fulfil the requirements posed by authorities and inspection standards, remotely operated manipulators and vehicles have been designed to bring a diverse variety of probes and cameras to the object of inspection. Each inspection process is tested and qualified by the relevant qualification body. In some cases the results of an inspection may require further in depth analysis or even repair of part of the component. These added challenges have often been met by specifically designed and qualified processes such as for the repair of vessel head penetrations or the re-pair of vessel nozzle safe end welds. This presentation will give a general overview of a range of inspection capabilities and give a few examples in which repair was successfully performed. (author)

  6. Beliefs concerning the reliability of nuclear power plant in-service inspections

    International Nuclear Information System (INIS)

    Kettunen, J.

    1997-01-01

    The aim of the study was to investigate belief systems held by the officials responsible for the planning and supervision of NDT operations within the Finnish nuclear industry. They were asked to express their opinions on (1) the reliability of NDT methods in general, (2) the factors influencing the reliability of in-service inspections, and (3) the degree of reliability of the current inspections operations conducted by means of NDT methods in the Finnish nuclear power plants. Another goal of the study was to assess the adequacy of officials' beliefs (or belief systems). The research data was collected by interviewing representatives from Finnish power companies (Imatran Voima Oy and Teollisuuden Voima Oy), independent inspection organisations, and the Finnish Centre for Radiation and Nuclear Safety (STUK). The adequacy of the beliefs expressed was assessed by means of the results obtained from international NDT reliability studies and on the basis of interviewees' own justification. (refs.)

  7. Maintenance, surveillance and in-service inspection in nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2002-01-01

    Effective maintenance, surveillance and in-service inspection (MS and I) are essential for the safe operation of a nuclear power plant. The objective of this Safety Guide is to provide recommendations and guidance for MS and I activities to ensure that SSCs important to safety are available to perform their functions in accordance with the assumptions and intent of the design. This Safety Guide covers the organizational and procedural aspects of MS and I. However, it does not give detailed technical advice in relation to particular items of plant equipment, nor does it cover inspections made for and/or by the regulatory body. This Safety Guide provides recommendations and guidance for preventive and remedial measures, including testing, surveillance and in-service inspection, that are necessary to ensure that all plant structures, systems and components (SSCs) important to safety are capable of performing as intended. This Safety Guide covers measures for fulfilling the organizational and administrative requirements for: establishing and implementing schedules for preventive and predictive maintenance, repairing defective plant items, selecting and training personnel, providing related facilities and equipment, procuring stores and spare parts, and generating, collecting and retaining maintenance records for establishing and implementing an adequate feedback system for information on maintenance. MS and I should be subject to quality assurance in relation to all aspects important to safety. Quality assurance has been dealt with in detail in other IAEA safety standards and is covered here only in specific instances, for emphasis. In Section 2, a concept of MS and I is presented and the interrelationship between maintenance, surveillance and inspection is discussed. Section 3 concerns the functions and responsibilities of different organizations involved in MS and I activities. Section 4 provides recommendations and guidance on such organizational aspects as

  8. Maintenance, surveillance and in-service inspection in nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2005-01-01

    Effective maintenance, surveillance and in-service inspection (MS and I) are essential for the safe operation of a nuclear power plant. The objective of this Safety Guide is to provide recommendations and guidance for MS and I activities to ensure that SSCs important to safety are available to perform their functions in accordance with the assumptions and intent of the design. This Safety Guide covers the organizational and procedural aspects of MS and I. However, it does not give detailed technical advice in relation to particular items of plant equipment, nor does it cover inspections made for and/or by the regulatory body. This Safety Guide provides recommendations and guidance for preventive and remedial measures, including testing, surveillance and in-service inspection, that are necessary to ensure that all plant structures, systems and components (SSCs) important to safety are capable of performing as intended. This Safety Guide covers measures for fulfilling the organizational and administrative requirements for: establishing and implementing schedules for preventive and predictive maintenance, repairing defective plant items, selecting and training personnel, providing related facilities and equipment, procuring stores and spare parts, and generating, collecting and retaining maintenance records for establishing and implementing an adequate feedback system for information on maintenance. MS and I should be subject to quality assurance in relation to all aspects important to safety. Quality assurance has been dealt with in detail in other IAEA safety standards and is covered here only in specific instances, for emphasis. In Section 2, a concept of MS and I is presented and the interrelationship between maintenance, surveillance and inspection is discussed. Section 3 concerns the functions and responsibilities of different organizations involved in MS and I activities. Section 4 provides recommendations and guidance on such organizational aspects as

  9. New Swedish regulations in the area of plant inspection and in-service inspection

    International Nuclear Information System (INIS)

    Hansson, B.

    1998-01-01

    History and present status od Swedish regulations in the field of NPP inspection and in-service inspection are described. The presentation focuses on the development of regulations and establishing new ones. A description of different organisations involved is included

  10. Automation and mechanization of in-service inspection of selected equipment in FRG's nuclear power plants

    International Nuclear Information System (INIS)

    Metke, E.

    1988-01-01

    The procedures and equipment are described for the automation and mechanization of in-service inspection in nuclear power plants in the FRG, used by the KWU company. Checks of the pressure vessel are done by visual means using a colour tv camera, the method of eddy currents and the ultrasonic method. An analysis is made of the time schedule of ultrasonic inspections, and the central column manipulator is described which allows to check all internal regions of the pressure vessel. Attention is also devoted to other devices, e.g., those for prestressing shanks, cleaning shanks, cleaning thread apertures, etc. A combined probe using the ultrasonic method and the eddy current method serves the inspection of heat exchange tubes in the steam generator. For inspecting the primary circuit the KWU company uses devices for checking and working the inner surface of pipes. Briefly described are examples of using KWU equipment in nuclear power plants in CMEA countries. (Z.M.). 11 figs., 6 refs

  11. Study on In-Service Inspection Program and Inspection Technologies for Commercialized Sodium-Cooled Fast Reactor

    International Nuclear Information System (INIS)

    Masato Ando; Shigenobu Kubo; Yoshio Kamishima; Toru Iitsuka

    2006-01-01

    The objective of in-service inspection of a nuclear power plant is to confirm integrity of function of components necessary to safety, and satisfy the needs to protect plant investment and to achieve high plant ability. The sodium-cooled fast reactor, which is designed in the feasibility study on commercialized fast reactor cycle systems in Japan, has two characteristics related to in-service inspection. The first is that all sodium coolant boundary structures have double-wall system. Continuous monitoring of the sodium coolant boundary structures are adopted for inspection. The second characteristic is the steam generator with double-wall-tubes. Volumetric testing is adopted to make sure that one of the tubes can maintain the boundary function in case of the other tube failure. A rational in-service inspection concept was developed taking these features into account. The inspection technologies were developed to implement in-service inspection plan. The under-sodium viewing system consisted of multi ultrasonic scanning transducers, which was used for imaging under-sodium structures. The under-sodium viewing system was mounted on the under-sodium vehicle and delivered to core internals. The prototype of under-sodium viewing system and vehicle were fabricated and performance tests were carried out under water. The laboratory experiments of volumetric testing for double-wall-tubes of steam generator, such as ultrasonic testing and remote-field eddy current testing, were performed and technical feasibility was assessed. (authors)

  12. 7 CFR 52.83 - Reporting results of the plant survey and inauguration of inspection services.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 2 2010-01-01 2010-01-01 false Reporting results of the plant survey and inauguration... AGRICULTURAL MARKETING SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE REGULATIONS AND STANDARDS UNDER THE AGRICULTURAL MARKETING ACT OF 1946 PROCESSED FRUITS AND VEGETABLES...

  13. In-service inspection of nuclear power plants

    International Nuclear Information System (INIS)

    Asty, M.; Saglio, R.

    1984-10-01

    The French Commissariat a l'Energie Atomique (Atomic Energy Commission) developed two new non destructive control techniques, focused ultrasonics and multi-frequency eddy currents, which have been shown to allow a better detection and characterization of defects. We present here some of the in-service inspection devices which have been designed for field application of these techniques on the PWR reactors built by EDF, inspection devices of the PWR steam generator tubing and the now developing specific device for main tank and helicoidal tubing steam generator of Super-Phenix 1 [fr

  14. The applications of risk-informed in-service-inspection

    International Nuclear Information System (INIS)

    Ting, K.; Ko, T.-H.; Li, Y.-C.; Wu, W.-F.; Lu, Y.-L.; Chien, F.-T.

    2005-01-01

    The US NRC and nuclear industry encouraged the applications of risk-informed In-Service Inspection (RI-ISI) which can be an alternative program to the ASME Section XI In-service Inspection requirements. The Implementation of RI-ISI can improve the substantial cost as well as does reductions. From the aspect of defense in depth for nuclear safety, the achievements of these procedures can identify the inspection rank to promote the integrity of the current inspection program. Thus, this study utilizes this techniques to implement risk assessment on safety class 1 recirculation piping welds where sensitized to IGSCC of Taibei BWR-6 nuclear power plant. In the evaluation process, WinPraise code is used to calculate the failure probabilities of all welds. The result of risk evaluations can be referred to the further regulatory and plant operation. (authors)

  15. Conceptual design of in-service inspection and maintenance for KALIMER

    International Nuclear Information System (INIS)

    Ju, Y. S.; Kim, S. H.; Koo, K. H.; You, B.

    1999-01-01

    In-service inspection and maintenance are very important for the safety and availability of nuclear power plants. The conceptual requirements of in-service inspection and maintenance should be reflected in the earlier design process for the verification of the plant operability and reliability. In this paper the fundamental approaches of the inspection and maintenance for KALIMER are established to ensure the structural integrity and operability for KALIMER. The general strategy and methodology of maintenance and inspection for the reactor system and components are proposed and described for satisfying the intents of the Section XI, Division 3, of ASME code and considering the design characteristics of KALIMER

  16. Risk-informed in-service inspections of nuclear power plants: European activities

    International Nuclear Information System (INIS)

    Simola, K.; Gandossi, L.

    2010-01-01

    Risk-informed in-service inspection (RI-ISI) methods aim at enhancing ISI effectiveness by taking into account the risk importance of possible inspection sites. These methods are widely applied in US, but in Europe the situation is different, as there are many regulatory environments implying a variety of ISI codes and standards and national guidelines. The objective of the European Network for Inspection Qualification, ENIQ, is to co-ordinate and to manage at European level expertise and resources for the qualification of non-destructive inspection techniques and procedures primarily for the in-service inspection of nuclear components. ENIQ has established a Task Group on Risk (TGR) to work towards developing best practice for RI-ISI methodologies. TGR has published a European framework document for risk-informed in-service inspection, and the group has been working at producing more detailed recommended practices and discussion documents on several RI-ISI related issues. In addition, TGR has been active in initiating international projects, such as the JRC-OECD/NEA coordinated RI-ISI benchmark exercise (RISMET). This paper describes the activities and publications of TGR to date, and summarises the contents and main results of the RISMET RI-ISI benchmark exercise. (orig.)

  17. Reliability-based service life assessment of concrete structures in nuclear power plants: optimum inspection and repair

    International Nuclear Information System (INIS)

    Ellingwood, B.R.; Mori, Y.

    1995-01-01

    Research is being conducted to address aging management of safety-related reinforced concrete structures in nuclear power plants (NPPs). Documentation is being prepared to identify potential structural safety issues and to recommend criteria for use in evaluating reinforced concrete structures for continued service. Time-dependent reliability analysis provides the framework and quantitative tools for the condition assessment. The role of in-service inspection and repair in ensuring continued reliability in-service is examined. (author). 19 refs., 4 figs

  18. An overview of in-service inspection for nuclear power plants in Japan

    International Nuclear Information System (INIS)

    Takano, Eishiro

    1996-01-01

    In nuclear power stations, for maintaining the safety of machinery and equipment, it is stipulated to carry out periodic inspection. The contents of the periodic inspection and the inspections of important matters are explained. In-service inspection (ISI) is the nondestructive inspection for confirming the soundness of reactor pressure vessels, main pipings, valves and others. The stipulations on the scope and time of the periodic inspection and ISI, the course of introducing ISI into Japan, and the basic way of thinking on ISI are described. Pre-service inspection (PSI) is carried out for the purpose of collecting and recording the initial data for ISI. The range of the objects of nondestructive inspection and leak test and the range of the objects of leak test only are shown. As to nondestructive inspection, the parts to be inspected, the frequency of inspection and the methods of inspection, and the method of leak test are described. As the present state of inspection technology, the automatic ultrasonic flow detectors for reactor vessels, piping welded parts and reactor vessel stud bolts, and the eddy current flaw detector for steam generator tubes are explained. (K.I.)

  19. In service inspection of pipes based on risk methods

    International Nuclear Information System (INIS)

    Mendoza G, G.; Viais J, J.; Carmona C, M.

    2006-01-01

    The politics of the Nuclear Regulatory Commission (by its initials in English NRC) of the United States of America on the use of the Probabilistic Safety Analysis (PSA) in activities of nuclear regulation it foments the use of this analysis technique to improve the decisions making, to reduce the unnecessary work in maintenance aspects, inspection and tests and to improve the regulatory efficiency. The inspection programs in service (ISI by its initials in English) developed by the American Society of Mechanical Engineers (by its initials in English ASME) it has been the one primary mechanism to prove the mechanical equipment in plants of nuclear energy, these programs indeed have been carried out in plants of nuclear energy by more of two decades. Their purpose is to identify the conditions, such as indications of cracks that are precursory of flights and ruptures which violate the integrity principles of the pressure frontier. The inspection in service activities include ultrasonic tests, surface tests and penetrating liquids test, also activities that include the scaffolds construction, removal of insulations and welding polishing. The inspections in service every 18 months during the times outside of service are executed. One of the objectives is to lower the costs of the inspections during the times outside of service and to reduce the exposure to the radiation by part of the personnel during these times out for inspections, while it is increased or it maintains the personnel's safety and the reliability. As part of the methodology a pipe segment is selected for which a fault in any point has the same consequences, being calculated the fault probability of the tube using the dimensions of the segment. In this work the inspection in service methodology is applied based on risk to an aspersion system of low pressure of the Laguna Verde Nucleo electric Central. For this system a reduction in the number of welding to inspect of 103 to only 15 is obtained

  20. Advanced Approach of Reactor Pressure Vessel In-service Inspection

    International Nuclear Information System (INIS)

    Matokovic, A.; Picek, E.; Pajnic, M.

    2006-01-01

    The most important task of every utility operating a nuclear power plant is the continuously keeping of the desired safety and reliability level. This is achieved by the performance of numerous inspections of the components, equipment and system of the nuclear power plant in operation and in particular during the scheduled maintenance periods at re-fueling time. Periodic non-destructive in-service inspections provide most relevant criteria of the integrity of primary circuit pressure components. The task is to reliably detect defects and realistically size and characterize them. One of most important and the most extensive examination is a reactor pressure vessel in-service inspection. That inspection demand high standards of technology and quality and continual innovation in the field of non-destructive testing (NDT) advanced technology as well as regarding reactor pressure vessel tool and control systems. A remote underwater contact ultrasonic technique is employed for the examination of the defined sections (reactor welds), whence eddy current method is applied for clad surface examinations. Visual inspection is used for examination of the vessel inner surface. The movement of probes and data positioning are assured by using new reactor pressure vessel tool concept that is fully integrated with NDT systems. The successful performance is attributed thorough pre-outage planning, training and successful performance demonstration qualification of chosen NDT techniques on the specimens with artificial and/or real defects. Furthermore, use of advanced approach of inspection through implementation the state of the art examination equipment significantly reduced the inspection time, radiation exposure to examination personnel, shortening nuclear power plant outage and cutting the total inspection costs. The advanced approach as presented in this paper offer more flexibility of application (non-destructive tests, local grinding action as well as taking of boat samples

  1. In-service inspections of the reactor cooling system of pressurized water reactors

    International Nuclear Information System (INIS)

    Fuerste, W.; Hohnerlein, G.; Werden, B.

    1982-01-01

    In order to guarantee constant safety of the components of the reactor cooling system, regular in-service inspections are carried out after commissioning of the nuclear power plant. This contribution is concerned with the components of the reactor cooling system, referring to the legal requirements, safety-related purposes and scope of the in-service inspections during the entire period of operation of a nuclear power plant. Reports are made with respect to type, examination intervals, examination technique, results and future development. The functional tests which are carried out within the scope of the in-service inspections are not part of this contribution. (orig.) [de

  2. Risk-based inspection in the context of nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Soares, Wellington A.; Vasconcelos, Vanderley de; Rabello, Emerson G., E-mail: soaresw@cdtn.br, E-mail: vasconv@cdtn.br, E-mail: egr@cdtn.br [Centro de Desenvolvimento da Tecnologia Nuclear (CDTN/CNEN-MG), Belo Horizonte, MG (Brazil)

    2015-07-01

    Nuclear power plant owners have to consider several aspects like safety, availability, costs and radiation exposure during operation of nuclear power plants. They also need to demonstrate to regulatory bodies that risk assessment and inspection planning processes are being implemented in effective and appropriate manner. Risk-Based Inspection (RBI) is a methodology that, unlike time-based inspection, involves a quantitative assessment of both failure probability and consequence associated with each safety-related item. A correctly implemented RBI program classifies individual equipment by its risks and prioritizes inspection efforts based on this classification. While in traditional deterministic approach, the inspection frequencies are constant, in the RBI approach the inspection interval for each item depends on the risk level. Regularly, inspection intervals from RBI result in risk levels lower or equal than deterministic inspection intervals. According to the literature, RBI solutions improve integrity and reduce costs through a more effective inspection. Risk-Informed In-service Inspection (RI-ISI) is the equivalent term used in the nuclear area. Its use in nuclear power plants around world is briefly reviewed in this paper. Identification of practice methodologies for performing risk-based analyses presented in this paper can help both Brazilian nuclear power plant operator and regulatory body in evaluating the RI-ISI technique feasibility as a tool for optimizing inspections within nuclear plants. (author)

  3. Risk-based inspection in the context of nuclear power plants

    International Nuclear Information System (INIS)

    Soares, Wellington A.; Vasconcelos, Vanderley de; Rabello, Emerson G.

    2015-01-01

    Nuclear power plant owners have to consider several aspects like safety, availability, costs and radiation exposure during operation of nuclear power plants. They also need to demonstrate to regulatory bodies that risk assessment and inspection planning processes are being implemented in effective and appropriate manner. Risk-Based Inspection (RBI) is a methodology that, unlike time-based inspection, involves a quantitative assessment of both failure probability and consequence associated with each safety-related item. A correctly implemented RBI program classifies individual equipment by its risks and prioritizes inspection efforts based on this classification. While in traditional deterministic approach, the inspection frequencies are constant, in the RBI approach the inspection interval for each item depends on the risk level. Regularly, inspection intervals from RBI result in risk levels lower or equal than deterministic inspection intervals. According to the literature, RBI solutions improve integrity and reduce costs through a more effective inspection. Risk-Informed In-service Inspection (RI-ISI) is the equivalent term used in the nuclear area. Its use in nuclear power plants around world is briefly reviewed in this paper. Identification of practice methodologies for performing risk-based analyses presented in this paper can help both Brazilian nuclear power plant operator and regulatory body in evaluating the RI-ISI technique feasibility as a tool for optimizing inspections within nuclear plants. (author)

  4. Inspection of Nuclear Power Plant Containment Structures

    Energy Technology Data Exchange (ETDEWEB)

    Graves, H.L.; Naus, D.J.; Norris, W.E.

    1998-12-01

    Safety-related nuclear power plant (NPP) structures are designed to withstand loadings from a number of low-probability external and interval events, such as earthquakes, tornadoes, and loss-of-coolant accidents. Loadings incurred during normal plant operation therefore generally are not significant enough to cause appreciable degradation. However, these structures are susceptible to aging by various processes depending on the operating environment and service conditions. The effects of these processes may accumulate within these structures over time to cause failure under design conditions, or lead to costly repair. In the late 1980s and early 1990s several occurrences of degradation of NPP structures were discovered at various facilities (e.g., corrosion of pressure boundary components, freeze- thaw damage of concrete, and larger than anticipated loss of prestressing force). Despite these degradation occurrences and a trend for an increasing rate of occurrence, in-service inspection of the safety-related structures continued to be performed in a somewhat cursory manner. Starting in 1991, the U.S. Nuclear Regulatory Commission (USNRC) published the first of several new requirements to help ensure that adequate in-service inspection of these structures is performed. Current regulatory in-service inspection requirements are reviewed and a summary of degradation experience presented. Nondestructive examination techniques commonly used to inspect the NPP steel and concrete structures to identify and quantify the amount of damage present are reviewed. Finally, areas where nondestructive evaluation techniques require development (i.e., inaccessible portions of the containment pressure boundary, and thick heavily reinforced concrete sections are discussed.

  5. GIMIS - Integral Solution for the In-Service Inspection Management of Components in NPPs

    International Nuclear Information System (INIS)

    Borovic, Damir; Vukovic, Igor

    2014-01-01

    Performance of in-service testing and inspection of components and systems in nuclear power plants are required in order to maintain the nuclear power plant while in operation and to return the plant to service, following plant outages. GIMIS is comprehensive software that integrates all processes, functions and data related to planning, administrating and executing inspections on systems, structures and components in nuclear power plants. The software is designed as a web application developed using the Microsoft ASP.NET technology, database is a Microsoft SQL, and client is composed of JavaScript frameworks. It can be adapted to local language, regulations, and requirements according to the power plant needs. The application consists of seven interdependent modules, namely: components, equipment, personnel, requirements, inspection planning, inspection execution, and reports. GIMIS deals with component, equipment and personnel management (both internally employed and outsourced), also provides full component history including uploaded documentation, drawings, previous inspection results, and supports various types of requirements. It enables scheduling facilitation using component data and compliance requirements, offers generation of all inspection relevant documentation and reports, and covers the equipment management including calibration requirements, certification of equipment and allocation to specific inspections/outages, as well as personnel certifications and allocation to specific inspections/outages. The paper describes the content and functionality of the GIMIS application and provides information of its built-in capabilities and features. (authors)

  6. Improvement of in-service inspection in nuclear power plants

    International Nuclear Information System (INIS)

    2004-07-01

    During the nuclear power plant's (NPPs) operating lifetime, the operating organisation should examine the systems, structures and components (SSCs) for possible deterioration so as to determine whether they are acceptable for continued safe operation or whether remedial measures should be taken. In-service inspection (ISI) provides the systematic framework for these examinations. An effective ISI programme ensures both that the safety of the plant is not adversely affected after the commencement of operation and that the levels of reliability and availability of all plant SSCs remain in accordance with the assumptions and intent of the design and, consequently, a cost effective electricity generation is guaranteed. This report was prepared under one of the IAEA projects, 'Integrated NPP life cycle management including decommissioning'. The main objective of an integrated life cycle management programme is to enable NPPs to compete, without compromising safety, successfully in the changing energy markets throughout their service life and to facilitate life extension and eventual decommissioning through improved engineering, technological, economic and managerial actions. The Technical Working Group on NPP Life Management and other advisory groups nominated by the Member States provide recommendations on high priority needs of Member States in this area. The purpose of this TECDOC is to: discuss and evaluate the status of ISI and its evolution in NPPs of IAEA Member States; discuss and evaluate the criteria for effective ISI and the constitutive elements; discuss and evaluate the implication of the introduction of risk informed ISI (RI-ISI) concepts; generate a common recommendation as to how to benefit from utilising the potential of RI-ISI concepts for further development and, possibly, improvement of ISI effectiveness. The specific concept of this report is to treat the two key issues, i.e. inspection qualification and RI-ISI, and their complementarities, to

  7. A risk-informed approach to optimising in-service inspection of piping

    International Nuclear Information System (INIS)

    Billington, A.; Monette, P.

    1999-01-01

    Traditional criteria for the selection of in-service inspection locations in piping, have come to be regarded as being out-of-touch with current knowledge of piping failures and with current measures of safety importance. An alternative , risk-informed, method has been developed and successfully licensed, that systematically establishes an inspection plan addressing all safety-related piping systems, in a way that is optimized with respect to the safety gain achieved through in-service inspection. The principles of the method are discussed and the results of several applications are summarized, all of which demonstrate that the risk-informed program would lead to significant improvements in the overall level of plant safety, while at the same time re-distributing the inspections in such a way that reduces both plant costs and radiation exposure to personnel.(author)

  8. The 1978 first in-service inspection of the reactor pressure vessel of the second unit of the Greifswald nuclear power plant

    International Nuclear Information System (INIS)

    Pastor, D.; Busch, R.; Hildebrandt, E.; Redlich, K.H.

    1979-01-01

    The reactor pressure vessel and the primary coolant circuit of the second 440-MW(e) unit of the Greifswald nuclear power plant were subjected to an in-service inspection. Extent of the inspection, development and construction of a reactor inspection container as well as the nondestructive materials testing methods used are described. Further, problems of performing the inspection, such as needs of time and personnel and radiation exposure, are considered. Finally, it is stated that the reactor pressure vessel was in safe operating state. (author)

  9. A web environment for inspection service; Un entorno WEB para la inspeccion en servicio

    Energy Technology Data Exchange (ETDEWEB)

    Robles Guemes, N.; Garcia Heras, M.; Cueto-Felgueroso Garcia, C.; Pelaez Gutierrez, J. A.

    2013-07-01

    The in-service inspection fundamental objective is to maintain the structural integrity of structures, systems and components during the life in the installation service. Nuclear power plants are required to implement a Service inspection program in accordance with the established regulation by the Regulatory body.

  10. Risk informed in-service inspection and testing in Spain

    International Nuclear Information System (INIS)

    Bros, Juan; Marcelles, Ignacio

    2002-01-01

    The Spanish nuclear regulatory authority, the Consejo de Seguridad Nuclear (CSN), requires the use of codes and standards in force in the country of origin of the plant technology. For this reason, the in-service inspection and testing programs applied at Spanish nuclear power plants basically adhere to the requirements of the ASME XI and ASME OM Codes. It is not surprising that when the earliest developments aimed at drawing up risk informed inservice inspection and testing programs were initiated within the framework of ASME, the Spanish industry should follows such developments very closely. In fact, persons within the Spanish nuclear industry joined different ASME committees involved in the development and approval of the various code cases encompassing these developments. Developments specific to the Spanish nuclear power plants were initiated at a time when the aforementioned reference documentation was in a very advanced stage of development/approval. Two clearly differentiated lines of work got under way: On the one hand, and as regards risk informed in-service testing programs, the American standards were used as the sole reference. In the case of risk informed in-service inspection programs, the Spanish nuclear power plant-owning utilities and the Consejo de Seguridad Nuclear decided to draw up a Spanish guideline that, although using the ASME developments as a reference, would have its own specific characteristics. In relation to the above, and referring to the chronology of the events, the activities performed to date in Spain are described

  11. Advanced In-Service Inspection Approaches Applied to the Phenix Fast Breeder Reactor

    International Nuclear Information System (INIS)

    Guidez, J.; Martin, L.; Dupraz, R.

    2006-01-01

    The safety upgrading of the Phenix plant undertaken between 1994 and 1997 involved a vast inspection programme of the reactor, the external storage drum and the secondary sodium circuits in order to meet the requirements of the defence-in-depth safety approach. The three lines of defence were analysed for every safety related component: demonstration of the quality of design and construction, appropriate in-service inspection and controlling the consequences of an accident. The in-service reactor block inspection programme consisted in controlling the core support structures and the high-temperature elements. Despite the fact that limited consideration had been given to inspection constraints during the design stage of the reactor in the 1960's, as compared to more recent reactor projects such as the European Fast Reactor (EFR), all the core support line elements were able to be inspected. The three following main operations are described: Ultrasonic inspection of the upper hangers of the main vessel, using small transducers able to withstand temperatures of 130 deg. C, Inspection of the conical shell supporting the core dia-grid. A specific ultrasonic method and a special implementation technique were used to control the under sodium structure welds, located up to several meters away from the scan surface. Remote inspection of the hot pool structures, particularly the core cover plug after partial sodium drainage of the reactor vessel. Other inspections are also summarized: control of secondary sodium circuit piping, intermediate heat exchangers, primary sodium pumps, steam generator units and external storage drum. The pool type reactor concept, developed in France since the 1960's, presents several favourable safety and operational features. The feedback from the Phenix plant also shows real potential for in-service inspection. The design of future generation IV sodium fast reactors will benefit from the experience acquired from the Phenix plant. (authors)

  12. Targeted In-service Inspections Using Risk Insights

    International Nuclear Information System (INIS)

    Kulat, S.; Montgomery, B.; Robin Graybeal, M.

    2012-01-01

    This paper includes a discussion of the historical background and rationale for development of a targeted In-service Inspection (ISI) program using risk insights, known as Risk-Informed In-service Inspection (RI-ISI). RI-ISI programs are optimized inspection programs which target specific welds for inspection based upon potential degradation mechanisms and consequences of failure. Inspections are performed on those welds that are the highest contributors to plant risk. Additionally the inspections are tailored to detect the specific postulated degradation mechanisms. As a result, the numbers of inspections are reduced along with the associated cost and radiation exposure, while maintaining or improving the level of quality and safety. Provided in this paper are the basic principles of RI-ISI program development, and a summary of the impact of the implementation of such programs. For example, implementation of a Risk-Informed In-service Inspection program results in a reduction of both cost and radiation exposure. Cost savings are estimated at between USD 1,000,000 and USD 2,300,000 per unit per ten year interval for a Class 1 and2 RI-ISI application. Cost savings are estimated based on average cost per weld of USD 7600 for examination, including the following activities: erection and removal of scaffolding, removal and replacement of insulation, removal and replacement of interferences, weld preparation, examination, documentation, craft support. Reduction in radiation exposure is estimated at 75% to 90% for a Class 1 and2 RI-ISI application. Reduction in radiation exposure is due to the following factors: number of welds selected for examination decreases by 60% to 75%, surface examinations essentially eliminated, within a given risk category, welds can be selected for examination based on additional factors such as the minimization of radiation exposure.(author).

  13. In-service inspection program for the NCS-80 reactor pressure vessel

    International Nuclear Information System (INIS)

    Scharge, J.; Wehowsky, P.; Zeibig, H.

    1978-01-01

    The in-service inspection program of reactor pressure vessels is mainly based on the ultra-sonic method, visual checking of inner and outer surfaces as well as pressure and leak tests. The test procedure require a design of the pressure vessel suitable for the test methods and the possibility to remove the pressure vessel internals. For the outside inspection a gap of sufficient width is mandatory. The present status of the ultra-sonic method and of the inner and outer manipulators affords to conduct the in-service inspection program in form of automatic checkings. The in-service inspection program for NCS-80, the Nuclear Container-Ship design of 80,000 shp, is integrated in the refueling periods due to the request for a high availability of the ship and reactor plant

  14. Planning and programming of pre-operational and in-service inspections

    International Nuclear Information System (INIS)

    Udaondo, M.S.

    1984-01-01

    After a brief mention of the actual scope of in-service inspection work, conclusions are presented that relate to the preparations for inspections, making use of experience acquired since 1972 at 11 nuclear power plants in Spain which have commissioned such studies from one particular organization, and analyses are given of the advantages to be gained therefrom. Three different aspects of preparations for inspections are considered: (a) man-hour estimates and the duration of in-service inspections; (b) the sequence of action during a pre-operational inspection (assuming a typical functional organization) from definition of the codes of practice and standards applicable up to the issue of the final report and the schedule for distribution of the annual work load to be invested in a typical project, as a result of combining the two previous estimates, and (c) the documentary aspect of preparations for an inspection during a scheduled outage, as related to the various documents to be drawn up and their contents. Reference is made to the general training to be given to the staff in charge of inspection activities so as to provide them with information on, and a perspective of, the in-service inspection jobs required. (author)

  15. Development of a Multi-Channel Ultrasonic Testing System for Automated Ultrasonic Pipe Inspection of Nuclear Power Plant

    International Nuclear Information System (INIS)

    Lee, Hee Jong; Cho, Chan Hee; Cho, Hyun Joon

    2009-01-01

    Currently almost all in-service-inspection techniques, applied in domestic nuclear power plants, are partial to field inspection technique. These kinds of techniques are related to managing nuclear power plants by the operation of foreign-produced inspection devices. There have been so many needs for development of native in-service-inspection device because there is no native diagnosis device for nuclear power plant inspection yet in Korea. In this research, we developed several core techniques to make an automated ultrasonic pipe inspection system for nuclear power plants. A high performance multi-channel ultrasonic pulser/receiver module, an A/D converter module and a digital main CPU module were developed and the performance of the developed modules was verified. The S/N ratio, noise level and signal acquisition performance of the developed modules showed proper level as we designed in the beginning.

  16. Beliefs concerning the reliability of nuclear power plant in-service inspections; Uskomuksia ydinvoimalaitoksissa suoritettavien tarkastusten luotettavuudesta

    Energy Technology Data Exchange (ETDEWEB)

    Kettunen, J. [VTT Automation, Espoo (Finland)

    1997-01-01

    The aim of the study was to investigate belief systems held by the officials responsible for the planning and supervision of NDT operations within the Finnish nuclear industry. They were asked to express their opinions on (1) the reliability of NDT methods in general, (2) the factors influencing the reliability of in-service inspections, and (3) the degree of reliability of the current inspections operations conducted by means of NDT methods in the Finnish nuclear power plants. Another goal of the study was to assess the adequacy of officials` beliefs (or belief systems). The research data was collected by interviewing representatives from Finnish power companies (Imatran Voima Oy and Teollisuuden Voima Oy), independent inspection organisations, and the Finnish Centre for Radiation and Nuclear Safety (STUK). The adequacy of the beliefs expressed was assessed by means of the results obtained from international NDT reliability studies and on the basis of interviewees` own justification. (refs.).

  17. Plant abnormality inspection device

    International Nuclear Information System (INIS)

    Takenaka, Toshio.

    1990-01-01

    The present invention concerns a plant abnormality inspection device for conducting remote or automatic patrolling inspection in a plant and, more particularly, relates to such a device as capable of detecting abnormal odors. That is, the device comprises a moving device for moving to a predetermined position in the plant, a plurality of gas sensors for different kind of gases to be inspected mounted thereon, a comparator for comparing the concentration of a gas detected by the gas sensor with the normal gas concentration at the predetermined position and a judging means for judging the absence or presence of abnormality depending on the combination of the result of the comparison and deliverying a signal if the state is abnormal. As a result, a slight amount of gas responsible to odors released upon abnormality of the plant can be detected by a plurality of gas sensors for different kinds gases to rapidly and easily find abnormal portions in the plant. (I.S.)

  18. French codes and standards for design, construction and in-service inspection of nuclear power plants

    International Nuclear Information System (INIS)

    Hugot, G.; Grandemange, J. M.

    1995-01-01

    In 1970, France decided that its future power plants would be of the Pressurized Water Reactor type. This choice proved to be successful since it resulted in more than 60 PWR units in operation or under construction in France and abroad. At the beginning of such a program, the French engineering and manufacturing industry, the national electrical utility and the Safety Authorities had to face the many challenges imposed by the implementation of an imported technology. The government reorganised the licensing process. FRAMATOME, the NSSS vendor, and EDF (Electricite de France), the national utility, decided to create 'AFCEN', the French Association for Design and Construction Rules for Nuclear Island Components. These rules, the RCC's (Regles de Construction et de conception), which are approved by French Safety Authorities deal with mechanical and electrical equipment as well as with nuclear fuel and civil works. They are now being supplemented by in service inspection rules, the RSE's (Regles d'inspection en Service). The paper presents these Codes and their main updating following experience of application, technical progress and evolution of standards. Status of discussion concerning reference to European standardisation and developments of rules applicable to the EPR project will also be discussed

  19. In-service inspections of V-230 reactor

    International Nuclear Information System (INIS)

    Prepechal, J.

    1984-01-01

    It is stated that despite certain constraints the configuration of the WWER-440 is such that it allows to make in-service inspections on a fully satisfactory scale. Three factors are discussed whose existence is necessary for the implementation of in-service inspections. The program defining the scale of inspections is satisfactory with regard to the safety and reliability of reactor operation. Its further development must result in reducing time consumption and radiation burden of personnel. Regulations for the implementation and evaluation of inspections represent the weakest link in the system of in-service inspections. At present, various organizations are dealing with the said problem within international cooperation. Equipment for in-service inspections of WWER-440 reactors is relatively good. The most important knowledge is summed up gained from the ten pre-service and in-service inspections of reactors of this type made so far. (Z.M.)

  20. Plant inspection and maintenance technology

    International Nuclear Information System (INIS)

    Miyahara, Masatoshi; Kanazawa, Masafumi

    1995-01-01

    The article reports on information systems and related tools that support routine inspection and preventive maintenance activities, which contribute to safer plant operation and increase plant operating duty. Tools include the Mitsubishi Electric Reliability and Availability Upgrade Program-Nuclear (MELRAP-N), which supports the general evolution of industry operating experiences, periodic component replacement management, management of discontinued and modified components, periodic inspection item management, and periodic inspection workplace management. The article also introduces a comprehensive preventive maintenance management system currently under development. (author)

  1. PWR reactor vessel in-service-inspection according to RSEM

    International Nuclear Information System (INIS)

    Algarotti, Marc; Dubois, Philippe; Hernandez, Luc; Landez, Jean Paul

    2006-01-01

    Nuclear services experience Framatome ANP (an AREVA and Siemens company) has designed and constructed 86 Pressurized Water Reactors (PWR) around the world including the three units lately commissioned at Ling Ao in the People's Republic of China and ANGRA 2 in Brazil; the company provided general and specialized outage services supporting numerous outages. Along with the American and German subsidiaries, Framatome ANP Inc. and Framatome ANP GmbH, Framatome ANP is among the world leading nuclear services providers, having experience of over 500 PWR outages on 4 continents, with current involvement in more than 50 PWR outages per year. Framatome ANP's experience in the examinations of reactor components began in the 1970's. Since then, each unit (American, French and German companies) developed automated NDT inspection systems and carried out pre-service and ISI (In-Service Inspections) using a large range of NDT techniques to comply with each utility expectations. These techniques have been validated by the utilities and the safety authorities of the countries where they were implemented. Notably Framatome ANP is fully qualified to provide full scope ISI services to satisfy ASME Section XI requirements, through automated NDE tasks including nozzle inspections, reactor vessel head inspections, steam generator inspections, pressurizer inspections and RPV (Reactor Pressure Vessel) inspections. Intercontrole (Framatome ANP subsidiary dedicated in supporting ISI) is one of the leading NDT companies in the world. Its main activity is devoted to the inspection of the reactor primary circuit in French and foreign PWR Nuclear Power Plants: the reactor vessel, the steam generators, the pressurizer, the reactor internals and reactor coolant system piping. NDT methods mastered by Intercontrole range from ultrasonic testing to eddy current and gamma ray examinations, as well as dye penetrant testing, acoustic monitoring and leak testing. To comply with the high requirements of

  2. Reduced program of inspection by induced currents for condenser of Embalse nuclear power plant

    International Nuclear Information System (INIS)

    Obrutsky, L.; Mendonca, H.

    1986-01-01

    In this work it's presented a reduced inspection in service program by the technique of induced currents to the turbine condenser of Embalse's Power Plant (Cordoba). The authors based its elaboration on the results obtained in the exam of a small number of tubes and on experience obtained through four inspections in the condensers of Atucha I Power Plant, through mathematical models of oxygen and ammoniac distribution in both Power Plants, and its experimental verification in the case of Atucha I. This program improves the quality of inspection thereby reducing time, equipment and personnel employed. (C.M.) [pt

  3. Use of remote visual in-service inspection on nuclear power plants of the CEGB

    International Nuclear Information System (INIS)

    James, D.W.

    1985-01-01

    The main responsibility of the Remote Inspection Group is the design, development and procurement of the remote visual inspection equipment provided by the Generation Development and Construction Division as part of the extent of the supply for all the Central Electricity Generating Board's (CEGB) advanced gas-cooled reactors (AGR). The paper describes the operation of this equipment, together with the low light-level TV cameras that have been developed for carrying out routine remote visual inspections. The camera, known as the television remote inspection unit multi-purpose head (TRIUMPH), has been designed as a series of modules. With this system it is possible to take advantage of improvements in a particular part of the camera system and to arrange to backfit an improved module to existing TRIUMPHs. To minimize the time for carrying out routine inspections during shutdown, the AGRs have been provided with storage training and test facilities. These facilities are provided with full size mock-ups of the reactor internals so that the inspection equipment can be tested and the operating staff trained before the equipment is used on the reactor. One of the other responsibilities of the Remote Inspection Group is to carry out specific power plant remote visual inspections which are required to minimize costly plant shutdowns and construction delays. Examples are given of successful inspections that have been carried out. Over 12 years' experience has now been obtained in carrying out, at short notice, difficult inspections which involve tortuous access routes. The CEGB now holds a wide range of fibrescope and small TV cameras, together with the equipment for placing the viewing device in the correct location. A number of special fibrescopes have been developed for specific inspection needs and details of these, together with other fibrescopes owned by the CEGB, are provided. (author)

  4. Evaluation of piping reliability and failure data for use in risk-based inspections of nuclear power plants

    International Nuclear Information System (INIS)

    Vasconcelos, V. de; Soares, W.A.; Costa, A.C.L. da; Rabello, E.G.; Marques, R.O.

    2016-01-01

    During operation of industrial facilities, components and systems can deteriorate over time, thus increasing the possibility of accidents. Risk-Based Inspection (RBI) involves inspection planning based on information about risks, through assessing of probability and consequence of failures. In-service inspections are used in nuclear power plants, in order to ensure reliable and safe operation. Traditional deterministic inspection approaches investigate generic degradation mechanisms on all systems. However, operating experience indicates that degradation occurs where there are favorable conditions for developing a specific mechanism. Inspections should be prioritized at these places. Risk-Informed In-service Inspections (RI-ISI) are types of RBI that use Probabilistic Safety Assessment results, increasing reliability and plant safety, and reducing radiation exposure. These assessments use both available generic reliability and failure data, as well as plant specific information. This paper proposes a method for evaluating piping reliability and failure data important for RI-ISI programs, as well as the techniques involved. (author)

  5. Evaluation of piping reliability and failure data for use in risk-based inspections of nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Vasconcelos, V. de; Soares, W.A.; Costa, A.C.L. da; Rabello, E.G.; Marques, R.O., E-mail: vasconv@cdtn.br [Centro de Desenvolvimento da Tecnologia Nuclear (CDTN/CNEN-MG), Belo Horizonte, MG (Brazil)

    2016-07-01

    During operation of industrial facilities, components and systems can deteriorate over time, thus increasing the possibility of accidents. Risk-Based Inspection (RBI) involves inspection planning based on information about risks, through assessing of probability and consequence of failures. In-service inspections are used in nuclear power plants, in order to ensure reliable and safe operation. Traditional deterministic inspection approaches investigate generic degradation mechanisms on all systems. However, operating experience indicates that degradation occurs where there are favorable conditions for developing a specific mechanism. Inspections should be prioritized at these places. Risk-Informed In-service Inspections (RI-ISI) are types of RBI that use Probabilistic Safety Assessment results, increasing reliability and plant safety, and reducing radiation exposure. These assessments use both available generic reliability and failure data, as well as plant specific information. This paper proposes a method for evaluating piping reliability and failure data important for RI-ISI programs, as well as the techniques involved. (author)

  6. 9 CFR 590.660 - Inspection of exempted plants.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Inspection of exempted plants. 590.660... Products Plants § 590.660 Inspection of exempted plants. Duly authorized representatives of the Administrator shall make such periodic inspections of exempted plants and records thereof as the Administrator...

  7. Pre-service baseline inspection using x-probe of Oconee replacement steam generators

    International Nuclear Information System (INIS)

    Addario, M.; Shipp, P.; Davis, K.; Fogal, C.

    2003-01-01

    The eddy current method has been the industry standard for inspecting steam generator tubing for many years and the level of sophistication of coil technology has continued to evolve during that time. State of the art array probe systems now employ multiple sensitivity zones in the probe to better detect and characterize defects in an efficient manner. Owners and regulators of nuclear power plants are interested in the most effective and efficient inspection possible. The ultimate goal has been to meet or exceed new and existing regulatory and design requirements by maximizing the quantity and quality of eddy current data collected while minimizing both the time needed to perform the inspection and the radiation exposure. The X-Probe is an example of this new eddy current array technology. Qualified to detect all types of known defects in steam generator tubing, the technology is comprised of a system of probe, data acquisition instrumentation, computer and human interface software. Recently, Duke Power, along with Babcock and Wilcox Canada and the system developer R/D Tech, collaborated to implement this technology in a first of a kind full scale pre-service inspection of replacement steam generators for Duke Power's Oconee nuclear generating station at Babcock and Wilcox Canada's Cambridge plant. The discussion in this paper will briefly describe the X-Probe technology, describe the system required to perform the inspection, present the general results of the inspection and finally draw some comparative benefit conclusions for both pre-service and in-service applications. (author)

  8. ASME section XI - design and access requirements for in-service inspection

    International Nuclear Information System (INIS)

    Davis, D.D.

    1982-01-01

    The Owner of a nuclear power plant has the regulatory commitment to perform Section XI in-service inspection throughout the service life of a plant. In anticipation of what will be needed to perform adequately the required examinations and tests, sub-article IWA-1500 of Section XI not only requires that sufficient access be provided to accommodate equipment and inspection personnel but also requires that other provisions be considered such as: component surface preparations, material selections, shielding, removal and storage of hardware, handling equipment, and provisions for repairs and replacements. It is, therefore, the owner's and the architect engineer's responsibility to ensure that proper design and access provisions are incorporated to enable the owner to meet his commitments. Since the architect engineer usually has the prime responsibility for the implementation of design criteria, the owner must ensure that these provisions be considered in each phase of design and construction. The benefits of this can result in shorter outages, more meaningful examinations and tests and less radiation exposure of inspection personnel. This paper will address in detail those topics that affect design and access provisions which need to be considered during the design and construction of a nuclear power plant. (author)

  9. In-service inspection and periodic testing

    International Nuclear Information System (INIS)

    Eisele, H.; Meyer, F.A.; Zipser, R.R.

    1981-01-01

    In-service inspections are performed to verify the operational safety, and maintenance work is performed to guarantee the availability. Below, the typical in-service inspections of a light-water reactor NPP (operated on a pressurized-water reactor/PWR/ or on a boiling-water reactor/BWR/) are described with details and examples of typical inspections, especially of recurrent performance tests of the systems. (orig./RW)

  10. In-service inspection and periodic testing

    International Nuclear Information System (INIS)

    Eisele, H.; Meyer, F.A.; Zipser, R.R.

    1980-01-01

    In-service inspections are performed to verify the operational safety, and maintenance work is performed to guarantee the availability. In the present paper, the typical in-service inspections of a light-water reactor NPP (operated on a pressurized-water reactor/PWR/ or on a boiling-water reactor/BWR/) are described with details and examples of typical inspections, especially of recurrent performance tests of the systems. (orig./RW)

  11. Periodic and in-service inspection programs

    International Nuclear Information System (INIS)

    Dinu, M.

    2000-01-01

    Periodic and in-service inspection programs for Cernavoda NPP consists of periodic inspections of CANDU NPP components CSAN N-285.4 and CSAN N-285.4, in-service inspections and repair and modifications general inspection. Periodic inspection program document (PIPD) determines the systems and components subject to inspection, the category of the inspection, techniques, areas and other details.The current status of the inspection programs is presented, including containment , erosion/corrosion, pressure vessel support and snubbers, main steam lines inspection programs. Qualification program in Cernavoda NPP involves equipment qualification in the on-site laboratory, yearly certification, special equipment qualification in the National Institute of Metrology. All procedures are approved by the ISCIR (regulatory body for pressure vessel and lifting equipment) and CNCAN (National Commission on Nuclear Activities Control). Qualification of the personnel is performed according to the ISCIR Technical prescription CR 11/82 for up to 3 year period. Final qualification and licensing is performed by CNCAN

  12. 21 CFR 1210.14 - Sanitary inspection of plants.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Sanitary inspection of plants. 1210.14 Section... FEDERAL IMPORT MILK ACT Inspection and Testing § 1210.14 Sanitary inspection of plants. The sanitary conditions of any plant handling milk or cream any part of which is to be shipped or transported into the...

  13. Development of in-service inspection plans for nuclear components at the Surry 1 nuclear power station

    International Nuclear Information System (INIS)

    Vo, T.V.; Simonen, F.A.; Doctor, S.R.; Smith, B.W.; Gore, B.F.

    1993-01-01

    As part of the nondestructive evaluation reliability program sponsored by the US Nuclear Regulatory Commission at Pacific Northwest Laboratory, a methodology has been developed for establishing in-service inspection priorities of nuclear power plant components. The method uses results of probabilistic risk assessment in conjunction with the techniques of failure modes and effects analysis to identify and prioritize the most risk-important systems and components for inspection at nuclear power plants. Surry nuclear power station unit 1 was selected for demonstrating the methodology. The specific systems selected for analysis were the reactor pressure vessel, the reactor coolant, the low pressure injection including the accumulators, and the auxiliary feedwater. The results provide a risk-based ranking of components that can be used to establish a prioritization of the components and a basis for developing improved in-service inspection plans at nuclear power plants

  14. In-service inspection of pressurized water reactors

    International Nuclear Information System (INIS)

    Rapin, M.; Saglio, R.

    1983-01-01

    French legislation, which is more demanding than in other countries, had led Electricite de France, the State-owned utility, to acquire better performance in-service inspection facilities than those which existed previously. This fact has spurred the industrial development of the new technical facilities which are used worldwide today. This article presents the ''in-service inspection machine'' (MIS) for the inspection of the welds of a PWR vessel, and the inspection device of steam generator tubes; the MIS allow a remote-viewing, ultrasonic and gamma-graphic inspection; Foucault currents are the only one method adapted to the inspection steam generator tubes [fr

  15. Experience with the WWER-440 MW reactor pressure vessel in-service inspections and evaluation of their results

    International Nuclear Information System (INIS)

    Brumovsky, M.; Kralovec, J.; Prepechal, J.; Sulc, J.

    1989-01-01

    The Power Machinery Plant of Skoda Works in Plzen carries out in-service inspections of WWER-440 MW reactor pressure vessels by means of remote controlled inspection equipment - the TRC reactor test system, and some other inspections devices. The results of the in-service inspections were evaluated by methods based on the fracture mechanics approach, the knowledge of stress and strain distribution, and the operating history of the pressure vessels. Examples of types of defects found and their analysis are shown. (author). 1 tab

  16. Conceptual design and assessment of in-service inspection and maintenance of KALIMER

    Energy Technology Data Exchange (ETDEWEB)

    Joo, Young Sang; Kim, Seok Hun; Kim, Jong Bum; Lee, Jae Han [Korea Atomic Energy Research Institute, Taejeon (Korea)

    2002-05-01

    In the conceptual design stage of KALIMER, the philosophy and methodology of in-service inspection (ISI) and maintenance for the reactor system and components are proposed and described. The ISI and maintenance should be carried out throughout plant life to ensure the structural integrity and safety of KALIMER. The conceptual design of ISI and maintenance are performed for considering the design characteristics of KALIMER and the intents of the ASME XI Division 3. This report describes and summarizes the requirements and available methods of ISI and maintenance. The visual inspection and continuous monitoring play a great role in the in-service inspection of KALIMER. The major structures of KALIMER reactor system are designed for maintenance free operation for the plant life time and the maintenance philosophy is to replace major components rather than repair them. The assessment of the ISI accessibility and maintainability is performed and reviewed each major component. The postulated failure defects for each component are estimated and evaluated for KALIMER safety and reliability. 8 refs., 16 figs., 13 tabs. (Author)

  17. 9 CFR 590.24 - Egg products plants requiring continuous inspection.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Egg products plants requiring..., DEPARTMENT OF AGRICULTURE EGG PRODUCTS INSPECTION INSPECTION OF EGGS AND EGG PRODUCTS (EGG PRODUCTS INSPECTION ACT) Scope of Inspection § 590.24 Egg products plants requiring continuous inspection. No plant in...

  18. Improved plant availability by advanced condition based inspections

    International Nuclear Information System (INIS)

    Hulshof, Harry J.M.; Noteboom, Jan W.; Welberg, Paul G.M.; Bruijn, Leo E.

    2004-01-01

    An industrial plant has to operate safely, reliably and efficiently at the lowest possible cost. Plant availability plays an important role regarding economic life optimisation. Industrial installations that are under pressure and are operating at high temperatures have a limited life due to creep and fatigue. It is, therefore, of critical importance to know the location of any possible weak spots in the installation. To avoid safety risks, unplanned plant shutdown and, as a consequence, high costs for unavailability, cycling and repair, periodic inspections and strain measurements are recommended. A Speckle Image Correlation Analysis (SPICA) system enables on-stream measurement of deformation due to creep in critical areas like the heat-affected zone in welds. Plant management and operators use the strain measurements to take action when necessary and, consequently, prevent failures. In those plants that have been provided with SPICA-technology for some years plant availability has improved significantly as a result. Another important development for yielding improved availability concerns steam drums. During some 20 years, KEMA has been performing automated ultrasonic steam drum inspections from outside. The Dutch authorities accepted this methodology in this period as an alternative (rather than an addition) after several pilot projects. An advantage of this inspection methodology is the possibility to record of the inspection results and possibility of thus trending these data. The resulting reduction of through time appeared a major benefit for plant owners. Since the authorities adopted the RBI approach during the last 10 years, another advantage of the inspection methodology became apparent: complete scanning and recording of the inspection data of circumferential and longitudinal (butt and fillet) welds, inspection of nozzle welds and inner radius as well as corrosion mapping has been covering all higher risk areas in these drums. This enhanced inspection

  19. Improved plant availability by advanced condition based inspections

    Energy Technology Data Exchange (ETDEWEB)

    Hulshof, Harry J.M.; Noteboom, Jan W; Welberg, Paul G.M.; Bruijn, Leo E

    2004-06-01

    An industrial plant has to operate safely, reliably and efficiently at the lowest possible cost. Plant availability plays an important role regarding economic life optimisation. Industrial installations that are under pressure and are operating at high temperatures have a limited life due to creep and fatigue. It is, therefore, of critical importance to know the location of any possible weak spots in the installation. To avoid safety risks, unplanned plant shutdown and, as a consequence, high costs for unavailability, cycling and repair, periodic inspections and strain measurements are recommended. A Speckle Image Correlation Analysis (SPICA) system enables on-stream measurement of deformation due to creep in critical areas like the heat-affected zone in welds. Plant management and operators use the strain measurements to take action when necessary and, consequently, prevent failures. In those plants that have been provided with SPICA-technology for some years plant availability has improved significantly as a result. Another important development for yielding improved availability concerns steam drums. During some 20 years, KEMA has been performing automated ultrasonic steam drum inspections from outside. The Dutch authorities accepted this methodology in this period as an alternative (rather than an addition) after several pilot projects. An advantage of this inspection methodology is the possibility to record of the inspection results and possibility of thus trending these data. The resulting reduction of through time appeared a major benefit for plant owners. Since the authorities adopted the RBI approach during the last 10 years, another advantage of the inspection methodology became apparent: complete scanning and recording of the inspection data of circumferential and longitudinal (butt and fillet) welds, inspection of nozzle welds and inner radius as well as corrosion mapping has been covering all higher risk areas in these drums. This enhanced inspection

  20. Application of risk based inspection as a part of life management of nuclear power plants

    International Nuclear Information System (INIS)

    Vinod, Gopika; Babar, A.K.; Saraf, R.K.; Kushwaha, H.S.; Venkat Raj, V.

    2002-01-01

    Full text: Risk Informed approach is a systematic effort to improve plant safety in a more efficient manner by distributing the available safety resources depending on the importance to plant safety. This approach has found immense application in various aspects associated with Nuclear Power Plants, including design, manufacturing, operation and regulation. Typical applications of Risk Informed approach are in Technical Specification, In-Service Inspection (ISI) requirements, Motor Operated Valve testing, Configuration Control etc. In order to cater to such variety of Probabilistic Safety Assessment (PSA) based Risk Informed requirements, a software package, 'Risk Monitor' has been developed by the authors. An important application of Risk informed approach that has been undertaken for Indian Pressurised Heavy Water Reactor (IPHWR) is towards Risk Informed In-Service Inspection (RI-ISI). Studies are being conducted to evolve an inspection plan that is optimised to provide effective inspections at the right location with a proper inspection frequency. Using risk informed approach, the identification of system / component for inspection resource allocation is based on the results from Level 1 PSA of a NPP. Even though this methodology can be employed on any of the nuclear components/systems such as mechanical systems, instrumentation, etc., as a starting point, piping has been considered for employing Risk Informed Inspection. Plant risk assessment is modelled through the analysis of Core Damage Frequency (CDF) using PSA models. Risk Informed Inspection program of piping involves the estimation of failure probability or frequency of a piping segment and estimation of consequences of piping failures. ISI program changes could affect the failure probability values of piping and can introduce a change in CDF. These effects can be brought out through the implementation of Risk Informed inspection strategy. Various importance measures like Fussel-Vesely, Birnbaum

  1. Periodical in-service inspection as part of individual program of quality assurance of steam generators and pressurizers of WWER 440 nuclear power plant

    International Nuclear Information System (INIS)

    Kawalec, M.

    1982-01-01

    The manufacturers of equipment for nuclear power plants in the Czechoslovak Socialist Republic are obligated to process so-called individual programs of quality assurance in order to secure the quality of selected equipment in nuclear power. These programmes should include the evaluation of the design of the individual equipments with regard to the implementation of in-service inspection. The main problems are discussed related to the processing of the program of quality assurance for the steam generator and pressurizer. To solve these problems it is necessary that the general project designer should make a classification of the components according to safety categories and that the manufacturers should determine the weak points of the design on the basis of an analysis of the design of individual component nodes. On the basis of such an analysis it is then necessary to evaluate the existing design of the scale of in-service inspections and to decide whether or not new inspection methods should be added. (Z.M.)

  2. Nuclear power plant pressure vessels. Inservice inspections

    International Nuclear Information System (INIS)

    1995-01-01

    The requirements for the planning and reporting of inservice inspections of nuclear power plant pressure vessels are presented. The guide specifically applies to inservice inspections of Safety class 1 and 2 nuclear power plant pressure vessels, piping, pumps and valves plus their supports and reactor pressure vessel internals by non- destructive examination methods (NDE). Inservice inspections according to the Pressure Vessel Degree (549/73) are discussed separately in the guide YVL 3.0. (4 refs.)

  3. Specialists' meeting on in-service inspection and monitoring of LMFBRs. Summary report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1980-11-01

    The purpose of the meeting sponsored by the IAEA on the recommendation of the International Working Group on Fast Reactors (IWGFR) was attended by participants from France, the Federal Republic of Germany, Italy, Japan, the Netherlands, United Kingdom, United States of America, and two international organizations: CEC and IAEA. The purpose of the meeting was to review and discuss inspection requirements and concepts developed in the IWGFR member countries, development of inspection methods and their application in practical work and to recommend future development. The technical sessions were divided into four topical sessions as follows: General Concepts for In-Service Inspection of the Reactor Plant; Remotely Controlled Inspection Systems; Ultrasonic Test Methods; Miscellaneous Test Methods.

  4. Specialists' meeting on in-service inspection and monitoring of LMFBRs. Summary report

    International Nuclear Information System (INIS)

    1980-11-01

    The purpose of the meeting sponsored by the IAEA on the recommendation of the International Working Group on Fast Reactors (IWGFR) was attended by participants from France, the Federal Republic of Germany, Italy, Japan, the Netherlands, United Kingdom, United States of America, and two international organizations: CEC and IAEA. The purpose of the meeting was to review and discuss inspection requirements and concepts developed in the IWGFR member countries, development of inspection methods and their application in practical work and to recommend future development. The technical sessions were divided into four topical sessions as follows: General Concepts for In-Service Inspection of the Reactor Plant; Remotely Controlled Inspection Systems; Ultrasonic Test Methods; Miscellaneous Test Methods

  5. 9 CFR 307.5 - Overtime and holiday inspection service.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Overtime and holiday inspection... INSPECTION AND CERTIFICATION FACILITIES FOR INSPECTION § 307.5 Overtime and holiday inspection service. (a..., at the rate specified in § 391.3, for the cost of the inspection service furnished on any holiday as...

  6. Eddy current and ultrasonic fuel channel inspection at Karachi Nuclear Power Plant

    International Nuclear Information System (INIS)

    Mayo, W.R.; Alam, M.M.

    1997-01-01

    In November of 1993 and in-service inspection was performed on eight fuel channels in the Karachi Nuclear Power Plant (KANUPP) reactor. The workscope included ultrasonic and eddy current volumetric examinations, and eddy current measurement of pressure-to calandria tube gap. This paper briefly discusses the planning strategy of the ultrasonic and eddy current examinations, and describes the equipment developed to meet the requirements, followed by details of the actual channel inspection campaign. The presented nondestructive examinations assisted in determining fitness for service of KANUPP reactor channels in general, and confirmed that the problems associated with channel G12 were not generic in nature. (author)

  7. Study on in-service visual inspection using TV camera for core support graphite components in the HTTR

    International Nuclear Information System (INIS)

    Ishihara, Masahiro; Shibata, Taiju; Kikuchi, Takayuki; Mogi, Haruyoshi

    1999-01-01

    To maintain the structural integrity of graphite components during plant operation a visual inspection using a TV camera as an in-service inspection is planned in the High Temperature Engineering Test Reactor. In order to verify the in-service inspection method a preliminary analytical and experimental studies were performed. In the analytical study the harmful flaw size was determined from a viewpoint of structural integrity based on the fracture mechanics approach. Furthermore, the visible flaw size was determined by the TV camera performance test with graphite test specimens having several kinds of artificial flaws. This paper presents the analytical result on the harmful flaw size and the experimental result on the visible flaw size. From both results the applicability on the visual inspection by the TV camera as the in-service inspection is discussed in this paper. (author)

  8. 9 CFR 381.38 - Overtime and holiday inspection service.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Overtime and holiday inspection... Inspection; Overtime and Holiday Service; Billing Establishments § 381.38 Overtime and holiday inspection... Program, at the rate specified in § 391.3, for the cost of the inspection service furnished on any holiday...

  9. Revised inspection program for nuclear power plants

    International Nuclear Information System (INIS)

    1978-01-01

    The United States Nuclear Regulatory Commission (NRC) regulates nuclear power plants to assure adequate protection of the public and the environment from the dangers associated with nuclear materials. NRC fulfills this responsibility through comprehensive safety reviews of nuclear facilities, licensing of organizations that use nuclear materials, and continuing inspection. The NRC inspection program is currently conducted from the five regional offices in or near Philadelphia, Atlanta, Chicago, Dallas and San Francisco. Inspectors travel from the regional offices to nuclear power plants in various phases of construction, test and operation in order to conduct inspections. However, in June 1977 the Commission approved a revision to the inspection program that will include stationing inspectors at selected plants under construction and at all plants in operation. In addition, the revised program provides for appraising the performance of licensees on a national basis and involves more direct measurement and observation by NRC inspectors of work and tests in progress. The program also includes enhanced career management consisting of improved training and career development for inspectors and other professionals. The report was requested in the Conference Report on the NRC Authorization for Appropriations for Fiscal Year 1978. The report provides a discussion of the basis for both the current and revised inspection programs, describes these programs, and shows how the NRC inspection force will be trained and utilized. In addition, the report includes a discussion of the actions that will be taken to assure the objectivity of inspectors

  10. Design considerations, tooling and equipment for remote in-service inspection of radioactive piping and pressure vessel systems

    International Nuclear Information System (INIS)

    Schmoker, D.S.; Swannack, D.L.

    1983-01-01

    In-Service Inspection programs are performed to monitor and verify the integrity of a nuclear power plant's primary pressure boundaries. Early detection of abnormal structural or material degradation could preclude serious damage to plant systems. This paper summarizes results obtained in use of remotely-operated nondestructive testing (NDT) equipment for inspection of reactor system components. Experience obtained in operating the Fast Flux Test Facility (FFTF) has provided a basis for field verification of remote NDT equipment designs and has suggested development improvements. Remote Viewing and data gathering systems used include periscopes, borescopes, fiberscopes, hybrid borescopes/fiberscopes, and closed circuit television. A summary of design consideration for inspection equipment and power plant design is presented to achieve improved equipment operation and reduction of plant maintenance downtime

  11. Boresonic inspection of power plant rotors

    International Nuclear Information System (INIS)

    Rennie, I.S.

    1990-01-01

    Continental Field Machining and NEI Parsons together are able to provide an on site machining and boresonic inspection service. NEI Parsons existing boresonic equipment is described together with a summary of results obtained during the inspection of eighty rotors. A computer controlled automatic inspection system, planned to be in operation early in 1990, is also described

  12. In-service inspection guidelines for composite aerospace structures

    International Nuclear Information System (INIS)

    Heida, Jaap H.; Platenkamp, Derk J.

    2012-01-01

    The in-service inspection of composite aerospace structures is reviewed, using the results of a evaluation of promising, mobile non-destructive inspection (NDI) methods. The evaluation made use of carbon fibre reinforced specimens representative for primary composite aerospace structures, including relevant damage types such as impact damage, delaminations and disbonds. A range of NDI methods were evaluated such as visual inspection, vibration analysis, phased array ultrasonic inspection, shearography and thermography inspection. Important aspects of the evaluation were the capability for defect detection and characterization, portability of equipment, field of view, couplant requirements, speed of inspection, level of training required and the cost of equipment. The paper reviews the damage tolerance design approach for composites, and concludes with guidelines for the in-service inspection of composite aerospace structures.

  13. State-of-practice review of ultrasonic in-service inspection of Class I system piping in commercial nuclear power plants

    International Nuclear Information System (INIS)

    Morris, C.J.; Becker, F.L.

    1982-08-01

    The Pacific Northwest Laboratory conducted a survey to determine the state of practice of ultrasonic in-service inspection of primary system piping in light water reactors. Personnel at four utilities, five inspection organizations, and three domestic reactor manufacturers were interviewed. The intention of the study was to provide a better understanding of the actual practices employed in in-service inspection of primary system piping and of the difficulties encountered

  14. Update on the EPRI power generation risk-based inservice inspection pilot plant studies

    International Nuclear Information System (INIS)

    Gosselin, S.R.

    1997-01-01

    The scope for ASME Section XI ISI programs is largely based on deterministic results contained in design stress reports. These reports are normally very conservative and may not be an accurate representation of failure potential. Service experience has shown that failures are due to either corrosion or fatigue and typically occur in areas not included in the plant's ISI program. Consequently, nuclear plants are devoting significant resources to inspection programs that provide minimum benefit. As an alternative, significant industry attention has been devoted to the application of risked-based selection criteria in order to determine the scope of inservice inspection (ISI) programs at nuclear power plants. Preliminary EPRI studies indicate that the application of these techniques will allow operating nuclear plants to reduce the examination scope of current ISI programs by as much as 60 to 80%, significantly reduce costs, and continue to maintain high nuclear plant safety standards

  15. Development of Surveillance and In-Service Inspection Programme for Indian Research Reactors Cirus and Dhruva

    International Nuclear Information System (INIS)

    Shukla, D.K.

    2006-01-01

    Many safety requirements for research reactors are quite similar to those of power reactors. For research reactors with a higher hazard potential, the use of safety codes and guides for power reactors is more appropriate. However, there are many important differences between power reactors and research reactors that must be taken into account to ensure that adequate safety margins are available in design and operation of the research reactor. Most research reactors may have small potential for hazard to the public compared to power reactors but may pose a greater potential hazard to the plant operators. The need for greater flexibility in use of research reactors for individual experiments requires a different safety approach. Safety rules for power reactors are required to be substantially modified for application to specific research reactor. Following the intent of the available safety guides for surveillance and In-Service Inspection of Nuclear Power Plants, guidelines were formulated to develop surveillance and In-Service Inspection programme for research reactors Cirus and Dhruva. Based on the specific design of these research reactors, regulatory requirements, the degree of sophistication and experience of the technical organization involved in operating the research reactor, guidelines were evolved for developing and implementing the surveillance and In-Service Inspection programme for research reactors Cirus (40 MWt) and Dhruva (100 MWt) located at Bhabha Atomic Research Centre, Trombay, Mumbai, India. Paper describes the approach adopted for formulation of surveillance and In-service Inspection programme for Dhruva reactor in detail. (author)

  16. Results of calendar year 1995 Well Inspection and Maintenance Program Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    McMaster, B.W.

    1996-07-01

    This document is a compendium of results of the 1995 Monitor Well Inspection and Maintenance Program at the US Department of Energy's Oak Ridge Y-12 Plant. This report documents the work relating to well inspections and maintenance requests. Inspections are implemented in order to better assess the condition and maintenance needs of wells that are actively being monitored. Currently this approach calls for inspecting all wells on a routine (annual or triennial) basis which are: (1) in an active sampling program; (2) included in a hydrologic study; or (3) not in service, but not scheduled for plugging and abandonment. Routine inspections help to ensure that representative groundwater samples and hydrologic data are being collected, and contribute to the effective longevity of each well. This report formally presents well inspection and maintenance activities that were conducted at the Y-12 Plant from August through December 1995

  17. Development of a risk-based in-service inspection program for an LMR

    International Nuclear Information System (INIS)

    King, R.W.; Buschman, H.W.

    1996-01-01

    The emerging application of risk-based assessment technology to the operation and maintenance of nuclear power plants holds considerable promise for improving efficiency and reducing operating costs. Experimental Breeder Reactor II (EBR-II) is a liquid-metal-cooled fast reactor (LMR) that operated for 30 yr before shutting down in September 1994 due to program termination. Prior to the shutdown of EBR-II, an in-service inspection (ISI) program was developed that exploited certain advantages of the LMR design. For example, it demonstrated passive response to plant upset events, low-pressure primary coolant, and compatibility of the coolant and reactor materials. This ISI program was based on work currently being done by an American Society of Mechanical Engineers (ASME) Research Task Force on Risk-Based Inspection

  18. The role of the United States Food Safety and Inspection Service after the Chernobyl accident

    Energy Technology Data Exchange (ETDEWEB)

    Engel, Ronald E; Randecker, Victor; Johnson, Wesley [Food Safety and Inspection Service, United States Department of Agriculture (United States)

    1989-09-01

    The Food Safety and Inspection Service (FSIS) of the United States Department of Agriculture (USDA) inspects domestic and imported meat and poultry food products to assure the public that they are safe, wholesome, not economically adulterated and properly labeled. The Service also monitors the activities of meat and poultry plants and related activities in allied industries, and establishes standards and approves labels for meat and poultry products. As part of its responsibility, shortly after the Chernobyl accident occurred, FSIS developed a plan to assess this accident's impact on domestically produced and imported meat and poultry.

  19. The role of the United States Food Safety and Inspection Service after the Chernobyl accident

    International Nuclear Information System (INIS)

    Engel, Ronald E.; Randecker, Victor; Johnson, Wesley

    1989-01-01

    The Food Safety and Inspection Service (FSIS) of the United States Department of Agriculture (USDA) inspects domestic and imported meat and poultry food products to assure the public that they are safe, wholesome, not economically adulterated and properly labeled. The Service also monitors the activities of meat and poultry plants and related activities in allied industries, and establishes standards and approves labels for meat and poultry products. As part of its responsibility, shortly after the Chernobyl accident occurred, FSIS developed a plan to assess this accident's impact on domestically produced and imported meat and poultry

  20. Integration of in-service inspection works in the objectives of nuclear power plants; Integracion de los trabajos de inspeccion en servicio en los objectivos de las centrales nucleares

    Energy Technology Data Exchange (ETDEWEB)

    Garcia, M.; Lopez, M.A.

    1996-09-01

    The present articles summarizes the objectives of Spanish NPPs and the in-service inspection aspect in these objectives. The Safety maintenance, lifetime of nuclear power plants, reduction of doses and wastes and the participation of main are evaluated.

  1. Review of In-Service Inspection and Repair Technique Developments for French Liquid Metal Fast Reactors

    International Nuclear Information System (INIS)

    Baque, F.

    2005-01-01

    In-service monitoring of nuclear plants is indispensable for both the Operator and the Regulator. The notion of in-service monitoring ranges from the continuous monitoring of the reactor in operation to the thorough in-service reactor inspection during programmed shutdowns. However, the highly specific environment found in French liquid metal fast reactor plants - Phenix and Superphenix - makes monitoring and inspection complicated because of the use of a sodium coolant that is hot, opaque, and difficult to drain.The Commissariat a l'Energie Atomique, in collaboration with its traditional French partners, Electricite de France utilities and FRAMATOME/Novatome Engineering, decided to conduct a 6-yr research and development program (1994-2000) to explore this problem vis-a-vis Superphenix, as well as the possibilities of intervening within the reactor block or on components in a sodium environment. Furthermore, the safety reevaluation of Phenix, conducted between 1994 and 2003, represented an excellent 'test bench' during which the limits of inspection processes - applied to an integrated reactor concept - were surpassed using techniques such as fuel subassembly head scanning, ultrasonic examination of the core support, and visual inspection of the cover-gas plenum following a partial sodium draining. Repair techniques were investigated for cleaning of sodium wet structure surfaces, cutting of damaged parts, and welding in sodium aerosol atmosphere. Both conventional and laser processes were tested

  2. 7 CFR 2.53 - Administrator, Food Safety and Inspection Service.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Administrator, Food Safety and Inspection Service. 2... Secretary for Food Safety § 2.53 Administrator, Food Safety and Inspection Service. (a) Delegations... to the Administrator, Food Safety and Inspection Service: (1) Exercise the functions of the Secretary...

  3. Phytosanitary inspection of woody plants for planting at european union entry points: A practical enquiry

    OpenAIRE

    Eschen, René; Rigaux, Ludovic; Sukovata, Lidia; Vettraino, Anna Maria; Marzano, Mariella; Grégoire, Jean-Claude

    2015-01-01

    Phytosanitary import inspections are important to avoid entry of harmful pests on live plants. In the European Union (EU), all consignments of live plants must be inspected at the first point of entry, and plants allowed entry can be moved without further inspection among the 28 Member States and Switzerland. It is important that inspections in EU countries adhere to the same standard to avoid introduction of harmful organisms through countries with weaker methods. We tested whether sampling ...

  4. In-Service Inspection system for coolant channels of Indian PHWRS - evolution and experience

    International Nuclear Information System (INIS)

    Puri, R.K.; Singh, M.

    2006-01-01

    In-Service Inspection (ISI) is the most important of all periodic monitoring and surveillance activities for assuring the structural integrity of coolant channels in the life extension and management of pressurized heavy water reactors (PHWR-CANDU). Indian PHWRs (220 MWe) are characterized by consists by 306 coolant channels in each unit. These channels have to be inspected for various parameters over the operating life of the reactor. ISI of coolant channels necessitated the indigenous development of an inspection system called BARCIS (BARC Channel Inspection System) at Bhabha Atomic Research Center. BARCIS consists of mainly three parts; drive and control unit, special sealing plug and an inspection head carrying various NDT sensors. Five such systems have been built and deployed at various power plants. The paper deals with the development of the BARCIS system for meeting the ISI requirements of coolant channels, development cycle of this system from its conception to evolution to the present state, challenges, data generated and experience gained (ISI of nearly 900 coolant channels has been completed). Prior to BARCIS, pressure tube gauging equipment for pre-service inspection of coolant tubes was developed in 1980. Moreover a tool for ISI of coolant channels in dry condition was developed in 1990. The paper also describes evolution of various contingency procedures and devices developed over the last one decade. Future plans taking into account technological advancement, changes in the scope of inspection due to design and operating experiences and plant layout will also be covered. The paper describes the efforts put in to develop drive and control mechanism to suit the different vault layouts. The drive mechanism is responsible for linear and rotary movement of the inspection head to carry out 100% volumetric inspection. Special emphasis has been laid on the safety devices required during the inspection activity. Special measures for heavy water retention in

  5. Results of calendar year 1994 monitor well inspection and maintenance program, Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    McMaster, B.W.; Jones, S.B.; Sitzler, J.L.

    1995-06-01

    This document is a compendium of results of the calendar year 1994 Monitor Well Inspection and Maintenance Program at the Department of Energy Y-12 Plant in Oak Ridge, Tennessee. This report documents the work relating to well inspections and maintenance requests. Inspections are implemented in order to better assess the condition and maintenance needs of wells that are actively being monitored. Currently this approach calls for inspecting all wells on a routine (annual or triennial) basis which are: (1) in an active sampling program; (2) included in a hydrologic study; or (3) not in service, but not scheduled for plugging and abandonment. Routine inspections help to ensure that representative groundwater samples and hydrologic data are being collected, and contribute to the life expectancy of each well. This report formally presents well inspection and maintenance activities that were conducted at the Y-12 Plant during 1994. All inspections were conducted between April and December

  6. Results of calendar year 1994 monitor well inspection and maintenance program, Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    McMaster, B.W. [Univ. of Tennessee, Knoxville, TN (United States); Jones, S.B.; Sitzler, J.L. [Oak Ridge National Lab., TN (United States)

    1995-06-01

    This document is a compendium of results of the calendar year 1994 Monitor Well Inspection and Maintenance Program at the Department of Energy Y-12 Plant in Oak Ridge, Tennessee. This report documents the work relating to well inspections and maintenance requests. Inspections are implemented in order to better assess the condition and maintenance needs of wells that are actively being monitored. Currently this approach calls for inspecting all wells on a routine (annual or triennial) basis which are: (1) in an active sampling program; (2) included in a hydrologic study; or (3) not in service, but not scheduled for plugging and abandonment. Routine inspections help to ensure that representative groundwater samples and hydrologic data are being collected, and contribute to the life expectancy of each well. This report formally presents well inspection and maintenance activities that were conducted at the Y-12 Plant during 1994. All inspections were conducted between April and December.

  7. Plant inspection tours with mobile data logging system

    International Nuclear Information System (INIS)

    Roesser, U.

    2006-01-01

    The MDE Mobile Data Logging System has been introduced in a number of German power plants for efficient logging, evaluation, and quality-assured documentation of data recorded on plant inspection tours by means of pocket PCs instead of slips of paper. It will be installed in other nuclear power plants in the near future. The MDE system is composed of the pocket PCs for logging data during plant inspection tours, the associated docking stations installed in the respective areas of application, one PC or, if necessary, several PCs with the appropriate user software, and the associated network links. To install the software in the power plant, lists of rooms and measurement stations as well as other positions on an inspection course are transmitted to the MDE system. When the system has been commissioned, inspection tours are planned in accordance with past experience and optimized in the computer. User experience is taken into account in program updates. New functions improve user comfort and ease of evaluation. Additions to the MDE software, and applications in other areas, are tentatively planned and will be implemented as the need arises. (orig.)

  8. In-service inspection as an aid to steel pressure vessel reliability

    International Nuclear Information System (INIS)

    Nichols, R.W.

    1975-01-01

    In-service inspection has played an important role in non-nuclear pressure vessel technology, being a legal requirement in many countries. Evidence from surveys of reliability of non-nuclear plant has suggested that such inspections can be effective in reducing the risk of subsequent failures. Recent requirements of the ASME XI code which will be summarised have important implications on the techniques to be used for in-service inspection, and so on design and fabrication aspects. Moreover, in-service inspection can only be an effective procedure if its possible weaknesses are recognised. The first problem is to ensure that an ultrasonic technique is used which is capable of detecting defects of an order of magnitude smaller than the critical size for each particular situation, in whatever defect orientation is important. The potential of different ultrasonic techniques will be compared. Next it is necessary to ensure coverage of all the relevant material. In this respect machine operation is superior to manual scanning, so that manipulation and scanning devices have to be developed. Problems of local geometry and of deviations in geometry have to be discussed with designer and fabricator; plate and clad quality have to be controlled (with respect to surface contour, metallurgical condition and freedom from interfering defects) to ensure inspectability in depth. The reliability of the mechanical and electronic equipment has to be assessed and designed to meet high requirements. Some presentational aids to detection and interpretation will be discussed. Having located a potential defect, the application of fracture mechanics treatments requires knowledge of size, shape and orientation. Some of the problems will be discussed together with possible solutions. (author)

  9. Inspection during the starting-up phase of nuclear power plants in Spain

    International Nuclear Information System (INIS)

    Figueras Clavijo, J.M.

    1977-01-01

    At present a construction permit in the frame of the Spanish Nuclear Programme has been granted for seven nuclear power plants and three of these have reached an advanced construction stage. The first part of the paper deals with the technical procedures to be followed for commissioning a nuclear power plant according to the provisions of the 1972 regulations on nuclear and radioactive installations. The second part discusses the problems related to conduct of in-service inspections. (NEA) [fr

  10. 7 CFR 301.87-7 - Assembly and inspection of regulated articles.

    Science.gov (United States)

    2010-01-01

    ... Animal and Plant Health Inspection Service, Plant Protection and Quarantine, Domestic and Emergency... regulated article. 8 Inspectors are assigned to local offices of Plant Protection and Quarantine, which are... PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE DOMESTIC QUARANTINE NOTICES Sugarcane...

  11. In service inspection of pipes based on risk methods; Inspeccion en servicio de tuberias basada en metodos de riesgo

    Energy Technology Data Exchange (ETDEWEB)

    Mendoza G, G.; Viais J, J.; Carmona C, M. [ININ, Centro Nuclear ' Dr. Nabor Carrillo Flores' , Carretera Mexico Toluca, S/N. La Marquesa, Ocoyoacac, Mexico, C. P. 52750 (Mexico)]. e-mail: gmg@nuclear.inin.mx

    2006-07-01

    The politics of the Nuclear Regulatory Commission (by its initials in English NRC) of the United States of America on the use of the Probabilistic Safety Analysis (PSA) in activities of nuclear regulation it foments the use of this analysis technique to improve the decisions making, to reduce the unnecessary work in maintenance aspects, inspection and tests and to improve the regulatory efficiency. The inspection programs in service (ISI by its initials in English) developed by the American Society of Mechanical Engineers (by its initials in English ASME) it has been the one primary mechanism to prove the mechanical equipment in plants of nuclear energy, these programs indeed have been carried out in plants of nuclear energy by more of two decades. Their purpose is to identify the conditions, such as indications of cracks that are precursory of flights and ruptures which violate the integrity principles of the pressure frontier. The inspection in service activities include ultrasonic tests, surface tests and penetrating liquids test, also activities that include the scaffolds construction, removal of insulations and welding polishing. The inspections in service every 18 months during the times outside of service are executed. One of the objectives is to lower the costs of the inspections during the times outside of service and to reduce the exposure to the radiation by part of the personnel during these times out for inspections, while it is increased or it maintains the personnel's safety and the reliability. As part of the methodology a pipe segment is selected for which a fault in any point has the same consequences, being calculated the fault probability of the tube using the dimensions of the segment. In this work the inspection in service methodology is applied based on risk to an aspersion system of low pressure of the Laguna Verde Nucleo electric Central. For this system a reduction in the number of welding to inspect of 103 to only 15 is obtained

  12. Remote inspection system for nuclear power plants

    International Nuclear Information System (INIS)

    Inagaki, K.; Fujii, M.; Doi, A.; Harima, T.

    1977-01-01

    A remote inspection system for nuclear power plants was constructed based on an analysis of inspections performed by an operator on patrol. This system consists of an operator's console and a remote station. The remote station, equipped with five kinds of sensors, is steered along the inspection route by a photoelectric guiding system or may be manually controlled from an operator's console in a main control room. Signals for control and inspection data are multiplexed and transmitted through a coaxial cable

  13. Remote operation and maintenance support services for nuclear power plants

    International Nuclear Information System (INIS)

    Yamamoto, Hiroki; Higuma, Koji; Shimizu, Shunichi; Sakuma, Masatake; Sonoda, Yukio; Kanemoto, Shigeru

    2004-01-01

    Toshiba Corporation constructed e-Toshiba Operating Plant Service (e-TOPS TM ) system and began remote operation and maintenance support service for nuclear power plants. The service put into practice remote operation and maintenance by harmony of information technologies such as internet and mobile, and nuclear power measurement/diagnostic technologies and security techniques. Outline of e-TOPS TM , remote-control service, -inspection system, -diagnostic service and technologies support service are explained. Construction, objects and application effects of e-TOPS TM , remote diagnostic system using image treatment techniques, construction of device record card control system are illustrated. (S.Y.)

  14. Development of bus duct inspection robot at nuclear power plant

    International Nuclear Information System (INIS)

    Hamada, Mamoru; Hoshi, Teruaki; Komura, Yoshinari

    2017-01-01

    Under the present situation, nuclear power plant has some places which are inspected with difficulty or not inspected due to narrowness or physical restriction, when carrying out periodical inspection. The subject of our research and development is to improve the accuracy of inspection and also to save labor (liberation from distress work of the worker) by applying a robot technology to the periodical inspection of the nuclear power plant. As a specific example, we report that developed robot can inspect inside the narrow space of Isolated Phase Bus ducts, which connect between a turbine generator and the main transformer. (author)

  15. X-ray tomographic in-service inspection of girth welds - The European project TomoWELD

    International Nuclear Information System (INIS)

    Ewert, Uwe; Redmer, Bernhard; Walter, David; Thiessenhusen, Kai-Uwe; Bellon, Carsten; Nicholson, P. Ian; Clarke, Alan L.; Finke-Härkönen, Klaus-Peter

    2015-01-01

    The new standard 'ISO 17636-2:2013: Non-destructive testing of welds - Radiographic testing - Part 2: X- and gamma-ray techniques with digital detectors', defines the practice for radiographic inspection of welded pipes for manufacturing and in-service inspection. It is applied in Europe for inspections of pipe welds in nuclear power plants as well as in chemical plants and allows a faster inspection with digital detector arrays (DDA) than with film. Nevertheless, it does not allow the evaluation of the depth and shape of volumetric and planar indications. In 2001 a planar tomography scanner, TomoCAR, was introduced for mechanized radiographic testing (RT) inspection and non-destructive measurement of cross sections. The project TomoWELD is based on a new concept of the scan geometry, an enhanced GPU based reconstruction, and the application of a new generation of photon counting DDAs based on CdTe crystal CMOS hybrids. The new detector permits the selection of energy thresholds to obtain an optimum energy range and reduction of the influence of scattered radiation. The concept and first measurements are presented. Flaw depth and shape of volumetric and planar irregularities can be determined

  16. X-ray tomographic in-service inspection of girth welds - The European project TomoWELD

    Energy Technology Data Exchange (ETDEWEB)

    Ewert, Uwe, E-mail: uwe.ewert@bam.de; Redmer, Bernhard, E-mail: uwe.ewert@bam.de; Walter, David, E-mail: uwe.ewert@bam.de; Thiessenhusen, Kai-Uwe, E-mail: uwe.ewert@bam.de; Bellon, Carsten, E-mail: uwe.ewert@bam.de [BAM Bundesanstalt für Materialforschung, Berlin (Germany); Nicholson, P. Ian, E-mail: ian.nicholson@twi.co.uk [TWI Technology Centre Wales, Port Talbot (United Kingdom); Clarke, Alan L. [TWI Technology Centre Wales, Port Talbot (United Kingdom); Finke-Härkönen, Klaus-Peter, E-mail: klaus.harkonen@ajat.fi [Oy AJAT Ltd., Helsinki (Finland)

    2015-03-31

    The new standard 'ISO 17636-2:2013: Non-destructive testing of welds - Radiographic testing - Part 2: X- and gamma-ray techniques with digital detectors', defines the practice for radiographic inspection of welded pipes for manufacturing and in-service inspection. It is applied in Europe for inspections of pipe welds in nuclear power plants as well as in chemical plants and allows a faster inspection with digital detector arrays (DDA) than with film. Nevertheless, it does not allow the evaluation of the depth and shape of volumetric and planar indications. In 2001 a planar tomography scanner, TomoCAR, was introduced for mechanized radiographic testing (RT) inspection and non-destructive measurement of cross sections. The project TomoWELD is based on a new concept of the scan geometry, an enhanced GPU based reconstruction, and the application of a new generation of photon counting DDAs based on CdTe crystal CMOS hybrids. The new detector permits the selection of energy thresholds to obtain an optimum energy range and reduction of the influence of scattered radiation. The concept and first measurements are presented. Flaw depth and shape of volumetric and planar irregularities can be determined.

  17. Automatic ultrasonic pre-service, and in-service inspection of pressurized components of the primary circuit of nuclear power stations

    International Nuclear Information System (INIS)

    Muller, G.P.; Hallermeier, L.; Heinrich, D.; Grabendorfer, W.; Rebrmann, M.

    1985-01-01

    Ultrasonic pre-service and especially in-service inspection activities on the primary circuit of nuclear power stations form an essential part of the maintenance work that must be performed throughout the lifetime to ensure plant integrity. Consequently, the equipment required to carry out these inspections must be continuously improved in respect of reliability, safety, accuracy and ease of handling in order to minimize disturbances and repairs and reduce radiation exposure of the personnel. The authors' discussion of technique, equipment and performance of automated ultrasonic inspection is based on 15 years of experience in the testing of components of the primary circuit in nuclear power stations. To cover all inspection areas of the RPV of a PWR, four different manipulators are required, two for the closure head, one for the studs and one for the cylindrical shell and bottom closure. The use of the newly developed equipment, which naturally meets all the recommendations of the licensing authorities, allows for the automatic inspection of the components of primary circuit of nuclear power stations and the thus helps to substantially decrease the radiation exposure of the personnel. All the manipulators and their control consoles were designed and manufactured by M.A.N., Nuremberg while the ultrasonic electronic system was developed by Krautkramer, Cologne

  18. Reactor safety through quality assurance and in-service inspection

    International Nuclear Information System (INIS)

    Bush, S.H.

    The quality assurance is discussed of nuclear power plant equipment with respect to the following regulations: section 50 10 CFR - supplement B, section NA-400, ASME - section III and ANSI N-54.2. Quality assurance and reliability are assessed with regard to two aspects: all preoperational functions and all operating stages of the power plant. During the production of nuclear power plant components, increased attention should be devoted to the choice of material, materials testing, production programme and to the production process. During power plant operation, care should be given to periodical in-service inspections which guarantee the plant reliability; defects should immediately be remedied or the power plant shut down. Emphasis is put on the tests of reactor welded joints in compliance with the ASME code. The results of operating tests are used as feedback in the design and testing of the components during production. The probabilities were calculated of the occurrence and elimination of defects during the manufacture and operation of a nuclear reactor. (J.B.)

  19. 7 CFR 301.91-7 - Assembly and inspection of regulated articles.

    Science.gov (United States)

    2010-01-01

    ... Inspectors are assigned to local offices of Plant Protection and Quarantine which are listed in telephone... Inspection Service, Plant Protection and Quarantine, Domestic and Emergency Operations, 4700 River Road Unit... PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE DOMESTIC QUARANTINE NOTICES European Larch...

  20. Activities in Support of Continuing the Service of Nuclear Power Plant Safety-Related Concrete Structures

    International Nuclear Information System (INIS)

    Naus, Dan J.

    2010-01-01

    Nuclear power plant concrete structures are described. In-service inspection and testing requirements in the U.S. are summarized. The license renewal process in the U.S. is outlined and its current status provided. Operating experience related to performance of the concrete structures is presented. Basic components of a program to manage aging of the concrete structures are identified and described: degradation mechanisms, damage models, and material performance; assessment and remediation (i.e., component selection, in-service inspection, non-destructive examinations, and remedial actions); and estimation of performance at present or some future point in time (i.e., application of structural reliability theory to the design and optimization of in-service inspection/maintenance strategies, and determination of the effects of degradation on plant risk). Finally, areas are noted where additional research would be of benefit to aging management of nuclear power plant concrete structures.

  1. ASTRID In Service Inspection and Repair: Review of R&D program and associated results

    International Nuclear Information System (INIS)

    Baqué, François; Jadot, Françoise; Bourdais, Florian le; Sibilo, Julien; Augem, Jean-Michel; Gastaldi, Olivier

    2013-01-01

    In Service Inspection & Repair (ISI&R): → range of provisions enabling to verify that the equipments state is in compliance with design criteria; → other range of provisions allowing to characterize an abnormal situation (failure, operation mistake) and to perform necessary actions to reach again an achievable plant configuration

  2. The ASME research task force on risk-based in-service inspection

    International Nuclear Information System (INIS)

    Balkey, K.R.; Chapman, O.J.V.

    1997-01-01

    The use of risk-based methods in the development of in-service inspection (ISI) and in-service testing (IST) programs for nuclear power plant and other industrial applications has been studied for the last several years through the American Society of Mechanical Engineers Centre for Research and Technology Development (ASME 1991, 1992, 1994, 1996). The results of this work are being used as a foundation to develop specific requirements for implementation of risk-based technology in ASME Codes and Standards, regulatory requirements and industry programs both in the U.S. and other countries. This paper provides a brief overview of the ASME Research Methodology and how it has been adapted for application to the inspection of piping within the USA. It also relates how the reliability of nondestructive examination (NDE) methods for pressure boundary components can impact the risk and discusses the relationship between this and NDE qualification/demonstration now being implemented in Europe and the USA. (orig.)

  3. Managing aging in nuclear power plants: Insights from NRC maintenance team inspection reports

    Energy Technology Data Exchange (ETDEWEB)

    Fresco, A.; Subudhi, M.; Gunther, W.; Grove, E.; Taylor, J. [Brookhaven National Lab., Upton, NY (United States)

    1993-12-01

    A plant`s maintenance program is the principal vehicle through which age-related degradation is managed. From 1988 to 1991, the NRC evaluated the maintenance program of every nuclear power plant in the United States. Forty-four out of a total of 67 of the reports issued on these in-depth team inspections were reviewed for insights into the strengths and weaknesses of the programs as related to the need to understand and manage the effects of aging on nuclear plant systems, structures, and components. Relevant information was extracted from these inspection reports and sorted into several categories, including Specific Aging Insights, Preventive Maintenance, Predictive Maintenance and Condition Monitoring, Post Maintenance Testing, Failure Trending, Root Cause Analysis and Usage of Probabilistic Risk Assessment in the Maintenance Process. Specific examples of inspection and monitoring techniques successfully used by utilities to detect degradation due to aging have been identified. The information also was sorted according to systems and components, including: Auxiliary Feedwater, Main Feedwater, High Pressure Injection for both BWRs and PWRs, Service Water, Instrument Air, and Emergency Diesel Generator Air Start Systems, and Emergency Diesel Generators Air Start Systems, emergency diesel generators, electrical components such as switchgear, breakers, relays, and motor control centers, motor operated valves and check valves. This information was compared to insights gained from the Nuclear Plant Aging Research (NPAR) Program. Attributes of plant maintenance programs where the NRC inspectors felt that improvement was needed to properly address the aging issue also are discussed.

  4. Utilization of aging program results in plant inspections

    International Nuclear Information System (INIS)

    Gunther, W.; Fullwood, R.

    1989-01-01

    Research conducted under the auspices of the US Nuclear Regulatory Commission Nuclear Plant Aging Research (NPAR) Program has resulted in a large data base of component and system operating experience. This data base has been used to determine equipment aging susceptibility and the potential for equipment aging to impact plant safety and reliability. Methods of detecting and mitigating component and system aging have also been identified. This paper discusses how the NPAR results could be used to focus inspection activities on age-sensitive components and systems and on the specific modes and mechanisms of age degradation. These activities range from the regular inspections conducted by resident inspectors to extensive special inspections such as the Safety System Functional Inspection typically conducted by a team of inspectors. 5 refs., 3 figs., 1 tab

  5. Utilization of aging program results in plant inspections

    International Nuclear Information System (INIS)

    Gunther, W.; Fullwood, R.

    1988-01-01

    Research conducted under the auspices of the US Nuclear Regulatory Commission Nuclear Plant Aging Research (NPAR) Program has resulted in a large data base of component and system operating experience. This data base has been used to determine equipment aging susceptibility and the potential for equipment aging to impact plant safety and reliability. Methods of detecting and mitigating component and system aging have also been identified. This paper discusses how the NPAR results could be used to focus inspection activities on age-sensitive components and systems and on the specific modes and mechanisms of age degradation. These activities range from the regular inspections conducted by resident inspectors to extensive special inspections such as the Safety System Functional Inspection typically conducted by a team of inspectors. 5 refs., 3 figs., 1 tab

  6. ASME development of risk-based inspection guidelines for nuclear power plants

    International Nuclear Information System (INIS)

    Gore, B.F.; Balkey, K.R.

    1992-08-01

    A methodology has been developed for use in preparing guidelines for the in-service inspection of nuclear power plant pressure boundary and structural components. This methodology is a further development of a general methodology previously published by the task force for application to any industry. It is unique in that it utilizes probabilistic risk assessment (PRA) information to improve the quantification of risks associated with component ruptures. A procedure has also been recommended for using the resulting quantified risk estimates to determine target component rupture probability values to be maintained by inspection activities. Characteristics which an inspection strategy must possess in order to maintain target rupture probabilities are being determined by structural risk and reliability analysis (SRRA) calculations. The major features of this methodology are described in this paper, and example applications are briefly discussed. Plans for additional work in developing and applying the methodology are described

  7. Surveillance and in-service inspection (SISI) program at FFTF

    International Nuclear Information System (INIS)

    Conrads, T.J.

    1980-01-01

    Assurance of the integrity of the sodium coolant pressure boundaries of the Fast Flux Test Facility systems and components is essential for safe operation. A program has been developed to monitor the integrity of the coolant boundaries and certain plant conditions. Specific equipment and features have been designed into the plant for monitoring. The purpose of SISI is to prevent failures or minimize their consequences through early detection. The program which administers the requirements for monitoring applicable plant conditions whose integrity is necessary to protect public health and safety is known as the Surveillance and In-service Inspection (SISI) Program. The SISI program utilizes a wide range of monitoring techniques to ensure that material degradation or structural deficiencies will not result in the loss of the ability to shut down the reactor, cool the reactor core, or cause the release of radioactive material to the environment

  8. The new French code for PWR in service inspection

    Energy Technology Data Exchange (ETDEWEB)

    Noel, R; Hutin, J P [Electricite de France (EDF), 75 - Paris (France)

    1988-12-31

    This document presents the new french code for pressured water reactor in service inspection. The historic regulatory basis is presented, together with the new regulatory act (dating back to the 26 february 1974) and the major guidelines of the french practice for in service inspection of PWR components. (TEC).

  9. In-service inspection methods for graphite-epoxy structures on commercial transport aircraft

    Science.gov (United States)

    Phelps, M. L.

    1981-01-01

    In-service inspection methods for graphite-epoxy composite structures on commercial transport aircraft are determined. Graphite/epoxy structures, service incurred defects, current inspection practices and concerns of the airline and manufacturers, and other related information were determind by survey. Based on this information, applicable inspection nondestructive inspection methods are evaluated and inspection techniques determined. Technology is developed primarily in eddy current inspection.

  10. Remote handling developments for inspection and repair of highly active reprocessing plant

    International Nuclear Information System (INIS)

    Jones, E.L.

    1988-01-01

    Having the capability to carry out regular and comprehensive inspection of active plant can have benefits beyond the need to satisfy the possible requirements of National Regulatory Authorities. Intermediate inspection can provide qualitative data on the state of the plant, whilst regular inspection can provide quantitative data on which to base predictive judgments. Information of this sort can allow confidence in predicting the actual life of the plant as opposed to the theoretical. The following paper addresses the areas of plant inspection and repair by reference to specific projects either already completed or at an advanced stage of development at BNFL's Sellafield reprocessing plant. (author)

  11. PROMSYS, Plant Equipment Maintenance and Inspection Scheduling

    International Nuclear Information System (INIS)

    Morgan, D.L.; Srite, B.E.

    1986-01-01

    1 - Description of problem or function: PROMSYS is a computer system designed to automate the scheduling of routine maintenance and inspection of plant equipment. This 'programmed maintenance' provides the detailed planning and accomplishment of lubrication, inspection, and similar repetitive maintenance activities which can be scheduled at specified predetermined intervals throughout the year. The equipment items included are the typical pumps, blowers, motors, compressors, automotive equipment, refrigeration units, filtering systems, machine shop equipment, cranes, elevators, motor-generator sets, and electrical switchgear found throughout industry, as well as cell ventilation, shielding, containment, and material handling equipment unique to nuclear research and development facilities. Four related programs are used to produce sorted schedule lists, delinquent work lists, and optional master lists. Five additional programs are used to create and maintain records of all scheduled and unscheduled maintenance history. 2 - Method of solution: Service specifications and frequency are established and stored. The computer program reviews schedules weekly and prints, on schedule cards, instructions for service that is due the following week. The basic output from the computer program comes in two forms: programmed-maintenance schedule cards and programmed-maintenance data sheets. The data sheets can be issued in numerical building, route, and location number sequence as equipment lists, grouped for work assigned to a particular foreman as the foreman's equipment list, or grouped by work charged to a particular work order as the work-order list. Data sheets grouped by equipment classification are called the equipment classification list

  12. In service inspection of SUPERPHENIX 1 vessels: MIR

    International Nuclear Information System (INIS)

    Asty, M.; Viard, J.; Lerat, B.; Saglio, R.

    1985-01-01

    Although no in-service inspection constraints were imposed on the Phenix vessels, the Safety Authorities asked that the design of SUPERPHENIX 1 makes it possible to monitor throughout the lifetime of the reactor, surface and internal defects on the main vessel. A pool design and the presence of heat baffles inside the main vessel make access from the inside of the vessel impossible. Thus, an inspection can only be performed from the outside of the main vessel: the distance between the walls of the main and safety vessels is such that an inspection device can be introduced into the corresponding space. As the design of the reactor precludes radiographic inspection, the method which was selected for monitoring internal defects in the main vessel is ultrasonics. However, the anisotropic structure of austenitic stainless steel welds limits the performance of this technique. The authors present the in-service inspection device, MIR, which has been specially developed for the visual and ultrasonic examination of SUPERPHENIX 1 vessels

  13. Study on in-service inspection and repair program and related plant design for Japan Sodium-Cooled Fast Reactor (JSFR)

    International Nuclear Information System (INIS)

    Kubo, Shigenobu; Suzuki, Shinichi; Kotake, Shoji; Nishiyama, Noboru; Uzawa, Masayuki

    2011-01-01

    Maintenance and repair program and conformity with them were investigated as a part of the conceptual design study of Japan Sodium-cooled Fast Reactor (JSFR). The maintenance program was set by taking the feature of sodium-cooled reactors and domestic practice of LWRs into account. Both of regulatory required inspection and voluntary inspection, which are conducted in the domestic LWRs, were counted. The regulatory required ISI program was based on that of the previous Japanese SFRs, LWRs (JSME S NA1) and liquid metal cooled reactors (ASME section XI division 3). Parts to be inspected, methods of inspection were identified for major structures and components. Concerning the repair program, we set three levels of repair requirements based on estimated frequency of defect and failure during the plant life time. For level 1, which might be occur several times during the plant life time, it is required to be easily repaired in a short period. Access routes and working space are considered in the component design and its arrangement. For level 2, which might be unlikely to occur during the plant life time, it is required to check that the repair work is feasible in a practical time range. For level 3, which frequency is negligible small, repair is not taken into account but the feasibility was investigated. The plant design shall be done so that all of above mentioned inspection and repair can be conducted. It is desired to ensure accessibility for all of the coolant and cover gas boundaries and the internal structures in order to cope with unforeseen troubles. Access routes for the reactor vessel and its internal structures, piping, pumps and intermediate heat exchangers and steam generators were investigated. As the results of that, possible ways for implementation of the maintenance and repair were identified. (author)

  14. The Expert System Application For Inspection Of The Power Plants

    International Nuclear Information System (INIS)

    Josowidagdo, L.

    1997-01-01

    This paper describes the application of expert system to evaluate and consider the problem encountered in this fields are complex and time consuming. As as example several factors affecting system voltage selections are load magnitude, distance from the main power supply, safety, standards, cost of utilization and service system equipment, and future load growth. The inspection deal with interactions between alternatives, uncertainties, and important non financial parameter. Several complex problems are multiple objective functions, multiple constraints, complex system interactions, the need for accuracy, the need for trade off, optimization, and coordination of the decision making process. ASDEP is one of the expert system for electric power plant design that describe the application of the artificial intelligence to design of a power plan's electrical auxiliary system. In this circumstance this paper will elaborate another aspect for using the expert system in the inspection

  15. B Plant treatment, storage, and disposal (TSD) units inspection plan

    International Nuclear Information System (INIS)

    Beam, T.G.

    1996-01-01

    This inspection plan is written to meet the requirements of WAC 173-303 for operations of a TSD facility. Owners/operators of TSD facilities are required to inspection their facility and active waste management units to prevent and/or detect malfunctions, discharges and other conditions potentially hazardous to human health and the environment. A written plan detailing these inspection efforts must be maintained at the facility in accordance with Washington Administrative Code (WAC), Chapter 173-303, ''Dangerous Waste Regulations'' (WAC 173-303), a written inspection plan is required for the operation of a treatment, storage and disposal (TSD) facility and individual TSD units. B Plant is a permitted TSD facility currently operating under interim status with an approved Part A Permit. Various operational systems and locations within or under the control of B Plant have been permitted for waste management activities. Included are the following TSD units: Cell 4 Container Storage Area; B Plant Containment Building; Low Level Waste Tank System; Organic Waste Tank System; Neutralized Current Acid Waste (NCAW) Tank System; Low Level Waste Concentrator Tank System. This inspection plan complies with the requirements of WAC 173-303. It addresses both general TSD facility and TSD unit-specific inspection requirements. Sections on each of the TSD units provide a brief description of the system configuration and the permitted waste management activity, a summary of the inspection requirements, and details on the activities B Plant uses to maintain compliance with those requirements

  16. Development of the Risk-Based Inspection Techniques and Pilot Plant Activities

    International Nuclear Information System (INIS)

    Phillips, J.H.

    1997-01-01

    Risk-based techniques have been developed for commercial nuclear power plants. System boundaries and success criteria is defined using the probabilistic risk analysis or probabilistic safety analysis developed to meet the individual plant evaluation. Final ranking of components is by a plant expert panel similar to the one developed for maintenance rule. Components are identified as being high risk-significant or low-risk significant. Maintenance and resources are focused on those components that have the highest risk-significance. The techniques have been developed and applied at a number of pilot plants. Results from the first risk-based inspection pilot plant indicates that safety due to pipe failure can be doubled while the inspection reduced to about 80% when compared with current inspection programs. The reduction in inspection reduces the person-rem exposure resulting in further increases in safety. These techniques have been documented in publication by the ASME CRTD

  17. Development of automatic inspection robot for nuclear power plants

    International Nuclear Information System (INIS)

    Yamada, K.; Suzuki, K.; Saitoh, K.; Sakaki, T.; Ohe, Y.; Mizutani, T.; Segawa, M.; Kubo, K.

    1987-01-01

    This robot system has been developed for automatic inspection of nuclear power plants. The system configuration is composed of vehicle that runs on monorail, the sensors on the vehicle, an image processer that processes the image information from the sensors, a computer that creates the inspection planning of the robot and an operation panel. This system has two main features, the first is the robot control system. The vehicle and the sensors are controlled by the output data calculated in the computer with the three dimensional plant data. The malfunction is recognized by the combination of the results of image processing, information from the microphone and infrared camera. Tests for a prototype automatic inspection robot system have been performed in the simulated main steam piping room of a nuclear power plant

  18. New approach for risk based inspection of H2S based Process Plants

    International Nuclear Information System (INIS)

    Vinod, Gopika; Sharma, Pavan K.; Santosh, T.V.; Hari Prasad, M.; Vaze, K.K.

    2014-01-01

    Highlights: • Study looks into improving the consequence evaluation in risk based inspection. • Ways to revise the quantity factors used in qualitative approach. • New approach based on computational fluid dynamics along with probit mathematics. • Demonstrated this methodology along with a suitable case study for the said issue. - Abstract: Recent trend in risk informed and risk based approaches in life management issues have certainly put the focus on developing estimation methods for real risk. Idea of employing risk as an optimising measure for in-service inspection, termed as risk based inspection, was accepted in principle from late 80s. While applying risk based inspection, consequence of failure from each component needs to be assessed. Consequence evaluation in a Process Plant is a crucial task. It may be noted that, in general, the number of components to be considered for life management is very large and hence the consequence evaluation resulting from their failures (individually) is a laborious task. Screening of critical components is usually carried out using simplified qualitative approach, which primarily uses influence factors for categorisation. This necessitates logical formulation of influence factors and their ranges with a suitable technical basis for acceptance from regulators. This paper describes application of risk based inspection for H 2 S based Process Plant along with the approach devised for handling the influence factor related to the quantity of H 2 S released

  19. New developments in containment in-service inspection requirements

    International Nuclear Information System (INIS)

    Staffiera, J.E.

    1995-01-01

    Section 11 of the ASME Boiler and Pressure Vessel Code contains requirements for inservice inspection of nuclear power plant components. Development of ASME Code requirements for containment inservice inspection was begun in 1977, and in 1979 the first such requirements were published in the form of Code Case N-236. Formal inclusion of these requirements in Section 11 of the ASME Code occurred with publication of Subsection IWE, ''Rules for inservice Inspection of Class MC Components of Nuclear Power Plants,'' in the 1980 Edition, Winter 1981 Addenda. At that time, inspection emphasis on nuclear power construction and operation activities was placed on welds and welding processes associated with steel containments and metallic liners of concrete containments. The need for repair-welding requirements was necessitated by containment design modifications for conditions not considered in several original plant designs. Welds in steel containments and metallic liners of concrete containments have not required significant amounts of repair, however, degradation of base metal in containments has become a major concern. Various degradation mechanisms have been identified as potential causes of damage to containment surfaces, including fatigue, corrosion and material embrittlement due to long-term radiation exposure. As a result of these concerns, and in response to comments generated by the Committee to Review Generic Requirements (CRGR) of the NRC in its review of Subsection IWE, emphasis on weld-based inservice inspection was redirected toward a containment-surface inservice inspection program. Significant changes were made to accommodate this re-emphasis. The majority of these changes were published in the 1992 Edition, with the 1992 Addenda, of Subsection IWE. The NRC Proposed Rulemaking was issued for a 75-day public comment period in January, 1994. This period was extended at the request of nuclear industry organizations to allow for meaningful evaluation

  20. Guided wave technology for in-service inspection and online monitoring for long term operation of nuclear power plants

    International Nuclear Information System (INIS)

    Bertoncini, Francesco; Raugi, Marco; Cappelli, Mauro; Cordella, Francesco; Mazzini, Davide

    2015-01-01

    In-Service Inspection (ISI) and monitoring of all equipment (Systems, Structures and Components, SSCs) of a Nuclear Power Plant (NPP), are actions aimed at preventing failures both for economical and safety purposes. SSCs ageing due to stresses such as corrosion, load variations, flow conditions, temperature and neutron irradiation can be a potential limit for NPP life extension or operation beyond their license term (Long Term Operation. LTO). ISI has a main role on the actual possibility of LTO assuring the required safety. Guided Waves are structure-borne ultrasonic waves that propagate along the structure confined and guided by its geometric boundaries. Guided Wave Testing can find defect locations through long-range screening using low-frequency waves (from 5 to 250 kHz). The technology is regularly used for pipe testing in the oil and gas industry. In the nuclear industry, regulators are working to standardize monitoring and inspection procedures. To use the technology inside an active plant, operators must solve issues like high temperatures (up to more than 300degC inside a light-water reactor's primary piping), high wall thickness of components in the primary circuit and characteristic defect typologies. Magnetostrictive sensors are expected to overcome such issues due to their physical properties, namely robust constitution and simplicity. Recent experimental results have demonstrated magnetostrictive transducers can withstand temperatures close to 300degC. In this paper, new experimental tests conducted using such a methodology will be described and open issues related to high temperature guided wave applications (e.g. wave velocity or amplitude fluctuations during propagation in variable temperature components) will be discussed. (author)

  1. Designing for in-service inspection

    International Nuclear Information System (INIS)

    Dixit, K.B.

    2002-01-01

    The process of design of components, equipment and systems normally focuses on functional requirements, integrity and environmental conditions. Manufacturing processes, fabricability, inspectability and maintainability in service are considered while designing. Provisions for the requirements of ISI also need to be given due consideration while designing the systems, equipment and components

  2. The development of in-cell remote inspection system in Tokai reprocessing plant

    International Nuclear Information System (INIS)

    Ishibashi, Yuzo

    1985-01-01

    In the Tokai fuel reprocessing plant, the containment is triple, i.e. the vessel containing radioactive material, then the concrete cell structure and finally the housing building. The fuel reprocessing plant is now proceeding with the development of an in-cell remote inspection system. The inspection system is for inspection of the cell itself and the equipment etc. in the cell, concerning the integrity. Described are the following: the course taken and problems in development of the remote inspection system; development of the floor rambling type remote inspection equipment and the multiple armed type, both for inspection of in-cell ''drip trays''; in-cell equipment inspection devices in specifications etc.; problems in its future development. (Mori, K.)

  3. 9 CFR 352.6 - Denial or withdrawal of inspection service.

    Science.gov (United States)

    2010-01-01

    ... improper means; (4) has knowingly represented that any exotic animal carcass, or exotic animal product, has... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Denial or withdrawal of inspection service. 352.6 Section 352.6 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF...

  4. Report on the Regulatory Experience of Risk-Informed In-service Inspection of Nuclear Power Plant Components and Common Views (consensus document)

    International Nuclear Information System (INIS)

    2004-08-01

    The present report represents the work product of the activities conducted by the Task Force. The TF performed a review and inventory of the existing approaches to risk-informed inservice inspection and testing, and completed its work in 1999 with a Current Practices Document 2, titled Report on risk-informed in-service inspection and in-service testing (EUR 19153 EN). In November 2001, the NRWG held a Special session on risk-informed applications, with emphasis on risk-informed inservice inspection, where results and experiences from pilot studies on risk-informed inservice inspection (RI-ISI), performed in several European countries, were presented and discussed. As a follow-up in May 2002, the TF was reconvened with the objectives to analyse from the regulatory point of view key aspects associated with the application of risk-informed inservice inspection, and to go beyond a state of the art report, presenting a series of recommendations of good practices or common positions reached by the regulators represented in the Task Force. (author)

  5. In service inspection of superphenix 1 vessels: MIR

    International Nuclear Information System (INIS)

    Asty, M.; Viard, J.; Lerat, B.; Saglio, R.

    1985-02-01

    Presentation of the in-service inspection device, MIR, which has been specially developed for the visual and ultrasonic examination of Super Phenix 1 vessels (surface and internal defects). The inspections take place during fuel handling operations. The inspection device is a robot with a four-wheel drive vehicle which guidance along the welds is achieved by eddy-current devices; visual examination is performed by a television camera and ultrasonic probes are specially resistent to high temperatures

  6. Proposals for in-service inspection and monitoring of selected components located within or part of the primary containment of sodium cooled fast reactors

    International Nuclear Information System (INIS)

    Bolt, P.R.

    1976-01-01

    Design and operational experience of CEGB gas cooled reactors and certain overseas reactor plant is reviewed in relation to in-service inspection and monitoring capabilities. Design guidelines and preliminary proposals are given for in-service inspection and monitoring of selected components located within or part of the primary containment of sodium cooled fast reactors. Specific comments are made on the items of further design and development work believed to be necessary

  7. MINAC, A new radiographic inspection capability

    International Nuclear Information System (INIS)

    Lapides, M.E.; Schonberg, R.

    1983-01-01

    In service, radiographic inspection of thick section, metallic components has historically been limited to the capabilities of radioisotopic sources such as cobalt and iridium. Although practical in many applications, these sources tend to be restricted by output intensity, by resolution obtainable, and by the physical size and weight of necessary transport shielding. In nuclear plant applications, any radiography is also frequently inhibited by the presence of a radiation background from activated corrosion products on the inspection object which may fog the film before the desired exposure is achieved. In recognition of these limitations and the need for improved capability in the conduct of mandated ten-year inspection of U.S. nuclear plant components such as reactor coolant pumps, pressure vessel nozzles and valve bodies, the Electric Power Research Institute (EPRI) undertook the development of a high energy, X-ray device appropriate for in service inspection of thick section (up to approximately 30 cm of steel) components. The development was conducted by Schonberg Radiation (U.S.A). The product, MINAC, a miniaturized linear accelerator system, has been in use in many plant inspections since April 1981. This paper describes the development and typical applications of MINAC

  8. In-service inspection robot for PFBR main vessel- concept

    Energy Technology Data Exchange (ETDEWEB)

    Rajendran, S; Ramakumar, M S [Bhabha Atomic Research Centre, Mumbai (India). Div. of Remote Handling and Robotics

    1994-12-31

    In-service inspection (ISI) of critical components in a nuclear reactor is one of the foremost and important tasks which reveals the state of health of the system, thereby ensuring the safety of the plant, personnel and environment. Prototype Fast Breeder Reactor (PFBR) is designed as a pool type reactor. A safety vessel is provided in the design which envelopes the main reactor vessel. The ISI of the main vessel is mandatory and will be carried out by a robot which will operate on this annular gap. The design of the robot is such that it can crawl around the vessel and into the gap at the bottom of the vessel relying on friction grip. The mobile robot will carry a CCTV camera and the inspection technique packages into the interspace, position and orient these to carry out the ISI of the main vessel. The paper discusses about the design features of the robot including the gripping mechanism and the crawling sequence to perform ISI of the reactor vessel. 3 figs.

  9. In-service inspection robot for PFBR main vessel- concept

    International Nuclear Information System (INIS)

    Rajendran, S.; Ramakumar, M.S.

    1994-01-01

    In-service inspection (ISI) of critical components in a nuclear reactor is one of the foremost and important tasks which reveals the state of health of the system, thereby ensuring the safety of the plant, personnel and environment. Prototype Fast Breeder Reactor (PFBR) is designed as a pool type reactor. A safety vessel is provided in the design which envelopes the main reactor vessel. The ISI of the main vessel is mandatory and will be carried out by a robot which will operate on this annular gap. The design of the robot is such that it can crawl around the vessel and into the gap at the bottom of the vessel relying on friction grip. The mobile robot will carry a CCTV camera and the inspection technique packages into the interspace, position and orient these to carry out the ISI of the main vessel. The paper discusses about the design features of the robot including the gripping mechanism and the crawling sequence to perform ISI of the reactor vessel. 3 figs

  10. Remote controlled ultrasonic pre-service and in-service inspections of reactor pressure vessels

    International Nuclear Information System (INIS)

    Mueller, G.

    1990-01-01

    The first mechanised in-service inspection of the reactor pressure vessel on unit one of Eskom's Koeberg nuclear power station has been carried out. Since 1968 a whole range of manipulators to carry out remote controlled ultrasonic inspections of nuclear power station equipment has been developed. The inspection of a reactor pressure vessel using a central mast manipulator is described. 3 figs., 1 ill

  11. Evaluation of robotic inspection systems at nuclear power plants

    International Nuclear Information System (INIS)

    White, J.R.; Eversole, R.E.; Farnstrom, K.A.; Harvey, H.W.; Martin, H.L.

    1984-03-01

    This report presents and demonstrates a cost-effective approach for robotics application (CARA) to surveillance and inspection work in existing nuclear power plants. The CARA was developed by the Remote Technology Corporation to systematically determine the specific surveillance/inspection tasks, worker hazards, and access or equipment placement restraints in each of the many individual rooms or areas at a power plant. Guidelines for designing inspection robotics are included and are based upon the modular arrangement of commercially-available sensors and other components. Techniques for maximizing the cost effectiveness of robotics are emphasized in the report including: selection of low-cost robotic components, minimal installation work in plant areas, portable systems for common use in different areas, and standardized robotic modules. Factors considered as benefits are reduced radiation exposure, lower man-hours, shorter power outage, less waste material, and improved worker safety concerns. A partial demonstration of the CARA methodology to the Sequoyah (PWR) and Browns Ferry (BWR) Plants is provided in the report along with specific examples of robotic installations in high potential areas

  12. Northeast Inspection Services, Inc. boresonic inspection system evaluation

    International Nuclear Information System (INIS)

    Nottingham, L.D.; Sabourin, P.F.; Presson, J.H.

    1993-04-01

    Turbine rotor reliability and remaining life assessment are continuing concerns to electric utilities. Over the years, boresonic inspection and evaluation have served as primary components in rotor remaining life assessment. Beginning with an evaluation of TREES by EPRI in 1982, a series of reports that document the detection and sizing capabilities of several boresonic systems have been made available. These studies should provide utilities with a better understanding of system performance and lead to improved reliability when predicting rotor remaining life. In 1990, the procedures followed for evaluating rotor boresonic performance capabilities were changed to transfer a greater portion of the data analysis function to the participating vendor. This change from previous policy was instituted so that the evaluation results would better reflect the ''final answer'' that a vendor would provide in a real rotor inspection and also to reduce the cost of an evaluation. Among the first vendors to participate in the new performance demonstration was Northeast Inspection Services, Inc. (NISI). The tests reported herein were conducted by NISI personnel under the guidelines of the new plan. Details of the new evaluation plan are also presented. Rotor bore blocks containing surface-connected fatigue cracks, embedded glass beads, and embedded radial-axial oriented disks were used in the evaluation. Data were collected during twenty-five independent passes through the blocks. The evaluation consisted of statistical characterization of the detection capabilities, flaw sizing and location accuracy, and repeatability of the inspection system. The results of the evaluation are included in this report

  13. Nuclear reactor capable of electric power generation during in-service inspection

    International Nuclear Information System (INIS)

    Nakamura, Shinsuke; Nogami, Hitoshi.

    1992-01-01

    The nuclear power plant according to the present invention can generate electric power even in a period when one of a pair of reactors is put to in-service inspection. That is, the nuclear power plant of the present invention comprises a system constitution of two nuclear reactors each of 50% thermal power and one turbine power generator of 100% electric power. Further, facilities of various systems relevant to the two reactors each of 50% thermal power, as a pair, are used in common as much as possible in order to reduce the cost for construction and maintenance/ inspection. Further, a reactor building and a turbine building disposed in adjacent with each for paired two reactors each of 50% thermal power are arranged vertically. This arrangement can facilitate the common use of the facilities for various systems and equipments to attain branching and joining of fluids in reactor feed water systems and main steam system pipelines easily with low pressure loss and low impact shocks. The facility utilization factor of such reactors is remarkably improved by doubling the period of continuous power generation. As a result, economic property is remarkably improved. (I.S.)

  14. Typical NRC inspection procedures for model plant

    International Nuclear Information System (INIS)

    Blaylock, J.

    1984-01-01

    A summary of NRC inspection procedures for a model LEU fuel fabrication plant is presented. Procedures and methods for combining inventory data, seals, measurement techniques, and statistical analysis are emphasized

  15. 78 FR 41866 - Restructuring of Regulations on the Importation of Plants for Planting

    Science.gov (United States)

    2013-07-12

    ... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service 7 CFR Parts 319 and 340 [Docket No. APHIS-2008-0011] RIN 0579-AD75 Restructuring of Regulations on the Importation of Plants for Planting AGENCY: Animal and Plant Health Inspection Service, USDA. ACTION: Proposed rule; reopening of...

  16. 7 CFR 944.400 - Designated inspection services and procedure for obtaining inspection and certification of...

    Science.gov (United States)

    2010-01-01

    ... Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing Agreements and Orders; Fruits, Vegetables... Agricultural Marketing Agreement Act of 1937, as amended. (a) The Federal or Federal-State Inspection Service, Fruit and Vegetable Division, Agricultural Marketing Service, United States Department of Agriculture is...

  17. Joint inspection of services for people with learning disabilities in Scotland: compliance or commitment?

    Directory of Open Access Journals (Sweden)

    Martin Campbell

    2006-10-01

    Full Text Available Purpose: The article describes the development of a practical model of joint, integrated inspection of managed care services for people with learning disabilities in Scotland. The model will give a reliable measure of the impact services are making to people's lives and the quality of service that individuals are actually receiving. Context of case: At present health, social services and education services for people with learning disabilities in Scotland are inspected separately, by up to nine different agencies. The first joint, integrated inspections of all services for people with learning disabilities in Scotland will take place in 2006. This is the first inspection of its kind in the UK, and the first to involve carers and people with learning disabilities on the inspection team. Data sources: Quality Outcome Indicators were developed in 21 different areas, or domains. Evidence based best practice, and evaluative data from previous inspections were the primary sources of data. Case description: This paper reviews the background and rationale for the integrated, joint inspection process. Strengths and constraints of this approach to inspection are discussed, including the crucial importance of commitment from services and from inspectors, rather than mere compliance with demands. Some guidance on how to fully involve staff, carers and services users in the inspection process is given. Conclusions and discussion: The model will produce data to inform decision-making for managers in integrated services and give services users clear information about how well local needs are being met, what areas need development, and what capacity the organisations have to improve. The model of inspection may be of interest to practitioners in a national and international context. The model will be evaluated, following the first joint inspection.

  18. Thermographic Inspections And The Residential Conservation Service Program (RCS)

    Science.gov (United States)

    Ward, Ronald J.

    1983-03-01

    Rhode Islanders Saving Energy (RISE) is a non-profit corporation founded in 1977 to provide Rhode Island residents with a variety of energy conservation services. Since January of 1981, it has been performing energy audits in compliance with the Department of Energy's (DOE) Residential Conservation Service Program (RCS). One aspect of the RCS program is the performance of inspections on energy conservation activities completed according to RCS installation guidelines. This paper will describe both the use and results of thermographic inspections within the RISE program. The primary objective of these inspections has been to assure the quality of the building envelope after completion of retrofit measures. Thermal anamolies have been detected that vary in size, location and probable cause. Approximately 37% of all jobs performed through RISE in conjunction with the RCS program have required remedial work as a result of problems that were identi-fied during the thermographic inspection. This percentage was much higher when infra-red inspections were conducted on "Non-RCS" retrofits. Statistics will be presented that provide an interesting insight on the quality of retrofit work when performed in associa-tion with a constant inspection process.

  19. B Plant Complex generator dangerous waste storage areas inspection plan: Revision 1

    International Nuclear Information System (INIS)

    Beam, T.G.

    1994-01-01

    This document contains the inspection plan for the <90 day dangerous/mixed waste storage areas and satellite accumulation areas at B Plant Complex. This inspection plan is designed to comply with all applicable federal, state and US Department of Energy-Richland Operations Office training requirements. In particular, the requirements of WAC 173-303 ''Dangerous Waste Regulations'' are met by this inspection plan. This inspection plan is designed to provide B Plant Complex with the records and documentation showing that the waste storage and handling program is in compliance with applicable regulations. The plan also includes the requirements for becoming a qualified inspector of waste storage areas and the responsibilities of various individuals and groups at B Plant Complex

  20. Inspection of Nuclear Power Plant Structures - Overview of Methods and Related Applications

    International Nuclear Information System (INIS)

    Naus, Dan J.

    2009-01-01

    The objectives of this limited study were to provide an overview of the methods that are available for inspection of nuclear power plant reinforced concrete and metallic structures, and to provide an assessment of the status of methods that address inspection of thick, heavily-reinforced concrete and inaccessible areas of the containment metallic pressure boundary. In meeting these objectives a general description of nuclear power plant safety-related structures was provided as well as identification of potential degradation factors, testing and inspection requirements, and operating experience; methods for inspection of nuclear power plant reinforced concrete structures and containment metallic pressure boundaries were identified and described; and applications of nondestructive evaluation methods specifically related to inspection of thick-section reinforced concrete structures and inaccessible portions of containment metallic pressure boundaries were summarized. Recommendations are provided on utilization of test article(s) to further advance nondestructive evaluation methods related to thick-section, heavily-reinforced concrete and inaccessible portions of the metallic pressure boundary representative of nuclear power plant containments. Conduct of a workshop to provide an update on applications and needed developments for nondestructive evaluation of nuclear power plant structures would also be of benefit.

  1. Inspection of Nuclear Power Plant Structures - Overview of Methods and Related Applications

    Energy Technology Data Exchange (ETDEWEB)

    Naus, Dan J [ORNL

    2009-05-01

    The objectives of this limited study were to provide an overview of the methods that are available for inspection of nuclear power plant reinforced concrete and metallic structures, and to provide an assessment of the status of methods that address inspection of thick, heavily-reinforced concrete and inaccessible areas of the containment metallic pressure boundary. In meeting these objectives a general description of nuclear power plant safety-related structures was provided as well as identification of potential degradation factors, testing and inspection requirements, and operating experience; methods for inspection of nuclear power plant reinforced concrete structures and containment metallic pressure boundaries were identified and described; and applications of nondestructive evaluation methods specifically related to inspection of thick-section reinforced concrete structures and inaccessible portions of containment metallic pressure boundaries were summarized. Recommendations are provided on utilization of test article(s) to further advance nondestructive evaluation methods related to thick-section, heavily-reinforced concrete and inaccessible portions of the metallic pressure boundary representative of nuclear power plant containments. Conduct of a workshop to provide an update on applications and needed developments for nondestructive evaluation of nuclear power plant structures would also be of benefit.

  2. Inspection maintenance and planning of shutdown in thermal electric generating plants

    International Nuclear Information System (INIS)

    Dezordi, W.L.; Correa, D.A.; Kina, M.

    1984-01-01

    The schedule shutdown of an industrial plant and, more specifically, of an electrical generating station, is becoming increasingly important. The major parameters to be taken into account for the planning of such a shutdown are basically of economic-financial nature such as costs of the related services (materials, equipment, manpower, etc), loss of revenue caused by the station's shutdown as well as by the station availability, and other requirements expected from it by the Load Dispatch and consumers. Improving the equipment's performances and the station's availability are the fundamental objectives to be strived for. The authors present in this paper, in an abridged form, the planning tools used for thermal electric generating plants shutdowns for inspections, maintenance and design changes implementation. (Author) [pt

  3. Integrated inspection of services for people with learning disabilities in Scotland: the way forward?

    Directory of Open Access Journals (Sweden)

    Martin Campbell

    2007-10-01

    Full Text Available Purpose: The article summarises the process and the results of the first, integrated inspection of managed care services for people with learning disabilities in Scotland. The multi-agency model used was developed to be congruent with the existing performance inspection models, used by single agency inspection. The inspection activities and main outcomes are described, and suggestions are made for improvements. Context of case: In 2006 an inspection model was devised to assess the quality of health, social services and education services for people with learning disabilities in one geographical area of Scotland, as a precursor to a programme of inspections nationally. The first joint, integrated inspection of all services for people with learning disabilities in Scotland took place in June 2006, and the report was published in March 2007. This was the first multi-agency inspection of its kind in the UK, and the first to involve carers and people with learning disabilities on the inspection team. Data sources: A number of data sources were used to check existing practice against agreed Quality Outcome indicators. Primary sources of data were social work records, health records, education records, staff surveys, carer surveys, interviews with staff, family carers and people with learning disabilities, and self evaluations completed by the services being inspected. Eleven different domains, each with sub-indicators were investigated. Case description: This paper summarises the process of an integrated, multi-agency inspection, how the inspection activities were conducted and the main findings of this inspection. Practical improvements to the process are suggested, and these may be of use to other services and inspectorates. Conclusions and discussion: The integrated inspection was a qualified success. Most major objectives were achieved. The sharing of data amongst inspection agencies, establishing the level of commitment to integrated inspection

  4. Qualification of NDT systems for in-service inspections of nuclear power plant pressure vessels

    International Nuclear Information System (INIS)

    Elfving, K.

    1998-11-01

    The goal of this study is to determine the requirements of the in-service inspection qualification in Europe, their feasibility in practice and to find out possible manufacture defects in test pieces used in practical trials. The literature study consists of qualification requirements set by European regulatory bodies and by the European nuclear power utilities. Also a brief summary of qualification requirements set by ASME Code, Section XI and comparison between ASME and European qualification requirements is included

  5. Regulatory inspection of nuclear power plants in NEA member countries

    International Nuclear Information System (INIS)

    Gronow, W.S.; Ilani, O.

    1977-01-01

    The increasing use of nuclear power and public interest in the safety controls led to the proposal by the sub-Committe on Licensing of the NEA Committee on the Safety of Nuclear Installations for a specialist meeting on regulatory inspection practices. This report which was prepared at the request of the sub-Committee to assist in the exchange of views and experience at the meeting reviews the response to a questionnaire on the systems employed, the scope and objectives and the effort involved in regulatory inspection throughout all stages of the life of a nuclear power plant. Other aspects of regulatory inspection activities are discussed including documentation, procedures for changes in technical specification and modifications to plant, powers and duties of regulatory inspection personnel and actions to be taken in the event of an accident or emergency. The report concludes with some comments on those aspects of regulatory inspection practices where further information and an exchange of experience might prove to be beneficial to Member countries. (author)

  6. Verification tests for remote controlled inspection system in nuclear power plants

    International Nuclear Information System (INIS)

    Kohno, Tadaaki

    1986-01-01

    Following the increase of nuclear power plants, the total radiation exposure dose accompanying inspection and maintenance works tended to increase. Japan Power Engineering and Inspection Corp. carried out the verification test of a practical power reactor automatic inspection system from November, 1981, to March, 1986, and in this report, the state of having carried out this verification test is described. The objects of the verification test were the equipment which is urgently required for reducing radiation exposure dose, the possibility of realization of which is high, and which is important for ensuring the safety and reliability of plants, that is, an automatic ultrasonic flaw detector for the welded parts of bend pipes, an automatic disassembling and inspection system for control rod driving mechanism, a fuel automatic inspection system, and automatic decontaminating equipments for steam generator water chambers, primary system crud and radioactive gas in coolant. The results of the verification test of these equipments were judged as satisfactory, therefore, the application to actual plants is possible. (Kako, I.)

  7. A locomotive inspection robot for turbine building interior inspection in nuclear power plants

    International Nuclear Information System (INIS)

    Obama, M.; Ozaki, F.; Asano, K.

    1985-01-01

    A locomotive inspection robot, named Turbine Building Inspection System (TBIS), has been developed for turbine building interior inspections in nuclear power plants. This robot is made up of a vehicle, a telescopic support, turning head and a multijoint arm which has dual TV cameras and a diagnostic rod on its tip. The multijoint arm has 17 degrees of freedom and its length is 243 cm. Minimum and maximum heights for the multijoint arm shoulder are 1.5 meter and 4 meters respectively. The total degree of freedom in the combination of the multijoint arm, turning head and telescopic support is 19 and the area, it is capable of inspecting, is equal to the cylindrical dome whose height and diameter are 6.4 meters and 4.8 meters respectively. The design philosophy, hardware structure and operation method of the TBIS are described. 2 refs.; 10 figs

  8. 7 CFR 160.66 - Fees for inspection services.

    Science.gov (United States)

    2010-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE (CONTINUED) NAVAL STORES REGULATIONS AND... with the cost of the service rendered. Such fees and charges may be announced to the trade in such...

  9. 9 CFR 2.128 - Inspection for missing animals.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Inspection for missing animals. 2.128 Section 2.128 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE ANIMAL WELFARE REGULATIONS Miscellaneous § 2.128 Inspection for missing animals. Each dealer...

  10. 78 FR 66892 - BASF Plant Science LP; Availability of Plant Pest Risk Assessment and Environmental Assessment...

    Science.gov (United States)

    2013-11-07

    .... Kevin Shea, Administrator, Animal and Plant Health Inspection Service. [FR Doc. 2013-26701 Filed 11-6-13... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service [Docket No. APHIS-2012-0028] BASF Plant Science LP; Availability of Plant Pest Risk Assessment and Environmental Assessment for...

  11. Regulatory inspection activities on nuclear power plant sites during construction in the United Kingdom

    International Nuclear Information System (INIS)

    Jeffery, J.V.

    1977-01-01

    The work of regulatory inspection of the construction of the plant on the site is performed not only by the inspector who has been allocated to inspection duties for that site but also by the specialist staff who are involved with the safety assessment of the plant. The co-ordination of this work is described in the paper and examples are given of inspection activities associated with the enforcement requirements of licence conditions as well as those related to the inspection of the plant itself. (author)

  12. 7 CFR 302.2 - Movement of plants and plant products.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 5 2010-01-01 2010-01-01 false Movement of plants and plant products. 302.2 Section... INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE DISTRICT OF COLUMBIA; MOVEMENT OF PLANTS AND PLANT PRODUCTS § 302.2 Movement of plants and plant products. Inspection or documentation of the plant health status of...

  13. RSE-M: In-Service Inspection Rules for Mechanical Components of PWR Nuclear Islands

    International Nuclear Information System (INIS)

    2016-01-01

    The RSE-M code defines in-service inspection operations. It applies to pressure equipment used in PWR plants, as well as spare parts for such equipment. The RSE-M code does not apply to equipment made from materials other than metal. It is based on the RCC-M code for requirements relating to the design and fabrication of mechanical components. Use: The inspection rules specified in the RSE-M code describe the standard requirements of best practice within the French nuclear industry, based on its own feedback from operating several nuclear units and partly supplemented with requirements stipulated by French regulations. To date, the 58 units in France's nuclear infrastructure enforce the in-service inspection rules of the RSE-M code. Operation of 30 commissioned units in China's nuclear infrastructure, corresponding to the M310, CPR-1000 and CPR-600 reactors, is based on the RSE-M code (since 2007, use of AFCEN codes has been required by NNSA for Generation II+ reactors). Contents of the 2016 Edition: Volume I - Rules: Section A - General rules, Section B - Specific rules for class 1 components, Section C - Specific rules for class 2 or 3 components, Section D - Specific rules for components not assigned to any particular RSE-M class; Volume II - Appendices 1 to 8: Appendices 1.0 to 1.9: supporting appendices for the general requirements, Appendix 2.1: appendix associated with chap. 2000 Requalifications, Hydraulic Proof Tests and Hydraulic Tests, Appendices 4.1 to 4.4: appendices associated with chap. 4000 Examination techniques, Appendices 5.1 to 5.8 and RPP2: appendices associated with chap. 5000 Mechanical and Materials, Appendices 8.1 to 8.2: appendices associated with chap. 8000 Maintenance Operations; Volume III: Appendix 3.1 - Visit tables: main primary and secondary systems, EPR pre-service inspection program, Class 2 or 3 vessels; Appendix 3.2 - Inspection Plans For Non-Nuclear Pressure Equipment

  14. Methodology for qualification of in-service inspection systems for WWER nuclear power plants. A publication of the extrabudgetary programme on the safety of WWER and RBMK nuclear power plants

    International Nuclear Information System (INIS)

    1998-03-01

    Program was initiated by IAEA in 1990 with the aim to assist the countries of Central and Eastern Europe and former Soviet Union in evaluating the safety of their first generation WWER-440/230 nuclear power plants. The main objectives were: to identify major design and operational safety issues; to establish international consensus on priorities for safety improvements; and to provide assistance in the review of the competence and and adequacy of safety improvement programs. The scope was extended in 1992 to include RBMK, WWER-440/312 and WWER-1000 plants in operation and under construction. Integrity of primary circuit is fundamental for the safe operation of any nuclear power plant. In-service inspection (ISI) in general terms and in particular, non-destructive tests (NDT) play a key role in maintaining primary circuit integrity. This report provides a methodology for qualification of ISI systems which might be used by WWER operating countries as a commonly accepted basis for further development of the necessary qualification related infrastructures. It also provides several qualification principles defining the administrative framework needed for the practical implementation of the methodology, a description of the process of qualification of an inspection system, specifying its minimum technical and documentation related requirements, as well as specific requirements with regard to the NDT procedures, equipment and personnel to be qualified and the test specimen to be used in practical trials. Finally, the report suggests an appropriate distribution of responsibilities among all the parties involved in a qualification process, based on international practice

  15. West Valley Reprocessing Plant. IE inspection report No. 75-8

    International Nuclear Information System (INIS)

    1975-01-01

    Results of an inspection of the West Valley Processing Plant on October 20-23, 1975 are reported. The inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector. No items of noncompliance were observed

  16. 77 FR 11437 - Inspection Service Authority; Seizure and Forfeiture

    Science.gov (United States)

    2012-02-27

    ... POSTAL SERVICE 39 CFR Part 233 Inspection Service Authority; Seizure and Forfeiture AGENCY: Postal... Service's rules and regulations regarding the seizure and forfeiture of property into three sections, 39.... The proposed revision consolidates sections 233.8 and 233.9, and treats seizures involving personal...

  17. Qualification of NDT techniques for in-service inspections in nuclear power plants in accordance with ENIQ - examples and lessons - learned

    International Nuclear Information System (INIS)

    Just, T.; Csapo, G.

    2006-01-01

    ENIQ (European Network for Inspection and Qualification) has developed regulations on how to qualify non-destructive testing (NDT) methods and techniques in a standardized and structured manner. Two major innovative qualifications were carried out and reviewed with regard to implementation, according to the recommended German practice of ENIQ. The conclusions were drawn after performing the ENIQ qualification procedure for in-service inspections (ISI) of real components in nuclear power plants (NPP). The first example covers the qualification of NDT methods for the detection and characterization of surface, subsurface and underclad cracks in the area of the austenitic cladded RPV surface. Open and blind tests were conducted applying UT and ET (from the ID) and UT (from the OD) on realistic flaws (artificially induced IGSCC, hot cracks and fatigue cracks) in the cladding of a full scale RPV mock-up from MPA Stuttgart. The second example covers the qualification of mechanised RT in combination with tomography (developed by the BAM) for the sizing of cracks in pipe welds. For both qualification procedures TUEV NORD SysTec experts were part of the qualification body. The proposed NDT procedures have been qualified within defined limits of application. Recommendations were made to optimise the procedures and the techniques itself further. (orig.)

  18. Preliminary conceptual design of inspection and maintenance for KALIMER reactor system

    Energy Technology Data Exchange (ETDEWEB)

    Joo, Young Sang; Kim, Seok Hun; Yoo, Bong

    2000-08-01

    In-service inspection and maintenance are very important for improving the safety and availability of nuclear power plants. The conceptual requirements of in-service inspection and maintenance should be reflected in the earlier design process for the verification of the plant operability and reliability. In this report the fundamental approaches of the inspection and maintenance for KALIMER are established to ensure the structural integrity and operability for KALIMER. The general strategy and methodology of maintenance and inspection for the reactor system and components are proposed and described for satisfying the intents of the section XI, division 3, of ASME code and considering the design characteristics of KALIMER.

  19. 5 CFR 8301.104 - Additional rules for employees of the Food Safety and Inspection Service.

    Science.gov (United States)

    2010-01-01

    ... Food Safety and Inspection Service. 8301.104 Section 8301.104 Administrative Personnel DEPARTMENT OF....104 Additional rules for employees of the Food Safety and Inspection Service. Any employee of the Food Safety and Inspection Service not otherwise required to obtain approval for outside employment under...

  20. Improvement and optimization for in-service inspection of M310 nuclear power station

    International Nuclear Information System (INIS)

    Wang Chen; Sun Haitao; Gao Chen; Deng Dong

    2015-01-01

    In-service inspection (ISI) is an important method to ensure the safety of the mechanical equipment in nuclear power stations. According to the in-service inspection experience feedback from the domestic nuclear power stations, the reasonableness of some provisions in the RSE-M code are discussed and the applications of risk-informed in-service inspection (RI-ISI) are introduced, and the advices for the optimization of the ISI of the domestic M310 nuclear power stations are proposed. (authors)

  1. Preventing degradation and in-service inspection of NPP steam generator

    International Nuclear Information System (INIS)

    Ding Xunshen

    1999-01-01

    The author describes the degradation of steam generator tubes in initial operating stage of France NPP. The author emphatically presents the preventive measures to tackle degradation and In-service inspection of Daya Bay NPP 1 unit as a guarantee of safety operation, including secondary side water chemistry monitoring and controlling, leakage rate monitoring, eddy-current inspection, mechanical cleaning, cleanliness inspection, foreign objects removal and etc

  2. In-service inspection in the Superphenix 1 vessels interspace

    International Nuclear Information System (INIS)

    Asty, M.; Saglio, R.

    1983-03-01

    The design of Superphenix 1 reactor vessels allows their in-service inspection. A self-propelling engine, the MIR, has been concieved for this need: it can do a visual and ultrasonic inspection. The MIR can move in the whole vessels interspace. The operating conditions are specified and the principle characteristics of the MIR engine are presented [fr

  3. Study on in-service inspection methods for the above-ground oil tanks floors

    Energy Technology Data Exchange (ETDEWEB)

    Min Xiong; Yewei Kang; Mingchun, Lin; Yi Sun [PetroChina Pipeline R and D Center, Langfang (China)

    2009-07-01

    It is very dangerous to the environment when oil tank floors get corrosion or leak during its long-time service. The traditional inspection methods need to shut down a tank and to empty it, then to clean it in order to inspect the floor. Comparing with the traditional methods, the in-service methods can inspect tank floors rapidly without removing product and opening the tank and can save many costs of tank emptying and cleaning. This paper explores three up-to date in-service inspection methods for the oil tank floors which are acoustic emission technology ultrasonic guided wave technology and mobile robot technology. The theoretic foundation and application status of each method is described. The advantage and disadvantage of each in-service detection technology is concluded. At last some proposals are made. (author)

  4. Monitoring well inspection and maintenance plan Y-12 Plant, Oak Ridge, Tennessee (revised)

    International Nuclear Information System (INIS)

    1996-09-01

    Inspection and maintenance of groundwater monitoring wells is a primary element of the Oak Ridge Y-12 Plant Groundwater Protection Program (GWPP). This document is the revised groundwater monitoring well inspection and maintenance plan for the U.S. Department of Energy (DOE) Y-12 Plant in Oak Ridge, Tennessee. The plan provides a systematic program for: (1) inspecting the physical condition of monitoring wells at the Y-12 Plant and (2) identifying maintenance needs that will extend the life of each well and ensure that representative groundwater quality samples and hydrologic data are collected from the wells. Original documentation for the Y-12 Plant GWPP monitoring well inspection and maintenance program was provided in HSW, Inc. 1991a. The original revision of the plan specified that only a Monitoring Well Inspection/Maintenance Summary need be updated and reissued each year. Rapid growth of the monitoring well network and changing regulatory requirements have resulted in constant changes to the status of wells (active or inactive) listed on the Monitoring Well Inspection/Maintenance Summary. As a result, a new mechanism to track the status of monitoring wells has been developed and the plan revised to formalize the new business practices. These changes are detailed in Sections 2.4 and 2.5

  5. 48 CFR 52.246-5 - Inspection of Services-Cost-Reimbursement.

    Science.gov (United States)

    2010-10-01

    ...-Cost-Reimbursement. 52.246-5 Section 52.246-5 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.246-5 Inspection of Services—Cost-Reimbursement. As prescribed in 46.305, insert... furnishing of services, when a cost-reimbursement contract is contemplated: Inspection of Services—Cost...

  6. Integrated inspection programs at Bruce Heavy Water Plant

    Energy Technology Data Exchange (ETDEWEB)

    Brown, K C [Ontario Hydro, Tiverton, ON (Canada)

    1993-12-31

    Quality pressure boundary maintenance and an excellent loss prevention record at Bruce Heavy Water Plant are the results of the Material and Inspection Unit`s five inspection programs. Experienced inspectors are responsible for the integrity of the pressure boundary in their own operating area. Inspectors are part of the Technical Section, and along with unit engineering staff, they provide technical input before, during, and after the job. How these programs are completed, and the results achieved, are discussed. 5 figs., 1 appendix.

  7. Integrated inspection programs at Bruce Heavy Water Plant

    International Nuclear Information System (INIS)

    Brown, K.C.

    1992-01-01

    Quality pressure boundary maintenance and an excellent loss prevention record at Bruce Heavy Water Plant are the results of the Material and Inspection Unit's five inspection programs. Experienced inspectors are responsible for the integrity of the pressure boundary in their own operating area. Inspectors are part of the Technical Section, and along with unit engineering staff, they provide technical input before, during, and after the job. How these programs are completed, and the results achieved, are discussed. 5 figs., 1 appendix

  8. In-service materials testing of selected components of unit 1 and 2 of V-1 nuclear power plant

    International Nuclear Information System (INIS)

    Cintula, J.

    1982-01-01

    The task of in-service nondestructive testing of nuclear installations is to confirm that the state of base material and welded joints has not changed owing to mechanical, thermal or radiation stress. Under the regulations of safe operation the first in-service inspection of all components of a WWER 440 reactor must be carried out after 15,000 to 2O,00O operating hours at the latest. Further in-service inspections are repeated after 30,000 hours (pressure vessels) and 40,000 hours (the main steam piping and the feedwater piping). Proceeding from experience gained so far, intervals are suggested for in-service checks of the other components of the V-1 nuclear power plant. Also briefly described are the main nondestructive methods used for such checks at this power plant. (Z.M.)

  9. Proceedings of the specialists' meeting on regulatory inspection practices in nuclear power plants

    International Nuclear Information System (INIS)

    1977-01-01

    The sessions and contributions of this conference are dealing with: the general problems of regulatory inspection of nuclear power plants and overall national practices (in Canada, France, Germany, Italy, Spain, the United States), specific problems and practical experience of regulatory inspection during site study, evaluation, design, manufacturing and construction of nuclear plants (in Finland, Germany, Spain, Sweden, Great-Britain, United States), quality insurance issues, pressure component regulations, specific problems and practical experience of regulatory inspection during commissioning (in Spain, Sweden, Great-Britain and United States), specific problems and practical experience of regulatory inspection during operation (in Spain, Great-Britain, Unites States, Italy and Sweden), special aspects of regulatory inspection (notably public information issues in Sweden and in Great-Britain, inspection of nuclear fuel transportation in Spain, enforcement programme in the USA)

  10. The contribution of inspection to the management of risk

    Energy Technology Data Exchange (ETDEWEB)

    Baron, J. [Folville Consulting Inc., Ontario (Canada)

    2016-01-15

    Over the recent several years, the nuclear power industry has moved to designing in-service inspection programs based on plant risk analyses. This has led to significant reduction in the amount of inspections required thereby reducing the cost of the inspection process itself but, more significantly, the cost due to plant downtime. Inspection has no impact on the consequence of failure but, rather, mitigates risk through reduction in the probability of failure. In so doing, it is important to consider the reliability of inspections, how reliability may be improved through deployment of automation but consideration must also be given to human factors with respect to achieving and reporting correct results. (author)

  11. Improved in-service inspection program for management of degradation in steam generator tubing

    International Nuclear Information System (INIS)

    Kurtz, R.; Heasler, P.; Muscara, J.

    1992-01-01

    This paper presents an overview of significant results from NRC-sponsored research on steam generator tube integrity and inspection. Burst test results are described along with empirical models to relate flaw geometry and size to tube burst pressure. Results of round robin examinations of a retired-from-service steam generator to determine eddy current inspection reliability are presented. An evaluation and comparison of various sampling plans for in-service inspection of steam generators is discussed. Finally, performance demonstration qualification efforts for eddy current inspection systems are described

  12. The use of NPAR [Nuclear Plant Aging Research] results in plant inspection activities

    International Nuclear Information System (INIS)

    Gunther, W.; Taylor, J.

    1989-01-01

    The Nuclear Plant Aging Research (NPAR) Program is a hardware oriented research program which has produced a large data base of equipment and system operating, maintenance, and testing information. A review of the NRC Inspection Program and discussions with NRC inspection personnel have revealed several areas where NPAR research results would be valuable to the inspector. This paper describes the NPAR information which can enhance inspection activities, and provides alternatives for making these pertinent research results available to the inspectors. The NRC Inspection Program emphasis is on evaluating the performance of licensees by focusing on requirements and standards associated with administrative, managerial, engineering, and operational aspects of licensee activities. The Program recognizes that licensees may satisfy NRC requirements differently, and therefore expresses inspection guidance in the form of performance objectives and evaluation criteria. for the resident and regional inspectors, procedures have been written covering various subject areas, such as operations, maintenance, and surveillance. Some of these procedures contain guidance related to aging degradation. The types of information generated by NPAR which were found to be relevant to inspection needs include the following: functional indicators; failure modes, causes, effects; stresses which cause degradation; maintenance recommendations; inspection prioritization. 3 refs

  13. 48 CFR 846.470 - Use of commercial organizations for inspections and grading services.

    Science.gov (United States)

    2010-10-01

    ... organizations for inspections and grading services. 846.470 Section 846.470 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS CONTRACT MANAGEMENT QUALITY ASSURANCE Government Contract Quality Assurance 846.470 Use of commercial organizations for inspections and grading services. The contracting...

  14. Non-destructive inservice inspections

    International Nuclear Information System (INIS)

    Kauppinen, P.; Sarkimo, M.; Lahdenperae, K.

    1998-01-01

    In order to assess the possible damages occurring in the components and structures of operating nuclear power plants during service the main components and structures are periodically inspected by non-destructive testing techniques. The reliability of non-destructive testing techniques applied in these inservice inspections is of major importance because the decisions concerning the needs for repair of components are mainly based on the results of inspections. One of the targets of this research program has been to improve the reliability of non-destructive testing. This has been addressed in the sub-projects which are briefly summarised here. (author)

  15. Supervision and inspection plans of plants activities

    International Nuclear Information System (INIS)

    Feijoo, J. P.

    2009-01-01

    Any idea of hierarchization between supervisor and supervised in inspection and supervision activities should necessarily be dismissed, and the independence of the supervisor when executing has tasks should be guaranteed. The inspection and supervision program enable the detection and resolution of materials and human problems alike. In addition, they are a solution to anticipate potential problems in the future, which results in a very significant reduction of industrial accidents and human errors, as well as better use and upkeep of equipment. With these programs we improve our management and our work, and without a doubt they help to strengthen the safety culture in Cofrentes Nuclear Power Plant. (Author)

  16. Cost regulation on the inspection of plants requiring supervision

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    According to annexes I to VI of this regulation, TUeVs (technical control authorities) (2nd sentence of para. 1 of sect. 24 c of the trade law) collect fees for inspections ordered by the authorities for the following plants and installations: 1. steam boiler plants, 2. pressure vessels, high-pressure gas vessels, feeders, 3. lifts, 4. acetylene plants, 5. plants for the storage, racking and transport of combustile liquids, 6. electrical installations on hazardous location. (orig.) [de

  17. Process and device for remote inspection of parts of a nuclear plant

    International Nuclear Information System (INIS)

    Schmalfuss, H.

    1987-01-01

    The process is suitable for remote position inspection of the parts of the plant in a large hot cell, for example of a reprocessing plant. A device with a TV camera was selected as the inspection system, where pictures obtained by photography are compared (photogrammetry). The possible resolution is considerably increased by using two spatially movable separate picture systems with the associated drawing media. (DG) [de

  18. Auxiliary feedwater system risk-based inspection guide for the Ginna Nuclear Power Plant

    International Nuclear Information System (INIS)

    Pugh, R.; Gore, B.F.; Vo, T.V.; Moffitt, N.E.

    1991-09-01

    In a study sponsored by the US Nuclear Regulatory Commission (NRC), Pacific Northwest Laboratory has developed and applied a methodology for deriving plant-specific risk-based inspection guidance for the auxiliary feedwater (AFW) system at pressurized water reactors that have not undergone probabilistic risk assessment (PRA). This methodology uses existing PRA results and plant operating experience information. Existing PRA-based inspection guidance information recently developed for the NRC for various plants was used to identify generic component failure modes. This information was then combined with plant-specific and industry-wide component information and failure data to identify failure modes and failure mechanisms for the AFW system at the selected plants. Ginna was selected as the eighth plant for study. The product of this effort is a prioritized listing of AFW failures which have occurred at the plant and at other PWRs. This listing is intended for use by NRC inspectors in the preparation of inspection plans addressing AFW risk-important components at the Ginna plant. 23 refs., 1 fig., 1 tab

  19. In-service inspection of electronics components, circuits and nuclear radiation detectors

    International Nuclear Information System (INIS)

    Darbhe, M.D.

    2002-01-01

    A nuclear reactor is a complex process plant. Like a nuclear power plant, the research reactors also employ various nuclear and process systems, the scope and number of such systems being plant-specific. In-service inspection of these systems is an important requirement and is applied at various levels of their constituent units such as detectors, electronics components, circuits and integrated systems. The sensors used cover a wide range such as neutronic, radiation, process (pressure, temperature, flow, level) and many others. The present discussion is limited to neutronic and radiation detectors. The electronic components used normally consist of passive components like resistors, capacitors, semiconductor components like diodes, transistors, analog integrated circuits and digital integrated circuits and electromagnetic relays, to name a few. In order to have a comprehensive surveillance and ISI plan, over the entire plant life, it is necessary to understand various mechanisms, which degrade the performance of these systems. These are discussed initially and later various ISI methods that are used on component-circuit or system level, to ensure optimum system performance, are discussed. The computerised systems, because of hardware and software considerations, have to be given special attention, and the same are discussed briefly

  20. Archiving plant inspection data in a virtual environment

    International Nuclear Information System (INIS)

    Kita, Nobuyuki; Kita, Yasuyo; Yang, Hai-quan

    2004-01-01

    ''Digital Maintenance Field Technology'' was proposed for reliable and robust maintenance of a nuclear power plant. It digitizes and maintains whole information of maintenance fields in computer system for a long time. Digital Field Archival Technology'' is one of three core technologies of the ''Digital Maintenance Field Technology''. The essential functions of the Digital Field Archival Technology'' is to store, maintain and visualize the inspection data during a long period. In order to enable the operators or other agents to review the plant information at any time, at any location and in any form, the information must be stored with collect indexes of time and space. The virtual space resembling the real space is suitable to store the observed information. In this paper, the concept to store the observed information into the virtual space is realized under the assumption that the geometrical structure of real plant is static and reconstructed in the virtual space. The system for storing observed information especially image data gotten by mobile inspection robots and visualizing the stored data as desired is introduced. (author)

  1. Regulatory inspection practices for nuclear power plants in the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Kellermann, Otto.

    1977-01-01

    Applicants for a licence as well as the competent bodies in this field are responsible for justifying the public's confidence in the quality and reliability of the uses of nuclear energy. This concern is reflected in the legal provisions and the philosophy applicable to statutory inspections in the Federal Republic of Germany. This paper describes the organisation, the purposes and the number of inspections performed at the design, the construction and the operational stages of nuclear power plants as well as the inspections organised following unexpected events and includes the comparison of various inspection costs with the overall costs of a nuclear power plant. (NEA) [fr

  2. Auxiliary feedwater system risk-based inspection guide for the North Anna nuclear power plants

    International Nuclear Information System (INIS)

    Nickolaus, J.R.; Moffitt, N.E.; Gore, B.F.; Vo, T.V.

    1992-10-01

    In a study sponsored by the US Nuclear regulatory Commission (NRC), Pacific Northwest Laboratory has developed and applied a methodology for deriving plant-specific risk-based inspection guidance for the auxiliary feedwater (AFW) system at pressurized water reactors that have not undergone probabilistic risk assessment (PRA). This methodology uses existing PRA results and plant operating experience information. Existing PRA-based inspection guidance information recently developed for the NRC for various plants was used to identify generic component failure modes. This information was then combined with plant-specific and industry-wide component information and failure data to identify failure modes and failure mechanisms for the AFW system at the selected plants. North Anna was selected as a plant for study. The product of this effort is a prioritized listing of AFW failures which have occurred at the plant and at other PWRs. This listing is intended for use by the NRC inspectors in preparation of inspection plans addressing AFW risk important components at the North Anna plant

  3. Inspection of licensed nuclear power plants in the United States

    International Nuclear Information System (INIS)

    Thornburg, H. D.

    1977-01-01

    Inspection of licensed nuclear power plants in the United States is performed by the Office of Inspection and Enforcement (IE), United States Nuclear Regulatory Commission. IE has several key functions : a) Inspection of licensees and investigation of incidents, occurrences and allegations. b) Detection and correction of safety and security problems. c) Enforcement of rules, regulations, and Commission orders. d) Feedback to the industry and others regarding safety experience. e) Informing the public and others. Major enforcement actions and events involving operating power reactors for the past several years will be summarized. (author)

  4. Development of Inspection Technique for Socket Weld of Small Bore Piping in Nuclear Power Plant

    International Nuclear Information System (INIS)

    Yoon, Byungsik; Kim, Yongsik; Lee, Jeongseok

    2013-01-01

    The losses incurred by unplanned shutdowns are significant; consequently, early crack initiation and crack detection, including the detection of fillet weld manufacturing defects, is of the utmost importance. Current inspection techniques are not capable of reliably inspecting socket welds; therefore, new approaches are needed. The new technique must be sensitive to socket weld cracking, which usually initiates from the root, in order to detect the cracking during the early failure phase. In 2008, Kori unit 3 experienced leakage from the drain line socket weld of a steam generator. From this experience, KHNP enforced a management program to focus on enhancing the reliability of small bore socket weld piping inspections. Currently, conventional manual ultrasonic inspection techniques are used to detect service induced fatigue cracks. But there was uncertainty on manual ultrasonic inspection because of limited access to the welds and difficulties with contact between the ultrasonic probe and the OD surface of small bore piping. In this study, phased array ultrasonic inspection techniques are applied to increase inspection speed and reliability. Additionally a manually encoded scanner has been developed to enhance contact conditions and maintain constant signal quality. A phased array UT technique and system was developed to inspect small bore socket welds. The experimental results show all artificial flaws in the specimen were detected and measured. These experimental results show, that the newly developed inspection system, has improved the reliability and speed of small bore socket weld inspection. Based on these results, future works shall focus on additional experiments, with more realistic flaw responses. By applying this technique to the field, we expect that it can improve the integrity of small bore piping in nuclear power plants

  5. Robotic fabrication and inspection for power plants

    International Nuclear Information System (INIS)

    Date, Ranjit

    2002-01-01

    The usage of Robotic Automation is now an integral part of the modern manufacturing systems. Applications in nuclear power plants is no exception. As a matter of fact, as a result of the hazards of radiations for the human workers makes automation of the on-site working highly desirable. This presentation will focus on the broad benefits by use of automation in Power plants. Various processes and technologies for robotic applications in fabrication, maintenance and inspection will be highlighted. The specific technology features for use in nuclear environments will be highlighted

  6. Life extension, power upgrade, and return to service work for Pickering NGS and other PWR and CANDU plants

    International Nuclear Information System (INIS)

    Millman, J.; Idvorian, N.; Schneider, W.

    2002-01-01

    Work on life extension, power upgrade and return to service has been performed and is in progress for a number of PWR and CANDU plants. For PWR plants, power upgrade work has been done for the new replacement steam generators in several cases. This work consists of redoing the formal equipment qualification analysis and reports for the uprated operating conditions to support the application for license adjustment. Life extension assessments have been performed for several CANDU plants. These are highly detailed assessments in which the particular steam generator is reassessed part by part as to the ability of each to sustain full life operation and also extended life operation. Return to service work for Pickering NGSA specifically has included this type of assessment and also specific repair, cleaning and retrofit activities including secondary side inspection, waterlancing, divider plate repair, eddy current inspection, etc. Steam generator modifications and retrofit work have been performed in a number of cases. The paper discusses various life extension, power upgrade, equipment modification and return to service activities all of which are part of the renewed drive in the industry to realise the full potential of nuclear plants by getting more and better performance from the extended service of existing plants. (author)

  7. Simulating the service life performance of an inspected group of jacket-type structures

    DEFF Research Database (Denmark)

    Schneider, Ronald; Thöns, Sebastian; Rogge, Andreas

    2017-01-01

    and risk. We intend to adopt this approach to optimize inspection, monitoring and repair activities for offshore wind park support structures. As a first step, we simulate – in analogy to an offshore wind park – the service life performance of an inspected group of jacket-type frames. The performance......A novel method for risk-based optimization of inspection and repair strategies for deteriorating structural systems has recently been proposed. The method defines heuristics at the system level to reduce the number of possible strategies. For each defined strategy, it computes the updated system...... failure probability conditional on simulated inspection and repair histories, and evaluates the associated costs and risk. The expected total service life costs and risk for a strategy are finally determined using Monte Carlo simulation. The optimal strategy minimizes the expected total service life costs...

  8. Inspection and enforcement by the regulatory body for nuclear power plants

    International Nuclear Information System (INIS)

    1980-01-01

    This Safety Guide was prepared as part of the Agency's programme, referred to as the NUSS programme, for establishing Codes of Practice and Safety Guides relating to nuclear power plants. It supplements the Code of Practice on Governmental Organization for the Regulation of Nuclear Power Plants, IAEA Safety Series No.50-C-G and should be used in conjunction with that document. The purpose of this Guide is to provide information, guidance and recommendations to assist Member States in (1) establishing and conducting a regulatory inspection programme for nuclear power plants, (2) establishing requirements for the applicant/licensee in regard to regulatory inspection, (3) establishing a system for enforcing compliance with the requirements and decisions of the regulatory body

  9. Inspection activities of other strategic points (OSPs) at Rokkasho Reprocessing Plant

    International Nuclear Information System (INIS)

    Kaifuki, Yukinobu; Ebata, Takashi; Nakano, Sadayuki; Fujimaki, Kazunori

    2008-01-01

    At Rokkasho Reprocessing Plant (RRP), Active Test (AT) using actual spent fuels for the final confirmation of the equipment and the system has been performed since March 31, 2006 toward the commercial operation. The safeguards inspection during AT is required in the same manner as commercial operation condition because plutonium is handled. In RRP automated verification systems are established by using unattended verification systems including a number of process monitoring systems along with main plutonium handling process from the spent fuel storage until the MOX product storages. Even under the modernized safeguards, inspection activities at Other Strategic Points (OSPs) are required to confirm plant status in accordance with requirements of the IAEA safeguards criteria. This paper presents procedures and inspection activities at OSPs which has been implemented in RRP since start of AT. (author)

  10. Periodic inspection of CANDU nuclear power plant containment components

    International Nuclear Information System (INIS)

    1989-09-01

    This Standard is one in a series intended to provide uniform requirements for CANDU nuclear power plants. It provides requirements for the periodic inspection of containment components including the containment pressure suppression systems

  11. Department of Agriculture, Food Safety and Inspection Service

    Science.gov (United States)

    ... Standard Forms FSIS United States Department of Agriculture Food Safety and Inspection Service About FSIS District Offices Careers Contact Us Ask ... Reports Fact Sheets Food Defense and Emergency Response Food Safety Education FSIS ... Assistance Contact Centers Cooperative Agreements Email Subscription ...

  12. Regulatory inspection in Spain

    International Nuclear Information System (INIS)

    Alvarez de Buergo, L.

    1977-01-01

    The 1964 Act on Nuclear Energy lays down that the Junta de Energia Nuclear is responsible for assessing the hazards of and inspecting nuclear power plants as well as for the transport of nuclear fuel for these plants. The Junta de Energia Nuclear has a specialised service, the Nuclear Safety Department in charge of performing these duties. Experience acquired from work in this field is analysed in this paper. (NEA) [fr

  13. 75 FR 2480 - Wildlife Services; Availability of an Environmental Assessment and Finding of No Significant Impact

    Science.gov (United States)

    2010-01-15

    .... Kevin Shea Acting Administrator, Animal and Plant Health Inspection Service. [FR Doc. 2010-806 Filed 1... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service [Docket No. APHIS-2009-0087...: Animal and Plant Health Inspection Service, USDA. ACTION: Notice. SUMMARY: We are advising the public...

  14. Incidence of Listeria spp. in Ready-to-Eat Food Processing Plant Environments Regulated by the U.S. Food Safety and Inspection Service and the U.S. Food and Drug Administration.

    Science.gov (United States)

    Reinhard, Robert G; Kalinowski, Robin M; Bodnaruk, Peter W; Eifert, Joseph D; Boyer, Renee R; Duncan, Susan E; Bailey, R Hartford

    2018-06-07

    A multiyear survey of 31 ready-to-eat (RTE) food processing plants in the United States was conducted to determine the incidence of Listeria spp. in various RTE production environments. Samples were collected from 22 RTE plants regulated by the U.S. Department of Agriculture's Food Safety and Inspection Service (FSIS) and from 9 RTE food plants regulated by the U.S. Department of Health and Human Services' Food and Drug Administration (FDA). Only nonfood contact surfaces in the RTE manufacturing areas with exposed RTE product were sampled. Each sample was individually analyzed for the presence of Listeria spp. by using a PCR-based rapid assay. In total, 4,829 samples were collected from various locations, including freezers, equipment framework, floors, walls, wall-floor junctures, drains, floor mats, doors, and cleaning tools. Nine (29%) of the facilities had zero samples positive for Listeria spp. in the production environment, whereas 22 (71%) had one or more samples positive for Listeria spp. The total incidence of Listeria spp. in all RTE food plants was 4.5%. The positive rate in plants regulated by the FSIS ranged from 0 to 9.7%, whereas the positive rate in plants regulated by the FDA ranged from 1.2 to 36%.

  15. 9 CFR 91.15 - Inspection of animals for export.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Inspection of animals for export. 91.15 Section 91.15 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE EXPORTATION AND IMPORTATION OF ANIMALS (INCLUDING POULTRY) AND ANIMAL PRODUCTS...

  16. 78 FR 68020 - Evaluation of Established Plant Pests for Action at Ports of Entry

    Science.gov (United States)

    2013-11-13

    .... Kevin Shea, Administrator, Animal and Plant Health Inspection Service. [FR Doc. 2013-27132 Filed 11-12... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service [Docket No. APHIS-2013-0048] Evaluation of Established Plant Pests for Action at Ports of Entry AGENCY: Animal and Plant Health Inspection...

  17. Auxiliary feedwater system risk-based inspection guide for the Palo Verde Nuclear Power Plant

    International Nuclear Information System (INIS)

    Bumgardner, J.D.; Moffitt, N.E.; Gore, B.F.; Vo, T.V.; Sloan, J.A.

    1993-02-01

    In a study sponsored by the US Nuclear Regulatory Commission (NRC), Pacific Northwest Laboratory has developed and applied a methodology for deriving plant-specific risk-based inspection guidance for the auxiliary feedwater (AFW) system at pressurized water reactors that have not undergone probabilistic risk assessment (PRA). This methodology uses existing PRA results and plant operating experience information. Existing PRA-based inspection guidance information recently developed for the NRC for various plants was used to identify generic component failure modes. This information was then combined with plant-specific and industry-wide component information and failure data to identify failure modes and failure mechanisms for the AFW system at the selected plants. Palo Verde was selected as one of a series of plants for study. The product of this effort is a prioritized listing of AFW failures which have occurred at the plant and at other PWRs. This listing is intended for use by NRC inspectors in the preparation of inspection plans addressing AFW risk-important components at the Palo Verde plants

  18. Auxiliary feedwater system risk-based inspection guide for the McGuire nuclear power plant

    International Nuclear Information System (INIS)

    Bumgardner, J.D.; Lloyd, R.C.; Moffitt, N.E.; Gore, B.F.; Vo, T.V.

    1994-05-01

    In a study sponsored by the US Nuclear Regulatory Commission (NRC), Pacific Northwest Laboratory has developed and applied a methodology for deriving plant-specific risk-based inspection guidance for the auxiliary feedwater (AFW) system at pressurized water reactors that have not undergone probabilistic risk assessment (PRA). This methodology uses existing PRA results and plant operating experience information. Existing PRA-based inspection guidance information recently developed for the NRC for various plants was used to identify generic component failure modes. This information was then combined with plant-specific and industry-wide component information and failure data to identify failure modes and failure mechanisms for the AFW system at the selected plants. McGuire was selected as one of a series of plants for study. The product of this effort is a prioritized listing of AFW failures which have occurred at the plant and at other PWRs. This listing is intended for use by NRC inspectors in the preparation of inspection plans addressing AFW risk-important components at the McGuire plant

  19. Auxiliary feedwater system risk-based inspection guide for the Maine Yankee Nuclear Power Plant

    International Nuclear Information System (INIS)

    Gore, B.F.; Vo, T.V.; Moffitt, N.E.; Bumgardner, J.D.

    1992-10-01

    In a study sponsored by the US Nuclear Regulatory Commission (NRC), Pacific Northwest Laboratory has developed and applied a methodology for deriving plant-specific risk-based inspection guidance for the auxiliary feedwater (AFW) system at pressurized water reactors that have not undergone probabilistic risk assessment (PRA). This methodology uses existing PRA results and plant operating experience information. Existing PRA-based inspection guidance information recently developed for the NRC for various plants was used to identify generic component failure modes. The information was then combined with plant-specific and industry-wide component information and failure data to identify failure modes and failure mechanisms for the AFW system at the selected plants. Maine Yankee was selected as one of a series of plants for study. ne product of this effort is a prioritized listing of AFW failures which have occurred at the plant and at other PWRs. This listing is intended for use by NRC inspectors in the preparation of inspection plans addressing AFW risk-important components at the Maine Yankee plant

  20. Auxiliary feedwater system risk-based inspection guide for the Point Beach nuclear power plant

    International Nuclear Information System (INIS)

    Lloyd, R.C.; Moffitt, N.E.; Gore, B.F.; Vo, T.V.; Vehec, T.A.

    1993-02-01

    In a study sponsored by the US Nuclear Regulatory Commission (NRC), Pacific Northwest Laboratory has developed and applied a methodology for deriving plant-specific risk-based inspection guidance for the auxiliary feedwater (AFW) system at pressurized water reactors that have not undergone probabilistic risk assessment (PRA). This methodology uses existing PRA results and plant operating experience information. Existing PRA-based inspection guidance information recently developed for the NRC for various plants was used to identify generic component failure modes. This information was then combined with plant-specific and industry-wide component information and failure data to identify failure modes and failure mechanisms for the AFW system at the selected plants. Point Beach was selected as one of a series of plants for study. The product of this effort is a prioritized listing of AFW failures which have occurred at the plant and at other PWRS. This listing is intended for use by NRC inspectors in the preparation of inspection plans addressing AFW risk-important components at the Point Beach plant

  1. Laurels for Swiss in-service inspection team

    International Nuclear Information System (INIS)

    Anon.

    1984-01-01

    Following what is believed to be the first successful application of P-scan ultrasonic testing for the in-service inspection of austenitic welds in the boiling water reactor at Wuergassen (Federal Republic of Germany) last year, Sulzer participated in a 'round robin' test organized by the Electric Power Research Institute in the USA form May to July 1983. (Auth.)

  2. Remote repair and inspection technics in Tokai reprocessing plant

    International Nuclear Information System (INIS)

    Koyama, Kenji; Ishibashi, Yuzo; Otani, Yosikuni

    1986-01-01

    Tokai reprocessing plant of Power Reactor and Nuclear Fuel Development Corp. is the only factory in Japan which treats 0.7 t/day of the spent fuel from LWR power stations and recovers remaining uranium and newly produced plutonium. Since the reprocessing plant started the hot test in September, 1977, about eight years have elapsed, and 233 t of spent fuel was treated as of August, 1985. During this period, the development of various remote working techniques have been carried out to cope with the failure of equipment and to strengthen the preventive maintenance of equipment. In this report, the development of the techniques for the remote repair of leaking dissolving tanks and the development of the remote inspection system for confirming the soundness of equipment in cells are described. In nuclear facilities, from the viewpoint of the reduction of radiation exposure accompanying the works under high radiation, labor saving, the increase of capacity factor by shortening the period of repair works, the improvement of safety and reliability of the facilities by perfecting checkup and inspection and so on, it is strongly desired to put robots in practical use for maintenance and inspection. (Kako, I.)

  3. Optimization on replacement and inspection period of plant equipment

    International Nuclear Information System (INIS)

    Takase, Kentaro; Kasai, Masao

    2004-01-01

    Rationalization of the plant maintenance is one of the main topics being investigated in Japanese nuclear power industries. Optimization of the inspection and replacement period of equipments is effective for the maintenance cost reduction. The more realistic model of the replacement policy is proposed in this study. It is based on the classical replacement policy model and its cost is estimated. Then, to consider the inspection for the maintenance, the formulation that includes the risk concept is discussed. Based on it, two variations of the combination of the inspection and the replacement are discussed and the costs are estimated. In this study the effect of the degradation of the equipment is important. The optimized maintenance policy depends on the existence of significant degradation. (author)

  4. Heat Exchanger Tube Inspection of Nuclear Power Plants using IRIS Technique

    International Nuclear Information System (INIS)

    Yoon, Byung Sik; Yang, Seung Han; Song, Seok Yoon; Kim, Yong Sik; Lee, Hee Jong

    2005-01-01

    Inspection of heat exchange tubing include steam generator of nuclear power plant mostly performed with eddy current method. Recently, various inspection technique is available such as remote field eddy current, flux leakage and ultrasonic methods. Each of these techniques has its merits and limitations. Electromagnetic techniques are very useful to locate areas of concern but sizing is hard because of the difficult interpretation of an electric signature. On the other hand, ultrasonic methods are very accurate in measuring wall loss damage, and are reliable for detecting cracks. Additionally ultrasound methods is not affected by support plates or tube sheets and variation of electrical conductivity or permeability. Ultrasound data is also easier to analyze since the data displayed is generally the remaining wall thickness. It should be emphasized that ultrasound is an important tool for sizing defects in tubing. In addition, it can be used in situations where eddy current or remote field eddy current is not reliable, or as a flaw assessment tool to supplement the electromagnetic data. The need to develop specialized ultrasonic tools for tubing inspection was necessary considering the limitations of electromagnetic techniques to some common inspection problems. These problems the sizing of wall loss in carbon steel tubes near the tube sheet or support plate, sizing internal erosion damage, and crack detection. This paper will present an IRIS(Internal Rotating Inspection System) ultrasonic tube inspection technique for heat exchanger tubing in nuclear power plant and verify inspection reliability for artificial flaw embedded to condenser tube

  5. Evaluation of effectiveness of inservice inspection in aging PWR plants based on PSA

    Energy Technology Data Exchange (ETDEWEB)

    Hanafusa, Hidemitsu; Irie, Takashi; Suyama, Takeshi [Institute of Nuclear Safety Systems Inc., Mihama, Fukui (Japan); Morota, Hidetsugu [Computer Software Development Co., Ltd., Tokyo (Japan)

    2001-09-01

    By making use of a probabilistic fracture mechanics (PFM) code which had been improved to be able to evaluate the influence of thermal aging embrittlement of cast stainless steel, we evaluated the fracture probability of welding parts of the piping of the pressurized water reactor plants in Japan and the core damage frequency by the fracture. In addition, we ranked the welding parts by the safety significance and evaluated the effectiveness of inservice inspection (ISI). As a result, it is seen that the risk increases about 25% for extending the plant life from 40 to 60 years without ISI. However, the influence of the risk on the plant life becomes negligible, when the ISI is performed adequately. This assessment is useful to plan efficient inspection and test programs of a plant under limited resources, because it is available to rank piping segments by the safety significance and to evaluate the effectiveness of inspection and test quantitatively. (author)

  6. Fault Tree Analysis for an Inspection Robot in a Nuclear Power Plant

    Science.gov (United States)

    Ferguson, Thomas A.; Lu, Lixuan

    2017-09-01

    The life extension of current nuclear reactors has led to an increasing demand on inspection and maintenance of critical reactor components that are too expensive to replace. To reduce the exposure dosage to workers, robotics have become an attractive alternative as a preventative safety tool in nuclear power plants. It is crucial to understand the reliability of these robots in order to increase the veracity and confidence of their results. This study presents the Fault Tree (FT) analysis to a coolant outlet piper snake-arm inspection robot in a nuclear power plant. Fault trees were constructed for a qualitative analysis to determine the reliability of the robot. Insight on the applicability of fault tree methods for inspection robotics in the nuclear industry is gained through this investigation.

  7. 7 CFR 51.42 - Charges for inspection services on a contract basis.

    Science.gov (United States)

    2010-01-01

    .... 51.42 Section 51.42 Agriculture Regulations of the Department of Agriculture AGRICULTURAL MARKETING SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE REGULATIONS AND STANDARDS UNDER THE AGRICULTURAL MARKETING ACT OF 1946 FRESH FRUITS, VEGETABLES AND OTHER PRODUCTS 1,2 (INSPECTION...

  8. Examples of in-service inspections and typical maintenance schedule for low-power research reactors

    International Nuclear Information System (INIS)

    Boeck, H.

    1997-01-01

    In-service inspection methods for low-power research reactors are described which have been developed during the past 37 years of the operation of the TRIGA reactor Vienna. Special tools have been developed during this period and their application for maintenance and in-serve inspection is discussed. Two practical in-service inspections at a TRIGA reactor and at a MTR reactor are presented. Further a typical maintenance plan for a TRIGA reactor is listed in the annex. (author)

  9. Inspection of nuclear power plants under construction in Spain

    International Nuclear Information System (INIS)

    Santoma, L.

    1977-01-01

    Brief summary of the situation of the nuclear industry in Spain, in order to better understand the questions involved in the inspection of the Spanish nuclear power plants, as well as the experience acquired, followed by a description of some of the problems which have arisen during the construction phase. Also the problems faced by the Inspection of the Junta de Energia Nuclear are described in order to fulfill the missions entrusted to it. Finally, some recommendations are made in light of the experience had by Spain.(author) [es

  10. Barnwell Nuclear Fuel Plant. IE inspection report No. 75-13

    International Nuclear Information System (INIS)

    1975-01-01

    Copies of the following documents are presented: letter to N. C. Moseley from Allied-General Nuclear Services dated October 16, 1975; letter to Allied-General Nuclear Services from N. C.Moseley dated October 7, 1975; and Region II Inspection Report No. 50-332/75-13

  11. Results from the Nuclear Plant Aging Research Program: Their use in inspection activities

    International Nuclear Information System (INIS)

    Gunther, W.; Taylor, J.

    1990-09-01

    The US NCR's Nuclear Plant Aging Research (NPAR) Program has determined the susceptibility to aging of components and systems, and the potential for aging to impact plant safety and availability. The NPAR Program also identified methods for detecting and mitigating aging in components. This report describes the NPAR results which can enhance NRC inspection activities. Recommendations are provided for communicating pertinent information to NRC inspectors. These recommendations are based on a detailed assessment of the NRC's Inspection Program, and feedback from resident and regional inspectors as described within. Examples of NPAR report summaries and aging inspection guides for components and systems are included. 13 refs., 3 figs., 4 tabs

  12. Super Phenix 1: in Service inspection of main and safety tanks weldments

    International Nuclear Information System (INIS)

    Asty, Michel; Vertut, Jean; Argous, J.P.

    1980-05-01

    In service inspection of the main tank of the Super Phenix 1 reactor is a new demand as compared to Phenix: the authorities have asked that surface and internal defects could be detected and their evolution monitored in the future. The presence of thermal baffles inside the main tank precludes the access on that side: the distance between the main and safety tanks takes into account the room needed for an In Service Inspection module. An inspection vehicle is presently under development, which includes ultrasonic examination (focussed probes) and visual examination (TV cameras) capabilities. We briefly describe the techniques that have been selected for ultrasonic testing and also for the vehicle and its guidance between the tanks

  13. Super Phenix 1: In-service inspection of main and safety tanks weldments

    Energy Technology Data Exchange (ETDEWEB)

    Asty, M [DTech/STA, Centre d' Etudes Nucleaires de Saclay (France); Vertut, J [DPR/STEP, Centre d' Etudes Nucleaires de Saclay (France); Argous, J P [DRNR/STRS, Centre d' Etudes Nucleaires de Cadarache (France)

    1980-11-01

    In Service Inspection of the main tank of the Super Phenix 1 reactor is a new demand compared to Phenix: the authorities have asked that surface and internal defects be detected and their evolution monitored in the future. The presence of thermal baffles inside the main tank precludes the access on that side: the distance between the main and safety tanks takes into account the room needed for an In Service Inspection module. An inspection vehicle is presently under development, which includes ultrasonic examination (focussed probes) and visual examination (TV cameras) capabilities. We briefly describe the techniques that have been selected for ultrasonic testing and also for the vehicle and its guidance between the tanks. (author)

  14. Super Phenix 1: In-service inspection of main and safety tanks weldments

    International Nuclear Information System (INIS)

    Asty, M.; Vertut, J.; Argous, J.P.

    1980-01-01

    In Service Inspection of the main tank of the Super Phenix 1 reactor is a new demand compared to Phenix: the authorities have asked that surface and internal defects be detected and their evolution monitored in the future. The presence of thermal baffles inside the main tank precludes the access on that side: the distance between the main and safety tanks takes into account the room needed for an In Service Inspection module. An inspection vehicle is presently under development, which includes ultrasonic examination (focussed probes) and visual examination (TV cameras) capabilities. We briefly describe the techniques that have been selected for ultrasonic testing and also for the vehicle and its guidance between the tanks. (author)

  15. Risk-based priorities for inspection of nuclear pressure boundary components at selected LWRs

    International Nuclear Information System (INIS)

    Vo, T.V.; Simonen, F.A.; Gore, B.F.; Doctor, S.R.; Smith, B.W.

    1990-01-01

    Data from existing probabilistic risk assessments for eight representative nuclear power plants were used to identify and prioritize the most relevant systems to plant safety. The objective of this paper is to assess current in-service inspection requirements for pressure boundary systems and components, and to develop recommendations for improvements. This study demonstrates the feasibility of using risk-based methods to develop plant-specific inspection plans. Results for the eight representative plants also indicate generic trends that suggest improvements in current inspection plans now based on priorities set in accordance with code definitions of Class 1, 2, and 3 systems

  16. Risk-based priorities for inspection of nuclear pressure boundary components at selected LWRs

    International Nuclear Information System (INIS)

    Vo, T.V.; Simonen, F.A.; Gore, B.F.; Doctor, S.R.; Smith, B.W.

    1990-03-01

    Data from existing probabilistic risk assessments for eight representative nuclear power plants were used to identify and prioritize the most relevant systems to plant safety. The objective was to assess current in-service inspection requirements for pressure boundary systems and components, and to develop recommendations for improvements. This study demonstrates the feasibility of using risk-based methods to develop plant-specific inspection plans. Results for the eight representative plants also indicate generic trends that suggest improvements in current inspection plans now based on priorities set in accordance with code definitions of Class 1, 2, and 3 systems. 2 refs., 4 figs., 5 tabs

  17. Development on multifunctional phased-array fault inspection technology. Aiming at integrity on internals in nuclear power plant reactors

    International Nuclear Information System (INIS)

    Komura, Ichiro; Hirasawa, Taiji; Nagai, Satoshi; Naruse, Katsuhiko

    2002-01-01

    On nuclear power plants sharing an important role in Japanese energy policy, their higher safety and reliability than the other plants are required, and their non-destructive inspection occupies important position for information means to judge their integrity. And, for a part of responses to recent rationalization of the plant operation and increase of aged plants, requirements and positioning onto the non-destructive inspection technology also change. As a result, not only concept on allowable fault sizes is adopted, but also inspection on reactor internals without conventional regulation is obliged to require for size evaluation (sizing) with higher precision to use for secure detection and integrity evaluation of the faults than sizes determined for every internals. For requirement with such higher levels for fault detection and sizing, and for requirement for effective inspection, phased-array supersonic wave fault inspection method is one of the methods with high potential power. Here were introduced on principles and characteristics of the phased-array supersonic wave fault inspection method, and on various fault inspection methods and functions mainly developed for reactor internals inspection. (G.K.)

  18. Case history of a 94 MVA turbo-generator retired after 190.000 hours of service by defects revealed by boresonic in-service inspection

    International Nuclear Information System (INIS)

    Porro, F.; Santoro, M.

    1990-01-01

    The case-history of a turbogenerator manufactured by Ansaldo on 1957 and turned on operation on 1958 then retired after 30 years of operation, with a total of 190.000 hours of service, by defects revealed trough boresonic inspections, will be presented. The rotor was inspected a first time after 130.000 hours of service and was overbored in order to allow further service operations. After other 60.000 hours of service operation the rotor underwent to a new in-service inspection that showed an unacceptable condition. The rotor, retired from service, has been destined to destructive tests in order to verify non-destructive predictions

  19. Regulatory inspections in nuclear plants in the field of radiation protection

    International Nuclear Information System (INIS)

    Hort, M.; Fuchsova, D.

    2014-01-01

    State Office for Nuclear Safety executes state administration and performs inspections at peaceful use of nuclear energy and ionizing radiation in the field of radiation protection and nuclear safety. Inspections on radiation protection at nuclear power plants are secured by inspectors of the Department of Radiation Protection in Fuel Cycle, who work at the Regional centre Brno and Ceske Budejovice. (authors)

  20. Development of in-service inspection system for core support graphite structures in the high temperature engineering test reactor (HTTR)

    Energy Technology Data Exchange (ETDEWEB)

    Sumita, Junya; Hanawa, Satoshi; Kikuchi, Takayuki; Ishihara, Masahiro [Japan Atomic Energy Research Inst., Oarai, Ibaraki (Japan). Oarai Research Establishment

    2003-03-01

    Visual inspection of core support graphite structures using TV camera as in-service inspection and measurement of material characteristics using surveillance test specimens are planned in the High Temperature Engineering Test Reactor (HTTR) to confirm structural integrity of the core support graphite structures. For the visual inspection, in-service inspection system developed from September 1996 to June 1998, and pre-service inspection using the system was carried out. As the result of the pre-service inspection, it was validated that high quality of visual inspection with TV camera can be carried out, and also structural integrity of the core support graphite structures at the initial stage of the HTTR operation was confirmed. (author)

  1. 78 FR 24666 - Updates to the List of Plant Inspection Stations

    Science.gov (United States)

    2013-04-26

    ... 319 Coffee, Cotton, Fruits, Imports, Logs, Nursery stock, Plant diseases and pests, Quarantine..., laboratory facilities for pest and disease identification, and in some cases, provide facilities for...) division who inspect articles to ensure they are free of plant pests and diseases and otherwise comply with...

  2. 78 FR 38411 - Vogtle Electric Generating Plant, Unit 4; Inspections, Tests, Analyses, and Acceptance Criteria

    Science.gov (United States)

    2013-06-26

    ... Plant, Unit 4; Inspections, Tests, Analyses, and Acceptance Criteria AGENCY: Nuclear Regulatory Commission. ACTION: Determination of inspections, tests, analyses, and acceptance criteria completion. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) staff has determined that the inspections, tests...

  3. Report on the Regulators Experience of NDT Qualification for In-service Inspection of Nuclear Components

    International Nuclear Information System (INIS)

    2003-08-01

    In November 1992, the Nuclear Regulators Working Group (NRWG) decided to set up a task force on qualification of non-destructive testing (NDT) systems for pre and in-service inspection of light water reactors. The first task was to agree on the philosophy and principles governing the qualification of techniques, equipment, software, procedures, and personnel for NDT to be used for the inspection of structural components that are important to safety in nuclear power plants; and to establish a common view on essential aspects of NDT qualifications. The first task, which also included a comparison of the common views of the European regulators with the qualification approach outlined in Appendix VIII to Section XI of the ASME Code, was completed in 1996. The result was published in the report ''Common position of European regulators on qualification of NDT systems for pre- and in-service inspection of light water reactor components''2. In parallel, the European nuclear power industries had set up a working group, the European Network for Inspection Qualification (ENIQ), to discuss and agree on how to perform inspection qualifications. In 1995, ENIQ finalized its first version of ''European methodology for qualification of non-destructive tests''3. A second version 4 was then published in 1997. This second version is in relatively close agreement with the principles given in the regulators common position document. With these two basic documents, a platform was established for the further development of qualification strategies in the European countries. The second task of the NRWG Task Force was to follow and evaluate the first ENIQ pilot study from a regulatory point of view. The objective of this pilot study was to explore ways of how to apply the European qualification methodology and to test its feasibility. The pilot study commenced late 1996 and was planned to be finalized a year later. Depending on unforeseen difficulties, the pilot study has been delayed

  4. Accumulation and preparation of nondestructive inspection data for nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-08-15

    In recent years, flaws due to stress corrosion cracking (SCC) in stainless steel piping and nickel based alloy welds were detected at nuclear power plants in Japan. Weld Overlay (WOL) has been developed as a repairing method for piping items without removing flaws. Since the inspection techniques for WOL pipes and nickel based alloy welds are not verified enough in Japan, Japan Nuclear Energy Safety Organization (JNES) has been carrying out a six year research project entitled 'Accumulation and Preparation of Nondestructive Inspection Data for Nuclear Power Plants' regarding nondestructive inspection since FY2007. In this research project, detection and sizing capability of SCC by Ultrasonic Testing (UT) are evaluated using mockup tests. In addition, the results of this project and past nondestructive inspection data performed by JNES projects are gathered, and inputted into the database of NDT information. In FY2012, followings were conducted. 1) Analysis for UT measurement results of nickel based alloy weld simulating safe end of reactor vessel outlet nozzle. 2) Analysis for UT measurement results of cast stainless steel piping. 3) Development of interface of UT simulation. 4) Development of nondestructive testing guideline. (author)

  5. Transfer system development for a remote inspection robot in nuclear power plants

    International Nuclear Information System (INIS)

    Mizuno, M.; Ohnuma, M.; Hamada, K.; Mizutani, T.; Shimada, A.; Segawa, M.; Kubo, K.

    1984-01-01

    A remote operated robot system has been developed for inspection inside the primary containment vessel (PCV) of nuclear power plants. This system consists of an inspection vehicle, a monorail driving system, a signal transmission system, a power supply system and an operator console.. The system has two main features. First is that the operator can transfer the vehicle at any time from outside the PCV to inside or vice versa through a personnel airlock. The second feature is that the vehicle can be transported from one inspection route to another route at junction points. A prototype inspection robot system was fabricated on a trial basis. Running and inspection performances were confirmed utilizing actual size test apparatus

  6. Strategy of Risk-Informed Inspection for Secondary Systems in NPPs

    International Nuclear Information System (INIS)

    Kim, So Young; Heo, Gyun Young

    2012-01-01

    Recently, unexpected accidents such as large-scale blackout have been occurred due to increasing demand of electricity. The unplanned trips have great influence over the economics although they rarely affect the safety of system. Because the cost for inspection and maintenance is limited, it is beneficial not only economically to take follow-up action in a timely manner to prevent plant trip but also in safety by protecting against the risk which is occurred from trip. In nuclear power plants (NPPs), the importance about risk-informed service such as inspection, maintenance and replacement is becoming on the rise. Risk-informed techniques such as in-service test, in-service inspection, design guide change and etc. are already used in nuclear field but these techniques are applied focusing on primary system for safety-related regulatory issues. It is needed to consider the optimization of inspection informed risk for entire plant including secondary system which is not applied enough. The study about risk-based inspection for boilers in thermal power field is in progress actively, but not for turbine cycle, which is similar with nuclear industry. Today, the most of inspections or tests for turbine cycle are time-based maintenance, being performed on time. It is required to perform condition-based maintenance by evaluating risk analyzing both of probability and consequence simultaneously about damage mechanisms that can be predicted by equipment or devices configuring the secondary system. Probability of failure (POF) is analyzed in terms of materials' ageing mechanisms, but consequence of failure (COF) should be evaluated in terms of thermohydraulic condition then it is needed to check power loss and period of maintenance. This paper is going to propose the idea to quantify the consequence of failure using the fault tree and simulation for secondary system, and propose quantitative risk-informed inspection by these approaches

  7. NDT reliability in the organizational context of service inspection companies

    International Nuclear Information System (INIS)

    Holstein, Ralf; Bertovic, Marija; Kanzler, Daniel; Mueller, Christina

    2014-01-01

    The focus of NDT reliability research in the past was in the field of two high risk industries: (atomic) power plants and aircrafts. The responsible organizations have been well aware of the risks and founded projects to understand and optimize critical steps during production, operation and maintenance. But the use of NDT is not limited to these two fields. The risks during operation of chemical plants, trains or windmills are different from the area above but evident. The coverage by legal regulations is relatively low. Instead of this owner responsibility, product liability and financial issues are the driving forces to do inspections and to use non-destructive testing. The different targets and financial issues influence the practice of NDT-inspections. A survey of this practice and its results are shown. (orig.)

  8. Auxiliary feedwater system risk-based inspection guide for the South Texas Project nuclear power plant

    International Nuclear Information System (INIS)

    Bumgardner, J.D.; Nickolaus, J.R.; Moffitt, N.E.; Gore, B.F.; Vo, T.V.

    1993-12-01

    In a study sponsored by the US Nuclear Regulatory Commission (NRC), Pacific Northwest Laboratory has developed and applied a methodology for deriving plant-specific risk-based inspection guidance for the auxiliary feedwater (AFW) system at pressurized water reactors that have not undergone probabilistic risk assessment (PRA). This methodology uses existing PRA results and plant operating experience information. Existing PRA-based inspection guidance information recently developed for the NRC for various plants was used to identify generic component failure modes. This information was then combined with plant-specific and industry-wide component information and failure data to identify failure modes and failure mechanisms for the AFW system at the selected plants. South Texas Project was selected as a plant for study. The product of this effort is a prioritized listing of AFW failures which have occurred at the plant and at other PWRs. This listing is intended for use by the NRC inspectors in preparation of inspection plans addressing AFW risk important components at the South Texas Project plant

  9. Auxiliary feedwater system risk-based inspection guide for the H. B. Robinson nuclear power plant

    International Nuclear Information System (INIS)

    Moffitt, N.E.; Lloyd, R.C.; Gore, B.F.; Vo, T.V.; Garner, L.W.

    1993-08-01

    In a study sponsored by the US Nuclear Regulatory Commission (NRC), Pacific Northwest Laboratory has developed and applied a methodology for deriving plant-specific risk-based inspection guidance for the auxiliary feedwater (AFW) system at pressurized water reactors that have not undergone probabilistic risk assessment (PRA). This methodology uses existing PRA results and plant operating experience information. Existing PRA-based inspection guidance information recently developed for the NRC for various plants was used to identify generic component failure modes. This information was then combined with plant-specific and industry-wide component information and failure data to identify failure modes and failure mechanisms for the AFW system at the selected plants. H. B. Robinson was selected as one of a series of plants for study. The product of this effort is a prioritized listing of AFW failures which have occurred at the plant and at other PWRs. This listing is intended for use by NRC inspectors in the preparation of inspection plans addressing AFW risk-important components at the H. B. Robinson plant

  10. Auxiliary feedwater system risk-based inspection guide for the J.M. Farley Nuclear Power Plant

    International Nuclear Information System (INIS)

    Vo, T.V.; Pugh, R.; Gore, B.F.; Harrison, D.G.

    1990-10-01

    In a study sponsored by the US Nuclear Regulatory Commission (NRC), Pacific Northwest Laboratory has developed and applied a methodology for deriving plant-specific risk-based inspection guidance for the auxiliary feedwater (AFW) system at pressurized water reactors that have not undergone probabilistic risk assessment(PRA). This methodology uses existing PRA results and plant operating experience information. Existing PRA-based inspection guidance recently developed for the NRC for various plants was used to identify generic component failure modes. This information was then combined with plant-specific and industry-wide component information and failure data to identify failure modes and failure mechanisms for the AFW system at the selected plants. J. M. Farley was selected as the second plant for study. The product of this effort is a prioritized listing of AFW failures which have occurred at the plant and at other PWRs. This listing is intended for use by NRC inspectors in the preparation of inspection plans addressing AFW risk-important at the J. M. Farley plant. 23 refs., 1 fig., 1 tab

  11. Results from the Nuclear Plant Aging Research Program: Their use in inspection activities

    Energy Technology Data Exchange (ETDEWEB)

    Gunther, W.; Taylor, J. (Brookhaven National Lab., Upton, NY (USA))

    1990-09-01

    The US NCR's Nuclear Plant Aging Research (NPAR) Program has determined the susceptibility to aging of components and systems, and the potential for aging to impact plant safety and availability. The NPAR Program also identified methods for detecting and mitigating aging in components. This report describes the NPAR results which can enhance NRC inspection activities. Recommendations are provided for communicating pertinent information to NRC inspectors. These recommendations are based on a detailed assessment of the NRC's Inspection Program, and feedback from resident and regional inspectors as described within. Examples of NPAR report summaries and aging inspection guides for components and systems are included. 13 refs., 3 figs., 4 tabs.

  12. 78 FR 22151 - Fees for Official Inspection and Official Weighing Services Under the United States Grain...

    Science.gov (United States)

    2013-04-15

    ... Inspection Service (FGIS) with the authority to charge and collect reasonable fees to cover the cost of performing official services. The fees also cover the costs associated with managing the program. After a... associated administrative and supervisory costs. The fees for official inspection and weighing services were...

  13. The use of NPAR [Nuclear Plant Aging Research] results in plant inspection activities

    International Nuclear Information System (INIS)

    Gunther, W.; Taylor, J.

    1989-01-01

    The US NRC's Nuclear Plant Aging Research (NPAR) Program is a hardware oriented research program which has produced a large data base of equipment and system operating, maintenance, and testing information. Equipment and systems which have a propensity for age related degradation are identified, and methods for detecting and mitigating aging effects have been evaluated. As plants age, it becomes increasingly important that NRC inspectors be cognizant of plant aging phenomena. This paper describes the NPAR information which can enhance inspection activities, and provides a mechanism for making pertinent research available to the inspectors. 7 refs., 2 figs

  14. Managing aging in nuclear power plants: Insights from NRC's Maintenance Team Inspection reports

    International Nuclear Information System (INIS)

    Fresco, A.; Subudhi, M.

    1992-01-01

    A plant's maintenance program is the principal vehicle through which age-related degradation is managed. From 1988 to 1991, the NRC evaluated the maintenance program of every nuclear power plant in the United States. Forty-four out of a total of sixty-seven of the reports issued on these in-depth team inspections have been reviewed for insights into the strengths and weaknesses of the programs as related to the need to understand and manage the effects of aging on nuclear plant structures, systems, and components (SSCs). Relevant information has been extracted from these inspection reports sorted into several categories; including Specific Aging Insights, Preventive Maintenance, Predictive Maintenance and Condition Monitoring, Post Maintenance Testing, Failure Trending, Root Cause Analysis and Usage of Probabilistic Risk Assessment in the Maintenance Process. Specific examples of inspection and monitoring techniques successfully used by utilities to detect degradation due to aging have been identified

  15. In-service diagnostic systems of steam generators, pressurizers and other components of WWER type nuclear power plants

    International Nuclear Information System (INIS)

    Matal, O.

    1988-01-01

    A detailed description is presented of the systems of vibration inspections and systems of determining residual service life, implemented as in-service diagnostic systems for steam generators and pressurizers at the Dukovany nuclear power plant. Low temperature accelerometers of the KD or KS type and high temperature accelerometers CA 91 are used as vibration sensors. In the system of vibration inspection a total of 64 vibration measuring chains of Czechoslovak make and design are installed in the power plant. Systems are being built for determining residual service life which consist of 75 special chains for heat monitoring with thermocouples installed on selected assemblies of the steam generators and the pressurizers serving to monitor and evaluate heat stress. Also included in the system for determining residual service life are 16 routes for water withdrawal from steam generators. Their purpose is to make in-service determinations of places of biggest concentrations of impurities in secondary water, to determine the biggest local chemical exposure of primary collector and heat exchange tube materials and to optimize the size and place of leachate withdrawal. (Z.M.). 2 figs., 2 tabs., 15 refs

  16. Regulatory Inspection of Nuclear Power Plants in NEA Member Countries

    International Nuclear Information System (INIS)

    1978-01-01

    Based on the replies to a questionnaire, this report gives a description and comparative evaluation of the regulatory inspection activities in several NEA Member countries. The questionnaire which was circulated to all Member countries requested details on the organisation, system, scope and objectives of nuclear regulatory inspection and the effort required throughout all stages of the life of a nuclear plant including the use of independent bodies or consultants. Additional information was requested on the documentation concerned with regulatory inspections, incident and accident reporting procedures, and the duties, powers and bases for recruitment of regulatory personnel with the object of covering all related aspects. However, because of the differences in national practices and perhaps in the interpretation of the questionnaire, it proved to be extremely difficult to make an evaluation and comparison of inspection activities and effort involved in these Member countries. This report, which includes a section on the nuclear power programme in Member countries, should therefore only be regarded as an initial review but it provides a useful contribution to the exchange of experience and views on regulatory inspection practices

  17. Auxiliary feedwater system risk-based inspection guide for the Byron and Braidwood nuclear power plants

    International Nuclear Information System (INIS)

    Moffitt, N.E.; Gore, B.F.; Vo, T.V.

    1991-07-01

    In a study sponsored by the US Nuclear Regulatory Commission (NRC), Pacific Northwest Laboratory has developed and applied a methodology for deriving plant-specific risk-based inspection guidance for the auxiliary feedwater (AFW) system at pressurized water reactors that have not undergone probabilistic risk assessment (PRA). This methodology uses existing PRA results and plant operating experience information. Existing PRA-based inspection guidance information recently developed for the NRC for various plants was used to identify generic component failure modes. This information was then combined with plant-specific and industry-wide component information and failure data to identify failure modes and failure mechanisms for the AFW system at the selected plants. Byron and Braidwood were selected for the fourth study in this program. The produce of this effort is a prioritized listing of AFW failures which have occurred at the plants and at other PWRs. This listing is intended for use by NRC inspectors in the preparation of inspection plans addressing AFW risk-important components at the Byron/Braidwood plants. 23 refs., 1 fig., 1 tab

  18. A study on the crack inspection signal characteristics for power plant components by phased array UT

    International Nuclear Information System (INIS)

    Cho, Yong Sang; Lim, Sang Gyu; Kil, Du Song

    2001-01-01

    Phased array ultrasonic testing system has become available for practical application in complicated geometry such as turbine blade root, tenon, disc in power industry. This research describes the characteristics of phased array UT signal for various type of blade roots in thermal Power Plant turbines. This application of Phased array ultrasonic testing system has been promoted mainly to save inspection time and labor cost of turbine inspection. The characteristic of phase array UT signal for power plant component is very simple to understand but to difficult for perform the inspection. Since our sophisticated inspection technique and systems are essential for the inspection of steam turbine blade roots that require high reliability, we intend to develop new technology and improve phased array technique based on the wide and much experience for the inspection of turbine components.

  19. Interaction between periodic in-service inspection requirements and design

    International Nuclear Information System (INIS)

    Prot, A.C.; Saglio, R.

    1979-03-01

    After reviewing the requirements specific of periodic In-Service Inspection related to safety problems, especially for the pressure vessels, and taking into account the experience gained with several PWR reactors, the authors show these requirements could lead to modify the primary circuit design

  20. Periodic inspections of lightning protection systems in intermediate storage facilities of nuclear technological plants

    International Nuclear Information System (INIS)

    Witzel, Andre; Schulz, Olav

    2013-01-01

    Especially for nuclear technological plants, periodic inspections of lightning protection systems are of great importance. This article shows the sequence of maintenance programs using the examples of the intermediate storage facilities of the nuclear technological plants Grohnde and Unterweser as well as the central intermediate storage facility in Gorleben and gives a description of the extensive measures of inspecting the external and internal lightning protection and the global earth termination system.

  1. The use of NPAR results in plant inspection activities

    International Nuclear Information System (INIS)

    Gunther, W.; Taylor, J.

    1990-01-01

    The US Nuclear Regulatory Commission's (NRC's) Nuclear Plant Aging Research (NPAR) Program is a hardware oriented research program which has produced a large data base of equipment and system operating, maintenance, and testing information. Equipment and systems which have a propensity for age related degradation are identified, and methods for detecting and mitigating aging effects have been evaluated. As plants age, it becomes increasingly important that NRC inspectors be cognizant of plant aging phenomena. This paper describes the NPAR information which can enhance inspection activities, and provides a mechanism for making pertinent research available to the inspectors

  2. Some reliability targets affecting the necessary provisions for in-service inspection and monitoring of LMFBR engineering components

    International Nuclear Information System (INIS)

    Bolt, P.R.

    1980-01-01

    The possible consequences of failure of primary and secondary sodium circuit components are discussed with particular reference to post incident fault diagnosis, remedial procedures and outage durations. The core support structures and steam generator units are identified as particularly important components in terms of economic consequence of their failure. Important safety considerations may also apply. Levels of reliability for core support and steam generator integrity, necessary to meet economic and certain safety criteria, are discussed and quantitative data is given. Possible failure and deterioration mechanisms which could result in unacceptable reductions in reliability are then identified for the core support and steam generator units. Following a consideration of the reliability targets and possible causes of loss of reliability, an appraisal is made of the necessary extent of in-service data to be obtained on component behaviour and condition. In-service inspection and monitoring methods that could be used to obtain this data are described. Consideration is given to UK and overseas inspection experience on LMFBR and other nuclear plant. (author)

  3. Some reliability targets affecting the necessary provisions for in-service inspection and monitoring of LMFBR engineering components

    Energy Technology Data Exchange (ETDEWEB)

    Bolt, P R [Fast Reactor Engineering, Plant Engineering Department, CEGB, Barnwood, Gloucester (United Kingdom)

    1980-11-01

    The possible consequences of failure of primary and secondary sodium circuit components are discussed with particular reference to post incident fault diagnosis, remedial procedures and outage durations. The core support structures and steam generator units are identified as particularly important components in terms of economic consequence of their failure. Important safety considerations may also apply. Levels of reliability for core support and steam generator integrity, necessary to meet economic and certain safety criteria, are discussed and quantitative data is given. Possible failure and deterioration mechanisms which could result in unacceptable reductions in reliability are then identified for the core support and steam generator units. Following a consideration of the reliability targets and possible causes of loss of reliability, an appraisal is made of the necessary extent of in-service data to be obtained on component behaviour and condition. In-service inspection and monitoring methods that could be used to obtain this data are described. Consideration is given to UK and overseas inspection experience on LMFBR and other nuclear plant. (author)

  4. Summary of inspection findings of licensee inservice testing programs at United States commercial nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Dunlop, A.; Colaccino, J.

    1996-12-01

    Periodic inspections of pump and valve inservice testing (IST) programs in United States commercial nuclear power plants are performed by Nuclear Regulatory Commission (NRC) Regional Inspectors to verify licensee regulatory compliance and licensee commitments. IST inspections are conducted using NRC Inspection Procedure 73756, {open_quotes}Inservice Testing of Pumps and Valves{close_quotes} (IP 73756), which was updated on July 27, 1995. A large number of IST inspections have also been conducted using Temporary Instruction 2515/114, {open_quotes}Inspection Requirements for Generic Letter 89-04, Acceptable Inservice Testing Programs{close_quotes} (TI-2515/114), which was issued January 15, 1992. A majority of U.S. commercial nuclear power plants have had an IST inspection to either IP 73756 or TI 2515/114. This paper is intended to summarize the significant and recurring findings from a number of these inspections since January of 1990.

  5. Regulatory inspection activities related to inspection planning, plant maintenance and assessment of safety. Proceedings of an international workshop

    International Nuclear Information System (INIS)

    Van Binnebeek, J.J.; Aubrey, Richard; Grandame, Melvyn; Aro, Ilari; Balloffet, Yves; Klonk, Hartmut; Manzella, Pietro; Koizumi, Hiroyoshi; Bouvrie, E.C. des; Forsberg, Staffan; Lang, Hans-Guenter; Mehew, Robert; Warren, Thomas; Woodhouse, Paul; Gallo, Robert M.; Campbell, Rob; )

    1997-01-01

    The NEA Committee on Nuclear Regulatory Activities (CNRA) believes that an essential factor in ensuring the safety of nuclear installations is the continuing exchange and analysis of technical information and data. To facilitate this exchange the Committee has established Working Groups and Groups of Experts in specialised topics. CNRA believes that safety inspections are a major element in the regulatory authority's efforts to ensure the safe operation of nuclear facilities. Considering the importance of these issues, the Committee has established a special Working Group on Inspection Practices (WGIP). The purpose of WGIP, is to facilitate the exchange of information and experience related to regulatory safety inspections between CNRA Member countries. This was the 3. international workshop held by the WGIP on regulatory inspection activities. The focus of this workshop was on 3 main topics; Inspection Planning, Plant Maintenance and Assessment of Safety. This document presents the proceedings from the workshop, including: workshop programme, results and conclusions, papers and presentations and the list of participants. The main purpose of the Workshop is to provide a forum of exchange of information on the regulatory inspection activities

  6. Regulatory inspection activities related to inspection planning, plant maintenance and assessment of safety. Proceedings of an international workshop

    Energy Technology Data Exchange (ETDEWEB)

    Van Binnebeek, J. J. [AIB-Vincotte Nuclear - AVN, Avenue du Roi, 157, B-1060 Brussels (Belgium); Aubrey, Richard; Grandame, Melvyn [Atomic Energy Control Board - AECB, P.O. Box 1046, Station B, 280 Slater Street, Ottawa, Ontario K1P 5S9 (Canada); Aro, Ilari [Finnish Centre for Radiation and Nuclear Safety - STUK, P.O. Box 14, FIN-00881 Helsinki (Finland); Balloffet, Yves [DRIRE Rhone Alpes, 146, rue Pierre Corneille, 69426 Lyon CEDEX 03 (France); Klonk, Hartmut [Bundesamt fuer Strahlenschutz - BfS, Federal Office for Radiation Protection, Postbox 10 01 49, 38201 Salzgitter 1 (Germany); Manzella, Pietro [A.N.P.A., Via V. Brancati, 48, 1-00144 Roma EUR (Italy); Koizumi, Hiroyoshi [Tech. Stan. Dept. - JAPEIC, Shin-Toranomon Bldg., 1-5-11, Akasaka, Minato-ku, Tokyo 107 (Japan); Bouvrie, E.C. des [Ministry of Social Affairs and Employment, Nuclear Safety Dept. KFD, P.O. Box 90804, 2509 LV The Hague (Netherlands); Forsberg, Staffan [Swedish Nuclear Power Inspectorate - SKI, Klarabergsviadukten 90, S-10658 Stockholm (Sweden); Lang, Hans-Guenter [Section Plant Coordination and Inspection, Swiss Federal Nuclear Safety Inspectorate - HSK, CH-5232 Villigen-HSK (Switzerland); Mehew, Robert; Warren, Thomas; Woodhouse, Paul [Health and Safety Executive - NII, St. Peter' s House, Balliol Road, Bootle, Merseyside L20 3LZ (United Kingdom); Gallo, Robert M. [Special Inspection Branch, US Nuclear Regulatory Commission - US NRC, Mail Stop 0-9A1, Washington, DC 20555 (United States); Campbell, Rob [International Atomic Energy Agency - IAEA, P.O. Box 100, A-1400 Vienna (International Atomic Energy Agency (IAEA))

    1997-07-01

    The NEA Committee on Nuclear Regulatory Activities (CNRA) believes that an essential factor in ensuring the safety of nuclear installations is the continuing exchange and analysis of technical information and data. To facilitate this exchange the Committee has established Working Groups and Groups of Experts in specialised topics. CNRA believes that safety inspections are a major element in the regulatory authority's efforts to ensure the safe operation of nuclear facilities. Considering the importance of these issues, the Committee has established a special Working Group on Inspection Practices (WGIP). The purpose of WGIP, is to facilitate the exchange of information and experience related to regulatory safety inspections between CNRA Member countries. This was the 3. international workshop held by the WGIP on regulatory inspection activities. The focus of this workshop was on 3 main topics; Inspection Planning, Plant Maintenance and Assessment of Safety. This document presents the proceedings from the workshop, including: workshop programme, results and conclusions, papers and presentations and the list of participants. The main purpose of the Workshop is to provide a forum of exchange of information on the regulatory inspection activities.

  7. Fuel channel in-service inspection programs program design for maximum cost effectiveness

    International Nuclear Information System (INIS)

    Van den Brekel, N.C.

    1995-01-01

    Inspection is an integral part of fuel channel life management strategy. Inspection data is used to assess the state of reactor core integrity and provide the information necessary to optimize long term maintenance programs. This paper will provide an overview of the structured approach to developing fuel channel inspection programs within OHN. The inspection programs are designed to balance the resources utilized (cost, outage time, and dose expenditure) with the benefits provided by the inspection data obtained (improved knowledge of component status, degradation mechanisms and rates, etc..). The CANDU community has yet to have a fuel channel operate for a full 30 year design life. Since research programs can not fully simulate reactor operating conditions, inspections become an essential feature of the life management strategy as the components age. Inspection programs often include activities designed to develop predictive capability for long term fuel channel behaviour and provide early warning of changes in behaviour. It should be noted that although this paper addresses the design of fuel channel inspection programs, the basic principles presented can be applied to the design of inspection programs for any major power plant component or system. (author)

  8. A pilot application of risk-based methods to establish in-service inspection priorities for nuclear components at Surry Unit 1 Nuclear Power Station

    International Nuclear Information System (INIS)

    Vo, T.; Gore, B.; Simonen, F.; Doctor, S.

    1994-08-01

    As part of the Nondestructive Evaluation Reliability Program sponsored by the US Nuclear Regulatory Commission, the Pacific Northwest Laboratory is developing a method that uses risk-based approaches to establish in-service inspection plans for nuclear power plant components. This method uses probabilistic risk assessment (PRA) results and Failure Modes and Effects Analysis (FEMA) techniques to identify and prioritize the most risk-important systems and components for inspection. The Surry Nuclear Power Station Unit 1 was selected for pilot applications of this method. The specific systems addressed in this report are the reactor pressure vessel, the reactor coolant, the low-pressure injection, and the auxiliary feedwater. The results provide a risk-based ranking of components within these systems and relate the target risk to target failure probability values for individual components. These results will be used to guide the development of improved inspection plans for nuclear power plants. To develop inspection plans, the acceptable level of risk from structural failure for important systems and components will be apportioned as a small fraction (i.e., 5%) of the total PRA-estimated risk for core damage. This process will determine target (acceptable) risk and target failure probability values for individual components. Inspection requirements will be set at levels to assure that acceptable failure probabilistics are maintained

  9. In service inspection for Superphenix vessels development of ultrasonic techniques available at high temperature

    International Nuclear Information System (INIS)

    Gondard, C.

    1983-12-01

    The main and safety vessels of SUPERPHENIX 1 were designed to allow in-service inspections. The remote controlled inspection device MIR was developped for this purpose. The ultrasonic examination has required the development of all new transducers fitted with severe operating conditions prevailing in intervessels interval. A list of problems to be resolved and technological solutions which were found is given. Measurements of acoustical properties on actual probes are compared with theoretical values. It appears that concordance is good and that an in-service inspection using high temperature transducers is possible with a good spatial resolution and signal to noise ratio

  10. 9 CFR 93.218 - Import permits and applications for inspection for poultry.

    Science.gov (United States)

    2010-01-01

    ... inspection for poultry. 93.218 Section 93.218 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE EXPORTATION AND IMPORTATION OF ANIMALS (INCLUDING POULTRY) AND ANIMAL PRODUCTS IMPORTATION OF CERTAIN ANIMALS, BIRDS, FISH, AND POULTRY, AND CERTAIN ANIMAL, BIRD, AND POULTRY...

  11. Inter-vessels in-service inspection of Super-Phenix

    International Nuclear Information System (INIS)

    Asty, M.; Saglio, R.; Viard, J.; Lerat, B.

    1984-01-01

    The vessels design of fast breeder reactor Super-Phenix enables inspection during operating time. A self-moving machine -MIR- has been built up especially for that purpose. It is able to carry out visual and ultrasonorous inspection. MIR structure is that of a tetrahedron, all tops of which are fitted with two wheels, as for traction and direction. The wheels are leaning on booth the two vessels. Thanks to a computer-assisted control system, MIR is able to move along in every part of the inter-vessels space. Studies have been carried on at the French Commissariat a l'Energie Atomique, by two Sections of the advanced technologies Service. After outlining MIR working conditions, its main characteristics are described [fr

  12. Evaluation of the degradation of the service water system in nuclear plants

    International Nuclear Information System (INIS)

    Salaices A, E.

    2003-01-01

    The service water system, the circulation water system, the cooling water system and the protection against fires system so much in nuclear plants as in fossils plants they are being degraded by a wide variety of mechanisms. These mechanisms include microbiologically influenced corrosion, cavitation, erosion-corrosion, erosion by solid particles, corrosion in cracks, stings, general corrosion, galvanic corrosion, sedimentation and obstructions and incrustations in the heat exchangers. In the last years were developed predictive models for the more common degradation forms and were installed in a new application of the CHECWORKS TM code called Cooling Water Application (CWA). This application of the code provides a new technology that so much nuclear facilities as fossil ones can use to modelling specific systems and to carry out corrosion predictions in each one of its components. Presently work the results of the employment of the CHECWORKS CWA code are described to carry out predictions of 12 different corrosion mechanisms that affect to the service water system of a nuclear plant, as well as the recommendations and options that the plant can to consider to reduce indexes of damages. This work can be used for to optimize inspections to the service water system and it gives the bases for similar changes in other nuclear plants. (Author)

  13. MIR: an in-service inspection device for Superphenix 1 vessels

    International Nuclear Information System (INIS)

    Asty, M.; Ceccato, S.; Lerat, B.; Viard, J.

    1986-06-01

    The main and safety vessels of SUPERPHENIX 1 were designed to allow in-service inspections. The remote controlled inspection device MIR was developed for this purpose. It allows both visual and ultrasonic examinations to be performed. Basically, MIR consists of a tetrahedral structure provided with four steering and traction wheels, two for each vessel. A computer assisted control system enables it to be driven to any position on either the main or safety vessels. Operating conditions are briefly reviewed and the main features of MIR presented

  14. Risk informed inservice inspection evaluation of the ComEd nuclear plants

    International Nuclear Information System (INIS)

    Fleming, K.N.; Hutchinson, J.J.

    2000-01-01

    In November, 1999 Commonwealth Edison Company began the largest scope project yet performed to implement risk informed in-service inspection programs for piping systems. A contractor team led by ERIN Engineering and Research was selected to perform full scope risk informed evaluations on ten reactor units at five sites including 3 BWR and 2 PWR stations. This risk informed evaluation has applied a number of advancements to RISI technology in key areas including risk quantification of inspection program changes, element selection, treatment of multiple damage mechanisms at a given location, and in streamlining an approach to RISI initially developed by EPRI. The scope of the evaluation covered more than 18,000 ASME Class 1 and 2 welds not counting those that will continue to be inspected as part of augmented programs for flow accelerated corrosion, stress corrosion cracking, and service water systems. When the current ASME Section XI based exams are replaced by the risk informed program, while some new inspection locations will be added, substantial cost savings and person-rem exposures are projected from the elimination of most of the current exams. ComEd expects to recover its investment in the RISI evaluation for each of the 10 reactor units in 1 to 2 refueling outages, from the cost savings of reduced inspections. At the same time, the risk of a severe accident due to pipe ruptures is not expected to exhibit significant changes. (author)

  15. Inspection during operation of a nuclear power plant in Spain

    International Nuclear Information System (INIS)

    Gutierrez Bernal, R.

    1977-01-01

    The control and surveillance activities, as well as the operating data and results of the three nuclear power plants presently in operation: Jose Cabrera, Santa Maria de Garona and Vandellos, are summarized. The first two are light-water type, with different pressure and boiling characteristics and the third is of the gas-graphite type. The main aspects, from an inspection point of view, of the experience obtained in these three plants are analyzed. (author) [es

  16. Inspection of Chooz power plant after ten years operation

    International Nuclear Information System (INIS)

    Saglio, Robert.

    1978-01-01

    This report is intended to discuss the results from the complete technical audit of the vessel effected in 1976 at the Ardennes reactor (CNA 305 MWe). This audit had a special character as far as this power plant has never been inspected before: the start-up had taken place in 1967 and was then prior to the development of French regulations (and even to the first version of the ASME code, Section XI). In that time, no inspection was expected; it has yet been possible to have a complete audit in ten days. The automatic start-up of focused ultrasonic testing so appeared to have reached the required reliability and a good sensitivity [fr

  17. Advanced Visualization Software System for Nuclear Power Plant Inspection

    International Nuclear Information System (INIS)

    Kukic, I.; Jambresic, D.; Reskovic, S.

    2006-01-01

    Visualization techniques have been widely used in industrial environment for enhancing process control. Traditional techniques of visualization are based on control panels with switches and lights, and 2D graphic representations of processes. However, modern visualization systems enable significant new opportunities in creating 3D virtual environments. These opportunities arise from the availability of high end graphics capabilities in low cost personal computers. In this paper we describe implementation of process visualization software, developed by INETEC. This software is used to visualize testing equipment, components being tested and the overall power plant inspection process. It improves security of the process due to its real-time visualization and collision detection capabilities, and therefore greatly enhances the inspection process. (author)

  18. Demonstration test of in-service inspection methods

    International Nuclear Information System (INIS)

    Takumi, Kenji

    1987-01-01

    The major objectives of the project are: (1) to demonstrate the reliability of a manual ultrasonic flaw detector and techniques that are used in operating light water reactor plants and (2) to demonstrate the performance and reliability of an automatic ultrasonic flaw detector that is designed to shorten the time required for ISI work and reduce the exposure risk of inspection personnel. The test project consists of three stages. In the first stage, which ended in 1982, defects were added intentionally to a model structure the same in size as a typical 1.1 million kW BWR plant and manual ultrasonic flaw detection tensting was performed. In the second stage, completed in 1984, automatic eddy-current flaw detection testing was carried out for defects in heat transfer piping of a PWP steam generator. In the third stage, which started in 1981 and ended in March 1987, a newly developed automatic ultrasonic flaw detector is applied to testing of defects used for the manual detector performance evaluation. Results have shown that the automatic eddy-current flaw detector under test has an adequately stable performance for practical uses, with a very high reproducibility to permit close inspection of secular deterioration in heat transfer pipes. It has also revealed that both the manual and automatic ultrasonic flaw detectors under test can detect all defects that do not comply with the ASME standards. (Nogami, K.)

  19. Development of video probe system for inspection of feeder pipe support in calandria reactor

    International Nuclear Information System (INIS)

    Cho, Jai Wan; Lee, Nam Ho; Choi, Young Soo

    2000-07-01

    There are 760 feederpipes, which they are connected to inlet/outlet of the 380 pressure tube channels on the front of the calandria, in CANDU-type Reactor of Wolsung Nuclear Power Plant. As an ISI(In-Service Inspection) and PSI (Post- Service Inspection) requirements, maintenance activities of measuring the thickness of curvilinear part of feederpipe and inspecting the feederpipe support area within calandria are needed to ensure continued reliable operation of nuclear power plant. And untrasonic probe is used to measure the thickness of curvilinear part of feederpipe, however workers are exposed to radioactivity irradiation during the measurement period. But, it is impossible to inspect feederpipe support area thoroughlv because of narrow and confined accessibility, that is, an inspection space between the pressure tube channels is less than 100mm and pipes in feederpipe support area are congested. And also, workers involved in inspecting feederpipe support area are under the jeopardy of high-level radiation exposure. Concerns about sliding home, which make the move of feederpipe connected to pressure tube channel smooth as pressure tube expands and contracts in its axial direction, stuck to feederpipe support and some of the structural components have made necessary the development of video inspection probe system with narrow and confined accessibility to observe and inspect feederpipe support area more close. Using video inspection probe system, it is possible to inspect and repair abnormality of feederpipe support connected to pressure tube channels of the calandria more accurate and quantative than naked eye. Therefore, that will do much for ensuring safety of CANDU-type nuclear power plant

  20. 78 FR 65007 - Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 3

    Science.gov (United States)

    2013-10-30

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 052-00026; NRC-2008-0252] Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 3 AGENCY: Nuclear Regulatory Commission. ACTION: Determination of inspections, tests, analyses, and acceptance criteria completion...

  1. Development of the Inspection and Diagnosis Technology for the NSSS Components Integrity

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jae Hee; Eom, Heung Soup; Lee, Jae Cheol and others

    2005-02-15

    This project aims at the development of new technologies for a monitoring, inspection, diagnosis and evaluation of the safety related components in nuclear power plants. These technologies are required to detect the defects in the components of nuclear power plants and to prepare thoroughly against accidents. We performed the 1st stage of the study on the four issues recently focused. Thus we developed an analysis model of dynamic characteristics on the reactor internals, an on-line monitoring technology using an ultrasonic guided wave, a network based remote inspection system and an inspection robot for a control rod guide tube support pin. We also performed a lifetime estimation and degradation analysis of the NPP cables through accelerated degradation tests. The technologies developed in this project are applied to the components of nuclear power plants. The applications include a localization of the NSSS integrity monitoring system, replacement of an in-service inspection by on-line monitoring, remote inspection of the major components of the plants, lifetime estimation of the degraded plant cables, and so on. Elemental technologies obtained through the project can have great ripple effects in general industry, and can be applied to the inspection and diagnosis of the components in the other industries.

  2. Development of the Inspection and Diagnosis Technology for the NSSS Components Integrity

    International Nuclear Information System (INIS)

    Kim, Jae Hee; Eom, Heung Soup; Lee, Jae Cheol and others

    2005-02-01

    This project aims at the development of new technologies for a monitoring, inspection, diagnosis and evaluation of the safety related components in nuclear power plants. These technologies are required to detect the defects in the components of nuclear power plants and to prepare thoroughly against accidents. We performed the 1st stage of the study on the four issues recently focused. Thus we developed an analysis model of dynamic characteristics on the reactor internals, an on-line monitoring technology using an ultrasonic guided wave, a network based remote inspection system and an inspection robot for a control rod guide tube support pin. We also performed a lifetime estimation and degradation analysis of the NPP cables through accelerated degradation tests. The technologies developed in this project are applied to the components of nuclear power plants. The applications include a localization of the NSSS integrity monitoring system, replacement of an in-service inspection by on-line monitoring, remote inspection of the major components of the plants, lifetime estimation of the degraded plant cables, and so on. Elemental technologies obtained through the project can have great ripple effects in general industry, and can be applied to the inspection and diagnosis of the components in the other industries

  3. QUALITY MANAGEMENT IN EDUCATIONAL INSPECTION SERVICES: ADAPTATION TO THE EFQM EXCELLENCE MODEL

    Directory of Open Access Journals (Sweden)

    Alberto José Hontañón Talledo

    2014-12-01

    Full Text Available The main purpose of this project work is to facilitate reflection on the incorporation of rigurous data gathering oriented to the decision making in order to improve the procedure carried out by the Educational Inspection Services, its operation and its results. By my understanding, due to their direct connection with the improvement in teaching practice, this improvement will thereupon result in significant benefits to education, the educational system and society itself. Throughout the project work, an approach to quality management is applied to improve the impact of the actions carried out by the Educational Inspection Services and a practical proposal, which sets out to encourage reflection in order to bent on change, is achieved together with a continuous improvement in the school supervision services themselves.

  4. Development of the Inspection and Diagnosis Technology for the NSSS Components Integrity

    International Nuclear Information System (INIS)

    Kim, Jae Hee; Eom, Heung Soup; Lee, Jae Cheol

    2007-02-01

    This project is to develop and demonstrate new technologies for a monitoring, inspection, diagnosis and evaluation of the safety related components in nuclear power plants. These technologies are required to detect the defects in the components of nuclear power plants and to prepare thoroughly against accidents. We studied on the four issues recently focused. Thus we developed an impact analysis model of the reactor and steam generator, and diagnosis software of the reactor internals. As an on-line monitoring technology using an ultrasonic guided wave, we developed a new method enhancing the S/N ratio of the weak signal based on time reversal technique. A network based remote inspection system and an inspection robot for reactor vessel head penetration was developed. We also performed a lifetime estimation and degradation analysis of the NPP cables through accelerated degradation tests. The technologies developed in this project are applied to the components of nuclear power plants. The applications include a localization of the NSSS integrity monitoring system, replacement of an in-service inspection by on-line monitoring, remote inspection of the major components of the plants, lifetime estimation of the degraded plant cables, and so on

  5. Development of the Inspection and Diagnosis Technology for the NSSS Components Integrity

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jae Hee; Eom, Heung Soup; Lee, Jae Cheol (and others)

    2007-02-15

    This project is to develop and demonstrate new technologies for a monitoring, inspection, diagnosis and evaluation of the safety related components in nuclear power plants. These technologies are required to detect the defects in the components of nuclear power plants and to prepare thoroughly against accidents. We studied on the four issues recently focused. Thus we developed an impact analysis model of the reactor and steam generator, and diagnosis software of the reactor internals. As an on-line monitoring technology using an ultrasonic guided wave, we developed a new method enhancing the S/N ratio of the weak signal based on time reversal technique. A network based remote inspection system and an inspection robot for reactor vessel head penetration was developed. We also performed a lifetime estimation and degradation analysis of the NPP cables through accelerated degradation tests. The technologies developed in this project are applied to the components of nuclear power plants. The applications include a localization of the NSSS integrity monitoring system, replacement of an in-service inspection by on-line monitoring, remote inspection of the major components of the plants, lifetime estimation of the degraded plant cables, and so on.

  6. 78 FR 53483 - Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 3

    Science.gov (United States)

    2013-08-29

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 052-00025; NRC-2008-0252] Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 3 AGENCY: Nuclear Regulatory Commission. ACTION: Determination of inspections, tests, analyses, and acceptance criteria (ITAAC) completion...

  7. 78 FR 53484 - Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 4

    Science.gov (United States)

    2013-08-29

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 052-00026; NRC-2008-0252] Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 4 AGENCY: Nuclear Regulatory Commission. ACTION: Determination of inspections, tests, analyses, and acceptance criteria (ITAAC) completion...

  8. New developments for optimization of automatic inspections in nuclear power plants

    International Nuclear Information System (INIS)

    Bollini, G.J.; Gonzalez, B.

    1989-01-01

    One of the most important factors to be taken into acount with respect to remote control mechanized inspection tasks carried out during refueling outages in nuclear power plants, which include components and systems as varied as the reactor vessel, nozzles, piping, vessel head closure bolts, turbine discs, etc., is the unification of systems used to control the inspection systems themselves. Likewise, the implementation in these systems of specific functions simplifying operational sequences and confirming correct execution of work implies a set of criteria that must be taken into account if the reliability of the tasks carried out is to be increased. The system presented in this paper, SIROCCO (Sistema Robotizado de Control) has been designed taking into consideration the above mentioned criteria, with two clear obectives in mind: a reduction in inspection times and in the dose received by the participating technical personnel, and an increase in the reliability of the electronic equipment used. In February and March of this year, during shutdown of a BMR-type nuclear power plant, several SIROCCO control units were usids in mechanized inspection systems of various kinds, applicable to components such as those mentioned above, with forecasts regarding the reduction of inspection times being met. The main reasons for this reduction were the familiarity of the operators with this single control system, the unification of replacement parts for equipment maintenance and the availability of interchangeable units. This philosophy of unification of electronic systems also includes data acquisition and the transmission of information between different areas, which require the unification of control systems already commented and accomplished. This course of action is currently under development at Tecnatom. (author). 4 figs

  9. 50 CFR 14.51 - Inspection of wildlife.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 1 2010-10-01 2010-10-01 false Inspection of wildlife. 14.51 Section 14.51 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE INTERIOR TAKING, POSSESSION, TRANSPORTATION, SALE, PURCHASE, BARTER, EXPORTATION, AND IMPORTATION OF WILDLIFE AND PLANTS...

  10. 78 FR 47272 - Monsanto Co.; Availability of Plant Pest Risk Assessment and Environmental Assessment for...

    Science.gov (United States)

    2013-08-05

    ..., DC, this 31st day of July 2013. Kevin Shea, Administrator, Animal and Plant Health Inspection Service... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service [Docket No. APHIS-2012-0020] Monsanto Co.; Availability of Plant Pest Risk Assessment and Environmental Assessment for Determination of...

  11. Chemical cleaning the service water system at a nuclear power plant

    International Nuclear Information System (INIS)

    Brice, T.O.; Glover, W.A.

    1994-01-01

    Chemical cleaning a large cooling water system in a nuclear power plant presented many unique problems. The selection, qualification, and performance of the cleaning process were done using a phased approach. The piping was inspected to determine the extent of the problem. Deposit samples were removed from the service water system pipe and tested in the laboratory to determine the most effective cleaning solvent for deposit removal. An engineering study was performed to define the design parameters required to implement the system-wide chemical cleaning

  12. Remote-automated inspection and maintenance of nuclear power plant equipment

    Energy Technology Data Exchange (ETDEWEB)

    Sasaki, Masayoshi; Nakano, Yoshiyuki

    1984-12-01

    Employing remote-control inspection and maintenance equipment in nuclear power plants increases the plant availability by decreasing the annual shutdown time (outage), as well as radiation exposure and man-power. This paper presents an outline of the latest designs for an automatic refueling machine, a control rod drive handling machine, a fuel preparation machine, and a main steam line plug, which were supplied to the Fukushima Dai-Ni No. 2 Plant of the Tokyo Electric Power Co., Inc. (Fukushima 2-2). Also, the up-to-date developments of other new automatic machines, such as a CRD disassembly and cleaning system, spent fuel channel box volume reduction equipment, and robotics for nuclear plant use are presented.

  13. 7 CFR 2.80 - Administrator, Animal and Plant Health Inspection Service.

    Science.gov (United States)

    2010-01-01

    ... Meat Inspection Act, as amended, as it pertains to the issuance of certificates of condition of live... U.S.C. 2131-2159). (7) Horse Protection Act (15 U.S.C. 1821-1831). (8) 28 Hour Law, as amended (49 U... following: (i) Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act, as...

  14. In service inspection and repair of sodium cooled ASTRID prototype

    Energy Technology Data Exchange (ETDEWEB)

    Baque, F.; Jadot, F. [French Atomic Commission, Cadarache Centre, 13108 Saint Paul lez Durance Cedex, (France); Marlier, R. [AREVA, 10 rue Recamier, 69456 Lyon cedex 06, (France); Saillant, J-F. [AREVA/NDE Solutions, 4 rue Thomas Dumorey, BP 70385, 71109 Chalon sur Saone Cedex, (France); Delalande, V. [EDF R and D, 6, quai Watier, 78400 Chatou, (France)

    2015-07-01

    In the frame of the large R and D work which is performed for the future ASTRID sodium cooled prototype, In Service Inspection and Repair (ISI and R) has been identified as a major issue to be taken into account in order to enlarge the plant safety, to consolidate its availability and to protect the associated investment. After the first part of pre-conceptual design phase (2008-2012), the running second part of pre-conceptual phase (2013-2015) allows to increase the ISI and R tool ability for immersed sodium structures of ASTRID, at about 200 deg. C, on the basis of consolidated specifications and thanks to their qualification through more and more realistic laboratory tests and simulation with CIVA code. ISI and R items are being developed and qualified during a pluri-annual program which mainly deals with the reactor block structures, the primary components and circuit, and the Power Conversion System. It ensures a strong connection between the reactor designers and inspection specialists, as the optimization of inspectability and repairability is looked at: this already induced specific rules for design, in order to shorten and ease the ISI and R operations, which have been merged into RCC-MRx rules. In the frame of increasing technology readiness level with corresponding performance demonstration, this paper presents R and D dealing with the ISI and R items: it highlights the sensor development (both ultrasonic and electromagnetic concepts, compatible with sodium at 200 deg. C), then their applications for ASTRID structure control (under sodium telemetry, imaging and NDE). Activity for repair is also presented (a single laser tool for sodium sweeping, machining and welding), and finally the effort for associated robotic (generic program for ASTRID applications, specific technological tools for sodium medium, tight immersed bell). The main results of testing and simulation are given for telemetry, vision, NDE applications, laser process repair and under sodium

  15. Role of in-service inspection and maintenance in reliability assurance of concrete structures in nuclear plants

    International Nuclear Information System (INIS)

    Ellingwood, B.R.; Mori, Y.

    1993-01-01

    The degradation in strength of a component with random damage is evaluated using a growth model for individual damages which can be obtained from experimental data. The distribution function of damage intensity after inspection and repair is updated using a Bayesian analysis that takes the quality of inspection into account. With this posterior distribution, the time-dependent strength after the inspection and repair can be evaluated. Time-dependent reliability analysis can be used to determine inspection/repair strategies that are necessary to keep the failure probability of the component lower than an established target. (author)

  16. NDT in inspection-repairing of boiler AE-101 of fertilizers Plant-Talara-Peru

    International Nuclear Information System (INIS)

    Torres, F.

    1988-01-01

    Experiences got from the use of NDT in inspection-repairing of boiler AE-101 of fertilizers Plant-Talara is presented after failures by pipes breakage. Applying liquid penetrant testing and visual inspection it was possible to determine the seriousness of the equipment the use of metallographic copies, ultrasonic measurements and hardness gave us an idea of the actual condition of the equipment, allowing a safe performance

  17. 15. Internal symposium on recent progress of nondestructive inspection and monitoring technologies for nuclear power plants

    International Nuclear Information System (INIS)

    1994-01-01

    At the symposium, lectures were given on the recent development of the nondestructive inspection technology for nuclear power plants, the trend regarding the nondestructive inspection in foreign countries (Japan-Germany atomic energy seminar), the present state and subjects of the monitoring technology in BWR plants, the present state and subjects of the monitoring technology in PWR plants, and the present state and the subjects for hereafter of the defect evaluation method in the equipment of light water reactors. The data on the ultrasonic flaw detection in aluminum alloy welded joints were obtained. The German inspection technology is similar to that in Japan and other countries. The research on the plant synthetic monitoring and diagnosis system is reported. The monitoring systems for abnormal state in operation, troubles and the secular change of equipment are reported. The evaluation of the flaws in nuclear piping is reported. The summaries of the lectures are collected in this book. (K.I.)

  18. The influence of frequency and reliability of in-service inspection on reactor pressure vessel disruptive failure probability

    International Nuclear Information System (INIS)

    Jordan, G.M.

    1978-01-01

    A simple probabilistic methodology is used to investigate the benefit, in terms of reduction of disruptive failure probability, which comes from the application of periodic in-service inspection to nuclear pressure vessels. The analysis indicates the strong interaction between inspection benefit and the intrinsic quality of the structure. In order to quantify the inspection benefit, assumptions are made which allow the quality to be characterised in terms of the parameters governing a log normal distribution of time - to - failure. Using these assumptions, it is shown that the overall benefit of in-service inspection unlikely to exceed an order of magnitude in terms of reduction of disruptive failure probability. The method is extended to evaluate the effect of the periodicity and reliability of the inspection process itself. (author)

  19. In-service inspection for nuclear power plants

    International Nuclear Information System (INIS)

    1980-01-01

    The Safety Guides are recommendations issued by the Agency for use by Member States in the context of their own nuclear safety requirements. Design consideration, in-service examination, test requirements, repair and replacement, equipment, methods and techniques and also administrative aspects are given in this issue

  20. 76 FR 7807 - National Wildlife Services Advisory Committee; Notice of Solicitation for Membership

    Science.gov (United States)

    2011-02-11

    ... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service [Docket No. APHIS-2010-0060... Plant Health Inspection Service, USDA. ACTION: Notice of solicitation for membership. SUMMARY: We are... minorities, women, and persons with disabilities. Done in Washington, DC this 7th day of February 2011. Kevin...

  1. Optimisation of maintenance and inspection work in nuclear power plants

    International Nuclear Information System (INIS)

    Meyer, V.

    1996-01-01

    The long-term planning and comparative evaluation of inspection and maintenance intervals as well as results of electric components and machinery have to be intensified in order to shorten maintenance shut-down periods, e.g. of the Grohnde reactor station, thus improving the availability of the plant and the specific electricity generation cost. Economically efficient maintenance has to be based on an efficient organisational structure. Outsourcing of less plant-specific work and tasks offers the possibility for in-house personnel to concentrate on their core competences. All the measures discussed contribute to improving the economic efficiency of the nuclear power plants. (orig./DG) [de

  2. 50 CFR 260.97 - Conditions for providing fishery products inspection service at official establishments.

    Science.gov (United States)

    2010-10-01

    ... processed foods and/or components thereof; (10) Furnish and provide laundry service, as required by NMFS... inspection service at official establishments. 260.97 Section 260.97 Wildlife and Fisheries NATIONAL MARINE FISHERIES SERVICE, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE PROCESSED FISHERY...

  3. Mobile robot teleoperation system for plant inspection based on collecting and utilizing environment data

    International Nuclear Information System (INIS)

    Kawabata, Kuniaki; Watanabe, Nobuyasu; Asama, Hajime; Kita, Nobuyuki; Yang, Hai-quan

    2004-01-01

    This paper describes about development of a mobile robot teleoperation system for plant inspection. In our system, the robot is an agent for collecting the environment data and is also teleoperated by the operator utilizing such accumulated environment data which is displayed on the operation interface. The robot equips many sensors for detecting the state of the robot and the environment. Such redundant sensory system can be also utilized to collect the working environment data on-site while the robot is patrolling. Here, proposed system introduces the framework of collecting and utilizing environment data for adaptive plant inspection using the teleoperated robot. A view simulator is primarily aiming to facilitate evaluation of the visual sensors and algorithms and is also extended as the Environment Server, which is the core technology of the digital maintenance field for the plant inspection. In order to construct detailed seamless digital maintenance field mobile robotic technology is utilized to supply environment data to the server. The sensory system on the robot collect the environment data on-site and such collected data is uploaded to the Environment Server for compiling accurate digital environment data base. The robot operator also can utilize accumulated environment data by referring to the Environment Server. In this paper, we explain the concept of our teleoperation system based on collecting and utilizing environment data. Using developed system, inspection patrol experiments were attempted in the plant mock-up. Experimental results are shown by using an omnidirectional mobile robot with sensory system and the Environment Server. (author)

  4. Inservice inspection of heavy water plants - a tool in assessing damage to components and life extension

    International Nuclear Information System (INIS)

    Subramanian, C.V.; Thavasimuthu, M.; Bhattacharys, D.K.; Baldev Raj

    1994-01-01

    Any system and its components are expected to give trouble free service over a certain period of time known as life time. The life time is estimated during the design stage. To achieve the design life, certain level of quality are to be defined and this quality has to be worked into the components by proper fabrication processes and their compliance with quality are to be checked. In addition, one has to guard against initiation or propagation of defects which may occur due to normal and abnormal service conditions. Non-destructive test (NDT) techniques are widely used for finding the health of the component. The role of NDT extends from the production stage to the entire life period of the system. This paper highlights the periodic in-service inspection (ISI) carried out on various components of the Heavy Water Plants (HWP) in India in assessing the integrity of the components and predicting the life of the components. (author). 3 refs., 4 figs

  5. Labour inspection in nuclear power plant

    International Nuclear Information System (INIS)

    Vallet, J.; Polge, Ch.

    2009-01-01

    The French nuclear safety authority is in charge of labour inspection in nuclear power plants due to historical reasons. Thus, fifteen agents of ASN are acting simultaneously as nuclear inspectors and labour inspectors: they fulfill in the fifty eight reactor operated by EDF. ASN labour inspectors have the same rights ant duties than labour inspectors who fulfill in other French administrations. The regulatory domain is exactly the same. The work of ASN labour inspectors is divided in two main parts checking, on the one hand health and safety regulation requirements and on the other hand, social laws requirements. ASN labour inspectors assume, on their own, most of the decision they have to bring out. Nevertheless, ASN labour inspectors meet each other four times a year in order to share experiences. ASN labour inspectors and nuclear safety inspectors work together in the nuclear power plant. Its the principal benefit of this organisation. A high nu-clear safety level can not be reach without a good work conditions and social dialogue with labour unions. (author)

  6. Recent experience in nuclear plant nondestructive examinations

    International Nuclear Information System (INIS)

    Epps, T.N.

    1986-01-01

    This paper reviews recent experience in nuclear plant inservice inspection activities including ultrasonic examination of piping materials, personnel qualification, results, and the overall significance to the industry. Several areas of concern to the nuclear power industry have recently been addressed by Southern Company Services' (SCS) Inspection, Testing, and Engineering Department during implementation of preservice and in-service inspection activities in the SCS system. The most significant of these activities is the ultrasonic inspection of Type 304 stainless steel piping for the presence of intergranular stress corrosion cracking (IGSCC). This activity has been in the forefront of boiling water reactor (BWR) in-service inspections for the past several years

  7. Optimized inspection techniques and structural analysis in lifetime management

    International Nuclear Information System (INIS)

    Aguado, M.T.; Marcelles, I.

    1993-01-01

    Preservation of the option of extending the service lifetime of a nuclear power plant beyond its normal design lifetime requires correct remaining lifetime management from the very beginning of plant operation. The methodology used in plant remaining lifetime management is essentially based on the use of standard inspections, surveillance and monitoring programs and calculations, such as thermal-stress and fracture mechanics analysis. The inspection techniques should be continuously optimized, in order to be able to detect and dimension existing defects with the highest possible degree of accuracy. The information obtained during the inspection is combined with the historical data of the components: design, quality, operation, maintenance, and transients, and with the results of destructive testing, fracture mechanics and thermal fatigue analysis. These data are used to estimate the remaining lifetime of nuclear power plant components, systems and structures with the highest degree possible of accuracy. The use of this methodology allows component repairs and replacements to be reduced or avoided and increases the safety levels and availability of the nuclear power plant. Use of this strategy avoids the need for heavy investments at the end of the licensing period

  8. Application of risk-informed in-service inspection approach. Pilot study on low pressure emergency core cooling system of NPP Temelin

    International Nuclear Information System (INIS)

    Horacek, L.; Palyza, J.; Zdarek, J.; Vizina, M.

    2004-01-01

    In-service inspection (ISI) programme of piping systems based on Riskinformed In-service Inspections (RI-ISI) approach represents for the WWER NPP licensee first overall systematic conceptual solution of the problems associated with design and design modifications of ISI programme for piping systems. The approach enables to consider possible savings and comparison of in-service inspection programmes according to more objective criteria including those calculated in PSA, in contrast to present much empiric experience collected by manufacturers, operators and ISI vendors in the past. Service experience has shown limited correlation between the deterministic ISI requirements and actual field failures or degradation mechanisms. Where field failures have been observed in piping, they have generally been due to either material concerns (e.g., Intergranular Stress Corrosion Cracking) or stress/cycling mechanisms not identified in the original design basis documents (e.g., thermal stratification), and therefore would not be selected for inspection under current requirements. Risk-informed in-service inspections represent integrated multidisciplinary approach to the in-service inspection programme fulfilling the enhanced requirements of the Czech Regulatory Body (SUJB) for defence in depth concept applied to weld joints of safety related components, application of qualified NDT methods/techniques and introducing of inspections for cause approach. Inspections for cause take into account analysis of both active and potential degradation mechanisms specific to piping system concerned. Simultaneously, this approach enables the licensee to reach, in cases justified from safety point of view, economic savings resulting from lowering of both number and extent of performed in-service inspections and optimisation of their performance. RI ISI pilot study based in majority on EPRI methodology implemented for WWER type reactors has been performed for LP ECCS (Low Pressure Emergency

  9. IAEA-RCA training course on in-service inspection of research reactors

    International Nuclear Information System (INIS)

    2002-01-01

    Bhabha Atomic Research Centre (BARC) has acquired a wide range of experience for over four decades in design, construction, operation and maintenance of research reactors. The two-week training course on In-Service Inspection of Research Reactors (ISI) has greatly increased the awareness in the field of ISI of Research Reactors. The training course has been formulated so as to cover most of the topics relevant to ISI of research reactors. Important topics such as rationale for in-service inspection, material degradation mechanisms, non-destructive examination techniques, design evaluation of flaws and radiological, codal and regulatory aspects of ISI for research reactors were covered. Lectures on ISI of elastomeric materials and concrete structures, which are generally used in the construction of reactors have also been included in the course. Papers relevant to INIS are indexed separately

  10. ASME section XI: rules for inservice inspection of nuclear power plants -an introspection

    Energy Technology Data Exchange (ETDEWEB)

    John, P K; Anto, Y; Mungikar, C P; Wagh, P M [Nuclear Power Corporation of India Ltd., Tarapur (India). Tarapur Atomic Power Station

    1994-12-31

    Section XI of the ASME BPV code is addressed to the examination, test and inspection requirements of the components of nuclear power plants (NPPs). Since its inception in 1970, this code section has undergone vast changes -probably the most among other ASME BPV code sections. Section XI is full fledged and lays down requirements with regard to all preservice inspections, inservice inspection, repair and replacement of components, tests of system etc. Tarapur Atomic Power Station (TAPS) has the distinction of being one of the earliest BWR type NPPs in the world that has an inservice inspection programme organised in line with the ASME section XI requirements. This paper summarises the experiences gained from time to time using this code section and a few suggestions to prospective users. An effort is also made to explain the philosophy of inservice inspection from ASME section XI point of view. 3 refs.

  11. ASME section XI: rules for inservice inspection of nuclear power plants -an introspection

    International Nuclear Information System (INIS)

    John, P.K.; Anto, Y.; Mungikar, C.P.; Wagh, P.M.

    1994-01-01

    Section XI of the ASME BPV code is addressed to the examination, test and inspection requirements of the components of nuclear power plants (NPPs). Since its inception in 1970, this code section has undergone vast changes -probably the most among other ASME BPV code sections. Section XI is full fledged and lays down requirements with regard to all preservice inspections, inservice inspection, repair and replacement of components, tests of system etc. Tarapur Atomic Power Station (TAPS) has the distinction of being one of the earliest BWR type NPPs in the world that has an inservice inspection programme organised in line with the ASME section XI requirements. This paper summarises the experiences gained from time to time using this code section and a few suggestions to prospective users. An effort is also made to explain the philosophy of inservice inspection from ASME section XI point of view. 3 refs

  12. 78 FR 36506 - Notice of Request for Extension of Approval of an Information Collection; Importation of Plants...

    Science.gov (United States)

    2013-06-18

    ... 2013. Kevin Shea, Acting Administrator, Animal and Plant Health Inspection Service. [FR Doc. 2013-14466... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service [Docket No. APHIS-2013-0035] Notice of Request for Extension of Approval of an Information Collection; Importation of Plants for...

  13. Overview of Activities in U.S. Related to Continued Service of Nuclear Power Plant Concrete Structures

    International Nuclear Information System (INIS)

    Naus, Dan J.

    2011-01-01

    Safety-related nuclear power plant concrete structures are described and commentary on continued service assessments of these structures is provided. In-service inspection and testing requirements in the U.S. are summarized. The license renewal process in the U.S. is outlined and its current status noted. A summary of operating experience related to U.S. nuclear power plant concrete structures is presented. Several candidate areas are identified where additional research would be of benefit to aging management of NPP concrete structures. Finally current ORNL activities related to aging-management of concrete structures are outlined: development of operating experience database, application of structural reliability theory, and compilation of elevated temperature concrete material property data and information.

  14. Experience of in-cell visual inspection using CCD camera in hot cell of Reprocessing Plant

    International Nuclear Information System (INIS)

    Reddy, Padi Srinivas; Amudhu Ramesh Kumar, R.; Geo Mathews, M.; Ravisankar, A.

    2013-01-01

    This paper describes the selection, customization and operating experience of the visual inspection system for the hot cell of a Reprocessing Plant. For process equipment such as fuel chopping machine, dissolver, centrifuge, centrifugal extractors etc., viewing of operations and maintenance using manipulators is required. For this, the service of in-cell camera is essential. The ambience of the hot cell of Compact facility for Reprocessing of Advanced fuels in Lead cell (CORAL) for the reprocessing of fast reactor spent fuel has high gamma radiation and acidic vapors. Black and white Charge Coupled Device (CCD) camera has been used in CORAL incorporating in-house modifications to suit the operating ambient conditions, thereby extending the operating life of the camera. (author)

  15. Risk informed approach to the in-service inspection activities

    International Nuclear Information System (INIS)

    Korosec, D.; Vojvodic Tuma, J.

    2004-01-01

    In the present paper, the aspects of Risk Informed In-Service Inspection (RI-ISI) are discussed. Slovenian Nuclear Safety Administration (SNSA) and its authorized organization for the ISI activities, Institute of Metals and Technologies (IMT), are actually permanently involved in the ISI processes of the nuclear power plant (NPP) Krsko. Based on the previous experience on the ISI activities, evaluation of the results and review of the existing practice in nuclear world, the activities are started to asses the piping of systems in the light of probability of failure. This is so called Risk Informed approach. By the design established criteria, standards and practice gives good fundaments for the improvements implementation. Improvements can be done on the way that the more broad knowledge about safety important components of the systems shall bee added to the basic practice. It is necessary to identify conditions of the safety important components, such as realistic stress and fatigue conditions, material properties changes due aging processes, the temperature cycling effects, existing flaws characterization in the light of the previous detection and equipment technique used, assessment of the measurement accuracy on the results etc. In addition to this deterministic approach, the principles of risk evaluation methods should be used. NPP Krsko has, as practically majority of NPP's, probabilistic risk assessment (PRA) studies for all safety important systems and components. The methods and results from these studies can be efficiently used to upgrade classical deterministic results, based on which the in-service program as a whole is usually done. In addition to the above mentioned, risk assessment and evaluation of the piping shall be done, which is not covered by the existing PRA analysis. To do this it is necessary to made risk evaluation of the piping segments, based on previous structural element probability assessment. Probabilistic risk assessment is important

  16. Inspection and enforcement by the regulatory body for nuclear power plants. A safety guide. A publication within the NUSS programme

    International Nuclear Information System (INIS)

    1996-01-01

    The purpose of this Safety Guide is to provide guidance on fulfilling the requirements for inspection and enforcement by the regulatory body, as set out in the Code on the Safety of Nuclear Power Plants; Governmental Organization. This Safety Guide deals with the responsibilities of the regulatory body, the organization of inspection programmes, the inspection resources of the regulatory body, methods of inspection, requirements on the applicant/licensee in regard to regulatory inspection, inspection reports, and regulatory action and enforcement. It is recognized that many of the provisions of this Safety Guide may be applicable to the regulations of other nuclear facilities and related activities including research reactors, fuel processing and manufacturing plants, irradiated fuel processing plants and radioactive waste management facilities. This Safety Guide does not deal specifically with the functions of a regulatory body responsible for such matters; however, the guidance presented here may be applied as appropriate to these activities. 11 refs, 1 fig

  17. Wastewater treatment plant inspection program, fiscal year 2006 and 2007 data report

    OpenAIRE

    Greco, Stacie

    2008-01-01

    This data report includes the results from Alachua County Environmental Protection Department’s inspections of wastewater treatment plants (WWTP) within Alachua County during the 2006 and 2007 fiscal years (October 2005 – September 2007). Groundwater monitoring data provided to the Florida Department of Environmental Protection Department by the WWTP operators is included for those treatment plants that are required to submit this information (PDF has 44 pages.)

  18. Auxiliary feedwater system risk-based inspection guide for the Beaver Valley, Units 1 and 2 nuclear power plants

    International Nuclear Information System (INIS)

    Lloyd, R.C.; Vehec, T.A.; Moffitt, N.E.; Gore, B.F.; Vo, T.V.; Rossbach, L.W.; Sena, P.P. III

    1993-02-01

    In a study sponsored by the US Nuclear Regulatory Commission (NRC), Pacific Northwest Laboratory has developed and applied a methodology for deriving plant-specific risk-based inspection guidance for the auxiliary feedwater (AFW) system at pressurized water reactors that have not undergone probabilistic risk assessment (PRA). This methodology uses existing PRA results and plant operating experience information. Existing PRA-based inspection guidance information recently developed for the NRC for various plants was used to identify generic component failure modes. This information was then combined with plant-specific and industry-wide component information and failure data to identify failure modes and failure mechanisms for the AFW system at the selected plants. Beaver Valley Units 1 and 2 were selected as two of a series of plants for study. The product of this effort is a prioritized listing of AFW failures which have occurred at the plant and at other PWRs. This listing is intended for use by NRC inspectors in the preparation of inspection plans addressing AFW risk-important components at Beaver Valley Units 1 and 2

  19. Status of ASME risk-based inspection guidelines development for nuclear power plants

    International Nuclear Information System (INIS)

    Gore, B.F.; Vo, T.V.; Balkey, K.R.

    1991-01-01

    The general methodology published by the task force is being applied to develop guidelines for the inspection of nuclear power plant components. The methodology has been expanded to include the use of information from probabilistic risk assessments to improve the quantification of risks associated with component ruptures. In addition, a procedure has been recommended for using these quantified risk estimates to determine target component rupture probability values to be maintained by inspection activities. Finally, the method for determining the characteristics which an inspection strategy must possess in order to maintain these target rupture probabilities has been described. This paper presents the major features of this methodology, along with a discussion of the status of efforts to develop and to apply it further

  20. Military Food Inspection: Its History and Its Effect on Readiness

    Science.gov (United States)

    1991-03-15

    inspections. Establishments include commercial food plants such as animal slaughter houses, milk plants, bakeries , ice cream plants, and warehouses...establishments had never been checked for sanitation. Local bakeries had no concept of sanitation. The fresh fruits and vegetables being purchased from the Saigon... franchise in Vietnam. The approved ice needed to be identified by some means. The veterinary service planned to identify it by adding an approved Food

  1. Aging and service wear of air compressors and dryers in nuclear power plants

    International Nuclear Information System (INIS)

    Moyers, J.C.

    1989-01-01

    Compressed air systems and their associated compressors and dryers as incorporated in LWR power plants usually are not classified as safety related systems and components because their continued operation is not required to bring the plant to a safe shutdown condition. However, control air is a vital requirement for maintaining stable plant operation and its loss often results in a reactor trip and, on occasion, the actuation of engineered safety feature systems. Concerns caused by repeated instances of failures in air systems resulted in the high-priority ranking of Generic Issue No. 43, ''Reliability of Air Systems'' by the NRC. In support of the Nuclear Plant Aging Research (NPAR) Program, the Oak Ridge National Laboratory is carrying out a Phase I aging assessment of air compressors and dryers used in LWR power plants. The objectives of this study include: (1) determination of the types and ratings of equipment utilized in typical plants; (2) identification of aging and service wear stressors imposed on the machines; (3) evaluation of operating experience with the machines; (4) comparison of user and manufacturer-recommended inspection, surveillance, and monitoring (ISM) methods; and (5) the identification of any improved ISM methods that might lead to longer, more reliable, service. 2 refs

  2. Evaluation of nuclear power plant concrete to maintain continued service

    International Nuclear Information System (INIS)

    McColm, E.J.; Mukherjee, P.K.; Sato, J.A.

    1997-01-01

    Nuclear power plant concrete structures in addition to satisfying structural requirements are a major part of the safety and containment systems. As a result, the structures are required to operate satisfactorily for the life of the plant and until well after decommissioning. Successful life management requires an understanding of potential degradation mechanisms that can impact on the performance of these structures, regular well planned inspection programs and the use of specialized repair and maintenance programs. These aspects of nuclear life management are discussed with an example of inspection and repair conducted at one of Ontario Hydro's nuclear generating stations. The example is discussed in terms of the performance requirements of the containment concrete. The plant referred to has been in operation for over 20 years, making it currently the oldest operating commercial nuclear power plant in Ontario, Canada. The information on the concrete containment structures included baseline construction data on the concrete material properties and the results of periodic scheduled and other interim specialized inspections. Also available were the results of laboratory testing of concrete cores obtained from the structures. The data from these inspections and laboratory testing were used to monitor the aging characteristics of the structures and to plan appropriate repair activities. (author)

  3. Experience with the implementation of a risk-based ISI program and inspection qualification

    International Nuclear Information System (INIS)

    Chapman, O.J.V.

    1996-01-01

    Rolls Royce and Associates (RRA) are the Design Authority (DA) for Nuclear Steam Raising Plant (NSRP) used for the Royal Naval Nuclear Fleet. Over the past seven years RRA, with support from the Ministry of Defense, has developed and implemented a risk based in-service inspection (RBISI) strategy for the NSRP. Having used risk as a means of optimizing where to inspect, an inspection qualification (IQ) process has now been put in place to ensure that proposed inspections deliver the expected gains assumed. This qualification process follows very closely that currently being put forward by the European Network on Inspection Qualification (ENIQ)

  4. 7. ordinance to amend the ordinance concerning fees for inspection of plants and systems subject to surveyance

    International Nuclear Information System (INIS)

    1983-01-01

    The fees to be levied for inspection largely remained the same since April 1, 1977 for the majority of industrial plants. The seventh amendment is intended to bring about an adjustment of fees to current costs of inspection. Considering the differing increase in fees for the various types of plants, an average increase of 7% is to be expected according to the draft ordinance. The additional expense to be borne by the operators of industrial plants subject to surveyance are low: an effect on consumer prices hence is not to be expected. (orig.) [de

  5. 78 FR 63518 - Uranium Enrichment Fuel Cycle Inspection Reports Regarding Louisiana Energy Services, National...

    Science.gov (United States)

    2013-10-24

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 70-3103; NRC-2010-0264] Uranium Enrichment Fuel Cycle Inspection Reports Regarding Louisiana Energy Services, National Enrichment Facility, Eunice, New Mexico... Louisiana Energy Services (LES), LLC, National Enrichment Facility in Eunice, New Mexico, and has authorized...

  6. Experience on implementing risk-oriented in-service inspection at NPP in USA

    International Nuclear Information System (INIS)

    Grebenyuk, Yu.P.; Zaritskij, N.S.; Kovyrshin, V.G.; Kostenko, S.P.

    2001-01-01

    Experience of implementing risk-oriented in-service inspection (RIISI) of pipelines at the US NPP analyzed. RIISI processes according to the methodologies developed by Westinghouse and EPRI are described and compared. The information is addressed concerning practical matters of RIISI implementing at NPP Beaver Valley and Arkansas Nuclear One. Regulatory activity of the US NRC while implementing NRC at the US NPP. It is shown that using RIISI at NPP is aimed at improvement of examination efficiency, decreasing costs and occupational dose loads while inspecting pipelines

  7. Activities at ORNL in support of continuing the service of nuclear power plant concrete structures

    International Nuclear Information System (INIS)

    Naus, D.J.

    2012-01-01

    In general, nuclear power plant concrete structure's performance has been very good; however, aging of concrete structures occurs with the passage of time that can potentially result in degradation if its effects are not controlled. Safety-related nuclear power plant concrete structures are described. In-service inspection and testing requirements in the U.S. are summarized. The interaction of the license renewal process and concrete structures is noted. A summary of operating experience related to aging of nuclear power plant concrete structures is provided. Several candidate areas are identified where additional research would be beneficial for aging management of nuclear power plant concrete structures. Finally, an update on recent activities at Oak Ridge National Laboratory related to aging management of nuclear power plant concrete structures is provided. (author)

  8. Inspection accessibility study of the Millstones Unit 1 Reactor Pressure Vessel

    International Nuclear Information System (INIS)

    Calhoun, G.; Kapoor, A.; Davis, J.B.

    1990-07-01

    The need for more extensive ultrasonic examination of the Reactor Pressure Vessel (RPV) shell welds at some of the BWR plants is becoming apparent. Recent NRC comments regarding limits on future inspection relief requests and proposed revisions to the ASME Boiler and Pressure Vessel Code, Section 11 have caused BWR plant owners and vendors of inspection services to look at inspection tooling that would allow for the ultrasonic examination of RPV shell welds previously considered inaccessible. One approach to inspection of the RPV shell welds that will allow for greater coverage at some BWR plants is to perform these inspections from inside the vessel. In late 1988, Westinghouse received a contract from Northeast Utilities to examine the flange ligament areas and the shell welds in the upper portion of the Millstone Unit 1 PRV during an outage scheduled to begin in April 1989. This examination was performed with an inspection tool placed inside of the vessel and the UDRPS data acquisition system. The inspection tool was based on tooling used routinely at the Swedish and Finnish BWRs. The object of RP C105-1 was to use the information gathered prior to and during the Millstone Unit 1 examination and to perform an inspection accessibility study and prepare a report covering the lessons learned during the examination that would benefit other BWR utilities considering similar inspections. The final report consists of two volumes. This document, Volume 1, describes a 3D model of the Millstone Unit 1 PRV that was based on information obtained from plant drawings. The model is a useful tool for visualizing areas of limited access from both inside and outside of the RPV. 5 refs., 38 figs., 4 tabs

  9. Optimising import phytosanitary inspection

    NARCIS (Netherlands)

    Surkov, I.

    2007-01-01

    Keywords: quarantine pest, plant health policy, optimization, import phytosanitary inspection, ‘reduced checks’, optimal allocation of resources, multinomial logistic regression, the Netherlands World trade is a major vector of spread of quarantine plant pests. Border phytosanitary inspection

  10. Remote-automation of nuclear power plant equipment inspection and maintenance

    International Nuclear Information System (INIS)

    Sasaki, Masayoshi; Kawamura, Hironobu; Nakano, Yoshiyuki; Izumi, Shigeru.

    1984-01-01

    The remotely operated automation of the checkup and maintenance of nuclear power generation facilities has largely contributed to the rise of capacity ratio of plants due to the shortening of regular inspection period and to the reduction of radiation exposure dose during working, the labor saving in working and so on. In this paper, the new technologies adopted in an automatic fuel exchanger, a remotely operated automatic CRD exchanger, a new type channel handling machine, pressure-withstanding main steam line plugs and so on for No.2 plant in the Fukushima No.2 Nuclear Power Station, Tokyo Electric Power Co., Inc., are reported. Besides, the state of development of new remotely operated automatic machines for nuclear power use, such as CRD disassembling and cleaning device, volume reduction equipment for spent fuel channel boxes and control rods, multi-functional robots for use under high radiation and so on is described. Also the trend of development of latest robot technology which will be put in practical use in near future is outlined, such as a running manipulator for checkup and inspection, a variable form crawler vehicle and a five-leg movable manipulator. (Kako, I.)

  11. Quality control and in-service inspection technology for hybrid-composite girder bridges.

    Science.gov (United States)

    2014-08-01

    This report describes efforts to develop quality control tools and in-service inspection technologies for the fabrication and construction of Hybrid Composite Beams (HCBs). HCBs are a new bridge technology currently being evaluated by the Missouri De...

  12. Improvement of testing techniques for inspecting steam turbine rotor in power plant

    International Nuclear Information System (INIS)

    Su, Yeong Shuenn; Wei, Chieng Neng; Wu, Chien Wen; Wu, Yung How

    1997-01-01

    Steam turbine rotor is important to the Utility industry, it degrades over time due to fatigue and corrosion under high temperature and high pressure environment. Periodic inspection is required in the wake of plant annual overhaul to ensure the integrity of turbine rotor. Non-Destructive Testing of turbine rotor is usually performed using magnetic particle testing with wet fluorescent magnetic particle. However, it is very difficult to ensure the reliability of inspection due to the limitation of using one NDT method only. The crack-susceptible areas, such as turbine blade, and blade root have high incidence of stress corrosion cracking, The blade root section is difficult to locate cracks because of the complex geometry which may cause inadequate magnetic field and poor accessibility. Improved inspection practices was developed by our Department, together with remaining life analysis, in maintaining the high availability of steam turbine rotor. The newly-developed inspection system based on the practical study of magnetic field strength distribution, quality of magnetic particle bath and a combination of different NDT methods with Eddy Current Testing using absolute pen-type coil and Visual Testing using reflective mirror to examine the key areas concerned are described. TPC' experience with the well-trained technicians together with the adequate inspection procedure in detecting blade-root flaws are also discussed in the paper. Many of these inspection improvement have been applied in the fields for several times and the inspection reliability has been enhanced substantially. Results are quite encouraging and satisfactory.

  13. Ferromagnetic material inspection for feedwater heater and condenser tubes

    International Nuclear Information System (INIS)

    Anon.

    1987-01-01

    In recent years, special ferritic stainless steels, such as AL29-4C/sup TM/, Sea-Cure/sup TM/, E-Brite/sup TM/, 439, and similar alloys have been introduced as tube material in condensers, feedwater heaters, moisture separator/reheaters, and other heat exchangers. In addition, carbon steel tubes are widely used in feedwater heaters and heat exchangers in chemical plants. The main problem with the in-service inspection of these ferritic alloys and carbon steel tubes lies in their highly ferromagnetic properties. These properties severely limit the application of the standard eddy current techniques. The effort was undertaken under EPRI sponsorship to develop a reliable technique for in-service inspection of ferromagnetic tubes. The new method combines the measurement of magnetic flux leakage generated around the defects with measurement of total flux in the tube wall. The heart of the inspection system is a special ID probe that magnetizes the tube and generates signals for any tube defect. A permanent record of inspection is provided with a strip-chart or magnetic tape recorder. The laboratory and field evaluation of this new system demonstrated its very good sensitivity to small defects, its reliability, and its ruggedness. Defects as small as 10% external wall loss in heavy wall carbon steel tube were detected. Tubes in the power plant were inspected at a rate of 300-500 tubes per eight-hour shift. The other advantages of this newly developed technique are its simplicity, low cost of instrumentation, easy data interpretation, and full portability

  14. Survey on maintenance skills required for nuclear power plant periodic inspections

    International Nuclear Information System (INIS)

    Hamasaki, Kenichi

    2008-01-01

    In this study, we conducted a trend survey regarding the problem of passing on senior workers' skills and knowledge to young employees in industries in general, and an interview survey of skilled workers engaged in maintenance work during periodic inspections at a nuclear power plant. These surveys aimed to obtain useful information for maintaining and improving the quality of future maintenance work during nuclear power plant periodic inspections. The trend survey of industries found that the 'Year 2007 Problem (difficulties associated with the start of mass retirements of baby-boomers)' was often takenup in various fields and that many companies were concerned about losing their accumulated skills and know-how. To ensure that skills are smoothly passed on to the younger generation, companies have taken various measures, such as development of plans for passing on skills and knowledge, introduction of the Meister system and implementation of workshops by skilled workers. The interview survey of skilled workers engaged in maintenance work of mechanical equipment during periodic inspections at Nuclear Power Plant A found that various skills were required in maintenance work. Regarding perceived differences between skilled and unskilled maintenance workers, many respondents believed that the largest difference was in terms of time taken to carry out specific procedures. Some maintenance companies have increasingly fewer skilled workers than before or face aging of skilled personnel. As future concerns, respondents cited the loss of skills that have been acquired through experience in construction and in handling of troubles and failures. Differences were observed among companies in the degree to which skills have been passed on to the younger generation. As a reason why skills are not successfully passed on, respondents cited communication problems due to age differences between senior and young workers and other problems that were also observed in other industries

  15. The Development of a Snubber Management System for Welds in Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Yoo, Hyun Ju; Cho, Yong-Bae; Kim, Yoo Sung [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    There are snubbers, spring hanger, anchors, rigid supports for the structures which support the static and/or dynamic loads such as thermal load, pressure, impact and vibration from components and pipings of nuclear power plants. Snubbers constrain the displacements generated by loads transmitted to components and systems abruptly. When the loss of function of snubber during normal operation, the thermal load and pressure transmit directly to structures such as pipings and components, and additional loads, which were not considered during the design stage, act on the structures. Therefore, according to regulatory requirement to confirm the stability of supporting system, the inspection for the snubber is reflected to in-service inspection (ISI) and in-service test (IST) plans. In order to comply with the regulatory requirement, KHNP has performed the ISI and IST and inspected the snubbers. As the increment of operating year of nuclear power plants in Korea, the possibility of deterioration of equipment is higher. Therefore, the security related to the integrity of equipment becomes more important. The snubber takes an important role related to the structural integrity equipped on principal pipings. 100% snubbers are inspected during pre-service inspection and 10% snubbers are inspected during in-service inspection as a sample in nuclear power plants in Korea. KHNP has been developed a snubber management system because there was no management tool for snubbers to show the inspection and maintenance results systematically. The inspection and maintenance results of snubbers can be easily reached by plants, head office and CRI. Moreover, the information related to inspection history and condition of snubber can be effectively inquired.

  16. Aspects of the Optimization on the In-Service Inspection

    International Nuclear Information System (INIS)

    Korosec, D.; Vojvodic Tuma, J.

    2002-01-01

    In the present paper, the aspects of optimizing In-Service Inspection (ISI) is discussed. Slovenian Nuclear Safety Administration (SNSA) and its authorized organization for the ISI activities, Institute of Metals and Technologies, are actually permanently involved in the ISI processes of the nuclear power plant (NPP) Krsko. Based on the previous experience on the ISI activities, evaluation of the results and review of the new ISI program, the decision was made to improve recent regulatory and professional practice. That means, the conclusion was made to optimize the evaluation process of the ISI as a process. Traditional criteria, standards and practice gives good fundament for the improvements implementation. Improvements can be done on the way that the more broad knowledge about safety important components of the systems shall bee added to the basic practice. It is necessary to identify conditions of the safety important components, such as realistic stress and fatigue conditions, material properties changes due aging processes, the temperature cycling effects, existing flaws characterization in the light of the previous detection and equipment technique used, assessment of the measurement accuracy on the results etc. In addition to the above mentioned, risk assessment and evaluation of the whole ISI shall be done. To do this it is necessary to made risk evaluation, based on previous structural element probability assessment. Probabilistic risk assessment is important and one of the most powerful tools in the ISI optimization. Some basic work on the filed of the risk informed methods related to the nuclear safety components has been already done. Based on reference documentation, the most important steps in risk informed ISI are discussed: scope definition, consequence evaluation, failure probability estimation, risk evaluation, non-destructive examination method selection and possibilities of implementation, monitoring and feedback. Recent experience on the ISI

  17. Implementation of in-service inspection program for HANARO

    International Nuclear Information System (INIS)

    Wu, J.S.; Park, Y.C.; Cho, Y.G.; Jun, B.J.

    2001-01-01

    HANARO, a 30 MW multi-purpose research reactor in Korea has been successfully in operation for 6 years since its initial criticality in February 1995. It is mainly used for the research areas including nuclear fuel and material irradiation tests, radioisotope production, neutron beam application, neutron activation analysis and neutron transmutation doping. HANARO was designed to perform for at least 20 years under full power operating condition. It is expected that the actual reactor lifetime will be much more than the design lifetime, due to a safety reassessment based on realistic data, preventive maintenance and appropriate in-service inspections (ISI). Since ageing may affect the overall safety of the reactor facility, it is needed to detect and evaluate the effects on aged components and systems related to safety. During the lifetime of the reactor, structures, systems and components are subjected to environmental conditions of stress, temperature and irradiation that may lead to changes in the material properties and could result in unexpected failures. Evidence of ageing problems appears progressively. A rigorous inspection and visual examination based on a periodic ISI program should be established. It is desirable that the ageing surveillance activities is scheduled as early as possible and continued throughout the operating life of the reactor. An inspection plan for safety related structures, systems and components subjected to the ageing conditions is requested by the regulatory body to assess the safety status of reactor facility. A long-term ISI program for HANARO has been established for safety-related systems and components in the context of the overall reactor ageing management. The objective of this paper is to describe the ISI program and the result of the visual inspection as the first ISI. (orig.)

  18. Program for establishing long-time flight service performance of composite materials in the center wing structure of C-130 aircraft. Phase 5: flight service and inspection. Final report

    International Nuclear Information System (INIS)

    Kizer, J.A.

    1981-10-01

    Inspections of the C-130 composite-reinforced center wings were conducted over the flight service monitoring period of more than six years. Twelve inspections were conducted on each of the two C-130H airplanes having composite reinforced center wing boxes. Each inspection consisted of visual and ultrasonic inspection of the selective boron-epoxy reinforced center wings which included the inspection of the boron-epoxy laminates and the boron-epoxy reinforcement/aluminum structure adhesive bondlines. During the flight service monitoring period, the two C-130H aircraft accumulated more than 10,000 flight hours and no defects were detected in the inspections over this period. The successful performance of the C-130H aircraft with composite-reinforced center wings allowed the transfer of the responsibilities of inspecting and maintaining these two aircraft to the U. S. Air Force

  19. Bridging of inspection with corrosion management

    International Nuclear Information System (INIS)

    Zamaluddin Ali; Mohd Hawari Hassan; Rohana Jaafar

    2009-01-01

    Formerly, Inspection and Corrosion Engineers have less interaction and sharing of information to each other even they are working in the same plant or organization. Inspection finding either from visual inspection or NDT techniques rarely shared with corrosion engineers. Similarly corrosion engineers rarely discussed their corrosion prediction and potential damage mechanism with inspection engineers. A demanding request of more holistic plant safety and asset integrity promoted the introduction and implementation of Risk Based Inspection (RBI). RBI analysis demands the input mainly from both disciplines i.e. Inspection and Corrosion Engineers. Most of RBI methodologies are once-off analysis approach which also promoted once-off interaction between Inspection and Corrosion Engineers. PETRONAS has developed a methodology with supporting software, integrating both Inspection and Corrosion disciplines. PETRONAS Risk Based Inspection (PRBI) is intended to promote continuous integration of Inspection and Corrosion management of the plant through out the whole life cycle starting from the design stage to fabrication, operation and decommissions stage. (author)

  20. Inspection, evaluation and maintenance guidelines for reactor vessel internals in JAPAN

    International Nuclear Information System (INIS)

    Sakashita, Akihiro; Goto, Tomoya; Hirano, Shinro; Dozaki, Koji

    2010-01-01

    Inspection and Evaluation Guidelines for reactor internals has been taken into the Rules on Fitness-for–Service for Nuclear Power Plants of The Japan Society of Mechanical Engineers. It is a base of the maintenance plan of each Nuclear Power Plant. A plant maintenance methodology will have more importance to maintain the plant safety and stable plant operation. This paper introduces the systematization of the maintenance such as repair, replacement, preventive maintenance in these guidelines. Maintenance methodologies are classified follows. Repair: methodology to reinforce degraded parts by some methods or prevent progress of degradation of without replacement of the existing structure when the degradation of structure is actualized. Replacement: methodology to replace the existing structure with new one when the degradation of structure is actualized. Preventive maintenance : methodology to mitigate the damaged condition. When the maintenance methodologies are implemented in the actual plant, we have to consider the feedback of the inspection program and plant life management. (author)

  1. 77 FR 22284 - Notice of Establishment of a Veterinary Services Stakeholder Registry

    Science.gov (United States)

    2012-04-13

    ... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service [Docket No. APHIS-2012-0013] Notice of Establishment of a Veterinary Services Stakeholder Registry AGENCY: Animal and Plant Health... a Veterinary Services (VS) Stakeholder Registry, an email subscription service for individuals and...

  2. Application of 4-Face Fuel Visual Inspection System during Outage in Nuclear Power Plant

    International Nuclear Information System (INIS)

    Shin, J. C.; Kim, J. I.; Choi, C. B.; Kim, Y. C.; Kang, C. B.

    2008-01-01

    Recently, as a measure to reduce an outage duration in nuclear power plants (NPPs), a four-face fuel visual inspection system (4-FFVIS) built in 4 cameras was introduced by Ahlberg Electronics, Sweden. The 4- FFVIS is used to inspect the external appearance of irradiated fuel assemblies in order to confirm their integrity against mechanical defects and foreign materials. Until now, however, a typical one-face fuel inspection system(1-FFVIS) has been world-widely utilized in NPPs. The 1-FFVIS requires four turns with 90 degree to inspect every face of the fuel assembly, causing a relatively long inspecting time. But the 4- FFVIS allow us to inspect every face of the fuel assembly at the same time. The inspection time with the 4-FFVIS may be less than two minutes per fuel assembly, whereas that with the 1-FFVIS is about six minutes per fuel assembly. In viewpoint of this merit, the 4-FFVIS is expected to be world-widely used in the near future. In this paper, the technical requirements necessary to develop the 4-FFVIS as well as some improvements to complement the current 4-FFVIS are described

  3. Technology of Inspection and Real-time Displacement Monitoring on Critical Pipe for Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Hyun, Jung Seob; Heo, Jae Sil [Korea Electric Power Research Institute, Daejeon (Korea, Republic of); Cho, Sun Young [KLES, Daejeon (Korea, Republic of); Heo, Jeong Yeol; Lee, Seong Kee [Korea South-East Power Co., Seoul (Korea, Republic of)

    2009-10-15

    High temperature steam pipes of thermal power plant are subject to a severe thermal range and usually operates well into the creep range. Cyclic operation of the plant subjects the piping system to mechanical and thermal fatigue damages. Also, poor or malfunctional supports can impose massive loads or stress onto the piping system. In order to prevent the serious damage and failure of the critical piping system, various inspection methods such as visual inspection, computational analysis and on-line piping displacement monitoring were developed. 3-dimensional piping displacement monitoring system was developed with using the aluminum alloy rod and rotary encoder sensors, this system was installed and operated on the high temperature steam piping of 'Y' thermal power plant successfully. It is expected that this study will contribute to the safety of piping system, which could minimize stress and extend the actual life of critical piping.

  4. Ergodicity of forward times of the renewal process in a block-based inspection model using the delay time concept

    International Nuclear Information System (INIS)

    Wang Wenbin; Banjevic, Dragan

    2012-01-01

    The delay time concept and the techniques developed for modelling and optimising plant inspection practice have been reported in many papers and case studies. For a system subject to a few major failure modes, component based delay time models have been developed under the assumptions of an age-based inspection policy. An age-based inspection assumes that an inspection is scheduled according to the age of the component, and if there is a failure renewal, the next inspection is always, say τ times, from the time of the failure renewal. This applies to certain cases, particularly important plant items where the time since the last renewal or inspection is a key to schedule the next inspection service. However, in most cases, the inspection service is not scheduled according to the need of a particular component, rather it is scheduled according to a fixed calendar time regardless whether the component being inspected was just renewed or not. This policy is called a block-based inspection which has the advantage of easy planning and is particularly useful for plant items which are part of a larger system to be inspected. If a block-based inspection policy is used, the time to failure since the last inspection prior to the failure for a particular item is a random variable. This time is called the forward time in this paper. To optimise the inspection interval for block-based inspections, the usual criterion functions such as expected cost or down time per unit time depend on the distribution of this forward time. We report in this paper the development of a theoretical proof that a limiting distribution for such a forward time exists if certain conditions are met. We also propose a recursive algorithm for determining such a limiting distribution. A numerical example is presented to demonstrate the existence of the limiting distribution.

  5. 78 FR 23209 - Plants for Planting Whose Importation Is Not Authorized Pending Pest Risk Analysis; Notice of...

    Science.gov (United States)

    2013-04-18

    ... addition to the NAPPRA list of quarantine pest plants. Cordia curassavica. One commenter presented evidence... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service [Docket No. APHIS-2011-0072] Plants for Planting Whose Importation Is Not Authorized Pending Pest Risk Analysis; Notice of Addition of...

  6. Inspection Database

    Data.gov (United States)

    U.S. Department of Health & Human Services — FDA is disclosing the final inspection classification for inspections related to currently marketed FDA-regulated products. The disclosure of this information is not...

  7. Automated in-core image generation from video to aid visual inspection of nuclear power plant cores

    Energy Technology Data Exchange (ETDEWEB)

    Murray, Paul, E-mail: paul.murray@strath.ac.uk [Department of Electronic and Electrical Engineering, University of Strathclyde, Technology and Innovation Centre, 99 George Street, Glasgow, G1 1RD (United Kingdom); West, Graeme; Marshall, Stephen; McArthur, Stephen [Dept. Electronic and Electrical Engineering, University of Strathclyde, Royal College Building, 204 George Street, Glasgow G1 1XW (United Kingdom)

    2016-04-15

    Highlights: • A method is presented which improves visual inspection of reactor cores. • Significant time savings are made to activities on the critical outage path. • New information is extracted from existing data sources without additional overhead. • Examples from industrial case studies across the UK fleet of AGR stations. - Abstract: Inspection and monitoring of key components of nuclear power plant reactors is an essential activity for understanding the current health of the power plant and ensuring that they continue to remain safe to operate. As the power plants age, and the components degrade from their initial start-of-life conditions, the requirement for more and more detailed inspection and monitoring information increases. Deployment of new monitoring and inspection equipment on existing operational plant is complex and expensive, as the effect of introducing new sensing and imaging equipment to the existing operational functions needs to be fully understood. Where existing sources of data can be leveraged, the need for new equipment development and installation can be offset by the development of advanced data processing techniques. This paper introduces a novel technique for creating full 360° panoramic images of the inside surface of fuel channels from in-core inspection footage. Through the development of this technique, a number of technical challenges associated with the constraints of using existing equipment have been addressed. These include: the inability to calibrate the camera specifically for image stitching; dealing with additional data not relevant to the panorama construction; dealing with noisy images; and generalising the approach to work with two different capture devices deployed at seven different Advanced Gas Cooled Reactor nuclear power plants. The resulting data processing system is currently under formal assessment with a view to replacing the existing manual assembly of in-core defect montages. Deployment of the

  8. 78 FR 79636 - Restructuring of Regulations on the Importation of Plants for Planting

    Science.gov (United States)

    2013-12-31

    ... in Washington, DC, this 20th day of December 2013. Kevin Shea, Administrator, Animal and Plant Health... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service 7 CFR Parts 319 and 340 [Docket No. APHIS-2008-0011] RIN 0579-AD75 Restructuring of Regulations on the Importation of Plants for...

  9. Aging and service wear of auxiliary feedwater pumps for PWR nuclear power plants

    International Nuclear Information System (INIS)

    Greenstreet, W.L.

    1989-01-01

    This paper describes investigations on auxiliary feedwater pumps being done under the Nuclear Plant Aging Research (NPAR) Program. Objectives of these studies are: to identify and evaluate practical, cost-effective methods for detecting, monitoring, and assessing the severity of time-dependent degradation (aging and service wear); recommend inspection and maintenance practices; establish acceptance criteria; and help facilitate use of the results. Emphasis is given to identifying and assessing methods for detecting failure in the incipient stage and to developing degradation trends to allow timely maintenance, repair or replacement actions. 3 refs

  10. In-service diagnostics of main circulating circuit pipes of WWER nuclear power plants

    International Nuclear Information System (INIS)

    Svoboda, V.; Merta, J.; Merta, V.

    1982-01-01

    The application is discussed of the acoustic emission method for testing the integrity of the components of the main circulating circuit of the WWER 440 nuclear power plant. A description is given of the main circulating circuit and a stress analysis on the basis of strength computations considering operating modes is presented. An analysis is also presented of the possible damage of the pipe material as related to the application of the acoustic emission method for in-service inspection of the pipes. Certain practical problems of application are discussed. (author)

  11. 9 CFR 93.402 - Inspection of certain aircraft and other means of conveyance and shipping containers thereon...

    Science.gov (United States)

    2010-01-01

    ... properly identified and designated inspectors to determine whether they are carrying any animal, carcass... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Inspection of certain aircraft and... requirements. 93.402 Section 93.402 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE...

  12. 9 CFR 93.502 - Inspection of certain aircraft and other means of conveyance and shipping containers thereon...

    Science.gov (United States)

    2010-01-01

    ... properly identified and designated inspectors to determine whether they are carrying any animal, carcass... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Inspection of certain aircraft and... requirements. 93.502 Section 93.502 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE...

  13. 9 CFR 93.202 - Inspection of certain aircraft and other means of conveyance and shipping containers thereon...

    Science.gov (United States)

    2010-01-01

    ... properly identified and designated inspectors to determine whether they are carrying any animal, carcass... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Inspection of certain aircraft and... requirements. 93.202 Section 93.202 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE...

  14. 9 CFR 93.302 - Inspection of certain aircraft and other means of conveyance and shipping containers thereon...

    Science.gov (United States)

    2010-01-01

    ... properly identified and designated inspectors to determine whether they are carrying any animal, carcass... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Inspection of certain aircraft and... requirements. 93.302 Section 93.302 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE...

  15. 77 FR 18272 - Uranium Enrichment Fuel Cycle Facility Inspection Reports Regarding Louisiana Energy Services LLC...

    Science.gov (United States)

    2012-03-27

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 70-3103; NRC-2010-0264] Uranium Enrichment Fuel Cycle Facility Inspection Reports Regarding Louisiana Energy Services LLC, National Enrichment Facility, Eunice... Louisiana Energy Services (LES), LLC, National enrichment Facility in Eunice, New Mexico, and has verified...

  16. 77 FR 65729 - Uranium Enrichment Fuel Cycle Facility Inspection Reports Regarding Louisiana Energy Services LLC...

    Science.gov (United States)

    2012-10-30

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 70-3103; NRC-2010-0264] Uranium Enrichment Fuel Cycle Facility Inspection Reports Regarding Louisiana Energy Services LLC, National Enrichment Facility, Eunice... Services (LES), LLC, National Enrichment Facility in Eunice, New Mexico, and has verified that cascades...

  17. Development of an automated remote inspection system for the interior of the primary containment vessel of a nuclear power plant

    International Nuclear Information System (INIS)

    Senoo, Makoto; Yoshida, Tomiharu; Omote, Tatsuyuki; Tanaka, Keiji; Koga, Kazunori

    1996-01-01

    An automated remote inspection system has been developed for the interior of the primary containment vessel of a nuclear power plant. This system consists of an inspection robot and an operator's console. The inspection robot travels along a monorail provided in the interior of the primary containment vessel. The operator's console is located in the central control room of the power plant. We have made efforts to downsize the robot and automate the inspection and monitoring machinery. As for downsizing the robot, a 152 mm wide, 290 mm high cross-sectional area and 15 kg weight can be realized using commercially available small sensors and rearranging the parts in those sensors. As for automating the inspection and monitoring, several monitoring functions are developed using image processing, frequency analysis and other techniques applied to signals from sensors such as an ITV camera, an infrared camera and a microphone, which are mounted on the robot. Endurance tests show resistance of the robot to radiational and thermal conditions is adequate for actual use in actual power plants. (author)

  18. Strategies to reduce PWR inspection time

    International Nuclear Information System (INIS)

    Guerra, J.; Gonzalez, E.

    2001-01-01

    During last few years, a constant reduction in inspection time was clearly demanded by most nuclear plant owners. This requirement has to be accomplished without any impact in inspection quality that, in general, has also to be improved. All this in a market with increasing competition that forces price reductions. Under these new demands from our customers, Tecnatom reoriented its development efforts to improve his products and services to meet this challenges. Two of our main inspection activities that have clear impact in outage duration are Steam Generator and Vessel inspections. This paper describes the improvements made in these two activities as an example of the reorientation of our development efforts with a focus on the technical improvements made on the software and robotic tools applied as in the data acquisition and analysis systems. In the Steam Generator inspections, new robots with dual guide tubes are commonly used. New eddy current instruments and software were developed to keep up with the data rates produced by the faster acquisition system. Use of automatic analysis software is also helping to improve speed while reducing cost and improving overall job quality. Production rates are close to double from the previous inspection system. (author)

  19. Inspection and repair of reactor pressure vessel (RPV) internals

    International Nuclear Information System (INIS)

    Bohmann, W.; Poetz, F.; Nicolai, M.

    1996-01-01

    The past 10 years of operation of light water reactors were characterized by intensive inspection- and repair work on vital components. For boiling water reactors (BWR) it was typical to totally replace the piping system and for pressurized water reactors (PWR) it was the step to complete steam generator (SG) replacement - besides the development of increasingly diligent inspection and repair methods for SG tubes. It can be expected that in the 10 years to come the development of inspection- and repair methods will be aimed mainly at the core internals of BWR's as well as PWR's. Our prediction is that before the end of this decade a first complete replacement of these components will be performed. Already to date a broad range of techniques are available which enable the utilities to carry out inspections and repair of components of core internals in a relatively short time and acceptable expenses. Using examples such as Fuel Alignment Pin Inspection and Replacement, Baffle Former Bolt Inspection and Replacement, Core Barrel Former Bolt Inspection which are typical for PWR's we will in the following describe the existing methods, their development and - last but not least - their successful utilization. What is going to happen in the future? Ageing of the operating plants will continue, thus requesting the plant operators as well as the service companies to work on advanced technologies to fulfill the needs of the industry. (author)

  20. 78 FR 79658 - Okanagan Specialty Fruits, Inc.; Availability of Plant Pest Risk Assessment and Environmental...

    Science.gov (United States)

    2013-12-31

    ..., DC, this 20th day of December 2013. Kevin Shea, Administrator, Animal and Plant Health Inspection... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service [Docket No. APHIS-2012-0025] Okanagan Specialty Fruits, Inc.; Availability of Plant Pest Risk Assessment and Environmental Assessment...

  1. Improvement of foundation for inspection

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-08-15

    Japan Nuclear Energy Safety Organization has been carrying out improvement of inspection system for nuclear plants in Japan since 2003FY. The new inspection system was introduced into nuclear power plants in{sub -}2008FY. In this project, improvement of comprehensive plant performance assessment and management tool for the new inspection system are developed. In 2012FY, a trend analysis method of the plant performance was developed with reference to the IAEA literature. And the trend analysis was tried based on the results of the comprehensive plant performance assessment of all domestic plants except Fukushima-Daiichi Nuclear Power Station. In addition, the teaching materials for QMS training guideline were made. And improvement of a quality management system evaluation support tool was performed. (author)

  2. Improvement of foundation for inspection

    International Nuclear Information System (INIS)

    2013-01-01

    Japan Nuclear Energy Safety Organization has been carrying out improvement of inspection system for nuclear plants in Japan since 2003FY. The new inspection system was introduced into nuclear power plants in - 2008FY. In this project, improvement of comprehensive plant performance assessment and management tool for the new inspection system are developed. In 2012FY, a trend analysis method of the plant performance was developed with reference to the IAEA literature. And the trend analysis was tried based on the results of the comprehensive plant performance assessment of all domestic plants except Fukushima-Daiichi Nuclear Power Station. In addition, the teaching materials for QMS training guideline were made. And improvement of a quality management system evaluation support tool was performed. (author)

  3. Plant specific safety inspection of German nuclear power plants taking into account the Fukushima-I (Japan) events

    International Nuclear Information System (INIS)

    2011-01-01

    The German Parliament requested (17 March 2011) a comprehensive inspection of German nuclear power plants. For this purpose independent expert commissions should perform a new risk analysis of all German NPPS and nuclear installations with respect to the lessons learned from the Fukushima (Japan) events and other extraordinary damage scenarios. The Reactor safety commission (RSK) was assigned by the German Bundesamt fuer Strahlenschutz to develop a catalogue of requirements for this safety inspection. The contribution summarizes the required inspection volume (status 30.03.2011) including the following events: natural events like earth quakes, floods, weather-based consequences and possible superposition. Additionally the following assumptions have to be considered: event independent postulated common failures or systematic faults, station blackout larger than 2 hours, long-term failure of the auxiliary cooling water supply; aggravating boundary conditions for the performance of emergency measures (non-availability of power supply), hydrogen generation and detonation hazard, restricted personnel availability, non-accessibility due to high radiation levels, impeded technical support from outside. (orig.)

  4. Upgrading elastomer seals for nuclear service

    Energy Technology Data Exchange (ETDEWEB)

    Wittich, K C; Wensel, R; LaRose, R; Kuran, S

    1995-06-01

    Pumps, valves and instruments in nuclear plants have historically contained whatever elastomer each equipment supplier traditionally used for corresponding non-nuclear service. The proliferation of elastomer compounds, and their sometimes uncertain reliability, is now being reduced by upgrading and standardizing on a handful of compounds that have each been verified to be high performers for their class of service conditions. The objective is to make cost-effective improvements in the reliability and integrity of equipment in Canadian-designed nuclear plants. The effort focuses on elastomer seals and includes: understanding sealing fundamentals, developing relevant data for superior compounds for each service, and improving quality assurance methods, including handling and inspection guidelines. In practice, discussions with plant personnel and review of plant records are the first step. Two severe-service examples are given where these needs have been met by the following progression of activities: inspecting and laboratory testing of seals removed from service, preliminary and qualification testing of improvements, introduction into service, and monitoring the upgraded seals during phase-in periods. Large gains in reliability and integrity have been demonstrated for simulated normal and accident service conditions of heat, radiation and other deteriorative influences. Significant savings in maintenance costs are also projected. (author). 2 refs., 6 figs.

  5. Upgrading elastomer seals for nuclear service

    International Nuclear Information System (INIS)

    Wittich, K.C.; Wensel, R.; LaRose, R.; Kuran, S.

    1995-06-01

    Pumps, valves and instruments in nuclear plants have historically contained whatever elastomer each equipment supplier traditionally used for corresponding non-nuclear service. The proliferation of elastomer compounds, and their sometimes uncertain reliability, is now being reduced by upgrading and standardizing on a handful of compounds that have each been verified to be high performers for their class of service conditions. The objective is to make cost-effective improvements in the reliability and integrity of equipment in Canadian-designed nuclear plants. The effort focuses on elastomer seals and includes: understanding sealing fundamentals, developing relevant data for superior compounds for each service, and improving quality assurance methods, including handling and inspection guidelines. In practice, discussions with plant personnel and review of plant records are the first step. Two severe-service examples are given where these needs have been met by the following progression of activities: inspecting and laboratory testing of seals removed from service, preliminary and qualification testing of improvements, introduction into service, and monitoring the upgraded seals during phase-in periods. Large gains in reliability and integrity have been demonstrated for simulated normal and accident service conditions of heat, radiation and other deteriorative influences. Significant savings in maintenance costs are also projected. (author). 2 refs., 6 figs

  6. Upgrading elastomer seals for nuclear service

    International Nuclear Information System (INIS)

    Wittich, K.C.; Wensel, R.; Larose, R.; Kuran, S.

    1998-01-01

    Pumps, valves and instruments in nuclear plants have historically contained whatever elastomer each equipment supplier traditionally used for corresponding non-nuclear service. The proliferation of elastomer compounds, and their sometimes uncertain reliability, is now being reduced by upgrading and standardizing on a handful of compounds that have each been verified to be high performers for their class of service conditions. The objective is to make cost-effective improvements in the reliability and integrity of equipment in Canadian-designed nuclear plants. The effort focuses on elastomer seals and includes: understanding sealing fundamentals, developing relevant data for superior compounds for each service, and improving quality assurance methods, including handling and inspection guidelines. In practice, discussion with plant personnel and review of plant records are the first step. Two severe-service examples are given where these needs have been met by the following progression of activities: inspecting and laboratory testing of seals removed from service, preliminary and qualification testing of improvements, introduction into service, and monitoring the upgraded seals during phase-in periods. Large gains in reliability and integrity have been demonstrated for simulated normal and accident service conditions of heat, radiation and other deteriorative influences. Significant savings in maintenance costs are also projected. (author)

  7. Design considerations, tooling, and equipment for remote in-service inspection of radioactive piping and pressure-vessel systems

    International Nuclear Information System (INIS)

    Swannack, D.L.; Schmoker, D.S.

    1983-01-01

    This paper summarizes results obtained in use of remotely-operated nondestructive testing (NDT) equipment for inspection of reactor-system components. Experience obtained in operating the Fast Flux Test Facility (FFTF) has provided a basis for field verification of remote NDT equipment designs and has suggested development improvements. Remote Viewing and data gathering systems used include periscopes, borescopes, fiberscopes, hybrid borescopes/fiberscopes, and closed circuit television. A summary of design consideration for inspection equipment and power plant design is presented to achieve improved equipment operation and reduction of plant maintenance downtime

  8. Qualification of NDT systems for in-service inspections of nuclear power plant pressure vessels; Ydinvoimalaitosten paineastioiden maeaeraeaikaistarkastuksissa kaeytettaevien NDT-jaerjestelmien paetevoeinti

    Energy Technology Data Exchange (ETDEWEB)

    Elfving, K

    1998-11-01

    The goal of this study is to determine the requirements of the in-service inspection qualification in Europe, their feasibility in practice and to find out possible manufacture defects in test pieces used in practical trials. The literature study consists of qualification requirements set by European regulatory bodies and by the European nuclear power utilities. Also a brief summary of qualification requirements set by ASME Code, Section XI and comparison between ASME and European qualification requirements is included 24 refs.

  9. Application of risk-based methods for inspection of nuclear power plant components

    International Nuclear Information System (INIS)

    Balkey, K.R.

    1992-01-01

    In-service inspections (ISIs) can play a significant role in minimizing equipment and structural failures. All aspects of inspections, i.e., objectives, method, timing, and the acceptance criteria for detected flaws can affect the probability of component failure. Where ISI programs exist, they are primarily based on prior experience and engineering judgment. At best, some include an implicit consideration of risk (probability of failure multiplied by consequence). Since late 1988, a multidisciplined American Society of Mechanical Engineers (ASME) Research Task Force on Risk-Based Inspection Guidelines has been addressing the general question of how to formally incorporate risk considerations into plans and requirements for the ISI of components and structural systems. The task force and steering committee that guided the project have concluded that appropriate analytical methods exist for evaluating and quantifying risks associated with pressure boundary and structural failures. With the support of about a dozen industry and government organizations, the research group has recommended a general methodology for establishing a risk-based inspection program that could be applied to any nuclear system or structural system

  10. In-service Inspection of Radioactive Waste Tanks at the Savannah River Site – 15410

    Energy Technology Data Exchange (ETDEWEB)

    Wiersma, Bruce [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Maryak, Matthew [Savannah River Remediation, LLC., Aiken, SC (United States); Baxter, Lindsay [Univ. of Notre Dame, IN (United States); Harris, Stephen [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Elder, James [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2015-01-12

    Liquid radioactive wastes from the Savannah River Site (SRS) separation process are stored in large underground carbon steel tanks. The high level wastes are processed in several of the tanks and then transferred by piping to other site facilities for further processing before they are stabilized in a vitrified or grout waste form. Based on waste removal and processing schedules, many of the tanks will be required to be in service for times exceeding the initial intended life. Until the waste is removed from storage, transferred, and processed, the materials and structures of the tanks must maintain a confinement function by providing a barrier to the environment and by maintaining acceptable structural stability during design basis events, which include loadings from both normal service and abnormal (e.g., earthquake) conditions. A structural integrity program is in place to maintain the structural and leak integrity functions of these waste tanks throughout their intended service life. In-service inspection (ISI) is an essential element of a comprehensive structural integrity program for the waste tanks at the Savannah River Site (SRS). The ISI program was developed to determine the degree of degradation the waste tanks have experienced due to service conditions. As a result of the inspections, an assessment can be made of the effectiveness of corrosion controls for the waste chemistry, which precludes accelerated localized and general corrosion of the waste tanks. Ultrasonic inspections (UT) are performed to detect and quantify the degree of general wall thinning, pitting and cracking as a measure of tank degradation. The results from these inspections through 2013, for the 27 Type III/IIIA tanks, indicate no reportable in-service corrosion degradation in the primary tank (i.e., general, pitting, or cracking). The average wall thickness for all tanks remains above the manufactured nominal thickness minus 0.25 millimeter and the largest pit identified is

  11. Corrosion Assessment by Using Risk-Based Inspection Method for Petrochemical Plant - Practical Experience

    International Nuclear Information System (INIS)

    Choi, Song Chun; Song, Ki Hun

    2009-01-01

    Corrosion assessment has a number of uses but the use considered here is as a precursor to Risk-Based Inspection (RBI) planning. Systematic methods consisting of technical modules of RBI program were used to assess the effect of specific corrosion mechanism on the probability of failure in equipment of petrochemical plants. Especially in part of the damage and corrosion assessment, screening step involved evaluating the combinations of process conditions and construction materials for each equipment item in order to determine which damage mechanisms are potentially active. For general internal corrosion, either API 510 or API 570 was applied as the damage rate in the calculation to determine the remaining life and inspection frequency. In some cases, a measured rate of corrosion may not be available. The technical modules of RBI program employ default values for corrosion, typically derived from published data or from experience with similar processes, for use until inspection results are available. This paper describes the case study of corrosion and damage assessment by using RBI methodology in petrochemical plant. Specifically, this paper reports the methodology and the results of its application to the petrochemical units using the KGS-RBI TM program, developed by the Korea Gas Safety Corporation to suit Korean situation in conformity with API 581 Codes

  12. Practical experience and problems in the inspection work during test and routine operation of nuclear power plants

    International Nuclear Information System (INIS)

    Backstroem, T.

    1977-01-01

    A brief description is given of the Swedish Nuclear Power Inspectorate (SNPI) and its working methods in the field of licensing procedures and inspection activities. SNPI has introduced a system to be kept continuously informed about the operation of the nuclear power plants. This information is used in the preparation work preceding the inspections. Experience obtained from the inspection activities show that inspection frequency has been lower than planned. Documentation can be improved and that good relations between the authority and the utilities, including the operating personnel, is to the benefit of the nuclear safety. (author)

  13. Advanced inspection technology for non intrusive inspection (NII) program

    International Nuclear Information System (INIS)

    Zamir Mohamed Daud

    2003-01-01

    In the current economic environment, plants and facilities are under pressure to introduced cost saving as well as profit maximising measures. Among the many changes in the way things are run is a move towards Risk Based Inspection (RBI), with an emphasis on longer operating periods between shutdowns as well as to utilise components to their maximum capability. Underpinning and RBI program requires good data from an effective online inspections program, which would not require the shutdown of critical components. One methodology of online inspection is known as Non Intrusive Inspection (NII), an inspection philosophy with the objective of replacing internal inspection of a vessel by doing Non Destructive Testing (NDT) and inspections externally. To this end, a variety of advanced NDT techniques are needed to provide accurate online measurements. (Author)

  14. Operational inspections

    International Nuclear Information System (INIS)

    Bystersky, M.

    1997-01-01

    Special equipment is described, designed for inspection of reactor pressure vessels performed from the inside. Central shaft manipulator ZMM-5 is available for crack detection control using ultrasound and eddy currents, for visual check of surfaces, repair works at the reactor pressure vessel, and hardness measurements. The manipulator consists of the manipulator bridge, a cable container, shaft segments, a control mechanism and auxiliary parts. Eight inspections were performed at the Bohunice nuclear power plant and two at the Paks nuclear power plant. (M.D.)

  15. Wind power plant system services

    DEFF Research Database (Denmark)

    Basit, Abdul; Altin, Müfit

    Traditionally, conventional power plants have the task to support the power system, by supplying power balancing services. These services are required by the power system operators in order to secure a safe and reliable operation of the power system. However, as in the future the wind power...... is going more and more to replace conventional power plants, the sources of conventional reserve available to the system will be reduced and fewer conventional plants will be available on-line to share the regulation burden. The reliable operation of highly wind power integrated power system might...... then beat risk unless the wind power plants (WPPs) are able to support and participate in power balancing services. The objective of this PhD project is to develop and analyse control strategies which can increase the WPPs capability to provide system services, such as active power balancing control...

  16. Detailed simulation of ultrasonic inspections

    International Nuclear Information System (INIS)

    Chaplin, K.R.; Douglas, S.R.; Dunford, D.

    1997-01-01

    Simulation of ultrasonic inspection of engineering components have been performed at the Chalk River Laboratories of AECL for over 10 years. The computer model, called EWE for Elastic Wave Equations, solves the Elastic Wave Equations using a novel finite difference scheme. It simulates the propagation of an ultrasonic wave from the transducer to a flaw, the scatter of waves from the flaw, and measurement of signals at a receive transducer. Regions of different materials, water and steel for example, can be simulated. In addition, regions with slightly different material properties from the parent material can be investigated. The two major types of output are displays of the ultrasonic waves inside the component and the corresponding A-scans. EPRI and other organizations have used ultrasonic models for: defining acceptable ultrasonic inspection procedures, designing and evaluating inspection techniques, and for quantifying inspection reliability. The EWE model has been applied to the inspection of large pipes in a nuclear plant, gas pipeline welds and steam generator tubes. Most recent work has dealt with the ultrasonic inspection of pressure tubes in CANDU reactors. Pressure tube inspections can reliably detect and size defects; however, there are improvements that can be made. For example, knowing the sharpness of a flaw-tip is crucial for fitness for service assessments. Computer modelling of the ultrasonic inspection of flaws with different root radius has suggested inspection techniques that provide flaw tip radius information. A preliminary investigation of these methods has been made in the laboratory. The basis for the model will be reviewed at the presentation. Then the results of computer simulations will be displayed on a PC using an interactive program that analyzes simulated A-scans. This software tool gives inspection staff direct access to the results of computer simulations. (author)

  17. The optimal amount and allocation of of sampling effort for plant health inspection

    NARCIS (Netherlands)

    Surkov, I.; Oude Lansink, A.G.J.M.; Werf, van der W.

    2009-01-01

    Plant import inspection can prevent the introduction of exotic pests and diseases, thereby averting economic losses. We explore the optimal allocation of a fixed budget, taking into account risk differentials, and the optimal-sized budget to minimise total pest costs. A partial-equilibrium market

  18. Toward a drone-based EL and PL inspection tool for PV power plants

    DEFF Research Database (Denmark)

    Riedel, Nicholas; Benatto, Gisele Alves dos Reis; Thorsteinsson, Sune

    2017-01-01

    of image detail and qualitative insight compared to IR thermography. Furthermore, detection and identification of incipient or severe faults in PV panels is more straightforward.This project proposes for the first time a fast and accurate automatic drone-based inspection method for large PV plants...

  19. Research and development on in-service inspection system for reactor vessel of FBR's

    International Nuclear Information System (INIS)

    Rindo, Hiroshi; Mitabe, Noriaki; Ara, Kuniaki; Nagai, Keiichi; Otaka, Masahiko

    1993-01-01

    In-Service Inspection (ISI) is required for main components and piping of FBRs. Visual test and volumetric examination of the reactor vessel (RV) from the outer surface are to be performed under severe conditions such as limited space, high temperature and high gamma dose rate during the reactor shutdown. Therefore, ISI should be performed by using a remote operation system, and the ISI system should be very compact. PNC has been developing the ISI system to apply to the RV inspection. Verification and performance tests of ISI system were carried out by use of the RV test model. This paper describes the system structure, system verification tests including operation and controlling the inspection robot, the functions of the visual test and the volumetric examination under the high temperature

  20. Savannah River Plant waste tank inspection manual

    International Nuclear Information System (INIS)

    McNatt, F.G.

    1979-01-01

    This manual is to aid in making visual and photographic inspections and steel thickness measurements of Building 241-F and -H underground waste storage tanks. It describes the inspection program, the storage tanks, the equipment and techniques used and the results of their application, and the inspection recordkeeping methods

  1. Development of Heavy-Duty and High-Precision Hydraulic Manipulator for Inspection, Maintenance and Decommission of Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Sung Uk; Seo, Yong-chil; Jung, Kyung Min; Kim, Chang-hoi; Choi, Byung-seon; Moon, Jei-kwon [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2016-10-15

    Robotic manipulators have been used for inspection, maintenance and decommission of nuclear power plants because nuclear power plants have high radiation and human workers cannot easily access the plants. And also, to inspecting, maintaining and decommissioning nuclear power plants require various manipulators. Only one manipulator cannot response to many required tasks. The existing manipulators that was used at nuclear power plants can only operate only focused specific task and cannot be used at several tasks. The actuators used at manipulators are varied and many companies sell actuators depending on power, torque and speed. However, the commercial product is not standardized. Therefore, the development of manipulator is time consuming and expensive. The essential item of a manipulator is an actuator module. If actuator module is standardized, it’s easier to develop a manipulator and also maintain a manipulator. Recently, manipulator having high-radiation, high-duty and high-precision is necessary to inspection, maintain and decommissioning of nuclear power plants. Hydraulic actuator has been used to development high-duty manipulator. But control performance of a hydraulic actuator is not better than that of an electric actuator so that hydraulic manipulator cannot easily satisfy the required precision. In this paper, we developed high-duty and high-precision actuator modules and hydraulic manipulator using the developed actuator modules. The developed hydraulic manipulator have a payload of 250kg and a precision of ±1mm. Four modularized hydraulic actuator modules were developed for inspection, maintenance and decommission. Using the developed actuator modules, the manipulator for decommissioning is easily developed. And also, various manipulators having different kinematic structure for specific tasks will be easily developed by using hydraulic modules.

  2. Development of Heavy-Duty and High-Precision Hydraulic Manipulator for Inspection, Maintenance and Decommission of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Lee, Sung Uk; Seo, Yong-chil; Jung, Kyung Min; Kim, Chang-hoi; Choi, Byung-seon; Moon, Jei-kwon

    2016-01-01

    Robotic manipulators have been used for inspection, maintenance and decommission of nuclear power plants because nuclear power plants have high radiation and human workers cannot easily access the plants. And also, to inspecting, maintaining and decommissioning nuclear power plants require various manipulators. Only one manipulator cannot response to many required tasks. The existing manipulators that was used at nuclear power plants can only operate only focused specific task and cannot be used at several tasks. The actuators used at manipulators are varied and many companies sell actuators depending on power, torque and speed. However, the commercial product is not standardized. Therefore, the development of manipulator is time consuming and expensive. The essential item of a manipulator is an actuator module. If actuator module is standardized, it’s easier to develop a manipulator and also maintain a manipulator. Recently, manipulator having high-radiation, high-duty and high-precision is necessary to inspection, maintain and decommissioning of nuclear power plants. Hydraulic actuator has been used to development high-duty manipulator. But control performance of a hydraulic actuator is not better than that of an electric actuator so that hydraulic manipulator cannot easily satisfy the required precision. In this paper, we developed high-duty and high-precision actuator modules and hydraulic manipulator using the developed actuator modules. The developed hydraulic manipulator have a payload of 250kg and a precision of ±1mm. Four modularized hydraulic actuator modules were developed for inspection, maintenance and decommission. Using the developed actuator modules, the manipulator for decommissioning is easily developed. And also, various manipulators having different kinematic structure for specific tasks will be easily developed by using hydraulic modules

  3. Development of inspection technology for inner wall pipe of aging nuclear power plant

    International Nuclear Information System (INIS)

    Ito, Fuyumi; Nishimura, Akihiko

    2013-01-01

    Careful inspection should be paid on aging nuclear power plants. Due to the Fukushima BWR accident, more advanced inspection techniques are now requested in Japan. To find SCC along welded sections by Ultrasonic Testing or Eddy Current Testing is difficult due to the low S/N. Here we propose to apply Magnetic particle Testing (MT) on the inspection. MT uses magnetic particles uniting fluorescent pigment. It is a weak point of MT that uniting particles and pigment is breakable. To extend the lifetime, we developed unique capsule for the magnetic particle to coexist with fluorescent pigment. In addition, Laser-Induced Breakdown Spectroscopy (LIBS) used for the laser cleaning of materials, is reported in this paper as a preliminary experiment. The intensity of 621nm peak gradually decreases over time. This result will become a measure of the degree of oxide layer removal. (author)

  4. In-service inspection of the vessels of nuclear submarine reactors

    International Nuclear Information System (INIS)

    Saglio, R.; Mercier L'Abbe, G.

    1977-02-01

    Description is given of a machine of automatic inspection of the reactor vessels of nuclear submarines, that was developed by the French Atomic Energy Commission (CEA). A focused ultrasound testing method is used. The equipment such described meets the safety requirements prescribed for the primary circuits of nuclear submarine boiler plants. The sensitivity and resolution power of the apparatus allow such high precision to be obtained as rupture mechanics gains a credibility that could not have been obtained with using conventional apparatus [fr

  5. Evolution in the design and development of the in-service inspection device for the Indian 500 MWe Fast Breeder Reactor

    International Nuclear Information System (INIS)

    Singh, Ashutosh Pratap; Rajagopalan, C.; Rakesh, V.; Rajendran, S.; Venugopal, S.; Kasiviswanathan, K.V.; Jayakumar, T.

    2011-01-01

    Highlights: → Conceptual study on the configuration of an ISI device for FBR interspace environment has been carried out. → Prototyping of the concept has been experimentally validated in a mock up. → High temperature version of the ISI device has been made and tested in mock-up. Further experimentation is underway. → Simulation of different configurations of the device has been carried out with respect to reduced gap between main vessel and safety vessel for future FBRs. → Studies on wheel lining for the device have been carried out at 150 o C for better traction and payload capability. - Abstract: In-service inspection (ISI) plays a major role in monitoring the condition of nuclear power plant structures and components. Based on the information gathered during inspection and the studies carried out, it is possible to assess the extent of damage and take corrective measures to keep effects of ageing under control. In nuclear power plants comprehensive ISI is dictated by issues of increased safety to personnel and equipment, and efficiently enhances the plant life. A special emphasis has been laid on the development of robotic devices for the ISI of the indigenous Indian 500 MWe Prototype Fast Breeder Reactor (FBR) components. This paper traces the experiments and simulations in the key developments of a robotic device, for the ISI of main vessel and safety vessel of FBRs, carried out at Indira Gandhi Centre for Atomic Research, India.

  6. 78 FR 52127 - Tobacco Inspection and Grading Services: Notice of Request for an Extension of a Currently...

    Science.gov (United States)

    2013-08-22

    ... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service [AMS-CN-13-0046] Tobacco Inspection and...: Agricultural Marketing Service, USDA. ACTION: Notice and request for comments. SUMMARY: In accordance with the... 16, 2013. Rex A. Barnes, Associate Administrator, Agricultural Marketing Service. [FR Doc. 2013-20439...

  7. Human reliability in non-destructive inspections of nuclear power plant components: modeling and analysis

    Energy Technology Data Exchange (ETDEWEB)

    Vasconcelos, Vanderley de; Soares, Wellington Antonio; Marques, Raíssa Oliveira; Silva Júnior, Silvério Ferreira da; Raso, Amanda Laureano, E-mail: vasconv@cdtn.br, E-mail: soaresw@cdtn.br, E-mail: raissaomarques@gmail.com, E-mail: silvasf@cdtn.br, E-mail: amandaraso@hotmail.com [Centro de Desenvolvimento da Tecnologia Nuclear (CDTN/CNEN-MG), Belo Horizonte, MG (Brazil)

    2017-07-01

    Non-destructive inspection (NDI) is one of the key elements in ensuring quality of engineering systems and their safe use. NDI is a very complex task, during which the inspectors have to rely on their sensory, perceptual, cognitive, and motor skills. It requires high vigilance once it is often carried out on large components, over a long period of time, and in hostile environments and restriction of workplace. A successful NDI requires careful planning, choice of appropriate NDI methods and inspection procedures, as well as qualified and trained inspection personnel. A failure of NDI to detect critical defects in safety-related components of nuclear power plants, for instance, may lead to catastrophic consequences for workers, public and environment. Therefore, ensuring that NDI methods are reliable and capable of detecting all critical defects is of utmost importance. Despite increased use of automation in NDI, human inspectors, and thus human factors, still play an important role in NDI reliability. Human reliability is the probability of humans conducting specific tasks with satisfactory performance. Many techniques are suitable for modeling and analyzing human reliability in NDI of nuclear power plant components. Among these can be highlighted Failure Modes and Effects Analysis (FMEA) and THERP (Technique for Human Error Rate Prediction). The application of these techniques is illustrated in an example of qualitative and quantitative studies to improve typical NDI of pipe segments of a core cooling system of a nuclear power plant, through acting on human factors issues. (author)

  8. Human reliability in non-destructive inspections of nuclear power plant components: modeling and analysis

    International Nuclear Information System (INIS)

    Vasconcelos, Vanderley de; Soares, Wellington Antonio; Marques, Raíssa Oliveira; Silva Júnior, Silvério Ferreira da; Raso, Amanda Laureano

    2017-01-01

    Non-destructive inspection (NDI) is one of the key elements in ensuring quality of engineering systems and their safe use. NDI is a very complex task, during which the inspectors have to rely on their sensory, perceptual, cognitive, and motor skills. It requires high vigilance once it is often carried out on large components, over a long period of time, and in hostile environments and restriction of workplace. A successful NDI requires careful planning, choice of appropriate NDI methods and inspection procedures, as well as qualified and trained inspection personnel. A failure of NDI to detect critical defects in safety-related components of nuclear power plants, for instance, may lead to catastrophic consequences for workers, public and environment. Therefore, ensuring that NDI methods are reliable and capable of detecting all critical defects is of utmost importance. Despite increased use of automation in NDI, human inspectors, and thus human factors, still play an important role in NDI reliability. Human reliability is the probability of humans conducting specific tasks with satisfactory performance. Many techniques are suitable for modeling and analyzing human reliability in NDI of nuclear power plant components. Among these can be highlighted Failure Modes and Effects Analysis (FMEA) and THERP (Technique for Human Error Rate Prediction). The application of these techniques is illustrated in an example of qualitative and quantitative studies to improve typical NDI of pipe segments of a core cooling system of a nuclear power plant, through acting on human factors issues. (author)

  9. Visual inspection technology of the narrow and small confined area for monitoring feederpipe support of pressure tube in calandria reactor

    Energy Technology Data Exchange (ETDEWEB)

    Cho, Jae Wan; Lee, Nam Ho; Choi, Young Soo [Korea Atomic Energy Research Institute, Taejon (Korea)

    1999-12-01

    There are 760 feederpipes, which they are connected to inlet/outlet of the 380 pressure tube channels on the front of the calandria, in CANDU-type Reactor of Wolsung Nuclear Power Plant. As an ISI(In-Service Inspection) and PSI (Post-Service Inspection) requirements, maintenance activities of measuring the thickness of curvilinear part of feederpipe and inspecting the feederpipe support area within calandria are needed to ensure continued reliable operation of nuclear power plant. And ultrasonic probe is used to measure the thickness of curvilinear part of feederpipe, however workers are exposed to radioactivity irradiation during the measurement period. But, it is exposed to radioactivity irradiation during the measurement period. But, it is impossible to inspect feederpipe support area thoroughly because of narrow and confined accessibility, that is , an inspection space between the pressure tube channels is less than 100 mm and pipes in feederpipe support area are congested. And also, workers involved in inspecting feederpipe support area are under the jeopardy of high-level radiation exposure. Concerns about sliding home, which make the move of feederpipe connected to pressure tube channel smooth as pressure tube expands and contracts in its axial direction, stuck to feedeerpipe support and some of the structural components have made necessary the development of video inspection probe system with narrow and confined accessibility to observe and inspect feederpipe support area more close. Using video inspection probe system, it is possible to inspect and repair abnormality of feederpipe support connected to pressure tube channels of the calandria more accurate and quantative than naked eye. Therefore, that will do much for ensuring safety of CANDU-type nuclear power plant. 45 figs.,31 tabs. (Author)

  10. Managing aging in nuclear power plants: Insights from NRC's maintenance team inspection reports

    International Nuclear Information System (INIS)

    Fresco, A.; Subudhi, M.

    1994-01-01

    Age-related degradation is managed through the maintenance program of a nuclear plant. From 1988 to 1991, the Nuclear Regulatory Commission (NRC) evaluated the maintenance program of every nuclear power plant in the United States. The authors reviewed 44 out of a total of 67 of the reports issued by the NRC on these in-depth team inspections. The reports were reviewed for insights into the strengths and weaknesses of the programs as related to the need to understand and manage the effects of aging on nuclear plant structures, systems, and components. The authors' conclusions are presented. 6 refs

  11. Nuclear Plant Aging Research (NPAR) program plan

    International Nuclear Information System (INIS)

    1985-07-01

    The nuclear plant aging research described in this plan is intended to resolve issues related to the aging and service wear of equipment and systems at commercial reactor facilities and their possible impact on plant safety. Emphasis has been placed on identification and characterization of the mechansims of material and component degradation during service and evaluation of methods of inspection, surveillance, condition monitoring and maintenance as means of mitigating such effects. Specifically the goals of the program are as follows: (1) to identify and characterize aging and service wear effects which, if unchecked, could cause degradation of structures, components, and systems and thereby impair plant safety; (2) to identify methods of inspection, surveillance and monitoring, or of evaluating residual life of structures, components, and systems, which will assure timely detection of significant aging effects prior to loss of safety function; and (3) to evaluate the effectiveness of storage, maintenance, repair and replacement practices in mitigating the rate and extent of degradation caused by aging and service wear

  12. Risk-based inspection of nuclear power plants

    International Nuclear Information System (INIS)

    Masopust, R.

    1995-01-01

    A multidiscipline research programme was developed in the USA to establish risk-based inspections for NPP structures and equipment components. Based on this US research effort, the risk-based procedure for developing inspection guidelines for NPPs is described. The procedure includes the definition of systems, qualitative risk assessment, qualitative risk analysis and development of the inspection programme. The method, when adopted and modified, is recommended also for risk-based inspections of structures and equipment of WWER-type NPPs. A pilot application of the method to unit 1 of the Surry NPP is summarized. (Z.S.) 1 tab., 1 fig., 5 refs

  13. Risk-based methodology for USNRC inspections

    International Nuclear Information System (INIS)

    Wong, S.M.; Holahan, G.M.; Chung, J.W.; Johnson, M.R.

    1995-01-01

    This paper describes the development and trial applications of a risk-based methodology to enhance the inspection processes for US nuclear power plants. Objectives of risk-based methods to complement prescriptive engineering approaches in US Nuclear Regulatory Commission (USNRC) inspection programs are presented. Insights from time-dependent risk profiles of plant configurational from Individual Plant Evaluation (IPE) studies were integrated to develop a framework for optimizing inspection efforts in NRC regulatory initiatives. Lessons learned from NRC pilot applications of the risk-based methodology for evaluation of the effectiveness of operational risk management programs at US nuclear power plant sites are also discussed

  14. Laboratory services series: an electrical outlet and corded equipment inspection program

    International Nuclear Information System (INIS)

    Davis, E.A.

    1976-04-01

    A research and development laboratory has thousands of electrical outlets providing power to laboratories, offices, shops, and service areas. These outlets provide power for a wide variety of portable equipment and tools that are equipped with cord and plug. Electric safety requires a periodic check of outlet grounding capability and continuing inspection and repair of corded equipment. Personnel, equipment, reports, procedures, and schedule requirements are reported

  15. In-service inspection of fertilizer and steel and ship building industries

    International Nuclear Information System (INIS)

    Sanaullah, Md.

    1998-01-01

    There is a good number of fertilizer factories, and steel and ship building industries in Bangladesh. Different NDT methods are being used for in-service inspection of these industries to ensure product reliability, to prevent accident and save human life, to maintain a uniform quality level, to lower manufacturing cost and to minimize the wastage of time and materials and for other benefits. (author)

  16. Results of automatic system implementation for Cofrentes nuclear power plant LPRM inspection execution

    International Nuclear Information System (INIS)

    Curiel, M.; Palomo, M. J.; Rodriguez, M.; Arnaldos, A.

    2010-10-01

    During this presentation we are going to introduce the results of Cofrentes nuclear power plant automation of the detection system LPRM (Local Power Range Monitor) inspection procedure. An LPRM test system has been developed and it consists in a software application and data acquisition hardware that performs automatically the complete detection system process: 1) Refuelling, storage and operation inspection: ramp voltage generation, measured voltage plateaux evaluation, qualification report emission. 2) Historical analysis to scan burn evolution. The inspections differentiations are developed by the different specifications that it has to fulfil: 1) Operation inspection: it is made to check the fission bolt wearing, the detection system functioning and to analyse malfunctioning. From technical specifications and curves analyses it can be determined each LPRM substitution. 2) Storage inspection: it is made to check the correct functioning and isolation losses before being installed in the core during refueling. 3) Refueling inspection: it is checked that storage LPRM installation is correct and that they are ready for new fuel cycle. The software application LPRM test has been developed by National Instruments LabVIEWTM, and it performs the following actions: 1) Protocol IEEE-488 (GPI B) control of the source Keithley 237. This source generates the ramp voltage and measure voltage. 2) Information acquisition of storage, process and source, identifying LPRM and realization conditions of the same. 3) Data analysis and conditions report. 4) Historical comparative analysis. (Author)

  17. Results of automatic system implementation for Cofrentes nuclear power plant LPRM inspection execution

    Energy Technology Data Exchange (ETDEWEB)

    Curiel, M. [Logistica y Acondicionamientos Industriales SAU, Sorolla Center, local 10, Av. de las Cortes Valencianas No. 58, 46015 Valencia (Spain); Palomo, M. J. [ISIRYM, Universidad Politecnica de Valencia, Camino de Vera s/n, Valencia (Spain); Rodriguez, M. [Iberdrola Generacion S. A., Central Nuclear Cofrentes, Carretera Almansa Requena s/n, 04662 Cofrentes, Valencia (Spain); Arnaldos, A., E-mail: m.curiel@lainsa.co [TITANIA Servicios Tecnologicos SL, Sorollo Center, local 10, Av. de las Cortes Valencianas No. 58, 46015 Valencia (Spain)

    2010-10-15

    During this presentation we are going to introduce the results of Cofrentes nuclear power plant automation of the detection system LPRM (Local Power Range Monitor) inspection procedure. An LPRM test system has been developed and it consists in a software application and data acquisition hardware that performs automatically the complete detection system process: 1) Refuelling, storage and operation inspection: ramp voltage generation, measured voltage plateaux evaluation, qualification report emission. 2) Historical analysis to scan burn evolution. The inspections differentiations are developed by the different specifications that it has to fulfil: 1) Operation inspection: it is made to check the fission bolt wearing, the detection system functioning and to analyse malfunctioning. From technical specifications and curves analyses it can be determined each LPRM substitution. 2) Storage inspection: it is made to check the correct functioning and isolation losses before being installed in the core during refueling. 3) Refueling inspection: it is checked that storage LPRM installation is correct and that they are ready for new fuel cycle. The software application LPRM test has been developed by National Instruments LabVIEWTM, and it performs the following actions: 1) Protocol IEEE-488 (GPI B) control of the source Keithley 237. This source generates the ramp voltage and measure voltage. 2) Information acquisition of storage, process and source, identifying LPRM and realization conditions of the same. 3) Data analysis and conditions report. 4) Historical comparative analysis. (Author)

  18. Ultrasonic Inspection of Cracks in Stud Bolts of Reactor Vessels in Nuclear Power Plants by Signal Processing of Differential Operation

    International Nuclear Information System (INIS)

    Choi, Sang Woo; Lee, Joon Hyun; Oh, Won Deok

    2005-01-01

    The stud bolt is one of crucial parts for safe operation of reactor vessels in nuclear power plants, Crack initiation and propagation were reported in stud bolts that arc used for closure of reactor vessel and head, Stud bolts are inspected by ultrasonic technique during overhaul periodically for the prevention of stud bolt failure which could induce radioactive leakage from nuclear reactor, In conventional ultrasonic testing for inspection of stud bolts, cracks are detected by using shadow effect It takes too much time to inspect stud bolts by using conventional ultrasonic technique. In addition, there were numerous spurious signals reflected from every oblique surfaces of thread, In this study, the signal processing technique for enhancing conventional ultrasonic technique was introduced for inspecting stud bolts. The signal processing technique provides removing spurious signal reflected from every oblique surfaces of thread and enhances detectability of defects. Detectability for small crack was enhanced by using this signal processing in ultrasonic inspection of stud bolts in Nuclear Power Plants

  19. AECL experience in fuel channel inspection

    Energy Technology Data Exchange (ETDEWEB)

    Van Drunen, G. [Atomic Energy of Canada Limited, Chalk River, Ontario (Canada); Gunn, R. [Atomic Energy of Canada Limited, Mississauga, Ontario (Canada); Mayo, W.R. [Atomic Energy of Canada Limited, Chalk River, Ontario (Canada); Scott, D.A. [Atomic Energy of Canada Limited, Mississauga, Ontario (Canada)

    1999-06-01

    Inspection of CANDU fuel channels (FC) is performed to ensure safe and economic reactor operation. CANDU reactor FCs have features that make them a unique non-destructive testing (NDT) challenge. The thin, 4 mm pressure-tube wall means flaws down to about 0.1 mm deep must be reliably detected and characterized. This is one to two orders of magnitude smaller than is usually considered of significant concern for steel piping and pressure vessels. A second unique feature is that inspection sensors must operate in the reactor core--often within 20 cm of highly radioactive fuel. Work on inspection of CANDU reactor FCs at AECL dates back over three decades. In that time, AECL staff have provided equipment and conducted or supervised in-service inspections in about 250 FCs, in addition to over 8000 pre-service FCs. These inspections took place at every existing CANDU reactor except those in India and Romania. Early FC inspections focussed on measurement of changes in dimensions (gauging) resulting from exposure to a combination of neutrons, stress and elevated temperature. Expansion of inspection activities to include volumetric inspection (for flaws) started in the mid-1970s with the discovery of delayed hydride cracking in Pickering 3 and 4 rolled joints. Recognition of other types of flaw mechanisms in the 1980s led to further expansion in both pre-service and in-service inspections. These growing requirements, to meet regulatory as well as economic needs, led to the development of a wide spectrum of inspection technology that now includes tests for hydrogen concentration, structural integrity of core components, flaws, and dimensional change. This paper reviews current CANDU reactor FC inspection requirements. The equipment and techniques developed to satisfy these requirements are also described. The paper concludes with a discussion of work in progress in AECL aimed at providing state-of-the-art FC inspection services. (author)

  20. Results of 6th regular inspection of No.1 unit in Oi Power Plant

    International Nuclear Information System (INIS)

    Anon.

    1987-01-01

    This report presents results of the 6th regular inspection of the No.1 unit in the Oi Power Plant. It was carried out during the period from July 11, 1986, to January 28, 1987. The inspection covered the main unit of the nuclear reactor, facilities for the nuclear reactor cooling system, facilities for the instrumentation control system, fuel facilities, radiation control facilities, disposal facilities, nuclear reactor containment facilities, and emergency power generation system. Checking of appearance, disassemblage, leak and functions-performance of these facilities was conducted. No abnormalities were found except that significant signs were detected in 725 steam generator heat transfer pipes and that leak was suspected in 2 fuel assemblies. The pipes were repaired and the fuel assemblies were replaced. All operations involved in the inspection were performed under conditions within the permissible dose as specified in the applicable laws. Major modification work carried out during the inspection period included the adoption of a burnable poison (B Type) and the charging of fuel for high burn-up demonstration test. The exposure dose of the company members and non-company members who performed the inspection work is also shown. (Nogami, K.)

  1. Latina nuclear power plant

    International Nuclear Information System (INIS)

    1976-03-01

    In the period under review, the Latina power plant produced 1009,07 million kWh with a utilization factor of 72% and an availability factor of 80,51%. The disparity between the utilization and availability factors was mainly due to the shutdown of the plant owing to trade union strife. The reasons for non-availability (19,49%) were almost all related to the functioning of the conventional part and the general servicing of the plant (18 September-28 October). During the shutdown for maintenance, an inspection of the steel members and parts of the core stabilizing structure was made in order to check for the familiar oxidation phenomena caused by CO 2 ; the results of the inspection were all satisfactory. Operation of the plant during 1974 was marked by numerous power cutbacks as a result of outages of the steam-raising units (leaks from the manifolds) and main turbines (inspection and repairs to the LP rotors). Since it was first brought into commercial operation, the plant has produced 13,4 thousand million kWh

  2. Qualification of nuclear power plant inspection, examination, and testing personnel. Revision 1, September 1980

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    Appendix B, Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants, to 10 CFR Part 50, Domestic Licensing of Production and Utilization Facilities, requires that the quality assurance program provide for indoctrination and training of personnel performing activities affecting quality as necessary to ensure that quality assurance personnel achieve and maintain suitable proficiency. This guide describes a method acceptable to the NRC staff for complying with the Commission's regulations with regard to qualification of inspection, examination, and testing personnel for all types of nuclear power plants

  3. Evaluation of effectiveness of monorail type inspection robot at nuclear power plant

    International Nuclear Information System (INIS)

    Nakagawa, Katsuei; Kimura, Motohiko; Ito, Takao; Sasaki, Keiichi.

    1991-01-01

    An inspection robot, with a TV camera, infrared camera and microphone as sensors, was tentatively installed in the main steam tunnel room of Kashiwazaki-Kariwa N.P.S. no.1 to evaluate its effectiveness in actual plant use. After a one and a half-year run, it appeared to have the ability to perform daily patrol tasks inplace of human beings. (author)

  4. Wireless Roadside Inspection Phase II Tennessee Commercial Mobile Radio Services Pilot Test Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Franzese, Oscar [ORNL; Lascurain, Mary Beth [ORNL; Capps, Gary J [ORNL; Siekmann, Adam [ORNL

    2011-05-01

    The Federal Motor Carrier Safety Administration (FMCSA) Wireless Roadside Inspection (WRI) Program is researching the feasibility and value of electronically assessing truck and bus driver and vehicle safety at least 25 times more often than is possible using only roadside physical inspections. The WRI program is evaluating the potential benefits to both the motor carrier industry and to government. These potential benefits include reduction in accidents, fatalities and injuries on our highways and keeping safe and legal drivers and vehicles moving on the highways. WRI Pilot tests were conducted to prototype, test and demonstrate the feasibility and benefits of electronically collecting safety data message sets from in-service commercial vehicles and performing wireless roadside inspections using three different communication methods. This report summarizes the design, conduct and results of the Tennessee CMRS WRI Pilot Test. The purpose of this Pilot test was to demonstrate the implementation of commercial mobile radio services to electronically request and collect safety data message sets from a limited number of commercial vehicles operating in Tennessee. The results of this test have been used in conjunction with the results of the complimentary pilot tests to support an overall assessment of the feasibility and benefits of WRI in enhancing motor carrier safety (reduction in accidents) due to increased compliance (change in motor carrier and driver behavior) caused by conducting frequent safety inspections electronically, at highway speeds, without delay or need to divert into a weigh station

  5. Inspection qualification and implementation of ENIQ in Sweden

    International Nuclear Information System (INIS)

    Zettervall, Tommy

    2013-01-01

    Many countries are currently considering their approaches to inspection qualification and risk-informed in-service inspection (RI-ISI) and are carefully assessing experience data. In Europe most of the utilities operating nuclear power plants have joined together to form the European Network for Inspection Qualification ENIQ. In practice, qualification can be performed with varying degrees of complexity and cost, varying from capability statement based on existing evidence, through to an extensive qualification consisting of a detailed Technical Justification (TJ) together with open and blind trials on full-scale test blocks. An Inspection Qualification is an investigation and demonstration, which confirm that an inspection system has the ability to solve its specific tasks. The qualification is a Quality Assurance of an inspection system based on documents and practical trials. A reliable inspection system, based on a reliable qualification and correct prerequisites, will reduce total costs for Licensees and increase the credibility of the inspection result. To get such inspection system, which could be valid for many years, it's of necessity to fulfil all included parts in the process. It begins with the Technical Specification from Licensee, where input data and requirements about the actual component are specified. To get an inspection system that could live over time, the Technical Justification is of importance. Finally the test blocks and used simulation techniques play an important part of the final result, and these test blocks together with TJ form the basis for qualification body's decision. (author)

  6. Pipe degradation investigations for optimization of flow-accelerated corrosion inspection location selection

    International Nuclear Information System (INIS)

    Chandra, S.; Habicht, P.; Chexal, B.; Mahini, R.; McBrine, W.; Esselman, T.; Horowitz, J.

    1995-01-01

    A large amount of piping in a typical nuclear power plant is susceptible to Flow-Accelerated Corrosion (FAC) wall thinning to varying degrees. A typical PAC monitoring program includes the wall thickness measurement of a select number of components in order to judge the structural integrity of entire systems. In order to appropriately allocate resources and maintain an adequate FAC program, it is necessary to optimize the selection of components for inspection by focusing on those components which provide the best indication of system susceptibility to FAC. A better understanding of system FAC predictability and the types of FAC damage encountered can provide some of the insight needed to better focus and optimize the inspection plan for an upcoming refueling outage. Laboratory examination of FAC damaged components removed from service at Northeast Utilities' (NU) nuclear power plants provides a better understanding of the damage mechanisms involved and contributing causes. Selected results of this ongoing study are presented with specific conclusions which will help NU to better focus inspections and thus optimize the ongoing FAC inspection program

  7. Evaluation of techniques for inspection and diagnostics of HWR pressure tubes

    International Nuclear Information System (INIS)

    Choi, Jong-Ho

    2008-01-01

    Efficient and accurate inspection and diagnostic techniques for various reactor components and systems, especially pressure tubes for Heavy Water Reactors (HWRs), are an important factor in assuring reliable and safe plant operation. To foster international collaboration in the efficient and safe use of nuclear power, the IAEA conducted a Coordinated Research Project (CRP) on Inter-comparison of Techniques for HWR Pressure Tube Inspection and Diagnostics. The objective of the CRP was to inter-compare inspection and diagnostic techniques, in use and being developed, for structural integrity assessment of HWR pressure tubes. During the first phase of the CRP, participants investigated the capability of different techniques to detect and characterize flaws. During the second phase, participants collaborated to determine the hydrogen concentration and to detect and characterize hydride blisters in zirconium alloy pressure tubes. Eight organizations from six countries, which operate HWRs, have participated in this CRP, Most of the techniques examined are well established and many of them are regularly used during in-service inspection of pressure tubes. The inter-comparison of these techniques provides a platform for identifying a particular technique (or a set of techniques), which is more accurate and reliable as compared to others for a specified task. The CRP also witnessed some new methodologies, which can be implemented on in-service inspection tools. These new techniques could complement the existing ones to overcome their limitations, thereby improving the reliability and accuracy of in-service inspection. This CRP also identified future areas of research and development. (author)

  8. United States nuclear regulatory commission program for inspection of decommissioning nuclear power plants

    International Nuclear Information System (INIS)

    Harris, P.W.

    2001-01-01

    The United States Nuclear Regulatory Commission (USNRC or Commission) has been inspecting decommissioning commercial nuclear power plants in the United States (U.S.) since the first such facility permanently shutdown in September 1967. Decommissioning inspections have principally focused on the safe storage and maintenance of spent reactor fuel; occupational radiation exposure; environmental radiological releases; the dismantlement and decontamination of structures, systems, and components identified to contain or potentially contain licensed radioactive material; and the performance of final radiological survey of the site and remaining structures to support termination of the USNRC-issued operating license. Over the last 5 years, USNRC inspection effort in these areas has been assessed and found to provide reasonable confidence that decommissioning can be conducted safely and in accordance with Commission rules and regulations. Recently, the staff has achieved a better understanding of the risks associated with particular decommissioning accidents 1 and plans to apply these insights to amendments proposed to enhance decommissioning rules and regulations. The probabilities, scenarios, and conclusions resulting from this effort are being assessed as to their applicability to the inspection of decommissioning commercial power reactors. (author)

  9. United States nuclear regulatory commission program for inspection of decommissioning nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Harris, P.W. [U.S. Nuclear Regulatory Commission, Washington, DC (United States)

    2001-07-01

    The United States Nuclear Regulatory Commission (USNRC or Commission) has been inspecting decommissioning commercial nuclear power plants in the United States (U.S.) since the first such facility permanently shutdown in September 1967. Decommissioning inspections have principally focused on the safe storage and maintenance of spent reactor fuel; occupational radiation exposure; environmental radiological releases; the dismantlement and decontamination of structures, systems, and components identified to contain or potentially contain licensed radioactive material; and the performance of final radiological survey of the site and remaining structures to support termination of the USNRC-issued operating license. Over the last 5 years, USNRC inspection effort in these areas has been assessed and found to provide reasonable confidence that decommissioning can be conducted safely and in accordance with Commission rules and regulations. Recently, the staff has achieved a better understanding of the risks associated with particular decommissioning accidents 1 and plans to apply these insights to amendments proposed to enhance decommissioning rules and regulations. The probabilities, scenarios, and conclusions resulting from this effort are being assessed as to their applicability to the inspection of decommissioning commercial power reactors. (author)

  10. Ultrasonic inspection

    International Nuclear Information System (INIS)

    Satittada, Gannaga

    1984-01-01

    Ultrasonic inspection is one of the most widely used methods for nondestructive inspection. The beam of high-frequency sound wave, ultrasonic wave, is introduced into the material. It travels through the material with some attendant loss of energy and can be reflected at interfaces. The reflected beam is detected and analyzed. Ultrasonic inspection is used to detect flaws in metal parts as well as in welded, brazed and bonded joints during research work and developing production and service. It is also used to detect and locate porosity, pipe, and flakes. In addition, it can be used for the measurement of metal thickness. Ultrasonic inspection is therefore used for quality control and material inspection in all major industries

  11. Detection and mitigation of aging and service wear effects of nuclear power plant components in Canada

    International Nuclear Information System (INIS)

    Pachner, J.

    1987-07-01

    In Canada, the operational safety management of nuclear power plants employs methods which are intended to prevent, detect, correct and mitigate system and component failures from any cause, including the effects of aging and service wear degradation. The paper gives an overview of the application of these methods in the detection and mitigation of aging effects before they impact on plant safety and production reliability. Regulatory audits of these methods, to ensure that an acceptable level of plant safety is maintained by the nuclear power plant licensees, are also described. The methods are: a preventive maintenance program, Significant Event Reporting system, and a reliability based assessment of performance of safety related systems. The above methods are discussed and illustrated by examples. The soundness of the approach has been proven by the results achieved in 163 reactor-years of operation. Present and future developments include reviews of current monitoring, testing and inspection methods to ensure that appropriate time variant parameters (capable of revealing aging degradation before loss of functional capability) are monitored, and reviews of the effectiveness of existing maintenance programs and methods in mitigating aging and service wear effects

  12. PWR fuel inspection and repair technology development in the Republic of Korea

    International Nuclear Information System (INIS)

    Park, J.Y.

    1998-01-01

    As of September 1997, 10 PWRs and 2 PHWRs generate 10,320MW electricity in Korea. And another 8 PWRs and 2 PHWRs will be constructed by 2006. These will need about 400 MTU of PWR fuels and 400 MTU of PHWR fuels. To improve average burnup, thermal power, fuel usability and plant safety, better poolside fuel service technologies are strongly recommended as well as the fuel design and fabrication technology improvements. During the last twenty years of nuclear power plant operation in Korea, more than 4,000 fuel assemblies has been used. At the site, continuous coolant activity measurement, pool-side visual inspection and ultrasonic tests have been performed. Some of the fuels are damaged or failed for various reasons. Some of the defected fuels were examined in hot cell to investigate the cause of failure. Even though 30 PWR fuel assemblies were repaired by foreign engineers, fuel inspection and repair technologies are not established yet. Various kind of design for the fuel make the inspection, repair and reconstitution equipment more complex. As a result, recently, a plant to obtain overall technology for poolside fuel inspection, failed fuel repair and reconstitution through R and D activities are set forth. (author)

  13. In-field inspection support software: A status report on the Common Inspection On-site Software Package (CIOSP) project

    International Nuclear Information System (INIS)

    Novatchev, Dimitre; Titov, Pavel; Siradjov, Bakhtiiar; Vlad, Ioan; Xiao Jing

    2001-01-01

    Full text: IAEA has invested much thought and effort into developing software that can assist inspectors during their inspection work. Experience with such applications has been steadily growing and IAEA has recently commissioned a next-generation software package. This kind of software accommodates inspection tasks that can vary substantially in function depending on the type of installation being inspected as well as ensures that the resulting software package has a wide range of usability and can preclude excessive development of plant-specific applications. The Common Inspection On-site Software Package is being developed in the Department of Safeguards to address the limitations of the existing software and to expand its coverage of the inspection process. CIOSP is 'common' in that it is aimed at providing support for as many facilities as possible with the minimum re-configuration. At the same time it has to cater to varying needs of individual facilities, different instrumentation and verification methods used. A component-based approach was taken to successfully tackle the challenges that the development of this software presented. CIOSP consists of the following major components: A framework into which individual plug-ins supporting various inspection activities can integrate at run-time; A central data store containing all facility configuration data and all data collected during inspections; A local data store, which resides on the inspector's computer, where the current inspection's data is stored; A set of services used by all plug-ins (i.e. data transformation, authentication, replication services etc.). This architecture allows for incremental development and extension of the software with plug-ins that support individual inspection activities. The core set of components along with the framework, the Inventory Verification, Book Examination and Records and Reports Comparison plug-ins have been developed. The development of the Short Notice Random

  14. Results of automatic system implementation for Cofrentes power plant detection system LPRM inspection execution

    Energy Technology Data Exchange (ETDEWEB)

    Palomo, M., E-mail: mpalomo@iqn.upv.es [Departamento de Ingenieria Quimica y Nuclear, Universidad Politecnica de Valencia (Spain); Urrea, M., E-mail: matias.urrea@iberdrola.es [C.N.Cofrentes - Iberdrola Generacion S.A., Valencia (Spain); Curiel, M., E-mail: m.curiel@lainsa.com [LAINSA, Grupo Dominguis, Valencia (Brazil); Arnaldos, A., E-mail: a.arnaldos@titaniast.com [TITANIA Servicios Teconologicos, Valencia (Spain)

    2011-07-01

    During this presentation we are going to introduce the results of Cofrentes nuclear power plant automation of the detection system LPRM (Local Power Range Monitor) inspection procedure. An LPRM's test system has been developed and it consists in a software application and data acquisition hardware that performs automatically the complete detection system process: refueling, storage and operation inspection: Ramp voltage generation, measured voltage Plateaux evaluation, qualification report emission; historical analysis to scan burn evolution. The inspections differentiations are developed by the different specifications that it has to fulfil: operation inspection: it is made to check the fission bolt wearing, the detection system functioning and to analyse malfunctioning. From technical specifications and curves analyses it can be determined each LPRM's substitution. Storage inspection: it is made to check the correct functioning and isolation losses before being installed in the core during refueling. Refueling inspection: it is checked that storage LPRM's installation is correct and that they are ready for new fuel cycle. The software application LPRM's Test has been developed by National Instruments LabVIEW, and it performs the following actions: Protocol IEEE-488 (GPIB) control of the source KEITHLEY 237. This source generates the ramp voltage and measure voltage; information acquisition of storage, process and source, identifying LPRM and realization conditions of the same; data analysis and conditions report, historical comparative analysis. (author)

  15. 78 FR 2627 - Fees for Official Inspection and Official Weighing Services Under the United States Grain...

    Science.gov (United States)

    2013-01-14

    ... authority to charge and collect reasonable fees to cover the cost of performing official services. These fees also cover the costs associated with managing the program. After a financial review of GIPSA's Fees for Official Inspection and Weighing Services, including a comparison of the costs and revenues...

  16. Holographic inspection of nuclear plant

    International Nuclear Information System (INIS)

    Gordon, A.L.; Armour, I.A.; Glanville, R.; Malcolm, G.J.; Wright, D.G.

    1988-01-01

    The high resolution, enormous depth of field and high tolerance to radiation of holography mean that it has great potential as an inspection tool in the nuclear industry. In addition, the ability of double-pulse holography to yield detailed information on vibration over the whole field of both large and small structures provides measurements that often cannot be obtained in any other way. This paper reviews the development of equipment for the holographic inspection of nuclear fuel elements; a portable holocamera for use inside reactors; and the application of holographic techniques for vibration measurements in a nuclear power station. (author)

  17. Impact of inservice inspection on the reliability of nuclear piping

    International Nuclear Information System (INIS)

    Woo, H.H.

    1983-12-01

    The reliability of nuclear piping is a function of piping quality as fabricated, service loadings and environments, plus programs of continuing inspection during operation. This report presents the results of a study of the impact of inservice inspection (ISI) programs on the reliability of specific nuclear piping systems that have actually failed in service. Two major factors are considered in the ISI programs: one is the capability of detecting flaws; the other is the frequency of performing ISI. A probabilistic fracture mechanics model issued to estimate the reliability of two nuclear piping lines over the plant life as functions of the ISI programs. Examples chosen for the study are the PWR feedwater steam generator nozzle cracking incident and the BWR recirculation reactor vessel nozzle safe-end cracking incident

  18. Aging and Plant Life Management with the Software Tool COMSY

    International Nuclear Information System (INIS)

    Nopper, Helmut; Rossner, Roland; Zander, Andre

    2006-01-01

    Within the scope of PLEX, a systematic and efficient ageing and plant life management system is becoming more and more important to ensure a safe and economical power plant operation in spite of continuous plant ageing. For the methodical implementation of PLIM and PLEX strategies, AREVA NP has developed the software tool COMSY. This knowledge-based program integrates degradation analysis tools with an inspection data management system. COMSY provides the capability to establish a program guided technical documentation by utilizing a virtual plant model which includes information regarding thermal hydraulic operation, water chemical conditions and materials applied for mechanical components. It provides the option to perform a plant-wide screening for identifying system areas, which are sensitive for degradation mechanisms typically experienced in nuclear power plants (FAC, corrosion fatigue, IGSCC, Pitting, etc.). If a system area is identified as being susceptible to degradation, a detailed analysis function enables the condition-oriented service life evaluation of vessels and piping systems in order to localize and conservatively quantify the effect of degradation. Based on these forecasts with COMSY, specific strategies can be developed to mitigate the effect of degradation and inspection activities can be focused on degradation sensitive areas. In addition, a risk-informed assessment tool serves to optimize inspection activities in respect to degradation potential and the associated damage consequence. After an in-service inspection is performed for a distinct location, the inspection data is to be evaluated according to generally accepted procedures. For this purpose an integrated inspection data management system module provides standardized, interactively operated evaluation functions. The key inspection results are transmitted as feedback in respect to the as-is condition of the component. Subsequently, all further life evaluations of the associated

  19. Inspection and mitigating measures for life extension of nuclear power plant containment structures

    International Nuclear Information System (INIS)

    Meyers, B.L.; Daye, M.A.

    1989-01-01

    The subject of life extension of nuclear power plants has drawn considerable attention during the last few years. Interest in life extension initiated because of both safety and economic reasons. A number of evaluations have been performed. The main thrust of earlier work was directed toward evaluating the factors causing aging, and defining degradation sites, degradation mechanism and failure modes. At present, attention is directed toward establishing the appropriate inspection programs suitable for each of the defined aging sites. Some components and aging sites are already subjected to routine inspection programs such as the surveillance of post-tensioning system and the integrated leak rate test (ILRT) of prestressed concrete and reinforced concrete containments. The aging process affects mechanical, electrical and structural components in all types of containments. This paper addresses the structural components of PWR containments only and presents examples of inspection approaches and describes methods to prevent further degradation of select sites

  20. 7 CFR 351.7 - Regulations governing importation by mail of plant material for immediate export.

    Science.gov (United States)

    2010-01-01

    ... (Continued) ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE IMPORTATION OF PLANTS OR... enter the commerce of the United States. (3) After inspection by the customs and quarantine officers... parcel under customs supervision; affix to the parcel the necessary postage, and comply with other...

  1. Qualification of Manual Phased Array Ultrasonic Techniques for Pipe Weld Inspection in Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Poirier, J.; Hayes, P.; Vicat, F. [GE Inspection Technologies (United States)

    2011-07-01

    Phasor XS can be used for piping weld inspection in any facilities that use EPRI procedures (example: nuclear power plant in Usa, Japan, ...). Whole pipe range is inspected with 5 probes and 6 wedges: 4 1-dimensional probe for sound wave scanning (different frequency, different apertures); 1 dual matrix probe for LW scanning; there are 3 types of wedges optimized for weld inspection. Weld is scanned in 'Raster Scan', maximum range from 35 up to 80 degrees. Probe selection is defined in the procedure according to pipe diameter, pipe thickness and type of access (single or dual side). We have to note that datasets for dual matrix probe are provided with the procedure because this kind of probe cannot be programmed inside Phasor XS

  2. 7 CFR 354.4 - User fees for certain domestic services.

    Science.gov (United States)

    2010-01-01

    ... Directors, USDA, APHIS, Plant Protection and Quarantine and the States for which they are responsible, may be obtained from the Animal and Plant Health Inspection Service, Plant Protection and Quarantine... their agents, must contact the Regional Director, USDA, APHIS, Plant Protection and Quarantine, 5 for...

  3. 78 FR 23312 - Uranium Enrichment Fuel Cycle Inspection Reports Regarding Louisiana Energy Services, National...

    Science.gov (United States)

    2013-04-18

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 70-3103; NRC-2010-0264] Uranium Enrichment Fuel Cycle Inspection Reports Regarding Louisiana Energy Services, National Enrichment Facility, Eunice, New Mexico..., National Enrichment Facility in Eunice, New Mexico, and has authorized the introduction of uranium...

  4. A Study of Automation for Examination Analysis of Inservice Inspection for Nuclear Power Plant (I)

    International Nuclear Information System (INIS)

    Kim, W.

    1985-01-01

    The developing country, KOREA where does not possess the natural resources for traditional energy such as oil and gas, so. The nuclear energy is the most single reliable source available for closing the energy gap. For these reason, It is inavoidable to construct the nuclear power plant and to develop technology related nuclear energy. The rate of operation in large nuclear power facilities depends upon the performance of work system through design and construction, and also the applied technology. Especially, it is the most important element that safety and reliability in operation of nuclear power plant. In view of this aspects, Nuclear power plant is performed severe examinations during perceives and inservice inspection. This study provide an automation of analysis for volumetric examination which is required to nuclear power plant components. It is composed as follows: I. Introduction II. Inservice Inspection of Nuclear Power Plant * General Requirement. * Principle and Methods of Ultrasonic Test. * Study of Flaw Evaluation and Design of Classifying Formula for Flaws. III. Design of Automation for Flaw Evaluation. IV. An Example V. Conclusion In this theory, It is classifying the flaws, the formula of classifying flaws and the design of automation that is the main important point. As motioned the above, Owing to such as automatic design, more time could be allocated to practical test than that of evaluation of defects, Protecting against subjective bias tester by himself and miscalculation by dint of various process of computation. For the more, adopting this method would be used to more retaining for many test data and comparative evaluating during successive inspection intervals. Inspire of limitation for testing method and required application to test components, it provide useful application to flow evaluation for volumetric examination. Owing to the characteristics of nuclear power plant that is highly skill intensive industry and has huge system, the

  5. Some advanced concepts of mobile robotics for plant inspection and maintenance

    International Nuclear Information System (INIS)

    Halme, A.

    1994-01-01

    The paper introduces two concepts in robotics the feasibility of which are presently being studied for plant inspection/maintenance purposes. One of them is a walking machine platform which utilizes walking on discrete set of points making it possible to feed energy trough legs and/or grip on fixing points when needing strong support or climbing on walls. The other is a robot society concept in which the work is distributed among the member robots of the society. The society has an inner communication system trough which information is spread between the members. The control system of the society takes care of the task coordination and communication between the society and the user. As a special feature energy distribution within the society is considered. The concept is suggested for inspection and cleaning type of work in process equipment area and also inside processes in some cases. (author)

  6. Application of neutron radiation inspection at the Pantex Plant

    International Nuclear Information System (INIS)

    Cassidy, J.P.

    1983-01-01

    A neutron radiographic capability has been established at the Pantex Plant in Amarillo, Texas, which is operated for the Department of Energy by Mason and Hanger-Silas Mason Co. A 3 MeV Van de Graaf accelerator is employed as the neutron source. Neutron radiation inspection techniques have been developed to detect and observe discontinuities in explosive materials encased in aluminum, lead, steel and combinations of these casement materials. These data demonstrate that the capability exists for obtaining satisfactory neutron radiographs of many explosive-loaded components. Additional work will be performed in order to further determine applicable capabilities of the 3 MeV Van de Graaf accelerator. (Auth.)

  7. After-installation service, a contribution to enhanced economic efficiency of reactors

    International Nuclear Information System (INIS)

    Bilger, H.

    1996-01-01

    After-installation service agreements are concluded in general for the following plant systems or tasks: power operation, inspection and repair during outages, plant enhancements (retrofitting), instrumentation and control (software). The paper gives various examples selected from power plant practice in Germany, showing that service contracts are a major factor contributing to maintaining economic efficiency, or enhancing it. Examples of nuclear power plant management abroad relying on service contracts are also given (USA, France, Japan). (orig./HP) [de

  8. 9 CFR 352.3 - Application by official exotic animal establishment for inspection services.

    Science.gov (United States)

    2010-01-01

    .... (a) Any person desiring to process an exotic animal, exotic animal carcasses, exotic animal meat and... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Application by official exotic animal establishment for inspection services. 352.3 Section 352.3 Animals and Animal Products FOOD SAFETY AND...

  9. Feasibility of developing risk-based rankings of pressure boundary systems for inservice inspection

    Energy Technology Data Exchange (ETDEWEB)

    Vo, T.V.; Smith, B.W.; Simonen, F.A.; Gore, B.F.

    1994-08-01

    The goals of the Evaluation and Improvement of Non-destructive Examination Reliability for the In-service Inspection of Light Water Reactors Program sponsored by the Nuclear Regulatory Commission at Pacific Northwest Laboratory (PNL) are to (1) assess current ISI techniques and requirements for all pressure boundary systems and components, (2) determine if improvements to the requirements are needed, and (3) if necessary, develop recommendations for revising the applicable ASME Codes and regulatory requirements. In evaluating approaches that could be used to provide a technical basis for improved inservice inspection plans, PNL has developed and applied a method that uses results of probabilistic risk assessment (PRA) to establish piping system ISI requirements. In the PNL program, the feasibility of generic ISI requirements is being addressed in two phases. Phase I involves identifying and prioritizing the systems most relevant to plant safety. The results of these evaluations will be later consolidated into requirements for comprehensive inservice inspection of nuclear power plant components that will be developed in Phase II. This report presents Phase I evaluations for eight selected plants and attempts to compare these PRA-based inspection priorities with current ASME Section XI requirements for Class 1, 2 and 3 systems. These results show that there are generic insights that can be extrapolated from the selected plants to specific classes of light water reactors.

  10. Feasibility of developing risk-based rankings of pressure boundary systems for inservice inspection

    International Nuclear Information System (INIS)

    Vo, T.V.; Smith, B.W.; Simonen, F.A.; Gore, B.F.

    1994-08-01

    The goals of the Evaluation and Improvement of Non-destructive Examination Reliability for the In-service Inspection of Light Water Reactors Program sponsored by the Nuclear Regulatory Commission at Pacific Northwest Laboratory (PNL) are to (1) assess current ISI techniques and requirements for all pressure boundary systems and components, (2) determine if improvements to the requirements are needed, and (3) if necessary, develop recommendations for revising the applicable ASME Codes and regulatory requirements. In evaluating approaches that could be used to provide a technical basis for improved inservice inspection plans, PNL has developed and applied a method that uses results of probabilistic risk assessment (PRA) to establish piping system ISI requirements. In the PNL program, the feasibility of generic ISI requirements is being addressed in two phases. Phase I involves identifying and prioritizing the systems most relevant to plant safety. The results of these evaluations will be later consolidated into requirements for comprehensive inservice inspection of nuclear power plant components that will be developed in Phase II. This report presents Phase I evaluations for eight selected plants and attempts to compare these PRA-based inspection priorities with current ASME Section XI requirements for Class 1, 2 and 3 systems. These results show that there are generic insights that can be extrapolated from the selected plants to specific classes of light water reactors

  11. Do OSHA Inspections Reduce Injuries? A Panel Analysis

    OpenAIRE

    Wayne B. Gray; John T. Scholz

    1991-01-01

    Using data on injuries and OSHA inspections for 6,842 large manufacturing plants between 1979 and 1985, we find evidence that OSHA inspections significantly reduce injuries. This effect comes exclusively from inspections that impose penalties, inspections which do not impose penalties appear to have no effect on injuries. Plants which are inspected (and penalized) in a given year experience a 22 percent decline in their injuries during the following few years. In our sample, total OSHA enforc...

  12. Operation aid device upon periodical inspection of nuclear power plant

    International Nuclear Information System (INIS)

    Fukusaka, Ryoji.

    1997-01-01

    The present invention provides an operation aid device upon periodical inspection of a nuclear power plant, capable of controlling a plurality of control rods safely at good operation efficiency while maintaining subcritical state. Namely, a fuel exchange computer controls an operation for exchanging fuel assemblies upon periodical inspection. An operation aiding computer aids the exchanging operation of fuel assemblies. A control rod position monitoring device allows withdrawal of one control rod under the condition of establishment of entire control rod insertion signal upon operation of exchanging fuel assemblies. Whether all of the four fuel assemblies around one control rod have been entirely taken out or not is judged based on information on the fuel assembly exchanging operation. When conditions for the judgement for operation aiding computer are established, the all insertion signals for the entire control rods as the condition for the withdrawal of the control rods are bypassed, and operation enable signals for plurality control rods are outputted to a control rod manual operation device. (I.S.)

  13. The report of inspection and repair technology of sodium cooled reactors

    International Nuclear Information System (INIS)

    Kisohara, Naoyuki; Uchita, Masato; Konomura, Mamoru

    2002-12-01

    Sodium is the most promising candidate of an FBR coolant because of its excellent properties such as high thermal conductivity. Whereas, sodium reacts with water/air and its opaqueness makes it difficult to inspect sodium components. These weaknesses of sodium affect not only plant safety but also plant availability (economy). To overcome these sodium weak points, the appropriate countermeasure must be adopted to commercialized FBR plants. This report describes the working group activities for sodium/water reaction of steam generators (SG), in-service inspection for sodium components and sodium leak due to sodium components boundary failure. The prospect of each countermeasure is discussed in the viewpoint of the commercialized FBR plants. 1) Sodium/water reaction. The principle of the countermeasure for sodium/water reaction accidents was organized in the viewpoint of economy (the investment of SG and the plant availability). The countermeasures to restrain failure propagation were investigated for a large-sized SG. Preliminary analysis revealed the possibility of minimizing tubes failure propagation by improving the leak detection system and the blow down system. Detailed failure propagation analysis will be required and the early water leak detection system and rapid blow system must be evaluated to realize its performance. 2) In-service inspection (ISI and R). The viewpoint of the commercialized plant's ISI and R was organized by comparing with the prototype reactor's ISI and R method. We also investigated short-term ISI and R method without sodium draining to prevent the degrading of the plant availability, however, it is difficult to realize the with the present technology. Hereafter, the ISI and R of the commercialized plants must be defined by considering its characteristics. 3) Sodium leak from the components. This report organized the basic countermeasure policy for primary and secondary sodium leak accidents. Double-wall structure of sodium piping was

  14. Activities for turbine maintenance: planning, implementation and evaluation of inspection results

    International Nuclear Information System (INIS)

    Azcue, J.; Sanchez, M. A.; Alvaro, M.

    2014-01-01

    The article will cover the most significant aspects of how Tecnatom carry out the turbine maintenance work, both from the point of view of the inspection itself as the pre-and post tasks associated. Thus, the issues that will be part of the article are the Manual Inspection Service (MISI) and the inspection database, ISI WEB. These tools are essential for planning field work and serve as a guide to run later turbine inspections in different plants. Following this introduction the inspection teams and the techniques used by Tecnatom will be described. finally, the article will contain a small mention about management studies of life and integrity analysis of the turbine that can be performed, as well as involvement in its safe operation that is derived from them. Ultimately, the intention is to provide a comprehensive approach to the issue in question, the turbine maintenance work, so that the reader can get an ideal of the whole process. (Author)

  15. Generic safety insights for inspection of boiling water reactors

    International Nuclear Information System (INIS)

    Higgins, J.C.; Taylor, J.H.; Fresco, A.N.; Hillman, B.M.

    1987-01-01

    As the number of operating nuclear power plants (NPP) increases, safety inspection has increased in importance. However, precisely what is important, and what is not important? What should one focus inspection efforts on. Over the last two years Probabilistic Risk Assessment (PR) techniques have been developed to aid in the inspection process. Broad interest in generic PRA-based methods has arisen in the past year, since only about 25% of the US nuclear power plants have completed PRAs, and also, inspectors want PRA-based tools for these plants. This paper describes the BNL program to develop generic BWR PRA-based inspection insights or inspection guidance designed to be applied to plants without PRAs

  16. R and D in support of CANDU plant life management

    International Nuclear Information System (INIS)

    Tapping, R.L.; Holt, R.A.

    1999-01-01

    One of the keys to the long-term success of CANDUs is a high capacity factor over the station design life. Considerable R and D in underway at AECL to develop technologies for assessing, monitoring and mitigating the effect of plant ageing and for improving plant performance and extending plant life. To achieve longer service life and to realize high capacity factor from CANDU stations, AECL is developing new technologies to enhance fuel channel and steam generator inspection capabilities, to monitor system health, and to allow preventive maintenance and cleaning (e.g., on-line chemical cleaning processes that produce small volumes of wastes). The life management strategy for fuel channels and steam generators requires a program to inspect components on a routine basis to identify mechanisms that could potentially affect fitness-for-service. In the case of fuel channels, the strategy includes inspections for dimensional changes, flaw detection, and deuterium concentration. New techniques are been developed to enhance these inspection capabilities; examples include accurate measurement of the gap between a pressure tube and its calandria tube and rapid full-length inspections of steam generator tubes for all known flaw types. Central to life management of components are Fitness-for-Service Guidelines (FFSG) that have been developed with the CANDU Owners Group (COG) that provide a standardized method to assess the potential for propagation of flaws detected during in-service inspections, and assessment of any change in fracture characteristics of the material. FFSG continue to be improved with the development of new technologies such as the capability to credit relaxation of stresses due to creep and non-rejectable flaws in pressure tubes. Effective management of plant systems throughout their lifetime requires much more than data acquisition and display - it requires that system health is continually monitored and managed. AECL has developed a system Health Monitor

  17. In-service inspection of ET-RR-1 reactor vessels and spent fuel storage tank

    International Nuclear Information System (INIS)

    Khattab, M.; Shafy, M.; Konoplev, K.; Samodurve, YU.; Orlov, S.; Didenko, V.; Jackorev, O.

    1993-01-01

    Technical survey included in-service inspection are needed in order to investigate the structural integrity and to insure safe operation of the ET-R R-1 reactor after thirty years aging. An intensive work for the inspection of the inspection of the central tank, shield tank, horizontal channels, primary coolant circuit and spent fuel storage tank have been carried out. The inspection procedures were visual method using video camera and magnification optical as well as thickness measurements using ultrasonic gauge meter and replica for determining defect depth. Water chemical analysis of the primary cooling circuit and spent fuel storage were helpful in results explanation. The results showed that the reactor vessels have good surface conditions. The observed pitting did not affect the structural integrity. The majority of the defects were pits having maximum surface area of about 50 mm. Their depth does not exceed 2 mm. The pits depth rate penetration is of the order of 0.5% per year. Thickness measurements showed insignificant variation. Water status and its chemical properties are very important in controlling corrosion rate. 18 figs., 14 tabs

  18. Research on the Application of Risk-based Inspection for the Boiler System in Power Plant

    Science.gov (United States)

    Li, Henan

    2017-12-01

    Power plant boiler is one of the three main equipment of coal-fired power plants, is very tall to the requirement of the safe and stable operation, in a significant role in the whole system of thermal power generation, a risk-based inspection is a kind of pursuit of security and economy of unified system management idea and method, can effectively evaluate equipment risk and reduce the operational cost.

  19. Inspection planning

    International Nuclear Information System (INIS)

    Korosec, D.; Levstek, M.F.

    2001-01-01

    Slovenian Nuclear Safety Administration (SNSA) division of nuclear and radiological safety inspection has developed systematic approach to their inspections. To be efficient in their efforts regarding regular and other types of inspections, in past years, the inspection plan has been developed. It is yearly based and organized on a such systematic way, that all areas of nuclear safety important activities of the licensee are covered. The inspection plan assures appropriate preparation for conducting the inspections, allows the overview of the progress regarding the areas to be covered during the year. Depending on the licensee activities and nature of facility (nuclear power plant, research reactor, radioactive waste storage, others), the plan has different levels of intensity of inspections and also their frequency. One of the basic approaches of the plan is to cover all nuclear and radiological important activities on such way, that all regulatory requests are fulfilled. In addition, the inspection plan is a good tool to improve inspection effectiveness based on previous experience and allows to have the oversight of the current status of fulfillment of planned inspections. Future improvement of the plan is necessary in the light of newest achievements on this field in the nuclear world, that means, new types of inspections are planned and will be incorporated into plan in next year.(author)

  20. In service inspection of the reactor pressure vessel coolant and moderator nozzles at Atucha 1. 1998/1999 outages

    International Nuclear Information System (INIS)

    Antonaccio, Carlos; Conde, Alberto; Fittipaldi, Andres H.; Maniotti, Jorge; Moliterno, Gabriel E.

    2000-01-01

    During the August 1998 and the August 1999 Atucha 1 outages, two areas were inspected on the Reactor Pressure Vessel: the nozzle inner radii and the nozzle shell welds on all 3 moderator nozzles and all 4 main coolant nozzles. The inspections themselves were carried out by Mitsui Babcock Energy Limited from Scotland. The coordination, maintenance assistant and mounting of the manipulator devices over the nozzles were carried out by NASA personnel. Although it was not the first time the nozzle shell welds were inspected, due to the technologies advances in the ultrasonic field and in the inspection manipulators (magnetic ones), it was possible to inspect more volume than in previous inspections. In the other hand, it was the first time NASA was able to inspect the inner radii. In this last case the mayor problems to inspect them were the nozzles geometry and the small space available to install manipulators. The result of the inspections were: 1) There were no reportable indications at any of the inner radii inspected; 2) The inspection of nozzle to shell welds in main-coolant nozzles R3 and R4 detected flaws (one in each nozzle) which were reported as exceeding the dimensions specified as the acceptance level under Table IWB 3512-1, Section XI of the ASME code. Subsequent analysis requested by NASA and performed by Mitsui Babcock, demonstrated that the flaws were over dimensioned and could be explained as due to 'point' flaws. The analysis was based on theoretical mathematic model and experimental trials. Therefore their dimension were under the acceptance level of the ASME XI code. Although the Mitsui Babcock analysis, and at the same time it was in progress, it was assumed that the flaws were as they were originally presented (exceeding the acceptance level). NASA asked SIEMENS/KWU, the designer of the plant, to perform the fracture assessment according to ASME XI App. A. The assessment shows that the expected crack growth is negligibly small and the safety

  1. Careful determination of inservice inspection of piping by computer analysis in nuclear power plant

    International Nuclear Information System (INIS)

    Lim, H. T.; Lee, S. L.; Lee, J. P.; Kim, B. C.

    1992-01-01

    Stress analysis has been performed using computer program ANSYS in the pressurizer surge line in order to predict possibility of crack generation due to thermal stratification phenomena in pipes connected to reactor coolant system of Nuclear power plants. Highly vulnerable area to crack generation has been chosen by the analysis of fatigue due to thermal stress in pressurizer surge line. This kind of result can be helpful to choose the location requiring intensive care during inservice inspection of nuclear power plants.

  2. The need to optimize inservice testing and inspection to enhance safety

    International Nuclear Information System (INIS)

    Perry, J.A.

    1996-01-01

    Welcome to the Fourth U.S. Nuclear Regulatory Commission and American Society of Mechanical Engineers (USNRC/ASME) Symposium on Valve and Pump Testing in Nuclear Power Plants. This symposium provides a forum to exchange information on technical and regulatory issues associated with the testing of valves and pumps used in nuclear power plants. Progress made since the last symposium will be discussed along with various methods for in service testing of valves and pumps. Active participation by industry representatives, regulators and consultants will entail discussion of a broad array of ideas and points of view regarding how to improve the in service testing of valves and pumps at nuclear power plants. One of the challenges faced is the need to optimize the in service testing and inspection to enhance safety, operability and reliability. The author addresses this challenge from an ASME Nuclear Codes and Standards point of view

  3. The need to optimize inservice testing and inspection to enhance safety

    Energy Technology Data Exchange (ETDEWEB)

    Perry, J.A.

    1996-12-01

    Welcome to the Fourth U.S. Nuclear Regulatory Commission and American Society of Mechanical Engineers (USNRC/ASME) Symposium on Valve and Pump Testing in Nuclear Power Plants. This symposium provides a forum to exchange information on technical and regulatory issues associated with the testing of valves and pumps used in nuclear power plants. Progress made since the last symposium will be discussed along with various methods for in service testing of valves and pumps. Active participation by industry representatives, regulators and consultants will entail discussion of a broad array of ideas and points of view regarding how to improve the in service testing of valves and pumps at nuclear power plants. One of the challenges faced is the need to optimize the in service testing and inspection to enhance safety, operability and reliability. The author addresses this challenge from an ASME Nuclear Codes and Standards point of view.

  4. The PISC programme on defective steam generator tubes inspection summary report

    International Nuclear Information System (INIS)

    Birac, C.; Comby, R.; Maciga, G.; Zanella, G.; Perez Prat, J.; Estorff, U. von

    1995-01-01

    The PISC III Actions are intended to extend the results and methodologies of the previous PISC exercises, i.e. the validation of the capabilities of the various examination techniques when used on real defects in real components under realistic conditions of inspection. The objective of this action is relatively close to that of the heavy structures programmes: the experimental evaluation of the performance of test procedures used for steam generator tubes in nuclear power plants during in-service or pre-service inspections. The exercise is a capability exercise consisting of Round Robin Tests on individual tubes including calibration, training and blind test tubes. In this paper the main conclusions from the RRT conducted in the framework of Action 5 will be presented and discussed. (author). 7 refs, 4 figs, 2 tabs

  5. 7 CFR 330.200 - Movement of plant pests regulated; permits required.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 5 2010-01-01 2010-01-01 false Movement of plant pests regulated; permits required... AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE FEDERAL PLANT PEST REGULATIONS; GENERAL; PLANT PESTS; SOIL, STONE, AND QUARRY PRODUCTS; GARBAGE Movement of Plant Pests § 330.200 Movement of...

  6. Evaluation and improvement in nondestructive examination (NDE) reliability for in-service inspection of light water reactors

    International Nuclear Information System (INIS)

    Deffenbaugh, J.D.; Good, M.S.; Green, E.R.; Heasler, P.G.; Simonen, F.A.; Spanner, J.C.; Taylor, T.T.

    1988-01-01

    The evaluation and improvement of NDE Reliability for In-service Inspection (ISI) of Light Water Reactors (NDE Reliability) Program at Pacific Northwest Laboratory (PNL) was established to determine the reliability of current ISI techniques and to develop recommendations that will ensure a suitably high inspection reliability. The objectives of this NRC program are to: determine the reliability of ultrasonic ISI performed on commercial light-water reactor (LWR) primary systems; determine the impact of NDE unreliability on system safety and determine the level of inspection reliability required to ensure a suitably low failure probability using probabilistic fracture mechanics analysis; evaluate the degree of reliability improvement that could be achieved using improved and advanced NDE technique; and recommend revisions to ASME Code, Section XI, and Regulatory Requirements, based on material properties, service conditions, and NDE uncertainties, that will ensure suitably low failure probabilities. The program consists of three basic tasks: a Piping task, a Pressure Vessel task, and an Evaluation and Improvement in NDE Reliability task. The major efforts were concentrated in the Piping task and the Evaluation and Improvement in NDE Reliability task

  7. The influence of frequency and reliability of in-service inspection on reactor pressure vessel disruptive failure probability

    International Nuclear Information System (INIS)

    Jordan, G.M.

    1977-01-01

    A simple probabilistic methodology is used to investigate the benefit, in terms of reduction of disruptive failure probability, which comes from the application of periodic In Service Inspection (ISI) to nuclear pressure vessels. The analysis indicates the strong interaction between inspection benefit and the intrinsic quality of the structure. In order to quantify the inspection benefit, assumptions are made which allow the quality to be characterized in terms of the parameters governing a Log Normal distribution of time-to-failure. Using these assumptions, it is shown that the overall benefit of ISI is unlikely to exceed an order of magnitude in terms of reduction of disruptive failure probability. The method is extended to evaluate the effect of the periodicity and reliability of the inspection process itself. (author)

  8. Qualification of UT methods and systems used for in-service inspections of VVER 440 vessels

    International Nuclear Information System (INIS)

    Skala, Z.; Vit, J.

    2003-01-01

    SKODA JS has been performing automated in-service inspections VVER reactor pressure vessels for more than twenty years. All of these inspections were performed by ultrasonic pulse echo method, combined from 1996 with eddy current testing. The Time of Flight Diffraction Method (TOFD) is one of modern methods of ultrasonic testing. The accuracy of sizing the through wall extent of a flaw by TOFD is much better than the accuracy achievable by the pulse echo method. A series of laboratory tests were performed by SKODA JS and confirmed the suitability of TOFD method for VVER reactor parts testing. The Czech Atomic law demands the qualification of systems and methods used for the in-service inspections of nuclear reactors. The qualification is done in accordance with ENIQ methodology and consists of preparation of the Technical Justification and practical tests made under the surveillance of Qualification Body. SKODA JS intends to qualify systems and methods used for the automated ultrasonic testing of VVER 440 and VVER 1000 reactor components from the inner as well as from the outer surface. The accuracy of the flaw through wall extent sizing by TOFD was confirmed by the qualification of methods and systems used for the testing of VVER 440 vessel circumferential weld and so the TOFD method shall be used routinely by SKODA JS for the inspection of vessel circumferential welds root area and for sizing of flaws exceeding the acceptance level. (author)

  9. 7 CFR 330.212 - Movement of plant pests by baggage.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 5 2010-01-01 2010-01-01 false Movement of plant pests by baggage. 330.212 Section... INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE FEDERAL PLANT PEST REGULATIONS; GENERAL; PLANT PESTS; SOIL, STONE, AND QUARRY PRODUCTS; GARBAGE Movement of Plant Pests § 330.212 Movement of plant pests by baggage...

  10. Overview of improvements in work practices and instrumentation for CANDU primary heat transport feeders in-service inspections

    Energy Technology Data Exchange (ETDEWEB)

    Marcotte, O., E-mail: olivier@nucleom.ca [Nucleom Inc., Quebec, Quebec (Canada); Rousseau, G., E-mail: rousseau.gilles.a@hydro.qc.ca [Hydro Quebec, Becancour, Quebec (Canada); Rochefort, E., E-mail: erochfort@zetec.com [Zetec Canada, Quebec, Quebec (Canada)

    2013-01-15

    The Canadian nuclear industry has developed many advanced non-destructive inspection techniques to be applied safely in hazardous environments in recent years. Automated systems, manual tooling and specialized software modules have been designed since early 2000s to provide complete and very efficient fitness for service inspection of primary heat transport system carbon steel feeder pipes. These techniques deal with complex geometries, difficult access and, radioactive environment. Complementary NDE techniques, namely Ultrasounds, eddy current, phased-array UT and automated scanners are used. This presentation describes the improvements in inspection practices and the advanced data analysis features. (author)

  11. 9 CFR 590.132 - Access to plants.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Access to plants. 590.132 Section 590... Service § 590.132 Access to plants. Access shall not be refused to any representative of the Secretary to any plant, place of business, or transport vehicle subject to inspection under the provisions of this...

  12. Risk based inspection experience from the European chemical- and petrochemical industries

    International Nuclear Information System (INIS)

    Kristensen, Hans; Jeppesen, Leif; Larsen, Bjarne; Kim, Na Yon

    2001-01-01

    As an inspection vendor with 60 years of experience and with more than 25 years of experience as manufacturer of the Automated Ultrasonic NDT systems, the P-scan systems, FORCE Institute is continuously analysing the market for NDT. This is done to assure that both the equipment product line and the service mix provided by FORCE Institute are meeting the requirements from the industry today and in the future. The concept of Risk Based Inspection Programmes were adopted early by the offshore industry and has in the recent years been adopted by many other industries as a reliable and cost efficient way of maintaining a production facility. A Risk/Reliability Based Inspection Programme is a 'living organism' that constantly needs information if it shall be of any value and NDT information is only one type of information that is required. The NDT information required is normally related to corrosion/base material information and weld integrity information. NDT as an integrated part of a plants maintenance system is, in Europe, currently influenced by the following tendencies which all are related to 'Risk Based Inspection': · Increased use of Base-Line Inspections · Reduction in the use of repeated inspections(qualitative- instead of quantitative Inspections). · Inspection results are fed directly into the plant maintenance system. · Fitness-for-Purpose acceptance criteria instead of conventional acceptance criteria. As repeatability and accuracy is a key issue for the data, automated ultrasonic inspection is increasingly used as an alternative to manual ultrasonic inspection, but due to the physical size of most automated ultrasonic inspection systems the gain in productivity has not been as significant as the gain in repeatability and accuracy. In this paper some of FORCE Institute's practical experiences with examinations carried out in connection with Risk Based Inspection is used to illustrate the above described tendencies. Not only examples using automated

  13. Careful Determination of Inservice Inspection of piping by Computer Analysis in Nuclear Power Plant

    International Nuclear Information System (INIS)

    Lim, H. T.; Lee, S. L.; Lee, J. P.; Kim, B. C.

    1992-01-01

    Stress analysis has been performed using computer program ANSYS in the pressurizer surge line in accordance with ASME Sec. III in order to predict possibility of fatigue failure due to thermal stratification phenomena in pipes connected to reactor coolant system of nuclear power plants. Highly vulnerable area to crack generation has been chosen by the analysis of fatigue due to thermal stress in pressurizer surge line. This kind of result can be helpful to choose the location requiring intensive care during inservice inspection of nuclear power plants

  14. 46 CFR 2.10-101 - Annual vessel inspection fee.

    Science.gov (United States)

    2010-10-01

    ... inspections, damage surveys, repair and modification inspections, change in vessel service inspections, permit... of international certificates. (d) Entitlement to inspection services for the current year remains... MODUs 4,695 Semi-submersible MODUs 8,050 Nautical School Vessels: Length not greater than 100 feet 835...

  15. Development and testing of VTT approach to risk-informed in-service inspection methodology. Final report of SAFIR INTELI INPUT Project RI-ISI

    International Nuclear Information System (INIS)

    Cronvall, O.; Maennistoe, I.; Simola, K.

    2007-04-01

    This report summarises the results of a research project on risk-informed in-service inspection (RI-ISI) methodology conducted in the Finnish national nuclear energy research programme SAFIR (2003-2006). The purpose of this work was to increase the accuracy of risk estimates used in RI-ISI analyses of nuclear power plant (NPP) piping systems, and to quantitatively evaluate the effects of different piping inspection strategies on risk. Piping failure occurrences were sampled by using probabilistic fracture mechanics (PFM) analyses. The PFM results for crack growth were used to construct transition matrices for a discrete-time Markov process model, which in turn was applied to examine the effects of various inspection strategies on the failure probabilities and risks. The applicability of the developed quantitative risk matrix approach was examined as a pilot study performed to the Shut-down cooling piping system 321 in NPP unit OL1 of Teollisuuden Voima Oy (TVO). The analysed degradation mechanisms were stress corrosion cracking (SCC) and thermal fatigue induced cracking (in the mixing points). Here a new and rather straightforward approach was developed to model thermal fatigue induced cracking, which degradation mechanism is much more difficult to model than SCC. This study further demonstrated the usefulness of Markov analysis procedure development by VTT in RI-ISI applications. The most important results are the quantified comparisons of different inspections strategies. It was shown in this study that Markov models are useful for this purpose, when combined with PFM analyses. While the numerical results could benefit from further considerations of inspection reliability, this does not affect the feasibility of the method itself. The approach can be used to identify an optimal inspection strategy for achieving a balanced risk profile of piping segments. (orig.)

  16. 9 CFR 355.40 - Plants to furnish information for reports.

    Science.gov (United States)

    2010-01-01

    ... AND VOLUNTARY INSPECTION AND CERTIFICATION CERTIFIED PRODUCTS FOR DOGS, CATS, AND OTHER CARNIVORA... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Plants to furnish information for reports. 355.40 Section 355.40 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT...

  17. SICOM: On-site inspection systems

    International Nuclear Information System (INIS)

    Serna, J.J.; Quecedo, M.; Fernandez, J.R.

    2002-01-01

    As the irradiation conditions become more demanding for the fuel than in the past, there is a need for surveillance programs to gather in-reactor operating experience. The data obtained in these programs can be used to assess the performance of current fuel designs and the improvements incorporated to the fuel assembly design, the performance of the advanced cladding alloys, etc. In these regards, valuable data is obtained from on-site fuel inspections. These on-site data comprise fuel assembly dimensional data such as length and distortion (tilt, twist and bow) and fuel rod data such as length and oxide thickness. These data have to be reliable and accurate to be useful thus, demanding a high precision inspection equipment. However, the inspection equipment has to be also robust and flexible enough to operate in the plant spent fuel pool and, sometimes, without interfering in the works carried out during a plant outage. To meet these requirements, during the past years ENUSA and TECNATOM have developed two on-site inspection systems. While the first system can perform most of the typical measurements in a stand-alone manner thus, without interfering with the critical path of the reload, the second one reduces the inspection time but requires using the plant capabilities. The paper describes both equipment for fuel on-site inspection, their characteristics and main features. (author)

  18. Advances in steam generator service technology

    International Nuclear Information System (INIS)

    Perez, Ric

    1998-01-01

    The most recent advances in pressurized water reactor steam generator service technology are discussed in this article. Focus is on new developments in robotics, including the Remotely Operated Service Arm (ROSA III); repair and maintenance services on the SG secondary side; and the newest advances in SG inspection. These products and services save utility costs, shorten outage durations, enhance plant performance and safety, and reduce radiation exposure. (author)

  19. Sigma: computer vision in the service of safety and reliability in the inspection services

    International Nuclear Information System (INIS)

    Pineiro, P. J.; Mendez, M.; Garcia, A.; Cabrera, E.; Regidor, J. J.

    2012-01-01

    Vision Computing is growing very fast in the last decade with very efficient tools and algorithms. This allows new development of applications in the nuclear field providing more efficient equipment and tasks: redundant systems, vision-guided mobile robots, automated visual defects recognition, measurement, etc., In this paper Tecnatom describes a detailed example of visual computing application developed to provide secure redundant identification of the thousands of tubes existing in a power plant steam generator. some other on-going or planned visual computing projects by Tecnatom are also introduced. New possibilities of application in the inspection systems for nuclear components appear where the main objective is to maximize their reliability. (Author) 6 refs.

  20. Benchmarking on Inspection Practices. First Triennial Report of the Working Group on Inspection Practices

    International Nuclear Information System (INIS)

    2017-01-01

    The WGIP Nuclear Power Plant (NPP) Observed Inspection Practices Program is intended to promote co-operation and learning among member countries and to collect and provide them with information for improving the effectiveness of existing regulatory inspection practices. This is accomplished by observing how inspections are carried out by other member countries and issuing a WGIP observed inspection report that includes observations (e.g. inspection techniques, obstacles encountered), lessons learnt and potential commendable practices that could be used by a regulatory body. This first triennial report documents the results of a consistency check performed between all six WGIP observed inspection reports and ratifies certain observations, lessons learnt and potential commendable practices identified by WGIP observed inspection participants

  1. Optimal replacement and inspection periods of safety and control boards in Wolsung nuclear power plant unit 1

    International Nuclear Information System (INIS)

    Mok, Jin Il

    1993-02-01

    In nuclear power plants, the safety and control systems are important for operating and maintaining safety of nuclear power plants. Due to the failure of the instrument and control devices of nuclear power plants caused by aging, nuclear power plants occasionally trip. Since the start of first commercial operation of Kori nuclear power plant (NPP) unit 1, the trips caused by instrument and control systems account for 28% of total trips of NPPs in Korea. Even a single trip of a nuclear power plant causes an extravagant economical loss and deteriorates public acceptance of nuclear power plants. Therefore, the replacement of the instrument and control devices with proper consideration of the aging effect is necessary in order to prevent the inadvertent trip. In this work we investigated the optimal replacement periods of the digital control computer's (DCC) and the programmable digital comparator's (PDC) electronic circuit boards of Wolsung nuclear power plant Unit 1. We first derived mathematical models which calculate optimal replacement periods for electronic circuit boards of digital control computer (DCC) and for those of the programmable digital comparator (PDC) in Wolsung NPP unit 1. And we analytically obtained the optimal replacement periods of electronic circuit boards by using these models. We compared these periods with the replacement periods currently used at Wolsung NPP Unit. The periods used at Wolsung is not based on mathematical analysis, but on empirical knowledge. As a consequence, the optimal replacement periods analytically obtained for the electronic circuit boards of DCC and those used in the field shown small difference : the optimal replacement periods analytically obtained for the electronic circuit boards of PDC are shorter than those used in the field in general. The engineered safeguards of Wolsung nuclear power plant unit 1 contains redundant systems of 2-out-of-3 logic which are not operating under normal conditions but they are called

  2. Inspection of fire protection measures and fire fighting capability at nuclear power plants. A publication within the NUSS programme

    International Nuclear Information System (INIS)

    1994-01-01

    The present publication has been developed with the help of experts from regulatory, operating and engineering organizations, all with practical experience in the field of fire protection of nuclear power plants. The publication outlines practices for inspecting the fire protection measures at nuclear power plants in accordance with Safety Series No.50-SG-D2(Rev.1), Fire Protection in Nuclear Power Plants, and includes a comprehensive fire safety inspection checklist of the specific elements to be addressed when evaluating the adequacy and effectiveness of the fire protection measures and manual fire fighting capability available at operating nuclear power plants. The publication will be useful not only to regulators and safety assessors but also to operators and designers. The book addresses a specialized topic and it is recommended that it be used in conjunction with Safety Guide No.50-SG-D2(Rev.1)

  3. Ageing management of nuclear power plant concrete structures - Overview and suggested research topics

    International Nuclear Information System (INIS)

    Naus, J.

    2009-01-01

    Nuclear power plant concrete structures are described and their operating experience noted. Primary considerations related to management of their ageing are noted and an indication of their status provided: degradation mechanisms, damage models, and material performance; assessment and remediation (i.e., component selection, in-service inspection, non-destructive examinations, and remedial actions); and estimation of performance at present or some future point in time (i.e., application of structural reliability theory to the design and optimisation of in-service inspection/maintenance strategies, and determination of the effects of degradation on plant risk). Several activities are identified that provide background information and data on areas of concern with respect to non-destructive examination of nuclear power plant concrete structures: inspection of thick-walled, heavily-reinforced sections; basemat; and inaccessible areas of the containment metallic pressure boundary. Topics are noted where additional research would be of benefit to ageing management of nuclear power plant concrete structures. (author)

  4. Automatic ultrasonic testing and the LOFT in-service inspection program

    International Nuclear Information System (INIS)

    Hunter, J.A.

    1980-01-01

    An automatic ultrasonic testing system has been developed which significantly improves the flaw indication detection and characterization capability over the capability of conventional volumetric examination techniques. The system utilizes an accurately located ultrasonic sensor to generate the examination data. A small computer performs and integrates control and data input/output functions. Computer software has been developed to provide a rigorous method for data analysis and ultrasonic image interpretation. The system has been used as part of an in-service inspection program to examine welds in thich austenitic stainless steel pipes in a small experimental nuclear reactor

  5. Publication of the inspection follow-up letters of the ASN on its site web asn.gouv.fr; Publication des lettres de suite d'inspection de l'ASN sur son site web asn.gouv.fr

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    Since February 2002, the French authority of nuclear safety (ASN) publishes on its web site (http://www.asn.gouv.fr) the letters addressed to the operators of nuclear facilities at the end of its inspections. The ASN carries out about 700 inspections every year which concern the French nuclear facilities, the central services of nuclear operators or of their suppliers, and the transports of nuclear materials. Each inspection is followed by a follow-up letter which mentions all anomalies noticed during the inspection and eventually asks for some remedial actions or for some complements of information. This document brings together the letters published between february and May 2002 and concerning the on-site inspections of nuclear facilities (EdF nuclear power plants, CEA centers, Cogema facilities, other sites) and the off-site inspections (Andra, transports of nuclear materials). (J.S.)

  6. 77 FR 75185 - Endangered and Threatened Wildlife and Plants; Enhancement of Survival Permit Application; Draft...

    Science.gov (United States)

    2012-12-19

    ...-footed ferret was twice considered extinct or nearly extinct before all known wild ferrets were captured.... Fish and Wildlife Service, Animal Plant Health Inspection Service--Wildlife Services, the Natural...

  7. 7 CFR 330.202 - Consideration of applications for permits to move plant pests.

    Science.gov (United States)

    2010-01-01

    ... plant pests. 330.202 Section 330.202 Agriculture Regulations of the Department of Agriculture (Continued) ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE FEDERAL PLANT PEST REGULATIONS; GENERAL; PLANT PESTS; SOIL, STONE, AND QUARRY PRODUCTS; GARBAGE Movement of Plant Pests § 330.202...

  8. Value added services to CANDU plants

    International Nuclear Information System (INIS)

    Kakaria, B.K.

    2003-01-01

    Over the last decade or so, nuclear power plants, just like other types of electricity generating plants, have been facing a number of challenges. Depending on the operating environment of the utility, these challenges are forcing plant owners to examine all facets of the operating costs. Privatization, deregulation and economics of alternative electricity generation methods are exerting enormous pressure on nuclear power plants to streamline costs and improve their operational performance. CANDU reactors are no exception to these forces and face similar pressures. In particular, operating plants that are contemplating plant life extensions are being required to clearly demonstrate the economics of continued operation over other forms of power generation available to the utility. Improvement of capacity factors has the effect of increasing the revenues from the plant and as these revenues increase, the fixed portion of the plant costs including OM and A costs become a smaller percentage of the total revenues. Similar results can be achieved by aiming to reduce the plant OM and A costs. In reality, most well-planned intervention schemes directed at reducing OM and A costs tend to also increase the plant availability. Following plant turnover after commissioning, AECL has been supporting the CANDU owners and utilities with an assortment of products and services dealing with plant operations and outage management issues. AECL has taken the lead in arranging specialized resources, products and services by teaming with other complementary organizations to provide a complete suite of services. Recent examples of such support to operating CANDU plants will be described in the paper. AECL is responding to this changing business environment in two important ways. First, AECL is changing from simply providing a service to its clients towards providing value, something much more important. To this end, AECL is looking to other organizations to form alliances, partnerships and

  9. From PISC to risk informed inspection

    International Nuclear Information System (INIS)

    Crutzen, S.; Lemaitre, P.; Fabbri, L.

    1998-01-01

    In this paper the correlation between inspection effectiveness, inspection qualification and risk informed inspection will be treated in view of harmonisation of inspection of nuclear plant components. Through the different phases of the PISC programme the necessity has been demonstrated to show the effectiveness of the inspection through a formal process of qualification in order to ensure that a certain level of effectiveness has been reached. Inspection qualification is indeed the way to quantify the capability level of inspection techniques used. The targets to be met by the inspection is information which should be obtained from risk based analyses. (author)

  10. 7 CFR 330.201 - Applications for permits to move plant pests.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 5 2010-01-01 2010-01-01 false Applications for permits to move plant pests. 330.201... HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE FEDERAL PLANT PEST REGULATIONS; GENERAL; PLANT PESTS; SOIL, STONE, AND QUARRY PRODUCTS; GARBAGE Movement of Plant Pests § 330.201 Applications for permits to...

  11. 7 CFR 330.211 - Labeling of plant pests for movement under permits.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 5 2010-01-01 2010-01-01 false Labeling of plant pests for movement under permits... AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE FEDERAL PLANT PEST REGULATIONS; GENERAL; PLANT PESTS; SOIL, STONE, AND QUARRY PRODUCTS; GARBAGE Movement of Plant Pests § 330.211 Labeling of...

  12. 7 CFR 330.205 - Disposal of plant pests when permits are canceled.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 5 2010-01-01 2010-01-01 false Disposal of plant pests when permits are canceled. 330... PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE FEDERAL PLANT PEST REGULATIONS; GENERAL; PLANT PESTS; SOIL, STONE, AND QUARRY PRODUCTS; GARBAGE Movement of Plant Pests § 330.205 Disposal of...

  13. Effect of a Publicly Accessible Disclosure System on Food Safety Inspection Scores in Retail and Food Service Establishments.

    Science.gov (United States)

    Choi, Jihee; Scharff, Robert L

    2017-07-01

    The increased frequency with which people are dining out coupled with an increase in the publicity of foodborne disease outbreaks has led the public to an increased awareness of food safety issues associated with food service establishments. To accommodate consumer needs, local health departments have increasingly publicized food establishments' health inspection scores. The objective of this study was to estimate the effect of the color-coded inspection score disclosure system in place since 2006 in Columbus, OH, by controlling for several confounding factors. This study incorporated cross-sectional time series data from food safety inspections performed from the Columbus Public Health Department. An ordinary least squares regression was used to assess the effect of the new inspection regime. The introduction of the new color-coded food safety inspection disclosure system increased inspection scores for all types of establishments and for most types of inspections, although significant differences were found in the degree of improvement. Overall, scores increased significantly by 1.14 points (of 100 possible). An exception to the positive results was found for inspections in response to foodborne disease complaints. Scores for these inspections declined significantly by 10.2 points. These results should be useful for both food safety researchers and public health decision makers.

  14. Plant functional traits predict green roof ecosystem services.

    Science.gov (United States)

    Lundholm, Jeremy; Tran, Stephanie; Gebert, Luke

    2015-02-17

    Plants make important contributions to the services provided by engineered ecosystems such as green roofs. Ecologists use plant species traits as generic predictors of geographical distribution, interactions with other species, and ecosystem functioning, but this approach has been little used to optimize engineered ecosystems. Four plant species traits (height, individual leaf area, specific leaf area, and leaf dry matter content) were evaluated as predictors of ecosystem properties and services in a modular green roof system planted with 21 species. Six indicators of ecosystem services, incorporating thermal, hydrological, water quality, and carbon sequestration functions, were predicted by the four plant traits directly or indirectly via their effects on aggregate ecosystem properties, including canopy density and albedo. Species average height and specific leaf area were the most useful traits, predicting several services via effects on canopy density or growth rate. This study demonstrates that easily measured plant traits can be used to select species to optimize green roof performance across multiple key services.

  15. Structural inspection and wind analysis of redwood cooling towers at the Portsmouth Gaseous Diffusion Plant

    International Nuclear Information System (INIS)

    Chung, T.; Solack, T.; Hortel, J.

    1991-01-01

    As part of the plant upgrade program, structural analyses and field inspections were performed on four redwood cooling towers at the DOE Portsmouth gaseous diffusion plant located in Piketon, Ohio. The cooling towers are categorized as important hazard facilities. The loadings are derived from UCRL-15910 according to the pertinent hazard category. In addition to the seismic and wind loadings, the wood cooling towers are constantly subject to adverse environmental effects such as elevated temperature, chemical attack, icing and snow load, and motor vibrations. A thorough structural evaluation for all load combinations was performed for each of the cooling towers based on the structural code requirements of the Cooling Tower Institute and National Forest Products Association. Most stress criteria are unique for the redwood material. This evaluation was performed using finite element techniques on the global structural integrity and supplemented by hand calculations on the individual connection joints. Overloaded wood structural members and joints are identified by the analysis. The rectangular tower structure sits on a concrete basin that span across 60 ft by 200 ft. A major part of the cooling towers upgrading program involved field inspections of the individual cells of each tower. The primary purpose of these inspections was to identify any existing structural damage or deficiencies such as failed members, degraded wood, and deficiencies resulting from poor construction practice. Inspection of 40 cells identified some generic deficiencies that mostly are consistent with the analytical finding. Based on the analysis, some effective but inexpensive upgrading techniques were developed and recommended to bring the cooling towers into compliance with current DOE requirements

  16. 7 CFR 927.60 - Inspection and certification.

    Science.gov (United States)

    2010-01-01

    ... WASHINGTON Order Regulating Handling Inspection § 927.60 Inspection and certification. (a) Handlers shall ship only fresh pears inspected by the Federal-State Inspection Service or under a program developed by... 7 Agriculture 8 2010-01-01 2010-01-01 false Inspection and certification. 927.60 Section 927.60...

  17. Bivalve fouling of nuclear power plant service-water systems. Volume 2. Current status of biofouling surveillance and control techniques

    International Nuclear Information System (INIS)

    Daling, P.M.; Johnson, K.I.

    1985-03-01

    This report describes the current status of techniques for detection and control of cooling-water system fouling by bivalve mollusks at nuclear power plants. The effectiveness of these techniques is evaluated on the basis of information gathered from a literature review and in interviews with nuclear power plant personnel. Biofouling detection techniques examined in this report include regular maintenance, in-service inspection, and testing. Generally, these methods have been inadequate for detecting biofouling. Recommendations for improving biofouling detection capabilities are presented. Biofouling prevention (or control) methods that are examined in this report include intake screen systems, thermal treatment, preventive maintenance, chemical treatment alternatives, and antifoulant coatings. Recommendations for improving biofouling control methods at operating nuclear power plants are presented. Additional techniques that could be implemented at future power plants or that require further research are also described

  18. Health products inspection

    International Nuclear Information System (INIS)

    Stoltz, M.

    2009-01-01

    To protect public health, the Health Products Inspection is a public service mission where the application of regulations concerning activities on human health products and cosmetic products is verified. This mission permits a global approach to assess the health products risk-based benefit and, in monitoring by laboratory testing and by on site inspections, to verify their compliance with appropriate regulations. The seventy five inspectors perform about eight hundred inspections per year, in France and abroad. These inspections are related to data provided in the health products assessment and also to manufacturing and delivery practices. The French inspection body is also involved in the training of foreign inspectors and in the harmonization of national, European and international practices either for operators than for the competent authorities. (author)

  19. Operation of inspection data acquisition and evaluation system

    International Nuclear Information System (INIS)

    Takahashi, Yoichi; Harada, Hiroshi; Watanabe, Masayuki; Sakaguchi, Makoto; Ishikawa, Masayuki

    2016-01-01

    Rokkasho Reprocessing Plant (RRP) is a large scale plant to treat a huge amount of Plutonium significant for safeguards. The LArge SCAle Reprocessing plant safeguards (LASCAR) Forum recommended an effective utilization of unattended verification systems and automated data acquisition system etc. Based on LASCAR recommendation, Nuclear Material Control Center (NMCC) has developed the inspection data acquisition system as the automated data acquisition system from the unattended verification systems (including non-destructive assay equipment, solution monitoring system and surveillance camera). The data gathered from the unattended verification system are provided to the inspection data evaluation system for the State and the IAEA. In this development, redundancy concepts for data transfer line, in order to prevent inspection data missing, were introduced, and the timely confirmation of solution behaver such as material flows and inventories by the solution monitoring can be achieved. Furthermore, for purpose of efficiency of evaluation of inspection activity for the State, NMCC has developed the inspection data evaluation system which operates automated partition of inspection data coming from each verification equipment. Additionally, the inspection data system evaluation can manage the inspection activities and their efforts. These development and operation have been funded by JSGO (Japan Safeguards Office). This paper describes development history and operation of the inspection data acquisition and evaluation system. (author)

  20. Experience with ANSI N14.30 for in-service inspections of semi-trailer used for spent fuel shipments

    International Nuclear Information System (INIS)

    Hirtz, G.J.

    1998-05-01

    On July 18, 1996, the Oak Ridge National Laboratory (ORNL) resumed shipping spent fuel in interstate commerce after a 10 year suspension of this activity. This shipment was conducted using a Nuclear Regulatory Commission licensed spent fuel transport package purchased from General Electric Company by ORNL for the purpose of moving High Flux Isotope Reactor spent fuel to the Savannah River Site. The trailer, fabricated to the ANSI N14.30, Semi-Trailers Employed in the Highway Transport of Weight Concentrated Radioactive Loads Design, Fabrication, and Maintenance, has recently undergone its first scheduled in-service inspection. This paper presents the experience gained from interpretation and application of the ANSI N14.30 standard focusing on the in-service inspection for the structure of the trailer. Initially, the term weight concentrated is illustrated giving detail to the location and center of gravity of the 33,500 pound shipping container and forces induced by the tie down system. Basic information about the design stresses and initial testing provided by the manufacturer are used as a lead-in to the requirements of the standard. The task of examining the trailer structure provided many lessons and required considerable effort. All of the support personnel were provided by ORNL; the garage mechanics and the certified inspection engineers had never been involved in applying ANSI N14.30. Other obstacles were the lack of existing inspection procedures for this particular activity and the lack of a previous experience interpreting the standard with regard to repair work. Some of these questions were resolved by clarification received from the writers of the standard, and others were resolved by the teamwork between the manufacturer and ORNL. This experience illustrated the importance of the trailer manufacturer as a participant in the decisions made concerning in-service inspection and maintenance

  1. Risk-based inspection--Development of guidelines

    International Nuclear Information System (INIS)

    1993-07-01

    Effective inservice inspection programs can play a significant role in minimizing equipment and structural failures. Most of the current inservice inspection programs for light water reactor (LWR) nuclear power plant components are based on experience and engineers' qualitative judgment. These programs include only an implicit consideration of risk, which combines the probability of failure of a component under its operation and loading conditions and the consequences of such failure, if it occurs. This document recommends appropriate methods for establishing a risk-based inspection program for LWR nuclear power plant components. The process has been built from a general methodology (Volume 1) and has been expanded to involve five major steps: defining the system; evaluating qualitative risk assessment results; using this and information from plant probabilistic risk assessments to perform a quantitative risk analysis; selecting target failure probabilities; and developing an inspection program for components using economic decision analysis and structural reliability assessment methods

  2. 9 CFR 381.309 - Finished product inspection.

    Science.gov (United States)

    2010-01-01

    ... Section 381.309 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE AGENCY ORGANIZATION AND TERMINOLOGY; MANDATORY MEAT AND POULTRY PRODUCTS INSPECTION AND VOLUNTARY INSPECTION AND CERTIFICATION POULTRY PRODUCTS INSPECTION REGULATIONS Canning and Canned Products § 381.309...

  3. Study of a risk-based piping inspection guideline system.

    Science.gov (United States)

    Tien, Shiaw-Wen; Hwang, Wen-Tsung; Tsai, Chih-Hung

    2007-02-01

    A risk-based inspection system and a piping inspection guideline model were developed in this study. The research procedure consists of two parts--the building of a risk-based inspection model for piping and the construction of a risk-based piping inspection guideline model. Field visits at the plant were conducted to develop the risk-based inspection and strategic analysis system. A knowledge-based model had been built in accordance with international standards and local government regulations, and the rational unified process was applied for reducing the discrepancy in the development of the models. The models had been designed to analyze damage factors, damage models, and potential damage positions of piping in the petrochemical plants. The purpose of this study was to provide inspection-related personnel with the optimal planning tools for piping inspections, hence, to enable effective predictions of potential piping risks and to enhance the better degree of safety in plant operations that the petrochemical industries can be expected to achieve. A risk analysis was conducted on the piping system of a petrochemical plant. The outcome indicated that most of the risks resulted from a small number of pipelines.

  4. 9 CFR 156.3 - Kind of service; records.

    Science.gov (United States)

    2010-01-01

    ... the products intended for certification. The inspector shall keep such records of the temperatures... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Kind of service; records. 156.3 Section 156.3 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF...

  5. Eddy current technology for heat exchanger and steam generator tube inspection

    Energy Technology Data Exchange (ETDEWEB)

    Obrutsky, L.; Lepine, B.; Lu, J.; Cassidy, R.; Carter, J. [Atomic Energy of Canada Limited, Chalk River, Ontario (Canada)

    2004-07-01

    A variety of degradation modes can affect the integrity of both heat exchanger (HX) and balance of plant tubing, resulting in expensive repairs, tube plugging or replacement of tube bundles. One key component for ensuring tube integrity is inspection and monitoring for detection and characterization of the degradation. In-service inspection of HX and balance of plant tubing is usually carried out using eddy current (EC) bobbin coils, which are adequate for the detection of volumetric degradations. However, detection and quantification of additional modes of degradation such as pitting, intergranular attack (IGA), axial cracking and circumferential cracking require specialized probes. The need for timely, reliable detection and characterization of these modes of degradation is especially critical in Nuclear Generating Stations. Transmit-receive single-pass array probes, developed by AECL, offer high defect detectability in conjunction with fast and reliable inspection capabilities. They have strong directional properties, permitting probe optimization for circumferential or axial crack detection. Compared to impedance probes, they offer improved performance in the presence of variable lift-off. This EC technology can help resolve critical detection issues at susceptible areas, such as the rolled-joint transitions at the tubesheet, U-bends and tube-support intersections. This paper provides an overview of the operating principles and the capabilities of advanced ET inspection technology available for HX tube inspection. Examples of recent application of this technology in Nuclear Generating Stations (NGSs) are discussed. (author)

  6. Eddy current technology for heat exchanger and steam generator tube inspection

    International Nuclear Information System (INIS)

    Obrutsky, L.; Lepine, B.; Lu, J.; Cassidy, R.; Carter, J.

    2004-01-01

    A variety of degradation modes can affect the integrity of both heat exchanger (HX) and balance of plant tubing, resulting in expensive repairs, tube plugging or replacement of tube bundles. One key component for ensuring tube integrity is inspection and monitoring for detection and characterization of the degradation. In-service inspection of HX and balance of plant tubing is usually carried out using eddy current (EC) bobbin coils, which are adequate for the detection of volumetric degradations. However, detection and quantification of additional modes of degradation such as pitting, intergranular attack (IGA), axial cracking and circumferential cracking require specialized probes. The need for timely, reliable detection and characterization of these modes of degradation is especially critical in Nuclear Generating Stations. Transmit-receive single-pass array probes, developed by AECL, offer high defect detectability in conjunction with fast and reliable inspection capabilities. They have strong directional properties, permitting probe optimization for circumferential or axial crack detection. Compared to impedance probes, they offer improved performance in the presence of variable lift-off. This EC technology can help resolve critical detection issues at susceptible areas, such as the rolled-joint transitions at the tubesheet, U-bends and tube-support intersections. This paper provides an overview of the operating principles and the capabilities of advanced ET inspection technology available for HX tube inspection. Examples of recent application of this technology in Nuclear Generating Stations (NGSs) are discussed. (author)

  7. Surveillance - filling the gap between audits and inspection

    International Nuclear Information System (INIS)

    Coulombe, C.T.

    1987-01-01

    Historically, two major verification activities are accomplished at nuclear plants: audits and inspections. Both have their roots firmly planted in regulation. They are required elements of a quality assurance (QA) program. Inspection, focused on hardware, verifies that equipment meets its specified requirements. Auditing, focused on documentation, verifies, through objective evidence, that the QA program is being effectively implemented. Quality surveillance, focused on performance, verifies effective use of the plant's procedures and quality program. The surveillance concept provides a method to assure that the gap between the inspection function and the audit function is filled in

  8. Advancement of safeguards inspection technology for CANDU nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jae Sung; Park, W S; Cha, H R; Ham, Y S; Lee, Y G; Kim, K P; Hong, Y D

    1999-04-01

    The objectives of this project are to develop both inspection technology and safeguards instruments, related to CANDU safeguards inspection, through international cooperation, so that those outcomes are to be applied in field inspections of national safeguards. Furthermore, those could contribute to the improvement of verification correctness of IAEA inspections. Considering the level of national inspection technology, it looked not possible to perform national inspections without the joint use of containment and surveillance equipment conjunction with the IAEA. In this connection, basic studies for the successful implementation of national inspections was performed, optimal structure of safeguards inspection was attained, and advancement of safeguards inspection technology was forwarded. The successful implementation of this project contributed to both the improvement of inspection technology on CANDU reactors and the implementation of national inspection to be performed according to the legal framework. In addition, it would be an opportunity to improve the ability of negotiating in equal shares in relation to the IAEA on the occasion of discussing or negotiating the safeguards issues concerned. Now that the national safeguards technology for CANDU reactors was developed, the safeguards criteria, procedure and instruments as to the other item facilities and fabrication facilities should be developed for the perfection of national inspections. It would be desirable that the recommendations proposed and concreted in this study, so as to both cope with the strengthened international safeguards and detect the undeclared nuclear activities, could be applied to national safeguards scheme. (author)

  9. 9 CFR 355.19 - Inspector to be informed when plant operates.

    Science.gov (United States)

    2010-01-01

    ... AND VOLUNTARY INSPECTION AND CERTIFICATION CERTIFIED PRODUCTS FOR DOGS, CATS, AND OTHER CARNIVORA... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Inspector to be informed when plant operates. 355.19 Section 355.19 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT...

  10. Ultrasonic recording and display techniques for the inspection of nuclear power plant

    International Nuclear Information System (INIS)

    Ely, R.W.; Hall, G.D.; Johnson, A.; Pascoe, P.T.

    1985-01-01

    This paper describes four systems: MDU, PURDIE, LAURA and DRUID, under development as ultrasonic recording and display techniques for the inspection of nuclear power plant. The MDU system plots either plan or sectional views of the component under test onto a bistable storage screen. PURDIE is a system based around a video cassette recorder which has been modified to record ultrasonic A-scan waveforms and probe positional information. MDU and PURDIE are portable systems, for use under difficult site conditions. They may be manufactured in quantity to satisfy the demanding inspection programmes of nuclear power stations. LAURA is a desk top replay system for the video cassette tapes produced on site by PURDIE. DRUID is a digital desk top replay/display system incorporating a high resolution colour graphics terminal and therefore offering more flexibility and improved display formats. The systems are compatible with each other and some component units are directly interchangeable between the various systems

  11. 9 CFR 318.309 - Finished product inspection.

    Science.gov (United States)

    2010-01-01

    ... Section 318.309 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE AGENCY ORGANIZATION AND TERMINOLOGY; MANDATORY MEAT AND POULTRY PRODUCTS INSPECTION AND VOLUNTARY... Canning and Canned Products § 318.309 Finished product inspection. (a) Finished product inspections must...

  12. Eddy Currents Inspection of CANDU Steam Generator Tubes using Zetec's ZR-1 Robot. Experience in Romania

    International Nuclear Information System (INIS)

    Scott Hower; Luiza Vladu; Adrian Nichisov; Mihai Cretu

    2006-01-01

    Full text of publication follows: The commercial operation of Unit 1 of Cernavoda NPP started on 2 December, 1996. The unit's reactor type is PHWR-CANDU 6 (electrical capacity 706 MWe), using natural uranium. The nuclear fuel is manufactured in Romania. The Cernavoda nuclear power plant has four CANDU - design steam generators that have been in service since 1996. The paper introduces the new ZR-1 Robot System for Inspection and Maintenance/Repair from Zetec that combines the newest state-of-the-art robotics technology with Zetec experience - based innovation to address the needs for inspection and repair of steam generators. The multipurpose ZR-1 can be easily installed to perform the necessary eddy current inspection and remain installed ready for follow-up maintenance and repair. It has superior technical performances and a modular three axis motion of arm that enables 100% coverage of tube sheet. Automated, repeatable, and precise positioning of tool heads ensures accurate delivery and reducing costly rework and reduces inspection time by 30%. The modular, light weight, and portable design permits easy assembly and disassembly through small openings and it reduces setup/tear down time by 30%. The first deployment of the new ZR-1 Robot was made in September 2004 at the Cernavoda NPP inspection outage. The unit's reactor type is PHWR-CANDU 6 (electrical capacity 706 MWe), using natural uranium; the nuclear fuel is manufactured in Romania. The Cernavoda nuclear power plant Unit 1 has four CANDU - design steam generators that have been in service since 1996. The paper presents also the Zetec's field experience and customer experience with this system. It describes the equipment setup in Cernavoda's steam generators mock-up, functional tests and calibration. Finally, provides details on the execution of the inspection, options for standardizing the inspection techniques and conclusions. (authors)

  13. Development of Pre-Service and In-Service Information Management System (iSIMS)

    International Nuclear Information System (INIS)

    Yoo, H. J.; Choi, S. N.; Kim, H. N.; Kim, Y. H.; Yang, S. H.

    2004-01-01

    The iSTMS is a web-based integrated information system supporting Pre-Service and In-Service Inspection(PSI/ISI) processes for the nuclear power plants of KHNP(Korea Hydro and Nuclear Power Co. Ltd.). The system provides a full spectrum coverage of the inspection processes from the planning stage to the final report of examination in accordance with applicable codes, standards, and regulatory requirements. The major functions of the system includes the inspection planning, examination, reporting, project control and status reporting, resource management as well as objects search and navigation. The system also provides two dimensional or three dimensional visualization interface to identify the location and geometry of components and weld areas subject to examination in collaboration with database applications. The iSIMS is implemented with commercial software packages such as database management system, 2-D and 3-D visualization tool, etc., which provide open, updated and verified foundations. This paper describes the key functions and the technologies for the implementation of the iSIMS

  14. Development of Pre-Service and In-Service Information Management System (iSIMS)

    Energy Technology Data Exchange (ETDEWEB)

    Yoo, H. J.; Choi, S. N.; Kim, H. N.; Kim, Y. H.; Yang, S. H. [Korea Electric Power Research Institute, Daejeon (Korea, Republic of)

    2004-08-15

    The iSTMS is a web-based integrated information system supporting Pre-Service and In-Service Inspection(PSI/ISI) processes for the nuclear power plants of KHNP(Korea Hydro and Nuclear Power Co. Ltd.). The system provides a full spectrum coverage of the inspection processes from the planning stage to the final report of examination in accordance with applicable codes, standards, and regulatory requirements. The major functions of the system includes the inspection planning, examination, reporting, project control and status reporting, resource management as well as objects search and navigation. The system also provides two dimensional or three dimensional visualization interface to identify the location and geometry of components and weld areas subject to examination in collaboration with database applications. The iSIMS is implemented with commercial software packages such as database management system, 2-D and 3-D visualization tool, etc., which provide open, updated and verified foundations. This paper describes the key functions and the technologies for the implementation of the iSIMS

  15. Limitations of the inspection and testing concepts for pressurised components from the viewpoint of operating experience

    International Nuclear Information System (INIS)

    Schulz, H.

    2001-01-01

    The role of in-service inspection and testing is to contribute to a safe and reliable operation of systems, structures and components. It is therefore the objective of inspections and tests to identify malfunctions and degradations at a stage early enough to avoid detrimental impacts on safety as well as on the reliability of the plant. Taking mostly the pressure boundary of German light-water reactors as an example, it is the intention of this paper to analyse how successful present inspection and testing requirements are and to discuss limitations. Based on a review of the world-wide operating experience the following questions of a more generic nature are addressed: - Are the relevant damage mechanisms being addressed in our codes and standards? - What are the criteria to develop a representative scope of inspection? - How to maintain a sufficient level of information for a decreasing number of nuclear power plants in operation? It can be concluded that the revision of codes and standards according to lessons learned from operating experience remains as an ongoing process. Furthermore, the criteria applied to derive a representative scope of inspection need to be addressed in more detail, specifically with respect to corrosion. The continuous evaluation of operating experience of a large number of plants is the most valuable source to identify beginning degradations. (author)

  16. Defects and their inspectability by UT in current heavy section steels for nuclear power plant

    International Nuclear Information System (INIS)

    Onodera, S.; Ohkubo, Y.; Takeya, M.; Wataya, M.

    1983-01-01

    The ultrasonic examination (UT, hereinafter) techniques and their equipment have been improved in search of the defects in steels and structures for nuclear power plant components, while the acceptance standards of the defects became continually more stringent in a ''sword and armour'' race. Consequently, the steel making technique had to respond in minimizing the possible defects in steels with successful results in the past two decades. The conventional UT procedures cover basically the following categories of function. 1) Detection and location of defects. 2) Sizing of defects. 3) Characterization of defects. 4) Structure and residual stress effects in ultrasonic field. With proper considerations to the configuration of the steels under examination, the inspectability of the possible defects is further to be optimized. However, the final evaluation has often to be left to the discretion of a competent NDE engineer, well experienced in UT and knowledgeable in steel making. It is therefore the intention of the present paper to review the states-of-the-art of the defects found in the current heavy section steels for primary and secondary components of nuclear power plant, manufactured by the authors' plant. Typical defects, detectable size of them and inspectability of them are discussed

  17. Licensee contractor and vendor inspection status report. Quarterly report, April 1982-June 1982

    International Nuclear Information System (INIS)

    1982-07-01

    Firms designing nuclear steam supply systems, architect engineering firms doing design work on nuclear power plants, and certain selected vendors are currently inspected on a regular basis by the NRC. NRC inspectors, during periodic inspections, ascertain through direct observation of selected activities (including review of processes and selected hardware, discussions with employees and selected record review) whether a licensee or contractor is satisfactorily implementing a quality assurance program. If nonconformances with QA commitments are found, the inspected organization is requested to take appropriate corrective action and to institute preventive measures to preclude recurrence. In addition to the QA program inspections, NRC also conducts reactive inspections of the licensee's contractors and vendors. These are special, limited scope inspections to verify that organizations supplying safety-related equipment or services to licensed facilities are exercising appropriate corrective/preventive measures when defects or conditions which could adversely affect the safe operation of such facilities are identified and that these organizations are complying with the NRC requirements which govern the evaluation and reporting of such conditions

  18. Inspection of rotor bores, retaining rings and turbine discs utilizing UDRPS

    International Nuclear Information System (INIS)

    Quinn, J.R.

    1990-01-01

    New construction in the U.S. utility industry is at a very low level. The average age of plants in increasing almost linearly with time, many units will pass nominal end of life in the next decade. Planned new construction now takes ten years to effect at a minimum. The need for more reliable inspection of high stress utility components is and will continue to be a subject of increased emphasis. Dynacon Systems Inc. has recently introduced into commercial service, a fully automated ultrasonic inspection instrumentation package designed to significantly increase the reliability of turbine/generator rotor shaft, LP disc and generator retaining ring inspections. The package is designed to automate to a very high degree, the entire analysis process, thus eliminating operator error sources. The automated process begins at the ultrasonic pulse generator and ends with the input to fracture mechanics analysis

  19. 9 CFR 355.7 - Inauguration of inspection.

    Science.gov (United States)

    2010-01-01

    ... INSPECTION AND CERTIFICATION CERTIFIED PRODUCTS FOR DOGS, CATS, AND OTHER CARNIVORA; INSPECTION... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Inauguration of inspection. 355.7 Section 355.7 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE...

  20. 7 CFR 330.206 - Permits for plant pest movement associated with National Defense projects.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 5 2010-01-01 2010-01-01 false Permits for plant pest movement associated with... (Continued) ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE FEDERAL PLANT PEST REGULATIONS; GENERAL; PLANT PESTS; SOIL, STONE, AND QUARRY PRODUCTS; GARBAGE Movement of Plant Pests § 330.206...