WorldWideScience

Sample records for hyogo hadrontherapy project

  1. Acceleration characteristics of the injector Linacs for the Hyogo Hadrontherapy Center

    International Nuclear Information System (INIS)

    Inoue, J.; Sawada, K.; Sakata, T.

    2000-01-01

    Hyogo Hadrontherapy center in Harima Science Garden City is a cancer therapy facility with proton, helium and carbon beams. The beams are supplied by a synchrotron, which has manufactured by Mitsubishi Electric Corporation, with RF 1inacs as an injector, which has manufactured by Sumitomo Heavy Industries Ltd.(SHI). The injector consists of the identical ECR ion sources, a RFQ linac, and an Alvarez linac, which are connected by beam transport systems including vacuum systems, and some kinds of beam monitoring equipments. The results accomplished for the beam conditioning are described in this paper. (author)

  2. Operation of medical accelerator PATRO at Hyogo Ion Beam Medical Center

    International Nuclear Information System (INIS)

    Itano, A.; Akagi, T.; Higashi, A.; Fukushima, S.; Fujita, A.; Honda, Y.; Isa, H.; Nishikigouri, K.

    2004-01-01

    PATRO (Particle Accelerator for Therapy, Radiology and Oncology) is a medical accelerator facility for hadrontherapy of cancer at Hyogo Ion Beam Medical Center (HIBMC). Beam particles are proton (230 MeV) and carbon (320 MeV/u). After the beam commissioning and the tuning of irradiation system in 2000, we performed the clinical trials with proton and carbon beams from May 2001 until July 2002. We operated the accelerator for about 11,000 hours since the beginning of the beam tuning until the end of the clinical trials and for about 5,000 hours during the clinical trials. No serious troubles happened during the clinical trials. The stability and the reproducibility of the beams were well proved. (author)

  3. Progress in hadrontherapy

    CERN Document Server

    Braccini, S

    2007-01-01

    Hadrontherapy is an advanced technique of cancer radiation therapy which instead of X-rays employs beams of charged hadrons, protons and carbon ions in particular. Due to their physical and radio-biological properties, they allow to obtain a highly conformal treatment, sparing at best the surrounding healthy tissues. From being practised only in nuclear and particle physics laboratories, hadrontherapy is becoming today a clinical reality. By now about 45′000 patients have been treated worldwide with proton beams and several hospital based centres are either running or under construction. Carbon ions are characterized by a larger biological effectiveness than X-rays and protons and they are particularly suited to treat radio-resistant tumours. Carbon ion therapy is developing in the world and two hospital based centers are under construction in Europe. A large diffusion of hadrontherapy is foreseen in the near future but a much larger diffusion, possibly comparable with conventional X-ray radiation therapy, ...

  4. How to Move from Conventional Radiotherapy to Hadrontherapy

    International Nuclear Information System (INIS)

    Miralbell, Raymond

    2008-01-01

    In order to implement a hadrontherapy project a well defined partnership is needed. This would support both investment and research. The choice of treatment concept, site, number of gantries and financial issues should be the task to be addressed by a study group. A nodal network of medical centers should be recommended in order to assure the critical number of referrals and implement high quality clinical research trials

  5. The Italian project for a hadrontherapy centre

    Energy Technology Data Exchange (ETDEWEB)

    Amaldi, U. [European Organization for Nuclear Research, Geneva (Switzerland)]|[Universita di Milano, Como Seat, Via Lucini 3, 22100 Como (Italy); Arduini, G. [ASP, Villa Gualino, Via Settimio Severo 65, 10133 Torino (Italy); Badano, L. [Fondazione per Adroterapia Oncologica, Via Puccini 11, 28100 Novara (Italy); Cambria, R. [Fondazione per Adroterapia Oncologica, Via Puccini 11, 28100 Novara (Italy); Campi, D. [European Organization for Nuclear Research, Geneva (Switzerland); Gerardi, F. [Fondazione Italiana Ricerca sul Cancro, Via F. Corridoni 7, 20122 Milano (Italy); Gramatica, F. [Fondazione per Adroterapia Oncologica, Via Puccini 11, 28100 Novara (Italy); Leone, R. [Fondazione Italiana Ricerca sul Cancro, Via F. Corridoni 7, 20122 Milano (Italy); Manfredi, G. [Consiglio Nazionale delle Ricerche, ITBA, Via Ampere 56, 20131 Milano (Italy); Nonis, M. [Fondazione per Adroterapia Oncologica, Via Puccini 11, 28100 Novara (Italy); Pullia, M. [Fondazione per Adroterapia Oncologica, Via Puccini 11, 28100 Novara (Italy); Rossi, S. [Fondazione per Adroterapia Oncologica, Via Puccini 11, 28100 Novara (Italy); Sangaletti, L. [Fondazione Italiana Ricerca sul Cancro, Via F. Corridoni 7, 20122 Milano (Italy); Silari, M. [Consiglio Nazionale delle Ricerche, ITBA, Via Ampere 56, 20131 Milano (Italy); Tosi, G. [Fondazione per Adroterapia Oncologica, Via Puccini 11, 28100 Novara (Italy)]|[Istituto Europeo di Oncologia, Via Ripamonti 435, 22100 Milano (Italy)

    1995-06-01

    A feasibility study has just been completed for a hospital-based hadrontherapy facility to be built in Italy. This facility aims at the treatment of 1000 patients/year in 5 treatment rooms served by a H{sup -}/light ion synchrotron producing proton beams with energies ranging from 60 to 250 MeV. Generation of neutron beams for boron neutron capture therapy and production of positron emitting radionuclides for PET diagnostics is also foreseen. After an account of the rationale for the use of hadron beams in radiation therapy, a brief overview is given of both the technical components and the facility layout. Two of the treatment rooms will be equipped with a rotating isocentric irradiation unit. The design foresees the possibility of implementing, as a future development, acceleration of fully stripped light ions up to {sup 16}O to energies in the 120-400 MeV/u range. (orig.).

  6. Proton-therapy and hadron-therapy ionization chambers

    International Nuclear Information System (INIS)

    Boissonnat, Guillaume

    2015-01-01

    In the framework of the ARCHADE project (Advanced Resource Center for Hadron-therapy in Europe), a research project in Carbone ion beam therapy and clinical Proton-therapy, this work investigates the beam monitoring and dosimetry aspects of ion beam therapy. The main goal, here, is to understand the operating mode of air ionization chambers, the detectors used for such applications. This study starts at a very fundamental level as the involved physical and chemical parameters of air were measured in various electric field conditions with dedicated setups and used to produce a simulation tools aiming at reproducing the operating response in high intensity PBS (Pencil Beam Scanning) coming from IBA's (Ion Beam Applications) next generation of proton beam accelerators. In addition, an ionization chamber-based dosimetry equipment was developed, DOSION III, for radiobiology studies conducted at GANIL under the supervision of the CIMAP laboratory. (author)

  7. Hadrontherapy: the ENLIGHT network

    CERN Multimedia

    Ballantine, A; Dixon-Altaber, H; Dosanjh, M; Greco, V

    2012-01-01

    The use of ionizing radiation as a treatment for cancer is nowadays well established, but the traditional radiotherapy, which employs very energetic photons (X-­‐‑rays), has several side effects. Some dose is deposited in healthy tissues so that the toxicity of the treatment is quite high. Hadrontherapy is a new generation of radiotherapy, based on the use of charged particles (protons and ions), which can penetrate the tissue with liDle diffusion and deposit the maximum energy in a defined small area, so that important orgasn and healthy tissues can\

  8. Physicists' views on hadrontherapy: a survey of members of the Italian Association of Medical Physics (AIFM).

    Science.gov (United States)

    Giandini, Tommaso; Tenconi, Chiara; Carrara, Mauro; Ciocca, Mario; Russo, Stefania; Panaino, Costanza M V; Cattani, Federica; Ciardo, Delia; Morlino, Sara; Avuzzi, Barbara; Bedini, Nice; Villa, Sergio; Marvaso, Giulia; Romanelli, Paola; Hasegawa, Azusa; Vischioni, Barbara; Valvo, Francesca; Jereczek-Fossa, Barbara A; Orecchia, Roberto; Valdagni, Riccardo; Pignoli, Emanuele

    2017-09-18

    This study was based on a survey to investigate perceptions of hadrontherapy of the members of the Italian Association of Medical Physics (AIFM). The survey was digitally submitted to the 991 members between the end of January and the beginning of April 2016. A 19-item questionnaire was designed focusing on advantages and disadvantages of hadrontherapy, current status and possible future improvements, and need and opportunities for future investments in Italy and abroad. Information about professional qualifications, main fields of clinical involvement and specific competencies of the respondents was also collected. The survey was completed by 121 AIFM members (response rate 12.2%). In the answers collected, it was shown that medical physicists expressed interest in hadrontherapy mainly for reasons of personal interest rather than for professional needs (90% ± 2.5% vs. 52% ± 4.3% of the respondents, respectively), with a good knowledge of the related basic aspects as well as of the pros and cons of its application. However, poor knowledge of the current status of hadrontherapy was observed among the medical physicists not directly involved at a professional level, who were less than 3% of the physicists working in radiotherapy. In light of these results, the implementation of new training and education initiatives should be devised to promote a deeper and global knowledge of hadrontherapy-related issues, not only from a theoretical point of view but also in practical terms. Moreover, a close collaboration between highly specialized medical physicists employed in hadrontherapy centers and others in oncology hospitals should be -encouraged.

  9. The ULICE project

    CERN Multimedia

    Ballantine, A; Dixon-Altaber, H; Dosanjh, M; Kuchina, L

    2011-01-01

    ULICE is an infrastructure project funded by EC to address two different and complementary issues in cancer hadron therapy: the development of the appropriate instruments for high-performance hadrontherapy, with particular emphasis on carbon ion therapy, and the need for intensive collaboration among the existing and planned centres, as well as with the European hadrontherapy community at large.

  10. Design of a tracking device for on-line dose monitoring in hadrontherapy

    Energy Technology Data Exchange (ETDEWEB)

    Battistoni, G. [INFN Sezione di Milano, Milano (Italy); Collamati, F.; De Lucia, E. [Laboratori Nazionali di Frascati dell' INFN, Frascati (Italy); Faccini, R. [Dipartimento di Fisica, “La Sapienza” Università di Roma, Roma (Italy); INFN Sezione di Roma, Roma (Italy); Marafini, M. [INFN Sezione di Roma, Roma (Italy); Museo Storico della Fisica e Centro Studi e Ricerche “E. Fermi”, Roma (Italy); Mattei, I. [INFN Sezione di Milano, Milano (Italy); Muraro, S., E-mail: silvia.muraro@mi.infn.it [INFN Sezione di Milano, Milano (Italy); Paramatti, R. [INFN Sezione di Roma, Roma (Italy); Patera, V. [INFN Sezione di Roma, Roma (Italy); Museo Storico della Fisica e Centro Studi e Ricerche “E. Fermi”, Roma (Italy); Dipartimento di Scienze di Base e Applicate per Ingegneria, “La Sapienza” Università di Roma, Roma (Italy); Pinci, D. [INFN Sezione di Roma, Roma (Italy); Rucinski, A. [INFN Sezione di Roma, Roma (Italy); Dipartimento di Scienze di Base e Applicate per Ingegneria, “La Sapienza” Università di Roma, Roma (Italy); Russomando, A. [Dipartimento di Fisica, “La Sapienza” Università di Roma, Roma (Italy); INFN Sezione di Roma, Roma (Italy); Center for Life Nano Science@Sapienza, Istituto Italiano di Tecnologia, Roma (Italy); and others

    2017-02-11

    Hadrontherapy is a technique for cancer treatment that exploits ion beams (mostly protons and carbons). A critical issue is the accuracy that is achievable when monitoring the dose released by the beam to the tumor and to the surrounding tissues. We present the design of a tracking device, developed in the framework of the INSIDE project , capable of monitoring in real time the longitudinal profile of the dose delivered in the patient. This is possible by detecting the secondary particles produced by the interaction of the beam in the tissues. The position of the Bragg peak can be correlated to the charged particles emission point distribution measurement. The tracking device will be able to provide a fast response on the dose pattern by tracking the secondary charged fragments. The tracks are detected using 6 planes of scintillating fibers, providing the 3D coordinates of the track intersection with each plane. The fibers planes are followed by a plastic scintillator and by a small calorimeter built with a pixelated Lutetium Fine Silicate (LFS) crystal. A complete detector simulation, followed by the event reconstruction, has been performed to determine the achievable monitoring spatial resolution. - Highlights: • On-line range monitoring in hadrontherapy. • New approach: detection of charged secondary particles escaping the patient. • Correlation of longitudinal emission profile of secondaries with the beam range. • New detector integrated in a multi-modal system to be tested in clinical operation.

  11. Accelerators for Hadrontherapy

    CERN Document Server

    CERN. Geneva

    2001-01-01

    Hadrontherapy was born in 1938, when neutron beams were used in cancer therapy, but it has become an accepted therapeutical modality only in the last fifteen years. Fast neutrons are still in use, even if their limitations are now apparent. Charged hadron beams are more favourable, since the largest specific energy deposition occurs at the end of their range in matter. The most used hadrons are at present protons and carbon ions, which allow a dose deposition which conforms to the tumour target. Radiobiological experiments and the results of the first clinical trials indicate that carbon ions have, besides this macroscopic property, a different way of interacting with cell at the microscopic level. There are thus solid hopes to use carbon beams of about 4500 MeV to control tumours which are radioresistant both to X-rays and to protons. After discussing these macroscopic and microscopic properties and presenting the work carried out at CERN in the framework of the Proton Ion Medical Machine Study (PIMMS), the ...

  12. Hadrontherapy - macrobenefit in cancer therapy?

    Science.gov (United States)

    Habrand, J. L.; Baron, E.; Bourhis, J.; Datchary, J.; Mazal, A.; Meflah, K.

    2012-07-01

    Hadrontherapy is one of the most promising radiotherapeutical innovations that deal with accelerated heavy charged particles, mainly proton and carbon ions. Their salient features include an original dose-distribution, based on the Bragg curve, and in some of them an increased RBE at the range-end. Approximately 100 000 patients have been treated so far in approximately 40 centers worldwide. Outstanding outcomes have been substantiated in rare neoplasms using protons, such as ocular melanomas, skull base sarcomas, and pediatric malignancies, while only promising evidences have emerged using carbons. Assessing their place in more common tumor-sites, such as lung, pancreas, prostate, esophagus remains to be determined, and justifies the expansion of future particle therapy programs.

  13. Present challenges in hadrontherapy techniques

    Science.gov (United States)

    Amaldi, U.; Braccini, S.

    2011-07-01

    Hadrontherapy is a high-precision technique in cancer radiation therapy, which allows obtaining a superior conformal treatment with respect to photons used in conventional radiation therapy. To reach this ambitious goal without reducing the patient throughput needed in a hospital-based environment, the physical and radiobiological properties of charged hadrons, protons and carbon ions in particular, have to be exploited at best, making use of the most modern technologies issued from research in nuclear and particle physics. In the present days, we are assisting to a continuous technological challenge, leading to the conception and to the development of innovative methods and instruments. In this paper, the most relevant challenges in dose delivery systems, gantries, imaging, quality assurance and particle accelerators are reviewed.

  14. Transplant Procurement Management Model Training: Marked Improvement in the Mindset of In-Hospital Procurement Coordinators at Hyogo Prefecture, Japan.

    Science.gov (United States)

    Yoshikawa, M; Yoshinaga, K; Imamura, Y; Hayashi, T; Osako, T; Takahashi, K; Kaneko, M; Fujisawa, M; Kamidono, S

    2016-09-01

    The organ donation rate in Japan is much lower than that in other developed countries for several reasons. An advanced educational program for in-hospital procurement coordinators is a possible solution for this. We introduced a Transplant Procurement Management (TPM) educational program at Hyogo Prefecture, Japan. Ten healthcare professionals at Hyogo Prefecture participated in the Advanced International TPM course to educate themselves on TPM and held 2 TPM Model Organ Procurement Training Workshops at Hyogo Prefecture for in-hospital procurement coordinators. Furthermore, we held 2 workshops outside Hyogo Prefecture and at the same time undertook a pre-workshop questionnaire survey to evaluate the ability and motivation with respect to organ donation. To evaluate the effectiveness of the workshops, we conducted post-workshop and 3-months-after workshop questionnaire surveys. The results of the pre-workshop survey revealed that in-hospital procurement coordinators lacked the knowledge regarding the entire organ donation process, the current status of organ donation in Japan, and the definition of brain death. Moreover, they did not completely understand the meaning of "organ donation." The results of the post-workshop questionnaire survey showed that the educational program was effective to improve the knowledge and skills of organ donation and motivated behavioral changes among the participants. The survey results showed that our TPM model educational program offered sufficient knowledge and skills to increase organ donation at Hyogo Prefecture. We will continue this program and make an effort to further contribute to the Japanese organ donation activities. Copyright © 2016 Elsevier Inc. All rights reserved.

  15. Hadron-therapy beam monitoring: Towards a new generation of ultra-thin p-type silicon strip detectors

    International Nuclear Information System (INIS)

    Bouterfa, M.; Aouadi, K.; Bertrand, D.; Olbrechts, B.; Delamare, R.; Raskin, J. P.; Gil, E. C.; Flandre, D.

    2011-01-01

    Hadron-therapy has gained increasing interest for cancer treatment especially within the last decade. System commissioning and quality assurance procedures impose to monitor the particle beam using 2D dose measurements. Nowadays, several monitoring systems exist for hadron-therapy but all show a relatively high influence on the beam properties: indeed, most devices consist of several layers of materials that degrade the beam through scattering and energy losses. For precise treatment purposes, ultra-thin silicon strip detectors are investigated in order to reduce this beam scattering. We assess the beam size increase provoked by the Multiple Coulomb Scattering when passing through Si, to derive a target thickness. Monte-Carlo based simulations show a characteristic scattering opening angle lower than 1 mrad for thicknesses below 20 μm. We then evaluated the fabrication process feasibility. We successfully thinned down silicon wafers to thicknesses lower than 10 μm over areas of several cm 2 . Strip detectors are presently being processed and they will tentatively be thinned down to 20 μm. Moreover, two-dimensional TCAD simulations were carried out to investigate the beam detector performances on p-type Si substrates. Additionally, thick and thin substrates have been compared thanks to electrical simulations. Reducing the pitch between the strips increases breakdown voltage, whereas leakage current is quite insensitive to strips geometrical configuration. The samples are to be characterized as soon as possible in one of the IBA hadron-therapy facilities. For hadron-therapy, this would represent a considerable step forward in terms of treatment precision. (authors)

  16. ENVISION Project

    CERN Multimedia

    Ballantine, A; Dixon-Altaber, H; Dosanjh, M; Kuchina, L

    2011-01-01

    Hadrontherapy is a highly advanced technique of cancer radiotherapy that uses beams of charged particles (ions) to destroy tumour cells. While conventional X-rays traverse the human body depositing radiation as they pass through, ions deliver most of their energy at one point. Hadrontherapy is most advantageous once the position of the tumour is accurately known, so that healthy tissues can be protected. Accurate positioning is a crucial challenge for targeting moving organs, as in lung cancer, and for adapting the irradiation as the tumour shrinks with treatment. Therefore, quality assurance becomes one of the most relevant issues for an effective outcome of the cancer treatment. In order to improve the quality assurance tools for hadrontherapy, the European Commission is funding ENVISION, a 4-year project that aims at developing solutions for: real-• time non invasive monitoring • quantitative imaging • precise determination of delivered dose • fast feedback for optimal treatment planning • real-t...

  17. On results of aseismatic safety examination for atomic energy facilities based on Southern Hyogo Prefecture Earthquake in 1995

    International Nuclear Information System (INIS)

    1996-01-01

    The Nuclear Safety Commission received the report on the results of examination from the ad hoc examination committee. There was no particular effect to atomic energy facilities in the Southern Hyogo Prefecture Earthquake, however, from the viewpoint of perfecting the safety confirmation for atomic energy facilities, the Nuclear Safety Commission set up the aseismatic safety examination committee to investigate the validity of the guidelines related to aseismatic design used for safety examination. The basic plan of the investigation, the outline of the guidelines related to aseismatic design, the state of Southern Hyogo Prefecture Earthquake and the obtained knowledge and the investigation of the validity of the guidelines related to aseismatic design based on the state of Southern Hyogo Prefecture Earthquake are reported. The extraction of the items to be investigated, the evaluation of earthquakes and earthquake motion, vertical earthquake force and active faults, and the way of thinking on right under type earthquakes in the guideline for aseismatic design examination are reported. It was confirmed that the validity of guidelines is not impaired by the earthquake. (K.I.)

  18. PARTNER Project

    CERN Multimedia

    Ballantine, A; Dixon-Altaber, H; Dosanjh, M; Kuchina, L

    2011-01-01

    Hadrontherapy uses particle beams to treat tumours located near critical organs and tumours that respond poorly to conventional radiation therapy. It has become evident that there is an emerging need for reinforcing research in hadrontherapy and it is essential to train professionals in this rapidly developing field. PARTNER is a 4-year Marie Curie Training project funded by the European Commission with 5.6 million Euros aimed at the creation of the next generation of experts. Ten academic institutes and research centres and two leading companies are participating in PARTNER, that is coordinated by CERN, forming a unique multidisciplinary and multinational European network. The project offers research and training opportunities to 25 young biologists, engineers, physicians and physicists and is allowing them to actively develop modern techniques for treating cancer in close collaboration with leading European Institutions. For this purpose PARTNER relies on cutting edge research and technology development, ef...

  19. ELIMED, future hadrontherapy applications of laser-accelerated beams

    International Nuclear Information System (INIS)

    Cirrone, Giuseppe A.P.; Carpinelli, Massimo; Cuttone, Giacomo; Gammino, Santo; Bijan Jia, S.; Korn, Georg; Maggiore, Mario; Manti, Lorenzo; Margarone, Daniele; Prokupek, Jan; Renis, Marcella; Romano, Francesco; Schillaci, Francesco; Tomasello, Barbara; Torrisi, Lorenzo; Tramontana, Antonella; Velyhan, Andriy

    2013-01-01

    Laser-ion acceleration has recently gained a great interest as an alternative to conventional and more expensive acceleration techniques. These ion beams have desirable qualities such as small source size, high luminosity and small emittance to be used in different fields as Nuclear Physics, Medical Physics, etc. This is very promising specially for the future perspective of a new concept of hadrontherapy based on laser-based devices could be developed, replacing traditional accelerating machines. Before delivering laser-driven beams for treatments they have to be handled, cleaned from unwanted particles and characterized in order to have the clinical requirements. In fact ion energy spectra have exponential trend, almost 100% energy spread and a wide angular divergence which is the biggest issue in the beam transport and, hence, in a wider use of this technology. In order to demonstrate the clinical applicability of laser-driven beams new collaboration between ELI-Beamlines project researchers from Prague (Cz) and a INFN-LNS group from Catania (I) has been already launched and scientists from different countries have already express their will in joining the project. This cooperation has been named ELIMED (MEDical application at ELIBeamlines) and will take place inside the ELI-Beamlines infrastructure located in Prague. This work describes the schedule of the ELIMED project and the design of the energy selector which will be realized at INFN-LNS. The device is an important part of the whole transport beam line which will be realised in order to make the ion beams suitable for medical applications. -- Highlights: •We simulated the energy selection system, in order to optimize the device. •We simulated the experimental setup for the run at the TARANIS laser system. •We studied the efficiency of the devise for a proton beam with an uniform energy spectrum

  20. ELIMED, future hadrontherapy applications of laser-accelerated beams

    Energy Technology Data Exchange (ETDEWEB)

    Cirrone, Giuseppe A.P. [INFN-LNS, Catania (Italy); Institute of Physics of the ASCR, ELI-Beamlines Project, Prague (Czech Republic); Carpinelli, Massimo [INFN Sezione di Caglari, c/o Dipartimento di Fisica, Università di Cagliari, Cagliari (Italy); Cuttone, Giacomo; Gammino, Santo [INFN-LNS, Catania (Italy); Bijan Jia, S. [Ferdowsi University of Mashhad, Mashhad (Iran, Islamic Republic of); Korn, Georg [Institute of Physics of the ASCR, ELI-Beamlines Project, Prague (Czech Republic); Maggiore, Mario [Institute of Physics of the ASCR, ELI-Beamlines Project, Prague (Czech Republic); INFN-LNL, Legnaro (Italy); Manti, Lorenzo [University Federico II of Naples, Dip.to di Scienze Fisiche, Naples (Italy); Margarone, Daniele; Prokupek, Jan [Institute of Physics of the ASCR, ELI-Beamlines Project, Prague (Czech Republic); Renis, Marcella [University of Catania, Catania (Italy); Romano, Francesco [INFN-LNS, Catania (Italy); Centro Studi e Ricerche “E. Fermi”, Roma (Italy); Schillaci, Francesco, E-mail: francesco.schillaci@eli-beams.eu [INFN-LNS, Catania (Italy); Institute of Physics of the ASCR, ELI-Beamlines Project, Prague (Czech Republic); Tomasello, Barbara [University of Catania, Catania (Italy); Torrisi, Lorenzo [INFN-LNS, Catania (Italy); Dip. to di Fisica, University of Messina, Messina (Italy); Tramontana, Antonella [INFN-LNS, Catania (Italy); Velyhan, Andriy [Institute of Physics of the ASCR, ELI-Beamlines Project, Prague (Czech Republic)

    2013-12-01

    Laser-ion acceleration has recently gained a great interest as an alternative to conventional and more expensive acceleration techniques. These ion beams have desirable qualities such as small source size, high luminosity and small emittance to be used in different fields as Nuclear Physics, Medical Physics, etc. This is very promising specially for the future perspective of a new concept of hadrontherapy based on laser-based devices could be developed, replacing traditional accelerating machines. Before delivering laser-driven beams for treatments they have to be handled, cleaned from unwanted particles and characterized in order to have the clinical requirements. In fact ion energy spectra have exponential trend, almost 100% energy spread and a wide angular divergence which is the biggest issue in the beam transport and, hence, in a wider use of this technology. In order to demonstrate the clinical applicability of laser-driven beams new collaboration between ELI-Beamlines project researchers from Prague (Cz) and a INFN-LNS group from Catania (I) has been already launched and scientists from different countries have already express their will in joining the project. This cooperation has been named ELIMED (MEDical application at ELIBeamlines) and will take place inside the ELI-Beamlines infrastructure located in Prague. This work describes the schedule of the ELIMED project and the design of the energy selector which will be realized at INFN-LNS. The device is an important part of the whole transport beam line which will be realised in order to make the ion beams suitable for medical applications. -- Highlights: •We simulated the energy selection system, in order to optimize the device. •We simulated the experimental setup for the run at the TARANIS laser system. •We studied the efficiency of the devise for a proton beam with an uniform energy spectrum.

  1. Preliminary study for small animal preclinical hadrontherapy facility

    Energy Technology Data Exchange (ETDEWEB)

    Russo, G. [Institute of Molecular Bioimaging and Physiology, IBFM CNR-LATO, Cefalú (Italy); Pisciotta, P., E-mail: pietro.pisciotta@ibfm.cnr.it [Institute of Molecular Bioimaging and Physiology, IBFM CNR-LATO, Cefalú (Italy); National Institute for Nuclear Physics, Laboratori Nazionali del Sud, INFN-LNS, Catania (Italy); Cirrone, G.A.P.; Romano, F. [National Institute for Nuclear Physics, Laboratori Nazionali del Sud, INFN-LNS, Catania (Italy); Cammarata, F.; Marchese, V.; Forte, G.I.; Lamia, D.; Minafra, L.; Bravatá, V. [Institute of Molecular Bioimaging and Physiology, IBFM CNR-LATO, Cefalú (Italy); Acquaviva, R. [University of Catania, Catania (Italy); Gilardi, M.C. [Institute of Molecular Bioimaging and Physiology, IBFM CNR-LATO, Cefalú (Italy); Cuttone, G. [National Institute for Nuclear Physics, Laboratori Nazionali del Sud, INFN-LNS, Catania (Italy)

    2017-02-21

    Aim of this work is the study of the preliminary steps to perform a particle treatment of cancer cells inoculated in small animals and to realize a preclinical hadrontherapy facility. A well-defined dosimetric protocol was developed to explicate the steps needed in order to perform a precise proton irradiation in small animals and achieve a highly conformal dose into the target. A precise homemade positioning and holding system for small animals was designed and developed at INFN-LNS in Catania (Italy), where an accurate Monte Carlo simulation was developed, using Geant4 code to simulate the treatment in order to choose the best animal position and perform accurately all the necessary dosimetric evaluations. The Geant4 application can also be used to realize dosimetric studies and its peculiarity consists in the possibility to introduce the real target composition in the simulation using the DICOM micro-CT image. This application was fully validated comparing the results with the experimental measurements. The latter ones were performed at the CATANA (Centro di AdroTerapia e Applicazioni Nucleari Avanzate) facility at INFN-LNS by irradiating both PMMA and water solid phantom. Dosimetric measurements were performed using previously calibrated EBT3 Gafchromic films as a detector and the results were compared with the Geant4 simulation ones. In particular, two different types of dosimetric studies were performed: the first one involved irradiation of a phantom made up of water solid slabs where a layer of EBT3 was alternated with two different slabs in a sandwich configuration, in order to validate the dosimetric distribution. The second one involved irradiation of a PMMA phantom made up of a half hemisphere and some PMMA slabs in order to simulate a subcutaneous tumour configuration, normally used in preclinical studies. In order to evaluate the accordance between experimental and simulation results, two different statistical tests were made: Kolmogorov test and

  2. Preliminary study for small animal preclinical hadrontherapy facility

    Science.gov (United States)

    Russo, G.; Pisciotta, P.; Cirrone, G. A. P.; Romano, F.; Cammarata, F.; Marchese, V.; Forte, G. I.; Lamia, D.; Minafra, L.; Bravatá, V.; Acquaviva, R.; Gilardi, M. C.; Cuttone, G.

    2017-02-01

    Aim of this work is the study of the preliminary steps to perform a particle treatment of cancer cells inoculated in small animals and to realize a preclinical hadrontherapy facility. A well-defined dosimetric protocol was developed to explicate the steps needed in order to perform a precise proton irradiation in small animals and achieve a highly conformal dose into the target. A precise homemade positioning and holding system for small animals was designed and developed at INFN-LNS in Catania (Italy), where an accurate Monte Carlo simulation was developed, using Geant4 code to simulate the treatment in order to choose the best animal position and perform accurately all the necessary dosimetric evaluations. The Geant4 application can also be used to realize dosimetric studies and its peculiarity consists in the possibility to introduce the real target composition in the simulation using the DICOM micro-CT image. This application was fully validated comparing the results with the experimental measurements. The latter ones were performed at the CATANA (Centro di AdroTerapia e Applicazioni Nucleari Avanzate) facility at INFN-LNS by irradiating both PMMA and water solid phantom. Dosimetric measurements were performed using previously calibrated EBT3 Gafchromic films as a detector and the results were compared with the Geant4 simulation ones. In particular, two different types of dosimetric studies were performed: the first one involved irradiation of a phantom made up of water solid slabs where a layer of EBT3 was alternated with two different slabs in a sandwich configuration, in order to validate the dosimetric distribution. The second one involved irradiation of a PMMA phantom made up of a half hemisphere and some PMMA slabs in order to simulate a subcutaneous tumour configuration, normally used in preclinical studies. In order to evaluate the accordance between experimental and simulation results, two different statistical tests were made: Kolmogorov test and

  3. Preliminary study for small animal preclinical hadrontherapy facility

    International Nuclear Information System (INIS)

    Russo, G.; Pisciotta, P.; Cirrone, G.A.P.; Romano, F.; Cammarata, F.; Marchese, V.; Forte, G.I.; Lamia, D.; Minafra, L.; Bravatá, V.; Acquaviva, R.; Gilardi, M.C.; Cuttone, G.

    2017-01-01

    Aim of this work is the study of the preliminary steps to perform a particle treatment of cancer cells inoculated in small animals and to realize a preclinical hadrontherapy facility. A well-defined dosimetric protocol was developed to explicate the steps needed in order to perform a precise proton irradiation in small animals and achieve a highly conformal dose into the target. A precise homemade positioning and holding system for small animals was designed and developed at INFN-LNS in Catania (Italy), where an accurate Monte Carlo simulation was developed, using Geant4 code to simulate the treatment in order to choose the best animal position and perform accurately all the necessary dosimetric evaluations. The Geant4 application can also be used to realize dosimetric studies and its peculiarity consists in the possibility to introduce the real target composition in the simulation using the DICOM micro-CT image. This application was fully validated comparing the results with the experimental measurements. The latter ones were performed at the CATANA (Centro di AdroTerapia e Applicazioni Nucleari Avanzate) facility at INFN-LNS by irradiating both PMMA and water solid phantom. Dosimetric measurements were performed using previously calibrated EBT3 Gafchromic films as a detector and the results were compared with the Geant4 simulation ones. In particular, two different types of dosimetric studies were performed: the first one involved irradiation of a phantom made up of water solid slabs where a layer of EBT3 was alternated with two different slabs in a sandwich configuration, in order to validate the dosimetric distribution. The second one involved irradiation of a PMMA phantom made up of a half hemisphere and some PMMA slabs in order to simulate a subcutaneous tumour configuration, normally used in preclinical studies. In order to evaluate the accordance between experimental and simulation results, two different statistical tests were made: Kolmogorov test and

  4. On the torbernite from Kakinoki Mine, Hyogo Prefecture

    International Nuclear Information System (INIS)

    Kiji, Michio

    1982-01-01

    Upon visiting Kakinoki Mine, Hyogo Prefecture, in August, 1980, the author collected the green-colored mineral in square plate form adhering on the surfaces of waste ore. It was discovered that this was torbernite, the first uranium-containing mineral discovered in the area. Its deposit classified as hydatogenetic deposit, since the Kakinoki Mine being an abandoned copper mine. Torbernite exists only in blackish pelite (waste ore), and adheres on the surface and the cleavage, either as small platy crystals or their aggregate. In the blackish pelite, numerous quartz veins were observed, where torbernite occasionally appeared. The torbernite adhering on the surface and cleavage was grass-green and translucent, and the one in the quartz veins was emerald-green and transparent or translucent. The detection of torbernite in the waste ore suggests the potentiality of finding uranium in the Kakinoki Mine. (J.P.N.)

  5. Monte Carlo simulation tool for online treatment monitoring in hadrontherapy with in-beam PET: A patient study.

    Science.gov (United States)

    Fiorina, E; Ferrero, V; Pennazio, F; Baroni, G; Battistoni, G; Belcari, N; Cerello, P; Camarlinghi, N; Ciocca, M; Del Guerra, A; Donetti, M; Ferrari, A; Giordanengo, S; Giraudo, G; Mairani, A; Morrocchi, M; Peroni, C; Rivetti, A; Da Rocha Rolo, M D; Rossi, S; Rosso, V; Sala, P; Sportelli, G; Tampellini, S; Valvo, F; Wheadon, R; Bisogni, M G

    2018-05-07

    Hadrontherapy is a method for treating cancer with very targeted dose distributions and enhanced radiobiological effects. To fully exploit these advantages, in vivo range monitoring systems are required. These devices measure, preferably during the treatment, the secondary radiation generated by the beam-tissue interactions. However, since correlation of the secondary radiation distribution with the dose is not straightforward, Monte Carlo (MC) simulations are very important for treatment quality assessment. The INSIDE project constructed an in-beam PET scanner to detect signals generated by the positron-emitting isotopes resulting from projectile-target fragmentation. In addition, a FLUKA-based simulation tool was developed to predict the corresponding reference PET images using a detailed scanner model. The INSIDE in-beam PET was used to monitor two consecutive proton treatment sessions on a patient at the Italian Center for Oncological Hadrontherapy (CNAO). The reconstructed PET images were updated every 10 s providing a near real-time quality assessment. By half-way through the treatment, the statistics of the measured PET images were already significant enough to be compared with the simulations with average differences in the activity range less than 2.5 mm along the beam direction. Without taking into account any preferential direction, differences within 1 mm were found. In this paper, the INSIDE MC simulation tool is described and the results of the first in vivo agreement evaluation are reported. These results have justified a clinical trial, in which the MC simulation tool will be used on a daily basis to study the compliance tolerances between the measured and simulated PET images. Copyright © 2018 Associazione Italiana di Fisica Medica. Published by Elsevier Ltd. All rights reserved.

  6. SLIM (SEM for Low Interception Monitoring) An Innovative Non-Destructive Beam Monitor for the Extraction Lines of a Hadrontherapy Centre

    CERN Document Server

    Badano, L; Pezzetta, M; Molinari, G

    2003-01-01

    Real time monitoring of hadrontherapy beam intensity and profile is a critical issue for the optimisation of the dose delivery to the patient carcinogenic tissue, the patient safety and the operation of the accelerator complex. For this purpose an innovative beam monitor, based on the secondary emission of electrons by a nonperturbative, sub-micron thick Al target placed directly in the extracted beam path, is being proposed. The secondary electrons, accelerated by an electrostatics focusing system, are detected by a monolithic silicon position sensitive sensor, which provides the beam intensity and its position with a precision of 1 mm at 10 kHz frame rate. The conceptual design and the engineering study optimised for hadrontherapy, together with the results of the preliminary tests of the first system prototype, will be presented.

  7. Construction and tests of an in-beam PET-like demonstrator for hadrontherapy beam ballistic control

    Energy Technology Data Exchange (ETDEWEB)

    Montarou, G., E-mail: montarou@clermont.in2p3.fr [Clermont University, Blaise Pascal University, CNRS/IN2P3, Laboratoire de Physique Corpusculaire, BP 10448, Clermont-Ferrand F-63000 (France); Bony, M.; Busato, E.; Chadelas, R. [Clermont University, Blaise Pascal University, CNRS/IN2P3, Laboratoire de Physique Corpusculaire, BP 10448, Clermont-Ferrand F-63000 (France); Donnarieix, D. [Centre Jean Perrin, Service de Physique Médicale, Clermont-Ferrand F-63000 (France); Force, P.; Guicheney, C.; Insa, C.; Lambert, D.; Lestand, L.; Magne, M.; Martin, F. [Clermont University, Blaise Pascal University, CNRS/IN2P3, Laboratoire de Physique Corpusculaire, BP 10448, Clermont-Ferrand F-63000 (France); Millardet, C. [Centre Jean Perrin, Service de Physique Médicale, Clermont-Ferrand F-63000 (France); Nivoix, M.; Podlyski, F.; Rozes, A. [Clermont University, Blaise Pascal University, CNRS/IN2P3, Laboratoire de Physique Corpusculaire, BP 10448, Clermont-Ferrand F-63000 (France)

    2017-02-11

    We present the first results obtained with a detector, called Large Area Pixelized Detector (LAPD), dedicated to the study the ballistic control of the beam delivered to the patient by in-beam and real time detection of secondary particles, emitted during its irradiation in the context of hadrontherapy. These particles are 511 keV γ from the annihilation of a positron issued from the β{sup +} emitters induced in the patient tissues along the beam path. The LAPD basic concepts are similar to a conventional PET camera. The 511 keV γ are detected and the reconstructed lines of response allow to measure the β{sup +} activity distribution. Nevertheless, when trying to use γ from positron annihilation for the ballistic control in hadrontherapy, the large prompt γ background should be taken into account and properly rejected. First reconstruction results, obtained with a phantom filled with a high intensity FDG source at the cancer research centre of Clermont-Ferrand are shown. We also report results of measurements performed at the Heidelberg Ion-Beam Therapy Centre with one third of the detector, using proton and carbon ion beams.

  8. Design of a "Riesenrad" Ion Gantry for Hadrontherapy

    CERN Document Server

    Reimoser, S

    2000-01-01

    The benefit of hadrontherapy can be maximized by offering the possibility to deliver the particle beam from any direction in space towards the patient with the help of a medical gantry. For carbon ions, their increased (magnetic) beam rigidity yields considerable structural difficulties and has so far prevented a practical realization of an ion gantry. The concept of a 'Riesenrad' ion gantry promises to provide an effective and efficient solution. The basic idea is to deflect the ion beam with a single 90° dipole, which rotates around the incoming beam axis, and direct it towards the eccentrically positioned patient cabin. Inside the cabin similar conditions as exist in a classical isocentric treatment room prevail. The practical design of such a Riesenrad gantry, its structural principles and its function are presented. The underlying beam optics and its integration into the mechanical structure are explained. Aspects of safety, and flexibility are discussed.

  9. Design basis earthquakes for critical industrial facilities and their characteristics, and the Southern Hyogo prefecture earthquake, 17 January 1995

    Energy Technology Data Exchange (ETDEWEB)

    Shibata, Heki

    1998-12-01

    This paper deals with how to establish the concept of the design basis earthquake (DBE) for critical industrial facilities such as nuclear power plants in consideration of disasters such as the Southern Hyogo prefecture earthquake, the so-called Kobe earthquake in 1995. The author once discussed various DBEs at the 7th World Conference on Earthquake Engineering. At that time, the author assumed that the strongest effective PGA would be 0.7 G, and compared the values of accelerations of a structure obtained by various codes in Japan and other countries. The maximum PGA observed by an instrument at the Southern Hyogo prefecture earthquake in 1995 exceeded the previous assumption of the author, even though the results of the previous paper had been pessimistic. According to the experience of the Kobe event, the author will point out the necessity of the third earthquake S{sub s} adding to S{sub 1} and S{sub 2} of previous DBEs.

  10. Study of the in line measurements of β+ activity induced during hadron-therapy treatments for their ballistic control

    International Nuclear Information System (INIS)

    Lestand, L.

    2012-01-01

    Cancer remains the main cause of death in France which constitutes a major public heath care issue. Among all therapeutic alternatives currently used in clinical routine there are all external radiation therapy techniques. A new type of highly conformational radiation therapy, called hadron-therapy has been developed over almost 50 years. Ballistic accuracy relies on a set of parameters which can be affected by different sources of uncertainties that remain hardly predictable. Therefore, this technic requires the definition of quality assurance (QA) procedures to prevent any deleterious health consequences for the patient. Such QA procedures can be achieved by measuring the induced β + activity by means of Positron Emission Tomography. The first results obtained by simulations and through different experiments performed on proton and carbon ion beams have lead to define a methodology of data acquisition and analysis compatible with in-beam QA of hadron-therapy treatments. Moreover, experiment performed at GANIL (carbon beam) and CPO Orsay (proton beam) have helped to initiate the construction of a larger detector which could be used within different clinical routine treatments. (author)

  11. The Hyogo Framework for Action and its implications for disaster management and reduction in Africa

    Directory of Open Access Journals (Sweden)

    Dejo Olowu

    2010-04-01

    Full Text Available At the World Conference on Disaster Reduction, Hyogo, Japan, in January 2005, the international community adopted a 10-year plan to make the world safer from disasters. The resultant Hyogo Framework for Action is the global blueprint for disaster risk reduction with the goal of substantially reducing disaster losses in human lives and socio-economic assets. What is the signi!cance of the HFA for the adoption of disaster prevention, management and risk reduction frameworks in African States? Since 2005, what has been the attitude of African States to the promise of the HFA? In terms of policy and planning, how should African States engage the HFA towards securing human lives and properties against natural and human-induced disasters? With the myriad challenges of mass poverty and underdevelopment across Africa, what implications does the HFA hold for disaster risk reduction and management in African States? This article attempts to address this plethora of questions, drawing on lessons learned in Africa and beyond. The article examines the background of the HFA and its progress in shaping the global policy agenda towards disaster management and reduction. While the article acknowledges some of the inherent weaknesses in the promise of the HFA, it nonetheless accentuates its inimitable implications for broad legal and policy strategies towards ameliorating the usual horrific aftermath of disasters in Africa.

  12. Relationship between terrestrial gamma ray dose rates and geology of Awaji Island in Hyogo Prefecture

    International Nuclear Information System (INIS)

    Shibayama, Motohiko; Hiraoka, Yoshitsugu; Ikeda, Tadashi; Terado, Shin

    2004-01-01

    In order to clarify the relationship between terrestrial gamma ray dose rates and surface geology, measurements were carried out for the entire part f Awaji Island in Hyogo Prefecture. The results of analysis were summarized as follows. (1) The mean value for each geology was nearly the same as that in the whole of Japan. (2) The granitic rocks can be divided into three groups, based on their stages of intrusion (Tainsyo, 1985). the dose rate levels for granitic rocks increased from fast stage over third stage. (author)

  13. 12C fragmentation at 95 MeV per nucleon for hadron-therapy. Experimental study and simulation with thick PMMA targets

    International Nuclear Information System (INIS)

    Braunn, B.

    2010-11-01

    A study of the 12 C fragmentation at 95 MeV per nucleon on thick PMMA targets is presented on this document. This study is motivated by the development of a new technique for irradiation of malignant tumours: the carbon ion therapy. The purpose of this work is to compare experimental data against nuclear models used in GEANT4 tool-kit. The aim is to determine if the models are sufficiently predictive to the criteria of hadron-therapy. To achieve this goal, a first experiment was performed at GANIL with a 12 C beam at 95 MeV/u and thick PMMA targets. This experiment has achieved the production rates, angular and energy distributions of different fragments produced in nuclear collisions. Comparisons between experimental data and simulated results obtained using the binary intra-nuclear cascade (BIC) and quantum molecular dynamics model (QMD) available in GEANT4 have been performed. These comparisons show the inability of the tested models to reproduce carbon fragmentation at 95 MeV per nucleon with the accuracy required in hadron-therapy. (author)

  14. Beam monitoring in radiotherapy and hadron-therapy

    International Nuclear Information System (INIS)

    Fontbonne, J.M.

    2012-01-01

    Radiotherapy techniques have evolved over the past twenty years. For photon beams, the development of tools such as multi leaf collimators, machines such as Cyberknife or tomo-therapy, have improved the conformation of treatments to the tumor volume and lowered maximum dose to healthy tissue. In another register, the use of proton-therapy is expanding in all countries and the development of carbon ions beams for hadron-therapy is also increasing. If techniques improve, the control requirements for the monitoring of the dose administered to patients are always the same. This document presents, first, the ins and outs of the different techniques of external beam radiotherapy: photon treatments, protons and hadrons. Starting from the basis of clinical requirements, it sets the variables to be measured in order to ensure the quality of treatment for the different considered modalities. It then describes some implementations, based on precise and rigorous specifications, for the monitoring and measurement of beams delivered by external beam radiotherapy equipments. Two instrumental techniques are particularly highlighted, plastic scintillators dosimetry for the control of megavoltage photon beams and ionization chamber dosimetry applied to proton-therapy or radiobiology experiments conducted at the GANIL facility. Analyzes and perspectives, based on the recent developments of treatment techniques, are delivered in conclusion and can serve as guide for future instrumental developments. (author)

  15. A new Early Cretaceous eutherian mammal from the Sasayama Group, Hyogo, Japan.

    Science.gov (United States)

    Kusuhashi, Nao; Tsutsumi, Yukiyasu; Saegusa, Haruo; Horie, Kenji; Ikeda, Tadahiro; Yokoyama, Kazumi; Shiraishi, Kazuyuki

    2013-05-22

    We here describe a new Early Cretaceous (early Albian) eutherian mammal, Sasayamamylos kawaii gen. et sp. nov., from the 'Lower Formation' of the Sasayama Group, Hyogo Prefecture, Japan. Sasayamamylos kawaii is characterized by a robust dentary, a distinct angle on the ventral margin of the dentary at the posterior end of the mandibular symphysis, a lower dental formula of 3-4 : 1 : 4 : 3, a robust lower canine, a non-molariform lower ultimate premolar, and a secondarily reduced entoconid on the molars. To date, S. kawaii is the earliest known eutherian mammal possessing only four premolars, which demonstrates that the reduction in the premolar count in eutherians started in the late Early Cretaceous. The occurrence of S. kawaii implies that the relatively rapid diversification of eutherians in the mid-Cretaceous had already started by the early Albian.

  16. Project of compact accelerator for cancer proton therapy

    International Nuclear Information System (INIS)

    Picardi, L.; Ronsivalle, C.; Vignati, A.

    1995-04-01

    The status of the sub-projetc 'Compact Accelerator' in the framework of the Hadrontherapy Project leaded by Prof. Amaldi is described. Emphasis is given to the reasons of the use of protons for radiotherapy applications, to the results of the preliminary design studies of four types of accelerators as possible radiotherapy dedicated 'Compact Accelerator' and to the scenario of the fonts of financial resources

  17. Light ions radiobiological effects on human tumoral cells: measurements modelling and application to hadron-therapy; Mesures et modelisation des effets radiobiologiques des ions legers sur des cellules tumorales humaines: application a l'hadrontherapie

    Energy Technology Data Exchange (ETDEWEB)

    Jalade, P

    2005-11-15

    In classical radiotherapy, the characteristics of photons interactions undergo limits for the treatment of radioresistant and not well located tumours. Pioneering treatments of patients at the Lawrence Laboratory at Berkeley has demonstrated two advantages of hadrons beams: the Relative Biologic Effect (the RBE) and the ballistic of the beams. Since 1994, the clinical centre at Chiba, has demonstrated successfully the applicability of the method. A physics group, managed by G. Kraft, at Darmstadt in Germany, has underlined the advantages of carbon beams. An European pool, called ENGIGHT (European Network for LIGHt ion Therapy) has been created in which the French ETOILE project appeared. The purpose of the thesis concerns measurements and models of 'in vitro' human cells survival. In the first part, the nowadays situation in particles interactions, tracks and cells structures and radiobiology is presented here. The second is devoted to the models based on the beam tracks and localization of the physical dose. Discussion of sensitivity to various parameters of the model has been realized with the help of numerical simulations. Finally the predictions of the improved model has been compared to experimental irradiations of human cells with argon and carbon beams of the GANIL machine. Conclusion of such study shows the performance and limits of a local model for predicting the radiobiological efficiency of light ions in hadron-therapy. (author)

  18. Infectivity of HBV DNA positive donations identified in look-back studies in Hyogo-Prefecture, Japan.

    Science.gov (United States)

    Bouike, Y; Imoto, S; Mabuchi, O; Kokubunji, A; Kai, S; Okada, M; Taniguchi, R; Momose, S; Uchida, S; Nishio, H

    2011-04-01

    To clarify transfusion incidence of hepatitis B virus (HBV) infected blood negative for mini pool-nucleic acid amplification testing (MP-NAT). Japanese Red Cross (JRC) blood centres screen donated blood to avoid contamination with HBV. However, a low copy number of HBV may be overlooked. In Hyogo-Prefecture, JRC blood centres screened 787 695 donations for HBV from April 2005 to March 2009. Of these, 685 844 were donations from the repeat donors. To detect the donors with HBV, serological tests, MP-NAT and/or individual donation (ID)-NAT were performed. To detect the recipients with transfusion-transmitted HBV infection (TTHBI), serological analysis and/or ID-NAT were performed. In this study, 265 of the 685 844 repeat donations were serologically and/or MP-NAT positive for HBV. Their repository samples from the previous donation were examined in a look-back study; 13 of the 265 repository samples proved ID-NAT positive. Twelve recipients were transfused with HBV-infected blood components derived from 10 of the 13 HBV-infected donors. Only 1 of the 12 recipients was identified as TTHBI case. Seven of the 12 recipients escaped from our follow-up study and 4 recipients were negative for HBV during the observation period. On the basis of the look-back study among the repeat donors in Hyogo-Prefecture, Japan, donations with HBV-infected blood negative for MP-NAT occurred with a frequency of 13 in 685 844 donations (∼1/53 000 donations). However, more than half of the recipients transfused with HBV-infected blood negative for MP-NAT could not be followed up. It is necessary to establish a more cautious follow-up system. © 2010 The Authors. Transfusion Medicine © 2010 British Blood Transfusion Society.

  19. Effects of the South Hyogo earthquake on LNG facilities and damage prevention measures; Effets du tremblement de terre de Hyogo-Sud sur les installations GNL et mesures pour la prevention des degats

    Energy Technology Data Exchange (ETDEWEB)

    Yoichi, Fuchimoto [Osaka Gas Co., Ltd., Dept. Production (Japan); Yukiyoshi, Hasegawa [Osaka Gas Co., Ltd., Senboku LNG Terminail (Japan); Ysuhiro, Ueno; Junji, Doi [Osaka Gas Co., Ltd., Engineering Dept. (Japan)

    2000-07-01

    The South Hyogo Earthquake that took place in the morning of January 17, 1995, at about 5:46 A.M. registered a magnitude of 7.2 on the Richter scale with earthquake motion of 800 gal (horizontal) on the ground surface. It was the largest vertical-motion earthquake to hit a major urban area in modern days, and it struck the service area of Osaka Gas. The ground motion values monitored were 240 gal at the Senboku LNG Terminal and 189 gal at the Himeji LNG Terminal, but these terminals did not receive sufficient damage to affect their gas processing or supply functions. There were also seven gas holders operating in the worst hit area, where ground motion of 616 to 833 gal was recorded. However, these gas holders were also not damaged by the earthquake. These gas processing plants and supply facilities were constructed in compliance with the current seismic design standards, and they incorporate elastic design (capable of withstanding ground motion of 300 gal max.) in which due consideration is given to factors such as their importance and the ground characteristics. Although the South Hyogo Earthquake generated ground motion that far exceeded the design level of the gas holders, the facilities maintained their integrity without shape deformation, thus demonstrating their high level of earthquake resistance. For other gas processing facilities, Osaka Gas conducted evaluations of their resistance to an extremely large earthquake using the ultimate strength design method, and confirmed similar levels of earthquake resistance performance. According to the above examination results, it was found that design based on the current seismic design standards is capable of withstanding an earthquake of high magnitude. However, the current seismic design standards do not take into consideration earthquakes of an extremely high magnitude or specify the use of the ultimate strength design method. Therefore, The Japan Gas Association is currently examining standards that take those

  20. Light ions radiobiological effects on human tumoral cells: measurements modelling and application to hadron-therapy; Mesures et modelisation des effets radiobiologiques des ions legers sur des cellules tumorales humaines: application a l'hadrontherapie

    Energy Technology Data Exchange (ETDEWEB)

    Jalade, P

    2005-11-15

    In classical radiotherapy, the characteristics of photons interactions undergo limits for the treatment of radioresistant and not well located tumours. Pioneering treatments of patients at the Lawrence Laboratory at Berkeley has demonstrated two advantages of hadrons beams: the Relative Biologic Effect (the RBE) and the ballistic of the beams. Since 1994, the clinical centre at Chiba, has demonstrated successfully the applicability of the method. A physics group, managed by G. Kraft, at Darmstadt in Germany, has underlined the advantages of carbon beams. An European pool, called ENGIGHT (European Network for LIGHt ion Therapy) has been created in which the French ETOILE project appeared. The purpose of the thesis concerns measurements and models of 'in vitro' human cells survival. In the first part, the nowadays situation in particles interactions, tracks and cells structures and radiobiology is presented here. The second is devoted to the models based on the beam tracks and localization of the physical dose. Discussion of sensitivity to various parameters of the model has been realized with the help of numerical simulations. Finally the predictions of the improved model has been compared to experimental irradiations of human cells with argon and carbon beams of the GANIL machine. Conclusion of such study shows the performance and limits of a local model for predicting the radiobiological efficiency of light ions in hadron-therapy. (author)

  1. Dose measurement using radiochromic lms and Monte Carlo simulation for hadron-therapy

    International Nuclear Information System (INIS)

    Zahra, N.

    2010-06-01

    Because of the increase in dose at the end of the range of ions, dose delivery during patient treatment with hadron-therapy should be controlled with high precision. Monte Carlo codes are now considered mandatory for validation of clinical treatment planning and as a new tool for dosimetry of ion beams. In this work, we aimed to calculate the absorbed dose using Monte Carlo simulation Geant4/Gate. The effect on the dose calculation accuracy of different Geant4 parameters has been studied for mono-energetic carbon ion beams of 300 MeV/u in water. The parameters are: the production threshold of secondary particles and the maximum step limiter of the particle track. Tolerated criterion were chosen to meet the precision required in radiotherapy in term of value and dose localisation (2%, 2 mm respectively) and to obtain the best compromise on dose distribution and computational time. We propose here the values of parameters in order to satisfy the precision required. In the second part of this work, we study the response of radiochromic films MD-v2-55 for quality control in proton and carbon ion beams. We have particularly observed and studied the quenching effect of dosimetric films for high LET (≥20 keV/μm) irradiation in homogeneous and heterogeneous media. This effect is due to the high ionization density around the track of the particle. We have developed a method to predict the response of radiochromic films taking into account the saturation effect. This model is called the RADIS model for 'Radiochromic films Dosimetry for Ions using Simulations'. It is based on the response of films under photon irradiations and the saturation of films due to high linear energy deposit calculated by Monte Carlo. Different beams were used in this study and aimed to validate the model for hadron-therapy applications: carbon ions, protons and photons at different energies. Experiments were performed at Grand Accelerateur National d'Ions Lourds (GANIL), Proton therapy center of

  2. Light ions radiobiological effects on human tumoral cells: measurements modelling and application to hadron-therapy

    International Nuclear Information System (INIS)

    Jalade, P.

    2005-11-01

    In classical radiotherapy, the characteristics of photons interactions undergo limits for the treatment of radioresistant and not well located tumours. Pioneering treatments of patients at the Lawrence Laboratory at Berkeley has demonstrated two advantages of hadrons beams: the Relative Biologic Effect (the RBE) and the ballistic of the beams. Since 1994, the clinical centre at Chiba, has demonstrated successfully the applicability of the method. A physics group, managed by G. Kraft, at Darmstadt in Germany, has underlined the advantages of carbon beams. An European pool, called ENGIGHT (European Network for LIGHt ion Therapy) has been created in which the French ETOILE project appeared. The purpose of the thesis concerns measurements and models of 'in vitro' human cells survival. In the first part, the nowadays situation in particles interactions, tracks and cells structures and radiobiology is presented here. The second is devoted to the models based on the beam tracks and localization of the physical dose. Discussion of sensitivity to various parameters of the model has been realized with the help of numerical simulations. Finally the predictions of the improved model has been compared to experimental irradiations of human cells with argon and carbon beams of the GANIL machine. Conclusion of such study shows the performance and limits of a local model for predicting the radiobiological efficiency of light ions in hadron-therapy. (author)

  3. Project of compact accelerator for cancer proton therapy; Progetto di acceleratore compatto per terapia oncologica con protoni (TOP)

    Energy Technology Data Exchange (ETDEWEB)

    Picardi, L; Ronsivalle, C; Vignati, A [ENEA, Cntro Ricerche Frascati, Rome (Italy). Dip. Innovazione

    1995-04-01

    The status of the sub-project `Compact Accelerator` in the framework of the Hadrontherapy Project leaded by Prof. Amaldi is described. Emphasis is given to the reasons of the use of protons for radiotherapy applications, to the results of the preliminary design studies of four types of accelerators as possible radiotherapy dedicated `Compact Accelerator` and to the scenario of the fonts of financial resources.

  4. 'Riesenrad' ion gantry for hadrontherapy: Part III

    International Nuclear Information System (INIS)

    Benedikt, M.; Bryant, P.; Holy, P.; Pullia, M.

    1999-01-01

    When using accelerator beams for cancer therapy, the three-dimensional freedom afforded by a gantry helps the treatment planner to spread out surface doses, avoid directions that intercept vital organs and irradiate a volume that is conformal with the tumour. The general preference is for an iso-centric gantry turning 360 deg. in the vertical plane around the patient bed with sufficient space to be able to orientate the patient through 360 deg. in the horizontal plane. For hadrontherapy, gantries are impressive structures of the order of 10 m in diameter and 100 ton in weight and to date only proton gantries have been demonstrated to operate satisfactorily. The increased magnetic rigidity of say carbon ions will make ion gantries more difficult and costly to build. For this reason, exo-centric gantries and, in particular the so-called 'Riesenrad' gantry with a single 90 deg. bending magnet, merit further attention. The power consumption is reduced and the heavy magnets with their counterbalance weight are reduced and are kept close to the axis. The treatment room, which is lighter, is positioned at a larger radius, but only the patient bed requires careful alignment. An optics module called a 'rotator' is needed to match an incoming dispersion vector to the gantry in order to have an achromatic beam at the patient. A practical design is described that assumes the beam is derived from a slow-extraction scheme in a synchrotron and that the beam sizes are controlled by modules in the transfer line. Magnetic scanning is integrated into the gantry optics for both transverse directions

  5. `Riesenrad' ion gantry for hadrontherapy: Part III

    Science.gov (United States)

    Benedikt, M.; Bryant, P.; Holy, P.; Pullia, M.

    1999-07-01

    When using accelerator beams for cancer therapy, the three-dimensional freedom afforded by a gantry helps the treatment planner to spread out surface doses, avoid directions that intercept vital organs and irradiate a volume that is conformal with the tumour. The general preference is for an iso-centric gantry turning 360° in the vertical plane around the patient bed with sufficient space to be able to orientate the patient through 360° in the horizontal plane. For hadrontherapy, gantries are impressive structures of the order of 10 m in diameter and 100 ton in weight and to date only proton gantries have been demonstrated to operate satisfactorily. The increased magnetic rigidity of say carbon ions will make ion gantries more difficult and costly to build. For this reason, exo-centric gantries and, in particular the so-called `Riesenrad' gantry with a single 90° bending magnet, merit further attention. The power consumption is reduced and the heavy magnets with their counterbalance weight are reduced and are kept close to the axis. The treatment room, which is lighter, is positioned at a larger radius, but only the patient bed requires careful alignment. An optics module called a `rotator' is needed to match an incoming dispersion vector to the gantry in order to have an achromatic beam at the patient. A practical design is described that assumes the beam is derived from a slow-extraction scheme in a synchrotron and that the beam sizes are controlled by modules in the transfer line. Magnetic scanning is integrated into the gantry optics for both transverse directions.

  6. Prompt-gamma detection towards absorbed energy monitoring during hadrontherapy

    Energy Technology Data Exchange (ETDEWEB)

    Krimmer, J.; Balleyguier, L.; Dauvergne, D.; Mathez, H.; Pinto, M.; Testa, E.; Zoccarato, Y. [Institut de Physique Nucleaire de Lyon, Universite de Lyon, Universite de Lyon 1, IN2P3/CNRS, UMR 5822, F-69622 Villeurbanne cedex (France); Krimmer, J.; Freud, N.; L' etang, J.M. [Universite de Lyon, CREATIS, CNRS UMR 5220, Inserm U1044, INSA - Lyon, Universite Lyon 1, Centre Leon Berard (France); Herault, J.; Amblard, R.; Angellier, G. [Centre Antoine Lacassagne, Cyclotron Biomedical, 227 Avenue de la Lanterne, 06200 Nice (France)

    2015-07-01

    Hadrontherapy is an emerging technique which exploits the fact that a large quantity of the energy of the incident particles is deposited at the end of their flight path. This allows a conformation of the applied dose to the tumor volume and a simultaneous sparing of surrounding healthy tissue. A real-time control of the ion range during the treatment is possible via the detection of prompt secondary radiation (gamma rays or charged particles). Besides a monitoring of the ion range, the knowledge of the total energy absorbed inside the patient is also of importance for an improvement of the treatment quality. It has been shown that the ambient dose in a treatment room is correlated to the monitoring units, i.e. the number of protons of the beam delivery system. The present study consists in applying time-of-flight (TOF) information to identify prompt gamma-rays generated by interactions inside the patient which provides a direct information on the energy imparted. Results from test measurements will be given, which show that events generated in the nozzle and the target phantom can be discriminated. Furthermore, a standalone detection system is being developed which will be read out by a standard PC. The status of the developments for the corresponding electronics will be presented. (authors)

  7. [Update of clinical programs using hadrontherapy 2008-2012].

    Science.gov (United States)

    Habrand, J-L; Datchary, J; Alapetite, C; Bolle, S; Calugaru, V; Feuvret, L; Helfre, S; Stefan, D; Delacroix, S; Demarzi, L; Dendale, R

    2013-10-01

    Hadrontherapy, a type of radiation therapy dealing with heavy charged particles, has become for the past decade one of the most sophisticated and attractive approach in the management of cancer. This is related with major technological innovations that have made available, at a relatively cheap cost, compact proton accelerators equipped with rotational gantries. The implementation of pencil beam scanning should also make treatment planning and delivery much easier and faster than conventional approaches. Until now, approximately 100,000 patients have been treated with protons worldwide. Due to more complex technological and biological challenges, light ion therapy - mainly carbon ions - has developed at a lower pace, except in Japan where most of the 15,000 treated patients have been enrolled. Current indications for protons include firstly, locally aggressive tumours non or incompletely resected, that are located close to critical normal structures: ocular melanomas, skull base and spinal canal low grade sarcomas, selected ENT carcinomas (like adenoid cystic); secondly, improvement of tolerance to radiations: delayed, mainly in paediatric malignancies, due to the exquisite sensitivity of organs under development (including to carcinogenesis); immediate, on bone marrow, mucosae… mainly in concomitant radiation-chemotherapy interactions (tested in esophagus, and lung). Most promising indications for carbon ions include inoperable highly radioresistant primaries, such as mucosal melanomas, high grade bone and soft part sarcomas, and pancreatic carcinomas. Altered fractionations are also of interests that could translate in clinical and economical benefits. Controversies have risen whether more common indications, like prostate, should also be explored. Copyright © 2013. Published by Elsevier SAS.

  8. Report `A field test project for the disaster prevention type photovoltaic power generation (Kobe city, Hyogo prefecture)`; `Bosaigata taiyoko hatsuden field test jigyo (Hyogoken Kobeshi)` hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-09-12

    An experiment was conducted on the introduction of the disaster prevention type photovoltaic power system provided with storage batteries to public facilities, etc., considering not only the use of new energy from the environmental aspect, but the emergency use. In fiscal 1995, 5kW-output photovoltaic power systems were installed on the rooftop of Hiyodori and Takamaru regional welfare centers and a 30kW photovoltaic power system on the rooftop of the Hyogo Ward Office. Demonstrative tests of these systems started for collection of various data. Now that the systems were installed at the regional welfare center managed mostly by regional citizens and the ward office which is an administrative office familiar with regional residents, the understanding of and familiarity with the photovoltaic power system were obtained from regional residents, and also people were enlightened on the use of solar energy in such a point as economization of power rates using the interconnected power system. Further, for life supports, it was made possible to secure minimum electric power in emergency and to secure functions of disaster prevention spots. 3 figs.

  9. Preliminary Characterization Tests of Detectors of on-Line Monitor Systems of the Italian National Center of Oncological Hadron-Therapy (CNAO

    Directory of Open Access Journals (Sweden)

    Abdolkazem Ansarinejad

    2013-03-01

    Full Text Available Introduction Hadron-therapy is an effective technique used to treat tumors that are located between or nearby vital organs. The Italian National Center of Oncological Hadron-therapy (CNAO has been realized as the first facility in Italy to treat very difficult tumors with protons and Carbon ions. The on-line monitor system for CNAO has been developed by the Department of Physics of the University of Torino and Italian National Institute of Nuclear Physics (INFN. The monitoring system performs the on-line checking of the beam intensity, dimension, and beam position. Materials and Methods The monitor system is based on parallel plate ionization chambers and is composed of five ionization chambers with the anodes fully integrated or segmented in pixels or strips that are placed in two boxes. A series of measurements were performed that involve the background current and the detectors have been characterized by means of a series of preliminary testes in order to verify reproducibility and uniformity of the chambers using an X-ray source. Results The measured background currents for StripX, StripY and Pixel chambers are five orders of magnitude smaller than the nominal treatment current. The reproducibility error of chambers is less than 1%. The analysis of the uniformity showed that the monitor devices have a spread in gain that varies, but only about 2%. Conclusion The reproducibility and the uniformity values are considered as a good result, taking into account that the X-ray energy range is several orders of magnitude smaller than the particle energies used at CNAO.

  10. Performance test of electron cyclotron resonance ion sources for the Hyogo Ion Beam Medical Center

    Science.gov (United States)

    Sawada, K.; Sawada, J.; Sakata, T.; Uno, K.; Okanishi, K.; Harada, H.; Itano, A.; Higashi, A.; Akagi, T.; Yamada, S.; Noda, K.; Torikoshi, M.; Kitagawa, A.

    2000-02-01

    Two electron cyclotron resonance (ECR) ion sources were manufactured for the accelerator facility at the Hyogo Ion Beam Medical Center. H2+, He2+, and C4+ were chosen as the accelerating ions because they have the highest charge to mass ratio among ion states which satisfy the required intensity and quality. The sources have the same structure as the 10 GHz ECR source at the Heavy Ion Medical Accelerator in Chiba except for a few improvements in the magnetic structure. Their performance was investigated at the Sumitomo Heavy Industries factory before shipment. The maximum intensity was 1500 μA for H2+, 1320 μA for He2+, and 580 μA for C4+ at the end of the ion source beam transport line. These are several times higher than required. Sufficient performance was also observed in the flatness and long-term stability of the pulsed beams. These test results satisfy the requirements for medical use.

  11. Measurement of indoor radon Concentrations in Osaka, Nara, Wakayama and Hyogo with passive dosemeters

    International Nuclear Information System (INIS)

    Mori, Toshiaki; Hori, Yasuharu; Takeda, Atsuhiko; Iwasaki, Tamiko; Uchiyama, Masahumi; Fujimoto, Kenzo; Kankura, Takako; Kobayashi, Sadayosi.

    1989-01-01

    Indoor radon concentrations of 792 houses in Osaka, Nara, Wakayama and Hyogo were measured by the passive dosemeter which was developed in Karlsruhe Nuclear Research Center in West Germany. Each house was measured at two places for successive two periods of six months to obtain annual average exposure due to radon daughters. The arithmetic mean concentration of all houses was 45.2 Bq/m 3 with a standard deviation of 27.2; the geometric mean, 40.7 Bq/m 3 and the median, 39 Bq/m 3 . The distribution of the radon levels was approximately log-normal with 80% of houses having radon concentrations less than 60 Bq/m 3 . The seasonal variation of the mean radon concentration was evident between the former period including winter value of 45 Bq/m 3 and the latter including summer value of 32 Bq/m 3 . The indoor radon concentrations of wooden houses were found to have the widest distribution with the highest value of 371 Bq/m 3 . The highest value obtained in the ferro-concrete house was 118 Bq/m 3 . Twelve houses having indoor radon concentrations higher than 120 Bq/m 3 were all Japanese traditional wooden houses with walls made of soil. (author)

  12. Report of preliminary investigations on the next-generation large-scale synchrotron radiation facility projects

    International Nuclear Information System (INIS)

    1990-01-01

    The Special Committee for Future Project of the Japanese Society for Synchrotron Radiation Research investigated the construction-projects of the large-scaled synchrotron radiation facilities which are presently in progress in Japan. As a result, the following both projects are considered the very valuable research-project which will carry the development of Japan's next-generation synchrotron radiation science: 1. the 8 GeV synchrotron radiation facilities (SPring-8) projected to be constructed by Japan Atomic Energy Research Institute and the Institute of Physical and Chemical Research under the sponsorship of Science Technology Agency at Harima Science Park City, Hyogo Pref., Japan. 2. The project to utilize the Tristan Main Ring (MR) of the National Laboratory for High Energy Physics as the radiation source. Both projects are unique in research theme and technological approach, and complemental each other. Therefore it has been concluded that both projects should be aided and ratified by the Society. (M.T.)

  13. "1"2C fragmentation on thin targets at 95 MeV/A study for hadrontherapy

    International Nuclear Information System (INIS)

    Dudouet, Jeremie

    2014-01-01

    The nuclear models need to be improved in order to reach the required accuracy for a reference simulation code for hadrontherapy. In this context, two experiments have been performed by our collaboration on May 2011 and September 2013 at GANIL to study nuclear reactions of 95 MeV/u "1"2C ions on thin targets of medical interest to measure the double differential fragmentation cross sections of each produced isotope. These experimental data have been compared with Monte-Carlo simulations. Different nuclear models provided by the GEANT4 simulation toolkit have firstly been tested. These simulations revealed discrepancies up to one order of magnitude. The phenomenological model HIPSE has then been used and has shown that the overlapping region of two colliding nuclei needs to be taken into account in order to reproduce the kinematics of the emitted fragments at intermediates energies. Due to the difficulties encountered by these models in the data reproduction, a new model is currently under development: SLIIPIE. This one is a semi-microscopic model, built from a participant-spectator geometrical approach. This model was also compared to the experimental data for "1"2C+"1"2C reactions at 95 MeV/A giving promising results. (author) [fr

  14. Report on proton therapy according to good clinical practice at Hyogo Ion Beam Medical Center

    International Nuclear Information System (INIS)

    Murakami, Masao; Kagawa, Kazufumi; Hishikawa, Yoshio; Abe, Mitsuyuki

    2002-01-01

    The Hyogo Ion Beam Medical Center (HIBMC) is a hospital-based charged particle treatment facility. Having two treatment ion beams (proton and carbon) and five treatment rooms, it is a pioneer among particle institutes worldwide. In May 2001, proton therapy was started as a clinical study for patients with localized cancer originating in the head and neck, lung, liver, and prostate. The aim of this study was to investigate the safety, effectiveness, and stability of the treatment units and systems based on the evaluation of acute toxicity, tumor response, and working ratio of the machine, respectively. Six patients, including liver cancer in three, prostate cancer in two, and lung cancer in one, were treated. There was no cessation of therapy owing to machine malfunction. Full courses of proton therapy consisting of 154 portals in all six patients were given exactly as scheduled. None of the patients experienced severe acute reactions of more than grade 3 according to NCI-CTC criteria. Tumor response one month post-treatment was evaluable in five of the six patients, and was CR in 1 (prostate cancer), PR in 2 (lung cancer: 1, liver cancer: 1), and NC in 2 (liver cancer: 2). These results indicate that our treatment units and systems are safe and reliable enough for proton irradiation to be used for several malignant tumors localized in the body. (author)

  15. Hadrons accelerators in the cancer therapy

    International Nuclear Information System (INIS)

    Amaldi, U.; Silari, M.

    1998-01-01

    The use of hadrons accelerators ( protons and light ions) in the cancer therapy is tackled. After shorts introductory words about the medical reasons in favour of using charged heavy particles radiotherapy, an overall idea is given on the accelerators technology and on the guiding and focusing systems. The Italian project of hadron-therapy (the most important project of this kind in Europe) is introduced, with in reference the National Oncological Center of Hadron-therapy and the plans of two kinds of compact protons accelerators in order to introduce the therapy with protons in a great number of hospitals. Finally, the needs in radiation protection are discussed. (N.C.)

  16. Hadron accelerators in cancer therapy

    International Nuclear Information System (INIS)

    Amaldi, U.; Silari, M.

    1997-01-01

    The application of hadron accelerators (protons and light ions) in cancer therapy is discussed. After a brief introduction on the rationale for the use of heavy charged particles in radiation therapy, a discussion is given on accelerator technology and beam delivery systems. Next, existing and planned facilities are briefly reviewed. The Italian Hadrontherapy Project (the largest project of this type in Europe) is then described, with reference to both the National Centre for Oncological Hadrontherapy and the design of two types of compact proton accelerators aimed at introducing proton therapy in a large number of hospitals. Finally, the radiation protection requirements are discussed. (author)

  17. Family size preference and factors affecting the fertility rate in Hyogo, Japan.

    Science.gov (United States)

    Matsumoto, Yasuyo; Yamabe, Shingo

    2013-01-30

    Japan has consistently shown a low fertility rate, which has been lower than the replacement level since 1974, and represents one of the least fertile countries in the world. This study was designed to determine the family size preference of and its effect on Japanese women. We conducted a questionnaire survey among women who visited the obstetrics and gynecology department of 18 hospitals and clinics in the Hyogo Prefecture, Japan, between October 2011 and February 2012. All the women were categorized according to age group and area of residence, and the survey results were statistically analyzed using a t test. A total of 1616 women were included in this study. There was no significant difference between the mean desired and actual marital ages (26.70 and 26.67 years, respectively). The mean desired number of children was 2.55, which was significantly more than the mean actual number of children (1.77) in all generations. The mean desired and actual numbers of children were more in the rural areas (2.73 and 2.09, respectively) than in the urban (2.54 and 1.70, respectively) and semi-urban areas (2.49 and 1.60, respectively). The mean number of family members was significantly greater in the rural areas (3.84) than in the urban (3.25) and semi-urban areas (3.05).The most important concern among women who had never delivered a baby was childbearing itself, followed by the expenses related to pregnancy and childbearing. The family size preference of the women in our study was higher than the actual numbers of children. The fertility intentions were low among the younger women but high among those living in rural areas with larger families.

  18. International Linear Collider Project and civil engineering technology

    International Nuclear Information System (INIS)

    2007-01-01

    The objectives, activities and members of the Linear Collider Subcommittee of Japan Society of Civil Engineers (LC subcommittee) are described. The LC subcommittee consisted of five working groups such as the working group on planning and project and management, working group on geological survey, test, and environmental design, working group on structural and environmental design, working group on construction and maintenance and working group on information investigation of ILC. The policy of activities, work schedule, and report of each working group are described. Construction of ILC research facilities, standard cross section of tunnel, measurement results of long-term displacement of large underground cavities, the tunnel damages by earthquake in the south part of Hyogo prefecture in Japan, TBM method, collection of information are reported. (S.Y.)

  19. BIANCA, a biophysical model of cell survival and chromosome damage by protons, C-ions and He-ions at energies and doses used in hadrontherapy

    Science.gov (United States)

    Pietro Carante, Mario; Aimè, Chiara; Tello Cajiao, John James; Ballarini, Francesca

    2018-04-01

    An upgraded version of the BIANCA II biophysical model, which describes more realistically interphase chromosome organization and the link between chromosome aberrations and cell death, was applied to V79 and AG01522 cells exposed to protons, C-ions and He-ions over a wide LET interval (0.6–502 keV µm‑1), as well as proton-irradiated U87 cells. The model assumes that (i) ionizing radiation induces DNA ‘cluster lesions’ (CLs), where by definition each CL produces two independent chromosome fragments; (ii) fragment (distance-dependent) mis-rejoining, or un-rejoining, produces chromosome aberrations; (iii) some aberrations lead to cell death. The CL yield, which mainly depends on radiation quality but is also modulated by the target cell, is an adjustable parameter. The fragment un-rejoining probability, f, is the second, and last, parameter. The value of f, which is assumed to depend on the cell type but not on radiation quality, was taken from previous studies, and only the CL yield was adjusted in the present work. Good agreement between simulations and experimental data was obtained, suggesting that BIANCA II is suitable for calculating the biological effectiveness of hadrontherapy beams. For both V79 and AG01522 cells, the mean number of CLs per micrometer was found to increase with LET in a linear-quadratic fashion before the over-killing region, where a less rapid increase, with a tendency to saturation, was observed. Although the over-killing region deserves further investigation, the possibility of fitting the CL yields is an important feature for hadrontherapy, because it allows performing predictions also at LET values where experimental data are not available. Finally, an approach was proposed to predict the ion-response of the cell line(s) of interest from the ion-response of a reference cell line and the photon response of both. A pilot study on proton-irradiated AG01522 and U87 cells, taking V79 cells as a reference, showed encouraging

  20. Optimisation of time resolution in Positron Emission Tomography dedicated to dose control in hadron-therapy

    International Nuclear Information System (INIS)

    Joly, Baptiste

    2010-01-01

    Hadron-therapy is a tumor treatment technique based on irradiation by ions beams. The dose distribution can be controlled during the treatment by Positron Emission Tomography (PET). Indeed, the nuclear collisions between the incident ions and the target medium produce β + emitters, whose spatial distribution is correlated to the dose distribution. However, this application of PET suffers from a low β + activity, a high parasitic activity, and requires fast reconstruction. The Time-Of-Flight technique appears as a key factor to make the in beam PET technique feasible. This work starts from a front-end concept based on fast digital sampling of the detector signals and digital processing for energy and time extraction. The statistical limitations to time resolution determined by the scintillation process are first examined. An experimental set-up with two scintillation detectors in coincidence is then used to test various algorithms: digital discriminators (leading-edge, constant fraction), and filters (least squares, optimal filter, low-pass interpolating filter). The timing performances of all the algorithms are very similar, except the least squares filter, which is not adapted to the non-stationary noise conditions resulting from the scintillation process. Various scintillator materials and configurations are tested, confirming the importance of light yield, scintillation time constants and photodetector response. An avalanche photodiode detector is tested and used for a multichannel demonstrator, which will be used for in-beam tests. (author)

  1. Role of Leading Programs in Doctoral Education: A New Type of Leadership Education in the Sciences at University of Hyogo, Japan

    Directory of Open Access Journals (Sweden)

    Maya Okamoto

    2015-01-01

    Full Text Available Fostering global leaders for the next generation is an important mission of universities. In Japan, Leading Programs in Doctoral Education (LP has been implemented in many graduate schools. The main goal of this program is to foster PhDs with deep specialization and peer leadership who will be able to compete well internationally. The Graduate School of Life Science, University of Hyogo is implementing a LP to foster global leaders using cutting-edge technology. They are also trying to create new evaluation criteria of human resource development with their corporate sponsors. The success of LP depends not only on how many graduates can play leading roles globally, but also how university staff can create a superior new evaluation criteria of human resource development and how much it can be shared with universities and industry. Development of students and graduates with a high level of ability takes time, thus it is important to consider the continuous development of LP.

  2. Hadron accelerators in medicine

    International Nuclear Information System (INIS)

    Amaldi, U.

    1996-01-01

    The application of hadron accelerators (protons and light ions) in cancer therapy is discussed. After a brief introduction on the rationale for the use of heavy charged particles in radiation therapy, a discussion is given on accelerator technology and beam delivery systems. Next, existing and planned facilities are briefly reviewed. The Italian Hadron-therapy Project is then described in some detail, with reference ro both the National Centre for Oncological Hadron-therapy and the design of different types of compact proton accelerators aimed at introducing proton therapy in a large umber of hospitals. (author)

  3. ENLIGHT Network

    CERN Multimedia

    Ballantine, A; Dixon-Altaber, H; Dosanjh, M; Kuchina, L

    2011-01-01

    State-of-the-art techniques borrowed from particle accelerators and detectors are a key element in hadrontherapy and several European projects are actively fostering the collaboration amongst the various disciplines and countries. ENLIGHT was established in 2002 to coordinate these European efforts in hadron therapy. The ENLIGHT network is formed by the European hadrontherapy Community, with more than 300 participants from twenty European countries. A major achievement of ENLIGHT has been the blending of traditionally separate communities so that clinicians, physicists, biologists and engineers with experience and interest in particle therapy are working together.

  4. Influence of the chemical composition of human tissues on dose distributions in hadron-therapy

    International Nuclear Information System (INIS)

    Batin, E.

    2008-06-01

    To compute the dose distribution, treatment planning systems require the exact anatomical location of tissues provided by computed tomography (CT) and the exact range of hadron beams in tissues based on the water equivalent ratio (WER). Since CT numbers are determined with x-rays and with an energy different from that used in hadron-therapy, a relation between CT numbers and the WER must to be established. We propose a determination of the WER with a Monte-Carlo simulation (GEANT4). We have determined the WER for 76 human tissues for a 135 MeV proton beam and for a 290 MeV/A carbon beam. The difference between the stoichiometric calibration and the simulated WER is lower than 1%. An additional 2% uncertainty that arises from the uncertainty in the CT numbers measurement should also be considered. The calculated WER were used to convert the deposited energy curve into the human tissue deposited energy curve for a 135 MeV proton beam and for a 290 MeV/A carbon beam. For both beams, the difference between the rescaled Bragg peak location and the one from the simulated curve is lower than 0.5 mm over the whole range of CT numbers. The differences between the maximum deposited energy can reach 3% for the proton beam in bones and vary between 1.5% and 3.5% for all tissues for the carbon beam. The scaling in two dimensions can be improved by using an additional factor that takes the scattering into account. (author)

  5. Study of fragmentation cross-sections for 12C+12C reaction at 95 MeV/u and 400 MeV/u for hadron-therapy

    International Nuclear Information System (INIS)

    Juliani, Didier

    2013-01-01

    The hadron-therapy is a radiotherapy method using ions (carbon ions here) instead of the more conventional X-rays for cancer treatment. Deep radioresistant tumour areas, as brain carcinoma for example, can be treated thanks to the specific dose deposition at the end of the ion path. This is an additional method to older classic ones (surgery, X-rays, chemotherapy). Two hadron-therapy centres for treatment and research are planned in France from 2018 (ARCHADE) in order to benefit from the newest progress and to keep improving this method. Carbon ions energy loss in the matter follows the Bethe-Bloch law. The maximum of energy depth is located in a limited area called 'Bragg peak'. By adjusting the beam position and energy, the whole volume of the tumor can be irradiated. Nevertheless, nuclear reactions of carbon ion in tissues generate the production of lighter fragments (H, He, Li etc.) that deposit their energy beyond the Bragg peak. Models implemented in hadron-therapy simulation codes (FLUKA, GEANT4 etc.) cannot reproduce angular distributions of the lighter fragments and energy distributions at the same time. These poor estimations affect the treatment planning systems accuracy that are clinically used. Indeed, a bad estimation of fragmentation process induces a bias in the dose calculation concerning healthy cells beyond the Bragg peak. In order to better constraint models, two experiments based on fragmentation cross-sections measurements have been performed. The first one in may 2011 with a beam at 95 MeV/u (GANIL) in collaboration with the LPC Caen and the second one in august 2011 with a beam at 400 MeV/u (GSI) with the FIRST collaboration. E600 experiment is devoted to the study of carbon ions fragmentation at 95 MeV/u in several thin targets (Au, C, , Ti etc.) corresponding to the basic building blocks of human body. Five telescopes are designed for the fragments detection. Each one is a three-stage detector (2 silicon detectors and one CsI scintillator

  6. Discharge of perfluorinated compounds from rivers and their influence on the coastal seas of Hyogo prefecture, Japan

    International Nuclear Information System (INIS)

    Takemine, Shusuke; Matsumura, Chisato; Yamamoto, Katsuya; Suzuki, Motoharu; Tsurukawa, Masahiro; Imaishi, Hiromasa; Nakano, Takeshi; Kondo, Akira

    2014-01-01

    The aim of this study was to investigate 12 perfluorinated compounds (PFCs) including perfluorinated carboxylates (C4–C12) and perfluorinated alkyl sulfonates (C4, C6, and C8) in river and seawater samples to determine contamination levels in the aquatic environment of Hyogo prefecture, Japan. High levels of perfluorohexanoic acid (PFHxA; 2300–16,000 ng/L) were detected in the Samondogawa River at Tatsumi Bridge downstream of a PFC production facility; this location also had the highest mass flow rate of PFCs (3900–29,000 kg/y). Widespread contamination of coastal waters was confirmed with PFHxA as the dominant compound. Perfluorooctanoic acid was also prevalent in coastal waters. The concentration of PFHxA in coastal seawater and the distance from the mouth of the Samondogawa River were inversely related. This discharge of high concentrations of PFHxA from the Samondogawa River may have affected concentrations of PFCs in Osaka Bay. -- Highlights: • High perfluorohexanoic acid concentration was detected in the Samondogawa River. • The mass flow rate of PFCs in this river section was 3900–29,000 kg/y. • Perfluorohexanoic acid was the dominant compound at all seawater sampling sites. • Perfluorohexanoic acid from the Samondogawa River may have affected Osaka Bay. -- Discharge of perfluorohexanoic acid from the Samondogawa River may have affected Osaka Bay

  7. Measurement of Fragment Production Cross Sections in the $^{12}$C+$^{12}$C and $^{12}$C+$^{197}$Au Reactions at 62 $A$ MeV for Hadrontherapy and Space Radiation Protection

    CERN Document Server

    Tropea, S; Agodi, C; Blancato, A A; Bondì, M; Cappuzzello, F; Carbone, D; Cavallaro, M; Cirrone, G A P; Cuttone, G; Giacoppo, F; Nicolosi, D; Pandola, L; Raciti, G; Rapisarda, E; Romano, F; Sardina, D; Scuderi, V; Sfienti, C

    2014-01-01

    Over the last twenty years, there has been a renewed interest in nuclear fragmentation studies for both hadrontherapy applications and space radiation protection. In both fields, fragmentation cross sections are needed to predict the effects of the ions nuclear interactions within the patient’s and the astronaut’s body. Indeed, the Monte Carlo codes used in planning tumor treatments and space missions must be tuned and validated by experimental data. However, only a limited set of fragmentation cross sections are available in literature, especially at Fermi energies. Therefore, we have studied the production of secondary fragments in the 12 C+ 12 C and 12 C+ 197 Au reactions at 62 A MeV. In this work, the measured 4 He cross sections angular distributions at four selected angles are presented and compared.

  8. Visualization of strong around motion calculated from the numerical simulation of Hyogo-ken Nanbu earthquake; Suchi simulation de miru Hyogoken nanbu jishin no kyoshindo

    Energy Technology Data Exchange (ETDEWEB)

    Furumura, T [Hokkaido Univ. of Education, Sapporo (Japan); Koketsu, K [The University of Tokyo, Tokyo (Japan). Earthquake Research Institute

    1996-10-01

    Hyogo-ken Nanbu earthquake with a focus in the Akashi straits has given huge earthquake damages in and around Awaji Island and Kobe City in 1995. It is clear that the basement structure, which is steeply deepened at Kobe City from Rokko Mountains towards the coast, and the focus under this related closely to the local generation of strong ground motion. Generation process of the strong ground motion was discussed using 2D and 3D numerical simulation methods. The 3D pseudospectral method was used for the calculation. Space of 51.2km{times}25.6km{times}25.6km was selected for the calculation. This space was discretized with the lattice interval of 200m. Consequently, it was found that the basement structure with a steeply deepened basement, soft and weak geological structure thickly deposited on the basement, and earthquake faults running under the boundary of base rock and sediments related greatly to the generation of strong ground motion. Numerical simulation can be expected to predict the strong ground motion by shallow earthquakes. 9 refs., 7 figs.

  9. ULICE Poster

    CERN Multimedia

    Greco, V

    2012-01-01

    The ULICE project was launched in 2009 with the aim to develop appropriate instruments for high-performance hadron-therapy (with a special attention to carbon ion therapy) and to foster the collaboration among existing and future centres. The project is built on 3 pillars: Transnational Access, Joint Research Activities, & Network Activities, each coordinated by a different institution.

  10. Status of the ETOILE centre at the end of 2010

    International Nuclear Information System (INIS)

    Balosso, J.; Pommier, P.; Wasmer, G.

    2011-01-01

    Since its last presentation during the National Institute of Radiological Sciences (NIRS)-ETOILE symposium of March 2009, the ETOILE project went through a series of steps that have altered its general organization but has consolidated its future. Many programmes have been pushed forward altogether, as previously announced. First, the tendering process developed as a tentative public-private partnership reached an unsuccessful end. This decision was made in full agreement with the administrative authorities. Second, the solution to include in the project a high-performance research facility capable of prolonging the present research programmes, as well as to attract and host visiting research teams was greatly improved. A dual-purpose centre, with mutualisation of the costs and resources, is now being proposed: the ETOILE Hadrontherapy Care Centre and the ETOILE Platform for Research and Development in Hadrontherapy (PRDH-ETOILE). This project was warmly welcomed by research and teaching institutions, and industrials. Third, the governmental health authorities gained full and satisfactory information through a long process of evaluation and negotiation and issued, in October 2010, a set of recommendations to go ahead with this solution, among which: the ''green light'', of course, to launch a new tendering process with a public body project ownership; the engagement of the State to create a specific national public health centre to host the care activities and to allow its funding through the health insurance system; the latter clause being granted provided the research part is auto-funded; the agreement to send an increasing number of patients to already existing carbon ion care centres abroad, in order to constitute a cohort of hadrontherapy cases in France, to begin treatments and studies, and later on training for the opening of the Centre. Thus, 2011 should be a very busy, and hopefully successful, year for ETOILE. (author)

  11. Characterization of genome sequences and clinical features of coxsackievirus A6 strains collected in Hyogo, Japan in 1999-2013.

    Science.gov (United States)

    Ogi, Miki; Yano, Yoshihiko; Chikahira, Masatsugu; Takai, Denshi; Oshibe, Tomohiro; Arashiro, Takeshi; Hanaoka, Nozomu; Fujimoto, Tsuguto; Hayashi, Yoshitake

    2017-08-01

    Coxsackievirus A6 (CV-A6) is an enterovirus, which is known to cause herpangina. However, since 2009 it has frequently been isolated from children with hand, foot, and mouth disease (HFMD). In Japan, CV-A6 has been linked to HFMD outbreaks in 2011 and 2013. In this study, the full-length genome sequencing of CV-A6 strains were analyzed to identify the association with clinical manifestations. Five thousand six hundred and twelve children with suspected enterovirus infection (0-17 years old) between 1999 and 2013 in Hyogo Prefecture, Japan, were enrolled. Enterovirus infection was confirmed with reverse transcriptase-PCR in 753 children (791 samples), 127 of whom (133 samples) were positive for CV-A6 based on the direct sequencing of the VP4 region. The complete genomes of CV-A6 from 22 positive patients with different clinical manifestations were investigated. A phylogenetic analysis divided these 22 strains into two clusters based on the VP1 region; cluster I contained strains collected in 1999-2009 and mostly related to herpangina, and cluster II contained strains collected in 2011-2013 and related to HFMD outbreak. Based on the full-length polyprotein analysis, the amino acid differences between the strains in cluster I and II were 97.7 ± 0.28%. Amino acid differences were detected in 17 positions within the polyprotein. Strains collected in 1999-2009 and those in 2011-2013 were separately clustered by phylogenetic analysis based on 5'UTR and 3Dpol region, as well as VP1 region. In conclusion, HFMD outbreaks by CV-A6 were recently frequent in Japan and the accumulation of genomic change might be associated with the clinical course. © 2017 Wiley Periodicals, Inc.

  12. Prevalence of Diarrheagenic Escherichia coli in Foods and Fecal Specimens Obtained from Cattle, Pigs, Chickens, Asymptomatic Carriers, and Patients in Osaka and Hyogo, Japan.

    Science.gov (United States)

    Wang, Lili; Zhang, Shaobo; Zheng, Dongming; Fujihara, Sami; Wakabayashi, Akiyo; Okahata, Kazuyuki; Suzuki, Masakazu; Saeki, Atsunori; Nakamura, Hiromi; Hara-Kudo, Yukiko; Kage-Nakadai, Eriko; Nishikawa, Yoshikazu

    2017-07-24

    The source and routes of diarrheagenic Escherichia coli (DEC) remain poorly understood. To investigate the involvement of domestic animals in the dissemination of DEC, the prevalence of DEC in foods and fecal specimens from cattle, pigs, chickens, healthy carriers, and patients in Osaka and Hyogo, Japan was investigated using a multiplex real-time Polymerase Chain Reaction assay. The most abundant virulence genes were astA and eae, which had a prevalence 46.8% and 27.4%, respectively. Additionally, stx1 (26.6%) and stx2 (45.9%) were prevalent in cattle feces, while est (8.5%) and elt (7.6%) were prevalent in pig feces. afaB was the second-most prevalent gene in patients and healthy carriers, and it had detection rates of 5.1% and 8.1%, respectively. In contrast, afaB was not detected in animal feces or foods, except for three porcine fecal samples. The aggR gene was more prevalent in humans than in foods or animal feces. Both Shiga toxin-producing E. coli and atypical enteropathogenic E. coli carried by cattle may be sources for diarrheal diseases in humans. Pigs may be a source for human enterotoxigenic E. coli infections, whereas humans are expected to be the reservoir for diffusely adhering E. coli, enteroaggregative E. coli, and enteroinvasive E. coli.

  13. Un nouvel espoir pour guérir le cancer

    CERN Multimedia

    Chavas, Jean-Paul

    2006-01-01

    Hadrontherapy, a nano scalpel. Presentation made by Madjid Boutemeur, searcher and professor of atomic, nuclear and particle physics; he presented a new technology coming from the fundamental research and applicable for medicine: hadrontherapy. (1/3 page)

  14. Towards biology-oriented treatment planning in hadrontherapy

    Czech Academy of Sciences Publication Activity Database

    Kundrát, Pavel

    2006-01-01

    Roč. 122, 1-4 (2006), s. 480-482 ISSN 0144-8420 R&D Projects: GA ČR GA202/05/2728 Institutional research plan: CEZ:AV0Z10100502 Keywords : treatment planning * hadron radiotherapy Subject RIV: BF - Elementary Particles and High Energy Physics Impact factor: 0.446, year: 2006

  15. A use of the microdosimetric Kinetic Model (MKM) for the interpretation of cell irradiation in the framework of the hadron-therapy: Application of Monte-Carlo simulations

    International Nuclear Information System (INIS)

    Dabli, Djamel

    2010-01-01

    Hadron-therapy is a cancer treatment method based on the use of heavy charged particles. The physical characteristics of these particles allow more precise targeting of tumours and offer higher biological efficiency than photons and electrons. This thesis addresses the problem of modelling the biological effects induced by such particles. One part of this work is devoted to the analysis of the Monte-Carlo simulation tool-kit 'Geant4' used to simulate the physical stage of the particle interactions with the biological medium. We evaluated the ability of 'Geant4' to simulate the microscopic distribution of energy deposition produced by charged particles and we compared these results with those of another simulation code dedicated to radiobiological applications. The other part of the work is dedicated to the study of two radiobiological models that are the LEM (Local Effect Model) based on an amorphous track structure approach and the MKM (Microdosimetric Kinetic Model) based on microdosimetric approach. A theoretical analysis of both models and a comparison of their concepts are presented. Then we focused on a detailed analysis of the microdosimetric model 'MKM'. Finally, we applied the MKM to reproduce the experimental results obtained at GANIL by irradiation of two tumour cell lines (cell line SCC61 and SQ20B) of different radiosensitivity with carbon and argon ions. (author)

  16. Dosimetric commissioning and quality assurance of scanned ion beams at the Italian National Center for Oncological Hadrontherapy

    Energy Technology Data Exchange (ETDEWEB)

    Mirandola, Alfredo, E-mail: mirandola@cnao.it; Molinelli, S.; Vilches Freixas, G.; Mairani, A.; Gallio, E.; Panizza, D.; Russo, S.; Ciocca, M. [Fondazione CNAO, strada Campeggi 53, Pavia 27100 (Italy); Donetti, M. [INFN, Torino 10125, Italy and Fondazione CNAO, strada Campeggi 53, Pavia 27100 (Italy); Magro, G. [INFN–Dipartimento di Fisica, Università degli Studi di Pavia, Via U. Bassi 6, Pavia 27100, Italy and Fondazione CNAO, strada Campeggi 53, Pavia 27100 (Italy); Giordanengo, S. [INFN, Torino 10125 (Italy); Orecchia, R. [Fondazione CNAO, strada Campeggi 53, Pavia 27100, Italy and Radiotherapy Division, European Institute of Oncology, Via Ripamonti 435, Milano 20141 (Italy)

    2015-09-15

    Purpose: To describe the dosimetric commissioning and quality assurance (QA) of the actively scanned proton and carbon ion beams at the Italian National Center for Oncological Hadrontherapy. Methods: The laterally integrated depth-dose-distributions (IDDs) were acquired with the PTW Peakfinder, a variable depth water column, equipped with two Bragg peak ionization chambers. FLUKA Monte Carlo code was used to generate the energy libraries, the IDDs in water, and the fragment spectra for carbon beams. EBT3 films were used for spot size measurements, beam position over the scan field, and homogeneity in 2D-fields. Beam monitor calibration was performed in terms of number of particles per monitor unit using both a Farmer-type and an Advanced Markus ionization chamber. The beam position at the isocenter, beam monitor calibration curve, dose constancy in the center of the spread-out-Bragg-peak, dose homogeneity in 2D-fields, beam energy, spot size, and spot position over the scan field are all checked on a daily basis for both protons and carbon ions and on all beam lines. Results: The simulated IDDs showed an excellent agreement with the measured experimental curves. The measured full width at half maximum (FWHM) of the pencil beam in air at the isocenter was energy-dependent for both particle species: in particular, for protons, the spot size ranged from 0.7 to 2.2 cm. For carbon ions, two sets of spot size are available: FWHM ranged from 0.4 to 0.8 cm (for the smaller spot size) and from 0.8 to 1.1 cm (for the larger one). The spot position was accurate to within ±1 mm over the whole 20 × 20 cm{sup 2} scan field; homogeneity in a uniform squared field was within ±5% for both particle types at any energy. QA results exceeding tolerance levels were rarely found. In the reporting period, the machine downtime was around 6%, of which 4.5% was due to planned maintenance shutdowns. Conclusions: After successful dosimetric beam commissioning, quality assurance measurements

  17. Dosimetric commissioning and quality assurance of scanned ion beams at the Italian National Center for Oncological Hadrontherapy

    International Nuclear Information System (INIS)

    Mirandola, Alfredo; Molinelli, S.; Vilches Freixas, G.; Mairani, A.; Gallio, E.; Panizza, D.; Russo, S.; Ciocca, M.; Donetti, M.; Magro, G.; Giordanengo, S.; Orecchia, R.

    2015-01-01

    Purpose: To describe the dosimetric commissioning and quality assurance (QA) of the actively scanned proton and carbon ion beams at the Italian National Center for Oncological Hadrontherapy. Methods: The laterally integrated depth-dose-distributions (IDDs) were acquired with the PTW Peakfinder, a variable depth water column, equipped with two Bragg peak ionization chambers. FLUKA Monte Carlo code was used to generate the energy libraries, the IDDs in water, and the fragment spectra for carbon beams. EBT3 films were used for spot size measurements, beam position over the scan field, and homogeneity in 2D-fields. Beam monitor calibration was performed in terms of number of particles per monitor unit using both a Farmer-type and an Advanced Markus ionization chamber. The beam position at the isocenter, beam monitor calibration curve, dose constancy in the center of the spread-out-Bragg-peak, dose homogeneity in 2D-fields, beam energy, spot size, and spot position over the scan field are all checked on a daily basis for both protons and carbon ions and on all beam lines. Results: The simulated IDDs showed an excellent agreement with the measured experimental curves. The measured full width at half maximum (FWHM) of the pencil beam in air at the isocenter was energy-dependent for both particle species: in particular, for protons, the spot size ranged from 0.7 to 2.2 cm. For carbon ions, two sets of spot size are available: FWHM ranged from 0.4 to 0.8 cm (for the smaller spot size) and from 0.8 to 1.1 cm (for the larger one). The spot position was accurate to within ±1 mm over the whole 20 × 20 cm"2 scan field; homogeneity in a uniform squared field was within ±5% for both particle types at any energy. QA results exceeding tolerance levels were rarely found. In the reporting period, the machine downtime was around 6%, of which 4.5% was due to planned maintenance shutdowns. Conclusions: After successful dosimetric beam commissioning, quality assurance measurements

  18. Plasma brain-derived neurotrophic factor concentration is a predictor of chronic kidney disease in patients with cardiovascular risk factors - Hyogo Sleep Cardio-Autonomic Atherosclerosis study.

    Directory of Open Access Journals (Sweden)

    Masafumi Kurajoh

    Full Text Available Brain-derived neurotrophic factor (BDNF has been shown to have protective effects against cardiovascular diseases and death through neural and non-neural pathways via tropomyosin-related kinase B signaling. However, it is not known whether plasma BDNF concentration is a predictor of chronic kidney disease (CKD.This study was conducted as a prospective cohort study as part of the Hyogo Sleep Cardio-Autonomic Atherosclerosis.We measured plasma BDNF concentration in 324 patients without CKD, defined as an estimated glomerular filtration rate (eGFR less than 60 ml/min/1.73m2, and with cardiovascular risk factors. As potential confounders, sleep condition, nocturnal hypertension, and autonomic function were quantitatively examined. The patients were followed for a median 37 months (range 2-59 months and occurrence of CKD was noted.Plasma BDNF concentration was significantly and independently associated with CKD development, which occurred in 38 patients (11.7%. Kaplan-Meier analysis revealed that patients with reduced plasma BDNF concentration exhibited a significantly (p = 0.029 greater number of CKD events as compared to those with a higher concentration. Moreover, comparisons of key subgroups showed that the risk of CKD in association with low plasma BDNF concentration was more prominent in patients with a greater reduction of nocturnal systolic blood pressure, better movement index, higher standard deviations of the NN(RR interval or average NN(RR interval for each 5-minute period, and without past cardiovascular disease events, smoking habit, or albuminuria.Plasma BDNF concentration is an independent predictor for development of CKD in patients with cardiovascular risk factors.

  19. Medical issues and research activity

    International Nuclear Information System (INIS)

    Orecchia, R.; Solcia, E.; Fossati, P.

    2006-01-01

    We want to report on the CNAO Centro Nazionale di Adroterapia Oncologica (National Centre for Oncological Hadrontherapy) Foundation activity aiming to create the clinical conditions that will enable CNAO to work in the most advantageous way. CNAO Foundation is taking care to inform the population, patients and medical community on the existence, potentiality and limits of hadrontherapy. To achieve this goal it has created a website that gives general information on hadrontherapy and a medical service that advises on specific clinical cases; it has moreover promoted seminars and courses for residents and specialists. Disease specific working groups have been created to define protocols on patients selection criteria, indications, dose and fractionation and to design clinical trials that will be carried out at CNAO. These protocols and trials are a working tool that will permit a more rational clinical activity. CNAO Foundation is promoting training of personnel that will work at CNAO and in the next few months physicians and physicists will be send abroad to learn the practical aspects of hadrontherapy in foreign facilities where hadrons are already in clinical use. CNAO Foundation is sponsoring research activity in the fields of precision patient positioning, organ motion management, in vivo dosimetry with in room positron emission tomography (PET) scan and radiobiology. These activities will help to take full advantage of the facility under construction and to better define the role of hadrontherapy in cancer care. (author)

  20. Knowledge management and electronic publishing for the CNAO with EDMS

    International Nuclear Information System (INIS)

    Gerardi, F.; Rademakers-Di Rosa, O.; Rossi, S.

    2001-01-01

    The Italian Government has recently approved the construction of a National Center for Oncological Hadrontherapy (CNAO). TERA (Foundation for Oncological Hadrontherapy) will lead the high technology projects of the CNAO, whose machine design is a spin-off to the medical world of the collaboration with CERN. The CERN EDMS (Engineering Data Management System) was initially launched at CERN to support the LHC project but has since become a general service available for all divisions and recognized experiments. As TERA is closely associated to CERN, TERA decided to profit from EDMS and to use it to support the ambitious Quality Assurance plan for the CNAO project. With this EDMS project TERA transfers know-how that has been developed in the HEP Community to a social sector of major importance that also has high-density information management needs. The features available in the CERN EDMS system provide the tools for managing the complete lifecycle of any technical document including a distributed approval process and a controlled distributed collaborative work environment using the World Wide Web. The system allows management of structures representing projects and relative documents including drawings within working contexts and with a customisable release procedure. TERA is customizing CERN EDMS to document the CNAO project activities, to ensure that the medical accelerator and its auxiliary installations can be properly managed throughout its lifecycle, from design to maintenance and possibly dismantling. The technical performance requirements of EDMS are identical to those for LHC and CERN in general. The authors will describe what they have learned about how to set-up an EDMS project, and how it benefits a challenging initiative like the CNAO Project of the TERA collaboration. The knowledge managed by the system will facilitate later installations of similar centers (planned for Lyon and Stockholm) and will allow the reuse of experience gained in Italy

  1. Application of passive type radon detectors to find fissures in banks caused by the southern Hyogo prefectural earthquake in Japan

    International Nuclear Information System (INIS)

    Saegusa, J.; Yamasaki, K.; Tsujimoto, T.; Morishima, H.; Shimo, M.; Murakami, A.; Hasegawa, T.

    1996-01-01

    Innumerable fissures were formed widely in Hanshin area in Japan by the former southern Hyogo prefectural earthquake occurred on Jan.17, 1995. In this study, as a preliminary investigation, we applied passive type radon detector Pico-Rad (U.S. Packard Instrument Co. Ltd.) with hemispheric plastic cover over them around the fissure along on the bank of two reservoirs to examine whether there is possibility to find fissures using the characteristics of 222 Rn migration. One of the reservoir, Taniyamakami-ike, is located at the north of the Awaji-shima island at a distance of about 4 km from the seismic center of this earthquake. On the whole, 222 Rn exhalation rates were high on a line of 2 m below the edge of the bank and got lower in proportion to the distance from this line. Those top of the bank had middle values among the lines. The mean 222 Rn exhalation rate was 4.7 mBq m -2 s -1 , and in these data we found some singularly high 222 Rn points. The other reservoir named Hosho-ike is located at northwestern Nagaokakyo city of Kyoto prefecture and the Komyoji active faulting runs from north to south parallel with the bank about 120 m to the west. In this bank, a fissure about 50 m in length and 0.1 m in width was taken shape. 222 Rn exhalation rates were relatively high on the top of the bank compared with on the slope of the bank. The mean 222 Rn exhalation rate of 5 points which were measured on the fissure was 16 mBq m -2 s -1 , and that which were measured on about 1 m to the east from the fissure was 4.9 mBq m -2 s -1 and in case about 1 m to the west was 4.2 mBq m -2 s -1 . From these results we concluded that there is a possibility to find fissures inside the bank using the characteristics of 222 Rn migration. Our future objective is to find fissures inside banks non-destructively. (author)

  2. Medical Applications

    OpenAIRE

    Biscari, C.; Falbo, L.

    2016-01-01

    The use of accelerators for medical applications has evolved from initial experimentation to turn-key devices commonly operating in hospitals. New applications are continuously being developed around the world, and the hadrontherapy facilities of the newest generation are placed at the frontier between industrial production and advanced R&D. An introduction to the different medical application accelerators is followed by a description of the hadrontherapy facilities, with special emphasis on ...

  3. ELIMED, future hadrontherapy applications of laser-accelerated beams

    Czech Academy of Sciences Publication Activity Database

    Cirrone, Giuseppe A.P.; Carpinelli, M.; Cuttone, G.; Gammino, S.; Jia, S.B.; Korn, Georg; Maggiore, Mario; Manti, L.; Margarone, Daniele; Prokůpek, Jan; Renis, M.; Romano, F.; Schillaci, Francesco; Tomasello, B.; Torrisi, L.; Tramontana, A.; Velyhan, Andriy

    2013-01-01

    Roč. 730, Dec (2013), s. 174-177 ISSN 0168-9002. [International Conference on Radiation Effects on Semiconductor Materials, Detectors and Devices /9./(RESMDD). Florence, 09.10.2012-12.10.2012] R&D Projects: GA ČR(CZ) GAP205/11/1165; GA MŠk ED1.1.00/02.0061; GA MŠk EE.2.3.20.0087 Grant - others:ELI Beamlines(XE) CZ.1.05/1.1.00/02.0061; OP VK 2 LaserGen(XE) CZ.1.07/2.3.00/20.0087 Institutional support: RVO:68378271 Keywords : laser acceleration * cancer treatment * particle selection * Monte Carlo simulation * beam handling Subject RIV: BH - Optics, Masers, Lasers Impact factor: 1.316, year: 2013

  4. Performance of the reconstruction algorithms of the FIRST experiment pixel sensors vertex detector

    CERN Document Server

    Rescigno, R; Juliani, D; Spiriti, E; Baudot, J; Abou-Haidar, Z; Agodi, C; Alvarez, M A G; Aumann, T; Battistoni, G; Bocci, A; Böhlen, T T; Boudard, A; Brunetti, A; Carpinelli, M; Cirrone, G A P; Cortes-Giraldo, M A; Cuttone, G; De Napoli, M; Durante, M; Gallardo, M I; Golosio, B; Iarocci, E; Iazzi, F; Ickert, G; Introzzi, R; Krimmer, J; Kurz, N; Labalme, M; Leifels, Y; Le Fevre, A; Leray, S; Marchetto, F; Monaco, V; Morone, M C; Oliva, P; Paoloni, A; Patera, V; Piersanti, L; Pleskac, R; Quesada, J M; Randazzo, N; Romano, F; Rossi, D; Rousseau, M; Sacchi, R; Sala, P; Sarti, A; Scheidenberger, C; Schuy, C; Sciubba, A; Sfienti, C; Simon, H; Sipala, V; Tropea, S; Vanstalle, M; Younis, H

    2014-01-01

    Hadrontherapy treatments use charged particles (e.g. protons and carbon ions) to treat tumors. During a therapeutic treatment with carbon ions, the beam undergoes nuclear fragmentation processes giving rise to significant yields of secondary charged particles. An accurate prediction of these production rates is necessary to estimate precisely the dose deposited into the tumours and the surrounding healthy tissues. Nowadays, a limited set of double differential carbon fragmentation cross-section is available. Experimental data are necessary to benchmark Monte Carlo simulations for their use in hadrontherapy. The purpose of the FIRST experiment is to study nuclear fragmentation processes of ions with kinetic energy in the range from 100 to 1000 MeV/u. Tracks are reconstructed using information from a pixel silicon detector based on the CMOS technology. The performances achieved using this device for hadrontherapy purpose are discussed. For each reconstruction step (clustering, tracking and vertexing), different...

  5. Joint research achievement report on field test project for photovoltaic power generation of industrial use in fiscal 2000 (5/5); 2000 nendo sangyo tou you taiyokohatsuden field test jigyo kyodo kenkyu seika hokokusho 5/5

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-05-01

    This paper summarizes the achievements in fiscal 2000 on the field tests for photovoltaic power generation of industrial use. This report describes the details of the achievements on the following organizations: the Hiroshima Riverside Hotel; the Saraya Corporation; the Nanshin Subaru Corporation; the Ricoh Uni-techno Corporation; Toyota Motors Kyushu Corporation (Eco-center); Hitachi Electric Wires; Yuasa Corporation, Furukawa City in Ibaraki Prefecture; the Takasaki Branch Office of East Japan Passenger Railways; the World Trade Center Building, the Minami Trading Company, Onga Township in Fukuoka Prefecture; the Keio Electric Railways (Wakabadai Station); the Business Enterprise Bureau of Kyoto Prefectural Government; Okinawa Electric Power (Kita-Daito Island), Kawagoe Township in Mie Prefecture, the Keio Electric Railways (Meidai-mae Station); Kitakata Township in Gifu Prefecture; the Yamaguchi Prefectural Government; the MSK Corporation; the Fuji Pream Corporation; Kumano Township in Hiroshima Prefecture; Fukuroi City in Shizuoka Prefecture; the Water Supply Bureau of Yokohama Municipality in Kanagawa Prefecture; Ashiya City in Hyogo Prefecture; Shinoyama City in Hyogo Prefecture; the Gantan Beauty Industry; the Toyokuni Industry; and Minoo City in Osaka Prefecture. (NEDO)

  6. On the fault system and basement structure in and around the epicentral region of the 1995 Hyogo-ken Nanbu earthquake; 1995 nen Hyogoken nanbu jishin shingen shuhen no danso kiso kozo ni tsuite

    Energy Technology Data Exchange (ETDEWEB)

    Yokokura, T; Kano, N; Yamaguchi, K; Miyazaki, T [Geological Survey of Japan, Tsukuba (Japan); Ikawa, T; Ota, Y; Kawanaka, T [Japex Jeoscience Institute, Tokyo (Japan)

    1996-05-01

    A reflection elastic wave seismic survey was carried out as part of the emergency survey of active faults in relation with the Hyogo-ken Nanbu Earthquake. This paper presents an interim report on the survey covering a wide area with deep structure as the survey object. The paper mentions that processing the survey data has been nearly completed, and is in the stage of making analyses and interpretations of the result of the processing, and that the survey was an attempt of making a unified survey over land areas, shallow sea areas, and seas by setting twelve traverse lines in and around the epicenter region. The paper also introduces briefly what has been found on hypocenters used, vibration receivers, vibration intervals, and CPD intervals, and on shapes of faults, particularly the continuity (the relationship of the Ashiya fault, Koyo fault and Osaka bay fault with the above two faults, branching of the Osaka bay fault, faults between the Wada promontory fault, Awaji Island and the Osaka bay fault, the fault off the east coast at the central part of Awaji Island, the Shichiku fault on the west coast of Awaji Island, and the basement fault). Mention is given also on the basement structure chart of the Osaka bay prepared preliminarily for the purpose of reference. 2 figs.

  7. Medical Applications

    CERN Document Server

    Biscari, C.

    2014-12-19

    The use of accelerators for medical applications has evolved from initial experimentation to turn-key devices commonly operating in hospitals. New applications are continuously being developed around the world, and the hadrontherapy facilities of the newest generation are placed at the frontier between industrial production and advanced R&D. An introduction to the different medical application accelerators is followed by a description of the hadrontherapy facilities, with special emphasis on CNAO, and the report closes with a brief outlook on the future of this field.

  8. Medical Applications

    International Nuclear Information System (INIS)

    Biscari, C; Falbo, L

    2014-01-01

    The use of accelerators for medical applications has evolved from initial experimentation to turn-key devices commonly operating in hospitals. New applications are continuously being developed around the world, and the hadrontherapy facilities of the newest generation are placed at the frontier between industrial production and advanced R&D. An introduction to the different medical application accelerators is followed by a description of the hadrontherapy facilities, with special emphasis on CNAO, and the report closes with a brief outlook on the future of this field

  9. Medical research and multidisciplinary applications with laser-accelerated beams: the ELIMED netwotk at ELI-Beamlines

    Science.gov (United States)

    Tramontana, A.; Anzalone, A.; Candiano, G.; Carpinelli, M.; Cirrone, G. A. P.; Cuttone, G.; Korn, G.; Licciardello, T.; Maggiore, M.; Manti, L.; Margarone, D.; Musumarra, A.; Perozziello, F.; Pisciotta, P.; Raffaele, L.; Romano, F.; Romano, F. P.; Stancampiano, C.; Schillaci, F.; Scuderi, V.; Torrisi, L.; Tudisco, S.

    2014-04-01

    Laser accelerated proton beams represent nowadays an attractive alternative to the conventional ones and they have been proposed in different research fields. In particular, the interest has been focused in the possibility of replacing conventional accelerating machines with laser-based accelerators in order to develop a new concept of hadrontherapy facilities, which could result more compact and less expensive. With this background the ELIMED (ELIMED: ELI-Beamlines MEDical applications) research project has been launched by LNS-INFN researchers (Laboratori Nazionali del Sud-Istituto Nazionale di Fisica Nucleare, Catania, IT) and ASCR-FZU researchers (Academy of Sciences of the Czech Republic-Fyzikální ústar, Prague, Cz), within the pan-European ELI-Beamlines facility framework. Its main purposes are the demonstration of future applications in hadrontherapy of optically accelerated protons and the realization of a laser-accelerated ion transport beamline for multidisciplinary applications. Several challenges, starting from laser-target interaction and beam transport development, up to dosimetric and radiobiological issues, need to be overcome in order to reach the final goals. The design and the realization of a preliminary beam handling and dosimetric system and of an advanced spectrometer for high energy (multi-MeV) laser-accelerated ion beams will be shortly presented in this work.

  10. Performance of the reconstruction algorithms of the FIRST experiment pixel sensors vertex detector

    Energy Technology Data Exchange (ETDEWEB)

    Rescigno, R., E-mail: regina.rescigno@iphc.cnrs.fr [Institut Pluridisciplinaire Hubert Curien, 23 rue du Loess, 67037 Strasbourg Cedex 2 (France); Finck, Ch.; Juliani, D. [Institut Pluridisciplinaire Hubert Curien, 23 rue du Loess, 67037 Strasbourg Cedex 2 (France); Spiriti, E. [Istituto Nazionale di Fisica Nucleare - Laboratori Nazionali di Frascati (Italy); Istituto Nazionale di Fisica Nucleare - Sezione di Roma 3 (Italy); Baudot, J. [Institut Pluridisciplinaire Hubert Curien, 23 rue du Loess, 67037 Strasbourg Cedex 2 (France); Abou-Haidar, Z. [CNA, Sevilla (Spain); Agodi, C. [Istituto Nazionale di Fisica Nucleare - Laboratori Nazionali del Sud (Italy); Alvarez, M.A.G. [CNA, Sevilla (Spain); Aumann, T. [GSI Helmholtzzentrum für Schwerionenforschung, Darmstadt (Germany); Battistoni, G. [Istituto Nazionale di Fisica Nucleare - Sezione di Milano (Italy); Bocci, A. [CNA, Sevilla (Spain); Böhlen, T.T. [European Organization for Nuclear Research CERN, Geneva (Switzerland); Medical Radiation Physics, Karolinska Institutet and Stockholm University, Stockholm (Sweden); Boudard, A. [CEA-Saclay, IRFU/SPhN, Gif sur Yvette Cedex (France); Brunetti, A.; Carpinelli, M. [Istituto Nazionale di Fisica Nucleare - Sezione di Cagliari (Italy); Università di Sassari (Italy); Cirrone, G.A.P. [Istituto Nazionale di Fisica Nucleare - Laboratori Nazionali del Sud (Italy); Cortes-Giraldo, M.A. [Departamento de Fisica Atomica, Molecular y Nuclear, University of Sevilla, 41080-Sevilla (Spain); Cuttone, G.; De Napoli, M. [Istituto Nazionale di Fisica Nucleare - Laboratori Nazionali del Sud (Italy); Durante, M. [GSI Helmholtzzentrum für Schwerionenforschung, Darmstadt (Germany); and others

    2014-12-11

    Hadrontherapy treatments use charged particles (e.g. protons and carbon ions) to treat tumors. During a therapeutic treatment with carbon ions, the beam undergoes nuclear fragmentation processes giving rise to significant yields of secondary charged particles. An accurate prediction of these production rates is necessary to estimate precisely the dose deposited into the tumours and the surrounding healthy tissues. Nowadays, a limited set of double differential carbon fragmentation cross-section is available. Experimental data are necessary to benchmark Monte Carlo simulations for their use in hadrontherapy. The purpose of the FIRST experiment is to study nuclear fragmentation processes of ions with kinetic energy in the range from 100 to 1000 MeV/u. Tracks are reconstructed using information from a pixel silicon detector based on the CMOS technology. The performances achieved using this device for hadrontherapy purpose are discussed. For each reconstruction step (clustering, tracking and vertexing), different methods are implemented. The algorithm performances and the accuracy on reconstructed observables are evaluated on the basis of simulated and experimental data.

  11. Evaluation of dacryocystorhinostomy using optical coherence tomography and rebamipide ophthalmic suspension

    Directory of Open Access Journals (Sweden)

    Fujimoto M

    2014-08-01

    Full Text Available Masahiro Fujimoto,1 Ken Ogino,1 Chika Miyazaki,1,2 Miou Hirose,1,3 Hiroko Matsuyama,1,4 Takeshi Moritera,1,5 Nagahisa Yoshimura1 1Department of Ophthalmology and Visual Sciences, Kyoto University Graduate School of Medicine, Kyoto, Japan; 2Department of Ophthalmology, Hyogo Prefectural Tsukaguchi Hospital, Hyogo, Japan; 3Department of Ophthalmology, Hyogo Prefectural Amagasaki Hospital, Hyogo, Japan; 4Department of Ophthalmology, National Hospital Organization Himeji Medical Center, Hyogo, Japan; 5Moritera Eye Clinic, Shiga, Japan Purpose: To evaluate the surgical outcome of dacryocystorhinostomy (DCR by measuring the tear meniscus, using optical coherence tomography and rebamipide ophthalmic suspension. Methods: Patients with nasolacrimal obstruction and chronic dacryocystitis who were scheduled for an endonasal DCR underwent tear meniscus examinations before and 2 months after surgery. Vertical scans of the inferior menisci were performed before and at 1, 3, 5, 7, and 10 minutes after the instillation of rebamipide ophthalmic suspension. The tear menisci areas were measured with imaging software. Ten young adults without epiphora formed the control group.Results: Anatomical success was achieved on 22 sides of 21 patients. The patients’ postoperative tear menisci were significantly smaller than the preoperative menisci at all points during the test, and the response to volume loading in the postoperative patients was corrected to nearly that of the young, healthy adults. Nevertheless, the postoperative meniscus area tended to be larger than that of the young adults at all points.Conclusion: The reduced tear meniscus area after DCR reflected the success of the surgical procedure. However, incomplete recovery of the meniscus after the test might suggest a residual disorder of the lacrimal drainage system after DCR. Keywords: dacryocystorhinostomy, tear meniscus, rebamipide, optical coherence tomography

  12. Proton computed tomography images with algebraic reconstruction

    Energy Technology Data Exchange (ETDEWEB)

    Bruzzi, M. [Physics and Astronomy Department, University of Florence, Florence (Italy); Civinini, C.; Scaringella, M. [INFN - Florence Division, Florence (Italy); Bonanno, D. [INFN - Catania Division, Catania (Italy); Brianzi, M. [INFN - Florence Division, Florence (Italy); Carpinelli, M. [INFN - Laboratori Nazionali del Sud, Catania (Italy); Chemistry and Pharmacy Department, University of Sassari, Sassari (Italy); Cirrone, G.A.P.; Cuttone, G. [INFN - Laboratori Nazionali del Sud, Catania (Italy); Presti, D. Lo [INFN - Catania Division, Catania (Italy); Physics and Astronomy Department, University of Catania, Catania (Italy); Maccioni, G. [INFN – Cagliari Division, Cagliari (Italy); Pallotta, S. [INFN - Florence Division, Florence (Italy); Department of Biomedical, Experimental and Clinical Sciences, University of Florence, Florence (Italy); SOD Fisica Medica, Azienda Ospedaliero-Universitaria Careggi, Firenze (Italy); Randazzo, N. [INFN - Catania Division, Catania (Italy); Romano, F. [INFN - Laboratori Nazionali del Sud, Catania (Italy); Sipala, V. [INFN - Laboratori Nazionali del Sud, Catania (Italy); Chemistry and Pharmacy Department, University of Sassari, Sassari (Italy); Talamonti, C. [INFN - Florence Division, Florence (Italy); Department of Biomedical, Experimental and Clinical Sciences, University of Florence, Florence (Italy); SOD Fisica Medica, Azienda Ospedaliero-Universitaria Careggi, Firenze (Italy); Vanzi, E. [Fisica Sanitaria, Azienda Ospedaliero-Universitaria Senese, Siena (Italy)

    2017-02-11

    A prototype of proton Computed Tomography (pCT) system for hadron-therapy has been manufactured and tested in a 175 MeV proton beam with a non-homogeneous phantom designed to simulate high-contrast material. BI-SART reconstruction algorithms have been implemented with GPU parallelism, taking into account of most likely paths of protons in matter. Reconstructed tomography images with density resolutions r.m.s. down to ~1% and spatial resolutions <1 mm, achieved within processing times of ~15′ for a 512×512 pixels image prove that this technique will be beneficial if used instead of X-CT in hadron-therapy.

  13. 神戸女学院岡田山キャンパスの高等植物相(I) : 総論および各論第1部 : シダ植物門・種子植物門,裸子植物亜門

    OpenAIRE

    野崎, 玲児; 熊取谷, 薫; 北川, 智美; 西原, 光恵; Reiji, NOZAKI; Kaoru, KUMATORIYA; Tomomi, KITAGAWA; Mitsue, NISHIHARA

    2006-01-01

    To make a vascular plant flora of 'Okadayama Campus', Kobe College, Hyogo Prefecture, wild plant species growing in the campus were surveyed, with the deposition of voucher specimens in the laboratory. Okadayama campus is located nearly in the southeastern corner of the Hyogo Prefecture, with the area of 14ha, and the altitude of 8 to 49m above sea level. Climatically, the campus lies in the warm-temperate zones, and under the influence of Seto inland-Sea type climate characterized by little ...

  14. Distribution of strong ground motion from uppermost crustal structure. Comparison with disaster from the Hyogo-ken Nanbu Earthquake; Yaya fukai chika kozo no henka ni yoru kyoshindo bunpu. Hyogoken nanbu jishin ni yoru higai bunpu tono hikaku

    Energy Technology Data Exchange (ETDEWEB)

    Zhao, Z; Okubo, R [Kawasaki Geological Engineering Co. Ltd., Tokyo (Japan)

    1997-10-22

    It was intended to elucidate characteristics of distribution of damages caused by an earthquake which occurs directly below an urban area. Therefore, numerical simulation using the pseudo-spectral method was performed on characteristics of seismic wave propagation in non-homogenous media composed of rock beds and sediment beds, and of seismic wave amplitudes on ground surface. The simulation has utilized information on underground structures disclosed by using the latest physical exploration method. The underground structure model assumed a two-dimensional model hypothesizing presence of upper, middle and lower beds in the Osaka bed group on granite, using as reference the information on S-wave velocity underground structure revealed by the microtremor exploration method. With an objective to elucidate characteristics of distribution of collapse ratio in the area from 8-chome, Okamoto, Higashinada Ward, Kobe City to 2-chome of Sakanasaki Minamicho, as damages suffered from the Hyogo-ken Nanbu Earthquake, a simulation has been performed varying the structure model based on the results derived by the microtremor exploration method and the reflection method. As a result, it was shown that the characteristics of the maximum amplitude distribution of displacement of ground surface, velocity and acceleration agree well with those of the collapse ratio distribution, and that the simulation using the pseudo-spectral method is an effective means to analyze the ground surface collapse ratio distribution. 5 refs., 3 figs.

  15. Particle radiotherapy for patients with H and N malignant tumor

    International Nuclear Information System (INIS)

    Murakami, Masao; Demizu, Yusuke; Niwa, Yasue; Terashima, Kazuki; Fujii, Osamu; Mima, Masayuki; Hashimoto, Naoki; Jin, Dongcun

    2011-01-01

    Particle beams have a characteristic called the Bragg peak, which is a peak formed at a fixed depth in the body depending on the acceleration energy. Utilizing this property, a high dose can be concentrated in the target tumor while minimizing damage to surrounding normal tissues. Proton and carbon ion beams have a higher linear energy transfer (LET) than X-rays. The relative biological effectiveness of proton and carbon ion beams compared with X-rays (=1) is estimated to be 1.1 and 3.0, respectively. Therefore, we can expect particle radiotherapy to be effective for patients with radio-resistant tumors such as malignant melanoma, adenoidcystic carcinoma and adenocarcinoma. As of the end of July 2011, there were 9 particle institutes operating in Japan; the Hyogo Ion Beam Medical Center was established in May 2001 as a leading project of the ''Hyogo Cancer Strategy''. One major characteristic is that the Center can generate both proton and carbon ion beams. Locally advanced nasal, paranasal or salivary gland cell tumors are good candidates for particle radiotherapy. Downsizing of the accelerator, price reduction of the machine, broad use of particle therapy in the field of clinical oncology, and intensity modulated particle therapy are future challenges. (author)

  16. Study on residents prime behavior against a flood disaster. ; In case of northern Hyogo floods caused by the typhoon 19th, 1990. Suigaiji no jumintaio kodo ni kansuru kenkyu. ; 1990 nen taifu 19 go no Hyogoken hokubu suigai wo jirei to shite

    Energy Technology Data Exchange (ETDEWEB)

    Murosaki, Y; Onishi, K [Kobe University, Kobe (Japan)

    1991-11-08

    This study analyzed the case of the flood disaster in the Northern Hyogo Prefecture in Japan caused by the Typhoon No. 19 in 1990, as to the residents {prime} behavior against the flood disaster, actualities of the living in the evacuation areas, and actions taken by the governmental offices, and brought the future problems in disaster treatment into light. The governmental evacuation recommendation has a certain effect on promoting the early evacuation of residents. An evacuation, whether done early enough or belated, depends on the reliability to the public information source and the face-to-face information transmittability. A trend shows that people living on the second floor get delayed in evacuation. The evacuation rate reduces in people owning houses, people engaged in farming, male sex, and large families. A trend shows that the rate of appealing living difficulties is relatively higher among people who evacuated to public evacuation areas including public halls than from those who evacuated to private evacuating places including houses of acquaintances. The administrative public organizations must maintain the disaster preventive administration wireless system and establish human information transmission network so that people can get information easily. Public evacuation places are required to have TV sets installed and information reporters arranged. 4 refs., 12 figs., 2 tabs.

  17. International Symposium on Hadrontherapy

    CERN Document Server

    Goitein, M; Scannicchio, D A; Schreuder, A N; Seiler, P G; CERN. Geneva; 2273500

    1996-01-01

    1) How accurately should patients be positioned,and why. 2) Three years experience with the NAC proton therapy patient positioning system. 3) Design approach for a highly accurate patient positioner for the Northeast Proton Therapy Center(NPTC) 4) Real time tracking of tumor positions for precise irradiation. 5) New methods for patient alignment.

  18. Report on bio-energy survey project in Sumoto City; 2001 nendo Sumoto baio energy chosa jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    With an intention to solve environmental problems and energy problems simultaneously in Sumoto City, Hyogo prefecture, surveys have been performed on feasibility of introducing biomass energy in the district. The dairy farming in Sumoto City has a trend of increase in the number of livestocks being fed in individual farms, and increase of milking quantity per livestock (increase of sewage discharge amount), with the increase of excessive excreta amount causing a problem. The Sumoto Dairy Farming Association is experiencing generation of excreta of 156 tons a day, which requires manure handling and disposal of 112 tons a day even after deducting the field dispersion. Discussions on a biogas plant with a capacity of 100 tons a day call for biogas generation amount of 2,500 m{sup 3} a day, electric power generation amount of 4,500 kWh a day, fuel cell size of 100 kW x 2 units, and heat generation amount of 6,000 kWh a day. A total of the estimated project cost amounts to 2,450,000,000 yen, the annual running cost to 65,280,000 yen, and the annual income to 82,000,000 yen. The electric power generation cost is 135 yen per kWh, the heat production cost is 952 yen per liter (converted to kerosene), and the saving amount due to excessive electric power and heat utilization amounted to 10,700,000 yen. The annual amount of CO2 reduction is 1330 tons. (NEDO)

  19. The High-Tech Face of e-Health

    CERN Document Server

    Shiers, Jamie D

    2014-01-01

    This chapter focuses on the current and potential use of e-Infrastructures in the domain of eHealth. It starts by identifying a small number of specific Use Cases and then addresses how these can be optimized—or possibly revolutionized—by the use of state-of-the-art distributing computing infrastructures (DCIs). Specific topics that are addressed include “long-term” data preservation (for the duration of a patient’s life as well as (far) beyond for collective-oriented studies), federation of heterogeneous data sources, provision of redundant and highly accessible data storage and federated identity management. The work draws heavily on the author’s experience in distributed computing infrastructures to address the challenges of the Large Hadron Collider at CERN, together with participation in generic e-Infrastructure projects, such as the EGEE project services and EGI. It also benefits from experience in hadron-therapy oriented projects with which CERN has synergies both as an accelerator laborato...

  20. ELIMED: a new hadron therapy concept based on laser driven ion beams

    Science.gov (United States)

    Cirrone, Giuseppe A. P.; Margarone, Daniele; Maggiore, Mario; Anzalone, Antonello; Borghesi, Marco; Jia, S. Bijan; Bulanov, Stepan S.; Bulanov, Sergei; Carpinelli, Massimo; Cavallaro, Salvatore; Cutroneo, Mariapompea; Cuttone, Giacomo; Favetta, Marco; Gammino, Santo; Klimo, Ondrej; Manti, Lorenzo; Korn, Georg; La Malfa, Giuseppe; Limpouch, Jiri; Musumarra, Agatino; Petrovic, Ivan; Prokupek, Jan; Psikal, Jan; Ristic-Fira, Aleksandra; Renis, Marcella; Romano, Francesco P.; Romano, Francesco; Schettino, Giuseppe; Schillaci, Francesco; Scuderi, Valentina; Stancampiano, Concetta; Tramontana, Antonella; Ter-Avetisyan, Sargis; Tomasello, Barbara; Torrisi, Lorenzo; Tudisco, Salvo; Velyhan, Andriy

    2013-05-01

    Laser accelerated proton beams have been proposed to be used in different research fields. A great interest has risen for the potential replacement of conventional accelerating machines with laser-based accelerators, and in particular for the development of new concepts of more compact and cheaper hadrontherapy centers. In this context the ELIMED (ELI MEDical applications) research project has been launched by INFN-LNS and ASCR-FZU researchers within the pan-European ELI-Beamlines facility framework. The ELIMED project aims to demonstrate the potential clinical applicability of optically accelerated proton beams and to realize a laser-accelerated ion transport beamline for multi-disciplinary user applications. In this framework the eye melanoma, as for instance the uveal melanoma normally treated with 62 MeV proton beams produced by standard accelerators, will be considered as a model system to demonstrate the potential clinical use of laser-driven protons in hadrontherapy, especially because of the limited constraints in terms of proton energy and irradiation geometry for this particular tumour treatment. Several challenges, starting from laser-target interaction and beam transport development up to dosimetry and radiobiology, need to be overcome in order to reach the ELIMED final goals. A crucial role will be played by the final design and realization of a transport beamline capable to provide ion beams with proper characteristics in terms of energy spectrum and angular distribution which will allow performing dosimetric tests and biological cell irradiation. A first prototype of the transport beamline has been already designed and other transport elements are under construction in order to perform a first experimental test with the TARANIS laser system by the end of 2013. A wide international collaboration among specialists of different disciplines like Physics, Biology, Chemistry, Medicine and medical doctors coming from Europe, Japan, and the US is growing up

  1. Determination of the geographic origin of onions between three main production areas in Japan and other countries by mineral composition.

    Science.gov (United States)

    Ariyama, Kaoru; Aoyama, Yoshinori; Mochizuki, Akashi; Homura, Yuji; Kadokura, Masashi; Yasui, Akemi

    2007-01-24

    Onions (Allium cepa L.) are produced in many countries and are one of the most popular vegetables in the world, thus leading to an enormous amount of international trade. It is currently important that a scientific technique be developed for determining geographic origin as a means to detect fraudulent labeling. We have therefore developed a technique based on mineral analysis and linear discriminant analysis (LDA). The onion samples used in this study were from Hokkaido, Hyogo, and Saga, which are the primary onion-growing areas in Japan, and those from countries that export onions to Japan (China, the United States, New Zealand, Thailand, Australia, and Chile). Of 309 samples, 108 were from Hokkaido, 52 were from Saga, 77 were from Hyogo, and 72 were from abroad. Fourteen elements (Na, Mg, P, Mn, Co, Ni, Cu, Zn, Rb, Sr, Mo, Cd, Cs, and Ba) in the samples were determined by frame atomic adsorption spectrometry, inductively coupled plasma optical emission spectrometry, and inductively coupled plasma mass spectrometry. The models established by LDA were used to discriminate the geographic origin between Hokkaido and abroad, Hyogo and abroad, and Saga and abroad. Ten-fold cross-validations were conducted using these models. The discrimination accuracies obtained by cross-validation between Hokkaido and abroad were 100 and 86%, respectively. Those between Hyogo and abroad were 100 and 90%, respectively. Those between Saga and abroad were 98 and 90%, respectively. In addition, it was demonstrated that the fingerprint of an element pattern from a specific production area, which a crop receives, did not easily change by the variations of fertilization, crop year, variety, soil type, and production year if appropriate elements were chosen.

  2. Seismic response analysis for hinged-leg type port crane

    Energy Technology Data Exchange (ETDEWEB)

    Kashiwazaki, A.; Kanayama, T.; Arai, K. [Ishikawajima-Harima Heavy Industries Co. Ltd., Tokyo (Japan)

    2000-04-01

    Container cranes and unloaders in Kobe Pont were severely damaged during the Southern Hyogo Prefecture Earthquake in 1995. Notably, some of the hinged-leg type of cranes with hinges at the end of sea-or land-side of legs were overturned. These damages were derived from the uplifting of their legs. To explain the uplifting and overturning behavior, we carried out nonlinear analyses and shaking table tests using a 1/8-scale model of the container crane. The results of nonlinear response analyses of hinged-leg type of crane, which are in an agreement with the state of damages in the Southern Hyogo Prefecture Earthquake and the result of shaking table tests, are described. (author)

  3. The KnowRISK project - Know your city, Reduce seISmic risK through non-structural elements

    Science.gov (United States)

    Sousa Oliveria, Carlos; Amaral Ferreira, Mónica; Lopez, Mário; Sousa Silva, Delta; Musacchio, Gemma; Rupakhety, Rajesh; Falsaperla, Susanna; Meroni, Fabrizio; Langer, Horst

    2016-04-01

    Historically, there is a tendency to focus on seismic structural performance of buildings, neglecting the potential for damage of non-structural elements. In particular, non-structural elements of buildings are their architectural parts (i.e. partitions, ceilings, cladding), electrical and mechanical components (i.e., distribution panels, piping, plumbing), and contents (e.g., furniture, bookcases, computers and desktop equipment). Damage of these elements often contributes significantly to earthquake impacts. In the 1999 Izmit Earthquake, Turkey, 50% of the injuries and 3% of human losses were caused by non-structural failures. In the 2010-2011 Christchurch Earthquakes (New Zealand), 40% of building damage was induced by non-structural malfunctions. Around 70%-85% of construction cost goes into these elements, and their damage can strongly influence the ability of communities to cope with and recover from earthquakes. The project Know your city, Reduce seISmic risK through non-structural elements (KnowRISK) aims at facilitating local communities' access to expert knowledge on non-structural seismic protection solutions. The project will study seismic scenarios critical for non-structural damage, produce a portfolio of non-structural protection measures and investigate the level of awareness in specific communities. We will implement risk communication strategies that will take into account the social and cultural background and a participatory approach to raise awareness in local communities. The paradox between the progress of scientific knowledge and the ongoing increase of losses from natural disasters worldwide is a well-identified gap in the UN Hyogo Framework for Action 2005-2015, in which one of the main priorities is the investment on "knowledge use, innovation and education to build a culture of safety and resilience". The KnowRISK is well aligned with these priorities and will contribute to participatory action aimed at: i) transferring expert knowledge

  4. The GEANT4 toolkit capability in the hadron therapy field: simulation of a transport beam line

    International Nuclear Information System (INIS)

    Cirrone, G.A.P.; Cuttone, G.; Di Rosa, F.; Raffaele, L.; Russo, G.; Guatelli, S.; Pia, M.G.

    2006-01-01

    At Laboratori Nazionali del Sud of the Instituto Nazionale di Fisica Nucleare of Catania (Sicily, Italy), the first Italian hadron therapy facility named CATANA (Centro di AdroTerapia ed Applicazioni Nucleari Avanzate) has been realized. Inside CATANA 62 MeV proton beams, accelerated by a superconducting cyclotron, are used for the radiotherapeutic treatments of some types of ocular tumours. Therapy with hadron beams still represents a pioneer technique, and only a few centers worldwide can provide this advanced specialized cancer treatment. On the basis of the experience so far gained, and considering the future hadron-therapy facilities to be developed (Rinecker, Munich Germany, Heidelberg/GSI, Darmstadt, Germany, PSI Villigen, Switzerland, CNAO, Pavia, Italy, Centro di Adroterapia, Catania, Italy) we decided to develop a Monte Carlo application based on the GEANT4 toolkit, for the design, the realization and the optimization of a proton-therapy beam line. Another feature of our project is to provide a general tool able to study the interactions of hadrons with the human tissue and to test the analytical-based treatment planning systems actually used in the routine practice. All the typical elements of a hadron-therapy line, such as diffusers, range shifters, collimators and detectors were modelled. In particular, we simulated the Markus type ionization chamber and a Gaf Chromic film as dosimeters to reconstruct the depth (Bragg peak and Spread Out Bragg Peak) and lateral dose distributions, respectively. We validated our simulated detectors comparing the results with the experimental data available in our facility

  5. The GEANT4 toolkit capability in the hadron therapy field: simulation of a transport beam line

    Science.gov (United States)

    Cirrone, G. A. P.; Cuttone, G.; Di Rosa, F.; Raffaele, L.; Russo, G.; Guatelli, S.; Pia, M. G.

    2006-01-01

    At Laboratori Nazionali del Sud of the Instituto Nazionale di Fisica Nucleare of Catania (Sicily, Italy), the first Italian hadron therapy facility named CATANA (Centro di AdroTerapia ed Applicazioni Nucleari Avanzate) has been realized. Inside CATANA 62 MeV proton beams, accelerated by a superconducting cyclotron, are used for the radiotherapeutic treatments of some types of ocular tumours. Therapy with hadron beams still represents a pioneer technique, and only a few centers worldwide can provide this advanced specialized cancer treatment. On the basis of the experience so far gained, and considering the future hadron-therapy facilities to be developed (Rinecker, Munich Germany, Heidelberg/GSI, Darmstadt, Germany, PSI Villigen, Switzerland, CNAO, Pavia, Italy, Centro di Adroterapia, Catania, Italy) we decided to develop a Monte Carlo application based on the GEANT4 toolkit, for the design, the realization and the optimization of a proton-therapy beam line. Another feature of our project is to provide a general tool able to study the interactions of hadrons with the human tissue and to test the analytical-based treatment planning systems actually used in the routine practice. All the typical elements of a hadron-therapy line, such as diffusers, range shifters, collimators and detectors were modelled. In particular, we simulated the Markus type ionization chamber and a Gaf Chromic film as dosimeters to reconstruct the depth (Bragg peak and Spread Out Bragg Peak) and lateral dose distributions, respectively. We validated our simulated detectors comparing the results with the experimental data available in our facility.

  6. The GEANT4 toolkit capability in the hadron therapy field: simulation of a transport beam line

    Energy Technology Data Exchange (ETDEWEB)

    Cirrone, G.A.P. [Laboratori Nazionali del Sud, Istituto Nazionale di Fisica Nucleare, Via S. Sofia 62, Catania (Italy); Cuttone, G. [Laboratori Nazionali del Sud, Istituto Nazionale di Fisica Nucleare, Via S. Sofia 62, Catania (Italy); Di Rosa, F. [Laboratori Nazionali del Sud, Istituto Nazionale di Fisica Nucleare, Via S. Sofia 62, Catania (Italy); Raffaele, L. [Laboratori Nazionali del Sud, Istituto Nazionale di Fisica Nucleare, Via S. Sofia 62, Catania (Italy); Russo, G. [Laboratori Nazionali del Sud, Istituto Nazionale di Fisica Nucleare, Via S. Sofia 62, Catania (Italy); Guatelli, S. [Istituto Nazionale di Fisica Nucleare, Sezione di Genova, Via Dodecaneso 33, Genova (Italy); Pia, M.G. [Istituto Nazionale di Fisica Nucleare, Sezione di Genova, Via Dodecaneso 33, Genova (Italy)

    2006-01-15

    At Laboratori Nazionali del Sud of the Instituto Nazionale di Fisica Nucleare of Catania (Sicily, Italy), the first Italian hadron therapy facility named CATANA (Centro di AdroTerapia ed Applicazioni Nucleari Avanzate) has been realized. Inside CATANA 62 MeV proton beams, accelerated by a superconducting cyclotron, are used for the radiotherapeutic treatments of some types of ocular tumours. Therapy with hadron beams still represents a pioneer technique, and only a few centers worldwide can provide this advanced specialized cancer treatment. On the basis of the experience so far gained, and considering the future hadron-therapy facilities to be developed (Rinecker, Munich Germany, Heidelberg/GSI, Darmstadt, Germany, PSI Villigen, Switzerland, CNAO, Pavia, Italy, Centro di Adroterapia, Catania, Italy) we decided to develop a Monte Carlo application based on the GEANT4 toolkit, for the design, the realization and the optimization of a proton-therapy beam line. Another feature of our project is to provide a general tool able to study the interactions of hadrons with the human tissue and to test the analytical-based treatment planning systems actually used in the routine practice. All the typical elements of a hadron-therapy line, such as diffusers, range shifters, collimators and detectors were modelled. In particular, we simulated the Markus type ionization chamber and a Gaf Chromic film as dosimeters to reconstruct the depth (Bragg peak and Spread Out Bragg Peak) and lateral dose distributions, respectively. We validated our simulated detectors comparing the results with the experimental data available in our facility.

  7. Prompt gamma ray diagnostics and enhanced hadron-therapy using neutron-free nuclear reactions

    Czech Academy of Sciences Publication Activity Database

    Giuffrida, Lorenzo; Margarone, Daniele; Cirrone, G.A.P.; Picciotto, A.; Cuttone, G.; Korn, Georg

    2016-01-01

    Roč. 6, č. 10 (2016), s. 1-10, č. článku 105204. ISSN 2158-3226 R&D Projects: GA MŠk EF15_008/0000162; GA MŠk LQ1606; GA ČR(CZ) GA15-02964S Grant - others:ELI Beamlines(XE) CZ.02.1.01/0.0/0.0/15_008/0000162 Institutional support: RVO:68378271 Keywords : thermonuclear fusion * capture therapy * cancer Subject RIV: BL - Plasma and Gas Discharge Physics OBOR OECD: Fluids and plasma physics (including surface physics) Impact factor: 1.568, year: 2016

  8. Report on new energy vision at Hinase Town area; 2001 nendo Hinase cho chiiki shin energy vision hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-03-01

    With an objective of accelerating introduction of and uplifting consciousness on new energies at Hinase Town in Hyogo Prefecture, investigations and discussions were given on the energy demand, quantity of new energies available, and the new energy introduction projects for the town, thus a new energy vision was established. The estimated amount of energy consumption in Hinase Town is 242,814,320,000 kcal in fiscal 2000. The amount of carbon dioxide discharge associated therewith is 76.57 t-CO2/year. Regarding the energy consumption by departments, the industrial department consumes the most, followed by the transportation department, civil household department, and civil business department. The new energy introduction projects have discussed servicing of the bio-gas plant utilizing organic wastes and cogeneration, the new energy introduction projects for the Natural Energy Island at Kakui Island and the ocean ranch consisted of the use of solar heat water warmer, solar cell powered street lights, photovoltaic power generation, and electric cars for sightseeing visitors, the Eco-school promotion project for primary schools, introduction of energy saving devices into the town office, and the new energy proliferation and enlightenment project. (NEDO)

  9. The FLUKA code: An accurate simulation tool for particle therapy

    CERN Document Server

    Battistoni, Giuseppe; Böhlen, Till T; Cerutti, Francesco; Chin, Mary Pik Wai; Dos Santos Augusto, Ricardo M; Ferrari, Alfredo; Garcia Ortega, Pablo; Kozlowska, Wioletta S; Magro, Giuseppe; Mairani, Andrea; Parodi, Katia; Sala, Paola R; Schoofs, Philippe; Tessonnier, Thomas; Vlachoudis, Vasilis

    2016-01-01

    Monte Carlo (MC) codes are increasingly spreading in the hadrontherapy community due to their detailed description of radiation transport and interaction with matter. The suitability of a MC code for application to hadrontherapy demands accurate and reliable physical models capable of handling all components of the expected radiation field. This becomes extremely important for correctly performing not only physical but also biologically-based dose calculations, especially in cases where ions heavier than protons are involved. In addition, accurate prediction of emerging secondary radiation is of utmost importance in innovative areas of research aiming at in-vivo treatment verification. This contribution will address the recent developments of the FLUKA MC code and its practical applications in this field. Refinements of the FLUKA nuclear models in the therapeutic energy interval lead to an improved description of the mixed radiation field as shown in the presented benchmarks against experimental data with bot...

  10. Université de Genève | Séminaire de physique corpusculaire | 16 octobre

    CERN Multimedia

    2013-01-01

    Particle accelerators in tumour therapy, Dr Ugo Amaldi, Technische Universität München and TERA Foundation.   Mercredi 16 octobre 2013, 11h15 Science III, Auditoire 1S081 Boulevard d’Yvoy, 1211 Genève 4 Abstract: "Hadrontherapy", or "particle therapy", is a collective word which covers all cancer therapy modalities which irradiate patients with beams of hadrons. The most used hadrons are protons and carbon ions. Protontherapy is developing very rapidly: more than 100,000 patients have been treated and eight companies offer turn-key centres. Carbon ions, used for about 8,000 patients, have a larger radiobiological effectiveness and, being a qualitatively different radiation, require still radiobiological and, in particular, clinical studies to define the best tumour targets. After a review of the rationale for hadrontherapy and of the accelerators used in protontherapy, the European centres for carbon ion therapy will be discussed. Fin...

  11. The FLUKA Code: Developments and Challenges for High Energy and Medical Applications

    CERN Document Server

    Böhlen, T T; Chin, M P W; Fassò, A; Ferrari, A; Ortega, P G; Mairani, A; Sala, P R; Smirnov, G; Vlachoudis, V

    2014-01-01

    The FLUKA Monte Carlo code is used extensively at CERN for all beam-machine interactions, radioprotection calculations and facility design of forthcoming projects. Such needs require the code to be consistently reliable over the entire energy range (from MeV to TeV) for all projectiles (full suite of elementary particles and heavy ions). Outside CERN, among various applications worldwide, FLUKA serves as a core tool for the HIT and CNAO hadron-therapy facilities in Europe. Therefore, medical applications further impose stringent requirements in terms of reliability and predictive power, which demands constant refinement of sophisticated nuclear models and continuous code improvement. Some of the latest developments implemented in FLUKA are presented in this paper, with particular emphasis on issues and concerns pertaining to CERN and medical applications.

  12. Preliminary test of the MONDO project secondary fast and ultrafast neutrons tracker response using protons and MIP particles

    Science.gov (United States)

    Traini, G.; Battistoni, G.; Giacometti, V.; Gioscio, E.; Marafini, M.; Mirabelli, R.; Pinci, D.; Sarti, A.; Sciubba, A.; Patera, V.

    2018-04-01

    The risk of developing a second malignant cancer as a late time consequence of undergoing a treatment, is one of the main concerns in particle therapy (PT). Since neutrons can release a significant dose far away from the tumour region, a precise characterisation of their production point, kinetic energy and abundance is eagerly needed. The treatment planning system (TPS) software that predicts the normal tissue toxicity in the target region and the risk of late complications in the whole body is currently based on the poorly known production cross-sections and will greatly benefit from improved precision double differential measurements. The MONDO (MOnitor for Neutron Dose in hadrOntherapy) project aims to build an ultrafast neutron tracker that could be used to characterise the production of secondary neutrons with energies in the 20–400 MeV range. The neutron tracking will proceed via the detection of recoil protons produced in two consecutive (n, p) elastic scattering interactions. The MONDO detector consists of a 10 × 10 × 20 cm3 matrix of thin scintillating fibres, arranged in orthogonally oriented layers. A compact read-out sensor with single photon detection capabilities employing the CMOS SPAD technology has been developed in collaboration with Fondazione Bruno Kessler (FBK). The detector will be completed by the end of 2018. A 4 × 4 × 4.8 cm3 prototype has been built using 250 μ m thick scintillating fibres of squared section and was tested using a proton beam and minimum ionising particles. In this contribution we present the experimental results related to the prototype test performed with a proton beam at the Proton Therapy Centre of the Trento Hospital (PTC) in May 2017. The results are compared with the results of a Monte Carlo simulation performed with the FLUKA software.

  13. Particles that fight cancer: the use of protons and carbon ions in cancer therapy

    CERN Multimedia

    CERN. Geneva

    2014-01-01

    Particles that fight cancer: the use of protons and carbon ions in cancer therapy Cancer is a major societal issue. A key challenge for cancer therapy is the complex and multifaceted nature of the disease, which calls for personalised treatment. Radiotherapy has been used to treat tumours for more than a century, and is still a staple in oncology: today, 50 % of cancer patients receive radiotherapy, half of them with curative intent. Hadrontherapy is one of the most technologically advanced methods of delivering radiation dose to the tumour while protecting surrounding healthy tissues. In addition, hadrontherapy can reach otherwise difficult to access deep-seated tumours and can be used for radio resistant tumours as in hypoxia. This year marks 60 years since the first patient was treated with protons in the US and 20 years since the use of carbon ions in Japan. Join us in learning about the journey of particle therapy in Japan and Europe, its challenges, clinical results and future prospects. Thursday 2...

  14. Mini-TEPC Microdosimetric Study of Carbon Ion Therapeutic Beams at CNAO

    Science.gov (United States)

    Conte, V.; Colautti, P.; Chiriotti, S.; Moros, D.; Ciocca, M.; Mairani, A.

    2017-09-01

    Mono-energetic carbon ion scanning beams of 195.2 MeV/u at the Italian National Centre for Oncological Hadrontherapy (CNAO) have been used to study the microdosimetric features of an "active" carbon ion beam used in hadrontherapy. A 30x30 mm2 area has been scanned by a 6 mm beam with scanning steps of 2 mm. A mini TEPC of 0.57 mm3 has been used to perform measurements in a water phantom at different depths on the beam axis. The detector small size allowed for measuring, with good spatial resolution, also inside the relatively small Bragg peak region and inside the distal edge, where the radiation quality varies quickly. In spite of the high event rate (up to 105 s-1), no pile-up effects were observed. Results showed that the frequency-mean lineal energy scaled well with the absorbed dose. Moreover, the dose-mean lineal energy itself seemed to be a good descriptor of the radiation quality.

  15. 2007 2008 ACADEMIC TRAINING PROGRAMME

    CERN Multimedia

    2007-01-01

    LECTURE SERIES 14, 15, 17 January 2008 11:00 to 12:00 - Council Chamber, bldg. 503-1-001 Applications of accelerators to tumour therapy U. AMALDI, TERA Foundation & University of Milano Bicocca The first lecture is devoted to an historical review of the developments of the teletherapy techniques which make use of hadron beams and are collectively called "hadrontherapy". The main emphasis is on the use of protons and light ions, but also neutrons, pions and antiprotons are considered. The second lecture reviews the rationale behind the use of carbon ions in the treatment of radioresistant tumours and the results obtained both with proton and carbon ion beams on the 60 000 patients treated worldwide. The numbers of patients who would profit from hadrontherapy are presented together with the current landscape of running and planned hospital based centres. The main technical challenges set by this therapeutic modality are discussed in the third lecture together with the app...

  16. 2007 2008 ACADEMIC TRAINING PROGRAMME

    CERN Multimedia

    2007-01-01

    LECTURE SERIES 14, 15, 17 January 2008 11:00 to 12:00 - Council Chamber, Bldg. 503-1-001 Applications of accelerators to tumour therapy U. AMALDI, TERA Foundation & University of Milano Bicocca The first lecture is devoted to an historical review of the developments of the teletherapy techniques which make use of hadron beams and are collectively called "hadrontherapy". The main emphasis is on the use of protons and light ions, but also neutrons, pions and antiprotons are considered. The second lecture reviews the rationale behind the use of carbon ions in the treatment of radioresistant tumours and the results obtained both with proton and carbon ion beams on the 60 000 patients treated worldwide. The numbers of patients who would profit from hadrontherapy are presented together with the current landscape of running and planned hospital based centres. The main technical challenges set by this therapeutic modality are discussed in the third lecture together with the app...

  17. IEEE International Semiconductor Laser Conference (14th) Held in Maui, Hawaii on September 19-23, 1994

    Science.gov (United States)

    1994-09-23

    subcommittee chairs, Tom Koch, James Whiteaway and Yasuhiko Arakawa, for their efforts. The other Conference Committee members, Gary Evans, Joanne...Academy of Sciences, St. Petersburg, Russia Asia end Ausat/agla K. Ikeda Chair: Yasuhiko Arakawa Mitsubishi Electric Corporation, Hyogo, Japan University

  18. Facts learnt from the Hanshin-Awaji disaster and consideration on design basis earthquake

    International Nuclear Information System (INIS)

    Shibata, Heki

    1997-01-01

    This paper will deal with how to establish the concept of the design basis earthquake for critical industrial facilities such as nuclear power plants in consideration of disasters induced by the 1995 Hyogoken-Nanbu Earthquake (Southern Hyogo-prefecture Earthquake-1995), so-called Kobe earthquake. The author once discussed various DBEs at 7 WCEE. At that time, the author assumed that the strongest effective PGA would be 0.7 G, and compared to the values of accelerations to a structure obtained by various codes in Japan and other countries. The maximum PGA observed by an instrument at the Southern Hyogo-pref. Earthquake-1995 exceeded the previous assumption of the author, even though the evaluation results of the previous paper had been pessimistic. According to the experience of Kobe event, the author will point out the necessity of the third earthquake S s adding to S 1 and S 2 , previous DBEs. (author)

  19. A Geant4 simulation of the depth dose percentage in brain tumors treatments using protons and carbon ions

    Energy Technology Data Exchange (ETDEWEB)

    Diaz, José A. M., E-mail: joadiazme@unal.edu.co; Torres, D. A., E-mail: datorresg@unal.edu.co [Physics Department, Universidad Nacional de Colombia, Bogot (Colombia)

    2016-07-07

    The deposited energy and dose distribution of beams of protons and carbon over a head are simulated using the free tool package Geant4 and the data analysis package ROOT-C++. The present work shows a methodology to understand the microscopical process occurring in a session of hadron-therapy using advance simulation tools.

  20. Beam handling and transport solutions

    Energy Technology Data Exchange (ETDEWEB)

    Maggiore, M. [Laboratori Nazionali di Legnaro, INFN, Via Universita' 2, Legnaro (PD) (Italy); Cirrone, G. A. P.; Schillaci, F.; Scuderi, V. [Istituto Nazionale di Fisica Nucleare, Laboratori Nazionali del Sud, Via Santa Sofia 62, Catania, Italy and Institute of Physics Czech Academy of Science, ELI-Beamlines project, Na Slovance 2, Prague (Czech Republic); Carpinelli, M. [INFN Sezione di Cagliari, c/o Dipartimento di Fisica, Università di Cagliari, Cagliari (Italy); Cuttone, G.; Romano, F. [Istituto Nazionale di Fisica Nucleare, Laboratori Nazionali del Sud, Via Santa Sofia 62, Catania (Italy); Tramontana, A. [Istituto Nazionale di Fisica Nucleare, Laboratori Nazionali del Sud, Via Santa Sofia 62, Catania, Italy and Universita' degli Studi di Catania, Dipartimento di Fisica, Via S. Sofia 64, Catania (Italy)

    2013-07-26

    The main purpose of the present study is to investigate the possibility to characterize the particle beams produced by the laser-target interaction in terms of collection, focusing and energy selection in order to evaluate the feasibility of a laser-driven facility in the field of medical application and, in particular, for hadrontherapy.

  1. Beam handling and transport solutions

    International Nuclear Information System (INIS)

    Maggiore, M.; Cirrone, G. A. P.; Schillaci, F.; Scuderi, V.; Carpinelli, M.; Cuttone, G.; Romano, F.; Tramontana, A.

    2013-01-01

    The main purpose of the present study is to investigate the possibility to characterize the particle beams produced by the laser-target interaction in terms of collection, focusing and energy selection in order to evaluate the feasibility of a laser-driven facility in the field of medical application and, in particular, for hadrontherapy

  2. Facts learnt from the Hanshin-Awaji disaster and consideration on design basis earthquake

    Energy Technology Data Exchange (ETDEWEB)

    Shibata, Heki [Yokohama National Univ. (Japan). Faculty of Engineering

    1997-03-01

    This paper will deal with how to establish the concept of the design basis earthquake for critical industrial facilities such as nuclear power plants in consideration of disasters induced by the 1995 Hyogoken-Nanbu Earthquake (Southern Hyogo-prefecture Earthquake-1995), so-called Kobe earthquake. The author once discussed various DBEs at 7 WCEE. At that time, the author assumed that the strongest effective PGA would be 0.7 G, and compared to the values of accelerations to a structure obtained by various codes in Japan and other countries. The maximum PGA observed by an instrument at the Southern Hyogo-pref. Earthquake-1995 exceeded the previous assumption of the author, even though the evaluation results of the previous paper had been pessimistic. According to the experience of Kobe event, the author will point out the necessity of the third earthquake S{sub s} adding to S{sub 1} and S{sub 2}, previous DBEs. (author)

  3. MONDO: A tracker for the characterization of secondary fast and ultrafast neutrons emitted in particle therapy

    Science.gov (United States)

    Mirabelli, R.; Battistoni, G.; Giacometti, V.; Patera, V.; Pinci, D.; Sarti, A.; Sciubba, A.; Traini, G.; Marafini, M.

    2018-01-01

    In Particle Therapy (PT) accelerated charged particles and light ions are used for treating tumors. One of the main limitation to the precision of PT is the emission of secondary particles due to the beam interaction with the patient: secondary emitted neutrons can release a significant dose far from the tumor. Therefore, a precise characterization of their flux, production energy and angle distribution is eagerly needed in order to improve the Treatment Planning Systems (TPS) codes. The principal aim of the MONDO (MOnitor for Neutron Dose in hadrOntherapy) project is the development of a tracking device optimized for the detection of fast and ultra-fast secondary neutrons emitted in PT. The detector consists of a matrix of scintillating square fibres coupled with a CMOS-based readout. Here, we present the characterization of the detector tracker prototype and CMOS-based digital SPAD (Single Photon Avalanche Diode) array sensor tested with protons at the Beam Test Facility (Frascati, Italy) and at the Proton Therapy Centre (Trento, Italy), respectively.

  4. Study on the environmental movements and distributions of natural radioactive nuclides on the granite area (II)

    International Nuclear Information System (INIS)

    Morishima, Hiroshige; Koga, Taeko

    1999-03-01

    The natural radionuclides as K-40, uranium decay series and thorium decay series etc. are widely distributed on environment, but are not uniformly. These have various forms as the sources of terrestrial environmental γ radiation and of radon and make wide fluctuation seasonal and spatially on the environment. We have selected Ikeda mineral spring district, Shimane pref., Misasa spa district, Tottori pref., Muro district, Hachibuse district, Nara pref. and Arima spa district, Hyogo-pref. for HBRA, and Kawanishi-shi, Hyogo pref. and Higashi-osaka-shi, Osaka pref. as CA. We have carried out the study on the environmental movement and distribution of natural radioactive nuclides containing radon and decay nuclides. Radon measurements have been carried using cup typed radon and thoron monitors, pico-rad method by active charcoal sampling and Pilon scintillation-cell by grub sampling. Accumulated radon monitors have been used with cellulose nitrate as solid state track detector. Rn-222 concentrations in air at Misasa spa ranged 2 - 150 Bq/m 3 outdoor and 8 - 194 Bq/m 3 indoor. Rn-222 concentrations on Misasa district, Asahi district and Takeda district geologically formed from granite strata are high, and those on Osika district and Mitoku district formed from volcanic rocks (Andesite and Basalt) are low level. Rn-222 concentration variations in well water used as drinking water were 2 - 138 Bq/l (mean value 31 Bq/l) and those in ground waters varied from non detectable to 4620 Bq/l (mean 875 Bq/l) on sampling time and places. Mean Rn-222 concentration in the spring water at Arima spa area, Hyogo prefecture is 26 Bq/l at Tansan spring source and the other spring sources are comparatively low level. (J.P.N.)

  5. Report on the project of drawing energy-saving visions for the Town of Sayo district; Sayomachi chiiki sho energy vision sakutei jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The survey/study is conducted to draw the district energy visions for Town of Sayo, Hyogo Pref. The town as a whole consumes energy at 1,269,040GJ/y, or 140,817MJ/y per capita, which is about 1.2 times larger than the nationwide average. By energy source, electric power accounts for 43%, and oil products 53%. The town as a whole emits carbon dioxide at 18,900,403kg-C/y, or 2,097kg-C/y per capita, which is lower than the nationwide average. The short-term (1 year or less), medium-term (3 year or less) and long-term (5 years or less) targets are drawn by employees of the town offices, citizens and entrepreneurs for energy-saving directions (saving of power for air conditioning by adjusting clothes, wider use of bicycles and public trains). Those facilities investigated for promoting energy saving include those for the town office buildings, solar energy system for producing hot water for town-operated swimming pool, and solar energy system and photovoltaic system for Harima Observatory Park. (NEDO)

  6. Regional new energy vision for Aogaki town; Aogakicho chiiki shin energy vision

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-02-01

    A regional new energy vision has been formulated as part of Phase 4 of the Town Development Program of Aogaki town, Hyogo Prefecture, calling for 'building a town, comfortable to live in and full of hope, by utilizing rich natural environments.' The results of activities conducted in this connection are summarized in five chapters, which are (1) the description of the new energy vision, (2) Aogaki-town's energy characteristics, (3) basic plan, (4) driving forward of prioritized plans, and (5) toward the driving forward of the new energy vision. Chapter (4) comprises the goal of the formulation of the prioritized plans, the definition of the prioritized plans, and the establishment of individual projects. Established as the individual projects are the introduction of new energy linked to the inhibition of carbon dioxide gas emissions, use of wind energy for multiple purposes, public facilities preceding others in the introduction of new energy, building of environmentally symbiotic residences utilizing new energy, utilization of new energy at recreation facilities, and the popularization of and enlightening about new energy and its introduction through the participation of the local population. (NEDO)

  7. Report on new energy vision planning operation at Yachiyo Town; 2001 nendo Yachiyo cho chiiki shin energy vision sakutei gyomu hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-02-01

    With an object of accelerating introduction of and uplifting consciousness on new energies at Yachiyo Town in Hyogo Prefecture, investigations and discussions were given on the energy consumption of the town, quantity of new energies in existence, and the new energy introduction projects, thus a new energy vision was established. Yachiyo Town consumes energy annually at 99,966 Gcal. By departments, the transportation department accounts for 46%, the industrial department for 24%, the civil household department for 16%, and the civil business department for 14%. By energy types, petroleum accounts for 69%, and electric power for 31%. The new energy introduction projects that have been discussed include introduction of photovoltaic power generation into the town office, public halls, primary and middle schools, and photovoltaic and micro-wind power generation for street lights, photovoltaic and wind power generation in the Garten Yachiyo, a city and farm town culture exchange facility, micro-hydroelectric power generation in Noma River, bio-mass energy utilizing forest resources and fabric wastes, clean energy fueled automobiles as public use cars, school buses and welfare buses, and small wind power and large photovoltaic power generation at Mt. Noma. (NEDO)

  8. observed by high pressure NMR and NQR

    Indian Academy of Sciences (India)

    Akogun, Hyogo 678-1297, Japan. ∗. Email: kohara@sci.himeji tech.ac.jp. Abstract. NMR and NQR studies on two interesting systems (URu2Si2, CeTIn5) were performed under high pressure. (1) URu2Si2: In the pressure range 3.0 to 8.3 kbar, we have observed new 29Si. NMR signals arising from the antiferromagnetic ...

  9. Modern physics letters A special issue on hadrontherapy

    CERN Document Server

    2015-01-01

    CERN Courier Review (Jul 8, 2016) : The applications of nuclear and particle physics to medicine have seen extraordinary development since the discovery of X-rays by Röntgen at the end of the 19th century. Medical imaging and oncologic therapy with photons and charged particles (specifically hadrons) are currently hot research topics. This special issue of Modern Physics Letters is dedicated to hadron therapy, which is the frontier of cancer radiation therapy, and aims at filling a gap in the current literature on medical physics. Through 10 invited review papers, the volume presents the basics of hadron therapy, along with the most recent scientific and technological developments in the field. The first part covers topics such as the history of hadron therapy, radiation biophysics, particle accelerators, dose-delivery systems and treatment planning. In the second part, more specific topics are treated, including dose and beam monitoring, proton computer tomography, innoacustics and microdosimetry. This vo...

  10. X-ray magnetic circular dichroism at IrL2,3 edges in Fe100−xIrx and ...

    Indian Academy of Sciences (India)

    2Japan Synchrotron Radiation Institute, SPring8, 1-1-1 Kouto, Mikazuki,. Hyogo 679-5198, Japan. ∗. Email: krishna@postman.riken.go.jp. Abstract. The formation of induced 5d magnetic moment on Ir in Fe100−x Irx (x=3, 10 and 17) and. Co100−x Irx (x =5, 17, 25 and 32) alloys has been investigated by X-ray magnetic ...

  11. Patterns of plant diversity loss and species turnover resulting from land abandonment and intensification in semi-natural grasslands.

    Science.gov (United States)

    Uchida, Kei; Koyanagi, Tomoyo F; Matsumura, Toshikazu; Koyama, Asuka

    2018-07-15

    Land-use changes cause biodiversity loss in semi-natural ecosystems worldwide. Biotic homogenization has led to biodiversity loss, mainly through declines in species composition turnover. Elucidating patterns of turnover in species composition could enhance our understanding of how anthropogenic activities affect community assembly. Here, we focused on whether the decreasing patterns in plant diversity and turnover of species composition resulting from land-use change vary in two regions. We estimated the species diversity and composition of semi-natural grasslands surrounding paddy fields in satoyama landscapes. We examined the differences in species diversity and composition across three land-use types (abandoned, traditional, and intensified) in two regions (Hyogo and Niigata Prefectures, Japan), which were characterized by different climatic conditions. We then assessed alpha-, beta-, and gamma-diversity to compare the patterns of diversity losses in the two regions as a result of land-use changes. In each region, gamma-diversity was consistently higher in the traditional sites compared to abandoned or intensified sites. The analyses revealed that most of the beta-diversity in traditional sites differed significantly from those of abandoned and intensified sites in both regions. However, the beta-diversity of total and perennial species did not differ between traditional and abandoned sites in the Hyogo region. We noted that the beta-diversity of total and perennial species in intensified sites was much lower than that in the traditional sites of the Niigata region. Overall, the patterns of alpha- and gamma-diversity loss were similar in both study regions. Although the biotic homogenization was caused by intensified land-use in the Niigata region, this hypothesis did not completely explain the loss of biodiversity in the abandoned sites in the Hyogo region. The present study contributes to the growing body of work investigating changes in biodiversity as a

  12. Sympathetic ophthalmia after 23-gauge transconjunctival sutureless vitrectomy

    Directory of Open Access Journals (Sweden)

    Masatoshi Haruta

    2010-11-01

    Full Text Available Masatoshi Haruta1, Hirokazu Mukuno2, Kazuaki Nishijima3, Hitoshi Takagi4, Mihori Kita51Department of Ophthalmology, Kurume University School of Medicine, Kurume, Fukuoka, Japan; 2Department of Ophthalmology, Konan Hospital, Kobe, Hyogo, Japan; 3Department of Ophthalmology and Visual Sciences, Kyoto University Graduate School of Medicine, Kyoto, Kyoto, Japan; 4Department of Ophthalmology, St Marianna University School of Medicine, Kawasaki, Kanagawa, Japan; 5Department of Ophthalmology, Hyogo Prefectural Amagasaki Hospital, Amagasaki, Hyogo, JapanPurpose: We report a case of a sympathetic ophthalmia that occurred after 23-gauge transconjunctival sutureless vitrectomy for a retinal detachment.Case report: A 41-year-old Japanese woman underwent combined phacoemulsification with intraocular lens implantation and 23-gauge transconjunctival sutureless vitrectomy for a rhegmatogenous retinal detachment in the right eye. Endolaser photocoagulation and silicone oil tamponade were used to manage inferior retinal holes. Four weeks after the surgery, she returned with a 5-day history of reduced vision and metamorphopsia in her left eye. Slit-lamp examination showed a shallow anterior chamber in the right eye and moderate anterior uveitis bilaterally. Silicone oil bubbles and pigment dispersion were observed in the subconjunctival space adjacent to the right eye’s superonasal sclerotomy site. Fundus examination showed multifocal serous retinal detachments in both eyes. A diagnosis of sympathetic ophthalmia was made and the patient was treated with intensive topical and systemic steroids. The subretinal fluid cleared in both eyes following treatment. Twelve months after the onset of inflammation, the patient’s condition was stable on a combination of oral cyclosporine and topical steroids. Sunset glow retinal changes remain, but there has been no evidence of recurrent inflammation.Conclusion: Sympathetic ophthalmia can develop after 23-gauge

  13. Conception, construction et essai d'un accélérateur linéaire à protons impulsé à 3 GHz (LIBO) pour la thérapie du cancer

    CERN Document Server

    Berra, Paolo; De Conto, J M; Demeyer, A; Gerard, J P; Hoffmann, H F; Remillieux, J; Bajard, M; Rosso, E; Szeless, Balázs; Weiss, M

    2005-01-01

    In the last ten years the use of proton beams in radiation therapy has become a clinical tool for treatment of deep-seated tumours. LIBO is a RF compact and low cost proton linear accelerator (SCL type) for hadrontherapy. It is conceived by TERA Foundation as a 3 GHz Linac Booster, to be mounted downstream of an existing cyclotron in order to boost the energy of the proton beam up to 200 MeV, needed for deep treatment (~25 cm) in the human body. With this solution it is possible to transform a low energy commercial cyclotron, normally used for eye melanoma therapy, isotope production and nuclear physics research, into an accelerator for deep-seated tumours. A prototype module of LIBO has been built and successfully tested with full RF power at CERN and with proton beam at INFN Laboratori Nazionali del Sud (LNS) in Catania, within an international collaboration between TERA Foundation, CERN, the Universities and INFN groups of Milan and Naples. The mid-term aim of the project is the technology transfer of the ...

  14. Fiscal 2001 photovoltaic power generation field test project (Locations of systems installed in fiscal 1998-2000 at public facilities and industries); 2001 nendo taiyoko field test jigyo (Kokyo shisetsuyou sangyo tou you 1998 - 2000 nendo secchisha)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-05-01

    The test was conducted for systems installed at General Health and Welfare Center, Munakata City, Fukuoka Prefecture; Comprehensive Traffic Center, Yamaguchi Prefecture; Primary schools, Sendai City, Miyagi Prefecture; Sakuragi Children's House, Shizuoka Prefecture; Midorigaoka Primary School, Hyogo Prefecture; Heath Center, Minamata City, Kumamoto Prefecture; Science Museum for Young People, Yamaguchi Prefecture; Wakatsuki Plastic Surgery Hospital, Niigata Prefecture; Hokuto Corporation, Aichi Prefecture; Industrial Research Institute, Ishikawa Prefecture; Shonan Institute of Technology, Kanagawa Prefecture; Gyosen Oil Co., Tokyo; Tamana Senior High School, Kumamoto Prefecture; Yukiyoshi Clinic, Niigata Prefecture; Saishoen Social Welfare Corporation; Akishimadai Kindergarten; Azabu Veterinarian School Group; Ueki-Kita Junior High School, Ueki Town; Garden of Longevity, Isen Town; Takamatsu Primary School, Takamatsu Town; Himeji Red Cross Hospital; and Kita-Daito Island Branch, Okinawa Electric Power Company, Inc. Mentioned in this report are the outlines of the photovoltaic power generation field test, the results of joint research, expected technical effect, enlightening effect, troubles involving power generation systems, and so forth. (NEDO)

  15. Project report - an overview of the project and experiences with project management

    DEFF Research Database (Denmark)

    Jørgensen, Michael Søgaard; Mikkelsen, Bent Egberg

    1996-01-01

    A collection of the project planning and the experiences with project management from the Catering 2000 project.As appendieces articles etc. from journals, newspapers etc. about the project.......A collection of the project planning and the experiences with project management from the Catering 2000 project.As appendieces articles etc. from journals, newspapers etc. about the project....

  16. Nuclear model developments in FLUKA for present and future applications

    Science.gov (United States)

    Cerutti, Francesco; Empl, Anton; Fedynitch, Anatoli; Ferrari, Alfredo; Ruben, GarciaAlia; Sala, Paola R.; Smirnov, George; Vlachoudis, Vasilis

    2017-09-01

    The FLUKAS code [1-3] is used in research laboratories all around the world for challenging applications spanning a very wide range of energies, projectiles and targets. FLUKAS is also extensively used for in hadrontherapy research studies and clinical planning systems. In this paper some of the recent developments in the FLUKAS nuclear physics models of relevance for very different application fields including medical physics are presented. A few examples are shown demonstrating the effectiveness of the upgraded code.

  17. Communication and flood risk awareness in the framework of DRIHM project

    Science.gov (United States)

    Llasat, Maria-Carmen; Llasat-Botija, Montserrat; Gilabert, Joan; Marcos, Raül; Parodi, Antonio; Rebora, Nicola; Garrote, Luís

    2014-05-01

    One of the main objectives of the Hyogo Framework for Action 2005-2015 of the United Nations is to increase public awareness so as to understand the risks, vulnerabilities and disaster reduction globally. In the case of floods they are a major hazard in Spain. In the last 30 years alone, more than 300 flood and flash-flood events have been recorded. Usually these events produce minor damages and, occasionally, some deaths, usually due to imprudent behavior. In this context, improvements in the forecast and warning systems, the communication process and for the population to have a better knowledge using new technologies are welcome. The starting point of this communication is the analysis of the treatment of flood events made by the press, the risk perception of the population, as well as the communication tools and protocols of Civil Protection and Water Catalan Agency (ACA) in Catalonia (NE of Iberian Peninsula). Afterwards, the analysis of the application of new tools developed by the University of Barcelona, with specific emphasis on the collaboration with the population, is shown. La Rambla is an informative portal of flood prevention, where share knowledge and experiences with the population. It is also a historical flood site where everyone can contribute and participate by sending experiences, data, records, pictures and much more. In La Rambla we can find information such as flood prevention plans, acts, scientific vocabulary ... There are also sections on historical floods, photo galleries, quizzes, flood news, and much more. The blog will be also used as a platform to distribute post-event questionnaires in order to analyze social impact as well as the population behavior when faced with a flood. Besides this, social networks are some of the most important channels where warnings and flood risk situations can be communicated. In the case of Facebook and Twitter, we use the platforms as a warning channel, to have a simple monitoring of the event and

  18. Clinical and research activities at the CATANA facility of INFN-LNS: fom the conventional hadrontherapy to the laser-driven approach

    Czech Academy of Sciences Publication Activity Database

    Cirrone, G.A.P.; Cuttone, G.; Raffaele, L.; Salamone, S.; Avitabile, T.; Privitera, G.; Spatola, C.; Margarone, Daniele; Patti, V.; Petringa, G.; Romano, F.; Russo, A.; Russo, An.; Sabini, M.G.; Scuderi, Valentina; Schillaci, F.; Valastro, L.

    2017-01-01

    Roč. 7, Sep (2017), 1-13, č. článku 223. ISSN 2234-943X R&D Projects: GA MŠk EF15_008/0000162 Grant - others:ELI Beamlines(XE) CZ.02.1.01/0.0/0.0/15_008/0000162 Institutional support: RVO:68378271 Keywords : proton therapy * dosimetry * clinical follow-up * Monte Carlo * laser -driven * ELIMED Subject RIV: BL - Plasma and Gas Discharge Physics OBOR OECD: Fluids and plasma physics (including surface physics)

  19. One project`s waste is another project`s resource

    Energy Technology Data Exchange (ETDEWEB)

    Short, J.

    1997-02-01

    The author describes the efforts being made toward pollution prevention within the DOE complex, as a way to reduce overall project costs, in addition to decreasing the amount of waste to be handled. Pollution prevention is a concept which is trying to be ingrained into project planning. Part of the program involves the concept that ultimately the responsibility for waste comes back to the generator. Parts of the program involve efforts to reuse materials and equipment on new projects, to recycle wastes to generate offsetting revenue, and to increase awareness, accountability and incentives so as to stimulate action on this plan. Summaries of examples are presented in tables.

  20. Laboratory of Corpuscular Physics - LPC Caen / Laboratoire de Physique Corpusculaire - LPC Caen. Report 2010-2011

    International Nuclear Information System (INIS)

    2012-01-01

    This report covers the period 2010-11 and describes the work of the LPC Caen in the areas of basic and applied research (including technology transfer) and the educational activities, including public outreach, undertaken by the staff and students. The laboratory's activities over the last two years have been characterised by the upgrading of existing equipment and projects and the launching of new ones to be conducted at major facilities in the coming years. These projects involve physics with radioactive beams (GANIL/SPIRAL1, SPIRAL2, ISAC-TRIUMF and RIBF-RIKEN), neutron beams (NFS-SPIRAL2) and ultra-cold neutrons (PSI), the analysis of data from NEMO-3, the SuperNEMO project, nuclear waste processing (GUINEVERE) and the treatment of cancer by hadron-therapy (ARCHADE). Existing and new projects in theory and phenomenology have also been pursued with success. Beyond supporting the projects listed above, the laboratory's technical staff have lead our continued participation in the construction of the SPIRAL2 facility, as well as developing new electronics and a digital data acquisition system, along with the development of detectors for dosimetry in partnership with private industry. All of these activities have been ably supported by the laboratory's administrative service. Content: 1 - Research: Nuclear physics (Nuclear structure, Nuclear dynamics and thermodynamics, Theoretical physics and phenomenology); Interdisciplinary research (Nuclear waste management, Medical and industrial applications); Fundamental interactions (Neutrinoless double beta decay, Towards a new measurement of the neutron Electric Dipole Moment, Precise correlation measurements in nuclear beta decay, LPC Magneto-Optical Trap); 2 - Administration and technical departments (Administrative and general services, Design office and mechanical workshop, Electronics and microelectronics, Computing services, Instrumentation, Documentation, Quality assurance and project support, Health and safety); 3

  1. Project Success in IT Project Management

    OpenAIRE

    Siddiqui, Farhan Ahmed

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. The criteria for project success need to be agreed by all parties before the start of the project and constantly reviewed as the project progresses. Assessing critical success factors is another ...

  2. Vague project start makes project success of outsourced software development projects uncertain

    OpenAIRE

    Savolainen, Paula

    2010-01-01

    peer-reviewed A definition of a project success includes at least three criteria: 1) meeting planning goals, 2) customer benefits, and 3) supplier benefits. This study aims to point out the importance of the definition of the project start, the project start date, and what work should be included in the project effort in order to ensure the supplier's benefits. The ambiguity of the project start risks the profitability of the project and therefore makes project success at least from suppli...

  3. Project management: a case of fixed price IS/IT projects. Analysis of projects by project scopes

    Directory of Open Access Journals (Sweden)

    Miroslav Kral

    2012-10-01

    Full Text Available The paper provides an overview of major issues of IS / IT projects. Attention will be focused on projects that are implemented under a contract for a specified amount of work and fixed price. The main purpose of the paper is to analyse the project parameters in terms of the types of projects, and to confirm, or refuse, a hypothesis related to this. There is some evidence from the portfolio of projects that have been implemented by the international companies providing IT services. Regarding the localisation, CEE region was selected for our research. The outputs of the paper should be a contribution to managing IS/IT projects in IT service delivery organizations and for the support of innovative thinking about project management generally.

  4. "Riesenrad" Ion Gantry for Hadron Therapy, 3

    OpenAIRE

    Benedikt, Michael; Bryant, P J; Holy, P; Pullia, M

    1999-01-01

    When using accelerator beams for cancer therapy, the three-dimensional freedom afforded by a gantry helps the treatment planner to spread out surface doses, avoid directions that intercept vital organs and irradiate a volume that is conformal with the tumour. The general preference is for an iso-centric gantry turning 360° in the vertical plane around the patient bed with sufficient space to be able to orientate the patient through 360° in the horizontal plane. For hadrontherapy, gantries are...

  5. Opening of material analysis beamline (BL-5) at NewSUBARU for industrial enterprises

    International Nuclear Information System (INIS)

    Hasegawa, Takayuki; Uemura, Masaharu; Tsurui, Takafumi; Shimizu, Masayoshi; Amemiya, Kenta; Fukushima, Sei; Ohta, Toshiaki; Motoyama, Muneyuki; Kanda, Kazuhiro

    2010-01-01

    A material analysis beamline for the industrial enterprises' use was completed at BL-5 of NewSUBARU synchrotron radiation facility in University of Hyogo in March 2008. BL-5 consists of two branch lines, one is a double crystal monochromator beamline (BL-5A) for the use in the higher-energy region (1300-4000 eV) and the other is a varied line spacing plane grating (VLSPG) monochromator beamline (BL-5B) for the use in the lower-energy region (50-1300 eV). These two branch lines can be operated simultaneously. BL-5 covers the soft X-ray region from 50 to 4000 eV and X-ray absorption spectrum can be measured with a high-energy resolution. The XAFS measurements in the total electron yield (TEY) and fluorescence yield (FLY) can be performed at BL-5A and BL-5B. In addition, the XPS spectra can be measured at BL-5B. BL-5 will be managed and maintained by the Synchrotron Analysis L.L.C. (SALLC), which is composed of the industrial companies, in cooperation with the staffs of the Laboratory of Advanced Science and Technology for Industry in University of Hyogo. Industrial users can be assisted by staffs of SALLC in the measurement at BL-5. (author)

  6. Report on energy saving vision in Santo-cho region; Santocho chiiki sho energy vision hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-02-01

    An energy-saving vision was decided on in Santo-cho region in Hyogo Prefecture, with its outline reported. This town is such that about 80% of the region is mountains, forests and wilderness and that aging is advancing at the rate above that of Hyogo Prefecture or the national average. Nearly entire energy of the town is dependent on the supply from outside. The energy consumption is somewhat increasing as a whole, with that of the people's livelihood/domestic sector and of transportation sector are rising. In the classification of fuels, electricity is growing in consumption. As an energy-saving vision, it aimed principally at personal surroundings in which every one got into the habit of saving energy continuously without being forced. The basic plan for the energy conservation drive consisted of inducement to an energy-saving life style, energy conservation to be spread by the next generation children, continuation of energy saving activity rooted in the region, and promotion of energy conservation as a basis for introducing new energy. The diffusion and enlightenment for children destined to lead the next generation were defined as a particularly important assignment, as was the promotion of energy conservation and environmental education. (NEDO)

  7. Managing project complexity : A study into adapting early project phases to improve project performance in large engineering projects

    NARCIS (Netherlands)

    Bosch-Rekveldt, M.G.C.

    2011-01-01

    Engineering projects become increasingly more complex and project complexity is assumed to be one of the causes for projects being delivered late and over budget. However, what this project complexity actually comprised of was unclear. To improve the overall project performance, this study focuses

  8. 地域スポーツクラブづくりにおける形成過程およびその取り組み--「NPO法人 スポーツクラブ エストレラ」6年間の歩み

    OpenAIRE

    高藤, 順; Jun, TAKAFUJI; 吉備国際大学社会学部スポーツ社会学科; Department of Sports Sociology, School of Sociology, KIBI International University

    2006-01-01

    "Formulating city identity" and "building a city through soccer" has been the fundamental concept of the Community Sports Club Estrela established in April, 2000 which will celebrate its sixth year next March. The members of a small committee for Promotion of Techinical Instructions of the Himeji City Hyogo Prefectural Football Associstion devised and developed an unique sports environment through bottom-up rather than top-down method of instruction. Initially this approach encountered variou...

  9. Spent Nuclear Fuel project, project management plan

    International Nuclear Information System (INIS)

    Fuquay, B.J.

    1995-01-01

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  10. Managing projects using a project management approach

    Directory of Open Access Journals (Sweden)

    Marko D. Andrejić

    2011-04-01

    Full Text Available Modern management theory treats all complex tasks and duties like projects and make these projects possible to be managed by a particular organizational-management concept in order to achieve a goal effectively. A large number of jobs and tasks performed in the system of defense or for defense purposes have the characteristics of projects. Project management is both a skill and a science of monitoring human, material, financial, energy and other resources to achieve required objectives within the given limits: deadlines, time, budget, possibility of realization and the satisfaction of the interests of all project participants. Project management is a traditional area of applied (or functional management focused on managing complex and uncertain situations with defined goals. Introduction In conditions of rapid change and high uncertainty, only adaptive organizations survive, i. e. those that are able not only to react quickly to changes but also to proactively take advantage of changes. Development of project management The biggest influence on the development of the area had complex jobs within the engineering profession. In parallel with the traditional approach new approaches began to develop, while the traditional one still remained in use. Contrary to the traditional engineering approach, a dynamic model first developed in order to respond to demands for greater control of costs. Project management Project management is a skill and knowledge of human and material resources to achieve set objectives within prescribed limits: deadlines, time, budget, possibility of realization, and the satisfaction of all participants in the project. In order to realize a project effectively, it is necessary to manage it rationally. Planning and project management A project plan is a document that allows all team members insight on where to go, when to start and when to arrive, what is necessary to be done in order to achieve the project objectives and what

  11. Views from the Frontline: A critical assessment of local risk governance in South Africa

    Directory of Open Access Journals (Sweden)

    Doret Botha

    2013-02-01

    Full Text Available In 2005 the United Nations International Strategy for Disaster Reduction introduced the ‘Hyogo Framework for Action’ (HFA aimed at mainstreaming disaster risk reduction. Subsequently, the ‘Global Network for Disaster Reduction’ (GNDR was formed to support the implementation of the HFA. The GNDR initiated a country-based, international research project called ‘Views from the Frontline’ (VFL in order to measure progress at local level in terms of compliance with the HFA. The VFL 2011 project focused on local risk governance, which is critical for effective implementation of policy and provision of resources at grassroots level. This article provides insight into the findings for South Africa. The project made use of quantitative and qualitative data. Quantitative data was gathered by means of a survey and/or questionnaire consisting of 20 questions on ‘indicators’ which assessed progress toward the goals of the HFA. The surveys also provided for qualitative commentary. The target population for this research consisted of local government officials and community representatives. Based on the quantitative scores for all the different indicators, the research showed that South Africa could still improve significantly in terms of compliance with the HFA. More attention must be given to operationalise the HFA at local level, a culture of safety must be fostered, local actors and communities must be involved directly and consulted, indigenous knowledge must be recognised, and significant capacity development for disaster risk reduction is necessary.

  12. Project management of life-science research projects: project characteristics, challenges and training needs.

    Science.gov (United States)

    Beukers, Margot W

    2011-02-01

    Thirty-four project managers of life-science research projects were interviewed to investigate the characteristics of their projects, the challenges they faced and their training requirements. A set of ten discriminating parameters were identified based on four project categories: contract research, development, discovery and call-based projects--projects set up to address research questions defined in a call for proposals. The major challenges these project managers are faced with relate to project members, leadership without authority and a lack of commitment from the respective organization. Two-thirds of the project managers indicated that they would be interested in receiving additional training, mostly on people-oriented, soft skills. The training programs that are currently on offer, however, do not meet their needs. Copyright © 2010 Elsevier Ltd. All rights reserved.

  13. Hadron-therapy: applications of accelerator technologies to tumour treatments

    CERN Multimedia

    CERN. Geneva

    2009-01-01

    In the second part the technologies of dose delivery are described emphasising the main challenges of modern radiotherapy, in particular the treatment of moving organs. In this framework the properties of the beams produced by conventional accelerators (cyclotrons and synchrotrons) are compared with the ones due to two novel approaches based on fast cycling machines, as FFAGs and cyclinacs.

  14. A Multiple-room, Continuous Beam Delivery, Hadron-therapy Installation

    Science.gov (United States)

    Méot, F.

    A proton-therapy hospital installation, based on multiple beam extraction systems from a fixed-field synchrotron, is presented and commented. Potential interest as hospital operation efficiency, as well as estimates of the impact of continuous, multiple-port extraction, on the cost of a session, are discussed.

  15. Impact of Project Leadership Facets on Project Outcome

    Directory of Open Access Journals (Sweden)

    Arslan Ayub

    2015-08-01

    Full Text Available The study analyzes the role of project leadership facets on effective project outcome. Numerous such initiatives have already been taken on project outcome/performance in the context of apposite leadership styles or project management. However, the current study is unique in the milieu of project outcome that it introduces a new leadership approach, which throws light on the significance of variant leadership facets on project outcome. The study uses explanatory approach; primary data is collected from project management professionals working in different project organizations. The study uses structural equation model (SEM technique to test the hypothesis. The study found a positive relationship between project leadership facets and project outcome.

  16. Project management in practice : Evaluating a case project through project management theories

    OpenAIRE

    Uusitalo, Jenni

    2013-01-01

    The purpose of this thesis was to evaluate a case project and to study whether it was carried out in a correct manner; meaning that did the case project follow the project management models. In addition, part of the study was to determine what could have been improved in the management of the case project. The case project was about creating and launching a communication channel based on a social media service, on a blog platform called Tumblr, for Team Finland in Spain network. The network p...

  17. FY 2000 report on the results of the joint research - Field test project on the photovoltaic power generation for public facility use; 2000 nendo kyodokenkyu gyomu seika hokokusho. Kokyo shisetsu you taiyoko hatsuden field test jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-05-01

    The paper arranged the FY 2000 results of the field test on the photovoltaic power generation for public facility use, etc. This report described in detail the results obtained at 237 places including the following: Social Welfare Corp. Seimei-kai, Kobe City (Hyogo Prefecture), Iitaka Town of Iinan County (Mie Prefecture), Kyushu Electric Safety Association, Educational Corp. Kongo Gakuen, Social Welfare Corp. Izumi-kai, Educational Corp. Shiobara Ikuei-kai, Educational Corp. Aiko Gakuen, Social Welfare Corp. Tachibana-kai, Cooperative Association Co-op Kobe, Social Welfare Corp. Hoshizuki-no-sato, Tochigi-Fuji Industrial Co., Hirabayashi Section of Gamo Town of Gamo County (Shiga Prefecture), Yanagawa City (Fukuoka Prefecture), Imadate City of Imadate County (Fukui Prefecture), Osaka Prefecture, Yamanashi Prefecture, Utazu Town of Ayauta County (Kagawa Prefecture), Educational Corp. Fukuyama Gakuen, New Energy Business Cooperative Association, Meitec Corp., Shikoku Medicom Co., Shizen Kobo Co., Educational Corp. Horikoshi Gakuen, Matama Town of Nishi-Kunisaki County (Oita Prefecture), Nio Town of Mitoyo County (Kagawa Prefecture), Educational Corp. Koshien Gakuin, Sansei Giken Co., Mitsui Greenland Co., AWI Mach Co., Nagoya City and Educational Corp. Kibogaoka Gakuen. (NEDO)

  18. Theme of the Workshop on Itinerant-Electron Magnetism, and Spin Fluctuations

    Science.gov (United States)

    Yoshimura, Kazuyoshi

    2017-06-01

    The international workshop on itinerant-electron magnetism was held during September 25-27, 2015 in the seminar house of Graduate School of Science, Kyoto University, Kyoto, Japan. Here, I explain the theme of this workshop, and stress the development of itinerant-electron magnetism in several decades. The workshop was also organized in commemoration of Professor Yoshinori Takahashi’s retirement from University of Hyogo, Japan. Here, I also explain some of his works contributing to the development of itinerant magnetism.

  19. 23 近年の地震における地震動強さと住家被害発生に関する検討

    OpenAIRE

    吉村, 昌宏; 藤原, 賢也; 岩橋, 平和; Masahiro, YOSHIMURA; Kenya, FUJIWARA; Toshikadu, IWAHASHI; 損害保険料率算出機構; 国際際航業株式会社防災情報部; 国際際航業株式会社防災情報部; Non-Life Insurance Rating Organization of Japan (NLIRO); Department of Disaster Mitigation, Kokusai Kogyo Co., Ltd.; Department of Disaster Mitigation, Kokusai Kogyo Co., Ltd.

    2005-01-01

    The strong ground motion observation network is rapidly maintained since the 1995 Hyogo-ken Nanbu earthquake, and the record of one's observations has been disclosed. Moreover, the damage situation of the earthquake in recent years is published on the homepage of the Fire and Disaster Management Agency. We made the data base of strong ground motion records and the damage situation of the earthquake from 1999 to 2004, and examined the relationship between JMA Instrumental Seismic Intensity and...

  20. 兵庫県南部地震で発生した強震域での加速度応答スペクトルの推定

    OpenAIRE

    佐藤, 忠信; 北, 勝利; 前田, 知就; 山下, 典彦

    1996-01-01

    The 1995 Hyogo-ken Nanbu Earthquake have adopted the seismic intensity of JMA(Japan Meteorological Agency) scale 7 since The 1948 Fukui Earthquake. Although the response spectrum is one of tools to grasp the basic reasons of structural damage we could not calculate it in the severely damaged area by this earthquake because observed records of ground motions were not enough near source region. Therefore, we calculated theoretical acceleration response spectra at the ground surface in the regio...

  1. Non-linear transient behavior during soil liquefaction based on re-evaluation of seismic records

    OpenAIRE

    Kamagata, S.; Takewaki, Izuru

    2015-01-01

    Focusing on soil liquefaction, the seismic records during the Niigata-ken earthquake in 1964, the southern Hyogo prefecture earthquake in 1995 and the 2011 off the Pacific coast of Tohoku earthquake are analyzed by the non-stationary Fourier spectra. The shift of dominant frequency in the seismic record of Kawagishi-cho during the Niigata-ken earthquake is evaluated based on the time-variant property of dominant frequencies. The reduction ratio of the soil stiffness is evaluated from the shif...

  2. Dose- and time-dependent gene expression alterations in prostate and colon cancer cells after in vitro exposure to carbon ion and X-irradiation

    Science.gov (United States)

    Suetens, Annelies; Moreels, Marjan; Quintens, Roel; Soors, Els; Buset, Jasmine; Chiriotti, Sabina; Tabury, Kevin; Gregoire, Vincent; Baatout, Sarah

    2015-01-01

    Hadrontherapy is an advanced form of radiotherapy that uses beams of charged particles (such as protons and carbon ions). Compared with conventional radiotherapy, the main advantages of carbon ion therapy are the precise absorbed dose localization, along with an increased relative biological effectiveness (RBE). This high ballistic accuracy of particle beams deposits the maximal dose to the tumor, while damage to the surrounding healthy tissue is limited. Currently, hadrontherapy is being used for the treatment of specific types of cancer. Previous in vitro studies have shown that, under certain circumstances, exposure to charged particles may inhibit cell motility and migration. In the present study, we investigated the expression of four motility-related genes in prostate (PC3) and colon (Caco-2) cancer cell lines after exposure to different radiation types. Cells were irradiated with various absorbed doses (0, 0.5 and 2 Gy) of accelerated 13C-ions at the GANIL facility (Caen, France) or with X-rays. Clonogenic assays were performed to determine the RBE. RT-qPCR analysis showed dose- and time-dependent changes in the expression of CCDC88A, FN1, MYH9 and ROCK1 in both cell lines. However, whereas in PC3 cells the response to carbon ion irradiation was enhanced compared with X-irradiation, the effect was the opposite in Caco-2 cells, indicating cell-type–specific responses to the different radiation types. PMID:25190155

  3. From project management to project leadership

    NARCIS (Netherlands)

    Braun, F.; Avital, M.

    2010-01-01

    It is virtually a truism that good leadership practices can help project managers with attaining the desired project outcome. However, a better understanding of which leadership practices enable project managers to be more effective warrants further investigation. Subsequently, in this study, we

  4. Ace Project as a Project Management Tool

    Science.gov (United States)

    Cline, Melinda; Guynes, Carl S.; Simard, Karine

    2010-01-01

    The primary challenge of project management is to achieve the project goals and objectives while adhering to project constraints--usually scope, quality, time and budget. The secondary challenge is to optimize the allocation and integration of resources necessary to meet pre-defined objectives. Project management software provides an active…

  5. Progress report 2000-2001; Rapport d'activite 2000-2001

    Energy Technology Data Exchange (ETDEWEB)

    Albrand, S; Carbonell, J; Chauvin, J; Compara, V; Crepe-Renaudin, S; Conto, J.M. de; Favro, C; Lleres, A; Merle, E; Quemener, G; Renault, C; Tur, C

    2001-07-01

    This document reports the activities of the ISN (nuclear sciences institute of Grenoble) for the 2 last years 2000, 2001. ISN's teams are involved in 3 research axis: elementary particles and hadrons, astro-particles and new systems for producing nuclear energy. In this document the activities have been classified into 18 topics: 1) the ATLAS experiment (detector for LHC), 2) the D0 experiment (electron identification and b-tagging), 3) the DELPHI experiment (R-parity violation), 4) the AMS experiment (embarked cosmic ray detector), 5) the cosmic microwave background (CMB), 6) the MUNU experiment (magnetic moment of antineutrinos), 7) the EUSO experiment (detection of the extreme energy cosmic rays), 8) 2 parity violation experiments (GO and SAMPLE), 9) the photo-production of mesons on proton (GRAAL), 10) a new isomeric state for Sb{sup 136}, 11) a new shape isomer for Kr{sup 72}, 12) new {mu}s isomers near Sn{sup 132}, 13) laser spectroscopy measurements for very neutron-rich tin isotopes, 14) hybrid demonstrator, 15) hadron-therapy (Etoile project), 16) positron emission tomography, 17) theories and models, and 18) technological work on accelerators and ion sources. (A.C.)

  6. Progress report 2000-2001; Rapport d'activite 2000-2001

    Energy Technology Data Exchange (ETDEWEB)

    Albrand, S.; Carbonell, J.; Chauvin, J.; Compara, V.; Crepe-Renaudin, S.; Conto, J.M. de; Favro, C.; Lleres, A.; Merle, E.; Quemener, G.; Renault, C.; Tur, C

    2001-07-01

    This document reports the activities of the ISN (nuclear sciences institute of Grenoble) for the 2 last years 2000, 2001. ISN's teams are involved in 3 research axis: elementary particles and hadrons, astro-particles and new systems for producing nuclear energy. In this document the activities have been classified into 18 topics: 1) the ATLAS experiment (detector for LHC), 2) the D0 experiment (electron identification and b-tagging), 3) the DELPHI experiment (R-parity violation), 4) the AMS experiment (embarked cosmic ray detector), 5) the cosmic microwave background (CMB), 6) the MUNU experiment (magnetic moment of antineutrinos), 7) the EUSO experiment (detection of the extreme energy cosmic rays), 8) 2 parity violation experiments (GO and SAMPLE), 9) the photo-production of mesons on proton (GRAAL), 10) a new isomeric state for Sb{sup 136}, 11) a new shape isomer for Kr{sup 72}, 12) new {mu}s isomers near Sn{sup 132}, 13) laser spectroscopy measurements for very neutron-rich tin isotopes, 14) hybrid demonstrator, 15) hadron-therapy (Etoile project), 16) positron emission tomography, 17) theories and models, and 18) technological work on accelerators and ion sources. (A.C.)

  7. Progress report 2000-2001

    International Nuclear Information System (INIS)

    Albrand, S.; Carbonell, J.; Chauvin, J.; Compara, V.; Crepe-Renaudin, S.; Conto, J.M. de; Favro, C.; Lleres, A.; Merle, E.; Quemener, G.; Renault, C.; Tur, C.

    2001-01-01

    This document reports the activities of the ISN (nuclear sciences institute of Grenoble) for the 2 last years 2000, 2001. ISN's teams are involved in 3 research axis: elementary particles and hadrons, astro-particles and new systems for producing nuclear energy. In this document the activities have been classified into 18 topics: 1) the ATLAS experiment (detector for LHC), 2) the D0 experiment (electron identification and b-tagging), 3) the DELPHI experiment (R-parity violation), 4) the AMS experiment (embarked cosmic ray detector), 5) the cosmic microwave background (CMB), 6) the MUNU experiment (magnetic moment of antineutrinos), 7) the EUSO experiment (detection of the extreme energy cosmic rays), 8) 2 parity violation experiments (GO and SAMPLE), 9) the photo-production of mesons on proton (GRAAL), 10) a new isomeric state for Sb 136 , 11) a new shape isomer for Kr 72 , 12) new μs isomers near Sn 132 , 13) laser spectroscopy measurements for very neutron-rich tin isotopes, 14) hybrid demonstrator, 15) hadron-therapy (Etoile project), 16) positron emission tomography, 17) theories and models, and 18) technological work on accelerators and ion sources. (A.C.)

  8. Projective-anticipating, projective and projective-lag synchronization of chaotic systems with time-varying delays

    International Nuclear Information System (INIS)

    Feng Cunfang; Guan Wei; Wang Yinghai

    2013-01-01

    We investigate different types of projective (projective-anticipating, projective and projective-lag) synchronization in unidirectionally nonlinearly coupled time-delayed chaotic systems with variable time delays. Based on the Krasovskii–Lyapunov approach, we find both the existence and sufficient stability conditions, using a general class of time-delayed chaotic systems related to optical bistable or hybrid optical bistable devices. Our method has the advantage that it requires only one nonlinearly coupled term to achieve different types of projective synchronization in time-delayed chaotic systems with variable time delays. Compared with other existing works, our result provides an easy way to achieve projective-anticipating, projective and projective-lag synchronization. Numerical simulations of the Ikeda system are given to demonstrate the validity of the proposed method. (paper)

  9. Introduction

    International Nuclear Information System (INIS)

    Jastrzebski, J.

    2007-01-01

    -ray spectra. An irradiation facility for radiobiological studies described in details in the last year Annual Report was also presented in a recent publication. Finally, after many years of unsuccessful applications, 50% of funds necessary for the acquisition of a new ECR ion source were allocated by the Ministry of Science and Higher Education at the end of 2006. At present commercial offers are evaluated. Besides running of the U-200P cyclotron, educational activity, development of new experimental tools, and participation in experiments using local and European facilities, the Laboratory team is strongly involved in many new projects. Basing on funds allocated by the Ministry of Scientific Research and Information Technology, International Atomic Energy Agency, and the Ministry of Health, the project of the installation in the Laboratory building of a second p/d cyclotron for the production of PET radiopharmaceuticals is in progress. The short history and current situation of this project is presented in the following pages of this report. The Laboratory is also involved in the Polish Hadron-Therapy Consortium, contributing to the preparation of the project of the National Hadron-Therapy Center in Warsaw. European Structural Funds allocated to Poland for 2007-2013 open a possibility to acquire funds for realization of such an initiative. Basing on the same source of funding, plus the resources of 7FP, the Laboratory launched the idea of the preparatory program for constructing in Poland a demonstration facility for High Temperature Nuclear Reactor in synergy with coal. The Consortium of Polish Universities and industrial partners was organized. The project was accepted by Polish Government and placed in the first place of the list of Large Projects in the '' Innovative Economy Programme ''. It will be discussed with European Commission. More information on this project can be found on the Laboratory web pages. (author)

  10. Project Success in Agile Development Software Projects

    Science.gov (United States)

    Farlik, John T.

    2016-01-01

    Project success has multiple definitions in the scholarly literature. Research has shown that some scholars and practitioners define project success as the completion of a project within schedule and within budget. Others consider a successful project as one in which the customer is satisfied with the product. This quantitative study was conducted…

  11. An IS Project Management Course Project

    Science.gov (United States)

    Frank, Ronald L.

    2010-01-01

    Information Systems curricula should provide project management (PM) theory, current practice, and hands-on experience. The schedule usually does not allow time in Analysis and Design courses for development oriented project management instruction other than a short introduction. Similarly, networking courses usually don't put project management…

  12. Evaluation of Project Achievements in VOMARE -project

    OpenAIRE

    Kokkarinen, Eeva

    2011-01-01

    The purpose of the thesis is to study the achievements of VOMARE –project from the Finnish Lifeboat Institutions perspective. The organisation is a roof organisation for voluntary maritime rescue operation in Finland. The Finnish Lifeboat Institution is a lead partner in VOMARE –project which is EU funded project and the aim of the project is to start voluntary rescue operations in Estonia. The theoretical part of the work is divided into two main categories; project management and planni...

  13. Leading global projects for professional and accidental project leaders

    CERN Document Server

    Moran, Robert T

    2008-01-01

    This book is a must-read for anyone responsible for projects and initiatives that span functional and geographical divides. Authors Moran and Youngdahl bring extensive experience and learning from industry practice to present a clear and straightforward treatment of the leadership skills and knowledge required to lead projects that are global in nature. They have written the first book of its kind to address the three essential skills of global project leaders - strategic project management, project leadership, and cross-cultural leadership. The authors argue that global project leadership is an essential skill in our project-based world and that we are all either intentional or accidental project leaders. Intentional project leaders pursue formal project management education and even certification whereas accidental project leaders find themselves leading global projects and initiatives as a result of a special assignment or promotion. Moran and Youndahl have found that the vast majority of global projects ...

  14. Medical applications of accelerators

    CERN Document Server

    Rossi, Sandro

    1998-01-01

    At Present, about five thousands accelerators are devoted to biomedical applications. They are mainly used in radiotherapy, research and medical radioisotopes production. In this framework oncological hadron-therapy deserves particular attention since it represents a field in rapid evolution thanks to the joint efforts of laboratories with long experiences in particle physics. It is the case of CERN where the design of an optimised synchrotron for medical applications has been pursued. These lectures present these activities with particular attention to the new developments which are scientifically interesting and/or economically promising.

  15. Development of a Compton camera for medical applications based on silicon strip and scintillation detectors

    Energy Technology Data Exchange (ETDEWEB)

    Krimmer, J., E-mail: j.krimmer@ipnl.in2p3.fr [Institut de Physique Nucléaire de Lyon, Université de Lyon, Université Lyon 1, CNRS/IN2P3 UMR 5822, 69622 Villeurbanne cedex (France); Ley, J.-L. [Institut de Physique Nucléaire de Lyon, Université de Lyon, Université Lyon 1, CNRS/IN2P3 UMR 5822, 69622 Villeurbanne cedex (France); Abellan, C.; Cachemiche, J.-P. [Aix-Marseille Université, CNRS/IN2P3, CPPM UMR 7346, 13288 Marseille (France); Caponetto, L.; Chen, X.; Dahoumane, M.; Dauvergne, D. [Institut de Physique Nucléaire de Lyon, Université de Lyon, Université Lyon 1, CNRS/IN2P3 UMR 5822, 69622 Villeurbanne cedex (France); Freud, N. [Université de Lyon, CREATIS, CNRS UMR5220, Inserm U1044, INSA - Lyon, Université Lyon 1, Centre Léon Bérard (France); Joly, B.; Lambert, D.; Lestand, L. [Clermont Université, Université Blaise Pascal, CNRS/IN2P3, Laboratoire de Physique Corpusculaire, BP 10448, F-63000 Clermont-Ferrand (France); Létang, J.M. [Université de Lyon, CREATIS, CNRS UMR5220, Inserm U1044, INSA - Lyon, Université Lyon 1, Centre Léon Bérard (France); Magne, M. [Clermont Université, Université Blaise Pascal, CNRS/IN2P3, Laboratoire de Physique Corpusculaire, BP 10448, F-63000 Clermont-Ferrand (France); and others

    2015-07-01

    A Compton camera is being developed for the purpose of ion-range monitoring during hadrontherapy via the detection of prompt-gamma rays. The system consists of a scintillating fiber beam tagging hodoscope, a stack of double sided silicon strip detectors (90×90×2 mm{sup 3}, 2×64 strips) as scatter detectors, as well as bismuth germanate (BGO) scintillation detectors (38×35×30 mm{sup 3}, 100 blocks) as absorbers. The individual components will be described, together with the status of their characterization.

  16. Characterization of the proton beam from an IBA Cyclone 18/9 with radiochromic film EBT2

    Energy Technology Data Exchange (ETDEWEB)

    Sansaloni, F.; Lagares, J. I.; Arce, P.; Llop, J.; Perez, J. M. [Medical Applications Unit, Technology Department, CIEMAT, Madrid (Spain); Radiochemistry Department, Molecular Imaging unit, CIC-biomaGUNE, San Sebastian (Spain); Technology Department, CIEMAT (Spain)

    2012-12-19

    The use of radiochromic films is widespread in different areas of medical physics like radiotherapy and hadrontherapy; however, radiochromic films have been scarcely used in the characterization of proton or deuteron beams generated in biomedical cyclotrons. In this paper the radiochromic film EBT2 was used to study the beam size and the proton beam energy of an IBA Cyclone 18/9 cyclotron. The results indicate that the beam size can be easily measured at a very low expense; however, an accurate determination of the beam energy might require the implementation of certain experimental improvements.

  17. Prioritising Project Scope Definition Elements in Public Building Projects

    Directory of Open Access Journals (Sweden)

    Mohammed K Fageha

    2014-09-01

    Full Text Available A complete definition of the scope of a project upfront during early stages ensures smooth and successful implementation during the project execution. This research identifies and prioritises project scope definition elements for public buildings in Saudi Arabia. Elements that could significantly contribute to complete project scope definition package at pre-project planning stage are identified and their interrelationship determined and prioritised. Using the Project Definition Rating Index (PDRI as a basis, the study uses analytical network process (ANP technique based on data obtained from project managers who have been involved in public sector projects in Saudi Arabia. Data collection and analysis was conducted in three steps. The first step involved identification of scope definition elements while the second involved an investigation into interrelationships among the elements. In the third step, ANP was used to determine the weight of the elements’ importance in terms of contribution to project scope definition completeness. Finally, Pareto analysis was used to prioritise and assess the distribution pattern of the elements. The outcome from this research is the prioritisation of project scope definition elements for public building projects in Saudi Arabia. The prioritised list developed indicates the importance of project scope definition elements. It should help project management teams identify elements to consider when evaluating project scope definition for completeness at the pre-project planning stage. Keywords: Project scope definition, pre-project planning, prioritising, public building projects, Saudi Arabia, Analytical Network Process (ANP

  18. The application of project management in construction projects ...

    African Journals Online (AJOL)

    Project management is critical for successful project development. A crucial responsibility of the project manager is ensuring that the client is certified and the scope of work is of high quality, within the agreed budget and time frame. In some way, project financing is completed from the time of project conception. Indeed ...

  19. Purtscher's retinopathy followed by neovascular glaucoma

    Directory of Open Access Journals (Sweden)

    Kuroda M

    2013-11-01

    Full Text Available Masasko Kuroda,1 Akihiro Nishida,1 Masashi Kikuchi,2 Yasuo Kurimoto11Department of Ophthalmology, Kobe City Medical Center General Hospital, Kobe, Hyogo, Japan; 2Kikuchi Eye Clinic, Kobe, Hyogo, JapanAbstract: We report the case of a 66-year-old Japanese man who developed neovascular glaucoma secondary to Purtscher's retinopathy following a head injury. The patient presented at our hospital with blurred vision and a visual field abnormality in his left eye 1 month after suffering from a head injury. Upon initial presentation, his best-corrected visual acuity on a decimal chart was 1.5 oculus dexter and 0.6 oculus sinister. The intraocular pressure (IOP was 12 mmHg in both eyes. Fundus examination of the left eye revealed multiple white lesions in the posterior pole. Optical coherence tomography demonstrated retinal edema, particularly in the inner retina. On the basis of these findings, a diagnosis of Purtscher's retinopathy was made. One month after the initial examination, the visual acuity in the left eye deteriorated to 0.01 in decimal chart, and the IOP increased to 37 mmHg. Gonioscopy showed angle neovascularization. The patient received an intravitreal bevacizumab injection and panretinal photocoagulation. Subsequently, the IOP normalized and the angle neovascularization regressed.Keywords: blurred vision, visual field, retinal edema, head injury, head trauma

  20. Field note from Pakistan floods: Preventing future flood disasters

    Directory of Open Access Journals (Sweden)

    Marcus Oxley

    2011-04-01

    Full Text Available Unusually heavy monsoon rains in Northern Pakistan have caused disproportionate levels of extreme flooding and unprecedented flood losses across the entire Indus River basin. Extensive land use changes and environmental degradation in the uplands and lowlands of the river basin together with the construction of a “built environment” out of balance with the functioning, capacities, scale and limits of the local ecosystems have exposed millions of people to an increased risk of extreme #ooding. The catastrophic nature of the August #ooding provides a unique opportunity to fundamentally change Pakistan’s current socio-economic development path by incorporating disaster risk reduction and climate change measures into the post-disaster recovery process to rebuild a safer, more resilient nation. In January 2005 one hundred and sixty-eight nations adopted the Hyogo Framework for Action (HFA2005-2015 to bring about a “substantial reduction in disaster losses” by 2015. Despite this global initiative a series of major disasters, including the recent flooding in Pakistan, all indicate that we are not on track to achieve the substantial reduction of disaster losses. The following fieldnote considers what can be done to accelerate progress towards implementation of the Hyogo Framework, drawing on insights and lessons learnt from the August flooding to understand how Pakistan and neighbouring countries can prevent a repeat of such catastrophic disasters in future years.

  1. Perspectives on projects, project success and team work

    OpenAIRE

    Thompson, Karen

    2015-01-01

    This paper brings together perspectives on projects, project success and team work as a background to two graphical tools for considering project success and individual capabilities for working in a project team.

  2. Project Management Yinyang: Coupling project success and client satisfaction

    Directory of Open Access Journals (Sweden)

    Greg Stewart Usher

    2017-06-01

    Full Text Available Our research applies paradox theory to a project management construct to help project management researchers and practitioners understand the tensions that can exist between project success and client satisfaction. Our research highlights that although project success and client satisfaction are both present within a project management construct, they also belong to different functional systems. Project success and client satisfaction have different systemic-discourses and use different language games to convey information. These distinctions can create latent and sometimes salient tensions within the project management construct that project managers must understand, embrace, and work with. We have used a Grounded Theory (GT methodology to explore the lived experience of project managers, and from this have identified a phenomenon which we have termed project management yinyang. Project management yinyang is the state that exists when both project success and Client satisfaction are tightly coupled within the project management construct. Project management yinyang highlights that these two phenomena cannot be viewed as separate elements because the ‘seed’ of each exists within the other. And to truly achieve one, you must also achieve the other. Our findings indicate that in order to create project management yinyang the project manager must embrace a paradoxical yet holistic philosophy. They must understand the complementarity, interdependency, and structural coupling that exists between the positivist and interpretivist paradigms within the project management construct. They must understand how satisfaction (Yin and success (Yang are created through focus. Furthermore, they must understand how project management yinyang is separate from, but borne from, the convergence of the other two elements.

  3. Quality Assurance Project Plan for Citizen Science Projects

    Science.gov (United States)

    The Quality Assurance Project Plan is necessary for every project that collects or uses environmental data. It documents the project planning process and serves as a blueprint for how your project will run.

  4. Project Management

    DEFF Research Database (Denmark)

    Pilkington, Alan; Chai, Kah-Hin; Le, Yang

    2015-01-01

    This paper identifies the true coverage of PM theory through a bibliometric analysis of the International Journal of Project Management from 1996-2012. We identify six persistent research themes: project time management, project risk management, programme management, large-scale project management......, project success/failure and practitioner development. These differ from those presented in review and editorial articles in the literature. In addition, topics missing from the PM BOK: knowledge management project-based organization and project portfolio management have become more popular topics...

  5. Project financing

    International Nuclear Information System (INIS)

    Cowan, A.

    1998-01-01

    Project financing was defined ('where a lender to a specific project has recourse only to the cash flow and assets of that project for repayment and security respectively') and its attributes were described. Project financing was said to be particularly well suited to power, pipeline, mining, telecommunications, petro-chemicals, road construction, and oil and gas projects, i.e. large infrastructure projects that are difficult to fund on-balance sheet, where the risk profile of a project does not fit the corporation's risk appetite, or where higher leverage is required. Sources of project financing were identified. The need to analyze and mitigate risks, and being aware that lenders always take a conservative view and gravitate towards the lowest common denominator, were considered the key to success in obtaining project financing funds. TransAlta Corporation's project financing experiences were used to illustrate the potential of this source of financing

  6. Wisdom for Building the Project Manager/Project Sponsor Relationship: Partnership for Project Success

    National Research Council Canada - National Science Library

    Patton, Nanette; Shechet, Allan

    2007-01-01

    .... This article discusses conventional roles and responsibilities of the project sponsor and then discusses strategies a project manager can employ to define boundaries to reduce role confusion and promote partnership to facilitate project success.

  7. From science to industrial technology. NewSUBARU's initiative

    International Nuclear Information System (INIS)

    Ando, A.

    2004-01-01

    The NewSUBARU synchrotron radiation facility is constructed to enhance domestic industries in Hyogo prefecture with high technology and to develop new light sources. NewSUBARU is now pushing up activities in industrial micro fabrication in the world and will make a breakthrough in commercial mass production with synchrotron radiation. The negative alpha-p operation of the storage ring gives good opportunities not only for new understandings of beam physics but also for coherent mm-wave light by very short electron bunches. (author)

  8. Pump Damage in the Hanshin Earthquake

    Directory of Open Access Journals (Sweden)

    Toshiyuki Osada

    2000-01-01

    Full Text Available There was a severe earthquake in the southern area ofHyogo prefecture in Japan on January 17, 1995. In this paper the damage to pump facilities caused by the earthquake, based on field investigation results in the Hanshin (Osaka–Kobe area is reported. In particular a lot of damage was reported in the pumping facilities for sewage or drainage of storm sewage. This paper also presents recommendations for aseismic design of pump facilities based on the results of the survey.

  9. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    Fix, N.J.

    2008-01-01

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff

  10. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-11-30

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  11. Project structure plan requirements for the deconstruction projects

    International Nuclear Information System (INIS)

    Petrasch, Peter; Schmitt, Christian; Stapf, Meike

    2011-01-01

    The deconstruction of nuclear facilities requires due to the particular conditions and the size of the project a special project planning. The authors analyze the possible requirements to be fulfilled by a project structure plan for nuclear facilities, including personnel resources, organization structure, budget questions, operation and project oriented measures, possibility of modifications and supplements. Further topics include controlling and project realization procedures, documentation, third party activities (authorities, consultants, surveyors), logistics and transport, and radiation protection issues. Several questions remain for plants-specific planning, including the integration of the plant personnel, administrative work, project management, economic and financial issues, radioactive waste management issues.

  12. Adapting Project Management Practices to Research-Based Projects

    Science.gov (United States)

    Bahr, P.; Baker, T.; Corbin, B.; Keith, L.; Loerch, L.; Mullenax, C.; Myers, R.; Rhodes, B.; Skytland, N.

    2007-01-01

    From dealing with the inherent uncertainties in outcomes of scientific research to the lack of applicability of current NASA Procedural Requirements guidance documentation, research-based projects present challenges that require unique application of classical project management techniques. If additionally challenged by the creation of a new program transitioning from basic to applied research in a technical environment often unfamiliar with the cost and schedule constraints addressed by project management practices, such projects can find themselves struggling throughout their life cycles. Finally, supplying deliverables to a prime vehicle customer, also in the formative stage, adds further complexity to the development and management of research-based projects. The Biomedical Research and Countermeasures Projects Branch at NASA Johnson Space Center encompasses several diverse applied research-based or research-enabling projects within the newly-formed Human Research Program. This presentation will provide a brief overview of the organizational structure and environment in which these projects operate and how the projects coordinate to address and manage technical requirements. We will identify several of the challenges (cost, technical, schedule, and personnel) encountered by projects across the Branch, present case reports of actions taken and techniques implemented to deal with these challenges, and then close the session with an open forum discussion of remaining challenges and potential mitigations.

  13. Organization of BSc and MSc projects in project families

    DEFF Research Database (Denmark)

    Ottosen, Lisbeth M.; Goltermann, Per; Jensen, Pernille Erland

    2014-01-01

    This work reports organization of student thesis projects in project families, with the benefit to both teaching and learning. The project organization went from student projects broadly distributed on topics related to different research issues and individual supervision to project families with...

  14. Project studies

    DEFF Research Database (Denmark)

    Geraldi, Joana; Söderlund, Jonas

    2018-01-01

    Project organising is a growing field of scholarly inquiry and management practice. In recent years, two important developments have influenced this field: (1) the study and practice of projects have extended their level of analysis from mainly focussing on individual projects to focussing on micro......, and of the explanations of project practices they could offer. To discuss avenues for future research on projects and project practice, this paper suggests the notion of project studies to better grasp the status of our field. We combine these two sets of ideas to analyse the status and future options for advancing...... project research: (1) levels of analysis; and (2) type of research. Analysing recent developments within project studies, we observe the emergence of what we refer to as type 3 research, which reconciles the need for theoretical development and engagement with practice. Type 3 research suggests pragmatic...

  15. On southern Hyogo-prefecture earthquake and some related activities in Japan

    International Nuclear Information System (INIS)

    Shibata, H.

    1995-01-01

    This paper consists of three parts. At first the reporter discusses on the earthquake event on January 17, 1995, and then on the summary of the report of examining the adequacy of the guideline of seismic design of nuclear power plants in Japan by the task group, Nuclear Safety Commission. And also on the activity of 'the sub-committee on the research of seismic safety' for the future research subjects during 1996-2000 F.Y. (author)

  16. Multiple levels in the organisation of innovation : project organization in single-firm projects and multi-firm projects

    NARCIS (Netherlands)

    Jaspers, F.P.H.; Ende, van den J.C.M.; Borgh, van der W.; Yin, Jie

    2008-01-01

    Studies about how the organization of new product (and new service) development projects (NPD) projects influences project performance typically investigate this in Single-firm projects, i.e. projects with high ownership integration. However, NPD projects are often performed by two or more

  17. Research Project Evaluation-Learnings from the PATHWAYS Project Experience.

    Science.gov (United States)

    Galas, Aleksander; Pilat, Aleksandra; Leonardi, Matilde; Tobiasz-Adamczyk, Beata

    2018-05-25

    Every research project faces challenges regarding how to achieve its goals in a timely and effective manner. The purpose of this paper is to present a project evaluation methodology gathered during the implementation of the Participation to Healthy Workplaces and Inclusive Strategies in the Work Sector (the EU PATHWAYS Project). The PATHWAYS project involved multiple countries and multi-cultural aspects of re/integrating chronically ill patients into labor markets in different countries. This paper describes key project's evaluation issues including: (1) purposes, (2) advisability, (3) tools, (4) implementation, and (5) possible benefits and presents the advantages of a continuous monitoring. Project evaluation tool to assess structure and resources, process, management and communication, achievements, and outcomes. The project used a mixed evaluation approach and included Strengths (S), Weaknesses (W), Opportunities (O), and Threats (SWOT) analysis. A methodology for longitudinal EU projects' evaluation is described. The evaluation process allowed to highlight strengths and weaknesses and highlighted good coordination and communication between project partners as well as some key issues such as: the need for a shared glossary covering areas investigated by the project, problematic issues related to the involvement of stakeholders from outside the project, and issues with timing. Numerical SWOT analysis showed improvement in project performance over time. The proportion of participating project partners in the evaluation varied from 100% to 83.3%. There is a need for the implementation of a structured evaluation process in multidisciplinary projects involving different stakeholders in diverse socio-environmental and political conditions. Based on the PATHWAYS experience, a clear monitoring methodology is suggested as essential in every multidisciplinary research projects.

  18. Project financing

    International Nuclear Information System (INIS)

    Alvarez, M.U.

    1990-01-01

    This paper presents the basic concepts and components of the project financing of large industrial facilities. Diagrams of a simple partnership structure and a simple leveraged lease structure are included. Finally, a Hypothetical Project is described with basic issues identified for discussion purposes. The topics of the paper include non-recourse financing, principal advantages and objectives, disadvantages, project financing participants and agreements, feasibility studies, organization of the project company, principal agreements in a project financing, insurance, and an examination of a hypothetical project

  19. Project Notes

    Science.gov (United States)

    School Science Review, 1978

    1978-01-01

    Presents sixteen project notes developed by pupils of Chipping Norton School and Bristol Grammar School, in the United Kingdom. These Projects include eight biology A-level projects and eight Chemistry A-level projects. (HM)

  20. Project Management and the Project Manager: A Strategy for ...

    African Journals Online (AJOL)

    International Journal of Development and Management Review ... collapse, project failure, project abandonment, project cost and time overruns, etc. ... component parts that constitute project management in the building construction industry.

  1. Locale-Specific Categorization of IT Projects for Proper Project Management

    Directory of Open Access Journals (Sweden)

    Muhammad Nasir

    2015-12-01

    Full Text Available In this paper we aim to show that not only are the project management techniques important for small-scale projects, but following proper project management techniques is one of the most important requirements. However, there come slight variations in implementing project management techniques in small projects as compared with larger projects. Therefore, proper categorization of projects holds the key to success in many situations. Our paper will show that categorization of a project as small-scale or large-scale should always be locale specific. In this regards, we develop a criteria and evaluate how the projects are categorized as small-scale and large-scale in different parts of the world with focus on IT projects. This research concludes that some methods cannot be used for projects of different scales.

  2. Clinical and Research Activities at the CATANA Facility of INFN-LNS: From the Conventional Hadrontherapy to the Laser-Driven Approach.

    Science.gov (United States)

    Cirrone, Giuseppe A P; Cuttone, Giacomo; Raffaele, Luigi; Salamone, Vincenzo; Avitabile, Teresio; Privitera, Giuseppe; Spatola, Corrado; Margarone, Daniele; Patti, Valeria; Petringa, Giada; Romano, Francesco; Russo, Andrea; Russo, Antonio; Sabini, Maria G; Scuderi, Valentina; Schillaci, Francesco; Valastro, Lucia M

    2017-01-01

    The CATANA proton therapy center was the first Italian clinical facility making use of energetic (62 MeV) proton beams for the radioactive treatment of solid tumors. Since the date of the first patient treatment in 2002, 294 patients have been successful treated whose majority was affected by choroidal and iris melanomas. In this paper, we report on the current clinical and physical status of the CATANA facility describing the last dosimetric studies and reporting on the last patient follow-up results. The last part of the paper is dedicated to the description of the INFN-LNS ongoing activities on the realization of a beamline for the transport of laser-accelerated ion beams for future applications. The ELIMED (ELI-Beamlines MEDical and multidisciplinary applications) project is introduced and the main scientific aspects will be described.

  3. Clinical and Research Activities at the CATANA Facility of INFN-LNS: From the Conventional Hadrontherapy to the Laser-Driven Approach

    Science.gov (United States)

    Cirrone, Giuseppe A. P.; Cuttone, Giacomo; Raffaele, Luigi; Salamone, Vincenzo; Avitabile, Teresio; Privitera, Giuseppe; Spatola, Corrado; Amico, Antonio G.; Larosa, Giuseppina; Leanza, Renata; Margarone, Daniele; Milluzzo, Giuliana; Patti, Valeria; Petringa, Giada; Romano, Francesco; Russo, Andrea; Russo, Antonio; Sabini, Maria G.; Schillaci, Francesco; Scuderi, Valentina; Valastro, Lucia M.

    2017-01-01

    The CATANA proton therapy center was the first Italian clinical facility making use of energetic (62 MeV) proton beams for the radioactive treatment of solid tumors. Since the date of the first patient treatment in 2002, 294 patients have been successful treated whose majority was affected by choroidal and iris melanomas. In this paper, we report on the current clinical and physical status of the CATANA facility describing the last dosimetric studies and reporting on the last patient follow-up results. The last part of the paper is dedicated to the description of the INFN-LNS ongoing activities on the realization of a beamline for the transport of laser-accelerated ion beams for future applications. The ELIMED (ELI-Beamlines MEDical and multidisciplinary applications) project is introduced and the main scientific aspects will be described. PMID:28971066

  4. Clinical and Research Activities at the CATANA Facility of INFN-LNS: From the Conventional Hadrontherapy to the Laser-Driven Approach

    Directory of Open Access Journals (Sweden)

    Giuseppe A. P. Cirrone

    2017-09-01

    Full Text Available The CATANA proton therapy center was the first Italian clinical facility making use of energetic (62 MeV proton beams for the radioactive treatment of solid tumors. Since the date of the first patient treatment in 2002, 294 patients have been successful treated whose majority was affected by choroidal and iris melanomas. In this paper, we report on the current clinical and physical status of the CATANA facility describing the last dosimetric studies and reporting on the last patient follow-up results. The last part of the paper is dedicated to the description of the INFN-LNS ongoing activities on the realization of a beamline for the transport of laser-accelerated ion beams for future applications. The ELIMED (ELI-Beamlines MEDical and multidisciplinary applications project is introduced and the main scientific aspects will be described.

  5. Managing Projects for Change: Contextualised Project Management

    Science.gov (United States)

    Tynan, Belinda; Adlington, Rachael; Stewart, Cherry; Vale, Deborah; Sims, Rod; Shanahan, Peter

    2010-01-01

    This paper will detail three projects which focussed on enhancing online learning at a large Australian distance education University within a School of Business, School of Health and School of Education. Each project had special funding and took quite distinctive project management approaches, which reflect the desire to embed innovation and…

  6. Improving Project Portfolio Management (PPM) for Improvement Projects

    DEFF Research Database (Denmark)

    Pries-Heje, Jan; Jakobsen, Peter M.; Korsaa, Morten

    2017-01-01

    Project Portfolio Management (PPM) focus on the integration and alignment of projects with the business operation in order to achieve most value and cost-efficiency for the investment in projects. PPM is often a challenge and especially so for improvement projects where PPM is considerably...... of evaluating a portfolio of improvement projects and combine this evaluation with the effect they have on the CMMI maturity level. Further, the paper demonstrates how the combination of a strong senior management requirement for improved maturity and the focus on getting the most value out of PPM made...

  7. Project planning and project management of Baseball II-T

    International Nuclear Information System (INIS)

    Kozman, T.A.; Chargin, A.K.

    1975-01-01

    The details of the project planning and project management work done on the Baseball II-T experiment are reviewed. The LLL Baseball program is a plasma confinement experiment accomplished with a superconducting magnet in the shape of a baseball seam. Both project planning and project management made use of the Critical Path Management (CPM) computer code. The computer code, input, and results from the project planning and project management runs, and the cost and effectiveness of this method of systems planning are discussed

  8. Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

    Energy Technology Data Exchange (ETDEWEB)

    Burritt, James G.; Berkey, Edgar [Longenecker and Associates, Las Vegas, NV 89135 (United States)

    2012-07-01

    Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

  9. Environmental Science: 49 Science Fair Projects. Science Fair Projects Series.

    Science.gov (United States)

    Bonnet, Robert L.; Keen, G. Daniel

    This book contains 49 science fair projects designed for 6th to 9th grade students. Projects are organized by the topics of soil, ecology (projects in habitat and life cycles), pests and controls (projects in weeds and insects), recycling (projects in resources and conservation), waste products (projects in decomposition), microscopic organisms,…

  10. Project descriptions

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    This part specifies the activities and project tasks of each project broken down according to types of financing, listing the current projects Lw 1 through 3 funded by long-term provisions (budget), the current projects LB 1 and 2, LG 1 through 5, LK1, LM1, and LU 1 through 6 financed from special funds, and the planned projects ZG 1 through 4 and ZU 1, also financed from special funds. (DG) [de

  11. Project Communication in Functions, Process and Project-Oriented Industiral Companies

    Science.gov (United States)

    Samáková, Jana; Koltnerová, Kristína; Rybanský, Rudolf

    2012-12-01

    The article is focused on the project communication management. Industrial enterprises, which use project management must constantly search the new ways for improving. One of the possibilities is the change of management from a functional oriented to the projectoriented or process-oriented. Process-oriented and project-oriented companies have better project communication management during the all project life cycle. Communication in the project is a very important factor. According to the arguments of several authors, one of the biggest problem is that threaten the success of the project is just the communication. In each project is an important pillar - and that is communication. Only on the base of communication can the project move forward and achieve the target.

  12. Research Project Evaluation—Learnings from the PATHWAYS Project Experience

    Directory of Open Access Journals (Sweden)

    Aleksander Galas

    2018-05-01

    Full Text Available Background: Every research project faces challenges regarding how to achieve its goals in a timely and effective manner. The purpose of this paper is to present a project evaluation methodology gathered during the implementation of the Participation to Healthy Workplaces and Inclusive Strategies in the Work Sector (the EU PATHWAYS Project. The PATHWAYS project involved multiple countries and multi-cultural aspects of re/integrating chronically ill patients into labor markets in different countries. This paper describes key project’s evaluation issues including: (1 purposes, (2 advisability, (3 tools, (4 implementation, and (5 possible benefits and presents the advantages of a continuous monitoring. Methods: Project evaluation tool to assess structure and resources, process, management and communication, achievements, and outcomes. The project used a mixed evaluation approach and included Strengths (S, Weaknesses (W, Opportunities (O, and Threats (SWOT analysis. Results: A methodology for longitudinal EU projects’ evaluation is described. The evaluation process allowed to highlight strengths and weaknesses and highlighted good coordination and communication between project partners as well as some key issues such as: the need for a shared glossary covering areas investigated by the project, problematic issues related to the involvement of stakeholders from outside the project, and issues with timing. Numerical SWOT analysis showed improvement in project performance over time. The proportion of participating project partners in the evaluation varied from 100% to 83.3%. Conclusions: There is a need for the implementation of a structured evaluation process in multidisciplinary projects involving different stakeholders in diverse socio-environmental and political conditions. Based on the PATHWAYS experience, a clear monitoring methodology is suggested as essential in every multidisciplinary research projects.

  13. Overview of novel techniques for radiation protection and dosimetry

    International Nuclear Information System (INIS)

    Agosteo, Stefano

    2010-01-01

    Generally, the main approaches for assessing the radiation protection (RP) quantities in neutron fields are: i) the use of an instrument with a response to the protection quantity quasi-independent of energy; ii) neutron spectrometry; iii) microdosimetry. The techniques based on the first approach include rem-meters, superheated emulsions and the electronic personal dosemeters. Passive rem-meters have recently been developed for assessing the ambient dose equivalent in pulsed neutron fields around particle accelerators for hadrontherapy and research. Most of these instruments are characterised by a response extended to high-energies (up to a few GeV). An example is given by the GSI-ball, which employs a pair of LiF TLDs as a thermal neutron detector. It is likely that passive instruments will play a fundamental role also for monitoring the neutron fields generated by ultra-high intensity lasers, where the duration of a single pulse is of the order of hundreds femtoseconds. Arrays of tissue-equivalent proportional counters (TEPCs) of a millimetric/sub-millimetric physical size have been developed both for assessing the quality of therapeutic radiation beams and for estimating the RP quantities in low-intensity fields, which may limit the use of conventional microdosemeters. Very satisfactory results were obtained with GEM-based TEPCs and gas microstrip detectors (GMDs). Moreover, mini-TEPCs have been constructed and tested for measuring the quality of hadrontherapy beams (BNCT included). Silicon microdosemeters have also been demonstrated to be very promising for characterizing proton and ion beams for radiation therapy and for estimating the occurrence of single event effects in space applications.

  14. Realization of a scanning ion beam monitor; Realisation d'un dispositif de controle et d'imagerie de faisceaux balayes d'ions

    Energy Technology Data Exchange (ETDEWEB)

    Pautard, C

    2008-07-15

    During this thesis, a scanning ion beam monitor has been developed in order to measure on-line fluence spatial distributions. This monitor is composed of an ionization chamber, Hall Effect sensors and a scintillator. The ionization chamber set between the beam exit and the experiment measures the ion rate. The beam spot is localized thanks to the Hall Effect sensors set near the beam sweeping magnets. The scintillator is used with a photomultiplier tube to calibrate the ionization chamber and with an imaging device to calibrate the Hall Effect sensors. This monitor was developed to control the beam lines of a radiobiology dedicated experimentation room at GANIL. These experiments are held in the context of the research in hadron-therapy. As a matter of fact, this new cancer treatment technique is based on ion irradiations and therefore demands accurate knowledge about the relation between the dose deposit in biological samples and the induced effects. To be effective, these studies require an on-line control of the fluence. The monitor has been tested with different beams at GANIL. Fluence can be measured with a relative precision of {+-}4% for a dose rate ranging between 1 mGy/s and 2 Gy/s. Once permanently set on the beam lines dedicated to radiobiology at GANIL, this monitor will enable users to control the fluence spatial distribution for each irradiation. The scintillator and the imaging device are also used to control the position, the spot shape and the energy of different beams such as those used for hadron-therapy. (author)

  15. Realization of a scanning ion beam monitor

    International Nuclear Information System (INIS)

    Pautard, C.

    2008-07-01

    During this thesis, a scanning ion beam monitor has been developed in order to measure on-line fluence spatial distributions. This monitor is composed of an ionization chamber, Hall Effect sensors and a scintillator. The ionization chamber set between the beam exit and the experiment measures the ion rate. The beam spot is localized thanks to the Hall Effect sensors set near the beam sweeping magnets. The scintillator is used with a photomultiplier tube to calibrate the ionization chamber and with an imaging device to calibrate the Hall Effect sensors. This monitor was developed to control the beam lines of a radiobiology dedicated experimentation room at GANIL. These experiments are held in the context of the research in hadron-therapy. As a matter of fact, this new cancer treatment technique is based on ion irradiations and therefore demands accurate knowledge about the relation between the dose deposit in biological samples and the induced effects. To be effective, these studies require an on-line control of the fluence. The monitor has been tested with different beams at GANIL. Fluence can be measured with a relative precision of ±4% for a dose rate ranging between 1 mGy/s and 2 Gy/s. Once permanently set on the beam lines dedicated to radiobiology at GANIL, this monitor will enable users to control the fluence spatial distribution for each irradiation. The scintillator and the imaging device are also used to control the position, the spot shape and the energy of different beams such as those used for hadron-therapy. (author)

  16. Realization of a scanning ion beam monitor; Realisation d'un dispositif de controle et d'imagerie de faisceaux balayes d'ions

    Energy Technology Data Exchange (ETDEWEB)

    Pautard, C

    2008-07-15

    During this thesis, a scanning ion beam monitor has been developed in order to measure on-line fluence spatial distributions. This monitor is composed of an ionization chamber, Hall Effect sensors and a scintillator. The ionization chamber set between the beam exit and the experiment measures the ion rate. The beam spot is localized thanks to the Hall Effect sensors set near the beam sweeping magnets. The scintillator is used with a photomultiplier tube to calibrate the ionization chamber and with an imaging device to calibrate the Hall Effect sensors. This monitor was developed to control the beam lines of a radiobiology dedicated experimentation room at GANIL. These experiments are held in the context of the research in hadron-therapy. As a matter of fact, this new cancer treatment technique is based on ion irradiations and therefore demands accurate knowledge about the relation between the dose deposit in biological samples and the induced effects. To be effective, these studies require an on-line control of the fluence. The monitor has been tested with different beams at GANIL. Fluence can be measured with a relative precision of {+-}4% for a dose rate ranging between 1 mGy/s and 2 Gy/s. Once permanently set on the beam lines dedicated to radiobiology at GANIL, this monitor will enable users to control the fluence spatial distribution for each irradiation. The scintillator and the imaging device are also used to control the position, the spot shape and the energy of different beams such as those used for hadron-therapy. (author)

  17. BODIES OF KNOWLEDGE IN PROJECT MANAGEMENT AND PROJECT QUALITY MANAGEMENT

    OpenAIRE

    Tamara Gvozdenovic; Mirjana Miljanovic; Aleksandar Jegdic; Zeljko Crnogorcic

    2008-01-01

    One of the main trends is standardization of project management. Some of the most important bodies of knowledge in project management, which were created by professional associations for project management are given in this paper. The main of the project management, apart from minimization of time, resources and costs, is to finish the project in the required quality, i.e. it is very important during the whole process of project management to provide realizing the project without any deviatio...

  18. BODIES OF KNOWLEDGE IN PROJECT MANAGEMENT AND PROJECT QUALITY MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Tamara Gvozdenovic

    2008-03-01

    Full Text Available One of the main trends is standardization of project management. Some of the most important bodies of knowledge in project management, which were created by professional associations for project management are given in this paper. The main of the project management, apart from minimization of time, resources and costs, is to finish the project in the required quality, i.e. it is very important during the whole process of project management to provide realizing the project without any deviations from the previously set quality standards. Basic processes of project quality management are: quality planning, quality assurance and quality control.

  19. 40 CFR 258.41 - Project XL Bioreactor Landfill Projects.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Project XL Bioreactor Landfill... WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Design Criteria § 258.41 Project XL Bioreactor Landfill Projects. (a) Buncombe County, North Carolina Project XL Bioreactor Landfill Requirements...

  20. Virtual projects

    DEFF Research Database (Denmark)

    Svejvig, Per; Commisso, Trine Hald

    2012-01-01

    that the best practice knowledge has not permeated sufficiently to the practice. Furthermore, the appropriate application of information and communication technology (ICT) remains a big challenge, and finally project managers are not sufficiently trained in organizing and conducting virtual projects....... The overall implications for research and practice are to acknowledge virtual project management as very different to traditional project management and to address this difference.......Virtual projects are common with global competition, market development, and not least the financial crisis forcing organizations to reduce their costs drastically. Organizations therefore have to place high importance on ways to carry out virtual projects and consider appropriate practices...

  1. Signal and Noise Delineation for Prompt-Gamma Detection during Hadrontherapy

    International Nuclear Information System (INIS)

    Chin, M.-P.W.; Cerutti, F.; Ferrari, A.; Garcia-Ortega, P.; Sala, P.-R.

    2013-06-01

    Proton and carbon therapies of a human brain were simulated using FLUKA, with particular emphasis on treatment monitoring using the prompt gamma method where activities of the source proton/carbon in the patient's body are to be extracted from the positional profile of exit photons. Tissue heterogeneity ranging from hydrogen to zinc was represented in a VIP-Man anthropomorphic voxel phantom. Each photon exiting the head was scored with ancestry attributes such as the particle type of its parent, the originating collision type and site. These data, not accessible via physical detectors, were analysed to characterise the escaping photons, delineating signal from noise according to the gamma origin and scatter history. Combinations of energy, geometry, time and angle filters, aided by ray-tracing, were studied for the optimal compromise between a sufficiently featured exit profile and a statistically adequate count. These will be put in context with ongoing research in the field; our perspective for the prompt gamma method will be discussed in detail. (authors)

  2. Monte Carlo Latching Studies of Prompt-Gamma Detection During Hadrontherapy

    CERN Document Server

    Chin, M P W; Ferrari, A; Ortega, P G; Sala, P R

    2014-01-01

    Proton and carbon therapies of a human brain were simulated using FLUKA, with particular emphasis on treatment monitoring using the prompt gamma method where activities of the source proton/carbon in the patient's body are to be extracted from the positional profile of exit photons. Tissue heterogeneity ranging from hydrogen to zinc was represented in a VIP-Man anthropomorphic voxel phantom. Each photon exiting the head was scored with ancestry attributes such as the particle type of its parent, the originating collision type and site. These data, not accessible via physical detectors, were analysed to characterise the escaping photons, delineating signal from noise according to the gamma origin and scatter history. Combinations of energy, geometry, time and angle filters, aided by raytracing, were studied for the optimal compromise between a sufficiently featured exit profile and a statistically adequate count. These will be put in context with ongoing research in the field; our perspective for the prompt ga...

  3. Project development symposium

    Energy Technology Data Exchange (ETDEWEB)

    1983-01-01

    Papers were presented on the following: project evaluation; case studies - minerals; finance; applied finance; legal; manpower/industrial relations; and new technologies. Those papers on the coal industry were: mine planning for coal project development; the planning and management of a lignite exploration contract in Thailand; development of the West Cliff extended project; Ulan: a resource development; Saxonvale mine development a case study in project planning and project management; the role of marketing in the development of a new coal project; technical support for coal marketing; infrastructure development for the Ulan project; underground mine project developments; the bucketwheel excavator at Goonyella - a case study; tax aspects of mining development projects; cost of capital mining development projects; and trends in development project finance. 16 papers were abstracted separately.

  4. Project Temporalities

    DEFF Research Database (Denmark)

    Tryggestad, Kjell; Justesen, Lise; Mouritsen, Jan

    2013-01-01

    Purpose – The purpose of this paper is to explore how animals can become stakeholders in interaction with project management technologies and what happens with project temporalities when new and surprising stakeholders become part of a project and a recognized matter of concern to be taken...... into account. Design/methodology/approach – The paper is based on a qualitative case study of a project in the building industry. The authors use actor-network theory (ANT) to analyze the emergence of animal stakeholders, stakes and temporalities. Findings – The study shows how project temporalities can...... multiply in interaction with project management technologies and how conventional linear conceptions of project time may be contested with the emergence of new non-human stakeholders and temporalities. Research limitations/implications – The study draws on ANT to show how animals can become stakeholders...

  5. Understanding Applications of Project Planning and Scheduling in Construction Projects

    OpenAIRE

    AlNasseri, Hammad Abdullah

    2015-01-01

    Construction project life-cycle processes must be managed in a more effective and predictable way to meet project stakeholders’ needs. However, there is increasing concern about whether know-how effectively improves understanding of underlying theories of project management processes for construction organizations and their project managers. Project planning and scheduling are considered as key and challenging tools in controlling and monitoring project performance, but many worldwide constru...

  6. Project Management

    DEFF Research Database (Denmark)

    Project Management Theory Meets Practice contains the proceedings from the 1st Danish Project Management Research Conference (DAPMARC 2015), held in Copenhagen, Denmark, on May 21st, 2015.......Project Management Theory Meets Practice contains the proceedings from the 1st Danish Project Management Research Conference (DAPMARC 2015), held in Copenhagen, Denmark, on May 21st, 2015....

  7. Storytelling in Projects

    DEFF Research Database (Denmark)

    Munk-Madsen, Andreas; Andersen, Peter Bøgh

    2006-01-01

    project managers should not only be concerned with project plans, but also with project stories. In this paper we explore some basic principles for transforming project plans into appealing stories. We discuss what may happen to stories once they are released into public space. And we illustrate how......Plans and stories are two different ways of communicating about projects. Project plans are formalized descriptions, primarily supporting coordination. Project stories are accounts whose primary function is emotional appeal. Project stories influence the projects’ chances of success. Therefore...... the possibilities of telling favorable stories may have repercussions on the project planning....

  8. Experiences of project developers around CDM projects in South Africa

    International Nuclear Information System (INIS)

    Thurner, Thomas W.; Varughese, Arun

    2013-01-01

    Project developers in South Africa are puzzled with the long process of evaluating and registering their CDM projects. In addition to other obstacles, we find that South African big businesses are rather reluctant to engage in any new business activities such as CDM projects and municipalities often lack the necessary flexibility. This offers opportunities for small-scale project developers who spot the opportunities and find creative solutions to overcome these difficulties. - Highlights: • First paper analysing the experience of small project developers in South Africa. • Project developers in South Africa are puzzled with the long process. • South African big businesses are reluctant to engage in CDM projects. • Small-scale project developers spot opportunities and find creative solutions to overcome difficulties. • Also, we saw learning processes of South African administration in support of CDM projects

  9. MATCHING CONFIGURATIONS PROJECTS OF COOPERATIVE MILK COLLECTION PROJECT ENVIRONMENT

    Directory of Open Access Journals (Sweden)

    Анатолій Миколайович ТРИГУБА

    2017-03-01

    Full Text Available The condition analysis of dairy farming is done and the reasons for its degradation are revealed. The need of technologically integrated production systems projects, harvesting, and processing of milk are substantiated. A scientific methodology and the method of project design of milk provision cooperative coordination in the community of the project environment, which are based on systematic-evaluative approach and simulation are proposed. The criterion for the definition of rational parameters of objects configuration for milk provision cooperative projects in the community system is the maximum value of their product. The monetary functioning assessment of the configuration object of cooperative milk provision projects in the community is done. On the basis of the proposed method, we performed the coordination of project configuration of milk provision cooperative with the project environment of territory Zabolotsi community in Brody district of Lviv region.

  10. Project 2010 Bible

    CERN Document Server

    Marmel, Elaine

    2010-01-01

    A comprehensive reference on the latest version of the leading enterprise project management software: Microsoft Project 2010. Microsoft Project allows users to manage business activities effectively by sharing project information, performing modeling and scenario analyses, standardizizing reporting processes, and more. This soup-to-nuts reference covers both the professional and standard versions of the latest iteration of Microsoft Project, as well as Project Server, so that you can efficiently manage your business projects. Veteran author Elaine Marmel begins with an overview of project man

  11. Define Project

    DEFF Research Database (Denmark)

    Munk-Madsen, Andreas

    2005-01-01

    "Project" is a key concept in IS management. The word is frequently used in textbooks and standards. Yet we seldom find a precise definition of the concept. This paper discusses how to define the concept of a project. The proposed definition covers both heavily formalized projects and informally...... organized, agile projects. Based on the proposed definition popular existing definitions are discussed....

  12. Longitudinal burnout-collaboration patterns in Japanese medical care workers at special needs schools: a latent class growth analysis

    Directory of Open Access Journals (Sweden)

    Kanayama M

    2016-06-01

    Full Text Available Mieko Kanayama,1 Machiko Suzuki,1 Yoshikazu Yuma2 1Department of Human Health Sciences, Kyoto University Graduate School of Medicine, Kyoto, Japan; 2Department of Human Development Education, Graduate School of Education, Hyogo University of Teacher Education, Kato, Hyogo, Japan Abstract: The present study aimed to identify and characterize potential burnout types and the relationship between burnout and collaboration over time. Latent class growth analysis and the growth mixture model were used to identify and characterize heterogeneous patterns of longitudinal stability and change in burnout, and the relationship between burnout and collaboration. We collected longitudinal data at three time points based on Japanese academic terms. The 396 study participants included academic teachers, yogo teachers, and registered nurses in Japanese special needs schools. The best model included four types of both burnout and collaboration in latent class growth analysis with intercept, slope, and quadratic terms. The four types of burnout were as follows: low stable, moderate unstable, high unstable, and high decreasing. They were identified as involving inverse collaboration function. The results indicated that there could be dynamic burnout types, namely moderate unstable, high unstable, and high decreasing, when focusing on growth trajectories in latent class analyses. The finding that collaboration was dynamic for dynamic burnout types and stable for stable burnout types is of great interest. This was probably related to the inverse relationship between the two constructs. Keywords: burnout, collaboration, latent class growth analysis, interprofessional care, special needs schools

  13. Project Management Methods in Projects Co-financed by EU Funds

    OpenAIRE

    Kostalova, Jana; Tetrevova, Libena; Patak, Michal

    2017-01-01

    This paper deals with the management of projects co-financed by European Union funds (structural funds and the Cohesion Fund) in the Czech Republic (EU projects). The authors aimed to analyze and assess the scope of familiarity with basic project management methods and their application within the implementation of EU projects in the Czech Republic in the Programming Period 2007–2013. Based on a questionnaire survey of EU project organisers, the authors evaluate their attitudes to project man...

  14. The impact of project marketing on the projects finality

    Directory of Open Access Journals (Sweden)

    Oxana SAVCIUC

    2015-06-01

    Full Text Available In the last years we assist at the level of the Republic of Moldova and also at international level at a trend to offer financial support with a special focus on project-based funding. Once with the appearance and development of the project concept, other related concepts are being developed such as project management or newly, we can also speak about the projects marketing. Until recently, the product marketing was intensely discussed; concepts such as services marketing appeared afterwards, but also the specific marketing for various branches, such as agromarketing, political marketing, etc. Given that fact that the projects are a product / service itself, at the moment, more and more often projects marketing is discussed.

  15. Examination of the relationship between project management critical success factors and project success of oil and gas drilling projects

    Science.gov (United States)

    Alagba, Tonye J.

    Oil and gas drilling projects are the primary means by which oil companies recover large volumes of commercially available hydrocarbons from deep reservoirs. These types of projects are complex in nature, involving management of multiple stakeholder interfaces, multidisciplinary personnel, complex contractor relationships, and turbulent environmental and market conditions, necessitating the application of proven project management best practices and critical success factors (CSFs) to achieve success. Although there is some practitioner oriented literature on project management CSFs for drilling projects, none of these is based on empirical evidence, from research. In addition, the literature has reported alarming rates of oil and gas drilling project failure, which is attributable not to technical factors, but to failure of project management. The aim of this quantitative correlational study therefore, was to discover an empirically verified list of project management CSFs, which consistent application leads to successful implementation of oil and gas drilling projects. The study collected survey data online, from a random sample of 127 oil and gas drilling personnel who were members of LinkedIn's online community "Drilling Supervisors, Managers, and Engineers". The results of the study indicated that 10 project management factors are individually related to project success of oil and gas drilling projects. These 10 CSFs are namely; Project mission, Top management support, Project schedule/plan, Client consultation, Personnel, Technical tasks, Client acceptance, Monitoring and feedback, Communication, and Troubleshooting. In addition, the study found that the relationships between the 10 CSFs and drilling project success is unaffected by participant and project demographics---role of project personnel, and project location. The significance of these findings are both practical, and theoretical. Practically, application of an empirically verified CSFs list to oil

  16. A Correlational Study Assessing the Relationships among Information Technology Project Complexity, Project Complication, and Project Success

    Science.gov (United States)

    Williamson, David J.

    2011-01-01

    The specific problem addressed in this study was the low success rate of information technology (IT) projects in the U.S. Due to the abstract nature and inherent complexity of software development, IT projects are among the most complex projects encountered. Most existing schools of project management theory are based on the rational systems…

  17. A Framework for Project Governance in Major Public IT projects

    DEFF Research Database (Denmark)

    Harboe, Peter Georg; Riis, Eva

    2016-01-01

    such a framework. It was developed from the literature on major and mega-projects, both public and private, that concern infrastructure, engineering and IT. The proposed framework for project governance comprises six major elements: governance structure, management approach, stakeholders, value, systems......The rising number of major public IT projects is mirrored by a growing research interest in the management of such projects. Both can benefit from a more complete understanding of project governance that should lead to a practical framework for project governance. The present paper proposes...... integration and complexity. Empirical research has identified a number of characteristics for these project governance elements. In the second part of the paper the framework was tested in a case study of the Danish smart card Rejsekort project. The framework was found to be robust, and that in this case...

  18. A Framework for Project Governance in Major Public IT projects

    DEFF Research Database (Denmark)

    Riis, Eva; Harboe, Peter Georg

    2016-01-01

    integration and complexity. Empirical research has identified a number of characteristics for these project governance elements. In the second part of the paper the framework was tested in a case study of the Danish smart card Rejsekort project. The framework was found to be robust, and that in this case......The rising number of major public IT projects is mirrored by a growing research interest in the management of such projects. Both can benefit from a more complete understanding of project governance that should lead to a practical framework for project governance. The present paper proposes...... such a framework. It was developed from the literature on major and mega-projects, both public and private, that concern infrastructure, engineering and IT. The proposed framework for project governance comprises six major elements: governance structure, management approach, stakeholders, value, systems...

  19. 地震時の人体被災度計測手法の開発 : 胸部圧迫実験用ダミーの作製

    OpenAIRE

    宮野, 道雄; 生田, 英輔; 長嶋, 文雄; 田中, 裕; 梶原, 浩一; 奥野, 倫子; Michio, MIYANO; Eisuke, IKUTA; Fumio, NAGASHIMA; Hiroshi, TANAKA; Kouichi, KAJIWARA; Michiko, OKUNO; 大阪市立大学大学院生活科学研究科; 大阪市立大学大学院生活科学研究科; 首都大学東京大学院都市環境科学研究科

    2008-01-01

    The immediate victims of the 1995 Hyogo-ken Nanbu Earthquake included 5,502 dead and 41,527 wounded. The death rate among victims in collapsed buildings was purported to be as high as 90%. However, we have no way to examine how the victim got dead or wounded, except for autopsy and interview with the bereaved. We need knowledge in detail about what part of building or furniture caused casualty and how it was occurred. Therfore, we aimed to make a dummy to measure human body damage due to coll...

  20. Trevino Project: a fast-track approach for a small construction project

    International Nuclear Information System (INIS)

    Schick, C.J.; Lynn, N.S.

    1982-01-01

    The approach to a construction project can vary according to the size, location, and degree of difficulty associated with the project. This paper deals with one approach that can be taken to a small construction project, the fast-track approach. A small construction project can be defined as a project having less than $20 million capital cost or a project with a low degree of difficulty. This approach is very applicable to in-situ leaching uranium projects, small precious metal operations, etc. The approach to the small project is that of fast-tracking the project in order to minimize the time over which capital expenditure occurs and also to reduce the indirect costs of field expense, construction supplies, construction equipment, etc. In order to fast-track a project it is necessary to do a very precise job on the preliminary phases of the project such as preliminary engineering, plant site location, environmental permits, etc. 2 figures, 2 tables

  1. PROJECT - RESOURCE MANAGEMENT OF INNOVATIONS IN EDUCATION: ANTHROPOLOGICAL PROJECTION

    Directory of Open Access Journals (Sweden)

    Galina Aleksandrovna Ignat’eva

    2015-08-01

    Full Text Available The purpose of the research was to denote a way to solve the problem of education mana-gement ΄s insufficient efficiency considered from the point of view of education opportunities to influence on the formation of mechanisms for sustainable development of society as a whole and its educational component. The concept «project-resource management of innovation in education» regarded on the basis of the anthropological project-transforming paradigm. Conceptually-categorical context presented by conceptual cluster composed of coordinated concepts «project», «resource», «educational reality», «organizational-resource potential», «project commonality». In the theoretical part of the study on the basis of analysis of the normative and exploratory approaches to educational innovations organization and management it was established the search approach ΄s leading role in the methodological substantiation of project-resource management. The study have indicated that in the presence of variable models of innovation management in education, corresponding to various predictive models of continuing education post-industrial society, project-resource management is an universal mechanism for the transition from separate innovation΄s precedents to the an authentic reality of innovative education. In the technological part of the study the main concern was to submit the project-resource management by the management goal’s system, each of which includes the specific management actions, projected results and the organizational forms. The project-resource management ΄s professional – activity context of the study showed evolution of managerial positions: an effective performer – an effective leader – strategist, implemented during the transition from directly directive management to the project management and further to the project-resource management. Based on the findings identified the key factors of initiatively-problem projects

  2. PACTEL OECD project planning (PACO). PACTEL OECD project planning

    Energy Technology Data Exchange (ETDEWEB)

    Kouhia, V.; Purhonen, H. [Lappeenranta University of Technology (Finland)

    2004-07-01

    OECD launched the SETH project to investigate issues relevant for accident prevention and management and to ensure the existence of integral thermal hydraulic test facilities. The facilities included in the SETH project are PKL from Germany and PANDA from Switzerland. At the early stages of the SETH project an idea was raised to exploit the PACTEL facility in a similar OECD project. Without any external funding the analytical work in the required extent would not be possible within Lappeenranta University of Technology, the party responsible of operating PACTEL. This fact directed the PACO project proposal to be conducted for the SAFIR programme. The aim of the PACO project is to prepare a project proposal to OECD of a PACTEL related project. To attain this objective some preliminary analyses have to be performed to ensure the relevancy of the proposed topic. The low power situation, i.e. midloop state was chosen to be the topic in the PACO studies and project planning basis. The plan is to use PACTEL to examine vertical steam generator behaviour during the midloop operation and the following loss of residual heat removal system transient. Such a possibility is acknowledged with special alterations to PACTEL. The APROS code version 5.04.07 was selected as a tool for the preanalyses. The virtual simulation of the chosen experimental situation would give a preconception on the phenomena to be expected and the progression of the transient. Originally the PACO project was planned to continue only for a few months, ending up with the project proposal to OECD during the summer time 2004. During the pre-calculation process it became obvious that the time expected was not enough to establish good pre-calculation results. The reasons for this relates to time used to learn and adapt the use of the chosen code, improvements and corrections in modelling as well as the code ability to manage the special conditions defined for the project topic. Another aspect on completing a

  3. Project manager attributes influencing project success in the South ...

    African Journals Online (AJOL)

    success criteria for building projects in Ghana and concluded that the “current and ... qualifications, profession, leadership style and project team ... and expectations of project management competence between ... 1.d. Sense of teamwork ...

  4. Microsoft project

    OpenAIRE

    Markić, Lucija; Mandušić, Dubravka; Grbavac, Vitomir

    2005-01-01

    Microsoft Project je alat čije su prednosti u svakodnevnom radu nezamjenjive. Pomoću Microsoft Projecta omogućeno je upravljanje resursima, stvaranje izvještaja o projektima u vremenu, te analize različitih scenarija. Pojavljuje u tri verzije: Microsoft Project Professional, Microsoft Project Server i Microsoft Project Server Client Access Licenses. Upravo je trend da suvremeni poslovni ljudi zadatke povjeravaju Microsoft Projectu jer on znatno povećava produktivnost rada. Te prednos...

  5. Project stakeholder management

    CERN Document Server

    Eskerod, Pernille

    2013-01-01

    Carrying out a project as planned is not a guarantee for success. Projects may fail because project management does not take the requirements, wishes and concerns of stakeholders sufficiently into account. Projects can only be successful though contributions from stakeholders. And in the end, it is the stakeholders that evaluate whether they find that the project is a success. To manage stakeholders effectively, you need to know your stakeholders, their behaviours and attitudes towards the project. In Project Stakeholder Management, the authors give guidance on how to adopt an analytical and s

  6. Project Half Double

    DEFF Research Database (Denmark)

    Svejvig, Per; Gerstrøm, Anna; Frederiksen, Signe Hedeboe

    The Half Double mission: Project Half Double has a clear mission. We want to succeed in finding a project methodology that can increase the success rate of our projects while increasing the development speed of new products and services. We are convinced that by doing so we can strengthen...... the competitiveness of Denmark and play an important role in the battle for jobs and future welfare. The overall goal is to deliver “Projects in half the time with double the impact” where projects in half the time should be understood as half the time to impact (benefit realization, effect is achieved......) and not as half the time for project execution. The Half Double project journey: It all began in May 2013 when we asked ourselves: How do we create a new and radical project paradigm that can create successful projects? Today we are a movement of hundreds of passionate project people, and it grows larger...

  7. Web Project Management

    OpenAIRE

    Suralkar, Sunita; Joshi, Nilambari; Meshram, B B

    2013-01-01

    This paper describes about the need for Web project management, fundamentals of project management for web projects: what it is, why projects go wrong, and what's different about web projects. We also discuss Cost Estimation Techniques based on Size Metrics. Though Web project development is similar to traditional software development applications, the special characteristics of Web Application development requires adaption of many software engineering approaches or even development of comple...

  8. Project Documentation as a Risk for Public Projects

    Directory of Open Access Journals (Sweden)

    Vladěna Štěpánková

    2015-08-01

    Full Text Available Purpose of the article: The paper presents the different methodologies used for creating documentation and focuses on public projects and their requirements for this documentation. Since documentation is also incorporated in the overall planning of the project and its duration is estimated using expert qualified estimate, can any change in this documentation lead to project delays, or increase its cost as a result of consuming administration, and therefore the documentation is seen as a risk, which may threaten the project as a public contract by which a company trying to achieve and obtains it, and generally any project. Methodology/methods: There are used methods of obtaining information in this paper. These are mainly structured interviews in combination with a brainstorming, furthermore also been used questionnaire for companies dealing with public procurement. As a data processing program was used MS Excel and basic statistical methods based on regression analysis. Scientific aim: The article deals with the construction market in the Czech Republic and examines the impact of changes in project documentation of public projects on their turnover. Findings: In this paper we summarize the advantages and disadvantages of having project documentation. In the case of public contracts and changes in legislation it is necessary to focus on creating documentation in advance, follow the new requirements and try to reach them in the shortest possible time. Conclusions: The paper concludes with recommendations on how to proceed, if these changes and how to reduce costs, which may cause the risk of documentation.

  9. Watchdog Project

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Rhett [Schweitzer Engineering Laboratories, Inc., Pullman, WA (United States); Campbell, Jack [CenterPoint Energy Houston Electric, TX (United States); Hadley, Mark [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-12-30

    The Watchdog Project completed 100% of the project Statement of Project Objective (SOPO). The Watchdog project was a very aggressive project looking to accomplish commercialization of technology that had never been commercialized, as a result it took six years to complete not the original three that were planned. No additional federal funds were requested from the original proposal and SEL contributed the additional cost share required to complete the project. The result of the Watchdog Project is the world’s first industrial rated Software Defined Network (SDN) switch commercially available. This technology achieved the SOPOO and DOE Roadmap goals to have strong network access control, improve reliability and network performance, and give the asset owner the ability to minimize attack surface before and during an attack. The Watchdog project is an alliance between CenterPoint Energy Houston Electric, Pacific Northwest National Laboratories (PNNL), and Schweitzer Engineering Laboratories, Inc. (SEL). SEL is the world’s leader in microprocessor-based electronic equipment for protecting electric power systems. PNNL performs basic and applied research to deliver energy, environmental, and national security for our nation. CenterPoint Energy is the third largest publicly traded natural gas delivery company in the U.S and third largest combined electricity and natural gas delivery company. The Watchdog Project efforts were combined with the SDN Project efforts to produce the entire SDN system solution for the critical infrastructure. The Watchdog project addresses Topic Area of Interest 5: Secure Communications, for the DEFOA- 0000359 by protecting the control system local area network itself and the communications coming from and going to the electronic devices on the local network. Local area networks usually are not routed and have little or no filtering capabilities. Combine this with the fact control system protocols are designed with inherent trust the control

  10. Influence of organizational and project cultures on project success

    Directory of Open Access Journals (Sweden)

    Berdykulova G. M.

    2017-10-01

    Full Text Available the article is dedicated to studying the influence of organizational and project cultures on effective project management of the company by knowledge systematization and the comparative analysis of world companies’ practice that allowed to reveal the main factors and criteria of projects success and negative influence of organizational culture on the project; key aspects of corporate culture and cultural integration under the conditions of globalization.

  11. Pac-Rim LNG project : final project report specifications

    International Nuclear Information System (INIS)

    1996-01-01

    PAC-RIM LNG Inc. has submitted a proposal to the British Columbia Environmental Assessment Office, to develop a liquefied natural gas project which would purchase pipeline quality natural gas from sources in northeast British Columbia and Alberta and transport it via a dedicated pipeline system to a LNG processing plant on tidewater on the Pacific coast. The project would include storage and processing facilities and a marine loading terminal. This document sets out the final project report specifications prepared by the Project Committee on the basis of input received from the public, First Nations and federal, provincial and local governments

  12. Does Lean & Agile Project Management Help Coping with Project Complexity?

    NARCIS (Netherlands)

    Jalali Sohi, A.; Hertogh, M.J.C.M.; Bosch-Rekveldt, M.G.C.; Blom, R.; Serpell, A.; Ferrada, X.

    2016-01-01

    Still, projects in the construction sector are delivered with time delays and cost overruns. One of the reasons for poor performance was assigned to project complexity. A combination of lean construction and agile project management are hypothesized as a possible solution to cope with project

  13. Novel applications of particle accelerators to radiotherapy

    International Nuclear Information System (INIS)

    Kreiner, A.J.; Burlon, A.A.; Universidad Nacional de San Martin, Villa Ballester

    2002-01-01

    Charged hadrons (protons and heavier ions) have very definite advantages over photons as far as radiotherapy applications are concerned. They allow for much better spatial dose localization due to their charge, relatively high mass and nature of the energy deposition process. In the frame of an attempt to promote the introduction of hadrontherapy in Argentina an external beam facility has been installed at our tandem accelerator TANDAR. The advantages of heavy ions can only be fully exploited for tumors of well defined localization. In certain types of malignancies, however, the region infiltrated by tumor cells is diffuse, with no sharp boundaries and with microscopic ramifications. In such cases (particularly in certain brain cancers) a more sophisticated scheme has been suggested called boron neutron capture therapy (BNCT). In this work, the use of the Tandar accelerator to produce neutrons for feasibility studies for BNCT through low-energy proton beams on a thick LiF target is being briefly described. Studies on the 13 C(d,n) reaction and a comparison with other neutron-producing reactions are also mentioned. Simulation work to optimize an accelerator-based neutron production target is discussed. A project is being prepared to develop a small proton accelerator in Argentina. Technical specifications of this machine are briefly discussed. (author)

  14. Modern project-management

    CERN Multimedia

    CERN. Geneva

    2003-01-01

    This lecture will focus on the following issues: - The current state of the art in Project Management, especially the integration of Project Management with general management activities, and the integrated view of resources allocation. - Overview of the project life cycle, the phases and the deliverables - Necessity and limits of planning in a research environment - Organizational aspects of the projects the roles of the stakeholders - How to get the resources when they are needed - Risk Management in Projects - Earned value - How to keep a project on track (schedule and budget) - Management of the suppliers - Closing of the project

  15. Project ethics

    CERN Document Server

    Jonasson, Haukur Ingi

    2013-01-01

    How relevant is ethics to project management? The book - which aims to demystify the field of ethics for project managers and managers in general - takes both a critical and a practical look at project management in terms of success criteria, and ethical opportunities and risks. The goal is to help the reader to use ethical theory to further identify opportunities and risks within their projects and thereby to advance more directly along the path of mature and sustainable managerial practice.

  16. Integrated project support environments the ASPECT project

    CERN Document Server

    Brown, Alan W

    1991-01-01

    A major part of software engineering developments involve the use of computing tools which facilitate the management, maintenance, security, and building of long-scale software engineer projects. Consequently, there have been a proliferation of CASE tools and IPSES. This book looks at IPSES in general and the ASPECT project in particular, providing design and implementation details, as well as locating ASPECT in IPSE developments.Survey of integrated project support environments for more efficient software engineering**Description of a large scale IPSE--ASPECT**Evaluation of formal methods in

  17. ASEAN projects reviewed.

    Science.gov (United States)

    1980-01-01

    The ASEAN Population Expert Group met in Manila and was followed by a meeting of the ASEAN heads of population programs, during the period November 5-10, 1979. Heads of population programs from Indonesia, Malaysia, Singapore, Thailand, and the Philippines attended. The meetings were held to review progress-to-date on phase 1 projects and to consider the development of an expanded population program. 5 projects funded by UNFPA are reviewed in tabular form with the project, the sponsoring country, date of implementation, data analysis, and date of completion. Suggestions were made for improving and extending these projects and it was also suggested that all projects being developed and proposed should include a section on use of research. 7 new projects were proposed as phase 2 projects. The 1st, sponsored by Malaysia, deals with women in development; project 2, lead by Thailand, will investigate population movement and its effect on development; project 3, led by the Philippines, will develop and strengthen national population information systems and networks in ASEAN countries; project 4, led by Indonesia, is directed towards institutional development and exchanges of personnel; project 5, led by the Philippines, will examine population and development dynamics and the man/resources balance; project 6, led by Thailand, will develop ASEAN social indicators; and project 7, led by Indonesia and Malaysia, will make a comprehensive analysis of existing medical/health care and family planning systems. It was recommended that an executive director of the proposed ASEAN population coordination unit should be appointed to expedite the recommendations of the meeting related to preparation and submission of phase 2 project proposals.

  18. Project Half Double

    DEFF Research Database (Denmark)

    Svejvig, Per; Ehlers, Michael; Adland, Karoline Thorp

    activities carried out within the framework of the projects. The formal part of Project Half Double was initiated in June 2015. We started out by developing, refining and testing the Half Double methodology on seven pilot projects in the first phase of the project, which will end June 2016. The current......Project Half Double has a clear mission to succeed in finding a project methodology that can increase the success rate of our projects while increasing the speed at which we generate new ideas and develop new products and services. Chaos and complexity should be seen as a basic condition...... and as an opportunity rather than a threat and a risk. We are convinced that by doing so, we can strengthen Denmark’s competitiveness and play an important role in the battle for jobs and future welfare. The overall goal is to deliver “projects in half the time with double the impact”, where projects in half the time...

  19. Integrated project risk management of nuclear power projects

    International Nuclear Information System (INIS)

    Wang Xiaohui; Xu Yuanhui

    2001-01-01

    The concept and the features of risks in nuclear power projects are introduced, and in terms of nuclear power projects' own features, the Nuclear Power Project Integrated Risk Management Model is presented. The identification, estimation, evaluation, response plan development, control of risks and the theoretical basis of risk management are discussed. The model has feedback and control functions in order to control and manage the risks dynamically

  20. REPNET: project scheduling and workflow optimization for Construction Projects

    Directory of Open Access Journals (Sweden)

    Marco Alvise Bragadin

    2013-10-01

    Full Text Available Project planning and control are core processes for construction management. In practice project planning is achieved by network - based techniques like Precedence Diagramming Method (PDM.Indeed many researchers and practitioners claims that networking techniques as such do not provide a suitable model for construction projects. Construction process modeling should incorporate for specific features of resource flows through project activities. So an improved resource scheduling method for construction is developed, called REPNET, based on a precedence network plotted on a resource–space chart and presented with a flow-line chart. The heuristics of REPNET are used to carry out resource timing while optimizing processes flows and resource usage. The method has been tested on a sample project.

  1. Capital projects coordination

    Directory of Open Access Journals (Sweden)

    Zubović Jovan

    2004-01-01

    Full Text Available This paper looks at the difficulties of managing modem capital projects and endeavors to reduce the complexities to simpler and more understandable terms. It examines the project environment, defines project management and discusses points of difference from traditional management. In the second part of the paper are presented fundamentals for project success for different types of projects.

  2. Competency model for the project managers of technical projects

    Science.gov (United States)

    Duncan, William R.

    1992-05-01

    Traditional job description techniques were developed to support compensation decisions for hourly wage earners in a manufacturing environment. Their resultant focus on activities performed on the job works well in this environment where the ability to perform the activity adequately is objectively verifiable by testing and observation. Although many organizations have adapted these techniques for salaried employees and service environments, the focus on activities performed has never been satisfactory. For example, stating that a project manager `prepares regular project status reports' tells us little about what to look for in a potential project manager or how to determine if a practicing project manager is ready for additional responsibilities. The concept of a `competency model' has been developed within the last decade to address this shortcoming. Competency models focus on what skills are needed to perform the tasks defined by the job description. For example, a project manager must be able to communicate well both orally and in writing in order to `prepare regular project status reports.'

  3. PROJECT SCOPE MANAGEMENT PROCESS

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2018-01-01

    Full Text Available The purpose of the article is to define the essence of project scope management process, its components, as well as to develop an algorithm of project scope management in terms of pharmaceutical production. Methodology. To carry out the study, available information sources on standards of project management in whole and elements of project scope management in particular are analysed. Methods of system and structural analysis, logical generalization are used to study the totality of subprocesses of project scope management, input and output documents, and to provide each of them. Methods of network planning are used to construct a precedence diagram of project scope management process. Results of the research showed that components of the project scope management are managing the scope of the project product and managing the content of project work. It is the second component is investigated in the presented work as a subject of research. Accordingly, it is defined that project scope management process is to substantiate and bring to the realization the necessary amount of work that ensures the successful implementation of the project (achievement of its goal and objectives of individual project participants. It is also determined that the process of managing the project scope takes into account the planning, definition of the project scope, creation of the structure of project work, confirmation of the scope and management of the project scope. Participants of these subprocesses are: customer, investor, and other project participants – external organizations (contractors of the project; project review committee; project manager and project team. It is revealed that the key element of planning the project scope is the formation of the structure of design work, the justification of the number of works, and the sequence of their implementation. It is recommended to use the following sequence of stages for creating the structure of project work

  4. Project risk management: A review of an institutional project life cycle

    Directory of Open Access Journals (Sweden)

    Wanjiru Gachie

    2017-11-01

    Full Text Available This article is a desktop analysis of project risk management involving a project management institutional restructuring. The pragmatic nature of this research allows for the literature review and the document analysis to be integrated and presented as both a descriptive and analytical research. The analysis demonstrates that the project committee did not proactively manage project risk. The restructuring was a change management project, entailing the implementation of many organisational changes, such as restructuring, lay-off of some part of the administrative workforce, adoption of new technology, provision of new approaches to well-established procedures, and implementation of new performance initiative, the process which should have been managed with an effective integrated risk strategy and plan. Analysis of the restructuring project risk management exhibits little evidence of a systematic (computer based or manual record that should have provided policies, procedures, and structures for managing risk. The article concludes that the restructuring risk process was inadequate and it could not have ensured a successful project. An analysis of the restructuring project risk monitoring and control exhibits a reactive rather than proactive application of risk management procedures. The analysis further indicates that the committee failed to make use of the various project risk management processes, standards, and guidelines. Based on the conclusions, the article recommends that project risk planning, strategy, control, and monitoring should be put in place for future institutional projects. The project management team should also put in place procedures for primary stakeholders engagements, identify and address their nature of interest and power in future risk management projects

  5. How Does a Project Manager's Level of Development Influence Conceptualizations of Project Management and the Project Development Environment?

    Science.gov (United States)

    Lynch, Margaret M.

    2013-01-01

    This study explores the meaning project managers (PMs) make of their project environment, how they lead their teams and have incorporate complexity into their project management approach. The exploration of the PM's developmental level and meaning making offers a different angle on the project management and leadership literature. The study…

  6. Overlapping Boundaries of the Project Time Management and Project Risk Management

    Directory of Open Access Journals (Sweden)

    Marius PODEAN

    2010-01-01

    Full Text Available Based on utility function, milestones during project and/or the end of projects or programme may be categorized in what are called soft-deadline and hard-deadline. In contrast with the soft-end projects, the hard-end projects posses a decrease of utility function with a vertical asymptote character around the deadline for project completion. In extreme situations, the utility function itself may fall under zero (projects may generate losses to both constructor and customer. Existing risk analysis methodologies observe risks from monetary terms. The typical risks are correlated with an increase in final project costs. In order to estimate harddeadline milestones and/or end of projects or programme is critical to employ the time dimension rather than the typical cost-based risk analysis. Here, we comprehensively describe a structured methodology that focuses on minimizing and mitigating project specific delay risks. The method may supplement existing cost-based risk analysis in projects. We aim to elegantly combine moderation techniques to reveal the intrinsic risk of the projects. In addition to the technical risks, the moderation techniques are able to bring evidence of risks as the team efficacy, diverse un-correlations or miss-understanding about the roles of the team members in the team – most of the project soft risk. Described methodology encourages the common understanding of risks for participants, crystallizing the essence of what can go wrong in complex situations and where the opportunities can be unlocked.

  7. The USE Project

    DEFF Research Database (Denmark)

    Frøkjær, E.; Hornbæk, K.; Høegh, Rune Thaarup

    2006-01-01

    This paper provides experience from activities in the USE project. The USE project is a research project that aims at bridging the gap between usability evaluation and user interface design. It is conducted from 2005 to 2008 in collaboration between researchers from Aalborg University and Copenha......This paper provides experience from activities in the USE project. The USE project is a research project that aims at bridging the gap between usability evaluation and user interface design. It is conducted from 2005 to 2008 in collaboration between researchers from Aalborg University...... and Copenhagen University, and developers and managers working in software development organizations....

  8. Conjoint utility analysis of technical maturity and project progress of construction project

    Directory of Open Access Journals (Sweden)

    Ma Wei

    2016-01-01

    Full Text Available In this paper, taking construction project as the research object, the relationship between the project maturity index calculated by the construction project technical risks with different fine degree and the project progress index is studied, and the equilibrium relationship between the Party A’s utility curve and the Party B’s cost curve of using project maturity index and project progress index as the research variables is analyzed. The results show that, when the construction project technical risk division is more precise, the conjoint utility of the project's technical maturity index and the project progress is higher, and the project’s Party A and Party B two sides are closer to the optimal equilibrium. This shows that the construction project technical risk must be finely divided, and managed and controlled respectively, which will help to improve the conjoint utility of the project Party A and Party B two sides.

  9. Final Project Report Project 10749-4.2.2.1 2007-2009

    Energy Technology Data Exchange (ETDEWEB)

    Zacher, Alan H.; Holladay, Johnathan E.; Frye, J. G.; Brown, Heather M.; Santosa, Daniel M.; Oberg, Aaron A.

    2009-05-11

    This is the final report for the DOE Project 10749-4.2.2.1 for the FY2007 - FY2009 period. This report is non-proprietary, and will be submitted to DOE as a final project report. The report covers activities under the DOE Project inside CRADA 269 (Project 53231) as well as project activites outside of that CRADA (Project 56662). This is the final report that is summarized from the non-proprietary quarterlies submitted to DOE over the past 2.5 years, which in turn are summaries from the proprietary technical reporting to UOP.

  10. Heavy Metals Contaminated Soil Project, Resource Recovery Project, and Dynamic Underground Stripping Project

    International Nuclear Information System (INIS)

    1994-02-01

    The Department of Energy (DOE) established the Office of Technology Development (EM-50) (OTD) as an element of Environmental Restoration and Waste Management (EM) in November, 1989. OTD has begun to search out, develop, test and demonstrate technologies that can now or in the future be applied to the enormous remediation problem now facing the DOE and the United States public in general. Technology demonstration projects have been designed to attack a separate problem as defined by DOE. The Heavy Metals Contaminated Soil Project was conceived to test and demonstrate off-the-shelf technologies (dominantly from the mining industry) that can be brought to bear on the problem of radionuclide and heavy metal contamination in soils and sediments. The Resource Recovery Project is tasked with identifying, developing, testing, and evaluating new and innovative technologies for the remediation of metal contaminated surface and groundwater. An innovative twist on this project is the stated goal of recovering the metals, formerly disposed of as a waste, for reuse and resale, thereby transforming them into a usable resource. Finally, the Dynamic Underground Stripping Project was developed to demonstrate and remediate underground spills of hydrocarbons from formations that are (1) too deep for excavation, and/or (2) require in-situ remediation efforts of long duration. This project has already been shown effective in reducing the time for remediation by conventional methods from an estimated 200 years at the Lawrence Livermore National Laboratory (LLNL) to less than one year. The savings in time and dollars from this technology alone can be immeasurable

  11. Successful project management

    CERN Document Server

    Young, Trevor L

    2016-01-01

    Successful Project Management, 5th edition, is an essential guide for anyone who wants to improve the success rate of their projects. It will help managers to maintain a balance between the demands of the customer, the project, the team and the organization. Covering the more technical aspects of a project from start to completion it contains practised and tested techniques, covering project conception and start-up, how to manage stake holders, effective risk management, project planning and launch and execution. Also including a brand new glossary of key terms, it provides help with evaluating your project as well as practical checklists and templates to ensure success for any ambitious project manager. With over one million copies sold, the hugely popular Creating Success series covers a wide variety of topic, with the latest editions including new chapters such as Tough Conversations and Treating People Right. This indispensable business skills collection is suited to a variety of roles, from someone look...

  12. Reflexive project management in high-abition projects

    NARCIS (Netherlands)

    Loeber, Anne; Vermeulen, T.

    2016-01-01

    Purpose
    The Aristotelian notion of phronèsis inspired innovative work in the realm of project management as well as in literature on sustainability and societal transformations. We argue that both literatures may benefit from a dialogue between the two, especially in view of outlining project

  13. Project brief of pre-contract in project management

    International Nuclear Information System (INIS)

    Mohd Jamil Hashim; Mohd Azmi Sidid Omar; Abdul Rahman Norazumin; Zakaria Dris; Abdul Murad Abu Bakar; Alwi Othman

    2010-01-01

    Project brief is a comprehensive document used in translating the user needs and requirement for the project implementation. This document is important for the designer as a main guidance towards establishing project details. Research shown that problem usually arises from not well-defined scope and needs by the user. With lack of information the designer tend to assume and interprets wrong translation. Other issues arise from project management are time, cost, budgetary, lack of communication and establishing quality management. Some ideas of improvement were gain by doing cross reference with JKR quality system management, workshop and brainstorming. It shows that an improvement of data collection system has to be integrating with some basic format details, drawings and declaration forms to be established. (author)

  14. IT Project Selection

    DEFF Research Database (Denmark)

    Pedersen, Keld

    2016-01-01

    for initiation. Most of the research on project selection is normative, suggesting new methods, but available empirical studies indicate that many methods are seldom used in practice. This paper addresses the issue by providing increased understanding of IT project selection practice, thereby facilitating...... the development of methods that better fit current practice. The study is based on naturalistic decision-making theory and interviews with experienced project portfolio managers who, when selecting projects, primarily rely on political skills, experience and personal networks rather than on formal IT project......-selection methods, and these findings point to new areas for developing new methodological support for IT project selection....

  15. The role of project planning in project management

    OpenAIRE

    Klitsenko, A. I.; Клиценко, А. И.

    2013-01-01

    This article describes the importance of the process of project planning. The author gives irrefutable arguments concerning crucial role of project planning. This article presents the definition, objects and the main goal of project planning. The purpose of this article is to review such objects of project planning as project scope, risk and human resources. Данная статья описывает важность процесса проектного планирования. Автор дает неопровержимые доводы, касающиеся решающей роли проектн...

  16. ASP project. Dissolved oxygen issues in ASP project

    Directory of Open Access Journals (Sweden)

    M.Y. Bondar

    2018-03-01

    Full Text Available The article presents the latest results of studies about the effect of dissolved oxygen on the efficiency of the ASP flooding project implemented by Salym Petroleum Development N.V.. Pilot project on experimental injection of anionic surfactant solutions, soda and polymer into the reservoir for enhanced oil recovery (ASP project has been implemented since 2016. The stability of one of the components of the ASP polymer is strongly dependent on the presence of iron, stiffness cations and dissolved oxygen in the water. Since the polymer is used for injection at two stages of the project, which are essential and the longest, at the design stage of ASP project a whole complex of polymer protection had been established against negative factors, in particular from the influence of oxygen, which causes not only oxygen corrosion but also irreversible destruction polymer chains. In the paper, studies on the stability of polymer solutions are described, an analysis of viscosity loss with time in the presence of iron and oxygen for polymer solutions is carried out. The choice of chemical deoxygenation method for the control of dissolved oxygen is substantiated. The program of laboratory studies of the ASP project and the analytical instruments used are described. The technological scheme of the ASP process is presented, and recommendations for the implementation of the technology are given.

  17. Projective geometry and projective metrics

    CERN Document Server

    Busemann, Herbert

    2005-01-01

    The basic results and methods of projective and non-Euclidean geometry are indispensable for the geometer, and this book--different in content, methods, and point of view from traditional texts--attempts to emphasize that fact. Results of special theorems are discussed in detail only when they are needed to develop a feeling for the subject or when they illustrate a general method. On the other hand, an unusual amount of space is devoted to the discussion of the fundamental concepts of distance, motion, area, and perpendicularity.Topics include the projective plane, polarities and conic sectio

  18. Projective measure without projective Baire

    DEFF Research Database (Denmark)

    Schrittesser, David; Friedman, Sy David

    We prove that it is consistent (relative to a Mahlo cardinal) that all projective sets of reals are Lebesgue measurable, but there is a ∆13 set without the Baire property. The complexity of the set which provides a counterexample to the Baire property is optimal.......We prove that it is consistent (relative to a Mahlo cardinal) that all projective sets of reals are Lebesgue measurable, but there is a ∆13 set without the Baire property. The complexity of the set which provides a counterexample to the Baire property is optimal....

  19. Project Planning and Implementation: Lessons Learned From the AQBMP Project

    National Research Council Canada - National Science Library

    1997-01-01

    ...). This NSRP report is funded as an addendum to the Air Quality Best Management Practices (AQBMP) project (N1 -944). The AQBMP project was completed using an intensive project planning process using a variety of quality management tools...

  20. One project's waste is another project's resource

    International Nuclear Information System (INIS)

    Short, J.

    1997-01-01

    The author describes the efforts being made toward pollution prevention within the DOE complex, as a way to reduce overall project costs, in addition to decreasing the amount of waste to be handled. Pollution prevention is a concept which is trying to be ingrained into project planning. Part of the program involves the concept that ultimately the responsibility for waste comes back to the generator. Parts of the program involve efforts to reuse materials and equipment on new projects, to recycle wastes to generate offsetting revenue, and to increase awareness, accountability and incentives so as to stimulate action on this plan. Summaries of examples are presented in tables

  1. Ambidextrous Leadership and Sustainability-Based Project Performance: The Role of Project Culture

    Directory of Open Access Journals (Sweden)

    Junwei Zheng

    2017-12-01

    Full Text Available Most studies in the project management field emphasized the effects of leaders or managers, but these effects have rarely been examined at the project level. To cover this research gap, this study applies organizational ambidexterity theory to examine the effects among ambidextrous leadership, ambidextrous culture and sustainability-based project performance. Using a valid sample of 217 project leaders and members from Chinese construction projects, the method of multiple linear regression was adopted to assess the direct relationship among ambidextrous leadership, ambidextrous culture and project performance. Moreover, the bootstrapping technique through structural equation modeling, has been used to analyze the mediating effect of ambidextrous culture. Additionally, the sample data was divided into different groups according to the median value of the variables to conduct the ANOVA and to assess the within-group differences. The results indicated a positive and direct relationship that ambidextrous leadership has on project performance and ambidextrous culture. In addition, there was also a mediating impact of ambidextrous leadership on project performance via ambidextrous culture. Thus, ambidextrous leadership combined with transformational leadership as well as transactional leadership likely has a stronger positive impact on project performance through fostering the adaptive culture and consistent culture. Our findings contribute to an in-depth understanding of the role of the leader and culture for project outcomes. The project-based organization in construction projects could train project leaders’ ambidextrous leadership behavior to facilitate the formation of an ambidextrous culture and to increase project performance. Moreover, this study enriches the existing literature on leadership and project management by highlighting the important path of ambidextrous leadership and ambidextrous culture on the performance at the project level

  2. Managing complex, high risk projects a guide to basic and advanced project management

    CERN Document Server

    Marle, Franck

    2016-01-01

    Maximizing reader insights into project management and handling complexity-driven risks, this book explores propagation effects, non-linear consequences, loops, and the emergence of positive properties that may occur over the course of a project. This book presents an introduction to project management and analysis of traditional project management approaches and their limits regarding complexity. It also includes overviews of recent research works about project complexity modelling and management as well as project complexity-driven issues. Moreover, the authors propose their own new approaches, new methodologies and new tools which may be used by project managers and/or researchers and/or students in the management of their projects. These new elements include project complexity definitions and frameworks, multi-criteria approaches for project complexity measurement, advanced methodologies for project management (propagation studies to anticipate potential behaviour of the project, and clustering approaches...

  3. Managing a project's legacy: implications for organizations and project management

    Science.gov (United States)

    Cooper, Lynne P.; Hecht, Michael H.; Majchrzak, Ann

    2003-01-01

    Organizations that rely on projects to implement their products must find effective mechanisms for propagating lessons learned on one project throughout the organization. A broad view of what constitutes a project's 'legacy' is presented that includes not just the design products and leftover parts, but new processes, relationships, technology, skills, planning data, and performance metrics. Based on research evaluating knowledge reuse in innovative contexts, this paper presents an approach to project legacy management that focuses on collecting and using legacy knowledge to promote organizational learning and effective reuse, while addressing factors of post-project responsibility, information obsolescence, and the importance of ancillary contextual information. .

  4. The Environmental Management Project Manager's Handbook for improved project definition

    International Nuclear Information System (INIS)

    1995-02-01

    The United States Department of Energy (DOE) is committed to providing high quality products that satisfy customer needs and are the associated with this goal, DOE personnel must possess the knowledge, skills, and abilities to ensure successful job performance. In addition, there must be recognition that the greatest obstacle to proper project performance is inadequate project definition. Without strong project definition, DOE environmental management efforts are vulnerable to fragmented solutions, duplication of effort, and wastes resources. The primary means of ensuring environmental management projects meet cost and schedule milestones is through a structured and graded approach to project definition, which is the focus of this handbook

  5. Lessons Learned from Client Projects in an Undergraduate Project Management Course

    Science.gov (United States)

    Pollard, Carol E.

    2012-01-01

    This work proposes that a subtle combination of three learning methods offering "just in time" project management knowledge, coupled with hands-on project management experience can be particularly effective in producing project management students with employable skills. Students were required to apply formal project management knowledge to gain…

  6. Project management. A discipline which contributes to project success

    International Nuclear Information System (INIS)

    Hoch, G.

    2008-01-01

    The presentation covers the following topics: description of the Project - a contract was signed between KNPP and European Consortium Kozloduy (ECK) consisting of Framatome ANP GmbH as Leader (63%), Framatome ANP S.A.S. (17%), Atomenergoexport (20%) ; Project management in the modernization of NPP Kozloduy units 5 and 6; Project management process within AREVA NP GmbH; current status

  7. Project 2010 For Dummies

    CERN Document Server

    Muir, Nancy C

    2010-01-01

    A friendly reference guide to Microsoft Project, the leading enterprise project management software. As project management software, Microsoft Project allows you to oversee your business activities effectively. You can manage resources, share project info, perform modeling and scenario analysis, and standardize reporting processes. This easy-to-understand guide is completely updated to cover the latest changes and newest enhancements to Project 2010 and shows you how to get Project 2010 to work for you. After an introduction to basic project management concepts, you'll discover the mechanics o

  8. Next Generation Nuclear Plant Project Preliminary Project Management Plan

    International Nuclear Information System (INIS)

    Dennis J. Harrell

    2006-01-01

    This draft preliminary project management plan presents the conceptual framework for the Next Generation Nuclear Plant (NGNP) Project, consistent with the authorization in the Energy Policy Act of 2005. In developing this plan, the Idaho National Laboratory has considered three fundamental project planning options that are summarized in the following section. Each of these planning options is literally compliant with the Energy Policy Act of 2005, but each emphasizes different approaches to technology development risks, design, licensing and construction risks, and to the extent of commercialization support provided to the industry. The primary focus of this draft preliminary project management plan is to identify those activities important to Critical Decision-1, at which point a decision on proceeding with the NGNP Project can be made. The conceptual project framework described herein is necessary to establish the scope and priorities for the technology development activities. The framework includes: A reference NGNP prototype concept based on what is judged to be the lowest risk technology development that would achieve the needed commercial functional requirements to provide an economically competitive nuclear heat source and hydrogen production capability. A high-level schedule logic for design, construction, licensing, and acceptance testing. This schedule logic also includes an operational shakedown period that provides proof-of-principle to establish the basis for commercialization decisions by end-users. An assessment of current technology development plans to support Critical Decision-1 and overall project progress. The most important technical and programmatic uncertainties (risks) are evaluated, and potential mitigation strategies are identified so that the technology development plans may be modified as required to support ongoing project development. A rough-order-of-magnitude cost evaluation that provides an initial basis for budget planning. This

  9. From Project Management to Process Management - Effectively Organising Transdisciplinary Projects

    OpenAIRE

    Moschitz, Heidrun

    2013-01-01

    In transdisciplinary projects, the roles of researchers change. In addition to being a source of knowledge, they are required to engage in knowledge exchange processes. This results in an alteration at project level: researchers need to creatively manage projects as group processes.

  10. Marlim project finance; 'Project finance' de Marlim

    Energy Technology Data Exchange (ETDEWEB)

    D' Almeida, Albino Lopes [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2004-07-01

    Project Finance is often used worldwide to raise the funds to develop big projects, particularly in the area of power and infra-structure. It is designed to support a singular project and a specific purpose company is created to obtain the financing. The debt payment is secured by the enterprise's cash flow, avoiding real guarantee requirements. The lenders receive the future revenues and the property of the assets to be built. The risks are mitigated by agreements exhaustively negotiated among the parties. One of the most important Project Finances performed in Brazil is the Marlim Project, structured in order to complete the development of the Marlim oil field. This is the biggest Brazilian oil field, producing more than 500,000 barrels a day, almost 35% of the national production. This paper presents the general concepts related to this type of financing and general information about the project, including its structuring, negotiation and closing. The total commitment reaches US$ 1.5 billion obtained in both domestic and international markets through equity, bridge loan, bonds and commercial papers. Its whole life is 10 years, using 2 special purpose companies in its configuration. (author)

  11. Project Decision Chain

    DEFF Research Database (Denmark)

    Rolstadås, Asbjørn; Pinto, Jeffrey K.; Falster, Peter

    2015-01-01

    To add value to project performance and help obtain project success, a new framework for decision making in projects is defined. It introduces the project decision chain inspired by the supply chain thinking in the manufacturing sector and uses three types of decisions: authorization, selection......, and plan decision. A primitive decision element is defined where all the three decision types can be accommodated. Each task in the primitive element can in itself contain subtasks that in turn will comprise new primitive elements. The primitive elements are nested together in a project decision chain....

  12. Project management with dynamic scheduling baseline scheduling, risk analysis and project control

    CERN Document Server

    Vanhoucke, Mario

    2013-01-01

    The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in the project life cycle.

  13. Pilot Project: analysis, development and projection

    OpenAIRE

    Tapia Abril, Verónica Emilia; Chérrez Rodas, Karina; García Pesántez, Gabriela Rosana; Maldonado Marchán, María Elisa; Bustamante Montesdeoca, José Luis

    2014-01-01

    Since the introduction of ICT in architecture and teaching, pedagogies of education have faced their learning paradigms change. Institutes of higher education have folded to this motion and have undergone a process of change by implementing multimedia elements in their subjects. Through the pilot project educational videos that aim to meet the highest standards of educational videos described by Van Dam have been developed. The project expects to generate educational videos for different depa...

  14. Adaptation of Agile Project Management Methodology for Project Team

    Directory of Open Access Journals (Sweden)

    Rasnacis Arturs

    2015-12-01

    Full Text Available A project management methodology that defines basic processes, tools, techniques, methods, resources and procedures used to manage a project is necessary for effective and successful IT project management. Each company needs to define its own methodology or adapt some of the existing ones. The purpose of the research is to evaluate the possibilities of adapting IT project development methodology according to the company, company employee characteristics and their mutual relations. The adaptation process will be illustrated with a case study at an IT company in Latvia where the developed methodology is based on Agile Scrum, one of the most widespread Agile methods.

  15. EBFA project

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    An engineering project office was established during the fall of 1976 to manage and coordinate all of the activities of the Electron Beam Fusion Project. The goal of the project is to develop the Electron Beam Fusion Accelerator (EBFA) and its supporting systems, and integrate these systems into the new Electron Beam Fusion Facility (EBFF). Supporting systems for EBFA include a control/monitor system, a data acquistion/automatic data processing system, the liquid transfer systems, the insulating gas transfer systems, etc. Engineers and technicians were assigned to the project office to carry out the engineering design, initiate procurement, monitor the fabrication, perform the assembly and to assist the pulsed power research group in the activation of the EBFA

  16. Traditional Project Management and the Visual Workplace Environment to Improve Project Success

    Science.gov (United States)

    Fichera, Christopher E.

    2016-01-01

    A majority of large IT projects fail to meet scheduled deadlines, are over budget and do not satisfy the end user. Many projects fail in spite of utilizing traditional project management techniques. Research of project management has not identified the use of a visual workspace as a feature affecting or influencing the success of a project during…

  17. The project manager's desk reference: project planning, schedulding, evaluation, control, systems

    National Research Council Canada - National Science Library

    Lewis, James P

    2007-01-01

    In this Third Edition of The Project Manager's Desk Reference, top project management consultant James Lewis arms you with today's most comprehensive and understandable project management resources...

  18. Projectables

    DEFF Research Database (Denmark)

    Rasmussen, Troels A.; Merritt, Timothy R.

    2017-01-01

    CNC cutting machines have become essential tools for designers and architects enabling rapid prototyping, model-building and production of high quality components. Designers often cut from new materials, discarding the irregularly shaped remains. We introduce ProjecTables, a visual augmented...... reality system for interactive packing of model parts onto sheet materials. ProjecTables enables designers to (re)use scrap materials for CNC cutting that would have been previously thrown away, at the same time supporting aesthetic choices related to wood grain, avoiding surface blemishes, and other...... relevant material properties. We conducted evaluations of ProjecTables with design students from Aarhus School of Architecture, demonstrating that participants could quickly and easily place and orient model parts reducing material waste. Contextual interviews and ideation sessions led to a deeper...

  19. The Ethiopian Flora Project

    DEFF Research Database (Denmark)

    Demissew, Sebsebe; Brochmann, Christian; Kelbessa, Ensermu

    2011-01-01

    The account reviews and analyses the scietific projects derived from activities in connection with the Ethiopian Flora Project, including the [Ethiopian] Monocot Project, the Afro-alpine "Sky-island" project, the Vegetation and Ecological Conditions of Plantations Project, the Fire Ecology Projec...

  20. Project mechanisms challenges

    International Nuclear Information System (INIS)

    Perthuis, Ch. de

    2005-06-01

    The project mechanism complete the quotas systems concerning the carbon dioxide emissions market. The author explains and discusses these mechanisms and provides a panorama of the existing and developing projects. More specially she brings information on the mechanism of clean developments and renewable energies, the coordinated mechanisms, the agricultural projects, the financing of the projects and the exchange systeme of the New south Wales. (A.L.B.)

  1. J-PARC project

    International Nuclear Information System (INIS)

    Nagamiya, Shoji

    2004-01-01

    From Japanese fiscal year JFY01, which started on April 1, 2001, a new accelerator project to provide high-intensity proton beams proceeded into its construction phase. This project, which is now called the Japan Proton Accelerator Research Complex (J-PARC) project, is conducted under a cooperation of two institutions, KEK and Japan Atomic Energy Research Institution. We set a goal to achieve 1 MW proton beams at 3 GeV and 0.75 MW beams at 50 GeV. The project will be completed within six years, with the anticipated first beams in the spring of 2007. In this article I will describe (a) the project itself, (b) sciences to be pursued at this new accelerator complex and (c) the present status and future plans of the project

  2. How to Grow Project Scientists: A Systematic Approach to Developing Project Scientists

    Science.gov (United States)

    Kea, Howard

    2011-01-01

    The Project Manager is one of the key individuals that can determine the success or failure of a project. NASA is fully committed to the training and development of Project Managers across the agency to ensure that highly capable individuals are equipped with the competencies and experience to successfully lead a project. An equally critical position is that of the Project Scientist. The Project Scientist provides the scientific leadership necessary for the scientific success of a project by insuring that the mission meets or exceeds the scientific requirements. Traditionally, NASA Goddard project scientists were appointed and approved by the Center Science Director based on their knowledge, experience, and other qualifications. However the process to obtain the necessary knowledge, skills and abilities was not documented or done in a systematic way. NASA Goddard's current Science Director, Nicholas White saw the need to create a pipeline for developing new projects scientists, and appointed a team to develop a process for training potential project scientists. The team members were Dr. Harley Thronson, Chair, Dr. Howard Kea, Mr. Mark Goldman, DACUM facilitator and the late Dr. Michael VanSteenberg. The DACUM process, an occupational analysis and evaluation system, was used to produce a picture of the project scientist's duties, tasks, knowledge, and skills. The output resulted in a 3-Day introductory course detailing all the required knowledge, skills and abilities a scientist must develop over time to be qualified for selections as a Project Scientist.

  3. Something of value Governance of Projects in the Project-Based Organisation

    DEFF Research Database (Denmark)

    Riis, Eva

    2013-01-01

    The paper presents a conceptual framework for studying Governance of Projects and issues of value in the project-based organisation. Attempts at exploring and conceptualising the issues in the current literature are reviewed. Issues pertinent to gaining value by Governance of Projects have mainly...... for a better understanding of Governance of Projects and value contribution. The findings presented here form the conceptual foundation for subsequent empirical studies of value by Governance of Projects....... been explored from the perspective of economic theory. Models found in the literature are not typically concerned with value for the implementing organisation as a whole; their scope is limited to the time just after project completion. No valid, empirically-based models of value creation by Governance...

  4. Underestimation of Project Costs

    Science.gov (United States)

    Jones, Harry W.

    2015-01-01

    Large projects almost always exceed their budgets. Estimating cost is difficult and estimated costs are usually too low. Three different reasons are suggested: bad luck, overoptimism, and deliberate underestimation. Project management can usually point to project difficulty and complexity, technical uncertainty, stakeholder conflicts, scope changes, unforeseen events, and other not really unpredictable bad luck. Project planning is usually over-optimistic, so the likelihood and impact of bad luck is systematically underestimated. Project plans reflect optimism and hope for success in a supposedly unique new effort rather than rational expectations based on historical data. Past project problems are claimed to be irrelevant because "This time it's different." Some bad luck is inevitable and reasonable optimism is understandable, but deliberate deception must be condemned. In a competitive environment, project planners and advocates often deliberately underestimate costs to help gain project approval and funding. Project benefits, cost savings, and probability of success are exaggerated and key risks ignored. Project advocates have incentives to distort information and conceal difficulties from project approvers. One naively suggested cure is more openness, honesty, and group adherence to shared overall goals. A more realistic alternative is threatening overrun projects with cancellation. Neither approach seems to solve the problem. A better method to avoid the delusions of over-optimism and the deceptions of biased advocacy is to base the project cost estimate on the actual costs of a large group of similar projects. Over optimism and deception can continue beyond the planning phase and into project execution. Hard milestones based on verified tests and demonstrations can provide a reality check.

  5. ORGANIZATION OF FUTURE ENGINEERS' PROJECT-BASED LEARNING WHEN STUDYING THE PROJECT MANAGEMENT METHODOLOGY

    Directory of Open Access Journals (Sweden)

    Halyna V. Lutsenko

    2015-02-01

    Full Text Available The peculiarities of modern world experience of implementation of project-based learning in engineering education have been considered. The potential role and place of projects in learning activity have been analyzed. The methodology of organization of project-based activity of engineering students when studying the project management methodology and computer systems of project management has been proposed. The requirements to documentation and actual results of students' projects have been described in detail. The requirements to computer-aided systems of project management developed by using Microsoft Project in the scope of diary scheduling and resources planning have been formulated.

  6. Natural and CVD type diamond detectors as dosimeters in hadrontherapy applications

    International Nuclear Information System (INIS)

    Cirrone, G.A.P.; Cuttone, G.; Rafaele, L.; Sabini, M.G.; De Angelis, C.; Onori, S.; Pacilio, M.; Bucciolini, M.; Bruzzi, M.; Sciortino, S.

    2003-01-01

    Diamond is potentially a suitable material for use as radiation dosimeter; the wide band gap results in low dark currents and low sensitivity to visible light, the high carrier mobility can give rapid response, the very high density of strong bonds in the crystal structure make diamond very resistant to radiation damage; moreover it is tissue equivalent. The more recent advances in the synthesis of polycrystalline diamond by chemical vapour deposition (CVD) techniques have allowed the synthesis of material with electronic properties suitable for dosimetric application. In this paper we will report the results obtained in the study of the response of a natural diamond dosimeter and a CVD one irradiated with 62 AMeV proton beams to demonstrate their possible application in protontherapy

  7. Influence of Selected Stakeholders of Construction Investment Projects on the Course of Project

    Science.gov (United States)

    Bizon-Górecka, Jadwiga; Górecki, Jarosław

    2017-10-01

    The article presents an entity perspective of the construction investment projects. In a course of the project there are stakeholders who have an indirect influence (e.g. decision-makers in the selection of projects) or a direct influence (e.g. members of the project team). An intuitive opinion about a significant influence of project stakeholders on the project’s course encouraged the authors to undertake a research in this area. The article illustrates the initial phases of the construction project life cycle in a perspective of the entities and, in particular, a role of different stakeholders in making decisions that affect a course of the project. An analysis of the structure of the construction project life cycle makes a substantial involvement of various subjects in the initial phases of the project, i.e. in an initial phase and during a creation of the structures. A key point is to underline the factors of decision-making by the participants of the construction process. It was indicated that the stakeholders have a different impact on the course of the project. In large projects, which have many stakeholders, their role in the implementation of the investment project can vary, depending on the life cycle of the project. They can have positive or negative impacts on achieving the project objectives. The paper presents the results of 100 surveys made among participants of the building processes, executors of the construction projects in the Kuyavian-Pomeranian region. The study was conducted in December 2016 and January 2017. It revealed what is the impact of individual stakeholders of the construction projects on the course of the project. A special attention was paid to a complex relationship between objectives of the project and stakeholders’ goals. A great care to the smallest possible number of risks, which may arise from the different objectives of the project and its stakeholders’ goals, should be focused on the augmentation of correlation of

  8. Project Leadership and Quality Performance of Construction Projects

    Directory of Open Access Journals (Sweden)

    SPG Buba

    2017-05-01

    Full Text Available Background: The construction industry in Nigeria, is pigeonholed by poor quality of construction products as a result of the inherent corruption in the country. Lack of purposeful leadership and inappropriate choice of leadership styles in the industry have been attributed to project failure. Abandoned and failed projects are more predominant in the public sector which litters every corner of the country. Objectives: The objective of this paper is to assess the impact of leadership styles on quality performance criteria of public projects in Nigeria. Methodology: A total of 43 questionnaires were distributed to 3 key groups of respondents (Quantity Surveyors, Builders, and Architects who are project managers in Nigeria. Descriptive and Inferential statistics were used to analyse the data using the Statistical Package for Social Sciences (SPSS. Likert Scale was used to measure the independent variables (leadership style: facilitative, coaching, delegating and directing; and the level of achievement of projects based on the dependent variables (quality and function performance criteria which are: achieving highest aesthetic quality; and functional building that fits its purpose. Findings: The study revealed that Directing is the major leadership style used by project managers in Nigeria. Amongst the leadership styles which has the most impact on quality performance indicators is also directing which has the most relative influence on achieving highest aesthetic quality and functional building that fits its purpose. Conclusion/Recommendation/Way forward: The underlying relationship between Directing leadership styles and the performance criteria of achieving highest aesthetic quality and functional building that fits its purpose will be beneficial to the Nigerian construction environment.

  9. ORGANIZATIONAL PROJECT MANAGEMENT MATURITY

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2017-11-01

    Full Text Available The present article is aimed at developing a set of recommendations for achieving a higher level of organizational project maturity at a given enterprise. Methodology. For the purposes of the current research, the available information sources on the components of project management system are analysed; the essence of “organizational maturity” and the existing models of organizational maturity are studied. The method of systemic and structural analysis, as well as the method of logical generalization, are employed in order to study the existing models of organizational maturity, to describe levels of organizational maturity, and finally to develop a set of methodological recommendations for achieving a higher level of organizational project maturity at a given enterprise. The results of the research showed that the core elements of project management system are methodological, organizational, programtechnical, and motivational components. Project management encompasses a wide range of issues connected with organizational structure, project team, communication management, project participants, etc. However, the fundamental basis for developing project management concept within a given enterprise starts with defining its level of organizational maturity. The present paper describes various models of organizational maturity (staged, continuous, petal-shaped and their common types (H. Кеrzner Organizational Maturity Model, Berkeley PM Maturity Model, Organizational Project Management Maturity Model, Portfolio, Program & Project Management Maturity Model. The analysis of available theoretic works showed that the notion “organizational project maturity” refers to the capability of an enterprise to select projects and manage them with the intention of achieving its strategic goals in the most effective way. Importantly, the level of maturity can be improved by means of formalizing the acquired knowledge, regulating project-related activities

  10. Impact evaluation in multicultural educational projects : case: ADAPTYKES project

    OpenAIRE

    Kuusisto, Miika

    2014-01-01

    The objective of this thesis was to examine the common evaluation concepts of the European Union’s funded projects. Such concepts inter alia are effectiveness, impacts and sustainability. The aim was to study how these are realized in multicultural educational case–project in a context, where the project is funded by the European Commission’s Leonardo DaVinci Programme. Thesis introduces two evaluation approaches, which are Logical Framework Approach and Realistic evaluation model. The fi...

  11. Role of quality assurance vs project manager's responsibility for waste projects

    International Nuclear Information System (INIS)

    Solecki, J.

    1989-01-01

    This paper takes a project manager's perspective and discusses the role of the quality assurance organization in the development, implementation and interface related to the QA program for waste projects. The author describes the role which the QA program plays in allowing project management to assure that the project manager knows what is placed in the repository and the characteristics of the surrounding environment meet closure requirements

  12. BioProject

    Data.gov (United States)

    U.S. Department of Health & Human Services — The BioProject database provides an organizational framework to access information about research projects with links to data that have been or will be deposited...

  13. Project Management Techniques

    OpenAIRE

    Mihalache Anita; Salagean Liana

    2010-01-01

    Project management is a technique that can aid in the planning, scheduling, and monitoring of complex projects characterized by numerous, non repetitive jobs called activities. Examples of projects that would use project management include: - developing a mass rapid – transit system for a metropolitan area; - organizing the relocation of a corporate headquarters; - planning the production of a concert, film, or play; - developing and marketing a new automobile; - constructing a high – rise of...

  14. Choice of large projects

    Energy Technology Data Exchange (ETDEWEB)

    Harris, R

    1978-08-01

    Conventional cost/benefit or project analysis has generally not taken into account circumstances in which the project under consideration is large enough that its introduction to the economy would have significant general equilibrium effects. In this paper, rules are examined that would indicate whether such large projects should be accepted or rejected. The rules utilize information yielded by before-project and after-project equilibrium prices and production data. Rules are developed for the undistorted ''first-best'' case, the case in which the fixed costs of the project are covered by distortionary taxation, and for the case of projects producing public goods. 34 references.

  15. Project management best practices: forging win-win partnerships and mitigating power project risk

    International Nuclear Information System (INIS)

    Trowsdale, R.

    2006-01-01

    This paper discusses aspects of project management to mitigate power project risk. end-to-end project development involves development phase, permitting phase, implementation phase, and operational phase. Each phase involves a number of different elements. In renewable energy project good management requires maintaining project discipline and schedule throughout all phases. Project success requires commercial competitiveness, fuel availability, power sales contracts, stake holder support, permitting, effective execution, construction and good technical performance

  16. Harvard Project Physics Newsletter 10. The Project Physics Course, Text.

    Science.gov (United States)

    Harvard Univ., Cambridge, MA. Harvard Project Physics.

    A short description of the availability of Harvard Project Physics course components is given as is a discussion of the growth of the use of Project Physics in schools, including some enrollment data and survey results. Locations of the 1970 and 1971 Summer Institutes are listed. Adaptations of Project Physics course outside the United States are…

  17. Space Projects: Improvements Needed in Selecting Future Projects for Private Financing

    Science.gov (United States)

    1990-01-01

    The Office of Management and Budget (OMB) and NASA jointly selected seven projects for commercialization to reduce NASA's fiscal year 1990 budget request and to help achieve the goal of increasing private sector involvement in space. However, the efforts to privately finance these seven projects did not increase the commercial sector's involvement in space to the extent desired. The General Accounting Office (GAO) determined that the projects selected were not a fair test of the potential of increasing commercial investment in space at an acceptable cost to the government, primarily because the projects were not properly screened. That is, neither their suitability for commercialization nor the economic consequences of seeking private financing for them were adequately evaluated before selection. Evaluations and market tests done after selection showed that most of the projects were not viable candidates for private financing. GAO concluded that projects should not be removed from NASA's budget for commercial development until after careful screening has been done to determine whether adequate commercial demand exists, development risks are commercially acceptable and private financing is found or judged to be highly likely, and the cost effectiveness of such a decision is acceptable. Premature removal of projects from NASA's budget ultimately can cause project delays and increased costs when unsuccessful commercialization candidates must be returned to the budget. NASA also needs to ensure appropriate comparisons of government and private financing options for future commercialization projects.

  18. A new approach to cost effective projects: High performance project teams

    International Nuclear Information System (INIS)

    Chambers, N.C.

    1994-01-01

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment

  19. A new approach to cost effective projects: High performance project teams

    Energy Technology Data Exchange (ETDEWEB)

    Chambers, N.C. [Brown and Root Energy Services (United Kingdom)

    1994-12-31

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment

  20. Project Finance and Projects in the Energy Sector in Developing Countries

    OpenAIRE

    ERMELA KRIPA; HALIT XHAFA

    2013-01-01

    The purpose of this study is to show the importance of using project finance in infrastructure investments in developing countries. The paper will be focused only on one infrastructure sector, which is energy. Structurally, power project finance has involved largely buildown-transfer (BOT) project structures and long-term contracts. The projects largely reflect a rational allocation of risks among public and private participants. Private sponsors and lenders generally assume risks for complet...

  1. A Qualitative Study of the Relationship between a Banking IT Troubled Project and the Executive Project Sponsor's Project Management Maturity Level

    Science.gov (United States)

    Northcraft, Terry G.

    2017-01-01

    This qualitative study examined the effect the level of project management maturity a banking IT project sponsor has on project success. Project management maturity is gauged by the amount of modern project management training, knowledge and organizational skills an individual or organization has and applies to their project lifecycle experiences.…

  2. Expedited technology demonstration project (Revised mixed waste management facility project) Project baseline revision 4.0 and FY98 plan

    International Nuclear Information System (INIS)

    Adamson, M. G.

    1997-01-01

    The re-baseline of the Expedited Technology Demonstration Project (Revised Mixed Waste Facility Project) is designated as Project Baseline Revision 4.0. The last approved baseline was identified as Project Baseline Revision 3.0 and was issued in October 1996. Project Baseline Revision 4.0 does not depart from the formal DOE guidance followed by, and contained in, Revision 3.0. This revised baseline document describes the MSO and Final Forms testing activities that will occur during FY98, the final year of the ETD Project. The cost estimate for work during FY98 continues to be $2.OM as published in Revision 3.0. However, the funds will be all CENRTC rather than the OPEX/CENTRC split previously anticipated. LLNL has waived overhead charges on ETD Project CENRTC funds since the beginning of project activities. By requesting the $2.OM as all CENTRC a more aggressive approach to staffing and testing can be taken. Due to a cost under- run condition during FY97 procurements were made and work was accomplished, with the knowledge of DOE, in the Feed Preparation and Final Forms areas that were not in the scope of Revision 3.0. Feed preparation activities for FY98 have been expanded to include the drum opening station/enclosure previously deleted

  3. Projects as value constellations

    DEFF Research Database (Denmark)

    Laursen, Markus

    Creating value has been outlined as very central to projects applying the organizational perspective to projects. It has been suggested that value is created in value constellations or project networks, where actors work together to create value. However, research on the value creation process...... in value constellations is scarce, and through an exploratory study of two project networks in a cultural setting we investigate how value is created in value constellations. We outline how each project may be a distinct type of value constellation, one project creates value for the partners of the network...... as a consortium, and the project creates value primarily for others as a facilitator....

  4. Introduction to the Project

    DEFF Research Database (Denmark)

    Kuhn, Johan M.; Malchow-Møller, Nikolaj; Sørensen, Anders

    In this note a short introduction to the project “Employment Effects of Entrepreneurs” is presented. First, we describe the purpose of the project; second, we present the background; third, we briefly describe the three papers that constitute the output of the project, and fourth, we discuss two ...... important qualifications for the understanding of the contributions and results established in the project.......In this note a short introduction to the project “Employment Effects of Entrepreneurs” is presented. First, we describe the purpose of the project; second, we present the background; third, we briefly describe the three papers that constitute the output of the project, and fourth, we discuss two...

  5. Forecast Inaccuracies in Power Plant Projects From Project Managers' Perspectives

    Science.gov (United States)

    Sanabria, Orlando

    Guided by organizational theory, this phenomenological study explored the factors affecting forecast preparation and inaccuracies during the construction of fossil fuel-fired power plants in the United States. Forecast inaccuracies can create financial stress and uncertain profits during the project construction phase. A combination of purposeful and snowball sampling supported the selection of participants. Twenty project managers with over 15 years of experience in power generation and project experience across the United States were interviewed within a 2-month period. From the inductive codification and descriptive analysis, 5 themes emerged: (a) project monitoring, (b) cost control, (c) management review frequency, (d) factors to achieve a precise forecast, and (e) factors causing forecast inaccuracies. The findings of the study showed the factors necessary to achieve a precise forecast includes a detailed project schedule, accurate labor cost estimates, monthly project reviews and risk assessment, and proper utilization of accounting systems to monitor costs. The primary factors reported as causing forecast inaccuracies were cost overruns by subcontractors, scope gaps, labor cost and availability of labor, and equipment and material cost. Results of this study could improve planning accuracy and the effective use of resources during construction of power plants. The study results could contribute to social change by providing a framework to project managers to lessen forecast inaccuracies, and promote construction of power plants that will generate employment opportunities and economic development.

  6. Risks management in project planning

    OpenAIRE

    Stankevičiūtė, Roberta

    2017-01-01

    Project management consists of two very important aspects – managing the right project and managing the project right. To know that you are managing the right project you need to ensure that your project is based on an actual requirement and that your project goal is relevant and beneficial. And professional project planning assists in managing project the right way. The project planning process is very time consuming and is one of the most important parts of the project management process. T...

  7. FME Senior Project Managers: A Juggling Act of Multiple Projects | Poster

    Science.gov (United States)

    By Peggy Pearl, Contributing Writer It was not until the 1950s that organizations in the United States began to apply project management tools and techniques to complex construction and engineering projects (http://en.m.wikipedia.org/wiki/Project_life_cycle).

  8. Project Risk Management

    Science.gov (United States)

    Jr., R. F. Miles

    1995-01-01

    Project risk management is primarily concerned with performance, reliability, cost, and schedule. Environmental risk management is primarily concerned with human health and ecological hazards and likelihoods. This paper discusses project risk management and compares it to environmental risk management, both with respect to goals and implementation. The approach of the Jet Propulsion Laboratory to risk management is presented as an example of a project risk management approach that is an extension to NASA NHB 7120.5: Management of Major System Programs and Projects.

  9. Project mobilisation

    International Nuclear Information System (INIS)

    Clark, J.; Limbrick, A.

    1996-01-01

    This paper identifies and reviews the issues to be addressed and the procedures to be followed during the mobilisation of projects using LFG as an energy source. Knowledge of the procedures involved in project mobilisation, their sequence and probable timescales, is essential for efficient project management. It is assumed that the majority of projects will be situated on existing, licensed landfill sites and, in addition to complying with the relevant conditions of the waste management licence and original planning consent, any proposed developments on the site will require a separate planning consent. Experience in the UK indicates that obtaining planning permission rarely constitutes a barrier to the development of schemes for the utilisation of LFG. Even so, an appreciation of the applicable environmental and planning legislation is essential as this will enable the developer to recognise the main concerns of the relevant planning authority at an early stage of the project, resulting in the preparation of an informed and well-structured application for planning permission. For a LFG utilisation scheme on an existing landfill site, the need to carry out an environmental assessment (EA) as part of the application for planning permission will, in vitually all cases, be discretionary. Even if not deemed necessary by the planning authority, an EA is a useful tool at the planning application stage, to identify and address potential problems and to support discussions with bodies such as the Environment Agency, from whom consents or authorisations may be required. Carrying out an EA can thus provide for more cost-effective project development and enhanced environmental protection. Typically, the principal contractual arrangements, such as the purchase of gas or the sale of electricity, will have been established before the project mobilisation phase. However, there are many other contractural arrangements that must be established, and consents and permits that may be

  10. Project network-oriented materials management policy for complex projects

    DEFF Research Database (Denmark)

    Dixit, Vijaya; Srivastava, Rajiv K; Chaudhuri, Atanu

    2015-01-01

    This work devises a materials management policy integrated with project network characteristics of complex projects. It proposes a relative quantitative measure, overall criticality (OC), for prioritisation of items based on penalty incurred due to their non-availability. In complex projects...... managerial tacit knowledge which provides them enough flexibility to provide information in real form. Computed OC values can be used for items prioritisation and as shortage cost coefficient in inventory models. The revised materials management policy was applied to a shipbuilding project. OC values were......, practicing managers find it difficult to measure OC of items because of the subjective factors and intractable nature of penalties involved. However, using their experience, they can linguistically identify the antecedents and relate them to consequent OC. This work adopts Fuzzy Set Theory to capture...

  11. Building Project Competence

    DEFF Research Database (Denmark)

    Pemsel, Sofia; Wiewiora, Anna

    This research investigates the development of project competence, and particularly, three related dynamic capabilities (shifting, adapting, leveraging) that contribute to project competence development. In doing so, we make use of the emerging literature on knowledge governance and theorize how...... of dynamic capability building promoting project competence development....

  12. Organizations, projects and culture

    NARCIS (Netherlands)

    J. van Cleeff; Pieter van Nispen tot Pannerden

    2016-01-01

    Purpose: to explore and demonstrate the effects of organizational culture on projects, in particular project culture and project management style. Methodology/approach: descriptive and explorative; through students’ groups. Findings: the cultural relationship between organizations, their projects

  13. The Impact of Project Management Maturity upon IT/IS Project Management Outcomes

    Science.gov (United States)

    Carcillo, Anthony Joseph, Jr.

    2013-01-01

    Although it is assumed that increasing the institutionalization (or maturity) of project management in an organization leads to greater project success, the literature has diverse views. The purpose of this mixed methods study was to examine the correlation between project management maturity and IT/IS project outcomes. The sample consisted of two…

  14. Photovoltaic demonstration projects

    Energy Technology Data Exchange (ETDEWEB)

    Kaut, W [Commission of the European Communities, Brussels (Belgium); Gillett, W B; Hacker, R J [Halcrow Gilbert Associates Ltd., Swindon (GB)

    1992-12-31

    This publication, comprising the proceedings of the fifth contractor`s meeting organized by the Commission of the European Communities, Directorate-General for Energy, provides an overview of the photovoltaic demonstration projects which have been supported in the framework of the energy demonstration programme since 1983. It includes reports by each of the contractors who submitted proposals in 1987 and 1988, describing progress within their projects. Projects accepted from earlier calls for proposals and not yet completed were reviewed by a rapporteur and are discussed in the summary section. The results of the performance monitoring of all projects and the lessons drawn from the practical experience of the projects are also presented in the summaries and conclusions. Contractors whose projects were submitted in 1989 were also present at the meeting and contributed to the reported discussions. This proceeding is divided into four sessions (General, Housing, technical presentations, other applications) and 24 papers are offered.

  15. Knowledge Management in a Project Environment: Organisational CT and Project Influences

    OpenAIRE

    Polyaninova, Taya

    2011-01-01

    During a project implementation various forms of information and experience are generated within the organization. If this accumulated knowledge is not recorded and shared amongst other projects, this knowledge will be lost and no longer be available to assist future projects. This may lead to increased future projects costs as resources, time and money will be wasted on redefining the knowledge that once existed within the company. By not capturing and redeploying this knowledge, the quality...

  16. Using Project Complexity Determinations to Establish Required Levels of Project Rigor

    Energy Technology Data Exchange (ETDEWEB)

    Andrews, Thomas D.

    2015-10-01

    This presentation discusses the project complexity determination process that was developed by National Security Technologies, LLC, for the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office for implementation at the Nevada National Security Site (NNSS). The complexity determination process was developed to address the diversity of NNSS project types, size, and complexity; to fill the need for one procedure but with provision for tailoring the level of rigor to the project type, size, and complexity; and to provide consistent, repeatable, effective application of project management processes across the enterprise; and to achieve higher levels of efficiency in project delivery. These needs are illustrated by the wide diversity of NNSS projects: Defense Experimentation, Global Security, weapons tests, military training areas, sensor development and testing, training in realistic environments, intelligence community support, sensor development, environmental restoration/waste management, and disposal of radioactive waste, among others.

  17. Project time boxing and milestones as drivers for open design projects

    DEFF Research Database (Denmark)

    Tollestrup, Christian H. T.

    2015-01-01

    is very positive and that the structure, strict enforcement and rolling project management responsibility in a group work setting really helps them drive the project forward with high motivation. The main challenge lies in the balance between loading the teams with too many challenges and just providing......The Curriculums and programs in Problem Based Learning (PBL) utilizes the project-format in a team based setting for rehearsing the competencies of applying the design-oriented skills and knowledge learned in courses and workshops. If the project period is self-organised, there is a tendency......, because of the facilitated format where ‘disturbances’ are eliminated. If successful the state of creative flow is achieved. So how can we create a sense of urgency in longer project periods, not just workshop format, that would help a team of design students to engage and drive the project from the start...

  18. Projection Models 2010

    DEFF Research Database (Denmark)

    Illerup, J. B.; Birr-Pedersen, K.; Mikkelsen, M. H

    Models for projection of SO2-, NOx-, NMVOC- and NH3-emissions to the atmosphere have been developed and the Danish emissions have been projected until 2010 from a basis scenario including all implemented and planned measures. The projections of the four pollutants indicate that it may be difficult...

  19. Designing Project Management

    NARCIS (Netherlands)

    Heintz, John Linke; Lousberg, L.; Wamelink, J.W.F.; Saari, A.; Huovinen, P.

    2016-01-01

    In this paper we introduce the concept of Designing Project Management. On the basis of our earlier work, we suggest that there is still a gap between what is known from recent project management literature and what project managers can structurally help in the effectiveness of their work. Assuming

  20. Changing project finance climate; Project finance wo meguru kankyo henka

    Energy Technology Data Exchange (ETDEWEB)

    Madono, S. [The Export-Import Bank of Japan, Tokyo (Japan)

    1998-03-01

    Development of conditions under which project financing (PF) functions is described. PF, a method with which funds are procured for a project on the security of the assets of and the cash flow involving the project, established its position as a popular financial means. Into the 1990, however, PF underwent a complete change, when it came to be actively employed as a means for the procurement of money for what is called `infrastructure building project for invigorating the private sector` in the developing countries. PF has now come to be utilized for the financing of projects in various fields besides the field of resources exploitation. In particular, PF is now utilized in schemes such as BOT (build, operate, transfer) in public enterprises, for instance, electric power utilities in developing countries. The gravest problem found in the private sector invigorating type PF is that the sponsor, operator, exporter, and lender on their respective levels are experiencing rising risks because of intensified competition in the presence of a great number of projects. Such risks involve the exchange rate, the completion of work, and the relations between the borrower and operator. 2 figs.

  1. Ranking the Project Management Success Factors for Construction Project in South India

    Science.gov (United States)

    Aneesha, K.; Haridharan, M. K.

    2017-07-01

    In Today’s construction industry, to achieve a greater advantage over the firms, success of each project and efficiency is required. Effective Project Management overcomes these types of challenges. This study identifies the success factors which are important for project management in construction project success. From the literature review, 26 factors were found to be critical. Project managers, construction managers, civil engineers, contractors and site engineers were the respondents. After analyzing the data in SPSS software, the dominant factors from the regression analysis are top management support, competent project team, abilities to solve problems, realistic cost and time estimates, information/communication, competency of the project manager are the 6 factors out of 12 in 26 factors. Effective communication between stakeholders got highest priority and client involvement, good leadership, clarity of project goals got second priority. Informal communication gives better results compared to formal communications like written formats. To remove communication barrier with the stakeholders, informal communication like speaking face-to-face with the language this fits for the stakeholders.

  2. Project plan remove special nuclear material from PFP project plutonium finishing plant

    International Nuclear Information System (INIS)

    BARTLETT, W.D.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Remove Special Nuclear Material (SNM) Materials. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617, Rev. 0. This project plan is the top-level definitive project management document for PFP Remove SNM Materials project. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Remove SNM Materials project. Any deviations to the document must be authorized through the appropriate change control process

  3. Fast Flux Test Facility, Sodium Storage Facility project-specific project management plan

    International Nuclear Information System (INIS)

    Shank, D.R.

    1994-01-01

    This Project-Specific Project Management Plan describes the project management methods and controls used by the WHC Projects Department to manage Project 03-F-031. The Sodium Storage Facility provides for storage of the 260,000 gallons of sodium presently in the FFTF Plant. The facility will accept the molten sodium transferred from the FFTF sodium systems, and store the sodium in a solid state under an inert cover gas until such time as a Sodium Reaction Facility is available for final disposal of the sodium

  4. Fast Flux Test Facility, Sodium Storage Facility project-specific project management plan

    Energy Technology Data Exchange (ETDEWEB)

    Shank, D.R.

    1994-12-29

    This Project-Specific Project Management Plan describes the project management methods and controls used by the WHC Projects Department to manage Project 03-F-031. The Sodium Storage Facility provides for storage of the 260,000 gallons of sodium presently in the FFTF Plant. The facility will accept the molten sodium transferred from the FFTF sodium systems, and store the sodium in a solid state under an inert cover gas until such time as a Sodium Reaction Facility is available for final disposal of the sodium.

  5. Projection: A Bibliography.

    Science.gov (United States)

    Pedrini, D. T.; Pedrini, Bonnie C.

    Sigmund Freud and his associates did much clinical work with the dynamic of projection, especially with regard to paranoid symptoms and syndromes. Much experimental work has also been done with projection. Sears evaluated the results of some of those studies. Murstein and Pryer sub-classified projection and reviewed typical studies. The…

  6. Project Communications Management

    OpenAIRE

    José C. Santiago-Guevara; Mauricio Rojas-Contreras; Luis A. Esteban-Villamizar

    2013-01-01

    This article presents a review in relation to the object of study: Communications Management as an important factor in the management of projects. The review includes the most relevant and most renowned authors in the field of project management, focusing on telecommunications projects, which lets you define a communications management model.

  7. Teaching supply chain management through global projects with global project teams

    NARCIS (Netherlands)

    Kopczak, L.R.; Fransoo, J.C.

    2000-01-01

    In this article, we describe the Global Project Coordination Course, a course in which project teams composed of three students from each of two overseas universities execute company-sponsored projects dealing with global supply chain management issues. The $75,000 to $100,00 contributed in total by

  8. OMEGA project

    International Nuclear Information System (INIS)

    Shibuya, E.H.

    1989-01-01

    The OMEGA - Observation of Multiple particle production, Exotic Interactions and Gamma-ray Air Shower-project is presented. The project try to associate photosensitive detectors from experiences of hadronic interactions with electronic detectors used by experiences that investigate extensive atmospheric showers. (M.C.K.)

  9. Project Hanford management contract quality improvement project management plan; TOPICAL

    International Nuclear Information System (INIS)

    ADAMS, D.E.

    1999-01-01

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process

  10. Scrum Project Management

    CERN Document Server

    Pries, Kim H

    2010-01-01

    Scrum, which was originally invented solely for software development, can now be applied to all types of projects. This book shows project managers how to implement Scrum by explaining the artifacts, rituals, and roles used. The text provides Scrum planning methods to control project scope and schedule as well as Scrum tracking methods to focus teams on improving throughput and streamlining communications. The authors show how to combine traditional project methods with Scrum and how to adapt the familiar work breakdown structure to create Scrum backlogs and sprints. They also demonstrate how

  11. Momentum projection and relativistic boost of solitons: Coherent states and projection

    International Nuclear Information System (INIS)

    Luebeck, E.G.; Birse, M.C.; Henley, E.M.; Wilets, L.

    1986-01-01

    We present a method for calculating center-of-mass corrections to hadron properties in soliton models and we apply the method to the soliton bag model. A coherent state is used to provide a quantum wave function corresponding to the mean-field approximation. This state is projected onto a zero-momentum eigenstate. States of nonzero momentum can be constructed from this with a Lorentz boost operator. Hence center-of-mass corrections can be made in a properly relativistic way. The energy of the projected zero-momentum state is the hadron mass with spurious center-of-mass energy removed. We apply a variational principle to our projected state and use three ''virial theorems'' to test our approximate solution. We also study projection of general one-mode states. Projection reduces the nucleon energy by up to 25%. Variation after projection gives a further reduction of less than 20%. Somewhat larger reductions in the energy are found for meson states

  12. Project delivery system (PDS)

    CERN Document Server

    2001-01-01

    As business environments become increasingly competitive, companies seek more comprehensive solutions to the delivery of their projects. "Project Delivery System: Fourth Edition" describes the process-driven project delivery systems which incorporates the best practices from Total Quality and is aligned with the Project Management Institute and ISO Quality Standards is the means by which projects are consistently and efficiently planned, executed and completed to the satisfaction of clients and customers.

  13. Project management case studies

    CERN Document Server

    Kerzner, Harold R

    2013-01-01

    A new edition of the most popular book of project management case studies, expanded to include more than 100 cases plus a ""super case"" on the Iridium Project Case studies are an important part of project management education and training. This Fourth Edition of Harold Kerzner''s Project Management Case Studies features a number of new cases covering value measurement in project management. Also included is the well-received ""super case,"" which covers all aspects of project management and may be used as a capstone for a course. This new edition:Contains 100-plus case studies drawn from re

  14. Your Project Management Coach Best Practices for Managing Projects in the Real World

    CERN Document Server

    Biafore, Bonnie

    2012-01-01

    A pragmatic approach to project management Many projects fail to deliver on time or on budget, or even to deliver a workable product that satisfies the customer. While good project management goes a long way towards ensuring success, managers often fail to follow the plans they implement. This unique guide helps you understand and successfully handle project management, once and for all. Covering practical ways to solve problems you'll typically face when managing actual projects, this pragmatic book takes you through a full project management lifecycle. You'll find ample tips, tricks, and bes

  15. Strategy as Projects

    DEFF Research Database (Denmark)

    Lund Pedersen, Carsten; Ritter, Thomas; Andersen, Torben Juul

    This paper proposes the adoption of a project-based view to analyze strategy formation and strategic renewal over time. Projects are resource-committing, empirically-tracable investments, and as such, particularly suitable for the analysis of different manifestations of intended strategies as well...... as post-hoc manifestations of deviant, even rebellious, actions taken in opposition to the initial strategy announcement. The paper presents an analytical framework (a 5x2 matrix) of ten different project categories that together allows researchers to investigate how strategic renewal is realized through...... the enactment of different types of project initiatives throughout the organization. The developed framework is validated by two field studies that outline the robustness of the proposed matrix. In addition to the demonstration of the advantages of the framework, we discuss the limitations of the strategy-as-projects...

  16. Project quality assurance plant: Sodium storage facility, project F-031

    International Nuclear Information System (INIS)

    Shultz, J.W.; Shank, D.R.

    1994-11-01

    The Sodium Storage Facility Project Quality Assurance Plan delineates the quality assurance requirements for construction of a new facility, modifications to the sodium storage tanks, and tie-ins to the FFTF Plant. This plan provides direction for the types of verifications necessary to satisfy the functional requirements within the project scope and applicable regulatory requirements determined in the Project Functional Design Criteria (FDC), WHC-SD-FF-FDC-009

  17. Bi-project management in engineering complex industrial construction projects

    NARCIS (Netherlands)

    Velde, Robert R. van der; Donk, Dirk Pieter van

    2000-01-01

    Engineering large industrial construction projects is usually a complex task with several co-operating actors. This paper investigates such projects, characterised by two main actors: the owner of the installation (the client organisation) responsible for the engineering of the production process,

  18. Beyond theory : Towards a probabilistic causation model to support project governance in infrastructure projects

    NARCIS (Netherlands)

    Chivatá Cárdenas, Ibsen; Voordijk, Johannes T.; Dewulf, Geert

    2017-01-01

    A new project governance model for infrastructure projects is described in this paper. This model contains causal mechanisms that relate a number of project governance variables to project performance. Our proposed model includes relevant variables for measuring project governance in construction

  19. Researchers' experience with project management in health and medical research: Results from a post-project review

    Science.gov (United States)

    2011-01-01

    Background Project management is widely used to deliver projects on time, within budget and of defined quality. However, there is little published information describing its use in managing health and medical research projects. We used project management in the Alcohol and Pregnancy Project (2006-2008) http://www.ichr.uwa.edu.au/alcoholandpregnancy and in this paper report researchers' opinions on project management and whether it made a difference to the project. Methods A national interdisciplinary group of 20 researchers, one of whom was the project manager, formed the Steering Committee for the project. We used project management to ensure project outputs and outcomes were achieved and all aspects of the project were planned, implemented, monitored and controlled. Sixteen of the researchers were asked to complete a self administered questionnaire for a post-project review. Results The project was delivered according to the project protocol within the allocated budget and time frame. Fifteen researchers (93.8%) completed a questionnaire. They reported that project management increased the effectiveness of the project, communication, teamwork, and application of the interdisciplinary group of researchers' expertise. They would recommend this type of project management for future projects. Conclusions Our post-project review showed that researchers comprehensively endorsed project management in the Alcohol and Pregnancy Project and agreed that project management had contributed substantially to the research. In future, we will project manage new projects and conduct post-project reviews. The results will be used to encourage continuous learning and continuous improvement of project management, and provide greater transparency and accountability of health and medical research. The use of project management can benefit both management and scientific outcomes of health and medical research projects. PMID:21635721

  20. The Impact of Project Organizational Culture on the Performance of Construction Projects

    Directory of Open Access Journals (Sweden)

    Luong Hai Nguyen

    2017-05-01

    Full Text Available Cultural influence has recently received significant attention from academics due to its vital role in the success or failure of a project. In the construction industry, several empirical investigations have examined the influence of culture on project management. The aim of this study is to determine the impact of project organizational culture on the performance of construction projects. A total of 199 completed construction projects in Vietnam with specific data gathering through questionnaires were analyzed. The findings reveal that contractor commitment to contract agreements is the most significant cultural factor affecting project performance. Goal alignment and reliance, contractor commitment, and worker orientation (i.e., commitment to workers contribute to improved overall performance and participant satisfaction. Contractor commitment and cooperative orientation enhance labor productivity, whereas goal alignment and trust and contractor commitment ensure learning performance (i.e., learning from experience. The findings of this study may assist construction professionals in implementing practices that can contribute to the sustainability and success of construction projects.

  1. Project of the Year Submittal SY-101 Surface Level Rise Remediation Project

    International Nuclear Information System (INIS)

    BAUER, R.E.

    2001-01-01

    CH2M HILL Hanford Group is pleased to nominate the SY-101 Surface Level Rise Remediation Project (SLRRP) for the Project Management Institute's consideration as International Project of the Year for 2001. We selected this project as being our best recent example of effective project management, having achieved and exceeded our client's expectations in resolving urgent safety issues related to the storage of high level nuclear waste. In reflection, we consider the SY-101 SLRRP to be a prime example of safe and effective project delivery. The pages that follow present the tools and techniques employed to manage this complex and technically challenging project. Our objective in submitting this nomination is twofold--to share the lessons we have learned with other organizations, and to honor the men and women who contributed to this endeavor. It was by their diligent effort that the successes we relate here were accomplished 10 months ahead of schedule and one million dollars below the authorized budget

  2. New Accelerator Projects

    International Nuclear Information System (INIS)

    Delahaye, J.P.

    2010-01-01

    There is large number of ambitious accelerator projects with promising performances in the near (and short term) future which aims at exploring energy and/or luminosity frontiers and Complementary aspects of various particles species. High Energy Physics requirements are extremely demanding with challenging parameters: entering into the new territories of the tera-scale data, high Energy or/and High (Integrated) Luminosity, high performance, high availability, long lifetime, luminosity leveling etc.. New projects are more and more challenging: larger, more powerful, more expensive, technology above present standard. Innovative ideas and breakthrough on novel technologies are key for HEP adventure. Aggressive R and D is imperative on beam and Technology related, on cost and power consumption mitigation.. There is ambitious Test Facilities to address feasibility. More and more time and (M and P) resources are required from first ideas to project proposal: it is of prime importance to launch R and D early, explore all possible options of schemes and technologies (anticipating future Physics requests), make realistic status and schedule estimates (preserve credibility and make reasonable plans). Global Collaboration is mandatory from the R and D phase to the construction and operation in order to make best use of limited resources and available expertise as inspired from successful collaborations on Detectors. The global strategy of new accelerator projects in truly world-wide collaboration aims at: - defining all various Projects and Technology options worth exploring, - taking advantage of global teams made of world-wide experts, and of synergies to address common issues (generic R and D) of various projects, - preparing together plethora of project proposals to cover Physics Landscape (ready for window opportunity), - developing Collaborative/Competition (Experts in Collaboration, Technology and Projects options in Competition), - Joining resources on (few) selected

  3. Freedom Project

    Directory of Open Access Journals (Sweden)

    Alejandra Suarez

    2014-02-01

    Full Text Available Freedom Project trains prisoners in nonviolent communication and meditation. Two complementary studies of its effects are reported in this article. The first study is correlational; we found decreased recidivism rates among prisoners trained by Freedom Project compared with recidivism rates in Washington state. The second study compared trained prisoners with a matched-pair control group and found improvement in self-reported anger, self-compassion, and certain forms of mindfulness among the trained group. Ratings of role-plays simulating difficult interactions show increased social skills among the group trained by Freedom Project than in the matched controls.

  4. Project Finance: Basic Components

    OpenAIRE

    Alfieri Li Ojeda, Jaime

    2015-01-01

    The natural speed of the contemporary world demands large investment projects which require specialized financial techniques such as Project Finance, defined as a fund to finance investment projects of great magnitude. Every Project Finance involves a wide range of elements such as promoters, government, contractors andsuppliers, among others, that will ensure project success. La rapidez del mundo contemporáneo exige que los grandes proyectos de inversión requieran de técnicas financieras ...

  5. Managing externally financed projects: the Integrated Primary Health Care Project in Bolivia.

    Science.gov (United States)

    Homedes, N

    2001-12-01

    Bolivia is one of the poorest countries in Latin America. Health indicators are very poor, communicable diseases are prevalent and, coupled with malnutrition, remain the major killers of children under 5 years old. The Integrated Primary Health Care Project (PROISS) was a US$39 million project executed by the Ministry of Health (MOH), 50% financed by the World Bank and aimed at improving primary health care in the four largest Bolivian municipalities. The implementation of the project started in 1990 and ended in 1997. During implementation it went through three distinct phases: Phase 1 (1990-94) was a period characterized by conflict and confusion; Phase 2 (1995-mid-1996) documented major improvements in coverage and service quality; and Phase 3 (mid-1996-97) witnessed the decline of the project. This paper explores the factors that contributed to the success and the decline of the project, draws lessons for project managers and international agencies involved in the definition and implementation of social sector projects, and discusses the unlikelihood that externally financed projects can have a sustainable impact on the development of the health sector of recipient countries.

  6. MANAGING MULTICULTURAL PROJECT TEAMS

    Directory of Open Access Journals (Sweden)

    Cezar SCARLAT

    2014-06-01

    Full Text Available The article is based on literature review and authors’ own recent experience in managing multicultural project teams, in international environment. This comparative study considers two groups of projects: technical assistance (TA projects versus information technology (IT projects. The aim is to explore the size and structure of the project teams – according to the team formation and its lifecycle, and to identify some distinctive attributes of the project teams – both similarities and differences between the above mentioned types of projects. Distinct focus of the research is on the multiculturalism of the project teams: how the cultural background of the team members influences the team performance and team management. Besides the results of the study are the managerial implications: how the team managers could soften the cultural clash, and avoid inter-cultural misunderstandings and even conflicts – in order to get a better performance. Some practical examples are provided as well.

  7. Earned value project management

    CERN Document Server

    Fleming, Quentin W

    2010-01-01

    Organizations that follow the principles of good Earned Value Management (EVM) create an environment that allows teams to successfully operate and thrive ? even in the face of challenges that could negatively impact their projects. Earned Value Project Management (EVPM) is a methodology used to measure and communicate the real physical progress of a project taking into account the work completed, the time taken and the costs incurred to complete that work. As a result, EVPM allows more educated and effective management decision-making, which helps evaluate and control project risk by measuring project progress in monetary terms. In the first two editions of Earned Value Project Management, Quentin W. Fleming and Joel M. Koppelman provided guidance for project management practitioners already familiar with EVPM, was well as those who were new to the use of this technique. The third edition expanded the information available on of EVPM for medium and smaller projects while still being relevant for larger projec...

  8. Clustering ERP implementation project activities: a foundation for project size definition

    NARCIS (Netherlands)

    Janssens, G.; Kusters, R.J.; Heemstra, F.J.; Sadiq, A.; Reichert, M.; Schultz, K.; Trienekens, J.J.M.; Moller, C.; Kusters, R.J.

    2007-01-01

    The size of an ERP project can be a useful measurement for predicting the effort needed to complete an ERP implementation project. Because this measurement does not exist, research is needed to find a set of variables which can define the size of an ERP implementation project. This paper shows 21

  9. Scheduling for decommissioning projects

    International Nuclear Information System (INIS)

    Podmajersky, O.E.

    1987-01-01

    This paper describes the Project Scheduling system being employed by the Decommissioning Operations Contractor at the Shippingport Station Decommissioning Project (SSDP). Results from the planning system show that the project continues to achieve its cost and schedule goals. An integrated cost and schedule control system (C/SCS) which uses the concept of earned value for measurement of performance was instituted in accordance with DOE orders. The schedule and cost variances generated by the C/SCS system are used to confirm management's assessment of project status. This paper describes the types of schedules and tools used on the SSDP project to plan and monitor the work, and identifies factors that are unique to a decommissioning project that make scheduling critical to the achievement of the project's goals. 1 fig

  10. Managing Distributed Software Projects

    DEFF Research Database (Denmark)

    Persson, John Stouby

    Increasingly, software projects are becoming geographically distributed, with limited face-toface interaction between participants. These projects face particular challenges that need careful managerial attention. This PhD study reports on how we can understand and support the management...... of distributed software projects, based on a literature study and a case study. The main emphasis of the literature study was on how to support the management of distributed software projects, but also contributed to an understanding of these projects. The main emphasis of the case study was on how to understand...... the management of distributed software projects, but also contributed to supporting the management of these projects. The literature study integrates what we know about risks and risk-resolution techniques, into a framework for managing risks in distributed contexts. This framework was developed iteratively...

  11. Innovations in project activities

    Directory of Open Access Journals (Sweden)

    Serbskaya O.V.

    2016-11-01

    Full Text Available this article considers the ways of project management, models of project management: classical model and the model of flexible designing Agile, pays more attention to the process of project management using Agile model and to the problems of using the project management models in modern conditions.

  12. The Llama Project.

    Science.gov (United States)

    Ganzel, Candy; Stuglik, Jan

    2003-01-01

    At a suburban Indiana elementary school, the Project Approach serves as the basis of the curriculum in all Kindergarten classrooms. The four classes of 5- and 6-year-old children at this school chose to study llamas. This article discusses how the project evolved, describes the three phases of the project, and provides teachers' reflections on the…

  13. Power supply projects a collection of innovative and practical design projects

    CERN Document Server

    Maplin

    1996-01-01

    Using circuit diagrams, PCB layouts, parts lists and clear construction and installation details, this book provides everything someone with a basic knowledge of electronics needs to know in order to put that knowledge into practice.This latest collection of Maplin projects are a variety of power supply projects, the necessary components for which are readily available from the Maplin catalogue or any of their high street shops. Projects include, laboratory power supply projects for which there are a wide range of applications for the hobbyist, from servicing portable audio and video equipment

  14. Ultra advanced projects. ; Naming hyper-hightech projects. (Cho) no tsuku project. ; Naming no shikumi

    Energy Technology Data Exchange (ETDEWEB)

    Goto, Y. (Ministry of International Trade and Industry, Tokyo (Japan))

    1992-10-05

    Significance of using 'super' for naming a project of technological development is discussed. Functions of naming are classified into (1) recognition, (2) display and (3) sales-promotion, whereby mechanism of naming of merchandise that is developed through the technique of 3 is considered. Further, the mechanism of naming is discussed in relation to marketing. It is pointed out that naming of merchandise is determined on the basis of (1) concept of planned goods and (2) marketing-mixes composed of goods, price, sales-roots and sales-promotion. The same mechanism works also in a project for technological development. Technical trends are caught and projects are targetted by taking supposed regimes into account, thereby the most suitable mix is formed. The mix in the technological development is assumed to be composed of purpose, specification, regime and sales-promotion. Two examples of the governmental projects by Ministry of International Trade and Industry, 'the big regime for research and development on industrial technologies' and 'the regime for development of the fundamental technologies in the next generation' are introduced and the significance of their naming is described. 2 tabs.

  15. The IT project manager competencies that impact project success – A qualitative research

    Directory of Open Access Journals (Sweden)

    Cíntia Cristina Silva de Araújo

    2015-07-01

    Full Text Available Since there is a lack of studies about the relationship of IT project manager competencies and project success, this paper will address the following research question: Which competencies should IT project managers develop in order to achieve success in IT projects? To answer this question, we conducted a qualitative research with an exploratory approach. To collect data, twelve (12 in-depth interviews were done with Brazilian project managers from different companies from several business sectors. The analysis results pointed out that for our respondents the most needed category of competencies are team management, business domain knowledge,  communication, project management and people skills. As other authors have affirmed, technical skills were considered to be less relevant to project success than interpersonal and intrapersonal competencies.

  16. The HGF strategy project

    International Nuclear Information System (INIS)

    Knebel, J.U.; Fellmoser, F.; Lefhalm, C.; Mack, K.; Pettan, C.; Piecha, H.; Konys, J.; Adelhelm, C.; Glasbrenner, H.; Muscher, H.; Novotny, J.; Voss, Z.; Wedemeyer, O.; Mueller, G.; Heinzel, A.; Schumacher, G.; Huber, R.; Zimmermann, F.; Groetzbach, G.; Dorr, B.; Carteciano, L.N.

    2000-01-01

    Within the Hermann von Helmholtz-Gemeinschaft Deutscher Forschungszentren (HGF) an HGF-Strategy Fund Project entitled 'Innovative Technologies to Reduce Radiotoxicity' is funded since October 1999. The objectives of this HGF-Strategy Fund Project is the development of new methods and technologies to design and manufacture thin-walled and highly thermally-loaded surfaces which are cooled by a corrosive heavy liquid metal (lead-bismuth eutectic). The result of this project will be the basic scientific-technical tool which allows the conception and the design of a European Demonstrator of an ADS system (cf. 32.23.05). The work performed at Forschungszentrum Karlsruhe is embedded in a broad European research and development programme on ADS systems. The project is divided in three sub-projects: Sub-Project 1: Thermalhydraulic Investigations, Sub-Project 2: Material Specific Investigations, Sub-Project 3: Oxygen Control System. This progress report gives a general description of the project and its envisaged objectives. As a selection of the results achieved, first, FLUTAN calculations for the COULI beam window design and, second, the oxygen control system for the KArlsruhe Lead LAboratory KALLA are described in detail. Finally, the design and status of KALLA is given. (orig.)

  17. IT Project Management Metrics

    Directory of Open Access Journals (Sweden)

    2007-01-01

    Full Text Available Many software and IT projects fail in completing theirs objectives because different causes of which the management of the projects has a high weight. In order to have successfully projects, lessons learned have to be used, historical data to be collected and metrics and indicators have to be computed and used to compare them with past projects and avoid failure to happen. This paper presents some metrics that can be used for the IT project management.

  18. Distributed Project Work

    DEFF Research Database (Denmark)

    Borch, Ole; Kirkegaard, B.; Knudsen, Morten

    1998-01-01

    for information exchange in the traditional project environment is performed. A group of teachers and a student group using small project examples test the method. The first test group used a prototype for testing and found the new activity synchronization difficult to adapt, so the method was finally adjusted...... to be very precises and with success used on the second test group. Distributed project work is coming pretty soon and with little improvement in server tools, projects in different topics with a large and inhomogeneous profile of users are realistic.......Project work has been used for many years at Aalborg University to improve learning of theory and methods given in courses. In a closed environment where the students are forming a group in a single room, the interaction behaviour is more or less given from the natural life. Group work...

  19. Bioenergy/Biotechnology projects

    Energy Technology Data Exchange (ETDEWEB)

    Napper, Stan [Louisiana Tech Univ., Ruston, LA (United States); Palmer, James [Louisiana Tech Univ., Ruston, LA (United States); Wilson, Chester [Louisiana Tech Univ., Ruston, LA (United States); Guilbeau, Eric [Louisiana Tech Univ., Ruston, LA (United States); Allouche, Erez [Louisiana Tech Univ., Ruston, LA (United States)

    2012-06-30

    This report describes the progress of five different projects. The first is an enzyme immobilization study of cellulase to reduce costs of the cellulosic ethanol process. High reusability and use of substrates applicable to large scale production were focus areas for this study. The second project was the development of nanostructured catalysts for conversion of syngas to diesel. Cobalt nanowire catalyst was used in Fischer-Tropsch synthesis. The third project describes work on developing a microfluidic calorimeter to measure reaction rates of enzymes. The fourth project uses inorganic polymer binders that have the advantage of a lower carbon footprint than Portland cement while also providing excellent performance in elevated temperature, high corrosion resistance, high compressive and tensile strengths, and rapid strength gains. The fifth project investigates the potential of turbines in drop structures (such as sewer lines in tall buildings) to recover energy.

  20. Statistical Techniques for Project Control

    CERN Document Server

    Badiru, Adedeji B

    2012-01-01

    A project can be simple or complex. In each case, proven project management processes must be followed. In all cases of project management implementation, control must be exercised in order to assure that project objectives are achieved. Statistical Techniques for Project Control seamlessly integrates qualitative and quantitative tools and techniques for project control. It fills the void that exists in the application of statistical techniques to project control. The book begins by defining the fundamentals of project management then explores how to temper quantitative analysis with qualitati

  1. Project Management Communication 2.0

    DEFF Research Database (Denmark)

    Berggreen, Line; Kampf, Constance Elizabeth

    2015-01-01

    How can we understand project management communication practices for developing effective practices in professional and technical communication? In this article we explore an approach to project management that focuses on projects as having a technical documentation structure with content...... that is developed through social or interpersonal communication practices. Looking at the broader picture of project management which besides the implementation phase also includes conception, planning and closure, we see a project management framework that brings together both technical and social aspects...... of project communication. To understand how this works, we interviewed project managers about their understanding and strategy in communicating about the projects they lead. Findings demonstrate that more experienced project managers have a more nuanced understanding of project communication as both...

  2. Four Approaches to Project Evaluation

    DEFF Research Database (Denmark)

    Laursen, Markus; Svejvig, Per; Rode, Anna Le Gerstrøm

    . Each of the framework’s four approaches provides a distinct evaluation that sheds light on some issues while leaving others unattended. Following these lines, the paper calls for more multi-faceted project evaluations. Introducing a framework that can help analyze existing evaluations and structure......There are many theoretical and practical reasons for evaluating projects – including explorative arguments focusing on expanding descriptive knowledge on project work as well as normative arguments focusing on improving prescriptive models of project performance. Despite the need for project...... management methodologies that work and combat project failure, and research methods that can assess effective project management and methodologies, as well as empirical research on the actuality of projects as practice, evaluation research on projects including project management and methodologies is scarce...

  3. Salt Repository Project: FY 85 technical project plan

    International Nuclear Information System (INIS)

    1985-07-01

    The FY 85 technical plan for the Salt Repository Project is briefly presented. The objectives of the project in relation to the Civilian Radioactive Waste Management Program are discussed, and the technical activities directed toward accomplishing these objectives are detailed. A budget is presented for each of the Level 2 work breakdown structure tasks (Systems, Waste Package, Site, Repository, Regulatory and Institutional, Exploratory Shaft, Test Facilities, Land Acquisition, and Project Management) in the various sections. An overall description, current status, and planned activities are presented for each of the subtasks which make up the above-mentioned Level 2 tasks. A strategy diagram and a master schedule are included and each of the milestones is also listed chronologically in the sections

  4. MORE. Management of Requirements in NPP modernisation projects - Project report 2005

    International Nuclear Information System (INIS)

    Thunem, A.P.J.; Fredriksen, R.; Thunem, H.P.J.; Ventae, O.; Valkonen, J.; Holmberg, J.E.

    2006-04-01

    The overall objective of the project MORE is to improve the means for managing the large amounts of evolving requirements in Nordic NPP modernisation projects. In accordance to this objective, the activity will facilitate the industrial utilisation of the research results from the project TACO. On the basis of experiences in the Nordic countries, the overall aim of the TACO project has been to identify the best practices and most important criteria for ensuring effective communication in relation to requirements elicitation and analysis, understandability of requirements to all parties, and traceability of requirements. The project resulted in the development of a traceability model for handling requirements from their origins and through their final shapes. Particular emphasis for the MORE project in 2005 was put on utilising a prototype of a tool (TRACE) intended to support an adopted approach to dependable requirements engineering, suitable for modelling and handling large amounts of requirements related to all stages of the systems development process and not only those traditionally including requirements at high-level stages. (au)

  5. MORE. Management of Requirements in NPP modernisation projects - Project report 2005

    Energy Technology Data Exchange (ETDEWEB)

    Thunem, A.P.J.; Fredriksen, R.; Thunem, H.P.J. [IFE (Norway); Ventae, O.; Valkonen, J.; Holmberg, J.E. [VTT Technical Research Centre of Finland (Finland)

    2006-04-15

    The overall objective of the project MORE is to improve the means for managing the large amounts of evolving requirements in Nordic NPP modernisation projects. In accordance to this objective, the activity will facilitate the industrial utilisation of the research results from the project TACO. On the basis of experiences in the Nordic countries, the overall aim of the TACO project has been to identify the best practices and most important criteria for ensuring effective communication in relation to requirements elicitation and analysis, understandability of requirements to all parties, and traceability of requirements. The project resulted in the development of a traceability model for handling requirements from their origins and through their final shapes. Particular emphasis for the MORE project in 2005 was put on utilising a prototype of a tool (TRACE) intended to support an adopted approach to dependable requirements engineering, suitable for modelling and handling large amounts of requirements related to all stages of the systems development process and not only those traditionally including requirements at high-level stages. (au)

  6. Flat-plate solar array project. Volume 8: Project analysis and integration

    Science.gov (United States)

    Mcguire, P.; Henry, P.

    1986-01-01

    Project Analysis and Integration (PA&I) performed planning and integration activities to support management of the various Flat-Plate Solar Array (FSA) Project R&D activities. Technical and economic goals were established by PA&I for each R&D task within the project to coordinate the thrust toward the National Photovoltaic Program goals. A sophisticated computer modeling capability was developed to assess technical progress toward meeting the economic goals. These models included a manufacturing facility simulation, a photovoltaic power station simulation and a decision aid model incorporating uncertainty. This family of analysis tools was used to track the progress of the technology and to explore the effects of alternative technical paths. Numerous studies conducted by PA&I signaled the achievement of milestones or were the foundation of major FSA project and national program decisions. The most important PA&I activities during the project history are summarized. The PA&I planning function is discussed and how it relates to project direction and important analytical models developed by PA&I for its analytical and assessment activities are reviewed.

  7. Methodologies of Project Management

    Directory of Open Access Journals (Sweden)

    Wojciech Macek

    2011-07-01

    Full Text Available This paper presents comparison of three most popular project management standardsbelonging to a wider group of models (for example, PMBOK, Prince 2, CMMI, ISO 10006,BS 6079, IPMA Competence Baseline, European Commission Project Cycle ManagementGuidelines. The author discusses methods of project management according to PMBoK,Prince 2 and ISO 10006, some chosen criteria and fields of knowledge, such as generalregulations of standards, project range management, resources management, and processesconnected with risk, systems of project quality management.

  8. MRS project management

    International Nuclear Information System (INIS)

    Doman, J.W.; Vlahakis, J.

    1992-01-01

    Management of projects under the control of the Office of Civilian Radioactive Waste Management within the Department of Energy is subject to overview by a variety of internal and external entities. This paper reports that effective project management often requires balancing of conflicting directions and conflicting agendas of the different entities in order to proceed with implementation of the Monitored Retrievable Storage project

  9. The Canada Goose Project: A First Project with Children under 3

    Science.gov (United States)

    Brewer, Ruth A.

    2010-01-01

    This project report describes how five children (an infant, three toddlers, and a preschooler) enrolled at a private day care home engaged in their first journey into project work through a study of Canada geese living on a nearby body of water. Prior to the experience described in this paper, the author had used the Project Approach only with…

  10. Project-based fieldwork: perspectives of graduate entry students and project sponsors.

    Science.gov (United States)

    Fortune, Tracy; McKinstry, Carol

    2012-08-01

    This article builds on an earlier viewpoint regarding the need for project-focussed fieldwork. It presents the findings of an evaluative study into the value of project placements undertaken by final year graduate entry master's students as part of a capstone subject. The authors argue that provision of project placements enable impending graduates to develop and implement macro level strategies to develop prevention, resource and service development skills often required of contemporary occupational therapy practitioners. A qualitative approach is adopted. Student cohorts from 2005 and 2006 completed open-ended, written questionnaires, and agency project sponsors were interviewed to obtain their perspectives of the project placement experience. Despite some concern that project placements might be undertaken at the expense of 'clinical' placements these findings reveal that projects managed by students were perceived by services to add great value enabling them to advance important priorities. Students and sponsors highlighted a range of positive learning outcomes, including the ability to work collaboratively with supervisors and develop advanced communication skills and political acumen. The success of such placements depends on supportive supervision from academic staff. CONCLUSIONS AND SIGNIFICANCE OF THE STUDY: The findings promote project placements as a highly authentic aspect of work integrated learning enabling learners to draw together a range of attributes that support the ability to manage complex issues that have occupational relevance at a macro level. In addition, such experiences help learners to develop agency and political acumen both increasingly important capabilities for the contemporary workplace. © 2012 The Authors Australian Occupational Therapy Journal © 2012 Occupational Therapy Australia.

  11. The virtual GULLIVER project

    NARCIS (Netherlands)

    Trappl, R.; Nijholt, Antinus; Stuk, M.; Zwiers, Jakob

    2002-01-01

    In this paper we discuss our virtual reality project Gulliver. This project is part of a more comprehensive project conceived by two artists, Matjaž Štuk and Alena Hudcovicová, called “Gulliver’s Museum of Living Art��?. Our part of the project involves a virtual reality version of Swift’s Gulliver

  12. Earth System Science Project

    Science.gov (United States)

    Rutherford, Sandra; Coffman, Margaret

    2004-01-01

    For several decades, science teachers have used bottles for classroom projects designed to teach students about biology. Bottle projects do not have to just focus on biology, however. These projects can also be used to engage students in Earth science topics. This article describes the Earth System Science Project, which was adapted and developed…

  13. Interactions of the NAEG information support project with other projects

    International Nuclear Information System (INIS)

    Pfuderer, H.A.

    1976-01-01

    In the past year the Information Support Project to the Nevada Applied Ecology Group has interacted with many other research projects on the transuranics and other radionuclides. Group interactions through symposiums, workshops, and responding to search requests have proven to be mutually beneficial. The NAEG Information Support Project will draw on the information resources of the Oak Ridge National Laboratory to produce a bibliography of the radionuclides (other than the transuranics) of interest to the Nevada Test Site

  14. Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project

    Energy Technology Data Exchange (ETDEWEB)

    David Duncan

    2011-05-01

    This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.

  15. Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project

    International Nuclear Information System (INIS)

    Duncan, David

    2011-01-01

    This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.

  16. The Human Genome Diversity Project

    Energy Technology Data Exchange (ETDEWEB)

    Cavalli-Sforza, L. [Stanford Univ., CA (United States)

    1994-12-31

    The Human Genome Diversity Project (HGD Project) is an international anthropology project that seeks to study the genetic richness of the entire human species. This kind of genetic information can add a unique thread to the tapestry knowledge of humanity. Culture, environment, history, and other factors are often more important, but humanity`s genetic heritage, when analyzed with recent technology, brings another type of evidence for understanding species` past and present. The Project will deepen the understanding of this genetic richness and show both humanity`s diversity and its deep and underlying unity. The HGD Project is still largely in its planning stages, seeking the best ways to reach its goals. The continuing discussions of the Project, throughout the world, should improve the plans for the Project and their implementation. The Project is as global as humanity itself; its implementation will require the kinds of partnerships among different nations and cultures that make the involvement of UNESCO and other international organizations particularly appropriate. The author will briefly discuss the Project`s history, describe the Project, set out the core principles of the Project, and demonstrate how the Project will help combat the scourge of racism.

  17. MORE: Management of requirements in NPP modernisation projects. Project report 2007

    International Nuclear Information System (INIS)

    Fredriksen, R.; Katta, V.; Raspotnig, C.; Valkonen, J.

    2008-03-01

    This report documents the work and related activities of the MORE project in the period January 1 - December 31 in 2007. The focus of this report is on improvements of the former project results, to identify and apply a couple of case studies from NPP projects, and activities in order to initiate and implement the industrial take-up and utilisation of the research results in real modernisation projects. The report also provides a brief description of the extended industrial network and disseminations of the results in Nordic and NKS related events such as seminars and workshops. (au)

  18. MORE: Management of requirements in NPP modernisation projects. Project report 2007

    Energy Technology Data Exchange (ETDEWEB)

    Fredriksen, R.; Katta, V.; Raspotnig, C. [Institutt for energiteknikk (IFE) (Norway); Valkonen, J. [Technical Research Centre of Finland (VTT) (Finland)

    2008-03-15

    This report documents the work and related activities of the MORE project in the period January 1 - December 31 in 2007. The focus of this report is on improvements of the former project results, to identify and apply a couple of case studies from NPP projects, and activities in order to initiate and implement the industrial take-up and utilisation of the research results in real modernisation projects. The report also provides a brief description of the extended industrial network and disseminations of the results in Nordic and NKS related events such as seminars and workshops. (au)

  19. Scaffolding Project-Based Learning with the Project Management Body of Knowledge (PMBOK[R])

    Science.gov (United States)

    van Rooij, Shahron Williams

    2009-01-01

    This paper reports the results of a study of the extent to which processes and procedures from the discipline of project management can scaffold online project-based learning in a graduate-level instructional technology course, by facilitating intra-team interaction, enhancing project outcomes and promoting a positive project team experience. With…

  20. The 100 People Project

    Science.gov (United States)

    McLeod, Keri

    2007-01-01

    This article describes the 100 People Project and how the author integrates the project in her class. The 100 People Project is a nonprofit organization based in New York City. The organization poses the question: If there were only 100 people in the world, what would the world look like? Through the project, students were taught about ethics in…

  1. PROJECT MANAGEMENT AND RELATIONSHIP MARKETING: INTERSECTIONS FOR STAKEHOLDER MANAGEMENT IN PROJECTS

    Directory of Open Access Journals (Sweden)

    Ronielton Rezende Oliveira

    2017-06-01

    Full Text Available Projects development is essential for organizations. Among the factors originated in projects that influence performance is quality. This variable must be managed to meet the expectations of the stakeholders and this can only be achieved through effective monitoring and control. It can be seen that relationship marketing is relevant to the competitive reality of contemporary organizations. With the purpose of contributing to organizational studies, this theoretical essay proposes to approach project management in relationship marketing. In the context of integrated management, it is discussed how management action can be applied to engage and involve stakeholders in projects, in order to create value and achieve the expectations sustained by the execution of the projects. Based on the reflection, the quality of relationship management is pointed out as a construct of higher order, composed of at least two dimensions: trust and satisfaction.

  2. How Agile Methods Conquers General Project Management - The Project Half Double Initiative

    DEFF Research Database (Denmark)

    Tordrup Heeager, Lise; Svejvig, Per; Schlichter, Bjarne Rerup

    2016-01-01

    Increased complexity in projects has forced new project management initiatives. In software development several agile methods have emerged and methods such as Scrum are today highly implemented in practice. General project management practice has been inspired by agile software development...

  3. SLIM (secondary emission monitor for low interception monitoring) an innovative non-destructive beam monitor for the extraction lines of a hadrontherapy centre

    International Nuclear Information System (INIS)

    Gibson, P.N.; Holzwarth, U.; Abbas, K.

    2005-01-01

    Real time monitoring of hadron therapy beam intensity and profile is a critical issue for the optimisation of dose delivery to carcinogenic tissue, patient safety and operation of the accelerator complex. For this purpose an innovative beam monitor, SLIM (Secondary electron emission for Low Interception Monitoring) is being developed in the framework of the EC-funded SUCIMA (Silicon Ultra-fast Cameras for electrons and gamma sources In Medical Application) project. The detector system is based on the secondary emission of electrons by a non-perturbative, sub-micron thick Al foil placed directly in the extracted beam path. The secondary electrons, accelerated by an electrostatic focusing system, are detected by a monolithic silicon position-sensitive sensor, which provides the beam intensity and its position with a precision of 1 mm at 10 kHz frame rate. The results of the laboratory tests of the first system prototype with thermoionic electrons emitted from a hot Tungsten wire are presented together with the measurements performed on a low intensity hadron beam at the Cyclotron of the Joint Research Centre in Ispra. (author)

  4. Innovative Project Activities in Science [From the NSTA Study of Innovative Project Activities

    Science.gov (United States)

    Science Teacher, 1975

    1975-01-01

    Describes four projects chosen as innovative project activities in science which exhibited identification of unique or novel problems and creative approaches to their solutions. Projects included a study of fish in Lake Erie, a goat raising project, an analysis of terrestrial plant ecology and soil composition, and a study of marine and wetlands…

  5. LEX Project

    DEFF Research Database (Denmark)

    Damkilde, Lars; Larsen, Torben J.; Walbjørn, Jacob

    This document is aimed at helping all parties involved in the LEX project to get a common understanding of words, process, levels and the overall concept.......This document is aimed at helping all parties involved in the LEX project to get a common understanding of words, process, levels and the overall concept....

  6. Psychological effects of exercise on community-dwelling older adults

    Directory of Open Access Journals (Sweden)

    Tada A

    2018-02-01

    Full Text Available Akio Tada Faculty of Health Science, Hyogo University, Kakogawa, Hyogo, Japan Background: In recent years, there have been an increasing number of older adults who suffer from mental disorders globally.Objective: The objective of this study was to examine the effect of an intervention that consisted of an exercise program to improve the mental health of community-dwelling older adults.Participants and methods: The recruited participants of this study were community-dwelling older adults aged ≥60 years who participated in a comprehensive health promotion program in Kakogawa, Japan. Participants in the intervention group received an exercise program that was developed for older adults using Thera-Band. To measure participants’ mental health status, a Japanese version of the short form of the Profile of Mood States (POMS-SF was used. Stress markers were measured, such as salivary cortisol, alpha-amylase, and sIgA levels. All participants provided salivary samples and completed psychological questionnaires at baseline and 6-month follow-up.Results: No significant differences were observed between the intervention and control groups with respect to POMS-SF score and salivary biomarker profile at baseline. After the intervention, the intervention group showed a significant decrease in the POMS-SF “fatigue” score and cortisol level. No significant changes were observed in the control group.Conclusion: Simultaneous changes in feelings of fatigue and cortisol levels were observed among subjects who had received the intervention of regular exercise. Further research is needed to investigate the effectiveness of exercise intervention in improving mental health among older adults. Keywords: intervention, exercise, psychological status, stress, cortisol

  7. Epidemiological evaluation of YAG capsulotomy incidence for posterior capsule opacification in various intraocular lenses in Japanese eyes

    Directory of Open Access Journals (Sweden)

    Nishi Y

    2015-09-01

    Full Text Available Yutaro Nishi,1,2 Tomohiro Ikeda,1 Kayo Nishi,2 Osamu Mimura1 1Department of Ophthalmology, Hyogo College of Medicine, Hyogo, 2Nishi Eye Hospital, Osaka, Japan Background and objective: We investigated the yttrium aluminum garnet (YAG capsulotomy rates in various intraocular lenses (IOLs. Study design/patients and methods: We retrospectively analyzed 23,440 eyes implanted with either MA60BM, MA60AC, VA-60BB, CeeOnEdge, Clariflex, Technis Z9002, SI-40NB, or UV26T IOLs. We calculated the YAG capsulotomy rates at 1, 3, 5, and 10 years post lens implantation. Results: YAG capsulotomy rates at 3 years postimplantation for the eight groups of IOLs were, respectively, 3.7%, 3.9%, 23.7%, 3.4%, 4.5%, 4.7%, 10.4%, and 21.0%. YAG capsulotomy rates at 10 years postimplantation for the MA60BM and SI-40NB IOLs were, respectively, 9.1% and 15% (P<0.05. The average YAG rates for all sharp-edged and round-edged IOLs at 5 years postimplantation were, respectively, 5.2%±0.7% and 25.6%±9.0% (P<0.05. Conclusion: In all studied IOLs, posterior capsule opacification prevention seemed to be associated with the posterior optic sharp-edge design. Round-edged silicone IOLs may also retard posterior capsule opacification formation, though not as much as sharp-edged IOLs. As the follow-up period progressed, round-edged silicone IOLs showed significantly higher YAG rates than sharp-edged IOLs. Keywords: silicone, intraocular lenses, sharp optic edge, chi-square test, implantation surgery, posterior capsule opacification

  8. Managing Projects with KPRO

    Science.gov (United States)

    Braden, Barry M.

    2004-01-01

    How does a Project Management Office provide: Consistent, familiar, easily used scheduling tools to Project Managers and project team members? Provide a complete list of organization resources available for use on the project? Facilitate resource tracking and visibility? Provide the myriad reports that the organization requires? Facilitate consistent budget planning and cost performance information? Provide all of this to the entire organization? Provide for the unique requirement of the organization? and get people to use it? Answer: Implementation of the Kennedy space Center Projects and Resources Online (KPRO), a modified COTS solution.

  9. Project studies and engaged scholarship

    DEFF Research Database (Denmark)

    Geraldi, Joana; Söderlund, Jonas

    2016-01-01

    and to rejuvenate these research directions. Design/methodology/approach The authors propose the umbrella term: “project studies” to denote the research related to projects and temporary organizing. Project studies is conceived not only as a body of research, but also as a social process embedded in research...... scholars, who’s “job” goes beyond the writing of articles and research applications, and includes shaping discourses of project research, nurturing new project scholars, contributing to project practice and carefully considering the legacy of projects and project studies in society. Originality......Purpose In 2006, the “Rethinking Project Management” network called for a paradigm shift in project research, and proposed five research directions. The directions inspired research and marked a milestone in the development of the field. The purpose of this paper is to reflect on the past decade...

  10. Introduction to the Project

    DEFF Research Database (Denmark)

    Kuhn, Johan M.; Malchow-Møller, Nikolaj; Sørensen, Anders

    In this note a short introduction to the project “Employment Effects of Entrepreneurs” is presented. First, we describe the purpose of the project; second, we present the background; third, we briefly describe the three papers that constitute the output of the project, and fourth, we discuss two...... important qualifications for the understanding of the contributions and results established in the project....

  11. The New Mexico Technology Deployment Pilot Project: A technology reinvestment project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    The New Mexico Technology Deployment Project (NMTDP) has been in operation for slightly more than two years. As one of the original TRP projects, NMTDP had the charter to develop and validate a new model for technology extraction which emphasized focused technology collaboration, early industry involvement, and a strong dual use commercialization and productization emphasis. Taken in total, the first two years of the NMTDP have been exceptionally successful, surpassing the goals of the project. This report describes the accomplishments and evolution of the NMTDP to date and discusses the future potential of the project. Despite the end of federal funding, and a subsequent reduction in level of effort, the project partners are committed to continuation of the project.

  12. Project plan remove special nuclear material from PFP project plutonium finishing plant; TOPICAL

    International Nuclear Information System (INIS)

    BARTLETT, W.D.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Remove Special Nuclear Material (SNM) Materials. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617,Rev. 0. This project plan is the top-level definitive project management document for PFP Remove SNM Materials project. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Remove SNM Materials project. Any deviations to the document must be authorized through the appropriate change control process

  13. Result of design and test operation of a coal boiler at Hyogo Refinery

    Energy Technology Data Exchange (ETDEWEB)

    Miura, Yasuhiko; Sato, Noriyuki

    1987-05-01

    This boiler is the first coal boiler for the oil refineries in Japan (Installed in Oct., 1986 at Idemitsu Petrochemical Co.) Causes for using coal as a fuel are a conversion to less expensive fuel and offering a technical service to the users of coal through the combustion of coal and learning of a handling technique. The type of boiler is Babcock single barrel radiant type and has 150 t/d capacity with single fuel combustion of coal. Auxiliary equipments are a pulverizer, a transportation and storage unit, a denitration unit, a dust collector, a desulfurization unit, and an ash disposal unit. Main considerations in the design are measures for the security of finely pulverized coal, clogging prevention for coal and ash. A test operation revealed 7 % of combustible loss and 160 - 250 ppm of NOx content at a charge inlet of denitration unit. Actual operation exhibited no clogging at the denitration unit of troubles due to scaling. Design for raw materials is to blend 4 imported coals (from Australia and Canada, etc) and 3 Japanese ones. (7 figs, 2 tabs)

  14. Project management plan for the 105-C Reactor interim safe storage project. Revision 1

    International Nuclear Information System (INIS)

    Miller, R.L.

    1997-01-01

    In 1942, the Hanford Site was commissioned by the US Government to produce plutonium. Between 1942 and 1955, eight water-cooled, graphite-moderated reactors were constructed along the Columbia River at the Hanford Site to support the production of plutonium. The reactors were deactivated from 1964 to 1971 and declared surplus. The Surplus Production Reactor Decommissioning Project (BHI 1994b) will decommission these reactors and has selected the 105-C Reactor to be used as a demonstration project for interim safe storage at the present location and final disposition of the entire reactor core in the 200 West Area. This project will result in lower costs, accelerated schedules, reduced worker exposure, and provide direct benefit to the US Department of Energy for decommissioning projects complex wide. This project sets forth plans, organizational responsibilities, control systems, and procedures to manage the execution of the Project Management Plan for the 105-C Reactor Interim Safe Storage Project (Project Management Plan) activities to meet programmatic requirements within authorized funding and approved schedules. The Project Management Plan is organized following the guidelines provided by US Department of Energy Order 4700.1, Project Management System and the Richland Environmental Restoration Project Plan (DOE-RL 1992b)

  15. Project Management Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    1995-04-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition suitable for an extended period of minimum surveillance and maintenance (S ampersand M) and as quickly and economically as possible. Implementation and completion of the deactivation project will further reduce the already small risks to the environment and to public safety and health. Furthermore, the project should result in significant S ampersand M cost savings in the future. The IFDP management plan has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted a strategy to deactivate the simple facilities first, to reduce the scope of the project, and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify those activities, that best promote the project mission and result in largest cost savings. The Work Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory (Energy Systems 1994) defines the project schedule, the cost estimate, and the technical approach for the project

  16. We Scrum Every Day: Using Scrum Project Management Framework for Group Projects

    Science.gov (United States)

    Pope-Ruark, Rebecca

    2012-01-01

    Collaborative group projects have documented learning benefits, yet collaboration is challenging for students because the educational system values individual achievement. This article explores Scrum, an approach to framing, planning, and managing group projects used in Web-software development. Designed for multi-faceted projects, this approach…

  17. Why does project planning fail

    International Nuclear Information System (INIS)

    Foley, M.; Luciano, G.

    1991-01-01

    The technology of project controls have become increasingly sophisticated. Some say that the technological advancements of the Nineteen-Eighties represented a maturation of project control tools. Others say that the advancements were merely bells and whistles that added little or nothing to the project management process. Above it all, as we enter the Nineties, there is a popular outcry to get back to the basics of planning. The genesis of this outcry is the sobering impact of significant cost overruns and schedule extensions, even on projects that have employed the most advanced project control tools and systems. This paper examines the merits of taking a strategic approach to the project planning process. Within that context, there are basic goals of planning which are enduring through the life cycle of the project. Key reasons for failure and inability to achieve the goals of project planning are explained. By examining the goals of project planning and the reasons for failure, insight is provided into the role of project controls specialists and sophisticated project control tools in meeting the challenges of complex project management in the 1990's

  18. MANAGING LARGE INVESTMENT PROJECTS IN GORJ

    Directory of Open Access Journals (Sweden)

    CÎRNU DORU

    2016-12-01

    Full Text Available Currently, the concept of project management is considered to be the best concept for efficient management of a project, so it is used all over the world, and most recently in our country. This concept is designed with all the general characteristics of project management, but adapted to the large investment projects. This paper presents the project management concept and project management organization for capital projects. This concept is conceived with all general characteristics of project management, but adopted to the condition of large investment projects. The concept also includes the project team and the project manager, the person authorized and responsible for achieving the objectives planned in the project. For efficient managing by project, it is necessary to insure a good compozition of project team, as a team of people who, in collaboration with project manager, work directly on managing the project. To effectively manage the project, it is necessary to ensure a proper composition of the project team, a team of people who, in collaboration with the project manager to work directly for project management. It is a particularly good method of achieving the objectives planned projects, which means a project with a certain level of performance required in a planned time, with planned costs.

  19. Project management for profit a failsafe guide to keeping projects on track and on budget

    CERN Document Server

    Knight, Joe; Angus, Brad; Case, John

    2012-01-01

    If your work involves projects, then this book is for you. It will show every company owner and project manager—at businesses large and small—how to run projects differently. You’ll benefit if you’ve ever: • been over budget on a project • exceeded a timeline on a project • worked on a project that completely stalled as you neared the finish line • lost money on a sure-thing project and had no idea why • noticed that scope and feature creep held you back • watched a project take three times as long as planned • felt too embarrassed to perform a review of your successes and failures • wondered whether your project actually made any money By the time you finish the book, you’ll be ready to implement Project Management for Profit in your own company—and be prepared to keep your projects on track and on budget.

  20. Relationships and project marketing success

    DEFF Research Database (Denmark)

    Skaates, Maria Anne; Tikkanen, Henrikki; Lindblom, Jarno

    2002-01-01

    Project operations are a dominating mode of international business. Managing relationships and networks is crucial to project marketing success both at the level of the individual project and at the level of multiple projects. This article first defines key characteristics of project business, id...

  1. PROJECT FINANCE AS A TOOL FOR THE IMPLEMENTATION OF INVESTMENT PROJECTS

    Directory of Open Access Journals (Sweden)

    U. V. Vsyakih

    2015-02-01

    Full Text Available The article discusses the reasons for the insufficient use of project financing in the Russian Federation, the brief historical background for the project financing in Russia, as well as the main principles, types and stages of project financing. For results was used theoretical methods associated with the study of general and specialized literature, as well as methods of analysis and synthesis.

  2. An Exploratory Study of the Effects of Project Finance on Project Risk Management : How the Distinguishing Attributes of Project Finance affects the Prevailing Risk Factor?

    OpenAIRE

    Chan, Ka Fai

    2011-01-01

    Project finance is a financing arrangement for projects, and it is characterised by the creation of a legally independent project company financed with non- or limited recourse loans. It is observed that the popularity of project finance is increasing in the recent decades, despite of the impact of Asian financial crisis. Especially in emerging markets, project finance is very common among the public-private partnership projects. It is possible that project finance yields some benefits in pro...

  3. Project Management in Real Time: A Service-Learning Project

    Science.gov (United States)

    Larson, Erik; Drexler, John A., Jr.

    2010-01-01

    This article describes a service-learning assignment for a project management course. It is designed to facilitate hands-on student learning of both the technical and the interpersonal aspects of project management, and it involves student engagement with real customers and real stakeholders in the creation of real events with real outcomes. As…

  4. Fundamentals of Project Management

    CERN Document Server

    Heagney, Joseph

    2011-01-01

    With sales of more than 160,000 copies, Fundamentals of Project Management has helped generations of project managers navigate the ins and outs of every aspect of this complex discipline. Using a simple step-by-step approach, the book is the perfect introduction to project management tools, techniques, and concepts. Readers will learn how to: ò Develop a mission statement, vision, goals, and objectives ò Plan the project ò Create the work breakdown structure ò Produce a workable schedule ò Understand earned value analysis ò Manage a project team ò Control and evaluate progress at every stage.

  5. Visualizations as Projection Devices

    DEFF Research Database (Denmark)

    Harty, Chris; Holm Jacobsen, Peter; Tryggestad, Kjell

    The aim of this paper is to inquire into the role of project visualizations in shaping healthcare spaces and practices. The study draws upon an ethnographic field study from a large on-going hospital construction project in Denmark, and focuses on the early phases of on-boarding the design team...... into the project organization. During the on-boarding visualizations multiplies in form, content and purpose, ranging from paper and digitally based projections of clinical work spaces and practices for the future hospital building in use, to paper and digitally based projections of the cost budget and time...

  6. Agile Project Management For Dummies

    CERN Document Server

    Layton, Mark C

    2012-01-01

    Be flexible and faster with Agile project management As mobile and web technologies continue to evolve rapidly, there is added pressure to develop and implement software projects in weeks instead of months. Agile Project Management For Dummies can make that happen. This is the first book to provide a simple, step-by-step guide to Agile Project Management approaches, tools, and techniques. With the fast pace of mobile and web technology development, software project development must keep pace; Agile Project Management enables developers to complete and implement projects more quickly and this b

  7. Three domains of project organising

    OpenAIRE

    Winch, Graham M.

    2014-01-01

    It has become axiomatic in research on project organising that projects are temporary organisations. Yet there are a number of challenges to this axiom: research on matrix organisation, the embeddedness of projects in project ecologies, and projectification all emphasise the relationship of the project to permanent organisations. Similarly, research on project-based firms and owner organisations which are relatively permanent challenges this axiom. This paper develops a conceptual framework w...

  8. 1995 project of the year Hanford Environmental compliance project nomination

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, J.R.

    1996-02-01

    The completion of the Hanford Environmental Compliance (HEC) Project in December 1995 brought to a successful close a long line of major contributions to environmental cleanup. Not since the early days of the Hanford Site during and shortly after World War 11 had such a large group of diverse construction activities, with a common goal, been performed at Hanford. Key to this success was the unique combination of 14 subprojects under the HEC Project which afforded the flexibility to address evolving subproject requirements. This strategy resulted in the accomplishment of the HEC Project stakeholders` objectives on an aggressive schedule, at a $33 million cost savings to the customer. The primary objectives of the HEC Project were to upgrade selected Hanford Site facilities and systems to bring them into compliance with current environmental standards and regulations. The HEC Project contributed significantly towards the Hanford site compliance with Clean Water Act, Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements. It provided, in part, those construction activities required to comply with those requirements in the areas of liquid and solid waste treatment and disposal, waste characterization, and groundwater monitoring.

  9. 1995 project of the year Hanford Environmental compliance project nomination

    International Nuclear Information System (INIS)

    Kelly, J.R.

    1996-02-01

    The completion of the Hanford Environmental Compliance (HEC) Project in December 1995 brought to a successful close a long line of major contributions to environmental cleanup. Not since the early days of the Hanford Site during and shortly after World War 11 had such a large group of diverse construction activities, with a common goal, been performed at Hanford. Key to this success was the unique combination of 14 subprojects under the HEC Project which afforded the flexibility to address evolving subproject requirements. This strategy resulted in the accomplishment of the HEC Project stakeholders' objectives on an aggressive schedule, at a $33 million cost savings to the customer. The primary objectives of the HEC Project were to upgrade selected Hanford Site facilities and systems to bring them into compliance with current environmental standards and regulations. The HEC Project contributed significantly towards the Hanford site compliance with Clean Water Act, Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements. It provided, in part, those construction activities required to comply with those requirements in the areas of liquid and solid waste treatment and disposal, waste characterization, and groundwater monitoring

  10. Multi-Role Project (MRP): A New Project-Based Learning Method for STEM

    Science.gov (United States)

    Warin, Bruno; Talbi, Omar; Kolski, Christophe; Hoogstoel, Frédéric

    2016-01-01

    This paper presents the "Multi-Role Project" method (MRP), a broadly applicable project-based learning method, and describes its implementation and evaluation in the context of a Science, Technology, Engineering, and Mathematics (STEM) course. The MRP method is designed around a meta-principle that considers the project learning activity…

  11. Efficient and Effective Project Management

    Directory of Open Access Journals (Sweden)

    Dusan Pene

    2014-03-01

    Full Text Available The purpose of the article is to investigate different authorities and responsibilities of a project manager and of a project leader. Considering the fact that nowadays the project management is becoming the important factor in performing and leading the investments which are modified by modern leadership theories, we can say that the key element is the sovereign leadership of a manager and a project leader. The current multi-project environments and modern techniques at the project management area need the interdisciplinary leadership approach and at the same time they enable the strengthening of company’s competitive features so they are consistently satisfying high project expectations of the project investor or a client.

  12. Earthquake-proof test of the bookshelf; Shoka no taishinsei shiken

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-10-01

    The seismic fragility testing was carried out on the bookshelf of 2 types 4 bodies submitted from the Co.,Ltd. primary steel industry place. (1) The vibration testing by seismic wave. The excitation by the Hyogo-ken Nanbu Earthquake wave is carried out. The following are examined: Behavior of test specimen for seismic wave, degree of the damage, response speed. (2) The sweep test. The sweep excitation of the sine wave in which the frequency automatically decreases is carried out, while the acceleration is fixedly kept. The following are examined: Behavior of test specimen, degree of the damage, response speed, and resonance point. (NEDO)

  13. The Dwarf Project: Vidojevica

    Science.gov (United States)

    Vince, O.

    2013-05-01

    The DWARF project is an important international project for observing eclipsing binary stars and searching for third companion which orbit around both stars. Recently, a group of researchers at the Astronomical Observatory of Belgrade joined this project using the 60 cm telescope at the Astronomical Station Vidojevica for observations. All the equipment and the human potential involved with this project from Serbia will be described in this paper.

  14. Process-based project proposal risk management

    Directory of Open Access Journals (Sweden)

    Alok Kumar

    2016-12-01

    Full Text Available We all are aware of the organizational omnipresence. Projects within the organizations are ubiquitous too. Projects achieve their goals successfully if they are planned, scheduled, controlled and implemented well. The project lifecycle of initiating, planning, scheduling, controlling and implementing are very well-planned by project managers and the organizations. Successful projects have well-developed risk management plans to deal with situations impacting projects. Like any other organisation, a university does try to access funds for different purposes too. For such organisations, running a project is not the issue, rather getting a project proposal approved to fund a project is the key. Project proposal processing is done by the nodal office in every organisation. Usually, these nodal offices help in administration and submission of a project proposal for accessing funds. Seldom are these nodal project offices within the organizations facilitate a project proposal approval by proactively reaching out to the project managers. And as project managers prepare project proposals, little or no attention is made to prepare a project proposal risk plan so as to maximise project acquisition. Risk plans are submitted while preparing proposals but these risk plans cater to a requirement to address actual projects upon approval. Hence, a risk management plan for project proposal is either missing or very little effort is made to treat the risks inherent in project acquisition. This paper is an integral attempt to highlight the importance of risk treatment for project proposal stage as an extremely important step to preparing the risk management plan made for projects corresponding to their lifecycle phases. Several tools and techniques have been proposed in the paper to help and guide either the project owner (proposer or the main organisational unit responsible for project management. Development of tools and techniques to further enhance project

  15. Servant leadership behaviors of aerospace and defense project managers and their relation to project success

    Science.gov (United States)

    Dominik, Michael T.

    The success of a project is dependent in part on the skills, knowledge, and behavior of its leader, the project manager. Despite advances in project manager certifications and professional development, the aerospace and defense industry has continued to see highly visible and expensive project failures partially attributable to failures in leadership. Servant leadership is an emerging leadership theory whose practitioners embrace empowerment, authenticity, humility, accountability, forgiveness, courage, standing back, and stewardship, but has not yet been fully examined in the context of the project manager as leader. The objective of this study was to examine the relationship between servant leadership behaviors demonstrated by aerospace and defense project managers and the resulting success of their projects. Study participants were drawn from aerospace and defense oriented affinity groups from the LinkedInRTM social media web system. The participants rated their project managers using a 30-item servant leadership scale, and rated the success of their project using a 12-item project success scale. One hundred and fifteen valid responses were analyzed from 231 collected samples from persons who had worked for a project manager on an aerospace and defense project within the past year. The results of the study demonstrated statistically significant levels of positive correlation to project success for all eight servant leadership factors independently evaluated. Using multiple linear regression methods, the servant leadership factors of empowerment and authenticity were determined to be substantial and statistically significant predictors of project success. The study results established the potential application of servant leadership as a valid approach for improving outcomes of projects.

  16. Comprehensive assessment of the status scientific and technical projects using Technology Project Readiness Level

    Directory of Open Access Journals (Sweden)

    A. N. Petrov

    2016-01-01

    Full Text Available The balanced methodology for assessing the Technology Project Readiness Level for commercialization (TPRL is proposed. TPRL allows to determine the dynamics and balance of development projects that use the standardized approaches used in assessing the readiness of the technology. Validation of the methodology undertaken for the projects of Federal target programs “Research and development on priority directions of development of scientific-technological complex of Russia for 2007–2013” and “Research and development on priority directions of development of scientific-technological complex of Russia for 2014–2020”. The obtained results showed the possibility of application of the methodology for the evaluation of projects, improving efficiency of expert activity in the evaluation of projects, monitoring the status of individual project and group of projects (portfolio. The application of the methodology allowed us to improve the management of individual project and portfolio of projects.Methodology TPRL will allow the implementers, industry partners, investors, and innovative industrial companies to improve the efficiency of its activities.

  17. Project-Management Tools for Libraries: A Planning and Implementation Model Using Microsoft Project 2000

    OpenAIRE

    Ying Zhang; Corinne Bishop

    2005-01-01

    This paper discusses how Microsoft Project 2000 was utilized at the University of Central Florida Libraries to manage an e-reference implementation project. As libraries today adopt more information technologies, efficiently managing projects can be challenging. The authors’ experience in the implementation of QuestionPoint e-reference software in October 2003 is described. Their conclusion illustrates that project-management tools, such as Microsoft Project 2000, offer practical workflow-man...

  18. The Impact of Project Manager on Project Success – The Case of ICT Sector

    OpenAIRE

    Blaskovics, Bálint

    2016-01-01

    The project management literature on project success is rich. Numerous papers focus on the evolution of the understanding of project success, identification of success criteria and critical success factors. Critical success factors increase the potential for achieving project success, while project success can be evaluated with the help of success criteria. Although the interrelationships between critical success factors and success criteria are rarely analyzed, yet there is a strong demand f...

  19. Projective relativity, cosmology and gravitation

    International Nuclear Information System (INIS)

    Arcidiacono, G.

    1986-01-01

    This book describes the latest applications of projective geometry to cosmology and gravitation. The contents of the book are; the Poincare group and Special Relativity, the thermodynamics and electromagnetism, general relativity, gravitation and cosmology, group theory and models of universe, the special projective relativity, the Fantappie group and Big-Bang cosmology, a new cosmological projective mechanics, the plasma physics and cosmology, the projective magnetohydrodynamics field, projective relativity and waves propagation, the generalizations of the gravitational field, the general projective relativity, the projective gravitational field, the De Sitter Universe and quantum physics, the conformal relativity and Newton gravitation

  20. Improving Project Manufacturing Coordination

    Directory of Open Access Journals (Sweden)

    Korpivaara Ville

    2014-09-01

    Full Text Available The objective of this research is to develop firms’ project manufacturing coordination. The development will be made by centralizing the manufacturing information flows in one system. To be able to centralize information, a deep user need assessment is required. After user needs have been identified, the existing system will be developed to match these needs. The theoretical background is achieved through exploring the literature of project manufacturing, development project success factors and different frameworks and tools for development project execution. The focus of this research is rather in customer need assessment than in system’s technical expertise. To ensure the deep understanding of customer needs this study is executed by action research method. As a result of this research the information system for project manufacturing coordination was developed to respond revealed needs of the stakeholders. The new system improves the quality of the manufacturing information, eliminates waste in manufacturing coordination processes and offers a better visibility to the project manufacturing. Hence it provides a solid base for the further development of project manufacturing.

  1. Financing of Chamera project

    International Nuclear Information System (INIS)

    Jain, A.K.; Chakraborty, D.K.

    1994-01-01

    Chamera Hydroelectric Project was selected by National Hydroelectric Power Corporation (NHPC) as a pilot project for accelerated development of hydro-power in the country. This project was considered to have certain distinct specialties from different aspects in comparison with other projects. In the first place, the field investigation for the project was completed in a record time of only eight months by deploying the most modern techniques. Secondly, Chamera was the first NHPC project with external aid both technically and financially. The third and most important of all the specialties was in the planned reduction of construction period to 6 years from the original estimate of 8 years. Such reduction of gestation period was considered to be the direct outcome of modern method of management, monitoring and improved imported technology. The investment decision in the project was taken in April '84 with an estimated cost of energy at busbar 44.12 paise/unit exclusive of return on equity capital and royalty payable to the home state. The all inclusive rate of power was estimated 75.86 paise/unit. (author). 4 tabs

  2. SDN Project

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Rhett [Schweitzer Engineering Laboratories Inc, Pullman, WA (United States)

    2016-12-23

    The SDN Project completed on time and on budget and successfully accomplished 100% of the scope of work outlined in the original Statement of Project Objective (SOPO). The SDN Project formed an alliance between Ameren Corporation, University of Illinois Urbana- Champaign (UIUC), Pacific Northwest National Laboratories (PNNL), and Schweitzer Engineering Laboratories, Inc. (SEL). The objective of the SDN Project is to address Topic Area of Interest 2: Sustain critical energy delivery functions while responding to a cyber-intrusion under Funding Opportunity Announcement DE-FOA-0000797. The goal of the project is to design and commercially release technology that provides a method to sustain critical energy delivery functions during a cyber intrusion and to do this control system operators need the ability to quickly identify and isolate the affected network areas, and re-route critical information and control flows around. The objective of the SDN Project is to develop a Flow Controller that monitors, configures, and maintains the safe, reliable network traffic flows of all the local area networks (LANs) on a control system in the Energy sector. The SDN team identified the core attributes of a control system and produced an SDN flow controller that has the same core attributes enabling networks to be designed, configured and deployed that maximize the whitelisted, deny-bydefault and purpose built networks. This project researched, developed and commercially released technology that: Enables all field networks be to configured and monitored as if they are a single asset to be protected; Enables greatly improved and even precalculated response actions to reliability and cyber events; Supports pre-configured localized response actions tailored to provide resilience against failures and centralized response to cyber-attacks that improve network reliability and availability; Architecturally enables the right subject matter experts, who are usually the information

  3. Tank waste remediation system privatization Phase 1 infrastructure, project W-519, project execution plan

    International Nuclear Information System (INIS)

    Parazin, R.J.

    1998-01-01

    This Project Execution Plan (PEP) defines the overall strategy, objectives, and contractor management requirements for the execution phase of Project W-519 (98-D403), Privatization Phase 1 Infrastructure Support, whose mission is to effect the required Hanford site infrastructure physical changes to accommodate the Privatization Contractor facilities. This plan provides the project scope, project objectives and method of performing the work scope and achieving objectives. The plan establishes the work definitions, the cost goals, schedule constraints and roles and responsibilities for project execution. The plan also defines how the project will be controlled and documented

  4. Photovoltaic Programme, Edition 2006. Summary report. Project list. Annual project reports 2005 (abstracts)

    Energy Technology Data Exchange (ETDEWEB)

    Nowak, S.

    2006-07-01

    This comprehensive, illustrated report for the Swiss Federal Office of Energy (SFOE) presents an overview of the work done as part of the 2005 research programme, along with the abstracts of the annual reports of the project leaders on research projects. It presents the programme's main points of focus, discusses the work done and the results obtained. Areas covered include cell technology (13 reports), solar modules and building integration (3 reports) , system technology (4 reports) as well as various further projects (5) that are connected with photovoltaics. Four further reports concern international co-operation. Further, several pilot and demonstration (P+D) projects are discussed. Lists of all research and development projects and pilot and demonstration projects are supplied. Work done at several institutions in Switzerland and at leading commercial companies is described.

  5. Isotopes Project

    International Nuclear Information System (INIS)

    Dairiki, J.M.; Browne, E.; Firestone, R.B.; Lederer, C.M.; Shirley, V.S.

    1984-01-01

    The Isotopes Project compiles and evaluates nuclear structure and decay data and disseminates these data to the scientific community. From 1940-1978 the Project had as its main objective the production of the Table of Isotopes. Since publication of the seventh (and last) edition in 1978, the group now coordinates its nuclear data evaluation efforts with those of other data centers via national and international nuclear data networks. The group is currently responsible for the evaluation of mass chains A = 167-194. All evaluated data are entered into the International Evaluated Nuclear Structure Data File (ENSDF) and are published in Nuclear Data Sheets. In addition to the evaluation effort, the Isotopes Project is responsible for production of the Radioactivity Handbook

  6. Guidelines for Automation Project Execution

    OpenAIRE

    Takkinen, Heidi

    2011-01-01

    The purpose of this Master’s thesis was to create instructions for executing an automation project. Sarlin Oy Ab needed directions on how to execute an automation project. Sarlin is starting up a new business area offering total project solutions for customers. Sarlin focuses on small and minor automation projects on domestic markets. The thesis represents issues related to project execution starting from the theory of the project to its kick-off and termination. Site work is one importan...

  7. The Role of the Project Management Office on Information Technology Project Success

    Science.gov (United States)

    Stewart, Jacob S.

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. Assessing critical success factors is another…

  8. Project evaluation: main characteristics

    OpenAIRE

    Moutinho, Nuno

    2010-01-01

    — The evaluation process of real investment projects must consider not only the traditional financial approach, but also non-financial aspects. Non financial analysis can provide additional relevant information about projects. We investigate financial and non-financial areas most relevant in project appraisal. We present main critical success factors and areas of analysis that lead to the perception of project success. Finally, companies are segmented to verify its financial and non-financial...

  9. Draft project management update to the Iowa DOT Project Development Manual : final report.

    Science.gov (United States)

    2016-08-01

    This work supported drafting project management guidance for the Iowa Department of Transportation (DOT). The goal is to : incorporate a greater focus on project management in their project development process. : A technical advisory committee (TAC) ...

  10. Richland Environmental Restoration Project Baseline Multi Year Work Plan Volume 1 Richland Environmental Restoration Project Plan

    International Nuclear Information System (INIS)

    Wintczak, T.M.

    2001-01-01

    The purpose of this project specification is to provide an overall scoping and document for the Environmental Restoration project, and to provide a link between the overall Hanford Site scope and the ER project. The purpose of this project specification is to provide an overall scoping document for the ER Project, and to provide a link between the overall Hanford Site scope and the ER Project. Additionally, this specification provides an integrated and consolidated source of information for the Richland ER Project. It identifies the ER Project vision, mission, and goals, as well as the operational history of the Hanford Site, along with environmental setting and hazards. This ER Project Specification is part of the overall ER Project baseline

  11. I-15 North Project

    Science.gov (United States)

    2013-11-05

    Goals of this project were as follows: (1) Conduct a comprehensive evaluation study on Nevada's I-15 North Design Build Project; (2) Analyze project implementation with respect to construction zone rules by which the contractor had to abide; (3) Anal...

  12. Fitting the project into the environment : Gulf Heavy Oil Red Cross Projects

    International Nuclear Information System (INIS)

    Sakires, D.G.; Johannesen, D.V.

    1998-01-01

    A reservoir delineation project by Gulf Canada's Heavy Oil Division was reviewed. The six well drilling program was completed in 1997 with minimal negative environmental impacts. The program, dubbed the Red Cross project, took place in the Northern Boreal Forest of Saskatchewan. Its success is attributed to the early involvement of the regulatory agencies in Saskatchewan, on-site environmental investigations, the development of an environmental protection plan, conscientious construction practices, a monitoring program during construction, and a pro-active reclamation plan. The project area is identified as being environmentally sensitive and important as a wildlife habitat area. This successful project demonstrated the usefulness of pre-project planning and team work between industry and the regulators. Details of the planning, construction and planned remedial reclamation actions are described. 11 refs., 2 tabs

  13. The ARCHER Project

    International Nuclear Information System (INIS)

    Knol, S.; Roelofs, F.; Fütterer, M.A.; Kohtz, N.; Laurie, M.; Buckthorpe, D.; Scheuermann, W.

    2014-01-01

    The European HTR R&D project ARCHER (Advanced High-Temperature Reactors for Cogeneration of Heat and Electricity R&D) builds on a solid HTR technology foundation in Europe, established through former national UK and German HTR programs and in European programs. ARCHER runs from 2011 to 2015 and targets selected HTR R&D subjects that would specifically support demonstration, with a focus on experimental effort. In line with the R&D and deployment strategy of the European Sustainable Nuclear Energy Technology Platform (SNETP) ARCHER contributes to maintaining, strengthening and expanding the HTR knowledge base in Europe to lay the foundations for demonstration of nuclear cogeneration with HTR systems. The project consortium encompasses conventional and nuclear industry, utilities, Technical Support Organizations, R&D organizations and academia. ARCHER shares results with international partners in the Generation IV International Forum and collaborates directly with related projects in the US, China, Japan, the Republic of Korea and South Africa. The ARCHER project is in its final year, and the paper comprises an overview of the achievements thus far for the different Sub Projects. (author)

  14. Project management process.

    Science.gov (United States)

    2007-03-01

    This course provides INDOT staff with foundational knowledge and skills in project management principles and methodologies. INDOTs project management processes provide the tools for interdisciplinary teams to efficiently and effectively deliver pr...

  15. "Cheesy Pizza": The Pizza Project

    Science.gov (United States)

    Gallick, Barbara; Lee, Lisa

    2009-01-01

    A class of 3- to 5-year-old children in a midwestern child care center chose to study pizza restaurants as a group project. This article discusses how the project evolved, describes the three phases of the project, and provides the teachers' reflections on the project. Photos taken during the project and children's sketches are included. (Contains…

  16. Management of research and development project

    International Nuclear Information System (INIS)

    Go, Seok Hwa; Hong Jeong Yu; Hyun, Byeong Hwan

    2010-12-01

    This book introduces summary on management of research and development project, prepare of research and development with investigation and analysis of paper, patent and trend of technology, structure of project, management model, management of project, management of project range, management of project time, management of project cost, management of project goods, management of project manpower, management of communication, management of project risk, management of project supply, management of outcome of R and D, management of apply and enroll of patent and management of technology transfer.

  17. Waste Management Project Contingency Analysis

    International Nuclear Information System (INIS)

    Edward L. Parsons, Jr.

    1999-01-01

    The purpose of this report is to provide the office of Waste Management (WM) with recommended contingency calculation procedures for typical WM projects. Typical projects were defined as conventional construction-type activities that use innovative elements when necessary to meet the project objectives. Projects involve treatment, storage, and disposal of low level, mixed low level, hazardous, transuranic, and high level waste. Cost contingencies are an essential part of Total Cost Management. A contingency is an amount added to a cost estimate to compensate for unexpected expenses resulting from incomplete design, unforeseen and unpredictable conditions, or uncertainties in the project scope (DOE 1994, AACE 1998). Contingency allowances are expressed as percentages of estimated cost and improve cost estimates by accounting for uncertainties. The contingency allowance is large at the beginning of a project because there are more uncertainties, but as a project develops, the allowance shrinks to adjust for costs already incurred. Ideally, the total estimated cost remains the same throughout a project. Project contingency reflects the degree of uncertainty caused by lack of project definition, and process contingency reflects the degree of uncertainty caused by use of new technology. Different cost estimation methods were reviewed and compared with respect to terminology, accuracy, and Cost Guide standards. The Association for the Advancement of Cost Engineering (AACE) methods for cost estimation were selected to represent best industry practice. AACE methodology for contingency analysis can be readily applied to WM Projects, accounts for uncertainties associated with different stages of a project, and considers both project and process contingencies and the stage of technical readiness. As recommended, AACE contingency allowances taper off linearly as a project nears completion

  18. Project management v praxi

    OpenAIRE

    Králová, Eliška

    2013-01-01

    Project management approaches are commonly used to write and implement business plans. In this thesis standard project management tools and methods are applied to a real project, which aims to improve the properties of the product it offers (an online educational game). This project is unique in that it is based on a voluntary basis, has limited resources and is very responsive to market demands. Project management is broken down into four stages according to the project life cycle: initiatio...

  19. Joint research achievement report on field test project for photovoltaic power generation of industrial use in fiscal 2000; 1999 nendo sangyo tou you taiyokohatsuden field test jigyo kyodo kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-05-01

    This paper summarizes the achievements in fiscal 2000 on the field tests for photovoltaic power generation of industrial use. This report describes the details of the achievements of the field tests in 36 locations including the following organizations: the Japan Industrial University, a school juristic person; the Harukawa Gakusha, a school juristic person; the Snow Brand Dairy; the Sony Chemicals; the West Japan Passenger Railways; the Hokushin Welfare Society, a social welfare juristic person; the Seikyou Gakuen, a school juristic person; the Miko Corporation; the Akashi Apparel Corporation; Shigenobu Township in Ehime Prefecture; the Japan Ham; the Seiko Epson; Henri Charpantier Corporation; the Joyo Gakuen, a school juristic person; Matsushita Electric Industry; Nio Township in Kagawa Prefecture; Matsumae Township in Ehime Prefecture; Nakajima Township in Ehime Prefecture; Sugo Gakuen, a school juristic person; the East Japan East Japan Passenger Railways (General Training Center); Shizuoka Automobile Gakuen, a school juristic person; Tomiyama Village in Aichi Prefecture; Futamura Grinding Industry; Toba City in Mie Prefecture; Higashi-ura Township in Hyogo Prefecture, Taisho Township in Kochi Prefecture; the Nagasaki Branch Office of the West Japan Telegraph and Telephone Company; Ashikita Township in Kumamoto Prefecture; the Miyazaki Branch Office of the West Japan Telegraph and Telephone Company; Oi Township in Fukui Prefecture; the Keishin Society, a social welfare juristic person; the Azabu Veterinarian School, a school juristic person, Omiya Township in Ibaraki Prefecture; and the Showa Electric Machinery. (NEDO)

  20. Rethinking Project Management in Denmark

    DEFF Research Database (Denmark)

    Svejvig, Per

    2012-01-01

    . The chapter argues for a rethinking process due to pervasiveness and complexity in the contemporary project environment where rethinking is needed in order to stay competitive. The suggested approach for the rethinking project management is a framing process where body of ideas is established......Projects are everywhere across different sectors, industries and countries. Project management is no longer a sub-discipline of engineering and other rather technical disciplines but is also used for many other purposes. Even though practice has changed dramatically over the years, the models...... and methodologies for project management has been fairly static and has therefore received substantial criticism for a lack of relevance to practice. Several scholars have therefore started to think more widely about projects and project management conceptualized as rethinking project management. However this theme...

  1. Nuclear safety projects 1995

    International Nuclear Information System (INIS)

    Carl-Erik Christoffersen

    1996-01-01

    Action plans for the prevention of contamination in the Arctic regions is concretized in a number of international projects. The Norwegian Radiation Protection Authority is responsible for the follow-up of 13 projects. The report describes the development of these projects in 1995

  2. Project Management Performance Drivers

    OpenAIRE

    Ra’ad, Mohammed A.; Najdawi, Mohammad K.

    2010-01-01

    The practice of project management has gained enormous importance over the past several years in various business industries. “In industries as diverse as pharmaceuticals, software, and aerospace, projects drive business” (Wheatley). This gain of importance can be attributed to the magnitude of the impact project performance results in terms of time, cost, and scope have over the project performing entity. “On the basis of data released by the Bureau of Economic Analysis, part of the US De...

  3. Project management practice and its effects on project success in Malaysian construction industry

    Science.gov (United States)

    Haron, N. A.; Devi, P.; Hassim, S.; Alias, A. H.; Tahir, M. M.; Harun, A. N.

    2017-12-01

    The rapid economic development has increased the demand for construction of infrastructure and facilities globally. Sustainable development and globalization are the new ‘Zeitgeist’ of the 21st century. In order to implement these projects successfully and to meet the functional aim of the projects within their lifetime, an efficient project management practice is needed. The aim of this study is to identify the critical success factors (CSFs) and the extent of use of project management practice which affects project success, especially during the implementation stage. Data were obtained from self-administered questionnaires with 232 respondents. A mixed method of data collection was adopted using semi-structured interview and questionnaire approach. The result of the analysis of data obtained showed that new and emerging criteria such as customer satisfaction, competency of the project team, and performance of subcontractors/suppliers are becoming measures of success in addition to the classic iron triangle’s view of time, cost and quality. An insight on the extent of use of different project management practice in the industry was also achieved from the study.

  4. A desk evaluation review of project URT/5/007 tsetse fly eradication. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-06-01

    Project URT/5/007 was initiated in 1984 to assist the Government of the United Republic of Tanzania in developing membrane feeding technology for the mass breeding of tsetse flies, which is required for the application of the sterile insect technique to eradicate the tsetse fly from the island of Zanzibar. As the project progressed the objectives focused on the development of inter-related management practices with SIT to control and eventually eradicate the tsetse species infesting Zanzibar. As depicted by the project title, tsetse fly eradication on Zanzibar is the ultimate goal of on-going work of project URT/5/007; however, tsetse fly eradication is not the immediate objective of this project. The total budget of the project for the years 1984 through 1994 includes 53 man-months of expert services, $402,755 for equipment, and $1,959 for fellowship training. Additional funds for 57 man-months of fellowship training were provided from sources outside of the project. Resources provided by the United Republic of Tanzania for the project included staff, local facilities, and local running costs. A Desk Evaluation Review (DER) of Project URT/5/007 was requested by the Africa Section to provide an assessment of project achievements and to determine to what end the project may lead in the near future. Also the review could help determine how experiences gained during the developments of this project might be utilized in the management and implementation of similar projects in Tanzania or the region.

  5. A desk evaluation review of project URT/5/007 tsetse fly eradication. Project desk evaluation

    International Nuclear Information System (INIS)

    1993-01-01

    Project URT/5/007 was initiated in 1984 to assist the Government of the United Republic of Tanzania in developing membrane feeding technology for the mass breeding of tsetse flies, which is required for the application of the sterile insect technique to eradicate the tsetse fly from the island of Zanzibar. As the project progressed the objectives focused on the development of inter-related management practices with SIT to control and eventually eradicate the tsetse species infesting Zanzibar. As depicted by the project title, tsetse fly eradication on Zanzibar is the ultimate goal of on-going work of project URT/5/007; however, tsetse fly eradication is not the immediate objective of this project. The total budget of the project for the years 1984 through 1994 includes 53 man-months of expert services, $402,755 for equipment, and $1,959 for fellowship training. Additional funds for 57 man-months of fellowship training were provided from sources outside of the project. Resources provided by the United Republic of Tanzania for the project included staff, local facilities, and local running costs. A Desk Evaluation Review (DER) of Project URT/5/007 was requested by the Africa Section to provide an assessment of project achievements and to determine to what end the project may lead in the near future. Also the review could help determine how experiences gained during the developments of this project might be utilized in the management and implementation of similar projects in Tanzania or the region

  6. Evaluation on Collaborative Satisfaction for Project Management Team in Integrated Project Delivery Mode

    Science.gov (United States)

    Zhang, L.; Li, Y.; Wu, Q.

    2013-05-01

    Integrated Project Delivery (IPD) is a newly-developed project delivery approach for construction projects, and the level of collaboration of project management team is crucial to the success of its implementation. Existing research has shown that collaborative satisfaction is one of the key indicators of team collaboration. By reviewing the literature on team collaborative satisfaction and taking into consideration the characteristics of IPD projects, this paper summarizes the factors that influence collaborative satisfaction of IPD project management team. Based on these factors, this research develops a fuzzy linguistic method to effectively evaluate the level of team collaborative satisfaction, in which the authors adopted the 2-tuple linguistic variables and 2-tuple linguistic hybrid average operators to enhance the objectivity and accuracy of the evaluation. The paper demonstrates the practicality and effectiveness of the method through carrying out a case study with the method.

  7. How Project Managers Really Manage: An Indepth Look at Some Managers of Large, Complex NASA Projects

    Science.gov (United States)

    Mulenburg, Gerald M.; Impaeilla, Cliff (Technical Monitor)

    2000-01-01

    This paper reports on a research study by the author that examined ten contemporary National Aeronautics and Space Administration (NASA) complex projects. In-depth interviews with the project managers of these projects provided qualitative data about the inner workings of the project and the methodologies used in establishing and managing the projects. The inclusion of a variety of space, aeronautics, and ground based projects from several different NASA research centers helped to reduce potential bias in the findings toward any one type of project, or technical discipline. The findings address the participants and their individual approaches. The discussion includes possible implications for project managers of other large, complex, projects.

  8. The Alzheimer's Project

    Science.gov (United States)

    ... Navigation Bar Home Current Issue Past Issues The Alzheimer's Project Past Issues / Spring 2009 Table of Contents ... of this page please turn Javascript on. The Alzheimer's Project A 4-Part Documentary Series Starting May ...

  9. Managing projects a team-based approach

    CERN Document Server

    Brown, Karen A

    2010-01-01

    Students today are likely to be assigned to project teams or to be project managers almost immediately in their first job. Managing Projects: A Team-Based Approach was written for a wide range of stakeholders, including project managers, project team members, support personnel, functional mangers who provide resources for projects, project customers (and customer representatives), project sponsors, project subcontractors, and anyone who plays a role in the project delivery process. The need for project management is on the rise as product life cycles compress, demand for IT systems increases, and business takes on an increasingly global character. This book adds to the project management knowledge base in a way that fills an unmet need—it shows how teams can apply many of the standard project management tools, as well as several tools that are relatively new to the field. Managing Projects: A Team-Based Approach offers the academic rigor found in most textbooks along with the practical attributes often foun...

  10. Project Management with IT Security Focus

    OpenAIRE

    Felician Alecu; Paul Pocatilu; Sergiu Capisizu

    2011-01-01

    The paper focus on the main key points related to the IT security project management. The most important lifecycle stages are identified: IT security project proposal definition, project organization, project planning, quality planning, project team organization, IT security project activities management and project closing. The most important success factors for IT security projects are the support of top-management, customer satisfaction, prevention over remediation and continuous progress....

  11. INDICATIVE MODEL OF DEVIATIONS IN PROJECT

    Directory of Open Access Journals (Sweden)

    Олена Борисівна ДАНЧЕНКО

    2016-02-01

    Full Text Available The article shows the process of constructing the project deviations indicator model. It based on a conceptual model of project deviations integrated management (PDIM. During the project different causes (such as risks, changes, problems, crises, conflicts, stress lead to deviations of integrated project indicators - time, cost, quality, and content. For a more detailed definition of where in the project deviations occur and how they are dangerous for the whole project, it needs to develop an indicative model of project deviations. It allows identifying the most dangerous deviations that require PDIM. As a basis for evaluation of project's success has been taken famous model IPMA Delta. During the evaluation, IPMA Delta estimated project management competence of organization in three modules: I-Module ("Individuals" - a self-assessment personnel, P-module ("Projects" - self-assessment of projects and/or programs, and O-module ("Organization" - used to conduct interviews with selected people during auditing company. In the process of building an indicative model of deviations in the project, the first step is the assessment of project management in the organization by IPMA Delta. In the future, built cognitive map and matrix of system interconnections of the project, which conducted simulations and built a scale of deviations for the selected project. They determined a size and place of deviations. To identify the detailed causes of deviations in the project management has been proposed to use the extended system of indicators, which is based on indicators of project management model Project Excellence. The proposed indicative model of deviations in projects allows to estimate the size of variation and more accurately identify the place of negative deviations in the project and provides the project manager information for operational decision making for the management of deviations in the implementation of the project

  12. DIPLOMA PROJECT TEAM WORK MANAGEMENT

    Directory of Open Access Journals (Sweden)

    V. S. Kruglyk

    2014-04-01

    Full Text Available During the work performance students should get the maximal approach to the process of real project execution, so the project should include the need to use the latest technology, integration of data or services with different developments, architecture design, interaction of the team members and others. Implementation of graduation projects is the useful activity for the acquisition and consolidation of key IT competencies. Since the task of educational projects is maximal close to real one, students participate almost in all typical stages of commercial product’s development, and do so successfully. This is also confirmed practically: students, who were actively engaged in some projects at the university, have key positions in IT companies of the city and country after that. The main objective of the paper is to describe the organization of a common group students’ work on a degree project, implementation peculiarity of such projects, recommendations for improving the quality of projects. Thus, the paper is devoted to the peculiarities of the joint students’ work on a project during diploma execution in IT specialties, as the final part of the acquisition and consolidation process of key IT competencies of future programmers. The problem of choosing work topic, project concept, work organization in a group, implementation process organization has been considered. Also the specific stages of software development have been considered: development of interface, choice of technology, product quality, project disposal to the next developers, project completion.

  13. Pingston hydroelectric project - stage 2 project report : volume 1 of 2

    International Nuclear Information System (INIS)

    1999-01-01

    The British Columbia Environmental Assessment Office has reviewed an application by Canadian Hydro Developers (B.C.) Inc., to develop the Pingston Hydroelectric Project, a run-of-river facility, located 60 km south of Revelstoke, British Columbia. The review includes an evaluation of any social and environmental impacts, including the effects on migratory birds, small mammals, amphibians, fish, wildlife, water quality, noise and visual aspects, that would be associated with the project. One consideration in selecting the project site was its ease of access along existing roadways and close proximity to power lines, another, the absence of any potential effects on fish and fish habitat. The project is also expected to have a negligible effect on water quality- related matters such as sediment transport, nutrient trapping in the headpond, and movement of large organic debris through the system. The project will not impact on archaeological resources, offers a renewable supply of energy and represents an overall positive effect on air quality for British Columbia. BC Hydro has committed to providing electrical interconnection to the main grid. 9 refs., 5 tabs., 14 figs., 9 appendices

  14. Assessment of Project Website Sustainability: Case of the Arctic EIA Project

    Directory of Open Access Journals (Sweden)

    Sonja H Bickford

    2016-07-01

    Full Text Available In many cases, temporary websites may be simple, accessible solutions for knowledge management and dissemination of information. However, such sites may become outdated as the funding ends, but yet in many cases, still publicly available through the Internet. The issue of website sustainability is a relevant topic for all organizations that have websites. Website lifecycle, knowledge management, and website sustainability issues are discussed through a theoretical-based literature review. These issues are then summarized and used as lessons learned for the case study approach of this paper. The aim is to identify a solution to address a website’s life and longevity, post project. A practical case study assessment of the issue of project website sustainability is needed to address the website’s longevity—post project—as creation is often made through temporary endeavors. Recommendations for future project websites are made as the outcomes and results of this study and are expressed in the form of suggested practices for project website sustainability in future projects.

  15. Projected coupled cluster theory.

    Science.gov (United States)

    Qiu, Yiheng; Henderson, Thomas M; Zhao, Jinmo; Scuseria, Gustavo E

    2017-08-14

    Coupled cluster theory is the method of choice for weakly correlated systems. But in the strongly correlated regime, it faces a symmetry dilemma, where it either completely fails to describe the system or has to artificially break certain symmetries. On the other hand, projected Hartree-Fock theory captures the essential physics of many kinds of strong correlations via symmetry breaking and restoration. In this work, we combine and try to retain the merits of these two methods by applying symmetry projection to broken symmetry coupled cluster wave functions. The non-orthogonal nature of states resulting from the application of symmetry projection operators furnishes particle-hole excitations to all orders, thus creating an obstacle for the exact evaluation of overlaps. Here we provide a solution via a disentanglement framework theory that can be approximated rigorously and systematically. Results of projected coupled cluster theory are presented for molecules and the Hubbard model, showing that spin projection significantly improves unrestricted coupled cluster theory while restoring good quantum numbers. The energy of projected coupled cluster theory reduces to the unprojected one in the thermodynamic limit, albeit at a much slower rate than projected Hartree-Fock.

  16. Microsoft Project 2010 The Missing Manual

    CERN Document Server

    Biafore, Bonnie

    2010-01-01

    Microsoft Project is brimming with features to help you manage any project, large or small. But learning the software is only half the battle. What you really need is real-world guidance: how to prep your project before touching your PC, which Project tools work best, and which ones to use with care. This book explains it all, helping you go from project manager to project master. Get a project management primer. Discover what it takes to handle a project successfullyLearn the program inside out. Get step-by-step instructions for Project Standard and Project ProfessionalBuild and refine your

  17. Managing clinical improvement projects.

    Science.gov (United States)

    Phillips, Joanna; Simmonds, Lorraine

    This paper, the second of a three-part series looking at change management tools, provides a practical guide on how to use common project management principles in practice. Much of the literature on project management focuses on the business arena, with little reference to clinical settings. Identifying this literature and understanding its relevance to managing projects in healthcare can be difficult. This article provides a practical guide to identifying the key principles of good project management and applying these in health settings.

  18. Project financing renewable energy schemes

    International Nuclear Information System (INIS)

    Brandler, A.

    1993-01-01

    The viability of many Renewable Energy projects is critically dependent upon the ability of these projects to secure the necessary financing on acceptable terms. The principal objective of the study was to provide an overview to project developers of project financing techniques and the conditions under which project finance for Renewable Energy schemes could be raised, focussing on the potential sources of finance, the typical project financing structures that could be utilised for Renewable Energy schemes and the risk/return and security requirements of lenders, investors and other potential sources of financing. A second objective is to describe the appropriate strategy and tactics for developers to adopt in approaching the financing markets for such projects. (author)

  19. Reference projections for greenhouse gases in the Netherlands: emission projections for 2001 - 2010

    NARCIS (Netherlands)

    Wijngaarden R van den; Ybema JR; Gijsen A; Oude Lohuis JA; Thomas R; Daniels B; Dril AWN van; Volkers CH; Energieonderzoek Centrum; LAE

    2002-01-01

    The results are presented of the project 'reference projection for energy and greenhouse gases' carried out by RIVM and ECN for the Ministries of Housing, Spatial Planning and the Environment, and of Economic Affairs. The reference projection considers emission of greenhouse gases in

  20. IX Disposition Project - project management plan

    International Nuclear Information System (INIS)

    Choi, I.G.

    1994-01-01

    This report presents plans for resolving saving and disposal concerns for ion exchange modules, cartridge filters and columns. This plan also documents the project baselines for schedules, cost, and technical information

  1. Battleground Energy Recovery Project

    Energy Technology Data Exchange (ETDEWEB)

    Bullock, Daniel [USDOE Gulf Coast Clean Energy Application Center, Woodlands, TX (United States)

    2011-12-31

    In October 2009, the project partners began a 36-month effort to develop an innovative, commercial-scale demonstration project incorporating state-of-the-art waste heat recovery technology at Clean Harbors, Inc., a large hazardous waste incinerator site located in Deer Park, Texas. With financial support provided by the U.S. Department of Energy, the Battleground Energy Recovery Project was launched to advance waste heat recovery solutions into the hazardous waste incineration market, an area that has seen little adoption of heat recovery in the United States. The goal of the project was to accelerate the use of energy-efficient, waste heat recovery technology as an alternative means to produce steam for industrial processes. The project had three main engineering and business objectives: Prove Feasibility of Waste Heat Recovery Technology at a Hazardous Waste Incinerator Complex; Provide Low-cost Steam to a Major Polypropylene Plant Using Waste Heat; and Create a Showcase Waste Heat Recovery Demonstration Project.

  2. Theory of Abelian projection

    International Nuclear Information System (INIS)

    Ogilvie, M.C.

    1999-01-01

    Analytic methods for Abelian projection are developed. A number of results are obtained related to string tension measurements. It is proven that even without gauge fixing, Abelian projection yields string tensions of the underlying non-Abelian theory. Strong arguments are given for similar results in the case where gauge fixing is employed. The methods used emphasize that the projected theory is derived from the underlying non-Abelian theory rather than vice versa. In general, the choice of subgroup used for projection is not very important, and need not be Abelian. While gauge fixing is shown to be in principle unnecessary for the success of Abelian projection, it is computationally advantageous for the same reasons that improved operators, e.g., the use of fat links, are advantageous in Wilson loop measurements. Two other issues, Casimir scaling and the conflict between projection and critical universality, are also discussed. copyright 1999 The American Physical Society

  3. Managing a sensitive project

    International Nuclear Information System (INIS)

    Etcheber, Pascal

    1998-01-01

    A 'sensitive' project needs to be managed differently from a 'normal' project. This statement might seem simple enough. However, it does not seem to be a simple task to prove it in twenty minutes. This paper is an attempt to share with the audience some of the experiences the company had dealing with sensitive projects. It describes what a sensitive project is, though of all people, the 'nuclear' should know. Then the common mistakes are described, that are made in the hoping that some personal experiences are recognised. Finally the company's strategy is shown, how we foster third party support and the main tools to be used. Ultimately, success is ensured by having a sufficient quantity of allies. A sensitive project does not die because it has too many opponents, but because it has too few allies. Finding and helping allies to act is the thrust of our activity. It enables sensitive projects which deserve to succeed to do so, where traditional management fails miserably

  4. Project Investment and Project Financing: A study on Business Case and Financing Models

    OpenAIRE

    Wang, Simiao

    2012-01-01

    Uncertainty is a very significant factor that must be taken into consideration in project front-end phase management. By taking into uncertainty, the planners can to a great extent make sure that the business case could be accurate between specific intervals, hence business case can be based on to make decision. In a highly uncertain environment; the project sponsors should prefer other means to finance the project rather than using debt. Risk management is extremely important in project fina...

  5. Managing a big ground-based astronomy project: the Thirty Meter Telescope (TMT) project

    Science.gov (United States)

    Sanders, Gary H.

    2008-07-01

    TMT is a big science project and its scale is greater than previous ground-based optical/infrared telescope projects. This paper will describe the ideal "linear" project and how the TMT project departs from that ideal. The paper will describe the needed adaptations to successfully manage real world complexities. The progression from science requirements to a reference design, the development of a product-oriented Work Breakdown Structure (WBS) and an organization that parallels the WBS, the implementation of system engineering, requirements definition and the progression through Conceptual Design to Preliminary Design will be summarized. The development of a detailed cost estimate structured by the WBS, and the methodology of risk analysis to estimate contingency fund requirements will be summarized. Designing the project schedule defines the construction plan and, together with the cost model, provides the basis for executing the project guided by an earned value performance measurement system.

  6. European Wind Farm Project Costs History and Projections 2008 Study

    Energy Technology Data Exchange (ETDEWEB)

    2008-10-15

    At the request of Enova (the 'Client'), Garrad Hassan and Partners Limited ('GH') has provided technical advice on capital cost expectations for wind farm developments. In summary, the work provides a survey of the present and future 5-year prognosis for costs and conditions facing developers and suppliers in the European wind power market. The report will be used as a benchmark to support tendering for future Norwegian projects. As such, it will also provide discussion of how project characteristics can influence project cost. Data Used in the Analysis GH has obtained data on the investment costs for 35 projects developed or in development in Europe. The projects represent to the extent possible the characteristics representative of potential Norwegian projects. The data used in this analysis are from actual projects in: France, Germany, Hungary, Ireland, Italy, Northern Ireland, Portugal, Scotland, Spain and Wales. The turbine capacities represented in the data are typically 2 MW or above, except in one case where a mix of turbines sizes was used at the project. GH highlights that because of high demand for turbines, the main manufacturers have recently been offering to meet delivery schedules for new orders from late 2010. For new tenders it is likely that delivery time frames offered will now be for 2011 deliveries. As a result of the current 'Seller's Market', production capacity typically relates directly to the number of turbines sold in the year; therefore for 2007 the annual production capacity was approximately 22 GW. GH is aware that turbine suppliers across the market are working to increase their production capacity in order to ease the pressure on the market, however, there are bottlenecks through the supply chain at the sub component level. As a result, increases in production capacity will likely remain at a relatively steady state in the short term. Energy Assessment The energy assessment of a project is the area

  7. Unicycle Project Report

    OpenAIRE

    Thomson, S

    2010-01-01

    The Unicycle project implemented an institutional Open Educational Resource repository with a view to ensuring sustainability in approach by embedding OER as an Assessment, Learning and Teaching strategy. This is the final submitted report for the project.

  8. El Paso County Geothermal Project at Fort Bliss. Final Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Lear, Jon [Ruby Mountain Inc., Salt Lake City, UT (United State); Bennett, Carlon [Ruby Mountain Inc., Salt Lake City, UT (United State); Lear, Dan [Ruby Mountain Inc., Salt Lake City, UT (United State); Jones, Phil L. [Ruby Mountain Inc., Salt Lake City, UT (United State); Burdge, Mark [Evergreen Clean Energy Management, Provo, UT (United States); Barker, Ben [Evergreen Clean Energy Management, Provo, UT (United States); Segall, Marylin [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Moore, Joseph [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Nash, Gregory [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Jones, Clay [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Simmons, Stuart [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Taylor, Nancy [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.

    2016-02-01

    The El Paso County Geothermal Project at Fort Bliss was an effort to determine the scale and scope of geothermal resources previously identified on Fort Bliss’ McGregor Range in southern Otero County, New Mexico. The project was funded with a $5,000,000 grant to El Paso County from the U.S. Department of Energy (DOE) as part of the American Recovery and Reinvestment Act of 2009 and a $4,812,500 match provided by private sector partners. The project was administered through the DOE Golden Field Office to awardee El Paso County. The primary subcontractor to El Paso County and project Principal Investigator - Ruby Mountain Inc. (RMI) of Salt Lake City, Utah - assembled the project team consisting of Evergreen Clean Energy Management (ECEM) of Provo, Utah, and the Energy & Geoscience Institute at the University of Utah (EGI) in Salt Lake City, UT to complete the final phases of the project. The project formally began in May of 2010 and consisted of two preliminary phases of data collection and evaluation which culminated in the identification of a drilling site for a Resource Confirmation Well on McGregor Range. Well RMI 56-5 was drilled May and June 2013 to a depth of 3,030 ft. below ground level. A string of slotted 7 inch casing was set in 8.75 inch hole on bottom fill at 3,017 ft. to complete the well. The well was drilled using a technique called flooded reverse circulation, which is most common in mineral exploration. This technique produced an exceptionally large and complete cuttings record. An exciting development at the conclusion of drilling was the suspected discovery of a formation that has proven to be of exceptionally high permeability in three desalinization wells six miles to the south. Following drilling and preliminary testing and analysis, the project team has determined that the McGregor Range thermal anomaly is large and can probably support development in the tens of megawatts.

  9. Project evaluation: one framework - four approaches

    DEFF Research Database (Denmark)

    Rode, Anna Le Gerstrøm; Svejvig, Per

    . Introducing a framework that can help structure such evaluations, the aim of this paper is to contribute to project theory and practice by inspiring project researchers and aiding project workers in their efforts to open up the black box of projects and deliver relevant and valuable results......There are many theoretical and practical reasons for evaluating projects – including explorative arguments focusing on expanding descriptive knowledge on projects as well as normative arguments focusing on developing prescriptive knowledge of project management. Despite the need for effective...... project management and research methods that can assess effective project management methodologies, extant literature on evaluation procedures or guidelines on how to evaluate projects and/or project management is scarce. To address this challenge, this paper introduces an evaluation framework consisting...

  10. Humane Education Projects Handbook.

    Science.gov (United States)

    Junior League of Ogden, UT.

    This handbook was developed to promote interest in humane education and to encourage the adoption of humane education projects. Although specifically designed to assist Junior Leagues in developing such projects, the content should prove valuable to animal welfare organizations, zoos, aquariums, nature centers, and other project-oriented groups…

  11. Severe fuel damage projects

    International Nuclear Information System (INIS)

    Sdouz, G.

    1987-10-01

    After the descriptions of the generation of a Severe Fuel Damage Accident in a LWR the hypothetical course of such an accident is explained. Then the most significant projects are described. At each project the experimental facility, the most important results and the concluding models and codes are discussed. The selection of the projects is concentrated on the German Projekt Nukleare Sicherheit (PNS), tests performed at the Idaho National Engineering Laboratory (INEL) and smaller projects in France and Great Britain. 25 refs., 26 figs. (Author)

  12. HERMES project management I

    CERN Multimedia

    CERN. Geneva

    2013-01-01

    A two-hours course on the HERMES Project Management Methodology to the attention of Project Leaders and Project Participants. The methodology is quickly presented; the focus is put on the roles and responsibilities and on the project initiation phase. The course is given in French with slides in English. On April 22nd 2013, a new version of the HERMES methodology was made public. For practical reasons, this course is still given based on the 2009 version of HERMES (a.k.a. HERMES 4).

  13. Solar renovation demonstration projects

    Energy Technology Data Exchange (ETDEWEB)

    Bruun Joergensen, O [ed.

    1998-10-01

    In the framework of the IEA SHC Programme, a Task on building renovation was initiated, `Task 20, Solar Energy in Building Renovation`. In a part of the task, Subtask C `Design of Solar Renovation Projects`, different solar renovation demonstration projects were developed. The objective of Subtask C was to demonstrate the application of advanced solar renovation concepts on real buildings. This report documents 16 different solar renovation demonstration projects including the design processes of the projects. The projects include the renovation of houses, schools, laboratories, and factories. Several solar techniques were used: building integrated solar collectors, glazed balconies, ventilated solar walls, transparent insulation, second skin facades, daylight elements and photovoltaic systems. These techniques are used in several simple as well as more complex system designs. (au)

  14. EDUCATIONAL PROJECTS STAKEHOLDER MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Юлія Юріївна ГУСЄВА

    2016-02-01

    Full Text Available An approach based on an integration of requirements breakdown structure and work breakdown structure of the project is proposed. It can complement existing methods of project stakeholders classification with the indicator of resource input, which can be defined in monetary terms. A method of requirements monitoring is proposed, which allows you to track the requirements of project stakeholders over time according to the actual amount of resources spent by analogy with the earned value method. Proposed indexes are the basis not only for monitoring but for the forecast of the project. The need of creating of a mechanism for getting baseline data taking into account the existence of different types of requirements of project stakeholders is grounded.

  15. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1987-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is a Department of Energy (DOE) designated Major System Acquisition (MSA). To execute and manage the Project mission successfully and to comply with the MSA requirements, the UMTRA Project Office (''Project Office'') has implemented and operates an Integrated Project Management System (IPMS). The Project Office is assisted by the Technical Assistance Contractor's (TAC) Project Integration and Control (PIC) Group in system operation. Each participant, in turn, provides critical input to system operation and reporting requirements. The IPMS provides a uniform structured approach for integrating the work of Project participants. It serves as a tool for planning and control, workload management, performance measurement, and specialized reporting within a standardized format. This system description presents the guidance for its operation. Appendices 1 and 2 contain definitions of commonly used terms and abbreviations and acronyms, respectively. 17 figs., 5 tabs

  16. Scheduling of resource-constrained projects

    CERN Document Server

    Klein, Robert

    2000-01-01

    Project management has become a widespread instrument enabling organizations to efficiently master the challenges of steadily shortening product life cycles, global markets and decreasing profit margins. With projects increasing in size and complexity, their planning and control represents one of the most crucial management tasks. This is especially true for scheduling, which is concerned with establishing execution dates for the sub-activities to be performed in order to complete the project. The ability to manage projects where resources must be allocated between concurrent projects or even sub-activities of a single project requires the use of commercial project management software packages. However, the results yielded by the solution procedures included are often rather unsatisfactory. Scheduling of Resource-Constrained Projects develops more efficient procedures, which can easily be integrated into software packages by incorporated programming languages, and thus should be of great interest for practiti...

  17. Increasing the Value of Research: A Comparison of the Literature on Critical Success Factors for Projects, IT Projects and Enterprise Resource Planning Projects

    Directory of Open Access Journals (Sweden)

    Annie Maddison Warren

    2016-11-01

    Full Text Available Since the beginning of modern project management in the 1960s, academic researchers have sought to identify a definitive list of Critical Success Factors (CSFs, the key things that project managers must get right in order to deliver a successful product. With the advent of Information Technology (IT projects and, more recently, projects to deliver Enterprise Resource Planning (ERP systems, attention has turned to identifying definitive lists of CSFs for these more specific project types. The purpose of this paper is to take stock of this research effort by examining how thinking about each type of project has evolved over time, before producing a consolidated list of CSFs for each as a basis for comparison. This process reveals a high degree of similarity, leading to the conclusion that the goal of identifying a generic list of CSFs for project management has been achieved. Therefore, rather than continuing to describe lists of CSFs, researchers could increase the value of their contribution by taking a step forward and focusing on why, despite this apparent knowledge of how to ensure their success, ERP projects continue to fail.

  18. How effective project management will add value to your uranium project

    International Nuclear Information System (INIS)

    Bradford, R.; Titley, M.

    2014-01-01

    Up until the recent Fukushima incident in March 2011 project activity in the uranium sector was driven by high uranium prices and merger and acquisition corporate activity. Soon after the incident, project development in the uranium sector collapsed and capital slowly dried up as Uranium prices dropped. New projects were put on hold, significantly reducing growth in the small to medium capital markets. Existing brownfield growth plans were halted as corporate strategies focused on improving the efficiency of existing assets. Recent positive sentiment supported by positive commentary in the uranium market, driven by an improved understanding of the supply and demand fundamentals and the restart of Japan’s nuclear reactors, has seen renewed corporate merger and acquisition activity. Developers are again taking an interest in new uranium project development.

  19. Number projection method

    International Nuclear Information System (INIS)

    Kaneko, K.

    1987-01-01

    A relationship between the number projection and the shell model methods is investigated in the case of a single-j shell. We can find a one-to-one correspondence between the number projected and the shell model states

  20. Building support for your wind project : engaging stakeholders : the Dillon Wind Project

    Energy Technology Data Exchange (ETDEWEB)

    Philpott, G. [PPM Energy, Calgary, AB (Canada)

    2007-07-01

    Iberdrola, the world's largest renewable energy company, acquired Scottish Power PLC and its subsidiary PPM Energy in April 2007. Iberdrola operates 6,500 MW of wind energy worldwide. This presentation described PPM Energy's experience with the proposed 45 MW Dillon Wind Project in southern California. The proposed project includes fourty-five 1 MW 327 ft tall Mitsubishi turbines as well as associated facilities such as turbine access roads, underground collector lines, and a collector substation. The wind turbine array occupies 2 per cent of 1500 acres. The vacant rural desert properties surrounding the proposed project area already house 2,700 existing turbines within San Gorgonio Pass, 513 existing turbines within 1/2 of the proposed project, and 2 sites of formerly hosted wind turbines. PPM held an open house for interested residents and stakeholders to learn about the Dillon project and express concerns. The meetings were attended by local wildlife agencies, homeowner groups, the Coachella Valley Economic Partnership and Palm Springs Economic Development Council. The project would help California meet its renewable energy mandates and serve 13,500 homes. It would eliminate 186 million pounds of carbon dioxide, 9.6 million pounds of sulfur dioxide and 5.8 million pounds of nitrous oxides each year. Lessons learned by PPM were: engage in community outreach; emphasize project benefits; build flexibility into design; and address real environmental concerns. In response to public concerns, PPM Energy eliminated 2 turbines from the project. In addition, turbines were shifted away from residences and a scenic highway. All collector lines were placed underground, without any overhead lines. figs.