WorldWideScience

Sample records for hud project selection

  1. HUD TRM Report

    Data.gov (United States)

    Department of Housing and Urban Development — HUD uses certain systems and software to conduct daily business. It is important for our project managers and contractors to know the different platforms and...

  2. 24 CFR 245.416 - Initial submission of materials to HUD: Conversion from project-paid utilities to tenant-paid...

    Science.gov (United States)

    2010-04-01

    ... projects, and utility rate information, as obtained from the utility supplier; (iv) The estimated monthly... HUD: Conversion from project-paid utilities to tenant-paid utilities or a reduction in tenant utility... AUTHORITIES TENANT PARTICIPATION IN MULTIFAMILY HOUSING PROJECTS Procedures for Requesting Approval of a...

  3. DOE-HUD Initiative on Energy Efficiency in Housing: A federal partnership. Program summary report

    Energy Technology Data Exchange (ETDEWEB)

    Brinch, J. [Energetics, Inc., Columbia, MD (United States)

    1996-06-01

    One of the primary goals of the US Department of Housing and urban Development (HUD) is the expansion of home ownership and affordable housing opportunities. Recognizing that energy efficiency is a key component in an affordable housing strategy, HUD and the US Department of Energy (DOE) created the DOE-HUD Initiative on Energy Efficiency in Housing. The DOE-HUD Initiative was designed to share the results of DOE research with housing providers throughout the nation, to reduce energy costs in federally-subsidized dwelling units and improve their affordability and comfort. This Program Summary Report provides an overview of the DOE-HUD Initiative and detailed project descriptions of the twenty-seven projects carried out with Initiative funding.

  4. HUD INFORMATION SYSTEMS: Immature Software Acquisition Capability Increases Project Risks

    National Research Council Canada - National Science Library

    2001-01-01

    .... GAO has designated HUD's major program areas as high risk, in part because the department's information and financial management systems were poorly integrated, ineffective, and generally unreliable...

  5. HUD Homeownership Centers

    Data.gov (United States)

    Department of Housing and Urban Development — HUD Homeownership Centers (HOCs) insure single family Federal Housing Administration (FHA) mortgages and oversee the selling of HUD homes. FHA has four Homeownership...

  6. 24 CFR 1000.336 - How may an Indian tribe, TDHE, or HUD challenge data or appeal HUD formula determinations?

    Science.gov (United States)

    2010-04-01

    ... (FMRs); and (7) Indian Health Service projections based upon birth and death rate data provided by the National Center for Health Statistics. (b) An Indian tribe or TDHE may not challenge data or HUD formula...

  7. 75 FR 69363 - HUD Multifamily Rental Projects: Regulatory Revisions

    Science.gov (United States)

    2010-11-12

    ...) mortgage- backed securities, or other bond obligations specified by HUD, any of which contains a lock-out... proposed January 21, 2010. Comment: Paragraph (a)(1) of 24 CFR 207.258 should provide for an automatic 90-day extension of the deadline for filing notice of the mortgagee's election upon request. An automatic...

  8. 76 FR 24507 - HUD Multifamily Rental Project Closing Documents: Notice Announcing Final Approved Documents and...

    Science.gov (United States)

    2011-05-02

    ... transactions, although these are familiar roles in commercial lending transactions. Accordingly, HUD has... advantage of this language is that it identifies the specific, longstanding, and familiar types of... the documents, HUD is limiting its role and giving lenders more ability to address any problems that...

  9. 24 CFR 982.203 - Special admission (non-waiting list): Assistance targeted by HUD.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Special admission (non-waiting list... Admission to Tenant-Based Program § 982.203 Special admission (non-waiting list): Assistance targeted by HUD... family residing in a multifamily rental housing project when HUD sells, forecloses or demolishes the...

  10. HUD Exchange Grantee Database

    Data.gov (United States)

    Department of Housing and Urban Development — The About Grantees section of the HUD Exchange brings up contact information, reports, award, jurisdiction, and location data for organizations that receive HUD...

  11. IMPACT ASSESSMENT OF TROPICAL CYCLONE HUD HUD ON COASTAL REGION OF VISAKHAPATNAM, ANDHRA PRADESH, INDIA

    Directory of Open Access Journals (Sweden)

    G. Vivek

    2015-10-01

    Full Text Available Tropical cyclone is a rapidly rotating storm system characterized by a low pressure center, strong winds, and a spiral arrangements of thunderstorms that produce heavy rain. Tropical cyclones typically form over large bodies of relatively warm water. On 6th October 2014 Hud Hud originates from a low pressure system that formed under the influence of an upper air cyclonic circulation in the Andaman Sea. On 9th October 2014 the IMD department classified the Hud Hud as a very severe cyclonic storm on IMD scale and category 4 on Staffir-Simpson scale. The cyclone hit the coast of Visakhapatnam on 12th October 2014 at wind speed of 175 km/h which caused extensive damage to the city and the neighbouring districts. The damage caused by Cyclone Hud Hud not only changed the landscape of the port city, but also made it the first city in the country to be directly hit by a cyclone since 1891 as per the records of the IMD. The remote sensing technique used here is NDVI. NDVI will separate vegetation and non-vegetation part. The NDVI will be classified in ERDAS and calculated the area using ARCGIS. The satellite data of 4th October 2014 show s before the cyclone, 14th October 2014 shows after the cyclone and 7th December 2014 after two month of cyclone.

  12. DOE-HUD initiative on energy efficiency in housing: A federal partnership

    Energy Technology Data Exchange (ETDEWEB)

    Brinch, J. [Energetics, Inc., Columbia, MD (United States); Ternes, M. [Oak Ridge National Lab., TN (United States); Myers, M. [USDOE, Washington, DC (United States)

    1996-07-01

    A five-year initiative between the US Department of Energy (DOE) and the US Department of Housing and Urban Development (HUD) demonstrated the feasibility of improving the energy efficiency of publicly-assisted housing. Twenty-seven projects and activities undertaken during 1990--95 involved research and field demonstrations, institutional and administrative changes to HUD policies and procedures, innovative financing and leveraging of federal dollars with non-federal money, and education, training, and technical assistance. With most of the 27 projects and activities completed, the two departments have initiated a five-year deployment effort, the DOE-Energy Partnerships for Affordable Homes, to achieve energy and water savings in public and assisted housing on a large scale throughout the country. A Clearinghouse for Energy Efficiency in Public and Assisted Housing managed by the National Center for Appropriate Technology (NCAT), will offer hands-on energy assistance to housing providers to complement DOE`s assistance. This paper presents the findings of the DOE-HUD Initiative, with primary attention paid to those projects which successfully integrated energy efficiency into private and public single and multifamily housing. The paper includes examples of the publications, case-study reports, exhibits and videotapes developed during the course of the Initiative. Information on the new DOE Energy Partnerships and on the NCAT Clearinghouse is also presented. New Partnership projects with the Atlanta and Chicago Housing Authorities describe the technical assistance envisioned under the Partnership.

  13. 24 CFR 15.109 - How will HUD respond to a request for information from Form HUD-92410 (Statement of Profit and...

    Science.gov (United States)

    2010-04-01

    ... with their investment decision. (c) To whom may potential investors disclose such information... for information from Form HUD-92410 (Statement of Profit and Loss)? 15.109 Section 15.109 Housing and... Form HUD-92410 (Statement of Profit and Loss)? (a) To whom will HUD disclose the information? HUD will...

  14. HUD Continuum of Care (CoC) Awards (2005-2016)

    Data.gov (United States)

    City and County of Durham, North Carolina — HUD grantees receive funding from HUD to support HUD's mission to create strong, sustainable, inclusive communities and quality affordable homes for all. HUD...

  15. 24 CFR 970.15 - Specific criteria for HUD approval of demolition requests.

    Science.gov (United States)

    2010-04-01

    ... modifications is cost-effective to return the public housing project or portion of the project to useful life... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Specific criteria for HUD approval of demolition requests. 970.15 Section 970.15 Housing and Urban Development Regulations Relating to...

  16. Performance Benefits with Scene-Linked HUD Symbology: An Attentional Phenomenon?

    Science.gov (United States)

    Levy, Jonathan L.; Foyle, David C.; McCann, Robert S.; Null, Cynthia H. (Technical Monitor)

    1999-01-01

    Previous research has shown that in a simulated flight task, navigating a path defined by ground markers while maintaining a target altitude is more accurate when an altitude indicator appears in a virtual "scenelinked" format (projected symbology moving as if it were part of the out-the-window environment) compared to the fixed-location, superimposed format found on present-day HUDs (Foyle, McCann & Shelden, 1995). One explanation of the scene-linked performance advantage is that attention can be divided between scene-linked symbology and the outside world more efficiently than between standard (fixed-position) HUD symbology and the outside world. The present study tested two alternative explanations by manipulating the location of the scene-linked HUD symbology relative to the ground path markers. Scene-linked symbology yielded better ground path-following performance than standard fixed-location superimposed symbology regardless of whether the scene-linked symbology appeared directly along the ground path or at various distances off the path. The results support the explanation that the performance benefits found with scene-linked symbology are attentional.

  17. HUD Subprime and Manufactured Home Lender List

    Data.gov (United States)

    Department of Housing and Urban Development — The U.S. Department of Housing and Urban Development (HUD) periodically produce its HUD Subprime and Manufactured home Lender List for the lenders who specialize in...

  18. Analyzing Drivers' Attitude towards HUD System Using a Stated Preference Survey

    Directory of Open Access Journals (Sweden)

    Hongwei Guo

    2014-02-01

    Full Text Available It is very important for drivers to obtain driving information easily and efficiently. There are many advanced devices used for driving safety assistance. Of these assistance devices, the head-up display (HUD system can promote the reduction of driver's reaction time and improve spatial awareness. The drivers' attitude towards and preference for HUD system are crucial to design the functional framework and interface of HUD system. This study explored the relationships between drivers' attitude and HUD presentation image designs using stated preference data from questionnaire survey. The questionnaire included drivers' attitude towards the use of HUD and the preference for the information display zone and information display elements of the HUD. Contrastive analysis was adopted to examine the variations in drivers' attitude and preference for age and driving skills. According to the results, the participants have varying attitudes to HUD system, but most participants show relatively unified preference for the information display zone and information display elements. The results can also be used to customize a HUD presentation image which is in accordance with the drivers' feelings and preferences.

  19. 24 CFR 3500.10 - One-day advance inspection of HUD-1 or HUD-1A settlement statement; delivery; recordkeeping.

    Science.gov (United States)

    2010-04-01

    ... FOR HOUSING-FEDERAL HOUSING COMMISSIONER, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT REAL ESTATE... settlement agent shall permit the borrower to inspect the HUD-1 or HUD-1A settlement statement, completed to set forth those items that are known to the settlement agent at the time of inspection, during the...

  20. 24 CFR 146.3 - Purpose of HUD's age discrimination regulation.

    Science.gov (United States)

    2010-04-01

    ... RECEIVING FEDERAL FINANCIAL ASSISTANCE General § 146.3 Purpose of HUD's age discrimination regulation. The purpose of this part is to state HUD's policies and procedures under the Age Discrimination Act of 1975... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Purpose of HUD's age discrimination...

  1. HUD PowerSaver Pilot Loan Program

    Energy Technology Data Exchange (ETDEWEB)

    Zimring, Mark [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Hoffman, Ian [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2010-12-10

    The U.S. Department of Housing and Urban Development (HUD) recently announced the creation of a pilot loan program for home energy improvements. The PowerSaver loan program is a new, energy-focused variant of the Title I Property Improvement Loan Insurance Program (Title I Program) and is planned for introduction in early 2011. The PowerSaver pilot will provide lender insurance for secured and unsecured loans up to $25,000 to single family homeowners. These loans will specifically target residential energy efficiency and renewable energy improvements. HUD estimates the two-year pilot will fund approximately 24,000 loans worth up to $300 million; the program is not capped. The Federal Housing Administration (FHA), HUD's mortgage insurance unit, will provide up to $25 million in grants as incentives to participating lenders. FHA is seeking lenders in communities with existing programs for promoting residential energy upgrades.

  2. HUD GIS Boundary Files

    Data.gov (United States)

    Department of Housing and Urban Development — The HUD GIS Boundary Files are intended to supplement boundary files available from the U.S. Census Bureau. The files are for community planners interested in...

  3. HUD's Local Office Directory

    Data.gov (United States)

    Department of Housing and Urban Development — HUD is organized in 10 Regions. Each Region is managed by a Regional Administrator, who also oversees the Regional Office. Each Field Office within a Region is...

  4. 76 FR 62434 - HUD Draft Environmental Justice Strategy

    Science.gov (United States)

    2011-10-07

    ... Justice Strategy AGENCY: Office of the Sustainable Housing and Communities, HUD. ACTION: Notice. SUMMARY: Through this notice, HUD announces the release of its draft Environmental Justice Strategy for review and... federal agency, with the law as its guide, should make environmental justice part of its mission. In this...

  5. Three-dimensional system integration for HUD placement on a new tactical airlift platform: design eye point vs. HUD eye box with accommodation and perceptual implications

    Science.gov (United States)

    Harbour, Steven D.; Hudson, Jeffery A.; Zehner, Gregory F.

    2012-06-01

    The retrofitting of a cockpit with a Head-Up-Display (HUD) raises potential accommodation and perceptual issues for pilots that must be addressed. For maximum optical efficiency, the goal is to be able to place every pilot's eye into the HUD Eye Motion Box (EMB) given a seat adjustment range. Initially, the Eye Reference Point (ERP) of the EMB should theoretically be located on the aircraft's original cockpit Design Eye Point (DEP), but human postures vary, and HUD systems may not be optimally placed. In reality, there is a distribution of pilot eyes around the DEP (which is dominant eye dependent); therefore, this must be accounted for in order to obtain appropriate visibility of all of the symbology based on photonic characteristics of the HUD. Pilot size and postural variation need to be taken into consideration when positioning the HUD system to ensure proper vision of all HUD symbology in addition to meeting the basic physical accommodation requirements of the cockpit. The innovative process and data collection methods for maximizing accommodation and pilot perception on a new "tactical airlift" platform are discussed as well as the related neurocognitive factors and the effects of information display design on cognitive phenomena.

  6. 24 CFR Appendix A to Part 3500 - Instructions for Completing HUD-1 and HUD-1a Settlement Statements; Sample HUD-1 and HUD-1a...

    Science.gov (United States)

    2010-04-01

    ... originator (other than for no-cost loans), real estate agent, other settlement service provider, or other..., real estate agent, or any other person, must be included on the HUD-1 but marked “P.O.C.” for “Paid... settlement agent disburses portions of the commission to two or more sales agents or real estate brokers...

  7. Approaches to the design of low-cost HUD systems

    Science.gov (United States)

    Wisely, Paul L.; Bleha, Willaim P.

    2014-06-01

    Since their inception during the Second World War in the simple gyro reflector gun sights of combat aircraft such as the Supermarine Spitfire, HUDs have been developed to achieve ever greater capability and performance, initially in military applications but in the final quarter of the last century for civil applications. With increased performance and capability came increased complexity and an attendant steady increase in cost such that HUDs in civil applications are only to be found in some large passenger and high end business jets. The physical volume of current solutions also has a significant impact on where they may be fitted and this paper discusses techniques and approaches to reduce the volume and costs associated with HUD implementation thereby making the operational and safety benefits of HUD available to a broader range of applications in lower cost airframes.

  8. 24 CFR 15.112 - How will HUD respond to my appeal?

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false How will HUD respond to my appeal... respond to my appeal? (a) How much time does HUD have to decide my appeal? HUD will decide your appeal of a denial of expedited processing within 10 working days after its receipt. For any other type of...

  9. HuD Regulates Coding and Noncoding RNA to Induce APP→Aβ Processing

    Directory of Open Access Journals (Sweden)

    Min-Ju Kang

    2014-06-01

    Full Text Available The primarily neuronal RNA-binding protein HuD is implicated in learning and memory. Here, we report the identification of several HuD target transcripts linked to Alzheimer’s disease (AD pathogenesis. HuD interacted with the 3′ UTRs of APP mRNA (encoding amyloid precursor protein and BACE1 mRNA (encoding β-site APP-cleaving enzyme 1 and increased the half-lives of these mRNAs. HuD also associated with and stabilized the long noncoding (lncRNA BACE1AS, which partly complements BACE1 mRNA and enhances BACE1 expression. Consistent with HuD promoting production of APP and APP-cleaving enzyme, the levels of APP, BACE1, BACE1AS, and Aβ were higher in the brain of HuD-overexpressing mice. Importantly, cortex (superior temporal gyrus from patients with AD displayed significantly higher levels of HuD and, accordingly, elevated APP, BACE1, BACE1AS, and Aβ than did cortical tissue from healthy age-matched individuals. We propose that HuD jointly promotes the production of APP and the cleavage of its amyloidogenic fragment, Aβ.

  10. HUD Digital Government Strategy Report

    Data.gov (United States)

    Department of Housing and Urban Development — The HUD Digital Strategic Plan clearly articulates the goals of openness and transparency, furthering the innovation economy and meeting more global government wide...

  11. HUD Approved Housing Counseling Agencies

    Data.gov (United States)

    Department of Housing and Urban Development — HUD sponsors housing counseling agencies throughout the country that can provide advice on buying a home, renting, defaults, foreclosures, and credit issues. This...

  12. IT Project Selection

    DEFF Research Database (Denmark)

    Pedersen, Keld

    2016-01-01

    for initiation. Most of the research on project selection is normative, suggesting new methods, but available empirical studies indicate that many methods are seldom used in practice. This paper addresses the issue by providing increased understanding of IT project selection practice, thereby facilitating...... the development of methods that better fit current practice. The study is based on naturalistic decision-making theory and interviews with experienced project portfolio managers who, when selecting projects, primarily rely on political skills, experience and personal networks rather than on formal IT project......-selection methods, and these findings point to new areas for developing new methodological support for IT project selection....

  13. 75 FR 423 - Notice of Availability: HUD Real Estate Settlement Procedures Act (RESPA) Handbook

    Science.gov (United States)

    2010-01-05

    .... Under RESPA, lenders and mortgage brokers are required to give borrowers this Booklet within three days... notice, HUD announces the availability on its Web site of the revised special information booklet... Web site at: http://www.hud.gov/utilities/intercept.cfm?http://portal.hud.gov/portal/page/portal/HUD...

  14. 75 FR 67992 - Notice of Proposed Information Collection: Comment Request; HUD Stakeholder Survey

    Science.gov (United States)

    2010-11-04

    ... Information Collection: Comment Request; HUD Stakeholder Survey AGENCY: Office of the Chief Information... responses. This Notice also lists the following information: Title of Proposal: HUD Stakeholder Survey. OMB... to educate stakeholders about HUD initiatives and policies. This data collection consists of a brief...

  15. 76 FR 24045 - Notice of HUD-Held Multifamily Loan Sale (MLS 2011-1)

    Science.gov (United States)

    2011-04-29

    ..., the bidder's deposit was non-refundable and was applied toward the purchase price. Deposits were... Commissioner, HUD. ACTION: Notice of sale of mortgage loans. SUMMARY: This notice announces HUD's intention to... INFORMATION: HUD announces its intention to sell in MLS 2011-1 certain unsubsidized mortgage loans (Mortgage...

  16. 77 FR 64399 - Order of Succession for HUD Region V

    Science.gov (United States)

    2012-10-19

    ... Region V AGENCY: Office of Field Policy and Management, HUD. ACTION: Notice of Order of Succession... Field Offices (Region V). This Order of Succession supersedes all previous Orders of Succession for HUD Region V. DATES: Effective Date: October 9, 2012. FOR FURTHER INFORMATION CONTACT: Lawrence D. Reynolds...

  17. 77 FR 64402 - Order of Succession for HUD Region X

    Science.gov (United States)

    2012-10-19

    ... Region X AGENCY: Office of Field Policy and Management, HUD. ACTION: Notice of Order of Succession... Field Offices (Region X). This Order of Succession supersedes all previous Orders of Succession for HUD Region X. DATES: Effective Date: October 9, 2012. FOR FURTHER INFORMATION CONTACT: Lawrence D. Reynolds...

  18. 77 FR 64400 - Order of Succession for HUD Region VII

    Science.gov (United States)

    2012-10-19

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [FR-5550-D-10] Order of Succession for HUD Region VII... Offices (Region VII). This Order of Succession supersedes all previous Orders of Succession for HUD Region...). This publication supersedes all previous Orders of Succession for Region VII. Accordingly, the...

  19. 77 FR 64398 - Order of Succession for HUD Region IV

    Science.gov (United States)

    2012-10-19

    ... Region IV AGENCY: Office of Field Policy and Management, HUD. ACTION: Notice of Order of Succession... Field Offices (Region IV). This Order of Succession supersedes all previous Orders of Succession for HUD Region IV. DATES: Effective Date: October 9, 2012. FOR FURTHER INFORMATION CONTACT: Lawrence D. Reynolds...

  20. 77 FR 64397 - Order of Succession for HUD Region III

    Science.gov (United States)

    2012-10-19

    ... Region III AGENCY: Office of Field Policy and Management, HUD. ACTION: Notice of Order of Succession... Office and its Field Offices (Region III). This Order of Succession supersedes all prior Orders of Succession for HUD Region III. DATES: Effective Date: October 9, 2012. FOR FURTHER INFORMATION CONTACT...

  1. 77 FR 64401 - Order of Succession for HUD Region VIII

    Science.gov (United States)

    2012-10-19

    ... Region VIII AGENCY: Office of Field Policy and Management, HUD. ACTION: Notice of Order of Succession... Field Offices (Region VIII). This Order of Succession supersedes all previous Orders of Succession for HUD Region VIII. DATES: Effective Date: October 9, 2012. FOR FURTHER INFORMATION CONTACT: Lawrence D...

  2. 77 FR 64396 - Order of Succession for HUD Region I

    Science.gov (United States)

    2012-10-19

    ... Region I AGENCY: Office of Field Policy and Management, HUD. ACTION: Notice of Order of Succession... Field Offices (Region I). This Order of Succession supersedes all previous Orders of Succession for HUD Region I. DATES: Effective Date: October 9, 2012. FOR FURTHER INFORMATION CONTACT: Lawrence D. Reynolds...

  3. 77 FR 64399 - Order of Succession for HUD Region VI

    Science.gov (United States)

    2012-10-19

    ... Region VI AGENCY: Office of Field Policy and Management, HUD. ACTION: Notice of Order of Succession... its Field Offices (Region VI). This Order of Succession supersedes all previous Orders of Succession for HUD Region VI. DATES: Effective Date: October 9, 2012. FOR FURTHER INFORMATION CONTACT: Lawrence D...

  4. 76 FR 375 - Notice of Availability: Notice of Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2010...

    Science.gov (United States)

    2011-01-04

    ... comprehensive projects that address the problems of concentrated rural housing distress and community poverty... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5415-N-35] Notice of Availability: Notice of Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2010 Rural Innovation Fund Program...

  5. 77 FR 64401 - Order of Succession for HUD Region IX

    Science.gov (United States)

    2012-10-19

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [FR-5550-D-12] Order of Succession for HUD Region IX... Field Offices (Region IX). This Order of Succession supersedes all previous Orders of Succession for HUD Region IX. DATES: Effective Date: October 9, 2012. FOR FURTHER INFORMATION CONTACT: Lawrence D. Reynolds...

  6. 24 CFR 200.936 - Supplementary specific procedural requirements under HUD building products certification program...

    Science.gov (United States)

    2010-04-01

    ... requirements under HUD building products certification program for solid fuel type room heaters and fireplace... Supplementary specific procedural requirements under HUD building products certification program for solid fuel... fireplace stoves certified under the HUD Building Products Certification Program shall be designed...

  7. 24 CFR 200.935 - Administrator qualifications and procedures for HUD building products certification programs.

    Science.gov (United States)

    2010-04-01

    ... procedures for HUD building products certification programs. 200.935 Section 200.935 Housing and Urban... for HUD building products certification programs. (a) General. This section establishes administrator qualifications and procedures for the HUD Building Products Certification Programs under section 521 of the...

  8. HUD Guidance for the ASKA Experimental STOL Aircraft using Radar Position Information

    Science.gov (United States)

    Yazawa, Kenji; Terui, Yushi; Hardy, Gordon H.

    1992-01-01

    The paper describes a high performance HUD guidance system installed on the experimental powered-lift STOL aircraft Aska. Since the maiden flight in October 1985, the HUD system has been used in all the flight tests. The HUD has an accurate flight path symbol generated by inertial velocity from the IRS which is updated by up-linked precision radar position data. The flight path symbol is very useful for precise approach and flare control for Aska which has large ground effects. A synthetic runway is also presented, which is conformal with the real runway, using the position data from the ground tracking radar system. Under instrument meteorological conditions, the pilot can approach and land using the HUD synthetic runway as well as in visual meteorological conditions. The HUD system proved to be a valuable aid to the pilot for all the Aska flight tests. A NASA Ames Research Center test pilot demonstrated touch down accuracy of less than 8 meters (peak to peak) for a series of three landings.

  9. HUD Hearings and Appeals Office Decisions

    Data.gov (United States)

    Department of Housing and Urban Development — These all of the Administrative Sanction decisions issued by the Office of Appeals and its predecessor, the HUD Board of Contract Appeals. This Office has included...

  10. 24 CFR 1000.112 - How will HUD determine whether to approve model housing activities?

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false How will HUD determine whether to approve model housing activities? 1000.112 Section 1000.112 Housing and Urban Development Regulations... Activities § 1000.112 How will HUD determine whether to approve model housing activities? HUD will review all...

  11. HUD Low and Moderate Income Areas

    Data.gov (United States)

    Department of Housing and Urban Development — This dataset and map service provides information on the U.S. Housing and Urban Development's (HUD) low to moderate income areas. The term Low to Moderate Income,...

  12. 75 FR 61167 - Notice of Availability: Notice of Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2010...

    Science.gov (United States)

    2010-10-04

    ... participating in HUD's Housing Counseling Program, including HUD-approved agencies, affiliates and branches of...: Notice of Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2010 Housing Counseling Training Program... requirements for HUD's Housing Counseling Training Program NOFA for FY2010. This year's Housing Counseling...

  13. 75 FR 44006 - Notice of Submission of Proposed Information Collection to OMB, HUD-Owned Real Estate-Sales...

    Science.gov (United States)

    2010-07-27

    ... known lead-based paint and lead-based paint hazards in HUD sales of pre-1978 construction. Frequency of... Proposed Information Collection to OMB, HUD-Owned Real Estate--Sales Contracts and Addenda (HUD Programs... sales contracts and addenda in conjunction with offers to purchase HUD-owned property. The sales...

  14. 75 FR 67392 - Notice of Availability: HUD's Fiscal Year (FY) NOFA for the Choice Neighborhoods Initiative-Round...

    Science.gov (United States)

    2010-11-02

    ..., HUD. ACTION: Notice extension of deadline. SUMMARY: On August 26, 2010, HUD posted on http://www...--Round 1. Today's Federal Register notice announces that HUD has posted on http://www.Grants.gov a... to the Mapping Tool used to determine neighborhood eligibility. HUD will post on http://www.Grants...

  15. 78 FR 78998 - 60-Day Notice of Proposed Information Collection: HUD Environmental Review Online System (HEROS)

    Science.gov (United States)

    2013-12-27

    ... Information Collection: HUD Environmental Review Online System (HEROS) AGENCY: Office of Community Planning... Information Collection Title of Information Collection: HUD Environmental Review Online System (HEROS). OMB... online tool called the HUD Environmental Review Online System (HEROS), which will allow users to complete...

  16. 78 FR 70958 - 30-Day Notice of Proposed Information Collection: Recordkeeping for HUD's Continuum of Care Program

    Science.gov (United States)

    2013-11-27

    ... individuals, families, and communities by homelessness; promote access to and effective utilization of... Information Collection: Recordkeeping for HUD's Continuum of Care Program AGENCY: Office of the Chief Information Officer, HUD. ACTION: Notice. SUMMARY: HUD has submitted the proposed information collection...

  17. Flight test of a head-worn display as an equivalent-HUD for terminal operations

    Science.gov (United States)

    Shelton, K. J.; Arthur, J. J.; Prinzel, L. J.; Nicholas, S. N.; Williams, S. P.; Bailey, R. E.

    2015-05-01

    Research, development, test, and evaluation of flight deck interface technologies is being conducted by NASA to proactively identify, develop, and mature tools, methods, and technologies for improving overall aircraft safety of new and legacy vehicles operating in the Next Generation Air Transportation System (NextGen). Under NASA's Aviation Safety Program, one specific area of research is the use of small Head-Worn Displays (HWDs) as a potential equivalent display to a Head-up Display (HUD). Title 14 of the US CFR 91.175 describes a possible operational credit which can be obtained with airplane equipage of a HUD or an "equivalent"' display combined with Enhanced Vision (EV). A successful HWD implementation may provide the same safety and operational benefits as current HUD-equipped aircraft but for significantly more aircraft in which HUD installation is neither practical nor possible. A flight test was conducted to evaluate if the HWD, coupled with a head-tracker, can provide an equivalent display to a HUD. Approach and taxi testing was performed on-board NASA's experimental King Air aircraft in various visual conditions. Preliminary quantitative results indicate the HWD tested provided equivalent HUD performance, however operational issues were uncovered. The HWD showed significant potential as all of the pilots liked the increased situation awareness attributable to the HWD's unique capability of unlimited field-of-regard.

  18. OCCURRENCE OF ENTOMOPATHOGENIC FUNGI IN SOILS FROM FESTUCA PRATENSIS HUDS. CROP

    Directory of Open Access Journals (Sweden)

    Roman Kolczarek

    2014-04-01

    Full Text Available Entomopathogenic fungi are the largest group of microorganisms existing in the soil environment. Occurrence and pathogenicity of entomopathogenic fungi in soil is dependent on many factors affecting the soil environment. The aim of this study was to compare the species composition and the intensity of the occurrence of entomopathogenic fungi in soils from monoculture crops of Festuca pratensis Huds. The study material consisted of soil samples taken from the experiment conducted in two experimental stations of the Research Centre for Cultivars Study. The insecticides fungi were isolated from soil using a method of the selective substrate. Three species of entomopathogenic fungi Beauveria bassiana, Isaria fumosorosea and Metarhizium anisopliae were isolated from the study soils using the selective medium.

  19. A microdisplay-based HUD for automotive applications: Backplane design, planarization, and optical implementation

    Science.gov (United States)

    Schuck, Miller Harry

    Automotive head-up displays require compact, bright, and inexpensive imaging systems. In this thesis, a compact head-up display (HUD) utilizing liquid-crystal-on-silicon microdisplay technology is presented from concept to implementation. The thesis comprises three primary areas of HUD research: the specification, design and implementation of a compact HUD optical system, the development of a wafer planarization process to enhance reflective device brightness and light immunity and the design, fabrication and testing of an inexpensive 640 x 512 pixel active matrix backplane intended to meet the HUD requirements. The thesis addresses the HUD problem at three levels, the systems level, the device level, and the materials level. At the systems level, the optical design of an automotive HUD must meet several competing requirements, including high image brightness, compact packaging, video-rate performance, and low cost. An optical system design which meets the competing requirements has been developed utilizing a fully-reconfigurable reflective microdisplay. The design consists of two optical stages, the first a projector stage which magnifies the display, and a second stage which forms the virtual image eventually seen by the driver. A key component of the optical system is a diffraction grating/field lens which forms a large viewing eyebox while reducing the optical system complexity. Image quality biocular disparity and luminous efficacy were analyzed and results of the optical implementation are presented. At the device level, the automotive HUD requires a reconfigurable, video-rate, high resolution image source for applications such as navigation and night vision. The design of a 640 x 512 pixel active matrix backplane which meets the requirements of the HUD is described. The backplane was designed to produce digital field sequential color images at video rates utilizing fast switching liquid crystal as the modulation layer. The design methodology is discussed

  20. 75 FR 33323 - Notice of Availability: Notice of HUD's Fiscal Year (FY) 2010 Notice of Funding Availability...

    Science.gov (United States)

    2010-06-11

    ... Fair Housing; (4) Capacity Building and Knowledge Sharing; (5) Using Housing as a Platform for Improving Other Outcomes; and (6) Expanding Cross-Cutting Policy Knowledge. Detailed information on HUD's Strategic Plan for FY2010-2015 is available at: http://portal.hud.gov/portal/page/portal/HUD/program_offices...

  1. 78 FR 52964 - Availability of HUD's Fiscal Years 2011 and 2012 Service Contract Inventories

    Science.gov (United States)

    2013-08-27

    ... and 2012 Service Contract Inventories AGENCY: Office of the Chief Procurement Officer, HUD. ACTION... inventories that were awarded in FY 2011 and FY 2012. The inventories are organized by function and are... insure HUD maintains an adequate workforce for operations and to research whether contractors were...

  2. 78 FR 23777 - Notice of Proposed Information Collection: Comment Request: HUD-Administered Small Cities Program...

    Science.gov (United States)

    2013-04-22

    ... Information Collection: Comment Request: HUD- Administered Small Cities Program Performance Assessment Report... program provides HUD with financial and physical development status of each activity funded. These reports[email protected] fax: 202-395-5806. FOR FURTHER INFORMATION CONTACT: Colette Pollard, Reports...

  3. 78 FR 44582 - Notice of HUD-Held Multifamily & Healthcare Loan Sale, (MHLS 2013-2)

    Science.gov (United States)

    2013-07-24

    .... Hearing- or speech-impaired individuals may call 202-708-4594 (TTY). These are not toll-free numbers... to submit bids on the Mortgage Loans in MHLS 2013-2. Freedom of Information Act Requests HUD reserves... to disclose any information that HUD is obligated to disclose pursuant to the Freedom of Information...

  4. 24 CFR 200.940 - Supplementary specific requirements under the HUD building product standards and certification...

    Science.gov (United States)

    2010-04-01

    ... under the HUD building product standards and certification program for sealed insulating glass units... Supplementary specific requirements under the HUD building product standards and certification program for... specific building product certification program. In the case of sealed insulating glass units, testing and...

  5. 24 CFR 200.954 - Supplementary specific requirements under the HUD building product standard and certification...

    Science.gov (United States)

    2010-04-01

    ... under the HUD building product standard and certification program for construction adhesives for wood... § 200.954 Supplementary specific requirements under the HUD building product standard and certification...) concerning labeling of a product, the administrator's validation mark and the manufacturer's certification of...

  6. 24 CFR 200.955 - Supplementary specific requirements under the HUD building product standard and certification...

    Science.gov (United States)

    2010-04-01

    ... under the HUD building product standard and certification program for fenestration products (windows and... Supplementary specific requirements under the HUD building product standard and certification program for... testing for a product shall be described in the specific building product certification program. In the...

  7. 24 CFR 200.952 - Supplementary specific requirements under the HUD building product standards and certification...

    Science.gov (United States)

    2010-04-01

    ... under the HUD building product standards and certification program for particleboard interior stair... Supplementary specific requirements under the HUD building product standards and certification program for... forth in § 200.935(d)(6) concerning labeling of a product, the administrator's validation mark and the...

  8. 24 CFR 200.943 - Supplementary specific requirements under the HUD building product standards and certification...

    Science.gov (United States)

    2010-04-01

    ... under the HUD building product standards and certification program for the grademarking of lumber. 200... Supplementary specific requirements under the HUD building product standards and certification program for the... compliance with the U.S. Department of Commerce Voluntary Product Standard PS 20-94 American Softwood Lumber...

  9. 76 FR 24041 - Notice of Proposed Information Collection: Comment Request; HUD Housing Counseling Program-Agency...

    Science.gov (United States)

    2011-04-29

    ... a HUD-approved intermediary or multi-state organization, or be a state housing finance agency or affiliate or sub grantee of a state housing finance agency. Participation in the program entails meeting.... Additionally, this information helps HUD staff to assess whether participating organizations are meeting basic...

  10. 24 CFR 200.945 - Supplementary specific requirements under the HUD building product standards and certification...

    Science.gov (United States)

    2010-04-01

    ... under the HUD building product standards and certification program for carpet. 200.945 Section 200.945... requirements under the HUD building product standards and certification program for carpet. (a) Applicable.... (b) Labeling. Under the procedures set forth in § 200.935(d)(6) concerning labeling of a product, the...

  11. 76 FR 5393 - Notice of Submission of Proposed Information Collection to OMB; HUD Stakeholder Survey

    Science.gov (United States)

    2011-01-31

    ... Proposed Information Collection to OMB; HUD Stakeholder Survey AGENCY: Office of the Chief Information... will allow HUD to collect feedback from a wide range of stakeholder groups using a brief, optional survey to be completed in person at the end of each stakeholder event. The events range in size from...

  12. 76 FR 71593 - Notice of HUD-Held Multifamily and Healthcare Loan Sale (MHLS 2012-1)

    Science.gov (United States)

    2011-11-18

    ... speech-impaired individuals may call (202) 708-4594 (TTY). These are not toll-free numbers. SUPPLEMENTARY... to submit bids on the Mortgage Loans in MHLS 2012-1. Freedom of Information Act Requests HUD reserves... to disclose any information that HUD is obligated to disclose pursuant to the Freedom of Information...

  13. IDENTIFICATION AND SELECTION OF SIX SIGMA PROJECTS

    Directory of Open Access Journals (Sweden)

    Abdalhkeim FA. Flifel

    2017-04-01

    Full Text Available Six Sigma is a well-structured and proven methodology for improving organizational performance. It helps achieving the goals of the organization through the use of project-driven approach. The implementation of Six sigma approach depends on proper identification and selection of projects, moreover, the selection of right Six sigma projects is one of the critical success factors of six sigma efforts. The paper provides the sources for the identification of potential projects, top down and bottom up approaches, the process of selection of projects, guidelines that assist the selection of appropriate projects, selection criteria which must be precisely chosen in accordance with the objectives, needs and capabilities of the organization as well as sophisticated techniques and tools recommended in the literature for the selection of projects.

  14. 76 FR 46835 - Notice of Submission of Proposed Information Collection to OMB; HUD Loan Sales Bidder...

    Science.gov (United States)

    2011-08-03

    ... Proposed Information Collection to OMB; HUD Loan Sales Bidder Qualification Statement AGENCY: Office of the... respond; including through the use of appropriate automated collection techniques or other forms of... following information: Title of Proposal: HUD Loan Sales Bidder Qualification Statement. OMB Approval Number...

  15. 24 CFR 964.14 - HUD policy on partnerships.

    Science.gov (United States)

    2010-04-01

    ... creating positive changes in lifestyles thus improving the quality of life for public housing residents... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false HUD policy on partnerships. 964.14 Section 964.14 Housing and Urban Development Regulations Relating to Housing and Urban Development...

  16. 24 CFR 15.110 - What fees will HUD charge?

    Science.gov (United States)

    2010-04-01

    ... estimated fee is more than $250.00 or you have a history of failing to pay FOIA fees to HUD in a timely... consumer credit reporting agencies of your delinquency. (3) If you owe fees for previous FOIA responses...

  17. 75 FR 62412 - Notice of Proposed Information Collection: Comment Request; HUD-Owned Real Estate-Good Neighbor...

    Science.gov (United States)

    2010-10-08

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5380-N-36] Notice of Proposed Information Collection: Comment Request; HUD- Owned Real Estate-Good Neighbor Next Door Program AGENCY: Office... information: Title of Proposal: HUD-Owned Real Estate-Good Neighbor Next Door Program. OMB Control Number, if...

  18. 75 FR 62413 - Notice of Proposed Information Collection: Comment Request; HUD-Owned Real Estate-Dollar Home...

    Science.gov (United States)

    2010-10-08

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5380-N-38] Notice of Proposed Information Collection: Comment Request; HUD- Owned Real Estate--Dollar Home Sales Program AGENCY: Office of... information: Title of Proposal: HUD-Owned Real Estate--Dollar Home Sales Program. OMB Control Number, if...

  19. 24 CFR 1710.29 - Use of property report-misstatements, omissions or representation of HUD approval prohibited.

    Science.gov (United States)

    2010-04-01

    ...-misstatements, omissions or representation of HUD approval prohibited. 1710.29 Section 1710.29 Housing and Urban...—misstatements, omissions or representation of HUD approval prohibited. Nothing is these regulations shall be construed to authorize or approve the use of a property report containing any untrue statement of a material...

  20. 24 CFR 941.501 - HUD review of PHA performance; sanctions.

    Science.gov (United States)

    2010-04-01

    ... repay HUD for amounts awarded under the development programs that were improperly expended; (e) Types of... it an opportunity, within a prescribed period of time, to present any arguments or additional facts...

  1. 24 CFR 1000.60 - Can HUD prevent improper expenditure of funds already disbursed to a recipient?

    Science.gov (United States)

    2010-04-01

    ... expenditure of funds already disbursed to a recipient? 1000.60 Section 1000.60 Housing and Urban Development... § 1000.60 Can HUD prevent improper expenditure of funds already disbursed to a recipient? Yes. In accordance with the standards and remedies contained in § 1000.538 relating to substantial noncompliance, HUD...

  2. 24 CFR 1000.106 - What families receiving assistance under title II of NAHASDA require HUD approval?

    Science.gov (United States)

    2010-04-01

    ... under title II of NAHASDA require HUD approval? 1000.106 Section 1000.106 Housing and Urban Development... Housing Activities § 1000.106 What families receiving assistance under title II of NAHASDA require HUD... in §§ 1000.108 and 1000.110. (b) Assistance under section 201(b)(3) of NAHASDA for non-Indian...

  3. 76 FR 39221 - HUD Debt Collection: Revisions and Update to the Procedures for the Collection of Claims

    Science.gov (United States)

    2011-07-05

    ...' Group Life Insurance and ``Basic Life'' Federal Employees' Group Life Insurance premiums are considered to be normal life insurance premiums; all optional Federal Employees' Group Life Insurance premiums... Other Actions, would include the procedures that apply when HUD seeks satisfaction of debts owed to HUD...

  4. Nieuwe groeiplaats van Bijenorchis (Ophrys apifera Huds.) in Nederland

    NARCIS (Netherlands)

    Horsthuis, M.A.P.; Willink, G.

    2006-01-01

    Bijenorchis neemt toe in Nederland en wordt daarbij steeds noordelijker aangetroffen. In 2005 is een geïsoleerde groeiplaats gevonden in een kalkgroeve bij Winterswijk. Ophrys apifera Huds. is spreading northwards in the Netherlands. A new isolated population has been found near Winterswijk in a

  5. Project plan for joint FAA/NASA head-up display concept evaluation

    Science.gov (United States)

    Haines, R. F.

    1978-01-01

    Head-Up Display (HUD) concept for large commercial turbojet transport aircraft is considered for the its contribution to aviation safety in the form of improved performance during the approach and landing phase flight. The basic reearch areas represent fundamental questions that are still unresolved and which were considered important to the effective use of the HUD by pilots. Project documentation and management responsibilities are outlined.

  6. 76 FR 6488 - Notice of Submission of Proposed Information Collection to OMB; HUD-Owned Real Estate-Good...

    Science.gov (United States)

    2011-02-04

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5480-N-11] Notice of Submission of Proposed Information Collection to OMB; HUD-Owned Real Estate--Good Neighbor Next Door Program AGENCY... Lists the Following Information Title of Proposal: HUD-Owned Real Estate--Good Neighbor Next Door...

  7. 77 FR 17086 - Section 8 Housing Choice Vouchers: Revised Implementation of the HUD-VA Supportive Housing Program

    Science.gov (United States)

    2012-03-23

    ... Housing g. Mobility and Portability of HUD-VASH Vouchers h. Case Management Requirements i. Turnover of... veterans with case management and clinical services provided by the VA through its community medical... services sites and Community-Based Outpatient Clinics (CBOCs) across the nation. The HUD- VASH program is a...

  8. 76 FR 22122 - Section 8 Housing Choice Voucher Program-Demonstration Project of Small Area Fair Market Rents in...

    Science.gov (United States)

    2011-04-20

    ... Expensive Neighborhoods Comment: One commenter appeared to oppose the concept of small area FMRs, noting... information on poverty and racial concentration by ZIP Code. HUD Response: HUD must select areas with as many...

  9. 24 CFR 30.20 - Ethical violations by HUD employees.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Ethical violations by HUD employees. 30.20 Section 30.20 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development CIVIL MONEY PENALTIES: CERTAIN PROHIBITED CONDUCT Violations § 30.20 Ethical...

  10. 76 FR 15991 - HUD's Fiscal Year (FY) 2010 NOFA for the Self-Help Homeownership Opportunity Program (SHOP...

    Science.gov (United States)

    2011-03-22

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5415-C-34] HUD's Fiscal Year (FY) 2010... nonprofit organizations under federal or state law. This Notice also corrects sections in the NOFA that...Logic Model form HUD 96010 SHOP V12.3 012811. The coding in the form originally posted did not allow the...

  11. 78 FR 57873 - 60-Day Notice of Proposed Information Collection: HUD-Owned Real Estate-Sales Contract and Addendums

    Science.gov (United States)

    2013-09-20

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5687-N-36] 60-Day Notice of Proposed Information Collection: HUD-Owned Real Estate--Sales Contract and Addendums AGENCY: Office of the Assistant... Information Collection Title of Information Collection: HUD-Owned Real Estate--Sales Contract and Addendums...

  12. Radon in HUD assisted multifamily housing: Policy recommendations to the Congress

    International Nuclear Information System (INIS)

    1991-04-01

    The report complies with Section 1091 of the Stewart B. McKinney Homeless Assistance Amendments Act of 1988 which requires that the HUD Secretary report to the Congress on a recommended policy for addressing radon contamination in specified housing. The housing specified in the Act is virtually all rental housing predominantly for low-income and moderate-income households. Almost all of it is multifamily housing: row houses, walk-up apartment buildings, or high-rise buildings. There is inadequate information on the extent to which excessive concentrations of radon occur above the first floor of multistory buildings and on the variation in radon concentrations in attached houses in the same row. HUD's recommended policy is in the four topic areas specified in the Act: research, education, testing, and mitigation

  13. 78 FR 64145 - 30-Day Notice of Proposed Information Collection: HUD-Owned Real Estate-Sales Contract and Addendums

    Science.gov (United States)

    2013-10-25

    ...-family assets and HUD. Respondents (i.e. affected public): Business and other for profit. Estimated... requirement described below to the Office of Management and Budget (OMB) for review, in accordance with the... and should be sent to: HUD Desk Officer, Office of Management and Budget, New Executive Office...

  14. 78 FR 66040 - 30-Day Notice of Proposed Information Collection: HUD-Owned Real Estate-Sales Contract and Addendums

    Science.gov (United States)

    2013-11-04

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5683-N-91] 30-Day Notice of Proposed Information Collection: HUD-Owned Real Estate--Sales Contract and Addendums AGENCY: Office of the Chief... published a 30 day notice of proposed information collection entitled HUD-Owned Real Estate-Sales Contract...

  15. 24 CFR 245.417 - Initial submission of materials to HUD: Conversion of residential units to a nonresidential use...

    Science.gov (United States)

    2010-04-01

    ... HUD: Conversion of residential units to a nonresidential use, or to cooperative housing or... Covered Action § 245.417 Initial submission of materials to HUD: Conversion of residential units to a nonresidential use, or to cooperative housing or condominiums. In the case of a conversion of residential units...

  16. Space Projects: Improvements Needed in Selecting Future Projects for Private Financing

    Science.gov (United States)

    1990-01-01

    The Office of Management and Budget (OMB) and NASA jointly selected seven projects for commercialization to reduce NASA's fiscal year 1990 budget request and to help achieve the goal of increasing private sector involvement in space. However, the efforts to privately finance these seven projects did not increase the commercial sector's involvement in space to the extent desired. The General Accounting Office (GAO) determined that the projects selected were not a fair test of the potential of increasing commercial investment in space at an acceptable cost to the government, primarily because the projects were not properly screened. That is, neither their suitability for commercialization nor the economic consequences of seeking private financing for them were adequately evaluated before selection. Evaluations and market tests done after selection showed that most of the projects were not viable candidates for private financing. GAO concluded that projects should not be removed from NASA's budget for commercial development until after careful screening has been done to determine whether adequate commercial demand exists, development risks are commercially acceptable and private financing is found or judged to be highly likely, and the cost effectiveness of such a decision is acceptable. Premature removal of projects from NASA's budget ultimately can cause project delays and increased costs when unsuccessful commercialization candidates must be returned to the budget. NASA also needs to ensure appropriate comparisons of government and private financing options for future commercialization projects.

  17. 49 CFR 268.17 - Project selection criteria.

    Science.gov (United States)

    2010-10-01

    ... criteria will govern FRA's selection of projects to receive funding under the Maglev Deployment Program. (a... are to be expected in the United States. (4) The degree to which the project will augment a Maglev... development status of the Maglev technology selected by the applicant for the project. (c) Benefits for the...

  18. 77 FR 64396 - Order of Succession for HUD Region II

    Science.gov (United States)

    2012-10-19

    ... Region II AGENCY: Office of Field Policy and Management, HUD. ACTION: Notice of Order of Succession... Field Offices (Region II). This Order of Succession supersedes all previous Orders of Succession for Region II. DATES: Effective Date: October 9, 2012. FOR FURTHER INFORMATION CONTACT: Lawrence D. Reynolds...

  19. HuD and the Survival Motor Neuron Protein Interact in Motoneurons and Are Essential for Motoneuron Development, Function, and mRNA Regulation.

    Science.gov (United States)

    Hao le, Thi; Duy, Phan Q; An, Min; Talbot, Jared; Iyer, Chitra C; Wolman, Marc; Beattie, Christine E

    2017-11-29

    Motoneurons establish a critical link between the CNS and muscles. If motoneurons do not develop correctly, they cannot form the required connections, resulting in movement defects or paralysis. Compromised development can also lead to degeneration because the motoneuron is not set up to function properly. Little is known, however, regarding the mechanisms that control vertebrate motoneuron development, particularly the later stages of axon branch and dendrite formation. The motoneuron disease spinal muscular atrophy (SMA) is caused by low levels of the survival motor neuron (SMN) protein leading to defects in vertebrate motoneuron development and synapse formation. Here we show using zebrafish as a model system that SMN interacts with the RNA binding protein (RBP) HuD in motoneurons in vivo during formation of axonal branches and dendrites. To determine the function of HuD in motoneurons, we generated zebrafish HuD mutants and found that they exhibited decreased motor axon branches, dramatically fewer dendrites, and movement defects. These same phenotypes are present in animals expressing low levels of SMN, indicating that both proteins function in motoneuron development. HuD binds and transports mRNAs and one of its target mRNAs, Gap43 , is involved in axonal outgrowth. We found that Gap43 was decreased in both HuD and SMN mutants. Importantly, transgenic expression of HuD in motoneurons of SMN mutants rescued the motoneuron defects, the movement defects, and Gap43 mRNA levels. These data support that the interaction between SMN and HuD is critical for motoneuron development and point to a role for RBPs in SMA. SIGNIFICANCE STATEMENT In zebrafish models of the motoneuron disease spinal muscular atrophy (SMA), motor axons fail to form the normal extent of axonal branches and dendrites leading to decreased motor function. SMA is caused by low levels of the survival motor neuron (SMN) protein. We show in motoneurons in vivo that SMN interacts with the RNA binding

  20. TRISTAR I: Evaluation Methods for Testing Head-Up Display (HUD) Flight Symbology

    National Research Council Canada - National Science Library

    Newman, R

    1995-01-01

    A piloted head up display (HUD) flight symbology study (TRISTAR) measuring pilot task performance was conducted at the NASA Ames Research Center by the Tri-Service Flight Symbology Working Group (FSWO...

  1. 24 CFR 3500.4 - Reliance upon rule, regulation or interpretation by HUD.

    Science.gov (United States)

    2010-04-01

    ... issuance of HUD, Public Guidance Document, report to Congress, pleading, affidavit or other document in... or other material of any nature which is not specifically included in paragraph (a)(1) of this...

  2. A fuzzy hybrid approach for project manager selection

    Directory of Open Access Journals (Sweden)

    Ahmad Jafarnejad Chaghooshi

    2016-09-01

    Full Text Available Suitable project manager has a significant impact on successful accomplishment of the project. Managers should possess such skills in order to effectively cope with the competition. In this respect, selecting managers based on their skills can lead to a competitive advantage towards the achievement of organizational goals. selection of the suitable project manager can be viewed as a multi-criteria decision making (MCDM problem and an extensive evaluation of criteria, such as Technical skills, experience skills, Personal qualities and the related criteria must be considered in the selection process of project manager. The fuzzy set theory and MCDM methods appears as an essential tools to provide a decision framework that incorporates imprecise judgments and multi criteria nature of project manager selection process inherent in this process. This paper proposes the joint use of the Fuzzy DEMATEL (FDEMATEL and Fuzzy VIKOR methods for the decision-making process of selecting the most suitable managers for projects. First, with the opinions of the senior managers based on project management competency model (ICB-IPMA, all the criteria required for the selection are gathered. Then the FDEMATEL method is used to prioritize the importance of various criteria and FVIKOR used to rank the alternatives in a preferred order to select the best project managers from a number of alternatives. Next, a real case study used to illustrate the process of the proposed method. Finally, some conclusions are discussed at the end of this study.

  3. 49 CFR 268.21 - Down-selection of one or more Maglev projects for further study and selection of one project for...

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Down-selection of one or more Maglev projects for... Procedures For Financial Assistance § 268.21 Down-selection of one or more Maglev projects for further study... completion of Phase III of the Maglev Deployment Program, FRA will down-select one or more projects to...

  4. 75 FR 52689 - Multifamily Housing Reform and Affordability Act: Projects Eligible for a Restructuring Plan...

    Science.gov (United States)

    2010-08-27

    ... HUD-held financing. Essentially, these eligible projects are: (1) Those with rents that on average... CFR parts 401 and 402 (71 FR 2120). The regulatory definition of an eligible project was originally... the 1998 interim rule, the definition of ``eligible project'' read: Eligible project means a project...

  5. 24 CFR 983.58 - Environmental review.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Environmental review. 983.58... DEVELOPMENT PROJECT-BASED VOUCHER (PBV) PROGRAM Selection of PBV Owner Proposals § 983.58 Environmental review. (a) HUD environmental regulations. Activities under the PBV program are subject to HUD environmental...

  6. The Added Value of the Project Selection Process

    Directory of Open Access Journals (Sweden)

    Adel Oueslati

    2016-06-01

    Full Text Available The project selection process comes in the first stage of the overall project management life cycle. It does have a very important impact on organization success. The present paper provides defi nitions of the basic concepts and tools related to the project selection process. It aims to stress the added value of this process for the entire organization success. The mastery of the project selection process is the right way for any organization to ensure that it will do the right project with the right resources at the right time and within the right priorities

  7. Habitat Use Database - Groundfish Essential Fish Habitat (EFH) Habitat Use Database (HUD)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Habitat Use Database (HUD) was specifically designed to address the need for habitat-use analyses in support of groundfish EFH, HAPCs, and fishing and nonfishing...

  8. Selection of projects in the regional energy planning

    International Nuclear Information System (INIS)

    Ramirez P, R.; Navas M, F.

    1993-01-01

    The processes of regional energy planning have changed vastly in the last years and it will continue changing in the future for the new norm of the State. This work tries to show the use of systematic tools in the selection of regional energy projects. It discusses a methodology of selection of projects based on a multivariate technical. It is applied in the Southwestern region of Colombia and both selection and priority results are obtained. The designed methodology allows to make the selection of projects in an automatic way with a software designed for such an end. In the case of Southwestern it arrives to a briefcase of projects for an energy plan and made for other races

  9. Combinatorial Optimization in Project Selection Using Genetic Algorithm

    Science.gov (United States)

    Dewi, Sari; Sawaluddin

    2018-01-01

    This paper discusses the problem of project selection in the presence of two objective functions that maximize profit and minimize cost and the existence of some limitations is limited resources availability and time available so that there is need allocation of resources in each project. These resources are human resources, machine resources, raw material resources. This is treated as a consideration to not exceed the budget that has been determined. So that can be formulated mathematics for objective function (multi-objective) with boundaries that fulfilled. To assist the project selection process, a multi-objective combinatorial optimization approach is used to obtain an optimal solution for the selection of the right project. It then described a multi-objective method of genetic algorithm as one method of multi-objective combinatorial optimization approach to simplify the project selection process in a large scope.

  10. Project Selection for NASA's R&D Programs

    Science.gov (United States)

    Jones, Harry

    2005-01-01

    The purpose of NASA s Research and Development (R&D) programs is to provide advanced human support technologies for the Exploration Systems Mission Directorate (ESMD). The new technologies must be sufficiently attractive and proven to be selectable for future missions. This requires identifying promising candidate technologies and advancing them in technology readiness until they are likely options for flight. The R&D programs must select an array of technology development projects, manage them, and either terminate or continue them, so as to maximize the delivered number of potentially usable advanced human support technologies. This paper proposes an effective project selection methodology to help manage NASA R&D project portfolios.

  11. 24 CFR 886.121 - Marketing.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Marketing. 886.121 Section 886.121... Projects With HUD-Insured and HUD-Held Mortgages § 886.121 Marketing. (a) Marketing of units and selection... Housing Marketing Plan, if required, and with all regulations relating to fair housing advertising...

  12. PROJECT PORTFOLIO SELECTION COMPETENCES RESEARCH INUNIVERSITIES OF LITHUANIA

    OpenAIRE

    R #363;ta #268;iutien #279;; Evelina Meilien #279;; Bronius Neverauskas

    2011-01-01

    As a result of the theoretical findings, the paperdemonstrates that projectportfolio selection is crucial project management problem. Successful ProjectPortfolio management requires specific competences.Every project of projectportfolio must be evaluated according to the basedcriteria and parameters.Empirical study was based on framework matrix withfour parameters of projectportfolio selection and only two phases of projectportfolio formation. The r...

  13. 75 FR 66245 - HUD Programs: Violence Against Women Act Conforming Amendments

    Science.gov (United States)

    2010-10-27

    ... immigration laws, and made amendments to other statutes, including certain HUD statutes, to support and... ``Housing Opportunities and Safety for Battered Women and Children.'' Section 601 of VAWA 2005 amended VAWA.../pih/publications/notices/06/pih2006-23.pdf . PIH Notice 2006-23 was followed by PIH Notice 2006-42...

  14. 24 CFR 886.321 - Marketing.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Marketing. 886.321 Section 886.321... the Disposition of HUD-Owned Projects § 886.321 Marketing. (a) Marketing in accordance with HUD-Approved Plan. Marketing of units and selection of families by the owner shall be in accordance with the...

  15. Discriminative Projection Selection Based Face Image Hashing

    Science.gov (United States)

    Karabat, Cagatay; Erdogan, Hakan

    Face image hashing is an emerging method used in biometric verification systems. In this paper, we propose a novel face image hashing method based on a new technique called discriminative projection selection. We apply the Fisher criterion for selecting the rows of a random projection matrix in a user-dependent fashion. Moreover, another contribution of this paper is to employ a bimodal Gaussian mixture model at the quantization step. Our simulation results on three different databases demonstrate that the proposed method has superior performance in comparison to previously proposed random projection based methods.

  16. Selection of a portfolio of R & D projects

    NARCIS (Netherlands)

    Casault, Sébastien; Groen, Arend J.; Linton, J.D.; Linton, Jonathan; Link, A.N.; Vonortas, N.S.

    2013-01-01

    While portfolios of research are increasingly discussed, a portfolio perspective is infrequently taken when selecting two or more projects. Consequently, this chapter considers the current state of knowledge in project and portfolio selection, identifies why we can and cannot apply knowledge from

  17. ANP applied to electronics engineering project selection

    International Nuclear Information System (INIS)

    Habib, M.

    2010-01-01

    Project selection in Electronics engineering is a complex decision-making process. This research paper illustrates an application of ANP/AHP process. The AHP (Analytic Hierarchy Process) is employed to break down large unstructured decision problems into manageable and measureable components. The ANP, as the general form of AHP, is powerful to deal with complex decisions where interdependence exists in a decision model. The research paper discusses the use of the ANP, a general form of Saaty's analytic Network process, as a model to evaluate the value of competing Electronics projects. The research paper concludes with a case study describing the implementation of this model at an engineering college, including data based on the actual use of the decision making model. The case study helps to verify that AHP is an effective and efficient decision-making tool. A major contribution of this work is to provide a methodology for assessing the best project. Despite a number of publications applying AHP in project selection, this is probably the first time that an attempt has been made to apply AHP in an electronics project selection in an engineering university environment. (author)

  18. 77 FR 70179 - Notice of HUD-Held Multifamily and Healthcare Loan Sale

    Science.gov (United States)

    2012-11-23

    ...-2625, extension 3927. Hearing- or speech-impaired individuals may call 202-708-4594 (TTY). These are...-1. Freedom of Information Act Requests HUD reserves the right, in its sole and absolute discretion... disclose pursuant to the Freedom of Information Act and all regulations promulgated there under. Scope of...

  19. 78 FR 75215 - Qualified Mortgage Definition for HUD Insured and Guaranteed Single Family Mortgages

    Science.gov (United States)

    2013-12-11

    ...;Prices of new books are listed in the first FEDERAL REGISTER issue of each #0;week. #0; #0; #0; #0;#0... the treatment of Title II manufactured housing, but HUD's intention was to exempt Title II...

  20. METHOD FOR SELECTION OF PROJECT MANAGEMENT APPROACH BASED ON FUZZY CONCEPTS

    Directory of Open Access Journals (Sweden)

    Igor V. KONONENKO

    2017-03-01

    Full Text Available Literature analysis of works that devoted to research of the selection a project management approach and development of effective methods for this problem solution is given. Mathematical model and method for selection of project management approach with fuzzy concepts of applicability of existing approaches are proposed. The selection is made of such approaches as the PMBOK Guide, the ISO21500 standard, the PRINCE2 methodology, the SWEBOK Guide, agile methodologies Scrum, XP, and Kanban. The number of project parameters which have a great impact on the result of the selection and measure of their impact is determined. Project parameters relate to information about the project, team, communication, critical project risks. They include the number of people involved in the project, the customer's experience with this project team, the project team's experience in this field, the project team's understanding of requirements, adapting ability, initiative, and others. The suggested method is considered on the example of its application for selection a project management approach to software development project.

  1. 24 CFR 811.110 - Refunding of obligations issued to finance Section 8 projects.

    Science.gov (United States)

    2010-04-01

    ... finance Section 8 projects. 811.110 Section 811.110 Housing and Urban Development Regulations Relating to... RELATED AMENDMENTS § 811.110 Refunding of obligations issued to finance Section 8 projects. (a) This... refunding which generate the McKinney Act savings and, if necessary, HUD will finance in refunding bond debt...

  2. Combining AHP and DEA Methods for Selecting a Project Manager

    Directory of Open Access Journals (Sweden)

    Baruch Keren

    2014-07-01

    Full Text Available A project manager has a major influence on the success or failure of the project. A good project manager can match between the strategy and objectives of the organization and the goals of the project. Therefore, the selection of the appropriate project manager is a key factor for the success of the project. A potential project manager is judged by his or her proven performance and personal qualifications. This paper proposes a method to calculate the weighted scores and the full rank of candidates for managing a project, and to select the best of those candidates. The proposed method combines specific methodologies: the Data Envelopment Analysis (DEA and the Analytical Hierarchical Process (AHP and uses DEA Ranking Methods to enhance selection.

  3. 78 FR 74157 - Notice of HUD-Held Multifamily Loan Sale (MLS 2014-1)

    Science.gov (United States)

    2013-12-10

    ... Street SW., Washington, DC 20410-8000; telephone 202-708-2625, extension 3927. Hearing- or speech... 2014-1. Freedom of Information Act Requests HUD reserves the right, in its sole and absolute discretion... to the Freedom of Information Act and all regulations promulgated thereunder. Scope of Notice This...

  4. Crucibulum laeve (Huds. Kambly in cerrado vegetation of São Paulo, Brazil

    Directory of Open Access Journals (Sweden)

    Iuri Goulart Baseia

    2001-04-01

    Full Text Available A rare lignicolous gasteroid fungus of the tropics, Crucibulum laeve (Huds. Kambly is recorded for the first time from State of São Paulo and for de second time from Brazil, growing on decaying wood, occasionally on other plant debris, on soil under cerrado vegetation. Macro and microscopic features were described from fresh and dried basidiocarps using the traditional methods for Gasteromycetes. The substrate and the taxonomic characteristics agree closely with the literature consulted.Crucibulum laeve (Huds. Kambly, um raro gasteromicete lignícolo nos tropicos, é registrado pela primeira vez para o Estado de São Paulo e pela segunda vez para o Brasil, crescendo sobre madeira em decomposição e ocasionalmente sobre outros fragmentos de plantas em solo, sob vegetação de cerrado. É dada a descrição das características macro e microscópicas a partir de basidiocarpos frescos e secos, usando a metodologia tradicional para estudos de Gasteromycetes. O substrato e as características taxonômicas concordam com a literatura consultada.

  5. Ficaria verna Huds. extracts and their β-cyclodextrin supramolecular systems

    Directory of Open Access Journals (Sweden)

    Hădărugă Nicoleta G

    2012-03-01

    Full Text Available Abstract Background Obtaining new pharmaceutical materials with enhanced properties by using natural compounds and environment-friendly methods is a continuous goal for scientists. Ficaria verna Huds. is a widespread perennial plant with applications in the treat of haemorrhoids and to cure piles; it has also anti-inflammatory, astringent, and antibiotic properties. The goal of the present study is the obtaining and characterization of new F. verna extract/β-cyclodextrin complexes by using only natural compounds, solvents, and environment-friendly methods in order to increase the quality and acceptability versus toxicity indicator. Thus, the flavonoid content (as quercetin of Ficaria verna Huds. flowers and leaves from the West side of Romania was determined and correlated with their antioxidant activity. Further, the possibility of obtaining β-cyclodextrin supramolecular systems was studied. Results F. verna flowers and leaves extracts were obtained by semi-continuous solid-liquid extraction. The raw concentrated extract was spectrophotometrically analyzed in order to quantify the flavonoids from plant parts and to evaluate the antioxidant activity of these extracts. The F. verna extracts were used for obtaining β-cyclodextrin complexes; these were analyzed by scanning electron microscopy and Karl Fischer water titration; spectrophotometry was used in order to quantifying the flavonoids and evaluates the antioxidant activity. A higher concentration of flavonoids of 0.5% was determined in complexes obtained by crystallisation method, while only a half of this value was calculated for kneading method. The antioxidant activity of these complexes was correlated with the flavonoid content and this parameter reveals possible controlled release properties. Conclusions The flavonoid content of F. verna Huds. from the West side of Romania (Banat county is approximately the same in flowers and leaves, being situated at a medium value among other

  6. 76 FR 47226 - Notice of HUD-Held Multifamily Loan Sale (MLS 2011-2)

    Science.gov (United States)

    2011-08-04

    ...., Washington, DC 20410-8000; telephone number 202- 708-2625, extension 3927. Hearing- or speech-impaired... with HUD, unless such default or violation is cured on or before June 30, 2011; Freedom of Information... Freedom of Information Act and all regulations promulgated thereunder. Scope of Notice This notice applied...

  7. 78 FR 59890 - Qualified Mortgage Definition for HUD Insured and Guaranteed Single Family Mortgages

    Science.gov (United States)

    2013-09-30

    ... construction and policy implications demonstrates that there are sound reasons for adopting either... borrower except for minor adjustments.\\16\\ \\16\\ Handbook 4155.1, Ch. 6, Sec. C (Mortgage Credit Analysis....gov/hudportal/HUD?src=/program_offices/administration/hudclips/handbooks/hsgh/4155.1 . Requiring...

  8. 24 CFR 1000.56 - How are NAHASDA funds paid by HUD to recipients?

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false How are NAHASDA funds paid by HUD to recipients? 1000.56 Section 1000.56 Housing and Urban Development Regulations Relating to Housing..., DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT NATIVE AMERICAN HOUSING ACTIVITIES General § 1000.56 How are...

  9. 75 FR 41875 - Technical Processing Requirements for Multifamily Project Mortgage Insurance

    Science.gov (United States)

    2010-07-19

    ... is used to determine if key principals are acceptable and have the ability to manage the development... principals are acceptable and have the ability to manage the development, construction, completion, and... Requirements for Multifamily Project Mortgage Insurance AGENCY: Office of the Chief Information Officer, HUD...

  10. Development Of HUD Combiner For Automotive Windshield Application

    Science.gov (United States)

    Hattori, Akimasa; Makita, Kensuke; Okabayashi, Shigeru

    1989-12-01

    The head-up display system (HUM) has been developed for the windshield of Nissan Motor's passenger car, '88 model of Silvia (240SX) and '89 model of Maxima. HUD consists of a projector with high brightness VFT and a combiner which is a light-selective reflective film applied on the surface of ' e windshield. The system provides nice display legibility of speed in a three-digit reap at the position more than one meter far from driver's eye even under the bright sunlight. In this report, we present the optical properties and manufacturing process of the advanced combiner. The combiner has to have high transmittance as well as high reflectance so that a driver can see both foreground object and display reading at the same time. The optical design for the combiner is based on the concepts: (a) Visible light transmittance has to be 70% or more in accordance with a legal requirement, and (b) taking both peak wavelengths of Vim' and sensitivity characteristics of human eyes into consideration, 530nm of wave length is chosen as a reflective light. The combiner consists of a dielectric thin layer of Ti02-Si02 system. Its basic structure is decided by simulation with matrix method of the resultant waves. The coating film is applied on the restricted area of the forth surface of laminated windshield by newly developed solgel printing process using a metal alkoxide solution with a relatively long storage life.

  11. 24 CFR 850.151 - Project restrictions.

    Science.gov (United States)

    2010-04-01

    ... be done in accordance with the HUD-approved Affirmative Fair Housing Marketing Plan, Form HUD-935.2... affirmative fair housing marketing objectives and the owner's HUD-approved AFHM Plan. With respect to any... tenant (for example, by designating another comparable unit as a low-income unit), the owner may continue...

  12. Selecting users for participation in IT projects

    DEFF Research Database (Denmark)

    Rasmussen, Rasmus; Christensen, Anders S.; Fjeldsted, Tobias

    2011-01-01

    The selection of users for participation in IT projects involves trade-offs between multiple criteria, one of which is selecting a representative cross-section of users. This criterion is basic because trading it for other criteria means basing designs on information biased toward some user groups...... at the expense of others. Based on interviews in development and customer organizations we find that their criteria for user selection favour persons who can contribute to the progress of the IT project over persons who are representative of the full range of users. A highly valued contribution from...... participating users is the ability to advocate a vision for the system and champion its organizational implementation. A survey in one customer organization shows that respondents’ personal traits explain up to 31% of the variation in their experience of aspects of the usability of a recently introduced system...

  13. Ophrys apifera Huds. (Orchidaceae, a new orchid species to the flora of Poland

    Directory of Open Access Journals (Sweden)

    Osiadacz Barbara

    2014-12-01

    Full Text Available The paper provides data on the first locality of Ophrys apifera Huds. s. str. in Poland. Information about its geographical distribution and ecological features is given. A newly discovered population, found in a worked-out dolomite quarry near Imielin (Silesian Upland, is described and illustrated, as also, O. apifera is compared with O. insectifera L.

  14. 24 CFR 200.944 - Supplementary specific requirements under the HUD building product standards and certification...

    Science.gov (United States)

    2010-04-01

    ... under the HUD building product standards and certification program for plywood and other performance... product standards and certification program for plywood and other performance rated wood-based structural... building product certification program. In the case of plywood and wood-based structural-use panels...

  15. Understanding the selection processes of public research projects

    NARCIS (Netherlands)

    Materia, V.C.; Pascucci, S.; Kolympiris, C.

    2015-01-01

    This paper analyses factors that affect the funding of agricultural research projects by regional governments and other regional public authorities. We study the selection process of agricultural research projects funded by the emilia Romagna regional government in Italy, which follows funding

  16. Six Sigma Project Selection Using Fuzzy TOPSIS Decision Making Approach

    Directory of Open Access Journals (Sweden)

    Rajeev Rathi

    2015-05-01

    Full Text Available Six Sigma is considered as a logical business strategy that attempts to identify and eliminate the defects or failures for improving the quality of product and processes. A decision on project selection in Six Sigma is always very critical; it plays a key role in successful implementation of Six Sigma. Selection of a right Six Sigma project is essentially important for an automotive company because it greatly influences the manufacturing costs. This paper discusses an approach for right Six Sigma project selection at an automotive industry using fuzzy logic based TOPSIS method. The fuzzy TOPSIS is a well recognized tool to undertake the fuzziness of the data involved in choosing the right preferences. In this context, evaluation criteria have been designed for selection of best alternative. The weights of evaluation criteria are calculated by using the MDL (modified digital logic method and final ranking is calculated through priority index obtained by using fuzzy TOPSIS method. In the selected case study, this approach has rightly helped to identify the right project for implementing Six Sigma for achieving improvement in productivity.

  17. Selecting a Sustainable Disinfection Technique for Wastewater Reuse Projects

    Directory of Open Access Journals (Sweden)

    Jorge Curiel-Esparza

    2014-09-01

    Full Text Available This paper presents an application of the Analytical Hierarchy Process (AHP by integrating a Delphi process for selecting the best sustainable disinfection technique for wastewater reuse projects. The proposed methodology provides project managers a tool to evaluate problems with multiple criteria and multiple alternatives which involve non-commeasurable decision criteria, with expert opinions playing a major role in the selection of these treatment technologies. Five disinfection techniques for wastewater reuse have been evaluated for each of the nine criteria weighted according to the opinions of consulted experts. Finally, the VIKOR method has been applied to determine a compromise solution, and to establish the stability of the results. Therefore, the expert system proposed to select the optimal disinfection alternative is a hybrid method combining the AHP with the Delphi method and the VIKOR technique, which is shown to be appropriate in realistic scenarios where multiple stakeholders are involved in the selection of a sustainable disinfection technique for wastewater reuse projects.

  18. METHODS OF SELECTING THE EFFECTIVE MODELS OF BUILDINGS REPROFILING PROJECTS

    Directory of Open Access Journals (Sweden)

    Александр Иванович МЕНЕЙЛЮК

    2016-02-01

    Full Text Available The article highlights the important task of project management in reprofiling of buildings. It is expedient to pay attention to selecting effective engineering solutions to reduce the duration and cost reduction at the project management in the construction industry. This article presents a methodology for the selection of efficient organizational and technical solutions for the reconstruction of buildings reprofiling. The method is based on a compilation of project variants in the program Microsoft Project and experimental statistical analysis using the program COMPEX. The introduction of this technique in the realigning of buildings allows choosing efficient models of projects, depending on the given constraints. Also, this technique can be used for various construction projects.

  19. 77 FR 75184 - Notice of Proposed Information Collection: Survey and Collection of Information From HUD Healthy...

    Science.gov (United States)

    2012-12-19

    ... recruitment/enrollment, assessment, interventions, skills training, and community education/outreach in HHI... the proposed collection of information; (3) Enhance the quality, utility, and clarity of the... following information: Title of Proposal: Evaluating Outcomes of HUD's Healthy Homes Demonstration Grants...

  20. 78 FR 17938 - Notice of Proposed Information; Collection for Public Comment; Recordkeeping for HUD's Continuum...

    Science.gov (United States)

    2013-03-25

    ... speech impairments may access this number through TTY by calling the toll-free Federal Information Relay... information: Title of Proposal: Recordkeeping for HUD's Continuum of Care Program. Description of the need for... access to and effective utilization of mainstream programs by homeless individuals and families; and...

  1. 77 FR 41993 - Privacy Act of 1974; Proposed New Routine Use-HUD's Routine Use Inventory

    Science.gov (United States)

    2012-07-17

    ... Identity Management System. (IDMS) formerly Employee Identification File HUD/DEPT-72 Congressional... Office of Management and Budget (OMB), Circular No. A-130, notice is hereby given that the Department of... Representatives, and the Office of Management and Budget (OMB) pursuant to paragraph 4c of Appendix I to OMB...

  2. 24 CFR 203.330 - Definition of delinquency and requirement for notice of delinquency to HUD.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Definition of delinquency and requirement for notice of delinquency to HUD. 203.330 Section 203.330 Housing and Urban Development... and Obligations Default Under Mortgage § 203.330 Definition of delinquency and requirement for notice...

  3. 24 CFR 203.466 - Definition of delinquency and requirement for notice of delinquency to HUD.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Definition of delinquency and requirement for notice of delinquency to HUD. 203.466 Section 203.466 Housing and Urban Development... and Obligations Rehabilitation Loans § 203.466 Definition of delinquency and requirement for notice of...

  4. 77 FR 30307 - Notice of HUD-Held Multifamily and Healthcare Loan Sale (MHLS 2012-2)

    Science.gov (United States)

    2012-05-22

    .... Hearing- or speech-impaired individuals may call 202-708-4594 (TTY). These are not toll-free numbers...-2. Freedom of Information Act Requests HUD reserves the right, in its sole and absolute discretion... disclose pursuant to the Freedom of Information Act and all regulations promulgated thereunder. Scope of...

  5. A Methodology for Collective Evaluation and Selection of Industrial R&D Projects

    OpenAIRE

    Muhittin Oral; Ossama Kettani; Pascal Lang

    1991-01-01

    This paper proposes a methodology for evaluating and selecting R&D projects in a collective decision setting, especially useful at sectorial and national levels. It consists of two major phases: Evaluation and Selection. The evaluation process repeatedly uses mathematical programming models to determine the "relative values" of a given R&D project from the viewpoint of the other R&D projects. The selection process of R&D projects is based on these "relative values" and is done through a model...

  6. Procurement selection criteria for projects in the public sector: evidence from Nigeria

    Directory of Open Access Journals (Sweden)

    Richard Ajayi Jimoh

    2016-12-01

    Full Text Available The selection of suitable procurement practice for construction projects is a very complex and demanding tasks for stakeholders in the construction industry. In spite of the overabundance of techniques and tools accessible to the stakeholders in selecting an appropriate procurement method, clients are faced with the decision as to which of the selection criteria can be adopted for a given construction project to achieve project goals and objectives. This paper focused on evaluating the existing procurement methods being practised in the Nigerian construction industry with a view to identifying and establishing the parameters for selection that will improve contract delivery systems. In this research, quantitative approach was used to collect data from 420 contractors, consultants and clients based in the Federal Capital Territory, Abuja where large numbers of building projects are being procured. The findings revealed six most commonly considered criteria and deduced that, the quality, cost and duration of the project determines the type of procurement method to adopt. It is therefore stated that in selecting any particular procurement method for building construction projects, the complexity of such project should be clearly defined and the other performance indicators be given adequate consideration for a successful project delivery that will enhance the achievement of the client’s goal.

  7. Project governance: selected South African government experiments

    Directory of Open Access Journals (Sweden)

    G. van der Walt

    2008-07-01

    Full Text Available Some form of accountability and power structure binds all organisations. Such structures are typically referred to as the “governance” structure of the organisation. In organisations that have relatively mature project applications and methodologies in place, governance mechanisms are established on more permanent bases. With its focus on performance, results and outcomes, project governance establishes decision-making structures, as well as accountability and responsibility mechanisms in public institutions to oversee projects. As government institutions increasingly place emphasis on project applications for policy implementation and service delivery initiatives, mechanisms or structures should be established to facilitate clear interfaces between the permanent organisation and the temporary project organisation. Such mechanisms or structures should enhance the governance of projects, that is, the strategic alignment of projects, the decentralisation of decision- making powers, rapid resource allocation, and the participation of external stakeholders. The purpose of this article is to explore the concept “project governance”, and to highlight examples of project governance as applied in selected government departments in provincial and national spheres. This would enable the establishment of best practice examples and assist to develop benchmarks for effective project applications for service delivery improvement.

  8. 78 FR 5185 - Guidance for Industry and Food and Drug Administration Staff; Humanitarian Use Device (HUD...

    Science.gov (United States)

    2013-01-24

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2011-D-0847] Guidance for Industry and Food and Drug Administration Staff; Humanitarian Use Device (HUD) Designations... public comment ``Draft Guidance for Industry and Food and Drug Administration Staff on Humanitarian Use...

  9. A preliminary study of head-up display assessment techniques. 2: HUD symbology and panel information search time

    Science.gov (United States)

    Guercio, J. G.; Haines, R. F.

    1978-01-01

    Twelve commercial pilots were shown 50 high-fidelity slides of a standard aircraft instrument panel with the airspeed, altitude, ADI, VSI, and RMI needles in various realistic orientations. Fifty slides showing an integrated head-up display (HUD) symbology containing an equivalent number of flight parameters as above (with flight path replacing VSI) were also shown. Each subject was told what flight parameter to search for just before each slide was exposed and was given as long as needed (12 sec maximum) to respond by verbalizing the parameter's displayed value. The results for the 100-percent correct data indicated that: there was no significant difference in mean reaction time (averaged across all five flight parameters) between the instrument panel and HUD slides; and a statistically significant difference in mean reaction time was found in responding to different flight parameters.

  10. 75 FR 54900 - Notice of HUD-Held Multifamily and Healthcare Loan Sale (MHLS 2010-2)

    Science.gov (United States)

    2010-09-09

    ..., extension 3927. Hearing- or speech-impaired individuals may call 202-708-4594 (TTY). These are not toll-free... are eligible to submit bids on the Mortgage Loans in MHLS 2010-2. Freedom of Information Act Requests... right to disclose any information that HUD is obligated to disclose pursuant to the Freedom of...

  11. An analysis of project selection and assignment criteria of Danish tenders in Europe

    Directory of Open Access Journals (Sweden)

    Jasper Kranker Larsen

    2013-12-01

    Full Text Available Public construction agencies are one of the largest developers within the Danish construction industry, where such agencies own and develop new public construction projects. Most of these projects are put out in European tender. This study analyses the selection and assignment criteria employed by these agencies in different types of public sector projects. Some of the objectives pursued by the study include the determination of 1/ the selection and assignment criteria mostly used in Danish public tenders 2/ how different types of projects use selection and assignment criteria in the bidding process, and 3/ any significant difference between the use of selection and assignment criteria in Danish public construction projects. The study uses a quantitative research approach where 157 Danish public tender cases were selected from the European Tenders Electronic Daily database between the period: January 2010 to March 2013. Fisher's Exact Test was conducted to determine if there was any significant use of some selection and assignment criteria. The findings of the study showed that invited tenders with pre-qualification and lowest price in 69.8% of the tenders are the most used selection and assignment criteria, with little regard to project type.

  12. Applying a Hybrid MCDM Model for Six Sigma Project Selection

    Directory of Open Access Journals (Sweden)

    Fu-Kwun Wang

    2014-01-01

    Full Text Available Six Sigma is a project-driven methodology; the projects that provide the maximum financial benefits and other impacts to the organization must be prioritized. Project selection (PS is a type of multiple criteria decision making (MCDM problem. In this study, we present a hybrid MCDM model combining the decision-making trial and evaluation laboratory (DEMATEL technique, analytic network process (ANP, and the VIKOR method to evaluate and improve Six Sigma projects for reducing performance gaps in each criterion and dimension. We consider the film printing industry of Taiwan as an empirical case. The results show that our study not only can use the best project selection, but can also be used to analyze the gaps between existing performance values and aspiration levels for improving the gaps in each dimension and criterion based on the influential network relation map.

  13. Study on the Selection of Equipment Suppliers for Wind Power Generation EPC Project

    Science.gov (United States)

    Yang, Yuanyue; Li, Huimin

    2017-12-01

    In the EPC project, the purchase cost of equipments accounted for about 60% of the total project cost, thus, the selection of equipment suppliers has an important influence on the EPC project. This paper, took EPC project for the phase I engineering of Guizhou Huaxi Yunding wind power plant as research background, constructed the evaluation index system for the selection of equipment suppliers for wind power generation EPC project from multiple perspectives, and introduced matter-element extension evaluation model to evaluate the selection of equipment suppliers for this project from the qualitative and quantitative point of view. The result is consistent with the actual situation, which verifies the validity and operability of this method.

  14. Selecting downscaled climate projections for water resource impacts and adaptation

    Science.gov (United States)

    Vidal, Jean-Philippe; Hingray, Benoît

    2015-04-01

    Increasingly large ensembles of global and regional climate projections are being produced and delivered to the climate impact community. However, such an enormous amount of information can hardly been dealt with by some impact models due to computational constraints. Strategies for transparently selecting climate projections are therefore urgently needed for informing small-scale impact and adaptation studies and preventing potential pitfalls in interpreting ensemble results from impact models. This work proposes results from a selection approach implemented for an integrated water resource impact and adaptation study in the Durance river basin (Southern French Alps). A large ensemble of 3000 daily transient gridded climate projections was made available for this study. It was built from different runs of 4 ENSEMBLES Stream2 GCMs, statistically downscaled by 3 probabilistic methods based on the K-nearest neighbours resampling approach (Lafaysse et al., 2014). The selection approach considered here exemplifies one of the multiple possible approaches described in a framework for identifying tailored subsets of climate projections for impact and adaptation studies proposed by Vidal & Hingray (2014). It was chosen based on the specificities of both the study objectives and the characteristics of the projection dataset. This selection approach aims at propagating as far as possible the relative contributions of the four different sources of uncertainties considered, namely GCM structure, large-scale natural variability, structure of the downscaling method, and catchment-scale natural variability. Moreover, it took the form of a hierarchical structure to deal with the specific constraints of several types of impact models (hydrological models, irrigation demand models and reservoir management models). The implemented 3-layer selection approach is therefore mainly based on conditioned Latin Hypercube sampling (Christierson et al., 2012). The choice of conditioning

  15. 76 FR 12984 - Privacy Act of 1974; Notice of a Computer Matching Program Between HUD and the United States...

    Science.gov (United States)

    2011-03-09

    ... Center, U.S. Department of Veteran Affairs, Bishop Henry Whipple Federal Building, Room 156E, 1 Federal... recipient for VA's data. Notice Procedures: HUD and VA will notify individuals at the time of application...

  16. Proposed Project Selection Method for Human Support Research and Technology Development (HSR&TD)

    Science.gov (United States)

    Jones, Harry

    2005-01-01

    The purpose of HSR&TD is to deliver human support technologies to the Exploration Systems Mission Directorate (ESMD) that will be selected for future missions. This requires identifying promising candidate technologies and advancing them in technology readiness until they are acceptable. HSR&TD must select an may of technology development projects, guide them, and either terminate or continue them, so as to maximize the resulting number of usable advanced human support technologies. This paper proposes an effective project scoring methodology to support managing the HSR&TD project portfolio. Researchers strongly disagree as to what are the best technology project selection methods, or even if there are any proven ones. Technology development is risky and outstanding achievements are rare and unpredictable. There is no simple formula for success. Organizations that are satisfied with their project selection approach typically use a mix of financial, strategic, and scoring methods in an open, established, explicit, formal process. This approach helps to build consensus and develop management insight. It encourages better project proposals by clarifying the desired project attributes. We propose a project scoring technique based on a method previously used in a federal laboratory and supported by recent research. Projects are ranked by their perceived relevance, risk, and return - a new 3 R's. Relevance is the degree to which the project objective supports the HSR&TD goal of developing usable advanced human support technologies. Risk is the estimated probability that the project will achieve its specific objective. Return is the reduction in mission life cycle cost obtained if the project is successful. If the project objective technology performs a new function with no current cost, its return is the estimated cash value of performing the new function. The proposed project selection scoring method includes definitions of the criteria, a project evaluation

  17. 76 FR 4193 - Equal Access to Housing in HUD Programs-Regardless of Sexual Orientation or Gender Identity

    Science.gov (United States)

    2011-01-24

    ... Gender Identity; Proposed Rule #0;#0;Federal Register / Vol. 76, No. 15 / Monday, January 24, 2011...--Regardless of Sexual Orientation or Gender Identity AGENCY: Office of the Secretary, HUD. ACTION: Proposed... individuals and families regardless of sexual orientation or gender identity. DATES: Comment Due Date: March...

  18. The Effects of Head-Up Display (HUD) Pitch Ladder Articulation, Pitch Number Location and Horizon Line Length on Unusual Attitude Recoveries for the F-16

    Science.gov (United States)

    1990-07-01

    No comment . ’D. No comment . E. The best display was the partially articulated HUD. F. Only pitch bars below the horizon should be articulated. G. Fully articulated pitch bars were the best. H. Fully articulated configuration was easiest to quickly determine which direction to the horizon. I. No comment . J. Fully articulated HUD gave instant feedback on which way to pull to the horizon, K. No comment . L. Definite difference using the full articulation. 2. The following zomments are

  19. Site selection for controversial projects: reflections on the MRS experience

    International Nuclear Information System (INIS)

    Sigmon, E.B.; Marland, G.

    1987-01-01

    Projects for waste management, power production, and a host of other socially useful functions frequently falter because of local opposition. Students of the siting dilemma have prescribed accommodation of local interests through negotiation and compensation, but they offer little advice on the site selection itself. The negotiated compensation approach to siting frequently fails because localities refuse to negotiate. The authors argue that methods of site selection and developers' initial stance toward local communities affect communities' propensity to negotiate. Site selection strategies and their influence on project acceptability are examined, using the Department of Energy's Monitored Retrievable Storage proposal as a point of departure. 14 refs

  20. 76 FR 2407 - Notice of Availability: HUD's Fiscal Year (FY) 2010 NOFA for the Capital Fund Education and...

    Science.gov (United States)

    2011-01-13

    ...--Technical Correction and Extension of Deadline Date AGENCY: Office of the Chief Human Capital Officer, HUD... provide early childhood education, adult education, and/or job training programs for public housing... technical correction that makes several corrections and clarification to NOFA. Specifically, the corrected...

  1. Helmet-mounted display requirements: just another head-up display (HUD) or a different animal altogether?

    Science.gov (United States)

    Newman, Richard L.; Haworth, Loran A.

    1994-06-01

    The helmet-mounted display (HMD) presents flight, navigation, and weapon information in the pilot's line of sight. The HMD was developed to allow the pilot to retain aircraft and weapon information while looking off boresight. The present study reviewed the state-of-the-art in HMDs and identified a number of issues applying to HMDs. Several are identical to head-up display (HUD) issues: symbol standardization, excessive clutter, and the need for integration with other cockpit displays and controls. Other issues are unique to the head-mounted display: symbol stabilization, inadequate definitions, undefined symbol drive laws, helmet considerations, and field-of-view (FOV) vs. resolution tradeoff requirements. Symbol stabilization is critical. In the Apache helicopter, the lack of compensation for pilot head motion creates excessive workload during hovering and nap-of-the-earth (NOE) flight. This high workload translates into excessive training requirements. At the same time, misleading symbology makes interpretation of the height of obstructions impossible. The underlying cause is the absence of design criteria for HMDs. The existing military standard does not reflect the current state of technology. In addition, there are inadequate test and evaluation guidelines. The situation parallels the situation for HUDs several years ago.

  2. Strategic project selection based on evidential reasoning approach for high-end equipment manufacturing industry

    Directory of Open Access Journals (Sweden)

    Lu Guangyan

    2017-01-01

    Full Text Available With the rapid development of science and technology, emerging information technologies have significantly changed the daily life of people. In such context, strategic project selection for high-end equipment manufacturing industries faces more and more complexities and uncertainties with the consideration of several complex criteria. For example, a group of experts rather than a single expert should be invited to select strategic project for high-end equipment manufacturing industries and the experts may feel difficulty to express their preferences towards different strategic projects due to their limited cognitive capabilities. In order to handle these complexities and uncertainties, the criteria framework of strategic project selection is firstly constructed based on the characteristics of high-end equipment manufacturing industries and then evidential reasoning (ER approach is introduced in this paper to help experts express their uncertain preferences and aggregate these preferences to generate an appropriate strategic project. A real case of strategic project selection in a high-speed train manufacturing enterprise is investigated to demonstrate the validity of the ER approach in solving strategic project selection problem.

  3. Selection of executors for realization of individual tasks of the project

    Directory of Open Access Journals (Sweden)

    Asanov Askhat

    2017-01-01

    Full Text Available This article deals with the task of selection of executors for the realization of individual tasks of a new project. A short review of approaches to the estimation of personnel based on intellectual methods is provided. Two approaches to the task solution of executors’ selection are reviewed. The first approach allows considering estimation of competence of potential executors and data about projects that have already been realized. These data and requirements to the tasks of new projects are presented with the help of cognitive map with correspondent vertices. In the article, a methodologic example of the suggested approach use is introduced. The second approach suggests the use of Hopfield’s neural network. Neural networks allow using the already available experience of project activities during realization of new projects.

  4. A Multiagent Evolutionary Algorithm for the Resource-Constrained Project Portfolio Selection and Scheduling Problem

    Directory of Open Access Journals (Sweden)

    Yongyi Shou

    2014-01-01

    Full Text Available A multiagent evolutionary algorithm is proposed to solve the resource-constrained project portfolio selection and scheduling problem. The proposed algorithm has a dual level structure. In the upper level a set of agents make decisions to select appropriate project portfolios. Each agent selects its project portfolio independently. The neighborhood competition operator and self-learning operator are designed to improve the agent’s energy, that is, the portfolio profit. In the lower level the selected projects are scheduled simultaneously and completion times are computed to estimate the expected portfolio profit. A priority rule-based heuristic is used by each agent to solve the multiproject scheduling problem. A set of instances were generated systematically from the widely used Patterson set. Computational experiments confirmed that the proposed evolutionary algorithm is effective for the resource-constrained project portfolio selection and scheduling problem.

  5. 76 FR 5819 - Notice of Submission of Proposed Information Collection to OMB; HUD-Owned Real Estate-Dollar Home...

    Science.gov (United States)

    2011-02-02

    ... Proposed Information Collection to OMB; HUD-Owned Real Estate--Dollar Home Sales Program AGENCY: Office of... organizations, and government entities. The sale of these properties under this program makes it possible for... appropriate automated collection techniques or other forms of information technology, e.g., permitting...

  6. Exploring project selection behavior of academic scientists in India

    OpenAIRE

    Anju Chawla

    2007-01-01

    This study is based on retrospective accounts of a stratified sample of about 1,100 academic scien-tists in India on the criteria actually used by them in the choice of research projects. A basic objective is to examine the effects of contextual factors such as academic rank, institutional and disciplinary setting, and sources of research funds on the choice of research projects. A struc-tured questionnaire was used to tap the criteria for project selection. The items were factor-analyzed and...

  7. 24 CFR 1000.118 - What recourse does a recipient have if HUD disapproves a proposal to provide assistance to non...

    Science.gov (United States)

    2010-04-01

    ... housing activity? 1000.118 Section 1000.118 Housing and Urban Development Regulations Relating to Housing... § 1000.118 What recourse does a recipient have if HUD disapproves a proposal to provide assistance to non...

  8. 24 CFR 290.13 - Negotiated sales.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Negotiated sales. 290.13 Section... DEVELOPMENT HUD-OWNED PROPERTIES DISPOSITION OF MULTIFAMILY PROJECTS AND SALE OF HUD-HELD MULTIFAMILY MORTGAGES Disposition of Multifamily Projects § 290.13 Negotiated sales. When HUD conducts a negotiated sale...

  9. Computational Experiment Study on Selection Mechanism of Project Delivery Method Based on Complex Factors

    Directory of Open Access Journals (Sweden)

    Xiang Ding

    2014-01-01

    Full Text Available Project delivery planning is a key stage used by the project owner (or project investor for organizing design, construction, and other operations in a construction project. The main task in this stage is to select an appropriate project delivery method. In order to analyze different factors affecting the PDM selection, this paper establishes a multiagent model mainly to show how project complexity, governance strength, and market environment affect the project owner’s decision on PDM. Experiment results show that project owner usually choose Design-Build method when the project is very complex within a certain range. Besides, this paper points out that Design-Build method will be the prior choice when the potential contractors develop quickly. This paper provides the owners with methods and suggestions in terms of showing how the factors affect PDM selection, and it may improve the project performance.

  10. The process of selecting technology development projects: a practical framework

    NARCIS (Netherlands)

    Herps, Joost M.J.; van Mal, Herman H.; Halman, Johannes I.M.; Martens, Jack H.M.; Borsboom, Ron H.M.

    2003-01-01

    In this article a practical framework is proposed, that can be used to organise the activities related to the selection-process of technology development projects. The framework is based upon recent literature and application at DAF Trucks Company. A technology development project has a long way to

  11. The process of selecting technology development projects : a practical framework

    NARCIS (Netherlands)

    Herps, J.M.J.; Mal, van H.H.; Halman, J.I.M.; Martens, J.H.M.; Borsboom, R.H.M.

    2003-01-01

    In this article a practical framework is proposed, that can be used to organise the activities related to the selection-process of technology development projects. The framework is based upon recent literature and application at DAF Trucks Company. A technology development project has a long way to

  12. 76 FR 66949 - Privacy Act of 1974; Notification of the Establishment of a Privacy Act System of Records, HUD...

    Science.gov (United States)

    2011-10-28

    ...; billing dispute resolution documentation; reconciliation documents; service level agreements; distribution... records in the system: Storage: All data are stored on the production HIAMS database servers. The data are... HUD Integrated Core Financial System. Exemptions from certain provisions of the Act: None. [FR Doc...

  13. 24 CFR 290.15 - Disposition plan.

    Science.gov (United States)

    2010-04-01

    ... DEVELOPMENT HUD-OWNED PROPERTIES DISPOSITION OF MULTIFAMILY PROJECTS AND SALE OF HUD-HELD MULTIFAMILY..., the sales price that is acceptable to HUD, and the assistance that HUD plans to make available to a... plan, the environmental reviews required by 24 CFR part 50. ...

  14. A new locality of orchid Orchis purpurea Huds. in Cieszyn Foothills (Czech Republic

    Directory of Open Access Journals (Sweden)

    Beczała Tomasz

    2016-03-01

    Full Text Available Orchis purpurea Huds. is protected species both in the Czech Republic and Poland. In 2014 a new locality was found in Kojkovice (district Třinec in the Cieszyn Foothils near border with Poland. The only one blooming individual was observed in 2014 and 2015 but it was accompanied by other 6 orchid species, that were much more abundant, as: Orchis pallens, Orchis mascula subsp. signifera, Listera ovata, Platanthera bifolia, Cephalanthera damasonium, Neottia nidus-avis. The Kojkovice forest deserves to be protected area due to abundant occurrence of many orchids.

  15. A proposed selection process in Over-The-Top project portfolio management

    Directory of Open Access Journals (Sweden)

    Jemy Vestius Confido

    2018-05-01

    Full Text Available Purpose: The purpose of this paper is to propose an Over-The-Top (OTT initiative selection process for communication service providers (CSPs entering an OTT business. Design/methodology/approach: To achieve this objective, a literature review was conducted to comprehend the past and current practices of the project (or initiative selection process as mainly suggested in project portfolio management (PPM. This literature was compared with specific situations and the needs of CSPs when constructing an OTT portfolio. Based on the contrast between the conventional project selection process and specific OTT characteristics, a different selection process is developed and tested using group model-building (GMB, which involved an in-depth interview, a questionnaire and a focus group discussion (FGD. Findings: The paper recommends five distinct steps for CSPs to construct an OTT initiative portfolio: candidate list of OTT initiatives, interdependency diagram, evaluation of all interdependent OTT initiatives, evaluation of all non-interdependent OTT initiatives and optimal portfolio of OTT initiatives. Research limitations/implications: The research is empirical, and various OTT services are implemented; the conclusion is derived only from one CSP, which operates as a group. Generalization of this approach will require further empirical tests on different CSPs, OTT players or any firms performing portfolio selection with a degree of interdependency among the projects. Practical implications: Having considered interdependency, the proposed OTT initiative selection steps can be further implemented by portfolio managers for more effective OTT initiative portfolio construction. Originality/value: While the previous literature and common practices suggest ensuring the benefits (mainly financial of individual projects, this research accords higher priority to the success of the overall OTT initiative portfolio and recommends that an evaluation of the overall

  16. EPRtm project experience: selection of partners and supply chain

    International Nuclear Information System (INIS)

    Lorenzo, D. de

    2012-01-01

    With 4 EPR T M units under construction, the new plants to be built in the following years will benefit from the return on experience of the work already performed. The knowledge about licensing processes, detail engineering, supply chain, logistics and on-site work gathered from the Olkiluoto 3 and Flamanville 3 projects has already been used in the Taishan 1 and 2 project, resulting in a project that is on schedule and on budget. This article will show how the advantage of such broad experience gained will be used to benefit future projects to ensure certainty of completion, leaving few and limited unresolved issues even before the beginning of the project. Several areas that are not usually tackled when speaking of a New Build project will be covered by this text from the point of view of a nuclear vendor: Project Partnership Selection and the Gate Review Process applied by AREVA in the supply chain of the main components. (Author)

  17. Selecting Large Portfolios of Social Projects in Public Organizations

    Directory of Open Access Journals (Sweden)

    Igor Litvinchev

    2014-01-01

    Full Text Available We address the portfolio selection of social projects in public organizations considering interdependencies (synergies affecting project funds requirements and tasks. A mixed integer linear programming model is proposed incorporating the most relevant aspects of the problem found in the literature. The model supports both complete (all or nothing and partial (a certain amount from a given interval of funding resource allocation policies. Numerical results for large-scale problem instances are presented.

  18. NPD project portfolio selection using reinvestment strategy in competitive environment

    Directory of Open Access Journals (Sweden)

    Alireza Ghassemi

    2018-01-01

    Full Text Available This study aims to design a new model for selecting most fitting new product development projects in a pool of projects. To catch the best model, we assume new products will be introduced to the competitive markets. Also, we suppose the revenue yielded by completed projects can be reinvested on implementation of other projects. Other sources of financing are borrowing loans from banks and initial capital of the firm. These limited resources determine most evaluated projects to be performed. Several types of interactions among different projects are considered to make the chosen projects more like a portfolio. In addition, some numerical examples from the real world are provided to demonstrate the applicability of the proposed model. These examples show how the particular considerations in the suggested model affect the results.

  19. NASA: Assessments of Selected Large-Scale Projects

    Science.gov (United States)

    2011-03-01

    REPORT DATE MAR 2011 2. REPORT TYPE 3. DATES COVERED 00-00-2011 to 00-00-2011 4. TITLE AND SUBTITLE Assessments Of Selected Large-Scale Projects...Volatile EvolutioN MEP Mars Exploration Program MIB Mishap Investigation Board MMRTG Multi Mission Radioisotope Thermoelectric Generator MMS Magnetospheric...probes designed to explore the Martian surface, to satellites equipped with advanced sensors to study the earth , to telescopes intended to explore the

  20. The red alga Gracilaria verrucosa (Huds.) papens. As an indicator for metal pollution in Thermaikos Gulf (Greece)

    International Nuclear Information System (INIS)

    Malea, P.; Haritonidis, S.; Kevrekidis, T.

    1999-01-01

    Seasonal samplings of the red alga Gracilaria verrucosa (Huds.) Papens., of the sediment and seawater from three stations (Nea Krini, Biamyl, Perea) distributed along the coast of Thermaikos Gulf were made. Iron, Pb, Zn, Cu and Cd concentrations in the alga and sediment after wet digestion and in the salt left after evaporation of the seawater were measured by flameless AAS (Perkin-Elmer HGA 72)

  1. How Do Contractors Select Suppliers for Greener Construction Projects? The Case of Three Swedish Companies

    Directory of Open Access Journals (Sweden)

    Shahin Mokhlesian

    2014-06-01

    Full Text Available There are many studies of contractor selection based on clients and the selection of suppliers by contractors. However, supplier selection specifically related to green construction projects has been much less studied. Green construction differs from conventional construction because of differences in its underlying principles and use of environmentally-friendly materials and technologies. This paper studies how procurers in contractor companies in Sweden adopt green projects and how contractor perception of supplier mastery of green knowledge affects supplier selection. The investigation is based on a set of semi-structured interviews conducted among three large contractors in Sweden. A main finding is that the perceived differences between green and conventional projects do not change supplier selection dramatically. An implication is that “greener projects” is a more appropriate denotation than “green project”. Evidence shows that suppliers’ green knowledge is an important factor in supplier selection, as respondents rated suppliers’ knowledge of green projects as very important, and to fix his, there was a consensus among respondents about the need for close collaboration between contractors and suppliers. To ensure knowledge acquisition from suppliers and to increase their competitive advantage over rivals, contractors collaborate with their suppliers in a partnering setting. It is anticipated that the results of this study will be used to fill the gap in the literature on supplier selection in green projects and can also be used for construction firms contemplating getting involved in green projects.

  2. Influence of Selected Stakeholders of Construction Investment Projects on the Course of Project

    Science.gov (United States)

    Bizon-Górecka, Jadwiga; Górecki, Jarosław

    2017-10-01

    The article presents an entity perspective of the construction investment projects. In a course of the project there are stakeholders who have an indirect influence (e.g. decision-makers in the selection of projects) or a direct influence (e.g. members of the project team). An intuitive opinion about a significant influence of project stakeholders on the project’s course encouraged the authors to undertake a research in this area. The article illustrates the initial phases of the construction project life cycle in a perspective of the entities and, in particular, a role of different stakeholders in making decisions that affect a course of the project. An analysis of the structure of the construction project life cycle makes a substantial involvement of various subjects in the initial phases of the project, i.e. in an initial phase and during a creation of the structures. A key point is to underline the factors of decision-making by the participants of the construction process. It was indicated that the stakeholders have a different impact on the course of the project. In large projects, which have many stakeholders, their role in the implementation of the investment project can vary, depending on the life cycle of the project. They can have positive or negative impacts on achieving the project objectives. The paper presents the results of 100 surveys made among participants of the building processes, executors of the construction projects in the Kuyavian-Pomeranian region. The study was conducted in December 2016 and January 2017. It revealed what is the impact of individual stakeholders of the construction projects on the course of the project. A special attention was paid to a complex relationship between objectives of the project and stakeholders’ goals. A great care to the smallest possible number of risks, which may arise from the different objectives of the project and its stakeholders’ goals, should be focused on the augmentation of correlation of

  3. Project Selection and Transparency Factors in Housing Public-Private Partnerships in Nigeria

    Directory of Open Access Journals (Sweden)

    Eziyi Offia Ibem

    2018-06-01

    Full Text Available The application of Public-Private Partners (PPPs in housing provisioning is on the increase across the world. However, there is a paucity of empirical studies on the specific factors considered at the initiation, and measures taken to ensure transparency at the procurement stages, of PPP housing projects. This study examined project selection factors and transparency measures in PPP housing projects using data sourced from oral interviews with 27 experts in nine PPP housing schemes in Nigeria. Results of the content analysis revealed that the top two selection factors considered by both the public and private sector operators of PPP housing projects in Nigeria are the availability of land and viability of the funding arrangements. Whereas the public-sector partners also consider the availability of competent private sector to deliver the projects, the private developers are concerned with the location of proposed projects. It was also found that the two key measures taken to ensure transparency at the procurement stage of the projects are transparent and competitive bidding and open advertisements of tender opportunities. These imply that before embarking on PPP housing projects, operators should ensure that there is available land in good locations, sound funding arrangements, and measures for achieving transparency in the schemes.

  4. Selective serotonergic excitation of callosal projection neurons

    Directory of Open Access Journals (Sweden)

    Daniel eAvesar

    2012-03-01

    Full Text Available Serotonin (5-HT acting as a neurotransmitter in the cerebral cortex is critical for cognitive function, yet how 5-HT regulates information processing in cortical circuits is not well understood. We tested the serotonergic responsiveness of layer 5 pyramidal neurons (L5PNs of the mouse medial prefrontal cortex (mPFC, and found 3 distinct response types: long-lasting 5-HT1A (1A receptor-dependent inhibitory responses (84% of L5PNs, 5-HT2A (2A receptor-dependent excitatory responses (9%, and biphasic responses in which 2A-dependent excitation followed brief inhibition (5%. Relative to 5-HT-inhibited neurons, those excited by 5-HT had physiological properties characteristic of callosal/commissural (COM neurons that project to the contralateral cortex. We tested whether serotonergic responses in cortical pyramidal neurons are correlated with their axonal projection pattern using retrograde fluorescent labeling of COM and corticopontine-projecting (CPn neurons. 5-HT generated excitatory or biphasic responses in all 5-HT-responsive layer 5 COM neurons. Conversely, CPn neurons were universally inhibited by 5-HT. Serotonergic excitation of COM neurons was blocked by the 2A antagonist MDL 11939, while serotonergic inhibition of CPn neurons was blocked by the 1A antagonist WAY 100635, confirming a role for these two receptor subtypes in regulating pyramidal neuron activity. Selective serotonergic excitation of COM neurons was not layer-specific, as COM neurons in layer 2/3 were also selectively excited by 5-HT relative to their non-labeled pyramidal neuron neighbors. Because neocortical 2A receptors are implicated in the etiology and pathophysiology of schizophrenia, we propose that COM neurons may represent a novel cellular target for intervention in psychiatric disease.

  5. SELECTION OF EFFECTIVE MODELS OF PROJECT IMPLEMENTATION IN A CHANGING FINANCIAL SITUATION

    Directory of Open Access Journals (Sweden)

    Александр Иванович МЕНЕЙЛЮК

    2015-06-01

    Full Text Available The article describes the methods of selecting effective models of construction projects of residential buildings and recommendations for its use. The technique is based on the construction of the models in the program Microsoft Project and analysis using the program COMPEX. Methods can be used not only for building projects. It is especially effective in a variable financial situation.

  6. National inventory of selected biological monitoring programs. Summary report of current or recently completed projects, 1976

    Energy Technology Data Exchange (ETDEWEB)

    Kemp, H. T.

    1976-10-01

    The Inventory has resulted in establishment of a series of data bases containing biological monitoring information of varying types, namely, directory of investigators, record of projects received from mail questionnaire, detailed description of selected biomonitoring projects, and bibliographic citations supporting the projects received. This report contains detailed descriptions of selected biomonitoring projects organized on a state-by-state basis and with appropriate indices.

  7. 76 FR 5518 - Federal Housing Administration (FHA): Refinancing an Existing Cooperative Under Section 207...

    Science.gov (United States)

    2011-02-01

    ... project is for rental or cooperative housing, HUD's regulations limit section 223(f) financing to rental... financing to rental projects. A recent HUD report on U.S. Housing Market Conditions \\2\\ indicated that... provide that ``a mortgage financing the purchase or refinance of an existing rental housing project or...

  8. Projected large flood event sensitivity to projection selection and temporal downscaling methodology

    Energy Technology Data Exchange (ETDEWEB)

    Raff, D. [U.S. Dept. of the Interior, Bureau of Reclamation, Denver, Colorado (United States)

    2008-07-01

    Large flood events, that influence regulatory guidelines as well as safety of dams decisions, are likely to be affected by climate change. This talk will evaluate the use of climate projections downscaled and run through a rainfall - runoff model and its influence on large flood events. The climate spatial downscaling is performed statistically and a re-sampling and scaling methodology is used to temporally downscale from monthly to daily signals. The signals are run through a National Weather Service operational rainfall-runoff model to produce 6-hour flows. The flows will be evaluated for changes in large events at look-ahead horizons from 2011 - 2040, 2041 - 2070, and 2071 - 2099. The sensitivity of results will be evaluated with respect to projection selection criteria and re-sampling and scaling criteria for the Boise River in Idaho near Lucky Peak Dam. (author)

  9. Projected large flood event sensitivity to projection selection and temporal downscaling methodology

    International Nuclear Information System (INIS)

    Raff, D.

    2008-01-01

    Large flood events, that influence regulatory guidelines as well as safety of dams decisions, are likely to be affected by climate change. This talk will evaluate the use of climate projections downscaled and run through a rainfall - runoff model and its influence on large flood events. The climate spatial downscaling is performed statistically and a re-sampling and scaling methodology is used to temporally downscale from monthly to daily signals. The signals are run through a National Weather Service operational rainfall-runoff model to produce 6-hour flows. The flows will be evaluated for changes in large events at look-ahead horizons from 2011 - 2040, 2041 - 2070, and 2071 - 2099. The sensitivity of results will be evaluated with respect to projection selection criteria and re-sampling and scaling criteria for the Boise River in Idaho near Lucky Peak Dam. (author)

  10. Activity modes selection for project crashing through deterministic simulation

    Directory of Open Access Journals (Sweden)

    Ashok Mohanty

    2011-12-01

    Full Text Available Purpose: The time-cost trade-off problem addressed by CPM-based analytical approaches, assume unlimited resources and the existence of a continuous time-cost function. However, given the discrete nature of most resources, the activities can often be crashed only stepwise. Activity crashing for discrete time-cost function is also known as the activity modes selection problem in the project management. This problem is known to be NP-hard. Sophisticated optimization techniques such as Dynamic Programming, Integer Programming, Genetic Algorithm, Ant Colony Optimization have been used for finding efficient solution to activity modes selection problem. The paper presents a simple method that can provide efficient solution to activity modes selection problem for project crashing.Design/methodology/approach: Simulation based method implemented on electronic spreadsheet to determine activity modes for project crashing. The method is illustrated with the help of an example.Findings: The paper shows that a simple approach based on simple heuristic and deterministic simulation can give good result comparable to sophisticated optimization techniques.Research limitations/implications: The simulation based crashing method presented in this paper is developed to return satisfactory solutions but not necessarily an optimal solution.Practical implications: The use of spreadsheets for solving the Management Science and Operations Research problems make the techniques more accessible to practitioners. Spreadsheets provide a natural interface for model building, are easy to use in terms of inputs, solutions and report generation, and allow users to perform what-if analysis.Originality/value: The paper presents the application of simulation implemented on a spreadsheet to determine efficient solution to discrete time cost tradeoff problem.

  11. Polyporus squamosus (Huds. Fr. in the Black Sea Region

    Directory of Open Access Journals (Sweden)

    Sanem Bulam

    2018-03-01

    Full Text Available Polyporus squamosus (Huds. Fr., also named as Aladana, Peri Semeri, Pullu Mantar in varying by localities of Turkey, is an edible wild mushroom species widely existed in the mycobiota of the Black Sea Region. It has not been sold in the local markets. The public recognition of this mushroom may change locally in the Black Sea Region. It is widely consumed by the people in some parts of the region. It is usually appeared in the nature during May-September on the logs, dead and living trunks of the deciduous trees. Following the rainy period, it grows so fast and can produce a few kilograms fruit body within a short period. It is delicious and precious as much as meat for the nutritional value, especially during early growth stage. In this review, general knowledge on the morphological and ecological characteristics, nutritional value and medicinal properties of P. squamosus mushroom and some study results on the domestication of this mushroom have been presented in order to improve the public awareness and its consumption.

  12. A Study on Site Selecting for National Project including High Level Radioactive Waste Disposal

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Kilyoo [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2016-10-15

    Many national projects are stopped since sites for the projects are not determined. The sites selections are hold by NIMBY for unpleasant facilities or by PYMFY for preferable facilities among local governments. The followings are the typical ones; NIMBY projects: high level radioactive waste disposal, THAAD, Nuclear power plant(NPP), etc. PIMFY projects: South-east new airport, KTX station, Research center for NPP decommission, etc. The site selection for high level radioactive waste disposal is more difficult problem, and thus government did not decide and postpone to a dead end street. Since it seems that there is no solution for site selection for high level radioactive waste disposal due to NIMBY among local governments, a solution method is proposed in this paper. To decide a high level radioactive waste disposal, the first step is to invite a bid by suggesting a package deal including PIMFY projects such as Research Center for NPP decommission. Maybe potential host local governments are asked to submit sealed bids indicating the minimum compensation sum that they would accept the high level radioactive waste disposal site. If there are more than one local government put in a bid, then decide an adequate site by considering both the accumulated PESS point and technical evaluation results. By considering how fairly preferable national projects and unpleasant national projects are distributed among local government, sites selection for NIMBY or PIMFY facilities is suggested. For NIMBY national projects, risk, cost benefit analysis is useful and required since it generates cost value to be used in the PESS. For many cases, the suggested method may be not adequate. However, similar one should be prepared, and be basis to decide sites for NIMBY or PIMFY national projects.

  13. Minimizing Project Cost by Integrating Subcontractor Selection Decisions with Scheduling

    Science.gov (United States)

    Biruk, Sławomir; Jaśkowski, Piotr; Czarnigowska, Agata

    2017-10-01

    Subcontracting has been a worldwide practice in the construction industry. It enables the construction enterprises to focus on their core competences and, at the same time, it makes complex project possible to be delivered. Since general contractors bear full responsibility for the works carried out by their subcontractors, it is their task and their risk to select a right subcontractor for a particular work. Although subcontractor management has been admitted to significantly affect the construction project’s performance, current practices and past research deal with subcontractor management and scheduling separately. The proposed model aims to support subcontracting decisions by integrating subcontractor selection with scheduling to enable the general contractor to select the optimal combination of subcontractors and own crews for all work packages of the project. The model allows for the interactions between the subcontractors and their impacts on the overall project performance in terms of cost and, indirectly, time and quality. The model is intended to be used at the general contractor’s bid preparation stage. The authors claim that the subcontracting decisions should be taken in a two-stage process. The first stage is a prequalification - provision of a short list of capable and reliable subcontractors; this stage is not the focus of the paper. The resulting pool of available resources is divided into two subsets: subcontractors, and general contractor’s in-house crews. Once it has been defined, the next stage is to assign them to the work packages that, bound by fixed precedence constraints, form the project’s network diagram. Each package is possible to be delivered by the general contractor’s crew or some of the potential subcontractors, at a specific time and cost. Particular crews and subcontractors can be contracted more than one package, but not at the same time. Other constraints include the predefined project completion date (the project is

  14. New Method of Selecting Efficient Project Portfolios in the Presence of Hybrid Uncertainty

    Directory of Open Access Journals (Sweden)

    Bogdan Rębiasz

    2016-01-01

    Full Text Available A new methods of selecting efficient project portfolios in the presence of hybrid uncertainty has been presented. Pareto optimal solutions have been defined by an algorithm for generating project portfolios. The method presented allows us to select efficient project portfolios taking into account statistical and economic dependencies between projects when some of the parameters used in the calculation of effectiveness can be expressed in the form of an interactive possibility distribution and some in the form of a probability distribution. The procedure for processing such hybrid data combines stochastic simulation with nonlinear programming. The interaction between data are modeled by correlation matrices and the interval regression. Economic dependences are taken into account by the equations balancing the production capacity of the company. The practical example presented indicates that an interaction between projects has a significant impact on the results of calculations. (original abstract

  15. 24 CFR 1000.108 - How is HUD approval obtained by a recipient for housing for non low-income Indian families and...

    Science.gov (United States)

    2010-04-01

    ... recipient for housing for non low-income Indian families and model activities? 1000.108 Section 1000.108... AMERICAN HOUSING ACTIVITIES Affordable Housing Activities § 1000.108 How is HUD approval obtained by a.... Assistance to non low-income Indian families must be in accordance with § 1000.110. Proposals may be...

  16. Reduce blurring and distortion in a projection type virtual image display using integrated small optics

    Science.gov (United States)

    Hasegawa, Tatsuya; Yendo, Tomohiro

    2015-03-01

    Head Up Display (HUD) is being applied to automobile. HUD displays information as far virtual image on the windshield. Existing HUD usually displays planar information. If the image corresponding to scenery on the road like Augmented Reality (AR) is displayed on the HUD, driver can efficiently get the information. To actualize this, HUD covering large viewing field is needed. However existing HUD cannot cover large viewing field. Therefore we have proposed system consisting of projector and many small diameter convex lenses. However observed virtual image has blurring and distortion . In this paper, we propose two methods to reduce blurring and distortion of images. First, to reduce blurring of images, distance between each of screen and lens comprised in lens array is adjusted. We inferred from the more distant the lens from center of the array is more blurred that the cause of blurring is curvature of field of lens in the array. Second, to avoid distortion of images, each lens in the array is curved spherically. We inferred from the more distant the lens from center of the array is more distorted that the cause of distortion is incident angle of ray. We confirmed effectiveness of both methods.

  17. SELECTING WORKING TEAMS FOR INFORMATION TECHNOLOGY OUTSOURCING PROJECTS THROUGH A COMBINATION OF METHODOLOGIES

    Directory of Open Access Journals (Sweden)

    María Alejandra Castellini

    Full Text Available ABSTRACT This paper deals with a problem that Information Technology outsourcing suppliers generally face when selecting a working team technically capable for specific roles in software development projects. A combination of methodologies, interactively integrated, is proposed. They are Soft System Methodology to structure the problem, Repertory Grid for individual interviews and elicitation of the selection criteria, DRV Processes to assess the candidates and to generate knowledge and consensus on the selection process and Linear Programming to assign people to each position. This multimethodology allowed finding a more comprehensive solution than that initially requested by the company, since it helped to establish the necessary transformations for the selection model to operate in the right way, set the competencies to be considered as selection criteria, develop a consensus estimate of the weighted criteria, and award global values to candidates, optimizing the assignment of roles in the group for the project.

  18. Project evaluation and selection using fuzzy Delphi method and zero - one goal programming

    Science.gov (United States)

    Alias, Suriana; Adna, Nofarziah; Arsad, Roslah; Soid, Siti Khuzaimah; Ali, Zaileha Md

    2014-12-01

    Project evaluation and selection is a factor affecting the impotence of board director in which is trying to maximize all the possible goals. Assessment of the problem occurred in organization plan is the first phase for decision making process. The company needs a group of expert to evaluate the problems. The Fuzzy Delphi Method (FDM) is a systematic procedure to evoke the group's opinion in order to get the best result to evaluate the project performance. This paper proposes an evaluation and selection of the best alternative project based on combination of FDM and Zero - One Goal Programming (ZOGP) formulation. ZOGP is used to solve the multi-criteria decision making for final decision part by using optimization software LINDO 6.1. An empirical example on an ongoing decision making project in Johor, Malaysia is implemented for case study.

  19. Ecological review of black-grass (Alopecurus myosuroides Huds. propagation abilities in relationship with herbicide resistance

    Directory of Open Access Journals (Sweden)

    Maréchal, PY.

    2012-01-01

    Full Text Available Alopecurus myosuroides Huds. (black-grass has always been a major concern for cereal growers, and the development of herbicide resistance does not improve the situation. This review article summarizes the different traits involved in the dispersal pattern of herbicide resistant black-grass individuals within a susceptible field population. Therefore, the whole life cycle of black-grass is depicted from the seed to the seed. From the early vegetative development to the seed falling, every stage is described, taking into account how herbicide resistance can influence or exert a different impact compared to susceptible plants.

  20. Ready to Retrofit: The Process of Project Team Selection, Building Benchmarking, and Financing Commercial Building Energy Retrofit Projects

    Energy Technology Data Exchange (ETDEWEB)

    Sanders, Mark D. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Parrish, Kristen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Mathew, Paul [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2012-05-01

    This guide presents a process for three key activities for the building owner in preparing to retrofit existing commercial buildings: selecting project teams, benchmarking the existing building, and financing the retrofit work. Although there are other essential steps in the retrofit process, the three activities presented in this guide are the critical elements where the building owner has the greatest influence on the outcome of the project.

  1. 24 CFR 290.9 - Setting rental rates.

    Science.gov (United States)

    2010-04-01

    ... energy-conservative household of modest circumstances consistent with the requirement of a safe, sanitary... by tenants—(i) In subsidized projects. (A) For families residing in subsidized projects, when HUD becomes MIP or owner, HUD will request an income certification from each family as soon as practicable...

  2. A process for selection and training of super-users for ERP implementation projects

    DEFF Research Database (Denmark)

    Danielsen, Peter; Sandfeld Hansen, Kenneth; Helt, Mads

    2017-01-01

    The concept of super-users as a means to facilitate ERP implementation projects has recently taken a foothold in practice, but is still largely overlooked in research. In particular, little is known about the selection and training processes required to successfully develop skilled super-users in......The concept of super-users as a means to facilitate ERP implementation projects has recently taken a foothold in practice, but is still largely overlooked in research. In particular, little is known about the selection and training processes required to successfully develop skilled super...

  3. On quantifying uncertainty for project selection: the case of renewable energy sources' investment

    International Nuclear Information System (INIS)

    Kirytopoulos, Konstantinos; Rentizelas, Athanassios; Tziralis, Georgios

    2006-01-01

    The selection of a project among different alternatives, considering the limited resources of a company (organisation), is an added value process that determines the prosperity of an undertaken project (investment). This applies also to the 'boming' Renewable Energy Sector, especially under the circumstances established by the recent activation of the Kyoto protocal and by the plethora of available choices for renewable energy sources (RES) projjects. The need for a reliable project selection method among the various alternatives is, therefore, highlighted and, in this context, the paper proposes the NPV function as one of possible criteria for the selection of a RES project. Furthermore, it differentiates from the typical NPV calculation process by adding the concept of a probabilistic NPV approach through Monte Carlo simulation. Reality is non-deterministic, so any attempt of modelling it by using a deterministic approach is by definition erroneous. The paper ultimately proposes a process of substituting the point with a range estimation, capable of quantifying the various uncertainty factors and in this way elucidate the accomplishment possibilities of eligible scenarious. The paper is enhanced by case study showing how the proposed method can be practically applied to support the investment decision, thus enabling the decision makers to judge its effectiveness and usefulness.(Author)

  4. An analysis of project selection and assignment criteria of danish tenders in europe

    DEFF Research Database (Denmark)

    Larsen, Jesper Kranker; Ussing, Lene Faber; Brunø, Thomas Ditlev

    2013-01-01

    , and 3/ any significant difference between the use of selection and assignment criteria in Danish public construction projects. The study uses a quantitative research approach where 157 Danish public tender cases were selected from the European Tenders Electronic Daily database between the period...

  5. Project Selection in the Design Studio: Absence of Learning Environments

    Science.gov (United States)

    Basa, Inci

    2010-01-01

    Project selection is an essential matter of design teaching. Based on observations of a specific curriculum, the author claims that a wide repertoire of subjects including offices, restaurants, hotels, and other public places are used to prepare design students, but that schools and other "learning environments/ schools" are similarly…

  6. The ENTRIA project. Selected disciplinary and interdisciplinary research topics

    International Nuclear Information System (INIS)

    Roehlig, Klaus-Juergen; Hocke, Peter; Walther, Clemens

    2015-01-01

    ENTRIA (''Disposal Options for Radioactive Residues: Interdisciplinary Analyses and Development of Evaluation Principles'', www.entria.de) is a joint research project carried out by twelve departments and institutes from German universities and major research institutions and one partner from Switzerland. It is financed by the German Ministry of Education and Research (BMBF). Scientists representing natural sciences, civil engineering, philosophy, law, social and political sciences, and technology assessment carry out disciplinary and interdisciplinary research addressing three options to manage especially high-level radioactive waste: - Final disposal in deep geological formations without any arrangements for retrieval, - disposal in deep geological formations with arrangements for monitoring and retrieval, and - (prolonged) surface (or near-surface) storage. In the paper, the following selected research topics - both disciplinary and interdisciplinary - are briefly introduced in order to provide an impression of the project scope: - Surface storage, - reference concepts for emplacement in deep geological formations with retrievability and monitoring, - radiation exposure and justification of measures, - interdisciplinary perspectives on dose limits, - comparative studies on nuclear waste governance, - nuclear waste governance in Switzerland, - public involvement and the German Site Selection Act, and - citizens' jury.

  7. Hybrid Multicriteria Group Decision Making Method for Information System Project Selection Based on Intuitionistic Fuzzy Theory

    Directory of Open Access Journals (Sweden)

    Jian Guo

    2013-01-01

    Full Text Available Information system (IS project selection is of critical importance to every organization in dynamic competing environment. The aim of this paper is to develop a hybrid multicriteria group decision making approach based on intuitionistic fuzzy theory for IS project selection. The decision makers’ assessment information can be expressed in the form of real numbers, interval-valued numbers, linguistic variables, and intuitionistic fuzzy numbers (IFNs. All these evaluation pieces of information can be transformed to the form of IFNs. Intuitionistic fuzzy weighted averaging (IFWA operator is utilized to aggregate individual opinions of decision makers into a group opinion. Intuitionistic fuzzy entropy is used to obtain the entropy weights of the criteria. TOPSIS method combined with intuitionistic fuzzy set is proposed to select appropriate IS project in group decision making environment. Finally, a numerical example for information system projects selection is given to illustrate application of hybrid multi-criteria group decision making (MCGDM method based on intuitionistic fuzzy theory and TOPSIS method.

  8. 24 CFR 241.800 - Definitions.

    Science.gov (United States)

    2010-04-01

    ... SUPPLEMENTARY FINANCING FOR INSURED PROJECT MORTGAGES Contract Rights and Obligations-Multifamily Projects Without a HUD-Insured or HUD-Held Mortgage § 241.800 Definitions. All of the definitions contained in... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Definitions. 241.800 Section 241...

  9. 76 FR 45281 - Notice of Submission of Proposed Information Collection to OMB; Public Housing Admissions...

    Science.gov (United States)

    2011-07-28

    ... project development is done in accordance with State laws and HUD requirements. The forms are prepared by a general contractor constructing a public housing development under the conventional bid method in... work for project development is done in accordance with State laws and HUD requirements. The forms are...

  10. Generation IV and transmutation materials (GETMAT) project: First assessment of selected results

    International Nuclear Information System (INIS)

    Fazio, Concetta; Serrano, Marta; Gessi, Alessandro; Henry, Jean; Malerba, Lorenzo

    2015-01-01

    The Generation IV and Transmutation Material (GETMAT) project has been initiated within the 7. EURATOM framework programme with the objective to support the development of innovative reactor designs. Emphasis has been put on the investigation, both in the theoretical and experimental domains, of selected material properties that are cross-cutting among the various Generation IV and Transmutation systems. The selection of the properties to be investigated has been performed by identifying relevant conditions of key components as cores and primary systems. Moreover, taking into account the envisaged conditions of these components it turned out that innovative materials might be a better choice with respect to conventional nuclear grade steels. Therefore, ODS alloys and 9-12 Cr Ferritic/Martensitic (F/M) steels have been selected as reference for the GETMAT project. The R and D activities have been focused on basic characterisation of ODS alloys produced ad hoc for the project and on an extensive PIE programme of F/M steels irradiated in previous programmes. Finally, first principle modelling studies to explain irradiation hardening and embrittlement of F/M alloys were an additional important task. The objective of this manuscript is to make a first assessment of the results obtained within GETMAT. (authors)

  11. Selecting Health Care Improvement Projects: A Methodology Integrating Cause-and-Effect Diagram and Analytical Hierarchy Process.

    Science.gov (United States)

    Testik, Özlem Müge; Shaygan, Amir; Dasdemir, Erdi; Soydan, Guray

    It is often vital to identify, prioritize, and select quality improvement projects in a hospital. Yet, a methodology, which utilizes experts' opinions with different points of view, is needed for better decision making. The proposed methodology utilizes the cause-and-effect diagram to identify improvement projects and construct a project hierarchy for a problem. The right improvement projects are then prioritized and selected using a weighting scheme of analytical hierarchy process by aggregating experts' opinions. An approach for collecting data from experts and a graphical display for summarizing the obtained information are also provided. The methodology is implemented for improving a hospital appointment system. The top-ranked 2 major project categories for improvements were identified to be system- and accessibility-related causes (45%) and capacity-related causes (28%), respectively. For each of the major project category, subprojects were then ranked for selecting the improvement needs. The methodology is useful in cases where an aggregate decision based on experts' opinions is expected. Some suggestions for practical implementations are provided.

  12. Selection of Investment Projects by Monte Carlo Method in Risk Condition

    Directory of Open Access Journals (Sweden)

    M. E.

    2017-12-01

    Full Text Available The Monte Carlo method (also known as the Monte Carlo simulation was proposed by Nicholas Metropolis, S. Ulam and Jhon Von Neiman in 50-th years of the past century. The method can be widely applied to analysis of investment projects due to the advantages recognized both by practitioners and the academic community. The balance model of a project with discounted financial flows has been implemented for Microsoft Excel and Google Docs spread-sheet solutions. The Monte Carlo method for project with low and high correlated net present value (NPV parameters in the environment of the electronic tables of MS Excel/Google Docs. A distinct graduation of risk was identified. A necessity of account of correlation effects and the use of multivariate imitation during the project selection has been demonstrated.

  13. 24 CFR 886.102 - Definitions.

    Science.gov (United States)

    2010-04-01

    ... SUPPORTIVE HOUSING FOR THE ELDERLY PROGRAM AND SECTION 811 SUPPORTIVE HOUSING FOR PERSONS WITH DISABILITIES... for Projects With HUD-Insured and HUD-Held Mortgages § 886.102 Definitions. The terms Fair Market Rent...-held purchase money mortgage; or a project for the elderly financed under section 202 of the Housing...

  14. A Framework for Six Sigma Project Selection in Higher Educational Institutions, Using a Weighted Scorecard Approach

    Science.gov (United States)

    Holmes, Monica C.; Jenicke, Lawrence O.; Hempel, Jessica L.

    2015-01-01

    Purpose: This paper discusses the importance of the Six Sigma selection process, describes a Six Sigma project in a higher educational institution and presents a weighted scorecard approach for project selection. Design/Methodology/Approach: A case study of the Six Sigma approach being used to improve student support at a university computer help…

  15. A CONCEPTUAL MODEL FOR IMPROVED PROJECT SELECTION AND PRIORITISATION

    Directory of Open Access Journals (Sweden)

    P. J. Viljoen

    2012-01-01

    Full Text Available

    ENGLISH ABSTRACT: Project portfolio management processes are often designed and operated as a series of stages (or project phases and gates. However, the flow of such a process is often slow, characterised by queues waiting for a gate decision and by repeated work from previous stages waiting for additional information or for re-processing. In this paper the authors propose a conceptual model that applies supply chain and constraint management principles to the project portfolio management process. An advantage of the proposed model is that it provides the ability to select and prioritise projects without undue changes to project schedules. This should result in faster flow through the system.

    AFRIKAANSE OPSOMMING: Prosesse om portefeuljes van projekte te bestuur word normaalweg ontwerp en bedryf as ’n reeks fases en hekke. Die vloei deur so ’n proses is dikwels stadig en word gekenmerk deur toue wat wag vir besluite by die hekke en ook deur herwerk van vorige fases wat wag vir verdere inligting of vir herprosessering. In hierdie artikel word ‘n konseptuele model voorgestel. Die model berus op die beginsels van voorsieningskettings sowel as van beperkingsbestuur, en bied die voordeel dat projekte geselekteer en geprioritiseer kan word sonder onnodige veranderinge aan projekskedules. Dit behoort te lei tot versnelde vloei deur die stelsel.

  16. Application of Systems Engineering to U.S. Department of Energy Privatization Project Selection at the Hanford Nuclear Reservation

    International Nuclear Information System (INIS)

    Layman, John Scott

    1999-01-01

    The privatization efforts at the U.S. Department of Energy's Hanford Nuclear Reservation have been very successful primarily due to a disciplined process for project selection and execution. Early in the development of Privatization at Hanford, the Department of Energy determined that a disciplined alternatives generation and analysis (AGA) process would furnish the candidate projects with the best probability for success. Many factors had to be considered in the selection of projects. Westinghouse Hanford Company was assigned to develop this process and facilitate the selection of the first round of candidate privatization projects. Team members for the AGA process were assembled from all concerned organizations and skill groups. Among the selection criteria were legal, financial and technical considerations which had to be weighed

  17. 24 CFR 1000.420 - May grants made by HUD under section 603 of NAHASDA be used to pay net interest costs incurred...

    Science.gov (United States)

    2010-04-01

    ... section 603 of NAHASDA be used to pay net interest costs incurred when issuing notes or other obligations... Activities § 1000.420 May grants made by HUD under section 603 of NAHASDA be used to pay net interest costs incurred when issuing notes or other obligations? Yes. Other costs that can be paid using grant funds...

  18. 24 CFR 886.314 - Financial default.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Financial default. 886.314 Section... Program for the Disposition of HUD-Owned Projects § 886.314 Financial default. In the event of a financial default under the project mortgage, HUD shall have the right to make subsequent housing assistance...

  19. 76 FR 31223 - Special Conditions: Bombardier Model BD-700-1A10 and BD-700-1A11 Airplanes, Head-up Display (HUD...

    Science.gov (United States)

    2011-05-31

    .... Per Type Certificate Data Sheet (TCDS) T00003NY, those aircraft models are known under the marketing...., conformal) to the external scene. In addition, the SVS image and the HUD symbols--when considered singly or... external scene. In such cases, these symbols may be displayed but with an altered appearance that makes the...

  20. R and D programmes in Germany. Selection and evaluation of projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    In Germany, budgets for research and development rest on three pillars, which are the federal government, the 16 states, and the civil sector. The total expenditure for 1997 amounted to 83.7 times 1 billion Deutsche marks, and this occupied 2.3 of Germany's GNP (gross national product). National research projects constitute the main stream even today. As for federal government-financed projects, they are managed mainly by BMBF (Federal Ministry of Education, Science, Research, and Technology). There are project carriers as the managerial organizations. Requests for proposals for research and development projects are published in official gazettes and technical journals. Such a project has to contain detailed descriptions regarding the setting of targets, levels of technology, cost accounting, development schedule, history of discovery and development involved, etc. Analyses are conducted into technology, economic risk, market, and environmental impact. Support by the German government for government-related projects is given in compliance with predetermined guidelines. The evaluation and selection of submitted proposals are performed by professionals of the project carrier level. In this paper, explanations are also given about contracts, management of progress, and evaluation. (NEDO)

  1. A model for selecting project team members using multicriteria group decision making

    Directory of Open Access Journals (Sweden)

    Luciana Hazin Alencar

    2010-04-01

    Full Text Available Selecting a project team is a complex multi-criteria decision-making problem. For this reason, one appropriate way to tackle such problems involves the use of multi-criteria decision aid methods. However, most of the decisions taken regarding the selection of project teams are made by a group of people. It is this which changes the focus of the problem by moving from one decision-maker (DM to a group of DMs. Analysis needs to be extended in order to consider the preference structure of each individual group member. In this paper, we present a group decision model for project team selection based on a multi-criteria evaluation of the preferences of a client's representatives. It could be applied to any decision problem since it involves a group of decision makers whose preferences diverge little. An application of the model in order to select consultants for a construction project is presented.A seleção da equipe em um projeto é um problema de decisão multicritério. Uma forma apropriada de tratar tais problemas envolve o uso de métodos de apoio multicritério a decisão. Grande parte desses problemas envolve um grupo de decisores. Dessa forma, há uma mudança no foco da decisão de um decisor para um grupo de decisores. A análise deve ser ampliada no intuito de considerar a estrutura de preferência de cada membro do grupo. Nesse artigo, apresentamos um modelo aplicado à seleção de equipe de um projeto baseado na avaliação multicritério das preferências dos representantes do cliente do projeto. Pode ser aplicado a qualquer problema de decisão desde que envolva um grupo de decisores que tenham pequena divergência em relação às suas preferências. Uma aplicação para seleção de parte da equipe de um projeto de construção é apresentada.

  2. SELECTION OF PROJECT MANAGERS IN CONSTRUCTION FIRMS USING ANALYTIC HIERARCHY PROCESS (AHP AND FUZZY TOPSIS: A CASE STUDY

    Directory of Open Access Journals (Sweden)

    Fatemeh Torfi

    2011-10-01

    Full Text Available Selecting a project manager is a major decision for every construction company. Traditionally, a project manager is selected by interviewing applicants and evaluating their capabilities by considering the special requirements of the project. The interviews are usually conducted by senior managers, and the selection of the best candidate depends on their opinions. Thus, the results may not be completely reliable. Moreover, conducting interviews for a large group of candidates is time-consuming. Thus, there is a need for computational models that can be used to select the most suitable applicant, given the project specifications and the applicants’ details. In this paper, a case study is performed in which a Fuzzy Multiple Criteria Decision Making (FMCDM model is used to select the best candidate for the post of project manager in a large construction firm. First, with the opinions of the senior managers, all the criteria and sub-criteria required for the selection are gathered, and the criteria priorities are qualitatively specified. Then, the applicants are ranked using the Analytic Hierarchy Process (AHP, approximate weights of the criteria, and fuzzy technique for order performance by similarity to ideal solution (TOPSIS. The results of the case study are shown to be satisfactory.

  3. [Phenolic compounds in leaves insertions of Mentha × villosa Huds. cv. Snežná].

    Science.gov (United States)

    Tekeľová, Daniela; Bittner Fialová, Silvia; Tóth, Jaroslav; Czigle, Szilvia

    Lamiaceae plants mostly accumulate active ingredients in their leaves. The subfamily Nepetoideae, including the genus Mentha L., is characterized by the presence of essential oil and antioxidant phenolics, chiefly hydroxycinnamic acids with predominance of rosmarinic acid, and flavonoids. Mentha × piperita and M. spicata are the most broadly used mints in both medicine and industry, while M. x villosa is less known in our country. Herbal drugs in the form of leaves are usually analysed unpartitioned, while single leaves insertions have only been studied occasionally. Therefore, the aim of this work was the quantification of the active compounds content in the leaves pairs of Mentha × villosa Huds. cv. Snežná, using pharmacopoeial methods: total hydroxycinnamic derivatives expressed as rosmarinic acid (THD) and luteolin-type flavonoids. THD content ranged from 6.7% to 9.4% in the leaves pairs water extracts, and from 6.6% to 14.0% in methanol extracts. Flavonoids contents, expressed as luteolin-7-O-glucoside, ranged from 4.0% to 8.8% in water extracts, and from 4.0% to 10.5% in methanol extracts. Antioxidant activity (DPPH) expressed as SC50 ranged from 10.2 to 16.9 μg.ml-1 (drug dry weight) in water extracts, and from 10.7 to 21.6 μg.ml-1 in methanol extracts. The highest content of phenolic compounds as well as the highest antioxidant activity were found to be in the top sheet, while the lowest content of phenolic compounds and lowest antioxidant activity were detected in the leaves of the middle stem part.Key words: Mentha × villosa Huds cv. Snežná hydroxycinnamic derivatives rosmarinic acid luteolin-7-O-glucoside DPPH.

  4. 76 FR 15961 - Funding Priorities and Selection Criterion; Disability and Rehabilitation Research Projects and...

    Science.gov (United States)

    2011-03-22

    ... priorities and a selection criterion for the Disability and Rehabilitation Research Projects and Centers... outcomes for underserved populations; (4) identify research gaps; (5) identify mechanisms of integrating research and practice; and (6) disseminate findings. This notice proposes two priorities and a selection...

  5. Network Insights for Partner Selection in Inter-Organisational New Product Development Projects

    DEFF Research Database (Denmark)

    Ruiz, Pedro Parraguez; Maier, Anja

    2016-01-01

    Selecting partners for new product development (NPD) is an important yet under-supported task. Thispaper focuses on decision-making support for the NPD collaboration stages of partner exploration andsearch. We provide a conceptual framework for a network-based platform to identify potential......: technologicalcloseness, relational closeness, geographical closeness and a set of organisational variables. In order toidentify a subset of new product development partners and aid the selection process, three characteristicsof NPD projects are considered as mediators of those success factors: the desired degree...... and illustrate with examples the networkbasedplatform to explore NPD partners. The developed framework and platform are part of Net-Sights,an ongoing research project to develop open-source decision-support tools for network insights. Thefirst version of this tool will soon be available as an online platform...

  6. 41 CFR 102-74.135 - Who selects construction and alteration projects that are to be performed?

    Science.gov (United States)

    2010-07-01

    ... and alteration projects that are to be performed? 102-74.135 Section 102-74.135 Public Contracts and... construction and alteration projects that are to be performed? The Administrator of General Services selects construction and alteration projects to be performed. ...

  7. Handbook of selected organ doses for projections common in pediatric radiology

    International Nuclear Information System (INIS)

    Rosenstein, M.; Beck, T.J.; Warner, G.G.

    1979-05-01

    This handbook contains data from which absorbed dose (mrad) to selected organs can be estimated for common projections in pediatric radiology. The organ doses are for three reference patients: a newborn (0 to 6 months), a 1-year old child, and a 5-year old child. One intent of the handbook is to permit the user to evaluate the effect on organ dose to these reference pediatric patients as a function of certain changes in technical parameters used in or among facilities. A second intent is to permit a comparison to be made of organ doses as a function of age. This comparison can be extended to a reference adult by referring to the previous Handbook of Selected Organ Doses fo Projections Common in Diagnostic Radiology, FDA 76-8031. Assignment of organ doses to individual pediatric patients using the Handbook data is not recommended unless the physical characteristics of the patient closely correlate with one of the three reference pediatric patients given in Appendix A

  8. Microhabitat selection of Gyrodactylus salaris Malmberg on different salmonids

    DEFF Research Database (Denmark)

    Heinecke, Rasmus Demuth; Martinussen, Torben; Buchmann, Kurt

    2007-01-01

    Parasitten Gyrodactylus salaris vises at formere sig med forskellig succes på forskellige laksefisk. Desuden tager parasitten ophold på forskellige områder på fiskens overflade, hvilket kan afspejle forskellige responsmønstre i fiskens hud.......Parasitten Gyrodactylus salaris vises at formere sig med forskellig succes på forskellige laksefisk. Desuden tager parasitten ophold på forskellige områder på fiskens overflade, hvilket kan afspejle forskellige responsmønstre i fiskens hud....

  9. Preliminary selection criteria for the Yucca Mountain Project waste package container material

    International Nuclear Information System (INIS)

    Halsey, W.G.

    1991-01-01

    The Department of Energy's Yucca Mountain Project (YMP) is evaluating a site at Yucca Mountain in Nevada for construction of a geologic repository for the storage of high-level nuclear waste. Lawrence Livermore National Laboratory's (LLNL) Nuclear Waste Management Project (NWMP) has the responsibility for design, testing, and performance analysis of the waste packages. The design is performed in an iterative manner in three sequential phases (conceptual design, advanced conceptual design, and license application design). An important input to the start of the advanced conceptual design is the selection of the material for the waste containers. The container material is referred to as the 'metal barrier' portion of the waste package, and is the responsibility of the Metal Barrier Selection and Testing task at LLNL. The selection will consist of several steps. First, preliminary, material-independent selection criteria will be established based on the performance goals for the container. Second, a variety of engineering materials will be evaluated against these criteria in a screening process to identify candidate materials. Third, information will be obtained on the performance of the candidate materials, and final selection criteria and quantitative weighting factors will be established based on the waste package design requirements. Finally, the candidate materials will be ranked against these criteria to determine whether they meet the mandated performance requirements, and to provide a comparative score to choose the material for advanced conceptual design activities. This document sets forth the preliminary container material selection criteria to be used in screening candidate materials. 5 refs

  10. [A Method for Selecting Self-Adoptive Chromaticity of the Projected Markers].

    Science.gov (United States)

    Zhao, Shou-bo; Zhang, Fu-min; Qu, Xing-hua; Zheng, Shi-wei; Chen, Zhe

    2015-04-01

    The authors designed a self-adaptive projection system which is composed of color camera, projector and PC. In detail, digital micro-mirror device (DMD) as a spatial light modulator for the projector was introduced in the optical path to modulate the illuminant spectrum based on red, green and blue light emitting diodes (LED). However, the color visibility of active markers is affected by the screen which has unknown reflective spectrum as well. Here active markers are projected spot array. And chromaticity feature of markers is sometimes submerged in similar spectral screen. In order to enhance the color visibility of active markers relative to screen, a method for selecting self-adaptive chromaticity of the projected markers in 3D scanning metrology is described. Color camera with 3 channels limits the accuracy of device characterization. For achieving interconversion of device-independent color space and device-dependent color space, high-dimensional linear model of reflective spectrum was built. Prior training samples provide additional constraints to yield high-dimensional linear model with more than three degrees of freedom. Meanwhile, spectral power distribution of ambient light was estimated. Subsequently, markers' chromaticity in CIE color spaces was selected via maximization principle of Euclidean distance. The setting values of RGB were easily estimated via inverse transform. Finally, we implemented a typical experiment to show the performance of the proposed approach. An 24 Munsell Color Checker was used as projective screen. Color difference in the chromaticity coordinates between the active marker and the color patch was utilized to evaluate the color visibility of active markers relative to the screen. The result comparison between self-adaptive projection system and traditional diode-laser light projector was listed and discussed to highlight advantage of our proposed method.

  11. Evaluation and selection of decision-making methods to assess landfill mining projects.

    Science.gov (United States)

    Hermann, Robert; Baumgartner, Rupert J; Vorbach, Stefan; Ragossnig, Arne; Pomberger, Roland

    2015-09-01

    For the first time in Austria, fundamental technological and economic studies on recovering secondary raw materials from large landfills have been carried out, based on the 'LAMIS - Landfill Mining Austria' pilot project. A main focus of the research - and the subject of this article - was to develop an assessment or decision-making procedure that allows landfill owners to thoroughly examine the feasibility of a landfill mining project in advance. Currently there are no standard procedures that would sufficiently cover all the multiple-criteria requirements. The basic structure of the multiple attribute decision making process was used to narrow down on selection, conceptual design and assessment of suitable procedures. Along with a breakdown into preliminary and main assessment, the entire foundation required was created, such as definitions of requirements to an assessment method, selection and accurate description of the various assessment criteria and classification of the target system for the present 'landfill mining' vs. 'retaining the landfill in after-care' decision-making problem. Based on these studies, cost-utility analysis and the analytical-hierarchy process were selected from the range of multiple attribute decision-making procedures and examined in detail. Overall, both methods have their pros and cons with regard to their use for assessing landfill mining projects. Merging these methods or connecting them with single-criteria decision-making methods (like the net present value method) may turn out to be reasonable and constitute an appropriate assessment method. © The Author(s) 2015.

  12. PROJECT W-551 INTERIM PRETREATMENT SYSTEM TECHNOLOGY SELECTION SUMMARY DECISION REPORT AND RECOMMENDATION

    International Nuclear Information System (INIS)

    CONRAD EA

    2008-01-01

    This report provides the conclusions of the tank farm interim pretreatment technology decision process. It documents the methodology, data, and results of the selection of cross-flow filtration and ion exchange technologies for implementation in project W-551, Interim Pretreatment System. This selection resulted from the evaluation of specific scope criteria using quantitative and qualitative analyses, group workshops, and technical expert personnel

  13. DECISION SUPPORT CONCEPT TO MANAGEMENT OF CONSTRUCTION PROJECTS - PROBLEM OF CONSTRUCTION SITE SELECTION

    Directory of Open Access Journals (Sweden)

    Nikša Jajac

    2013-02-01

    Full Text Available The aim of this paper is to present Decision Support Concept (DSC for management of construction projects. Focus of our research is in application of multicritera methods (MCM to decision making in planning phase of construction projects (related to the problem of construction sites selection. The problem is identified as a significant one from many different aspects such as economic aspect, civil engineering aspect, etc. what indicates the necessity for evaluation of multiple sites by several different criteria. Therefore, DSC for construction site selection based on PROMETHEE method is designed. In order to define the appropriate criteria, their weights and preference functions for the concept, three groups of stakeholders are involved (investors, construction experts and experts for real estate market in its design. AHP method has been used for determination of criteria weights. The model has been tested on the problem of site selection for construction of residential-commercial building in four largest cities in Croatia.

  14. Bibliography of the SAIL Panama Canal Zone Project 2008 : a selected bibliography.

    OpenAIRE

    DeHart, Liz

    2009-01-01

    During the 18th Annual 2008 SAIL meeting at the Smithsonian Tropical Research Institute in Panama, Vielka Chang-Yau, librarian, mentioned the need to digitize and make available through the Aquatic Commons some of the early documents related to the U.S. biological survey of Panama from 1910 to 1912. With the assistance of SAIL, a regional marine librarian’s group, a digital project developed and this select bibliography represents the sources used for the project. It will assist research...

  15. Feature Subset Selection and Instance Filtering for Cross-project Defect Prediction - Classification and Ranking

    Directory of Open Access Journals (Sweden)

    Faimison Porto

    2016-12-01

    Full Text Available The defect prediction models can be a good tool on organizing the project's test resources. The models can be constructed with two main goals: 1 to classify the software parts - defective or not; or 2 to rank the most defective parts in a decreasing order. However, not all companies maintain an appropriate set of historical defect data. In this case, a company can build an appropriate dataset from known external projects - called Cross-project Defect Prediction (CPDP. The CPDP models, however, present low prediction performances due to the heterogeneity of data. Recently, Instance Filtering methods were proposed in order to reduce this heterogeneity by selecting the most similar instances from the training dataset. Originally, the similarity is calculated based on all the available dataset features (or independent variables. We propose that using only the most relevant features on the similarity calculation can result in more accurate filtered datasets and better prediction performances. In this study we extend our previous work. We analyse both prediction goals - Classification and Ranking. We present an empirical evaluation of 41 different methods by associating Instance Filtering methods with Feature Selection methods. We used 36 versions of 11 open source projects on experiments. The results show similar evidences for both prediction goals. First, the defect prediction performance of CPDP models can be improved by associating Feature Selection and Instance Filtering. Second, no evaluated method presented general better performances. Indeed, the most appropriate method can vary according to the characteristics of the project being predicted.

  16. 78 FR 64146 - 30-Day Notice of Proposed Information Collection: Technical Processing Requirements for...

    Science.gov (United States)

    2013-10-25

    ... Information Collection: Technical Processing Requirements for Multifamily Project Mortgage Insurance AGENCY: Office of the Chief Information Officer, HUD. ACTION: Notice. SUMMARY: HUD has submitted the proposed... Information Collection Title of Information Collection: Technical Processing Requirements for Multifamily...

  17. 24 CFR 576.45 - Reallocation of grant amounts; returned or unused amounts.

    Science.gov (United States)

    2010-04-01

    ... with the provisions of § 576.5 of this part. (e) Selection criteria. HUD will award grants under... to be made. (b) FEMA boards. HUD may use State and local boards established under the Emergency Food... will rank the applications using the criteria in paragraph (e) of this section. (7) HUD may make a...

  18. Stakeholder-driven multi-attribute analysis for energy project selection under uncertainty

    International Nuclear Information System (INIS)

    Read, Laura; Madani, Kaveh; Mokhtari, Soroush; Hanks, Catherine

    2017-01-01

    In practice, selecting an energy project for development requires balancing criteria and competing stakeholder priorities to identify the best alternative. Energy source selection can be modeled as multi-criteria decision-maker problems to provide quantitative support to reconcile technical, economic, environmental, social, and political factors with respect to the stakeholders' interests. Decision making among these complex interactions should also account for the uncertainty present in the input data. In response, this work develops a stochastic decision analysis framework to evaluate alternatives by involving stakeholders to identify both quantitative and qualitative selection criteria and performance metrics which carry uncertainties. The developed framework is illustrated using a case study from Fairbanks, Alaska, where decision makers and residents must decide on a new source of energy for heating and electricity. We approach this problem in a five step methodology: (1) engaging experts (role players) to develop criteria of project performance; (2) collecting a range of quantitative and qualitative input information to determine the performance of each proposed solution according to the selected criteria; (3) performing a Monte-Carlo analysis to capture uncertainties given in the inputs; (4) applying multi-criteria decision-making, social choice (voting), and fallback bargaining methods to account for three different levels of cooperation among the stakeholders; and (5) computing an aggregate performance index (API) score for each alternative based on its performance across criteria and cooperation levels. API scores communicate relative performance between alternatives. In this way, our methodology maps uncertainty from the input data to reflect risk in the decision and incorporates varying degrees of cooperation into the analysis to identify an optimal and practical alternative. - Highlights: • We develop an applicable stakeholder-driven framework for

  19. Fringe-period selection for a multifrequency fringe-projection phase unwrapping method

    International Nuclear Information System (INIS)

    Zhang, Chunwei; Zhao, Hong; Jiang, Kejian

    2016-01-01

    The multi-frequency fringe-projection phase unwrapping method (MFPPUM) is a typical phase unwrapping algorithm for fringe projection profilometry. It has the advantage of being capable of correctly accomplishing phase unwrapping even in the presence of surface discontinuities. If the fringe frequency ratio of the MFPPUM is too large, fringe order error (FOE) may be triggered. FOE will result in phase unwrapping error. It is preferable for the phase unwrapping to be kept correct while the fewest sets of lower frequency fringe patterns are used. To achieve this goal, in this paper a parameter called fringe order inaccuracy (FOI) is defined, dominant factors which may induce FOE are theoretically analyzed, a method to optimally select the fringe periods for the MFPPUM is proposed with the aid of FOI, and experiments are conducted to research the impact of the dominant factors in phase unwrapping and demonstrate the validity of the proposed method. Some novel phenomena are revealed by these experiments. The proposed method helps to optimally select the fringe periods and detect the phase unwrapping error for the MFPPUM. (paper)

  20. An ANP-based approach for the selection of photovoltaic solar power plant investment projects

    International Nuclear Information System (INIS)

    Aragones-Beltran, P.; Pastor-Ferrando, J.P.; Rodriguez-Pozo, F.; Chaparro-Gonzalez, F.

    2010-01-01

    In this paper the Analytic Network Process (ANP) is applied to the selection of photovoltaic (PV) solar power projects. These projects follow a long management and execution process from plant site selection to plant start-up. As a consequence, there are many risks of time delays and even of project stoppage. In the case study presented in this paper a top manager of an important Spanish company that operates in the power market has to decide on the best PV project (from four alternative projects) to invest based on risk minimization. The manager identified 50 project execution delay and/or stoppage risks. The influences between the elements of the network (groups of risks and alternatives) were identified and analyzed using the ANP multicriteria decision analysis method. Two different ANP models were used: one hierarchy model (that considers AHP as a particular case of ANP) and one network-based model. The results obtained in each model were compared and analyzed. The main conclusion is that unlike the other models used in the study, the single network model can manage all the information of the real-world problem and thus it is the decision analysis model recommended by the authors. The strengths and weaknesses of ANP as a multicriteria decision analysis tool are also described in the paper. (author)

  1. Characteristics of Criteria for Selecting Investment Projects under Uncertainty

    Directory of Open Access Journals (Sweden)

    Adrian ENCIU

    2011-07-01

    Full Text Available Within financial theory and practice, there are used five main criteria for selecting investment projects: the net present value (NPV criterion, the internal rate of return (IRR criterion, the return term (RT criterion, the profitability ratio (PR criterion and the supplementary return (SR criterion. The assay will emphasize several new properties of said indexes for investment assessment, having as starting point the hypotheses of (approximately normal repartition of cash-flows generated by an investment project. The obtained results point to the fact that the NPV indexes (the analysis of this criterion was carried out in the article “The NPV Criterion for Valuing Investments under Uncertainty”, Daniel Armeanu, Leonard Lache, Economic Computation and Economic Cybernetics Studies and Research no. 4/2009, pp. 133-143, IRR, PR, RT and SR register normal repartitions, therefore simplifying the investment analysis under economic uncertainty, by the capacity of building confidence intervals and assessing probabilities for the inferior limits of said investment assessment indexes.

  2. ISSUES REGARDING THE FINANCIAL FLOW PROJECTIONS IN THE SELECTION OF INVESTMENT PROJECTS

    Directory of Open Access Journals (Sweden)

    Mariana Rodica ŢÎRLEA

    2015-06-01

    Full Text Available For a company, through investment activities, it is followed to either create new abilities or expand the existing abilities, the partial or complete replacement of existing technical base or its modernization. In the condition that it is desired the creation of a technical base, the investment involves the purchase of fixed capital that can materialize in: buildings, special buildings, land, vehicles, facilities, equipment, etc. In terms of expansion and modernization, investment implies the existence of a material base on which should be intervened wholly or partly by its development or modernization. For the selection of investment projects in the context of investment strategy established at enterprise level through a Financial justification and prioritization of investments this should lead to the achievement of the objectives set at its level.

  3. 76 FR 11504 - Notice of Submission of Proposed Information Collection to OMB County Data Record Project

    Science.gov (United States)

    2011-03-02

    ... the ownership, rights and interests of land parcels and HUD is specifically interested in parcel data related to tax assessment, property sale, easement, lien, land use and condition. The objectives of the... received HUD funding. Parcel data is geographically referenced information about the ownership, rights and...

  4. Benchmarking of nuclear reactors selected in the frame of GIF project

    International Nuclear Information System (INIS)

    Azpitarte, O; Villanueva, A; Ramos, R; Ramilo, L; Alvarez, M; Yorio, D; Herrero, V

    2012-01-01

    In this article a comparative assessment of the six reactor concepts selected in the frame of the Generation IV International Forum (GIF) project is presented. The assessment was carried out in the areas of Viability of the concept, Design and nuclear safety, Economics, Sustainability, Proliferation resistance, Nuclear fuel, Reprocessing, Materials and Balance of Plant, by means of qualification of chosen performance indicators (author)

  5. A Hybrid Instance Selection Using Nearest-Neighbor for Cross-Project Defect Prediction

    Institute of Scientific and Technical Information of China (English)

    Duksan Ryu; Jong-In Jang; Jongmoon Baik; Member; ACM; IEEE

    2015-01-01

    Software defect prediction (SDP) is an active research field in software engineering to identify defect-prone modules. Thanks to SDP, limited testing resources can be effectively allocated to defect-prone modules. Although SDP requires suffcient local data within a company, there are cases where local data are not available, e.g., pilot projects. Companies without local data can employ cross-project defect prediction (CPDP) using external data to build classifiers. The major challenge of CPDP is different distributions between training and test data. To tackle this, instances of source data similar to target data are selected to build classifiers. Software datasets have a class imbalance problem meaning the ratio of defective class to clean class is far low. It usually lowers the performance of classifiers. We propose a Hybrid Instance Selection Using Nearest-Neighbor (HISNN) method that performs a hybrid classification selectively learning local knowledge (via k-nearest neighbor) and global knowledge (via na¨ıve Bayes). Instances having strong local knowledge are identified via nearest-neighbors with the same class label. Previous studies showed low PD (probability of detection) or high PF (probability of false alarm) which is impractical to use. The experimental results show that HISNN produces high overall performance as well as high PD and low PF.

  6. 24 CFR 92.62 - Review of program description and certifications.

    Science.gov (United States)

    2010-04-01

    ... and Urban Development HOME INVESTMENT PARTNERSHIPS PROGRAM Allocation Formula Insular Areas Program... description unless the insular area has failed to submit information sufficient to allow HUD to make the... projects or activities in its program description. (c) HOME Investment Partnership Agreement. After HUD...

  7. 78 FR 36564 - 30-Day Notice of Proposed Information Collection: Delegated Processing for Certain 202 Supportive...

    Science.gov (United States)

    2013-06-18

    ... Information Collection: Delegated Processing for Certain 202 Supportive Housing for the Elderly Projects AGENCY: Office of the Chief Information Officer, HUD. ACTION: Notice. SUMMARY: HUD has submitted the proposed information collection requirement described below to the Office of Management and Budget (OMB...

  8. Identification of multi-criteria for supplier selection in IT project outsourcing

    Science.gov (United States)

    Fusiripong, Prashaya; Baharom, Fauziah; Yusof, Yuhanis

    2017-10-01

    In the increasing global business competitiveness, most organizations have attempted to determine the suitable external parties to support their core and non-core competency, particularly, in IT project outsourcing. The IT supplier selection is required to apply multi-criteria which comprised tangible criteria and intangible criteria in consider optimal IT supplier. Most researches attempted to identify optimal criteria for selecting IT supplier, however, the criteria cannot be the considered common criteria support the variety of IT outsourcing. Therefore, the study aimed to identify a common set of criteria being used in the various types of IT outsourcing. The common criteria are constructed by multi-criteria and success criteria, which were collected by literature review with comprehensive and comparative approach. Consequently, the researchers are able to identify a common set of criteria adopted in the variety of selection problem IT outsourcing supplier.

  9. 76 FR 25365 - Notice of Submission of Proposed Information Collection to OMB; County Data Record Project

    Science.gov (United States)

    2011-05-04

    ... the ownership, rights and interests of land parcels and HUD is specifically interested in parcel data related to tax assessment, property sale, easement, lien, land use and condition. DATES: Comments Due Date... the ownership, rights and interests of land parcels and HUD is specifically interested in parcel data...

  10. Novel microscope-integrated stereoscopic heads-up display for intrasurgical optical coherence tomography

    Science.gov (United States)

    Shen, Liangbo; Carrasco-Zevallos, Oscar; Keller, Brenton; Viehland, Christian; Waterman, Gar; Hahn, Paul S.; Kuo, Anthony N.; Toth, Cynthia A.; Izatt, Joseph A.

    2016-01-01

    Intra-operative optical coherence tomography (OCT) requires a display technology which allows surgeons to visualize OCT data without disrupting surgery. Previous research and commercial intrasurgical OCT systems have integrated heads-up display (HUD) systems into surgical microscopes to provide monoscopic viewing of OCT data through one microscope ocular. To take full advantage of our previously reported real-time volumetric microscope-integrated OCT (4D MIOCT) system, we describe a stereoscopic HUD which projects a stereo pair of OCT volume renderings into both oculars simultaneously. The stereoscopic HUD uses a novel optical design employing spatial multiplexing to project dual OCT volume renderings utilizing a single micro-display. The optical performance of the surgical microscope with the HUD was quantitatively characterized and the addition of the HUD was found not to substantially effect the resolution, field of view, or pincushion distortion of the operating microscope. In a pilot depth perception subject study, five ophthalmic surgeons completed a pre-set dexterity task with 50.0% (SD = 37.3%) higher success rate and in 35.0% (SD = 24.8%) less time on average with stereoscopic OCT vision compared to monoscopic OCT vision. Preliminary experience using the HUD in 40 vitreo-retinal human surgeries by five ophthalmic surgeons is reported, in which all surgeons reported that the HUD did not alter their normal view of surgery and that live surgical maneuvers were readily visible in displayed stereoscopic OCT volumes. PMID:27231616

  11. Novel microscope-integrated stereoscopic heads-up display for intrasurgical optical coherence tomography.

    Science.gov (United States)

    Shen, Liangbo; Carrasco-Zevallos, Oscar; Keller, Brenton; Viehland, Christian; Waterman, Gar; Hahn, Paul S; Kuo, Anthony N; Toth, Cynthia A; Izatt, Joseph A

    2016-05-01

    Intra-operative optical coherence tomography (OCT) requires a display technology which allows surgeons to visualize OCT data without disrupting surgery. Previous research and commercial intrasurgical OCT systems have integrated heads-up display (HUD) systems into surgical microscopes to provide monoscopic viewing of OCT data through one microscope ocular. To take full advantage of our previously reported real-time volumetric microscope-integrated OCT (4D MIOCT) system, we describe a stereoscopic HUD which projects a stereo pair of OCT volume renderings into both oculars simultaneously. The stereoscopic HUD uses a novel optical design employing spatial multiplexing to project dual OCT volume renderings utilizing a single micro-display. The optical performance of the surgical microscope with the HUD was quantitatively characterized and the addition of the HUD was found not to substantially effect the resolution, field of view, or pincushion distortion of the operating microscope. In a pilot depth perception subject study, five ophthalmic surgeons completed a pre-set dexterity task with 50.0% (SD = 37.3%) higher success rate and in 35.0% (SD = 24.8%) less time on average with stereoscopic OCT vision compared to monoscopic OCT vision. Preliminary experience using the HUD in 40 vitreo-retinal human surgeries by five ophthalmic surgeons is reported, in which all surgeons reported that the HUD did not alter their normal view of surgery and that live surgical maneuvers were readily visible in displayed stereoscopic OCT volumes.

  12. A New Dynamic Multicriteria Decision-Making Approach for Green Supplier Selection in Construction Projects under Time Sequence

    Directory of Open Access Journals (Sweden)

    Shi Yin

    2017-01-01

    Full Text Available Nowadays, due to the lack of natural resources and environment problems which have been appearing increasingly, green building is more and more involved in the construction industry. The evaluation and selection of green supplier are a significant part of the development of green building. In this paper, we propose a new dynamic multicriteria decision-making approach in construction projects under time sequence to deal with these problems. First, the paper establishes 4 main criteria and 17 subcriteria for green supplier selection in construction projects. Then, a method considering interaction between criteria and the influence of constructors subjective preference and objective criteria information is proposed. It uses the interval-valued intuitionistic fuzzy geometric weighted Heronian means (IVIFGWHM operator and multitarget nonlinear programming model to calculate the comprehensive evaluation results of potential green suppliers. The proposed method is much easier for constructors to select green supplier and make the localization of green supplier more practical and accurate in construction projects. Finally, a case study about a green building project is given to verify practicality and effectiveness of the proposed approach.

  13. Project of neural network for steel grade selection with the assumed CCT diagram

    OpenAIRE

    S. Malara; L.A. Dobrzański; J. Trzaska

    2008-01-01

    Purpose: The aim of this paper was developing a project of neural network for selection of steel grade with the specified CCT diagram – structure and of harness after heat treatment.Design/methodology/approach: The goal has been achieved in the following stages: at the first stage characteristic points of CCT diagram have been determined. At the second stage neural network has been developed and optimized.Findings: The neural network was developed in this paper, that allowed selection of stee...

  14. Cornell University remote sensing program. [selected research projects in land and water resource management

    Science.gov (United States)

    Liang, T.; Belcher, D. J.; Mcnair, A. J.

    1974-01-01

    The major activities of the program staff from December 1, 1973 to May 31, 1974 are reported and include: (1) communication and instruction; (2) data and facilities; (3) research completed; (4) research in progress; (5) selected correspondence; (6) grant sponsored travel; and (7) seminars and newsletters. Detailed information and maps are given for the following selected projects: (1) ERTS mapping of waterways in the Tug Hill region of New York State; (2) photo-archeological investigation of Great Gully, New York; and (3) evaluation of selected highway impacts using aerial photography.

  15. 75 FR 9247 - Multifamily Default Status Report

    Science.gov (United States)

    2010-03-01

    ... Report AGENCY: Office of the Chief Information Officer, HUD. ACTION: Notice. SUMMARY: The proposed... comments on the subject proposal. Mortgagees use this report to notify HUD that a project owner has... INFORMATION CONTACT: Leroy McKinney Jr., Reports Management Officer, QDAM, Department of Housing and Urban...

  16. 75 FR 81292 - Notice of Regulatory Waiver Requests Granted for the Third Quarter of Calendar Year 2010

    Science.gov (United States)

    2010-12-27

    ...)(1) of the HOME regulations to permit limited liability company (LLC) ownership of two HOME projects by the Southwest Minnesota Housing Partnership (SWMHP) in Buff County, MN. Nature of Requirement: HUD... contains requirements applicable to waivers of HUD handbook provisions that are not relevant to the purpose...

  17. PROJECT W-551 DETERMINATION DATA FOR EARLY LAW INTERIM PRETREATMENT SYSTEM SELECTION

    Energy Technology Data Exchange (ETDEWEB)

    TEDESCHI AR

    2008-08-11

    This report provides the detailed assessment forms and data for selection of the solids separation and cesium separation technology for project W-551, Interim Pretreatment System. This project will provide early pretreated low activity waste feed to the Waste Treatment Plant to allow Waste Treatment Plan Low Activity Waste facility operation prior to construction completion of the Pretreatment and High Level Waste facilities. The candidate solids separations technologies are rotary microfiltration and crossflow filtration, and the candidate cesium separation technologies are fractional crystallization, caustic-side solvent extraction, and ion-exchange using spherical resorcinol-formaldehyde resin. This data was used to prepare a cross-cutting technology summary, reported in RPP-RPT-37740.

  18. Selected Examples of LDRD Projects Supporting Test Ban Treaty Verification and Nonproliferation

    Energy Technology Data Exchange (ETDEWEB)

    Jackson, K. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Al-Ayat, R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Walter, W. R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-02-23

    The Laboratory Directed Research and Development (LDRD) Program at the DOE National Laboratories was established to ensure the scientific and technical vitality of these institutions and to enhance the their ability to respond to evolving missions and anticipate national needs. LDRD allows the Laboratory directors to invest a percentage of their total annual budget in cutting-edge research and development projects within their mission areas. We highlight a selected set of LDRD-funded projects, in chronological order, that have helped provide capabilities, people and infrastructure that contributed greatly to our ability to respond to technical challenges in support of test ban treaty verification and nonproliferation.

  19. The role intuitive decision making plays in project selection in the residential property market: a case study of a medium sized

    OpenAIRE

    Ryan, Diarmuid

    2013-01-01

    non-peer-reviewed This thesis addresses the role of intuition in project selection in residential property development. The paper provides a comprehensive review of existing literature in relation to project selection and decision making. In addition, the examination of the project files of M.A. Ryan & Sons Ltd., a medium sized property development company, has enabled a case study to be carried out on three projects carried out by the organisation. Through the case study, t...

  20. 78 FR 14329 - Allocations, Common Application, Waivers, and Alternative Requirements for Grantees Receiving...

    Science.gov (United States)

    2013-03-05

    ... sites regarding all disaster recovery activities assisted with these funds, and detect and prevent waste... projections is available on HUD's Web site under the Office of Community Planning and Development, Disaster Recovery Assistance (herein also referred to as the CPD Disaster Recovery Web site). This will enable HUD...

  1. A MCDM approach for project finance selection: An application in the renewable energy sector

    Directory of Open Access Journals (Sweden)

    García-Bernabeu, Ana

    2015-05-01

    Full Text Available Renewable energy (RE is emerging as a solution in order to replace fossil fuels and become the primary source of energy consumption. Investments in the RE sector involve huge amounts of capital but also many risks. Public sector plays an important role in promoting RE projects but due to the need for reducing public expenditure the private sector becomes essential in financing this type of projects. Project Finance is widely used in RE projects and is especially attractive to the private sector because it can fund major projects off balance sheet. The objective of this paper is to present a decision making tool for helping the private sector on the selection process of RE projects to be funded. The problem could be considered as a multiple criteria decision-making problem where both, financial and non-financial criteria have to be taken into account. Objective aggregation weights for those criteria are obtained using the Moderate Pessimism Decision Making approach and a final ranking of the projects is obtained.

  2. APPLICATION OF AHP METHOD IN THE IDENTIFICATION AND CLASSIFICATION OF PROJECT SELECTION CRITERIA: AN ENERGY SECTOR CASE STUDY

    Directory of Open Access Journals (Sweden)

    Silvério, Adriano Augusto

    2015-07-01

    Full Text Available Choosing from several alternative investment projects in hydropower to build a portfolio of projects is a complex matter. The most commonly used selection model for building the portfolio is the financial method, however it constraints options investments to the economic and financial parameters, which are limiting in nature. Alternatively, this paper proposes the use of multicriterial method Analytic Hierarchy Process – AHP, which incorporates measures to evaluate both quantitative and qualitative data. This method is based on criteria or parameters of operational processes that hinder or facilitate the execution of projects. In order to get the definition of the set of criteria, the Delphi technique was applied to a group of seven experts in managing hydropower projects. Main results show that essential criteria for selection of project investment portfolio, are not limited to financial aspects, but it involves criteria of bureaucratic, organizational, and political environment and technological characters. The conclusion is that the financial potential of hydropower projects are not the only determinants for investments on hydropower projects and, at large, these project are conditioned to other criteria such as, those of bureaucratic and technological nature.

  3. A Consistent Fuzzy Preference Relations Based ANP Model for R&D Project Selection

    Directory of Open Access Journals (Sweden)

    Chia-Hua Cheng

    2017-08-01

    Full Text Available In today’s rapidly changing economy, technology companies have to make decisions on research and development (R&D projects investment on a routine bases with such decisions having a direct impact on that company’s profitability, sustainability and future growth. Companies seeking profitable opportunities for investment and project selection must consider many factors such as resource limitations and differences in assessment, with consideration of both qualitative and quantitative criteria. Often, differences in perception by the various stakeholders hinder the attainment of a consensus of opinion and coordination efforts. Thus, in this study, a hybrid model is developed for the consideration of the complex criteria taking into account the different opinions of the various stakeholders who often come from different departments within the company and have different opinions about which direction to take. The decision-making trial and evaluation laboratory (DEMATEL approach is used to convert the cause and effect relations representing the criteria into a visual network structure. A consistent fuzzy preference relations based analytic network process (CFPR-ANP method is developed to calculate the preference-weights of the criteria based on the derived network structure. The CFPR-ANP is an improvement over the original analytic network process (ANP method in that it reduces the problem of inconsistency as well as the number of pairwise comparisons. The combined complex proportional assessment (COPRAS-G method is applied with fuzzy grey relations to resolve conflicts arising from differences in information and opinions provided by the different stakeholders about the selection of the most suitable R&D projects. This novel combination approach is then used to assist an international brand-name company to prioritize projects and make project decisions that will maximize returns and ensure sustainability for the company.

  4. SalHUD--A Graphical Interface to Public Health Data in Puerto Rico.

    Science.gov (United States)

    Ortiz-Zuazaga, Humberto G; Arce-Corretjer, Roberto; Solá-Sloan, Juan M; Conde, José G

    2015-12-22

    This paper describes SalHUD, a prototype web-based application for visualizing health data from Puerto Rico. Our initial focus was to provide interactive maps displaying years of potential life lost (YPLL). The public-use mortality file for year 2008 was downloaded from the Puerto Rico Institute of Statistics website. Data was processed with R, Python and EpiInfo to calculate years of potential life lost for the leading causes of death on each of the 78 municipalities in the island. Death records were classified according to ICD-10 codes. YPLL for each municipality was integrated into AtlasPR, a D3 Javascript map library. Additional Javascript, HTML and CSS programing was required to display maps as a web-based interface. YPLL for all municipalities are displayed on a map of Puerto Rico for each of the ten leading causes of death and for all causes combined, so users may dynamically explore the impact of premature mortality. This work is the first step in providing the general public in Puerto Rico with user-friendly, interactive, visual access to public health data that is usually published in numerical, text-based media.

  5. 78 FR 40158 - Supportive Housing for the Elderly Senior Preservation Rental Assistance Contracts: 60-Day Notice...

    Science.gov (United States)

    2013-07-03

    ... project that have been audited by an Independent Public Accountant in the form required by HUD. All four...: Notice of request for public comment. SUMMARY: In accordance with the Paperwork Reduction Act of 1995, HUD is issuing for public comment four documents for use in the Senior Preservation Rental Assistance...

  6. Methodical bases of selection and evaluation of the effectiveness of the projects of the urban territory renovation

    Science.gov (United States)

    Sizova, Evgeniya; Zhutaeva, Evgeniya; Chugunov, Andrei

    2018-03-01

    The article highlights features of processes of urban territory renovation from the perspective of a commercial entity participating in the implementation of a project. The requirements of high-rise construction projects to the entities, that carry out them, are considered. The advantages of large enterprises as participants in renovation projects are systematized, contributing to their most efficient implementation. The factors, which influence the success of the renovation projects, are presented. A method for selecting projects for implementation based on criteria grouped by qualitative characteristics and contributing to the most complete and comprehensive evaluation of the project is suggested. Patterns to prioritize and harmonize renovation projects in terms of multi-project activity of the enterprise are considered.

  7. Selecting the Most Economic Project under Uncertainty Using Bootstrap Technique and Fuzzy Simulation

    Directory of Open Access Journals (Sweden)

    Kamran Shahanaghi

    2012-01-01

    Full Text Available This article, by leaving pre-determined membership function of a fuzzy set which is a basic assumption for such subject, will try to propose a hybrid technique to select the most economic project among alternative projects in fuzziness interest rates condition. In this way, net present worth (NPW would be the economic indicator. This article tries to challenge the assumption of large sample sizes availability for membership function determination and shows that some other techniques may have less accuracy. To give a robust solution, bootstrapping and fuzzy simulation is suggested and a numerical example is given and analyzed.

  8. 75 FR 16821 - Housing Finance Agency Risk-Sharing Program

    Science.gov (United States)

    2010-04-02

    ...The proposed information collection requirement described below has been submitted to the Office of Management and Budget (OMB) for review, as required by the Paperwork Reduction Act. The Department is soliciting public comments on the subject proposal. Section 542(c) of the Risk Sharing Program authorizes qualified Housing Finance Agencies (HFAs) to underwrite and process loans. HUD provides full mortgage insurance on affordable multifamily housing project processed by HFAs under this program. Qualified HFAs are vested with the maximum amount of processing responsibilities. By entering into Risk-Sharing Agreement with HUD, HFAs contract to reimburse HUD for a portion of the loss from any defaults that occur while HUD insurance is in force.

  9. Management Model for Evaluation and Selection of Engineering Equipment Suppliers for Construction Projects in Iraq

    Directory of Open Access Journals (Sweden)

    Kadhim Raheem Erzaij

    2016-06-01

    Full Text Available Engineering equipment is essential part in the construction project and usually manufactured with long lead times, large costs and special engineering requirements. Construction manager targets that equipment to be delivered in the site need date with the right quantity, appropriate cost and required quality, and this entails an efficient supplier can satisfy these targets. Selection of engineering equipment supplier is a crucial managerial process .it requires evaluation of multiple suppliers according to multiple criteria. This process is usually performed manually and based on just limited evaluation criteria, so better alternatives may be neglected. Three stages of survey comprised number of public and private companies in Iraqi construction sector were employed to identify main criteria and sub criteria for supplier selection and their priorities.The main criteria identified were quality of product, commercial aspect, delivery, reputation and position, and system quality . An effective technique in multiple criteria decision making (MCDM as analytical hierarchy process (AHP have been used to get importance weights of criteria based on experts judgment. Thereafter, a management software system for Evaluation and Selection of Engineering Equipment Suppliers (ESEES has been developed based on the results obtained from AHP. This model was validated in a case study at municipality of Baghdad involved actual cases of selection pumps suppliers for infrastructure projects .According to experts, this model can improve the current process followed in the supplier selection and aid decision makers to adopt better choices in the domain of selection engineering equipment suppliers.

  10. Multi-period project portfolio selection under risk considerations and stochastic income

    Science.gov (United States)

    Tofighian, Ali Asghar; Moezzi, Hamid; Khakzar Barfuei, Morteza; Shafiee, Mahmood

    2018-02-01

    This paper deals with multi-period project portfolio selection problem. In this problem, the available budget is invested on the best portfolio of projects in each period such that the net profit is maximized. We also consider more realistic assumptions to cover wider range of applications than those reported in previous studies. A novel mathematical model is presented to solve the problem, considering risks, stochastic incomes, and possibility of investing extra budget in each time period. Due to the complexity of the problem, an effective meta-heuristic method hybridized with a local search procedure is presented to solve the problem. The algorithm is based on genetic algorithm (GA), which is a prominent method to solve this type of problems. The GA is enhanced by a new solution representation and well selected operators. It also is hybridized with a local search mechanism to gain better solution in shorter time. The performance of the proposed algorithm is then compared with well-known algorithms, like basic genetic algorithm (GA), particle swarm optimization (PSO), and electromagnetism-like algorithm (EM-like) by means of some prominent indicators. The computation results show the superiority of the proposed algorithm in terms of accuracy, robustness and computation time. At last, the proposed algorithm is wisely combined with PSO to improve the computing time considerably.

  11. A contrast between DEMATEL-ANP and ANP methods for six sigma project selection: a case study in healthcare industry.

    Science.gov (United States)

    Ortíz, Miguel A; Felizzola, Heriberto A; Nieto Isaza, Santiago

    2015-01-01

    The project selection process is a crucial step for healthcare organizations at the moment of implementing six sigma programs in both administrative and caring processes. However, six-sigma project selection is often defined as a decision making process with interaction and feedback between criteria; so that it is necessary to explore different methods to help healthcare companies to determine the Six-sigma projects that provide the maximum benefits. This paper describes the application of both ANP (Analytic Network process) and DEMATEL (Decision Making trial and evaluation laboratory)-ANP in a public medical centre to establish the most suitable six sigma project and finally, these methods were compared to evaluate their performance in the decision making process. ANP and DEMATEL-ANP were used to evaluate 6 six sigma project alternatives under an evaluation model composed by 3 strategies, 4 criteria and 15 sub-criteria. Judgement matrixes were completed by the six sigma team whose participants worked in different departments of the medical centre. The improving of care opportunity in obstetric outpatients was elected as the most suitable six sigma project with a score of 0,117 as contribution to the organization goals. DEMATEL-ANP performed better at decision making process since it reduced the error probability due to interactions and feedback. ANP and DEMATEL-ANP effectively supported six sigma project selection processes, helping to create a complete framework that guarantees the prioritization of projects that provide maximum benefits to healthcare organizations. As DEMATEL- ANP performed better, it should be used by practitioners involved in decisions related to the implementation of six sigma programs in healthcare sector accompanied by the adequate identification of the evaluation criteria that support the decision making model. Thus, this comparative study contributes to choosing more effective approaches in this field. Suggestions of further work are also

  12. 75 FR 27572 - Monthly Report of Excess Income and Annual Report of Uses of Excess Income

    Science.gov (United States)

    2010-05-17

    ... Income and Annual Report of Uses of Excess Income AGENCY: Office of the Chief Information Officer, HUD... permitted to retain Excess Income for projects under terms and conditions established by HUD. Owners must request to retain some or all of their Excess Income. The request must be submitted through http://www.pay...

  13. 24 CFR 241.825 - Pro rata refund of insurance premium.

    Science.gov (United States)

    2010-04-01

    ... Projects Without a HUD-Insured or HUD-Held Mortgage Premiums § 241.825 Pro rata refund of insurance premium... of the current annual loan insurance premium theretofore paid which is applicable to the portion of... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Pro rata refund of insurance...

  14. Project Management Consultancy (PMC) procurement approach: Supplier's evaluation and selection dilemma

    Science.gov (United States)

    Nawi, Mohd Nasrun Mohd; Azimi, Mohd Azrulfitri; Pozin, Mohd Affendi Ahmad; Osman, Wan Nadri; Anuar, Herman Shah

    2016-08-01

    Project Management Consultancy (PMC) is part of the management oriented procurement method in which a sole consultant is hired by the client to deal with the contactors in place of the client. Appointing contractors in this method or approach looks to be interesting as client could play a pivotal role in evaluating and selecting the supplier/contractor for the work package. In some cases, client gives the authority for the PMC to hire the supplier/contractor of their choice while in some cases the client is the one who made the decision. This research paper seeks to investigate the dilemma arises from this situation and for the purpose of this research, a real case study was studied to assess the impacts of such dilemma to the performance of the project. Recommendations on how to tackle the dilemma will also be addressed in the later part of this research paper.

  15. Women, Islam, and Pakistan: A Selected Annotated Bibliography. Fulbright-Hays Summer Seminar Abroad Project.

    Science.gov (United States)

    Phillips, Brenda

    This bibliography features selected books, book chapters, research projects, and journal articles, published between 1953 and 1994, about the social, legal, economic, educational political, and professional position of Muslim Pakistani women. Sixteen of the references are annotated. An additional 41 bibliographic references to other materials, not…

  16. Selection of the best consultant for SAP ERP project using combined AHP-IBA approach

    Directory of Open Access Journals (Sweden)

    Martinović Nataša

    2014-01-01

    Full Text Available In this paper we propose a combined AHP-IBA model for selecting the best SAP consultant for an SAP ERP project. The goal of the SAP Project Manager is to choose the best consultant, the one who is able to implement standard SAP functionalities with quality and on time. When making a decision on the basis of multiple criteria, the traditional Analytic Hierarchy Process (AHP method does not take into account the fact that attributes may correlate, assuming that there are no dependencies between them. However, the dependencies of the attributes can often be used to model important knowledge for multiple criteria decision analysis. We propose an extension to the traditional AHP method by applying Interpolative realization of Boolean algebra (IBA, using AHP to determine the criteria weights, and IBA to model the logical interactions among criteria. The research conducted on ERP consultant selection suggests that the decision making process is modelled more accurately if logical interactions between attributes are modelled before applying AHP.

  17. 24 CFR 886.131 - Audit.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Audit. 886.131 Section 886.131... Projects With HUD-Insured and HUD-Held Mortgages § 886.131 Audit. (a) Where a State or local government is... assistance under this part, the audit requirements in 24 CFR part 44 shall apply. (b) Where a nonprofit...

  18. Phase selection in the mushy-zone: LODESTARS and ELFSTONE projects

    International Nuclear Information System (INIS)

    Matson, D M; Hyers, R W; Volkmann, T; Fecht, H-J

    2011-01-01

    In a collaboration sponsored by ESA and NASA, international partners have developed a work plan to successfully address key issues relating to understanding the role of convection on alloy phase selection for commercially important structural alloys using the MSL-EML facility aboard the International Space Station. The approach is two-pronged. First, ground and space-based experiments will develop a baseline database to anchor subsequent modelling predictions. Tasks include sample preparation and verification, ground-based transformation evaluation, space-based experiments, and thermophysical property evaluation to support modelling activities. Second, modelling and theoretical analysis tasks will lead to a new understanding of the role of convection in phase selection for this class of materials. These models will allow prediction and control of microstructural evolution during solidification processing. Tasks include modelling of macroconvection induced by the EM levitation field, modelling of microconvection within the dendrite array, nucleation modelling, and modelling of the transformation kinetics specific to each alloy system. This paper outlines how two NASA-sponsored projects relate to the goals of the international collaboration.

  19. Phase selection in the mushy-zone: LODESTARS and ELFSTONE projects

    Science.gov (United States)

    Matson, D. M.; Hyers, R. W.; Volkmann, T.; Fecht, H.-J.

    2011-12-01

    In a collaboration sponsored by ESA and NASA, international partners have developed a work plan to successfully address key issues relating to understanding the role of convection on alloy phase selection for commercially important structural alloys using the MSL-EML facility aboard the International Space Station. The approach is two-pronged. First, ground and space-based experiments will develop a baseline database to anchor subsequent modelling predictions. Tasks include sample preparation and verification, ground-based transformation evaluation, space-based experiments, and thermophysical property evaluation to support modelling activities. Second, modelling and theoretical analysis tasks will lead to a new understanding of the role of convection in phase selection for this class of materials. These models will allow prediction and control of microstructural evolution during solidification processing. Tasks include modelling of macroconvection induced by the EM levitation field, modelling of microconvection within the dendrite array, nucleation modelling, and modelling of the transformation kinetics specific to each alloy system. This paper outlines how two NASA-sponsored projects relate to the goals of the international collaboration.

  20. Methods Dealing with Complexity in Selecting Joint Venture Contractors for Large-Scale Infrastructure Projects

    Directory of Open Access Journals (Sweden)

    Ru Liang

    2018-01-01

    Full Text Available The magnitude of business dynamics has increased rapidly due to increased complexity, uncertainty, and risk of large-scale infrastructure projects. This fact made it increasingly tough to “go alone” into a contractor. As a consequence, joint venture contractors with diverse strengths and weaknesses cooperatively bid for bidding. Understanding project complexity and making decision on the optimal joint venture contractor is challenging. This paper is to study how to select joint venture contractors for undertaking large-scale infrastructure projects based on a multiattribute mathematical model. Two different methods are developed to solve the problem. One is based on ideal points and the other one is based on balanced ideal advantages. Both of the two methods consider individual difference in expert judgment and contractor attributes. A case study of Hong Kong-Zhuhai-Macao-Bridge (HZMB project in China is used to demonstrate how to apply these two methods and their advantages.

  1. Survey of siting practices for selected management projects in seven countries

    International Nuclear Information System (INIS)

    Hardin, E.; Aahagen, H.

    1992-06-01

    This paper surveys siting practices for deep geologic disposal in seven countries, and attempts to formulate generalizations which could be useful for the upcoming review of the Swedish plan for siting the SFL repository (R and D 92). Comparison of projects in different countries is done with full appreciation of the technical, legal, and cultural differences. The seven countries were selected for experience with siting in crystalline rock, similarity of siting practices to Sweden, and the availability of published information. Local governments have demonstrated effective veto power in each of the seven countries surveyed, although this power is exercised in different ways. This paper shows how the siting strategy itself affects the ability and the inclination of localities to block the project. It shows by example that public involvement, parallel vs. sequential characterization, schedule for siting activities, and the existence of interim waste storage capability have an impact on the success of siting. The focus of this paper is deep geologic disposal. Shallow land disposal and non-radioactive wastes are not discussed in detail, with three exceptions: LLW disposal siting in the U.S. and Canada, and the SAKAB incinerator projects in Sweden. These provide insight into siting approaches and demonstrate that conclusions regarding deep geologic disposal are supported by other experience. (114 refs.) (au)

  2. 78 FR 21395 - Announcement of Funding Awards, Choice Neighborhoods Grant Program, Fiscal Year 2012

    Science.gov (United States)

    2013-04-10

    ..., telephone (202) 401-8812. Hearing or speech-impaired individuals may access this number via TTY by calling..._indian_housing/programs/ph/cn/planninggrants . Applications were scored and selected for funding based on...-193 and http://portal.hud.gov/hudportal/HUD?src=/program_offices/public_indian_housing/programs/ph/cn...

  3. Project selection problem under uncertainty: An application of utility theory and chance constrained programming to a real case

    Directory of Open Access Journals (Sweden)

    Reza Hosnavi Atashgah

    2013-06-01

    Full Text Available Selecting from a pool of interdependent projects under certainty, when faced with resource constraints, has been studied well in the literature of project selection problem. After briefly reviewing and discussing popular modeling approaches for dealing with uncertainty, this paper proposes an approach based on chance constrained programming and utility theory for a certain range of problems and under some practical assumptions. Expected Utility Programming, as the proposed modeling approach, will be compared with other well-known methods and its meaningfulness and usefulness will be illustrated via two numerical examples and one real case.

  4. Proposal for Land Consolidation Project Solutions for Selected Problem Areas

    Science.gov (United States)

    Wojcik-Len, Justyna; Strek, Zanna

    2017-12-01

    One of the economic tools for supporting agricultural policy are the activities implemented under the Rural Development Program (RDP). By encouraging agricultural activities and creating equal opportunities for development of farms, among others in areas with unfavourable environmental conditions characterized by low productivity of soils exposed to degradation, decision makers can contribute to improving the spatial structure of rural areas. In Poland, one of the major concerns are agricultural problem areas (regions). In view of this situation, the aim of this article was to characterize the problem areas in question and propose land consolidation project solutions for selected fragments of those areas. This paper presents the results of a review of literature and an analysis of geodetic and cartographic data regarding the problem areas. The process of land consolidation, which is one of the technical and legal instruments supporting the development of rural areas, was characterized. The study allowed the present authors to establish criteria for selecting agricultural problem areas for land consolidation. To develop a proposal for rational management of the problem areas, key general criteria (location, topography, soil quality and usefulness) and specific criteria were defined and assigned weights. A conception of alternative development of the agricultural problem areas was created as part of a land consolidation project. The results were used to create a methodology for the development of agricultural problem areas to be employed during land consolidation in rural areas. Every agricultural space includes areas with unfavourable environmental and soil conditions determined by natural or anthropogenic factors. Development of agricultural problem areas through land consolidation should take into account the specific functions assigned to these areas in land use plans, as well as to comply with legal regulations.

  5. An Objective Approach to Select Climate Scenarios when Projecting Species Distribution under Climate Change.

    Directory of Open Access Journals (Sweden)

    Nicolas Casajus

    Full Text Available An impressive number of new climate change scenarios have recently become available to assess the ecological impacts of climate change. Among these impacts, shifts in species range analyzed with species distribution models are the most widely studied. Whereas it is widely recognized that the uncertainty in future climatic conditions must be taken into account in impact studies, many assessments of species range shifts still rely on just a few climate change scenarios, often selected arbitrarily. We describe a method to select objectively a subset of climate change scenarios among a large ensemble of available ones. Our k-means clustering approach reduces the number of climate change scenarios needed to project species distributions, while retaining the coverage of uncertainty in future climate conditions. We first show, for three biologically-relevant climatic variables, that a reduced number of six climate change scenarios generates average climatic conditions very close to those obtained from a set of 27 scenarios available before reduction. A case study on potential gains and losses of habitat by three northeastern American tree species shows that potential future species distributions projected from the selected six climate change scenarios are very similar to those obtained from the full set of 27, although with some spatial discrepancies at the edges of species distributions. In contrast, projections based on just a few climate models vary strongly according to the initial choice of climate models. We give clear guidance on how to reduce the number of climate change scenarios while retaining the central tendencies and coverage of uncertainty in future climatic conditions. This should be particularly useful during future climate change impact studies as more than twice as many climate models were reported in the fifth assessment report of IPCC compared to the previous one.

  6. An Objective Approach to Select Climate Scenarios when Projecting Species Distribution under Climate Change.

    Science.gov (United States)

    Casajus, Nicolas; Périé, Catherine; Logan, Travis; Lambert, Marie-Claude; de Blois, Sylvie; Berteaux, Dominique

    2016-01-01

    An impressive number of new climate change scenarios have recently become available to assess the ecological impacts of climate change. Among these impacts, shifts in species range analyzed with species distribution models are the most widely studied. Whereas it is widely recognized that the uncertainty in future climatic conditions must be taken into account in impact studies, many assessments of species range shifts still rely on just a few climate change scenarios, often selected arbitrarily. We describe a method to select objectively a subset of climate change scenarios among a large ensemble of available ones. Our k-means clustering approach reduces the number of climate change scenarios needed to project species distributions, while retaining the coverage of uncertainty in future climate conditions. We first show, for three biologically-relevant climatic variables, that a reduced number of six climate change scenarios generates average climatic conditions very close to those obtained from a set of 27 scenarios available before reduction. A case study on potential gains and losses of habitat by three northeastern American tree species shows that potential future species distributions projected from the selected six climate change scenarios are very similar to those obtained from the full set of 27, although with some spatial discrepancies at the edges of species distributions. In contrast, projections based on just a few climate models vary strongly according to the initial choice of climate models. We give clear guidance on how to reduce the number of climate change scenarios while retaining the central tendencies and coverage of uncertainty in future climatic conditions. This should be particularly useful during future climate change impact studies as more than twice as many climate models were reported in the fifth assessment report of IPCC compared to the previous one.

  7. 24 CFR 266.520 - Program monitoring and compliance.

    Science.gov (United States)

    2010-04-01

    ... AUTHORITIES HOUSING FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Project Management and Servicing § 266.520 Program monitoring and compliance. HUD will monitor the...

  8. PORTFOLIO SELECTION OF INFORMATION SYSTEMS PROJECTS USING PROMETHEE V WITH C-OPTIMAL CONCEPT

    Directory of Open Access Journals (Sweden)

    Jonatas A. de Almeida

    2014-05-01

    Full Text Available This paper presents a multicriteria decision model for selecting a portfolio of information system (IS projects, which integrates strategic and organizational view within a multicriteria decision structure. The PROMETHEE V method, based on outranking relations is applied, considering the c-optimal concept in order to overcome some scaling problems found in the classical PROMETHEE V approach. Then, a procedure is proposed in order to make a final analysis of the c-optimal portfolios found as a result of using PROMETHEE V. Also, the organizational view is discussed, including some factors that may influence decision making on IS projects to be included in the portfolio, such as adding the company's strategic vision and technical aspects that demonstrate how IS contributes value to a company's business.

  9. Projects management in organization on the selected example

    OpenAIRE

    A. Kania; M. Spilka; S. Griner

    2013-01-01

    Purpose: In this paper stages of project management taking into consideration many useful tools and methods were presented. The quality management in the project, the risk estimation, costs of the project realization and many others were discussed. The analysis of project management of an element using in an automotive industry was carried out.Design/methodology/approach: In this article classification of the projects was presented. The stages of project management and relations among them we...

  10. Selection of priority investment projects for the development of the Russian Arctic

    Science.gov (United States)

    Novoselov, A.; Potravny, I.; Novoselova, I.; Gassiy, V.

    2017-12-01

    In the Russian Arctic, there is currently an active process of preparation and implementation of investment projects aiming to extract natural resources, with the aim of sustainable socioeconomic development of the region. These projects are associated with the development of key zones in the Arctic and involve the exploration for and production of minerals (diamonds, gold, rare-earth metals, oil, and gas) and the development of energy and infrastructure (e.g., the Northern Sea Route). Such projects, which are often carried out in territories of traditional nature management belonging to the indigenous peoples of the North, must consider their environmental and social responsibility and the preservation of the ethnic identity and culture of indigenous peoples. The extraction of mineral deposits in the Arctic and the Far North places new demands on subsoil users, related to the preservation and development of the socio-cultural environment of the indigenous peoples of the North and to the ecological rehabilitation of the area. This article presents economic and mathematical models for selecting the optimal development project options based on the pairwise comparison of investment projects and the evaluation of indigenous peoples' preferences. We investigated the investment projects' impact on traditional territories in the Arctic, including the Republic of Sakha (Yakutia), in terms of socioeconomic and ethnological development, and environmental change. The suggested system of models can be used to assess the priority of projects supporting and developing the region in the mining corporation's area of responsibility. The proposed models are based on fuzzy set theory, which provides an effective assessment of the population's preferences for projects. Data are processed using the hierarchy analysis method and multivariate optimization calculations to determine the project sets at different funding levels. The creation of information-linked processing models is

  11. Research and Development Project Selection Methods at the Air Force Wright Aeronautical Laboratories.

    Science.gov (United States)

    1985-09-01

    personal and telephone interviews. Ten individuals from each of the four AFWAL Laboratories were interrviewed. The results illustrated that few of the...680). Aaker and Tyebee. 1978. The authors constructed a model that dealt with the selection of interdependent R&D projects. The model covers three...of this research effort. Scope * The data collection method used in this study consisted of a combination of personal and telephone interviews. The

  12. Seismic safety margins research program. Phase I final report - Plant/site selection and data collection (Project I)

    International Nuclear Information System (INIS)

    Chuang, T.Y.

    1981-07-01

    Project I of Phase I of the Seismic Safety Margins Research Program (SSMRP) comprised two parts: the selection of a representative nuclear power plant/site for study in Phase I and the collection of data needed by the other SSMRP projects. Unit 1 of the Zion Nuclear Power Plant in Zion, Illinois, was selected for the SSMRP Phase I studies. Unit 1 of the Zion plant has been validated as a good choice for the Phase I study plant. Although no single nuclear power plant can represent all such plants equally well, selection criteria were developed to maximize the generic implications of Phase I of the SSMRP. On the basis of the selection criteria, the Zion plant and its site were found to be reasonably representative of operating and future plants with regard to its nuclear steam supply system; the type of containment structure (prestressed concrete); its electrical capacity (1100 MWe); its location (the Midwest); the peak seismic acceleration used for design (0.17g); and the properties of the underlying soil (the low-strain shear-wave velocity is 1650 ft/s in a 50- to 100-ft-thick layer of soil overlying sedimentary bedrock). (author)

  13. Adaptive Equalizer Using Selective Partial Update Algorithm and Selective Regressor Affine Projection Algorithm over Shallow Water Acoustic Channels

    Directory of Open Access Journals (Sweden)

    Masoumeh Soflaei

    2014-01-01

    Full Text Available One of the most important problems of reliable communications in shallow water channels is intersymbol interference (ISI which is due to scattering from surface and reflecting from bottom. Using adaptive equalizers in receiver is one of the best suggested ways for overcoming this problem. In this paper, we apply the family of selective regressor affine projection algorithms (SR-APA and the family of selective partial update APA (SPU-APA which have low computational complexity that is one of the important factors that influences adaptive equalizer performance. We apply experimental data from Strait of Hormuz for examining the efficiency of the proposed methods over shallow water channel. We observe that the values of the steady-state mean square error (MSE of SR-APA and SPU-APA decrease by 5.8 (dB and 5.5 (dB, respectively, in comparison with least mean square (LMS algorithm. Also the families of SPU-APA and SR-APA have better convergence speed than LMS type algorithm.

  14. 50 CFR 86.61 - What process does the Service use to select projects for grants?

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false What process does the Service use to....61 What process does the Service use to select projects for grants? The Service's Division of Federal... SERVICE, DEPARTMENT OF THE INTERIOR (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE SPORT FISH RESTORATION...

  15. Estimation of volatility of selected oil production projects

    International Nuclear Information System (INIS)

    Costa Lima, Gabriel A.; Suslick, Saul B.

    2006-01-01

    In oil project valuation and investment decision-making, volatility is a key parameter, but it is difficult to estimate. From a traditional investment viewpoint, volatility reduces project value because it increases its discount rate via a higher risk premium. Contrarily, according to the real-option pricing theory, volatility may aggregate value to the project, since the downside potential is limited whereas the upside is theoretically unbounded. However, the estimation of project volatility is very complicated since there is not a historical series of project values. In such cases, many analysts assume that oil price volatility is equal to that of project. In order to overcome such problems, in this paper an alternative numerical method based on present value of future cash flows and Monte Carlo simulation is proposed to estimate the volatility of projects. This method is applied to estimate the volatility of 12 deep-water offshore oil projects considering that oil price will evolve according to one of two stochastic processes: Geometric Brownian Motion and Mean-Reverting Motion. Results indicate that the volatility of commodity usually undervalue that of project. For the set of offshore projects analyzed in this paper, project volatility is at least 79% higher than that of oil prices and increases dramatically in those cases of high capital expenditures and low price. (author)

  16. Lab-Scale CO2 Capture Studies and Selection of most Promising Sorbent. CAPHIGAS Project Tasks Report. Years 2010-2011

    International Nuclear Information System (INIS)

    Marano, M.; Torreiro, Y.

    2012-01-01

    In this report the main activities carried out within the CAPHIGAS Project, ref. ENE2009-08002 financed by the Spanish Ministry of Science and Innovation for the first two years are reported. The aim of the project is the development of a hybrid system WGS-adsorbent-membrane for the separation of CO 2 with H 2 production and this report summarises the most relevant results obtained on tasks L-1 and L-2 which refer to the selection, characterisation and study at laboratory scale of different sorbent materials to select those more promising for the hybrid system proposed. (Author) 55 refs.

  17. Selective elimination of intracortically projecting neurons of the rat neocortex by prenatal x-irradiation

    International Nuclear Information System (INIS)

    Jensen, K.F.

    1981-01-01

    The development of new racing methods has suggested that there are species differences in the extent of the contribution of the different layers of the neocortex to the callosal projection. The present investigation has utilized prenatal x-irradiation to selectively eliminate the late forming neurons of the supragranular layers of the rat neocortex. The reduction in the neuronal population of the supragranular layers closely parallels the reduction in the corpus callosum. These results indicate that the primary source of neurons of the callosal projection, are the late forming neurons of the supragranular layers. Thus, the current results suggest that low dose prenatal x-irradiation may be used to evaluate important developmental events in the formation of neocortical circuitry

  18. Identification and selection of cases and controls in the Pneumonia Etiology Research for Child Health project

    NARCIS (Netherlands)

    Deloria-Knoll, Maria; Feikin, Daniel R.; Scott, J. Anthony G.; O'Brien, Katherine L.; DeLuca, Andrea N.; Driscoll, Amanda J.; Levine, Orin S.; Black, Robert E.; Bhutta, Zulfiqar A.; Campbell, Harry; Cherian, Thomas; Crook, Derrick W.; de Jong, Menno D.; Dowell, Scott F.; Graham, Stephen M.; Klugman, Keith P.; Lanata, Claudio F.; Madhi, Shabir A.; Martin, Paul; Nataro, James P.; Piazza, Franco M.; Qazi, Shamim A.; Zar, Heather J.; Baggett, Henry C.; Brooks, W. Abdullah; Chipeta, James; Ebruke, Bernard; Endtz, Hubert P.; Groome, Michelle; Hammitt, Laura L.; Howie, Stephen R. C.; Kotloff, Karen; Maloney, Susan A.; Moore, David; Otieno, Juliet; Seidenberg, Phil; Tapia, Milagritos; Thamthitiwat, Somsak; Thea, Donald M.; Zaman, Khaleque

    2012-01-01

    Methods for the identification and selection of patients (cases) with severe or very severe pneumonia and controls for the Pneumonia Etiology Research for Child Health (PERCH) project were needed. Issues considered include eligibility criteria and sampling strategies, whether to enroll hospital or

  19. Study of decision framework of wind farm project plan selection under intuitionistic fuzzy set and fuzzy measure environment

    International Nuclear Information System (INIS)

    Wu, Yunna; Geng, Shuai; Xu, Hu; Zhang, Haobo

    2014-01-01

    Highlights: • Experts’ opinions are expressed by using the intuitionistic fuzzy values. • Fuzzy measure is used to solve the dependence problem of criteria. • The compensatory problem of performance scores is reasonably processed. - Abstract: Project selection plays an important role in the entire life cycle of wind farm project and the multi-criteria decision making (MCDM) methods are very important in the whole wind farm project plan selection process. There are problems in the present MCDM methods decrease evaluation quality of the wind farm project plans: first, the information loss exists in the wind farm project plan evaluation process. Second, it is difficult to satisfy the independent assumption of the multi-criteria decision making methods used in the wind farm project plan evaluation in fact. Third, the compensatory problem of performance scores of the wind farm project plans is processed unreasonably. Hence the innovation points of this paper are as follows: first, the intuitionistic fuzzy numbers are used instead of fuzzy numbers or numerical values to reflect the experts’ intuitive preferences to decrease the probability of information loss; second, the fuzzy measure is used to rate the important degrees of criteria in order to avoid the independent assumption and to increase the reasonability; third, the partial compensatory problem of performance scores is well processed by using intuitionistic fuzzy Choquet (IFC) operator and generalized intuitionistic fuzzy ordered geometric averaging (GIFOGA) operator. These operators can deal with the compensatory performance scores and non-compensatory performance scores respectively. Finally, a case study demonstrates the effectiveness of decision framework

  20. 24 CFR 266.656 - Recovery of costs after final claim settlement.

    Science.gov (United States)

    2010-04-01

    ... AUTHORITIES HOUSING FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS... project or otherwise, the total amount of such recovery shall be shared by HUD and the HFA in accordance...

  1. 78 FR 29770 - Notice of Fund Availability (NOFA) for the Neighborhood Stabilization Program 2 (NSP2) Under the...

    Science.gov (United States)

    2013-05-21

    .... This data is now dated and in many cases it no longer reflects the foreclosure market in NSP2 target... needs index score in selecting geographic target areas. DATES: Effective Date: May 21, 2013. FOR FURTHER... NSP2 NOFA requires grantees to carry out NSP2 activities in a HUD-approved target area. HUD developed a...

  2. A project-based geoscience curriculum: select examples

    Science.gov (United States)

    Brown, L. M.; Kelso, P. R.; White, R. J.; Rexroad, C. B.

    2007-12-01

    Principles of constructivist educational philosophy serve as a foundation for the recently completed National Science Foundation sponsored undergraduate curricular revision undertaken by the Geology Department of Lake Superior State University. We integrate lecture and laboratory sessions utilizing active learning strategies that focus on real-world geoscience experiences and problems. In this presentation, we discuss details of three research-like projects that require students to access original data, process and model the data using appropriate geological software, interpret and defend results, and disseminate results in reports, posters, and class presentations. The projects are from three upper division courses, Carbonate Systems, Sequence Stratigraphy, and Geophysical Systems, where teams of two to four students are presented with defined problems of durations ranging from a few weeks to an entire semester. Project goals and location, some background information, and specified dates and expectations for interim and final written and oral reports are provided to students. Some projects require the entire class to work on one data set, some require each team to be initially responsible for a portion of the project with teams ultimately merging data for interpretation and to arrive at final conclusions. Some projects require students to utilize data from appropriate geological web sites such as state geological surveys. Others require students to design surveys and utilize appropriate instruments of their choice for field data collection. Students learn usage and applications of appropriate geological software in compiling, processing, modeling, and interpreting data and preparing formal reports and presentations. Students uniformly report heightened interest and motivation when engaged in these projects. Our new curriculum has resulted in an increase in students" quantitative and interpretive skills along with dramatic improvement in communication and

  3. A Hybrid MCDM Approach for Strategic Project Portfolio Selection of Agro By-Products

    Directory of Open Access Journals (Sweden)

    Animesh Debnath

    2017-07-01

    Full Text Available Due to the increasing size of the population, society faces several challenges for sustainable and adequate agricultural production, quality, distribution, and food safety in the strategic project portfolio selection (SPPS. The initial adaptation of strategic portfolio management of genetically modified (GM Agro by-products (Ab-Ps is a huge challenge in terms of processing the agro food product supply-chain practices in an environmentally nonthreatening way. As a solution to the challenges, the socio-economic characteristics for SPPS of GM food purchasing scenarios are studied. Evaluation and selection of the GM agro portfolio management are the dynamic issues due to physical and immaterial criteria involving a hybrid multiple criteria decision making (MCDM approach, combining modified grey Decision-Making Trial and Evaluation Laboratory (DEMATEL, Multi-Attributive Border Approximation area Comparison (MABAC and sensitivity analysis. Evaluation criteria are grouped into social, differential and beneficial clusters, and the modified DEMATEL procedure is used to derive the criteria weights. The MABAC method is applied to rank the strategic project portfolios according to the aggregated preferences of decision makers (DMs. The usefulness of the proposed research framework is validated with a case study. The GM by-products are found to be the best portfolio. Moreover, this framework can unify the policies of agro technological improvement, corporate social responsibility (CSR and agro export promotion.

  4. 24 CFR 266.510 - HFA responsibilities.

    Science.gov (United States)

    2010-04-01

    ... HOUSING FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Project... accordance with the physical inspection procedures in 24 CFR part 5, subpart G. (b) Annual audits of projects. The HFA must analyze projects' annual audits and provide a copy to HUD along with a summary of...

  5. 24 CFR 200.222 - Certification of previous record on basis of a master list.

    Science.gov (United States)

    2010-04-01

    ... providing HUD with a complete master list, acceptable to the Participation Control Officer, of all projects... subsequent occurrences with respect to the projects on the master list as well as subsequent projects). Partners, corporate officers, directors and stockholders may likewise refer to and thereby incorporate...

  6. Uninformative variable elimination assisted by Gram-Schmidt Orthogonalization/successive projection algorithm for descriptor selection in QSAR

    DEFF Research Database (Denmark)

    Omidikia, Nematollah; Kompany-Zareh, Mohsen

    2013-01-01

    Employment of Uninformative Variable Elimination (UVE) as a robust variable selection method is reported in this study. Each regression coefficient represents the contribution of the corresponding variable in the established model, but in the presence of uninformative variables as well as colline......Employment of Uninformative Variable Elimination (UVE) as a robust variable selection method is reported in this study. Each regression coefficient represents the contribution of the corresponding variable in the established model, but in the presence of uninformative variables as well...... as collinearity reliability of the regression coefficient's magnitude is suspicious. Successive Projection Algorithm (SPA) and Gram-Schmidt Orthogonalization (GSO) were implemented as pre-selection technique for removing collinearity and redundancy among variables in the model. Uninformative variable elimination...

  7. THE zCOSMOS-SINFONI PROJECT. I. SAMPLE SELECTION AND NATURAL-SEEING OBSERVATIONS

    Energy Technology Data Exchange (ETDEWEB)

    Mancini, C.; Renzini, A. [INAF-OAPD, Osservatorio Astronomico di Padova, Vicolo Osservatorio 5, I-35122 Padova (Italy); Foerster Schreiber, N. M.; Hicks, E. K. S.; Genzel, R.; Tacconi, L.; Davies, R. [Max-Planck-Institut fuer Extraterrestrische Physik, Giessenbachstrasse, D-85748 Garching (Germany); Cresci, G. [Osservatorio Astrofisico di Arcetri (OAF), INAF-Firenze, Largo E. Fermi 5, I-50125 Firenze (Italy); Peng, Y.; Lilly, S.; Carollo, M.; Oesch, P. [Institute of Astronomy, Department of Physics, Eidgenossische Technische Hochschule, ETH Zurich CH-8093 (Switzerland); Vergani, D.; Pozzetti, L.; Zamorani, G. [INAF-Bologna, Via Ranzani, I-40127 Bologna (Italy); Daddi, E. [CEA-Saclay, DSM/DAPNIA/Service d' Astrophysique, F-91191 Gif-Sur Yvette Cedex (France); Maraston, C. [Institute of Cosmology and Gravitation, University of Portsmouth, Dennis Sciama Building, Burnaby Road, PO1 3HE Portsmouth (United Kingdom); McCracken, H. J. [IAP, 98bis bd Arago, F-75014 Paris (France); Bouche, N. [Department of Physics, University of California, Santa Barbara, CA 93106 (United States); Shapiro, K. [Aerospace Research Laboratories, Northrop Grumman Aerospace Systems, Redondo Beach, CA 90278 (United States); and others

    2011-12-10

    The zCOSMOS-SINFONI project is aimed at studying the physical and kinematical properties of a sample of massive z {approx} 1.4-2.5 star-forming galaxies, through SINFONI near-infrared integral field spectroscopy (IFS), combined with the multiwavelength information from the zCOSMOS (COSMOS) survey. The project is based on one hour of natural-seeing observations per target, and adaptive optics (AO) follow-up for a major part of the sample, which includes 30 galaxies selected from the zCOSMOS/VIMOS spectroscopic survey. This first paper presents the sample selection, and the global physical characterization of the target galaxies from multicolor photometry, i.e., star formation rate (SFR), stellar mass, age, etc. The H{alpha} integrated properties, such as, flux, velocity dispersion, and size, are derived from the natural-seeing observations, while the follow-up AO observations will be presented in the next paper of this series. Our sample appears to be well representative of star-forming galaxies at z {approx} 2, covering a wide range in mass and SFR. The H{alpha} integrated properties of the 25 H{alpha} detected galaxies are similar to those of other IFS samples at the same redshifts. Good agreement is found among the SFRs derived from H{alpha} luminosity and other diagnostic methods, provided the extinction affecting the H{alpha} luminosity is about twice that affecting the continuum. A preliminary kinematic analysis, based on the maximum observed velocity difference across the source and on the integrated velocity dispersion, indicates that the sample splits nearly 50-50 into rotation-dominated and velocity-dispersion-dominated galaxies, in good agreement with previous surveys.

  8. 78 FR 65695 - 30-Day Notice of Proposed Information Collection: Technical Processing Requirements for...

    Science.gov (United States)

    2013-11-01

    ... Information Collection: Technical Processing Requirements for Multifamily Project Mortgage Insurance AGENCY: Office of the Chief Information Officer, HUD. ACTION: Correction, notice. SUMMARY: On October 25, 2013 at... Collection Title of Information Collection: Technical Processing Requirements for Multifamily Project...

  9. A cluster randomized Hybrid Type III trial testing an implementation support strategy to facilitate the use of an evidence-based practice in VA homeless programs.

    Science.gov (United States)

    Smelson, David A; Chinman, Matthew; McCarthy, Sharon; Hannah, Gordon; Sawh, Leon; Glickman, Mark

    2015-05-28

    The Housing and Urban Development-Veterans Affairs Supportive Housing (HUD-VASH) program is one of the largest initiatives to end Veteran homelessness. However, mental health and substance use disorders continue to reduce client stability and impede program success. HUD-VASH programs do not consistently employ evidence-based practices that address co-occurring mental health and substance use disorders. This paper presents a study protocol to evaluate the implementation of an evidence-based, co-occurring disorder treatment called Maintaining Independence and Sobriety Through Systems Integration, Outreach, and Networking-Veterans Edition (MISSION-Vet) in HUD-VASH using an implementation strategy called Getting To Outcomes (GTO). In three large VA Medical Centers, this Hybrid Type III trial will randomize case managers and their clients by HUD-VASH sub-teams to receive either MISSION-Vet Implementation as Usual (IU-standard training and access to the MISSION-Vet treatment manuals) or MISSION-Vet implementation augmented by GTO. In addition to testing GTO, effectiveness of the treatment (MISSION-Vet) will be assessed using existing Veteran-level data from the HUD-VASH data monitoring system. This project will compare GTO and IU case managers and their clients on the following variables: (1) fidelity to the MISSION-Vet intervention; (2) proportion of time the Veteran is housed; (3) mental health, substance use, and functional outcomes among Veterans; and (4) factors key to the successful deployment of a new treatment as specified by the Reach, Effectiveness, Adoption, Implementation, and Maintenance (RE-AIM) model. This project is an important step for developing an implementation strategy to increase adoption of evidence-based practice use in VA homeless programs, and to further examine efficacy of MISSION-Vet in HUD-VASH. This project has important implications for program managers, policy makers, and researchers within the homelessness field. VA Central IRB approval

  10. 24 CFR 266.638 - Issuance of HFA Debenture.

    Science.gov (United States)

    2010-04-01

    ... HOUSING FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Contract... the HFA time to foreclose and/or resell the project. HUD may provide a written extension of the five year term if the HFA certifies and provides documentation that the project owner has filed bankruptcy...

  11. Impact of non-target-site-resistance on herbicidal activity of imazamox on blackgrass (Alopecurus myosuroides Huds. in comparison to other ALS-graminicides

    Directory of Open Access Journals (Sweden)

    Sievernich, Bernd

    2014-02-01

    Full Text Available A black-grass (Alopecurus myosuroides Huds. resistance-monitoring conducted by BASF in 2010 - 2012 revealed a high number of accessions with resistance against imazamox. However, application of imazamoxbased products in a winter crop was limited to winter beans in France and United Kingdom only until the introduction of the Clearfield®-production system in autumn 2012 in winter oilseed rape. It is therefore assumed that the resistance mechanisms were probably selected by the frequent use of ACCase- and ALSinhibitors in winter crop rotations during the last 2 decades. Resistance level for each product-biotype combination was calculated according the “R”-classification system (S, R?, RR, RRR by directly comparing the product performance on a biotype versus untreated control. Majority of resistant biotypes did not show a target-site mutation at the known codon Pro197 or Trp574. In order to better evaluate the impact of Non-Target-Site-Resistance (NTSR on the activity of BEYOND (imazamox, ATLANTIS WG (mesosulfuron+iodosulfuron and ABAK (pyroxsulam, biotypes who have shown an ALS-target-site mutation were removed from further analysis. At the dose rate of 35 g ai/ha BEYOND provided good activity on susceptible biotypes of black-grass almost matching up with ATLANTIS WG and ABAK. However, activity of BEYOND declined stronger on biotypes classified as R? or RR for that product, while ATLANTIS WG and ABAK hardly showed any decline in control on this group of biotypes when applied at the recommended dose rate. It is assumed that the underlying NTSR-mechanism is not effective enough yet to confer resistance to ATLANTIS WG and ABAK, but on BEYOND. In contrast, biotypes classified as R? for ATLANTIS WG did show a stronger impact on the activity of BEYOND and ABAK then of ATLANTIS WG. These differences in control level probably do translate into differences in selection pressure as well.

  12. Chemical composition, antimicrobial and antioxidant properties of Mentha longifolia (L. Huds. essential oil

    Directory of Open Access Journals (Sweden)

    Haris Nikšić

    2012-12-01

    Full Text Available Introduction: Present study describes the antimicrobial activity and free radical scavenging capacity (RSC of essential oil from Mentha longifolia (L. Huds. Aim of this study to investigate the quality, antimicrobial andantioxidant activity of wild species Mentha longifolia essential oil from Bosnia and Herzegovina.Methods: The chemical profi le of essential oil was evaluated by the means of gas chromatography-mass spectrometry (GC-MS and thin-layer chromatography (TLC. Antimicrobial activity was tested against 6bacterial strains. RSC was assessed by measuring the scavenging activity of essential oils on 2,2- diphenyl-1-picrylhydrazil (DPPH.Results: The main constituents of the essential oil of M. longifoliae folium were oxygenated monoterpenes,piperitone oxide (63.58% and 1,8-cineole (12.03%. Essential oil exhibited very strong antibacterial activity.The most important antibacterial activity essential oil was expressed on Gram negative strains: Escherichia coli, Pseudomonas aerginosa and Salmonella enterica. subsp.enterica serotype ABONY. Antioxidant activity was evaluated as a RSC. Investigated essential oil was able to reduce DPPH radicals into the neutral DPPHH form (IC50=10.5 μg/ml and this activity was dose –dependent.Conclusion: The study revealed signifi cant antimicrobial activity of the investigated essential oil. The examined oil exhibited high RSC, which was found to be in correlation to the content of mainly monoterpeneketones and aldehydes. These results indicate that essential oils could serve as safe antioxidant and antiseptic supplements in pharmaceuticals.

  13. 24 CFR 572.110 - Identifying and selecting eligible families for homeownership.

    Science.gov (United States)

    2010-04-01

    ... fair marketing responsibilities, described in § 572.405(e), that apply whenever homeownership... general rights and responsibilities of homeownership. (d) Social security numbers; wage and claims... other Federal, State, territorial, or local program approved by HUD as equivalent. (c) Responsibilities...

  14. Project management: a case of fixed price IS/IT projects. Analysis of projects by project scopes

    Directory of Open Access Journals (Sweden)

    Miroslav Kral

    2012-10-01

    Full Text Available The paper provides an overview of major issues of IS / IT projects. Attention will be focused on projects that are implemented under a contract for a specified amount of work and fixed price. The main purpose of the paper is to analyse the project parameters in terms of the types of projects, and to confirm, or refuse, a hypothesis related to this. There is some evidence from the portfolio of projects that have been implemented by the international companies providing IT services. Regarding the localisation, CEE region was selected for our research. The outputs of the paper should be a contribution to managing IS/IT projects in IT service delivery organizations and for the support of innovative thinking about project management generally.

  15. Medium - Scale Projects Selection Using Multi-Objective Decision ...

    African Journals Online (AJOL)

    Sixty (60) questionnaires were administered to experienced technically oriented personnel in the study area for evaluating objective weights attached to various projects. Forty-five responded and their values of objective weights attached to project cost, environmental effects, reliability, implementability and sustainable ...

  16. Nuclear site selection studies

    International Nuclear Information System (INIS)

    Gharib, A.; Zohoorian Izadpanah, A.A.; Iranmanesh, H.

    2000-01-01

    It is of special importance, especially from the nuclear safety viewpoint, to select suitable sites for different nuclear structures with the considered future activities. Site selection sometimes involves high costs not necessarily for merely selecting of site but for some preliminary measures to be taken so as the site may have the necessary characteristics. The more suitable the natural characteristics of the site for the considered project, the more successful and efficient the project, the lower the project costs and the longer the project operation period. If so, the project will cause the growth of public culture and sustainable socioeconomic development. This paper is the result of the conclusion of numerous massive reports of this activity in the preliminary phase based on theories, practices and the related safety principles on this ground as well as the application of data and information of the past and a glance to the future. The conception of need for a site for medium structures and nuclear research projects and how to perform this process are presented step by step here with a scientific approach to its selection during the investigations. In this study, it is practically described how the site is selected, by determining and defining the characteristics of research and nuclear projects with medium structures and also its fitting to the optimum site. The discovered sites typically involve the best advantages in technical and economic aspects and no particular contrast with the concerned structures

  17. Climate projections FAQ

    Science.gov (United States)

    A.E. Daniels; J.F. Morrison; L.A. Joyce; N.L. Crookston; S.C. Chen; S.G. McNulty

    2012-01-01

    Climate scenarios offer one way to identify and examine the land management challenges posed by climate change. Selecting projections, however, requires careful consideration of the natural resources under study, and where and how they are sensitive to climate. Selection also depends on the robustness of different projections for the resources and geographic area of...

  18. 76 FR 24363 - HUD Multifamily Rental Projects: Regulatory Revisions

    Science.gov (United States)

    2011-05-02

    ... tenants in common borrowers will have an adverse economic impact on the borrower and result in...) fails to pay before delinquency any Taxes secured by a lien having priority over this Security... consistent with the President's executive order. V. Findings and Certifications Environmental Impact A...

  19. 77 FR 61157 - Final Fair Market Rents for the Housing Choice Voucher Program and Moderate Rehabilitation Single...

    Science.gov (United States)

    2012-10-05

    ... HMFA. Las Vegas-Paradise, NV MSA New Haven-Meriden, CT HMFA. North Port-Bradenton-Sarasota, FL MSA... areas of New Jersey, Anchorage and several non-metropolitan areas of Alaska, Dallas, TX and Burlington... Projects and Low-Income Housing Tax Credit Projects at Risk If a current HUD Section 8 project uses rents...

  20. 7 CFR 1944.529 - Project selection.

    Science.gov (United States)

    2010-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS... administering its programs. (3) The effectiveness of the current efforts by the applicant to assist low-income...-354 office. (10) The extent to which the project will be cost effective, including but not limited to...

  1. Analysis of an Interactive Technology Supported Problem-Based Learning STEM Project Using Selected Learning Sciences Interest Areas (SLSIA)

    Science.gov (United States)

    Kumar, David Devraj

    2017-01-01

    This paper reports an analysis of an interactive technology-supported, problem-based learning (PBL) project in science, technology, engineering and mathematics (STEM) from a Learning Sciences perspective using the Selected Learning Sciences Interest Areas (SLSIA). The SLSIA was adapted from the "What kinds of topics do ISLS [International…

  2. 34 CFR 361.32 - Use of profitmaking organizations for on-the-job training in connection with selected projects.

    Science.gov (United States)

    2010-07-01

    ... on-the-job training in connection with selected projects. The State plan must assure that the... purpose of providing, as vocational rehabilitation services, on-the-job training and related programs for... 34 Education 2 2010-07-01 2010-07-01 false Use of profitmaking organizations for on-the-job...

  3. 24 CFR 266.120 - Actions for which sanctions may be imposed.

    Science.gov (United States)

    2010-04-01

    ... AUTHORITIES HOUSING FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Housing Finance Agency Requirements § 266.120 Actions for which sanctions may be imposed. Results of... provisions with respect to individual projects; (12) Maintain a default ratio acceptable to HUD relative to...

  4. 76 FR 18217 - Environmental Impacts Statements; Notice of Availability

    Science.gov (United States)

    2011-04-01

    .... 20110089, Draft EIS, HUD, CA, West Coast Recycling Group Metal Recycling Facility Project, Proposal to Develop and Operate a Scrap Metal Shredding and Recycling Facility at the Port of West Sacramento, Yolo..., Draft EIS, USFS, MN, Federal Hardrock Mineral Prospecting Permits Project, To Conduct Mineral...

  5. 24 CFR 266.105 - Application requirements.

    Science.gov (United States)

    2010-04-01

    ... HOUSING FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Housing Finance Agency Requirements § 266.105 Application requirements. (a) Applications for approval as a HUD...

  6. The APOSTLE project: Local Group kinematic mass constraints and simulation candidate selection

    Science.gov (United States)

    Fattahi, Azadeh; Navarro, Julio F.; Sawala, Till; Frenk, Carlos S.; Oman, Kyle A.; Crain, Robert A.; Furlong, Michelle; Schaller, Matthieu; Schaye, Joop; Theuns, Tom; Jenkins, Adrian

    2016-03-01

    We use a large sample of isolated dark matter halo pairs drawn from cosmological N-body simulations to identify candidate systems whose kinematics match that of the Local Group (LG) of galaxies. We find, in agreement with the `timing argument' and earlier work, that the separation and approach velocity of the Milky Way (MW) and Andromeda (M31) galaxies favour a total mass for the pair of ˜5 × 1012 M⊙. A mass this large, however, is difficult to reconcile with the small relative tangential velocity of the pair, as well as with the small deceleration from the Hubble flow observed for the most distant LG members. Halo pairs that match these three criteria have average masses a factor of ˜2 times smaller than suggested by the timing argument, but with large dispersion. Guided by these results, we have selected 12 halo pairs with total mass in the range 1.6-3.6 × 1012 M⊙ for the APOSTLE project (A Project Of Simulating The Local Environment), a suite of hydrodynamical resimulations at various numerical resolution levels (reaching up to ˜104 M⊙ per gas particle) that use the subgrid physics developed for the EAGLE project. These simulations reproduce, by construction, the main kinematics of the MW-M31 pair, and produce satellite populations whose overall number, luminosities, and kinematics are in good agreement with observations of the MW and M31 companions. The APOSTLE candidate systems thus provide an excellent testbed to confront directly many of the predictions of the Λ cold dark matter cosmology with observations of our local Universe.

  7. Potential Science and Technology Game Changers for the Ground Warfare of 2050: Selected Projections Made in 2017

    Science.gov (United States)

    2018-02-01

    ARL-TR-8283 ● FEB 2018 US Army Research Laboratory Potential Science and Technology Game Changers for the Ground Warfare of 2050...Science and Technology Game Changers for the Ground Warfare of 2050: Selected Projections Made in 2017 by Alexander Kott Office of the Director...Brian Sadler Vehicle Technology Directorate, ARL Ananthram Swami Computational and Information Sciences Directorate, ARL Approved for

  8. 77 FR 64822 - Notice of Submission of Proposed Information Collection to OMB; Rental Assistance Demonstration...

    Science.gov (United States)

    2012-10-23

    ... contracts; and Rent Supplement (Rent Supp), Rental Assistance Payment (RAP), and Mod Rehab properties, upon contract expiration or termination, to convert tenant protection vouchers (TPVs) to project-based vouchers... rights and duties of the applicant and HUD, with respect to the converted project and any payments under...

  9. 76 FR 8278 - Special Conditions: Gulfstream Model GVI Airplane; Enhanced Flight Vision System

    Science.gov (United States)

    2011-02-14

    ... image transparency; --Image alignment; --Lack of significant distortion; and --The potential for pilot... projects a video image derived from a forward-looking infrared (FLIR) camera through the head-up display (HUD). The EFVS image is projected in the center of the ``pilot compartment view,'' which is governed...

  10. Summary of computational support and general documentation for computer code (GENTREE) used in Office of Nuclear Waste Isolation Pilot Salt Site Selection Project

    International Nuclear Information System (INIS)

    Beatty, J.A.; Younker, J.L.; Rousseau, W.F.; Elayat, H.A.

    1983-01-01

    A Decision Tree Computer Model was adapted for the purposes of a Pilot Salt Site Selection Project conducted by the Office of Nuclear Waste Isolation (ONWI). A deterministic computer model was developed to structure the site selection problem with submodels reflecting the five major outcome categories (Cost, Safety, Delay, Environment, Community Impact) to be evaluated in the decision process. Time-saving modifications were made in the tree code as part of the effort. In addition, format changes allowed retention of information items which are valuable in directing future research and in isolation of key variabilities in the Site Selection Decision Model. The deterministic code was linked to the modified tree code and the entire program was transferred to the ONWI-VAX computer for future use by the ONWI project

  11. 24 CFR 55.1 - Purpose and basic responsibility.

    Science.gov (United States)

    2010-04-01

    ..., construction, improvement, disposition, financing and use of properties located in a floodplain for which... the executive order in the project approval decision making processes of HUD and of grant recipients...

  12. Selecting Map Projections in Minimizing Area Distortions in GIS Applications

    Directory of Open Access Journals (Sweden)

    Ahmet Kaya

    2008-12-01

    Full Text Available Varioussoftware for Geographical Information Systems (GISs have been developed and used in many different engineering projects. In GIS applications, map coverage is important in terms of performing reliable and meaningful queries. Map projections can be conformal, equal-area and equidistant. The goal of an application plays an important role in choosing one of those projections. Choosing the equal-area projection for an application in which area information is used (forestry, agriculture, ecosystem etc reduces the amount of distortion on the area, but many users using GIS ignore this fact and continue to use applications with present map sheets no matter in what map projection it is. For example, extracting area information from data whose country system’s map sheet is in conformal projection is relatively more distorted, compared to an equal-area projection one. The goal of this study is to make the best decision in choosing the most proper equal-area projection among the choices provided by ArcGIS 9.0, which is a popular GIS software package, and making a comparison on area errors when conformal projection is used. In this study, the area of parcels chosen in three different regions and geographic coordinates and whose sizes vary between 0.01 to 1,000,000 ha are calculated according to Transversal Mercator (TM, 3°, Universal Transversal Mercator (UTM, 6° and 14 different equal-area projections existing in the ArcGIS 9.0 GIS software package. The parcel areas calculated with geographical coordinates are accepted as definite. The difference between the sizes calculated according to projection coordinates and real sizes of the parcels are determined. Consequently, the appropriate projections are decided for the areas smaller and equal than 1,000 ha and greater than 1,000 ha in the GIS software package.

  13. The ENTRIA project. Selected disciplinary and interdisciplinary research topics; Das ENTRIA-Projekt. Ausgewaehlte disziplinaere und interdisziplinaere Forschungsthemen

    Energy Technology Data Exchange (ETDEWEB)

    Roehlig, Klaus-Juergen [Technical Univ. Clausthal, Clausthal-Zellerfeld (Germany); Hocke, Peter [KIT Karlsruhe (Germany). Inst. for Technology Assessment and Systems Analysis; Smeddinck, Ulrich [Braunschweig Technical Univ. Braunschweig (Germany); Walther, Clemens [Hannover Univ. (Germany). Inst. for Radioecology and Radiation Protection

    2015-07-01

    ENTRIA (''Disposal Options for Radioactive Residues: Interdisciplinary Analyses and Development of Evaluation Principles'', www.entria.de) is a joint research project carried out by twelve departments and institutes from German universities and major research institutions and one partner from Switzerland. It is financed by the German Ministry of Education and Research (BMBF). Scientists representing natural sciences, civil engineering, philosophy, law, social and political sciences, and technology assessment carry out disciplinary and interdisciplinary research addressing three options to manage especially high-level radioactive waste: - Final disposal in deep geological formations without any arrangements for retrieval, - disposal in deep geological formations with arrangements for monitoring and retrieval, and - (prolonged) surface (or near-surface) storage. In the paper, the following selected research topics - both disciplinary and interdisciplinary - are briefly introduced in order to provide an impression of the project scope: - Surface storage, - reference concepts for emplacement in deep geological formations with retrievability and monitoring, - radiation exposure and justification of measures, - interdisciplinary perspectives on dose limits, - comparative studies on nuclear waste governance, - nuclear waste governance in Switzerland, - public involvement and the German Site Selection Act, and - citizens' jury.

  14. Dynamic angle selection in X-ray computed tomography

    Energy Technology Data Exchange (ETDEWEB)

    Dabravolski, Andrei, E-mail: andrei.dabravolski@uantwerpen.be [iMinds-Vision Lab, University of Antwerp, Universiteitsplein 1, 2610 Wilrijk (Belgium); Batenburg, Kees Joost, E-mail: joost.batenburg@uantwerpen.be [iMinds-Vision Lab, University of Antwerp, Universiteitsplein 1, 2610 Wilrijk (Belgium); Centrum Wiskunde and Informatica (CWI), Science Park 123, 1098 XG Amsterdam (Netherlands); Sijbers, Jan, E-mail: jan.sijbers@uantwerpen.be [iMinds-Vision Lab, University of Antwerp, Universiteitsplein 1, 2610 Wilrijk (Belgium)

    2014-04-01

    Highlights: • We propose the dynamic angle selection algorithm for CT scanning. • The approach is based on the concept of information gain over a set of solutions. • Projection angles are selected based on the already available projection data. • The approach can lead to more accurate results from fewer projections. - Abstract: In X-ray tomography, a number of radiographs (projections) are recorded from which a tomogram is then reconstructed. Conventionally, these projections are acquired equiangularly, resulting in an unbiased sampling of the Radon space. However, especially in case when only a limited number of projections can be acquired, the selection of the angles has a large impact on the quality of the reconstructed image. In this paper, a dynamic algorithm is proposed, in which new projection angles are selected by maximizing the information gain about the object, given the set of possible new angles. Experiments show that this approach can select projection angles for which the accuracy of the reconstructed image is significantly higher compared to the standard angle selections schemes.

  15. Dynamic angle selection in X-ray computed tomography

    International Nuclear Information System (INIS)

    Dabravolski, Andrei; Batenburg, Kees Joost; Sijbers, Jan

    2014-01-01

    Highlights: • We propose the dynamic angle selection algorithm for CT scanning. • The approach is based on the concept of information gain over a set of solutions. • Projection angles are selected based on the already available projection data. • The approach can lead to more accurate results from fewer projections. - Abstract: In X-ray tomography, a number of radiographs (projections) are recorded from which a tomogram is then reconstructed. Conventionally, these projections are acquired equiangularly, resulting in an unbiased sampling of the Radon space. However, especially in case when only a limited number of projections can be acquired, the selection of the angles has a large impact on the quality of the reconstructed image. In this paper, a dynamic algorithm is proposed, in which new projection angles are selected by maximizing the information gain about the object, given the set of possible new angles. Experiments show that this approach can select projection angles for which the accuracy of the reconstructed image is significantly higher compared to the standard angle selections schemes

  16. So many developers, so many projects: toward a motivation-based theory of project selection

    NARCIS (Netherlands)

    van Osch, W.; Adelaar, T.; Pith, M.

    2011-01-01

    Studies into open source software (OSS) development projects have hitherto focused on the question of why people aremotivated to contribute to these projects, thereby assuming that motivational factors are the same across all types of OSSprojects. In this study we challenge this assumption by

  17. EPRTM project experience: selection of partners and supply chain; Experiencia en Proyectos de EPTTM: seleccion de socios y cadena de suministros

    Energy Technology Data Exchange (ETDEWEB)

    Lorenzo, D. de

    2012-07-01

    With 4 EPRTM units under construction, the new plants to be built in the following years will benefit from the return on experience of the work already performed. The knowledge about licensing processes, detail engineering, supply chain, logistics and on-site work gathered from the Olkiluoto 3 and Flamanville 3 projects has already been used in the Taishan 1 and 2 project, resulting in a project that is on schedule and on budget. This article will show how the advantage of such broad experience gained will be used to benefit future projects to ensure certainty of completion, leaving few and limited unresolved issues even before the beginning of the project. Several areas that are not usually tackled when speaking of a New Build project will be covered by this text from the point of view of a nuclear vendor: Project Partnership Selection and the Gate Review Process applied by AREVA in the supply chain of the main components. (Author)

  18. FY11 Coc Awards

    Data.gov (United States)

    Department of Housing and Urban Development — This report displays the renewal homeless assistance projects being awarded by HUD under the 2011 Continuum of Care (CoC) competitive grants process. Approximately...

  19. Selection of dominant radionuclides for Phase 1 of the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    Napier, B.A.

    1991-07-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation dose that individuals could have received as a result of emissions from nuclear operations at Hanford since their inception in 1944. A vital step in the estimation of radiation doses is the determination of the source term,'' that is, the quantities of radionuclides that were released to the environment from the various Hanford operations. Hanford operations have at various times involved hundreds of different radionuclides, some in relatively large quantities. Those radionuclides present in the largest quantities, although significant from an operational handling point of view, may not necessarily have been those of greatest concern for offsite radiation dose. This report documents the selection of the dominant radionuclides (those that may have resulted in the largest portion of the received doses) in the source term for Phase 1 of the HEDR Project, that is, for atmospheric releases from 1944 through 1947 and for surface water releases from 1964 through 1966. 15 refs., 3 figs., 10 tabs.

  20. 24 CFR 91.225 - Certifications.

    Science.gov (United States)

    2010-04-01

    ... provided family violence prevention or treatment services under any project assisted under the ESG program, including protection against the release of the address or location of any family violence shelter project... be included in the annual submission to HUD. (See definition of “certification” in § 91.5.) (1...

  1. 75 FR 30846 - Monthly Report of Excess Income and Annual Report of Uses of Excess Income (Correction)

    Science.gov (United States)

    2010-06-02

    ... Income and Annual Report of Uses of Excess Income (Correction) AGENCY: Office of the Chief Information.... Project owners are permitted to retain Excess Income for projects under terms and conditions established by HUD. Owners must request to retain some or all of their Excess Income. The request must be...

  2. Geothermal Reservoir Technology Research Program: Abstracts of selected research projects

    Energy Technology Data Exchange (ETDEWEB)

    Reed, M.J. (ed.)

    1993-03-01

    Research projects are described in the following areas: geothermal exploration, mapping reservoir properties and reservoir monitoring, and well testing, simulation, and predicting reservoir performance. The objectives, technical approach, and project status of each project are presented. The background, research results, and future plans for each project are discussed. The names, addresses, and telephone and telefax numbers are given for the DOE program manager and the principal investigators. (MHR)

  3. Scarab/Saffron Development Project Case study: Material Selection Criteria for the Monoethylene Glycol Recovery Package

    International Nuclear Information System (INIS)

    Moussa, A.M.; Habib, S.; Shinaishin, A.

    2004-01-01

    MEG Recovery Unit for Scarab/Saffron development project is the first application in gas production. The Mono Ethylene Glycol Recovery Unit (MEG) recovers MEG from Water/MEG stream and removes salts and other contaminants. MEG Recovery Unit Equipment Design Criteria were designed for two parallel trains A and B, each train is capable to treat 500 bbl MEG, 1500 bbl water and 9 ton salt. The MEG unit is a combination of two unit operations; MEG Recovery unit is normally applicable in the oil and gas industries that is applying distillation technique, while the new technology is salt treatment and handling. The MEG Unit material selection is made to be suitable for the entire design life which is 25 years, the materials for MEG Recovery Unit have been selected among the available corrosion resistance alloys, where requested by the service and ambient conditions. Therefore all. the parts of the MEG unit that are in saline service are in either (2205 duplex, AISI 316L) and in Inconel alloy 625 related to operating temperature. This case study focused at Inconel alloy 625, which is selected for salt service and their operation problem occurred during the construction and operating conditions

  4. FY2010 CoC Competition Grants

    Data.gov (United States)

    Department of Housing and Urban Development — This report displays the homeless assistance projects being awarded by HUD under the 2010 Continuum of Care (CoC) competitive grants process. Approximately $1.411...

  5. Channel Selection and Feature Projection for Cognitive Load Estimation Using Ambulatory EEG

    Directory of Open Access Journals (Sweden)

    Tian Lan

    2007-01-01

    Full Text Available We present an ambulatory cognitive state classification system to assess the subject's mental load based on EEG measurements. The ambulatory cognitive state estimator is utilized in the context of a real-time augmented cognition (AugCog system that aims to enhance the cognitive performance of a human user through computer-mediated assistance based on assessments of cognitive states using physiological signals including, but not limited to, EEG. This paper focuses particularly on the offline channel selection and feature projection phases of the design and aims to present mutual-information-based techniques that use a simple sample estimator for this quantity. Analyses conducted on data collected from 3 subjects performing 2 tasks (n-back/Larson at 2 difficulty levels (low/high demonstrate that the proposed mutual-information-based dimensionality reduction scheme can achieve up to 94% cognitive load estimation accuracy.

  6. 75 FR 56128 - Notice of Proposed Extension of a Currently Approved Information Collection: Comment Request...

    Science.gov (United States)

    2010-09-15

    .... Housing Discrimination Information Form HUD-903.1 (English language), HUD-903.1A (Spanish language), HUD-903-1B (Chinese language), HUD-903.1F (Vietnamese language), HUD-903.1KOR (Korean language), HUD-903.1C (Arabic language), HUD-903.1CAM (Cambodian language), HUD-903.1RUS (Russian language), and HUD-903...

  7. 78 FR 67179 - 60 Day Notice of Proposed Extension of a Currently Approved Information Collection: Housing...

    Science.gov (United States)

    2013-11-08

    .... Housing Discrimination Information Form HUD-903.1 (English language), HUD-903.1A (Spanish language), HUD-903-1B (Chinese language), HUD-903.1F (Vietnamese language), HUD-903.1KOR (Korean language), HUD-903.1C (Arabic language), HUD-903.1CAM (Cambodian language), HUD-903.1RUS (Russian language), and HUD-903...

  8. ARRA NEPA Quarterly Report- First Report: HUD

    Data.gov (United States)

    Council on Environmental Quality, Executive Office of the President — Reports prepared by the Departments and Agencies on status of NEPA progress for activities and projects funded under Division A of the American Recovery and...

  9. 24 CFR 886.302 - Definitions.

    Science.gov (United States)

    2010-04-01

    ... SUPPORTIVE HOUSING FOR THE ELDERLY PROGRAM AND SECTION 811 SUPPORTIVE HOUSING FOR PERSONS WITH DISABILITIES... Program for the Disposition of HUD-Owned Projects § 886.302 Definitions. The terms Fair Market Rent (FMR...

  10. Nuclear Power Plant project site selection geotechnical considerations

    International Nuclear Information System (INIS)

    Katti, V.J.; Banerjee, D.C.

    1997-01-01

    During the selection of a site for Nuclear Power Plant (NPP) and Radioactive Waste Plant (RWP), geotechnical investigations play a significant role in deciding merits and demerits of the sites. Any accidents in these units can play havoc on mankind and may leave bitter imprints on generations to come. Hence proper care has to be taken at the early stage for selecting the sites. Site selection procedure is a complicated one, because it involves experts from various disciplines like geology, geophysics, civil, mechanical electrical engineering, health-physics and other fields

  11. FY2012 CoC Competition Grants (New and Renewal)

    Data.gov (United States)

    Department of Housing and Urban Development — This report displays the FY2012 renewal and new homeless assistance projects awarded by HUD for the FY2012 Continuum of Care (CoC) Program competition. Approximately...

  12. 77 FR 38309 - Notice of Regulatory Waiver Requests Granted for the First Quarter of Calendar Year 2012

    Science.gov (United States)

    2012-06-27

    ..., Washington, DC 20410, telephone (202) 708-3000. Regulation: 24 CFR 891.100(d). Project/Activity: Jack..., MA. Nature of Requirement: The objective of HUD's regulation at 24 CFR 902.20 is to determine whether...

  13. Project for Establishing a Selected Dissemination of Information Service for the Faculty Members at Education and Psychology Faculty, University of Tehran

    Directory of Open Access Journals (Sweden)

    Gholamreza Fadaei

    2012-02-01

    Full Text Available The project aim was to establish an SDI (Selected Dissemination of Information service for the faculty members at University of Tehran, faculty of psychology and education. The project was carried out during the 2006-2007 period. First, a three stage survey was conducted to identify the information needs which were then served using a current awareness service over the period. Findings confirmed that the SDI project significantly impacted on the faculty information seeking behavior. Furthermore, there had been evidence supporting the fact that it has also influenced the quality of instruction by facilitating the overall efficacy of information sources collected. It was the intent of researchers to expand this project at later stages to include all humanities faculties in the university and if possible at a national level.

  14. Target selection for the HRIBF Project

    International Nuclear Information System (INIS)

    Dellwo, J.; Alton, G.D.; Batchelder, J.C.

    1994-01-01

    Experiments are in progress at the Oak Ridge National Laboratory (ORNL) which are designed to select the most appropriate target materials for generating particular radioactive ion beams for the Holifield Radioactive Ion Beam Facility (HRIBF). The 25-MV tandem accelerator is used to implant stable complements of interesting radioactive elements into refractory targets mounted in a high-temperature FEBIAD ion source which is on-line at the UNISOR facility. These experiments permit selection of the target material most appropriate for the rapid release of the element of interest, as well as realistic estimates of the efficiency of the FEBIAD source. From diffusion release data information on the release times and diffusion coefficients can be derived. Diffusion coefficients for CI implanted into and diffused from CeS and Zr 5 Si 3 and As, Br, and Se implanted into and diffused from Zr 5 Ge 3 have been derived from the resulting intensity versus time profiles

  15. Optimal Site Selection of Wind-Solar Complementary Power Generation Project for a Large-Scale Plug-In Charging Station

    Directory of Open Access Journals (Sweden)

    Wenjun Chen

    2017-10-01

    Full Text Available The wind-solar hybrid power generation project combined with electric vehicle charging stations can effectively reduce the impact on the power system caused by the random charging of electric cars, contribute to the in-situ wind-solar complementary system and reduce the harm arising from its output volatility. In this paper, the site selection index system of a landscape complementary power generation project is established by using the statistical methods and statistical analysis in the literature. Subsequently, using the Analytic Network Process to calculate the index weight, a cloud model was used in combination with preference ranking organization method for enrichment evaluations to transform and sort uncertain language information. Finally, using the results of the decision-making for the location of the Shanghai wind-solar complementary project and by carrying out contrast analysis and sensitivity analysis, the superiority and stability of the decision model constructed in this study was demonstrated.

  16. Methodology for the selection of routes for international cross-border line projects involving multiple objectives and decision-makers in the analyses of restrictions and environmental possibilities

    International Nuclear Information System (INIS)

    Angel S, Enrique; Cadena, Luis Fernando

    2005-01-01

    A scheme was developed and applied to select the optimum environmental route for international cross-border line projects, in a decision making context involving multiple objectives and multiple decision-makers, the project studied was the electricity interconnection for central America (SIEPAC) for which a prospective assessment was carried out regarding the restrictions and possibilities in the light of the Colombian environmental dimensions management model. The methodology proposed followed these stages: Definition and approval of the structure of environmental restriction and criticality variables, sectorization and selection of complex sections, definition of decision-makers for multi-objective analysis; design and application of consultation tool; definition and modeling of options applying SIG; sensitivity analysis of alternative routes and project's environment management. Different options were identified for insertion and permanence of the project according to the criteria of various interest groups and actors consulted: environmental authorities, electricity companies, scientific community and civil society

  17. Agricultural biogas. Intermediate assessment - Biogas Mission. The Energivie Program - Projects of development of farm-based methanization. Site selection, Visits of installations, Consultation of installers

    International Nuclear Information System (INIS)

    Maurer, Michel

    2005-06-01

    A first document presents Alsace pilot projects: technical and economic recalls, site pre-selection, project leader, description of the mobilisation of lipid co-substrates (interest of fats, modalities), regulatory context (for biogas production, electric energy supply and digestate use). It also presents installer companies which have been consulted for these projects. Another document proposes technical and economical analyses of proposals made by installers, and an analysis of deadlocking points for these pilot projects. Technical, economic, and environmental elements, as well as those dealing with installation management, costs and construction delays to be provided by the consulted company are indicated and commented

  18. Selection and Specification of Rear-Projection Screens.

    Science.gov (United States)

    Vlahos, Petro

    1961-01-01

    The characteristics of the rear-projection screen are examined in detail. Numerical constants are provided that define these characteristics for practical screens and convert foot-candles to footlamberts. A procedure is given by which an optimum screen may be specified for a specific application. Contents include--(1) introduction, (2) projection…

  19. 24 CFR 886.336 - Audit.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Audit. 886.336 Section 886.336... the Disposition of HUD-Owned Projects § 886.336 Audit. (a) Where a State or local government is the eligible owner of a project receiving financial assistance under this part, the audit requirements in 24...

  20. A modification of the successive projections algorithm for spectral variable selection in the presence of unknown interferents.

    Science.gov (United States)

    Soares, Sófacles Figueredo Carreiro; Galvão, Roberto Kawakami Harrop; Araújo, Mário César Ugulino; da Silva, Edvan Cirino; Pereira, Claudete Fernandes; de Andrade, Stéfani Iury Evangelista; Leite, Flaviano Carvalho

    2011-03-09

    This work proposes a modification to the successive projections algorithm (SPA) aimed at selecting spectral variables for multiple linear regression (MLR) in the presence of unknown interferents not included in the calibration data set. The modified algorithm favours the selection of variables in which the effect of the interferent is less pronounced. The proposed procedure can be regarded as an adaptive modelling technique, because the spectral features of the samples to be analyzed are considered in the variable selection process. The advantages of this new approach are demonstrated in two analytical problems, namely (1) ultraviolet-visible spectrometric determination of tartrazine, allure red and sunset yellow in aqueous solutions under the interference of erythrosine, and (2) near-infrared spectrometric determination of ethanol in gasoline under the interference of toluene. In these case studies, the performance of conventional MLR-SPA models is substantially degraded by the presence of the interferent. This problem is circumvented by applying the proposed Adaptive MLR-SPA approach, which results in prediction errors smaller than those obtained by three other multivariate calibration techniques, namely stepwise regression, full-spectrum partial-least-squares (PLS) and PLS with variables selected by a genetic algorithm. An inspection of the variable selection results reveals that the Adaptive approach successfully avoids spectral regions in which the interference is more intense. Copyright © 2011 Elsevier B.V. All rights reserved.

  1. Innovative Approach for IBS Vendor Selection Problem

    Directory of Open Access Journals (Sweden)

    Omar Mohd Faizal

    2016-01-01

    Full Text Available Supply chain management in Industrialised Building System (IBS construction management has significantly determined the successful of company and project performance. Due to the wide variety of criteria and vendor available, the vendor selection process for a specific project needs is becoming more difficult. The need of decision aid for vendor selection in other areas is widely discussed in previous research. However, study on vendor selection for IBS project is largely neglected. Decision Support System (DSS is proposed for this purpose. Yet, most of the DSS models are impractical since they are complicated and difficult for a layman such as project managers to use. Research indicates that the rapid development of ICT has highly potential towards simple and effective DSS. Thus, this paper highlights the importance and research approach for vendor selection in IBS project management. The study is based on Design Science Research Methodology with combination of case studies. It is anticipates that this study will yield an effective value-for-money decision making platform to manage vendor selection process.

  2. 7 CFR 3570.67 - Project selection priorities.

    Science.gov (United States)

    2010-01-01

    ... points; or (4) Between 20,001 and 50,000, inclusive, when applicable—5 points. (b) Income priorities. The median household income of the population to be served by the proposed project is below the higher of the poverty line or: (1) 60 percent of the State nonmetropolitan median household income—30 points; (2) 70...

  3. Review of selected 100-N waste sites related to N-Springs remediation projects

    International Nuclear Information System (INIS)

    DeFord, D.H.; Carpenter, R.W.

    1996-01-01

    This document has been prepared in support of the environmental restoration program at the US Department of Energy's Hanford Site near Richland, Washington, by the Bechtel Hanford, Inc. Facility and Waste Site Research Office. It provides historical information that documents and characterizes selected waste sites that are related to the N-Springs remediation projects. The N-Springs are a series of small, inconspicuous groundwater seepage springs located along the Columbia River shoreline near the 100-N Reactor. The spring site is hydrologically down-gradient from several 100-N Area liquid waste sites that are believed to have been the source(s) of the effluents being discharged by the springs. This report documents and characterizes these waste sites, including the 116-N-1 Crib and Trench, 116-N-3 Crib and Trench, unplanned releases, septic tariks, and a backwash pond

  4. Participation of concerned citizens in site selection decisions

    International Nuclear Information System (INIS)

    Appel, D.

    2003-01-01

    The contribution presents preliminary results of two international projects aimed at integrating the general public, or parts thereof, in the decision process of selecting ultimate storage sites. The author participated in these projects and is a former member of the task group for selection of ultimate storage sites (Arbeitskreis Auswahlverfahren Endlagerstandorte - AkEnd). The two projects are: Forum on Stakeholder Confidence (FSC) of the Nuclear Energy Agency (NEA) OECD, Project 'COWAM' (Community Waste Management) of the European Commission. The participants, goals and methods of the two projects were different, but they both presented concrete methods of selecting ultimate storage sites from the view of different actors in the form of case studies. The focus was on the participation of the public and its importance for success. Apart from meeting technical requirements the selection process should also take account of the requirements of democracy and citizens' participation in order to gain wide acceptance for its results. Deficiencies and advantages of the proposed selection processes are analyzed, and general requirements on the decision process in site selection are derived. (orig.) [de

  5. Project Decision Chain

    DEFF Research Database (Denmark)

    Rolstadås, Asbjørn; Pinto, Jeffrey K.; Falster, Peter

    2015-01-01

    To add value to project performance and help obtain project success, a new framework for decision making in projects is defined. It introduces the project decision chain inspired by the supply chain thinking in the manufacturing sector and uses three types of decisions: authorization, selection......, and plan decision. A primitive decision element is defined where all the three decision types can be accommodated. Each task in the primitive element can in itself contain subtasks that in turn will comprise new primitive elements. The primitive elements are nested together in a project decision chain....

  6. A Decision Support Concept for a construction design projectselecting the type of glass façade

    Directory of Open Access Journals (Sweden)

    Franjo Šimić

    2017-01-01

    Full Text Available The paper describes research into the possibility of developing a concept for supporting decisions in planning construction projects (one of the most important stages of construction project management. The focus is on supporting decisions in selecting the type of and solution for the glass façade in the main design. Materials and types of soluteons for a glass façade were analyzed and alternative solutions were obtained. The concept was developed in that it included relevant stakeholders in the decision-making process during the construction design. These stakeholders were the investor, architect, and construction contractor. The analysis was carried out and a hierarchical structure of objectives was formed as a goal tree. The criteria at the last hierarchical level were used to evaluate alternative solutions for the glass façade, and their weights were determined by all stakeholders using the AHP method (Analytic Hierarchy Process. Using PROMETHEE (Preference Ranking Method for Enrichment Evaluation, a comparison of alternative solutions for the glass façade was conducted and the alternatives were ranked according to the priorities for inclusion into the main design. The concept was tested by selecting a type of glass façade on a residential-commercial building in the city of Rijeka, Croatia.

  7. 6 Sigma project advance

    International Nuclear Information System (INIS)

    2002-12-01

    This book deals with 6 sigma project advance which introduces 6 sigma project in Changwon special steel, how is failure accepted? CTQ selection which is starting line, definition of performance standard, measurement system check on reliability of measurement data, check of process capacity for current level, establishment of target, optimal design and performance of application, practice of management system for maintain of improved result, CTQ selection, check of measurement system and practice of management system.

  8. 77 FR 75641 - Public Housing Operating Subsidy-Appeals

    Science.gov (United States)

    2012-12-21

    ... substitute actual project cost data. To appeal the amount of subsidy on any one of the permitted bases of... conditions; and (e) appeal to substitute actual project cost data. To appeal the amount of subsidy on any one of the permitted bases of appeal, PHAs submit an appeal request to HUD. Number of Annual Hours per...

  9. 26 CFR 1.42-5 - Monitoring compliance with low-income housing credit requirements.

    Science.gov (United States)

    2010-04-01

    ... project, the 15-40 test under sections 42(g)(4) and 142 (d)(4)(B) for “deep rent skewed” projects; (ii... of Housing and Urban Development (HUD), 24 CFR 180.680, an adverse final decision by a substantially... in compliance at any time in the future, the Agency need not file Form 8823 in subsequent years to...

  10. 75 FR 76479 - Notice of Proposed Information Collection for Public Comment: County Data Record Project

    Science.gov (United States)

    2010-12-08

    ... forms of information technology; e.g., permitting electronic submission of responses. Title of Proposal... Associates Inc. and its subcontractors, Fairview Industries and Smart Data Strategies, is conducting a... activities. First, this database will give HUD an ability to track home sales, foreclosures and tax...

  11. 78 FR 66041 - 60-Day Notice of Proposed Information Collection: Multifamily Project Monthly Accounting Reports

    Science.gov (United States)

    2013-11-04

    ... calling the toll-free Federal Relay Service at (800) 877-8339. FOR FURTHER INFORMATION CONTACT: Harry... hearing or speech impairments may access this number through TTY by calling the toll-free Federal Relay....g., permitting electronic submission of responses. HUD encourages interested parties to submit...

  12. Sistemática proposta para seleção de fornecedores em gestão de projetos Systematic proposal for selecting suppliers in project management

    Directory of Open Access Journals (Sweden)

    Luciana Hazin Alencar

    2007-12-01

    Full Text Available A gestão de projetos vem sendo alvo de inúmeros estudos nos últimos anos, uma vez que os projetos estão se tornando cada vez mais complexos. Os fornecedores exercem papéis cruciais na gestão de projetos, estando envolvidos em uma rede de atividades conectadas que, se não desenvolvidas de forma adequada, podem comprometer o sucesso do projeto. Dessa forma, aumenta-se a necessidade de fornecedores qualificados, comprometidos com os objetivos do cliente e capazes de empreender os projetos solicitados. A questão abordada é a seleção de fornecedores para um empreendimento que atenda aos múltiplos objetivos dos decisores (representantes do cliente, de modo que desenvolvam um trabalho conjunto, reduzindo custos e promovendo melhorias nos processos construtivos, assegurando, a qualidade do produto final. Diante da complexidade do problema, propõe-se uma sistemática para seleção de fornecedores, que considera o processo de seleção integrada da equipe do projeto, mediante a revisão bibliográfica realizada.The project management has been the target of numerous studies in recent years since projects have become increasingly complex. The suppliers play crucial roles in project management being involved in a network of connected activities, which if not developed appropriatel, can compromise the success of the project. Hence, there has been a growing need for qualified suppliers, who are committed to the client’s objectives and are able to undertake the projects requested. The question brought up is the suppliers’ selection for a project according to the multiple criteria of the decision makers (clients representation , so they can undertake an integrated work reducing costs and providing improvements in the constructive processes, assuring the quality of the final product. Due to the complexity of the problem, a systematic proposal is put forward for selecting suppliers considering an integrated selection process of the project team

  13. A desk evaluation review of project RAF/4/004 nuclear instruments maintenance. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-04-15

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the outputs of a project. This project was originally intended for six selected countries in Africa, namely, Algeria, Egypt, Ghana, Libya, Zaire and Zambia. Ethiopia and Tanzania joined in 1993 and it has now been extended to two other countries, Madagascar and Sudan. This is a step forward towards developing the infrastructure for nuclear instrumentation and maintenance is as many countries in Africa as require this service. A project summary along with financial data and recommendations for improvements are given. A table where total assistance provided to ten selected african countries is included.

  14. A desk evaluation review of project RAF/4/004 nuclear instruments maintenance. Project desk evaluation

    International Nuclear Information System (INIS)

    1994-01-01

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the outputs of a project. This project was originally intended for six selected countries in Africa, namely, Algeria, Egypt, Ghana, Libya, Zaire and Zambia. Ethiopia and Tanzania joined in 1993 and it has now been extended to two other countries, Madagascar and Sudan. This is a step forward towards developing the infrastructure for nuclear instrumentation and maintenance is as many countries in Africa as require this service. A project summary along with financial data and recommendations for improvements are given. A table where total assistance provided to ten selected african countries is included

  15. The Phebus FP project

    International Nuclear Information System (INIS)

    Delchambre, P.; Von der Hardt, P.

    1989-01-01

    This report summarizes the pre-project studies concerning the PHEBUS FP facility. After recalling the programme objectives, it describes the projected modifications to the PHEBUS reactor, outlines new installations and justifies the selected options

  16. Portfolio theory in the selection of oil investment projects Teoria de carteiras na seleção de projetos de investimento em petróleo

    Directory of Open Access Journals (Sweden)

    Jalimar Guimarães Simplício

    2012-01-01

    Full Text Available The objective of this article is to compare investment project selection using the efficient frontier in the mean-variance space based on optimization models introduced by Markowitz (1952 with the project ranking method according to the profitability index (PI. The selection of real assets by companies did not incorporate the mean-variance optimization procedure in the same way the selection of financial assets in investment portfolios did. The process of selection and formation of portfolios of investment projects for the oil area of a company in the energy industry was analyzed. Project portfolios formed according to the usual company practice of ranking by their PI were compared with those that result from applying mean-variance optimization through Monte Carlo simulation, which allows the computation of mean returns, variances, and covariances for the set of projects considered. The inefficiency of project portfolios obtained by ranking according to the PI compared to those obtained by the method of Markowitz suggests that there are opportunities to improve the process of selecting the set of projects to be implemented by companies.O objetivo deste artigo é comparar a seleção de projetos de investimento segundo a fronteira eficiente no espaço média-variância com base em modelos de otimização introduzidos por Markowitz (1952 com o método do ordenamento de projetos segundo o índice de lucratividade (IL. A seleção de ativos reais pelas empresas não incorporou o procedimento de otimização de média-variância da mesma forma que na seleção de ativos financeiros para carteiras de investimento. O processo de seleção e formação de carteiras de projetos de investimento pela área de petróleo de uma empresa do setor de energia foi analisado. Carteiras de projetos constituídas de acordo com a prática usual da empresa de ordenamento pelo IL foram comparadas com as que resultariam da aplicação da otimização de m

  17. Multi-criteria decision-making in the selection of a renewable energy project in spain: The Vikor method

    International Nuclear Information System (INIS)

    San Cristobal, J.R.

    2011-01-01

    One of the characteristics of the Spanish energy system is its high degree of dependence on imports. In 2005, the Spanish government approved the new Renewable Energy Plan in the following sectors: Windpower, Hydroelectric, Solar Thermal, Solar Thermo-electric, Photovoltaic, Biomass, Biogas and Biofuels. The aim of the Plan is to make it possible to reach the target of 12% of primary energy being met from renewable sources by 2010. When selecting one from various Renewable Energy investment projects different groups of decision-makers become involved in the process. Decision-making has to take into consideration several conflicting objectives because of the increasingly complex social, economic, technological, and environmental factors that are present. Traditional single-criterion decision-making is no longer able to handle these problems. The Compromise Ranking method, also known as the VIKOR method, introduces the Multi-criteria ranking index based on the particular measure of ''closeness'' to the ''ideal'' solution. In this paper, we apply the method in the selection of a Renewable Energy project corresponding to the Renewable Energy Plan launched by the Spanish Government. The method is combined with the Analytical Hierarchy Process method for weighting the importance of the different criteria, which allows decision-makers to assign these values based on their preferences. The results show that the Biomass plant option (Co-combustion in a conventional power plant) is the best choice, followed by the Wind power and Solar Thermo-electric alternatives. (author)

  18. 75 FR 31462 - Notice of Proposed Information Collection: Comment Request; Record of Employee Interview

    Science.gov (United States)

    2010-06-03

    ... Information Collection: Comment Request; Record of Employee Interview AGENCY: Office of Labor Relations... information: Title of Proposal: Record of Employee Interview. OMB Control Number, if applicable: 2501-0009... include conducting interviews with laborers and mechanics employed on HUD-assisted projects concerning...

  19. IT Project Evaluation and Investment Decision

    Institute of Scientific and Technical Information of China (English)

    黄东兵; 张世英

    2004-01-01

    There are many kinds of real options,which are valuable,in each phase of the lifetime of an information technology(IT)project.However,in the current IT investment decision theory,real options that embedded in IT projects are not considered. In this paper, the process of IT project decision and implementation is fully analyzed, the real options that may be embedded in an IT project are identified, and a real option analysis (ROA) method is proposed for evaluation of an IT project under uncertain business environment. ROA employs Black-Scholes expansion model and cancels the assumption that the cost of project is certain. The numerical example manifests that the ROA can better evaluate IT project and select the IT investment alternative. Finally, a road map is provided to help selecting the suitable evaluation method to make IT investment decision.

  20. Mapping and industrial IT project to a 2nd semester design-build project

    DEFF Research Database (Denmark)

    Nyborg, Mads; Høgh, Stig

    2010-01-01

    CDIO means bringing the engineer's daily life and working practice into the educational system. In our opinion this is best done by selecting an appropriate project from industry. In this paper we describe how we have mapped an industrial IT project to a 2nd semester design-build project in the D......CDIO means bringing the engineer's daily life and working practice into the educational system. In our opinion this is best done by selecting an appropriate project from industry. In this paper we describe how we have mapped an industrial IT project to a 2nd semester design-build project...... in the Diploma IT program at the Technical University of Denmark. The system in question is a weighing system operating in a LAN environment. The system is used in the medical industry for producing tablets. We present the design of a curriculum to support the development of major components of the weighing...... system. A simple teaching model for software engineering is presented which combines technical disciplines with disciplines from section 2-4 in the CDIO syllabus. The implementation of a joint project involving several courses supports the CDIO perspective. Already the traditional IT-diploma education...

  1. 28 CFR 34.3 - Selection criteria.

    Science.gov (United States)

    2010-07-01

    ... achievement of project objectives; (4) The project management structure is adequate to the successful conduct of the project; (5) Organizational capability is demonstrated at a level sufficient to successfully....3 Selection criteria. (a) All individual project applications will, at a minimum, be subject to...

  2. High Selectivity Oxygen Delignification

    Energy Technology Data Exchange (ETDEWEB)

    Lucian A. Lucia

    2005-11-15

    Project Objective: The objectives of this project are as follows: (1) Examine the physical and chemical characteristics of a partner mill pre- and post-oxygen delignified pulp and compare them to lab generated oxygen delignified pulps; (2) Apply the chemical selectivity enhancement system to the partner pre-oxygen delignified pulps under mill conditions (with and without any predetermined amounts of carryover) to determine how efficiently viscosity is preserved, how well selectivity is enhanced, if strength is improved, measure any yield differences and/or bleachability differences; and (3) Initiate a mill scale oxygen delignification run using the selectivity enhancement agent, collect the mill data, analyze it, and propose any future plans for implementation.

  3. 77 FR 22334 - Authority To Accept Unsolicited Research Proposals

    Science.gov (United States)

    2012-04-13

    ... how HUD assistance can be used to improve educational outcomes and early learning and development... housing providers are increasingly using housing technology to improve energy efficiency or to introduce..., or (4) housing technology. In accordance with statutory requirements, the research projects must be...

  4. 75 FR 39034 - Public Housing Annual Contributions Contract

    Science.gov (United States)

    2010-07-07

    ... Contributions Contract AGENCY: Office of the Chief Information Officer, HUD. ACTION: Notice. SUMMARY: The... Contributions Contract (ACC) with certain requirements applicable to all project and other requirements... Contributions Contract. OMB Approval Number: 2577-New. Form Numbers: Certain information collections do not have...

  5. 24 CFR 990.185 - Utilities expense level: Incentives for energy conservation/rate reduction.

    Science.gov (United States)

    2010-04-01

    ... (of the type affected by the energy conservation measure) after implementation of the energy...) Utility benchmarking. HUD will pursue benchmarking utility consumption at the project level as part of the... convene a meeting with representation of appropriate stakeholders to review utility benchmarking options...

  6. Optimal fringe angle selection for digital fringe projection technique.

    Science.gov (United States)

    Wang, Yajun; Zhang, Song

    2013-10-10

    Existing digital fringe projection (DFP) systems mainly use either horizontal or vertical fringe patterns for three-dimensional shape measurement. This paper reveals that these two fringe directions are usually not optimal where the phase change is the largest to a given depth variation. We propose a novel and efficient method to determine the optimal fringe angle by projecting a set of horizontal and vertical fringe patterns onto a step-height object and by further analyzing two resultant phase maps. Experiments demonstrate the existence of the optimal angle and the success of the proposed optimal angle determination method.

  7. Contractor Selection in Saudi Arabia

    OpenAIRE

    M. A. Bajaber; M. A. Taha

    2012-01-01

    Contractor selection in Saudi Arabia is very important due to the large construction boom and the contractor role to get over construction risks. The need for investigating contractor selection is due to the following reasons; large number of defaulted or failed projects (18%), large number of disputes attributed to contractor during the project execution stage (almost twofold), the extension of the General Agreement on Tariffs and Trade (GATT) into construction industry, and finally the few ...

  8. A new approach to cost effective projects: High performance project teams

    International Nuclear Information System (INIS)

    Chambers, N.C.

    1994-01-01

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment

  9. A new approach to cost effective projects: High performance project teams

    Energy Technology Data Exchange (ETDEWEB)

    Chambers, N.C. [Brown and Root Energy Services (United Kingdom)

    1994-12-31

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment

  10. Comparative study of biological activities and phytochemical composition of two rose hips and their preserves: Rosa canina L. and Rosa arvensis Huds.

    Science.gov (United States)

    Nađpal, Jelena D; Lesjak, Marija M; Šibul, Filip S; Anačkov, Goran T; Četojević-Simin, Dragana D; Mimica-Dukić, Neda M; Beara, Ivana N

    2016-02-01

    The aim of this study was to compare phenolic profile, vitamin C content, antioxidant, anti-inflammatory and cytotoxic activity of rose hips and the preserves (purée and jam) of two Rosa species: renowned Rosa canina L. and unexplored Rosa arvensis Huds. The liquid chromatography-tandem mass spectrometry analysis of 45 phenolics resulted in quantification of 14 compounds, with quercitrin, gallic and protocatechuic acids as the most dominant. High antioxidant potential of R. canina and a moderate activity of R. arvensis extracts were determined through several assays. Purée of both species and methanol extract of air-dried R. canina hips showed some anti-inflammatory (cyclooxygenase-1 and 12-lipooxygense inhibition potency) activity. Purée of R. canina exerted cytotoxic activity only against the HeLa cell line among several others (HeLa, MCF7, HT-29 and MRC-5). The presented results support traditional use of rose hips and their fruit preserves as food with health and nutritional benefits. Copyright © 2015 Elsevier Ltd. All rights reserved.

  11. Business and Industry Project-Based Capstone Courses: Selecting Projects and Assessing Learning Outcomes

    Science.gov (United States)

    Maleki, Reza A.

    2009-01-01

    This is the first of two articles in which the author shares experiences gained from the development and delivery of a business/industry project-based capstone course. The course integrates research, proposal development and design experience based on knowledge and skills acquired in earlier coursework. The course also incorporates standards and…

  12. 78 FR 52963 - 60-Day Notice of Proposed Information Collection: Technical Processing Requirements for...

    Science.gov (United States)

    2013-08-27

    ... Information Collection: Technical Processing Requirements for Multifamily Project Mortgage Insurance AGENCY...: HUD is seeking approval from the Office of Management and Budget (OMB) for the information collection... interested parties on the proposed collection of information. The purpose of this notice is to allow for 60...

  13. 77 FR 16048 - Notice of Submission of Proposed Information Collection to OMB Public/Private Partnerships for...

    Science.gov (United States)

    2012-03-19

    ... Proposed Information Collection to OMB Public/Private Partnerships for the Mixed-Finance Development of... Mixed-Finance development of public housing units. This meant that Public Housing Authorities (PHAs) could create public housing projects using public housing grant or capital funds and non-HUD sources of...

  14. 24 CFR 58.37 - Environmental impact statement determinations.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Environmental impact statement... Classification § 58.37 Environmental impact statement determinations. (a) An EIS is required when the project is... and Urban Development ENVIRONMENTAL REVIEW PROCEDURES FOR ENTITIES ASSUMING HUD ENVIRONMENTAL...

  15. 24 CFR 402.2 - Definitions.

    Science.gov (United States)

    2010-04-01

    ...: affiliate, disabled family, elderly family, eligible project, HUD, MAHRA, owner, PAE, Restructuring Plan... in section 512 of MAHRA: expiration date, fair market rent, renewal, and tenant-based assistance. (c) Other defined terms. In this part, the term— Comparable market rents means rents determined in...

  16. Orthogonality Measurement for Homogenous Projects-Bases

    Science.gov (United States)

    Ivan, Ion; Sandu, Andrei; Popa, Marius

    2009-01-01

    The homogenous projects-base concept is defined. Next, the necessary steps to create a homogenous projects-base are presented. A metric system is built, which then will be used for analyzing projects. The indicators which are meaningful for analyzing a homogenous projects-base are selected. The given hypothesis is experimentally verified. The…

  17. 24 CFR 882.514 - Family participation.

    Science.gov (United States)

    2010-04-01

    ... Families selected to participate must be maintained so as to provide HUD with racial, gender, and ethnic... assistance of the PHA in resolving the issue. If the issue cannot be resolved promptly, the Family may file a...

  18. Modelling of migration and fate of selected persistent organic pollutants in the Gulf of Gdansk and the Vistula catchment (Poland): selected results from the EU ELOISE EuroCat project

    Science.gov (United States)

    Zukowska, Barbara; Pacyna, Jozef; Namiesnik, Jacek

    2005-02-01

    The ELOISE EU EuroCat project integrated natural and social sciences to link the impacts affecting the coastal sea to the human activities developed along the catchments. In EuroCat project river catchments' changes and their impact on the inflow area were analysed. The information was linked with environmental models. The part of the EU ELOISE EuroCat project focusing on the Vistula River catchment and the Baltic Sea costal zone was named VisCat. Within the framework of the EU ELOISE EuroCat - VisCat project, CoZMo-POP (Coastal Zone Model for Persistent Organic Pollutants), a non-steady-state multicompartmental mass balance model of long-term chemical fate in the coastal environment or the drainage basin of a large lake environment was used. The model is parameterised and tested herein to simulate the long-term fate and distribution of selected HCHs (hexachlorocyclohexanes) and PCBs (polychlorinated biphenyls) in the Gulf of Gdansk and the Vistula River drainage basin environment. The model can also be used in the future to predict future concentrations in relation to various emission scenarios and in management of economic development and regulations of substance-emission to this environment. However, this would require more extensive efforts in the future on model parameterisation and validation in order to increase the confidence in current model outputs.

  19. Conservation Science Fair Projects.

    Science.gov (United States)

    Soil Conservation Society of America, Ankeny, IA.

    Included are ideas, suggestions, and examples for selecting and designing conservation science projects. Over 70 possible conservation subject areas are presented with suggested projects. References are cited with each of these subject areas, and a separate list of annotated references is included. The references pertain to general subject…

  20. Technology trajectories and the selection of optimal R and D project sequences

    NARCIS (Netherlands)

    van Bommel, Ties; Mahieu, R.J.; Nijssen, E.J.

    2014-01-01

    Given a set of R&D projects drawing on the same underlying technology, a technology trajectory refers to the order in which projects are executed. Due to their technological interdependence, the successful execution of one project can increase a firm's technological capability, and help to

  1. Severe fuel damage projects

    International Nuclear Information System (INIS)

    Sdouz, G.

    1987-10-01

    After the descriptions of the generation of a Severe Fuel Damage Accident in a LWR the hypothetical course of such an accident is explained. Then the most significant projects are described. At each project the experimental facility, the most important results and the concluding models and codes are discussed. The selection of the projects is concentrated on the German Projekt Nukleare Sicherheit (PNS), tests performed at the Idaho National Engineering Laboratory (INEL) and smaller projects in France and Great Britain. 25 refs., 26 figs. (Author)

  2. Short communication: Genomic selection in a crossbred cattle population using data from the Dairy Genetics East Africa Project.

    Science.gov (United States)

    Brown, A; Ojango, J; Gibson, J; Coffey, M; Okeyo, M; Mrode, R

    2016-09-01

    Due to the absence of accurate pedigree information, it has not been possible to implement genetic evaluations for crossbred cattle in African small-holder systems. Genomic selection techniques that do not rely on pedigree information could, therefore, be a useful alternative. The objective of this study was to examine the feasibility of using genomic selection techniques in a crossbred cattle population using data from Kenya provided by the Dairy Genetics East Africa Project. Genomic estimated breeding values for milk yield were estimated using 2 prediction methods, GBLUP and BayesC, and accuracies were calculated as the correlation between yield deviations and genomic breeding values included in the estimation process, mimicking the situation for young bulls. The accuracy of evaluation ranged from 0.28 to 0.41, depending on the validation population and prediction method used. No significant differences were found in accuracy between the 2 prediction methods. The results suggest that there is potential for implementing genomic selection for young bulls in crossbred small-holder cattle populations, and targeted genotyping and phenotyping should be pursued to facilitate this. Copyright © 2016 American Dairy Science Association. Published by Elsevier Inc. All rights reserved.

  3. System design projects for undergraduate design education

    Science.gov (United States)

    Batill, S. M.; Pinkelman, J.

    1993-01-01

    Design education has received considerable in the recent past. This paper is intended to address one aspect of undergraduate design education and that is the selection and development of the design project for a capstone design course. Specific goals for a capstone design course are presented and their influence on the project selection are discussed. The evolution of a series of projects based upon the design of remotely piloted aircraft is presented along with students' perspective on the capstone experience.

  4. Critical Success Factors in Construction Projects (Governmental Projects as a Case Study)

    OpenAIRE

    Hatem Khaleefah Al-Ageeli; Abdul Salam J. Ali Alzobaee

    2016-01-01

    The importance of the construction sector and its Great role in the provision of services and infrastructure, reduce poverty, improve living conditions and improve the economic situation in the country, impose attention to the way in which the projects implemented for its improvement and to get successful projects. The objective of this research was to determine the criteria for success as well as critical success and failure factors that have a significant impact on project success. A select...

  5. 24 CFR 573.8 - Environmental procedures and standards.

    Science.gov (United States)

    2010-04-01

    ... Historic Preservation Officer) or any other source qualified to provide reliable information on the... data needed to make a determination of compliance. For successful Borrowers, the costs for preparing the environmental data are eligible as project costs. (1) If HUD determines that one or more of the...

  6. 77 FR 21795 - Notice of Submission of Proposed Information Collection to OMB Public Housing Agency Plan

    Science.gov (United States)

    2012-04-11

    ... proposals. It is expected that Qualified PHAs, as a matter of good business practice, continue to keep their... matter of good business practice, continue to keep their residents, the general public, and the local HUD..., Project- based vouchers, required or voluntary conversion, homeownership, or capital improvements, etc...

  7. 78 FR 44627 - HOME Investment Partnerships Program: Improving Performance and Accountability; Updating Property...

    Science.gov (United States)

    2013-07-24

    ... projects; Eliminating the requirement for a minimum 15-year useful life of major systems, and providing, in lieu of such requirement, that the participating jurisdiction must estimate the remaining useful life... that HUD permit independent contractors, in addition to paid staff, to work full time. Several...

  8. PPP projects in transport

    DEFF Research Database (Denmark)

    Petersen, Ole Helby; Carpintero, Samuel

    2014-01-01

    Public–private partnerships (PPPs) have been extensively used in Spain for the procurement of light rail systems. This paper analyses five projects that have been in operation for more than five years. The authors examine the reasoning behind the selection of the PPP projects, risk......-sharing mechanisms, competition among private providers, and overall cost-effectiveness. The paper demonstrates a need for more rigorous assessments of the merits of PPP projects before they are initiated....

  9. Research on Contractor Selection Based on Project Partnership%项目合作关系下承包商选择的研究

    Institute of Scientific and Technical Information of China (English)

    王舜; 马钦海; 冯卓

    2012-01-01

    针对建筑行业中业主与承包商通过合作可以实现双方共赢,但传统的承包商选择模型难以选择到合作关系下的承包商这一问题,利用因子分析法对影响建筑行业中项目合作成功的16个变量进行分析,提出了项目合作关系下承包商选择的基本框架,从一个全新的角度诠释了合作关系下的承包商选择的标准.指出业主企业在竞购阶段选取项目合作的承包商时应注重承包商的这四个方面:合作意愿、敏捷性能力、合作能力和竞购能力,为业主企业在竞购阶段正确选择项目合作承包商提供参考.%In view of the fact that with a more traditional contractor selection model it is rather difficult to pick out the right contractors based on project partnership,although both clients and contractors might benefit through cooperation in the construction industry,a factor analysis is employed to analyze the 16 variables affecting the successful project cooperation in the construction industry.It then puts forward a basic framework of contractor selection based on project partnership and interprets the criteria for contractor selection from a new perspective.Finally,the paper points out that clients should attach great importance to the following four aspects: willingness to cooperate,agility,ability to cooperate and capability of procurement,which could provide reference for them to select appropriate contractors at the procurement stage.

  10. Flood control project selection using an interval type-2 entropy weight with interval type-2 fuzzy TOPSIS

    Science.gov (United States)

    Zamri, Nurnadiah; Abdullah, Lazim

    2014-06-01

    Flood control project is a complex issue which takes economic, social, environment and technical attributes into account. Selection of the best flood control project requires the consideration of conflicting quantitative and qualitative evaluation criteria. When decision-makers' judgment are under uncertainty, it is relatively difficult for them to provide exact numerical values. The interval type-2 fuzzy set (IT2FS) is a strong tool which can deal with the uncertainty case of subjective, incomplete, and vague information. Besides, it helps to solve for some situations where the information about criteria weights for alternatives is completely unknown. Therefore, this paper is adopted the information interval type-2 entropy concept into the weighting process of interval type-2 fuzzy TOPSIS. This entropy weight is believed can effectively balance the influence of uncertainty factors in evaluating attribute. Then, a modified ranking value is proposed in line with the interval type-2 entropy weight. Quantitative and qualitative factors that normally linked with flood control project are considered for ranking. Data in form of interval type-2 linguistic variables were collected from three authorised personnel of three Malaysian Government agencies. Study is considered for the whole of Malaysia. From the analysis, it shows that diversion scheme yielded the highest closeness coefficient at 0.4807. A ranking can be drawn using the magnitude of closeness coefficient. It was indicated that the diversion scheme recorded the first rank among five causes.

  11. 24 CFR 908.104 - Requirements.

    Science.gov (United States)

    2010-04-01

    ... management associations and management agents with centralized facilities. HAs that contract out the electronic transmission function must retain the ability to monitor the day-to-day operations of the project at the HA site and be able to demonstrate the ability to the relevant HUD Field Office. (e...

  12. 24 CFR 200.225 - Approvals by Area Managers for limited partners.

    Science.gov (United States)

    2010-04-01

    ... previous projects covered by these regulations has been as a limited partner. All other certificates must... limited partners. 200.225 Section 200.225 Housing and Urban Development Regulations Relating to Housing... by Area Managers for limited partners. The Area Manager of the HUD Area Office where the certificate...

  13. 24 CFR 245.430 - Decision on request for approval.

    Science.gov (United States)

    2010-04-01

    ... (3) In the case of HUD's approval of a conversion of residential units in a multifamily housing... corporation or association, which residential rental units are to be converted and whether the conversion is... a conversion from project-paid utilities to tenant-paid utilities or a reduction in tenant utility...

  14. Genomic scans for selective sweeps using SNP data

    DEFF Research Database (Denmark)

    Nielsen, Rasmus; Williamson, Scott; Kim, Yuseob

    2005-01-01

    of the selection coefficient. To illustrate the method, we apply our approach to data from the Seattle SNP project and to Chromosome 2 data from the HapMap project. In Chromosome 2, the most extreme signal is found in the lactase gene, which previously has been shown to be undergoing positive selection. Evidence...

  15. INDICATIVE MODEL OF DEVIATIONS IN PROJECT

    Directory of Open Access Journals (Sweden)

    Олена Борисівна ДАНЧЕНКО

    2016-02-01

    Full Text Available The article shows the process of constructing the project deviations indicator model. It based on a conceptual model of project deviations integrated management (PDIM. During the project different causes (such as risks, changes, problems, crises, conflicts, stress lead to deviations of integrated project indicators - time, cost, quality, and content. For a more detailed definition of where in the project deviations occur and how they are dangerous for the whole project, it needs to develop an indicative model of project deviations. It allows identifying the most dangerous deviations that require PDIM. As a basis for evaluation of project's success has been taken famous model IPMA Delta. During the evaluation, IPMA Delta estimated project management competence of organization in three modules: I-Module ("Individuals" - a self-assessment personnel, P-module ("Projects" - self-assessment of projects and/or programs, and O-module ("Organization" - used to conduct interviews with selected people during auditing company. In the process of building an indicative model of deviations in the project, the first step is the assessment of project management in the organization by IPMA Delta. In the future, built cognitive map and matrix of system interconnections of the project, which conducted simulations and built a scale of deviations for the selected project. They determined a size and place of deviations. To identify the detailed causes of deviations in the project management has been proposed to use the extended system of indicators, which is based on indicators of project management model Project Excellence. The proposed indicative model of deviations in projects allows to estimate the size of variation and more accurately identify the place of negative deviations in the project and provides the project manager information for operational decision making for the management of deviations in the implementation of the project

  16. Selection of topologies for the PHOTONERGY{sup TM} project. Optimised design and control of inverter for photovoltaic systems: the AC-module

    Energy Technology Data Exchange (ETDEWEB)

    Baekhoej Kjaer, S.

    2002-06-01

    The PHOTONERGY{sup TM} project (also known as the former 'SolcelleInverter' project) is by this report carried into its third stage; the selection of a suitable topology for the AC-Module inverter. The selection of a suitable topology is based on State-Of-The-Art analysis a specifications and a comparison of four grid-tied inverters and nine dc/dc converters. This implies 23 possible combinations, from which nine is investigated with respect to efficiency in six working points, the number of components and to some extent also the rating of the components. The conclusion is that the target of a European efficiency of 93.7% is hard to achieve. But four of the examined, and two newly discovered, inverters are recommended for a further examination by means of estimations, calculations and simulations of: cost, complexity, robustness, efficiency and mass-production. The system-layout is also examined. The first layout implies that the PV-Module and the inverter is integrated into one unit and the second layout involves that the inverter is placed indoor. The layouts are compared with respect to cable-losses, enclosure demanding and lifetime. The conclusion is somehow ambiguous and a further investigation should be initiated in order to get a clear result. (au)

  17. Spent nuclear fuel project technical databook

    Energy Technology Data Exchange (ETDEWEB)

    Reilly, M.A.

    1998-07-22

    The Spent Nuclear Fuel (SNF) project technical databook provides project-approved summary tables of selected parameters and derived physical quantities, with nominal design and safety basis values. It contains the parameters necessary for a complete documentation basis of the SNF Project technical and safety baseline. The databook is presented in two volumes. Volume 1 presents K Basins SNF related information. Volume 2 (not yet available) will present selected sludge and water information, as it relates to the sludge and water removal projects. The values, within this databook, shall be used as the foundation for analyses, modeling, assumptions, or other input to SNF project safety analyses or design. All analysis and modeling using a parameter available in this databook are required to use and cite the appropriate associated value, and document any changes to those values (i.e., analysis assumptions, equipment conditions, etc). Characterization and analysis efforts are ongoing to validate, or update these values.

  18. Spent nuclear fuel project technical databook

    International Nuclear Information System (INIS)

    Reilly, M.A.

    1998-01-01

    The Spent Nuclear Fuel (SNF) project technical databook provides project-approved summary tables of selected parameters and derived physical quantities, with nominal design and safety basis values. It contains the parameters necessary for a complete documentation basis of the SNF Project technical and safety baseline. The databook is presented in two volumes. Volume 1 presents K Basins SNF related information. Volume 2 (not yet available) will present selected sludge and water information, as it relates to the sludge and water removal projects. The values, within this databook, shall be used as the foundation for analyses, modeling, assumptions, or other input to SNF project safety analyses or design. All analysis and modeling using a parameter available in this databook are required to use and cite the appropriate associated value, and document any changes to those values (i.e., analysis assumptions, equipment conditions, etc). Characterization and analysis efforts are ongoing to validate, or update these values

  19. Integrated multi-resource planning and scheduling in engineering project

    Directory of Open Access Journals (Sweden)

    Samer Ben Issa

    2017-01-01

    Full Text Available Planning and scheduling processes in project management are carried out sequentially in prac-tice, i.e. planning project activities first without visibility of resource limitation, and then schedul-ing the project according to these pre-planned activities. This is a need to integrate these two pro-cesses. In this paper, we use Branch and Bound approach for generating all the feasible and non-feasible project schedules with/without activity splitting, and with a new criterion called “the Minimum Moments of Resources Required around X-Y axes (MMORR”, we select the best feasible project schedule to integrate plan processing and schedule processing for engineering projects. The results illustrate that this integrated approach can effectively select the best feasible project schedule among alternatives, improves the resource utilization, and shortens the project lead time.

  20. Analysis of Criteria Influencing Contractor Selection Using TOPSIS Method

    Science.gov (United States)

    Alptekin, Orkun; Alptekin, Nesrin

    2017-10-01

    Selection of the most suitable contractor is an important process in public construction projects. This process is a major decision which may influence the progress and success of a construction project. Improper selection of contractors may lead to problems such as bad quality of work and delay in project duration. Especially in the construction projects of public buildings, the proper choice of contractor is beneficial to the public institution. Public procurement processes have different characteristics in respect to dissimilarities in political, social and economic features of every country. In Turkey, Turkish Public Procurement Law PPL 4734 is the main regulatory law for the procurement of the public buildings. According to the PPL 4734, public construction administrators have to contract with the lowest bidder who has the minimum requirements according to the criteria in prequalification process. Public administrators are not sufficient for selection of the proper contractor because of the restrictive provisions of the PPL 4734. The lowest bid method does not enable public construction administrators to select the most qualified contractor and they have realised the fact that the selection of a contractor based on lowest bid alone is inadequate and may lead to the failure of the project in terms of time delay Eand poor quality standards. In order to evaluate the overall efficiency of a project, it is necessary to identify selection criteria. This study aims to focus on identify importance of other criteria besides lowest bid criterion in contractor selection process of PPL 4734. In this study, a survey was conducted to staff of Department of Construction Works of Eskisehir Osmangazi University. According to TOPSIS (Technique for Order Preference by Similarity to the Ideal Solution) for analysis results, termination of construction work in previous tenders is the most important criterion of 12 determined criteria. The lowest bid criterion is ranked in rank 5.

  1. 75 FR 59284 - Notice of Submission of Proposed Information Collection to OMB; Financial Standards for Housing...

    Science.gov (United States)

    2010-09-27

    ... (PHAs) could purchase insurance coverage without regard to competitive selection procedures, if the insurance was purchased from a nonprofit insurance entity owned and controlled by PHAs approved HUD, in... staff have certain levels of experience. DATES: Comments Due Date: October 27, 2010. ADDRESSES...

  2. Landfill Gas Energy Project Data and Landfill Technical Data

    Science.gov (United States)

    This page provides data from the LMOP Database for U.S. landfills and LFG energy projects in Excel files, a map of project and candidate landfill counts by state, project profiles for a select group of projects, and information about Project Expo sites.

  3. 24 CFR 891.560 - HAP contract.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false HAP contract. 891.560 Section 891... Assistance § 891.560 HAP contract. (a) HAP contract. The housing assistance payments contract sets forth.... (b) HAP contract execution. (1) Upon satisfactory completion of the project, the Borrower and HUD...

  4. 75 FR 76481 - Notice of Intent To Prepare Environmental Impact Statement for the HOPE SF Development at Alice...

    Science.gov (United States)

    2010-12-08

    ... Environmental Impact Statement for the HOPE SF Development at Alice Griffith Public Housing Development, San... Housing as part of its HOPE SF development program. Funding for the project may include HUD funds from... revitalization program under HOPE SF (Cal 118). The proposed development would be located on approximately 20 net...

  5. Avaliação da atividade antimicrobiana e antioxidante das espécies Plectranthus amboinicus (Lour. e Mentha x villosa (Huds.

    Directory of Open Access Journals (Sweden)

    Rosangela Correia Freitas

    2014-01-01

    Full Text Available O uso de plantas medicinais com potencial terapêutico tem motivado a realização de estudos através de ensaios experimentais que visam fornecer informações úteis e de extrema importância. Assim o presente trabalho objetivou avaliar a atividade antimicrobiana e antioxidante das espécies de Coleus amboinicus (Lour. e Mentha x villosa (Huds. A atividade antimicrobiana foi avaliada pelo método de difusão em disco, cepas bacterianas padronizadas Gram negativas Escherichia coli (ATCC 25922 e ATCC 35218, cepas Gram positivas Staphylococcus aureus (ATCC 25923 e S. aureus ATCC 27853, assim como fungos padrões de Cryptococcus neoformans (pertencentes à coleção de microrganismos do CESMAC. Como controle positivo foi usado o imipenem e fluconazol e como controle negativo um disco com etanol absoluto. A determinação do potencial antioxidante foi realizada utilizando os métodos DPPH, FTC e determinação de compostos fenólicos. Os extratos etanólicos de C. amboinicus e M. x villosa apresentaram excelentes resultados tanto relacionado à atividade antimicrobiana quanto à antioxidante. Nossos resultados mostram a potencialidade das plantas analisadas na prevenção e no combate de doenças.

  6. Chapter 3: Design of the Saber-Tooth Project.

    Science.gov (United States)

    Ward, Phillip

    1999-01-01

    Used data from interviews, surveys, and document analysis to describe the methods and reform processes of the Saber Tooth Project, examining selection of sites; demographics (school sites, teachers, data sources, and project assumptions); and project phases (development, planning, implementation, and support). The project's method of reform was…

  7. Mathematical programming and financial objectives for scheduling projects

    CERN Document Server

    Kimms, Alf

    2001-01-01

    Mathematical Programming and Financial Objectives for Scheduling Projects focuses on decision problems where the performance is measured in terms of money. As the title suggests, special attention is paid to financial objectives and the relationship of financial objectives to project schedules and scheduling. In addition, how schedules relate to other decisions is treated in detail. The book demonstrates that scheduling must be combined with project selection and financing, and that scheduling helps to give an answer to the planning issue of the amount of resources required for a project. The author makes clear the relevance of scheduling to cutting budget costs. The book is divided into six parts. The first part gives a brief introduction to project management. Part two examines scheduling projects in order to maximize their net present value. Part three considers capital rationing. Many decisions on selecting or rejecting a project cannot be made in isolation and multiple projects must be taken fully into a...

  8. MATHEMATICAL APPARATUS FOR KNOWLEDGE BASE PROJECT MANAGEMENT OF OCCUPATIONAL SAFETY

    Directory of Open Access Journals (Sweden)

    Валентина Николаевна ПУРИЧ

    2015-05-01

    Full Text Available The occupational safety project (OSP management is aimed onto a rational choice implementation. With respect to the subjectivity of management goals the project selection is considered as a minimum formalization level information process, The proposed project selection model relies upon the enterprise’s occupational and industrial safety assessment using fuzzy logic and linguistic variables based on occupational safety knowledge base.

  9. The selective neurotoxin DSP-4 impairs the noradrenergic projections from the locus coeruleus to the inferior colliculus in rats.

    Directory of Open Access Journals (Sweden)

    Sebastián eHormigo

    2012-06-01

    Full Text Available The inferior colliculus (IC and the locus coeruleus (LC are two midbrain nuclei that integrate multimodal information and play a major role in novelty detection to elicit an orienting response. Despite the reciprocal connections between these two structures, the projection pattern and target areas of the LC within the subdivisions of the rat IC are still unknown. Here, we used tract-tracing approaches combined with immunohistochemistry, densitometry and confocal microscopy analysis to describe a projection from the LC to the IC. Biotinylated dextran amine (BDA injections into the LC showed that the LC-IC projection is mainly ipsilateral (90% and reaches, to a major extent, the dorsal and lateral part of the IC and the intercollicular commissure. Additionally, some LC fibers extend into the central nucleus of the IC. The neurochemical nature of this projection is noradrenergic, given that tyrosine hydroxylase (TH and dopamine beta hydroxylase (DBH colocalize with the BDA-labeled fibers from the LC. To determine the total field of the LC innervations in the IC, we destroyed the LC neurons and fibers using a highly selective neurotoxin, DSP-4, and then studied the distribution and density of TH- and DBH-immunolabeled axons in the IC. In the DSP-4 treated animals, the number of axonal fibers immunolabeled for TH and DBH were deeply decreased throughout the entire rostrocaudal extent of the IC and its subdivisions compared to controls. Our densitometry results showed that the IC receives up to 97% of its noradrenergic innervations from the LC neurons and only 3% from non-coeruleus neurons. Our results also indicate that TH immunoreactivity in the IC was less impaired than the immunoreactivity for DBH after DSP-4 administration. This is consistent with the existence of an important dopaminergic projection from the substantia nigra to the IC. In conclusion, our study demonstrates and quantifies the noradrenergic projection from the LC to the IC and its

  10. Decisive management in selecting locations for development of construction projects

    Science.gov (United States)

    Szafranko, E.; Pawłowicz, J. A.

    2017-08-01

    The location of an investment project is one of the most important decisions in the construction and land development business. The shape of a new building and aspects of its future use depend on making a good choice of a land plot where it will be constructed. There are many characteristics involved descriptions of land available for development. On the one hand, different buildings (with different envisaged use) fit differently to a given location. Residential homes, for example, require a location which will ensure a peaceful lifestyle, with places for walks and recreation, situated in a relatively quite setting. On the other hand, close proximity to schools, shops or a health clinic is another important consideration. Industrial buildings should be localized so as not to be a nuisance to others, and their location should facilitate efficient transport of raw materials and ready products. Yet other requirements are defined for public buildings. It is therefore evident that the characteristics included in an evaluation of the location of a planned building can be highly diverse and their diversity makes the evaluation difficult. Selection of a location can be supported by a variety of methods. For instance, an evaluation can rely on assigning points which indicate the fulfillment of certain criteria. This approach generates a complex evaluation in the form of tables and maps of usefulness. Another possibility is to make an assessment of the criteria that a given land parcels should satisfy in order to develop a specific type of a building. Having combined these two sets of information, we can create a system or a model for the management of land resources, which will easily help to support decision making processes pertaining to the choice of a location. This article shows a model approach for a specific building.

  11. Criteria for Developing a Successful Privatization Project

    Science.gov (United States)

    1989-05-01

    conceptualization and planning are required when pursuing privatization projects. In fact, privatization project proponents need to know how to...selection of projects for analysis, methods of acquiring information about these projects, and the analysis framwork . Chapter IV includes the analysis. A...performed an analysis to determine cormion conceptual and creative approaches and lessons learned. This analysis was then used to develop criteria for

  12. 76 FR 31884 - Reducing Regulatory Burden; Retrospective Review Plans Under E.O. 13563

    Science.gov (United States)

    2011-06-02

    ... agencies have been posted on the White House Web site at: http://www.slideshare.net/whitehouse/hud-combined... effective and less burdensome in achieving HUD's mission to create strong, sustainable, inclusive... House Web site at: http://www.slideshare.net/whitehouse/hud-combined . The appendix to HUD's plan...

  13. Flexibility and Project Value: Interactions and Multiple Real Options

    Science.gov (United States)

    Čulík, Miroslav

    2010-06-01

    This paper is focused on a project valuation with embedded portfolio of real options including their interactions. Valuation is based on the criterion of Net Present Value on the simulation basis. Portfolio includes selected types of European-type real options: option to expand, contract, abandon and temporarily shut down and restart a project. Due to the fact, that in reality most of the managerial flexibility takes the form of portfolio of real options, selected types of options are valued not only individually, but also in combination. The paper is structured as follows: first, diffusion models for forecasting of output prices and variable costs are derived. Second, project value is estimated on the assumption, that no real options are present. Next, project value is calculated with the presence of selected European-type options; these options and their impact on project value are valued first in isolation and consequently in different combinations. Moreover, intrinsic value evolution of given real options with respect to the time of exercising is analysed. In the end, results are presented graphically; selected statistics and risk measures (Value at Risk, Expected Shortfall) of the NPV's distributions are calculated and commented.

  14. Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

    Energy Technology Data Exchange (ETDEWEB)

    Burritt, James G.; Berkey, Edgar [Longenecker and Associates, Las Vegas, NV 89135 (United States)

    2012-07-01

    Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

  15. The ATLAS3D project - I. A volume-limited sample of 260 nearby early-type galaxies: science goals and selection criteria

    Science.gov (United States)

    Cappellari, Michele; Emsellem, Eric; Krajnović, Davor; McDermid, Richard M.; Scott, Nicholas; Verdoes Kleijn, G. A.; Young, Lisa M.; Alatalo, Katherine; Bacon, R.; Blitz, Leo; Bois, Maxime; Bournaud, Frédéric; Bureau, M.; Davies, Roger L.; Davis, Timothy A.; de Zeeuw, P. T.; Duc, Pierre-Alain; Khochfar, Sadegh; Kuntschner, Harald; Lablanche, Pierre-Yves; Morganti, Raffaella; Naab, Thorsten; Oosterloo, Tom; Sarzi, Marc; Serra, Paolo; Weijmans, Anne-Marie

    2011-05-01

    The ATLAS3D project is a multiwavelength survey combined with a theoretical modelling effort. The observations span from the radio to the millimetre and optical, and provide multicolour imaging, two-dimensional kinematics of the atomic (H I), molecular (CO) and ionized gas (Hβ, [O III] and [N I]), together with the kinematics and population of the stars (Hβ, Fe5015 and Mg b), for a carefully selected, volume-limited (1.16 × 105 Mpc3) sample of 260 early-type (elliptical E and lenticular S0) galaxies (ETGs). The models include semi-analytic, N-body binary mergers and cosmological simulations of galaxy formation. Here we present the science goals for the project and introduce the galaxy sample and the selection criteria. The sample consists of nearby (D 15°) morphologically selected ETGs extracted from a parent sample of 871 galaxies (8 per cent E, 22 per cent S0 and 70 per cent spirals) brighter than MK statistically representative of the nearby galaxy population. We present the size-luminosity relation for the spirals and ETGs and show that the ETGs in the ATLAS3D sample define a tight red sequence in a colour-magnitude diagram, with few objects in the transition from the blue cloud. We describe the strategy of the SAURON integral field observations and the extraction of the stellar kinematics with the pPXF method. We find typical 1σ errors of ΔV≈ 6 km s-1, Δσ≈ 7 km s-1, Δh3≈Δh4≈ 0.03 in the mean velocity, the velocity dispersion and Gauss-Hermite (GH) moments for galaxies with effective dispersion σe≳ 120 km s-1. For galaxies with lower σe (≈40 per cent of the sample) the GH moments are gradually penalized by pPXF towards zero to suppress the noise produced by the spectral undersampling and only V and σ can be measured. We give an overview of the characteristics of the other main data sets already available for our sample and of the ongoing modelling projects.

  16. Project of the Year Submittal SY-101 Surface Level Rise Remediation Project

    International Nuclear Information System (INIS)

    BAUER, R.E.

    2001-01-01

    CH2M HILL Hanford Group is pleased to nominate the SY-101 Surface Level Rise Remediation Project (SLRRP) for the Project Management Institute's consideration as International Project of the Year for 2001. We selected this project as being our best recent example of effective project management, having achieved and exceeded our client's expectations in resolving urgent safety issues related to the storage of high level nuclear waste. In reflection, we consider the SY-101 SLRRP to be a prime example of safe and effective project delivery. The pages that follow present the tools and techniques employed to manage this complex and technically challenging project. Our objective in submitting this nomination is twofold--to share the lessons we have learned with other organizations, and to honor the men and women who contributed to this endeavor. It was by their diligent effort that the successes we relate here were accomplished 10 months ahead of schedule and one million dollars below the authorized budget

  17. Opening the research agenda for selection of hot spots for human biomonitoring research in Belgium: a participatory research project

    Directory of Open Access Journals (Sweden)

    Chovanova Hana

    2010-07-01

    Full Text Available Abstract Background In order to select priority hotspots for environment and health research in Flanders (Belgium, an open procedure was organized. Environment and health hotspots are strong polluting point sources with possible health effects for residents living in the vicinity of the hot spot. The selection procedure was part of the work of the Flemish Centre of Expertise for Environment and Health, which investigates the relation between environmental pollution and human health. The project is funded and steered by the Flemish government. Methods The involvement of other actors than merely experts is inspired by the 'analytical-deliberative' approach of the National Research Council in the United States and the extended peer community approach. These approaches stress the importance of involving different expert- and social perspectives in order to increase the knowledge base on complex issues. In the procedure used in the project a combination of expert and stakeholder input was essential. The final decision was supported by a multi-criteria analysis of expert assessment and stakeholder advice. Results The endeavour was challenging from the start because of the complicated ambition of including a diversity of actors, potential hotspots, concerns and assessment criteria, but nevertheless the procedure proved its value in both structuring and informing the decision-making process. Moreover the process gained the support of most actors participating in the process, even though the final selection could not satisfy all preferences. Conclusions Opening the research agenda exemplifies the value of inter- and transdisciplinary cooperation as well as the need for a well-structured and negotiated procedure that combines relevant factors and actors with pragmatism. The value of such a process also needs to prove itself in practice after the procedure has been completed: the tension between an ambition of openness on the one hand and a more closed

  18. Implications of material selection on the design of packaging machinery.

    Science.gov (United States)

    Merritt, J P

    2009-01-01

    Material selection has significant implications on the design and cost of horizontal-form-fill-seal packaging machinery. To avoid excessive costs, machine redesigns and project delays, material selection must be reconciled early in the project and revisited throughout the construction of the machine.

  19. Improved Prioritization Criteria for Road Infrastructure Projects

    Directory of Open Access Journals (Sweden)

    Ionescu Heroiu Marcel

    2016-12-01

    Full Text Available This report’s main aim is to propose a methodology for assessing state-budget-funded projects based on a rigorous selection model, including clear and effective prioritization criteria. This report first argues that project prioritization and selection should be optimized against four dimensions: absorption, impact, legitimacy, and capacity. Second, it provides a diagnostic of the National Program for Local Development (PNDL, managed by the Ministry of Regional Development and Public Administration (MRDPA, as the most significant source of state-budget funding for local infrastructure projects. The PNDL’s current design and implementation leaves room for improvement, as reflected by the lack of strategic direction in allocating funds and the continued rise in the number of projects that get started without a feasible timeline for their completion. Further, this report makes recommendations for improvement of project evaluation and selection procedures for local infrastructure development projects, with a special focus on prioritization criteria and viable funding sources for each type of investment. The practical purpose is to enhance the efficiency and effectiveness of proposed investments, maximizing impact in the context of inherently limited available financial resources. A complementary focus is on opportunities for harmonizing and better coordinating investments across various sources of funding, in the context of nearly EUR 40 billion available to Romania from the EU for the 2014-2020 programming period.

  20. Construction Tender Subcontract Selection using Case-based Reasoning

    Directory of Open Access Journals (Sweden)

    Due Luu

    2012-11-01

    Full Text Available Obtaining competitive quotations from suitably qualified subcontractors at tender tim n significantly increase the chance of w1nmng a construction project. Amidst an increasingly growing trend to subcontracting in Australia, selecting appropriate subcontractors for a construction project can be a daunting task requiring the analysis of complex and dynamic criteria such as past performance, suitable experience, track record of competitive pricing, financial stability and so on. Subcontractor selection is plagued with uncertainty and vagueness and these conditions are difficul_t o represent in generalised sets of rules. DeciSIOns pertaining to the selection of subcontr:act?s tender time are usually based on the mtu1t1onand past experience of construction estimators. Case-based reasoning (CBR may be an appropriate method of addressing the chal_lenges of selecting subcontractors because CBR 1s able to harness the experiential knowledge of practitioners. This paper reviews the practicality and suitability of a CBR approach for subcontractor tender selection through the development of a prototype CBR procurement advisory system. In this system, subcontractor selection cases are represented by a set of attributes elicited from experienced construction estimators. The results indicate that CBR can enhance the appropriateness of the selection of subcontractors for construction projects.

  1. The readiness of teachers to integrate information and communication technology for learning in a selected school in the GautengOnline project.

    OpenAIRE

    2008-01-01

    This study is aimed at providing the reader with a detailed description of the readiness of teachers to integrate Information and Communication Technology (ICT) for learning in a selected school in the GautengOnline (GoL) Project, through qualitative research design that used various data collecting methods: Questionnaire, observations and interview. A large number of teachers showed some interest in using ICT learning but had difficulties on how to get started due to the lack of suitable ICT...

  2. CHEMVAL project

    International Nuclear Information System (INIS)

    Chandratillake, M.; Falck, W.E.; Read, D.

    1992-01-01

    This report summarises the development history of the CHEMVAL Thermodynamic Database, the criteria employed for data selection and the contents of Version 4.0, issued to participants on the completion of the project. It accompanies a listing of the database constructed using the dBase III + /IV database management package. (Author)

  3. Genetic mapping of DArT markers in the Festuca-Lolium complex and their use in freezing tolerance association analysis

    Czech Academy of Sciences Publication Activity Database

    Bartoš, Jan; Sandve, S. R.; Kolliker, R.; Kopecký, David; Christelová, Pavla; Stočes, Štěpán; Ostrem, L.; Larsen, A.; Kilian, A.; Rognli, O. A.; Doležel, Jaroslav

    2011-01-01

    Roč. 122, č. 6 (2011), s. 1133-1147 ISSN 0040-5752 R&D Projects: GA MZe QH71267; GA MŠk ED0007/01/01 Institutional research plan: CEZ:AV0Z50380511 Keywords : PRATENSIS HUDS * TEMPERATE CEREALS * MULTIFLORUM LAM Subject RIV: EB - Genetics ; Molecular Biology Impact factor: 3.297, year: 2011

  4. 77 FR 57104 - Notice of Submission of Proposed Information Collection to OMB; Loan Guarantees for Indian Housing

    Science.gov (United States)

    2012-09-17

    ... service areas. Mortgage lenders approved by HUD provide borrower and lender information to HUD for..., Fannie Mae Form 1005. Description of the Need for the Information and Its Proposed Use The information is... service areas. Mortgage lenders approved by HUD provide borrower and lender information to HUD for...

  5. Feature Selection Based on Mutual Correlation

    Czech Academy of Sciences Publication Activity Database

    Haindl, Michal; Somol, Petr; Ververidis, D.; Kotropoulos, C.

    2006-01-01

    Roč. 19, č. 4225 (2006), s. 569-577 ISSN 0302-9743. [Iberoamerican Congress on Pattern Recognition. CIARP 2006 /11./. Cancun, 14.11.2006-17.11.2006] R&D Projects: GA AV ČR 1ET400750407; GA MŠk 1M0572; GA AV ČR IAA2075302 EU Projects: European Commission(XE) 507752 - MUSCLE Institutional research plan: CEZ:AV0Z10750506 Keywords : feature selection Subject RIV: BD - Theory of Information Impact factor: 0.402, year: 2005 http://library.utia.cas.cz/separaty/historie/haindl-feature selection based on mutual correlation.pdf

  6. ADDRESSING THE DEFICIT: Updating the Budgetary Implications of Selected GAO Work

    Science.gov (United States)

    1996-06-01

    DGPS DI DLA DOD DOE DOT DUR EDWAA EM EPA FAIR FAA FAS FDIC FHWA FY GAO GSA HACCP HCFA HHS HMO HUD IDB IFAD INS IRS JCT...Marti, the broadcasts are constantly and effectively jammed , USIA’S research data shows that, mainly as a result of the jamming , the number of Cubans...hours (from 3:30 am to 8:00 am), but Cuban jamming also expanded. In an attempt to overcome jamming , TV Marti has plans to convert from VHF to UHF

  7. Focusing on Best Value from a Source Selection Perspective

    Directory of Open Access Journals (Sweden)

    Ekambaram Palaneewaran

    2012-11-01

    Full Text Available The emerging focus on "best value" in construction projects entails several crucial and complex decision-making tasks for appropriate selection of capable contractors and consultants. In many ways and thus could be correspondingly achieved at different levels. Although traditional "price based" selection approaches are still preferred on various grounds such as simplicity and/or public accountability, they may well result in some "false economy" or missed opportunities for producing a better value. Furthermore, the lower significance of price as compared to the higher risk transference in project delivery methods such as Design-Build and Build-Operate-Transfer type arrangements render the purely "price based" approaches even less useful. Therefore a structured value focused selection approach is considered as beneficial for meeting the client's goals and projct-specific needs. This paper presents discussions on some useful approaches to best value conceptualizations in "Source selection" perspectives, e.g. starting with the "right" selection of competent constructors in Design-Bid-Build type projects. Furthermore, a conceptualized basic framework for best value selection is also presented.

  8. Plutonium Immobilization Project - Can-In-Canister Hardware Development/Selection

    International Nuclear Information System (INIS)

    Hamilton, L.

    2001-01-01

    The Plutonium Immobilization Project (PIP) is a program funded by the U.S. Department of Energy to develop technology to disposition excess weapons grade plutonium. This program introduces the ''Can-in-Canister'' (CIC) technology that immobilizes the plutonium by encapsulating it in ceramic forms (or pucks) and ultimately surrounding it with high-level waste glass to provide a deterrent to recovery. Since there are significant radiation, contamination and security concerns, the project team is developing unique technologies to remotely perform plutonium immobilization tasks. This paper covers the design, development and testing of the magazines (cylinders containing cans of ceramic pucks) and the rack that holds them in place inside the waste glass canister. Several magazine and rack concepts were evaluated to produce a design that gives the optimal balance between resistance to thermal degradation and facilitation of remote handling. This paper also reviews the effort to develop a jointed arm robot that can remotely load seven magazines into defined locations inside a stationary canister working only through the 4 inch (102 mm) diameter canister throat

  9. Plutonium Immobilization Project - Can-In-Canister Hardware Development/Selection

    International Nuclear Information System (INIS)

    Hamilton, L.

    2001-01-01

    The Plutonium Immobilization Project (PIP) is a program funded by the U.S. Department of Energy to develop technology to disposition excess weapons grade plutonium. This program introduces the ''Can-in-Canister'' (CIC) technology that immobilizes the plutonium by encapsulating it in ceramic forms (or pucks) and ultimately surrounding it with high-level waste glass to provide a deterrent to recovery. Since there are significant radiation, contamination and security concerns, the project team is developing unique technologies to remotely perform plutonium immobilization tasks. This paper covers the design, development and testing of the magazines (cylinders containing cans of ceramic pucks) and the rack that holds them in place inside the waste glass canister. Several magazine and rack concepts were evaluated to produce a design that gives the optimal balance between resistance to thermal degradation and facilitation of remote handling. This paper also reviews the effort to develop a join ted arm robot that can remotely load seven magazines into defined locations inside a stationary canister working only through the 4 inch (102 mm) diameter canister throat

  10. Effects of resource management regimes on project schedule

    NARCIS (Netherlands)

    Al-Jibouri, Saad H.S.

    2002-01-01

    This paper deals with the problem of resource scheduling within given resource constraints on a sectionalised construction project. A computer model has been developed which realistically simulates the progress of projects. A project has been selected and divided into sections whereby section

  11. 75 FR 4410 - Notice of Availability: Notice of Funding Availability (NOFA) for Fiscal Year 2009 Neighborhood...

    Science.gov (United States)

    2010-01-27

    ...On May 4, 2009, HUD posted its NSP2 NOFA at http:// www.hud.gov/nsp and announced the availability of the NOFA on May 7, 2009 (74 FR 21377). The NSP2 NOFA announced the availability of approximately $1.93 billion available in competitive grants authorized under the American Recovery and Reinvestment Act of 2009 (Pub. L. 111- 5, approved February 17, 2009). HUD corrected the NSP2 NOFA by Notices posted on the HUD Web site on June 11, 2009 and November 9, 2009, and announced by Federal Register publications published on June 17, 2009 (74 FR 28715) and November 16, 2009 (74 FR 58973), respectively. Today's Federal Register publication announces that HUD has posted a notice making further corrections to the NSP2 NOFA. Specifically, the Notice corrects the NSP2 NOFA to permit HUD to specify the deadline date for submission of consortium funding agreements in the transmittal letter for the NSP2 grant agreement, which allows the submission deadline to occur after obligation of grant funds. This notice only affects applications for funding that have already been submitted to HUD by consortium applicants. HUD notes that the deadline for applications was July 17, 2009, and, as a result, will not accept new applications for funding. The notice correcting the NSP2 NOFA is available on the HUD Web site at http://www.hud.gov/recovery.

  12. Interviews with Selectively Mute Children

    Science.gov (United States)

    Omdal, Heidi; Galloway, David

    2007-01-01

    The assessment of selective mutism usually takes place in a clinic, where the child often refuses to speak to the therapist. The challenge when trying to understand the child's own perspective is to find a medium for communication. Three selectively mute children were interviewed using Raven's Controlled Projection for Children (RCPC). The…

  13. 12 strategies for managing capital projects.

    Science.gov (United States)

    Stoudt, Richard L

    2013-05-01

    To reduce the amount of time and cost associated with capital projects, healthcare leaders should: Begin the project with a clear objective and a concise master facilities plan. Select qualified team members who share the vision of the owner. Base the size of the project on a conservative business plan. Minimize incremental program requirements. Evaluate the cost impact of the building footprint. Consider alternative delivery methods.

  14. Projections of Three-Dimensional Regions

    Science.gov (United States)

    Martinez, Felix; Rosa, De La

    2005-01-01

    When first-year calculus students are interested in studying double integrals, they can find, in standard textbooks, a detailed description of the different regions of integration. The aims of this paper are: to give a criterion to select the plane that will be projected, to classify the projections, and to give a simple rule to obtain them.…

  15. Project Execution Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)

    International Nuclear Information System (INIS)

    VAN BEEK, J.E.

    2000-01-01

    This Project Execution Plan documents the methodology for managing Project W-211. Project W-211, Initial Tank Retrieval Systems (ITRS), is a fiscal year 1994 Major Systems Acquisition that will provide systems for retrieval of radioactive wastes from selected double-shell tanks (DST). The contents of these tanks are a combination of supernatant liquids and settled solids. To retrieve waste from the tanks, it is first necessary to mix the liquid and solids prior to transferring the slurry to alternative storage or treatment facilities. The ITRS will provide systems to mobilize the settled solids and transfer the wastes out of the tanks. In so doing, ITRS provides feed for the future waste treatment plant, allows for consolidation of tank solids to manage space within existing DST storage capacity, and supports continued safe storage of tank waste. The ITRS scope has been revised to include waste retrieval systems for tanks AP-102, AP-104, AN-102, AN-103, AN-104, AN-105, AY-102, AZ-102, and SY-102. This current tank selection and sequence provides retrieval systems supporting the River Protection Project (RF'P) Waste Treatment Facility and sustains the ability to provide final remediation of several watch list DSTs via treatment. The ITRS is configured to support changing program needs, as constrained by available budget, by maintaining the flexibility for exchanging tanks requiring mixer pump-based retrieval systems and shifting the retrieval sequence. Preliminary design was configured such that an adequate basis exists for initiating Title II design of a mixer pump-based retrieval system for any DST. This Project Execution Plan (PEP), derived from the predecessor Project Management Plan, documents the methodology for managing the ITRS, formalizes organizational responsibilities and interfaces, and identifies project requirements such as change control, design verification, systems engineering, and human factors engineering

  16. COST AND TIME ESTIMATES DURING THE SUPPLIER SELECTION OF AN INFORMATION SYSTEM FOR LEGAL AREA: A CASE STUDY COMPARING TRADITIONAL AND AGILE PROJECT APPROACHES

    Directory of Open Access Journals (Sweden)

    Vieira, G. L. S.

    2017-06-01

    Full Text Available Considering a direct correlation between projects requirements details levels and their performance, this paper aims to evaluate whether the adoption of more extensive and detailed cost, time and scope estimation processes based on both practices, traditional and agile, and executed concurrently with the supplier selection stage, could guarantee greater accuracy in these estimates, thus increasing project success rates. Based on a case study for the information system project implementation into the legal area of a large Brazilian company, five suppliers had their proposals analyzed and compared in terms of the costs and deadlines involved, as well as the project management processes used in theirs estimates. From the obtained results, it was possible to observe that not all companies follow, at least during the prospecting phase, their service proposals described management processes, according to the theory. Another important finding was that the proposals involving, at least partially, agile approach concepts, were more likely to justify their estimates. These proposals still presented lower values, whenever compared to those less adherents to the theoretical concepts, as those based on traditional concepts.

  17. Analytical Support for Selecting the Best Investment Project in the Presence of Fuzzy Data

    Directory of Open Access Journals (Sweden)

    Kotsyuba Oleksiy S.

    2017-12-01

    Full Text Available The article is dedicated to the problem of optimal choice in the field of real investments in case of fuzzy estimates of financial and economic parameters. The general methodological basis of the research is an integrated approach to solving decision-making problems under conditions of uncertainty, conflict, and risk generated by them, based on the game theory, proposed by R. I. Trukhayev. In recent decades, it has been actively developed in papers by the followers of the scientific school of riskology under the leadership of V. V. Vitlinsky. One of the system-forming components of the above integration and game methodology is the classifier of information situations (there singled out seven of them. In this case, the description of possible states of the economic environment by a fuzzy set (a subset corresponds to the seventh information situation. An attempt was made to develop a methodical apparatus for the task of selecting the best investment project from a variety of alternative projects in the presence of fuzzy data. As a result, a model based on the use of convolutions of local criteria is formulated. In accordance with the accepted methodological guidelines, the structure of the generalized (integral indicator of the economic attractiveness (efficiency of real investment provides for three hierarchical levels: 1 the level of detailed criteria in terms of partial criteria (financial effect, profitability, payback period, 2 the level of partial criteria, 3 the level presenting the very generalized indicator. In the basic version of the proposed model, among the possible techniques (methods for aggregating indicators detailing the aspects of fuzzy estimates of partial criteria, the preference is given to the method by which they are joined by a combined, additive and multiplicative convolution.

  18. 24 CFR 965.205 - Qualified PHA-owned insurance entity.

    Science.gov (United States)

    2010-04-01

    ... a PHA could purchase insurance coverage without regard to competitive selection procedures when it purchases it from a nonprofit insurance entity owned and controlled by PHAs approved by HUD in accordance... of experience in large risk (exceeding $100,000 in annual premiums) commercial underwriting or at...

  19. 24 CFR 84.24 - Program income.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Program income. 84.24 Section 84.24... income. (a) HUD shall apply the standards set forth in this section in requiring recipient organizations to account for program income related to projects financed in whole or in part with Federal funds. (b...

  20. 77 FR 26304 - Federal Housing Administration (FHA) Healthcare Facility Documents: Proposed Revisions and...

    Science.gov (United States)

    2012-05-03

    ... provide Uniform Commercial Code (UCC) collateral through security agreements; borrowers provide their...--Contrac tors. HUD-90019-OHP Auditor Certification 3 1 3 0.58 2 67 117 223d. HUD-90021-OHP Certification.... HUD-92434-OHP Lender Certification... 35 10 350 0.75 263 75 19,688 HUD-91130-OHP Building Code 26 2 52...

  1. Do increases in subsidized housing reduce the incidence of homelessness? Vidence from the low-income housing tax credit

    OpenAIRE

    Jackson, Osborne; Kawano, Laura

    2015-01-01

    We examine the impact of subsidized housing on homelessness using the Low-Income Housing Tax Credit (LIHTC), the largest place-based housing program in the United States. To generate quasi-experimental variation in housing placements, we exploit a discontinuous increase in the amount of tax credits available to projects placed in certain high-poverty neighborhoods. Using data from the U.S. Census and HUD, we find that LIHTC project installation has no significant impact on neighborhood homele...

  2. Implementing learnerships: learner recruitment and selection B ...

    African Journals Online (AJOL)

    Implementing learnerships: learner recruitment and selection B lessons learnt from the KwaZulu-Natal pilot projects. ... 2001 in KwaZulu-Natal, with specific reference to the recruitment and selection of learners. ... AJOL African Journals Online.

  3. Analyzing the effect of selected control policy measures and sociodemographic factors on alcoholic beverage consumption in Europe within the AMPHORA project: statistical methods.

    Science.gov (United States)

    Baccini, Michela; Carreras, Giulia

    2014-10-01

    This paper describes the methods used to investigate variations in total alcoholic beverage consumption as related to selected control intervention policies and other socioeconomic factors (unplanned factors) within 12 European countries involved in the AMPHORA project. The analysis presented several critical points: presence of missing values, strong correlation among the unplanned factors, long-term waves or trends in both the time series of alcohol consumption and the time series of the main explanatory variables. These difficulties were addressed by implementing a multiple imputation procedure for filling in missing values, then specifying for each country a multiple regression model which accounted for time trend, policy measures and a limited set of unplanned factors, selected in advance on the basis of sociological and statistical considerations are addressed. This approach allowed estimating the "net" effect of the selected control policies on alcohol consumption, but not the association between each unplanned factor and the outcome.

  4. Project W-420 stack monitoring system upgrades

    International Nuclear Information System (INIS)

    CARPENTER, K.E.

    1999-01-01

    This project will execute the design, procurement, construction, startup, and turnover activities for upgrades to the stack monitoring system on selected Tank Waste Remediation System (TWRS) ventilation systems. In this plan, the technical, schedule, and cost baselines are identified, and the roles and responsibilities of project participants are defined for managing the Stack Monitoring System Upgrades, Project W-420

  5. A Population of Indirect Pathway Striatal Projection Neurons Is Selectively Entrained to Parkinsonian Beta Oscillations.

    Science.gov (United States)

    Sharott, Andrew; Vinciati, Federica; Nakamura, Kouichi C; Magill, Peter J

    2017-10-11

    Classical schemes of basal ganglia organization posit that parkinsonian movement difficulties presenting after striatal dopamine depletion stem from the disproportionate firing rates of spiny projection neurons (SPNs) therein. There remains, however, a pressing need to elucidate striatal SPN firing in the context of the synchronized network oscillations that are abnormally exaggerated in cortical-basal ganglia circuits in parkinsonism. To address this, we recorded unit activities in the dorsal striatum of dopamine-intact and dopamine-depleted rats during two brain states, respectively defined by cortical slow-wave activity (SWA) and activation. Dopamine depletion escalated striatal net output but had contrasting effects on "direct pathway" SPNs (dSPNs) and "indirect pathway" SPNs (iSPNs); their firing rates became imbalanced, and they disparately engaged in network oscillations. Disturbed striatal activity dynamics relating to the slow (∼1 Hz) oscillations prevalent during SWA partly generalized to the exaggerated beta-frequency (15-30 Hz) oscillations arising during cortical activation. In both cases, SPNs exhibited higher incidences of phase-locked firing to ongoing cortical oscillations, and SPN ensembles showed higher levels of rhythmic correlated firing, after dopamine depletion. Importantly, in dopamine-depleted striatum, a widespread population of iSPNs, which often displayed excessive firing rates and aberrant phase-locked firing to cortical beta oscillations, preferentially and excessively synchronized their firing at beta frequencies. Conversely, dSPNs were neither hyperactive nor synchronized to a large extent during cortical activation. These data collectively demonstrate a cell type-selective entrainment of SPN firing to parkinsonian beta oscillations. We conclude that a population of overactive, excessively synchronized iSPNs could orchestrate these pathological rhythms in basal ganglia circuits. SIGNIFICANCE STATEMENT Chronic depletion of dopamine

  6. Structuring and financing new nuclear power plant projects in Europe: selected remarks

    International Nuclear Information System (INIS)

    Belchev, A.

    2004-01-01

    Project financing in the field of nuclear energy is discussed taking into account the changes and new challenges in Europe. Bringing a project to maturity under 'revised' assumptions is likely to be a complex task for all parties involved, but there is a real potential for an enhanced role for stake holders from the private sector. There is a more realistic understanding about how the public and the private sectors can work together. Successfully combining public and private, national and foreign stake holders is likely to be a critical factor of success. The alignment of interest over the long term best serves a projects business case. In that context, a Governments policies are increasingly under the spotlight

  7. Adult EFL Reading Selection: Influence on Literacy

    Directory of Open Access Journals (Sweden)

    Juan Sebastián Basallo Gómez

    2016-01-01

    Full Text Available This paper is about the impact of systematic reading selection used to promote English as foreign language learning in adult students. A qualitative action research methodology was used to carry out this project. Ten class sessions were designed to provide students an opportunity to select texts according to criteria based upon their language levels and personal/professional interests. The findings align with three categories of influence: motivation, engagement, and contextualization/interpretation of readings. The main objective of this project was to see how the students’ text selection processes, guided by systematically designed criteria and elaborated strategies, influenced learning and acquisition in terms of motivation, perceptions, and opinions towards reading in English.

  8. Agile & Distributed Project Management

    DEFF Research Database (Denmark)

    Pries-Heje, Jan; Pries-Heje, Lene

    2011-01-01

    Scrum has gained surprising momentum as an agile IS project management approach. An obvious question is why Scrum is so useful? To answer that question we carried out a longitudinal study of a distributed project using Scrum. We analyzed the data using coding and categorisation and three carefully...... selected theoretical frameworks. Our conclusion in this paper is that Scrum is so useful because it provides effective communication in the form of boundary objects and boundary spanners, it provides effective social integration by building up social team capital, and it provides much needed control...... and coordination mechanisms by allowing both local and global articulation of work in the project. That is why Scrum is especially useful for distributed IS project management and teamwork....

  9. Genomic constitution of Festuca x Lolium hybrids revealed by the DArTFest array

    Czech Academy of Sciences Publication Activity Database

    Kopecký, David; Bartoš, Jan; Christelová, Pavla; Černoch, V.; Kilian, A.; Doležel, Jaroslav

    2011-01-01

    Roč. 122, č. 2 (2011), s. 355-363 ISSN 0040-5752 R&D Projects: GA MZe QH71267; GA ČR GP521/07/P479 Institutional research plan: CEZ:AV0Z50380511 Keywords : IN-SITU HYBRIDIZATION * GENETIC-LINKAGE MAP * PRATENSIS HUDS Subject RIV: EB - Genetics ; Molecular Biology Impact factor: 3.297, year: 2011

  10. 24 CFR 891.545 - Completion of project, cost certification, and HUD approvals.

    Science.gov (United States)

    2010-04-01

    ... Public Accountant or independent public accountant acceptable to the field office. (3) In the case of.... The simplified cost certification shall be verified by an independent Certified Public Accountant or an independent public accountant in a manner acceptable to the Secretary. (d) If the Borrower's...

  11. The HGF strategy project

    International Nuclear Information System (INIS)

    Knebel, J.U.; Fellmoser, F.; Lefhalm, C.; Mack, K.; Pettan, C.; Piecha, H.; Konys, J.; Adelhelm, C.; Glasbrenner, H.; Muscher, H.; Novotny, J.; Voss, Z.; Wedemeyer, O.; Mueller, G.; Heinzel, A.; Schumacher, G.; Huber, R.; Zimmermann, F.; Groetzbach, G.; Dorr, B.; Carteciano, L.N.

    2000-01-01

    Within the Hermann von Helmholtz-Gemeinschaft Deutscher Forschungszentren (HGF) an HGF-Strategy Fund Project entitled 'Innovative Technologies to Reduce Radiotoxicity' is funded since October 1999. The objectives of this HGF-Strategy Fund Project is the development of new methods and technologies to design and manufacture thin-walled and highly thermally-loaded surfaces which are cooled by a corrosive heavy liquid metal (lead-bismuth eutectic). The result of this project will be the basic scientific-technical tool which allows the conception and the design of a European Demonstrator of an ADS system (cf. 32.23.05). The work performed at Forschungszentrum Karlsruhe is embedded in a broad European research and development programme on ADS systems. The project is divided in three sub-projects: Sub-Project 1: Thermalhydraulic Investigations, Sub-Project 2: Material Specific Investigations, Sub-Project 3: Oxygen Control System. This progress report gives a general description of the project and its envisaged objectives. As a selection of the results achieved, first, FLUTAN calculations for the COULI beam window design and, second, the oxygen control system for the KArlsruhe Lead LAboratory KALLA are described in detail. Finally, the design and status of KALLA is given. (orig.)

  12. Mathematics for secondary education project (Matem-UNA: perception of students about of the courses received and the profesional careers they selected for higher education

    Directory of Open Access Journals (Sweden)

    Ana Lucía Alfaro Arce

    2013-03-01

    Full Text Available This paper summarizes the opinions of students who have enrolled in the Precalculus course offered by the MATEM project. The aim is to systematize the views expressed by the students enrolled in MATEM, which are related to general aspects of the project, and also to know the professional areas these students select when entering to the university. The information for this study was collected through two questionnaires administered to the participating students during 2005-2009. The most relevant results are the following: the students listed benefits from MATEM such as the opportunity to practice for their Mathematics test (Ministry of Education exam, obtaining new knowledge and developing mathematical and reasoning skills. Most students would recommend others to participate in the project. Regarding the careers that students pursue, it was found a preference for higher studies in public universities at Costa Rica; these majors include mathematics courses in their curriculum (Engineering, Economics, Statistics, Medicine, among others.

  13. 75 FR 68812 - Notice of Submission of Proposed Information Collection to OMB; Restrictions on Assistance to...

    Science.gov (United States)

    2010-11-09

    ... forms of information technology, e.g., permitting electronic submission of responses. This Notice Also..., HUD 9886-Russian, HUD 9886-Hmong, HUD 9886-French. Description of the Need for the Information and its...

  14. Financing of Chamera project

    International Nuclear Information System (INIS)

    Jain, A.K.; Chakraborty, D.K.

    1994-01-01

    Chamera Hydroelectric Project was selected by National Hydroelectric Power Corporation (NHPC) as a pilot project for accelerated development of hydro-power in the country. This project was considered to have certain distinct specialties from different aspects in comparison with other projects. In the first place, the field investigation for the project was completed in a record time of only eight months by deploying the most modern techniques. Secondly, Chamera was the first NHPC project with external aid both technically and financially. The third and most important of all the specialties was in the planned reduction of construction period to 6 years from the original estimate of 8 years. Such reduction of gestation period was considered to be the direct outcome of modern method of management, monitoring and improved imported technology. The investment decision in the project was taken in April '84 with an estimated cost of energy at busbar 44.12 paise/unit exclusive of return on equity capital and royalty payable to the home state. The all inclusive rate of power was estimated 75.86 paise/unit. (author). 4 tabs

  15. A critical evaluation of the STRATEGY project

    DEFF Research Database (Denmark)

    Howard, B.J.; Liland, A.; Beresford, N.A.

    2004-01-01

    The STRATEGY project (sustainable restoration and long-term management of contaminated rural, urban and industrial ecosystems; www.strategy-ec.org.uk) addressed the need for a holistic decision framework for the selection of optimal remediation strategies for long-term sustainable management...... of contaminated areas in Western Europe. The project considered both technical and social aspects of implementing restoration strategies for urban and rural environments. The importance of considering socially relevant objectives in addition to the dose reduction was emphasised. A critical evaluation was carried...... out on 101 selected countermeasures, (including rural waste disposal options), a model was developed to aid optimising countermeasure strategies and a method of carrying out participatory decision-making suggested. The outputs of the project are described and critically evaluated....

  16. A critical evaluation of the strategy project

    International Nuclear Information System (INIS)

    Howard, B. J.; Liland, A.; Beresford, N. A.; Andersson, K. G.; Cox, G.; Gil, J. M.; Hunt, J.; Nisbet, A.; Oughton, D. H.; Voigt, G.

    2004-01-01

    The STRATEGY project (sustainable restoration and long-term management of contaminated rural, urban and industrial ecosystems; www.strategy-ec.org.uk) addressed the need for a holistic decision framework for the selection of optimal remediation strategies for long-term sustainable management of contaminated areas in Western Europe. The project considered both technical and social aspects of implementing restoration strategies for urban and rural environments. The importance of considering socially relevant objectives in addition to the dose reduction was emphasised. A critical evaluation was carried out on 101 selected countermeasures, (including rural waste disposal options), a model was developed to aid optimising countermeasure strategies and a method of carrying out participatory decision-making suggested. The outputs of the project are described and critically evaluated. (authors)

  17. Managing Complex Distance Education Projects in a Telework Environment

    Science.gov (United States)

    Ally, Mohamed; Cleveland-Innes, Marti; Wiseman, Colin

    2010-01-01

    The advances of communication technologies have allowed professionals to work on distance education projects in a telework environment. Managers of these projects must have the skills to manage the projects from a distance. They must be able to select the appropriate team members to work on the project, orient team members, and monitor team…

  18. The ARCHER Project

    International Nuclear Information System (INIS)

    Knol, S.; Roelofs, F.; Fütterer, M.A.; Kohtz, N.; Laurie, M.; Buckthorpe, D.; Scheuermann, W.

    2014-01-01

    The European HTR R&D project ARCHER (Advanced High-Temperature Reactors for Cogeneration of Heat and Electricity R&D) builds on a solid HTR technology foundation in Europe, established through former national UK and German HTR programs and in European programs. ARCHER runs from 2011 to 2015 and targets selected HTR R&D subjects that would specifically support demonstration, with a focus on experimental effort. In line with the R&D and deployment strategy of the European Sustainable Nuclear Energy Technology Platform (SNETP) ARCHER contributes to maintaining, strengthening and expanding the HTR knowledge base in Europe to lay the foundations for demonstration of nuclear cogeneration with HTR systems. The project consortium encompasses conventional and nuclear industry, utilities, Technical Support Organizations, R&D organizations and academia. ARCHER shares results with international partners in the Generation IV International Forum and collaborates directly with related projects in the US, China, Japan, the Republic of Korea and South Africa. The ARCHER project is in its final year, and the paper comprises an overview of the achievements thus far for the different Sub Projects. (author)

  19. Beamspace dual signal space projection (bDSSP): a method for selective detection of deep sources in MEG measurements

    Science.gov (United States)

    Sekihara, Kensuke; Adachi, Yoshiaki; Kubota, Hiroshi K.; Cai, Chang; Nagarajan, Srikantan S.

    2018-06-01

    Objective. Magnetoencephalography (MEG) has a well-recognized weakness at detecting deeper brain activities. This paper proposes a novel algorithm for selective detection of deep sources by suppressing interference signals from superficial sources in MEG measurements. Approach. The proposed algorithm combines the beamspace preprocessing method with the dual signal space projection (DSSP) interference suppression method. A prerequisite of the proposed algorithm is prior knowledge of the location of the deep sources. The proposed algorithm first derives the basis vectors that span a local region just covering the locations of the deep sources. It then estimates the time-domain signal subspace of the superficial sources by using the projector composed of these basis vectors. Signals from the deep sources are extracted by projecting the row space of the data matrix onto the direction orthogonal to the signal subspace of the superficial sources. Main results. Compared with the previously proposed beamspace signal space separation (SSS) method, the proposed algorithm is capable of suppressing much stronger interference from superficial sources. This capability is demonstrated in our computer simulation as well as experiments using phantom data. Significance. The proposed bDSSP algorithm can be a powerful tool in studies of physiological functions of midbrain and deep brain structures.

  20. Forecast Inaccuracies in Power Plant Projects From Project Managers' Perspectives

    Science.gov (United States)

    Sanabria, Orlando

    Guided by organizational theory, this phenomenological study explored the factors affecting forecast preparation and inaccuracies during the construction of fossil fuel-fired power plants in the United States. Forecast inaccuracies can create financial stress and uncertain profits during the project construction phase. A combination of purposeful and snowball sampling supported the selection of participants. Twenty project managers with over 15 years of experience in power generation and project experience across the United States were interviewed within a 2-month period. From the inductive codification and descriptive analysis, 5 themes emerged: (a) project monitoring, (b) cost control, (c) management review frequency, (d) factors to achieve a precise forecast, and (e) factors causing forecast inaccuracies. The findings of the study showed the factors necessary to achieve a precise forecast includes a detailed project schedule, accurate labor cost estimates, monthly project reviews and risk assessment, and proper utilization of accounting systems to monitor costs. The primary factors reported as causing forecast inaccuracies were cost overruns by subcontractors, scope gaps, labor cost and availability of labor, and equipment and material cost. Results of this study could improve planning accuracy and the effective use of resources during construction of power plants. The study results could contribute to social change by providing a framework to project managers to lessen forecast inaccuracies, and promote construction of power plants that will generate employment opportunities and economic development.

  1. How to Grow Project Scientists: A Systematic Approach to Developing Project Scientists

    Science.gov (United States)

    Kea, Howard

    2011-01-01

    The Project Manager is one of the key individuals that can determine the success or failure of a project. NASA is fully committed to the training and development of Project Managers across the agency to ensure that highly capable individuals are equipped with the competencies and experience to successfully lead a project. An equally critical position is that of the Project Scientist. The Project Scientist provides the scientific leadership necessary for the scientific success of a project by insuring that the mission meets or exceeds the scientific requirements. Traditionally, NASA Goddard project scientists were appointed and approved by the Center Science Director based on their knowledge, experience, and other qualifications. However the process to obtain the necessary knowledge, skills and abilities was not documented or done in a systematic way. NASA Goddard's current Science Director, Nicholas White saw the need to create a pipeline for developing new projects scientists, and appointed a team to develop a process for training potential project scientists. The team members were Dr. Harley Thronson, Chair, Dr. Howard Kea, Mr. Mark Goldman, DACUM facilitator and the late Dr. Michael VanSteenberg. The DACUM process, an occupational analysis and evaluation system, was used to produce a picture of the project scientist's duties, tasks, knowledge, and skills. The output resulted in a 3-Day introductory course detailing all the required knowledge, skills and abilities a scientist must develop over time to be qualified for selections as a Project Scientist.

  2. Antarctic krill; assessment of mesh size selectivity and escape mortality from trawls

    DEFF Research Database (Denmark)

    Krafft, Bjørn A.; Krag, Ludvig Ahm; Herrmann, Bent

    2015-01-01

    Marine AS. The project will examine krill escape mortality from the codend during a full scale field experiment, model size selectivity and escape mortality in codends including different designs and assess the size selectivity in the trawl body forward of the codend. Based on end results from the preceding...... examinations we will be able to predict size selectivity and escape mortality from the entire trawl body with the appurtenant mortality for different trawl designs......This working paper presents the aims and methodology for a three-year-project (commenced in 2015) assessing size selectivity and escape mortality of Antarctic krill from trawl nets. The project is widely based on acquired experiences from a completed study Net Escapement of Antarctic krill...

  3. Pingston hydroelectric project - stage 2 project report : volume 1 of 2

    International Nuclear Information System (INIS)

    1999-01-01

    The British Columbia Environmental Assessment Office has reviewed an application by Canadian Hydro Developers (B.C.) Inc., to develop the Pingston Hydroelectric Project, a run-of-river facility, located 60 km south of Revelstoke, British Columbia. The review includes an evaluation of any social and environmental impacts, including the effects on migratory birds, small mammals, amphibians, fish, wildlife, water quality, noise and visual aspects, that would be associated with the project. One consideration in selecting the project site was its ease of access along existing roadways and close proximity to power lines, another, the absence of any potential effects on fish and fish habitat. The project is also expected to have a negligible effect on water quality- related matters such as sediment transport, nutrient trapping in the headpond, and movement of large organic debris through the system. The project will not impact on archaeological resources, offers a renewable supply of energy and represents an overall positive effect on air quality for British Columbia. BC Hydro has committed to providing electrical interconnection to the main grid. 9 refs., 5 tabs., 14 figs., 9 appendices

  4. Review of selected contributions of the conference 'Project control in quality management systems'

    International Nuclear Information System (INIS)

    2008-04-01

    There were 12 contributions presented of the conference focused on the project management in quality management systems. Contributions were focused both on theoretical problems from the project management area and on the applications in practice in management systems implementation in accordance with the standards: STN EN ISO 9001:2000, STN EN ISO 14 001:2005, and OHSAS 18 001:1999. One contribution was focused on the project management in the project of preparation of finishing of the building of the Nuclear Power Plant Mochovce of 3. and 4. block and one contribution was focused on the amendment of the Atomic Act or on the preparation of the new Atomic Act with regard to duty of transposition of the Directive of the Council 2006/117/Euratom on control and supervision of the overseas transportations of radioactive waste and nuclear fuel burnt-up into legislation of the Slovak Republic

  5. IPAD project overview

    Science.gov (United States)

    Fulton, R. E.

    1980-01-01

    To respond to national needs for improved productivity in engineering design and manufacturing, a NASA supported joint industry/government project is underway denoted Integrated Programs for Aerospace-Vehicle Design (IPAD). The objective is to improve engineering productivity through better use of computer technology. It focuses on development of technology and associated software for integrated company-wide management of engineering information. The project has been underway since 1976 under the guidance of an Industry Technical Advisory Board (ITAB) composed of representatives of major engineering and computer companies and in close collaboration with the Air Force Integrated Computer-Aided Manufacturing (ICAM) program. Results to date on the IPAD project include an in-depth documentation of a representative design process for a large engineering project, the definition and design of computer-aided design software needed to support that process, and the release of prototype software to integrate selected design functions. Ongoing work concentrates on development of prototype software to manage engineering information, and initial software is nearing release.

  6. 1995 project of the year Hanford Environmental compliance project nomination

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, J.R.

    1996-02-01

    The completion of the Hanford Environmental Compliance (HEC) Project in December 1995 brought to a successful close a long line of major contributions to environmental cleanup. Not since the early days of the Hanford Site during and shortly after World War 11 had such a large group of diverse construction activities, with a common goal, been performed at Hanford. Key to this success was the unique combination of 14 subprojects under the HEC Project which afforded the flexibility to address evolving subproject requirements. This strategy resulted in the accomplishment of the HEC Project stakeholders` objectives on an aggressive schedule, at a $33 million cost savings to the customer. The primary objectives of the HEC Project were to upgrade selected Hanford Site facilities and systems to bring them into compliance with current environmental standards and regulations. The HEC Project contributed significantly towards the Hanford site compliance with Clean Water Act, Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements. It provided, in part, those construction activities required to comply with those requirements in the areas of liquid and solid waste treatment and disposal, waste characterization, and groundwater monitoring.

  7. 1995 project of the year Hanford Environmental compliance project nomination

    International Nuclear Information System (INIS)

    Kelly, J.R.

    1996-02-01

    The completion of the Hanford Environmental Compliance (HEC) Project in December 1995 brought to a successful close a long line of major contributions to environmental cleanup. Not since the early days of the Hanford Site during and shortly after World War 11 had such a large group of diverse construction activities, with a common goal, been performed at Hanford. Key to this success was the unique combination of 14 subprojects under the HEC Project which afforded the flexibility to address evolving subproject requirements. This strategy resulted in the accomplishment of the HEC Project stakeholders' objectives on an aggressive schedule, at a $33 million cost savings to the customer. The primary objectives of the HEC Project were to upgrade selected Hanford Site facilities and systems to bring them into compliance with current environmental standards and regulations. The HEC Project contributed significantly towards the Hanford site compliance with Clean Water Act, Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements. It provided, in part, those construction activities required to comply with those requirements in the areas of liquid and solid waste treatment and disposal, waste characterization, and groundwater monitoring

  8. HI-bearing Ultra Diffuse Galaxies in the ALFALFA Survey

    Science.gov (United States)

    Leisman, Lukas; Janowiecki, Steven; Jones, Michael G.; ALFALFA Almost Darks Team

    2018-01-01

    The Arecibo Legacy Fast ALFA (Arecibo L-band Feed Array) extragalactic HI survey, with over 30,000 high significance extragalactic sources, is well positioned to locate gas-bearing, low surface brightness sources missed by optical detection algorithms. We investigate the nature of a population of HI-bearing sources in ALFALFA with properties similar to "ultra-diffuse" galaxies (UDGs): galaxies with stellar masses of dwarf galaxies, but radii of L* galaxies. These "HI-bearing ultra-diffuse" sources (HUDS) constitute a small, but pertinent, fraction of the dwarf-mass galaxies in ALFALFA. They are bluer and have more irregular morphologies than the optically-selected UDGs found in clusters, and they appear to be gas-rich for their stellar mass, indicating low star formation efficiency. To illuminate potential explanations for the extreme properties of these sources we explore their environments and estimate their halo properties. We conclude that environmental mechanism are unlikely the cause of HUDS' properties, as they exist in environments equivalent to that of the other ALFALFA sources of similar HI-masses, however, we do find some suggestion that these HUDS may reside in high spin parameter halos, a potential explanation for their "ultra-diffuse" nature.

  9. 3D workflow for HDR image capture of projection systems and objects for CAVE virtual environments authoring with wireless touch-sensitive devices

    Science.gov (United States)

    Prusten, Mark J.; McIntyre, Michelle; Landis, Marvin

    2006-02-01

    A 3D workflow pipeline is presented for High Dynamic Range (HDR) image capture of projected scenes or objects for presentation in CAVE virtual environments. The methods of HDR digital photography of environments vs. objects are reviewed. Samples of both types of virtual authoring being the actual CAVE environment and a sculpture are shown. A series of software tools are incorporated into a pipeline called CAVEPIPE, allowing for high-resolution objects and scenes to be composited together in natural illumination environments [1] and presented in our CAVE virtual reality environment. We also present a way to enhance the user interface for CAVE environments. The traditional methods of controlling the navigation through virtual environments include: glove, HUD's and 3D mouse devices. By integrating a wireless network that includes both WiFi (IEEE 802.11b/g) and Bluetooth (IEEE 802.15.1) protocols the non-graphical input control device can be eliminated. Therefore wireless devices can be added that would include: PDA's, Smart Phones, TabletPC's, Portable Gaming consoles, and PocketPC's.

  10. Understanding the costs and schedule of hydroelectric projects

    International Nuclear Information System (INIS)

    Merrow, E.W.; Schroeder, B.R.

    1991-01-01

    This paper is based on a study conducted for the World Bank which evaluated the feasibility of developing an empirically based ex ante project analysis system for hydroelectric projects. The system would be used to assess: the reasonableness of engineering-based cost and schedule estimates used for project appraisal and preliminary estimates used to select projects for appraisal; and the potential for cost growth and schedule slip. The system would help identify projects early in the project appraisal process that harbor significantly higher than normal risks of overrunning cost and schedule estimates

  11. Logic and Natural selection

    Czech Academy of Sciences Publication Activity Database

    Peregrin, Jaroslav

    2010-01-01

    Roč. 4, č. 2 (2010), s. 207-223 ISSN 1661-8297 R&D Projects: GA ČR(CZ) GAP401/10/1279 Institutional research plan: CEZ:AV0Z9009908 Keywords : logic * natural selection * modus potens * inferentialism Subject RIV: AA - Philosophy ; Religion

  12. 1-MWp electrical photovoltaic plant (EPHOP - project)

    International Nuclear Information System (INIS)

    Vitanov, P.; Toneva, A.; Petkanchin, L.; Ivancheva, J.; Neshev, S.

    2000-01-01

    The presented project concerns the realization of a grid connected 1-MW p pilot photovoltaic plant on the territory of Bulgaria.The purpose of the project is to demonstrate and prove solar energy advantages. A special attention will be paid to the possibility the generated electricity to join the national electric network. The site selection according to the meteorological conditions as well as general aspects of the project are discussed

  13. Scheduling in Engineering, Project, and Production Management

    OpenAIRE

    Chien-Ho Ko

    2015-01-01

    This issue presents five papers selected from the 2013 (4th) International Conference on Engineering, Project, and Production Management (EPPM2013) held in Bangkok, Thailand. Three of the papers deal with scheduling problems faced in project and production management, while the remaining two focus on engineering management issues.

  14. Software project management in a changing world

    CERN Document Server

    Ruhe, Günther

    2014-01-01

    By bringing together various current direc­tions, Software Project Management in a Changing World focuses on how people and organizations can make their processes more change-adaptive. The selected chapters closely correspond to the project management knowledge areas introduced by the Project Management Body of Knowledge, including its extension for managing software projects. The contributions are grouped into four parts, preceded by a general introduction. Part I "Fundamentals" provides in-depth insights into fundamental topics including resource allocation, cost estimation and risk manage

  15. Baltic NPP Project specifics and current status

    International Nuclear Information System (INIS)

    2011-01-01

    Project overview: 2 x 1194 MW Units (AES-2006 series); Location in Kaliningrad region of the; Russian Federation; Operation dates: Unit 1 – Oct 2016; Unit 2 – Apr 2018; Site preparatory works ongoing. This is first NPP project in the Russian Federation providing opportunity for participation of foreign investors. Foreign investors may acquire up to 49% share. Cross-border transmission lines developed under separate project with participation of foreign investors. Conclusion: At the selected set of assumptions, the project is financially feasible in all scenarios

  16. Assessment of Non-Financial Criteria in the Selection of Investment Projects for Seed Capital Funding: the Contribution of Scientometrics and Patentometrics

    Directory of Open Access Journals (Sweden)

    Gustavo da Silva Motta

    2012-09-01

    Full Text Available The aim of this article is to assess the potential of using scientometric and patentometric indicators as a way of instrumentalizing the selection process of projects for seed capital funding. There is an increasing interest in technology based enterprises for their capacity to contribute to economic and social development, but there is also some difficulty in assessing non-financial criteria associated with technology for the purposes of financial funding. Thus, this research selected the case of the first enterprise invested in by the largest seed capital fund in Brazil, in order to create scientific and technological indicators and to assess the extent to which these indicators may contribute to understanding the market potential of the technology once it is assessed. It was concluded that scientometric and patentometric indicators favour the assessment process for non-financial criteria, in particular those criteria dealt with in this study: technology, market, divestment, and team.

  17. Using Vision System Technologies for Offset Approaches in Low Visibility Operations

    Science.gov (United States)

    Kramer, Lynda J.; Bailey, Randall E.; Ellis, Kyle K.

    2015-01-01

    Flight deck-based vision systems, such as Synthetic Vision Systems (SVS) and Enhanced Flight Vision Systems (EFVS), have the potential to provide additional margins of safety for aircrew performance and enable the implementation of operational improvements for low visibility surface, arrival, and departure operations in the terminal environment with equivalent efficiency to visual operations. Twelve air transport-rated crews participated in a motion-base simulation experiment to evaluate the use of SVS/EFVS in Next Generation Air Transportation System low visibility approach and landing operations at Chicago O'Hare airport. Three monochromatic, collimated head-up display (HUD) concepts (conventional HUD, SVS HUD, and EFVS HUD) and three instrument approach types (straight-in, 3-degree offset, 15-degree offset) were experimentally varied to test the efficacy of the SVS/EFVS HUD concepts for offset approach operations. The findings suggest making offset approaches in low visibility conditions with an EFVS HUD or SVS HUD appear feasible. Regardless of offset approach angle or HUD concept being flown, all approaches had comparable ILS tracking during the instrument segment and were within the lateral confines of the runway with acceptable sink rates during the visual segment of the approach. Keywords: Enhanced Flight Vision Systems; Synthetic Vision Systems; Head-up Display; NextGen

  18. Project management plan for the 105-C Reactor interim safe storage project. Revision 1

    International Nuclear Information System (INIS)

    Miller, R.L.

    1997-01-01

    In 1942, the Hanford Site was commissioned by the US Government to produce plutonium. Between 1942 and 1955, eight water-cooled, graphite-moderated reactors were constructed along the Columbia River at the Hanford Site to support the production of plutonium. The reactors were deactivated from 1964 to 1971 and declared surplus. The Surplus Production Reactor Decommissioning Project (BHI 1994b) will decommission these reactors and has selected the 105-C Reactor to be used as a demonstration project for interim safe storage at the present location and final disposition of the entire reactor core in the 200 West Area. This project will result in lower costs, accelerated schedules, reduced worker exposure, and provide direct benefit to the US Department of Energy for decommissioning projects complex wide. This project sets forth plans, organizational responsibilities, control systems, and procedures to manage the execution of the Project Management Plan for the 105-C Reactor Interim Safe Storage Project (Project Management Plan) activities to meet programmatic requirements within authorized funding and approved schedules. The Project Management Plan is organized following the guidelines provided by US Department of Energy Order 4700.1, Project Management System and the Richland Environmental Restoration Project Plan (DOE-RL 1992b)

  19. A PERSPECTIVE ON PRIORITIZATION IN PROJECT PORTFOLIO ENVIRONMENT

    OpenAIRE

    Eberhardt, Henrik; Lindblom, David

    2011-01-01

    The overbridging aspect of this interpretative master thesis is the implementation of a project prioritizing strategy. The concept is subdivided into three processes and entities, which could be seen as tools; project management office(PMO), project evaluation and project selection, which in turn are discussed separately. The thesis investigates how the tools impact the prioritizing strategy and why a company must follow a certain prioritizing strategy. The primary focus has been an IS/IT dep...

  20. Discounted Cash Flow and Modern Asset Pricing Methods - Project Selection and Policy Implications

    Energy Technology Data Exchange (ETDEWEB)

    Emhjellen, Magne; Alaouze, Chris M

    2002-07-01

    We examine the differences in the net present values (NPV's) of North Sea oil projects obtained using the Weighted Average Cost of Capital (WACC) and a Modern Asset Pricing (MAP) method which involves the separate discounting of project cash flow components. NPV differences of more than $1 Om were found for some oil projects. Thus, the choice of valuation method will affect the development decisions of oil companies. The results of the MAP method are very sensitive to the choice of parameter values for the stochastic process used to model oil prices. Further research is recommended before the MAP method is used as the sole valuation model. (author)