WorldWideScience

Sample records for holiday inspection service

  1. 9 CFR 590.128 - Holiday inspection service.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Holiday inspection service. 590.128... of Service § 590.128 Holiday inspection service. (a) When an official plant requires inspection service on a holiday or a day designated in lieu of a holiday, such service is considered holiday work...

  2. 9 CFR 381.38 - Overtime and holiday inspection service.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Overtime and holiday inspection... Inspection; Overtime and Holiday Service; Billing Establishments § 381.38 Overtime and holiday inspection... Program, at the rate specified in § 391.3, for the cost of the inspection service furnished on any holiday...

  3. 9 CFR 307.5 - Overtime and holiday inspection service.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Overtime and holiday inspection... INSPECTION AND CERTIFICATION FACILITIES FOR INSPECTION § 307.5 Overtime and holiday inspection service. (a..., at the rate specified in § 391.3, for the cost of the inspection service furnished on any holiday as...

  4. 9 CFR 381.39 - Basis of billing for overtime and holiday services.

    Science.gov (United States)

    2010-01-01

    ... holiday services. 381.39 Section 381.39 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE... Inspection; Overtime and Holiday Service; Billing Establishments § 381.39 Basis of billing for overtime and holiday services. (a) Each recipient of overtime or holiday inspection service, or both, shall be billed...

  5. 9 CFR 307.6 - Basis of billing for overtime and holiday services.

    Science.gov (United States)

    2010-01-01

    ... holiday services. 307.6 Section 307.6 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE... overtime and holiday services. (a) Each recipient of overtime or holiday inspection service, or both, shall... his day's assignment and left the premises, or called back to duty during any overtime or holiday...

  6. 76 FR 80326 - 2012 Rate Changes for the Basetime, Overtime, Holiday, and Laboratory Services Rates

    Science.gov (United States)

    2011-12-23

    ..., Holiday, and Laboratory Services Rates AGENCY: Food Safety and Inspection Service, USDA. ACTION: Notice... voluntary, overtime, and holiday inspection and identification, certification, and laboratory services. The 2012 basetime, overtime, holiday, and laboratory services rates will be applied on the first FSIS pay...

  7. 9 CFR 592.530 - Holiday rate.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Holiday rate. 592.530 Section 592.530... INSPECTION VOLUNTARY INSPECTION OF EGG PRODUCTS Fees and Charges § 592.530 Holiday rate. When an official plant requires inspection service on a holiday or a day designated in lieu of a holiday, such service is...

  8. 46 CFR 9.7 - Rate for Sunday or holiday services.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Rate for Sunday or holiday services. 9.7 Section 9.7... COMPENSATION FOR OVERTIME SERVICES § 9.7 Rate for Sunday or holiday services. The rate of extra compensation for Sunday or holiday services is hereby fixed at twice the gross daily rate of regular pay of the...

  9. 7 CFR 91.39 - Premium hourly fee rates for overtime and legal holiday service.

    Science.gov (United States)

    2010-01-01

    ... legal holidays or what constitutes overtime service at a particular Science and Technology laboratory is... Premium hourly fee rates for overtime and legal holiday service. (a) When analytical testing in a Science... overtime work. When analytical testing in a Science and Technology facility requires the services of...

  10. 9 CFR 391.3 - Overtime and holiday rate.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Overtime and holiday rate. 391.3 Section 391.3 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE... AND LABORATORY ACCREDITATION § 391.3 Overtime and holiday rate. The overtime and holiday rate for...

  11. 7 CFR 58.39 - Fees for holiday or other nonworktime.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Fees for holiday or other nonworktime. 58.39 Section... Dairy Products Fees and Charges § 58.39 Fees for holiday or other nonworktime. If an applicant requests that inspection or grading service be performed on a holiday, Saturday, or Sunday or in excess of each...

  12. In-service inspection techniques

    International Nuclear Information System (INIS)

    Backfisch, W.; Zipser, R.R.

    1980-01-01

    The owner of a nuclear power plant (NPP) is obligated and interested to maintain - by regular maintenance and in-service inspections - the operational safety and availability of the plant for the subsequent operating period in a condition, as is specified as the basis of the erection and the last operational permits. In-service inspections are performed to verify the operational safety, and maintenance work is performed to guarantee the availability. Below, the typical in-service inspections of a light-water reactor NPP (operated on a pressurized-water reactor or on a boiling-water reactor) are described with details and examples of typical inspections, especially of recurrent performance tests of the systems. (orig./RW)

  13. A web environment for inspection service

    International Nuclear Information System (INIS)

    Robles Guemes, N.; Garcia Heras, M.; Cueto-Felgueroso Garcia, C.; Pelaez Gutierrez, J. A.

    2013-01-01

    The in-service inspection fundamental objective is to maintain the structural integrity of structures, systems and components during the life in the installation service. Nuclear power plants are required to implement a Service inspection program in accordance with the established regulation by the Regulatory body.

  14. Food Safety When Preparing Holiday Meals

    Science.gov (United States)

    ... Public Health Current: Remember Food Safety when Preparing Holiday Meals Services and Programs Regulation & Licensure Vital Records ... food safety is especially important as they prepare holiday meals. Many holiday dinners include meat and poultry, ...

  15. In-service inspection and periodic testing

    International Nuclear Information System (INIS)

    Eisele, H.; Meyer, F.A.; Zipser, R.R.

    1981-01-01

    In-service inspections are performed to verify the operational safety, and maintenance work is performed to guarantee the availability. Below, the typical in-service inspections of a light-water reactor NPP (operated on a pressurized-water reactor/PWR/ or on a boiling-water reactor/BWR/) are described with details and examples of typical inspections, especially of recurrent performance tests of the systems. (orig./RW)

  16. In-service inspection and periodic testing

    International Nuclear Information System (INIS)

    Eisele, H.; Meyer, F.A.; Zipser, R.R.

    1980-01-01

    In-service inspections are performed to verify the operational safety, and maintenance work is performed to guarantee the availability. In the present paper, the typical in-service inspections of a light-water reactor NPP (operated on a pressurized-water reactor/PWR/ or on a boiling-water reactor/BWR/) are described with details and examples of typical inspections, especially of recurrent performance tests of the systems. (orig./RW)

  17. Periodic and in-service inspection programs

    International Nuclear Information System (INIS)

    Dinu, M.

    2000-01-01

    Periodic and in-service inspection programs for Cernavoda NPP consists of periodic inspections of CANDU NPP components CSAN N-285.4 and CSAN N-285.4, in-service inspections and repair and modifications general inspection. Periodic inspection program document (PIPD) determines the systems and components subject to inspection, the category of the inspection, techniques, areas and other details.The current status of the inspection programs is presented, including containment , erosion/corrosion, pressure vessel support and snubbers, main steam lines inspection programs. Qualification program in Cernavoda NPP involves equipment qualification in the on-site laboratory, yearly certification, special equipment qualification in the National Institute of Metrology. All procedures are approved by the ISCIR (regulatory body for pressure vessel and lifting equipment) and CNCAN (National Commission on Nuclear Activities Control). Qualification of the personnel is performed according to the ISCIR Technical prescription CR 11/82 for up to 3 year period. Final qualification and licensing is performed by CNCAN

  18. holiday(holidays),leave和vacation

    Institute of Scientific and Technical Information of China (English)

    张德兴

    2003-01-01

    holiday(holidays),leave和vacation这几个词都有“假日(期)”的意思,但含义用法并不相同。 holiday(holidays)一般指“休假”。 Tom and I are going to have a holiday.我和汤姆准备去度假。 I’ve already had my holidays this year.我今年已经度过假了。 During a holiday in Sweden,I found this note on my car. 在瑞典度假期间,我在我的车子上发现了这张字条。

  19. Northeast Inspection Services, Inc. boresonic inspection system evaluation

    International Nuclear Information System (INIS)

    Nottingham, L.D.; Sabourin, P.F.; Presson, J.H.

    1993-04-01

    Turbine rotor reliability and remaining life assessment are continuing concerns to electric utilities. Over the years, boresonic inspection and evaluation have served as primary components in rotor remaining life assessment. Beginning with an evaluation of TREES by EPRI in 1982, a series of reports that document the detection and sizing capabilities of several boresonic systems have been made available. These studies should provide utilities with a better understanding of system performance and lead to improved reliability when predicting rotor remaining life. In 1990, the procedures followed for evaluating rotor boresonic performance capabilities were changed to transfer a greater portion of the data analysis function to the participating vendor. This change from previous policy was instituted so that the evaluation results would better reflect the ''final answer'' that a vendor would provide in a real rotor inspection and also to reduce the cost of an evaluation. Among the first vendors to participate in the new performance demonstration was Northeast Inspection Services, Inc. (NISI). The tests reported herein were conducted by NISI personnel under the guidelines of the new plan. Details of the new evaluation plan are also presented. Rotor bore blocks containing surface-connected fatigue cracks, embedded glass beads, and embedded radial-axial oriented disks were used in the evaluation. Data were collected during twenty-five independent passes through the blocks. The evaluation consisted of statistical characterization of the detection capabilities, flaw sizing and location accuracy, and repeatability of the inspection system. The results of the evaluation are included in this report

  20. Optimizing pre-service inspection data

    International Nuclear Information System (INIS)

    Mullins, L.E.; Harrison, J.M.

    1986-01-01

    The phenomenon of intergranular stress corrosion cracking (IGSCC) in nuclear power plant piping systems has been the single biggest factor in an evolution that has changed and continues to change in-service inspection practices and philosophy throughout the industry. In-service inspection has been found to deal with several distinct phases of the problem. At the onset, existing technology was demonstrated to be unable to detect IGSCC adequately. This inability to detect IGSCC was soon overcome. However, it immediately pointed out the difficulties associated with the discrimination between IGSCC and other harmless metallurgical conditions. On the heels of detection and discrimination came problems associated with determining crack size and the monitoring of overlayed flaws. A wealth of information has been written on all phases of IGSCC; however, one particular aspect has as of yet seen little attention. With an increasing number of plants choosing to replace flawed pipe, the pre-service inspection of the replaced piping demands increased attention. The lessons learned through inspection for IGSCC need again to be applied to the replacement piping. Through increased attention at installation, many of the difficulties associated with proper inservice inspection may be reduced or eliminated, thereby realizing an economy in outage scheduling, personnel exposure, and, overall, a more reliable in-service examination

  1. Federal Holidays

    Data.gov (United States)

    Office of Personnel Management — Federal law (5 U.S.C. 6103) establishes the following public holidays for Federal employees. Please note that most Federal employees work on a Monday through Friday...

  2. holiday与 holidays

    Institute of Scientific and Technical Information of China (English)

    王振元

    2014-01-01

    在《牛津小学英语》6A中,出现了Holiday这一单元,平时我们也会遇到holidays.那么houliday和holidays有哪些区别呢?1.holiday是单数形式.表示“短假期”,通常指“一两天”.如:I will have a holiday next Monday.下个星期一我有一天假期.

  3. Designing for in-service inspection

    International Nuclear Information System (INIS)

    Dixit, K.B.

    2002-01-01

    The process of design of components, equipment and systems normally focuses on functional requirements, integrity and environmental conditions. Manufacturing processes, fabricability, inspectability and maintainability in service are considered while designing. Provisions for the requirements of ISI also need to be given due consideration while designing the systems, equipment and components

  4. 76 FR 20220 - New Formulas for Calculating the Basetime, Overtime, Holiday, and Laboratory Services Rates; Rate...

    Science.gov (United States)

    2011-04-12

    ... consistently the term ``regular hours.'' The term ``regular hours'' refers to the hours during regular working... during non-overtime and non-holiday hours of operation. Official establishments and official egg products.... FSIS developed proposed formulas in consultation with a private accounting firm to determine the rates...

  5. Risk informed In-service Inspection

    International Nuclear Information System (INIS)

    Corak, Z.

    2003-01-01

    Safety of nuclear power plants is one of the most important conditions for their acceptance. Safety is being acheived by numerous methods and techniques in phase of design, manufacturing and maintenance of the nuclear power plants. In-service Inspection (ISI) has a significant role in avoidances of failure in components of nuclear power plants just the same as in assurance of their integrity. Non-destructive examinations are performed periodically in accordance with 10 CFR 50 50.55a and ASME Boiler and Pressure Vessel Code section XI which is referenced by 10 CFR 50.55a. Nondestructive examinations provide information about a current condition of equipment at nuclear power plants and about any damage, defect or degradation mechanism. A lot of effort is often spent in situations in which the probability of failure and their effects on safety have a very low impact. Practical experience shows that failures can often occur at locations where the inspection has never been performed. Costs and expenses of in-service inspections are very high. Therefore, the accent has to be on locations with significant risk to safety. Many years of nuclear power plants' operation and maintenance have resulted in a more broad knowledge of degradation mechanism and the most susceptible locations and huge databases of different nuclear power plants' components. U.S. Nuclear Regulatory Commission (NRC) and the nuclear industry have recognized that probabilistic risk assessment (PRA) has developed and changed to be more useful in improvement of traditional engineering approaches in nuclear power plants regulation. After the publication of its policy statement on the use of PRA in nuclear regulatory activities, the Commission ordered the NRC staff to develop a regulatory framework that incorporated risk insights. The American Society of Mechanical Engineers (ASME) initiated Code Case N-560, N-577, and N-578 that address the importance of categorization and inspection of piping using risk

  6. Pre-service inspection and in-service inspection in Japan

    International Nuclear Information System (INIS)

    Uebayashi, T.; Miyake, Y.

    1985-01-01

    To ensure the safety of nuclear power plant, pre-service inspection/in-service inspection (PSI/ISI) has an important role, and informations obtained from various inspections during plant shut-down period are contributing to establish effective preventive maintenance activities for plant facilities. It might be said that the high level of availability of Japanese light-water nuclear power plants in these two or three years has been achieved by those efforts. In case of Japan, inspections to be carried out during scheduled plant shut-down period are not limited to code requirements but include many other inspections which are mostly reflected from troubles experienced in both domestic and overseas plants. Usually, those additional inspections are performed by Ministry of Trade and Industries' (MITI's) regulator and/or tentative requirement and considered as ISI in broad meaning. To achieve high availability of plant, it is essential to avoid unscheduled shut-down and to shorten inspection period. The developments of new technology to perform effective ISI for operating plants are continued, but on the other hand it is also very important to pay a great consideration to inspectability of the plants at the stage of plant engineering. With the leadership of MITI, improvement and standardization of light-water nuclear power plant has been proceeded and newly constructed plants have great advantage from the point of view on ISI

  7. Holiday Overhaul

    Institute of Scientific and Technical Information of China (English)

    2007-01-01

    Reform has brought hope,but also concern,to workers across ChinaThe National Development and Reform Commission published a plan to change China’s golden week holiday system on November 9.The change sees the end of the three-day May Day holiday and the creation of three single-day holidays that fall on traditional Chinese festivals—the Tomb-Sweeping Day,the Dragon Boat Festival and the Mid- Autumn Festival.One day off work remains on May Day. The change increases the number of non-working daYs per year from 114 to 115. In addition,according to a newly issued paid vacation plan,workers who remain in the same company for more than one year should enjoy a paid vacation,the length of

  8. New Swedish regulations in the area of plant inspection and in-service inspection

    International Nuclear Information System (INIS)

    Hansson, B.

    1998-01-01

    History and present status od Swedish regulations in the field of NPP inspection and in-service inspection are described. The presentation focuses on the development of regulations and establishing new ones. A description of different organisations involved is included

  9. In-service inspections of V-230 reactor

    International Nuclear Information System (INIS)

    Prepechal, J.

    1984-01-01

    It is stated that despite certain constraints the configuration of the WWER-440 is such that it allows to make in-service inspections on a fully satisfactory scale. Three factors are discussed whose existence is necessary for the implementation of in-service inspections. The program defining the scale of inspections is satisfactory with regard to the safety and reliability of reactor operation. Its further development must result in reducing time consumption and radiation burden of personnel. Regulations for the implementation and evaluation of inspections represent the weakest link in the system of in-service inspections. At present, various organizations are dealing with the said problem within international cooperation. Equipment for in-service inspections of WWER-440 reactors is relatively good. The most important knowledge is summed up gained from the ten pre-service and in-service inspections of reactors of this type made so far. (Z.M.)

  10. Holiday thrombosis.

    Science.gov (United States)

    Lippi, Giuseppe; Franchini, Massimo; Favaloro, Emmanuel J

    2011-11-01

    The pathogenesis of acute thrombosis, either arterial or venous, is typically multifactorial and involves a variety of factors that may be considered relatively "innocuous" when present alone. When someone is unlucky enough to accumulate several risk factors, compounded in many cases by one or more acute triggers, that person may be propelled over a threshold that precipitates the development of an acute episode of thrombosis. There is now reliable evidence that acute thromboses (both venous thromboembolism and acute coronary syndrome) follow a typical seasonal pattern and particularly display a characteristic spike during holiday periods. Overindulgence and abrupt changes of several lifestyle habits have been described as potential precipitating factors during such periods. Long travels, unhealthy diet, excessive or binge drinking and eating, decreased or increased physical activity, emotional and psychological stress, might all variably contribute to trigger an acute thrombotic event. Although the real causes of this "holiday phenomenon" remain speculative as yet, there is a widespread perception that they might represent preventable events like several other risk factors of both venous and arterial thrombosis. Beside drastic and unrealistic measures, such as canceling such holidays from the calendar, it seems reasonable to at least provide advice to patients about these "dangers," especially those individuals believed to be carrying a higher risk. Many (if not all) patients may ignore such advice and carry on regardless, but they should be given the benefit of informed choice. © Thieme Medical Publishers.

  11. In-service inspection of pressurized water reactors

    International Nuclear Information System (INIS)

    Rapin, M.; Saglio, R.

    1983-01-01

    French legislation, which is more demanding than in other countries, had led Electricite de France, the State-owned utility, to acquire better performance in-service inspection facilities than those which existed previously. This fact has spurred the industrial development of the new technical facilities which are used worldwide today. This article presents the ''in-service inspection machine'' (MIS) for the inspection of the welds of a PWR vessel, and the inspection device of steam generator tubes; the MIS allow a remote-viewing, ultrasonic and gamma-graphic inspection; Foucault currents are the only one method adapted to the inspection steam generator tubes [fr

  12. STRUCTURAL CHALLENGES OF HOLIDAY PLACEMENT ...

    African Journals Online (AJOL)

    User

    of Social Services did not have adequate resources in form of finance, human capital ... through participatory programming is fundamental in strengthening holiday .... involvement in corporate social responsibility programmes in Zimbabwe.

  13. EVALUATION OF SERVICE QUALITY OF HOTEL AND HOLIDAY RESERVATION WEB SITES IN TURKEY BY INTEGRATED SWARA - GRAY RELATIONSHIP ANALYSIS METHOD

    OpenAIRE

    Cakir, Engin; Akel, Gokhan

    2017-01-01

    With the development and widespread use of technology,the rate of Internet use in the world is rapidly increasing. It has made ourlife even easier as almost all of our daily needs are met through the internet.The widespread use of the Internet has influenced many sectors and has alsoinfluenced the tourism industry, enabling many online hotels and holiday booking websites to emerge. Hotels and holiday bookingwebsites have provided facilities for hotel and holiday selection, and offermany oppor...

  14. 46 CFR 9.5 - Night, Sunday, and holiday defined.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Night, Sunday, and holiday defined. 9.5 Section 9.5... COMPENSATION FOR OVERTIME SERVICES § 9.5 Night, Sunday, and holiday defined. (a) For the purpose of this part... term holiday shall mean only national legal public holidays, viz., January 1, February 22, May 30, July...

  15. In-service inspection guidelines for composite aerospace structures

    International Nuclear Information System (INIS)

    Heida, Jaap H.; Platenkamp, Derk J.

    2012-01-01

    The in-service inspection of composite aerospace structures is reviewed, using the results of a evaluation of promising, mobile non-destructive inspection (NDI) methods. The evaluation made use of carbon fibre reinforced specimens representative for primary composite aerospace structures, including relevant damage types such as impact damage, delaminations and disbonds. A range of NDI methods were evaluated such as visual inspection, vibration analysis, phased array ultrasonic inspection, shearography and thermography inspection. Important aspects of the evaluation were the capability for defect detection and characterization, portability of equipment, field of view, couplant requirements, speed of inspection, level of training required and the cost of equipment. The paper reviews the damage tolerance design approach for composites, and concludes with guidelines for the in-service inspection of composite aerospace structures.

  16. The new French code for PWR in service inspection

    Energy Technology Data Exchange (ETDEWEB)

    Noel, R; Hutin, J P [Electricite de France (EDF), 75 - Paris (France)

    1988-12-31

    This document presents the new french code for pressured water reactor in service inspection. The historic regulatory basis is presented, together with the new regulatory act (dating back to the 26 february 1974) and the major guidelines of the french practice for in service inspection of PWR components. (TEC).

  17. Enhanced InService Inspection system for BWR plant

    International Nuclear Information System (INIS)

    Shouji, Hajime; Kobayashi, Teruo; Nagao, Tetsuya

    1993-01-01

    An enhanced InService Inspection system (ISI) has been developed, consisting of newly designed automated scanners, automated pipe inspection system and a high speed data acquisition/analysis station. This system uses a trackless magnetic crawler type nozzle inspection scanner attached to the nozzle shoulder by magnetic wheels. The automated pipe inspection system consists of an automated scanner, controller and high speed data acquisition station. These advanced automatic inspection systems are very useful for ISI, especially in reducing the radiation exposure and time required. (author)

  18. An empirical thesis of service recovery in the package holiday industry

    OpenAIRE

    By, Angelica; Kaspersson, Elisabeth

    2018-01-01

    Purpose: The aim of this thesis is to gain an understanding what it is within the vacation offering that makes certain customers dissatisfied with a service recovery effort. Design/methodology/approach: The basis of the thesis is a qualitative approach since we want to gain an understanding about what it is in the service failure and service recovery that make customers dissatisfied. Although, a quantitative approach will be used as a supplement to the qualitative approach in order to seek pa...

  19. In service inspection of superphenix 1 vessels: MIR

    International Nuclear Information System (INIS)

    Asty, M.; Viard, J.; Lerat, B.; Saglio, R.

    1985-02-01

    Presentation of the in-service inspection device, MIR, which has been specially developed for the visual and ultrasonic examination of Super Phenix 1 vessels (surface and internal defects). The inspections take place during fuel handling operations. The inspection device is a robot with a four-wheel drive vehicle which guidance along the welds is achieved by eddy-current devices; visual examination is performed by a television camera and ultrasonic probes are specially resistent to high temperatures

  20. 7 CFR 944.400 - Designated inspection services and procedure for obtaining inspection and certification of...

    Science.gov (United States)

    2010-01-01

    ... Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing Agreements and Orders; Fruits, Vegetables... Agricultural Marketing Agreement Act of 1937, as amended. (a) The Federal or Federal-State Inspection Service, Fruit and Vegetable Division, Agricultural Marketing Service, United States Department of Agriculture is...

  1. In-service inspection in the Superphenix 1 vessels interspace

    International Nuclear Information System (INIS)

    Asty, M.; Saglio, R.

    1983-03-01

    The design of Superphenix 1 reactor vessels allows their in-service inspection. A self-propelling engine, the MIR, has been concieved for this need: it can do a visual and ultrasonic inspection. The MIR can move in the whole vessels interspace. The operating conditions are specified and the principle characteristics of the MIR engine are presented [fr

  2. Correcting for day of the week and public holiday effects: improving a national daily syndromic surveillance service for detecting public health threats.

    Science.gov (United States)

    Buckingham-Jeffery, Elizabeth; Morbey, Roger; House, Thomas; Elliot, Alex J; Harcourt, Sally; Smith, Gillian E

    2017-05-19

    As service provision and patient behaviour varies by day, healthcare data used for public health surveillance can exhibit large day of the week effects. These regular effects are further complicated by the impact of public holidays. Real-time syndromic surveillance requires the daily analysis of a range of healthcare data sources, including family doctor consultations (called general practitioners, or GPs, in the UK). Failure to adjust for such reporting biases during analysis of syndromic GP surveillance data could lead to misinterpretations including false alarms or delays in the detection of outbreaks. The simplest smoothing method to remove a day of the week effect from daily time series data is a 7-day moving average. Public Health England developed the working day moving average in an attempt also to remove public holiday effects from daily GP data. However, neither of these methods adequately account for the combination of day of the week and public holiday effects. The extended working day moving average was developed. This is a further data-driven method for adding a smooth trend curve to a time series graph of daily healthcare data, that aims to take both public holiday and day of the week effects into account. It is based on the assumption that the number of people seeking healthcare services is a combination of illness levels/severity and the ability or desire of patients to seek healthcare each day. The extended working day moving average was compared to the seven-day and working day moving averages through application to data from two syndromic indicators from the GP in-hours syndromic surveillance system managed by Public Health England. The extended working day moving average successfully smoothed the syndromic healthcare data by taking into account the combined day of the week and public holiday effects. In comparison, the seven-day and working day moving averages were unable to account for all these effects, which led to misleading smoothing

  3. Correcting for day of the week and public holiday effects: improving a national daily syndromic surveillance service for detecting public health threats

    Directory of Open Access Journals (Sweden)

    Elizabeth Buckingham-Jeffery

    2017-05-01

    Full Text Available Abstract Background As service provision and patient behaviour varies by day, healthcare data used for public health surveillance can exhibit large day of the week effects. These regular effects are further complicated by the impact of public holidays. Real-time syndromic surveillance requires the daily analysis of a range of healthcare data sources, including family doctor consultations (called general practitioners, or GPs, in the UK. Failure to adjust for such reporting biases during analysis of syndromic GP surveillance data could lead to misinterpretations including false alarms or delays in the detection of outbreaks. The simplest smoothing method to remove a day of the week effect from daily time series data is a 7-day moving average. Public Health England developed the working day moving average in an attempt also to remove public holiday effects from daily GP data. However, neither of these methods adequately account for the combination of day of the week and public holiday effects. Methods The extended working day moving average was developed. This is a further data-driven method for adding a smooth trend curve to a time series graph of daily healthcare data, that aims to take both public holiday and day of the week effects into account. It is based on the assumption that the number of people seeking healthcare services is a combination of illness levels/severity and the ability or desire of patients to seek healthcare each day. The extended working day moving average was compared to the seven-day and working day moving averages through application to data from two syndromic indicators from the GP in-hours syndromic surveillance system managed by Public Health England. Results The extended working day moving average successfully smoothed the syndromic healthcare data by taking into account the combined day of the week and public holiday effects. In comparison, the seven-day and working day moving averages were unable to account for all

  4. Holidays in lights: Tracking cultural patterns in demand for energy services

    OpenAIRE

    Rom?n, Miguel O.; Stokes, Eleanor C.

    2015-01-01

    Abstract Successful climate change mitigation will involve not only technological innovation, but also innovation in how we understand the societal and individual behaviors that shape the demand for energy services. Traditionally, individual energy behaviors have been described as a function of utility optimization and behavioral economics, with price restructuring as the dominant policy lever. Previous research at the macro?level has identified economic activity, power generation and technol...

  5. Department of Agriculture, Food Safety and Inspection Service

    Science.gov (United States)

    ... Standard Forms FSIS United States Department of Agriculture Food Safety and Inspection Service About FSIS District Offices Careers Contact Us Ask ... Reports Fact Sheets Food Defense and Emergency Response Food Safety Education FSIS ... Assistance Contact Centers Cooperative Agreements Email Subscription ...

  6. Holidays in lights: Tracking cultural patterns in demand for energy services

    Science.gov (United States)

    Román, Miguel O.; Stokes, Eleanor C.

    2015-06-01

    Successful climate change mitigation will involve not only technological innovation, but also innovation in how we understand the societal and individual behaviors that shape the demand for energy services. Traditionally, individual energy behaviors have been described as a function of utility optimization and behavioral economics, with price restructuring as the dominant policy lever. Previous research at the macro-level has identified economic activity, power generation and technology, and economic role as significant factors that shape energy use. However, most demand models lack basic contextual information on how dominant social phenomenon, the changing demographics of cities, and the sociocultural setting within which people operate, affect energy decisions and use patterns. Here we use high-quality Suomi-NPP VIIRS nighttime environmental products to: (1) observe aggregate human behavior through variations in energy service demand patterns during the Christmas and New Year's season and the Holy Month of Ramadan and (2) demonstrate that patterns in energy behaviors closely track sociocultural boundaries at the country, city, and district level. These findings indicate that energy decision making and demand is a sociocultural process as well as an economic process, often involving a combination of individual price-based incentives and societal-level factors. While nighttime satellite imagery has been used to map regional energy infrastructure distribution, tracking daily dynamic lighting demand at three major scales of urbanization is novel. This methodology can enrich research on the relative importance of drivers of energy demand and conservation behaviors at fine scales. Our initial results demonstrate the importance of seating energy demand frameworks in a social context.

  7. Holiday in Lights: Tracking Cultural Patterns in Demand for Energy Services

    Science.gov (United States)

    Roman, Miguel O.; Stokes, Eleanor C.

    2015-01-01

    Successful climate change mitigation will involve not only technological innovation, but also innovation in how we understand the societal and individual behaviors that shape the demand for energy services. Traditionally, individual energy behaviors have been described as a function of utility optimization and behavioral economics, with price restructuring as the dominant policy lever. Previous research at the macro-level has identified economic activity, power generation and technology, and economic role as significant factors that shape energy use. However, most demand models lack basic contextual information on how dominant social phenomenon, the changing demographics of cities, and the sociocultural setting within which people operate, affect energy decisions and use patterns. Here we use high-quality Suomi-NPP VIIRS nighttime environmental products to: (1) observe aggregate human behavior through variations in energy service demand patterns during the Christmas and New Year's season and the Holy Month of Ramadan and (2) demonstrate that patterns in energy behaviors closely track sociocultural boundaries at the country, city, and district level. These findings indicate that energy decision making and demand is a sociocultural process as well as an economic process, often involving a combination of individual price-based incentives and societal-level factors. While nighttime satellite imagery has been used to map regional energy infrastructure distribution, tracking daily dynamic lighting demand at three major scales of urbanization is novel. This methodology can enrich research on the relative importance of drivers of energy demand and conservation behaviors at fine scales. Our initial results demonstrate the importance of seating energy demand frameworks in a social context.

  8. Slimmed May Day Holiday

    Institute of Scientific and Technical Information of China (English)

    Liu Xinwen

    2008-01-01

    @@ Last November the State Council of China decided to renew its holiday system by reducing the seven-day Mav Dav holiday to three days and introducing three new one-day public holidays,namely the Qingming Festival,Dragon Boat Festival and Moon Festival.BY doing so,the three golden-week holidays that were introduced in 1999,namely the Spring Festival,Mav Dav and National Day,could be better distributed.The New Year's Eve holiday would remain one day.The new holiday plan was supposed to take effect in 2008.

  9. 77 FR 11437 - Inspection Service Authority; Seizure and Forfeiture

    Science.gov (United States)

    2012-02-27

    ... POSTAL SERVICE 39 CFR Part 233 Inspection Service Authority; Seizure and Forfeiture AGENCY: Postal... Service's rules and regulations regarding the seizure and forfeiture of property into three sections, 39.... The proposed revision consolidates sections 233.8 and 233.9, and treats seizures involving personal...

  10. Public Holidays of England

    Institute of Scientific and Technical Information of China (English)

    梁泽标

    1992-01-01

    In England, Christmas Day and Good Friday havebeen holidays (literally ’Holy Days’) for religious reasonssince the establishment of Christianity in this country.Christmas is celebrated on December 25, not ChristmasEve as in several other European countries. The otherpublic holidays (or ’Bank Holidays’) are Easter Monday,May Day (May 1st), the Spring Bank Holiday (the lastMonday in May), the Summer Bank Holiday (the last

  11. Planning for Holiday 2011

    Institute of Scientific and Technical Information of China (English)

    2011-01-01

    After a fairly positive back-to-school season, retail is entering into the holidays with pressures across the supply chain. Increased raw materials costs in 2010/2011 coupled with declining consumer confidence and high unemployment, means the holiday season commences with retailers seeking to identify strategies that will help them handle rising costs yet remain competitive to entice the holiday shopper.

  12. The applications of risk-informed in-service-inspection

    International Nuclear Information System (INIS)

    Ting, K.; Ko, T.-H.; Li, Y.-C.; Wu, W.-F.; Lu, Y.-L.; Chien, F.-T.

    2005-01-01

    The US NRC and nuclear industry encouraged the applications of risk-informed In-Service Inspection (RI-ISI) which can be an alternative program to the ASME Section XI In-service Inspection requirements. The Implementation of RI-ISI can improve the substantial cost as well as does reductions. From the aspect of defense in depth for nuclear safety, the achievements of these procedures can identify the inspection rank to promote the integrity of the current inspection program. Thus, this study utilizes this techniques to implement risk assessment on safety class 1 recirculation piping welds where sensitized to IGSCC of Taibei BWR-6 nuclear power plant. In the evaluation process, WinPraise code is used to calculate the failure probabilities of all welds. The result of risk evaluations can be referred to the further regulatory and plant operation. (authors)

  13. PWR reactor vessel in-service-inspection according to RSEM

    International Nuclear Information System (INIS)

    Algarotti, Marc; Dubois, Philippe; Hernandez, Luc; Landez, Jean Paul

    2006-01-01

    Nuclear services experience Framatome ANP (an AREVA and Siemens company) has designed and constructed 86 Pressurized Water Reactors (PWR) around the world including the three units lately commissioned at Ling Ao in the People's Republic of China and ANGRA 2 in Brazil; the company provided general and specialized outage services supporting numerous outages. Along with the American and German subsidiaries, Framatome ANP Inc. and Framatome ANP GmbH, Framatome ANP is among the world leading nuclear services providers, having experience of over 500 PWR outages on 4 continents, with current involvement in more than 50 PWR outages per year. Framatome ANP's experience in the examinations of reactor components began in the 1970's. Since then, each unit (American, French and German companies) developed automated NDT inspection systems and carried out pre-service and ISI (In-Service Inspections) using a large range of NDT techniques to comply with each utility expectations. These techniques have been validated by the utilities and the safety authorities of the countries where they were implemented. Notably Framatome ANP is fully qualified to provide full scope ISI services to satisfy ASME Section XI requirements, through automated NDE tasks including nozzle inspections, reactor vessel head inspections, steam generator inspections, pressurizer inspections and RPV (Reactor Pressure Vessel) inspections. Intercontrole (Framatome ANP subsidiary dedicated in supporting ISI) is one of the leading NDT companies in the world. Its main activity is devoted to the inspection of the reactor primary circuit in French and foreign PWR Nuclear Power Plants: the reactor vessel, the steam generators, the pressurizer, the reactor internals and reactor coolant system piping. NDT methods mastered by Intercontrole range from ultrasonic testing to eddy current and gamma ray examinations, as well as dye penetrant testing, acoustic monitoring and leak testing. To comply with the high requirements of

  14. 7 CFR 160.66 - Fees for inspection services.

    Science.gov (United States)

    2010-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE (CONTINUED) NAVAL STORES REGULATIONS AND... with the cost of the service rendered. Such fees and charges may be announced to the trade in such...

  15. Advanced Approach of Reactor Pressure Vessel In-service Inspection

    International Nuclear Information System (INIS)

    Matokovic, A.; Picek, E.; Pajnic, M.

    2006-01-01

    The most important task of every utility operating a nuclear power plant is the continuously keeping of the desired safety and reliability level. This is achieved by the performance of numerous inspections of the components, equipment and system of the nuclear power plant in operation and in particular during the scheduled maintenance periods at re-fueling time. Periodic non-destructive in-service inspections provide most relevant criteria of the integrity of primary circuit pressure components. The task is to reliably detect defects and realistically size and characterize them. One of most important and the most extensive examination is a reactor pressure vessel in-service inspection. That inspection demand high standards of technology and quality and continual innovation in the field of non-destructive testing (NDT) advanced technology as well as regarding reactor pressure vessel tool and control systems. A remote underwater contact ultrasonic technique is employed for the examination of the defined sections (reactor welds), whence eddy current method is applied for clad surface examinations. Visual inspection is used for examination of the vessel inner surface. The movement of probes and data positioning are assured by using new reactor pressure vessel tool concept that is fully integrated with NDT systems. The successful performance is attributed thorough pre-outage planning, training and successful performance demonstration qualification of chosen NDT techniques on the specimens with artificial and/or real defects. Furthermore, use of advanced approach of inspection through implementation the state of the art examination equipment significantly reduced the inspection time, radiation exposure to examination personnel, shortening nuclear power plant outage and cutting the total inspection costs. The advanced approach as presented in this paper offer more flexibility of application (non-destructive tests, local grinding action as well as taking of boat samples

  16. Targeted In-service Inspections Using Risk Insights

    International Nuclear Information System (INIS)

    Kulat, S.; Montgomery, B.; Robin Graybeal, M.

    2012-01-01

    This paper includes a discussion of the historical background and rationale for development of a targeted In-service Inspection (ISI) program using risk insights, known as Risk-Informed In-service Inspection (RI-ISI). RI-ISI programs are optimized inspection programs which target specific welds for inspection based upon potential degradation mechanisms and consequences of failure. Inspections are performed on those welds that are the highest contributors to plant risk. Additionally the inspections are tailored to detect the specific postulated degradation mechanisms. As a result, the numbers of inspections are reduced along with the associated cost and radiation exposure, while maintaining or improving the level of quality and safety. Provided in this paper are the basic principles of RI-ISI program development, and a summary of the impact of the implementation of such programs. For example, implementation of a Risk-Informed In-service Inspection program results in a reduction of both cost and radiation exposure. Cost savings are estimated at between USD 1,000,000 and USD 2,300,000 per unit per ten year interval for a Class 1 and2 RI-ISI application. Cost savings are estimated based on average cost per weld of USD 7600 for examination, including the following activities: erection and removal of scaffolding, removal and replacement of insulation, removal and replacement of interferences, weld preparation, examination, documentation, craft support. Reduction in radiation exposure is estimated at 75% to 90% for a Class 1 and2 RI-ISI application. Reduction in radiation exposure is due to the following factors: number of welds selected for examination decreases by 60% to 75%, surface examinations essentially eliminated, within a given risk category, welds can be selected for examination based on additional factors such as the minimization of radiation exposure.(author).

  17. A sun holiday is a sunburn holiday

    DEFF Research Database (Denmark)

    Petersen, Bibi; Thieden, Elisabeth; Philipsen, Peter Alshede

    2013-01-01

    Many people take holidays in sunny locations with the express aim of sunbathing. This may result in sunburn, which is a risk factor for skin cancer. We investigated 25 Danish sun seekers during a week's holiday in the Canary Islands. The percentage of body surface area with sunburn was determined......-specific UVR doses after adjustment for sun protection factor. Remarkably, we found that all volunteers sunburned at some point. The risk of sunburn correlated significantly with the adjusted body site-specific UVR dose. Furthermore, there was also a significant relationship between the daily UVR dose...... and percentage of body surface area with sunburn. Our study shows that holiday UVR exposure results in a high risk of sunburn, which potentially increases the risk of skin cancer. Possible protection by melanogenesis is insufficient to protect against sunburn during a 1-week sun holiday. Finally, our data...

  18. Thermographic Inspections And The Residential Conservation Service Program (RCS)

    Science.gov (United States)

    Ward, Ronald J.

    1983-03-01

    Rhode Islanders Saving Energy (RISE) is a non-profit corporation founded in 1977 to provide Rhode Island residents with a variety of energy conservation services. Since January of 1981, it has been performing energy audits in compliance with the Department of Energy's (DOE) Residential Conservation Service Program (RCS). One aspect of the RCS program is the performance of inspections on energy conservation activities completed according to RCS installation guidelines. This paper will describe both the use and results of thermographic inspections within the RISE program. The primary objective of these inspections has been to assure the quality of the building envelope after completion of retrofit measures. Thermal anamolies have been detected that vary in size, location and probable cause. Approximately 37% of all jobs performed through RISE in conjunction with the RCS program have required remedial work as a result of problems that were identi-fied during the thermographic inspection. This percentage was much higher when infra-red inspections were conducted on "Non-RCS" retrofits. Statistics will be presented that provide an interesting insight on the quality of retrofit work when performed in associa-tion with a constant inspection process.

  19. In service inspection of pipes based on risk methods

    International Nuclear Information System (INIS)

    Mendoza G, G.; Viais J, J.; Carmona C, M.

    2006-01-01

    The politics of the Nuclear Regulatory Commission (by its initials in English NRC) of the United States of America on the use of the Probabilistic Safety Analysis (PSA) in activities of nuclear regulation it foments the use of this analysis technique to improve the decisions making, to reduce the unnecessary work in maintenance aspects, inspection and tests and to improve the regulatory efficiency. The inspection programs in service (ISI by its initials in English) developed by the American Society of Mechanical Engineers (by its initials in English ASME) it has been the one primary mechanism to prove the mechanical equipment in plants of nuclear energy, these programs indeed have been carried out in plants of nuclear energy by more of two decades. Their purpose is to identify the conditions, such as indications of cracks that are precursory of flights and ruptures which violate the integrity principles of the pressure frontier. The inspection in service activities include ultrasonic tests, surface tests and penetrating liquids test, also activities that include the scaffolds construction, removal of insulations and welding polishing. The inspections in service every 18 months during the times outside of service are executed. One of the objectives is to lower the costs of the inspections during the times outside of service and to reduce the exposure to the radiation by part of the personnel during these times out for inspections, while it is increased or it maintains the personnel's safety and the reliability. As part of the methodology a pipe segment is selected for which a fault in any point has the same consequences, being calculated the fault probability of the tube using the dimensions of the segment. In this work the inspection in service methodology is applied based on risk to an aspersion system of low pressure of the Laguna Verde Nucleo electric Central. For this system a reduction in the number of welding to inspect of 103 to only 15 is obtained

  20. 76 FR 24713 - Cooperative Inspection Programs: Interstate Shipment of Meat and Poultry Products

    Science.gov (United States)

    2011-05-02

    ... amenable species, such as processing game meat or for busy times in their retail shops around holidays. The... Service 9 CFR Parts 321, 332, and 381 Cooperative Inspection Programs: Interstate Shipment of Meat and... Shipment of Meat and Poultry Products AGENCY: Food Safety and Inspection Service, USDA. ACTION: Final rule...

  1. Laurels for Swiss in-service inspection team

    International Nuclear Information System (INIS)

    Anon.

    1984-01-01

    Following what is believed to be the first successful application of P-scan ultrasonic testing for the in-service inspection of austenitic welds in the boiling water reactor at Wuergassen (Federal Republic of Germany) last year, Sulzer participated in a 'round robin' test organized by the Electric Power Research Institute in the USA form May to July 1983. (Auth.)

  2. Interaction between periodic in-service inspection requirements and design

    International Nuclear Information System (INIS)

    Prot, A.C.; Saglio, R.

    1979-03-01

    After reviewing the requirements specific of periodic In-Service Inspection related to safety problems, especially for the pressure vessels, and taking into account the experience gained with several PWR reactors, the authors show these requirements could lead to modify the primary circuit design

  3. In-service inspection methods for graphite-epoxy structures on commercial transport aircraft

    Science.gov (United States)

    Phelps, M. L.

    1981-01-01

    In-service inspection methods for graphite-epoxy composite structures on commercial transport aircraft are determined. Graphite/epoxy structures, service incurred defects, current inspection practices and concerns of the airline and manufacturers, and other related information were determind by survey. Based on this information, applicable inspection nondestructive inspection methods are evaluated and inspection techniques determined. Technology is developed primarily in eddy current inspection.

  4. Review of activities relevant to in-service inspection

    International Nuclear Information System (INIS)

    Imanaka, N.

    1980-01-01

    Nuclear power plants are requested to provide continuing safety that cannot compare with other industries, as plant safety is a matter of much concern. To provide continuous assurance for plant safety there is increasing tendency to demand much of inspection of components during the lifetime. This inservice inspection of LMFBRs should be investigated from a view point of different systems and characteristics from LWRs. In this paper a review for inservice inspection of LMFBRs is described. To provide a continuous assurance of safety to the LMFBR, it is essential to develop how to construct the components to maintain the integrity throughout the service lifetime. Especially how to design is urged for this object. In-service inspection should be located only to compensate some uncertainty remained at the design stage, as it is too much complex in practice. As for inspection techniques, leak monitoring is assumed to be a best way to assure the plant safety continuously with the minimum plant outage time and minimum radioactive hazard to the inspectors

  5. In service inspection of SUPERPHENIX 1 vessels: MIR

    International Nuclear Information System (INIS)

    Asty, M.; Viard, J.; Lerat, B.; Saglio, R.

    1985-01-01

    Although no in-service inspection constraints were imposed on the Phenix vessels, the Safety Authorities asked that the design of SUPERPHENIX 1 makes it possible to monitor throughout the lifetime of the reactor, surface and internal defects on the main vessel. A pool design and the presence of heat baffles inside the main vessel make access from the inside of the vessel impossible. Thus, an inspection can only be performed from the outside of the main vessel: the distance between the walls of the main and safety vessels is such that an inspection device can be introduced into the corresponding space. As the design of the reactor precludes radiographic inspection, the method which was selected for monitoring internal defects in the main vessel is ultrasonics. However, the anisotropic structure of austenitic stainless steel welds limits the performance of this technique. The authors present the in-service inspection device, MIR, which has been specially developed for the visual and ultrasonic examination of SUPERPHENIX 1 vessels

  6. A sun holiday is a sunburn holiday.

    Science.gov (United States)

    Petersen, Bibi; Thieden, Elisabeth; Philipsen, Peter Alshede; Heydenreich, Jakob; Young, Antony Richard; Wulf, Hans Christian

    2013-08-01

    Many people take holidays in sunny locations with the express aim of sunbathing. This may result in sunburn, which is a risk factor for skin cancer. We investigated 25 Danish sun seekers during a week's holiday in the Canary Islands. The percentage of body surface area with sunburn was determined by daily skin examinations by the same observer. Erythemally effective ultraviolet radiation (UVR) exposure was assessed with time-stamped personal dosimeters worn on the wrist. Volunteers reported their clothing cover and sunscreen use in diaries, and this information was used to determine body site-specific UVR doses after adjustment for sun protection factor. Remarkably, we found that all volunteers sunburned at some point. The risk of sunburn correlated significantly with the adjusted body site-specific UVR dose. Furthermore, there was also a significant relationship between the daily UVR dose and percentage of body surface area with sunburn. Our study shows that holiday UVR exposure results in a high risk of sunburn, which potentially increases the risk of skin cancer. Possible protection by melanogenesis is insufficient to protect against sunburn during a 1-week sun holiday. Finally, our data clearly support a substantial skin cancer risk from sun holidays. © 2013 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.

  7. In-service inspection of nuclear power plants

    International Nuclear Information System (INIS)

    Asty, M.; Saglio, R.

    1984-10-01

    The French Commissariat a l'Energie Atomique (Atomic Energy Commission) developed two new non destructive control techniques, focused ultrasonics and multi-frequency eddy currents, which have been shown to allow a better detection and characterization of defects. We present here some of the in-service inspection devices which have been designed for field application of these techniques on the PWR reactors built by EDF, inspection devices of the PWR steam generator tubing and the now developing specific device for main tank and helicoidal tubing steam generator of Super-Phenix 1 [fr

  8. Remote controlled ultrasonic pre-service and in-service inspections of reactor pressure vessels

    International Nuclear Information System (INIS)

    Mueller, G.

    1990-01-01

    The first mechanised in-service inspection of the reactor pressure vessel on unit one of Eskom's Koeberg nuclear power station has been carried out. Since 1968 a whole range of manipulators to carry out remote controlled ultrasonic inspections of nuclear power station equipment has been developed. The inspection of a reactor pressure vessel using a central mast manipulator is described. 3 figs., 1 ill

  9. American Holidays and Festivals

    Institute of Scientific and Technical Information of China (English)

    冯凌

    2002-01-01

    One of the interesting things to learn about a country is to know different kinds of holidays and festivals its people celebrate(庆祝) and to tell why they celebrate them. Although there are some similarities(相似) between American and Chinese holidays and festivals, there are quite a few differences.

  10. HOLIDAY AS SOCIAL INSTITUTE

    Directory of Open Access Journals (Sweden)

    Galaktionova Nelli Anatolyevna

    2013-05-01

    Full Text Available The article deals with holiday as social institute, stages of its institutionalization, such as emergence of need; formation of general objects and ideology proving them; development of social norms and rules;practical adoption of rules and procedures; establishment sanction system; creation of statuses and role system. On the example of Russian festive tradition the general institutional signs of a holiday are described, it is specified that the majority of holidays are at a stage of cultural symbol search having the behavior code; system of ideas; utilitarian and cultural lines; installations and examples of behavior. Taking into consideration the view of Nelli Galaktionova, we can say, that these principles explain the popularity of the Victory Day Holiday and not stable Russian holiday on the 12-th of June- day of Russia. It is stated that the absence of the ritual prevents the popularity of holiday in society. In the article obvious and latent functions of a holiday as social institute are described - regulatory function, integrative, broadcasting, function of reproduction of the social relations, socializing, educational, guarding, forming the culture, communicative, sociocultural, actable, function of leisure and rest organization, adaptive and compensatory, function of removal of ethical regulations. According to the author of article, the holiday is a basis of formation of national and state and civil identity.

  11. In-service inspection of nuclear power plants

    International Nuclear Information System (INIS)

    1991-01-01

    This Manual is intended to provide more comprehensive considerations on the management, organization, preparation, improvement and implementation of in-service inspection activities and the related surveillance. It also gives illustrative examples of good practices and recommendations from operating and other organizations that are consistent with the requirements and recommendations of the Code and Safety Guides. The Manual is directed primarily towards plant management. This Manual should be used in conjunction with the Code and the Safety Guides, in particular with IAEA Safety Series Nos. 50-C-O, 50-SG-O2, 50-SG-05, 50-SG-07, 50-SG-08 and 50-SG-D1, which contain recommendations of a general character about maintenance activities and radiation protection in an operating power plant, and with the 'Manual on the Maintenance of Systems and Components Important to Safety'. This Manual is divided into four technical sections. The first introduces the purpose, structure and main requirements of the programme. The second section describes constituents of the programme, recommending its scope, scheduling, acceptance standards and documentation of results. The following section goes into details of the inspection programme's contents, such as the selection of components, inspection locations, defect types, applicable techniques and procedures, and the evaluation of results. The last section specifies recommended methods and techniques for inspection, such as visual, ultrasonic, eddy current, magnetic particle and others. This main part of the Manual is complemented by a number of annexes which reproduce actual national examples of established procedures, ISI programme parts, acceptance standards, personnel training programmes, testing techniques and other aspects of in-service inspection, illustrating practical implementation of the recommendations of the Manual

  12. 5 CFR 8301.104 - Additional rules for employees of the Food Safety and Inspection Service.

    Science.gov (United States)

    2010-01-01

    ... Food Safety and Inspection Service. 8301.104 Section 8301.104 Administrative Personnel DEPARTMENT OF....104 Additional rules for employees of the Food Safety and Inspection Service. Any employee of the Food Safety and Inspection Service not otherwise required to obtain approval for outside employment under...

  13. 7 CFR 2.53 - Administrator, Food Safety and Inspection Service.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Administrator, Food Safety and Inspection Service. 2... Secretary for Food Safety § 2.53 Administrator, Food Safety and Inspection Service. (a) Delegations... to the Administrator, Food Safety and Inspection Service: (1) Exercise the functions of the Secretary...

  14. Risk informed in-service inspection and testing in Spain

    International Nuclear Information System (INIS)

    Bros, Juan; Marcelles, Ignacio

    2002-01-01

    The Spanish nuclear regulatory authority, the Consejo de Seguridad Nuclear (CSN), requires the use of codes and standards in force in the country of origin of the plant technology. For this reason, the in-service inspection and testing programs applied at Spanish nuclear power plants basically adhere to the requirements of the ASME XI and ASME OM Codes. It is not surprising that when the earliest developments aimed at drawing up risk informed inservice inspection and testing programs were initiated within the framework of ASME, the Spanish industry should follows such developments very closely. In fact, persons within the Spanish nuclear industry joined different ASME committees involved in the development and approval of the various code cases encompassing these developments. Developments specific to the Spanish nuclear power plants were initiated at a time when the aforementioned reference documentation was in a very advanced stage of development/approval. Two clearly differentiated lines of work got under way: On the one hand, and as regards risk informed in-service testing programs, the American standards were used as the sole reference. In the case of risk informed in-service inspection programs, the Spanish nuclear power plant-owning utilities and the Consejo de Seguridad Nuclear decided to draw up a Spanish guideline that, although using the ASME developments as a reference, would have its own specific characteristics. In relation to the above, and referring to the chronology of the events, the activities performed to date in Spain are described

  15. 77 FR 56552 - Holiday Mobile Shopping Promotion

    Science.gov (United States)

    2012-09-13

    ... POSTAL SERVICE 39 CFR Part 111 Holiday Mobile Shopping Promotion AGENCY: Postal Service \\TM... Postal Service, Domestic Mail Manual (DMM[supreg]) 709.3 to add a new temporary promotion during November... Promotion (``Promotion''), which will take place between November 7, 2012 and November 21, 2012 (``promotion...

  16. 9 CFR 113.6 - Animal and Plant Health Inspection Service testing.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Animal and Plant Health Inspection Service testing. 113.6 Section 113.6 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION... STANDARD REQUIREMENTS Applicability § 113.6 Animal and Plant Health Inspection Service testing. A...

  17. HOLIDAY: THEORETICAL ASPECTS

    Directory of Open Access Journals (Sweden)

    Cheban Yuliia

    2018-01-01

    Full Text Available The right to leave is part of the employee’s legal status. It has every employee who works under an employment contract. Ensuring the employee’s right to leave is guaranteed by the state. At the same time, the term “vacation” is a significant range of different phenomena that have features in different sectors of the economy, including agrarian space, different regions, different production conditions, etc. The foregoing complicates not only the basic definition of the term “vacation”, but also its organizational and accounting support. According to the legislation of Ukraine, the holiday is set by law, collective agreement or employment contract a certain number of calendar days of continuous rest, which are provided to the employee by the employer in a calendar year, with or without payment, with the preservation of the place of work (position by the employee at this time. The citizens of Ukraine, who are in labor relations with enterprises, institutions, organizations irrespective of the forms of ownership, type of activity and branch affiliation, are also entitled to leave, as well as work under an employment contract from an individual. The main features that are inherent to the overwhelming majority of the holidays are the following: the employee’s dismissal from performing labor duties, the preservation of the employee during the period of vacations of the place of work (position, payment. Domestic legislation, together with the scientific achievements of researchers, the concept of “vacation” is identified with the concept of “time”. The main characteristic features of the vacation include the guarantee of vacation by law; scope of leave; periodicity of holidays; definition of the length of leave in legislation; continuity of rest during the holiday period; connection of vacation with work experience; the main purpose of vacation; preservation of the place of work at the time of vacations; saving at the time of

  18. Implementation of in-service inspection program for HANARO

    International Nuclear Information System (INIS)

    Wu, J.S.; Park, Y.C.; Cho, Y.G.; Jun, B.J.

    2001-01-01

    HANARO, a 30 MW multi-purpose research reactor in Korea has been successfully in operation for 6 years since its initial criticality in February 1995. It is mainly used for the research areas including nuclear fuel and material irradiation tests, radioisotope production, neutron beam application, neutron activation analysis and neutron transmutation doping. HANARO was designed to perform for at least 20 years under full power operating condition. It is expected that the actual reactor lifetime will be much more than the design lifetime, due to a safety reassessment based on realistic data, preventive maintenance and appropriate in-service inspections (ISI). Since ageing may affect the overall safety of the reactor facility, it is needed to detect and evaluate the effects on aged components and systems related to safety. During the lifetime of the reactor, structures, systems and components are subjected to environmental conditions of stress, temperature and irradiation that may lead to changes in the material properties and could result in unexpected failures. Evidence of ageing problems appears progressively. A rigorous inspection and visual examination based on a periodic ISI program should be established. It is desirable that the ageing surveillance activities is scheduled as early as possible and continued throughout the operating life of the reactor. An inspection plan for safety related structures, systems and components subjected to the ageing conditions is requested by the regulatory body to assess the safety status of reactor facility. A long-term ISI program for HANARO has been established for safety-related systems and components in the context of the overall reactor ageing management. The objective of this paper is to describe the ISI program and the result of the visual inspection as the first ISI. (orig.)

  19. Study on In-Service Inspection Program and Inspection Technologies for Commercialized Sodium-Cooled Fast Reactor

    International Nuclear Information System (INIS)

    Masato Ando; Shigenobu Kubo; Yoshio Kamishima; Toru Iitsuka

    2006-01-01

    The objective of in-service inspection of a nuclear power plant is to confirm integrity of function of components necessary to safety, and satisfy the needs to protect plant investment and to achieve high plant ability. The sodium-cooled fast reactor, which is designed in the feasibility study on commercialized fast reactor cycle systems in Japan, has two characteristics related to in-service inspection. The first is that all sodium coolant boundary structures have double-wall system. Continuous monitoring of the sodium coolant boundary structures are adopted for inspection. The second characteristic is the steam generator with double-wall-tubes. Volumetric testing is adopted to make sure that one of the tubes can maintain the boundary function in case of the other tube failure. A rational in-service inspection concept was developed taking these features into account. The inspection technologies were developed to implement in-service inspection plan. The under-sodium viewing system consisted of multi ultrasonic scanning transducers, which was used for imaging under-sodium structures. The under-sodium viewing system was mounted on the under-sodium vehicle and delivered to core internals. The prototype of under-sodium viewing system and vehicle were fabricated and performance tests were carried out under water. The laboratory experiments of volumetric testing for double-wall-tubes of steam generator, such as ultrasonic testing and remote-field eddy current testing, were performed and technical feasibility was assessed. (authors)

  20. In service inspection and repair of sodium cooled ASTRID prototype

    Energy Technology Data Exchange (ETDEWEB)

    Baque, F.; Jadot, F. [French Atomic Commission, Cadarache Centre, 13108 Saint Paul lez Durance Cedex, (France); Marlier, R. [AREVA, 10 rue Recamier, 69456 Lyon cedex 06, (France); Saillant, J-F. [AREVA/NDE Solutions, 4 rue Thomas Dumorey, BP 70385, 71109 Chalon sur Saone Cedex, (France); Delalande, V. [EDF R and D, 6, quai Watier, 78400 Chatou, (France)

    2015-07-01

    In the frame of the large R and D work which is performed for the future ASTRID sodium cooled prototype, In Service Inspection and Repair (ISI and R) has been identified as a major issue to be taken into account in order to enlarge the plant safety, to consolidate its availability and to protect the associated investment. After the first part of pre-conceptual design phase (2008-2012), the running second part of pre-conceptual phase (2013-2015) allows to increase the ISI and R tool ability for immersed sodium structures of ASTRID, at about 200 deg. C, on the basis of consolidated specifications and thanks to their qualification through more and more realistic laboratory tests and simulation with CIVA code. ISI and R items are being developed and qualified during a pluri-annual program which mainly deals with the reactor block structures, the primary components and circuit, and the Power Conversion System. It ensures a strong connection between the reactor designers and inspection specialists, as the optimization of inspectability and repairability is looked at: this already induced specific rules for design, in order to shorten and ease the ISI and R operations, which have been merged into RCC-MRx rules. In the frame of increasing technology readiness level with corresponding performance demonstration, this paper presents R and D dealing with the ISI and R items: it highlights the sensor development (both ultrasonic and electromagnetic concepts, compatible with sodium at 200 deg. C), then their applications for ASTRID structure control (under sodium telemetry, imaging and NDE). Activity for repair is also presented (a single laser tool for sodium sweeping, machining and welding), and finally the effort for associated robotic (generic program for ASTRID applications, specific technological tools for sodium medium, tight immersed bell). The main results of testing and simulation are given for telemetry, vision, NDE applications, laser process repair and under sodium

  1. A web environment for inspection service; Un entorno WEB para la inspeccion en servicio

    Energy Technology Data Exchange (ETDEWEB)

    Robles Guemes, N.; Garcia Heras, M.; Cueto-Felgueroso Garcia, C.; Pelaez Gutierrez, J. A.

    2013-07-01

    The in-service inspection fundamental objective is to maintain the structural integrity of structures, systems and components during the life in the installation service. Nuclear power plants are required to implement a Service inspection program in accordance with the established regulation by the Regulatory body.

  2. 78 FR 22151 - Fees for Official Inspection and Official Weighing Services Under the United States Grain...

    Science.gov (United States)

    2013-04-15

    ... Inspection Service (FGIS) with the authority to charge and collect reasonable fees to cover the cost of performing official services. The fees also cover the costs associated with managing the program. After a... associated administrative and supervisory costs. The fees for official inspection and weighing services were...

  3. In-service inspection robot for PFBR main vessel- concept

    Energy Technology Data Exchange (ETDEWEB)

    Rajendran, S; Ramakumar, M S [Bhabha Atomic Research Centre, Mumbai (India). Div. of Remote Handling and Robotics

    1994-12-31

    In-service inspection (ISI) of critical components in a nuclear reactor is one of the foremost and important tasks which reveals the state of health of the system, thereby ensuring the safety of the plant, personnel and environment. Prototype Fast Breeder Reactor (PFBR) is designed as a pool type reactor. A safety vessel is provided in the design which envelopes the main reactor vessel. The ISI of the main vessel is mandatory and will be carried out by a robot which will operate on this annular gap. The design of the robot is such that it can crawl around the vessel and into the gap at the bottom of the vessel relying on friction grip. The mobile robot will carry a CCTV camera and the inspection technique packages into the interspace, position and orient these to carry out the ISI of the main vessel. The paper discusses about the design features of the robot including the gripping mechanism and the crawling sequence to perform ISI of the reactor vessel. 3 figs.

  4. In-service inspection robot for PFBR main vessel- concept

    International Nuclear Information System (INIS)

    Rajendran, S.; Ramakumar, M.S.

    1994-01-01

    In-service inspection (ISI) of critical components in a nuclear reactor is one of the foremost and important tasks which reveals the state of health of the system, thereby ensuring the safety of the plant, personnel and environment. Prototype Fast Breeder Reactor (PFBR) is designed as a pool type reactor. A safety vessel is provided in the design which envelopes the main reactor vessel. The ISI of the main vessel is mandatory and will be carried out by a robot which will operate on this annular gap. The design of the robot is such that it can crawl around the vessel and into the gap at the bottom of the vessel relying on friction grip. The mobile robot will carry a CCTV camera and the inspection technique packages into the interspace, position and orient these to carry out the ISI of the main vessel. The paper discusses about the design features of the robot including the gripping mechanism and the crawling sequence to perform ISI of the reactor vessel. 3 figs

  5. It's a Holiday!!

    Science.gov (United States)

    Ratliff, Michael I.; Mc Shane, Janet M.

    2008-01-01

    This article studies various holiday distributions, the most interesting one being Easter. Gauss' Easter algorithm and Microsoft Excel are used to determine that the Easter distribution can be closely approximated by the convolution of two well-known uniform distributions. (Contains 8 figures.)

  6. When "Holiday Magic" Hurts.

    Science.gov (United States)

    Goldstein, Karen

    2001-01-01

    Claims that religious messages in public school are not acceptable and are hurtful to kids who do not subscribe to the beliefs expressed in those messages. Describes the author's personal experience in helping a teacher transform the script for "Christmas Magic" into the more inclusive "Holiday Magic." (RS)

  7. Surveillance and in-service inspection (SISI) program at FFTF

    International Nuclear Information System (INIS)

    Conrads, T.J.

    1980-01-01

    Assurance of the integrity of the sodium coolant pressure boundaries of the Fast Flux Test Facility systems and components is essential for safe operation. A program has been developed to monitor the integrity of the coolant boundaries and certain plant conditions. Specific equipment and features have been designed into the plant for monitoring. The purpose of SISI is to prevent failures or minimize their consequences through early detection. The program which administers the requirements for monitoring applicable plant conditions whose integrity is necessary to protect public health and safety is known as the Surveillance and In-service Inspection (SISI) Program. The SISI program utilizes a wide range of monitoring techniques to ensure that material degradation or structural deficiencies will not result in the loss of the ability to shut down the reactor, cool the reactor core, or cause the release of radioactive material to the environment

  8. An overview of in-service inspection for nuclear power plants in Japan

    International Nuclear Information System (INIS)

    Takano, Eishiro

    1996-01-01

    In nuclear power stations, for maintaining the safety of machinery and equipment, it is stipulated to carry out periodic inspection. The contents of the periodic inspection and the inspections of important matters are explained. In-service inspection (ISI) is the nondestructive inspection for confirming the soundness of reactor pressure vessels, main pipings, valves and others. The stipulations on the scope and time of the periodic inspection and ISI, the course of introducing ISI into Japan, and the basic way of thinking on ISI are described. Pre-service inspection (PSI) is carried out for the purpose of collecting and recording the initial data for ISI. The range of the objects of nondestructive inspection and leak test and the range of the objects of leak test only are shown. As to nondestructive inspection, the parts to be inspected, the frequency of inspection and the methods of inspection, and the method of leak test are described. As the present state of inspection technology, the automatic ultrasonic flow detectors for reactor vessels, piping welded parts and reactor vessel stud bolts, and the eddy current flaw detector for steam generator tubes are explained. (K.I.)

  9. Integrated inspection of services for people with learning disabilities in Scotland: the way forward?

    Directory of Open Access Journals (Sweden)

    Martin Campbell

    2007-10-01

    Full Text Available Purpose: The article summarises the process and the results of the first, integrated inspection of managed care services for people with learning disabilities in Scotland. The multi-agency model used was developed to be congruent with the existing performance inspection models, used by single agency inspection. The inspection activities and main outcomes are described, and suggestions are made for improvements. Context of case: In 2006 an inspection model was devised to assess the quality of health, social services and education services for people with learning disabilities in one geographical area of Scotland, as a precursor to a programme of inspections nationally. The first joint, integrated inspection of all services for people with learning disabilities in Scotland took place in June 2006, and the report was published in March 2007. This was the first multi-agency inspection of its kind in the UK, and the first to involve carers and people with learning disabilities on the inspection team. Data sources: A number of data sources were used to check existing practice against agreed Quality Outcome indicators. Primary sources of data were social work records, health records, education records, staff surveys, carer surveys, interviews with staff, family carers and people with learning disabilities, and self evaluations completed by the services being inspected. Eleven different domains, each with sub-indicators were investigated. Case description: This paper summarises the process of an integrated, multi-agency inspection, how the inspection activities were conducted and the main findings of this inspection. Practical improvements to the process are suggested, and these may be of use to other services and inspectorates. Conclusions and discussion: The integrated inspection was a qualified success. Most major objectives were achieved. The sharing of data amongst inspection agencies, establishing the level of commitment to integrated inspection

  10. Aspects of the Optimization on the In-Service Inspection

    International Nuclear Information System (INIS)

    Korosec, D.; Vojvodic Tuma, J.

    2002-01-01

    In the present paper, the aspects of optimizing In-Service Inspection (ISI) is discussed. Slovenian Nuclear Safety Administration (SNSA) and its authorized organization for the ISI activities, Institute of Metals and Technologies, are actually permanently involved in the ISI processes of the nuclear power plant (NPP) Krsko. Based on the previous experience on the ISI activities, evaluation of the results and review of the new ISI program, the decision was made to improve recent regulatory and professional practice. That means, the conclusion was made to optimize the evaluation process of the ISI as a process. Traditional criteria, standards and practice gives good fundament for the improvements implementation. Improvements can be done on the way that the more broad knowledge about safety important components of the systems shall bee added to the basic practice. It is necessary to identify conditions of the safety important components, such as realistic stress and fatigue conditions, material properties changes due aging processes, the temperature cycling effects, existing flaws characterization in the light of the previous detection and equipment technique used, assessment of the measurement accuracy on the results etc. In addition to the above mentioned, risk assessment and evaluation of the whole ISI shall be done. To do this it is necessary to made risk evaluation, based on previous structural element probability assessment. Probabilistic risk assessment is important and one of the most powerful tools in the ISI optimization. Some basic work on the filed of the risk informed methods related to the nuclear safety components has been already done. Based on reference documentation, the most important steps in risk informed ISI are discussed: scope definition, consequence evaluation, failure probability estimation, risk evaluation, non-destructive examination method selection and possibilities of implementation, monitoring and feedback. Recent experience on the ISI

  11. Joint inspection of services for people with learning disabilities in Scotland: compliance or commitment?

    Directory of Open Access Journals (Sweden)

    Martin Campbell

    2006-10-01

    Full Text Available Purpose: The article describes the development of a practical model of joint, integrated inspection of managed care services for people with learning disabilities in Scotland. The model will give a reliable measure of the impact services are making to people's lives and the quality of service that individuals are actually receiving. Context of case: At present health, social services and education services for people with learning disabilities in Scotland are inspected separately, by up to nine different agencies. The first joint, integrated inspections of all services for people with learning disabilities in Scotland will take place in 2006. This is the first inspection of its kind in the UK, and the first to involve carers and people with learning disabilities on the inspection team. Data sources: Quality Outcome Indicators were developed in 21 different areas, or domains. Evidence based best practice, and evaluative data from previous inspections were the primary sources of data. Case description: This paper reviews the background and rationale for the integrated, joint inspection process. Strengths and constraints of this approach to inspection are discussed, including the crucial importance of commitment from services and from inspectors, rather than mere compliance with demands. Some guidance on how to fully involve staff, carers and services users in the inspection process is given. Conclusions and discussion: The model will produce data to inform decision-making for managers in integrated services and give services users clear information about how well local needs are being met, what areas need development, and what capacity the organisations have to improve. The model of inspection may be of interest to practitioners in a national and international context. The model will be evaluated, following the first joint inspection.

  12. Examples of in-service inspections and typical maintenance schedule for low-power research reactors

    International Nuclear Information System (INIS)

    Boeck, H.

    1997-01-01

    In-service inspection methods for low-power research reactors are described which have been developed during the past 37 years of the operation of the TRIGA reactor Vienna. Special tools have been developed during this period and their application for maintenance and in-serve inspection is discussed. Two practical in-service inspections at a TRIGA reactor and at a MTR reactor are presented. Further a typical maintenance plan for a TRIGA reactor is listed in the annex. (author)

  13. [Medical services on an inspection ship in the north Atlantic].

    Science.gov (United States)

    Kjaer, A

    1990-10-29

    The Danish Naval Inspection Ships sail in the North Atlantic waters with a doctor on board. The object of this investigation was to illustrate the medical services on board and to elucidate the significance of various factors to predict seeking medical advice. During a period of three months, all of the medical services and certain basic factors were registered. The crew was interviewed about consumption of alcohol and tobacco, previous life at sea and family background. A total of 305 consultations were used by the crew of 72 men. This figure is five times the anticipated figure in general practice. Low rank and low age were predictors for frequent medical consultations. The diagnosis groups of traumata/injuries, dermatological conditions and disease in the nervous system or organs of sense were relatively overrepresented. A series of factors may possibly have influenced the pattern of seeking medical help so that this differs from general practice. It is concluded that the dangerous working environment and poor possibilities for good hygiene are important factors whereas the mental stress is of lesser significance.

  14. 48 CFR 846.470 - Use of commercial organizations for inspections and grading services.

    Science.gov (United States)

    2010-10-01

    ... organizations for inspections and grading services. 846.470 Section 846.470 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS CONTRACT MANAGEMENT QUALITY ASSURANCE Government Contract Quality Assurance 846.470 Use of commercial organizations for inspections and grading services. The contracting...

  15. 9 CFR 352.6 - Denial or withdrawal of inspection service.

    Science.gov (United States)

    2010-01-01

    ... improper means; (4) has knowingly represented that any exotic animal carcass, or exotic animal product, has... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Denial or withdrawal of inspection service. 352.6 Section 352.6 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF...

  16. Improvement of in-service inspection in nuclear power plants

    International Nuclear Information System (INIS)

    2004-07-01

    During the nuclear power plant's (NPPs) operating lifetime, the operating organisation should examine the systems, structures and components (SSCs) for possible deterioration so as to determine whether they are acceptable for continued safe operation or whether remedial measures should be taken. In-service inspection (ISI) provides the systematic framework for these examinations. An effective ISI programme ensures both that the safety of the plant is not adversely affected after the commencement of operation and that the levels of reliability and availability of all plant SSCs remain in accordance with the assumptions and intent of the design and, consequently, a cost effective electricity generation is guaranteed. This report was prepared under one of the IAEA projects, 'Integrated NPP life cycle management including decommissioning'. The main objective of an integrated life cycle management programme is to enable NPPs to compete, without compromising safety, successfully in the changing energy markets throughout their service life and to facilitate life extension and eventual decommissioning through improved engineering, technological, economic and managerial actions. The Technical Working Group on NPP Life Management and other advisory groups nominated by the Member States provide recommendations on high priority needs of Member States in this area. The purpose of this TECDOC is to: discuss and evaluate the status of ISI and its evolution in NPPs of IAEA Member States; discuss and evaluate the criteria for effective ISI and the constitutive elements; discuss and evaluate the implication of the introduction of risk informed ISI (RI-ISI) concepts; generate a common recommendation as to how to benefit from utilising the potential of RI-ISI concepts for further development and, possibly, improvement of ISI effectiveness. The specific concept of this report is to treat the two key issues, i.e. inspection qualification and RI-ISI, and their complementarities, to

  17. Risk informed approach to the in-service inspection activities

    International Nuclear Information System (INIS)

    Korosec, D.; Vojvodic Tuma, J.

    2004-01-01

    In the present paper, the aspects of Risk Informed In-Service Inspection (RI-ISI) are discussed. Slovenian Nuclear Safety Administration (SNSA) and its authorized organization for the ISI activities, Institute of Metals and Technologies (IMT), are actually permanently involved in the ISI processes of the nuclear power plant (NPP) Krsko. Based on the previous experience on the ISI activities, evaluation of the results and review of the existing practice in nuclear world, the activities are started to asses the piping of systems in the light of probability of failure. This is so called Risk Informed approach. By the design established criteria, standards and practice gives good fundaments for the improvements implementation. Improvements can be done on the way that the more broad knowledge about safety important components of the systems shall bee added to the basic practice. It is necessary to identify conditions of the safety important components, such as realistic stress and fatigue conditions, material properties changes due aging processes, the temperature cycling effects, existing flaws characterization in the light of the previous detection and equipment technique used, assessment of the measurement accuracy on the results etc. In addition to this deterministic approach, the principles of risk evaluation methods should be used. NPP Krsko has, as practically majority of NPP's, probabilistic risk assessment (PRA) studies for all safety important systems and components. The methods and results from these studies can be efficiently used to upgrade classical deterministic results, based on which the in-service program as a whole is usually done. In addition to the above mentioned, risk assessment and evaluation of the piping shall be done, which is not covered by the existing PRA analysis. To do this it is necessary to made risk evaluation of the piping segments, based on previous structural element probability assessment. Probabilistic risk assessment is important

  18. Reactor safety through quality assurance and in-service inspection

    International Nuclear Information System (INIS)

    Bush, S.H.

    The quality assurance is discussed of nuclear power plant equipment with respect to the following regulations: section 50 10 CFR - supplement B, section NA-400, ASME - section III and ANSI N-54.2. Quality assurance and reliability are assessed with regard to two aspects: all preoperational functions and all operating stages of the power plant. During the production of nuclear power plant components, increased attention should be devoted to the choice of material, materials testing, production programme and to the production process. During power plant operation, care should be given to periodical in-service inspections which guarantee the plant reliability; defects should immediately be remedied or the power plant shut down. Emphasis is put on the tests of reactor welded joints in compliance with the ASME code. The results of operating tests are used as feedback in the design and testing of the components during production. The probabilities were calculated of the occurrence and elimination of defects during the manufacture and operation of a nuclear reactor. (J.B.)

  19. Crack characterization for in-service inspection planning

    International Nuclear Information System (INIS)

    Waale, J.; Ekstroem, P.

    1995-12-01

    During in-service inspection by non destructive testing the reliability is highly dependent on how the equipment is adjusted to the specific object and to the anticipated crack feature.The crack feature and morphology vary widely between different cracking mechanisms and between material types in which the cracks appear. The major objective of this study was to characterize a number of morphology parameters for common crack mechanism and structure material combinations. Critical morphology parameters are crack orientation, shape, width, surface roughness and branching. The crack parameters were evaluated from failure analyses reported from the nuclear and non-nuclear industry. In addition, a literature review was carried out on crack parameter reports and on failure analysis reports, which were further evaluated. The evaluated crack parameters were plotted and statistically processed in data groups with respect to crack mechanism and material type. The fatigue crack mechanism were classified as mechanical, thermal or corrosion fatigue and stress corrosion crack mechanism as intergranular, transgranular or inter dendritic stress corrosion cracking. Furthermore, some common weld defects were characterized for comparison. The materials were divided into three broad groups, ferritic low alloy steels, stainless steels and nickel base alloys. The results indicate significant differences between crack parameters when comparing data from different crack mechanism/material type combinations. Typical parameter values and scatter were derived for several combinations where the data was sufficient for statistical significance. 10 refs, 105 figs, 14 tabs

  20. Crack characterization for in-service inspection planning

    Energy Technology Data Exchange (ETDEWEB)

    Waale, J [SAQ Inspection Ltd, Stockholm (Sweden); Ekstroem, P [ABB Atom AB, Vaesteraas (Sweden)

    1995-12-01

    During in-service inspection by non destructive testing the reliability is highly dependent on how the equipment is adjusted to the specific object and to the anticipated crack feature.The crack feature and morphology vary widely between different cracking mechanisms and between material types in which the cracks appear. The major objective of this study was to characterize a number of morphology parameters for common crack mechanism and structure material combinations. Critical morphology parameters are crack orientation, shape, width, surface roughness and branching. The crack parameters were evaluated from failure analyses reported from the nuclear and non-nuclear industry. In addition, a literature review was carried out on crack parameter reports and on failure analysis reports, which were further evaluated. The evaluated crack parameters were plotted and statistically processed in data groups with respect to crack mechanism and material type. The fatigue crack mechanism were classified as mechanical, thermal or corrosion fatigue and stress corrosion crack mechanism as intergranular, transgranular or inter dendritic stress corrosion cracking. Furthermore, some common weld defects were characterized for comparison. The materials were divided into three broad groups, ferritic low alloy steels, stainless steels and nickel base alloys. The results indicate significant differences between crack parameters when comparing data from different crack mechanism/material type combinations. Typical parameter values and scatter were derived for several combinations where the data was sufficient for statistical significance. 10 refs, 105 figs, 14 tabs.

  1. Improved in-service inspection program for management of degradation in steam generator tubing

    International Nuclear Information System (INIS)

    Kurtz, R.; Heasler, P.; Muscara, J.

    1992-01-01

    This paper presents an overview of significant results from NRC-sponsored research on steam generator tube integrity and inspection. Burst test results are described along with empirical models to relate flaw geometry and size to tube burst pressure. Results of round robin examinations of a retired-from-service steam generator to determine eddy current inspection reliability are presented. An evaluation and comparison of various sampling plans for in-service inspection of steam generators is discussed. Finally, performance demonstration qualification efforts for eddy current inspection systems are described

  2. Conceptual design of in-service inspection and maintenance for KALIMER

    International Nuclear Information System (INIS)

    Ju, Y. S.; Kim, S. H.; Koo, K. H.; You, B.

    1999-01-01

    In-service inspection and maintenance are very important for the safety and availability of nuclear power plants. The conceptual requirements of in-service inspection and maintenance should be reflected in the earlier design process for the verification of the plant operability and reliability. In this paper the fundamental approaches of the inspection and maintenance for KALIMER are established to ensure the structural integrity and operability for KALIMER. The general strategy and methodology of maintenance and inspection for the reactor system and components are proposed and described for satisfying the intents of the Section XI, Division 3, of ASME code and considering the design characteristics of KALIMER

  3. Scheduling and coordination for in-service inspection of nuclear power plant

    International Nuclear Information System (INIS)

    Li Songbai

    1996-11-01

    Based on the practice and experiences of pre-service and in-service inspections for Daya Bay Nuclear Power Plant (NPP) by Research Institute of Nuclear Power Operation (RINPO) following RSEM code, requirements of utility and actual situation in China, the in-service inspection preparation for organization, techniques and equipment/tooling, materials, personnel and documentation is briefly described. And the scheduling and coordinating consideration for planed in-service inspection activities during NPP outage is emphatically introduced. (2 refs., 4 figs.)

  4. In-service inspection of nuclear power-plant pressure components

    International Nuclear Information System (INIS)

    Lautzenheiser, C.E.

    1976-01-01

    The early light-water-reactor systems for production of commercial power were designed and fabricated in accordance with the codes then being used for fossil-fired power-generating stations with some design changes for increased inspectability during fabrication. Over the past few years, major strides have been made in in-service inspection technology. Work has been under way to determine the reliability of nondestructive testing methods and to develop formal inspection programs throughout the world. The major problems associated with in-service inspection are the scarcity of qualified personnel, the variability in procedures and data recording between inspection agencies, and exposure of inspection personnel to radiation. Further work will be required to more completely mechanize piping inspections to reduce radiation exposure and to standardize inspection procedures, equipment, and certification of personnel. Worldwide attention to the requirements of the American Society of Mechanical Engineers' Boiler and Pressure Vessel Code, the size and integrity of inspection agencies, and efforts such as the development of personnel qualification and certification guides emphasize the importance of in-service inspection to nuclear safety

  5. STRATEGI PEMASARAN PAKET WISATA DI BALI EASY HOLIDAY DENPASAR BALI

    Directory of Open Access Journals (Sweden)

    Erick Kevin Perangin-Angin

    2017-07-01

    Full Text Available This Journal aimed to know the strengths and weaknesses of the internal environment and opportunities as well as threats from the external environment and create strategies and marketing programs that can be applied in the Bali Easy Holiday. The technique data collection using observation, interview, questionnaire, the study of literature and documentation study. Sampling techniques using a purposive sampling. Data analysis techniques using qualitative descriptive analysis and Likert scale analysis. The results of this research are obtaining indicators of strengths and weaknesses of internal environment and the opportunities and threats of weaknesses in Bali Easy Holiday. Bali Easy Holiday gains 16 indicators of strengths and 4 indicators of weaknesses in Bali Easy Holiday. Bali Easy Holiday gains 9 indicators of opportunities 5 indicators of threats in Bali Easy Holiday. Marketing strategies can be applied to Bali Easy Holiday, namely : the creation of strategy and product development, market development strategies, promotion strategy, a strategy of improved human resources, the strategy of market penetration strategies, improvement of the quality of products and services and pricing strategies. This research has some advice for Bali Easy Holiday is to increase the intensity of promotion, provide ease reservations and payments to consumers, renew tour packages, provide affordable rates to customers and formed a marketing division.

  6. Etheostoma brevirostrum (Holiday Darter)

    Science.gov (United States)

    Burkhead, Noel M.

    2015-01-01

    The life history of the Holiday Darter is incompletely known. Only reproductive behavior (Johnston and Shute 1997; Anderson 2009), habitat use, and spawning seasons (Anderson 2009) have been studied. However, based on similarity of life history attributes among snubnose darters (Carney and Burr 1989; Johnston and Haag 1996; Khudamrongsawat et al. 2005), the Holiday darter probably lives 3+ years and matures in the first year. It is likely a benthic omnivore, feeding primarily on chironomid (midge) larvae and other common orders of aquatic insects and occasional microcrustaceans. Spawning occurs from late March to early June, with most activity occurring in April. Based on four females from the Amicalola Creek system, fecundity ranged from 50 to 150 mature eggs, egg sizes ranged from 1.2mm to 1.6mm diameter. The Holiday Darter is an “egg attacher” (sensu Page and Swofford 1984). A spawning female is courted by multiple males, but a dominant (alpha) male aggressively rebuts encroaching males and defends a “roving territory” of the receptive female. The alpha male is the principal spawning partner although satellite males often rush a spawning pair. The receptive female slowly swims along the stream bottom, frequently stopping, apparently to assess substrate attributes, and selects each spawning site where only one or two eggs are spawned. The process is repeated and often covers several meters of stream bottom until the courted female finishes spawning and is abandoned by the alpha male. Water temperatures during spawning in Amicalola Creek and the upper Etowah River ranged 10 to 17° C (Anderson 2009).

  7. Preventing degradation and in-service inspection of NPP steam generator

    International Nuclear Information System (INIS)

    Ding Xunshen

    1999-01-01

    The author describes the degradation of steam generator tubes in initial operating stage of France NPP. The author emphatically presents the preventive measures to tackle degradation and In-service inspection of Daya Bay NPP 1 unit as a guarantee of safety operation, including secondary side water chemistry monitoring and controlling, leakage rate monitoring, eddy-current inspection, mechanical cleaning, cleanliness inspection, foreign objects removal and etc

  8. Improvement and optimization for in-service inspection of M310 nuclear power station

    International Nuclear Information System (INIS)

    Wang Chen; Sun Haitao; Gao Chen; Deng Dong

    2015-01-01

    In-service inspection (ISI) is an important method to ensure the safety of the mechanical equipment in nuclear power stations. According to the in-service inspection experience feedback from the domestic nuclear power stations, the reasonableness of some provisions in the RSE-M code are discussed and the applications of risk-informed in-service inspection (RI-ISI) are introduced, and the advices for the optimization of the ISI of the domestic M310 nuclear power stations are proposed. (authors)

  9. In-service inspections of the reactor cooling system of pressurized water reactors

    International Nuclear Information System (INIS)

    Fuerste, W.; Hohnerlein, G.; Werden, B.

    1982-01-01

    In order to guarantee constant safety of the components of the reactor cooling system, regular in-service inspections are carried out after commissioning of the nuclear power plant. This contribution is concerned with the components of the reactor cooling system, referring to the legal requirements, safety-related purposes and scope of the in-service inspections during the entire period of operation of a nuclear power plant. Reports are made with respect to type, examination intervals, examination technique, results and future development. The functional tests which are carried out within the scope of the in-service inspections are not part of this contribution. (orig.) [de

  10. 7 CFR 51.42 - Charges for inspection services on a contract basis.

    Science.gov (United States)

    2010-01-01

    .... 51.42 Section 51.42 Agriculture Regulations of the Department of Agriculture AGRICULTURAL MARKETING SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE REGULATIONS AND STANDARDS UNDER THE AGRICULTURAL MARKETING ACT OF 1946 FRESH FRUITS, VEGETABLES AND OTHER PRODUCTS 1,2 (INSPECTION...

  11. 48 CFR 52.246-5 - Inspection of Services-Cost-Reimbursement.

    Science.gov (United States)

    2010-10-01

    ...-Cost-Reimbursement. 52.246-5 Section 52.246-5 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.246-5 Inspection of Services—Cost-Reimbursement. As prescribed in 46.305, insert... furnishing of services, when a cost-reimbursement contract is contemplated: Inspection of Services—Cost...

  12. Study on in-service inspection methods for the above-ground oil tanks floors

    Energy Technology Data Exchange (ETDEWEB)

    Min Xiong; Yewei Kang; Mingchun, Lin; Yi Sun [PetroChina Pipeline R and D Center, Langfang (China)

    2009-07-01

    It is very dangerous to the environment when oil tank floors get corrosion or leak during its long-time service. The traditional inspection methods need to shut down a tank and to empty it, then to clean it in order to inspect the floor. Comparing with the traditional methods, the in-service methods can inspect tank floors rapidly without removing product and opening the tank and can save many costs of tank emptying and cleaning. This paper explores three up-to date in-service inspection methods for the oil tank floors which are acoustic emission technology ultrasonic guided wave technology and mobile robot technology. The theoretic foundation and application status of each method is described. The advantage and disadvantage of each in-service detection technology is concluded. At last some proposals are made. (author)

  13. Quality control and in-service inspection technology for hybrid-composite girder bridges.

    Science.gov (United States)

    2014-08-01

    This report describes efforts to develop quality control tools and in-service inspection technologies for the fabrication and construction of Hybrid Composite Beams (HCBs). HCBs are a new bridge technology currently being evaluated by the Missouri De...

  14. Planning and programming of pre-operational and in-service inspections

    International Nuclear Information System (INIS)

    Udaondo, M.S.

    1984-01-01

    After a brief mention of the actual scope of in-service inspection work, conclusions are presented that relate to the preparations for inspections, making use of experience acquired since 1972 at 11 nuclear power plants in Spain which have commissioned such studies from one particular organization, and analyses are given of the advantages to be gained therefrom. Three different aspects of preparations for inspections are considered: (a) man-hour estimates and the duration of in-service inspections; (b) the sequence of action during a pre-operational inspection (assuming a typical functional organization) from definition of the codes of practice and standards applicable up to the issue of the final report and the schedule for distribution of the annual work load to be invested in a typical project, as a result of combining the two previous estimates, and (c) the documentary aspect of preparations for an inspection during a scheduled outage, as related to the various documents to be drawn up and their contents. Reference is made to the general training to be given to the staff in charge of inspection activities so as to provide them with information on, and a perspective of, the in-service inspection jobs required. (author)

  15. New developments in containment in-service inspection requirements

    International Nuclear Information System (INIS)

    Staffiera, J.E.

    1995-01-01

    Section 11 of the ASME Boiler and Pressure Vessel Code contains requirements for inservice inspection of nuclear power plant components. Development of ASME Code requirements for containment inservice inspection was begun in 1977, and in 1979 the first such requirements were published in the form of Code Case N-236. Formal inclusion of these requirements in Section 11 of the ASME Code occurred with publication of Subsection IWE, ''Rules for inservice Inspection of Class MC Components of Nuclear Power Plants,'' in the 1980 Edition, Winter 1981 Addenda. At that time, inspection emphasis on nuclear power construction and operation activities was placed on welds and welding processes associated with steel containments and metallic liners of concrete containments. The need for repair-welding requirements was necessitated by containment design modifications for conditions not considered in several original plant designs. Welds in steel containments and metallic liners of concrete containments have not required significant amounts of repair, however, degradation of base metal in containments has become a major concern. Various degradation mechanisms have been identified as potential causes of damage to containment surfaces, including fatigue, corrosion and material embrittlement due to long-term radiation exposure. As a result of these concerns, and in response to comments generated by the Committee to Review Generic Requirements (CRGR) of the NRC in its review of Subsection IWE, emphasis on weld-based inservice inspection was redirected toward a containment-surface inservice inspection program. Significant changes were made to accommodate this re-emphasis. The majority of these changes were published in the 1992 Edition, with the 1992 Addenda, of Subsection IWE. The NRC Proposed Rulemaking was issued for a 75-day public comment period in January, 1994. This period was extended at the request of nuclear industry organizations to allow for meaningful evaluation

  16. Ombud's Corner: holiday time!

    CERN Multimedia

    Sudeshna Datta-Cockerill

    2014-01-01

    In July and August, the Ombud’s Corner articles will be taking a holiday. They will resume in September. Meanwhile, the respect@CERN campaign continues so please keep on sending us your suggestions.   As announced in the last Bulletin, "We want these initiatives to belong to you. For this reason, we would like to ask you to suggest the messages you would like to see included in the posters. What does a “respectful workplace” mean for you? Send your suggestions to respect@cern.ch – and of course we will reward the authors with exclusively designed Respect@CERN-branded items. So, whether it's respect in relation to interpersonal interactions, noise, safety, the environment or anything else, we look forward to receiving your ideas. Do not hesitate – send that e-mail now!" As a reminder, all previous Ombud's Corners can be accessed in the Ombud's blog.

  17. Official holidays in 2011

    CERN Multimedia

    HR Department

    2011-01-01

    (Application of Article R II 4.39 of the Staff Regulations) Official holidays in 2011 (in addition to the special leave during the annual closure): Saturday 1 January\t(New Year) Friday 22 April\t(Good Friday) Monday 25 April\t(Easter Monday) Sunday 1 May Thursday 2 June\t(Ascension day) Friday 3 June\t(compensation granted for 1 May) Monday 13 June\t(Whit Monday) Thursday 8 September\t(“Jeûne genevois”)  Thursday 22 December\t(compensation granted for 24 December, Christmas Eve) Friday 23 December\t(compensation granted for 25 December, Christmas) Saturday 24 December\t(Christmas Eve) Sunday 25 December\t(Christmas) Thursday 29 December\t(compensation granted for 31 December, New Year’s Eve) Friday 30 December\t(compensation granted for 1 January 2012, New Year) Saturday 31 December\t(New Year’s Eve) Tel. 73903

  18. The energy requirement of holidays and household reduction options

    International Nuclear Information System (INIS)

    Van den Berg, M.; Vringer, K.

    1999-12-01

    Like all consumer products and services, holidays require energy. The aim of this study is to give insight to the energy consumption for holidays of Dutch households and to suggest options to reduce this energy demand. To examine the energy consumption for holidays, nine holiday packages are composed, each representing a large group of Dutch vacationers. The packages describe the destination, means of transport, duration, accommodation and number of vacationers. The average energy requirement for the accommodation and transport for long summer holidays is 12.5 GJ per Dutch household, excluding the energy requirement for food and activities. About 10% of the Dutch households, the ones that travel by plane to their holiday destination, consume 70% of the total amount of energy all households require for holiday purposes. This is mainly due to the distance travelled, rather than to the chosen means of transport. If the travelled distances will be reduced by 50% and all nights are spent in a tent, the average household energy requirement would be 6.1 GJ, a reduction of more than 50%. 36 refs

  19. 50 CFR 260.97 - Conditions for providing fishery products inspection service at official establishments.

    Science.gov (United States)

    2010-10-01

    ... processed foods and/or components thereof; (10) Furnish and provide laundry service, as required by NMFS... inspection service at official establishments. 260.97 Section 260.97 Wildlife and Fisheries NATIONAL MARINE FISHERIES SERVICE, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE PROCESSED FISHERY...

  20. In service inspection for Superphenix vessels development of ultrasonic techniques available at high temperature

    International Nuclear Information System (INIS)

    Gondard, C.

    1983-12-01

    The main and safety vessels of SUPERPHENIX 1 were designed to allow in-service inspections. The remote controlled inspection device MIR was developped for this purpose. The ultrasonic examination has required the development of all new transducers fitted with severe operating conditions prevailing in intervessels interval. A list of problems to be resolved and technological solutions which were found is given. Measurements of acoustical properties on actual probes are compared with theoretical values. It appears that concordance is good and that an in-service inspection using high temperature transducers is possible with a good spatial resolution and signal to noise ratio

  1. Primary School Inspection: A Supporting Service for Education.

    Science.gov (United States)

    Lyons, Raymond F.; Pritchard, Mervyn W.

    The first section of this summary report is directed to an examination of the nature of the functions of inspection in the six countries examined--Algeria, Nigeria, Pakistan, Peru, Venezuela, and Zambia--and consideration of the content of effective monitoring of and advising on the work of teachers and schools. Conditions that make it possible…

  2. In-service inspection program for the NCS-80 reactor pressure vessel

    International Nuclear Information System (INIS)

    Scharge, J.; Wehowsky, P.; Zeibig, H.

    1978-01-01

    The in-service inspection program of reactor pressure vessels is mainly based on the ultra-sonic method, visual checking of inner and outer surfaces as well as pressure and leak tests. The test procedure require a design of the pressure vessel suitable for the test methods and the possibility to remove the pressure vessel internals. For the outside inspection a gap of sufficient width is mandatory. The present status of the ultra-sonic method and of the inner and outer manipulators affords to conduct the in-service inspection program in form of automatic checkings. The in-service inspection program for NCS-80, the Nuclear Container-Ship design of 80,000 shp, is integrated in the refueling periods due to the request for a high availability of the ship and reactor plant

  3. Simulating the service life performance of an inspected group of jacket-type structures

    DEFF Research Database (Denmark)

    Schneider, Ronald; Thöns, Sebastian; Rogge, Andreas

    2017-01-01

    and risk. We intend to adopt this approach to optimize inspection, monitoring and repair activities for offshore wind park support structures. As a first step, we simulate – in analogy to an offshore wind park – the service life performance of an inspected group of jacket-type frames. The performance......A novel method for risk-based optimization of inspection and repair strategies for deteriorating structural systems has recently been proposed. The method defines heuristics at the system level to reduce the number of possible strategies. For each defined strategy, it computes the updated system...... failure probability conditional on simulated inspection and repair histories, and evaluates the associated costs and risk. The expected total service life costs and risk for a strategy are finally determined using Monte Carlo simulation. The optimal strategy minimizes the expected total service life costs...

  4. GIMIS - Integral Solution for the In-Service Inspection Management of Components in NPPs

    International Nuclear Information System (INIS)

    Borovic, Damir; Vukovic, Igor

    2014-01-01

    Performance of in-service testing and inspection of components and systems in nuclear power plants are required in order to maintain the nuclear power plant while in operation and to return the plant to service, following plant outages. GIMIS is comprehensive software that integrates all processes, functions and data related to planning, administrating and executing inspections on systems, structures and components in nuclear power plants. The software is designed as a web application developed using the Microsoft ASP.NET technology, database is a Microsoft SQL, and client is composed of JavaScript frameworks. It can be adapted to local language, regulations, and requirements according to the power plant needs. The application consists of seven interdependent modules, namely: components, equipment, personnel, requirements, inspection planning, inspection execution, and reports. GIMIS deals with component, equipment and personnel management (both internally employed and outsourced), also provides full component history including uploaded documentation, drawings, previous inspection results, and supports various types of requirements. It enables scheduling facilitation using component data and compliance requirements, offers generation of all inspection relevant documentation and reports, and covers the equipment management including calibration requirements, certification of equipment and allocation to specific inspections/outages, as well as personnel certifications and allocation to specific inspections/outages. The paper describes the content and functionality of the GIMIS application and provides information of its built-in capabilities and features. (authors)

  5. Increase plant safety and reduce cost by implementing risk-informed in-service inspection programs

    International Nuclear Information System (INIS)

    Billington, A.; Monette, P.

    2001-01-01

    The idea behind the program is that it is possible to 'inspect less, but inspect better'. In other words, the risk-informed In-Service Inspection (ISI) process is used to improve the effectiveness of examination of piping components, i.e. concentrate inspection resources and enhance inspection strategies on high safety significant locations, and reduce inspection requirements on others. The Westinghouse Owners Group (WOG) risk-informed ISI process has already been applied for full scope (Millstone 3, Surry 1) and limited scope (Beznau, Ringhals 4, Asco, Turkey Point 3). By examining the high safety significant piping segments for the different fluid piping systems, the total piping core damage frequency is reduced. In addition, more than 80% of the risk associated with potential pressure boundary failures is addressed with the WOG risk-informed ISI process, while typically less that 50% of this same risk is addressed by the current inspection programs. The risk-informed ISI processes are used to improve the effectiveness of inspecting safety-significant piping components, to reduce inspection requirements on other piping components, to evaluate improvements to plant availability and enhanced safety measures, including reduction of personnel radiation exposure, and to reduce overall Operation and Maintenance (O and M) costs while maintaining regulatory compliance. A description of the process as well as benefits from past projects is presented, since the methodology is applicable for WWER plant design. (author)

  6. Increase plant safety and reduce cost by implementing risk-informed In-Service Inspection programs

    International Nuclear Information System (INIS)

    Billington, A.; Monette, P.; Doumont, C.

    2000-01-01

    The idea behind the program is that it is possible to 'inspect less, but inspect better'. In other words, the risk-informed In-Service Inspection (ISI) process is used to improve the effectiveness of examination of piping components, i.e. concentrate inspection resources and enhance inspection strategies on high safety significant locations, and reduce inspection requirements on others. The Westinghouse Owners Group (WOG) risk-informed ISI process has already been applied for full scope (Millstone 3, Surry 1) and limited scope (Beznau, Ringhals 4, Asco, Turkey Point 3). By examining the high safety significant piping segments for the different fluid piping systems, the total piping core damage frequency is reduced. In addition, more than 80% of the risk associated with potential pressure boundary failures is addressed with the WOG risk-informed ISI process, while typically less than 50% of this same risk is addressed by the current inspection programs. The risk-informed ISI processes are used: to improve the effectiveness of inspecting safety-significant piping components; to reduce inspection requirements on other piping components; to evaluate improvements to plant availability and enhanced safety measures, including reduction of personnel radiation exposure; and to reduce overall Operation and Maintenance (O and M) costs while maintaining regulatory compliance. A description of the process as well as benefits of past projects is presented, since the methodology is applicable for VVER plant design. (author)

  7. An overview of non destructive inspection services in nuclear power plants

    International Nuclear Information System (INIS)

    Farley, S.

    2004-01-01

    Worldwide nuclear power plants are obliged by international and local authorities to perform periodical inspection and maintenance of safety relevant components. Non-Destructive Testing (NDT) techniques such as eddy current, ultrasonic, visual, dye penetrant and radiographic testing have been used and continually developed to inspect a wide range of components and materials. Inspecting such components invariably poses an interesting chal-lenge due to complex component geometries, radiation exposure and the material make-up of the component or its welds. As a leader in services to the nuclear industry, Westinghouse has an immense knowl-edge and experience in inspecting and repairing primary circuit components such as steam generators, reactor vessels, core internals, primary coolant pumps and loops, fuel elements and many other components in hazardous environments. To fulfil the requirements posed by authorities and inspection standards, remotely operated manipulators and vehicles have been designed to bring a diverse variety of probes and cameras to the object of inspection. Each inspection process is tested and qualified by the relevant qualification body. In some cases the results of an inspection may require further in depth analysis or even repair of part of the component. These added challenges have often been met by specifically designed and qualified processes such as for the repair of vessel head penetrations or the re-pair of vessel nozzle safe end welds. This presentation will give a general overview of a range of inspection capabilities and give a few examples in which repair was successfully performed. (author)

  8. Advanced In-Service Inspection Approaches Applied to the Phenix Fast Breeder Reactor

    International Nuclear Information System (INIS)

    Guidez, J.; Martin, L.; Dupraz, R.

    2006-01-01

    The safety upgrading of the Phenix plant undertaken between 1994 and 1997 involved a vast inspection programme of the reactor, the external storage drum and the secondary sodium circuits in order to meet the requirements of the defence-in-depth safety approach. The three lines of defence were analysed for every safety related component: demonstration of the quality of design and construction, appropriate in-service inspection and controlling the consequences of an accident. The in-service reactor block inspection programme consisted in controlling the core support structures and the high-temperature elements. Despite the fact that limited consideration had been given to inspection constraints during the design stage of the reactor in the 1960's, as compared to more recent reactor projects such as the European Fast Reactor (EFR), all the core support line elements were able to be inspected. The three following main operations are described: Ultrasonic inspection of the upper hangers of the main vessel, using small transducers able to withstand temperatures of 130 deg. C, Inspection of the conical shell supporting the core dia-grid. A specific ultrasonic method and a special implementation technique were used to control the under sodium structure welds, located up to several meters away from the scan surface. Remote inspection of the hot pool structures, particularly the core cover plug after partial sodium drainage of the reactor vessel. Other inspections are also summarized: control of secondary sodium circuit piping, intermediate heat exchangers, primary sodium pumps, steam generator units and external storage drum. The pool type reactor concept, developed in France since the 1960's, presents several favourable safety and operational features. The feedback from the Phenix plant also shows real potential for in-service inspection. The design of future generation IV sodium fast reactors will benefit from the experience acquired from the Phenix plant. (authors)

  9. NDT reliability in the organizational context of service inspection companies

    International Nuclear Information System (INIS)

    Holstein, Ralf; Bertovic, Marija; Kanzler, Daniel; Mueller, Christina

    2014-01-01

    The focus of NDT reliability research in the past was in the field of two high risk industries: (atomic) power plants and aircrafts. The responsible organizations have been well aware of the risks and founded projects to understand and optimize critical steps during production, operation and maintenance. But the use of NDT is not limited to these two fields. The risks during operation of chemical plants, trains or windmills are different from the area above but evident. The coverage by legal regulations is relatively low. Instead of this owner responsibility, product liability and financial issues are the driving forces to do inspections and to use non-destructive testing. The different targets and financial issues influence the practice of NDT-inspections. A survey of this practice and its results are shown. (orig.)

  10. In-Service Inspection system for coolant channels of Indian PHWRS - evolution and experience

    International Nuclear Information System (INIS)

    Puri, R.K.; Singh, M.

    2006-01-01

    In-Service Inspection (ISI) is the most important of all periodic monitoring and surveillance activities for assuring the structural integrity of coolant channels in the life extension and management of pressurized heavy water reactors (PHWR-CANDU). Indian PHWRs (220 MWe) are characterized by consists by 306 coolant channels in each unit. These channels have to be inspected for various parameters over the operating life of the reactor. ISI of coolant channels necessitated the indigenous development of an inspection system called BARCIS (BARC Channel Inspection System) at Bhabha Atomic Research Center. BARCIS consists of mainly three parts; drive and control unit, special sealing plug and an inspection head carrying various NDT sensors. Five such systems have been built and deployed at various power plants. The paper deals with the development of the BARCIS system for meeting the ISI requirements of coolant channels, development cycle of this system from its conception to evolution to the present state, challenges, data generated and experience gained (ISI of nearly 900 coolant channels has been completed). Prior to BARCIS, pressure tube gauging equipment for pre-service inspection of coolant tubes was developed in 1980. Moreover a tool for ISI of coolant channels in dry condition was developed in 1990. The paper also describes evolution of various contingency procedures and devices developed over the last one decade. Future plans taking into account technological advancement, changes in the scope of inspection due to design and operating experiences and plant layout will also be covered. The paper describes the efforts put in to develop drive and control mechanism to suit the different vault layouts. The drive mechanism is responsible for linear and rotary movement of the inspection head to carry out 100% volumetric inspection. Special emphasis has been laid on the safety devices required during the inspection activity. Special measures for heavy water retention in

  11. 40 CFR 23.11 - Holidays.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Holidays. 23.11 Section 23.11... STATUTES § 23.11 Holidays. If the date determined under §§ 23.2 to 23.10 falls on a Federal holiday, then... that is not a Federal holiday. ...

  12. Rethinking the Holidays. Teacher's Resources.

    Science.gov (United States)

    Porter, Priscilla H.

    1993-01-01

    Maintains that holidays provide opportunities for teaching about history and cultural diversity. Presents a bibliographic essay of recommended resources for elementary teachers on this topic. Materials include reading resources, activity books, and audiovisual materials. (CFR)

  13. Holidays Come - Passwords Go

    CERN Multimedia

    Computer Security Team

    2011-01-01

    The holiday season is approaching and with it, the best chance of losing your password!!   If you are keen to access your CERN mailbox or other computing facilities at CERN from the Internet café at your hotel, hold on and think twice. Is that local PC trustworthy? Most likely it is not. It might never have been patched, and, thus, has been infected by plenty of computer viruses long time ago. Worse, nasty people might have installed tools which aim at stealing your password once you type it. Therefore, it is better to use your own laptop or mobile phone for such activities. If you decided to connect to CERN from an untrustworthy computer and had typed in your CERN password there – please seriously consider changing your CERN password at http://cern.ch/account as soon as you have access to a trustworthy computer. However, also take care when using your own laptop or mobile device: wireless communication can be intercepted. Many wireless access points, e.g. at airports, do no...

  14. A risk-informed approach to optimising in-service inspection of piping

    International Nuclear Information System (INIS)

    Billington, A.; Monette, P.

    1999-01-01

    Traditional criteria for the selection of in-service inspection locations in piping, have come to be regarded as being out-of-touch with current knowledge of piping failures and with current measures of safety importance. An alternative , risk-informed, method has been developed and successfully licensed, that systematically establishes an inspection plan addressing all safety-related piping systems, in a way that is optimized with respect to the safety gain achieved through in-service inspection. The principles of the method are discussed and the results of several applications are summarized, all of which demonstrate that the risk-informed program would lead to significant improvements in the overall level of plant safety, while at the same time re-distributing the inspections in such a way that reduces both plant costs and radiation exposure to personnel.(author)

  15. 78 FR 2627 - Fees for Official Inspection and Official Weighing Services Under the United States Grain...

    Science.gov (United States)

    2013-01-14

    ... authority to charge and collect reasonable fees to cover the cost of performing official services. These fees also cover the costs associated with managing the program. After a financial review of GIPSA's Fees for Official Inspection and Weighing Services, including a comparison of the costs and revenues...

  16. 78 FR 63518 - Uranium Enrichment Fuel Cycle Inspection Reports Regarding Louisiana Energy Services, National...

    Science.gov (United States)

    2013-10-24

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 70-3103; NRC-2010-0264] Uranium Enrichment Fuel Cycle Inspection Reports Regarding Louisiana Energy Services, National Enrichment Facility, Eunice, New Mexico... Louisiana Energy Services (LES), LLC, National Enrichment Facility in Eunice, New Mexico, and has authorized...

  17. 77 FR 18272 - Uranium Enrichment Fuel Cycle Facility Inspection Reports Regarding Louisiana Energy Services LLC...

    Science.gov (United States)

    2012-03-27

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 70-3103; NRC-2010-0264] Uranium Enrichment Fuel Cycle Facility Inspection Reports Regarding Louisiana Energy Services LLC, National Enrichment Facility, Eunice... Louisiana Energy Services (LES), LLC, National enrichment Facility in Eunice, New Mexico, and has verified...

  18. 77 FR 65729 - Uranium Enrichment Fuel Cycle Facility Inspection Reports Regarding Louisiana Energy Services LLC...

    Science.gov (United States)

    2012-10-30

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 70-3103; NRC-2010-0264] Uranium Enrichment Fuel Cycle Facility Inspection Reports Regarding Louisiana Energy Services LLC, National Enrichment Facility, Eunice... Services (LES), LLC, National Enrichment Facility in Eunice, New Mexico, and has verified that cascades...

  19. Risk-informed in-service inspections of nuclear power plants: European activities

    International Nuclear Information System (INIS)

    Simola, K.; Gandossi, L.

    2010-01-01

    Risk-informed in-service inspection (RI-ISI) methods aim at enhancing ISI effectiveness by taking into account the risk importance of possible inspection sites. These methods are widely applied in US, but in Europe the situation is different, as there are many regulatory environments implying a variety of ISI codes and standards and national guidelines. The objective of the European Network for Inspection Qualification, ENIQ, is to co-ordinate and to manage at European level expertise and resources for the qualification of non-destructive inspection techniques and procedures primarily for the in-service inspection of nuclear components. ENIQ has established a Task Group on Risk (TGR) to work towards developing best practice for RI-ISI methodologies. TGR has published a European framework document for risk-informed in-service inspection, and the group has been working at producing more detailed recommended practices and discussion documents on several RI-ISI related issues. In addition, TGR has been active in initiating international projects, such as the JRC-OECD/NEA coordinated RI-ISI benchmark exercise (RISMET). This paper describes the activities and publications of TGR to date, and summarises the contents and main results of the RISMET RI-ISI benchmark exercise. (orig.)

  20. Pre-service baseline inspection using x-probe of Oconee replacement steam generators

    International Nuclear Information System (INIS)

    Addario, M.; Shipp, P.; Davis, K.; Fogal, C.

    2003-01-01

    The eddy current method has been the industry standard for inspecting steam generator tubing for many years and the level of sophistication of coil technology has continued to evolve during that time. State of the art array probe systems now employ multiple sensitivity zones in the probe to better detect and characterize defects in an efficient manner. Owners and regulators of nuclear power plants are interested in the most effective and efficient inspection possible. The ultimate goal has been to meet or exceed new and existing regulatory and design requirements by maximizing the quantity and quality of eddy current data collected while minimizing both the time needed to perform the inspection and the radiation exposure. The X-Probe is an example of this new eddy current array technology. Qualified to detect all types of known defects in steam generator tubing, the technology is comprised of a system of probe, data acquisition instrumentation, computer and human interface software. Recently, Duke Power, along with Babcock and Wilcox Canada and the system developer R/D Tech, collaborated to implement this technology in a first of a kind full scale pre-service inspection of replacement steam generators for Duke Power's Oconee nuclear generating station at Babcock and Wilcox Canada's Cambridge plant. The discussion in this paper will briefly describe the X-Probe technology, describe the system required to perform the inspection, present the general results of the inspection and finally draw some comparative benefit conclusions for both pre-service and in-service applications. (author)

  1. Demonstration test of in-service inspection methods

    International Nuclear Information System (INIS)

    Takumi, Kenji

    1987-01-01

    The major objectives of the project are: (1) to demonstrate the reliability of a manual ultrasonic flaw detector and techniques that are used in operating light water reactor plants and (2) to demonstrate the performance and reliability of an automatic ultrasonic flaw detector that is designed to shorten the time required for ISI work and reduce the exposure risk of inspection personnel. The test project consists of three stages. In the first stage, which ended in 1982, defects were added intentionally to a model structure the same in size as a typical 1.1 million kW BWR plant and manual ultrasonic flaw detection tensting was performed. In the second stage, completed in 1984, automatic eddy-current flaw detection testing was carried out for defects in heat transfer piping of a PWP steam generator. In the third stage, which started in 1981 and ended in March 1987, a newly developed automatic ultrasonic flaw detector is applied to testing of defects used for the manual detector performance evaluation. Results have shown that the automatic eddy-current flaw detector under test has an adequately stable performance for practical uses, with a very high reproducibility to permit close inspection of secular deterioration in heat transfer pipes. It has also revealed that both the manual and automatic ultrasonic flaw detectors under test can detect all defects that do not comply with the ASME standards. (Nogami, K.)

  2. Development of in-service inspection system for core support graphite structures in the high temperature engineering test reactor (HTTR)

    Energy Technology Data Exchange (ETDEWEB)

    Sumita, Junya; Hanawa, Satoshi; Kikuchi, Takayuki; Ishihara, Masahiro [Japan Atomic Energy Research Inst., Oarai, Ibaraki (Japan). Oarai Research Establishment

    2003-03-01

    Visual inspection of core support graphite structures using TV camera as in-service inspection and measurement of material characteristics using surveillance test specimens are planned in the High Temperature Engineering Test Reactor (HTTR) to confirm structural integrity of the core support graphite structures. For the visual inspection, in-service inspection system developed from September 1996 to June 1998, and pre-service inspection using the system was carried out. As the result of the pre-service inspection, it was validated that high quality of visual inspection with TV camera can be carried out, and also structural integrity of the core support graphite structures at the initial stage of the HTTR operation was confirmed. (author)

  3. Human reliability impact on in-service inspection

    International Nuclear Information System (INIS)

    Spanner, J.C. Sr.

    1986-01-01

    This paper describes a study conducted to identify, characterize, and evaluate the human reliability aspects of ultrasonic testing/inservice inspection (UT/ISI). Recent measurements of UT/ISI system effectiveness have revealed wide variations in performance; suggesting that insufficient emphasis is being placed on the human reliability aspects of nondestructive examination. It appears that NDE performance can be improved through application of the human factors principles relating to the task, training, procedure, environmental, and individual difference variables. These variables are collectively referred to as performance-shaping factors. A man-machine systems model was developed to describe the UT/ISI process using functional task descriptors. The relative operating characteristic (ROC) analysis method, which is derived from signal detection theory, offers unique attributes for analyzing NDT performance. The results of a limited human factors evaluation conducted in conjunction with a mini-round robin test are also described

  4. Steam generator tubes integrity: In-service-inspection

    International Nuclear Information System (INIS)

    Comby, R.J.

    1997-01-01

    The author's approach to tube integrity is in terms of looking for flaws in tubes. The basis for this approach is that no simple rules can be fixed to adopt a universal inspection methodology because of various concepts related to experience, leak acceptance, leak before break approach, etc. Flaw specific management is probably the most reliable approach as a compromise between safety, availability and economic issues. In that case, NDE capabilities have to be in accordance with information required by structural integrity demonstration. The author discusses the types of probes which can be used to search for flaws in addition to the types of flaws which are being sought, with examples of specific analysis experiences. The author also discusses the issue of a reporting level as it relates to avoiding false calls, classifying faults, and allowing for automation in analysis

  5. The role of the United States Food Safety and Inspection Service after the Chernobyl accident

    International Nuclear Information System (INIS)

    Engel, Ronald E.; Randecker, Victor; Johnson, Wesley

    1989-01-01

    The Food Safety and Inspection Service (FSIS) of the United States Department of Agriculture (USDA) inspects domestic and imported meat and poultry food products to assure the public that they are safe, wholesome, not economically adulterated and properly labeled. The Service also monitors the activities of meat and poultry plants and related activities in allied industries, and establishes standards and approves labels for meat and poultry products. As part of its responsibility, shortly after the Chernobyl accident occurred, FSIS developed a plan to assess this accident's impact on domestically produced and imported meat and poultry

  6. The role of the United States Food Safety and Inspection Service after the Chernobyl accident

    Energy Technology Data Exchange (ETDEWEB)

    Engel, Ronald E; Randecker, Victor; Johnson, Wesley [Food Safety and Inspection Service, United States Department of Agriculture (United States)

    1989-09-01

    The Food Safety and Inspection Service (FSIS) of the United States Department of Agriculture (USDA) inspects domestic and imported meat and poultry food products to assure the public that they are safe, wholesome, not economically adulterated and properly labeled. The Service also monitors the activities of meat and poultry plants and related activities in allied industries, and establishes standards and approves labels for meat and poultry products. As part of its responsibility, shortly after the Chernobyl accident occurred, FSIS developed a plan to assess this accident's impact on domestically produced and imported meat and poultry.

  7. Specialists' meeting on in-service inspection and monitoring of LMFBRs. Summary report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1980-11-01

    The purpose of the meeting sponsored by the IAEA on the recommendation of the International Working Group on Fast Reactors (IWGFR) was attended by participants from France, the Federal Republic of Germany, Italy, Japan, the Netherlands, United Kingdom, United States of America, and two international organizations: CEC and IAEA. The purpose of the meeting was to review and discuss inspection requirements and concepts developed in the IWGFR member countries, development of inspection methods and their application in practical work and to recommend future development. The technical sessions were divided into four topical sessions as follows: General Concepts for In-Service Inspection of the Reactor Plant; Remotely Controlled Inspection Systems; Ultrasonic Test Methods; Miscellaneous Test Methods.

  8. Specialists' meeting on in-service inspection and monitoring of LMFBRs. Summary report

    International Nuclear Information System (INIS)

    1980-11-01

    The purpose of the meeting sponsored by the IAEA on the recommendation of the International Working Group on Fast Reactors (IWGFR) was attended by participants from France, the Federal Republic of Germany, Italy, Japan, the Netherlands, United Kingdom, United States of America, and two international organizations: CEC and IAEA. The purpose of the meeting was to review and discuss inspection requirements and concepts developed in the IWGFR member countries, development of inspection methods and their application in practical work and to recommend future development. The technical sessions were divided into four topical sessions as follows: General Concepts for In-Service Inspection of the Reactor Plant; Remotely Controlled Inspection Systems; Ultrasonic Test Methods; Miscellaneous Test Methods

  9. Super Phenix 1: In-service inspection of main and safety tanks weldments

    International Nuclear Information System (INIS)

    Asty, M.; Vertut, J.; Argous, J.P.

    1980-01-01

    In Service Inspection of the main tank of the Super Phenix 1 reactor is a new demand compared to Phenix: the authorities have asked that surface and internal defects be detected and their evolution monitored in the future. The presence of thermal baffles inside the main tank precludes the access on that side: the distance between the main and safety tanks takes into account the room needed for an In Service Inspection module. An inspection vehicle is presently under development, which includes ultrasonic examination (focussed probes) and visual examination (TV cameras) capabilities. We briefly describe the techniques that have been selected for ultrasonic testing and also for the vehicle and its guidance between the tanks. (author)

  10. Super Phenix 1: In-service inspection of main and safety tanks weldments

    Energy Technology Data Exchange (ETDEWEB)

    Asty, M [DTech/STA, Centre d' Etudes Nucleaires de Saclay (France); Vertut, J [DPR/STEP, Centre d' Etudes Nucleaires de Saclay (France); Argous, J P [DRNR/STRS, Centre d' Etudes Nucleaires de Cadarache (France)

    1980-11-01

    In Service Inspection of the main tank of the Super Phenix 1 reactor is a new demand compared to Phenix: the authorities have asked that surface and internal defects be detected and their evolution monitored in the future. The presence of thermal baffles inside the main tank precludes the access on that side: the distance between the main and safety tanks takes into account the room needed for an In Service Inspection module. An inspection vehicle is presently under development, which includes ultrasonic examination (focussed probes) and visual examination (TV cameras) capabilities. We briefly describe the techniques that have been selected for ultrasonic testing and also for the vehicle and its guidance between the tanks. (author)

  11. Super Phenix 1: in Service inspection of main and safety tanks weldments

    International Nuclear Information System (INIS)

    Asty, Michel; Vertut, Jean; Argous, J.P.

    1980-05-01

    In service inspection of the main tank of the Super Phenix 1 reactor is a new demand as compared to Phenix: the authorities have asked that surface and internal defects could be detected and their evolution monitored in the future. The presence of thermal baffles inside the main tank precludes the access on that side: the distance between the main and safety tanks takes into account the room needed for an In Service Inspection module. An inspection vehicle is presently under development, which includes ultrasonic examination (focussed probes) and visual examination (TV cameras) capabilities. We briefly describe the techniques that have been selected for ultrasonic testing and also for the vehicle and its guidance between the tanks

  12. In-service inspection for nuclear power plants

    International Nuclear Information System (INIS)

    1980-01-01

    The Safety Guides are recommendations issued by the Agency for use by Member States in the context of their own nuclear safety requirements. Design consideration, in-service examination, test requirements, repair and replacement, equipment, methods and techniques and also administrative aspects are given in this issue

  13. Development of data acquisition and processing system for In-service inspection of nuclear power plants

    International Nuclear Information System (INIS)

    Takama, Shinkichi; Kobayashi, Koji; Satoh, Yoshio; Koga, Yoshihiro; Shimizu, Takakazu

    1981-01-01

    In-service inspection (ISI) is required during the plant outage to assure the reliability of the components of a nuclear power plant. IHI has developed the advanced ISI system which consists of remote controlled and mechanized ultrasonic inspection devices for reactor pressure vessel examination, semi-automatic inspection instruments for piping examination with manual scan and automatic recording, data acquisition and processing system with microprocessor and mini-computer. By this system, ISI can be performed fully satisfying the requirement of ASME Code Sec. XI and minimizing operation in the high radioactive areas. All ultrasonic information is processed by the computer and the examination results such as size and location of ultrasonic indication are printed out in the form of sectional and plan view of the part examined, reproduced screen image and polar plot, etc. as well as the evaluation sheet. This system saves the elaborate work of inspection personnel and is expected to contribute to the improvement of inspection quality and to the reduction of radiation exposure of inspection personnel. (author)

  14. Development of Surveillance and In-Service Inspection Programme for Indian Research Reactors Cirus and Dhruva

    International Nuclear Information System (INIS)

    Shukla, D.K.

    2006-01-01

    Many safety requirements for research reactors are quite similar to those of power reactors. For research reactors with a higher hazard potential, the use of safety codes and guides for power reactors is more appropriate. However, there are many important differences between power reactors and research reactors that must be taken into account to ensure that adequate safety margins are available in design and operation of the research reactor. Most research reactors may have small potential for hazard to the public compared to power reactors but may pose a greater potential hazard to the plant operators. The need for greater flexibility in use of research reactors for individual experiments requires a different safety approach. Safety rules for power reactors are required to be substantially modified for application to specific research reactor. Following the intent of the available safety guides for surveillance and In-Service Inspection of Nuclear Power Plants, guidelines were formulated to develop surveillance and In-Service Inspection programme for research reactors Cirus and Dhruva. Based on the specific design of these research reactors, regulatory requirements, the degree of sophistication and experience of the technical organization involved in operating the research reactor, guidelines were evolved for developing and implementing the surveillance and In-Service Inspection programme for research reactors Cirus (40 MWt) and Dhruva (100 MWt) located at Bhabha Atomic Research Centre, Trombay, Mumbai, India. Paper describes the approach adopted for formulation of surveillance and In-service Inspection programme for Dhruva reactor in detail. (author)

  15. 78 FR 23312 - Uranium Enrichment Fuel Cycle Inspection Reports Regarding Louisiana Energy Services, National...

    Science.gov (United States)

    2013-04-18

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 70-3103; NRC-2010-0264] Uranium Enrichment Fuel Cycle Inspection Reports Regarding Louisiana Energy Services, National Enrichment Facility, Eunice, New Mexico..., National Enrichment Facility in Eunice, New Mexico, and has authorized the introduction of uranium...

  16. ASTRID In Service Inspection and Repair: Review of R&D program and associated results

    International Nuclear Information System (INIS)

    Baqué, François; Jadot, Françoise; Bourdais, Florian le; Sibilo, Julien; Augem, Jean-Michel; Gastaldi, Olivier

    2013-01-01

    In Service Inspection & Repair (ISI&R): → range of provisions enabling to verify that the equipments state is in compliance with design criteria; → other range of provisions allowing to characterize an abnormal situation (failure, operation mistake) and to perform necessary actions to reach again an achievable plant configuration

  17. 9 CFR 352.3 - Application by official exotic animal establishment for inspection services.

    Science.gov (United States)

    2010-01-01

    .... (a) Any person desiring to process an exotic animal, exotic animal carcasses, exotic animal meat and... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Application by official exotic animal establishment for inspection services. 352.3 Section 352.3 Animals and Animal Products FOOD SAFETY AND...

  18. 7 CFR 52.83 - Reporting results of the plant survey and inauguration of inspection services.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 2 2010-01-01 2010-01-01 false Reporting results of the plant survey and inauguration... AGRICULTURAL MARKETING SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE REGULATIONS AND STANDARDS UNDER THE AGRICULTURAL MARKETING ACT OF 1946 PROCESSED FRUITS AND VEGETABLES...

  19. Case history of a 94 MVA turbo-generator retired after 190.000 hours of service by defects revealed by boresonic in-service inspection

    International Nuclear Information System (INIS)

    Porro, F.; Santoro, M.

    1990-01-01

    The case-history of a turbogenerator manufactured by Ansaldo on 1957 and turned on operation on 1958 then retired after 30 years of operation, with a total of 190.000 hours of service, by defects revealed trough boresonic inspections, will be presented. The rotor was inspected a first time after 130.000 hours of service and was overbored in order to allow further service operations. After other 60.000 hours of service operation the rotor underwent to a new in-service inspection that showed an unacceptable condition. The rotor, retired from service, has been destined to destructive tests in order to verify non-destructive predictions

  20. U.S. holiday travel

    Science.gov (United States)

    2003-11-01

    The Thanksgiving and Christmas/New Years holiday periods are among the busiest long-distance travel periods of the year. During the 6-day Thanksgiving travel period, the number of long-distance trips (to and from a destination 50 miles or more awa...

  1. Holiday Plants with Toxic Misconceptions

    Directory of Open Access Journals (Sweden)

    Zabrina N. Evens

    2012-12-01

    Full Text Available Several plants are used for their decorative effect during winter holidays. This review explores the toxic reputation and proposed management for exposures to several of those, namely poinsettia (Euphorbia pulcherrima, English holly (Ilex aquifolium, American holly (Ilex opaca,bittersweet (Solanum dulcamara, Jerusalem cherry (Solanum pseudocapsicum, Americanmistletoe (Phoradendron serotinum, and European mistletoe (Viscum album.

  2. MIR: an in-service inspection device for Superphenix 1 vessels

    International Nuclear Information System (INIS)

    Asty, M.; Ceccato, S.; Lerat, B.; Viard, J.

    1986-06-01

    The main and safety vessels of SUPERPHENIX 1 were designed to allow in-service inspections. The remote controlled inspection device MIR was developed for this purpose. It allows both visual and ultrasonic examinations to be performed. Basically, MIR consists of a tetrahedral structure provided with four steering and traction wheels, two for each vessel. A computer assisted control system enables it to be driven to any position on either the main or safety vessels. Operating conditions are briefly reviewed and the main features of MIR presented

  3. Experience on implementing risk-oriented in-service inspection at NPP in USA

    International Nuclear Information System (INIS)

    Grebenyuk, Yu.P.; Zaritskij, N.S.; Kovyrshin, V.G.; Kostenko, S.P.

    2001-01-01

    Experience of implementing risk-oriented in-service inspection (RIISI) of pipelines at the US NPP analyzed. RIISI processes according to the methodologies developed by Westinghouse and EPRI are described and compared. The information is addressed concerning practical matters of RIISI implementing at NPP Beaver Valley and Arkansas Nuclear One. Regulatory activity of the US NRC while implementing NRC at the US NPP. It is shown that using RIISI at NPP is aimed at improvement of examination efficiency, decreasing costs and occupational dose loads while inspecting pipelines

  4. Review of In-Service Inspection and Repair Technique Developments for French Liquid Metal Fast Reactors

    International Nuclear Information System (INIS)

    Baque, F.

    2005-01-01

    In-service monitoring of nuclear plants is indispensable for both the Operator and the Regulator. The notion of in-service monitoring ranges from the continuous monitoring of the reactor in operation to the thorough in-service reactor inspection during programmed shutdowns. However, the highly specific environment found in French liquid metal fast reactor plants - Phenix and Superphenix - makes monitoring and inspection complicated because of the use of a sodium coolant that is hot, opaque, and difficult to drain.The Commissariat a l'Energie Atomique, in collaboration with its traditional French partners, Electricite de France utilities and FRAMATOME/Novatome Engineering, decided to conduct a 6-yr research and development program (1994-2000) to explore this problem vis-a-vis Superphenix, as well as the possibilities of intervening within the reactor block or on components in a sodium environment. Furthermore, the safety reevaluation of Phenix, conducted between 1994 and 2003, represented an excellent 'test bench' during which the limits of inspection processes - applied to an integrated reactor concept - were surpassed using techniques such as fuel subassembly head scanning, ultrasonic examination of the core support, and visual inspection of the cover-gas plenum following a partial sodium draining. Repair techniques were investigated for cleaning of sodium wet structure surfaces, cutting of damaged parts, and welding in sodium aerosol atmosphere. Both conventional and laser processes were tested

  5. FREE HOLIDAY!%免费度假

    Institute of Scientific and Technical Information of China (English)

    2012-01-01

    Would you like to go on holiday for free? Tommy Frankenburg, from Nottingham, recently bought a (:1,200 package holiday to Malta for himself and his girlfriend. But before they went away together, she broke up with him. So, the heartbroken 22-year-old decided to give the holiday away on the Intemet.

  6. Views towards China's New Arrangement of Holidays

    Institute of Scientific and Technical Information of China (English)

    2007-01-01

    @@ Paid holidays are the basic welfare for workers,while the Golden Week is the national public holiday in China, neither of which could be easily omitted. In addition, traditional festivals couldn't be ignored any more. Discussions on this fantastic topic- "holiday"turn white hot recently.

  7. Inspection Database

    Data.gov (United States)

    U.S. Department of Health & Human Services — FDA is disclosing the final inspection classification for inspections related to currently marketed FDA-regulated products. The disclosure of this information is not...

  8. QUALITY MANAGEMENT IN EDUCATIONAL INSPECTION SERVICES: ADAPTATION TO THE EFQM EXCELLENCE MODEL

    Directory of Open Access Journals (Sweden)

    Alberto José Hontañón Talledo

    2014-12-01

    Full Text Available The main purpose of this project work is to facilitate reflection on the incorporation of rigurous data gathering oriented to the decision making in order to improve the procedure carried out by the Educational Inspection Services, its operation and its results. By my understanding, due to their direct connection with the improvement in teaching practice, this improvement will thereupon result in significant benefits to education, the educational system and society itself. Throughout the project work, an approach to quality management is applied to improve the impact of the actions carried out by the Educational Inspection Services and a practical proposal, which sets out to encourage reflection in order to bent on change, is achieved together with a continuous improvement in the school supervision services themselves.

  9. Research and development on in-service inspection system for reactor vessel of FBR's

    International Nuclear Information System (INIS)

    Rindo, Hiroshi; Mitabe, Noriaki; Ara, Kuniaki; Nagai, Keiichi; Otaka, Masahiko

    1993-01-01

    In-Service Inspection (ISI) is required for main components and piping of FBRs. Visual test and volumetric examination of the reactor vessel (RV) from the outer surface are to be performed under severe conditions such as limited space, high temperature and high gamma dose rate during the reactor shutdown. Therefore, ISI should be performed by using a remote operation system, and the ISI system should be very compact. PNC has been developing the ISI system to apply to the RV inspection. Verification and performance tests of ISI system were carried out by use of the RV test model. This paper describes the system structure, system verification tests including operation and controlling the inspection robot, the functions of the visual test and the volumetric examination under the high temperature

  10. Beliefs concerning the reliability of nuclear power plant in-service inspections

    International Nuclear Information System (INIS)

    Kettunen, J.

    1997-01-01

    The aim of the study was to investigate belief systems held by the officials responsible for the planning and supervision of NDT operations within the Finnish nuclear industry. They were asked to express their opinions on (1) the reliability of NDT methods in general, (2) the factors influencing the reliability of in-service inspections, and (3) the degree of reliability of the current inspections operations conducted by means of NDT methods in the Finnish nuclear power plants. Another goal of the study was to assess the adequacy of officials' beliefs (or belief systems). The research data was collected by interviewing representatives from Finnish power companies (Imatran Voima Oy and Teollisuuden Voima Oy), independent inspection organisations, and the Finnish Centre for Radiation and Nuclear Safety (STUK). The adequacy of the beliefs expressed was assessed by means of the results obtained from international NDT reliability studies and on the basis of interviewees' own justification. (refs.)

  11. Experience with the WWER-440 MW reactor pressure vessel in-service inspections and evaluation of their results

    International Nuclear Information System (INIS)

    Brumovsky, M.; Kralovec, J.; Prepechal, J.; Sulc, J.

    1989-01-01

    The Power Machinery Plant of Skoda Works in Plzen carries out in-service inspections of WWER-440 MW reactor pressure vessels by means of remote controlled inspection equipment - the TRC reactor test system, and some other inspections devices. The results of the in-service inspections were evaluated by methods based on the fracture mechanics approach, the knowledge of stress and strain distribution, and the operating history of the pressure vessels. Examples of types of defects found and their analysis are shown. (author). 1 tab

  12. In-service inspection as an aid to steel pressure vessel reliability

    International Nuclear Information System (INIS)

    Nichols, R.W.

    1975-01-01

    In-service inspection has played an important role in non-nuclear pressure vessel technology, being a legal requirement in many countries. Evidence from surveys of reliability of non-nuclear plant has suggested that such inspections can be effective in reducing the risk of subsequent failures. Recent requirements of the ASME XI code which will be summarised have important implications on the techniques to be used for in-service inspection, and so on design and fabrication aspects. Moreover, in-service inspection can only be an effective procedure if its possible weaknesses are recognised. The first problem is to ensure that an ultrasonic technique is used which is capable of detecting defects of an order of magnitude smaller than the critical size for each particular situation, in whatever defect orientation is important. The potential of different ultrasonic techniques will be compared. Next it is necessary to ensure coverage of all the relevant material. In this respect machine operation is superior to manual scanning, so that manipulation and scanning devices have to be developed. Problems of local geometry and of deviations in geometry have to be discussed with designer and fabricator; plate and clad quality have to be controlled (with respect to surface contour, metallurgical condition and freedom from interfering defects) to ensure inspectability in depth. The reliability of the mechanical and electronic equipment has to be assessed and designed to meet high requirements. Some presentational aids to detection and interpretation will be discussed. Having located a potential defect, the application of fracture mechanics treatments requires knowledge of size, shape and orientation. Some of the problems will be discussed together with possible solutions. (author)

  13. Qualification of UT methods and systems used for in-service inspections of VVER 440 vessels

    International Nuclear Information System (INIS)

    Skala, Z.; Vit, J.

    2003-01-01

    SKODA JS has been performing automated in-service inspections VVER reactor pressure vessels for more than twenty years. All of these inspections were performed by ultrasonic pulse echo method, combined from 1996 with eddy current testing. The Time of Flight Diffraction Method (TOFD) is one of modern methods of ultrasonic testing. The accuracy of sizing the through wall extent of a flaw by TOFD is much better than the accuracy achievable by the pulse echo method. A series of laboratory tests were performed by SKODA JS and confirmed the suitability of TOFD method for VVER reactor parts testing. The Czech Atomic law demands the qualification of systems and methods used for the in-service inspections of nuclear reactors. The qualification is done in accordance with ENIQ methodology and consists of preparation of the Technical Justification and practical tests made under the surveillance of Qualification Body. SKODA JS intends to qualify systems and methods used for the automated ultrasonic testing of VVER 440 and VVER 1000 reactor components from the inner as well as from the outer surface. The accuracy of the flaw through wall extent sizing by TOFD was confirmed by the qualification of methods and systems used for the testing of VVER 440 vessel circumferential weld and so the TOFD method shall be used routinely by SKODA JS for the inspection of vessel circumferential welds root area and for sizing of flaws exceeding the acceptance level. (author)

  14. Wireless Roadside Inspection Phase II Tennessee Commercial Mobile Radio Services Pilot Test Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Franzese, Oscar [ORNL; Lascurain, Mary Beth [ORNL; Capps, Gary J [ORNL; Siekmann, Adam [ORNL

    2011-05-01

    The Federal Motor Carrier Safety Administration (FMCSA) Wireless Roadside Inspection (WRI) Program is researching the feasibility and value of electronically assessing truck and bus driver and vehicle safety at least 25 times more often than is possible using only roadside physical inspections. The WRI program is evaluating the potential benefits to both the motor carrier industry and to government. These potential benefits include reduction in accidents, fatalities and injuries on our highways and keeping safe and legal drivers and vehicles moving on the highways. WRI Pilot tests were conducted to prototype, test and demonstrate the feasibility and benefits of electronically collecting safety data message sets from in-service commercial vehicles and performing wireless roadside inspections using three different communication methods. This report summarizes the design, conduct and results of the Tennessee CMRS WRI Pilot Test. The purpose of this Pilot test was to demonstrate the implementation of commercial mobile radio services to electronically request and collect safety data message sets from a limited number of commercial vehicles operating in Tennessee. The results of this test have been used in conjunction with the results of the complimentary pilot tests to support an overall assessment of the feasibility and benefits of WRI in enhancing motor carrier safety (reduction in accidents) due to increased compliance (change in motor carrier and driver behavior) caused by conducting frequent safety inspections electronically, at highway speeds, without delay or need to divert into a weigh station

  15. Extra holiday because of ionising radiation not necessary

    International Nuclear Information System (INIS)

    Anon.

    1978-01-01

    The 'regulations for special measures to protect employees working with X-rays and radium radiation' of 21st November 1947, which included a statutory six-week holiday period annually, has now been superceded by 'regulations on special protective measures for work with ionising radiation', issued by the Directorate for Work Inspection on 31st March 1978, effective from 1st May 1978. In addition to removing the requirement for six weeks annual holiday for radiation personnel, routine medical surveillance is only required every third year instead of annually. A number of other changes are mentioned. The basis for these changes is that continuous personnel dosimetry and better knowledge of the effects of ionising radiation allows any necessary measures to be taken on the basis of these. (JIW)

  16. IAEA-RCA training course on in-service inspection of research reactors

    International Nuclear Information System (INIS)

    2002-01-01

    Bhabha Atomic Research Centre (BARC) has acquired a wide range of experience for over four decades in design, construction, operation and maintenance of research reactors. The two-week training course on In-Service Inspection of Research Reactors (ISI) has greatly increased the awareness in the field of ISI of Research Reactors. The training course has been formulated so as to cover most of the topics relevant to ISI of research reactors. Important topics such as rationale for in-service inspection, material degradation mechanisms, non-destructive examination techniques, design evaluation of flaws and radiological, codal and regulatory aspects of ISI for research reactors were covered. Lectures on ISI of elastomeric materials and concrete structures, which are generally used in the construction of reactors have also been included in the course. Papers relevant to INIS are indexed separately

  17. Qualification of NDT systems for in-service inspections of nuclear power plant pressure vessels

    International Nuclear Information System (INIS)

    Elfving, K.

    1998-11-01

    The goal of this study is to determine the requirements of the in-service inspection qualification in Europe, their feasibility in practice and to find out possible manufacture defects in test pieces used in practical trials. The literature study consists of qualification requirements set by European regulatory bodies and by the European nuclear power utilities. Also a brief summary of qualification requirements set by ASME Code, Section XI and comparison between ASME and European qualification requirements is included

  18. Laboratory services series: an electrical outlet and corded equipment inspection program

    International Nuclear Information System (INIS)

    Davis, E.A.

    1976-04-01

    A research and development laboratory has thousands of electrical outlets providing power to laboratories, offices, shops, and service areas. These outlets provide power for a wide variety of portable equipment and tools that are equipped with cord and plug. Electric safety requires a periodic check of outlet grounding capability and continuing inspection and repair of corded equipment. Personnel, equipment, reports, procedures, and schedule requirements are reported

  19. Investigation of in service inspection for pressure vessel of the 200 MW nuclear heating reactor

    International Nuclear Information System (INIS)

    He Shuyan; Yin Ming; Liu Junjie; Chang Huanjian; Zhou Ningning

    1997-01-01

    The Nuclear District Heating Reactor (NHR) is a new type of reactor. There are some differences in the arrangement of the primary circuit components and in safety features between NHR and PWR or other reactors. In this paper the safety features of the 200 MW NHR are described. The failure probability, the LBB property and the in-service inspection requirement for the 200 MW NHR pressure vessel are also discussed. (author). 16 refs, 6 figs, 4 tabs

  20. In-service inspection of fertilizer and steel and ship building industries

    International Nuclear Information System (INIS)

    Sanaullah, Md.

    1998-01-01

    There is a good number of fertilizer factories, and steel and ship building industries in Bangladesh. Different NDT methods are being used for in-service inspection of these industries to ensure product reliability, to prevent accident and save human life, to maintain a uniform quality level, to lower manufacturing cost and to minimize the wastage of time and materials and for other benefits. (author)

  1. Investigation of in service inspection for pressure vessel of the 200 MW nuclear heating reactor

    Energy Technology Data Exchange (ETDEWEB)

    Shuyan, He; Ming, Yin; Junjie, Liu; Huanjian, Chang; Ningning, Zhou [Institute of Nuclear Energy and Technology, Tsingua Univ., Beijing (China)

    1997-09-01

    The Nuclear District Heating Reactor (NHR) is a new type of reactor. There are some differences in the arrangement of the primary circuit components and in safety features between NHR and PWR or other reactors. In this paper the safety features of the 200 MW NHR are described. The failure probability, the LBB property and the in-service inspection requirement for the 200 MW NHR pressure vessel are also discussed. (author). 16 refs, 6 figs, 4 tabs.

  2. Study on in-service visual inspection using TV camera for core support graphite components in the HTTR

    International Nuclear Information System (INIS)

    Ishihara, Masahiro; Shibata, Taiju; Kikuchi, Takayuki; Mogi, Haruyoshi

    1999-01-01

    To maintain the structural integrity of graphite components during plant operation a visual inspection using a TV camera as an in-service inspection is planned in the High Temperature Engineering Test Reactor. In order to verify the in-service inspection method a preliminary analytical and experimental studies were performed. In the analytical study the harmful flaw size was determined from a viewpoint of structural integrity based on the fracture mechanics approach. Furthermore, the visible flaw size was determined by the TV camera performance test with graphite test specimens having several kinds of artificial flaws. This paper presents the analytical result on the harmful flaw size and the experimental result on the visible flaw size. From both results the applicability on the visual inspection by the TV camera as the in-service inspection is discussed in this paper. (author)

  3. Study and discussion on management of nuclear island in-service inspection procedure system in nuclear power plant

    International Nuclear Information System (INIS)

    Zhang Xueliang; Fan Yancheng

    2014-01-01

    In-service inspection of nuclear island is the important way for keeping safety operation of nuclear power plant. Taking Daya Bay Nuclear Power Plant as example, the management problems of in-service inspection system was studied and discussed from the angle of references, contents, classifications etc. Based on comparison with French practice, some points of view on perfection of in-service inspection system and improvement of management ability under future multi-bases and multi-units management mode were presented. (authors)

  4. Nuclear containment systems and in-service inspection status of Korea nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Jihong, Park; Jaekeun, Hong; Banuk, Park [Korea Institute of Machinery and Materials, Dept. of Authorized Test and Evaluation, Kyungnam (Korea, Republic of)

    2007-07-01

    20 unit nuclear power plants in Korea have been operated and maintained since the first unit started in commercial service in 1978. Most recently 4 units were under construction and several units were planned to be constructed. by industries. 4 types of nuclear containment systems have been constructed until now: first, metal containments, then pre-stressed concrete containments with grouted tendon systems, followed by pre-stressed concrete containments with un-grouted tendon systems, and Korea standard nuclear containments. All the nuclear containments should be inspected periodically. Therefore for periodic in-service inspection, several appropriate technical requirements should be applied differently depending on the specific nuclear containment types. With the changes of times, nuclear containment systems have undergone a remarkable change, and finally nuclear containment system of Korea standard nuclear power plant was settled down, and as a matter of course it dominates the trend of present and future nuclear containment systems. Overall in-service inspection results of most Korea nuclear containments have not showed any serious evidence of degradation.

  5. In-service inspection of ET-RR-1 reactor vessels and spent fuel storage tank

    International Nuclear Information System (INIS)

    Khattab, M.; Shafy, M.; Konoplev, K.; Samodurve, YU.; Orlov, S.; Didenko, V.; Jackorev, O.

    1993-01-01

    Technical survey included in-service inspection are needed in order to investigate the structural integrity and to insure safe operation of the ET-R R-1 reactor after thirty years aging. An intensive work for the inspection of the inspection of the central tank, shield tank, horizontal channels, primary coolant circuit and spent fuel storage tank have been carried out. The inspection procedures were visual method using video camera and magnification optical as well as thickness measurements using ultrasonic gauge meter and replica for determining defect depth. Water chemical analysis of the primary cooling circuit and spent fuel storage were helpful in results explanation. The results showed that the reactor vessels have good surface conditions. The observed pitting did not affect the structural integrity. The majority of the defects were pits having maximum surface area of about 50 mm. Their depth does not exceed 2 mm. The pits depth rate penetration is of the order of 0.5% per year. Thickness measurements showed insignificant variation. Water status and its chemical properties are very important in controlling corrosion rate. 18 figs., 14 tabs

  6. Automation and mechanization of in-service inspection of selected equipment in FRG's nuclear power plants

    International Nuclear Information System (INIS)

    Metke, E.

    1988-01-01

    The procedures and equipment are described for the automation and mechanization of in-service inspection in nuclear power plants in the FRG, used by the KWU company. Checks of the pressure vessel are done by visual means using a colour tv camera, the method of eddy currents and the ultrasonic method. An analysis is made of the time schedule of ultrasonic inspections, and the central column manipulator is described which allows to check all internal regions of the pressure vessel. Attention is also devoted to other devices, e.g., those for prestressing shanks, cleaning shanks, cleaning thread apertures, etc. A combined probe using the ultrasonic method and the eddy current method serves the inspection of heat exchange tubes in the steam generator. For inspecting the primary circuit the KWU company uses devices for checking and working the inner surface of pipes. Briefly described are examples of using KWU equipment in nuclear power plants in CMEA countries. (Z.M.). 11 figs., 6 refs

  7. Conceptual design and assessment of in-service inspection and maintenance of KALIMER

    Energy Technology Data Exchange (ETDEWEB)

    Joo, Young Sang; Kim, Seok Hun; Kim, Jong Bum; Lee, Jae Han [Korea Atomic Energy Research Institute, Taejeon (Korea)

    2002-05-01

    In the conceptual design stage of KALIMER, the philosophy and methodology of in-service inspection (ISI) and maintenance for the reactor system and components are proposed and described. The ISI and maintenance should be carried out throughout plant life to ensure the structural integrity and safety of KALIMER. The conceptual design of ISI and maintenance are performed for considering the design characteristics of KALIMER and the intents of the ASME XI Division 3. This report describes and summarizes the requirements and available methods of ISI and maintenance. The visual inspection and continuous monitoring play a great role in the in-service inspection of KALIMER. The major structures of KALIMER reactor system are designed for maintenance free operation for the plant life time and the maintenance philosophy is to replace major components rather than repair them. The assessment of the ISI accessibility and maintainability is performed and reviewed each major component. The postulated failure defects for each component are estimated and evaluated for KALIMER safety and reliability. 8 refs., 16 figs., 13 tabs. (Author)

  8. ASME section XI - design and access requirements for in-service inspection

    International Nuclear Information System (INIS)

    Davis, D.D.

    1982-01-01

    The Owner of a nuclear power plant has the regulatory commitment to perform Section XI in-service inspection throughout the service life of a plant. In anticipation of what will be needed to perform adequately the required examinations and tests, sub-article IWA-1500 of Section XI not only requires that sufficient access be provided to accommodate equipment and inspection personnel but also requires that other provisions be considered such as: component surface preparations, material selections, shielding, removal and storage of hardware, handling equipment, and provisions for repairs and replacements. It is, therefore, the owner's and the architect engineer's responsibility to ensure that proper design and access provisions are incorporated to enable the owner to meet his commitments. Since the architect engineer usually has the prime responsibility for the implementation of design criteria, the owner must ensure that these provisions be considered in each phase of design and construction. The benefits of this can result in shorter outages, more meaningful examinations and tests and less radiation exposure of inspection personnel. This paper will address in detail those topics that affect design and access provisions which need to be considered during the design and construction of a nuclear power plant. (author)

  9. The computer vision in the service of safety and reliability in steam generators inspection services

    International Nuclear Information System (INIS)

    Pineiro Fernandez, P.; Garcia Bueno, A.; Cabrera Jordan, E.

    2012-01-01

    The actual computational vision has matured very quickly in the last ten years by facilitating new developments in various areas of nuclear application allowing to automate and simplify processes and tasks, instead or in collaboration with the people and equipment efficiently. The current computer vision (more appropriate than the artificial vision concept) provides great possibilities of also improving in terms of the reliability and safety of NPPS inspection systems.

  10. Application of risk-informed methods to in-service piping inspection in Framatome type nuclear power plants

    International Nuclear Information System (INIS)

    Kim, Jin Hoi; Lee, Jeong Seok; Yun, Eun Sub

    2014-01-01

    The Pressurized water reactor owners group (PWROG) developed and applied a risk-informed in-service inspection (RI-ISI) program, as an alternative to the existing ASME Section XI sampling inspection method. The RI-ISI programs enhance overall safety by focusing inspections of piping at high safety significance (HSS) locations where failure mechanisms are likely to be present. Additionally, the RI-ISI program can reduce nondestructive evaluation (NDE) exams, man-rem exposure for inspectors, and inspection time, among other benefits. The RI-ISI method of in-service piping inspection was applied to 3 units (KSNPs: Korea standard nuclear power plants) and is being deployed to the other units. In this paper, the results of RI-ISI for a Framatome type (France CPI) nuclear power plant are presented. It was concluded that application of RI-ISI to the plant could enhance and maintain plant safety, as well as provide the benefits of greater reliability.

  11. The influence of frequency and reliability of in-service inspection on reactor pressure vessel disruptive failure probability

    International Nuclear Information System (INIS)

    Jordan, G.M.

    1978-01-01

    A simple probabilistic methodology is used to investigate the benefit, in terms of reduction of disruptive failure probability, which comes from the application of periodic in-service inspection to nuclear pressure vessels. The analysis indicates the strong interaction between inspection benefit and the intrinsic quality of the structure. In order to quantify the inspection benefit, assumptions are made which allow the quality to be characterised in terms of the parameters governing a log normal distribution of time - to - failure. Using these assumptions, it is shown that the overall benefit of in-service inspection unlikely to exceed an order of magnitude in terms of reduction of disruptive failure probability. The method is extended to evaluate the effect of the periodicity and reliability of the inspection process itself. (author)

  12. Development of a risk-based in-service inspection program for an LMR

    International Nuclear Information System (INIS)

    King, R.W.; Buschman, H.W.

    1996-01-01

    The emerging application of risk-based assessment technology to the operation and maintenance of nuclear power plants holds considerable promise for improving efficiency and reducing operating costs. Experimental Breeder Reactor II (EBR-II) is a liquid-metal-cooled fast reactor (LMR) that operated for 30 yr before shutting down in September 1994 due to program termination. Prior to the shutdown of EBR-II, an in-service inspection (ISI) program was developed that exploited certain advantages of the LMR design. For example, it demonstrated passive response to plant upset events, low-pressure primary coolant, and compatibility of the coolant and reactor materials. This ISI program was based on work currently being done by an American Society of Mechanical Engineers (ASME) Research Task Force on Risk-Based Inspection

  13. Inter-vessels in-service inspection of Super-Phenix

    International Nuclear Information System (INIS)

    Asty, M.; Saglio, R.; Viard, J.; Lerat, B.

    1984-01-01

    The vessels design of fast breeder reactor Super-Phenix enables inspection during operating time. A self-moving machine -MIR- has been built up especially for that purpose. It is able to carry out visual and ultrasonorous inspection. MIR structure is that of a tetrahedron, all tops of which are fitted with two wheels, as for traction and direction. The wheels are leaning on booth the two vessels. Thanks to a computer-assisted control system, MIR is able to move along in every part of the inter-vessels space. Studies have been carried on at the French Commissariat a l'Energie Atomique, by two Sections of the advanced technologies Service. After outlining MIR working conditions, its main characteristics are described [fr

  14. Active Holiday in Mt. Zlatibor County

    Directory of Open Access Journals (Sweden)

    Jovan Plavša

    2009-01-01

    Full Text Available Active holiday presents a new stream in tourism development of Serbia. The most interesting types of active holiday in Serbia are: free and mountain biking, rafting, hiking, mountaineering, free climbing, orienteering, fishing, sailing, rowing, paragliding, cave exploring, skiing, survival in nature, zorbing, horse riding, etc. Zlatibor district is almost perfect area for developing active holiday, due to the nature beauties and diversity of landscape. The most atractive parts for developing active holiday in Zlatibor district are: Tara Mountain and Drina River Gorge, Zlatibor Mountain, Uvac River Gorge and Zlatar Mountain, Lim River Valley and Pester Highlands.

  15. 78 FR 52127 - Tobacco Inspection and Grading Services: Notice of Request for an Extension of a Currently...

    Science.gov (United States)

    2013-08-22

    ... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service [AMS-CN-13-0046] Tobacco Inspection and...: Agricultural Marketing Service, USDA. ACTION: Notice and request for comments. SUMMARY: In accordance with the... 16, 2013. Rex A. Barnes, Associate Administrator, Agricultural Marketing Service. [FR Doc. 2013-20439...

  16. 5 CFR 610.202 - Determining the holiday.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Determining the holiday. 610.202 Section... DUTY Holidays § 610.202 Determining the holiday. For purposes of pay and leave, the day to be treated as a holiday is determined as follows: (a) Except when employees are entitled to a different holiday...

  17. RSE-M: In-Service Inspection Rules for Mechanical Components of PWR Nuclear Islands

    International Nuclear Information System (INIS)

    2016-01-01

    The RSE-M code defines in-service inspection operations. It applies to pressure equipment used in PWR plants, as well as spare parts for such equipment. The RSE-M code does not apply to equipment made from materials other than metal. It is based on the RCC-M code for requirements relating to the design and fabrication of mechanical components. Use: The inspection rules specified in the RSE-M code describe the standard requirements of best practice within the French nuclear industry, based on its own feedback from operating several nuclear units and partly supplemented with requirements stipulated by French regulations. To date, the 58 units in France's nuclear infrastructure enforce the in-service inspection rules of the RSE-M code. Operation of 30 commissioned units in China's nuclear infrastructure, corresponding to the M310, CPR-1000 and CPR-600 reactors, is based on the RSE-M code (since 2007, use of AFCEN codes has been required by NNSA for Generation II+ reactors). Contents of the 2016 Edition: Volume I - Rules: Section A - General rules, Section B - Specific rules for class 1 components, Section C - Specific rules for class 2 or 3 components, Section D - Specific rules for components not assigned to any particular RSE-M class; Volume II - Appendices 1 to 8: Appendices 1.0 to 1.9: supporting appendices for the general requirements, Appendix 2.1: appendix associated with chap. 2000 Requalifications, Hydraulic Proof Tests and Hydraulic Tests, Appendices 4.1 to 4.4: appendices associated with chap. 4000 Examination techniques, Appendices 5.1 to 5.8 and RPP2: appendices associated with chap. 5000 Mechanical and Materials, Appendices 8.1 to 8.2: appendices associated with chap. 8000 Maintenance Operations; Volume III: Appendix 3.1 - Visit tables: main primary and secondary systems, EPR pre-service inspection program, Class 2 or 3 vessels; Appendix 3.2 - Inspection Plans For Non-Nuclear Pressure Equipment

  18. In-service inspection and maintenance schedule for a typical TRIGA Mark-II reactor

    International Nuclear Information System (INIS)

    Boeck, H.

    1996-05-01

    This report lists all the systems and components of the TRIGA reactor Vienna which are inspected and maintained in regular intervals. These intervals are categorized in monthly, quarterly, semi-annual and annual inspections. Further the type of inspection and the responsibility for the inspection is shown. For each component specific inspection sheets have been developed, some examples are given in the annex. (author)

  19. Effect of a Publicly Accessible Disclosure System on Food Safety Inspection Scores in Retail and Food Service Establishments.

    Science.gov (United States)

    Choi, Jihee; Scharff, Robert L

    2017-07-01

    The increased frequency with which people are dining out coupled with an increase in the publicity of foodborne disease outbreaks has led the public to an increased awareness of food safety issues associated with food service establishments. To accommodate consumer needs, local health departments have increasingly publicized food establishments' health inspection scores. The objective of this study was to estimate the effect of the color-coded inspection score disclosure system in place since 2006 in Columbus, OH, by controlling for several confounding factors. This study incorporated cross-sectional time series data from food safety inspections performed from the Columbus Public Health Department. An ordinary least squares regression was used to assess the effect of the new inspection regime. The introduction of the new color-coded food safety inspection disclosure system increased inspection scores for all types of establishments and for most types of inspections, although significant differences were found in the degree of improvement. Overall, scores increased significantly by 1.14 points (of 100 possible). An exception to the positive results was found for inspections in response to foodborne disease complaints. Scores for these inspections declined significantly by 10.2 points. These results should be useful for both food safety researchers and public health decision makers.

  20. Statistical Sampling For In-Service Inspection Of Liquid Waste Tanks At The Savannah River Site

    International Nuclear Information System (INIS)

    Harris, S.

    2011-01-01

    Savannah River Remediation, LLC (SRR) is implementing a statistical sampling strategy for In-Service Inspection (ISI) of Liquid Waste (LW) Tanks at the United States Department of Energy's Savannah River Site (SRS) in Aiken, South Carolina. As a component of SRS's corrosion control program, the ISI program assesses tank wall structural integrity through the use of ultrasonic testing (UT). The statistical strategy for ISI is based on the random sampling of a number of vertically oriented unit areas, called strips, within each tank. The number of strips to inspect was determined so as to attain, over time, a high probability of observing at least one of the worst 5% in terms of pitting and corrosion across all tanks. The probability estimation to determine the number of strips to inspect was performed using the hypergeometric distribution. Statistical tolerance limits for pit depth and corrosion rates were calculated by fitting the lognormal distribution to the data. In addition to the strip sampling strategy, a single strip within each tank was identified to serve as the baseline for a longitudinal assessment of the tank safe operational life. The statistical sampling strategy enables the ISI program to develop individual profiles of LW tank wall structural integrity that collectively provide a high confidence in their safety and integrity over operational lifetimes.

  1. Automatic ultrasonic testing and the LOFT in-service inspection program

    International Nuclear Information System (INIS)

    Hunter, J.A.

    1980-01-01

    An automatic ultrasonic testing system has been developed which significantly improves the flaw indication detection and characterization capability over the capability of conventional volumetric examination techniques. The system utilizes an accurately located ultrasonic sensor to generate the examination data. A small computer performs and integrates control and data input/output functions. Computer software has been developed to provide a rigorous method for data analysis and ultrasonic image interpretation. The system has been used as part of an in-service inspection program to examine welds in thich austenitic stainless steel pipes in a small experimental nuclear reactor

  2. Level of Service Program for INDOT Operations : APPENDIX A State Inspection Programs

    Science.gov (United States)

    2012-01-01

    INDOT has used an inspection program named Maintenance Quality Survey (MQS) to perform a statewide inspection of their roadway assets, rightofway to rightofway. This inspection requires two twoperson teams approximately 18 months to...

  3. In-service Inspection of Radioactive Waste Tanks at the Savannah River Site – 15410

    Energy Technology Data Exchange (ETDEWEB)

    Wiersma, Bruce [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Maryak, Matthew [Savannah River Remediation, LLC., Aiken, SC (United States); Baxter, Lindsay [Univ. of Notre Dame, IN (United States); Harris, Stephen [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Elder, James [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2015-01-12

    Liquid radioactive wastes from the Savannah River Site (SRS) separation process are stored in large underground carbon steel tanks. The high level wastes are processed in several of the tanks and then transferred by piping to other site facilities for further processing before they are stabilized in a vitrified or grout waste form. Based on waste removal and processing schedules, many of the tanks will be required to be in service for times exceeding the initial intended life. Until the waste is removed from storage, transferred, and processed, the materials and structures of the tanks must maintain a confinement function by providing a barrier to the environment and by maintaining acceptable structural stability during design basis events, which include loadings from both normal service and abnormal (e.g., earthquake) conditions. A structural integrity program is in place to maintain the structural and leak integrity functions of these waste tanks throughout their intended service life. In-service inspection (ISI) is an essential element of a comprehensive structural integrity program for the waste tanks at the Savannah River Site (SRS). The ISI program was developed to determine the degree of degradation the waste tanks have experienced due to service conditions. As a result of the inspections, an assessment can be made of the effectiveness of corrosion controls for the waste chemistry, which precludes accelerated localized and general corrosion of the waste tanks. Ultrasonic inspections (UT) are performed to detect and quantify the degree of general wall thinning, pitting and cracking as a measure of tank degradation. The results from these inspections through 2013, for the 27 Type III/IIIA tanks, indicate no reportable in-service corrosion degradation in the primary tank (i.e., general, pitting, or cracking). The average wall thickness for all tanks remains above the manufactured nominal thickness minus 0.25 millimeter and the largest pit identified is

  4. Fire Safety During the Holiday Season | Poster

    Science.gov (United States)

    Winter is here, and that means holiday decorations, a warm hearth, and (hopefully) plenty of homecooked meals. Unfortunately, winter also brings numerous fire hazards both at work and around the house. This year, as you shop, decorate, and celebrate, keep these safety tips in mind to ensure a safe and enjoyable holiday season.

  5. 28 CFR 345.58 - Holiday pay.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Holiday pay. 345.58 Section 345.58... (FPI) INMATE WORK PROGRAMS Inmate Pay and Benefits § 345.58 Holiday pay. An inmate worker in FPI work status shall receive pay at the standard hourly rate, plus longevity where applicable, for all Federal...

  6. Traditional Festivals to Become Legal Holidays

    Institute of Scientific and Technical Information of China (English)

    2007-01-01

    @@ As nearly everyone knows already,the state is going to rearrange the schedule of legal holidays. The four traditional Chinese festivals, inluding Mid-Autumn Day, Dragon Boat Festival,Tomb-Sweeping Day and Spring Festival Eve, will be made into legal holidays. As for the Golden Week system, should it be continued or canceled?

  7. Recent Developments in Ruined Holiday Damage

    Directory of Open Access Journals (Sweden)

    Riccardo Campione

    2010-07-01

    Full Text Available The aim of this brief presentation is to evaluate the status of ruined holiday damage (i.e. the loss of enjoyment suffered by a tourist who experiences a holiday of inferior quality in Italian law since the recent case law on moral damages.

  8. Sigma: computer vision in the service of safety and reliability in the inspection services

    International Nuclear Information System (INIS)

    Pineiro, P. J.; Mendez, M.; Garcia, A.; Cabrera, E.; Regidor, J. J.

    2012-01-01

    Vision Computing is growing very fast in the last decade with very efficient tools and algorithms. This allows new development of applications in the nuclear field providing more efficient equipment and tasks: redundant systems, vision-guided mobile robots, automated visual defects recognition, measurement, etc., In this paper Tecnatom describes a detailed example of visual computing application developed to provide secure redundant identification of the thousands of tubes existing in a power plant steam generator. some other on-going or planned visual computing projects by Tecnatom are also introduced. New possibilities of application in the inspection systems for nuclear components appear where the main objective is to maximize their reliability. (Author) 6 refs.

  9. French codes and standards for design, construction and in-service inspection of nuclear power plants

    International Nuclear Information System (INIS)

    Hugot, G.; Grandemange, J. M.

    1995-01-01

    In 1970, France decided that its future power plants would be of the Pressurized Water Reactor type. This choice proved to be successful since it resulted in more than 60 PWR units in operation or under construction in France and abroad. At the beginning of such a program, the French engineering and manufacturing industry, the national electrical utility and the Safety Authorities had to face the many challenges imposed by the implementation of an imported technology. The government reorganised the licensing process. FRAMATOME, the NSSS vendor, and EDF (Electricite de France), the national utility, decided to create 'AFCEN', the French Association for Design and Construction Rules for Nuclear Island Components. These rules, the RCC's (Regles de Construction et de conception), which are approved by French Safety Authorities deal with mechanical and electrical equipment as well as with nuclear fuel and civil works. They are now being supplemented by in service inspection rules, the RSE's (Regles d'inspection en Service). The paper presents these Codes and their main updating following experience of application, technical progress and evolution of standards. Status of discussion concerning reference to European standardisation and developments of rules applicable to the EPR project will also be discussed

  10. The ASME research task force on risk-based in-service inspection

    International Nuclear Information System (INIS)

    Balkey, K.R.; Chapman, O.J.V.

    1997-01-01

    The use of risk-based methods in the development of in-service inspection (ISI) and in-service testing (IST) programs for nuclear power plant and other industrial applications has been studied for the last several years through the American Society of Mechanical Engineers Centre for Research and Technology Development (ASME 1991, 1992, 1994, 1996). The results of this work are being used as a foundation to develop specific requirements for implementation of risk-based technology in ASME Codes and Standards, regulatory requirements and industry programs both in the U.S. and other countries. This paper provides a brief overview of the ASME Research Methodology and how it has been adapted for application to the inspection of piping within the USA. It also relates how the reliability of nondestructive examination (NDE) methods for pressure boundary components can impact the risk and discusses the relationship between this and NDE qualification/demonstration now being implemented in Europe and the USA. (orig.)

  11. Overview of improvements in work practices and instrumentation for CANDU primary heat transport feeders in-service inspections

    Energy Technology Data Exchange (ETDEWEB)

    Marcotte, O., E-mail: olivier@nucleom.ca [Nucleom Inc., Quebec, Quebec (Canada); Rousseau, G., E-mail: rousseau.gilles.a@hydro.qc.ca [Hydro Quebec, Becancour, Quebec (Canada); Rochefort, E., E-mail: erochfort@zetec.com [Zetec Canada, Quebec, Quebec (Canada)

    2013-01-15

    The Canadian nuclear industry has developed many advanced non-destructive inspection techniques to be applied safely in hazardous environments in recent years. Automated systems, manual tooling and specialized software modules have been designed since early 2000s to provide complete and very efficient fitness for service inspection of primary heat transport system carbon steel feeder pipes. These techniques deal with complex geometries, difficult access and, radioactive environment. Complementary NDE techniques, namely Ultrasounds, eddy current, phased-array UT and automated scanners are used. This presentation describes the improvements in inspection practices and the advanced data analysis features. (author)

  12. Report on the Regulators Experience of NDT Qualification for In-service Inspection of Nuclear Components

    International Nuclear Information System (INIS)

    2003-08-01

    In November 1992, the Nuclear Regulators Working Group (NRWG) decided to set up a task force on qualification of non-destructive testing (NDT) systems for pre and in-service inspection of light water reactors. The first task was to agree on the philosophy and principles governing the qualification of techniques, equipment, software, procedures, and personnel for NDT to be used for the inspection of structural components that are important to safety in nuclear power plants; and to establish a common view on essential aspects of NDT qualifications. The first task, which also included a comparison of the common views of the European regulators with the qualification approach outlined in Appendix VIII to Section XI of the ASME Code, was completed in 1996. The result was published in the report ''Common position of European regulators on qualification of NDT systems for pre- and in-service inspection of light water reactor components''2. In parallel, the European nuclear power industries had set up a working group, the European Network for Inspection Qualification (ENIQ), to discuss and agree on how to perform inspection qualifications. In 1995, ENIQ finalized its first version of ''European methodology for qualification of non-destructive tests''3. A second version 4 was then published in 1997. This second version is in relatively close agreement with the principles given in the regulators common position document. With these two basic documents, a platform was established for the further development of qualification strategies in the European countries. The second task of the NRWG Task Force was to follow and evaluate the first ENIQ pilot study from a regulatory point of view. The objective of this pilot study was to explore ways of how to apply the European qualification methodology and to test its feasibility. The pilot study commenced late 1996 and was planned to be finalized a year later. Depending on unforeseen difficulties, the pilot study has been delayed

  13. Applicability of PSA Issues for Risk Assessment during Optimisation of In-Service Inspection

    International Nuclear Information System (INIS)

    Kolykhanov, V.; Skalozubov, V.; Kovrigkin, Y.

    2006-01-01

    The current codes determining periodicity of in-service inspection of the NPP equipment have been formed using deterministic approaches and have an unnecessary degree of conservatism. A perspective direction of perfection of normative base is decision making on a basis of risk-informed methodologies. It allows to increase safety of NPP equipment's operation and to optimise programs on inspection of the equipment subject to limited resources by focusing efforts on the most safety significant elements of the equipment. It is internationally accepted that methodology of the probabilistic safety analysis (PSA) is the most universal and comprehensive tool focused on the general assessment of safety of NPP as a whole. By now, PSA Level 1 is fulfilled for all pilot units of the Ukrainian NPPs that is a valuable result, which should be taken into account at an assessment of reliability of the equipment. However, specificity of PSA methodology should be taken into account at the decision of the particular tasks aimed at optimisation of maintenance of the equipment within individual systems. The estimation of the contribution to core damage frequency (CDF) is a PSA issue usually used to assess the significance of consequences of failure of a system/equipment during risk-informed decision-making. This work shows that above factor is only a part of assessment of the significance of consequences as core damage can be expressed in different amount of the damaged fuel elements and, hence, severity of consequences. Besides CDF is directly affected only by active elements which failure can be an initiating event. PSA methodology uses averaged reliability factors of the equipment for all possible operating modes occurring at transitive accident process. Here, there are limited opportunities to account impact of periodicity of maintenance of the equipment on reliability and to predict impact of change of the inspection program. PSA methodology does not allow taking into account

  14. PRODUCING NEW SALES MATERIAL FOR INTERNATIONAL SALES OF HOLIDAY CLUB KATINKULTA

    OpenAIRE

    Sipilä, Marjo

    2011-01-01

    The aim of this action based thesis was to create new sales material in English for international sales of Holiday Club Katinkulta. The material concentrates on the services offered in the spa hotel side. The spa hotel was sold to its former owner Holiday Club Resorts ltd during the thesis writing process and all sales material required updating after the ownership change. The new sales material is produced for the aid of daily sales work of sales representatives in the field of internati...

  15. Maintenance, surveillance and in-service inspection in nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2002-01-01

    Effective maintenance, surveillance and in-service inspection (MS and I) are essential for the safe operation of a nuclear power plant. The objective of this Safety Guide is to provide recommendations and guidance for MS and I activities to ensure that SSCs important to safety are available to perform their functions in accordance with the assumptions and intent of the design. This Safety Guide covers the organizational and procedural aspects of MS and I. However, it does not give detailed technical advice in relation to particular items of plant equipment, nor does it cover inspections made for and/or by the regulatory body. This Safety Guide provides recommendations and guidance for preventive and remedial measures, including testing, surveillance and in-service inspection, that are necessary to ensure that all plant structures, systems and components (SSCs) important to safety are capable of performing as intended. This Safety Guide covers measures for fulfilling the organizational and administrative requirements for: establishing and implementing schedules for preventive and predictive maintenance, repairing defective plant items, selecting and training personnel, providing related facilities and equipment, procuring stores and spare parts, and generating, collecting and retaining maintenance records for establishing and implementing an adequate feedback system for information on maintenance. MS and I should be subject to quality assurance in relation to all aspects important to safety. Quality assurance has been dealt with in detail in other IAEA safety standards and is covered here only in specific instances, for emphasis. In Section 2, a concept of MS and I is presented and the interrelationship between maintenance, surveillance and inspection is discussed. Section 3 concerns the functions and responsibilities of different organizations involved in MS and I activities. Section 4 provides recommendations and guidance on such organizational aspects as

  16. Maintenance, surveillance and in-service inspection in nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2005-01-01

    Effective maintenance, surveillance and in-service inspection (MS and I) are essential for the safe operation of a nuclear power plant. The objective of this Safety Guide is to provide recommendations and guidance for MS and I activities to ensure that SSCs important to safety are available to perform their functions in accordance with the assumptions and intent of the design. This Safety Guide covers the organizational and procedural aspects of MS and I. However, it does not give detailed technical advice in relation to particular items of plant equipment, nor does it cover inspections made for and/or by the regulatory body. This Safety Guide provides recommendations and guidance for preventive and remedial measures, including testing, surveillance and in-service inspection, that are necessary to ensure that all plant structures, systems and components (SSCs) important to safety are capable of performing as intended. This Safety Guide covers measures for fulfilling the organizational and administrative requirements for: establishing and implementing schedules for preventive and predictive maintenance, repairing defective plant items, selecting and training personnel, providing related facilities and equipment, procuring stores and spare parts, and generating, collecting and retaining maintenance records for establishing and implementing an adequate feedback system for information on maintenance. MS and I should be subject to quality assurance in relation to all aspects important to safety. Quality assurance has been dealt with in detail in other IAEA safety standards and is covered here only in specific instances, for emphasis. In Section 2, a concept of MS and I is presented and the interrelationship between maintenance, surveillance and inspection is discussed. Section 3 concerns the functions and responsibilities of different organizations involved in MS and I activities. Section 4 provides recommendations and guidance on such organizational aspects as

  17. Air pollution holiday effect in metropolitan Kaohsiung

    Science.gov (United States)

    Tan, P.; Chen, P. Y.

    2014-12-01

    Different from Taipei, the metropolitan Kaohsiung which is a coastal and industrial city has the major pollution sources from stationary sources such as coal-fired power plants, petrochemical facilities and steel plants, rather than mobile sources. This study was an attempt to conduct a comprehensive and systematical examination of the holiday effect, defined as the difference in air pollutant concentrations between holiday and non-holiday periods, over the Kaohsiung metropolitan area. We documented evidence of a "holiday effect", where concentrations of NOx, CO, NMHC, SO2 and PM10 were significantly different between holidays and non-holidays, in the Kaohsiung metropolitan area from daily surface measurements of seven air quality monitoring stations of the Taiwan Environmental Protection Administration during the Chinese New Year (CNY) and non-Chinese New Year (NCNY) periods of 1994-2010. Concentrations of the five pollutants were lower in the CNY than in the NCNY period, however, that of O3 was higher in the CNY than in the NCNY period and had no holiday effect. The exclusion of the bad air quality day (PSI > 100) and the Lantern Festival Day showed no significant effects on the holiday effects of air pollutants. Ship transportation data of Kaohsiung Harbor Bureau showed a statistically significant difference in the CNY and NCNY period. This difference was consistent with those found in air pollutant concentrations of some industrial and general stations in coastal areas, implying the possible impact of traffic activity on the air quality of coastal areas. Holiday effects of air pollutants over the Taipei metropolitan area by Tan et al. (2009) are also compared.

  18. Ultrasonic wall thickness gauging for ferritic steam generator tubing as an in-service inspection tool

    International Nuclear Information System (INIS)

    Haesen, W.M.J.; Tromp, Th.J.

    1980-01-01

    In-service inspection of LWR steam generators is more or less a standard routine operation. The situation can be very different for LMFBRs. For the SNR 300 (Kalkar Power Station) the situation is different because the steam generators have ferritic tubing. The tube walls are comparatively thick, 2 to 4.5 mm. During inservice examinations the steam generators will be drained on both sides, however on the sodium side a sodium film will be present. Furthermore the SNR 300 will have two types of steam generator. A straight tube design and a helical coil design will be used. Both types consist of a evaporator and superheater. The steam generators are of course not radioactive. It is obvious that in this case the eddy current (EC) technique is not an enviable inservice inspection tool. Basically EC is a surface flaw detection technique. Only the saturation magnetisation method will improve the EC technique sufficiently for ferritic material. However the 'in bore examination' with the saturation technique was, in case of the SNR 300 steam generator tubing, considered impossible since the inner diameters are fairly small. Furthermore sodium traces may influence the EC method. Although multifrequency methods can solve this problem, EC is not considered as a useful tool for examining ferritic tubing. Another method is to employ the 'stray flux' method which is under development with the TNO organization in Holland. The EC and stray flux method do have one drawback, these methods do not detect gradual changes in wall thickness. Ultrasonic examinations will be used in the SNR 300 as the main inspection tool for the steam generators. In this paper the reasons why ultrasonic examination was selected are explained. The results of the development work on this subject are discussed

  19. Holiday season for a healthy heart.

    Science.gov (United States)

    Stamps, Deborah C; Carr, Marcella L

    2012-12-01

    The term "holiday heart" is defined as an acute cardiac arrhythmia or conduction disturbance associated with heavy alcohol intake in individuals with no known heart disease, but in whom heart rhythm is restored to normal with abstinence of alcohol. This article provides a brief overview of the literature on this topic, discusses causes of increased cardiac events during the holiday season, describes a patient profile and the effect on patients' health as well as on their families, and provides suggestions to decrease the risk of holiday heart during the festive season. Copyright © 2012 Elsevier Inc. All rights reserved.

  20. An automated eddy current in-service inspection system for nuclear steam generator tubing

    International Nuclear Information System (INIS)

    Wells, N.S.

    1981-06-01

    A prototype steam generator in-service inspection system incorporating remotely-controlled instrumentation linked by a digital transmission line to an instrument and control trailer outside the reactor containment has been designed and manufactured and is presently undergoing field tests. The (Monel 400) steam generator tubes are scanned two at a time using absolute eddy current probes controlled by two remotely-operated probe drives at a scanning speed of 0.5 m/s. The probes are positioned on the tubesheet by a light-weight (1.5 kg) microprocessor-operated tubesheet walker mechanism. Digitized control and data signals are transmitted up to 300 m to the control trailer. There the control and analysis computers extract the relevant signal information and present it in condensed form as labelled graphics on CRT consoles for on-line visual assessment. Hard copy output is also provided for each tube scanned (one per minute). Condensed data is archived on magnetic tapes for additional off-line analysis and comparisons with other inspections

  1. Evaluation of sampling plans for in-service inspection of steam generator tubes

    International Nuclear Information System (INIS)

    Kurtz, R.J.; Heasler, P.G.; Baird, D.B.

    1994-02-01

    This report summarizes the results of three previous studies to evaluate and compare the effectiveness of sampling plans for steam generator tube inspections. An analytical evaluation and Monte Carlo simulation techniques were the methods used to evaluate sampling plan performance. To test the performance of candidate sampling plans under a variety of conditions, ranges of inspection system reliability were considered along with different distributions of tube degradation. Results from the eddy current reliability studies performed with the retired-from-service Surry 2A steam generator were utilized to guide the selection of appropriate probability of detection and flaw sizing models for use in the analysis. Different distributions of tube degradation were selected to span the range of conditions that might exist in operating steam generators. The principal means of evaluating sampling performance was to determine the effectiveness of the sampling plan for detecting and plugging defective tubes. A summary of key results from the eddy current reliability studies is presented. The analytical and Monte Carlo simulation analyses are discussed along with a synopsis of key results and conclusions

  2. Nuclear reactor capable of electric power generation during in-service inspection

    International Nuclear Information System (INIS)

    Nakamura, Shinsuke; Nogami, Hitoshi.

    1992-01-01

    The nuclear power plant according to the present invention can generate electric power even in a period when one of a pair of reactors is put to in-service inspection. That is, the nuclear power plant of the present invention comprises a system constitution of two nuclear reactors each of 50% thermal power and one turbine power generator of 100% electric power. Further, facilities of various systems relevant to the two reactors each of 50% thermal power, as a pair, are used in common as much as possible in order to reduce the cost for construction and maintenance/ inspection. Further, a reactor building and a turbine building disposed in adjacent with each for paired two reactors each of 50% thermal power are arranged vertically. This arrangement can facilitate the common use of the facilities for various systems and equipments to attain branching and joining of fluids in reactor feed water systems and main steam system pipelines easily with low pressure loss and low impact shocks. The facility utilization factor of such reactors is remarkably improved by doubling the period of continuous power generation. As a result, economic property is remarkably improved. (I.S.)

  3. Reliability-based service life assessment of concrete structures in nuclear power plants: optimum inspection and repair

    International Nuclear Information System (INIS)

    Ellingwood, B.R.; Mori, Y.

    1995-01-01

    Research is being conducted to address aging management of safety-related reinforced concrete structures in nuclear power plants (NPPs). Documentation is being prepared to identify potential structural safety issues and to recommend criteria for use in evaluating reinforced concrete structures for continued service. Time-dependent reliability analysis provides the framework and quantitative tools for the condition assessment. The role of in-service inspection and repair in ensuring continued reliability in-service is examined. (author). 19 refs., 4 figs

  4. In service inspection of pipes based on risk methods; Inspeccion en servicio de tuberias basada en metodos de riesgo

    Energy Technology Data Exchange (ETDEWEB)

    Mendoza G, G.; Viais J, J.; Carmona C, M. [ININ, Centro Nuclear ' Dr. Nabor Carrillo Flores' , Carretera Mexico Toluca, S/N. La Marquesa, Ocoyoacac, Mexico, C. P. 52750 (Mexico)]. e-mail: gmg@nuclear.inin.mx

    2006-07-01

    The politics of the Nuclear Regulatory Commission (by its initials in English NRC) of the United States of America on the use of the Probabilistic Safety Analysis (PSA) in activities of nuclear regulation it foments the use of this analysis technique to improve the decisions making, to reduce the unnecessary work in maintenance aspects, inspection and tests and to improve the regulatory efficiency. The inspection programs in service (ISI by its initials in English) developed by the American Society of Mechanical Engineers (by its initials in English ASME) it has been the one primary mechanism to prove the mechanical equipment in plants of nuclear energy, these programs indeed have been carried out in plants of nuclear energy by more of two decades. Their purpose is to identify the conditions, such as indications of cracks that are precursory of flights and ruptures which violate the integrity principles of the pressure frontier. The inspection in service activities include ultrasonic tests, surface tests and penetrating liquids test, also activities that include the scaffolds construction, removal of insulations and welding polishing. The inspections in service every 18 months during the times outside of service are executed. One of the objectives is to lower the costs of the inspections during the times outside of service and to reduce the exposure to the radiation by part of the personnel during these times out for inspections, while it is increased or it maintains the personnel's safety and the reliability. As part of the methodology a pipe segment is selected for which a fault in any point has the same consequences, being calculated the fault probability of the tube using the dimensions of the segment. In this work the inspection in service methodology is applied based on risk to an aspersion system of low pressure of the Laguna Verde Nucleo electric Central. For this system a reduction in the number of welding to inspect of 103 to only 15 is obtained

  5. Automation of eddy current system for in-service inspection of turbine and generator rotor bores

    International Nuclear Information System (INIS)

    Anon.

    1987-01-01

    The current project (EPRI-RP-1975-5) is a continuation of activities that began several years ago. Those results (EPRI-RP-1957-1) indicated that eddy current testing shows promise for in-service inspection. The current project investigates the degree to which eddy current testing can be used to replace bore magnetic particle testing. For this purpose, correlation studies between eddy current and magnetic particle tests are being undertaken on laboratory rotor sections and field test pieces of rotors. The eddy current data are to be gathered automatically by a combination of the Nortec-25L Eddyscope (to provide the analog eddy current signals) and the General Electric DATAQ/sup TM/ (a registered trademark of the General Electric Co.) System (to perform the automatic data acquisition). This paper describes some test results on a flaked laboratory rotor section

  6. The influence of frequency and reliability of in-service inspection on reactor pressure vessel disruptive failure probability

    International Nuclear Information System (INIS)

    Jordan, G.M.

    1977-01-01

    A simple probabilistic methodology is used to investigate the benefit, in terms of reduction of disruptive failure probability, which comes from the application of periodic In Service Inspection (ISI) to nuclear pressure vessels. The analysis indicates the strong interaction between inspection benefit and the intrinsic quality of the structure. In order to quantify the inspection benefit, assumptions are made which allow the quality to be characterized in terms of the parameters governing a Log Normal distribution of time-to-failure. Using these assumptions, it is shown that the overall benefit of ISI is unlikely to exceed an order of magnitude in terms of reduction of disruptive failure probability. The method is extended to evaluate the effect of the periodicity and reliability of the inspection process itself. (author)

  7. 5 CFR 532.507 - Pay for holiday work.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Pay for holiday work. 532.507 Section 532... SYSTEMS Premium Pay and Differentials § 532.507 Pay for holiday work. (a) An employee who is entitled to holiday premium pay and who performs work on a holiday which is not overtime work shall be paid the...

  8. Prognosis following cancer surgery during holiday periods.

    Science.gov (United States)

    Lagergren, Jesper; Mattsson, Fredrik; Lagergren, Pernilla

    2017-11-15

    Surgery is the mainstay curative treatment in most cancer. We aimed to test the new hypothesis that cancer surgery performed during holiday periods is associated with worse long-term prognosis than for non-holiday periods. This nationwide Swedish population-based cohort study included 228,927 patients during 1997-2014 who underwent elective resectional surgery for a cancer where the annual number of resections was over 100. The 16 eligible cancer sites were grouped into 10 cancer groups. The exposure, holiday periods, was classified as wide (14-weeks) or narrow (7-weeks). Surgery conducted inside versus outside holiday periods was compared regarding overall disease-specific (main outcome) and overall all-cause (secondary outcome) mortality. Cox regression provided hazard ratios (HR) with 95% confidence intervals (CI) adjusted for age, sex, comorbidity, hospital volume, calendar period and tumor stage. Surgery conducted during wide and narrow holiday periods were associated with increased HRs of disease-specific mortality for cancer of the breast (HR 1.08, 95% CI 1.03-1.13 and HR 1.06, 95% CI 1.01-1.12) and possibly of cancer of the liver-pancreas-bile ducts (HR 1.09, 95% CI 0.99-1.20 and HR 1.12, 95% CI 0.99-1.26). Sub-groups with cancer of the colon-rectum, head-and-neck, prostate, kidney-urine bladder and thyroid also experienced statistically significantly worse prognosis following surgery conducted during holiday periods. No influence of surgery during holiday was detected for cancer of the esophagus-stomach, lung or ovary-uterus. All-cause HRs were similar to the disease-specific HRs. The prognosis following cancer surgery might not be fully maintained during holiday periods for all cancer sites. © 2017 UICC.

  9. The operator's requirement for in service inspection at Hinkley Point 'B' power station

    International Nuclear Information System (INIS)

    Outram, J.F.

    The subject is discussed under the following heads: the need for reactor internal inspection (safety; commercial interest); the methods available (man access inspection; remote viewing inspection); experience with man access; experience with remote viewing; reactor outage time -comparison of the two methods; contamination control; conclusions. (U.K.)

  10. 7 CFR 868.61 - How to request appeal inspection service.

    Science.gov (United States)

    2010-01-01

    ... may be made with the Board of Appeals and Review or the field office that performed the appeal... application shall be made: (i) Before the rice has left the place where the inspection being appealed was... inspection be based on: (i) The file sample or (ii) a new sample. However, an appeal inspection shall be...

  11. Hospital Inspections

    Data.gov (United States)

    U.S. Department of Health & Human Services — Welcome to hospitalinspections.org, a website run by the Association of Health Care Journalists (AHCJ) that aims to make federal hospital inspection reports easier...

  12. Development of in-service inspection plans for nuclear components at the Surry 1 nuclear power station

    International Nuclear Information System (INIS)

    Vo, T.V.; Simonen, F.A.; Doctor, S.R.; Smith, B.W.; Gore, B.F.

    1993-01-01

    As part of the nondestructive evaluation reliability program sponsored by the US Nuclear Regulatory Commission at Pacific Northwest Laboratory, a methodology has been developed for establishing in-service inspection priorities of nuclear power plant components. The method uses results of probabilistic risk assessment in conjunction with the techniques of failure modes and effects analysis to identify and prioritize the most risk-important systems and components for inspection at nuclear power plants. Surry nuclear power station unit 1 was selected for demonstrating the methodology. The specific systems selected for analysis were the reactor pressure vessel, the reactor coolant, the low pressure injection including the accumulators, and the auxiliary feedwater. The results provide a risk-based ranking of components that can be used to establish a prioritization of the components and a basis for developing improved in-service inspection plans at nuclear power plants

  13. Activities with regard to research and development of technics for SNR 300 reactor vessel in-service inspection procedures

    International Nuclear Information System (INIS)

    Hoeller, K.; Kirchner, G.; Menck, J.

    1980-01-01

    During the development of SNR 300 in-service inspection equipment, several branches were tested by experiment. In this report special steps for testing of manipulation systems and additional engineering equipment for control systems, such as coupling fluid circuit or camera cooling system are considered more in detail

  14. State-of-practice review of ultrasonic in-service inspection of Class I system piping in commercial nuclear power plants

    International Nuclear Information System (INIS)

    Morris, C.J.; Becker, F.L.

    1982-08-01

    The Pacific Northwest Laboratory conducted a survey to determine the state of practice of ultrasonic in-service inspection of primary system piping in light water reactors. Personnel at four utilities, five inspection organizations, and three domestic reactor manufacturers were interviewed. The intention of the study was to provide a better understanding of the actual practices employed in in-service inspection of primary system piping and of the difficulties encountered

  15. Motor vehicle-related deaths around two major holidays in South Korea.

    Science.gov (United States)

    Sohn, Kitae

    2017-10-01

    South Korea has consistently exhibited high rates of motor vehicle-related deaths (MVDs) since the late 1980s. This study investigated the number of MVDs around two major public holidays in South Korea-Lunar New Year's Day and Thanksgiving Day. MVDs from records of all individual deaths in 1997-2014 were extracted; then, MVDs per day from 14 days before and after each holiday (ie, 29 days in total) were summed across the years. Eventually, the 3-day mean values of MVDs before and after the holiday were compared, when holiday-related traffic peaks. The 3-day mean before Lunar New Year's Day was 385 fatalities, but dropped to 324 after the holiday; the corresponding figures for Thanksgiving Day were 494 and 413. These results are contrary to those of other countries. It appears that the severe congestion of highway traffic around the holidays resulted in a decrease in MVDs. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/.

  16. Diagnostic efficiency of abattoir meat inspection service in Ethiopia to detect carcasses infected with Mycobacterium bovis: implications for public health.

    Science.gov (United States)

    Biffa, Demelash; Bogale, Asseged; Skjerve, Eystein

    2010-08-06

    public health. Standardization of abattoir inspection protocols (in line with international sanitary requirements), enhanced training and proficiency testing of meat inspections, and raising public awareness are recommended as essential and cost-effective interventions to improve meat inspection service in Ethiopia, with subsequent protection of consumers' health.

  17. Development of In-Service Inspection system for heat transfer tubes in the primary pressurized water cooler in the HTTR

    Energy Technology Data Exchange (ETDEWEB)

    Shinozaki, Masayuki; Furusawa, Takayuki [Japan Atomic Energy Research Inst., Oarai, Ibaraki (Japan). Oarai Research Establishment; Wada, Shigeyuki

    1999-08-01

    The ISI (In-Service Inspection) system has been developed so as to maintain the structural integrity of heat transfer tubes in the primary pressurized water cooler in the HTTR (High Temperature Engineering Test Reactor). This system consists of eddy current probes, ultra-sonic probes, insertion and extraction units, positioning unit and so on. Verification and performance tests of the developed ISI system were carried out using mock-up heat transfer tubes in the primary pressurized water cooler. The constitution of the system, R and D results of the inspection probes, and verification and performance test results of the ISI system for heat transfer tubes are described in this paper. (author)

  18. Fuel channel in-service inspection programs program design for maximum cost effectiveness

    International Nuclear Information System (INIS)

    Van den Brekel, N.C.

    1995-01-01

    Inspection is an integral part of fuel channel life management strategy. Inspection data is used to assess the state of reactor core integrity and provide the information necessary to optimize long term maintenance programs. This paper will provide an overview of the structured approach to developing fuel channel inspection programs within OHN. The inspection programs are designed to balance the resources utilized (cost, outage time, and dose expenditure) with the benefits provided by the inspection data obtained (improved knowledge of component status, degradation mechanisms and rates, etc..). The CANDU community has yet to have a fuel channel operate for a full 30 year design life. Since research programs can not fully simulate reactor operating conditions, inspections become an essential feature of the life management strategy as the components age. Inspection programs often include activities designed to develop predictive capability for long term fuel channel behaviour and provide early warning of changes in behaviour. It should be noted that although this paper addresses the design of fuel channel inspection programs, the basic principles presented can be applied to the design of inspection programs for any major power plant component or system. (author)

  19. Design considerations, tooling and equipment for remote in-service inspection of radioactive piping and pressure vessel systems

    International Nuclear Information System (INIS)

    Schmoker, D.S.; Swannack, D.L.

    1983-01-01

    In-Service Inspection programs are performed to monitor and verify the integrity of a nuclear power plant's primary pressure boundaries. Early detection of abnormal structural or material degradation could preclude serious damage to plant systems. This paper summarizes results obtained in use of remotely-operated nondestructive testing (NDT) equipment for inspection of reactor system components. Experience obtained in operating the Fast Flux Test Facility (FFTF) has provided a basis for field verification of remote NDT equipment designs and has suggested development improvements. Remote Viewing and data gathering systems used include periscopes, borescopes, fiberscopes, hybrid borescopes/fiberscopes, and closed circuit television. A summary of design consideration for inspection equipment and power plant design is presented to achieve improved equipment operation and reduction of plant maintenance downtime

  20. Beliefs concerning the reliability of nuclear power plant in-service inspections; Uskomuksia ydinvoimalaitoksissa suoritettavien tarkastusten luotettavuudesta

    Energy Technology Data Exchange (ETDEWEB)

    Kettunen, J. [VTT Automation, Espoo (Finland)

    1997-01-01

    The aim of the study was to investigate belief systems held by the officials responsible for the planning and supervision of NDT operations within the Finnish nuclear industry. They were asked to express their opinions on (1) the reliability of NDT methods in general, (2) the factors influencing the reliability of in-service inspections, and (3) the degree of reliability of the current inspections operations conducted by means of NDT methods in the Finnish nuclear power plants. Another goal of the study was to assess the adequacy of officials` beliefs (or belief systems). The research data was collected by interviewing representatives from Finnish power companies (Imatran Voima Oy and Teollisuuden Voima Oy), independent inspection organisations, and the Finnish Centre for Radiation and Nuclear Safety (STUK). The adequacy of the beliefs expressed was assessed by means of the results obtained from international NDT reliability studies and on the basis of interviewees` own justification. (refs.).

  1. Automatic ultrasonic pre-service, and in-service inspection of pressurized components of the primary circuit of nuclear power stations

    International Nuclear Information System (INIS)

    Muller, G.P.; Hallermeier, L.; Heinrich, D.; Grabendorfer, W.; Rebrmann, M.

    1985-01-01

    Ultrasonic pre-service and especially in-service inspection activities on the primary circuit of nuclear power stations form an essential part of the maintenance work that must be performed throughout the lifetime to ensure plant integrity. Consequently, the equipment required to carry out these inspections must be continuously improved in respect of reliability, safety, accuracy and ease of handling in order to minimize disturbances and repairs and reduce radiation exposure of the personnel. The authors' discussion of technique, equipment and performance of automated ultrasonic inspection is based on 15 years of experience in the testing of components of the primary circuit in nuclear power stations. To cover all inspection areas of the RPV of a PWR, four different manipulators are required, two for the closure head, one for the studs and one for the cylindrical shell and bottom closure. The use of the newly developed equipment, which naturally meets all the recommendations of the licensing authorities, allows for the automatic inspection of the components of primary circuit of nuclear power stations and the thus helps to substantially decrease the radiation exposure of the personnel. All the manipulators and their control consoles were designed and manufactured by M.A.N., Nuremberg while the ultrasonic electronic system was developed by Krautkramer, Cologne

  2. Use of remote visual in-service inspection on nuclear power plants of the CEGB

    International Nuclear Information System (INIS)

    James, D.W.

    1985-01-01

    The main responsibility of the Remote Inspection Group is the design, development and procurement of the remote visual inspection equipment provided by the Generation Development and Construction Division as part of the extent of the supply for all the Central Electricity Generating Board's (CEGB) advanced gas-cooled reactors (AGR). The paper describes the operation of this equipment, together with the low light-level TV cameras that have been developed for carrying out routine remote visual inspections. The camera, known as the television remote inspection unit multi-purpose head (TRIUMPH), has been designed as a series of modules. With this system it is possible to take advantage of improvements in a particular part of the camera system and to arrange to backfit an improved module to existing TRIUMPHs. To minimize the time for carrying out routine inspections during shutdown, the AGRs have been provided with storage training and test facilities. These facilities are provided with full size mock-ups of the reactor internals so that the inspection equipment can be tested and the operating staff trained before the equipment is used on the reactor. One of the other responsibilities of the Remote Inspection Group is to carry out specific power plant remote visual inspections which are required to minimize costly plant shutdowns and construction delays. Examples are given of successful inspections that have been carried out. Over 12 years' experience has now been obtained in carrying out, at short notice, difficult inspections which involve tortuous access routes. The CEGB now holds a wide range of fibrescope and small TV cameras, together with the equipment for placing the viewing device in the correct location. A number of special fibrescopes have been developed for specific inspection needs and details of these, together with other fibrescopes owned by the CEGB, are provided. (author)

  3. In-service inspection of electronics components, circuits and nuclear radiation detectors

    International Nuclear Information System (INIS)

    Darbhe, M.D.

    2002-01-01

    A nuclear reactor is a complex process plant. Like a nuclear power plant, the research reactors also employ various nuclear and process systems, the scope and number of such systems being plant-specific. In-service inspection of these systems is an important requirement and is applied at various levels of their constituent units such as detectors, electronics components, circuits and integrated systems. The sensors used cover a wide range such as neutronic, radiation, process (pressure, temperature, flow, level) and many others. The present discussion is limited to neutronic and radiation detectors. The electronic components used normally consist of passive components like resistors, capacitors, semiconductor components like diodes, transistors, analog integrated circuits and digital integrated circuits and electromagnetic relays, to name a few. In order to have a comprehensive surveillance and ISI plan, over the entire plant life, it is necessary to understand various mechanisms, which degrade the performance of these systems. These are discussed initially and later various ISI methods that are used on component-circuit or system level, to ensure optimum system performance, are discussed. The computerised systems, because of hardware and software considerations, have to be given special attention, and the same are discussed briefly

  4. Ultrasonic inspection

    International Nuclear Information System (INIS)

    Satittada, Gannaga

    1984-01-01

    Ultrasonic inspection is one of the most widely used methods for nondestructive inspection. The beam of high-frequency sound wave, ultrasonic wave, is introduced into the material. It travels through the material with some attendant loss of energy and can be reflected at interfaces. The reflected beam is detected and analyzed. Ultrasonic inspection is used to detect flaws in metal parts as well as in welded, brazed and bonded joints during research work and developing production and service. It is also used to detect and locate porosity, pipe, and flakes. In addition, it can be used for the measurement of metal thickness. Ultrasonic inspection is therefore used for quality control and material inspection in all major industries

  5. Official CERN holidays | Restaurant opening hours

    CERN Multimedia

    2013-01-01

    Please note that the CERN Restaurants will have the following opening hours during the upcoming holidays: Restaurant #1 will be open from 7 a.m. to 11 p.m. on Wednesday 1 May, Thursday 9 May (Ascension Thursday) and Monday 20 May (Pentecost) - on Friday 10 May the restaurant will be open at the usual times. Restaurant #2 will be closed over the 3 official CERN holidays, but will be open on Friday 10 May at the usual times (brasserie will be closed). Restaurant #3 will be closed over the 3 official CERN holidays, as well as Friday 10 May.

  6. X-ray tomographic in-service inspection of girth welds - The European project TomoWELD

    Energy Technology Data Exchange (ETDEWEB)

    Ewert, Uwe, E-mail: uwe.ewert@bam.de; Redmer, Bernhard, E-mail: uwe.ewert@bam.de; Walter, David, E-mail: uwe.ewert@bam.de; Thiessenhusen, Kai-Uwe, E-mail: uwe.ewert@bam.de; Bellon, Carsten, E-mail: uwe.ewert@bam.de [BAM Bundesanstalt für Materialforschung, Berlin (Germany); Nicholson, P. Ian, E-mail: ian.nicholson@twi.co.uk [TWI Technology Centre Wales, Port Talbot (United Kingdom); Clarke, Alan L. [TWI Technology Centre Wales, Port Talbot (United Kingdom); Finke-Härkönen, Klaus-Peter, E-mail: klaus.harkonen@ajat.fi [Oy AJAT Ltd., Helsinki (Finland)

    2015-03-31

    The new standard 'ISO 17636-2:2013: Non-destructive testing of welds - Radiographic testing - Part 2: X- and gamma-ray techniques with digital detectors', defines the practice for radiographic inspection of welded pipes for manufacturing and in-service inspection. It is applied in Europe for inspections of pipe welds in nuclear power plants as well as in chemical plants and allows a faster inspection with digital detector arrays (DDA) than with film. Nevertheless, it does not allow the evaluation of the depth and shape of volumetric and planar indications. In 2001 a planar tomography scanner, TomoCAR, was introduced for mechanized radiographic testing (RT) inspection and non-destructive measurement of cross sections. The project TomoWELD is based on a new concept of the scan geometry, an enhanced GPU based reconstruction, and the application of a new generation of photon counting DDAs based on CdTe crystal CMOS hybrids. The new detector permits the selection of energy thresholds to obtain an optimum energy range and reduction of the influence of scattered radiation. The concept and first measurements are presented. Flaw depth and shape of volumetric and planar irregularities can be determined.

  7. X-ray tomographic in-service inspection of girth welds - The European project TomoWELD

    International Nuclear Information System (INIS)

    Ewert, Uwe; Redmer, Bernhard; Walter, David; Thiessenhusen, Kai-Uwe; Bellon, Carsten; Nicholson, P. Ian; Clarke, Alan L.; Finke-Härkönen, Klaus-Peter

    2015-01-01

    The new standard 'ISO 17636-2:2013: Non-destructive testing of welds - Radiographic testing - Part 2: X- and gamma-ray techniques with digital detectors', defines the practice for radiographic inspection of welded pipes for manufacturing and in-service inspection. It is applied in Europe for inspections of pipe welds in nuclear power plants as well as in chemical plants and allows a faster inspection with digital detector arrays (DDA) than with film. Nevertheless, it does not allow the evaluation of the depth and shape of volumetric and planar indications. In 2001 a planar tomography scanner, TomoCAR, was introduced for mechanized radiographic testing (RT) inspection and non-destructive measurement of cross sections. The project TomoWELD is based on a new concept of the scan geometry, an enhanced GPU based reconstruction, and the application of a new generation of photon counting DDAs based on CdTe crystal CMOS hybrids. The new detector permits the selection of energy thresholds to obtain an optimum energy range and reduction of the influence of scattered radiation. The concept and first measurements are presented. Flaw depth and shape of volumetric and planar irregularities can be determined

  8. Discussion of in-service inspection planning for nuclear power plants

    International Nuclear Information System (INIS)

    Aoki, Takayuki; Takagi, Toshiyuki

    2012-01-01

    For creating an inspection plan for industrial plants like nuclear power plants, it is necessary to have a well-grounded basis. Therefore, this paper proposes a method for determining the following three elements of such a plan: the equipment to be inspected, the inspection method to be adopted, and the timing of its implementation using a scientific approach. The key idea is to analyze the components of the plan by employing the understanding of cancer detection and diagnosis in medical science and also to take an approach of creating a plan based on the characteristic features of the component and its aging degradation mode, the performance of the inspection method, and the relationship between the two. Taking all the above into account, the factors to be considered and the best way for inspecting the plants are presented in this paper. (author)

  9. Holiday Door Decorating Contest Brings Cheer | Poster

    Science.gov (United States)

    By Carolynne Keenan, Contributing Writer Other than the time of year, what do the following have in common: the leg lamp from the movie “A Christmas Story,” a compilation of silly holiday jokes, a gingerbread house, and Santa on a motorcycle? All four were among the individual door winners for the Holiday Door Decorating Contest, held at NCI at Frederick in December. Employees dressed up their office doors, hallways, and even stairwells to participate. Entries for the contest included individual office doors as well as groups. Some employees even “decked the halls” of whole office buildings to participate.

  10. An international survey of in-service inspection experience with prestressed concrete pressure vessels and containments for nuclear reactors

    International Nuclear Information System (INIS)

    1982-04-01

    An international survey is presented of experience obtained from the in-service surveillance of prestressed concrete pressure vessels and containments for nuclear reactors. Some information on other prestressed concrete structures is also given. Experience has been gained during the working life of such structures in Western Europe and the USA over the years since 1967. For each country a summary is given of the nuclear programme, national standards and Codes of Practice, and the detailed in-service inspection programme. Reports are then given of the actual experience obtained from the inspection programme and the methods of measurement, examination and reporting employed in each country. A comprehensive bibliography of over 100 references is included. The appendices contain information on nuclear power stations which are operating, under construction or planned worldwide and which employ either prestressed concrete pressure vessels or containments. (U.K.)

  11. The 12 Ways to Health Holiday Song

    Centers for Disease Control (CDC) Podcasts

    2007-12-14

    This song (sung to the tune of The Twelve Days of Christmas) describes how to stay safe and healthy during the holidays and all year long.  Created: 12/14/2007 by CDC Office of Women's Health.   Date Released: 12/23/2007.

  12. How Do We Resolve Holiday Problems?

    Institute of Scientific and Technical Information of China (English)

    2011-01-01

    Chinese Ministry of Railways statistics show that from September 28 to October 7,the National Day Holiday period,China’s railway networks were used for 67 million trips,an all-time high.On October 1 alone,8.9 million trips

  13. Program for establishing long-time flight service performance of composite materials in the center wing structure of C-130 aircraft. Phase 5: flight service and inspection. Final report

    International Nuclear Information System (INIS)

    Kizer, J.A.

    1981-10-01

    Inspections of the C-130 composite-reinforced center wings were conducted over the flight service monitoring period of more than six years. Twelve inspections were conducted on each of the two C-130H airplanes having composite reinforced center wing boxes. Each inspection consisted of visual and ultrasonic inspection of the selective boron-epoxy reinforced center wings which included the inspection of the boron-epoxy laminates and the boron-epoxy reinforcement/aluminum structure adhesive bondlines. During the flight service monitoring period, the two C-130H aircraft accumulated more than 10,000 flight hours and no defects were detected in the inspections over this period. The successful performance of the C-130H aircraft with composite-reinforced center wings allowed the transfer of the responsibilities of inspecting and maintaining these two aircraft to the U. S. Air Force

  14. RIBA Project - Risk-Informed approach for In-Service Inspection of Nuclear Power Plant Components. Project summary

    International Nuclear Information System (INIS)

    Lidbury, D.; Smith, G.

    2001-12-01

    The need for a European review of a Risk-Informed Approach for In-Service Inspection of Nuclear Power Plant Components (RIBA) was identified in 1998. This was as a priority item in the programme of activities conducted in the framework of the Council Resolutions of 22 July 1975 and of 18 June 1992 on the Technological Problems of Nuclear Safety. The RIBA Project was established in November 1999 as a 24-month Study Contract funded by the European Commission within the frame of the former DG XI WGCS (Working Group on Codes and Standards). The Study Contract was subsequently managed for the EC by DG TREN. The participants in RIBA were Serco Assurance (project coordinator), Ringhals AB, EDF, Tecnatom SA and Westinghouse Electric Europe. The work is presented in a summary report with the detailed results contained in three companion reports as follows: main conclusions and recommendations, Review of Existing Risk-Informed Methodologies, A Comparative Study of Risk-Informed In-Service Inspection Applications, Conclusions and Recommendations for Risk-Informed in-service inspection methodology applied to Nuclear Power Plants in Europe. (author)

  15. Development of automated ultrasonic device for in-service inspection of ABWR pressure vessel bottom head

    International Nuclear Information System (INIS)

    Kojima, Y.; Matsuyama, A.

    1995-01-01

    An automated device and its controller have been developed for the bottom head weld examination of pressure vessel of Advanced Boiling Water Reactor (ABWR). The internal pump casings and the housings of control rod prevent a conventional ultrasonic device from scanning the required inspection zone. With this reason, it is required to develop a new device to examine the bottom head area of ABWR. The developed device is characterized by the following features. (1) Composed of a mother vehicle and a compact inspection vehicle. They are connected only by an electric wire without using the conventional arm mechanism. (2) The mother vehicle travels on a track and lift up the inspection vehicle to the vessel. (3) The mother vehicle can automatically attach the inspection vehicle to the bottom head, and detach the inspection vehicle from it. (4) Collision avoidance control function with a touch sensor is installed at the front of the inspection vehicle. The device was successfully demonstrated using a mock-up of reactor pressure vessel

  16. Holiday ornament-related injuries in children.

    Science.gov (United States)

    Kimia, Amir; Lee, Lois; Shannon, Michael; Capraro, Andrew; Mays, Donald; Johnston, Patrick; Hummel, David; Shuman, Margot

    2009-12-01

    Holiday ornament injuries in children have not been well documented in the medical literature. Our aim was to investigate the patterns of injuries sustained from these ornaments as a first measure toward prevention. This was a retrospective cohort analysis of all patients examined in an urban pediatric emergency department over a 13-year period ending in March 2008 for holiday ornament-related injuries. Cases were identified using a computer-assisted text query followed by a manual chart review. Data collected from each chart included the child's age, sex, injury characteristics, physical examination findings, radiographic imaging, interventions, and disposition. To analyze injury rates over the years, we used a multiplicative Poisson model allowing varying exposures. Over the study period, we identified 76 eligible patients. The median age was 2 years (interquartile range, 1.17-3.3 years); 44.7% were female. Forty-three of the 76 cases (53.9%) involved ingestions: 35 were of holiday ornaments, and 8 were of light bulbs. All but one of these ornaments were made of glass. In 28%, there was an associated bleed either from the mouth or as a delayed gastrointestinal bleed. Other patients experienced lacerations (27.6%), eye injuries (5.1%), and minor electrocution injury (2.5%). Imaging was performed in 85%. A subspecialty consult was obtained in 23%, primarily addressing a foreign body ingestion or removal after skin exploration. The incidence rate has not changed over the years. Holiday ornament-related injuries primarily involve foreign body ingestions and glass-related injuries. Over half of the injuries involved small light bulbs and ornaments made of glass placed at the level a toddler can reach. Pediatricians are advised to discuss these points with families during holiday season.

  17. EXPLORING TAX HOLIDAY POLICY IMPLEMENTATION FOR INDONESIAN INVESTMENT CLIMATE: HAS IT BEEN EFFECTIVE?

    Directory of Open Access Journals (Sweden)

    Mulyono R.D.P.

    2017-07-01

    Full Text Available This study aims to explore the reasons for the ineffectiveness of tax holiday policy implementation in Indonesia as well as the government’s strategies to improve the investment climate. This research uses exploratory study type which does not test theory or hypothesis by using preliminary survey method, conducting direct or indirect interview via e-mail to certain informant by giving questionnaire and direct observation passively observing the field and related websites supporting statistical data in this study in depth. In testing the validity of research data used source triangulation and method triangulation. The progress that has been achieved to date in the implementation of tax holiday policy is to provide ease of bureaucracy administration and simplicity of licensing services in investing by improving coordination among government to improve foreign investors' confidence when investing in Indonesia. So technically, the implementation of tax holiday policy is quite effective in attracting foreign direct investment because it can perform the right obligations according to the regulations. In the investment point of view, tax holiday policy is not effective in attracting foreign direct investment or not becoming the main factor of investor's goal in investment. The cause of the ineffectiveness of the tax holiday policy in attracting foreign direct investment in Indonesia is another indicator that becomes an assessment among others the ease of investment licensing, infrastructure, electricity supply, investor protection, minority and tax administration. Indonesian government's strategy to improve the investment climate is through deregulation, debureaucracy, law enforcement and business certainty for investors.

  18. The 1978 first in-service inspection of the reactor pressure vessel of the second unit of the Greifswald nuclear power plant

    International Nuclear Information System (INIS)

    Pastor, D.; Busch, R.; Hildebrandt, E.; Redlich, K.H.

    1979-01-01

    The reactor pressure vessel and the primary coolant circuit of the second 440-MW(e) unit of the Greifswald nuclear power plant were subjected to an in-service inspection. Extent of the inspection, development and construction of a reactor inspection container as well as the nondestructive materials testing methods used are described. Further, problems of performing the inspection, such as needs of time and personnel and radiation exposure, are considered. Finally, it is stated that the reactor pressure vessel was in safe operating state. (author)

  19. Customer Satisfaction at the Hospitality Industry: Holiday Inn Helsinki-Vantaa Airport

    OpenAIRE

    Eld, Anna

    2015-01-01

    The intention of this Bachelor’s Degree thesis was to examine and observe the customer service and especially customer satisfaction in a hotel industry, and Holiday Inn Helsinki-Vantaa Airport was selected to be an example for this survey. This survey and thesis is carried out by the author in collaboration with Holiday Inn Helsinki-Vantaa Airport, which was the commissioner of this Bachelor’s Degree thesis. This hotel was chosen since the author of this thesis did her second internship there...

  20. Application of risk-informed in-service inspection approach. Pilot study on low pressure emergency core cooling system of NPP Temelin

    International Nuclear Information System (INIS)

    Horacek, L.; Palyza, J.; Zdarek, J.; Vizina, M.

    2004-01-01

    In-service inspection (ISI) programme of piping systems based on Riskinformed In-service Inspections (RI-ISI) approach represents for the WWER NPP licensee first overall systematic conceptual solution of the problems associated with design and design modifications of ISI programme for piping systems. The approach enables to consider possible savings and comparison of in-service inspection programmes according to more objective criteria including those calculated in PSA, in contrast to present much empiric experience collected by manufacturers, operators and ISI vendors in the past. Service experience has shown limited correlation between the deterministic ISI requirements and actual field failures or degradation mechanisms. Where field failures have been observed in piping, they have generally been due to either material concerns (e.g., Intergranular Stress Corrosion Cracking) or stress/cycling mechanisms not identified in the original design basis documents (e.g., thermal stratification), and therefore would not be selected for inspection under current requirements. Risk-informed in-service inspections represent integrated multidisciplinary approach to the in-service inspection programme fulfilling the enhanced requirements of the Czech Regulatory Body (SUJB) for defence in depth concept applied to weld joints of safety related components, application of qualified NDT methods/techniques and introducing of inspections for cause approach. Inspections for cause take into account analysis of both active and potential degradation mechanisms specific to piping system concerned. Simultaneously, this approach enables the licensee to reach, in cases justified from safety point of view, economic savings resulting from lowering of both number and extent of performed in-service inspections and optimisation of their performance. RI ISI pilot study based in majority on EPRI methodology implemented for WWER type reactors has been performed for LP ECCS (Low Pressure Emergency

  1. Evaluation and improvement in nondestructive examination (NDE) reliability for in-service inspection of light water reactors

    International Nuclear Information System (INIS)

    Deffenbaugh, J.D.; Good, M.S.; Green, E.R.; Heasler, P.G.; Simonen, F.A.; Spanner, J.C.; Taylor, T.T.

    1988-01-01

    The evaluation and improvement of NDE Reliability for In-service Inspection (ISI) of Light Water Reactors (NDE Reliability) Program at Pacific Northwest Laboratory (PNL) was established to determine the reliability of current ISI techniques and to develop recommendations that will ensure a suitably high inspection reliability. The objectives of this NRC program are to: determine the reliability of ultrasonic ISI performed on commercial light-water reactor (LWR) primary systems; determine the impact of NDE unreliability on system safety and determine the level of inspection reliability required to ensure a suitably low failure probability using probabilistic fracture mechanics analysis; evaluate the degree of reliability improvement that could be achieved using improved and advanced NDE technique; and recommend revisions to ASME Code, Section XI, and Regulatory Requirements, based on material properties, service conditions, and NDE uncertainties, that will ensure suitably low failure probabilities. The program consists of three basic tasks: a Piping task, a Pressure Vessel task, and an Evaluation and Improvement in NDE Reliability task. The major efforts were concentrated in the Piping task and the Evaluation and Improvement in NDE Reliability task

  2. Structural features and in-service inspection of the LTHR-200 pressure vessel

    International Nuclear Information System (INIS)

    Xiong Dunshi; He Shuyan; Liu Junjie; Yu Suyuan

    1993-01-01

    LTHR-200 is a low temperature district-heating reactor. It adopts double-shell design pressure vessel and metal containment. Because of the safety and structural features of the reactor, the in-service inspection of the pressure vessel can be simplified greatly. LTHR-200 is an integrated arrangement. Both its core components and the main heat exchangers are contained in the reactor pressure vessel. The coolant of the main loop is run by a full-power natural circulation and there need no main pumps and pipes. Thus, the reactor pressure vessel constitutes the pressure boundary of the reactor's main loop coolant. In regard to these features, a small-sized containment is designed for the reactor. The metal safety container with a small volume is placed closely around the reactor pressure vessel. Outside the metal containment, there is a large reinforced concrete construction for the reactor. Their main operation and design parameters are as follows: The pressure vessel: operation pressure = 2.4 MPa; design pressure = 3.0 MPa; design temperature = 250 deg C; 40 year fast neutron (E>1MeV) fluence in the belt-line region = < 10E16n/cm; internal diameter = 5000 mm; material SA516-70; shell thickness 65 mm; The metal containment: maximum operation pressure = 1.8 MPa; design pressure = 1.8 MPa; design temperature = 250 deg. C; upper internal diameter 7000 mm; lower internal diameter = 5600 mm; material = SA516-70; shell thickness, upper part = 80 mm; lower part = 50 mm. All penetrating pipes through the pressure vessel are located at the top penetration section of the shell. All the internal diameters of penetrating pipes are less than 50 mm. Inside and outside the metal containment wall respectively, isolating valves are connected to the reactor coolant pipe which passes through the containment. These two isolating valves use different driving methods. Every penetrating part of the reactor construction uses a proper form of structure according to safety requirements

  3. Proposals for in-service inspection and monitoring of selected components located within or part of the primary containment of sodium cooled fast reactors

    International Nuclear Information System (INIS)

    Bolt, P.R.

    1976-01-01

    Design and operational experience of CEGB gas cooled reactors and certain overseas reactor plant is reviewed in relation to in-service inspection and monitoring capabilities. Design guidelines and preliminary proposals are given for in-service inspection and monitoring of selected components located within or part of the primary containment of sodium cooled fast reactors. Specific comments are made on the items of further design and development work believed to be necessary

  4. Restaurant closures during holiday period

    CERN Multimedia

    2015-01-01

    CERN restaurant opening times on Friday, 1 May: Restaurant No. 1 will be opened from 7.00 a.m. to 10.00 p.m. Restaurants No. 2 and No. 3 will be closed.   CERN restaurant opening times during the Ascension weekend: Restaurant No. 1 will be open from 7.00 a.m. to 10.00 p.m. on Thursday, 14 and Friday 15 May. Restaurant No. 2 will be closed on Thursday, 14 May and open on Friday, 15 May until 3.30 p.m. (no table service). Restaurant No. 3 will be closed.   CERN restaurant opening times on Whit Monday, 25 May: Restaurant No. 1 will be open from 7.00 a.m. to 10.00 p.m. Restaurants No. 2 and No. 3 will be closed.

  5. 77 FR 66578 - Cancellation of Indianapolis Grain Inspection & Weighing Service, Inc. Designation; Selection of...

    Science.gov (United States)

    2012-11-06

    ... Stockyards Administration, USDA. ACTION: Notice; correction. SUMMARY: The USDA, Grain Inspection, Packers and Stockyards Administration published a document in the Federal Register on October 31, 2012, concerning... Stockyards Administration. [FR Doc. 2012-27079 Filed 11-5-12; 8:45 am] BILLING CODE 3410-KD-P ...

  6. 7 CFR 2.80 - Administrator, Animal and Plant Health Inspection Service.

    Science.gov (United States)

    2010-01-01

    ... Meat Inspection Act, as amended, as it pertains to the issuance of certificates of condition of live... U.S.C. 2131-2159). (7) Horse Protection Act (15 U.S.C. 1821-1831). (8) 28 Hour Law, as amended (49 U... following: (i) Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act, as...

  7. Special Engineering Services to Establish Inspection Criteria for Bearings to Improve Life Prediction.

    Science.gov (United States)

    1979-12-01

    ll i . -- II 53 I V. REFERENCES 1. Barton, J. R., "Early Fatigue Damage Detection in 4140 Steel Tubes", Proc. Fifth Annual Symposium on NDE of...34Advanced Non- destructive Testing Methods for Bearing Inspection", SAE Paper No. 720172, Automotive Engineering Congress, Detroit, Michigan, January

  8. Ageing Management Programme: An Experience of In-Service Inspection of the Kartini Heat Exchanger

    Energy Technology Data Exchange (ETDEWEB)

    Nitiswati, S., E-mail: nitis@batan.go.id [Centre for Reactor Technology and Nuclear Safety, National Nuclear Energy Agency (BATAN), Jakarta (Indonesia); Syarip,; Tjiptono, T.; Wantana, [Centre for Accelerator and Material Process Technology, National Nuclear Energy Agency (BATAN), Yogyakarta (Indonesia)

    2014-08-15

    This paper discusses an experience on ISI of the Kartini reactor heat exchanger, as part of the implementation of an ageing management programme. Kartini reactor is located in Yogyakarta, Indonesia. The heat exchanger was constructed for 250 kW capacity. The type of heat exchanger is shell with tube recirculation. Tube material is stainless steel 304, and the shell and baffle plate materials are carbon steel. The heat exchanger has 72 tubes, its outer and inner diameters respectively are 19 and 16 mm, and tube thickness is 1.5 mm. The aim of ISI was to obtain and evaluate the heat exchanger’s condition including the detection of any possible local tube thinning, pitting corrosion or gradual thinning, and determine whether any degradation or deterioration of the heat exchanger could have a significant impact to safety. The heat exchanger was inspected utilizing eddy current equipment in 2003 and 2006. Inspection results in 2003 determined that 12 heat exchanger tubes have a thinning degradation level ranging from 10% up to 60% of the outer diameter due to pitting corrosion. Deterioration of baffle plates has been linked to general corrosion attack. Inspection results in 2006 showed a consistent thinning degradation level with the previous inspection in 2003. So far heat exchanger performance is still satisfactory, as defined by the transfer of primary heat for a 2°C difference between inlet and outlet as required. (author)

  9. Pre-service inspection program of the Block 1 of the Juragua NPP

    International Nuclear Information System (INIS)

    Mirabal Monteagudo, Juan de Dios

    1996-01-01

    The present work intends to explain the importance of a inspection program from pre-development of the components the stage submitted to pressure based on the existing regulation in the country and the information delivered by the manufacturers and this is compared with the requirements of the similar regulation adopted in the other western countries

  10. Electrochemical corrosion behavior of carbon steel with bulk coating holidays

    Institute of Scientific and Technical Information of China (English)

    2006-01-01

    With epoxy coal tar as the coating material, the electrochemical corrosion behavior of Q235 with different kinds of bulk coating holidays has been investigated with EIS (Electrochemical Impedance Spectroscopy) in a 3.5vol% NaCl aqueous solution.The area ratio of bulk coating holiday to total coating area of steel is 4.91%. The experimental results showed that at free corrosionpotential, the corrosion of carbon steel with disbonded coating holiday is heavier than that with broken holiday and disbonded & broken holiday with time; Moreover, the effectiveness of Cathodic Protection (CP) of carbon steel with broken holiday is better than that with disbonded holiday and disbonded & broken holiday on CP potential -850 mV (vs CSE). Further analysis indicated that the two main reasons for corrosion are electrolyte solution slowly penetrating the coating, and crevice corrosion at steel/coating interface near holidays. The ratio of impedance amplitude (Z) of different frequency to minimum frequency is defined as K value. The change rate of K with frequency is related to the type of coating holiday.

  11. In-service inspection of the vessels of nuclear submarine reactors

    International Nuclear Information System (INIS)

    Saglio, R.; Mercier L'Abbe, G.

    1977-02-01

    Description is given of a machine of automatic inspection of the reactor vessels of nuclear submarines, that was developed by the French Atomic Energy Commission (CEA). A focused ultrasound testing method is used. The equipment such described meets the safety requirements prescribed for the primary circuits of nuclear submarine boiler plants. The sensitivity and resolution power of the apparatus allow such high precision to be obtained as rupture mechanics gains a credibility that could not have been obtained with using conventional apparatus [fr

  12. Application of phased arrays in basic and in-service inspection

    International Nuclear Information System (INIS)

    Gebhardt, W.; Schwarz, H.P.; Bonitz, F.; Woll, H.

    1985-01-01

    In the scope of the reactor safety research program of the Federal Ministry of Research and Technology a flexible microcomputer controlled phased array system was developed. Meanwhile, several industrial prototypes for simple and complicated applications are built up. The applicability of phased array systems in NDE for basic and inservice inspections of reactor pressure vessels is investigated. Methods for defect detection, reconstruction and classification are described

  13. Automation of eddy current system for in-service inspection of turbine and generator bores

    International Nuclear Information System (INIS)

    Viertl, J.R.M.

    1988-01-01

    The most commonly applied inspection method for ferromagnetic turbine and generator rotor bores is the magnetic particle test technique. This method is subjective, depends on the test operator's skill and diligence in identifying test indications, and suffers from poor repeatability, especially for small indications. Automation would improve repeatability. However, magnetic particle tests are not easily automated, because the data are in the form of sketches, photographs, and written and oral descriptions of the indications. Eddy current inspection has obvious potential to replace magnetic particle methods in this application. Eddy current tests can be readily automated, as the data are in the form of voltages that can be recorded, digitized, and manipulated by a computer. The current project continues the investigation of the correlation between eddy current and magnetic particle inspection. Two systems have been combined to acquire eddy current data automatically. This combination of systems consists of the Nortec-25L Eddyscope (to provide the analog eddy current signals) and the General Electric DATAQ (TM) System (to perform the automatic data acquisition). The automation of the system is discussed

  14. The influence of school holiday timing on epidemic impact.

    Science.gov (United States)

    Eames, K T D

    2014-09-01

    The impact of reactive school closure on an epidemic is uncertain, since it is not clear how an unplanned closure will affect social mixing patterns. The effect of school holidays on social mixing patterns is better understood. Here, we use mathematical models to explore the influence of the timing of school holidays on the final size and peak incidence of an influenza-like epidemic. A well-timed holiday can reduce the impact of an epidemic, in particular substantially reducing an epidemic's peak. Final size and peak incidence cannot both be minimized: a later holiday is optimal for minimizing the final size, while an earlier holiday minimizes peak incidence. Using social mixing data from the UK, we estimated that, had the 2009 influenza epidemic not been interrupted by the school summer holidays, the final size would have been about 20% larger and the peak about 170% higher.

  15. Healthcare and a holiday: the risks of LASIK tourism.

    Science.gov (United States)

    Lockington, David; Johnson, Richard; Patel, Dipika V; McGhee, Charles N J

    2014-07-01

    Medical tourism is the practice of travelling overseas for surgery. We describe a patient with low myopia who underwent laser in situ keratomileusis (LASIK) while on holiday in India. She presented to local hospital eye services six weeks post-LASIK with discomfort and reduced vision. She reported three previous LASIK flap lifts in the right eye. Clinical assessment, optical coherence tomography and confocal microscopy demonstrated moderate epithelial ingrowth and reduced visual acuity. Epithelial ingrowth after LASIK may be associated with visual impairment and management is determined by location, magnitude and effect on vision. LASIK tourism may mean patients are less well-informed of risks and lose continuity of professional care. © 2013 The Authors. Clinical and Experimental Optometry © 2013 Optometrists Association Australia.

  16. Some reliability targets affecting the necessary provisions for in-service inspection and monitoring of LMFBR engineering components

    International Nuclear Information System (INIS)

    Bolt, P.R.

    1980-01-01

    The possible consequences of failure of primary and secondary sodium circuit components are discussed with particular reference to post incident fault diagnosis, remedial procedures and outage durations. The core support structures and steam generator units are identified as particularly important components in terms of economic consequence of their failure. Important safety considerations may also apply. Levels of reliability for core support and steam generator integrity, necessary to meet economic and certain safety criteria, are discussed and quantitative data is given. Possible failure and deterioration mechanisms which could result in unacceptable reductions in reliability are then identified for the core support and steam generator units. Following a consideration of the reliability targets and possible causes of loss of reliability, an appraisal is made of the necessary extent of in-service data to be obtained on component behaviour and condition. In-service inspection and monitoring methods that could be used to obtain this data are described. Consideration is given to UK and overseas inspection experience on LMFBR and other nuclear plant. (author)

  17. Some reliability targets affecting the necessary provisions for in-service inspection and monitoring of LMFBR engineering components

    Energy Technology Data Exchange (ETDEWEB)

    Bolt, P R [Fast Reactor Engineering, Plant Engineering Department, CEGB, Barnwood, Gloucester (United Kingdom)

    1980-11-01

    The possible consequences of failure of primary and secondary sodium circuit components are discussed with particular reference to post incident fault diagnosis, remedial procedures and outage durations. The core support structures and steam generator units are identified as particularly important components in terms of economic consequence of their failure. Important safety considerations may also apply. Levels of reliability for core support and steam generator integrity, necessary to meet economic and certain safety criteria, are discussed and quantitative data is given. Possible failure and deterioration mechanisms which could result in unacceptable reductions in reliability are then identified for the core support and steam generator units. Following a consideration of the reliability targets and possible causes of loss of reliability, an appraisal is made of the necessary extent of in-service data to be obtained on component behaviour and condition. In-service inspection and monitoring methods that could be used to obtain this data are described. Consideration is given to UK and overseas inspection experience on LMFBR and other nuclear plant. (author)

  18. Is a Change As Good As a Holiday?

    Institute of Scientific and Technical Information of China (English)

    2007-01-01

    Chinese citizens could see a change in their holiday struc- ture from early 2008,if a recent proposal gets the nod from the State Council. A survey conducted by the National Development and Reform Commission asking for public feedback on a proposed change to China’s constitutional holiday system,resulted in a massive 80 percent of 1.55 million netizens responding positively to the suggestion of an annual scheme of 11 holiday days.

  19. Educational Psychology in Scotland: Making a Difference. An Aspect Report on the Findings of Inspections of Local Authority Educational Psychology Services 2006-10

    Science.gov (United States)

    Her Majesty's Inspectorate of Education, 2011

    2011-01-01

    This report provides, for the first time, an overview based on inspections of all 32 local authority educational psychology services. The picture it presents is broadly a very positive one although it also points to areas in which there is certainly scope for further improvement. The report shows that services are making a positive difference to…

  20. Holiday homes - electric power savings; Sommerhuse - elbesparelser her og nu

    Energy Technology Data Exchange (ETDEWEB)

    Kofoed Esbensen, N -U; Roed Rasmussen, E [Esbensen Raadgivende Ingenioerer A/S, Copenhagen (Denmark); Weldingh, P [Lokalenergi, Viby J. (Denmark); Worm, J; Adams Rasmussen, L [Energitjenesten, Aarhus (Denmark); Reuss, M [Elsparefonden, Copenhagen (Denmark); Ellehauge, K; Kjaergaard, C -J [Ellehauge og Kildemoes, Aarhus (Denmark); Jensen, Ole Michael [Aalborg Univ. SBi, Aalborg (Denmark)

    2010-09-15

    A questionnaire survey among 700 holiday home owners was conducted and followed up by interviews with representatives of typical groups of holiday home owners and a number of key persons representing rental, building, electricity supply, regulatory processing and supply of renewable energy facilities to holiday homes. The results of the questionnaire survey and of former surveys on technical savings potential are included in an easy-to-read catalogue of ideas with directions and recommendations for various groups of holiday home users and players. The recommendations are grouped into eight topics of more or less relevance for the various target groups. (LN)

  1. Application of non-destructive testing and in-service inspections to research reactors and preparation of ISI programme and manual for WWR-C research reactors

    International Nuclear Information System (INIS)

    Khattab, M.

    1996-01-01

    The present report gives a review on the results of application of non-destructive testing and in-service inspections to WWR-C reactors in different countries. The major problems related to reactor safety and the procedure of inspection techniques are investigated to collect the experience gained from this type of reactors. Exchangeable experience in solving common problems in similar reactors play an important role in the effectiveness of their rehabilitation programmes. 9 figs., 4 tabs

  2. The effect of holiday haemodialysis treatments on patient mood, adverse symptoms and subjective wellbeing using the Big Red Kidney Bus.

    Science.gov (United States)

    Sims, Jane; Bennett, Paul N; Ockerby, Cherene; Ludlow, Marie; Fairbairn, Jo; Wilson, Anne; Kerr, Peter G

    2017-02-01

    People with end-stage kidney disease receiving haemodialysis are restricted to holidays where dialysis services are readily available. Holiday dialysis in regional, rural and remote areas is particularly challenging. The aims of this study were to evaluate the wellbeing of those who received dialysis in a holiday haemodialysis bus and to measure patient well-being with that of a comparable cohort of haemodialysis patients. A three machine haemodialysis bus, the Big Red Kidney Bus, was built to enable people, their families and carers to take holidays across a range of tourist destinations in Victoria, Australia. Measures included pre-post subjective well-being, dialysis symptoms and mood questionnaires complemented by post semi-structured telephone interviews. Participating holidaymakers were positive about the haemodialysis bus service and the standard of care experienced. They reported decreased dialysis side effects of fatigue, muscle cramp and dry skin. The overall number of reported symptoms decreased, and the perceived level of bother associated with symptoms also decreased. No changes in subjective well-being and mood were detected. Mean Personal Wellbeing Index scores were significantly higher than in a comparative haemodialysis sample. The Big Red Kidney Bus provided a safe and feasible holiday dialysis service. Holidaymakers' well-being was reflected by the decreased dialysis patient side effects. © 2016 Asian Pacific Society of Nephrology.

  3. Holidays – the Mirror of Society. The Social and Cultural Contexts of Present-Day Holidays in the Slovak Republic

    Directory of Open Access Journals (Sweden)

    Katarína Popelková

    2017-06-01

    Full Text Available After 2010, the study of present-day holidays established itself as an original tool for the study of society in Slovak ethnology. In the first stage, the research team of the Institute of Ethnology SAS focused on the empirical research of the specific contexts of the term holiday in Slovakia and mapped the range of situations which are designated by people as holidays today. The term holiday means the interruption of the daily routine, a moment commemorated on a cyclical basis or a period accompanied by normative or ritual acts and with an ascribed symbolic meaning. Our research showed that apart from identification, ritual and spiritual functions which are important for individuals or communities, as commonly studied by ethnology, holidays also fulfil a number of practical functions at present. After the discovery of the manifold overlaps of this phenomenon with the on-going social processes, the focus of ethnology has shifted to society as such and on its reflection in the mirror of holidays. Through an analysis of empirical materials from the observation and ethnographic description of the events in the public space during holidays, the study of the holiday legislation, the activities of various institutions the production of printed and electronic media, business and advertising, which create the current content and the ways of celebrating holidays, it was possible to obtain a basis for a specific testimony about the present-day social processes in the Slovak Republic. In this context, this study is dedicated to the following relations: holidays and politics, holidays and economy, and holidays and citizens.

  4. Tridimensional ultrasonic images analysis for the in service inspection of fast breeder reactors

    International Nuclear Information System (INIS)

    Dancre, M.

    1999-11-01

    Tridimensional image analysis provides a set of methods for the intelligent extraction of information in order to visualize, recognize or inspect objects in volumetric images. In this field of research, we are interested in algorithmic and methodological aspects to extract surface visual information embedded in volume ultrasonic images. The aim is to help a non-acoustician operator, possibly the system itself, to inspect surfaces of vessel and internals in Fast Breeder Reactors (FBR). Those surfaces are immersed in liquid metal, what justifies the ultrasonic technology choice. We expose firstly a state of the art on the visualization of volume ultrasonic images, the methods of noise analysis, the geometrical modelling for surface analysis and finally curves and surfaces matching. These four points are then inserted in a global analysis strategy that relies on an acoustical analysis (echoes recognition), an object analysis (object recognition and reconstruction) and a surface analysis (surface defects detection). Few literature can be found on ultrasonic echoes recognition through image analysis. We suggest an original method that can be generalized to all images with structured and non-structured noise. From a technical point of view, this methodology applied to echoes recognition turns out to be a cooperative approach between morphological mathematics and snakes (active contours). An entropy maximization technique is required for volumetric data binarization. (author)

  5. Holiday Heart Syndrome Revisited after 34 Years

    Energy Technology Data Exchange (ETDEWEB)

    Tonelo, David [Faculty of Medicine, University of Coimbra, Coimbra (Portugal); Providência, Rui, E-mail: rui-providencia@yahoo.com; Gonçalves, Lino [Faculty of Medicine, University of Coimbra, Coimbra (Portugal); Coimbras Hospital Centre and University, Coimbra (Portugal)

    2013-01-01

    The cardiovascular effects of alcohol are well known. However, most research has focused on the beneficial effects (the 'French paradox') of moderate consumption or the harmful consequences, such as dilated cardiomyopathy, associated with heavy consumption over an extended period. An association between the ingestion of acute alcohol and onset of cardiac arrhythmias was first reported in the early 70's. In 1978, Philip Ettinger described 'Holiday heart syndrome' (HHS) for the first time, as the occurrence, in healthy people without heart disease known to cause arrhythmia, of an acute cardiac rhythm disturbance, most frequently atrial fibrillation, after binge drinking. The name is derived from the fact that episodes were initially observed more frequently after weekends or public holidays. Since the original description of HHS, 34 years have passed and new research in this field has increased the volume of knowledge related to this syndrome. Throughout this paper the authors will comprehensively review most of the available data concerning HHS and highlight the questions that remain unresolved.

  6. Holiday heart syndrome revisited after 34 years.

    Science.gov (United States)

    Tonelo, David; Providência, Rui; Gonçalves, Lino

    2013-08-01

    The cardiovascular effects of alcohol are well known. However, most research has focused on the beneficial effects (the "French paradox") of moderate consumption or the harmful consequences, such as dilated cardiomyopathy, associated with heavy consumption over an extended period. An association between the ingestion of acute alcohol and onset of cardiac arrhythmias was first reported in the early 70's. In 1978, Philip Ettinger described "Holiday heart syndrome" (HHS) for the first time, as the occurrence, in healthy people without heart disease known to cause arrhythmia, of an acute cardiac rhythm disturbance, most frequently atrial fibrillation, after binge drinking. The name is derived from the fact that episodes were initially observed more frequently after weekends or public holidays. Since the original description of HHS, 34 years have passed and new research in this field has increased the volume of knowledge related to this syndrome. Throughout this paper the authors will comprehensively review most of the available data concerning HHS and highlight the questions that remain unresolved.

  7. Industrial Pastoral: Lake Macquarie Coal Miners’ Holidays

    Directory of Open Access Journals (Sweden)

    Russell McDougall

    2010-11-01

    Full Text Available As Stephen Page and Joanne Connell note in their mapping of the field, leisure studies is a largely post-war development, evolving internationally out of geography, economics, sociology and a range of other disciplines mostly in the social sciences rather than the humanities. Historians have not ignored the subject – there are plenty of historical studies of sports and recreation, the development of national parks, and so on. Yet, while leisure clearly has a vital and dynamic relation to work – culturally, politically, psychologically – labour historians in Australia appear to have been less interested in this area of research. We, the authors of this article, are primarily literary scholars rather than historians, but we have been puzzled by this apparent neglect. It is not our brief to examine the contemporary meanings of ‘leisure’ in relation to ‘work’ (or ‘forced labour,’ to adopt Guy Standing’s important twenty-first century distinction. Instead, our own study of coal miners’ holidays around Lake Macquarie from the late nineteenth and into the second half of the twentieth century considers the bygone rituals and activities of their holidaying from the vantage point of our own present location in an age where ‘simulation and nostalgia lie at the heart of everyday life.’ The article includes memoir and creative writing along with theory and analysis.

  8. Holiday Heart Syndrome Revisited after 34 Years

    International Nuclear Information System (INIS)

    Tonelo, David; Providência, Rui; Gonçalves, Lino

    2013-01-01

    The cardiovascular effects of alcohol are well known. However, most research has focused on the beneficial effects (the 'French paradox') of moderate consumption or the harmful consequences, such as dilated cardiomyopathy, associated with heavy consumption over an extended period. An association between the ingestion of acute alcohol and onset of cardiac arrhythmias was first reported in the early 70's. In 1978, Philip Ettinger described 'Holiday heart syndrome' (HHS) for the first time, as the occurrence, in healthy people without heart disease known to cause arrhythmia, of an acute cardiac rhythm disturbance, most frequently atrial fibrillation, after binge drinking. The name is derived from the fact that episodes were initially observed more frequently after weekends or public holidays. Since the original description of HHS, 34 years have passed and new research in this field has increased the volume of knowledge related to this syndrome. Throughout this paper the authors will comprehensively review most of the available data concerning HHS and highlight the questions that remain unresolved

  9. Impact of urbanization and industrial development on holiday effect

    Science.gov (United States)

    Tan, P.-H.; Chen, P.-Y.

    2012-04-01

    Our study is to examine the "holiday effect", defined as the difference in air pollutant concentrations between holiday and non-holiday periods, and associated factors controlling the strength of holiday effect in Taiwan. This holiday effect can be applied to other countries with similar national or cultural holidays. Daily surface measurements of six major air pollutants from fifty-four air quality monitoring stations of the Taiwan Environmental Protection Administration (TEPA) during the Chinese New Year (CNY) and non-Chinese New Year (NCNY) periods of 1994-2008 are used. The air pollutant concentrations are significantly different between the CNY and NCNY periods, in almost all the Taiwan area, except CO in the eastern part which is a relatively less-developed area. The strengths of holiday effects of NOx, CO, NMHC and O3 are larger in the north than in the south, and those of SO2 and PM10 are larger in the south than in the north. Factors controlling the strength of holiday effect such as the degree of urbanization and anthropogenic sources are examined. The population number and motor vehicle number rather than the population number density and motor vehicle number density have a significantly positive relationship with the strengths of holiday effects of NOx, CO and NMHC. The strengths of holiday effects of NOx and CO are mainly contributed from mobile sources and those of SO2 and PM10 are from stationary sources and that of NMHC is from both mobile and stationary sources. As the dominant anthropogenic sources in the air quality division have larger emissions, holiday effect strengths of associated air pollutants are found to be stronger.

  10. PAT portable appliance testing : in-service inspection and testing of electrical equipment

    CERN Document Server

    Scaddan, Brian

    2015-01-01

    The Electricity at Work Regulations 1989 requires any electrical system to be constructed, maintained and used in such a manner as to prevent danger. This means that inspection and testing of systems, including portable appliances, is needed in order to determine if maintenance is required. This book explains in clear language what needs to be done and includes expert advice on legislation as well as actual testing. The book contains an appendix providing the electrical fundamentals needed by non-specialists and also has sample questions (with answers) for the C&G 2377 exam. It is also an ideal revision guide for the non-specialist, such as maintenance staff and caretakers who carry out these tasks part-time, alongside their many other duties.

  11. Comparison between different methods for inspection of wooden poles in service in electricity distribution networks; Comparacao entre diferentes metodos de inspecao de postes de madeira em servico em redes de distribuicao de energia

    Energy Technology Data Exchange (ETDEWEB)

    Cruz, M.A.O.; Pires, M.; Dedavid, B.A.; Vidor, F.L.R.; Oliveira, W.S.; Abruzzi, R.C. [Pontificia Univ. Catolica do Rio Grande do Sul (PUC-RS), Porto Alegre, RS (Brazil). Programa de Pos-Graduacao em Engenharia e Tecnologia de Materiais (PGETEMA)], Email: mpires@pucrs.br

    2010-07-01

    The pole is the main support structure of the electric network and should be inspected regularly to ensure system security. The aim of this study is to compare traditional and instrumental inspection methods of the wooden poles in service in AES Sul power distribution network (Montenegro, RS). The inspections were conducted in about 180 poles in two measurement campaigns (2001 and 2010). The procedure was based on the traditional inspection (visual inspection, percussion and effort lateral) and instrumental method based on Polux equipment that measures the penetration resistance and moisture content of wood. The results were compared in search of assertiveness of the methods used to subsidize the standardization of inspection procedures. (author)

  12. POLLUTION PREVENTION OPPORTUNITY ASSESSMENT - U.S. POSTAL INSPECTION SERVICE FORENSIC & TECHNICAL SERVICES DIVISION - NATIONAL FORENSIC LABORATORY, DULLES, VIRGINIA

    Science.gov (United States)

    The United States Postal Service (USPS) in cooperation with EPA's National Risk Management Research Laboratory (NRMRL) is engaged in an effort to integrate waste prevention and recycling activities into the waste management programs at Postal facilities. This report describes the...

  13. Seasonal foreign bodies: the dangers of winter holiday ornamentation.

    Science.gov (United States)

    Trout, Andrew T; Towbin, Alexander J

    2014-12-01

    Foreign bodies, whether ingested, aspirated or retained in the soft tissues, are a particular hazard to pediatric patients. Ornamentation associated with the winter holidays is an uncommon source of foreign bodies in children, and many of these foreign bodies have a distinct appearance on imaging. Knowledge of these appearances and the unusual features of winter holiday foreign bodies might facilitate their identification.

  14. Holiday heart syndrome: a case report | Garba | Nigerian Journal of ...

    African Journals Online (AJOL)

    Alcohol is known to have both beneficial and detrimental effects on the cardiovascular system. An association has been found between alcohol use and rhythm disturbances, especially binge drinking that may occur on holidays and weekends. Not much literature can be found on the prevalence of Holiday Heart Syndrome ...

  15. 我的寒假%My Winter Holidays

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    @@ Winter holidays have about twenty days.During winter holidays, I do all kinds of interesting thing.I like climbing the hill,because it can make me heMthy.I like fishing,it can give me a lot of fun.I like visiting some places of interest, it can enlarge my knowledge.

  16. An experience with in-service fabrication and inspection of austenitic stainless steel piping in high temperature sodium system

    Energy Technology Data Exchange (ETDEWEB)

    Ravi, S., E-mail: sravi@igcar.gov.in; Laha, K.; Sakthy, S.; Mathew, M.D.; Bhaduri, A.K.

    2015-04-01

    Highlights: • Procedure for changing 304L SS pipe to 316L SS in sodium loop has been established. • Hot leg made of 304L SS was isolated from existing cold leg made of 316LN SS. • Innovative welding was used in joining the new 316L SS pipe with existing 316LN SS. • The old components of 304L SS piping have been integrated with the new piping. - Abstract: A creep testing facility along with dynamic sodium loop was installed at Indira Gandhi Centre for Atomic Research, Kalpakkam, India to assess the creep behavior of fast reactor structural materials in flowing sodium. Type 304L austenitic stainless steel was used in the low cross section piping of hot-leg whereas 316LN austenitic stainless steel in the high cross section cold-leg of the sodium loop. The intended service life of the sodium loop was 10 years. The loop has performed successfully in the stipulated time period. To enhance its life time, it has been decided to replace the 304L piping with 316L piping in the hot-leg. There were more than 300 welding joints involved in the integration of cold-leg with the new 316L hot-leg. Continuous argon gas flow was maintained in the loop during welding to avoid contamination of sodium residue with air. Several innovative welding procedures have been adopted for joining the new hot-leg with the existing cold-leg in the presence of sodium residue adopting TIG welding technique. The joints were inspected for 100% X-ray radiography and qualified by performing tensile tests. The components used in the discarded hot-leg were retrieved, cleaned and integrated in the renovated loop. A method of cleaning component of sodium residue has been established. This paper highlights the in-service fabrication and inspection of the renovation.

  17. Surgery during holiday periods and prognosis in oesophageal cancer: a population-based nationwide Swedish cohort study.

    Science.gov (United States)

    Markar, Sheraz R; Wahlin, Karl; Mattsson, Fredrik; Lagergren, Pernilla; Lagergren, Jesper

    2016-09-06

    Previous studies indicate an increased short-term and long-term mortality from major cancer surgery performed towards the end of the working week or during the weekend. We hypothesised that the prognosis after major cancer surgery is also negatively influenced by surgery conducted during holiday periods. Population-based nationwide Swedish cohort study. Patients undergoing oesophagectomy for oesophageal cancer between 1987 and 2010. Among 1820 included patients, 206 (11.3%) and 373 (20.5%) patients were operated on during narrow and wide holiday periods, respectively. Narrow (7 weeks) and wide (14 weeks) Swedish holiday periods. 90-day all-cause, 5-year all-cause and 5-year disease-specific mortality. Narrow holiday period did not increase all-cause 90-day (HR=0.84, 95% CI 0.53 to 1.33), all-cause 5-year (HR=1.01, 95% CI 0.85 to 1.21) or disease-specific 5-year mortality (HR=1.04, 95% CI 0.87 to 1.26). Similarly, wide holiday period did not increase the risk of 90-day (HR=0.79, 95% CI 0.55 to 1.13), all-cause 5-year (HR=0.96, 95% CI 0.84 to 1.1) or disease-specific 5-year mortality (HR=1.03, 95% CI 0.89 to 1.19). No measurable effects of holiday periods on short-term or longer term mortality following surgery for oesophageal cancer were observed in this population-based study, indicating that an adequate surgical experience was maintained during holiday periods. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/

  18. Evaluation of sampling schemes for in-service inspection of steam generator tubing

    International Nuclear Information System (INIS)

    Hanlen, R.C.

    1990-03-01

    This report is a follow-on of work initially sponsored by the US Nuclear Regulatory Commission (Bowen et al. 1989). The work presented here is funded by EPRI and is jointly sponsored by the Electric Power Research Institute (EPRI) and the US Nuclear Regulatory Commission (NRC). The goal of this research was to evaluate fourteen sampling schemes or plans. The main criterion used for evaluating plan performance was the effectiveness for sampling, detecting and plugging defective tubes. The performance criterion was evaluated across several choices of distributions of degraded/defective tubes, probability of detection (POD) curves and eddy-current sizing models. Conclusions from this study are dependent upon the tube defect distributions, sample size, and expansion rules considered. As degraded/defective tubes form ''clusters'' (i.e., maps 6A, 8A and 13A), the smaller sample sizes provide a capability of detecting and sizing defective tubes that approaches 100% inspection. When there is little or no clustering (i.e., maps 1A, 20 and 21), sample efficiency is approximately equal to the initial sample size taken. Thee is an indication (though not statistically significant) that the systematic sampling plans are better than the random sampling plans for equivalent initial sample size. There was no indication of an effect due to modifying the threshold value for the second stage expansion. The lack of an indication is likely due to the specific tube flaw sizes considered for the six tube maps. 1 ref., 11 figs., 19 tabs

  19. Organization of inspection of radioactive wastes by the public health services

    International Nuclear Information System (INIS)

    Pellerin, P.; Gahinet, M.E.

    1983-01-01

    The liquid and gaseous radio-active wastes produced by nuclear plants are subjected to regulations and strict control by the administration for Public Health. The regulations and the procedures and arrangements which they prescribe are described. The main aspects of the role played by the Central service for protection against ionizing radiation (SCPRI) are presented [fr

  20. 7 CFR 868.90 - Fees for certain Federal inspection services.

    Science.gov (United States)

    2010-01-01

    ... or sample) 13.75 (iii) Factor analysis (per factor) 5.65 (2) Additional Tests—Unit Rates (Hops): (i... Commodities): (i) Factor analysis (per factor) 5.65 (4) Stowage Examination (service-on-request) 4 (i) Ship... (24) Protein 16.00 (25) Sanitation (light filth) 47.00 (26) Sieve test 11.00 (27) Smoke Point 43.00...

  1. In-service inspection of nuclear reactor vessels and steam generators. Results and evolution of the technics

    International Nuclear Information System (INIS)

    Rapin, Michel; Saglio, Robert.

    1978-01-01

    Methods and original technics have been developed by the CEA for inspection of the primary coolant circuit of PWR. Multifrequency Eddy currents for inspection of steam generators tubes gudgeons and bolts; focussed ultrasonics to test all the welds of the reactor vessel and its cover of mixed welds of tanks and steam generators, pressurizer welds and gudgeons from the inside; gamma radiography of vessel mixed welds, televisual examination of the stainless steel lining of the reactor vessel and its cover. Use of these technics is made with specific automatic machines designed either for inspection of steam generator tubes or for complete inspection of the vessel. Several reactors were inspected with these devices [fr

  2. Development of Quality Management System Under ISO 9001:2015 and Joint Inspection Group (JIG for Aviation Fuelling Service

    Directory of Open Access Journals (Sweden)

    Ruamchat Kanon

    2017-09-01

    Full Text Available The Joint Inspection Group (JIG standard for aviation fuel quality management assists in the operational process and maintenance of aviation fuel from its point of origin and through distribution systems to airports. Currently, problems arise as the JIG standard and quality management in aviation fuel are isolated and have independent procedures. Merging the JIG standards with ISO 9001:2015 can override original JIG’s philosophy by connecting all quality assessment, and management parties involved, throughout the supply chain. This integration can harmonize auditing tasks, focusing on risk/opportunity, and continue quality improvement focus. This paper proposes a development of quality management system (QMS under ISO 9001:2015 for aviation fuelling service in a systematic way. The content and critical success factors of ISO 9001:2015 and JIG standards were studied. The beneficial synergies, similarities, and logical linkages between both standards are identified. This QMS was developed in the largest petroleum company in Thailand and 60 selected experts were surveyed, with a response rate of 88.3%, for their agreement on integrated criteria. Two external quality auditors, who have ISO 9001 and JIG expertise, were interviewed to modify our initial proposed QMS. The final QMS was implemented in the into-plane fuelling services as the first phase of this implementation. Results of framework implementation are discussed in a case study. There are mutual benefits resulting from the integration of JIG and ISO 9001:2015 standards. This QMS provides a unified process for quality management practices, and enhances the effectiveness of risk evaluation as well as the opportunity for continued quality improvement. It facilitates the identification of ISO 9001:2015 requirements and establishes relationships between the roles of JIG standard and the clauses of ISO 9001:2015. The first experience from five airports as the pilot study of proposed QMS

  3. Guided wave technology for in-service inspection and online monitoring for long term operation of nuclear power plants

    International Nuclear Information System (INIS)

    Bertoncini, Francesco; Raugi, Marco; Cappelli, Mauro; Cordella, Francesco; Mazzini, Davide

    2015-01-01

    In-Service Inspection (ISI) and monitoring of all equipment (Systems, Structures and Components, SSCs) of a Nuclear Power Plant (NPP), are actions aimed at preventing failures both for economical and safety purposes. SSCs ageing due to stresses such as corrosion, load variations, flow conditions, temperature and neutron irradiation can be a potential limit for NPP life extension or operation beyond their license term (Long Term Operation. LTO). ISI has a main role on the actual possibility of LTO assuring the required safety. Guided Waves are structure-borne ultrasonic waves that propagate along the structure confined and guided by its geometric boundaries. Guided Wave Testing can find defect locations through long-range screening using low-frequency waves (from 5 to 250 kHz). The technology is regularly used for pipe testing in the oil and gas industry. In the nuclear industry, regulators are working to standardize monitoring and inspection procedures. To use the technology inside an active plant, operators must solve issues like high temperatures (up to more than 300degC inside a light-water reactor's primary piping), high wall thickness of components in the primary circuit and characteristic defect typologies. Magnetostrictive sensors are expected to overcome such issues due to their physical properties, namely robust constitution and simplicity. Recent experimental results have demonstrated magnetostrictive transducers can withstand temperatures close to 300degC. In this paper, new experimental tests conducted using such a methodology will be described and open issues related to high temperature guided wave applications (e.g. wave velocity or amplitude fluctuations during propagation in variable temperature components) will be discussed. (author)

  4. Air pollution "holiday effect" resulting from the Chinese New Year

    Science.gov (United States)

    Tan, Pei-Hua; Chou, Chia; Liang, Jing-Yi; Chou, Charles C.-K.; Shiu, Chein-Jung

    Our study was an attempt to conduct a comprehensive and systematical examination of the holiday effect, defined as the difference in air pollutant concentrations between holiday and non-holiday periods. This holiday effect can be applied to other countries with similar national or cultural holidays. Hourly and daily surface measurements of six major air pollutants from thirteen air quality monitoring stations of the Taiwan Environmental Protection Administration during the Chinese New Year (CNY) and non-Chinese New Year (NCNY) periods were used. We documented evidence of a "holiday effect", where air pollutant concentrations were significantly different between holidays (CNY) and non-holidays (NCNY), in the Taipei metropolitan area over the past thirteen years (1994-2006). The concentrations of NO x, CO, NMHC, SO 2 and PM 10 were lower in the CNY than in the NCNY period, while the variation in the concentration of O 3 was reversed, which was mainly due to the NO titration effect. Similar differences in these six air pollutants between the CNY and NCNY periods were also found in the diurnal cycle and in the interannual variation. For the diurnal cycle, a common traffic-related double-peak variation was observed in the NCNY period, but not in the CNY period. Impacts of dust storms were also observed, especially on SO 2 and PM 10 in the CNY period. In the 13-year period of 1994-2006, decreasing trends of NO x and CO in the NCNY period implied a possible reduction of local emissions. Increasing trends of SO 2 and PM 10 in the CNY period, on the other hand, indicated a possible enhancement of long-range transport. These two mechanisms weakened the holiday effect.

  5. Holiday Play for Children with Disabilities in England: Access, Choice and Parents' Views about Integration

    Science.gov (United States)

    Parker, Wendy; Gage, Heather; Sterr, Annette; Williams, Peter

    2017-01-01

    Families with children with disabilities can feel isolated during school holidays and concerns exist that they face greater difficulties than families of children without disabilities in finding enriching activities for their child. In the context of national policies that encourage integrated play, local service commissioners in England require…

  6. Report on the Regulatory Experience of Risk-Informed In-service Inspection of Nuclear Power Plant Components and Common Views (consensus document)

    International Nuclear Information System (INIS)

    2004-08-01

    The present report represents the work product of the activities conducted by the Task Force. The TF performed a review and inventory of the existing approaches to risk-informed inservice inspection and testing, and completed its work in 1999 with a Current Practices Document 2, titled Report on risk-informed in-service inspection and in-service testing (EUR 19153 EN). In November 2001, the NRWG held a Special session on risk-informed applications, with emphasis on risk-informed inservice inspection, where results and experiences from pilot studies on risk-informed inservice inspection (RI-ISI), performed in several European countries, were presented and discussed. As a follow-up in May 2002, the TF was reconvened with the objectives to analyse from the regulatory point of view key aspects associated with the application of risk-informed inservice inspection, and to go beyond a state of the art report, presenting a series of recommendations of good practices or common positions reached by the regulators represented in the Task Force. (author)

  7. Automated ultrasonic testing of nuclear reactor welds and overlays in pre-service and in-service inspections

    International Nuclear Information System (INIS)

    Sladky, J.

    1988-01-01

    Since 1982, automatic pre-service and in-service checks are being made of welded joints and overlays on pressure vessels of WWER-440 nuclear reactors in Czechoslovakia. This is being done using the SKODA REACTORTEST TRC facility which is used for checking peripheral welded joints on the pressure vessel, neck joints, overlays in other selected areas of the cylindrical section of the pressure vessel, on radius transitions of the pressure vessel and of necks, and on the cylindrical part of necks, and also for checking the base material in selected parts of the pressure vessel and the base material of the neck extension piece. The tests are of two types, namely tests of peripheral welds and overlays of the cylindrical parts of the pressure vessel, and tests of the necks. Different ultrasonic probe holders are used for the tests, with totally different design. Ultrasonic probes which were initially used were of foreign make while at present, those of Czechoslovak make are used. For each pressure vessel a set of ultrasonic probes is used which should suffice for the life of the vessel. Experience gained so far is being used in work on the project of a new device for testing nuclear reactor presure vessels from the inside. (Z.M.)

  8. Estimating the right allocation of resources on weekends and public holidays in Green Zone using hybrid methods

    Science.gov (United States)

    Yusoff, Nazhatul Sahima Mohd; Liong, Choong-Yeun; Ismail, Wan Rosmanira; Noh, Abu Yazid Md; Noor, Nur Amalina Mohd

    2018-04-01

    Long patient waiting time and congestion is a major problem faced by Green Zone in Emergency Department at Hospital Universiti Sains Malaysia (EDHUSM) especially during weekends and public holidays. Even though the Green Zone is servicing only the non-critical patients, patient waiting time, causing the department fails to achieve its Key Performance Indicator (KPI). The long waiting time is due to the insufficient resources provided during the weekends and public holidays versus the large number of patients. Currently, only two doctors supported by two nurses are scheduled for every shift during weekends and public holidays. The numbers of patients are higher during weekends and public holidays as compared to weekdays, but the scheduled number of doctors and nurses are the same as weekdays. Therefore, this study presents a hybrid method to estimate the right number of doctors and nurses for improving the services of the Green Zone during weekends and public holidays. Fifty scenarios based on current and proposed schedules of doctors and nurses are simulated and analysed using the hybrid method of Discrete Event Simulation (DES) and Data Envelopment Analysis (DEA). Banker, Charnes and Cooper (BCC) input-oriented model and Super-Efficiency models of DEA were used to analyse the efficiency of the scenarios. The results show that the best schedule is a combination of four doctors supported by four nurses in every shift during weekends and public holidays for the Green Zone. The findings show that such schedule will not only help the department to achieve its KPI but also enable a more optimal utilization of the resources.

  9. Effects of the regulatory inspections on nuclear medicine services executed by the Radioprotection and Dosimetry Services, Brazil

    International Nuclear Information System (INIS)

    Alves, C.E.G.R.; Farias, C.; Azevedo, E.M.; Nanni, G.J.; Vasconcellos, L.; Mendes, L.C.G.; Souza, L.A.C.; Franca, W.F.L.; Goncalves, M.

    2005-01-01

    The advances in the Nuclear Medicine auditing field performed by Nuclear Medicine Group of the Radiotherapy and Nuclear Medicine Division of the Institute of Radiation Protection and Dosimetry are shown. The main aspects observed during the auditing are presented as well as the evolution of the non-conformities. Its is also shown that the occurrence of these non-conformities decreases year by year, primarily as a function of the severity of the auditing and the consciousness of the personal of Nuclear Medicine Services. Results point clearly to the importance of the coercion actions to guarantee a radiation protection level in compliance with the standards established by the Brazilian Nuclear Energy Commission. (author)

  10. STRATEGI PEMASARAN PAKET WISATA PADA PT. CAHAYA TEDUNG ABADI HOLIDAY DENPASAR

    Directory of Open Access Journals (Sweden)

    Putu Doddy Pramana

    2017-01-01

    Full Text Available PT. Cahaya Tedung Abadi Holiday is a business that handles tour ticket sales, travel documents, tour guide services, hotel reservation and sales of tour packages. To anticipate the traveler visits that always fluctuated and competition with other travel agency, need to be design tour package marketing strategy. So PT. Cahaya Tedung Abadi Holiday can optimize the strength, opportunities, and minimize the weaknesses and threats. The goal is to find alternative are strategies and programs that can be implemented by PT. Cahaya Tedung Abadi Holiday in selling tour package. Data collection techniques using the method of observation, in-depth interviews, library research and documentation. Researchers used a key informant Mr. I Gusti Sudarsana, two employees and sales marketing products as an informant base. This research is a descriptive qualitative with Matrix SWOT approach and the marketing mix. Alternative strategies that can be implemented by PT. Cahaya Tedung Abadi Holiday are : (a create and develop tourism products strategy by creating new innovative tourism products and a special interest tour packages, (b market segmentation strategy development with opportunities to develop a broader market, (c increased promotion strategy by advertising, brochures and collaboration with TV channel with tourism programs information, (d improve the quality of products and services strategies by redesigning the tour packages program more interesting in order the tourists interested to buy tour packages, maintaining cleanliness and tidiness of the vehicle and driver guides during tours and reemphasize tourism products according to the company market share. The suggestion for the company to expand its market share in order to survive the competition of other travel agencies, companies should increase the workforce to be more rapid and responsive in accepting tour packages purchases and fixed preserve good relations with related companies such as the hotel

  11. In-service inspection of condenser tubes by means of electrochemical methods

    International Nuclear Information System (INIS)

    Taelemans, G.

    The commissioning of an increasing number of large nuclear power plants involves an increased significance of such condenser tube problems as: - erosion on tube ends, - generalized corrosion and pitting corrosion, - deposits in the tubes. In order to solve such problems, investigations were performed especially focused on a measurement technique that enables in-service behaviour of condenser tubes to be monitored. For such a purpose, measurement of the polarization resistance has been adopted. The existing corrosion products and scaled-off iron oxides were eliminated by means of a carborundum balls processing, as clearly appears from polarization resistance reduction. Then iron sulphate was injected in order to build a new and better protective layer. In addition, the tube was kept clean by means of foam rubber balls. There is a second implementation area: fouled condenser tubes. A significant polarization resistance reduction is noted during the acid cleaning. (orig.) [de

  12. Role of in-service inspection and maintenance in reliability assurance of concrete structures in nuclear plants

    International Nuclear Information System (INIS)

    Ellingwood, B.R.; Mori, Y.

    1993-01-01

    The degradation in strength of a component with random damage is evaluated using a growth model for individual damages which can be obtained from experimental data. The distribution function of damage intensity after inspection and repair is updated using a Bayesian analysis that takes the quality of inspection into account. With this posterior distribution, the time-dependent strength after the inspection and repair can be evaluated. Time-dependent reliability analysis can be used to determine inspection/repair strategies that are necessary to keep the failure probability of the component lower than an established target. (author)

  13. The Role of Turkish National Holidays in Promoting Character and Citizenship Education

    Science.gov (United States)

    Acikalin, Mehmet; Kilic, Hamide

    2017-01-01

    Purpose: This article introduces the history and development of Turkish national holidays. It also describes how these holidays being celebrated overtime in Turkey. Thus, the purpose of this article is providing fundamental information regarding Turkish national holidays and discussing possible role of these holidays in promoting character and…

  14. 5 CFR 550.172 - Relation to overtime, night, and holiday pay.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Relation to overtime, night, and holiday..., and holiday pay. Premium pay for Sunday work is in addition to premium pay for holiday work, overtime... used to compute the pay for holiday work, overtime pay, or night pay differential. Law Enforcement...

  15. 5 CFR 550.131 - Authorization of pay for holiday work.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Authorization of pay for holiday work... REGULATIONS PAY ADMINISTRATION (GENERAL) Premium Pay Pay for Holiday Work § 550.131 Authorization of pay for holiday work. (a) Except as otherwise provided in this subpart, an employee who performs holiday work is...

  16. An unhealthy holiday on Lake Bolsena

    Directory of Open Access Journals (Sweden)

    Lucio Brugioni

    2013-03-01

    Full Text Available A 70-year old man (OL was hospitalized due to fever (up to 40°C associated with malaise and abdominal pain. Tests showed hypereosinophilic syndrome, and increased liver and inflammation indexes. Abdominal echography showed a nonhomogeneous liver and the spleen was enlarged. Abdominal computed tomography showed multiple abscesses on the liver. The patient reported that he had recently gone on holiday to Lake Bolsena where he had eaten raw fish. A specialist in infectious diseases confirmed that in that area there is an infestation of Opisthorchis felineus. Analysis of blood and stool samples confirmed the presence of this parasite. The patient was treated with praziquantel with resolution of fever and improvement in clinical tests and general condition. Opisthorchis felineus is a parasite that commonly infects dogs and cats. Infection is sometimes transmitted to man and is usually related to eating raw fish. The parasite enters the liver and its eggs are found in the patient’s stool samples. Acute symptoms are: fever, diarrhea, abdominal pain, and malaise. Hypereosinophilic syndrome and increase in liver index are typical. Chronic infection could result in cholangiocarcinoma. Presence of the parasite is confirmed through specific analysis of blood and stool. Therapy consists of praziquantel or, as second choice, abendazol. In the 20th century, there were 4 epidemics in Italy, on Lakes Trasimeno and Bolsena in Central Italy. The latest epidemic was reported in that area in summer 2012.

  17. An in-service inspection method: the use of focused probes for the detection and sizing in DDT Plates 1 and 2

    International Nuclear Information System (INIS)

    Birac, A.M.; Pincemaille, G.; Saglio, R.; Cattiauz, G.; Morisseau, P.

    1983-01-01

    As part of the DDT programme to evaluate the nondestructive testing methods used during the in-service inspection (ISI) of PWR vessels, the UKAEA asked the CEA-STA-SCND to perform the ultrasonic examination of two test-plates. Each plate was bisected across its full width by a full-thickness butt-weld in which calibrated defects of various natures, dimensions, orientations have been inserted. It was required that the implementation of control, the equipment and the subsequent data analysis represent as nearly as possible the French procedure in force during the pre-service and in-service inspection of a PWR vessel. As suggested by the UKAEA, to evaluate the influence of examiners on the results, the examinations have been carried out twice by two independent teams: one from the CEA-STA-SCND and the second from INTERCONTROLE (a CEA subsidiary company). Procedure and results are given. (author)

  18. Capability evaluation of Eddy current and ultrasonic in-service inspections of steam generator tubes. A status report of PISC III Action 5

    International Nuclear Information System (INIS)

    Bieth, M.; Birac, C.; Comby, R.

    1998-01-01

    Document summarizes the PISC III (Programme for the Inspection of Steel Components) report No. 41, full description of the PISC III Action 5 on Steam Generator Tubes Inspection, containing all details and final conclusions which are still to be approved by the PISC III Management Board. The report was prepared by the reference laboratory of PISC under guidance and with continuous contribution of the members of the Data Analysis Group (DAG) of this PISC III. There were several procedures which demonstrated good detection capability of major flaws in typical locations of the steam generator. Conclusions of the exercise indicate that capability demonstration is necessary to qualify in service inspection procedures for steam generator tubes

  19. Foodborne Outbreaks Reported to the U.S. Food Safety and Inspection Service, Fiscal Years 2007 through 2012.

    Science.gov (United States)

    Robertson, Kis; Green, Alice; Allen, Latasha; Ihry, Timothy; White, Patricia; Chen, Wu-San; Douris, Aphrodite; Levine, Jeoffrey

    2016-03-01

    The U.S. Department of Agriculture's Food Safety and Inspection Service (FSIS) works closely with federal, state, and local public health partners to investigate foodborne illness outbreaks associated with its regulated products. To provide insight into outbreaks associated with meat and poultry, outbreaks reported to FSIS during fiscal years 2007 through 2012 were evaluated. Outbreaks were classified according to the strength of evidence linking them to an FSIS-regulated product and by their epidemiological, etiological, and vehicle characteristics. Differences in outbreak characteristics between the period 2007 through 2009 and the period 2010 through 2012 were assessed using a chi-square test or Mann-Whitney U test. Of the 163 reported outbreaks eligible for analysis, 89 (55%) were identified as possibly linked to FSIS-regulated products and 74 (45%) were definitively linked to FSIS-regulated products. Overall, these outbreaks were associated with 4,132 illnesses, 772 hospitalizations, and 19 deaths. Shiga toxin-producing Escherichia coli was associated with the greatest proportion of reported outbreaks (55%), followed by Salmonella enterica (34%) and Listeria monocytogenes (7%). Meat and poultry products commercially sold as raw were linked to 125 (77%) outbreaks, and of these, 105 (80%) involved beef. Over the study period, the number of reported outbreaks definitively linked to FSIS-regulated products (P = 0.03) declined, while the proportion of culture-confirmed cases (P = 0.0001) increased. Our findings provide insight into the characteristics of outbreaks associated with meat and poultry products.

  20. A periodic review integrated inventory model with controllable setup cost, imperfect items, and inspection errors under service level constraint

    Science.gov (United States)

    Saga, R. S.; Jauhari, W. A.; Laksono, P. W.

    2017-11-01

    This paper presents an integrated inventory model which consists of single vendor and buyer. The buyer managed its inventory periodically and orders products from the vendor to satisfy the end customer’s demand, where the annual demand and the ordering cost were in the fuzzy environment. The buyer used a service level constraint instead of the stock-out cost term, so that the stock-out level per cycle was bounded. Then, the vendor produced and delivered products to the buyer. The vendor had a choice to commit an investment to reduce the setup cost. However, the vendor’s production process was imperfect, thus the lot delivered contained some defective products. Moreover, the buyer’s inspection process was not error-free since the inspector could be mistaken in categorizing the product’s quality. The objective was to find the optimum value for the review period, the setup cost, and the number of deliveries in one production cycle which might minimize the joint total cost. Furthermore, the algorithm and numerical example were provided to illustrate the application of the model.

  1. A pilot application of risk-based methods to establish in-service inspection priorities for nuclear components at Surry Unit 1 Nuclear Power Station

    International Nuclear Information System (INIS)

    Vo, T.; Gore, B.; Simonen, F.; Doctor, S.

    1994-08-01

    As part of the Nondestructive Evaluation Reliability Program sponsored by the US Nuclear Regulatory Commission, the Pacific Northwest Laboratory is developing a method that uses risk-based approaches to establish in-service inspection plans for nuclear power plant components. This method uses probabilistic risk assessment (PRA) results and Failure Modes and Effects Analysis (FEMA) techniques to identify and prioritize the most risk-important systems and components for inspection. The Surry Nuclear Power Station Unit 1 was selected for pilot applications of this method. The specific systems addressed in this report are the reactor pressure vessel, the reactor coolant, the low-pressure injection, and the auxiliary feedwater. The results provide a risk-based ranking of components within these systems and relate the target risk to target failure probability values for individual components. These results will be used to guide the development of improved inspection plans for nuclear power plants. To develop inspection plans, the acceptable level of risk from structural failure for important systems and components will be apportioned as a small fraction (i.e., 5%) of the total PRA-estimated risk for core damage. This process will determine target (acceptable) risk and target failure probability values for individual components. Inspection requirements will be set at levels to assure that acceptable failure probabilistics are maintained

  2. Summary Report - Inspections of DoD Facilities and Military Housing and Audits of Base Operations and Support Services Contracts

    Science.gov (United States)

    2016-10-14

    drinking water quality, radon, pest management, mold, and radiation. In addition, during the Japan and Korea inspections, we evaluated the management...Components responsible for facilities management conduct such analyses and use the results of these root cause analyses to improve facility management...water quality, radon, mold, pest infestation, lead-based paint, asbestos, and radiation) requirements. These inspections should be conducted by

  3. Experience with ANSI N14.30 for in-service inspections of semi-trailer used for spent fuel shipments

    International Nuclear Information System (INIS)

    Hirtz, G.J.

    1998-05-01

    On July 18, 1996, the Oak Ridge National Laboratory (ORNL) resumed shipping spent fuel in interstate commerce after a 10 year suspension of this activity. This shipment was conducted using a Nuclear Regulatory Commission licensed spent fuel transport package purchased from General Electric Company by ORNL for the purpose of moving High Flux Isotope Reactor spent fuel to the Savannah River Site. The trailer, fabricated to the ANSI N14.30, Semi-Trailers Employed in the Highway Transport of Weight Concentrated Radioactive Loads Design, Fabrication, and Maintenance, has recently undergone its first scheduled in-service inspection. This paper presents the experience gained from interpretation and application of the ANSI N14.30 standard focusing on the in-service inspection for the structure of the trailer. Initially, the term weight concentrated is illustrated giving detail to the location and center of gravity of the 33,500 pound shipping container and forces induced by the tie down system. Basic information about the design stresses and initial testing provided by the manufacturer are used as a lead-in to the requirements of the standard. The task of examining the trailer structure provided many lessons and required considerable effort. All of the support personnel were provided by ORNL; the garage mechanics and the certified inspection engineers had never been involved in applying ANSI N14.30. Other obstacles were the lack of existing inspection procedures for this particular activity and the lack of a previous experience interpreting the standard with regard to repair work. Some of these questions were resolved by clarification received from the writers of the standard, and others were resolved by the teamwork between the manufacturer and ORNL. This experience illustrated the importance of the trailer manufacturer as a participant in the decisions made concerning in-service inspection and maintenance

  4. PRO-ENVIRONMENTAL BEHAVIORS IN THE HOUSEHOLD AND HOLIDAY SETTING. AN EXPLORATORY STUDY AMONG BRASOV CITIZENS

    Directory of Open Access Journals (Sweden)

    ELENA-NICOLETA Untaru

    2015-06-01

    Full Text Available The present paper aims to investigate Brasov citizens’ pro-environmental behavior both in their household and holiday setting. In this sense, we conducted a qualitative research using the in-depth interview method on a 13 respondent sample which included self-declared environmentally friendly residents from the city of Brasov, Romania. Among them, six respondents are members of ecological NGOs and can be considered environmental activists. The interview guide was structured in two sections. First, we considered respondents' pro-environmental behaviors, the description of their activities, aimed at protecting the environment, as well as the tools and resources developed by public authorities in order to facilitate and stimulate citizens’ involvement in environmental protection. The second section was focused on the description of respondents’ last holiday, the choice of tourism destination, transportation, accommodation unit and activities in the destination; respondents’ pro-environmental behaviors; and the tools and instruments developed by local public authorities or hoteliers in order to facilitate tourists’ environmentally friendly behavior. The results of the present study outline the fact that respondents’ involvement in environmentally friendly activities is identical, or almost identical, in both household and holiday setting. For the environmental activists, such a behavior is difficult to change, even in a holiday setting, where environmental protection is one the individuals ‘priority’. The outcomes of our research can be used by both tourist services providers in order to adapt their offer to consumers’ pro-environmental behavior and local authorities who can identify the actions which have to be undertaken in order to facilitate such behavior.

  5. Automated ultrasonic inspection of nuclear plant components

    International Nuclear Information System (INIS)

    Baron, J.A.; Dolbey, M.P.

    1982-01-01

    For reasons of safety and efficiency, automated systems are used in performing ultrasonic inspection of nuclear components. An automated system designed specifically for the inspection of headers in a nuclear plant is described. In-service inspection results obtained with this system are shown to correlate with pre-service inspection results obtained by manual methods

  6. Application of reliability techniques to prioritize BWR [boiling water reactor] recirculation loop welds for in-service inspection

    International Nuclear Information System (INIS)

    Holman, G.S.

    1989-12-01

    In January 1988 the US Nuclear Regulatory Commission issued Generic Letter 88-01 together with NUREG-0313, Revision 2, ''Technical Report on Material Selection and Processing Guidelines for BWR Coolant Pressure Boundary Piping,'' to implement NRC long-range plans for addressing the problem of stress corrosion cracking in boiling water reactor piping. NUREG-0313 presents guidelines for categorizing BWR pipe welds according to their SCC condition (e.g., presence of known cracks, implementation of measures for mitigating SCC) as well as recommended inspection schedules (e.g., percentage of welds inspected, inspection frequency) for each weld category. NUREG-0313 does not, however, specify individual welds to be inspected. To address this issue, the Lawrence Livermore National Laboratory developed two recommended inspection samples for welds in a typical BWR recirculation loop. Using a probabilistic fracture mechanics model, LLNL prioritized loop welds on the basis of estimated leak probabilities. The results of this evaluation indicate that riser welds and bypass welds should be given priority attention over other welds. Larger-diameter welds as a group can be considered of secondary importance compared to riser and bypass welds. A ''blind'' comparison between the probability-based inspection samples and data from actual field inspections indicated that the probabilistic analysis generally captured the welds which the field inspections identified as warranting repair or replacement. Discrepancies between the field data and the analytic results can likely be attributed to simplifying assumptions made in the analysis. The overall agreement between analysis and field experience suggests that reliability techniques -- when combined with historical experience -- represent a sound technical basis on which to define meaningful weld inspection programs. 13 refs., 8 figs., 5 tabs

  7. Development and testing of VTT approach to risk-informed in-service inspection methodology. Final report of SAFIR INTELI INPUT Project RI-ISI

    International Nuclear Information System (INIS)

    Cronvall, O.; Maennistoe, I.; Simola, K.

    2007-04-01

    This report summarises the results of a research project on risk-informed in-service inspection (RI-ISI) methodology conducted in the Finnish national nuclear energy research programme SAFIR (2003-2006). The purpose of this work was to increase the accuracy of risk estimates used in RI-ISI analyses of nuclear power plant (NPP) piping systems, and to quantitatively evaluate the effects of different piping inspection strategies on risk. Piping failure occurrences were sampled by using probabilistic fracture mechanics (PFM) analyses. The PFM results for crack growth were used to construct transition matrices for a discrete-time Markov process model, which in turn was applied to examine the effects of various inspection strategies on the failure probabilities and risks. The applicability of the developed quantitative risk matrix approach was examined as a pilot study performed to the Shut-down cooling piping system 321 in NPP unit OL1 of Teollisuuden Voima Oy (TVO). The analysed degradation mechanisms were stress corrosion cracking (SCC) and thermal fatigue induced cracking (in the mixing points). Here a new and rather straightforward approach was developed to model thermal fatigue induced cracking, which degradation mechanism is much more difficult to model than SCC. This study further demonstrated the usefulness of Markov analysis procedure development by VTT in RI-ISI applications. The most important results are the quantified comparisons of different inspections strategies. It was shown in this study that Markov models are useful for this purpose, when combined with PFM analyses. While the numerical results could benefit from further considerations of inspection reliability, this does not affect the feasibility of the method itself. The approach can be used to identify an optimal inspection strategy for achieving a balanced risk profile of piping segments. (orig.)

  8. Qualification of NDT systems for in-service inspections of nuclear power plant pressure vessels; Ydinvoimalaitosten paineastioiden maeaeraeaikaistarkastuksissa kaeytettaevien NDT-jaerjestelmien paetevoeinti

    Energy Technology Data Exchange (ETDEWEB)

    Elfving, K

    1998-11-01

    The goal of this study is to determine the requirements of the in-service inspection qualification in Europe, their feasibility in practice and to find out possible manufacture defects in test pieces used in practical trials. The literature study consists of qualification requirements set by European regulatory bodies and by the European nuclear power utilities. Also a brief summary of qualification requirements set by ASME Code, Section XI and comparison between ASME and European qualification requirements is included 24 refs.

  9. An ultrasonic methodology for in-service inspection of shell weld of core support structure in a sodium cooled fast reactor

    Energy Technology Data Exchange (ETDEWEB)

    Kumar, Anish, E-mail: anish@igcar.gov.in; Rajkumar, K.V.; Sharma, Govind K.; Dhayalan, R.; Jayakumar, T.

    2015-02-15

    Highlights: • We demonstrate a novel ultrasonic methodology for in-service inspection of shell weld of core support structure in a sodium cooled fast breeder reactor. • The methodology comprises of the inspection of shell weld immersed in sodium from the outside surface of the main vessel using ultrasonic guided wave. • The formation and propagation of guided wave modes are validated by finite element simulation of the inspection methodology. • A defect down to 20% of 30 mm thick wall (∼6 mm) in the shell weld can be detected reliably using the developed methodology. - Abstract: The paper presents a novel ultrasonic methodology developed for in-service inspection (ISI) of shell weld of core support structure of main vessel of 500 MWe prototype fast breeder reactor (PFBR). The methodology comprises of the inspection of shell weld immersed in sodium from the outsider surface of the main vessel using a normal beam longitudinal wave ultrasonic transducer. Because of the presence of curvature in the knuckle region of the main vessel, the normal beam longitudinal wave enters the support shell plate at an angle and forms the guided waves by mode conversion and multiple reflections from the boundaries of the shell plate. Hence, this methodology can be used to detect defects in the shell weld of the core support structure. The successful demonstration of the methodology on a mock-up sector made of stainless steel indicated that an artificial defect down to 20% of 30 mm thick wall (∼6 mm) in the shell weld can be detected reliably.

  10. Notification: Background Investigation Services EPA’s Efforts to Incorporate Environmental Justice Into Clean Air Act Inspections for Air Toxics

    Science.gov (United States)

    Project #OPE-FY14-0017, March 7, 2014. The OIG plans to begin the preliminary research phase of an evaluation of the EPA's efforts to incorporate environmental justice into Clean Air Act (CAA) inspections for air toxics.

  11. In service inspection of the reactor pressure vessel coolant and moderator nozzles at Atucha 1. 1998/1999 outages

    International Nuclear Information System (INIS)

    Antonaccio, Carlos; Conde, Alberto; Fittipaldi, Andres H.; Maniotti, Jorge; Moliterno, Gabriel E.

    2000-01-01

    During the August 1998 and the August 1999 Atucha 1 outages, two areas were inspected on the Reactor Pressure Vessel: the nozzle inner radii and the nozzle shell welds on all 3 moderator nozzles and all 4 main coolant nozzles. The inspections themselves were carried out by Mitsui Babcock Energy Limited from Scotland. The coordination, maintenance assistant and mounting of the manipulator devices over the nozzles were carried out by NASA personnel. Although it was not the first time the nozzle shell welds were inspected, due to the technologies advances in the ultrasonic field and in the inspection manipulators (magnetic ones), it was possible to inspect more volume than in previous inspections. In the other hand, it was the first time NASA was able to inspect the inner radii. In this last case the mayor problems to inspect them were the nozzles geometry and the small space available to install manipulators. The result of the inspections were: 1) There were no reportable indications at any of the inner radii inspected; 2) The inspection of nozzle to shell welds in main-coolant nozzles R3 and R4 detected flaws (one in each nozzle) which were reported as exceeding the dimensions specified as the acceptance level under Table IWB 3512-1, Section XI of the ASME code. Subsequent analysis requested by NASA and performed by Mitsui Babcock, demonstrated that the flaws were over dimensioned and could be explained as due to 'point' flaws. The analysis was based on theoretical mathematic model and experimental trials. Therefore their dimension were under the acceptance level of the ASME XI code. Although the Mitsui Babcock analysis, and at the same time it was in progress, it was assumed that the flaws were as they were originally presented (exceeding the acceptance level). NASA asked SIEMENS/KWU, the designer of the plant, to perform the fracture assessment according to ASME XI App. A. The assessment shows that the expected crack growth is negligibly small and the safety

  12. Increased incidence of adult pneumococcal pneumonia during school holiday periods

    Science.gov (United States)

    Rodrigo, Chamira; Bewick, Thomas; Sheppard, Carmen; Greenwood, Sonia; McKeever, Tricia M.; Slack, Mary; Lim, Wei Shen

    2017-01-01

    Child contact is a recognised risk factor for adult pneumococcal disease. Peaks in invasive pneumococcal disease incidence observed during winter holidays may be related to changes in social dynamics. This analysis was conducted to examine adult pneumococcal community-acquired pneumonia (CAP) incidence during school holiday periods. Between September 2008 and 2013, consecutive adults admitted to hospitals covering the Greater Nottingham area with a diagnosis of CAP were studied. Pneumococcal pneumonia was detected using culture and antigen detection methods. Of 2221 adults studied, 575 (25.9%) were admitted during school holidays and 643 (29.0%) had pneumococcal CAP. CAP of pneumococcal aetiology was significantly more likely in adults admitted during school holidays compared to term time (35.3% versus 26.7%; adjusted OR 1.38, 95% CI 1.11–1.72, p=0.004). Over the 5-year period, the age-adjusted incidence of hospitalised pneumococcal CAP was higher during school holidays compared to term time (incident rate ratio 1.35, 95% CI 1.14–1.60, pholidays compared to term time (42.0% versus 33.7%, OR 1.43, 95% CI 1.00–2.03, p=0.046). Further study of transmission dynamics in relation to these findings and to identify appropriate intervention strategies is warranted. PMID:28326311

  13. The effect of holiday weight gain on body weight.

    Science.gov (United States)

    Schoeller, Dale A

    2014-07-01

    The topic of holiday weight gain has been a frequent subject of the lay media; however, scientific interest has only been recent. Multiple studies in Western societies have reported average weight gains among adults during the period between mid-November and mid-January that were about 0.5 kg. The range in individual weight changes was large, however, and the already overweight and obese gain more weight than those who are healthy weight. When the average gain across the year was also measured, the holiday weight was the major contributor to annual excess weight gain. Efforts patterned to increase awareness to energy balance and body weight have been shown to be successful at reducing such gain. An exception to holiday weight gain being a major contributor to annual excess gain has been children, in whom summer weight gains have been observed to be the major contributor to average excess weight gain. Copyright © 2014 Elsevier Inc. All rights reserved.

  14. Integration of in-service inspection works in the objectives of nuclear power plants; Integracion de los trabajos de inspeccion en servicio en los objectivos de las centrales nucleares

    Energy Technology Data Exchange (ETDEWEB)

    Garcia, M.; Lopez, M.A.

    1996-09-01

    The present articles summarizes the objectives of Spanish NPPs and the in-service inspection aspect in these objectives. The Safety maintenance, lifetime of nuclear power plants, reduction of doses and wastes and the participation of main are evaluated.

  15. Periodical in-service inspection as part of individual program of quality assurance of steam generators and pressurizers of WWER 440 nuclear power plant

    International Nuclear Information System (INIS)

    Kawalec, M.

    1982-01-01

    The manufacturers of equipment for nuclear power plants in the Czechoslovak Socialist Republic are obligated to process so-called individual programs of quality assurance in order to secure the quality of selected equipment in nuclear power. These programmes should include the evaluation of the design of the individual equipments with regard to the implementation of in-service inspection. The main problems are discussed related to the processing of the program of quality assurance for the steam generator and pressurizer. To solve these problems it is necessary that the general project designer should make a classification of the components according to safety categories and that the manufacturers should determine the weak points of the design on the basis of an analysis of the design of individual component nodes. On the basis of such an analysis it is then necessary to evaluate the existing design of the scale of in-service inspections and to decide whether or not new inspection methods should be added. (Z.M.)

  16. During the holidays, it was business as usual.

    CERN Multimedia

    2006-01-01

    On the eve of this long weekend for jeûne genevois, many of you are already back from your holidays. The Staff Association hopes you are in fine form for your return to work, which, no doubt, will not be easy. During the holidays, the Staff Association representatives, for their part, carried on with the work they had begun. We would like to inform you about this work by simply running through the list of subjects tackled. This information supplements the three previous editorials.

  17. The Impact of Climate on Holiday Destination Choice

    Energy Technology Data Exchange (ETDEWEB)

    Bigano, A. [Fondazione Eni Enrico Mattei, Milan (Italy); Hamilton, J.M. [Research unit Sustainability and Global Change, Hamburg University and Centre for Marine and Atmospheric Science, Hamburg (Germany); Tol, R.S.J. [Institute for Environmental Studies, Vrije Universiteit, Amsterdam (Netherlands)

    2006-06-15

    The holiday destination choice is analysed for tourists from 45 countries, representing all continents and all climates. Tourists are deterred by distance, political instability and poverty, and attracted to coasts. Tourists prefer countries with a sunny yet mild climate, shun climates that are too hot or too cold. A country's tourists' aversion for poverty and distance can be predicted by that country's average per capita income. The preferred holiday climate is the same for all tourists, independent of the home climate. However, tourists from hotter climates have more pronounced preferences.

  18. Health products inspection

    International Nuclear Information System (INIS)

    Stoltz, M.

    2009-01-01

    To protect public health, the Health Products Inspection is a public service mission where the application of regulations concerning activities on human health products and cosmetic products is verified. This mission permits a global approach to assess the health products risk-based benefit and, in monitoring by laboratory testing and by on site inspections, to verify their compliance with appropriate regulations. The seventy five inspectors perform about eight hundred inspections per year, in France and abroad. These inspections are related to data provided in the health products assessment and also to manufacturing and delivery practices. The French inspection body is also involved in the training of foreign inspectors and in the harmonization of national, European and international practices either for operators than for the competent authorities. (author)

  19. Design considerations, tooling, and equipment for remote in-service inspection of radioactive piping and pressure-vessel systems

    International Nuclear Information System (INIS)

    Swannack, D.L.; Schmoker, D.S.

    1983-01-01

    This paper summarizes results obtained in use of remotely-operated nondestructive testing (NDT) equipment for inspection of reactor-system components. Experience obtained in operating the Fast Flux Test Facility (FFTF) has provided a basis for field verification of remote NDT equipment designs and has suggested development improvements. Remote Viewing and data gathering systems used include periscopes, borescopes, fiberscopes, hybrid borescopes/fiberscopes, and closed circuit television. A summary of design consideration for inspection equipment and power plant design is presented to achieve improved equipment operation and reduction of plant maintenance downtime

  20. Inspection planning

    International Nuclear Information System (INIS)

    Korosec, D.; Levstek, M.F.

    2001-01-01

    Slovenian Nuclear Safety Administration (SNSA) division of nuclear and radiological safety inspection has developed systematic approach to their inspections. To be efficient in their efforts regarding regular and other types of inspections, in past years, the inspection plan has been developed. It is yearly based and organized on a such systematic way, that all areas of nuclear safety important activities of the licensee are covered. The inspection plan assures appropriate preparation for conducting the inspections, allows the overview of the progress regarding the areas to be covered during the year. Depending on the licensee activities and nature of facility (nuclear power plant, research reactor, radioactive waste storage, others), the plan has different levels of intensity of inspections and also their frequency. One of the basic approaches of the plan is to cover all nuclear and radiological important activities on such way, that all regulatory requests are fulfilled. In addition, the inspection plan is a good tool to improve inspection effectiveness based on previous experience and allows to have the oversight of the current status of fulfillment of planned inspections. Future improvement of the plan is necessary in the light of newest achievements on this field in the nuclear world, that means, new types of inspections are planned and will be incorporated into plan in next year.(author)

  1. 75 FR 3839 - Martin Luther King, Jr., Federal Holiday, 2010

    Science.gov (United States)

    2010-01-22

    ... Part III The President Proclamation 8473--Martin Luther King, Jr., Federal Holiday, 2010 Proclamation 8474--Religious Freedom Day, 2010 Notice of January 20, 2010--Continuation of the National... only by the power of his words, which still call on us to perfect those sacred ideals enshrined in our...

  2. Find Your Perfect Gift at the Holiday Markets | Poster

    Science.gov (United States)

    Winter is on its way, and that means sweaters, snow—and the NCI at Frederick’s Holiday Markets. The markets will take place on November 22 and December 20 in the Building 549 lobby and Conference Rooms from 11:00 a.m.–1:30 p.m.

  3. Decontrolled by solidarity: understanding recreational violence in moral holidays

    NARCIS (Netherlands)

    Weenink, D.

    2013-01-01

    This paper seeks to develop an understanding of ‘recreational’ youth violence against strangers in ‘moral holidays’. These are enclaves in which youth seek to enjoy disorder and disruption. Drawing on Eliasian theory and Collins’s micro-sociology of violence, it is argued that violent moral holidays

  4. Gifting with Purpose: Choose Learning Toys This Holiday Season

    Science.gov (United States)

    Exceptional Parent, 2011

    2011-01-01

    Kids aged five and under learn best through play. Instead of buying just any toy, look for toys or activities with things to teach: like the alphabet or names of different animals, and more. Children will play with their new toy and not even realize they are learning while they play. This article focuses on gift ideas for the holiday season, with…

  5. Deciding on Family Holidays - Role Distribution and Strategies in Use

    DEFF Research Database (Denmark)

    Therkelsen, Anette

    2010-01-01

    this complexity in role distribution. Likewise in relation to decision-making strategies, contextual factors are helpful in explaining the strategies used, in particular the convention that holidays are an extraordinary “free space” which allows for more negotiation power being bestowed on children than...

  6. Structural challenges of holiday placement programmes for children ...

    African Journals Online (AJOL)

    Structural challenges of holiday placement programmes for children in SOS's Children Village, Zimbabwe. ... African Journal of Social Work ... Response to child protection crisis has essentially seen the placement of orphans and other vulnerable children in residential care institutions, particularly children' homes modelled ...

  7. Observed Holiday Aerosol Reduction and Temperature Cooling over East Asia

    Energy Technology Data Exchange (ETDEWEB)

    Gong, Daoyi; Wang, Wenshan; Qian, Yun; Bai, Wenbing; Guo, Yuanxi; Mao, Rui

    2014-06-16

    The Spring Festival air pollution in China was investigated using the long-term observations from 2001-2012 over 323 stations. During the Spring Festival with nearly half of urban population leaving the cities for holidays, the particulate matter (PM10) concentration is about 24.5μgm-3 (23%) lower than normal days. Associated with the national-wide burning of firework, the PM10 concentration sharply increases to 123.8μgm-3 at Chinese New Year Day (increment of 35%). Similar to PM10, the SO2 and NO2 decrease from high values in normal days to a holiday minimum with reduction of 23.3% and 30.6%, respectively. The NO2 has no peak in New Year Day because of the different emission source. The night mean and minimum temperature co-vary with PM10. Both nighttime mean and minimum temperature decrease by about 2.1°C during the holidays. And in association with the pollution jump at New Year Day the night temperature simultaneously increase by about 0.89°C. The in-phase co-variations between PM10 and night temperature suggest an overall warming effect of holiday aerosol during winter in China.

  8. Secret Snowflake: Analysis of a Holiday Gift Exchange

    Science.gov (United States)

    Turton, Roger W.

    2007-01-01

    This article describes several methods from discrete mathematics used to simulate and solve an interesting problem occurring at a holiday gift exchange. What is the probability that two people will select each other's names in a random drawing, and how does this result vary with the total number of participants? (Contains 5 figures.)

  9. 78 FR 5247 - Martin Luther King, Jr., Federal Holiday, 2013

    Science.gov (United States)

    2013-01-24

    ..., 2013 Martin Luther King, Jr., Federal Holiday, 2013 By the President of the United States of America A... thousands upon thousands rallying for jobs and freedom, the Reverend Dr. Martin Luther King, Jr., delivered... Constitution and the laws of the United States, do hereby proclaim January 21, 2013, as the Martin Luther King...

  10. 29 CFR 4.174 - Meeting requirements for holiday fringe benefits.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Meeting requirements for holiday fringe benefits. 4.174... Compensation Standards Compliance with Compensation Standards § 4.174 Meeting requirements for holiday fringe benefits. (a) Determining eligibility for holiday benefits—in general. (1) Most fringe benefit...

  11. 37 CFR 2.196 - Times for taking action: Expiration on Saturday, Sunday or Federal holiday.

    Science.gov (United States)

    2010-07-01

    ...: Expiration on Saturday, Sunday or Federal holiday. 2.196 Section 2.196 Patents, Trademarks, and Copyrights... Saturday, Sunday or Federal holiday. Whenever periods of time are specified in this part in days, calendar... taking any action or paying any fee in the Office falls on a Saturday, Sunday, or Federal holiday within...

  12. 15 CFR 908.15 - Times for taking action; expiration on Saturday, Sunday, or holiday.

    Science.gov (United States)

    2010-01-01

    ... Saturday, Sunday, or holiday. 908.15 Section 908.15 Commerce and Foreign Trade Regulations Relating to... § 908.15 Times for taking action; expiration on Saturday, Sunday, or holiday. Whenever periods of time... under these rules for taking any action falls on a Saturday, Sunday, or on a Federal holiday, the action...

  13. 76 FR 78151 - Special Local Regulations; Boca Raton Holiday Boat Parade, Intracoastal Waterway, Boca Raton, FL

    Science.gov (United States)

    2011-12-16

    ...-AA08 Special Local Regulations; Boca Raton Holiday Boat Parade, Intracoastal Waterway, Boca Raton, FL... Raton Holiday Boat Parade on Saturday, December 17, 2011. The marine parade will consist of... through Friday, except Federal holidays. FOR FURTHER INFORMATION CONTACT: If you have questions on this...

  14. 76 FR 77119 - Special Local Regulations; Pompano Beach Holiday Boat Parade, Intracoastal Waterway, Pompano...

    Science.gov (United States)

    2011-12-12

    ...-AA08 Special Local Regulations; Pompano Beach Holiday Boat Parade, Intracoastal Waterway, Pompano Beach... Pompano Beach Holiday Boat Parade on Sunday, December 11, 2011. The marine parade will consist of... Friday, except Federal holidays. FOR FURTHER INFORMATION CONTACT: If you have questions on this temporary...

  15. The effect of the Thanksgiving Holiday on weight gain

    Directory of Open Access Journals (Sweden)

    Dinger Mary K

    2006-11-01

    Full Text Available Abstract Background More people than ever are considered obese and the resulting health problems are evident. These facts highlight the need for identification of critical time periods for weight gain. Therefore the purpose was to assess potential changes that occur in body weight during the Thanksgiving holiday break in college students. Methods 94 college students (23.0 ± 4.6 yrs, 72.1 ± 14.0 kg, 172.6 ± 9.3 cm, 24.0 ± 3.9 kg/m2 reported to the human body composition laboratory at the University of Oklahoma following a 6-hour fast with testing occurring prior to, and immediately following the Thanksgiving holiday break (13 ± 3 days. Body weight (BW was assessed using a balance beam scale while participants were dressed in minimal clothing. Paired t-tests were used to assess changes in BW pre and post Thanksgiving holiday with additional analysis by gender, body mass index (BMI, and class standing (i.e. undergraduate vs. graduate. Results Overall, a significant (P P P 2 group compared to a non significant 0.2 kg gain in the normal group (2. Conclusion These data indicate that participants in our study gained a significant amount of BW (0.5 kg during the Thanksgiving holiday. While an increase in BW of half a kilogram may not be cause for alarm, the increase could have potential long-term health consequences if participants retained this weight gain throughout the college year. Additionally, because the overweight/obese participants gained the greatest amount of BW, this group may be at increased risk for weight gain and further obesity development during the holiday season.

  16. Developments for the ultrasonic in-service inspection of the inner near surface zone of circular welds in the vessel of the fast breeder-reactor SNR 300

    International Nuclear Information System (INIS)

    Salzburger, H.J.; Huebschen, G.; Neuschwander, R.; Kleffner, G.; Wessels, J.

    1990-01-01

    For in-service, ultrasonic inspection of the inner near-surface zone of the welds 1 and 6 of the vessel of the SNR-300, an automated system has been developed for scanning, manipulation and evaluation tasks. The scanning system which currently is tested and qualified as a prototype system uses heat-resistant EMUS probes which do not require coupling agents, and which have been optimized for three different testing tasks. The required electronic equipment has also been developed to prototype stage, and both have been incorporated into the automated manipulation, data acquisition and evaluation system. (orig.) [de

  17. Development, design, construction and testing of pumps, intermediate heat exchangers and manipulator systems for in-service inspection of SNR 300

    International Nuclear Information System (INIS)

    Vroom, J.P.; Heslenfeld, M.W.; Westerweele, W.J.; Willigen, A. van

    1978-01-01

    The first part of this paper reviews the development, design, construction and testing of sodium pumps and intermediate heat exchangers as carried out by NERATOOM in the Netherlands. Testing of full-size components under operational conditions yielded important information for the design of the components for SNR 300. Information is also given in brief on the manufacture of the components. The second part reviews the work done on manipulator systems for in-service inspection as carried out by INTERATOM in Germany. In this field again experience gained from tests had important consequences for the design of the apparatus for SNR 300. (author)

  18. Study on the ultrasonic inspection method using the full matrix capture for the in service railway wheel

    Energy Technology Data Exchange (ETDEWEB)

    Peng, Jianping; Wang, Li; Zhang, Yu; Gao, Xiaorong; Wang, Zeyong; Peng, Chaoyong [NDT Research Center, School of Physical Science and Technology, Southwest Jiaotong University, Chengdu 610031 (China)

    2014-02-18

    The quality of wheel is especially important for the safety of high speed railway. In this paper, a new ultrasonic array inspection method, the Full Matrix Capture (FMC) has been studied and applied to the high speed railway wheel inspection, especially in the wheel web from the tread. Firstly, the principle of FMC and TFM algorithm is discussed, and then the new optimization is applied to the standard FMC; Secondly the fundamentals of optimization is described in detail and the performance is analyzed. Finally, the experiment has been built with a standard phased array block and railway wheel, and then the testing results are discussed and analyzed. It is demonstrated that this change for the ultrasonic data acquisition and image reconstruction has higher efficiency and lower cost comparing to the FMC's procedure.

  19. Inspection vehicle

    International Nuclear Information System (INIS)

    Takahashi, Masaki; Omote, Tatsuyuki; Yoneya, Yutaka; Tanaka, Keiji; Waki, Tetsuro; Yoshida, Tomiji; Kido, Tsuyoshi.

    1993-01-01

    An inspection vehicle comprises a small-sized battery directly connected with a power motor or a direct power source from trolly lines and a switching circuit operated by external signals. The switch judges advance or retreat by two kinds of signals and the inspection vehicle is recovered by self-running. In order to recover the abnormally stopped inspection vehicle to the targeted place, the inspection vehicle is made in a free-running state by using a clutch mechanism and is pushed by an other vehicle. (T.M.)

  20. Get all the official CERN holidays automatically added to your CERN mailbox calendar

    CERN Multimedia

    CERN Mail Services

    2013-01-01

    A new tool has been created that makes it easy to check the official CERN holidays. These holidays will appear automatically in your calendar. Currently, to check the official CERN holidays, you had to consult either the CERN website or EDH. Now you can see these holidays in your CERN calendar together with absences, meetings and other events. To take advantage of this feature: add yourself as member of the e-group “holidays-to-calendar” here. You can also use this link. Your calendar will be updated the very next day.

  1. Tridimensional ultrasonic images analysis for the in service inspection of fast breeder reactors; Analyse d'images tridimensionnelles ultrasonores pour l'inspection en service des reacteurs a neutrons rapides

    Energy Technology Data Exchange (ETDEWEB)

    Dancre, M

    1999-11-01

    Tridimensional image analysis provides a set of methods for the intelligent extraction of information in order to visualize, recognize or inspect objects in volumetric images. In this field of research, we are interested in algorithmic and methodological aspects to extract surface visual information embedded in volume ultrasonic images. The aim is to help a non-acoustician operator, possibly the system itself, to inspect surfaces of vessel and internals in Fast Breeder Reactors (FBR). Those surfaces are immersed in liquid metal, what justifies the ultrasonic technology choice. We expose firstly a state of the art on the visualization of volume ultrasonic images, the methods of noise analysis, the geometrical modelling for surface analysis and finally curves and surfaces matching. These four points are then inserted in a global analysis strategy that relies on an acoustical analysis (echoes recognition), an object analysis (object recognition and reconstruction) and a surface analysis (surface defects detection). Few literature can be found on ultrasonic echoes recognition through image analysis. We suggest an original method that can be generalized to all images with structured and non-structured noise. From a technical point of view, this methodology applied to echoes recognition turns out to be a cooperative approach between morphological mathematics and snakes (active contours). An entropy maximization technique is required for volumetric data binarization. (author)

  2. SOME RECENT ISSUES REGARDING THE BEHAVIOR OF THE ROMANIAN TOWNSPEOPLE DURING THE WINTER HOLIDAYS

    Directory of Open Access Journals (Sweden)

    TOMA ANDREI

    2017-04-01

    Full Text Available This paper aims to present several aspects of the behavior of the Romanian townspeople in the recent years, on the occasion of the winter holidays. I made an indirect research, based on secondary data sources. Many sources I used are from past years. Sometimes, the secondary sources can provide very valuable data at a national level. The most important Romanian holidays are the winter ones (Saint Nicholas, Christmas, New Year's Eve. There are also other winter holidays, but of lesser importance. The Romanians are traditionalists; they cherish the winter holidays and the family. Giving holiday gifts (sweets, clothing, footwear, perfumes, cosmetics, toys to family members and to close relatives is a feature of Romanian townspeople behavior during the main winter holidays. Most Romanian townspeople spend the winter holidays at home or at friends. During the economic crisis, reduction of costs included also the expenses intended for winter holidays. Changes in the behavior of Romanian tourists, due to the economic crisis, included especially the reduction in the number of holidays, the reduction of the duration of the holiday, avoidance of foreign destinations. This paper does not refer to all the aspects of the purchasing behavior or consumption of the Romanians townspeople on the occasion of winter holidays, but only to some aspects.

  3. Application of non-destructive testing and in-service inspection to research reactors. Results of a co-ordinated research project

    International Nuclear Information System (INIS)

    2001-12-01

    -destructive testing (NDT), are generally called in-service inspections (ISI) and, together with the above specific techniques, are the subject of the present TECDOC. The main objectives of the TECDOC are to present a number of these special techniques and to give guidance for their application. The guidance and recommendations given in this publication form the basis for the conduct of ISI of research reactors with limited hazard potential to the public. This TECDOC is based on the results of a Co-ordinated Research Project (CRP) on the Application of Non-destructive Testing and In-service Inspection to Research Reactors that the IAEA organized in 1995 to supplement its activities on research reactor ageing within its Research Reactor Safety Programme (RRSP). Because of the importance of such in-service inspections within the programmes for the management of ageing in research reactors, this TECDOC will be useful to a large fraction of the currently operating research reactors that are over 30 years old

  4. Secondary side corrosion in steam generator tubes: lessons learned in France from the in-service inspection results

    International Nuclear Information System (INIS)

    Comby, R.

    1997-01-01

    Non-destructive testing (NDT) has proved to be very important in the maintenance of steam generator tubing. This is particularly true in the case of secondary side corrosion, because this type of degradation leads to various morphologies which are often complex (intergranular attack) (IGA), intergranular stress corrosion cracking (IGSCC), or a mixture of both. Their detection and characterization by the usual NDT techniques have been achieved through numerous laboratory studies, which were conducted in order to determine the performance and limitations of NDT. Pulled tube examination in a hot laboratory was very valuable, for both NDT and fracture mechanics aspects. The eddy current bobbin coil probe, used for multipurpose inspection of tubes, allows the detection of IGA-SCC at the tube support plate elevation. In France, the use of rotating probes is not required for that type of degradation, since the repair criterion is based on bobbin coil results only. The bobbin coil is also used for detection of IGSCC occurring in free spans, within sludge deposits. The eddy current rotating probe allows, in that case, characterization of main cracks. Concerning the outer diameter initiated circumferential cracks which occur at the top of the tube sheet, only the rotating probe is used. An ultrasonic (UT) inspection was performed several times, in order to obtain information on UT capabilities. The goal of tube inspection is obviously knowledge of the status of steam generators, but also to follow up degradations and to estimate their revolution, and to verify the beneficial effect of some corrective measures, e.g. boric acid injection. (orig.)

  5. Development of technology for the in-service inspection of reactor pressure vessel metal condition using a magnetic method

    International Nuclear Information System (INIS)

    Bakirov, M. B.; Zabruskov, N.Y; Massoud, J.P.

    2002-01-01

    The opportunity to perform the inspection of condition of base metal and metal of welded joints of cladded vessels of PWR by non destructive methods is shown. The technique for on-site specimen-free testing is offered on the basis of sharing a kinetic hardness method and magnetic method. The results of studies of magnetic and mechanical properties of vessel steels in various condition after irradiation and thermal processing are submitted. It is shown, that the magnetic properties (first of all coercive force) are sensitive to change of structure of a material. (authors)

  6. Eco-efficiency of holiday homes; Vapaa-ajan asumisen ekotehokkuus

    Energy Technology Data Exchange (ETDEWEB)

    Rytkoenen, A.; Kirkkari, A.-M. (eds.) (Work Efficiency Inst., Rajamaeki (Finland))

    2010-03-15

    The study is part of the Environmental Cluster Research Programme of the Ministry of the Environment and was done by seven research institutes. The study examined holiday homes in terms of their potential for enhancing sustainable consumption and eco-efficiency. The research focused on: constant heating and frost-proof plumbing, their acceptability, use of services and future needs, the operating requirements for home appliances, travel to cottages, and their macroeconomic effects. Next to construction and repair services summer cottage owners were interested in improvement of transport and health care services, telecommuting and the installation of constant heating systems and frost-proof plumbing. As of 2008, there were approximately 478,000 summer cottages. Each year, 4,000 new cottages are built, while 3,000 old cottages are extended, repaired and partly rebuilt so that they are almost like new buildings. Approximately 76 percent of all cottages are connected to the power grid. Just under one-third of all cottages are fitted for year-round use. Raising the level of cottage amenities increases their utilisation rate and energy consumption. Traditional, primarily summer-use cottages with wood-burning heat, bucket-drawn water and dry toilets are eco-efficient. Heating and travelling to cottages are the largest consumers of energy in cottage living. Travelling to cottages consumes approximately 1,070 GWh per year. The more that various electric appliances are used in the cottages and the more comfortable they become, the more often they are visited also during winter time and the higher are the energy and emission bills. Traffic to the holiday homes increases also because of growing mean distances between peopleAEs main residences and cottages and because of increased visits to friendsAE and relativesAE cottages and to rented holiday housing in Lapland and elsewhere. In 2005 total cottage electricity consumption was approximately 900 GWh/year. The average

  7. Holiday Decorating Contest - A Way to Meet Fellow Employees | Poster

    Science.gov (United States)

    The trolls from “Frozen,” a North Pole tunnel, and a Christmas tree­–shaped periodic table of elements were just a few of the decorations on display during the second annual Holiday Decorating Contest in December. The contest, sponsored by the R&W Club Frederick, awarded prizes to three groups and two individuals whose decorations were judged based on visual impact,

  8. New HOLIDAY Destination Decision Making; a Singapore perspective

    OpenAIRE

    Bhagchandani, Neeraj Vishindas

    2015-01-01

    Singaporeans are known to have high disposable incomes and come from one of the more influential economies in Asia. Singaporeans have a sizeable impact on the world’s tourism industry. Thus, it is not surprising that they are the target of many tourism destination marketing organizations. Influencing this segment bears great international interest. Existing research identifies the many methods new destinations enter the holiday maker’s mind and move along the destination decision making p...

  9. Holiday CO2: Inference from the Salt Lake City data

    Science.gov (United States)

    Ryoo, J.; Fung, I. Y.; Ehleringer, J. R.; Stephens, B. B.

    2013-12-01

    A network of high-frequency CO2 sensors has been established in Salt Lake City (SLC), Utah (http://co2.utah.edu/), and the annual/monthly pattern of CO2 variability is consistent with a priori estimates of CO2 fluxes (McKain et al., 2012). Here we ask if short-term changes in anthropogenic sources can be detected, and present a case study of Thanksgiving holiday, when traffic and energy use patterns are expected to be different from that during the rest of the month. CO2 mole fraction is much higher during the Thanksgiving holidays than the other days in November 2008 for all 5 sites in SLC, and a similar pattern is found in other years. Taking into account that the wind speed is relatively low in downtown SLC compared to the other SLC sites, the downtown site is further investigated to minimize the meteorological influence on CO2. In order to understand the relative contributions to the high level of CO2 during the Thanksgiving holidays, we carried out a multiple linear regression (MLR) analysis of the rate of CO2 change against various sources. Mobile CO2 sources are assumed to be proportional to local traffic data and residential CO2 sources are assumed to depend exponentially on temperature. Vulcan data were used to specify the other anthropogenic sources (commercial, industrial, nonroad, electricity, aircraft, and cement). The MLR analysis shows that during the Thanksgiving holidays CO2 contributions from residential and commercial CO2 are larger than that during the rest of November, and mobile sources represent only a relatively small contribution. The study demonstrates the feasibility of detecting changes in urban source contributions using high-frequency measurements in combination with daily PBL height and local traffic volume data.

  10. STRATEGI PEMASARAN PAKET WISATA DI BALI EASY HOLIDAY DENPASAR BALI

    OpenAIRE

    Erick Kevin Perangin-Angin; I Putu Sudana; I Nyoman Sudiarta

    2017-01-01

    This Journal aimed to know the strengths and weaknesses of the internal environment and opportunities as well as threats from the external environment and create strategies and marketing programs that can be applied in the Bali Easy Holiday. The technique data collection using observation, interview, questionnaire, the study of literature and documentation study. Sampling techniques using a purposive sampling. Data analysis techniques using qualitative descriptive analysis and Likert scale an...

  11. Analysis of in-service inspection guides for post-tensioning systems in containment structures with greased tendons

    International Nuclear Information System (INIS)

    Bae, I. H.; Choi, I. G.; Seo, J. M.

    2000-01-01

    Prestressed concrete containments(PCC) are inspected periodically to ensure structural integrity and to identify and correct problems before they come critical. These inspections are conducted in accordance with the Nuclear Regulatory Committee(NRC) Regulatory Guide. As experience with the surveillance mounts, the guide is revised to keep pace with technological advances in containment design and to reflect the knowledge obtained experience. In the study, an analysis of the available utility surveillance data and an evaluation of the NRC Regulatory Guide and the ASME Code are conducted. The results indicate that the average value of the lower bound defined in Regulatory Guide 1.35.1 can be less than the minimum required force level at 40 years for the existing containment and thus an acceptable alternative has to be presented to meet the allowance of the guide. Tendons in excess of the upper bound or 70% of the ultimate tensile strength of the tendon are observed. Such an occurrence indicates tendon behavior outside the tolerance band that expected, and the cause of such behavior has to be investigated. It is shown that the behavior of the predicted prestressing force with time based on assumed losses does quite different from that of the measured tendon force with time and, therefore, studies for the significant factors, such as shrinkage and creep of concrete, that influence the time-dependent losses in PCC are needed. Additional research on the long-term effects of the impurity levels on the effectiveness of the grease seems justified

  12. Stress, Immune Function and Collegiate Holiday Drinking: A Pilot Study.

    Science.gov (United States)

    Ceballos, Natalie A; Sharma, Shobhit; Patterson, Thomas L; Graham, Reiko; Howard, Krista

    2015-01-01

    Social aspects of collegiate holiday drinking have been studied frequently, but physiological consequences are often overlooked. This study examined self-reported stress, endocrine and immune indicators in students at an American university before and after their week-long spring break (SB) holiday. Participants (n = 27; 9 males) provided saliva samples and completed surveys pre- and post-SB. Based on their cortisol reaction to SB, participants were grouped as cortisol nonresponders (CNR; n = 14) or increasers (CI; n = 13). Groups were matched on demographics, baseline alcohol use, family history of alcoholism, and SB plans. Differences over time and between groups were examined for α-amylase, quantity/frequency of alcohol use (quantity/frequency index, QFI) and the immunoglobulin A (IgA) to albumin ratio (IgA:albumin). α-Amylase decreased over time. A time × group interaction was noted for QFI, in which CNRs increased drinking over SB, but CIs did not. Time and time × group effects occurred for IgA:albumin. CIs decreased IgA:albumin over SB, whereas CNRs did not. Pre-SB QFI and pre-/post-SB QFI changes were correlated with changes in IgA:albumin. These findings support previously published relationships between blunted cortisol responses and risk for problem drinking, as well as elevated cortisol and decreased immune response. These data also highlight the importance of physiological measures in the study of collegiate holiday drinking. © 2015 S. Karger AG, Basel.

  13. 7 CFR 927.60 - Inspection and certification.

    Science.gov (United States)

    2010-01-01

    ... WASHINGTON Order Regulating Handling Inspection § 927.60 Inspection and certification. (a) Handlers shall ship only fresh pears inspected by the Federal-State Inspection Service or under a program developed by... 7 Agriculture 8 2010-01-01 2010-01-01 false Inspection and certification. 927.60 Section 927.60...

  14. Profiles of illicit drug use during annual key holiday and control periods in Australia: wastewater analysis in an urban, a semi-rural and a vacation area.

    Science.gov (United States)

    Lai, Foon Yin; Bruno, Raimondo; Hall, Wayne; Gartner, Coral; Ort, Christoph; Kirkbride, Paul; Prichard, Jeremy; Thai, Phong K; Carter, Steve; Mueller, Jochen F

    2013-03-01

    To examine changes in illicit drug consumption between peak holiday season (23 December-3 January) in Australia and a control period two months later in a coastal urban area, an inland semi-rural area and an island populated predominantly by vacationers during holidays. Analysis of representative daily composite wastewater samples collected from the inlet of the major wastewater treatment plant in each area. Three wastewater treatment plants. Wastewater treatment plants serviced approximately 350, 000 persons in the urban area, 120,000 in the semi-rural area and 1100-2400 on the island. Drug residues were analysed using liquid chromatography coupled to a tandem mass spectrometer. Per capita drug consumption was estimated. Changes in drug use were quantified using Hedges' g. During the holidays, cannabis consumption in the semi-rural area declined (g = -2.8) as did methamphetamine (-0.8), whereas cocaine (+1.5) and ecstasy (+1.6) use increased. In the urban area, consumption of all drugs increased during holidays (cannabis +1.6, cocaine +1.2, ecstasy +0.8 and methamphetamine +0.3). In the vacation area, methamphetamine (+0.7), ecstasy (+0.7) and cocaine (+1.1) use increased, but cannabis (-0.5) use decreased during holiday periods. While the peak holiday season in Australia is perceived as a period of increased drug use, this is not uniform across all drugs and areas. Substantial declines in drug use in the semi-rural area contrasted with substantial increases in urban and vacation areas. Per capita drug consumption in the vacation area was equivalent to that in the urban area, implying that these locations merit particular attention for drug use monitoring and harm minimisation measures. © 2012 The Authors, Addiction © 2012 Society for the Study of Addiction.

  15. Impact of urbanization on the air pollution “holiday effect” in Taiwan

    Science.gov (United States)

    Tan, Pei-Hua; Chou, Chia; Chou, Charles C.-K.

    2013-05-01

    The spatio-temporal characteristics of the “holiday effect”, defined as the difference in air pollutant concentrations between the holiday (Chinese New Year) and non-holiday periods during 1994-2008, and its association with the degree of urbanization in Taiwan are examined. Daily surface measurements of six major pollutants from 54 monitoring stations of the Taiwan Environmental Protection Administration are used. Holiday effects are found for almost all air pollutants in all divisions and individual stations. A widespread holiday effect with consistent signs suggests a high degree of urbanization over Taiwan. Holiday effects are stronger in the west than in the east, due to urban-rural differences, and have a distinct north-south difference in the west, due to different emission sources. In the spatial distribution, as the population (motor vehicle) number in the division increases, holiday effects of NOx, CO and NMHC are intensified. Holiday effects of pollutants can also be stronger when the associated dominant anthropogenic sources in the division have larger emissions. Both imply the association of a stronger holiday effect with a higher degree of urbanization in the division. In the temporal variation, on the other hand, holiday effects and pollutant concentrations tend to weaken and reduce in almost all the urban divisions for all six pollutants except O3. These weakening trends imply possible contributions of other effects, such as the mature state of urbanization for the urban division, the effective pollution-control measures and behavioral pattern changes.

  16. Evolution in the design and development of the in-service inspection device for the Indian 500 MWe Fast Breeder Reactor

    International Nuclear Information System (INIS)

    Singh, Ashutosh Pratap; Rajagopalan, C.; Rakesh, V.; Rajendran, S.; Venugopal, S.; Kasiviswanathan, K.V.; Jayakumar, T.

    2011-01-01

    Highlights: → Conceptual study on the configuration of an ISI device for FBR interspace environment has been carried out. → Prototyping of the concept has been experimentally validated in a mock up. → High temperature version of the ISI device has been made and tested in mock-up. Further experimentation is underway. → Simulation of different configurations of the device has been carried out with respect to reduced gap between main vessel and safety vessel for future FBRs. → Studies on wheel lining for the device have been carried out at 150 o C for better traction and payload capability. - Abstract: In-service inspection (ISI) plays a major role in monitoring the condition of nuclear power plant structures and components. Based on the information gathered during inspection and the studies carried out, it is possible to assess the extent of damage and take corrective measures to keep effects of ageing under control. In nuclear power plants comprehensive ISI is dictated by issues of increased safety to personnel and equipment, and efficiently enhances the plant life. A special emphasis has been laid on the development of robotic devices for the ISI of the indigenous Indian 500 MWe Prototype Fast Breeder Reactor (FBR) components. This paper traces the experiments and simulations in the key developments of a robotic device, for the ISI of main vessel and safety vessel of FBRs, carried out at Indira Gandhi Centre for Atomic Research, India.

  17. Qualification of NDT techniques for in-service inspections in nuclear power plants in accordance with ENIQ - examples and lessons - learned

    International Nuclear Information System (INIS)

    Just, T.; Csapo, G.

    2006-01-01

    ENIQ (European Network for Inspection and Qualification) has developed regulations on how to qualify non-destructive testing (NDT) methods and techniques in a standardized and structured manner. Two major innovative qualifications were carried out and reviewed with regard to implementation, according to the recommended German practice of ENIQ. The conclusions were drawn after performing the ENIQ qualification procedure for in-service inspections (ISI) of real components in nuclear power plants (NPP). The first example covers the qualification of NDT methods for the detection and characterization of surface, subsurface and underclad cracks in the area of the austenitic cladded RPV surface. Open and blind tests were conducted applying UT and ET (from the ID) and UT (from the OD) on realistic flaws (artificially induced IGSCC, hot cracks and fatigue cracks) in the cladding of a full scale RPV mock-up from MPA Stuttgart. The second example covers the qualification of mechanised RT in combination with tomography (developed by the BAM) for the sizing of cracks in pipe welds. For both qualification procedures TUEV NORD SysTec experts were part of the qualification body. The proposed NDT procedures have been qualified within defined limits of application. Recommendations were made to optimise the procedures and the techniques itself further. (orig.)

  18. 46 CFR 2.10-101 - Annual vessel inspection fee.

    Science.gov (United States)

    2010-10-01

    ... inspections, damage surveys, repair and modification inspections, change in vessel service inspections, permit... of international certificates. (d) Entitlement to inspection services for the current year remains... MODUs 4,695 Semi-submersible MODUs 8,050 Nautical School Vessels: Length not greater than 100 feet 835...

  19. Drug Holidays From ADHD Medication: International Experience Over the Past Four Decades.

    Science.gov (United States)

    Ibrahim, Kinda; Donyai, Parastou

    2015-07-01

    ADHD is managed by stimulants that are effective but can cause growth retardation. Prescribers should ideally monitor children and trial a "drug holiday" to enable catch-up growth. Our aim was to map the experience of drug holidays from ADHD medication in children and adolescents. A comprehensive search of the literature identified 22 studies published during the period 1972 to 2013. Drug holidays are prevalent in 25% to 70% of families and are more likely to be exercised during school holidays. They test whether medication is still needed and are also considered for managing medication side effects and drug tolerance. The impact of drug holidays was reported in terms of side effects and ADHD symptoms. There was evidence of a positive impact on child growth with longer breaks from medication, and shorter breaks could reduce insomnia and improve appetite. Drug holidays from ADHD medication could be a useful tool with multiple purposes: assessment, management, prevention, and negotiation. © 2014 SAGE Publications.

  20. Variation of heart transplant rates in the United States during holidays.

    Science.gov (United States)

    Grodin, Justin L; Ayers, Colby R; Thibodeau, Jennifer T; Mishkin, Joseph D; Mammen, Pradeep P A; Markham, David W; Drazner, Mark H; Patel, Parag C

    2014-08-01

    Some cardiac transplant programs may upgrade listed patients to United Network for Organ Sharing (UNOS) 1A-status during the holidays. Whether more transplants actually occur during holidays is unknown. We assessed rates of single-organ heart transplantation from 2001 to 2010 for recipients age ≥18 yr using the UNOS database. Patients were stratified by transplantation during holiday (±3 d, n = 2375) and non-holiday periods (n = 16 112). Holidays included Easter/Spring break, Memorial Day, July 4th, Labor Day, Thanksgiving, and Christmas/New Years (winter holidays). Secondary analysis assessing transplant rates across seasons was also completed. Donor and recipient characteristics were similar between groups. Compared with non-holidays, July 4th had higher transplant rates (5.69 vs. 5.09 transplants/d, p = 0.03) while the winter holiday had lower transplant rates (4.50 vs. 5.09 transplants/d, p < 0.01). There was a trend toward lower transplant rates for all holidays compared with non-holidays (p = 0.06). Transplant rates were significantly different across seasons with greater rates in spring and summer (p < 0.01). Heart transplant rates were higher during the July 4th and lower during the winter holidays. Although there was a higher likelihood of transplantation during the spring and summer seasons, upgrading patients to 1A status during most holidays may not improve their chances for transplantation. © 2014 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.

  1. To the application of TV and optical equipment for in-service inspection of reactor vessel and primary circuit component materials

    International Nuclear Information System (INIS)

    Afonin, Eh.M.; Bachelis, I.M.; Tokarev, E.A.; Yastrebov, V.E.

    1985-01-01

    Some problems of application of TV and optical equipment for inspection of reactor vessel and primary circuit component materials are considered taking the most widespread WWER-440 type reactor as an example. The most advanrageous objects of the inspection and typical zones of equipment arrangement are shown. Methods and peculiarities of the inspection with the use of TV and optical equipment are presented. Recommendations on rational application of the equipment for the inspection of WWER-440 reactor vessel components are given

  2. Observed holiday aerosol reduction and temperature cooling over East Asia

    Science.gov (United States)

    Gong, Dao-Yi; Wang, Wenshan; Qian, Yun; Bai, Wenbing; Guo, Yuanxi; Mao, Rui

    2014-06-01

    The air pollution in Chinese Spring Festival (CSF) period over eastern China was investigated using the long-term observations from 2001 to 2012 over 323 stations. The dominant feature of the pollutants around the CSF holidays is the significant reduction of concentration. During the 10day period around the CSF (but excluding the Lunar New Year's Day, LNYD), PM10 experiences a reduction of -9.24%. In association with the aerosol reduction, temperature significantly drops over eastern China. From the third day before the LNYD to the second day after, the daily mean temperature anomaly is -0.81°C, and for no-rain days the anomaly is -0.85°C. The simultaneous anomalies of the daily maximum and minimum temperatures are -0.79°C and -0.82°C, respectively. From the third day to seventh day after the LNYD, the significant negative temperature anomalies move out of China, extending to a broad area from the South China Sea to the western North Pacific. Between the 8th and the 12th days, the significant temperature anomalies can still be found over 140°E-160°E and 15°N-25°N. The reduced downward longwave flux might play an important role in holiday cooling. The possible atmospheric feedback is discernable. The thermal and circulation configuration accompanying the cooling favors baroclinic interaction between upper and lower troposphere for the midlatitude cyclone. The anomalous cyclone becomes mature during the third to the seventh day after the LNYD and disappears 12 days later. The anomalous northern winds in association with the cyclone decrease the temperature and also help disperse the holiday aerosols over eastern China.

  3. Opinion on the demonstration of the 900 MWe reactor vessels in-service behaviour after their third decennial inspection

    International Nuclear Information System (INIS)

    2010-01-01

    In this report, an expert group comments and assesses how sufficient are the demonstration and the actions performed by EDF to justify the in-service behaviour of nuclear reactor vessels. More precisely, it comments and discusses the different steps of the EDF demonstration: follow-up of the fluence received by the vessels, identification of the most severe transients and thermodynamic calculations, behaviour of irradiated materials, mechanical analysis, in-service control and follow-up plan, ageing management. Recommendations are then formulated

  4. Epidemiology of pediatric holiday-related injuries presenting to US emergency departments.

    Science.gov (United States)

    D'Ippolito, Anthony; Collins, Christy L; Comstock, R Dawn

    2010-05-01

    The objective of this study was to calculate injury rates and describe the epidemiology of holiday-related injuries among children who were aged holiday-related injuries obtained from the US Consumer Product Safety Commission's National Electronic Injury Surveillance System were analyzed. From 1997 through 2006, an estimated 5,710,999 holiday-related injuries sustained by children who were aged holidays were classified as sports and recreation-related. In addition, home structure-related and home furnishing-related injuries were prevalent. Injuries that were associated with fireworks were more likely to occur on the Fourth of July than any other holiday, yet fireworks accounted for only a small proportion of Fourth of July injuries. Most injuries that were sustained on holidays and required ED treatment were not holiday-specific but were associated with more general activities. Parents should be aware that holidays present a risk not only for holiday-specific injuries but also for more general, "everyday" injuries.

  5. MAURITIUS: A SUNNY HOLIDAY DESTINATION FOR FINNISH PEOPLE

    OpenAIRE

    Goburdhun Bhurtun, Ishina

    2016-01-01

    The tourism market of Mauritius is booming as tourists are nowadays coming from many countries, thus improving the economy of the island. However, few Finnish tourists travel to Mauritius as it is still not well-known among Finns. The aim of this study is to find out how Mauritius can be promoted as a holiday destination in Finland. This study was conducted via an analysis of the tourism business environment and interviews. The analytical tools used were a SWOT analysis and Porter’s five ...

  6. Boresonic inspection of power plant rotors

    International Nuclear Information System (INIS)

    Rennie, I.S.

    1990-01-01

    Continental Field Machining and NEI Parsons together are able to provide an on site machining and boresonic inspection service. NEI Parsons existing boresonic equipment is described together with a summary of results obtained during the inspection of eighty rotors. A computer controlled automatic inspection system, planned to be in operation early in 1990, is also described

  7. 75 FR 34418 - Tobacco Inspection and Grading Services: Notice of Request for an Extension and Revision of a...

    Science.gov (United States)

    2010-06-17

    ... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service [AMS-CN-10-0042; CN-10-004] Tobacco... number and page number of this issue of the Federal Register. All comments received will be made... INFORMATION: Title: Reporting and Recording Requirements for 7 CFR part 29. OMB Number: 0581-0056. Expiration...

  8. Operational inspections

    International Nuclear Information System (INIS)

    Bystersky, M.

    1997-01-01

    Special equipment is described, designed for inspection of reactor pressure vessels performed from the inside. Central shaft manipulator ZMM-5 is available for crack detection control using ultrasound and eddy currents, for visual check of surfaces, repair works at the reactor pressure vessel, and hardness measurements. The manipulator consists of the manipulator bridge, a cable container, shaft segments, a control mechanism and auxiliary parts. Eight inspections were performed at the Bohunice nuclear power plant and two at the Paks nuclear power plant. (M.D.)

  9. 77 FR 31190 - Revised Service Standards for Market-Dominant Mail Products

    Science.gov (United States)

    2012-05-25

    ... the fall election and holiday mailing cycles, and resume it thereafter. The Postal Service will begin... holiday, the service standard is calculated from the next Postal Service delivery day. CETs are not... destinates in Alaska, Hawaii, American Samoa, Guam, Puerto Rico, or the U.S. Virgin Islands will remain one...

  10. Methodology for the analytical assessment of defects of detected in pressure vessels during the in-service inspection

    International Nuclear Information System (INIS)

    Perez Marrero, Leonel

    1996-01-01

    This work analyses the principal phenomena that can give rise to breakage during the service of the vessels of component owing to a degradation of the structure of the materials that cause or provoke cracking and which are the result of effort and fatigue and corrosion. Also appear the most frequent places in which cracking occurs, and its characteristics. Furthermore, an analysis is made of the different factors-metallurgical and mechanical-which influence on the temperature of transition as well as some criteria to evaluate the fragile behaviour

  11. After-production and in-service inspections of components of nuclear power plant primary coolant circuits

    International Nuclear Information System (INIS)

    Slama, K.; Svetlik, M.

    1990-01-01

    A new diagnostic system was developed for detecting defects in the material of mechanically loaded equipment. It is based on the measurement of elastic strain waves propagating through the materials. The instrument units as well as the methodology and software are of Czechoslovak origin and can be modified to conform to the requirements and experience of the user. The way of applying the method to the diagnostics of pressure vessels, main circulation pumps of the pressurizers and of the primary piping is described. Some results of after-production and in-service acoustic emission tests are given, as are the technical parameters of the acoustic emission analyzer. (M.D.). 5 figs

  12. 29 CFR 778.205 - Premiums for weekend and holiday work-example.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 3 2010-07-01 2010-07-01 false Premiums for weekend and holiday work-example. 778.205....205 Premiums for weekend and holiday work—example. The application of section 7(e)(6) may be illustrated by the following example: Suppose an agreement of employment calls for the payment of $7.50 an...

  13. Fasten Your Seatbelts: Holiday Issues with Children and Youth in Residential Treatment

    Science.gov (United States)

    Cotten, Christopher

    2009-01-01

    Employees working in residential treatment know from experience that holidays will be stressful and treacherous for the children and youth placed in their programs (and, consequently, for the staff themselves). Using a multiple systems approach, this article examines risk factors for holiday-related stress and crisis in residential settings…

  14. Learning never goes on holiday: an exploration of social tourism as a context for experiential learning

    NARCIS (Netherlands)

    Bos, L.D.H.; McCabe, S.; Johnson, S.

    2015-01-01

    This paper applies Experiential Learning Theory to examine learning experiences of UK children during a holiday to assess the potential of holidays as influencing factors in educational achievement and attainment. The paper presents findings from a study undertaken with low-income families who had

  15. Holidays in the Public School Kindergarten: An Avenue for Emerging Religious and Spiritual Literacy.

    Science.gov (United States)

    Myers, Michal Elaine; Myers, Barbara Kimes

    2002-01-01

    Addresses holidays in the curriculum and concerns raised for educators about how to be inclusive and recognize students' different cultures. Presents a sample approach to exploring holidays in the classroom, including techniques for brainstorming, celebration activities, children's individual experiences, expanding experiences, engaging families,…

  16. Need a Last-Minute Gift? Holiday Market Is Coming December 23 | Poster

    Science.gov (United States)

    By Carolynne Keenan, Contributing Writer If you are still looking for the “perfect” gift, mark your calendar for the Holiday Market. The December Holiday Market is set for Tuesday, Dec. 23, in Building 549, from 10:30 a.m. to 2 p.m. (or until vendors sell out).

  17. 5 CFR 610.407 - Premium pay for holiday work for employees on compressed work schedules.

    Science.gov (United States)

    2010-01-01

    ... schedule who performs work on a holiday is entitled to basic pay, plus premium pay at a rate equal to basic pay, for the work that is not in excess of the employee's compressed work schedule for that day. For... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Premium pay for holiday work for...

  18. 3 CFR 8340 - Proclamation 8340 of January 15, 2009. Martin Luther King, Jr., Federal Holiday, 2009

    Science.gov (United States)

    2010-01-01

    ... Proclamation 8340 of January 15, 2009 Proc. 8340 Martin Luther King, Jr., Federal Holiday, 2009By the President of the United States of America A Proclamation On the Martin Luther King, Jr., Federal Holiday, we... Constitution and laws of the United States, do hereby proclaim January 19, 2009, as the Martin Luther King, Jr...

  19. Purim: Transformation of the role of the holiday in the life of Belgrade Jewish community

    Directory of Open Access Journals (Sweden)

    Blagojević Gordana

    2016-01-01

    Full Text Available The focus of this research is on the function of the holiday Purim in the life of Belgrade Jewish community. In diachronic perspective we are looking at general and local characteristics of the holiday, and different levels of its celebration (private, public sphere. In the studied community this holiday has undergone a transformation from a religious to a secular feast followed by revitalization of its religious context. This paper analyzes the mechanisms of various levels of recovery and conceptualization of this holiday, on the institutionalized level and in the form of spontaneous personal initiatives. We are looking at different functions of this holiday in broad social context and their diachronic changes. [Projekat Ministarstva nauke Republike Srbije, br. 177027: Multietnicitet, multukulturalizam, migracije savremeni procesi

  20. One week's holiday sun exposure induces expression of photoaging biomarkers.

    Science.gov (United States)

    Lesiak, Aleksandra; Rogowski-Tylman, Michal; Danilewicz, Marian; Wozniacka, Anna; Narbutt, Joanna

    2016-01-01

    Skin aging is accompanied by the upregulation of the expression of various matrix metalloproteinases (MMPs). It was shown that exposure to ultraviolet radiation (UVR) may induce skin expression of MMPs and dysregulation of the transforming growth factor beta (TGF-β)/Smad pathway. The aim of our study was to compare the effects of short holiday UVR exposure and lifetime UVR exposure, on the expression of MMP-8, TGF-β1, and Smad2 in human skin biopsies. Skin biopsies were taken from the outer upper arm of 15 elderly people with significant photoaging (mean age 64.1 years) (Group 1) and from 15 healthy young adult volunteers (mean age 24.1 y) who participated in a six-day sun holiday. Biopsies were taken twice: 24 hours before leaving for holiday (Group 2a) and 24 hours after returning (Group 2b). The expression of TGF-β1, Smad2, and MMP-8 was examined by immunochemistry and measured semiquantitatively by two independent pathologists. The mean expression of TGF-β1 in dermal fibroblasts and keratinocytes in Group 1 and Group 2b was significantly lower than in Group 2a (0.54% ± 0.44% and 0.48% ± 0.51% vs. 1.48% ± 0.72%, respectively). The percentage of Smad2 (+) cells in Group 1 and Group 2b was lower than in Group 2a (2.13% ± 1.39% and 1.81% ± 1.16% vs. 4.13% ± 1.58%, respectively). The MMP-8 expression in Group 2b was 1.36% ± 0.68% and was significantly higher than in Group 1 (0.34% ± 0.42%) and Group 2a in which the protein was not detected (p < 0.001). We conclude that the decrease in the expression of TGF-β1 and Smad2 is a persistent biomarker of skin photoaging, while the increased expression of MMP-8 in keratinocytes can be regarded as a marker of acute sun exposure.

  1. Regulatory inspection in Spain

    International Nuclear Information System (INIS)

    Alvarez de Buergo, L.

    1977-01-01

    The 1964 Act on Nuclear Energy lays down that the Junta de Energia Nuclear is responsible for assessing the hazards of and inspecting nuclear power plants as well as for the transport of nuclear fuel for these plants. The Junta de Energia Nuclear has a specialised service, the Nuclear Safety Department in charge of performing these duties. Experience acquired from work in this field is analysed in this paper. (NEA) [fr

  2. The paradox of public holidays: Hospital-treated self-harm and associated factors.

    Science.gov (United States)

    Griffin, Eve; Dillon, Christina B; O'Regan, Grace; Corcoran, Paul; Perry, Ivan J; Arensman, Ella

    2017-08-15

    Recent research on the patterns of self-harm around public holidays is lacking. This study used national data to examine the patterns of hospital-treated self-harm during public holidays, and to examine associated factors. Data on self-harm presentations to all emergency departments were obtained from the National Self-Harm Registry Ireland. The association between self-harm presentations and public holidays was examined using univariate and multivariate Poisson regression analyses. A total of 104,371 presentations of self-harm were recorded between 2007 and 2015. The mean number of self-harm presentations was 32 on public holidays. St. Patrick's Day had the highest number of presentations compared to all other public holidays, with a daily mean of 44 presentations. Across all years, self-harm presentations during public holidays had a 24% increased risk of involving alcohol consumption compared to all other days and this effect was most pronounced during the Christmas period. The association with alcohol remained significant at a multivariate level. Presentations on public holidays were more likely to attend out of normal working hours. An increase in male presentations involving self-cutting was observed on public holidays and there was an over-representation of males presenting for the first time. It is likely that extent of alcohol involvement in self-harm presentations reported here is an underestimate, as it was dependent on the information being recorded by the attending clinician. Public holidays are associated with an elevated number of self-harm presentations to hospital, with presentations to hospital involving alcohol significantly increased on these days. Hospital resources should be targeted to address increases during public holidays, including during out-of-hours. Involvement of alcohol may delay delivery of care to these patients in emergency settings. Copyright © 2017 Elsevier B.V. All rights reserved.

  3. Development of a Versatile Ultrasonic Internal Pipe/Vessel Component Monitor for In-Service Inspection of Nuclear Reactor Components

    Energy Technology Data Exchange (ETDEWEB)

    Searfass, Clifford T. [Structural Integrity Associates, Inc., State College, PA (United States); Malinowski, Owen M. [Structural Integrity Associates, Inc., State College, PA (United States); Van Velsor, Jason K. [Structural Integrity Associates, Inc., State College, PA (United States)

    2015-03-22

    The stated goal of this work was to develop a versatile system which could accurately measure vessel and valve internal vibrations and cavitation formation under in-service conditions in nuclear power plants, ultrasonically. The developed technology will benefit the nuclear power generation industry by allowing plant operators to monitor valve and vessel internals during operation. This will help reduce planned outages and plant component failures. During the course of this work, Structural Integrity Associates, Inc. gathered information from industry experts that target vibration amplitudes to be detected should be in the range of 0.001-in to 0.005-in (0.025-mm to 0.127-mm) and target vibration frequency ranges which should be detected were found to be between 0-Hz and 300-Hz. During the performed work, an ultrasonic measuring system was developed which utilized ultrasonic pulse-echo time-of-flight measurements to measure vibration frequency and amplitude. The developed system has been shown to be able to measure vibration amplitudes as low as 0.0008-in (0.020-mm) with vibration frequencies in the range of 17-Hz to 1000-Hz. Therefore, the developed system was able to meet the industry needs for vibration measurement. The developed ultrasonic system was also to be able to measure cavitation formation by monitoring the received ultrasonic time- and frequency-domain signals. This work also demonstrated the survivability of commercially available probes at temperatures up to 300-F for several weeks.

  4. Preventive and Predictive Maintenance, Warehousing of Spares, Periodic Testing and In-Service Inspection Activities at the Nigerian Research Reactor-1 Facility

    Energy Technology Data Exchange (ETDEWEB)

    Yusuf, I.; Mati, A. A.; Dewu, B. B.M., [Centre for Energy Research and Training, Ahmadu Bello University, Zaria (Nigeria)

    2014-08-15

    The Nigerian Research Reactor–1, or NIRR-1, is sited at Centre for Energy Research and Training, Ahmadu Bello University, Zaria, Nigeria. Activities on preventive or routine maintenance have been institutionalized since the commissioning of the reactor in February 2004. This has grossly reduced the rates of corrective maintenance activities and helped the reactor management a great deal in predicting failure rates of reactor components and other auxiliary units. Routine maintenance of systems and components are being carried out on a weekly, quarterly and annual basis based on manufacturer’s recommendations, which have been reviewed and improved over the years. The paper presents the implementation of maintenance activities in NIRR-1 from its initial criticality in 2004 till today and the new scheme for periodic testing and in-service-inspection developed after an IAEA Integrated Safety Assessment of Research Reactors mission. The measures put in place are envisaged to reduce the negative impact of ageing on NIRR-1 and its auxiliary systems. (author)

  5. Factors associated with regulatory action involving investigation of illnesses associated with Shiga toxin-producing Escherichia coli in products regulated by the Food Safety and Inspection Service.

    Science.gov (United States)

    Green, Alice L; Seys, Scott; Douris, Aphrodite; Levine, Jeoff; Robertson, Kis

    2014-07-01

    We described characteristics of the Escherichia coli O157 and Escherichia coli non-O157 illness investigations conducted by the United States Department of Agriculture's Food Safety and Inspection Service (FSIS) during the 5-year period from 2006 through 2010. We created a multivariable logistic regression model to determine characteristics of these investigations that were associated with FSIS regulatory action, which was defined as having occurred if a product recall occurred or if FSIS personnel performed an environmental health assessment (Food Safety Assessment) at the implicated establishment. During this period, FSIS took regulatory action in 38 of 88 (43%) investigations. Illness investigations in which FoodNet states were involved were more likely to result in regulatory action. Illness investigations in which state and local traceback, or FSIS traceback occurred were more likely to result in regulatory action. Reasons for lack of action included evidence of cross-contamination after the product left a regulated establishment, delayed notification, lack of epidemiological information, and insufficient product information.

  6. 9 CFR 381.309 - Finished product inspection.

    Science.gov (United States)

    2010-01-01

    ... Section 381.309 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE AGENCY ORGANIZATION AND TERMINOLOGY; MANDATORY MEAT AND POULTRY PRODUCTS INSPECTION AND VOLUNTARY INSPECTION AND CERTIFICATION POULTRY PRODUCTS INSPECTION REGULATIONS Canning and Canned Products § 381.309...

  7. 9 CFR 318.309 - Finished product inspection.

    Science.gov (United States)

    2010-01-01

    ... Section 318.309 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE AGENCY ORGANIZATION AND TERMINOLOGY; MANDATORY MEAT AND POULTRY PRODUCTS INSPECTION AND VOLUNTARY... Canning and Canned Products § 318.309 Finished product inspection. (a) Finished product inspections must...

  8. 9 CFR 355.21 - Products entering inspected plants.

    Science.gov (United States)

    2010-01-01

    ... INSPECTION AND CERTIFICATION CERTIFIED PRODUCTS FOR DOGS, CATS, AND OTHER CARNIVORA; INSPECTION... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Products entering inspected plants. 355.21 Section 355.21 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF...

  9. 9 CFR 355.3 - Plants eligible for inspection.

    Science.gov (United States)

    2010-01-01

    ... INSPECTION AND CERTIFICATION CERTIFIED PRODUCTS FOR DOGS, CATS, AND OTHER CARNIVORA; INSPECTION... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Plants eligible for inspection. 355.3 Section 355.3 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE...

  10. 9 CFR 355.7 - Inauguration of inspection.

    Science.gov (United States)

    2010-01-01

    ... INSPECTION AND CERTIFICATION CERTIFIED PRODUCTS FOR DOGS, CATS, AND OTHER CARNIVORA; INSPECTION... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Inauguration of inspection. 355.7 Section 355.7 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE...

  11. 49 CFR Appendix A to Part 230 - Inspection Requirements

    Science.gov (United States)

    2010-10-01

    ... valve. 2. Testing of water glasses and gauge cocks.* 3. Inspection of tubular water glass shields. 4... for indication of leaks. 7. Inspection for leaks obstructing vision of engine crew. 8. Observance of... Service Day Inspection Requirements; § 230.14 1. Washing of boiler. 2. Cleaning and inspection of water...

  12. 7 CFR 868.44 - New original inspection.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 7 2010-01-01 2010-01-01 false New original inspection. 868.44 Section 868.44... FOR CERTAIN AGRICULTURAL COMMODITIES Regulations Original Inspection Service § 868.44 New original... applicant may request a new original inspection on any previously inspected lot; except that a new original...

  13. Non-destructive inservice inspections

    International Nuclear Information System (INIS)

    Kauppinen, P.; Sarkimo, M.; Lahdenperae, K.

    1998-01-01

    In order to assess the possible damages occurring in the components and structures of operating nuclear power plants during service the main components and structures are periodically inspected by non-destructive testing techniques. The reliability of non-destructive testing techniques applied in these inservice inspections is of major importance because the decisions concerning the needs for repair of components are mainly based on the results of inspections. One of the targets of this research program has been to improve the reliability of non-destructive testing. This has been addressed in the sub-projects which are briefly summarised here. (author)

  14. The impact of holiday eating cues on self-regulatory bolstering for dieters and non-dieters.

    Science.gov (United States)

    Martins, Chrissy M; Vallen, Beth

    2014-01-01

    Two studies examined the hypothesis that the presence vs. absence of holiday food cues leads dieters to bolster self-regulatory resources and reduce consumption of a snack food. Study 1 evaluated snack-food consumption on a holiday vs. a non-holiday and in Study 2, the proposed underlying mechanism--the bolstering of self-regulatory resources when facing holiday-related cues--was explored. Study 1 followed a quasi-experimental design in which participants (N = 152) consumed candies either on a holiday or a non-holiday. Dieting behaviour was measured and the main outcome measure was consumption quantity. In Study 2, a true experiment, participants (N = 110) read primes associated with holiday eating, holiday history or a neutral topic. Self-regulatory bolstering was assessed as the main outcome measure. Study 1 showed that dieters consume more of a food item on an ordinary day relative to a holiday; the consumption patterns of non-dieters did not vary based on holiday cues. Study 2 demonstrated that dieters, but not non-dieters, bolster self-regulatory resources to a greater extent in the presence vs. absence of a holiday food cue. Dieters are better equipped to defend their diet-related goals when facing strong holiday-related temptations than weaker, everyday temptations.

  15. Determinants of change in bone mineral density and fracture risk during bisphosphonate holiday.

    Science.gov (United States)

    Xu, L H R; Adams-Huet, B; Poindexter, J R; Maalouf, N M

    2016-05-01

    In a retrospective analysis of 208 osteoporotic patients followed during a bisphosphonate holiday, lower body weight and risedronate use were associated with a more rapid decline in bone mineral density during the bisphosphonate holiday, while bone mineral density (BMD) trends were similar in patients who sustained vs. did not sustain a fracture. A drug holiday has been suggested for some bisphosphonate-treated patients with osteoporosis to minimize potential side effects from prolonged use. However, there is limited information on the evolution of BMD during a bisphosphonate holiday. Our study analyzed the longitudinal course of BMD following bisphosphonate discontinuation and assessed its determinants. Retrospective single-center cohort study of osteoporosis patients treated with alendronate or risedronate for at least 2 years and then discontinued their bisphosphonate for a drug holiday. Patients were stratified by bisphosphonate type and by fracture occurrence during drug holiday. A total of 208 patients were included in this analysis (87.5 % female). At the time of bisphosphonate cessation, mean ± SD age was 66.9 ± 8.9 years and BMI 24.5 ± 4.4 kg/m(2). Duration of bisphosphonate treatment was 5.2 ± 2.3 years, and follow-up during holiday was 3.3 ± 1.7 years. During the first 2 years of the holiday, BMD remained stable at the lumbar spine and femoral neck, but declined significantly at the total hip. BMD declined significantly at all sites thereafter. Significant predictors of BMD decline during bisphosphonate holiday included lower BMI at the start of the holiday and change in body weight during the holiday. BMD decline was more pronounced in former risedronate compared to former alendronate users. BMD trends were similar in patients who sustained vs. did not sustain a fracture during the holiday. BMD at the total hip declines significantly within 1 year of bisphosphonate discontinuation, particularly in lean patients

  16. Boiler inspection manipulator for Torness Power Station

    International Nuclear Information System (INIS)

    Carrey, R.T.A.; Yule, I.Y.; Sibson, S.; Playle, M.J.

    1996-01-01

    The Advanced Gas-cooled Reactors at Torness and Heysham 2 are provided with dedicated access for remote inspection equipment. These in-service inspection (ISI) accesses comprise 12 penetrations above the core for inspection of the above core area and boilers, 12 below core penetrations for inspection of the lower boiler area and access through any of the 8 gas circulator penetrations for inspection of the sub-diagrid area. This paper describes a manipulator which will access the reactor from above the core via any of the 8 peripheral penetrations. (UK)

  17. Weight and body composition change over a six-week holiday period.

    Science.gov (United States)

    Wagner, D R; Larson, J N; Wengreen, H

    2012-03-01

    Change in weight and body composition was assessed over a six-week holiday period. Baseline testing occurred the Monday or Tuesday prior to Thanksgiving Day (November 24 or 25, 2008), and the post-holiday assessment was the Monday or Tuesday after New Year's Day (January 5 or 6, 2009). Thirteen men and 21 women ranging in age from 23-61 years completed the study. The majority of participants (24 of 34) perceived that they had gained weight, and four did gain ≥2 kg. However, despite some changes to dietary and exercise habits, on average there was no difference between pre-holiday weight (74.0±17.8 kg) and post-holiday weight (73.9±18.1 kg), nor between pre-holiday body fat percentage (25.4±9.0%) and post-holiday body fat percentage (25.4±8.9%). Despite a perception of substantial weight gain, body weight and body fat remained unchanged over a six-week holiday period.

  18. Observation of a "holiday effect": a case of Chinese New Year in Taipei

    Science.gov (United States)

    Tan, P.-H.; Chou, C.; Chen, P.-Y.; Liang, J.-Y.

    2009-04-01

    Our study was an attempt to conduct a comprehensive and systematical examination of the holiday effect, defined as the difference in air pollutant concentrations between holiday and non-holiday periods. This holiday effect can be applied to other countries with similar national or cultural holidays. Hourly and daily surface measurements of six major air pollutants from thirteen air quality monitoring stations of the Taiwan Environmental Protection Administration during the Chinese New Year (CNY) and non-Chinese New Year (NCNY) periods were used. We documented evidence of a "holiday effect", where air pollutant concentrations were significantly different between holidays (CNY) and non-holidays (NCNY), in the Taipei metropolitan area over the past thirteen years (1994-2006). The concentrations of NOx, CO, NMHC, SO2 and PM10 were lower in the CNY than in the NCNY period, while the variation of O3 was reversed, which was mainly due to the NO titration effect. Similar differences in these six air pollutants between the CNY and NCNY periods were also found in the diurnal cycle and in the interannual variation. For the diurnal cycle, a common traffic-related double-peak variation was observed in the NCNY period, but not in the CNY period. Impacts of dust storms were also observed, especially on SO2 and PM10 in the CNY period. In the 13-year period of 1994-2006, decreasing trends of NOx and CO in the NCNY period implied a possible reduction of local emissions. Increasing trends of SO2 and PM10 in the CNY period, on the other hand, indicated a possible enhancement of long-range transport. These two mechanisms weakened the holiday effect.

  19. A 'beautiful death': mortality, death, and holidays in a Mexican municipality.

    Science.gov (United States)

    Wilches-Gutiérrez, José L; Arenas-Monreal, Luz; Paulo-Maya, Alfredo; Peláez-Ballestas, Ingris; Idrovo, Alvaro J

    2012-03-01

    Several studies have reported increased mortality during holidays. Using a cultural epidemiological, sequential mixed-methods approach, this study explored holiday-related trends using mortality data from Yautepec (Morelos, Mexico) collected between 1986 and 2008 (N=5027 deaths). This analysis found that mortality increased on Christmas Day and All Saints' Day. Mortality increased on Candlemas Day among women, and increased on New Year's Day among men. More deaths caused by cardiovascular disease among women and traumatic injuries among men occurred during holidays than in non-holiday periods. To ascertain the elements comprising the health/illness/death process in the context of a holiday in this municipality, we conducted semi-structured interviews in March and April 2009 with relatives of seven individuals who had died during holidays in the previous 4 years (N=11); data from these interviews were analyzed from a grounded theory perspective to ascertain common conceptual themes. The "beautiful death" emerged as the main concept in the interpretation of death; this concept was related to the expectation of a good death and the particularly special nature of death during a holiday because of the involvement of religious entities, such as God, the Virgin Mary, and/or a saint, at the moment of death. Quantitative and qualitative results provided information about the important effects of holidays, culture, and religious belief on mortality patterns within a Mexican context, and contributed to a better understanding of the relationships among mortality, the nature of death, and holidays. Our results suggest that, in the studied region, death can be interpreted as a "beautiful process". More research is needed to explore this process in other similar contexts and to address topics related to the care and attention given the dying person and the expectation of a good death. Copyright © 2012 Elsevier Ltd. All rights reserved.

  20. Detailed simulation of ultrasonic inspections

    International Nuclear Information System (INIS)

    Chaplin, K.R.; Douglas, S.R.; Dunford, D.

    1997-01-01

    Simulation of ultrasonic inspection of engineering components have been performed at the Chalk River Laboratories of AECL for over 10 years. The computer model, called EWE for Elastic Wave Equations, solves the Elastic Wave Equations using a novel finite difference scheme. It simulates the propagation of an ultrasonic wave from the transducer to a flaw, the scatter of waves from the flaw, and measurement of signals at a receive transducer. Regions of different materials, water and steel for example, can be simulated. In addition, regions with slightly different material properties from the parent material can be investigated. The two major types of output are displays of the ultrasonic waves inside the component and the corresponding A-scans. EPRI and other organizations have used ultrasonic models for: defining acceptable ultrasonic inspection procedures, designing and evaluating inspection techniques, and for quantifying inspection reliability. The EWE model has been applied to the inspection of large pipes in a nuclear plant, gas pipeline welds and steam generator tubes. Most recent work has dealt with the ultrasonic inspection of pressure tubes in CANDU reactors. Pressure tube inspections can reliably detect and size defects; however, there are improvements that can be made. For example, knowing the sharpness of a flaw-tip is crucial for fitness for service assessments. Computer modelling of the ultrasonic inspection of flaws with different root radius has suggested inspection techniques that provide flaw tip radius information. A preliminary investigation of these methods has been made in the laboratory. The basis for the model will be reviewed at the presentation. Then the results of computer simulations will be displayed on a PC using an interactive program that analyzes simulated A-scans. This software tool gives inspection staff direct access to the results of computer simulations. (author)

  1. AECL experience in fuel channel inspection

    Energy Technology Data Exchange (ETDEWEB)

    Van Drunen, G. [Atomic Energy of Canada Limited, Chalk River, Ontario (Canada); Gunn, R. [Atomic Energy of Canada Limited, Mississauga, Ontario (Canada); Mayo, W.R. [Atomic Energy of Canada Limited, Chalk River, Ontario (Canada); Scott, D.A. [Atomic Energy of Canada Limited, Mississauga, Ontario (Canada)

    1999-06-01

    Inspection of CANDU fuel channels (FC) is performed to ensure safe and economic reactor operation. CANDU reactor FCs have features that make them a unique non-destructive testing (NDT) challenge. The thin, 4 mm pressure-tube wall means flaws down to about 0.1 mm deep must be reliably detected and characterized. This is one to two orders of magnitude smaller than is usually considered of significant concern for steel piping and pressure vessels. A second unique feature is that inspection sensors must operate in the reactor core--often within 20 cm of highly radioactive fuel. Work on inspection of CANDU reactor FCs at AECL dates back over three decades. In that time, AECL staff have provided equipment and conducted or supervised in-service inspections in about 250 FCs, in addition to over 8000 pre-service FCs. These inspections took place at every existing CANDU reactor except those in India and Romania. Early FC inspections focussed on measurement of changes in dimensions (gauging) resulting from exposure to a combination of neutrons, stress and elevated temperature. Expansion of inspection activities to include volumetric inspection (for flaws) started in the mid-1970s with the discovery of delayed hydride cracking in Pickering 3 and 4 rolled joints. Recognition of other types of flaw mechanisms in the 1980s led to further expansion in both pre-service and in-service inspections. These growing requirements, to meet regulatory as well as economic needs, led to the development of a wide spectrum of inspection technology that now includes tests for hydrogen concentration, structural integrity of core components, flaws, and dimensional change. This paper reviews current CANDU reactor FC inspection requirements. The equipment and techniques developed to satisfy these requirements are also described. The paper concludes with a discussion of work in progress in AECL aimed at providing state-of-the-art FC inspection services. (author)

  2. 7 CFR 33.11 - Inspection and certification.

    Science.gov (United States)

    2010-01-01

    ... Agriculture Regulations of the Department of Agriculture AGRICULTURAL MARKETING SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE COMMODITY STANDARDS AND STANDARD CONTAINER REGULATIONS REGULATIONS ISSUED UNDER AUTHORITY OF THE EXPORT APPLE ACT Regulations § 33.11 Inspection and...

  3. 7 CFR 51.39 - Fees for appeal inspections.

    Science.gov (United States)

    2010-01-01

    ... Agriculture Regulations of the Department of Agriculture AGRICULTURAL MARKETING SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE REGULATIONS AND STANDARDS UNDER THE AGRICULTURAL MARKETING ACT OF 1946 FRESH FRUITS, VEGETABLES AND OTHER PRODUCTS 1,2 (INSPECTION, CERTIFICATION, AND...

  4. Instructional Design of Oral English Holidays at Primary School Based on“Task-Based”Approach

    Institute of Scientific and Technical Information of China (English)

    时玉华

    2014-01-01

    <正>1.Lead-in with a song about holidays After the bell rang,a greeting was first made between the author and the students.Then the author had a free talk with students,she drew the students’attention to the topic related to holiday by asking students"What date is it today?"All the students can answer the author"Today is the 15th of

  5. Temporal settling of holidays and annual customs in villages at the foot of the Avala mountain

    Directory of Open Access Journals (Sweden)

    Ivanović-Barišić Milina M.

    2004-01-01

    Full Text Available The life of rural population in villages at the foot of the Avala Mountain was marked by a constant shift of working days - when the local population had to ensure its existence - and idle days. Various holiday occasions altered the regularities of everyday life. During a holiday celebration the whole village community, as well as individuals, had to adopt a new way of behavior - i.e., to discontinue all work obligations that filled regular working days. In the past, these idle days were equally important for families and their members, and for the rural community in general. On the whole, the holidays appear in an annual cycle, discernible in a parallel mode: 1, Weekly and 2, Annual celebrations. The Weekly cycle is celebrated on Sundays, while the annual cycle celebrated various family' holidays or just days marked as "holidays". During the celebration of holidays participants departed from their everyday existing conditions and attuned to the Holy time, generated during holidays. Various rituals and customs used to be performed that not only added to the holiday ambiance, but also ensured the well-being of the family and rural community, and protected in this way, against misfortune. This period was marked by profound changes in family and community organizations. The changes in rural areas are the result of the rural population mass relocation in search for work and the beginning of urbanization. The process of industrialization along with the influx of the authorities onto traditional folk culture have left permanent consequences in the rural community settings and inherited folk culture.

  6. Fourth Annual Holiday Decorating Contest Features Sharks, Santas, Toys, and More | Poster

    Science.gov (United States)

    The 2017 holiday season brought cold temperatures and heated competition to NCI at Frederick as 14 groups faced off in the R&W Club of Frederick’s Fourth Annual Holiday Decorating Contest. Keeping with tradition, many of the competitors sought to outdo not just each other’s themed entries, but also their own decorations from previous years. Accordingly, this year’s themes ranged from childhood memories to local landscapes to the downright outlandish.

  7. 75 FR 38765 - Domestic Origin Verification System Questionnaire and Regulations Governing Inspection and...

    Science.gov (United States)

    2010-07-06

    ..., facility assessment services, certifications of quantity and quality, import product inspections, and... control number. These include export certification, inspection of section 8e import products, and...] Domestic Origin Verification System Questionnaire and Regulations Governing Inspection and Certification of...

  8. Visual inspection. Better than your eyes

    International Nuclear Information System (INIS)

    Jakobs, N.; Baumgartl, R.

    2005-01-01

    Ongoing improvements in the development of camera technologies and manipulator techniques permit an enhanced performance of inspection tasks in nuclear services. In areas of reduced dose rate it's possible to use small size high resolution CCD cameras instead of tube cameras. Underwater inspections may be performed by submarine instead of rigid manipulator systems. This allows the enlargement of inspection areas and the performance at reduced time and personnel dose rate. (author)

  9. Holiday Destination Choice Behavior Analysis Based on AFC Data of Urban Rail Transit

    Directory of Open Access Journals (Sweden)

    Chang-jun Cai

    2015-01-01

    Full Text Available For urban rail transit, the spatial distribution of passenger flow in holiday usually differs from weekdays. Holiday destination choice behavior analysis is the key to analyze passengers’ destination choice preference and then obtain the OD (origin-destination distribution of passenger flow. This paper aims to propose a holiday destination choice model based on AFC (automatic fare collection data of urban rail transit system, which is highly expected to provide theoretic support to holiday travel demand analysis for urban rail transit. First, based on Guangzhou Metro AFC data collected on New Year’s day, the characteristics of holiday destination choice behavior for urban rail transit passengers is analyzed. Second, holiday destination choice models based on MNL (Multinomial Logit structure are established for each New Year’s days respectively, which takes into account some novel explanatory variables (such as attractiveness of destination. Then, the proposed models are calibrated with AFC data from Guangzhou Metro using WESML (weighted exogenous sample maximum likelihood estimation and compared with the base models in which attractiveness of destination is not considered. The results show that the ρ2 values are improved by 0.060, 0.045, and 0.040 for January 1, January 2, and January 3, respectively, with the consideration of destination attractiveness.

  10. Electricity consumption in holiday cottages. Projections and scenarios; Elforbrug i sommerhuse. Fremskrivning og scenarier

    Energy Technology Data Exchange (ETDEWEB)

    Andersen, Frits M.; Christensen, Morten; Jensen, Ole Michael; Kofoed, N.U.; Morthorst, P.E.

    2006-07-01

    Relative to the amount of electricity consumed by households, the consumption in holiday cottages is minor. In Denmark however, the past development in electricity consumption in holiday cottages differs significantly from the general trend in household electricity consumption. While the electricity consumption per household has been almost constant since the 1990s, the consumption per holiday cottage has increased 40 %. In addition, many new holiday cottages have been built and since 1990 the total electricity consumption has increased by 55 %. To find the reason for the increasing electricity consumption and to estimate the future demand of electricity for holiday cottages, a multidisciplinary study combining top-down and bottom-up estimations was carried out. In the top-town estimation, econometrics on aggregated data and general past trends analyses were combined. Dealing with statistics of time-series for the total electricity consumption in a number of holiday cottages, it was possible to interpret the past trends and to extrapolate the actual consumption for the year 2005 to the annual consumption in 2015. (BA)

  11. Exploring Intracity Taxi Mobility during the Holidays for Location-Based Marketing

    Directory of Open Access Journals (Sweden)

    Wen-jun Wang

    2017-01-01

    Full Text Available Taxi mobility information can be considered as an important source of mobile location-based information for making marketing decisions. So, studying the behavioral patterns of taxis in a Chinese city during the holidays using the global positioning system (GPS can yield remarkable insights into people’s holiday travel patterns, as well as the odd-even day vehicle prohibition system. This paper studies the behavioral patterns of taxis during specific holidays in terms of pick-up and drop-off locations, travel distance, mobile step length, travel direction, and radius of gyration on the basis of GPS data. Our results support the idea of a polycentric city. It is concluded from the reporting results that there are no significant changes in the distribution of pick-up and drop-off locations, travel distance, or travel direction during holidays in comparison to work days. The results suggest that human travel by taxi has a stable regularity. However, the radius of gyration of movement by most of the taxis becomes significantly larger during holidays that indicate more long-distance travels. The current study will be helpful for location-based marketing during the holidays.

  12. Inspection Citations

    Data.gov (United States)

    U.S. Department of Health & Human Services — Disclosure of reporting citations provide the public with a rationale for the Agency’s enforcement actions and will also help to inform public and industry...

  13. 9 CFR 590.920 - Importer to make application for inspection of imported eggs and egg products.

    Science.gov (United States)

    2010-01-01

    ... inspection of imported eggs and egg products. 590.920 Section 590.920 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE EGG PRODUCTS INSPECTION INSPECTION OF EGGS AND EGG PRODUCTS (EGG PRODUCTS INSPECTION ACT) Imports § 590.920 Importer to make application for inspection of...

  14. Evaluation of radiological safety in industrial gammagraphy services during the construction of Bolivia-Brazil gas transmission lines (GASBOL), by regulatory inspections from brazilian CNEN

    International Nuclear Information System (INIS)

    Aquino, Josilto O. de; Silva, Francisco Cesar A. da; Leocadio, Joao Carlos; Pinho, Adaugoberto S. de; Souza, Luiz Antonio C. de; Lourenco, Manoel J.; Nicola, Marcello S.; Melo, Ivan F.

    2001-01-01

    This paper presents a brief description of the Brazilian Regulatory Authority's (National Commission of Nuclear Energy - CNEN) action about safety control on industrial radioactive installations. It shows some specific radiation safety inspections that were done during the construction of the Bolivia-Brazil Gas Transmission Line (GASBOL). In this GASBOL work, it was used industrial radiography sources for weld quality control. During two years were done thirty regulatory safety inspections in these movable installations that use gamma radiography devices. As final result, it was noticed that the national system of inspection to control the safe use of radioactive sources in industrial activities is really efficient because none overexposure was detect and every CNEN's recommendations were applied by the operators. Some result about the gamma devices and violations are also showed. (author)

  15. Ultrasonic inspection of inpile tubes

    International Nuclear Information System (INIS)

    Boyd, D.M.; Bossi, H.

    1985-01-01

    The in-service inspection (ISI) of inpile tubes can be performed accurately and safely with a semiautomatic ultrasonic inspection system. The ultrasonic technique uses a set of multiple transducers to detect and size cracks, voids, and laminations radially and circumferentially. Welds are also inspected for defects. The system is designed to inspect stainless steel and Inconel tubes ranging from 53.8 mm (2.12 in.) to 101.6 mm (4 in.) inner diameter with wall thickness on the order of 5 mm. The inspection head contains seven transducers mounted in a surface-following device. Six angle-beam transducers generate shear waves in the tubes. Two of the six are oriented to detect circumferential cracks, and two detect axial cracks. Although each of these four transducers is used in the pulse-echo mode, they are oriented in aligned sets so pitch-catch operation is possible if desired. The remaining angle-beam transducers are angulated to detect flaws that are off axial or circumferential orientation. The seventh transducer is used for longitudinal inspection and detects and sizes laminar-type defects

  16. Observation of a "holiday effect ": a case of Chinese New Year in Taiwan

    Science.gov (United States)

    Tan, Pei-Hua; Chou, Chia; Chen, Pen-Yuan; Sun, Chen-Yi; Wu, Bo-Lin

    2010-05-01

    Our study was an attempt to conduct a comprehensive and systematical examination of the 'holiday effect', defined as the difference in air pollutant concentrations between holiday and non-holiday periods. This holiday effect can be applied to other countries with similar national or cultural holidays. Hourly and daily surface measurements of six major air pollutants from fifty-four air quality monitoring stations of the Environmental Protection Administration in Taiwan during the Chinese New Year (CNY) and non-Chinese New Year (NCNY) periods of 1994-2008 were used. The air pollutant concentrations were significantly different between holidays (CNY) and non-holidays (NCNY), in almost all the Taiwan area, except CO in the eastern part which is a relatively less-developed area. The industrial development of Taiwan extends from the north to the south; and then from the west to the east, due to the inconvenient transportation in the east. The difference percentage, defined as the concentration difference of CNY minus NCNY relative to the NCNY concentration, is highly related to the degree of industrialization. The difference percentages of NOx, CO, NMHC, O3, SO2, and PM10 are more in the west than in the east. Over the western part of Taiwan, the difference percentages of NOx, CO, NMHC and O3 are more in the north than in the south; that of SO2basically follows a similar trend but is more in the middle Taiwan, which might be related to emission change of a major coal-fired power plant. The difference percentage of PM10 over the western Taiwan is more in the south than in the north, probably due to stronger dust storm impacts on the northern Taiwan, where the dust storm sometimes occurs to 'pollute' the clean air during the CNY period, and then causes fewer difference percentage.

  17. Preliminary study of micro nutrient intake comparison of elementary school children on holiday and schooldays

    International Nuclear Information System (INIS)

    Widya Dwi Ariyani; K Oginawati; Muhayatun; Endah Damastuti; Syukria Kurniawati

    2010-01-01

    The dietary pattern has influences on nutritional status. In this activity, we compared micro nutrient intake of elementary school children (7-12 years) as a consequence of dietary pattern difference on holiday and schooldays, due to most of their time was spend in school where the tendency of snack consuming is usually higher at school. Therefore, the comparison of dietary pattern and micro nutrient daily intake of elementary school children on holiday and schooldays was needed to carry out. Food sampling was done by duplicate diet method for 3 days in a row with one day among them was a holiday. The determination of micro nutrient elements concentration was measured using instrumental neutron activation analysis (INAA) and atomic absorption spectrometry (AAS). There was a significant difference of daily intake of Na, K, Ca, Fe, and Cr on holiday and schooldays, while for Br, Mg, Zn, Mn, Cu, Se and Co were no significant difference. The most significant difference contained on sodium intake with average daily intake was 2578 mg/day on schooldays and 1298 mg/day on holiday. It was caused by the number of high sodium content snacks consumed on schooldays were bigger than on holiday. However, the results of micro nutrient daily intake obtained either on schooldays or on holiday generally were below RDA (Recommended Dietary Allowance), except for Na and Cr. It's expected that this result could be used as information about nutrition status of children as next generation on behalf of supporting the formation of high quality human resources. (author)

  18. The effect of weekend and holiday sleep compensation on childhood overweight and obesity.

    Science.gov (United States)

    Wing, Yun Kwok; Li, Shirley Xin; Li, Albert Martin; Zhang, Jihui; Kong, Alice Pik Shan

    2009-11-01

    A growing trend in childhood sleep habits is to compensate for the weekday sleep deficit by longer weekend and holiday sleep duration. We aimed to investigate the effect of weekend/holiday sleep compensation in relation to childhood overweight and obesity. This is a community-based cross-sectional study with 5159 children (49.6% boys), mean age of 9.25 years (SD: 1.78), from 13 primary schools in Hong Kong. Data on sleep patterns, lifestyle, body weight, and height of children were obtained from questionnaires. Sleep durations during weekdays, weekends, and holidays were predictor variables. BMI z scores and obesity/overweight status were the outcome measures. Children slept significantly longer during holidays (mean [SD]: 10.20 (0.92) hours) and weekends (school terms) (10.07 [0.93] hours) than during school weekdays (9.18 [0.95] hours). Children with shorter sleep duration had higher BMI z scores regardless of the sleep parameters used in the analysis. Among children who slept holidays had significantly increased risk of overweight/obesity compared with those children with sleep compensation (odds ratios: 2.59 [95% confidence interval: 1.22-5.48] and 2.32 [95% confidence interval: 1.00-5.53], respectively). There was a prominent difference in sleep duration between weekdays and weekends/holidays among school children. Short sleep duration was associated with higher BMI, but compensation of sleep during weekends/holidays may partly ameliorate the risk of childhood overweight/obesity. Further prospective and interventional study is needed to delineate the risk-benefit effect of these increasingly common sleep habits among children and adolescents.

  19. Emergency medical admissions, deaths at weekends and the public holiday effect. Cohort study.

    Science.gov (United States)

    Smith, Stacy; Allan, Ananda; Greenlaw, Nicola; Finlay, Sian; Isles, Chris

    2014-01-01

    To assess whether mortality of patients admitted on weekends and public holidays was higher in a district general hospital whose consultants are present more than 6 h per day on the acute medical unit with no other fixed clinical commitments. Cohort study. Secondary care. All emergency medical admissions to Dumfries and Galloway Royal Infirmary between 1 January 2008 and 31 December 2010. We examined 7 and 30 day mortality for all weekend and for all public holiday admissions, using all weekday and non-public holiday admissions, respectively, as comparators. We adjusted mortality for age, gender, comorbidity, deprivation, diagnosis and year of admission. 771 (3.8%) of 20 072 emergency admissions died within 7 days of admission and 1780 (8.9%) within 30 days. Adjusted weekend mortality in the all weekend versus all other days analysis was not significantly higher at 7 days (OR 1.10, 95% CI 0.92 to 1.31; p=0.312) or at 30 days (OR 1.07, 95% CI 0.94 to 1.21; p=0.322). By contrast, adjusted public holiday mortality in the all public holidays versus all other days analysis was 48% higher at 7 days (OR 1.48, 95% CI 1.12 to 1.95; p=0.006) and 27% higher at 30 days (OR 1.27, 95% CI 1.02 to 1.57; p=0.031). Interactions between the weekend variable and the public holiday variable were not statistically significant for mortality at either 7 or 30 days. Patients admitted as emergencies to medicine on public holidays had significantly higher mortality at 7 and 30 days compared with patients admitted on other days of the week.

  20. Bisphosphonate Treatment in Osteoporosis: Optimal Duration of Therapy and the Incorporation of a Drug Holiday.

    Science.gov (United States)

    Villa, Jordan C; Gianakos, Arianna; Lane, Joseph M

    2016-02-01

    Bisphosphonates are the most widely used treatment for osteoporosis. They accumulate in the bone for years, and therefore, their inhibitory effects on osteoclasts may persist after drug discontinuation. The ideal duration of therapy remains controversial. The purpose of this study is to review the literature to determine the (1) indications for drug holiday, (2) the duration of drug holiday, (3) the evaluation during drug holiday, and (4) the proper treatment and maintenance after drug holiday. A review of two electronic databases (PubMed/MEDLINE and EMBASE) was conducted using the term "(Drug holiday)," in January 29, 2015. Inclusion criteria were as follows: (1) clinical trials and case control, (2) human studies, (3) published in a peer-review journal, and (4) written in English. Exclusion criteria were as follows: (1) case reports, (2) case series, and (3) in vitro studies. The literature supports a therapeutic pause after 3-5 years of bisphosphonate treatment in patients with minor bone deficiencies and no recent fragility fracture (low risk) and in patients with moderate bone deficiencies and/or recent fragility fracture (moderate risk). In these patients, a bone health reevaluation is recommended every 1-3 years. Patients with high fracture risk should be maintained on bisphosphonate therapy without drug holiday. The duration and length of drug holiday should be individualized for each patient. Evaluation should be based on serial bone mass measurements, bone turnover rates, and fracture history evaluation. If after drug therapy, assessments show an increased risk of fracture, the patient may benefit from initiating another treatment. Raloxifene, teriparatide, or denosumab are available options.

  1. Notification: Background Investigation Services New Assignment Notification: EPA’s Efforts to Incorporate Environmental Justice Into Clean Air Act Inspections for Air Toxics

    Science.gov (United States)

    The purpose of this memorandum is to notify you that the EPA OIG plans to begin the preliminary research phase of an evaluation of the U.S. EPA's efforts to incorporate environmental justice into Clean Air Act inspections for air toxics.

  2. Study on in-service inspection and repair program and related plant design for Japan Sodium-Cooled Fast Reactor (JSFR)

    International Nuclear Information System (INIS)

    Kubo, Shigenobu; Suzuki, Shinichi; Kotake, Shoji; Nishiyama, Noboru; Uzawa, Masayuki

    2011-01-01

    Maintenance and repair program and conformity with them were investigated as a part of the conceptual design study of Japan Sodium-cooled Fast Reactor (JSFR). The maintenance program was set by taking the feature of sodium-cooled reactors and domestic practice of LWRs into account. Both of regulatory required inspection and voluntary inspection, which are conducted in the domestic LWRs, were counted. The regulatory required ISI program was based on that of the previous Japanese SFRs, LWRs (JSME S NA1) and liquid metal cooled reactors (ASME section XI division 3). Parts to be inspected, methods of inspection were identified for major structures and components. Concerning the repair program, we set three levels of repair requirements based on estimated frequency of defect and failure during the plant life time. For level 1, which might be occur several times during the plant life time, it is required to be easily repaired in a short period. Access routes and working space are considered in the component design and its arrangement. For level 2, which might be unlikely to occur during the plant life time, it is required to check that the repair work is feasible in a practical time range. For level 3, which frequency is negligible small, repair is not taken into account but the feasibility was investigated. The plant design shall be done so that all of above mentioned inspection and repair can be conducted. It is desired to ensure accessibility for all of the coolant and cover gas boundaries and the internal structures in order to cope with unforeseen troubles. Access routes for the reactor vessel and its internal structures, piping, pumps and intermediate heat exchangers and steam generators were investigated. As the results of that, possible ways for implementation of the maintenance and repair were identified. (author)

  3. 77 FR 34872 - Airworthiness Directives; Fokker Services B.V. Airplanes

    Science.gov (United States)

    2012-06-12

    ....m. and 5 p.m., Monday through Friday, except Federal holidays. For service information identified in... holidays. The AD docket contains this proposed AD, the regulatory evaluation, any comments received, and...) 11340 through 11343 inclusive, 11347, 11348, 11350 through 11356 inclusive, 11359, 11360, 11361, 11367...

  4. Rail inspection of RCF defects

    Directory of Open Access Journals (Sweden)

    Z. Popović

    2013-10-01

    Full Text Available Rail defects due to rolling contact fatigue (RCF threaten the traffic safety around the world. That hazard is more distinct on railways without adequate maintenance strategy. Realization of interoperability of European railway network demands from every infrastructure manager to have a maintenance plan for the infrastructure subsystem. Besides that, this plan includes rail inspection and strategy against RCF defects. This paper emphasizes the importance of rail inspection and early detection of RCF because the most of RCF crack should be removed in rail grinding campaigns (preventive, cyclical and corrective activities during the whole rail service life.

  5. Position Statement: Drug Holiday in Osteoporosis Treatment with Bisphosphonates in South Korea

    Science.gov (United States)

    Lee, Seung Hun; Gong, Hyun Sik; Kim, Tae-Hee; Park, Si Young; Shin, Jung-Ho; Cho, Sun Wook

    2015-01-01

    Bisphosphonates have been widely used in the treatment of osteoporosis with robust data from many placebo-controlled trials demonstrating its efficacy in fracture risk reduction over 3 to 5 years of treatment. Although bisphosphonates are generally safe and well tolerated, concerns have emerged about the adverse effects related to its long-term use, including osteonecrosis of the jaw and atypical femur fractures. Because bisphosphonates are incorporated into the skeleton and continue to exert an anti-resorptive effect for a period of time after the discontinuation of drugs, the concept of a "drug holiday" has emerged, whereby the risk of adverse effects might be decreased while the patient still benefits from anti-fracture efficacy. As randomized clinical trial evidence is not yet available on who may qualify for a drug holiday, there is considerable controversy regarding the selection of candidates for the drug holiday and monitoring during a drug holiday, both of which should be based on individual assessments of risk and benefit. This statement will provide suggestions for clinicians in South Korea on the identification of possible candidates and monitoring during a bisphosphonate drug holiday. PMID:26713307

  6. Additive Manufacturing Infrared Inspection

    Science.gov (United States)

    Gaddy, Darrell; Nettles, Mindy

    2015-01-01

    The Additive Manufacturing Infrared Inspection Task started the development of a real-time dimensional inspection technique and digital quality record for the additive manufacturing process using infrared camera imaging and processing techniques. This project will benefit additive manufacturing by providing real-time inspection of internal geometry that is not currently possible and reduce the time and cost of additive manufactured parts with automated real-time dimensional inspections which deletes post-production inspections.

  7. 9 CFR 2.128 - Inspection for missing animals.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Inspection for missing animals. 2.128 Section 2.128 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE ANIMAL WELFARE REGULATIONS Miscellaneous § 2.128 Inspection for missing animals. Each dealer...

  8. 47 CFR 80.953 - Inspection and certification.

    Science.gov (United States)

    2010-10-01

    ... date on which it is placed in service. (b) An inspection and certification of a ship subject to the... must be recorded in the ship's radiotelephone log and include: (1) The date the inspection was... part and has successfully passed the inspection. (c) The vessel owner, operator, or ship's master must...

  9. 47 CFR 80.59 - Compulsory ship inspections.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Compulsory ship inspections. 80.59 Section 80... STATIONS IN THE MARITIME SERVICES Applications and Licenses § 80.59 Compulsory ship inspections. (a) Inspection of ships subject to the Communications Act or the Safety Convention. (1) The FCC will not normally...

  10. 9 CFR 381.35 - Appeal inspections; how made.

    Science.gov (United States)

    2010-01-01

    ... the employee of the Department making the appeal determination. The cost of any such appeal shall be... Employees; Appeals § 381.35 Appeal inspections; how made. Any person receiving inspection service may, if dissatisfied with any decision of an inspector relating to any inspection, file an appeal from such decision...

  11. 9 CFR 381.14 - Inspection concerning purportedly exempted operations.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Inspection concerning purportedly exempted operations. 381.14 Section 381.14 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE... make inspections in accordance with law to ascertain whether any of the provisions of the Act or the...

  12. Ultrasonic inspection development at HEDL

    International Nuclear Information System (INIS)

    Day, C.K.; Mech, S.J.; Michaels, T.E.; Dixon, N.E.

    1978-01-01

    Ultrasonic testing methods and equipment are being developed to support preservice and in-service inspection of selected FFTF welds. A digital computer system is employed in the analysis of both simulated FFTF pipe sections and plate specimens containing fatigue cracks. It is anticipated that test evaluation standards containing fatigue cracks will partially eliminate questions formerly associated with weld test calibration producers by providing natural cracks which follow grain boundaries and stress patterns resembling piping situ conditions. Studies have revealed that commercial transducers may satisfy LMFBR ultrasonic pipe inspection applications: The test system evaluation included transducers and wedge coupling and fluid coupling materials which exhibited acceptable performance at temperatures to 2300C. Results are presented that demonstrate the feasibility of ultrasonic inspection of components immersed in sodium at temperatures to 2600C. (UK)

  13. Validation results of the pre-service ultrasonic inspections of the Sizewell B pressurizer and steam generators and reactor coolant pump flywheels

    International Nuclear Information System (INIS)

    Conroy, P.J.; Leyland, K.S.

    1995-01-01

    In the UK, concern over the safety issues associated with nuclear power generation resulted in a demand for a public inquiry into the construction and operation of Sizewell ''B'', Britain's first PWR. This public inquiry was additional to the UK's normal licensing process. The onus was placed upon the UK utility, CEGB (now Nuclear Electric plc) to provide evidence to the inquiry to support the case that the plant would be constructed and operated to a sufficiently high standard of safety. Part of the evidence to the inquiry (1) relied upon the ability of ultrasonic inspections to verify that the reactor pressure vessel and other safety critical components (collectively known as IoF components), were free from defects that could threaten structural integrity. At that time, the body of evidence showed that although ultrasonic inspection had the potential to satisfy this requirement, it would be necessary to validate the procedures and key operators used in order to provide assurance that they were adequate. Inspection validation therefore became an integral part of the UK PWR nuclear power program

  14. Official holidays in 2015 and end-of-year closure 2015/2016

    CERN Multimedia

    2014-01-01

    Official holidays in 2015 and end-of-year closure 2015/2016 (Application of Articles R II 4.38 and R II 4.39 of the Staff Regulations).   Official holidays in 2015 (in addition to the special leave during the annual closure): Thursday, 1 January (New Year) Friday, 3 April (Good Friday) Monday, 6 April (Easter Monday) Friday, 1 May Thursday, 14 May (Ascension day) Monday, 25 May (Whit Monday) Thursday, 10 September ("Jeûne genevois") Thursday, 24 December (Christmas Eve) Friday, 25 December (Christmas) Thursday, 31 December (New Year’s Eve) Annual closure of the site of the Organization during the Christmas holidays and special leave granted by the Director-General: The Laboratory will be closed from Saturday, 19 December 2015 to Sunday, 3 January 2016 inclusive (without deduction of annual leave). The first working day in the New Year will be Monday, 4 January 2016. Human Resources Department Tel. 73903/79257

  15. Official holidays in 2005 and end-of-year closure 2005/2006

    CERN Document Server

    Human Resources Department

    2005-01-01

    (Application of Articles R II 4.33 and R II 4.34 of the Staff Regulations) Official holidays in 2005 (in addition to the end-of-year holidays) : Friday 25 March (Good Friday) Monday 28 March (Easter Monday) Thursday 5 May (Ascension Day) Friday 6 May Compensation granted for 1st May (Article R II 4.33 of the Staff Regulations) Monday 16 May (Whit Monday) Thursday 8 September ("Jeûne genevois") Annual closure of the site of the Organization during the Christmas holidays and day of special leave granted by the Director-General : The Laboratory will be closed from Thursday 22 December 2005 to Wednesday 4 January 2006 inclusive (without deduction of annual leave). The first working day in the New Year will be Thursday 5 January 2006. Human Resources Department Tel. 74128

  16. Official holidays in 2007 and end-of-year closure 2007/2008

    CERN Document Server

    HR Department

    2007-01-01

    (Application of Articles R II 4.38 and R II 4.39 of the Staff Regulations) Official holidays in 2007 (in addition to the end-of-year holidays): Friday, 6th April (Good Friday) Monday, 9th April (Easter Monday) Tuesday, 1st May (1st May) Thursday, 17th May (Ascension Day) Monday, 28th May (Whit Monday) Thursday, 6th September ('Jeûne genevois') Annual closure of the site of the Organization during the Christmas holidays and days of special leave granted by the Director-General: The Laboratory will be closed from Saturday, 22nd December 2007 to Sunday, 6th January 2008 inclusive (without deduction of annual leave). The first working day in the New Year will be Monday, 7th January 2008. Human Resources Department Tel. 74128

  17. Official holidays in 2006 and end-of-year closure 2006/2007

    CERN Multimedia

    2006-01-01

    (Application of Articles R II 4.33 and R II 4.34 of the Staff Regulations) Official holidays in 2006 (in addition to the end-of-year holidays) : Friday, 14th April (Good Friday) Monday, 17th April (Easter Monday) Monday,1st May Thursday, 25th May (Ascension Day) Monday, 5th June (Whit Monday) Thursday, 7th September ('Jeûne genevois') Annual closure of the site of the Organization during the Christmas holidays and day of special leave granted by the Director-General : The Laboratory will be closed from Saturday, 23rd December 2006 to Sunday, 7th January 2007 inclusive (without deduction of annual leave). The first working day in the New Year will be Monday, 8th January 2007. Human Resources Department Tel. 74128

  18. Official holidays in 2007 and end-of-year closure 2007/2008

    CERN Multimedia

    HR Department

    2007-01-01

    (Application of Articles R II 4.38 and R II 4.39 of the Staff Regulations) Official holidays in 2007 (in addition to the end-of-year holidays) : - Friday, 6th April (Good Friday) - Monday, 9th April (Easter Monday) - Tuesday, 1st May (1st May) - Thursday, 17th May (Ascension Day) - Monday, 28th May (Whit Monday) - Thursday, 6th September ("Jeûne genevois") Annual closure of the site of the Organization during the Christmas holidays and days of special leave granted by the Director-General : The Laboratory will be closed from Saturday, 22nd December 2007 to Sunday, 6th January 2008 inclusive (without deduction of annual leave). The first working day in the New Year will be Monday, 7th January 2008. Human Resources Department Tel. 74128

  19. Official holidays in 2009 and end-of-year closure 2009/2010

    CERN Multimedia

    HR Department

    2009-01-01

    (Application of Articles R II 4.38 and R II 4.39 of the Staff Regulations) Official holidays in 2009 (in addition to the end-of-year holidays): Friday 10 April (Good Friday) Monday 13 April (Easter Monday) Friday 1 May Thursday 21 May (Ascension day) Monday 1 June (Whit Monday) Thursday 10 September ("Jeûne genevois") Annual closure of the site of the Organization during the Christmas holidays and day of special leave granted by the Director-General: The Laboratory will be closed from Saturday 19 December 2009 to Sunday 3 January 2010 inclusive (without deduction of annual leave). The first working day in the New Year will be Monday 4 January 2010. Human Resources Department Tel. 73903

  20. Official holidays in 2008 and end-of-year closure 2008/2009

    CERN Multimedia

    HR Department

    2007-01-01

    (Application of Articles R II 4.38 and R II 4.39 of the Staff Regulations) Official holidays in 2008 (in addition to the end-of-year holidays) : Friday 21st March (Good Friday); Monday, 24th March (Easter Monday); Thursday,1st May (Ascension day); Friday 2nd May (Compensation of 1st May); Monday, 12th May (Whit Monday); Thursday, 11th September ("Jeûne genevois"). Annual closure of the site of the Organization during the Christmas holidays and day of special leave granted by the Director-General : the Laboratory will be closed from Saturday, 20th December 2008 to Sunday, 4th January 2009 inclusive (without deduction of annual leave). The first working day in the New Year will be Monday, 5th January 2009. Human Resources Department Tel. 73903

  1. A Novel Scheme to Relieve Parking Pressure at Tourist Attractions on Holidays

    Directory of Open Access Journals (Sweden)

    Juan Li

    2016-02-01

    Full Text Available Parking is a key component of urban transportation managements and has become a severe problem at many tourist attractions during holidays in China. This paper presents a novel scheme to relieve the holiday parking pressure. Based on the perspectives of the activity-based travel characteristics, we propose an effort to develop parking alternatives by utilizing existing traffic facilities. A conceptual model is employed to explore the influence of additional leisure activity of parking and various options of transportation modes. The results indicate that compared to commuters, the scenery is the major factor affecting tourists’ parking preference, besides parking time and cost. Based on the finding, a tourist-centered strategy is designed to satisfy the peak hours parking demands in order to relieve the parking pressure at tourist attractions during holidays.

  2. Sun behaviour and personal UVR exposure among Europeans on short term holidays

    DEFF Research Database (Denmark)

    Petersen, Bibi; Triguero-Mas, Margarita; Maier, Bernhard

    2015-01-01

    Solar ultraviolet radiation (UVR) is known to be the main cause of skin cancer, the incidence of which is rising with national differences across Europe. With this observation study we aimed to determine the impact of nationality on sun behaviour and personal UVR exposure on sun and ski holidays....... 25 Danish and 20 Spanish sun-seekers were observed during a sun holiday in Spain, and 26 Danish and 27 Austrian skiers were observed during a ski holiday in Austria. The participants recorded their location and clothing in diaries. Personal time-logged UVR data were recorded as standard erythema...... doses (SEDs) by an electronic UVR dosimeter worn on the wrist. Danish sun-seekers were outdoors for significantly longer, received significant higher percentages of ambient UVR, and received greater accumulated UVR doses than Spanish sun-seekers. Danish skiers were also outdoors for significantly longer...

  3. 7 CFR 301.87-7 - Assembly and inspection of regulated articles.

    Science.gov (United States)

    2010-01-01

    ... Animal and Plant Health Inspection Service, Plant Protection and Quarantine, Domestic and Emergency... regulated article. 8 Inspectors are assigned to local offices of Plant Protection and Quarantine, which are... PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE DOMESTIC QUARANTINE NOTICES Sugarcane...

  4. [Improving the continuous care process in primary care during weekends and holidays: redesigning and FMEA].

    Science.gov (United States)

    Cañada Dorado, A; Cárdenas Valladolid, J; Espejo Matorrales, F; García Ferradal, I; Sastre Páez, S; Vicente Martín, I

    2010-01-01

    To describe a project carried out in order to improve the process of Continuous Health Care (CHC) on Saturdays and bank holidays in Primary Care, area number 4, Madrid. The aim of this project was to guarantee a safe and error-free service to patients receiving home health care on weekends. The urgent need for improving CHC process was identified by the Risk Management Functional Unit (RMFU) of the area. In addition, some complaints had been received from the nurses involved in the process as well as from their patients. A SWOT (Strengths, Weaknesses, Opportunities and Threats) analysis performed in 2009 highlighted a number of problems with the process. As a result, a project for improvement was drawn up, to be implemented in the following stages: 1. Redesigning and improving the existing process. 2. Application of failure mode and effect analysis (FMEA) to the new process. 3. Follow up, managing and leading the project. 4. Nurse training. 5. Implementing the process in the whole area. 6. CHC nurse satisfaction surveys. After carrying out this project, the efficiency and level of automation improved considerably. Since implementation of the process enhancement measures, no complaints have been received from patients and surveys show that CHC nurse satisfaction has improved. By using FMEA, errors were given priority and enhancement steps were taken in order to: Inform professionals, back-up personnel and patients about the process. Improve the specialist follow-up report. Provide training in ulcer patient care. The process enhancement, and especially its automation, has resulted in a significant step forward toward achieving greater patient safety. FMEA was a useful tool, which helped in taking some important actions. Finally, CHC nurse satisfaction has clearly improved. Copyright © 2009 SECA. Published by Elsevier Espana. All rights reserved.

  5. Bisphosphonate Drug Holiday and Fracture Risk: A Population-Based Cohort Study.

    Science.gov (United States)

    Adams, Annette L; Adams, John L; Raebel, Marsha A; Tang, Beth T; Kuntz, Jennifer L; Vijayadeva, Vinutha; McGlynn, Elizabeth A; Gozansky, Wendolyn S

    2018-03-12

    Holidays from bisphosphonates (BPs) may help to prevent rare adverse events like atypical femoral fractures, but may be appropriate only if risk of osteoporosis-related fractures does not increase. Our objective was to compare the incidence of osteoporosis-related fractures among women who had a bisphosphonate (BP) holiday to those who continued use BPs. This retrospective cohort study, conducted within 4 Kaiser Permanente integrated health system regions, included 39,502 women aged ≥45 years with ≥3 years exposure to BP. Participants with a BP holiday (≥12 months with no use) were compared to persistent (use with ≥50% adherence) and non-persistent (use with holiday (n = 11,497), non-persistent user (n = 10,882), and persistent user groups (n = 17,123) were observed for 156,657 person-years. A total of 5,199 osteoporosis-related fractures (including 1,515 hip fractures and 2,147 vertebral fractures) were observed. Compared to the persistent use group, there was a slight difference in overall osteoporosis-related fracture risk (HR 0.92, 95% CI 0.84-0.99)and no difference in hip fracture risk (HR 0.95, 95% CI 0.83-1.10) for the BP holiday group. A slight reduction in risk of vertebral fracture was observed (HR 0.83, 95% CI 0.74-0.95). Compared to the non-persistent user group, the BP holiday group was at decreased risk for osteoporosis-related fractures (HR 0.71, 95% CI 0.65-0.79), vertebral fractures (HR 0.68, 95% CI 0.59-0.78), and hip fractures (HR 0.59; 95% CI 0.50-0.70). Women who undertake a BP holiday from BP of ≥12 months duration for any reason after ≥3 years of BP use do not appear to be at greater risk of osteoporosis-related fragility fracture, hip, or vertebral fractures compared to ongoing BP users. In our cohort, BP holiday remains a viable strategy for balancing the benefits and potential harms associated with long-term BP use. This article is protected by copyright. All rights reserved. This article is protected by copyright

  6. Bisphosphonate drug holidays in postmenopausal osteoporosis: effect on clinical fracture risk.

    Science.gov (United States)

    Mignot, M A; Taisne, N; Legroux, I; Cortet, B; Paccou, J

    2017-12-01

    A cohort of 183 postmenopausal women, who had either discontinued or continued bisphosphonates (BPs) after first-line therapy, was used to investigate the relationships between "drug holiday" and clinical fracture. The risk of new clinical fractures was found to be 40% higher in women who had taken a BP "drug holiday." BPs are the most widely used treatment for postmenopausal osteoporosis. The optimal treatment duration, however, remains unclear. The purpose of this study was to evaluate the fracture risk in postmenopausal women with osteoporosis after discontinuing BP treatment (BP "drug holiday"). A retrospective analysis was performed at Lille University Hospital (LUH) on postmenopausal women with osteoporosis who had taken a "drug holiday" or continued treatment after first-line BP therapy (3 to 5 years). The occurrence of new clinical fractures during follow-up was also explored. Cox proportional hazards models were used to investigate the relationships between BP "drug holiday" and the occurrence of clinical fractures, while controlling for confounding factors. Survival without new clinical fractures was analyzed using Kaplan-Meier curves and log-rank tests. One hundred eighty-three women (mean age: 61.8 years; SD: 8.7) who had previously undergone BP treatment for 3 to 5 years were enrolled in our study. The patients had received alendronate (n = 81), risedronate (n = 73), zoledronic acid (n = 20), and ibandronate (n = 9). In 166 patients ("drug holiday" group: n = 31; continuous-treatment group: n = 135), follow-up ranged from 6 to 36 months (mean duration: 31.8 months; SD: 8.2). The incidences of new clinical fractures during follow-up were 16.1% (5/31) and 11.9% (16/135). After full adjustment, the hazard ratio of new clinical fractures among "drug holiday" patients was 1.40 (95% CI: 1.12-1.60; p = 0.0095). After first-line BP therapy in postmenopausal women with osteoporosis, the risk of new clinical fractures was 40% higher in

  7. The Comparative Analysis of Senior and Non-Senior Package Holiday Travelers' Tourism Product Preferences

    Directory of Open Access Journals (Sweden)

    Maria Johann

    2015-10-01

    Full Text Available Tourism products are systemic products which offer multiple value to tourists in multiple aspects to satisfy their needs, however, tourists' preferences vary in terms of travelers' characteristics. The current study attempts to analyse senior and non-senior package holiday travelers' preferences with respect to tourism product attributes. The surveyed sample of 463 tourists spent their holiday on the coach tours in Poland in 2013. The main implication of this research for tourism product managers is that they have to focus on providing tourists with well suited packages and position appropriately by selecting suitable communication strategies for selected target segments.

  8. Robotic inspection technology-process an toolbox

    Energy Technology Data Exchange (ETDEWEB)

    Hermes, Markus [ROSEN Group (United States). R and D Dept.

    2005-07-01

    Pipeline deterioration grows progressively with ultimate aging of pipeline systems (on-plot and cross country). This includes both, very localized corrosion as well as increasing failure probability due to fatigue cracking. Limiting regular inspecting activities to the 'scrapable' part of the pipelines only, will ultimately result into a pipeline system with questionable integrity. The confidence level in the integrity of these systems will drop below acceptance levels. Inspection of presently un-inspectable sections of the pipeline system becomes a must. This paper provides information on ROSEN's progress on the 'robotic inspection technology' project. The robotic inspection concept developed by ROSEN is based on a modular toolbox principle. This is mandatory. A universal 'all purpose' robot would not be reliable and efficient in resolving the postulated inspection task. A preparatory Quality Function Deployment (QFD) analysis is performed prior to the decision about the adequate robotic solution. This enhances the serviceability and efficiency of the provided technology. The word 'robotic' can be understood in its full meaning of Recognition - Strategy - Motion - Control. Cooperation of different individual systems with an established communication, e.g. utilizing Bluetooth technology, support the robustness of the ROSEN robotic inspection approach. Beside the navigation strategy, the inspection strategy is also part of the QFD process. Multiple inspection technologies combined on a single carrier or distributed across interacting container must be selected with a clear vision of the particular goal. (author)

  9. School Holiday Food Provision in the UK: A Qualitative Investigation of Needs, Benefits, and Potential for Development.

    Science.gov (United States)

    Graham, Pamela Louise; Crilley, Eilish; Stretesky, Paul B; Long, Michael A; Palmer, Katie Jane; Steinbock, Eileen; Defeyter, Margaret Anne

    2016-01-01

    Access to an adequate supply of nutritious food has been recognized as a basic human right. However, many families across the UK face food insecurity, which is thought to be exacerbated during school holidays. To address this issue, some schools and community groups have chosen to roll out holiday clubs, though research into the effectiveness of such interventions is limited and no studies to date have evaluated holiday clubs being organized through schools. In an effort to address some of the limitations in the research literature, the current qualitative investigation utilized semi-structured interviews with staff involved in holiday clubs in school and community venues with the aim of gaging their views on the need for and benefits of holiday food provision in addition to potential areas for development. The investigation revealed that staff perceived many families to be facing food insecurity and isolation during the school holidays, which may be alleviated through holiday club provision. Holiday clubs were viewed as a valuable source of support for children and adults, providing food, activities, and learning experiences. Staff were keen to see them implemented on a wider scale in future but suggested some areas that require attention in any future development of such provision. Findings are discussed in relation to current research, policy, and practice surrounding the health and wellbeing of children and families.

  10. Taking a Toll(Toll-free holidays bring massive congestion and opposition by highway operators By Zhou Xiaoyan)

    Institute of Scientific and Technical Information of China (English)

    2012-01-01

    Dubbed the "'Golden Week," the National Day holiday (normally October 1-7) is a traditional peak travel period for many Chinese who hit the road. But this year's holiday was different from years past: most motorists across the country were exempt from paying toll fees.

  11. School holiday food provision in the UK: A qualitative investigation of needs, benefits and potential for development

    Directory of Open Access Journals (Sweden)

    Pamela Louise Graham

    2016-08-01

    Full Text Available Access to an adequate supply of nutritious food has been recognized as a basic human right. However, many families across the UK face food insecurity, which is thought to be exacerbated during school holidays. To address this issue, some schools and community groups have chosen to roll out holiday clubs, though research into the effectiveness of such interventions is limited and no studies to date have evaluated holiday clubs being organized through schools. In an effort to address some of the limitations in the research literature, the current qualitative investigation utilized semi-structured interviews with staff involved in holiday clubs in school and community venues with the aim of gauging their views on the need for and benefits of holiday food provision in addition to potential areas for development. The investigation revealed that staff perceived many families to be facing food insecurity and isolation during the school holidays, which may be alleviated through holiday club provision. Holiday clubs were viewed as a valuable source of support for children and adults, providing food, activities and learning experiences. Staff were keen to see them implemented on a wider scale in future but suggested some areas that require attention in any future development of such provision. Findings are discussed in relation to current research, policy and practice surrounding the health and wellbeing of children and families.

  12. Dynamic analysis of holiday travel behavior with integrated multimodal travel information usage : a life-oriented approach

    NARCIS (Netherlands)

    Wang, B.; Shao, C.; Ji, X.

    2017-01-01

    The Integrated Multimodal Travel Information (IMTI) plays an important role in the evolution process of holiday travel behaviour, which is seldom investigated. To fill this gap, this study analyses holiday travel behaviour dynamics with IMTI usage, based on the life-oriented approach. IMTI usage is

  13. Automated Inspection of Aircraft

    Science.gov (United States)

    1998-04-01

    This report summarizes the development of a robotic system designed to assist aircraft inspectors by remotely deploying non-destructive inspection (NDI) sensors and acquiring, processing, and storing inspection data. Carnegie Mellon University studie...

  14. Optimising import phytosanitary inspection

    NARCIS (Netherlands)

    Surkov, I.

    2007-01-01

    Keywords: quarantine pest, plant health policy, optimization, import phytosanitary inspection, ‘reduced checks’, optimal allocation of resources, multinomial logistic regression, the Netherlands World trade is a major vector of spread of quarantine plant pests. Border phytosanitary inspection

  15. Technical objectives of inspection

    International Nuclear Information System (INIS)

    Sorenson, R.J.; Stewart, K.B.; Schneider, R.A.

    1976-01-01

    The various technical objectives of inspection are discussed in a very general manner. The discussion includes how the inspection function is related to the assumed threat, the various degrees of assurance and reliance on criteria, and the hierarchy of assurance which is obtained from the various types or levels of inspection

  16. Software Formal Inspections Guidebook

    Science.gov (United States)

    1993-01-01

    The Software Formal Inspections Guidebook is designed to support the inspection process of software developed by and for NASA. This document provides information on how to implement a recommended and proven method for conducting formal inspections of NASA software. This Guidebook is a companion document to NASA Standard 2202-93, Software Formal Inspections Standard, approved April 1993, which provides the rules, procedures, and specific requirements for conducting software formal inspections. Application of the Formal Inspections Standard is optional to NASA program or project management. In cases where program or project management decide to use the formal inspections method, this Guidebook provides additional information on how to establish and implement the process. The goal of the formal inspections process as documented in the above-mentioned Standard and this Guidebook is to provide a framework and model for an inspection process that will enable the detection and elimination of defects as early as possible in the software life cycle. An ancillary aspect of the formal inspection process incorporates the collection and analysis of inspection data to effect continual improvement in the inspection process and the quality of the software subjected to the process.

  17. Inspection of Candu Nuclear Reactor Fuel Channels

    International Nuclear Information System (INIS)

    Baron, J.; Jarvis, G.N.; Dolbey, M.P.; Hayter, D.M.

    1986-01-01

    The Channel Inspection and Gauging Apparatus of Reactors (CIGAR) is a fully atomated, remotely operated inspection system designed to perform multi-channel, multi-task inspection of CANDU reactor fuel channels. Ultrasonic techniques are used for flaw detection, (with a sensitivity capable of detecting a 0.075 mm deep notch with a signal to noise ratio of 10 dB) and pressure tube wall thickness and diameter measurements. Eddy currrent systems are used to detect the presence of spacers between the coaxial pressure tube and calandria tube, as well as to measure their relative spacing. A servo-accelerometer is used to estimate the sag of the fuel channels. This advanced inspection system was commissioned and declared in service in September 1985. The paper describes the inspection systems themselves and discussed the results achieved to-date. (author) [pt

  18. The Rehearsal and Performance of Holiday Music: Philosophical Issues in "Stratechuk v. Board of Education"

    Science.gov (United States)

    Perrine, William M.

    2016-01-01

    This philosophical study addresses the implications of the legal case "Stratechuk v. Board of Education" ruling that a policy prohibiting the performance of religious-themed holiday music did not violate the United States Constitution. Two questions are investigated: the differences between the classroom study and public performance of…

  19. Predictors of hangover during a week of heavy drinking on a holiday

    DEFF Research Database (Denmark)

    Hesse, Morten; Tutenges, Sébastien

    2010-01-01

    units in the whole sample. The severity of hangover increased significantly during a week of heavy drinking and there was a time * number of drinks interaction, indicating that the impact of alcohol consumed on hangover became more pronounced later in the week. Levels of drinking before the holiday did...

  20. Time to Make Your List for the NCI at Frederick Holiday Market | Poster

    Science.gov (United States)

    The final Holiday Market of 2017 will take place on Tuesday, December 19, in Building 549. The event, which runs from 11:00 am–1:30 pm, will feature nearly two dozen local vendors and artisans. From bags and boards to meats and sweets, the market promises to have something for everyone.

  1. 5 CFR 610.405 - Holiday for part-time employees on flexible work schedules.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Holiday for part-time employees on... part-time employees on flexible work schedules. If a part-time employee is relieved or prevented from... falls on a nonworkday of a part-time employee, he or she is not entitled to an in-lieu-of day for that...

  2. State Patty's Day: College Student Drinking and Local Crime Increased on a Student-Constructed Holiday

    Science.gov (United States)

    Lefkowitz, Eva S.; Patrick, Megan E.; Morgan, Nicole R.; Bezemer, Denille H.; Vasilenko, Sara A.

    2012-01-01

    College student alcohol consumption is a major concern, and is known to increase during the celebration of special events. This study examined a student-constructed holiday, State Patty's Day, at a university with a dominant drinking culture using three sources of data--coded data from Facebook groups, daily web surveys from first-year students (N…

  3. Occupancy modeling and estimation of the holiday darter species complex within the Etowah River system

    Science.gov (United States)

    Anderson, Gregory B.; Freeman, Mary C.; Hagler, Megan M.; Freeman, Byron J.

    2012-01-01

    Documenting the status of rare fishes is a crucial step in effectively managing populations and implementing regulatory mechanisms of protection. In recent years, site occupancy has become an increasingly popular metric for assessing populations, but species distribution models that do not account for imperfect detection can underestimate the proportion of sites occupied and the strength of the relationship with a hypothesized covariate. However, valid detection requires temporal or spatial replication, which is often not feasible due to logistical or budget constraints. In this study, we used a method that allowed for spatial replication during a single visit to evaluate the current status of the holiday darter species complex, Etheostoma sp. cf. E. brevirostrum, within the Etowah River system. Moreover, the modeling approach used in this study facilitated comparisons of factors influencing stream occupancy as well as species detection within sites. The results suggest that there is less habitat available for the Etowah holiday darter form (Etheostoma sp. cf. E. brevirostrum B) than for the Amicalola holiday darter form (Etheostoma sp. cf. E. brevirostrum A). Additionally, occupancy models suggest that even small decreases in forest cover within these headwater systems adversely affect holiday darter populations.

  4. DENTAL STUDENTS' PSYCHOLOGICAL WELL-BEING DURING EXAMINATION PERIOD AND HOLIDAY.

    Science.gov (United States)

    Preoteasa, Cristina Teodora; Imre, Marina; Preoteasa, Elena

    2015-01-01

    Psychological well-being is recognized as an important health component, which influences the behavior, ability to cope with stressful events, work performance, and generally the ability to achieve one's full potential. To comparatively assess the psychological well-being of dental students during the summer semester examination period and summer holiday. A single-arm, prospective study was conducted in second year dental students from the Faculty of Dental Medicine, Bucharest. The psychological well-being was assessed using the WHO-Five Well-being Index. Students' psychological well-being was statistically significantly better during the summer holiday (median=19) than during the summer semester examination period (median = 11.5), Z = 3.69, p holiday, but it was significantly correlated with the WHO-Five Well-being Index score corresponding to the summer holiday, and no association was observed with the WHO-Five Well-being Index score corresponding to the summer semester examination period. Within the limits of this study, psychological well-being is likely to be negatively influenced, on a fairly large scale, by the semester examination period. Therefore, it is recommended to identify the most appropriate methods of examination with regards to the psychological load that might be a threat to the validity of students' evaluation. Additionally, training students about adequate coping strategies, designed as interventions at individual or group level, may be required.

  5. Effect of the Holiday Season on Weight Gain: A Narrative Review.

    Science.gov (United States)

    Díaz-Zavala, Rolando G; Castro-Cantú, María F; Valencia, Mauro E; Álvarez-Hernández, Gerardo; Haby, Michelle M; Esparza-Romero, Julián

    2017-01-01

    Several studies suggest that the holiday season, starting from the last week of November to the first or second week of January, could be critical to gaining weight. This study aims to review the literature to determine the effects of the holidays on body weight. In studies of adults, a significant weight gain was consistently observed during this period (0.4 to 0.9 kg, p 0.05) during this period. Among individuals with obesity who attempt to lose weight, an increase in weight was observed (0.3 to 0.9 kg, significant in some but not in all studies), as well as increase in weight in motivated self-monitoring people (0.4 to 0.6%, p holidays (phone calls and daily mailing) appeared to prevent weight gain, but information is limited. The holiday season seems to increase body weight in adults, even in participants seeking to lose weight and in motivated self-monitoring people, whereas in children, adolescents, and college students, very few studies were found to make accurate conclusions.

  6. "Did You Enjoy Your Holiday?" Can Residential Outdoor Learning Benefit Mainstream Schooling?

    Science.gov (United States)

    Christie, Beth; Higgins, Peter; McLaughlin, Pat

    2014-01-01

    In the United Kingdom there is a long tradition of residential outdoor learning provision, but to date there is limited research evidence for the direct educational benefits of such experiences, and to both critics and supporters the distinction between such visits and "holidays in school time" is not always apparent. This paper…

  7. Language-Learning Holidays: What Motivates People to Learn a Minority Language?

    Science.gov (United States)

    O'Rourke, Bernadette; DePalma, Renée

    2017-01-01

    In this article, we examine the experiences of 18 Galician language learners who participated in what Garland [(2008). "The minority language and the cosmopolitan speaker: Ideologies of Irish language learners" (Unpublished PhD thesis). University of California, Santa Barbara] refers to as a "language-learning holiday" in…

  8. A non-foodborne norovirus outbreak among school children during a skiing holiday, Austria, 2007.

    Science.gov (United States)

    Kuo, Hung-Wei; Schmid, Daniela; Schwarz, Karin; Pichler, Anna-Margaretha; Klein, Heidelinde; König, Christoph; de Martin, Alfred; Allerberger, Franz

    2009-01-01

    Norovirus is increasingly recognized as a leading cause of outbreaks of foodborne disease. We report on an outbreak in Austria that reached a total of 176 cases, affecting pupils and teachers from four schools on a skiing holiday in a youth hostel in the province of Salzburg in December 2007. A questionnaire was sent to the four schools in order to obtain data from persons attending the school trip on disease status, clinical onset, duration of illness and hospitalization. A cohort study was undertaken to identify the sources of infection. The school trip attendees were interviewed by questionnaire or face-to-face on their exposure to food items from the menu provided by the hostel owner. Of the 284 school holiday-makers, 176 fitted the definition of an outbreak case (attack rate 61.9%). A total of 264 persons on the ski holiday participated in the cohort study (response rate 93%). The day-by-day food-specific analyses did not find any food items served on any of five days (December 8-12) of the holiday to be associated with infection risk. The day-specific risk analyses revealed Monday December 10 (RR: 9.04; 95% CI: 6.02-13.6; P Tourism is one of the primary industries in Austria. Timely involvement of the relevant public health authorities is essential in any outbreak of norovirus gastroenteritis, irrespective of its genesis.

  9. Effect of the Holiday Season on Weight Gain: A Narrative Review

    Directory of Open Access Journals (Sweden)

    Rolando G. Díaz-Zavala

    2017-01-01

    Full Text Available Several studies suggest that the holiday season, starting from the last week of November to the first or second week of January, could be critical to gaining weight. This study aims to review the literature to determine the effects of the holidays on body weight. In studies of adults, a significant weight gain was consistently observed during this period (0.4 to 0.9 kg, p0.05 during this period. Among individuals with obesity who attempt to lose weight, an increase in weight was observed (0.3 to 0.9 kg, significant in some but not in all studies, as well as increase in weight in motivated self-monitoring people (0.4 to 0.6%, p<0.001. Programs focused on self-monitoring during the holidays (phone calls and daily mailing appeared to prevent weight gain, but information is limited. The holiday season seems to increase body weight in adults, even in participants seeking to lose weight and in motivated self-monitoring people, whereas in children, adolescents, and college students, very few studies were found to make accurate conclusions.

  10. 5 CFR 610.406 - Holiday for employees on compressed work schedules.

    Science.gov (United States)

    2010-01-01

    ... REGULATIONS HOURS OF DUTY Flexible and Compressed Work Schedules § 610.406 Holiday for employees on compressed work schedules. (a) If a full-time employee is relieved or prevented from working on a day designated... number of hours of the compressed work schedule on that day. (b) If a part-time employee is relieved or...

  11. A train dispatching model based on fuzzy passenger demand forecasting during holidays

    Directory of Open Access Journals (Sweden)

    Fei Dou Dou

    2013-03-01

    Full Text Available Abstract: Purpose: The train dispatching is a crucial issue in the train operation adjustment when passenger flow outbursts. During holidays, the train dispatching is to meet passenger demand to the greatest extent, and ensure safety, speediness and punctuality of the train operation. In this paper, a fuzzy passenger demand forecasting model is put up, then a train dispatching optimization model is established based on passenger demand so as to evacuate stranded passengers effectively during holidays. Design/methodology/approach: First, the complex features and regularity of passenger flow during holidays are analyzed, and then a fuzzy passenger demand forecasting model is put forward based on the fuzzy set theory and time series theory. Next, the bi-objective of the train dispatching optimization model is to minimize the total operation cost of the train dispatching and unserved passenger volume during holidays. Finally, the validity of this model is illustrated with a case concerned with the Beijing-Shanghai high-speed railway in China. Findings: The case study shows that the fuzzy passenger demand forecasting model can predict outcomes more precisely than ARIMA model. Thus train dispatching optimization plan proves that a small number of trains are able to serve unserved passengers reasonably and effectively. Originality/value: On the basis of the passenger demand predictive values, the train dispatching optimization model is established, which enables train dispatching to meet passenger demand in condition that passenger flow outbursts, so as to maximize passenger demand by offering the optimal operation plan.

  12. 教你正确用(二十九)—美国的节假日(下)%A Cup of English Holidays(Part2)

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    @@ In Part One of this series on holidays, we talked about important holidays up to the month of September. Today, as promised, we'll pick up where we left off and take a look at holidays in the fall and winter months.

  13. 26 CFR 301.7503-1 - Time for performance of acts where last day falls on Saturday, Sunday, or legal holiday.

    Science.gov (United States)

    2010-04-01

    ... falls on Saturday, Sunday, or legal holiday. 301.7503-1 Section 301.7503-1 Internal Revenue INTERNAL... where last day falls on Saturday, Sunday, or legal holiday. (a) In general. Section 7503 provides that... falls on a Saturday, Sunday, or legal holiday, such act shall be considered performed timely if...

  14. Randomization of inspections

    International Nuclear Information System (INIS)

    Markin, J.T.

    1989-01-01

    As the numbers and complexity of nuclear facilities increase, limitations on resources for international safeguards may restrict attainment of safeguards goals. One option for improving the efficiency of limited resources is to expand the current inspection regime to include random allocation of the amount and frequency of inspection effort to material strata or to facilities. This paper identifies the changes in safeguards policy, administrative procedures, and operational procedures that would be necessary to accommodate randomized inspections and identifies those situations where randomization can improve inspection efficiency and those situations where the current nonrandom inspections should be maintained. 9 refs., 1 tab

  15. Changes in growth and sleep across school nights, weekends and a winter holiday period in two Australian schools.

    Science.gov (United States)

    Agostini, Alex; Pignata, Silvia; Camporeale, Roberta; Scott, Kathryn; Dorrian, Jillian; Way, Anne; Ryan, Paul; Martin, James; Kennedy, Declan; Lushington, Kurt

    2018-01-26

    Studies suggest that there may be an association between sleep and growth; however, the relationship is not well understood. Changes in biology and external factors such as school schedule heavily impact the sleep of adolescents, during a critical phase for growth. This study assessed the changes in sleep across school days, weekends and school holidays, while also measuring height and weight changes, and self-reported alterations in food intake and physical activity. The impact of morningness-eveningness (M-E) on height change and weight gain was also investigated. In a sample of 63 adolescents (mean age = 13.13, SD = 0.33, 31 males) from two independent schools in South Australia, height and weight were measured weekly for 4 weeks prior to the school holidays and 4 weeks after the school holidays. Participants also completed a Morningness/Eveningness Scale and 7-day sleep, diet and physical activity diaries prior to, during and after the school holidays. Participants at one school had earlier wake times during the weekends than participants attending the other school, leading to a significantly shorter sleep duration on weekends for those participants. Regardless of school, sleep was significantly later and longer during the holidays (p holiday weeks. For those attending the school with limited sleep in opportunities, growth after the holidays was lower for those with greater evening preference, whereas for those at the other school, growth was greater for those with greater evening preference. The increase in average weight from pre- to post-holidays was greater for those attending the school with limited opportunities to sleep longer. Participants reported greater food intake during the holidays compared to school days and greater physical activity levels on weekends compared to school days, and school days compared to holidays. Results suggest that time of day preference may impact growth, with evening types who cannot sleep in growing at a slower rate

  16. 9 CFR 381.197 - Imported products; foreign inspection certificates required.

    Science.gov (United States)

    2010-01-01

    ... AND VOLUNTARY INSPECTION AND CERTIFICATION POULTRY PRODUCTS INSPECTION REGULATIONS Imported Poultry... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Imported products; foreign inspection certificates required. 381.197 Section 381.197 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE...

  17. 9 CFR 381.199 - Inspection of poultry products offered for entry.

    Science.gov (United States)

    2010-01-01

    ... AND VOLUNTARY INSPECTION AND CERTIFICATION POULTRY PRODUCTS INSPECTION REGULATIONS Imported Poultry... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Inspection of poultry products offered for entry. 381.199 Section 381.199 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE...

  18. 75 FR 56502 - National Advisory Committee on Meat and Poultry Inspection

    Science.gov (United States)

    2010-09-16

    ... Advisory Committee on Meat and Poultry Inspection AGENCY: Food Safety and Inspection Service, USDA. ACTION... and Poultry Inspection (NACMPI) will hold a public meeting on September 29-30, 2010, to review and... disks or CD-ROMs: Send to National Advisory Committee on Meat and Poultry Inspection, USDA, FSIS, 14th...

  19. 77 FR 47028 - National Advisory Committee on Meat and Poultry Inspection

    Science.gov (United States)

    2012-08-07

    ... Inspection Service [Docket No. FSIS-2012-0030] National Advisory Committee on Meat and Poultry Inspection... Agriculture National Advisory Committee on Meat and Poultry Inspection. SUMMARY: The U.S. Department of Agriculture intends to reestablish the National Advisory Committee on Meat and Poultry Inspection. The purpose...

  20. Methodology for qualification of in-service inspection systems for WWER nuclear power plants. A publication of the extrabudgetary programme on the safety of WWER and RBMK nuclear power plants

    International Nuclear Information System (INIS)

    1998-03-01

    Program was initiated by IAEA in 1990 with the aim to assist the countries of Central and Eastern Europe and former Soviet Union in evaluating the safety of their first generation WWER-440/230 nuclear power plants. The main objectives were: to identify major design and operational safety issues; to establish international consensus on priorities for safety improvements; and to provide assistance in the review of the competence and and adequacy of safety improvement programs. The scope was extended in 1992 to include RBMK, WWER-440/312 and WWER-1000 plants in operation and under construction. Integrity of primary circuit is fundamental for the safe operation of any nuclear power plant. In-service inspection (ISI) in general terms and in particular, non-destructive tests (NDT) play a key role in maintaining primary circuit integrity. This report provides a methodology for qualification of ISI systems which might be used by WWER operating countries as a commonly accepted basis for further development of the necessary qualification related infrastructures. It also provides several qualification principles defining the administrative framework needed for the practical implementation of the methodology, a description of the process of qualification of an inspection system, specifying its minimum technical and documentation related requirements, as well as specific requirements with regard to the NDT procedures, equipment and personnel to be qualified and the test specimen to be used in practical trials. Finally, the report suggests an appropriate distribution of responsibilities among all the parties involved in a qualification process, based on international practice