WorldWideScience

Sample records for highway research project

  1. 75 FR 19670 - Marine Highway Projects

    Science.gov (United States)

    2010-04-15

    ... DEPARTMENT OF TRANSPORTATION Maritime Administration Marine Highway Projects ACTION: Solicitation of applications for Marine highway projects. SUMMARY: The Department of Transportation is soliciting applications for Marine Highway Projects as specified in the America's Marine Highway Program Final Rule, MARAD...

  2. 46 CFR 393.4 - Marine Highway Projects.

    Science.gov (United States)

    2010-10-01

    ... transportation system research, data, and analysis used to develop or support the business model. (vii) Proposed... Highway Projects. (9) Utilize current or future Federal funding mechanisms, as appropriate, to support the...) Organization. Provide the organizational structure of the proposed project, including business affiliations...

  3. Causative factors of cost overrun in highway projects of Sindh province of Pakistan

    Science.gov (United States)

    Sohu, S.; Halid, A.; Nagapan, S.; Fattah, A.; Latif, I.; Ullah, K.

    2017-11-01

    Cost overrun is an increase of cost of project from approved budget which was signed by parties at the time of tender. Cost overrun in construction of highway projects is a common problem worldwide and construction industry of Pakistan is also facing this crucial problem of cost overrun in highway projects of Pakistan. The main objective of this research is to identify the causative factors of cost overrun in highway projects of Sindh province of Pakistan. A well designed questionnaire was developed based on 64 common factors of cost overrun from literature review. Developed questionnaire was distributed among selected 30 experts from owner/client, designer/consultant and contractor who have experience more than 20 years’ experience in highway projects. The collected data was statistical analyzed. After analysis results showed that delay process in payment by client, inadequate planning, client interference, poor contract management, delay of decision making, change of scope of project and financial problems faced by client were most causative factors of cost overrun in highway projects. This research will provide alertness to stakeholders of highway projects of Sindh province to avoid cost overrun in projects.

  4. Highway for life demonstration project : LA 511 (70th Street). Research project capsule.

    Science.gov (United States)

    2013-06-01

    The Louisiana Department of Transportation and Development (LADOTD), : has been awarded a Highways for Life (HfL) grant to be used on the LA 511 : widening project in Caddo Parish. The LA 511 corridor is one of the busiest in the : Shreveport, Louisi...

  5. Cost estimate modeling of transportation management plans for highway projects : [research brief].

    Science.gov (United States)

    2012-05-01

    Highway rehabilitation and reconstruction projects frequently cause road congestion and increase safety concerns while limiting access for road users. State Transportation Agencies (STAs) are challenged to find safer and more efficient ways to renew ...

  6. Highways of the future : a strategic plan for highway infrastructure research and development

    Science.gov (United States)

    2008-07-01

    This Highways of the FutureA Strategic Plan for Highway Infrastructure Research and Development was developed in response to a need expressed by the staff of the Federal Highway Administration (FHWA) Office of Infrastructure Research and Developme...

  7. Preliminary engineering cost trends for highway projects.

    Science.gov (United States)

    2011-10-21

    Preliminary engineering (PE) for a highway project encompasses two efforts: planning to minimize the physical, social, and human environmental impacts of projects and engineering design to deliver the best alternative. PE efforts begin years in advan...

  8. 25 CFR 170.144 - What are eligible highway safety projects?

    Science.gov (United States)

    2010-04-01

    ... RESERVATION ROADS PROGRAM Indian Reservation Roads Program Policy and Eligibility Highway Safety Functions... management system; (g) Education and outreach highway safety programs, such as use of child safety seats... 25 Indians 1 2010-04-01 2010-04-01 false What are eligible highway safety projects? 170.144...

  9. Transportation Infrastructure: Managing the Costs of Large-Dollar Highway Projects

    Science.gov (United States)

    1997-02-01

    The General Accounting Office (GAO) was requested to assess the effectiveness of the Federal Highway Administration's (FHWA's) oversight of the costs of large-dollar highway and bridge projects (those with a total estimated cost of over $100 million)...

  10. West Virginia peer exchange : streamlining highway safety improvement program project delivery.

    Science.gov (United States)

    2015-01-01

    The West Virginia Division of Highways (WV DOH) hosted a Peer Exchange to share information and experiences : for streamlining Highway Safety Improvement Program (HSIP) project delivery. The event was held September : 22 to 23, 2014 in Charleston, We...

  11. The study of KBP of road construction workers of highway AIDS prevention project before and after intervention.

    Science.gov (United States)

    Liu, Dan; Dong, Si-Ping; Gao, Guang-Ming; Fan, Ming-Yu; Zhang, Zong-Jiu; Fang, Peng-Qian

    2013-10-01

    To get scientific basis for further health education through the research of the road construction workers' KBP before and after the interventions of highway AIDS prevention project. Multi-stage random sampling method was employeed to select workers of 8 sites from 14 sites along highway to investigate their AIDS knowledge, belief and performance (KBP) before and after highway AIDS prevention project. Over 90% of the investigated workers had ever heard about AIDS, and the non-skilled workers of lower educational level improved more after intervention. The correct answer rate of the three transmitting ways of AIDS of drivers which is the focused group of highway before and after intervention had the obvious statistical significance (Proad construction workers is effective and further health education of HIV prevention should be carried out among the road construction workers to improve their knowledge and awareness of avoiding the high-risk behaviors. Copyright © 2013 Hainan Medical College. Published by Elsevier B.V. All rights reserved.

  12. Revenue Risk Modelling and Assessment on BOT Highway Project

    Science.gov (United States)

    Novianti, T.; Setyawan, H. Y.

    2018-01-01

    The infrastructure project which is considered as a public-private partnership approach under BOT (Build-Operate-Transfer) arrangement, such as a highway, is risky. Therefore, assessment on risk factors is essential as the project have a concession period and is influenced by macroeconomic factors and consensus period. In this study, pre-construction risks of a highway were examined by using a Delphi method to create a space for offline expert discussions; a fault tree analysis to map intuition of experts and to create a model from the underlying risk events; a fuzzy logic to interpret the linguistic data of risk models. The loss of revenue for risk tariff, traffic volume, force majeure, and income were then measured. The results showed that the loss of revenue caused by the risk tariff was 10.5% of the normal total revenue. The loss of revenue caused by the risk of traffic volume was 21.0% of total revenue. The loss of revenue caused by the force majeure was 12.2% of the normal income. The loss of income caused by the non-revenue events was 6.9% of the normal revenue. It was also found that the volume of traffic was the major risk of a highway project because it related to customer preferences.

  13. Contractors perspective for critical factors of cost overrun in highway projects of Sindh, Pakistan

    Science.gov (United States)

    Sohu, Samiullah; Abdullah, Abd Halid; Nagapan, Sasitharan; Fattah, Abdul; Ullah, Kaleem; Kumar, Kanesh

    2017-10-01

    Construction industry of Pakistan is creating a number of opportunities in employment as well as plays a role model for economy development of the country. This construction industry has a serious issue of cost overrun in all construction projects especially in construction of highway projects. Cost overrun is a serious and critical issue in construction of highway projects which gives negative impact to construction practitioners because it is not only cross the approved budget but also approved time of the project. The main objective of this study is to find out critical factors causing cost overrun in highway projects of Sindh according to contractors' perspectives. Deep literature review was carried out and a total of 64 factors of cost overrun were identified. To achieve the objective, a questionnaire was designed and distributed among 16 selected respondents who have more than 20 years of experience in construction of highway projects. The results from analysis found that most critical factors of cost overrun in the order of importance include financial and cash flow difficulties faced by contractor, frequent changes in design, changes in price of materials, poor planning by client, change in scope of project, change in specification of materials and delay in taking decisions. This study will assist contractors to narrow down some of the critical factors that would lead to cost overrun, and therefore be prepared with the ways to mitigate these problems in construction of highway projects of Sindh province.

  14. Developing a Highway Safety Fundamentals Course : Research Project Capsule

    Science.gov (United States)

    2012-10-01

    Although the need for road : safety education was fi rst : recognized in the 1960s, : recently it has become an : increasingly urgent issue. To : fulfi ll the hefty goal set up by : the AASHTO Highway : Safety Strategy (cutting : traffi c fatalities ...

  15. Discussion on the method of environmental radiological impact assessment for the highway construction project

    International Nuclear Information System (INIS)

    Qiu Guohua

    2008-01-01

    Based on the characteristics and environmental radiological impact of the highway construction project, the basic procedure of environmental radiological impact assessment for the highway construction project is put forward, including analysis and determination of contamination sources, selection of evaluation factors, determination of assessment range and dose limit, environmental investigation, environmental impact prediction and assessment. The working method of each procedure is analyzed. (authors)

  16. Using electronic document management systems to manage highway project files.

    Science.gov (United States)

    2011-12-12

    "WisDOTs Bureau of Technical Services is interested in learning about the practices of other state departments of : transportation in developing and implementing an electronic document management system to manage highway : project files"

  17. Cost estimate modeling of transportation management plans for highway projects.

    Science.gov (United States)

    2012-05-01

    Highway rehabilitation and reconstruction projects frequently cause road congestion and increase safety concerns while limiting access for road users. State Transportation Agencies (STAs) are challenged to find safer and more efficient ways to renew ...

  18. NHDOT : process for municipally managed state aid highway program projects

    Science.gov (United States)

    2006-05-23

    The design and construction of Municipally Managed State Aid Highway Program projects must comply with the requirements in this guideline in order to receive State Aid under the applicable provisions of RSA 235. Under this process, State Aid Construc...

  19. West Virginia Peer Exchange : Streamlining Highway Safety Improvement Program Project Delivery - An RSPCB Peer Exchange

    Science.gov (United States)

    2014-09-01

    The West Virginia Division of Highways (WV DOH) hosted a Peer Exchange to share information and experiences for streamlining Highway Safety Improvement Program (HSIP) project delivery. The event was held September 23 to 24, 2014 in Charleston, West V...

  20. Current Situation of Highway Daily Maintenance Management in Beijing

    Directory of Open Access Journals (Sweden)

    Pan Feng Ming

    2016-01-01

    Full Text Available Combined with the industry property, characteristics and management needs of highway maintenance project in Beijing, through investigation and research of the highway daily maintenance management, the present situation of highway repair and maintenance is expounded from the aspects such as the determination of maintenance funds and plan, maintenance management mode, and so on. Then in order to explore the new mechanisms for market management of highway maintenance, the advantages and disadvantages of highway maintenance and minor repairment of Beijing are analyzed.

  1. Radioactive environmental impact assessment for a highway construction project in Guangdong province

    International Nuclear Information System (INIS)

    Qiu Guohua

    2009-01-01

    Based on the field environmental investigation and monitoring result, the radioactive environmental impact for a highway construction project in Guangdong province has been analyzed and assessed and forecacted. (authors)

  2. Federal-aid highways : FHWA has improved its risk management approach, but needs to improve its oversight of project costs.

    Science.gov (United States)

    2009-07-01

    The federal-aid highway program : provides about $33 billion a year to : states for highway projects. The : federal government provides : funding for and oversees this : program, while states largely : choose and manage the projects. : As requested, ...

  3. Dollars for lives : the effect of highway capital investments on traffic fatalities.

    Science.gov (United States)

    2014-10-01

    There is no research that links capital investments on highways with highway fatalities. Our research project aimed to fill : t : hat gap. We used state : - : level data from the 48 contiguous states of the U.S. from 1968 through 2010 to estimate the...

  4. ASSESSING THE IMPACT OF THE HIGHWAY 25 EXPANSION PROJECT ON AIR QUALITY IN MONTREAL USING GIS

    Directory of Open Access Journals (Sweden)

    Mioara CHIABURU

    2010-06-01

    Full Text Available Assessing the impact of the highway 25 expansion project on air quality in montreal using gis. The aim of the paper is to assess local air pollution implications of the Highway 25 expansion project from Montreal. The basic concept of the roadway air dispersion model consists in calculating air pollutant levels in the vicinity of a highway by considering it as a line source. To fulfill this assessment, GIS software was used in order to determine pollutant distribution around the study area based on data collected by existing air monitoring stations located in the City of Montreal. GIS interpolation methods, notably Kriging and Inverse Distance Weighted (IDW, was used to generate maps of pollutant concentrations across the study area. From the results, recommendations will be made in regards to the project and appropriate mitigatory alternatives suggested.

  5. Residential satisfaction close to highways : The impact of accessibility, nuisances and highway adjustment projects

    NARCIS (Netherlands)

    Hamersma, Marije; Tillema, Taede; Sussman, Joseph; Arts, Jos

    In this paper we focus on gaining insight into the residential satisfaction of households near highways, based on survey data collected among 1225 respondents in the Netherlands living within 1000 m from a highway. Ordinal regression was used to study the impact of highway externalities on

  6. Green Performance Contracting Strategy for Highway Construction Projects

    OpenAIRE

    2014-01-01

    With the growing awareness of sustainability and global climate change, state highway agencies are taking essential steps to reduce carbon emissions from highway infrastructure on a life cycle basis. While much is known regarding climate change mitigation and adaption strategies during highway operation, very little is understood about how climate change issues should be integrated into highway planning, delivery, and construction processes. This paper presents the current contracting pra...

  7. Tiering strategic environmental assessment and project environmental impact assessment in highway planning in Sao Paulo, Brazil

    International Nuclear Information System (INIS)

    Sanchez, Luis E.; Silva-Sanchez, Solange S.

    2008-01-01

    Constructing highways in dense urban areas is always a challenge. In Sao Paulo Metropolitan Region, heavy truck traffic contributes to clog streets and expressways alike. As part of the traffic neither originates nor head to the region, a peripheral highway has been proposed to reduce traffic problems. This project, called Rodoanel, is an expressway approximately 175 km long. The fact that the projected south and north sections would cross catchments that supply most of the metropolis water demand was strongly disputed and made the environmental permitting process particularly difficult. The agency in charge commissioned a strategic environmental assessment (SEA) of a revamped project, and called it the Rodoanel Programme. However, the SEA report failed to satisfactorily take account of significant strategic issues. Among these, the highway potential effect of inducing urban sprawl over water protection zones is the most critical issue, as it emerged later as a hurdle to project licensing. Conclusion is that, particularly where no agreed-upon framework for SEA exists, when vertical tiering with downstream project EIA is sought, then a careful scoping of strategic issues is more than necessary. If an agreement on 'what is strategic' is not reached and not recognized by influential stakeholders, then the unsettled conflicts will be transferred to project EIA. In such a context, SEA will have added another loop to the usually long road to project approval

  8. Research notes : monitoring water quality along highways.

    Science.gov (United States)

    2006-12-01

    Runoff from highways typically picks up a variety of pollutants from the roadway. These pollutants include sediment, trash, residue from petroleum products, and heavy metals. Depending on the highway and its geographic setting, highway runoff can eva...

  9. An investigation into factors causing delays in highway construction projects in iraq

    Directory of Open Access Journals (Sweden)

    Al Hadithi Bevian I.

    2018-01-01

    Full Text Available The highways sector is a prominent sector in any country’s economy because of its impact on the well-being and safety of its citizens. The transport sector has an impact on social improvement and investment in the nation on the illustration that allows access to markets, production, jobs, health and other social services.This study investigates the causes of delay of highway construction projects in Iraq, which is frequent occurrence. Data was collected using questionnaires which were distributed to the key project participants; contractors, owners and consultants. The data were analyzed using the Frequency index and Spearman‟s rank correlation. The top seven causes of project delays were observed to be political decisions and political realities, the economic crisis of the country, delays in materials test of and obtaining the results, delay in monthly payments of contractor, failure treatment of the delays when implementing the project, the effects of weather, rain and high temperatures, delay in activities during implementation. It is recommended to establish an appropriate number of laboratories and adopt the field laboratory mechanism for the external and remote screens. Owners should give special attention to pay progress payment to contractors on time. The competent contractor who has prior experience in implementing the high projects should be selected. The contractor must take into consideration the weather conditions when preparing the time plan necessary to implement the project. The project management should identify these reasons and deal with them quickly in order to reduce the total delay of the project.

  10. Highway Safety Data : costs, quality, and strategies for improvement : research report

    Science.gov (United States)

    1998-01-01

    The goal of this project was to analyze the collection and management of highway safety data by identifying issues and costs, and proposing means of resolving those issues and reducing the costs. Initial emphasis addressed known elements of the highw...

  11. 78 FR 9771 - Federal Highway Administration

    Science.gov (United States)

    2013-02-11

    ... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Notice of Final Federal Agency Action on Proposed Transportation Project in Illinois and Indiana AGENCY: Federal Highway Administration...., Acting Division Administrator, Federal Highway Administration, 3250 Executive Park Drive, Springfield...

  12. Transportation planning implications of automated/connected vehicles on Texas highways.

    Science.gov (United States)

    2017-04-01

    This research project was focused on the transportation planning implications of automated/connected : vehicles (AV/CVs) on Texas highways. The research assessed how these potentially transformative : technologies can be included in transportation pl...

  13. Projections of highway vehicle population, energy demand, and CO{sub 2} emissions in India through 2040.

    Energy Technology Data Exchange (ETDEWEB)

    Arora, S.; Vyas, A.; Johnson, L.; Energy Systems

    2011-02-22

    This paper presents projections of motor vehicles, oil demand, and carbon dioxide (CO{sub 2}) emissions for India through the year 2040. The populations of highway vehicles and two-wheelers are projected under three different scenarios on the basis of economic growth and average household size in India. The results show that by 2040, the number of highway vehicles in India would be 206-309 million. The oil demand projections for the Indian transportation sector are based on a set of nine scenarios arising out of three vehicle-growth and three fuel-economy scenarios. The combined effects of vehicle-growth and fuel-economy scenarios, together with the change in annual vehicle usage, result in a projected demand in 2040 by the transportation sector in India of 404-719 million metric tons (8.5-15.1 million barrels per day). The corresponding annual CO{sub 2} emissions are projected to be 1.2-2.2 billion metric tons.

  14. Threshold Research on Highway Length under Typical Landscape Patterns Based on Drivers’ Physiological Performance

    Directory of Open Access Journals (Sweden)

    Xia Zhao

    2015-01-01

    Full Text Available The appropriately landscaped highway scenes may not only help improve road safety and comfort but also help protect ecological environment. Yet there is very little research data on highway length threshold with consideration of distinctive landscape patterns. Against this backdrop, the paper aims to quantitatively analyze highway landscape’s effect on driving behavior based on drivers’ physiological performance and quantify highway length thresholds under three typical landscape patterns, namely, “open,” “semiopen,” and “vertical” ones. The statistical analysis was based on data collected in a driving simulator and electrocardiograph. Specifically, vehicle-related data, ECG data, and supplemental subjective stress perception were collected. The study extracted two characteristic indices, lane deviation and LF/HF, and extrapolated the drivers’ U-shaped physiological response to landscape patterns. Models on highway length were built based on LF/HF’s variation trend with highway length. The results revealed that the theoretical highway length threshold tended to increase when the landscape pattern was switched to open, semiopen, and vertical ones. And the reliability and accuracy of the results were validated by questionnaires and field operational tests. Findings from this research will assist practitioners in taking active environmental countermeasures pertaining to different roadside landscape patterns.

  15. The development of an ecological approach to manage the pollution risk from highway runoff.

    Science.gov (United States)

    Crabtree, B; Dempsey, P; Johnson, I; Whitehead, M

    2009-01-01

    In the UK, the Highways Agency is responsible for operating, maintaining and improving the strategic road network in England. One focus of the Highways Agency's ongoing research into the nature and impact of highway runoff is aimed at ensuring that the Highways Agency will meet the requirements of the EU Water Framework Directive. A research programme, undertaken in partnership with the Environment Agency, is in progress to develop a better understanding of pollutants in highway runoff and their ecological impact. The paper presents the outcome of a study to: (1) monitor pollutants in highway runoff under different climate and traffic conditions; (2) develop standards to assess potential ecological risks from soluble pollutants in highway runoff; and (3) develop a model to predict pollutant concentrations in highway runoff. The model has been embedded in a design tool incorporating risk assessment procedures and receiving water standards for soluble and insoluble pollutants--the latter has been developed elsewhere in another project within the research programme. The design tool will be used to support improved guidance on where, and to what level, treatment of runoff is required for highway designers to manage the risk of ecological impact from highway runoff.

  16. Exploration of Drone and Remote Sensing Technologies in Highway Embankment Monitoring and Management (Phase I) : research project capsule.

    Science.gov (United States)

    2017-09-01

    Over time, many Louisiana highway embankments have experienced surface sliding failures, a safety issue causing traffic disruptions. Since no advance-warning system is available for these highway embankment failures, the Louisiana Department of Trans...

  17. Education in Transportation Systems Planning: Highway Research Record No. 462.

    Science.gov (United States)

    National Academy of Sciences - National Research Council, Washington, DC. Transportation Research Board.

    The papers contained in the issue of Highway Research Record focus on current and emerging patterns of education and training related to transportation systems planning. The five papers are: Transportation Centers and Other Mechanisms to Encourage Interdisciplinary Research and Training Efforts in Transportation (Frederick J. Wegmann and Edward A.…

  18. Comprehensive highway corridor planning with sustainability indicators : [research summary].

    Science.gov (United States)

    2013-04-01

    The Maryland State Highway Administration (SHA) has initiated major planning : efforts to improve transportation efficiency, safety and sustainability on critical : highway corridors through its Comprehensive Highway Corridor (CHC) program. : It is i...

  19. The hydrogen highway

    International Nuclear Information System (INIS)

    Grigg, A.

    2004-01-01

    'Full text:' The Hydrogen Highway in British Columbia, Canada, is a coordinated, large-scale demonstration and deployment program aimed at accelerating the commercialization of hydrogen and fuel cell technologies and products. It will be a showcase for fuel cell vehicles, refuelling stations and stationary power systems leading up to the 2010 Olympic and Paralympic Winter Games in Whistler, BC. The Hydrogen Highway is designed to help address many of the challenges to commercialization identified in the Canadian Fuel Cell Commercialization Roadmap. The project will create an early adopter network of hydrogen and fuel cell microenvironments where technology developers and users can learn about the technical, economic, environmental and social impacts of products. The Hydrogen Highway will give the public and potential purchasers an opportunity to feel, touch and see the new technology, as well as provide the industry with a venue in which to develop industry standards and supply chains of materials and components. While demonstration and deployment programs are a recognized and necessary component in the process to commercialize hydrogen and fuel cell technologies, there is no handbook describing how it should be done. This paper will describe the history, objectives, project details and some of the challenges associated with establishing Canada's Hydrogen Highway. (author)

  20. The hydrogen highway

    Energy Technology Data Exchange (ETDEWEB)

    Grigg, A. [Fuel Cells Canada, Vancouver, British Columbia (Canada)

    2004-07-01

    'Full text:' The Hydrogen Highway in British Columbia, Canada, is a coordinated, large-scale demonstration and deployment program aimed at accelerating the commercialization of hydrogen and fuel cell technologies and products. It will be a showcase for fuel cell vehicles, refuelling stations and stationary power systems leading up to the 2010 Olympic and Paralympic Winter Games in Whistler, BC. The Hydrogen Highway is designed to help address many of the challenges to commercialization identified in the Canadian Fuel Cell Commercialization Roadmap. The project will create an early adopter network of hydrogen and fuel cell microenvironments where technology developers and users can learn about the technical, economic, environmental and social impacts of products. The Hydrogen Highway will give the public and potential purchasers an opportunity to feel, touch and see the new technology, as well as provide the industry with a venue in which to develop industry standards and supply chains of materials and components. While demonstration and deployment programs are a recognized and necessary component in the process to commercialize hydrogen and fuel cell technologies, there is no handbook describing how it should be done. This paper will describe the history, objectives, project details and some of the challenges associated with establishing Canada's Hydrogen Highway. (author)

  1. Federal Highway Administration research and technology evaluation final report : Eco-Logical

    Science.gov (United States)

    2018-03-01

    This report documents an evaluation of Federal Highway Administrations (FHWA) Research and Technology Programs activities on the implementation of the Eco-Logical approach by State transportation departments and metropolitan planning organizati...

  2. Integrated prioritization method for active and passive highway-rail crossings.

    Science.gov (United States)

    2013-01-01

    This two-year research project developed a prioritization system for highway-rail at-grade crossings that addressed the following major concerns: (1) warrants to identify low-volume, passive crossings with risk factors; (2) a broader priority index t...

  3. Drug research methodology. Volume 1, The alcohol-highway safety experience and its applicability to other drugs

    Science.gov (United States)

    1980-03-01

    This report presents the findings of a workshop concerning the alcohol and highway safety experience, which includes research efforts to define the drinking-driving problem and societal responses to reduce the increased highway safety risk attributab...

  4. Safety early warning research for highway construction based on case-based reasoning and variable fuzzy sets.

    Science.gov (United States)

    Liu, Yan; Yi, Ting-Hua; Xu, Zhen-Jun

    2013-01-01

    As a high-risk subindustry involved in construction projects, highway construction safety has experienced major developments in the past 20 years, mainly due to the lack of safe early warnings in Chinese construction projects. By combining the current state of early warning technology with the requirements of the State Administration of Work Safety and using case-based reasoning (CBR), this paper expounds on the concept and flow of highway construction safety early warnings based on CBR. The present study provides solutions to three key issues, index selection, accident cause association analysis, and warning degree forecasting implementation, through the use of association rule mining, support vector machine classifiers, and variable fuzzy qualitative and quantitative change criterion modes, which fully cover the needs of safe early warning systems. Using a detailed description of the principles and advantages of each method and by proving the methods' effectiveness and ability to act together in safe early warning applications, effective means and intelligent technology for a safe highway construction early warning system are established.

  5. Safety Early Warning Research for Highway Construction Based on Case-Based Reasoning and Variable Fuzzy Sets

    Directory of Open Access Journals (Sweden)

    Yan Liu

    2013-01-01

    Full Text Available As a high-risk subindustry involved in construction projects, highway construction safety has experienced major developments in the past 20 years, mainly due to the lack of safe early warnings in Chinese construction projects. By combining the current state of early warning technology with the requirements of the State Administration of Work Safety and using case-based reasoning (CBR, this paper expounds on the concept and flow of highway construction safety early warnings based on CBR. The present study provides solutions to three key issues, index selection, accident cause association analysis, and warning degree forecasting implementation, through the use of association rule mining, support vector machine classifiers, and variable fuzzy qualitative and quantitative change criterion modes, which fully cover the needs of safe early warning systems. Using a detailed description of the principles and advantages of each method and by proving the methods’ effectiveness and ability to act together in safe early warning applications, effective means and intelligent technology for a safe highway construction early warning system are established.

  6. Applications of variable speed control for contending with recurrent highway congestion.

    Science.gov (United States)

    2014-07-01

    This research project developed vital operational guidelines for design of a variable speed limit (VSL) system and its integrated operations with ramp metering control in contending with recurrent highway congestion. The developed guidelines can serv...

  7. OML-Highway within the framework of SELMAGIS

    DEFF Research Database (Denmark)

    Jensen, Steen Solvang; Becker, Thomas; Ketzel, Matthias

    This report describes the OML-Highway model and its integration into SELMAGIS. The National Environmental Research Institute (NERI) has developed the OML-Highway model and Ingenieurbüro Lohmeyer from Germany has developed SELMAGIS. The OML-Highway model is able to calculate air pollution concentr...... concentration levels at receptor points along a highway road network, while SELMAGIS is a framework for calculating and representing air pollutant emissions and concentrations in a geographical information system (GIS)......This report describes the OML-Highway model and its integration into SELMAGIS. The National Environmental Research Institute (NERI) has developed the OML-Highway model and Ingenieurbüro Lohmeyer from Germany has developed SELMAGIS. The OML-Highway model is able to calculate air pollution...

  8. Optimize pollutant emissions through adaptive highway management.

    Science.gov (United States)

    2011-09-01

    In this project, we investigated the possibility to reduce green house emission : (mainly CO2) from urban highways by adaptive ramp meter control. QUADSTONE : PARAMICS software was used to build a microscopic traffic model for a 4-lane highway : sect...

  9. 76 FR 1664 - Notice of Final Federal Agency Actions on State Highway 99 (Segment G)

    Science.gov (United States)

    2011-01-11

    ... on State Highway 99 (Segment G) AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of.... 139(l)(1). The actions relate to a proposed highway project, Grand Parkway (State Highway 99) Segment... (State Highway 99) Segment G from I- 45 to US 59 in Harris and Montgomery Counties; FHWA Project...

  10. Bayou Corne Sinkhole: Control Measurements of State Highway 70 in Assumption Parish, Louisiana : Research Project Capsule

    Science.gov (United States)

    2012-09-01

    The sinkhole located in northern Assumption Parish, Louisiana, threatens : the stability of Highway 70, a state-maintained route. In order to monitor : and mitigate potential damage eff ects on this infrastructure, the Louisiana : Department of Trans...

  11. Evaluation and Selection of Renewable Energy Technologies for Highway Maintenance Facilities

    Science.gov (United States)

    Andrews, Taylor

    The interest in renewable energy has been increasing in recent years as attempts to reduce energy costs as well the consumption of fossil fuels are becoming more common. Companies and organizations are recognizing the increasing reliance on limited fossil fuels' resources, and as competition and costs for these resources grow, alternative solutions are becoming more appealing. Many federally run buildings and associations also have the added pressure of meeting the mandates of federal energy policies that dictate specific savings or reductions. Federal highway maintenance facilities run by the Department of Transportation fall into this category. To help meet energy saving goals, an investigation into potential renewable energy technologies was completed for the Ohio Department of Transportation. This research examined several types of renewable energy technologies and the major factors that affect their performance and evaluated their potential for implementation at highway maintenance facilities. Facilities energy usage data were provided, and a facility survey and site visits were completed to enhance the evaluation of technologies and the suitability for specific projects. Findings and technology recommendations were presented in the form of selection matrices, which were designed to help make selections in future projects. The benefits of utilization of other tools such as analysis software and life cycle assessments were also highlighted. These selection tools were designed to be helpful guides when beginning the pursuit of a renewable energy technology for highway maintenance facilities, and can be applied to other similar building types and projects. This document further discusses the research strategies and findings as well as the recommendations that were made to the personnel overseeing Ohio's highway maintenance facilities.

  12. Arrangement of financing for highway infrastructure projects under the conditions of Public–Private Partnership

    Directory of Open Access Journals (Sweden)

    Vialeta Khmel

    2016-03-01

    Full Text Available This study focused on the mechanism of attracting funds to finance projects in the field of highway infrastructure construction through Public–Private Partnership (PPP. The basis and principles for development of the financial strategy of a project company were defined in this paper. The proposed financial strategy was developed on the basis of diversification of sources of funds and financing instruments with regard to the stages of the project life cycle. The parameters for development of the financial strategy were defined to improve the mechanisms of attraction of the capital for the project and increase the capacity of the project company to pay debts. The proposed financial strategy can be taken as a basis for development of the financial strategy for any project implemented through PPP. The capital market is not stable; therefore, in addition, an algorithm was proposed for more precise selection of sources of financial resources.

  13. Flexibility-based damage detection for in-service highway bridge

    Science.gov (United States)

    Dahal, Sushil; Jang, Shinae; Mensah-Bonsu, Priscilla

    2012-04-01

    Highway bridges are the backbones of a country's road network infrastructure. In order to efficiently maintain these important structures, structural health monitoring (SHM) can be implemented to impart a more deterministic management procedure. To date, many damage detection strategies have been developed and implemented on lab-scale or simple bridge structures however, damage detection research has rarely been conducted taking full scale in-service structures into account with ambient vibration. Among the different approaches modal flexibility method is one of the sensitive tools for damage detection which has been widely used over the last two decades. This paper presents a damage detection based on the stochastic damage locating vector (SDLV) method for an in-service highway bridge using ambient vibration data from long-term SHM. The target bridge was equipped with a long-term SHM system as a part of a research project of the University of Connecticut. The ambient vibration data during 2001 and 2005 are used to identify the damage on the highway bridge. Finally, the potential damage locations are determined using the SDLV method with the limited number of sensors.

  14. Engineering Solutions to Enhance Traffic Safety Performance on Two-Lane Highways

    Directory of Open Access Journals (Sweden)

    Lina Wu

    2015-01-01

    Full Text Available Improving two-lane highway traffic safety conditions is of practical importance to the traffic system, which has attracted significant research attention within the last decade. Many cost-effective and proactive solutions such as low-cost treatments and roadway safety monitoring programs have been developed to enhance traffic safety performance under prevailing conditions. This study presents research perspectives achieved from the Highway Safety Enhancement Project (HSEP that assessed safety performance on two-lane highways in Beijing, China. Potential causal factors are identified based on proposed evaluation criteria, and primary countermeasures are developed against inferior driving conditions such as sharp curves, heavy gradients, continuous downgrades, poor sight distance, and poor clear zones. Six cost-effective engineering solutions were specifically implemented to improve two-lane highway safety conditions, including (1 traffic sign replacement, (2 repainting pavement markings, (3 roadside barrier installation, (4 intersection channelization, (5 drainage optimization, and (6 sight distance improvement. The effectiveness of these solutions was examined and evaluated based on Empirical Bayes (EB models. The results indicate that the proposed engineering solutions effectively improved traffic safety performance by significantly reducing crash occurrence risks and crash severities.

  15. 23 CFR 810.102 - Eligible projects.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Eligible projects. 810.102 Section 810.102 Highways... SPECIAL USE HIGHWAY PROJECTS Highway Public Transportation Projects and Special Use Highway Facilities § 810.102 Eligible projects. Under this subpart the Federal Highway Administrator may approve on any...

  16. The green highway forum

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    In late 2004, as part of American Coal Ash Association's (ACAA) strategic planning process, a plan was approved by its Board of Directors implementing a 'green highways' concept which emphasized use of coal combustion products (CCPs) in highways in a variety of ways including being used alone, in combination with other forms of CCPs, and combined with non ash materials. The incentives behind the developed concept were the derived advantages from beneficial technical economic and environmental impacts. Although the primary use of fly ash is concrete, other forms of CCPs could be considered for more non-traditional highway applications. For example, these might include soils stabilization, binders for in-place pavement recycling, use in flowable fills, aggregates, source materials for structural fills and embankments, components in manufactured soils, and for granular base courses beneath pavements. At this same time, unknown to ACCA, EPA Region 3 in Philadelphia was working with the Wetlands and Watershed Work Group, a non-profit organization involved in wetlands policy and management along with the Federal Highway Administration (FHWA) on their own Green Highways initiative. These groups were planning a conference, the 'Green Highway Forum'. This was held in College Park, Maryland at the University of Maryland, Nov 8-10 2005. At the conference a draft 'roadmap' was presented as a guide to executive level participants bringing the diverse viewpoints of many agencies and interest groups together. Ten guiding principals were considered. The 'Green Highways' is a new effort to recognize the 'greenness' of many projects already completed and those to be initiated. 2 photos.

  17. Assessing the costs attributed to project delay during project pre-construction stages.

    Science.gov (United States)

    2016-03-01

    This project for the Texas Department of Transportation (TxDOT) developed a simple but sound : methodology for estimating the cost of delaying most types of highway projects. Researchers considered the : cost of delays during the pre-construction pha...

  18. Bad Foundation and its Treatment of HeBei Coastal Highway | Ye ...

    African Journals Online (AJOL)

    In recent years, with the accelerating urbanization process, the national road network continues to expand, a lot of highway construction projects are in the countryside. The geological properties of high level, long distance highway foundation are complicated. In order to guarantee the stability of highway embankment, we ...

  19. Off-highway vehicle technology roadmap.; TOPICAL

    International Nuclear Information System (INIS)

    NONE

    2002-01-01

    The off-highway sector is under increasing pressure to reduce operating costs (including fuel costs) and to reduce emissions. Recognizing this, the Society of Automotive Engineers and the U.S. Department of Energy (DOE) convened a workshop in April 2001 (ANL 2001) to (1) determine the interest of the off-highway sector (consisting of agriculture, construction, surface mining, inland marine) in crafting a shared vision of off-highway, heavy machines of the future and (2) identify critical research and development (R and D) needs for minimizing off-highway vehicle emissions while cost-effectively maintaining or enhancing system performance. The workshop also enabled government and industry participants to exchange information. During the workshop, it became clear that the challenges facing the heavy, surface-based off-highway sector can be addressed in three major machine categories: (1) engine/aftertreatment and fuels/lubes, (2) machine systems, and (3) thermal management. Working groups convened to address these topical areas. The status of off-highway technologies was determined, critical technical barriers to achieving future emission standards were identified, and strategies and technologies for reducing fuel consumption were discussed. Priority areas for R and D were identified. Given the apparent success of the discussions at the workshop, several participants from industry agreed to help in the formation of a joint industry/government ''roadmap'' team. The U.S. Department of Energy's Office of Heavy Vehicle Technologies has an extensive role in researching ways to make heavy-duty trucks and trains more efficient, with respect to both fuel usage and air emissions. The workshop participants felt that a joint industry/government research program that addresses the unique needs of the off-highway sector would complement the current research program for highway vehicles. With industry expertise, in-kind contributions, and federal government funding (coupled with

  20. Photonic Technologies for Ultra-High-Speed Information Highways

    DEFF Research Database (Denmark)

    Bouchoule, S; Lèfevre, R.; Legros, E.

    1999-01-01

    The ACTS project HIGHWAY (AC067) addresses promising ultra-high speed optoelectronic components and system technologies for 40 Gbit/s time-division-multiplexed (TDM) transport systems. Advanced 40 Gbit/s TDM system lab demonstrators are to be realized and tested over installed field fiber testbeds....... This paper reviews the current status of 40 Gbit/s TDM components and subsystem technologies achieved in HIGHWAY. The results of HIGHWAY 40 Gbit/s TDM systems and field tests will be reported in a subsequent paper. (C) 1999 Academic Press....

  1. Hempcrete Noise Barrier Wall for Highway Noise Insulation : Research & Construction

    OpenAIRE

    KC, Prabesh

    2016-01-01

    The purpose of this thesis was to study the possibility of Hempcrete or hemp-lime composite noise barrier walls in the highways and to construct the walls for the acoustic test according to the European Union Standards EN ISO 717-1 and ISO 10140-2 for air-borne sound insulation. The thesis was commissioned by the company Hemprefine Oy, and all the standard tests were performed in the HAMK-Ruukki Sheet Metal Centre in Hämeenlinna and the VTT Technical Research Centre of Finland Ltd in Espoo. ...

  2. Intelligent Lane Reservation System for Highway(s)

    OpenAIRE

    Dobre, Ciprian

    2012-01-01

    Highways tend to get congested because of the increase in the number of cars travelling on them. There are two solutions to this. The first one, which is also expensive, consists in building new highways to support the traffic. A much cheaper alternative consists in the introduction of advanced intelligent traffic control systems to manage traffic and increase the efficiency of the already existing highways. Intelligent lane reservation system for highways (ILRSH) is such a software control s...

  3. The highway capacity manual a conceptual and research history

    CERN Document Server

    Roess, Roger P

    2014-01-01

    Since 1950, the Highway Capacity Manual has been a standard used in the planning, design, analysis, and operation of virtually any highway traffic facility in the United States. It has also been widely used abroad, and has spurred the development of similar manuals in other countries. The twin concepts of capacity and level of service have been developed in the manual, and methodologies have been presented that allow highway traffic facilities to be designed on a common basis, and allow for the analysis of operational quality under various traffic demand scenarios. The manual also addresses related pedestrian, bicycle, and transit issues.   This book details the fundamental development of the concepts of capacity and level of service, and of the specific methodologies developed to describe them over a wide range of facility types. The book is comprised of two volumes. Volume 1 (this book) focuses on the development of basic principles, and their application to uninterrupted flow facilities: freeways, multila...

  4. 23 CFR 470.107 - Federal-aid highway systems.

    Science.gov (United States)

    2010-04-01

    ... Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH HIGHWAY SYSTEMS... industrial centers, including important routes into, through, and around urban areas, serve the national... importance in Canada and Mexico. (2) The portion of the Interstate System designated under 23 U.S.C. 103 (e...

  5. Research notes : solar powered navigational lighting system demonstration project.

    Science.gov (United States)

    2011-04-01

    ODOT will be installing a solar powered navigational lighting system on the AstoriaMegler Bridge as part of a pilot project approved by the Federal Highways Administration (FHWA). The coastal bridge is the connection across the Columbia River on U.S....

  6. Drug research methodology. Volume 2, The identification of drugs of interest in highway safety

    Science.gov (United States)

    1980-03-01

    This report presents findings of a workshop on the identification of drugs that should be the focus of near-term highway safety research. Drugs of interest are those that have a potential to increase the likelihood of traffic crashes and their attend...

  7. The Application Study in Solar Energy Technology for Highway Service Area: A Case Study of West Lushan Highway Low-Carbon Service Area in China

    OpenAIRE

    Qin, Xiaochun; Shen, Yi; Shao, Shegang

    2015-01-01

    A lot of research works have been made concerning highway service area or solar technology and acquired great achievements. However, unfortunately, few works have been made combining the two topics together of highway service areas and solar energy saving to make a systemic research on solar technology application for highway service area. In this paper, taking West Lushan highway low-carbon service area in Jiangxi Province of China as the case study, the advantages, technical principles, and...

  8. Cornell University remote sensing program. [selected research projects in land and water resource management

    Science.gov (United States)

    Liang, T.; Belcher, D. J.; Mcnair, A. J.

    1974-01-01

    The major activities of the program staff from December 1, 1973 to May 31, 1974 are reported and include: (1) communication and instruction; (2) data and facilities; (3) research completed; (4) research in progress; (5) selected correspondence; (6) grant sponsored travel; and (7) seminars and newsletters. Detailed information and maps are given for the following selected projects: (1) ERTS mapping of waterways in the Tug Hill region of New York State; (2) photo-archeological investigation of Great Gully, New York; and (3) evaluation of selected highway impacts using aerial photography.

  9. 23 CFR 810.302 - Eligible projects.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Eligible projects. 810.302 Section 810.302 Highways... SPECIAL USE HIGHWAY PROJECTS Federal-Aid Urban System Nonhighway Public Mass Transit Projects § 810.302 Eligible projects. (a) Eligible projects are those defined as nonhighway public mass transit projects in...

  10. Modal Identification and Damage Detection on a Concrete Highway Bridge by Frequency Domain Decomposition

    DEFF Research Database (Denmark)

    Brincker, Rune; Andersen, P.; Zhang, L.

    2002-01-01

    As a part of a research project co-founded by the European Community, a series of 15 damage tests were performed on a prestressed concrete highway bridge in Switzerland. The ambient response of the bridge was recorded for each damage case. A dense array of instruments allowed the identification...

  11. Modal Identification and Damage Detection on a Concrete Highway Bridge by Frequency Domain Decomposition

    DEFF Research Database (Denmark)

    Brincker, Rune; Andersen, Palle; Zhang, Lingmi

    2007-01-01

    As a part of a research project co-founded by the European Community, a series of 15 damage tests were performed on a prestressed concrete highway bridge in Switzerland. The ambient response of the bridge was recorded for each damage case. A dense array of instruments allowed the identification...

  12. Accelerated bridge construction utilizing precast pier caps on state highway 69 over Turkey Creek, Huerfano County, CO.

    Science.gov (United States)

    2014-07-01

    The purpose of this report is to document Accelerated Bridge Construction (ABC) techniques on IBRD : (Innovative Bridge Research and Development) project 102470 for the construction of Bridge N-16-Q : on State Highway 69 over Turkey Creek. The constr...

  13. Linking highway improvements to changes in land use with quasi-experimental research design : a better forecasting tool for transportation decision-making.

    Science.gov (United States)

    2009-10-01

    An important issue for future improvement and extensions of highways will be the ability of projects to sustain challenges to Environmental Impact Statements based upon forecasts of regional growth. A legal precedent for such challenges was establish...

  14. OML-Highway within the framework of SELMAGIS. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Solvang Jensen, S.; Becker, T.; Ketzel, M.; Loefstroem, P.; Roerdam Olesen, H. (Aarhus Univ., National Environmental Research Institute, Dept. of Atmospheric Environment (Denmark)); Lorentz, H. (Ingenieurbuero Lohmeyer (Germany))

    2010-06-15

    This report describes the OML-Highway model and its integration into SELMAGIS. The National Environmental Research Institute (NERI) has developed the OML-Highway model and Ingenieurbuero Lohmeyer from Germany has developed SELMAGIS. The OML-Highway model is able to calculate air pollution concentration levels at receptor points along a highway road network, while SELMAGIS is a framework for calculating and representing air pollutant emissions and concentrations in a geographical information system (GIS). (author)

  15. 76 FR 47288 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Science.gov (United States)

    2011-08-04

    ... highway project will be barred unless the claim is filed on or before January 31, 2012. If the Federal law... following highway project in the State of California: The addition of bus rapid transit stations and... actions by the Federal agencies, and the laws under which such actions were taken, are described in the...

  16. Computational Intelligence in Highway Management: A Review

    Directory of Open Access Journals (Sweden)

    Ondrej Pribyl

    2015-10-01

    Full Text Available Highway management systems are used to improve safety and driving comfort on highways by using control strategies and providing information and warnings to drivers. They use several strategies starting from speed and lane management, through incident detection and warning systems, ramp metering, weather information up to, for example, informing drivers about alternative roads. This paper provides a review of the existing approaches to highway management systems, particularly speed harmonization and ramp metering. It is focused only on modern and advanced approaches, such as soft computing, multi-agent methods and their interconnection. Its objective is to provide guidance in the wide field of highway management and to point out the most relevant recent activities which demonstrate that development in the field of highway management is still important and that the existing research exhibits potential for further enhancement.

  17. Module 13: Bulk Packaging Shipments by Highway

    International Nuclear Information System (INIS)

    Przybylski, J.L.

    1994-07-01

    The Hazardous Materials Modular Training Program provides participating United States Department of Energy (DOE) sites with a basic, yet comprehensive, hazardous materials transportation training program for use onsite. This program may be used to assist individual program entities to satisfy the general awareness, safety training, and function specific training requirements addressed in Code of Federal Regulation (CFR), Title 49, Part 172, Subpart H -- ''Training.'' Module 13 -- Bulk Packaging Shipments by Highway is a supplement to the Basic Hazardous Materials Workshop. Module 13 -- Bulk Packaging Shipments by Highway focuses on bulk shipments of hazardous materials by highway mode, which have additional or unique requirements beyond those addressed in the ten module core program. Attendance in this course of instruction should be limited to those individuals with work experience in transporting hazardous materials utilizing bulk packagings and who have completed the Basic Hazardous Materials Workshop or an equivalent. Participants will become familiar with the rules and regulations governing the transportation by highway of hazardous materials in bulk packagings and will demonstrate the application of these requirements through work projects and examination

  18. 23 CFR 710.307 - Project agreement.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Project agreement. 710.307 Section 710.307 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RIGHT-OF-WAY AND ENVIRONMENT RIGHT-OF-WAY AND REAL ESTATE Project Development § 710.307 Project agreement. As a condition of Federal-aid, the STD...

  19. The Application Study in Solar Energy Technology for Highway Service Area: A Case Study of West Lushan Highway Low-Carbon Service Area in China

    Directory of Open Access Journals (Sweden)

    Xiaochun Qin

    2015-01-01

    Full Text Available A lot of research works have been made concerning highway service area or solar technology and acquired great achievements. However, unfortunately, few works have been made combining the two topics together of highway service areas and solar energy saving to make a systemic research on solar technology application for highway service area. In this paper, taking West Lushan highway low-carbon service area in Jiangxi Province of China as the case study, the advantages, technical principles, and application methods of solar energy technology for highway service area including solar photoelectric technology and solar water heating technology were discussed based on the analysis of characteristics of highway low-carbon service area; the system types, operation mode, and installing tilt angle of the two kinds of solar systems suitable for highway service areas were confirmed. It was proved that the reduction of the cost by electricity savings of solar system was huge. Taking the investment of the solar systems into account, the payback period of solar photoelectric systems and solar water heating systems was calculated. The economic effect of the solar systems in West Lushan highway service area during the effective operation periods was also calculated and proved very considerable.

  20. Highway Safety Program Manual: Volume 8: Alcohol in Relation to Highway Safety.

    Science.gov (United States)

    National Highway Traffic Safety Administration (DOT), Washington, DC.

    Volume 8 of the 19-volume Highway Safety Program Manual (which provides guidance to State and local governments on preferred highway safety practices) concentrates on alcohol in relation to highway safety. The purpose and objectives of the alcohol program are outlined. Federal authority in the area of highway safety and general policies regarding…

  1. Spatial Planning for Transit Tourism on The Highway: A Case Study of Highway Е-75 Through Vojvodina (Horgoš – Belgrade Section

    Directory of Open Access Journals (Sweden)

    Vuk GARAČA

    2015-02-01

    Full Text Available The quality and extent of traffc infrastructure has an immense infuence on the development of tourist destinations and on tourism in gener-al. Transit tourism is a unique form of movement and represents a link between generating zones and destinations. The subject of this study is the planning and spatial organization along the route of Highway Е-75 thorough northern Serbian province of Vojvodina. The goal of the study is to scientifcally assert that the route of highway is inadequately equipped as it lacks adequate hospitality services considering its signifcance and the needs of passengers in transit. The pa-per intends to analyze the growing tourists’ de-mands perceived in passenger numbers and the passenger vehicles turnover with existing tourist products.The spatial extent of the research comprises the section of Highway Е-75 through Vojvodina (Horgoš – Subotica – Bačka Topola – Vrbas – Novi Sad – Beška – Indjija – Stara Pazova. The study utilizes mixed quantitative and qual-itative methods, and employs preliminary desk research, feld work, comparative analysis, and a description to establish a critical synthetic narrative. The statistical method of Pearson cor-relation was used for quantitative data analysis and to assess the relationship between overnight stays in places along the highway and the num-ber of passengers travelling the highway. The results of the research pointed out that the initial hypothesis which refers to the lack of specialized accommodation capacity in the highway zone is valid.

  2. Iowa DOT project management peer exchange.

    Science.gov (United States)

    2016-07-01

    This project supported the planning and conduct of a two-day Iowa Department of Transportationhosted peer exchange for state : agencies that have implemented some or all of the suggested strategies outlined in the Second Strategic Highway Research...

  3. The impact of Arizona Highways Magazine's facebook page.

    Science.gov (United States)

    2014-02-01

    This project examined the relationship between use of the Arizona Highways magazine (AHM) Facebook Page and the decision to : travel to or within Arizona. Key purposes were to: (1) provide a thorough understanding of AHM Facebook Page users, includin...

  4. Simulation of physical development because affected by the construction of the highway

    Directory of Open Access Journals (Sweden)

    Damjan Bačnar

    2002-01-01

    Full Text Available The procedure for planning highways entails evaluation of possibilities the purpose being selection of the optimal one. In the procedure certain criteria are applied, amongst other evaluation of influences on regional and urban development. Despite the set criteria the chosen route is often contrary to development goals of cities and wider areas – regions, which it affects. The article presents possibilities of using models of effects of highways on settlement development for forecasting consequences of construction. The model is based on knowledge of effects of already built highways, examples of analysed highway exits are shown with settlement growth. Spatial models are useful tools for forecasting physical changes and simulating effects of projects on physical development or its particular elements.

  5. 23 CFR 140.606 - Project agreements.

    Science.gov (United States)

    2010-04-01

    ... Reimbursement for Bond Issue Projects § 140.606 Project agreements. Project Agreements, Form PR-2, shall be... 23 Highways 1 2010-04-01 2010-04-01 false Project agreements. 140.606 Section 140.606 Highways... projects. 1 The text of FHWA Form PR-2 is found in 23 CFR part 630, subpart C, appendix A. ...

  6. Highway Safety Manual applied in Missouri - freeway/software : research summary.

    Science.gov (United States)

    2016-03-01

    AASHTOs Highway Safety Manual (HSM) : includes models for freeway segments, speedchange : lanes (transitional area between mainline : and ramps), ramps, and interchange terminals. : These predictive models for freeway : interchanges need to be cal...

  7. Highways and habitat: managing habitat connectivity and landscape permeability for wildlife.

    Science.gov (United States)

    Jonathan. Thompson

    2006-01-01

    Millions of miles of highway crisscross the United States . Highways fragment the landscape, affecting the distribution of animal populations and limiting the ability of individuals to disperse between those populations. Moreover, animal-vehicle collisions are a serious hazard to wildlife, not to mention people.Researchers at the PNW Research Station in...

  8. 23 CFR 630.1010 - Significant projects.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Significant projects. 630.1010 Section 630.1010 Highways... PRECONSTRUCTION PROCEDURES Work Zone Safety and Mobility § 630.1010 Significant projects. (a) A significant project is one that, alone or in combination with other concurrent projects nearby is anticipated to cause...

  9. Highway Expenditures and Associated Customer Satisfaction: A Case Study

    Directory of Open Access Journals (Sweden)

    Alexander Paz

    2016-01-01

    Full Text Available This study analyzes the satisfaction of the Nevadans with respect to their highway transportation system and the corresponding expenditures of Nevada Department of Transportation (NDOT. A survey questionnaire was designed to capture the opinions of the Nevadans (customers about a number of characteristics of their transportation system. Data from the financial data warehouse of the NDOT was used to evaluate expenditures. Multinomial probit models were estimated to study the correlations between customers’ opinion and the government expenditures in transportation. The results indicate the customer satisfaction is decreasing with respect to traffic safety throughout Northwestern and Southern Nevada highways. In addition, users of Northwestern highways are more likely to be satisfied, compared to their counterparts, with increasing construction spending to reduce the time taken to complete construction projects. In Southern Nevada highways, customers’ satisfaction increases with the expenditures associated with reduction of congestion. These insights are examples of the conclusions that were obtained as a consequence of simultaneously considering customer satisfaction and the corresponding expenditures in transportation.

  10. Incorporating travel time reliability into the Highway Capacity Manual.

    Science.gov (United States)

    2014-01-01

    This final report documents the activities performed during SHRP 2 Reliability Project L08: Incorporating Travel Time Reliability into the Highway Capacity Manual. It serves as a supplement to the proposed chapters for incorporating travel time relia...

  11. The research on data organization technology in the highway geographic information system

    Science.gov (United States)

    Tian, Zhihui; Wu, Fang; Zeng, Yuhuai

    2008-10-01

    Data are the basis of GIS. It has direct impact on the efficiency and function of a Highway Geographic Information System (HGIS), because of the characteristics of data model and data organization of the traffic geographic information system such as spatial property, multi-path network, linearity. This paper discussed the data property of HGIS, studied and presented the HGIS spatial data on multi-source and model. Also, it described and verified highway geographical feature of special subject data's linearity, dynamic and multiple-path network property in HGIS.

  12. Implementation of GPS controlled highway construction equipment, phase III.

    Science.gov (United States)

    2009-02-01

    Beginning in 2006, WisDOT and the Construction Material and Support Center (CMSC) at UW-Madison worked : together to develop the specifications and the QA/QC procedures for GPS machine guidance on highway grading : projects. These specifications and ...

  13. Examining engineering costs for development of highway projects.

    Science.gov (United States)

    2012-12-01

    The Texas Department of Transportation (TxDOT) commissioned a research team at Texas State University-San Marcos Department of Accounting to analyze the cost of projects by determining the cost of a preliminary engineering hour necessary to develop h...

  14. Radio frequency identification (RFID) tagging for material tracking and future asset management : research project capsule.

    Science.gov (United States)

    2016-07-01

    Current Louisiana Department of Transportation and Development (DOTD) : practice allows multiple mixtures or materials to be submitted and subsequently : used during a highway construction project. Such materials include mechanically : stabilized ear...

  15. Factors influencing seatbelt utilization in Louisiana and strategies to improve usage rate : research project capsule.

    Science.gov (United States)

    2014-09-01

    The overall goal in this research is to reduce fatalities and severe injuries through increasing belt use in : Louisiana. This goal is identi ed in the Louisiana Strategic Highway Safety Plan by the DOTD and the Highway Safety Plan by the LHSC as ...

  16. Norwegian computers in European energy research project

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    16 NORD computers have been ordered for the JET data acquisition and storage system. The computers will be arranged in a 'double star' configuration, developed by CERN. Two control consoles each have their own computer. All computers for communication, control, diagnostics, consoles and testing are NORD-100s while the computer for data storage and analysis is a NORD-500. The operating system is SINTRAN CAMAC SERIAL HIGHWAY with fibre optics to be used for long communications paths. The programming languages FORTRAN, NODAL, NORD PL, PASCAL and BASIC may be used. The JET project and TOKAMAK type machines are briefly described. (JIW)

  17. Environmental suitability of recycled concrete aggregate in highways : [research summary].

    Science.gov (United States)

    2015-01-01

    Natural highway aggregate is a finite resource that with continued use in construction : activities but some good quality aggregates used in existing concrete structures may be : re-used to replace with the natural aggregate. Due to the repair or rep...

  18. 23 CFR 650.703 - Eligible projects.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Eligible projects. 650.703 Section 650.703 Highways..., STRUCTURES, AND HYDRAULICS Discretionary Bridge Candidate Rating Factor § 650.703 Eligible projects. (a..., provided that the total project cost for a discretionary bridge candidate is at least $10 million or twice...

  19. Improved Methodology for Benefit Estimation of Preservation Projects

    Science.gov (United States)

    2018-04-01

    This research report presents an improved process for evaluating the benefits and economic tradeoffs associated with a variety of highway preservation projects. It includes a summary of results from a comprehensive phone survey concerning the use and...

  20. Mechanistic-Empirical (M-E) Design Implementation & Monitoring for Flexible Pavements : 2018 PROJECT SUMMARY

    Science.gov (United States)

    2018-06-01

    This document is a summary of the tasks performed for Project ICT-R27-149-1. Mechanistic-empirical (M-E)based flexible pavement design concepts and procedures were previously developed in Illinois Cooperative Highway Research Program projects IHR-...

  1. 23 CFR 650.405 - Eligible projects.

    Science.gov (United States)

    2010-04-01

    ... FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.405 Eligible projects... rehabilitation. (b) Types of projects which are eligible. The following types of work are eligible for...

  2. A pavement management research program for Oregon highways : interim report.

    Science.gov (United States)

    1985-03-01

    This is the first in a series of reports documenting progress on a statewide pavement management research project. The overall project is conducting research into pavement life cycles of different rehabilitation treatment; the cost-effectiveness of e...

  3. INSAR For Early Warning Of Possible Highway Instability Over Undermined Area Of Ostrava

    Science.gov (United States)

    Lazecky, Milan; Kacmarik, Michal; Rapant, Petr

    2012-01-01

    A part of czech highway D1 connecting Ostrava with Prague and Poland, is built over an undermined area of Ostrava-Svinov. Since the end of 2010, this part of the highway is fully operational. Because of undermining, a subsidence can be expected, however with a very slow rate since the mines are no more active in this area. Several TerraSAR-X images from 2011 are investigated interferometrically in order to estimate a precise deformation model. Subjects of interest are movements of newly built highway bridges, banks and close neighbourhood. Existing C-band multitemporal InSAR processing results of ERS and Envisat are available from an earlier period that reveil a slow trend of residual subsidence. In this project, InSAR will be investigated as a tool for an early warning for highway stability.

  4. Wind-powered electrical systems : highway rest areas, weigh stations, and team section buildings.

    Science.gov (United States)

    2009-02-01

    This project considered the use of wind for providing electrical power at Illinois Department of Transportation : (IDOT) highway rest areas, weigh stations, and team section buildings. The goal of the project was to determine : the extent to which wi...

  5. Solar Highway Program : from concept to reality : a guidebook for Departments of Transportation to develop solar photovoltaic systems in the highway right-of-way.

    Science.gov (United States)

    2016-11-01

    This guidebook is intended to provide an overview for state Departments of Transportation (DOTs) of the process for developing solar photovoltaic (PV) projects in the highway right-of-way. The goal is to help others navigate the process towards a suc...

  6. A visualization method for teaching the geometric design of highways

    Science.gov (United States)

    2000-04-11

    In this project the authors employed state-of-the-art technology for developing visualization tools for teaching highway design. Specifically, the authors used photolog images as the basis for developing dynamic 3-D models of selected geometric eleme...

  7. Tool to manage Road Safety Deficiencies and risk of highway crashes

    Energy Technology Data Exchange (ETDEWEB)

    Lopez Maldonado, G.; Baena Ruiz, L.; Garach Morcillo, L.; Oña Lopez, J. de

    2016-07-01

    In order to facilitate the management of the results obtained in the project “Analysis of the relationship between Road Safety Deficiencies, crashes and hazardous sections” financed by Public Works Agency of the Regional Government of Andalusia (AOPJA) and led by the research group TRYSE from University of Granada, a safety management tool has been developed. This application allows safety managers to consult some factors affecting crashes on two-lane rural highways.The main aim of that project was to analyze the influence of some road deficiencies on crashes and hazardous sections in the Complementary Road Network of Andalusia. These deficiencies were defined in a checklist and were identified by a road inspection. Decision Trees (DTs), that are a data mining technique that allows the extraction of Decision Rules (DRs), were used. DRs revealed the relationship between road deficiencies and crashes.The application allows two different analyses. A specific analysis of the Complementary Road Network of Andalusia, in which, particular safety problems can be identified, and the location of roads with those problems can be obtained. A more general analysis in which some characteristics related to road safety can be selected in order to know the combination of factors contributing to traffic crashes. Safety problems are based on data from Complementary Road Network of Andalusia but results can be extrapolated to other rural highways in Spain. (Author)

  8. Adapting Project Management Practices to Research-Based Projects

    Science.gov (United States)

    Bahr, P.; Baker, T.; Corbin, B.; Keith, L.; Loerch, L.; Mullenax, C.; Myers, R.; Rhodes, B.; Skytland, N.

    2007-01-01

    From dealing with the inherent uncertainties in outcomes of scientific research to the lack of applicability of current NASA Procedural Requirements guidance documentation, research-based projects present challenges that require unique application of classical project management techniques. If additionally challenged by the creation of a new program transitioning from basic to applied research in a technical environment often unfamiliar with the cost and schedule constraints addressed by project management practices, such projects can find themselves struggling throughout their life cycles. Finally, supplying deliverables to a prime vehicle customer, also in the formative stage, adds further complexity to the development and management of research-based projects. The Biomedical Research and Countermeasures Projects Branch at NASA Johnson Space Center encompasses several diverse applied research-based or research-enabling projects within the newly-formed Human Research Program. This presentation will provide a brief overview of the organizational structure and environment in which these projects operate and how the projects coordinate to address and manage technical requirements. We will identify several of the challenges (cost, technical, schedule, and personnel) encountered by projects across the Branch, present case reports of actions taken and techniques implemented to deal with these challenges, and then close the session with an open forum discussion of remaining challenges and potential mitigations.

  9. 76 FR 1663 - Notice of Final Federal Agency Actions on Proposed Highway in North Carolina

    Science.gov (United States)

    2011-01-11

    ..., Bonner Bridge Replacement Project along NC 12, from Rodanthe to Bodie Island in Dare County, North... Bonner Bridge Replacement Project along Highway NC 12, from Rodanthe to Bodie Island, in Dare County...

  10. Highway Electrification And Automation

    OpenAIRE

    Shladover, Steven E.

    1992-01-01

    This report addresses how the California Department of Transportation and the California PATH Program have made efforts to evaluate the feasibility and applicability of highway electrification and automation technologies. In addition to describing how the work was conducted, the report also describes the findings on highway electrification and highway automation, with experimental results, design study results, and a region-wide application impacts study for Los Angeles.

  11. Drug research methodology. Volume 5, Experimentation in drugs and highway safety : the study of drug effects on skills related to driving

    Science.gov (United States)

    1980-06-01

    This report presents the findings of a workshop on experimental research in the area of drugs and highway safety. Complementing studies of drug use in different driving populations, experimentation here refers to studies performed under controlled co...

  12. Determining the drivers' acceptance of EFTCD in highway work zones.

    Science.gov (United States)

    Bai, Yong; Li, Yingfeng

    2011-05-01

    Traffic safety is a major concern in the temporary one-lane, two-way highway work zones due to the increasing of construction and maintenance operations. To prevent rear-end crashes and to mitigate the severity of these crashes caused by the inattentive driving, the utilization of the Emergency Flasher Traffic Control Device (EFTCD) was under consideration by government agencies, in addition to existing temporary traffic control devices installed in the one-lane, two-way highway work zones. The EFTCD was a newly proposed traffic warning device implemented through the use of vehicles' hazard warning flashers. The primary objective of the research project was to investigate the drivers' acceptance of the proposed EFTCD by measuring the mean speed changes of vehicles with and without EFTCD and by evaluating the drivers' opinions of the EFTCD using the survey method. Field experimental results revealed that the EFTCD effectively reduced the mean vehicle speeds in the upstream of two work zones. A slow speed is more likely to reduce the severity of a crash in work zones. In addition, survey results indicated that 60% of the drivers thought the EFTCD signified a need for speed reduction and 82% of drivers recommended the implementation of the EFTCD in one-lane, two-way work zones. These results provide the necessary scientific justifications for the government agencies to decide if the EFTCD should be implemented in the one-lane, two-way highway work zones to prevent rear-end crashes and to mitigate the severity of these crashes. Copyright © 2010 Elsevier Ltd. All rights reserved.

  13. 23 CFR 630.1012 - Project-level procedures.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Project-level procedures. 630.1012 Section 630.1012 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS... agencies/operators, transit providers, freight movers, utility suppliers, police, fire, emergency medical...

  14. Stream instability countermeasures applied at Kansas Department of Transportation highway structures.

    Science.gov (United States)

    2008-11-01

    This project considered stream instability countermeasures used by the Kansas Department of Transportation (KDOT) to protect the highway infrastructure at stream crossings from changes due to the dynamic nature of streams. Site visits were made to 13...

  15. Measuring highway efficiency : A DEA approach and the Malquist index

    NARCIS (Netherlands)

    Sarmento, Joaquim Miranda; Renneboog, Luc; Verga-Matos, Pedro

    A growing concern exists regarding the efficiency of public resources spent in transport infrastructures. In this paper, we measure the efficiency of seven highway projects in Portugal over the past decade by means of a data envelopment analysis and the Malmquist productivity and efficiency indices.

  16. Researchers' experience with project management in health and medical research: Results from a post-project review

    Science.gov (United States)

    2011-01-01

    Background Project management is widely used to deliver projects on time, within budget and of defined quality. However, there is little published information describing its use in managing health and medical research projects. We used project management in the Alcohol and Pregnancy Project (2006-2008) http://www.ichr.uwa.edu.au/alcoholandpregnancy and in this paper report researchers' opinions on project management and whether it made a difference to the project. Methods A national interdisciplinary group of 20 researchers, one of whom was the project manager, formed the Steering Committee for the project. We used project management to ensure project outputs and outcomes were achieved and all aspects of the project were planned, implemented, monitored and controlled. Sixteen of the researchers were asked to complete a self administered questionnaire for a post-project review. Results The project was delivered according to the project protocol within the allocated budget and time frame. Fifteen researchers (93.8%) completed a questionnaire. They reported that project management increased the effectiveness of the project, communication, teamwork, and application of the interdisciplinary group of researchers' expertise. They would recommend this type of project management for future projects. Conclusions Our post-project review showed that researchers comprehensively endorsed project management in the Alcohol and Pregnancy Project and agreed that project management had contributed substantially to the research. In future, we will project manage new projects and conduct post-project reviews. The results will be used to encourage continuous learning and continuous improvement of project management, and provide greater transparency and accountability of health and medical research. The use of project management can benefit both management and scientific outcomes of health and medical research projects. PMID:21635721

  17. Real-time stress monitoring of highway bridges with a secured wireless sensor network.

    Science.gov (United States)

    2011-12-01

    "This collaborative research aims to develop a real-time stress monitoring system for highway bridges with a secured wireless sensor network. The near term goal is to collect wireless sensor data under different traffic patterns from local highway br...

  18. State highways as main streets : a study of community design and visioning.

    Science.gov (United States)

    2009-10-01

    The objectives for this project were to explore community transportation design policy to improve collaboration when state highways serve as local main streets, determine successful approaches to meet the federal requirements for visioning set forth ...

  19. Reliable Freestanding Position-Based Routing in Highway Scenarios

    Science.gov (United States)

    Galaviz-Mosqueda, Gabriel A.; Aquino-Santos, Raúl; Villarreal-Reyes, Salvador; Rivera-Rodríguez, Raúl; Villaseñor-González, Luis; Edwards, Arthur

    2012-01-01

    Vehicular Ad Hoc Networks (VANETs) are considered by car manufacturers and the research community as the enabling technology to radically improve the safety, efficiency and comfort of everyday driving. However, before VANET technology can fulfill all its expected potential, several difficulties must be addressed. One key issue arising when working with VANETs is the complexity of the networking protocols compared to those used by traditional infrastructure networks. Therefore, proper design of the routing strategy becomes a main issue for the effective deployment of VANETs. In this paper, a reliable freestanding position-based routing algorithm (FPBR) for highway scenarios is proposed. For this scenario, several important issues such as the high mobility of vehicles and the propagation conditions may affect the performance of the routing strategy. These constraints have only been partially addressed in previous proposals. In contrast, the design approach used for developing FPBR considered the constraints imposed by a highway scenario and implements mechanisms to overcome them. FPBR performance is compared to one of the leading protocols for highway scenarios. Performance metrics show that FPBR yields similar results when considering freespace propagation conditions, and outperforms the leading protocol when considering a realistic highway path loss model. PMID:23202159

  20. 23 CFR 751.23 - Concurrent junkyard control and right-of-way projects.

    Science.gov (United States)

    2010-04-01

    ...-way projects. The State is encouraged to coordinate junkyard control and highway right-of-way projects. Expenses incurred in furtherance of concurrent projects shall be prorated between projects. ... 23 Highways 1 2010-04-01 2010-04-01 false Concurrent junkyard control and right-of-way projects...

  1. Area Based Models of New Highway Route Growth

    OpenAIRE

    David Levinson; Wei Chen

    2007-01-01

    Empirical data and statistical models are used to answer the question of where new highway routes are most likely to be located. High-quality land-use, population distribution and highway network GIS data for the Twin CitiesMetropolitan Area from 1958 to 1990 are developed for this study. The highway system is classified into three levels, Interstate highways, divided highways, and secondary highways. Binary logit models estimate the new route growth probability of divided highways and second...

  2. 75 FR 18014 - Federal Highway Administration

    Science.gov (United States)

    2010-04-08

    ... DEPARTMENT OF TRANSPORTATION Federal Highway Administration AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of Availability regarding a Finding of No Significant Impact (FONSI): U.S.... FOR FURTHER INFORMATION CONTACT: Federal Highway Administration, Kentucky Division: Mr. Greg Rawlings...

  3. 78 FR 10249 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Science.gov (United States)

    2013-02-13

    ... relate to a proposed highway project on Georgia Street Bridge over University Avenue in the City of San... San Diego and the bridge spans University Avenue. The federal aide project number is BRLO-5004(009... amended. 19. Executive Order 12898, Federal Actions to Address Environmental Justice and Low-Income...

  4. 23 CFR 668.215 - Programming and project procedures.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Programming and project procedures. 668.215 Section 668.215 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS EMERGENCY RELIEF PROGRAM Procedures for Federal Agencies for Federal Roads § 668.215 Programming...

  5. Regional Risk Evaluation of Flood Disasters for the Trunk-Highway in Shaanxi, China

    Directory of Open Access Journals (Sweden)

    Hong-Liang Qi

    2015-10-01

    Full Text Available Due to the complicated environment there are various types of highway disasters in Shaanxi Province (China. The damages caused are severe, losses are heavy, and have rapidly increased over the years, especially those caused by flood disasters along the rivers in mountainous areas. Therefore, research on risk evaluations, which play important roles in the prevention and mitigation of highway disasters are very important. An evaluation model was established based on the superposition theory of regional influencing factors to highway flood disasters. Based on the formation mechanism and influencing factors of highway flood disasters, the main influencing factors were selected. These factors include rainstorms, terrain slopes, soil types, vegetation coverage and regional river density, which are based on evaluation indexes from climate conditions and underlying surface of the basin. A regional risk evaluation of highway flood disasters in Shaanxi was established using GIS. The risk index was divided into five levels using statistical methods, in accordance with the regional characteristics of highway flood disasters. Considering the difference in upfront investments, road grade, etc, between expressways and trunk-highways in China, a regional risk evaluation of trunk-highway flood disasters was completed. The evaluation results indicate that the risk evaluation is consistent with the actual situation.

  6. Regional Risk Evaluation of Flood Disasters for the Trunk-Highway in Shaanxi, China.

    Science.gov (United States)

    Qi, Hong-Liang; Tian, Wei-Ping; Li, Jia-Chun

    2015-10-29

    Due to the complicated environment there are various types of highway disasters in Shaanxi Province (China). The damages caused are severe, losses are heavy, and have rapidly increased over the years, especially those caused by flood disasters along the rivers in mountainous areas. Therefore, research on risk evaluations, which play important roles in the prevention and mitigation of highway disasters are very important. An evaluation model was established based on the superposition theory of regional influencing factors to highway flood disasters. Based on the formation mechanism and influencing factors of highway flood disasters, the main influencing factors were selected. These factors include rainstorms, terrain slopes, soil types, vegetation coverage and regional river density, which are based on evaluation indexes from climate conditions and underlying surface of the basin. A regional risk evaluation of highway flood disasters in Shaanxi was established using GIS. The risk index was divided into five levels using statistical methods, in accordance with the regional characteristics of highway flood disasters. Considering the difference in upfront investments, road grade, etc, between expressways and trunk-highways in China, a regional risk evaluation of trunk-highway flood disasters was completed. The evaluation results indicate that the risk evaluation is consistent with the actual situation.

  7. Highway project cost estimating and management.

    Science.gov (United States)

    2009-02-01

    "This report provides detailed information about the project objectives, deliverables, and findings. The project team : thoroughly reviewed the Montana Department of Transportation (MDT) structure, operations, and current procedures as : related to M...

  8. 75 FR 1114 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Science.gov (United States)

    2010-01-08

    ... improve the safety of State Route 16 between the town of Brooks and Interstate 505 in Yolo County by... relate to a proposed highway project, State Route 16 between the town of Brooks and Interstate 505 in the County Yolo, State of California. Those actions grant licenses, permits, and approvals for the project...

  9. Economic development and workforce impacts of state DOT highway expenditures.

    Science.gov (United States)

    2014-01-01

    The research measured the impact of Georgia Department of Transportations highway : expenditures on economic activity in the State. The analysis covered awards made between January 2009 : and April 2013. The research is unique in that it not only ...

  10. Comprehensive highway corridor planning with sustainability indicators.

    Science.gov (United States)

    2011-10-01

    "The Maryland State Highway Administration (SHA) has initiated major planning efforts to improve transportation : efficiency, safety, and sustainability on critical highway corridors through its Comprehensive Highway Corridor : (CHC) program. This pr...

  11. Bayou Corne sinkhole : control measurements of State Highway 70 in Assumption Parish, Louisiana.

    Science.gov (United States)

    2014-01-01

    This project measured and assessed the surface stability of the portion of LA Highway 70 that is : potentially vulnerable to the Assumption Parish sinkhole. Using Global Positioning Systems (GPS) : enhanced by a real-time network (RTN) of continuousl...

  12. National Highway Traffic Safety Administration 1995 customer satisfaction survey

    Science.gov (United States)

    1996-05-01

    The National Highway Traffic Safety Administration (NHTSA) conducted a national Customer Satisfaction Survey in response to the requirements of the National Performance Review and Executive Order 12862. An independent research organization, Schulman,...

  13. National register of research projects

    Energy Technology Data Exchange (ETDEWEB)

    1985-03-01

    This Register is intended to serve as a source of information on research which is being conducted in all fields (both natural and human sciences) in the Republic of South Africa. New research projects commenced during 1983 or 1984, and significantly changed research projects, as well as project that were completed or terminated during this period, on which information was received by the compilers before December 1984, are included, with the exception of confidential projects.

  14. DOT Official County Highway Map

    Data.gov (United States)

    Minnesota Department of Natural Resources — The County Highway Map theme is a scanned and rectified version of the original MnDOT County Highway Map Series. The cultural features on some of these maps may be...

  15. International Contribution to the Highway Agency's Bridge Related Research

    DEFF Research Database (Denmark)

    Nowak, A. S.; Thoft-Christensen, Palle

    and prediction of the remaining life. However, the parameters, which are involved in the evaluation process, are random variable. Therefore, a considerable research effort has been directed at the development of probability-based methodology. The research projects considered in the paper include the development...... of reliability models for analysis of bridges subjected to corrosion and fatigue, and reliability-based optimization of maintenance strategies for bridges....

  16. National Highway Traffic Safety Administration : 1997 customer satisfaction survey

    Science.gov (United States)

    1998-03-13

    In 1995, the National Highway Traffic Safety Administration (NHTSA) conducted its first Customer Satisfaction Survey in response to the requirements of the National Performance Review and Executive Order 12862. An independent research organization, S...

  17. Missouri Highway Safety Manual Recalibration

    Science.gov (United States)

    2018-05-01

    The Highway Safety Manual (HSM) is a national manual for analyzing the highway safety of various facilities, including rural roads, urban arterials, freeways, and intersections. The HSM was first published in 2010, and a 2014 supplement addressed fre...

  18. Updating and improving methodology for prioritizing highway project locations on the strategic intermodal system (SIS).

    Science.gov (United States)

    2016-04-01

    The Florida Department of Transportation (FDOT) District One developed the Congestion Management Process : (CMP) system to prioritize low-cost, near-term highway improvements on the Strategic Intermodal System (SIS). : The existing CMP system is desi...

  19. Impact of highway construction on water bodies: a geospatial assessment.

    Science.gov (United States)

    Vijay, Ritesh; Kushwaha, Vikash K; Mardikar, Trupti; Labhasetwar, P K

    2017-08-01

    India has witnessed a massive infrastructure boom in the past few years. One of such projects is National Highway-7 (NH-7), a North-South highway connecting Kanyakumari, Tamil Nadu, to Varanasi, Uttar Pradesh, traversing many water bodies. The present study aims to assess the pre- and post-construction impact due to existing, new and widened NH-7 on the physical status of the water bodies, using remote sensing techniques. Satellite images spanning 22 years were procured and analysed for change detection in land use and land cover within the waterbodies. The study indicates that construction activities have led to transformation within the water bodies regarding reduction in area and inter-changing of land use and land cover classes, in turn leading to siltation and reduction of recharge.

  20. 75 FR 18095 - America's Marine Highway Program

    Science.gov (United States)

    2010-04-09

    ... Marine Highway Transportation. Authority: Energy Independence and Security Act of 2007, Sections 1121...] RIN 2133-AB70 America's Marine Highway Program AGENCY: Maritime Administration, Department of... interim final rule that established America's Marine Highway Program, under which the Secretary will...

  1. State Maintained Highways in Louisiana, UTM Zone 15 NAD83, LDOTD (2007) [state_highways_ldotd_2007

    Data.gov (United States)

    Louisiana Geographic Information Center — This dataset represents the state maintained road network of Louisiana. The dataset includes Interstates, US highways, and Louisiana State Highways. This dataset was...

  2. Drug research methodology. Volume 4, Epidemiology in drugs and highway safety : the study of drug use among drivers and its role in traffic crashes

    Science.gov (United States)

    1980-06-01

    This report presents the findings of a workshop on epidemiology in drugs and highway safety. A cross-disciplinary panel of experts (1) identified methodological issues and constraints present in research to define the nature and magnitude of the drug...

  3. Student Research Projects

    Science.gov (United States)

    Yeske, Lanny A.

    1998-01-01

    Numerous FY1998 student research projects were sponsored by the Mississippi State University Center for Air Sea Technology. This technical note describes these projects which include research on: (1) Graphical User Interfaces, (2) Master Environmental Library, (3) Database Management Systems, (4) Naval Interactive Data Analysis System, (5) Relocatable Modeling Environment, (6) Tidal Models, (7) Book Inventories, (8) System Analysis, (9) World Wide Web Development, (10) Virtual Data Warehouse, (11) Enterprise Information Explorer, (12) Equipment Inventories, (13) COADS, and (14) JavaScript Technology.

  4. Project management of life-science research projects: project characteristics, challenges and training needs.

    Science.gov (United States)

    Beukers, Margot W

    2011-02-01

    Thirty-four project managers of life-science research projects were interviewed to investigate the characteristics of their projects, the challenges they faced and their training requirements. A set of ten discriminating parameters were identified based on four project categories: contract research, development, discovery and call-based projects--projects set up to address research questions defined in a call for proposals. The major challenges these project managers are faced with relate to project members, leadership without authority and a lack of commitment from the respective organization. Two-thirds of the project managers indicated that they would be interested in receiving additional training, mostly on people-oriented, soft skills. The training programs that are currently on offer, however, do not meet their needs. Copyright © 2010 Elsevier Ltd. All rights reserved.

  5. Recent Research and Application Activities on Structural Health ...

    African Journals Online (AJOL)

    ... newly constructed bridges, (2) research and development activities on smart sensors such as optical fiber sensors and piezo-electric sensors, (3) structural damage detection methods using measured data, and (4) a test road project for pavement design verification and enhancement by the Korea Highway Corporation.

  6. Experimental Plasma Research project summaries

    International Nuclear Information System (INIS)

    1980-09-01

    This report contains descriptions of the activities supported by the Experimental Plasma Research Branch of APP. The individual project summaries were prepared by the principal investigators and include objectives and milestones for each project. The projects are arranged in six research categories: Plasma Properties; Plasma Heating; Plasma Diagnostics; Atomic, Molecular and Nuclear Physics; Advanced Superconducting Materials; and the Fusion Plasma Research Facility (FPRF). Each category is introduced with a statement of objectives and recent progress and followed by descriptions of individual projects. An overall budget summary is provided at the beginning of the report

  7. Experimental Plasma Research project summaries

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-09-01

    This report contains descriptions of the activities supported by the Experimental Plasma Research Branch of APP. The individual project summaries were prepared by the principal investigators and include objectives and milestones for each project. The projects are arranged in six research categories: Plasma Properties; Plasma Heating; Plasma Diagnostics; Atomic, Molecular and Nuclear Physics; Advanced Superconducting Materials; and the Fusion Plasma Research Facility (FPRF). Each category is introduced with a statement of objectives and recent progress and followed by descriptions of individual projects. An overall budget summary is provided at the beginning of the report.

  8. Highway Performance Monitoring System (HPMS) (National)

    Data.gov (United States)

    Department of Transportation — The Federal Highway Administration (FHWA) has the responsibility to assure that adequate highway transportation information is available to support its functions and...

  9. Off-Highway Gasoline Consuption Estimation Models Used in the Federal Highway Administration Attribution Process: 2008 Updates

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, Ho-Ling [ORNL; Davis, Stacy Cagle [ORNL

    2009-12-01

    This report is designed to document the analysis process and estimation models currently used by the Federal Highway Administration (FHWA) to estimate the off-highway gasoline consumption and public sector fuel consumption. An overview of the entire FHWA attribution process is provided along with specifics related to the latest update (2008) on the Off-Highway Gasoline Use Model and the Public Use of Gasoline Model. The Off-Highway Gasoline Use Model is made up of five individual modules, one for each of the off-highway categories: agricultural, industrial and commercial, construction, aviation, and marine. This 2008 update of the off-highway models was the second major update (the first model update was conducted during 2002-2003) after they were originally developed in mid-1990. The agricultural model methodology, specifically, underwent a significant revision because of changes in data availability since 2003. Some revision to the model was necessary due to removal of certain data elements used in the original estimation method. The revised agricultural model also made use of some newly available information, published by the data source agency in recent years. The other model methodologies were not drastically changed, though many data elements were updated to improve the accuracy of these models. Note that components in the Public Use of Gasoline Model were not updated in 2008. A major challenge in updating estimation methods applied by the public-use model is that they would have to rely on significant new data collection efforts. In addition, due to resource limitation, several components of the models (both off-highway and public-us models) that utilized regression modeling approaches were not recalibrated under the 2008 study. An investigation of the Environmental Protection Agency's NONROAD2005 model was also carried out under the 2008 model update. Results generated from the NONROAD2005 model were analyzed, examined, and compared, to the extent that

  10. Experimental plasma research project summaries

    International Nuclear Information System (INIS)

    1978-08-01

    This report contans descriptions of the activities supported by the Experimental Plasma Research Branch of APP. The individual project summaries were prepared by the principal investigators and include objectives and milestones for each project. The projects are arranged in six research categories: Plasma Properties; Plasma Heating; Plasma Measurements and Instrumentation; Atomic, Molecular and Nuclear Physics; Advanced Superconducting Materials; and the Fusion Plasma Research Facility (FPRF). Each category is introduced with a statement of objectives and recent progress and followed by descriptions of individual projects. An overall budget summary is provided at the beginning of the report

  11. STUK research projects 1998-2000

    International Nuclear Information System (INIS)

    Salomaa, S.; Eloranta, E.; Heimbuerger, H.; Jokela, K.; Jaervinen, H.

    1998-07-01

    The primary goal of STUK, the Finnish Radiation and Nuclear Safety Authority, is to prevent and limit the harmful effects of radiation. The research conducted by STUK yields new information related to the use, occurrence and effects of radiation and promotes the supervision of nuclear safety. STUK research projects 1998 - 2000 summarizes STUK's own research projects and commissioned research designed to promote the supervision of nuclear safety. Information on the research projects and related publications is also available on STUK's WWW pages at www.stuk.fi. The work done on the safe use of nuclear power and nuclear waste management mainly comprises commissioned research projects which derive from the needs of authorities, and are funded and directed by STUK. This research is conducted by organizations outside STUK, but supervised by STUK experts. In some cases, STUK personnel are also involved. The goal of this research work is to produce the information needed for decision-making, to develop supervisory methods and to ensure that recent developments in science and technology are taken into account in action to promote safe use of nuclear power. STUK's own research focuses on radiation protection and the health effects of radiation. During 1998 - 2000, the main emphasis will be on projects supporting the Finnish national environmental health action plan, the health risks of radiation, emergency preparedness and cooperation with neighbouring CEE areas. EU directives on radiation protection and medical exposure to radiation also influence the course taken by research carried out at STUK. STUK's research activities are now more international than ever; the institute is involved in more then 20 research projects funded by EU. Apart from the EU and the Nordic countries, STUK's main partners are to be found in Russia, Estonia and the USA. (orig.)

  12. Geometric Design of Highways in USA

    Directory of Open Access Journals (Sweden)

    Hrvoje Baričević

    2012-10-01

    Full Text Available This paper describes the criteria, standards, and engineeringprocedures used to design principal elements of the highwayalignment, highway cross sections, and adjacent roadside environment.Development of a comprehensive highway design focuseson the establishment of travel lane configuration, alignmentlocation, and all dimensions related to the highway crosssection. A three-dimensional physical location is determinedthrough calculation of a horizontal and vertical alignment ofthe highway centerline, based on a variety of operational considerations.The results of these activities are refe"ed to as thegeometric design and represent all the visible features of a highwayor street. The first and major portion of the paper deals withthe design of motor-vehicle facilities. Specific design elementsare described and discussed with respect to design methodology.

  13. Major Highway Lines, US, 2015, NAVTEQ

    Data.gov (United States)

    U.S. Environmental Protection Agency — NAVTEQ Major Highways for the United States. The Major Highways layer contains Road Network features based on the Functional Class attribute value on each link...

  14. Secondary Highway Lines, US, 2015, NAVTEQ

    Data.gov (United States)

    U.S. Environmental Protection Agency — NAVTEQ Secondary Highways for the United States. The Secondary Highways layer contains Road Network features based on the Functional Class value on each link present...

  15. Research of influence of time of reaction of the driver on the calculation of the capacity of the highway

    Directory of Open Access Journals (Sweden)

    Anastasiya SHEVTSOVA

    2015-09-01

    Full Text Available In the work we performed a review of studies of foreign scholars on changing the reaction time of the driver depending on various road conditions, namely the change in the response time when using the traffic light regulation. Earlier by the authors of this article have already been carried out research in the field of throughput of a site of a highway with traffic regulation, which showed that this value depends on the time of reaction of the driver. In this article the estimation of how much bandwidth the highway using different result obtained in the course of analysis, time value of reaction of the driver and is a direct correlation bandwidth from the time of reaction of the driver. The values obtained allow to conclude that taking into account the psycho-physiological characteristics of drivers (response time will have a significant impact on the throughput and the various methods of organization and reorganization of sections of the road network, implementation of which is used investigated the amount of bandwidth.

  16. Management of research and development project

    International Nuclear Information System (INIS)

    Go, Seok Hwa; Hong Jeong Yu; Hyun, Byeong Hwan

    2010-12-01

    This book introduces summary on management of research and development project, prepare of research and development with investigation and analysis of paper, patent and trend of technology, structure of project, management model, management of project, management of project range, management of project time, management of project cost, management of project goods, management of project manpower, management of communication, management of project risk, management of project supply, management of outcome of R and D, management of apply and enroll of patent and management of technology transfer.

  17. Remote sensing in Michigan for land resource management: Highway impact assessment

    Science.gov (United States)

    1972-01-01

    An existing section of M-14 freeway constructed in 1964 and a potential extension from Ann Arbor to Plymouth, Michigan provided an opportunity for investigating the potential uses of remote sensing techniques in providing projective information needed for assessing the impact of highway construction. Remote sensing data included multispectral scanner imagery and aerial photography. Only minor effects on vegetation, soils, and land use were found to have occurred in the existing corridor. Adverse changes expected to take place in the corridor proposed for extension of the freeway can be minimized by proper design of drainage ditches and attention to good construction practices. Remote sensing can be used to collect and present many types of data useful for highway impact assessment on land use, vegetation categories and species, soil properties and hydrologic characteristics.

  18. Fuzzy Evaluation of Highway Project Financing Risks Based on Entropy%基于熵权的高速公路项目融资风险模糊评价

    Institute of Scientific and Technical Information of China (English)

    黄琼; 杨玉宝

    2015-01-01

    This paper combines fuzzy analytic hierarchy process(FAHP)with entropy weight method to evaluate the highway project financing risks.The combination is objective and reasonable,which enables a comprehensive evaluation of the level of project financing risks for rational investment decisions in advance.Firstly,the risks are divided into two levels which are of 7 first -class indexes and 31 second -class indexes through the practical ex-perience of highway project financing risks both in domestic and foreign countries,then the risk level is divided into five levels.FAHP is used to assess highway project financing risks,and entropy weight method to determine the weight of each index.This combination of subjective and objective methods enhances the reasonableness of the evaluation.Western Yunnan Roads Development Project is then selected as a case to elaborate the using of FAHP and entropy weight method in expressway project financing risk assessment.%本文选取模糊层次分析法和熵权法结合来评价高速公路项目融资风险,该评价方法既客观又合理,能够在事前对项目融资的风险高低做出综合评价以进行合理的投资决策。我们首先通过综合国内外高速公路项目融资实践中遇到的普遍风险,将风险划分为两个层次共7个一级指标和31个二级指标,并将风险等级划分为五个级别,选取模糊层次分析法对高速公路项目融资风险做出评价,中间采用熵权法来确定各级指标权重,将主观与客观相结合,增强评价的合理性。同时选择云南西部道路发展项目作为案例进行分析,更加清晰地阐述了模糊层次分析法和熵权法在高速公路项目融资风险评价中的运用。

  19. An economic analysis methodology for project evaluation and programming.

    Science.gov (United States)

    2013-08-01

    Economic analysis is a critical component of a comprehensive project or program evaluation methodology that considers all key : quantitative and qualitative impacts of highway investments. It allows highway agencies to identify, quantify, and value t...

  20. Coordinated research projects (CRP). Coordinated research project (CRP)

    International Nuclear Information System (INIS)

    Takagi, Hidekazu; Koike, Fumihiro; Nakamura, Nobuyuki

    2013-01-01

    In the present paper, the contribution of Japanese scientists in coordinated research projects on thermonuclear fusion. Representative subjects taken in seven projects are the precise computation of theoretical data on electron-molecule collisions in the peripheral plasma, the computation of spectroscopic data of multi-charged tungsten ions, the spectroscopic measurement of multi-charged tungsten ions using an ion trap device, the development of collisional-radiative model for plasmas including hydrogen and helium, the computational and theoretical studies on the behavior of tungsten and beryllium in the plasma-wall interaction, the study on the property of dusts generated in fusion devices. These subjects are those of most important issues in ITER. (author)

  1. Updating a Strategic Highway Safety Plan : Learning from the Idaho Transportation Department (ITD) - Proceedings from the Federal Highway Administration's (FHWA) Highway Safety Peer-to-Peer Exchange Program

    Science.gov (United States)

    2009-10-01

    On November 4, 2009, ITDs Office of Highway Operations and Safety partnered with the FHWA Office of Safety to host a one-day peer exchange. This event focused on the update of Idahos Strategic Highway Safety Plan (SHSP), entitled Toward Zero...

  2. Solar Market Research and Analysis Projects | Solar Research | NREL

    Science.gov (United States)

    Market Research and Analysis Projects Solar Market Research and Analysis Projects Solar market research and analysis efforts at NREL seek to further solar technologies' role in supporting a more . Midscale Commercial Market Solar Analysis NREL experts are providing analysis to expand the midscale solar

  3. Citizen, Science, Highways, and Wildlife: Using a Web-based GIS to Engage Citizens in Collecting Wildlife Information

    Directory of Open Access Journals (Sweden)

    Tracy Lee

    2006-06-01

    Full Text Available Road Watch in the Pass is a citizen-science project that engages local citizens in reporting wildlife observations along a 44-km stretch of Highway 3 through Crowsnest Pass in southwestern Alberta, Canada. The numbers of wildlife vehicle collisions and a recent proposal to expand the highway have raised concerns from both human safety and wildlife conservation perspectives. Through the use of a web-based GIS, interested citizens can contribute information that will be instrumental in making final decisions concerning measures to mitigate the effects of highway expansion. Currently, 58 people have contributed over 713 observations to Road Watch. We performed a preliminary comparison of 11 months of Road Watch observations and wildlife mortality data for the same time period to demonstrate that the use of citizen science not only augments more conventional approaches, but also results in the emergence of new knowledge and insights. A Kappa index of agreement of 14% indicates poor agreement between the data sets, highlighting that wildlife successfully cross the highway in areas not identified by the wildlife mortality data. This has important implications for design and mitigation efforts for Highway 3 and other roadways.

  4. AHP-based spatial analysis of water quality impact assessment due to change in vehicular traffic caused by highway broadening in Sikkim Himalaya

    Science.gov (United States)

    Banerjee, Polash; Ghose, Mrinal Kanti; Pradhan, Ratika

    2018-05-01

    Spatial analysis of water quality impact assessment of highway projects in mountainous areas remains largely unexplored. A methodology is presented here for Spatial Water Quality Impact Assessment (SWQIA) due to highway-broadening-induced vehicular traffic change in the East district of Sikkim. Pollution load of the highway runoff was estimated using an Average Annual Daily Traffic-Based Empirical model in combination with mass balance model to predict pollution in the rivers within the study area. Spatial interpolation and overlay analysis were used for impact mapping. Analytic Hierarchy Process-Based Water Quality Status Index was used to prepare a composite impact map. Model validation criteria, cross-validation criteria, and spatial explicit sensitivity analysis show that the SWQIA model is robust. The study shows that vehicular traffic is a significant contributor to water pollution in the study area. The model is catering specifically to impact analysis of the concerned project. It can be an aid for decision support system for the project stakeholders. The applicability of SWQIA model needs to be explored and validated in the context of a larger set of water quality parameters and project scenarios at a greater spatial scale.

  5. assessment of traffic flow on enugu highways using speed density

    African Journals Online (AJOL)

    HOD

    Corresponding author, tel: +234 – 806 – 435 – 0200 ... construction, maintenance and optimization of the highways using the ...... Research Part A: Policy and Practice 29(4), 273-281. 1995. ... relationships: Quality and Theory of Traffic Flow.

  6. How can innovative project delivery systems improve the overall efficiency of GDOT in transportation project delivery?

    Science.gov (United States)

    2013-04-01

    The USDOT and Federal Highway Administration (FHWA) recommend the smart use of innovative project : delivery systems, such as design-build, to improve efficiency and effectiveness of developing transportation : projects. Although design-build provide...

  7. Short-term impacts of a 4-lane highway on black bears in eastern North Carolina

    Science.gov (United States)

    Van Manen, Frank T.; McCollister, Matthew F.; Nicholson, Jeremy M.; Thompson, Laura M.; Kindall, Jason L.; Jones, Mark D.

    2012-01-01

    Among numerous anthropogenic impacts on terrestrial landscapes, expanding transportation networks represent one of the primary challenges to wildlife conservation worldwide. Larger mammals may be particularly vulnerable because of typically low densities, low reproductive rates, and extensive movements. Although numerous studies have been conducted to document impacts of road networks on wildlife, inference has been limited because of experimental design limitations. During the last decade, the North Carolina Department of Transportation (NCDOT) rerouted and upgraded sections of United States Highway 64 between Raleigh and the Outer Banks to a 4-lane, divided highway. A new route was selected for a 24.1-km section in Washington County. The new section of highway included 3 wildlife underpasses with adjacent wildlife fencing to mitigate the effects of the highway on wildlife, particularly American black bears (Ursus americanus). We assessed the short-term impacts of the new highway on spatial ecology, population size, survival, occupancy, and gene flow of black bears. We tested our research hypotheses using a before-after control-impact (BACI) study design. We collected data during 2000–2001 (preconstruction phase) and 2006–2007 (postconstruction phase) in the highway project area and a nearby control area (each approx. 11,000 ha), resulting in 4 groups of data (i.e., pre- or postconstruction study phase, treatment or control area). We captured and radiocollared 57 bears and collected 5,775 hourly locations and 4,998 daily locations. Using mixed-model analysis of variance and logistic regression, we detected no differences in home ranges, movement characteristics, proximity to the highway alignment, or habitat use between the 2 study phases, although minimum detectable effect sizes were large for several tests. However, after completion of the new highway, bears on the treatment area became less inactive in morning, when highway traffic was low, compared with

  8. Technical and economic viability of automated highway systems : preliminary analysis

    Science.gov (United States)

    1997-01-01

    Technical and economic investigations of automated highway systems (AHS) are addressed. It has generally been accepted that such systems show potential to alleviate urban traffic congestion, so most of the AHS research has been focused instead on tec...

  9. BR-319: Brazil's Manaus-Porto Velho highway and the potential impact of linking the arc of deforestation to central amazonia.

    Science.gov (United States)

    Fearnside, Philip M; de Alencastro Graça, Paulo Maurício Lima

    2006-11-01

    Brazil's BR-319 Highway linked Manaus, in the state of Amazonas, to Porto Velho, Rondônia, until it became impassable in 1988. Now it is proposed for reconstruction and paving, which would facilitate migration from the "Arc of Deforestation" in the southern part of the Amazon region to new frontiers farther north. The purpose of the highway, which is to facilitate transport to São Paulo of products from factories in the Manaus Free Trade Zone, would be better served by sending the containers by ship to the port of Santos. The lack of a land connection to Manaus currently represents a significant barrier to migration to central and northern Amazonia. Discourse regarding the highway systematically overestimates the highway's benefits and underestimates its impacts. A variety of changes would be needed prior to paving the highway if these potential impacts are to be attenuated. These include zoning, reserve creation, and increased governance in various forms, including deforestation licensing and control programs. More fundamental changes are also needed, especially the abandonment of the long-standing tradition in Brazil of granting squatters' rights to those who invade public land. Organizing Amazonian occupation in such a way that road construction and improvement cease to lead to explosive and uncontrolled deforestation should be a prerequisite for approval of the BR-319 and other road projects for which major impacts are expected. These projects could provide the impetus that is needed to achieve the transition away from appropriation of public land by both small squatters and by grileiros (large-scale illegal claimants). A delay in reconstructing the highway is advisable until appropriate changes can be effected.

  10. Nationwide desert highway assessment: a case study in China.

    Science.gov (United States)

    Mao, Xuesong; Wang, Fuchun; Wang, Binggang

    2011-07-01

    The natural environment affects the construction of desert highways. Conversely, highway construction affects the natural environment and puts the ecological environment at a disadvantage. To satisfy the variety and hierarchy of desert highway construction and discover the spatio-temporal distribution of the natural environment and its effect on highway construction engineering, an assessment of the natural regional divisions of desert highways in China is carried out for the first time. Based on the general principles and method for the natural region division, the principles, method and index system for desert highway assessment is put forward by combining the desert highway construction features and the azonal differentiation law. The index system combines the dominant indicator and four auxiliary indicators. The dominant indicator is defined by the desert's comprehensive state index and the auxiliary indicators include the sand dune height, the blown sand strength, the vegetation coverage ratio and the annual average temperature difference. First the region is divided according to the dominant indicator. Then the region boundaries are amended according to the four auxiliary indicators. Finally the natural region division map for desert highway assessment is presented. The Chinese desert highways can be divided into three sections: the east medium effect region, the middle medium-severe effect region, and the west slight-medium effect region. The natural region division map effectively paves the way for the route planning, design, construction, maintenance and ongoing management of desert highways, and further helps environmental protection.

  11. Sustainable Waste Management for Green Highway Initiatives

    Directory of Open Access Journals (Sweden)

    Husin Nur Illiana

    2016-01-01

    Full Text Available Green highway initiative is the transportation corridors based on sustainable concept of roadway. It incorporates both transportation functionality and ecological requirements. Green highway also provides more sustainable construction technique that maximizes the lifespan of highway. Waste management is one of the sustainable criterias in the elements of green highway. Construction of highway consumes enormous amounts of waste in term of materials and energy. These wastes need to be reduce to sustain the environment. This paper aims to identify the types of waste produced from highway construction. Additionally, this study also determine the waste minimization strategy and waste management practiced.. This study main focus are construction and demolition waste only. The methodology process begin with data collection by using questionnaire survey. 22 concession companies listed under Lembaga Lebuhraya Malaysia acted as a respondent. The questionnaires were distributed to all technical department staffs. The data received was analyzed using IBM SPSS. The results shows the most production of waste is wood, soil, tree root and concrete. The least production of waste is metal. For waste minimization, the best waste minimization is reuse for all type of waste except for tree root and stump. Whereas, the best waste management is providing strategic plan. The least practice for waste management is recording the quantity of waste.

  12. 23 CFR 660.112 - Project development.

    Science.gov (United States)

    2010-04-01

    ... PROGRAMS (DIRECT FEDERAL) Forest Highways § 660.112 Project development. (a) Projects to be administered by... Program. Projects to be administered by a cooperator shall be developed in accordance with Federal-aid procedures and procedures documented in the statewide agreement. (b) The FH projects shall be designed in...

  13. Trend and concentrations of legacy lead (Pb) in highway runoff

    International Nuclear Information System (INIS)

    Kayhanian, Masoud

    2012-01-01

    This study presents the results of lead (Pb) concentrations from both highway runoff and contaminated soil along 32 and 23 highway sites, respectively. In general, the Pb concentration on topsoil (0–15 cm) along highways was much higher than the Pb concentration in subsurface soil (15–60 cm). The Pb deposited on soil appears to be anthropogenic and a strong correlation was found between the Pb concentration in surface soil and highway runoff in urban areas. The concentration of Pb measured during 1980s from highways runoff throughout the world was up to 11 times higher than the measured values in mid 1990s and 2000s. The current Pb deposited on soil near highways appears to be a mixture of paint, tire weight balance and old leaded gasoline combustion. Overall, the Pb phase-out regulation reduced the Pb deposits in the environment and consequently lowered Pb loading into receiving waters. - Highlights: ► Pb concentrations in highway runoff ranged from 0.5 to 752 mg/L. ► 78% of total lead concentration in highway runoff was in particulate form. ► Pb deposited on highway sites was mostly within 0 to 15 cm of soil column. ► Pb concentration in highway runoff and top soil was strongly correlated. ► Current Pb concentration in highway runoff is up to 11 times lower than late 1980s. - Most Pb deposited on soil near highways is within the top 15 cm. This Pb is the major sources of Pb concentration in highway runoff that has substantially been reduced since lead phase-out era.

  14. Research Planning and Evaluation Project

    International Nuclear Information System (INIS)

    Song, Seunghyun; Kim, Doyang; Ryu, Byunghoon; Lim, Chaeyoung; Song, Leeyoung; Lee, Youngchul; Han, Changsun; Kim, Hackchoon

    2011-12-01

    - To activate R and D through a systematic and impartial evaluation by using information on efficient distribution of research resource, setting project priorities, and measuring achievement against goals produced after research on planning and evaluation system for the government-funded project for KAERI was conducted. - Nuclear R and D project is the representative national R and D project which has been implemented in Korea. For the sustainable development of nuclear energy which supplies about 40% of total electricity generation and the enhancement of it innovative ability in the future, a systematic and efficient strategy in the planning stage is required

  15. Highway Safety Program Manual: Volume 3: Motorcycle Safety.

    Science.gov (United States)

    National Highway Traffic Safety Administration (DOT), Washington, DC.

    Volume 3 of the 19-volume Highway Safety Program Manual (which provides guidance to State and local governments on preferred highway safety practices) concentrates on aspects of motorcycle safety. The purpose and specific objectives of a State motorcycle safety program are outlined. Federal authority in the highway safety area and general policies…

  16. Highway extraction from high resolution aerial photography using a geometric active contour model

    Science.gov (United States)

    Niu, Xutong

    Highway extraction and vehicle detection are two of the most important steps in traffic-flow analysis from multi-frame aerial photographs. The traditional method of deriving traffic flow trajectories relies on manual vehicle counting from a sequence of aerial photographs, which is tedious and time-consuming. This research presents a new framework for semi-automatic highway extraction. The basis of the new framework is an improved geometric active contour (GAC) model. This novel model seeks to minimize an objective function that transforms a problem of propagation of regular curves into an optimization problem. The implementation of curve propagation is based on level set theory. By using an implicit representation of a two-dimensional curve, a level set approach can be used to deal with topological changes naturally, and the output is unaffected by different initial positions of the curve. However, the original GAC model, on which the new model is based, only incorporates boundary information into the curve propagation process. An error-producing phenomenon called leakage is inevitable wherever there is an uncertain weak edge. In this research, region-based information is added as a constraint into the original GAC model, thereby, giving this proposed method the ability of integrating both boundary and region-based information during the curve propagation. Adding the region-based constraint eliminates the leakage problem. This dissertation applies the proposed augmented GAC model to the problem of highway extraction from high-resolution aerial photography. First, an optimized stopping criterion is designed and used in the implementation of the GAC model. It effectively saves processing time and computations. Second, a seed point propagation framework is designed and implemented. This framework incorporates highway extraction, tracking, and linking into one procedure. A seed point is usually placed at an end node of highway segments close to the boundary of the

  17. Research projects of STUK 2000-2002

    International Nuclear Information System (INIS)

    Salomaa, S.

    2000-06-01

    The primary goal of STUK, the Finnish Radiation and Nuclear Safety Authority, is to prevent and limit the harmful effects of radiation. The research conducted by STUK yields new information related to the use, occurrence and effects of radiation. STUK research projects 2000 - 2002 summarises STUK's own research activities on radiation protection. In addition to these, STUK also supervises and funds research projects related to safety of nuclear energy and nuclear waste and materials that are carried out in other research institutes. Information on the research projects and related publications is also available on STUK's WWW pages at www.stuk.fi. STUK's research focuses on radiation protection and the health effects of radiation. During 2000 - 2002, the main emphasis will be on projects supporting the Finnish national environmental health action plan, the health risks of radiation, emergency preparedness and cooperation with neighbouring CEE areas. EU directives on radiation protection and medical exposure to radiation also influence the course taken by research carried out at STUK. New research priorities also include studies on non-ionising radiation, especially the effects of mobile phone frequency radiation. STUK's research activities are now more international than ever; the institute is involved in about 20 research projects funded by EC. Apart from the European Union and the Nordic countries, STUK's main partners are to be found in Russia, Estonia and the USA. (author)

  18. Trends in the highway market for wood products

    Science.gov (United States)

    Robert G. Knutson

    1975-01-01

    Forty-eight million cubic feet of wood products, about 50 million dollars worth, were used in the Nation's highway construction program in 1972. Expenditures for highway construction increased 2½ times from 1954 to 1972. The volume of wood products used in highway construction changed little during this period because other materials were substituted for...

  19. Quality of stormwater runoff discharged from Massachusetts highways, 2005-07

    Science.gov (United States)

    Smith, Kirk P.; Granato, Gregory E.

    2010-01-01

    The U.S. Geological Survey (USGS), in cooperation with U.S. Department of Transportation Federal Highway Administration and the Massachusetts Department of Transportation, conducted a field study from September 2005 through September 2007 to characterize the quality of highway runoff for a wide range of constituents. The highways studied had annual average daily traffic (AADT) volumes from about 3,000 to more than 190,000 vehicles per day. Highway-monitoring stations were installed at 12 locations in Massachusetts on 8 highways. The 12 monitoring stations were subdivided into 4 primary, 4 secondary, and 4 test stations. Each site contained a 100-percent impervious drainage area that included two or more catch basins sharing a common outflow pipe. Paired primary and secondary stations were located within a few miles of each other on a limited-access section of the same highway. Most of the data were collected at the primary and secondary stations, which were located on four principal highways (Route 119, Route 2, Interstate 495, and Interstate 95). The secondary stations were operated simultaneously with the primary stations for at least a year. Data from the four test stations (Route 8, Interstate 195, Interstate 190, and Interstate 93) were used to determine the transferability of the data collected from the principal highways to other highways characterized by different construction techniques, land use, and geography. Automatic-monitoring techniques were used to collect composite samples of highway runoff and make continuous measurements of several physical characteristics. Flowweighted samples of highway runoff were collected automatically during approximately 140 rain and mixed rain, sleet, and snowstorms. These samples were analyzed for physical characteristics and concentrations of 6 dissolved major ions, total nutrients, 8 total-recoverable metals, suspended sediment, and 85 semivolatile organic compounds (SVOCs), which include priority polyaromatic

  20. Using Social Media for Research Dissemination: The Digital Research Video Project

    Directory of Open Access Journals (Sweden)

    Suzanne Pilaar Birch

    2013-09-01

    Full Text Available This article discusses the outcomes of the Digital Research Video Project, which was part of the larger Social Media Knowledge Exchange program at the Centre for Research in the Arts, Social Sciences, and Humanities (CRASSH at the University of Cambridge and funded by the Arts & Humanities Research Council (UK. The project was founded on the premise that open access publication of research, while important, does not necessarily make research accessible. Often, PhD students and post-doctoral scholars lack the skills needed to communicate their research to a broader audience. The goal of the project was, first, to provide communication training to early career researchers (achieved through a workshop held in autumn 2012 and second, to create illustrated videos highlighting projects by early career researchers that would help them engage with their work using multimedia and share their results with a larger audience. This article considers the methods of dissemination and impact of the project.

  1. Research projects of STUK 2000-2002

    Energy Technology Data Exchange (ETDEWEB)

    Salomaa, S. [ed.

    2000-06-01

    The primary goal of STUK, the Finnish Radiation and Nuclear Safety Authority, is to prevent and limit the harmful effects of radiation. The research conducted by STUK yields new information related to the use, occurrence and effects of radiation. STUK research projects 2000 - 2002 summarises STUK's own research activities on radiation protection. In addition to these, STUK also supervises and funds research projects related to safety of nuclear energy and nuclear waste and materials that are carried out in other research institutes. Information on the research projects and related publications is also available on STUK's WWW pages at www.stuk.fi. STUK's research focuses on radiation protection and the health effects of radiation. During 2000 - 2002, the main emphasis will be on projects supporting the Finnish national environmental health action plan, the health risks of radiation, emergency preparedness and cooperation with neighbouring CEE areas. EU directives on radiation protection and medical exposure to radiation also influence the course taken by research carried out at STUK. New research priorities also include studies on non-ionising radiation, especially the effects of mobile phone frequency radiation. STUK's research activities are now more international than ever; the institute is involved in about 20 research projects funded by EC. Apart from the European Union and the Nordic countries, STUK's main partners are to be found in Russia, Estonia and the USA. (author)

  2. Forecast the Impact of Bucharest – Braşov Highway on the Economic and Functional Structure of Human Settlements in Ilfov County

    Directory of Open Access Journals (Sweden)

    PETRONELA NOVĂCESCU

    2011-01-01

    Full Text Available One of the most publicized issues concerning the infrastructure of Romania is the Bucharest-Braşov highway. The long-awaited project aims to streamline the traffic between the Capital and the central part of the country, representing the central area of the Pan - European Road Corridor IV. The length of the highway on the territory of Ilfov County is 31 km, representing 17% of the total length of Bucharest- Braşov highway. The start of the highway will have strong effects on economic structure and on the way the Bucharest Metropolitan Area will work. We can expect an increase in the disparities between the settlements of Ilfov County. This pattern is also observable on the Bucharest-Ploieşti corridor where, in recent years, much of the Ilfov county's economic activities have migrated to the north, especially along that corridor. Besides economic migration, intense residential migration followed the Bucharest – Ploieşti corridor, residents of the Bucharest itself moving out to the north of Ilfov County. Probably, the future Bucharest – Braşov highway will lead to an increased suburbanization and periurbanization, this in turn giving way to the crowding of the area by businesses eager to have access to the highway. This project will likely increase the gap between north and south of Ilfov County. In addition to changes that may occur at the county level, changes will also have an impact on the localities themselves since the areas located near the highway will have an economic and demographic growth rate superior to more remote areas. In this sense, we conducted a comparative analysis between eight settlements of Ilfov county crossed by the Bucharest-Braşov highway in order to assess the impact. This analysis was based on the information obtained from site and statistical indicators that were processed to obtain a clear picture of the situation in the examined territory.

  3. Geothermal Reservoir Technology Research Program: Abstracts of selected research projects

    Energy Technology Data Exchange (ETDEWEB)

    Reed, M.J. (ed.)

    1993-03-01

    Research projects are described in the following areas: geothermal exploration, mapping reservoir properties and reservoir monitoring, and well testing, simulation, and predicting reservoir performance. The objectives, technical approach, and project status of each project are presented. The background, research results, and future plans for each project are discussed. The names, addresses, and telephone and telefax numbers are given for the DOE program manager and the principal investigators. (MHR)

  4. Characteristics of the event mean concentration (EMC) from rainfall runoff on an urban highway

    International Nuclear Information System (INIS)

    Lee, Ju Young; Kim, Hyoungjun; Kim, Youngjin; Han, Moo Young

    2011-01-01

    The purpose of this study was to investigate the characterization of the event mean concentration (EMC) of runoff during heavy precipitation events on highways. Highway runoff quality data were collected from the 7th highway, in South Korea during 2007-2009. The samples were analyzed for runoff quantity and quality parameters such as COD cr , TSS, TPHs, TKN, NO 3 , TP, PO 4 and six heavy metals, e.g., As, Cu, Cd, Ni, Pb and Zn. Analysis of resulting hydrographs and pollutant graphs indicates that the peak of the pollutant concentrations in runoff occurs 20 min after the first rainfall runoff occurrence. The first flush effect depends on the preceding dry period and the rainfall intensity. The results of this study can be used as a reference for water quality management of urban highways. - Research highlights: → Field test on urban highway were performed to 50 of 100 storm events for 3 years. → The peak pollutant concentrations occurs 20 min after the first runoff. → The first flush effect depends on the preceding dry period and rainfall intensity. → Relationship between runoff and event mean concentration for SS and COD. → A crest of the EMC by 70-80 m 3 /event and decreasing EMC after 70-80 m 3 /event. - This study investigate the characterization of the EMC of runoff during rainfall event on highway.

  5. Research projects of STUK 2003-2005

    International Nuclear Information System (INIS)

    Salomaa, S.

    2004-01-01

    The primary goal of STUK, Finnish Radiation and Nuclear Safety Authority, is to protect man, society, environment and future generations from the harmful effects of radiation. The research conducted by STUK yields new information related to the use, occurrence and effects of radiation. STUK research projects 2003 - 2005 summarizes STUK's own research activities on radiation protection. In addition to these, STUK also supervises and funds research projects related to safety of nuclear energy, and nuclear waste and materials that are carried out in other research institutes. Information on the research projects and related publications is also available on STUK's WWW pages at www.stuk.fi. STUK's research focuses on radiation protection and health effects of radiation. During 2003 - 2005 the main emphasis will be on research supporting the Finnish national environmental health action plan, and projects concerning the health risks of radiation, nuclear emergency preparedness and protection of biota. EU directives on radiation protection and medical radiation exposure also influence the course taken by the research carried out at STUK. New research priorities also include studies on non-ionising radiation, especially the effects of mobile phone frequency radiation. STUK's research networks involve well over 100 national and international partners. During 2003 - 2005 STUK is actively participating in the 6th framework research programmes of EC

  6. Soft Budgets And Highway Franchising

    OpenAIRE

    Eduardo Engel; Ronald Fischer; Alexander Galetovic

    2004-01-01

    Latin American governments progressively substituted build–operate–and–transfer (BOT) contracts for government–provided highways during the nineties. Because under BOT a private franchise holder finances and operates the road in exchange for tolls, it is often claimed that BOT represents a privatization of highways. We argue that, as currently applied, the BOT model is an imperfect and incomplete privatization, because the franchise holders’ budget constraint has been soft, with losses being ...

  7. Trends in federal and state highway investment

    Science.gov (United States)

    2003-06-18

    In response to Congressional request the U.S. General Accounting Office (GAO) reviewed data from Federal Highway Administration 's Highway Statistics for the period from 1982 through 2001, adjusting expenditures to 2001 dollars to (1) identify overal...

  8. HIGHWAY, a transportation routing model: program description and users' manual

    International Nuclear Information System (INIS)

    Joy, D.S.; Johnson, P.E.; Gibson, S.M.

    1982-12-01

    A computerized transportation routing model has been developed at the Oak Ridge National Laboratory to be used for predicting likely routes for shipping radioactive materials. The HIGHWAY data base is a computerized road atlas containing descriptions of the entire interstate highway system, the federal highway system, and most of the principal state roads. In addition to its prediction of the most likely commercial route, options incorporated in the HIGHWAY model can allow for maximum use of interstate highways or routes that will bypass urbanized areas containing populations > 100,000. The user may also interactively modify the data base to predict routes that bypass any particular state, city, town, or specific highway segment

  9. Explaining residential moving intentions : the case of highway locations

    NARCIS (Netherlands)

    Hamersma, Marije; Heinen, Eva; Tillema, Taede; Arts, Jos

    2013-01-01

    In this paper Structural Equation Modeling is used to test a theoretical framework to explain the impact of highway externalities (i.e. accessibility and nuisance) on moving intentions of people living close to highways. We aimed to study whether highway externalities (alongside other contextual

  10. Canada's gas taxes = highway robbery

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-05-01

    This report was prepared for the second annual 'gas honesty day' (May 18, 2000) in an effort to draw attention to the frustration of Canadian taxpayers with gasoline retailers and the petroleum industry for the inordinately and unjustifiably high prices for gasoline at the pump. The report points out that the public outcry is, in fact, misdirected since the largest profiteers at the pumps, the federal government, remains largely unscathed. It is alleged in the report that gas taxes are tantamount to highway robbery. Ostensibly collected for road construction and maintenance, of the almost $ 5 billion collected in 1999, only a paltry $ 194 million was returned to the provinces for roadway and highway spending. The 10-year average of federal returns to the the provinces from tax on gasoline is a meager 4.7 per cent, which fell even further to 4.1 per cent in 1998-1999. Gasoline tax revenues continue to climb, while government commitment to real roadway and highway spending continues to decline. This document attempts to shed some light on the pricing structure for gasoline. Without defending or explaining the non-tax portion of the pump price charged by Canada's oil companies, which is a task for the oil companies to undertake, the document makes a concerted effort to raise public awareness and focus public attention on government's involvement, namely that gas taxes represent on average about 50 per cent of the pump price and that the majority of the taxes collected are not put back into road and highway improvements. The Canadian Taxpayers Federation, authors of this report, expect that by focusing debate on the issue of gasoline taxes a broad support for a lowering of the overall tax burden on motorists will result. Among other things, the CTF advocates reduction of federal and provincial fuel taxes to levels commensurate with highway funding; dedication of fuel tax revenues to highway construction and maintenance; elimination of the sales and goods

  11. The ELETTRA field highway system

    International Nuclear Information System (INIS)

    Bulfone, D.; Michelini, P.; Mignacco, M.

    1992-01-01

    ELETTRA is a third generation Synchrotron Light Source under construction in Trieste (Italy); it consists of a full energy linac injector and a storage ring with beam energies between 1.5 and 2 GeV. The ELETTRA control system has a distributed architecture, hierarchically divided into three layers of computers; two network levels provide communication between the adjacent computer layers. The field highway adopted for the connection of the middle-layer local process computers with the bottom-layer equipment interface units is the MIL-1553B multidrop highway. This paper describes the hardware configuration and the main communication services developed on the MIL-1553B field highway for accelerator control. As an additional feature, typical LAN utilities have been added on top of the basic MIL-1553B communication software allowing remote logic and file transfer; these tools are currently used for software development in our laboratory. (author)

  12. PLANNING OF ROUTE OF ROUNDABOUT HIGHWAYS TAKING INTO ACCOUNT THE ECONOMY OF FINANCIAL AND POWER RESOURCES

    Directory of Open Access Journals (Sweden)

    Ye. Ugnenko

    2010-01-01

    Full Text Available Taking into account the perspective intensity of motion of transit transport and project rate of movement pursuant to recommendations in relation to the rational placing of geometrical elements of the route the parameters of the route of roundabout highways are determined.

  13. Research Project Evaluation-Learnings from the PATHWAYS Project Experience.

    Science.gov (United States)

    Galas, Aleksander; Pilat, Aleksandra; Leonardi, Matilde; Tobiasz-Adamczyk, Beata

    2018-05-25

    Every research project faces challenges regarding how to achieve its goals in a timely and effective manner. The purpose of this paper is to present a project evaluation methodology gathered during the implementation of the Participation to Healthy Workplaces and Inclusive Strategies in the Work Sector (the EU PATHWAYS Project). The PATHWAYS project involved multiple countries and multi-cultural aspects of re/integrating chronically ill patients into labor markets in different countries. This paper describes key project's evaluation issues including: (1) purposes, (2) advisability, (3) tools, (4) implementation, and (5) possible benefits and presents the advantages of a continuous monitoring. Project evaluation tool to assess structure and resources, process, management and communication, achievements, and outcomes. The project used a mixed evaluation approach and included Strengths (S), Weaknesses (W), Opportunities (O), and Threats (SWOT) analysis. A methodology for longitudinal EU projects' evaluation is described. The evaluation process allowed to highlight strengths and weaknesses and highlighted good coordination and communication between project partners as well as some key issues such as: the need for a shared glossary covering areas investigated by the project, problematic issues related to the involvement of stakeholders from outside the project, and issues with timing. Numerical SWOT analysis showed improvement in project performance over time. The proportion of participating project partners in the evaluation varied from 100% to 83.3%. There is a need for the implementation of a structured evaluation process in multidisciplinary projects involving different stakeholders in diverse socio-environmental and political conditions. Based on the PATHWAYS experience, a clear monitoring methodology is suggested as essential in every multidisciplinary research projects.

  14. SafetyAnalyst : software tools for safety management of specific highway sites

    Science.gov (United States)

    2010-07-01

    SafetyAnalyst provides a set of software tools for use by state and local highway agencies for highway safety management. SafetyAnalyst can be used by highway agencies to improve their programming of site-specific highway safety improvements. SafetyA...

  15. Experimental plasma research project summaries

    International Nuclear Information System (INIS)

    1982-10-01

    The experimental plasma Research Branch has responsibility for developing a broad range of experimental data and new experimental techniques that are required for operating and interpreting present large-scale confinement experiments, and for designing future deuterium-tritium burining facilities. The Branch pursued these objectives by supporting research in DOE laboratories, other Federal laboratories, other Federal laboratories, universities, and private industry. Initiation and renewal of research projects are primarily through submission of unsolicited proposals by these institutions to DOE. Summaries of these projects are given

  16. 78 FR 6845 - Notice of Final Federal Agency Actions on Proposed Interchange Project in Massachusetts

    Science.gov (United States)

    2013-01-31

    ..., Cambridge, MA 02142, Monday through Friday 8:00 a.m.-4:30 p.m., 617-494-2419, [email protected]dot.gov . For the Massachusetts Department of Transportation Highway Division (MassDOT): Ms. Mary Hynes, Project Manager... on Proposed Interchange Project in Massachusetts AGENCY: Federal Highway Administration (FHWA), DOT...

  17. 20% Research & Design Science Project

    Science.gov (United States)

    Spear, Beth A.

    2015-04-01

    A project allowing employees to use 15 % of their time on independent projects was established at 3M in the 1950's. The result of this project included products like post it notes and masking tape. Google allows its employees to use 20% of their time on independently pursued projects. The company values creativity and innovation. Employees are allowed to explore projects of interest to them one day out of the week, 20 % of their work week. Products like AdSense, Gmail, Google Transit, Google News, and Google Talk are the result of this 20 % program. My school is implementing the Next Generation Science Standards (NGSS) as part of our regularly scheduled curriculum review. These new standards focus on the process of learning by doing and designing. The NGSS are very hands on and active. The new standards emphasize learning how to define, understand and solve problems in science and technology. In today's society everyone needs to be familiar with science and technology. This project allows students to develop and practice skills to help them be more comfortable and confident with science and technology while exploring something of interest to them. This project includes three major parts: research, design, and presentation. Students will spend approximately 2-4 weeks defining a project proposal and educating themselves by researching a science and technology topic that is of interest to them. In the next phase, 2-4 weeks, students design a product or plan to collect data for something related to their topic. The time spent on research and design will be dependant on the topic students select. Projects should be ambitious enough to encompass about six weeks. Lastly a presentation or demonstration incorporating the research and design of the project is created, peer reviewed and presented to the class. There are some problems anticipated or already experienced with this project. It is difficult for all students to choose a unique topic when you have large class sizes

  18. An O-"fish"-ial Research Project

    Science.gov (United States)

    Newman, James; Krustchinsky, Rick; Vanek, Karen; Nguyen, Kim-Thoa

    2009-01-01

    In this "O-"fish"-ial" research project, third-grade students use multiple resources to research several fish species, write a research paper and develop a PowerPoint presentation to communicate their findings. In addition, students actually examine these species up close with samples from the local market, and then conclude the project with a…

  19. [The research project: financing and management].

    Science.gov (United States)

    Schena, F P

    2003-01-01

    Basic and clinical research is accomplished by projects. The design of a project is not only based on the scientific content but also on its financing and management. This article wants to illustrate the correct modalities for project financing and project management in a scientific project.

  20. Wireless monitoring of highways

    Science.gov (United States)

    Bennett, Richard; Hayes-Gill, Barrie; Crowe, John A.; Armitage, Robert; Rodgers, Dale; Hendroff, Adrian

    1999-05-01

    Electronic hardware has been developed to telemetrically transmit temperature and strain measurements from within a public highway in the UK. These measurements provide an important health check for monitoring fatigue damage in pavements. Previous attempts at measuring strain and temperature have required lengths of cable to be installed in the highway. The installation of these cables is both expensive and damaging to the pavement and provides potentially unreliable electrical connections. The new systems consist of a retrofitted instrumented asphalt core which is bonded into the pavement structure. The core contains all the electronics necessary to record two temperatures and two strains. An analogue front end provides signal conditioning which is digitized and passed to microcontroller for endcoding. From there the data is transmitted via a low power radio link to a receiver and data logger positioned by the side of the road. The system has an in-situ operating life of 6 months on AA alkaline batteries. Results are presented of power management and fault tolerant radio protocol techniques, long term temperature variations, dynamic strain measurements within the highway, and RF transmission capabilities through a layer of asphalt.

  1. Technology Base Research Project for electrochemical energy storage

    Science.gov (United States)

    Kinoshita, K.

    1985-06-01

    The DOE Electrochemical Energy Storage Program is divided into two projects: (1) the exploratory technology development and testing (ETD) project and (2) the technology base research (TBR) project. The role of the TBR Project is to perform supporting research for the advanced battery systems under development by the ETD Project, and to evaluate new systems with potentially superior performance, durability and/or cost characteristics. The specific goal of the TBR Project is to identify the most promising electrochemical technologies and transfer them to industry and/or the ETD Project for further development and scale-up. This report summarizes the research, financial, and management activities relevant to the TBR Project in CY 1984. General problem areas addressed by the project include identification of new electrochemical couples for advanced batteries, determination of technical feasibility of the new couples, improvements in battery components and materials, establishment of engineering principles applicable to electrochemical energy storage and conversion, and the assessment of fuel-cell technology for transportation applications. Major emphasis is given to applied research which will lead to superior performance and lower life-cycle costs. The TBR Project is divided into three major project elements: exploratory research, applied science research, and air systems research.

  2. Research Project Evaluation—Learnings from the PATHWAYS Project Experience

    Directory of Open Access Journals (Sweden)

    Aleksander Galas

    2018-05-01

    Full Text Available Background: Every research project faces challenges regarding how to achieve its goals in a timely and effective manner. The purpose of this paper is to present a project evaluation methodology gathered during the implementation of the Participation to Healthy Workplaces and Inclusive Strategies in the Work Sector (the EU PATHWAYS Project. The PATHWAYS project involved multiple countries and multi-cultural aspects of re/integrating chronically ill patients into labor markets in different countries. This paper describes key project’s evaluation issues including: (1 purposes, (2 advisability, (3 tools, (4 implementation, and (5 possible benefits and presents the advantages of a continuous monitoring. Methods: Project evaluation tool to assess structure and resources, process, management and communication, achievements, and outcomes. The project used a mixed evaluation approach and included Strengths (S, Weaknesses (W, Opportunities (O, and Threats (SWOT analysis. Results: A methodology for longitudinal EU projects’ evaluation is described. The evaluation process allowed to highlight strengths and weaknesses and highlighted good coordination and communication between project partners as well as some key issues such as: the need for a shared glossary covering areas investigated by the project, problematic issues related to the involvement of stakeholders from outside the project, and issues with timing. Numerical SWOT analysis showed improvement in project performance over time. The proportion of participating project partners in the evaluation varied from 100% to 83.3%. Conclusions: There is a need for the implementation of a structured evaluation process in multidisciplinary projects involving different stakeholders in diverse socio-environmental and political conditions. Based on the PATHWAYS experience, a clear monitoring methodology is suggested as essential in every multidisciplinary research projects.

  3. 26 CFR 48.6427-0 - Off-highway business use.

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 16 2010-04-01 2010-04-01 true Off-highway business use. 48.6427-0 Section 48... Special Application to Retailers and Manufacturers Taxes § 48.6427-0 Off-highway business use. For purposes of the regulations under section 6427, after March 31, 1983, the term “off-highway business use...

  4. 26 CFR 48.6421-0 - Off-highway business use.

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 16 2010-04-01 2010-04-01 true Off-highway business use. 48.6421-0 Section 48... Special Application to Retailers and Manufacturers Taxes § 48.6421-0 Off-highway business use. For purposes of the regulations under section 6421, after March 31, 1983, the term “off-highway business use...

  5. 30 CFR 402.10 - Research-project applications.

    Science.gov (United States)

    2010-07-01

    ... project title, project objectives, background information, research tasks, methodology to conduct the... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Research-project applications. 402.10 Section... PROGRAM AND THE WATER-RESOURCES TECHNOLOGY DEVELOPMENT PROGRAM Application, Evaluation, and Management...

  6. 23 CFR 650.411 - Procedures for bridge replacement and rehabilitation projects.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Procedures for bridge replacement and rehabilitation... ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.411 Procedures for bridge replacement and rehabilitation projects. (a) Consideration...

  7. Highway travel time estimation with data fusion

    CERN Document Server

    Soriguera Martí, Francesc

    2016-01-01

    This monograph presents a simple, innovative approach for the measurement and short-term prediction of highway travel times based on the fusion of inductive loop detector and toll ticket data. The methodology is generic and not technologically captive, allowing it to be easily generalized for other equivalent types of data. The book shows how Bayesian analysis can be used to obtain fused estimates that are more reliable than the original inputs, overcoming some of the drawbacks of travel-time estimations based on unique data sources. The developed methodology adds value and obtains the maximum (in terms of travel time estimation) from the available data, without recurrent and costly requirements for additional data. The application of the algorithms to empirical testing in the AP-7 toll highway in Barcelona proves that it is possible to develop an accurate real-time, travel-time information system on closed-toll highways with the existing surveillance equipment, suggesting that highway operators might provide...

  8. The relation between project management education and newer streams in project management research

    DEFF Research Database (Denmark)

    Leimbach, Timo; Goodall, Julie Bladt

    2017-01-01

    In the last decades, research in project management (PM) has experienced significant new inputs from a range of new PM methodologies and critical research streams. As a consequence, members of the more critical streams have called for the education of project managers to advance from that of trai......In the last decades, research in project management (PM) has experienced significant new inputs from a range of new PM methodologies and critical research streams. As a consequence, members of the more critical streams have called for the education of project managers to advance from...... that of training technicians, to fostering reflective practitioners that are better equipped to handle the increasing complexity of the profession. This paper is based on a recently commenced re-search project titled "Rethinking Project Management Education – the Role of Universities" that is aimed at analysing...... how the development of PM research is reflected in the education of project managers. On the basis of a short overview of the state of the art of PM education research and practices, the possible challenges for the development of PM education are discussed, and, finding that there is a lack...

  9. 78 FR 54949 - Major Project Financial Plan Guidance

    Science.gov (United States)

    2013-09-06

    ...'' (GA-090-751). That report recommended that Financial Plans include the cost of financing the project... Project Financial Plan Guidance AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice; Request for comments. SUMMARY: This notice requests comments on draft Major Project Financial Plan...

  10. Characteristics of heavy metal pollution on roadside soil along highway

    Science.gov (United States)

    Zheng, Chaocheng

    2017-10-01

    Highway traffic is the main source of heavy metal pollution. Due to limited cropland, it is very common to plant crops along the highways. So, in view of agricultural products safety, heavy metal pollution by highway traffic to soils along highway is widely concerned. Therefore, to study distribution traits, accumulative laws and influence factors of heavy metals in agricultural soils could provide scientific evidence and theoretical basis for environmental protection along express way.

  11. 23 CFR 710.313 - Design-build projects.

    Science.gov (United States)

    2010-04-01

    ... FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RIGHT-OF-WAY AND ENVIRONMENT RIGHT-OF-WAY AND REAL ESTATE Project Development § 710.313 Design-build projects. (a) In the case of a design-build project, right-of-way must be acquired and cleared in accordance with the Uniform Relocation Assistance...

  12. Assessment of highway pavements using GPR

    Science.gov (United States)

    Plati, Christina; Loizos, Andreas

    2015-04-01

    Highway infrastructure is a prerequisite for a functioning economy and social life. Highways, often prone to congestion and disruption, are one of the aspects of a modern transport network that require maximum efficiency if an integrated transport network, and sustainable mobility, is to be achieved. Assessing the condition of highway structures, to plan subsequent maintenance, is essential to allow the long-term functioning of a road network. Optimizing the methods used for such assessment will lead to better information being obtained about the road and underlying ground conditions. The condition of highway structures will be affected by a number of factors, including the properties of the highway pavement, the supporting sub-base and the subgrade (natural ground), and the ability to obtain good information about the entire road structure, from pavement to subgrade, allows appropriate maintenance programs to be planned. The maintenance of highway pavements causes considerable cost and in many cases obstruction to traffic flow. In this situation, methods that provide information on the present condition of pavement structure non-destructively and economically are of great interest. It has been shown that Ground-Penetrating-Radar (GPR), which is a Non Destructive Technique (NDT), can deliver information that is useful for the planning of pavement maintenance activities. More specifically GPR is used by pavement engineers in order to determine physical properties and characteristics of the pavement structure, information that is valuable for the assessment of pavement condition. This work gives an overview on the practical application of GPR using examples from highway asphalt pavements monitoring. The presented individual applications of GPR pavement diagnostics concern structure homogeneity, thickness of pavement layers, dielectric properties of asphalt materials etc. It is worthwhile mentioning that a number of applications are standard procedures, either

  13. Advanced energy projects FY 1992 research summaries

    International Nuclear Information System (INIS)

    1992-09-01

    The Division of Advanced Energy Projects (AEP) provides support to explore the feasibility of novel, energy-related concepts that evolve from advances in basic research. These concepts are typically at an early stage of scientific definition and, therefore, are beyond the scope of ongoing applied research or technology development programs. The Division provides a mechanism for converting basic research findings to applications that eventually could impact the Nation's energy economy. Technical topics include physical, chemical, materials, engineering, and biotechnologies. Projects can involve interdisciplinary approaches to solve energy-related problems. Projects are supported for a finite period of time, which is typically three years. Annual funding levels for projects are usually about $300,000 but can vary from approximately $50,000 to $500,000. It is expected that, following AEP support, each concept will be sufficiently developed and promising to attract further funding from other sources in order to realize its full potential. There were 39 research projects in the Division of Advanced Energy Projects during Fiscal Year 1992 (October 1, 1991 -- September 30, 1992). The abstracts of those projects are provided to introduce the overall program in Advanced Energy Projects. Further information on a specific project may be obtained by contacting the principal investigator, who is listed below the project title. Projects completed during FY 1992 are indicated

  14. Air quality and energy impacts of NYSDOT highway ROW management.

    Science.gov (United States)

    2010-08-01

    Mowing the highway right-of-way is important for the safety of roadway users and maintaining the highway infrastructure. However, little quantitative data are available on the energy use and air quality impacts of highway mowing activities. In this r...

  15. Toxicology research projects directory, 1978. Monthly repts

    International Nuclear Information System (INIS)

    1978-01-01

    The Toxicology Research Projects Directory is a monthly publication of ongoing research projects in toxicology and related fields selected from the files of the Smithsonian Science Information Exchange (SSIE). Each issue lists toxicology-related research projects reported to SSIE during the one-month period preceding that issue. Each of the summaries is categorized by scientific discipline and assigned a unique identification number for cross-referencing from the Directory Indexes--Subject, Investigator, Performing Organization, Supporting Agency, and Master Grant Number. The thirteenth issue consists of Cumulative Indexes for the entire volume with referencing to projects in all of the previous twelve issues. The emphasis of the Directory is on the manifestations of the exposure of man and animals to toxic substances. Projects are classified by toxic agents, research orientation, and areas of environmental concern

  16. Analysis Of Investment Feasibility Of Batching Plant Development In Tanjung Redeb Talisayan Highway Km 102 In Biatan District Berau Regency

    Directory of Open Access Journals (Sweden)

    Ali Rosit

    2017-12-01

    Full Text Available This research is a feasibility study of Batching Plant development on Tanjung Redeb - Talisayan Highway Km 102 Biatan District Berau Regency which aims to know whether the development project can be built in terms of technical and economic aspects and to analyze the sensitivity with 3 types of economic situation. The data from this field study are analyzed using Present Value Net Present Value NPV Internal Rate of Return IRR Benefit Cost Ratio BCR and Payback Periods PBP. The results of the analysis show that Batching Plant Development on Tanjung Redeb Talisayan Highway Km 102 in Biatan District Berau Regency is quite feasible to be implemented with the assumption of 10 years investment period. Based on the calculation of Net Present Value NPV of IDR 11.499.703.942 positive Internal Rate of Return 1727 12 Benefit Cost Ratio 2309 1 with Payback Period is 5 years 7 months from the sensitivity analysis results the condition of the initial investment cost rate run up reaches to 127 the state of interest rates rose to 1454 due to uncertainty in the national and international economies and the circumstances when cash flows fell as a result of the decrease in revenues to 1684 where the circumstances state that the project which is about to be affected is not feasible or break event.

  17. Highways and outposts: economic development and health threats in the central Brazilian Amazon region.

    Science.gov (United States)

    Barcellos, Christovam; Feitosa, Patrícia; Damacena, Giseli N; Andreazzi, Marco A

    2010-06-17

    Economic development is often evoked as a driving force that has the capacity to improve the social and health conditions of remote areas. However, development projects produce uneven impacts on local communities, according to their different positions within society. This study examines the spatial distribution of three major health threats in the Brazilian Amazon region that may undergo changes through highway construction. Homicide mortality, AIDS incidence and malaria prevalence rates were calculated for 70 municipalities located within the areas of influence of the Cuiabá-Santarém highway (BR-163), i.e. in the western part of the state of Pará state and the northern part of Mato Grosso. The municipalities were characterized using social and economic indicators such as gross domestic product (GDP), urban and indigenous populations, and recent migration. The municipalities' connections to the region's main transportation routes (BR-163 and Trans-Amazonian highways, along with the Amazon and Tapajós rivers) were identified by tagging the municipalities that have boundaries crossing these routes, using GIS overlay operations. Multiple regression was used to identify the major driving forces and constraints relating to the distribution of health threats. The main explanatory variables for higher malaria prevalence were: proximity to the Trans-Amazonian highway, high proportion of indigenous population and low proportion of migrants. High homicide rates were associated with high proportions of migrants, while connection to the Amazon River played a protective role. AIDS incidence was higher in municipalities with recent increases in GDP and high proportions of urban population. Highways induce social and environmental changes and play different roles in spreading and maintaining diseases and health threats. The most remote areas are still protected against violence but are vulnerable to malaria. Rapid economic and demographic growth increases the risk of AIDS

  18. Highways and outposts: economic development and health threats in the central Brazilian Amazon region

    Directory of Open Access Journals (Sweden)

    Damacena Giseli N

    2010-06-01

    Full Text Available Abstract Background Economic development is often evoked as a driving force that has the capacity to improve the social and health conditions of remote areas. However, development projects produce uneven impacts on local communities, according to their different positions within society. This study examines the spatial distribution of three major health threats in the Brazilian Amazon region that may undergo changes through highway construction. Homicide mortality, AIDS incidence and malaria prevalence rates were calculated for 70 municipalities located within the areas of influence of the Cuiabá-Santarém highway (BR-163, i.e. in the western part of the state of Pará state and the northern part of Mato Grosso. Results The municipalities were characterized using social and economic indicators such as gross domestic product (GDP, urban and indigenous populations, and recent migration. The municipalities' connections to the region's main transportation routes (BR-163 and Trans-Amazonian highways, along with the Amazon and Tapajós rivers were identified by tagging the municipalities that have boundaries crossing these routes, using GIS overlay operations. Multiple regression was used to identify the major driving forces and constraints relating to the distribution of health threats. The main explanatory variables for higher malaria prevalence were: proximity to the Trans-Amazonian highway, high proportion of indigenous population and low proportion of migrants. High homicide rates were associated with high proportions of migrants, while connection to the Amazon River played a protective role. AIDS incidence was higher in municipalities with recent increases in GDP and high proportions of urban population. Conclusions Highways induce social and environmental changes and play different roles in spreading and maintaining diseases and health threats. The most remote areas are still protected against violence but are vulnerable to malaria. Rapid

  19. Internationalization Measures in Large Scale Research Projects

    Science.gov (United States)

    Soeding, Emanuel; Smith, Nancy

    2017-04-01

    Internationalization measures in Large Scale Research Projects Large scale research projects (LSRP) often serve as flagships used by universities or research institutions to demonstrate their performance and capability to stakeholders and other interested parties. As the global competition among universities for the recruitment of the brightest brains has increased, effective internationalization measures have become hot topics for universities and LSRP alike. Nevertheless, most projects and universities are challenged with little experience on how to conduct these measures and make internationalization an cost efficient and useful activity. Furthermore, those undertakings permanently have to be justified with the Project PIs as important, valuable tools to improve the capacity of the project and the research location. There are a variety of measures, suited to support universities in international recruitment. These include e.g. institutional partnerships, research marketing, a welcome culture, support for science mobility and an effective alumni strategy. These activities, although often conducted by different university entities, are interlocked and can be very powerful measures if interfaced in an effective way. On this poster we display a number of internationalization measures for various target groups, identify interfaces between project management, university administration, researchers and international partners to work together, exchange information and improve processes in order to be able to recruit, support and keep the brightest heads to your project.

  20. Advanced energy projects FY 1997 research summaries

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    The mission of the Advanced Energy Projects (AEP) program is to explore the scientific feasibility of novel energy-related concepts that are high risk, in terms of scientific feasibility, yet have a realistic potential for a high technological payoff. The concepts supported by the AEP are typically at an early stage of scientific development. They often arise from advances in basic research and are premature for consideration by applied research or technology development programs. Some are based on discoveries of new scientific phenomena or involve exploratory ideas that span multiple scientific and technical disciplines which do not fit into an existing DOE program area. In all cases, the objective is to support evaluation of the scientific or technical feasibility of the novel concepts involved. Following AEP support, it is expected that each concept will be sufficiently developed to attract further funding from other sources to realize its full potential. Projects that involve evolutionary research or technology development and demonstration are not supported by AEP. Furthermore, research projects more appropriate for another existing DOE research program are not encouraged. There were 65 projects in the AEP research portfolio during Fiscal Year 1997. Eigheen projects were initiated during that fiscal year. This document consists of short summaries of projects active in FY 1997. Further information of a specific project may be obtained by contacting the principal investigator.

  1. Introducing Principles of Land Surveying by Assigning a Practical Project

    OpenAIRE

    Introducing Principles of Land Surveying by Assigning a Practical Project

    2016-01-01

    A practical project is used in an engineering surveying course to expose sophomore and junior civil engineering students to several important issues related to the use of basic principles of land surveying. The project, which is the design of a two-lane rural highway to connect between two arbitrary points, requires students to draw the profile of the proposed highway along with the existing ground level. Areas of all cross-sections are then computed to enable quantity computations between th...

  2. 'Ethiopia-Netherlands AIDS research project'

    NARCIS (Netherlands)

    Sanders, E. J.; Rinke de Wit, T. F.; Fontanet, A. L.; Goudsmit, J.; Miedema, F.; Coutinho, R. A.

    2001-01-01

    The 'Ethiopia-Netherlands AIDS Research Project' (ENARP), started in 1994, is a long-term collaboration between AIDS researchers in Amsterdam and the Ethiopian Health and Nutrition Research Institute in Addis Ababa. The ENARP's primary objectives include conducting studies on HIV and AIDS in

  3. Trend and concentrations of legacy lead (Pb) in highway runoff.

    Science.gov (United States)

    Kayhanian, Masoud

    2012-01-01

    This study presents the results of lead (Pb) concentrations from both highway runoff and contaminated soil along 32 and 23 highway sites, respectively. In general, the Pb concentration on topsoil (0-15 cm) along highways was much higher than the Pb concentration in subsurface soil (15-60 cm). The Pb deposited on soil appears to be anthropogenic and a strong correlation was found between the Pb concentration in surface soil and highway runoff in urban areas. The concentration of Pb measured during 1980s from highways runoff throughout the world was up to 11 times higher than the measured values in mid 1990 s and 2000s. The current Pb deposited on soil near highways appears to be a mixture of paint, tire weight balance and old leaded gasoline combustion. Overall, the Pb phase-out regulation reduced the Pb deposits in the environment and consequently lowered Pb loading into receiving waters. Copyright © 2011 Elsevier Ltd. All rights reserved.

  4. Characterization of the Highway 95 Fault in lower Fortymile Wash using electrical and electromagnetic methods, Nye County, Nevada

    Science.gov (United States)

    Macy, Jamie P.; Kryder, Levi; Walker, Jamieson

    2012-01-01

    The Highway 95 Fault is a buried, roughly east-west trending growth fault at the southern extent of Yucca Mountain and Southwestern Nevada Volcanic Field. Little is known about the role of this fault in the movement of groundwater from the Yucca Mountain area to downgradient groundwater users in Amargosa Valley. The U.S. Geological Survey (USGS) Arizona Water Science Center (AZWSC), in cooperation with the Nye County Nuclear Waste Repository Project Office (NWRPO), has used direct current (DC) resistivity, controlled-source audio magnetotelluric (CSAMT), and transient electromagnetics (TEM) to better understand the fault. These geophysical surveys were designed to look at structures buried beneath the alluvium, following a transect of wells for lithologic control. Results indicate that the fault is just north of U.S. Highway 95, between wells NC-EWDP-2DB and -19D, and south of Highway 95, east of well NC-EWDP-2DB. The Highway 95 Fault may inhibit shallow groundwater movement by uplifting deep Paleozoic carbonates, effectively reducing the overlying alluvial aquifer thickness and restricting the movement of water. Upward vertical hydraulic gradients in wells proximal to the fault indicate that upward movement is occurring from deeper, higher-pressure aquifers.

  5. 76 FR 8400 - National Highway Traffic Safety Administration

    Science.gov (United States)

    2011-02-14

    ... DEPARTMENT OF TRANSPORTATION National Highway Traffic Safety Administration Petition for Exemption From the Vehicle Theft Prevention Standard; Mitsubishi Motors AGENCY: National Highway Traffic Safety Administration (NHTSA) Department of Transportation (DOT). ACTION: Grant of petition for exemption. SUMMARY: This...

  6. The Information Highway.

    Science.gov (United States)

    Gore, Al

    1994-01-01

    The new information marketplace is based on a network of wide, two-way highways comprised of private owners and developers, makers of information appliances (televisions, telephones, computers, and combinations of all three), information providers (local broadcasters, digital libraries, information service providers, and entrepreneurs), and…

  7. Risk assessment of underpass infrastructure project based on IS0 31000 and ISO 21500 using fishbone diagram and RFMEA (project risk failure mode and effects analysis) method

    Science.gov (United States)

    Purwanggono, Bambang; Margarette, Anastasia

    2017-12-01

    Completion time of highway construction is very meaningful for smooth transportation, moreover expected number of ownership motor vehicle will increase each year. Therefore, this study was conducted with to analyze the constraints that contained in an infrastructure development project. This research was conducted on Jatingaleh Underpass Project, Semarang. This research was carried out while the project is running, on the implementation, this project is experiencing delays. This research is done to find out what are the constraints that occur in execution of a road infrastructure project, in particular that causes delays. The method that used to find the root cause is fishbone diagram to obtain a possible means of mitigation. Coupled with the RFMEA method used to determine the critical risks that must be addressed immediately on road infrastructure project. The result of data tabulation in this study indicates that the most possible mitigation tool to make a Standard Operating Procedure (SOP) recommendations to disrupt utilities that interfere project implementation. Process of risk assessment has been carried out systematically based on ISO 31000:2009 on risk management and for determination of delayed variables, the requirements of process groups according to ISO 21500:2013 on project management were used.

  8. Highway traffic simulation on multi-processor computers

    Energy Technology Data Exchange (ETDEWEB)

    Hanebutte, U.R.; Doss, E.; Tentner, A.M.

    1997-04-01

    A computer model has been developed to simulate highway traffic for various degrees of automation with a high level of fidelity in regard to driver control and vehicle characteristics. The model simulates vehicle maneuvering in a multi-lane highway traffic system and allows for the use of Intelligent Transportation System (ITS) technologies such as an Automated Intelligent Cruise Control (AICC). The structure of the computer model facilitates the use of parallel computers for the highway traffic simulation, since domain decomposition techniques can be applied in a straight forward fashion. In this model, the highway system (i.e. a network of road links) is divided into multiple regions; each region is controlled by a separate link manager residing on an individual processor. A graphical user interface augments the computer model kv allowing for real-time interactive simulation control and interaction with each individual vehicle and road side infrastructure element on each link. Average speed and traffic volume data is collected at user-specified loop detector locations. Further, as a measure of safety the so- called Time To Collision (TTC) parameter is being recorded.

  9. Cost of Capital Estimation for Highway Concessionaires in Chile

    Directory of Open Access Journals (Sweden)

    Cristian Vergara-Novoa

    2018-01-01

    Full Text Available In this paper, we present the cost of capital estimation for highway concessionaires in Chile. We estimated the cost of equity and the cost of debt and determined the capital structure for each one of twenty-four concessionaires that operate highways. We based our estimations on the developments of Sharpe (1964, Modigliani and Miller (1958, and Maquieira (2009, which were also compared with the Brusov et al. (2015 developments. We collected stock prices for different highway concessionaires around the world from Google Finance and Reuters’ websites in order to determine the Beta of equity using a representative company. After that, we estimated the cost of equity considering Hamada (1969 and a Capital Asset Pricing Model. Then, we estimated the cost of capital using the cost of debt and the capital structure of Chile’s highway concessionaires. With all above, we were able to determine the Weighted Average Cost of Capital (WACC for highway concessions which ranges from 5.49 to 6.62%.

  10. Integrated Project Delivery (IPD Research Trends.

    Directory of Open Access Journals (Sweden)

    Kahvandi, Z.

    2017-07-01

    Full Text Available Integrated Project Delivery (IPD is introduced as a vibrant approach to enhance project implementation, having particular position in recent studies among construction researchers. This study analyzes the research trends on the field of IPD to provide an appropriate vision for future researchers in this specialized field. While so far no comprehensive research has been done in this field, this study provides a comprehensive review of existing studies through in-depth literature review method. This research evaluates studies conducted in the field of IPD, which is a basis for future researchers to improve conditions of IPD implementation in different countries. For that this study Using library studies, the trend of researches conducted on various concepts and domains during various years, has been investigated. Future studies can simply use the outputs of this research to shape their research flow on establishing continuing progress of IPD. The data obtained from descriptive analyses are illustrated quantitatively, followed by comprehensive analyses and discussion of the results. Moreover, this study concluded that during recent years, the trend of studies conducted about IPD has increased, particularly articles examined challenges. In the next step, more studies have been performed in the field of construction. Those articles are preferred that have evaluated principles, challenges, and solutions for resolving barriers. Proper IPD implementation facilitates enhanced share of information and early identification of stakeholders through a proper timing as vital keys to realize objectives of the construction projects, reduce risks, and increase the chance of project success.

  11. Efficient and effective implementation of alternative project delivery methods.

    Science.gov (United States)

    2017-05-01

    Over the past decade, the Maryland Department of Transportation State Highway : Administration (MDOT SHA) has implemented Alternative Project Delivery (APD) methods : in a number of transportation projects. While these innovative practices have produ...

  12. Pendulum impact tests of wooden and steel highway guardrail posts

    Science.gov (United States)

    Charles J. Gatchell; Jarvis D. Michie

    1974-01-01

    Impact strength characteristics of southern pine, red oak, and steel highway guardrail posts were evaluated in destructive impact testing with a 4,000-pound pendulum at the Southwest Research Institute. Effects were recorded with high-speed motion-picture equipment. Comparisons were based on reactions to the point of major post failure. Major comparisons of 6x6-inch...

  13. Photovoltaic demonstration project. Final report

    International Nuclear Information System (INIS)

    Jicarilla Apache Tribe

    2002-01-01

    The Jicarilla Apache Nation is in Rio Arriba County in North Central New Mexico. The photovoltaic project was installed at the Dulce High School in the town of Dulce. Dulce is in the most northern part of the reservation near the New Mexico/Colorado boundary and can be reached from the New Mexico State Capitol in Santa Fe, hence to the town of Chama along U.S. Highway 84 to the junction of U.S. Highway 64. Dulce is about 12 miles west of the junction along U.S. Highway 64. Dulce community is in the mountainous part of the Nation with a population of about 4000. No industry exists in the community, however, a few commercial sites do exist such as a motel, restaurants, gas stations, food and liquor stores

  14. Advanced energy projects FY 1994 research summaries

    International Nuclear Information System (INIS)

    1994-09-01

    The Division of Advanced Energy Projects (AEP) provides support to explore the feasibility of novel, energy-related concepts that evolve from advances in basic research. These concepts are typically at an early stage of scientific definition and, therefore, are premature for consideration by applied research or technology development programs. The AEP also supports high-risk, exploratory concepts that do not readily fit into a program area but could have several applications that may span scientific disciplines or technical areas. Projects supported by the Division arise from unsolicited ideas and concepts submitted by researchers. The portfolio of projects is dynamic and reflects the broad role of the Department in supporting research and development for improving the Nation's energy outlook. FY 1994 projects include the following topical areas: novel materials for energy technology; renewable and biodegradable materials; exploring uses of new scientific discoveries; alternate pathways to energy efficiency; alternative energy sources; and innovative approaches to waste treatment and reduction. Summaries are given for 66 projects

  15. An optimization model for improving highway safety

    Directory of Open Access Journals (Sweden)

    Promothes Saha

    2016-12-01

    Full Text Available This paper developed a traffic safety management system (TSMS for improving safety on county paved roads in Wyoming. TSMS is a strategic and systematic process to improve safety of roadway network. When funding is limited, it is important to identify the best combination of safety improvement projects to provide the most benefits to society in terms of crash reduction. The factors included in the proposed optimization model are annual safety budget, roadway inventory, roadway functional classification, historical crashes, safety improvement countermeasures, cost and crash reduction factors (CRFs associated with safety improvement countermeasures, and average daily traffics (ADTs. This paper demonstrated how the proposed model can identify the best combination of safety improvement projects to maximize the safety benefits in terms of reducing overall crash frequency. Although the proposed methodology was implemented on the county paved road network of Wyoming, it could be easily modified for potential implementation on the Wyoming state highway system. Other states can also benefit by implementing a similar program within their jurisdictions.

  16. Frequency and distribution of highway crossings by Kenai Peninsula brown bears

    OpenAIRE

    Graves, Tabitha A.; Farley, Sean; Servheen, Christopher

    2003-01-01

    Highway construction and expansion through bear habitat can negatively affect brown bear populations. Highway structures can decrease habitat availability through habitat loss and restricted access, roads often displace animals and cause re-direction of natural movements, and highways can act as barriers to decrease gene flow. Lastly, highway traffic can cause direct bear and human mortality through car-animal collisions. We examined the spatial and temporal distribution of brown bear crossin...

  17. Response of benthic macroinvertebrate communities to highway construction in an Appalachian watershed

    Science.gov (United States)

    Hedrick, Lara B.; Welsh, S.A.; Anderson, James T.; Lin, L.-S.; Chen, Y.; Wei, X.

    2010-01-01

    Highway construction in mountainous areas can result in sedimentation of streams, negatively impacting stream habitat, water quality, and biotic communities. We assessed the impacts of construction of a segment of Corridor H, a four-lane highway, in the Lost River watershed, West Virginia, by monitoring benthic macroinvertebrate communities and water quality, before, during, and after highway construction and prior to highway use at upstream and downstream sites from 1997 through 2007. Data analysis of temporal impacts of highway construction followed a Before-After-Control-Impact (BACI) study design. Highway construction impacts included an increase in stream sedimentation during the construction phase. This was indicated by an increase in turbidity and total suspended solids. Benthic macroinvertebrate metrics indicated a community more tolerant during and after construction than in the period before construction. The percent of Chironomidae and the Hilsenhoff Biotic Index (HBI) increased, while percent of Ephemeroptera, Plecoptera, and Trichoptera (EPT) decreased. Our 10-year study addressed short-term impacts of highway construction and found that impacts were relatively minimal. A recovery of the number of EPT taxa collected after construction indicated that the benthic macroinvertebrate community may be recovering from impacts of highway construction. However, this study only addressed a period of 3 years before, 3 years during, and 4 years post construction. Inferences cannot be made concerning the long-term impacts of the highway, highway traffic, runoff, and other factors associated with highway use. Continual monitoring of the watershed is necessary to determine if the highway has a continual impact on stream habitat, water quality, and biotic integrity. ?? 2010 Springer Science+Business Media B.V.

  18. Highway construction work zone safety performance and improvement in Louisiana : research project capsule.

    Science.gov (United States)

    2016-08-01

    While the number of : crashes in Louisiana : construction work zones : has decreased in recent : years, the total count of : work zone crashes is still : significant, warranting : research into how to reduce : crashes. An assessment : of risk factors...

  19. Focusing Information Systems Post-Graduate Research Projects

    Directory of Open Access Journals (Sweden)

    Gail Ridley

    1996-11-01

    Full Text Available This paper reports on an investigation of mechanisms that assist Information Systems post-graduate research students to focus their projects. An evaluation is presented of the experiences of Information Systems research students in focussing their research projects based on a survey conducted of students who participated in two of the first three Information Systems doctoral consortia to be held in Australia. The survey sought to determine whether a doctoral consortium or 'systematic expert review' is the most valuable mechanism for focussing a research proposal. Systematic expert review was considered by the students to be more effective than the doctoral consortium process for the purpose of focussing their research project proposals.

  20. Diversity in research projects - A key to success?

    Science.gov (United States)

    Henkel, Daniela; Eisenhauer, Anton; Taubner, Isabelle

    2017-04-01

    According to demographers, psychologists, sociologists and economists diverse groups, which are groups of different race, ethnicity, gender and sexual orientation, are more innovative than homogeneous groups. This is also true for groups working together in research collaborations and international cooperation involving a culturally and functionally diverse mix of individuals who have to be integrated into an effective unit - a project team. If the goal is scientific excellence, diversity should be an essential ingredient to conduct science on high level productivity, quality and innovation. Effective teamwork is a key to project success and prime responsibilities of the project manager. Therefore, the project manager has to take into consideration different characteristics such as cultures, languages, and different values related to individual project partners. Here we show how diversity can affect the performance of a research project. Furthermore, the presentation indicates skills and abilities which are required for the management in order to deal also with the challenges of diversity in research projects. The presentation is based on insights experienced in the context of an Innovative Training Network (ITN) project within Marie Skłodowska-Curie Actions of the European HORIZON 2020 program and TRION a Collaborative Research Project in the Framework of the Trilateral Program of the German Research Foundation.

  1. Evaluation of the New Jersey Digital Highway

    Directory of Open Access Journals (Sweden)

    Judy Jeng

    2008-12-01

    Full Text Available The aim of this research is to study the usefulness of the New Jersey Digital Highway (NJDH, www.njdigitalhighway.org and its portal structure. The NJDH intends to provide an immersive and user-centered portal for New Jersey history and culture. The research recruited 145 participants and used a Web-based questionnaire that contained three sections: for everyone, for educators, and for curators. The feedback on the usefulness of the NJDH was positive and the portal structure was favorable. The research uncovered several reasons why some collections did not want to or could not participate. The findings also suggested priorities for further development. This study is one of the few on the evaluation of cultural heritage digital library.

  2. Highway crash rates and age-related driver limitations: Literature review and evaluation of data bases

    Energy Technology Data Exchange (ETDEWEB)

    Hu, P.S. [Oak Ridge National Lab., TN (United States); Young, J.R. [Tennessee Univ., Knoxville, TN (United States); Lu, An [Oak Ridge Associated Universities, Inc., TN (United States)

    1993-08-01

    American society is undergoing a major demographic transformation that is resulting in a larger proportion of older individuals in the population. Moreover, recent travel surveys show that an increasing number of older individuals are licensed to drive and that they drive more than their same age cohort a decade ago. However, they continue to take shorter trips than younger drivers and they avoid driving during congested hours. This recent demographic transformation in our society, the graying of America, coupled with the increasing mobility of the older population impose a serious highway safety issue that cannot be overlooked. Some of the major concerns are the identification of ``high-risk`` older drivers and the establishment of licensing guidelines and procedures that are based on conclusive scientific evidence. Oak Ridge National Laboratory`s (ORNL) objectives in this project can be characterized by the following tasks: Review and evaluate the 1980 American Association of Motor Vehicle Administrators (AAMVA) and National Highway Traffic Safety Administration (NHTSA) licensing guidelines. Determine whether the license restriction recommended in the 1980 AAMVA and NHTSA guidelines was based on scientific evidence or on judgement of medical advisors. Identify in the scientific literature any medical conditions which are found to be highly associated with highway crashes, and which are not mentioned in the 1980 guidelines. Summarize States` current licensing practices for drivers with age-related physical and mental limitations. Identify potential data sources to establish conclusive evidence on age-related functional impairments and highway crashes.

  3. Alternate bidding strategies for asphalt and concrete pavement projects utilizing life cycle cost analysis (LCCA).

    Science.gov (United States)

    2012-07-01

    Recent changes in pavement materials costs have impacted the competitive environment relative to the : determination of the most cost effective pavement structure for a specific highway project. In response, State : highway agencies have renewed thei...

  4. Mortality among California highway workers.

    Science.gov (United States)

    Maizlish, N; Beaumont, J; Singleton, J

    1988-01-01

    Standardized proportional mortality ratios (PMR) were computed for a population of highway workers. Hazards of highway maintenance work include exposure to solvents, herbicides, asphalt and welding fumes, diesel and auto exhaust, asbestos, abrasive dusts, hazardous material spills, and moving motor vehicles. Underlying cause of death was obtained for 1,570 workers who separated from the California Department of Transportation between 1970 and 1983, and who died in California between 1970 and 1983 (inclusive). Among 1,260 white males, the major findings were statistically significant excesses of cancers of digestive organs (PMR = 128), skin (PMR = 218), lymphopoietic cancer (PMR = 157), benign neoplasms (PMR = 343), motor vehicle accidents (PMR = 141), and suicide (PMR = 154). Black males (N = 66) experienced nonsignificant excesses of cancer of the digestive organs (PMR = 191) and arteriosclerotic heart disease (PMR = 143). Among 168 white females, deaths from lung cancer (PMR = 189) and suicide (PMR = 215) were elevated. White male retirees, a subgroup with 5 or more years of service, experienced excess mortality due to cancers of the colon (PMR = 245), skin (PMR = 738), brain (PMR = 556), and lymphosarcomas and reticulosarcomas (PMR = 514). Deaths from external causes (PMR = 135) and cirrhosis of the liver (PMR = 229) were elevated among white males with a last job in landscape maintenance. White males whose last job was highway maintenance experienced a deficit in mortality from circulatory diseases (PMR = 83) and excess mortality from emphysema (PMR = 250) and motor vehicle accidents (PMR = 196). Further epidemiologic and industrial hygiene studies are needed to confirm the apparent excess mortality and to quantify occupational and nonoccupational exposures. However, reduction of recognized hazards among highway maintenance workers is a prudent precautionary measure.

  5. Robust Vehicle and Traffic Information Extraction for Highway Surveillance

    Directory of Open Access Journals (Sweden)

    Yeh Chia-Hung

    2005-01-01

    Full Text Available A robust vision-based traffic monitoring system for vehicle and traffic information extraction is developed in this research. It is challenging to maintain detection robustness at all time for a highway surveillance system. There are three major problems in detecting and tracking a vehicle: (1 the moving cast shadow effect, (2 the occlusion effect, and (3 nighttime detection. For moving cast shadow elimination, a 2D joint vehicle-shadow model is employed. For occlusion detection, a multiple-camera system is used to detect occlusion so as to extract the exact location of each vehicle. For vehicle nighttime detection, a rear-view monitoring technique is proposed to maintain tracking and detection accuracy. Furthermore, we propose a method to improve the accuracy of background extraction, which usually serves as the first step in any vehicle detection processing. Experimental results are given to demonstrate that the proposed techniques are effective and efficient for vision-based highway surveillance.

  6. An integrated model for the Environmental Impact Assessment of Highways in China

    DEFF Research Database (Denmark)

    Cai, Hao

    2011-01-01

    In China, environmental issues caused by construction and operation of highway catch more and more attention, and thus environmental impact assessment of highway has become an important part of feasibility study. According to the Specifications for Environmental Impact Assessment of Highways...... in the People's Republic of China, this paper proposes an integrated model for Environmental Impact Assessment (EIA) of highway. The model has two main characteristics. Firstly, the whole highway is divided into several sections, and then weight of each section is distributed by its importance. Secondly...

  7. What do medical students understand by research and research skills? Identifying research opportunities within undergraduate projects.

    Science.gov (United States)

    Murdoch-Eaton, Deborah; Drewery, Sarah; Elton, Sarah; Emmerson, Catherine; Marshall, Michelle; Smith, John A; Stark, Patsy; Whittle, Sue

    2010-01-01

    Undergraduate research exposure leads to increased recruitment into academic medicine, enhanced employability and improved postgraduate research productivity. Uptake of undergraduate research opportunities is reported to be disappointing, and little is known about how students perceive research. To investigate opportunities for undergraduate participation in research, recognition of such opportunities, and associated skills development. A mixed method approach, incorporating student focus and study groups, and documentary analysis at five UK medical schools. Undergraduates recognised the benefits of acquiring research skills, but identified practical difficulties and disadvantages of participating. Analysis of 905 projects in four main research skill areas - (1) research methods; (2) information gathering; (3) critical analysis and review; (4) data processing - indicated 52% of projects provided opportunities for students to develop one or more skills, only 13% offered development in all areas. In 17%, project descriptions provided insufficient information to determine opportunities. Supplied with information from a representative sample of projects (n = 80), there was little consensus in identifying skills among students or between students and researchers. Consensus improved dramatically following guidance on how to identify skills. Undergraduates recognise the benefits of research experience but need a realistic understanding of the research process. Opportunities for research skill development may not be obvious. Undergraduates require training to recognise the skills required for research and enhanced transparency in potential project outcomes.

  8. Inter-individual variability of stone marten behavioral responses to a highway.

    Directory of Open Access Journals (Sweden)

    Fernando Ascensão

    Full Text Available Efforts to reduce the negative impacts of roads on wildlife may be hindered if individuals within the population vary widely in their responses to roads and mitigation strategies ignore this variability. This knowledge is particularly important for medium-sized carnivores as they are vulnerable to road mortality, while also known to use available road passages (e.g., drainage culverts for safely crossing highways. Our goal in this study was to assess whether this apparently contradictory pattern of high road-kill numbers associated with a regular use of road passages is attributable to the variation in behavioral responses toward the highway between individuals. We investigated the responses of seven radio-tracked stone martens (Martes foina to a highway by measuring their utilization distribution, response turning angles and highway crossing patterns. We compared the observed responses to simulated movement parameterized by the observed space use and movement characteristics of each individual, but naïve to the presence of the highway. Our results suggested that martens demonstrate a diversity of responses to the highway, including attraction, indifference, or avoidance. Martens also varied in their highway crossing patterns, with some crossing repeatedly at the same location (often coincident with highway passages. We suspect that the response variability derives from the individual's familiarity of the landscape, including their awareness of highway passage locations. Because of these variable yet potentially attributable responses, we support the use of exclusionary fencing to guide transient (e.g., dispersers individuals to existing passages to reduce the road-kill risk.

  9. HIGHWAY, a transportation routing model: program description and revised users' manual

    International Nuclear Information System (INIS)

    Joy, D.S.; Johnson, P.E.

    1983-10-01

    A computerized transportation routing model has been developed at the Oak Ridge National Laboratory to be used for predicting likely routes for shipping radioactive materials. The HIGHWAY data base is a computerized road atlas containing descriptions of the entire Interstate System, the federal highway system, and most of the principal state roads. In addition to its prediction of the most likely commercial route, options incorporated in the HIGHWAY model can allow for maximum use of Interstate highways or routes that will bypass urbanized areas containing populations greater than 100,000 persons. The user may also interactively modify the data base to predict routes that bypass any particular state, city, town, or specific highway segment

  10. Geotechnical considerations of perennial failures of a highway ...

    African Journals Online (AJOL)

    The causes of frequent failures of the Kumasi – Accra highway section at Wiwiso have been investigated to offer remedial measures on future reconstruction works. The study of the highway section at Wiwiso has revea-led that pavements can undergo considerable distress when seepage control considerations are partially ...

  11. Managing commodity risks in highway contracts : quantifying premiums, accounting for correlations among risk factors, and designing optimal price-adjustment contracts.

    Science.gov (United States)

    2011-09-01

    It is a well-known fact that macro-economic conditions, such as prices of commodities (e.g. oil, : cement and steel) affect the cost of construction projects. In a volatile market environment, highway : agencies often pass such risk to contractors us...

  12. Weighted Complex Network Analysis of Pakistan Highways

    Directory of Open Access Journals (Sweden)

    Yasir Tariq Mohmand

    2013-01-01

    Full Text Available The structure and properties of public transportation networks have great implications in urban planning, public policies, and infectious disease control. This study contributes a weighted complex network analysis of travel routes on the national highway network of Pakistan. The network is responsible for handling 75 percent of the road traffic yet is largely inadequate, poor, and unreliable. The highway network displays small world properties and is assortative in nature. Based on the betweenness centrality of the nodes, the most important cities are identified as this could help in identifying the potential congestion points in the network. Keeping in view the strategic location of Pakistan, such a study is of practical importance and could provide opportunities for policy makers to improve the performance of the highway network.

  13. Highway three-dimensional modeling based on Vehicle-borne laser data

    International Nuclear Information System (INIS)

    Weili, Sun; Ruofei, Zhong; Jiangxia, Wei; Fanyang, Zeng

    2014-01-01

    The of Vehicle-borne LiDAR (Light Detection And Ranging) scanning technology is an efficiently practical approach on the acquisition and application of 3D information and its geographic elements of highway(including road surface, rails, attached facilities, slopes, ditches, etc.). The acquired information is significant on many aspects such as road maintenance, reconstruction, survey, landscape design, visualized modelling and highway hazard supervision and prevention. The initial laser data cannot be directly used to construct highway 3D model, operations of pre-processing are necessary. This paper presented a set of procedure about pre-processing laser data and constructing TIN (Triangle Irregular Net) model of highway

  14. Highway runoff quality models for the protection of environmentally sensitive areas

    Science.gov (United States)

    Trenouth, William R.; Gharabaghi, Bahram

    2016-11-01

    This paper presents novel highway runoff quality models using artificial neural networks (ANN) which take into account site-specific highway traffic and seasonal storm event meteorological factors to predict the event mean concentration (EMC) statistics and mean daily unit area load (MDUAL) statistics of common highway pollutants for the design of roadside ditch treatment systems (RDTS) to protect sensitive receiving environs. A dataset of 940 monitored highway runoff events from fourteen sites located in five countries (Canada, USA, Australia, New Zealand, and China) was compiled and used to develop ANN models for the prediction of highway runoff suspended solids (TSS) seasonal EMC statistical distribution parameters, as well as the MDUAL statistics for four different heavy metal species (Cu, Zn, Cr and Pb). TSS EMCs are needed to estimate the minimum required removal efficiency of the RDTS needed in order to improve highway runoff quality to meet applicable standards and MDUALs are needed to calculate the minimum required capacity of the RDTS to ensure performance longevity.

  15. 26 CFR 1.46-11 - Commuter highway vehicles.

    Science.gov (United States)

    2010-04-01

    ... Rules for Computing Credit for Investment in Certain Depreciable Property § 1.46-11 Commuter highway... investment under section 46(c)(1) for a qualifying commuter highway vehicle is 100 percent. A qualifying... meets the following requirements: (1) The vehicle is section 38 property in the hands of the taxpayer...

  16. Highways and outposts: economic development and health threats in the central Brazilian Amazon region

    OpenAIRE

    Barcellos, Christovam; Feitosa, Patrícia; Damacena, Giseli N; Andreazzi, Marco A

    2010-01-01

    Abstract Background Economic development is often evoked as a driving force that has the capacity to improve the social and health conditions of remote areas. However, development projects produce uneven impacts on local communities, according to their different positions within society. This study examines the spatial distribution of three major health threats in the Brazilian Amazon region that may undergo changes through highway construction. Homicide mortality, AIDS incidence and malaria ...

  17. Research reactor job analysis - A project description

    International Nuclear Information System (INIS)

    Yoder, John; Bessler, Nancy J.

    1988-01-01

    Addressing the need of the improved training in nuclear industry, nuclear utilities established training program guidelines based on Performance-Based Training (PBT) concepts. The comparison of commercial nuclear power facilities with research and test reactors owned by the U.S. Department of Energy (DOE), made in an independent review of personnel selection, training, and qualification requirements for DOE-owned reactors pointed out that the complexity of the most critical tasks in research reactors is less than that in power reactors. The U.S. Department of Energy (DOE) started a project by commissioning Oak Ridge Associated Universities (ORAU) to conduct a job analysis survey of representative research reactor facilities. The output of the project consists of two publications: Volume 1 - Research Reactor Job Analysis: Overview, which contains an Introduction, Project Description, Project Methodology,, and. An Overview of Performance-Based Training (PBT); and Volume 2 - Research Reactor Job Analysis: Implementation, which contains Guidelines for Application of Preliminary Task Lists and Preliminary Task Lists for Reactor Operators and Supervisory Reactor Operators

  18. Maine highway safety plan

    Science.gov (United States)

    2010-01-01

    Each September 1, the MeBHS must provide NHTSA a comprehensive plan to reduce : traffic crashes and resulting deaths, injuries and property damage. The Highway Safety : Plan (HSP) serves as Maines application for available federal funds for these ...

  19. Development of a GIS-based failure investigation system for highway soil slopes

    Science.gov (United States)

    Ramanathan, Raghav; Aydilek, Ahmet H.; Tanyu, Burak F.

    2015-06-01

    A framework for preparation of an early warning system was developed for Maryland, using a GIS database and a collective overlay of maps that highlight highway slopes susceptible to soil slides or slope failures in advance through spatial and statistical analysis. Data for existing soil slope failures was collected from geotechnical reports and field visits. A total of 48 slope failures were recorded and analyzed. Six factors, including event precipitation, geological formation, land cover, slope history, slope angle, and elevation were considered to affect highway soil slope stability. The observed trends indicate that precipitation and poor surface or subsurface drainage conditions are principal factors causing slope failures. 96% of the failed slopes have an open drainage section. A majority of the failed slopes lie in regions with relatively high event precipitation ( P>200 mm). 90% of the existing failures are surficial erosion type failures, and only 1 out of the 42 slope failures is deep rotational type failure. More than half of the analyzed slope failures have occurred in regions having low density land cover. 46% of failures are on slopes with slope angles between 20° and 30°. Influx of more data relating to failed slopes should give rise to more trends, and thus the developed slope management system will aid the state highway engineers in prudential budget allocation and prioritizing different remediation projects based on the literature reviewed on the principles, concepts, techniques, and methodology for slope instability evaluation (Leshchinsky et al., 2015).

  20. Deploying SHRP2 renewal 10 guidebook for project management strategies for complex projects in the Georgia Department of Transportation.

    Science.gov (United States)

    2017-01-01

    The Georgia Department of Transportation (GDOT) was selected by the Federal Highway Administration (FHWA) for the Strategic Highway Research Program 2 (SHRP2) Lead Adopter Incentive Implementation Assistance Grant to deploy the Renewal 10 (R10) Guide...

  1. Business and the information highway

    Energy Technology Data Exchange (ETDEWEB)

    Meneghetti, M.F. [Western Management Consultants, Calgary, AB (Canada)

    1995-11-01

    The potential role of the information highway in the energy business was reviewed. Economic challenges, technology trends, and the opportunities available to the energy industry to exploit information technology were outlined. The `virtual` economy was identified as one of the consequences resulting from information technology, which will most likely have an impact on all aspects of the economy, including the energy industry, especially marketing. Electronic Data Interchange (EDI) for detailed business transactions, on-line services for information sharing, news, and discussion, the Internet for e-mail research, publishing, and customer contact, specialty applications for specific business functions, industry restructuring, and Fax transmission were pinpointed as the applications most likely to have the greatest impact on the business aspects of the energy industry.

  2. Hydraulic analysis, Mad River at State Highway 41, Springfield, Ohio

    Science.gov (United States)

    Mayo, Ronald I.

    1977-01-01

    A hydraulic analysis of the lad River in a reach at Springfield, Ohio was made to determine the effects of relocating State Highway 41 in 1S76. The main channel was cleaned by dredging in the vicinity cf the new highway bridge and at the Detroit, Toledo and Ironton Railway bridge upstream. The new highway was placed on a high fill with relief structures for flood plain drainage consisting of a 12-foot corrugated metal pipe culvert and a bridge opening to accommodate the Detroit, Toledo and Ironton Railway and a property access road. The effect of the new highway embankment on drainage from the flood plain was requested. Also requested was the effect that might be expected on the elevation of flood waters above the new highway embankment if the access road through the new highway embankment were raised.The study indicates that the improvement in the capacity of the main channel to carry water was such that, up to a discharge equivalent to a 25-year frequency flood, the water-surface elevation in the reach upstream from the Detroit, Toledo and Ironton Railway bridge would be about 0.6 foot lower than under conditions prior to the construction on State Highway 41. Diversion through the Mad River left bank levee break above the Detroit, Toledo and Ironton Railway bridge to the flood Flain would be decreased about one-half in terms of rate of discharge in cubic feet per second. The maximum difference in elevation cf the flood water between the upstream and downstream side of the new State Highway 41 embankment would be about 0.2 foot, with an additional 0.4 foot to be expected if the access road were raised 1.5 feet.

  3. Linguistic analysis of project ownership for undergraduate research experiences.

    Science.gov (United States)

    Hanauer, D I; Frederick, J; Fotinakes, B; Strobel, S A

    2012-01-01

    We used computational linguistic and content analyses to explore the concept of project ownership for undergraduate research. We used linguistic analysis of student interview data to develop a quantitative methodology for assessing project ownership and applied this method to measure degrees of project ownership expressed by students in relation to different types of educational research experiences. The results of the study suggest that the design of a research experience significantly influences the degree of project ownership expressed by students when they describe those experiences. The analysis identified both positive and negative aspects of project ownership and provided a working definition for how a student experiences his or her research opportunity. These elements suggest several features that could be incorporated into an undergraduate research experience to foster a student's sense of project ownership.

  4. NGA-West2 Research Project

    Science.gov (United States)

    Bozorgnia, Yousef; Abrahamson, Norman A.; Al Atik, Linda; Ancheta, Timothy D.; Atkinson, Gail M.; Baker, Jack W.; Baltay, Annemarie S.; Boore, David M.; Campbell, Kenneth W.; Chiou, Brian S.J.; Darragh, Robert B.; Day, Steve; Donahue, Jennifer; Graves, Robert W.; Gregor, Nick; Hanks, Thomas C.; Idriss, I. M.; Kamai, Ronnie; Kishida, Tadahiro; Kottke, Albert; Mahin, Stephen A.; Rezaeian, Sanaz; Rowshandel, Badie; Seyhan, Emel; Shahi, Shrey; Shantz, Tom; Silva, Walter; Spudich, Paul A.; Stewart, Jonathan P.; Watson-Lamprey, Jennie; Wooddell, Kathryn; Youngs, Robert

    2014-01-01

    The NGA-West2 project is a large multidisciplinary, multi-year research program on the Next Generation Attenuation (NGA) models for shallow crustal earthquakes in active tectonic regions. The research project has been coordinated by the Pacific Earthquake Engineering Research Center (PEER), with extensive technical interactions among many individuals and organizations. NGA-West2 addresses several key issues in ground-motion seismic hazard, including updating the NGA database for a magnitude range of 3.0–7.9; updating NGA ground-motion prediction equations (GMPEs) for the “average” horizontal component; scaling response spectra for damping values other than 5%; quantifying the effects of directivity and directionality for horizontal ground motion; resolving discrepancies between the NGA and the National Earthquake Hazards Reduction Program (NEHRP) site amplification factors; analysis of epistemic uncertainty for NGA GMPEs; and developing GMPEs for vertical ground motion. This paper presents an overview of the NGA-West2 research program and its subprojects.

  5. Assessment of Pronghorn movements and strategies to promote highway permeability : US Highway 89.

    Science.gov (United States)

    2010-05-01

    Pronghorn (Antilocapra americana) movements were investigated with Global Position System (GPS) : telemetry from 2007 to 2008 along a 28-mile stretch of U.S. Highway 89 in northern Arizona to develop : strategies to enhance permeability with future h...

  6. Highways: Interstate, US & State

    Data.gov (United States)

    Earth Data Analysis Center, University of New Mexico — This dataset contains lines for all highways in the state of New Mexico. It is in a vector digital data structure digitized from a USGS 1:500,000 scale map of the...

  7. The IT project manager competencies that impact project success – A qualitative research

    Directory of Open Access Journals (Sweden)

    Cíntia Cristina Silva de Araújo

    2015-07-01

    Full Text Available Since there is a lack of studies about the relationship of IT project manager competencies and project success, this paper will address the following research question: Which competencies should IT project managers develop in order to achieve success in IT projects? To answer this question, we conducted a qualitative research with an exploratory approach. To collect data, twelve (12 in-depth interviews were done with Brazilian project managers from different companies from several business sectors. The analysis results pointed out that for our respondents the most needed category of competencies are team management, business domain knowledge,  communication, project management and people skills. As other authors have affirmed, technical skills were considered to be less relevant to project success than interpersonal and intrapersonal competencies.

  8. Jmol-Enhanced Biochemistry Research Projects

    Science.gov (United States)

    Saderholm, Matthew; Reynolds, Anthony

    2011-01-01

    We developed a protein research project for a one-semester biochemistry lecture class to enhance learning and more effectively train students to understand protein structure and function. During this semester-long process, students select a protein with known structure and then research its structure, sequence, and function. This project…

  9. Teaching/Research Project "Wheelmap"

    Science.gov (United States)

    Gollenstede, Andreas

    2018-05-01

    In recent years new didactic concepts and approaches have been developed and evaluated at the universities. The concept for cartography lectures presented in this article is based on the close link of research and teaching/learning. The students are involved in all essential steps of a scientific project taking place during a series of lectures - beginning with the development of the scientific issues, followed by the choice and execution of the research methods and finally the presentation of the achieved outcomes. The specific project introduced here is based on self-experiments in which students took the perspective of wheelchair users entrusted with the task to map places, which are accessible for people with impairments. Among others, the goal set for the students was to develop an appropriate concept for the mobile acquisition of data and to visualise the final results by different methods of cartography.

  10. Utilizing the energy from induced wind produce by highway vehicle motion

    International Nuclear Information System (INIS)

    Abas Abd Wahab; Tong, C.W.

    2000-01-01

    A research work has been conducted at the Faculty of mechanical Engineering, Universiti Teknologi Malaysia to utilize energy from airflow induced by moving vehicles along the highway for advertising and signboard lighting. Series of data collections have been made at Km 20 Johor Bahru - Kuala Lumpur Plus Highway. Wind anemometer equipped with data recorder has been placed at the highway divider to measure the wind speed induced by the vehicles moving from Johor Bahru to Kuala Lumpur and vice versa. From the data analysis it has been found that the to and from Kuala Lumpur motion of the vehicles induced a stable and continuous source of airflow (wind) ranges from 2 to 4 m/s. The energy in this induced wind has been estimated and has the potential to be used for the above said purpose. Five design models have been tested in the Faculty of mechanical Engineering Low Speed Wind Tunnel and the twisted vertical blades with circular end covers has proven to be the most efficient and suitable. The optimum sizing of the vertical axis wind turbine has also been determined. The details of the collection of wind induced data and analysis, estimation of energy content, the vertical axis wind turbine models testing and results are presented in this paper. (Author)

  11. Bio Diesel Cellulosic Ethanol Research Project

    Energy Technology Data Exchange (ETDEWEB)

    Hanlon, Edward A. [County of Hendry, FL (United States); Capece, John C. [County of Hendry, FL (United States); McAvoy, Eugene [County of Hendry, FL (United States); Hodges, Alan Wayne [County of Hendry, FL (United States); Shukla, Sanjay [County of Hendry, FL (United States); Ozores-Hamilton, Monica [County of Hendry, FL (United States); Gilbert, Rob [County of Hendry, FL (United States); Wright, Alan [County of Hendry, FL (United States); Baucum, L. [County of Hendry, FL (United States)

    2017-02-07

    The objective of the project is to create the Hendry County Sustainable Biofuels Center and initiate its research, development, and education programs. The mission is to develop engineering and economic assessment methods to evaluate the natural resources impacts of biomass farming and fuel conversion systems; provide sustainability assessments of specific biofuels productions proposals; develop biomass farming and fuel conversion systems that are compatible with south Florida ecosystem restoration priorities; create ecosystem services opportunities and structures to diversify farm income; monitor the range of research and development activities necessary to the creation of sutstainable biofuels production systems in south Florida, identify gaps in the regional research, and assist in the development and coordination of additional projects to fill out the required knowledge base; prepare the workforce of southwest Florida for employment in biofuels related professions; and assist businesses & governmental design and realize sustainable biofuels projects.

  12. A comprehensive methodology for the analysis of highway sight distance

    OpenAIRE

    Castro Malpica, María; Santos Berbel, César de; Iglesias Martínez, Luis

    2017-01-01

    As one of the main elements of geometric design, sight distance must be considered carefully for the safe and efficient operation of highways. An application developed on geographic information systems (GIS) was con-ceived for the three-dimensional estimation of sight distance on highways, as opposed to conventional two-dimensional techniques, which may underestimate or overestimate the actual visibility conditions. It is capable of computing the available sight distance of a highway section ...

  13. Integrating transit with road pricing projects.

    Science.gov (United States)

    2013-06-01

    This study examined various levels of the treatment of public transportation in conjunction with the implementation of : managed lane highway projects. It details the ranges of transit investments identified in and associated with managed : lanes tha...

  14. Tools for Monitoring Social Media: A Marketing Research Project

    Science.gov (United States)

    Veeck, Ann; Hoger, Beth

    2014-01-01

    Knowledge of how to effectively monitor social media is an increasingly valued marketing research skill. This study tests an approach for adding social media content to an undergraduate marketing research class team project. The revised project maintains the expected objectives and parameters of a traditional research project, while integrating…

  15. Needs assessment in health research projects: a new approach to project management in iran.

    Science.gov (United States)

    Peykari, Niloofar; Owlia, Parviz; Malekafzali, Hossein; Ghanei, Mostafa; Babamahmoodi, Abdolreza; Djalalinia, Shirin

    2013-01-01

    The science and technology health plan has defined the outline of health research to the national vision of Iran by 2025. The aim of this study was to focus on the process of needs assessment of health research projects also health research priority setting in Iran. THE PROJECT MANAGEMENT LIFE CYCLE HAS FOUR PHASES: Initiation, Planning, Execution and Closure. Based on abovementioned points we conducted the study. Focusing on the needs assessment led to systematic implementation of needs assessment of health project in all of the medical sciences universities. Parallel with this achieved strategies health research priority setting was followed through specific process from empowerment to implementation. We should adopt with more systematic progressive methods of health project managements for both our national convenience as well as our international health research programs.

  16. Canada's gas taxes = highway robbery

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-05-01

    This report was prepared for the second annual 'gas honesty day' (May 18, 2000) in an effort to draw attention to the frustration of Canadian taxpayers with gasoline retailers and the petroleum industry for the inordinately and unjustifiably high prices for gasoline at the pump. The report points out that the public outcry is, in fact, misdirected since the largest profiteers at the pumps, the federal government, remains largely unscathed. It is alleged in the report that gas taxes are tantamount to highway robbery. Ostensibly collected for road construction and maintenance, of the almost $ 5 billion collected in 1999, only a paltry $ 194 million was returned to the provinces for roadway and highway spending. The 10-year average of federal returns to the the provinces from tax on gasoline is a meager 4.7 per cent, which fell even further to 4.1 per cent in 1998-1999. Gasoline tax revenues continue to climb, while government commitment to real roadway and highway spending continues to decline. This document attempts to shed some light on the pricing structure for gasoline. Without defending or explaining the non-tax portion of the pump price charged by Canada's oil companies, which is a task for the oil companies to undertake, the document makes a concerted effort to raise public awareness and focus public attention on government's involvement, namely that gas taxes represent on average about 50 per cent of the pump price and that the majority of the taxes collected are not put back into road and highway improvements. The Canadian Taxpayers Federation, authors of this report, expect that by focusing debate on the issue of gasoline taxes a broad support for a lowering of the overall tax burden on motorists will result. Among other things, the CTF advocates reduction of federal and provincial fuel taxes to levels commensurate with highway funding; dedication of fuel tax revenues to highway construction and maintenance; elimination of the sales and

  17. National Automated Highway System Consortium: Modeling Stakeholder Preferences Project

    OpenAIRE

    Lathrop, John; Chen, Kan

    1997-01-01

    This document is the final report of the Modeling Stakeholder Preferences Project. The results of the project consist of three results: 1) evaluation framework; 2) focus group non-quantitative findings/ recommendations; and, 3) performance/impact measures, their endpoints, rankings and weights, for each stakeholder group.

  18. Methodology of impact assessment of research projects

    International Nuclear Information System (INIS)

    Rodriguez Cardona, R.; Cobas Aranda, M.

    2014-01-01

    In the context of the management of research projects development it is necessary to have tools to monitor and evaluate progress and the performance of the projects, as well as their results and the impact on society (international agencies of the United Nations and the States 2002 and 2005 Paris Declaration), with the objective of to ensure their contribution to the social and economic development of countries. Many organizations, agencies and Governments apply different methodologies (IDB, World Bank, UNDP, ECLAC, UNESCO; UNICEF, Canada, Japan, other) for these purposes. In the results-based project management system not only paramount is the process or product itself, but also the result or impact of the project (if the program/project produced the effects desired persons, households and institutions and whether those effects are attributable to the intervention of the program / project). The work shows a methodology that allows for a qualitative and quantitative evaluation of impact of research projects and has been result of experience in project management of international collaboration with the International Agency for Atomic Energy (IAEA) and the Cuban Nuclear programme. (author)

  19. Second-best Road Pricing Through Highway Franchising

    OpenAIRE

    Verhoef, Erik T.

    2005-01-01

    This paper considers the welfare impacts of a range of franchising regimes for congestible highways. For a single road in isolation, it is shown that a competitive auction with the level of road use as the decision criterion produces the socially optimal road (in terms of capacity and toll level) as the equilibrium outcome, provided constant returns to scale characterize highway operations. The auction outperforms various alternatives, in which the bidders are asked to minimize the toll level...

  20. A comparative empirical analysis of statistical models for evaluating highway segment crash frequency

    Directory of Open Access Journals (Sweden)

    Bismark R.D.K. Agbelie

    2016-08-01

    Full Text Available The present study conducted an empirical highway segment crash frequency analysis on the basis of fixed-parameters negative binomial and random-parameters negative binomial models. Using a 4-year data from a total of 158 highway segments, with a total of 11,168 crashes, the results from both models were presented, discussed, and compared. About 58% of the selected variables produced normally distributed parameters across highway segments, while the remaining produced fixed parameters. The presence of a noise barrier along a highway segment would increase mean annual crash frequency by 0.492 for 88.21% of the highway segments, and would decrease crash frequency for 11.79% of the remaining highway segments. Besides, the number of vertical curves per mile along a segment would increase mean annual crash frequency by 0.006 for 84.13% of the highway segments, and would decrease crash frequency for 15.87% of the remaining highway segments. Thus, constraining the parameters to be fixed across all highway segments would lead to an inaccurate conclusion. Although, the estimated parameters from both models showed consistency in direction, the magnitudes were significantly different. Out of the two models, the random-parameters negative binomial model was found to be statistically superior in evaluating highway segment crashes compared with the fixed-parameters negative binomial model. On average, the marginal effects from the fixed-parameters negative binomial model were observed to be significantly overestimated compared with those from the random-parameters negative binomial model.

  1. Analyzing the Impact of Highways Associated with Farmland Loss under Rapid Urbanization

    Directory of Open Access Journals (Sweden)

    Jie Song

    2016-06-01

    Full Text Available Highway construction has accelerated urban growth and induced direct and indirect changes to land use. Although many studies have analyzed the relationship between highway construction and local development, relatively less attention has been paid to clarifying the various impacts of highways associated with farmland loss. This paper integrates GIS spatial analysis, remote sensing, buffer analysis and landscape metrics to analyze the landscape pattern change induced by direct and indirect highway impacts. This paper explores the interaction between the impact of highways and farmland loss, using the case of the highly urbanized traffic hubs in eastern China, Hang-Jia-Hu Plain. Our results demonstrate that the Hang-Jia-Hu Plain experienced extensive highway construction during 1990–2010, with a clear acceleration of expressway development since 2000. This unprecedented highway construction has directly fragmented the regional landscape and indirectly disturbed the regional landscape by attracting a large amount of built-up land transition from farmland during the last two decades. In the highway-effect zone, serious farmland loss initially occurred in the urban region and then spread to the rural region. Moreover, we found the discontinuous expansion of built-up land scattered the farmland in the rural region and expressway-effect zone. Furthermore, farmland protection policies in the 1990s had the effect of controlling the total area of farmland loss. However, the cohesive farmland structure was still fragmented by the direct and indirect impacts of highway construction. We suggest that an overall farmland protection system should be established to enhance spatial control and mitigate the adverse impacts caused by highway construction. This work improves the understanding of regional sustainable development, and provides a scientific basis for balanced urban development with farmland protection in decision-making processes.

  2. Highway-Rail Crossings Inventory Data

    Data.gov (United States)

    Department of Transportation — The entire National Highway-Rail Crossing Inventory is available in three separate downloadble files. There is a file of all current Public-at-Grade crossings. There...

  3. Basic research projects

    International Nuclear Information System (INIS)

    1979-04-01

    The research programs under the cognizance of the Office of Energy Research (OER) are directed toward discovery of natural laws and new knowledge, and to improved understanding of the physical and biological sciences as related to the development, use, and control of energy. The ultimate goal is to develop a scientific underlay for the overall DOE effort and the fundamental principles of natural phenomena so that these phenomena may be understood, and new principles, formulated. The DOE-OER outlay activities include three major programs: High Energy Physics, Nuclear Physics, and Basic Energy Sciences. Taken together, these programs represent some 30 percent of the Nation's Federal support of basic research in the energy sciences. The research activities of OER involve more than 6,000 scientists and engineers working in some 17 major Federal Research Centers and at more than 135 different universities and industrial firms throughout the United States. Contract holders in the areas of high-energy physics, nuclear physics, materials sciences, nuclear science, chemical sciences, engineering, mathematics geosciences, advanced energy projects, and biological energy research are listed. Funding trends for recent years are outlined

  4. Modeling Research Project Risks with Fuzzy Maps

    Science.gov (United States)

    Bodea, Constanta Nicoleta; Dascalu, Mariana Iuliana

    2009-01-01

    The authors propose a risks evaluation model for research projects. The model is based on fuzzy inference. The knowledge base for fuzzy process is built with a causal and cognitive map of risks. The map was especially developed for research projects, taken into account their typical lifecycle. The model was applied to an e-testing research…

  5. RESOURCE SAVING IN CONSTRUCTION INDUSTRY WITH HIGHWAY BRANCH AS EXAMPLE

    Directory of Open Access Journals (Sweden)

    A. V. Roudensky

    2011-01-01

    Full Text Available Consumption of energy is an objective (independent on cost fluctuations technical efficiency criterion of any construction or repair work. Highway/road (particularly bituminous pavement sector is an important construction industry part. Bituminous road pavement construction consists of such components as excavation and preparation of basic materials, manufacture of mixes, ready mix laying/compacting and transportation of all materials. Average energy consumption for every bituminous pavement construction component is assessed. Approach to resource and energy saving presented in the article may be used in construction industry to develop and implement innovativetechnical and organizational solutions both of general application and for individual projects.

  6. 28 CFR 512.20 - Publication of results of research project.

    Science.gov (United States)

    2010-07-01

    ... project. 512.20 Section 512.20 Judicial Administration BUREAU OF PRISONS, DEPARTMENT OF JUSTICE GENERAL MANAGEMENT AND ADMINISTRATION RESEARCH Research § 512.20 Publication of results of research project. (a) A researcher may publish in book form and professional journals the results of any research project conducted...

  7. Highway route controlled quantity shipment routing reports - An overview

    International Nuclear Information System (INIS)

    Cashwell, J.W.; Welles, B.W.; Welch, M.J.

    1989-01-01

    US Department of Transportation (DOT) regulations require a postnotification report from the shipper for all shipments of radioactive materials categorized as a Highway Route Controlled Quantity. These postnotification reports, filed in compliance with 49 CFR 172.203(d), have been compiled by the DOT in a database known as the Radioactive Materials Routing Report (RAMRT) since 1982. The data were sorted by each of its elements to establish historical records and trends of Highway Route Controlled Quantity shipments from 1982 through 1987. Approximately 1520 records in the RAMRT database were compiled for this analysis. Approximately half of the shipments reported for the study period were from the US Department of Energy (DOE) and its contractors, with the others being commercial movements. Two DOE installations, EG and G Idaho and Oak Ridge, accounted for nearly half of the DOE activities. Similarly, almost half of the commercial movements were reported by two vendors, Nuclear Assurance Corporation and Transnuclear, Incorporated. Spent fuel from power and research reactors accounted for approximately half of all shipments

  8. Math Fact Strategies Research Project

    Science.gov (United States)

    Boso, Annie

    2011-01-01

    An action research project was conducted in order to determine effective math fact strategies for first graders. The traditional way of teaching math facts included using timed tests and flashcards, with most students counting on their fingers or a number line. Six new research-based strategies were taught and analyzed to decide which methods…

  9. Feasibility of shoulder use for highway work zone optimization

    Directory of Open Access Journals (Sweden)

    Bo Du

    2014-08-01

    Full Text Available Highway maintenance, often requiring lane closure, is very expensive in terms of the costs associated with transportation agencies (i. e. work zone setups and road users (i. e. delay. Longer work zones tend to increase the user delay but will be efficient because of fewer repeated setups. To increase road capacity and mitigate congestion impact for a short-term work zone, temporary shoulder use may be applied. This study develops an analytical model to optimize work zone length on a multi-lane highway considering time-varying traffic volume and road capacity affected by light condition, heavy vehicle percentage, and lane width. The results can be used to evaluate the work zone impact (i. e. delay and cost and assist engineers/planners to prepare and develop a cost-effective highway maintenance plan. A case study for a highway work zone in New Jersey has been conducted, in which the optimized solution is found. A guideline of using road shoulder under various circumstances is developed.

  10. Methodology and significance of studies of atmospheric deposition in highway runoff

    Science.gov (United States)

    Colman, John A.; Rice, Karen C.; Willoughby, Timothy C.

    2001-01-01

    Atmospheric deposition and the processes that are involved in causing and altering atmospheric deposition in relation to highway surfaces and runoff were evaluated nationwide. Wet deposition is more easily monitored than dry deposition, and data on wet deposition are available for major elements and water properties (constituents affecting acid deposition) from the inter-agency National Atmospheric Deposition Program/ National Trends Network (NADP/NTN). Many trace constituents (metals and organic compounds) of interest in highway runoff loads, however, are not included in the NADP/NTN. Dry deposition, which constitutes a large part of total atmospheric deposition for many constituents in highway runoff loads, is difficult to monitor accurately. Dry-deposition rates are not widely available.Many of the highway-runoff investigations that have addressed atmospheric-deposition sources have had flawed investigative designs or problems with methodology. Some results may be incorrect because of reliance on time-aggregated data collected during a period of changing atmospheric emissions. None of the investigations used methods that could accurately quantify the part of highway runoff load that can be attributed to ambient atmospheric deposition. Lack of information about accurate ambient deposition rates and runoff loads was part of the problem. Samples collected to compute the rates and loads were collected without clean-sampling methods or sampler protocols, and without quality-assurance procedures that could validate the data. Massbudget calculations comparing deposition and runoff did not consider loss of deposited material during on-highway processing. Loss of deposited particles from highway travel lanes could be large, as has been determined in labeled particle studies, because of resuspension caused by turbulence from passing traffic. Although a cause of resuspension of large particles, traffic turbulence may increase the rate of deposition for small particles and

  11. The study for installing noise barrier on highway route no.9

    Directory of Open Access Journals (Sweden)

    Jiradecha Chaddanai

    2018-01-01

    Full Text Available Highway Route No. 9 is a Bangkok bypass motorway that aims to alleviate traffic congestion in greater Bangkok areas. Presently, it is found a rapid expansion of new communities residing along both side of Highway No. 9. To lessen the noise level, Department of Highways installed the noise barrier on the sensitive locations. However, people from communities living on both sides of highway still demand some additional noise pollution improvement. To improve the efficiency of using noise barriers and to promote environmental and social quality for the people on the sensitive communities along the highway route, the Department of Highways, therefore, designs a new technique for installing noise barrier on the sensitive areas, i.e. education institutions, temple, residential area. In addition, the mathematic model is applied to 12 selected locations of sensitive areas for monitoring the effectiveness of the new installation technique. The mathematic model is used for predict the future noise level after installation of noise barrier in year 2037. The results confirm that the appropriate height and width of noise barrier can improve the comfortable of the people on the sensitive area.

  12. Overview of research in the ADVANTAGE project

    DEFF Research Database (Denmark)

    Angjelichinoski, Marko; Cosovic, Mirsad; Kalalas, Charalampos

    2016-01-01

    The European Marie Curie Project ADVANTAGE (Advanced Communications and Information processing in smart grid systems) was launched in 2014. It represents a major inter-disciplinary research project into the topic of Smart Grid technology. A key aspect of the project is to bring together and train...

  13. Basic Project Management Methodologies for Survey Researchers.

    Science.gov (United States)

    Beach, Robert H.

    To be effective, project management requires a heavy dependence on the document, list, and computational capability of a computerized environment. Now that microcomputers are readily available, only the rediscovery of classic project management methodology is required for improved resource allocation in small research projects. This paper provides…

  14. CAMAC serial highway interface for the LSI-11

    International Nuclear Information System (INIS)

    Lau, N.H.

    1980-01-01

    A CAMAC Serial Highway Interface has been designed for the Local Control and Instrumentation System of the Mirror Fusion Test Facility. There are over 50 distinguishable systems in the facility, each of which consists of the LSI-11 computer, fiber optic communication links, and the CAMAC system. The LSI-11 computer includes a 32k memory, serial modem interface and the CAMAC Serial Highway Interface

  15. 40 CFR 93.126 - Exempt projects.

    Science.gov (United States)

    2010-07-01

    ... transportation buildings, structures, or facilities). Repair of damage caused by natural disasters, civil unrest... location or feature. Safer non-Federal-aid system roads. Shoulder improvements. Increasing sight distance... than signalization projects. Railroad/highway crossing warning devices. Guardrails, median barriers...

  16. New York State Energy Research and Development Authority. Research projects` update project status as of March 31, 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-01

    This report provides an update of the New York State Energy Research and Development Authority (NYSERDA) program. The NYSERDA research and development program has five major areas: industry, buildings, energy resources, transportation, and environment. NYSERDA organizes projects within these five major areas based on energy use and supply, and end-use sectors. Therefore, issues such as waste management, energy products and renewable energy technologies are addressed in several areas of the program. The project descriptions presented are organized within the five program areas. Descriptions of projects completed between the period April 1, 1996, and March 31, 1997, including technology-transfer activities, are at the end of each subprogram section.

  17. Simple Tools to Facilitate Project Management of a Nursing Research Project.

    Science.gov (United States)

    Aycock, Dawn M; Clark, Patricia C; Thomas-Seaton, LaTeshia; Lee, Shih-Yu; Moloney, Margaret

    2016-07-01

    Highly organized project management facilitates rigorous study implementation. Research involves gathering large amounts of information that can be overwhelming when organizational strategies are not used. We describe a variety of project management and organizational tools used in different studies that may be particularly useful for novice researchers. The studies were a multisite study of caregivers of stroke survivors, an Internet-based diary study of women with migraines, and a pilot study testing a sleep intervention in mothers of low-birth-weight infants. Project management tools were used to facilitate enrollment, data collection, and access to results. The tools included protocol and eligibility checklists, event calendars, screening and enrollment logs, instrument scoring tables, and data summary sheets. These tools created efficiency, promoted a positive image, minimized errors, and provided researchers with a sense of control. For the studies described, there were no protocol violations, there were minimal missing data, and the integrity of data collection was maintained. © The Author(s) 2016.

  18. A study on traffic weaving segment level of service on Malaysia urban highway

    Science.gov (United States)

    Abdullah, Rohaya; Sadullah, Ahmad Farhan Mohd

    2017-07-01

    The objective of this research is to observe weaving problems, analyze the capacity of the weaving segment and to identify the behavior of the Malaysian driver at urban freeway weaving segment. Field data collected during non - peak hours at km. 138.6-138.2 (north bound) Seberang Jaya: Penang Bridge, km.16.8 to km.17.0 Sunway Mentari: Damansara-Puchong Highway and km.21.4 to km.21.9 Puchong Intan: Damansara-Puchong Highway. These segments behave as a bottleneck during peak hour. The data collected are traffic volume, vehicle composition and the road geometry. The drivers behavior pattern at the freeway weaving segment is observed. This research analyses by two different methodologies, the first analysis is by referring to the US Highway Capacity Manual 2010 and the second analysis through a modified method to suit the local traffic composition. The consideration of motorcycle and light heavy vehicle in the analysis lead to a different evaluation of weaving segment capacity. The analysis results show a slight difference between both methods. LOS, weaving speed and density prediction by the modified method is slightly higher than the HCM method. These results, suggest that the numbers of light heavy vehicle and motorcycle contribute to the amount of traffic volume because the value factors of Passenger Car Equivalent (PCE). The adoption of the widely used method without taking consideration of local traffic condition, might lead to improper road planning or design or road operation management.

  19. 23 CFR 1.3 - Federal-State cooperation; authority of State highway departments.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Federal-State cooperation; authority of State highway... MANAGEMENT AND ADMINISTRATION GENERAL § 1.3 Federal-State cooperation; authority of State highway departments... State in all matters relating to, and to enter into, on behalf of the State, all contracts and...

  20. Understanding the selection processes of public research projects

    NARCIS (Netherlands)

    Materia, V.C.; Pascucci, S.; Kolympiris, C.

    2015-01-01

    This paper analyses factors that affect the funding of agricultural research projects by regional governments and other regional public authorities. We study the selection process of agricultural research projects funded by the emilia Romagna regional government in Italy, which follows funding

  1. Zoning of highway flood-triggering environment for highway in Fuling District, Chongqing

    Science.gov (United States)

    Qin, Qing-mei; Tang, Hong-mei; Chen, Hong-kai

    2011-10-01

    Based on the geological environment about Fuling district in Chongqing city, eight evaluating indicators on road flooding subsequently environment along the highway: geological disasters developmental condition, rainstorm intensity, flood frequency, landform condition, litho-logical condition, average annual rainfall, vegetation coverage and geological structure, have been chosen. Adopting expert system to double evaluation and using the analysis hierarchy process to confirm the weight of index, accordingly, the mathematical model of evaluation on subsequently environment is put forward. On the support of GIS, grid subsequently environmental index and township administrative division subsequently environmental index, subsequently environment is divided into 4 degrees. They are dangerous zone, high susceptible zone, middle susceptible zone and low susceptible zone of the floods subsequently environment around highway. The results of the study indicate that in the total area, dangerous zone, high susceptible zone, middle susceptible zone and low susceptible zone of road flooding are 11.89%, 41.65%, 32.20% and 14.26% respectively. The results provide some significant scientific evidence for the further risk evaluation of road flooding.

  2. Influences of high-flow events on a stream channel altered by construction of a highway bridge: A case study

    Science.gov (United States)

    Hedrick, Lara B.; Welsh, Stuart A.; Anderson, James T.

    2009-01-01

    Impacts of highway construction on streams in the central Appalachians are a growing concern as new roads are created to promote tourism and economic development in the area. Alterations to the streambed of a first-order stream, Sauerkraut Run, Hardy County, WV, during construction of a highway overpass included placement and removal of a temporary culvert, straightening and regrading of a section of stream channel, and armourment of a bank with a reinforced gravel berm. We surveyed longitudinal profiles and cross sections in a reference reach and the altered reach of Sauerkraut Run from 2003 through 2007 to measure physical changes in the streambed. During the four-year period, three high-flow events changed the streambed downstream of construction including channel widening and aggradation and then degradation of the streambed. Upstream of construction, at a reinforced gravel berm, bank erosion was documented. The reference section remained relatively unchanged. Knowledge gained by documenting channel changes in response to natural and anthropogenic variables can be useful for managers and engineers involved in highway construction projects.

  3. Proposal for a New Model for Highway Records in the Republic of Croatia

    Directory of Open Access Journals (Sweden)

    Rinaldo Paar

    2012-05-01

    Full Text Available Highways are public roads, whose function is to integrate Croatia in the European transport system, link the regions of Croatia and facilitate transit traffic. They are public property for general use, owned by the Republic of Croatia, and they cannot be the subject of acquisition or other proprietary rights of any kind. Today, there are two types of highway record-keeping. The first is conducted by leading companies authorised to manage highways in order to develop a highway database, or create a highway register. The second is conducted by land-management systems; the Cadastre and Land Registry. They are the official public registers for keeping records of land plots, buildings and other structures, and their ownership. Procedures that need to be implemented in the second type of record-keeping often get "stuck" in practice. Based on the problems identified in this model and an analysis of the state of record-keeping, a proposal for a new model for highway records in the Cadastre and Land Registry is given. Keywords: highways; building plot; expropriation; record; Cadastre; Land Registry

  4. By ship, by barge, by truck : massive Kearl modules to take a new route from South Korea to Alberta via Idaho and Montana highways

    Energy Technology Data Exchange (ETDEWEB)

    Jaremko, D.

    2010-03-15

    Idaho and Montana highways will be used to transport massive oil sands modules for Imperial Oil's Kearl oilsands project. A test module will pass through the states in mid 2010. The local highway patrol will be contracted as an escort in order to reduce the risk of incidents with local drivers. The modules will be shipped from South Korea to Portland and then transported by barge to Lewiston, Idaho. The modules will then be loaded onto trucks and transported along the highway. It will take approximately 10 days to move the modules to the Kearl site near Fort McMurray, Alberta. The loads are so large that they will not fit through rail tunnels or highway overpasses. Imperial Oil will be required to bury some overhead power transmission lines and build approximately 100 pullouts along the route. Traffic signal arms will also be modified to swing out of the way as the loads are passing through. Construction of the Kearl site will be completed by 2012. 2 figs.

  5. Evolution of project management research: a bibliometric study of International Journal of Project Management

    Directory of Open Access Journals (Sweden)

    Fábio Cocchi da Silva Eiras

    2017-03-01

    Full Text Available Over the past decades, the project management field has evolved and consolidated. Facing this growth, this research aims to identify the main trends of research in the area, as well as providing an overview of publications, identifying new issues, changes in approaches and the development of knowledge areas. To do so, a systematic review of the literature was performed with the use of bibliometric study in the papers of the International Journal of Project Management (IJPM, included in SCOPUS, from its first volume to 2015, covering a period of more than 30 years. It was found that developing countries are increasingly concerned in developing research into the field of project management, especially in mega infrastructure projects and public-private partnerships. The risk is a central topic in all periods of analysis, however, the strategic topics such as success in project and portfolio management are among the fastest growing. Issues related to the soft side of project management as skills, culture, and knowledge management have emerged in recent periods. According to the industry, construction projects and projects in information technology are the most studied along the period analysed.

  6. A ProCoS II Project Final Report: ESPRIT Basic Research project 707

    DEFF Research Database (Denmark)

    Bowen, J. P.; Hoare, C. A. R.; Langmaack, Hans

    1996-01-01

    An overview of the research and associated activities of the Europeancollaborative ESPRIT Basic Research ProCoS II project (no. 7071) on``Provably Correct Systems'' which ran from 1992 to 1995 is presented.This was a follow-on project to ProCoS (no. 3104) and ran inparallel with the ProCoS Working...

  7. Friction testing for the National Highway System for 2001 : all Louisiana districts : technical assistance report.

    Science.gov (United States)

    2002-11-01

    This report contains the results of friction testing conducted by the pavement/systems group of the Louisiana Transportation Research Center (LTRC) on the National Highway System (NHS) in 2000 and 2001. The data contained in this report covers all Lo...

  8. Natural ventilation without air breathing in the top openings of highway tunnels

    Science.gov (United States)

    Jin, Sike; Jin, Jiali; Gong, Yanfeng

    2017-05-01

    A number of urban shallow-buried highway tunnels have been built in China. Despite much better internal air quality compared to the traditional tunnels, there is no sufficient theoretical ground or experimental support for the construction of such tunnels. Most researchers hold that natural ventilation in such tunnels depends on air breathing in the top openings, but some others are skeptical about this conclusion. By flow visualization technology on a tunnel experiment platform, we tested the characteristics of airflow in the top openings of highway tunnels. The results showed that air always flowed from outside to inside in all top openings above a continuous traffic stream, and the openings did not breathe at all. In addition, intake air in the top openings reached its maximum velocity at the tunnel entrance, and then gradually slowed down with tunnel depth increasing.

  9. The Research of Stakeholder Power Impact on Project Implementation

    Directory of Open Access Journals (Sweden)

    Artur Biskupek

    2016-12-01

    Full Text Available Purpose of the article: The article show summarized information about stakeholders and their role in project implementation based on literature review. The second part of the article is dedicated for the research about stakeholder influence on project implementation. The only condition to participate in the survey was managing projects. Although the respondents are employed in the area of south Poland, they implement projects all over Poland. The research tool was a questionnaire which was sent by e-mail to the respondents. 90 project managers from the area of south Poland were invited to join the project, and 62 people sent back a completed questionnaire. Methodology/methods: The research was done by a questionnaire with twenty two question, which was divided into three parts. The first part was the imprint, which consisted of three questions. The second part consisted of two questions, which concerned the way of defining the word “stakeholder”. The third part concerned the topic of the research and consisted of seventeen questions. Scientific aim: The aim of the article is presenting the results of the research which was done, to show the research results of project stakeholder influence on the project implementation. Findings: The results received from the survey in the process of analysis and interpretation allow to put forward a thesis that stakeholders as a whole group are significant for the implementation of the whole project. Their impact is so important that it is possible to tell that they decide also about the project success or failure. Conclusions: The respondents show that stakeholders affect every area in large extent or very big extent. The fact has been proved in table 1 which shows the most frequently chosen answers by responders. However, by conducted analysis by the standard deviation it is possible to see a large dispersion of the results.

  10. AVST Morphing Project Research Summaries in Fiscal Year 2001

    Science.gov (United States)

    McGowan, Anna-Maria R.

    2002-01-01

    The Morphing project at the National Aeronautics and Space Agency's Langley Research Center is part of the Aerospace Vehicle Systems Program Office that conducts fundamental research on advanced technologies for future flight vehicles. The objectives of the Morphing project are to develop and assess advanced technologies and integrated component concepts to enable efficient, multi-point adaptability in air and space vehicles. In the context of the project, the word "morphing" is defined as "efficient, multi-point adaptability" and may include micro or macro, structural or fluidic approaches. The current document on the Morphing project is a compilation of research summaries and other information on the project from fiscal year 2001. The focus of this document is to provide a brief overview of the project content, technical results and lessons learned from fiscal year 2001.

  11. Evaluating aggregate terrestrial impacts of road construction projects for advanced regional mitigation.

    Science.gov (United States)

    Thorne, James H; Girvetz, Evan H; McCoy, Michael C

    2009-05-01

    This study presents a GIS-based database framework used to assess aggregate terrestrial habitat impacts from multiple highway construction projects in California, USA. Transportation planners need such impact assessment tools to effectively address additive biological mitigation obligations. Such assessments can reduce costly delays due to protracted environmental review. This project incorporated the best available statewide natural resource data into early project planning and preliminary environmental assessments for single and multiple highway construction projects, and provides an assessment of the 10-year state-wide mitigation obligations for the California Department of Transportation. Incorporation of these assessments will facilitate early and more strategic identification of mitigation opportunities, for single-project and regional mitigation efforts. The data architecture format uses eight spatial scales: six nested watersheds, counties, and transportation planning districts, which were intersected. This resulted in 8058 map planning units statewide, which were used to summarize all subsequent analyses. Range maps and georeferenced locations of federally and state-listed plants and animals and a 55-class landcover map were spatially intersected with the planning units and the buffered spatial footprint of 967 funded projects. Projected impacts were summarized and output to the database. Queries written in the database can sum expected impacts and provide summaries by individual construction project, or by watershed, county, transportation district or highway. The data architecture allows easy incorporation of new information and results in a tool usable without GIS by a wide variety of agency biologists and planners. The data architecture format would be useful for other types of regional planning.

  12. Evaluating Aggregate Terrestrial Impacts of Road Construction Projects for Advanced Regional Mitigation

    Science.gov (United States)

    Thorne, James H.; Girvetz, Evan H.; McCoy, Michael C.

    2009-05-01

    This study presents a GIS-based database framework used to assess aggregate terrestrial habitat impacts from multiple highway construction projects in California, USA. Transportation planners need such impact assessment tools to effectively address additive biological mitigation obligations. Such assessments can reduce costly delays due to protracted environmental review. This project incorporated the best available statewide natural resource data into early project planning and preliminary environmental assessments for single and multiple highway construction projects, and provides an assessment of the 10-year state-wide mitigation obligations for the California Department of Transportation. Incorporation of these assessments will facilitate early and more strategic identification of mitigation opportunities, for single-project and regional mitigation efforts. The data architecture format uses eight spatial scales: six nested watersheds, counties, and transportation planning districts, which were intersected. This resulted in 8058 map planning units statewide, which were used to summarize all subsequent analyses. Range maps and georeferenced locations of federally and state-listed plants and animals and a 55-class landcover map were spatially intersected with the planning units and the buffered spatial footprint of 967 funded projects. Projected impacts were summarized and output to the database. Queries written in the database can sum expected impacts and provide summaries by individual construction project, or by watershed, county, transportation district or highway. The data architecture allows easy incorporation of new information and results in a tool usable without GIS by a wide variety of agency biologists and planners. The data architecture format would be useful for other types of regional planning.

  13. Analyses of Lattice Traffic Flow Model on a Gradient Highway

    International Nuclear Information System (INIS)

    Gupta Arvind Kumar; Redhu Poonam; Sharma Sapna

    2014-01-01

    The optimal current difference lattice hydrodynamic model is extended to investigate the traffic flow dynamics on a unidirectional single lane gradient highway. The effect of slope on uphill/downhill highway is examined through linear stability analysis and shown that the slope significantly affects the stability region on the phase diagram. Using nonlinear stability analysis, the Burgers, Korteweg-deVries (KdV) and modified Korteweg-deVries (mKdV) equations are derived in stable, metastable and unstable region, respectively. The effect of reaction coefficient is examined and concluded that it plays an important role in suppressing the traffic jams on a gradient highway. The theoretical findings have been verified through numerical simulation which confirm that the slope on a gradient highway significantly influence the traffic dynamics and traffic jam can be suppressed efficiently by considering the optimal current difference effect in the new lattice model. (nuclear physics)

  14. Relationship Between Accumulation and Influx of Pollutants in Highway Ponds

    DEFF Research Database (Denmark)

    Bentzen, Thomas Ruby; Larsen, Torben; Rasmussen, Michael R.

    The paper discusses the long term mass balance of pollutants in highway ponds. The accumulations of five polycyclic aromatic hydrocarbons (PAHs) and six heavy metals have been measured in eight Danish detention ponds, which receive runoff from highways only. For each pollutant the accumulation has...... been compared to the long-term influx, estimated from short-term measurements of concentrations in highway runoff. The results show that a large proportion of the incoming heavy metals in short-term runoff events has accumulated in the ponds. This is not the case for the toxic organic compounds....... The results also show that the accumulation rates for the heavy metals depend significantly on the relative pond area (pond area divided by catchment area). The conclusion is that the mass balances of heavy metals and PAHs in highway ponds can be estimated with acceptable accuracy from a combination of short...

  15. Energy harvesting on highway bridges.

    Science.gov (United States)

    2011-01-01

    A concept for harvesting energy from the traffic-induced loadings on a highway bridge using piezoelectric : materials to generate electricity was explored through the prototype stage. A total of sixteen lead-zirconate : titanate (PZT) Type 5A piezoel...

  16. Renewable Energy Research & Development

    Energy Technology Data Exchange (ETDEWEB)

    Jicarilla Apache Tribe

    2003-04-01

    The Jicarilla Apache Nation is in Rio Arriba County in North Central New Mexico. The photovoltaic project was installed at the Dulce High School in the town of Dulce. Dulce is in the most northern part of the reservation near the New Mexico/Colorado boundary and can be reached from the New Mexico State Capitol in Santa Fe, hence to the town of Chama along U.S. Highway 84 to the junction of U.S. Highway 64. Dulce is about 12 miles west of the junction along U.S. Highway 64. Dulce community is in the mountainous part of the Nation with a population of about 4000. No industry exists in the community, however, a few commercial sites do exist such as a motel, restaurants, gas stations, food and liquor stores.

  17. Integrating System Dynamic and Fuzzy Logic for Economic Assessment of BOT Projects

    Directory of Open Access Journals (Sweden)

    Farnad Nasirzadeh

    2016-03-01

    Full Text Available The selection of the most appropriate project for the investment is one of the most important decisions that should be made by the private investors. This problem is of vital importance in BOT projects, where the total investment as well as the investor's profit should be recovered by the project's income. There are several approaches proposed by the researchers to determine the best economical project in comparison to other projects. The previous researches, however, faced with some major defects. As an example, the effects of various factors affecting the project evaluation process as well as the existing risks and uncertainties are not taken into account. In this research, economic assessment of BOT projects is performed by integrating system dynamic simulation approach and fuzzy logic. For this purpose, first the project's NPV is modeled considering all the influencing factors qualitatively. The relationships that exist between different factors are then determined and the quantitative model is built. Using the developed model, the value of NPV is simulated considering the effects of all the influencing factors and the existing uncertainties. Finally, the value of project's NPV is determined as a triangular fuzzy number. Finally, the best alternative project is selected by comparing the simulated values of NPV. To evaluate the capabilities and performance of the proposed model, the project economical evaluation is performed for two highway projects and the best project is selected.

  18. Managing environmental enhancement plans for individual research projects at a national primate research center.

    Science.gov (United States)

    Thom, Jinhee P; Crockett, Carolyn M

    2008-05-01

    We describe a method for managing environmental enhancement plans for individual research projects at a national primate research center where most monkeys are assigned to active research projects. The Psychological Well-being Program (PWB) at the University of Washington National Primate Research Center developed an Environmental Enhancement Plan form (EEPL) that allows PWB to quantify and track changes in enrichment allowances over time while ensuring that each animal is provided with as much enrichment as possible without compromising research. Very few projects involve restrictions on toys or perches. Some projects have restrictions on food treats and foraging, primarily involving the provision of these enrichments by research staff instead of husbandry staff. Restrictions are not considered exemptions unless they entirely prohibit an element of the University of Washington Environmental Enhancement Plan (UW EE Plan). All exemptions must be formally reviewed and approved by the institutional animal care and use committee. Most exemptions from elements of the UW EE Plan involve social housing. Between 2004 and 2006, the percentage of projects with no social contact restrictions increased by 1%, but those prohibiting any tactile social contact declined by 7%, and projects permitting tactile social contact during part of the study increased by 9%. The EEPL form has facilitated informing investigators about the enrichment their monkeys will receive if no restrictions or exemptions are requested and approved. The EEPL form also greatly enhances PWB's ability to coordinate the specific enrichment requirements of a project.

  19. Advanced Energy Projects FY 1990 research summaries

    International Nuclear Information System (INIS)

    1990-09-01

    This report serves as a guide to prepare proposals and provides summaries of the research projects active in FY 1990, sponsored by the Office of Basic Energy Sciences Division of Advanced Energy Projects, Department of Energy. (JF)

  20. 7 CFR 932.45 - Production research and marketing research and development projects.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Production research and marketing research and....45 Production research and marketing research and development projects. (a) The following activities... Secretary, establish or provide for the establishment of production research, and marketing research and...

  1. STUK research projects 1998-2000; Saeteilyturvakeskuksen tutkimushankkeet 1998-2000

    Energy Technology Data Exchange (ETDEWEB)

    Salomaa, S; Eloranta, E; Heimbuerger, H; Jokela, K; Jaervinen, H

    1998-07-01

    The primary goal of STUK, the Finnish Radiation and Nuclear Safety Authority, is to prevent and limit the harmful effects of radiation. The research conducted by STUK yields new information related to the use, occurrence and effects of radiation and promotes the supervision of nuclear safety. STUK research projects 1998 - 2000 summarizes STUK`s own research projects and commissioned research designed to promote the supervision of nuclear safety. Information on the research projects and related publications is also available on STUK`s WWW pages at www.stuk.fi. The work done on the safe use of nuclear power and nuclear waste management mainly comprises commissioned research projects which derive from the needs of authorities, and are funded and directed by STUK. This research is conducted by organizations outside STUK, but supervised by STUK experts. In some cases, STUK personnel are also involved. The goal of this research work is to produce the information needed for decision-making, to develop supervisory methods and to ensure that recent developments in science and technology are taken into account in action to promote safe use of nuclear power. STUK`s own research focuses on radiation protection and the health effects of radiation. During 1998 - 2000, the main emphasis will be on projects supporting the Finnish national environmental health action plan, the health risks of radiation, emergency preparedness and cooperation with neighbouring CEE areas. EU directives on radiation protection and medical exposure to radiation also influence the course taken by research carried out at STUK. STUK`s research activities are now more international than ever; the institute is involved in more then 20 research projects funded by EU. Apart from the EU and the Nordic countries, STUK`s main partners are to be found in Russia, Estonia and the USA. (orig.)

  2. [Effect of highway driving on the health of factory workers].

    Science.gov (United States)

    Uramoto, Hidetaka

    2008-06-01

    Commuting transportation is one of the important factors in the administration of safety management in industries. Most workers commute to work by car and are certain to make use of highways, mainly because of the special condition of factory locations. In this study, we investigated the effect of communicating by car on the health of factory workers. The proportion of males was significantly higher in the highway (HW) group than in the non-highway (NHW) group, and the former was younger than the latter. BMI, systolic blood pressure, diastolic blood pressure, and total cholesterol deteriorated significantly in the NHW group after 5-year periodic medical checkups. However, in the HW group, those factors did not change except for systolic blood pressure and significant improvements in triglyceride. The percentage of those who follow a good lifestyle regarding excise and nutrition, and have a solution for stress, was lower in the HW group than in the NHW group. Nevertheless, the percentage of those who did not feel stress was significantly higher in the HW group than in the NHW group, suggesting a stress-relieving effect of highway driving. Highway driving might have an unexpectedly good impact on the health of factory workers.

  3. Mathematical model of highways network optimization

    Science.gov (United States)

    Sakhapov, R. L.; Nikolaeva, R. V.; Gatiyatullin, M. H.; Makhmutov, M. M.

    2017-12-01

    The article deals with the issue of highways network design. Studies show that the main requirement from road transport for the road network is to ensure the realization of all the transport links served by it, with the least possible cost. The goal of optimizing the network of highways is to increase the efficiency of transport. It is necessary to take into account a large number of factors that make it difficult to quantify and qualify their impact on the road network. In this paper, we propose building an optimal variant for locating the road network on the basis of a mathematical model. The article defines the criteria for optimality and objective functions that reflect the requirements for the road network. The most fully satisfying condition for optimality is the minimization of road and transport costs. We adopted this indicator as a criterion of optimality in the economic-mathematical model of a network of highways. Studies have shown that each offset point in the optimal binding road network is associated with all other corresponding points in the directions providing the least financial costs necessary to move passengers and cargo from this point to the other corresponding points. The article presents general principles for constructing an optimal network of roads.

  4. Research Applications for Teaching (RAFT) Project. Final Report.

    Science.gov (United States)

    Thomson, James R., Jr.; Handley, Herbert M.

    A report is given of the development and progress of the Research Applications for Teaching (RAFT) project, developed at Mississippi State University. Based upon research findings relative to effective teaching and effective schooling, five curriculum modules were prepared and implemented in instruction. In the second year of the project the…

  5. Plant pollution from lead produced by automobile exhaust system near certain highways of Iran

    International Nuclear Information System (INIS)

    Rahmani, H.R.; Kalbasi, M.; Hajrasuliha, Sh.

    2001-01-01

    Plants polluted with Pb produced by automobiles along the roads and highways have extensively been reported all over the world. It is the most important source of pollution in the environment. This research was carried out to determine the polluting degree of plants along the highways such as: Rasht-Anzaly, Kelachay-Ramsar, Tehran-Karaj, and Isfahan-Tehran. At each arbitrary point, a transect 100 meters long perpendicular to the highway was selected for sampling. Along each transect, plants were sampled at 15 cm above the ground, in different distances from the highway. Samples were transported to the laboratory and analyzed by a standard method. The average concentration of total Pb determined in Anzali, Ramsar, Karaj and Delijan (east and west of the road) areas respectively were 114.5, 58.3, 260.2, 75.1 and microgram per gram dry plant weight. Total Pb content in plants along the roads were high and exponentially decreasing with distance from the roadside. Pb concentration in plants were higher than threshold of Standard, so the risk of entrain g of this poisonous element in nutrition system along the roads is very considerable. The plants were polluted from medium degree up to a very high degree. The rate of pollution in plant samples is very high in Karaj area, high in Anzali area, and medium in Ramsar and Delijan areas. Plant pollution was directly related to the traffic volume in road

  6. Defining and implementing a model for pharmacy resident research projects

    Directory of Open Access Journals (Sweden)

    Dick TB

    2015-09-01

    Full Text Available Objective: To describe a standard approach to provide a support structure for pharmacy resident research that emphasizes self-identification of a residency research project. Methods: A subcommittee of the residency advisory committee was formed at our institution. The committee was initially comprised of 2 clinical pharmacy specialists, 1 drug information pharmacist, and 2 pharmacy administrators. The committee developed research guidelines that are distributed to residents prior to the residency start that detail the research process, important deadlines, and available resources. Instructions for institutional review board (IRB training and deadlines for various assignments and presentations throughout the residency year are clearly defined. Residents conceive their own research project and emphasis is placed on completing assignments early in the residency year. Results: In the 4 years this research process has been in place, 15 of 16 (94% residents successfully identified their own research question. All 15 residents submitted a complete research protocol to the IRB by the August deadline. Four residents have presented the results of their research at multi-disciplinary national professional meetings and 1 has published a manuscript. Feedback from outgoing residents has been positive overall and their perceptions of their research projects and the process are positive. Conclusion: Pharmacy residents selecting their own research projects for their residency year is a feasible alternative to assigning or providing lists of research projects from which to select a project.

  7. Advanced Energy Projects: FY 1993, Research summaries

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    AEP has been supporting research on novel materials for energy technology, renewable and biodegradable materials, new uses for scientific discoveries, alternate pathways to energy efficiency, alternative energy sources, innovative approaches to waste treatment and reduction, etc. The summaries are grouped according to projects active in FY 1993, Phase I SBIR projects, and Phase II SBIR projects. Investigator and institutional indexes are included.

  8. Advanced Energy Projects: FY 1993, Research summaries

    International Nuclear Information System (INIS)

    1993-09-01

    AEP has been supporting research on novel materials for energy technology, renewable and biodegradable materials, new uses for scientific discoveries, alternate pathways to energy efficiency, alternative energy sources, innovative approaches to waste treatment and reduction, etc. The summaries are grouped according to projects active in FY 1993, Phase I SBIR projects, and Phase II SBIR projects. Investigator and institutional indexes are included

  9. Research from Afar: Considerations for Conducting an Off-Site Research Project.

    Science.gov (United States)

    Williams, Reg Arthur; Hagerty, Bonnie M.; Hoyle, Kenneth; Yousha, Steven M.; Abdoo, Yvonne; Andersen, Curt; Engler, Dorothy

    1999-01-01

    Critical elements in the success of off-site research projects include the following: negotiation, attention to personnel issues, communication, participation of research subjects, data management, and concern for privacy issues. (SK)

  10. Advanced energy projects: FY 1987 research summaries

    International Nuclear Information System (INIS)

    1987-09-01

    This report contains brief summaries of all projects active in the Division of Advanced Energy Projects during Fiscal Year 1987 (October 1, 1986-September 30, 1987). The intent of this compilation is to provide a convenient means for quickly acquainting an interested reader with the program in Advanced Energy Projects. More detailed information on research activities in a particular project may be obtained by contacting directly the principal investigator. Some projects will have reached the end of their contract periods by the time this book appears, and will, therefore, no longer be active. Those cases in which work was completed in FY '87 are indicated by the footnote: Project completed. The annual funding level of each project is shown

  11. Outflow of traffic from the national capital Kuala Lumpur to the north, south and east coast highways using flow, speed and density relationships

    Institute of Scientific and Technical Information of China (English)

    Nik Hashim Nik Mustapha; Nik Nur Wahidah Nik Hashim

    2016-01-01

    The functional relationships between flow (veh/km), density (veh/h) and speed (km/h) in traffic congestion have a long history of research. However, their findings and techniques persist to be relevant to this day. The analysis is pertinent, particularly in finding the best fit for the three major highways in Malaysia, namely the KL-Karak Highway, KL-Seremban Highway and KL-Ipoh Highway. The trans-logarithm function of density—speed model was compared to the classical models of Greenshields, Greenberg, Underwood and Drake et al. using data provided by the Transport Statistics Malaysia 2014. The results of regression analysis revealed that the Greenshields and Greenberg models were statistically signifi-cant. The trans-logarithm function was also tested and the results were nonetheless without exception. Its usefulness in addition to statistical significance related to the derived economic concepts of maximum speed and the related number of vehicles, flow and density and the limits of free speed were relevant in comparing the individual levels of traffic congestion between highways. For instance, KL-Karak Highway was least congested compared to KL-Seremban Highway and KL-Ipoh Highway. Their maximum speeds, based on three lanes carriage capacity of one direction, were 33.4 km/h for KL-Karak, 15.9 km/h for KL-Seremban, and 21.1 km/h for KL-Ipoh. Their corresponding flows were approxi-mated at 1080.9 veh/h, 1555.4 veh/h, and 1436.6 veh/h.

  12. Cultural differences in Research project management

    Science.gov (United States)

    Barbier, Michele

    2016-04-01

    Scientific Projects today have increased in complexity, requiring multidisciplinarity, and requiring a mix of diverse individuals from different countries who must be integrated into an effective project. Effective team building is one of the prime responsibilities of the project manager. When the project is supported by a funding, the integration and the implication of the different partners are quite easy. Particularly when partners are developing high-performing teams. However, management of research project requires further skills when the budget is not very high and/or when partners are from non-European countries and are not using the same vocabulary. The various cultures, values, beliefs and social usages, particularly with Mediterranean countries cause a special style of communication for an individual or group of individuals. This communication style participates in the success of the project and encompasses a lot of diplomatic skills which will be highlighted.

  13. Cross-disciplinary, authentic student research projects

    NARCIS (Netherlands)

    Heck, A.; Uylings, P.; Kędzierska, E.; Ellermeijer, T.

    2010-01-01

    In the Dutch secondary education system, students must carry out at the end of their school career a rather large research or design project to demonstrate their ability to apply acquired knowledge and skills while pursuing a research question or design goal in some depth. They are encouraged to

  14. Research projects in family medicine funded by the European Union.

    Science.gov (United States)

    Pavličević, Ivančica; Barać, Lana

    2014-01-01

    This study aimed at synthesizing funding opportunities in the field of family medicine by determining the number of family medicine projects, as well as number of project leaderships and/ or participations by each country. This was done in order to encourage inclusion of physicians in countries with underdeveloped research networks in successful research networks or to encourage them to form new ones. We searched the Community Research and Development Information Service project database in February 2013. Study covered the period from years 1992 - 2012, selecting the projects within the field of general/family medicine. The search was conducted in February 2013. First search conducted in the CORDIS database came up with a total of 466 projects. After excluding 241 projects with insufficient data, we analysed 225 remaining projects; out of those, 22 (9.8%) were in the field of family medicine and 203 (90.2%) were from other fields of medicine. Sorted by the number of projects per country, Dutch institutions had the highest involvement in family medicine projects and were partners or coordinators in 18 out of 22 selected projects (81.8%), followed by British institutions with 15 (68.8%), and Spanish with 10 projects (45.5%). Croatia was a partner in a single FP7 Health project. Research projects in family medicine funded by the European Union show significant differences between countries. Constant and high-quality international cooperation in family medicine is the prerequisite for improvement and development of scientific research and the profession. Copyright © 2014 by Academy of Sciences and Arts of Bosnia and Herzegovina.

  15. Sustainable Development Factors in Pavement Life-Cycle: Highway/Airport Review

    Directory of Open Access Journals (Sweden)

    Peyman Babashamsi

    2016-03-01

    Full Text Available Sustainability has gained as much importance as management in business. Sustainable pavement development as a business practice should involve making evaluations according to the triple bottom line in the pavement life-cycle. Despite the current approaches to evaluating the social as well as economic and environmental feasibility of pavement projects (involving highway and airport infrastructure, there has recently been a lack of consensus on a methodology to guarantee sustainability upon assessment and analysis during the pavement life-cycle. As sustainability is a complex issue, this study intends to further explore sustainability and elaborate on its meaning. The second step involves a general depiction of the major sustainability appraisal tools, namely cost-benefit analysis, life-cycle cost analysis, life-cycle assessment, multi-criteria decision-making, environmental impact assessment and social life-cycle assessment, and an explanation of their cons and pros. Subsequently, the article addresses the application of an organized methodology to highlight the main factors or concepts that should be applied in sustainable pavement development and, more specifically, in sustainable pavement management. In the final step, research recommendations toward sustainability are given. This study is aimed to assist decision-makers in pavement management to plan sustainability frameworks in accordance with probable boundaries and restrictions.

  16. Laboratory technology research: Abstracts of FY 1998 projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-11-01

    The Laboratory Technology Research (LTR) program supports high-risk, multidisciplinary research partnerships to investigate challenging scientific problems whose solutions have promising commercial potential. These partnerships capitalize on two great strengths of the country: the world-class basic research capability of the DOE Office of Science (SC) national laboratories and the unparalleled entrepreneurial spirit of American industry. Projects supported by the LTR program in FY 1998 explore the applications of basic research advances relevant to DOE`s mission over a full range of scientific disciplines. The program presently emphasizes three critical areas of mission-related research: advanced materials, intelligent processing and manufacturing research, and environmental and biomedical research. Abstracts for 85 projects are contained in this report.

  17. Fiscal years 2007 and 2008 : representative examples of completed RD&T projects and activities

    Science.gov (United States)

    2009-06-01

    The tables in this document correspond to major offices and initiatives at the Federal Highway Administration's Office of Research, Development, and Technology (RD&T), located at the Turner-Fairbank Highway Research Center. The tables provide represe...

  18. Synthesized research report in the second mid-term research phase. Mizunami Underground Research Laboratory project, Horonobe Underground Research Laboratory project and geo-stability project

    International Nuclear Information System (INIS)

    Hama, Katsuhiro; Sasao, Eiji; Iwatsuki, Teruki; Saegusa, Hiromitsu; Sato, Toshinori; Umeda, Koji; Yasue, Kenichi; Asamori, Koichi; Osawa, Hideaki; Koide, Kaoru; Nagae, Isako; Natsuyama, Ryoko; Mizuno, Takashi; Fujita, Tomoo; Sasamoto, Hiroshi; Matsuoka, Toshiyuki; Yokota, Hideharu; Ishii, Eiichi; Aoyagi, Kazuhei; Nakayama, Masashi; Ito, Hiroaki; Tsusaka, Kimikazu; Ohyama, Takuya; Senba, Takeshi; Amano, Kenji

    2015-08-01

    We have synthesised the research results from Mizunami/Horonobe URLs and geo-stability projects in the second mid-term research phase. It could be used as technical bases for NUMO/Regulator in each decision point from siting to beginning of disposal (Principal Investigation to Detailed Investigation Phase). High quality construction techniques and field investigation methods have been developed and implemented and these will be directly applicable to the National Disposal Program (along with general assessments of hazardous natural events and processes). It will be crucial to acquire technical knowledge on decisions of partial backfilling and final closure by actual field experiments in Mizunami/Horonobe URLs as main themes for the next phases. (author)

  19. Highways of Knowledge

    DEFF Research Database (Denmark)

    Cappelen, Katja Strøm; Højmark, Jeppe; Nielsen, Christian

    The objective of this paper is to discuss mechanisms, enablers and barriers for knowledge transfer in university - industry collaboration projects. The underlying question is how to acquire the right kind of knowledge to stay innovative and competitive in today’s fast changing society. The study......, such as student-industry cooperation or collaboration projects between researchers and businesses. This research shows that to secure real value adding through knowledge transfer in university - in-dustry collaboration projects, it is important that the involved parties view each other as equal part......-ners. Allowing for curiosity, mutual sharing and experimentation might lead to unforeseeable, valu-able knowledge creation in contrast to secrecy and holding back information. Another key finding in this paper is that the level of reciprocal knowledge transfer is perceived as lower in student - business...

  20. Dollars for lives: the effect of highway capital investments on traffic fatalities.

    Science.gov (United States)

    Nguyen-Hoang, Phuong; Yeung, Ryan

    2014-12-01

    This study examines the effect of highway capital investments on highway fatalities. We used state-level data from the 48 contiguous states in the United States from 1968 through 2010 to estimate the effects on highway fatalities of capital expenditures and highway capital stock. We estimated these effects by controlling for a set of control variables together with state and year dummy variables and state-specific linear time trends. We found that capital expenditures and capital stock had significant and negative effects on highway fatalities. States faced with declines in gas tax revenues have already cut back drastically on spending on roads including on maintenance and capital outlay. If this trend continues, it may undermine traffic safety. While states and local governments are currently fiscally strained, it is important for them to continue investments in roadways to enhance traffic safety and, more significantly, to save lives. Copyright © 2014 National Safety Council and Elsevier Ltd. All rights reserved.

  1. Highway and interline transportation routing models

    International Nuclear Information System (INIS)

    Joy, D.S.; Johnson, P.E.

    1994-01-01

    The potential impacts associated with the transportation of hazardous materials are important issues to shippers, carriers, and the general public. Since transportation routes are a central characteristic in most of these issues, the prediction of likely routes is the first step toward the resolution of these issues. In addition, US Department of Transportation requirements (HM-164) mandate specific routes for shipments of highway controlled quantities of radioactive materials. In response to these needs, two routing models have been developed at Oak Ridge National Laboratory under the sponsorship of the U.S. Department of Energy (DOE). These models have been designated by DOE's Office of Environmental Restoration and Waste Management, Transportation Management Division (DOE/EM) as the official DOE routing models. Both models, HIGHWAY and INTERLINE, are described

  2. SAGE as a Source for Undergraduate Research Projects

    Science.gov (United States)

    Hutz, Benjamin

    2017-01-01

    This article examines the use of the computer algebra system SAGE for undergraduate student research projects. After reading this article, the reader should understand the benefits of using SAGE as a source of research projects and how to commence working with SAGE. The author proposes a tiered working group model to allow maximum benefit to the…

  3. Outline of criticality safety research project

    International Nuclear Information System (INIS)

    Kobayashi, Iwao; Tachimori, Shoichi; Suzaki, Takenori; Takeshita, Isao; Miyoshi, Yoshinori; Nakajima, Ken; Sakurai, Satoshi; Yanagisawa, Hiroshi

    1987-01-01

    As the power generation capacity of LWRs in Japan increased, the establishment and development of nuclear fuel cycle have become the important subject. Conforming to the safety research project of the nation, the Japan Atomic Energy Research Institute has advanced the project of constructing a new research facility, that is, Nuclear Fuel Cycle Engineering Research Facility (NUCEF). In this facility, it is planned to carry out the research on criticality safety, upgraded reprocessing techniques, and the treatment and disposal of transuranium element wastes. In this paper, the subjects of criticality safety research and the research carried out with a criticality safety experiment facility which is expected to be installed in the NUCEF are briefly reported. The experimental data obtained from the criticality safety handbooks and published literatures in foreign countries are short of the data on the mixture of low enriched uranium and plutonium which is treated in the reprocessing of spent fuel from LWRs. The acquisition of the criticality data for various forms of fuel, the elucidation of the scenario of criticality accidents, and the soundness of the confinement system for gaseous fission products and plutonium are the main subjects. The Static Criticality Safety Facility, Transient Criticality Safety Facility and pulse column system are the main facilities. (Kako, I.)

  4. Research and investigation on medical usage of cyclotrons as a special research project

    International Nuclear Information System (INIS)

    1980-01-01

    In the National Institute of Radiological Sciences, the special research project ''Research and investigation on the medical usage of cyclotrons'' had been carried out in the three years program from fiscal 1976 to 1978. Its purpose was to establish the methods of therapy using particle beam such as fast neutrons and the methods of diagnosis using short-lived radioisotopes and positron-emitting radioisotopes. The works were conducted comprehensively in cooperation of the personnel both in and outside the NIRS. Consequently, the purpose was able to be fulfilled satisfactorily. Following on this project, a new special research project ''Research and investigation on the medical usage of particle accelerators'' was started in fiscal 1979. These results are described on the effects of the therapy, diagnostic utilizations, and the medical usage of heavy ion accelerators. (J.P.N.)

  5. US heat pump research and development projects, 1976-1986

    Energy Technology Data Exchange (ETDEWEB)

    Zimmerman, K.H.

    1987-04-01

    This document, which is an updated version of US Heat Pump Research and Development Projects, published in August 1982 by the US Department of Energy, is a compilation of one-page summaries and publication and patent information for 233 individual research and development projects on heat pumps covering the years 1976 through 1986. The majority of the projects refer to heat pumps in space-conditioning applications. The document is intended to include information on all projects in the United States for which results are publicly available. Ten different indexes are included to aid the reader in locating specific projects.

  6. Countermeasures that work : a highway safety countermeasure guide for state highway safety offices : eighth edition : 2015

    Science.gov (United States)

    2015-11-01

    The guide is a basic reference to assist State Highway Safety Offices in selecting effective, evidence- based : countermeasures for traffic safety problem areas. These areas include: : - Alcohol-and Drug-Impaired Driving; : - Seat Belts and Child Res...

  7. Towards efficient use of research resources: a nationwide database of ongoing primary care research projects in the Netherlands.

    Science.gov (United States)

    Kortekaas, Marlous F; van de Pol, Alma C; van der Horst, Henriëtte E; Burgers, Jako S; Slort, Willemjan; de Wit, Niek J

    2014-04-01

    PURPOSE. Although in the last decades primary care research has evolved with great success, there is a growing need to prioritize the topics given the limited resources available. Therefore, we constructed a nationwide database of ongoing primary care research projects in the Netherlands, and we assessed if the distribution of research topics matched with primary care practice. We conducted a survey among the main primary care research centres in the Netherlands and gathered details of all ongoing primary care research projects. We classified the projects according to research topic, relation to professional guidelines and knowledge deficits, collaborative partners and funding source. Subsequently, we compared the frequency distribution of clinical topics of research projects to the prevalence of problems in primary care practice. We identified 296 ongoing primary care research projects from 11 research centres. Most projects were designed as randomized controlled trial (35%) or observational cohort (34%), and government funded mostly (60%). Thematically, most research projects addressed chronic diseases, mainly cardiovascular risk management (8%), depressive disorders (8%) and diabetes mellitus (7%). One-fifth of the projects was related to defined knowledge deficits in primary care guidelines. From a clinical primary care perspective, research projects on dermatological problems were significantly underrepresented (P = 0.01). This survey of ongoing projects demonstrates that primary care research has a firm basis in the Netherlands, with a strong focus on chronic disease. The fit with primary care practice can improve, and future research should address knowledge deficits in professional guidelines more.

  8. NASA's Morphing Project Research Summaries in Fiscal Year 2002

    Science.gov (United States)

    McGowan, Anna-Maria R.; Waszak, Martin R.

    2005-01-01

    The Morphing Project at the National Aeronautics and Space Agency s (NASA) Langley Research Center (LaRC) is part of the Breakthrough Vehicle Technologies Project, Vehicle Systems Program that conducts fundamental research on advanced technologies for future flight vehicles. The objectives of the Morphing Project are to develop and assess the advanced technologies and integrated component concepts to enable efficient, multi-point adaptability of flight vehicles; primarily through the application of adaptive structures and adaptive flow control to substantially alter vehicle performance characteristics. This document is a compilation of research summaries and other information on the project for fiscal year 2002. The focus is to provide a brief overview of the project content, technical results and lessons learned. At the time of publication, the Vehicle Systems Program (which includes the Morphing Project) is undergoing a program re-planning and reorganization. Accordingly, the programmatic descriptions of this document pertain only to the program as of fiscal year 2002.

  9. Synthesized research report in the second mid-term research phase. Mizunami Underground Research Laboratory project, Horonobe Underground Research Laboratory project and geo-stability project (Translated document)

    International Nuclear Information System (INIS)

    Hama, Katsuhiro; Sasao, Eiji; Iwatsuki, Teruki; Onoe, Hironori; Sato, Toshinori; Yasue, Kenichi; Asamori, Koichi; Niwa, Masakazu; Osawa, Hideaki; Nagae, Isako; Natsuyama, Ryoko; Fujita, Tomoo; Sasamoto, Hiroshi; Matsuoka, Toshiyuki; Takeda, Masaki; Aoyagi, Kazuhei; Nakayama, Masashi; Miyakawa, Kazuya; Ito, Hiroaki; Ohyama, Takuya; Senba, Takeshi; Amano, Kenji

    2016-08-01

    We have synthesized the research results from the Mizunami/Horonobe Underground Research Laboratories (URLs) and geo-stability projects in the second mid-term research phase. This report can be used as a technical basis for the Nuclear Waste Management Organization of Japan/Regulator at each decision point from siting to beginning of disposal (Principal Investigation to Detailed Investigation Phase). High-quality construction techniques and field investigation methods have been developed and implemented, which will be directly applicable to the National Disposal Program (together with general assessments of hazardous natural events and processes). Acquisition of technical knowledge on decisions of partial backfilling and final closure from actual field experiments in the Mizunami/Horonobe URLs will be crucial as the main theme for the next phases. (author)

  10. Evaluation of bridge decks using non-destructive evaluation (NDE) at near highway speeds for effective asset management - pilot project.

    Science.gov (United States)

    2016-09-29

    This project piloted the findings from an initial research and development project pertaining to the detection, : quantification, and visualization of bridge deck distresses through the use of remote sensing techniques, specifically : combining optic...

  11. Laboratory Technology Research: Abstracts of FY 1996 projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    The Laboratory Technology Research (LTR) program supports high-risk, multidisciplinary research partnerships to investigate challenging scientific problems whose solutions have promising commercial potential. These partnerships capitalize on two great strengths of this country: the world-class basic research capability of the DOE Energy Research (ER) multi-program national laboratories and the unparalleled entrepreneurial spirit of American industry. Projects supported by the LTR program are conducted by the five ER multi-program laboratories: Argonne, Brookhaven, Lawrence Berkeley, Oak Ridge, and Pacific Northwest National Laboratories. These projects explore the applications of basic research advances relevant to Department of Energy`s (DOE) mission over a full range of scientific disciplines. The program presently emphasizes three critical areas of mission-related research: advanced materials, intelligent processing/manufacturing research, and sustainable environments.

  12. Evaluation of a radar-based proximity warning system for off-highway dump trucks.

    Science.gov (United States)

    Ruff, Todd

    2006-01-01

    A radar-based proximity warning system was evaluated by researchers at the Spokane Research Laboratory of the National Institute for Occupational Safety and Health to determine if the system would be effective in detecting objects in the blind spots of an off-highway dump truck. An average of five fatalities occur each year in surface mines as a result of an equipment operator not being aware of a smaller vehicle, person or change in terrain near the equipment. Sensor technology that can detect such obstacles and that also is designed for surface mining applications is rare. Researchers worked closely with the radar system manufacturer to test and modify the system on large, off-highway dump trucks at a surface mine over a period of 2 years. The final system was thoroughly evaluated by recording video images from a camera on the rear of the truck and by recording all alarms from the rear-mounted radar. Data show that the system reliably detected small vehicles, berms, people and other equipment. However, alarms from objects that posed no immediate danger were common, supporting the assertion that sensor-based systems for proximity warning should be used in combination with other devices, such as cameras, that would allow the operator to check the source of any alarm.

  13. Landslides along Highways: GIS-based Inventory and Planning Issues

    Science.gov (United States)

    Jaeger, Ann-Kathrin; Klose, Martin; Damm, Bodo

    2015-04-01

    assess landslide impacts and the effectiveness of measures for their mitigation. The landslide inventory is part of an ongoing study concerned with the problems of damage financing at low-volume roads in mountain areas with shrinking populations and fiscal deficits. Using the example of the Harz Mountains, a key research question refers to a comparison of the costs necessary to spend for safe road operations with the benefits from providing traffic connections to landslide-prone rural communities. This study combines the damage and loss data stored in the inventory with different data sets on traffic density, local population, and road financing. The research results contribute to the development of planning strategies for cost-efficient maintenance of highway infrastructures exposed to landslide hazards. References Bhandary, N.P., Yatabe, R., Dahal, R.K., Hasegawa, S., Inagaki, H., 2013. Areal distribution of large-scale landslides along highway corridors in central Nepal. Georisk 7, 1-20. Hungr, O., Evans, S.G., Hazzard, J., 1999. Magnitude and frequency of rock falls and rockslides along the main transportation corridors of southwestern British Columbia. Canadian Geotechnical Journal 36, 224-238 Klose, M., Damm, B., Terhorst, B., 2014b. Landslide cost modeling for transportation infrastructures: a methodological approach. Landslides, DOI 10.1007/s10346-014-0481-1. Saha, A.K., Arora, M.K., Gupta, R.P., Virdi, M.L., Csaplovics, E., 2005. GIS-based route planning in landslide-prone areas. International Journal of Geographical Information Science 19, 1149-1175.

  14. Distributed Research Project Scheduling Based on Multi-Agent Methods

    Directory of Open Access Journals (Sweden)

    Constanta Nicoleta Bodea

    2011-01-01

    Full Text Available Different project planning and scheduling approaches have been developed. The Operational Research (OR provides two major planning techniques: CPM (Critical Path Method and PERT (Program Evaluation and Review Technique. Due to projects complexity and difficulty to use classical methods, new approaches were developed. Artificial Intelligence (AI initially promoted the automatic planner concept, but model-based planning and scheduling methods emerged later on. The paper adresses the project scheduling optimization problem, when projects are seen as Complex Adaptive Systems (CAS. Taken into consideration two different approaches for project scheduling optimization: TCPSP (Time- Constrained Project Scheduling and RCPSP (Resource-Constrained Project Scheduling, the paper focuses on a multiagent implementation in MATLAB for TCSP. Using the research project as a case study, the paper includes a comparison between two multi-agent methods: Genetic Algorithm (GA and Ant Colony Algorithm (ACO.

  15. Research oriented projects on design themese

    DEFF Research Database (Denmark)

    Tollestrup, Christian; Eriksen, Kaare; Ovesen, Nis

    2011-01-01

    How can design students do research-oriented projects about design themes? At the 3rd semester at the Industrial Design Master Program at Aalborg University this is done by taking research oriented learning objectives on design theories and methods and combining them with experimental case studie...... and professional self-reflection amongst students are improved....

  16. Outflow of traffic from the national capital Kuala Lumpur to the north, south and east coast highways using flow, speed and density relationships

    Directory of Open Access Journals (Sweden)

    Nik Hashim Nik Mustapha

    2016-12-01

    Full Text Available The functional relationships between flow (veh/km, density (veh/h and speed (km/h in traffic congestion have a long history of research. However, their findings and techniques persist to be relevant to this day. The analysis is pertinent, particularly in finding the best fit for the three major highways in Malaysia, namely the KL-Karak Highway, KL-Seremban Highway and KL-Ipoh Highway. The trans-logarithm function of density–speed model was compared to the classical models of Greenshields, Greenberg, Underwood and Drake et al. using data provided by the Transport Statistics Malaysia 2014. The results of regression analysis revealed that the Greenshields and Greenberg models were statistically significant. The trans-logarithm function was also tested and the results were nonetheless without exception. Its usefulness in addition to statistical significance related to the derived economic concepts of maximum speed and the related number of vehicles, flow and density and the limits of free speed were relevant in comparing the individual levels of traffic congestion between highways. For instance, KL-Karak Highway was least congested compared to KL-Seremban Highway and KL-Ipoh Highway. Their maximum speeds, based on three lanes carriage capacity of one direction, were 33.4 km/h for KL-Karak, 15.9 km/h for KL-Seremban, and 21.1 km/h for KL-Ipoh. Their corresponding flows were approximated at 1080.9 veh/h, 1555.4 veh/h, and 1436.6 veh/h.

  17. Catalogue of research projects

    International Nuclear Information System (INIS)

    Skarp, K.

    1993-01-01

    The Centre for Materials Science serves as an umbrella for organizations involved in materials research at the two Universities and at certain branch institutes in the Gothenburg region. The general goal of the Centre is to promote materials research among the member organizations and to provide a link to industry and to the society at large. Members of the Centre work on most aspects of modern materials research, ranging from single-atom manipulation and theoretical simulations to biomaterials and production engineering. In order to give a presentation of the members and their research, the Centre produces an inventory of materials research projects approximately every four years. The 1993 issue is somewhat more extensive than previous editions, detailing e.g. also scientific equipment and listing work published during the past four years. The register covers the following main headings: General materials and surface science; Materials chemistry; Polymers and fibres; Biomaterials; Clusters and fine particles; Electronic and opto-electronic materials; Superconductors and nanometer structures; Ceramics; Metals; Building materials; Production and materials processing

  18. Monitoring bridge scour using fiber optic sensors : research project capsule.

    Science.gov (United States)

    2009-03-01

    The interstate highway network is an : important national asset. Bridges : constituting critical nodes within : transportation networks are the : backbone of the transportation : infrastructure. It is well known that : scour is one of the major cours...

  19. Alternative method of highway traffic safety analysis for developing countries using delphi technique and Bayesian network.

    Science.gov (United States)

    Mbakwe, Anthony C; Saka, Anthony A; Choi, Keechoo; Lee, Young-Jae

    2016-08-01

    Highway traffic accidents all over the world result in more than 1.3 million fatalities annually. An alarming number of these fatalities occurs in developing countries. There are many risk factors that are associated with frequent accidents, heavy loss of lives, and property damage in developing countries. Unfortunately, poor record keeping practices are very difficult obstacle to overcome in striving to obtain a near accurate casualty and safety data. In light of the fact that there are numerous accident causes, any attempts to curb the escalating death and injury rates in developing countries must include the identification of the primary accident causes. This paper, therefore, seeks to show that the Delphi Technique is a suitable alternative method that can be exploited in generating highway traffic accident data through which the major accident causes can be identified. In order to authenticate the technique used, Korea, a country that underwent similar problems when it was in its early stages of development in addition to the availability of excellent highway safety records in its database, is chosen and utilized for this purpose. Validation of the methodology confirms the technique is suitable for application in developing countries. Furthermore, the Delphi Technique, in combination with the Bayesian Network Model, is utilized in modeling highway traffic accidents and forecasting accident rates in the countries of research. Copyright © 2016 Elsevier Ltd. All rights reserved.

  20. Highway renewable energy : photovoltaic noise barriers

    Science.gov (United States)

    2017-07-01

    Highway photovoltaic noise barriers (PVNBs) represent the combination of noise barrier systems and photovoltaic systems in order to mitigate traffic noise while simultaneously producing renewable energy. First deployed in Switzerland in 1989, PVNBs a...

  1. Transition curves for highway geometric design

    CERN Document Server

    Kobryń, Andrzej

    2017-01-01

    This book provides concise descriptions of the various solutions of transition curves, which can be used in geometric design of roads and highways. It presents mathematical methods and curvature functions for defining transition curves. .

  2. Increasing seat belt use through state-level demonstration projects : a compendium of initial findings

    Science.gov (United States)

    2008-08-01

    This report summarizes the efforts and results from four of six State-level demonstration projects supported with cooperative agreements from the National Highway Traffic Safety Administration. The projects were intended to increase seat belt use sta...

  3. Light water reactor safety research project

    International Nuclear Information System (INIS)

    Markoczy, G.; Aksan, S.N.; Behringer, K.; Prodan, M.; Stierli, F.; Ullrich, G.

    1980-07-01

    The research and development activities for the safety of Light Water Power Reactors carried out 1979 at the Swiss Federal Institute for Reactor Research are described. Considerations concerning the necessity, objectives and size of the Safety Research Project are presented, followed by a detailed discussion of the activities in the five tasks of the program, covering fracture mechanics and nondestructive testing, thermal-hydraulics, reactor noise analysis and pressure vessel steel surveillance. (Auth.)

  4. Annual review of research projects 1984

    International Nuclear Information System (INIS)

    Keam, D.W.

    1986-02-01

    This progress report provides a brief outline of current laboratory research and development projects and their present status. Research fields covered are: uranium, radon and its daughters, radiation effects in solids and gases, x-rays and clinical dosimetry, measurement standards in radiation dosimetry, radiopharmaceuticals and nuclear medicine, non-ionizing electromagnetic radiations, environmental radiochemistry and radiation monitoring

  5. Annual review of research projects 1983

    International Nuclear Information System (INIS)

    1985-08-01

    This progress report provides a brief outline of current laboratory research and development projects and their present status. Research fields covered are: uranium, radon and its daughters, radiation effects in solids and gases, thermoluminescence, x-rays and clinical dosimetry, measurement standards in radiation dosimetry, radiopharmaceuticals and nuclear medicine, radionuclide metrology, non-ionizing electromagnetic radiations, environmental radiochemistry and radiation monitoring

  6. Methodology for evaluation of railroad technology research projects

    Science.gov (United States)

    1981-04-01

    This Project memorandum presents a methodology for evaluating railroad research projects. The methodology includes consideration of industry and societal benefits, with special attention given to technical risks, implementation considerations, and po...

  7. 23 CFR 636.119 - How does this part apply to a project developed under a public-private partnership?

    Science.gov (United States)

    2010-04-01

    ... public-private partnership? 636.119 Section 636.119 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT... does this part apply to a project developed under a public-private partnership? (a) In order for a... Federal-aid procurement procedures will depend on the nature of the public-private agreement. (1) If the...

  8. Kentucky's highway incident management strategic plan.

    Science.gov (United States)

    2005-06-01

    Kentucky s Highway Incident Management Strategic Plan consists of a mission statement, 4 goals, 16 objectives, and 49 action strategies. The action strategies are arranged by priority and recommended time frame for implementation. When implemented...

  9. The M77 Highway: saving lives and money.

    Science.gov (United States)

    Crane, Evan O T; Augustine, Angelica; Tait, Gavin R

    2008-09-01

    Upgrading of a stretch of the A77, a major road in South West Scotland to Highway status has resulted in a significant reduction in the incidence of serious and fatal road traffic accidents on a major international route. Notwithstanding the pain and suffering prevented, the annual economic savings amount to over pound 6.1 Million ($12.14 M/euro 7.96 M) The Highway, with an effective central reservation barrier, will pay for itself in 17 years and will continue to prevent serious injury and save lives.

  10. Experimental plasma research project summaries

    International Nuclear Information System (INIS)

    1992-06-01

    This is the latest in a series of Project Summary books going back to 1976 and is the first after a hiatus of several years. They are published to provide a short description of each project supported by the Experimental Plasma Research Branch of the Division of Applied Plasma Physics in the Office of Fusion Energy. The Experimental Plasma Research Branch seeks to provide a broad range of experimental data, physics understanding, and new experimental techniques that contribute to operation, interpretation, and improvement of high temperature plasma as a source of fusion energy. In pursuit of these objectives, the branch supports research at universities, DOE laboratories, other federal laboratories and industry. About 70 percent of the funds expended are spent at universities and a significant function of this program is the training of students in fusion physics. The branch supports small- and medium-scale experimental studies directly related to specific critical plasma issues of the magnetic fusion program. Plasma physics experiments are conducted on transport of particles and energy within plasma and innovative approaches for operating, controlling, and heating plasma are evaluated for application to the larger confinement devices of the magnetic fusion program. New diagnostic approaches to measuring the properties of high temperature plasmas are developed to the point where they can be applied with confidence on the large-scale confinement experiments. Atomic data necessary for impurity control, interpretation of diagnostic data, development of heating devices, and analysis of cooling by impurity ion radiation are obtained. The project summaries are grouped into these three categories of plasma physics, diagnostic development and atomic physics

  11. Artificial potential functions for highway driving with collision avoidance

    OpenAIRE

    Wolf , Michael T.; Burdick, Joel W.

    2008-01-01

    We present a set of potential function components to assist an automated or semi-automated vehicle in navigating a multi-lane, populated highway. The resulting potential field is constructed as a superposition of disparate functions for lane- keeping, road-staying, speed preference, and vehicle avoidance and passing. The construction of the vehicle avoidance potential is of primary importance, incorporating the structure and protocol of laned highway driving. Particularly, the shape and dimen...

  12. A Generalized Mathematical Model for the Fracture Problem of the Suspended Highway

    Directory of Open Access Journals (Sweden)

    Zhao Ying

    2017-01-01

    Full Text Available In order to answer dangling fracture problems of highway, the suspended pavement equivalent for non - suspended pavement, through the special boundary conditions has been suspended highway stress field of expression, in accordance with the 3D fracture model of crack formation, and establish a vacant, a general mathematics model for fracture problems of highway and analysis in highway suspended segment weight and vehicle load limit of highway capacity of Pu For overturning road inPu is less than the force of carrying more than compared to the work and fruit Bridge Hydropower Station Road engineering examples to verify suspended highway should force field expressions for the correctness and applicability. The results show that: when the hanging ratio R 0. 243177 limits of Pu design axle load 100kN. When the vertical crack in the vacant in the direction of length greater than 0. 1, the ultimate bearing capacity is less than the design axle load 100kN; when the hanging ratio R is less than 0. 5, the road to local fracture, the ultimate bearing capacity of suspended stress field expressions in solution; when the hanging ratio is greater than or equal to 0. 5, the road does not reach the limit bearing capacity of the whole body; torque shear surface of the effect is far less than the bending moments on shear planes.

  13. A Novel Beamforming Technique for Highways Coverage Using High-Altitude Platforms

    Directory of Open Access Journals (Sweden)

    Yasser Albagory

    2007-01-01

    Full Text Available This paper proposes a novel beamforming technique to form an arbitrary-shaped cell for the high-altitude platforms (HAPs mobile communications. The new technique is based on pattern summation of individual low-sidelobe, narrow beams which constitute the desired cell pattern weighted by an amplitude correcting function. The new cell pattern can be adapted to cover the main highways forming worm-shaped cells which may cover the highway for long distances up to 100 km and it will have an important role in reducing frequent handoffs and signaling traffic of location updating from moving users over the long highways.

  14. Transportation Infrastructure: Progress on and Challenges to Central Artery/Tunnel Project's Cost and Financing

    Science.gov (United States)

    1997-07-01

    The Central Artery/Tunnel project in Boston, Massachusetts--one of the largest, most complex, and most expensive highway construction projects ever undertaken--is well under way, with contracts worth nearly $8 billion either completed or awarded. Con...

  15. Abstract and research accomplishments of University Coal Research Projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    The Principal Investigators of the grants supported by the University Coal Research Program were requested to submit abstracts and highlight accomplishments of their respective projects in time for distribution at a conference on June 13--14, 1995 at Tennessee State University in Nashville, Tennessee. This book is a compilation of the material received in response to that request. For convenience, the 70 grants reported in this book are stored into eight technical areas, Coal Science, Coal Surface Science, Reaction Chemistry, Advanced Process Concepts, Engineering Fundamentals and Thermodynamics, Environmental Science, high Temperature Phenomena, and Special topics. Indexes are provided for locating projects by subject, principal investigators, and contracting organizations. Each extended abstract describes project objectives, work accomplished, significance to the Fossil Energy Program, and plans for the next year.

  16. Spatial Econometric Research on the Relationship between Highway Construction and Regional Economic Growth in China: Evidence from the Nationwide Panel Data

    Science.gov (United States)

    Ye, N. J.; Li, W. J.; Li, Y.; Bai, Y. F.

    2017-12-01

    Based on spatial panel data from 2010 to 2016 in China, this paper makes an empirical analysis on the relationship between highway construction and regional economic growth by means of spatial econometric model. The results show that there is positive spatial correlation on regional economic growth in China, and strong spatial dependences between some provinces and cities appear, specifically, Hebei, Beijing, Tianjin, Shanghai, Zhejiang and other eastern coastal areas show high-high agglomeration trend, the Pearl River Delta region presents high-low agglomeration trend; In terms of nationwide provinces and municipalities, a province’s highway construction investment for their own province and the neighboring provinces has pulling effect on economic growth to a certain extent, and the direct effect is more obvious.

  17. The Universities and JAERI joint research project. The achievements and prospects

    International Nuclear Information System (INIS)

    Ohashi, Hiroshi; Nakamura, Takashi; Yamaguchi, Sadaei

    1999-01-01

    The universities and JAERI joint research project has been carried out since 13 years ago on an equivalent basis with the universities and JAERI and co-ownership of the results. This paper consists of the history and results of research project and evaluation. The significance, characteristics, themes and problems of the project are arranged. The main results and the future of the project are explained. Two large projects such as the backend chemical project and the high-degree application of radiation project have been studied. The backend chemical project consisted of four themes; the nuclear chemical researches for TRU recycle, the solid chemical research of nuclear fuel and waste, new separation method for reprocessing and waste disposal and the fundamental chemical researches for disposal waste. The high-degree application of radiation project have eight themes; effects of ion beam on organism, slow positron generation and its application to materials, ion irradiation effects on polymer materials, nuclear spectroscopy and nuclear physics of isotope using online isotope separator, shield and behavior of accelerator radiation, materials analysis by ion beam, effects of nuclear transformation product by nuclear fusion reactor radiation damage and biofunction analysis of plant using positron release nuclide. (S.Y.)

  18. History of Road Design Standards in LADOTD : Research Project Capsule

    Science.gov (United States)

    2012-10-01

    According to the Louisiana Statewide Transportation Plan, Louisianas highway : network is comprised of over 60,000 miles, of which over 16,000 miles are : maintained by the state. The roadways were designed and constructed : according to the desig...

  19. Evaluation of using crushed brick as coarse aggregate in concrete layer within rigid highway pavement

    Directory of Open Access Journals (Sweden)

    Alwash Ali

    2018-01-01

    Full Text Available Most of the present studies related to the field of highway pavement construction technique tend to make use of the local available materials as substitutes for the imported and necessary materials for some of the practical application. For this reason this research aims at looking for the prospect of used locally available aggregate such as crushed clay bricks for the aim of producing proper concrete with suitable thermal and mechanical properties. Experimental investigations have been carried out to asses the effect of partial replacement of coarse aggregate by free manually crushed Brick with percentages (10, 20, 30 and 40% of virgin coarse aggregate in concrete mix for highway rigid pavement. While the percentage (0% replacement represent reference mix. Mix proportion based on the target of compressive strength for all replacement percentage of (33 MPa at (28 days to achieve AASHTO requirement for highway concrete rigid pavement .The results of flexural strength, modulus of elasticity, density and thermal conductivity refers to better performance (less thickness of concrete layer with large spacing between contraction or expansion joints and less stresses due to warping induced concrete layer for concrete mix with 20% crushed brick as replacement of coarse aggregate.

  20. Ground-Penetrating-Radar Profiles of Interior Alaska Highways: Interpretation of Stratified Fill, Frost Depths, Water Table, and Thaw Settlement over Ice-Rich Permafrost

    Science.gov (United States)

    2016-08-01

    along either massive ice surfaces or within sections of segregated ice. The uninsulated ice surface at Tok in Figure 17B is irregular. All of the...ER D C/ CR RE L TR -1 6- 14 ERDC’s Center-Directed Research Program Ground -Penetrating-Radar Profiles of Interior Alaska Highways...August 2016 Ground -Penetrating-Radar Profiles of Interior Alaska Highways Interpretation of Stratified Fill, Frost Depths, Water Table, and Thaw

  1. Structural requirements of research tissue banks derived from standardized project surveillance.

    Science.gov (United States)

    Herpel, E; Koleganova, N; Schreiber, B; Walter, B; Kalle, C V; Schirmacher, P

    2012-07-01

    Tissue banks constitute decisive and rate-limiting resource and technology platforms for basic and translational biomedical research, notably in the area of cancer. Thus, it is essential to plan and structure tissue banking and allocate resources according to research needs, but essential requirements are still incompletely defined. The tissue bank of the National Center of Tumor Diseases Heidelberg (NCT) was founded with the intention to provide tissues of optimal quality and to prioritize the realization of research projects. We analysed its structure and prospective project management registration as well as tracking records for all projects of the NCT tissue bank as of its start in 2005 in order to obtain information that may be relevant for tissue bank planning. All project proposals submitted to the NCT tissue bank (n = 681) were included in the study. For a detailed evaluation of provided services, only projects that were completed until July 2011 (n = 605) were analysed. For these 605 projects, NCT tissue bank provided 769 specific services. In all projects/services, we recorded project leader, type and amount of material provided, type of research (basic/translational), work load of project and project completion. Furthermore, all completed projects were tracked after 90 days according to a standard protocol to determine principal investigators' (PI) satisfaction and quality of the provided material. Until July 2011, 605 projects had been successfully completed as documented by material transfer agreement. Of the projects, 72.7 % addressed basic research, 22.3 % were translational research projects and 3 % concerned epidemiological research; 91 % (n = 546) concerned a single PI and the NTC tissue bank. For these projects, 769 specific services were provided. Of these services, 288 concerned providing formalin-fixed and paraffin-embedded (FFPE) tissue (extracts, full size sections), 126 providing fresh frozen materials (including fresh frozen

  2. The CARE project (Coordinated Accelerator Research in Europe)

    International Nuclear Information System (INIS)

    Napoly, Olivier

    2006-01-01

    CARE, an ambitious and coordinated project of accelerator research and developments oriented towards High Energy Physics projects, has been launched in January 2004 by the main European laboratories and the European Commission with the 6th Framework Programme. This project aims at improving existing infrastructures dedicated to future projects such as linear colliders, upgrades of hadron colliders and high intensity proton drivers An important part of this programme is devoted to advancing the performance of the superconducting technology, both in the fields of RF cavities for electron and proton acceleration and of high field magnets, as well as to developing high intensity electron and proton injectors. We describe the plans of the four main Joint Research Activities and report on the results and progress obtained so far. The CARE project also includes three adjacent Networking Activities whose main goal is to organize a forum of discussions and to provide the strategic plans in the fields of the Linear Collider, intense Neutrino Beams, and future Hadron Colliders

  3. Superhydrophobic engineered cementitious composites for highway bridge applications : technology transfer and implementation.

    Science.gov (United States)

    2013-09-01

    The strength and durability of highway bridges are two of the key components in maintaining a : high level of freight transportation capacity on the nations highways. Superhydrophobic : engineered cementitious composite (SECC) is a new advanced con...

  4. GPR used in combination with other NDT methods for assessing pavements in PPP projects

    Science.gov (United States)

    Loizos, Andreas; Plati, Christina

    2014-05-01

    In the recent decades, Public-Private Partnerships (PPP) has been adopted for highway infrastructure procurement in many countries. PPP projects typically take the form of a section of highway and connecting roadways which are to be construction and managed for a given concession period. Over the course of the highway concession period, the private agency takes over the pavement maintenance and rehabilitation duties. On this purpose, it is critical to find the most cost effective way to maintain the infrastructure in compliance with the agreed upon performance measures and a Pavement Management Systems (PMS) is critical to the success of this process. For the prosperous operation of a PMS it is necessary to have appropriate procedures for pavement monitoring and evaluation, which is important in many areas of pavement engineering. Non Destructive Testing (NDT) has played a major role in pavement condition monitoring, assessments and evaluation accomplishing continuous and quick collection of pavement data. The analysis of this data can lead to indicators related to trigger values (criteria) that define the pavement condition based on which the pavement "health" is perceived helping decide whether there is the need or not to intervene in the pavement. The accomplished perception appoints required management activities for preserving pavements in favor not only of the involved highway/road agencies but also of users' service. Amongst NDT methods Ground Penetrating Radar (GPR) seems to be a very powerful toll, as it provides a range of condition and construction pavement information. It can support effectively the implementation of PMS activities in the framework of pavement monitoring and evaluation. Given that, the present work aims to the development and adaptation of a protocol for the use of GPR in combination with other NDT methods, such as Falling Weight Deflectometer (FWD), for assessing pavements in PPP projects. It is based on the experience of Laboratory of

  5. Research on bidding quotation game of international project

    Science.gov (United States)

    Lin, Tao; Xu, Xin

    2017-04-01

    Bidding competition of international projects is more and more fierce currently. However, China started late relatively in the field, it is still lack of experience in the aspect of participation in bidding of international projects, and more effective bidding quotation system is not formed till present. Therefore, China can not win through systemic bidding quotation methods compared with many powerful bidding enterprises in the international field. Research on the field is also focused by many aspects as a result. It is urgent to solve related problems. Game theory is combined for analyzing the effectiveness and operability of bidding quotation models mainly based on current situation of bidding market in China international projects during research process in the paper. The research starts with the perspective of bidders for analyzing their game with tenderers and other bidders. The results have operational value aiming at bidders.

  6. 23 CFR Appendix C to Subpart A of... - Federal-Aid Highway Contractors Annual EEO Report (Form PR-1391)

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Federal-Aid Highway Contractors Annual EEO Report (Form PR-1391) C Appendix C to Subpart A of Part 230 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF... Part 230—Federal-Aid Highway Contractors Annual EEO Report (Form PR-1391) EC14OC91.000 ...

  7. Experiences with project-oriented research in graduate engineering education

    International Nuclear Information System (INIS)

    Miley, G.H.

    1976-01-01

    Two examples of project-oriented research that involve the conceptual design of fusion systems are described. One of these projects involved close collaboration with workers in a national laboratory while the second was formally organized as a cooperative effort with two other laboratories. An important educational aspect of such research is that the students are involved in a design team composed of both students and professionals facing a realistic problem. In retrospect, it appears that both students and faculty profited from the experience. Several students have taken jobs in related areas, and additional research has resulted at the University from new insight gained during the projects

  8. United States Crystalline Repository Project - key research areas

    International Nuclear Information System (INIS)

    Patera, E.S.

    1986-01-01

    The Crystalline Repository Project is responsible for siting the second high-level nuclear waste repository in crystalline rock for the US Department of Energy. A methodology is being developed to define data and information needs and a way to evaluate that information. The areas of research the Crystalline Repository Project is involved in include fluid flow in a fractured network, coupled thermal, chemical and flow processes and cooperation in other nations and OECD research programs

  9. The analysis of a condition of an accident rate on highways of Tajikistan

    International Nuclear Information System (INIS)

    Davlatshoev, R.A.; Tursunov, A.A.

    2005-01-01

    In this clause the results of the analysis of an accident rate on highways of Tajikistan, according to the official information State Automobile Inspection the Ministry of Internal affairs of Republic of Tajikistan, and research of safe movement of automobiles in mountain conditions are given. On the basis of the qualitative and quantitative analysis, the ways of safe movement on roads of Republic of Tajikistan are determined

  10. Preliminary Study on Management of Agricultural Scientific Research Projects in the New Situation

    Institute of Scientific and Technical Information of China (English)

    Haiyan LUO; Qingqun YAO; Lizhen CHEN; Yu ZHENG

    2015-01-01

    Project management of agricultural scientific research institutions is an important section of agricultural scientific research plan management. It is of great significance for sustainable development of scientific research work of scientific research institutions. According to a series of opinions and notices about scientific and technological system reform issued by the state,and combining current situations of management of scientific research projects in scientific research institutions,this paper made a preliminary study on management of agricultural scientific research projects in the new trend. Finally,on the basis of the current situations of management of agricultural scientific research projects,it came up with pertinent recommendations,including strengthening communication and cooperation and actively declaring projects,strengthening preliminary planning of projects and establishing project information database,reinforcing project process management,ensuring on-time and high quality completion of projects,and strengthening learning and improving quality of management personnel.

  11. POLYCYCLIC AROMATIC HYDROCARBON CONTAMINATION LEVELS IN COLLECTED SAMPLES FROM VICINITY OF A HIGHWAY

    Directory of Open Access Journals (Sweden)

    S. V. Samimi ، R. Akbari Rad ، F. Ghanizadeh

    2009-01-01

    Full Text Available Tehran as the biggest city of Iran with a population of more than 10 millions has potentially high pollutant exposures of gas oil and gasoline combustion from vehicles that are commuting in the highways every day. The vehicle exhausts contain polycyclic aromatic hydrocarbons, which are produced by incomplete combustion and can be directly deposited in the environment. In the present study, the presence of polycyclic aromatic hydrocarbons contamination in the collected samples of a western highway in Tehran was investigated. The studied location was a busy highway in Tehran. High performance liquid chromatography equipped with florescence detector was used for determination of polycyclic aromatic hydrocarbons concentrations in the studied samples. Total concentration of the ten studied polycyclic aromatic hydrocarbons compounds ranged from 11107 to 24342 ng/g dry weight in the dust samples and increased from 164 to 2886 ng/g dry weight in the soil samples taken from 300 m and middle of the highway, respectively. Also the average of Σ PAHs was 1759 ng/L in the water samples of pools in parks near the highway. The obtained results indicated that polycyclic aromatic hydrocarbons contamination levels were very high in the vicinity of the highway.

  12. Effect of chronic nonmalignant pain on highway driving performance.

    Science.gov (United States)

    Veldhuijzen, D S; van Wijck, A J M; Wille, F; Verster, J C; Kenemans, J L; Kalkman, C J; Olivier, B; Volkerts, E R

    2006-05-01

    Most pain patients are treated in an outpatient setting and are engaged in daily activities including driving. Since several studies showed that cognitive functioning may be impaired in chronic nonmalignant pain, the question arises whether or not chronic nonmalignant pain affects driving performance. Therefore, the objective of the present study was to determine the effects of chronic nonmalignant pain on actual highway driving performance during normal traffic. Fourteen patients with chronic nonmalignant pain and 14 healthy controls, matched on age, educational level, and driving experience, participated in the study. Participants performed a standardized on-the-road driving test during normal traffic, on a primary highway. The primary parameter of the driving test is the Standard Deviation of Lateral Position (SDLP). In addition, driving-related skills (tracking, divided attention, and memory) were examined in the laboratory. Subjective assessments, such as pain intensity, and subjective driving quality, were rated on visual analogue scales. The results demonstrated that a subset of chronic nonmalignant pain patients had SDLPs that were higher than the matched healthy controls, indicating worse highway driving performance. Overall, there was a statistically significant difference in highway driving performance between the groups. Further, chronic nonmalignant pain patients rated their subjective driving quality to be normal, although their ratings were significantly lower than those of the healthy controls. No significant effects were found on the laboratory tests.

  13. 高速公路BOT项目特许权期决策研究%Decision-Making on the Concession Term for Highway BOT Project

    Institute of Scientific and Technical Information of China (English)

    刘广平; 赵文忠; 陈立文

    2015-01-01

    How to scientifically determine the concession period is one of the focus problems for the project companies and government departments. In this paper,taking into account the average annual minimum expected return of the project company and the retained earning of the government department,compares two variables of the concession term(Tc)and the time point of traffic saturation(Tb),constructs the decision-making models of concession term for highway BOT project in two conditions of Tc≥Tb and Tc

  14. Least-Present-Value-of-Revenue Auctions and Highway Franchising

    OpenAIRE

    Eduardo M.R.A. Engel; Ronald D. Fischer; Alexander Galetovic

    1998-01-01

    In recent years several countries have started massive highway franchising programs auctioned to private firms. In these auctions, the regulator typically sets the franchise term and firms bid on tolls, or, alternatively, the regulator sets tolls and the winner is the firm that asks for the shortest franchise term. In this paper we argue that many of the problems that highway franchises have encountered are due to the fact that the franchise term cannot adjust to demand realizations. We propo...

  15. Dearfield Dream Project: Developing an Interdisciplinary Historical/Cultural Research Network

    Directory of Open Access Journals (Sweden)

    Robert Brunswig

    2013-08-01

    Full Text Available The Dearfield Dream Project is a collaborative research initiative to conduct historical, cultural, archaeological, and environmental studies on the early 20th Century African-American colony site of Dearfield, Colorado, USA. Because the breadth and significance of the Dearfield Project requires an interdisciplinary research team, a network of research collaborators has been assembled. This research network seeks to discover, preserve, and disseminate knowledge of the site and its surrounding farmsteads’ economic, social, political, and environmental history for better understanding and interpretation of its contributions to Colorado and U.S. history. Herein, we detail progress that has been made on this important historical/cultural research project. Further, we outline the future of the Dearfield research network along with our current and anticipated subjects of inquiry.

  16. 26 CFR 41.4482(a)-1 - Definition of highway motor vehicle.

    Science.gov (United States)

    2010-04-01

    ... of its own motor, whether such motor is powered by gasoline, diesel fuel, special motor fuels... 26 Internal Revenue 16 2010-04-01 2010-04-01 true Definition of highway motor vehicle. 41.4482(a... (CONTINUED) MISCELLANEOUS EXCISE TAXES EXCISE TAX ON USE OF CERTAIN HIGHWAY MOTOR VEHICLES Tax on Use of...

  17. Study of Collaborative Management for Transportation Construction Project Based on BIM Technology

    Science.gov (United States)

    Jianhua, Liu; Genchuan, Luo; Daiquan, Liu; Wenlei, Li; Bowen, Feng

    2018-03-01

    Abstract. Building Information Modeling(BIM) is a building modeling technology based on the relevant information data of the construction project. It is an advanced technology and management concept, which is widely used in the whole life cycle process of planning, design, construction and operation. Based on BIM technology, transportation construction project collaborative management can have better communication through authenticity simulation and architectural visualization and can obtain the basic and real-time information such as project schedule, engineering quality, cost and environmental impact etc. The main services of highway construction management are integrated on the unified BIM platform for collaborative management to realize information intercommunication and exchange, to change the isolated situation of information in the past, and improve the level of information management. The final BIM model is integrated not only for the information management of project and the integration of preliminary documents and design drawings, but also for the automatic generation of completion data and final accounts, which covers the whole life cycle of traffic construction projects and lays a good foundation for smart highway construction.

  18. Interdisciplinary physics research in the Japanese Hadron Project

    International Nuclear Information System (INIS)

    Yamazaki, Toshimitsu.

    1990-09-01

    The Japanese Hadron Project (JHP) is a large future plan of interdisciplinary and international scope, aimed at basic physics research by creating and using various secondary unstable particle beams such as mesons, muons, neutrons and accelerated exotic nuclei. It comprises a high-intensity proton linac of 1 GeV, a compressor/stretcher ring and an ISOL/accelerator to deliver beams to MESON, NEUTRON and EXOTIC NUCLEI arena's. In addition, as the present ongoing project, we are pushing KAON arena based on the KEK 12 GeV proton synchrotron. The present paper describes the scientific motivation and technological bases for this future project as well as the presently going pre-JHP research activities. (author)

  19. Lead concentrations and reproduction in highway-nesting barn swallows

    Science.gov (United States)

    Grue, C.E.; O'Shea, T.J.; Hoffman, D.J.

    1984-01-01

    Swallows (Hirundo rustica) collected within the right-of-way of a major Maryland highway were greater than those found in Barn Swallows nesting within a rural area. Lead concentrations in the feathers of adults from the highway colony were also greater than Lead concentrations in the carcasses and stomach contents of adult and nestling Barn those of rural adults, but concentrations in the feathers of nestlings from the two locations were similar. Activity of u-aminolevulinic acid dehydratase in red blood cells was lower in highway-nesting adults and their young than in their rural counterparts, although hemoglobin concentrations and hematocrits did not differ. The number of eggs, nestlings, and body weights of the latter at 16-18 days of age were similar in the two colonies, as were body weights of adults from the two areas. These results suggest that contamination of roadside habitats by lead from automotive emissions does not pose a serious hazard to birds that are aerial feeders.

  20. CURRENT STATUS OF RESEARCH PROJECT ACTIVITIES IN MEDICAL UNIVERSITIES IN BULGARIA.

    Directory of Open Access Journals (Sweden)

    Svetoslav Garov

    2013-07-01

    Full Text Available Introduction: In Bulgaria there are five medical universities: in the cities of Sofia, Plovdiv, Varna, Pleven and Stara Zagora. Their main mission is training specialists in the fields of medicine and health care, increasing their qualification by means of postgraduate education and performing research activities. One of medical universities’ top priorities is encouraging research activities mainly aimed at preparation and implementation of research projects. Aim: The purpose of our study is to examine the current status of research project activities in Bulgarian medical universities.Material and methods: In order to define the science competitions related to Bulgarian medical universities we have applied a documentary and sociological approach. Results: Research projects that Bulgarian medical universities can apply for are divided into two groups – national and international. The most significant international projects are European ones since Bulgaria is an EU member state and this allows us to participate in such projects. Conclusion: Universities should strive for establishing even better conditions for encouraging application for research projects aimed at developing competent and experienced staff, even though the majority of them may not obtain approval for financing.The changes in the situation regarding Bulgarian science require the implementation and development of more research staff motivated to improve their knowledge and skills in the relevant dynamically changing competition and project field.

  1. Creative and Arts-Based Research Methods in Academic Research. Lessons from a Participatory Research Project in the Netherlands

    Directory of Open Access Journals (Sweden)

    Gwenda van der Vaart

    2018-05-01

    Full Text Available This article contributes to the discussion on the value of creative and arts-based research methods to researchers interested in community resilience. Based on a participatory research project that used a mix of these methods conducted in a Dutch village, we provide more nuanced, concrete insights into their value. We elaborate on the three project stages: walking interviews, group discussions, and a creative workshop that resulted in an exhibition, and on the challenges encountered during our project. We discuss how each project stage contributed to producing multifaceted knowledge. Researchers can benefit from the discussions about the process and implications of creative and arts-based methods such as ours as, to date, there has been relatively little methodological reflection on these methods. Based on our study, we conclude that despite some challenges, creative and arts-based research methods have much to offer researchers interested in community resilience. We found they can: 1. generate deep insight by going beyond rational-cognitive ways of knowing and providing new ways of understanding people's real lived experiences and views; and 2. offer ways to "give back" and contribute to a community, potentially igniting a spark among community members to engage in further action and contribute to their community's resilience. This aligns with the, currently often articulated, aims of researchers to directly benefit those involved and to share their research findings with a broader non-academic audience.

  2. Dynamic Estimation on Output Elasticity of Highway Capital Stock in China

    Science.gov (United States)

    Li, W. J.; Zuo, Q. L.; Bai, Y. F.

    2017-12-01

    By using the Perpetual Inventory Method to calculate the capital stock of highway in China from 1988 to 2016, the paper builds the State Space Model based on Translog Production Function, according to the Ridge Regression and Kalman Filter Method, the dynamic estimation results of output elasticity are measured continuously and analyzed. The conclusions show that: Firstly, China’s growth speed on highway industry capital stock are divided into three stages which are respectively from 1988 to 2000, from 2001 to 2009 and from 2010 to 2016, during which shows steady growth, between which reflect rapid growth; Secondly, the output elasticity of highway capital stock, being between 0.154 and 0.248, is slightly larger than the output elasticity of human input factor, lower than the output elasticity of the technical level, shows positive effect on transport economy and rises steadily, but the output efficiency is low on the whole; Thirdly, around the year of 2010, the scale pay on highway industry begins to highlight the characteristic of increase.

  3. University-Level Research Projects for High School Students

    Science.gov (United States)

    McConnell, Mark L.

    2000-01-01

    The goal of this project was to provide an opportunity for high school students to participate in university-level research projects. In this case, students from Pinkerton Academy (Derry, New Hampshire) were invited to participate in efforts to catalog data from the COMPTEL experiment on NASA's Compton Gamma-Ray Observatory (CGRO). These activities were part of a senior level honors course at Pinkerton. Although the success of this particular program was rather limited, we feel that the general concept is a sound one. In principle, the concept of partnerships between local schools and university researchers is one that could be especially attractive to soft money researchers. Programs can be carefully designed to benefit both the students and the research program.

  4. Creating public value : Optimizing cooperation Between public and private Partners in infrastructure Projects

    NARCIS (Netherlands)

    Koops, L.S.W.

    2017-01-01

    Infrastructure projects - such as the construction of tunnels and bridges or the (re)construction of roads and highways – are always performed to add quality to society. In The Netherlands, these projects are most often financed by the government, from local to national level, and constructed by

  5. Performance analysis of Brazilian highways under concession through the capacity and level of service

    Energy Technology Data Exchange (ETDEWEB)

    Silveira Santos, T.; Martins Ribeiro, P.C.

    2016-07-01

    This paper proposes the development of a methodology to analyze the performance of highways under concession through the capacity and level of service, with special attention to Brazilian highways. The trajectory of transport infrastructure provision in Brazil and its performance assessment framework are mentioned, as well as an approach of the level of service concept and the Highway Capacity Manual (HCM). An inventory of the highway with the necessary data to the model is proposed. This database should incorporate information from multiple data sources and its use will be important for the processing and compilation of raw data in order to structure a full informational basis. Then, it is developed a method for segmentation of homogeneous road sections, as conceptualized by HCM, and proposed a way of level of service measurement. Finally, there are analysis of the use of HCM in some highways concession programs in Brazil. (Author)

  6. Research capacity building integrated into PHIT projects: leveraging research and research funding to build national capacity.

    Science.gov (United States)

    Hedt-Gauthier, Bethany L; Chilengi, Roma; Jackson, Elizabeth; Michel, Cathy; Napua, Manuel; Odhiambo, Jackline; Bawah, Ayaga

    2017-12-21

    Inadequate research capacity impedes the development of evidence-based health programming in sub-Saharan Africa. However, funding for research capacity building (RCB) is often insufficient and restricted, limiting institutions' ability to address current RCB needs. The Doris Duke Charitable Foundation's African Health Initiative (AHI) funded Population Health Implementation and Training (PHIT) partnership projects in five African countries (Ghana, Mozambique, Rwanda, Tanzania and Zambia) to implement health systems strengthening initiatives inclusive of RCB. Using Cooke's framework for RCB, RCB activity leaders from each country reported on RCB priorities, activities, program metrics, ongoing challenges and solutions. These were synthesized by the authorship team, identifying common challenges and lessons learned. For most countries, each of the RCB domains from Cooke's framework was a high priority. In about half of the countries, domain specific activities happened prior to PHIT. During PHIT, specific RCB activities varied across countries. However, all five countries used AHI funding to improve research administrative support and infrastructure, implement research trainings and support mentorship activities and research dissemination. While outcomes data were not systematically collected, countries reported holding 54 research trainings, forming 56 mentor-mentee relationships, training 201 individuals and awarding 22 PhD and Masters-level scholarships. Over the 5 years, 116 manuscripts were developed. Of the 59 manuscripts published in peer-reviewed journals, 29 had national first authors and 18 had national senior authors. Trainees participated in 99 conferences and projects held 37 forums with policy makers to facilitate research translation into policy. All five PHIT projects strongly reported an increase in RCB activities and commended the Doris Duke Charitable Foundation for prioritizing RCB, funding RCB at adequate levels and time frames and for allowing

  7. Laboratory technology research - abstracts of FY 1997 projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-01

    The Laboratory Technology Research (LTR) program supports high-risk, multidisciplinary research partnerships to investigate challenging scientific problems whose solutions have promising commercial potential. These partnerships capitalize on two great strengths of this country: the world-class basic research capability of the DOE Energy Research (ER) multi-program national laboratories and the unparalleled entrepreneurial spirit of American industry. A distinguishing feature of the ER multi-program national laboratories is their ability to integrate broad areas of science and engineering in support of national research and development goals. The LTR program leverages this strength for the Nation`s benefit by fostering partnerships with US industry. The partners jointly bring technology research to a point where industry or the Department`s technology development programs can pursue final development and commercialization. Projects supported by the LTR program are conducted by the five ER multi-program laboratories. These projects explore the applications of basic research advances relevant to DOE`s mission over a full range of scientific disciplines. The program presently emphasizes three critical areas of mission-related research: advanced materials; intelligent processing/manufacturing research; and sustainable environments.

  8. Checklist for transition to new highway fuel(s).

    Energy Technology Data Exchange (ETDEWEB)

    Risch, C.; Santini, D.J. (Energy Systems)

    2011-12-15

    Transportation is vital to the U.S. economy and society. As such, U.S. Presidents have repeatedly stated that the nation needs to reduce dependence on petroleum, especially for the highway transportation sector. Throughout history, highway transportation fuel transitions have been completed successfully both in United States and abroad. Other attempts have failed, as described in Appendix A: Historical Highway Fuel Transitions. Planning for a transition is critical because the changes can affect our nation's ability to compete in the world market. A transition will take many years to complete. While it is tempting to make quick decisions about the new fuel(s) of choice, it is preferable and necessary to analyze all the pertinent criteria to ensure that correct decisions are made. Doing so will reduce the number of changes in highway fuel(s). Obviously, changes may become necessary because of occurrences such as significant technology breakthroughs or major world events. With any and all of the possible transitions to new fuel(s), the total replacement of gasoline and diesel fuels is not expected. These conventional fuels are envisioned to coexist with the new fuel(s) for decades, while the revised fuel and vehicle infrastructures are implemented. The transition process must analyze the needs of the primary 'players,' which consist of the customers, the government, the fuel industry, and the automotive industry. To maximize the probability of future successes, the prime considerations of these groups must be addressed. Section 2 presents a succinct outline of the Checklist. Section 3 provides a brief discussion about the groupings on the Checklist.

  9. The JAERI and Universities joint project research reports on the 4th joint research project between JAERI and Universities on backend chemistry

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-02-01

    In the Joint Research Project between JAERI and Universities on Backend Chemistry, the 4th-term researches of it were performed on sixteen themes from April of 1999 to March of 2001 under the four categories, i.e. Nuclear-chemistry and physical-chemistry properties of actinides', 'Solid state chemistry and nuclear fuel engineering of actinides', 'Solution chemistry and technologies for separation and analysis of actinides' and Treatment of radioactive waste and environmental chemistry'. The present report compiled the papers contributed to the Joint Research Project. (author)

  10. Harvard Personal Genome Project: lessons from participatory public research

    Science.gov (United States)

    2014-01-01

    Background Since its initiation in 2005, the Harvard Personal Genome Project has enrolled thousands of volunteers interested in publicly sharing their genome, health and trait data. Because these data are highly identifiable, we use an ‘open consent’ framework that purposefully excludes promises about privacy and requires participants to demonstrate comprehension prior to enrollment. Discussion Our model of non-anonymous, public genomes has led us to a highly participatory model of researcher-participant communication and interaction. The participants, who are highly committed volunteers, self-pursue and donate research-relevant datasets, and are actively engaged in conversations with both our staff and other Personal Genome Project participants. We have quantitatively assessed these communications and donations, and report our experiences with returning research-grade whole genome data to participants. We also observe some of the community growth and discussion that has occurred related to our project. Summary We find that public non-anonymous data is valuable and leads to a participatory research model, which we encourage others to consider. The implementation of this model is greatly facilitated by web-based tools and methods and participant education. Project results are long-term proactive participant involvement and the growth of a community that benefits both researchers and participants. PMID:24713084

  11. Harvard Personal Genome Project: lessons from participatory public research.

    Science.gov (United States)

    Ball, Madeleine P; Bobe, Jason R; Chou, Michael F; Clegg, Tom; Estep, Preston W; Lunshof, Jeantine E; Vandewege, Ward; Zaranek, Alexander; Church, George M

    2014-02-28

    Since its initiation in 2005, the Harvard Personal Genome Project has enrolled thousands of volunteers interested in publicly sharing their genome, health and trait data. Because these data are highly identifiable, we use an 'open consent' framework that purposefully excludes promises about privacy and requires participants to demonstrate comprehension prior to enrollment. Our model of non-anonymous, public genomes has led us to a highly participatory model of researcher-participant communication and interaction. The participants, who are highly committed volunteers, self-pursue and donate research-relevant datasets, and are actively engaged in conversations with both our staff and other Personal Genome Project participants. We have quantitatively assessed these communications and donations, and report our experiences with returning research-grade whole genome data to participants. We also observe some of the community growth and discussion that has occurred related to our project. We find that public non-anonymous data is valuable and leads to a participatory research model, which we encourage others to consider. The implementation of this model is greatly facilitated by web-based tools and methods and participant education. Project results are long-term proactive participant involvement and the growth of a community that benefits both researchers and participants.

  12. Most promising research : research peer exchange, August 13-14, 2013.

    Science.gov (United States)

    2013-08-01

    Under 23 United States Code of Federal Regulations 420.209 (a)(7), as a condition for approval of Federal : Highway Administration (FHWA) planning and research funds for research activities, each states : Department of Transportation (DOT) is requ...

  13. Vertebrate road kill survey on a highway in southern Brazil

    Directory of Open Access Journals (Sweden)

    Luiz Liberato Costa Corrêa

    2017-06-01

    Full Text Available Highways are a major factor acting in the decline of several wildlife populations. Impact occurs due to the continuous flow of motor vehicles over tracks and collision with animals using the same area. This study aimed to list road killed wild vertebrates found in highways in the Pampa Biome, state of Rio Grande do Sul, over an entire year. The taxa found (amphibians, reptiles, birds and mammals were identified to species level and their frequency of occurrence was seasonally registered. Along 2,160 km, we found 318 road killed individuals, totaling 65 species. This number represents an average of 0.147 road killed specimens by kilometer (that is, 1 individual each 7 km. Of these, seven species are under threat of extinction in the state of Rio Grande do Sul. We also found a seasonal pattern among road kills, in which the highest number of road killed animals was registered in the summer and spring months. These results contribute to increase knowledge about which species are most impacted by road kill on highways of the Pampa Biome. Such data can be used as an indicator for the implementation of measures by competent bodies to mitigate impacts of highways in the state of Rio Grande do Sul.

  14. Toolbox for Research, or how to facilitate a central data management in small-scale research projects.

    Science.gov (United States)

    Bialke, Martin; Rau, Henriette; Thamm, Oliver C; Schuldt, Ronny; Penndorf, Peter; Blumentritt, Arne; Gött, Robert; Piegsa, Jens; Bahls, Thomas; Hoffmann, Wolfgang

    2018-01-25

    In most research projects budget, staff and IT infrastructures are limiting resources. Especially for small-scale registries and cohort studies professional IT support and commercial electronic data capture systems are too expensive. Consequently, these projects use simple local approaches (e.g. Excel) for data capture instead of a central data management including web-based data capture and proper research databases. This leads to manual processes to merge, analyze and, if possible, pseudonymize research data of different study sites. To support multi-site data capture, storage and analyses in small-scall research projects, corresponding requirements were analyzed within the MOSAIC project. Based on the identified requirements, the Toolbox for Research was developed as a flexible software solution for various research scenarios. Additionally, the Toolbox facilitates data integration of research data as well as metadata by performing necessary procedures automatically. Also, Toolbox modules allow the integration of device data. Moreover, separation of personally identifiable information and medical data by using only pseudonyms for storing medical data ensures the compliance to data protection regulations. This pseudonymized data can then be exported in SPSS format in order to enable scientists to prepare reports and analyses. The Toolbox for Research was successfully piloted in the German Burn Registry in 2016 facilitating the documentation of 4350 burn cases at 54 study sites. The Toolbox for Research can be downloaded free of charge from the project website and automatically installed due to the use of Docker technology.

  15. Spatial, road geometric, and biotic factors associated with Barn Owl mortality along an interstate highway

    Science.gov (United States)

    Arnold, Erin M.; Hanser, Steven E.; Regan, Tempe; Thompson, Jeremy; Lowe, Melinda; Kociolek, Angela; Belthoff, James R.

    2018-01-01

    Highway programs typically focus on reducing vehicle collisions with large mammals because of economic or safety reasons while overlooking the millions of birds that die annually from traffic. We studied wildlife‐vehicle collisions along an interstate highway in southern Idaho, USA, with among the highest reported rates of American Barn Owl Tyto furcata road mortality. Carcass data from systematic and ad hoc surveys conducted in 2004–2006 and 2013–2015 were used to explore the extent to which spatial, road geometric, and biotic factors explained Barn Owl‐vehicle collisions. Barn Owls outnumbered all other identified vertebrate species of roadkill and represented > 25% of individuals and 73.6% of road‐killed birds. At a 1‐km highway segment scale, the number of dead Barn Owls decreased with increasing numbers of human structures, cumulative length of secondary roads near the highway, and width of the highway median. Number of dead Barn Owls increased with higher commercial average annual daily traffic (CAADT), small mammal abundance index, and with grass rather than shrubs in the roadside verge. The small mammal abundance index was also greater in roadsides with grass versus mixed shrubs, suggesting that Barn Owls may be attracted to grassy portions of the highway with more abundant small mammals for hunting prey. When assessed at a 3‐km highway segment scale, the number of dead Barn Owls again increased with higher CAADT as well as with greater numbers of dairy farms. At a 5‐km scale, number of dead Barn Owls increased with greater percentage of cropland near the highway. While human conversion of the environment from natural shrub‐steppe to irrigated agriculture in this region of Idaho has likely enhanced habitat for Barns Owls, it simultaneously has increased risk for owl‐vehicle collisions where an interstate highway traverses the altered landscape. We review some approaches for highway mitigation and suggest that reducing wildlife

  16. Are Project Developers Knights and Researchers Queens?

    DEFF Research Database (Denmark)

    Vinstrup, Anya Bjørn

    2014-01-01

    How do project developers at universities view their customers – the researchers, and how do they see themselves as a profession? Does this view influence their motivation and what challenges does it impose? Taking elements of theory from Public Service Motivation (PSM) and linking it with a small...... empirically based survey among the project developers at a centrally located office at a university in Denmark – these questions are sought to be answered. The focal point being the motivation of the project developer, with special emphasis on their user perception, and the practical implications it has...... for leadership and organisational structures....

  17. Data base on nuclear power plant dose reduction research projects

    Energy Technology Data Exchange (ETDEWEB)

    Khan, T.A.; Dionne, B.J.; Baum, J.W.

    1985-12-01

    This report contains project information on the research and development activities of the nuclear power industry in the area of dose reduction. It is based on a data base of information set up at the ALARA Center of Brookhaven National Laboratory. One purpose of this report is to draw attention to work in progress and to enable researchers and subscribers to obtain further information from the investigators and project managers. Information is provided on 180 projects, divided according to whether they are oriented to Engineering Research or to Health Physics Technology. The report contains indices on main category, project manager, principal investigator, sponsoring organization, contracting organization, and subject. This is an initial report. It is intended that periodic updates be issued whenever sufficient material has been accumulated.

  18. Data base on nuclear power plant dose reduction research projects

    International Nuclear Information System (INIS)

    Khan, T.A.; Dionne, B.J.; Baum, J.W.

    1985-12-01

    This report contains project information on the research and development activities of the nuclear power industry in the area of dose reduction. It is based on a data base of information set up at the ALARA Center of Brookhaven National Laboratory. One purpose of this report is to draw attention to work in progress and to enable researchers and subscribers to obtain further information from the investigators and project managers. Information is provided on 180 projects, divided according to whether they are oriented to Engineering Research or to Health Physics Technology. The report contains indices on main category, project manager, principal investigator, sponsoring organization, contracting organization, and subject. This is an initial report. It is intended that periodic updates be issued whenever sufficient material has been accumulated

  19. Korea-China optical technology research centre project

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Cheol Jung; Lee, J M; Rhee, Y J. and others

    2001-09-01

    The main objectives of this project are to establish the internatinal collaboration basis of optical technolgies between Korean and China through the combination of the Chinese advanced fundamental technologies with the Korea industrialization and commercialization infrastructures, by ways of exchanging scientist and informations, holding joint seminars, cooperative utilization of research resources. On the ground of this establishment, the optical technologies of Korea are supposed to be leveled up to that of the world-most advanced. At the same time, for the improvement of mutual benefit and financial profit of both of the countries, technical support for the investment on the optical industries in the two countries and establishment of foundation for the venture capitals are also the purpose of this project. Because the state-of-the-arts of the Chinese technologies such as aerospace engineering, military defense technology, applications to medical treatments, laser fusion research, and so on, are known to be far above those of Korean and upto one of the most advanced in the world, it is necessary that the acquisition of these technologies, resulting in the enhancement of the levels of domestic technologies in these fields, implementation of joint research projects for technology development as well as the balanced opportunities for commercial product/sales and cooperation should be actively pursued.

  20. Korea-China Optical Technology Research Centre Project

    International Nuclear Information System (INIS)

    Kim, Cheol Jung; Rhee, Y. J.; Jung, D. Y. and others

    2004-06-01

    The main objectives of this project are to establish the international collaboration basis of optical technologies between Korea and China. The combination of the Chinese advanced fundamental technologies with the Korean industrialization and commercialization infrastructures is realized, by ways of exchanging scientists and informations, holding joint seminars, cooperative utilization of research resources. On the ground of this establishment, the optical technologies of Korea are supposed to be leveled up to those of the world-most advanced. At the same time, for the improvement of mutual benefit and financial profit of both countries, providing technical advice and suggestions to the optical industries in the two countries is an another goal of this project. The state-of-the-arts of the Chinese technologies such as aerospace engineering, military defence technology, medical technology, laser fusion research, and so on, are known to be far above those of Korean and up to one of the most advanced in the world. Thus it is thought to be necessary that the acquisition of these technologies, implementation of joint research projects for technology development as well as the balanced opportunities for commercial product/sales and cooperation should be actively pursued in order to enhance the levels of Korean technologies in these fields

  1. Korea-China optical technology research centre project

    International Nuclear Information System (INIS)

    Kim, Cheol Jung; Lee, J. M.; Rhee, Y. J. and others

    2001-09-01

    The main objectives of this project are to establish the internatinal collaboration basis of optical technolgies between Korean and China through the combination of the Chinese advanced fundamental technologies with the Korea industrialization and commercialization infrastructures, by ways of exchanging scientist and informations, holding joint seminars, cooperative utilization of research resources. On the ground of this establishment, the optical technologies of Korea are supposed to be leveled up to that of the world-most advanced. At the same time, for the improvement of mutual benefit and financial profit of both of the countries, technical support for the investment on the optical industries in the two countries and establishment of foundation for the venture capitals are also the purpose of this project. Because the state-of-the-arts of the Chinese technologies such as aerospace engineering, military defense technology, applications to medical treatments, laser fusion research, and so on, are known to be far above those of Korean and upto one of the most advanced in the world, it is necessary that the acquisition of these technologies, resulting in the enhancement of the levels of domestic technologies in these fields, implementation of joint research projects for technology development as well as the balanced opportunities for commercial product/sales and cooperation should be actively pursued

  2. Korea-China Optical Technology Research Centre Project

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Cheol Jung; Rhee, Y. J.; Jung, D. Y. and others

    2004-06-15

    The main objectives of this project are to establish the international collaboration basis of optical technologies between Korea and China. The combination of the Chinese advanced fundamental technologies with the Korean industrialization and commercialization infrastructures is realized, by ways of exchanging scientists and informations, holding joint seminars, cooperative utilization of research resources. On the ground of this establishment, the optical technologies of Korea are supposed to be leveled up to those of the world-most advanced. At the same time, for the improvement of mutual benefit and financial profit of both countries, providing technical advice and suggestions to the optical industries in the two countries is an another goal of this project. The state-of-the-arts of the Chinese technologies such as aerospace engineering, military defence technology, medical technology, laser fusion research, and so on, are known to be far above those of Korean and up to one of the most advanced in the world. Thus it is thought to be necessary that the acquisition of these technologies, implementation of joint research projects for technology development as well as the balanced opportunities for commercial product/sales and cooperation should be actively pursued in order to enhance the levels of Korean technologies in these fields.

  3. 23 CFR 420.121 - What other requirements apply to the administration of FHWA planning and research funds?

    Science.gov (United States)

    2010-04-01

    ... Administration of FHWA Planning and Research Funds § 420.121 What other requirements apply to the administration... 23 Highways 1 2010-04-01 2010-04-01 false What other requirements apply to the administration of FHWA planning and research funds? 420.121 Section 420.121 Highways FEDERAL HIGHWAY ADMINISTRATION...

  4. Improved traffic control measures to prevent incorrect turns at highway-rail grade crossings.

    Science.gov (United States)

    2013-11-01

    A number of injuries and fatal collisions have occurred at certain highway-rail grade crossings that are located immediately adjacent to highway intersections, driveways or interstate ramps. Some guide signage, pavement markings, and other traffic co...

  5. Reading Research Utilization Project: An RIC Project for Teachers and Other Field Personnel.

    Science.gov (United States)

    District of Columbia Public Schools, Washington, DC. Dept. of Research and Evaluation.

    This is the final report of the Reading Research Utilization Project (RUP) which was funded by the U.S. Office of Education from July, 1971 to June, 1973. The purpose of the RUP was to encourage the translation of research, particularly reading research, into practice in 16 target elementary schools in Washington, D.C. RUP was a school information…

  6. Research projects and capacity building | Breen | Water SA

    African Journals Online (AJOL)

    ... by capacity building in the context of research projects. Based on this interpretation, reasonable and unreasonable expectations with respect to the extent to which capacity building can be achieved within a given project duration are discussed. A model is suggested, which would improve understanding and delivery and ...

  7. Alaska Highway bibliography, 3rd edition

    DEFF Research Database (Denmark)

    Prange, Laurie

    Since the early 20th century various schemes were considered for the construction of roads, trails or railways 71 to link the Yukon, northern British Columbia and Alaska to the “outside.” These schemes were motivated by economic interests, including mining, lumber and tourism concerns. During...... the 1920s and 1930s a small but vocal group of “builders” began to campaign for a highway, either a coastal or inland route, to improve the northwest’s economic base. With the impending threat of war in the late 1930s, there was an increasing awareness by the American and Canadian governments...... increasing military needs. The unexpected bombing of Pearl Harbour in December 1941 stimulated interest in the construction of the Alaska Highway by the American government. The U.S. Army Corps of Engineers selected a route based on the location of the NWSR airfields and the military needs for an alternative...

  8. Crowd-sourced Archaeological Research: The MicroPasts Project

    Directory of Open Access Journals (Sweden)

    Chiara Bonacchi

    2014-10-01

    Full Text Available This paper offers a brief introduction to MicroPasts, a web-enabled crowd-sourcing and crowd-funding project whose overall goal is to promote the collection and use of high quality research data via institutional and community collaborations, both on- and off-line. In addition to introducing this initiative, the discussion below is a reflection of its lead author’s core contribution to the project and will dwell in more detail on one particular aspect of MicroPasts: its relevance to research and practice in public archaeology, cultural policy and heritage studies.

  9. On-going research projects at Ankara Nuclear research center in agriculture and animal science

    International Nuclear Information System (INIS)

    Tukenmez, I.

    2004-01-01

    Full text:The research and development activities of Ankara Nuclear Research Center in Agriculture and Animal Science(ANRCAA) are concentrated on the contribution of atomic energy to peace by the use of nuclear and related techniques in food, agriculture and animal science. Nuclear techniques are used in the above fields in two ways: in vitro or in vivo radio tracing the substances and processes of biological importance, and irradiation of biological materials for preservation and quality modification. Research projects are carried out by interdisciplinary studies with well equipped laboratories at the Center. The projects in progress conducted by the Center comprises nuclear-aided researches in soil fertility, plant nutrition, plant protection, improvement of field crops, improvement of horticultural plants and forest trees by mutation breeding, in vitro culture technique with mutagen treatments, use of phosphogypsum in soil amelioration, sterilization of medical supplies, wastewater treatment, animal nutrition, animal health and productivity and accreditation. The on-going projects with the above subjects will be summarized for possible collaborations

  10. On-going research projects at Ankara Nuclear Research Center in Agriculture and Animal Science

    International Nuclear Information System (INIS)

    Tukenmez, I.

    2004-01-01

    Full text: The research and development activities of Ankara Nuclear Research Center in Agriculture and Animal Science(ANRCAA) are concentrated on the contribution of atomic energy to peace by the use of nuclear and related techniques in food, agriculture and animal science. Nuclear techniques are used in the above fields in two ways: in vitro or in vivo radio tracing the substances and processes of biological importance, and irradiation of biological materials for preservation and quality modification. Research projects are carried out by interdisciplinary studies with well equipped laboratories at the Center. The projects in progress conducted by the Center comprises nuclear-aided researches in soil fertility, plant nutrition, plant protection, improvement of field crops, improvement of horticultural plants and forest trees by mutation breeding, in vitro culture technique with mutagen treatments, use of phosphogypsum in soil amelioration, sterilization of medical supplies, wastewater treatment, animal nutrition, animal health and productivity and accreditation. The on-going projects with the above subjects will be summarized for possible collaborations

  11. Illinois highway materials sustainability efforts of 2015.

    Science.gov (United States)

    2016-08-01

    This report provides a summary of the sustainability efforts of the Illinois Department of Transportation (IDOT) in recycling : reclaimed materials in highway construction during calendar year 2015. This report meets the requirements of Illinois Publ...

  12. Highway runoff in areas of karst topography.

    Science.gov (United States)

    2004-01-01

    Karst terrain is characterized by sinkholes, depressions, caves, and underground drainage, generally underlain by soluble rocks such as limestone and dolomite. Because natural filtration through soil is limited in karst areas, pollutants in highway s...

  13. Illinois highway materials sustainability efforts of 2014.

    Science.gov (United States)

    2015-08-01

    This report presents the 2014 sustainability efforts of the Illinois Department of Transportation (IDOT) in : recycling reclaimed materials in highway construction. This report meets the requirements of Illinois : Public Act 097-0314 by documenting I...

  14. Illinois highway materials sustainability efforts of 2016.

    Science.gov (United States)

    2017-07-04

    This report provides a summary of the sustainability efforts of the Illinois Department of Transportation (IDOT) in recycling : reclaimed materials in highway construction during calendar year 2016. This report meets the requirements of Illinois Publ...

  15. CARONTE project: Creating an Agenda for Research on Transportation Security

    Energy Technology Data Exchange (ETDEWEB)

    Leon Bello, J.; Gonzalez Viosca, E.

    2016-07-01

    Europe’s prosperity relies on effective transport systems. Any attacks and disturbances to land freight and passenger transport would have significant impact on economic growth, territorial cohesion, social development and the environment. Unfortunately, there are weaknesses in the land transport security.The objective of CARONTE project is define a future research agenda for security in land transport that focuses on core gaps caused by emerging risks while avoiding any doubling-up of research elsewhere. Its research agenda will cover all threats, including cyber-crime, and security aspects across all modes of land transportation. At the same time, it will respect the fundamental human rights and privacy of European citizens. The step-by-step method of CARONTE’s consortium has analyzed the state of the art and emerging risks; has identified gaps, analyses and assessments of potential solutions; and has produced an overall research agenda for the future. CARONTE’s results will answer the following questions among others: Which existing research projects merit a follow up and extension? Where are the combinations or synergy effects to be attended? Which themes and topics should be elaborated in new research projects? Who should be involved and integrated in future research projects (stakeholders, authorities, etc.)? The CARONTE consortium includes universities and research institutes, companies, and end-users providing with experience in research and consultancy in transportation, logistics, infrastructure management, security and communications. ITENE - Instituto Tecnológico del Embalaje, Transporte y Logística-has been one of the Project partners among a total of 11 members from eight different countries in the European Union which have also been supported via a High Level Advisory Board. (Author)

  16. Water Resources Research Grant Program project descriptions, fiscal year 1987

    Science.gov (United States)

    ,

    1987-01-01

    This report contains information on the 34 new projects funded by the United States Geological Survey 's Water Resources Research Grant Program in fiscal year 1987 and on 3 projects completed during the year. For the new projects, the report gives the grant number, project title, performing organization, principal investigator(s), and a project description that includes: (1) identification of water related problems and problem-solution approach (2) contribution to problem solution, (3) objectives, and (4) approach. The 34 projects include 12 in the area of groundwater quality problems, 12 in the science and technology of water quality management, 1 in climate variability and the hydrologic cycle, 4 in institutional change in water resources management, and 5 in surface water management. For the three completed projects, the report furnishes the grant number; project title; performing organization; principal investor(s); starting data; data of receipt of final report; and an abstract of the final report. Each project description provides the information needed to obtain a copy of the final report. The report contains tables showing: (1) proposals received according to area of research interest, (2) grant awards and funding according to area of research interest, (3) proposals received according to type of submitting organization, and (4) awards and funding according to type of organization. (Author 's abstract)

  17. European research project 'Metrology for radioactive waste management'

    International Nuclear Information System (INIS)

    Suran, J.

    2014-01-01

    The three-year European research project M etrology for Radioactive Waste Management' was launched in October 2011 under the EMRP (European Metrology Research Programme). It involves 13 European national metrology institutes and a total budget exceeds four million Euros. The project is coordinated by the Czech Metrology Institute and is divided into five working groups. This poster presents impact, excellence, relevance to EMPR objectives, and implementation and management of this project.(author)

  18. Lessons learned from setting up the NOWESP research data base: Experiences in an interdisciplinary research project

    Science.gov (United States)

    Radach, Günther; Gekeler, Jens

    1996-09-01

    Research carried out within the framework of the MAST project NOWESP (North-West European Shelf Programme) was based on a multi-parameter data set of existing marine data, relevant for estimating trends, variability and fluxes on the Northwest European Shelf. The data sets were provided by the partners of the project. Additional data sets were obtained from several other institutions. During the project, the data were organized in the NOWESP Research Data Base (NRDB), for which a special data base scheme was defined that was capable of storing different types of marine data. Data products, like time series and interpolated fields, were provided to the partners for analysis (Radach et al. [1997]). After three years of project time, the feasibility of such an approach is discussed. Ways of optimizing data access and evaluation are proposed. A project-oriented Research Data Base is a useful tool because of its flexibility and proximity to the research being carried out. However, several requirements must be met to derive optimum benefits from this type of service unit. Since this task usually is carried out by a limited number of staff, an early start of project data management is recommended. To enable future projects to succeed in an analogous compilation of relevant data for their use, as performed in NOWESP, the task of organizing the data sets for any short-term project should be shared between a research data base group and a national or international data centre whose experience and software could be used. It must be ensured that only quality controlled data sets from the individual data-produ cing projects are delivered to the national data centres. It is recommended that data quality control should be performed by the originators and/or data centres before delivering any data sets to the research data base. Delivery of the (full) data sets should be checked and their quality should be approved by authorized data centres.

  19. Technical Specifications of Structural Health Monitoring for Highway Bridges: New Chinese Structural Health Monitoring Code

    Directory of Open Access Journals (Sweden)

    Fernando Moreu

    2018-03-01

    Full Text Available Governments and professional groups related to civil engineering write and publish standards and codes to protect the safety of critical infrastructure. In recent decades, countries have developed codes and standards for structural health monitoring (SHM. During this same period, rapid growth in the Chinese economy has led to massive development of civil engineering infrastructure design and construction projects. In 2016, the Ministry of Transportation of the People’s Republic of China published a new design code for SHM systems for large highway bridges. This document is the first technical SHM code by a national government that enforces sensor installation on highway bridges. This paper summarizes the existing international technical SHM codes for various countries and compares them with the new SHM code required by the Chinese Ministry of Transportation. This paper outlines the contents of the new Chinese SHM code and explains its relevance for the safety and management of large bridges in China, introducing key definitions of the Chinese–United States SHM vocabulary and their technical significance. Finally, this paper discusses the implications for the design and implementation of a future SHM codes, with suggestions for similar efforts in United States and other countries.

  20. Community-researcher liaisons: the Pathways to Resilience Project ...

    African Journals Online (AJOL)

    The Pathways to Resilience Project is an ongoing, community-based participatory research (CBPR) project. Its express focus is the exploration of how at-risk youths use formal services and/or informal, naturally occurring resources to beat the odds that have been stacked against them, with the intent of partnering with ...

  1. 23 CFR 420.111 - What are the documentation requirements for use of FHWA planning and research funds?

    Science.gov (United States)

    2010-04-01

    ... and Research Funds § 420.111 What are the documentation requirements for use of FHWA planning and... 23 Highways 1 2010-04-01 2010-04-01 false What are the documentation requirements for use of FHWA planning and research funds? 420.111 Section 420.111 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF...

  2. “DOSSA”, highway to energy self-sustainability

    International Nuclear Information System (INIS)

    Abejon Aparicio, Noe; Lai, Cynthia; Chan-Halbrendt, Catherine

    2012-01-01

    Highlights: ► We present a new model to achieve zero energy emissions. ► We compared with the strategic plan implemented by the University of Hawai’i at Manoa. ► Comparison scenarios are created using projections of the involved 13 variables. ► The most probable three projections are used for each variable. ► DOSSA reaches energy institutional self-sustainability an average of 23 years earlier. -- Abstract: Emphasis has been put forth in the field of applied energy towards reducing consumption, using renewable energy sources and mitigating pollution and greenhouse gas emissions. Although these strategies are striving to achieve the same goal, there is no logical model that clearly establishes their pathway to success; therefore, DOSSA, a new and innovative model, has been developed to provide this necessary central bridge of multiple pathways through five easy and adaptable steps: (1) Data inventory; (2) Objectives; (3) Staff/Committee; (4) Strategy; and (5) Accountability (DOSSA). In this study, the DOSSA model was applied and compared to the University of Hawai’i at Manoa’s (UHM’s) current strategic energy plan: to achieve zero emissions in terms of energy by the year 2050. Under proper execution of each step from the model, this study shows the effectiveness of the application of DOSSA to any goal or objective by increasing efficiency and creative and innovative approaches to problems, specifically, environmental initiatives. Through the application of DOSSA in this case study at UHM, it was projected that UHM has the potential to be completely self-sustainable in terms of energy consumption approximately 23 years earlier to its expected “strategic plan” date of 2050. Thus, DOSSA cannot only be used as an instigator for achieving reduction goals but also as an accelerator for various green initiatives – a highway to energy self-sustainability.

  3. A perspective of the Malaysian highway energy consumption and future power supply

    International Nuclear Information System (INIS)

    Saqr, Khalid M.; Musa, Md. Nor

    2011-01-01

    In this short communication, we discuss the energy consumption trends in the Malaysian road transport sector, with a special emphasis on the energy losses due to vehicle aerodynamic drag on highways. The recent trends of energy consumption in the Malaysian road transport sector are reviewed. It is evidently shown that the aerodynamic losses represented exceed 1.2 MTOE annually since 2002. A novel concept of vertical-axis wind turbine (VAWT) farms for harvesting aerodynamic energy losses on Malaysian highways is preliminarily proposed. The novel concept aims at providing a sustainable and green energy source for the lighting of the highway network in the country.

  4. Illinois highway materials sustainability efforts of 2013.

    Science.gov (United States)

    2014-08-01

    This report presents the sustainability efforts of the Illinois Department of Transportation (IDOT) in : recycling and reclaiming materials for use in highway construction. This report meets the requirements of : Illinois Public Act 097-0314 by docum...

  5. Online tutoring procedure for research project supervision: management, organization and key elements

    Directory of Open Access Journals (Sweden)

    Antònia Darder Mesquida

    2015-07-01

    Full Text Available Research project tutoring appears as a crucial element for teaching; it is a planned action based on the relationship between a tutor and a student. This paper presents the findings of a design and development research which has as its main aim to create an organization system for the tutoring of online research projects. That system seeks to facilitate the tutoring and supervision task with trainee researchers, providing guidance for its management and instruments for its implementation. The main conclusions arising from this research derive from considering the need to offer a solution to the problem of distance research project supervision and has materialized in organization and sequencing through a model about the variables that influence the research project tutoring problem.

  6. Designing Business and Technology Management Work-Packages in Cleantech Research Projects

    DEFF Research Database (Denmark)

    Tambo, Torben; Enevoldsen, Peter

    2014-01-01

    a clearer and more explicit perspective of conversion from research to business in to research project in energy storage. This paper suggests a model view on the conversion capability within cleantech research projects in order to anchor a distinctive and methodological consideration for business...

  7. Student and Faculty Outcomes of Undergraduate Science Research Projects by Geographically Dispersed Students

    Science.gov (United States)

    Shaw, Lawton; Kennepohl, Dietmar

    2013-01-01

    Senior undergraduate research projects are important components of most undergraduate science degrees. The delivery of such projects in a distance education format is challenging. Athabasca University (AU) science project courses allow distance education students to complete research project courses by working with research supervisors in their…

  8. Resource Planning and Management: Job One for Software Project Managers

    Science.gov (United States)

    2011-05-01

    negotiation based on mutual understanding of and belief i th j t t t i lAcceptancen e pro ec managemen r ang e – Project leaders need to communicate...Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that...puts the figure at $1.22 T (even more zeros) Constant barrage of project doom and gloom Optimize tomorrow today.TM …. Reasons for Project

  9. Research on evaluation of enterprise project culture based on Denison model

    Directory of Open Access Journals (Sweden)

    Yucheng Zeng

    2015-05-01

    Full Text Available Purpose: The purpose of this paper is to build enterprise project culture evaluation model and search for the best evaluation method for Chinese enterprise project culture on the basis of studying and drawing lessons from enterprise culture evaluation theory and method at home and abroad. Design/methodology/approach: Referring to the Denison enterprise culture evaluation model, this paper optimizes it according to the difference of enterprise project culture, designs the enterprise project culture evaluation model and proves the practicability of the model through empirical. Finding: This paper finds that it`s more applicable to use the Denison model for enterprise project culture evaluation through the comparative analysis of domestic and foreign enterprise culture evaluation theory and method, the systematic project culture management framework of Chinese enterprises has not yet formed through empirical research, and four factors in enterprise project culture have important influence on project operation performance improvement. Research limitations/implications: The research on evaluation of enterprise project culture based on Denison model is a preliminary attempt, the design of evaluation index system, evaluation model and scale structure also need to be improved, but the thinking of this paper in this field provides a valuable reference for future research. Practical Implications: This paper provides the support of theory and practice for evaluating the present situation of enterprise project culture construction and analyzing the advantages and disadvantages of project culture, which contributes to the "dialectical therapy" of enterprise project management, enterprise management and enterprise project culture construction. Originality/value: The main contribution of this paper is the introduction of Denison enterprise culture model. Combining with the actual situation of enterprises, this paper also builds the evaluation model for

  10. Measurements of air pollution from a Danish highway

    Energy Technology Data Exchange (ETDEWEB)

    Ellermann, T.; Solvang Jensen, S.; Ketzel, M.; Loefstroem, P. Massling, A.

    2009-07-15

    This report presents the results from a measurement campaign carried out at the Holbaek Highway during 2008. The objective of the campaign was to determine the emission factors for PM{sub 2.5} and PM{sub 10} due to highway traffic. The campaign included measurements of NO{sub x}, NO, NO{sub 2}, TEOM PM{sub 2.5}, TEOM PM{sub 10}, O{sub 3}, particle size distribution and local meteorology. The emission factors for PM{sub 2.5} and PM{sub 10} were determined to 45 and 155 mg/(vehicle km), respectively. This is comparable to the emission factors previously determined for H. C. Andersens Boulevard in Copenhagen and somewhat higher than found at Jagtvej, Copenhagen. (author)

  11. Equivalent noise level response to number of vehicles: a comparison between a high traffic flow and low traffic flow highway in Klang Valley, Malaysia

    OpenAIRE

    Halim, Herni; Abdullah, Ramdzani

    2014-01-01

    HIGHLIGHTS Highway traffic noise is a serious problem in Malaysia Heavy traffic flow highway recorded higher noise level compared to low traffic flow Noise level stabilized at certain number of vehicles on the road i.e above 500 vehicles. Although much research on road traffic noise has found that noise level increase are influenced by driver behavior and source-receiver distance, little attention has been paid to the relationship between noise level and total number of vehicles...

  12. Team research at the biology-mathematics interface: project management perspectives.

    Science.gov (United States)

    Milton, John G; Radunskaya, Ami E; Lee, Arthur H; de Pillis, Lisette G; Bartlett, Diana F

    2010-01-01

    The success of interdisciplinary research teams depends largely upon skills related to team performance. We evaluated student and team performance for undergraduate biology and mathematics students who participated in summer research projects conducted in off-campus laboratories. The student teams were composed of a student with a mathematics background and an experimentally oriented biology student. The team mentors typically ranked the students' performance very good to excellent over a range of attributes that included creativity and ability to conduct independent research. However, the research teams experienced problems meeting prespecified deadlines due to poor time and project management skills. Because time and project management skills can be readily taught and moreover typically reflect good research practices, simple modifications should be made to undergraduate curricula so that the promise of initiatives, such as MATH-BIO 2010, can be implemented.

  13. Test/QA plan for the verification testing of selective catalytic reduction control technologies for highway, nonroad use heavy-duty diesel engines

    Science.gov (United States)

    This ETV test/QA plan for heavy-duty diesel engine testing at the Southwest Research Institute’s Department of Emissions Research (DER) describes how the Federal Test Procedure (FTP), as listed in 40 CFR Part 86 for highway engines and 40 CFR Part 89 for nonroad engines, will be ...

  14. Leading Edge Aeronautics Research for NASA Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The LEARN Project explores the creation of novel concepts and processes with the potential to create new capabilities in aeronautics research through awards to the...

  15. ORGANIZATIONAL STRUCTURE OF RESEARCH PROJECT ACTIVITIES PERFORMED AT MEDICAL UNIVERSITIES IN BULGARIA.

    Directory of Open Access Journals (Sweden)

    Svetoslav Garov

    2013-07-01

    Full Text Available Introduction: There are five Bulgarian medical universities in the cities of Sofia, Plovdiv, Varna, Pleven and Stara Zagora. A major priority of medical universities is to encourage research activities mainly aimed at preparation and implementation of research projects. Projects are managed by the participating organizations called “beneficiaries”. Beneficiaries develop projects, apply for finances and if approved they implement those projects.Aim: The purpose of our study is to examine the organizational structure of research project activities on the macro level and on the micro level in Bulgarian medical universities.Material and methods: In order to define the separate elements of the organizational structure and to analyze the relations and interaction between them we have applied a documentary and sociological approach. Results: During the last six years there was a significant increase in the number and the overall annual financial value of the projects performed at medical universities in Bulgaria. The reasons for such increase are: managers realizing the advantages of and benefits from the implementation of research projects ensuring high quality modernization of research units’ equipment and facilities; access to innovative technologies; development of interdisciplinary relations, etc. Benefits arising from improved results motivate us to consider as appropriate some additional investments aimed at increasing the number of team members and further optimization of the currently existing structures (research centers in charge of research with the purpose of achieving even better results in this particular field. Conclusion: The role of research project activities in medical universities’ research field is of vital importance for the educational institutions’ success. Taking into consideration the changed conditions, European possibilities and the highly competitive environment, realizing this aspect will be essential for the

  16. Academic Researchers on the Project Market in the Ethos of Knowledge Capitalism

    Science.gov (United States)

    Brunila, Kristiina; Hannukainen, Kristiina

    2017-01-01

    How knowledge capitalism retools the scope of academic research and researchers is an issue which this article ties to the project market in the ethos of knowledge capitalism. In Finland, academic research has been forced to apply for funding in project-based activities reflecting European Union policies. The project market, which in this article…

  17. 75 FR 70348 - Notice of Availability of the Draft Environmental Impact Statement for a Proposed Project in...

    Science.gov (United States)

    2010-11-17

    ... Environmental Impact Statement for a Proposed Project in Mariposa County, CA AGENCY: Federal Highway... Restoration Project in Mariposa County, California. DATES: Public circulation of this document will begin on... project on Wednesday, December 8, 2010 between 4 p.m. and 7 p.m. in Mariposa. The location is Mariposa...

  18. The Bitterroot Ecosystem Management Research Project: What we have learned

    Science.gov (United States)

    Helen Y. Smith

    2000-01-01

    The varied topics presented in these symposium proceedings represent the diverse nature of the Bitterroot Ecosystem Management Research Project (BEMRP). Separated into six sections, the papers cover the different themes researched by BEMRP collaborators as well as brief overviews of five other ecosystem management projects. The sections are: Understanding the Ecosystem...

  19. Increasing the Value of Research: A Comparison of the Literature on Critical Success Factors for Projects, IT Projects and Enterprise Resource Planning Projects

    Directory of Open Access Journals (Sweden)

    Annie Maddison Warren

    2016-11-01

    Full Text Available Since the beginning of modern project management in the 1960s, academic researchers have sought to identify a definitive list of Critical Success Factors (CSFs, the key things that project managers must get right in order to deliver a successful product. With the advent of Information Technology (IT projects and, more recently, projects to deliver Enterprise Resource Planning (ERP systems, attention has turned to identifying definitive lists of CSFs for these more specific project types. The purpose of this paper is to take stock of this research effort by examining how thinking about each type of project has evolved over time, before producing a consolidated list of CSFs for each as a basis for comparison. This process reveals a high degree of similarity, leading to the conclusion that the goal of identifying a generic list of CSFs for project management has been achieved. Therefore, rather than continuing to describe lists of CSFs, researchers could increase the value of their contribution by taking a step forward and focusing on why, despite this apparent knowledge of how to ensure their success, ERP projects continue to fail.

  20. DEVELOPMENT OF A METADATA MANAGEMENT SYSTEM FOR AN INTERDISCIPLINARY RESEARCH PROJECT

    Directory of Open Access Journals (Sweden)

    C. Curdt

    2012-07-01

    Full Text Available In every interdisciplinary, long-term research project it is essential to manage and archive all heterogeneous research data, produced by the project participants during the project funding. This has to include sustainable storage, description with metadata, easy and secure provision, back up, and visualisation of all data. To ensure the accurate description of all project data with corresponding metadata, the design and implementation of a metadata management system is a significant duty. Thus, the sustainable use and search of all research results during and after the end of the project is particularly dependent on the implementation of a metadata management system. Therefore, this paper will describe the practical experiences gained during the development of a scientific research data management system (called the TR32DB including the corresponding metadata management system for the multidisciplinary research project Transregional Collaborative Research Centre 32 (CRC/TR32 'Patterns in Soil-Vegetation-Atmosphere Systems'. The entire system was developed according to the requirements of the funding agency, the user and project requirements, as well as according to recent standards and principles. The TR32DB is basically a combination of data storage, database, and web-interface. The metadata management system was designed, realized, and implemented to describe and access all project data via accurate metadata. Since the quantity and sort of descriptive metadata depends on the kind of data, a user-friendly multi-level approach was chosen to cover these requirements. Thus, the self-developed CRC/TR32 metadata framework is designed. It is a combination of general, CRC/TR32 specific, as well as data type specific properties.

  1. Data management for community research projects: A JGOFS case study

    Science.gov (United States)

    Lowry, Roy K.

    1992-01-01

    Since the mid 1980s, much of the marine science research effort in the United Kingdom has been focused into large scale collaborative projects involving public sector laboratories and university departments, termed Community Research Projects. Two of these, the Biogeochemical Ocean Flux Study (BOFS) and the North Sea Project incorporated large scale data collection to underpin multidisciplinary modeling efforts. The challenge of providing project data sets to support the science was met by a small team within the British Oceanographic Data Centre (BODC) operating as a topical data center. The role of the data center was to both work up the data from the ship's sensors and to combine these data with sample measurements into online databases. The working up of the data was achieved by a unique symbiosis between data center staff and project scientists. The project management, programming and data processing skills of the data center were combined with the oceanographic experience of the project communities to develop a system which has produced quality controlled, calibrated data sets from 49 research cruises in 3.5 years of operation. The data center resources required to achieve this were modest and far outweighed by the time liberated in the scientific community by the removal of the data processing burden. Two online project databases have been assembled containing a very high proportion of the data collected. As these are under the control of BODC their long term availability as part of the UK national data archive is assured. The success of the topical data center model for UK Community Research Project data management has been founded upon the strong working relationships forged between the data center and project scientists. These can only be established by frequent personal contact and hence the relatively small size of the UK has been a critical factor. However, projects covering a larger, even international scale could be successfully supported by a

  2. Alternative routes for highway shipments of radioactive materials and lessons learned from state designations

    International Nuclear Information System (INIS)

    1990-07-01

    Pursuant to the Hazardous Materials Transportation Act (HMTA), the Department of Transportation (DOT) has promulgated a comprehensive set of regulations regarding the highway transportation of high-level radioactive materials. These regulations, under docket numbers HM-164 and HM-164A, establish interstate highways as the preferred routes for the transportation of radioactive materials within and through the states. The regulations also provide a methodology by which a state may select altemative routes. First, the state must establish a ''state routing agency'', defined as an entity authorized to use the state legal process to impose routing requirements on carriers of radioactive material (49 CFR 171.8). Once identified, the state routing agency must select routes in accordance with DOTs Guidelines for Selecting Preferred Highway Routes for Large Quantity Shipments of Radioactive Materials or an equivalent routing analysis. Adjoining states and localities should be consulted on the impact of proposed alternative routes as a prerequisite of final route selection. Lastly, the states must provide written notice to DOT of any alternative route designation before the routes are deemed effective. The purpose of this report is to discuss the ''lessons learned'' by the five states within the southern region that have designated alternative or preferred routes under the regulations of the Department of Transportation (DOT) established for the transportation of radioactive materials. The document was prepared by reviewing applicable federal laws and regulations, examining state reports and documents and contacting state officials and routing agencies involved in making routing decisions. In undertaking this project, the Southern States Energy Board hopes to reveal the process used by states that have designated alternative routes and thereby share their experiences (i.e., lessons learned) with other southern states that have yet to make designations

  3. Managing Risk and Uncertainty in Large-Scale University Research Projects

    Science.gov (United States)

    Moore, Sharlissa; Shangraw, R. F., Jr.

    2011-01-01

    Both publicly and privately funded research projects managed by universities are growing in size and scope. Complex, large-scale projects (over $50 million) pose new management challenges and risks for universities. This paper explores the relationship between project success and a variety of factors in large-scale university projects. First, we…

  4. Nuclear safety research project. Annual report 1995

    International Nuclear Information System (INIS)

    Hueper, R.

    1996-08-01

    The reactor safety R and D work of the Karlsruhe Research Centre (FZK) has been part of the Nuclear Safety Research Project (PSF) since 1990. The present annual report 1995 summarizes the R and D results. The research tasks are coordinated in agreement with internal and external working groups. The contributions to this report correspond to the status of early 1996. An abstract in English precedes each of them, whenever the respective article is written in German. (orig.) [de

  5. Proposed methodology for estimating the impact of highway improvements on urban air pollution.

    Science.gov (United States)

    1971-01-01

    The aim of this methodology is to indicate the expected change in ambient air quality in the vicinity of a highway improvement and in the total background level of urban air pollution resulting from the highway improvement. Both the jurisdiction in w...

  6. Patient participation in ERS guidelines and research projects: the EMBARC experience.

    Science.gov (United States)

    Chalmers, James D; Timothy, Alan; Polverino, Eva; Almagro, Marta; Ruddy, Thomas; Powell, Pippa; Boyd, Jeanette

    2017-09-01

    The European Multicentre Bronchiectasis Audit and Research Collaboration (EMBARC) is a European Respiratory Society (ERS) Clinical Research Collaboration dedicated to improving research and clinical care for people with bronchiectasis. EMBARC has created a European Bronchiectasis Registry, funded by the ERS and by the European Union (EU) Innovative Medicines Initiative Programme. From the outset, EMBARC had the ambition to be a patient-focussed project. In contrast to many respiratory diseases, however, there are no specific patient charities or European patient organisations for patients with bronchiectasis and no existing infrastructure for patient engagement. This article describes the experience of EMBARC and the European Lung Foundation in establishing a patient advisory group and then engaging this group in European guidelines, an international registry and a series of research studies. Patient involvement in research, clinical guidelines and educational activities is increasingly advocated and increasingly important. Genuine patient engagement can achieve a number of goals that are critical to the success of an EU project, including focussing activities on patient priorities, allowing patients to direct the clinical and research agenda, and dissemination of guidelines and research findings to patients and the general public. Here, we review lessons learned and provide guidance for future ERS task forces, EU-funded projects or clinical research collaborations that are considering patient involvement. To understand the different ways in which patients can contribute to clinical guidelines, research projects and educational activities.To understand the barriers and potential solutions to these barriers from a physician's perspective, in order to ensure meaningful patient involvement in clinical projects.To understand the barriers and potential solutions from a patient's perspective, in order to meaningfully involve patients in clinical projects.

  7. The Ongkharak Nuclear Research Center (ONRC) research reactor project: a status review

    International Nuclear Information System (INIS)

    Rusch, R.; Jacobi, A. Jr.; Yamkate, P.

    2001-01-01

    The new Ongkharak Nuclear Research Center in the vicinity of Bangkok, Thailand is planned to replace the more than 30 years old facilities located in the Chatuchak district, Bangkok. An international team led by general atomics (GA) is designing and constructing the new research complex. It comprises a 10 MW TRIGA type reactor, an isotope production and a centralized waste processing and storage facility. Electrowatt-Ekono Ltd. was hired by the Thai Government Agency, the Office of Atomic Energy for Peace (OAEP), as a consultant to the project. As the project is now approaching the end of its 4 th year, it now stands at a decisive turning point. Basic design is nearly completed and detailed design is well advanced. The turnkey part of the contract including the reactor island, the isotope and waste facilities are still awaiting the issuance of the Construction Permit. Significant progress has been made on the other part of the project, which includes all the supporting infrastructure facilities. The Preliminary Safety Analysis Report (PSAR), prepared by GA, has been reviewed by various parties, including by nuclear safety experts from the IAEA, which has provided continuous support to the OAEP. Experts from the Argonne National Laboratory have been involved in the reviews as well. The PSAR is now under consideration at the Nuclear Facility Safety Sub-Committee (NFSS) of the Thai Atomic Energy for Peace Commission for issuing the Construction Permit of the ONRC Research Reactor. The following paper gives an overview of the project and its present status, outlining the features of the planned facilities and the issues the project is presently struggling with. Major lessons of the past 4 years are highlighted and an outlook into the future is attempted. (orig.)

  8. Fatal accidents in nighttime vs. daytime highway construction work zones.

    Science.gov (United States)

    Arditi, David; Lee, Dong-Eun; Polat, Gul

    2007-01-01

    Awareness about worker safety in nighttime construction has been a major concern because it is believed that nighttime construction creates hazardous work conditions. However, only a few studies provide valuable comparative information about accident characteristics of nighttime and daytime highway construction activities. This study investigates fatal accidents that occurred in Illinois highway work zones in the period 1996-2001 in order to determine the safety differences between nighttime and daytime highway construction. The lighting and weather conditions were included into the study as control parameters to see their effects on the frequency of fatal accidents occurring in work zones. According to this study, there is evidence that nighttime construction is more hazardous than daytime construction. The inclusion of a weather parameter into the analysis has limited effect on this finding. The study justifies establishing an efficient work zone accident reporting system and taking all necessary measures to enhance safety in nighttime work zones.

  9. Removal of Heavy Metals and PAH in Highway Detention Ponds

    DEFF Research Database (Denmark)

    Bentzen, Thomas Ruby; Larsen, Torben; Thorndahl, Søren Liedtke

    2005-01-01

    , which has been designed according to standard design criteria for several decades. The study will focus on heavy metals (Cd, Cr, Cu, Pb and Zn) and polyaromatic hydrocarbons (PAH). The long-term simulation of input of flow and pollution to the ponds will be a hind cast based on time series of historical......The paper presents some of the first results from a study of the removal of pollutants in highway detention ponds in Denmark. The objective of the study is to set up a procedure for long-term modelling of discharges of pollutants to the environment from the many Danish highway detention ponds...... rainfalls. The modelling will take place in a special version of the MIKE URBAN. The modelling is calibrated and validated on measurements from selected highway catchments. The removal of pollutants in the ponds is studied by local measurements in combination with CFD modelling using the MIKE 21 and MIKE 3...

  10. THE CONTRIBUTION OF RESEARCH INSTITUTES IN EUREKA PROJECTS

    NARCIS (Netherlands)

    VANROSSUM, W; CABO, PG

    1995-01-01

    Technological cooperation between industrial firms and research institutes is studied at the project level. The various forms of cooperation, and the instances in which they are advantageous, are discussed. The authors then focus on situations in which the research institute acts as 'knowledge

  11. Group-Effort Applied Research (GEAR): Expanding Opportunities for Undergraduate Research Through Original, Class-Based Research Projects

    Science.gov (United States)

    Moore, Sean D.; Teter, Ken

    2014-01-01

    Undergraduate research clearly enriches the educational development of participating students, but these experiences are limited by the inherent inefficiency of the standard one student - one mentor model for undergraduate research. Group-Effort Applied Research (GEAR) was developed as a strategy to provide substantial numbers of undergraduates with meaningful research experiences. The GEAR curriculum delivers concept-driven lecture material and provides hands-on training in the context of an active research project from the instructor's lab. Because GEAR is structured as a class, participating students benefit from intensive, supervised research training that involves a built-in network of peer support and abundant contact with faculty mentors. The class format also ensures a relatively standardized and consistent research experience. Furthermore, meaningful progress toward a research objective can be achieved more readily with GEAR than with the traditional one student - one mentor model of undergraduate research because sporadic mistakes by individuals in the class are overshadowed by the successes of the group as a whole. Three separate GEAR classes involving three distinct research projects have been offered to date. In this paper, we provide an overview of the GEAR format and review some of the recurring themes for GEAR instruction. We propose GEAR can serve as a template to expand student opportunities for life science research without sacrificing the quality of the mentored research experience. PMID:24898007

  12. 75 FR 39820 - Procedures for Abatement of Highway Traffic Noise and Construction Noise

    Science.gov (United States)

    2010-07-13

    ...-2008-0114] RIN 2125-AF26 Procedures for Abatement of Highway Traffic Noise and Construction Noise... the Federal regulations on the Procedures for Abatement of Highway Traffic Noise and Construction Noise. The final rule clarifies and adds definitions, the applicability of this regulation, certain...

  13. Abstracts and research accomplishments of university coal research projects

    Energy Technology Data Exchange (ETDEWEB)

    1991-06-01

    The Principal Investigators of the grants supported by the University Coal Research Program were requested to submit abstracts and highlight accomplishments of their projects in time for distribution at a grantees conference. This book is a compilation of the material received in response to the request. Abstracts discuss the following area: coal science, coal surface science, reaction chemistry, advanced process concepts, engineering fundamentals and thermodynamics, environmental science.

  14. Abstracts and research accomplishments of university coal research projects

    International Nuclear Information System (INIS)

    1991-06-01

    The Principal Investigators of the grants supported by the University Coal Research Program were requested to submit abstracts and highlight accomplishments of their projects in time for distribution at a grantees conference. This book is a compilation of the material received in response to the request. Abstracts discuss the following area: coal science, coal surface science, reaction chemistry, advanced process concepts, engineering fundamentals and thermodynamics, environmental science

  15. Federal Highway Administration 100-year coating study.

    Science.gov (United States)

    2012-11-01

    The Federal Highway Administration 100-Year Coating Study was initiated in August 2009 to search for durable : coating systems at a reasonable cost. The objective of the study was to identify and evaluate coating materials that can : provide 100 year...

  16. New highway accident location manual for Missouri.

    Science.gov (United States)

    2013-12-01

    The Missouri HAL manual is used to identify, analyze, and correct high crash locations, and has not been updated since : 1999. This new edition brings the manual up to date, while incorporating the methodology of the national Highway Safety : Manual ...

  17. Talking About The Smokes: a large-scale, community-based participatory research project.

    Science.gov (United States)

    Couzos, Sophia; Nicholson, Anna K; Hunt, Jennifer M; Davey, Maureen E; May, Josephine K; Bennet, Pele T; Westphal, Darren W; Thomas, David P

    2015-06-01

    To describe the Talking About The Smokes (TATS) project according to the World Health Organization guiding principles for conducting community-based participatory research (PR) involving indigenous peoples, to assist others planning large-scale PR projects. The TATS project was initiated in Australia in 2010 as part of the International Tobacco Control Policy Evaluation Project, and surveyed a representative sample of 2522 Aboriginal and Torres Strait Islander adults to assess the impact of tobacco control policies. The PR process of the TATS project, which aimed to build partnerships to create equitable conditions for knowledge production, was mapped and summarised onto a framework adapted from the WHO principles. Processes describing consultation and approval, partnerships and research agreements, communication, funding, ethics and consent, data and benefits of the research. The TATS project involved baseline and follow-up surveys conducted in 34 Aboriginal community-controlled health services and one Torres Strait community. Consistent with the WHO PR principles, the TATS project built on community priorities and strengths through strategic partnerships from project inception, and demonstrated the value of research agreements and trusting relationships to foster shared decision making, capacity building and a commitment to Indigenous data ownership. Community-based PR methodology, by definition, needs adaptation to local settings and priorities. The TATS project demonstrates that large-scale research can be participatory, with strong Indigenous community engagement and benefits.

  18. ENSAR, a Nuclear Science Project for European Research Area

    NARCIS (Netherlands)

    Turzó, Ketel; Lewitowicz, Marek; Harakeh, Muhsin N.

    2015-01-01

    During the period from September 2010 to December 2014, the European project European Nuclear Science and Applications Research (ENSAR) coordinated research activities of the Nuclear Physics community performing research in three major subfields: Nuclear Structure, Nuclear Astrophysics, and Nuclear

  19. Project for a renewable energy research centre

    Directory of Open Access Journals (Sweden)

    Andrea Giachetta

    2011-04-01

    Full Text Available In Liguria, where sustainable approaches to the design, construction and management of buildings enjoy scant currency, the idea of a company from Milan (FERA s.r.l. setting up a research centre for studies into renewable energy resources, could well open up very interesting development opportunities.The project includes: environmental rehabilitation (restoration projects; strategies for the protection of water resources and waste management systems; passive and active solar systems (solar thermal and experiments with thermodynamic solar energy; hyperinsulation systems, passive cooling of buildings; use of natural materials; bio-climatic use of vegetation. The author describes the project content within the context of the multidisciplinary work that has gone into it.

  20. Crowdfunding Campaigns Help Researchers Launch Projects and Generate Outreach.

    Science.gov (United States)

    Dahlhausen, Katherine; Krebs, Bethany L; Watters, Jason V; Ganz, Holly H

    2016-03-01

    Organizers of participatory research (citizen science) projects can generate funds and outreach through crowdfunding. Here we provide insights from three successful science crowdfunding campaigns recently completed on Indiegogo, Experiment, and Kickstarter. Choosing a crowdfunding platform that fits the project is just the beginning; a successful campaign reflects its content, management, and marketing, and some researchers may need to acquire new skills. In addition, the growing trend of crowdfunding for science reinforces the importance of academic engagement with social media.

  1. Research project management 101: insiders' tips from Early Career Scientists

    Science.gov (United States)

    Cristini, Luisa; Pabortsava, Katsiaryna; Stichel, Torben

    2016-04-01

    From the very beginning of their career, it is important for Early Career Scientists (ECS) to develop project management skills to be able to organise their research efficiently. ECS are often in charge of specific tasks within their projects or for their teams. However, without specific training or tools, the successful completion of these assignments will depend entirely on the organisational skills of individual researchers. ECS are thus facing "sink-or-swim" situations, which can be either instructive or disastrous for their projects. Here we provide experience-based tips from fellow ECS that can help manage various project activities, including: 1. Communication with supervisors and peers 2. Lab management 3. Field trips (e.g., oceanographic campaigns) 4. Internships and collaborations with other institutions 5. Literature/background research 6. Conference convening These are potential "life buoys" for ECS, which will help them to carry out these tasks efficiently and successfully.

  2. 23 CFR 661.23 - How will a bridge project be programmed for funding once eligibility has been determined?

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false How will a bridge project be programmed for funding once... bridge project be programmed for funding once eligibility has been determined? (a) All projects will be... time, the project will be acknowledged as either BIA and Tribally owned, or non-BIA owned and placed in...

  3. Data Model and Relational Database Design for Highway Runoff Water-Quality Metadata

    Science.gov (United States)

    Granato, Gregory E.; Tessler, Steven

    2001-01-01

    A National highway and urban runoff waterquality metadatabase was developed by the U.S. Geological Survey in cooperation with the Federal Highway Administration as part of the National Highway Runoff Water-Quality Data and Methodology Synthesis (NDAMS). The database was designed to catalog available literature and to document results of the synthesis in a format that would facilitate current and future research on highway and urban runoff. This report documents the design and implementation of the NDAMS relational database, which was designed to provide a catalog of available information and the results of an assessment of the available data. All the citations and the metadata collected during the review process are presented in a stratified metadatabase that contains citations for relevant publications, abstracts (or previa), and reportreview metadata for a sample of selected reports that document results of runoff quality investigations. The database is referred to as a metadatabase because it contains information about available data sets rather than a record of the original data. The database contains the metadata needed to evaluate and characterize how valid, current, complete, comparable, and technically defensible published and available information may be when evaluated for application to the different dataquality objectives as defined by decision makers. This database is a relational database, in that all information is ultimately linked to a given citation in the catalog of available reports. The main database file contains 86 tables consisting of 29 data tables, 11 association tables, and 46 domain tables. The data tables all link to a particular citation, and each data table is focused on one aspect of the information collected in the literature search and the evaluation of available information. This database is implemented in the Microsoft (MS) Access database software because it is widely used within and outside of government and is familiar to many

  4. Vehicles In Highway Communication System Using ZigBee And Bluetooth Network

    Directory of Open Access Journals (Sweden)

    EiThuzarKhin

    2015-06-01

    Full Text Available Abstract Globally many vehicle types operate on the highway system. And highway infrastructure stakeholders have developed a number of products intended to facilitate the identification of critical assets and provide guidance for conductiong security planning. Many of these productsare conducted as joint efforts between the state highway agencies.The main aim of the system is to have a network between Roadside Unit RSU and On-Board Unit OBU and between On-Board Unit OBU and another On-Board Unit OBU . ZigBee is a consortium of software hardware and services companies having improved a common standard for wireless networking of sensors and microcontrollers.Bluetooth is a technology of wireless standard for exchanging data for short distances. In this article we point out sending data to the drivers via not only ZigBee module but also Bluetooth module.

  5. Summary results of an assessment of research projects in the Nuclear Medicine Research program

    International Nuclear Information System (INIS)

    1988-01-01

    In May 1987, OHER management requested the Office of Program Analysis (OPA) to conduct a peer review of the projects of the DOE Nuclear Medicine Research program. This was done using procedures and a quantitative methodology OPA developed for assessing DOE research programs. Sixty-three individual nuclear medicine projects were reviewed by seven panels; one panel on isotopes and radioisotopes, three on radiopharmacology, two on clinical feasibility, and one on instrumentation. Each panel consisted of five to ten knowledgeable reviewers. 5 figs

  6. Supporting research projects via student workshops

    DEFF Research Database (Denmark)

    Marschall, Max; Schmeck, Michel; Gengnagel, Christoph

    2016-01-01

    As part of a joint research project between the Centre for Information Technology and Architecture (CITA) and te Department for Structural Design and Technology (KET), a one week student workshop was organised at the Royal Danish Academy of Fine Arts (KADK) in Copenhagen. This paper outlines...... the teaching methods applied to reach maximum insight from student interaction, despite the unfamiliarity the students had with the research matter: physical and numeric form-finding for lightweight hybrid structures. Hybrid structures are defined here as combining different components of low stiffness...

  7. I and C safety research at the OECD Halden reactor project

    International Nuclear Information System (INIS)

    Gran, B.A.

    2007-01-01

    The overall objective of the Halden Reactor Project research on software systems dependability is to contribute to the successful introduction of digital I and C systems into NPPs. When celebrating the 50 years of the Halden Project in 2008, about 100 written reports have been delivered within this research. This research covers a number of topics covering safety, reliability, validation and verification, quality assurance, risk assessment, requirement engineering, error propagation, qualitative and quantitative assessment. In the paper some activities are described, pinpointing the importance of good joint projects with organisations in the member countries

  8. Wandering and deliruim in highway wanderers / Errância e delírio em andarilhos de estrada

    Directory of Open Access Journals (Sweden)

    José Sterza Justo

    2005-01-01

    Full Text Available Wanderers often walk across the highways without destiny, like nomadic that renounce geographical, psychological and social establishments. It is not rare to find wanderers with manifestation of visions and delirious thoughts. We intend to research possible connections between the constant moving of wanderers and the outbreak of the delirious. We collected and analyzed the wanderers' talks, specifically exploring the allusive contents to the representation of themselves, of their world and of their walk across the highways. Persecution, megalomania and depression ideas, super invested of affect, often appeared in their thoughts about present, past and in their reflections about the origins of constant moving. The results suggest that there is a strong relation between constant and without destiny moving and the delirious ideas and visions that emerge inside them.

  9. A comprehensive crop genome research project: the Superhybrid Rice Genome Project in China.

    Science.gov (United States)

    Yu, Jun; Wong, Gane Ka-Shu; Liu, Siqi; Wang, Jian; Yang, Huanming

    2007-06-29

    In May 2000, the Beijing Institute of Genomics formally announced the launch of a comprehensive crop genome research project on rice genomics, the Chinese Superhybrid Rice Genome Project. SRGP is not simply a sequencing project targeted to a single rice (Oryza sativa L.) genome, but a full-swing research effort with an ultimate goal of providing inclusive basic genomic information and molecular tools not only to understand biology of the rice, both as an important crop species and a model organism of cereals, but also to focus on a popular superhybrid rice landrace, LYP9. We have completed the first phase of SRGP and provide the rice research community with a finished genome sequence of an indica variety, 93-11 (the paternal cultivar of LYP9), together with ample data on subspecific (between subspecies) polymorphisms, transcriptomes and proteomes, useful for within-species comparative studies. In the second phase, we have acquired the genome sequence of the maternal cultivar, PA64S, together with the detailed catalogues of genes uniquely expressed in the parental cultivars and the hybrid as well as allele-specific markers that distinguish parental alleles. Although SRGP in China is not an open-ended research programme, it has been designed to pave a way for future plant genomics research and application, such as to interrogate fundamentals of plant biology, including genome duplication, polyploidy and hybrid vigour, as well as to provide genetic tools for crop breeding and to carry along a social burden-leading a fight against the world's hunger. It began with genomics, the newly developed and industry-scale research field, and from the world's most populous country. In this review, we summarize our scientific goals and noteworthy discoveries that exploit new territories of systematic investigations on basic and applied biology of rice and other major cereal crops.

  10. Childhood Obesity Research Demonstration project: Cross-site evaluation method

    Science.gov (United States)

    The Childhood Obesity Research Demonstration (CORD) project links public health and primary care interventions in three projects described in detail in accompanying articles in this issue of Childhood Obesity. This article describes a comprehensive evaluation plan to determine the extent to which th...

  11. VEHICLE DRIVING CYCLE OPTIMISATION ON THE HIGHWAY

    Directory of Open Access Journals (Sweden)

    Zinoviy STOTSKO

    2016-06-01

    Full Text Available This paper is devoted to the problem of reducing vehicle energy consumption. The authors consider the optimisation of highway driving cycle a way to use the kinetic energy of a car more effectively at various road conditions. The model of a vehicle driving control at the highway which consists of elementary cycles, such as accelerating, free rolling and deceleration under forces of external resistance, was designed. Braking, as an energy dissipation regime, was not included. The influence of the various longitudinal profiles of the road was taken into consideration and included in the model. Ways to use the results of monitoring road and traffic conditions are presented. The method of non-linear programming is used to design the optimal vehicle control function and phase trajectory. The results are presented by improved typical driving cycles that present energy saving as a subject of choice at a specified schedule.

  12. Accumulation of Pollutants in Highway Detention Ponds

    DEFF Research Database (Denmark)

    Bentzen, Thomas Ruby

    single rain event. From the hindcast results it is possible to calculate mean water and pollutant loads. This method is commonly used in urban drainage systems for capacity analysis or for prediction of CSO's. The challenge is to develop a simplified and still accurate description of flow and transport......This PhD study deals with issues related to water and pollutant transport from highway surfaces caused by rain. It is essential in the study to apply methods and models in which improvements in relation to removal of pollutants can be identified and to be able to predict the yearly discharges....... Measurements of water and pollutant transport are carried out in different highway systems. A geometrically well-defined test pond is established, wherein the deposition of particulate matter can be measured. The result from the test pond is transferred to real detention ponds in which the three...

  13. 7 CFR 985.31 - Research and development proj-ects.

    Science.gov (United States)

    2010-01-01

    ..., may establish or provide for the establishment of production research, marketing research and... 7 Agriculture 8 2010-01-01 2010-01-01 false Research and development proj-ects. 985.31 Section 985.31 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING...

  14. Crowdfunding Campaigns Help Researchers Launch Projects and Generate Outreach

    Directory of Open Access Journals (Sweden)

    Katherine Dahlhausen

    2015-11-01

    Full Text Available Organizers of participatory research (citizen science projects can generate funds and outreach through crowdfunding. Here we provide insights from three successful science crowdfunding campaigns recently completed on Indiegogo, Experiment, and Kickstarter. Choosing a crowdfunding platform that fits the project is just the beginning; a successful campaign reflects its content, management, and marketing, and some researchers may need to acquire new skills. In addition, the growing trend of crowdfunding for science reinforces the importance of academic engagement with social media.

  15. The ADVANCE project: Insights and achievments

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    ADVANCE [Advanced Driver and Vehicle Advisory Navigation ConcEpt] was a public/private partnership conceived and developed by four founding parties. The founding parties include the Federal Highway Administration (FHWA), the Illinois Department of Transportation (IDOT), the University of Illinois at Chicago and Northwestern University operating together under the auspices of the Illinois Universities Transportation Research Consortium (IUTRC), and Motorola, Inc. The major responsibilities of each party are fully described in the Project agreement. Subsequently, these four were joined on the Steering Committee by the American Automobile Association (AAA). This unique blending of public sector, private sector and university interests, augmented by more than two dozen other private sector participants, provided a strong set of resources for ADVANCE. The ADVANCE test area covered over 300 square miles including portions of the City of Chicago and 40 northwest suburban communities. The Project encompasses the high growth areas adjacent to O`Hare International Airport, the Schaumburg/Hoffman Estates office and retail complexes, and the Lake-Cook Road development corridor. It also includes major sports and entertainment complexes such as the Arlington International Racecourse and the Rosemont Horizon. The population in the area is more than 750,000. The Insights and Perspectives Compendium is intended to provide useful information to project managers, system developers, and system integrators of future similar ITS implementations. It is intended for those that are technically interested in the ADVANCE Project and have a basic understanding of the project.

  16. Collaboration in research and the influential factors in Golestan University of Medical Sciences research projects (2005-2007): an academic sample from Iran.

    Science.gov (United States)

    Borghei, Afsaneh; Qorbani, Mostafa; Rezapour, Aziz; Majdzadeh, Reza; Nedjat, Saharnaz; Asayesh, Hamid; Mansourian, Morteza; Noroozi, Mahdi; Jahahgir, Fereydoon

    2013-08-01

    Number of Iranian articles published in ISI journals has increased significantly in recent years.Despite the quantitative progress, studies performed in Iran represent low collaboration in research; therefore,we decided to evaluate collaboration in Golestan University of Medical Sciences (GOUMS) research projects. In this cross-sectional study, all GOUMS research projects that had got grants from the universitybetween 2005-2007 were studied. Among 107 research projects included in our study, 102 projects were evaluatedand checklists were completed. The researcher's questionnaire was sent to the principle investigators (n=46) of the projects and eventually 40 questionnaires were collected. The review of 102 research proposals shows that 10 projects (9.8%) have been performed in collaborationwith other organizations. Scientific outputs in these projects have been more than projects which wereconfined to the university (98% compare to 68%; p= 0.04). The total cost of the projects under study was a littlemore than 300,000 US$. In just 12 projects (11.8%) a part of the cost had been provided by organizations outsidethe university. About 50% of researchers declared that they had chosen their research topic based on their"personal interest". Only 1 project was performed by the demand of nongovernmental organizations and 12 researchersreported no collaboration in their activities. This study shows that collaboration in GOUMS research projects is low. Moreover, collaborationswith governmental and nongovernmental organizations are trivial. The scientific outputs in collaborativeresearch projects are much more than other projects.

  17. Energy research information system projects report, volume 5, number 1

    Science.gov (United States)

    Johnson, J.; Schillinger, L.

    1980-07-01

    The system (ERIS) provides an inventory of the energy related programs and research activities from 1974 to the present in the states of Montana, Nebraska, North Dakota, South Dakota and Wyoming. Areas of research covered include coal, reclamation, water resources, environmental impacts, socioeconomic impacts, energy conversion, mining methodology, petroleum, natural gas, oilshale, renewable energy resources, nuclear energy, energy conservation and land use. Each project description lists title, investigator(s), research institution, sponsor, funding, time frame, location, a descriptive abstract of the research and title reports and/or publications generated by the research. All projects are indexed by location, personal names, organizations and subject keywords.

  18. 23 CFR 661.31 - Do IRRBP projects have to be listed on an approved IRR TIP?

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Do IRRBP projects have to be listed on an approved IRR... ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.31 Do IRRBP projects have to be listed on an approved IRR TIP? Yes. All IRRBP projects must be listed on an approved IRR TIP. The...

  19. A German research project about applicable graphite cutting techniques

    International Nuclear Information System (INIS)

    Holland, D.; Quade, U.; Bach, F.W.; Wilk, P.

    2001-01-01

    In Germany, too, quite large quantities of irradiated nuclear graphite, used in research and prototype reactors, are waiting for an environmental way of disposal. While incineration of nuclear graphite does not seem to be a publicly acceptable way, cutting and packaging into ductile cast iron containers could be a suitable way of disposal in Germany. Nevertheless, the cutting of graphite is also a very difficult technique by which a large amount of secondary waste or dust might occur. An applicable graphite cutting technique is needed. Therefore, a group of 13 German partners, consisting of one university, six research reactor operators, one technical inspection authority, three engineering companies, one industrial cutting specialist and one commercial dismantling company, decided in 1999 to start a research project to develop an applicable technique for cutting irradiated nuclear graphite. Aim of the project is to find the most suitable cutting techniques for the existing shapes of graphite blocks with a minimum of waste production rate. At the same time it will be learned how to sample the dust and collect it in a filter system. The following techniques will be tested and evaluated: thermal cutting, water jet cutting, mechanical cutting with a saw, plasma arc cutting, drilling. The subsequent evaluation will concentrate on dust production, possible irradiation of staff, time and practicability under different constraints. This research project is funded by the German Minister of Education and Research under the number 02 S 7849 for a period of two years. A brief overview about the work to be carried out in the project will be given. (author)

  20. Contribuições das técnicas projetivas gráficas para a compreensão da personalidade de andarilhos de estrada Contributions of graphic projective techniques for the understanding of highway wanderers' personality

    Directory of Open Access Journals (Sweden)

    Rodrigo Sanches Peres

    2005-08-01

    Full Text Available Estudos indicam que a deserção que caracteriza o estilo de vida dos andarilhos de estrada é multifatorial e envolve fatores sócio-econômicos e psicológicos. O presente estudo visou investigar as principais características da personalidade de andarilhos de estrada. Para tanto, aplicou-se a Bateria de Grafismos de Hammer em 23 andarilhos albergados em uma instituição assistencial. O material coletado foi avaliado e interpretado em função dos critérios de atribuição de significados fornecidos pela literatura científica especializada. Os dados obtidos indicam que os sujeitos possuem uma imagem corporal comprometida por sentimentos de inferioridade e inadequação e uma organização afetiva marcada por conflitos de ordem sexual, pela utilização de mecanismos de defesa primários e por uma veemente tendência ao isolamento nas relações interpessoais. Tais resultados fornecem subsídios para o delineamento de algumas características de personalidade dos sujeitos estudados. Não obstante, a corroboração das hipóteses em questão depende da realização de novos estudos empíricos.Research results indicate that the highway wanderers' desertion involves socioeconomic and psychological factors. The objective of the present study was the investigation of the highway wanderers' personality. For so much, the Hammers' Graphic Battery was applied to a group of 23 highway wanderers sheltered in an caring institution. The collected data was evaluated and interpreted by the utilization of meanings attribution's criteria supplied by the scientific literature. Data analysis indicate that the participants possess a corporal image committed by inferiority feelings and inadequacy and an affective organization marked by sexual conflicts, primary defense mechanisms and a vehement tendency to isolation in interpersonal relationships. Such results supply subsidies for the understanding of some personality characteristics of the researched