WorldWideScience

Sample records for hierarchical production planning

  1. Hierarchical production planning for consumer goods

    NARCIS (Netherlands)

    Kok, de A.G.

    1990-01-01

    Abstract In this paper the mathematical logic behind a hierarchical planning procedure is discussed. The planning procedure is used to derive production volumes of consumer products. The essence of the planning procedure is that first a commitment is made concerning the production volume for a

  2. Ways of looking ahead: hierarchical planning in language production.

    Science.gov (United States)

    Lee, Eun-Kyung; Brown-Schmidt, Sarah; Watson, Duane G

    2013-12-01

    It is generally assumed that language production proceeds incrementally, with chunks of linguistic structure planned ahead of speech. Extensive research has examined the scope of language production and suggests that the size of planned chunks varies across contexts (Ferreira & Swets, 2002; Wagner & Jescheniak, 2010). By contrast, relatively little is known about the structure of advance planning, specifically whether planning proceeds incrementally according to the surface structure of the utterance, or whether speakers plan according to the hierarchical relationships between utterance elements. In two experiments, we examine the structure and scope of lexical planning in language production using a picture description task. Analyses of speech onset times and word durations show that speakers engage in hierarchical planning such that structurally dependent lexical items are planned together and that hierarchical planning occurs for both direct and indirect dependencies. Copyright © 2013 Elsevier B.V. All rights reserved.

  3. Hierarchical Planning Methodology for a Supply Chain Management

    Directory of Open Access Journals (Sweden)

    Virna ORTIZ-ARAYA

    2012-01-01

    Full Text Available Hierarchical production planning is a widely utilized methodology for real world capacitated production planning systems with the aim of establishing different decision–making levels of the planning issues on the time horizon considered. This paper presents a hierarchical approach proposed to a company that produces reusable shopping bags in Chile and Perú, to determine the optimal allocation of resources at the tactical level as well as over the most immediate planning horizon to meet customer demands for the next weeks. Starting from an aggregated production planning model, the aggregated decisions are disaggregated into refined decisions in two levels, using a couple of optimization models that impose appropriate constraints to keep coherence of the plan on the production system. The main features of the hierarchical solution approach are presented.

  4. A hierarchical spatial framework for forest landscape planning.

    Science.gov (United States)

    Pete Bettinger; Marie Lennette; K. Norman Johnson; Thomas A. Spies

    2005-01-01

    A hierarchical spatial framework for large-scale, long-term forest landscape planning is presented along with example policy analyses for a 560,000 ha area of the Oregon Coast Range. The modeling framework suggests utilizing the detail provided by satellite imagery to track forest vegetation condition and for representation of fine-scale features, such as riparian...

  5. Coordinating services embedded everywhere via hierarchical planning

    NARCIS (Netherlands)

    Georgievski, Ilche

    2015-01-01

    The spaces we live in are provided with different devices and technologies, such as sensors for recognising our presence. The aim of such spaces is to improve our comfort, productivity, and even reduce our energy bills. The problem with fulfilling the aim is that devices alone cannot do much to

  6. Hierarchical Motion Planning for Autonomous Aerial and Terrestrial Vehicles

    Science.gov (United States)

    Cowlagi, Raghvendra V.

    Autonomous mobile robots---both aerial and terrestrial vehicles---have gained immense importance due to the broad spectrum of their potential military and civilian applications. One of the indispensable requirements for the autonomy of a mobile vehicle is the vehicle's capability of planning and executing its motion, that is, finding appropriate control inputs for the vehicle such that the resulting vehicle motion satisfies the requirements of the vehicular task. The motion planning and control problem is inherently complex because it involves two disparate sub-problems: (1) satisfaction of the vehicular task requirements, which requires tools from combinatorics and/or formal methods, and (2) design of the vehicle control laws, which requires tools from dynamical systems and control theory. Accordingly, this problem is usually decomposed and solved over two levels of hierarchy. The higher level, called the geometric path planning level, finds a geometric path that satisfies the vehicular task requirements, e.g., obstacle avoidance. The lower level, called the trajectory planning level, involves sufficient smoothening of this geometric path followed by a suitable time parametrization to obtain a reference trajectory for the vehicle. Although simple and efficient, such hierarchical decomposition suffers a serious drawback: the geometric path planner has no information of the kinematical and dynamical constraints of the vehicle. Consequently, the geometric planner may produce paths that the trajectory planner cannot transform into a feasible reference trajectory. Two main ideas appear in the literature to remedy this problem: (a) randomized sampling-based planning, which eliminates the geometric planner altogether by planning in the vehicle state space, and (b) geometric planning supported by feedback control laws. The former class of methods suffer from a lack of optimality of the resultant trajectory, while the latter class of methods makes a restrictive assumption

  7. Otimização do planejamento hierárquico da produção em usinas cooperadas do setor sucroenergético Optimization of the hierarchical production planning of a cooperative society of sugarcane milling companies

    Directory of Open Access Journals (Sweden)

    Rafael Piatti Oiticica de Paiva

    2012-01-01

    Full Text Available Neste trabalho apresenta-se um modelo de otimização para o planejamento agregado da produção em usinas cooperadas do setor sucroenergético. Esta modelagem considera a relação hierárquica existente entre o planejamento anual da cooperativa e o planejamento tático de safra das usinas cooperadas. No nível de decisão da cooperativa, o modelo indica a meta de produção de cada usina e define a política de estocagem e de atendimento da demanda. No nível de decisão de uma usina cooperada, o modelo possibilita definir a quantidade de cana-de-açúcar colhida, a quantidade transportada por prestador de serviço, a seleção dos processos de produção de açúcar, álcool, melaço e energia elétrica. Para resolver os modelos de programação linear e programação inteira mista envolvidos, utilizou-se uma linguagem de modelagem algébrica e um software de última geração de programação matemática. Resultados computacionais obtidos em estudo de caso são apresentados como forma de ilustrar e validar a aplicação.The main concern of this work is related to the presentation of an aggregate production planning model of a cooperative society of sugar and alcohol milling companies. This mathematical model is based on a hierarchical approach between the annual planning problem of the cooperative and the tactical planning horizon of the sugarcane mills. At the cooperative level, the main questions are related to the allocation of production goals to each mill and the management of inventory and dynamic demands. At the milling companies' level, a process selection model aims at helping the decision makers to determine the following: quantity of sugarcane crushed; selection of sugarcane suppliers; selection of sugarcane transport system; and selection of industrial processes used in sugar, alcohol, molasses and energy production. In order to solve the linear and mixed integer mathematical models involved, a modeling language with an

  8. Hierarchical Bayesian spatial models for multispecies conservation planning and monitoring.

    Science.gov (United States)

    Carroll, Carlos; Johnson, Devin S; Dunk, Jeffrey R; Zielinski, William J

    2010-12-01

    Biologists who develop and apply habitat models are often familiar with the statistical challenges posed by their data's spatial structure but are unsure of whether the use of complex spatial models will increase the utility of model results in planning. We compared the relative performance of nonspatial and hierarchical Bayesian spatial models for three vertebrate and invertebrate taxa of conservation concern (Church's sideband snails [Monadenia churchi], red tree voles [Arborimus longicaudus], and Pacific fishers [Martes pennanti pacifica]) that provide examples of a range of distributional extents and dispersal abilities. We used presence-absence data derived from regional monitoring programs to develop models with both landscape and site-level environmental covariates. We used Markov chain Monte Carlo algorithms and a conditional autoregressive or intrinsic conditional autoregressive model framework to fit spatial models. The fit of Bayesian spatial models was between 35 and 55% better than the fit of nonspatial analogue models. Bayesian spatial models outperformed analogous models developed with maximum entropy (Maxent) methods. Although the best spatial and nonspatial models included similar environmental variables, spatial models provided estimates of residual spatial effects that suggested how ecological processes might structure distribution patterns. Spatial models built from presence-absence data improved fit most for localized endemic species with ranges constrained by poorly known biogeographic factors and for widely distributed species suspected to be strongly affected by unmeasured environmental variables or population processes. By treating spatial effects as a variable of interest rather than a nuisance, hierarchical Bayesian spatial models, especially when they are based on a common broad-scale spatial lattice (here the national Forest Inventory and Analysis grid of 24 km(2) hexagons), can increase the relevance of habitat models to multispecies

  9. Decision support in hierarchical planning systems: The case of procurement planning in oil refining industries

    DEFF Research Database (Denmark)

    Kallestrup, Kasper Bislev; Lynge, Lasse Hadberg; Akkerman, Renzo

    2014-01-01

    In this paper, we discuss the development of decision support systems for hierarchically structured planning approaches, such as commercially available advanced planning systems. We develop a framework to show how such a decision support system can be designed with the existing organization in mind...... and from the perspective of the organizational aspects involved. To exemplify and develop our framework, we use a case study of crude oil procurement planning in the refining industry. The results of the case study indicate an improved organizational embedding of the DSS, leading to significant savings...... in terms of planning efforts and procurement costs. In general, our framework aims to support the continuous improvement of advanced planning systems, increasing planning quality in complex supply chain settings....

  10. Hierarchical Artificial Bee Colony Algorithm for RFID Network Planning Optimization

    Directory of Open Access Journals (Sweden)

    Lianbo Ma

    2014-01-01

    Full Text Available This paper presents a novel optimization algorithm, namely, hierarchical artificial bee colony optimization, called HABC, to tackle the radio frequency identification network planning (RNP problem. In the proposed multilevel model, the higher-level species can be aggregated by the subpopulations from lower level. In the bottom level, each subpopulation employing the canonical ABC method searches the part-dimensional optimum in parallel, which can be constructed into a complete solution for the upper level. At the same time, the comprehensive learning method with crossover and mutation operators is applied to enhance the global search ability between species. Experiments are conducted on a set of 10 benchmark optimization problems. The results demonstrate that the proposed HABC obtains remarkable performance on most chosen benchmark functions when compared to several successful swarm intelligence and evolutionary algorithms. Then HABC is used for solving the real-world RNP problem on two instances with different scales. Simulation results show that the proposed algorithm is superior for solving RNP, in terms of optimization accuracy and computation robustness.

  11. Hierarchical artificial bee colony algorithm for RFID network planning optimization.

    Science.gov (United States)

    Ma, Lianbo; Chen, Hanning; Hu, Kunyuan; Zhu, Yunlong

    2014-01-01

    This paper presents a novel optimization algorithm, namely, hierarchical artificial bee colony optimization, called HABC, to tackle the radio frequency identification network planning (RNP) problem. In the proposed multilevel model, the higher-level species can be aggregated by the subpopulations from lower level. In the bottom level, each subpopulation employing the canonical ABC method searches the part-dimensional optimum in parallel, which can be constructed into a complete solution for the upper level. At the same time, the comprehensive learning method with crossover and mutation operators is applied to enhance the global search ability between species. Experiments are conducted on a set of 10 benchmark optimization problems. The results demonstrate that the proposed HABC obtains remarkable performance on most chosen benchmark functions when compared to several successful swarm intelligence and evolutionary algorithms. Then HABC is used for solving the real-world RNP problem on two instances with different scales. Simulation results show that the proposed algorithm is superior for solving RNP, in terms of optimization accuracy and computation robustness.

  12. A hierarchical approach to multi-project planning under uncertainty

    NARCIS (Netherlands)

    Leus, R.; Wullink, Gerhard; Hans, Elias W.; Herroelen, W.

    2004-01-01

    We survey several viewpoints on the management of the planning complexity of multi-project organisations under uncertainty. A positioning framework is proposed to distinguish between different types of project-driven organisations, which is meant to aid project management in the choice between the

  13. A hierarchical approach to multi-project planning under uncertainty

    NARCIS (Netherlands)

    Hans, Elias W.; Herroelen, W.; Wullink, Gerhard; Leus, R.

    2007-01-01

    We survey several viewpoints on the management of the planning complexity of multi-project organisations under uncertainty. Based on these viewpoints we propose a positioning framework to distinguish between different types of project-driven organisations. This framework is meant to aid project

  14. Maslow and Motherboards: Taking a Hierarchical View of Technology Planning.

    Science.gov (United States)

    Johnson, Doug

    2003-01-01

    Presents a planning model for educational uses of technology that is based on Maslow's hierarchy of needs. Topics include established infrastructure; effective administration; extensive resources; enhanced teaching, including creating distance learning opportunities; empowered students, including evaluation methods and information literacy skills;…

  15. Production optimisation in the petrochemical industry by hierarchical multivariate modelling

    Energy Technology Data Exchange (ETDEWEB)

    Andersson, Magnus; Furusjoe, Erik; Jansson, Aasa

    2004-06-01

    This project demonstrates the advantages of applying hierarchical multivariate modelling in the petrochemical industry in order to increase knowledge of the total process. The models indicate possible ways to optimise the process regarding the use of energy and raw material, which is directly linked to the environmental impact of the process. The refinery of Nynaes Refining AB (Goeteborg, Sweden) has acted as a demonstration site in this project. The models developed for the demonstration site resulted in: Detection of an unknown process disturbance and suggestions of possible causes; Indications on how to increase the yield in combination with energy savings; The possibility to predict product quality from on-line process measurements, making the results available at a higher frequency than customary laboratory analysis; Quantification of the gradually lowered efficiency of heat transfer in the furnace and increased fuel consumption as an effect of soot build-up on the furnace coils; Increased knowledge of the relation between production rate and the efficiency of the heat exchangers. This report is one of two reports from the project. It contains a technical discussion of the result with some degree of detail. A shorter and more easily accessible report is also available, see IVL report B1586-A.

  16. Tracking sentence planning and production.

    Science.gov (United States)

    Kemper, Susan; Bontempo, Daniel; McKedy, Whitney; Schmalzried, RaLynn; Tagliaferri, Bruno; Kieweg, Doug

    2011-03-01

    To assess age differences in the costs of language planning and production. A controlled sentence production task was combined with digital pursuit rotor tracking. Participants were asked to track a moving target while formulating a sentence using specified nouns and verbs and to continue to track the moving target while producing their response. The length of the critical noun phrase (NP) as well as the type of verb provided were manipulated. The analysis indicated that sentence planning was more costly than sentence production, and sentence planning costs increased when participants had to incorporate a long NP into their sentence. The long NPs also tended to be shifted to the end of the sentence, whereas short NPs tended to be positioned after the verb. Planning or producing responses with long NPs was especially difficult for older adults, although verb type and NP shift had similar costs for young and older adults. Pursuit rotor tracking during controlled sentence production reveals the effects of aging on sentence planning and production.

  17. An Efficient, Hierarchical Viewpoint Planning Strategy for Terrestrial Laser Scanner Networks

    Science.gov (United States)

    Jia, F.; Lichti, D. D.

    2018-05-01

    Terrestrial laser scanner (TLS) techniques have been widely adopted in a variety of applications. However, unlike in geodesy or photogrammetry, insufficient attention has been paid to the optimal TLS network design. It is valuable to develop a complete design system that can automatically provide an optimal plan, especially for high-accuracy, large-volume scanning networks. To achieve this goal, one should look at the "optimality" of the solution as well as the computational complexity in reaching it. In this paper, a hierarchical TLS viewpoint planning strategy is developed to solve the optimal scanner placement problems. If one targeted object to be scanned is simplified as discretized wall segments, any possible viewpoint can be evaluated by a score table representing its visible segments under certain scanning geometry constraints. Thus, the design goal is to find a minimum number of viewpoints that achieves complete coverage of all wall segments. The efficiency is improved by densifying viewpoints hierarchically, instead of a "brute force" search within the entire workspace. The experiment environments in this paper were simulated from two buildings located on University of Calgary campus. Compared with the "brute force" strategy in terms of the quality of the solutions and the runtime, it is shown that the proposed strategy can provide a scanning network with a compatible quality but with more than a 70 % time saving.

  18. Efficient Actor-Critic Algorithm with Hierarchical Model Learning and Planning

    Science.gov (United States)

    Fu, QiMing

    2016-01-01

    To improve the convergence rate and the sample efficiency, two efficient learning methods AC-HMLP and RAC-HMLP (AC-HMLP with ℓ 2-regularization) are proposed by combining actor-critic algorithm with hierarchical model learning and planning. The hierarchical models consisting of the local and the global models, which are learned at the same time during learning of the value function and the policy, are approximated by local linear regression (LLR) and linear function approximation (LFA), respectively. Both the local model and the global model are applied to generate samples for planning; the former is used only if the state-prediction error does not surpass the threshold at each time step, while the latter is utilized at the end of each episode. The purpose of taking both models is to improve the sample efficiency and accelerate the convergence rate of the whole algorithm through fully utilizing the local and global information. Experimentally, AC-HMLP and RAC-HMLP are compared with three representative algorithms on two Reinforcement Learning (RL) benchmark problems. The results demonstrate that they perform best in terms of convergence rate and sample efficiency. PMID:27795704

  19. A test sheet generating algorithm based on intelligent genetic algorithm and hierarchical planning

    Science.gov (United States)

    Gu, Peipei; Niu, Zhendong; Chen, Xuting; Chen, Wei

    2013-03-01

    In recent years, computer-based testing has become an effective method to evaluate students' overall learning progress so that appropriate guiding strategies can be recommended. Research has been done to develop intelligent test assembling systems which can automatically generate test sheets based on given parameters of test items. A good multisubject test sheet depends on not only the quality of the test items but also the construction of the sheet. Effective and efficient construction of test sheets according to multiple subjects and criteria is a challenging problem. In this paper, a multi-subject test sheet generation problem is formulated and a test sheet generating approach based on intelligent genetic algorithm and hierarchical planning (GAHP) is proposed to tackle this problem. The proposed approach utilizes hierarchical planning to simplify the multi-subject testing problem and adopts genetic algorithm to process the layered criteria, enabling the construction of good test sheets according to multiple test item requirements. Experiments are conducted and the results show that the proposed approach is capable of effectively generating multi-subject test sheets that meet specified requirements and achieve good performance.

  20. PLANNING VESSEL BODY SECTION PRODUCTION

    Directory of Open Access Journals (Sweden)

    A. G. Grivachevsky

    2015-01-01

    Full Text Available A problem of planning production of a vessel body section is considered. The problem is reduced to the classic Johnson’s tree-machine flow-shop scheduling problem. A genetic algorithm and computer experiment to compare efficiency of this algorithm and the algorithm of full enumeration are described.

  1. New Production Reactors Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    1990-12-01

    Part I of this New Production Reactors (NPR) Program Plan: describes the policy basis of the NPR Program; describes the mission and objectives of the NPR Program; identifies the requirements that must be met in order to achieve the mission and objectives; and describes and assesses the technology and siting options that were considered, the Program's preferred strategy, and its rationale. The implementation strategy for the New Production Reactors Program has three functions: Linking the design, construction, operation, and maintenance of facilities to policies requirements, and the process for selecting options. The development of an implementation strategy ensures that activities and procedures are consistent with the rationale and analysis underlying the Program. Organization of the Program. The strategy establishes plans, organizational structure, procedures, a budget, and a schedule for carrying out the Program. By doing so, the strategy ensures the clear assignment of responsibility and accountability. Management and monitoring of the Program. Finally, the strategy provides a basis for monitoring the Program so that technological, cost, and scheduling issues can be addressed when they arise as the Program proceeds. Like the rest of the Program Plan, the Implementation Strategy is a living document and will be periodically revised to reflect both progress made in the Program and adjustments in plans and policies as they are made. 21 figs., 5 tabs.

  2. New Production Reactors Program Plan

    International Nuclear Information System (INIS)

    1990-12-01

    Part I of this New Production Reactors (NPR) Program Plan: describes the policy basis of the NPR Program; describes the mission and objectives of the NPR Program; identifies the requirements that must be met in order to achieve the mission and objectives; and describes and assesses the technology and siting options that were considered, the Program's preferred strategy, and its rationale. The implementation strategy for the New Production Reactors Program has three functions: Linking the design, construction, operation, and maintenance of facilities to policies requirements, and the process for selecting options. The development of an implementation strategy ensures that activities and procedures are consistent with the rationale and analysis underlying the Program. Organization of the Program. The strategy establishes plans, organizational structure, procedures, a budget, and a schedule for carrying out the Program. By doing so, the strategy ensures the clear assignment of responsibility and accountability. Management and monitoring of the Program. Finally, the strategy provides a basis for monitoring the Program so that technological, cost, and scheduling issues can be addressed when they arise as the Program proceeds. Like the rest of the Program Plan, the Implementation Strategy is a living document and will be periodically revised to reflect both progress made in the Program and adjustments in plans and policies as they are made. 21 figs., 5 tabs

  3. Preferences in Data Production Planning

    Science.gov (United States)

    Golden, Keith; Brafman, Ronen; Pang, Wanlin

    2005-01-01

    This paper discusses the data production problem, which consists of transforming a set of (initial) input data into a set of (goal) output data. There are typically many choices among input data and processing algorithms, each leading to significantly different end products. To discriminate among these choices, the planner supports an input language that provides a number of constructs for specifying user preferences over data (and plan) properties. We discuss these preference constructs, how we handle them to guide search, and additional challenges in the area of preference management that this important application domain offers.

  4. Ensemble-based hierarchical multi-objective production optimization of smart wells

    NARCIS (Netherlands)

    Fonseca, R.M.; Leeuwenburgh, O.; Hof, P.M.J. Van den; Jansen, J.D.

    2014-01-01

    In an earlier study, two hierarchical multiobjective methods were suggested to include short-term targets in life-cycle production optimization. However, this earlier study has two limitations: (1) the adjoint formulation is used to obtain gradient information, requiring simulator source code access

  5. Ensemble-based hierarchical multi-objective production optimization of smart wells

    NARCIS (Netherlands)

    Fonseca, R.M.; Leeuwenburgh, O.; Van den Hof, P.M.J.; Jansen, J.D.

    2014-01-01

    In an earlier study two hierarchical multi-objective methods were suggested to include short-term targets in life-cycle production optimization. However this earlier study has two limitations: 1) the adjoint formulation is used to obtain gradient information, requiring simulator source code access

  6. Predicting Longitudinal Change in Language Production and Comprehension in Individuals with Down Syndrome: Hierarchical Linear Modeling.

    Science.gov (United States)

    Chapman, Robin S.; Hesketh, Linda J.; Kistler, Doris J.

    2002-01-01

    Longitudinal change in syntax comprehension and production skill, measured over six years, was modeled in 31 individuals (ages 5-20) with Down syndrome. The best fitting Hierarchical Linear Modeling model of comprehension uses age and visual and auditory short-term memory as predictors of initial status, and age for growth trajectory. (Contains…

  7. Hierarchical Cu2O foam/g-C3N4 photocathode for photoelectrochemical hydrogen production

    Science.gov (United States)

    Ma, Xinzhou; Zhang, Jingtao; Wang, Biao; Li, Qiuguo; Chu, Sheng

    2018-01-01

    Solar photoelectrochemical (PEC) hydrogen production is a promising way for solving energy and environment problems. Earth-abundant Cu2O is a potential light absorber for PEC hydrogen production. In this article, hierarchical porous Cu2O foams are prepared by thermal oxidation of the electrochemically deposited Cu foams. PEC performances of the Cu2O foams are systematically studied and discussed. Benefiting from their higher light harvesting and more efficient charge separation, the Cu2O foams demonstrate significantly enhanced photocurrents and photostability compared to their film counterparts. Moreover, by integrating g-C3N4, hierarchical Cu2O foam/g-C3N4 composites are prepared with further improved photocurrent and photostability, appearing to be potential photocathodes for solar PEC hydrogen production. This study may provide a new and useful insight for the development of Cu2O-based photocathodes for PEC hydrogen production.

  8. A Hierarchical Approach Using Machine Learning Methods in Solar Photovoltaic Energy Production Forecasting

    OpenAIRE

    Zhaoxuan Li; SM Mahbobur Rahman; Rolando Vega; Bing Dong

    2016-01-01

    We evaluate and compare two common methods, artificial neural networks (ANN) and support vector regression (SVR), for predicting energy productions from a solar photovoltaic (PV) system in Florida 15 min, 1 h and 24 h ahead of time. A hierarchical approach is proposed based on the machine learning algorithms tested. The production data used in this work corresponds to 15 min averaged power measurements collected from 2014. The accuracy of the model is determined using computing error statisti...

  9. Hierarchical path planning and control of a small fixed-wing UAV: Theory and experimental validation

    Science.gov (United States)

    Jung, Dongwon

    2007-12-01

    problem is formulated by setting up geometric linear constraints as well as boundary conditions. Subsequently, we construct B-spline path templates by solving a set of distinct optimization problems. For application in UAV motion planning, the path templates are incorporated to replace parts of the entire path by the smooth B-spline paths. Each path segment is stitched together while preserving continuity to obtain a final smooth reference path to be used for path following control. The path following control for a small fixed-wing UAV to track the prescribed smooth reference path is also addressed. Assuming the UAV is equipped with an autopilot for low level control, we adopt a kinematic error model with respect to the moving Serret-Frenet frame attached to a path for tracking controller design. A kinematic path following control law that commands heading rate is presented. Backstepping is applied to derive the roll angle command by taking into account the approximate closed-loop roll dynamics. A parameter adaptation technique is employed to account for the inaccurate time constant of the closed-loop roll dynamics during actual implementation. Finally, we implement the proposed hierarchical path control of a small UAV on the actual hardware platform, which is based on an 1/5 scale R/C model airframe (Decathlon) and the autopilot hardware and software. Based on the hardware-in-the-loop (HIL) simulation environment, the proposed hierarchical path control algorithm has been validated through on-line, real-time implementation on a small micro-controller. By a seamless integration of the control algorithms for path planning, path smoothing, and path following, it has been demonstrated that the UAV equipped with a small autopilot having limited computational resources manages to accomplish the path control objective to reach the goal while avoiding obstacles with minimal human intervention.

  10. Planning product quality: An example - ornamental plants

    Directory of Open Access Journals (Sweden)

    Kovačević Miodrag

    2003-01-01

    Full Text Available The industry of ornamental plants is a subject of quality planning. The quality plan is a document setting out the specific quality practices in ornamental plants production. That plan introduce organizational structure procedures, processes and resources needed to implement quality in life cycle of product chain. For engineers it represents a new tool.

  11. AVLIS production plant waste management plan

    International Nuclear Information System (INIS)

    1984-01-01

    Following the executive summary, this document contains the following: (1) waste management facilities design objectives; (2) AVLIS production plant wastes; (3) waste management design criteria; (4) waste management plan description; and (5) waste management plan implementation. 17 figures, 18 tables

  12. Appendix E - Sample Production Facility Plan

    Science.gov (United States)

    This sample Spill Prevention, Control and Countermeasure (SPCC) Plan in Appendix E is intended to provide examples and illustrations of how a production facility could address a variety of scenarios in its SPCC Plan.

  13. A dynamical model of hierarchical selection and coordination in speech planning.

    Directory of Open Access Journals (Sweden)

    Sam Tilsen

    Full Text Available studies of the control of complex sequential movements have dissociated two aspects of movement planning: control over the sequential selection of movement plans, and control over the precise timing of movement execution. This distinction is particularly relevant in the production of speech: utterances contain sequentially ordered words and syllables, but articulatory movements are often executed in a non-sequential, overlapping manner with precisely coordinated relative timing. This study presents a hybrid dynamical model in which competitive activation controls selection of movement plans and coupled oscillatory systems govern coordination. The model departs from previous approaches by ascribing an important role to competitive selection of articulatory plans within a syllable. Numerical simulations show that the model reproduces a variety of speech production phenomena, such as effects of preparation and utterance composition on reaction time, and asymmetries in patterns of articulatory timing associated with onsets and codas. The model furthermore provides a unified understanding of a diverse group of phonetic and phonological phenomena which have not previously been related.

  14. Dynamic Domains in Data Production Planning

    Science.gov (United States)

    Golden, Keith; Pang, Wanlin

    2005-01-01

    This paper discusses a planner-based approach to automating data production tasks, such as producing fire forecasts from satellite imagery and weather station data. Since the set of available data products is large, dynamic and mostly unknown, planning techniques developed for closed worlds are unsuitable. We discuss a number of techniques we have developed to cope with data production domains, including a novel constraint propagation algorithm based on planning graphs and a constraint-based approach to interleaved planning, sensing and execution.

  15. Sustainable Multi-Product Seafood Production Planning Under Uncertainty

    International Nuclear Information System (INIS)

    Simanjuntak, Ruth; Mawengkang, Herman; Sembiring, Monalisa; Sinaga, Rani; Pakpahan, Endang J

    2013-01-01

    A multi-product fish production planning produces simultaneously multi fish products from several classes of raw resources. The goal in sustainable production planning is to meet customer demand over a fixed time horizon divided into planning periods by optimizing the tradeoff between economic objectives such as production cost, waste processed cost, and customer satisfaction level. The major decisions are production and inventory levels for each product and the number of workforce in each planning period. In this paper we consider the management of small scale traditional business at North Sumatera Province which performs processing fish into several local seafood products. The inherent uncertainty of data (e.g. demand, fish availability), together with the sequential evolution of data over time leads the sustainable production planning problem to a nonlinear mixed-integer stochastic programming model. We use scenario generation based approach and feasible neighborhood search for solving the model.

  16. Efficient propagation of the hierarchical equations of motion using the matrix product state method

    Science.gov (United States)

    Shi, Qiang; Xu, Yang; Yan, Yaming; Xu, Meng

    2018-05-01

    We apply the matrix product state (MPS) method to propagate the hierarchical equations of motion (HEOM). It is shown that the MPS approximation works well in different type of problems, including boson and fermion baths. The MPS method based on the time-dependent variational principle is also found to be applicable to HEOM with over one thousand effective modes. Combining the flexibility of the HEOM in defining the effective modes and the efficiency of the MPS method thus may provide a promising tool in simulating quantum dynamics in condensed phases.

  17. A Hierarchical Approach Using Machine Learning Methods in Solar Photovoltaic Energy Production Forecasting

    Directory of Open Access Journals (Sweden)

    Zhaoxuan Li

    2016-01-01

    Full Text Available We evaluate and compare two common methods, artificial neural networks (ANN and support vector regression (SVR, for predicting energy productions from a solar photovoltaic (PV system in Florida 15 min, 1 h and 24 h ahead of time. A hierarchical approach is proposed based on the machine learning algorithms tested. The production data used in this work corresponds to 15 min averaged power measurements collected from 2014. The accuracy of the model is determined using computing error statistics such as mean bias error (MBE, mean absolute error (MAE, root mean square error (RMSE, relative MBE (rMBE, mean percentage error (MPE and relative RMSE (rRMSE. This work provides findings on how forecasts from individual inverters will improve the total solar power generation forecast of the PV system.

  18. Geostatistics applied in mine production planning

    Energy Technology Data Exchange (ETDEWEB)

    Zerdin, F.; Markic, S.; Subelj, A. [NTF, Ljubljana (Slovenia)

    1998-07-01

    Long-term plan for lignite mine Velenje has been made by using a technical 'parametrisation' method where the basis for periodic, middle-term and short-term plans as well as for scheduling has already been fixed. Plans are presented by grade (heating value in GJ), quantity of ROM coal in tons and quantity of excavated material in cubic metre for each sequence of the seam or whole seam as well as for all working seams in the mines as a whole which correspond to a defined time period. Grade planning aims at achieving uniform product quality to meet contractual obligations. 17 refs., 10 figs.

  19. Graduate Student Project: Operations Management Product Plan

    Science.gov (United States)

    Fish, Lynn

    2007-01-01

    An operations management product project is an effective instructional technique that fills a void in current operations management literature in product planning. More than 94.1% of 286 graduates favored the project as a learning tool, and results demonstrate the significant impact the project had in predicting student performance. The author…

  20. Phonological Advance Planning in Sentence Production

    Science.gov (United States)

    Oppermann, Frank; Jescheniak, Jorg D.; Schriefers, Herbert

    2010-01-01

    Our study addresses the scope of phonological advance planning during sentence production using a novel experimental procedure. The production of German sentences in various syntactic formats (SVO, SOV, and VSO) was cued by presenting pictures of the agents of previously memorized agent-action-patient scenes. To tap the phonological activation of…

  1. AVLIS Production Plant Project Management Plan

    International Nuclear Information System (INIS)

    1984-01-01

    The AVLIS Production Plant is designated as a Major System Acquisition (in accordance with DOE Order 4240.IC) to deploy Atomic Vapor Laser Isotope Separation (AVLIS) technology at the Oak Ridge, Tennessee site, in support of the US Uranium Enrichment Program. The AVLIS Production Plant Project will deploy AVLIS technology by performing the design, construction, and startup of a production plant that will meet capacity production requirements of the Uranium Enrichment Program. The AVLIS Production Plant Project Management Plan has been developed to outline plans, baselines, and control systems to be employed in managing the AVLIS Production Plant Project and to define the roles and responsibilities of project participants. Participants will develop and maintain detailed procedures for implementing the management and control systems in agreement with this plan. This baseline document defines the system that measures work performed and costs incurred. This plan was developed by the AVLIS Production Plant Project staff of Martin Marietta Energy Systems, Inc. and Lawrence Livermore National Laboratory in accordance with applicable DOE directives, orders and notices. 38 figures, 19 tables

  2. Pdvsa plans to hike productive capacity

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports that Venezuela's state oil company plans to jump its productive capacity by 117,000 b/d to 2.92 million b/d this year. Petroleos de Venezuela also projects sizable increases for oil and gas reserves and plans record spending in 1992. Meantime, Pdvsa is sounding a warning again about the Venezuelan government's excessive tax take amid debate within the company about spending priorities

  3. Generalized production planning problem under interval uncertainty

    Directory of Open Access Journals (Sweden)

    Samir A. Abass

    2010-06-01

    Full Text Available Data in many real life engineering and economical problems suffer from inexactness. Herein we assume that we are given some intervals in which the data can simultaneously and independently perturb. We consider the generalized production planning problem with interval data. The interval data are in both of the objective function and constraints. The existing results concerning the qualitative and quantitative analysis of basic notions in parametric production planning problem. These notions are the set of feasible parameters, the solvability set and the stability set of the first kind.

  4. Fiscal planning of private electricity production projects

    International Nuclear Information System (INIS)

    Gauthier, R.

    2002-01-01

    Various fiscal considerations frequently encountered in the context of the planning of private electricity production projects were described. Two major themes were discussed: 1) the different jurisdictional vehicles that can be used during the planning of private electricity production projects and the associated fiscal considerations, and 2) the two main fiscal incentives of the Income Tax Act (Canada) which could impact on the financing and operation costs of such a project, namely the accelerated amortization and the possibility of deducting the costs associated to renewable energies and energy savings in Canada. This was a general presentation that did not go into specific details and did not represent a legal opinion. refs

  5. A Hierarchical structure of key performance indicators for operation management and continuous improvement in production systems.

    Science.gov (United States)

    Kang, Ningxuan; Zhao, Cong; Li, Jingshan; Horst, John A

    2016-01-01

    Key performance indicators (KPIs) are critical for manufacturing operation management and continuous improvement (CI). In modern manufacturing systems, KPIs are defined as a set of metrics to reflect operation performance, such as efficiency, throughput, availability, from productivity, quality and maintenance perspectives. Through continuous monitoring and measurement of KPIs, meaningful quantification and identification of different aspects of operation activities can be obtained, which enable and direct CI efforts. A set of 34 KPIs has been introduced in ISO 22400. However, the KPIs in a manufacturing system are not independent, and they may have intrinsic mutual relationships. The goal of this paper is to introduce a multi-level structure for identification and analysis of KPIs and their intrinsic relationships in production systems. Specifically, through such a hierarchical structure, we define and layer KPIs into levels of basic KPIs, comprehensive KPIs and their supporting metrics, and use it to investigate the relationships and dependencies between KPIs. Such a study can provide a useful tool for manufacturing engineers and managers to measure and utilize KPIs for CI.

  6. A simple approximation of productivity scores of fuzzy production plans

    DEFF Research Database (Denmark)

    Hougaard, Jens Leth

    2005-01-01

    This paper suggests a simple approximation procedure for the assessment of productivity scores with respect to fuzzy production plans. The procedure has a clear economic interpretation and all the necessary calculations can be performed in a spreadsheet making it highly operational...

  7. Detailed Sponge City Planning Based on Hierarchical Fuzzy Decision-Making: A Case Study on Yangchen Lake

    Directory of Open Access Journals (Sweden)

    Junyu Zhang

    2017-11-01

    Full Text Available We proposed a Hierarchical Fuzzy Inference System (HFIS framework to offer better decision supports with fewer user-defined data (uncertainty. The framework consists two parts: a fuzzified Geographic Information System (GIS and a HFIS system. The former provides comprehensive information on the criterion unit and the latter helps in making more robust decisions. The HFIS and the traditional Multi-Criteria Decision Making (MCDM method were applied to a case study and compared. The fuzzified GIS maps maintained a majority of the dominant characteristics of the criterion unit but also revealed some non-significant information according to the surrounding environment. The urban planning map generated by the two methods shares similar strategy choices (6% difference, while the spatial distribution of strategies shares 69.7% in common. The HFIS required fewer subjective decisions than the MCDM (34 user-defined decision rules vs. 141 manual evaluations.

  8. The Effect of Production Planning and Budgeting on Organizational Productivity

    Directory of Open Access Journals (Sweden)

    Patrick Adebisi Olusegun ADEGBUYI

    2010-12-01

    Full Text Available Improved productivity and proper organizational structure are desired by most manufacturing outfits within the highly turbulent business environment of Nigeria. With various contributing factors, scientific basis for decision making that will lead to enhanced policies for organizational operations is stronlgy established. Five statistical hypotheses which are influence of education, government policies, planning and organizational output, and production planning/budgeting and technological advancement, propounded in this work were investigated to establish a valid decision basis on a confidence level assumed to be 0.05. The work finally examined the impact of the hypotheses on productivity.

  9. Enviromental Development Plan: special nuclear materials production

    International Nuclear Information System (INIS)

    1980-07-01

    This Environmental Development Plan includes the process steps and facilities necessary for the production of plutonium and tritium for Government needs and the production of some other radioactive materials that will be used for heat and radiation sources by domestic and international customers. The production reactors and the spent fuel processing plants and their effluents are discussed, but the defense wastes from them are treated in a separate EDP. The scope does not include transportation, decontamination and decommissioning, safeguards and security, or use of the SNM products

  10. Crop succession requirements in agricultural production planning

    NARCIS (Netherlands)

    Klein Haneveld, W.K.; Stegeman, A.

    2005-01-01

    A method is proposed to write crop succession requirements as linear constraints in an LP-based model for agricultural production planning. Crop succession information is given in the form of a set of inadmissible successions of crops. The decision variables represent the areas where a certain

  11. Hierarchical Satellite-based Approach to Global Monitoring of Crop Condition and Food Production

    Science.gov (United States)

    Zheng, Y.; Wu, B.; Gommes, R.; Zhang, M.; Zhang, N.; Zeng, H.; Zou, W.; Yan, N.

    2014-12-01

    The assessment of global food security goes beyond the mere estimate of crop production: It needs to take into account the spatial and temporal patterns of food availability, as well as physical and economic access. Accurate and timely information is essential to both food producers and consumers. Taking advantage of multiple new remote sensing data sources, especially from Chinese satellites, such as FY-2/3A, HJ-1 CCD, CropWatch has expanded the scope of its international analyses through the development of new indicators and an upgraded operational methodology. The new monitoring approach adopts a hierarchical system covering four spatial levels of detail: global (sixty-five Monitoring and Reporting Units, MRU), seven major production zones (MPZ), thirty-one key countries (including China) and "sub- countries." The thirty-one countries encompass more that 80% of both global exports and production of four major crops (maize, rice, soybean and wheat). The methodology resorts to climatic and remote sensing indicators at different scales, using the integrated information to assess global, regional, and national (as well as sub-national) crop environmental condition, crop condition, drought, production, and agricultural trends. The climatic indicators for rainfall, temperature, photosynthetically active radiation (PAR) as well as potential biomass are first analysed at global scale to describe overall crop growing conditions. At MPZ scale, the key indicators pay more attention to crops and include Vegetation health index (VHI), Vegetation condition index (VCI), Cropped arable land fraction (CALF) as well as Cropping intensity (CI). Together, they characterise agricultural patterns, farming intensity and stress. CropWatch carries out detailed crop condition analyses for thirty one individual countries at the national scale with a comprehensive array of variables and indicators. The Normalized difference vegetation index (NDVI), cropped areas and crop condition are

  12. Study on the correlation between the hierarchical urban system and high-speed railway network planning in China

    Directory of Open Access Journals (Sweden)

    Hong Sun

    2016-09-01

    Full Text Available This study examines the interrelatedness between the hierarchical structure of China׳s urban system and high-speed railway (HSR network planning at the national level. As a multi-layered system, the Chinese HSR can be categorized into three sub-networks, namely, the national HSR trunk network, the national HSR extensional network, and the intercity HSR network. By examining the direct HSR network connection, HSR nodal connection, and HSR operational frequency of 287 prefecture-level cities, this study demonstrates that the hierarchies of China׳s administrative, demographic, and economic urban systems strongly influence HSR network planning. The national HSR trunk network prioritizes the connection of top-level central cities, whereas the extensional network prioritizes cities at the lower level of the urban system. Moreover, the national HSR system forms the backbone of the HSR network structure based on a national scale, whereas the intercity HSR system satisfies the travel needs within urban agglomerations based on the regional level.

  13. Productivity Research and Development Planning Workshop.

    Science.gov (United States)

    1986-03-01

    mission. These ideas must come from everyone in all echelons of the Comand. The MAC quality of worklife efforts consist of quality circles, labor-manage...that would not have been captured by the measure as initially formulated by the PIG. The balance of the plan and recommenda- tions made by the PMWG...people are doing things. We have the suggestion program, the quality of worklife program, and the Tech Mod program. All of these programs are productivity

  14. Production, staff, working time and financial planning

    Directory of Open Access Journals (Sweden)

    Orlando Boiteux

    2009-07-01

    Full Text Available Aggregate planning can be a tool for coordinating the tactical decisions belonging to some functional areas of a company. This potential has been limited due to methodological and technical reasons, but nowadays it is possible to solve very sophisticated models integrating, with a high level of detail, a great number of decisions of several functional areas and that permit to include new management schemes. In this paper, a production, staff, working time and cash management model is introduced.

  15. Global hierarchical classification of deepwater and wetland environments from remote sensing products

    Science.gov (United States)

    Fluet-Chouinard, E.; Lehner, B.; Aires, F.; Prigent, C.; McIntyre, P. B.

    2017-12-01

    Global surface water maps have improved in spatial and temporal resolutions through various remote sensing methods: open water extents with compiled Landsat archives and inundation with topographically downscaled multi-sensor retrievals. These time-series capture variations through time of open water and inundation without discriminating between hydrographic features (e.g. lakes, reservoirs, river channels and wetland types) as other databases have done as static representation. Available data sources present the opportunity to generate a comprehensive map and typology of aquatic environments (deepwater and wetlands) that improves on earlier digitized inventories and maps. The challenge of classifying surface waters globally is to distinguishing wetland types with meaningful characteristics or proxies (hydrology, water chemistry, soils, vegetation) while accommodating limitations of remote sensing data. We present a new wetland classification scheme designed for global application and produce a map of aquatic ecosystem types globally using state-of-the-art remote sensing products. Our classification scheme combines open water extent and expands it with downscaled multi-sensor inundation data to capture the maximal vegetated wetland extent. The hierarchical structure of the classification is modified from the Cowardin Systems (1979) developed for the USA. The first level classification is based on a combination of landscape positions and water source (e.g. lacustrine, riverine, palustrine, coastal and artificial) while the second level represents the hydrologic regime (e.g. perennial, seasonal, intermittent and waterlogged). Class-specific descriptors can further detail the wetland types with soils and vegetation cover. Our globally consistent nomenclature and top-down mapping allows for direct comparison across biogeographic regions, to upscale biogeochemical fluxes as well as other landscape level functions.

  16. [School meals: planning, production, distribution, and adequacy].

    Science.gov (United States)

    Issa, Raquel Carvalho; Moraes, Letícia Freitas; Francisco, Raquel Rocha Jabour; dos Santos, Luana Caroline; dos Anjos, Adriana Fernandez Versiani; Pereira, Simone Cardoso Lisboa

    2014-02-01

    To evaluate the planning, production, distribution, and nutritional adequacy of meals served at city schools. This descriptive cross-sectional study was conducted between March 2011 and April 2012 and included a representative sample (n = 42 schools) of extended shift city schools from Belo Horizonte, Minas Gerais, Brazil. Five meals from each school were randomly selected and analyzed by direct weighing. Production indicators and nutritional adequacy were evaluated in contrast to the recommendations of the city food security bureau and the Brazilian National Program of School Meals (PNAE). Seventy-nine percent of the analyzed meals did not meet the recommendations of the city food security bureau. The rate of waste (food left on plates) was acceptable at 4,90%, but the rates of cooked and not served food (7,06%) and counter leftovers (5,30%) were high. Both the city planned meals and the meals served in the schools were nutritionally inadequate in terms of the PNAE, particularly for children aged 11-15 years. There was a relationship between consumption by school staff and the amount of food that was cooked (r = 0.353; P planning, production, and distribution of school meals and of food and nutrition education in order to improve the quality of food and to reduce waste in schools.

  17. Coordinated supply chain dynamic production planning model

    Science.gov (United States)

    Chandra, Charu; Grabis, Janis

    2001-10-01

    Coordination of different and often contradicting interests of individual supply chain members is one of the important issues in supply chain management because the individual members can not succeed without success of the supply chain and vice versa. This paper investigates a supply chain dynamic production planning problem with emphasis on coordination. A planning problem is formally described using a supply chain kernel, which defines supply chain configuration, management policies, available resources and objectives both at supply chain or macro and supply chain member or micro levels. The coordinated model is solved in order to balance decisions made at the macro and micro levels and members' profitability is used as the coordination criterion. The coordinated model is used to determine inventory levels and production capacity across the supply chain. Application of the coordinated model distributes costs burden uniformly among supply chain members and preserves overall efficiency of the supply chain. Influence of the demand series uncertainty is investigated. The production planning model is a part of the integrated supply chain decision modeling system, which is shared among the supply chain members across the Internet.

  18. A deterministic aggregate production planning model considering quality of products

    International Nuclear Information System (INIS)

    Madadi, Najmeh; Wong, Kuan Yew

    2013-01-01

    Aggregate Production Planning (APP) is a medium-term planning which is concerned with the lowest-cost method of production planning to meet customers' requirements and to satisfy fluctuating demand over a planning time horizon. APP problem has been studied widely since it was introduced and formulated in 1950s. However, in several conducted studies in the APP area, most of the researchers have concentrated on some common objectives such as minimization of cost, fluctuation in the number of workers, and inventory level. Specifically, maintaining quality at the desirable level as an objective while minimizing cost has not been considered in previous studies. In this study, an attempt has been made to develop a multi-objective mixed integer linear programming model that serves those companies aiming to incur the minimum level of operational cost while maintaining quality at an acceptable level. In order to obtain the solution to the multi-objective model, the Fuzzy Goal Programming approach and max-min operator of Bellman-Zadeh were applied to the model. At the final step, IBM ILOG CPLEX Optimization Studio software was used to obtain the experimental results based on the data collected from an automotive parts manufacturing company. The results show that incorporating quality in the model imposes some costs, however a trade-off should be done between the cost resulting from producing products with higher quality and the cost that the firm may incur due to customer dissatisfaction and sale losses.

  19. Feed Materials Production Center Waste Management Plan

    International Nuclear Information System (INIS)

    Watts, R.E.; Allen, T.; Castle, S.A.; Hopper, J.P.; Oelrich, R.L.

    1986-01-01

    In the process of producing uranium metal products used in Department of Energy (DOE) defense programs at other DOE facilities, various types of wastes are generated at the Feed Materials Production Center (FMPC). Process wastes, both generated and stored, are discussed in the Waste Management Plan and include low-level radioactive waste (LLW), mixed hazardous/radioactive waste, and sanitary/industrial waste. Scrap metal waste and wastes requiring special remediation are also addressed in the Plan. The Waste Management Plan identifies the comprehensive programs developed to address safe storage and disposition of all wastes from past, present, and future operations at the FMPC. Waste streams discussed in this Plan are representative of the waste generated and waste types that concern worker and public health and safety. Budgets and schedules for implementation of waste disposition are also addressed. The waste streams receiving the largest amount of funding include LLW approved for shipment by DOE/ORO to the Nevada Test Site (NTS) (MgF 2 , slag leach filter cake, and neutralized raffinate); remedial action wastes (waste pits, K-65 silo waste); thorium; scrap metal (contaminated and noncontaminated ferrous and copper scrap); construction rubble and soil generated from decontamination and decommissioning of outdated facilities; and low-level wastes that will be handled through the Low-Level Waste Processing and Shipping System (LLWPSS). Waste Management milestones are also provided. The Waste Management Plan is divided into eight major sections: Introduction; Site Waste and Waste Generating Process; Strategy; Projects and Operations; Waste Stream Budgets; Milestones; Quality Assurance for Waste Management; and Environmental Monitoring Program

  20. Word Order and Voice Influence the Timing of Verb Planning in German Sentence Production

    Directory of Open Access Journals (Sweden)

    Sebastian Sauppe

    2017-09-01

    Full Text Available Theories of incremental sentence production make different assumptions about when speakers encode information about described events and when verbs are selected, accordingly. An eye tracking experiment on German testing the predictions from linear and hierarchical incrementality about the timing of event encoding and verb planning is reported. In the experiment, participants described depictions of two-participant events with sentences that differed in voice and word order. Verb-medial active sentences and actives and passives with sentence-final verbs were compared. Linear incrementality predicts that sentences with verbs placed early differ from verb-final sentences because verbs are assumed to only be planned shortly before they are articulated. By contrast, hierarchical incrementality assumes that speakers start planning with relational encoding of the event. A weak version of hierarchical incrementality assumes that only the action is encoded at the outset of formulation and selection of lexical verbs only occurs shortly before they are articulated, leading to the prediction of different fixation patterns for verb-medial and verb-final sentences. A strong version of hierarchical incrementality predicts no differences between verb-medial and verb-final sentences because it assumes that verbs are always lexically selected early in the formulation process. Based on growth curve analyses of fixations to agent and patient characters in the described pictures, and the influence of character humanness and the lack of an influence of the visual salience of characters on speakers' choice of active or passive voice, the current results suggest that while verb planning does not necessarily occur early during formulation, speakers of German always create an event representation early.

  1. Word Order and Voice Influence the Timing of Verb Planning in German Sentence Production.

    Science.gov (United States)

    Sauppe, Sebastian

    2017-01-01

    Theories of incremental sentence production make different assumptions about when speakers encode information about described events and when verbs are selected, accordingly. An eye tracking experiment on German testing the predictions from linear and hierarchical incrementality about the timing of event encoding and verb planning is reported. In the experiment, participants described depictions of two-participant events with sentences that differed in voice and word order. Verb-medial active sentences and actives and passives with sentence-final verbs were compared. Linear incrementality predicts that sentences with verbs placed early differ from verb-final sentences because verbs are assumed to only be planned shortly before they are articulated. By contrast, hierarchical incrementality assumes that speakers start planning with relational encoding of the event. A weak version of hierarchical incrementality assumes that only the action is encoded at the outset of formulation and selection of lexical verbs only occurs shortly before they are articulated, leading to the prediction of different fixation patterns for verb-medial and verb-final sentences. A strong version of hierarchical incrementality predicts no differences between verb-medial and verb-final sentences because it assumes that verbs are always lexically selected early in the formulation process. Based on growth curve analyses of fixations to agent and patient characters in the described pictures, and the influence of character humanness and the lack of an influence of the visual salience of characters on speakers' choice of active or passive voice, the current results suggest that while verb planning does not necessarily occur early during formulation, speakers of German always create an event representation early.

  2. Production planning and scheduling in refinery industry

    International Nuclear Information System (INIS)

    Persson, Jan.

    1999-01-01

    In this thesis we consider production planning and scheduling in refinery industry, in particular we study the planning and scheduling at the Nynaes AB refinery and at the Scanraff AB refinery. The purpose is to contribute to the development and the use of optimization models to support efficient decision making. We identify various decision problems concerning the aggregated production planning, the shipment planning, the scheduling of operation modes, and the utilization of pipes and tanks; and we discuss the potential to successfully apply optimization models on these problems. We formulate a mixed integer linear programming model for the scheduling of operation modes at Nynaes. The model concerns decisions about which mode of operation to use at a particular point in time in order to minimize costs of changing modes and costs of keeping inventories, given demands for products. We derive several types of valid inequalities for this mathematical problem and show how these inequalities can improve the lower bound obtained from the linear programming relaxation of the problem. We also show how the valid inequalities can be used to improve the performance of a branch and bound solution approach. Further, a tabu search heuristic is developed for the scheduling problem. The solution methods are tested on data provided by the Nynaes refinery, and the performance of the methods are discussed. We present several extensions of the proposed model, and illustrate how the model can be used to support both operational and strategic decision making at the refinery. 66 refs, 6 figs, 32 tabs. Also published as: Dissertation from the International Graduate School of Management and Industrial Engineering, No 25, Licenciate Thesis

  3. Production planning and scheduling in refinery industry

    Energy Technology Data Exchange (ETDEWEB)

    Persson, Jan

    1999-07-01

    In this thesis we consider production planning and scheduling in refinery industry, in particular we study the planning and scheduling at the Nynaes AB refinery and at the Scanraff AB refinery. The purpose is to contribute to the development and the use of optimization models to support efficient decision making. We identify various decision problems concerning the aggregated production planning, the shipment planning, the scheduling of operation modes, and the utilization of pipes and tanks; and we discuss the potential to successfully apply optimization models on these problems. We formulate a mixed integer linear programming model for the scheduling of operation modes at Nynaes. The model concerns decisions about which mode of operation to use at a particular point in time in order to minimize costs of changing modes and costs of keeping inventories, given demands for products. We derive several types of valid inequalities for this mathematical problem and show how these inequalities can improve the lower bound obtained from the linear programming relaxation of the problem. We also show how the valid inequalities can be used to improve the performance of a branch and bound solution approach. Further, a tabu search heuristic is developed for the scheduling problem. The solution methods are tested on data provided by the Nynaes refinery, and the performance of the methods are discussed. We present several extensions of the proposed model, and illustrate how the model can be used to support both operational and strategic decision making at the refinery. 66 refs, 6 figs, 32 tabs. Also published as: Dissertation from the International Graduate School of Management and Industrial Engineering, No 25, Licenciate Thesis.

  4. Production planning and scheduling in refinery industry

    Energy Technology Data Exchange (ETDEWEB)

    Persson, Jan

    1999-06-01

    In this thesis we consider production planning and scheduling in refinery industry, in particular we study the planning and scheduling at the Nynaes AB refinery and at the Scanraff AB refinery. The purpose is to contribute to the development and the use of optimization models to support efficient decision making. We identify various decision problems concerning the aggregated production planning, the shipment planning, the scheduling of operation modes, and the utilization of pipes and tanks; and we discuss the potential to successfully apply optimization models on these problems. We formulate a mixed integer linear programming model for the scheduling of operation modes at Nynaes. The model concerns decisions about which mode of operation to use at a particular point in time in order to minimize costs of changing modes and costs of keeping inventories, given demands for products. We derive several types of valid inequalities for this mathematical problem and show how these inequalities can improve the lower bound obtained from the linear programming relaxation of the problem. We also show how the valid inequalities can be used to improve the performance of a branch and bound solution approach. Further, a tabu search heuristic is developed for the scheduling problem. The solution methods are tested on data provided by the Nynaes refinery, and the performance of the methods are discussed. We present several extensions of the proposed model, and illustrate how the model can be used to support both operational and strategic decision making at the refinery. 66 refs, 6 figs, 32 tabs. Also published as: Dissertation from the International Graduate School of Management and Industrial Engineering, No 25, Licenciate Thesis

  5. New Production Reactor project-management plan

    International Nuclear Information System (INIS)

    McCrosson, F.J.; Hibbard, L.; Buckner, M.R.

    1982-01-01

    This document provides a project management plan for the first phase of a project to design and build a new production reactor (NPR) at SRP. The design of the NPR is based upon proven SRP heavy water reactor design, with several enhancements such as full containment, moderator detritiation, improved cooling, and modernized control rooms and instrumentation. The first phase of the NPR project includes environmental and safety analyses, preparation of the technical data summary and basic data, site studies, engineering studies, and conceptual design. The project management plan was developed by a 14-member task force comprised of representatives from the Technical Division, the Manufacturing Division, the Departmental Engineer's Office, and the Engineering Department

  6. An Interactive Simulation Tool for Production Planning in Bacon Factories

    DEFF Research Database (Denmark)

    Nielsen, Jens Frederik Dalsgaard; Nielsen, Kirsten Mølgaard

    1994-01-01

    The paper describes an interactive simulation tool for production planning in bacon factories. The main aim of the tool is to make it possible to combine the production plans of all parts of the factory......The paper describes an interactive simulation tool for production planning in bacon factories. The main aim of the tool is to make it possible to combine the production plans of all parts of the factory...

  7. Working memory and planning during sentence production.

    Science.gov (United States)

    Martin, Randi C; Yan, Hao; Schnur, Tatiana T

    2014-10-01

    Speakers retrieve conceptual, syntactic and lexical information in advance of articulation during sentence production. What type of working memory (WM) store is used to hold the planned information before speaking? To address this question, we measured onset latencies when subjects produced sentences that began with either a complex or a simple initial noun phrase, while holding semantic, phonological or spatial information in WM. Although we found that subjects had longer onset latencies for sentences beginning with a complex noun phrase, showing a phrasal scope of planning, the magnitude of this complexity effect was not affected by any type of WM load. However, subjects made more syntactic errors (but not lexical errors) for sentences beginning with a complex noun phrase, suggesting that advance planning for these phrases occurs at a syntactic rather than lexical-semantic level, which may account for the lack of effect with various types of WM load in the current study. Copyright © 2014 Elsevier B.V. All rights reserved.

  8. A review of planning models for maintenance and production.

    NARCIS (Netherlands)

    G. Budai-Balke (Gabriella); R. Dekker (Rommert); R.P. Nicolai (Robin)

    2006-01-01

    textabstractIn this article we give an overview of the relation between planning of maintenance and production. On the one hand we consider production planning and scheduling models in which failures and maintenance aspects are taken into account. Next we discuss the planning of maintenance

  9. Direct Z-scheme TiO2/CdS hierarchical photocatalyst for enhanced photocatalytic H2-production activity

    Science.gov (United States)

    Meng, Aiyun; Zhu, Bicheng; Zhong, Bo; Zhang, Liuyang; Cheng, Bei

    2017-11-01

    Photocatalytic H2 evolution, which utilizes solar energy via water splitting, is a promising route to deal with concerns about energy and environment. Herein, a direct Z-scheme TiO2/CdS binary hierarchical photocatalyst was fabricated via a successive ionic layer adsorption and reaction (SILAR) technique, and photocatalytic H2 production was measured afterwards. The as-prepared TiO2/CdS hybrid photocatalyst exhibited noticeably promoted photocatalytic H2-production activity of 51.4 μmol h-1. The enhancement of photocatalytic activity was ascribed to the hierarchical structure, as well as the efficient charge separation and migration from TiO2 nanosheets to CdS nanoparticles (NPs) at their tight contact interfaces. Moreover, the direct Z-scheme photocatalytic reaction mechanism was demonstrated to elucidate the improved photocatalytic performance of TiO2/CdS composite photocatalyst. The photoluminescence (PL) analysis of hydroxyl radicals were conducted to provide clues for the direct Z-scheme mechanism. This work provides a facile route for the construction of redox mediator-free Z-scheme photocatalytic system for photocatalytic water splitting.

  10. Facile preparation of hierarchically porous carbon using diatomite as both template and catalyst and methylene blue adsorption of carbon products.

    Science.gov (United States)

    Liu, Dong; Yuan, Peng; Tan, Daoyong; Liu, Hongmei; Wang, Tong; Fan, Mingde; Zhu, Jianxi; He, Hongping

    2012-12-15

    Hierarchically porous carbons were prepared using a facile preparation method in which diatomite was utilized as both template and catalyst. The porous structures of the carbon products and their formation mechanisms were investigated. The macroporosity and microporosity of the diatomite-templated carbons were derived from replication of diatom shell and structure-reconfiguration of the carbon film, respectively. The macroporosity of carbons was strongly dependent on the original morphology of the diatomite template. The macroporous structure composed of carbon plates connected by the pillar- and tube-like macropores resulted from the replication of the central and edge pores of the diatom shells with disk-shaped morphology, respectively. And another macroporous carbon tubes were also replicated from canoe-shaped diatom shells. The acidity of diatomite dramatically affected the porosity of the carbons, more acid sites of diatomite template resulted in higher surface area and pore volume of the carbon products. The diatomite-templated carbons exhibited higher adsorption capacity for methylene blue than the commercial activated carbon (CAC), although the specific surface area was much smaller than that of CAC, due to the hierarchical porosity of diatomite-templated carbons. And the carbons were readily reclaimed and regenerated. Copyright © 2012 Elsevier Inc. All rights reserved.

  11. National contingency plan product schedule data base

    International Nuclear Information System (INIS)

    Putukian, J.; Hiltabrand, R.R.

    1993-01-01

    During oil spills there are always proposals by the technical community and industry to use chemical agents to help in oil spill cleanups. Federal Clean Water Act regulations require that any chemical agents that the federal on-scene coordinator (FOSC) wants to use for oil cleanup be listed on the US Environmental Protection Agency (EPA) National Contingency Plan (NCP) Product Schedule. Chemical countermeasures are among the most controversial, complex, and time-critical issues facing decision-making officials choosing response methods to use on coastal oil spills. There are situations in which dispersants are likely to be one of the most appropriate counter-measure strategies. Dispersants are most effective when applied to fresh oil, and their effectiveness dramatically decreases as the oil weathers, which can begin in as little as 24 hours. To logistically implement dispersant use, a decision would need to be made within roughly the first 4 hours after the release. Most of the information that the FOSC needs to make the determination to use a specific chemical agent exists in manuals, EPA bulletins, and the published literature. This information is not in an easy-to-use format under field emergency conditions. Hence the need to collect and disseminate the information in an automated data base. The sources for the information in this data base are the following. Published results of tests performed by Environment Canada; EPA bulletins associated with the NCP Product Schedule; Published results of tests by the chemical industry. The data base resides on a Macintosh computer and contains information about 70 NCP products, including dispersants, surface collecting agents, and biological additives. It contains information on physical properties, toxicity, heavy metal content, safety precautions, use conditions, etc

  12. Hierarchical Honeycomb Br-, N-Codoped TiO2 with Enhanced Visible-Light Photocatalytic H2 Production.

    Science.gov (United States)

    Zhang, Chao; Zhou, Yuming; Bao, Jiehua; Sheng, Xiaoli; Fang, Jiasheng; Zhao, Shuo; Zhang, Yiwei; Chen, Wenxia

    2018-06-06

    The halogen elements modification strategy of TiO 2 encounters a bottleneck in visible-light H 2 production. Herein, we have for the first time reported a hierarchical honeycomb Br-, N-codoped anatase TiO 2 catalyst (HM-Br,N/TiO 2 ) with enhanced visible-light photocatalytic H 2 production. During the synthesizing process, large amounts of meso-macroporous channels and TiO 2 nanosheets were fabricated in massive TiO 2 automatically, constructing the hierarchical honeycomb structure with large specific surface area (464 m 2 g -1 ). cetyl trimethylammonium bromide and melamine played a key role in constructing the meso-macroporous channels. Additionally, HM-Br,N/TiO 2 showed a high visible-light H 2 production rate of 2247 μmol h -1 g -1 , which is far more higher than single Br- or N-doped TiO 2 (0 or 63 μmol h -1 g -1 , respectively), thereby demonstrating the excellent synergistic effects of Br and N elements in H 2 evolution. In HM-Br,N/TiO 2 catalytic system, the codoped Br-N atoms could reduce the band gap of TiO 2 to 2.88 eV and the holes on acceptor levels (N acceptor) can passivate the electrons on donor levels (Br donor), thereby preventing charge carriers recombination significantly. Furthermore, the proposed HM-Br,N/TiO 2 fabrication strategy had a wide range of choices for N source (e.g., melamine, urea, and dicyandiamide) and it can be applied to other TiO 2 materials (e.g., P25) as well, thereby implying its great potential application in visible-light H 2 production. Finally, on the basis of experimental results, a possible photocatalytic H 2 production mechanism for HM-Br,N/TiO 2 was proposed.

  13. Virtual Factory Framework for Supporting Production Planning and Control.

    Science.gov (United States)

    Kibira, Deogratias; Shao, Guodong

    2017-01-01

    Developing optimal production plans for smart manufacturing systems is challenging because shop floor events change dynamically. A virtual factory incorporating engineering tools, simulation, and optimization generates and communicates performance data to guide wise decision making for different control levels. This paper describes such a platform specifically for production planning. We also discuss verification and validation of the constituent models. A case study of a machine shop is used to demonstrate data generation for production planning in a virtual factory.

  14. A Hierarchical Framework of New Product Development: An Example from Biotechnology

    NARCIS (Netherlands)

    Furrer, O.F.G.; Alexandre, M.T.; Sudharshan, D.

    2003-01-01

    Many new products are based on new technologies, which may in turn be based on new scientific discoveries. The extant literature on new product development has focused on how a firm may successfully commercialize new products. There is a corporate cost associated with new product failure, which

  15. Production planning in the Combinado Lácteo Santiago

    Directory of Open Access Journals (Sweden)

    Edith Carmen Fajardo-Alcolea

    2017-12-01

    Full Text Available A planning, programming and control of the production procedure is designed in this paper to consider all the technical and organizational aspects that are involved in planning, using the balance and normative method, and a variant of the General Algorithm for the Calculation of the Capacities. This procedure is supported by an innovative computer application designed to assist students, technicians and specialists in the planning stages. The procedure is applied in the company “Combinado Lácteo de Santiago de Cuba” to plan the production in 2016. As a result, an innovation of an organizational type is obtained that allows the Production Master Plan, disaggregated in the different time horizons, consider the real capacity of the plants. For its evaluation it was compared to the production plan prepared by the company and the actual production data of the first quarter of the year to determine the existing differences.

  16. Product Family Modelling for Manufacturing Planning

    DEFF Research Database (Denmark)

    Jørgensen, Kaj Asbjørn; Petersen, Thomas Ditlev; Nielsen, Kjeld

    2011-01-01

    To enable product configuration of a product family, it is important to develop a model of the selected product family. From such a model, an often performed practice is to make a product configurator from which customers can specify individual products from the family. To get further utilisation...

  17. IMPROVEMENT OF PRODUCTION PLANNING IN COMPANY PARS KOMPONENTY

    Directory of Open Access Journals (Sweden)

    René Klega

    2014-03-01

    Full Text Available The article analyzes the current status of production planning in company Pars Komponenty s.r.o., proposes a new method of planning based on application of the principle of MRP. It is a discrete type of production with high complexity of BOM and MTO (Make-to-Order and ETO (Engineering-to-Order from the point of decoupling point. The original planning system plans according to production capacity backward without collisions, but for a given type of production does not work in practice. Planning system was analyzed and the main problems were identified, which were high work in progress and material stocks. This article target is to propose a new planining system based on the inclusion of time reserves of purchased material items. New planning system was tested in practise with benefit in reducing both the material inventory and work in progress.

  18. Production Planning with Load Dependent Lead Times

    DEFF Research Database (Denmark)

    Pahl, Julia

    2005-01-01

    Lead times impact the performance of the supply chain significantly. Although there is a large literature concerning queuing models for the analysis of the relationship between capacity utilization and lead times, and there is a substantial literature concerning control and order release policies...... that take lead times into consideration, there have been only few papers describing models at the aggregate planning level that recognize the relationship between the planned utilization of capacity and lead times. In this paper we provide an in-depth discussion of the state-of-the art in this literature......, with particular attention to those models that are appropriate at the aggregate planning level....

  19. Forest management planning for timber production: a sequential approach

    Science.gov (United States)

    Krishna P. Rustagi

    1978-01-01

    Explicit forest management planning for timber production beyond the first few years at any time necessitates use of information which can best be described as suspect. The two-step approach outlined here concentrates on the planning strategy over the next few years without losing sight of the long-run productivity. Frequent updating of the long-range and short-range...

  20. Productivity and Performance through Marketing Planning

    Directory of Open Access Journals (Sweden)

    Cristian Morozan

    2008-11-01

    Full Text Available In the marketing area, planning might be defined as an anticipation process of those changes that affect the market and as an elaboration process of the corresponding action means. It will result in a marketing plan, which might be tactical (short-term period, spread on a period of time that might vary from six months to one year, or a strategic (long-term, spread on a period of time of three to ten years. Planning means building action programs in which the objectives, the set financing method or the steps of achieving it should be clearly defined. Marketing planning also proves to be important for its liaison between what the company can offer and the consumers’ needs and expectations.

  1. Production Planning and Planting Pattern Scheduling Information System for Horticulture

    Science.gov (United States)

    Vitadiar, Tanhella Zein; Farikhin; Surarso, Bayu

    2018-02-01

    This paper present the production of planning and planting pattern scheduling faced by horticulture farmer using two methods. Fuzzy time series method use to predict demand on based on sales amount, while linear programming is used to assist horticulture farmers in making production planning decisions and determining the schedule of cropping patterns in accordance with demand predictions of the fuzzy time series method, variable use in this paper is size of areas, production advantage, amount of seeds and age of the plants. This research result production planning and planting patterns scheduling information system with the output is recommendations planting schedule, harvest schedule and the number of seeds will be plant.

  2. Automobile Marketing Strategies, Pricing, and Product Planning

    Science.gov (United States)

    1978-04-01

    The objective of the study was to determine the decision-making processes concerning major model year product introductions and alterations in the automotive industry as well as to investigate techniques of price positioning, product and image positi...

  3. Automobile Marketing Strategies, Pricing, and Product Planning

    Science.gov (United States)

    1978-01-01

    The objective of the study was to determine the decision-making processes concerning major model year product introductions and alterations in the automotive industry as well as to investigate techniques of price positioning, product and image positi...

  4. Freezing the Master Production Schedule Under Rolling Planning Horizons

    OpenAIRE

    V. Sridharan; William L. Berry; V. Udayabhanu

    1987-01-01

    The stability of the Master Production Schedule (MPS) is a critical issue in managing production operations with a Material Requirements Planning System. One method of achieving stability is to freeze some portion or all of the MPS. While freezing the MPS can limit the number of schedule changes, it can also produce an increase in production and inventory costs. This paper examines three decision variables in freezing the MPS: the freezing method, the freeze interval length, and the planning ...

  5. Innovation Cycles Concerning Strategic Planning of Product-Service-Systems

    OpenAIRE

    Hepperle, Clemens;Mörtl, Markus;Lindemann, Udo

    2017-01-01

    This paper proposes a research program for identifying, understanding and describing innovation cycles concerning strategic planning of product-service-systems. A general overview about the background of cycle management in innovation processes, which the proposed research program is part of, is given before focusing cycles concerning strategic planning. As companies offer more and more complex products in order to satisfy market needs, the innovation process of such products becomes also mor...

  6. INTEGRATED METHODOLOGY FOR PRODUCT PLANNING USING MULTI CRITERIA ANALYSIS

    Directory of Open Access Journals (Sweden)

    Tarun Soota

    2016-09-01

    Full Text Available Integrated approach to multi-criteria decision problems is proposed using quality function deployment and analytical network process. The objective of the work is to rationalize and improve the method of analyzing and interpreting customer needs and technical requirements. The methodology is used to determine, prioritize engineering requirements based on customer needs for development of best product. Framework allows decision maker to decompose a complex problem in a hierarchical structure to show relationship between objective and criteria. Multi-criteria decision modeling is used for extending the hierarchy process to both dependence and feedback. A case study on bikes is presented for the proposed model.

  7. A model for marketing planning for new products

    DEFF Research Database (Denmark)

    Martensen, Anne

    1993-01-01

    awareness model. The model can be used to generate improved marketing plans. In this connection, it is important that the model includes the marketing variables, for it is only in this way that the model can be used for marketing plan optimization. It is predicted that a future direction of development...... and use of sales forecasting models for new products will be within optimization of the marketing plan for launching a new product, and not only as a tool for forecasting sales for just one marketing plan....

  8. Exploring the cognitive and affective bases of online purchase intentions : a hierarchical test across product types

    NARCIS (Netherlands)

    Verhagen, Tibert; Bloemers, Daniel

    2017-01-01

    Whereas there is ample e-commerce research on how online store beliefs and consumer online affective states may influence online purchase intentions, no research so far has examined whether the hierarchy of effects between these concepts differs across product types. In this study, we fill this

  9. Planning stability in a product recorvery syste

    NARCIS (Netherlands)

    G. Heisig; M. Fleischmann (Moritz)

    2001-01-01

    textabstractRecovery of used products is an issue of growing importance due to customer expectations and environmental regulation. As a consequence, companies need to adapt their material management taking into account inbound flows of used products. Corresponding inventory control models have been

  10. Robust Optimization Model for Production Planning Problem under Uncertainty

    Directory of Open Access Journals (Sweden)

    Pembe GÜÇLÜ

    2017-01-01

    Full Text Available Conditions of businesses change very quickly. To take into account the uncertainty engendered by changes has become almost a rule while planning. Robust optimization techniques that are methods of handling uncertainty ensure to produce less sensitive results to changing conditions. Production planning, is to decide from which product, when and how much will be produced, with a most basic definition. Modeling and solution of the Production planning problems changes depending on structure of the production processes, parameters and variables. In this paper, it is aimed to generate and apply scenario based robust optimization model for capacitated two-stage multi-product production planning problem under parameter and demand uncertainty. With this purpose, production planning problem of a textile company that operate in İzmir has been modeled and solved, then deterministic scenarios’ and robust method’s results have been compared. Robust method has provided a production plan that has higher cost but, will result close to feasible and optimal for most of the different scenarios in the future.

  11. Production optimisation in the petrochemical industry by hierarchical multivariate modelling. Phase 2: On-line implementation

    Energy Technology Data Exchange (ETDEWEB)

    Nilsson, Aasa; Persson, Fredrik; Andersson, Magnus

    2009-07-15

    IVL, together with Emerson Process Management, has developed a decision support system (DSS) based on multivariate statistical process models. The system was implemented at Nynas AB's refinery in order to provide real-time TBP curves and to enable the operator to optimise the process with regards to product quality and energy consumption. The project resulted in the following proven benefits at the industrial reference site, Nynas Refinery in Gothenburg: - Increased yield with up to 14 % (relative terms) for the most valuable product - Decreased energy consumption of 8 %. Validation of model predictions compared to the laboratory analysis showed that the prediction error lay within 1 deg C throughout the whole test period

  12. Effects of parallel planning on agreement production.

    Science.gov (United States)

    Veenstra, Alma; Meyer, Antje S; Acheson, Daniel J

    2015-11-01

    An important issue in current psycholinguistics is how the time course of utterance planning affects the generation of grammatical structures. The current study investigated the influence of parallel activation of the components of complex noun phrases on the generation of subject-verb agreement. Specifically, the lexical interference account (Gillespie & Pearlmutter, 2011b; Solomon & Pearlmutter, 2004) predicts more agreement errors (i.e., attraction) for subject phrases in which the head and local noun mismatch in number (e.g., the apple next to the pears) when nouns are planned in parallel than when they are planned in sequence. We used a speeded picture description task that yielded sentences such as the apple next to the pears is red. The objects mentioned in the noun phrase were either semantically related or unrelated. To induce agreement errors, pictures sometimes mismatched in number. In order to manipulate the likelihood of parallel processing of the objects and to test the hypothesized relationship between parallel processing and the rate of agreement errors, the pictures were either placed close together or far apart. Analyses of the participants' eye movements and speech onset latencies indicated slower processing of the first object and stronger interference from the related (compared to the unrelated) second object in the close than in the far condition. Analyses of the agreement errors yielded an attraction effect, with more errors in mismatching than in matching conditions. However, the magnitude of the attraction effect did not differ across the close and far conditions. Thus, spatial proximity encouraged parallel processing of the pictures, which led to interference of the associated conceptual and/or lexical representation, but, contrary to the prediction, it did not lead to more attraction errors. Copyright © 2015 Elsevier B.V. All rights reserved.

  13. A continuous-time control model on production planning network ...

    African Journals Online (AJOL)

    A continuous-time control model on production planning network. DEA Omorogbe, MIU Okunsebor. Abstract. In this paper, we give a slightly detailed review of Graves and Hollywood model on constant inventory tactical planning model for a job shop. The limitations of this model are pointed out and a continuous time ...

  14. Preliminar plan of a machine for the synchrotron radiation production

    International Nuclear Information System (INIS)

    Moscati, G.; Takahashi, J.; Miyao, Y.

    1985-01-01

    A preliminar plan, with all the technical specifications, for the construction of a machine for the synchrotron radiation production to be done by the National Synchrotron Radiation Laboratory in Brazil is presented. (L.C.) [pt

  15. Application of PIMS Software in Monthly Planning of Refinery Production

    Institute of Scientific and Technical Information of China (English)

    2005-01-01

    This article describes the application of the PIMS software in formulating monthly refining production plan. Application of the PIMS software can help to solve a series of problems related with monthly plan of refining production such as optimized selection of crude and feedstocks, optimized selection of production scale and processing scheme, identification of bottlenecks and their mitigation,optimized selection of turnaround time and optimized selection of operating regime, which have increased the economic benefits of refining enterprises. With the further development and improvement of models the PIMS software will play an increasingly important role in formulating monthly plans of refining operations and production management at refineries. This article also explores the problems existing in refinery monthly planning, and has made recommendations on developing and improving models and reporting system, enhancement of basic data acquisition, model maintenance personnel and staff training.

  16. Integrated production planning and water management in the food industry: A cheese production case study

    NARCIS (Netherlands)

    Pulluru, Sai Jishna; Akkerman, Renzo; Hottenrott, Andreas

    2017-01-01

    Efficient water management is increasingly relevant in the food industry. Exploiting water reuse opportunities in planning production activities is a key part of this. We study integrated water management and production planning in cheese production. For this, we develop a water-integrated lot

  17. Multi-product dynamic advertisement planning in a segmented market

    Directory of Open Access Journals (Sweden)

    Aggarwal Sugandha

    2017-01-01

    Full Text Available In this paper, a dynamic multi-objective linear integer programming model is proposed to optimally distribute a firm’s advertising budget among multiple products and media in a segmented market. To make the media plan responsive to the changes in the market, the distribution is carried out dynamically by dividing the planning horizon into smaller periods. The model incorporates the effect of the previous period advertising reach on the current period (taken through retention factor, and it also considers cross-product effect of simultaneously advertising different products. An application of the model is presented for an insurance firm that markets five different products, using goal programming approach.

  18. Interface between the production plan and the master production schedule in assembly environments

    OpenAIRE

    Moya Navarro, Marcos; Sánchez Brenes, Magaly

    2012-01-01

    In a production environment there is a direct relationship between the market and the manufacturing process of goods.When production is immersed in an assembly environment, the process of production planning and scheduling becomes complex, and the enterprises have the risk of losing competitive advantages in terms of not meeting delivery dates and production high costs. Linear programming has become an appropriate tool for production planning and scheduling in complex manufacturing environmen...

  19. Medium range production planning of "Tacer" company: a case study

    OpenAIRE

    Süer, Burak

    1994-01-01

    Ankara : Department of Management and the Graduate School of Business Administration of Bilkent University, 1994. Thesis (Master's) -- Bilkent University, 1994 Includes bibliographical references. In order to foresee the potential problems related with production, a production plan is undertaken for the year 1994. Product classification is determined according to the annual sales volume of the company "Tacer". A production schedule is prepared in relation with the forecast d...

  20. Fabrication of TiO{sub 2} hierarchical architecture assembled by nanowires with anatase/TiO{sub 2}(B) phase-junctions for efficient photocatalytic hydrogen production

    Energy Technology Data Exchange (ETDEWEB)

    Qiu, Yong; Ouyang, Feng, E-mail: ouyangfh@hit.edu.cn

    2017-05-01

    Highlights: • H-titanate nanowires hierarchical architectures (TNH) were prepared by a hydrothermal method. • Calcinations of TNH leads to the formation of anatase/TiO{sub 2}(B) phase-junctions. • The hierarchical architecture offered enhanced light harvesting and large specific surface area. • The 1D nanowires and anatase/TiO{sub 2}(B) phase-junctions both can enhance the separation of photoinduced electron-hole. • The products calcined at the optimum conditions (450 °C) exhibited a maximum hydrogenproduction rate of 7808 μmol g{sup −1} h{sup −1}. - Abstract: TiO{sub 2} hierarchical architecture assembled by nanowires with anatase/TiO{sub 2}(B) phase-junctions was prepared by a hydrothermal process followed by calcinations. The optimum calcination treatment (450 °C) not only led to the formation of anatase/TiO{sub 2}(B) phase-junctions, but also kept the morphology of 1D nanowire and hierarchical architecture well. The T-450 load 0.5 wt% Pt cocatalysts showed the best photocatalytic hydrogen production activity, with a maximum hydrogen production rate of 7808 μmol g{sup −1} h{sup −1}. The high photocatalytic activity is ascribed to the combined effects of the following three factors: (1) the hierarchical architecture exhibits better light harvesting; (2) the larger specific surface area provides more surface active sites for the photocatalytic reaction; (3) the 1D nanowires and anatase/TiO{sub 2}(B) phase-junctions both can enhance the separation of photoinduced electron-hole pairs and inhibit their recombination.

  1. Maintenance planning for a deteriorating production process

    International Nuclear Information System (INIS)

    Ahmadi, Reza; Fouladirad, Mitra

    2017-01-01

    We consider a system subject to degradation, more precisely a production process with three quality states evolving according to a homogeneous Markov process. The degradation decreases the income generated by the system. To maintain revenue stream and prevent the loss of revenue, the system is inspected according to a Markov-modulated Poisson process. It is assumed that each inspection at time t incurs a time dependent cost. Each inspection improves the system health and therefore the degradation level jumps to a less deteriorated state. In absence of inspections, the system state is prone to shift to a more deteriorated state with a constant rate. The problem is to determine an optimal operating (stopping) time which truly balances some flow of income and increasing costs due to inspections, and so maximizes the expected gain of the proposed policy. To demonstrate the applicability of the explored approach and its effectiveness, some numerical results are provided. - Highlights: • An integrated model based on a quality state-dependent reward structure is explored. • The model allows the revenue stream responds to variation in the quality state. • The production process is inspected according to a Markovmodulated Poisson process. • Assuming a Markovian structure, we predict the quality state behavior. • We determine an optimal production run length based on a stopping decision rule.

  2. Energy-Performance as a driver for optimal production planning

    International Nuclear Information System (INIS)

    Salahi, Niloofar; Jafari, Mohsen A.

    2016-01-01

    Highlights: • A 2-dimensional Energy-Performance measure is proposed for energy aware production. • This is a novel approach integrates energy efficiency with production requirements. • This approach simultaneously incorporates machine and process related specifications. • The problem is solved as stochastic MILP with constraints addressing risk averseness. • The optimization is illustrated for 2 cases of single and serial machining operation. • Impact of various electricity pricing schemes on proposed production plan is analyzed. - Abstract: In this paper, we present energy-aware production planning using a two-dimensional “Energy-Performance” measure. With this measure, the production plan explicitly takes into account machine-level requirements, process control strategies, product types and demand patterns. The “Energy-Performance” measure is developed based on an existing concept, namely, “Specific Energy” at machine level. It is further expanded to an “Energy-Performance” profile for a production line. A production planning problem is formulated as a stochastic MILP with risk-averse constraints to account for manufacturer’s risk averseness. The objective is to attain an optimal production plan that minimizes the total loss distribution subject to system throughput targets, probabilistic risk constraints and constraints imposed by the underlying “Energy-Performance” pattern. Electricity price and demand per unit time are assumed to be stochastic. Conditional Value at Risk (CVaR) of loss distributions is used as the manufacturer’s risk measure. Both single-machine and production lines are studied for different profiles and electricity pricing schemes. It is shown that the shape of “Energy-Performance” profile can change optimal plans.

  3. Production planning of a perishable product with lead time and non-stationary demand

    NARCIS (Netherlands)

    Pauls-Worm, K.G.J.; Haijema, R.; Hendrix, E.M.T.; Rossi, R.; Vorst, van der J.G.A.J.

    2012-01-01

    We study a production planning problem for a perishable product with a fixed lifetime, under a service-level constraint. The product has a non-stationary stochastic demand. Food supply chains of fresh products like cheese and several crop products, are characterised by long lead times due to

  4. Towards an integration of process planning and production planning and control for flexible manufacturing systems

    NARCIS (Netherlands)

    Gaalman, GJC; Slomp, J; Suresh, NC

    This introduction article attempts to present some major issues relating to the integration of process planning and production planning and control (PPC) for flexible manufacturing systems (FMSs). It shows that the performance of an FMS can be significantly improved and FMS capabilities more

  5. Production planning and coronal stop deletion in spontaneous speech

    Directory of Open Access Journals (Sweden)

    James Tanner

    2017-06-01

    Full Text Available Many phonological processes can be affected by segmental context spanning word boundaries, which often lead to variable outcomes. This paper tests the idea that some of this variability can be explained by reference to production planning. We examine coronal stop deletion (CSD, a variable process conditioned by preceding and upcoming phonological context, in a corpus of spontaneous British English speech, as a means of investigating a number of variables associated with planning: Prosodic boundary strength, word frequency, conditional probability of the following word, and speech rate. From the perspective of production planning, (1 prosodic boundaries should affect deletion rate independently of following context; (2 given the locality of production planning, the effect of the following context should decrease at stronger prosodic boundaries; and (3 other factors affecting planning scope should modulate the effect of upcoming phonological material above and beyond the modulating effect of prosodic boundaries. We build a statistical model of CSD realization, using pause length as a quantitative proxy for boundary strength, and find support for these predictions. These findings are compatible with the hypothesis that the locality of production planning constrains variability in speech production, and have practical implications for work on CSD and other variable processes.

  6. Planning organization and productivity simulation tool for maritime container terminals

    Directory of Open Access Journals (Sweden)

    B. Beškovnik

    2010-09-01

    Full Text Available The article describes a proposed planning organization and productivity simulation tool, with a special emphasis on orientations to the optimization of operations in a maritime container terminal. With the application of an adequate model frame for traffic and technical-technologic forecasting, infrastructure and manpower planning and productivity simulation are possible to measure and increase the productivity in the whole subsystem of the maritime container terminal. The emphasis is mainly put on setting up planning organization in order to collect important information and consequently to raise productivity. This is the main task and goal of terminal management that must develop elements and strategies for optimal operational and financial production. An adequate planning structure must use simplified but efficient simulation tools enabling owners and management to take a vast number of adequate financial and operational decisions. Considering all important and very dynamic facts in container and shipping industry, the proposed simulation tool gives a helpful instrument for checking productivity and its time variation and monitoring a competitive position of a certain maritime terminal with the terminals from the same group. Therefore, the management of every maritime container terminal must establish an appropriate internal planning system as a mechanism for strategic decision support relating basically to the assessment of the best development and optimization solutions for the infrastructure and suprastructure of the entire system.

  7. Application of mathematical planning in production of filled emulsion rubbers

    Science.gov (United States)

    Pugacheva, I. N.; Molokanova, L. V.; Popova, L. V.; Repin, P. S.

    2018-05-01

    The applicability of mathematical planning of experiment in the field of chemistry and chemical engineering, in particular in the industrial production of synthetic rubbers, is considered in the article. Possibility of using secondary material resources, which are waste products of light industry, in the production of elastomeric compositions is studied. The method of obtaining a powdered cellulose additive from wastes containing cellulose fiber is described. The best way of introducing the obtained additive into elastomeric compositions based on the emulsion rubber is established. Optimal conditions for obtaining filled emulsion rubber with the help of a powdered cellulose additive were established basing on the mathematical planning of experiment.

  8. Short-term hydropower production planning by stochastic programming

    DEFF Research Database (Denmark)

    Fleten, Stein-Erik; Kristoffersen, Trine

    2008-01-01

    -term production planning a matter of spatial distribution among the reservoirs of the plant. Day-ahead market prices and reservoir inflows are, however, uncertain beyond the current operation day and water must be allocated among the reservoirs in order to strike a balance between current profits and expected......Within the framework of multi-stage mixed-integer linear stochastic programming we develop a short-term production plan for a price-taking hydropower plant operating under uncertainty. Current production must comply with the day-ahead commitments of the previous day which makes short...

  9. Polymorphic Uncertain Linear Programming for Generalized Production Planning Problems

    Directory of Open Access Journals (Sweden)

    Xinbo Zhang

    2014-01-01

    Full Text Available A polymorphic uncertain linear programming (PULP model is constructed to formulate a class of generalized production planning problems. In accordance with the practical environment, some factors such as the consumption of raw material, the limitation of resource and the demand of product are incorporated into the model as parameters of interval and fuzzy subsets, respectively. Based on the theory of fuzzy interval program and the modified possibility degree for the order of interval numbers, a deterministic equivalent formulation for this model is derived such that a robust solution for the uncertain optimization problem is obtained. Case study indicates that the constructed model and the proposed solution are useful to search for an optimal production plan for the polymorphic uncertain generalized production planning problems.

  10. Product Chain Action Plan tomato production in Kenya and Tanzania

    NARCIS (Netherlands)

    Visser, de C.L.M.

    2007-01-01

    With the importance of the field vegetable sector for Africa in mind and the constraints attached to that sector, the AfriVeg project (“Development of commercial field vegetable production, distribution and marketing for the East African market”) was developed by Wageningen UR to contribute to

  11. To plan or not to plan: Does planning for production remove facilitation from associative priming?

    Science.gov (United States)

    Jongman, Suzanne R; Meyer, Antje S

    2017-11-01

    Theories of conversation propose that in order to have smooth transitions from one turn to the next, speakers already plan their response while listening to their interlocutor. Moreover, it has been argued that speakers align their linguistic representations (i.e. prime each other), thereby reducing the processing costs associated with concurrent listening and speaking. In two experiments, we assessed how identity and associative priming from spoken words onto picture naming were affected by a concurrent speech planning task. In a baseline (no name) condition, participants heard prime words that were identical, associatively related, or unrelated to target pictures presented two seconds after prime onset. Each prime was accompanied by a non-target picture and followed by its recorded name. The participant did not name the non-target picture. In the plan condition, the participants first named the non-target picture, instead of listening to the recording, and then the target. In Experiment 1, where the plan- and no-plan conditions were tested between participants, priming effects of equal strength were found in the plan and no-plan condition. In Experiment 2, where the two conditions were tested within participants, the identity priming effect was maintained, but the associative priming effect was only seen in the no-plan but not in the plan condition. In this experiment, participant had to decide at the onset of each trial whether or not to name the non-target picture, rendering the task more complex than in Experiment 1. These decision processes may have interfered with the processing of the primes. Thus, associative priming can take place during speech planning, but only if the cognitive load is not too high. Copyright © 2017 Elsevier B.V. All rights reserved.

  12. A Hierarchical Multiple-Level Approach to the Assessment of Interpersonal Relatedness and Self-Definition: Implications for Research, Clinical Practice, and DSM Planning.

    Science.gov (United States)

    Luyten, Patrick; Blatt, Sidney J

    2016-01-01

    Extant research suggests there is considerable overlap between so-called 2-polarities models of personality development; that is, models that propose that personality development evolves through a dialectic synergistic interaction between 2 key developmental tasks across the life span-the development of self-definition on the one hand and of relatedness on the other. These models have attracted considerable research attention and play a central role in DSM planning. This article provides a researcher- and clinician-friendly guide to the assessment of these personality theories. We argue that current theoretical models focus on issues of relatedness and self-definition at different hierarchically organized levels of analysis; that is (a) at the level of broad personality features, (b) at the motivational level (i.e., the motivational processes underlying the development of these dimensions), and (c) at the level of underlying internal working models or cognitive affective schemas, and the specific interpersonal features and problems in which they are expressed. Implications for further research and DSM planning are outlined.

  13. Structuring front-end innovation activities throughout strategic product planning

    Directory of Open Access Journals (Sweden)

    Thaisa Rodrigues

    Full Text Available Abstract Strategic product planning (SPP for new product development (NPD in the front-end of innovation (FEI is a great challenge for managers and practitioners. This article analyzes the structuring process of FEI activities during SPP. A research was carried out with 78 industries from both food and furniture in Brazil. Our study revealed that FEI activities are structured in an intricate network with a high level of complexity and interdependence. The large amount of activities and the complexity in structuring them denote that companies are concerned to reduce uncertainties and risks intensifying the planning phase.

  14. Improving productivity levels: family planning services for factory workers.

    Science.gov (United States)

    Darmokusumo, H V

    1989-10-01

    In May 1984, the Minister of Manpower in Indonesia, the Chairman of the BKKBN, and representatives of the employers' and workers' organizations of Indonesia issued a joint decree pledging that they would work together to enhance the implementation of the family planning program among workers in the organized sector. 1 objective of the decree is to improve workers' productivity and the standard of living of workers and their families by implementing a family planning program. 1 baseline survey and a clinic-based survey in 5 provinces revealed that 90% of women workers are between 21-40, or are of reproductive age, and are sexually active. Only about 50% are practicing family planning; the other 50% are afraid to practice family planning due to potential side effects of various methods. This fear was most often caused by negative rumors spread by unsatisfied family planning clients. Placing materials for family planning promotion such as instructional posters and video programs advertising contraceptive services in the work setting may increase knowledge and help alleviate some of this fear. Other studies of family planning services show that employees prefer female medical doctors or midwives as service providers, employees are willing to pay for services (but can only afford a small fee), and family planning service points should be near employees' work sites.

  15. Production planning and control of less emitting production systems

    Energy Technology Data Exchange (ETDEWEB)

    Haasis, H.D. [Bremen Univ. (Germany)

    1995-12-31

    The concept of integral environmental protection has been growing in importance within Western Europe in recent years. Increasingly, it has come to be recognized that no one part of the environment is separate from any other, it functions as a whole. Yet, pollution control was until recently, usually based on an approach which considers emissions to air, water, and land separately. That has begun to change, particularly since the 1987 report by the World Commission on Environment and Development. This can be recognized, for example, within the proposal for a Directive of the Council of the European Union on Integrated Pollution Prevention and Control. By this, the environmental media are placed on an equal legislative footing so that the final result will be that the way in which an installation is operated will be better for the whole environment. In other words, less emission production systems are obtained. Realization of an integral concept or of less emission production systems initially requires technical measures for the avoidance and the minimization of emissions, as well as recovery and recycling of materials and substances

  16. Production planning and control of less emitting production systems

    Energy Technology Data Exchange (ETDEWEB)

    Haasis, H D [Bremen Univ. (Germany)

    1996-12-31

    The concept of integral environmental protection has been growing in importance within Western Europe in recent years. Increasingly, it has come to be recognized that no one part of the environment is separate from any other, it functions as a whole. Yet, pollution control was until recently, usually based on an approach which considers emissions to air, water, and land separately. That has begun to change, particularly since the 1987 report by the World Commission on Environment and Development. This can be recognized, for example, within the proposal for a Directive of the Council of the European Union on Integrated Pollution Prevention and Control. By this, the environmental media are placed on an equal legislative footing so that the final result will be that the way in which an installation is operated will be better for the whole environment. In other words, less emission production systems are obtained. Realization of an integral concept or of less emission production systems initially requires technical measures for the avoidance and the minimization of emissions, as well as recovery and recycling of materials and substances

  17. Applying linear programming model to aggregate production planning of coated peanut products

    Science.gov (United States)

    Rohmah, W. G.; Purwaningsih, I.; Santoso, EF S. M.

    2018-03-01

    The aim of this study was to set the overall production level for each grade of coated peanut product to meet market demands with a minimum production cost. The linear programming model was applied in this study. The proposed model was used to minimize the total production cost based on the limited demand of coated peanuts. The demand values applied to the method was previously forecasted using time series method and production capacity aimed to plan the aggregate production for the next 6 month period. The results indicated that the production planning using the proposed model has resulted a better fitted pattern to the customer demands compared to that of the company policy. The production capacity of product family A, B, and C was relatively stable for the first 3 months of the planning periods, then began to fluctuate over the next 3 months. While, the production capacity of product family D and E was fluctuated over the 6-month planning periods, with the values in the range of 10,864 - 32,580 kg and 255 – 5,069 kg, respectively. The total production cost for all products was 27.06% lower than the production cost calculated using the company’s policy-based method.

  18. Multi-Objective Fuzzy Linear Programming In Agricultural Production Planning

    Directory of Open Access Journals (Sweden)

    H.M.I.U. Herath

    2015-08-01

    Full Text Available Abstract Modern agriculture is characterized by a series of conflicting optimization criteria that obstruct the decision-making process in the planning of agricultural production. Such criteria are usually net profit total cost total production etc. At the same time the decision making process in the agricultural production planning is often conducted with data that accidentally occur in nature or that are fuzzy not deterministic. Such data are the yields of various crops the prices of products and raw materials demand for the product the available quantities of production factors such as water labor etc. In this paper a fuzzy multi-criteria mathematical programming model is presented. This model is applied in a region of 10 districts in Sri Lanka where paddy is cultivated under irrigated and rain fed water in the two main seasons called Yala and Maha and the optimal production plan is achieved. This study was undertaken to find out the optimal allocation of land for paddy to get a better yield while satisfying the two conflicting objectives profit maximizing and cost minimizing subjected to the utilizing of water constraint and the demand constraint. Only the availability of land constraint is considered as a crisp in nature while objectives and other constraints are treated as fuzzy. It is observed that the MOFLP is an effective method to handle more than a single objective occurs in an uncertain vague environment.

  19. Phonological Planning during Sentence Production: Beyond the Verb.

    Science.gov (United States)

    Schnur, Tatiana T

    2011-01-01

    The current study addresses the extent of phonological planning during spontaneous sentence production. Previous work shows that at articulation, phonological encoding occurs for entire phrases, but encoding beyond the initial phrase may be due to the syntactic relevance of the verb in planning the utterance. I conducted three experiments to investigate whether phonological planning crosses multiple grammatical phrase boundaries (as defined by the number of lexical heads of phrase) within a single phonological phrase. Using the picture-word interference paradigm, I found in two separate experiments a significant phonological facilitation effect to both the verb and noun of sentences like "He opens the gate." I also altered the frequency of the direct object and found longer utterance initiation times for sentences ending with a low-frequency vs. high-frequency object offering further support that the direct object was phonologically encoded at the time of utterance initiation. That phonological information for post-verbal elements was activated suggests that the grammatical importance of the verb does not restrict the extent of phonological planning. These results suggest that the phonological phrase is unit of planning, where all elements within a phonological phrase are encoded before articulation. Thus, consistent with other action sequencing behavior, there is significant phonological planning ahead in sentence production.

  20. Marketing a managed care plan: achieving product differentiation.

    Science.gov (United States)

    Romeo, N C

    1996-01-01

    The health care marketplace is changing dramatically, even without federal reform measures. This is a volatile, yet promising, time to market a managed care plan. Before marketing the product, it is critical that the competition is thoroughly evaluated and consumer and employer needs are researched. The final product should be distinguishable from the competition and address market needs. Promotion can then begin, utilizing a proactive public relations and advertising campaign in addition to traditional methods of marketing.

  1. White Rose development plan amendment production volume increase

    International Nuclear Information System (INIS)

    2006-09-01

    In January 2001, Husky Oil Operations Limited (Husky), in joint-venture with Petro-Canada, submitted a Benefits Plan for the White Rose Development to the Canada- Newfoundland and Labrador Offshore Petroleum Board (C-NLOPB). This revised document provided the case for requesting an increase in the facility maximum daily production rate and the average annual production rate for the White Rose field from 100,000 barrels per day (bpd) as stated in the approved White Rose Development Plan to 140,000 bpd. In order to determine the potential for increasing oil production through the Floating Production, Storage and Offloading (FPSO) vessel, two things were considered, namely the proper reservoir management of the White Rose field to ensure optimum resource recovery, and the capacity of the FPSO topsides processing system and supporting utilities to accommodate increased production. This document presented a detailed review of all the implications of increased production on the South White Rose Reservoir. In addition, the results from FPSO performance testing were reviewed, including a study of options for de-bottlenecking the process plant on the topsides and capacity testing of selected process streams and support systems. Vibration analysis was conducted before and during performance testing in July 2006 and a small number of areas addressed. The document also addressed flow metering, resource management, certifying authority review, safety plan revisions, environmental effects, as well as benefits to Canada and Newfoundland. 21 tabs., 60 refs

  2. Leadership and productivity in planning organizations: a case study.

    Science.gov (United States)

    Whitcomb, G R; Williams, E G

    1978-01-01

    This paper presents the findings of a case study dealing mainly with the effects of two divergent leadership styles on the productivity of a planning organization. Changes in various kinds of participation in the agency's activities--an important side effect--are also linked to the two leadership patterns. The agency studied, a private health and welfare council in a medium-sized American city, varied considerably in its output of planning activities and decision making depending on whether it had a participative or a directive leader. The results indicated that there was a trade-off between such highly revered social values as leadership and the extent of participation by staff, board members, and local agency administrators. Implications focus on ways to achieve diversity in communication style among managers and the role of productivity measures in determining the overall effectiveness of planning agencies.

  3. Automating the production planning of a 3D printing factory

    NARCIS (Netherlands)

    Adan, I.J.B.F.; Pogromskiy, A.Y.; Freens, J.P.N.; Ploegmakers, H.; Yilmaz, L.; Chan, W.K.V.; Moon, I.; Roeder, T.M.K.; Macal, C.; Rossetti, M.D.

    2015-01-01

    To increase a 3D printer's throughput and decrease the print objects' lead times, composing good batches for 3D printers in high-volume 3D printing environments is of great importance. Since manual planners cannot oversee the whole production planning, they tend to make sub-optimal decisions. This

  4. A Fuzzy Linear Programming Approach for Aggregate Production Planning

    DEFF Research Database (Denmark)

    Iris, Cagatay; Cevikcan, Emre

    2014-01-01

    a mathematical programming framework for aggregate production planning problem under imprecise data environment. After providing background information about APP problem, together with fuzzy linear programming, the fuzzy linear programming model of APP is solved on an illustrative example for different a...

  5. Planning at the Phonological Level during Sentence Production

    Science.gov (United States)

    Schnur, Tatiana T.; Costa, Albert; Caramazza, Alfonso

    2006-01-01

    In two picture-word interference experiments we examined whether phrase boundaries affected how far in advance speakers plan the sounds of words during sentence production. Participants produced sentences of varying lengths (short determiner + noun + verb or long determiner + adjective + noun + verb) while ignoring phonologically related and…

  6. To plan or not to plan: Does planning for production remove facilitation from associative priming?

    NARCIS (Netherlands)

    Jongman, S.R.; Meyer, A.S.

    2017-01-01

    Theories of conversation propose that in order to have smooth transitions from one turn to the next, speakers already plan their response while listening to their interlocutor. Moreover, it has been argued that speakers align their linguistic representations (i.e. prime each other), thereby reducing

  7. How hierarchical is language use?

    Science.gov (United States)

    Frank, Stefan L.; Bod, Rens; Christiansen, Morten H.

    2012-01-01

    It is generally assumed that hierarchical phrase structure plays a central role in human language. However, considerations of simplicity and evolutionary continuity suggest that hierarchical structure should not be invoked too hastily. Indeed, recent neurophysiological, behavioural and computational studies show that sequential sentence structure has considerable explanatory power and that hierarchical processing is often not involved. In this paper, we review evidence from the recent literature supporting the hypothesis that sequential structure may be fundamental to the comprehension, production and acquisition of human language. Moreover, we provide a preliminary sketch outlining a non-hierarchical model of language use and discuss its implications and testable predictions. If linguistic phenomena can be explained by sequential rather than hierarchical structure, this will have considerable impact in a wide range of fields, such as linguistics, ethology, cognitive neuroscience, psychology and computer science. PMID:22977157

  8. Soedra's ecological forest management plans. Effects on production and economy

    International Nuclear Information System (INIS)

    Viklund, E.

    1998-01-01

    In 1995 SOEDRA Skog, Sweden's largest forest owners association, started making ecological forest management plans, Groena skogsbruksplaner. The ecological forest management plans are divided into different compartments in which the management is adapted to the present ecological conditions. The stands are divided into four different categories depending on the different values of nature conservation. The object of this study was to find an easy method to quantify and describe the effects of nature conservation on economy and forest production in SOEDRA:s ecological forest management plans. The developed and purposed method, called PLAN-metoden, does not consider the interests, measures beyond the period of the plan, or losses due to snow or wind. It calculates the difference between the purposed measures in the ecological management plan and an alternative with management according to the requirements of the present Forestry Act. The economic effects of nature conservation varies between a net profit of 0,3% and a cost of 9,1% when calculated with the cash-flow method. The average decrease of possible cutting of merchantable timber was 11,3% and varies between 3,1 and 32,9%. The average decrease of cutting possibilities was 12,9% and varies between a decrease of 0,7% and a decrease of 28,3% when calculated with a present value method. Mainly mature, well-stocked compartments, which are considered not to be managed in the future, give rise to high costs. Properties with unprofitable thinnings and costly scarification, regeneration and cleaning seem to be favoured by the nature conservation in the plans. The Ecological management plans are expected to be of great importance to the members of SOEDRA. The interest in nature conservation is larger than that of economical issues. In order to avoid unsatisfactory results the planning should be accomplished in close personal contact with the forest owner Examination paper 1998-1. 21 refs, 2 figs, 39 tabs

  9. Home-based radiology transcription and a productivity pay plan.

    Science.gov (United States)

    Kerr, K

    1997-01-01

    Shands Hospital in Gainesville, Fla., decided to evaluate the way it provided transcription services in its radiology department. It identified four goals: increased productivity, decreased operating expense, finding much needed space in the radiology department and increasing employee morale. The department performs 165,000 procedures annually, with 66 radiologists, 29 faculty, and 37 residents and fellows on staff. Six FTEs comprised the transcription pool in the radiology department, with transcription their only duty. Transcriptionists were paid an hourly rate based on their years of service, not their productivity. Evaluation and measurement studies were undertaken by the hospital's management systems engineering department. The transcriptionists' hours were then changed to provide coverage during the periods of heaviest dictation. The productivity level of the transcription staff was also measured and various methods of measurement reviewed. The goal was a pure incentive pay plan that would reward employees for every increase in productivity. The incentive pay plan was phased in over a three-month period. Transcriptionists were paid for work performed, with no base pay beyond minimum wage. The move to home-based transcription was planned. The necessary equipment was identified and various issues specific to working at home were addressed. Approximately six months later, the transcriptionists were set up to work at home. The astounding results achieved are presented: 28% increase in productivity, operational cost savings exceeding $25,000 and a space savings of 238 square feet.

  10. Electricity derivative markets: Investment valuation, production planning and hedging

    Energy Technology Data Exchange (ETDEWEB)

    Naesaekkaelae, E.

    2005-07-01

    This thesis studies electricity derivative markets from a view point of an electricity producer. The traditionally used asset pricing methods, based on the no arbitrage principle, are extended to take into account electricity specific features: the non storability of electricity and the variability in the load process. The sources of uncertainty include electricity forward curve, prices of resources used to generate electricity, and the size of the future production. Also the effects of competitors' actions are considered. The thesis illustrates how the information in the derivative prices can be used in investment and production planning. In addition, the use of derivatives as a tool to stabilize electricity dependent cash flows is considered. The results indicate that the information about future electricity prices and their uncertainty, obtained from derivative markets, is important in investment analysis and production planning. (orig.)

  11. Electricity derivative markets: Investment valuation, production planning and hedging

    International Nuclear Information System (INIS)

    Naesaekkaelae, E.

    2005-01-01

    This thesis studies electricity derivative markets from a view point of an electricity producer. The traditionally used asset pricing methods, based on the no arbitrage principle, are extended to take into account electricity specific features: the non storability of electricity and the variability in the load process. The sources of uncertainty include electricity forward curve, prices of resources used to generate electricity, and the size of the future production. Also the effects of competitors' actions are considered. The thesis illustrates how the information in the derivative prices can be used in investment and production planning. In addition, the use of derivatives as a tool to stabilize electricity dependent cash flows is considered. The results indicate that the information about future electricity prices and their uncertainty, obtained from derivative markets, is important in investment analysis and production planning. (orig.)

  12. Refinery production planning and scheduling: the refining core business

    Directory of Open Access Journals (Sweden)

    M. Joly

    2012-06-01

    Full Text Available Intelligent production planning and scheduling are of paramount importance to ensure refinery profitability, logistic reliability and safety at the local and corporate levels. In Brazil, such activities play a particularly critical role, since the Brazilian downstream model is moving towards a demand-driven model rather than a supply-driven one. Moreover, new and specialized non-linear constraints are continuously being incorporated into these large-scale problems: increases in oil prices implying the need for processing poor quality crudes, increasing demand and new demand patterns for petroleum products, new stringent environmental regulations related to clean fuels and start-up of new production technologies embedded into more complex refining schemes. This paper aims at clarifying the central role of refinery planning and scheduling activities in the Petrobras refining business. Major past and present results are outlined and corporate long-term strategies to deal with present and future challenges are presented.

  13. Planning in Sentence Production: Evidence for the Phrase as a Default Planning Scope

    Science.gov (United States)

    Martin, Randi C.; Crowther, Jason E.; Knight, Meredith; Tamborello, Franklin P., II; Yang, Chin-Lung

    2010-01-01

    Controversy remains as to the scope of advanced planning in language production. Smith and Wheeldon (1999) found significantly longer onset latencies when subjects described moving-picture displays by producing sentences beginning with a complex noun phrase than for matched sentences beginning with a simple noun phrase. While these findings are…

  14. Enhanced Simulated Annealing for Solving Aggregate Production Planning

    Directory of Open Access Journals (Sweden)

    Mohd Rizam Abu Bakar

    2016-01-01

    Full Text Available Simulated annealing (SA has been an effective means that can address difficulties related to optimisation problems. SA is now a common discipline for research with several productive applications such as production planning. Due to the fact that aggregate production planning (APP is one of the most considerable problems in production planning, in this paper, we present multiobjective linear programming model for APP and optimised by SA. During the course of optimising for the APP problem, it uncovered that the capability of SA was inadequate and its performance was substandard, particularly for a sizable controlled APP problem with many decision variables and plenty of constraints. Since this algorithm works sequentially then the current state will generate only one in next state that will make the search slower and the drawback is that the search may fall in local minimum which represents the best solution in only part of the solution space. In order to enhance its performance and alleviate the deficiencies in the problem solving, a modified SA (MSA is proposed. We attempt to augment the search space by starting with N+1 solutions, instead of one solution. To analyse and investigate the operations of the MSA with the standard SA and harmony search (HS, the real performance of an industrial company and simulation are made for evaluation. The results show that, compared to SA and HS, MSA offers better quality solutions with regard to convergence and accuracy.

  15. Hierarchical subtask discovery with non-negative matrix factorization

    CSIR Research Space (South Africa)

    Earle, AC

    2018-04-01

    Full Text Available Hierarchical reinforcement learning methods offer a powerful means of planning flexible behavior in complicated domains. However, learning an appropriate hierarchical decomposition of a domain into subtasks remains a substantial challenge. We...

  16. Hierarchical subtask discovery with non-negative matrix factorization

    CSIR Research Space (South Africa)

    Earle, AC

    2017-08-01

    Full Text Available Hierarchical reinforcement learning methods offer a powerful means of planning flexible behavior in complicated domains. However, learning an appropriate hierarchical decomposition of a domain into subtasks remains a substantial challenge. We...

  17. AVLIS Production Plant Preliminary Quality Assurance Plan and Assessment

    International Nuclear Information System (INIS)

    1984-01-01

    This preliminary Quality Assurance Plan and Assessment establishes the Quality Assurance requirements for the AVLIS Production Plant Project. The Quality Assurance Plan defines the management approach, organization, interfaces, and controls that will be used in order to provide adequate confidence that the AVLIS Production Plant design, procurement, construction, fabrication, installation, start-up, and operation are accomplished within established goals and objectives. The Quality Assurance Program defined in this document includes a system for assessing those elements of the project whose failure would have a significant impact on safety, environment, schedule, cost, or overall plant objectives. As elements of the project are assessed, classifications are provided to establish and assure that special actions are defined which will eliminate or reduce the probability of occurrence or control the consequences of failure. 8 figures, 18 tables

  18. USGS QA Plan: Certification of digital airborne mapping products

    Science.gov (United States)

    Christopherson, J.

    2007-01-01

    To facilitate acceptance of new digital technologies in aerial imaging and mapping, the US Geological Survey (USGS) and its partners have launched a Quality Assurance (QA) Plan for Digital Aerial Imagery. This should provide a foundation for the quality of digital aerial imagery and products. It introduces broader considerations regarding processes employed by aerial flyers in collecting, processing and delivering data, and provides training and information for US producers and users alike.

  19. Connected vehicle impacts on transportation planning technical memorandum #2 : connected vehicle planning processes and products and stakeholder roles and responsibilities.

    Science.gov (United States)

    2015-01-01

    The objective of this project, Connected Vehicle Impacts on Transportation Planning, is to comprehensively assess how connected vehicles should : be considered across the range of transportation planning processes and products developed by Stat...

  20. Library orientation on videotape: production planning and administrative support.

    Science.gov (United States)

    Shedlock, J; Tawyea, E W

    1989-01-01

    New student-faculty-staff orientation is an important public service in a medical library and demands creativity, imagination, teaching skill, coordination, and cooperation on the part of public services staff. The Northwestern University Medical Library (NUML) implemented a video production service in the spring of 1986 and used the new service to produce an orientation videotape for incoming students, new faculty, and medical center staff. Planning is an important function in video production, and the various phases of outlining topics, drafting scripts, matching video sequences, and actual taping of video, voice, and music are described. The NUML orientation videotape demonstrates how reference and audiovisual services merge talent and skills to benefit the library user. Videotape production, however, cannot happen in a vacuum of good intentions and high ideals. This paper also presents the management support and cost analysis needed to make video production services a reality for use by public service departments.

  1. A model for marketing planning of new products

    DEFF Research Database (Denmark)

    Martensen, Anne

    1994-01-01

    Executive Summary: 1. A model for forecasting the sales of a new product is presented. This model allows to predict the sales development of a new product before it is actually launched on the market. 2. The model makes separate forecasts for the volume of trial and repeat purchases. It also...... incorporates a special model to explain consumer awareness of the new product. 3. Consumer awareness is explained by distribution (shelf facings and in-store promotion), advertising and giving away free samples. 4. The trial model incorporates the total market potential, the probability of being in a buying...... the product after some time. 6. The model requires three types of data input: market data, market research data, and marketing plan data. Using these data, prediction can be made by a user-friendly PC programme. 7. An example is shown demonstrating that the predictions made by the model were in good...

  2. Improving productivity and firm performance with enterprise resource planning

    Science.gov (United States)

    Beheshti, Hooshang M.; Beheshti, Cyrus M.

    2010-11-01

    Productivity is generally considered to be the efficient utilisation of organisational resources and is measured in terms of the efficiency of a worker, company or nation. Focusing on efficiency alone, however, can be harmful to the organisation's long-term success and competitiveness. The full benefits of productivity improvement measures are realised when productivity is examined from two perspectives: operational efficiency (output/input) of an individual worker or a business unit as well as performance (effectiveness) with regard to end user or customer satisfaction. Over the years, corporations have adopted new technology to integrate business activities in order to achieve both effectiveness and efficiency in their operations. In recent years, many firms have invested in enterprise resource planning (ERP) in order to integrate all business activities into a uniform system. The implementation of ERP enables the firm to reduce the transaction costs of the business and improve its productivity, customer satisfaction and profitability.

  3. Production Planning with Respect to Uncertainties. Simulator Based Production Planning of Average Sized Combined Heat and Power Production Plants; Produktionsplanering under osaekerhet. Simulatorbaserad produktionsplanering av medelstora kraftvaermeanlaeggningar

    Energy Technology Data Exchange (ETDEWEB)

    Haeggstaahl, Daniel [Maelardalen Univ., Vaesteraas (Sweden); Dotzauer, Erik [AB Fortum, Stockholm (Sweden)

    2004-12-01

    Production planning in Combined Heat and Power (CHP) systems is considered. The focus is on development and use of mathematical models and methods. Different aspects on production planning are discussed, including weather and load predictions. Questions relevant on the different planning horizons are illuminated. The main purpose with short-term (one week) planning is to decide when to start and stop the production units, and to decide how to use the heat storage. The main conclusion from the outline of pros and cons of commercial planning software are that several are using Mixed Integer Programming (MIP). In that sense they are similar. Building a production planning model means that the planning problem is formulated as a mathematical optimization problem. The accuracy of the input data determines the practical detail level of the model. Two alternatives to the methods used in today's commercial programs are proposed: stochastic optimization and simulator-based optimization. The basic concepts of mathematical optimization are outlined. A simulator-based model for short-term planning is developed. The purpose is to minimize the production costs, depending on the heat demand in the district heating system, prices of electricity and fuels, emission taxes and fees, etc. The problem is simplified by not including any time-linking conditions. The process model is developed in IPSEpro, a heat and mass-balance software from SimTech Simulation Technology. TOMLAB, an optimization toolbox in MATLAB, is used as optimizer. Three different solvers are applied: glcFast, glcCluster and SNOPT. The link between TOMLAB and IPSEpro is accomplished using the Microsoft COM technology. MATLAB is the automation client and contains the control of IPSEpro and TOMLAB. The simulator-based model is applied to the CHP plant in Eskilstuna. Two days are chosen and analyzed. The optimized production is compared to the measured. A sensitivity analysis on how variations in outdoor

  4. Visual Grouping in Accordance With Utterance Planning Facilitates Speech Production

    Directory of Open Access Journals (Sweden)

    Liming Zhao

    2018-03-01

    Full Text Available Research on language production has focused on the process of utterance planning and involved studying the synchronization between visual gaze and the production of sentences that refer to objects in the immediate visual environment. However, it remains unclear how the visual grouping of these objects might influence this process. To shed light on this issue, the present research examined the effects of the visual grouping of objects in a visual display on utterance planning in two experiments. Participants produced utterances of the form “The snail and the necklace are above/below/on the left/right side of the toothbrush” for objects containing these referents (e.g., a snail, a necklace and a toothbrush. These objects were grouped using classic Gestalt principles of color similarity (Experiment 1 and common region (Experiment 2 so that the induced perceptual grouping was congruent or incongruent with the required phrasal organization. The results showed that speech onset latencies were shorter in congruent than incongruent conditions. The findings therefore reveal that the congruency between the visual grouping of referents and the required phrasal organization can influence speech production. Such findings suggest that, when language is produced in a visual context, speakers make use of both visual and linguistic cues to plan utterances.

  5. Visual Grouping in Accordance With Utterance Planning Facilitates Speech Production.

    Science.gov (United States)

    Zhao, Liming; Paterson, Kevin B; Bai, Xuejun

    2018-01-01

    Research on language production has focused on the process of utterance planning and involved studying the synchronization between visual gaze and the production of sentences that refer to objects in the immediate visual environment. However, it remains unclear how the visual grouping of these objects might influence this process. To shed light on this issue, the present research examined the effects of the visual grouping of objects in a visual display on utterance planning in two experiments. Participants produced utterances of the form "The snail and the necklace are above/below/on the left/right side of the toothbrush" for objects containing these referents (e.g., a snail, a necklace and a toothbrush). These objects were grouped using classic Gestalt principles of color similarity (Experiment 1) and common region (Experiment 2) so that the induced perceptual grouping was congruent or incongruent with the required phrasal organization. The results showed that speech onset latencies were shorter in congruent than incongruent conditions. The findings therefore reveal that the congruency between the visual grouping of referents and the required phrasal organization can influence speech production. Such findings suggest that, when language is produced in a visual context, speakers make use of both visual and linguistic cues to plan utterances.

  6. Effective Heuristics for Capacitated Production Planning with Multiperiod Production and Demand with Forecast Band Refinement

    OpenAIRE

    Philip Kaminsky; Jayashankar M. Swaminathan

    2004-01-01

    In this paper we extend forecast band evolution and capacitated production modelling to the multiperiod demand case. In this model, forecasts of discrete demand for any period are modelled as bands and defined by lower and upper bounds on demand, such that future forecasts lie within the current band. We develop heuristics that utilize knowledge of demand forecast evolution to make production decisions in capacitated production planning environments. In our computational study we explore the ...

  7. Can Differentiated Production Planning and Control enable both Responsiveness and Efficiency in Food Production?

    Directory of Open Access Journals (Sweden)

    Anita Romsdal

    2014-07-01

    Full Text Available This paper addresses the complex production planning and control (PPC challenges in food supply chains. The study illustrates how food producers' traditional make‐to‐stock (MTS approach is not well suited to meet the trends of increasing product variety, higher demand uncertainty, increasing sales of fresh food products and more demanding customers. The paper proposes a framework for differentiated PPC that combines MTS with make‐to‐order (MTO.The framework matches products with the most appropriate PPC approaches and buffering techniques depending on market and product characteristics. The core idea is to achieve more volume flexibility in the production system by exploiting favourable product and market characteristics (high demand predictability, long customer order leadtime allowances and low product perishability. A case study is used to demonstrate how the framework can enable food producers to achieve efficiency in production, inventory and PPC processes – and simultaneously be responsive to market requirements.

  8. Planning of optimum production from a natural gas field

    Energy Technology Data Exchange (ETDEWEB)

    Van Dam, J

    1968-03-01

    The design of an optimum development plan for a natural gas field always depends on the typical characteristics of the producing field, as well as those of the market to be served by this field. Therefore, a good knowledge of the field parameters, such as the total natural gas reserves, the well productivity, and the dependence of production rates on pipeline pressure and depletion of natural gas reserves, is required prior to designing the development scheme of the field, which in fact depends on the gas-sales contract to be concluded in order to commit the natural gas reserves to the market. In this paper these various technical parameters are discussed in some detail, and on this basis a theoretical/economical analysis of natural gas production is given. For this purpose a simplified economical/mathematical model for the field is proposed, from which optimum production rates at various future dates can be calculated. The results of these calculations are represented in a dimensionless diagram which may serve as an aid in designing optimum development plans for a natural gas field. The use of these graphs is illustrated in a few examples.

  9. Optimal Control Approaches to the Aggregate Production Planning Problem

    Directory of Open Access Journals (Sweden)

    Yasser A. Davizón

    2015-12-01

    Full Text Available In the area of production planning and control, the aggregate production planning (APP problem represents a great challenge for decision makers in production-inventory systems. Tradeoff between inventory-capacity is known as the APP problem. To address it, static and dynamic models have been proposed, which in general have several shortcomings. It is the premise of this paper that the main drawback of these proposals is, that they do not take into account the dynamic nature of the APP. For this reason, we propose the use of an Optimal Control (OC formulation via the approach of energy-based and Hamiltonian-present value. The main contribution of this paper is the mathematical model which integrates a second order dynamical system coupled with a first order system, incorporating production rate, inventory level, and capacity as well with the associated cost by work force in the same formulation. Also, a novel result in relation with the Hamiltonian-present value in the OC formulation is that it reduces the inventory level compared with the pure energy based approach for APP. A set of simulations are provided which verifies the theoretical contribution of this work.

  10. Integration of landslide susceptibility products in the environmental plans

    Science.gov (United States)

    Fiorucci, Federica; Reichenbach, Paola; Rossi, Mauro; Cardinali, Mauro; Guzzetti, Fausto

    2015-04-01

    Landslides are one of the most destructive natural hazard that causes damages to urban area worldwide. The knowledge of where a landslide could occur is essential for the strategic management of the territory and for a good urban planning . In this contest landslide susceptibility zoning (LSZ) is crucial to provide information on the degree to which an area can be affected by future slope movements. Despite landslide susceptibility maps have been prepared extensively during the last decades, there are few examples of application is in the environmental plans (EP). In this work we present a proposal for the integration of the landslide inventory map with the following landslide susceptibility products: (i) landslide susceptibility zonation , (ii) the associated error map and (iii) the susceptibility uncertainty map. Moreover we proposed to incorporate detailed morphological studies for the evaluation of landslide risk associated to local parceling plan. The integration of all this information is crucial for the management of landslide risk in urban expansions forecasts. Municipality, province and regional administration are often not able to support the costs of landslide risk evaluation for extensive areas but should concentrate their financial resources to specific hazardous and unsafe situations defined by the result of the integration of landslide susceptibility products. Zonation and detail morphological analysis should be performed taking into account the existing laws and regulations, and could become a starting point to discuss new regulations for the landslide risk management.

  11. Human Factors And Ergonomics In The Planning Of Production

    DEFF Research Database (Denmark)

    Jensen, Per Langå

    2002-01-01

    For year’s integration of ergonomics into the planning of new production processes has been an ideal for regulating agencies supported by ergonomic experts. But the ideal appears to be difficult to live up to. A development of tools both by agencies and by groups of researchers has been seen...... of organizational conditions for giving ergonomics a stronger position in the firm. Ergonomists have to tackle these issues, but it implies a new understanding of their roles, which goes beyond the traditional discussion of expert versus facilitator. The paper is based on an evaluation of a Swedish research......-programme of a new approach to intervention studies on musculosceletaldiseases, on a major Danish research programme on integrating ergonomics (working environment) into the planning activities of the enterprises and on discussions with the staff of the Danish mandatory occupational health and safety services...

  12. Methods and Algorithms for Economic MPC in Power Production Planning

    DEFF Research Database (Denmark)

    Sokoler, Leo Emil

    in real-time. A generator can represent a producer of electricity, a consumer of electricity, or possibly both. Examples of generators are heat pumps, electric vehicles, wind turbines, virtual power plants, solar cells, and conventional fuel-fired thermal power plants. Although this thesis is mainly...... concerned with EMPC for minutes-ahead production planning, we show that the proposed EMPC scheme can be extended to days-ahead planning (including unit commitment) as well. The power generation from renewable energy sources such as wind and solar power is inherently uncertain and variable. A portfolio...... design an algorithm based on the alternating direction method of multipliers (ADMM) to solve input-constrained OCPs with convex objective functions. The OCPs that occur in EMPC of dynamically decoupled subsystems, e.g. power generators, have a block-angular structure. Subsystem decomposition algorithms...

  13. PRODUCT LIFECYCLE OPTIMISATION OF CAR CLIMATE CONTROLS USING ANALYTICAL HIERARCHICAL PROCESS (AHP ANALYSIS AND A MULTI-OBJECTIVE GROUPING GENETIC ALGORITHM (MOGGA

    Directory of Open Access Journals (Sweden)

    MICHAEL J. LEE

    2016-01-01

    Full Text Available A product’s lifecycle performance (e.g. assembly, outsourcing, maintenance and recycling can often be improved through modularity. However, modularisation under different and often conflicting lifecycle objectives is a complex problem that will ultimately require trade-offs. This paper presents a novel multi-objective modularity optimisation framework; the application of which is illustrated through the modularisation of a car climate control system. Central to the framework is a specially designed multi-objective grouping genetic algorithm (MOGGA that is able to generate a whole range of alternative product modularisations. Scenario analysis, using the principles of the analytical hierarchical process (AHP, is then carried out to explore the solution set and choose a suitable modular architecture that optimises the product lifecycle according to the company’s strategic vision.

  14. Multi-assortment rhythmic production planning and control

    Science.gov (United States)

    Skolud, B.; Krenczyk, D.; Zemczak, M.

    2015-11-01

    A method for production planning in a repetitive manufacturing system which allows for estimating the possibility of processing work orders in due time is presented. The difference between two approaches are presented; the first one one-piece flow elaborated in Toyota and the second one elaborated by authors that consists in defining sufficient conditions to filter all solutions and providing a set of admissible solutions for both the client and the producer. In the paper attention is focused on the buffer allocation. Illustrative examples are presented.

  15. A production model and maintenance planning model for the process industry

    NARCIS (Netherlands)

    Ashayeri, J.; Teelen, A.; Selen, W.J.

    1995-01-01

    In this paper a model is developed to simultaneously plan preventive maintenance and production in a process industry environment, where maintenance planning is extremely important. The model schedules production jobs and preventive maintenance jobs, while minimizing costs associated with

  16. A Graphical Interactive Simulation Environment for Production Planning in Bacon Factories

    DEFF Research Database (Denmark)

    Nielsen, Kirsten Mølgaard; Nielsen, Jens Frederik Dalsgaard

    1994-01-01

    The paper describes a graphical interactive simulation tool for production planning in bacon factories........The paper describes a graphical interactive simulation tool for production planning in bacon factories.....

  17. Hierarchic control of the production of energy by means of plants of distributed solar collectors; Control jerarquico de la produccion de energia mediante plantas de colectores solares distribuidos

    Energy Technology Data Exchange (ETDEWEB)

    Martinez Cirre, C. R.

    2008-07-01

    This work presents several different approaches to hierarchical control algorithms designed for a parabolic-trough solar collector field to demonstrate the possibility of maximizing hypothetical profit possible from this type of plant by improving and increasing plant automation. This study was developed in the current world power supply scenario, posing the possibility of using renewable energies (among which is solar thermal power), which the author is interested in contributing to advancing through research on improved plant operation control. The design was made for the ACUREX distributed solar collector field at the Plataforma Solar de Almeria. The control structures implemented to improve production in the solar collector field are based on a simple two-layered hierarchical control. One regulation layer (Layer 1) in which two proposals have been implemented: a control scheme developed using the feedback linearization technique and another proposal consisting on parallel deed forward control with an I-PD (Integral-Proportional Derivative) control. three proposals were implemented in the top layer (Layer 2) for generating the setpoint, the first one based on a physical model, the second one based on a fuzzy model, and the last uses the physical model and an optimization function for finding the optimum setpoint. (Author)

  18. Implementation of Logic Flow in Planning and Production Control

    Directory of Open Access Journals (Sweden)

    Ulewicz Robert

    2016-03-01

    Full Text Available The article presents the results of analysis, the use of continuous flow of logic at the stage of production planning and control of the company producing furniture. The concept of continuous flow tends to regulate the flow of materials in a manner that provides the shortest flow path without unnecessary activities (Muda is a Japanese word meaning waste, a constant takt and defined throughput at constant resource requirements for the so-called transfer of material through the whole process. In the study Glenday’d sieve method was used to identify the correct area, which requires the value stream mapping, and areas called excessive complexity, which do not provide added value. The use of Glenday’s sieve method made it possible to identify areas in which it must be improve production capacity.

  19. Analytic network process (ANP approach for product mix planning in railway industry

    Directory of Open Access Journals (Sweden)

    Hadi Pazoki Toroudi

    2016-08-01

    Full Text Available Given the competitive environment in the global market in recent years, organizations need to plan for increased profitability and optimize their performance. Planning for an appropriate product mix plays essential role for the success of most production units. This paper applies analytical network process (ANP approach for product mix planning for a part supplier in Iran. The proposed method uses four criteria including cost of production, sales figures, supply of raw materials and quality of products. In addition, the study proposes different set of products as alternatives for production planning. The preliminary results have indicated that that the proposed study of this paper could increase productivity, significantly.

  20. Model business plan for a sterile insect production facility

    International Nuclear Information System (INIS)

    2008-01-01

    For over 50 years the sterile insect technique (SIT) is a pest control strategy which has been used for eradication, and more recently for suppression, containment and prevention, of unwanted insect pest populations. Examples of successful applications of SIT, almost always applied in conjunction with other control methods in an area-wide integrated approach, are available from around the world. The development and application of SIT has relied overwhelmingly on public or donor initiative and funding throughout its history, although the private sector has always been involved as participants, cooperators or partners in funding. The demand for SIT, and therefore the market for sterile insects, has increased in recent years. This increase coincides with the introduction of new pests through the expansion of global trade and, at the same time, widespread pressure to find alternatives to pesticides. Recent improvements in the technology supporting SIT facilitate its application and suggest lower costs can be achieved. The conditions are therefore met for a greater commercialization of the technique to bring it in line with other pest control approaches that are fully integrated into a market approach. Several challenges arise, however, in pursuing sterile insect production as a commercial venture, ranging from intellectual property protection to pricing of the product. Routine insurance requirements, for instance, are complicated by the biological aspects of the business. This report is aimed at facilitating private sector involvement in the production of sterile insects for use in pest control. It provides guidelines and tools to support the development of specific business plans for a new SIT venture. By providing an international perspective on such issues as initial capital costs and recurring operational expenditures for a sterile insect facility, it may be used to evaluate the feasibility of proceeding with the construction or expansion of a sterile insect

  1. Proposing an Aggregate Production Planning Model by Goal Programming Approach, a Case Study

    Directory of Open Access Journals (Sweden)

    Mansoureh Farzam Rad

    2014-06-01

    Full Text Available Production planning is one of the most important functions in the process of production management. Production planning in the intermediate range of time is termed as aggregate production planning (APP. Aggregate production planning is an important upper level planning activity in a production management system. The present study tries to suggest an aggregate production planning model for products of Hafez tile factory during one year. Due to this fact that the director of the company seeks 3 main objectives to determine the optimal production rate, the linear goal planning method was employed. After solving the problem, in order to examine the efficiency and the distinctiveness of this method in compare to linear programming, the problem was modeled just by considering one objective then was solved by linear programming approach. The findings revealed the goal programming with multi objectives resulted more appropriate solution rather than linear programming with just one objective.

  2. Radioisotope Production Plan and Strategy of Kijang Research Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Kye Hong; Lee, Jun Sig [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-05-15

    This reactor will be located at Kijang, Busan, Korea and be dedicated to produce mainly medical radioisotopes. Tc-99m is very important isotope for diagnosis and more than 80% of radiation diagnostic procedures in nuclear medicine depend on this isotope. There were, however, several times of insecure production of Mo-99 due to the shutdown of major production reactors worldwide. OECD/NEA is leading member countries to resolve the shortage of this isotope and trying to secure the international market of Mo-99. The radioisotope plan and strategy of Kijang Research Reactor (KJRR) should be carefully established to fit not only the domestic but also international demand on Mo-99. The implementation strategy of 6 principles of HLG-MR should be established that is appropriate to national environments. Ministry of Science, ICT and Future Planning and Ministry of Health and welfare should cooperate well to organize the national radioisotope supply structure, to set up the reasonable and competitive pricing of radioisotopes, and to cope with the international supply strategy.

  3. Multiperiod planning tool for multisite pig production systems.

    Science.gov (United States)

    Nadal-Roig, E; Plà, L M

    2014-09-01

    This paper presents a multiperiod planning tool for multisite pig production systems based on Linear Programming (LP). The aim of the model is to help pig managers of multisite systems in making short-term decisions (mainly related to pig transfers between farms and batch management in fattening units) and mid-term or long-term decisions (according to company targets and expansion strategy). The model skeleton follows the structure of a three-site system that can be adapted to any multisite system present in the modern pig industry. There are three basic phases, namely, piglet production, rearing pigs, and fattening. Each phase involves a different set of farms; therefore, transportation between farms and delivering of pigs to the abattoir are under consideration. The model maximizes the total gross margin calculated from the income of sales to the abattoir and the production costs over the time horizon considered. Production cost depends on each type of farm involved in the process. Parameters like number of farms per phase and distance, farm capacity, reproduction management policies, feeding and veterinary expenses, and transportation costs are taken into account. The model also provides a schedule of transfers between farms in terms of animals to be transported and number of trucks involved. The use of the model is illustrated with a case study based on a real instance of a company located in Catalonia (Spain).

  4. A roadmap for cost-of-goods planning to guide economic production of cell therapy products.

    Science.gov (United States)

    Lipsitz, Yonatan Y; Milligan, William D; Fitzpatrick, Ian; Stalmeijer, Evelien; Farid, Suzanne S; Tan, Kah Yong; Smith, David; Perry, Robert; Carmen, Jessica; Chen, Allen; Mooney, Charles; Fink, John

    2017-12-01

    Cell therapy products are frequently developed and produced without incorporating cost considerations into process development, contributing to prohibitively costly products. Herein we contextualize individual process development decisions within a broad framework for cost-efficient therapeutic manufacturing. This roadmap guides the analysis of cost of goods (COG) arising from tissue procurement, material acquisition, facility operation, production, and storage. We present the specific COG considerations related to each of these elements as identified through a 2013 International Society for Cellular Therapy COG survey, highlighting the differences between autologous and allogeneic products. Planning and accounting for COG at each step in the production process could reduce costs, allowing for more affordable market pricing to improve the long-term viability of the cell therapy product and facilitate broader patient access to novel and transformative cell therapies. Copyright © 2017 International Society for Cellular Therapy. Published by Elsevier Inc. All rights reserved.

  5. Developing and promoting OKP production system: a JIT production planning approach

    Science.gov (United States)

    Samavati, Mehran

    2011-10-01

    The role of production in competitive system of market on one hand and the changing conditions of market on the other hand has caused the need for more developed planning in such environments. The general purpose of the present research is to realize One-of- a- Kind- Product model (OKP) that is developed in two stages. In OKP model presented in 1994 only one sample of each product is produced and only one production method is considered for each product. In order to make OKP model more real and to use it in promoting more production methods, the following developments were made in this research: 1-First Development: Considering various methods for producing each product. 2-Second Development: Producing more than one sample of each product, while considering various production methods for each product. These models promoted OKP model of 1994. They can be used in more diversified production methods in order to promote them. In present model, while describing the main OKP model new models are provided as well. The significance of OKP has been described in Introduction

  6. Functional annotation of hierarchical modularity.

    Directory of Open Access Journals (Sweden)

    Kanchana Padmanabhan

    Full Text Available In biological networks of molecular interactions in a cell, network motifs that are biologically relevant are also functionally coherent, or form functional modules. These functionally coherent modules combine in a hierarchical manner into larger, less cohesive subsystems, thus revealing one of the essential design principles of system-level cellular organization and function-hierarchical modularity. Arguably, hierarchical modularity has not been explicitly taken into consideration by most, if not all, functional annotation systems. As a result, the existing methods would often fail to assign a statistically significant functional coherence score to biologically relevant molecular machines. We developed a methodology for hierarchical functional annotation. Given the hierarchical taxonomy of functional concepts (e.g., Gene Ontology and the association of individual genes or proteins with these concepts (e.g., GO terms, our method will assign a Hierarchical Modularity Score (HMS to each node in the hierarchy of functional modules; the HMS score and its p-value measure functional coherence of each module in the hierarchy. While existing methods annotate each module with a set of "enriched" functional terms in a bag of genes, our complementary method provides the hierarchical functional annotation of the modules and their hierarchically organized components. A hierarchical organization of functional modules often comes as a bi-product of cluster analysis of gene expression data or protein interaction data. Otherwise, our method will automatically build such a hierarchy by directly incorporating the functional taxonomy information into the hierarchy search process and by allowing multi-functional genes to be part of more than one component in the hierarchy. In addition, its underlying HMS scoring metric ensures that functional specificity of the terms across different levels of the hierarchical taxonomy is properly treated. We have evaluated our

  7. The design of system for operative planning of blast furnace production process

    Directory of Open Access Journals (Sweden)

    Malindžák Dušan

    1996-12-01

    Full Text Available A system for operative planning of blast furnace production process is described in the paper. The suggested system is based on the use of a new hierarchy of operative plans, consisting of one-month plan, (7+3 days plan, and 24-hour plan. The system allows smoothing of production process at the blast furnace plant, and at the same time satisfies all requirements of the steel plant regarding to the amount of pig iron.

  8. Functional overview of the Production Planning Model (ProdMod)

    International Nuclear Information System (INIS)

    Gregory, M.V.; Paul, P.K.

    1995-09-01

    The Production Planning Model (ProdMod) has been developed by SRTC for use by High Level Waste Program Management and High Level Waste Engineering as a fast running, integrated, comprehensive model of the entire SRS high level waste (HLW) complex. ProdMod can simulate the response of the HLW complex from its current state to the end of tank clean-up or to any intermediate point. The present document describes the initial release of ProdMod at the end of FY95: a model version that contains all the significant elements from the High-level Waste System Plan Revision 5 and is capable of running the simulation all the way to the postulated completion of waste removal. For the scenario represented by this release, that simulates approximately 70 years of operation of the HLW complex (out to FY2065). This initial release of ProdMod will serve as the immediate starting point for the modeling of the High-Level Waste System Plan Revision 6. Thus ProdMod is expected to be in a state of continuous change and improvement.the initial goal has been to generate a simulation of the processes of interest, with the emphasis on mass and volume balances tracked throughout the HLW complex. That has been accomplished. Future development will add a set of cost equations to the process equations and extend the model for use as a linear programming (optimization) application. The goal of this later phase will be to free the ProdMod user to some extent from the need to set up detailed simulation scenarios: the model will automatically make operational choices which minimize or maximize a given objective function. Appendix A contains the source code

  9. Plans for first oil production revived in two Sudanese fields

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    A Vancouver, British Columbia, independent and its Sudanese partner have filed a development plan with the government of Sudan to produce an initial 40,000 b/d from Heglig and Unity oil fields in Sudan. Arakis Energy Corp., and the private Sudanese company State Petroleum Corp. (SPC) want to begin the first commercial hydrocarbon production in the destitute, war torn country. They are picking up where Chevron Corp. left off after years of grappling with an ambitious, costly - and ultimately futile - effort to export crude-oil from Sudan. After finding almost 300 million bbl of oil in Sudan during the early 1980s, Chevron scuttled a $2 billion project to export 50,000 b/d of Sudanese crude in 1986. It drilled 90 wells and sank more than $1 billion into the project. But it dropped the plan, citing the 1986 collapse of oil prices and concerns over security after repeated guerrilla attacks delayed work. The paper details the project

  10. Hierarchical partial order ranking

    International Nuclear Information System (INIS)

    Carlsen, Lars

    2008-01-01

    Assessing the potential impact on environmental and human health from the production and use of chemicals or from polluted sites involves a multi-criteria evaluation scheme. A priori several parameters are to address, e.g., production tonnage, specific release scenarios, geographical and site-specific factors in addition to various substance dependent parameters. Further socio-economic factors may be taken into consideration. The number of parameters to be included may well appear to be prohibitive for developing a sensible model. The study introduces hierarchical partial order ranking (HPOR) that remedies this problem. By HPOR the original parameters are initially grouped based on their mutual connection and a set of meta-descriptors is derived representing the ranking corresponding to the single groups of descriptors, respectively. A second partial order ranking is carried out based on the meta-descriptors, the final ranking being disclosed though average ranks. An illustrative example on the prioritisation of polluted sites is given. - Hierarchical partial order ranking of polluted sites has been developed for prioritization based on a large number of parameters

  11. 15 CFR 713.4 - Advance declaration requirements for additionally planned production, processing, or consumption...

    Science.gov (United States)

    2010-01-01

    ... additionally planned production, processing, or consumption of Schedule 2 chemicals. 713.4 Section 713.4..., processing, or consumption of Schedule 2 chemicals. (a) Declaration requirements for additionally planned activities. (1) You must declare additionally planned production, processing, or consumption of Schedule 2...

  12. Plans for industrial production of the SSC magnets

    International Nuclear Information System (INIS)

    Karpenko, V.N.; Rardin, D.C.

    1986-01-01

    The Universities Research Association through its Central Design Group is currently conducting research and development for the Department of Energy on a superconducting super collider (SSC). The proposed SSC is a device in which protons would be accelerated around a ring approximately 50 miles in circumference. The protons would be kept in their path by means of thousands of powerful superconducting magnets. Two such rings of magnets would be housed in a common underground tunnel, allowing groups of protons to be accelerated in opposite directions and collided, in order to study the fundamental nature of matter and energy. The magnet system is a major element of the SSC in terms of technical requirements, quantity of components and cost. In order to meet technical and production requirements imposed by this system early participation of industry is necessary. The program plans were developed with the objective to involve industry in the early stages of research and development of superconducting magnets, leading to cost effective processes of potential mass production of high quality accelerator magnets by industry. While a decision has not been made by the Department of Energy on whether or not to request construction of the SSC project, if such a request is made and the project is authorized and funded, it would lead to industrial manufacture of a large quantity of superconducting magnets

  13. Fuzzy production planning models for an unreliable production system with fuzzy production rate and stochastic/fuzzy demand rate

    Directory of Open Access Journals (Sweden)

    K. A. Halim

    2011-01-01

    Full Text Available In this article, we consider a single-unit unreliable production system which produces a single item. During a production run, the production process may shift from the in-control state to the out-of-control state at any random time when it produces some defective items. The defective item production rate is assumed to be imprecise and is characterized by a trapezoidal fuzzy number. The production rate is proportional to the demand rate where the proportionality constant is taken to be a fuzzy number. Two production planning models are developed on the basis of fuzzy and stochastic demand patterns. The expected cost per unit time in the fuzzy sense is derived in each model and defuzzified by using the graded mean integration representation method. Numerical examples are provided to illustrate the optimal results of the proposed fuzzy models.

  14. Practice of building production planning system of company with a wide range of products - case study

    Directory of Open Access Journals (Sweden)

    Łukasz Hadaś

    2012-09-01

    Full Text Available Background: The complexity of the manufacturing environments of today's mechanical engineering companies and the number of both internal and external restrictions affecting to need of building tailored production planning and control systems. This statement is particularly important in conditions of companies with a wide range of products and different customer service strategies (different locations of the logistics decoupling point otherwise called "order penetration point". Streams of materials in these conditions require different management what is the main reason for carrying out research in business conditions by the authors. Material and methods: The research was carried out in industrial engineering in complex environmental conditions of production. This was a specializing in technology, multi-departments environment, with multiple streams of values and a wide range of products (about 500 items. The work was carried out under the transformation of the production system from the "push" logic of flow to "pull" logic of flow and building a dedicated system based on the best practice approach. Results: The paper describes the process of building tailored hybrid systems in the area of planning and shop flow control of production. The authors present the theoretical considerations on the issue and practical experiences. The authors present factors of selection of the transformation path and its road map. The article describes the part of the authors' own experience in the work on the methodology of transformation of Polish companies in the running business condition. Conclusions: Establishing the methodology of transformation of the production system is not a simple task. This paper presents only selected aspects of complex decision-making process. However, the authors presented work shows the important aspect of the transformation of production systems for these organizational conditions.

  15. A Study on the Optimum Bucket Size for Master Scheduling : For the Case of Hierarchically tured Products

    OpenAIRE

    木内, 正光

    2010-01-01

    The function of master scheduling is to plan the flow of order from its arrival to its completion. In this study, the problem of bucket size for master scheduling is taken up. The bucket size for master scheduling has much influence on the lead time of the order. However, to date there is no clear method for how to set the optimum bucket size. The purpose of this study is to propose a method to set the optimum bucket size. In this paper, an equation to estimate the optimum bucket size is prop...

  16. Products for geoinformation support for spatial planning and management within the framework of the project ONIX

    Directory of Open Access Journals (Sweden)

    Franc J. Zakrajšek

    2000-01-01

    Full Text Available The article gives a brief description of four products in the subproject Geoinformation support for physical planning and spatial management on the local level in the framework of the Onix project. The products are a result of a comprehensive approach to the development of information support, whose main features are unified dealing with planning acts, from the statutory plan and development plans to permitting procedures, multi-disciplinary approach and object oriented information approach.

  17. Hierarchical quark mass matrices

    International Nuclear Information System (INIS)

    Rasin, A.

    1998-02-01

    I define a set of conditions that the most general hierarchical Yukawa mass matrices have to satisfy so that the leading rotations in the diagonalization matrix are a pair of (2,3) and (1,2) rotations. In addition to Fritzsch structures, examples of such hierarchical structures include also matrices with (1,3) elements of the same order or even much larger than the (1,2) elements. Such matrices can be obtained in the framework of a flavor theory. To leading order, the values of the angle in the (2,3) plane (s 23 ) and the angle in the (1,2) plane (s 12 ) do not depend on the order in which they are taken when diagonalizing. We find that any of the Cabbibo-Kobayashi-Maskawa matrix parametrizations that consist of at least one (1,2) and one (2,3) rotation may be suitable. In the particular case when the s 13 diagonalization angles are sufficiently small compared to the product s 12 s 23 , two special CKM parametrizations emerge: the R 12 R 23 R 12 parametrization follows with s 23 taken before the s 12 rotation, and vice versa for the R 23 R 12 R 23 parametrization. (author)

  18. Aggregate Production Planning, Casestudy in a Medium-sized Industry of the Rubber Production Line in Ecuador.

    Science.gov (United States)

    Rosero-Mantilla, César; Sánchez-Sailema, Mayra; Sánchez-Rosero, Carlos; Galleguillos-Pozo, Rosa

    2017-06-01

    This research aims to improve the productivity in the rubber line of a medium-sized industry by increasing the production capacities through the use of the Aggregate Production Planning model. For this purpose an analysis of the production processes of the line was made and the aggregate plan was defined evaluating two strategies: Exact Production Plan (Zero Inventory) and Constant Workforce Plan (Vary Inventory) by studying the costs of both inventory maintenance and workforce. It was also determined how the installed capacity was used with the standards of the rubber line and measures for decreasing production costs were proposed. It was proven that only 70% of the plant capacity was being used so it could be possible to produce more units and to obtain a bigger market for the products of this line.+

  19. Procedural issues in the development of a production plan in the petroleum transport computerized system of plan projects

    Energy Technology Data Exchange (ETDEWEB)

    German, V T; Karlikov, Y P; Papeev, V M; Samorodkin, V D; Vasil' ev, Y I

    1980-01-01

    The process of planning petroleum transportation must be described by a model that may be used to vary the distribution of the volumes of oil transported and to organize the oil flows so as to satisfy users requiring a particular volume of unprocessed petroleum. By means of the studies performed here, a number of conclusions may be drawn: 1. Available algorithms make it possible to compute the detailed network-wide indicators for petroleum transportation in the annual planning model; determine the capacities needed for individual members of the network; and create the necessary list of output documents for compliation of the tenative plan of production for oil transport; 2. An implementation of the oil transport plan using the specified route method should be based on an heuristic approach (a route is specified by a specialist or the routes of the current year are used), thereby allowing us to obtain the necessary production plans.

  20. Optimum oil production planning using infeasibility driven evolutionary algorithm.

    Science.gov (United States)

    Singh, Hemant Kumar; Ray, Tapabrata; Sarker, Ruhul

    2013-01-01

    In this paper, we discuss a practical oil production planning optimization problem. For oil wells with insufficient reservoir pressure, gas is usually injected to artificially lift oil, a practice commonly referred to as enhanced oil recovery (EOR). The total gas that can be used for oil extraction is constrained by daily availability limits. The oil extracted from each well is known to be a nonlinear function of the gas injected into the well and varies between wells. The problem is to identify the optimal amount of gas that needs to be injected into each well to maximize the amount of oil extracted subject to the constraint on the total daily gas availability. The problem has long been of practical interest to all major oil exploration companies as it has the potential to derive large financial benefit. In this paper, an infeasibility driven evolutionary algorithm is used to solve a 56 well reservoir problem which demonstrates its efficiency in solving constrained optimization problems. Furthermore, a multi-objective formulation of the problem is posed and solved using a number of algorithms, which eliminates the need for solving the (single objective) problem on a regular basis. Lastly, a modified single objective formulation of the problem is also proposed, which aims to maximize the profit instead of the quantity of oil. It is shown that even with a lesser amount of oil extracted, more economic benefits can be achieved through the modified formulation.

  1. The application of dynamic programming in production planning

    Science.gov (United States)

    Wu, Run

    2017-05-01

    Nowadays, with the popularity of the computers, various industries and fields are widely applying computer information technology, which brings about huge demand for a variety of application software. In order to develop software meeting various needs with most economical cost and best quality, programmers must design efficient algorithms. A superior algorithm can not only soul up one thing, but also maximize the benefits and generate the smallest overhead. As one of the common algorithms, dynamic programming algorithms are used to solving problems with some sort of optimal properties. When solving problems with a large amount of sub-problems that needs repetitive calculations, the ordinary sub-recursive method requires to consume exponential time, and dynamic programming algorithm can reduce the time complexity of the algorithm to the polynomial level, according to which we can conclude that dynamic programming algorithm is a very efficient compared to other algorithms reducing the computational complexity and enriching the computational results. In this paper, we expound the concept, basic elements, properties, core, solving steps and difficulties of the dynamic programming algorithm besides, establish the dynamic programming model of the production planning problem.

  2. Digital Radiography and Computed Tomography (DRCT) Product Improvement Plan (PIP)

    Energy Technology Data Exchange (ETDEWEB)

    Tim Roney; Bob Pink; Karen Wendt; Robert Seifert; Mike Smith

    2010-12-01

    The Idaho National Laboratory (INL) has been developing and deploying x-ray inspection systems for chemical weapons containers for the past 12 years under the direction of the Project Manager for Non-Stockpile Chemical Materiel (PMNSCM). In FY-10 funding was provided to advance the capabilities of these systems through the DRCT (Digital Radiography and Computed Tomography) Product Improvement Plan (PIP), funded by the PMNSCM. The DRCT PIP identified three research tasks; end user study, detector evaluation and DRCT/PINS integration. Work commenced in February, 2010. Due to the late start and the schedule for field inspection of munitions at various sites, it was not possible to spend sufficient field time with operators to develop a complete end user study. We were able to interact with several operators, principally Mr. Mike Rowan who provided substantial useful input through several discussions and development of a set of field notes from the Pueblo, CO field mission. We will be pursuing ongoing interactions with field personnel as opportunities arise in FY-11.

  3. Fabrication of Hierarchically Micro- and Nano-structured Mold Surfaces Using Laser Ablation for Mass Production of Superhydrophobic Surfaces

    Science.gov (United States)

    Noh, Jiwhan; Lee, Jae-Hoon; Na, Suckjoo; Lim, Hyuneui; Jung, Dae-Hwan

    2010-10-01

    Many studies have examined the formation of surfaces with mixed patterns of micro- and nano-sized lotus leaves that have hydrophobic properties. In this study, micro- and nano-shapes such as lotus leaves were fabricated on a metal mold surface using laser ablation and ripple formation. A microstructure on the mold surface was replicated onto poly(dimethylsiloxane) (PDMS) using the polymer casting method to manufacture low-cost hydrophobic surfaces. A PDMS surface with micro- and nano-structures that were the inverse image of a lotus leaf showed hydrophobic characteristics (water contact angle: 157°). From these results, we deduced that portions of the microstructures were wet and that air gaps existed between the microstructures and the water drops. In this paper we suggest the possibility of the mass production of hydrophobic plastic surfaces and the development of a methodology for the hydrophobic texturing of various polymer surfaces, using the polymer casting method with laser-processed molds.

  4. Hierarchically Nanoporous Bioactive Glasses for High Efficiency Immobilization of Enzymes

    DEFF Research Database (Denmark)

    He, W.; Min, D.D.; Zhang, X.D.

    2014-01-01

    Bioactive glasses with hierarchical nanoporosity and structures have been heavily involved in immobilization of enzymes. Because of meticulous design and ingenious hierarchical nanostructuration of porosities from yeast cell biotemplates, hierarchically nanostructured porous bioactive glasses can...... and products of catalytic reactions can freely diffuse through open mesopores (2–40 nm). The formation mechanism of hierarchically structured porous bioactive glasses, the immobilization mechanism of enzyme and the catalysis mechanism of immobilized enzyme are then discussed. The novel nanostructure...

  5. 75 FR 55776 - Request for Comments on Vaccine Production and Additional Planning for Future Possible Pandemic...

    Science.gov (United States)

    2010-09-14

    ... Production and Additional Planning for Future Possible Pandemic Influenza AGENCY: International Trade... additional planning for future possible pandemic influenza. DATES: Written comments must be submitted on or... influenza pandemic (see World Health Organization announcement of August 10, 2010) and the need to plan for...

  6. Logistic planning and control of reworking perishable production defectives

    NARCIS (Netherlands)

    R.H. Teunter (Ruud); S.D.P. Flapper

    2001-01-01

    textabstractWe consider a production line that is dedicated to a single product. Produced lots may be non-defective, reworkable defective, or non-reworkable defective. The production line switches between production and rework. After producing a fixed number (N) of lots, all reworkable defective

  7. An MILP approach to shelf life integrated planning and scheduling in scalded sausage production

    DEFF Research Database (Denmark)

    Günther, H.O.; van Beek, P.; Grunow, Martin

    2006-01-01

    in which shelf life aspects are integrated into operational production planning and scheduling functions. Specifically we make use of so-called Mixed Integer Linear Programming (MILP) models. Our research is based on an industrial case study of yogurt production. Relying on the principle of block planning...

  8. National Contingency Plan (NCP) Subpart J Product Schedule Fact Sheet

    Science.gov (United States)

    This section of the National Oil and Hazardous Substances Pollution Contingency Plan stipulates the criteria for listing and managing the use of dispersants and other chemical and biological agents used to mitigate oil spills.

  9. An MILP modeling approach for shelf life integrated planning in yoghurt production

    NARCIS (Netherlands)

    Lütke Entrup, M.; Grunow, M.; Günther, H.O.; Seiler, T.; Beek, van P.

    2005-01-01

    In the production of perishable products such as dairy, meat, or bakery goods, the consideration of shelf life in production planning is of particular importance. Retail customers with relatively low inventory turns can benefit significantly from longer product shelf life as wastage and out-of-stock

  10. Final Report of Optimization Algorithms for Hierarchical Problems, with Applications to Nanoporous Materials

    Energy Technology Data Exchange (ETDEWEB)

    Nash, Stephen G.

    2013-11-11

    The research focuses on the modeling and optimization of nanoporous materials. In systems with hierarchical structure that we consider, the physics changes as the scale of the problem is reduced and it can be important to account for physics at the fine level to obtain accurate approximations at coarser levels. For example, nanoporous materials hold promise for energy production and storage. A significant issue is the fabrication of channels within these materials to allow rapid diffusion through the material. One goal of our research is to apply optimization methods to the design of nanoporous materials. Such problems are large and challenging, with hierarchical structure that we believe can be exploited, and with a large range of important scales, down to atomistic. This requires research on large-scale optimization for systems that exhibit different physics at different scales, and the development of algorithms applicable to designing nanoporous materials for many important applications in energy production, storage, distribution, and use. Our research has two major research thrusts. The first is hierarchical modeling. We plan to develop and study hierarchical optimization models for nanoporous materials. The models have hierarchical structure, and attempt to balance the conflicting aims of model fidelity and computational tractability. In addition, we analyze the general hierarchical model, as well as the specific application models, to determine their properties, particularly those properties that are relevant to the hierarchical optimization algorithms. The second thrust was to develop, analyze, and implement a class of hierarchical optimization algorithms, and apply them to the hierarchical models we have developed. We adapted and extended the optimization-based multigrid algorithms of Lewis and Nash to the optimization models exemplified by the hierarchical optimization model. This class of multigrid algorithms has been shown to be a powerful tool for

  11. Integrated production planning and control: A multi-objective optimization model

    Directory of Open Access Journals (Sweden)

    Cheng Wang

    2013-09-01

    Full Text Available Purpose: Production planning and control has crucial impact on the production and business activities of enterprise. Enterprise Resource Planning (ERP is the most popular resources planning and management system, however there are some shortcomings and deficiencies in the production planning and control because its core component is still the Material Requirements Planning (MRP. For the defects of ERP system, many local improvement and optimization schemes have been proposed, and improve the feasibility and practicality of the plan in some extent, but study considering the whole planning system optimization in the multiple performance management objectives and achieving better application performance is less. The purpose of this paper is to propose a multi-objective production planning optimization model Based on the point of view of the integration of production planning and control, in order to achieve optimization and control of enterprise manufacturing management. Design/methodology/approach: On the analysis of ERP planning system’s defects and disadvantages, and related research and literature, a multi-objective production planning optimization model is proposed, in addition to net demand and capacity, multiple performance management objectives, such as on-time delivery, production balance, inventory, overtime production, are considered incorporating into the examination scope of the model, so that the manufacturing process could be management and controlled Optimally between multiple objectives. The validity and practicability of the model will be verified by the instance in the last part of the paper. Findings: The main finding is that production planning management of manufacturing enterprise considers not only the capacity and materials, but also a variety of performance management objectives in the production process, and building a multi-objective optimization model can effectively optimize the management and control of enterprise

  12. A Predictive Model of Multi-Stage Production Planning for Fixed Time Orders

    Directory of Open Access Journals (Sweden)

    Kozłowski Edward

    2014-09-01

    Full Text Available The traditional production planning model based upon a deterministic approach is well described in the literature. Due to the uncertain nature of manufacturing processes, such model can however incorrectly represent actual situations on the shop floor. This study develops a mathematical modeling framework for generating production plans in a multistage manufacturing process. The devised model takes into account the stochastic model for predicting the occurrence of faulty products. The aim of the control model is to determine the number of products which should be manufactured in each planning period to minimize both manufacturing costs and potential financial penalties for failing to fulfill the order completely.

  13. Production and planning organization at coal mines. Organizatsiya proizvodstva i planirovanie na ugol'nykh shakhtakh

    Energy Technology Data Exchange (ETDEWEB)

    Rybnikov, S E; Voloshin, A P

    1981-01-01

    A discussion is made of problems concerning the organization of production, labor, and planning at enterprises of the coal industry. Theoretical and methodological principles are given for production organization, standardization and renumeration of wages, production planning and the use of available capacity. Computations are given for optimal numbers of workers, the essential growth in productivity, material expenditures for coal recovery, lowering production costs, and increasing the profitability of enterprise operations. Particular attention is given to the operation of mines of production and associations, organizational and practical problems concerned with the technical retooling of coal mines, and improving management and planning. The teaching aid is intended for students at coal technical institutes specializing in planning at enterprises of the coal industry. 14 references, 26 figures, 14 tables.

  14. Integrating design and production planning with knowledge-based inspection planning system

    International Nuclear Information System (INIS)

    Abbasi, Ghaleb Y.; Ketan, Hussein S.; Adil, Mazen B.

    2005-01-01

    In this paper an intelligent environment to integrate design and inspection earlier to the design stage. A hybrid knowledge-based approach integrating computer-aided design (CAD) and computer-aided inspection planning (CAIP) was developed, thereafter called computer-aided design and inspection planning (CADIP). CADIP was adopted for automated dimensional inspection planning. Critical functional features were screened based on certain attributes for part features for inspection planning application. Testing the model resulted in minimizing the number of probing vectors associated with the most important features in the inspected prismatic part, significant reduction in inspection costs and release of human labor. In totality, this tends to increase customer satisfaction as a final goal of the developed system. (author)

  15. Simulation-optimization model for production planning in the blood supply chain.

    Science.gov (United States)

    Osorio, Andres F; Brailsford, Sally C; Smith, Honora K; Forero-Matiz, Sonia P; Camacho-Rodríguez, Bernardo A

    2017-12-01

    Production planning in the blood supply chain is a challenging task. Many complex factors such as uncertain supply and demand, blood group proportions, shelf life constraints and different collection and production methods have to be taken into account, and thus advanced methodologies are required for decision making. This paper presents an integrated simulation-optimization model to support both strategic and operational decisions in production planning. Discrete-event simulation is used to represent the flows through the supply chain, incorporating collection, production, storing and distribution. On the other hand, an integer linear optimization model running over a rolling planning horizon is used to support daily decisions, such as the required number of donors, collection methods and production planning. This approach is evaluated using real data from a blood center in Colombia. The results show that, using the proposed model, key indicators such as shortages, outdated units, donors required and cost are improved.

  16. Production planning and control of closed-loop supply chains

    NARCIS (Netherlands)

    K. Inderfurth (Karl); R.H. Teunter (Ruud)

    2001-01-01

    textabstractMore and more supply chains emerge that include a return flow of materials. Many original equipment manufacturers are nowadays engaged in the remanufacturing business. In many process industries, production defectives and by-products are reworked. These closed-loop supply chains deserve

  17. Non-timber forest products and forest stewardship plans

    Science.gov (United States)

    Becky Barlow; Tanner Filyaw; Sarah W. Workman

    2015-01-01

    To many woodland owners “harvesting” typically means the removal of timber from forests. In recent years many landowners have become aware of the role non-timber forest products (NTFPs) can play in supplemental management strategies to produce income while preserving other forest qualities. NTFPs are a diverse group of craft, culinary, and medicinal products that have...

  18. Plan now to make your retirement active, productive.

    Science.gov (United States)

    Schlepp, S

    1989-12-01

    In his book Planning to the Years Ahead, Lester I. Tenney, PhD, professor emeritus at Arizona State University, Tempe, links Abraham Maslow's hierarchy of needs to retirement planning. According to Maslow, economic and security needs can be achieved through a family environment (eg, food clothing, shelter), and social acceptance, self-worth, and self-satisfaction can be achieved from social interaction, work, or leisure activities. After the basic needs of food, clothing, and shelter have been achieved, people are able to move to the next level of achieving safety and security. The level of dependency that people have on satisfying these needs through work will determine how well they are at adapting to retirement. The more people depend on work alone, the harder will be the adjustment; people who are less dependent on work will find retirement easier to accept.

  19. Increasing Student Interest and Comprehension of Production Planning and Control and Operations Performance Measurement Concepts Using a Production Line Game

    Science.gov (United States)

    Cox, James F., III; Walker, Edward D., II

    2005-01-01

    Production planning and control (PPC) systems and operations performance measures are topics that students generally find both boring and difficult to understand. In the article, the authors present a production line game that they have found to be an effective tool to increase student interest in the topics as well as student comprehension. The…

  20. Summary of strategies for planning Productivity Improvement and Quality Enhancement (PIQE)

    Science.gov (United States)

    1986-01-01

    The Summary of NASA Strategies for Productivity Improvement and Quality Enhancement respond to NASA's eighth top goal: Establish NASA as a leader in the development and application of advanced technology and management practices which contribute to significant increases in both Agency and national productivity. The Strategies provide the framework for development of the agency-wide Productivity Improvement and Quality Enhancement (PIQE) Plans.

  1. Advance Planning of Form Properties in the Written Production of Single and Multiple Words

    Science.gov (United States)

    Damian, Markus F.; Stadthagen-Gonzalez, Hans

    2009-01-01

    Three experiments investigated the scope of advance planning in written production. Experiment 1 manipulated phonological factors in single word written production, and Experiments 2 and 3 did the same in the production of adjective-noun utterances. In all three experiments, effects on latencies were found which mirrored those previously…

  2. Production and Distribution Planning in District Heating Systems; Produktions- och distributionsplanering av fjaerrvaerme

    Energy Technology Data Exchange (ETDEWEB)

    Kvarnstroem, Johan; Dotzauer, Erik; Dahlquist, Erik

    2006-12-15

    To produce heat and power is costly. Therefore it is important for the district heating companies to plan and optimize the production. The aim with the present project is to find out how also the distribution of heat can be considered in the planning. The principal procedure is to first construct a prediction of the heat demand, and then, given the demand prediction, construct the production plan. Due to the complexity of the problem, the need for mathematical models is obvious. The report gives a survey introduction to production planning in district heating systems and presents a model for the purpose. The model is developed for one of the district heating systems in Stockholm owned by the energy company Fortum. Traditionally, models for production planning do not consider the distribution network. In such models, usually the methodology Mixed Integer Programming (MIP) is used. The report suggests how the distribution network can be modeled as a MIP; it shall be possible to link the network model to existing software that models the production plants as MIP. The model is developed in the programming language GAMS. Analysis and results are presented. The results show that the suggested plans vary depending on if the distribution network is considered or not. The report also suggests how a simple sensitivity analysis of the production plans can be performed. This is necessary since there are always uncertainties associated with weather- and load predictions.

  3. Study on environmental impact assessment index system of uranium production base construction plan

    International Nuclear Information System (INIS)

    Liu Xiaochao; Song Liquan

    2008-01-01

    The index system on planning environmental impact assessment of uranium mining base construction is discussed by using the hiberarchy method according to characteristics of uranium production and environmental protection object of planning assessment. The suggested index system is in favor of persistent exploitation of uranium resource and environmental protection in the uranium mining area, and can provide a reference for planning environmental impact assessment of uranium mining base construction in China. (authors)

  4. Engineering Environment for Production System Planning in Small and Medium Enterprises

    OpenAIRE

    Goerzig, David; Lucke, Dominik; Lenz, Juergen; Denner, Timo; Lickefett, Michael; Bauernhansl, Thomas

    2015-01-01

    Today, factories have to be adapted permanently in order to follow the developments towards fast changing customer demands and faster life cycles of products. Key aspects to cope with these developments are the reduction of the unit costs and the planning duration as well as the improvement of the planning quality. In order to overcome these challenges, digital tools can support all phases of factory and process planning. Most of them provide a wide range of functionalities, which require a l...

  5. Global Production Planning Process considering the Supply Risk of Overseas Manufacturing Sites

    Directory of Open Access Journals (Sweden)

    Hosang Jung

    2015-01-01

    Full Text Available Although global manufacturers can produce most of their final products in local plants, they need to source components or parts from desirable overseas manufacturing partners at low cost in order to fulfill customer orders. In this global manufacturing environment, capacity information for planning is usually imprecise owing to the various risks of overseas plants (e.g., foreign governments’ policies and labor stability. It is therefore not easy for decision-makers to generate a global production plan showing the production amounts at local plants and overseas manufacturing facilities operated by manufacturing partners. In this paper, we present a new global production planning process considering the supply risk of overseas manufacturing sites. First, local experts estimate the supply capacity of an overseas plant using their judgment to determine when the risk could occur and how large the risk impact would be. Next, we run a global production planning model with the estimated supply capacities. The proposed process systematically adopts the qualitative judgments of local experts in the global production planning process and thus can provide companies with a realistic global production plan. We demonstrate the applicability of the proposed process with a real world case.

  6. Decision Model for Planning and Scheduling of Seafood Product Considering Traceability

    Science.gov (United States)

    Agustin; Mawengkang, Herman; Mathelinea, Devy

    2018-01-01

    Due to the global challenges, it is necessary for an industrial company to integrate production scheduling and distribution planning, in order to be more efficient and to get more economics advantages. This paper presents seafood production planning and scheduling of a seafood manufacture company which produces simultaneously multi kind of seafood products, located at Aceh Province, Indonesia. The perishability nature of fish highly restricts its storage duration and delivery conditions. Traceability is a tracking requirement to check whether the quality of the product is satisfied. The production and distribution planning problem aims to meet customer demand subject to traceability of the seafood product and other restrictions. The problem is modeled as a mixed integer linear program, and then it is solved using neighborhood search approach.

  7. Stability measures for rolling schedules with applications to capacity expansion planning, master production scheduling, and lot sizing

    OpenAIRE

    Kimms, Alf

    1996-01-01

    This contribution discusses the measurement of (in-)stability of finite horizon production planning when done on a rolling horizon basis. As examples we review strategic capacity expansion planning, tactical master production schedulng, and operational capacitated lot sizing.

  8. Realizing block planning concepts in make-and-pack production using MILP modelling and SAP APO

    DEFF Research Database (Denmark)

    Günther, H.O.; Grunow, M.; Neuhaus, U.

    2006-01-01

    of a major producer of hair dyes as a case study. We present two different implementations of the block planning concept. One utilizes the Production Planning/Detailed Scheduling module of the SAP APO© software. The other approach is based on a mixed-integer linear programming formulation. In contrast...

  9. Learning Outcomes in Vocational Education: A Business Plan Development by Production-Based Learning Model Approach

    Science.gov (United States)

    Kusumaningrum, Indrati; Hidayat, Hendra; Ganefri; Anori, Sartika; Dewy, Mega Silfia

    2016-01-01

    This article describes the development of a business plan by using production-based learning approach. In addition, this development also aims to maximize learning outcomes in vocational education. Preliminary analysis of curriculum and learning and the needs of the market and society become the basic for business plan development. To produce a…

  10. Integrated production-distribution planning optimization models: A review in collaborative networks context

    Directory of Open Access Journals (Sweden)

    Beatriz Andres

    2017-01-01

    Full Text Available Researchers in the area of collaborative networks are more and more aware of proposing collaborative approaches to address planning processes, due to the advantages associated when enterprises perform integrated planning models. Collaborative production-distribution planning, among the supply network actors, is considered a proper mechanism to support enterprises on dealing with uncertainties and dynamicity associated to the current markets. Enterprises, and especially SMEs, should be able to overcome the continuous changes of the market by increasing their agility. Carrying out collaborative planning allows enterprises to enhance their readiness and agility for facing the market turbulences. However, SMEs have limited access when incorporating optimization tools to deal with collaborative planning, reducing their ability to respond to the competition. The problem to solve is to provide SMEs affordable solutions to support collaborative planning. In this regard, new optimisation algorithms are required in order to improve the collaboration within the supply network partners. As part of the H2020 Cloud Collaborative Manufacturing Networks (C2NET research project, this paper presents a study on integrated production and distribution plans. The main objective of the research is to identify gaps in current optimization models, proposed to address integrated planning, taking into account the requirements and needs of the industry. Thus, the needs of the companies belonging to the industrial pilots, defined in the C2NET project, are identified; analysing how these needs are covered by the optimization models proposed in the literature, to deal with the integrated production-distribution planning.

  11. Runtime Concepts of Hierarchical Software Components

    Czech Academy of Sciences Publication Activity Database

    Bureš, Tomáš; Hnětynka, P.; Plášil, František

    2007-01-01

    Roč. 8, special (2007), s. 454-463 ISSN 1525-9293 R&D Projects: GA AV ČR 1ET400300504 Institutional research plan: CEZ:AV0Z10300504 Keywords : component-based development * hierarchical components * connectors * controlers * runtime environment Subject RIV: JC - Computer Hardware ; Software

  12. MULTI-CRITERIA PROGRAMMING METHODS AND PRODUCTION PLAN OPTIMIZATION PROBLEM SOLVING IN METAL INDUSTRY

    OpenAIRE

    Tunjo Perić; Željko Mandić

    2017-01-01

    This paper presents the production plan optimization in the metal industry considered as a multi-criteria programming problem. We first provided the definition of the multi-criteria programming problem and classification of the multicriteria programming methods. Then we applied two multi-criteria programming methods (the STEM method and the PROMETHEE method) in solving a problem of multi-criteria optimization production plan in a company from the metal industry. The obtained resul...

  13. Study on DSM-based task planning of product cooperative development

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    The results of analyzing the managerial characteristics and complexity of product cooperative development suggest that task planning is an important aspect for process management of product cooperative development and the method for planning tasks should be able to model the dependency between tasks and iterations during the development process. In this paper, a DSM-based method and its corresponding optimization algorithms are developed. At first the coupled task sets and uncoupled task sets are identified...

  14. The APT program plan: Providing an assured tritium production capability

    International Nuclear Information System (INIS)

    Lisowski, P.W.; Anderson, J.L.; Bishop, W.P.; Boggs, B.; Hall, K.

    1996-01-01

    Tritium is a radioactive hydrogen isotope used in all U.S. nuclear weapons. Because the half-life of tritium is short, 12.3 yr, it must be periodically replenished. To provide a new source, the U.S. Department of Energy (DOE) is sponsoring conceptual design and engineering development and demonstration activities for a plant that will use a high-power proton linear accelerator to produce tritium and will go on-line no later than 2007. The APT project is in the process of completing the conceptual design for a tritium production plant. In addition, there are several important areas under engineering development and demonstration that will ensure an efficient, cost-effective plant design and provide an adequate margin of tritium production. Information provided from this work will be used by the DOE in its 1998 choice of production technology implementation

  15. Catalysis with hierarchical zeolites

    DEFF Research Database (Denmark)

    Holm, Martin Spangsberg; Taarning, Esben; Egeblad, Kresten

    2011-01-01

    Hierarchical (or mesoporous) zeolites have attracted significant attention during the first decade of the 21st century, and so far this interest continues to increase. There have already been several reviews giving detailed accounts of the developments emphasizing different aspects of this research...... topic. Until now, the main reason for developing hierarchical zeolites has been to achieve heterogeneous catalysts with improved performance but this particular facet has not yet been reviewed in detail. Thus, the present paper summaries and categorizes the catalytic studies utilizing hierarchical...... zeolites that have been reported hitherto. Prototypical examples from some of the different categories of catalytic reactions that have been studied using hierarchical zeolite catalysts are highlighted. This clearly illustrates the different ways that improved performance can be achieved with this family...

  16. Hierarchical Network Design

    DEFF Research Database (Denmark)

    Thomadsen, Tommy

    2005-01-01

    Communication networks are immensely important today, since both companies and individuals use numerous services that rely on them. This thesis considers the design of hierarchical (communication) networks. Hierarchical networks consist of layers of networks and are well-suited for coping...... with changing and increasing demands. Two-layer networks consist of one backbone network, which interconnects cluster networks. The clusters consist of nodes and links, which connect the nodes. One node in each cluster is a hub node, and the backbone interconnects the hub nodes of each cluster and thus...... the clusters. The design of hierarchical networks involves clustering of nodes, hub selection, and network design, i.e. selection of links and routing of ows. Hierarchical networks have been in use for decades, but integrated design of these networks has only been considered for very special types of networks...

  17. Micromechanics of hierarchical materials

    DEFF Research Database (Denmark)

    Mishnaevsky, Leon, Jr.

    2012-01-01

    A short overview of micromechanical models of hierarchical materials (hybrid composites, biomaterials, fractal materials, etc.) is given. Several examples of the modeling of strength and damage in hierarchical materials are summarized, among them, 3D FE model of hybrid composites...... with nanoengineered matrix, fiber bundle model of UD composites with hierarchically clustered fibers and 3D multilevel model of wood considered as a gradient, cellular material with layered composite cell walls. The main areas of research in micromechanics of hierarchical materials are identified, among them......, the investigations of the effects of load redistribution between reinforcing elements at different scale levels, of the possibilities to control different material properties and to ensure synergy of strengthening effects at different scale levels and using the nanoreinforcement effects. The main future directions...

  18. Programming with Hierarchical Maps

    DEFF Research Database (Denmark)

    Ørbæk, Peter

    This report desribes the hierarchical maps used as a central data structure in the Corundum framework. We describe its most prominent features, ague for its usefulness and briefly describe some of the software prototypes implemented using the technology....

  19. Introduction into Hierarchical Matrices

    KAUST Repository

    Litvinenko, Alexander

    2013-12-05

    Hierarchical matrices allow us to reduce computational storage and cost from cubic to almost linear. This technique can be applied for solving PDEs, integral equations, matrix equations and approximation of large covariance and precision matrices.

  20. Introduction into Hierarchical Matrices

    KAUST Repository

    Litvinenko, Alexander

    2013-01-01

    Hierarchical matrices allow us to reduce computational storage and cost from cubic to almost linear. This technique can be applied for solving PDEs, integral equations, matrix equations and approximation of large covariance and precision matrices.

  1. Slovenske elektrarne has fulfilled the plan of electric power production at 101 %

    International Nuclear Information System (INIS)

    Anon

    2004-01-01

    Slovenske elektrarne, a. s., produced in 2003 year the electric power in capacity 26,047.6 GWh, whereby they fulfilled business plan at 101 %. In compare with the last year it is a reduction in production by 1,397.3 GWh. The biggest share of production - till 68.6 % of overall production of the Slovenske elektrarne, was provided by nuclear sources. Nuclear power plants fulfilled business plan at 104 %, when Jaslovske Bohunice NPP has produced 11,625 GWh and Mochovce NPP 6,238 GWh. The share of other power plants on the electricity production is presented

  2. Improving food safety in the supply chain: Integrating traceability in production and distribution planning

    DEFF Research Database (Denmark)

    Grunow, Martin; Rong, Aiying; Akkerman, Renzo

    2008-01-01

    on production and distribution planning. Here, we develop a methodology for production and distribution planning in food supply chains which minimizes production and logistics costs and at the same time reduces food safety concerns, limits the size of potential recalls, and satisfies product quality...... with traceability from the viewpoint of information system development and technology development such as radio frequency identification (RFID) and DNA-based techniques. However, traceability and its implications for food safety are thus far not incorporated in the standard operations management literature...

  3. Capacity and production planning with carbon emission constraints

    DEFF Research Database (Denmark)

    Govindan, Kannan; Song, Shuang; Xu, Lei

    2017-01-01

    This paper builds a two-stage, stochastic model to study capacity expansion problem in logistics under cap-and-trade and carbon tax regulations. The optimal capacity expansion and production decisions are obtained, and the effects of carbon emission regulations on capacity expansion are studied....... Through analytical study and a real case numerical analysis, we find that the carbon tax exhibits different impacts on optimal capacity expansion decisions in low tax rate and high tax rate, and the volatility of capacity investment cost has a larger impact on optimal capacity expansion than...... that of production cost....

  4. 49 CFR 236.907 - Product Safety Plan (PSP).

    Science.gov (United States)

    2010-10-01

    ... addressed during the life cycle of the product, including maximum threshold limits for each hazard (for... accordance with other criteria if demonstrated to the satisfaction of the Associate Administrator for Safety... contractor employees and supervisors necessary to ensure the safe and proper installation, implementation...

  5. System Development of Estimated Figures of Volume Production Plan

    Science.gov (United States)

    Brazhnikov, Maksim A.; Khorina, Irina V.; Minina, Yulia I.; Kolyasnikova, Lyudmila V.; Streltsov, Aleksey V.

    2016-01-01

    The relevance of this problem is primarily determined by a necessity of improving production efficiency in conditions of innovative development of the economy and implementation of Import Substitution Program. The purpose of the article is development of set of criteria and procedures for the comparative assessment of alternative volume production…

  6. Tactical Production and Lot Size Planning with Lifetime Constraints

    DEFF Research Database (Denmark)

    Raiconi, Andrea; Pahl, Julia; Gentili, Monica

    2017-01-01

    In this work, we face a variant of the capacitated lot sizing problem. This is a classical problem addressing the issue of aggregating lot sizes for a finite number of discrete periodic demands that need to be satisfied, thus setting up production resources and eventually creating inventories...

  7. A Multiobjective Stochastic Production-Distribution Planning Problem in an Uncertain Environment Considering Risk and Workers Productivity

    Directory of Open Access Journals (Sweden)

    S. M. J. Mirzapour Al-e-Hashem

    2011-01-01

    Full Text Available A multi-objective two stage stochastic programming model is proposed to deal with a multi-period multi-product multi-site production-distribution planning problem for a midterm planning horizon. The presented model involves majority of supply chain cost parameters such as transportation cost, inventory holding cost, shortage cost, production cost. Moreover some respects as lead time, outsourcing, employment, dismissal, workers productivity and training are considered. Due to the uncertain nature of the supply chain, it is assumed that cost parameters and demand fluctuations are random variables and follow from a pre-defined probability distribution. To develop a robust stochastic model, an additional objective functions is added to the traditional production-distribution-planning problem. So, our multi-objective model includes (i the minimization of the expected total cost of supply chain, (ii the minimization of the variance of the total cost of supply chain and (iii the maximization of the workers productivity through training courses that could be held during the planning horizon. Then, the proposed model is solved applying a hybrid algorithm that is a combination of Monte Carlo sampling method, modified -constraint method and L-shaped method. Finally, a numerical example is solved to demonstrate the validity of the model as well as the efficiency of the hybrid algorithm.

  8. An integrated multi−period planning of the production and transportation of multiple petroleum products in a single pipeline system

    Directory of Open Access Journals (Sweden)

    Alberto Herrán

    2011-01-01

    Full Text Available A multiproduct pipeline provides an economic way to transport large volumes of refined petroleum products over long distances. In such a pipeline, different products are pumped back−to−back without any separation device between them. The sequence and lengths of such pumping runs must be carefully selected in order to meet market demands while minimizing pipeline operational costs and satisfying several constraints. The production planning and scheduling of the products at the refinery must also be synchronized with the transportation in order to avoid the usage of the system at some peak−hour time intervals. In this paper, we propose a multi−period mixed integer nonlinear programming (MINLP model for an optimal planning and scheduling of the production and transportation of multiple petroleum products from a refinery plant connected to several depots through a single pipeline system. The objective of this work is to generalize the mixed integer linear programming (MILP formulation proposed by Cafaro and Cerdá (2004, Computers and Chemical Engineering where only a single planning period was considered and the production planning and scheduling was not part of the decision process. Numerical examples show how the use of a single period model for a given time period may lead to infeasible solutions when it is used for the upcoming periods. These examples also show how integrating production planning with the transportation and the use of a multi−period model may result in a cost saving compared to using a single−period model for each period, independently.

  9. Optimization of the production plan and risk control in Third Qinshan Nuclear Power Co.,Ltd

    International Nuclear Information System (INIS)

    Zhou Jun

    2009-01-01

    Some optimized and improved measures have been taken in Third Qinshan Nuclear Power Co., Ltd. (TQNPC) to optimize the routine production plan management, strengthen the maintenance work risk analysis, and improve the plan execution capability. Which involve unified management of generation, refueling, periodic test and maintenance plans; simplifying the defect scale and reducing the intermediate link of defect treatment; intensifying the appraisal on plan execution and adopting star performance evaluation and merit rating measures. In this paper, the above-mentioned improvement and optimization are introduced comprehensively and systematically. (authors)

  10. Marketing plan for Pharmacare product line in the Moscow region Case Oriola-KD

    OpenAIRE

    Mashkilleyson, Peter

    2012-01-01

    The thesis was commissioned by Oriola-KD. It deals with a marketing plan for a product line called Pharmacare. The product line will be launched in 2012 in the Moscow region in the Russian Federation. The purpose of this thesis was to acquire useful information about the Moscow market for the target company and produce a marketing plan that they can implement. The research question was how to create an effective marketing plan and what it entails. The literary review consisted of the theo...

  11. Energy and Production Planning for Process Industry Supply Chains

    OpenAIRE

    Waldemarsson, Martin

    2012-01-01

    This thesis addresses industrial energy issues from a production economic perspective. During the past decade, the energy issue has become more important, partly due to rising energy prices in general, but also from a political pressure on environmental awareness concerning the problems with climate change. As a large user of energy the industry sector is most likely responsible for a lot of these problems. Things need to change and are most likely to do so considering current and assumed fut...

  12. Layout Optimization Model for the Production Planning of Precast Concrete Building Components

    Directory of Open Access Journals (Sweden)

    Dong Wang

    2018-05-01

    Full Text Available Precast concrete comprises the basic components of modular buildings. The efficiency of precast concrete building component production directly impacts the construction time and cost. In the processes of precast component production, mold setting has a significant influence on the production efficiency and cost, as well as reducing the resource consumption. However, the development of mold setting plans is left to the experience of production staff, with outcomes dependent on the quality of human skill and experience available. This can result in sub-optimal production efficiencies and resource wastage. Accordingly, in order to improve the efficiency of precast component production, this paper proposes an optimization model able to maximize the average utilization rate of pallets used during the molding process. The constraints considered were the order demand, the size of the pallet, layout methods, and the positional relationship of components. A heuristic algorithm was used to identify optimization solutions provided by the model. Through empirical analysis, and as exemplified in the case study, this research is significant in offering a prefabrication production planning model which improves pallet utilization rates, shortens component production time, reduces production costs, and improves the resource utilization. The results clearly demonstrate that the proposed method can facilitate the precast production plan providing strong practical implications for production planners.

  13. PLAN 2003. Costs for management of the radioactive waste products from nuclear power production

    International Nuclear Information System (INIS)

    2003-06-01

    The companies that own nuclear power plants in Sweden are responsible for adopting measures needed to manage and dispose of spent nuclear fuel and radioactive waste from the Swedish nuclear power reactors in a safe manner. The so-called Financing Act (1992:1537) is linked to this responsibility and prescribes that a reactor owner, in consultation with other reactor owners, shall calculate the cost for management and disposal of the spent fuel and radioactive waste and for decommissioning and dismantling of the reactor plant. The reactor owner shall annually submit to the regulatory authority the cost data that are required for calculation of the fees to be imposed on electricity production during the ensuing year and of the guarantees that must be given as security for costs not covered by paid-in fees. The reactor owners have jointly commissioned SKB to calculate and compile these costs. This report presents a calculation of the costs for implementing all of these measures. The cost calculations are based on the plan for management and disposal of the radioactive waste that has been prepared by SKB and is described in this report. The following facilities and systems are in operation: Transportation system for radioactive waste products; Central interim storage facility for spent nuclear fuel, CLAB; Final repository for radioactive operational waste, SFR 1. Plans also exist for: Canister factory and encapsulation plant for spent nuclear fuel; Deep repository for spent nuclear fuel; Final repository for long-lived low- and intermediate-level waste; Final repository for decommissioning waste. The cost calculations also include costs for research, development and demonstration, as well as for decommissioning and dismantling the reactor plants. This report is based on the proposed strategy for the activities which is presented in SKB's RD and D-Programme 2001 and in the supplementary account to RD and D-Programme 98 which SKB submitted to the regulatory authority. The

  14. Hanford Immobilized Low-Activity Waste Product Acceptance Test Plan

    International Nuclear Information System (INIS)

    Peeler, D.

    1999-01-01

    'The Hanford Site has been used to produce nuclear materials for the U.S. Department of Energy (DOE) and its predecessors. A large inventory of radioactive and mixed waste, largely generated during Pu production, exists in 177 underground single- and double-shell tanks. These wastes are to be retrieved and separated into low-activity waste (LAW) and high-level waste (HLW) fractions. The DOE is proceeding with an approach to privatize the treatment and immobilization of Handord''s LAW and HLW.'

  15. Hanford Immobilized Low-Activity Waste Product Acceptance Test Plan

    Energy Technology Data Exchange (ETDEWEB)

    Peeler, D.

    1999-06-22

    'The Hanford Site has been used to produce nuclear materials for the U.S. Department of Energy (DOE) and its predecessors. A large inventory of radioactive and mixed waste, largely generated during Pu production, exists in 177 underground single- and double-shell tanks. These wastes are to be retrieved and separated into low-activity waste (LAW) and high-level waste (HLW) fractions. The DOE is proceeding with an approach to privatize the treatment and immobilization of Handord''s LAW and HLW.'

  16. Hierarchical decision modeling essays in honor of Dundar F. Kocaoglu

    CERN Document Server

    2016-01-01

    This volume, developed in honor of Dr. Dundar F. Kocaoglu, aims to demonstrate the applications of the Hierarchical Decision Model (HDM) in different sectors and its capacity in decision analysis. It is comprised of essays from noted scholars, academics and researchers of engineering and technology management around the world. This book is organized into four parts: Technology Assessment, Strategic Planning, National Technology Planning and Decision Making Tools. Dr. Dundar F. Kocaoglu is one of the pioneers of multiple decision models using hierarchies, and creator of the HDM in decision analysis. HDM is a mission-oriented method for evaluation and/or selection among alternatives. A wide range of alternatives can be considered, including but not limited to, different technologies, projects, markets, jobs, products, cities to live in, houses to buy, apartments to rent, and schools to attend. Dr. Kocaoglu’s approach has been adopted for decision problems in many industrial sectors, including electronics rese...

  17. Some effects of integrated production planning in large-scale kitchens

    DEFF Research Database (Denmark)

    Engelund, Eva Høy; Friis, Alan; Jacobsen, Peter

    2005-01-01

    Integrated production planning in large-scale kitchens proves advantageous for increasing the overall quality of the food produced and the flexibility in terms of a diverse food supply. The aim is to increase the flexibility and the variability in the production as well as the focus on freshness ...

  18. 78 FR 26301 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; Consumer Products and...

    Science.gov (United States)

    2013-05-06

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R05-OAR-2010-0394; EPA-R05-OAR-2012-0786; FRL-9786-1] Approval and Promulgation of Air Quality Implementation Plans; Illinois; Consumer Products and... consumer products categories into the State's SIP. Finally, EPA is proposing to approve language to clarify...

  19. A Label Correcting Algorithm for Partial Disassembly Sequences in the Production Planning for End-of-Life Products

    Directory of Open Access Journals (Sweden)

    Pei-Fang (Jennifer Tsai

    2012-01-01

    Full Text Available Remanufacturing of used products has become a strategic issue for cost-sensitive businesses. Due to the nature of uncertain supply of end-of-life (EoL products, the reverse logistic can only be sustainable with a dynamic production planning for disassembly process. This research investigates the sequencing of disassembly operations as a single-period partial disassembly optimization (SPPDO problem to minimize total disassembly cost. AND/OR graph representation is used to include all disassembly sequences of a returned product. A label correcting algorithm is proposed to find an optimal partial disassembly plan if a specific reusable subpart is retrieved from the original return. Then, a heuristic procedure that utilizes this polynomial-time algorithm is presented to solve the SPPDO problem. Numerical examples are used to demonstrate the effectiveness of this solution procedure.

  20. Hierarchical Nanoceramics for Industrial Process Sensors

    Energy Technology Data Exchange (ETDEWEB)

    Ruud, James, A.; Brosnan, Kristen, H.; Striker, Todd; Ramaswamy, Vidya; Aceto, Steven, C.; Gao, Yan; Willson, Patrick, D.; Manoharan, Mohan; Armstrong, Eric, N., Wachsman, Eric, D.; Kao, Chi-Chang

    2011-07-15

    This project developed a robust, tunable, hierarchical nanoceramics materials platform for industrial process sensors in harsh-environments. Control of material structure at multiple length scales from nano to macro increased the sensing response of the materials to combustion gases. These materials operated at relatively high temperatures, enabling detection close to the source of combustion. It is anticipated that these materials can form the basis for a new class of sensors enabling widespread use of efficient combustion processes with closed loop feedback control in the energy-intensive industries. The first phase of the project focused on materials selection and process development, leading to hierarchical nanoceramics that were evaluated for sensing performance. The second phase focused on optimizing the materials processes and microstructures, followed by validation of performance of a prototype sensor in a laboratory combustion environment. The objectives of this project were achieved by: (1) synthesizing and optimizing hierarchical nanostructures; (2) synthesizing and optimizing sensing nanomaterials; (3) integrating sensing functionality into hierarchical nanostructures; (4) demonstrating material performance in a sensing element; and (5) validating material performance in a simulated service environment. The project developed hierarchical nanoceramic electrodes for mixed potential zirconia gas sensors with increased surface area and demonstrated tailored electrocatalytic activity operable at high temperatures enabling detection of products of combustion such as NOx close to the source of combustion. Methods were developed for synthesis of hierarchical nanostructures with high, stable surface area, integrated catalytic functionality within the structures for gas sensing, and demonstrated materials performance in harsh lab and combustion gas environments.

  1. Optimized production planning model for a multi-plant cultivation system under uncertainty

    Science.gov (United States)

    Ke, Shunkui; Guo, Doudou; Niu, Qingliang; Huang, Danfeng

    2015-02-01

    An inexact multi-constraint programming model under uncertainty was developed by incorporating a production plan algorithm into the crop production optimization framework under the multi-plant collaborative cultivation system. In the production plan, orders from the customers are assigned to a suitable plant under the constraints of plant capabilities and uncertainty parameters to maximize profit and achieve customer satisfaction. The developed model and solution method were applied to a case study of a multi-plant collaborative cultivation system to verify its applicability. As determined in the case analysis involving different orders from customers, the period of plant production planning and the interval between orders can significantly affect system benefits. Through the analysis of uncertain parameters, reliable and practical decisions can be generated using the suggested model of a multi-plant collaborative cultivation system.

  2. The importance of work or productive activity in life care planning and case management

    Science.gov (United States)

    Reid, Christine; Riddick-Grisham, Susan

    2015-01-01

    Abstract INTRODUCTION: The importance of work or productive activity for the well-being, community integration, and quality of life of people living with disabilities is addressed, with implications for life care planning and case management. BACKGROUND: The role of work or productive activity in our society, and consequences of deprivation if rehabilitation services do not address vocational effects of disabilities, is explored. A continuum of productivity options is introduced; types of vocational rehabilitation assessment processes and interventions are described. PURPOSE: The role of vocational rehabilitation services in life care planning and case management is discussed, focusing on quality of life for people living with disabilities. CONCLUSION: Rehabilitation and health care professionals should understand the importance of work or other productive activity, and support the development of appropriate plans to address those needs among people who have disabilities. PMID:26409330

  3. The importance of work or productive activity in life care planning and case management.

    Science.gov (United States)

    Reid, Christine; Riddick-Grisham, Susan

    2015-01-01

    The importance of work or productive activity for the well-being, community integration, and quality of life of people living with disabilities is addressed, with implications for life care planning and case management. The role of work or productive activity in our society, and consequences of deprivation if rehabilitation services do not address vocational effects of disabilities, is explored. A continuum of productivity options is introduced; types of vocational rehabilitation assessment processes and interventions are described. The role of vocational rehabilitation services in life care planning and case management is discussed, focusing on quality of life for people living with disabilities. Rehabilitation and health care professionals should understand the importance of work or other productive activity, and support the development of appropriate plans to address those needs among people who have disabilities.

  4. Indian gas field development plan aims for quick production

    International Nuclear Information System (INIS)

    Banerjee, N.

    1992-01-01

    The development of a new oil or gas field involves construction of various downstream facilities such as field flow lines, trunk lines, oil and gas collecting and processing stations, and transportation to refineries and consuming centers. This paper reports that it is essential that these facilities be built on a schedule that allows the products to be transported and processed as early as possible. Unless such an approach is initiated, the wells producing crude oil or natural gas will need to be shut-in in the absence of the other relative facilities. For quick returns on the investments, a realistic program and careful evaluation of the schedule is needed to ensure that early commissioning of the fields is possible

  5. Parallel hierarchical radiosity rendering

    Energy Technology Data Exchange (ETDEWEB)

    Carter, Michael [Iowa State Univ., Ames, IA (United States)

    1993-07-01

    In this dissertation, the step-by-step development of a scalable parallel hierarchical radiosity renderer is documented. First, a new look is taken at the traditional radiosity equation, and a new form is presented in which the matrix of linear system coefficients is transformed into a symmetric matrix, thereby simplifying the problem and enabling a new solution technique to be applied. Next, the state-of-the-art hierarchical radiosity methods are examined for their suitability to parallel implementation, and scalability. Significant enhancements are also discovered which both improve their theoretical foundations and improve the images they generate. The resultant hierarchical radiosity algorithm is then examined for sources of parallelism, and for an architectural mapping. Several architectural mappings are discussed. A few key algorithmic changes are suggested during the process of making the algorithm parallel. Next, the performance, efficiency, and scalability of the algorithm are analyzed. The dissertation closes with a discussion of several ideas which have the potential to further enhance the hierarchical radiosity method, or provide an entirely new forum for the application of hierarchical methods.

  6. The Effects of Pre-Task Planning and On-line Planning on Fluency, Complexity, and Accuracy in L2 Monologic Oral Production.

    Science.gov (United States)

    Yuan, Fangyuan; Ellis, Rod

    2003-01-01

    Investigated the effects of both pre-task and on-line planning on second language (L2) oral production. Results show that pre-task planning enhances grammatical complexity while on-line planning positively influences accuracy and grammatical complexity. Pre-task planners also produced more fluent and lexically varied language than the on-line…

  7. PLAN 2003. Costs for management of the radioactive waste products from nuclear power production

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-06-01

    The companies that own nuclear power plants in Sweden are responsible for adopting measures needed to manage and dispose of spent nuclear fuel and radioactive waste from the Swedish nuclear power reactors in a safe manner. The so-called Financing Act (1992:1537) is linked to this responsibility and prescribes that a reactor owner, in consultation with other reactor owners, shall calculate the cost for management and disposal of the spent fuel and radioactive waste and for decommissioning and dismantling of the reactor plant. The reactor owner shall annually submit to the regulatory authority the cost data that are required for calculation of the fees to be imposed on electricity production during the ensuing year and of the guarantees that must be given as security for costs not covered by paid-in fees. The reactor owners have jointly commissioned SKB to calculate and compile these costs. This report presents a calculation of the costs for implementing all of these measures. The cost calculations are based on the plan for management and disposal of the radioactive waste that has been prepared by SKB and is described in this report. The following facilities and systems are in operation: Transportation system for radioactive waste products; Central interim storage facility for spent nuclear fuel, CLAB; Final repository for radioactive operational waste, SFR 1. Plans also exist for: Canister factory and encapsulation plant for spent nuclear fuel; Deep repository for spent nuclear fuel; Final repository for long-lived low- and intermediate-level waste; Final repository for decommissioning waste. The cost calculations also include costs for research, development and demonstration, as well as for decommissioning and dismantling the reactor plants. This report is based on the proposed strategy for the activities which is presented in SKB's RD and D-Programme 2001 and in the supplementary account to RD and D-Programme 98 which SKB submitted to the regulatory authority

  8. Segurança e produção: um modelo para o planejamento e controle integrado Safety and production: an integrated planning and control model

    Directory of Open Access Journals (Sweden)

    Tarcisio A. Saurin

    2002-01-01

    Full Text Available Este artigo apresenta um modelo de planejamento e controle da segurança no trabalho (PCS integrado ao processo de planejamento e controle da produção (PCP. O modelo foi desenvolvido por meio de dois estudos empíricos em obras industriais, adotando-se a pesquisa ação como estratégia de pesquisa. Os requisitos de segurança são integrados ao PCP em três níveis hierárquicos deste processo. No nível de longo prazo, o planejamento da segurança é configurado pelo desenvolvimento de análises preliminares de risco dos processos construtivos. A atualização e detalhamento da implantação destes planos é então feita por meio de sua integração aos níveis de médio e curto prazo do PCP.This paper presents a safety planning and control model (SPC that has been integrated to the production planning and control process. The model was developed through two action research empirical studies in industrial construction projects. Safety requirements are integrated into three hierarchical levels of planning and control process. At the long-term level, safety planning is featured by preliminary hazard analysis of construction processes. These plans are updated and detailed through its integration into both medium-term and short-term planning levels.

  9. Neutrosophic Hierarchical Clustering Algoritms

    Directory of Open Access Journals (Sweden)

    Rıdvan Şahin

    2014-03-01

    Full Text Available Interval neutrosophic set (INS is a generalization of interval valued intuitionistic fuzzy set (IVIFS, whose the membership and non-membership values of elements consist of fuzzy range, while single valued neutrosophic set (SVNS is regarded as extension of intuitionistic fuzzy set (IFS. In this paper, we extend the hierarchical clustering techniques proposed for IFSs and IVIFSs to SVNSs and INSs respectively. Based on the traditional hierarchical clustering procedure, the single valued neutrosophic aggregation operator, and the basic distance measures between SVNSs, we define a single valued neutrosophic hierarchical clustering algorithm for clustering SVNSs. Then we extend the algorithm to classify an interval neutrosophic data. Finally, we present some numerical examples in order to show the effectiveness and availability of the developed clustering algorithms.

  10. Decomposition of the Strategic Plan for Restructuring a Machine-Building Enterprise in View of Continuity of the Plans for Adjacent Periods

    Directory of Open Access Journals (Sweden)

    Kozyr-Chepurna Mariia A.

    2017-09-01

    Full Text Available The aim of the article is to practically approve the authors’ multi-level hierarchical approach to the strategic planning of industrial enterprise restructuring using the example of solving the problem of disaggregating the strategic plan for restructuring a machine-building enterprise of the electrical industry providing for organization of production of railroad freight cars at the enterprise. Besides, there demonstrated the effectiveness of the mechanisms of coordinating the plans for adjacent hierarchical and time periods included in the corresponding mathematical support. In the course of the practical approval, different variants of formulating the problem of decomposing the strategic plan into plans of lower hierarchical levels differing in terms of coordination of the plans of adjacent hierarchical levels and adjacent planning periods are considered, and the solutions of corresponding optimal planning problems are analyzed. It is shown that the developed methodological approach, which is based on the methods of statistical optimization, demonstrates quite satisfactory performance characteristics in solving the problem of coordinating the plans of adjacent time periods in the mode of sliding planning in the process of decomposition of the strategic plan into lower-level plans.

  11. Applied Railway Optimization in Production Planning at DSB-S-tog - Tasks, Tools and Challenges

    DEFF Research Database (Denmark)

    Clausen, Jens

    2007-01-01

    these conflicting goals. S-tog has therefore on the strategic level decided to use software with optimization capabilities in the planning processes. We describe the current status for each activity using optimization or simulation as a tool: Timetable evaluation, rolling stock planning, and crew scheduling...... to the customers, and has concurrently been met with demands for higher efficiency in the daily operation. The plans of timetable, rolling stock and crew must hence allow for a high level of customer service, be efficient, and be robust against disturbances of operations. It is a highly non-trivial task to meet....... In addition we describe on-going efforts in using mathematical models in activities such as timetable design and work-force planning. We also identify some organizatorial key factors, which have paved the way for extended use of optimization methods in railway production planning....

  12. Stochastic multi-period multi-product multi-objective Aggregate Production Planning model in multi-echelon supply chain

    Directory of Open Access Journals (Sweden)

    Kaveh Khalili-Damghani

    2017-07-01

    Full Text Available In this paper a multi-period multi-product multi-objective aggregate production planning (APP model is proposed for an uncertain multi-echelon supply chain considering financial risk, customer satisfaction, and human resource training. Three conflictive objective functions and several sets of real constraints are considered concurrently in the proposed APP model. Some parameters of the proposed model are assumed to be uncertain and handled through a two-stage stochastic programming (TSSP approach. The proposed TSSP is solved using three multi-objective solution procedures, i.e., the goal attainment technique, the modified ε-constraint method, and STEM method. The whole procedure is applied in an automotive resin and oil supply chain as a real case study wherein the efficacy and applicability of the proposed approaches are illustrated in comparison with existing experimental production planning method.

  13. A New Extended MILP MRP Approach to Production Planning and Its Application in the Jewelry Industry

    Directory of Open Access Journals (Sweden)

    Erhan Yazıcı

    2016-01-01

    Full Text Available It is important to manage reverse material flows such as recycling, reusing, and remanufacturing in a production environment. This paper addresses a production planning problem which involves reusing of scrap and recycling of waste that occur in the various stages of the production process and remanufacturing/recycling of returns in a closed-loop supply chain environment. An extended material requirement planning (MRP is proposed as a mixed integer linear programming (MILP model which includes—beside forward—these reverse material flows. The proposed model is developed for the jewelry industry in Turkey, which uses gold as the primary resource of production. The aim is to manage these reverse material flows as a part of production planning to utilize resources. Considering the mostly unpredictable nature of reverse material flows, the proposed model is likewise transformed into a fuzzy model to provide a better review of production plan for the decision maker. The suggested model is examined through a case study to test the applicability and efficiency.

  14. A Two Stage Solution Procedure for Production Planning System with Advance Demand Information

    Science.gov (United States)

    Ueno, Nobuyuki; Kadomoto, Kiyotaka; Hasuike, Takashi; Okuhara, Koji

    We model for ‘Naiji System’ which is a unique corporation technique between a manufacturer and suppliers in Japan. We propose a two stage solution procedure for a production planning problem with advance demand information, which is called ‘Naiji’. Under demand uncertainty, this model is formulated as a nonlinear stochastic programming problem which minimizes the sum of production cost and inventory holding cost subject to a probabilistic constraint and some linear production constraints. By the convexity and the special structure of correlation matrix in the problem where inventory for different periods is not independent, we propose a solution procedure with two stages which are named Mass Customization Production Planning & Management System (MCPS) and Variable Mesh Neighborhood Search (VMNS) based on meta-heuristics. It is shown that the proposed solution procedure is available to get a near optimal solution efficiently and practical for making a good master production schedule in the suppliers.

  15. The key to successful management of STS operations: An integrated production planning system

    Science.gov (United States)

    Johnson, W. A.; Thomasen, C. T.

    1985-01-01

    Space Transportation System operations managers are being confronted with a unique set of challenges as a result of increasing flight rates, the demand for flight manifest/production schedule flexibility and an emphasis on continued cost reduction. These challenges have created the need for an integrated production planning system that provides managers with the capability to plan, schedule, status and account for an orderly flow of products and services across a large, multi-discipline organization. With increased visibility into the end-to-end production flow for individual and parallel missions in process, managers can assess the integrated impact of changes, identify and measure the interrelationships of resource, schedule, and technical performance requirements and prioritize productivity enhancements.

  16. The path to glory is paved with hierarchy: When hierarchical differentiation increases group effectiveness.

    NARCIS (Netherlands)

    Ronay, R.D.; Greenaway, K; Anicich, E.M; Galinsky, A.D.

    2012-01-01

    Two experiments examined the psychological and biological antecedents of hierarchical differentiation and the resulting consequences for productivity and conflict within small groups. In Experiment 1, which used a priming manipulation, hierarchically differentiated groups (i.e., groups comprising 1

  17. Stochastic Optimization in The Power Management of Bottled Water Production Planning

    Science.gov (United States)

    Antoro, Budi; Nababan, Esther; Mawengkang, Herman

    2018-01-01

    This paper review a model developed to minimize production costs on bottled water production planning through stochastic optimization. As we know, that planning a management means to achieve the goal that have been applied, since each management level in the organization need a planning activities. The built models is a two-stage stochastic models that aims to minimize the cost on production of bottled water by observing that during the production process, neither interfernce nor vice versa occurs. The models were develop to minimaze production cost, assuming the availability of packing raw materials used considered to meet for each kind of bottles. The minimum cost for each kind production of bottled water are expressed in the expectation of each production with a scenario probability. The probability of uncertainly is a representation of the number of productions and the timing of power supply interruption. This is to ensure that the number of interruption that occur does not exceed the limit of the contract agreement that has been made by the company with power suppliers.

  18. Hierarchical wave functions revisited

    International Nuclear Information System (INIS)

    Li Dingping.

    1997-11-01

    We study the hierarchical wave functions on a sphere and on a torus. We simplify some wave functions on a sphere or a torus using the analytic properties of wave functions. The open question, the construction of the wave function for quasi electron excitation on a torus, is also solved in this paper. (author)

  19. Hierarchical Porous Structures

    Energy Technology Data Exchange (ETDEWEB)

    Grote, Christopher John [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2016-06-07

    Materials Design is often at the forefront of technological innovation. While there has always been a push to generate increasingly low density materials, such as aero or hydrogels, more recently the idea of bicontinuous structures has gone more into play. This review will cover some of the methods and applications for generating both porous, and hierarchically porous structures.

  20. The Hierarchical Perspective

    Directory of Open Access Journals (Sweden)

    Daniel Sofron

    2015-05-01

    Full Text Available This paper is focused on the hierarchical perspective, one of the methods for representing space that was used before the discovery of the Renaissance linear perspective. The hierarchical perspective has a more or less pronounced scientific character and its study offers us a clear image of the way the representatives of the cultures that developed it used to perceive the sensitive reality. This type of perspective is an original method of representing three-dimensional space on a flat surface, which characterises the art of Ancient Egypt and much of the art of the Middle Ages, being identified in the Eastern European Byzantine art, as well as in the Western European Pre-Romanesque and Romanesque art. At the same time, the hierarchical perspective is also present in naive painting and infantile drawing. Reminiscences of this method can be recognised also in the works of some precursors of the Italian Renaissance. The hierarchical perspective can be viewed as a subjective ranking criterion, according to which the elements are visually represented by taking into account their relevance within the image while perception is ignored. This paper aims to show how the main objective of the artists of those times was not to faithfully represent the objective reality, but rather to emphasize the essence of the world and its perennial aspects. This may represent a possible explanation for the refusal of perspective in the Egyptian, Romanesque and Byzantine painting, characterised by a marked two-dimensionality.

  1. MULTI-CRITERIA PROGRAMMING METHODS AND PRODUCTION PLAN OPTIMIZATION PROBLEM SOLVING IN METAL INDUSTRY

    Directory of Open Access Journals (Sweden)

    Tunjo Perić

    2017-09-01

    Full Text Available This paper presents the production plan optimization in the metal industry considered as a multi-criteria programming problem. We first provided the definition of the multi-criteria programming problem and classification of the multicriteria programming methods. Then we applied two multi-criteria programming methods (the STEM method and the PROMETHEE method in solving a problem of multi-criteria optimization production plan in a company from the metal industry. The obtained results indicate a high efficiency of the applied methods in solving the problem.

  2. Robust Production Planning in Fashion Apparel Industry under Demand Uncertainty via Conditional Value at Risk

    Directory of Open Access Journals (Sweden)

    Abderrahim Ait-Alla

    2014-01-01

    Full Text Available This paper presents a mathematical model for robust production planning. The model helps fashion apparel suppliers in making decisions concerning allocation of production orders to different production plants characterized by different lead times and production costs, and in proper time scheduling and sequencing of these production orders. The model aims at optimizing these decisions concerning objectives of minimal production costs and minimal tardiness. It considers several factors such as the stochastic nature of customer demand, differences in production and transport costs and transport times between production plants in different regions. Finally, the model is applied to a case study. The results of numerical computations are presented. The implications of the model results on different fashion related product types and delivery strategies, as well as the model’s limitations and potentials for expansion, are discussed. Results indicate that the production planning model using conditional value at risk (CVaR as the risk measure performs robustly and provides flexibility in decision analysis between different scenarios.

  3. Practical application of game theory based production flow planning method in virtual manufacturing networks

    Science.gov (United States)

    Olender, M.; Krenczyk, D.

    2016-08-01

    Modern enterprises have to react quickly to dynamic changes in the market, due to changing customer requirements and expectations. One of the key area of production management, that must continuously evolve by searching for new methods and tools for increasing the efficiency of manufacturing systems is the area of production flow planning and control. These aspects are closely connected with the ability to implement the concept of Virtual Enterprises (VE) and Virtual Manufacturing Network (VMN) in which integrated infrastructure of flexible resources are created. In the proposed approach, the players role perform the objects associated with the objective functions, allowing to solve the multiobjective production flow planning problems based on the game theory, which is based on the theory of the strategic situation. For defined production system and production order models ways of solving the problem of production route planning in VMN on computational examples for different variants of production flow is presented. Possible decision strategy to use together with an analysis of calculation results is shown.

  4. Advance Planning, Programming and Production Control as key Activities Now the Environmental Education

    Directory of Open Access Journals (Sweden)

    Geraldo Cardoso de Oliveira Neto

    2015-06-01

    Full Text Available This work addresses the evolution of Planning, Programming and Control of Production (PPCP as essential activities of the company towards the insertion of environmental education. The approach is based on an exploratory research and a critical bibliographic revision. Two main objectives were established: i a new way of production organization, by considering cleaner production from company utilities to production capacity, technology and outsourcing and ii infrastructure changes related to market attendance and environmental education dissemination. Needs that arise can be grouped as follows: utilities adequacy, cleaner technologies and ecochains implementation; instruction and dissemination of environmental education; and necessity of the adoption of new paradigms.

  5. Hierarchical machining materials and their performance

    DEFF Research Database (Denmark)

    Sidorenko, Daria; Loginov, Pavel; Levashov, Evgeny

    2016-01-01

    as nanoparticles in the binder, or polycrystalline, aggregate-like reinforcements, also at several scale levels). Such materials can ensure better productivity, efficiency, and lower costs of drilling, cutting, grinding, and other technological processes. This article reviews the main groups of hierarchical...

  6. Demand planning approaches employed by clothing industry stakeholders in Gauteng, South Africa

    Directory of Open Access Journals (Sweden)

    Ntombizodwa J. Matsoma

    2017-10-01

    Full Text Available Background: The decline in the productivity of the South African clothing industry was attributed to changing trends in the number of clothing production organisations, which together with a decline in manufacturing output and a fluctuation in employment had all contributed to complexities in demand planning. Purpose: This article investigates demand planning approaches in the clothing industry in Gauteng. Method: A descriptive study was conducted based on a structured questionnaire. Findings: The results revealed that both hierarchical and optimal approaches should be considered in clothing manufacturing. Managerial implications: In order to improve demand planning practices in the clothing industry, managers are recommended to apply hierarchical and optimal demand planning approaches, which might bring about improvements to demand planning in the Gauteng clothing industry. Conclusion: It is recommended that clothing manufacturers consider the types of product offering before making decisions about adopting the hierarchical or optimal demand planning approaches. When planning for basic clothes, manufacturers should consider a hierarchical demand planning approach, whereas the optimal demand planning approach is recommended for fashion clothes.

  7. Product Plan of New Generation System Camera "OLYMPUS PEN E-P1"

    Science.gov (United States)

    Ogawa, Haruo

    "OLYMPUS PEN E-P1", which is new generation system camera, is the first product of Olympus which is new standard "Micro Four-thirds System" for high-resolution mirror-less cameras. It continues good sales by the concept of "small and stylish design, easy operation and SLR image quality" since release on July 3, 2009. On the other hand, the half-size film camera "OLYMPUS PEN" was popular by the concept "small and stylish design and original mechanism" since the first product in 1959 and recorded sale number more than 17 million with 17 models. By the 50th anniversary topic and emotional value of the Olympus pen, Olympus pen E-P1 became big sales. I would like to explain the way of thinking of the product plan that included not only the simple functional value but also emotional value on planning the first product of "Micro Four-thirds System".

  8. Hierarchical Control for Smart Grids

    DEFF Research Database (Denmark)

    Trangbæk, K; Bendtsen, Jan Dimon; Stoustrup, Jakob

    2011-01-01

    of autonomous consumers. The control system is tasked with balancing electric power production and consumption within the smart grid, and makes active use of the flexibility of a large number of power producing and/or power consuming units. The objective is to accommodate the load variation on the grid, arising......This paper deals with hierarchical model predictive control (MPC) of smart grid systems. The design consists of a high level MPC controller, a second level of so-called aggregators, which reduces the computational and communication-related load on the high-level control, and a lower level...... on one hand from varying consumption, and on the other hand by natural variations in power production e.g. from wind turbines. The high-level MPC problem is solved using quadratic optimisation, while the aggregator level can either involve quadratic optimisation or simple sorting-based min-max solutions...

  9. Case study of information product for strategy research, planning research, and policy research

    International Nuclear Information System (INIS)

    Yuan Yujun; Zou Lin; Liu Qun; Wang Yongping

    2010-01-01

    Soft science research is significant and can directly support the decision-making and development. The strategy research, planning research, and policy research each play an important role in soft science research. As the National Strategy of Informatization being implemented and advanced, some progress are made and some special information tools are produced in the process of strengthening the development research with information technologies. At first, the article introduced some cases of information products application, such as the domestic and overseas information products for energy strategy research and planning research and policy research, the governmental management information system for planning and investment, examination and approval and permission system for the planning of the land for construction, China agriculture decision support system and so on, and also gave a brief analysis on the theories and methods, main functions and application status. And then, with a analysis on the features of the works of development planning of China National Nuclear Corporation (CNNC) development, this article gave some suggestions on how to strengthen the development of information system for the development planning of the CNNC. (authors)

  10. Hierarchical control system of advanced robot manipulator

    International Nuclear Information System (INIS)

    Oomichi, Takeo; Okino, Akihisa; Nishihara, Masatoshi; Sakamoto, Taizou; Matsuda, Koichi; Ohnishi, Ken

    1990-01-01

    We introduce a double arm with 4-finger's manipulator system which process the large volume of information at high speed. This is under research/development many type of works in the harsh condition. Namely, hierarchization of instruction unit in which motion control system as real time processing unit, and task planning unit as non-real time processing unit, interface with operation through the task planning unit has been made. Also, high speed processing of large volume information has been realized by decentralizing the motion control unit by function, hierarchizing the high speed processing unit, and developing high speed transmission, IC which does not depend on computer OS to avoid the delay in transmission. (author)

  11. Integrate Product Planning Process of OKP Companies in the Cloud Manufacturing Environment

    OpenAIRE

    Zheng , Pai; Xu , Xun; Xie , Sheng ,

    2015-01-01

    Part 8: Cloud-Based Manufacturing; International audience; In today’s competitive market, OKP companies operate in the “engineer-to-order” business mode, whereby analysing the “voice of customer” promptly and accurately in the early design stage determines the success of product development. However, OKP companies have limited resources. They may not be able to afford the cost of the complicated Quality Function Deployment (QFD) product planning process, nor can they obtain abundant CRs infor...

  12. Enhanced catalytic performance for light-olefins production from chloromethane over hierarchical porous ZSM-5 zeolite synthesized by a growth-inhibition strategy

    Science.gov (United States)

    Liu, Qing; Wen, Dafen; Yang, Yanran; Fei, Zhaoyang; Zhang, Zhuxiu; Chen, Xian; Tang, Jihai; Cui, Mifen; Qiao, Xu

    2018-03-01

    Hierarchical porous ZSM-5 (HP-ZSM-5) zeolites were synthesized by hydrothermal crystallization method adding triethoxyvinylsilane as the growth-inhibitor at different hydrothermal crystallized temperatures. The properties of the obtained samples were characterized by XRD, SEM, N2-sorption, uptake of ethylene, 27Al MAS NMR, NH3-TPD, and Py-IR. It was found that the mesopore was introduced and the acidity was adjusted over HP-ZSM-5 samples successfully. The hydrothermal crystallized temperature had an important influence on the porous structure and surface properties. The catalytic performance for chloromethane to light-olefins (CMTO) were also investigated. Compared with ZSM-5 samples, HP-ZSM-5 samples exhibited enhanced stability and increased selectivity of light-olefins for CMTO reaction because of the introduction of the abundant mesopore and appropriate acidity. The lifetime (the duration of chloromethane conversion >98%) and selectivity of light-olefins reached 115 h and 69.3%, respectively.

  13. The Student Video Productions Handbook. A Guide to Planning and Teaching Student Video Productions.

    Science.gov (United States)

    Druce, Michael; Walker, Bob, Ed.

    This handbook provides novice video production teachers with a basic course outline containing information, activities, and lessons for use with high school students in an introductory television course. The contents are divided into five major sections: (1) before class begins, (2) preproduction, (3) production, (4) postproduction, and (5) the…

  14. Knowledge productivity : designing and testing a method to diagnose knowledge productivity and plan for enhancement

    NARCIS (Netherlands)

    Stam, C.D.

    2007-01-01

    Our economy has changed from an industrial into a knowledge economy in which knowledge productivity has become the main challenge. The lack of appropriate techniques to reveal knowledge productivity hinders organizations to design effective policies aiming at improving knowledge-based performance.

  15. Hierarchical Na-doped cubic ZrO{sub 2} synthesis by a simple hydrothermal route and its application in biodiesel production

    Energy Technology Data Exchange (ETDEWEB)

    Lara-García, Hugo A.; Romero-Ibarra, Issis C.; Pfeiffer, Heriberto, E-mail: pfeiffer@iim.unam.mx

    2014-10-15

    Hierarchical growth of cubic ZrO{sub 2} phase was successfully synthesized via a simple hydrothermal process in the presence of different surfactants (cationic, non-ionic and anionic) and sodium hydroxide. The structural and microstructural characterizations of different ZrO{sub 2} powders were performed using various techniques, such as X-ray diffraction, transmission electron microscopy, N{sub 2} adsorption–desorption, scanning electron microscopy and infrared. Results indicated that sodium addition stabilized the cubic ZrO{sub 2} phase by a Na-doping process, independently of the surfactant used. In contrast, microstructural characteristics varied as a function of the surfactant and sodium presence. In addition, water vapor (H{sub 2}O) and carbon dioxide (CO{sub 2}) sorption properties were evaluated on ZrO{sub 2} samples. Results evidenced that sample surface reactivity changed as a function of the sodium content. Finally, this surface reactivity was evaluated on the biodiesel transesterification reaction using the different synthesized samples, obtaining yields of 93%. - Graphical abstract: Hierarchical growth of cubic Na-ZrO{sub 2} phase was synthesized by hydrothermal processes in the presence of surfactants and sodium. Sodium addition stabilized the cubic phase by a Na-doping process, while the microstructural characteristics varied with surfactants. Finally, this surface reactivity was evaluated on the biodiesel transesterification reaction. - Highlights: • Cubic-ZrO{sub 2} phase was synthesized via a simple hydrothermal process. • ZrO{sub 2} structure and microstructures changed as a function of the surfactant. • Cubic-ZrO{sub 2} phase was evaluated on the biodiesel transesterification reaction.

  16. A Production Planning Model for Make-to-Order Foundry Flow Shop with Capacity Constraint

    Directory of Open Access Journals (Sweden)

    Xixing Li

    2017-01-01

    Full Text Available The mode of production in the modern manufacturing enterprise mainly prefers to MTO (Make-to-Order; how to reasonably arrange the production plan has become a very common and urgent problem for enterprises’ managers to improve inner production reformation in the competitive market environment. In this paper, a mathematical model of production planning is proposed to maximize the profit with capacity constraint. Four kinds of cost factors (material cost, process cost, delay cost, and facility occupy cost are considered in the proposed model. Different factors not only result in different profit but also result in different satisfaction degrees of customers. Particularly, the delay cost and facility occupy cost cannot reach the minimum at the same time; the two objectives are interactional. This paper presents a mathematical model based on the actual production process of a foundry flow shop. An improved genetic algorithm (IGA is proposed to solve the biobjective problem of the model. Also, the gene encoding and decoding, the definition of fitness function, and genetic operators have been illustrated. In addition, the proposed algorithm is used to solve the production planning problem of a foundry flow shop in a casting enterprise. And comparisons with other recently published algorithms show the efficiency and effectiveness of the proposed algorithm.

  17. Study on DSM-based task planning of product cooperative development

    Institute of Scientific and Technical Information of China (English)

    Jiang Zengqiang; Liu Mingzhou; Zhao Han; Ge Maogen; Guo Jia

    2008-01-01

    The results of analyzing the managerial characteristics and complexity of product cooperative development suggest that task planning is an important aspect for process management of product cooperative development and the method for planning tasks should be able to model the dependency between tasks and iterations during the development process. In this paper, a DSM-based method and its corresponding optimization algorithms are developed. At first the coupled task sets and uncoupled task sets are identified, and the tasks are then optimized by the corresponding algorithms. The optimal tasks plan will reduce the development time and cost. Considering the practical requirements in real world, a Multilayer DSM is proposed, and its information communication techniques between DSM and traversing principle are described in details.

  18. Analysis hierarchical model for discrete event systems

    Science.gov (United States)

    Ciortea, E. M.

    2015-11-01

    The This paper presents the hierarchical model based on discrete event network for robotic systems. Based on the hierarchical approach, Petri network is analysed as a network of the highest conceptual level and the lowest level of local control. For modelling and control of complex robotic systems using extended Petri nets. Such a system is structured, controlled and analysed in this paper by using Visual Object Net ++ package that is relatively simple and easy to use, and the results are shown as representations easy to interpret. The hierarchical structure of the robotic system is implemented on computers analysed using specialized programs. Implementation of hierarchical model discrete event systems, as a real-time operating system on a computer network connected via a serial bus is possible, where each computer is dedicated to local and Petri model of a subsystem global robotic system. Since Petri models are simplified to apply general computers, analysis, modelling, complex manufacturing systems control can be achieved using Petri nets. Discrete event systems is a pragmatic tool for modelling industrial systems. For system modelling using Petri nets because we have our system where discrete event. To highlight the auxiliary time Petri model using transport stream divided into hierarchical levels and sections are analysed successively. Proposed robotic system simulation using timed Petri, offers the opportunity to view the robotic time. Application of goods or robotic and transmission times obtained by measuring spot is obtained graphics showing the average time for transport activity, using the parameters sets of finished products. individually.

  19. Hierarchical Micro-Nano Coatings by Painting

    Science.gov (United States)

    Kirveslahti, Anna; Korhonen, Tuulia; Suvanto, Mika; Pakkanen, Tapani A.

    2016-03-01

    In this paper, the wettability properties of coatings with hierarchical surface structures and low surface energy were studied. Hierarchically structured coatings were produced by using hydrophobic fumed silica nanoparticles and polytetrafluoroethylene (PTFE) microparticles as additives in polyester (PES) and polyvinyldifluoride (PVDF). These particles created hierarchical micro-nano structures on the paint surfaces and lowered or supported the already low surface energy of the paint. Two standard application techniques for paint application were employed and the presented coatings are suitable for mass production and use in large surface areas. By regulating the particle concentrations, it was possible to modify wettability properties gradually. Highly hydrophobic surfaces were achieved with the highest contact angle of 165∘. Dynamic contact angle measurements were carried out for a set of selected samples and low hysteresis was obtained. Produced coatings possessed long lasting durability in the air and in underwater conditions.

  20. 15 CFR 714.3 - Advance declaration requirements for additionally planned production of Schedule 3 chemicals.

    Science.gov (United States)

    2010-01-01

    ... COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 3 CHEMICALS § 714.3 Advance... 15 Commerce and Foreign Trade 2 2010-01-01 2010-01-01 false Advance declaration requirements for additionally planned production of Schedule 3 chemicals. 714.3 Section 714.3 Commerce and Foreign Trade...

  1. Harvest operations for density management: planning requirements, production, costs, stand damage, and recommendations

    Science.gov (United States)

    Loren D. Kellogg; Stephen J. Pilkerton

    2013-01-01

    Since the early 1990s, several studies have been undertaken to determine the planning requirements, productivity, costs, and residual stand damage of harvest operations in thinning treatments designed to promote development of complex forest structure in order to enhance ecological functioning and biological diversity. Th ese studies include the Oregon State...

  2. Decommissioning planning and the assessment of alternatives for the Hanford production reactors

    International Nuclear Information System (INIS)

    Miller, C.E. Jr.; Potter, R.F.

    1985-01-01

    Several years ago, the US Department of Energy began assessing alternatives and planning the decommissioning of eight shut-down plutonium production reactors located on the DOE Hanford Site in Washington State. The first of these graphite-moderated, water-cooled, reactors was built and started up in 1944 as part of the World War II Manhattan Project. The last of them started up in 1955. The eight reactors each operated for 12 to 24 years, with all eight operating simultaneously for about 10 years. In the 1960's, production needs declined and the reactors were one-by-one permanently shut down, the last of them in 1971. (A ninth Hanford production reactor, N Reactor, was started up in 1963; it is still operating and is not within the scope of the decommissioning planning and alternatives assessment work reported in this paper). This paper provides an overview description of the decommissioning plan for the eight shut-down Hanford production reactors and their associated fuel storage basins. Included are descriptions of the decommissioning alternatives considered for the facilities, along with discussions of National Environmental Policy Act (NEPA) process activities applicable to the Hanford decommissioning work. The criteria used in assessing decommissioning alternatives and the assumptions used in the decommissioning planning are identified. 4 refs., 8 figs., 3 tabs

  3. Planning and Articulation in Incremental Word Production: Syllable-Frequency Effects in English

    Science.gov (United States)

    Cholin, Joana; Dell, Gary S.; Levelt, Willem J. M.

    2011-01-01

    We investigated the role of syllables during speech planning in English by measuring syllable-frequency effects. So far, syllable-frequency effects in English have not been reported. English has poorly defined syllable boundaries, and thus the syllable might not function as a prominent unit in English speech production. Speakers produced either…

  4. The effect of workload constraints in linear programming models for production planning

    NARCIS (Netherlands)

    Jansen, M.M.; Kok, de A.G.; Adan, I.J.B.F.

    2011-01-01

    Linear programming (LP) models for production planning incorporate a model of the manufacturing system that is necessarily deterministic. Although these deterministic models are the current state-of-the-art, it should be recognized that they are used in an environment that is inherently stochastic.

  5. The effect of workload constraints in mathematical programming models for production planning

    NARCIS (Netherlands)

    Jansen, M.M.; Kok, de A.G.; Adan, I.J.B.F.

    2010-01-01

    Linear and mixed integer programming models for production planning incorporate a model of the manufacturing system that is necessarily deterministic. Although these eterministic models are the current-state-of-art, it should be recognized that they are used in an environment that is inherently

  6. Product-market differentiation: a strategic planning model for community hospitals.

    Science.gov (United States)

    Milch, R A

    1980-01-01

    Community hospitals would seem to have every reason to identify and capitalize on their product-market strengths. The strategic marketing/planning model provides a framework for rational analysis of the community hospital dilemma and for developing sensible solutions to the complex problems of accelerating hospital price-inflation.

  7. Hierarchical species distribution models

    Science.gov (United States)

    Hefley, Trevor J.; Hooten, Mevin B.

    2016-01-01

    Determining the distribution pattern of a species is important to increase scientific knowledge, inform management decisions, and conserve biodiversity. To infer spatial and temporal patterns, species distribution models have been developed for use with many sampling designs and types of data. Recently, it has been shown that count, presence-absence, and presence-only data can be conceptualized as arising from a point process distribution. Therefore, it is important to understand properties of the point process distribution. We examine how the hierarchical species distribution modeling framework has been used to incorporate a wide array of regression and theory-based components while accounting for the data collection process and making use of auxiliary information. The hierarchical modeling framework allows us to demonstrate how several commonly used species distribution models can be derived from the point process distribution, highlight areas of potential overlap between different models, and suggest areas where further research is needed.

  8. Bayesian nonparametric hierarchical modeling.

    Science.gov (United States)

    Dunson, David B

    2009-04-01

    In biomedical research, hierarchical models are very widely used to accommodate dependence in multivariate and longitudinal data and for borrowing of information across data from different sources. A primary concern in hierarchical modeling is sensitivity to parametric assumptions, such as linearity and normality of the random effects. Parametric assumptions on latent variable distributions can be challenging to check and are typically unwarranted, given available prior knowledge. This article reviews some recent developments in Bayesian nonparametric methods motivated by complex, multivariate and functional data collected in biomedical studies. The author provides a brief review of flexible parametric approaches relying on finite mixtures and latent class modeling. Dirichlet process mixture models are motivated by the need to generalize these approaches to avoid assuming a fixed finite number of classes. Focusing on an epidemiology application, the author illustrates the practical utility and potential of nonparametric Bayes methods.

  9. Formation of 1D hierarchical structures composed of Ni{sub 3}S{sub 2} nanosheets on CNTs backbone for supercapacitors and photocatalytic H{sub 2} production

    Energy Technology Data Exchange (ETDEWEB)

    Zhu, Ting; Wu, Hao Bin; Wang, Yabo; Xu, Rong; Lou, Xiong Wen [David] [School of Chemical and Biomedical Engineering, Nanyang Technological University, 70 Nanyang Drive, Singapore 637457 (Singapore)

    2012-12-15

    One-dimensional (1D) hierarchical structures composed of Ni{sub 3}S{sub 2} nanosheets grown on carbon nanotube (CNT) backbone (denoted as CNT rate at Ni{sub 3}S{sub 2}) are fabricated by a rational multi-step transformation route. The first step involves coating the CNT backbone with a layer of silica to form CNT rate at SiO{sub 2}, which serves as the substrate for the growth of nickel silicate (NiSilicate) nanosheets in the second step to form CNT rate at SiO{sub 2} rate at NiSilicate core-double shell 1D structures. Finally the as-formed CNT rate at SiO{sub 2} rate at NiSilicate 1D structures are converted into CNT-supported Ni{sub 3}S{sub 2} nanosheets via hydrothermal treatment in the presence of Na{sub 2}S. Simultaneously the intermediate silica layer is eliminated during the hydrothermal treatment, leading to the formation of CNT rate at Ni{sub 3}S{sub 2} nanostructures. Because of the unique hybrid nano-architecture, the as-prepared 1D hierarchical structure is shown to exhibit excellent performance in both supercapacitors and photocatalytic H{sub 2} production. (Copyright copyright 2012 WILEY-VCH Verlag GmbH and Co. KGaA, Weinheim)

  10. Hierarchically Structured Electrospun Fibers

    Science.gov (United States)

    2013-01-07

    in the natural lotus and silver ragwort leaves. Figure 4. Examples of electrospun bio-mimics of natural hierarchical structures. (A) Lotus leaf...B) pillared poly(methyl methacrylate) (PMMA) electrospun fiber mimic; (C) silver ragwort leaf; (D) electrospun fiber mimic made from nylon 6 and...domains containing the protein in the surrounding EVA fibers [115]. A wide variety of core-shell fibers have been generated, including PCL/ gelatin

  11. Computer Aided Process Planning for Non-Axisymmetric Deep Drawing Products

    Science.gov (United States)

    Park, Dong Hwan; Yarlagadda, Prasad K. D. V.

    2004-06-01

    In general, deep drawing products have various cross-section shapes such as cylindrical, rectangular and non-axisymmetric shapes. The application of the surface area calculation to non-axisymmetric deep drawing process has not been published yet. In this research, a surface area calculation for non-axisymmetric deep drawing products with elliptical shape was constructed for a design of blank shape of deep drawing products by using an AutoLISP function of AutoCAD software. A computer-aided process planning (CAPP) system for rotationally symmetric deep drawing products has been developed. However, the application of the system to non-axisymmetric components has not been reported yet. Thus, the CAPP system for non-axisymmetric deep drawing products with elliptical shape was constructed by using process sequence design. The system developed in this work consists of four modules. The first is recognition of shape module to recognize non-axisymmetric products. The second is a three-dimensional (3-D) modeling module to calculate the surface area for non-axisymmetric products. The third is a blank design module to create an oval-shaped blank with the identical surface area. The forth is a process planning module based on the production rules that play the best important role in an expert system for manufacturing. The production rules are generated and upgraded by interviewing field engineers. Especially, the drawing coefficient, the punch and die radii for elliptical shape products are considered as main design parameters. The suitability of this system was verified by applying to a real deep drawing product. This CAPP system constructed would be very useful to reduce lead-time for manufacturing and improve an accuracy of products.

  12. Hierarchical video summarization

    Science.gov (United States)

    Ratakonda, Krishna; Sezan, M. Ibrahim; Crinon, Regis J.

    1998-12-01

    We address the problem of key-frame summarization of vide in the absence of any a priori information about its content. This is a common problem that is encountered in home videos. We propose a hierarchical key-frame summarization algorithm where a coarse-to-fine key-frame summary is generated. A hierarchical key-frame summary facilitates multi-level browsing where the user can quickly discover the content of the video by accessing its coarsest but most compact summary and then view a desired segment of the video with increasingly more detail. At the finest level, the summary is generated on the basis of color features of video frames, using an extension of a recently proposed key-frame extraction algorithm. The finest level key-frames are recursively clustered using a novel pairwise K-means clustering approach with temporal consecutiveness constraint. We also address summarization of MPEG-2 compressed video without fully decoding the bitstream. We also propose efficient mechanisms that facilitate decoding the video when the hierarchical summary is utilized in browsing and playback of video segments starting at selected key-frames.

  13. Hierarchically Structured Electrospun Fibers

    Directory of Open Access Journals (Sweden)

    Nicole E. Zander

    2013-01-01

    Full Text Available Traditional electrospun nanofibers have a myriad of applications ranging from scaffolds for tissue engineering to components of biosensors and energy harvesting devices. The generally smooth one-dimensional structure of the fibers has stood as a limitation to several interesting novel applications. Control of fiber diameter, porosity and collector geometry will be briefly discussed, as will more traditional methods for controlling fiber morphology and fiber mat architecture. The remainder of the review will focus on new techniques to prepare hierarchically structured fibers. Fibers with hierarchical primary structures—including helical, buckled, and beads-on-a-string fibers, as well as fibers with secondary structures, such as nanopores, nanopillars, nanorods, and internally structured fibers and their applications—will be discussed. These new materials with helical/buckled morphology are expected to possess unique optical and mechanical properties with possible applications for negative refractive index materials, highly stretchable/high-tensile-strength materials, and components in microelectromechanical devices. Core-shell type fibers enable a much wider variety of materials to be electrospun and are expected to be widely applied in the sensing, drug delivery/controlled release fields, and in the encapsulation of live cells for biological applications. Materials with a hierarchical secondary structure are expected to provide new superhydrophobic and self-cleaning materials.

  14. My university. What I learned from the Productive Cooperative Movement to Promotion of Humanistic Family Planning.

    Science.gov (United States)

    Kunii, C

    1990-07-01

    Based on experiences with the Productive Cooperative Movement and the Parasite Control Movement in Japan, the Japanese Family Planning Movement began in April 1954. The resultant private and nonprofit Japan Family Planning Association (JFPA) followed and it served to help Japan achieve its goal of reducing fertility by promoting family planning. It did so by publishing a monthly newsletter on family planning, hosting meetings and national conventions, spreading information via the mass media, and selling contraceptives and educational materials. JFPA earned funding from these sales with no support from the government thereby establishing self dependence and freedom to speak candidly to the government. The JFPA learned that families wanted to improve their standard of living and were willing to limit family size to 2 children. After the birth rate peaked in 1955, the birth rate and the number of illegal abortions decreased. In the 1950s, JFPA joined the International Planned Parenthood Federation and subsequently learned of the problems faced by developing countries. Based on the successful reduction of fertility in Japan and a strong economic base, JFPA and the government were in a position to organize an international cooperation program for family planning. Therefore, the leader of JFPA resigned to found the Japanese Organization for International Cooperation in Family Planning which promotes family planning in developing countries via its integrated family planning, nutrition, and parasite control program. A steering committee composed of leaders from government, universities, and private organizations sets the policies for the program in each country. It is to the Japanese government's advantage to work with private organizations instead of providing all social services because they are flexible and provide administrative stability and national expenses are minimized.

  15. Multi-annual planning of investments for heat production. 2009 - 2020 period

    International Nuclear Information System (INIS)

    2005-01-01

    A new Multi-annual Planning of Investments (PPI) for heat production in France has been realized in order to meet the conclusions of the Grenelle Environnement Forum for a better energy efficiency and a larger use of renewable energies. Based on quantitative data (the increase in heat production will reach more than 10 Mtoe by 2020), potential objectives have been assessed for the various heat production sources and techniques: wood, biomass (for buildings, district heating, industry and processes, cogeneration), deep and intermediary geothermal energy, individual heat pumps, individual and collective heat solar systems, biogas, etc. These objectives are said to be ambitious but reachable if every sources and techniques are thoroughly exploited

  16. Optimizing Maintenance Planning in the Production Industry Using the Markovian Approach

    Directory of Open Access Journals (Sweden)

    B Kareem

    2012-12-01

    Full Text Available Maintenance is an essential activity in every manufacturing establishment, as manufacturing effectiveness counts on the functionality of production equipment and machinery in terms of their productivity and operational life. Maintenance cost minimization can be achieved by adopting an appropriate maintenance planning policy. This paper applies the Markovian approach to maintenance planning decision, thereby generating optimal maintenance policy from the identified alternatives over a specified period of time. Markov chains, transition matrices, decision processes, and dynamic programming models were formulated for the decision problem related to maintenance operations of a cable production company. Preventive and corrective maintenance data based on workloads and costs, were collected from the company and utilized in this study. The result showed variability in the choice of optimal maintenance policy that was adopted in the case study. Post optimality analysis of the process buttressed the claim. The proposed approach is promising for solving the maintenance scheduling decision problems of the company.

  17. Uranium Mill Tailings Remedial Action Project: Cost Reduction and Productivity Improvement Program Project Plan

    International Nuclear Information System (INIS)

    1991-11-01

    The purpose of the Cost Reduction/Productivity Improvement Program Plan is to formalize and improve upon existing efforts to control costs which have been underway since project inception. This program plan has been coordinated with the Department of Energy (DOE) Office of Environmental Management (EM) and the DOE Field Office, Albuquerque (AL). It incorporates prior Uranium Mill Tallings Remedial Action (UMTRA) Project Office guidance issued on the subject. The opportunities for reducing cosh and improving productivity are endless. The CR/PIP has these primary objectives: Improve productivity and quality; heighten the general cost consciousness of project participants, at all levels of their organizations; identify and implement specific innovative employee ideas that extend beyond what is required through existing processes and procedures; emphasize efforts that create additional value for the money spent by maintaining the project Total Estimated Cost (TEC) at the lowest possible level

  18. AN APPROACH TO FINANCIAL RISK IN A PORTFOLIO FOR PLANNING THE INDUSTRIAL PRODUCTION OF PRODUCTS DERIVED FROM SUGARCANE

    Directory of Open Access Journals (Sweden)

    Thárcylla R.N. Clemente

    2015-12-01

    Full Text Available ABSTRACT Brazil's location and tropical weather conditions are favourable cultivating sugarcane, which has led to Brazil being one of the world's largest producers of sugarcane. The influence of the sugarcane industry on its economy stands out among the indicators of Brazilian economic growth and because the diversified investment when planning the production of products derived from this sector is encouraged. The decision on which derivative (for example, crystal sugar, anhydrous ethanol, or hydrous ethanol to produce from raw sugarcane can be modelled as an investment decision in a portfolio decision problem whenever a combination of these products is considered. As to the future price of these commodities, raw sugarcane is considered to be capital that should be invested. Thus, this paper puts forward a decision model which uses concepts from Decision Analysis and Bayesian Risk Analysis that may well assist the process of managing assets in the Brazilian sugarcane industry by considering the financial aspect when compiling a portfolio for planning production.

  19. Lexical Planning in Sentence Production Is Highly Incremental: Evidence from ERPs.

    Science.gov (United States)

    Zhao, Li-Ming; Yang, Yu-Fang

    2016-01-01

    The scope of lexical planning, which means how far ahead speakers plan lexically before they start producing an utterance, is an important issue for research into speech production, but remains highly controversial. The present research investigated this issue using the semantic blocking effect, which refers to the widely observed effects that participants take longer to say aloud the names of items in pictures when the pictures in a block of trials in an experiment depict items that belong to the same semantic category than different categories. As this effect is often interpreted as a reflection of difficulty in lexical selection, the current study took the semantic blocking effect and its associated pattern of event-related brain potentials (ERPs) as a proxy to test whether lexical planning during sentence production extends beyond the first noun when a subject noun-phrase includes two nouns, such as "The chair and the boat are both red" and "The chair above the boat is red". The results showed a semantic blocking effect both in onset latencies and in ERPs during the utterance of the first noun of these complex noun-phrases but not for the second noun. The indication, therefore, is that the lexical planning scope does not encompass this second noun-phrase. Indeed, the present findings are in line with accounts that propose radically incremental lexical planning, in which speakers plan ahead only one word at a time. This study also provides a highly novel example of using ERPs to examine the production of long utterances, and it is hoped the present demonstration of the effectiveness of this approach inspires further application of ERP techniques in this area of research.

  20. Productive and Economic Performance of Broiler Chickens Subjected to Different Nutritional Plans

    Directory of Open Access Journals (Sweden)

    JMS Martins

    Full Text Available ABSTRACT The objective of the study was to evaluate the effect of nutritional plans on the productive and economic performance of Hubbard Flex broiler chickens. A completely randomized experimental design was applied, consisting of five treatments. Treatments consisted of five different nutritional plans: a basal diet containing the nutrient and energy levels recommended by literature and designated reference diet; two diets containing 1.5% and 3% lower levels than the reference diet; and two diets containing 1.5% and 3% higher levels than the reference diet (-3%, -1.5%, reference plan, +1.5% and +3%. Feed intake (FI, body weight (BW, feed conversion rate (FCR, livability (L and productive efficient index (PEI were determined when broilers were 42 days old. Broilers were processed, and carcass and parts (breast fillet, leg, and wings yields were determined. The economic viablility of the nutitional plans was evaluated as a function of feed cost/kg live and carcass weights, economic efficiency index (EEI, and cost index (CI. Feed intake and the feed conversion rate decreased as dietary nutrient and energy levels increased. Feed cost/kg live weight, economic efficiency index, and cost index cost increased as dietary nutrient and energy levels increased. Feed intake, feed conversion ratio, production efficiency index, and breast yield improved with increasing nutritional and energy levels. However, worse economic results were obtained with higher nutritional and energy levels.

  1. Two efficient heuristics to solve the integrated load distribution and production planning problem

    International Nuclear Information System (INIS)

    Gajpal, Yuvraj; Nourelfath, Mustapha

    2015-01-01

    This paper considers a multi-period production system where a set of machines are arranged in parallel. The machines are unreliable and the failure rate of machine depends on the load assigned to the machine. The expected production rate of the system is considered to be a non-monotonic function of its load. Because of the machine failure rate, the total production output depends on the combination of loads assigned to different machines. We consider the integration of load distribution decisions with production planning decision. The product demands are considered to be known in advance. The objective is to minimize the sum of holding costs, backorder costs, production costs, setup costs, capacity change costs and unused capacity costs while satisfying the demand over specified time horizon. The constraint is not to exceed available repair resources required to repair the machine breakdown. The paper develops two heuristics to solve the integrated load distribution and production planning problem. The first heuristic consists of a three-phase approach, while the second one is based on tabu search metaheuristic. The efficiency of the proposed heuristics is tested through the randomly generated problem instances. - Highlights: • The expected performance of the system is a non-monotonic function of its load. • We consider the integration of load distribution and production planning decisions. • The paper proposes three phase and tabu search based heuristics to solve the problem. • Lower bound has been developed for checking the effectiveness of the heuristics. • The efficiency of the heuristic is tested through randomly generated instances.

  2. Work-in-process clearing in supply chain operations planning

    NARCIS (Netherlands)

    Selcuk, B.; Fransoo, J.C.; Kok, de A.G.

    2008-01-01

    In this study we provide insights into the effectiveness of the clearing function concept in a hierarchical planning context. The clearing function is a mathematical representation of the relation between the Work-In-Process (WIP) and the throughput of a production process. We use it in a

  3. Designing a two-rank acceptance sampling plan for quality inspection of geospatial data products

    Science.gov (United States)

    Tong, Xiaohua; Wang, Zhenhua; Xie, Huan; Liang, Dan; Jiang, Zuoqin; Li, Jinchao; Li, Jun

    2011-10-01

    To address the disadvantages of classical sampling plans designed for traditional industrial products, we originally propose a two-rank acceptance sampling plan (TRASP) for the inspection of geospatial data outputs based on the acceptance quality level (AQL). The first rank sampling plan is to inspect the lot consisting of map sheets, and the second is to inspect the lot consisting of features in an individual map sheet. The TRASP design is formulated as an optimization problem with respect to sample size and acceptance number, which covers two lot size cases. The first case is for a small lot size with nonconformities being modeled by a hypergeometric distribution function, and the second is for a larger lot size with nonconformities being modeled by a Poisson distribution function. The proposed TRASP is illustrated through two empirical case studies. Our analysis demonstrates that: (1) the proposed TRASP provides a general approach for quality inspection of geospatial data outputs consisting of non-uniform items and (2) the proposed acceptance sampling plan based on TRASP performs better than other classical sampling plans. It overcomes the drawbacks of percent sampling, i.e., "strictness for large lot size, toleration for small lot size," and those of a national standard used specifically for industrial outputs, i.e., "lots with different sizes corresponding to the same sampling plan."

  4. Production planning and control for semiconductor wafer fabrication facilities modeling, analysis, and systems

    CERN Document Server

    Mönch, Lars; Mason, Scott J

    2012-01-01

    Over the last fifty-plus years, the increased complexity and speed of integrated circuits have radically changed our world. Today, semiconductor manufacturing is perhaps the most important segment of the global manufacturing sector. As the semiconductor industry has become more competitive, improving planning and control has become a key factor for business success. This book is devoted to production planning and control problems in semiconductor wafer fabrication facilities. It is the first book that takes a comprehensive look at the role of modeling, analysis, and related information systems

  5. OPEC production: Capital limitations, environmental movements may interfere with expansion plans

    International Nuclear Information System (INIS)

    Ismail, I.A.H.

    1994-01-01

    Obtaining capital is a critical element in the production expansion plans of OPEC member countries. Another issue that may impact the plans is the environmental taxes that may reduce the call on OPEC oil by 5 million b/d in 2000 and about 16 million b/d in the year 2010. This concluding part of a two-part series discusses the expansion possibilities of non-Middle East OPEC members, OPEC's capital requirements, and environmental concerns. Non-Middle East OPEC includes Algeria, Gabon, Indonesia, Libya, Nigeria, and Venezuela

  6. A Science Products Inventory for Citizen-Science Planning and Evaluation.

    Science.gov (United States)

    Wiggins, Andrea; Bonney, Rick; LeBuhn, Gretchen; Parrish, Julia K; Weltzin, Jake F

    2018-06-01

    Citizen science involves a range of practices involving public participation in scientific knowledge production, but outcomes evaluation is complicated by the diversity of the goals and forms of citizen science. Publications and citations are not adequate metrics to describe citizen-science productivity. We address this gap by contributing a science products inventory (SPI) tool, iteratively developed through an expert panel and case studies, intended to support general-purpose planning and evaluation of citizen-science projects with respect to science productivity. The SPI includes a collection of items for tracking the production of science outputs and data practices, which are described and illustrated with examples. Several opportunities for further development of the initial inventory are highlighted, as well as potential for using the inventory as a tool to guide project management, funding, and research on citizen science.

  7. A science products inventory for citizen-science planning and evaluation

    Science.gov (United States)

    Wiggins, Andrea; Bonney, Rick; LeBuhn, Gretchen; Parrish, Julia K.; Weltzin, Jake F.

    2018-01-01

    Citizen science involves a range of practices involving public participation in scientific knowledge production, but outcomes evaluation is complicated by the diversity of the goals and forms of citizen science. Publications and citations are not adequate metrics to describe citizen-science productivity. We address this gap by contributing a science products inventory (SPI) tool, iteratively developed through an expert panel and case studies, intended to support general-purpose planning and evaluation of citizen-science projects with respect to science productivity. The SPI includes a collection of items for tracking the production of science outputs and data practices, which are described and illustrated with examples. Several opportunities for further development of the initial inventory are highlighted, as well as potential for using the inventory as a tool to guide project management, funding, and research on citizen science.

  8. A Science Products Inventory for Citizen-Science Planning and Evaluation

    Science.gov (United States)

    Wiggins, Andrea; Bonney, Rick; LeBuhn, Gretchen; Parrish, Julia K; Weltzin, Jake F

    2018-01-01

    Abstract Citizen science involves a range of practices involving public participation in scientific knowledge production, but outcomes evaluation is complicated by the diversity of the goals and forms of citizen science. Publications and citations are not adequate metrics to describe citizen-science productivity. We address this gap by contributing a science products inventory (SPI) tool, iteratively developed through an expert panel and case studies, intended to support general-purpose planning and evaluation of citizen-science projects with respect to science productivity. The SPI includes a collection of items for tracking the production of science outputs and data practices, which are described and illustrated with examples. Several opportunities for further development of the initial inventory are highlighted, as well as potential for using the inventory as a tool to guide project management, funding, and research on citizen science. PMID:29867254

  9. Knowledge co-production and boundary work to promote implementation of conservation plans.

    Science.gov (United States)

    Nel, Jeanne L; Roux, Dirk J; Driver, Amanda; Hill, Liesl; Maherry, Ashton C; Snaddon, Kate; Petersen, Chantel R; Smith-Adao, Lindie B; Van Deventer, Heidi; Reyers, Belinda

    2016-02-01

    Knowledge co-production and boundary work offer planners a new frame for critically designing a social process that fosters collaborative implementation of resulting plans. Knowledge co-production involves stakeholders from diverse knowledge systems working iteratively toward common vision and action. Boundary work is a means of creating permeable knowledge boundaries that satisfy the needs of multiple social groups while guarding the functional integrity of contributing knowledge systems. Resulting products are boundary objects of mutual interest that maintain coherence across all knowledge boundaries. We examined how knowledge co-production and boundary work can bridge the gap between planning and implementation and promote cross-sectoral cooperation. We applied these concepts to well-established stages in regional conservation planning within a national scale conservation planning project aimed at identifying areas for conserving rivers and wetlands of South Africa and developing an institutional environment for promoting their conservation. Knowledge co-production occurred iteratively over 4 years in interactive stake-holder workshops that included co-development of national freshwater conservation goals and spatial data on freshwater biodiversity and local conservation feasibility; translation of goals into quantitative inputs that were used in Marxan to select draft priority conservation areas; review of draft priority areas; and packaging of resulting map products into an atlas and implementation manual to promote application of the priority area maps in 37 different decision-making contexts. Knowledge co-production stimulated dialogue and negotiation and built capacity for multi-scale implementation beyond the project. The resulting maps and information integrated diverse knowledge types of over 450 stakeholders and represented >1000 years of collective experience. The maps provided a consistent national source of information on priority conservation areas

  10. 7 CFR Appendix D to Subpart E of... - Alcohol Production Facilities Planning, Performing, Development and Project Control

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 14 2010-01-01 2009-01-01 true Alcohol Production Facilities Planning, Performing... of Part 1980—Alcohol Production Facilities Planning, Performing, Development and Project Control (I..., without recourse to the Government, for the settlement and satisfaction of all contractual and...

  11. Effects of cognitive impairment on prosodic parameters of speech production planning in multiple sclerosis.

    Science.gov (United States)

    De Looze, Céline; Moreau, Noémie; Renié, Laurent; Kelly, Finnian; Ghio, Alain; Rico, Audrey; Audoin, Bertrand; Viallet, François; Pelletier, Jean; Petrone, Caterina

    2017-05-24

    Cognitive impairment (CI) affects 40-65% of patients with multiple sclerosis (MS). CI can have a negative impact on a patient's everyday activities, such as engaging in conversations. Speech production planning ability is crucial for successful verbal interactions and thus for preserving social and occupational skills. This study investigates the effect of cognitive-linguistic demand and CI on speech production planning in MS, as reflected in speech prosody. A secondary aim is to explore the clinical potential of prosodic features for the prediction of an individual's cognitive status in MS. A total of 45 subjects, that is 22 healthy controls (HC) and 23 patients in early stages of relapsing-remitting MS, underwent neuropsychological tests probing specific cognitive processes involved in speech production planning. All subjects also performed a read speech task, in which they had to read isolated sentences manipulated as for phonological length. Results show that the speech of MS patients with CI is mainly affected at the temporal level (articulation and speech rate, pause duration). Regression analyses further indicate that rate measures are correlated with working memory scores. In addition, linear discriminant analysis shows the ROC AUC of identifying MS patients with CI is 0.70 (95% confidence interval: 0.68-0.73). Our findings indicate that prosodic planning is deficient in patients with MS-CI and that the scope of planning depends on patients' cognitive abilities. We discuss how speech-based approaches could be used as an ecological method for the assessment and monitoring of CI in MS. © 2017 The British Psychological Society.

  12. Context updates are hierarchical

    Directory of Open Access Journals (Sweden)

    Anton Karl Ingason

    2016-10-01

    Full Text Available This squib studies the order in which elements are added to the shared context of interlocutors in a conversation. It focuses on context updates within one hierarchical structure and argues that structurally higher elements are entered into the context before lower elements, even if the structurally higher elements are pronounced after the lower elements. The crucial data are drawn from a comparison of relative clauses in two head-initial languages, English and Icelandic, and two head-final languages, Korean and Japanese. The findings have consequences for any theory of a dynamic semantics.

  13. Optimization of production planning in Czech agricultural co-operative via linear programming

    Directory of Open Access Journals (Sweden)

    Jitka Janová

    2009-01-01

    Full Text Available The production planning is one of the key managerial decisions in agricultural business, which must be done periodically every year. Correct decision must cover the agriculture demands of planting the crops such as crop rotation restrictions or water resource scarcity, while the decision maker aims to plan the crop design in most profitable way in sense of maximizing the total profit from the crop yield. This decision problem represents the optimization of crop design and can be treated by the me­thods of linear programming which begun to be extensively used in agriculture production planning in USA during 50’s. There is ongoing research of mathematical programming applications in agriculture worldwide, but the results are not easily transferable to other localities due to the specific local restrictions in each country. In Czech Republic the farmers use for production planning mainly their expert knowledge and past experience. However, the mathematical programming approach enables find the true optimal solution of the problem, which especially in the problems with a great number of constraints is not easy to find intuitively. One of the possible barriers for using the general decision support systems (which are based on mathematical programming methods for agriculture production planning in Czech Republic is its expensiveness. The small farmer can not afford to buy the expensive software or to employ a mathematical programming specialist. The aim of this paper is to present a user friendly linear programming model of the typical agricultural production planning problem in Czech Republic which can be solved via software tools commonly available in any farm (e.g. EXCEL. The linear programming model covering the restrictions on total costs, crop rotation, thresholds for the total area sowed by particular crops, total amount of manure and the need of feed crops is developed. The model is applied in real-world problem of Czech agriculture

  14. Inspection logistics planning for multi-stage production systems with applications to semiconductor fabrication lines

    Science.gov (United States)

    Chen, Kyle Dakai

    Since the market for semiconductor products has become more lucrative and competitive, research into improving yields for semiconductor fabrication lines has lately received a tremendous amount of attention. One of the most critical tasks in achieving such yield improvements is to plan the in-line inspection sampling efficiently so that any potential yield problems can be detected early and eliminated quickly. We formulate a multi-stage inspection planning model based on configurations in actual semiconductor fabrication lines, specifically taking into account both the capacity constraint and the congestion effects at the inspection station. We propose a new mixed First-Come-First-Serve (FCFS) and Last-Come-First-Serve (LCFS) discipline for serving the inspection samples to expedite the detection of potential yield problems. Employing this mixed FCFS and LCFS discipline, we derive approximate expressions for the queueing delays in yield problem detection time and develop near-optimal algorithms to obtain the inspection logistics planning policies. We also investigate the queueing performance with this mixed type of service discipline under different assumptions and configurations. In addition, we conduct numerical tests and generate managerial insights based on input data from actual semiconductor fabrication lines. To the best of our knowledge, this research is novel in developing, for the first time in the literature, near-optimal results for inspection logistics planning in multi-stage production systems with congestion effects explicitly considered.

  15. A decision support system for planning biomass-based energy production

    Energy Technology Data Exchange (ETDEWEB)

    Frombo, Francesco; Robba, Michela [DIST, Department of Communication, Computer and System Sciences, University of Genoa, Via Opera Pia 13, 16145 Genova (Italy); Renewable Energy Laboratory, Modelling and Optimization, Via A. Magliotto 2, 17100 Savona (Italy); Minciardi, Riccardo; Sacile, Roberto [DIST, Department of Communication, Computer and System Sciences, University of Genoa, Via Opera Pia 13, 16145 Genova (Italy)

    2009-03-15

    Environmental decision support systems (EDSS) are recognized as valuable tools for environmental planning and management. In this paper, a geographic information system (GIS)-based EDSS for the optimal planning of forest biomass use for energy production is presented. A user-friendly interface allows the creation of Scenarios and the running of the developed decision and environmental models. In particular, the optimization model regards decisions over a long-term period (e.g. years) and includes decision variables related to plant locations, conversion processes (pyrolisis, gasification, combustion), harvested biomass. Moreover, different energy products and different definitions of the harvesting and pre-treatment operations are taken into account. The correct management of the forest is considered through specific constraints, security factors, and procedures for parcel selection. The EDSS features and capabilities are described in detail, with specific reference to a case study. Discussion and further research are reported. (author)

  16. Supply Network Planning for New Product Market Entry in the Pharmaceutical Industry

    DEFF Research Database (Denmark)

    Hansen, Klaus Reinholdt Nyhuus; Grunow, Martin

    2011-01-01

    uncertainty and the risk of a forced label change and includes solution robustness. While considering limited shelf life of the drug, the supply of packaging material and outsourcing, the objective of our model is to reduce supply chain cost including lost peak sales from delayed market entry....... planning before and during the market entry of the drug after the drug has been approved. Production of the active pharmaceutical ingredient [API] is characterized by long change-over times due to cleaning requirements. Production planning is long term, multiple batches of each drug are produced...... industry, reimbursement negotiations have to be carried out before a drug can be marketed. These negotiations both necessitate time phasing market entries and introduce a series of uncertainties e.g. varying allowed price and awarded subsidy. Also if the label is not approved for marketing, all packaged...

  17. Mixed-Integer Linear Programming approaches to shelf-life-integrated planning and scheduling in yoghurt production

    NARCIS (Netherlands)

    Lütke Entrup, M.; Günther, H.O.; Beek, van P.; Grunow, M.; Seiler, T.

    2005-01-01

    In the production of perishable products such as dairy, meat or bakery goods, the consideration of shelf life in production planning is of particular importance. Retail customers with relatively low inventory turns can benefit significantly from longer product shelf life as wastage and out-of-stock

  18. Joint Optimal Production Planning for Complex Supply Chains Constrained by Carbon Emission Abatement Policies

    OpenAIRE

    He, Longfei; Xu, Zhaoguang; Niu, Zhanwen

    2014-01-01

    We focus on the joint production planning of complex supply chains facing stochastic demands and being constrained by carbon emission reduction policies. We pick two typical carbon emission reduction policies to research how emission regulation influences the profit and carbon footprint of a typical supply chain. We use the input-output model to capture the interrelated demand link between an arbitrary pair of two nodes in scenarios without or with carbon emission constraints. We design optim...

  19. Detecting Hierarchical Structure in Networks

    DEFF Research Database (Denmark)

    Herlau, Tue; Mørup, Morten; Schmidt, Mikkel Nørgaard

    2012-01-01

    Many real-world networks exhibit hierarchical organization. Previous models of hierarchies within relational data has focused on binary trees; however, for many networks it is unknown whether there is hierarchical structure, and if there is, a binary tree might not account well for it. We propose...... a generative Bayesian model that is able to infer whether hierarchies are present or not from a hypothesis space encompassing all types of hierarchical tree structures. For efficient inference we propose a collapsed Gibbs sampling procedure that jointly infers a partition and its hierarchical structure....... On synthetic and real data we demonstrate that our model can detect hierarchical structure leading to better link-prediction than competing models. Our model can be used to detect if a network exhibits hierarchical structure, thereby leading to a better comprehension and statistical account the network....

  20. JOINT OPTIMIZATION OF PRODUCTION PLANNING AND VEHICLE ROUTING PROBLEMS: A REVIEW OF EXISTING STRATEGIES

    Directory of Open Access Journals (Sweden)

    Marc Reimann

    2014-05-01

    Full Text Available Keen competition and increasingly demanding customers have forced companies to use their resources more efficiently and to integrate production and transportation planning. In the last few years more and more researchers have also focused on this challenging problem by trying to determine the complexity of the individual problems and then developing fast and robust algorithms to solve them. This paper reviews existing literature on integrated production and distribution decisions at the tactical and operational level, where the distribution part is modelled as some variation of the well-known Vehicle Routing Problem (VRP. The focus is thereby on problems that explicitly consider deliveries to multiple clients in a less-than-truckload fashion. In terms of the production decisions we distinguish in our review between tactical and operational production problems by considering lot-sizing/capacity allocation and scheduling models, respectively.

  1. Production layout improvement by using line balancing and Systematic Layout Planning (SLP) at PT. XYZ

    Science.gov (United States)

    Buchari; Tarigan, U.; Ambarita, M. B.

    2018-02-01

    PT. XYZ is a wood processing company which produce semi-finished wood with production system is make to order. In the production process, it can be seen that the production line is not balanced. The imbalance of the production line is caused by the difference in cycle time between work stations. In addition, there are other issues, namely the existence of material flow pattern is irregular so it resulted in the backtracking and displacement distance away. This study aimed to obtain the allocation of work elements to specific work stations and propose an improvement of the production layout based on the result of improvements in the line balancing. The method used in the balancing is Ranked Positional Weight (RPW) or also known as Helgeson Birnie method. While the methods used in the improvement of the layout is the method of Systematic Layout Planning (SLP). By using Ranked Positional Weight (RPW) obtained increase in line efficiency becomes 84,86% and decreased balance delay becomes 15,14%. Repairing the layout using the method of Systematic Layout Planning (SLP) also give good results with a reduction in path length becomes 133,82 meters from 213,09 meters previously or a decrease of 37.2%.

  2. Integrated Strategic Planning of Global Production Networks and Financial Hedging under Uncertain Demands and Exchange Rates

    Directory of Open Access Journals (Sweden)

    Achim Koberstein

    2013-11-01

    Full Text Available In this paper, we present a multi-stage stochastic programming model that integrates financial hedging decisions into the planning of strategic production networks under uncertain exchange rates and product demands. This model considers the expenses of production plants and the revenues of markets in different currency areas. Financial portfolio planning decisions for two types of financial instruments, forward contracts and options, are represented explicitly by multi-period decision variables and a multi-stage scenario tree. Using an illustrative example, we analyze the impact of exchange-rate and demand volatility, the level of investment expenses and interest rate spreads on capacity location and dimensioning decisions. In particular, we show that, in the illustrative example, the exchange-rate uncertainty cannot be completely eliminated by financial hedging in the presence of demand uncertainty. In this situation, we find that the integrated model can result in better strategic planning decisions for a risk-averse decision maker compared to traditional modeling approaches.

  3. Strategic planning as a competitive differential: A case study of the Sealed Sources Production Laboratory

    International Nuclear Information System (INIS)

    Vieira, Imário; Nascimento, Fernando C.; Calvo, Wilson A. Parejo

    2017-01-01

    Strategic planning has always been and continues to be one of the most important management tools for decision making. Amidst the uncertainties of the 21"s"t century, public, private and third sector organizations are steadily struggling to improve their strategic plans by using more effective results management tools such as BSC-Balanced Scorecard. Nuclear research institutes and research centers around the world have been using more and more these types of tools in their strategic planning and management. The objective of this article was to recommend the use the BSC as a strategic tool for decision making for the Sealed Sources Production Laboratory located in the Radiation Technology Center, at Nuclear and Energy Research Institute (IPEN/CNEN-SP), in Sao Paulo, Brazil. The methodology used in this academic article was a case study, which considered the object of the study, the Sealed Sources Production Laboratory, from January 2014 to August 2016. Among the main results obtained with this study can be cited: the improvement of the information flow, the visualization and proposition to change the periodicity of analysis of the results, among others. In view of the expected results, it was possible to conclude that this study may be of value to the Sealed Sources Production Laboratory for Industrial Radiography and Industrial Process Control and also to other research centers, as it will allow and contribute with an additional management support tool. (author)

  4. Strategic planning as a competitive differential: A case study of the Sealed Sources Production Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Vieira, Imário; Nascimento, Fernando C.; Calvo, Wilson A. Parejo, E-mail: imariovieira@yahoo.com, E-mail: wapcalvo@ipen.br, E-mail: fcodelo@gmail.com [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN-SP), Sao Paulo, SP (Brazil); Faculdade SENAI de Tecnologia Ambiental, Sao Bernardo do Campo, SP (Brazil)

    2017-11-01

    Strategic planning has always been and continues to be one of the most important management tools for decision making. Amidst the uncertainties of the 21{sup st} century, public, private and third sector organizations are steadily struggling to improve their strategic plans by using more effective results management tools such as BSC-Balanced Scorecard. Nuclear research institutes and research centers around the world have been using more and more these types of tools in their strategic planning and management. The objective of this article was to recommend the use the BSC as a strategic tool for decision making for the Sealed Sources Production Laboratory located in the Radiation Technology Center, at Nuclear and Energy Research Institute (IPEN/CNEN-SP), in Sao Paulo, Brazil. The methodology used in this academic article was a case study, which considered the object of the study, the Sealed Sources Production Laboratory, from January 2014 to August 2016. Among the main results obtained with this study can be cited: the improvement of the information flow, the visualization and proposition to change the periodicity of analysis of the results, among others. In view of the expected results, it was possible to conclude that this study may be of value to the Sealed Sources Production Laboratory for Industrial Radiography and Industrial Process Control and also to other research centers, as it will allow and contribute with an additional management support tool. (author)

  5. Road network safety evaluation using Bayesian hierarchical joint model.

    Science.gov (United States)

    Wang, Jie; Huang, Helai

    2016-05-01

    Safety and efficiency are commonly regarded as two significant performance indicators of transportation systems. In practice, road network planning has focused on road capacity and transport efficiency whereas the safety level of a road network has received little attention in the planning stage. This study develops a Bayesian hierarchical joint model for road network safety evaluation to help planners take traffic safety into account when planning a road network. The proposed model establishes relationships between road network risk and micro-level variables related to road entities and traffic volume, as well as socioeconomic, trip generation and network density variables at macro level which are generally used for long term transportation plans. In addition, network spatial correlation between intersections and their connected road segments is also considered in the model. A road network is elaborately selected in order to compare the proposed hierarchical joint model with a previous joint model and a negative binomial model. According to the results of the model comparison, the hierarchical joint model outperforms the joint model and negative binomial model in terms of the goodness-of-fit and predictive performance, which indicates the reasonableness of considering the hierarchical data structure in crash prediction and analysis. Moreover, both random effects at the TAZ level and the spatial correlation between intersections and their adjacent segments are found to be significant, supporting the employment of the hierarchical joint model as an alternative in road-network-level safety modeling as well. Copyright © 2016 Elsevier Ltd. All rights reserved.

  6. Nested and Hierarchical Archimax copulas

    KAUST Repository

    Hofert, Marius; Huser, Raphaë l; Prasad, Avinash

    2017-01-01

    The class of Archimax copulas is generalized to nested and hierarchical Archimax copulas in several ways. First, nested extreme-value copulas or nested stable tail dependence functions are introduced to construct nested Archimax copulas based on a single frailty variable. Second, a hierarchical construction of d-norm generators is presented to construct hierarchical stable tail dependence functions and thus hierarchical extreme-value copulas. Moreover, one can, by itself or additionally, introduce nested frailties to extend Archimax copulas to nested Archimax copulas in a similar way as nested Archimedean copulas extend Archimedean copulas. Further results include a general formula for the density of Archimax copulas.

  7. Nested and Hierarchical Archimax copulas

    KAUST Repository

    Hofert, Marius

    2017-07-03

    The class of Archimax copulas is generalized to nested and hierarchical Archimax copulas in several ways. First, nested extreme-value copulas or nested stable tail dependence functions are introduced to construct nested Archimax copulas based on a single frailty variable. Second, a hierarchical construction of d-norm generators is presented to construct hierarchical stable tail dependence functions and thus hierarchical extreme-value copulas. Moreover, one can, by itself or additionally, introduce nested frailties to extend Archimax copulas to nested Archimax copulas in a similar way as nested Archimedean copulas extend Archimedean copulas. Further results include a general formula for the density of Archimax copulas.

  8. A framework for production control in health care organizations

    NARCIS (Netherlands)

    Vissers, Jan; Bertrand, J.W.M.; Vries, de G.

    2001-01-01

    The paper presents a hierarchical framework for production control of hospitals which deals with the balance between service and efficiency, at all levels of planning and control. The framework is based on an analysis of the design requirements for hospital production control systems. These design

  9. Feed Materials Production Center waste management plan (Revision to NLCO-1100, R.6)

    International Nuclear Information System (INIS)

    Watts, R.E.; Allen, T.; Castle, S.A.; Hopper, J.P.; Oelrich, R.L.

    1986-01-01

    In the process of producing uranium metal products used in Department of Energy (DOE) defense programs at other DOE facilities, various types of wastes are generated at the Feed Materials Production Center (FMPC). Process wastes, both generated and stored, are discussed in the Waste Management Plan and include low-level radioactive waste (LLW), mixed hazardous/radioactive waste, and sanitary/industrial waste. Scrap metal waste and wastes requiring special remediation are also addressed in the Plan. The Waste Management Plan identifies the comprehensive programs developed to address safe storage and disposition of all wastes from past, present, and future operations at the FMPC. Waste streams discussed in this Plan are representative of the wastes generated and waste types that concern worker and public health and safety. Budgets and schedules for implementation of waste disposition are also addressed. The waste streams receiving the largest amount of funding include LLW approved for shipment by DOE/ORO to the Nevada Test Site (NTS) (MgF 2 , slag leach filter cake, and neutralized raffinate); remedial action wastes (waste pits, K-65 silo waste); thorium; scrap metal (contaminated and noncontaminated ferrous and copper scrap); construction rubble and soil generated from decontamination and decommissioning of outdated facilities; and low-level wastes that will be handled through the Low-Level Waste Processing and Shipping System (LLWPSS). Waste Management milestones are also provided. The Waste Management Plan is divided into eight major sections: Introduction; Site Waste and Waste Generating Process; Strategy; Projects and Operations; Waste Stream Budgets; Milestones; Quality Assurance for Waste Management; and Environmental Monitoring Program

  10. Applying the theory of planned behavior to predict dairy product consumption by older adults.

    Science.gov (United States)

    Kim, Kyungwon; Reicks, Marla; Sjoberg, Sara

    2003-01-01

    The purpose of this study was to explain intention to consume dairy products and consumption of dairy products by older adults using the Theory of Planned Behavior (TPB). The factors examined were attitudes, subjective norms, and perceived behavioral control. A cross-sectional questionnaire was administered. Community centers with congregate dining programs, group classes, and recreational events for older adults. One hundred and sixty-two older adults (mean age 75 years) completed the questionnaire. Subjects were mostly women (76%) and white (65%), with about half having less than a high school education or completing high school. Variables based on the TPB were assessed through questionnaire items that were constructed to form scales measuring attitudes, subjective norms, perceived behavioral control, and intention to consume dairy products. Dairy product consumption was measured using a food frequency questionnaire. Regression analyses were used to determine the association between the scales for the 3 variables proposed in the TPB and intention to consume and consumption of dairy products; the alpha level was set at.05 to determine the statistical significance of results. Attitudes toward eating dairy products and perceived behavioral control contributed to the model for predicting intention, whereas subjective norms did not. Attitudes toward eating dairy products were slightly more important than perceived behavioral control in predicting intention. In turn, intention was strongly related to dairy product consumption, and perceived behavioral control was independently associated with dairy product consumption. These results suggest the utility of the TPB in explaining dairy product consumption for older adults. Nutrition education should focus on improving attitudes and removing barriers to consumption of dairy products for older adults.

  11. Optimizing production and imperfect preventive maintenance planning's integration in failure-prone manufacturing systems

    International Nuclear Information System (INIS)

    Aghezzaf, El-Houssaine; Khatab, Abdelhakim; Tam, Phuoc Le

    2016-01-01

    This paper investigates the issue of integrating production and maintenance planning in a failure-prone manufacturing system. It is assumed that the system's operating state is stochastically predictable, in terms of its operating age, and that it can accordingly be preventively maintained during preplanned periods. Preventive maintenance is assumed to be imperfect, that is when performed, it brings the manufacturing system to an operating state that lies between ‘as bad as old’ and ‘as good as new’. Only an overhauling of the system brings it to a ‘as good as new’ operating state again. A practical integrated production and preventive maintenance planning model, that takes into account the system's manufacturing capacity and its operational reliability state, is developed. The model is naturally formulated as a mixed-integer non-linear optimization problem, for which an extended mixed-integer linear reformulation is proposed. This reformulation, while it solves the proposed integrated planning problem to optimality, remains quite demanding in terms of computational time. A fix-and-optimize procedure, that takes advantage of some properties of the original model, is then proposed. The reformulation and the fix-and-optimize procedure are tested on some test instances adapted from those available in the literature. The results show that the proposed fix-and-optimize procedure performs quite well and opens new research direction for future improvements. - Highlights: • Integration of production planning and imperfect preventive maintenance is explored. • Imperfect maintenance is modeled using a fitting age reduction hybrid hazard rate. • A practical approximate optimization model for this integration is proposed. • The resulting naturally MINL optimization model is reformulated and solved as a MILP. • An effective fix-and-optimize procedure is proposed for large instances of this MILP.

  12. Implementation of Capacity Planning Agent of Demand Responsive Planning Framework : Master’s Thesis in Production Engineering of The Royal Institute of Technology

    OpenAIRE

    Juhong, Nirut

    2013-01-01

    This master’s thesis is conducted as a conclusion of Master degree of Science in Production Engineering and Management at The Royal Institute of Technology. The focus of this thesis work is to implement a Capacity planning agent. Nowadays, companies need to adapt themselves to be as responsive to customers’ demand as possible. However, the responsiveness is usually limited by the fixed capacity of the production. Evolvable Production System (EPS), motivated by the limitation mentioned above, ...

  13. An effective heuristic for combined heat-and-power production planning with power ramp constraints

    International Nuclear Information System (INIS)

    Rong, Aiying; Lahdelma, Risto

    2007-01-01

    Combined heat-and-power (CHP) production is an increasingly important technology for its efficient utilization of primary-energy resources and for reducing CO 2 emissions. In the CHP plant, the generation of heat-and-power follows a joint characteristic, which makes the determination of both the marginal power production cost (MPPC) and the feasible operating region for the plant more complicated than for the power-only generation plant. Due to the interdependence between heat and power production, the power-ramp constraints, which limit how much the power production of a CHP plant may increase or decrease between two successive periods, may also imply constraints on the heat production. In this paper, we investigate the impact of power-ramp constraints on CHP production planning and develop a robust heuristic for dealing with the power-ramp constraints based on the solution to the problem with relaxed ramp-constraints (RRC). Numerical results based on realistic production models show that the heuristic can generate high-quality solutions efficiently. (author)

  14. Hybrid production planning system in make-to-order company - case study

    Directory of Open Access Journals (Sweden)

    2010-12-01

    Full Text Available This paper presents hybrid production planning and shop floor control system in make-to-order manufacturing of complex products. It presents the general idea of multi-hybrid system and selected practical aspects of its creation and its implementation. The construction of this system is based on the planning and executive levels and main aspects of its integration and its support tools. The research was carried out in HCP S.A. Poznan (Diesel Engines and Generating Sets Factory. HCP S.A. Poznan is the producer of high-power marine engines. The lead-time of the final product manufacturing is between 9 months and 1 year, and takes about 40.000 hours per one engine. The main problems of this production system are high share of the work in progress and long lead-time, which, as a result, causes many expenses. The flow of material streams is extremely complex and represents "A-plant" class, according to V-A-T classification, including significant internal constraints ("bottlenecks".

  15. Proposal for a strategic planning for the replacement of products in stores based on sales forecast

    Directory of Open Access Journals (Sweden)

    Cassius Tadeu Scarpin

    2011-08-01

    Full Text Available This paper presents a proposal for strategic planning for the replacement of products in stores of a supermarket network. A quantitative method for forecasting time series is used for this, the Artificial Radial Basis Neural Networks (RBFs, and also a qualitative method to interpret the forecasting results and establish limits for each product stock for each store in the network. The purpose with this strategic planning is to reduce the levels of out-of-stock products (lack of products on the shelves, as well as not to produce overstocking, in addition to increase the level of logistics service to customers. The results were highly satisfactory reducing the Distribution Center (DC to shop out-of-stock levels, in average, from 12% to about 0.7% in hypermarkets and from 15% to about 1.7% in supermarkets, thereby generating numerous competitive advantages for the company. The use of RBFs for forecasting proved to be efficient when used in conjunction with the replacement strategy proposed in this work, making effective the operational processes.

  16. Stochastic production planning for a biofuel supply chain under demand and price uncertainties

    International Nuclear Information System (INIS)

    Awudu, Iddrisu; Zhang, Jun

    2013-01-01

    Highlights: ► The proposed stochastic model outperforms the deterministic model. ► The price of biofuel is modeled as Geometric Brownian Motion (GBM). ► The proposed model can be applied in any biofuel supply chain. -- Abstract: In this paper, we propose a stochastic production planning model for a biofuel supply chain under demand and price uncertainties. The supply chain consists of biomass suppliers, biofuel refinery plants and distribution centers. A stochastic linear programming model is proposed within a single-period planning framework to maximize the expected profit. Decisions such as the amount of raw materials purchased, the amount of raw materials consumed and the amount of products produced are considered. Demands of end products are uncertain with known probability distributions. The prices of end products follow Geometric Brownian Motion (GBM). Benders decomposition (BD) with Monte Carlo simulation technique is applied to solve the proposed model. To demonstrate the effectiveness of the proposed stochastic model and the decomposition algorithm, a representative supply chain for an ethanol plant in North Dakota is considered. To investigate the results of the proposed model, a simulation framework is developed to compare the performances of deterministic model and proposed stochastic model. The results from the simulation indicate the proposed model obtain higher expected profit than the deterministic model under different uncertainty settings. Sensitivity analyses are performed to gain management insight on how profit changes due to the uncertainties affect the model developed.

  17. Planning Risk-Based SQC Schedules for Bracketed Operation of Continuous Production Analyzers.

    Science.gov (United States)

    Westgard, James O; Bayat, Hassan; Westgard, Sten A

    2018-02-01

    To minimize patient risk, "bracketed" statistical quality control (SQC) is recommended in the new CLSI guidelines for SQC (C24-Ed4). Bracketed SQC requires that a QC event both precedes and follows (brackets) a group of patient samples. In optimizing a QC schedule, the frequency of QC or run size becomes an important planning consideration to maintain quality and also facilitate responsive reporting of results from continuous operation of high production analytic systems. Different plans for optimizing a bracketed SQC schedule were investigated on the basis of Parvin's model for patient risk and CLSI C24-Ed4's recommendations for establishing QC schedules. A Sigma-metric run size nomogram was used to evaluate different QC schedules for processes of different sigma performance. For high Sigma performance, an effective SQC approach is to employ a multistage QC procedure utilizing a "startup" design at the beginning of production and a "monitor" design periodically throughout production. Example QC schedules are illustrated for applications with measurement procedures having 6-σ, 5-σ, and 4-σ performance. Continuous production analyzers that demonstrate high σ performance can be effectively controlled with multistage SQC designs that employ a startup QC event followed by periodic monitoring or bracketing QC events. Such designs can be optimized to minimize the risk of harm to patients. © 2017 American Association for Clinical Chemistry.

  18. Internal transport control in pot plant production

    NARCIS (Netherlands)

    Annevelink, E.

    1999-01-01

    Drawing up internal transport schedules in pot plant production is a very complex task. Scheduling internal transport at the operational level and providing control on a day-to-day or even hour-to-hour basis in particular requires a new approach. A hierarchical planning approach based on

  19. Concepts and Plans towards fast large scale Monte Carlo production for the ATLAS Experiment

    CERN Document Server

    Chapman, J; Duehrssen, M; Elsing, M; Froidevaux, D; Harrington, R; Jansky, R; Langenberg, R; Mandrysch, R; Marshall, Z; Ritsch, E; Salzburger, A

    2014-01-01

    The huge success of the physics program of the ATLAS experiment at the Large Hadron Collider (LHC) during run I relies upon a great number of simulated Monte Carlo events. This Monte Carlo production takes the biggest part of the computing resources being in use by ATLAS as of now. In this document we describe the plans to overcome the computing resource limitations for large scale Monte Carlo production in the ATLAS Experiment for run II, and beyond. A number of fast detector simulation, digitization and reconstruction techniques and are being discussed, based upon a new flexible detector simulation framework. To optimally benefit from these developments, a redesigned ATLAS MC production chain is presented at the end of this document.

  20. Concepts and Plans towards fast large scale Monte Carlo production for the ATLAS Experiment

    Science.gov (United States)

    Ritsch, E.; Atlas Collaboration

    2014-06-01

    The huge success of the physics program of the ATLAS experiment at the Large Hadron Collider (LHC) during Run 1 relies upon a great number of simulated Monte Carlo events. This Monte Carlo production takes the biggest part of the computing resources being in use by ATLAS as of now. In this document we describe the plans to overcome the computing resource limitations for large scale Monte Carlo production in the ATLAS Experiment for Run 2, and beyond. A number of fast detector simulation, digitization and reconstruction techniques are being discussed, based upon a new flexible detector simulation framework. To optimally benefit from these developments, a redesigned ATLAS MC production chain is presented at the end of this document.

  1. Planning woody biomass logistics for energy production: A strategic decision model

    International Nuclear Information System (INIS)

    Frombo, F.; Robba, M.; Minciardi, R.; Sacile, R.; Rosso, F.

    2009-01-01

    One of the key factors on which the sustainable development of modern society should be based is the possibility to take advantage of renewable energies. Biomass resources are one of the most common and widespread resources in the world. Their use to produce energy has many advantages, such as the reduction of greenhouse emissions. This paper describes a GIS-based Environmental Decision Support System (EDSS) to define planning and management strategies for the optimal logistics for energy production from woody biomass, such as forest biomass, agricultural scraps and industrial and urban untreated wood residues. The EDSS is characterized by three main levels: the GIS, the database, and the optimization. The optimization module is divided in three sub-modules to face different kinds of decision problems: strategic planning, tactical planning, and operational management. The aim of this article is to describe the strategic planning level in detail. The decision variables are represented by plant capacity and harvested biomass in a specific forest parcel for each slope class, while the objective function is the sum of the costs related to plant installation and maintenance, biomass transportation and collection, minus the benefits coming from the energy sales at the current market price, including the renewable energy certificates. Moreover, the optimization problem is structured through a set of parameters and equations that are able to encompass different energy conversion technologies (pyrolysis, gasification or combustion) in the system. A case study on the Liguria Region (Savona Province) is presented and results are discussed. (author)

  2. Determination of radiography optimum conditions for complex shape products by simplex planning method

    International Nuclear Information System (INIS)

    Kipnis, M.A.; Korsunskij, G.M.; Mironenko, A.F.

    1984-01-01

    It has been suggested that the optimum regime of radiography should be determined using the method of successive simplex planning, which can be convenient in the cases, when the result of testing can not be presented quantitatively. Besides, in this case there is no necessity in duplication of experiments, as even gross errors are automatically corrected with further simplex motion. A plan and results of experimental determination of the optimum regime of product radiography using the X-ray RUP-120-5-1 apparatus are presented. In the experiments described voltage, current intensity and radiography duration are varied. The quality of X-ray images is evaluated according to conventional ten-point scale, taking into account the quality of each projection. It has been established that application of simplex planning to determine regimes of X-ray radiography of different types of products permits to obtain high-quality roentgenograms with simultaneous decrease in the consumption of photomaterials and considerable decrease in the time of laboratory tests

  3. Multiobjective Joint Optimization of Production Scheduling and Maintenance Planning in the Flexible Job-Shop Problem

    Directory of Open Access Journals (Sweden)

    Jianfei Ye

    2015-01-01

    Full Text Available In order to solve the joint optimization of production scheduling and maintenance planning problem in the flexible job-shop, a multiobjective joint optimization model considering the maximum completion time and maintenance costs per unit time is established based on the concept of flexible job-shop and preventive maintenance. A weighted sum method is adopted to eliminate the index dimension. In addition, a double-coded genetic algorithm is designed according to the problem characteristics. The best result under the circumstances of joint decision-making is obtained through multiple simulation experiments, which proves the validity of the algorithm. We can prove the superiority of joint optimization model by comparing the result of joint decision-making project with the result of independent decision-making project under fixed preventive maintenance period. This study will enrich and expand the theoretical framework and analytical methods of this problem; it provides a scientific decision analysis method for enterprise to make production plan and maintenance plan.

  4. Anticipation in supply chain operations planning

    NARCIS (Netherlands)

    Jansen, M.M.

    2012-01-01

    Complex production and distribution networks are governed by implicit or explicit hierarchical decision making processes. This thesis contributes to the understanding of such hierarchical decision making processes. Our starting point is the Eindhoven Framework for Production and Inventory Control.

  5. Transmutations across hierarchical levels

    International Nuclear Information System (INIS)

    O'Neill, R.V.

    1977-01-01

    The development of large-scale ecological models depends implicitly on a concept known as hierarchy theory which views biological systems in a series of hierarchical levels (i.e., organism, population, trophic level, ecosystem). The theory states that an explanation of a biological phenomenon is provided when it is shown to be the consequence of the activities of the system's components, which are themselves systems in the next lower level of the hierarchy. Thus, the behavior of a population is explained by the behavior of the organisms in the population. The initial step in any modeling project is, therefore, to identify the system components and the interactions between them. A series of examples of transmutations in aquatic and terrestrial ecosystems are presented to show how and why changes occur. The types of changes are summarized and possible implications of transmutation for hierarchy theory, for the modeler, and for the ecological theoretician are discussed

  6. Trees and Hierarchical Structures

    CERN Document Server

    Haeseler, Arndt

    1990-01-01

    The "raison d'etre" of hierarchical dustering theory stems from one basic phe­ nomenon: This is the notorious non-transitivity of similarity relations. In spite of the fact that very often two objects may be quite similar to a third without being that similar to each other, one still wants to dassify objects according to their similarity. This should be achieved by grouping them into a hierarchy of non-overlapping dusters such that any two objects in ~ne duster appear to be more related to each other than they are to objects outside this duster. In everyday life, as well as in essentially every field of scientific investigation, there is an urge to reduce complexity by recognizing and establishing reasonable das­ sification schemes. Unfortunately, this is counterbalanced by the experience of seemingly unavoidable deadlocks caused by the existence of sequences of objects, each comparatively similar to the next, but the last rather different from the first.

  7. Optimisation by hierarchical search

    Science.gov (United States)

    Zintchenko, Ilia; Hastings, Matthew; Troyer, Matthias

    2015-03-01

    Finding optimal values for a set of variables relative to a cost function gives rise to some of the hardest problems in physics, computer science and applied mathematics. Although often very simple in their formulation, these problems have a complex cost function landscape which prevents currently known algorithms from efficiently finding the global optimum. Countless techniques have been proposed to partially circumvent this problem, but an efficient method is yet to be found. We present a heuristic, general purpose approach to potentially improve the performance of conventional algorithms or special purpose hardware devices by optimising groups of variables in a hierarchical way. We apply this approach to problems in combinatorial optimisation, machine learning and other fields.

  8. Approach for planning and operation of energy-efficient production systems; Vorgehensweise fuer Planung und Betrieb energieeffizienter Produktionssysteme

    Energy Technology Data Exchange (ETDEWEB)

    Weinert, Nils

    2010-07-02

    The integration of energy efficiency criteria into planning and operating of production systems substantially contributes to resource productivity and thus is an essential prerequisite for global sustainable development. Great potential can be identified for an early consideration of energy efficiency measures in an early planning phase. It is necessary to determine energy requirements during the planning process before the system is implemented. The objective of this thesis is the development of a planning system for the detailed prognosis of a production system's energy consumption. A concept is derived, by which a time based prediction of the amount of energy required by each machine and thus by the whole production system becomes possible. The planning system is methodologically integrated with well established approaches for manufacturing and factory planning. The methodology is based on the separation of production processes into segments, each with specific energy consumption. These segments, which are defined for equipment according to the possible operational states, are called EnergyBlocks. Each EnergyBlock describes the energy consumed and has a fixed or variable duration. A fixed duration results from operational states which last the shortest time technically possible, for example a machine start process. Variable durations represent operational states, whose length are dependant of the production task. Examples are manufacturing processes. The energy consumption of one block is mathematically described using power series. The energy consumption profile of a planned, not yet realized production process is modeled by arranging the EnergyBlocks to sequences. Depending on when the developed planning system is applied in the process of manufacturing and factory planning, energy consumption prognosis can be calculated as a power profile or as total consumption values, using the same model for both cases. Thus, the information density can be chosen

  9. Hierarchical 3D ZnIn2S4/graphene nano-heterostructures: their in situ fabrication with dual functionality in solar hydrogen production and as anodes for lithium ion batteries.

    Science.gov (United States)

    Kale, Sayali B; Kalubarme, Ramchandra S; Mahadadalkar, Manjiri A; Jadhav, Harsharaj S; Bhirud, Ashwini P; Ambekar, Jalinder D; Park, Chan-Jin; Kale, Bharat B

    2015-12-21

    Hierarchical 3D ZnIn2S4/graphene (ZnIn2S4/Gr) nano-heterostructures were successfully synthesized using an in-situ hydrothermal method. The dual functionality of these nano-heterostructures i.e. for solar hydrogen production and lithium ion batteries has been demonstrated for the first time. The ZnIn2S4/Gr nano-heterostructures were optimized by varying the concentrations of graphene for utmost hydrogen production. An inspection of the structure shows the existence of layered hexagonal ZnIn2S4 wrapped in graphene. The reduction of graphene oxide (GO) to graphene was confirmed by Raman and XPS analyses. The morphological analysis demonstrated that ultrathin ZnIn2S4 nanopetals are dispersed on graphene sheets. The optical study reveals the extended absorption edge to the visible region due to the presence of graphene and hence is used as a photocatalyst to transform H2S into eco-friendly hydrogen using solar light. The ZnIn2S4/Gr nano-heterostructure that is comprised of graphene and ZnIn2S4 in a weight ratio of 1 : 99 exhibits enhanced photocatalytically stable hydrogen production i.e. ∼6365 μmole h(-1) under visible light irradiation using just 0.2 g of nano-heterostructure, which is much higher as compared to bare hierarchical 3D ZnIn2S4. The heightened photocatalytic activity is attributed to the enhanced charge carrier separation due to graphene which acts as an excellent electron collector and transporter. Furthermore, the usage of nano-heterostructures and pristine ZnIn2S4 as anodes in lithium ion batteries confers the charge capacities of 590 and 320 mA h g(-1) after 220 cycles as compared to their initial reversible capacities of 645 and 523 mA h g(-1), respectively. These nano-heterostructures show high reversible capacity, excellent cycling stability, and high-rate capability indicating their potential as promising anode materials for LIBs. The excellent performance is due to the nanostructuring of ZnIn2S4 and the presence of a graphene layer, which

  10. Current products and future plan of regulatory research for risk-informed regulation in Korea

    International Nuclear Information System (INIS)

    Sung, Key Yong; Lee, Chang Ju; Kim, Woong Sik; Kim, Hho Jung

    2003-01-01

    The first phase of a regulatory research project for risk-informed regulation (RIR) and applications (RIA) was finished in March of 2002. Various results that could be useful for preparing Korean RIR system have been developed. One of the remarkable outputs is development of reactor safety goals and acceptance criteria for RIR and RIA in Korea. The Safety Goal has a 4-tier hierarchical structure and each tier has specified goals classified for their usage. Regulatory review guides for probabilistic safety assessment (PSA) including level-1, level-2 and low power and shutdown PSA have been updated by reflecting new information obtained from not only the overseas documents but also experience and insights from regulatory review in Korea. In addition, draft regulatory guides for risk-informed in-service inspection, in-service testing, importance ranking of motor-operated valves, and AOT/STI change of Technical Specifications have been developed for preparing ongoing and future licensing work. Risk-based inspection guides with inspection items selected from a viewpoint of risk importance have been suggested for Korean standard NPPs as well. In the second phase of a research project (April of 2002 to March of 2005), two regulatory research projects on RIR were initiated. One is a study on institutionalization of risk-informed and performance-based regulation. Main topics of this project are evaluation of benefit and characteristics of RIR, development of optimized Korean RIR model, impact analysis for the change of current regulation framework, and suggestion of RIR-related laws and rules. The other is focusing on the development in the areas of a regulatory audit PSA model and regulatory guides for risk monitoring, and application techniques of risk information to the significance determination of plant performance indicators and inspection findings. It is expected that a concrete scheme and detailed regulatory techniques for embodiment of RIR system in Korea will be

  11. The virtual maintenance system: a computer-based support tool for robust design, product monitoring, fault diagnosis and maintenance planning

    NARCIS (Netherlands)

    van Houten, Frederikus J.A.M.; Kimura, F.

    2000-01-01

    Digital (geometric) product models can be used for maintainability analysis and maintenance planning. It is not feasible to build digital product models for maintenance purposes only, but if a digital product model is available, it may be used to support many maintenance-related engineering tasks.

  12. Inter-subject variability modulates phonological advance planning in the production of adjective-noun phrases.

    Science.gov (United States)

    Michel Lange, Violaine; Laganaro, Marina

    2014-01-01

    The literature on advance phonological planning in adjective-noun phrases (NPs) presents diverging results: while many experimental studies suggest that the entire NP is encoded before articulation, other results favor a span of encoding limited to the first word. Although cross-linguistic differences in the structure of adjective-NPs may account for some of these contrasting results, divergences have been reported even among similar languages and syntactic structures. Here we examined whether inter-individual differences account for variability in the span of phonological planning in the production of French NPs, where previous results indicated encoding limited to the first word. The span of phonological encoding is tested with the picture-word interference (PWI) paradigm using phonological distractors related to the noun or to the adjective of the NPs. In Experiment 1, phonological priming effects were limited to the first word in adjective NPs whichever the position of the adjective (pre-nominal or post-nominal). Crucially, phonological priming effects on the second word interacted with speakers' production speed suggesting different encoding strategies for participants. In Experiment 2, we tested this hypothesis further with a larger group of participants. Results clearly showed that slow and fast initializing participants presented different phonological priming patterns on the last element of adjective-NPs: while the first word was primed by a distractor for all speakers, only the slow speaker group presented a priming effect on the second element of the NP. These results show that the span of phonological encoding is modulated by inter-individual strategies: in experimental paradigms some speakers plan word by word whereas others encode beyond the initial word. We suggest that the diverging results reported in the literature on advance phonological planning may partly be reconciled in light of the present results.

  13. Revised Master Plan for the Hood River Production Program, Technical Report 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Oregon Department of Fish and Wildlife; Confederated Tribes of the Warm Springs Reservation

    2008-04-28

    The Hood River Production Program (HRPP) is a Bonneville Power Administration (BPA) funded program initiated as a mitigation measure for Columbia River hydrosystem effects on anadromous fish. The HRPP began in the early 1990s with the release of spring Chinook and winter steelhead smolts into the basin. Prior to implementation, co-managers, including the Confederated Tribes of the Warm Springs Reservation and the Oregon Department of Fish and Wildlife drafted the Hood River Production Master Plan (O'Toole and ODFW 1991a; O'Toole and ODFW 1991b) and the Pelton Ladder Master Plan (Smith and CTWSR 1991). Both documents were completed in 1991 and subsequently approved by the Council in 1992 and authorized through a BPA-led Environmental Impact Statement in 1996. In 2003, a 10-year programmatic review was conducted for BPA-funded programs in the Hood River (Underwood et al. 2003). The primary objective of the HRPP Review (Review) was to determine if program goals were being met, and if modifications to program activities would be necessary in order to meet or revise program goals. In 2003, an agreement was signed between PacifiCorp and resource managers to remove the Powerdale Dam (RM 10) and associated adult trapping facility by 2010. The HRPP program has been dependant on the adult trap to collect broodstock for the hatchery programs; therefore, upon the dam's removal, some sort of replacement for the trap would be needed to continue the HRPP. At the same time the Hood River Subbasin Plan (Coccoli 2004) was being written and prompted the co-managers to considered future direction of the program. This included revising the numerical adult fish objectives based on the assimilated data and output from several models run on the Hood River system. In response to the Review as well as the Subbasin Plan, and intensive monitoring and evaluation of the current program, the HRPP co-managers determined the spring Chinook program was not achieving the HRPP

  14. Product assurance planning in an environment of increased need for accountability

    Science.gov (United States)

    Esparza, V.; Casey, C.

    1991-10-01

    Projects producing data are too often providing a product that is neither defensible nor usable. Instead of planning for data of known and required quality, managers are too often asking for (and getting) the wrong thing. The problem is a lack of correct planning strategy. A planning strategy to produce usable, defensible data requires communication from the customer to top-level management and from top-level management to the project leader, who must then communicate with the technical experts who will run the project. EPA requires that data quality objectives (DQOs) be derived for RI/FS projects. The DQO process is a top-down planning process that requires two-way communication; some organizations do not have structures suited for implementing DQOs as mandated by EPA. This paper discusses specific tools for imposing structure that will make the DQO process easier to follow for many organizations. The tools include a steering committee, a test design team, and Quality Function Deployment (QFD) matrices. The steering committee is a strong technical forum that can develop technical issues systematically and break down technical issues into manageable pieces that can be stated as test objectives. The test design team plans each test, systematically designs the test matrix, and guides the completion of test documentation that will be used to defend the data collected. QFD matrices are used as tools by both steering committee and test design team as a highly structured, systematic means of relating top-level (customer) requirements to data quality needs and measurement system design.

  15. Status and Planning of South Africa's Nuclear Hydrogen Production Program

    Energy Technology Data Exchange (ETDEWEB)

    Ravenswaay, J. P.; Niekerk, F.; Kriek, R. J.; Blom, E.; Krieg, H. M.; Niekerk, W. M. K.; Merwe, F.; Vosloo, H. C. M. [North-West University, Potchefstroom (South Africa)

    2009-05-15

    In May 2007 the South African Cabinet approved a National Hydrogen and Fuel Cell Technologies R and D and Innovation Strategy. The Strategy will focus on research, development and innovation for (amongst others) by building on the existing knowledge in High Temperature Gas Cooled Reactors (HTGR) and coal gasification Fischer-Tropsch technology, to develop local cost-competitive hydrogen production methods. As part of the roll-out strategy, the South African Department of Science and Technology (DST) created three Competence Centers (CC), including a Hydrogen Infrastructure Competence Centre hosted by the North-West University (NWU) and the Council for Scientific and Industrial Research (CSIR). The Hydrogen Infrastructure CC is tasked with developing Hydrogen Production, Storage, Distribution as well as Codes and Standards programs within the framework of the DST strategic objectives. A 700kW Heliostat field is to be constructed at the CSIR. It is planned that the following processes will be investigated there: Steam Methane Reforming, High Temperature Steam Electrolysis, Metal-oxide redox process. At the NWU the main focus will be on the large scale, CO{sub 2} free, hydrogen production through thermo-chemical water splitting using nuclear heat from a suitable heat source such as a HTGR. The following will be investigated: Plasma-arc reforming of methane, Investigating the integration of a HTGR with a coal-to-liquid process, steel manufacture and ammonia production, The Hybrid-Sulphur process for the production of hydrogen.

  16. Planning for Production of Freshwater Fish Fry in a Variable Climate in Northern Thailand.

    Science.gov (United States)

    Uppanunchai, Anuwat; Apirumanekul, Chusit; Lebel, Louis

    2015-10-01

    Provision of adequate numbers of quality fish fry is often a key constraint on aquaculture development. The management of climate-related risks in hatchery and nursery management operations has not received much attention, but is likely to be a key element of successful adaptation to climate change in the aquaculture sector. This study explored the sensitivities and vulnerability of freshwater fish fry production in 15 government hatcheries across Northern Thailand to climate variability and evaluated the robustness of the proposed adaptation measures. This study found that hatcheries have to consider several factors when planning production, including: taking into account farmer demand; production capacity of the hatchery; availability of water resources; local climate and other area factors; and, individual species requirements. Nile tilapia is the most commonly cultured species of freshwater fish. Most fry production is done in the wet season, as cold spells and drought conditions disrupt hatchery production and reduce fish farm demand in the dry season. In the wet season, some hatcheries are impacted by floods. Using a set of scenarios to capture major uncertainties and variability in climate, this study suggests a couple of strategies that should help make hatchery operations more climate change resilient, in particular: improving hatchery operations and management to deal better with risks under current climate variability; improving monitoring and information systems so that emerging climate-related risks are known sooner and understood better; and, research and development on alternative species, breeding programs, improving water management and other features of hatchery operations.

  17. Production and Maintenance Planning for a Deteriorating System with Operation-Dependent Defectives

    Directory of Open Access Journals (Sweden)

    Héctor Rivera-Gómez

    2018-01-01

    Full Text Available This paper provides new insights to the area of sustainable manufacturing systems at analyzing the novel paradigm of integrated production logistics, quality, and maintenance design. For this purpose, we investigate the optimal production and repair/major maintenance switching strategy of an unreliable deteriorating manufacturing system. The effects of the deterioration process are mainly observed on the failure intensity and on the quality of the parts produced, where the rate of defectives depends on the production rate. When unplanned failures occur, either a minimal repair or a major maintenance could be conducted. The integration of availability and quality deterioration led us to propose a new stochastic dynamic programming model where optimality conditions are derived through the Hamilton-Jacobi-Bellman equations. The model defined the joint production and repair/major maintenance switching strategies minimizing the total cost over an infinite planning horizon. In the results, the influence of the deterioration process were evident in both the production and maintenances control parameters. A numerical example and an extensive sensitivity analysis were conducted to illustrate the usefulness of the results. Finally, the proposed control policy was compared with alternative strategies based on common assumptions of the literature in order to illustrate its efficiency.

  18. Utah ITS/CVO business plan : using technology to maximize highway safety and improve government and industry productivity

    Science.gov (United States)

    1997-12-31

    This plan was produced to maximize highway safety and increase government and industry productivity through the application of Intelligent Transportation System/Commercial Vehicle Operations (ITS/CVO) technologies to support regulatory and enforcemen...

  19. Planning and tracking chemotherapy production for cancer treatment: a performing and integrated solution.

    Science.gov (United States)

    Kergosien, Y; Tournamille, J-F; Laurence, B; Billaut, J-C

    2011-09-01

    Chemotherapy drugs are intended for the treatment of cancer. The production of such drugs and their administration to the patient is a delicate and expensive operation. The study deals with the acquisition and processing of data regarding the production of intravenous chemotherapy, from the production request (the medical prescription), the production itself (pharmaceutical process), to the delivery in the health care unit, for the administration of the chemotherapy. The goal of this study is to develop a system that can schedule, control and track the chemotherapy preparations and satisfy a certification process of quality management ("ISO 9001 version 2000" standard). The solution proposed in this paper was developed within the framework of a common certification process at the Biopharmaceutical Unit of the Oncology Clinic (UBCO) of the Bretonneau hospital in Tours (France). The system consists of two software programs: a software to insure traceability and a decision making software to plan the production. To simplify the data entry process, some mobile entry points with bar code reader have been deployed. These tools enable an accurate tracking of the production, a security and control for the schedule production phases, and a full traceability of each operation leading to the administration of the chemotherapy drug. The first result is a software that creates the production schedule, allows a real time control of the production process and a full traceability of each step. Computational experiments are based on real data sets, with a comparison of a time period before and after the implementation of this solution. The results show the positive impacts of this software, like the reduction of delayed deliveries, real time generation of production indicators, optimization of the production and a saving of staff time. This intuitive system guarantees a traceability in connection with a high quality system certified ISO 9001-v2000 (with a rapid data entry), an

  20. Hierarchical unilamellar vesicles of controlled compositional heterogeneity.

    Directory of Open Access Journals (Sweden)

    Maik Hadorn

    Full Text Available Eukaryotic life contains hierarchical vesicular architectures (i.e. organelles that are crucial for material production and trafficking, information storage and access, as well as energy production. In order to perform specific tasks, these compartments differ among each other in their membrane composition and their internal cargo and also differ from the cell membrane and the cytosol. Man-made structures that reproduce this nested architecture not only offer a deeper understanding of the functionalities and evolution of organelle-bearing eukaryotic life but also allow the engineering of novel biomimetic technologies. Here, we show the newly developed vesicle-in-water-in-oil emulsion transfer preparation technique to result in giant unilamellar vesicles internally compartmentalized by unilamellar vesicles of different membrane composition and internal cargo, i.e. hierarchical unilamellar vesicles of controlled compositional heterogeneity. The compartmentalized giant unilamellar vesicles were subsequently isolated by a separation step exploiting the heterogeneity of the membrane composition and the encapsulated cargo. Due to the controlled, efficient, and technically straightforward character of the new preparation technique, this study allows the hierarchical fabrication of compartmentalized giant unilamellar vesicles of controlled compositional heterogeneity and will ease the development of eukaryotic cell mimics that resemble their natural templates as well as the fabrication of novel multi-agent drug delivery systems for combination therapies and complex artificial microreactors.

  1. Improving productivity and profitability of a bioanalytical business through sales and operation planning.

    Science.gov (United States)

    Islam, Rafiqul

    2013-07-01

    Today's bioanalytical CROs face increasing global competition, highly variable demand, high fixed costs, pricing pressure, and increasing demand for quality and speed. Most bioanalytical laboratories have responded to these challenges by implementing automation and by implementing process improvement methodologies (e.g., Six Sigma). These solutions have not resulted in a significant improvement in productivity and profitability since none of them are able to predict the upturn or downturn in demand. High volatility of demand causes long lead times and high costs during peak demand and poor productivity during trough demand. Most bioanalytical laboratories lack the tools to align supply efficiently to meet changing demand. In this paper, sales and operation planning (S&OP) has been investigated as a tool to balance supply and demand. The S&OP process, when executed effectively, can be the single greatest determinant of profitability for a bioanalytical business.

  2. The segment as the minimal planning unit in speech production and reading aloud: evidence and implications.

    Science.gov (United States)

    Kawamoto, Alan H; Liu, Qiang; Kello, Christopher T

    2015-01-01

    Speech production and reading aloud studies have much in common, especially the last stages involved in producing a response. We focus on the minimal planning unit (MPU) in articulation. Although most researchers now assume that the MPU is the syllable, we argue that it is at least as small as the segment based on negative response latencies (i.e., response initiation before presentation of the complete target) and longer initial segment durations in a reading aloud task where the initial segment is primed. We also discuss why such evidence was not found in earlier studies. Next, we rebut arguments that the segment cannot be the MPU by appealing to flexible planning scope whereby planning units of different sizes can be used due to individual differences, as well as stimulus and experimental design differences. We also discuss why negative response latencies do not arise in some situations and why anticipatory coarticulation does not preclude the segment MPU. Finally, we argue that the segment MPU is also important because it provides an alternative explanation of results implicated in the serial vs. parallel processing debate.

  3. Hierarchical Discriminant Analysis

    Directory of Open Access Journals (Sweden)

    Di Lu

    2018-01-01

    Full Text Available The Internet of Things (IoT generates lots of high-dimensional sensor intelligent data. The processing of high-dimensional data (e.g., data visualization and data classification is very difficult, so it requires excellent subspace learning algorithms to learn a latent subspace to preserve the intrinsic structure of the high-dimensional data, and abandon the least useful information in the subsequent processing. In this context, many subspace learning algorithms have been presented. However, in the process of transforming the high-dimensional data into the low-dimensional space, the huge difference between the sum of inter-class distance and the sum of intra-class distance for distinct data may cause a bias problem. That means that the impact of intra-class distance is overwhelmed. To address this problem, we propose a novel algorithm called Hierarchical Discriminant Analysis (HDA. It minimizes the sum of intra-class distance first, and then maximizes the sum of inter-class distance. This proposed method balances the bias from the inter-class and that from the intra-class to achieve better performance. Extensive experiments are conducted on several benchmark face datasets. The results reveal that HDA obtains better performance than other dimensionality reduction algorithms.

  4. Hierarchical Linked Views

    Energy Technology Data Exchange (ETDEWEB)

    Erbacher, Robert; Frincke, Deb

    2007-07-02

    Coordinated views have proven critical to the development of effective visualization environments. This results from the fact that a single view or representation of the data cannot show all of the intricacies of a given data set. Additionally, users will often need to correlate more data parameters than can effectively be integrated into a single visual display. Typically, development of multiple-linked views results in an adhoc configuration of views and associated interactions. The hierarchical model we are proposing is geared towards more effective organization of such environments and the views they encompass. At the same time, this model can effectively integrate much of the prior work on interactive and visual frameworks. Additionally, we expand the concept of views to incorporate perceptual views. This is related to the fact that visual displays can have information encoded at various levels of focus. Thus, a global view of the display provides overall trends of the data while focusing in on individual elements provides detailed specifics. By integrating interaction and perception into a single model, we show how one impacts the other. Typically, interaction and perception are considered separately, however, when interaction is being considered at a fundamental level and allowed to direct/modify the visualization directly we must consider them simultaneously and how they impact one another.

  5. 18th ICPR paper: Master Production Scheduling and A Comparision of Material Requirements Planning and Cover-Time Planning

    OpenAIRE

    2006-01-01

    Abstract For a company?s long-term profitability, most important processes are the way it starts parts of the manufacturing process before the customer order arrives and the way it determines and promises delivery quantities and times for the customer orders. In practical computer applications Material Requirement Planning and/or Reorder point systems are the base techniques mostly used. This article pre?sents Cover-Time Planning, a variant of a reorder point system. Cover-Time Pla...

  6. [How to carry out work on family planning after adopting production responsibility systems in rural areas].

    Science.gov (United States)

    Xiao, S H

    1982-05-29

    After the Third Meeting of the Eleventh People's Congress, the entire responsibility for agricultural production was transferred to a lower level. Peasants in various areas have adopted the so called production responsibility system, and the phenomenon of an increased population rate has also appeared in some areas. In this article, the author discusses how to solve these problems created by the new situation. The 1st step is try to control population growth through socialist propaganda education, administrative measures, economic incentives and punishments, and family planning work. The 2nd step is to popularize the practice of having only 1 child per household in the rural areas. The 2nd and 3rd child in each family should be controlled and prohibited. This policy formulated by the Central Government should be carried out thoroughly. Families which follow the policy and have only 1 child should be encouraged with economic rewards, and those families which have 2 or more children should be punished economically. The 3rd step is to establish a national work team to be in charge of family planning and birth control. There should be an ideological unity among the nation's leadership. Party members and cadres should establish themselves as good examples for the people so that the population control work may become successful.

  7. Application of the Extended Theory of Planned Behavior Model to Investigate Purchase Intention of Green Products among Thai Consumers

    OpenAIRE

    Kamonthip Maichum; Surakiat Parichatnon; Ke-Chung Peng

    2016-01-01

    Green products are among the widely used products worldwide due to their environmental benefits. However, information on the consumers’ purchase intention towards green products in developing countries, such as Thailand, is lacking. This study aims to investigate Thai consumers who are aged over 18 years, and whose base education is high school, on purchase intention for green products by using an extended framework of the theory of planned behavior (TPB). We derived and examined the model th...

  8. Transuranium Processing Plant semiannual report of production, status, and plans for period ending December 31, 1976

    International Nuclear Information System (INIS)

    King, L.J.; Bigelow, J.E.; Collins, E.D.

    1977-10-01

    During the period July 1, 1976, through December 31, 1976, transuranium elements were obtained from 11 irradiated HFIR targets; products recovered are 0.3 g 243 Am, 16.6 g 244 Cm, 23 g 249 Bk, 211 g 252 Cf, 1.15 mg 253 Es, and 0.4 pg 247 Fm. Two batches of high-purity 248 Cm were purified chemically for shipment, and another batch containing about 62 mg of 248 Cm was separated from 252 Cf. Thirty shipments were made from TRU during the period; recipients and the amounts of nuclides are listed in tabular form. Nine HFIR targets, each containing 8 to 9 g of curium, were fabricated. The sequence of chemical processing steps used to purify the californium product was changed; this change yielded a shorter recovery time for high-purity 253 Es, which enabled a 50% increase in the amount obtained. Eight neutron sources were fabricated during this report period, bringing the total fabricated to date to 92. Three sources that had previously been returned to TRU were reassigned; two others are also available for reassignment. The values currently being used for transuranium element decay data and for cross-section data in planning irradiation-processing cycles, calculating production forecasts, and assaying products are tabulated in the Appendix

  9. Simulation model for improved production planning and control through quality, cycle time and batch size management

    Directory of Open Access Journals (Sweden)

    Kotevski Živko

    2015-01-01

    Full Text Available Production planning and control (PPC systems are the base of all production facilities. In today's surroundings, having a good PPC system generates lots of benefits for the companies. But, having an excellent PPC system provides great competitive advantage and serious reduction of cost in many fields. In order to get to a point of having excellent PPC, the companies turn more and more to the newest software tools, for simulations as an example. Considering today's advanced computer technology, by using the simulations in this area, companies will have strong asset when dealing with different kinds of wastes, delays, overstock, bottlenecks and generally loss of time. This model is applicable in almost all production facilities. Taking into account the different scrap percentages for the pieces that form the end product, a detailed model and analysis were made in order to determine the optimal starting parameters. At first all the conditions of the company were determined, conceptual model was created along with all assumptions. Then the model was verified and validated and at the end a cost benefit analysis was conducted in order to have clear results.

  10. Computer-aided process planning in prismatic shape die components based on Standard for the Exchange of Product model data

    Directory of Open Access Journals (Sweden)

    Awais Ahmad Khan

    2015-11-01

    Full Text Available Insufficient technologies made good integration between the die components in design, process planning, and manufacturing impossible in the past few years. Nowadays, the advanced technologies based on Standard for the Exchange of Product model data are making it possible. This article discusses the three main steps for achieving the complete process planning for prismatic parts of the die components. These three steps are data extraction, feature recognition, and process planning. The proposed computer-aided process planning system works as part of an integrated system to cover the process planning of any prismatic part die component. The system is built using Visual Basic with EWDraw system for visualizing the Standard for the Exchange of Product model data file. The system works successfully and can cover any type of sheet metal die components. The case study discussed in this article is taken from a large design of progressive die.

  11. Direct hierarchical assembly of nanoparticles

    Science.gov (United States)

    Xu, Ting; Zhao, Yue; Thorkelsson, Kari

    2014-07-22

    The present invention provides hierarchical assemblies of a block copolymer, a bifunctional linking compound and a nanoparticle. The block copolymers form one micro-domain and the nanoparticles another micro-domain.

  12. Hierarchical materials: Background and perspectives

    DEFF Research Database (Denmark)

    2016-01-01

    Hierarchical design draws inspiration from analysis of biological materials and has opened new possibilities for enhancing performance and enabling new functionalities and extraordinary properties. With the development of nanotechnology, the necessary technological requirements for the manufactur...

  13. MULTIPLE CRITERIA DECISION MAKING IN STRATEGIC PLANNING OF TABLE EGG PRODUCTION

    Directory of Open Access Journals (Sweden)

    Ana Crnčan

    2016-06-01

    Full Text Available The main research objective was to analyze and evaluate different systems of table egg production by using the multiple criteria analysis, the method of Analytic Hierarchy Process (AHP in decision making within strategic planning of production. The survey involved 79 producers of table eggs registered in the Records on laying hens’ farms in the Republic of Croatia. In the first stage, the research defined the criteria and sub-criteria for system evaluation which were compared in pairs in order to determine the weight or importance for each of them. Alternatives were evaluation based on definition of priorities of examinees and the extent to which they meet each of the defined criteria and sub-criteria. Intensity of examinees’ preferences were entered into the Expert Choice software in order to evaluate ranking results of egg production systems. Defined model consisted of a quantitative criterion of economic indicators, and the other two referred to qualitative criteria, market indicators and technical-technological factors. Each criterion had its corresponding sub-criteria that were evenly distributed in numerical order. Based on individual assessments of the examinees, overall cumulative evaluation was obtained for the table egg production systems. Accordingly, the most acceptable alternative to egg production is the indoor keeping system (priority 0.301. It is followed by the free-range system of keeping laying hens (priority 0.253. The third-ranked alternative is egg production by hens kept in conventional cages (priority 0.226, while the fourth-ranked least acceptable alternative, as of the total evaluation, is the ecological system of egg production (priority 0.220. Taking into account the obtained results of multiple criteria evaluation as well as EU and world trends in changing consumers’ habits including food safety and quality as well as customers’ preferences towards local market and local products, it is recommended that eggs

  14. Two levels decision system for efficient planning and implementation of bioenergy production

    International Nuclear Information System (INIS)

    Ayoub, Nasser; Martins, Ricardo; Wang, Kefeng; Seki, Hiroya; Naka, Yuji

    2007-01-01

    When planning bioenergy production from biomass, planners should take into account each and every stakeholder along the biomass supply chains, e.g. biomass resources suppliers, transportation, conversion and electricity suppliers. Also, the planners have to consider social concerns, environmental and economical impacts related with establishing the biomass systems and the specific difficulties of each country. To overcome these problems in a sustainable manner, a robust decision support system is required. For that purpose, a two levels general Bioenergy Decision System (gBEDS) for bioenergy production planning and implementation was developed. The core part of the gBEDS is the information base, which includes the basic bioenergy information and the detailed decision information. Basic bioenergy information include, for instance, the geographical information system (GIS) database, the biomass materials' database, the biomass logistic database and the biomass conversion database. The detailed decision information considers the parameters' values database with their default values and the variables database, values obtained by simulation and optimization. It also includes a scenario database, which is used for demonstration to new users and also for case based reasoning by planners and executers. Based on the information base, the following modules are included to support decision making: the simulation module with graph interface based on the unit process (UP) definition and the genetic algorithms (GAs) methods for optimal decisions and the Matlab module for applying data mining methods (fuzzy C-means clustering and decision trees) to the biomass collection points, to define the location of storage and bioenergy conversion plants based on the simulation and optimization model developed of the whole life cycle of bioenergy generation. Furthermore, Matlab is used to set up a calculation model with crucial biomass planning parameters (e.g. costs, CO 2 emissions), over

  15. Hierarchical architecture of active knits

    International Nuclear Information System (INIS)

    Abel, Julianna; Luntz, Jonathan; Brei, Diann

    2013-01-01

    Nature eloquently utilizes hierarchical structures to form the world around us. Applying the hierarchical architecture paradigm to smart materials can provide a basis for a new genre of actuators which produce complex actuation motions. One promising example of cellular architecture—active knits—provides complex three-dimensional distributed actuation motions with expanded operational performance through a hierarchically organized structure. The hierarchical structure arranges a single fiber of active material, such as shape memory alloys (SMAs), into a cellular network of interlacing adjacent loops according to a knitting grid. This paper defines a four-level hierarchical classification of knit structures: the basic knit loop, knit patterns, grid patterns, and restructured grids. Each level of the hierarchy provides increased architectural complexity, resulting in expanded kinematic actuation motions of active knits. The range of kinematic actuation motions are displayed through experimental examples of different SMA active knits. The results from this paper illustrate and classify the ways in which each level of the hierarchical knit architecture leverages the performance of the base smart material to generate unique actuation motions, providing necessary insight to best exploit this new actuation paradigm. (paper)

  16. Transuranium Processing Plant semiannual report of production, status, and plans for period ending December 31, 1975

    International Nuclear Information System (INIS)

    King, L.J.; Bigelow, J.E.; Collins, E.D.

    1976-10-01

    Between July 1, 1975, and December 31, 1975, maintenance was conducted at TRU for a period of three months, 295 g of curium oxide (enough for approximately 26 HFIR targets) were prepared, 100 mg of high-purity 248 Cm, were separated from 252 Cf that had been purified during earlier periods, 11 HFIR targets were fabricated, and 28 product shipments were made. No changes were made in the chemical processing flowsheets normally used at TRU during this report period. However, three equipment racks were replaced (with two new racks) during this time. In Cubicle 6, the equipment replaced was that used to decontaminate the transplutonium elements from rare earth fission products and to separate curium from the heavier elements by means of the LiCl-based anion-exchange process. In Cubicle 5, the equipment used to separate the transcurium elements by high-pressure ion exchange and to purify berkelium by batch solvent extraction was replaced. Two neutron sources were fabricated, bringing the total fabricated to 79. One source that had been used in a completed project was returned to the TRU inventory and is available for reissue. Three sources, for which no further use was foreseen, were processed to isolate and recover the ingrown 248 Cm and the residual 252 Cf. Eight pellets, each containing 100 μg of high-purity 248 Cm were prepared for irradiation in HFIR to study the production of 250 Cm. The values currently being used for transuranium element decay data and for cross-section data in planning irradiation-processing cycles, calculating production forecasts, and assaying products are tabulated

  17. Ontological Planning

    Directory of Open Access Journals (Sweden)

    Ahmet Alkan

    2017-12-01

    • Is it possible to redefine ontology within the hierarchical structure of planning? We are going to seek answers to some of these questions within the limited scope of this paper and we are going to offer the rest for discussion by just asking them. In light of these assessments, drawing attention, based on ontological knowledge relying on the wholeness of universe, to the question, on macro level planning, of whether or not the ontological realities of man, energy and movements of thinking can provide macro data for planning on a universal level as important factors affecting mankind will be one of the limited objectives of the paper.

  18. Understanding safety and production risks in rail engineering planning and protection.

    Science.gov (United States)

    Wilson, John R; Ryan, Brendan; Schock, Alex; Ferreira, Pedro; Smith, Stuart; Pitsopoulos, Julia

    2009-07-01

    Much of the published human factors work on risk is to do with safety and within this is concerned with prediction and analysis of human error and with human reliability assessment. Less has been published on human factors contributions to understanding and managing project, business, engineering and other forms of risk and still less jointly assessing risk to do with broad issues of 'safety' and broad issues of 'production' or 'performance'. This paper contains a general commentary on human factors and assessment of risk of various kinds, in the context of the aims of ergonomics and concerns about being too risk averse. The paper then describes a specific project, in rail engineering, where the notion of a human factors case has been employed to analyse engineering functions and related human factors issues. A human factors issues register for potential system disturbances has been developed, prior to a human factors risk assessment, which jointly covers safety and production (engineering delivery) concerns. The paper concludes with a commentary on the potential relevance of a resilience engineering perspective to understanding rail engineering systems risk. Design, planning and management of complex systems will increasingly have to address the issue of making trade-offs between safety and production, and ergonomics should be central to this. The paper addresses the relevant issues and does so in an under-published domain - rail systems engineering work.

  19. Transuranium processing plant semiannual report of production, status, and plans for period ending December 31, 1974

    International Nuclear Information System (INIS)

    King, L.J.; Bigelow, J.E.; Collins, E.D.

    1975-07-01

    During the period July 1, 1974, through December 31, 1974, the following amounts of transuranium elements were recovered from 11 irradiated HFIR targets: 1.5 g 243 Am, 45 g 244 Cm, 24 mg 249 Bk, 252 mg 252 Cf, 1.25 mg 253 Es, and 0.5 pg 257 Fm. In addition, 34 mg of high-purity 248 Cm was separated from 252 Cf which had been recovered and purified during earlier periods. Nine HFIR targets, each containing 8 to 9 g of actinides (predominantly curium), were fabricated. Some of the chemical processing steps used for processing HFIR targets were added, deleted, or rearranged in order to reduce processing time and increase product yields. One cubicle equipment rack was replaced and the out-of-cell piping and equipment associated with the remotely operated valves in the TRU cubicles was revised. One neutron source was fabricated. Three sources that had been used previously in various projects and returned to TRU were reloaned. A special project was begun to recover 126 Sn from TRU process solutions. The values currently in use for transuranium element decay data and for cross-section data in planning irradiation-processing cycles, calculating production forecasts, and assaying products are tabulated in the Appendix. (U.S.)

  20. Transuranium processing plant semiannual report of production, status, and plans for period ending December 31, 1977

    International Nuclear Information System (INIS)

    King, L.J.; Bigelow, J.E.; Collins, E.D.

    1978-08-01

    Transuranium elements were obtained from 13 irradiated HFIR targets. One batch of high-purity 248 Cm (approximately 75 mg) was separated from 252 Cf. Eighteen shipments were made from TRU during the period. Seven HFIR targets, each containing 8 to 9 g of curium, were fabricated. A new scrubber system was installed in the dissolver off-gas (DOG) stream to remove the bulk of the 131 I and to reduce the amount sorbed in the Hopcalite--charcoal system. During TRU target Campaign 53, the DOG stream was scrubbed with hyperazeotropic nitric acid (the IODOX process). Both the equipment and the process performed satisfactorily. Three neutron sources were fabricated during this report period, bringing the total fabricated to date to 100. Six sources were returned to TRU and are available for reassignment. Special projects included the production of several grams of ultrahigh-purity 243 Am and the development of a method for purification of the ZnBr 2 solution from a shielding window. The values currently being used for transuranium element decay data and for cross-section data in planning irradiation-processing cycles, calculating production forecasts, and assaying products are tabulated

  1. Effective production planning for purchased part under long lead time and uncertain demand: MRP Vs demand-driven MRP

    Science.gov (United States)

    Shofa, M. J.; Moeis, A. O.; Restiana, N.

    2018-04-01

    MRP as a production planning system is appropriate for the deterministic environment. Unfortunately, most production systems such as customer demands are stochastic, so that MRP is inappropriate at the time. Demand-Driven MRP (DDMRP) is new approach for production planning system dealing with demand uncertainty. The objective of this paper is to compare the MRP and DDMRP for purchased part under long lead time and uncertain demand in terms of average inventory levels. The evaluation is conducted through a discrete event simulation with the long lead time and uncertain demand scenarios. The next step is evaluating the performance of DDMRP by comparing the inventory level of DDMRP with MRP. As result, DDMRP is more effective production planning than MRP in terms of average inventory levels.

  2. Integrated load distribution and production planning in series-parallel multi-state systems with failure rate depending on load

    International Nuclear Information System (INIS)

    Nourelfath, Mustapha; Yalaoui, Farouk

    2012-01-01

    A production system containing a set of machines (also called components) arranged according to a series-parallel configuration is addressed. A set of products must be produced in lots on this production system during a specified finite planning horizon. This paper presents a method for integrating load distribution decisions, and tactical production planning considering the costs of capacity change and the costs of unused capacity. The objective is to minimize the sum of capacity change costs, unused capacity costs, setup costs, holding costs, backorder costs, and production costs. The main constraints consist in satisfying the demand for all products over the entire horizon, and in not exceeding available repair resource. The production series-parallel system is modeled as a multi-state system with binary-state components. The proposed model takes into account the dependence of machines' failure rates on their load. Universal generating function technique can be used in the optimization algorithm for evaluating the expected system production rate in each period. We show how the formulated problem can be solved by comparing the results of several multi-product lot-sizing problems with capacity associated costs. The importance of integrating load distribution decisions and production planning is illustrated through numerical examples.

  3. FRESHWATER FISH FARMING CONDITIONS IN 1999 AND THE PRODUCTION PLAN FOR 2000

    Directory of Open Access Journals (Sweden)

    Zlatko Homen

    2000-09-01

    Full Text Available One of the activities of the Ministry of Agriculture and Forestry, Fishery and Mediterranean Agriculture Directorate, i. e. Fishery Directorate to be more specific, is the monitoring of conditions in freshwater fish farming. The objective of this work is to show conditions in freshwater fish farming during 1999. and to provide a production plan for 2000. It will also provide detailed insight into the present conditions in freshwater fish farming and into the production trends of this field. Regarding this issue, the »Questionnaire for the Monitoring of Conditions in Freshwater Fish Farming«, was sent to fish farmers aroud the country data was processed from 22 cap ponds and 13 trout ponds. Roughe estimates of conditions were conducted for 2 fish farms, since they haven’t yet returned the mandatoruy questionnaire, i. e. the necessary data. This work features data on the number of employees in fish farms, as well as their qualifications, on the actual production and distribution of farmed freshwater fish, on the areas where production was conducted and on the overall yield. Fish food, raw materials, used tools and incentive funds paid were also taken into consideration. The difficulties faced in this branch of the economy are also inicated. Compared to 1998, a slight decrease in the number of employees of freshwater fish farms has been recorded. The total number of employees in 1999 was 655, of which 555 were on carp ponds and 100 on trout ponds. Data on the qualifications of employees for 1999 show that most of them were unskilled workers, while highly skilled workers make up a minority in this work force. The total production of freshwater in 1999. amoounted to 6.185,51 tons. Of this amount 5.592,52 tons were warm-water fish specied and 592,99 tons were cold-water fish species. Compared to 1998, production decreased by 4,89 percent. Production for 2000 has been planned to increase by 22,15 percent, i. e. the production quantity is projected

  4. Operational Readiness Review Plan for the Radioisotope Thermoelectric Generator Materials Production Tasks

    Science.gov (United States)

    Cooper, R. H.; Martin, M. M.; Riggs, C. R.; Beatty, R. L.; Ohriner, E. K.; Escher, R. N.

    1990-04-19

    In October 1989, a US shuttle lifted off from Cape Kennedy carrying the spacecraft Galileo on its mission to Jupiter. In November 1990, a second spacecraft, Ulysses, will be launched from Cape Kennedy with a mission to study the polar regions of the sun. The prime source of power for both spacecraft is a series of radioisotope thermoelectric generators (RTGs), which use plutonium oxide (plutonia) as a heat source. Several of the key components in this power system are required to ensure the safety of both the public and the environment and were manufactured at Oak Ridge National Laboratory (ORNL) in the 1980 to 1983 period. For these two missions, Martin Marietta Energy Systems, Inc. (Energy Systems), will provide an iridium alloy component used to contain the plutonia heat source and a carbon composite material that serves as a thermal insulator. ORNL alone will continue to fabricate the carbon composite material. Because of the importance to DOE that Energy Systems deliver these high quality components on time, performance of an Operational Readiness Review (ORR) of these manufacturing activities is necessary. Energy Systems Policy GP 24 entitled "Operational Readiness Process" describes the formal and comprehensive process by which appropriate Energy Systems activities are to be reviewed to ensure their readiness. This Energy System policy is aimed at reducing the risks associated with mission success and requires a management approved "readiness plan" to be issued. This document is the readiness plan for the RTG materials production tasks.

  5. [Investigating phonological planning processes in speech production through a speech-error induction technique].

    Science.gov (United States)

    Nakayama, Masataka; Saito, Satoru

    2015-08-01

    The present study investigated principles of phonological planning, a common serial ordering mechanism for speech production and phonological short-term memory. Nakayama and Saito (2014) have investigated the principles by using a speech-error induction technique, in which participants were exposed to an auditory distracIor word immediately before an utterance of a target word. They demonstrated within-word adjacent mora exchanges and serial position effects on error rates. These findings support, respectively, the temporal distance and the edge principles at a within-word level. As this previous study induced errors using word distractors created by exchanging adjacent morae in the target words, it is possible that the speech errors are expressions of lexical intrusions reflecting interactive activation of phonological and lexical/semantic representations. To eliminate this possibility, the present study used nonword distractors that had no lexical or semantic representations. This approach successfully replicated the error patterns identified in the abovementioned study, further confirming that the temporal distance and edge principles are organizing precepts in phonological planning.

  6. Optimization-based guidelines to retirement planning and pension product design

    DEFF Research Database (Denmark)

    Konicz Bell, Agnieszka Karolina

    their retirement savings, this thesis presents some optimization techniques that could be applied by pension providers and financial advisers to provide individuals with such guidelines. For a given objective function and a number of constraints, we search for the optimal solution, which indicates, for example...... investigate the optimal annuity choice under inflation risk, which is often ignored both by practitioners advising on the retirement planning and by scholars investigating the consumption-investment problems. We search for an optimal level of retirement income in real terms, given investment opportunities...... in inflation-linked, nominal, and variable annuities, as well as in stocks and bonds. Our findings show that real annuities are a crucial asset in every portfolio, and that trying to hedge inflation without investing in inflation-linked products leads to a lower and more volatile retirement income. In the last...

  7. Experiment Plan of High Temperature Steam and Carbon dioxide Co-electrolysis for Synthetic Gas Production

    International Nuclear Information System (INIS)

    Yoon, Duk-Joo; Ko, Jae-Hwa

    2008-01-01

    Currently, Solid oxide fuel cells (SOFC) come into the spotlight in the middle of the energy technologies of the future for highly effective conversion of fossil fuels into electricity without carbon dioxide emission. The SOFC is a reversible cell. By applying electrical power to the cell, which is solid oxide electrolysis cell (SOEC), it is possible to produce synthetic gas (syngas) from high temperature steam and carbon dioxide. The produced syngas (hydrogen and carbon monoxide) can be used for synthetic fuels. This SOEC technology can use high temperature from VHTRs for high efficiency. This paper describes KEPRI's experiment plan of high temperature steam and carbon co-electrolysis for syngas production using SOEC technology

  8. Development and planning of plant for the high-pressure extraction of natural products

    Energy Technology Data Exchange (ETDEWEB)

    Eggers, R; Tschiersch, R [Thyssen Industrie A.G., Witten (Germany, F.R.)

    1978-11-01

    Important criteria in the designing of plant for the recovery of carrier or extract are reviewed, especially for the extraction of natural products with supercritical CO/sub 2/. The quantities to be determined in the planning of a large-scale plant are outlined and a typical process, the extraction of spices, is discussed in detail. The plant components and assemblies are presented together with their particular process engineering and construction characteristics. Finally, the thermodynamic aspects are dealt with in more detail and ways of optimizing a large-scale plant and reducing the power consumption are outlined. Particular attention is paid to the question of optimization regarding the most economic method of operation of such a plant in the future.

  9. Optimizing a Biobjective Production-Distribution Planning Problem Using a GRASP

    Directory of Open Access Journals (Sweden)

    Martha-Selene Casas-Ramírez

    2018-01-01

    Full Text Available This paper addresses a biobjective production-distribution planning problem. The problem is formulated as a mixed integer programming problem with two objectives. The objectives are to minimize the total costs and to balance the total workload of the supply chain, which consist of plants and depots, considering that it represents a company vertically integrated. In order to solve the model, we propose an adapted biobjective GRASP to obtain an approximation of the Pareto front. To evaluate the performance of the proposed algorithm, numerical experimentations are conducted over a set of instances used for similar problems. Results indicate that the proposed GRASP obtains a relatively small number of nondominated solutions for each tested instance in very short computational time. The approximated Pareto fronts are discontinuous and nonconvex. Moreover, the solutions clearly show the compromise between both objective functions.

  10. Simulation as a planning tool for job-shop production environment

    Science.gov (United States)

    Maram, Venkataramana; Nawawi, Mohd Kamal Bin Mohd; Rahman, Syariza Abdul; Sultan, Sultan Juma

    2015-12-01

    In this paper, we made an attempt to use discrete event simulation software ARENA® as a planning tool for job shop production environment. We considered job shop produces three types of Jigs with different sequence of operations to study and improve shop floor performance. The sole purpose of the study is to identifying options to improve machines utilization, reducing job waiting times at bottleneck machines. First, the performance of the existing system was evaluated by using ARENA®. Then identified improvement opportunities by analyzing base system results. Second, updated the model with most economical options. The proposed new system outperforms with that of the current base system by 816% improvement in delay times at paint shop by increase 2 to 3 and Jig cycle time reduces by Jig1 92%, Jig2 65% and Jig3 41% and hence new proposal was recommended.

  11. Urban pattern: Layout design by hierarchical domain splitting

    KAUST Repository

    Yang, Yongliang; Wang, Jun; Vouga, Etienne; Wonka, Peter

    2013-01-01

    We present a framework for generating street networks and parcel layouts. Our goal is the generation of high-quality layouts that can be used for urban planning and virtual environments. We propose a solution based on hierarchical domain splitting using two splitting types: streamline-based splitting, which splits a region along one or multiple streamlines of a cross field, and template-based splitting, which warps pre-designed templates to a region and uses the interior geometry of the template as the splitting lines. We combine these two splitting approaches into a hierarchical framework, providing automatic and interactive tools to explore the design space.

  12. Urban pattern: Layout design by hierarchical domain splitting

    KAUST Repository

    Yang, Yongliang

    2013-11-06

    We present a framework for generating street networks and parcel layouts. Our goal is the generation of high-quality layouts that can be used for urban planning and virtual environments. We propose a solution based on hierarchical domain splitting using two splitting types: streamline-based splitting, which splits a region along one or multiple streamlines of a cross field, and template-based splitting, which warps pre-designed templates to a region and uses the interior geometry of the template as the splitting lines. We combine these two splitting approaches into a hierarchical framework, providing automatic and interactive tools to explore the design space.

  13. Hierarchical Multiple Markov Chain Model for Unsupervised Texture Segmentation

    Czech Academy of Sciences Publication Activity Database

    Scarpa, G.; Gaetano, R.; Haindl, Michal; Zerubia, J.

    2009-01-01

    Roč. 18, č. 8 (2009), s. 1830-1843 ISSN 1057-7149 R&D Projects: GA ČR GA102/08/0593 EU Projects: European Commission(XE) 507752 - MUSCLE Institutional research plan: CEZ:AV0Z10750506 Keywords : Classification * texture analysis * segmentation * hierarchical image models * Markov process Subject RIV: BD - Theory of Information Impact factor: 2.848, year: 2009 http://library.utia.cas.cz/separaty/2009/RO/haindl-hierarchical multiple markov chain model for unsupervised texture segmentation.pdf

  14. PLAN 98 - Costs for management of the radioactive waste from nuclear power production

    International Nuclear Information System (INIS)

    1998-06-01

    The nuclear utilities in Sweden are responsible for managing and disposing of spent nuclear fuel and radioactive waste from the nuclear power reactors in a safe manner. The most important measures are to plan, build and operate the facilities and systems needed, and to conduct related R and D. This report presents a calculation of the costs for implementing all of these measures. The following facilities and systems are in operation: Transportation system for radioactive waste products. Central interim storage facility for spent nuclear fuel, CLAB. Final repository for radioactive operational waste, SFR I. Plans also exist for: Encapsulation plant for spent nuclear fuel. Deep repository for spent fuel and other long-lived waste. Final repository for decommissioning waste. The cost calculations also include costs for research, development and demonstration, as well as for decommissioning and dismantling the reactor plants etc. At the end of 1995, certain amendments were made in the Financing Act which influence the calculations presented in this report. The most important amendment is that the reactor owners, besides paying a fee or charge on nuclear energy production, must also give guarantees as security for remaining costs. In this way the fee can be based on a probable cost for waste management. This cost includes uncertainties and variations that are normal for this type of project. Cost increases as a consequence of major changes, disruptions etc. can instead be covered via the given guarantees. The total future costs, in January 1998 prices, for the Swedish waste management system from 1999 onward has been calculated to be SEK 45.8 billion. The total costs apply for the waste obtained from 25 years of operation of all Swedish reactors. They will fall due over a total period of approximately 50 years up to the middle of the 2l st century, but the greater part will fall due during the next 20 years. It is estimated that SEK 12.1 billion in current money terms

  15. Production planning of combined heat and power plants with regards to electricity price spikes : A machine learning approach

    OpenAIRE

    Fransson, Nathalie

    2017-01-01

    District heating systems could help manage the expected increase of volatility on the Nordic electricity market by starting a combined heat and power production plant (CHP) instead of a heat only production plant when electricity prices are expected to be high. Fortum Värme is interested in adjusting the production planning of their district heating system more towards high electricity prices and in their system there is a peak load CHP unit that could be utilised for this purpose. The econom...

  16. A New View at the Planning Marketing Popular Products: Exploratory Study Electronics Sector with Companies in Brazil.

    OpenAIRE

    Evange Elias Assis; Francisco Antonio Serralvo; Karen Perrotta Lopes de Almeida Prado

    2015-01-01

    The increased consumption of appliance and electronic products by lower-income population represented a growth opportunity for companies in the sector. The overall objective of this paper is to investigate how appliance and electronic product manufacturers draw up their marketing planning for low-end products. An exploratory approach was taken in this study, comprising the literature review and the empirical research which was conducted in two stages by combining the qualitative and quantitat...

  17. Hierarchical Bass model

    International Nuclear Information System (INIS)

    Tashiro, Tohru

    2014-01-01

    We propose a new model about diffusion of a product which includes a memory of how many adopters or advertisements a non-adopter met, where (non-)adopters mean people (not) possessing the product. This effect is lacking in the Bass model. As an application, we utilize the model to fit the iPod sales data, and so the better agreement is obtained than the Bass model

  18. Hierarchical Bass model

    Science.gov (United States)

    Tashiro, Tohru

    2014-03-01

    We propose a new model about diffusion of a product which includes a memory of how many adopters or advertisements a non-adopter met, where (non-)adopters mean people (not) possessing the product. This effect is lacking in the Bass model. As an application, we utilize the model to fit the iPod sales data, and so the better agreement is obtained than the Bass model.

  19. Project To Design a Marketing Plan for Promoting Educators' Awareness of and Access to ERIC Products. Proposed Marketing Plan.

    Science.gov (United States)

    Contemporary Associates, Inc., Washington, DC.

    The proposed strategy, which is designed to maximize the effectiveness and minimize the costs of marketing the Information Analysis Products (IAPs) produced by the 16 ERIC Clearinghouses, is based on a study of the concept of centralized versus decentralized ordering of selected ERIC products. The experiment measured four variables--postage,…

  20. A New View at the Planning Marketing Popular Products: Exploratory Study Electronics Sector with Companies in Brazil.

    Directory of Open Access Journals (Sweden)

    Evange Elias Assis

    2015-06-01

    Full Text Available The increased consumption of appliance and electronic products by lower-income population represented a growth opportunity for companies in the sector. The overall objective of this paper is to investigate how appliance and electronic product manufacturers draw up their marketing planning for low-end products. An exploratory approach was taken in this study, comprising the literature review and the empirical research which was conducted in two stages by combining the qualitative and quantitative approaches. The study group comprised companies affiliated with National Association of Appliance and Electronic Product Manufacturers (ELETROS. Results indicate that in 87.5% of cases the marketing planning focuses on the product. The companies are concerned to differentiate the low-end products on the market mainly by design (87.5% and innovation (62.5%. Within this context, it seems that the opportunity for growth of the appliance and electronic product companies can be boosted when implementing specific marketing planning for low-end products. Innovation is needed in all processes from project design of the product to its distribution. 

  1. Automated plant, production management system

    Science.gov (United States)

    Aksenova, V. I.; Belov, V. I.

    1984-12-01

    The development of a complex of tasks for the operational management of production (OUP) within the framework of an automated system for production management (ASUP) shows that it is impossible to have effective computations without reliable initial information. The influence of many factors involving the production and economic activity of the entire enterprise upon the plan and course of production are considered. It is suggested that an adequate model should be available which covers all levels of the hierarchical system: workplace, section (bridgade), shop, enterprise, and the model should be incorporated into the technological sequence of performance and there should be provisions for an adequate man machine system.

  2. Joint Optimal Production Planning for Complex Supply Chains Constrained by Carbon Emission Abatement Policies

    Directory of Open Access Journals (Sweden)

    Longfei He

    2014-01-01

    Full Text Available We focus on the joint production planning of complex supply chains facing stochastic demands and being constrained by carbon emission reduction policies. We pick two typical carbon emission reduction policies to research how emission regulation influences the profit and carbon footprint of a typical supply chain. We use the input-output model to capture the interrelated demand link between an arbitrary pair of two nodes in scenarios without or with carbon emission constraints. We design optimization algorithm to obtain joint optimal production quantities combination for maximizing overall profit under regulatory policies, respectively. Furthermore, numerical studies by featuring exponentially distributed demand compare systemwide performances in various scenarios. We build the “carbon emission elasticity of profit (CEEP” index as a metric to evaluate the impact of regulatory policies on both chainwide emissions and profit. Our results manifest that by facilitating the mandatory emission cap in proper installation within the network one can balance well effective emission reduction and associated acceptable profit loss. The outcome that CEEP index when implementing Carbon emission tax is elastic implies that the scale of profit loss is greater than that of emission reduction, which shows that this policy is less effective than mandatory cap from industry standpoint at least.

  3. Multi-Working Modes Product-Color Planning Based on Evolutionary Algorithms and Swarm Intelligence

    Directory of Open Access Journals (Sweden)

    Man Ding

    2010-01-01

    Full Text Available In order to assist designer in color planning during product development, a novel synthesized evaluation method is presented to evaluate color-combination schemes of multi-working modes products (MMPs. The proposed evaluation method considers color-combination images in different working modes as evaluating attributes, to which the corresponding weights are assigned for synthesized evaluation. Then a mathematical model is developed to search for optimal color-combination schemes of MMP based on the proposed evaluation method and two powerful search techniques known as Evolution Algorithms (EAs and Swarm Intelligence (SI. In the experiments, we present a comparative study for two EAs, namely, Genetic Algorithm (GA and Difference Evolution (DE, and one SI algorithm, namely, Particle Swarm Optimization (PSO, on searching for color-combination schemes of MMP problem. All of the algorithms are evaluated against a test scenario, namely, an Arm-type aerial work platform, which has two working modes. The results show that the DE obtains the superior solution than the other two algorithms for color-combination scheme searching problem in terms of optimization accuracy and computation robustness. Simulation results demonstrate that the proposed method is feasible and efficient.

  4. Critical care medicine as a distinct product line with substantial financial profitability: the role of business planning.

    Science.gov (United States)

    Bekes, Carolyn E; Dellinger, R Phillip; Brooks, Daniel; Edmondson, Robert; Olivia, Christopher T; Parrillo, Joseph E

    2004-05-01

    As academic health centers face increasing financial pressures, they have adopted a more businesslike approach to planning, particularly for discrete "product" or clinical service lines. Since critical care typically has been viewed as a service provided by a hospital, and not a product line, business plans have not historically been developed to expand and promote critical care. The major focus when examining the finances of critical care has been cost reduction, not business development. We hypothesized that a critical care business plan can be developed and analyzed like other more typical product lines and that such a critical care product line can be profitable for an institution. In-depth analysis of critical care including business planning for critical care services. Regional academic health center in southern New Jersey. None. As part of an overall business planning process directed by the Board of Trustees, the critical care product line was identified by isolating revenue, expenses, and profitability associated with critical care patients. We were able to identify the major sources ("value chain") of critical care patients: the emergency room, patients who are admitted for other problems but spend time in a critical care unit, and patients transferred to our intensive care units from other hospitals. The greatest opportunity to expand the product line comes from increasing the referrals from other hospitals. A methodology was developed to identify the revenue and expenses associated with critical care, based on the analysis of past experience. With this model, we were able to demonstrate a positive contribution margin of dollar 7 million per year related to patients transferred to the institution primarily for critical care services. This can be seen as the profit related to the product line segment of critical care. There was an additional positive contribution margin of dollar 5.8 million attributed to the critical care portion of the hospital stay of

  5. Hierarchical magnetic petal-like Fe3O4-ZnO@g-C3N4 for removal of sulfamethoxazole, suppression of photocorrosion, by-products identification and toxicity assessment.

    Science.gov (United States)

    Mirzaei, Amir; Chen, Zhi; Haghighat, Fariborz; Yerushalmi, Laleh

    2018-08-01

    Herein, a petal-like photocatalyst, Fe 3 O 4 -ZnO@g-C 3 N 4 (FZG) with different g-C 3 N 4 to ZnO ratios was synthesized with hierarchical structure. The FZG1 photocatalyst, having the weight ratio of 1:1 for the initial urea and Fe 3 O 4 -ZnO (Fe-ZnO), presented the highest sulfamethoxazole (SMX) degradation rate of 0.0351 (min -1 ), which was 2.6 times higher than that of pristine ZnO. Besides the facile separation, the performance of photocatalyst was improved due to the function of iron oxide as an electron acceptor that reduced the electron/hole recombination rate. The coating of g-C 3 N 4 on the Fe-ZnO surface not only acted as a protective layer for ZnO against photocorrosion, but it also enhanced the photocatalytic activity of the catalyst for SMX degradation through the heterojunction mechanism. By using the FZG1 photocatalyst, 95% SMX removal was obtained after 90 min reaction, while 47% COD and 30% TOC removal were achieved after 60 min treatment under a low energy-consuming UV lamp (10 W). Moreover, a substantial reduction in the solution toxicity was shown after the treatment, as compared with the SMX solution before treatment. The LC-HR-MS/MS analysis results showed that the concentration of most detected by-products produced after 90 min reaction by FZG1 was considerably lower than those obtained using other synthesized photocatalysts. By performing radical scavenging experiments, OH ° radical was found to be the major reactive species. The FZG1 photocatalyst also displayed excellent reusability in five cycles and the leaching of zinc and iron ions was reduced by 54% and ∼100%, respectively, after coating Fe-ZnO with g-C 3 N 4 . Copyright © 2018 Elsevier Ltd. All rights reserved.

  6. 78 FR 59754 - Notice of Application for Approval of Railroad Safety Program Plan and Product Safety Plan

    Science.gov (United States)

    2013-09-27

    ... crewmembers or roadway workers. It does so while increasing railroad productivity and significantly improving... the document, if submitted on behalf of an association, business, labor union, etc.). See http://www...

  7. Transuranium Processing Plant semiannual report of production, status, and plans for period ending June 30, 1975

    Energy Technology Data Exchange (ETDEWEB)

    King, L.J.; Bigelow, J.E.; Collins, E.D.

    1976-03-01

    During the period January 1, 1975, through June 30, 1975, the following amounts of transuranium elements were recovered from 22 irradiated HFIR targets: 2g /sup 243/Am, 59 g /sup 244/Cm, 51 mg /sup 249/Bk, 465 mg /sup 252/Cf, 2.5 mg /sup 253/Es, and 1.4 pg /sup 257/Fm. In addition, 45 mg of high-purity /sup 248/Cm was operated from /sup 252/Cf which had been recovered and purified during earlier periods, and 56 mg of a lower-quality /sup 248/Cm was separated from californium purification rework solutions. Five HFIR targets, each containing approximately 9 g of actinides (predominantly curium), were fabricated. A new long-term projection showed that /sup 252/Cf production in the TRU-HFIR complex could increase to as much as 2.5 g/year. During the next 18 months, we expect to recover totals of 46 mg of /sup 249/Bk, 520 mg of /sup 252/Cf, 2.0 mg of /sup 253/Es (in a mixture of isotopes), 220 ..mu..g of high-purity /sup 253/Es, and 1.6 pg of /sup 257/Fm. We also expect to obtain 125 mg of high-purity /sup 248/Cm from purified californium now in storage. There are no plans to process any of the remaining SRP Pu-Al tubes or to irradiate any plutonium targets in the HFIR; thus, we do not expect to recover any /sup 244/Pu. No changes were made in the chemical processing flowsheets normally used at TRU. Two neutron sources were fabricated, bringing the total fabricated to 77. In special projects, we (1) produced about 1 mg of /sup 250/Cf by irradiation of /sup 249/Bk in HFIR rabbits, and (2) processed some irradiated /sup 248/Cm samples and obtained yield and isotopic composition data for use in determining the capture cross section of /sup 249/Cm in the HFIR. The values that are currently being used for transuranium element decay data and for cross-section data in planning irradiation-processing cycles, calculating production forecasts, and assaying products are tabulated in the Appendix.

  8. Transuranium Processing Plant semiannual report of production, status, and plans for period ending June 30, 1975

    International Nuclear Information System (INIS)

    King, L.J.; Bigelow, J.E.; Collins, E.D.

    1976-03-01

    During the period January 1, 1975, through June 30, 1975, the following amounts of transuranium elements were recovered from 22 irradiated HFIR targets: 2g 243 Am, 59 g 244 Cm, 51 mg 249 Bk, 465 mg 252 Cf, 2.5 mg 253 Es, and 1.4 pg 257 Fm. In addition, 45 mg of high-purity 248 Cm was operated from 252 Cf which had been recovered and purified during earlier periods, and 56 mg of a lower-quality 248 Cm was separated from californium purification rework solutions. Five HFIR targets, each containing approximately 9 g of actinides (predominantly curium), were fabricated. A new long-term projection showed that 252 Cf production in the TRU-HFIR complex could increase to as much as 2.5 g/year. During the next 18 months, we expect to recover totals of 46 mg of 249 Bk, 520 mg of 252 Cf, 2.0 mg of 253 Es (in a mixture of isotopes), 220 μg of high-purity 253 Es, and 1.6 pg of 257 Fm. We also expect to obtain 125 mg of high-purity 248 Cm from purified californium now in storage. There are no plans to process any of the remaining SRP Pu-Al tubes or to irradiate any plutonium targets in the HFIR; thus, we do not expect to recover any 244 Pu. Two neutron sources were fabricated, bringing the total fabricated to 77. Two sources that had been used previously in various projects were returned to the TRU inventory and are available for reassignment. In special projects, we (1) produced about 1 mg of 250 Cf by irradiation of 249 Bk in HFIR rabbits, and (2) processed some irradiated 248 Cm samples and obtained yield and isotopic composition data for use in determining the capture cross section of 249 Cm in the HFIR. The values that are currently being used for transuranium element decay data and for cross-section data in planning irradiation-processing cycles, calculating production forecasts, and assaying products are tabulated in the Appendix

  9. Implementation plan for the new production reactor capacity environmental impact statement

    International Nuclear Information System (INIS)

    1989-12-01

    The US Department of Energy (DOE) proposed to site, construct, and operate new production reactor (NPR) capacity intended primarily to produce tritium and secondarily to produce plutonium for the US nuclear weapons program. DOE studies show that this new capacity is needed to ensure reliable maintenance of the nation's nuclear weapons stockpile. It also is essential that these necessary nuclear materials be produced in a safe and environmentally sound manner. The DOE has determined that this proposed action constitutes a major federal action that may significantly affect the quality of the human environment; therefore, the DOE will prepare an environmental impact statement (EIS) to assess the potential impacts of the proposed action and reasonable alternatives on the human and natural environment. The EIS will be prepared in accordance with the National Environmental Policy Act of 1969, as implemented in regulations promulgated by the Council on Environmental Quality (CEQ). This EIS implementation plan (IP) includes a description of the proposed action, descriptions of alternatives, a summary of EIS assumptions, a list of environmental issues to be considered in the EIS (including those identified during public scoping activities), a list of proposed agency consultations, a schedule for EIS preparation and related activities, and an annotated outline for the EIS. It is the Department's intent that the EIS on the NPR capacity will serve as the programmatic National Environmental Policy Act (NEPA) review of modernization of DOE defense nuclear materials production of tritium and plutonium. The Department is currently developing a NEPA compliance strategy for modernization of the remainder of the nuclear weapons production complex, which will reference the EIS on NPR capacity. 7 refs., 8 tabs

  10. Microbiological sampling plan based on risk classification to verify supplier selection and production of served meals in food service operation.

    Science.gov (United States)

    Lahou, Evy; Jacxsens, Liesbeth; Van Landeghem, Filip; Uyttendaele, Mieke

    2014-08-01

    Food service operations are confronted with a diverse range of raw materials and served meals. The implementation of a microbial sampling plan in the framework of verification of suppliers and their own production process (functionality of their prerequisite and HACCP program), demands selection of food products and sampling frequencies. However, these are often selected without a well described scientifically underpinned sampling plan. Therefore, an approach on how to set-up a focused sampling plan, enabled by a microbial risk categorization of food products, for both incoming raw materials and meals served to the consumers is presented. The sampling plan was implemented as a case study during a one-year period in an institutional food service operation to test the feasibility of the chosen approach. This resulted in 123 samples of raw materials and 87 samples of meal servings (focused on high risk categorized food products) which were analyzed for spoilage bacteria, hygiene indicators and food borne pathogens. Although sampling plans are intrinsically limited in assessing the quality and safety of sampled foods, it was shown to be useful to reveal major non-compliances and opportunities to improve the food safety management system in place. Points of attention deduced in the case study were control of Listeria monocytogenes in raw meat spread and raw fish as well as overall microbial quality of served sandwiches and salads. Copyright © 2014 Elsevier Ltd. All rights reserved.

  11. Combined heat and power production planning in a waste-to-energy plant on a short-term basis

    International Nuclear Information System (INIS)

    Touš, Michal; Pavlas, Martin; Putna, Ondřej; Stehlík, Petr; Crha, Lukáš

    2015-01-01

    In many cases, WtE (waste-to-energy) plants are CHP (combined heat and power) producers. They are often integrated into a central heating system and they also export electricity to the grid. Therefore, they have to plan their operation on a long-term basis (months, years) as well as on a short-term basis (hours, days). Simulation models can effectively support decision making in CHP production planning. In general, CHP production planning on a short-term basis is a challenging task for WtE plants. This article presents a simulation based support. It is demonstrated on an example involving a real WtE plant. Most of the models of relevant WtE sub-systems (boilers, steam turbine) are developed using operational data and applying linear regression and artificial neural network technique. The process randomness given mainly by fluctuating heating value of waste leads to uncertainty in a calculation of CHP production and a stochastic approach is appropriate. The models of the sub-systems are, therefore, extended of a stochastic part and Monte-Carlo simulation is applied. Compared to the current planning strategy in the involved WtE plant, the stochastic simulation based planning provides increased CHP production resulting in better net thermal efficiency and increased revenue. This is demonstrated through a comparison using real operational data. - Highlights: • Introduction of a stochastic model of a CHP production in a waste-to-energy plant. • An application of the model for the next day CHP production planning. • Better net thermal efficiency and therefore increased revenue achieved.

  12. Deliberate change without hierarchical influence?

    DEFF Research Database (Denmark)

    Nørskov, Sladjana; Kesting, Peter; Ulhøi, John Parm

    2017-01-01

    reveals that deliberate change is indeed achievable in a non-hierarchical collaborative OSS community context. However, it presupposes the presence and active involvement of informal change agents. The paper identifies and specifies four key drivers for change agents’ influence. Originality....../value The findings contribute to organisational analysis by providing a deeper understanding of the importance of leadership in making deliberate change possible in non-hierarchical settings. It points to the importance of “change-by-conviction”, essentially based on voluntary behaviour. This can open the door...

  13. Organization of development of plans of a production association and participation of enterprises and their subdivisions

    Energy Technology Data Exchange (ETDEWEB)

    Gubenko, I V

    1982-01-01

    Experimental development of plans with participation of enterprises and their subdivisions is presented. The method of determining the intensity of the plans of the drilling enterprises is revealed. Data are presented on the use of a computer to develop a technical-industrial financial plan of the enterprise and association.

  14. Policy plan for the early approval for irradiated meat products and the promotion of irradiated meats in market

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Ju Woon [Team for Radiation Food Science and Biotechnology, Advanced Radiation Technology Institute, Korea Atomic Energy Research Institute, Jeongeup (Korea, Republic of); Kim, Wang Geun [Ministry of Education, Science and Technology, Seoul (Korea, Republic of); Kim, Kyong Su [Dept. of Food and Nutrition, Chosun University, Gwangju (Korea, Republic of); Yook, Hong Sun [Dept. of Food and Nutrition, Chungnam National University, Daejeon (Korea, Republic of); Kim, Cheon Jei [Division of Animal Life Science, Konkuk University, Seoul (Korea, Republic of)

    2008-11-15

    The consumption of meat products is gradually being increased by the development of livestock raising technology, industrialized farm management and international trade. This increased consumption also created new market for ready-to-eat and ready-to-cook meat products. However, these convenience meat products can be easily contaminated during the processing and storage by pathogens, and there have been many reported cases of food borne illness by meats. One of the most effective methods for the decontamination of meat products is the radiation technology. Food irradiation was the established, well-recognized and safe sterilization method. Many other countries researched the effect of irradiation on the meat products and approved the irradiation. In this article, the effectiveness, the international acceptance, the economics and the research trend of irradiation on meat products have been reviewed. Also, the policy plans for the early approval of the irradiated meat products in Korea and the promotion policy of irradiated meats in market were discussed.

  15. Policy plan for the early approval for irradiated meat products and the promotion of irradiated meats in market

    International Nuclear Information System (INIS)

    Lee, Ju Woon; Kim, Wang Geun; Kim, Kyong Su; Yook, Hong Sun; Kim, Cheon Jei

    2008-01-01

    The consumption of meat products is gradually being increased by the development of livestock raising technology, industrialized farm management and international trade. This increased consumption also created new market for ready-to-eat and ready-to-cook meat products. However, these convenience meat products can be easily contaminated during the processing and storage by pathogens, and there have been many reported cases of food borne illness by meats. One of the most effective methods for the decontamination of meat products is the radiation technology. Food irradiation was the established, well-recognized and safe sterilization method. Many other countries researched the effect of irradiation on the meat products and approved the irradiation. In this article, the effectiveness, the international acceptance, the economics and the research trend of irradiation on meat products have been reviewed. Also, the policy plans for the early approval of the irradiated meat products in Korea and the promotion policy of irradiated meats in market were discussed

  16. Transuranium Processing Plant semiannual report of production, status, and plans for period ending June 30, 1977

    International Nuclear Information System (INIS)

    King, L.J.; Bigelow, J.E.; Collins, E.D.

    1977-12-01

    During the period January 1, 1977, through June 30, 1977, the following amounts of transuranium elements were recovered from 12 irradiated HFIR targets: 0.1g 243 Am, 21g 244 Cm, 29.5 mg 249 Bk, 288 mg 252 Cf, 1.48 mg 253 Es, and 0.7 pg 257 Fm. One batch of high-purity 248 Cm (approximately 50 mg) was separated from 252 Cf. Twenty-three shipments were made from TRU during the period; recipients and the amounts of nuclides are tabulated. Five HFIR targets, each containing 8 to 9 g of curium, were fabricated. During the next 18 months, we expect to obtain totals of 92 mg of 249 Bk, 910 mg of 252 Cf, 3.8 mg of 253 Es (in a mixture of isotopes), 615 μg of high-purity 253 Es, and 1.6 pg of 257 Fm; we also expect to make available 250 mg of high-purity 248 Cm. No process or equipment changes were made during this report period. Five neutron sources were fabricated during this report period, bringing the total fabricated to date to 97. Two sources that had previously been returned to TRU were reassigned. Special projects included the following: (1) the enrichment of the 244 Pu concentration in 100 mg of plutonium by irradiation to burn out the lighter isotopes, (2) the separation of 245 pg of 254 Cf from 39-hr /sup 254m/Es that was produced by irradiation of 5 μg of 253 Es, and (3) an experimental separation of cerium from the other rare-earth elements in a TRU process waste solution. The values that we are currently using for transuranium element decay data and for cross-section data in planning irradiation-processing cycles, calculating production forecasts, and assaying products are tabulated in the Appendix

  17. A simulation framework for the evaluation of production planning and order management strategies in the sawmilling industry

    OpenAIRE

    Dumetz , Ludwig; Gaudreault , Jonathan; Thomas , André; Marier , Philippe; Lehoux , Nadia; Bril El-Haouzi , Hind

    2015-01-01

    International audience; Raw material heterogeneity, complex transformation processes, and divergent product flowsmake sawmilling operationsdifficult to manage. Most north-American lumber sawmillsapply a make-to-stock production strategy, some accepting/refusing orders according to available-to-promise (ATP) quantities, while a few uses more advanced approaches. This article introduces a simulation framework allowing comparing and evaluatingdifferentproduction planning strategies as well as or...

  18. Modular networks with hierarchical organization

    Indian Academy of Sciences (India)

    Several networks occurring in real life have modular structures that are arranged in a hierarchical fashion. In this paper, we have proposed a model for such networks, using a stochastic generation method. Using this model we show that, the scaling relation between the clustering and degree of the nodes is not a necessary ...

  19. Hierarchical Microaggressions in Higher Education

    Science.gov (United States)

    Young, Kathryn; Anderson, Myron; Stewart, Saran

    2015-01-01

    Although there has been substantial research examining the effects of microaggressions in the public sphere, there has been little research that examines microaggressions in the workplace. This study explores the types of microaggressions that affect employees at universities. We coin the term "hierarchical microaggression" to represent…

  20. Hierarchical processing in the prefrontal cortex in a variety of cognitive domains

    Directory of Open Access Journals (Sweden)

    Hyeon-Ae eJeon

    2014-11-01

    Full Text Available This review scrutinizes several findings on human hierarchical processing within the prefrontal cortex (PFC in diverse cognitive domains. Converging evidence from previous studies has shown that the PFC, specifically Brodmann area (BA 44, may function as the essential region for hierarchical processing across the domains. In language fMRI studies, BA 44 was significantly activated for the hierarchical processing of center-embedded sentences and this pattern of activations was also observed in artificial grammar. The same pattern was observed in the visuo-spatial domain where BA44 was actively involved in the processing of hierarchy for the visual symbol. Musical syntax, which is the rule-based arrangement of musical sets, has also been construed as hierarchical processing as in the language domain such that the activation in BA44 was observed in a chord sequence paradigm. P600 ERP was also engendered during the processing of musical hierarchy. Along with a longstanding idea that a human’s number faculty is developed as a by-product of language faculty, BA44 was closely involved in hierarchical processing in mental arithmetic. This review extended its discussion of hierarchical processing to hierarchical behavior, that is, human action which has been referred to as being hierarchically composed. Several lesion and TMS studies supported the involvement of BA44 for hierarchical processing in the action domain. Lastly, the hierarchical organization of cognitive controls was discussed within the PFC, forming a cascade of top-down hierarchical processes operating along a posterior-to-anterior axis of the lateral PFC including BA44 within the network. It is proposed that PFC is actively involved in different forms of hierarchical processing and specifically BA44 may play an integral role in the process. Taking levels of proficiency and subcortical areas into consideration may provide further insight into the functional role of BA44 for hierarchical

  1. Assembly Line Productivity Assessment by Comparing Optimization-Simulation Algorithms of Trajectory Planning for Industrial Robots

    Directory of Open Access Journals (Sweden)

    Francisco Rubio

    2015-01-01

    Full Text Available In this paper an analysis of productivity will be carried out from the resolution of the problem of trajectory planning of industrial robots. The analysis entails economic considerations, thus overcoming some limitations of the existing literature. Two methodologies based on optimization-simulation procedures are compared to calculate the time needed to perform an industrial robot task. The simulation methodology relies on the use of robotics and automation software called GRASP. The optimization methodology developed in this work is based on the kinematics and the dynamics of industrial robots. It allows us to pose a multiobjective optimization problem to assess the trade-offs between the economic variables by means of the Pareto fronts. The comparison is carried out for different examples and from a multidisciplinary point of view, thus, to determine the impact of using each method. Results have shown the opportunity costs of non using the methodology with optimized time trajectories. Furthermore, it allows companies to stay competitive because of the quick adaptation to rapidly changing markets.

  2. In Situ Vitrification Engineering-Scale Test ES-INEL-4 Product Characterization Test Plan

    International Nuclear Information System (INIS)

    Weidner, J.R.; Stoots, P.R.

    1990-06-01

    In 1987, the Buried Waste Program (BWP) was established within EG ampersand G Idaho, Inc., the prime contractor at INEL. Following the Environmental Restoration guidelines of the Buried Waste Program, the In Situ Vitrification Program is participating in a Remedial Investigation/Feasibility Study (RI/FS) for permanent disposal of INEL waste, in compliance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). This study was requested and is being funded by the Office of Technology Development of the Idaho Operations Office of DOE (DOE-ID). As part of the RI/FS, an in situ vitrification (ISV) scoping study on the treatability of mixed low-level and mixed transuranic-contaminated waste is being performed to determine the applicability of ISV to remediation of waste at SDA. In examination of the ISV process for applicability to SDA waste, this In Situ Vitrification Engineering-Scale Test ES-INEL-4 Product Characterization Test Plan identifies the following: sampling and analysis strategy; sampling procedures; methods to conduct analyses; equipment; and procedures to ensure data quality. 8 refs., 2 tabs

  3. Training Plan in the Artisanal Processing of Banana as a Productive Activity

    Directory of Open Access Journals (Sweden)

    Gladys Esther Valencia Navas

    2017-05-01

    Full Text Available The purpose of this article is centered in the application of a training plan in the artisan processing of the raw material of the cambur like productive activity directed to the farmers of the community El Cobalongo, Altamira Parish of Cáceres Municipio Bolivar, Barinas State. In this sense, the research is oriented under the feasible project modality and will be developed in the following phases: Phase I: Diagnosis, Phase II: Elaboration of the program, Phase III: Feasibility Assessment, Phase IV: Phase V: Evaluation of program impact. The design is field descriptive type so the method to be used is descriptive. The sample will be made up of eighteen (18 producers of cambur of the community mentioned above, to be applied a questionnaire of twenty (20 items, with four alternatives of answer (always, almost always, sometimes and never. The one that will be validated through expert judgment and its reliability will be calculated by calculating the Cronbach alpha coefficient. The data processing will be done as indicated by the criteria to be used for the coding, tabulation and analysis of the information.

  4. Learning strategies in the planning and evaluation phase of image production

    International Nuclear Information System (INIS)

    Larsson, W.; Aspelin, P.; Lundberg, N.

    2013-01-01

    This paper identifies, describes and analyses radiographers' learning strategies in practice. These strategies are particularly important in the light of the great changes in radiology departments and the role of radiographers during the past two decades. With increased responsibility for quality assurance and diagnostic work, radiographers need to develop specific skills over time, which requires learning strategies in practice. The aim of this study is to identify, describe and analyze the learning strategies of novice and experienced radiographers in the planning and evaluation phase of image production. This study found that novice radiographers; use memorization combined with logical reasoning, apply focused observation, selective reading and information-seeking, communicate through: active and attentive listening, asking questions, receiving feedback, discussing problems and speak out loud. Experienced radiographers; use memorization in combination with logical reasoning and predicting, observe discriminating, read selectively, validate information and perform information-seeking. They communicate through: listening analyzing and demanding way, answering questions and providing feed-back and discussing problems. This study concludes that the difference between the learning strategies of novice and experienced radiographers is in the way they apply the strategies rather than the strategies themselves

  5. Big data driven cycle time parallel prediction for production planning in wafer manufacturing

    Science.gov (United States)

    Wang, Junliang; Yang, Jungang; Zhang, Jie; Wang, Xiaoxi; Zhang, Wenjun Chris

    2018-07-01

    Cycle time forecasting (CTF) is one of the most crucial issues for production planning to keep high delivery reliability in semiconductor wafer fabrication systems (SWFS). This paper proposes a novel data-intensive cycle time (CT) prediction system with parallel computing to rapidly forecast the CT of wafer lots with large datasets. First, a density peak based radial basis function network (DP-RBFN) is designed to forecast the CT with the diverse and agglomerative CT data. Second, the network learning method based on a clustering technique is proposed to determine the density peak. Third, a parallel computing approach for network training is proposed in order to speed up the training process with large scaled CT data. Finally, an experiment with respect to SWFS is presented, which demonstrates that the proposed CTF system can not only speed up the training process of the model but also outperform the radial basis function network, the back-propagation-network and multivariate regression methodology based CTF methods in terms of the mean absolute deviation and standard deviation.

  6. Plan 96 - Costs for management of the radioactive waste from nuclear power production

    International Nuclear Information System (INIS)

    1996-06-01

    This report presents a calculation of the costs for implementing all measures needed to manage and dispose of spent nuclear fuel and radioactive wastes from the Swedish nuclear power reactors. The cost calculations include costs for R,D and D as well as for decommissioning and dismantling the reactor plants etc. The following facilities and systems are already in operation: Transportation system for radioactive waste products, Central interim storage facility for spent nuclear fuel, Final repository for radioactive operational wastes. Plans exist for: Encapsulation plant for spent nuclear fuel, Deep repository for spent fuel and other long-lived waste, Final repository for decommissioning waste. The total future costs, in Jan 1996 prices, for the Swedish waste system from 1997 have been calculated to be 42.2 billion SEK (about 6.4 billion USD). The total costs apply for the waste obtained from 25 years of operation of all Swedish reactors. It is estimated that 10.6 billion SEK in current money has been spent through 1996. Costs based on waste quantities from operation of the reactors for 40 years are also reported. 6 refs

  7. Entrepreneurial intention modeling using hierarchical multiple regression

    Directory of Open Access Journals (Sweden)

    Marina Jeger

    2014-12-01

    Full Text Available The goal of this study is to identify the contribution of effectuation dimensions to the predictive power of the entrepreneurial intention model over and above that which can be accounted for by other predictors selected and confirmed in previous studies. As is often the case in social and behavioral studies, some variables are likely to be highly correlated with each other. Therefore, the relative amount of variance in the criterion variable explained by each of the predictors depends on several factors such as the order of variable entry and sample specifics. The results show the modest predictive power of two dimensions of effectuation prior to the introduction of the theory of planned behavior elements. The article highlights the main advantages of applying hierarchical regression in social sciences as well as in the specific context of entrepreneurial intention formation, and addresses some of the potential pitfalls that this type of analysis entails.

  8. Joint optimization of preventive maintenance and spare parts inventory for an optimal production plan with consideration of CO_2 emission

    International Nuclear Information System (INIS)

    Ba, Kader; Dellagi, Sofiene; Rezg, Nidhal; Erray, Walid

    2016-01-01

    This article presents a joint optimization of spare parts inventory and preventive maintenance. While minimizing CO_2 emissions, this approach is based on an optimal production plan achieved thanks to the HMMS model. The process which is studied in this paper only manufactures one type of product. The purpose of the paper is to determine for a random demand over a given period, a cost-effective production plan and a maintenance policy which integrates a spare parts strategy in accordance with environmental requirements and regulations. Our green spare parts management can be defined as a set of actions that are applied in order to decrease the spare parts footprint in its lifetime (Ba et al., 2015) [1]. Indeed, we take into account the spare parts characteristics (new or used) which will be used during maintenance actions (preventive or corrective) to preserve the environment. Consequently, we set up analytical models based on the effect of the production rate on the system deterioration so as to substantially cut the maintenance costs, production costs and CO_2 emissions. To evaluate the performance of our models, we give some illustrative examples. - Highlights: • Establishment of an optimal production plan for a manufacturing process. • Cost-effective maintenance strategy with a green spare parts strategy. • Possibility to choose between used and new spare parts to execute maintenance action.

  9. Subject-Verb Agreement in Children and Adults: Serial or Hierarchical Processing?

    Science.gov (United States)

    Negro, Isabelle; Chanquoy, Lucile; Fayol, Michel; Louis-Sidney, Maryse

    2005-01-01

    Two processes, serial and hierarchical, are generally opposed to account for grammatical encoding in language production. In a developmental perspective, the question addressed here is whether the subject-verb agreement during writing is computed serially, once the words are linearly ordered in the sentence, or hierarchically, as soon as the…

  10. On the Flexibility of Grammatical Advance Planning During Sentence Production: Effects of Cognitive Load on Multiple Lexical Access

    NARCIS (Netherlands)

    Wagner, V.; Jescheniak, J.D.; Schriefers, H.J.

    2010-01-01

    Three picture-word interference experiments addressed the question of whether the scope of grammatical advance planning in sentence production corresponds to some fixed unit or rather is flexible. Subjects produced sentences of different formats under varying amounts of cognitive load. When speakers

  11. On the Flexibility of Grammatical Advance Planning during Sentence Production: Effects of Cognitive Load on Multiple Lexical Access

    Science.gov (United States)

    Wagner, Valentin; Jescheniak, Jorg D.; Schriefers, Herbert

    2010-01-01

    Three picture-word interference experiments addressed the question of whether the scope of grammatical advance planning in sentence production corresponds to some fixed unit or rather is flexible. Subjects produced sentences of different formats under varying amounts of cognitive load. When speakers described 2-object displays with simple…

  12. Examination of the Locus of Positional Effects on Children's Production of Plural -"s": Considerations from Local and Global Speech Planning

    Science.gov (United States)

    Theodore, Rachel M.; Demuth, Katherine; Shattuck-Hufnagel, Stefanie

    2015-01-01

    Purpose: Prosodic and articulatory factors influence children's production of inflectional morphemes. For example, plural -"s" is produced more reliably in utterance-final compared to utterance-medial position (i.e., the positional effect), which has been attributed to the increased planning time in utterance-final position. In previous…

  13. Grammatical Planning Units during Real-Time Sentence Production in Speakers with Agrammatic Aphasia and Healthy Speakers

    Science.gov (United States)

    Lee, Jiyeon; Yoshida, Masaya; Thompson, Cynthia K.

    2015-01-01

    Purpose: Grammatical encoding (GE) is impaired in agrammatic aphasia; however, the nature of such deficits remains unclear. We examined grammatical planning units during real-time sentence production in speakers with agrammatic aphasia and control speakers, testing two competing models of GE. We queried whether speakers with agrammatic aphasia…

  14. Hierarchically structured, nitrogen-doped carbon membranes

    KAUST Repository

    Wang, Hong; Wu, Tao

    2017-01-01

    The present invention is a structure, method of making and method of use for a novel macroscopic hierarchically structured, nitrogen-doped, nano-porous carbon membrane (HNDCMs) with asymmetric and hierarchical pore architecture that can be produced

  15. Measuring and managing radiologist workload: application of lean and constraint theories and production planning principles to planning radiology services in a major tertiary hospital.

    Science.gov (United States)

    MacDonald, Sharyn L S; Cowan, Ian A; Floyd, Richard; Mackintosh, Stuart; Graham, Rob; Jenkins, Emma; Hamilton, Richard

    2013-10-01

    We describe how techniques traditionally used in the manufacturing industry (lean management, the theory of constraints and production planning) can be applied to planning radiology services to reduce the impact of constraints such as limited radiologist hours, and to subsequently reduce delays in accessing imaging and in report turnaround. Targets for imaging and reporting were set aligned with clinical needs. Capacity was quantified for each modality and for radiologists and recorded in activity lists. Demand was quantified and forecasting commenced based on historical referral rates. To try and mitigate the impact of radiologists as a constraint, lean management processes were applied to radiologist workflows. A production planning process was implemented. Outpatient waiting times to access imaging steadily decreased. Report turnaround times improved with the percentage of overnight/on-call reports completed by a 1030 target time increased from approximately 30% to 80 to 90%. The percentage of emergency and inpatient reports completed within one hour increased from approximately 15% to approximately 50% with 80 to 90% available within 4 hours. The number of unreported cases on the radiologist work-list at the end of the working day reduced. The average weekly accuracy for demand forecasts for emergency and inpatient CT, MRI and plain film imaging was 91%, 83% and 92% respectively. For outpatient CT, MRI and plain film imaging the accuracy was 60%, 55% and 77% respectively. Reliable routine weekly and medium to longer term service planning is now possible. Tools from industry can be successfully applied to diagnostic imaging services to improve performance. They allow an accurate understanding of the demands on a service, capacity, and can reliably predict the impact of changes in demand or capacity on service delivery. © 2013 The Royal Australian and New Zealand College of Radiologists.

  16. Measuring and managing radiologist workload: application of lean and constraint theories and production planning principles to planning radiology services in mahjor tertiary hospital

    International Nuclear Information System (INIS)

    MacDonald, Sharyn L.S.; Cowan, Ian A.; Floyd, Richard; Mackintosh, Stuart; Graham, Rob; Jenkins, Emma; Hamilton, Richard

    2013-01-01

    We describe how techniques traditionally used in the manufacturing industry (lean management, the theory of constraints and production planning) can be applied to planning radiology services to reduce the impact of constraints such as limited radiologist hours, and to subsequently reduce delays in accessing imaging and in report turnaround. Targets for imaging and reporting were set aligned with clinical needs. Capacity was quantified for each modality and for radiologists and recorded in activity lists. Demand was quantified and forecasting commenced based on historical referral rates. To try and mitigate the impact of radiologists as a constraint, lean management processes were applied to radiologist workflows. A production planning process was implemented. Outpatient waiting times to access imaging steadily decreased. Report turnaround times improved with the percentage of overnight/on-call reports completed by a 1030 target time increased from approximately 30% to 80 to 90%. The percentage of emergency and inpatient reports completed within one hour increased from approximately 15% to approximately 50% with 80 to 90% available within 4 hours. The number of unreported cases on the radiologist work-list at the end of the working day reduced. The average weekly accuracy for demand forecasts for emergency and inpatient CT, MRI and plain film imaging was 91%, 83% and 92% respectively. For outpatient CT, MRI and plain film imaging the accuracy was 60%, 55% and 77% respectively. Reliable routine weekly and medium to longer term service planning is now possible. Tools from industry can be successfully applied to diagnostic imaging services to improve performance. They allow an accurate understanding of the demands on a service, capacity, and can reliably predict the impact of changes in demand or capacity on service delivery.

  17. The (in)dependence of articulation and lexical planning during isolated word production.

    Science.gov (United States)

    Buz, Esteban; Jaeger, T Florian

    The number of phonological neighbors to a word (PND) can affect its lexical planning and pronunciation. Similar parallel effects on planning and articulation have been observed for other lexical variables, such as a word's contextual predictability. Such parallelism is frequently taken to indicate that effects on articulation are mediated by effects on the time course of lexical planning. We test this mediation assumption for PND and find it unsupported. In a picture naming experiment, we measure speech onset latencies (planning), word durations, and vowel dispersion (articulation). We find that PND predicts both latencies and durations. Further, latencies predict durations. However, the effects of PND and latency on duration are independent: parallel effects do not imply mediation. We discuss the consequences for accounts of lexical planning, articulation, and the link between them. In particular, our results suggest that ease of planning does not explain effects of PND on articulation.

  18. On the flexibility of grammatical advance planning during sentence production: Effects of cognitive load on multiple lexical access.

    Science.gov (United States)

    Wagner, Valentin; Jescheniak, Jörg D; Schriefers, Herbert

    2010-03-01

    Three picture-word interference experiments addressed the question of whether the scope of grammatical advance planning in sentence production corresponds to some fixed unit or rather is flexible. Subjects produced sentences of different formats under varying amounts of cognitive load. When speakers described 2-object displays with simple sentences of the form "the frog is next to the mug," the 2 nouns were found to be lexically-semantically activated to similar degrees at speech onset, as indexed by similarly sized interference effects from semantic distractors related to either the first or the second noun. When speakers used more complex sentences (including prenominal color adjectives; e.g., "the blue frog is next to the blue mug") much larger interference effects were observed for the first than the second noun, suggesting that the second noun was lexically-semantically activated before speech onset on only a subset of trials. With increased cognitive load, introduced by an additional conceptual decision task and variable utterance formats, the interference effect for the first noun was increased and the interference effect for second noun disappeared, suggesting that the scope of advance planning had been narrowed. By contrast, if cognitive load was induced by a secondary working memory task to be performed during speech planning, the interference effect for both nouns was increased, suggesting that the scope of advance planning had not been affected. In all, the data suggest that the scope of advance planning during grammatical encoding in sentence production is flexible, rather than structurally fixed.

  19. Survival of contact processes on the hierarchical group

    Czech Academy of Sciences Publication Activity Database

    Athreya, S.R.; Swart, Jan M.

    2010-01-01

    Roč. 147, č. 3 (2010), s. 529-563 ISSN 0178-8051 R&D Projects: GA ČR GA201/06/1323 Institutional research plan: CEZ:AV0Z10750506 Keywords : contact process * survival * hierarchical group * coupling * renormalization group Subject RIV: BA - General Mathematics Impact factor: 1.590, year: 2010 http://library.utia.cas.cz/separaty/2010/SI/swart-0342729.pdf

  20. Operating Theatre Planning and Scheduling.

    NARCIS (Netherlands)

    Hans, Elias W.; Vanberkel, P.T.; Hall, R.

    2012-01-01

    In this chapter we present a number of approaches to operating theatre planning and scheduling. We organize these approaches hierarchically which serves to illustrate the breadth of problems confronted by researchers. At each hierarchicalplanning level we describe common problems, solution

  1. An analytical hierarchy process and fuzzy inference system tsukamoto for production planning: a review and conceptual research

    Directory of Open Access Journals (Sweden)

    Abdul Talib Bon

    2015-03-01

    Full Text Available Production planning is an area that is very important on the corporate strategy-level decision-making, especially in the manufacturing companies. The problems that often arise in the production planning are the factors that affect the decline of production and uncertainty that often complicate the decision-making in the production process. These factors are derived from the company’s internal and external factors. The purpose of this study is to introduce the Analytical Hierarchy Process as an effective method that can help to determine the priority of the production factors, so as to facilitate and accelerate decision-making. Other than the AHP methods, this paper will introduce the Tsukamoto Fuzzy Inference System as a method that can help to determine how much product to be manufactured by the company using the variables in the form of fuzzy numbers. These methods hopefully can assist in a better decision making process in the production process and manufacturing generally.

  2. An efficient algorithm for bi-objective combined heat and power production planning under the emission trading scheme

    International Nuclear Information System (INIS)

    Rong, Aiying; Figueira, José Rui; Lahdelma, Risto

    2014-01-01

    Highlights: • Define fuel mix setting for the bi-objective CHP environmental/economic dispatch. • Develop an efficient algorithm for constructing the Pareto frontier for the problem. • Time complexity analysis is conducted for the proposed algorithm. • The algorithm is theoretically compared against a traditional algorithm. • The efficiency of the algorithm is justified by numerical results. - Abstract: The growing environmental awareness and the apparent conflicts between economic and environmental objectives turn energy planning problems naturally into multi-objective optimization problems. In the current study, mixed fuel combustion is considered as an option to achieve tradeoff between economic objective (associated with fuel cost) and emission objective (measured in CO 2 emission cost according to fuels and emission allowance price) because a fuel with higher emissions is usually cheaper than one with lower emissions. Combined heat and power (CHP) production is an important high-efficiency technology to promote under the emission trading scheme. In CHP production, the production planning of both commodities must be done in coordination. A long-term planning problem decomposes into thousands of hourly subproblems. In this paper, a bi-objective multi-period linear programming CHP planning model is presented first. Then, an efficient specialized merging algorithm for constructing the exact Pareto frontier (PF) of the problem is presented. The algorithm is theoretically and empirically compared against a modified dichotomic search algorithm. The efficiency and effectiveness of the algorithm is justified

  3. Typical Plan : The Architecture of Labor and the Space of Production

    NARCIS (Netherlands)

    Marullo, F.

    2014-01-01

    In a short essay dealing with the repetitive homogeneity of the Manhattan’s office layouts, Rem Koolhaas defined the term Typical Plan as one of the purest American architectural archetypes. A plan stripped of all its qualities and reduced to a calculated relation between discreet standardised

  4. Strategic Planning for Grapes Product Development in Takestan City Through using SWOT Matrix

    OpenAIRE

    Masoud Rahmani

    2013-01-01

    Achieving development, particularly development in agriculture sector requires principled efficient planning and accurate implementation of the plan. This involves exact awareness of facilities, opportunities, capabilities and constraints in reaching a favorable situation. This study aims at identifying the strategies required for success and development in local and global markets of grapes through using SWOT (Strengths Weaknesses Opportunities Threats) method. It firstly studies the theoret...

  5. Production-logistic system in the aspect of strategies for production planning and control and for logistic customer service

    OpenAIRE

    Łukasz Hadaś; Agnieszka Stachowiak; Piotr Cyplik

    2014-01-01

    Background: The authors made multi-dimensional review of production and logistic strategies in order to prove their coherence in shaping internal and external supply chain. The paper is concluded with definition of production-logistic system as an object of modeling in transformation of business systems of manufacturing companies. Material and methods: The paper is based on analysis of state of the art presented in the literature on the subject of production and logistics strategies. Publ...

  6. Automatic Hierarchical Color Image Classification

    Directory of Open Access Journals (Sweden)

    Jing Huang

    2003-02-01

    Full Text Available Organizing images into semantic categories can be extremely useful for content-based image retrieval and image annotation. Grouping images into semantic classes is a difficult problem, however. Image classification attempts to solve this hard problem by using low-level image features. In this paper, we propose a method for hierarchical classification of images via supervised learning. This scheme relies on using a good low-level feature and subsequently performing feature-space reconfiguration using singular value decomposition to reduce noise and dimensionality. We use the training data to obtain a hierarchical classification tree that can be used to categorize new images. Our experimental results suggest that this scheme not only performs better than standard nearest-neighbor techniques, but also has both storage and computational advantages.

  7. Hierarchical matrices algorithms and analysis

    CERN Document Server

    Hackbusch, Wolfgang

    2015-01-01

    This self-contained monograph presents matrix algorithms and their analysis. The new technique enables not only the solution of linear systems but also the approximation of matrix functions, e.g., the matrix exponential. Other applications include the solution of matrix equations, e.g., the Lyapunov or Riccati equation. The required mathematical background can be found in the appendix. The numerical treatment of fully populated large-scale matrices is usually rather costly. However, the technique of hierarchical matrices makes it possible to store matrices and to perform matrix operations approximately with almost linear cost and a controllable degree of approximation error. For important classes of matrices, the computational cost increases only logarithmically with the approximation error. The operations provided include the matrix inversion and LU decomposition. Since large-scale linear algebra problems are standard in scientific computing, the subject of hierarchical matrices is of interest to scientists ...

  8. Hierarchical Semantic Model of Geovideo

    Directory of Open Access Journals (Sweden)

    XIE Xiao

    2015-05-01

    Full Text Available The public security incidents were getting increasingly challenging with regard to their new features, including multi-scale mobility, multistage dynamic evolution, as well as spatiotemporal concurrency and uncertainty in the complex urban environment. However, the existing video models, which were used/designed for independent archive or local analysis of surveillance video, have seriously inhibited emergency response to the urgent requirements.Aiming at the explicit representation of change mechanism in video, the paper proposed a novel hierarchical geovideo semantic model using UML. This model was characterized by the hierarchical representation of both data structure and semantics based on the change-oriented three domains (feature domain, process domain and event domain instead of overall semantic description of video streaming; combining both geographical semantics and video content semantics, in support of global semantic association between multiple geovideo data. The public security incidents by video surveillance are inspected as an example to illustrate the validity of this model.

  9. Hybrid and hierarchical composite materials

    CERN Document Server

    Kim, Chang-Soo; Sano, Tomoko

    2015-01-01

    This book addresses a broad spectrum of areas in both hybrid materials and hierarchical composites, including recent development of processing technologies, structural designs, modern computer simulation techniques, and the relationships between the processing-structure-property-performance. Each topic is introduced at length with numerous  and detailed examples and over 150 illustrations.   In addition, the authors present a method of categorizing these materials, so that representative examples of all material classes are discussed.

  10. Hierarchical analysis of urban space

    OpenAIRE

    Kataeva, Y.

    2014-01-01

    Multi-level structure of urban space, multitude of subjects of its transformation, which follow asymmetric interests, multilevel system of institutions which regulate interaction in the "population business government -public organizations" system, determine the use of hierarchic approach to the analysis of urban space. The article observes theoretical justification of using this approach to study correlations and peculiarities of interaction in urban space as in an intricately organized syst...

  11. The Comparison of Layout Arrangements for the Material Flow Ordering Planning in Production Systems through Simulation Analysis

    Directory of Open Access Journals (Sweden)

    Mehmet AKSARAYLI

    2009-02-01

    Full Text Available Enterprises have to make suitable location planning to decrease their product cost and to increase their productivity in our time. The aim of this study is to compare the basic layout types used in arranging inside facility layout with each other by using simulation. Especially in this study, material handling times between machines and ratio of these times in total times were interested. First of all a new production system is designed to the basic layout types used in arranging inside facility layout. And then in the designed production system, machines are arranged for each machine layout types. Machine layout types are transferred to PROMODEL simulation software. Then with the results of analysis, material handling times of different machine layout types and ratio of material handling times in total production time were compared and the results obtained from this analysis were given after commented on this study.

  12. A Column-Generation Approach for a Short-Term Production Planning Problem in Closed-Loop Supply Chains

    Directory of Open Access Journals (Sweden)

    Florian Sahling

    2013-05-01

    Full Text Available We present a new model formulation for a multi-product lot-sizing problem with product returns and remanufacturing subject to a capacity constraint. The given external demand of the products has to be satisfied by remanufactured or newly produced goods. The objective is to determine a feasible production plan, which minimizes production, holding, and setup costs. As the LP relaxation of a model formulation based on the well-known CLSP leads to very poor lower bounds, we propose a column-generation approach to determine tighter bounds. The lower bound obtained by column generation can be easily transferred into a feasible solution by a truncated branch-and-bound approach using CPLEX. The results of an extensive numerical study show the high solution quality of the proposed solution approach.

  13. Statistical Significance for Hierarchical Clustering

    Science.gov (United States)

    Kimes, Patrick K.; Liu, Yufeng; Hayes, D. Neil; Marron, J. S.

    2017-01-01

    Summary Cluster analysis has proved to be an invaluable tool for the exploratory and unsupervised analysis of high dimensional datasets. Among methods for clustering, hierarchical approaches have enjoyed substantial popularity in genomics and other fields for their ability to simultaneously uncover multiple layers of clustering structure. A critical and challenging question in cluster analysis is whether the identified clusters represent important underlying structure or are artifacts of natural sampling variation. Few approaches have been proposed for addressing this problem in the context of hierarchical clustering, for which the problem is further complicated by the natural tree structure of the partition, and the multiplicity of tests required to parse the layers of nested clusters. In this paper, we propose a Monte Carlo based approach for testing statistical significance in hierarchical clustering which addresses these issues. The approach is implemented as a sequential testing procedure guaranteeing control of the family-wise error rate. Theoretical justification is provided for our approach, and its power to detect true clustering structure is illustrated through several simulation studies and applications to two cancer gene expression datasets. PMID:28099990

  14. Scenario Approach to the Planning of the Production Activities of the Enterprise with a Discrete Type of Production (for Example, Electrical Engineering Industry

    Directory of Open Access Journals (Sweden)

    Krylova E.V.

    2017-12-01

    Full Text Available In conditions of global economic instability the success of electromechanical enterprises depends on their ability to react quickly to challenges of external environment. In order to create background and conditions for this ability the given enterprises refer to manufacturing activity planning, using a probabilistic approach based on forecasts that may not be true. The question of provision of more complete consideration of various internal and external factors and acceleration of decision making process and reaction to changing business environment arises before the organizations that concern more effective scheduling policy. International practice of solving such problems generally leads to qualitative discussion, whereas quantitative assessment of impact of control parameters of enterprise is not practically used, because there is no one systematic approach to manufacturing activity planning. On the basis of studying of international practices methodical guidelines of scenario approach to manufacturing activity planning with mathematical modeling of economics of producer price on electromechanical enterprises have been developed, which reasonably could be used with reference to and interaction with enterprise manufacturing program. The described approach allows solving planning problems iteratively in real-time mode concerning profit maximization, to form producer prices, to divide overhead costs according to the type of products and carry out cost accounting according to the type of a product, and it will provide functional interaction between factors and performance indicators.

  15. The US department of energy's research and development plans for the use of nuclear energy for hydrogen production

    International Nuclear Information System (INIS)

    Henderson, A.D.; Pickard, P.S.; Park, C.V.; Kotek, J.F.

    2004-01-01

    The potential of hydrogen as a transportation fuel and for stationary power applications has generated significant interest in the United States. President George W. Bush has set the transition to a 'hydrogen economy' as one of the Administration's highest priorities. A key element of an environmentally-conscious transition to hydrogen is the development of hydrogen production technologies that do not emit greenhouse gases or other air pollutants. The Administration is investing in the development of several technologies, including hydrogen production through the use of renewable fuels, fossil fuels with carbon sequestration, and nuclear energy. The US Department of Energy's Office of Nuclear Energy, Science and Technology initiated the Nuclear Hydrogen Initiative to develop hydrogen production cycles that use nuclear energy. The Nuclear Hydrogen Initiative has completed a Nuclear Hydrogen R and D Plan to identify candidate technologies, assess their viability, and define the R and D required to enable the demonstration of nuclear hydrogen production by 2016. This paper gives a brief overview of the Nuclear Hydrogen Initiative, describes the purposes of the Nuclear Hydrogen R and D Plan, explains the methodology followed to prepared the plan, presents the results, and discusses the path forward for the US programme to develop technologies which use nuclear energy to produce hydrogen. (author)

  16. Interfaz entre el plan de producción y el programa de producción en ambientes de ensamble Interface between the production plan and the master production schedule in assembly environments

    Directory of Open Access Journals (Sweden)

    Marcos Moya Navarro

    2012-11-01

    Full Text Available En un entorno de producción existe una relación directa entre el mercado y los procesos de manufactura de los bienes. Sin embargo, cuando la producción está inmersa en un ambiente de ensamble, el procedimiento de la planificación y la programación se vuelve complejo, con el riesgo de que la empresa pierda ventaja competitiva en términos de incumplimiento de las fechas de entrega y elevados costos de planificación y control. La programación lineal constituye una herramienta apropiada para construir modelos de programación y control de la producción en entornos de manufactura complejos. El objetivo de este trabajo es mostrar la interfaz entre el plan de producción y el programa de producción en ambientes de ensamble mediante el modelado por programación lineal. Para ello, se seleccionó un entorno que produce tres productos finales cuya estructura de producto está dispuesta en tres niveles con un máximo de ocho componentes. Los datos proporcionados por el plan de producción se desglosaron en diez órdenes, cada una indicando el tipo de producto, la cantidad por producir y su respectiva fecha de entrega. Los resultados obtenidos en el programa de producción establecieron la recepción de pedidos planificados y el programa de componentes totales requeridos en cada periodo de producción, para minimizar los costos totales de emisión de órdenes de producción e inventario.In a production environment there is a direct relationship between the market and the manufacturing process of goods.When production is immersed in an assembly environment, the process of production planning and scheduling becomes complex, and the enterprises have the risk of losing competitive advantages in terms of not meeting delivery dates and production high costs. Linear programming has become an appropriate tool for production planning and scheduling in complex manufacturing environments. The aim of this paper is to show the interface between both the

  17. Production-logistic system in the aspect of strategies for production planning and control and for logistic customer service

    Directory of Open Access Journals (Sweden)

    Łukasz Hadaś

    2014-09-01

    Full Text Available Background: The authors made multi-dimensional review of production and logistic strategies in order to prove their coherence in shaping internal and external supply chain. The paper is concluded with definition of production-logistic system as an object of modeling in transformation of business systems of manufacturing companies. Material and methods: The paper is based on analysis of state of the art presented in the literature on the subject of production and logistics strategies. Publications of key importance were selected to identify genesis and basic assumptions of strategies and their functioning. Comparative synthesis of logistic and production strategies identified is developed with respect to authors' experience in application of predefined tools and methods characteristic for strategies identified. Results: The result of the work conducted is consolidation of production and logistic strategies according to multi-variant customer service and original definition of production and logistic system. Conclusions: Production system and logistic system can and should be treated as equal elements in context of material flows management in internal and external supply chains. Such approach enables modeling of both systems as coherent elements realizing selected strategy of customer service.     

  18. Application of the Extended Theory of Planned Behavior Model to Investigate Purchase Intention of Green Products among Thai Consumers

    Directory of Open Access Journals (Sweden)

    Kamonthip Maichum

    2016-10-01

    Full Text Available Green products are among the widely used products worldwide due to their environmental benefits. However, information on the consumers’ purchase intention towards green products in developing countries, such as Thailand, is lacking. This study aims to investigate Thai consumers who are aged over 18 years, and whose base education is high school, on purchase intention for green products by using an extended framework of the theory of planned behavior (TPB. We derived and examined the model through structural equation modeling in a sample of 483 respondents in Thailand. The findings of this model indicated that consumer attitude, subjective norm and perceived behavioral control have significant positive influences on the purchase intention for green products. Furthermore, our results indicated that environmental concerns have a significant effect on attitude, perceived behavioral control and purchase intention for green products, but subjective norm. Moreover, environmental knowledge had no significant effect on the purchase intention for green products. Instead, it had a distinct indirect effect through attitude towards purchasing green products, subjective norm and perceived behavioral control. The findings from this study contribute to improving the understanding of intention to purchase green products, which could play a major role towards sustainable consumption.

  19. The MIL-88A-Derived Fe3O4-Carbon Hierarchical Nanocomposites for Electrochemical Sensing

    Science.gov (United States)

    Wang, Li; Zhang, Yayun; Li, Xia; Xie, Yingzhen; He, Juan; Yu, Jie; Song, Yonghai

    2015-01-01

    Metal or metal oxides/carbon nanocomposites with hierarchical superstructures have become one of the most promising functional materials in sensor, catalysis, energy conversion, etc. In this work, novel hierarchical Fe3O4/carbon superstructures have been fabricated based on metal-organic frameworks (MOFs)-derived method. Three kinds of Fe-MOFs (MIL-88A) with different morphologies were prepared beforehand as templates, and then pyrolyzed to fabricate the corresponding novel hierarchical Fe3O4/carbon superstructures. The systematic studies on the thermal decomposition process of the three kinds of MIL-88A and the effect of template morphology on the products were carried out in detail. Scanning electron microscopy, transmission electron microscopy, X-ray powder diffraction, X-ray photoelectron spectroscopy and thermal analysis were employed to investigate the hierarchical Fe3O4/carbon superstructures. Based on these resulted hierarchical Fe3O4/carbon superstructures, a novel and sensitive nonenzymatic N-acetyl cysteine sensor was developed. The porous and hierarchical superstructures and large surface area of the as-formed Fe3O4/carbon superstructures eventually contributed to the good electrocatalytic activity of the prepared sensor towards the oxidation of N-acetyl cysteine. The proposed preparation method of the hierarchical Fe3O4/carbon superstructures is simple, efficient, cheap and easy to mass production. It might open up a new way for hierarchical superstructures preparation. PMID:26387535

  20. A Framework for a Decision Support System in a Hierarchical Extended Enterprise Decision Context

    Science.gov (United States)

    Boza, Andrés; Ortiz, Angel; Vicens, Eduardo; Poler, Raul

    Decision Support System (DSS) tools provide useful information to decision makers. In an Extended Enterprise, a new goal, changes in the current objectives or small changes in the extended enterprise configuration produce a necessary adjustment in its decision system. A DSS in this context must be flexible and agile to make suitable an easy and quickly adaptation to this new context. This paper proposes to extend the Hierarchical Production Planning (HPP) structure to an Extended Enterprise decision making context. In this way, a framework for DSS in Extended Enterprise context is defined using components of HPP. Interoperability details have been reviewed to identify the impact in this framework. The proposed framework allows overcoming some interoperability barriers, identifying and organizing components for a DSS in Extended Enterprise context, and working in the definition of an architecture to be used in the design process of a flexible DSS in Extended Enterprise context which can reuse components for futures Extended Enterprise configurations.

  1. Speech production and working memory: The influence of cognitive load on sentence planning

    OpenAIRE

    Klaus, Jana

    2015-01-01

    For the last four decades, psycholinguistic research has dealt with the question to what extent elements of simple sentences like “The monk read the book” are planned ahead both on the abstract-lexical and phonological processing level. While a number of studies have shown that all up to the final element can be activated on these two levels, empirical evidence on the flexibility of the respective planning scopes is inconsistent, and a systematic delineation of the influence of different fo...

  2. The War on Illegal Drug Production and Trafficking: An Economic Evaluation of Plan Colombia

    OpenAIRE

    Daniel Mejía; Pascual Restrepo

    2008-01-01

    This paper provides a thorough economic evaluation of the anti-drug policies implemented in Colombia between 2000 and 2006 under the so-called Plan Colombia. The paper develops a game theory model of the war against illegal drugs in producer countries. We explicitly model illegal drug markets, which allows us to account for the feedback effects between policies and market outcomes that are potentially important when evaluating large scale policy interventions such as Plan Colombia. We use ava...

  3. Guideline on action plans and strategies to mobilize waste-to-energy production

    Energy Technology Data Exchange (ETDEWEB)

    Loonik, J.; Saarepera, R.; Kaeger, M. [and others

    2012-12-15

    This report presents some results of the REMOWE project and sets guidelines for regional policy makers, SME's and the general public as well for more deep realization of waste-to-energy policy principles in action. The overall objective of the project is, on regional levels, to contribute to a decreased negative effect on the environment by reduction of carbon dioxide emission by creating a balance between energy consumption and sustainable use of renewable energy sources (waste-to-energy cycle). Reduction of carbon dioxide emissions and use of renewable energy sources are broad areas and this project will focus on energy resources from waste and actions to facilitate implementation of energy efficient technology in the Baltic Sea region within the waste-to-energy area. The focus is to utilise waste from cities, farming and industry for energy purposes in an efficient way. The project seeks to facilitate the implementation of sustainable systems for waste-to-energy in the Baltic Sea region and specifically, in a first step, in the project partner regions. The project's duration is 12/2009-12/2012. This report is structured into 8 chapters, which are further divided into subchapters if needed. Relevant data about current situation about waste generation and management in partner regions of REMOWE project are described in Chapter 1. There are guidelines on action plan and strategies for regional policy makers, SME's and the general public to mobilize waste to energy production in Chapter 2. Beside guidelines, this report contains references to basic political acts of waste and energy management of EU and best practices of implementation them in regional level (Chapter 3). The focus of Chapters 4 and 5 is on energetic potential of waste and technologies for utilisation of waste for energy purposes. During the project period in each of partner region innovation processes were realised and innovation ides evaluated, basic results are collected into

  4. A Study on Promotion and Implementation of Cleaner Production Practices in Malaysian Industry - Development of a National Program and Action Plan for Promotion of Cleaner Production. Progress Report 1

    DEFF Research Database (Denmark)

    Wangel, Arne

    This Progress Report presents the initial findings of the research project 'A Study on Promotion and Implementation of Cleaner Production Practices in Malaysian Industry - Development of a National Program and Action Plan for Promotion of Cleaner Production. Progress Report' funded...

  5. A 2nd generation static model for predicting greenhouse energy inputs, as an aid for production planning

    CERN Document Server

    Jolliet, O; Munday, G L

    1985-01-01

    A model which allows accurate prediction of energy consumption of a greenhouse is a useful tool for production planning and optimisation of greenhouse components. To date two types of model have been developed; some very simple models of low precision, others, precise dynamic models unsuitable for employment over long periods and too complex for use in practice. A theoretical study and measurements at the CERN trial greenhouse have allowed development of a new static model named "HORTICERN", easy to use and as precise as more complex dynamic models. This paper demonstrates the potential of this model for long-term production planning. The model gives precise predictions of energy consumption when given greenhouse conditions of use (inside temperatures, dehumidification by ventilation, …) and takes into account local climatic conditions (wind radiative losses to the sky and solar gains), type of greenhouse (cladding, thermal screen …). The HORTICERN method has been developed for PC use and requires less...

  6. New product introduction and supplier integration in sales and operations planning : evidence from the Asia Pacific region

    OpenAIRE

    Goh, Shao Hung; Eldridge, Stephen

    2015-01-01

    Purpose: This paper investigates the implementation and performance benefits of Sales and Operations Planning (S&OP) within organizations in Asia Pacific. Design/methodology/approach: A case study method was used, with two companies selected. The first company had recently commenced S&OP and applied it to facilitate New Product Introduction, while the second had integrated its supplier into an existing S&OP program. Supply chain performance data was collected and analyzed in the context of an...

  7. Army Justified Initial Production Plan for the Paladin Integrated Management Program but Has Not Resolved Two Vehicle Performance Deficiencies (Redacted)

    Science.gov (United States)

    2016-08-05

    model oversight organization in the Federal Government by leading change, speaking truth, and promoting excellence—a diverse organization, working ...VIRGINIA 22350-1500 August 5, 2016 MEMORANDUM FOR AUDITOR GENERAL, DEPARTMENT OF THE ARMY SUBJECT: Army Justified Initial Production Plan for the Paladin... Family of Vehicles, M109A7 Self-Propelled Howitzer and M992A3 Carrier, Ammunition, Tracked, October 2015; • M109A7 AFES Overview, September 2015

  8. Planning of the evaluation of cleaner production experiences in the CEPITA companies

    DEFF Research Database (Denmark)

    Jørgensen, Michael Søgaard

    1998-01-01

    The report describes the theoretical and methodological background for the evaluation in 1998 of the cleaner production implementation in a nu,mber of Tanzanian companies taking part in a DANIDA financed cleaner production develeopment project in 1994-95......The report describes the theoretical and methodological background for the evaluation in 1998 of the cleaner production implementation in a nu,mber of Tanzanian companies taking part in a DANIDA financed cleaner production develeopment project in 1994-95...

  9. A Planning Guide for Small and Medium Size Wood Products Companies

    Science.gov (United States)

    Jeff Howe; Stephen Bratkovich

    2005-01-01

    At the beginning of the 21st century, North American wood products companies are facing competitive pressure from numerous sources. Traditional products are being manufactured in new regions (e.g., China and the developing nations), and substitute products are being developed by competing industries (e.g., plastics and composites). The bottom line is strained by...

  10. Flexible lot sizing in hybrid make-to-order/make-to-stock production planning

    NARCIS (Netherlands)

    Beemsterboer, Bart; Land, Martin; Teunter, Ruud

    2017-01-01

    Hybrid make-to-order/make-to-stock production systems are difficult to control. Batch production of make-to-stock products allows for efficient capacity usage, but fixed batch sizes can make the system less responsive to make-to-order customers. Using Markov Decision Process modeling, we show that

  11. Hierarchal scalar and vector tetrahedra

    International Nuclear Information System (INIS)

    Webb, J.P.; Forghani, B.

    1993-01-01

    A new set of scalar and vector tetrahedral finite elements are presented. The elements are hierarchal, allowing mixing of polynomial orders; scalar orders up to 3 and vector orders up to 2 are defined. The vector elements impose tangential continuity on the field but not normal continuity, making them suitable for representing the vector electric or magnetic field. Further, the scalar and vector elements are such that they can easily be used in the same mesh, a requirement of many quasi-static formulations. Results are presented for two 50 Hz problems: the Bath Cube, and TEAM Problem 7

  12. Power system generation expansion planning using the maximum principle and analytical production cost model

    International Nuclear Information System (INIS)

    Lee, K.Y.; Park, Y.M.

    1991-01-01

    Historically, the electric utility demand in most countries has increased rapidly, with a doubling of approximately 10 years in the case of developing countries. In order to meet this growth in demand, the planners of expansion policies were concerned with obtaining expansion pans which dictate what new generation facilities to add and when to add them. This paper reports that, however, the practical planning problem is extremely difficult and complex, and required many hours of the planner's time even though the alternatives examined were extremely limited. In this connection, increased motivation for more sophisticated techniques of valuating utility expansion policies has been developed during the past decade. Among them, the long-range generation expansion planning is to select the most economical and reliable generation expansion plans in order to meet future power demand over a long period of time subject to a multitude of technical, economical, and social constraints

  13. PLAN FOR PRIMARY HEALTH CARE IN MINAS GERAIS AND SCIENTIFIC PRODUCTION

    Directory of Open Access Journals (Sweden)

    Tatiana Oliveira Silva Bittencourt

    2014-05-01

    Full Text Available This study aimed to identify studies on the Master Plan for Primary Health Care from the year 2003. We conducted a bibliographic study on MEDLINE, LILACS, SCIELO , BDENF and Google Scholar . The results are detailed in tables and discussed from four themes. The Master Plan for Primary Health Care is an innovative and daring in the reorganization of primary care in the municipalities miners. Gave the participants an important opportunity for professional qualification. Difficulties in its implementation outperformed the potential and were present in most of the municipalities surveyed. Among the main challenges for its implementation highlights the lack of professional motivation and credibility by some involved in this process. The literature made little progress on this issue , and we hope that further research be undertaken in order to contribute to studies of evaluation of public policies and in particular the extension and consolidation of this plan.

  14. Developing a New North American Land Cover Product at 30m Resolution: Methods, Results and Future Plans

    Science.gov (United States)

    Homer, C.; Colditz, R. R.; Latifovic, R.; Llamas, R. M.; Pouliot, D.; Danielson, P.; Meneses, C.; Victoria, A.; Ressl, R.; Richardson, K.; Vulpescu, M.

    2017-12-01

    Land cover and land cover change information at regional and continental scales has become fundamental for studying and understanding the terrestrial environment. With recent advances in computer science and freely available image archives, continental land cover mapping has been advancing to higher spatial resolution products. The North American Land Change Monitoring System (NALCMS) remains the principal provider of seamless land cover maps of North America. Founded in 2006, this collaboration among the governments of Canada, Mexico and the United States has released two previous products based on 250m MODIS images, including a 2005 land cover and a 2005-2010 land cover change product. NALCMS has recently completed the next generation North America land cover product, based upon 30m Landsat images. This product now provides the first ever 30m land cover produced for the North American continent, providing 19 classes of seamless land cover. This presentation provides an overview of country-specific image classification processes, describes the continental map production process, provides results for the North American continent and discusses future plans. NALCMS is coordinated by the Commission for Environmental Cooperation (CEC) and all products can be obtained at their website - www.cec.org.

  15. Business plan Production of potato crisps and chips Zambezi Valley, Mozambique

    NARCIS (Netherlands)

    Haverkort, A.J.; Saavedra Gonzalez, Y.R.

    2015-01-01

    This business plan has been prepared for local entrepreneurs who would like to expand/start their business portfolio and are looking for an opportunity of investment in the agricultural sector in the Zambezi Valley in Mozambique. We propose the creation of two small-scale processing industries (can

  16. Speech production in people who stutter: Testing the motor plan assembly hypothesis

    NARCIS (Netherlands)

    Lieshout, P.H.H.M. van; Hulstijn, W.; Peters, H.F.M.

    1996-01-01

    The main purpose of the present study was to test the hypothesis that persons who stutter, when compared to persons who do not stutter, are less able to assemble abstract motor plans for short verbal responses. Subjects were adult males who stutter and age- and sex-matched control speakers, who were

  17. Loops in hierarchical channel networks

    Science.gov (United States)

    Katifori, Eleni; Magnasco, Marcelo

    2012-02-01

    Nature provides us with many examples of planar distribution and structural networks having dense sets of closed loops. An archetype of this form of network organization is the vasculature of dicotyledonous leaves, which showcases a hierarchically-nested architecture. Although a number of methods have been proposed to measure aspects of the structure of such networks, a robust metric to quantify their hierarchical organization is still lacking. We present an algorithmic framework that allows mapping loopy networks to binary trees, preserving in the connectivity of the trees the architecture of the original graph. We apply this framework to investigate computer generated and natural graphs extracted from digitized images of dicotyledonous leaves and animal vasculature. We calculate various metrics on the corresponding trees and discuss the relationship of these quantities to the architectural organization of the original graphs. This algorithmic framework decouples the geometric information from the metric topology (connectivity and edge weight) and it ultimately allows us to perform a quantitative statistical comparison between predictions of theoretical models and naturally occurring loopy graphs.

  18. Hierarchically nested river landform sequences

    Science.gov (United States)

    Pasternack, G. B.; Weber, M. D.; Brown, R. A.; Baig, D.

    2017-12-01

    River corridors exhibit landforms nested within landforms repeatedly down spatial scales. In this study we developed, tested, and implemented a new way to create river classifications by mapping domains of fluvial processes with respect to the hierarchical organization of topographic complexity that drives fluvial dynamism. We tested this approach on flow convergence routing, a morphodynamic mechanism with different states depending on the structure of nondimensional topographic variability. Five nondimensional landform types with unique functionality (nozzle, wide bar, normal channel, constricted pool, and oversized) represent this process at any flow. When this typology is nested at base flow, bankfull, and floodprone scales it creates a system with up to 125 functional types. This shows how a single mechanism produces complex dynamism via nesting. Given the classification, we answered nine specific scientific questions to investigate the abundance, sequencing, and hierarchical nesting of these new landform types using a 35-km gravel/cobble river segment of the Yuba River in California. The nested structure of flow convergence routing landforms found in this study revealed that bankfull landforms are nested within specific floodprone valley landform types, and these types control bankfull morphodynamics during moderate to large floods. As a result, this study calls into question the prevailing theory that the bankfull channel of a gravel/cobble river is controlled by in-channel, bankfull, and/or small flood flows. Such flows are too small to initiate widespread sediment transport in a gravel/cobble river with topographic complexity.

  19. Stability of glassy hierarchical networks

    Science.gov (United States)

    Zamani, M.; Camargo-Forero, L.; Vicsek, T.

    2018-02-01

    The structure of interactions in most animal and human societies can be best represented by complex hierarchical networks. In order to maintain close-to-optimal function both stability and adaptability are necessary. Here we investigate the stability of hierarchical networks that emerge from the simulations of an organization type with an efficiency function reminiscent of the Hamiltonian of spin glasses. Using this quantitative approach we find a number of expected (from everyday observations) and highly non-trivial results for the obtained locally optimal networks, including, for example: (i) stability increases with growing efficiency and level of hierarchy; (ii) the same perturbation results in a larger change for more efficient states; (iii) networks with a lower level of hierarchy become more efficient after perturbation; (iv) due to the huge number of possible optimal states only a small fraction of them exhibit resilience and, finally, (v) ‘attacks’ targeting the nodes selectively (regarding their position in the hierarchy) can result in paradoxical outcomes.

  20. Hierarchical modeling of active materials

    International Nuclear Information System (INIS)

    Taya, Minoru

    2003-01-01

    Intelligent (or smart) materials are increasingly becoming key materials for use in actuators and sensors. If an intelligent material is used as a sensor, it can be embedded in a variety of structure functioning as a health monitoring system to make their life longer with high reliability. If an intelligent material is used as an active material in an actuator, it plays a key role of making dynamic movement of the actuator under a set of stimuli. This talk intends to cover two different active materials in actuators, (1) piezoelectric laminate with FGM microstructure, (2) ferromagnetic shape memory alloy (FSMA). The advantage of using the FGM piezo laminate is to enhance its fatigue life while maintaining large bending displacement, while that of use in FSMA is its fast actuation while providing a large force and stroke capability. Use of hierarchical modeling of the above active materials is a key design step in optimizing its microstructure for enhancement of their performance. I will discuss briefly hierarchical modeling of the above two active materials. For FGM piezo laminate, we will use both micromechanical model and laminate theory, while for FSMA, the modeling interfacing nano-structure, microstructure and macro-behavior is discussed. (author)

  1. Hierarchical organisation of causal graphs

    International Nuclear Information System (INIS)

    Dziopa, P.

    1993-01-01

    This paper deals with the design of a supervision system using a hierarchy of models formed by graphs, in which the variables are the nodes and the causal relations between the variables of the arcs. To obtain a representation of the variables evolutions which contains only the relevant features of their real evolutions, the causal relations are completed with qualitative transfer functions (QTFs) which produce roughly the behaviour of the classical transfer functions. Major improvements have been made in the building of the hierarchical organization. First, the basic variables of the uppermost level and the causal relations between them are chosen. The next graph is built by adding intermediary variables to the upper graph. When the undermost graph has been built, the transfer functions parameters corresponding to its causal relations are identified. The second task consists in the upwelling of the information from the undermost graph to the uppermost one. A fusion procedure of the causal relations has been designed to compute the QFTs relevant for each level. This procedure aims to reduce the number of parameters needed to represent an evolution at a high level of abstraction. These techniques have been applied to the hierarchical modelling of nuclear process. (authors). 8 refs., 12 figs

  2. Application of Fuzzy Optimization to Production-Distribution Planning in Supply Chain Management

    Directory of Open Access Journals (Sweden)

    S. Ariafar

    2014-01-01

    Full Text Available A production-distribution model has been developed that not only allocates the limited available resources and equipment to produce the products over the time periods, but also determines the economical distributors for dispatching the products to the distribution centers or retailers. The model minimizes production, inventory holding, backordering, and transportation cost while considering the time value of money. Since uncertainty is an inevitable issue of any real-world production system, then to provide a realistic model, the concept of fuzzy sets has been applied in the proposed mathematical modeling. To illustrate and show the feasibility and validity of the model, a real case analysis, which is pertaining to a mineral water bottling production factory, has been used. The case has been solved using a three-step solution approach developed in this study. The results show the feasibility and validity of the mathematical model, and also the solution procedure.

  3. Studies on production planning of IPEN fuel-element plant in order to meet RMB demand

    Energy Technology Data Exchange (ETDEWEB)

    Negro, Miguel L.M.; Saliba-Silva, Adonis M.; Durazzo, Michelangelo, E-mail: mlnegro@ipen.br, E-mail: saliba@ipen.br, E-mail: mdurazzo@ipen.br [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN-SP), Sao Paulo, SP (Brazil)

    2015-07-01

    The plant of the Nuclear Fuel Center (CCN) will have to change its current laboratorial production level to an industrial level in order to meet the fuel demand of RMB and of IEA-R1. CCN's production process is based on the hydrolysis of UF6, which is not a frequent production route for nuclear fuel. The optimization of the production capacity of such a production route is a new field of studies. Two different approaches from the area of Operations Research (OR) were used in this paper. The first one was the PERT/CPM technique and the second one was the creation of a mathematical linear model for minimization of the production time. PERT/CPM's results reflect the current situation and disclose which production activities may not be critical. The results of the second approach show a new average time of 3.57 days to produce one Fuel Element and set the need of inventory. The mathematical model is dynamic, so that it issues better results if performed monthly. CCN's management team will therefore have a clearer view of the process times and production and inventory levels. That may help to shape the decisions that need to be taken for the enlargement of the plant's production capacity. (author)

  4. 76 FR 48941 - Notification of Petition for Approval; Product Safety Plan

    Science.gov (United States)

    2011-08-09

    ... workers, and other railway equipment, while also increasing railroad productivity. Marquette asserts the... behalf of an association, business, labor union, etc.). You may review DOT's complete Privacy Act...

  5. Studies on production planning of IPEN fuel-element plant in order to meet RMB demand

    International Nuclear Information System (INIS)

    Negro, Miguel L.M.; Saliba-Silva, Adonis M.; Durazzo, Michelangelo

    2015-01-01

    The plant of the Nuclear Fuel Center (CCN) will have to change its current laboratorial production level to an industrial level in order to meet the fuel demand of RMB and of IEA-R1. CCN's production process is based on the hydrolysis of UF6, which is not a frequent production route for nuclear fuel. The optimization of the production capacity of such a production route is a new field of studies. Two different approaches from the area of Operations Research (OR) were used in this paper. The first one was the PERT/CPM technique and the second one was the creation of a mathematical linear model for minimization of the production time. PERT/CPM's results reflect the current situation and disclose which production activities may not be critical. The results of the second approach show a new average time of 3.57 days to produce one Fuel Element and set the need of inventory. The mathematical model is dynamic, so that it issues better results if performed monthly. CCN's management team will therefore have a clearer view of the process times and production and inventory levels. That may help to shape the decisions that need to be taken for the enlargement of the plant's production capacity. (author)

  6. Product design planning with the analytic hierarchy process in inter-organizational networks

    NARCIS (Netherlands)

    Hummel, J. Marjan; van Rossum, Wouter; Verkerke, Gijsbertus Jacob; Rakhorst, Gerhard

    2002-01-01

    In the second half of inter–organizational product development, the new product is likely to face significant design changes. Our study focused on the adequacy of the analytic hierarchy process (AHP) to support the collaborative partners to steer and align the accompanying design activities. It

  7. Product design planning with the analytic hierarchy process in inter-organizational networks

    NARCIS (Netherlands)

    Hummel, J.M.; van Rossum, Wouter; Verkerke, Bart; Rakhorst, G

    2002-01-01

    In the second half of inter-organizational product developments the new product is likely to face significant design changes. Our study focused on the adequacy of the analytic hierarchy process (AHP) to support the collaborative partners to steer and align the accompanying design activities. It

  8. Salience Effects: L2 Sentence Production as a Window on L1 Speech Planning

    Science.gov (United States)

    Antón-Méndez, Inés; Gerfen, Chip; Ramos, Miguel

    2016-01-01

    Salience influences grammatical structure during production in a language-dependent manner because different languages afford different options to satisfy preferences. During production, speakers may always try to satisfy all syntactic encoding preferences (e.g., salient entities to be mentioned early, themes to be assigned the syntactic function…

  9. Simulation-based production planning for engineer-to-order systems with random yield

    NARCIS (Netherlands)

    Akcay, Alp; Martagan, Tugce

    2018-01-01

    We consider an engineer-to-order production system with unknown yield. We model the yield as a random variable which represents the percentage output obtained from one unit of production quantity. We develop a beta-regression model in which the mean value of the yield depends on the unique

  10. 77 FR 35110 - Agency Information Collection Activity Under OMB Review: Production Plan Reports

    Science.gov (United States)

    2012-06-12

    ... methods: Federal eRulemaking Portal: http://www.regulations.gov . Follow the online instructions for... products, in order to examine how manufacturers anticipate tying technology introduction to product design... for light-duty fuel economy standards. These standards may be issued for a one to five year time frame...

  11. 78 FR 26258 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; Consumer Products and...

    Science.gov (United States)

    2013-05-06

    ... adopt these VOC limits to create more consistency in regional and national markets for consumer products... organic compound (VOC) content limits and associated provisions for additional consumer products categories into the state's SIP. Finally, EPA is approving language to clarify VOC limit applicability for...

  12. Modelling ramp-up curves to reflect learning: improving capacity planning in secondary pharmaceutical production

    DEFF Research Database (Denmark)

    Hansen, Klaus Reinholdt Nyhuus; Grunow, Martin

    2015-01-01

    availability at market launch is ensured. Our MILP model is applied to a real industry case study using three empirically observed ramp-up curves to demonstrate its value as decision support tool. We demonstrate the superiority of our volume-dependent method over the traditional time-dependent ramp......The experience gained during production ramp-up leads to an increase of the effective production capacity over time. However, full utilisation of production capacity is not always possible during ramp-up. In such cases, the experience gained and hence the available effective capacity...... are overestimated. We develop a new method, which captures ramp-up as a function of the cumulative production volume to better reflect the experience gained while producing the new product. The use of the more accurate and computationally effective approach is demonstrated for the case of secondary pharmaceutical...

  13. A draft plan for the routine production of PZC based 99mTc generator in the Vietnam

    International Nuclear Information System (INIS)

    Duong Van Dong

    2007-01-01

    This is an outline of the radioisotope production programme using a research reactor of 500 kW in Vietnam. Under the framework of Forum for Nuclear Cooperation in Asia (FNCA) cooperation program, the PZC based technology for production of 99m Tc-generator has been studied at Dalat Nuclear Research Institute (DNRI) as well as FNCA members countries in the past several years. The FNCA project has shown the feasibility of using a PZC column-reactor 99 Mo- 99m Tc-generator for commercial applications, citing mainly the cheaper cost of the PZC generator than the imported alumina column-fission 99 Mo generator and excellent technology achievement has been established and optimized by close cooperation between FNCA country members and KAKEN, JAERI. DNRI proposes in this draft business plan, the commercial production of PZC generator through the establishment of national project stage 2006-2008 for the routine production of 99 Mo- 99m Tc generator. In this national project the 99m Tc-generator will use PZC coming from KAKEN - Japan or locally synthesis as the column material, 99 Mo sourced from neighboring countries or irradiated at or reactor and the semi-automatic loading and adsorption machine will be studied, designed and installed in the hot cells available. Because the DNRI have facility 99m Tc-generator production line with two hot cells used production of the 99m Tc generator by using fission 99 Mo. The generator assembly will be designed and fabricated. (author)

  14. Project Rio Blanco definition plan. Additional formation evaluation and production testing

    International Nuclear Information System (INIS)

    1975-09-01

    Since the multiple Rio Blanco detonation three reentry wells have been drilled for test purposes: RB-E-01 (Emplacement Well); RB-AR-2 (Alternate Reentry Well); and RB-U-4 (Formation Evaluation Well). Additional testing in all these wells is now required to resolve some remaining technical questions. A plan describing the procedures, methods, responsibilities, and scheduling of the field operations is presented

  15. Production Planning of a Failure-Prone Manufacturing System under Different Setup Scenarios

    Directory of Open Access Journals (Sweden)

    Guy-Richard Kibouka

    2016-01-01

    Full Text Available This paper presents a control problem for the optimization of the production and setup activities of an industrial system operating in an uncertain environment. This system is subject to random disturbances (breakdowns and repairs. These disturbances can engender stock shortages. The considered industrial system represents a well-known production context in industry and consists of a machine producing two types of products. In order to switch production from one product type to another, a time factor and a reconfiguration cost for the machine are associated with the setup activities. The parts production rates and the setup strategies are the decision variables which influence the inventory and the capacity of the system. The objective of the study is to find the production and setup policies which minimize the setup and inventory costs, as well as those associated with shortages. A modeling approach based on stochastic optimal control theory and a numerical algorithm used to solve the obtained optimality conditions are presented. The contribution of the paper, for industrial systems not studied in the literature, is illustrated through a numerical example and a comparative study.

  16. A draft business plan for the production of PZC 99Mo-99mTc generator in the Philippines

    International Nuclear Information System (INIS)

    Sombrito, Elvira Z.; Cabalfin, Estelita G.; Calix, Virginia S.; Dela Rosa, Alumanda M.; Borras, Ma. Teresa L.; Bulos, Adelina dM.

    2007-01-01

    Technetium-99m ( 99m Tc) remains as the main workhorse of nuclear medicine in the country. Alone or conjugated with other ligands, it is being used to show the function of major organs and other tissues such as the lung, brain, kidney, liver and bone. It is imported to the country as 99 Mo- 99m Tc generator. These commercial generators use fission molybdenum adsorbed onto alumina column. The FNCA project has shown the feasibility of using a PZC column-reactor 99 Mo generator for commercial applications, citing mainly the cheaper cost of the PZC generator than the imported alumina column-fission 99 Mo generator. PNRI proposes in this draft business plan, the commercial production of PZC generator through the establishment of a facility for the in-house production of 99 Mo- 99m Tc generator. The generator will use PZC coming from Japan as the column material, 99 Mo sourced from neighboring countries and an automatic loading and adsorption machine. Because the PNRI has no local production of the generator, the requirements for successfully venturing into this business activity may differ from the other FNCA members. A careful assessment based on verified data will be needed to refine the business plan. (author)

  17. Primary phonological planning units in spoken word production are language-specific: Evidence from an ERP study.

    Science.gov (United States)

    Wang, Jie; Wong, Andus Wing-Kuen; Wang, Suiping; Chen, Hsuan-Chih

    2017-07-19

    It is widely acknowledged in Germanic languages that segments are the primary planning units at the phonological encoding stage of spoken word production. Mixed results, however, have been found in Chinese, and it is still unclear what roles syllables and segments play in planning Chinese spoken word production. In the current study, participants were asked to first prepare and later produce disyllabic Mandarin words upon picture prompts and a response cue while electroencephalogram (EEG) signals were recorded. Each two consecutive pictures implicitly formed a pair of prime and target, whose names shared the same word-initial atonal syllable or the same word-initial segments, or were unrelated in the control conditions. Only syllable repetition induced significant effects on event-related brain potentials (ERPs) after target onset: a widely distributed positivity in the 200- to 400-ms interval and an anterior positivity in the 400- to 600-ms interval. We interpret these to reflect syllable-size representations at the phonological encoding and phonetic encoding stages. Our results provide the first electrophysiological evidence for the distinct role of syllables in producing Mandarin spoken words, supporting a language specificity hypothesis about the primary phonological units in spoken word production.

  18. A Marketing Plan for Scientists: Building Effective Products and Connecting with Stakeholders in Meaningful Ways

    Science.gov (United States)

    A disconnect often occurs between the creation of scientific research outputs and their use by intended stakeholders. Even with the diligent efforts of scientists to create products of value, many scientific outputs are underutilized by intended stakeholders. Marketing methods ca...

  19. Multicollinearity in hierarchical linear models.

    Science.gov (United States)

    Yu, Han; Jiang, Shanhe; Land, Kenneth C

    2015-09-01

    This study investigates an ill-posed problem (multicollinearity) in Hierarchical Linear Models from both the data and the model perspectives. We propose an intuitive, effective approach to diagnosing the presence of multicollinearity and its remedies in this class of models. A simulation study demonstrates the impacts of multicollinearity on coefficient estimates, associated standard errors, and variance components at various levels of multicollinearity for finite sample sizes typical in social science studies. We further investigate the role multicollinearity plays at each level for estimation of coefficient parameters in terms of shrinkage. Based on these analyses, we recommend a top-down method for assessing multicollinearity in HLMs that first examines the contextual predictors (Level-2 in a two-level model) and then the individual predictors (Level-1) and uses the results for data collection, research problem redefinition, model re-specification, variable selection and estimation of a final model. Copyright © 2015 Elsevier Inc. All rights reserved.

  20. Distributed hierarchical radiation monitoring system

    International Nuclear Information System (INIS)

    Barak, D.

    1985-01-01

    A solution to the problem of monitoring the radiation levels in and around a nuclear facility is presented in this paper. This is a private case of a large scale general purpose data acqisition system with high reliability, availability and short maintenance time. The physical layout of the detectors in the plant, and the strict control demands dictated a distributed and hierarchical system. The system is comprised of three levels, each level contains modules. Level one contains the Control modules which collects data from groups of detectors and executes emergency local control tasks. In level two are the Group controllers which concentrate data from the Control modules, and enable local display and communication. The system computer is in level three, enabling the plant operator to receive information from the detectors and execute control tasks. The described system was built and is operating successfully for about two years. (author)