WorldWideScience

Sample records for health examination scheduling

  1. Associations Among Work and Family Health Climate, Health Behaviors, Work Schedule, and Body Weight.

    Science.gov (United States)

    Buden, Jennifer C; Dugan, Alicia G; Faghri, Pouran D; Huedo-Medina, Tania B; Namazi, Sara; Cherniack, Martin G

    2017-06-01

    Correctional employees exhibit elevated obesity rates. This study examines interrelations among health behaviors, health climate, body mass index (BMI), and work schedule. Using survey results from correctional supervisors (n = 157), mediation and moderated-mediation analyses were performed to examine how health behaviors explain relationships between obesity, work health climate (WHC) and family health climate (FHC), and work schedule. Over 85% of the sample was overweight/obese (mean BMI = 30.20). Higher WHC and FHC were associated with lower BMI, mediated by nutrition, and physical activity. The interaction effect between health behavior and work schedule revealed a protective effect on BMI. Overtime shift work may share a relationship with BMI. Findings may have implications for reexamining organizational policies on maximum weekly overtime in corrections. They provide direction for targeted obesity interventions that encourage a supportive FHC and promote healthy behaviors among supervisors working overtime.

  2. Associations among Work and Family Health Climate, Health Behaviors, Work Schedule and Body Weight

    Science.gov (United States)

    Buden, Jennifer C.; Dugan, Alicia G.; Faghri, Pouran D.; Huedo-Medina, Tania B.; Namazi, Sara; Cherniack, Martin G.

    2017-01-01

    Objectives Correctional employees exhibit elevated obesity rates. This study examines interrelations among health behaviors, health climate, BMI, and work schedule. Methods Using survey results from correctional supervisors (n=157), mediation and moderated-mediation analyses were performed to examine how health behaviors explain relationships between obesity, work health climate (WHC) and family health climate (FHC), and work schedule. Results Over 85% of the sample was overweight/obese (mean BMI=30.20). Higher WHC and FHC were associated with lower BMI, mediated by nutrition and physical activity. The interaction effect between health behavior and work schedule revealed a protective effect on BMI. Overtime shiftwork may share a relationship with BMI. Conclusions Findings may have implications for reexamining organizational policies on maximum weekly overtime in corrections. They provide direction for targeted obesity interventions that encourage a supportive FHC and promote healthy behaviors among supervisors working overtime. PMID:28471768

  3. Predicting Scheduling and Attending for an Oral Cancer Examination

    Science.gov (United States)

    Shepperd, James A.; Emanuel, Amber S.; Howell, Jennifer L.; Logan, Henrietta L.

    2015-01-01

    Background Oral and pharyngeal cancer is highly treatable if diagnosed early, yet late diagnosis is commonplace apparently because of delays in undergoing an oral cancer examination. Purpose We explored predictors of scheduling and attending an oral cancer examination among a sample of Black and White men who were at high risk for oral cancer because they smoked. Methods During an in-person interview, participants (N = 315) from rural Florida learned about oral and pharyngeal cancer, completed survey measures, and were offered a free examination in the next week. Later, participants received a follow-up phone call to explore why they did or did not attend their examination. Results Consistent with the notion that scheduling and attending an oral cancer exam represent distinct decisions, we found that the two outcomes had different predictors. Defensive avoidance and exam efficacy predicted scheduling an examination; exam efficacy and having coping resources, time, and transportation predicted attending the examination. Open-ended responses revealed that the dominant reasons participants offered for missing a scheduled examination was conflicting obligations, forgetting, and confusion or misunderstanding about the examination. Conclusions The results suggest interventions to increase scheduling and attending an oral cancer examination. PMID:26152644

  4. How Home Health Nurses Plan Their Work Schedules: A Qualitative Descriptive Study.

    Science.gov (United States)

    Irani, Elliane; Hirschman, Karen B; Cacchione, Pamela Z; Bowles, Kathryn H

    2018-06-12

    To describe how home health nurses plan their daily work schedules and what challenges they face during the planning process. Home health nurses are viewed as independent providers and value the nature of their work because of the flexibility and autonomy they hold in developing their work schedules. However, there is limited empirical evidence about how home health nurses plan their work schedules, including the factors they consider during the process and the challenges they face within the dynamic home health setting. Qualitative descriptive design. Semi-structured interviews were conducted with 20 registered nurses who had greater than 2 years of experience in home health and were employed by one of the three participating home health agencies in the mid-Atlantic region of the United States. Data were analyzed using conventional content analysis. Four themes emerged about planning work schedules and daily itineraries: identifying patient needs to prioritize visits accordingly, partnering with patients to accommodate their preferences, coordinating visit timing with other providers to avoid overwhelming patients, and working within agency standards to meet productivity requirements. Scheduling challenges included readjusting the schedule based on patient needs and staffing availability, anticipating longer visits, and maintaining continuity of care with patients. Home health nurses make autonomous decisions regarding their work schedules while considering specific patient and agency factors, and overcome challenges related to the unpredictable nature of providing care in a home health setting. Future research is needed to further explore nurse productivity in home health and improve home health work environments. Home health nurses plan their work schedules to provide high quality care that is patient-centered and timely. The findings also highlight organizational priorities to facilitate continuity of care and support nurses while alleviating the burnout

  5. Home Health Care for California's Injured Workers: Options for Implementing a Fee Schedule.

    Science.gov (United States)

    Wynn, Barbara O; Boustead, Anne

    2015-07-15

    The California Department of Industrial Relations/Division of Worker's Compensation asked RAND to provide technical assistance in developing a fee schedule for home health services provided to injured workers. The fee schedule needs to address the full spectrum of home health services ranging from skilled nursing and therapy services to unskilled personal care or chore services that may be provided by family members. RAND researchers consulted with stakeholders in the California workers' compensation system to outline issues the fee schedule should address, reviewed home health fee schedules used by other payers, and conducted interviews with WC administrators from other jurisdictions to elicit their experiences. California stakeholders identified unskilled attendant services as most problematic in determining need and payment rates, particularly services furnished by family members. RAND researchers concentrated on fee schedule options that would result in a single fee schedule covering the full range of home health care services furnished to injured workers and made three sets of recommendations. The first set pertains to obtaining additional information that would highlight the policy issues likely to occur with the implementation of the fee schedule and alternatives for assessing an injured worker's home health care needs. Another approach conforms most closely with the Labor Code requirements. It would integrate the fee schedules used by Medicare, In-Home Health Supportive Services, and the federal Office of Workers' Compensation. The third approach would base the home health fee schedule on rules used by the federal Office of Workers' Compensation.

  6. Filling the Holes: Work Schedulers as Job Crafters of Employment Practice in Long-Term Health Care

    Science.gov (United States)

    Kossek, Ellen Ernst; Piszczek, Matthew M.; Mcalpine, Kristie L.; Hammer, Leslie B.; Burke, Lisa

    2016-01-01

    Although work schedulers serve an organizational role influencing decisions about balancing conflicting stakeholder interests over schedules and staffing, scheduling has primarily been described as an objective activity or individual job characteristic. The authors use the lens of job crafting to examine how schedulers in 26 health care facilities enact their roles as they “fill holes” to schedule workers. Qualitative analysis of interview data suggests that schedulers expand their formal scope and influence to meet their interpretations of how to manage stakeholders (employers, workers, and patients). The authors analyze variations in the extent of job crafting (cognitive, physical, relational) to broaden role repertoires. They find evidence that some schedulers engage in rule-bound interpretation to avoid role expansion. They also identify four types of schedulers: enforcers, patient-focused schedulers, employee-focused schedulers, and balancers. The article adds to the job-crafting literature by showing that job crafting is conducted not only to create meaningful work but also to manage conflicting demands and to mediate among the competing labor interests of workers, clients, and employers. PMID:27721517

  7. Associations between shift schedule characteristics with sleep, need for recovery, health and performance measures for regular (semi-) continuous 3-shift systems

    NARCIS (Netherlands)

    van de Ven, Hardy A.; Brouwer, Sandra; Koolhaas, Wendy; Goudswaard, Anneke; de Looze, Michiel P.; Kecklund, Goran; Almansa, Josue; Bultmann, Ute; van der Klink, Jac J. L.

    In this cross-sectional study associations were examined between eight shift schedule characteristics with shift-specific sleep complaints and need for recovery and generic health and performance measures. It was hypothesized that shift schedule characteristics meeting ergonomic recommendations are

  8. Associations between shift schedule characteristics with sleep, need for recovery, health and performance measures for regular (semi-)continuous 3-shift systems

    NARCIS (Netherlands)

    van de Ven, Hardy A.; Brouwer, Sandra; Koolhaas, Wendy; Goudswaard, Anneke; de Looze, Michiel P.; Kecklund, Göran; Almansa, Josue; Bültmann, Ute; van der Klink, Jac J L

    2016-01-01

    In this cross-sectional study associations were examined between eight shift schedule characteristics with shift-specific sleep complaints and need for recovery and generic health and performance measures. It was hypothesized that shift schedule characteristics meeting ergonomic recommendations are

  9. Double- and Triple-Duty Caregiving Men: An Examination of Subjective Stress and Perceived Schedule Control.

    Science.gov (United States)

    DePasquale, Nicole; Zarit, Steven H; Mogle, Jacqueline; Moen, Phyllis; Hammer, Leslie B; Almeida, David M

    2018-04-01

    Based on the stress process model of family caregiving, this study examined subjective stress appraisals and perceived schedule control among men employed in the long-term care industry (workplace-only caregivers) who concurrently occupied unpaid family caregiving roles for children (double-duty child caregivers), older adults (double-duty elder caregivers), and both children and older adults (triple-duty caregivers). Survey responses from 123 men working in nursing home facilities in the United States were analyzed using multiple linear regression models. Results indicated that workplace-only and double- and triple-duty caregivers' appraised primary stress similarly. However, several differences emerged with respect to secondary role strains, specifically work-family conflict, emotional exhaustion, and turnover intentions. Schedule control also constituted a stress buffer for double- and triple-duty caregivers, particularly among double-duty elder caregivers. These findings contribute to the scarce literature on double- and triple-duty caregiving men and have practical implications for recruitment and retention strategies in the health care industry.

  10. Maternal Nonstandard Work Schedules and Child Cognitive Outcomes

    Science.gov (United States)

    Han, Wen-Jui

    2005-01-01

    This paper examined associations between mothers' work schedules and children's cognitive outcomes in the first 3 years of life for approximately 900 children from the National Institute of Child Health and Human Development Study of Early Child Care. Both the timing and duration of maternal nonstandard work schedules were examined. Although…

  11. Associations between shift schedule characteristics with sleep, need for recovery, health and performance measures for regular (semi-)continuous 3-shift systems.

    Science.gov (United States)

    van de Ven, Hardy A; Brouwer, Sandra; Koolhaas, Wendy; Goudswaard, Anneke; de Looze, Michiel P; Kecklund, Göran; Almansa, Josue; Bültmann, Ute; van der Klink, Jac J L

    2016-09-01

    In this cross-sectional study associations were examined between eight shift schedule characteristics with shift-specific sleep complaints and need for recovery and generic health and performance measures. It was hypothesized that shift schedule characteristics meeting ergonomic recommendations are associated with better sleep, need for recovery, health and performance. Questionnaire data were collected from 491 shift workers of 18 companies with 9 regular (semi)-continuous shift schedules. The shift schedule characteristics were analyzed separately and combined using multilevel linear regression models. The hypothesis was largely not confirmed. Relatively few associations were found, of which the majority was in the direction as expected. In particular early starts of morning shifts and many consecutive shifts seem to be avoided. The healthy worker effect, limited variation between included schedules and the cross-sectional design might explain the paucity of significant results. Copyright © 2016 Elsevier Ltd. All rights reserved.

  12. Further Examination of the Reliability of the Modified Rathus Assertiveness Schedule.

    Science.gov (United States)

    Del Greco, Linda; And Others

    1986-01-01

    Examined the reliability of the 30-item Modified Rathus Assertiveness Schedule (MRAS) using the test-retest method over a three-week period. The MRAS yielded correlations of .74 using the Pearson product and Spearman Brown correlation coefficient. Correlations for males yielded .77 and .72. For females correlations for both tests were .72.…

  13. Is health, measured by work ability index, affected by 12-hour rotating shift schedules?

    Science.gov (United States)

    Yong, Mei; Nasterlack, Michael; Pluto, Rolf-Peter; Elmerich, Kathrin; Karl, Dorothee; Knauth, Peter

    2010-07-01

    Two forms of continuously forward rotating 12-h shift schedules exist at BASF's Ludwigshafen site. These shift schedules were compared with a daytime working system to investigate potential differential effects on employee's health status assessed with the Work Ability Index (WAI). In the 3 x 12 system, a 12-h day shift is followed 24 h later by a 12-h night shift, and after a day off the employee returns to the day shift. The 4 x 12 schedule follows the same pattern except that there are 2 days off between the night and next day shift. A total of 924 participants (278 3 x 12 and 321 4 x 12 shiftworkers and 325 day workers) were recruited. A self-administered questionnaire was used to obtain information about shiftwork schedule, demographic characteristics, and lifestyle and social factors, and the WAI was applied. The outcomes of interest were the WAI sum score and its seven dimensions. In examining the relationship with the WAI categories, a Proportional Odds Model (POM) was used to identify the potential determinants. Logistic regression models were used to estimate the impact of age on single dimensions of WAI after adjustment for potential confounding factors. Increasing age and obesity (BMI > or = 30) were the only significant determinants of poorer WAI. Although a positive association was found linking the second WAI dimension (work ability in relation to job demands) with age, an inverse association was demonstrated consistently between age and the third and fourth WAI dimensions, i.e., number of diagnosed diseases and estimated work impairment due to disease, after adjustment for potential confounders. The age-dependency was moderate overall, but seemed to be stronger among shift- than day workers, although this difference did not reach statistical significance. There was no significant differential impact of the working time systems on the WAI sum score or on the individual WAI dimensions. Thus, there is no indication of an excessive adverse health impact

  14. A case study: the initiative to improve RN scheduling at Hamilton Health Sciences.

    Science.gov (United States)

    Wallace, Laurel-Anne; Pierson, Sharon

    2008-01-01

    In 2003, Hamilton Health Sciences embarked on an initiative to improve and standardize nursing schedules and scheduling practices. The scheduling project was one of several initiatives undertaken by a corporate-wide Nursing Resource Group established to enhance the work environment and patient care and to ensure appropriate utilization of nursing resources across the organization's five hospitals. This article focuses on major activities undertaken in the scheduling initiative. The step-by-step approach described, plus examples of the scheduling resources developed and samples of extended-tour schedules, will all provide insight, potential strategies and practical help for nursing administrators, human resources (HR) personnel and others interested in improving nurse scheduling.

  15. A cloud-based electronic medical record for scheduling, tracking, and documenting examinations and treatment of retinopathy of prematurity.

    Science.gov (United States)

    Arnold, Robert W; Jacob, Jack; Matrix, Zinnia

    2012-01-01

    Screening by neonatologists and staging by ophthalmologists is a cost-effective intervention, but inadvertent missed examinations create a high liability. Paper tracking, bedside schedule reminders, and a computer scheduling and reminder program were compared for speed of input and retrospective missed examination rate. A neonatal intensive care unit (NICU) process was then programmed for cloud-based distribution for inpatient and outpatient retinopathy of prematurity monitoring. Over 11 years, 367 premature infants in one NICU were prospectively monitored. The initial paper system missed 11% of potential examinations, the Windows server-based system missed 2%, and the current cloud-based system missed 0% of potential inpatient and outpatient examinations. Computer input of examinations took the same or less time than paper recording. A computer application with a deliberate NICU process improved the proportion of eligible neonates getting their scheduled eye examinations in a timely manner. Copyright 2012, SLACK Incorporated.

  16. Does non-standard work mean non-standard health? Exploring links between non-standard work schedules, health behavior, and well-being

    Directory of Open Access Journals (Sweden)

    Megan R. Winkler

    2018-04-01

    Full Text Available The last century has seen dramatic shifts in population work circumstances, leading to an increasing normalization of non-standard work schedules (NSWSs, defined as non-daytime, irregular hours. An ever-growing body of evidence links NSWSs to a host of non-communicable chronic conditions; yet, these associations primarily concentrate on the physiologic mechanisms created by circadian disruption and insufficient sleep. While important, not all NSWSs create such chronobiologic disruption, and other aspects of working time and synchronization could be important to the relationships between work schedules and chronic disease. Leveraging survey data from Project EAT, a population-based study with health-related behavioral and psychological data from U.S. adults aged 25–36 years, this study explored the risks for a broad range of less healthful behavioral and well-being outcomes among NSWS workers compared to standard schedule workers (n = 1402. Variations across different NSWSs (evening, night/rotating, and irregular schedules were also explored. Results indicated that, relative to standard schedule workers, workers with NSWSs are at increased risk for non-optimal sleep, substance use, greater recreational screen time, worse dietary practices, obesity, and depression. There was minimal evidence to support differences in relative risks across workers with different types of NSWSs. The findings provide insight into the potential links between NSWSs and chronic disease and indicate the relevancy social disruption and daily health practices may play in the production of health and well-being outcomes among working populations. Keywords: United States, Work schedule tolerance, Health behavior, Mental health, Substance abuse, Obesity

  17. 20 CFR 416.919n - Informing the medical source of examination scheduling, report content, and signature requirements.

    Science.gov (United States)

    2010-04-01

    ... scheduling, report content, and signature requirements. 416.919n Section 416.919n Employees' Benefits SOCIAL... medical source of examination scheduling, report content, and signature requirements. The medical sources... report containing all of the elements in paragraph (c). (e) Signature requirements. All consultative...

  18. 20 CFR 404.1519n - Informing the medical source of examination scheduling, report content, and signature requirements.

    Science.gov (United States)

    2010-04-01

    ... scheduling, report content, and signature requirements. 404.1519n Section 404.1519n Employees' Benefits... medical source of examination scheduling, report content, and signature requirements. The medical sources... report containing all of the elements in paragraph (c). (e) Signature requirements. All consultative...

  19. Examination of the Safety of Pediatric Vaccine Schedules in a Non-Human Primate Model: Assessments of Neurodevelopment, Learning, and Social Behavior

    Science.gov (United States)

    Curtis, Britni; Liberato, Noelle; Rulien, Megan; Morrisroe, Kelly; Kenney, Caroline; Yutuc, Vernon; Ferrier, Clayton; Marti, C. Nathan; Mandell, Dorothy; Burbacher, Thomas M.; Sackett, Gene P.

    2015-01-01

    the effects of pediatric vaccines on early primate development, provided no consistent evidence of neurodevelopmental deficits or aberrant behavior in vaccinated animals. Citation Curtis B, Liberato N, Rulien M, Morrisroe K, Kenney C, Yutuc V, Ferrier C, Marti CN, Mandell D, Burbacher TM, Sackett GP, Hewitson L. 2015. Examination of the safety of pediatric vaccine schedules in a non-human primate model: assessments of neurodevelopment, learning, and social behavior. Environ Health Perspect 123:579–589; http://dx.doi.org/10.1289/ehp.1408257 PMID:25690930

  20. Treatment for Acquired Apraxia of Speech: Examination of Treatment Intensity and Practice Schedule

    Science.gov (United States)

    Wambaugh, Julie L.; Nessler, Christina; Cameron, Rosalea; Mauszycki, Shannon C.

    2013-01-01

    Purpose: The authors designed this investigation to extend the development of a treatment for acquired apraxia of speech (AOS)--sound production treatment (SPT)--by examining the effects of 2 treatment intensities and 2 schedules of practice. Method: The authors used a multiple baseline design across participants and behaviors with 4 speakers with…

  1. Health Information Sources, Perceived Vaccination Benefits, and Maintenance of Childhood Vaccination Schedules.

    Science.gov (United States)

    Hwang, Juwon; Shah, Dhavan V

    2018-06-05

    Parental concerns over the safety or necessity of childhood vaccination have increased over the past decades. At the same time, there has been a proliferation of vaccine-related information available through a range of health information sources. This study investigates the associations between evaluations of health information sources, parental perceptions of childhood vaccination benefits, and the maintenance of vaccination schedules for their children. Specifically, this study aims to (a) incorporate social media into the battery of health information sources and (b) differentiate households with a childhood autism diagnosis and those without, given unsubstantiated but persistent concerns about vaccine safety and autism. Analyzing a sample of U.S. households, a total of 4,174 parents who have at least one child under the age of 18 were analyzed, including 138 of parents of households with a childhood autism diagnosis. Results show that the more the parents value interpersonal communication and magazines as sources of health information, the more they perceive vaccination benefits, and the more the value they put on television, the better they keep vaccination schedules up-to-date for their children. On the other hand, social media are negatively associated with their perceptions of vaccination benefits. Although parents of children diagnosed with autism are less likely to perceive vaccination benefits, no interaction effects with evaluations of health information sources are found on parental perceptions of vaccination benefits or maintenance of schedules.

  2. Shifting schedules: the health effects of reorganizing shift work.

    Science.gov (United States)

    Bambra, Clare L; Whitehead, Margaret M; Sowden, Amanda J; Akers, Joanne; Petticrew, Mark P

    2008-05-01

    Approximately one fifth of workers are engaged in some kind of shift work. The harmful effects of shift work on the health and work-life balance of employees are well known. A range of organizational interventions has been suggested to address these negative effects. This study undertook the systematic review (following Quality Of Reporting Of Meta [QUORUM] analyses guidelines) of experimental and quasi-experimental studies, from any country (in any language) that evaluated the effects on health and work-life balance of organizational-level interventions that redesign shift work schedules. Twenty-seven electronic databases (medical, social science, economic) were searched. Data extraction and quality appraisal were carried out by two independent reviewers. Narrative synthesis was performed. The review was conducted between October 2005 and November 2006. Twenty-six studies were found relating to a variety of organizational interventions. No one type of intervention was found to be consistently harmful to workers. However, three types were found to have beneficial effects on health and work-life balance: (1) switching from slow to fast rotation, (2) changing from backward to forward rotation, and (3) self-scheduling of shifts. Improvements were usually at little or no direct organizational cost. However, there were concerns about the generalizability of the evidence, and no studies reported on impacts on health inequalities. This review reinforces the findings of epidemiologic and laboratory-based research by suggesting that certain organizational-level interventions can improve the health of shift workers, their work-life balance, or both. This evidence could be useful when designing interventions to improve the experience of shift work.

  3. Male involvement in reproductive health among scheduled tribe: experience from Khairwars of central India.

    Science.gov (United States)

    Saha, Kalyan B; Singh, Neeru; Chatterjee Saha, Uma; Roy, Jyotirmoy

    2007-01-01

    Indian tribal men's lack of participation in reproductive health not only damages their own health, but also contributes to the reproductive ill health of their female partners and children. In India the involvement of men in such matters is a new concept. There is a paucity of data particularly on Scheduled tribesmen's knowledge and the extent of their participation in reproductive health. This inhibits planning. The present study aims to understand the involvement of Scheduled tribesmen in reproductive health and the barriers to their involvement by generating a database from the Khairwar tribe of Central India. A door-to-door survey on knowledge, attitude and practice relating to aspects of reproductive health was conducted by canvassing a pre-designed interview schedule among 15-40 year old, currently married Khairwar males in the Sidhi district of Madhya Pradesh, India. As far as reproductive morbidity is concerned, only 17% of the respondents had heard of HIV/AIDS, and most had no proper knowledge of its transmission. Although 74% of the respondents had heard about reproductive tract infections, the majority of them were unaware of the mechanism of transmission and seriousness of the problem. The duel role of condoms, both as a method of family planning and a protective measure against sexually transmitted infections, was also unknown to them. Approximately 59% of the males were aware of family planning but only 13% were using any method (mostly female sterilization) at the time of survey. Their view on the ideal number of children (3.56) exceeded the actual number of children born and living. High infant and child mortality influenced their preference for higher fertility. Very few among them (29%) had knowledge of antenatal care. They expressed faulty knowledge, myths and unhelpful attitudes towards sexual health matters. The study revealed the male Scheduled tribe population's lack of knowledge and misinformation regarding male sexual health issues, the

  4. Schedule Matters: Understanding the Relationship between Schedule Delays and Costs on Overruns

    Science.gov (United States)

    Majerowicz, Walt; Shinn, Stephen A.

    2016-01-01

    This paper examines the relationship between schedule delays and cost overruns on complex projects. It is generally accepted by many project practitioners that cost overruns are directly related to schedule delays. But what does "directly related to" actually mean? Some reasons or root causes for schedule delays and associated cost overruns are obvious, if only in hindsight. For example, unrealistic estimates, supply chain difficulties, insufficient schedule margin, technical problems, scope changes, or the occurrence of risk events can negatively impact schedule performance. Other factors driving schedule delays and cost overruns may be less obvious and more difficult to quantify. Examples of these less obvious factors include project complexity, flawed estimating assumptions, over-optimism, political factors, "black swan" events, or even poor leadership and communication. Indeed, is it even possible the schedule itself could be a source of delay and subsequent cost overrun? Through literature review, surveys of project practitioners, and the authors' own experience on NASA programs and projects, the authors will categorize and examine the various factors affecting the relationship between project schedule delays and cost growth. The authors will also propose some ideas for organizations to consider to help create an awareness of the factors which could cause or influence schedule delays and associated cost growth on complex projects.

  5. Instructions, multiple schedules, and extinction: Distinguishing rule-governed from schedule-controlled behavior.

    Science.gov (United States)

    Hayes, S C; Brownstein, A J; Haas, J R; Greenway, D E

    1986-09-01

    Schedule sensitivity has usually been examined either through a multiple schedule or through changes in schedules after steady-state responding has been established. This study compared the effects of these two procedures when various instructions were given. Fifty-five college students responded in two 32-min sessions under a multiple fixed-ratio 18/differential-reinforcement-of-low-rate 6-s schedule, followed by one session of extinction. Some subjects received no instructions regarding the appropriate rates of responding, whereas others received instructions to respond slowly, rapidly, or both. Relative to the schedule in operation, the instructions were minimal, partially inaccurate, or accurate. When there was little schedule sensitivity in the multiple schedule, there was little in extinction. When apparently schedule-sensitive responding occurred in the multiple schedule, however, sensitivity in extinction occurred only if differential responding in the multiple schedule could not be due to rules supplied by the experimenter. This evidence shows that rule-governed behavior that occurs in the form of schedule-sensitive behavior may not in fact become schedule-sensitive even though it makes contact with the scheduled reinforcers.

  6. An examination of the factors affecting people's participation in future health examinations based on community health exam interventions.

    Science.gov (United States)

    Tu, Shih-Kai; Liao, Hung-En

    2014-01-01

    Community-based intervention health examinations were implemented at a health care facility to comply with the government's primary health care promotion policy. The theory of planned behavior model was applied to examine the effect that community-based health examinations had on people's health concepts regarding seeking future health examinations. The research participants were individuals who had received a health examination provided at two branches of a hospital in central Taiwan in 2012. The hospital's two branches held a total of 14 free community-based health examination sessions. The hospital provided health examination equipment and staff to perform health examinations during public holidays. We conducted an exploratory questionnaire survey to collect data and implemented cross-sectional research based on anonymous self-ratings to examine the public's intention to receive future community-based or hospital-based health examinations. Including of 807 valid questionnaires, accounting for 89.4% of the total number of questionnaires distributed. The correlation coefficients of the second-order structural model indicate that attitudes positively predict behavioral intentions (γ = .66, p intentions (γ = .66, p intentions (γ = -.71, p > .05). The results of the first-order structural model indicated that the second-order constructs had a high explanatory power for the first-order constructs. People's health concepts regarding health examinations and their desire to continue receiving health examinations must be considered when promoting health examinations in the community. Regarding hospital management and the government's implementation of primary health care, health examination services should address people's medical needs to increase coverage and participation rates and reduce the waste of medical resources.

  7. Examining the Role of Race, Ethnicity, and Gender on Social and Behavioral Ratings within the Autism Diagnostic Observation Schedule

    Science.gov (United States)

    Harrison, Ashley J.; Long, Kristin A.; Tommet, Douglas C.; Jones, Richard N.

    2017-01-01

    The Autism Diagnostic Observation Schedule (ADOS) is widely used to assess symptoms of autism spectrum disorder (ASD). Given well-documented differences in social behaviors across cultures, this study examined whether item-level biases exist in ADOS scores across sociodemographic groups (race, ethnicity, and gender). We examined a subset of ten…

  8. Initial examination of the effects of overtime and shift scheduling on nuclear power plant safety performance

    International Nuclear Information System (INIS)

    Baker, K.; Olson, J.; Montgomery, J.

    1990-01-01

    The research reported here uses currently available data to begin to document overtime and shift scheduling practices in the nuclear industry and assess their safety consequences. Overtime and the 12-hour shift schedule have been found to affect employee fatigue and human error in other industries but neither of these practices have been systematically researched within the nuclear industry. Overtime has long been a standard practice in the nuclear industry and, recently, several licensees have adopted a 12-hour shift schedule for control room operations crews. Although 12-hour shifts have certain benefits for the employer and employee alike (e.g., can require fewer total employees and provide longer periods of time-off) there is some concern that the 12-hour shift may produce greater employee fatigue. Moreover, the 12-hour shift may exacerbate the negative effect of overtime. The potential effect of human error in the nuclear industry for the health and safety of both nuclear power plant workers and the general public requires that these practices be assessed. Data on overtime practices was obtained from the International Brotherhood of Electrical Workers (IBEW) for plants covered by the bargaining unit - approximately 63% of the total number of operating plants. Information on operator shift schedule was collected from all operating plants in 1987 by the NRC. The research produced fairly strong evidence that greater amounts of overtime worked by operators is associated with a greater number of operational problems

  9. Applicability of Markets to Global Scheduling in Grids: Critical Examination of General Equilibrium Theory and Market Folklore

    Science.gov (United States)

    Nakai, Junko; VanDerWijngaart, Rob F.

    2003-01-01

    Markets are often considered superior to other global scheduling mechanisms for distributed computing systems. This claim is supported by: a casual observation from our every-day life that markets successfully equilibrate supply and demand, and the features of markets which originate in the general equilibrium theory, e.g., efficiency and the lack of necessity of 2 central controller. This paper describes why such beliefs in markets are not warranted. It does so by examining the general equilibrium theory, in terms of scope, abstraction, and interpretation. Not only does the general equilibrium theory fail to provide a satisfactory explanation of actual economies, including a computing-resource economy, it also falls short of supplying theoretical foundations for commonly held views of market desirability. This paper also points out that the argument for the desirability of markets involves circular reasoning and that the desirability can be established only vis-a-vis a scheduling goal. Finally, recasting the conclusion of Arrow's Impossibility Theorem as that for global scheduling, we conclude that there exists no market-based scheduler that is rational (in the sense defined in microeconomic theory), takes into account utility of more than one user, and yet yields a Pareto-optimal outcome for arbitrary user utility functions.

  10. Analysis of Issues for Project Scheduling by Multiple, Dispersed Schedulers (distributed Scheduling) and Requirements for Manual Protocols and Computer-based Support

    Science.gov (United States)

    Richards, Stephen F.

    1991-01-01

    Although computerized operations have significant gains realized in many areas, one area, scheduling, has enjoyed few benefits from automation. The traditional methods of industrial engineering and operations research have not proven robust enough to handle the complexities associated with the scheduling of realistic problems. To address this need, NASA has developed the computer-aided scheduling system (COMPASS), a sophisticated, interactive scheduling tool that is in wide-spread use within NASA and the contractor community. Therefore, COMPASS provides no explicit support for the large class of problems in which several people, perhaps at various locations, build separate schedules that share a common pool of resources. This research examines the issue of distributing scheduling, as applied to application domains characterized by the partial ordering of tasks, limited resources, and time restrictions. The focus of this research is on identifying issues related to distributed scheduling, locating applicable problem domains within NASA, and suggesting areas for ongoing research. The issues that this research identifies are goals, rescheduling requirements, database support, the need for communication and coordination among individual schedulers, the potential for expert system support for scheduling, and the possibility of integrating artificially intelligent schedulers into a network of human schedulers.

  11. How do employees prioritise when they schedule their own shifts?

    Science.gov (United States)

    Nabe-Nielsen, Kirsten; Lund, Henrik; Ajslev, Jeppe Z; Hansen, Åse Marie; Albertsen, Karen; Hvid, Helge; Garde, Anne Helene

    2013-01-01

    We investigated how employees prioritised when they scheduled their own shifts and whether priorities depended on age, gender, educational level, cohabitation and health status. We used cross-sectional questionnaire data from the follow-up survey of an intervention study investigating the effect of self-scheduling (n = 317). Intervention group participants were asked about their priorities when scheduling their own shifts succeeded by 17 items covering family/private life, economy, job content, health and sleep. At least half of the participants reported that they were giving high priority to their family life, having consecutive time off, leisure-time activities, rest between shifts, sleep, regularity of their everyday life, health and that the work schedule balanced. Thus, employees consider both their own and the workplace's needs when they have the opportunity to schedule their own shifts. Age, gender, cohabitation and health status were all significantly associated with at least one of these priorities. Intervention studies report limited health effects of self-scheduling. Therefore, we investigated to what extent employees prioritise their health and recuperation when scheduling their own shifts. We found that employees not only consider both their health and family but also the workplace's needs when they schedule their own shifts.

  12. Examining the Factor Structure of the Positive and Negative Affect Schedule (PANAS) in a Multiethnic Sample of Adolescents

    Science.gov (United States)

    Villodas, Feion; Villodas, Miguel T.; Roesch, Scott

    2011-01-01

    The psychometric properties of the Positive and Negative Affect Schedule were examined in a multiethnic sample of adolescents. Results from confirmatory factor analyses indicated that the original two-factor model did not adequately fit the data. Exploratory factor analyses revealed that four items were not pure markers of the factors. (Contains 1…

  13. Automated scheduling and planning from theory to practice

    CERN Document Server

    Ozcan, Ender; Urquhart, Neil

    2013-01-01

      Solving scheduling problems has long presented a challenge for computer scientists and operations researchers. The field continues to expand as researchers and practitioners examine ever more challenging problems and develop automated methods capable of solving them. This book provides 11 case studies in automated scheduling, submitted by leading researchers from across the world. Each case study examines a challenging real-world problem by analysing the problem in detail before investigating how the problem may be solved using state of the art techniques.The areas covered include aircraft scheduling, microprocessor instruction scheduling, sports fixture scheduling, exam scheduling, personnel scheduling and production scheduling.  Problem solving methodologies covered include exact as well as (meta)heuristic approaches, such as local search techniques, linear programming, genetic algorithms and ant colony optimisation.The field of automated scheduling has the potential to impact many aspects of our lives...

  14. Examining the Cultural Validity of Fear Survey Schedule for Children: The Contemporary Fears of Turkish Children and Adolescents

    Science.gov (United States)

    Serim-Yildiz, Begum; Erdur-Baker, Ozgur

    2013-01-01

    The authors examined the cultural validity of Fear Survey Schedule for Children (FSSC-AM) developed by J. J. Burnham (2005) with Turkish children. The relationships between demographic variables and the level of fear were also tested. Three independent data sets were used. The first data set comprised 676 participants (321 women and 355 men) and…

  15. Who benefits from family support? Work schedule and family differences.

    Science.gov (United States)

    Jennings, Kristen S; Sinclair, Robert R; Mohr, Cynthia D

    2016-01-01

    Prior research has demonstrated the benefits of family-supportive organization perceptions (FSOP) for reducing stress, increasing satisfaction, and increasing worker commitment; however, less research has studied health outcomes or possible differences in the effects of FSOP based on worker characteristics. The present study examined relationships between FSOP and health outcomes, as well as how those relationships may depend on work schedule and family differences. Using a sample of 330 acute care nurses, the findings indicated that FSOP predicted several health and well-being outcomes obtained 9 months later. Further, the relationships between FSOP and the outcome variables depended on some work schedule and family differences. In terms of family differences, FSOP was most strongly related to life satisfaction for those who cared for dependent adults. The relationship between FSOP and health outcomes of depression, musculoskeletal pain, and physical health symptoms were generally significant for workers with dependent children, but not significant for workers with no children. Regarding schedule differences, the relationship between FSOP and life satisfaction was significant for those on nonstandard (evening/night) shifts but not significant for standard day shift workers; however, there were no differences in FSOP relationships by number of hours worked per week. The findings demonstrate that FSOP may benefit some employees more than others. Such differences need to be incorporated into both future work-family theory development and into efforts to document the effectiveness of family-supportive policies, programs, and practices. (c) 2016 APA, all rights reserved).

  16. CMS Records Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — The CMS Records Schedule provides disposition authorizations approved by the National Archives and Records Administration (NARA) for CMS program-related records...

  17. Perceptions of randomized security schedules.

    Science.gov (United States)

    Scurich, Nicholas; John, Richard S

    2014-04-01

    Security of infrastructure is a major concern. Traditional security schedules are unable to provide omnipresent coverage; consequently, adversaries can exploit predictable vulnerabilities to their advantage. Randomized security schedules, which randomly deploy security measures, overcome these limitations, but public perceptions of such schedules have not been examined. In this experiment, participants were asked to make a choice between attending a venue that employed a traditional (i.e., search everyone) or a random (i.e., a probability of being searched) security schedule. The absolute probability of detecting contraband was manipulated (i.e., 1/10, 1/4, 1/2) but equivalent between the two schedule types. In general, participants were indifferent to either security schedule, regardless of the probability of detection. The randomized schedule was deemed more convenient, but the traditional schedule was considered fairer and safer. There were no differences between traditional and random schedule in terms of perceived effectiveness or deterrence. Policy implications for the implementation and utilization of randomized schedules are discussed. © 2013 Society for Risk Analysis.

  18. Examining Master Schedule Practices in Rio Grande Valley Schools: Effects on Student Attendance, Discipline, and Grade Point Averages

    Science.gov (United States)

    Carriaga, Benito T.

    2012-01-01

    This study evaluated the impact of the master schedule design on student attendance, discipline, and grade point averages. Unexcused and excused absences, minor and major infraction, and grade point averages in three high schools during the 2008-09 and 2009-10 school years were included in the study. The purpose was to examine if any difference…

  19. Effects of requested, forced and denied shift schedule change on work ability and health of nurses in Europe -results from the European NEXT-Study.

    Science.gov (United States)

    Galatsch, Michael; Li, Jian; Derycke, Hanne; Müller, Bernd Hans; Hasselhorn, Hans Martin

    2013-12-05

    Previous cross-sectional findings from the European Nurses Early Exit Study (NEXT) show that nurses who were dissatisfied with their work schedule tended to consider leaving the nursing profession. Mediating factors in this decision process may be caused by self-perceived poor work ability and/or health. The aim of this paper is to investigate changes in work ability and general health among nurses in relation to requested, forced and denied change of shift schedule. Longitudinal data from the NEXT Study was used. In total 11,102 nurses from Belgium, Germany, Finland, the Netherlands, Poland, Slovakia, France and Italy completed both the 'basic questionnaire' (t1) and the '12 month follow-up questionnaire' (t2). To examine the time-effect (repeated measures) and the group-effect of five defined groups of nurses on the Work Ability Index (WAI) and general health (SF36), an adjusted 2-way analysis of covariance (ANCOVA) was performed. The nurses who wanted to, but could not change their shifts during the 12 month follow-up had the lowest initial and follow-up scores for WAI (t1: 37.6, t2: 36.6, p work ability and to a lesser comparatively low extent with increased decline in health scores. A forced change of shift against the nurses' will was significantly associated with a deteriorating work ability and health. The findings would suggest that nurses' desire to change their shift patterns may be an indicator for perceived low work ability and/or low health. The results also indicate that fulfilling nurses' wishes with respect to their shift work pattern may improve their personal resources such as work ability and - to somewhat lesser extent - health. Disregarding nurses' preferences, however, bears the risk for further resource deterioration. The findings imply that shift schedule organization may constitute a valuable preventive tool to promote nurses' work ability and - to lesser extent - their perceived health, not least in aging nursing work forces.

  20. DMEPOS Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — The list contains the fee schedule amounts, floors, and ceilings for all procedure codes and payment category, jurisdication, and short description assigned to each...

  1. Shiftwork Scheduling for the 1990s.

    Science.gov (United States)

    Coleman, Richard M.

    1989-01-01

    The author discusses the problems of scheduling shift work, touching on such topics as employee desires, health requirements, and business needs. He presents a method for developing shift schedules that addresses these three areas. Implementation hints are also provided. (CH)

  2. Prioritized schedule for review of industrial safety and occupational health programs

    International Nuclear Information System (INIS)

    1996-12-01

    This document provides the rationale and criteria for developing a schedule for reviewing the Industrial Safety and Occupational Health programs for the Management and Operating Contractor (MOC) of the Waste Isolation Pilot Plant. The reviews will evaluate the MOC's compliance with applicable Department of Energy (DOE) orders and regulatory requirements. The scope of this task includes developing prioritization criteria, determining the review priority of each program based upon the criteria, identifying review requirements for each program, and preparing a detailed review schedule. In keeping with the Carlsbad Area Office (CAO) structure for the review of site activities, these review activities will be addressed as surveillances, although the original basis for this requirement refers to these activities as appraisals. Surveillances and appraisals are the same within this document. Surveillances are defined as: ''The act of monitoring or observing to verify whether an item, activity, system, or process conforms to specified requirements. Surveillance of a technical work activity is normally done in real time, i.e., the surveillance is accomplished as the work is being performed.''

  3. 42 CFR 414.620 - Publication of the ambulance fee schedule.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Publication of the ambulance fee schedule. 414.620... SERVICES (CONTINUED) MEDICARE PROGRAM PAYMENT FOR PART B MEDICAL AND OTHER HEALTH SERVICES Fee Schedule for Ambulance Services § 414.620 Publication of the ambulance fee schedule. Changes in payment rates resulting...

  4. DME Prosthetics Orthotics, and Supplies Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — Durable Medical Equipment, Prosthetics-Orthotics, and Supplies Fee Schedule. The list contains the fee schedule amounts, floors, and ceilings for all procedure codes...

  5. No difference in self reported health among coalminers in two different shift schedules at Spitsbergen, Norway, a two years follow-up.

    Science.gov (United States)

    Hanoa, Rolf; Baste, Valborg; Kooij, Arne; Sommervold, Linda; Moen, Bente Elisabeth

    2011-01-01

    This study was performed among coal miners in the remote location Svea, Spitsbergen. The shift schedule used to be 7 d on and 7 d off. The aim of this study was to investigate possible changes in health after a voluntary implementation of a new shift schedule, with periods of 14 d on and 14 d off, for 74 percent of the workers in 2007. A questionnaire was distributed to all employees before and two times after the new shift schedule, comprising questions on type of work, shift schedule, pain, sleep, stress and coping. Ninety nine percent of the employees responded; 274 in 2006, 307 in 2007 and 312 in 2008. Work neither in the 14/14 shift nor 7/7 shift was related to any change in the health after these two years. The coping index for workers in the 14/14 shift improved.

  6. Shift schedules, work factors, and mental health among onshore and offshore workers in the Norwegian petroleum industry

    Science.gov (United States)

    BERTHELSEN, Mona; PALLESEN, Ståle; BJORVATN, Bjørn; KNARDAHL, Stein

    2015-01-01

    The purpose of the present study was to answer the following research questions: (1) Do workers in different shift schedules differ in mental distress? (2) Do workers in different shift schedules differ in neuroticism? (3) Do shift schedules differ in psychosocial work exposures? (4) Do psychosocial work exposures contribute to mental distress among onshore- and offshore workers? (5) Does neuroticism confound the association between work exposures and mental distress? Workers on six shift-schedules answered a questionnaire (1,471 of 2,628 employees). Psychological and social work factors were measured by QPSNordic, mental distress was measured by HADS and neuroticism was measured by EPQ. The results showed 1) No differences in mental distress between workers in different shift schedules, 2) Revolving-shift workers reported higher neuroticism compared to day workers, 3) Swing-shift workers and revolving-shift workers reported lower job control compared to permanent-night and -day workers, 4) Job demands and role conflict were associated with more mental distress. Job control, role clarity, support, and leadership were associated with lower mental distress, 5) Neuroticism influenced the relationship between psychosocial work factors and mental distress. The present study did not find differences in mental distress between shift schedules. Job characteristics may be contributing factors when determining health effects of shift work. PMID:25740007

  7. Service user engagement: A co-created interview schedule exploring mental health recovery in young adults.

    Science.gov (United States)

    McCauley, Claire-Odile; McKenna, Hugh; Keeney, Sinead; McLaughlin, Derek

    2017-10-01

    The aim of this study was to co-create of an interview schedule exploring mental health recovery in collaboration with young adult service users. Service user involvement in research has been increasingly recognized as providing a vital authentic insight into mental health recovery. Engagement and collaboration with service users have facilitated the exploration of inaccessible or under-investigated aspects of the lived experience of mental health recovery, not only directing the trajectory of research, but making it relevant to their own contextual experience. A qualitative content analysis framework was employed in the co-creation of a semi-structured interview schedule through an engagement process with service users. Two separate engagement groups took place at the premises of the service user organizations, between January - February 2014. Miles and Huberman's analysis framework was chosen for this phase as it enabled the visual presentation of factors, concepts or variables and the established relationship between them. The lived experience of mental ill health in young adulthood and how this was understood by others was a particularly relevant theme for participants. Further themes were identified between the impact of painful experiences at this developmental life stage leading to a deeper understanding of others through finding meaning in their own mental health recovery journey. Our findings identified that suffering painful experiences is an integral aspect in the process of mental health recovery. This understanding has particular relevance to mental health nursing practice, ensuring the care delivered is cognizant of the suffering or painful experiences that young adults are encountering. © 2017 John Wiley & Sons Ltd.

  8. Scheduling the scheduling task : a time management perspective on scheduling

    NARCIS (Netherlands)

    Larco Martinelli, J.A.; Wiers, V.C.S.; Fransoo, J.C.

    2013-01-01

    Time is the most critical resource at the disposal of schedulers. Hence, an adequate management of time from the schedulers may impact positively on the scheduler’s productivity and responsiveness to uncertain scheduling environments. This paper presents a field study of how schedulers make use of

  9. How do employees prioritise when they schedule their own shifts?

    DEFF Research Database (Denmark)

    Nabe-Nielsen, Kirsten; Lund, Henrik; Hansen, Åse Marie

    2013-01-01

    to their family life, having consecutive time off, leisure-time activities, rest between shifts, sleep, regularity of their everyday life, health and that the work schedule balanced. Thus, employees consider both their own and the workplace's needs when they have the opportunity to schedule their own shifts. Age......We investigated how employees prioritised when they scheduled their own shifts and whether priorities depended on age, gender, educational level, cohabitation and health status. We used cross-sectional questionnaire data from the follow-up survey of an intervention study investigating the effect...... of self-scheduling (n = 317). Intervention group participants were asked about their priorities when scheduling their own shifts succeeded by 17 items covering family/private life, economy, job content, health and sleep. At least half of the participants reported that they were giving high priority...

  10. Brief-stimulus presentations on multiform tandem schedules

    OpenAIRE

    Reed, Phil

    1994-01-01

    Three experiments examined the influence of a brief stimulus (a light) on the behavior of food-deprived rats whose lever pressing on tandem schedules comprising components of different schedule types resulted in food presentation. In Experiment 1, either a tandem variable-ratio variable-interval or a tandem variable-interval variable-ratio schedule was used. The variable-interval requirement in the tandem variable-ratio variable-interval schedule was yoked to the time taken to complete the va...

  11. [Work schedules in the Hungarian health care system and the sleep quality of nurses].

    Science.gov (United States)

    Fusz, Katalin; Pakai, Annamária; Kívés, Zsuzsanna; Szunomár, Szilvia; Regős, Annamária; Oláh, András

    2016-03-06

    One way of ensuring the continuity of health care is the shift work, which is burdensome and it can lead to sleep disturbances. The aim of the study was to measure the typical Hungarian nursing shift systems in hospitals, to analyse the causes of irregular work schedules, and to compare the sleep quality of nurses in different work schedules. 236 head nurses filled out the national online survey, and 217 nurses in clinics of the University of Pécs filled the Hungarian version of Bergen Shift Work Sleep Questionnaire. The head nurses provided data of 8697 nurses's schedules. 51.89% of nurses work in flexible shift system. 1944 employees work in regular shift system, most of them in the following order: 12-hour day shift and 12-hour night shift, followed by a one- or two-day rest. Where there is no system of shifts, the most frequent causes are the needs of nurses and the nurse shortage. Nurses who are working in irregular shift system had worse sleep quality than nurses who are working in flexible and regular shift system (p = 0.044). It would be helpful if the least burdensome shift system could be established.

  12. Efficient Academic Scheduling at the U.S. Naval Academy

    National Research Council Canada - National Science Library

    Zane, David

    2003-01-01

    This research project examined academic scheduling problems at the U.S. Naval Academy. The focus was on devising methods to construct good final exam schedules and improve existing course schedules by facilitation course changes...

  13. Physician Fee Schedule Search

    Data.gov (United States)

    U.S. Department of Health & Human Services — This website is designed to provide information on services covered by the Medicare Physician Fee Schedule (MPFS). It provides more than 10,000 physician services,...

  14. Distributing Flexibility to Enhance Robustness in Task Scheduling Problems

    NARCIS (Netherlands)

    Wilmer, D.; Klos, T.B.; Wilson, M.

    2013-01-01

    Temporal scheduling problems occur naturally in many diverse application domains such as manufacturing, transportation, health and education. A scheduling problem arises if we have a set of temporal events (or variables) and some constraints on those events, and we have to find a schedule, which is

  15. Clinical Laboratory Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — Outpatient clinical laboratory services are paid based on a fee schedule in accordance with Section 1833(h) of the Social Security Act. The clinical laboratory fee...

  16. Factors associated with shift work disorder in nurses working with rapid-rotation schedules in Japan: the nurses' sleep health project.

    Science.gov (United States)

    Asaoka, Shoichi; Aritake, Sayaka; Komada, Yoko; Ozaki, Akiko; Odagiri, Yuko; Inoue, Shigeru; Shimomitsu, Teruichi; Inoue, Yuichi

    2013-05-01

    Workers who meet the criteria for shift work disorder (SWD) have elevated levels of risk for various health and behavioral problems. However, the impact of having SWD on shiftworkers engaged in rapid-rotation schedules is unknown. Moreover, the risk factors for the occurrence of SWD remain unclear. To clarify these issues, we conducted a questionnaire-based, cross-sectional survey on a sample of shiftworking nurses. Responses were obtained from 1202 nurses working at university hospitals in Tokyo, Japan, including 727 two-shift workers and 315 three-shift workers. The questionnaire included items relevant to age, gender, family structure, work environment, health-related quality of life (QOL), diurnal type, depressive symptoms, and SWD. Participants who reported insomnia and/or excessive sleepiness for at least 1 mo that was subjectively relevant to their shiftwork schedules were categorized as having SWD. The prevalence of SWD in the sampled shiftworking nurses was 24.4%; shiftworking nurses with SWD showed lower health-related QOL and more severe depressive symptoms, with greater rates of both actual accidents/errors and near misses, than those without SWD. The results of logistic regression analyses showed that more time spent working at night, frequent missing of nap opportunities during night work, and having an eveningness-oriented chronotype were significantly associated with SWD. The present study indicated that SWD might be associated with reduced health-related QOL and decreased work performance in shiftworking nurses on rapid-rotation schedules. The results also suggested that missing napping opportunities during night work, long nighttime working hours, and the delay of circadian rhythms are associated with the occurrence of SWD among shiftworking nurses on rapid-rotation schedules.

  17. A systematic review of population health interventions and Scheduled Tribes in India

    Directory of Open Access Journals (Sweden)

    Labonté Ronald

    2010-07-01

    Full Text Available Abstract Background Despite India's recent economic growth, health and human development indicators of Scheduled Tribes (ST or Adivasi (India's indigenous populations lag behind national averages. The aim of this review was to identify the public health interventions or components of these interventions that are effective in reducing morbidity or mortality rates and reducing risks of ill health among ST populations in India, in order to inform policy and to identify important research gaps. Methods We systematically searched and assessed peer-reviewed literature on evaluations or intervention studies of a population health intervention undertaken with an ST population or in a tribal area, with a population health outcome(s, and involving primary data collection. Results The evidence compiled in this review revealed three issues that promote effective public health interventions with STs: (1 to develop and implement interventions that are low-cost, give rapid results and can be easily administered, (2: a multi-pronged approach, and (3: involve ST populations in the intervention. Conclusion While there is a growing body of knowledge on the health needs of STs, there is a paucity of data on how we can address these needs. We provide suggestions on how to undertake future population health intervention research with ST populations and offer priority research avenues that will help to address our knowledge gap in this area.

  18. Fee Schedules - General Information

    Data.gov (United States)

    U.S. Department of Health & Human Services — A fee schedule is a complete listing of fees used by Medicare to pay doctors or other providers-suppliers. This comprehensive listing of fee maximums is used to...

  19. Parental work schedules and child overweight and obesity.

    Science.gov (United States)

    Champion, S L; Rumbold, A R; Steele, E J; Giles, L C; Davies, M J; Moore, V M

    2012-04-01

    Studies in school-age children have consistently shown a positive association between maternal paid work hours and child obesity. However, there is conflicting evidence about the impact of maternal work hours scheduled at nonstandard times (for example, evenings, nights or weekends), and no previous examination of paternal work schedules and child weight. We examined the associations between maternal, paternal and combined parental paid work schedules and overweight/obesity in children at age 9 years. Data were analysed from the most recent follow-up of 9-year-old children (n=434) in an Australian birth cohort study. Children were measured and classified as overweight/obese using the International Obesity Taskforce body mass index cutoff points. Current working conditions of parents were obtained from a structured interview with the primary caregiver. Logistic regression analyses were used to investigate the effect of parental work schedules on child overweight/obesity with adjustment for a range of sociodemographic and household factors associated with parental employment and child weight. At 9 years of age, 99 children (22.8%) were overweight or obese. When parental work schedules were examined separately, child overweight/obesity was significantly associated with paternal nonstandard work schedules (adjusted odds ratio (OR) 1.97, 95% confidence interval (CI) 1.08-3.61). There was no association with any type of maternal work schedule. We also found an association between child overweight/obesity and circumstances in which both parents worked nonstandard schedules; however, this was of borderline statistical significance in the adjusted models (adjusted OR 2.26, 95% CI 0.99-5.16). Work hours scheduled at nonstandard times, when worked by the father or both parents, were associated with child overweight and obesity. These findings indicate the potential importance of fathers' paid work arrangements for child overweight/obesity, which until recently has largely

  20. The Korean social life, health and aging project-health examination cohort

    Directory of Open Access Journals (Sweden)

    Ju-Mi Lee

    2014-05-01

    Full Text Available The Korean Social Life, Health, and Aging Project (KSHAP is a population-based longitudinal study of health determinants among elderly Koreans. The target population of the KSHAP are people aged 60 years or older and their spouses living in a rural community of Korea. A complete enumeration survey was conducted in the first wave of the KSHAP on 94.7% (814 of 860 of the target population between December 2011 and July 2012. The KSHAP-Health Examination (KSHAP-HE cohort consists of 698 people who completed additional health examinations at a public health center (n=533 or at their home (n=165. Face-to-face questionnaires were used to interview participants on their demographics, social network characteristics, medical history, health behaviors, cognitive function, and depression symptoms. Health center examinations included anthropometric measures, body impedance analysis, resting blood pressure measurement, radial artery tonometry, bone densitometry, the timed up-and-go test, and fasting blood analysis. However, only anthropometric measures, blood pressure measurement, and non-fasting blood analysis were available for home health examinations. Collaboration is encouraged and access to the KSHAP baseline data will be available via the website of the Korean Social Science Data Archive (http://www.kossda.or.kr.

  1. Nontraditional work schedules for pharmacists.

    Science.gov (United States)

    Mahaney, Lynnae; Sanborn, Michael; Alexander, Emily

    2008-11-15

    Nontraditional work schedules for pharmacists at three institutions are described. The demand for pharmacists and health care in general continues to increase, yet significant material changes are occurring in the pharmacy work force. These changing demographics, coupled with historical vacancy rates and turnover trends for pharmacy staff, require an increased emphasis on workplace changes that can improve staff recruitment and retention. At William S. Middleton Memorial Veterans Affairs Hospital in Madison, Wisconsin, creative pharmacist work schedules and roles are now mainstays to the recruitment and retention of staff. The major challenge that such scheduling presents is the 8 hours needed to prepare a six-week schedule. Baylor Medical Center at Grapevine in Dallas, Texas, has a total of 45 pharmacy employees, and slightly less than half of the 24.5 full-time-equivalent staff work full-time, with most preferring to work one, two, or three days per week. As long as the coverage needs of the facility are met, Envision Telepharmacy in Alpine, Texas, allows almost any scheduling arrangement preferred by individual pharmacists or the pharmacist group covering the facility. Staffing involves a great variety of shift lengths and intervals, with shifts ranging from 2 to 10 hours. Pharmacy leaders must be increasingly aware of opportunities to provide staff with unique scheduling and operational enhancements that can provide for a better work-life balance. Compressed workweeks, job-sharing, and team scheduling were the most common types of alternative work schedules implemented at three different institutions.

  2. Planning and Scheduling of Airline Operations

    Directory of Open Access Journals (Sweden)

    İlkay ORHAN

    2010-02-01

    Full Text Available The Turkish Civil Aviation sector has grown at a rate of 53 % between the years 2002-2008 owing to countrywide economical developments and some removed restrictions in the aviation field. Successful international companies in the sector use advanced computer-supported solution methods for their planning and scheduling problems. These methods have been providing significant competitive advantages to those companies. There are four major scheduling and planning problems in the airline sector: flight scheduling, aircraft scheduling, crew scheduling and disruptions management. These aforementioned scheduling and planning problems faced by all airline companies in the airline sector were examined in detail. Studies reveal that companies using the advanced methods might gain significant cost reductions. However, even then, the time required for solving large scale problems may not satisfy the decision quality desired by decision makers. In such cases, using modern decision methods integrated with advanced technologies offer companies an opportunity for significant cost-advantages.

  3. How much do workers' health examinations add to health and safety at the workplace? Occupational preventive usefulness of routine health examinations.

    Science.gov (United States)

    Rodríguez-Jareño, Maria Cruz; Molinero, Emilia; de Montserrat, Jaume; Vallès, Antoni; Aymerich, Marta

    2015-01-01

    Despite no evidence in favour, routine workers' health examinations, mostly pre-employment and periodic, are extensively performed worldwide with important allocation of resources. In Spain they are performed within a theoretical job-specific health surveillance system. Our objective was to ascertain their occupational preventive usefulness from the perspective of occupational health professionals. Cross sectional study. Online survey addressed to all physicians and nurses members of the Catalan Society of Safety and Occupational Medicine (n=539) in 2011. Univariate and bivariate analyses of prevalence and prevalence differences of answers. Response rate 53% (n=285). According to more than 70% of respondents the health surveillance system isn't cost-effective, doesn't meet the goal of early detection of health damage related to work, and doesn't contribute to improve the occupational risk prevention system. Further deficiencies were identified regarding specificity and scientific basis for health examinations, quality of collective health surveillance and referral of suspected cases to mutual insurance companies for diagnosis and treatment. Bivariate analysis showed a significantly more negative opinion for several items amongst physicians (versus nurses) and amongst professionals working in external prevention services (versus internal services). This study raises serious concerns about how health examinations are performed within our workers' health surveillance system, which should be reviewed to ensure the fulfilment of its occupational preventive objective. Our results might encourage other countries with similar practices to assess them in order to assure their fitness for purpose. Copyright © 2014 SESPAS. Published by Elsevier Espana. All rights reserved.

  4. 29 CFR 1952.211 - Developmental schedule.

    Science.gov (United States)

    2010-07-01

    ... Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR... schedule. (a) Occupational health study accepted and implementation begun July, 1973; (b) Compliance Manual developed by July, 1973; (c) Management Information System, December, 1975; (d) Training in compliance...

  5. 29 CFR 1952.201 - Developmental schedule.

    Science.gov (United States)

    2010-07-01

    ... Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR... schedule. (a) Retraining of present occupational safety and health personnel during March-May 1973; (b... legislation, August 1, 1973; (d) Regulations on variances, August 1973; (e) Management information system...

  6. Heterogeneous Effects of a Nonlinear Price Schedule for Outpatient Care.

    Science.gov (United States)

    Farbmacher, Helmut; Ihle, Peter; Schubert, Ingrid; Winter, Joachim; Wuppermann, Amelie

    2017-10-01

    Nonlinear price schedules generally have heterogeneous effects on health-care demand. We develop and apply a finite mixture bivariate probit model to analyze whether there are heterogeneous reactions to the introduction of a nonlinear price schedule in the German statutory health insurance system. In administrative insurance claims data from the largest German health insurance plan, we find that some individuals strongly react to the new price schedule while a second group of individuals does not react. Post-estimation analyses reveal that the group of the individuals who do not react to the reform includes the relatively sick. These results are in line with forward-looking behavior: Individuals who are already sick expect that they will hit the kink in the price schedule and thus are less sensitive to the co-payment. Copyright © 2016 John Wiley & Sons, Ltd. Copyright © 2016 John Wiley & Sons, Ltd.

  7. National Health and Nutrition Examination Survey (NHANES)

    Data.gov (United States)

    U.S. Department of Health & Human Services — 1999-2000 forward. The National Health and Nutrition Examination Survey (NHANES) is a program of studies designed to assess the health and nutritional status of...

  8. Examining the Structure of the Schedule of Sexist Events: Replication and Extension

    National Research Council Canada - National Science Library

    Matteson, Alicia

    2004-01-01

    ... at Work/School," and "Unfair Treatment in Distant and Close Relationships" subscales Recommendations are made for the future use of these proposed subscales in conjunction with total scale scores in research using the SSE to examine links between reported experiences of sexist events and women's health and well-being.

  9. Mathematical programming and financial objectives for scheduling projects

    CERN Document Server

    Kimms, Alf

    2001-01-01

    Mathematical Programming and Financial Objectives for Scheduling Projects focuses on decision problems where the performance is measured in terms of money. As the title suggests, special attention is paid to financial objectives and the relationship of financial objectives to project schedules and scheduling. In addition, how schedules relate to other decisions is treated in detail. The book demonstrates that scheduling must be combined with project selection and financing, and that scheduling helps to give an answer to the planning issue of the amount of resources required for a project. The author makes clear the relevance of scheduling to cutting budget costs. The book is divided into six parts. The first part gives a brief introduction to project management. Part two examines scheduling projects in order to maximize their net present value. Part three considers capital rationing. Many decisions on selecting or rejecting a project cannot be made in isolation and multiple projects must be taken fully into a...

  10. Parental nonstandard work schedules during infancy and children's BMI trajectories

    Directory of Open Access Journals (Sweden)

    Afshin Zilanawala

    2017-09-01

    Full Text Available Background: Empirical evidence has demonstrated adverse associations between parental nonstandard work schedules (i.e., evenings, nights, or weekends and child developmental outcomes. However, there are mixed findings concerning the relationship between parental nonstandard employment and children's body mass index (BMI, and few studies have incorporated information on paternal work schedules. Objective: This paper investigated BMI trajectories from early to middle childhood (ages 3-11 by parental work schedules at 9 months of age, using nationally representative cohort data from the United Kingdom. This study is the first to examine the link between nonstandard work schedules and children's BMI in the United Kingdom. Methods: We used data from the Millennium Cohort Study (2001‒2013, n = 13,021 to estimate trajectories in BMI, using data from ages 3, 5, 7, and 11 years. Joint parental work schedules and a range of biological, socioeconomic, and psychosocial covariates were assessed in the initial interviews at 9 months. Results: Compared to children in two-parent families where parents worked standard shifts, we found steeper BMI growth trajectories for children in two-parent families where both parents worked nonstandard shifts and children in single-parent families whose mothers worked a standard shift. Fathers' shift work, compared to standard shifts, was independently associated with significant increases in BMI. Conclusions: Future public health initiatives focused on reducing the risk of rapid BMI gain in childhood can potentially consider the disruptions to family processes resulting from working nonstandard hours. Contribution: Children in families in which both parents work nonstandard schedules had steeper BMI growth trajectories across the first decade of life. Fathers' nonstandard shifts were independently associated with increases in BMI.

  11. Evaluation of a twelve-hour/day shift schedule

    International Nuclear Information System (INIS)

    Lewis, P.M.; Swaim, D.J.

    1986-01-01

    In April 1985, the operating crews at the Fast Flux Test Facility near Richland, Washington, changed their rotating shift schedule from an 8-hour to a 12-hour a day work schedule. The primary purpose of the change was to reduce the attrition of operators by increasing their job satisfaction. Eighty-four percent of the operators favored the change. A program was established to evaluate the effects on plant performance, operator alertness, attrition, sleep, health, job satisfaction, and off-the-job satisfaction. Preliminary results from that evaluation program indicate that the 12-hour shift schedule is a reasonable alternative to an 8-hour schedule at this facility

  12. Reliability Generalization: An Examination of the Positive Affect and Negative Affect Schedule

    Science.gov (United States)

    Leue, Anja; Lange, Sebastian

    2011-01-01

    The assessment of positive affect (PA) and negative affect (NA) by means of the Positive Affect and Negative Affect Schedule has received a remarkable popularity in the social sciences. Using a meta-analytic tool--namely, reliability generalization (RG)--population reliability scores of both scales have been investigated on the basis of a random…

  13. Constraint-based job shop scheduling with ILOG SCHEDULER

    NARCIS (Netherlands)

    Nuijten, W.P.M.; Le Pape, C.

    1998-01-01

    We introduce constraint-based scheduling and discuss its main principles. An approximation algorithm based on tree search is developed for the job shop scheduling problem using ILOG SCHEDULER. A new way of calculating lower bounds on the makespan of the job shop scheduling problem is presented and

  14. Health Medical Examination and the Prevalence of Metabolic Syndrome

    Directory of Open Access Journals (Sweden)

    Yong Hwan Kim

    2018-06-01

    Full Text Available Metabolic syndrome (MetS is a highly prevalent condition that cannot be cured but can be controlled by health management. Health management not only includes regulation of drinking, smoking, and physical activity but also health medical examinations. However, health medical examinations at private medical facilities involve high cost, limiting continuous and regular examination. The aim of this study was to analyze the prevalence of MetS and health management behavior according to the number of health medical examinations conducted in 14 years. According to the number of health medical examinations undertaken each year from 1999 to 2012, in 2012, 21,803 visitors (14,511 men and 7,292 women from a health medical examination center at a private medical facility were assigned to low- (3–5 health examinations in 14 years, middle- (6–10 health examinations in 14 years, and high-frequency groups (11–14 health examinations during 14 years. MetS was evaluated according to the criteria of the National Cholesterol Education Program and Adult Treatment Panel III and waist circumference was measured according to the standard for Asians by the World Health Organization. Odds ratio (OR was calculated by logistic regression analysis. Blood pressure tended to decrease to 124.5 vs. 123.9 vs. 123.5 in the low-, middle-, and high-frequency groups in men, respectively. In addition, middle- and high-frequency groups demonstrated better total cholesterol, high-density lipoprotein, low-density lipoprotein, and systolic blood pressure compared with the low-frequency group. The prevalence of MetS demonstrated no significance before adjusting for variables in men, and high-frequency examinees demonstrated 18% low OR values (0.823, p<0.001 after adjusting for age. OR was 0.868 (p=0.015 when adjusted for age, other socioeconomic factors, and health behavior. In women, the prevalence of MetS demonstrated significantly high OR of 1.205 (p=0.007 and 1.300 (p=0.008 in

  15. Health and Occupational Outcomes Among Injured, Nonstandard Shift Workers.

    Science.gov (United States)

    Wong, Imelda S; Smith, Peter M; Mustard, Cameron A; Gignac, Monique A M

    2015-11-01

    This study compares health and occupational outcomes following a work-related injury for nonstandard and day-shift workers. National Population Health Survey data were used to explore outcomes 2 years post-work injury. Retrospective-matched cohort analyses examined main effects and interactions of shift schedule and work injury with changes in health, shift schedule, and labor force status. Models were adjusted for respondent characteristics, baseline health status, and occupational strength requirements. Injured nonstandard shift workers reported lower health utility index scores, compared with uninjured and injured daytime workers and uninjured nonstandard-shift workers. No significant interactions between shift and injury were found with schedule change and leaving the labor force. Injured nonstandard-shift workers are as likely to remain employed as other groups, but may be vulnerable in terms of diminished health.

  16. EoC Study Update to Examine the Cost, Schedule and Technical Changes to NASA Projects

    Science.gov (United States)

    Bitten, Bob; Emmons, Debra; Shinn, Stephen; Scolese, Chris

    2018-01-01

    The original National Aeronautics and Space Administration (NASA) Explanation of Change (EoC) study was conducted in 2010 to understand the underlying causes of cost and schedule growth. The first study consisted of 25 missions launched from 2000 to 2010 and looked at the events that led to growth. These events were categorized into different bins that were rolled up to quantify whether the growth was due to internal planning, or internal execution, or from external forces and found that the growth was evenly distributed among those three categories. The result of the study presented nine considerations focused at reducing growth due to project external events and internal planning events. Although no one 'magic bullet' consideration was discovered in the previous work, the nine considerations taken as a whole were postulated to help reduce cost and schedule change in future NASA missions. A recent update was conducted that included investigating 8 missions developed since the previous study to determine if the results were different. Cost, schedule, and mass increases were analyzed from the start of Phase B through Preliminary Design Review and Critical Design Review to Launch. As shown in this paper, the results are better with overall cost and schedule growth being reduced. The paper will show a comparison of the previous results to the updated results to show specific reductions and provide an explanation of which recommendations were followed.

  17. Influences on Cocaine Tolerance Assessed under a Multiple Conjunctive Schedule of Reinforcement

    Science.gov (United States)

    Yoon, Jin Ho; Branch, Marc N.

    2009-01-01

    Under multiple schedules of reinforcement, previous research has generally observed tolerance to the rate-decreasing effects of cocaine that has been dependent on schedule-parameter size in the context of fixed-ratio (FR) schedules, but not under the context of fixed-interval (FI) schedules of reinforcement. The current experiment examined the…

  18. Algorithm comparison for schedule optimization in MR fingerprinting.

    Science.gov (United States)

    Cohen, Ouri; Rosen, Matthew S

    2017-09-01

    In MR Fingerprinting, the flip angles and repetition times are chosen according to a pseudorandom schedule. In previous work, we have shown that maximizing the discrimination between different tissue types by optimizing the acquisition schedule allows reductions in the number of measurements required. The ideal optimization algorithm for this application remains unknown, however. In this work we examine several different optimization algorithms to determine the one best suited for optimizing MR Fingerprinting acquisition schedules. Copyright © 2017 Elsevier Inc. All rights reserved.

  19. Knowledge-based scheduling of arrival aircraft

    Science.gov (United States)

    Krzeczowski, K.; Davis, T.; Erzberger, H.; Lev-Ram, I.; Bergh, C.

    1995-01-01

    A knowledge-based method for scheduling arrival aircraft in the terminal area has been implemented and tested in real-time simulation. The scheduling system automatically sequences, assigns landing times, and assigns runways to arrival aircraft by utilizing continuous updates of aircraft radar data and controller inputs. The scheduling algorithms is driven by a knowledge base which was obtained in over two thousand hours of controller-in-the-loop real-time simulation. The knowledge base contains a series of hierarchical 'rules' and decision logic that examines both performance criteria, such as delay reduction, as well as workload reduction criteria, such as conflict avoidance. The objective of the algorithms is to devise an efficient plan to land the aircraft in a manner acceptable to the air traffic controllers. This paper will describe the scheduling algorithms, give examples of their use, and present data regarding their potential benefits to the air traffic system.

  20. Intelligent scheduling of execution for customized physical fitness and healthcare system.

    Science.gov (United States)

    Huang, Chung-Chi; Liu, Hsiao-Man; Huang, Chung-Lin

    2015-01-01

    Physical fitness and health of white collar business person is getting worse and worse in recent years. Therefore, it is necessary to develop a system which can enhance physical fitness and health for people. Although the exercise prescription can be generated after diagnosing for customized physical fitness and healthcare. It is hard to meet individual execution needs for general scheduling of physical fitness and healthcare system. So the main purpose of this research is to develop an intelligent scheduling of execution for customized physical fitness and healthcare system. The results of diagnosis and prescription for customized physical fitness and healthcare system will be generated by fuzzy logic Inference. Then the results of diagnosis and prescription for customized physical fitness and healthcare system will be scheduled and executed by intelligent computing. The scheduling of execution is generated by using genetic algorithm method. It will improve traditional scheduling of exercise prescription for physical fitness and healthcare. Finally, we will demonstrate the advantages of the intelligent scheduling of execution for customized physical fitness and healthcare system.

  1. Refinery scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Magalhaes, Marcus V.; Fraga, Eder T. [PETROBRAS, Rio de Janeiro, RJ (Brazil); Shah, Nilay [Imperial College, London (United Kingdom)

    2004-07-01

    This work addresses the refinery scheduling problem using mathematical programming techniques. The solution adopted was to decompose the entire refinery model into a crude oil scheduling and a product scheduling problem. The envelope for the crude oil scheduling problem is composed of a terminal, a pipeline and the crude area of a refinery, including the crude distillation units. The solution method adopted includes a decomposition technique based on the topology of the system. The envelope for the product scheduling comprises all tanks, process units and products found in a refinery. Once crude scheduling decisions are Also available the product scheduling is solved using a rolling horizon algorithm. All models were tested with real data from PETROBRAS' REFAP refinery, located in Canoas, Southern Brazil. (author)

  2. Sleep schedules and school performance in Indigenous Australian children.

    Science.gov (United States)

    Blunden, Sarah; Magee, Chris; Attard, Kelly; Clarkson, Larissa; Caputi, Peter; Skinner, Timothy

    2018-04-01

    Sleep duration and sleep schedule variability have been related to negative health and well-being outcomes in children, but little is known about Australian Indigenous children. Data for children aged 7-9 years came from the Australian Longitudinal Study of Indigenous Children and the National Assessment Program-Literacy and Numeracy (NAPLAN). Latent class analysis determined sleep classes taking into account sleep duration, bedtimes, waketimes, and variability in bedtimes from weekdays to weekends. Regression models tested whether the sleep classes were cross-sectionally associated with grade 3 NAPLAN scores. Latent change score modeling then examined whether the sleep classes predicted changes in NAPLAN performance from grades 3 to 5. Five sleep schedule classes were identified: normative sleep, early risers, long sleep, variable sleep, and short sleep. Overall, long sleepers performed best, with those with reduced sleep (short sleepers and early risers) performing the worse on grammar, numeracy, and writing performance. Latent change score results also showed that long sleepers performed best in spelling and writing and short sleepers and typical sleepers performed the worst over time. In this sample of Australian Indigenous children, short sleep was associated with poorer school performance compared with long sleep, with this performance worsening over time for some performance indicators. Other sleep schedules (eg, early wake times and variable sleep) also had some relationships with school performance. As sleep scheduling is modifiable, this offers opportunity for improvement in sleep and thus performance outcomes for these and potentially all children. Copyright © 2018 National Sleep Foundation. Published by Elsevier Inc. All rights reserved.

  3. Re-scheduling nursing shifts: Scoping the challenge and examining the potential of mathematical model based tools

    OpenAIRE

    Clark, A.; Moule, P.; Topping, A.; Serpell, M.

    2015-01-01

    Aims: To review research in the literature on nursing shift scheduling/rescheduling, and report key issues identified in a listening exercise with managers in four English NHS trusts to inform the development of mathematical tools for rescheduling decision-making.\\ud Background: Shift rescheduling is unrecognised as an everyday time-consuming management task with different imperatives than scheduling. Poor rescheduling decisions can have quality, cost and morale implications.\\ud Evaluation: A...

  4. Variable demand and productivity in diagnostic medicine: the customer experience with the scheduling of examinations

    Directory of Open Access Journals (Sweden)

    Leandro Ortigoza Martins

    2016-04-01

    Full Text Available From the perspective of marketing, diagnostic medicine services are perishable and demand is variable — characteristics that difficult the maximization of results. Service providers offer the exams through time scheduling system without, however, overcome the inefficiency caused by the no show customers. The objective of this research was to investigate the level of satisfaction of consumers of diagnostic medicine with the schedule, the acceptance of a new model without an appointment time and analyze three secondary dimensions common to the two models (no show, seasonality and timeout in customer satisfaction. This is a quantitative research with exploratory-descriptive design performed with 2,545 clients from a privately held diagnostic medicine in 2013. The results of the secondary dimensions indicated that customers tend to frequent establishments as the current seasonal and are sensitive to wait. As for the main dimensions (scheduling and demand free, there are different levels of acceptance, indicating that the two systems are complementary and not exclusive and therefore, the feasibility of adopting a hybrid model of operation, with the use of two templates.

  5. A compressed shift schedule: dealing with some of the problems of shift work

    Energy Technology Data Exchange (ETDEWEB)

    Cunningham, J B [Victoria University, Victoria, BC (Canada). School of Public Administration

    1989-07-01

    This study examines some of the psychological and behavioural effects of a 12-hour compressed shift schedule on coal miners in two organisations in Western Canada. It suggests that young, married compressed shift workers are more satisfied with their family relationship. They spend less of their leisure time with spouses when working shifts, and do not spend any more time with them on their days off. They have less time available for many leisure activities on their workdays. The extra time on days off is not reallocated to the leisure activities they were unable to do on their workdays. Some extra leisure time on days off may be spent on personal hobbies. There is no suggestion that the compressed shift schedule has any negative effect on the individual's health. 38 refs., 3 tabs.

  6. Alternative Work Schedules Increase Employee Satisfaction.

    Science.gov (United States)

    Turney, John R.; Cohen, Stanley L.

    1983-01-01

    Facets of alternative work schedules (AWS) are discussed: importance of employee control, possible negative consequences, AWS handbook, time monitoring systems, and treatment of exceptions. AWS' effect on productivity and motivation is examined. (SK)

  7. Health and turnover of working mothers after childbirth via the work-family interface: an analysis across time.

    Science.gov (United States)

    Carlson, Dawn S; Grzywacz, Joseph G; Ferguson, Merideth; Hunter, Emily M; Clinch, C Randall; Arcury, Thomas A

    2011-09-01

    This study examined organizational levers that impact work-family experiences, participant health, and subsequent turnover. Using a sample of 179 women returning to full-time work 4 months after childbirth, we examined the associations of 3 job resources (job security, skill discretion, and schedule control) with work-to-family enrichment and the associations of 2 job demands (psychological requirements and nonstandard work schedules) with work-to-family conflict. Further, we considered subsequent impact of work-to-family conflict and enrichment on women's health (physical and mental health) 8 months after women returned to work and the impact of health on voluntary turnover 12 months after women returned to work. Having a nonstandard work schedule was directly and positively related to conflict, whereas schedule control buffered the effect of psychological requirements on conflict. Skill discretion and job security, both job resources, directly and positively related to enrichment. Work-to-family conflict was negatively related to both physical and mental health, but work-to-family enrichment positively predicted only physical health. Physical health and mental health both negatively influenced turnover. We discuss implications and opportunities for future research. PsycINFO Database Record (c) 2011 APA, all rights reserved

  8. Health and Turnover of Working Mothers After Childbirth Via the Work–Family Interface: An Analysis Across Time

    Science.gov (United States)

    Carlson, Dawn S.; Grzywacz, Joseph G.; Ferguson, Merideth; Hunter, Emily M.; Clinch, C. Randall; Arcury, Thomas A.

    2013-01-01

    This study examined organizational levers that impact work–family experiences, participant health, and subsequent turnover. Using a sample of 179 women returning to full-time work 4 months after childbirth, we examined the associations of 3 job resources (job security, skill discretion, and schedule control) with work-to-family enrichment and the associations of 2 job demands (psychological requirements and nonstandard work schedules) with work-to-family conflict. Further, we considered subsequent impact of work-to-family conflict and enrichment on women’s health (physical and mental health) 8 months after women returned to work and the impact of health on voluntary turnover 12 months after women returned to work. Having a nonstandard work schedule was directly and positively related to conflict, whereas schedule control buffered the effect of psychological requirements on conflict. Skill discretion and job security, both job resources, directly and positively related to enrichment. Work-to-family conflict was negatively related to both physical and mental health, but work-to-family enrichment positively predicted only physical health. Physical health and mental health both negatively influenced turnover. We discuss implications and opportunities for future research. PMID:21604833

  9. Undressing "health fashion": an examination of health-cause clothing and accessories.

    Science.gov (United States)

    Walker, Kandi L; Hart, Joy L; Gregg, Jennifer L; LaJoie, A Scott

    2010-09-01

    Today, fashion items such as rubber wristbands in various colors, pink ribbons, and red dresses represent different health-related causes and can be seen frequently across demographic groups. Complete with pithy slogans (e.g., "Go Red for Women"), these items are part of a larger "health fashion" trend--one that involves wearing, using, and displaying health-cause clothing and accessories. In this article, the authors explore recent interest in "health fashion," examining in particular its origins, effectiveness, and implications.

  10. Psychometric properties of the World Health Organization Disability Assessment Schedule used in the European Study of the Epidemiology of Mental Disorders

    NARCIS (Netherlands)

    Buist-Bouwman, M. A.; Ormel, J.; De Graaf, R.; Vilagut, G.; Alonso, J.; Van Sonderen, E.; Vollebergh, W. A. M.

    2008-01-01

    This study assessed the factor structure, internal consistency, and discriminatory validity of the World Health Organization Disability Assessment Schedule (WHODAS) version used in the European Study of the Epidemiology of Mental Disorders (ESEMeD). In total 8796 adults were assessed using the

  11. A Mechanized Decision Support System for Academic Scheduling.

    Science.gov (United States)

    1986-03-01

    an operational system called software. The first step in the development phase is Design . Designers destribute software control by factoring the Data...SUBJECT TERMS (Continue on reverse if necessary and identify by block number) ELD GROUP SUB-GROUP Scheduling, Decision Support System , Software Design ...scheduling system . It will also examine software - design techniques to identify the most appropriate method- ology for this problem. " - Chapter 3 will

  12. Couples’ work schedules and child-care use in the Netherlands

    NARCIS (Netherlands)

    Verhoef, Melissa; Roeters, Anne; van der Lippe, Tanja

    2016-01-01

    Various aspects of parental work schedules affect the opportunities and constraints that parents encounter when arranging care for their children. This study examined the extent to which the combination of couples’ work schedules was associated with their use of different types of child care,

  13. Block Scheduling: Restructuring the School Day. Hot Topics Series.

    Science.gov (United States)

    Flinders, David J., Ed.

    The advantages and disadvantages of block scheduling are considered in 24 articles. The editors provide an overview for each section and a conclusion for the anthology. The first section includes articles which examine issues, concepts, and cases: (1) "All around the Block" (Michael D. Rettig and Robert Lynn Canady); (2) "Block Scheduling: A Means…

  14. 5 CFR 630.1204 - Intermittent leave or reduced leave schedule.

    Science.gov (United States)

    2010-01-01

    ... insurance, health benefits, retirement coverage, and leave accrual). (e) The agency shall determine the... REGULATIONS ABSENCE AND LEAVE Family and Medical Leave § 630.1204 Intermittent leave or reduced leave schedule... reduced leave schedule unless the employee and the agency agree to do so. (b) Leave under § 630.1203(a) (3...

  15. Zagreb regimen, an abbreviated intramuscular schedule for rabies vaccination.

    Science.gov (United States)

    Ren, Jiangping; Yao, Linong; Sun, Jimin; Gong, Zhenyu

    2015-01-01

    The Zagreb regimen, an abbreviated intramuscular schedule for rabies vaccination, was developed by I. Vodopija and colleagues of the Zagreb Institute of Public Health in Croatia in the 1980s. It was recommended by WHO as one of the intramuscular (IM) schedules for rabies vaccination in 2010. We reviewed the literature on the immunogenicity, safety, economic burden, and compliance of the Zagreb 2-1-1 regimen. Compared to Essen, another IM schedule recommended by WHO, Zagreb has higher compliance, lower medical cost, and better immunogenicity at an early stage. Copyright © 2015, American Society for Microbiology. All Rights Reserved.

  16. 77 FR 23250 - HIT Standards Committee; Schedule for the Assessment of HIT Policy Committee Recommendations

    Science.gov (United States)

    2012-04-18

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES HIT Standards Committee; Schedule for the Assessment of HIT Policy Committee Recommendations AGENCY: Office of the National Coordinator for Health Information... 2009 mandates that the HIT Standards Committee develop a schedule for the assessment of policy...

  17. 76 FR 25355 - HIT Standards Committee; Schedule for the Assessment of HIT Policy Committee Recommendations

    Science.gov (United States)

    2011-05-04

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES HIT Standards Committee; Schedule for the Assessment of HIT Policy Committee Recommendations AGENCY: Office of the National Coordinator for Health Information... 2009 mandates that the HIT Standards Committee develop a schedule for the assessment of policy...

  18. 78 FR 29134 - HIT Standards Committee; Schedule for the Assessment of HIT Policy Committee Recommendations

    Science.gov (United States)

    2013-05-17

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES HIT Standards Committee; Schedule for the Assessment of HIT Policy Committee Recommendations AGENCY: Office of the National Coordinator for Health Information... 2009 mandates that the HIT Standards Committee develop a schedule for the assessment of policy...

  19. Schedules of Controlled Substances: Temporary Placement of 4-Fluoroisobutyryl Fentanyl into Schedule I. Temporary scheduling order.

    Science.gov (United States)

    2017-05-03

    The Administrator of the Drug Enforcement Administration is issuing this temporary scheduling order to schedule the synthetic opioid, N-(4-fluorophenyl)-N-(1-phenethylpiperidin-4-yl)isobutyramide (4-fluoroisobutyryl fentanyl or para-fluoroisobutyryl fentanyl), and its isomers, esters, ethers, salts and salts of isomers, esters, and ethers, into schedule I pursuant to the temporary scheduling provisions of the Controlled Substances Act. This action is based on a finding by the Administrator that the placement of 4-fluoroisobutyryl fentanyl into schedule I of the Controlled Substances Act is necessary to avoid an imminent hazard to the public safety. As a result of this order, the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule I controlled substances will be imposed on persons who handle (manufacture, distribute, reverse distribute, import, export, engage in research, conduct instructional activities or chemical analysis, or possess), or propose to handle, 4-fluoroisobutyryl fentanyl.

  20. Physician Fee Schedule National Payment Amount File

    Data.gov (United States)

    U.S. Department of Health & Human Services — The significant size of the Physician Fee Schedule Payment Amount File-National requires that database programs (e.g., Access, dBase, FoxPro, etc.) be used to read...

  1. Differences in Student Outcomes between Block, Semester, and Trimester Schedules.

    Science.gov (United States)

    McCreary, Jason; Hausman, Charles

    Despite the popularity of schedule modifications as a cost-effective reform to improve student outcomes, little empirical research on the consequences of alternative schedules has been conducted. The literature has been dominated by anecdotal reports. Even when empirical evidence is examined, causal comparisons of school outcomes between schedules…

  2. Scheduling techniques in the Request Oriented Scheduling Engine (ROSE)

    Science.gov (United States)

    Zoch, David R.

    1991-01-01

    Scheduling techniques in the ROSE are presented in the form of the viewgraphs. The following subject areas are covered: agenda; ROSE summary and history; NCC-ROSE task goals; accomplishments; ROSE timeline manager; scheduling concerns; current and ROSE approaches; initial scheduling; BFSSE overview and example; and summary.

  3. Does self-scheduling increase nurses' job satisfaction? An integrative literature review.

    Science.gov (United States)

    Koning, Clare

    2014-09-25

    Flexible work schedules give nurses the freedom and control to manage the demands of work and home, allow organisations to meet their staffing needs and can improve job satisfaction. This article reports the results of an integrative review of published peer-reviewed research and personal narratives that examined nurses' perceptions of the relationship between job satisfaction and a self-scheduling system. Results suggest that self-scheduling is one of a number of factors that influence job satisfaction, but that implementing and sustaining such a system can be challenging. The review also found that self-scheduling programmes underpin more flexible work schedules and can benefit nurses and their organisations.

  4. 29 CFR 1952.221 - Developmental schedule.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Developmental schedule. 1952.221 Section 1952.221 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR... Management data system operational July 1, 1973. Automated Management data system operational January 1, 1974...

  5. 29 CFR 1952.341 - Developmental schedule.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Developmental schedule. 1952.341 Section 1952.341 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR... State Legislature January 1975 and to become effective by May 1, 1975. (d) Management Information System...

  6. National Health and Nutrition Examination Survey (NHANES), 2009-2010

    Data.gov (United States)

    U.S. Department of Health & Human Services — The National Health and Nutrition Examination Survey (NHANES) is a program of studies designed to assess the health and nutritional status of adults and children in...

  7. The value of physical examination in mental health nursing.

    Science.gov (United States)

    Martin, Carolyn T

    2016-03-01

    This article explores the use of a physical examination assignment in a mental health general nursing clinical placement course that addresses the poor physical health of people with mental illness and the barriers traditionally impeding health care provision for this population. A descriptive qualitative approach utilizes inductive content analysis to investigate 145 student survey responses. The assignment assists student nurses in understanding that physical and mental well-being are intrinsically linked. Students report increased comfort performing a physical examination on patients with mental illness post assignment. Students' initial bias towards this population was minimized post the clinical assignment. Poor physical health is common among people with mental health problems. Many view the provision of care as a major public health issue. Nurses are the front line caregivers of mental health service consumers and are well positioned to assess their physical needs. Their assessment may be the first step in recognizing health care issues in this population. Copyright © 2015 Elsevier Ltd. All rights reserved.

  8. Scheduling models in farm management : a new approach

    NARCIS (Netherlands)

    Wijngaard, P.J.M.

    1988-01-01

    Three operational planning models to calculate schedules for an arable farm are examined. These models are a linear programming model, a dynamic programming model and a simulation model. They are examined at different levels of aggregation and relaxation in a retrospective way. Also a

  9. 2007 Wholesale Power Rate Schedules : 2007 General Rate Schedule Provisions.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    2006-11-01

    This schedule is available for the contract purchase of Firm Power to be used within the Pacific Northwest (PNW). Priority Firm (PF) Power may be purchased by public bodies, cooperatives, and Federal agencies for resale to ultimate consumers, for direct consumption, and for Construction, Test and Start-Up, and Station Service. Rates in this schedule are in effect beginning October 1, 2006, and apply to purchases under requirements Firm Power sales contracts for a three-year period. The Slice Product is only available for public bodies and cooperatives who have signed Slice contracts for the FY 2002-2011 period. Utilities participating in the Residential Exchange Program (REP) under Section 5(c) of the Northwest Power Act may purchase Priority Firm Power pursuant to the Residential Exchange Program. Rates under contracts that contain charges that escalate based on BPA's Priority Firm Power rates shall be based on the three-year rates listed in this rate schedule in addition to applicable transmission charges. This rate schedule supersedes the PF-02 rate schedule, which went into effect October 1, 2001. Sales under the PF-07 rate schedule are subject to BPA's 2007 General Rate Schedule Provisions (2007 GRSPs). Products available under this rate schedule are defined in the 2007 GRSPs. For sales under this rate schedule, bills shall be rendered and payments due pursuant to BPA's 2007 GRSPs and billing process.

  10. Project management with dynamic scheduling baseline scheduling, risk analysis and project control

    CERN Document Server

    Vanhoucke, Mario

    2013-01-01

    The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in the project life cycle.

  11. NASA scheduling technologies

    Science.gov (United States)

    Adair, Jerry R.

    1994-01-01

    This paper is a consolidated report on ten major planning and scheduling systems that have been developed by the National Aeronautics and Space Administration (NASA). A description of each system, its components, and how it could be potentially used in private industry is provided in this paper. The planning and scheduling technology represented by the systems ranges from activity based scheduling employing artificial intelligence (AI) techniques to constraint based, iterative repair scheduling. The space related application domains in which the systems have been deployed vary from Space Shuttle monitoring during launch countdown to long term Hubble Space Telescope (HST) scheduling. This paper also describes any correlation that may exist between the work done on different planning and scheduling systems. Finally, this paper documents the lessons learned from the work and research performed in planning and scheduling technology and describes the areas where future work will be conducted.

  12. 75 FR 42831 - Proposed Collection; Comment Request for Form 1065, Schedule C, Schedule D, Schedule K-1...

    Science.gov (United States)

    2010-07-22

    .../or continuing information collections, as required by the Paperwork Reduction Act of 1995, Public Law... Income, Credits, Deductions and Other Items), Schedule L (Balance Sheets per Books), Schedule M-1 (Reconciliation of Income (Loss) per Books With Income (Loss) per Return)), Schedule M-2 (Analysis of Partners...

  13. Scheduling reinforcement about once a day.

    Science.gov (United States)

    Eckerman, D A

    1999-04-01

    A pigeon earned its daily food by pecking a key according to reinforcement schedules that produced food about once per day. Fixed-interval (FI), Fixed-time (FT), and various complex schedules were arranged to demonstrate the degree to which a scalloped pattern of responding remained. Pausing continued until about an hour before the reinforcer could be earned for FIs of 12, 24, and 48 h. Pausing was not as long for FIs of 18, 19, and 23 h. Pausing of about 24 h was seen for FI 36 h. FT 24 h produced continued responding but at a diminished frequency. The pattern of responding was strongly controlled by the schedule of reinforcement and seemed relatively independent of the cycle of human activity in the surrounding laboratory. Effects of added ratio contingencies and of signaling the availability of reinforcement in FT were also examined. Signaled FTs of 5 min-3 h produced more responding during the signal (autoshaping) than did FTs of 19 or 24 h.

  14. Discordance between 'actual' and 'scheduled' check-in times at a heart failure clinic.

    Science.gov (United States)

    Gorodeski, Eiran Z; Joyce, Emer; Gandesbery, Benjamin T; Blackstone, Eugene H; Taylor, David O; Tang, W H Wilson; Starling, Randall C; Hachamovitch, Rory

    2017-01-01

    A 2015 Institute Of Medicine statement "Transforming Health Care Scheduling and Access: Getting to Now", has increased concerns regarding patient wait times. Although waiting times have been widely studied, little attention has been paid to the role of patient arrival times as a component of this phenomenon. To this end, we investigated patterns of patient arrival at scheduled ambulatory heart failure (HF) clinic appointments and studied its predictors. We hypothesized that patients are more likely to arrive later than scheduled, with progressively later arrivals later in the day. Using a business intelligence database we identified 6,194 unique patients that visited the Cleveland Clinic Main Campus HF clinic between January, 2015 and January, 2017. This clinic served both as a tertiary referral center and a community HF clinic. Transplant and left ventricular assist device (LVAD) visits were excluded. Punctuality was defined as the difference between 'actual' and 'scheduled' check-in times, whereby negative values (i.e., early punctuality) were patients who checked-in early. Contrary to our hypothesis, we found that patients checked-in late only a minority of the time (38% of visits). Additionally, examining punctuality by appointment hour slot we found that patients scheduled after 8AM had progressively earlier check-in times as the day progressed (P < .001 for trend). In both a Random Forest-Regression framework and linear regression models the most important risk-adjusted predictors of early punctuality were: later in the day appointment hour slot, patient having previously been to the hospital, age in the early 70s, and white race. Patients attending a mixed population ambulatory HF clinic check-in earlier than scheduled times, with progressive discrepant intervals throughout the day. This finding may have significant implications for provider utilization and resource planning in order to maximize clinic efficiency. The impact of elective early arrival on

  15. Psychometric Validation of the World Health Organization Disability Assessment Schedule 2.0-Twelve-Item Version in Persons with Spinal Cord Injuries

    Science.gov (United States)

    Smedema, Susan Miller; Ruiz, Derek; Mohr, Michael J.

    2017-01-01

    Purpose: To evaluate the factorial and concurrent validity and internal consistency reliability of the World Health Organization Disability Assessment Schedule 2.0 (WHODAS 2.0) 12-item version in persons with spinal cord injuries. Method: Two hundred forty-seven adults with spinal cord injuries completed an online survey consisting of the WHODAS…

  16. Schedule and status of irradiation experiments

    International Nuclear Information System (INIS)

    Rowcliffe, A.F.; Grossbeck, M.L.; Robertson, J.P.

    1998-01-01

    The current status of reactor irradiation experiments is presented in tables summarizing the experimental objectives, conditions, and schedule. Currently, the program has four irradiation experiments in reactor, and five experiments in the design or construction stages. Postirradiation examination and testing is in progress on ten experiments

  17. Accelerating exact schedulability analysis for fixed-priority pre-emptive scheduling

    NARCIS (Netherlands)

    Hang, Y.; Jiale, Z.; Keskin, U.; Bril, R.J.

    2010-01-01

    The schedulability analysis for fixed-priority preemptive scheduling (FPPS) plays a significant role in the real-time systems domain. The so-called Hyperplanes Exact Test (HET) [1] is an example of an exact schedulability test for FPPS. In this paper, we aim at improving the efficiency of HET by

  18. Maternal Nonstandard Work Schedules and Breastfeeding Behaviors.

    Science.gov (United States)

    Zilanawala, Afshin

    2017-06-01

    Objectives Although maternal employment rates have increased in the last decade in the UK, there is very little research investigating the linkages between maternal nonstandard work schedules (i.e., work schedules outside of the Monday through Friday, 9-5 schedule) and breastfeeding initiation and duration, especially given the wide literature citing the health advantages of breastfeeding for mothers and children. Methods This paper uses a population-based, UK cohort study, the Millennium Cohort Study (n = 17,397), to investigate the association between types of maternal nonstandard work (evening, night, away from home overnight, and weekends) and breastfeeding behaviors. Results In unadjusted models, exposure to evening shifts was associated with greater odds of breastfeeding initiation (OR 1.71, CI 1.50-1.94) and greater odds of short (OR 1.55, CI 1.32-1.81), intermediate (OR 2.01, CI 1.64-2.47), prolonged partial duration (OR 2.20, CI 1.78-2.72), and prolonged exclusive duration (OR 1.53, CI 1.29-1.82), compared with mothers who were unemployed and those who work other types of nonstandard shifts. Socioeconomic advantage of mothers working evening schedules largely explained the higher odds of breastfeeding initiation and duration. Conclusions Socioeconomic characteristics explain more breastfeeding behaviors among mothers working evening shifts. Policy interventions to increase breastfeeding initiation and duration should consider the timing of maternal work schedules.

  19. Therapeutic Value of the Periodic Health Examination

    Energy Technology Data Exchange (ETDEWEB)

    Lincoln, T. A.; Hurt, H. B.

    1965-09-01

    The Oak Ridge National Laboratory has been conducting periodic health examinations on all of its employees for over 10 years. The original purpose of this program was the early detection of disease to be followed by referral or appropriate counseling. Because of the relatively young age of this group, we expected that this service would be of greatest benefit to only the small percentage who had significant findings. However, over this 10 year period we have been increasingly impressed that those who had no significant findings have expressed almost as much enthusiasm and gratitude as those in whom we found early but potentially serious disease. This response caused us to look more critically at the reasons for this favorable reaction. As a result, we have become convinced that these examinations have an important therapeutic value to the healthy, as well as the sick, and that this fact should be considered in their justification. A health examination can quite properly be considered therapeutic, even though no disease is found or treated, providing it "serves" or meets some of the needs of the person being examined. After all, the literal definition of the word therapeutic is service, since it is derived from the Greek word therapeutikos, which means an attendant or servant.

  20. Job shop scheduling with makespan objective: A heuristic approach

    Directory of Open Access Journals (Sweden)

    Mohsen Ziaee

    2014-04-01

    Full Text Available Job shop has been considered as one of the most challenging scheduling problems and there are literally tremendous efforts on reducing the complexity of solution procedure for solving job shop problem. This paper presents a heuristic method to minimize makespan for different jobs in a job shop scheduling. The proposed model is based on a constructive procedure to obtain good quality schedules, very quickly. The performance of the proposed model of this paper is examined on standard benchmarks from the literature in order to evaluate its performance. Computational results show that, despite its simplicity, the proposed heuristic is computationally efficient and practical approach for the problem.

  1. A distributed scheduling algorithm for heterogeneous real-time systems

    Science.gov (United States)

    Zeineldine, Osman; El-Toweissy, Mohamed; Mukkamala, Ravi

    1991-01-01

    Much of the previous work on load balancing and scheduling in distributed environments was concerned with homogeneous systems and homogeneous loads. Several of the results indicated that random policies are as effective as other more complex load allocation policies. The effects of heterogeneity on scheduling algorithms for hard real time systems is examined. A distributed scheduler specifically to handle heterogeneities in both nodes and node traffic is proposed. The performance of the algorithm is measured in terms of the percentage of jobs discarded. While a random task allocation is very sensitive to heterogeneities, the algorithm is shown to be robust to such non-uniformities in system components and load.

  2. Teacher stress and health; examination of a model.

    Science.gov (United States)

    DeFrank, R S; Stroup, C A

    1989-01-01

    Stress in teaching derives from a variety of sources, and evidence exists linking such stress to physical and mental health concerns. Detailed examination of the linkages among personal factors, job stress, job satisfaction and symptomatology have not been done in this occupation, however, and the present study examines a model interrelating these variables. A survey of 245 predominantly female elementary school teachers in southeast Texas suggested that demographic factors and teaching background do not influence stress, satisfaction or health concerns. However, while job stress was the strongest predictor of job satisfaction, this stress had no direct relationship with health problems, an unexpected finding. Write-in responses by teachers indicated additional sources of stress, many of which were environmental or policy-based in nature. The implications of these findings for future research and stress management interventions for teachers are discussed.

  3. Implications of Nontraditional Work Schedules for Women

    Science.gov (United States)

    Polit, Denise F.

    1978-01-01

    Issues, evidence, and arguments relating to the effects of alternative working arrangements on the lives of women are examined. Forms of nontraditional schedules which are analyzed include the shortened work week, flexible working hours, and part-time employment. (Author/GC)

  4. The Danish preventive child health examination should expand on mental health and the well-being of the family

    DEFF Research Database (Denmark)

    Nielsen, Kirsten Lykke; Graungaard, Anette Hauskov; Ertmann, Ruth

    2015-01-01

    . CONCLUSION: The preventive child health examination is animportant platform for examination and dialogue concerninga child’s health. The physical aspect works well, butthere is a need for development of the assessment of thechild’s mental health and the well-being of the family. FUNDING: Postdoctoral......INTRODUCTION: In Denmark, around one in six children hassignificant somatic, psychological or social health problems,often in combination. The preventive child health examinationshave a high participation rate; and they produce significantfindings, predominantly concerning the child...... of ninedoctors from seven clinics participated. We included 21 casesin our study, each consisting of a consultation and subsequentinterviews with the child’s parents and with thedoctor. RESULTS: The examination of the child’s physical health anddevelopment is an important feature of the health examination...

  5. Web Publishing Schedule

    Science.gov (United States)

    Section 207(f)(2) of the E-Gov Act requires federal agencies to develop an inventory and establish a schedule of information to be published on their Web sites, make those schedules available for public comment. To post the schedules on the web site.

  6. Family characteristics and parents' and children's health behaviour are associated with public health nurses' concerns at children's health examinations.

    Science.gov (United States)

    Poutiainen, Hannele; Hakulinen, Tuovi; Mäki, Päivi; Laatikainen, Tiina

    2016-12-01

    The study aimed to establish whether family characteristics and the health behaviour and illnesses of parents and children are associated with public health nurses' (PHNs') concerns about children's physical health and psychosocial development in the context of health examinations. Factors affecting children's health and well-being should be identified as early as possible to provide children and families appropriate support. In 2007-2009, a cross-sectional study in Finland collected information about PHNs' concerns, children's health and well-being as well as the background factors affecting them during health examinations of preschool-age children and school-aged children (n = 4795). Associations between family characteristics, parents' and children's behaviour and diseases, and PHNs' concerns were assessed using logistic regression analysis. Overweight in children, the long-term illnesses of both children and parents, and parental smoking were the factors most strongly associated with PHNs' concerns about a child's physical health whereas non-nuclear family types, the father's low educational level and unemployment, the child's lack of sleep, and bullying were associated with concerns about the child's psychosocial development. The connections found demonstrate that health examinations should address factors that affect the whole family's well-being so as to comprehensively promote children's health, growth and development. © 2016 John Wiley & Sons Australia, Ltd.

  7. The applicability of knowledge-based scheduling to the utilities industry

    International Nuclear Information System (INIS)

    Yoshimoto, G.; Gargan, R. Jr.; Duggan, P.

    1992-01-01

    The Electric Power Research Institute (EPRI), Nuclear Power Division, has identified the three major goals of high technology applications for nuclear power plants. These goals are to enhance power production through increasing power generation efficiency, to increase productivity of the operations, and to reduce the threats to the safety of the plant. Our project responds to the second goal by demonstrating that significant productivity increases can be achieved for outage maintenance operations based on existing knowledge-based scheduling technology. Its use can also mitigate threats to potential safety problems by means of the integration of risk assessment features into the scheduler. The scheduling approach uses advanced techniques enabling the automation of the routine scheduling decision process that previously was handled by people. The process of removing conflicts in scheduling is automated. This is achieved by providing activity representations that allow schedulers to express a variety of different scheduling constraints and by implementing scheduling mechanisms that simulate kinds of processes that humans use to find better solutions from a large number of possible solutions. This approach allows schedulers to express detailed constraints between activities and other activities, resources (material and personnel), and requirements that certain states exist for their execution. Our scheduler has already demonstrated its benefit to improving the shuttle processing flow management at Kennedy Space Center. Knowledge-based scheduling techniques should be examined by utilities industry researchers, developers, operators and management for application to utilities planning problems because of its great cost benefit potential. 4 refs., 4 figs

  8. Examining national trends in worker health with the National Health Interview Survey.

    Science.gov (United States)

    Luckhaupt, Sara E; Sestito, John P

    2013-12-01

    To describe data from the National Health Interview Survey (NHIS), both the annual core survey and periodic occupational health supplements (OHSs), available for examining national trends in worker health. The NHIS is an annual in-person household survey with a cross-sectional multistage clustered sample design to produce nationally representative health data. The 2010 NHIS included an OHS. Prevalence rates of various health conditions and health behaviors among workers based on multiple years of NHIS core data are available. In addition, the 2010 NHIS-OHS data provide prevalence rates of selected health conditions, work organization factors, and occupational exposures among US workers by industry and occupation. The publicly available NHIS data can be used to identify areas of concern for various industries and for benchmarking data from specific worker groups against national averages.

  9. An introduction to optimal satellite range scheduling

    CERN Document Server

    Vázquez Álvarez, Antonio José

    2015-01-01

    The satellite range scheduling (SRS) problem, an important operations research problem in the aerospace industry consisting of allocating tasks among satellites and Earth-bound objects, is examined in this book. SRS principles and solutions are applicable to many areas, including: Satellite communications, where tasks are communication intervals between sets of satellites and ground stations Earth observation, where tasks are observations of spots on the Earth by satellites Sensor scheduling, where tasks are observations of satellites by sensors on the Earth. This self-contained monograph begins with a structured compendium of the problem and moves on to explain the optimal approach to the solution, which includes aspects from graph theory, set theory, game theory and belief networks. This book is accessible to students, professionals and researchers in a variety of fields, including: operations research, optimization, scheduling theory, dynamic programming and game theory. Taking account of the distributed, ...

  10. Integrated network design and scheduling problems :

    Energy Technology Data Exchange (ETDEWEB)

    Nurre, Sarah G.; Carlson, Jeffrey J.

    2014-01-01

    We consider the class of integrated network design and scheduling problems. These problems focus on selecting and scheduling operations that will change the characteristics of a network, while being speci cally concerned with the performance of the network over time. Motivating applications of INDS problems include infrastructure restoration after extreme events and building humanitarian distribution supply chains. While similar models have been proposed, no one has performed an extensive review of INDS problems from their complexity, network and scheduling characteristics, information, and solution methods. We examine INDS problems under a parallel identical machine scheduling environment where the performance of the network is evaluated by solving classic network optimization problems. We classify that all considered INDS problems as NP-Hard and propose a novel heuristic dispatching rule algorithm that selects and schedules sets of arcs based on their interactions in the network. We present computational analysis based on realistic data sets representing the infrastructures of coastal New Hanover County, North Carolina, lower Manhattan, New York, and a realistic arti cial community CLARC County. These tests demonstrate the importance of a dispatching rule to arrive at near-optimal solutions during real-time decision making activities. We extend INDS problems to incorporate release dates which represent the earliest an operation can be performed and exible release dates through the introduction of specialized machine(s) that can perform work to move the release date earlier in time. An online optimization setting is explored where the release date of a component is not known.

  11. The Danish Health Examination Survey 2007-2008 (DANHES 2007-2008)

    DEFF Research Database (Denmark)

    Eriksen, Louise; Grønbæk, Morten; Helge, Jørn Wulff

    2011-01-01

    AIMS: The Danish Health Examination Survey (DANHES 2007-2008) was carried out by the National Institute of Public Health, University of Southern Denmark, in 13 Danish municipalities in 2007-2008. The focus of the survey was diet, smoking, alcohol, and physical activity. The aim of the survey......, and living conditions, and a supplementary food frequency questionnaire. The health examination contained measurements of blood pressure, resting heart rate, height, weight, fat percentage, waist and hip circumference, blood and hair samples, spirometry, bone mineral density, physical performance, muscle...

  12. Examining the association between oral health and oral HPV infection.

    Science.gov (United States)

    Bui, Thanh Cong; Markham, Christine M; Ross, Michael Wallis; Mullen, Patricia Dolan

    2013-09-01

    Oral human papillomavirus (HPV) infection is the cause of 40% to 80% of oropharyngeal cancers; yet, no published study has examined the role of oral health in oral HPV infection, either independently or in conjunction with other risk factors. This study examined the relation between oral health and oral HPV infection and the interactive effects of oral health, smoking, and oral sex on oral HPV infection. Our analyses comprised 3,439 participants ages 30 to 69 years for whom data on oral HPV and oral health were available from the nationally representative 2009-2010 National Health and Nutrition Examination Survey. Results showed that higher unadjusted prevalence of oral HPV infection was associated with four measures of oral health, including self-rated oral health as poor-to-fair [prevalence ratio (PR) = 1.56; 95% confidence interval (CI), 1.25-1.95], indicated the possibility of gum disease (PR = 1.51; 95% CI, 1.13-2.01), reported use of mouthwash to treat dental problems in the past week (PR = 1.28; 95% CI, 1.07-1.52), and higher number of teeth lost (Ptrend = 0.035). In multivariable logistic regression models, oral HPV infection had a statistically significant association with self-rated overall oral health (OR = 1.55; 95% CI, 1.15-2.09), independent of smoking and oral sex. In conclusion, poor oral health was an independent risk factor of oral HPV infection, irrespective of smoking and oral sex practices. Public health interventions may aim to promote oral hygiene and oral health as an additional measure to prevent HPV-related oral cancers.

  13. Adaptive scheduling with postexamining user selection under nonidentical fading

    KAUST Repository

    Gaaloul, Fakhreddine

    2012-11-01

    This paper investigates an adaptive scheduling algorithm for multiuser environments with statistically independent but nonidentically distributed (i.n.d.) channel conditions. The algorithm aims to reduce feedback load by sequentially and arbitrarily examining the user channels. It also provides improved performance by realizing postexamining best user selection. The first part of the paper presents new formulations for the statistics of the signal-to-noise ratio (SNR) of the scheduled user under i.n.d. channel conditions. The second part capitalizes on the findings in the first part and presents various performance and processing complexity measures for adaptive discrete-time transmission. The results are then extended to investigate the effect of outdated channel estimates on the statistics of the scheduled user SNR, as well as some performance measures. Numerical results are provided to clarify the usefulness of the scheduling algorithm under perfect or outdated channel estimates. © 1967-2012 IEEE.

  14. Game Schedules and Rate of Concussions in the National Football League.

    Science.gov (United States)

    Teramoto, Masaru; Cushman, Daniel M; Cross, Chad L; Curtiss, Heather M; Willick, Stuart E

    2017-11-01

    Concussion prevention in the National Football League (NFL) is an important priority for player safety. The NFL now has modified game schedules, and one concern is that unconventional game schedules, such as a shortened rest period due to playing on a Thursday rather than during the weekend, may lead to an increased risk of injuries. Unconventional game schedules in the NFL are associated with an increased rate of concussion. Descriptive epidemiological study. This study analyzed concussions and game schedules over the NFL regular seasons from 2012 to 2015 (4 years). Documented numbers of concussions, identified by use of the online database PBS Frontline Concussion Watch, were summarized by regular-season weeks. Association of days of rest and game location (home, away, or overseas) with the rate of concussion was examined by use of the χ 2 test. Logistic regression analysis was performed to examine the relationships of days of rest and home/away games to the risk of repeated concussions, with adjustment for player position. A total of 582 concussions were analyzed in this study. A significantly greater number of concussions occurred in the second half of the season ( P game location, or timing of the bye week by the team or the opponent ( P > .05). Game schedules were not significantly associated with the occurrence of repeat concussions ( P > .05). Unconventional game schedules in the NFL, including playing on Thursday and playing overseas, do not seem to put players at increased risk of concussions.

  15. Freezing the Master Production Schedule Under Rolling Planning Horizons

    OpenAIRE

    V. Sridharan; William L. Berry; V. Udayabhanu

    1987-01-01

    The stability of the Master Production Schedule (MPS) is a critical issue in managing production operations with a Material Requirements Planning System. One method of achieving stability is to freeze some portion or all of the MPS. While freezing the MPS can limit the number of schedule changes, it can also produce an increase in production and inventory costs. This paper examines three decision variables in freezing the MPS: the freezing method, the freeze interval length, and the planning ...

  16. Adapting immunisation schedules for children undergoing chemotherapy.

    Science.gov (United States)

    Fernández-Prada, María; Rodríguez-Martínez, María; García-García, Rebeca; García-Corte, María Dolores; Martínez-Ortega, Carmen

    2018-02-01

    Children undergoing chemotherapy for cancer have special vaccination needs after completion of the treatment. The aim of this study was to evaluate the adaptation of post-chemotherapy vaccination schedules. An observational study was performed on a retrospective cohort that included all children aged from 0 to 14 years, who completed chemotherapy in a tertiary hospital between 2009 and 2015. Inclusion and exclusion criteria were applied. Immunisation was administered in accordance with the guidelines of the Vaccine Advisory Committee of the Spanish Association of Paediatrics. Primary Care immunisation and clinical records of the Preventive Medicine and Public Health Department were reviewed. Of the 99 children who had received chemotherapy, 51 (70.6% males) were included in the study. As regards the type of tumour, 54.9% had a solid organ tumour, and 45.1% had a haematological tumour. Post-chemotherapy immunisation was administered to 70.6%. The most common vaccines received were: diphtheria-tetanus-pertussis or diphtheria-tetanus (54.9%), meningococcus C (41.2%), and seasonal influenza (39.2%). The rate of adaptation of the immunisation schedule after chemotherapy was 9.8%. The pneumococcal conjugate vaccine against 7v or 13v was administered to 21.6% of study subjects. However, only 17.6% received polysaccharide 23v. None received vaccination against hepatitis A. No statistically significant differences were observed between adherence to immunisation schedules and type of tumour (P=.066), gender (P=.304), or age (P=.342). Post-chemotherapy immunisation of children with cancer is poor. The participation of health professionals in training programs and referral of paediatric cancer patients to Vaccine Units could improve the rate of schedule adaptation and proper immunisation of this population. Copyright © 2016 Elsevier España, S.L.U. and Sociedad Española de Enfermedades Infecciosas y Microbiología Clínica. All rights reserved.

  17. Examination of the Evidence Base for Using Visual Activity Schedules with Students with Intellectual Disability

    Science.gov (United States)

    Spriggs, Amy D.; Mims, Pamela J.; van Dijk, Wilhelmina; Knight, Victoria F.

    2017-01-01

    We conducted a comprehensive review of the literature to establish the evidence base for using visual activity schedules (VAS) with individuals with intellectual disability. Literature published after 2005 was evaluated for quality using the criteria developed by Horner et al.; a total of 14 studies were included as acceptable. Findings suggest…

  18. Rescheduling nursing shifts: scoping the challenge and examining the potential of mathematical model based tools.

    Science.gov (United States)

    Clark, Alistair; Moule, Pam; Topping, Annie; Serpell, Martin

    2015-05-01

    To review research in the literature on nursing shift scheduling / rescheduling, and to report key issues identified in a consultation exercise with managers in four English National Health Service trusts to inform the development of mathematical tools for rescheduling decision-making. Shift rescheduling is unrecognised as an everyday time-consuming management task with different imperatives from scheduling. Poor rescheduling decisions can have quality, cost and morale implications. A systematic critical literature review identified rescheduling issues and existing mathematic modelling tools. A consultation exercise with nursing managers examined the complex challenges associated with rescheduling. Minimal research exists on rescheduling compared with scheduling. Poor rescheduling can result in greater disruption to planned nursing shifts and may impact negatively on the quality and cost of patient care, and nurse morale and retention. Very little research examines management challenges or mathematical modelling for rescheduling. Shift rescheduling is a complex and frequent management activity that is more challenging than scheduling. Mathematical modelling may have potential as a tool to support managers to minimise rescheduling disruption. The lack of specific methodological support for rescheduling that takes into account its complexity, increases the likelihood of harm for patients and stress for nursing staff and managers. © 2013 John Wiley & Sons Ltd.

  19. Work schedule manager gap analysis : assessing the future training needs of work schedule managers using a strategic job analysis approach

    Science.gov (United States)

    2010-05-01

    This report documents the results of a strategic job analysis that examined the job tasks and knowledge, skills, abilities, and other characteristics (KSAOs) needed to perform the job of a work schedule manager. The strategic job analysis compared in...

  20. 29 CFR 825.203 - Scheduling of intermittent or reduced schedule leave.

    Science.gov (United States)

    2010-07-01

    ... leave intermittently or on a reduced leave schedule for planned medical treatment, then the employee... 29 Labor 3 2010-07-01 2010-07-01 false Scheduling of intermittent or reduced schedule leave. 825... OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Employee Leave Entitlements Under the...

  1. The Danish preventive child health examination should expand on mental health and the well-being of the family

    DEFF Research Database (Denmark)

    Lykke Nielsen, Kirsten Lykke; Graungaard, Anette Hauskov; Ertmann, Ruth

    2015-01-01

    aware of problems in the family. CONCLUSION: The preventive child health examination is an important platform for examination and dialogue concerning a child's health. The physical aspect works well, but there is a need for development of the assessment of the child's mental health and the well....... A total of nine doctors from seven clinics participated. We included 21 cases in our study, each consisting of a consultation and subsequent interviews with the child's parents and with the doctor. RESULTS: The examination of the child's physical health and development is an important feature......INTRODUCTION: In Denmark, around one in six children has significant somatic, psychological or social health problems, often in combination. The preventive child health examinations have a high participation rate; and they produce significant findings, predominantly concerning the child's physical...

  2. ATLAS construction schedule

    CERN Multimedia

    Kotamaki, M

    The goal during the last few months has been to freeze and baseline as much as possible the schedules of various ATLAS systems and activities. The main motivations for the re-baselining of the schedules have been the new LHC schedule aiming at first collisions in early 2006 and the encountered delays in civil engineering as well as in the production of some of the detectors. The process was started by first preparing a new installation schedule that takes into account all the new external constraints and the new ATLAS staging scenario. The installation schedule version 3 was approved in the March EB and it provides the Ready For Installation (RFI) milestones for each system, i.e. the date when the system should be available for the start of the installation. TCn is now interacting with the systems aiming at a more realistic and resource loaded version 4 before the end of the year. Using the new RFI milestones as driving dates a new summary schedule has been prepared, or is under preparation, for each system....

  3. Solving a More Flexible Home Health Care Scheduling and Routing Problem with Joint Patient and Nursing Staff Selection

    Directory of Open Access Journals (Sweden)

    Jamal Abdul Nasir

    2018-01-01

    Full Text Available Development of an efficient and effective home health care (HHC service system is a quite recent and challenging task for the HHC firms. This paper aims to develop an HHC service system in the perspective of long-term economic sustainability as well as operational efficiency. A more flexible mixed-integer linear programming (MILP model is formulated by incorporating the dynamic arrival and departure of patients along with the selection of new patients and nursing staff. An integrated model is proposed that jointly addresses: (i patient selection; (ii nurse hiring; (iii nurse to patient assignment; and (iv scheduling and routing decisions in a daily HHC planning problem. The proposed model extends the HHC problem from conventional scheduling and routing issues to demand and capacity management aspects. It enables an HHC firm to solve the daily scheduling and routing problem considering existing patients and nursing staff in combination with the simultaneous selection of new patients and nurses, and optimizing the existing routes by including new patients and nurses. The model considers planning issues related to compatibility, time restrictions, contract durations, idle time and workload balance. Two heuristic methods are proposed to solve the model by exploiting the variable neighborhood search (VNS approach. Results obtained from the heuristic methods are compared with a CPLEX based solution. Numerical experiments performed on different data sets, show the efficiency and effectiveness of the solution methods to handle the considered problem.

  4. Advancing the Certified in Public Health Examination: A Job Task Analysis.

    Science.gov (United States)

    Kurz, Richard S; Yager, Christopher; Yager, James D; Foster, Allison; Breidenbach, Daniel H; Irwin, Zachary

    In 2014, the National Board of Public Health Examiners performed a job task analysis (JTA) to revise the Certified in Public Health (CPH) examination. The objectives of this study were to describe the development, administration, and results of the JTA survey; to present an analysis of the survey results; and to review the implications of this first-ever public health JTA. An advisory committee of public health professionals developed a list of 200 public health job tasks categorized into 10 work domains. The list of tasks was incorporated into a web-based survey, and a snowball sample of public health professionals provided 4850 usable responses. Respondents rated job tasks as essential (4), very important (3), important (2), not very important (1), and never performed (0). The mean task importance ratings ranged from 2.61 to 3.01 (important to very important). The highest mean ratings were for tasks in the ethics domain (mean rating, 3.01). Respondents ranked 10 of the 200 tasks as the most important, with mean task rankings ranging from 2.98 to 3.39. We found subtle differences between male and female respondents and between master of public health and doctor of public health respondents in their rankings. The JTA established a set of job tasks in 10 public health work domains, and the results provided a foundation for refining the CPH examination. Additional steps are needed to further modify the content outline of the examination. An empirical assessment of public health job tasks, using methods such as principal components analysis, may provide additional insight.

  5. Developing a Customer Relationship Management Model for Better Health Examination Service

    Directory of Open Access Journals (Sweden)

    Lyu Jr-Jung

    2014-11-01

    Full Text Available People emphasize on their own health and wish to know more about their conditions. Chronic diseases now take up to 50 percent of top 10 causes of death. As a result, the health-care industry has emerged and kept thriving. This work adopts a customer-oriented business model since most clients are proactive and spontaneous in taking the “distinguished” health examination programs. We adopt the soft system dynamics methodology (SSDM to develop and to evaluate the steps of introducing customer relationship management model into a case health examination organization. Quantitative results are also presented for a case physical examination center and to assess the improved efficiency. The case study shows that the procedures developed here could provide a better service.

  6. How police officers and nurses regulate combined domestic and paid workloads to manage schedules: a gender analysis.

    Science.gov (United States)

    Caroly, Sandrine

    2011-01-01

    Our questioning focuses on the role played by the gendered division of labour and by the collective organisation of work in strategies deployed by workers in order to reconcile professional and private lives. How does work organisation facilitate schedule management so as to fit in with workers' domestic lives by offering the possibility of work activity accommodations? A comparison of two stress management studies allowed us to examine the strategies used to manage professional and private schedules. One study focused on nurses in a female environment and one study looked at police officers or a male environment recently incorporating women into the work group. In the hospital sector, management resorts to curtailing leave in order to overcome staff shortages and ensure the quality of health care; however, the female environment facilitates collective regulation to adapt work schedules. These management imposed organisational constraints are especially difficult for female staff due to their roles in the domestic sphere. It is more difficult for women to adapt work schedules in the predominantly male police officer environment. Police ask supervisors for timetable changes more frequently following the introduction of women to the group. The strategies to reconcile professional and private lives depend on division of labour and collective regulation.

  7. A DIFFERENTIAL EVOLUTION ALGORITHM DEVELOPED FOR A NURSE SCHEDULING PROBLEM

    Directory of Open Access Journals (Sweden)

    Shahnazari-Shahrezaei, P.

    2012-11-01

    Full Text Available Nurse scheduling is a type of manpower allocation problem that tries to satisfy hospital managers objectives and nurses preferences as much as possible by generating fair shift schedules. This paper presents a nurse scheduling problem based on a real case study, and proposes two meta-heuristics a differential evolution algorithm (DE and a greedy randomised adaptive search procedure (GRASP to solve it. To investigate the efficiency of the proposed algorithms, two problems are solved. Furthermore, some comparison metrics are applied to examine the reliability of the proposed algorithms. The computational results in this paper show that the proposed DE outperforms the GRASP.

  8. Simulation-based Advance Patient Scheduling of Operating Theatres

    DEFF Research Database (Denmark)

    Andersen, Anders Reenberg; Stidsen, Thomas Jacob Riis; Nielsen, Bo Friis

    2017-01-01

    Daily scheduling of surgical operations is a complicated and recurrent problem in the literature on health care optimization. In this study, we present an often overlooked approach to this problem that incorporates a rolling and overlapping planning horizon. The basis of our modeling approach is ...

  9. Is There a Downside to Schedule Control for the Work-Family Interface?

    Science.gov (United States)

    Schieman, Scott; Young, Marisa

    2010-01-01

    Using data from a 2007 U.S. survey of workers, this article examines the implications of schedule control for work-family role blurring and work-family conflict. Four main findings indicate that (a) schedule control is associated with more frequent working at home and work-family multitasking activities; (b) the positive association between…

  10. Artificial intelligence for the CTA Observatory scheduler

    Science.gov (United States)

    Colomé, Josep; Colomer, Pau; Campreciós, Jordi; Coiffard, Thierry; de Oña, Emma; Pedaletti, Giovanna; Torres, Diego F.; Garcia-Piquer, Alvaro

    2014-08-01

    The Cherenkov Telescope Array (CTA) project will be the next generation ground-based very high energy gamma-ray instrument. The success of the precursor projects (i.e., HESS, MAGIC, VERITAS) motivated the construction of this large infrastructure that is included in the roadmap of the ESFRI projects since 2008. CTA is planned to start the construction phase in 2015 and will consist of two arrays of Cherenkov telescopes operated as a proposal-driven open observatory. Two sites are foreseen at the southern and northern hemispheres. The CTA observatory will handle several observation modes and will have to operate tens of telescopes with a highly efficient and reliable control. Thus, the CTA planning tool is a key element in the control layer for the optimization of the observatory time. The main purpose of the scheduler for CTA is the allocation of multiple tasks to one single array or to multiple sub-arrays of telescopes, while maximizing the scientific return of the facility and minimizing the operational costs. The scheduler considers long- and short-term varying conditions to optimize the prioritization of tasks. A short-term scheduler provides the system with the capability to adapt, in almost real-time, the selected task to the varying execution constraints (i.e., Targets of Opportunity, health or status of the system components, environment conditions). The scheduling procedure ensures that long-term planning decisions are correctly transferred to the short-term prioritization process for a suitable selection of the next task to execute on the array. In this contribution we present the constraints to CTA task scheduling that helped classifying it as a Flexible Job-Shop Problem case and finding its optimal solution based on Artificial Intelligence techniques. We describe the scheduler prototype that uses a Guarded Discrete Stochastic Neural Network (GDSN), for an easy representation of the possible long- and short-term planning solutions, and Constraint

  11. The 12-item World Health Organization Disability Assessment Schedule II (WHO-DAS II: a nonparametric item response analysis

    Directory of Open Access Journals (Sweden)

    Fernandez Ana

    2010-05-01

    Full Text Available Abstract Background Previous studies have analyzed the psychometric properties of the World Health Organization Disability Assessment Schedule II (WHO-DAS II using classical omnibus measures of scale quality. These analyses are sample dependent and do not model item responses as a function of the underlying trait level. The main objective of this study was to examine the effectiveness of the WHO-DAS II items and their options in discriminating between changes in the underlying disability level by means of item response analyses. We also explored differential item functioning (DIF in men and women. Methods The participants were 3615 adult general practice patients from 17 regions of Spain, with a first diagnosed major depressive episode. The 12-item WHO-DAS II was administered by the general practitioners during the consultation. We used a non-parametric item response method (Kernel-Smoothing implemented with the TestGraf software to examine the effectiveness of each item (item characteristic curves and their options (option characteristic curves in discriminating between changes in the underliying disability level. We examined composite DIF to know whether women had a higher probability than men of endorsing each item. Results Item response analyses indicated that the twelve items forming the WHO-DAS II perform very well. All items were determined to provide good discrimination across varying standardized levels of the trait. The items also had option characteristic curves that showed good discrimination, given that each increasing option became more likely than the previous as a function of increasing trait level. No gender-related DIF was found on any of the items. Conclusions All WHO-DAS II items were very good at assessing overall disability. Our results supported the appropriateness of the weights assigned to response option categories and showed an absence of gender differences in item functioning.

  12. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1994-02-01

    This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of the onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site

  13. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1994-02-01

    This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of the onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site.

  14. Discordance between 'actual' and 'scheduled' check-in times at a heart failure clinic.

    Directory of Open Access Journals (Sweden)

    Eiran Z Gorodeski

    Full Text Available A 2015 Institute Of Medicine statement "Transforming Health Care Scheduling and Access: Getting to Now", has increased concerns regarding patient wait times. Although waiting times have been widely studied, little attention has been paid to the role of patient arrival times as a component of this phenomenon. To this end, we investigated patterns of patient arrival at scheduled ambulatory heart failure (HF clinic appointments and studied its predictors. We hypothesized that patients are more likely to arrive later than scheduled, with progressively later arrivals later in the day.Using a business intelligence database we identified 6,194 unique patients that visited the Cleveland Clinic Main Campus HF clinic between January, 2015 and January, 2017. This clinic served both as a tertiary referral center and a community HF clinic. Transplant and left ventricular assist device (LVAD visits were excluded. Punctuality was defined as the difference between 'actual' and 'scheduled' check-in times, whereby negative values (i.e., early punctuality were patients who checked-in early. Contrary to our hypothesis, we found that patients checked-in late only a minority of the time (38% of visits. Additionally, examining punctuality by appointment hour slot we found that patients scheduled after 8AM had progressively earlier check-in times as the day progressed (P < .001 for trend. In both a Random Forest-Regression framework and linear regression models the most important risk-adjusted predictors of early punctuality were: later in the day appointment hour slot, patient having previously been to the hospital, age in the early 70s, and white race.Patients attending a mixed population ambulatory HF clinic check-in earlier than scheduled times, with progressive discrepant intervals throughout the day. This finding may have significant implications for provider utilization and resource planning in order to maximize clinic efficiency. The impact of elective early

  15. Integrating job scheduling and constrained network routing

    DEFF Research Database (Denmark)

    Gamst, Mette

    2010-01-01

    This paper examines the NP-hard problem of scheduling jobs on resources such that the overall profit of executed jobs is maximized. Job demand must be sent through a constrained network to the resource before execution can begin. The problem has application in grid computing, where a number...

  16. Constraint-based scheduling applying constraint programming to scheduling problems

    CERN Document Server

    Baptiste, Philippe; Nuijten, Wim

    2001-01-01

    Constraint Programming is a problem-solving paradigm that establishes a clear distinction between two pivotal aspects of a problem: (1) a precise definition of the constraints that define the problem to be solved and (2) the algorithms and heuristics enabling the selection of decisions to solve the problem. It is because of these capabilities that Constraint Programming is increasingly being employed as a problem-solving tool to solve scheduling problems. Hence the development of Constraint-Based Scheduling as a field of study. The aim of this book is to provide an overview of the most widely used Constraint-Based Scheduling techniques. Following the principles of Constraint Programming, the book consists of three distinct parts: The first chapter introduces the basic principles of Constraint Programming and provides a model of the constraints that are the most often encountered in scheduling problems. Chapters 2, 3, 4, and 5 are focused on the propagation of resource constraints, which usually are responsibl...

  17. Health Status, Intention to Seek Health Examination, and Participation in Health Education Among Taxi Drivers in Jinan, China

    Science.gov (United States)

    Yang, Yan; Fan, Xiao-sheng; Tian, Cui-huan; Zhang, Wei; Li, Jie; Li, Shu-qing

    2014-01-01

    Background: Taxi drivers are exposed to various risk factors such as work overload, stress, an irregular diet, and a sedentary lifestyle, which make these individuals vulnerable to many diseases. This study was designed to assess the health status of this occupational group. Objectives: The objective was to explore the health status, the intention to seek health examination, and participation in health education among taxi drivers in Jinan, China. Patients and Methods: The sample-size was determined scientifically. The systematic sampling procedure was used for selecting the sample. Four hundred taxi drivers were randomly selected from several taxi companies in Jinan. In total, 396 valid questionnaires (from 370 males and 26 females) were returned. Health status, intention to seek health examination, and participation in health education were assessed by a self-designed questionnaire. Other personal information including sex, age, ethnicity, marital status, years of employment as a taxi driver, education level, and habits were also collected. Results: This survey revealed that 54.8% of taxi drivers reported illness in the last two weeks and 44.7% of participants reported chronic diseases. The prevalence rates of hypertension, diabetes mellitus, gastroenteritis, arthritis, and heart disease were 18.2%, 8.8%, 26%, 18.4%, and 4.8% of questioned taxi drivers, respectively. Significant self-reported symptoms included fatigue, waist and back pain, headache, dyspepsia, and dry throat affecting 49.7%, 26.2%, 23.5%, 26%, and 27% of participants, respectively. In total, 90.1% of subjects thought that it was necessary to receive a regular health examination. Only 17.9% of subjects had been given information about health education, and significantly, more than 87% of subjects who had been given information about health education reported that the information had been helpful. Conclusions: Taxi drivers’ health was poor in our survey. Thus, using health education interventions

  18. Scheduling for decommissioning projects

    International Nuclear Information System (INIS)

    Podmajersky, O.E.

    1987-01-01

    This paper describes the Project Scheduling system being employed by the Decommissioning Operations Contractor at the Shippingport Station Decommissioning Project (SSDP). Results from the planning system show that the project continues to achieve its cost and schedule goals. An integrated cost and schedule control system (C/SCS) which uses the concept of earned value for measurement of performance was instituted in accordance with DOE orders. The schedule and cost variances generated by the C/SCS system are used to confirm management's assessment of project status. This paper describes the types of schedules and tools used on the SSDP project to plan and monitor the work, and identifies factors that are unique to a decommissioning project that make scheduling critical to the achievement of the project's goals. 1 fig

  19. Program reference schedule baseline

    International Nuclear Information System (INIS)

    1986-07-01

    This Program Reference Schedule Baseline (PRSB) provides the baseline Program-level milestones and associated schedules for the Civilian Radioactive Waste Management Program. It integrates all Program-level schedule-related activities. This schedule baseline will be used by the Director, Office of Civilian Radioactive Waste Management (OCRWM), and his staff to monitor compliance with Program objectives. Chapter 1 includes brief discussions concerning the relationship of the PRSB to the Program Reference Cost Baseline (PRCB), the Mission Plan, the Project Decision Schedule, the Total System Life Cycle Cost report, the Program Management Information System report, the Program Milestone Review, annual budget preparation, and system element plans. Chapter 2 includes the identification of all Level 0, or Program-level, milestones, while Chapter 3 presents and discusses the critical path schedules that correspond to those Level 0 milestones

  20. Second-order schedules of token reinforcement with pigeons: effects of fixed- and variable-ratio exchange schedules.

    Science.gov (United States)

    Foster, T A; Hackenberg, T D; Vaidya, M

    2001-09-01

    Pigeons' key pecks produced food under second-order schedules of token reinforcement, with light-emitting diodes serving as token reinforcers. In Experiment 1, tokens were earned according to a fixed-ratio 50 schedule and were exchanged for food according to either fixed-ratio or variable-ratio exchange schedules, with schedule type varied across conditions. In Experiment 2, schedule type was varied within sessions using a multiple schedule. In one component, tokens were earned according to a fixed-ratio 50 schedule and exchanged according to a variable-ratio schedule. In the other component, tokens were earned according to a variable-ratio 50 schedule and exchanged according to a fixed-ratio schedule. In both experiments, the number of responses per exchange was varied parametrically across conditions, ranging from 50 to 400 responses. Response rates decreased systematically with increases in the fixed-ratio exchange schedules, but were much less affected by changes in the variable-ratio exchange schedules. Response rates were consistently higher under variable-ratio exchange schedules than tinder comparable fixed-ratio exchange schedules, especially at higher exchange ratios. These response-rate differences were due both to greater pre-ratio pausing and to lower local rates tinder the fixed-ratio exchange schedules. Local response rates increased with proximity to food under the higher fixed-ratio exchange schedules, indicative of discriminative control by the tokens.

  1. Constraint-based scheduling

    Science.gov (United States)

    Zweben, Monte

    1993-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  2. A critical examination of the health workers\\' civil and criminal liabilities

    African Journals Online (AJOL)

    This paper set out to examine the subject matter of health and welfare administration and the human resources thereto to achieve the set objectives of health and welfare policies of the Government. It also aimed at examining the behaviour of the professionals in the hospitals, the ethical principles, law guiding their behavior ...

  3. Health examination for A-bomb survivors

    International Nuclear Information System (INIS)

    Ito, Chikako

    1996-01-01

    The health examination for A-bomb survivors by national, prefectural and city administrations was described and discussed on its general concept, history, time change of examinee number, improvement of examination, prevalence of individual diseases, significance of cancer examinations, examinees' point of view and future problems. Subjects were the survivors living in Hiroshima city: in 1994, their number was 100,188, whose ages were 63 y in average for males consisting of 39.5% and 67 y for females of 60.5%. The examination was begun in 1957 on the law for medical care for the survivors firstly and then systematically in 1961. From 1965, it was performed 4 times a year, and in 1988, one examination in the four was made for cancer. Authors' Center examined previously 90% but recently 70% of the examinees. The remainder underwent the examination in other medical facilities. Tests are blood analysis, electrocardiography and computed radiography of chest with imaging plate, of which data have been accumulated either in photodisc or in host computer. From 1973 to 1993, the cardiovascular diseases increased from 6.1% to 26.9%, metabolic and endocrinic ones like diabetes, 3.6% to 19.7%, and bowel ones, 0.9% to 12.3%. Correlations of these diseases with A-bomb irradiation are not elucidated and possibly poor. Five classes of cancer examinations are performed but the examinee rate in the survivors is as low as 7.6-21.8% (1993). The cancer of the large intestine is increasing. The overall examinee rates in the survivors were 70.6% in 1965-1967, 69.5% in 1976-1977 and 58.2% in 1990. In conclusion, how to examine the survivors, who are getting older, as many as possible is the future problem. (H.O.)

  4. Game injuries in relation to game schedules in the National Basketball Association.

    Science.gov (United States)

    Teramoto, Masaru; Cross, Chad L; Cushman, Daniel M; Maak, Travis G; Petron, David J; Willick, Stuart E

    2017-03-01

    Injury management is critical in the National Basketball Association (NBA), as players experience a wide variety of injuries. Recently, it has been suggested that game schedules, such as back-to-back games and four games in five days, increase the risk of injuries in the NBA. The aim of this study was to examine the association between game schedules and player injuries in the NBA. Descriptive epidemiology study. The present study analyzed game injuries and game schedules in the 2012-13 through 2014-15 regular seasons. Game injuries by game schedules and players' profiles were examined using an exact binomial test, the Fisher's exact test and the Mann-Whitney-Wilcoxon test. A Poisson regression analysis was performed to predict the number of game injuries sustained by each player from game schedules and injured players' profiles. There were a total of 681 cases of game injuries sustained by 280 different players during the three years (total N=1443 players). Playing back-to-back games or playing four games in five days alone was not associated with an increased rate of game injuries, whereas a significant positive association was found between game injuries and playing away from home (pNBA. The findings could be useful for designing optimal game schedules in the NBA as well as helping NBA teams make adjustments to minimize game injuries. Copyright © 2016 Sports Medicine Australia. Published by Elsevier Ltd. All rights reserved.

  5. The nurse scheduling problem: a goal programming and nonlinear optimization approaches

    Science.gov (United States)

    Hakim, L.; Bakhtiar, T.; Jaharuddin

    2017-01-01

    Nurses scheduling is an activity of allocating nurses to conduct a set of tasks at certain room at a hospital or health centre within a certain period. One of obstacles in the nurse scheduling is the lack of resources in order to fulfil the needs of the hospital. Nurse scheduling which is undertaken manually will be at risk of not fulfilling some nursing rules set by the hospital. Therefore, this study aimed to perform scheduling models that satisfy all the specific rules set by the management of Bogor State Hospital. We have developed three models to overcome the scheduling needs. Model 1 is designed to schedule nurses who are solely assigned to a certain inpatient unit and Model 2 is constructed to manage nurses who are assigned to an inpatient room as well as at Polyclinic room as conjunct nurses. As the assignment of nurses on each shift is uneven, then we propose Model 3 to minimize the variance of the workload in order to achieve equitable assignment on every shift. The first two models are formulated in goal programming framework, while the last model is in nonlinear optimization form.

  6. Development of a Customizable Health IT Usability Evaluation Scale

    Science.gov (United States)

    Yen, Po-Yin; Wantland, Dean; Bakken, Suzanne

    2010-01-01

    We developed a customizable questionnaire, the Health Information Technology (IT) Usability Evaluation Scale (Health-ITUES) and conducted an exploratory factor analysis to examine the scale’s psychometric properties. Nurses (n=377) completed Health-ITUES to rate the usability of a web-based communication system for scheduling nursing staff. The analysis revealed a four-factor structure of Health-ITUES. The results provided preliminary evidence for the factorial validity and internal consistency reliability of Health-ITUES. PMID:21347112

  7. Physician variation in perceived barriers to personal health

    Directory of Open Access Journals (Sweden)

    Rubenfire M

    2012-01-01

    Full Text Available Adam RB Kosteva1, Brian M Salata1, Sangeetha Mahadevan Krishnan2, Michael Howe3, Alissa Weber3, Melvyn Rubenfire2,3, Elizabeth A Jackson2,31Michigan Cardiovascular Research and Reporting Program, 2Division of Cardiovascular Medicine, 3Department of Internal Medicine, University of Michigan Health System, Ann Arbor, MI, USAObjective: Physicians’ personal health habits are associated with their counseling habits regarding physical activity. We sought to examine physicians’ own barriers to a healthy lifestyle by level of training and gender.Methods: Physicians at a major teaching hospital were surveyed regarding their lifestyle habits and barriers to healthy habits. The frequency of reported barriers was examined by years in practice (trainees vs staff physicians and gender.Results: 183 total responses were received. Over 20% of respondents were overweight. Work schedule was cited as the greatest barrier to regular exercise in 70.5% of respondents. Trainees were more likely to cite time constraints or cost as a barrier to a healthy diet compared to staff physicians. Staff physicians were more likely to report the time to prepare healthy foods as a barrier. For both trainees and staff physicians, time was a barrier to regular exercise. For trainees work schedule was a barrier, while both work schedule and family commitments were top barriers cited by staff physicians. Women were more likely to report family commitments as a barrier than men. Respondents suggested healthier options in vending machines and the hospital cafeteria, healthy recipes, and time and/or facilities for exercise at work as options to help overcome these barriers.Conclusion: Work schedules and family commitments are frequently reported by providers as barriers to healthy lifestyle. Efforts to reduce such barriers may lead to improved health habits among providers.Keywords: diet, exercise, counseling, prevention, gender, barriers, health

  8. Comparison of job stress and obesity in nurses with favorable and unfavorable work schedules.

    Science.gov (United States)

    Han, Kihye; Trinkoff, Alison M; Storr, Carla L; Geiger-Brown, Jeanne; Johnson, Karen L; Park, Sungae

    2012-08-01

    To compare obesity-related factors between female nurses with favorable work schedules (WSs) and unfavorable WSs. In a cross-sectional study, 1724 female nurses were stratified by WS (favorable vs unfavorable). For each schedule type, the odds of obesity were related to health behaviors, home demands, and job stress using logistic regression models. Among nurses with unfavorable WSs, healthy behaviors (exercise, sleep) were inversely associated with obesity, whereas for those with favorable WSs, obese nurses reported significantly more unhealthy behaviors (smoking, alcohol use; odds ratio [OR], 1.19; 95% confidence interval [CI], 1.02-1.38), more physical lifting of children/dependents (OR, 1.43; 95% CI, 1.06-1.93), having more nurse input into their jobs (OR, 1.21; 95% CI, 1.02-1.44), yet less boss support at work (OR, 0.83; 95% CI, 0.68-0.99). Considering impacts of WSs on obesity and potential obesity-related health outcomes, healthful scheduling should be provided to nurses.

  9. Multimodal processes scheduling in mesh-like network environment

    Directory of Open Access Journals (Sweden)

    Bocewicz Grzegorz

    2015-06-01

    Full Text Available Multimodal processes planning and scheduling play a pivotal role in many different domains including city networks, multimodal transportation systems, computer and telecommunication networks and so on. Multimodal process can be seen as a process partially processed by locally executed cyclic processes. In that context the concept of a Mesh-like Multimodal Transportation Network (MMTN in which several isomorphic subnetworks interact each other via distinguished subsets of common shared intermodal transport interchange facilities (such as a railway station, bus station or bus/tram stop as to provide a variety of demand-responsive passenger transportation services is examined. Consider a mesh-like layout of a passengers transport network equipped with different lines including buses, trams, metro, trains etc. where passenger flows are treated as multimodal processes. The goal is to provide a declarative model enabling to state a constraint satisfaction problem aimed at multimodal transportation processes scheduling encompassing passenger flow itineraries. Then, the main objective is to provide conditions guaranteeing solvability of particular transport lines scheduling, i.e. guaranteeing the right match-up of local cyclic acting bus, tram, metro and train schedules to a given passengers flow itineraries.

  10. Homework schedule: an important factor associated with shorter sleep duration among Chinese school-aged children.

    Science.gov (United States)

    Li, Shenghui; Yang, Qian; Chen, Zhe; Jin, Xingming; Jiang, Fan; Shen, Xiaoming

    2014-09-03

    This study was designed to examine the hypothesis that homework schedule has adverse impacts on Chinese children's sleep-wake habits and sleep duration. A random sample of 19,299 children aged 5.08 to 11.99 years old participated in a large, cross-sectional survey. A parent-administered questionnaire was completed to quantify children's homework schedule and sleep behaviors. Generally, it was demonstrated that more homework schedule was significantly associated with later bedtime, later wake time, and shorter sleep duration. Among all sleep variables, bedtime and sleep duration during weekdays appeared to be most affected by homework schedule, especially homework schedule during weekdays.

  11. How should periods without social interaction be scheduled? Children's preference for practical schedules of positive reinforcement.

    Science.gov (United States)

    Luczynski, Kevin C; Hanley, Gregory P

    2014-01-01

    Several studies have shown that children prefer contingent reinforcement (CR) rather than yoked noncontingent reinforcement (NCR) when continuous reinforcement is programmed in the CR schedule. Preference has not, however, been evaluated for practical schedules that involve CR. In Study 1, we assessed 5 children's preference for obtaining social interaction via a multiple schedule (periods of fixed-ratio 1 reinforcement alternating with periods of extinction), a briefly signaled delayed reinforcement schedule, and an NCR schedule. The multiple schedule promoted the most efficient level of responding. In general, children chose to experience the multiple schedule and avoided the delay and NCR schedules, indicating that they preferred multiple schedules as the means to arrange practical schedules of social interaction. In Study 2, we evaluated potential controlling variables that influenced 1 child's preference for the multiple schedule and found that the strong positive contingency was the primary variable. © Society for the Experimental Analysis of Behavior.

  12. The comparison of predictive scheduling algorithms for different sizes of job shop scheduling problems

    Science.gov (United States)

    Paprocka, I.; Kempa, W. M.; Grabowik, C.; Kalinowski, K.; Krenczyk, D.

    2016-08-01

    In the paper a survey of predictive and reactive scheduling methods is done in order to evaluate how the ability of prediction of reliability characteristics influences over robustness criteria. The most important reliability characteristics are: Mean Time to Failure, Mean Time of Repair. Survey analysis is done for a job shop scheduling problem. The paper answers the question: what method generates robust schedules in the case of a bottleneck failure occurrence before, at the beginning of planned maintenance actions or after planned maintenance actions? Efficiency of predictive schedules is evaluated using criteria: makespan, total tardiness, flow time, idle time. Efficiency of reactive schedules is evaluated using: solution robustness criterion and quality robustness criterion. This paper is the continuation of the research conducted in the paper [1], where the survey of predictive and reactive scheduling methods is done only for small size scheduling problems.

  13. Prioritizing sleep for healthy work schedules

    Science.gov (United States)

    2012-01-01

    Good sleep is advantageous to the quality of life. Sleep-related benefits are particularly helpful for the working class, since poor or inadequate amounts of sleep degrade work productivity and overall health. This review paper explores the essential role of sleep in healthy work schedules and primarily focuses on the timing of sleep in relation to the work period (that is, before, during and after work). Data from laboratory, field and modeling studies indicate that consistent amounts of sleep prior to work are fundamental to improved performance and alertness in the workplace. In addition, planned naps taken during work maintain appropriate levels of waking function for both daytime and night-time work. Clearly, sufficient sleep after work is vital in promoting recovery from fatigue. Recent data also suggest that the time interval between shifts should be adjusted according to the biological timing of sleep. Although sleep is more likely to be replaced by job and other activities in the real life, research shows that it is worthwhile to revise the work schedules in order to optimize sleep before, sometime during and after the work period. Therefore, we suggest establishing work-sleep balance, similar to work-life balance, as a principle for designing and improving work schedules. PMID:22738292

  14. Prioritizing sleep for healthy work schedules

    Directory of Open Access Journals (Sweden)

    Takahashi Masaya

    2012-03-01

    Full Text Available Abstract Good sleep is advantageous to the quality of life. Sleep-related benefits are particularly helpful for the working class, since poor or inadequate amounts of sleep degrade work productivity and overall health. This review paper explores the essential role of sleep in healthy work schedules and primarily focuses on the timing of sleep in relation to the work period (that is, before, during and after work. Data from laboratory, field and modeling studies indicate that consistent amounts of sleep prior to work are fundamental to improved performance and alertness in the workplace. In addition, planned naps taken during work maintain appropriate levels of waking function for both daytime and night-time work. Clearly, sufficient sleep after work is vital in promoting recovery from fatigue. Recent data also suggest that the time interval between shifts should be adjusted according to the biological timing of sleep. Although sleep is more likely to be replaced by job and other activities in the real life, research shows that it is worthwhile to revise the work schedules in order to optimize sleep before, sometime during and after the work period. Therefore, we suggest establishing work-sleep balance, similar to work-life balance, as a principle for designing and improving work schedules.

  15. Prioritizing sleep for healthy work schedules.

    Science.gov (United States)

    Takahashi, Masaya

    2012-03-13

    Good sleep is advantageous to the quality of life. Sleep-related benefits are particularly helpful for the working class, since poor or inadequate amounts of sleep degrade work productivity and overall health. This review paper explores the essential role of sleep in healthy work schedules and primarily focuses on the timing of sleep in relation to the work period (that is, before, during and after work). Data from laboratory, field and modeling studies indicate that consistent amounts of sleep prior to work are fundamental to improved performance and alertness in the workplace. In addition, planned naps taken during work maintain appropriate levels of waking function for both daytime and night-time work. Clearly, sufficient sleep after work is vital in promoting recovery from fatigue. Recent data also suggest that the time interval between shifts should be adjusted according to the biological timing of sleep. Although sleep is more likely to be replaced by job and other activities in the real life, research shows that it is worthwhile to revise the work schedules in order to optimize sleep before, sometime during and after the work period. Therefore, we suggest establishing work-sleep balance, similar to work-life balance, as a principle for designing and improving work schedules.

  16. Scheduling with Time Lags

    NARCIS (Netherlands)

    X. Zhang (Xiandong)

    2010-01-01

    textabstractScheduling is essential when activities need to be allocated to scarce resources over time. Motivated by the problem of scheduling barges along container terminals in the Port of Rotterdam, this thesis designs and analyzes algorithms for various on-line and off-line scheduling problems

  17. Mental Health Problems in Adults with Williams Syndrome

    Science.gov (United States)

    Stinton, Chris; Elison, Sarah; Howlin, Patricia

    2010-01-01

    Although many researchers have investigated emotional and behavioral difficulties in individuals with Williams syndrome, few have used standardized diagnostic assessments. We examined mental health problems in 92 adults with Williams syndrome using the Psychiatric Assessment Schedule for Adults with Developmental Disabilities--PAS-ADD (Moss,…

  18. 78 FR 47319 - Fee Schedule for Reference Biological Standards and Biological Preparations

    Science.gov (United States)

    2013-08-05

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Fee Schedule for Reference Biological Standards and Biological Preparations AGENCY: Centers for Disease Control and... for Disease Control and Prevention (CDC), located within the Department of Health and Human Services...

  19. Accounting for Inpatient Wards when developing Master Surgical Schedules

    NARCIS (Netherlands)

    Vanberkel, P.T.; Boucherie, Richardus J.; Hans, Elias W.; Hurink, Johann L.; van Lent, W.A.M.; van Harten, Willem H.; van Harten, Wim H.

    BACKGROUND: As the demand for health care services increases, the need to improve patient flow between departments has likewise increased. Understanding how the master surgical schedule (MSS) affects the inpatient wards and exploiting this relationship can lead to a decrease in surgery

  20. Master schedule for CY-1979 Hanford environmental surveillance routine program

    International Nuclear Information System (INIS)

    Blumer, P.J.; Houston, J.R.; Eddy, P.A.

    1978-12-01

    The current schedule of data collection for the routine environmental surveillance program at the Hanford Site, as conducted by the Environmental Evaluation Section of Battelle, Pacific Northwest Laboratory for the Department of Energy (DOE), is given. Modifications to the schedule are made during the year and special areas of study, usually of short duration, are not scheduled. The environmental surveillance program objectives are to evaluate the levels of radioactive and nonradioactive pollutants in the Hanford environs, and to monitor Hanford operations for compliance with applicable environmental criteria and Washington State Water Quality Standards. Air quality data are obtained in a separate program administered by the Hanford Environmental Health Foundation. The collection schedule for potable water is shown but it is not part of the routine environmental surveillance program. Water quality data for Hanford Site potable water systems are published each year by the Hanford Environmental Health Foundation. The data collected are available in routine reports issued by the Environmental Evaluations staff. Groundwater data and evaluation are reported in the series, ''Radiological Status of the Groundwater Beneath the Hanford Project for...,'' the latest issue being PNL-2624 for CY-1977. Data from locations within the plant boundaries are presented in the annual ''Environmental Status of the Hanford Site for...'' report series, the most recent report being PNL-2677 for 1977. Data from offsite locations are presented in the annual ''Environmental Surveillance at Hanford for...'' series of reports, the latest being PNL-2614 for 1977

  1. Data Model Approach And Markov Chain Based Analysis Of Multi-Level Queue Scheduling

    Directory of Open Access Journals (Sweden)

    Diwakar Shukla

    2010-01-01

    Full Text Available There are many CPU scheduling algorithms inliterature like FIFO, Round Robin, Shortest-Job-First and so on.The Multilevel-Queue-Scheduling is superior to these due to itsbetter management of a variety of processes. In this paper, aMarkov chain model is used for a general setup of Multilevelqueue-scheduling and the scheduler is assumed to performrandom movement on queue over the quantum of time.Performance of scheduling is examined through a rowdependent data model. It is found that with increasing value of αand d, the chance of system going over the waiting state reduces.At some of the interesting combinations of α and d, it diminishesto zero, thereby, provides us some clue regarding better choice ofqueues over others for high priority jobs. It is found that ifqueue priorities are added in the scheduling intelligently thenbetter performance could be obtained. Data model helpschoosing appropriate preferences.

  2. Automated Scheduling Via Artificial Intelligence

    Science.gov (United States)

    Biefeld, Eric W.; Cooper, Lynne P.

    1991-01-01

    Artificial-intelligence software that automates scheduling developed in Operations Mission Planner (OMP) research project. Software used in both generation of new schedules and modification of existing schedules in view of changes in tasks and/or available resources. Approach based on iterative refinement. Although project focused upon scheduling of operations of scientific instruments and other equipment aboard spacecraft, also applicable to such terrestrial problems as scheduling production in factory.

  3. Examining physicians’ preparedness for tobacco cessation services in India: Findings from primary care public health facilities in two Indian states

    Directory of Open Access Journals (Sweden)

    Rajmohan Panda

    2013-03-01

    Full Text Available BackgroundA total of 275 million tobacco users live throughout India and are in need of tobacco cessation services. However, the preparation of physicians to deliver this service at primary care health facilities remains unknown.AimsThe study aimed to examine the primary care physicians’ preparedness to deliver tobacco cessation services in two Indian states.MethodResearchers surveyed physicians working in primary care public health facilities, primarily in rural areas using a semistructured interview schedule. Physicians’ preparedness was defined in the study as those possessing knowledge of tobacco cessation methods and exhibiting a positive attitude towards the benefits of tobacco cessation counselling as well as being willing to be part of tobacco prevention or cessation program.ResultsOverall only 17% of physicians demonstrated adequate preparation to provide tobacco cessation services at primary care health facilities in both the States. The findings revealed minimal tobacco cessation training during formal medical education (21.3% and on-the-job training (18.9%. Factors, like sex and age of service provider, type of health facility, location of health facility and number of patients attended by the service provider, failed to show significance during bivariate and regression analysis. Preparedness was significantly predicted by state health system.ConclusionThe study highlights a lack of preparedness of primary care physicians to deliver tobacco cessation services. Both the curriculum in medical school and on-the-job training require an addition of a learning component on tobacco cessation. The addition of this component will enable existing primary care facilities to deliver tobacco cessation services.

  4. Schedule Analytics

    Science.gov (United States)

    2016-04-30

    Warfare, Naval Sea Systems Command Acquisition Cycle Time : Defining the Problem David Tate, Institute for Defense Analyses Schedule Analytics Jennifer...research was comprised of the following high- level steps :  Identify and review primary data sources 1...research. However, detailed reviews of the OMB IT Dashboard data revealed that schedule data is highly aggregated. Program start date and program end date

  5. Preemptive scheduling with rejection

    NARCIS (Netherlands)

    Hoogeveen, H.; Skutella, M.; Woeginger, Gerhard

    2003-01-01

    We consider the problem of preemptively scheduling a set of n jobs on m (identical, uniformly related, or unrelated) parallel machines. The scheduler may reject a subset of the jobs and thereby incur job-dependent penalties for each rejected job, and he must construct a schedule for the remaining

  6. Preemptive scheduling with rejection

    NARCIS (Netherlands)

    Hoogeveen, J.A.; Skutella, M.; Woeginger, G.J.; Paterson, M.

    2000-01-01

    We consider the problem of preemptively scheduling a set of n jobs on m (identical, uniformly related, or unrelated) parallel machines. The scheduler may reject a subset of the jobs and thereby incur job-dependent penalties for each rejected job, and he must construct a schedule for the remaining

  7. Scheduling Non-Preemptible Jobs to Minimize Peak Demand

    Directory of Open Access Journals (Sweden)

    Sean Yaw

    2017-10-01

    Full Text Available This paper examines an important problem in smart grid energy scheduling; peaks in power demand are proportionally more expensive to generate and provision for. The issue is exacerbated in local microgrids that do not benefit from the aggregate smoothing experienced by large grids. Demand-side scheduling can reduce these peaks by taking advantage of the fact that there is often flexibility in job start times. We focus attention on the case where the jobs are non-preemptible, meaning once started, they run to completion. The associated optimization problem is called the peak demand minimization problem, and has been previously shown to be NP-hard. Our results include an optimal fixed-parameter tractable algorithm, a polynomial-time approximation algorithm, as well as an effective heuristic that can also be used in an online setting of the problem. Simulation results show that these methods can reduce peak demand by up to 50% versus on-demand scheduling for household power jobs.

  8. Illicit online marketing of lorcaserin before DEA scheduling.

    Science.gov (United States)

    Liang, Bryan A; Mackey, Tim K; Archer-Hayes, Ashley N; Shinn, Linda M

    2013-05-01

    Antiobesity drugs have been marketed illicitly by "no prescription" online pharmacies after approval and scheduling by the drug enforcement agency. We assess whether antiobesity drug Belviq® (lorcaserin HCl) was available from illicit online vendors before DEA-scheduling when sales are unauthorized. Online searches of "buy Belviq no prescription" examining first five result pages marketing the drug. Searches were performed from 11/5/2012-12/8/2012, prior to DEA scheduing. Belviq® is actively marketed by "no prescription" online vendors despite official unavailability and prescription requirements. Approaches included direct-to-consumer advertising using descriptive website URLs; linking to illicit marketers; and directing customers to other weight-loss websites for additional marketing. Finally, large quantities were marketed by business-to-business vendors. Illicit online "no prescription" pharmacies are marketing unauthorized, suspect antiobesity drugs before DEA scheduling and permitted marketing. Regulators must legally intercede to ensure patient safety, and providers must educate patients about online-sourcing risks. Copyright © 2013 The Obesity Society.

  9. Verification of reliability and validity of a Japanese version of the Rathus Assertiveness Schedule.

    Science.gov (United States)

    Suzuki, Eiko; Kanoya, Yuka; Katsuki, Takeshi; Sato, Chifumi

    2007-07-01

    To verify the reliability and validity of a Japanese version of the Rathus Assertiveness Schedule in novice nurses to contribute to nursing management. An adequate scale is needed to measure the assertiveness and the effect of assertion training for Japanese nurses and to compare them with those in other countries. Rathus Assertiveness Schedule was adapted to Japanese with back-translation and its validity was examined in 989 novice nurses. The Japanese version showed a high coefficient of reliability in a split-half reliability test (r=0.76; PAssertiveness Schedule. The Japanese version of Rathus Assertiveness Schedule was verified.

  10. Designing cyclic appointment schedules for outpatient clinics with scheduled and unscheduled patient arrivals

    NARCIS (Netherlands)

    Kortbeek, Nikky; Zonderland, Maartje E.; Braaksma, Aleida; Vliegen, Ingrid M. H.; Boucherie, Richard J.; Litvak, Nelly; Hans, Erwin W.

    2014-01-01

    We present a methodology to design appointment systems for outpatient clinics and diagnostic facilities that offer both walk-in and scheduled service. The developed blueprint for the appointment schedule prescribes the number of appointments to plan per day and the moment on the day to schedule the

  11. Designing cyclic appointment schedules for outpatient clinics with scheduled and unscheduled patient arrivals

    NARCIS (Netherlands)

    Kortbeek, Nikky; Zonderland, Maartje Elisabeth; Boucherie, Richardus J.; Litvak, Nelli; Hans, Elias W.

    2011-01-01

    We present a methodology to design appointment systems for outpatient clinics and diagnostic facilities that offer both walk-in and scheduled service. The developed blueprint for the appointment schedule prescribes the number of appointments to plan per day and the moment on the day to schedule the

  12. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1992-03-01

    Title 44 United States Code, ''Public Printing and Documents,'' regulations cited in the General Services Administration's (GSA) ''Federal Information Resources Management Regulations'' (FIRMR), Part 201-9, ''Creation, Maintenance, and Use of Records,'' and regulation issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter XII, Subchapter B, ''Records Management,'' require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA's General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 2, contains ''NRC's Comprehensive Records Disposition Schedule,'' and the original authorized approved citation numbers issued by NARA. Rev. 2 totally reorganizes the records schedules from a functional arrangement to an arrangement by the host office. A subject index and a conversion table have also been developed for the NRC schedules to allow staff to identify the new schedule numbers easily and to improve their ability to locate applicable schedules

  13. Developing an Innovative Customer Relationship Management Model for Better Health Examination Service

    Directory of Open Access Journals (Sweden)

    Lyu JrJung

    2014-11-01

    Full Text Available People emphasize on their own health and wish to know more about their conditions. Chronic diseases now take up to 50 percent of top 10 causes of death. As a result, the health-care industry has emerged and kept thriving. This work adopts an innovative customer-oriented business model since most clients are proactive and spontaneous in taking the “distinguished” health examination programs. We adopt the soft system dynamics methodology (SSDM to develop and to evaluate the steps of introducing customer relationship management model into a case health examination organization. Quantitative results are also presented for a case physical examination center and to assess the improved efficiency. The case study shows that the procedures developed here could provide a better service.

  14. Fears of Children in the United States: An Examination of the American Fear Survey Schedule with 20 New Contemporary Fear Items

    Science.gov (United States)

    Burnham, Joy J.

    2005-01-01

    Twenty contemporary fears (e.g., terrorist attacks, drive-by shootings, having to fight in a war) were added to E. Gullone and N. J. King's (1992) Australian Fear Survey Schedule for Children-II for use in the United States. The revised survey, the American Fear Survey Schedule for Children (J. J. Burnham, 1995), was investigated. The component…

  15. Integrating Preventive Maintenance Scheduling As Probability Machine Failure And Batch Production Scheduling

    Directory of Open Access Journals (Sweden)

    Zahedi Zahedi

    2016-06-01

    Full Text Available This paper discusses integrated model of batch production scheduling and machine maintenance scheduling. Batch production scheduling uses minimize total actual flow time criteria and machine maintenance scheduling uses the probability of machine failure based on Weibull distribution. The model assumed no nonconforming parts in a planning horizon. The model shows an increase in the number of the batch (length of production run up to a certain limit will minimize the total actual flow time. Meanwhile, an increase in the length of production run will implicate an increase in the number of PM. An example was given to show how the model and algorithm work.

  16. An examination of sleep health, lifestyle and mental health in junior high school students.

    Science.gov (United States)

    Tanaka, Hideki; Taira, Kazuhiko; Arakawa, Masashi; Masuda, Atushi; Yamamoto, Yukari; Komoda, Yoko; Kadegaru, Hathuko; Shirakawa, Shuichiro

    2002-06-01

    The factors that influence sleep health and mental health in junior high school students' lifestyles was examined. The proportion of students who replied that they feel bad in the morning, and who do not have breakfast was significantly higher in poor sleepers. The proportion of students who regularly take exercise was significantly lower among poor sleepers. Compared with good sleepers, poor sleepers had a higher number of illnesses and their General Health Questionnaire score was worse. The study's results suggest that sleep health is closely related to both physical and mental health, and that habits such as exercise, and regular sleeping and eating, are important for maintaining and improving students' sleep health.

  17. Clinical Examination Component of Telemedicine, Telehealth, mHealth, and Connected Health Medical Practices.

    Science.gov (United States)

    Weinstein, Ronald S; Krupinski, Elizabeth A; Doarn, Charles R

    2018-05-01

    Telemedicine and telehealth are the practices of medicine at a distance. Performing the equivalent of a complete clinical examination by telemedicine would be unusual. However, components of a more traditional clinical examination are part of the telemedicine workup for specific conditions. Telemedicine clinical examinations are facilitated, and enhanced, through the integration of a class of medical devices referred to as telemedicine peripherals (eg, electronic stethoscopes, tele-ophthalmoscopes, video-otoscopes, and so forth). Direct-to-consumer telehealth is a rapidly expanding segment of the health care service industry. Copyright © 2018 Elsevier Inc. All rights reserved.

  18. NASA Schedule Management Handbook

    Science.gov (United States)

    2011-01-01

    The purpose of schedule management is to provide the framework for time-phasing, resource planning, coordination, and communicating the necessary tasks within a work effort. The intent is to improve schedule management by providing recommended concepts, processes, and techniques used within the Agency and private industry. The intended function of this handbook is two-fold: first, to provide guidance for meeting the scheduling requirements contained in NPR 7120.5, NASA Space Flight Program and Project Management Requirements, NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Requirements, NPR 7120.8, NASA Research and Technology Program and Project Management Requirements, and NPD 1000.5, Policy for NASA Acquisition. The second function is to describe the schedule management approach and the recommended best practices for carrying out this project control function. With regards to the above project management requirements documents, it should be noted that those space flight projects previously established and approved under the guidance of prior versions of NPR 7120.5 will continue to comply with those requirements until project completion has been achieved. This handbook will be updated as needed, to enhance efficient and effective schedule management across the Agency. It is acknowledged that most, if not all, external organizations participating in NASA programs/projects will have their own internal schedule management documents. Issues that arise from conflicting schedule guidance will be resolved on a case by case basis as contracts and partnering relationships are established. It is also acknowledged and understood that all projects are not the same and may require different levels of schedule visibility, scrutiny and control. Project type, value, and complexity are factors that typically dictate which schedule management practices should be employed.

  19. Middle School A/B Block and Traditional Scheduling: An Analysis of Math and Reading Performance by Race

    Science.gov (United States)

    Gill, Willie Wallicia Allen

    2011-01-01

    The purpose of this quantitative study was to examine whether a difference existed in the percentage performance of students earning a pass/advanced score on the Standards of Learning (SOL) Test in math and reading in Virginia's Region IV for schools using an A/B block schedule and those using a traditional schedule. The research also examined if…

  20. Outage scheduling and implementation

    International Nuclear Information System (INIS)

    Allison, J.E.; Segall, P.; Smith, R.R.

    1986-01-01

    Successful preparation and implementation of an outage schedule and completion of scheduled and emergent work within an identified critical path time frame is a result of careful coordination by Operations, Work Control, Maintenance, Engineering, Planning and Administration and others. At the Fast Flux Test Facility (FFTF) careful planning has been responsible for meeting all scheduled outage critical paths

  1. A unique, fast-forwards rotating schedule with 12-h long shifts prevents chronic sleep debt.

    Science.gov (United States)

    Fischer, Dorothee; Vetter, Céline; Oberlinner, Christoph; Wegener, Sven; Roenneberg, Till

    2016-01-01

    Sleep debt--together with circadian misalignment--is considered a central factor for adverse health outcomes associated with shift work. Here, we describe in detail sleep-wake behavior in a fast-forward rotating 12-h shift schedule, which involves at least 24 hours off after each shift and thus allows examining the role of immediate recovery after shift-specific sleep debt. Thirty-five participants at two chemical plants in Germany were chronotyped using the Munich ChronoType Questionnaire for Shift-Workers (MCTQ(Shift)) and wore actimeters throughout the two-week study period. From these actimetry recordings, we computed sleep and nap duration, social jetlag (a measure of circadian misalignment), and the daily timing of activity and sleep (center of gravity and mid-sleep, respectively). We observed that the long off-work periods between each shift create a fast alternation between shortened (mean ± standard deviation, 5h 17min ± 56min) and extended (8h 25min ± 72min) sleep episodes resulting in immanent reductions of sleep debt. Additionally, extensive napping of early chronotypes (up to 3 hours before the night shift) statistically compensated short sleep durations after the night shift. Partial rank correlations showed chronotype-dependent patterns of sleep and activity that were similar to those previously described in 8-h schedules; however, sleep before the day shift did not differ between chronotypes. Our findings indicate that schedules preventing a build-up of chronic sleep debt may reduce detrimental effects of shift work irrespective of shift duration. Prospective studies are needed to further elucidate the relationship between sleep, the circadian system, and health and safety hazards.

  2. Preoperative home-based physical therapy versus usual care to improve functional health of frail older adults scheduled for elective total hip arthroplasty: A pilot randomized controlled trial

    NARCIS (Netherlands)

    Oosting, E.; Jans, M.P.; Dronkers, J.J.; Naber, R.H.; Dronkers-Landman, C.M.; Appelman-De Vries, S.M.; Meeteren, N.L. van

    2012-01-01

    Preoperative home-based physical therapy versus usual care to improve functional health of frail older adults scheduled for elective total hip arthroplasty: a pilot randomized controlled trial. Objective: To investigate the feasibility and preliminary effectiveness of a home-based intensive exercise

  3. Nonstandard Work Schedules, Family Dynamics, and Mother-Child Interactions During Early Childhood.

    Science.gov (United States)

    Prickett, Kate C

    2018-03-01

    The rising number of parents who work nonstandard schedules has led to a growing body of research concerned with what this trend means for children. The negative outcomes for children of parents who work nonstandard schedules are thought to arise from the disruptions these schedules place on family life, and thus, the types of parenting that support their children's development, particularly when children are young. Using a nationally representative sample of two-parent families (Early Childhood Longitudinal Study-Birth cohort, n = 3,650), this study examined whether mothers' and their partners' nonstandard work schedules were associated with mothers' parenting when children were 2 and 4 years old. Structural equation models revealed that mothers' and their partners' nonstandard work schedules were associated with mothers' lower scores on measures of positive and involved parenting. These associations were mediated by fathers' lower levels of participation in cognitively supportive parenting and greater imbalance in cognitively supportive tasks conducted by mothers versus fathers.

  4. Examining levels, distribution and correlates of health insurance coverage in Kenya.

    Science.gov (United States)

    Kazungu, Jacob S; Barasa, Edwine W

    2017-09-01

    To examine the levels, inequalities and factors associated with health insurance coverage in Kenya. We analysed secondary data from the Kenya Demographic and Health Survey (KDHS) conducted in 2009 and 2014. We examined the level of health insurance coverage overall, and by type, using an asset index to categorise households into five socio-economic quintiles with quintile 5 (Q5) being the richest and quintile 1 (Q1) being the poorest. The high-low ratio (Q5/Q1 ratio), concentration curve and concentration index (CIX) were employed to assess inequalities in health insurance coverage, and logistic regression to examine correlates of health insurance coverage. Overall health insurance coverage increased from 8.17% to 19.59% between 2009 and 2014. There was high inequality in overall health insurance coverage, even though this inequality decreased between 2009 (Q5/Q1 ratio of 31.21, CIX = 0.61, 95% CI 0.52-0.0.71) and 2014 (Q5/Q1 ratio 12.34, CIX = 0.49, 95% CI 0.45-0.52). Individuals that were older, employed in the formal sector; married, exposed to media; and male, belonged to a small household, had a chronic disease and belonged to rich households, had increased odds of health insurance coverage. Health insurance coverage in Kenya remains low and is characterised by significant inequality. In a context where over 80% of the population is in the informal sector, and close to 50% live below the national poverty line, achieving high and equitable coverage levels with contributory and voluntary health insurance mechanism is problematic. Kenya should consider a universal, tax-funded mechanism that ensures revenues are equitably and efficiently collected, and everyone (including the poor and those in the informal sector) is covered. © 2017 The Authors. Tropical Medicine & International Health published by John Wiley & Sons Ltd.

  5. Project Schedule Simulation

    DEFF Research Database (Denmark)

    Mizouni, Rabeb; Lazarova-Molnar, Sanja

    2015-01-01

    overrun both their budget and time. To improve the quality of initial project plans, we show in this paper the importance of (1) reflecting features’ priorities/risk in task schedules and (2) considering uncertainties related to human factors in plan schedules. To make simulation tasks reflect features......’ priority as well as multimodal team allocation, enhanced project schedules (EPS), where remedial actions scenarios (RAS) are added, were introduced. They reflect potential schedule modifications in case of uncertainties and promote a dynamic sequencing of involved tasks rather than the static conventional...... this document as an instruction set. The electronic file of your paper will be formatted further at Journal of Software. Define all symbols used in the abstract. Do not cite references in the abstract. Do not delete the blank line immediately above the abstract; it sets the footnote at the bottom of this column....

  6. Prioritizing sleep for healthy work schedules

    OpenAIRE

    Takahashi Masaya

    2012-01-01

    Abstract Good sleep is advantageous to the quality of life. Sleep-related benefits are particularly helpful for the working class, since poor or inadequate amounts of sleep degrade work productivity and overall health. This review paper explores the essential role of sleep in healthy work schedules and primarily focuses on the timing of sleep in relation to the work period (that is, before, during and after work). Data from laboratory, field and modeling studies indicate that consistent amoun...

  7. Examining the Pathways between Gratitude and Self-Rated Physical Health across Adulthood

    Science.gov (United States)

    Hill, Patrick L.; Allemand, Mathias; Roberts, Brent W.

    2012-01-01

    The current study examined whether dispositional gratitude predicts physical health among adults, and if so, whether this relationship occurs because grateful individuals lead healthier lives, either psychologically or physically. Specifically, we examined whether psychological health, healthy activities, and willingness to seek help for health concerns mediated the link between gratitude and self-reported physical health, as well as if these mediational pathways are moderated by age, in a broad sample of Swiss adults (N = 962, Mage = 52 years, age range: 19 to 84). Dispositional gratitude correlated positively with self-reported physical health, and this link was mediated by psychological health, healthy activities, and willingness to seek help for health concerns. However, the indirect effects for psychological health and healthy activities were stronger for older than younger adults. In other words, the mechanisms explaining why gratitude predicts health appear to differ across adulthood. PMID:23139438

  8. Influences on cocaine tolerance assessed under a multiple conjunctive schedule of reinforcement.

    Science.gov (United States)

    Yoon, Jin Ho; Branch, Marc N

    2009-11-01

    Under multiple schedules of reinforcement, previous research has generally observed tolerance to the rate-decreasing effects of cocaine that has been dependent on schedule-parameter size in the context of fixed-ratio (FR) schedules, but not under the context of fixed-interval (FI) schedules of reinforcement. The current experiment examined the effects of cocaine on key-pecking responses of White Carneau pigeons maintained under a three-component multiple conjunctive FI (10 s, 30 s, & 120 s) FR (5 responses) schedule of food presentation. Dose-effect curves representing the effects of presession cocaine on responding were assessed in the context of (1) acute administration of cocaine (2) chronic administration of cocaine and (3) daily administration of saline. Chronic administration of cocaine generally resulted in tolerance to the response-rate decreasing effects of cocaine, and that tolerance was generally independent of relative FI value, as measured by changes in ED50 values. Daily administration of saline decreased ED50 values to those observed when cocaine was administered acutely. The results show that adding a FR requirement to FI schedules is not sufficient to produce schedule-parameter-specific tolerance. Tolerance to cocaine was generally independent of FI-parameter under the present conjunctive schedules, indicating that a ratio requirement, per se, is not sufficient for tolerance to be dependent on FI parameter.

  9. Flexible work schedules, older workers, and retirement.

    Science.gov (United States)

    Siegenthaler, J K; Brenner, A M

    2000-01-01

    Older workers in the United States indicate that they would prefer flexible work arrangements rather than abrupt retirement, yet management has done very little to make this possible. A review of two bodies of literature from the late 1980s is presented: social science writings including sociological, gerontological, and economic literature, and business and management literature. There is a clash between the way jobs are traditionally scheduled and the needs of growing numbers of older workers. Workers continue to be subject to obstacles to phased retirement due to the structuring of health care and pension benefits, downsizing, organizational inflexibility, and "corporate culture." Thus, general views among social scientists regarding the desirability of flexible schedules toward retirement will not produce real changes unless management becomes committed to such changes and they are securely embedded in company policies.

  10. Gender Still Matters: Effects of Workplace Discrimination on Employment Schedules of Young Professionals

    Directory of Open Access Journals (Sweden)

    Gabriele Plickert

    2017-11-01

    Full Text Available The influx of women into the legal profession has significantly changed the landscape of legal practice. Women lawyers today no longer face the challenges to entering the legal profession they encountered thirty years ago. However, despite these advancements, research continues to demonstrate that there are still gender-based issues women have to face in the legal workplace. Among these issues to date are the difficulties in combining responsibilities of work with responsibilities of families and children that underpin women’s employment and earning disadvantages. Using survey data from a national representative U.S. panel study of lawyers, we examine how work schedules, comparing full-time to part-time work, vary by personal disposition and workplace characteristics. Drawing from prominent explanations of gender inequality in the legal profession, we focus on inquiries of commitment to work, performance, ideal worker expectations, practice settings, and job satisfaction among dimensions of workplace characteristics and examine their effects on women and men lawyers’ work schedules. Logistic regression results show that work schedules significantly vary by gender, parental role, and experience of workplace discrimination. We find that, although all parents experience types of discrimination, there are still major differences in work schedules between mothers and fathers. Our study adds to the gender debate of employment and organizations by examining quantitatively experiences of workplace discrimination.

  11. Scheduling theory, algorithms, and systems

    CERN Document Server

    Pinedo, Michael L

    2016-01-01

    This new edition of the well-established text Scheduling: Theory, Algorithms, and Systems provides an up-to-date coverage of important theoretical models in the scheduling literature as well as important scheduling problems that appear in the real world. The accompanying website includes supplementary material in the form of slide-shows from industry as well as movies that show actual implementations of scheduling systems. The main structure of the book, as per previous editions, consists of three parts. The first part focuses on deterministic scheduling and the related combinatorial problems. The second part covers probabilistic scheduling models; in this part it is assumed that processing times and other problem data are random and not known in advance. The third part deals with scheduling in practice; it covers heuristics that are popular with practitioners and discusses system design and implementation issues. All three parts of this new edition have been revamped, streamlined, and extended. The reference...

  12. Non-standard work schedules, gender, and parental stress

    Directory of Open Access Journals (Sweden)

    Mariona Lozano

    2016-02-01

    Full Text Available Background: Working non-standard hours changes the temporal structure of family life, constraining the time that family members spend with one another and threatening individuals' well-being. However, the empirical research on the link between stress and non-standard schedules has provided mixed results. Some studies have indicated that working non-standard hours is harmful whereas others have suggested that working atypical hours might facilitate the balance between family and work. Moreover, there is some evidence that the association between stress and non-standard employment has different implications for men and women. Objective: This paper examines the association between non-standard work schedules and stress among dual-earner couples with children. Two research questions are addressed. First, do predictability of the schedule and time flexibility moderate the link between non-standard work hours and stress? Second, do non-standard schedules affect men's and women's perceptions of stress differently? Methods: We use a sample of 1,932 working parents from the Canadian 2010 General Social Survey, which includes a time-use diary. A sequential logit regression analysis stratified by gender is employed to model two types of result. First, we estimate the odds of being stressed versus not being stressed. Second, for all respondents feeling stressed, we estimate the odds of experiencing high levels versus moderate levels of stress. Results: Our analysis shows that the link between non-standard working hours and perceived stress differs between mothers and fathers. First, fathers with non-standard schedules appear more likely to experience stress than those working standard hours, although the results are not significant. Among mothers, having a non-standard schedule is associated with a significantly lower risk of experiencing stress. Second, the analysis focusing on the mediating role of flexibility and predictability indicates that

  13. Relationships between Classroom Schedule Types and Performance on the Algebra I Criterion-Referenced Test

    Science.gov (United States)

    Murray, Gregory V.; Moyer-Packenham, Patricia S.

    2014-01-01

    One option for length of individual mathematics class periods is the schedule type selected for Algebra I classes. This study examined the relationship between student achievement, as indicated by Algebra I Criterion-Referenced Test scores, and the schedule type for Algebra I classes. Data obtained from the Utah State Office of Education included…

  14. Gain scheduling using the Youla parameterization

    DEFF Research Database (Denmark)

    Niemann, Hans Henrik; Stoustrup, Jakob

    1999-01-01

    Gain scheduling controllers are considered in this paper. The gain scheduling problem where the scheduling parameter vector cannot be measured directly, but needs to be estimated is considered. An estimation of the scheduling vector has been derived by using the Youla parameterization. The use...... in connection with H_inf gain scheduling controllers....

  15. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1982-07-01

    Effective January 1, 1982, NRC will institute records retention and disposal practices in accordance with the approved Comprehensive Records Disposition Schedule (CRDS). CRDS is comprised of NRC Schedules (NRCS) 1 to 4 which apply to the agency's program or substantive records and General Records Schedules (GRS) 1 to 22 which apply to housekeeping or facilitative records. The schedules are assembled functionally/organizationally to facilitate their use. Preceding the records descriptions and disposition instructions for both NRCS and GRS, there are brief statements on the organizational units which accumulate the records in each functional area, and other information regarding the schedules' applicability

  16. Joint Community Health Needs Assessments as a Path for Coordinating Community-Wide Health Improvement Efforts Between Hospitals and Local Health Departments.

    Science.gov (United States)

    Carlton, Erik L; Singh, Simone Rauscher

    2018-05-01

    To examine the association between hospital-local health department (LHD) collaboration around community health needs assessments (CHNAs) and hospital investment in community health. We combined 2015 National Association of County and City Health Officials (NACCHO) Forces of Change, 2013 NACCHO Profile, and 2014-2015 Area Health Resource File data to identify a sample of LHDs (n = 439) across the United States. We included data on hospitals' community benefit from their 2014 tax filings (Internal Revenue Service Form 990, Schedule H). We used bivariate and multivariate regression analyses to examine LHDs' involvement in hospitals' CHNAs and implementation strategies and the relationship with hospital investment in community health. The LHDs that collaborated with hospitals around CHNAs were significantly more likely to be involved in joint implementation planning activities than were those that did not. Importantly, LHD involvement in hospitals' implementation strategies was associated with greater hospital investment in community health improvement initiatives. Joint CHNAs may improve coordination of community-wide health improvement efforts between hospitals and LHDs and encourage hospital investment in community health improvement activities. Public Health Implications. Policies that strengthen LHD-hospital collaboration around the CHNA may enhance hospital investments in community health.

  17. Suitability and managerial implications of a Master Surgical Scheduling approach

    NARCIS (Netherlands)

    J.M. van Oostrum (Jeroen); E. Bredenhoff (Eelco); E.W. Hans (Erwin)

    2010-01-01

    textabstractAbstract: Operating room (OR) planning and scheduling is a popular and challenging subject within the operational research applied to health services research (ORAHS). However, the impact in practice is very limited. The organization and culture of a hospital and the inherent

  18. Self-Reported Recovery from 2-Week 12-Hour Shift Work Schedules: A 14-Day Follow-Up

    NARCIS (Netherlands)

    Merkus, S.L.; Holte, K.A.; Huysmans, M.A.; van de Ven, P.M.; van Mechelen, W.; van der Beek, A.J.

    2015-01-01

    Background Recovery from fatigue is important in maintaining night workers' health. This study compared the course of self-reported recovery after 2-week 12-hour schedules consisting of either night shifts or swing shifts (i.e., 7 night shifts followed by 7 day shifts) to such schedules consisting

  19. Incentive-compatible guaranteed renewable health insurance premiums.

    Science.gov (United States)

    Herring, Bradley; Pauly, Mark V

    2006-05-01

    Theoretical models of guaranteed renewable insurance display front-loaded premium schedules. Such schedules both cover lifetime total claims of low-risk and high-risk individuals and provide an incentive for those who remain low-risk to continue to purchase the policy. Questions have been raised of whether actual individual insurance markets in the US approximate the behavior predicted by these models, both because young consumers may not be able to "afford" front-loading and because insurers may behave strategically in ways that erode the value of protection against risk reclassification. In this paper, the optimal competitive age-based premium schedule for a benchmark guaranteed renewable health insurance policy is estimated using medical expenditure data. Several factors are shown to reduce the amount of front-loading necessary. Indeed, the resulting optimal premium path increases with age. Actual premium paths exhibited by purchasers of individual insurance are close to the optimal renewable schedule we estimate. Finally, consumer utility associated with the feature is examined.

  20. Fewer intensive care unit refusals and a higher capacity utilization by using a cyclic surgical case schedule

    NARCIS (Netherlands)

    van Houdenhoven, Mark; van Oostrum, Jeroen M.; Wullink, Gerhard; Hans, Elias W.; Hurink, Johann L.; Bakker, Jan; Kazemier, Geert

    Purpose: Mounting health care costs force hospital managers to maximize utilization of scarce resources and simultaneously improve access to hospital services. This article assesses the benefits of a cyclic case scheduling approach that exploits a master surgical schedule (MSS). An MSS maximizes

  1. Concurrent variable-interval variable-ratio schedules in a dynamic choice environment.

    Science.gov (United States)

    Bell, Matthew C; Baum, William M

    2017-11-01

    Most studies of operant choice have focused on presenting subjects with a fixed pair of schedules across many experimental sessions. Using these methods, studies of concurrent variable- interval variable-ratio schedules helped to evaluate theories of choice. More recently, a growing literature has focused on dynamic choice behavior. Those dynamic choice studies have analyzed behavior on a number of different time scales using concurrent variable-interval schedules. Following the dynamic choice approach, the present experiment examined performance on concurrent variable-interval variable-ratio schedules in a rapidly changing environment. Our objectives were to compare performance on concurrent variable-interval variable-ratio schedules with extant data on concurrent variable-interval variable-interval schedules using a dynamic choice procedure and to extend earlier work on concurrent variable-interval variable-ratio schedules. We analyzed performances at different time scales, finding strong similarities between concurrent variable-interval variable-interval and concurrent variable-interval variable- ratio performance within dynamic choice procedures. Time-based measures revealed almost identical performance in the two procedures compared with response-based measures, supporting the view that choice is best understood as time allocation. Performance at the smaller time scale of visits accorded with the tendency seen in earlier research toward developing a pattern of strong preference for and long visits to the richer alternative paired with brief "samples" at the leaner alternative ("fix and sample"). © 2017 Society for the Experimental Analysis of Behavior.

  2. It Is Not Just about the Schedule: Key Factors in Effective Reference Desk Scheduling and Management

    Science.gov (United States)

    Sciammarella, Susan; Fernandes, Maria Isabel; McKay, Devin

    2008-01-01

    Reference desk scheduling is one of the most challenging tasks in the organizational structure of an academic library. The ability to turn this challenge into a workable and effective function lies with the scheduler and indirectly the cooperation of all librarians scheduled for reference desk service. It is the scheduler's sensitivity to such…

  3. Suitability and managerial implications of a Master Surgical Scheduling approach

    NARCIS (Netherlands)

    van Oostrum, Jeroen M.; Bredenhoff, Eelco; Bredenhoff, E.; Hans, Elias W.

    2010-01-01

    Operating room (OR) planning and scheduling is a popular and challenging subject within the operational research applied to health services research (ORAHS). However, the impact in practice is very limited. The organization and culture of a hospital and the inherent characteristics of its processes

  4. Approximating Preemptive Stochastic Scheduling

    OpenAIRE

    Megow Nicole; Vredeveld Tjark

    2009-01-01

    We present constant approximative policies for preemptive stochastic scheduling. We derive policies with a guaranteed performance ratio of 2 for scheduling jobs with release dates on identical parallel machines subject to minimizing the sum of weighted completion times. Our policies as well as their analysis apply also to the recently introduced more general model of stochastic online scheduling. The performance guarantee we give matches the best result known for the corresponding determinist...

  5. [Age- and sex-specific reference intervals for 10 health examination items: mega-data from a Japanese Health Service Association].

    Science.gov (United States)

    Suka, Machi; Yoshida, Katsumi; Kawai, Tadashi; Aoki, Yoshikazu; Yamane, Noriyuki; Yamauchi, Kuniaki

    2005-07-01

    To determine age- and sex-specific reference intervals for 10 health examination items in Japanese adults. Health examination data were accumulated from 24 different prefectural health service associations affiliated with the Japan Association of Health Service. Those who were non-smokers, drank less than 7 days/week, and had a body mass index of 18.5-24.9kg/m2 were sampled as a reference population (n = 737,538; 224,947 men and 512,591 women). After classified by age and sex, reference intervals for 10 health examination items (systolic blood pressure, diastolic blood pressure, total cholesterol, triglyceride, glucose, uric acid, AST, ALT, gamma-GT, and hemoglobin) were estimated using the parametric and nonparametric methods. In every item except for hemoglobin, men had higher reference intervals than women. Systolic blood pressure, total cholesterol, and glucose showed an upward trend in values with increasing age. Hemoglobin showed a downward trend in values with increasing age. Triglyceride, ALT, and gamma-GT reached a peak in middle age. Overall, parametric estimates showed narrower reference intervals than non-parametric estimates. Reference intervals vary with age and sex. Age- and sex-specific reference intervals may contribute to better assessment of health examination data.

  6. Schedules of Controlled Substances: Temporary Placement of ortho-Fluorofentanyl, Tetrahydrofuranyl Fentanyl, and Methoxyacetyl Fentanyl Into Schedule I. Temporary amendment; temporary scheduling order.

    Science.gov (United States)

    2017-10-26

    The Administrator of the Drug Enforcement Administration is issuing this temporary scheduling order to schedule the synthetic opioids, N-(2-fluorophenyl)-N-(1-phenethylpiperidin-4-yl)propionamide (ortho-fluorofentanyl or 2-fluorofentanyl), N-(1-phenethylpiperidin-4-yl)-N-phenyltetrahydrofuran-2-carboxamide (tetrahydrofuranyl fentanyl), and 2-methoxy-N-(1-phenethylpiperidin-4-yl)-N-phenylacetamide (methoxyacetyl fentanyl), into Schedule I. This action is based on a finding by the Administrator that the placement of ortho-fluorofentanyl, tetrahydrofuranyl fentanyl, and methoxyacetyl fentanyl into Schedule I of the Controlled Substances Act is necessary to avoid an imminent hazard to the public safety. As a result of this order, the regulatory controls and administrative, civil, and criminal sanctions applicable to Schedule I controlled substances will be imposed on persons who handle (manufacture, distribute, reverse distribute, import, export, engage in research, conduct instructional activities or chemical analysis, or possess), or propose to handle, ortho-fluorofentanyl, tetrahydrofuranyl fentanyl, and methoxyacetyl fentanyl.

  7. Non-participation in preventive child health examinations at the general practitioner in Denmark

    DEFF Research Database (Denmark)

    Søndergaard, Grethe; Biering-Sørensen, Sofie; Michelsen, Susan Ishøy

    2008-01-01

    Objective. To examine demographic and socioeconomic characteristics of parents and children in families not participating in preventive child health examinations at the general practitioner in a society with free and easy access to healthcare. Design. Population-covering register linkage study...... free and easy access to the GP, the utilization of preventive child health examinations is lower among the more deprived part of the population....

  8. Schedules of Controlled Substances: Placement of FDA-Approved Products of Oral Solutions Containing Dronabinol [(-)-delta-9-transtetrahydrocannabinol (delta-9-THC)] in Schedule II. Interim final rule, with request for comments.

    Science.gov (United States)

    2017-03-23

    On July 1, 2016, the U.S. Food and Drug Administration (FDA) approved a new drug application for Syndros, a drug product consisting of dronabinol [(-)-delta-9-trans-tetrahydrocannabinol (delta-9-THC)] oral solution. Thereafter, the Department of Health and Human Services (HHS) provided the Drug Enforcement Administration (DEA) with a scheduling recommendation that would result in Syndros (and other oral solutions containing dronabinol) being placed in schedule II of the Controlled Substances Act (CSA). In accordance with the CSA, as revised by the Improving Regulatory Transparency for New Medical Therapies Act, DEA is hereby issuing an interim final rule placing FDA-approved products of oral solutions containing dronabinol in schedule II of the CSA.

  9. An Online Scheduling Algorithm with Advance Reservation for Large-Scale Data Transfers

    Energy Technology Data Exchange (ETDEWEB)

    Balman, Mehmet; Kosar, Tevfik

    2010-05-20

    Scientific applications and experimental facilities generate massive data sets that need to be transferred to remote collaborating sites for sharing, processing, and long term storage. In order to support increasingly data-intensive science, next generation research networks have been deployed to provide high-speed on-demand data access between collaborating institutions. In this paper, we present a practical model for online data scheduling in which data movement operations are scheduled in advance for end-to-end high performance transfers. In our model, data scheduler interacts with reservation managers and data transfer nodes in order to reserve available bandwidth to guarantee completion of jobs that are accepted and confirmed to satisfy preferred time constraint given by the user. Our methodology improves current systems by allowing researchers and higher level meta-schedulers to use data placement as a service where theycan plan ahead and reserve the scheduler time in advance for their data movement operations. We have implemented our algorithm and examined possible techniques for incorporation into current reservation frameworks. Performance measurements confirm that the proposed algorithm is efficient and scalable.

  10. Revision of the occupational health examination form for radiation workers

    International Nuclear Information System (INIS)

    Liu Chang'an; Chen Erdong

    2005-01-01

    Objective: To revise the Occupational Health Examination Form for Radiation Workers, which is served as annex 3 of Management Regulations for Occupational Health Surveillance (Decree No.23 of Ministry of Health, P.R. China), so as to further improve and standardize the occupational health management for radiation workers. Methods: Based on corresponding laws, standards and general principles of occupational medicine. Results: The new version of the Form was established and passed auditing. Conclusion: The theoretical foundation, intention and methods of the revision process are briefly introduced. Requirements and necessary recommendations for implement the new Form are also described. (authors)

  11. Gender discrepancies in the outcomes of schedule control on overtime hours and income in Germany

    OpenAIRE

    Lott, Yvonne; Chung, Heejung

    2016-01-01

    Schedule control can have both positive – e.g., increased income – but also negative outcomes – e.g., increased overtime. Here our core interest is whether there are gender discrepancies in these outcomes. Given the different ways in which schedule control can be used, and perceived to be used by men and women, their outcomes are also expected to be different. This is examined using the German Socio-Economic Panel Study (2003-2011), and panel regression models. The results show that schedule ...

  12. Schedule-Aware Workflow Management Systems

    Science.gov (United States)

    Mans, Ronny S.; Russell, Nick C.; van der Aalst, Wil M. P.; Moleman, Arnold J.; Bakker, Piet J. M.

    Contemporary workflow management systems offer work-items to users through specific work-lists. Users select the work-items they will perform without having a specific schedule in mind. However, in many environments work needs to be scheduled and performed at particular times. For example, in hospitals many work-items are linked to appointments, e.g., a doctor cannot perform surgery without reserving an operating theater and making sure that the patient is present. One of the problems when applying workflow technology in such domains is the lack of calendar-based scheduling support. In this paper, we present an approach that supports the seamless integration of unscheduled (flow) and scheduled (schedule) tasks. Using CPN Tools we have developed a specification and simulation model for schedule-aware workflow management systems. Based on this a system has been realized that uses YAWL, Microsoft Exchange Server 2007, Outlook, and a dedicated scheduling service. The approach is illustrated using a real-life case study at the AMC hospital in the Netherlands. In addition, we elaborate on the experiences obtained when developing and implementing a system of this scale using formal techniques.

  13. Revisiting Symbiotic Job Scheduling

    OpenAIRE

    Eyerman , Stijn; Michaud , Pierre; Rogiest , Wouter

    2015-01-01

    International audience; —Symbiotic job scheduling exploits the fact that in a system with shared resources, the performance of jobs is impacted by the behavior of other co-running jobs. By coscheduling combinations of jobs that have low interference, the performance of a system can be increased. In this paper, we investigate the impact of using symbiotic job scheduling for increasing throughput. We find that even for a theoretically optimal scheduler, this impact is very low, despite the subs...

  14. When drugs in the same controlled substance schedule differ in real-world abuse, should they be differentiated in labeling?

    Science.gov (United States)

    Dasgupta, Nabarun; Henningfield, Jack E; Ertischek, Michelle D; Schnoll, Sidney H

    2011-12-01

    The prescription drugs regulated in the most restrictive controlled substance schedule for those with an approved therapeutic use vary widely in their real world risk of abuse and harm. Opioid analgesics have the highest rates of abuse, overdose death, drug abuse treatment needs and societal costs in comparison to other Schedule II drugs. Stimulants for attention-deficit/hyperactivity disorders (ADHD) account for substantially lower rates of abuse, harm, and public health impact. The scheduling of drugs is determined by the World Health Organization, the United States Food and Drug Administration, and other regulatory agencies, through a quasi-public process that relies heavily on pre-marketing studies that are conducted in highly controlled clinical settings. We propose that it is increasingly in the interest of science-based regulation and public health to recognize and communicate differences among drugs based on their real-world abuse and public health harm using surveillance data. Appropriate differentiation through labeling of drugs that will likely remain in the same schedule could provide powerful incentives for drug development and research, would aid prescriber/patient decision making by informing them of real differences across drugs within a schedule, and may also contribute to public health efforts to reduce drug abuse. There are risks of course, that include inadvertent perceptions that drugs labeled to be lower in risk are not taken as seriously as others in the same category. Challenges such as these, however, can be overcome and should not serve as barriers to objective communications regarding a drug's actual risks. Copyright © 2011 Elsevier Ireland Ltd. All rights reserved.

  15. SPANR planning and scheduling

    Science.gov (United States)

    Freund, Richard F.; Braun, Tracy D.; Kussow, Matthew; Godfrey, Michael; Koyama, Terry

    2001-07-01

    SPANR (Schedule, Plan, Assess Networked Resources) is (i) a pre-run, off-line planning and (ii) a runtime, just-in-time scheduling mechanism. It is designed to support primarily commercial applications in that it optimizes throughput rather than individual jobs (unless they have highest priority). Thus it is a tool for a commercial production manager to maximize total work. First the SPANR Planner is presented showing the ability to do predictive 'what-if' planning. It can answer such questions as, (i) what is the overall effect of acquiring new hardware or (ii) what would be the effect of a different scheduler. The ability of the SPANR Planner to formulate in advance tree-trimming strategies is useful in several commercial applications, such as electronic design or pharmaceutical simulations. The SPANR Planner is demonstrated using a variety of benchmarks. The SPANR Runtime Scheduler (RS) is briefly presented. The SPANR RS can provide benefit for several commercial applications, such as airframe design and financial applications. Finally a design is shown whereby SPANR can provide scheduling advice to most resource management systems.

  16. Self-scheduling with Microsoft Excel.

    Science.gov (United States)

    Irvin, S A; Brown, H N

    1999-01-01

    Excessive time was being spent by the emergency department (ED) staff, head nurse, and unit secretary on a complex 6-week manual self-scheduling system. This issue, plus inevitable errors and staff dissatisfaction, resulted in a manager-lead initiative to automate elements of the scheduling process using Microsoft Excel. The implementation of this initiative included: common coding of all 8-hour and 12-hour shifts, with each 4-hour period represented by a cell; the creation of a 6-week master schedule using the "count-if" function of Excel based on current staffing guidelines; staff time-off requests then entered by the department secretary; the head nurse, with staff input, then fine-tuned the schedule to provide even unit coverage. Outcomes of these changes included an increase in staff satisfaction, time saved by the head nurse, and staff work time saved because there was less arguing about the schedule. Ultimately, the automated self-scheduling method was expanded to the entire 700-bed hospital.

  17. A master surgical scheduling approach for cyclic scheduling in operating room departments

    NARCIS (Netherlands)

    van Oostrum, Jeroen M.; van Houdenhoven, M.; Hurink, Johann L.; Hans, Elias W.; Wullink, Gerhard; Kazemier, G.

    This paper addresses the problem of operating room (OR) scheduling at the tactical level of hospital planning and control. Hospitals repetitively construct operating room schedules, which is a time-consuming, tedious, and complex task. The stochasticity of the durations of surgical procedures

  18. Psychosocial aspects of work and health in the North Sea oil and gas industry. Pt. 5: offshore work/leave schedules: data analyses and review

    Energy Technology Data Exchange (ETDEWEB)

    Parkes, K.R.; Clark, M.J.

    1997-09-01

    The work described in this report draws on a variety of sources to examine the psychosocial implications of three-week offshore tours as compared with the more usual two-week tour duration. Little of the information currently available about the psychosocial environment offshore, and the mental and physical health of offshore employees, relates to personnel working three-week tours. The present study, intended as a preliminary exploration of responses to three-week offshore schedules, brings together the several different kinds of information. The report includes: A brief review of relevant literature; a comparison of different work/leave patterns in terms of the attitudes and preferences of offshore personnel (N=1462); Analysis of questionnaire data evaluating the reactions of offshore personnel (N=113) to plans to change from two-week to three-week tours; A pilot study of mood and sleep patterns among personnel working either a two-week or a three-week tour at the time of data collection; material from interviews with wives of offshore personnel, focusing on family issues associated with offshore employment, including work/leave cycles. (UK)

  19. Examining the Role of Anxiety and Apathy in Health Consumers' Intentions to Use Patient Health Portals for Personal Health Information Management

    Science.gov (United States)

    Torres, Carlos A.

    2011-01-01

    This study investigated college students' attitudes toward and intentions to use personal health portals (PHPs) for managing their personal health information using a survey method. The study also aimed to examine the roles electronic Personal Health Information Management (PHIM) anxiety and apathy play in influencing students' attitudes toward…

  20. Immunization Schedules for Adults

    Science.gov (United States)

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedule for Adults (19 Years of Age and ... diseases that can be prevented by vaccines . 2018 Immunization Schedule Recommended Vaccinations for Adults by Age and ...

  1. Instant Childhood Immunization Schedule

    Science.gov (United States)

    ... Recommendations Why Immunize? Vaccines: The Basics Instant Childhood Immunization Schedule Recommend on Facebook Tweet Share Compartir Get ... date. See Disclaimer for additional details. Based on Immunization Schedule for Children 0 through 6 Years of ...

  2. BIM-BASED SCHEDULING OF CONSTRUCTION

    DEFF Research Database (Denmark)

    Andersson, Niclas; Büchmann-Slorup, Rolf

    2010-01-01

    The potential of BIM is generally recognized in the construction industry, but the practical application of BIM for management purposes is, however, still limited among contractors. The objective of this study is to review the current scheduling process of construction in light of BIM...... and communicate. Scheduling on the detailed level, on the other hand, follows a stipulated approach to scheduling, i.e. the Last Planner System (LPS), which is characterized by involvement of all actors in the construction phase. Thus, the major challenge when implementing BIM-based scheduling is to improve...

  3. Cross-sectional study about primary health care professionals views on the inclusion of the vaccine against human papillomavirus in the vaccine schedules.

    Science.gov (United States)

    Pérez, M Reyes Oliver; Violeta, Victoria Bravo; Del Campo, Ana Vazquez; Ruiz, Cristina; Castaño, Sonia Yáñez; Conde, Laura P Pérez; López, Jesús S Jiménez

    2015-01-01

    Although the inclusion of the HPV vaccine has been registered in Spain since 2007, vaccination rates are lower than expected. The patients wish to be vaccinated is heavily influenced by information they have received from many source. The Knowledge of primary health care professionals affects the information provided to patients and is fundamental in the decision making. The aim of this study is to assess the opinions of primary health care professionals on the vaccine against HPV and their knowledge about HPV infection and its links to with gynecological and oropharyngeal cancer. Cross-sectional study. A 19-item survey was drawn up. It included questions on basic aspects of HPV infection and marketed vaccines, personal opinion about the inclusion in the immunization schedules and their level of prescription and recommendation to patients in their clinical practice. From October 2013 to December 2013, 607 surveys were distributed among 20 primary health centers affiliated to the University Hospital 12 de Octubre. The results were analyzed using SPSS statistical package. One hundred sixty four successfully completed surveys were obtained for analysis. 89 % of the professionals knew about the relationship between HPV infection and cervical cancer, 57.3 % did not know any of the serotypes against which vaccines are targeted; 40.4 % believed that there is insufficient data to support the commercialization of the vaccines. Of these, 65.7 % argue that there is no data of its long-term effectiveness, 13.4 % that there is no data as to its side effects, 13.4 % believed that the cost effectiveness is not worthwhile. There is a strong controversy among health professionals regarding the marketing and inclusion of HPV vaccine in immunization schedules. However, the knowledge of the primary care health professionals on key aspects of infection and vaccine protection are insufficient. The training of professionals in vaccination, cervical pathology and HPV infection

  4. 76 FR 60359 - Phytosanitary Treatments; Location of and Process for Updating Treatment Schedules; Technical...

    Science.gov (United States)

    2011-09-29

    ... supporting information and data, to the Animal and Plant Health Inspection Service, Plant Protection and... supporting information and data, to the Animal and Plant Health Inspection Service, Plant Protection and... that approved treatment schedules will instead be found in the Plant Protection and Quarantine...

  5. Working hours and depressive symptomatology among full-time employees: Results from the fourth Korean National Health and Nutrition Examination Survey (2007-2009).

    Science.gov (United States)

    Kim, Inah; Kim, Hyunjoo; Lim, Sinye; Lee, Mira; Bahk, Jinwook; June, Kyung Ja; Kim, Soyeon; Chang, Won Joon

    2013-09-01

    This study aimed to examine the distribution of working hours and the association between working hours and depressive symptomatology using representative data from a national, population-based survey. Data came from the fourth Korean National Health and Nutrition Examination Survey (2007-2009), which employed a systematic, stratified cluster-sampling method. We used logistic regression procedures to estimate the importance of weekly working hours as a predictor of depressive symptomatology. The prevalence of depressive symptomatology was 10.2%. The work week, which averaged 48.3 hours for the sample as a whole, was longer for men (49.8 hours) than women (45.3 hours), and 12.1% of respondents were engaged in shift work. In logistic regression analyses, compared to those working hours per week, the odds ratios (OR) of working hours as a predictor of depressive symptomatology were 1.19 [95% confidence interval (95% CI) 0.77-1.85] for those working 52-59 hours per week and 1.62 (95% CI 1.20-2.18) for those working ≥ 60 hours per week, after adjustment for demographic characteristics, health behaviors, socioeconomic status, employment status, and work schedules. It showed a positive dose-response relationship between working hours and depressive symptomatology (P = 0.0059). Working hours in Korea are long. There is an association between working hours and depressive symptomatology, and there seems be a trend in working hours and depressive symptomatology.

  6. [Factors Associated with Stress Check Attendance: Possible Effect of Timing of Annual Health Examination].

    Science.gov (United States)

    Ishimaru, Tomohiro; Hattori, Michihiro; Nagata, Masako; Kuwahara, Keisuke; Watanabe, Seiji; Mori, Koji

    2018-01-01

    The stress check program has been part of annual employees' health screening since 2015. Employees are recommended, but not obliged, to undergo the stress check offered. This study was designed to examine the factors associated with stress check attendance. A total of 31,156 Japanese employees who underwent an annual health examination and a stress check service at an Occupational Health Service Center in 2016 participated in this study. Data from the annual health examination and stress check service included stress check attendance, date of attendance (if implemented), gender, age, workplace industry, number of employees at the workplace, and tobacco and alcohol consumption. Data were analyzed using multiple logistic regression. The mean rate of stress check attendance was 90.8%. A higher rate of stress check attendance was associated with a lower duration from the annual health examination, age ≥30 years, construction and transport industry, and 50-999 employees at the workplace. A lower rate of stress check attendance was associated with medical and welfare industry and ≥1,000 employees at the workplace. These findings provide insights into developing strategies for improving the rate of stress check attendance. In particular, stress check attendance may improve if the stress check service and annual health examination are conducted simultaneously.

  7. The impact of a scheduling change on ninth grade high school performance on biology benchmark exams and the California Standards Test

    Science.gov (United States)

    Leonardi, Marcelo

    The primary purpose of this study was to examine the impact of a scheduling change from a trimester 4x4 block schedule to a modified hybrid schedule on student achievement in ninth grade biology courses. This study examined the impact of the scheduling change on student achievement through teacher created benchmark assessments in Genetics, DNA, and Evolution and on the California Standardized Test in Biology. The secondary purpose of this study examined the ninth grade biology teacher perceptions of ninth grade biology student achievement. Using a mixed methods research approach, data was collected both quantitatively and qualitatively as aligned to research questions. Quantitative methods included gathering data from departmental benchmark exams and California Standardized Test in Biology and conducting multiple analysis of covariance and analysis of covariance to determine significance differences. Qualitative methods include journal entries questions and focus group interviews. The results revealed a statistically significant increase in scores on both the DNA and Evolution benchmark exams. DNA and Evolution benchmark exams showed significant improvements from a change in scheduling format. The scheduling change was responsible for 1.5% of the increase in DNA benchmark scores and 2% of the increase in Evolution benchmark scores. The results revealed a statistically significant decrease in scores on the Genetics Benchmark exam as a result of the scheduling change. The scheduling change was responsible for 1% of the decrease in Genetics benchmark scores. The results also revealed a statistically significant increase in scores on the CST Biology exam. The scheduling change was responsible for .7% of the increase in CST Biology scores. Results of the focus group discussions indicated that all teachers preferred the modified hybrid schedule over the trimester schedule and that it improved student achievement.

  8. Network scheduling at Belene NPP construction site

    International Nuclear Information System (INIS)

    Matveev, A.

    2010-01-01

    Four types of schedules differing in the level of their detail are singled out to enhance the efficiency of Belene NPP Project implementation planning and monitoring: Level 1 Schedule–Summary Integrated Overall Time Schedule (SIOTS) is an appendix to EPC Contract. The main purpose of SIOTS is the large scale presentation of the current information on the Project implementation. Level 2 Schedule–Integrated Overall Time Schedule (IOTS)is the contract schedule for the Contractor (ASE JSC) and their subcontractors.The principal purpose of IOTS is the work progress planning and monitoring, the analysis of the effect of activities implementation upon the progress of the Project as a whole. IOTS is the reporting schedule at the Employer –Contractor level. Level 3 Schedules, Detail Time Schedules(DTS) are developed by those who actually perform the work and are agreed upon with Atomstroyexport JSC.The main purpose of DTS is the detail planning of Atomstroyexport subcontractor's activities. DTSare the reporting schedules at the level of Contractor-Subcontractor. Level 4 Schedules are the High Detail Time Schedules (HDTS), which are the day-to-day plans of work implementation and are developed, as a rule, for a week's time period.Each lower level time schedule details the activities of the higher level time schedule

  9. Web-Based Requesting and Scheduling Use of Facilities

    Science.gov (United States)

    Yeager, Carolyn M.

    2010-01-01

    Automated User's Training Operations Facility Utilization Request (AutoFUR) is prototype software that administers a Web-based system for requesting and allocating facilities and equipment for astronaut-training classes in conjunction with scheduling the classes. AutoFUR also has potential for similar use in such applications as scheduling flight-simulation equipment and instructors in commercial airplane-pilot training, managing preventive- maintenance facilities, and scheduling operating rooms, doctors, nurses, and medical equipment for surgery. Whereas requesting and allocation of facilities was previously a manual process that entailed examination of documents (including paper drawings) from different sources, AutoFUR partly automates the process and makes all of the relevant information available via the requester s computer. By use of AutoFUR, an instructor can fill out a facility-utilization request (FUR) form on line, consult the applicable flight manifest(s) to determine what equipment is needed and where it should be placed in the training facility, reserve the corresponding hardware listed in a training-hardware inventory database, search for alternative hardware if necessary, submit the FUR for processing, and cause paper forms to be printed. Auto-FUR also maintains a searchable archive of prior FURs.

  10. An examination of electronic health information privacy in older adults.

    Science.gov (United States)

    Le, Thai; Thompson, Hilaire; Demiris, George

    2013-01-01

    Older adults are the quickest growing demographic group and are key consumers of health services. As the United States health system transitions to electronic health records, it is important to understand older adult perceptions of privacy and security. We performed a secondary analysis of the Health Information National Trends Survey (2012, Cycle 1), to examine differences in perceptions of electronic health information privacy between older adults and the general population. We found differences in the level of importance placed on access to electronic health information (older adults placed greater emphasis on provider as opposed to personal access) and tendency to withhold information out of concerns for privacy and security (older adults were less likely to withhold information). We provide recommendations to alleviate some of these privacy concerns. This may facilitate greater use of electronic health communication between patient and provider, while promoting shared decision making.

  11. Parents' Family Time and Work Schedules: The Split-Shift Schedule in Spain

    NARCIS (Netherlands)

    Gracia, P.; Kalmijn, M.

    2016-01-01

    This study used data on couples from the 2003 Spanish Time Use Survey (N = 1,416) to analyze how work schedules are associated with family, couple, parent–child, and non-family leisure activities. Spain is clearly an interesting case for the institutionalized split-shift schedule, a long lunch break

  12. Nonstandard Maternal Work Schedules: Implications for African American Children’s Early Language Outcomes

    OpenAIRE

    Odom, Erika C.; Vernon-Feagans, Lynne; Crouter, Ann C.

    2013-01-01

    In this study, observed maternal positive engagement and perception of work-family spillover were examined as mediators of the association between maternal nonstandard work schedules and children’s expressive language outcomes in 231 African American families living in rural households. Mothers reported their work schedules when their child was 24 months of age and children’s expressive language development was assessed during a picture book task at 24 months and with a standardized assessmen...

  13. Using quantile regression to examine health care expenditures during the Great Recession.

    Science.gov (United States)

    Chen, Jie; Vargas-Bustamante, Arturo; Mortensen, Karoline; Thomas, Stephen B

    2014-04-01

    To examine the association between the Great Recession of 2007-2009 and health care expenditures along the health care spending distribution, with a focus on racial/ethnic disparities. Secondary data analyses of the Medical Expenditure Panel Survey (2005-2006 and 2008-2009). Quantile multivariate regressions are employed to measure the different associations between the economic recession of 2007-2009 and health care spending. Race/ethnicity and interaction terms between race/ethnicity and a recession indicator are controlled to examine whether minorities encountered disproportionately lower health spending during the economic recession. The Great Recession was significantly associated with reductions in health care expenditures at the 10th-50th percentiles of the distribution, but not at the 75th-90th percentiles. Racial and ethnic disparities were more substantial at the lower end of the health expenditure distribution; however, on average the reduction in expenditures was similar for all race/ethnic groups. The Great Recession was also positively associated with spending on emergency department visits. This study shows that the relationship between the Great Recession and health care spending varied along the health expenditure distribution. More variability was observed in the lower end of the health spending distribution compared to the higher end. © Health Research and Educational Trust.

  14. Schedule Control and Nursing Home Quality: Exploratory Evidence of a Psychosocial Predictor of Resident Care.

    Science.gov (United States)

    Hurtado, David A; Berkman, Lisa F; Buxton, Orfeu M; Okechukwu, Cassandra A

    2016-02-01

    To examine whether nursing homes' quality of care was predicted by schedule control (workers' ability to decide work hours), independently of other staffing characteristics. Prospective ecological study of 30 nursing homes in New England. Schedule control was self-reported via survey in 2011-2012 (N = 1,045). Quality measures included the prevalence of decline in activities of daily living, residents' weight loss, and pressure ulcers, indicators systematically linked with staffing characteristics. Outcomes data for 2012 were retrieved from Medicare.gov. Robust Linear Regressions showed that higher schedule control predicted lower prevalence of pressure ulcers (β = -0.51, p job satisfaction, and turnover intentions. Higher schedule control might enhance the planning and delivery of strategies to prevent or cure pressure ulcers. Further research is needed to identify potential causal mechanisms by which schedule control could improve quality of care. © The Author(s) 2014.

  15. Effect of additional brief counselling after periodic health examination on motivation for health behavior change [corrected].

    Science.gov (United States)

    Son, Ki Young; Lee, Cheol Min; Cho, BeLong; Lym, Youl Lee; Oh, Seung Won; Chung, Wonjoo; Lee, Jin-Seok; Park, DuShin; Kim, Han Suk

    2012-11-01

    This study was to evaluate the effect of additional brief counseling by a primary care physician on lifestyle modification of examinees after a periodic health examination. 1,000 participants of the 2007 Korean national health screening program were asked to note any variation in their health behavior after participating in the screening program. The degree of comprehensive motivation for lifestyle modification was assessed in terms of stages of health behavior change. We calculated odds ratio of positive change (enhanced stage of change) with multiple logistic regression analysis and age-adjusted proportion of positive changers. Of 989 respondents, 486 and 503 received the basic and additional programs, respectively. Additional group were more likely to be positive changer than basic group (adjusted OR 1.78; 95% CI 1.19-2.65), and this was more prominent in older age group (adjusted OR 2.38, 95% CI 1.23-4.58). The age-adjusted proportions of positive changers were 22.7% (95% CI, 17.9-28.3) and 36.2% (95% CI, 30.4-42.4) in the basic and additional groups, respectively (P behavior change after the health examination. Thus, such a consultation should be considered when designing a health-screening program.

  16. Analyzing scheduling in the food-processing industry

    DEFF Research Database (Denmark)

    Akkerman, Renzo; van Donk, Dirk Pieter

    2009-01-01

    Production scheduling has been widely studied in several research areas, resulting in a large number of methods, prescriptions, and approaches. However, the impact on scheduling practice seems relatively low. This is also the case in the food-processing industry, where industry......-specific characteristics induce specific and complex scheduling problems. Based on ideas about decomposition of the scheduling task and the production process, we develop an analysis methodology for scheduling problems in food processing. This combines an analysis of structural (technological) elements of the production...... process with an analysis of the tasks of the scheduler. This helps to understand, describe, and structure scheduling problems in food processing, and forms a basis for improving scheduling and applying methods developed in literature. It also helps in evaluating the organisational structures...

  17. Future aircraft networks and schedules

    Science.gov (United States)

    Shu, Yan

    2011-07-01

    Because of the importance of air transportation scheduling, the emergence of small aircraft and the vision of future fuel-efficient aircraft, this thesis has focused on the study of aircraft scheduling and network design involving multiple types of aircraft and flight services. It develops models and solution algorithms for the schedule design problem and analyzes the computational results. First, based on the current development of small aircraft and on-demand flight services, this thesis expands a business model for integrating on-demand flight services with the traditional scheduled flight services. This thesis proposes a three-step approach to the design of aircraft schedules and networks from scratch under the model. In the first step, both a frequency assignment model for scheduled flights that incorporates a passenger path choice model and a frequency assignment model for on-demand flights that incorporates a passenger mode choice model are created. In the second step, a rough fleet assignment model that determines a set of flight legs, each of which is assigned an aircraft type and a rough departure time is constructed. In the third step, a timetable model that determines an exact departure time for each flight leg is developed. Based on the models proposed in the three steps, this thesis creates schedule design instances that involve almost all the major airports and markets in the United States. The instances of the frequency assignment model created in this thesis are large-scale non-convex mixed-integer programming problems, and this dissertation develops an overall network structure and proposes iterative algorithms for solving these instances. The instances of both the rough fleet assignment model and the timetable model created in this thesis are large-scale mixed-integer programming problems, and this dissertation develops subproblem schemes for solving these instances. Based on these solution algorithms, this dissertation also presents

  18. Conception of Self-Construction Production Scheduling System

    Science.gov (United States)

    Xue, Hai; Zhang, Xuerui; Shimizu, Yasuhiro; Fujimura, Shigeru

    With the high speed innovation of information technology, many production scheduling systems have been developed. However, a lot of customization according to individual production environment is required, and then a large investment for development and maintenance is indispensable. Therefore now the direction to construct scheduling systems should be changed. The final objective of this research aims at developing a system which is built by it extracting the scheduling technique automatically through the daily production scheduling work, so that an investment will be reduced. This extraction mechanism should be applied for various production processes for the interoperability. Using the master information extracted by the system, production scheduling operators can be supported to accelerate the production scheduling work easily and accurately without any restriction of scheduling operations. By installing this extraction mechanism, it is easy to introduce scheduling system without a lot of expense for customization. In this paper, at first a model for expressing a scheduling problem is proposed. Then the guideline to extract the scheduling information and use the extracted information is shown and some applied functions are also proposed based on it.

  19. Enhancing elderly health examination effectiveness by adding physical function evaluations and interventions.

    Science.gov (United States)

    Li, Chia-Ming; Chang, Ching-I; Yu, Wen-Ruey; Yang, Winnie; Hsu, Chih-Cheng; Chen, Ching-Yu

    This study aimed to assess the benefit of adding physical function evaluations and interventions to routine elderly health examination. This is a Quasi-experimental controlled trial. 404 elderly adults (aged 70 and over) scoring 3-6 on the Canadian Study of Health and Aging Clinical Frailty Scale Chinese In-Person Interview Version (CSHA-CFS) in a 2012 annual elderly health examination were enrolled. Both the control and experimental groups received the routine annual health examination with the latter further provided with functional evaluations, exercise instruction, and nutrition education. 112 (84.8%) persons in the experiment group and 267 (98.2%) in the control group completed the study. CSHA-CFS performance of the experimental group was more likely to improve (odds ratio=9.50, 95% confidence interval (CI)=4.62-19.56) and less likely to deteriorate (OR=0.04, 95% CI=0.01-0.31) one year after intervention. Within the experimental group, Fried Frailty Index improvement percentage surpassed the deterioration percentage (29.5% vs. 0.9%, pPhysical Performance Battery increased from 10.0±1.6 to 11.6±0.9 (pexamination appeared to benefit the health of adults aged 70 years and older. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.

  20. Range Scheduling Aid (RSA)

    Science.gov (United States)

    Logan, J. R.; Pulvermacher, M. K.

    1991-01-01

    Range Scheduling Aid (RSA) is presented in the form of the viewgraphs. The following subject areas are covered: satellite control network; current and new approaches to range scheduling; MITRE tasking; RSA features; RSA display; constraint based analytic capability; RSA architecture; and RSA benefits.

  1. A heuristic model for risk and cost impacts of plant outage maintenance schedule

    International Nuclear Information System (INIS)

    Mohammad Hadi Hadavi, S.

    2009-01-01

    Cost and risk are two major competing criteria in maintenance optimization problems. If a plant is forced to shutdown because of accident or fear of accident happening, beside loss of revenue, it causes damage to the credibility and reputation of the business operation. In this paper a heuristic model for incorporating three compelling optimization criteria (i.e., risk, cost, and loss) into a single evaluation function is proposed. Such a model could be used in any evaluation engine of outage maintenance schedule optimizer. It is attempted to make the model realistic and to address the ongoing challenges facing a schedule planner in a simple and commonly understandable fashion. Two simple competing schedules for the NPP feedwater system are examined against the model. The results show that while the model successfully addresses the current challenges for outage maintenance optimization, it properly demonstrates the dynamics of schedule in regards to risk, cost, and losses endured by maintenance schedule, particularly when prolonged outage and lack of maintenance for equipments in need of urgent care are of concern.

  2. Immunization Schedules for Infants and Children

    Science.gov (United States)

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedule for Infants and Children (Birth through 6 ... any questions please talk to your doctor. 2018 Immunization Schedule Recommended Vaccinations for Infants and Children Schedule ...

  3. Examining the Relationship between Instructional Leadership and Organizational Health

    Science.gov (United States)

    Parlar, Hanifi; Cansoy, Ramazan

    2017-01-01

    The aim of this study was to examine the relationship between school administrators' instructional leadership behaviours, and organizational health of schools. The participants were 538 teachers working in elementary, middle and high schools located in the Umraniye district of Istanbul. The data was gathered through the "School Principals'…

  4. A Formal Product-Line Engineering Approach for Schedulers

    NARCIS (Netherlands)

    Orhan, Güner; Aksit, Mehmet; Rensink, Arend; Jololian, Leon; Robbins, David E.; Fernandes, Steven L.

    2017-01-01

    Scheduling techniques have been applied to a large category of software systems, such as, processor scheduling in operating systems, car scheduling in elevator systems, facility scheduling at airports, antenna scheduling in radar systems, scheduling of events, control signals and data in

  5. Robust and Flexible Scheduling with Evolutionary Computation

    DEFF Research Database (Denmark)

    Jensen, Mikkel T.

    Over the last ten years, there have been numerous applications of evolutionary algorithms to a variety of scheduling problems. Like most other research on heuristic scheduling, the primary aim of the research has been on deterministic formulations of the problems. This is in contrast to real world...... scheduling problems which are usually not deterministic. Usually at the time the schedule is made some information about the problem and processing environment is available, but this information is uncertain and likely to change during schedule execution. Changes frequently encountered in scheduling...... environments include machine breakdowns, uncertain processing times, workers getting sick, materials being delayed and the appearance of new jobs. These possible environmental changes mean that a schedule which was optimal for the information available at the time of scheduling can end up being highly...

  6. Ship routing and scheduling: the cart before the horse conjecture

    DEFF Research Database (Denmark)

    Psaraftis, Harilaos N.

    2017-01-01

    The literature on ship routing and scheduling has grown substantially over the last few decades, with many papers authored by top experts in this area and examining various versions of the problem. Many publication outlets have hosted these papers, with a broad variety of problem formulations, so...

  7. The development of KMRR schedule and progress control system (KSPCS) for the master schedule of KMRR project

    International Nuclear Information System (INIS)

    Choi, Chang Woong; Lee, Tae Joon; Kim, Joon Yun; Cho, Yun Ho; Hah, Jong Hyun

    1993-07-01

    This report was to development the computerized schedule and progress control system for the master schedule of KMRR project with ARTEMIS 7000/386 CM (Ver. 7.4.2.) based on project management theory (PERT/CPM, PDM, and S-curve). This system has been efficiently used for KMRR master schedule and will be utilized for the detail scheduling of KMRR project. (Author) 23 refs., 26 figs., 52 tabs

  8. The development of KMRR schedule and progress control system (KSPCS) for the master schedule of KMRR project

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Chang Woong; Lee, Tae Joon; Kim, Joon Yun; Cho, Yun Ho; Hah, Jong Hyun [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1993-07-01

    This report was to development the computerized schedule and progress control system for the master schedule of KMRR project with ARTEMIS 7000/386 CM (Ver. 7.4.2.) based on project management theory (PERT/CPM, PDM, and S-curve). This system has been efficiently used for KMRR master schedule and will be utilized for the detail scheduling of KMRR project. (Author) 23 refs., 26 figs., 52 tabs.

  9. 78 FR 21818 - Schedules of Controlled Substances: Placement of Methylone Into Schedule I

    Science.gov (United States)

    2013-04-12

    ..., methamphetamine, and MDMA, Schedule I and II substances. These effects included elevated body temperature... of reuptake of monoamines, and in vivo studies (microdialysis, locomotor activity, body temperature.... Yet another commenter claimed that Schedule I placement would ``cripple efforts at learning,'' make it...

  10. Decentralized Ground Staff Scheduling

    DEFF Research Database (Denmark)

    Sørensen, M. D.; Clausen, Jens

    2002-01-01

    scheduling is investigated. The airport terminal is divided into zones, where each zone consists of a set of stands geographically next to each other. Staff is assigned to work in only one zone and the staff scheduling is planned decentralized for each zone. The advantage of this approach is that the staff...... work in a smaller area of the terminal and thus spends less time walking between stands. When planning decentralized the allocation of stands to flights influences the staff scheduling since the workload in a zone depends on which flights are allocated to stands in the zone. Hence solving the problem...... depends on the actual stand allocation but also on the number of zones and the layout of these. A mathematical model of the problem is proposed, which integrates the stand allocation and the staff scheduling. A heuristic solution method is developed and applied on a real case from British Airways, London...

  11. Schedule control in Ling Ao nuclear power project

    International Nuclear Information System (INIS)

    Xie Ahai

    2007-01-01

    Ling Ao Nuclear Power Station (LANP) is first one built up by self-reliance in China with power capacity 990x2 MWe. The results of quality control, schedule control and cost control are satisfactory. The commercial operation days of Unit 1 and Unit 2 were 28th May 2002 and 8th Jan. 2003 respectively, which were 48 days and 66 days in advance of the project schedule. This paper presents the practices of self-reliance schedule control system in LANP. The paper includes 10 sections: schedule control system; targets of schedule control; schedule control at early stage of project; construction schedule; scheduling practice; Point curves; schedule control of design and procurement; a good practice of construction schedule control on site; commissioning and startup schedule; schedule control culture. Three figures are attached. The main contents of the self-reliance schedule control system are as follows: to draw up reasonable schedules and targets; to setup management mechanism and procedures; to organize powerful project management team; to establish close monitoring system; to provide timely progress reports and statistics information. Five kinds of schedule control targets are introduced, i.e. bar-chart schedule; milesones; Point curves; interface management; hydraulic test schedule of auxiliary piping loops; EMR/EMC/EESR issuance schedules. Six levels of bar-chart schedules were adopted in LANP, but the bar-chart schedules were not satisfactory for complicated erection condition on site, even using six levels of schedules. So a kind of Point curves was developed and their advantages are explained. Scheduling method of three elements: activity, duration, logic, which was adopted in LANP, is introduced. The duration of each piping activities in LANP level 2 project schedule was calculated based on the relevant working Point quantities. The analysis and adjustment of Point curves are illustrated, i.e. balance of monthly quantities; possible production in the peakload

  12. Minimizing pain during childhood vaccination injections: improving adherence to vaccination schedules

    Directory of Open Access Journals (Sweden)

    Eden LM

    2014-09-01

    Full Text Available Lacey M Eden, Janelle LB Macintosh, Karlen E Luthy, Renea L Beckstrand College of Nursing, Brigham Young University, Provo, UT, USA Abstract: Pain experienced in childhood can lead to long-term and psychologically detrimental effects. Unfortunately, the most common pain experienced in childhood is caused by vaccinations and may lead to non-adherence to the recommended vaccination schedule. As a result, it is the health care provider's responsibility to take measures to reduce vaccination pain; however, there are a plethora of pain relieving interventions during immunizations and it is unclear which interventions are most cost efficient, timely, and effective. Studies have been conducted to investigate the efficacy of different pain management interventions during vaccinations. This review evaluates various pain relieving interventions and provide health care providers age appropriate guidance on pain relieving interventions during vaccinations. Employment of these strategies may successfully reduce vaccination-associated pain in infants, children, and adolescents, and may improve compliance with the vaccination schedule. Keywords: immunization, intervention, effective, compliance

  13. Working time, health and safety a research synthesis paper

    OpenAIRE

    Tucker, Philip; Folkard, Simon

    2012-01-01

    Outlines contemporary trends, developments and effects with regard to different aspects of working time, such as hours of work and work schedules. Examines the impact of modern working time arrangements on workers' health, well-being and workplace safety. Argues that while long daily hours tend to be associated with acute effects of fatigue, long weekly hours tend to be associated both with acute effects of fatigue as well as chronic fatigue, generating long-term negative health effects. Look...

  14. Multiuser switched diversity scheduling schemes

    KAUST Repository

    Shaqfeh, Mohammad; Alnuweiri, Hussein M.; Alouini, Mohamed-Slim

    2012-01-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed, and ordered scheduling mechanism. The main idea behind these schemes is that slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we characterize the achievable rate region of multiuser switched diversity systems and compare it with the rate region of full feedback multiuser diversity systems. We propose also a novel proportional fair multiuser switched-based scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the feedback thresholds. We finally demonstrate by numerical examples that switched-diversity scheduling schemes operate within 0.3 bits/sec/Hz from the ultimate network capacity of full feedback systems in Rayleigh fading conditions. © 2012 IEEE.

  15. Multiuser switched diversity scheduling schemes

    KAUST Repository

    Shaqfeh, Mohammad

    2012-09-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed, and ordered scheduling mechanism. The main idea behind these schemes is that slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we characterize the achievable rate region of multiuser switched diversity systems and compare it with the rate region of full feedback multiuser diversity systems. We propose also a novel proportional fair multiuser switched-based scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the feedback thresholds. We finally demonstrate by numerical examples that switched-diversity scheduling schemes operate within 0.3 bits/sec/Hz from the ultimate network capacity of full feedback systems in Rayleigh fading conditions. © 2012 IEEE.

  16. NASA Instrument Cost/Schedule Model

    Science.gov (United States)

    Habib-Agahi, Hamid; Mrozinski, Joe; Fox, George

    2011-01-01

    NASA's Office of Independent Program and Cost Evaluation (IPCE) has established a number of initiatives to improve its cost and schedule estimating capabilities. 12One of these initiatives has resulted in the JPL developed NASA Instrument Cost Model. NICM is a cost and schedule estimator that contains: A system level cost estimation tool; a subsystem level cost estimation tool; a database of cost and technical parameters of over 140 previously flown remote sensing and in-situ instruments; a schedule estimator; a set of rules to estimate cost and schedule by life cycle phases (B/C/D); and a novel tool for developing joint probability distributions for cost and schedule risk (Joint Confidence Level (JCL)). This paper describes the development and use of NICM, including the data normalization processes, data mining methods (cluster analysis, principal components analysis, regression analysis and bootstrap cross validation), the estimating equations themselves and a demonstration of the NICM tool suite.

  17. Optimizing the Steel Plate Storage Yard Crane Scheduling Problem Using a Two Stage Planning/Scheduling Approach

    DEFF Research Database (Denmark)

    Hansen, Anders Dohn; Clausen, Jens

    This paper presents the Steel Plate Storage Yard Crane Scheduling Problem. The task is to generate a schedule for two gantry cranes sharing tracks. The schedule must comply with a number of constraints and at the same time be cost efficient. We propose some ideas for a two stage planning...

  18. The triangle scheduling problem

    NARCIS (Netherlands)

    Dürr, Christoph; Hanzálek, Zdeněk; Konrad, Christian; Seddik, Yasmina; Sitters, R.A.; Vásquez, Óscar C.; Woeginger, Gerhard

    2017-01-01

    This paper introduces a novel scheduling problem, where jobs occupy a triangular shape on the time line. This problem is motivated by scheduling jobs with different criticality levels. A measure is introduced, namely the binary tree ratio. It is shown that the Greedy algorithm solves the problem to

  19. A System for Automatically Generating Scheduling Heuristics

    Science.gov (United States)

    Morris, Robert

    1996-01-01

    The goal of this research is to improve the performance of automated schedulers by designing and implementing an algorithm by automatically generating heuristics by selecting a schedule. The particular application selected by applying this method solves the problem of scheduling telescope observations, and is called the Associate Principal Astronomer. The input to the APA scheduler is a set of observation requests submitted by one or more astronomers. Each observation request specifies an observation program as well as scheduling constraints and preferences associated with the program. The scheduler employs greedy heuristic search to synthesize a schedule that satisfies all hard constraints of the domain and achieves a good score with respect to soft constraints expressed as an objective function established by an astronomer-user.

  20. A preliminary analysis of the reactor-based plutonium disposition alternative deployment schedules

    International Nuclear Information System (INIS)

    Zurn, R.M.

    1997-09-01

    This paper discusses the preliminary analysis of the implementation schedules of the reactor-based plutonium disposition alternatives. These schedule analyses are a part of a larger process to examine the nine decision criteria used to determine the most appropriate method of disposing of U.S. surplus weapons plutonium. The preliminary analysis indicates that the mission durations for the reactor-based alternatives range from eleven years to eighteen years and the initial mission fuel assemblies containing surplus weapons-usable plutonium could be loaded into the reactors between nine and fourteen years after the Record of Decision

  1. Applying dynamic priority scheduling scheme to static systems of pinwheel task model in power-aware scheduling.

    Science.gov (United States)

    Seol, Ye-In; Kim, Young-Kuk

    2014-01-01

    Power-aware scheduling reduces CPU energy consumption in hard real-time systems through dynamic voltage scaling (DVS). In this paper, we deal with pinwheel task model which is known as static and predictable task model and could be applied to various embedded or ubiquitous systems. In pinwheel task model, each task's priority is static and its execution sequence could be predetermined. There have been many static approaches to power-aware scheduling in pinwheel task model. But, in this paper, we will show that the dynamic priority scheduling results in power-aware scheduling could be applied to pinwheel task model. This method is more effective than adopting the previous static priority scheduling methods in saving energy consumption and, for the system being still static, it is more tractable and applicable to small sized embedded or ubiquitous computing. Also, we introduce a novel power-aware scheduling algorithm which exploits all slacks under preemptive earliest-deadline first scheduling which is optimal in uniprocessor system. The dynamic priority method presented in this paper could be applied directly to static systems of pinwheel task model. The simulation results show that the proposed algorithm with the algorithmic complexity of O(n) reduces the energy consumption by 10-80% over the existing algorithms.

  2. A Regression Analysis of South Carolina Algebra I End-of-Course Exam Scores by Schedule Type

    Science.gov (United States)

    Smith, Dawn M.

    2017-01-01

    The purpose of this study was to examine the relationship between scheduling and first-year-high-school students' exam scores on the South Carolina Algebra I End-of-Course (EOC) assessment. The study compared existing empirical data from two southeastern high schools from the same school district using 4 X 4 block schedules from 2011-2014 and…

  3. A collaborative scheduling model for the supply-hub with multiple suppliers and multiple manufacturers.

    Science.gov (United States)

    Li, Guo; Lv, Fei; Guan, Xu

    2014-01-01

    This paper investigates a collaborative scheduling model in the assembly system, wherein multiple suppliers have to deliver their components to the multiple manufacturers under the operation of Supply-Hub. We first develop two different scenarios to examine the impact of Supply-Hub. One is that suppliers and manufacturers make their decisions separately, and the other is that the Supply-Hub makes joint decisions with collaborative scheduling. The results show that our scheduling model with the Supply-Hub is a NP-complete problem, therefore, we propose an auto-adapted differential evolution algorithm to solve this problem. Moreover, we illustrate that the performance of collaborative scheduling by the Supply-Hub is superior to separate decision made by each manufacturer and supplier. Furthermore, we also show that the algorithm proposed has good convergence and reliability, which can be applicable to more complicated supply chain environment.

  4. Artificial intelligence approaches to astronomical observation scheduling

    Science.gov (United States)

    Johnston, Mark D.; Miller, Glenn

    1988-01-01

    Automated scheduling will play an increasing role in future ground- and space-based observatory operations. Due to the complexity of the problem, artificial intelligence technology currently offers the greatest potential for the development of scheduling tools with sufficient power and flexibility to handle realistic scheduling situations. Summarized here are the main features of the observatory scheduling problem, how artificial intelligence (AI) techniques can be applied, and recent progress in AI scheduling for Hubble Space Telescope.

  5. The effect of high and low assertiveness on locus of control and health problems.

    Science.gov (United States)

    Williams, J M; Stout, J K

    1985-03-01

    The effect of high and low assertiveness on locus of control and health problems was examined with 78 direct-service workers in mental health and mental retardation settings in northeastern Pennsylvania. The direct-service workers completed the Rathus (1973) Assertiveness Schedule, the Rotter (1966) Internal-External Locus of Control Scale, and a health-problems inventory. Highly assertive individuals were found to be more internally controlled and to experience fewer health problems than were individuals low in assertiveness.

  6. On the Integrated Job Scheduling and Constrained Network Routing Problem

    DEFF Research Database (Denmark)

    Gamst, Mette

    This paper examines the NP-hard problem of scheduling a number of jobs on a finite set of machines such that the overall profit of executed jobs is maximized. Each job demands a number of resources, which must be sent to the executing machine via constrained paths. Furthermore, two resource demand...

  7. Planning and scheduling - A schedule's performance

    International Nuclear Information System (INIS)

    Whitman, N.M.

    1993-01-01

    Planning and scheduling is a process whose time has come to PSI Energy. With an awareness of the challenges ahead, individuals must look for ways to enhance the corporate competitiveness. Working toward this goal means that each individual has to dedicate themselves to this more competitive corporate environment. Being competitive may be defined as the ability of each employee to add value to the corporation's economic well being. The timely and successful implementation of projects greatly enhances competitiveness. Those projects that do not do well often suffer from lack of proper execution - not for lack of talent or strategic vision. Projects are consumers of resources such as cash and people. They produce a return when completed and will generate a better return when properly completed utilizing proven project management techniques. Completing projects on time, within budget and meeting customer expectations is the way a corporation builds it's future. This paper offers suggestions on implementing planning and scheduling and provides a review of results in the form of management reports

  8. Alternative Work Schedules: Definitions

    Science.gov (United States)

    Journal of the College and University Personnel Association, 1977

    1977-01-01

    The term "alternative work schedules" encompasses any variation of the requirement that all permanent employees in an organization or one shift of employees adhere to the same five-day, seven-to-eight-hour schedule. This article defines staggered hours, flexible working hours (flexitour and gliding time), compressed work week, the task system, and…

  9. Contagious flexibility? A study on whether schedule flexibility facilitates work-life enrichment.

    Science.gov (United States)

    Pedersen, Vivi Bach; Jeppesen, Hans Jeppe

    2012-08-01

    Schedule flexibility defines an important generating resource for work-life enrichment; however, our knowledge about how such spillovers take place is limited. This multiple case study examines how workers from different working time contexts with varying levels of schedule flexibility experience work-life interplay. Given the adopted explorative design, it is important to interpret the findings in a tentative light. Nonetheless, the study offers important insight into work-life enrichment that may guide future research in this field. The findings indicate that schedule flexibility may act as a boundary-spanning resource owing to the agency potential it offers workers. Thus, it seemed that flexible schedule opportunities enabled workers to engage more fully in personal life activities, which in turn had a positive influence on their work involvement through positive affect. Such positive role engagements appeared, however, to be greatly determined by workers' boundary management and by time conditions of work and family. In conclusion, the major findings and limitation of the study are discussed against existing research and theory. © 2012 The Authors. Scandinavian Journal of Psychology © 2012 The Scandinavian Psychological Associations.

  10. Health and Turnover of Working Mothers after Childbirth via the Work-Family Interface: An Analysis across Time

    Science.gov (United States)

    Carlson, Dawn S.; Grzywacz, Joseph G.; Ferguson, Merideth; Hunter, Emily M.; Clinch, C. Randall; Arcury, Thomas A.

    2011-01-01

    This study examined organizational levers that impact work-family experiences, participant health, and subsequent turnover. Using a sample of 179 women returning to full-time work 4 months after childbirth, we examined the associations of 3 job resources (job security, skill discretion, and schedule control) with work-to-family enrichment and the…

  11. Race-Related Stress, Racial Identity Attitudes, and Mental Health among Black Women

    Science.gov (United States)

    Jones, Hollie L.; Cross, William E., Jr.; DeFour, Darlene C.

    2007-01-01

    This study examined whether racial identity attitudes moderate the relationship between racist stress events, racist stress appraisal, and mental health. One hundred eighteen African American and 144 self-identified Caribbean women completed the Cross Racial Identity Scale, the Schedule of Racist Events, the Rosenberg Self-Esteem Scale, and the…

  12. Development of Watch Schedule Using Rules Approach

    Science.gov (United States)

    Jurkevicius, Darius; Vasilecas, Olegas

    The software for schedule creation and optimization solves a difficult, important and practical problem. The proposed solution is an online employee portal where administrator users can create and manage watch schedules and employee requests. Each employee can login with his/her own account and see his/her assignments, manage requests, etc. Employees set as administrators can perform the employee scheduling online, manage requests, etc. This scheduling software allows users not only to see the initial and optimized watch schedule in a simple and understandable form, but also to create special rules and criteria and input their business. The system using rules automatically will generate watch schedule.

  13. Political ideologies and health-oriented beliefs and behaviors: an empirical examination of strategic issues.

    Science.gov (United States)

    Murrow, J J; Coulter, R L; Coulter, M K

    2000-01-01

    The area of health care has been called the most important political issue of the 1990s. Attitudes toward health care reform, increasing health costs, and defensive medical practices have been examined in the public press and by academicians. In addition, a substantial amount of research has been directed toward the improvement of individual personal health due to changes in personal health-related habits and behaviors. To date, there are relatively few studies which have attempted to examine the political tendencies of a nationwide sample of respondents as they relate to personal health-related beliefs and behaviors. This article explores the consumer's views on critical questions relating to health orientations and political tendencies. The results indicate a divergence between the political orientations of respondents and their beliefs and behaviors associated with health and wellness. Implications for policy-makers are discussed.

  14. Technology for planning and scheduling under complex constraints

    Science.gov (United States)

    Alguire, Karen M.; Pedro Gomes, Carla O.

    1997-02-01

    Within the context of law enforcement, several problems fall into the category of planning and scheduling under constraints. Examples include resource and personnel scheduling, and court scheduling. In the case of court scheduling, a schedule must be generated considering available resources, e.g., court rooms and personnel. Additionally, there are constraints on individual court cases, e.g., temporal and spatial, and between different cases, e.g., precedence. Finally, there are overall objectives that the schedule should satisfy such as timely processing of cases and optimal use of court facilities. Manually generating a schedule that satisfies all of the constraints is a very time consuming task. As the number of court cases and constraints increases, this becomes increasingly harder to handle without the assistance of automatic scheduling techniques. This paper describes artificial intelligence (AI) technology that has been used to develop several high performance scheduling applications including a military transportation scheduler, a military in-theater airlift scheduler, and a nuclear power plant outage scheduler. We discuss possible law enforcement applications where we feel the same technology could provide long-term benefits to law enforcement agencies and their operations personnel.

  15. 46 CFR 163.003-27 - Production tests and examination.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Production tests and examination. 163.003-27 Section 163... examination. (a) General. Each ladder produced under Coast Guard approval must be tested in accordance with... for effective monitoring throughout the production schedule. (e) Visual examination. The visual...

  16. 46 CFR 160.017-27 - Production tests and examination.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Production tests and examination. 160.017-27 Section 160... examination. (a) General. Each ladder manufactured under Coast Guard approval must be tested in accordance... for effective monitoring throughout the production schedule. (e) Visual examination. The visual...

  17. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1983-05-01

    Effective January 1, 1982, NRC will institute records retention and disposal practives in accordance with the approved Comprehensive Records Disposition Schedule (CRDS). CRDS is comprised of NRC Schedules (NRCS) 1 to 4 which apply to the agency's program or substantive records and General Records Schedules (GRS) 1 to 24 which apply to housekeeping or facilitative records. NRCS-I applies to records common to all or most NRC offices; NRCS-II applies to program records as found in the various offices of the Commission, Atomic Safety and Licensing Board Panel, and the Atomic Safety and Licensing Appeal Panel; NRCS-III applies to records accumulated by the Advisory Committee on Reactor Safeguards; and NRCS-IV applies to records accumulated in the various NRC offices under the Executive Director for Operations. The schedules are assembled functionally/organizationally to facilitate their use. Preceding the records descriptions and disposition instructions for both NRCS and GRS, there are brief statements on the organizational units which accumulate the records in each functional area, and other information regarding the schedules' applicability

  18. CMS multicore scheduling strategy

    International Nuclear Information System (INIS)

    Yzquierdo, Antonio Pérez-Calero; Hernández, Jose; Holzman, Burt; Majewski, Krista; McCrea, Alison

    2014-01-01

    In the next years, processor architectures based on much larger numbers of cores will be most likely the model to continue 'Moore's Law' style throughput gains. This not only results in many more jobs in parallel running the LHC Run 1 era monolithic applications, but also the memory requirements of these processes push the workernode architectures to the limit. One solution is parallelizing the application itself, through forking and memory sharing or through threaded frameworks. CMS is following all of these approaches and has a comprehensive strategy to schedule multicore jobs on the GRID based on the glideinWMS submission infrastructure. The main component of the scheduling strategy, a pilot-based model with dynamic partitioning of resources that allows the transition to multicore or whole-node scheduling without disallowing the use of single-core jobs, is described. This contribution also presents the experiences made with the proposed multicore scheduling schema and gives an outlook of further developments working towards the restart of the LHC in 2015.

  19. Health Examination by PET. (1) Cancer Examination

    International Nuclear Information System (INIS)

    Uno, Koichi

    2006-01-01

    Cancer examination by positron emission tomography (PET) started in Japan in 1994 and has been rapidly popularized. This paper describes author's experience of the examination in his hospital along the recent Japanese guideline for the PET cancer examination. Fluorodeoxyglucose (FDG) is intravenously injected at 3.7 (or 4.6, for diabetic patients) MBq/kg after 4-5 hr fasting and 40 min later, imaging is conducted with additional delayed scan at 2 hr to reduce the possible false positive. Image is taken by the equipment with PET-specific camera, of which quality assurance (QA) is maintained according to the guideline, and 3D image is constructed by the ordered subset expectation maximization method. Number of examinees during 4.5 years are 18,210 (M/F=9,735/8,475), and 236 (1.3%), together with use of other test measures like ultrasonography, computed tomography (CT), magnetic resonance imaging (MRI), biochemical marker and occult blood as well, are found to have cancer of thyroid, large bowel, lung, breast and others. The false negative rate by PET alone is 78/236 (33%) for cancer. PET examination has problems of image reading and specificity of organs, and tasks of informed consent, test cost, increased exchange of information and radiation exposure. However, PET cancer examination will be established as a routine diagnostic tool when the accumulated evidence of early cancer detection is shown useful for improving the survival rate and for reducing the medicare cost. (T.I.)

  20. Next Generation CANDU: Conceptual Design for a Short Construction Schedule

    International Nuclear Information System (INIS)

    Hopwood, Jerry M.; Love, Ian J.W.; Elgohary, Medhat; Fairclough, Neville

    2002-01-01

    Atomic Energy of Canada Ltd. (AECL) has very successful experience in implementing new construction methods at the Qinshan (Phase III) twin unit CANDU 6 plant in China. This paper examines the construction method that must be implemented during the conceptual design phase of a project if short construction schedules are to be met. A project schedule of 48 months has been developed for the nth unit of NG (Next Generation) CANDU with a 42 month construction period from 1. Concrete to In-Service. An overall construction strategy has been developed involving paralleling project activities that are normally conducted in series. Many parts of the plant will be fabricated as modules and be installed using heavy lift cranes. The Reactor Building (RB), being on the critical path, has been the focus of considerable assessment, looking at alternative ways of applying the construction strategy to this building. A construction method has been chosen which will result in excess of 80% of internal work being completed as modules or as very streamlined traditional construction. This method is being further evaluated as the detailed layout proceeds. Other areas of the plant have been integrated into the schedule and new construction methods are being applied to these so that further modularization and even greater paralleling of activities will be achieved. It is concluded that the optimized construction method is a requirement, which must be implemented through all phases of design to make a 42 month construction schedule a reality. If the construction methods are appropriately chosen, the schedule reductions achieved will make nuclear more competitive. (authors)

  1. Data analysis with the DIANA meta-scheduling approach

    International Nuclear Information System (INIS)

    Anjum, A; McClatchey, R; Willers, I

    2008-01-01

    The concepts, design and evaluation of the Data Intensive and Network Aware (DIANA) meta-scheduling approach for solving the challenges of data analysis being faced by CERN experiments are discussed in this paper. Our results suggest that data analysis can be made robust by employing fault tolerant and decentralized meta-scheduling algorithms supported in our DIANA meta-scheduler. The DIANA meta-scheduler supports data intensive bulk scheduling, is network aware and follows a policy centric meta-scheduling. In this paper, we demonstrate that a decentralized and dynamic meta-scheduling approach is an effective strategy to cope with increasing numbers of users, jobs and datasets. We present 'quality of service' related statistics for physics analysis through the application of a policy centric fair-share scheduling model. The DIANA meta-schedulers create a peer-to-peer hierarchy of schedulers to accomplish resource management that changes with evolving loads and is dynamic and adapts to the volatile nature of the resources

  2. Scheduling lessons learned from the Autonomous Power System

    Science.gov (United States)

    Ringer, Mark J.

    1992-01-01

    The Autonomous Power System (APS) project at NASA LeRC is designed to demonstrate the applications of integrated intelligent diagnosis, control, and scheduling techniques to space power distribution systems. The project consists of three elements: the Autonomous Power Expert System (APEX) for Fault Diagnosis, Isolation, and Recovery (FDIR); the Autonomous Intelligent Power Scheduler (AIPS) to efficiently assign activities start times and resources; and power hardware (Brassboard) to emulate a space-based power system. The AIPS scheduler was tested within the APS system. This scheduler is able to efficiently assign available power to the requesting activities and share this information with other software agents within the APS system in order to implement the generated schedule. The AIPS scheduler is also able to cooperatively recover from fault situations by rescheduling the affected loads on the Brassboard in conjunction with the APEX FDIR system. AIPS served as a learning tool and an initial scheduling testbed for the integration of FDIR and automated scheduling systems. Many lessons were learned from the AIPS scheduler and are now being integrated into a new scheduler called SCRAP (Scheduler for Continuous Resource Allocation and Planning). This paper will service three purposes: an overview of the AIPS implementation, lessons learned from the AIPS scheduler, and a brief section on how these lessons are being applied to the new SCRAP scheduler.

  3. Routing and Scheduling Optimization Model of Sea Transportation

    Science.gov (United States)

    barus, Mika debora br; asyrafy, Habib; nababan, Esther; mawengkang, Herman

    2018-01-01

    This paper examines the routing and scheduling optimization model of sea transportation. One of the issues discussed is about the transportation of ships carrying crude oil (tankers) which is distributed to many islands. The consideration is the cost of transportation which consists of travel costs and the cost of layover at the port. Crude oil to be distributed consists of several types. This paper develops routing and scheduling model taking into consideration some objective functions and constraints. The formulation of the mathematical model analyzed is to minimize costs based on the total distance visited by the tanker and minimize the cost of the ports. In order for the model of the problem to be more realistic and the cost calculated to be more appropriate then added a parameter that states the multiplier factor of cost increases as the charge of crude oil is filled.

  4. Optimization of Hierarchically Scheduled Heterogeneous Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Traian; Pop, Paul; Eles, Petru

    2005-01-01

    We present an approach to the analysis and optimization of heterogeneous distributed embedded systems. The systems are heterogeneous not only in terms of hardware components, but also in terms of communication protocols and scheduling policies. When several scheduling policies share a resource......, they are organized in a hierarchy. In this paper, we address design problems that are characteristic to such hierarchically scheduled systems: assignment of scheduling policies to tasks, mapping of tasks to hardware components, and the scheduling of the activities. We present algorithms for solving these problems....... Our heuristics are able to find schedulable implementations under limited resources, achieving an efficient utilization of the system. The developed algorithms are evaluated using extensive experiments and a real-life example....

  5. Sport Tournament Automated Scheduling System

    OpenAIRE

    Raof R. A. A; Sudin S.; Mahrom N.; Rosli A. N. C

    2018-01-01

    The organizer of sport events often facing problems such as wrong calculations of marks and scores, as well as difficult to create a good and reliable schedule. Most of the time, the issues about the level of integrity of committee members and also issues about errors made by human came into the picture. Therefore, the development of sport tournament automated scheduling system is proposed. The system will be able to automatically generate the tournament schedule as well as automatically calc...

  6. 40 CFR 141.702 - Sampling schedules.

    Science.gov (United States)

    2010-07-01

    ... serving at least 10,000 people must submit their sampling schedule for the initial round of source water... submitting the sampling schedule that EPA approves. (3) Systems serving fewer than 10,000 people must submit... analytical result for a scheduled sampling date due to equipment failure, loss of or damage to the sample...

  7. A Collaborative Scheduling Model for the Supply-Hub with Multiple Suppliers and Multiple Manufacturers

    Directory of Open Access Journals (Sweden)

    Guo Li

    2014-01-01

    Full Text Available This paper investigates a collaborative scheduling model in the assembly system, wherein multiple suppliers have to deliver their components to the multiple manufacturers under the operation of Supply-Hub. We first develop two different scenarios to examine the impact of Supply-Hub. One is that suppliers and manufacturers make their decisions separately, and the other is that the Supply-Hub makes joint decisions with collaborative scheduling. The results show that our scheduling model with the Supply-Hub is a NP-complete problem, therefore, we propose an auto-adapted differential evolution algorithm to solve this problem. Moreover, we illustrate that the performance of collaborative scheduling by the Supply-Hub is superior to separate decision made by each manufacturer and supplier. Furthermore, we also show that the algorithm proposed has good convergence and reliability, which can be applicable to more complicated supply chain environment.

  8. A Collaborative Scheduling Model for the Supply-Hub with Multiple Suppliers and Multiple Manufacturers

    Science.gov (United States)

    Lv, Fei; Guan, Xu

    2014-01-01

    This paper investigates a collaborative scheduling model in the assembly system, wherein multiple suppliers have to deliver their components to the multiple manufacturers under the operation of Supply-Hub. We first develop two different scenarios to examine the impact of Supply-Hub. One is that suppliers and manufacturers make their decisions separately, and the other is that the Supply-Hub makes joint decisions with collaborative scheduling. The results show that our scheduling model with the Supply-Hub is a NP-complete problem, therefore, we propose an auto-adapted differential evolution algorithm to solve this problem. Moreover, we illustrate that the performance of collaborative scheduling by the Supply-Hub is superior to separate decision made by each manufacturer and supplier. Furthermore, we also show that the algorithm proposed has good convergence and reliability, which can be applicable to more complicated supply chain environment. PMID:24892104

  9. Prevalence of α(+)-Thalassemia in the Scheduled Tribe and Scheduled Caste Populations of Damoh District in Madhya Pradesh, Central India.

    Science.gov (United States)

    Singh, Mendi P S S; Gupta, Rasik B; Yadav, Rajiv; Sharma, Ravendra K; Shanmugam, Rajasubramaniam

    2016-08-01

    This study was carried out to ascertain the allelic frequency of α(+)-thalassemia (α(+)-thal) in Scheduled caste and scheduled tribe populations of the Damoh district of Madhya Pradesh, India. Random blood samples of Scheduled tribe (267) and Scheduled caste (168), considering the family as a sampling unit, were analyzed for the presence of the -α(3.7) (rightward) (NG_000006.1: g.34164_37967del3804) and -α(4.2) (leftward) (AF221717) deletions. α(+)-Thal was significantly higher in the Scheduled tribals (77.9%) as compared to the scheduled caste population (9.0%). About 58.0% scheduled tribals carried at least one chromosome with the -α(3.7) deletion and 20.0% scheduled tribals carried the -α(4.2) deletion. Frequency for the -α(3.7) allele was 0.487 in the scheduled tribal populations in comparison to 0.021 in scheduled castes. Allelic frequency for -α(4.2) was 0.103 and 0.024, respectively, in the above communities. No Hardy-Weinberg equilibrium for α-thal gene (p population, indicating the presence of selection pressures in favor of α-thal mutation and adaptation.

  10. A Form 990 Schedule H conundrum: how much of your bad debt might be charity?

    Science.gov (United States)

    Bailey, Shari; Franklin, David; Hearle, Keith

    2010-04-01

    IRS Form 990 Schedule H requires hospitals to estimate the amount of bad debt expense attributable to patients eligible for charity under the hospital's charity care policy. Responses to Schedule H, Part III.A.3 open up the entire patient collection process to examination by the IRS, state officials, and the public. Using predictive analytics can help hospitals efficiently identify charity-eligible patients when answering Part III.A.3.

  11. Routine environmental monitoring schedule, calendar year 1995

    International Nuclear Information System (INIS)

    Schmidt, J.W.; Markes, B.M.; McKinney, S.M.

    1994-12-01

    This document provides Bechtel Hanford, Inc. (BHI) and Westinghouse Hanford Company (WHC) a schedule of monitoring and sampling routines for the Operational Environmental Monitoring (OEM) program during calendar year (CY) 1995. Every attempt will be made to consistently follow this schedule; any deviation from this schedule will be documented by an internal memorandum (DSI) explaining the reason for the deviation. The DSI will be issued by the scheduled performing organization and directed to Near-Field Monitoring. The survey frequencies for particular sites are determined by the technical judgment of Near-Field Monitoring and may depend on the site history, radiological status, use and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive wastes sites are scheduled to be surveyed at least annually. Any newly discovered wastes sites not documented by this schedule will be included in the revised schedule for CY 1995

  12. Application of linear scheduling method (LSM) for nuclear power plant (NPP) construction

    International Nuclear Information System (INIS)

    Kim, Woojoong; Ryu, Dongsoo; Jung, Youngsoo

    2014-01-01

    Highlights: • Mixed use of linear scheduling method with traditional CPM is suggested for NPP. • A methodology for selecting promising areas for LSM application is proposed. • A case-study is conducted to validate the proposed LSM selection methodology. • A case-study of reducing NPP construction duration by using LSM is introduced. - Abstract: According to a forecast, global energy demand is expected to increase by 56% from 2010 to 2040 (EIA, 2013). The nuclear power plant construction market is also growing with sharper competition. In nuclear power plant construction, scheduling is one of the most important functions due to its large size and complexity. Therefore, it is crucial to incorporate the ‘distinct characteristics of construction commodities and the complex characteristics of scheduling techniques’ (Jung and Woo, 2004) when selecting appropriate schedule control methods for nuclear power plant construction. However, among various types of construction scheduling techniques, the traditional critical path method (CPM) has been used most frequently in real-world practice. In this context, the purpose of this paper is to examine the viability and effectiveness of linear scheduling method (LSM) applications for specific areas in nuclear power plant construction. In order to identify the criteria for selecting scheduling techniques, the characteristics of CPM and LSM were compared and analyzed first through a literature review. Distinct characteristics of nuclear power plant construction were then explored by using a case project in order to develop a methodology to select effective areas of LSM application to nuclear power plant construction. Finally, promising areas for actual LSM application are suggested based on the proposed evaluation criteria and the case project. Findings and practical implications are discussed for further implementation

  13. Application of linear scheduling method (LSM) for nuclear power plant (NPP) construction

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Woojoong, E-mail: minidung@nate.com [Central Research Institute, Korea Hydro and Nuclear Power Co., Ltd, Daejeon 305-343 (Korea, Republic of); Ryu, Dongsoo, E-mail: energyboy@khnp.co.kr [Central Research Institute, Korea Hydro and Nuclear Power Co., Ltd, Daejeon 305-343 (Korea, Republic of); Jung, Youngsoo, E-mail: yjung97@mju.ac.kr [College of Architecture, Myongji University, Yongin 449-728 (Korea, Republic of)

    2014-04-01

    Highlights: • Mixed use of linear scheduling method with traditional CPM is suggested for NPP. • A methodology for selecting promising areas for LSM application is proposed. • A case-study is conducted to validate the proposed LSM selection methodology. • A case-study of reducing NPP construction duration by using LSM is introduced. - Abstract: According to a forecast, global energy demand is expected to increase by 56% from 2010 to 2040 (EIA, 2013). The nuclear power plant construction market is also growing with sharper competition. In nuclear power plant construction, scheduling is one of the most important functions due to its large size and complexity. Therefore, it is crucial to incorporate the ‘distinct characteristics of construction commodities and the complex characteristics of scheduling techniques’ (Jung and Woo, 2004) when selecting appropriate schedule control methods for nuclear power plant construction. However, among various types of construction scheduling techniques, the traditional critical path method (CPM) has been used most frequently in real-world practice. In this context, the purpose of this paper is to examine the viability and effectiveness of linear scheduling method (LSM) applications for specific areas in nuclear power plant construction. In order to identify the criteria for selecting scheduling techniques, the characteristics of CPM and LSM were compared and analyzed first through a literature review. Distinct characteristics of nuclear power plant construction were then explored by using a case project in order to develop a methodology to select effective areas of LSM application to nuclear power plant construction. Finally, promising areas for actual LSM application are suggested based on the proposed evaluation criteria and the case project. Findings and practical implications are discussed for further implementation.

  14. Effect of Climate Change on the Health of Rural Farmers in Offa ...

    African Journals Online (AJOL)

    The study examined the effect of climate change on the health of rural farmers in Offa, Kwara State. Nigeria. For the purpose of achieving the objectives of the study Ninety-eight (98) respondents were randomly sampled from ten wards. Data were collected through interview scheduled couple with a well structured ...

  15. EPA Sets Schedule to Improve Visibility in the Nation's Most Treasured Natural Areas

    Science.gov (United States)

    EPA issued a schedule to act on more than 40 state pollution reduction plans that will improve visibility in national parks and wilderness areas and protect public health from the damaging effects of the pollutants that cause regional haze.

  16. Examining the global health arena: strengths and weaknesses of a convention approach to global health challenges.

    Science.gov (United States)

    Haffeld, Just Balstad; Siem, Harald; Røttingen, John-Arne

    2010-01-01

    The article comprises a conceptual framework to analyze the strengths and weaknesses of a global health convention. The analyses are inspired by Lawrence Gostin's suggested Framework Convention on Global Health. The analytical model takes a starting-point in events tentatively following a logic sequence: Input (global health funding), Processes (coordination, cooperation, accountability, allocation of aid), Output (definition of basic survival needs), Outcome (access to health services), and Impact (health for all). It then examines to what degree binding international regulations can create order in such a sequence of events. We conclude that a global health convention could be an appropriate instrument to deal with some of the problems of global health. We also show that some of the tasks preceding a convention approach might be to muster international support for supra-national health regulations, negotiate compromises between existing stakeholders in the global health arena, and to utilize WHO as a platform for further discussions on a global health convention. © 2010 American Society of Law, Medicine & Ethics, Inc.

  17. Interactive Dynamic Mission Scheduling for ASCA

    Science.gov (United States)

    Antunes, A.; Nagase, F.; Isobe, T.

    The Japanese X-ray astronomy satellite ASCA (Advanced Satellite for Cosmology and Astrophysics) mission requires scheduling for each 6-month observation phase, further broken down into weekly schedules at a few minutes resolution. Two tools, SPIKE and NEEDLE, written in Lisp and C, use artificial intelligence (AI) techniques combined with a graphic user interface for fast creation and alteration of mission schedules. These programs consider viewing and satellite attitude constraints as well as observer-requested criteria and present an optimized set of solutions for review by the planner. Six-month schedules at 1 day resolution are created for an oversubscribed set of targets by the SPIKE software, originally written for HST and presently being adapted for EUVE, XTE and AXAF. The NEEDLE code creates weekly schedules at 1 min resolution using in-house orbital routines and creates output for processing by the command generation software. Schedule creation on both the long- and short-term scale is rapid, less than 1 day for long-term, and one hour for short-term.

  18. [The operational role of the occupational health physician in the assessment and management of health risks related to night risks].

    Science.gov (United States)

    Mucci, Nicola; Giorgi, Gabriele; Gonnelli, Irene Margherita; Garbarino, Sergio; Cupelli, Vincenzo; Arcangelil, Giulio

    2016-01-01

    The operational role of the occupational health physician in the assessment and management of health risks related to night work. Night work, in the last 30-40 years, has been extended to almost all areas of employment. The potential effects on workers' health--related to the disruption of circadian rhythms--are now well defined and studied in the Literature. All issues about the protection of safety and health for night workers are governed by the Italian Legislative Decree no. 66/2003 and subsequent amendments. The management of night work hasn't been included into the main Law on Occupational Safety and Health (Italian Legislative Decree no. 81/2008 and subsequent amendments) and a coordination between the two disciplines is desirable. The occupational health physician, as a global consultant for the protection of all health issues into a company, has to evaluate the potential effects of night work on health, both individually and as a group of workers. In this way, the physician may use either traditional tools (history, physical examination, blood tests) or innovative tools (questionnaires, health promotion programs, interventions on shift schedules). In the management of night work is useful to employ schedules that respect both psychophysical integrity and social welfare of workers and the needs of the production. The occupational health physician plays a significant role in information and training of workers, both individually and as a group of workers, and in the organization of health promotion programs (whit a voluntary participation by the workers).

  19. Examining relationships between multiple health risk behaviors, well-being, and productivity.

    Science.gov (United States)

    Evers, Kerry E; Castle, Patricia H; Prochaska, James O; Prochaska, Janice M

    2014-06-01

    Traditionally, the concept of health promotion has emphasized the reduction of health risk behaviors to reduce disease and impairment. Well-being research expands this focus to include positive constructs such as thriving, productivity, life-evaluation, and emotional and physical health. The objective of the present study was to examine the relationships between health risk behaviors and specific measures of individual well-being. Participants (N = 790) from 49 states completed a one-time online assessment that included the Life-Evaluation Index, Emotional and Physical Health Ladders, the Health Risk Intervention Assessment, and the Work Productivity and Activity Improvement Questionnaire for General Health. Life Evaluation and physical and emotional health were all inversely related to the number of health risk behaviors, with higher well-being scores associated with lower number of risk behaviors. Across the three Life Evaluation categories (Suffering, Struggling, and Thriving) the number of health risk behaviors decreased, productivity loss decreased, and emotional and physical health increased. The results add to previous research on how reducing multiple health risk behaviors can be combined with well-being, i.e., an emphasis on increasing life-evaluation, emotional and physical health, better functioning, and productivity.

  20. How Should School Districts Shape Teacher Salary Schedules? Linking School Performance to Pay Structure in Traditional Compensation Schemes

    Science.gov (United States)

    Grissom, Jason A.; Strunk, Katharine O.

    2012-01-01

    This study examines the relative distribution of salary schedule returns to experience for beginning and veteran teachers. We argue that districts are likely to benefit from structuring salary schedules with greater experience returns early in the teaching career. To test this hypothesis, we match salary data to school-level student performance…

  1. Further examination of predictors of turnover intention among mental health professionals.

    Science.gov (United States)

    Yanchus, N J; Periard, D; Osatuke, K

    2017-02-01

    WHAT IS KNOWN ON THE SUBJECT?: When mental health professionals leave organizations, detrimental effects on quality of patient care occur. Reasons for leaving include incivility, lack of autonomy, perceptions of unfair treatment and feeling psychologically unsafe at work. This paper sought to investigate additional reasons why mental health professionals intend to quit or to cognitively withdraw from their jobs. WHAT DOES THIS PAPER ADD TO EXISTING KNOWLEDGE?: Past research on this topic is limited in its scope and data. Mainly fragmented evidence is available about predictors of job satisfaction and turnover intention (i.e. different mental health occupations examined in separate studies). Only two existing studies that examined broader mental health provider groups were limited by including few workforce settings, small sample sizes and insufficiently rigorous statistical analyses. We examined four occupations (mental health nurses, social workers, psychologists and psychiatrists), each represented through a large sample in multiple settings, all within one large healthcare network with complex patients. Our contribution is finding additional predictors (supervisory support, emotional exhaustion) of job satisfaction/turnover intention. WHAT ARE THE IMPLICATIONS FOR PRACTICE?: Organizations can consider using culture change initiatives to increase civility at work; this includes leadership support and role modelling of workplace behaviours. Leaders should monitor staffing levels and high workloads to pre-empt emotional exhaustion, which predicts turnover. Hiring and training supervisors should involve not only technical expertise, but also 'soft skills' necessary for creating civil and supportive work environments. Leaders and managers should use employee feedback data (e.g. organizational surveys) to learn about the workplace environments, and address areas of employees' concern. Introduction Given the global shortage of mental health professionals, high turnover

  2. PRACTICAL IMPLICATIONS OF LOCATION-BASED SCHEDULING

    DEFF Research Database (Denmark)

    Andersson, Niclas; Christensen, Knud

    2007-01-01

    The traditional method for planning, scheduling and controlling activities and resources in construction projects is the CPM-scheduling, which has been the predominant scheduling method since its introduction in the late 1950s. Over the years, CPM has proven to be a very powerful technique...... that will be used in this study. LBS is a scheduling method that rests upon the theories of line-of-balance and which uses the graphic representation of a flowline chart. As such, LBS is adapted for planning and management of workflows and, thus, may provide a solution to the identified shortcomings of CPM. Even...

  3. Work schedule and client characteristics associated with workplace violence experience among nurses and midwives in sub-Saharan Africa.

    Science.gov (United States)

    El Ghaziri, Mazen; Zhu, Shijun; Lipscomb, Jane; Smith, Barbara A

    2014-01-01

    Violence against health care workers perpetrated by clients and/or their friends and family (Type II) is a growing problem that can severely impact health care delivery. We examined the prevalence of Type II workplace violence among nurses and midwives in sub-Saharan Africa and its association with work status, schedule, and client characteristics. Nurses and midwives (n = 712) completed an anonymous survey while attending nursing meetings. Generalized estimating equation models, accounting for clustering within residing countries, were employed. Participants who were exposed to risky client characteristics (aOR = 1.39-1.78, p worked more than 40 hours a week were more likely to have experienced Type II workplace violence (aOR = 1.72-2.15, p work hours. Copyright © 2014 Association of Nurses in AIDS Care. Published by Elsevier Inc. All rights reserved.

  4. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons

  5. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons.

  6. Schedule and staffing of a nuclear power project

    International Nuclear Information System (INIS)

    Polliart, A.J.; Csik, B.

    1977-01-01

    Establishment of construction schedule: a) preliminary construction schedule; b) PERT (Program Evaluation Review Techniques) analytical method; c) identify key milestone target dates; d) inter-action by participants and contribution to support revised construction schedule. - Construction schedule control: a) ability to update and modify construction schedule; b) alternate plans to circumvent restraints (problems); c) critical path activity-controls; d) continuous review and report system. - Updating construction site reports to include: 1) progress, 2) accomplishments, 3) potential problems and alternate plans; b) progress reports on related support services; c) total assessment of participating groups on schedule; d) information required by management for decisions. - Typical causes for delays in project schedule. (orig.) [de

  7. Online Scheduling in Manufacturing A Cumulative Delay Approach

    CERN Document Server

    Suwa, Haruhiko

    2013-01-01

    Online scheduling is recognized as the crucial decision-making process of production control at a phase of “being in production" according to the released shop floor schedule. Online scheduling can be also considered as one of key enablers to realize prompt capable-to-promise as well as available-to-promise to customers along with reducing production lead times under recent globalized competitive markets. Online Scheduling in Manufacturing introduces new approaches to online scheduling based on a concept of cumulative delay. The cumulative delay is regarded as consolidated information of uncertainties under a dynamic environment in manufacturing and can be collected constantly without much effort at any points in time during a schedule execution. In this approach, the cumulative delay of the schedule has the important role of a criterion for making a decision whether or not a schedule revision is carried out. The cumulative delay approach to trigger schedule revisions has the following capabilities for the ...

  8. Limited Preemptive Scheduling in Real-time Systems

    OpenAIRE

    Thekkilakattil, Abhilash

    2016-01-01

    Preemptive and non-preemptive scheduling paradigms typically introduce undesirable side effects when scheduling real-time tasks, mainly in the form of preemption overheads and blocking, that potentially compromise timeliness guarantees. The high preemption overheads in preemptive real-time scheduling may imply high resource utilization, often requiring significant over-provisioning, e.g., pessimistic Worst Case Execution Time (WCET) approximations. Non-preemptive scheduling, on the other hand...

  9. Rostering and Task Scheduling

    DEFF Research Database (Denmark)

    Dohn, Anders Høeg

    . The rostering process is non-trivial and especially when service is required around the clock, rostering may involve considerable effort from a designated planner. Therefore, in order to minimize costs and overstaffing, to maximize the utilization of available staff, and to ensure a high level of satisfaction...... as possible to the available staff, while respecting various requirements and rules and while including possible transportation time between tasks. This thesis presents a number of industrial applications in rostering and task scheduling. The applications exist within various contexts in health care....... Mathematical and logic-based models are presented for the problems considered. Novel components are added to existing models and the modeling decisions are justified. In one case, the model is solved by a simple, but efficient greedy construction heuristic. In the remaining cases, column generation is applied...

  10. Attitudes, beliefs, and practices regarding electronic nicotine delivery systems in patients scheduled for elective surgery.

    Science.gov (United States)

    Kadimpati, Sandeep; Nolan, Margaret; Warner, David O

    2015-01-01

    Smokers are at increased risk of postoperative complications. Electronic nicotine delivery systems (ENDS; or electronic cigarettes) could be a useful tool to reduce harm in the perioperative period. This pilot study examined the attitudes, beliefs, and practices of smokers scheduled for elective surgery regarding ENDS. This was a cross-sectional survey of current cigarette smokers who were evaluated in a preoperative clinic before elective surgery at Mayo Clinic. Measures included demographic characteristics, smoking history, 2 indices assessing the perception of how smoking affected health risks, ENDS use history, and 3 indices assessing interest in, perceived benefits of, and barriers to using ENDS in the perioperative period. Of the 112 smokers who completed the survey, 62 (55%) had tried ENDS and 24 (21%) reported current use. The most commonly stated reason for using ENDS was to quit smoking. Approximately 2 in 3 participants would be willing to use ENDS to help them reduce or eliminate perioperative cigarette use, and similar proportions perceived health benefits of doing so. Of the factors studied, only attempted to quit within the last year was significantly associated with increased interest in the perioperative use of ENDS (P=.03). Compared with participants who had tried ENDS (n=62), those who had never tried ENDS (n=50) had a significantly increased interest in the perioperative use of ENDS. A substantial proportion of patients scheduled for elective surgery had tried ENDS and would consider using ENDS to reduce perioperative use of cigarettes. Copyright © 2015 Mayo Foundation for Medical Education and Research. Published by Elsevier Inc. All rights reserved.

  11. Clinch River Breeder Reactor Plant Project: construction schedule

    International Nuclear Information System (INIS)

    Purcell, W.J.; Martin, E.M.; Shivley, J.M.

    1982-01-01

    The construction schedule for the Clinch River Breeder Reactor Plant and its evolution are described. The initial schedule basis, changes necessitated by the evaluation of the overall plant design, and constructability improvements that have been effected to assure adherence to the schedule are presented. The schedule structure and hierarchy are discussed, as are tools used to define, develop, and evaluate the schedule

  12. [Review of the 2016 Swiss immunization schedule and technology update for improving vaccine management].

    Science.gov (United States)

    Diana, Alessandro

    2016-05-11

    The 2016 immunization schedule published by the Swiss Federal Office of Public Health includes three new clauses: reimbursement of the additional Human Papillomavirus (HPV) vaccination in young males (11-26 years) as recommended by local canton programs, the end of franchise exemption for the measles, mumps and rubella (MMR) vaccination, and the creation of a new system of indemnities and moral compensation in the event of personal injury resulting from vaccinations. This article presents the main features of the 2016 immunization schedule with details of the technology available to physicians to improve vaccine management.

  13. Utilization Bound of Non-preemptive Fixed Priority Schedulers

    Science.gov (United States)

    Park, Moonju; Chae, Jinseok

    It is known that the schedulability of a non-preemptive task set with fixed priority can be determined in pseudo-polynomial time. However, since Rate Monotonic scheduling is not optimal for non-preemptive scheduling, the applicability of existing polynomial time tests that provide sufficient schedulability conditions, such as Liu and Layland's bound, is limited. This letter proposes a new sufficient condition for non-preemptive fixed priority scheduling that can be used for any fixed priority assignment scheme. It is also shown that the proposed schedulability test has a tighter utilization bound than existing test methods.

  14. Integrated Job Scheduling and Network Routing

    DEFF Research Database (Denmark)

    Gamst, Mette; Pisinger, David

    2013-01-01

    We consider an integrated job scheduling and network routing problem which appears in Grid Computing and production planning. The problem is to schedule a number of jobs at a finite set of machines, such that the overall profit of the executed jobs is maximized. Each job demands a number of resou...... indicate that the algorithm can be used as an actual scheduling algorithm in the Grid or as a tool for analyzing Grid performance when adding extra machines or jobs. © 2012 Wiley Periodicals, Inc.......We consider an integrated job scheduling and network routing problem which appears in Grid Computing and production planning. The problem is to schedule a number of jobs at a finite set of machines, such that the overall profit of the executed jobs is maximized. Each job demands a number...... of resources which must be sent to the executing machine through a network with limited capacity. A job cannot start before all of its resources have arrived at the machine. The scheduling problem is formulated as a Mixed Integer Program (MIP) and proved to be NP-hard. An exact solution approach using Dantzig...

  15. 42 CFR 415.172 - Physician fee schedule payment for services of teaching physicians.

    Science.gov (United States)

    2010-10-01

    ... teaching physicians. 415.172 Section 415.172 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES... PROVIDERS, SUPERVISING PHYSICIANS IN TEACHING SETTINGS, AND RESIDENTS IN CERTAIN SETTINGS Physician Services in Teaching Settings § 415.172 Physician fee schedule payment for services of teaching physicians. (a...

  16. Estimating exponential scheduling preferences

    DEFF Research Database (Denmark)

    Hjorth, Katrine; Börjesson, Maria; Engelson, Leonid

    2015-01-01

    of car drivers' route and mode choice under uncertain travel times. Our analysis exposes some important methodological issues related to complex non-linear scheduling models: One issue is identifying the point in time where the marginal utility of being at the destination becomes larger than the marginal......Different assumptions about travelers' scheduling preferences yield different measures of the cost of travel time variability. Only few forms of scheduling preferences provide non-trivial measures which are additive over links in transport networks where link travel times are arbitrarily...... utility of being at the origin. Another issue is that models with the exponential marginal utility formulation suffer from empirical identification problems. Though our results are not decisive, they partly support the constant-affine specification, in which the value of travel time variability...

  17. Group Elevator Peak Scheduling Based on Robust Optimization Model

    Directory of Open Access Journals (Sweden)

    ZHANG, J.

    2013-08-01

    Full Text Available Scheduling of Elevator Group Control System (EGCS is a typical combinatorial optimization problem. Uncertain group scheduling under peak traffic flows has become a research focus and difficulty recently. RO (Robust Optimization method is a novel and effective way to deal with uncertain scheduling problem. In this paper, a peak scheduling method based on RO model for multi-elevator system is proposed. The method is immune to the uncertainty of peak traffic flows, optimal scheduling is realized without getting exact numbers of each calling floor's waiting passengers. Specifically, energy-saving oriented multi-objective scheduling price is proposed, RO uncertain peak scheduling model is built to minimize the price. Because RO uncertain model could not be solved directly, RO uncertain model is transformed to RO certain model by elevator scheduling robust counterparts. Because solution space of elevator scheduling is enormous, to solve RO certain model in short time, ant colony solving algorithm for elevator scheduling is proposed. Based on the algorithm, optimal scheduling solutions are found quickly, and group elevators are scheduled according to the solutions. Simulation results show the method could improve scheduling performances effectively in peak pattern. Group elevators' efficient operation is realized by the RO scheduling method.

  18. NRC comprehensive records disposition schedule. Revision 3

    International Nuclear Information System (INIS)

    1998-02-01

    Title 44 US Code, ''Public Printing and Documents,'' regulations issued by the General Service Administration (GSA) in 41 CFR Chapter 101, Subchapter B, ''Management and Use of Information and Records,'' and regulations issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter 12, Subchapter B, ''Records Management,'' require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA's General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 3, contains ''NRC's Comprehensive Records Disposition Schedule,'' and the original authorized approved citation numbers issued by NARA. Rev. 3 incorporates NARA approved changes and additions to the NRC schedules that have been implemented since the last revision dated March, 1992, reflects recent organizational changes implemented at the NRC, and includes the latest version of NARA's General Records Schedule (dated August 1995)

  19. NRC comprehensive records disposition schedule. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    Title 44 US Code, ``Public Printing and Documents,`` regulations issued by the General Service Administration (GSA) in 41 CFR Chapter 101, Subchapter B, ``Management and Use of Information and Records,`` and regulations issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter 12, Subchapter B, ``Records Management,`` require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA`s General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 3, contains ``NRC`s Comprehensive Records Disposition Schedule,`` and the original authorized approved citation numbers issued by NARA. Rev. 3 incorporates NARA approved changes and additions to the NRC schedules that have been implemented since the last revision dated March, 1992, reflects recent organizational changes implemented at the NRC, and includes the latest version of NARA`s General Records Schedule (dated August 1995).

  20. National health and nutrition examination survey: plan and operations, 1999-2010.

    Science.gov (United States)

    Zipf, George; Chiappa, Michele; Porter, Kathryn S; Ostchega, Yechiam; Lewis, Brenda G; Dostal, Jennifer

    2013-08-01

    Background-Starting in 1999, the National Health and Nutrition Examination Survey (NHANES) became a continuous, ongoing annual survey of the noninstitutionalized civilian resident population of the United States. A continuous survey allowed content to change to meet emerging needs. Objective-This report describes how NHANES for 1999-2010 was designed and implemented. NHANES is a national survey designed to provide national estimates on various health-related topics. Methods-The survey used in-person face-to-face interviews and physical examinations for data collection. Approximately 5,000 people per year participated in NHANES. The 5,000 people surveyed each year are representative of the entire U.S. population. All material appearing in this report is in the public domain and may be reproduced or copied without permission; citation as to source, however, is appreciated.

  1. Cure Schedule for Stycast 2651/Catalyst 9.

    Energy Technology Data Exchange (ETDEWEB)

    Kropka, Jamie Michael [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); McCoy, John D. [New Mexico Inst. of Mining and Technology, Socorro, NM (United States)

    2017-11-01

    The Emerson & Cuming technical data sheet (TDS) for Stycast 2651/Catalyst 9 lists three alternate cure schedules for the material, each of which would result in a different state of reaction and different material properties. Here, a cure schedule that attains full reaction of the material is defined. The use of this cure schedule will eliminate variance in material properties due to changes in the cure state of the material, and the cure schedule will serve as the method to make material prior to characterizing properties. The following recommendation uses one of the schedules within the TDS and adds a “post cure” to obtain full reaction.

  2. Job shop scheduling problem with late work criterion

    Science.gov (United States)

    Piroozfard, Hamed; Wong, Kuan Yew

    2015-05-01

    Scheduling is considered as a key task in many industries, such as project based scheduling, crew scheduling, flight scheduling, machine scheduling, etc. In the machine scheduling area, the job shop scheduling problems are considered to be important and highly complex, in which they are characterized as NP-hard. The job shop scheduling problems with late work criterion and non-preemptive jobs are addressed in this paper. Late work criterion is a fairly new objective function. It is a qualitative measure and concerns with late parts of the jobs, unlike classical objective functions that are quantitative measures. In this work, simulated annealing was presented to solve the scheduling problem. In addition, operation based representation was used to encode the solution, and a neighbourhood search structure was employed to search for the new solutions. The case studies are Lawrence instances that were taken from the Operations Research Library. Computational results of this probabilistic meta-heuristic algorithm were compared with a conventional genetic algorithm, and a conclusion was made based on the algorithm and problem.

  3. Non use of health information kiosks examined in an information needs context.

    Science.gov (United States)

    Williams, Peter; Nicholas, David; Huntington, Paul

    2003-06-01

    Whilst great emphasis has rightly been placed on the increased availability and use of health information, little research has been undertaken into the non use of such material, particularly with regard to electronic sources. Computer transactional log data from health information touch screen kiosks, collected as part of an ongoing Department of Health-funded study being carried out by City University, showed that females in the 55-74 age group were particularly under-represented as users. To explore reasons for this, in-depth interviews were carried out with 13 non-kiosk-using, primary-care out-patients fitting this profile, at a surgery which had a kiosk that was being monitored. Subjects were interviewed at length about their information needs and information-seeking behaviour, to determine reasons (if any) they might have had for non-kiosk use. The study utilized an interview schedule and technique loosely based on the 'Sense-Making' methodology of Brenda Dervin (Talk Presented at the International Communication Association Annual Meeting, May 1983, Dallas, Texas, USA. Available from: http://communicationsbsohio-stateedu/sense-making/art/artdervin83html.). Findings elicited many factors accounting for non use of the system. The first and major source of information remained the doctor, with written or other sources only being consulted where recommended or provided. There was evidence that patients wanted little more than the minimum information or instructions required to deal with their condition. Many appeared unaware of the presence of the kiosk and others assumed either that it was not for patient use or that it would not serve their needs. The methodology proved itself, with certain caveats, to be an appropriate vehicle for this kind of exploratory work.

  4. Health Insurance Status as a Barrier to Ideal Cardiovascular Health for U.S. Adults: Data from the National Health and Nutrition Examination Survey (NHANES.

    Directory of Open Access Journals (Sweden)

    Michael A McClurkin

    Full Text Available Little is known about the association between cardiovascular (CV health and health insurance status. We hypothesized that U.S. adults without health insurance coverage would have a lower likelihood of ideal cardiovascular health.Using National Health and Nutrition Examination Survey (NHANES data from 2007-2010, we examined the relationship between health insurance status and ideal CV health in U.S. adults aged ≥19 years and <65 (N = 3304. Ideal CV health was defined by the American Heart Association (AHA as the absence of clinically manifested CV disease and the simultaneous presence of 6-7 "ideal" CV health factors and behaviors. Logistic regression modeling was used to determine the relationship between health insurance status and the odds of ideal CV health. Of the U.S. adult population, 5.4% attained ideal CV health, and 23.5% were without health insurance coverage. Those without health insurance coverage were more likely to be young (p<0.0001, male (p<0.0001, non-white (p<0.0001, with less than a high school degree (p<0.0001, have a poverty-to-income ratio less than 1 (p<0.0001 and unemployed (p<0.0001 compared to those with coverage. Lack of health insurance coverage was associated with a lower likelihood of ideal CV health; however, this relationship was attenuated by socioeconomic status.U.S. adults without health insurance coverage are less likely to have ideal CV health. Population-based strategies and interventions directed at the community-level may be one way to improve overall CV health and reach this at-risk group.

  5. MEDICAL STAFF SCHEDULING USING SIMULATED ANNEALING

    Directory of Open Access Journals (Sweden)

    Ladislav Rosocha

    2015-07-01

    Full Text Available Purpose: The efficiency of medical staff is a fundamental feature of healthcare facilities quality. Therefore the better implementation of their preferences into the scheduling problem might not only rise the work-life balance of doctors and nurses, but also may result into better patient care. This paper focuses on optimization of medical staff preferences considering the scheduling problem.Methodology/Approach: We propose a medical staff scheduling algorithm based on simulated annealing, a well-known method from statistical thermodynamics. We define hard constraints, which are linked to legal and working regulations, and minimize the violations of soft constraints, which are related to the quality of work, psychic, and work-life balance of staff.Findings: On a sample of 60 physicians and nurses from gynecology department we generated monthly schedules and optimized their preferences in terms of soft constraints. Our results indicate that the final value of objective function optimized by proposed algorithm is more than 18-times better in violations of soft constraints than initially generated random schedule that satisfied hard constraints.Research Limitation/implication: Even though the global optimality of final outcome is not guaranteed, desirable solutionwas obtained in reasonable time. Originality/Value of paper: We show that designed algorithm is able to successfully generate schedules regarding hard and soft constraints. Moreover, presented method is significantly faster than standard schedule generation and is able to effectively reschedule due to the local neighborhood search characteristics of simulated annealing.

  6. Practical principles in appointment scheduling

    NARCIS (Netherlands)

    Kuiper, A.; Mandjes, M.

    2015-01-01

    Appointment schedules aim at achieving a proper balance between the conflicting interests of the service provider and her clients: a primary objective of the service provider is to fully utilize her available time, whereas clients want to avoid excessive waiting times. Setting up schedules that

  7. Sport Tournament Automated Scheduling System

    Directory of Open Access Journals (Sweden)

    Raof R. A. A

    2018-01-01

    Full Text Available The organizer of sport events often facing problems such as wrong calculations of marks and scores, as well as difficult to create a good and reliable schedule. Most of the time, the issues about the level of integrity of committee members and also issues about errors made by human came into the picture. Therefore, the development of sport tournament automated scheduling system is proposed. The system will be able to automatically generate the tournament schedule as well as automatically calculating the scores of each tournament. The problem of scheduling the matches of a round robin and knock-out phase in a sport league are given focus. The problem is defined formally and the computational complexity is being noted. A solution algorithm is presented using a two-step approach. The first step is the creation of a tournament pattern and is based on known graph-theoretic method. The second one is an assignment problem and it is solved using a constraint based depth-first branch and bound procedure that assigns actual teams to numbers in the pattern. As a result, the scheduling process and knock down phase become easy for the tournament organizer and at the same time increasing the level of reliability.

  8. A model for generating master surgical schedules to allow cyclic scheduling in operating room departments

    NARCIS (Netherlands)

    van Oostrum, J.M.; van Houdenhoven, M.; Hurink, Johann L.; Hans, Elias W.; Wullink, Gerhard; Kazemier, G.

    2005-01-01

    This paper addresses the problem of operating room scheduling at the tactical level of hospital planning and control. Hospitals repetitively construct operating room schedules, which is a time consuming tedious and complex task. The stochasticity of the durations of surgical procedures complicates

  9. An Examination of Avoided Costs in Utah

    Energy Technology Data Exchange (ETDEWEB)

    Bolinger, Mark; Wiser, Ryan

    2005-01-07

    The Utah Wind Working Group (UWWG) believes there are currently opportunities to encourage wind power development in the state by seeking changes to the avoided cost tariff paid to qualifying facilities (QFs). These opportunities have arisen as a result of a recent renegotiation of Pacificorp's Schedule 37 tariff for wind QFs under 3 MW, as well as an ongoing examination of Pacificorp's Schedule 38 tariff for wind QFs larger than 3 MW. It is expected that decisions made regarding Schedule 38 will also impact Schedule 37. Through the Laboratory Technical Assistance Program (Lab TAP), the UWWG has requested (through the Utah Energy Office) that LBNL provide technical assistance in determining whether an alternative method of calculating avoided costs that has been officially adopted in Idaho would lead to higher QF payments in Utah, and to discuss the pros and cons of this method relative to the methodology recently adopted under Schedule 37 in Utah. To accomplish this scope of work, I begin by summarizing the current method of calculating avoided costs in Utah (per Schedule 37) and Idaho (the ''surrogate avoided resource'' or SAR method). I then compare the two methods both qualitatively and quantitatively. Next I present Pacificorp's four main objections to the use of the SAR method, and discuss the reasonableness of each objection. Finally, I conclude with a few other potential considerations that might add value to wind QFs in Utah.

  10. Scheduling nursing personnel on a microcomputer.

    Science.gov (United States)

    Liao, C J; Kao, C Y

    1997-01-01

    Suggests that with the shortage of nursing personnel, hospital administrators have to pay more attention to the needs of nurses to retain and recruit them. Also asserts that improving nurses' schedules is one of the most economic ways for the hospital administration to create a better working environment for nurses. Develops an algorithm for scheduling nursing personnel. Contrary to the current hospital approach, which schedules nurses on a person-by-person basis, the proposed algorithm constructs schedules on a day-by-day basis. The algorithm has inherent flexibility in handling a variety of possible constraints and goals, similar to other non-cyclical approaches. But, unlike most other non-cyclical approaches, it can also generate a quality schedule in a short time on a microcomputer. The algorithm was coded in C language and run on a microcomputer. The developed software is currently implemented at a leading hospital in Taiwan. The response to the initial implementation is quite promising.

  11. Vehicle and driver scheduling for public transit.

    Science.gov (United States)

    2009-08-01

    The problem of driver scheduling involves the construction of a legal set of shifts, including allowance : of overtime, which cover the blocks in a particular vehicle schedule. A shift is the work scheduled to be performed by : a driver in one day, w...

  12. A hybrid job-shop scheduling system

    Science.gov (United States)

    Hellingrath, Bernd; Robbach, Peter; Bayat-Sarmadi, Fahid; Marx, Andreas

    1992-01-01

    The intention of the scheduling system developed at the Fraunhofer-Institute for Material Flow and Logistics is the support of a scheduler working in a job-shop. Due to the existing requirements for a job-shop scheduling system the usage of flexible knowledge representation and processing techniques is necessary. Within this system the attempt was made to combine the advantages of symbolic AI-techniques with those of neural networks.

  13. [Estimating emergency hospital admissions to gauge short-term effects of air pollution: evaluation of health data quality].

    Science.gov (United States)

    Bois de Fer, Béatrice; Host, Sabine; Chardon, Benoît; Chatignoux, Edouard; Beaujouan, Laure; Brun-Ney, Dominique; Grémy, Isabelle

    2009-01-01

    The study of the short-term effects and health impact of air pollution is carrier out by the ERPURS regional surveillance program which utilizes hospitalization data obtained from the French hospital information system (PMSI) to determine these links. This system does not permit the distinction between emergency hospital admissions from scheduled ones, which cannot be related to short term changes in air pollution levels. This study examines how scheduled admissions affect the quality of the health indicators used to estimate air pollution effects. This indicator is compared to three new emergency hospitalisation indicators reconstructed based on data from the public hospitals in Paris, partly from the PMSI data and partly with data from an on-line emergency network that regroups all of the computerized emergency services. According to the pathology, scheduled admissions present a difficulty which affects the capacity to highlight the weakest risks with any precision.

  14. A customizable, scalable scheduling and reporting system.

    Science.gov (United States)

    Wood, Jody L; Whitman, Beverly J; Mackley, Lisa A; Armstrong, Robert; Shotto, Robert T

    2014-06-01

    Scheduling is essential for running a facility smoothly and for summarizing activities in use reports. The Penn State Hershey Clinical Simulation Center has developed a scheduling interface that uses off-the-shelf components, with customizations that adapt to each institution's data collection and reporting needs. The system is designed using programs within the Microsoft Office 2010 suite. Outlook provides the scheduling component, while the reporting is performed using Access or Excel. An account with a calendar is created for the main schedule, with separate resource accounts created for each room within the center. The Outlook appointment form's 2 default tabs are used, in addition to a customized third tab. The data are then copied from the calendar into either a database table or a spreadsheet, where the reports are generated.Incorporating this system into an institution-wide structure allows integration of personnel lists and potentially enables all users to check the schedule from their desktop. Outlook also has a Web-based application for viewing the basic schedule from outside the institution, although customized data cannot be accessed. The scheduling and reporting functions have been used for a year at the Penn State Hershey Clinical Simulation Center. The schedule has increased workflow efficiency, improved the quality of recorded information, and provided more accurate reporting. The Penn State Hershey Clinical Simulation Center's scheduling and reporting system can be adapted easily to most simulation centers and can expand and change to meet future growth with little or no expense to the center.

  15. The Composition of the Master Schedule

    Science.gov (United States)

    Thomas, Cynthia C.; Behrend, Dirk; MacMillan, Daniel S.

    2010-01-01

    Over a period of about four months, the IVS Coordinating Center (IVSCC) each year composes the Master Schedule for the IVS observing program of the next calendar year. The process begins in early July when the IVSCC contacts the IVS Network Stations to request information about available station time as well as holiday and maintenance schedules for the upcoming year. Going through various planning stages and a review process with the IVS Observing Program Committee (OPC), the final version of the Master Schedule is posted by early November. We describe the general steps of the composition and illustrate them with the example of the planning for the Master Schedule of the 2010 observing year.

  16. Developing optimal nurses work schedule using integer programming

    Science.gov (United States)

    Shahidin, Ainon Mardhiyah; Said, Mohd Syazwan Md; Said, Noor Hizwan Mohamad; Sazali, Noor Izatie Amaliena

    2017-08-01

    Time management is the art of arranging, organizing and scheduling one's time for the purpose of generating more effective work and productivity. Scheduling is the process of deciding how to commit resources between varieties of possible tasks. Thus, it is crucial for every organization to have a good work schedule for their staffs. The job of Ward nurses at hospitals runs for 24 hours every day. Therefore, nurses will be working using shift scheduling. This study is aimed to solve the nurse scheduling problem at an emergency ward of a private hospital. A 7-day work schedule for 7 consecutive weeks satisfying all the constraints set by the hospital will be developed using Integer Programming. The work schedule for the nurses obtained gives an optimal solution where all the constraints are being satisfied successfully.

  17. Proposing New Heuristic Approaches for Preventive Maintenance Scheduling

    Directory of Open Access Journals (Sweden)

    majid Esmailian

    2013-08-01

    Full Text Available The purpose of preventive maintenance management is to perform a series of tasks that prevent or minimize production breakdowns and improve reliability of production facilities. An important objective of preventive maintenance management is to minimize downtime of production facilities. In order to accomplish this objective, personnel should efficiently allocate resources and determine an effective maintenance schedule. Gopalakrishnan (1997 developed a mathematical model and four heuristic approaches to solve the preventive maintenance scheduling problem of assigning skilled personnel to work with tasks that require a set of corresponding skills. However, there are several limitations in the prior work in this area of research. The craft combination problem has not been solved because the craft combination is assumed as given. The craft combination problem concerns the computation of all combinations of assigning multi skilled workers to accomplishment of a particular task. In fact, determining craft combinations is difficult because of the exponential number of craft combinations that are possible. This research provides a heuristic approach for determining the craft combination and four new heuristic approach solution for the preventive maintenance scheduling problem with multi skilled workforce constraints. In order to examine the new heuristic approach and to compare the new heuristic approach with heuristic approach of Gopalakrishnan (1997, 81 standard problems have been generated based on the criterion suggested by from Gopalakrishnan (1997. The average solution quality (SQ of the new heuristic approaches is 1.86% and in old heuristic approaches is 8.32%. The solution time of new heuristic approaches are shorter than old heuristic approaches. The solution time of new heuristic approaches is 0.78 second and old heuristic approaches is 6.43 second, but the solution time of mathematical model provided by Gopalakrishnan (1997 is 152 second.

  18. 77 FR 41258 - FOIA Fee Schedule Update

    Science.gov (United States)

    2012-07-13

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Establishment of FOIA Fee Schedule. SUMMARY: The Defense Nuclear Facilities Safety Board is publishing its Freedom of Information Act (FOIA) Fee Schedule Update pursuant to...

  19. 76 FR 43819 - FOIA Fee Schedule Update

    Science.gov (United States)

    2011-07-22

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Establishment of FOIA Fee Schedule. SUMMARY: The Defense Nuclear Facilities Safety Board is publishing its Freedom of Information Act (FOIA) Fee Schedule Update pursuant to...

  20. 75 FR 7411 - Schedule of Water Charges

    Science.gov (United States)

    2010-02-19

    ... DELAWARE RIVER BASIN COMMISSION 18 CFR Part 410 Schedule of Water Charges AGENCY: Delaware River... Administrative Manual--Part III--Basin Regulations--Water Supply Charges to revise the schedule of water charges... commenter and the subject line ``Schedule of Water Charges.'' FOR FURTHER INFORMATION, CONTACT: Please...

  1. Examining Reports of Mental Health in Adults with Williams Syndrome

    Science.gov (United States)

    Stinton, Chris; Tomlinson, Katie; Estes, Zachary

    2012-01-01

    Prior research suggests that individuals with Williams syndrome (WS) have a disposition towards anxiety. Information regarding this is typically derived from parents and carers. The perspectives of the individuals with WS are rarely included in research of this nature. We examined the mental health of 19 adults with WS using explicit (psychiatric…

  2. [Evolution of worker's health in the social security medical examination in Brazil].

    Science.gov (United States)

    Pinto Júnior, Afrânio Gomes; Braga, Ana Maria Cheble Bahia; Roselli-Cruz, Amadeu

    2012-10-01

    In order to analyze the practice of the social security medical examination starting from the introduction of the worker's health paradigms, data was gathered on the granting of social security disability benefits to assess worker illness based on notification of work-related accidents in the cement industries of Rio de Janeiro. From 2007 to 2009 there was only one notification, which involved a worker handling toxic waste instead of the energy matrix. However, the analysis revealed sources and mechanisms of illness overlooked in the social security medical examination, which is still focused on the one-cause-only logic of occupational medicine. To achieve the worker's health paradigms, changes are required to alter the way of conducting the social security medical examination, by re-establishing partnerships, training human resources, adopting epidemiological indicators, as well as setting and assessing social security goals that transcend the mere granting of disability benefits.

  3. Prescribed Travel Schedules for Fatigue Management

    Science.gov (United States)

    Whitmire, Alexandra; Johnston, Smith; Lockley, Steven

    2011-01-01

    The NASA Fatigue Management Team is developing recommendations for managing fatigue during travel and for shift work operations, as Clinical Practice Guidelines for the Management of Circadian Desynchrony in ISS Operations. The Guidelines provide the International Space Station (ISS ) flight surgeons and other operational clinicians with evidence-based recommendations for mitigating fatigue and other factors related to sleep loss and circadian desynchronization. As much international travel is involved both before and after flight, the guidelines provide recommendations for: pre-flight training, in-flight operations, and post-flight rehabilitation. The objective of is to standardize the process by which care is provided to crewmembers, ground controllers, and other support personnel such as trainers, when overseas travel or schedule shifting is required. Proper scheduling of countermeasures - light, darkness, melatonin, diet, exercise, and medications - is the cornerstone for facilitating circadian adaptation, improving sleep, enhancing alertness, and optimizing performance. The Guidelines provide, among other things, prescribed travel schedules that outline the specific implementation of these mitigation strategies. Each travel schedule offers evidence based protocols for properly using the NASA identified countermeasures for fatigue. This presentation will describe the travel implementation schedules and how these can be used to alleviate the effects of jet lag and/or schedule shifts.

  4. Impact of the Hydrocodone Schedule Change on Opioid Prescription Patterns in South Dakota.

    Science.gov (United States)

    Kuschel, Lauren M; Mort, Jane M

    2017-10-01

    Prescription opioid use is becoming increasingly common; consequently, opioid overdose deaths are increasing at an alarming rate. Hydrocodone, one of the most commonly abused opioids, was changed from a schedule III controlled substance to the more stringent schedule II to decrease abuse and diversion, effective Oct. 6, 2014. The objective of this study was to examine the impact of the hydrocodone schedule change on opioid prescribing in South Dakota. Opioid prescription patterns were examined in the following six-month phases: the baseline phase before the change, the transition phase when existing hydrocodone prescriptions could still be refilled, and the final phase. The South Dakota Board of Pharmacy Prescription Drug Monitoring Program provided aggregate monthly data for South Dakota opioid prescriptions (i.e., total number of prescriptions and days supplied), including urban and rural stratification. T-tests were performed on the monthly values for each phase to determine the significance of differences in prescription features between phases. The number of hydrocodone prescriptions significantly decreased 14 percent from baseline to final phase, while the days supplied per prescription significantly increased 7.4 percent. These changes were greater in rural areas than in urban areas. Conversely, the number of other opioid prescriptions significantly increased by 6.5 percent over this timeframe. The number of hydrocodone prescriptions decreased, while the days supplied per prescription increased. These changes were greater in rural areas than in urban areas. In addition, the number of other opioid prescriptions increased. These trends may reflect some unintended effects of the schedule change.

  5. Examining transgender health through the International Classification of Functioning, Disability, and Health's (ICF) Contextual Factors.

    Science.gov (United States)

    Jacob, Melissa; Cox, Steven R

    2017-12-01

    For many transgender individuals, medical intervention is necessary to live as their desired gender. However, little is known about Contextual Factors (i.e., Environmental and Personal) that may act as facilitators and barriers in the health of transgender individuals. Therefore, this paper sought to examine Contextual Factors of the World Health Organization's International Classification of Functioning, Disability, and Health that may facilitate or negatively impact the physical, psychological, and social functioning of transgender individuals. A literature review was conducted to identify Environmental and Personal Factors that may influence transgender individuals' physical, psychological, and social functioning. Seven electronic databases were searched. In total, 154 records were reviewed, and 41 articles and other records met inclusion criteria. Three general themes emerged for Environmental Factors: family and social networks, education, and health care. Three general themes also emerged for Personal Factors: socioeconomic status, race, and age. Transgender individuals benefit from gender-affirming services, improved family and social support systems, and competent provider care. Educational training programs, including medical curricula or workshops, might provide the greatest benefit in improving transgender health by increasing the knowledge and cultural competency of health professionals working with this population. Given the diversity of gender expression, differences in lived experiences, and potential for enduring persistent "double discrimination" due to the intersectional relationships between socioeconomic status, race, and/or age, health professionals must approach transgender health using a holistic lens such as the World Health Organization's International Classification of Functioning, Disability, and Health.

  6. Changes in health selection of obesity among Mexican immigrants: a binational examination.

    Science.gov (United States)

    Ro, Annie; Fleischer, Nancy

    2014-12-01

    Health selection is often measured by comparing the health of more recent immigrants to the native born of their new host country. However, this comparison fails to take into account two important factors: (1) that changes in the health profile of sending countries may impact the health of immigrants over time, and (2) that the best comparison group for health selection would be people who remain in the country of origin. Obesity represents an important health outcome that may be best understood by taking into account these two factors. Using nationally-representative datasets from Mexico and the US, we examined differences in obesity-related health selection, by gender, in 2000 and 2012. We calculated prevalence ratios from log-binomial models to compare the risk of obesity among recent immigrants to the US to Mexican nationals with varying likelihood of migration, in order to determine changes in health selection over time. Among men in 2000, we found little difference in obesity status between recent immigrants to the US and Mexican non-migrants. However, in 2012, Mexican men who were the least likely to migrate had higher obesity prevalence than recent immigrants, which may reflect emerging health selection. The trends for women, however, indicated differences in obesity status between recent Mexican immigrants and non-migrants at both time points. In both 2000 and 2012, Mexican national women had significantly higher obesity prevalence than recent immigrant women, with the biggest difference between recent immigrants and Mexican women who were least likely to migrate. There was also indication that selection increased with time for women, as the differences between Mexican nationals and recent immigrants to the US grew from 2000 to 2012. Our study is among the first to use a binational dataset to examine the impact of health selectivity, over time, on obesity. Copyright © 2014 Elsevier Ltd. All rights reserved.

  7. Scheduling multimedia services in cloud computing environment

    Science.gov (United States)

    Liu, Yunchang; Li, Chunlin; Luo, Youlong; Shao, Yanling; Zhang, Jing

    2018-02-01

    Currently, security is a critical factor for multimedia services running in the cloud computing environment. As an effective mechanism, trust can improve security level and mitigate attacks within cloud computing environments. Unfortunately, existing scheduling strategy for multimedia service in the cloud computing environment do not integrate trust mechanism when making scheduling decisions. In this paper, we propose a scheduling scheme for multimedia services in multi clouds. At first, a novel scheduling architecture is presented. Then, We build a trust model including both subjective trust and objective trust to evaluate the trust degree of multimedia service providers. By employing Bayesian theory, the subjective trust degree between multimedia service providers and users is obtained. According to the attributes of QoS, the objective trust degree of multimedia service providers is calculated. Finally, a scheduling algorithm integrating trust of entities is proposed by considering the deadline, cost and trust requirements of multimedia services. The scheduling algorithm heuristically hunts for reasonable resource allocations and satisfies the requirement of trust and meets deadlines for the multimedia services. Detailed simulated experiments demonstrate the effectiveness and feasibility of the proposed trust scheduling scheme.

  8. Scheduling nurses’ shifts at PGI Cikini Hospital

    Science.gov (United States)

    Nainggolan, J. C. T.; Kusumastuti, R. D.

    2018-03-01

    Hospitals play an essential role in the community by providing medical services to the public. In order to provide high quality medical services, hospitals must manage their resources (including nurses) effectively and efficiently. Scheduling of nurses’ work shifts, in particular, is crucial, and must be conducted carefully to ensure availability and fairness. This research discusses the job scheduling system for nurses in PGI Cikini Hospital, Jakarta with Goal Programming approach. The research objectives are to identify nurse scheduling criteria and find the best schedule that can meet the criteria. The model has hospital regulations (including government regulations) as hard constraints, and nurses’ preferences as soft constraints. We gather primary data (hospital regulations and nurses’ preferences) through interviews with three Head Nurses and distributing questionnaires to fifty nurses. The results show that on the best schedule, all hard constraints can be satisfied. However, only two out of four soft constraints are satisfied. Compared to current scheduling practice, the resulting schedule ensures the availability of nurses as it satisfies all hospital’s regulations and it has a higher level of fairness as it can accommodate some of the nurses’ preferences.

  9. Needs analysis and project schedule for the Los Alamos National Laboratory (LANL) Health Physics Analysis Laboratory (HPAL) upgrade

    International Nuclear Information System (INIS)

    Rhea, T.A.; Rucker, T.L.; Stafford, M.W.

    1990-01-01

    This report is a needs assessment and project schedule for the Health Physics Analysis Laboratory (HPAL) upgrade project at Los Alamos National Laboratory (LANL). After reviewing current and projected HPAL operations, two custom-developed laboratory information management systems (LIMS) for similar facilities were reviewed; four commercially available LIMS products were also evaluated. This project is motivated by new regulations for radiation protection and training and by increased emphasis on quality assurance (QA). HPAL data are used to: protect the health of radiation workers; document contamination levels for transportation of radioactive materials and for release of materials to the public for uncontrolled use; and verify compliance with environmental emission regulations. Phase 1 of the HPAL upgrade project concentrates on four types of counting instruments which support in excess of 90% of the sample workload at the existing central laboratories. Phase 2 is a refinement phase and also integrates summary-level databases on the central Health, Safety, and Environment (HSE) VAX. Phase 3 incorporates additional instrument types and integrates satellite laboratories into the HPAL LIMS. Phase 1 will be a multi-year, multimillion dollar project. The temptation to approach the upgrade of the HPAL program in a piece meal fashion should be avoided. This is a major project, with clearly-defined goals and priorities, and should be approached as such. Major programmatic and operational impacts will be felt throughout HSE as a result of this upgrade, so effective coordination with key customer contacts will be critical

  10. Analysis and Optimisation of Hierarchically Scheduled Multiprocessor Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Traian; Pop, Paul; Eles, Petru

    2008-01-01

    We present an approach to the analysis and optimisation of heterogeneous multiprocessor embedded systems. The systems are heterogeneous not only in terms of hardware components, but also in terms of communication protocols and scheduling policies. When several scheduling policies share a resource......, they are organised in a hierarchy. In this paper, we first develop a holistic scheduling and schedulability analysis that determines the timing properties of a hierarchically scheduled system. Second, we address design problems that are characteristic to such hierarchically scheduled systems: assignment...... of scheduling policies to tasks, mapping of tasks to hardware components, and the scheduling of the activities. We also present several algorithms for solving these problems. Our heuristics are able to find schedulable implementations under limited resources, achieving an efficient utilisation of the system...

  11. Flow shop scheduling with heterogeneous workers

    OpenAIRE

    Benavides, Alexander J.; Ritt, Marcus; Miralles Insa, Cristóbal Javier

    2014-01-01

    We propose an extension to the flow shop scheduling problem named Heterogeneous Flow Shop Scheduling Problem (Het-FSSP), where two simultaneous issues have to be resolved: finding the best worker assignment to the workstations, and solving the corresponding scheduling problem. This problem is motivated by Sheltered Work centers for Disabled, whose main objective is the labor integration of persons with disabilities, an important aim not only for these centers but for any company d...

  12. An improved scheduling algorithm for linear networks

    KAUST Repository

    Bader, Ahmed; Alouini, Mohamed-Slim; Ayadi, Yassin

    2017-01-01

    In accordance with the present disclosure, embodiments of an exemplary scheduling controller module or device implement an improved scheduling process such that the targeted reduction in schedule length can be achieve while incurring minimal energy penalty by allowing for a large rate (or duration) selection alphabet.

  13. 21 CFR 113.83 - Establishing scheduled processes.

    Science.gov (United States)

    2010-04-01

    ... commercial production runs should be determined on the basis of recognized scientific methods to be of a size... CONTAINERS Production and Process Controls § 113.83 Establishing scheduled processes. Scheduled processes for... production shall be adequately provided for in establishing the scheduled process. Critical factors, e.g...

  14. An improved scheduling algorithm for linear networks

    KAUST Repository

    Bader, Ahmed

    2017-02-09

    In accordance with the present disclosure, embodiments of an exemplary scheduling controller module or device implement an improved scheduling process such that the targeted reduction in schedule length can be achieve while incurring minimal energy penalty by allowing for a large rate (or duration) selection alphabet.

  15. Mechanisms for scheduling games with selfish players

    NARCIS (Netherlands)

    Hoeksma, R.P.

    2015-01-01

    Many challenges in operations research involve optimization. In particular, scheduling treats the optimal planning of tasks. This thesis focuses on machine scheduling models, where a number of tasks, called jobs, need to be scheduled on one or more machines. The outcome is determined by which job is

  16. Social exclusion, caste & health: a review based on the social determinants framework.

    Science.gov (United States)

    Nayar, K R

    2007-10-01

    Poverty and social exclusion are important socio-economic variables which are often taken for granted while considering ill-health effects. Social exclusion mainly refers to the inability of our society to keep all groups and individuals within reach of what we expect as society to realize their full potential. Marginalization of certain groups or classes occurs in most societies including developed countries and perhaps it is more pronounced in underdeveloped countries. In the Indian context, caste may be considered broadly as a proxy for socio-economic status and poverty. In the identification of the poor, scheduled caste and scheduled tribes and in some cases the other backward castes are considered as socially disadvantaged groups and such groups have a higher probability of living under adverse conditions and poverty. The health status and utilization patterns of such groups give an indication of their social exclusion as well as an idea of the linkages between poverty and health. In this review, we examined broad linkages between caste and some select health/health utilization indicators. We examined data on prevalence of anaemia, treatment of diarrhoea, infant mortality rate, utilization of maternal health care and childhood vaccinations among different caste groups in India. The data based on the National Family Health Survey II (NFHS II) highlight considerable caste differentials in health. The linkages between caste and some health indicators show that poverty is a complex issue which needs to be addressed with a multi-dimensional paradigm. Minimizing the suffering from poverty and ill-health necessitates recognizing the complexity and adopting a perspective such as holistic epidemiology which can challenge pure technocentric approaches to achieve health status.

  17. Optimal investment and scheduling of distributed energy resources with uncertainty in electric vehicles driving schedules

    Energy Technology Data Exchange (ETDEWEB)

    Cardoso, Goncalo [Technical Univ. of Lisbon (Portugal); Stadler, Michael [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Center for Energy and Innovation Technologies (Austria); Bozchalui, Mohammed C. [NEC Laboratories American Inc., Irving, TX (United States); Sharma, Ratnesh [NEC Laboratories American Inc., Irving, TX (United States); Marnay, Chris [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Barbosa-Povoa, Ana [Technical Univ. of Lisbon (Portugal); Ferrao, Paulo [Technical Univ. of Lisbon (Portugal)

    2013-12-06

    The large scale penetration of electric vehicles (EVs) will introduce technical challenges to the distribution grid, but also carries the potential for vehicle-to-grid services. Namely, if available in large enough numbers, EVs can be used as a distributed energy resource (DER) and their presence can influence optimal DER investment and scheduling decisions in microgrids. In this work, a novel EV fleet aggregator model is introduced in a stochastic formulation of DER-CAM [1], an optimization tool used to address DER investment and scheduling problems. This is used to assess the impact of EV interconnections on optimal DER solutions considering uncertainty in EV driving schedules. Optimization results indicate that EVs can have a significant impact on DER investments, particularly if considering short payback periods. Furthermore, results suggest that uncertainty in driving schedules carries little significance to total energy costs, which is corroborated by results obtained using the stochastic formulation of the problem.

  18. An improved sheep flock heredity algorithm for job shop scheduling and flow shop scheduling problems

    Directory of Open Access Journals (Sweden)

    Chandramouli Anandaraman

    2011-10-01

    Full Text Available Job Shop Scheduling Problem (JSSP and Flow Shop Scheduling Problem (FSSP are strong NP-complete combinatorial optimization problems among class of typical production scheduling problems. An improved Sheep Flock Heredity Algorithm (ISFHA is proposed in this paper to find a schedule of operations that can minimize makespan. In ISFHA, the pairwise mutation operation is replaced by a single point mutation process with a probabilistic property which guarantees the feasibility of the solutions in the local search domain. A Robust-Replace (R-R heuristic is introduced in place of chromosomal crossover to enhance the global search and to improve the convergence. The R-R heuristic is found to enhance the exploring potential of the algorithm and enrich the diversity of neighborhoods. Experimental results reveal the effectiveness of the proposed algorithm, whose optimization performance is markedly superior to that of genetic algorithms and is comparable to the best results reported in the literature.

  19. A Scoping Review of Observational Studies Examining Relationships between Environmental Behaviors and Health Behaviors

    Directory of Open Access Journals (Sweden)

    Jayne Hutchinson

    2015-05-01

    Full Text Available Individual lifestyles are key drivers of both environmental change and chronic disease. We undertook a scoping review of peer-reviewed studies which examined associations between environmental and health behaviors of individuals in high-income countries. We searched EconLit, Medline, BIOSIS and the Social Science Citation Index. A total of 136 studies were included. The majority were USA-based cross-sectional studies using self-reported measures. Most of the evidence related to travel behavior, particularly active travel (walking and cycling and physical activity (92 studies or sedentary behaviors (19 studies. Associations of public transport use with physical activity were examined in 18 studies, and with sedentary behavior in one study. Four studies examined associations between car use and physical activity. A small number included other environmental behaviors (food-related behaviors (n = 14, including organic food, locally-sourced food and plate waste and other health behaviors ((n = 20 smoking, dietary intake, alcohol. These results suggest that research on individual environmental and health behaviors consists largely of studies examining associations between travel mode and levels of physical activity. There appears to be less research on associations between other behaviors with environmental and health impacts, and very few longitudinal studies in any domain.

  20. GSA eLibrary Schedules and Contracts

    Data.gov (United States)

    General Services Administration — GSA eLibrary (formerly Schedules e-Library) is the online source for the latest contract award information for: GSA Schedules; Department of Veterans Affairs (VA)...

  1. Minimizing tardiness for job shop scheduling under uncertainties

    OpenAIRE

    Yahouni , Zakaria; Mebarki , Nasser; Sari , Zaki

    2016-01-01

    International audience; —Many disturbances can occur during the execution of a manufacturing scheduling process. To cope with this drawback , flexible solutions are proposed based on the offline and the online phase of the schedule. Groups of permutable operations is one of the most studied flexible scheduling methods bringing flexibility as well as quality to a schedule. The online phase of this method is based on a human-machine system allowing to choose in real-time one schedule from a set...

  2. Integrated test schedule for buried waste integrated demonstration

    International Nuclear Information System (INIS)

    Brown, J.T.; McDonald, J.K.

    1992-05-01

    The Integrated Test Schedule incorporates the various schedules the Buried Waste Integrated Demonstration (BWID) supports into one document. This document contains the Federal Facilities Agreement and Consent Order schedules for the Idaho National Engineering Laboratory, Hanford Reservation, Oak Ridge Reservation, and Fernald Environmental Materials Center. Included in the Integrated Test Schedule is the Buried Waste Integrated Demonstration ''windows of opportunity'' schedule. The ''windows of opportunity'' schedule shows periods of time in which Buried Waste Integrated Demonstration Program-sponsored technology demonstrations could support key decisions in the Federal Facilities Agreement and Consent Order. Schedules for the Buried Waste Integrated Demonstration-sponsored technology task plans are categorized by technology area and divided by current fiscal year and out-year. Total estimated costs for Buried Waste Integrated Demonstration-sponsored Technology Task Plans for FY-92 through FY-97 are $74.756M

  3. 14 CFR 399.81 - Unrealistic or deceptive scheduling.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Unrealistic or deceptive scheduling. 399.81... Unrealistic or deceptive scheduling. (a) It is the policy of the Board to consider unrealistic scheduling of... to the advertising of scheduled performance, it is the policy of the Board to regard as an unfair or...

  4. LEARNING SCHEDULER PARAMETERS FOR ADAPTIVE PREEMPTION

    OpenAIRE

    Prakhar Ojha; Siddhartha R Thota; Vani M; Mohit P Tahilianni

    2015-01-01

    An operating system scheduler is expected to not allow processor stay idle if there is any process ready or waiting for its execution. This problem gains more importance as the numbers of processes always outnumber the processors by large margins. It is in this regard that schedulers are provided with the ability to preempt a running process, by following any scheduling algorithm, and give us an illusion of simultaneous running of several processes. A process which is allowed t...

  5. Topology-based hierarchical scheduling using deficit round robin

    DEFF Research Database (Denmark)

    Yu, Hao; Yan, Ying; Berger, Michael Stubert

    2009-01-01

    according to the topology. The mapping process could be completed through the network management plane or by manual configuration. Based on the knowledge of the network, the scheduler can manage the traffic on behalf of other less advanced nodes, avoid potential traffic congestion, and provide flow...... protection and isolation. Comparisons between hierarchical scheduling, flow-based scheduling, and class-based scheduling schemes have been carried out under a symmetric tree topology. Results have shown that the hierarchical scheduling scheme provides better flow protection and isolation from attack...

  6. The Risk of Developing Diabetes in Association With Long Working Hours Differs by Shift Work Schedules

    OpenAIRE

    Bannai, Akira; Yoshioka, Eiji; Saijo, Yasuaki; Sasaki, Sachiko; Kishi, Reiko; Tamakoshi, Akiko

    2016-01-01

    Background: The impact of long working hours on diabetes is controversial; however, shift work is known to increase the risk of diabetes. This study aimed to investigate the association between long working hours and diabetes among civil servants in Japan separately by shift work schedules. Methods: A prospective cohort study was conducted from April 2003 to March 2009. A total of 3195 men aged >= 35 years who underwent an annual health checkup at baseline were analyzed by shift work schedule...

  7. 33 CFR 401.58 - Pleasure craft scheduling.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Pleasure craft scheduling. 401.58... OF TRANSPORTATION SEAWAY REGULATIONS AND RULES Regulations Seaway Navigation § 401.58 Pleasure craft scheduling. (a) The transit of pleasure craft shall be scheduled by the traffic controller or the officer in...

  8. Spike: Artificial intelligence scheduling for Hubble space telescope

    Science.gov (United States)

    Johnston, Mark; Miller, Glenn; Sponsler, Jeff; Vick, Shon; Jackson, Robert

    1990-01-01

    Efficient utilization of spacecraft resources is essential, but the accompanying scheduling problems are often computationally intractable and are difficult to approximate because of the presence of numerous interacting constraints. Artificial intelligence techniques were applied to the scheduling of the NASA/ESA Hubble Space Telescope (HST). This presents a particularly challenging problem since a yearlong observing program can contain some tens of thousands of exposures which are subject to a large number of scientific, operational, spacecraft, and environmental constraints. New techniques were developed for machine reasoning about scheduling constraints and goals, especially in cases where uncertainty is an important scheduling consideration and where resolving conflicts among conflicting preferences is essential. These technique were utilized in a set of workstation based scheduling tools (Spike) for HST. Graphical displays of activities, constraints, and schedules are an important feature of the system. High level scheduling strategies using both rule based and neural network approaches were developed. While the specific constraints implemented are those most relevant to HST, the framework developed is far more general and could easily handle other kinds of scheduling problems. The concept and implementation of the Spike system are described along with some experiments in adapting Spike to other spacecraft scheduling domains.

  9. Step-by-step cyclic processes scheduling

    DEFF Research Database (Denmark)

    Bocewicz, G.; Nielsen, Izabela Ewa; Banaszak, Z.

    2013-01-01

    Automated Guided Vehicles (AGVs) fleet scheduling is one of the big problems in Flexible Manufacturing System (FMS) control. The problem is more complicated when concurrent multi-product manufacturing and resource deadlock avoidance policies are considered. The objective of the research is to pro......Automated Guided Vehicles (AGVs) fleet scheduling is one of the big problems in Flexible Manufacturing System (FMS) control. The problem is more complicated when concurrent multi-product manufacturing and resource deadlock avoidance policies are considered. The objective of the research...... is to provide a declarative model enabling to state a constraint satisfaction problem aimed at AGVs fleet scheduling subject to assumed itineraries of concurrently manufactured product types. In other words, assuming a given layout of FMS’s material handling and production routes of simultaneously manufactured...... orders, the main objective is to provide the declarative framework aimed at conditions allowing one to calculate the AGVs fleet schedule in online mode. An illustrative example of the relevant algebra-like driven step-by-stem cyclic scheduling is provided....

  10. Schedules for home visits in the early postpartum period.

    Science.gov (United States)

    Yonemoto, Naohiro; Dowswell, Therese; Nagai, Shuko; Mori, Rintaro

    2017-08-02

    Maternal complications including psychological and mental health problems and neonatal morbidity have been commonly observed in the postpartum period. Home visits by health professionals or lay supporters in the weeks following the birth may prevent health problems from becoming chronic with long-term effects on women, their babies, and their families. To assess outcomes for women and babies of different home-visiting schedules during the early postpartum period. The review focuses on the frequency of home visits, the duration (when visits ended) and intensity, and on different types of home-visiting interventions. We searched the Cochrane Pregnancy and Childbirth Group's Trials Register (28 January 2013) and reference lists of retrieved articles. Randomised controlled trials (RCTs) (including cluster-RCTs) comparing different types of home-visiting interventions enrolling participants in the early postpartum period (up to 42 days after birth). We excluded studies in which women were enrolled and received an intervention during the antenatal period (even if the intervention continued into the postnatal period) and studies recruiting only women from specific high-risk groups. (e.g. women with alcohol or drug problems). Study eligibility was assessed by at least two review authors. Data extraction and assessment of risk of bias were carried out independently by at least two review authors. Data were entered into Review Manager software. We included data from 12 randomised trials with data for more than 11,000 women. The trials were carried out in countries across the world, and in both high- and low-resource settings. In low-resource settings women receiving usual care may have received no additional postnatal care after early hospital discharge.The interventions and control conditions varied considerably across studies with trials focusing on three broad types of comparisons: schedules involving more versus fewer postnatal home visits (five studies), schedules

  11. Routine environmental monitoring schedule, calendar year 1997

    Energy Technology Data Exchange (ETDEWEB)

    Markes, B.M., Westinghouse Hanford

    1996-12-10

    This document provides the Environmental Restorations Contractor (ERC) and the Project Hanford Management Contractor.(PHMC) a schedule in accordance with the WHC-CM-7-5, Environmental Compliance` and BHI- EE-02, Environmental Requirements, of monitoring and sampling routines for the Near-Field Monitoring (NFM) program during calendar year (CY) 1997. Every attempt will be made to consistently follow this schedule; any deviation from this schedule will be documented by an internal memorandum (DSI) explaining the reason for the deviation. The DSI will be issued by the scheduled performing organization and directed to Near-Field Monitoring. The survey frequencies for particular sites are determined by the technical judgment of Near- Field Monitoring and may depend on the site history, radiological status, use, and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive wastes sites are scheduled to be surveyed at least annually. Any newly discovered wastes sites not documented by this schedule will be included in the revised schedule for CY 1998. The outside perimeter road surveys of 200 East and West Area and the rail survey from the 300 Area to Columbia Center will be performed in the year 2000 per agreement with Department of Energy. Richland Field Office. This schedule does not discuss staffing needs, nor does it list the monitoring equipment to be used in completing specific routines. Personnel performing routines to meet this schedule shall communicate any need for assistance in completing these routines to Radiological Control management and Near-Field Monitoring. After each routine survey is completed, a copy of the survey record, maps, and data sheets will be forwarded to Near-Field Monitoring. These routine surveys will not be considered complete until this documentation is received. At the end of each month, the ERC and PHMC radiological control organizations shall forward a copy of the Routine

  12. A multistate examination of partnership activity among local public health systems using the National Public Health Performance Standards.

    Science.gov (United States)

    Barnes, Priscilla A; Curtis, Amy B; Hall-Downey, Laura; Moonesinghe, Ramal

    2012-01-01

    This study examines whether partnership-related measures in the second version of the National Public Health Performance Standards (NPHPS) are useful in evaluating level of activity as well as identifying latent constructs that exist among local public health systems (LPHSs). In a sample of 110 LPHSs, descriptive analysis was conducted to determine frequency and percentage of 18 partnership-related NPHPS measures. Principal components factor analysis was conducted to identify unobserved characteristics that promote effective partnerships among LPHSs. Results revealed that 13 of the 18 measures were most frequently reported at the minimal-moderate level (conducted 1%-49% of the time). Coordination of personal health and social services to optimize access (74.6%) was the most frequently reported measure at minimal-moderate levels. Optimal levels (conducted >75% of the time) were reported most frequently in 2 activities: participation in emergency preparedness coalitions and local health departments ensuring service provision by working with state health departments (67% and 61% of respondents, respectively) and the least optimally reported activity was review partnership effectiveness (4% of respondents). Factor analysis revealed categories of partnership-related measures in 4 domains: resources and activities contributing to relationship building, evaluating community leadership activities, research, and state and local linkages to support public health activities. System-oriented public health assessments may have questions that serve as proxy measures to examine levels of interorganizational partnerships. Several measures from the NPHPS were useful in establishing a national baseline of minimal and optimal activity levels as well as identifying factors to enhance the delivery of the 10 essential public health services among organizations and individuals in public health systems.

  13. Decay-usage scheduling in multiprocessors

    NARCIS (Netherlands)

    Epema, D.H.J.

    1998-01-01

    Decay-usage scheduling is a priority-aging time-sharing scheduling policy capable of dealing with a workload of both interactive and batch jobs by decreasing the priority of a job when it acquires CPU time, and by increasing its priority when it does not use the (a) CPU. In this article we deal with

  14. A Study on the Effect on Scheduling and Management of Surgeries with the Introduction of Excellent Medical Information.

    Science.gov (United States)

    Mei, Tsai Ching

    2016-01-01

    The services of OR play an important role in the medical business for department of surgery. The most important issue for OR is about the scheduling and management of surgeries. Good surgery schedule could elevate the utilization efficiency of OR. Therefore, the introduction of excellent medical information can both dramatically elevate the work efficiency of health care employees and reduce workload to reach win-win benefits in both management and performance.

  15. Case scheduling preferences of one Surgeon's cataract surgery patients.

    Science.gov (United States)

    Dexter, Franklin; Birchansky, Lee; Bernstein, James M; Wachtel, Ruth E

    2009-02-01

    The increase in the number of operating rooms nationwide in the United States may reflect preferences of patients for scheduling of outpatient surgery. Yet, little is known of the importance that patients place on scheduling convenience and flexibility. Fifty cataract surgery patients seen by a surgeon at his main office during a 6-mo period responded to a marketing survey. All the patients had Medicare insurance and supplemental insurance permitting surgery at any facility. A telephone questionnaire included four vignettes describing different choices in the scheduling of cataract surgery. Respondents were asked how far they would be willing to travel for one option instead of another. For example, "Your surgery will be on Thursday in three weeks at 2 pm. You can drink water until 9 am. You arrive at 10 am, because your surgery might start early. If you travel farther, you would arrive at 8 am for 9 am surgery." The median (50th percentile) additional travel time was 60 min (lower 95% confidence bound >or=52 min) for each of four options: to receive care on a day chosen by the patient instead of assigned by the physician, to receive care at a single site instead of both the surgeon's office and a surgery center at a different location, to combine the examination and the surgery into a single visit instead of two visits, and to have surgery in the morning instead of the afternoon. The patients of this ophthalmologist placed a high value on convenience and flexibility in scheduling their surgery. In general, this would be achievable only if many operating rooms were available each morning.

  16. Quality-aware scheduling for key-value data stores

    CERN Document Server

    Xu, Chen

    2015-01-01

    This book comprehensively illustrates quality-ware scheduling in key-value stores. In addition, it provides scheduling strategies and a prototype framework of quality-aware scheduler as well as a demonstration of online applications. The book offers a rich blend of theory and practice which is suitable for students, researchers and practitioners interested in distributed systems, NoSQL key-value stores and scheduling.

  17. Examining the Impact of Maternal Health, Race, and Socioeconomic Status on Daughter's Self-Rated Health Over Three Decades.

    Science.gov (United States)

    Shippee, Tetyana P; Rowan, Kathleen; Sivagnanam, Kamesh; Oakes, J Michael

    2015-09-01

    This study examines the role of mother's health and socioeconomic status on daughter's self-rated health using data spanning three decades from the National Longitudinal Surveys of Mature Women and Young Women (N = 1,848 matched mother-daughter pairs; 1,201 White and 647 African American). Using nested growth curve models, we investigated whether mother's self-rated health affected the daughter's self-rated health and whether socioeconomic status mediated this relationship. Mother's health significantly influenced daughters' self-rated health, but the findings were mediated by mother's socioeconomic status. African American daughters reported lower self-rated health and experienced more decline over time compared with White daughters, accounting for mother's and daughter's covariates. Our findings reveal maternal health and resources as a significant predictor of daughters' self-rated health and confirm the role of socioeconomic status and racial disparities over time. © The Author(s) 2015.

  18. Schedulability Analysis for Java Finalizers

    DEFF Research Database (Denmark)

    Bøgholm, Thomas; Hansen, Rene Rydhof; Søndergaard, Hans

    2010-01-01

    Java finalizers perform clean-up and finalisation of objects at garbage collection time. In real-time Java profiles the use of finalizers is either discouraged (RTSJ, Ravenscar Java) or even disallowed (JSR-302), mainly because of the unpredictability of finalizers and in particular their impact...... on the schedulability analysis. In this paper we show that a controlled scoped memory model results in a structured and predictable execution of finalizers, more reminiscent of C++ destructors than Java finalizers. Furthermore, we incorporate finalizers into a (conservative) schedulability analysis for Predictable Java...... programs. Finally, we extend the SARTS tool for automated schedulability analysis of Java bytecode programs to handle finalizers in a fully automated way....

  19. The many faces of manhood: examining masculine norms and health behaviors of young fathers across race.

    Science.gov (United States)

    Gordon, Derrick M; Hawes, Samuel W; Reid, Allecia E; Callands, Tamora A; Magriples, Urania; Divney, Anna; Niccolai, Linda M; Kershaw, Trace

    2013-09-01

    This study examined the relationship between the traditional masculine norms ("status," "toughness" and "antifemininity") of 296 ethnically and racially diverse, young men transitioning to fatherhood and substance use (smoking, alcohol, marijuana, hard drugs) and health behaviors (diet, exercise). Participants were recruited from urban obstetric clinics in the Northeast United States. Logistic and multiple regression equations were constructed to examine the relationship between masculine norms and health behaviors. Moderator effects were also examined. Masculine norm "status" was most endorsed and "antifemininity" was least endorsed. African American young men had higher masculine norm scores than Latino and Whites. Different masculine norms were associated with health-promoting and health-undermining behaviors. Different racial groups who had higher scores on some masculine norms were more likely to engage in either health-promoting or health-undermining behaviors when compared with other ethnic groups in this study. These results observed different relationships between the traditional masculine norms measured and the substance use and health behaviors of diverse, young men transitioning to fatherhood. This may have implications for intervention strategies and future research.

  20. Nonblocking Scheduling for Web Service Transactions

    DEFF Research Database (Denmark)

    Alrifai, Mohammad; Balke, Wolf-Tilo; Dolog, Peter

    2007-01-01

    . In this paper, we propose a novel nonblocking scheduling mechanism that is used prior to the actual service invocations. Its aim is to reach an agreement between the client and all participating providers on what transaction processing times have to be expected, accepted, and guaranteed. This enables service......For improved flexibility and concurrent usage existing transaction management models for Web services relax the isolation property of Web service-based transactions. Correctness of the concurrent execution then has to be ensured by commit order-preserving transaction schedulers. However, local...... schedulers of service providers typically do take into account neither time constraints for committing the whole transaction, nor the individual services' constraints when scheduling decisions are made. This often leads to an unnecessary blocking of transactions by (possibly long-running) others...

  1. Two-Agent Single-Machine Scheduling of Jobs with Time-Dependent Processing Times and Ready Times

    Directory of Open Access Journals (Sweden)

    Jan-Yee Kung

    2013-01-01

    Full Text Available Scheduling involving jobs with time-dependent processing times has recently attracted much research attention. However, multiagent scheduling with simultaneous considerations of jobs with time-dependent processing times and ready times is relatively unexplored. Inspired by this observation, we study a two-agent single-machine scheduling problem in which the jobs have both time-dependent processing times and ready times. We consider the model in which the actual processing time of a job of the first agent is a decreasing function of its scheduled position while the actual processing time of a job of the second agent is an increasing function of its scheduled position. In addition, each job has a different ready time. The objective is to minimize the total completion time of the jobs of the first agent with the restriction that no tardy job is allowed for the second agent. We propose a branch-and-bound and several genetic algorithms to obtain optimal and near-optimal solutions for the problem, respectively. We also conduct extensive computational results to test the proposed algorithms and examine the impacts of different problem parameters on their performance.

  2. Flexible Workplace Policies: Lessons from the Federal Alternative Work Schedules Act

    Science.gov (United States)

    Liechty, Janet M.; Anderson, Elaine A.

    2007-01-01

    This case study uses a feminist framework to examine the 7-year process by which the Federal Alternative Work Schedules Act (1978-1985) became law and the reasons for reenergized implementation in the 1990s. We analyze the legislative discourse for rationale in support of and opposition to this policy, connect findings to current flexible work…

  3. Schedule optimization study implementation plan

    International Nuclear Information System (INIS)

    1993-11-01

    This Implementation Plan is intended to provide a basis for improvements in the conduct of the Environmental Restoration (ER) Program at Hanford. The Plan is based on the findings of the Schedule Optimization Study (SOS) team which was convened for two weeks in September 1992 at the request of the U.S. Department of Energy (DOE) Richland Operations Office (RL). The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit (OU) Remedial Investigation/Feasibility Study (RI/FS) Work Plan. The SOS team was comprised of independent professionals from other federal agencies and the private sector experienced in environmental restoration within the federal system. The objective of the team was to examine reasons for the lengthy RI/FS process and recommend ways to expedite it. The SOS team issued their Final Report in December 1992. The report found the most serious impediments to cleanup relate to a series of management and policy issues which are within the control of the three parties managing and monitoring Hanford -- the DOE, U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology). The SOS Report identified the following eight cross-cutting issues as the root of major impediments to the Hanford Site cleanup. Each of these eight issues is quoted from the SOS Report followed by a brief, general description of the proposed approach being developed

  4. Flexible Work Schedules. ERIC Digest.

    Science.gov (United States)

    Kerka, Sandra

    Flexible work schedules are one response to changes in the composition of the work force, new life-styles, and changes in work attitudes. Types of alternative work schedules are part-time and temporary employment, job sharing, and flextime. Part-time workers are a diverse group--women, the very young, and older near-retirees. Although part-time…

  5. Periodic health examination, 1995 update: 1. Screening for human papillomavirus infection in asymptomatic women. Canadian Task Force on the Periodic Health Examination.

    Science.gov (United States)

    Johnson, K

    1995-02-15

    To develop recommendations for practising physicians on the advisability of screening for human papillomavirus (HPV) infection in asymptomatic women. Visual inspection, Papanicolaou testing, colposcopy or cervicography, use of HPV group-specific antigen, DNA hybridization, dot blot technique, Southern blot technique or polymerase chain reaction followed by physical or chemical therapeutic intervention. Evidence for a link between HPV infection and cervical cancer, sensitivity and specificity of HPV screening techniques, effectiveness of treatments for HPV infection, and the social and economic costs incurred by screening. MEDLINE was searched for articles published between January 1966 to June 1993 with the use of the key words "papillomavirus," "cervix neoplasms," "mass screening," "prospective studies," "prevalence," "sensitivity," "specificity," "human" and "female." Proven cost-effective screening techniques that could lead to decreased morbidity or mortality were given a high value. The evidence-based methods and values of the Canadian Task Force on the Periodic Health Examination were used. Potential benefits are to prevent cervical cancer and eliminate HPV infection. Potential harmful effects include the creation of an unnecessary burden on the health care system and the labelling of otherwise healthy people as patients with a sexually transmitted disease for which therapy is generally ineffective. Potential costs would include expense of testing, increased use of colposcopy and treatment. There is fair evidence to exclude HPV screening (beyond Papanicolaou testing for cervical cancer) in asymptomatic women (grade D recommendation). The report was reviewed by members of the task force and three external reviewers who were selected to represent different areas of expertise. These guidelines were developed and endorsed by the task force, which is funded by Health Canada and the National Health Research and Development Program. The principal author (K.J.) was

  6. Examining Mental Health Differences between Transfer and Nontransfer University Students Seeking Counseling Services

    Science.gov (United States)

    Mehr, Kristin E.; Daltry, Rachel

    2016-01-01

    This article sought to examine the differences between transfer and nontransfer students on mental health factors, social involvement, and academic success. It was found that transfer students had significantly higher scores on several mental health factors as compared to nontransfer students. It was also found that transfer students were less…

  7. Toward an Autonomous Telescope Network: the TBT Scheduler

    Science.gov (United States)

    Racero, E.; Ibarra, A.; Ocaña, F.; de Lis, S. B.; Ponz, J. D.; Castillo, M.; Sánchez-Portal, M.

    2015-09-01

    Within the ESA SSA program, it is foreseen to deploy several robotic telescopes to provide surveillance and tracking services for hazardous objects. The TBT project will procure a validation platform for an autonomous optical observing system in a realistic scenario, consisting of two telescopes located in Spain and Australia, to collect representative test data for precursor SSA services. In this context, the planning and scheduling of the night consists of two software modules, the TBT Scheduler, that will allow the manual and autonomous planning of the night, and the control of the real-time response of the system, done by the RTS2 internal scheduler. The TBT Scheduler allocates tasks for both telescopes without human intervention. Every night it takes all the inputs needed and prepares the schedule following some predefined rules. The main purpose of the scheduler is the distribution of the time for follow-up of recently discovered targets and surveys. The TBT Scheduler considers the overall performance of the system, and combine follow-up with a priori survey strategies for both kind of objects. The strategy is defined according to the expected combined performance for both systems the upcoming night (weather, sky brightness, object accessibility and priority). Therefore, TBT Scheduler defines the global approach for the network and relies on the RTS2 internal scheduler for the final detailed distribution of tasks at each sensor.

  8. Modelling altered fractionation schedules

    International Nuclear Information System (INIS)

    Fowler, J.F.

    1993-01-01

    The author discusses the conflicting requirements of hyperfractionation and accelerated fractionation used in radiotherapy, and the development of computer modelling to predict how to obtain an optimum of tumour cell kill without exceeding normal-tissue tolerance. The present trend is to shorten hyperfractionated schedules from 6 or 7 weeks to give overall times of 4 or 5 weeks as in new schedules by Herskovic et al (1992) and Harari (1992). Very high doses are given, much higher than can be given when ultrashort schedules such as CHART (12 days) are used. Computer modelling has suggested that optimum overall times, to yield maximum cell kill in tumours ((α/β = 10 Gy) for a constant level of late complications (α/β = 3 Gy) would be X or X-1 weeks, where X is the doubling time of the tumour cells in days (Fowler 1990). For median doubling times of about 5 days, overall times of 4 or 5 weeks should be ideal. (U.K.)

  9. Advisory Committee on Immunization Practices Recommended Immunization Schedule for Children and Adolescents Aged 18 Years or Younger - United States, 2018.

    Science.gov (United States)

    Robinson, Candice L; Romero, José R; Kempe, Allison; Pellegrini, Cynthia; Szilagyi, Peter

    2018-02-09

    In October 2017, the Advisory Committee on Immunization Practices (ACIP) approved the Recommended Immunization Schedule for Children and Adolescents Aged 18 Years or Younger - United States, 2018. The 2018 child and adolescent immunization schedule summarizes ACIP recommendations, including several changes from the 2017 immunization schedules, in three figures and footnotes to the figures. These documents can be found on the CDC immunization schedule website (https://www.cdc.gov/vaccines/schedules/index.html). These immunization schedules are approved by ACIP (https://www.cdc.gov/vaccines/acip/index.html), the American Academy of Pediatrics (https://www.aap.org), the American Academy of Family Physicians (https://www.aafp.org), and the American College of Obstetricians and Gynecologists (https://www.acog.org). Health care providers are advised to use the figures and the footnotes together. The full ACIP recommendations for each vaccine, including contraindications and precautions, can be found at https://www.cdc.gov/vaccines/hcp/acip-recs/index.html. Providers should be aware that changes in recommendations for specific vaccines can occur between annual updates to the childhood/adolescent immunization schedules. If errors or omissions are discovered within the child and adolescent schedule, CDC posts revised versions on the CDC immunization schedule website.

  10. Pittsburgh International Airport - Scheduled Passenger Traffic

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Here you can find Pittsburgh International Airport’s Monthly Scheduled Traffic Reports. Each of these reports contain a year-over-year (YOY) analysis of scheduled...

  11. Measuring Disability and Its Predicting Factors in a Large Database in Taiwan Using the World Health Organization Disability Assessment Schedule 2.0

    Directory of Open Access Journals (Sweden)

    Wen-Chou Chi

    2014-11-01

    Full Text Available The definition of disability had been unclear until the International Classification of Functioning, Disability, and Health was promulgated in 2001 by the World Health Organization (WHO. Disability is a critical but relatively neglected public-health concern. We conducted this study to measure disabilities by using the WHO Disability Assessment Schedule 2.0 (WHODAS 2.0 and identify the factors that contribute to disabilities. We obtained and analyzed the data on people who applied to Taiwan’s disability registration system between September 2012 and August 2013. A total of 158,174 cases were selected for this study. Among the people included in this study, 53% were male, and the females were on average 3 years older than the males. More males than females were of a low socioeconomic status, but the rate of employment was higher among the males than among the females. Age, sex, place of residence, and types and severity of impairment were all determined to be factors that independently contributed to disability. This study has demonstrated that disability can be measured and compared using WHODAS 2.0. Increasing the public-health attention devoted to disability and identifying the factors associated with disability can promote independence and social participation in people with disabilities.

  12. Measuring disability and its predicting factors in a large database in Taiwan using the World Health Organization Disability Assessment Schedule 2.0.

    Science.gov (United States)

    Chi, Wen-Chou; Chang, Kwang-Hwa; Escorpizo, Reuben; Yen, Chia-Feng; Liao, Hua-Fang; Chang, Feng-Hang; Chiou, Hung-Yi; Teng, Sue-Wen; Chiu, Wen-Ta; Liou, Tsan-Hon

    2014-11-25

    The definition of disability had been unclear until the International Classification of Functioning, Disability, and Health was promulgated in 2001 by the World Health Organization (WHO). Disability is a critical but relatively neglected public-health concern. We conducted this study to measure disabilities by using the WHO Disability Assessment Schedule 2.0 (WHODAS 2.0) and identify the factors that contribute to disabilities. We obtained and analyzed the data on people who applied to Taiwan's disability registration system between September 2012 and August 2013. A total of 158,174 cases were selected for this study. Among the people included in this study, 53% were male, and the females were on average 3 years older than the males. More males than females were of a low socioeconomic status, but the rate of employment was higher among the males than among the females. Age, sex, place of residence, and types and severity of impairment were all determined to be factors that independently contributed to disability. This study has demonstrated that disability can be measured and compared using WHODAS 2.0. Increasing the public-health attention devoted to disability and identifying the factors associated with disability can promote independence and social participation in people with disabilities.

  13. Cloud Service Scheduling Algorithm Research and Optimization

    Directory of Open Access Journals (Sweden)

    Hongyan Cui

    2017-01-01

    Full Text Available We propose a cloud service scheduling model that is referred to as the Task Scheduling System (TSS. In the user module, the process time of each task is in accordance with a general distribution. In the task scheduling module, we take a weighted sum of makespan and flowtime as the objective function and use an Ant Colony Optimization (ACO and a Genetic Algorithm (GA to solve the problem of cloud task scheduling. Simulation results show that the convergence speed and output performance of our Genetic Algorithm-Chaos Ant Colony Optimization (GA-CACO are optimal.

  14. Neighbourhood green space, social environment and mental health: an examination in four European cities.

    Science.gov (United States)

    Ruijsbroek, Annemarie; Mohnen, Sigrid M; Droomers, Mariël; Kruize, Hanneke; Gidlow, Christopher; Gražulevičiene, Regina; Andrusaityte, Sandra; Maas, Jolanda; Nieuwenhuijsen, Mark J; Triguero-Mas, Margarita; Masterson, Daniel; Ellis, Naomi; van Kempen, Elise; Hardyns, Wim; Stronks, Karien; Groenewegen, Peter P

    2017-07-01

    This study examines the relationship between neighbourhood green space, the neighbourhood social environment (social cohesion, neighbourhood attachment, social contacts), and mental health in four European cities. The PHENOTYPE study was carried out in 2013 in Barcelona (Spain), Stoke-on-Trent (United Kingdom), Doetinchem (The Netherlands), and Kaunas (Lithuania). 3771 adults living in 124 neighbourhoods answered questions on mental health, neighbourhood social environment, and amount and quality of green space. Additionally, audit data on neighbourhood green space were collected. Multilevel regression analyses examined the relation between neighbourhood green space and individual mental health and the influence of neighbourhood social environment. Mental health was only related to green (audit) in Barcelona. The amount and quality of neighbourhood green space (audit and perceived) were related to social cohesion in Doetinchem and Stoke-on-Trent and to neighbourhood attachment in Doetinchem. In all four cities, mental health was associated with social contacts. Neighbourhood green was related to mental health only in Barcelona. Though neighbourhood green was related to social cohesion and attachment, the neighbourhood social environment seems not the underlying mechanism for this relationship.

  15. A Gas Scheduling Optimization Model for Steel Enterprises

    Directory of Open Access Journals (Sweden)

    Niu Honghai

    2017-01-01

    Full Text Available Regarding the scheduling problems of steel enterprises, this research designs the gas scheduling optimization model according to the rules and priorities. Considering different features and the process changes of the gas unit in the process of actual production, the calculation model of process state and gas consumption soft measurement together with the rules of scheduling optimization is proposed to provide the dispatchers with real-time gas using status of each process, then help them to timely schedule and reduce the gas volume fluctuations. In the meantime, operation forewarning and alarm functions are provided to avoid the abnormal situation in the scheduling, which has brought about very good application effect in the actual scheduling and ensures the safety of the gas pipe network system and the production stability.

  16. A reduced feedback proportional fair multiuser scheduling scheme

    KAUST Repository

    Shaqfeh, Mohammad

    2011-12-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed and ordered scheduling mechanism. A slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we propose a novel proportional fair multiuser switched-diversity scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the per-user feedback thresholds. We demonstrate by numerical examples that our reduced feedback proportional fair scheduler operates within 0.3 bits/sec/Hz from the achievable rates by the conventional full feedback proportional fair scheduler in Rayleigh fading conditions. © 2011 IEEE.

  17. Where do we stand with fuzzy project scheduling?

    CERN Document Server

    Bonnal, Pierre; Lacoste, Germain

    2004-01-01

    Fuzzy project scheduling has interested several researchers in the past two decades; about 20 articles have been written on this issue. Contrary to stochastic project-scheduling approaches that are used by many project schedulers, and even if the axiomatic associated to the theory of probabilities is not always compatible with decision-making situations, fuzzy project-scheduling approaches that are most suited to these situations have been kept in the academic sphere. This paper starts by recalling the differences one can observe between uncertainty and imprecision. Then most of the published research works that have been done in this field are summarized. Finally, a framework for addressing the resource-constrained fuzzy project- scheduling problem is proposed. This framework uses temporal linguistic descriptors, which might become very interesting features to the project-scheduling practitioners.

  18. Departure Queue Prediction for Strategic and Tactical Surface Scheduler Integration

    Science.gov (United States)

    Zelinski, Shannon; Windhorst, Robert

    2016-01-01

    A departure metering concept to be demonstrated at Charlotte Douglas International Airport (CLT) will integrate strategic and tactical surface scheduling components to enable the respective collaborative decision making and improved efficiency benefits these two methods of scheduling provide. This study analyzes the effect of tactical scheduling on strategic scheduler predictability. Strategic queue predictions and target gate pushback times to achieve a desired queue length are compared between fast time simulations of CLT surface operations with and without tactical scheduling. The use of variable departure rates as a strategic scheduler input was shown to substantially improve queue predictions over static departure rates. With target queue length calibration, the strategic scheduler can be tuned to produce average delays within one minute of the tactical scheduler. However, root mean square differences between strategic and tactical delays were between 12 and 15 minutes due to the different methods the strategic and tactical schedulers use to predict takeoff times and generate gate pushback clearances. This demonstrates how difficult it is for the strategic scheduler to predict tactical scheduler assigned gate delays on an individual flight basis as the tactical scheduler adjusts departure sequence to accommodate arrival interactions. Strategic/tactical scheduler compatibility may be improved by providing more arrival information to the strategic scheduler and stabilizing tactical scheduler changes to runway sequence in response to arrivals.

  19. Mental disorder and victimisation in prison: Examining the role of mental health treatment.

    Science.gov (United States)

    Daquin, Jane C; Daigle, Leah E

    2018-04-01

    There is evidence that people with mental disorders are at increased risk of victimisation in prison. It is unclear whether this risk of victimisation varies across types of disorders or symptoms and what role mental health treatment has on victimisation risk in this context. To examine the relationship between specific mental disorders, psychiatric symptoms, and victimisation in prison and the effect of treatment for the disorders on victimisation risk. Using a nationally-representative sample of prisoners, path analyses were conducted to examine the relationship between mental disorder and victimisation. The analyses also examined whether receiving mental health treatment in prison affected any such relationship. Victimisation risk varied with the type of mental disorder or symptoms. Depression, personality disorder, hopelessness, paranoia, and hallucinations were associated with increased victimisation risk. Psychotic illnesses were otherwise negatively associated with victimisation. Receiving mental health treatment in prison was associated with greater risk of victimisation there. Receiving treatment appeared to mediate the relationship between mental disorders, symptoms, and victimisation. The findings suggest that not all inmates with mental disorders are at an increased risk of victimisation. Further, mental health treatment in prison also appears to be a risk factor of victimisation. More research is needed to further elucidate the relationship between mental disorders, treatment, and victimisation. Copyright © 2017 John Wiley & Sons, Ltd. Copyright © 2017 John Wiley & Sons, Ltd.

  20. Job schedulers for Big data processing in Hadoop environment: testing real-life schedulers using benchmark programs

    Directory of Open Access Journals (Sweden)

    Mohd Usama

    2017-11-01

    Full Text Available At present, big data is very popular, because it has proved to be much successful in many fields such as social media, E-commerce transactions, etc. Big data describes the tools and technologies needed to capture, manage, store, distribute, and analyze petabyte or larger-sized datasets having different structures with high speed. Big data can be structured, unstructured, or semi structured. Hadoop is an open source framework that is used to process large amounts of data in an inexpensive and efficient way, and job scheduling is a key factor for achieving high performance in big data processing. This paper gives an overview of big data and highlights the problems and challenges in big data. It then highlights Hadoop Distributed File System (HDFS, Hadoop MapReduce, and various parameters that affect the performance of job scheduling algorithms in big data such as Job Tracker, Task Tracker, Name Node, Data Node, etc. The primary purpose of this paper is to present a comparative study of job scheduling algorithms along with their experimental results in Hadoop environment. In addition, this paper describes the advantages, disadvantages, features, and drawbacks of various Hadoop job schedulers such as FIFO, Fair, capacity, Deadline Constraints, Delay, LATE, Resource Aware, etc, and provides a comparative study among these schedulers.

  1. Optimal Scheduling of a Multi-Carrier Energy Hub Supplemented By Battery Energy Storage Systems

    DEFF Research Database (Denmark)

    Javadi, Mohammad Sadegh; Anvari-Moghaddam, Amjad; Guerrero, Josep M.

    2017-01-01

    This paper introduces a management model for optimal scheduling of a multi-carrier energy hub. In the proposed hub, three types of assets are considered: dispersed generating systems (DGs) such as micro-combined heat and power (mCHP) units, storage devices such as battery-based electrical storage...... systems (ESSs), and heating/cooling devices such as electrical heater, heat-pumps and absorption chillers. The optimal scheduling and management of the examined energy hub assets in line with electrical transactions with distribution network is modeled as a mixed-integer non-linear optimization problem....... In this regard, optimal operating points of DG units as well as ESSs are calculated based on a cost-effective strategy. Degradation cost of ESSs is also taken into consideration for short-term scheduling. Simulation results demonstrate that including well-planned energy storage options together with optimal...

  2. Mission Operations Planning and Scheduling System (MOPSS)

    Science.gov (United States)

    Wood, Terri; Hempel, Paul

    2011-01-01

    MOPSS is a generic framework that can be configured on the fly to support a wide range of planning and scheduling applications. It is currently used to support seven missions at Goddard Space Flight Center (GSFC) in roles that include science planning, mission planning, and real-time control. Prior to MOPSS, each spacecraft project built its own planning and scheduling capability to plan satellite activities and communications and to create the commands to be uplinked to the spacecraft. This approach required creating a data repository for storing planning and scheduling information, building user interfaces to display data, generating needed scheduling algorithms, and implementing customized external interfaces. Complex scheduling problems that involved reacting to multiple variable situations were analyzed manually. Operators then used the results to add commands to the schedule. Each architecture was unique to specific satellite requirements. MOPSS is an expert system that automates mission operations and frees the flight operations team to concentrate on critical activities. It is easily reconfigured by the flight operations team as the mission evolves. The heart of the system is a custom object-oriented data layer mapped onto an Oracle relational database. The combination of these two technologies allows a user or system engineer to capture any type of scheduling or planning data in the system's generic data storage via a GUI.

  3. Transmission Scheduling and Routing Algorithms for Delay Tolerant Networks

    Science.gov (United States)

    Dudukovich, Rachel; Raible, Daniel E.

    2016-01-01

    The challenges of data processing, transmission scheduling and routing within a space network present a multi-criteria optimization problem. Long delays, intermittent connectivity, asymmetric data rates and potentially high error rates make traditional networking approaches unsuitable. The delay tolerant networking architecture and protocols attempt to mitigate many of these issues, yet transmission scheduling is largely manually configured and routes are determined by a static contact routing graph. A high level of variability exists among the requirements and environmental characteristics of different missions, some of which may allow for the use of more opportunistic routing methods. In all cases, resource allocation and constraints must be balanced with the optimization of data throughput and quality of service. Much work has been done researching routing techniques for terrestrial-based challenged networks in an attempt to optimize contact opportunities and resource usage. This paper examines several popular methods to determine their potential applicability to space networks.

  4. Profit-based conventional resource scheduling with renewable energy penetration

    Science.gov (United States)

    Reddy, K. Srikanth; Panwar, Lokesh Kumar; Kumar, Rajesh; Panigrahi, B. K.

    2017-08-01

    Technological breakthroughs in renewable energy technologies (RETs) enabled them to attain grid parity thereby making them potential contenders for existing conventional resources. To examine the market participation of RETs, this paper formulates a scheduling problem accommodating energy market participation of wind- and solar-independent power producers (IPPs) treating both conventional and RETs as identical entities. Furthermore, constraints pertaining to penetration and curtailments of RETs are restructured. Additionally, an appropriate objective function for profit incurred by conventional resource IPPs through reserve market participation as a function of renewable energy curtailment is also proposed. The proposed concept is simulated with a test system comprising 10 conventional generation units in conjunction with solar photovoltaic (SPV) and wind energy generators (WEG). The simulation results indicate that renewable energy integration and its curtailment limits influence the market participation or scheduling strategies of conventional resources in both energy and reserve markets. Furthermore, load and reliability parameters are also affected.

  5. Post LS1 schedule

    CERN Document Server

    Lamont, M

    2014-01-01

    The scheduling limits for a typical long year taking into account technical stops, machine development, spe- cial physics runs are presented. An attempt is then made to outline a ten year post LS1 schedule taking into account the disparate requirements outlined in the previous talks in this session. The demands on the planned long shutdowns and the impact of these demands on their proposed length will be discussed. The option of using ion running as a pre-shutdown cool-down period will be addressed.

  6. Staffing, overtime, and shift scheduling project

    International Nuclear Information System (INIS)

    Lewis, P.M.

    1989-01-01

    Recent events at the Peach Bottom nuclear power plant have demonstrated the need to establish a quantifiable basis for assessing the safety significance of long work hours on nuclear power plant operators. The incidents at TMI-2, Chernobyl, and Bhopal, which all occurred during the late evening/night shift, further highlight the importance of the relationship between shift scheduling and performance. The objective of this project is to estimate, using statistical analysis on data from the nuclear industry, the effects on safety of staffing levels, overtime, and shift scheduling for operators and maintenance personnel. Regarding staffing levels, the Nuclear Regulatory Commission (NRC) currently has no explicit regulation concerning the minimum acceptable levels of staffing in a plant that has an operating license. The NRC has no systematic method for collecting data on the number of licensed operators on the operating crews. In 1982 the NRC recommended that plants write into their technical specifications a model policy on overtime. Currently, 77 nuclear power plant units have the model policy or a modification of it written into their technical specifications; 33 units have no policy on overtime. The model policy sets limits on overtime for safety related personnel, although these limits can be exceeded with plant manger approval. The US nuclear power industry has three types of shift schedules: (1) forward-rotating 8-hour/day shift schedules, (2) backward-rotating 8-hour/day schedules, and (3) 12-hour/day schedules

  7. Realistic Scheduling Mechanism for Smart Homes

    Directory of Open Access Journals (Sweden)

    Danish Mahmood

    2016-03-01

    Full Text Available In this work, we propose a Realistic Scheduling Mechanism (RSM to reduce user frustration and enhance appliance utility by classifying appliances with respective constraints and their time of use effectively. Algorithms are proposed regarding functioning of home appliances. A 24 hour time slot is divided into four logical sub-time slots, each composed of 360 min or 6 h. In these sub-time slots, only desired appliances (with respect to appliance classification are scheduled to raise appliance utility, restricting power consumption by a dynamically modelled power usage limiter that does not only take the electricity consumer into account but also the electricity supplier. Once appliance, time and power usage limiter modelling is done, we use a nature-inspired heuristic algorithm, Binary Particle Swarm Optimization (BPSO, optimally to form schedules with given constraints representing each sub-time slot. These schedules tend to achieve an equilibrium amongst appliance utility and cost effectiveness. For validation of the proposed RSM, we provide a comparative analysis amongst unscheduled electrical load usage, scheduled directly by BPSO and RSM, reflecting user comfort, which is based upon cost effectiveness and appliance utility.

  8. Examining Inequities in Teacher Pension Benefits

    Science.gov (United States)

    Shuls, James V.

    2017-01-01

    From funding to teacher quality, inequities exist between school districts. This paper adds to the literature on inequities by examining the impact of pension plan formulas on pension benefits. Using data from the salary schedules of 464 Missouri school districts, this paper analyzes how various final average salary calculations would impact the…

  9. Scheduling Network Traffic for Grid Purposes

    DEFF Research Database (Denmark)

    Gamst, Mette

    This thesis concerns scheduling of network traffic in grid context. Grid computing consists of a number of geographically distributed computers, which work together for solving large problems. The computers are connected through a network. When scheduling job execution in grid computing, data...... transmission has so far not been taken into account. This causes stability problems, because data transmission takes time and thus causes delays to the execution plan. This thesis proposes the integration of job scheduling and network routing. The scientific contribution is based on methods from operations...... research and consists of six papers. The first four considers data transmission in grid context. The last two solves the data transmission problem, where the number of paths per data connection is bounded from above. The thesis shows that it is possible to solve the integrated job scheduling and network...

  10. Scheduling job shop - A case study

    Science.gov (United States)

    Abas, M.; Abbas, A.; Khan, W. A.

    2016-08-01

    The scheduling in job shop is important for efficient utilization of machines in the manufacturing industry. There are number of algorithms available for scheduling of jobs which depend on machines tools, indirect consumables and jobs which are to be processed. In this paper a case study is presented for scheduling of jobs when parts are treated on available machines. Through time and motion study setup time and operation time are measured as total processing time for variety of products having different manufacturing processes. Based on due dates different level of priority are assigned to the jobs and the jobs are scheduled on the basis of priority. In view of the measured processing time, the times for processing of some new jobs are estimated and for efficient utilization of the machines available an algorithm is proposed and validated.

  11. Modeling the Cray memory scheduler

    Energy Technology Data Exchange (ETDEWEB)

    Wickham, K.L.; Litteer, G.L.

    1992-04-01

    This report documents the results of a project to evaluate low cost modeling and simulation tools when applied to modeling the Cray memory scheduler. The specific tool used is described and the basics of the memory scheduler are covered. Results of simulations using the model are discussed and a favorable recommendation is made to make more use of this inexpensive technology.

  12. Prioritizing Sleep Health: Public Health Policy Recommendations.

    Science.gov (United States)

    Barnes, Christopher M; Drake, Christopher L

    2015-11-01

    The schedules that Americans live by are not consistent with healthy sleep patterns. In addition, poor access to educational and treatment aids for sleep leaves people engaging in behavior that is harmful to sleep and forgoing treatment for sleep disorders. This has created a sleep crisis that is a public health issue with broad implications for cognitive outcomes, mental health, physical health, work performance, and safety. New public policies should be formulated to address these issues. We draw from the scientific literature to recommend the following: establishing national standards for middle and high school start times that are later in the day, stronger regulation of work hours and schedules, eliminating daylight saving time, educating the public regarding the impact of electronic media on sleep, and improving access to ambulatory in-home diagnostic testing for sleep disorders. © The Author(s) 2015.

  13. A new typology of work schedules: Evidence from a cross-sectional study among nurses working in residential elder care.

    Science.gov (United States)

    Peters, V; de Rijk, A; Engels, J; Heerkens, Y; Nijhuis, F

    2016-04-07

    Work schedules contribute substantially to the health and well-being of nurses. Too broad typologies are used in research that do not meet the current variety in work schedules. To develop a new typology for nurses' work schedules based on five requirements and to validate the typology. This study is based on a questionnaire returned by 498 nurses (response 51%) including questions regarding nurses' work schedule, socio-demographic, and family characteristics and their appraisal of the work schedule. Frequencies of the different schedules were computed to determine the typology. To validate the typology, differences between the types were tested with ANOVAs, Chi2 and Kruskal-Wallis tests. Five main types can be distinguished based on predetermined requirements and frequencies, namely: (1) fixed early shift, (2) rotating two shift pattern without night shift, (3) rotating three shift pattern, (4) fixed and rotating two shift pattern including night shift, and (5) fixed normal day or afternoon shifts. Nurses in these types of work schedule differed significantly with respect to hours worked, days off between shifts, age, education, years in the job, commuting time, contribution to household income, satisfaction with work schedule and work schedule control. Especially nurses with type 3 schedules differed from other types. A typology of five main types of work schedules is proposed. Content validity of the typology is sufficient and the new typology seems useful for research on work-related aspects of nursing.

  14. Robust Optimization for Household Load Scheduling with Uncertain Parameters

    Directory of Open Access Journals (Sweden)

    Jidong Wang

    2018-04-01

    Full Text Available Home energy management systems (HEMS face many challenges of uncertainty, which have a great impact on the scheduling of home appliances. To handle the uncertain parameters in the household load scheduling problem, this paper uses a robust optimization method to rebuild the household load scheduling model for home energy management. The model proposed in this paper can provide the complete robust schedules for customers while considering the disturbance of uncertain parameters. The complete robust schedules can not only guarantee the customers’ comfort constraints but also cooperatively schedule the electric devices for cost minimization and load shifting. Moreover, it is available for customers to obtain multiple schedules through setting different robust levels while considering the trade-off between the comfort and economy.

  15. The robust schedule - A link to improved workflow

    DEFF Research Database (Denmark)

    Lindhard, Søren; Wandahl, Søren

    2012-01-01

    -down the contractors, and force them to rigorously adhere to the initial schedule. If delayed the work-pace or manpower has to be increased to observe the schedule. In attempt to improve productivity three independent site-mangers have been interviewed about time-scheduling. Their experiences and opinions have been...... analyzed and weaknesses in existing time scheduling have been found. The findings showed a negative side effect of keeping the schedule to tight. A too tight schedule is inflexible and cannot absorb variability in production. Flexibility is necessary because of the contractors interacting and dependable....... The result is a chaotic, complex and uncontrolled construction site. Furthermore, strict time limits entail the workflow to be optimized under non-optimal conditions. Even though productivity seems to be increasing, productivity per man-hour is decreasing resulting in increased cost. To increase productivity...

  16. Sexual and gender minority's social media user characteristics: Examining preferred health information.

    Science.gov (United States)

    Park, Hyojung; Rodgers, Shelly; McElroy, Jane A; Everett, Kevin

    2018-01-01

    The authors examined the influence of social media involvement on health issues in sexual and gender minorities (SGMs). Demographic and technological characteristics of social media users and nonusers were identified, and the influence of social media involvement on these factors was assessed for its potential to influence health information needs and preferences. A survey of 2,274 SGM individuals revealed that age, sexual orientation, number of Internet access points, and use of smartphones predicted levels of social media involvement. Results suggest that a broader range of traditional and nontraditional communication channels is needed to meet a diversity of health information needs in SGMs.

  17. The scheduling of repeat cesarean section operations: prospective management protocol experience.

    Science.gov (United States)

    Read, J A

    1985-03-01

    There are benefits to patients and a busy obstetric service if repeat cesarean section operations are performed on a scheduled basis. Optimum management avoids prematurity and reduces the need for amniocentesis. Over a period of 20 months repeat cesarean sections were performed at Tripler Army Medical Center while a protocol with the following elements was used: (1) known last menstrual period; (2) landmarks: positive urine human chorionic gonadotropin test by 6 weeks, Doppler fetal heart tone by 12 weeks, date determination by examination before 10 weeks, fetoscope fetal heart tone by 20 weeks, and date determination by size before 30 weeks; (3) date determination by midtrimester sonogram(s); (4) normal third-trimester glucose screening; (5) biparietal diameter of 9.2 or 9.5 cm before scheduling. With two or more clinical landmarks and one date by sonogram or one landmark and date by two sonograms, elective repeat cesarean section was scheduled at 39 weeks if the biparietal diameter was greater than or equal to 9.2 cm (127). If dates by sonogram were less than dates by last menstrual period but greater than 1 week or if last menstrual period was unknown, dates by sonogram and landmarks corresponding to dates by sonogram were used to electively schedule, with biparietal diameters of 9.2 or 9.5 cm respectively required (28). If protocol criteria were not met or earlier delivery was indicated (e.g., vertical scar or diabetes), amniocentesis was performed (42), except when not possible, advisable, or refused when patients either elected labor (20) or were scheduled if three or more criteria for 40+ weeks were met (18). Of 225 patients (70.5%) scheduled by protocol (173), amniocentesis (34), or medical indication (18), 188 (58.9%) were delivered without labor. In the 147 patients (46.1%) delivered electively by protocol without labor or amniocentesis, there were no cases of respiratory distress syndrome and the mean birth weight was 3517 gm. With early care and better

  18. Planning construction of integrative schedule management for nuclear power project

    International Nuclear Information System (INIS)

    Zeng Zhenglin; Wang Wenying; Peng Fei

    2012-01-01

    This paper introduces the planning construction of integrative schedule management for Nuclear Power Project. It details schedule management system and the requirement of schedulers and the mode of three schedule management flats. And analysis it combing with the implementation of construction water and all special schedules before FCD to further propose the improving and researching direction for the integrative schedule management. (authors)

  19. Spent nuclear fuel project integrated schedule plan

    International Nuclear Information System (INIS)

    Squires, K.G.

    1995-01-01

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel

  20. Spent nuclear fuel project integrated schedule plan

    Energy Technology Data Exchange (ETDEWEB)

    Squires, K.G.

    1995-03-06

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel.

  1. Adoption and Use of Internet Technologies in Health Communication: Examining Disparities in Diffusion Patterns, Health Information Sources, and Patient-Provider Encounters

    Science.gov (United States)

    Massey, Philip Minter

    2013-01-01

    This dissertation examines the impact of internet technologies on the field of health communication. Access and use of health communication technologies has and will continue to become increasingly important to manage and treat chronic conditions and other ailments, particularly in the context of health care reform that promotes improved quality…

  2. Effectiveness of Time-Based Attention Schedules on Students in Inclusive Classrooms in Turkey

    Science.gov (United States)

    Sazak Pinar, Elif

    2015-01-01

    This study examines the effectiveness of fixed-time (FT) and variable-time (VT) schedules and attention on the problem behaviors and on-task behaviors of students with and without intellectual disabilities in inclusive classrooms in Turkey. Three second-grade students with intellectual disabilities, three students without intellectual…

  3. Agent-based scheduling for aircraft deicing

    NARCIS (Netherlands)

    Mao, X.; Ter Mors, A.W.; Roos, N.; Witteveen, C.

    2006-01-01

    The planning and scheduling of the deicing and anti-icing activities is an important and challenging part of airport departure planning. Deicing planning has to be done in a highly dynamic environment involving several autonomous and self-interested parties. Traditional centralized scheduling

  4. Job characteristics in relation to the prevalence of myocardial infarction in the US Health Examination Survey (HES) and the Health and Nutrition Examination Survey (HANES).

    Science.gov (United States)

    Karasek, R A; Theorell, T; Schwartz, J E; Schnall, P L; Pieper, C F; Michela, J L

    1988-08-01

    Associations between psychosocial job characteristics and past myocardial infarction (MI) prevalence for employed males were tested with the Health Examination Survey (HES) 1960-61, N = 2,409, and the Health and Nutrition Examination Survey (HANES) 1971-75, N = 2,424. A new estimation method is used which imputes to census occupation codes, job characteristic information from national surveys of job characteristics (US Department of Labor, Quality of Employment Surveys). Controlling for age, we find that employed males with jobs which are simultaneously low in decision latitude and high in psychological work load (a multiplicative product term isolating 20 per cent of the population) have a higher prevalence of myocardial infarction in both data bases. In a logistic regression analysis, using job measures adjusted for demographic factors and controlling for age, race, education, systolic blood pressure, serum cholesterol, smoking (HANES only), and physical exertion, we find a low decision latitude/high psychological demand multiplicative product term associated with MI in both data bases. Additional multiple logistic regressions show that low decision latitude is associated with increased prevalence of MI in both the HES and the HANES. Psychological workload and physical exertion are significant only in the HANES.

  5. PROMSYS, Plant Equipment Maintenance and Inspection Scheduling

    International Nuclear Information System (INIS)

    Morgan, D.L.; Srite, B.E.

    1986-01-01

    1 - Description of problem or function: PROMSYS is a computer system designed to automate the scheduling of routine maintenance and inspection of plant equipment. This 'programmed maintenance' provides the detailed planning and accomplishment of lubrication, inspection, and similar repetitive maintenance activities which can be scheduled at specified predetermined intervals throughout the year. The equipment items included are the typical pumps, blowers, motors, compressors, automotive equipment, refrigeration units, filtering systems, machine shop equipment, cranes, elevators, motor-generator sets, and electrical switchgear found throughout industry, as well as cell ventilation, shielding, containment, and material handling equipment unique to nuclear research and development facilities. Four related programs are used to produce sorted schedule lists, delinquent work lists, and optional master lists. Five additional programs are used to create and maintain records of all scheduled and unscheduled maintenance history. 2 - Method of solution: Service specifications and frequency are established and stored. The computer program reviews schedules weekly and prints, on schedule cards, instructions for service that is due the following week. The basic output from the computer program comes in two forms: programmed-maintenance schedule cards and programmed-maintenance data sheets. The data sheets can be issued in numerical building, route, and location number sequence as equipment lists, grouped for work assigned to a particular foreman as the foreman's equipment list, or grouped by work charged to a particular work order as the work-order list. Data sheets grouped by equipment classification are called the equipment classification list

  6. The 2016 Lifetime Immunization Schedule, approved by the Italian scientific societies: A new paradigm to promote vaccination at all ages.

    Science.gov (United States)

    Bonanni, Paolo; Chiamenti, Giampietro; Conforti, Giorgio; Maio, Tommasa; Odone, Anna; Russo, Rocco; Scotti, Silvestro; Signorelli, Carlo; Villani, Alberto

    2017-11-02

    Medical scientific societies have the core mission of producing, pooling and disseminating solid and updated scientific information. We report the successful experience of the partnership of four national Medical Scientific Societies active in Italy in producing scientific advice on vaccines and vaccination. In particular, i) the Italian Society of Hygiene, Preventive Medicine and Public Health; SitI, ii) the Italian Society of Paediatrics; SIP, iii) the "Italian Federation of General Practitioners"; FIMP, and iv) the Italian Federation of General Medicine FIMMG) have worked together since 2012 to produce shared evidence-based recommendations on vaccination schedules, namely the "Lifetime Immunization Schedule" which introduced for the first time in Italy a life-course approach to vaccination. The 2014 edition of the "Lifetime Immunization Schedule" was used as a basis to develop the 2017-2019 Italian National Prevention Plan, approved by The Italian Ministry of Health in February 2017. In this report, we present the structure, content and supporting evidence of the new 2016 "Lifetime Immunization Schedule" and we expand on the influential role of medical scientific societies in researching and advocating for effective and safe vaccination programmes' implementation at the national level.

  7. Unifying practice schedules in the timescales of motor learning and performance.

    Science.gov (United States)

    Verhoeven, F Martijn; Newell, Karl M

    2018-06-01

    In this article, we elaborate from a multiple time scales model of motor learning to examine the independent and integrated effects of massed and distributed practice schedules within- and between-sessions on the persistent (learning) and transient (warm-up, fatigue) processes of performance change. The timescales framework reveals the influence of practice distribution on four learning-related processes: the persistent processes of learning and forgetting, and the transient processes of warm-up decrement and fatigue. The superposition of the different processes of practice leads to a unified set of effects for massed and distributed practice within- and between-sessions in learning motor tasks. This analysis of the interaction between the duration of the interval of practice trials or sessions and parameters of the introduced time scale model captures the unified influence of the between trial and session scheduling of practice on learning and performance. It provides a starting point for new theoretically based hypotheses, and the scheduling of practice that minimizes the negative effects of warm-up decrement, fatigue and forgetting while exploiting the positive effects of learning and retention. Copyright © 2018 Elsevier B.V. All rights reserved.

  8. Multiple physical healthcare needs among outpatients with schizophrenia: findings from a health examination study.

    Science.gov (United States)

    Eskelinen, Saana; Sailas, Eila; Joutsenniemi, Kaisla; Holi, Matti; Koskela, Tuomas H; Suvisaari, Jaana

    2017-08-01

    Despite the abundant literature on physical comorbidity, the full range of the concurrent somatic healthcare needs among individuals with schizophrenia has rarely been studied. This observational study aimed to assess the distressing somatic symptoms and needs for physical health interventions in outpatients with schizophrenia, and factors predicting those needs. A structured, comprehensive health examination was carried out, including a visit to a nurse and a general practitioner on 275 outpatients with schizophrenia. The required interventions were classified by type of disease. Logistic regression was used to assess the influence of sociodemographic factors, lifestyle, functional limitations, factors related to psychiatric disorder, and healthcare use on the need for interventions. In total, 44.9% of the patients (mean age 44.9 years) reported somatic symptoms affecting daily life; 87.6% needed specific interventions for a disease or condition, most commonly for cardiovascular, dermatological, dental, ophthalmological, and gastrointestinal conditions, and for altered glucose homeostasis. Smoking and obesity predicted significantly a need of any intervention, but the predictors varied in each disease category. Strikingly, use of general practitioner services during the previous year did not reduce the need for interventions. Health examinations for outpatients with schizophrenia revealed numerous physical healthcare needs. The health examinations for patients with schizophrenia should contain a medical history taking and a physical examination, in addition to basic measurements and laboratory tests. Prevention and treatment of obesity and smoking should be given priority in order to diminish somatic comorbidities in schizophrenia.

  9. Integrated multi-resource planning and scheduling in engineering project

    Directory of Open Access Journals (Sweden)

    Samer Ben Issa

    2017-01-01

    Full Text Available Planning and scheduling processes in project management are carried out sequentially in prac-tice, i.e. planning project activities first without visibility of resource limitation, and then schedul-ing the project according to these pre-planned activities. This is a need to integrate these two pro-cesses. In this paper, we use Branch and Bound approach for generating all the feasible and non-feasible project schedules with/without activity splitting, and with a new criterion called “the Minimum Moments of Resources Required around X-Y axes (MMORR”, we select the best feasible project schedule to integrate plan processing and schedule processing for engineering projects. The results illustrate that this integrated approach can effectively select the best feasible project schedule among alternatives, improves the resource utilization, and shortens the project lead time.

  10. A Profile of Puerto Rican Health in the United States: Data from the Hispanic Health and Nutrition Examination Survey 1982-84.

    Science.gov (United States)

    Munoz, Eric; And Others

    The health conditions and health status of Hispanic Americans will assume increased importance as their population increases. The goal of this book of charts is to present data from the Hispanic Health and Nutrition Examination Survey (HHANES) on Puerto Ricans. The Puerto Rican HHANES sampling procedure is a multi-stage probability sample of…

  11. Diverse task scheduling for individualized requirements in cloud manufacturing

    Science.gov (United States)

    Zhou, Longfei; Zhang, Lin; Zhao, Chun; Laili, Yuanjun; Xu, Lida

    2018-03-01

    Cloud manufacturing (CMfg) has emerged as a new manufacturing paradigm that provides ubiquitous, on-demand manufacturing services to customers through network and CMfg platforms. In CMfg system, task scheduling as an important means of finding suitable services for specific manufacturing tasks plays a key role in enhancing the system performance. Customers' requirements in CMfg are highly individualized, which leads to diverse manufacturing tasks in terms of execution flows and users' preferences. We focus on diverse manufacturing tasks and aim to address their scheduling issue in CMfg. First of all, a mathematical model of task scheduling is built based on analysis of the scheduling process in CMfg. To solve this scheduling problem, we propose a scheduling method aiming for diverse tasks, which enables each service demander to obtain desired manufacturing services. The candidate service sets are generated according to subtask directed graphs. An improved genetic algorithm is applied to searching for optimal task scheduling solutions. The effectiveness of the scheduling method proposed is verified by a case study with individualized customers' requirements. The results indicate that the proposed task scheduling method is able to achieve better performance than some usual algorithms such as simulated annealing and pattern search.

  12. Bisphenol-A and Sleep Adequacy among Adults in the National Health and Nutrition Examination Surveys

    Science.gov (United States)

    Beydoun, Hind A.; Beydoun, May A.; Jeng, Hueiwang Anna; Zonderman, Alan B.; Eid, Shaker M.

    2016-01-01

    Study Objectives: To evaluate bisphenol-A (BPA) level and its relationship to sleep adequacy in a nationally representative sample of U.S. adults. Methods: A population-based cross-sectional study was conducted using 2005–2010 National Health and Nutrition Examination Survey whereby data were collected using in-person interviews, physical examination and laboratory testing. BPA level was measured in urine samples and analyzed as loge-transformed variable and in quartiles ( 8 h); (Bisphenol-A and sleep adequacy among adults in the National Health and Nutrition Examination Surveys. SLEEP 2016;39(2):467–476. PMID:26446109

  13. Developing a new method for modifying over-allocated multi-mode resource constraint schedules in the presence of preemptive resources

    Directory of Open Access Journals (Sweden)

    Aidin Delgoshaei

    2016-09-01

    Full Text Available The issue of resource over-allocating is a big concern for project engineers in the process of scheduling project activities. Resource over-allocating is frequently seen after initial scheduling of a project in practice and causes significant amount of efforts to modify the initial schedules. In this research, a new method is developed for modifying over-allocated schedules in a multi-mode resource constrained project scheduling problems (MRCPSPs with positive cash flows (MRCPSP-PCF. The aim is to maximize profit of the MRCPSPs or logically minimizing costs. The proposed method can be used as a macro in Microsoft Office Project® Software to modify resource over-allocated days after scheduling a project. This research considers progress payment method and preemptive resources. The proposed approach maximizes profit by scheduling activities through the resource calendar respecting to the available level of preemptive resources and activity numbers. To examine the performance of the proposed method a number of experiments derived from the literature are solved. The results are then compared with the circumstances where resource constraints are relaxed. The outcomes show that in all studied cases, the proposed algorithm can provide modified schedules with no over-allocated days. Afterward the method is applied to modify a manufacturing project in practice.

  14. Schedules of controlled substances: temporary placement of three synthetic cannabinoids into Schedule I. Final order.

    Science.gov (United States)

    2013-05-16

    The Deputy Administrator of the Drug Enforcement Administration (DEA) is issuing this final order to temporarily schedule three synthetic cannabinoids under the Controlled Substances Act (CSA) pursuant to the temporary scheduling provisions of 21 U.S.C. 811(h). The substances are (1-pentyl-1H-indol-3-yl)(2,2,3,3-tetramethylcyclopropyl)methanone (UR-144), [1-(5-fluoro-pentyl)-1H-indol-3-yl](2,2,3,3-tetramethylcyclopropyl)methanone (5-fluoro-UR-144, XLR11) and N-(1-adamantyl)-1-pentyl-1H-indazole-3-carboxamide (APINACA, AKB48). This action is based on a finding by the Deputy Administrator that the placement of these synthetic cannabinoids and their salts, isomers and salts of isomers into Schedule I of the CSA is necessary to avoid an imminent hazard to the public safety. As a result of this order, the full effect of the CSA and the Controlled Substances Import and Export Act (CSIEA) and their implementing regulations including criminal, civil and administrative penalties, sanctions and regulatory controls of Schedule I substances will be imposed on the manufacture, distribution, possession, importation, and exportation of these synthetic cannabinoids.

  15. Interoceanic canal excavation scheduling via computer simulation

    Energy Technology Data Exchange (ETDEWEB)

    Baldonado, Orlino C [Holmes and Narver, Inc., Los Angeles, CA (United States)

    1970-05-15

    The computer simulation language GPSS/360 was used to simulate the schedule of several nuclear detonation programs for the interoceanic canal project. The effects of using different weather restriction categories due to air blast and fallout were investigated. The effect of increasing the number of emplacement and stemming crews and the effect of varying the reentry period after detonating a row charge or salvo were also studied. Detonation programs were simulated for the proposed Routes 17A and 25E. The study demonstrates the method of using computer simulation so that a schedule and its associated constraints can be assessed for feasibility. Since many simulation runs can be made for a given set of detonation program constraints, one readily obtains an average schedule for a range of conditions. This provides a method for analyzing time-sensitive operations so that time and cost-effective operational schedules can be established. A comparison of the simulated schedules with those that were published shows them to be similar. (author)

  16. Interoceanic canal excavation scheduling via computer simulation

    International Nuclear Information System (INIS)

    Baldonado, Orlino C.

    1970-01-01

    The computer simulation language GPSS/360 was used to simulate the schedule of several nuclear detonation programs for the interoceanic canal project. The effects of using different weather restriction categories due to air blast and fallout were investigated. The effect of increasing the number of emplacement and stemming crews and the effect of varying the reentry period after detonating a row charge or salvo were also studied. Detonation programs were simulated for the proposed Routes 17A and 25E. The study demonstrates the method of using computer simulation so that a schedule and its associated constraints can be assessed for feasibility. Since many simulation runs can be made for a given set of detonation program constraints, one readily obtains an average schedule for a range of conditions. This provides a method for analyzing time-sensitive operations so that time and cost-effective operational schedules can be established. A comparison of the simulated schedules with those that were published shows them to be similar. (author)

  17. 46 CFR 525.2 - Terminal schedules.

    Science.gov (United States)

    2010-10-01

    ... domestic law and international conventions and agreements adopted by the United States; such terminal... their own negligence, or that impose upon others the obligation to indemnify or hold-harmless the terminals from liability for their own negligence. (2) Enforcement of terminal schedules. Any schedule that...

  18. Robust scheduling in an uncertain environment

    NARCIS (Netherlands)

    Wilson, M.

    2016-01-01

    This thesis presents research on scheduling in an uncertain environment, which forms a part of the rolling stock life cycle logistics applied research and development program funded by Dutch railway industry companies. The focus therefore lies on scheduling of maintenance operations on rolling stock

  19. 76 FR 11187 - Examinations of Work Areas in Underground Coal Mines for Violations of Mandatory Health or Safety...

    Science.gov (United States)

    2011-03-01

    ... DEPARTMENT OF LABOR Mine Safety and Health Administration 30 CFR Part 75 RIN 1219-AB75 Examinations of Work Areas in Underground Coal Mines for Violations of Mandatory Health or Safety Standards... rule addressing Examinations of Work Areas in Underground Coal Mines for Violations of Mandatory Health...

  20. Solving project scheduling problems by minimum cut computations

    NARCIS (Netherlands)

    Möhring, R.H.; Schulz, A.S.; Stork, F.; Uetz, Marc Jochen

    In project scheduling, a set of precedence-constrained jobs has to be scheduled so as to minimize a given objective. In resource-constrained project scheduling, the jobs additionally compete for scarce resources. Due to its universality, the latter problem has a variety of applications in

  1. ABCC-JNIH Adult Health Study. Report 3. 1958-1960 cycle of examinations, Hiroshima

    Energy Technology Data Exchange (ETDEWEB)

    Finch, S C; Anderson, Jr, P S

    1963-10-29

    Results of 10,368 examinations of participants in the ABCC-JNIH Adult Health Study, Hiroshima, were tabulated and discussed. About 82% of the entire sample was examined at least once during the 1958-60 cycle. Physical and laboratory findings as well as major diagnoses were considered by comparison group, age, and sex. 8 references, 7 figures, 13 tables.

  2. Optimal investment and scheduling of distributed energy resources with uncertainty in electric vehicle driving schedules

    International Nuclear Information System (INIS)

    Cardoso, G.; Stadler, M.; Bozchalui, M.C.; Sharma, R.; Marnay, C.; Barbosa-Póvoa, A.; Ferrão, P.

    2014-01-01

    The large scale penetration of electric vehicles (EVs) will introduce technical challenges to the distribution grid, but also carries the potential for vehicle-to-grid services. Namely, if available in large enough numbers, EVs can be used as a distributed energy resource (DER) and their presence can influence optimal DER investment and scheduling decisions in microgrids. In this work, a novel EV fleet aggregator model is introduced in a stochastic formulation of DER-CAM [1], an optimization tool used to address DER investment and scheduling problems. This is used to assess the impact of EV interconnections on optimal DER solutions considering uncertainty in EV driving schedules. Optimization results indicate that EVs can have a significant impact on DER investments, particularly if considering short payback periods. Furthermore, results suggest that uncertainty in driving schedules carries little significance to total energy costs, which is corroborated by results obtained using the stochastic formulation of the problem. - Highlights: • This paper introduces a new EV aggregator model in the DER-CAM model and expands it with a stochastic formulation. • The model is used to analyze the impact of EVs in DER investment decisions in a large office building. • The uncertainty in EV driving patterns is considered through scenarios based on data from a daily commute driving survey. • Results indicate that EVs have a significant impact in optimal DER decisions, particularly when looking at short payback periods. • Furthermore, results indicate that uncertainty in EV driving schedules has little impact on DER investment decisions

  3. Designing of vague logic based multilevel feedback queue scheduler

    Directory of Open Access Journals (Sweden)

    Supriya Raheja

    2016-03-01

    Full Text Available Multilevel feedback queue scheduler suffers from major issues of scheduling such as starvation for long tasks, fixed number of queues, and static length of time quantum in each queue. These factors directly affect the performance of the scheduler. At many times impreciseness exists in attributes of tasks which make the performance even worse. In this paper, our intent is to improve the performance by providing a solution to these issues. We design a multilevel feedback queue scheduler using a vague set which we call as VMLFQ scheduler. VMLFQ scheduler intelligently handles the impreciseness and defines the optimum number of queues as well as the optimal size of time quantum for each queue. It also resolves the problem of starvation. This paper simulates and analyzes the performance of VMLFQ scheduler with the other multilevel feedback queue techniques using MatLab.

  4. 76 FR 28194 - Proposed FOIA Fee Schedule Update

    Science.gov (United States)

    2011-05-16

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 Proposed FOIA Fee Schedule Update AGENCY... publishing its proposed Freedom of Information Act (FOIA) Fee Schedule Update and solicits comments from... on the proposed fee schedule should be mailed or delivered to the Office of the General Counsel...

  5. 75 FR 27228 - Proposed FOIA Fee Schedule Update

    Science.gov (United States)

    2010-05-14

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 Proposed FOIA Fee Schedule Update AGENCY... publishing its proposed Freedom of Information Act (FOIA) Fee Schedule Update and solicits comments from... on the proposed fee schedule should be mailed or delivered to the Office of the General Counsel...

  6. Differences in uptake of immunisations and health examinations among refugee children compared to Danish-born children

    DEFF Research Database (Denmark)

    Moller, Sanne Pagh; Hjern, Anders; Andersen, Anne-Marie Nybo

    2016-01-01

    diphtheria, tetanus, pertussis and polio (HR = 0.50; 95 % confidence interval (CI) 0.48–0.51). Participation in child health examinations was also lower among refugee children with the lowest at the last child health examination at age 5 (HR = 0.48; 95 % CI 0.47–0.50). Adjusting the analysis for parental...

  7. State Public Health Enabling Authorities: Results of a Fundamental Activities Assessment Examining Core and Essential Services

    Science.gov (United States)

    Hoss, Aila; Menon, Akshara; Corso, Liza

    2016-01-01

    Context Public health enabling authorities establish the legal foundation for financing, organizing, and delivering public health services. State laws vary in terms of the content, depth, and breadth of these fundamental public health activities. Given this variance, the Institute of Medicine has identified state public health laws as an area that requires further examination. To respond to this call for further examination, the Centers for Disease Control and Prevention’s Public Health Law Program conducted a fundamental activities legal assessment on state public health laws. Objective The goal of the legal assessment was to examine state laws referencing frameworks representing public health department fundamental activities (ie, core and essential services) in an effort to identify, catalog, and describe enabling authorities of state governmental public health systems. Design In 2013, Public Health Law Program staff compiled a list of state statutes and regulations referencing different commonly-recognized public health frameworks of fundamental activities. The legal assessment included state fundamental activities laws available on WestlawNext as of July 2013. The results related to the 10 essential public health services and the 3 core public health functions were confirmed and updated in June 2016. Results Eighteen states reference commonly-recognized frameworks of fundamental activities in their laws. Thirteen states have listed the 10 essential public health services in their laws. Eight of these states have also referenced the 3 core public health functions in their laws. Five states reference only the core public health functions. Conclusions Several states reference fundamental activities in their state laws, particularly through use of the essential services framework. Further work is needed to capture the public health laws and practices of states that may be performing fundamental activities but without reference to a common framework. PMID

  8. State Public Health Enabling Authorities: Results of a Fundamental Activities Assessment Examining Core and Essential Services.

    Science.gov (United States)

    Hoss, Aila; Menon, Akshara; Corso, Liza

    2016-01-01

    Public health enabling authorities establish the legal foundation for financing, organizing, and delivering public health services. State laws vary in terms of the content, depth, and breadth of these fundamental public health activities. Given this variance, the Institute of Medicine has identified state public health laws as an area that requires further examination. To respond to this call for further examination, the Centers for Disease Control and Prevention's Public Health Law Program conducted a fundamental activities legal assessment on state public health laws. The goal of the legal assessment was to examine state laws referencing frameworks representing public health department fundamental activities (ie, core and essential services) in an effort to identify, catalog, and describe enabling authorities of state governmental public health systems. In 2013, Public Health Law Program staff compiled a list of state statutes and regulations referencing different commonly-recognized public health frameworks of fundamental activities. The legal assessment included state fundamental activities laws available on WestlawNext as of July 2013. The results related to the 10 essential public health services and the 3 core public health functions were confirmed and updated in June 2016. Eighteen states reference commonly-recognized frameworks of fundamental activities in their laws. Thirteen states have listed the 10 essential public health services in their laws. Eight of these states have also referenced the 3 core public health functions in their laws. Five states reference only the core public health functions. Several states reference fundamental activities in their state laws, particularly through use of the essential services framework. Further work is needed to capture the public health laws and practices of states that may be performing fundamental activities but without reference to a common framework.

  9. A decentralized scheduling algorithm for time synchronized channel hopping

    Directory of Open Access Journals (Sweden)

    Andrew Tinka

    2011-09-01

    Full Text Available Time Synchronized Channel Hopping (TSCH is an existing Medium Access Control scheme which enables robust communication through channel hopping and high data rates through synchronization. It is based on a time-slotted architecture, and its correct functioning depends on a schedule which is typically computed by a central node. This paper presents, to our knowledge, the first scheduling algorithm for TSCH networks which both is distributed and which copes with mobile nodes. Two variations on scheduling algorithms are presented. Aloha-based scheduling allocates one channel for broadcasting advertisements for new neighbors. Reservation- based scheduling augments Aloha-based scheduling with a dedicated timeslot for targeted advertisements based on gossip information. A mobile ad hoc motorized sensor network with frequent connectivity changes is studied, and the performance of the two proposed algorithms is assessed. This performance analysis uses both simulation results and the results of a field deployment of floating wireless sensors in an estuarial canal environment. Reservation-based scheduling performs significantly better than Aloha-based scheduling, suggesting that the improved network reactivity is worth the increased algorithmic complexity and resource consumption.

  10. On Coding of Scheduling Information in OFDM

    OpenAIRE

    Gunnarsson, Fredrik; Moosavi, Reza; Eriksson, Jonas; Larsson, Erik G.; Wiberg, Niklas; Frenger, Pål

    2009-01-01

    Control signaling strategies for scheduling information in cellular OFDM systems are studied. A single-cell multiuser system model is formulated that provides system capacity estimates accounting for the signaling overhead. Different scheduling granularities are considered, including the one used in the specifications for the 3G Long Term Evolution (LTE). A greedy scheduling method is assumed, where each resource is assigned to the user for which it can support the highest number of bits. The...

  11. Trustable Virtual Machine Scheduling in a Cloud

    OpenAIRE

    Hermenier , Fabien; Henrio , Ludovic

    2017-01-01

    International audience; In an Infrastructure As A Service (IaaS) cloud, the scheduler deploys VMs to servers according to service level objectives (SLOs). Clients and service providers must both trust the infrastructure. In particular they must be sure that the VM scheduler takes decisions that are consistent with its advertised behaviour. The difficulties to master every theoretical and practical aspects of a VM scheduler implementation leads however to faulty behaviours that break SLOs and ...

  12. Management of Temporal Constraints for Factory Scheduling.

    Science.gov (United States)

    1987-06-01

    consistency of scheduling decisions were implemented in both the ISIS [Fox 84] and SOJA [LePape 85a] scheduling systems. More recent work with the...kinds of time propagation systems: the symbolic and the numeric ones. Symbolic systems combine relationships with a temporal logic a la Allen [Allen 81...maintains consistency by narrowing time windows associated with activities as decisions are made, and SOJA [LePape 85b] guarantees a schedule’s

  13. 7 CFR 305.23 - Steam sterilization treatment schedules.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 5 2010-01-01 2010-01-01 false Steam sterilization treatment schedules. 305.23... Steam sterilization treatment schedules. Treatment schedule Temperature( °F) Pressure Exposure period (minutes) Directions T303-b-1 10 lbs 20 Use 28″ vacuum. Steam sterilization is not practical for treatment...

  14. 77 FR 33980 - Proposed FOIA Fee Schedule Update

    Science.gov (United States)

    2012-06-08

    ... 1703 Proposed FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Notice... the Board's proposed FOIA Fee Schedule Update published in the Federal Register of June 1, 2012. The...: The FOIA requires each Federal agency covered by the Act to specify a schedule of fees applicable to...

  15. Underutilization of Mental Health Services among College Students: An Examination of System-Related Barriers

    Science.gov (United States)

    Marsh, Carey N.; Wilcoxon, S. Allen

    2015-01-01

    Despite the documented benefits of counseling and mental health services on academic performance and degree attainment, only about 10% of psychologically distressed college students ever seek professional help. This investigation examined mental health care system-related barriers that might distinguish help seekers from nonhelp seekers among…

  16. Residency Applicants Prefer Online System for Scheduling Interviews

    Directory of Open Access Journals (Sweden)

    Wills, Charlotte

    2015-03-01

    Full Text Available Introduction: Residency coordinators may be overwhelmed when scheduling residency interviews. Applicants often have to coordinate interviews with multiple programs at once, and relying on verbal or email confirmation may delay the process. Our objective was to determine applicant mean time to schedule and satisfaction using online scheduling. Methods: This pilot study is a retrospective analysis performed on a sample of applicants offered interviews at an urban county emergency medicine residency. Applicants were asked their estimated time to schedule with the online system compared to their average time using other methods. In addition, they were asked on a five-point anchored scale to rate their satisfaction. Results: Of 171 applicants, 121 completed the survey (70.8%. Applicants were scheduling an average of 13.3 interviews. Applicants reported scheduling interviews using the online system in mean of 46.2 minutes (median 10, range 1-1800 from the interview offer as compared with a mean of 320.2 minutes (median 60, range 3-2880 for other programs not using this system. This difference was statistically significant. In addition, applicants were more likely to rate their satisfaction using the online system as “satisfied” (83.5% vs 16.5%. Applicants were also more likely to state that they preferred scheduling their interviews using the online system rather than the way other programs scheduled interviews (74.2% vs 4.1% and that the online system aided them coordinating travel arrangements (52.1% vs 4.1%. Conclusion: An online interview scheduling system is associated with higher satisfaction among applicants both in coordinating travel arrangements and in overall satisfaction. [West J Emerg Med. 2015;16(2:352-354.

  17. Genetic algorithm to solve the problems of lectures and practicums scheduling

    Science.gov (United States)

    Syahputra, M. F.; Apriani, R.; Sawaluddin; Abdullah, D.; Albra, W.; Heikal, M.; Abdurrahman, A.; Khaddafi, M.

    2018-02-01

    Generally, the scheduling process is done manually. However, this method has a low accuracy level, along with possibilities that a scheduled process collides with another scheduled process. When doing theory class and practicum timetable scheduling process, there are numerous problems, such as lecturer teaching schedule collision, schedule collision with another schedule, practicum lesson schedules that collides with theory class, and the number of classrooms available. In this research, genetic algorithm is implemented to perform theory class and practicum timetable scheduling process. The algorithm will be used to process the data containing lists of lecturers, courses, and class rooms, obtained from information technology department at University of Sumatera Utara. The result of scheduling process using genetic algorithm is the most optimal timetable that conforms to available time slots, class rooms, courses, and lecturer schedules.

  18. A dynamic approach to vehicle scheduling

    NARCIS (Netherlands)

    D. Huisman (Dennis); R. Freling (Richard); A.P.M. Wagelmans (Albert)

    2001-01-01

    textabstractThis paper presents a dynamic approach to the vehicle scheduling problem. We discuss the potential benefit of our approach compared to the traditional one, where the vehicle scheduling problem is solved only once for a whole period and the travel times are assumed to be fixed. In our

  19. 21 CFR 1308.13 - Schedule III.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Schedule III. 1308.13 Section 1308.13 Food and... opposite it. (b) Stimulants. Unless specifically excepted or unless listed in another schedule, any... a stimulant effect on the central nervous sxstem, including its salts, isomers (whether optical...

  20. The digital divide: Examining socio-demographic factors associated with health literacy, access and use of internet to seek health information.

    Science.gov (United States)

    Estacio, Emee Vida; Whittle, Rebecca; Protheroe, Joanne

    2017-02-01

    This article aims to examine the socio-demographic characteristics associated with access and use of Internet for health-related purposes and its relationship with health literacy. Data were drawn from a health literacy survey ( N = 1046) and analysed using logistic regression. Results show a strong association between health literacy, internet access and use. Socio-demographic characteristics particularly age, education, income, perceived health and social isolation also predict internet access. Thus, in addition to widening access, the movement towards digitisation of health information and services should also consider digital skills development to enable people to utilise digital technology more effectively, especially among traditionally hard-to-reach communities.

  1. 29 CFR 825.202 - Intermittent leave or reduced leave schedule.

    Science.gov (United States)

    2010-07-01

    ... leave schedule is a leave schedule that reduces an employee's usual number of working hours per workweek, or hours per workday. A reduced leave schedule is a change in the employee's schedule for a period of... 29 Labor 3 2010-07-01 2010-07-01 false Intermittent leave or reduced leave schedule. 825.202...

  2. Optimal Temporal Decoupling in Task Scheduling with Preferences

    NARCIS (Netherlands)

    Endhoven, L.; Klos, T.B.; Witteveen, C.

    2011-01-01

    Multi-agent planning and scheduling concerns finding a joint plan to achieve some set of common goals with several independent agents each aiming to find a plan or schedule for their part of the goals. To avoid conflicts in these individual plans or schedules decoupling is used. Such a decoupling

  3. Designing of Vague Logic Based 2-Layered Framework for CPU Scheduler

    Directory of Open Access Journals (Sweden)

    Supriya Raheja

    2016-01-01

    Full Text Available Fuzzy based CPU scheduler has become of great interest by operating system because of its ability to handle imprecise information associated with task. This paper introduces an extension to the fuzzy based round robin scheduler to a Vague Logic Based Round Robin (VBRR scheduler. VBRR scheduler works on 2-layered framework. At the first layer, scheduler has a vague inference system which has the ability to handle the impreciseness of task using vague logic. At the second layer, Vague Logic Based Round Robin (VBRR scheduling algorithm works to schedule the tasks. VBRR scheduler has the learning capability based on which scheduler adapts intelligently an optimum length for time quantum. An optimum time quantum reduces the overhead on scheduler by reducing the unnecessary context switches which lead to improve the overall performance of system. The work is simulated using MATLAB and compared with the conventional round robin scheduler and the other two fuzzy based approaches to CPU scheduler. Given simulation analysis and results prove the effectiveness and efficiency of VBRR scheduler.

  4. Request-Driven Schedule Automation for the Deep Space Network

    Science.gov (United States)

    Johnston, Mark D.; Tran, Daniel; Arroyo, Belinda; Call, Jared; Mercado, Marisol

    2010-01-01

    The DSN Scheduling Engine (DSE) has been developed to increase the level of automated scheduling support available to users of NASA s Deep Space Network (DSN). We have adopted a request-driven approach to DSN scheduling, in contrast to the activity-oriented approach used up to now. Scheduling requests allow users to declaratively specify patterns and conditions on their DSN service allocations, including timing, resource requirements, gaps, overlaps, time linkages among services, repetition, priorities, and a wide range of additional factors and preferences. The DSE incorporates a model of the key constraints and preferences of the DSN scheduling domain, along with algorithms to expand scheduling requests into valid resource allocations, to resolve schedule conflicts, and to repair unsatisfied requests. We use time-bounded systematic search with constraint relaxation to return nearby solutions if exact ones cannot be found, where the relaxation options and order are under user control. To explore the usability aspects of our approach we have developed a graphical user interface incorporating some crucial features to make it easier to work with complex scheduling requests. Among these are: progressive revelation of relevant detail, immediate propagation and visual feedback from a user s decisions, and a meeting calendar metaphor for repeated patterns of requests. Even as a prototype, the DSE has been deployed and adopted as the initial step in building the operational DSN schedule, thus representing an important initial validation of our overall approach. The DSE is a core element of the DSN Service Scheduling Software (S(sup 3)), a web-based collaborative scheduling system now under development for deployment to all DSN users.

  5. Differences in uptake of immunisations and health examinations among refugee children compared to Danish-born children: a cohort study.

    Science.gov (United States)

    Moller, Sanne Pagh; Hjern, Anders; Andersen, Anne-Marie Nybo; Norredam, Marie

    2016-04-01

    Refugee children and their families constitute a vulnerable group regarding health and access to care. In a register-based cohort design, we examined differences in uptake of immunisations and child health examinations between refugee children and Danish-born children, including predictors of uptake among refugee children. Refugee children (n = 16,701) who, between January 1993 and December 2010, obtained residency permits in Denmark were included and matched in a 1:6 ratio on age and sex with Danish-born children (n = 100,206). Personal identification numbers were cross-linked to the National Danish Health Service Register, identifying all contacts for immunisation and child health examinations. We estimated hazard ratios (HR) of uptake. Refugee children had a lower uptake of all immunisations compared to Danish-born children. The lowest uptake was found for immunisation against diphtheria, tetanus, pertussis and polio (HR = 0.50; 95 % confidence interval (CI) 0.48-0.51). Participation in child health examinations was also lower among refugee children with the lowest at the last child health examination at age 5 (HR = 0.48; 95 % CI 0.47-0.50). Adjusting the analysis for parental income increased the HRs by 10-20 %. This Danish register-based study using nationwide data revealed a lower uptake of routine immunisations and child health examinations among refugee children compared to Danish-born children. •Uptake of immunisation and child health examination is associated with low household income, unemployment and low educational status among the parents. •Uptake may be even lower among refugee families as they constitute a vulnerable group regarding access to healthcare. What is New: •Refugee children had lower uptake of immunisations and child health examinations compared to Danish-born children. •Several predictors of uptake were identified including region of origin and duration of residence.

  6. PLAN-IT - Scheduling assistant for solar system exploration

    International Nuclear Information System (INIS)

    Dias, W. C.; Henricks, J. A.; Wong, J. C.; California Institute of Technology, Pasadena)

    1987-01-01

    A frame-based expert scheduling system shell, PLAN-IT, is developed for spacecraft scheduling in the Request Integration Phase, using the Comet Rendezvous Asteroid Flyby (CRAF) mission as a development base. Basic, structured, and expert scheduling techniques are reviewed. Data elements such as activity representation and resource conflict representation are discussed. Resource constraints include minimum and maximum separation times between activities, percentage of time pointed at specific targets, and separation time between targeted intervals of a given activity. The different scheduling technique categories and the rationale for their selection are also considered. 13 references

  7. Management Matters. Changing to Flexible Scheduling

    Science.gov (United States)

    Pappas, Marjorie L.

    2005-01-01

    Elementary school library media specialists state that one of the most frustrating issues they face is the fixed schedules in their library media centers. Beyond the cost effectiveness issue, the fixed schedule severely limits using the resources of the library media center for inquiry learning and collaborative teaching experiences between the…

  8. Gain Scheduling for the Orion Launch Abort Vehicle Controller

    Science.gov (United States)

    McNamara, Sara J.; Restrepo, Carolina I.; Madsen, Jennifer M.; Medina, Edgar A.; Proud, Ryan W.; Whitley, Ryan J.

    2011-01-01

    One of NASAs challenges for the Orion vehicle is the control system design for the Launch Abort Vehicle (LAV), which is required to abort safely at any time during the atmospheric ascent portion of ight. The focus of this paper is the gain design and scheduling process for a controller that covers the wide range of vehicle configurations and flight conditions experienced during the full envelope of potential abort trajectories from the pad to exo-atmospheric flight. Several factors are taken into account in the automation process for tuning the gains including the abort effectors, the environmental changes and the autopilot modes. Gain scheduling is accomplished using a linear quadratic regulator (LQR) approach for the decoupled, simplified linear model throughout the operational envelope in time, altitude and Mach number. The derived gains are then implemented into the full linear model for controller requirement validation. Finally, the gains are tested and evaluated in a non-linear simulation using the vehicles ight software to ensure performance requirements are met. An overview of the LAV controller design and a description of the linear plant models are presented. Examples of the most significant challenges with the automation of the gain tuning process are then discussed. In conclusion, the paper will consider the lessons learned through out the process, especially in regards to automation, and examine the usefulness of the gain scheduling tool and process developed as applicable to non-Orion vehicles.

  9. Interactive Anticipatory Scheduling for Two Military Applications

    National Research Council Canada - National Science Library

    Howe, Adele

    2003-01-01

    ...; these models partially explain what makes some job shop scheduling problems difficult. For the second, several algorithms for Air Force Satellite Control Network scheduling have been compared on historical and recent data...

  10. Planning and Scheduling for Environmental Sensor Networks

    Science.gov (United States)

    Frank, J. D.

    2005-12-01

    Environmental Sensor Networks are a new way of monitoring the environment. They comprise autonomous sensor nodes in the environment that record real-time data, which is retrieved, analyzed, integrated with other data sets (e.g. satellite images, GIS, process models) and ultimately lead to scientific discoveries. Sensor networks must operate within time and resource constraints. Sensors have limited onboard memory, energy, computational power, communications windows and communications bandwidth. The value of data will depend on when, where and how it was collected, how detailed the data is, how long it takes to integrate the data, and how important the data was to the original scientific question. Planning and scheduling of sensor networks is necessary for effective, safe operations in the face of these constraints. For example, power bus limitations may preclude sensors from simultaneously collecting data and communicating without damaging the sensor; planners and schedulers can ensure these operations are ordered so that they do not happen simultaneously. Planning and scheduling can also ensure best use of the sensor network to maximize the value of collected science data. For example, if data is best recorded using a particular camera angle but it is costly in time and energy to achieve this, planners and schedulers can search for times when time and energy are available to achieve the optimal camera angle. Planning and scheduling can handle uncertainty in the problem specification; planners can be re-run when new information is made available, or can generate plans that include contingencies. For example, if bad weather may prevent the collection of data, a contingent plan can check lighting conditions and turn off data collection to save resources if lighting is not ideal. Both mobile and immobile sensors can benefit from planning and scheduling. For example, data collection on otherwise passive sensors can be halted to preserve limited power and memory

  11. Adult health study Hiroshima analysis of participation in examinations, July 1958-December 1960

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, Jr, P S

    1961-07-19

    The participation data for Adult Health Study examinations conducted in Hiroshima during the period July 1958 to December 31, 1960, are presented. The continuing medical examination program includes approximately 13,700 individuals who form the Adult Health Study population of ABCC in Hiroshima. The Adult Health Study population is composed of four exposure groups of equal size, matched by age and sex. Participation scores are analyzed with respect to exposure, age, sex, and socioeconomic variables as well as history of previous contact with the ABCC programs. Significant differences were demonstrated between the participation scores by age, marital status, history of prior contact with ABCC, and occupation; this latter category was significant only for males. Although differences were observed for these variables, the significance was usually attributable to one category in each of the variables, often the least populated, such as separated or divorced for marital status; and previous history unknown for prior ABCC contact. A trend was apparent with respect to exposure, with the lowest participation noted in the nonexposed and the highest participation in the exposed group with symptoms. Sex differences were not significant. Although relatively minor differences were demonstrated for some variables, the outstanding features of this program are the remarkable high participation scores. Only 9 percent of the population were in the so-called refusal category and over 80 percent of the living Adult Health Study population, including non-Hiroshima residents, were examined during the period considered by this report. 6 references, 1 figure, 9 tables.

  12. Escalator: An Autonomous Scheduling Scheme for Convergecast in TSCH.

    Science.gov (United States)

    Oh, Sukho; Hwang, DongYeop; Kim, Ki-Hyung; Kim, Kangseok

    2018-04-16

    Time Slotted Channel Hopping (TSCH) is widely used in the industrial wireless sensor networks due to its high reliability and energy efficiency. Various timeslot and channel scheduling schemes have been proposed for achieving high reliability and energy efficiency for TSCH networks. Recently proposed autonomous scheduling schemes provide flexible timeslot scheduling based on the routing topology, but do not take into account the network traffic and packet forwarding delays. In this paper, we propose an autonomous scheduling scheme for convergecast in TSCH networks with RPL as a routing protocol, named Escalator. Escalator generates a consecutive timeslot schedule along the packet forwarding path to minimize the packet transmission delay. The schedule is generated autonomously by utilizing only the local routing topology information without any additional signaling with other nodes. The generated schedule is guaranteed to be conflict-free, in that all nodes in the network could transmit packets to the sink in every slotframe cycle. We implement Escalator and evaluate its performance with existing autonomous scheduling schemes through a testbed and simulation. Experimental results show that the proposed Escalator has lower end-to-end delay and higher packet delivery ratio compared to the existing schemes regardless of the network topology.

  13. Project Scheduling Based on Risk of Gas Transmission Pipe

    Science.gov (United States)

    Silvianita; Nurbaity, A.; Mulyadi, Y.; Suntoyo; Chamelia, D. M.

    2018-03-01

    The planning of a project has a time limit on which must be completed before or right at a predetermined time. Thus, in a project planning, it is necessary to have scheduling management that is useful for completing a project to achieve maximum results by considering the constraints that will exists. Scheduling management is undertaken to deal with uncertainties and negative impacts of time and cost in project completion. This paper explains about scheduling management in gas transmission pipeline project Gresik-Semarang to find out which scheduling plan is most effectively used in accordance with its risk value. Scheduling management in this paper is assissted by Microsoft Project software to find the critical path of existing project scheduling planning data. Critical path is the longest scheduling path with the fastest completion time. The result is found a critical path on project scheduling with completion time is 152 days. Furthermore, the calculation of risk is done by using House of Risk (HOR) method and it is found that the critical path has a share of 40.98 percent of all causes of the occurence of risk events that will be experienced.

  14. 5 CFR 950.801 - Campaign schedule.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Campaign schedule. 950.801 Section 950... VOLUNTARY ORGANIZATIONS CFC Timetable § 950.801 Campaign schedule. (a) The Combined Federal Campaign will be.../International and International parts of the Charity List to all local campaigns by a date to be determined by...

  15. A NEW APPROACH TO CLASS SCHEDULING. FINAL REPORT.

    Science.gov (United States)

    CANTER, JOHN; AND OTHERS

    AN INVESTIGATION OF THE USE OF A PROTOTYPE DEVICE FOR CLASS SCHEDULING WAS MADE. THE BEEKLEY INSITE DEVICE THAT WAS STUDIED USES THE "PEEK-A-BOO" PRINCIPLE OF MATCHING COMPUTER TAPES. A TEST GROUP OF 149 GRADUATE STUDENTS WAS USED. THEIR DESIRED SCHEDULES WERE MATCHED AUTOMATICALLY AGAINST A PROPOSED MASTER SCHEDULE TO EVALUATE THE…

  16. Examining the Relationship between Teacher Organizational Commitment and School Health in Turkish Primary Schools

    Science.gov (United States)

    Sezgin, Ferudun

    2009-01-01

    The purpose of this study was to examine the relationships between teachers' perceptions of organizational commitment and school health in Turkish primary schools. The Organizational Commitment Scale and the Organizational Health Inventory were used to gather data from 323 randomly selected teachers employed in 20 primary schools in Ankara.…

  17. Cost effective shift schedules enhance utility operations

    International Nuclear Information System (INIS)

    Coleman, R.M.

    1995-01-01

    This article describes how new shift scheduling concepts can save utility operations millions of dollars every year and yet maintain safety and improve employee morale. The key to scheduling is to define and match the work load. This includes discretionary as well as daily, weekly, and yearly core work loads. In most power plants the overall work load (including maintenance, operations, materials handling, etc.) on day shift is greater than on other shifts, hence an unbalanced schedule would be appropriate

  18. A randomised, double-blind, placebo-controlled, crossover study to assess the efficacy and safety of three dosing schedules of agalsidase alfa enzyme replacement therapy for Fabry disease.

    Science.gov (United States)

    Hughes, D A; Deegan, P B; Milligan, A; Wright, N; Butler, L H; Jacobs, A; Mehta, A B

    2013-07-01

    Anecdotal reports suggest that the currently approved dosing interval of agalsidase alfa (0.2 mg/kg/2 weeks) for Fabry disease treatment is too long. This randomised, double-blind, placebo-controlled, crossover study investigated three altered dosing intervals. 18 Fabry patients received three agalsidase alfa dosing schedules, each for four weeks (A: 0.2 mg/kg∗2 weeks, B: 0.1 mg/kg/week, C: 0.2 mg/kg/week). Health state, pain levels, sweat volume and latency and plasma and urinary globotriaosylceramide levels were recorded throughout the study. No significant differences were found among the schedules for the primary efficacy outcome of self-assessed health state, or for pain scores. A trend toward increased sweat volume on QSART testing, and reduced urine globotriaosylceramide concentration were seen with treatment schedule C. Agalsidase alfa was safe and well tolerated with all schedules. In conclusion, the primary analyses did not find weekly infusions of agalsidase alfa to be statistically better than the approved dosing schedule however the data indicates that further studies with more patients over a longer period are required to more accurately determine the optimum dose and schedule. Copyright © 2013 Elsevier Inc. All rights reserved.

  19. Modeling the World Health Organization Disability Assessment Schedule II using non-parametric item response models.

    Science.gov (United States)

    Galindo-Garre, Francisca; Hidalgo, María Dolores; Guilera, Georgina; Pino, Oscar; Rojo, J Emilio; Gómez-Benito, Juana

    2015-03-01

    The World Health Organization Disability Assessment Schedule II (WHO-DAS II) is a multidimensional instrument developed for measuring disability. It comprises six domains (getting around, self-care, getting along with others, life activities and participation in society). The main purpose of this paper is the evaluation of the psychometric properties for each domain of the WHO-DAS II with parametric and non-parametric Item Response Theory (IRT) models. A secondary objective is to assess whether the WHO-DAS II items within each domain form a hierarchy of invariantly ordered severity indicators of disability. A sample of 352 patients with a schizophrenia spectrum disorder is used in this study. The 36 items WHO-DAS II was administered during the consultation. Partial Credit and Mokken scale models are used to study the psychometric properties of the questionnaire. The psychometric properties of the WHO-DAS II scale are satisfactory for all the domains. However, we identify a few items that do not discriminate satisfactorily between different levels of disability and cannot be invariantly ordered in the scale. In conclusion the WHO-DAS II can be used to assess overall disability in patients with schizophrenia, but some domains are too general to assess functionality in these patients because they contain items that are not applicable to this pathology. Copyright © 2014 John Wiley & Sons, Ltd.

  20. Constrained choices? Linking employees' and spouses' work time to health behaviors.

    Science.gov (United States)

    Fan, Wen; Lam, Jack; Moen, Phyllis; Kelly, Erin; King, Rosalind; McHale, Susan

    2015-02-01

    There are extensive literatures on work conditions and health and on family contexts and health, but less research asking how a spouse or partners' work conditions may affect health behaviors. Drawing on the constrained choices framework, we theorized health behaviors as a product of one's own time and spouses' work time as well as gender expectations. We examined fast food consumption and exercise behaviors using survey data from 429 employees in an Information Technology (IT) division of a U.S. Fortune 500 firm and from their spouses. We found fast food consumption is affected by men's work hours-both male employees' own work hours and the hours worked by husbands of women respondents-in a nonlinear way. The groups most likely to eat fast food are men working 50 h/week and women whose husbands work 45-50 h/week. Second, exercise is better explained if work time is conceptualized at the couple, rather than individual, level. In particular, neo-traditional arrangements (where husbands work longer than their wives) constrain women's ability to engage in exercise but increase odds of men exercising. Women in couples where both partners are working long hours have the highest odds of exercise. In addition, women working long hours with high schedule control are more apt to exercise and men working long hours whose wives have high schedule flexibility are as well. Our findings suggest different health behaviors may have distinct antecedents but gendered work-family expectations shape time allocations in ways that promote men's and constrain women's health behaviors. They also suggest the need to expand the constrained choices framework to recognize that long hours may encourage exercise if both partners are looking to sustain long work hours and that work resources, specifically schedule control, of one partner may expand the choices of the other. Copyright © 2014 Elsevier Ltd. All rights reserved.