WorldWideScience

Sample records for girders

  1. Wind Turbine Blade with Angled Girders

    DEFF Research Database (Denmark)

    2011-01-01

    The present invention relates to a reinforced blade for a wind turbine, particularly to a blade having a new arrangement of two or more girders in the blade, wherein each of the girders is connected to the upper part and the lower part of the shell and forms an angle with another girder thereby...

  2. Design and test of a girder control system at NSRRC

    International Nuclear Information System (INIS)

    Wang, H.S.; Tsai, Y.L.; Perng, S.Y.; Chen, M.L.; Hsu, K.H.; Lai, W.Y.; Tseng, T.C.; Chen, J.R.

    2012-01-01

    A girder control system is proposed to quickly and precisely adjust the displacement and rotating angle of all girders in the storage ring with little manpower at the Taiwan Photon Source (TPS) project at National Synchrotron Research Center (NSRRC). In this control girder system, six motorized cam movers supporting a girder are driven on three pedestals to perform six-axis adjustments of a girder. A tilt-meter monitors the pitch and roll of each girder; several touch sensors measure the relative displacement between consecutive girders. Moreover, a laser position sensitive detector (PSD) system measuring the relative displacement between straight-section girders is included in this girder control system. Operator can use subroutines developed by MATLAB to control every local girder control system via the web. The test results show that the girder control system adjusts girders quickly, precisely and stably

  3. Performance of self-consolidating concrete in prestressed girders.

    Science.gov (United States)

    2010-04-01

    A structural investigation of self-consolidating concrete (SCC) in AASHTO Type I precast, : prestressed girders was performed. Six test girders were subjected to transfer length and : flexural testing. Three separate concrete mixtures, two girders pe...

  4. Comparative Research of Extra-large-span Cable-stayed Bridge with Steel Truss Girder and Steel Box Girder

    Directory of Open Access Journals (Sweden)

    Tan Manjiang

    2015-01-01

    Full Text Available To research structural performance of extra-large-span cable-stayed bridge under different section forms, with the engineering background of a 800m main-span cable-stayed bridge with steel truss girder, the cable-stayed bridge with steel box girder is designed according to the current bridge regulations when two bridges are designed in an ultimate state of the carrying capacity, so the maximum stress and minimum stress of the stress envelope diagram are substantially the same. A comprehensive comparison is given to two types of bridge on the aspect of static force, natural vibration frequency, stability, economic performance and so on. Analysis results provide future reference for the large-span cable-stayed bridge to select between the steel truss girder and the steel box girder.

  5. Comparison Between PCI and Box Girder in BridgesPrestressed Concrete Design

    Science.gov (United States)

    Rahmawati, Cut; Zainuddin, Z.; Is, Syafridal; Rahim, Robbi

    2018-04-01

    This research is done by comparing PCI and Box Girder types of prestressed concrete design. The method used is load balance. Previous studies have just discussed the differences in terms of effectiveness and economics. In this study, the researchers want to know the design process by comparing the working forces, the resulting moment, and the losses of the prestressed. As the case in this study, the researchers used the bridge with the span of 31 meters. The tendon pulling system was conducted with post-tensioning system The analysis result showed that prestressed of the Girder box type sustained the greatest moment due to the combination of its own weight, additional dead load, lane load, and wind load of 44,029 kNm, while the biggest moment of PCI Girder was 7,556.75 KNm The Girder beam box experiences greater moment and shear force than PCI Girder. This is the effect of the weight of its own Girderboxwaslarger than PCI Girder. The losses ofprestressed style of Girderboxand PCI Girder type were 24.85% and 26.32%, respectively.Moreover, it showed that the type of Girder box is cheaper, easier, and more efficient than PCI Girder.

  6. Analytical Calculation And FEM Analysis Main Girder Double Girder Bridge Crane

    Directory of Open Access Journals (Sweden)

    Muamer Delić

    2017-02-01

    Full Text Available The cranes are now not replaceable mode of transport of materials and finished products both in production halls and in the open space. This paper made the whole analytical calculation of double girder bridge cranes to be used in laboratories exclusively for testing, determined by the maximum bending stress and deflection of the main girder. After calculating the dimensions, we created a model cranes in software CATIA V5. The same model was subjected to FEM analysis of the same name software. At the end of the paper comparison has been done. The objective of the calculation and analysis of the model was to develop a model crane and to serve for the next tests. Dimensions of the crane are given according to the laboratory where it will be located.

  7. Behaviour of parallel girders stabilised with U-frames

    DEFF Research Database (Denmark)

    Virdi, Kuldeep; Azzi, Walid

    2010-01-01

    Lateral torsional buckling is a key factor in the design of steel girders. Stability can be enhanced by cross-bracing, reducing the effective length and thus increasing the ultimate capacity. U-frames are an option often used to brace the girders when designing through type of bridges and where...... overhead bracing is not practical. This paper investigates the effect of the U-frame spacing on the stability of the parallel girders. Eigenvalue buckling analysis was undertaken with four different spacings of the U-frames. Results were extracted from finite element analysis, interpreted and conclusions...

  8. Design and test of box girder for a large wind turbine blade

    Energy Technology Data Exchange (ETDEWEB)

    Nielsen, Per H.; Tesauro, A.; Bitsche, R. [Technical Univ. of Denmark. DTU Wind Energy, DTU Risoe Campus, Roskilde (Denmark)] [and others

    2012-09-15

    This report is covering the structural design and full scale test of a box girder as a part of the project ''Demonstration of new blade design using manufacturing process simulations'' supported by the EUDP program. A box girder with a predetermined outer geometry was designed using new inventions, which create an inner structure in the box girder. With a combination of advanced FEM analysis and the inventions it was possible to reduce the material thickness of the cap by up to 40%. The new design of the box girder was manufactured at SSP Technology A/S, where it was demonstrated that the manufacturing process could include the new inventions. Subsequently the box girder was transported to the blade test facility at DTU Wind Energy. A series of test was performed with the blade to investigate the behaviour during loading, and finally the girder was loaded to ultimate failure. The report includes the description of the test setup, the test and an overview over the results from the test performed on the box girder. During the final test the box girder failed at 58 % of the expected ultimate load. Unfortunately, no definite conclusion could be made concerning the failure mechanism. (Author)

  9. Design of bridge crane girder strain acquisition system based on virtual instrument

    Directory of Open Access Journals (Sweden)

    Wenxue LIU

    Full Text Available Girder is an important part of the bridge crane, which is also the main force element. In order to prevent accidents, it is necessary to collect the bridge crane girder stress data to analyse the fatigue life. This paper constructs a bridge crane girder strain acquisition system. The hardware system consists of sensors, connectors, data acquisition cards, wireless data transmission groups, POE power and host computer. The software system consists of NI MAX to interface with the computer's NI hardware and software resources,and LabVIEW programming to display and storage the girder strain data. Through this system, positions and working days strain data acquisition for the 50/10 t bridge crane girder gets the key positions strain data. The results show that the girder strain data acquisition system runs stably, channel signals of acquisition task transmit accurately, and the terminal data stores competely, meeting the detection requirements, which provides an important data support for the subsequent fatigue analysis and accurate remaining service life prediction of the crane girder.

  10. Condition Assessment of PCI Bridge Girder a Result of The Reduction Prestressing Force

    Directory of Open Access Journals (Sweden)

    Suangga Made

    2014-03-01

    Full Text Available PCI bridge girders is known and widely used for many construction e.g.: bridge, wharf, flyover, and other application. PC Bridge girders have two types: Pre - tensioned girders and post - tensioned girders. In pre tensioned girders, prestressing in carried out first then after that the fresh concrete poured. The prestressing process in only carried off after the concrete has sufficient strength. In this study, analysis was conducted for PCI bridge girder with span is 40 meters. Based on the data geometry bridge dimension girder, material girder, and material strands cable, it will be analyzed to calculate the natural frequencies and moment capacity using finite element program (Midas/Civil program. So it can be estimated how much the percentage reduction prestress force on the bridge until PCI bridge structure collapses. From the calculation, it found that the pattern comparison between reduction prestressing force and natural frequency are linear. These results are also similar for natural frequency versus moment capacity.PCI bridge will collapse when the reduction prestreesing force of 45 % to 50 % from the total loss of prestressing.

  11. STRESS-DEFORMED STATE OF A STRUT-FRAMED CRANE GIRDER

    Directory of Open Access Journals (Sweden)

    Kh. M. Muselemov

    2017-01-01

    Full Text Available Objectives. The aim of the present work is to study the influence of design parameters on the stress-deformed state of a sprengel crane girder; to compile the tables and corresponding graphs illustrating changes in internal force factors in the characteristic cross-sections of the system elements under consideration. The article describes the study of the stress-deformed state (SDS of a metal strut-framed crane girder.Methods. Numerical methods of analysis based on the use of the Green's function are used during solving this problem. A dimensionless parameter is introduced, depending on which the tables and graphs are constructed. According to the known algorithm, the calculations of internal force factors in the sections of the considered construction are performed.Results. Depending on the dimensionless parameter characterising the geometry and physical features of the system, tables of bending moments and transverse forces are compiled. According to these tables, the appropriate graphs are plotted in order to choose easily the optimal design parameters.Conclusion. The dependence of the moments and transverse forces on the dimensionless parameter k was found, the corresponding graphs were plotted and the metal costs for the girders were calculated. The minimum values of the moments and transverse forces are established to take place when the dimensionless parameter k values are close to zero. The most economical was a strut-framed crane girder having k = 0.0001. The most uneconomical had k = 0.05 and k =∞. Eventually, the sprengel girders were found to be more profitable as compared to conventional crane girders. In the examples considered in the article, the metal savings amounted up to 14%. The presented methodology allows the calculation and designing of strut-framed crane girders with two racks to be carried out. 

  12. Development of guidelines for transportation of prestressed concrete girders.

    Science.gov (United States)

    2011-11-01

    "Prestressed concrete girders are an economical superstructure system for bridges. With the : advent of higher strength concretes and more effi cient cross sections, the use of long span (>100 : ft.) prestressed girders are now specifi ed. Such long ...

  13. Shear capacity of in service prestressed concrete bridge girders.

    Science.gov (United States)

    2010-05-17

    The design of prestressed concrete bridge girders has changed significantly over the past several : decades. Specifically, the design procedure to calculate the shear capacity of bridge girders that : was used forty years ago is very different than t...

  14. Design and test of box girder for a large wind turbine blade

    DEFF Research Database (Denmark)

    Nielsen, Per Hørlyk; Tesauro, Angelo; Bitsche, Robert

    This report is covering the structural design and full scale test of a box girder as a part of the project “Demonstration of new blade design using manufacturing process simulations” supported by the EUDP program. A box girder with a predetermined outer geometry was designed using new inventions...... that the manufacturing process could include the new inventions. Subsequently the box girder was transported to the blade test facility at DTU Wind Energy. A series of test was performed with the blade to investigate the behaviour during loading, and finally the girder was loaded to ultimate failure. The report includes...... the description of the test setup, the test and an overview over the results from the test performed on the box girder. During the final test the box girder failed at 58 % of the expected ultimate load. Unfortunately, no definite conclusion could be made concerning the failure mechanism....

  15. Wave induced extreme hull girder loads on containerships

    DEFF Research Database (Denmark)

    Jensen, Jørgen Juncher; Pedersen, Preben Terndrup; Shi, Bill

    2009-01-01

    This paper provides simple but rational procedures for prediction of extreme wave – induced sectional hull girder forces with reasonable engineering accuracy. The procedures take into account main ship hull characteristics such as: length, breadth, draught, block coefficient, bow flare coefficient......, forward speed and hull flexibility. The vertical hull girder loads are evaluated for specific operational profiles. Firstly a quadratic strip theory is presented which can give separate predictions for the hogging and sagging bending moments and shear forces and for hull girder loads. Then this procedure...... is based on rational methods it can be applied for novel single hull ship types not presently covered by the rules of the classification societies or to account for specific operational profiles....

  16. Effect of longitudinal stiffening on bridge girder webs at incremental launching stage

    Directory of Open Access Journals (Sweden)

    Carlos Graciano

    2015-01-01

    Full Text Available Patch loading is a predominant load case at incremental bridge launching. Bridge girder webs are frequently provided with longitudinal stiffeners to increase in-service shear and bending strength, and its effect has been included in design codes. However, no straightforward rules are given to account for the influence of such stiffeners on improving the patch loading resistance. This paper presents a review of some available formulae found in the literature to estimate the girder ultimate strength including the provisions of the European, American and Colombian design codes. Additionally, a nonlinear finite element analysis is conducted on three case studies related to actual launched bridges. The case studies are also used to study the influence of the longitudinal stiffener and girder depth on the girder capacity. Different load-displacement responses are observed depending on the girder depth. Finally, the finite element analysis shows to what extent the longitudinal stiffeners can increase the patch loading capacity of bridge girder webs during launching.

  17. Development of bridge girder movement criteria for accelerated bridge construction.

    Science.gov (United States)

    2014-06-01

    End diaphragms connect multiple girders to form a bridge superstructure system for effective resistance to earthquake loads. Concrete : girder bridges that include end diaphragms consistently proved to perform well during previous earthquake events. ...

  18. Repair of cracked prestressed concrete girders, I-565, Huntsville, Alabama.

    Science.gov (United States)

    2011-07-01

    Wide cracks were discovered in prestressed concrete bridge girders shortly after their construction in Huntsville, Alabama. Previous investigations of these continuous-for-live-load girders revealed that the cracking resulted from restrained thermal ...

  19. PARAMETRIC STUDY OF SKEW ANGLE ON BOX GIRDER BRIDGE DECK

    OpenAIRE

    Shrikant D. Bobade *, Dr. Valsson Varghese

    2016-01-01

    Box girder bridge deck, is the most common type of bridges in world and India, it consists of several Slab or girders. The span in the direction of the roadway and connected across their tops and bottoms by a thin continuous structural stab, the longitudinal box girders can be made of steel or concrete. The Simple supported single span concrete bridge deck is presented in present study. Skewed bridges are suitable in highway design when the geometry of straight bridges is not possible. The sk...

  20. Suspension Bridge Flutter for Girder with Separate Control Flaps

    DEFF Research Database (Denmark)

    Huynh, T.; Thoft-Christensen, Palle

    Active vibration control of long span suspension bridge flutter using separated control flaps (SFSC) has shown to increase effectively the critical wind speed of bridges. In this paper, an SFSC calculation based on modal equations of the vertical and torsional motions of the bridge girder including...... the flaps is presented. The length of the flaps attached to the girder, the flap configuration and the flap rotational angles are parameters used to increase the critical wind speed of the bridge. To illustrate the theory a numerical example is shown for a suspension bridge of 1000m+2500m+1000m span based...... on the Great Belt Bridge streamlined girder....

  1. The effect of span length and girder type on bridge costs

    Directory of Open Access Journals (Sweden)

    Batikha Mustafa

    2017-01-01

    Full Text Available Bridges have an important role in impacting the civilization, growth and economy of cities from ancient time until these days due to their function in reducing transportation cost and time. Therefore, development of bridges has been a knowledge domain in civil engineering studies in terms of their types and construction materials to confirm a reliable, safe, economic design and construction. Girder-bridge of concrete deck and I-beam girder has been used widely for short and medium span bridges because of ease and low-cost of fabrication. However, many theoretical and practical investigations are still undertaken regarding the type of beam girder; i.e steel composite or prestressed concrete. This paper evaluates the effect of bridge span and the type of girder on the capital cost and life cycle costs of bridges. Three types of girders were investigated in this research: steel composite, pre-tensioned pre-stressed concrete and post-tensioned pre-stressed concrete. The structural design was analyzed for 5 span lengths: 20, 25, 30, 35 and 40m. Then, the capital construction cost was accounted for 15 bridges according to each span and construction materials. Moreover, the maintenance required for 50 years of bridge life was evaluated and built up as whole life costs for each bridge. As a result of this study, the influence of both span length and type of girder on initial construction cost and maintenance whole life costs were assessed to support the decision makers and designers in the selection process for the optimum solution of girder bridges.

  2. Experimental Investigation for Behavior of Spliced Continuous RC Girders Strengthened with CFRP Laminates

    Directory of Open Access Journals (Sweden)

    Ammar Yasir Ali

    2016-03-01

    Full Text Available In this paper, the behavior of spliced continuous reinforced concrete girders was experimentally investigated. The main objective was to examine the contribution of the carbon fiber reinforced polymer (CFRP laminates in strengthening the spliced continuous reinforced concrete girders. Eight models of continuous reinforced concrete girder were constructed and tested. The test variables were strengthening the splice joints by different schemes of CFRP laminates, presence of horizontal stirrups through the interfaces of the joints and using binder material at the interfaces of the joints. The results showed that strengthening the continuous spliced girders with 45° inclined CFRP laminates led to an increase in the ultimate load in a range of (47 to 74%. Besides, strengthening the continuous spliced girder with horizontal CFRP laminates bonded at its lateral faces could increase the ultimate load by 70%. Additionally, the ultimate load of the continuous spliced girder was increased by (30% due to presence of the horizontal steel stirrups through the interfaces of the joints

  3. Distortional Buckling Analysis of Steel-Concrete Composite Girders in Negative Moment Area

    Directory of Open Access Journals (Sweden)

    Zhou Wangbao

    2014-01-01

    Full Text Available Distortional buckling is one of the most important buckling modes of the steel-concrete composite girder under negative moment. In this study, the equivalent lateral and torsional restraints of the bottom flange of a steel-concrete composite girder under negative moments due to variable axial forces are thoroughly investigated. The results show that there is a coupling effect between the applied forces and the lateral and torsional restraint of the bottom flange. Based on the calculation formula of lateral and torsional restraints, the critical buckling stress of I-steel-concrete composite girders and steel-concrete composite box girders under variable axial force is obtained. The critical bending moment of the steel-concrete composite girders can be further calculated. Compared to the traditional calculation methods of elastic foundation beam, the paper introduces an improved method, which considers coupling effect of the external loads and the foundation spring constraints of the bottom flange. Fifteen examples of the steel-concrete composite girders in different conditions are calculated. The calculation results show a good match between the hand calculation and the ANSYS finite element method, which validated that the analytic calculation method proposed in this paper is practical.

  4. Continuity diaphragm for skewed continuous span precast prestressed concrete girder bridges : technical summary report.

    Science.gov (United States)

    2004-03-01

    Most highway bridges are built as cast-in-place : reinforced concrete slabs and prestressed concrete : girders. The shear connectors on the top of the girders : assure composite action between the slabs and : girders. The design guidelines for bridge...

  5. Implementation and field evaluation of pretensioned concrete girder end crack control.

    Science.gov (United States)

    2016-05-01

    Wisconsin bulb tee pretensioned concrete girders are currently used for bridge construction. Their efficiency in load resistance has made them particularly desirable. To provide that efficiency, these girders are heavily prestressed. Cracking is evid...

  6. Numerical/experimental research on welded joints in aluminium truss girders

    NARCIS (Netherlands)

    van Hove, B.W.E.M.; Soetens, F.; Mazzolani, F.M.; Bellucci, F.; Faggiano, B.; Squillace, A.

    2016-01-01

    Welded joints in a 30 meter span aluminium truss girder were investigated numerically and experimentally. Since aluminium design rules for welded K-and N-joints in CHS truss girders were lacking the joints were checked using steel design rules. Calculations showed that the N-joints were governing

  7. Prestressing force monitoring method for a box girder through distributed long-gauge FBG sensors

    Science.gov (United States)

    Chen, Shi-Zhi; Wu, Gang; Xing, Tuo; Feng, De-Cheng

    2018-01-01

    Monitoring prestressing forces is essential for prestressed concrete box girder bridges. However, the current monitoring methods used for prestressing force were not applicable for a box girder neither because of the sensor’s setup being constrained or shear lag effect not being properly considered. Through combining with the previous analysis model of shear lag effect in the box girder, this paper proposed an indirect monitoring method for on-site determination of prestressing force in a concrete box girder utilizing the distributed long-gauge fiber Bragg grating sensor. The performance of this method was initially verified using numerical simulation for three different distribution forms of prestressing tendons. Then, an experiment involving two concrete box girders was conducted to study the feasibility of this method under different prestressing levels preliminarily. The results of both numerical simulation and lab experiment validated this method’s practicability in a box girder.

  8. Study on the Old Girders in the Widening Hollow Slab Girder Bridge

    Science.gov (United States)

    Wang, Ying; Zhang, Li Fang; Ma, Hai Yan

    2018-06-01

    Taking the bridge widening project of Shanghai-Hangzhou-Ningbo expressway widening construction project (China) as the background in this paper, the variation law of the internal force of the old bridge in the widening hollow slab girder bridge under vehicle load is studied, which is under the condition of different span lengths and different widening widths. Three different span lengths of the pre-tensioned prestressed hollow slab girder bridges are selected, the spatial finite element models of both the old bridge and the whole structure of widening bridge are established and calculated respectively by Midas/Civil software. The influences of widening and load increasing on the old bridges under the vehicle load are compared and analyzed. In addition, the authors also analyze the influences of different widening widths on the force state of old bridges under the condition of widening the same number of lane. Moreover , the effects on the old bridges that are caused by the uneven foundation settlement of widening bridge structure are also studied in this paper. This paper can provide some references for widening design of hollow slab bridges.

  9. Behavior of Reinforced Concrete Hybrid Trapezoidal Box Girders Using Ordinary and Highly Strength Concrete

    Directory of Open Access Journals (Sweden)

    Nameer A. Alawsh

    2018-03-01

    Full Text Available In this paper, the general behavior of reinforced concrete hybrid box girders is studied by experimental and numerical investigation. Experimental work is included casting monolithically five specimens of box girders with trapezoidal cross section and testing it as simply supported under two point loading. Two specimens were cast as homogenous box girders (full normal strength concrete (NSC (about 35 MPa and full high strength concrete (HSC (about 55 MPa and three specimens were cast as hybrid box girders (HSC in upper flange only, HSC in upper flange and half depth of webs, and HSC in bottom flange and total depth of webs. Experimental results showed significant effects of concrete hybridization on the structural behavior of box girders specimens such as: cracking loads, cracking patterns, ultimate strengths, and failure modes. The ultimate strength of Hybrid box girders increased by 23% as average when compared with the homogenous box girder (full NSC and decreased by 9% as average when compared with homogenous box girder (full HSC. In numerical investigation, the tested specimens were modeled and analyzed using three dimensional non-linear finite element analysis. The analysis was carried out by using a computer program (ANSYS V16.1. The numerical results showed an acceptable agreement with the experimental work with difference about (3.12% and 9.588% as average for ultimate load and deflection, respectively.

  10. Investigation of Ultimate Strength of Composite Open-Web Joist-Girders

    OpenAIRE

    Showalter, Sheldon Lee

    1999-01-01

    The goal of this research was to study several methods of generating composite action using open-web joist-girders, designed and manufactured by Nucor Corporation. In addition to comparing the relative performance of these systems, it was intended to determine whether the current accepted design procedure for composite joists could be extended to joist-girders.

  11. Development of Embedded EM Sensors for Estimating Tensile Forces of PSC Girder Bridges

    Science.gov (United States)

    Kim, Ju-Won; Lee, Chaggil; Park, Seunghee

    2017-01-01

    The tensile force of pre-stressed concrete (PSC) girders is the most important factor for managing the stability of PSC bridges. The tensile force is induced using pre-stressing (PS) tendons of a PSC girder. Because the PS tendons are located inside of the PSC girder, the tensile force cannot be measured after construction using conventional NDT (non-destructive testing) methods. To monitor the induced tensile force of a PSC girder, an embedded EM (elasto-magnetic) sensor was proposed in this study. The PS tendons are made of carbon steel, a ferromagnetic material. The magnetic properties of the ferromagnetic specimen are changed according to the induced magnetic field, temperature, and induced stress. Thus, the tensile force of PS tendons can be estimated by measuring their magnetic properties. The EM sensor can measure the magnetic properties of ferromagnetic materials in the form of a B (magnetic density)-H (magnetic force) loop. To measure the B-H loop of a PS tendon in a PSC girder, the EM sensor should be embedded into the PSC girder. The proposed embedded EM sensor can be embedded into a PSC girder as a sheath joint by designing screw threads to connect with the sheath. To confirm the proposed embedded EM sensors, the experimental study was performed using a down-scaled PSC girder model. Two specimens were constructed with embedded EM sensors, and three sensors were installed in each specimen. The embedded EM sensor could measure the B-H loop of PS tendons even if it was located inside concrete, and the area of the B-H loop was proportionally decreased according to the increase in tensile force. According to the results, the proposed method can be used to estimate the tensile force of unrevealed PS tendons. PMID:28867790

  12. A Finite Segment Method for Skewed Box Girder Analysis

    Directory of Open Access Journals (Sweden)

    Xingwei Xue

    2018-01-01

    Full Text Available A finite segment method is presented to analyze the mechanical behavior of skewed box girders. By modeling the top and bottom plates of the segments with skew plate beam element under an inclined coordinate system and the webs with normal plate beam element, a spatial elastic displacement model for skewed box girder is constructed, which can satisfy the compatibility condition at the corners of the cross section for box girders. The formulation of the finite segment is developed based on the variational principle. The major advantage of the proposed approach, in comparison with the finite element method, is that it can simplify a three-dimensional structure into a one-dimensional structure for structural analysis, which results in significant saving in computational times. At last, the accuracy and efficiency of the proposed finite segment method are verified by a model test.

  13. Developing Extended Strands in Girder-Cap Beam Connections for Positive Moment Resistance

    Science.gov (United States)

    2017-11-01

    In bridges constructed with precast prestressed concrete girders, resistance to seismic effects is achieved by the interaction between the columns, the cap beam and the girders. These components must be connected to provide flexural resistance. Under...

  14. Bridge maintenance to enhance corrosion resistance and performance of steel girder bridges

    Science.gov (United States)

    Moran Yanez, Luis M.

    The integrity and efficiency of any national highway system relies on the condition of the various components. Bridges are fundamental elements of a highway system, representing an important investment and a strategic link that facilitates the transport of persons and goods. The cost to rehabilitate or replace a highway bridge represents an important expenditure to the owner, who needs to evaluate the correct time to assume that cost. Among the several factors that affect the condition of steel highway bridges, corrosion is identified as the main problem. In the USA corrosion is the primary cause of structurally deficient steel bridges. The benefit of regular high-pressure superstructure washing and spot painting were evaluated as effective maintenance activities to reduce the corrosion process. The effectiveness of steel girder washing was assessed by developing models of corrosion deterioration of composite steel girders and analyzing steel coupons at the laboratory under atmospheric corrosion for two alternatives: when high-pressure washing was performed and when washing was not considered. The effectiveness of spot painting was assessed by analyzing the corrosion on steel coupons, with small damages, unprotected and protected by spot painting. A parametric analysis of corroded steel girder bridges was considered. The emphasis was focused on the parametric analyses of corroded steel girder bridges under two alternatives: (a) when steel bridge girder washing is performed according to a particular frequency, and (b) when no bridge washing is performed to the girders. The reduction of structural capacity was observed for both alternatives along the structure service life, estimated at 100 years. An economic analysis, using the Life-Cycle Cost Analysis method, demonstrated that it is more cost-effective to perform steel girder washing as a scheduled maintenance activity in contrast to the no washing alternative.

  15. Implementation of straight and curved steel girder erection design tools construction : summary.

    Science.gov (United States)

    2010-11-05

    Project 0-5574 Curved Plate Girder Design for Safe and Economical Construction, resulted in the : development of two design tools, UT Lift and UT Bridge. UT Lift is a spreadsheet-based program for analyzing : steel girders during lifting while ...

  16. Strength Enhancement of Prestressed Concrete Dapped-End Girders

    Directory of Open Access Journals (Sweden)

    Shatha Dhia Mohammed

    2015-10-01

    Full Text Available This paper presents the application of nonlinear finite element models in the analysis of dapped-ends pre-stressed reinforced concrete girders under static loading by using ANSYS software. The girder dimensions are (4.90 m span, 0.40 m depth, 0.20 m width, 0.20 m nib depth, and 0.10 m nib length and the parameters considered in this research are the pre-stress effect, and strand profile (straight and draped. The numerical results are compared with the experimental results of the same girders. The comparisons are carried out in terms of initial prestress effect, load- deflection curve, and failure load. Good agreement was obtained between the analytical and experimental results. Even that, the numerical model was stiffer than the experimental, but; there were a good agreements in both trends and values. The difference varies in the range (5-12% for the deflection. Results have shown that the pre-stress force has increased the static ultimate load capacity by (35% in case of straight strand and by (97% in case of draped strand

  17. Complex Method Mixed with PSO Applying to Optimization Design of Bridge Crane Girder

    Directory of Open Access Journals (Sweden)

    He Yan

    2017-01-01

    Full Text Available In engineer design, basic complex method has not enough global search ability for the nonlinear optimization problem, so it mixed with particle swarm optimization (PSO has been presented in the paper,that is the optimal particle evaluated from fitness function of particle swarm displacement complex vertex in order to realize optimal principle of the largest complex central distance.This method is applied to optimization design problems of box girder of bridge crane with constraint conditions.At first a mathematical model of the girder optimization has been set up,in which box girder cross section area of bridge crane is taken as the objective function, and its four sizes parameters as design variables, girder mechanics performance, manufacturing process, border sizes and so on requirements as constraint conditions. Then complex method mixed with PSO is used to solve optimization design problem of cane box girder from constrained optimization studying approach, and its optimal results have achieved the goal of lightweight design and reducing the crane manufacturing cost . The method is reliable, practical and efficient by the practical engineer calculation and comparative analysis with basic complex method.

  18. Repair of Impact-Damaged Prestressed Bridge Girders Using Strand Splices and Fabric Reinforced Cementitious Matrix

    OpenAIRE

    Jones, Mark Stevens

    2017-01-01

    This thesis investigates the repair of impact-damaged prestressed concrete bridge girders with strand splices and fabric-reinforced cementitious matrix systems, specifically for repair of structural damage to the underside of an overpass bridge girder due to an overheight vehicle collision. Collision damage to bridges can range from minor to catastrophic, potentially requiring repair or replacement of a bridge girder. This thesis investigates the performance of two different types of repair...

  19. review of elastic analys ew of elastic analysis of box girder bridges

    African Journals Online (AJOL)

    eobe

    Nigerian Journal of Technology,. Vol. 34, No. 1, January 2015 87 bridges under the attack of pitting corrosion. Savkovic et al. [130] proposed an optimum solution to optimization of the box section of the main girder of the bridge crane. Reduction of the girder mass was set as the objective function. Optimum dimensions of the.

  20. Evaluation on Impact Interaction between Abutment and Steel Girder Subjected to Nonuniform Seismic Excitation

    Directory of Open Access Journals (Sweden)

    Yue Zheng

    2015-01-01

    Full Text Available This paper aims to evaluate the impact interaction between the abutment and the girder subjected to nonuniform seismic excitation. An impact model based on tests is presented by taking material properties of the backfill of the abutment into consideration. The conditional simulation is performed to investigate the spatial variation of earthquake ground motions. A two-span continuous steel box girder bridge is taken as the example to analyze and assess the pounding interaction between the abutment and the girder. The detailed nonlinear finite element (FE model is established and the steel girder and the reinforced concrete piers are modeled by nonlinear fiber elements. The pounding element of the abutment is simulated by using a trilinear compression gap element. The elastic-perfectly plastic element is used to model the nonlinear rubber bearings. The comparisons of the pounding forces, the shear forces of the nonlinear bearings, the moments of reinforced concrete piers, and the axial pounding stresses of the steel girder are studied. The made observations indicate that the nonuniform excitation for multisupport bridge is imperative in the analysis and evaluation of the pounding effects of the bridges.

  1. Self-Consolidating Concrete for Prestressed Bridge Girders

    Science.gov (United States)

    2017-07-01

    This document reports the findings of a research project designed to better understand material and structural performance of prestressed bridge girders made with Self-Consolidating Concrete (SCC) from Wisconsin. SCC has high potential to be used for...

  2. Study and application of micrometric alignment on the prototype girders of the CLIC Two-Beam Module

    CERN Document Server

    Gazis, Nikolaos; Mainaud-Durand, Hélène; Samochkine, Alexandre; Anastasopoulos, Michail

    2011-01-01

    The Compact LInear Collider (CLIC), currently under study at CERN, aims at the development of a Multi-TeV e+ e- collider. The micro-precision CLIC RF-structures will have an accelerating gradient of 100 MV/m and will be mounted and aligned on specially developed supporting girders. The girder fabrication constraints are dictated by stringent physics requirements. The micrometric pre-alignment over several kilometers of girders, allow for the CLIC structures to fulfill their acceleration and collision functionality. Study of such girders and their sophisticated alignment method, is a challenging case involving dedicated mechanical design as well as prototype production and experimental testing.

  3. Design aids of NU I-girders bridges.

    Science.gov (United States)

    2010-05-01

    Precast prestressed concrete I-Girder bridges have become the most dominant bridge system in the United States. In the early design : stages, preliminary design becomes a vital first step in designing an economical bridge. Within the state of Nebrask...

  4. Design proposal for ultimate shear strength of tapered steel plate girders

    Directory of Open Access Journals (Sweden)

    A. Bedynek

    2017-03-01

    Full Text Available Numerous experimental and numerical studies on prismatic plate girders subjected to shear can be found in the literature. However, the real structures are frequently designed as non-uniform structural elements. The main objective of the research is the development of a new proposal for the calculation of the ultimate shear resistance of tapered steel plate girders taking into account the specific behaviour of such members. A new mechanical model is presented in the paper and it is used to show the differences between the behaviour of uniform and tapered web panels subjected to shear. EN 1993-1-5 design specifications for the determination of the shear strength for rectangular plates are improved in order to assess the shear strength of tapered elements. Numerical studies carried out on tapered steel plate girders subjected to shear lead to confirm the suitability of the mechanical model and the proposed design expression.

  5. Effects of Adhesive Connection on Composite Action between FRP Bridge Deck and Steel Girder

    Directory of Open Access Journals (Sweden)

    Xu Jiang

    2017-01-01

    Full Text Available The FRP-steel girder composite bridge system is increasingly used in new constructions of bridges as well as rehabilitation of old bridges. However, the understanding of composite action between FRP decks and steel girders is limited and needs to be systematically investigated. In this paper, depending on the experimental investigations of FRP to steel girder system, the Finite Element (FE models on experiments were developed and analyzed. Comparison between experiments and FE results indicated that the FE models were much stiffer for in-plane shear stiffness of the FRP deck panel. To modify the FE models, rotational spring elements were added between webs and flanges of FRP decks, to simulate the semirigid connections. Numerical analyses were also conducted on four-point bending experiments of FRP-steel composite girders. Good agreement between experimental results and FE analysis was achieved by comparing the load-deflection curves at midspan and contribution of composite action from FRP decks. With the validated FE models, the parametric studies were conducted on adhesively bonded connection between FRP decks and steel girders, which indicated that the loading transfer capacity of adhesive connection was not simply dependent on the shear modulus or thickness of adhesive layer but dominated by the in-plane shear stiffness K.

  6. Simplified method for the transverse bending analysis of twin celled concrete box girder bridges

    Science.gov (United States)

    Chithra, J.; Nagarajan, Praveen; S, Sajith A.

    2018-03-01

    Box girder bridges are one of the best options for bridges with span more than 25 m. For the study of these bridges, three-dimensional finite element analysis is the best suited method. However, performing three-dimensional analysis for routine design is difficult as well as time consuming. Also, software used for the three-dimensional analysis are very expensive. Hence designers resort to simplified analysis for predicting longitudinal and transverse bending moments. Among the many analytical methods used to find the transverse bending moments, SFA is the simplest and widely used in design offices. Results from simplified frame analysis can be used for the preliminary analysis of the concrete box girder bridges.From the review of literatures, it is found that majority of the work done using SFA is restricted to the analysis of single cell box girder bridges. Not much work has been done on the analysis multi-cell concrete box girder bridges. In this present study, a double cell concrete box girder bridge is chosen. The bridge is modelled using three- dimensional finite element software and the results are then compared with the simplified frame analysis. The study mainly focuses on establishing correction factors for transverse bending moment values obtained from SFA.

  7. Numerical Analysis on Variation of Dynamic Response of Girder Bridges with Torsional Reinforcement Panels

    Directory of Open Access Journals (Sweden)

    Kang Jae-Yoon

    2015-01-01

    Full Text Available The dynamic flexural behaviour of the railway bridge is influenced by its torsional behaviour. Especially, in the case of girder railway bridges, the dynamic response tends to amplify when the natural frequency in flexure (1st vibration mode is close to that in torsion (2nd vibration mode. In order to prevent such situation, it is necessary to adopt a flexural-to-torsional natural frequency ratio larger than 120%. This study proposes a solution shifting the natural frequency in torsion to high frequency range and restraining torsion by installing concrete panels on the bottom flange of the girder so as to prevent the superposition of the responses in the girder bridge. The applicability of this solution is examined by finite element analysis of the shift of the torsional natural frequency and change in the dynamic response according to the installation of the concrete panels. The analytical results for a 30 m-span girder railway bridge indicate that installing the concrete panels increases the natural frequency in torsion by restraining the torsional behaviour and reduces also the overall dynamic response. It is seen that the installation of 100 mm-thick concrete panels along a section of 4 m at both extremities of the girder can reduce the dynamic response by more than 30%.

  8. Deflection monitoring for a box girder based on a modified conjugate beam method

    Science.gov (United States)

    Chen, Shi-Zhi; Wu, Gang; Xing, Tuo

    2017-08-01

    After several years of operation, a box girder bridge would commonly experience excessive deflection, which endangers the bridge’s life span as well as the safety of vehicles travelling on it. In order to avoid potential risks, it is essential to constantly monitor the defection of box girders. However, currently, the direct deflection monitoring methods are limited by the complicated environments beneath the bridges, such as rivers or other traffic lanes, which severely impede the layouts of the sensors. The other indirect deflection monitoring methods mostly do not thoroughly consider the inherent shear lag effect and shear deformation in the box girder, resulting in a rather large error. Under these circumstances, a deflection monitoring method suiting box girders is proposed in this article, based on the conjugate beam method and distributed long-gauge fibre Bragg grating (FBG) sensor. A lab experiment was conducted to verify the reliability and feasibility of this method under practical application. Further, the serviceability under different span-depth ratios and web thicknesses was examined through a finite element model.

  9. Committee VI.1. Extreme Hull Girder Loading

    DEFF Research Database (Denmark)

    Jensen, Jørgen Juncher

    2000-01-01

    Committee Mandate. Evaluate and develop direct calculation procedures for extreme wawe loads on ship hull girders. Due consideration shall be given to stochastic and non-linear effects. The procedures shall be assessed by comparison with in-service experiences, model tests and more refined...

  10. Effects of Adhesive Connection on Composite Action between FRP Bridge Deck and Steel Girder

    NARCIS (Netherlands)

    Jiang, X.; Luo, Chengwei; Qiang, X.; Kolstein, M.H.; Bijlaard, F.S.K.

    2017-01-01

    The FRP-steel girder composite bridge system is increasingly used in new constructions of bridges as well as rehabilitation of old bridges. However, the understanding of composite action between FRP decks and steel girders is limited and needs to be systematically investigated. In this paper,

  11. FINITE ELEMENT ANALYSIS OF TAPERED COMPOSITE PLATE GIRDER WITH A NON-LINEAR VARYING WEB DEPTH

    Directory of Open Access Journals (Sweden)

    Q. A. HASAN

    2017-11-01

    Full Text Available The paper presents Finite Element Analysis to determine the ultimate shear capacity of tapered composite plate girder. The effect of degree of taper on the ultimate shear capacity of tapered steel-concrete composite plate girder with a nonlinear varying web depth, effect of slenderness ratio on the ultimate shear capacity, and effect of flange stiffness on the ductility were considered as the parametric studies. Effect of concrete slab on the ultimate shear capacity of tapered plate girders was also considered and it was found to be so effective on the ultimate shear capacity of the tapered plate girder compared with the steel one. The accuracy of the finite element method is established by comparing the finite element with the results existing in the literature. The study was conducted using nonlinear finite element modelling with computer software LUSAS 14.7.

  12. Evaluation of continuity detail for precast prestressed girders.

    Science.gov (United States)

    2011-08-01

    The construction of highway bridges using precast prestressed concrete (PSC) girders is considered one of the most : economical construction alternatives because of the advantages they offer (e.g. reducing formwork and rapid construction). : Construc...

  13. End region detailing of pretensioned concrete bridge girders.

    Science.gov (United States)

    2013-03-01

    End region detailing has significant effect on the serviceability, behavior, and capacity of pretensioned concrete girders. : In this project, experimental and analytical research programs were conducted to evaluate and quantify the effects of : diff...

  14. Reliability Assessment for PSC Box-Girder Bridges Based on SHM Strain Measurements

    Directory of Open Access Journals (Sweden)

    Chuang Chen

    2017-01-01

    Full Text Available A reliability assessment method for prestressed concrete (PSC continuous box-girder bridges based on structural health monitoring (SHM strain measurements was proposed. First, due to the fact that measured strain was compositive and the variation periods of its components were different, a series of limit state equations under normal use limit state were given. Then, a linear fitting method was used to determine the relationship between the ambient temperature and the measured strain, which was aimed at extracting the vehicle load effect and the temperature load effect from the measured strain. Finally, according to the equivalent normalization method, the load effects unsatisfying the normal distribution by probability density function fitting were transformed, and the daily failure probabilities of monitored positions were calculated for evaluating the safety state of the girder. The results show that (1 the top plate of the box girder is more sensitive than the bottom plate to the high temperature, (2 the daily and seasonal strain variations induced by uniform temperature reveal an inconsistent tendency to the seasonal variation for mid-span cross sections, and (3 the generalized extreme value distribution is recommended for temperature gradient stress and vehicle induced stress fitting for box-girder bridges.

  15. Experimental testing of post-tensioned concrete girders instrumented with optical fibre gratings

    Science.gov (United States)

    Matthys, S.; Taerwe, L.

    2005-05-01

    The integration of optical fibre strain sensors in concrete structures in order to measure deformations has proven to be successful in several applications. Examples of monitored structures by the Magnel Laboratory for Concrete Research are a concrete girder bridge over the Ring Canal by Ghent, a Quay wall at the Ring Canal and a trough girder containing a railway track of a bridge [1,2]. Based on a joint research project the feasibility of integrating Bragg grating sensors in concrete in order to statically and dynamically monitor 17.6 m long prestressed concrete girders has been investigated. During the project 3 post-tensioned concrete girders were tested, submitting them to static and dynamic loading conditions and monitoring the structural behavior with several types of measuring devices, including accelerometers, Bragg gratings, Fabry-Perot gratings, deformeters, crack microscopes, etc. The obtained test results demonstrate the feasibility of optical strain sensors for both static and dynamic measurements. Though it was demonstrated, in the case of dynamic monitoring, that optical strain measurements can be used to directly measure the modal strains, the project also demonstrated that for prestressed concrete the variation in dynamic parameters was insufficient for adequate dynamic monitoring and related damage diagnostics.

  16. Dynamic response of a typical synchrotron magnet/girder assembly

    International Nuclear Information System (INIS)

    Jendrzejczyk, J.A.; Smith, R.K.; Vogt, M.E.

    1993-06-01

    In the Advanced Photon Source, the synchrotron booster ring accelerates positrons to the required energy level of 7 GeV. The positrons are then injected into the storage ring where they continue to orbit for 10--15 h. The storage ring quadrupoles have very stringent vibration criteria that must be satisfied to ensure that beam emittance growth is within acceptable limits, viz., <10%. Because the synchrotron booster ring is not operated after particle insertion into the storage ring, its vibration response is not a critical issue relative to the performance of the storage ring beam. Nevertheless, the synchrotron pulses at a frequency of 2 Hz, and if a vibration response frequency of the synchrotron magnet/girder assembly were to coincide with the pulsation frequency or its near harmonics, large-amplitude motion could result, with the effect that it could compromise the operation of the synchrotron. Due to the complex dynamics of the synchrotron magnet/girder assembly, it is necessary to measure the dynamic response of a prototypic assembly and its components to ensure that the inherent dynamic response frequencies are not equal to 2 Hz or any near harmonics. Dynamic-response measurement of the synchrotron girder assembly and component magnets is the subject of this report

  17. DISTORTION ANALYSIS OF TILL -WALLED BOX GIRDERS

    African Journals Online (AJOL)

    NIJOTECH

    bridges, buildings, motor vehicles, ships and aircrafts. Due to thinness of the box walls, generalized loads applied to this structure give rise to warping and distortion of ..... Recommendation for Design of. Intermediate Diaphragms in Box. Girders, Transactions of Japanese. Society of Civil Engineers, Vol. 14,1984, pp 121-126.

  18. On the Influence of Hull Girder Flexibility on the Wave

    DEFF Research Database (Denmark)

    Seng, Sopheak; Andersen, Ingrid Marie Vincent; Jensen, Jørgen Juncher

    2012-01-01

    Numerical predictions and model test results of the wave induced bending moments in a 9,400 TEU post-Panamax container vessel are presented for two regular wave scenarios. Different numerical procedures have been applied: a linear and non-linear time-domain strip theory and a direct calculation (...... (CFD) solving the Navier-Stokes equations with the free surface captured by a volume-of-fluid (VOF) method. In all procedures the flexibility of the hull girder is modelled as a non-uniform Timoshenko beam. It is observed that the non-linear models agree well with the model tests...... and as there is no occurrence of severe slamming in the cases considered, the inexpensive non-linear strip theory is as accurate as the direct CFD calculation method. In a comparison with the results using the rigid body assumption, the increase in the vertical bending moment (VBM) amidships due to the flexibility of the hull...... girder is found to be approximately 7% (peak-to-peak amplitude) in general. The non-linear responses, however, contain over-harmonic frequencies which may coincide with the natural frequency of the two-node vertical bending mode inducing resonance. In that case the hull girder flexibility causes...

  19. The Vibration Based Fatigue Damage Assessment of Steel and Steel Fiber Reinforced Concrete (SFRC Composite Girder

    Directory of Open Access Journals (Sweden)

    Xu Chen

    2015-01-01

    Full Text Available The steel-concrete composite girder has been usually applied in the bridge and building structures, mostly consisting of concrete slab, steel girder, and shear connector. The current fatigue damage assessment for the composite girder is largely based on the strain values and concrete crack features, which is time consuming and not stable. Hence the vibration-based fatigue damage assessment has been considered in this study. In detail, a steel-steel fiber reinforced concrete (SFRC composite girder was tested. The steel fiber reinforced concrete is usually considered for dealing with the concrete cracks in engineering practice. The composite girder was 3.3m long and 0.45m high. The fatigue load and impact excitation were applied on the specimen sequentially. According to the test results, the concrete crack development and global stiffness degradation during the fatigue test were relatively slow due to the favourable performance of SFRC in tension. But on the other hand, the vibration features varied significantly during the fatigue damage development. Generally, it confirmed the feasibility of executing fatigue damage assessment of composite bridge based on vibration method.

  20. Self-Consolidating Concrete for Prestressed Bridge Girders : Research Brief

    Science.gov (United States)

    2017-08-01

    Self-consolidating concrete (SCC) is commonly used as an alternative to conventional concrete (CC) in precast, prestressed concrete (PSC) bridge girders. The high strength, highly workable mixture can flow through dense reinforcement to fill formwork...

  1. Design of a Maglev Vibration Test Platform for the Research of Maglev Vehicle-girder Coupled Vibration Problem

    Directory of Open Access Journals (Sweden)

    Zhou Danfeng

    2017-01-01

    Full Text Available The maglev vehicle-girder coupled vibration problem has been encountered in many maglev test or commercial lines, which significantly degrade the performance of the maglev train. In previous research on the principle of the coupled vibration problem, it has been discovered that the fundamental model of the maglev girder can be simplified as a series of mass-spring resonators of different but related resonance frequencies, and that the stability of the vehicle-girder coupled system can be investigated by separately examining the stability of each mass-spring resonator – electromagnet coupled system. Based on this conclusion, a maglev test platform, which includes a single electromagnetic suspension control system, is built for experimental study of the coupled vibration problem. The guideway of the test platform is supported by a number of springs so as to change its flexibility. The mass of the guideway can also be changed by adjusting extra weights attached to it. By changing the flexibility and mass of the guideway, the rules of the maglev vehicle-girder coupled vibration problem are to be examined through experiments, and related theory on the vehicle-girder self-excited vibration proposed in previous research is also testified.

  2. Impact response of RC rock-shed girder with sand cushion under falling load

    International Nuclear Information System (INIS)

    Bhatti, Abdul Qadir; Kishi, Norimitsu

    2010-01-01

    Research highlights: → An applicability of FE model of RC girders with sand cushion has been investigated. → Experimental and numerical results of Impact force, reaction force and displacement have been performed. → Cracks obtained from numerical models are in good agreement with the experimental ones. → Reaction force-displacement loops agree well between numerical and experimental results. → The configuration of the hysteretic loop at failure of RC girders can be approximated by a parallelogram. - Abstract: In order to establish a proper finite element model of prototype RC girder with sand element for impact response analysis, dynamic response analysis of RC girders with sand cushion subjected to impact force due to weight falling from the height of H = 2.5, 5, 7.5 and 10 m was performed to improve the state of the art of protective design for real scale rock-sheds by using LS-DYNA code. An applicability of proposed model was discussed comparing with experimental results (e.g. impact force, reaction force and displacement waves). From this study, dynamic characteristics of impact response can be better simulated by using the proposed model. As a result, when the sand cushion was set up, the impact force, reaction force, mid-span displacement waves, distribution of reaction force-displacement loops, and crack patterns obtained from the numerical analysis are in good agreement with those from the experimental results.

  3. Optimization of the box-girder of overhead crane with constrained ...

    African Journals Online (AJOL)

    haroun

    Keywords: Overhead crane - Box-girder - New bat algorithm - level of ... much more efficiency and robustness compared to the genetic algorithm (GA) and PSO ...... optimization: developments, applications and resources," in Evolutionary.

  4. Shear in high strength concrete bridge girders : technical report.

    Science.gov (United States)

    2013-04-01

    Prestressed Concrete (PC) I-girders are used extensively as the primary superstructure components in Texas highway bridges. : A simple semi-empirical equation was developed at the University of Houston (UH) to predict the shear strength of PC I-girde...

  5. Design and construction of a cable-stayed composite girder bridge with precast RC-slabs; Purekyasuto shohan gosei keta shachokoyo no sekkei to seko

    Energy Technology Data Exchange (ETDEWEB)

    Maeda, K. [Tokyo Metropolitan Univ. (Japan). Faculty of Technology; Shimura, T.; Tachibana, Y.; Echigo, S. [Kawada Industries Inc., Tokyo (Japan)

    1995-09-20

    A report on design and execution of cable-stayed composite girder bridge with precast RC-slabs constructed first in Japan though in small scale was described. This bridge adopted steel slabs relatively low in slab height for main slab and with two boxes slab section, and was designed at an aim of being more economic and shorter in its working term in comparison with steel girder slab type, on a base of the design in a region allowable with the existing design standards. This bridge is mainly in accordance with the regulation on continuous bridge in the prescription of road bridge, and is designed for normal RC-girder selecting between girder supports to direction normal to bridge axis as usual without using specially strong concrete to the girder. And, in order to fill with the regulation on allowable tensile stress on considering effects of creep and drying shrinkage, a method adding prestress to the slabs was adopted. Furthermore, a loop-like overlap joint for cable joint for the precast girders, expansion concrete for joint portion to compose the girder with the steel slab and so forth were adopted. 12 refs., 22 figs., 5 tabs.

  6. Development of guidelines for transportation of long prestressed concrete girders.

    Science.gov (United States)

    2016-12-01

    This research study investigates the behavior of two long prestressed concrete girders during lifting and : transportation from the precast yard to the bridge site, with a particular focus on cracking concerns : during transport. Different response m...

  7. Flexural and Shear Behavior of FRP Strengthened AASHTO Type Concrete Bridge Girders

    Directory of Open Access Journals (Sweden)

    Nur Yazdani

    2016-01-01

    Full Text Available Fiber-reinforced polymers (FRP are being increasingly used for the repair and strengthening of deteriorated or unsafe concrete structures, including structurally deficient concrete highway bridges. The behavior of FRP strengthened concrete bridge girders, including failure modes, failure loads, and deflections, can be determined using an analytical finite element modeling approach, as outlined in this paper. The differences in flexural versus shear FRP strengthening and comparison with available design guidelines are also beneficial to design professionals. In this paper, a common AASHTO type prestressed concrete bridge girder with FRP wrapping was analyzed using the ANSYS FEM software and the ACI analytical approach. Both flexural and shear FRP applications, including vertical and inclined shear strengthening, were examined. Results showed that FRP wrapping can significantly benefit concrete bridge girders in terms of flexure/shear capacity increase, deflection reduction, and crack control. The FRP strength was underutilized in the section selected herein, which could be addressed through decrease of the amount of FRP and prestressing steel used, thereby increasing the section ductility. The ACI approach produced comparable results to the FEM and can be effectively and conveniently used in design.

  8. Evaluation of continuity detail for precast prestressed girders : tech summary.

    Science.gov (United States)

    2011-08-01

    Building multi-simple span bridges using precast prestressed concrete girders is an easy construction. However, the existence of : expansion joints often leads to a host of problems in their vicinity due to drainage leaks. Furthermore, debris accumul...

  9. Shear Behavior of Corrugated Steel Webs in H Shape Bridge Girders

    Directory of Open Access Journals (Sweden)

    Qi Cao

    2015-01-01

    Full Text Available In bridge engineering, girders with corrugated steel webs have shown good mechanical properties. With the promotion of composite bridge with corrugated steel webs, in particular steel-concrete composite girder bridge with corrugated steel webs, it is necessary to study the shear performance and buckling of the corrugated webs. In this research, by conducting experiment incorporated with finite element analysis, the stability of H shape beam welded with corrugated webs was tested and three failure modes were observed. Structural data including load-deflection, load-strain, and shear capacity of tested beam specimens were collected and compared with FEM analytical results by ANSYS software. The effects of web thickness, corrugation, and stiffening on shear capacity of corrugated webs were further discussed.

  10. Alignment and girder position of MSE septa in the new LSS4 extraction channel of the SPS

    CERN Document Server

    Balhan, B; Rizzo, A; Weterings, W; CERN. Geneva. SPS and LHC Division

    2002-01-01

    For the extraction of the beam from the Super Proton Synchrotron (SPS) to ring 2 of the Large Hadron Collider (LHC) and the CERN Neutrino to Gran Sasso (CNGS)facility, a new fast-extraction system is being constructed in the long straight section LSS4 of the SPS. Besides extraction bumpers, enlarged aperture quadrupoles and extraction kicker magnets (MKE), six conventional DC septum magnets (MSE) are used. These magnets are mounted on a single rigid support girder, pre-aligned so as to follow the trajectory of the extracted beam and optimise the available aperture. The girder has been motorised in order to optimise the local SPS aperture during setting up, so as to avoid the risk of circulating beam impact on the septum coils. In this note, we briefly present the trajectory and apertures of the beam, we describe the calculations and methods that have been used to determine the magnet position on the girder, and finally we report on the details of the girder movement and alignment.

  11. Onboard monitoring of fatigue damage rates in the hull girder

    DEFF Research Database (Denmark)

    Nielsen, Ulrik Dam; Jensen, Jørgen Juncher; Pedersen, Preben Terndrup

    2011-01-01

    Most new advanced ships have extensive data collection systems to be used for continuous monitoring of engine and hull performance, for voyage performance evaluation etc. Such systems could be expanded to include also procedures for stress monitoring and for decision support, where the most...... critical wave-induced ship extreme responses and fatigue damage accumulation can be estimated for hypothetical changes in ship course and speed in the automatically estimated wave environment.The aim of this paper is to outline a calculation procedure for fatigue damage rate prediction in hull girders...... taking into account whipping stresses. It is conceptually shown how such a method, which integrates onboard estimation of sea states, can be used to deduce decision support with respect to the accumulated fatigue damage in the hull girder.The paper firstly presents a set of measured full-scale wave...

  12. Extension of POA based on Fiber Element to Girder Bridge

    International Nuclear Information System (INIS)

    Li Zhenxin; Qiang Shizhong

    2010-01-01

    Because of its main advantage of simplicity, practicality, lower computational cost and relative good results Pushover analysis (POA) has become an effective analytical tool during the last decade for the seismic assessment of buildings. But such work on bridges has been very limited. Hence, the aim of this study is to adapt POA for nonlinear seismic analysis of girder bridges, and investigate its applicability in the case of an existing river-spanning approach bridge. To three different types bridge models the nonlinear POA, which adopts fiber model nonlinear beam-column element based on flexibility approach, with return period about 2500 years is carried out. It can be concluded that POA is applicable for bridges, with some shortcomings associated with the method in general, even when it is applied for buildings. Finally the applicable selection for monitoring point and lateral load pattern is suggested according to dynamic characteristic of girder bridges.

  13. Composite Action in Prestressed NU I-Girder Bridge Deck Systems Constructed with Bond Breakers to Facilitate Deck Removal : Technical Summary

    Science.gov (United States)

    2017-11-01

    Results are reported from tests of small-scale push-off and large-scale composite NU I-girder specimens conducted to establish an interface connection detail that (1) Facilitates in-situ removal of the bridge deck without damaging prestressed girders...

  14. Damage identification method for continuous girder bridges based on spatially-distributed long-gauge strain sensing under moving loads

    Science.gov (United States)

    Wu, Bitao; Wu, Gang; Yang, Caiqian; He, Yi

    2018-05-01

    A novel damage identification method for concrete continuous girder bridges based on spatially-distributed long-gauge strain sensing is presented in this paper. First, the variation regularity of the long-gauge strain influence line of continuous girder bridges which changes with the location of vehicles on the bridge is studied. According to this variation regularity, a calculation method for the distribution regularity of the area of long-gauge strain history is investigated. Second, a numerical simulation of damage identification based on the distribution regularity of the area of long-gauge strain history is conducted, and the results indicate that this method is effective for identifying damage and is not affected by the speed, axle number and weight of vehicles. Finally, a real bridge test on a highway is conducted, and the experimental results also show that this method is very effective for identifying damage in continuous girder bridges, and the local element stiffness distribution regularity can be revealed at the same time. This identified information is useful for maintaining of continuous girder bridges on highways.

  15. Continuous prestressed concrete girder bridges, volume 2 : analysis, testing, and recommendations.

    Science.gov (United States)

    2016-12-01

    The Texas Department of Transportation designs typical highway bridge structures as simple span systems using : standard precast, pretensioned girders. Spans are limited to about 150 ft due to weight and length restrictions on : transporting the prec...

  16. Continuity diaphragm for skewed continuous span precast prestressed concrete girder bridges.

    Science.gov (United States)

    2004-10-01

    Continuity diaphragms used on skewed bents in prestressed girder bridges cause difficulties in detailing and : construction. Details for bridges with large diaphragm skew angles (>30) have not been a problem for LA DOTD. : However, as the skew angl...

  17. Continuous prestressed concrete girder bridges volume 1 : literature review and preliminary designs.

    Science.gov (United States)

    2012-06-01

    The Texas Department of Transportation (TxDOT) is currently designing typical highway bridge structures as simply supported using standard precast, pretensioned girders. TxDOT is interested in developing additional economical design alternatives for ...

  18. Optimization of the box-girder of overhead crane with constrained ...

    African Journals Online (AJOL)

    Keywords: Overhead crane - Box-girder - New bat algorithm - level of comparison - Higher strength steel. Optimisation de poutre caisson de pont roulant avec un nouvel algorithme de chauve souris sous contrainte. Une conception optimale pour un poids minimal de la poutre principale d'un pont roulant peut réduire ...

  19. Full scale test of a SSP 34m box girder 1. Data report; Reinforced glass fiber/expoxy used in wind turbine blades

    Energy Technology Data Exchange (ETDEWEB)

    Jensen, Find M.; Branner, K.; Nielsen, Per H. (and others)

    2008-03-15

    This report presents the setup and result of a full-scale test of a reinforced glass fibre/epoxy box girder used in 34m wind turbine blade. The tests were performed at the Blaest test facility in August 2006. The test is an important part of a research project established in cooperation between Risoe DTU, the National Laboratory for Sustainable Energy at the Technical University of Denmark -, SSP-Technology A/S and Blaest (Blade test centre A/S) and it has been performed as a part of Find Moelholt Jensen's PhD study. This report contains the complete test data for the final test, in which the box girder was loaded until failure. A comprehensive description of the test setup is given. This report deals only with tests and results. There are no conclusions on the data in this report, but references are given to publications, where the data are used and compared with FEM etc. Various kinds of measuring equipment have been used during these tests: acoustic emission, 330 strain gauges, 24 mechanical displacement devices and two optical deformation measuring systems. The mechanical displacement devices measured both global (absolute) and local (relative) deflection and the optical systems measured surface deformation. A prediction was made on the location of the failure of the girder. At this location the majority of the measuring equipment was concentrated. The prediction was proved to be correct and valuable information of the behaviour of the box girder prior to failure was obtained. The experimental investigation consisted of the following load configurations: -Flapwise bending -Torsion Ultrasonic scanning of the box girder was performed before, during and after the test the box girder. This was done to investigate whether the girder was damaged by the load or imperfection (productions defects) growth. (au)

  20. Shear evaluation of tapered bridge girder panels with steel corrugated webs near the supports of continuous bridges

    OpenAIRE

    Zevallos, E.; Hassanein, M.F.; Real Saladrigas, Esther; Mirambell Arrizabalaga, Enrique

    2016-01-01

    Because of public construction budgets were cut over the last few years, new bridge girders with corrugated webs to reduce the construction costs have become more widely studied and used. In spite that tapered bridge girders with corrugated webs (BGCWs) are used in modern bridges, their shear strength and behaviour rarely exists in literature. Based on available literature, the web of the linearly tapered BGCWs may be divided into three typologies with different structural response to shear f...

  1. A new solution of measuring thermal response of prestressed concrete bridge girders for structural health monitoring

    International Nuclear Information System (INIS)

    Jiao, Pengcheng; Borchani, Wassim; Hasni, Hassene; Lajnef, Nizar

    2017-01-01

    This study develops a novel buckling-based mechanism to measure the thermal response of prestressed concrete bridge girders under continuous temperature changes for structural health monitoring. The measuring device consists of a bilaterally constrained beam and a piezoelectric polyvinylidene fluoride transducer that is attached to the beam. Under thermally induced displacement, the slender beam is buckled. The post-buckling events are deployed to convert the low-rate and low-frequency excitations into localized high-rate motions and, therefore, the attached piezoelectric transducer is triggered to generate electrical signals. Attaching the measuring device to concrete bridge girders, the electrical signals are used to detect the thermal response of concrete bridges. Finite element simulations are conducted to obtain the displacement of prestressed concrete girders under thermal loads. Using the thermal-induced displacement as input, experiments are carried out on a 3D printed measuring device to investigate the buckling response and corresponding electrical signals. A theoretical model is developed based on the nonlinear Euler–Bernoulli beam theory and large deformation assumptions to predict the buckling mode transitions of the beam. Based on the presented theoretical model, the geometry properties of the measuring device can be designed such that its buckling response is effectively controlled. Consequently, the thermally induced displacement can be designed as limit states to detect excessive thermal loads on concrete bridge girders. The proposed solution sufficiently measures the thermal response of concrete bridges. (paper)

  2. A new solution of measuring thermal response of prestressed concrete bridge girders for structural health monitoring

    Science.gov (United States)

    Jiao, Pengcheng; Borchani, Wassim; Hasni, Hassene; Lajnef, Nizar

    2017-08-01

    This study develops a novel buckling-based mechanism to measure the thermal response of prestressed concrete bridge girders under continuous temperature changes for structural health monitoring. The measuring device consists of a bilaterally constrained beam and a piezoelectric polyvinylidene fluoride transducer that is attached to the beam. Under thermally induced displacement, the slender beam is buckled. The post-buckling events are deployed to convert the low-rate and low-frequency excitations into localized high-rate motions and, therefore, the attached piezoelectric transducer is triggered to generate electrical signals. Attaching the measuring device to concrete bridge girders, the electrical signals are used to detect the thermal response of concrete bridges. Finite element simulations are conducted to obtain the displacement of prestressed concrete girders under thermal loads. Using the thermal-induced displacement as input, experiments are carried out on a 3D printed measuring device to investigate the buckling response and corresponding electrical signals. A theoretical model is developed based on the nonlinear Euler-Bernoulli beam theory and large deformation assumptions to predict the buckling mode transitions of the beam. Based on the presented theoretical model, the geometry properties of the measuring device can be designed such that its buckling response is effectively controlled. Consequently, the thermally induced displacement can be designed as limit states to detect excessive thermal loads on concrete bridge girders. The proposed solution sufficiently measures the thermal response of concrete bridges.

  3. Structural Health Monitoring and Time-Dependent Effects Analysis of Self-Anchored Suspension Bridge with Extra-Wide Concrete Girder

    Directory of Open Access Journals (Sweden)

    Guangpan Zhou

    2018-01-01

    Full Text Available The present work is aimed at studying the structural health status of Hunan Road Bridge, which is currently the widest concrete self-anchored suspension bridge in China. The monitoring data included the structural deformations, internal forces, and vibration characteristics from April 2015 to April 2016 were analyzed to evaluate the structural changes and safety. The influences brought by the ambient temperature changes and the dual effects composed of concrete shrinkage & creep (S&C and seasonal temperature changes were analyzed based on the measured data. The long-time effects of concrete S&C were predicted using the CEB-FIP 90 model and the age-adjusted effective modulus method based on the ANSYS beam finite element model. The measured data showed that the transverse displacements of towers were more significant than the longitudinal ones. The spatial effect of the extra-wide girder is significant, which performs as the longitudinal stresses change unevenly along the transverse direction. The seasonal ambient warming caused overall increases in girder compressive stresses, and the cooling resulted in decreases along with significant temperature gradient effects. The prediction results show that the cable anchoring positions at girder ends and tower tops will move towards the mid-span affected by concrete S&C. In terms of the middle region of mid-span girder, significant increases in longitudinal stresses of top plate and decreases in the ones of bottom plate will be caused by the significant deflection. Comprehensively, the increases in the girder compressive stresses of side-span bottom plate and mid-span top plate are worthy of attention when confronted with extreme high temperature during the bridge service life cycle.

  4. STUDY, EVALUATION AND TEST OF SUBMODULE TO GIRDER BOLTED JOINT

    CERN Document Server

    Blocki, J; Miralles, Ll; Topilin, N D

    2000-01-01

    The object of the present work is to study the bolted joint submodule to girder. This joint is critical from the point of view of the mechanical integrity of the Tilecal Barrel and Extended Barrel modules and LAr Endcaps. Theoretical analysis, FEM calculations and tests have been carried out in order to find a solution that fulfils the safety factors design criteria.

  5. Proposal and study of a long-span composite cable-stayed bridge with new hybrid girder; Atarashii gosei kozo shuketa wo mochiita chodai fukugo shachokyo no kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    Yoshida, K.; Hishiki, Y.; Furuichi, K. [Kajima Corp., Tokyo (Japan)

    1999-09-30

    A hybrid or mixed structure (composite structures) are a matter of increasing concern which takes in each advantage of steel and concrete. A field of bridges is no exception, with the plan and construction carried out for the new type of composite bridge, such as a composite cable-stayed bridge and a composite extra dose bridge as a long span bridge, and a composite truss bridge and a corrugated steel plate web bridge as a medium-span bridge, with technological development becoming active in this field. In such a technological trend, a hybrid two-girder structure was devised, a structure consisting of a concrete filled steel pipe for a girder and a precast (PC) floor plate for a floor board, as the girder structure of a long-span cable-stayed bridge in the subject research; also, applicability was examined using, as an example, the composite cable-stayed bridge with hybrid girders employed for the span. This paper reports the result of the analysis of the entire system, the analysis made for the purpose of examining the characteristic and the feasibility of this hybrid girder. The analysis revealed the structural feasibility of the long-span composite cable-stayed bridge using two hybrid girders of concrete-filled steel pipes thus devised. (NEDO)

  6. STRENGTHENING CONCRETE HOLLOW SECTION GIRDER BRIDGE USING POLYURETHANE-CEMENT MATERIAL (PART B

    Directory of Open Access Journals (Sweden)

    Haleem K. Hussain

    2018-01-01

    Full Text Available This paper presents experimental study to retrofitted reinforced concrete Hollow Section Bridge. The study was carried out on the White River Bridge structure (Bai xi da Qiao / China. The effect of retrofitting on stress and strain of beams at the critical section was studied. Evaluating the bridges girder after strengthening using new material called PolyurethaneCement material (PUC as an external material .This study present the strain and deflection before and after strengthening the bridge girders. The results has shown that the overall state of the bridge structural strengthening is in good condition. The enhancement was significant in stiffness of the bridge structure. Regarding to the results of static load test, the experimental values strain and deflection are less than theoretical values, indicating that the stiffness of the structure, overall deformation and integrity satisfy the designed and standard requirements and the working performance are in good condition, and flexure capacity has a certain surplus.

  7. Investigation and Control of VIVs with Multi-Lock-in Regions on Wide Flat Box Girders

    Directory of Open Access Journals (Sweden)

    Bo Wu

    2017-01-01

    Full Text Available On the preliminary designing of a wide flat box girder with the slenderness ratio 12, vertical and torsional vortex-induced vibrations (VIV are observed in wind tunnel tests. More than one lock-in region, which are defined as “multi-lock-in regions,” are recorded. Therefore, suspicions should be aroused regarding the viewpoint that wide box girders are aerodynamic friendly. As the three nascent vortexes originating at the pedestrian guardrails and inspection rails shed to near-wake through different pathways with different frequencies, the mechanisms of VIVs and multi-lock-in regions are analyzed to be determined by the inappropriate subsidiary structures. A hybrid method combining Large Eddy Simulation (LES with experimental results is introduced to study the flow-structure interactions (FSI when undergoing VIVs; the vortex mode of torsional VIV on wide flat box girders is defined as “4/2S,” which is different from any other known ones. Based on the mechanism of VIV, a new approach by increasing ventilation rate of the pedestrian guardrails is proved to be effective in suppressing vertical and torsional VIVs, and it is more feasible than other control schemes. Then, the control mechanisms are deeper investigated by analyzing the evolution of vortex mode and FSI using Hybrid-LES method.

  8. Evaluation of a highway bridge constructed using high strength lightweight concrete bridge girders.

    Science.gov (United States)

    2011-04-01

    The use of high performance concretes to provide longer bridge spans has been limited due to the capacity of existing infrastructure to handle the load of the girders during transportation. The use of High Strength Lightweight Concrete (HSLW) can pro...

  9. Experiments and theory on deck and girder crushing

    DEFF Research Database (Denmark)

    Simonsen, Bo Cerup; Ocakli, Hasan

    1999-01-01

    -deflection curves and modes of deformation for decks, stringer decks and deep thin-walled beams subjected to central or excentric point loads between transverse frames. Based on theory and experiments, various modelling aspects of the local/global failure of the beams are discussed. The agreement between......This paper is concerned with theoretical and experimental analysis of deep plastic collapse of a deck or deep girder subjected to an in-plane, concentrated load. A theory is derived which is valid until initition of fracture in the structure. The presented experimental results show load...

  10. Sensitivity and statistical analysis within the elaboration of steel plated girder resistance

    Czech Academy of Sciences Publication Activity Database

    Melcher, J.; Škaloud, Miroslav; Kala, Z.; Karmazínová, M.

    2009-01-01

    Roč. 5, č. 2 (2009), s. 120-126 ISSN 1816-112X. [International conf. on steel and aluminium structures /6./. Oxford, 24.06.2007-27.06.2007] Institutional research plan: CEZ:AV0Z20710524 Keywords : steel structures * fatigue * sensitivity * imperfection * plated girder Subject RIV: JM - Building Engineering

  11. Full Scale Test of a SSP 34m box girder 1. Data report

    DEFF Research Database (Denmark)

    Jensen, Find Mølholt; Branner, Kim; Nielsen, Per Hørlyk

    This report presents the setup and result of a full-scale test of a reinforced glass fibre/epoxy box girder used in 34m wind turbine blade. The tests were performed at the Blaest test facility in August 2006. The test is an important part of a research project established in cooperation between...... Risø DTU, the National Laboratory for Sustainable Energy at the Technical University of Denmark -, SSP-Technology A/S and Blaest (Blade test centre A/S) and it has been performed as a part of Find Mølholt Jensen‟s PhD study. This report contains the complete test data for the final test, in which...... the box girder was loaded until failure. A comprehensive description of the test setup is given. This report deals only with tests and results. There are no conclusions on the data in this report, but references are given to publications, where the data are used and compared with FEM etc. Various kinds...

  12. Wireless Impedance Sensor with PZT-Interface for Prestress-Loss Monitoring in Prestressed Concrete Girder

    International Nuclear Information System (INIS)

    Nguyen, Khac Duy; Lee, So Young; Kim, Jeong Tae

    2011-01-01

    Ensuring the designed prestress force is very important for the safety of prestressed concrete bridge. The loss of prestress force in tendon could significantly reduce load carrying capacity of the structure. In this study, an automated prestress-loss monitoring system for prestressed concrete girder using PZT-interface and wireless impedance sensor node is presented. The following approaches are carried out to achieve the objective. Firstly, wireless impedance sensor nodes are designed for automated impedance-based monitoring technique. The sensor node is mounted on the high-performance Imote2 sensor platform to fulfill high operating speed, low power requirement and large storage memory. Secondly, a smart PZT-interface designed for monitoring prestress force is described. A linear regression model is established to predict prestress-loss. Finally, a system of the PZT-interface interacted with the wireless sensor node is evaluated from a lab-scale tendon-anchorage connection of a prestressed concrete girder

  13. Long-Term Vibration Monitoring of the Effects of Temperature and Humidity on PC Girders with and without Fly Ash considering ASR Deterioration

    Directory of Open Access Journals (Sweden)

    Tuan Minh Ha

    2017-01-01

    Full Text Available Structural responses have been used as inputs in the evaluation procedures of civil structures for years. Apart from the degradation of a structure itself, changes in the environmental conditions affect its characteristics. For adequate maintenance, it is necessary to quantify the environment-induced changes and discriminate them from the effects due to damage. This study investigates the variation in the vibration responses of prestressed concrete (PC girders, which were deteriorated because of the alkali–silica reaction (ASR, concerning ambient temperature and humidity. Three PC girders were exposed to outdoor weather conditions outside the laboratory, one of which had a selected amount of fly ash in its mixture to mitigate the ASR. The girders were periodically vibration tested for one and a half years. It was found that when the temperature and humidity increased, the frequencies and damping ratios decreased in proportion. No apparent variation in the mode shapes could be identified. A finite element model was proposed for numerical verification, the results of which were in good agreement with the measured changes in the natural frequencies. Moreover, the different dynamic performances of the three specimens indicated that the fly ash significantly affected the vibrations of the PC girders under ASR deterioration.

  14. Statistical determination of significant curved I-girder bridge seismic response parameters

    Science.gov (United States)

    Seo, Junwon

    2013-06-01

    Curved steel bridges are commonly used at interchanges in transportation networks and more of these structures continue to be designed and built in the United States. Though the use of these bridges continues to increase in locations that experience high seismicity, the effects of curvature and other parameters on their seismic behaviors have been neglected in current risk assessment tools. These tools can evaluate the seismic vulnerability of a transportation network using fragility curves. One critical component of fragility curve development for curved steel bridges is the completion of sensitivity analyses that help identify influential parameters related to their seismic response. In this study, an accessible inventory of existing curved steel girder bridges located primarily in the Mid-Atlantic United States (MAUS) was used to establish statistical characteristics used as inputs for a seismic sensitivity study. Critical seismic response quantities were captured using 3D nonlinear finite element models. Influential parameters from these quantities were identified using statistical tools that incorporate experimental Plackett-Burman Design (PBD), which included Pareto optimal plots and prediction profiler techniques. The findings revealed that the potential variation in the influential parameters included number of spans, radius of curvature, maximum span length, girder spacing, and cross-frame spacing. These parameters showed varying levels of influence on the critical bridge response.

  15. Discussion on the installation checking method of precast composite floor slab with lattice girders

    Science.gov (United States)

    Chen, Li; Jin, Xing; Wang, Yahui; Zhou, Hele; Gu, Jianing

    2018-03-01

    Based on the installation checking requirements of China’s current standards and the international norms for prefabricated structural precast components, it proposed an installation checking method for precast composite floor slab with lattice girders. By taking an equivalent composite beam consisted of a single lattice girder and the precast concrete slab as the checking object, compression instability stress of upper chords and yield stress of slab distribution reinforcement at the maximum positive moment, tensile yield stress of upper chords, slab normal section normal compression stress and shear instability stress of diagonal bars at the maximum negative moment were checked. And the bending stress and deflection of support beams, strength and compression stability bearing capacity of the vertical support, shear bearing capacity of the bolt and compression bearing capacity of steel tube wall at the bolt were checked at the same time. Every different checking object was given a specific load value and load combination. Application of installation checking method was given and testified by example.

  16. Creep analysis and torsional vibration analysis of cable-stayed bridges with two edge composite girders; Nishuketa gosei kozo shachokyo no creep kaiseki to nejiri shindo kaiseki

    Energy Technology Data Exchange (ETDEWEB)

    Hoshino, M. [Nihon University, Tokyo (Japan). College of Science and Technology

    1996-07-21

    This paper describes the creep analysis and torsional vibration analysis of cable-stayed bridges with two edge composite girders. The girder is composed of the concrete slab and the steel girder. I-girders are placed at both edges of the profile. Such a type of bridge was investigated. As the stress migrates by the creep of concrete slab, it is necessary to evaluate the influence of this creep precisely in designing. In the analysis, the composite girder was expressed not by the single member, but by the binary member consisting of concrete member and steel member. Two methods were employed, i.e., method A in which both members are connected by the rigid body beam and method B in which the profile of concrete is converted into the profile of steel. The method A provided better accuracy, but the method B was often sufficient. Torsional rigidity of the open profile structure was much smaller than that of the box profile. As the torsional natural frequency was low, proper torsional vibration analysis was indispensable especially from the viewpoint of wind resistance. Two methods were employed, which utilize the vibration analysis method for general space frame structures. Results of both methods were agreed mutually, but the second method provided better calculation efficiency. 10 refs., 9 figs., 6 tabs.

  17. Estimation of hull girder vertical bending moments including non-linear and flexibility effects using closed form expressions

    DEFF Research Database (Denmark)

    Pedersen, Preben Terndrup; Jensen, Jørgen Juncher

    2009-01-01

    A simple but rational procedure for prediction of extreme wave-induced hull girder bending moment is presented. The procedure takes into account main ship hull characteristics such as: length, breadth, draught, block coefficient, bow flare coefficient, forward speed and hull flexibility. The wave......-linear strip theory calculations and supplemented with new closed form results for the hogging bending moment. Focus is on the extreme hull girder hogging bending moment. Due to the few input parameters this procedure can be used to estimate the wave-induced bending moments at the conceptual design phase....... Another application area is for novel single hull ship types not presently covered by the rules of the classification societies. As one application example the container ship M/S Napoli is considered....

  18. Strength and durability of near-surface mounted CFRP bars for shear strengthening reinforced concrete bridge girders.

    Science.gov (United States)

    2012-03-01

    During the interstate expansion of the 1950s, many conventionally reinforced concrete deck girder bridges were built throughout the country. These aging bridges commonly exhibit diagonal cracking and rate inadequately for shear, thus they are candida...

  19. Research on structural dynamic characteristics of continuous steel box girder-bridge with lager ratio of wide-span

    Directory of Open Access Journals (Sweden)

    Yin Haijun

    2018-01-01

    Full Text Available Structure natural frequency and mode of vibration can not only reflect the structure modal parameters of dynamic properties, but also incarnate the dynamic evaluation characteristics of bridge structure. This paper applies ANSYS to establish the finite element model based on a continuous steel box girder bridge in order to obtain the corresponding modal analysis parameters. Through the environmental stimulation test, The results show that height of the steel box girder and the setting of diaphragm plate is reasonable, transverse space of piers not merely provide enough support but also ensure lateral stability of the bridge, as well as offering aside the maximum lateral clearance of the existing road. Meanwhile, the calculation results have important engineering practical values. which can provide basic data for the design, construction and maintenance of similar Bridges.

  20. Aerodynamic stability study of a long-span prestressed concrete cable-stayed bridge. Aerodynamic behavior of edge box girder under uniform flow; Chodai PC shachokyo no taifu anteisei ni kansuru kenkyu. Ichiyoryuchu ni okeru edge girder keishiki no kuriki tokusei

    Energy Technology Data Exchange (ETDEWEB)

    Nomura, T. [Obayashi Corp., Tokyo (Japan)

    1999-01-10

    In recent years, the construction of long-span bridges is on the increase. Prestressed concrete cable-stayed bridges are dynamically very efficient structures of relatively low cost that blend in well with the landscape. Maintenance is also easy. Consequently, the adoption of edge box girders for cable-stayed bridges is increasing worldwide, but problems related to the aerodynamic stability of the structure have emerged. The aerodynamic stability of edge box girders for a prestressed concrete cable-stayed bridge was investigated under uniform flow conditions by conducting several wind tunnel experiments. As a result, the section of the bridge deck was optimized to prevent torsional flutter within an angle of attack varying from -5 to +5 degrees. It is therefore possible to guarantee the aerodynamic stability of long-span prestressed concrete cable-stayed bridges. (author)

  1. Double Girder Bridge Crane with Double Cycling: Scheduling Strategy and Performance Evaluation

    Directory of Open Access Journals (Sweden)

    Dandan Wang

    2014-01-01

    Full Text Available This paper introduces a novel quay crane design, double girder bridge crane (DGBC. DGBC is capable of handling containers of two adjacent bays simultaneously, avoiding crane collisions, saving travelling and reposition cost, and eventually improving terminal efficiency. This problem is formulated as a resource-constrained project scheduling with objective to minimize the maximum completion time. A two-stage heuristic algorithm is proposed in which an operating sequences on each bay is obtained by double cycling, and the integrated timetable for both bays is constructed by solving resource conflicts using the proposed minimum cost strategy. We examine effectiveness and performance of applying DGBC with double cycling. A case study is presented to illustrate how DGBC works with the two-stage method. Three extreme cases with respective conflict types are investigated to develop the performance bounds of DGBC with double cycling. The results show that DGBC can significantly improve terminal productivity, and outperforms single girder crane in both makespan and the lift operation percentage. The highest DGBC efficiency does not require maximum double cycles in two bay schedules; rather the integrated timetable for two bays is the main contribution to the DGBC performance as it yields better cooperation between two spreaders and the driver.

  2. Strength and durability of near-surface mounted CFRP bars for shear strengthening reinforced concrete bridge girders : appendices.

    Science.gov (United States)

    2012-01-01

    During the interstate expansion of the 1950s, many conventionally reinforced concrete deck girder bridges were built throughout the country. These aging bridges commonly exhibit diagonal cracking and rate inadequately for shear, thus they are candida...

  3. Environmental Durability of Reinforced Concrete Deck Girders Strengthened for Shear with Surface-Bonded Carbon Fiber-Reinforced Polymer

    Science.gov (United States)

    2009-05-01

    "This research investigated the durability of carbon fiber-reinforced polymer composites (CFRP) used for shear strengthening reinforced concrete deck girders. Large beams were used to avoid accounting for size effects in the data analysis. The effort...

  4. Strength and durability of near-surface mounted CFRP bars for shear strengthening reinforced concrete bridge girders : final report.

    Science.gov (United States)

    2012-03-01

    During the interstate expansion of the 1950s, many conventionally reinforced concrete deck girder bridges were built throughout the country. These aging bridges commonly exhibit diagonal cracking and rate inadequately for shear, thus they are candida...

  5. Maintained ship hull girder ultimate strength reliability considering corrosion and fatigue

    DEFF Research Database (Denmark)

    Hu, Yong; Cui, W.; Pedersen, Preben Terndrup

    2004-01-01

    The prupose of this paper is to propose a methodology to assess the time-variant ultimate strength of ship hull girder under the degradations of corrosion and fatigue. The effects of fatigue cracks on the tensile and compressive residual ultimate strength of stiffened panels and unstiffened plates......, webs and flanges, respectively. The effects of inspections and repair are taken into account. A minimum net thickness rule is used to determine repair policies. A procedure is proposed to determine the maximum allowable corrosion thickness of different parts of the hull cross section. The procedure...

  6. Strength and durability of near-surface mounted CFRP bars for shear strengthening reinforced concrete bridge girders : final report appendices.

    Science.gov (United States)

    2012-03-01

    During the interstate expansion of the 1950s, many conventionally reinforced concrete deck girder bridges were built throughout the country. These aging bridges commonly exhibit diagonal cracking and rate inadequately for shear, thus they are candida...

  7. Load Distribution Factors for Composite Multicell Box Girder Bridges

    Science.gov (United States)

    Tiwari, Sanjay; Bhargava, Pradeep

    2017-12-01

    Cellular steel section composite with a concrete deck is one of the most suitable superstructures in resisting torsional and warping effects induced by highway loading. This type of structure has inherently created new design problems for engineers in estimating its load distribution when subjected to moving vehicles. Indian Codes of Practice does not provide any specific guidelines for the design of straight composite concrete deck-steel multi-cell bridges. To meet the practical requirements arising during the design process, a simple design method is needed for straight composite multi-cell bridges in the form of load distribution factors for moment and shear. This work presents load distribution characteristics of straight composite multi-cell box girder bridges under IRC trains of loads.

  8. Dynamic Responses of Continuous Girder Bridges with Uniform Cross-Section under Moving Vehicular Loads

    OpenAIRE

    Gao, Qingfei; Wang, Zonglin; Jia, Hongyu; Liu, Chenguang; Li, Jun; Guo, Binqiang; Zhong, Junfei

    2015-01-01

    To address the drawback of traditional method of investigating dynamic responses of the continuous girder bridge with uniform cross-section under moving vehicular loads, the orthogonal experimental design method is proposed in this paper. Firstly, some empirical formulas of natural frequencies are obtained by theoretical derivation and numerical simulation. The effects of different parameters on dynamic responses of the vehicle-bridge coupled vibration system are discussed using our own progr...

  9. On the Effect of Hull Girder Flexibility on the Vertical Wave Bending Moment for Ultra Large Container Vessels

    DEFF Research Database (Denmark)

    Andersen, Ingrid Marie Vincent; Jensen, Jørgen Juncher

    2012-01-01

    Currently, a number of very large container ships are being built and more are on order, and some concerns have been expressed about the importance of the reduced hull girder stiffness to the wave-induced loads. The main concern is related to the fatigue life, but also a possible increase...... in the global hull girder loads as consequence of the increased hull flexibility must be considered. This is especially so as the rules of the classification societies do not explicitly account for the effect of hull flexibility on the global loads. In the present paper an analysis has been carried out...... in the waves. Slamming forces are determined by a standard momentum formulation. The hull flexibility is modelled as a nonprismatic Timoshenko beam. Generally, good agreement with experimental results and more accurate numerical predictions has previously been obtained in a number of studies. The statistical...

  10. FE-ANN based modeling of 3D Simple Reinforced Concrete Girders for Objective Structural Health Evaluation : Tech Transfer Summary

    Science.gov (United States)

    2017-06-01

    The objective of this study was to develop an objective, quantitative method for evaluating damage to bridge girders by using artificial neural networks (ANNs). This evaluation method, which is a supplement to visual inspection, requires only the res...

  11. Nonlinear Stability Analysis of a Composite Girder Cable-Stayed Bridge with Three Pylons during Construction

    Directory of Open Access Journals (Sweden)

    Xiaoguang Deng

    2015-01-01

    Full Text Available Based on the nonlinear stability analysis method, the 3D nonlinear finite element model of a composite girder cable-stayed bridge with three pylons is established to research the effect of factors including geometric nonlinearity, material nonlinearity, static wind load, and unbalanced construction load on the structural stability during construction. Besides, the structural nonlinear stability in different construction schemes and the determination of temporary pier position are also studied. The nonlinear stability safety factors are calculated to demonstrate the rationality and safety of construction schemes. The results show that the nonlinear stability safety factors of this bridge during construction meet the design requirement and the minimum value occurs in the maximum double cantilever stage. Besides, the nonlinear stability of the structure in the side of edge-pylon meets the design requirement in the two construction schemes. Furthermore, the temporary pier can improve the structure stability, effectively, and the actual position is reasonable. In addition, the local buckling of steel girder occurs earlier than overall instability under load in some cable tension stages. Finally, static wind load and the unbalanced construction load should be considered in the stability analysis for the adverse impact.

  12. Dynamic Magnification Factor in a Box-Shape Steel Girder

    Science.gov (United States)

    Rahbar-Ranji, A.

    2014-01-01

    The dynamic effect of moving loads on structures is treated as a dynamic magnification factor when resonant is not imminent. Studies have shown that the calculated magnification factors from field measurements could be higher than the values specified in design codes. It is the main aim of present paper to investigate the applicability and accuracy of a rule-based expression for calculation of dynamic magnification factor for lifting appliances used in marine industry. A steel box shape girder of a crane is considered and transient dynamic analysis using computer code ANSYS is implemented. Dynamic magnification factor is calculated for different loading conditions and compared with rule-based equation. The effects of lifting speeds, acceleration, damping ratio and position of cargo are examined. It is found that rule-based expression underestimate dynamic magnification factor.

  13. Hybrid knowledge expert tool for load capacity assessment of railway plate girders with defects

    Science.gov (United States)

    KuŻawa, M.; Bień, J.; Gładysz, M.

    2013-10-01

    Importance of the bridge structures as components of the transportation network is increasing and requires regular development of the management methodology. The main activities are focused on the safety of the users of the transportation network and on the safety of structures, based on monitoring and analysis of the bridge condition changes caused by various types of defects. The paper presents application of the hybrid network technology in the expert tool NOBLA supporting condition assessment of bridge plate girders, taking into account defects of the structures.

  14. Numerical analysis of dynamic response of vehicle–bridge coupled system on long-span continuous girder bridge

    Directory of Open Access Journals (Sweden)

    Lipeng An

    2016-07-01

    Full Text Available To systematically study the vehicle–bridge coupled dynamic response and its change rule with different parameters, a vehicle model with seven degrees of freedom was built and the total potential energy of vehicle space vibration system was deduced. Considering the stimulation of road roughness, the dynamic response equation of vehicle–bridge coupled system was established in accordance with the elastic system principle of total potential energy with stationary value and the “set-in-right-position” rule. On the basis of the self-compiled Fortran program and bridge engineering, the dynamic response of long-span continuous girder bridge under vehicle load was studied. This study also included the calculation of vehicle impact coefficient, evaluation of vibration comfort, and analysis of dynamic response parameters. Results show the impact coefficient changes with lane number and is larger than the value calculated by the “general code for design of highway bridges and culverts (China”. The Dieckmann index of bridge vibration is also related to lane number, and the vibration comfort evaluation is good in normal conditions. The relevant conclusions from parametric analyses have practical significance to dynamic design and daily operation of long-span continuous girder bridges in expressways. Safety and comfort are expected to improve significantly with further control of the vibration of vehicle–bridge system.

  15. Lateral dynamic interaction analysis of a train girder pier system

    Science.gov (United States)

    Xia, H.; Guo, W. W.; Wu, X.; Pi, Y. L.; Bradford, M. A.

    2008-12-01

    A dynamic model of a coupled train-girder-pier system is developed in this paper. Each vehicle in a train is modeled with 27 degrees-of-freedom for a 4-axle passenger coach or freight car, and 31 for a 6-axle locomotive. The bridge model is applicable to straight and curved bridges. The centrifugal forces of moving vehicles on curved bridges are considered in both the vehicle model and the bridge model. The dynamic interaction between the bridge and train is realized through an assumed wheel-hunting movement. A case study is performed for a test train traversing two straight and two curved multi-span bridges with high piers. The histories of the train traversing the bridges are simulated and the dynamic responses of the piers and the train vehicles are calculated. A field experiment is carried out to verify the results of the analysis, by which the lateral resonant train speed inducing the peak pier-top amplitudes and some other observations are validated.

  16. Life-Cycle Monitoring of Long-Span PSC Box Girder Bridges through Distributed Sensor Network: Strategies, Methods, and Applications

    OpenAIRE

    Chen, Zheheng; Guo, Tong; Yan, Shengyou

    2015-01-01

    Structural health monitoring (SHM) has attracted much attention in recent years, which enables early warnings of structural failure, condition assessments, and rational maintenance/repair strategies. In the context of bridges, many long-span steel bridges in China have been installed with the SHM systems; however, the applications of the SHM in prestressed concrete (PSC) bridges are still rather limited. On the other hand, the PSC box girder bridges are extensively used in highway and railway...

  17. Measurements in a container ship of wave-induced hull girder stresses in excess of design values

    DEFF Research Database (Denmark)

    Andersen, Ingrid Marie Vincent; Jensen, Jørgen Juncher

    2014-01-01

    This paper describes full-scale measurements of the wave-induced vertical bending moment amidships a 9400 TEU container carrier and focuses on the effect of the hydro-elastic high-frequency vibration on the extreme hogging wave bending moment. One extreme event, where the vertical wave-induced ho...... is quite significant. Finally, the hydro-elastic behaviour of the hull girder is assessed by simple approximations using the measured statistical properties and closed-form expressions and the agreement with the actual measurements is found to be good. © 2014 Elsevier Ltd....

  18. Life-Cycle Monitoring of Long-Span PSC Box Girder Bridges through Distributed Sensor Network: Strategies, Methods, and Applications

    Directory of Open Access Journals (Sweden)

    Zheheng Chen

    2015-01-01

    Full Text Available Structural health monitoring (SHM has attracted much attention in recent years, which enables early warnings of structural failure, condition assessments, and rational maintenance/repair strategies. In the context of bridges, many long-span steel bridges in China have been installed with the SHM systems; however, the applications of the SHM in prestressed concrete (PSC bridges are still rather limited. On the other hand, the PSC box girder bridges are extensively used in highway and railway systems and premature damage of these bridges is often reported, resulting in considerable maintenance and/or replacement costs. First, this paper presents a state-of-art review on the SHM of long-span PSC bridges. Monitoring strategies, methods, and previous applications for these bridges are summarized and discussed. In order to well capture the behavior of the bridge during its whole life and to maximize the use of sensors, a life-cycle monitoring strategy is proposed, in which the sensor layout is determined according to requirements for construction monitoring, completion test, and in-service monitoring. A case study is made on a three-span PSC box girder bridge in China. The system configuration, sensor layout, and data communications, and so forth, are presented. The up-to-date monitored structural responses are analyzed and compared with the design values.

  19. The Assessment of the Ultimate Hull Girder Strength of RO-RO Ship after Damages

    Science.gov (United States)

    Zubair Muis Alie, Muhammad; Sitepu, Ganding; Izaak Latumahin, Samuel

    2018-03-01

    Many accidents of Ro-Ro ships happen in Indonesia such as collision and grounding. When the collision or grounding takes place on the Ro-Ro ship, the ultimate strength of hull structure after damage becomes decrease. Car and passenger decks are critical location since collision and/or grounding occur. In the present study, the assessment of the ultimate hull girder strength is conducted. The cross section of Ro-Ro ship is taken to be analyzed. The collision and grounding damages are assumed to be palced on the side and bottom area, respectively. The damages are created by removing the element from the side shell and bottom part. Finally, the result obtained is compared with one another.

  20. Fatigue strength of field welded joints in I-section girders of thick flange plates with cope hole details; Sukarappu wo yusuru atsuita I gata danmen keta genba yosetsu tsugitebu no hiro kyodo

    Energy Technology Data Exchange (ETDEWEB)

    Minami, K.; Miki, C.; Tateishi, K. [Tokyo Institute of Technology, Tokyo (Japan)

    1997-10-15

    Field welding an I-section girder forms details having scallop at the web, whereas the presence of the scallop causes shear deformation and localized stress concentration. Therefore the details in joints with low fatigue strength are ranked as class G in the fatigue design guideline published by JSSC. With special notice on the effect of shear, the present study has varied the phase by using multiple number of jacks; so loaded that the direction of the shear force will change; assumed field welding of a bridge constructed with a few number of main girders; and verified fatigue strength at thick flange plates. In addition, in order to improve the fatigue strength, elucidation was given on the effect of grinder finish at boxing welds. From these results, items to be considered were made clear when structural details are designed and fabricated, in which I-section girders having scallop are welded in fields. Furthermore, it was considered that stress in web plate jointing welding bead becomes relatively higher than local stress in boxing, which was indicated as a point requiring precaution. 8 refs., 20 figs., 2 tabs.

  1. Finite element model updating of multi-span steel-arch-steel-girder bridges based on ambient vibrations

    Science.gov (United States)

    Hou, Tsung-Chin; Gao, Wei-Yuan; Chang, Chia-Sheng; Zhu, Guan-Rong; Su, Yu-Min

    2017-04-01

    The three-span steel-arch-steel-girder Jiaxian Bridge was newly constructed in 2010 to replace the former one that has been destroyed by Typhoon Sinlaku (2008, Taiwan). It was designed and built to continue the domestic service requirement, as well as to improve the tourism business of the Kaohsiung city government, Taiwan. This study aimed at establishing the baseline model of Jiaxian Bridge for hazardous scenario simulation such as typhoons, floods and earthquakes. Necessities of these precaution works were attributed to the inherent vulnerability of the sites: near fault and river cross. The uncalibrated baseline bridge model was built with structural finite element in accordance with the blueprints. Ambient vibration measurements were performed repeatedly to acquire the elastic dynamic characteristics of the bridge structure. Two frequency domain system identification algorithms were employed to extract the measured operational modal parameters. Modal shapes, frequencies, and modal assurance criteria (MAC) were configured as the fitting targets so as to calibrate/update the structural parameters of the baseline model. It has been recognized that different types of structural parameters contribute distinguishably to the fitting targets, as this study has similarly explored. For steel-arch-steel-girder bridges in particular this case, joint rigidity of the steel components was found to be dominant while material properties and section geometries relatively minor. The updated model was capable of providing more rational elastic responses of the bridge superstructure under normal service conditions as well as hazardous scenarios, and can be used for manage the health conditions of the bridge structure.

  2. Prediction of welding shrinkage deformation of bridge steel box girder based on wavelet neural network

    Science.gov (United States)

    Tao, Yulong; Miao, Yunshui; Han, Jiaqi; Yan, Feiyun

    2018-05-01

    Aiming at the low accuracy of traditional forecasting methods such as linear regression method, this paper presents a prediction method for predicting the relationship between bridge steel box girder and its displacement with wavelet neural network. Compared with traditional forecasting methods, this scheme has better local characteristics and learning ability, which greatly improves the prediction ability of deformation. Through analysis of the instance and found that after compared with the traditional prediction method based on wavelet neural network, the rigid beam deformation prediction accuracy is higher, and is superior to the BP neural network prediction results, conform to the actual demand of engineering design.

  3. Erection of the stiffening girder of the Akashi Kaikyo bridge; Akashi Kaikyo Ohashi hokoketa (sono 2) koji no genchi seko

    Energy Technology Data Exchange (ETDEWEB)

    Otsuki, M.; Inoue, M.; Ueno, Y.; Matsumura, T.; Oe, S. [Kawasaki Heavy Industries, Ltd., Kobe (Japan)

    1998-12-20

    The Akashi Kaikyo Bridge is 3,911m long with a center span of 1,991m, making it the longest suspension bridge in the world. Much careful attention has been given to the erection planning details in order to construct the bridge to withstand the harsh environmental conditions of that area. This report details the characteristics of the bridge stiffening girder and erection procedure, and the effects of the Hyogoken-Nanbu Earthquake. (author)

  4. The effects of the pedestal/floor interface on the dynamic characteristics of the storage ring girder support assemblies

    International Nuclear Information System (INIS)

    Jendrzejczyk, J.A.; Chen, S.S.; Zhu, S.; Mangra, D.; Smith, R.K.

    1993-05-01

    To avoid unacceptable vibration of the storage ring quadrupoles, and to ensure that the established vibration criteria are satisfied, the philosophy from inception of the APS has been (1) to locate and design the machine to minimize motion of the storage ring basemat and, (2) following construction, to monitor machine operation and user experiments to ensure that vibration sources are not introduced. This report addresses the design of the storage ring girder support assemblies, and, specifically, the effect of the pedestal/floor interface on the dynamic characteristics (i.e., resonant frequencies, damping, and mode shape)

  5. Analysis of post-tensioned girders structural behaviour using continuous temperature and strain monitoring

    Science.gov (United States)

    Bednarski, Ł.; Sieńko, R.; Howiacki, T.

    2017-10-01

    This article presents the possibility of using structural health monitoring system data for the analysis of structure’s operation during its life cycle. Within the specific case study it was proved, that continuous, automatic and long term monitoring of selected physical quantities such as strains and temperatures, can significantly improve the assessment of technical condition by identifying hazardous phenomena. In this work the analysis of structural behaviour of post-tensioned girders within the roofing of sport halls in Cracow, Poland, was performed based on measurement results and verified by numerical model carried out in SOFiSTiK software. Thanks to the possibility of performing calculations in real time and informing the manager of the object about abnormalities it is possible to manage the structure in effective way by, inter alia, planning the renovations or supporting decisions about snow removal.

  6. Analysis of a damaged and repaired pre-stressed concrete bridge girder by vehicle impact and effectiveness of repair procedure

    OpenAIRE

    Domínguez Mayans, Félix

    2014-01-01

    This thesis aims to study the structural consequences of the damages produced by vehicle impact in a pres-stressed concrete bridge girder and the repair procedure in a real case-study damaged after the bridge was opened to service. From the analysis of the situation of the beam and its damage state, a study of the repair actions carried out on this beam has been analyzed in order to determine the efficiency of the repair and if other alternatives are possible or more efficient. A stat...

  7. Study on the Effect and Mechanism of Aerodynamic Measures for the Vortex-Induced Vibration of Separate Pairs of Box Girders in Cable-Stayed Bridges

    Directory of Open Access Journals (Sweden)

    Han Xin He

    2015-01-01

    Full Text Available Although not always resulting in catastrophic failures, vortex-induced vibration (VIV response can seriously impact the fatigue life and functionality of bridges, especially for separate pairs of box girders in cable-stayed bridges. This study investigates the effects of three aerodynamic measures: grating, inclined web plate, and the baffles on separated box girders in the cable-stayed bridges. The experimental result indicates that the grating of different opening ratios can control the vortex-induced vibration effectively, and the optimized grating opening ratio set in this paper is 40%. Increasing the angle of inclined web plate has a great control on mitigation of the vortex-induced vibration. However, there is an optimum angle where the amplitude of vortex-induced vibration is the smallest at low wind speed. The amplitude of vortex-induced vibration becomes larger with the increase of the web inclined angle that exceeds the optimum angle. Comparatively, the baffles installed on both sides of the inclined webs are more effective to restrain the vortex-induced resonance. The Computational Fluent Dynamics (CFD software is utilized to investigate the mechanism of the experimental results.

  8. Wind tunnel experiments on unstable self-excited vibration of sectional girders

    Science.gov (United States)

    Král, Radomil; Pospíšil, Stanislav; Náprstek, Jiří

    2014-01-01

    In this paper, a wind tunnel analysis of two degrees-of-freedom system represented by sectional girders is carried out. Besides an evaluation of the aeroelastic coefficients, the analysis is focused on the influence of the natural frequency ratio on the initiation of unstable vibration, which can be of practical interest. On the phenomenological level, the paper also discusses experimentally ascertained response regimes, with an emphasis on their stability character. The attention is paid to the memory effect in the response described by the hysteresis loop together with the separation curves determining the stability boundaries. The influence of initial disturbance on the stability is examined. Two types of cross-sections were investigated: (i) rectangular one with the aspect ratio 1:5, and (ii) bridge-like cross-section with comparable principal dimensions. For both types of cross-sections, the limits of the stability are significantly affected by an intentionally introduced initial disturbance. This holds especially with regard to the rectangular profile where the separation curves create very narrow sub-domains between a stable and an unstable response, while the bridge-like cross-section demonstrates much stable behaviour.

  9. Analysis of Temperature and Longitudinal Stress of Very Large Flat Steel Box Girder in Cold Areas%寒冷地区特大扁平钢箱梁温度及纵向应力分析

    Institute of Scientific and Technical Information of China (English)

    胡铁明; 苟红兵; 张冠华; 丁科翔

    2015-01-01

    为指导寒冷地区钢箱梁桥的设计 ,以主跨436 m的钢箱梁斜拉桥——辽河特大桥为研究对象 ,对其扁平钢箱梁进行了为期8个月的温度监测 ,采用对比分析、极值分析、概率统计等方法分析钢箱梁跨中截面温度及纵向应力日变化趋势、总体变化规律及温度对纵向应力的影响情况.结果表明 :环境温度在20~45 ℃时 ,桥梁设计规范计算得到的钢箱梁顶板温度最大值小于实际监测值 ;钢箱梁连续24 h温度变化服从正弦曲线分布 ,纵向应力每天前6 h变化服从线性分布 ,后18 h服从高斯曲线分布 ;24h内温度极值点时的温度效应为其它活荷载总效应的5.7~6.5倍 ;顶板冬季最冷月平均纵向应力相比夏季最热月低12~35 M Pa ,底板冬季最冷月平均纵向应力相比夏季低12~16 M Pa.%To direct the design of steel box girder bridge in cold areas , the Liaohe River Bridge ,a steel box girder cable-stayed bridge with a main span of 436 m ,was taken as the study background ,the flat steel box girder of which experienced temperature monitoring lasting 8 months.A series of analytical methods ,including contrastive analysis ,ultimate value analysis and probabilistic computing were adopted to analyze the trend of daily variation of midspan cross-sec-tion temperature and longitudinal stress of steel box girder as well as the general variation law and the effect of temperature on longitudinal stress.The results of the analysis indicate that the maxi-mum value of the top plate temperature of steel box girder calculated in accordance with the bridge design specification is less than the actual measured value w hen the ambient temperature is around 20~45℃.The 24 h continuous temperature variation of the steel box girder conforms to the sinu-soidal distribution ,the first 6 h variation of longitudinal stress in each day complies with linear dis-tribution and the following 18 h longitudinal stress variation obeys Gaussian

  10. Evaluation of the Structure Stability of a Plate Girder Bridge Using MIDAS Structure Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Eui Soo; Kim, Jong Hyuk [National Forensic Service, Wonju (Korea, Republic of)

    2014-04-15

    Recently, as a means of resolving the issue of legal liability in the event of an accident or a disaster, a wide variety of simulation techniques, such as structural and structure-fluid interaction analysis, have been used in the field of forensic engineering. The plate girder bridge discussed in this paper was being constructed between a pier and an abutment to expand an existing bridge, but an accident whereby the bridge overturned occurred at the end of the concrete laying process for a protective wall. This accident was caused by additional loads not being considered at the time of the design as well as the actual construction being different from the design. The additional loads ultimately generated a negative support force. In this study, we determined the cause of the accident by comparing the structural stability of the original design with that of the additional, non-conforming construction using MIDAS structural analysis.

  11. Evaluation of the Structure Stability of a Plate Girder Bridge Using MIDAS Structure Analysis

    International Nuclear Information System (INIS)

    Kim, Eui Soo; Kim, Jong Hyuk

    2014-01-01

    Recently, as a means of resolving the issue of legal liability in the event of an accident or a disaster, a wide variety of simulation techniques, such as structural and structure-fluid interaction analysis, have been used in the field of forensic engineering. The plate girder bridge discussed in this paper was being constructed between a pier and an abutment to expand an existing bridge, but an accident whereby the bridge overturned occurred at the end of the concrete laying process for a protective wall. This accident was caused by additional loads not being considered at the time of the design as well as the actual construction being different from the design. The additional loads ultimately generated a negative support force. In this study, we determined the cause of the accident by comparing the structural stability of the original design with that of the additional, non-conforming construction using MIDAS structural analysis

  12. A Damage Prognosis Method of Girder Structures Based on Wavelet Neural Networks

    Directory of Open Access Journals (Sweden)

    Rumian Zhong

    2014-01-01

    Full Text Available Based on the basic theory of wavelet neural networks and finite element model updating method, a basic framework of damage prognosis method is proposed in this paper. Firstly, a damaged I-steel beam model testing is used to verify the feasibility and effectiveness of the proposed damage prognosis method. The results show that the predicted results of the damage prognosis method and the measured results are very well consistent, and the maximum error is less than 5%. Furthermore, Xinyihe Bridge in the Beijing-Shanghai Highway is selected as the engineering background, and the damage prognosis is conducted based on the data from the structural health monitoring system. The results show that the traffic volume will increase and seasonal differences will decrease in the next year and a half. The displacement has a slight increase and seasonal characters in the critical section of mid span, but the strain will increase distinctly. The analysis results indicate that the proposed method can be applied to the damage prognosis of girder bridge structures and has the potential for the bridge health monitoring and safety prognosis.

  13. Seismic Retrofit of a Multispan Prestressed Concrete Girder Bridge with Friction Pendulum Devices

    Directory of Open Access Journals (Sweden)

    Alberto Maria Avossa

    2018-01-01

    Full Text Available The paper deals with the proposal and application of a procedure for the seismic retrofit of an existing multispan prestressed concrete girder bridge defined explicitly for the use of friction pendulum devices as an isolation system placed between piers top and deck. First, the outcomes of the seismic risk assessment of the existing bridge, performed using an incremental noniterative Nonlinear Static Procedure, based on the Capacity Spectrum Method as well as the Inelastic Demand Response Spectra, are described and discussed. Then, a specific multilevel design process, based on a proper application of the hierarchy of strength considerations and the Direct Displacement-Based Design approach, is adopted to dimension the FPD devices. Furthermore, to assess the impact of the FPD nonlinear behaviour on the bridge seismic response, a device model that reproduces the variation of the normal force and friction coefficient, the bidirectional coupling, and the large deformation effects during nonlinear dynamic analyses was used. Finally, the paper examines the effects of the FPD modelling parameters on the behaviour of the retrofitted bridge and assesses its seismic response with the results pointing out the efficiency of the adopted seismic retrofit solution.

  14. GPR signal analysis of post-tensioned prestressed concrete girder defects

    Science.gov (United States)

    Liu, Sixin; Weng, Changnian; Jiao, Pengfei; Wang, Fei; Fu, Lei; Meng, Xu; Lei, Linlin

    2013-06-01

    The accurate inspection of the duct condition in post-tensioned prestressed concrete (PPC) is an essential part of GPR concrete inspection. The purpose is to inspect the grouting condition of the ducts where the strands are located, to find out if there is a void in the ducts, and if any water exists. In order to investigate the radar image characteristics of different PPC duct defects, a number of model girders were manufactured. Three major ducts are included in our study: (1) well grouted and no void (normal condition); (2) the duct is half filled, and the void is filled by water or air; and (3) the duct is not filled at all, and the duct is water or air filled. The data corresponding to seven different situations are acquired and processed. It is found that the radar can detect the first interface in the duct, and the detailed structure inside the duct cannot be ‘seen’ from the images directly. Characteristic curves greatly help the interpretation. A completely void duct is the easiest to differentiate from the others. The signature for this situation is characterized by a strong and clear reflection interface which becomes weaker as the void is water filled. The normal condition shows the weakest reflection interface. As for the half void situation, the front scan shows a similar result to the normal condition whether it is water or air filled, and the back scan shows similar features to the completely void situation. The experiment and analysis is helpful and instructive for practical engineering inspection.

  15. Dynamic Responses of Continuous Girder Bridges with Uniform Cross-Section under Moving Vehicular Loads

    Directory of Open Access Journals (Sweden)

    Qingfei Gao

    2015-01-01

    Full Text Available To address the drawback of traditional method of investigating dynamic responses of the continuous girder bridge with uniform cross-section under moving vehicular loads, the orthogonal experimental design method is proposed in this paper. Firstly, some empirical formulas of natural frequencies are obtained by theoretical derivation and numerical simulation. The effects of different parameters on dynamic responses of the vehicle-bridge coupled vibration system are discussed using our own program. Finally, the orthogonal experimental design method is proposed for the dynamic responses analysis. The results show that the effects of factors on dynamic responses are dependent on both the selected position and the type of the responses. In addition, the interaction effects between different factors cannot be ignored. To efficiently reduce experimental runs, the conventional orthogonal design is divided into two phases. It has been proved that the proposed method of the orthogonal experimental design greatly reduces calculation cost, and it is efficient and rational enough to study multifactor problems. Furthermore, it provides a good way to obtain more rational empirical formulas of the DLA and other dynamic responses, which may be adopted in the codes of design and evaluation.

  16. Safety Analysis of the Patch Load Resistance of Plate Girders: Influence of Model Error and Variability

    Directory of Open Access Journals (Sweden)

    Farzad Shahabian

    2013-12-01

    Full Text Available This study aims to undertake a statistical study to evaluate the accuracy of nine models that have been previously proposed for estimating the ultimate resistance of plate girders subjected to patch loading. For each model, mean errors and standard errors, as well as the probability of underestimating or overestimating patch load resistance, are estimated and the resultant values are compared one to another. Prior to that, the models are initially calibrated in order to improve interaction formulae using an experimental data set collected from the literature. The models are then analyzed by computing design factors associated with a target risk level (probability of exceedance. These models are compared one to another considering uncertainties existed in material and geometrical properties. The Monte Carlo simulation method is used to generate random variables. The statistical parameters of the calibrated models are calculated for various coefficients of variations regardless of their correlation with the random resistance variables. These probabilistic results are very useful for evaluating the stochastic sensitivity of the calibrated models.

  17. Wireless ultrasonic wavefield imaging via laser for hidden damage detection inside a steel box girder bridge

    International Nuclear Information System (INIS)

    An, Yun-Kyu; Song, Homin; Sohn, Hoon

    2014-01-01

    This paper presents a wireless ultrasonic wavefield imaging (WUWI) technique for detecting hidden damage inside a steel box girder bridge. The proposed technique allows (1) complete wireless excitation of piezoelectric transducers and noncontact sensing of the corresponding responses using laser beams, (2) autonomous damage visualization without comparing against baseline data previously accumulated from the pristine condition of a target structure and (3) robust damage diagnosis even for real structures with complex structural geometries. First, a new WUWI hardware system was developed by integrating optoelectronic-based signal transmitting and receiving devices and a scanning laser Doppler vibrometer. Next, a damage visualization algorithm, self-referencing f-k filter (SRF), was introduced to isolate and visualize only crack-induced ultrasonic modes from measured ultrasonic wavefield images. Finally, the performance of the proposed technique was validated through hidden crack visualization at a decommissioned Ramp-G Bridge in South Korea. The experimental results reveal that the proposed technique instantaneously detects and successfully visualizes hidden cracks even in the complex structure of a real bridge. (paper)

  18. Residual Strength Analysisof Asymmetrically Damaged Ship Hull GirderUsing Beam Finite Element Method

    Directory of Open Access Journals (Sweden)

    Muhammad Zubair Muis Alie

    2016-04-01

    Full Text Available The objective of the present study is to analyze the residual strength of asymmetrically damaged ship hull girder under longitudinal bending. Beam Finite Element Method isused for the assessment of the residual strength of two single hull bulk carriers (Ship B1 and Ship B4 and a three-cargo-hold model of a single-side Panamax Bulk Carrierin hogging and sagging conditions. The Smith’s  method  is  adopted  and  implemented  into  Beam  Finite  Element Method. An efficient solution procedure is applied; i.e. by assuming the cross section remains plane, the vertical bending moment is applied to the  cross section  and  three-cargo-hold  model. As a fundamental  case,  the  damage is simply  created  by removing the elements from the cross section, neglecting any welding residual stress and initial imperfection. Also no crack  extension  is considered.  The  result  obtained  by  Beam  Finite  Element  Method  so-called Beam-HULLST is compared to the progressive collapse analysis obtained by HULLST for the validation of the present work. Then, for the three-hold-model, the Beam-HULLST is used to investigate the effect of the rotation of the netral axisboth intact and damage condition taking the one and five frame spaces into account. 

  19. CFRP-Strengthening and Long-Term Performance of Fatigue Critical Welds of a Steel Box Girder

    Directory of Open Access Journals (Sweden)

    Roland E. Koller

    2014-02-01

    Full Text Available Empa’s research efforts in the 1990s provided evidence that a considerable increase of the fatigue strength of welded aluminum beams can be achieved by externally bonding pultruded carbon fiber reinforced polymer (CFRP laminates using rubber-toughened epoxies over the fatigue-weak welding zone on their tensile flange. The reinforcing effect obtained is determined by the stiffness of the unidirectional CFRP laminate which has twice the elastic modulus of aluminum. One can therefore easily follow that an unstressed CFRP laminate reinforcement of welded beams made of steel will not lead to a substantial increase in fatigue strength of the steel structure. This consideration led to the idea of prestressing an external reinforcement of the welded zone. The present investigation describes experimental studies to identify the adhesive system suitable for achieving high creep and fatigue strength of the prestressed CFRP patch. Experimental results (Wöhler-fields of shear-lap-specimens and welded steel beams reinforced with prestressed CFRP laminates are presented. The paper concludes by presenting a field application, the reinforcement of a steel pendulum by adhesively bonded prestressed CFRP laminates to the tensile flanges of the welded box girder. Inspections carried out periodically on this structure revealed neither prestress losses nor crack initiation after nine years of service.

  20. Effects of Common Structural Rules on hull-girder reliability of an Aframax oil tanker

    International Nuclear Information System (INIS)

    Parunov, Josko; Guedes Soares, C.

    2008-01-01

    This paper aims at quantifying the changes in notional reliability levels that result from redesigning an existing Aframax tanker to comply with the Common Structural Rules (CSR) for double-hull oil tankers. The probability of structural failure is calculated using the first-order reliability method. The evaluation of the wave-induced load effects that occur during long-term operation of the ship in the seaway is carried out in accordance with the International Association of Classification Societies (IACS)-recommended procedure, while transfer functions are calculated using the sink-source 3D linear method. The still-water loads are defined on the basis of a statistical analysis of loading conditions from the loading manual. The ultimate collapse bending moment of the midship cross section, which is used as the basis for the reliability formulation, is evaluated by progressive collapse analysis and by a single-step procedure according to CSR. The reliability assessment is performed for 'as-built' and 'corroded' states of the existing ship and a reinforced ship complying with CSR. It is shown that the hull-girder failure probability of an Aframax tanker is reduced several times due to the reinforcements according to CSR. Sensitivity analysis and a parametric study are performed to investigate the variability of results with the change of parameters of pertinent random variables within their plausible ranges. Finally, differences between load combination approaches by Ferry-Borges and Castanheta method and Turkstra's rule are investigated

  1. Finite element model updating of a prestressed concrete box girder bridge using subproblem approximation

    Science.gov (United States)

    Chen, G. W.; Omenzetter, P.

    2016-04-01

    This paper presents the implementation of an updating procedure for the finite element model (FEM) of a prestressed concrete continuous box-girder highway off-ramp bridge. Ambient vibration testing was conducted to excite the bridge, assisted by linear chirp sweepings induced by two small electrodynamic shakes deployed to enhance the excitation levels, since the bridge was closed to traffic. The data-driven stochastic subspace identification method was executed to recover the modal properties from measurement data. An initial FEM was developed and correlation between the experimental modal results and their analytical counterparts was studied. Modelling of the pier and abutment bearings was carefully adjusted to reflect the real operational conditions of the bridge. The subproblem approximation method was subsequently utilized to automatically update the FEM. For this purpose, the influences of bearing stiffness, and mass density and Young's modulus of materials were examined as uncertain parameters using sensitivity analysis. The updating objective function was defined based on a summation of squared values of relative errors of natural frequencies between the FEM and experimentation. All the identified modes were used as the target responses with the purpose of putting more constrains for the optimization process and decreasing the number of potentially feasible combinations for parameter changes. The updated FEM of the bridge was able to produce sufficient improvements in natural frequencies in most modes of interest, and can serve for a more precise dynamic response prediction or future investigation of the bridge health.

  2. Wire position system to consistently measure and record the location change of girders following ground changes

    Science.gov (United States)

    Choi, H. J.; Lee, S. B.; Lee, H. G.; Y Back, S.; Kim, S. H.; Kang, H. S.

    2017-07-01

    Several parts that comprise the large scientific device should be installed and operated at the accurate three-dimensional location coordinates (X, Y, and Z) where they should be subjected to survey and alignment. The location of the aligned parts should not be changed in order to ensure that the electron beam parameters (Energy 10 GeV, Charge 200 pC, and Bunch Length 60 fs, Emittance X/Y 0.481 μm/0.256 μm) of PAL-XFEL (X-ray Free Electron Laser of the Pohang Accelerator Laboratory) remain stable and can be operated without any problems. As time goes by, however, the ground goes through uplift and subsidence, which consequently deforms building floors. The deformation of the ground and buildings changes the location of several devices including magnets and RF accelerator tubes, which eventually leads to alignment errors (∆X, ∆Y, and ∆Z). Once alignment errors occur with regard to these parts, the electron beam deviates from its course and beam parameters change accordingly. PAL-XFEL has installed the Hydrostatic Leveling System (HLS) to measure and record the vertical change of buildings and ground consistently and systematically and the Wire Position System (WPS) to measure the two dimensional changes of girders. This paper is designed to introduce the operating principle and design concept of WPS and discuss the current situation regarding installation and operation.

  3. Evaluation of post-tensioning of a curved continuous girder using long-gauge fiber optic sensors

    Science.gov (United States)

    Abdel-Jaber, Hiba; Glisic, Branko

    2014-03-01

    Streicker Bridge is a pedestrian bridge on the Princeton University campus. It consists of a main span and four curved continuous girders (legs). The main span and the southeast leg of the bridge are equipped with fiber optic strain and temperature sensors, allowing the bridge to also function as an on-campus laboratory for the Structural Health Monitoring research group. Parallel sensors were embedded at critical cross-sections in the deck prior to the pouring of concrete. The deck of the southeast leg experienced early age cracking within a few days of concrete pouring, which was detected by the strain sensors. Post-tensioning was then performed and it is assumed that it closed off the cracks. Evaluation of post-tensioning forces is complex due to the existence of the cracks, and this paper researches a procedure to estimate the post-tensioning forces at cracked and uncracked locations. The obtained post-tensioning forces were compared to design forces and conclusions regarding the status of post-tensioning were made. This is important as it gives information on the actual health condition and performance of the structure. It also provides information on the safety of the structure. The objective of this paper is to present a methodology for the evaluation of the post-tensioning force along the deck based on strain measurements. The monitoring system, results, data analysis method, and conclusions regarding the bridge health condition and performance are presented in this paper.

  4. Structural health monitoring of an existing PC box girder bridge with distributed HCFRP sensors in a destructive test

    Science.gov (United States)

    Yang, Caiqian; Wu, Zhishen; Zhang, Yufeng

    2008-06-01

    The application of hybrid carbon fiber reinforced polymer (HCFRP) sensors was addressed to monitor the structural health of an existing prestressed concrete (PC) box girder bridge in a destructive test. The novel HCFRP sensors were fabricated with three types of carbon tows in order to realize distributed and broad-based sensing, which is characterized by long-gauge length and low cost. The HCFRP sensors were bonded on the bottom and side surfaces of the existing bridge to monitor its structural health. The gauge lengths of the sensors bonded on the bottom and side surfaces were 1.5 m and 1.0 m, respectively. The HCFRP sensors were distributed on the bridge for two purposes. One was to detect damage and monitor the structural health of the bridge, such as the initiation and propagation of new cracks, strain distribution and yielding of steel reinforcements. The other purpose was to monitor the propagation of existing cracks. The good relationship between the change in electrical resistance and load indicates that the HCFRP sensors can provide actual infrastructures with a distributed damage detection and structural health monitoring system. Corrections were made to this article on 13 May 2008. The corrected electronic version is identical to the print version.

  5. Structural health monitoring of an existing PC box girder bridge with distributed HCFRP sensors in a destructive test

    International Nuclear Information System (INIS)

    Yang Caiqian; Wu Zhishen; Zhang Yufeng

    2008-01-01

    The application of hybrid carbon fiber reinforced polymer (HCFRP) sensors was addressed to monitor the structural health of an existing prestressed concrete (PC) box girder bridge in a destructive test. The novel HCFRP sensors were fabricated with three types of carbon tows in order to realize distributed and broad-based sensing, which is characterized by long-gauge length and low cost. The HCFRP sensors were bonded on the bottom and side surfaces of the existing bridge to monitor its structural health. The gauge lengths of the sensors bonded on the bottom and side surfaces were 1.5 m and 1.0 m, respectively. The HCFRP sensors were distributed on the bridge for two purposes. One was to detect damage and monitor the structural health of the bridge, such as the initiation and propagation of new cracks, strain distribution and yielding of steel reinforcements. The other purpose was to monitor the propagation of existing cracks. The good relationship between the change in electrical resistance and load indicates that the HCFRP sensors can provide actual infrastructures with a distributed damage detection and structural health monitoring system. Corrections were made to this article on 13 May 2008. The corrected electronic version is identical to the print version

  6. Microstructural characterisation and corrosion performance of old railway girder bridge steel and modern weathering structural steel

    International Nuclear Information System (INIS)

    Tewary, N.K.; Kundu, A.; Nandi, R.; Saha, J.K.; Ghosh, S.K.

    2016-01-01

    Highlights: • Microstructure and corrosion performance are compared for two structural steels. • Microstructure evolution shows primarily ferrite-pearlite in both the steels. • Steels show higher corrosion rate in 1% HCl solution than in 3.5% NaCl solution. • The corrosion products show the presence of oxide, hydroxide and oxy-hydroxides. • The corroded surface reveals morphologies like flowery, cotton balls and rosette. - Abstract: A comparison on microstructure and corrosion performance has been made between the two structural steels used in old railway girder bridge (Sample A) and modern grades of weathering structural steel (Sample B). The microstructures, viewed under optical microscope and scanning electron microscope (SEM), show mainly ferrite-pearlite phase constituents in both the steels, A and B. The phase fraction analysis shows higher amount of pearlite in steel A compared to that of steel B. The grain size of steel A is larger than that of steel B under identical processing condition. The immersion corrosion test in 3.5% NaCl shows that the corrosion rate of steel A increases with time, while the same for steel B decreases with time. On the other hand, corrosion test in 1% HCl shows that the corrosion rate of both steel A and B is higher as compared to that of NaCl which always decreases with time. The XRD analysis of corrosion products show the presence of many oxides, hydroxide and oxy-hydroxide like Lepidocrocite (γ-FeOOH), Goethite (α-FeOOH), Akaganeite (β-FeOOH), Magnetite (Fe_3O_4) and Maghemite (γ-Fe_2O_3) in both the steels. The SEM images of corroded surfaces reveal different morphologies like flowery, cotton balls and rosette etc. which indicate that the corrosion products primarily contain Lepidocrocite (γ-FeOOH), Goethite (α-FeOOH) and Akaganeite (β-FeOOH).

  7. Live-Load Testing Application Using a Wireless Sensor System and Finite-Element Model Analysis of an Integral Abutment Concrete Girder Bridge

    Directory of Open Access Journals (Sweden)

    Robert W. Fausett

    2014-01-01

    Full Text Available As part of an investigation on the performance of integral abutment bridges, a single-span, integral abutment, prestressed concrete girder bridge near Perry, Utah was instrumented for live-load testing. The live-load test included driving trucks at 2.24 m/s (5 mph along predetermined load paths and measuring the corresponding strain and deflection. The measured data was used to validate a finite-element model (FEM of the bridge. The model showed that the integral abutments were behaving as 94% of a fixed-fixed support. Live-load distribution factors were obtained using this validated model and compared to those calculated in accordance to recommended procedures provided in the AASHTO LRFD Bridge Design Specifications (2010. The results indicated that if the bridge was considered simply supported, the AASHTO LRFD Specification distribution factors were conservative (in comparison to the FEM results. These conservative distribution factors, along with the initial simply supported design assumption resulted in a very conservative bridge design. In addition, a parametric study was conducted by modifying various bridge properties of the validated bridge model, one at a time, in order to investigate the influence that individual changes in span length, deck thickness, edge distance, skew, and fixity had on live-load distribution. The results showed that the bridge properties with the largest influence on bridge live-load distribution were fixity, skew, and changes in edge distance.

  8. SEISMIC BEHAVIOR OF STEEL MONORAIL BRIDGES UNDER TRAIN LOAD DURING STRONG EARTHQUAKES

    OpenAIRE

    KIM, C. W.; KAWATANI, M.; KANBARA, T.; NISHIMURA, N.

    2013-01-01

    This paper investigated dynamic responses of steel monorail bridges incorporating train-bridge interaction under strong earthquakes. Two types of steel monorail bridges were considered in the study: a conventional type with steel track-girder; an advanced type with composite track-girder and simplified lateral bracing system. During strong earthquakes, monorail train was assumed standing on the track-girder of monorail bridges. Observations through the analytical study showed that considering...

  9. Design of Control Instrumentation of a 4 meter Variable Polarization Undulator (EPU)

    International Nuclear Information System (INIS)

    Kulesza, Joe; Deyhim, Alex; Fan Taiching; Chen, Jenny

    2007-01-01

    The design of a high end, very sophisticated controller, that consists of an Allen Bradley ControlLogix PLC with a Kinetix servo controller for a 4.16 m EPU is presented. Four servo motors control the gap - 2 on the upper girder and 2 on the lower girder, and another 4 servos controls the phase - 2 on the upper girder inner and outer and 2 on the lower girder, inner and outer. This system is designed for The Taiwan Light Source (TLS) a synchrotron radiation machine of the National Synchrotron Radiation Research Center (NSRRC) at the energy of 1.5 GeV with electron beam current of 200 ∼ 400 mA

  10. Longest cable-stayed bridge TATARA; Longest shachokyo Tatara Ohashi

    Energy Technology Data Exchange (ETDEWEB)

    Fujii, K. [Hiroshima University, Hiroshima (Japan). Faculty of Engineering

    1998-06-15

    The world`s longest cable-stayed bridge Tatara having a central span of 890 m had the both ends closed in August 1997, linking Namakuchi Island and Omishima Island. Final finishing work is continuing for opening of the West Seto Expressway in the spring of 1999. A cable-stayed bridge supports the bridge girders by perpendicular components of tensile force of cables stayed obliquely. On the other hand, there is a concern that the girders may have axial compression force generated due to horizontal components of the force from the cable tensile force, which can cause buckling of the girders. Therefore, in order to suspend the girders efficiently by increasing the perpendicular components of the cable force, and moreover to suppress the axial compression force on the girders, it is more advantageous to make bridge towers high, hence the towers of this bridge are highest among the bridges on the Shimanami Ocean Road. This bridge whose long girders are stayed with 21-stage multi cables presented a problem in designing the buckling in steel girders near the towers due to the horizontal components of the force generated by the bridge. Discussions were given, therefore, by using load withstanding force experiments using a whole bridge model of 1/50 scale, buckling experiments on full-size reinforcing plate models, and load withstanding force analysis using a tower model. A number of other technical discussions were repeated, by which the world`s longest cable-stayed bridge was completed. 9 figs., 1 tab.

  11. FMIT alignment cart

    International Nuclear Information System (INIS)

    Potter, R.C.; Dauelsberg, L.B.; Clark, D.C.; Grieggs, R.J.

    1981-01-01

    The Fusion Materials Irradiation Test (FMIT) Facility alignment cart must perform several functions. It must serve as a fixture to receive the drift-tube girder assembly when it is removed from the linac tank. It must transport the girder assembly from the linac vault to the area where alignment or disassembly is to take place. It must serve as a disassembly fixture to hold the girder while individual drift tubes are removed for repair. It must align the drift tube bores in a straight line parallel to the girder, using an optical system. These functions must be performed without violating any clearances found within the building. The bore tubes of the drift tubes will be irradiated, and shielding will be included in the system for easier maintenance

  12. Study of the supporting system for the CLIC Two-Beam Module

    CERN Document Server

    Gazis, Nick; Mainaud-Durand, Hélène; Gudkov, Dmitry; Samoshkin, Alexandre; Simopoulos, Simos; Hinis, Evangelos; Alexopoulos, Theodoros

    2010-01-01

    The Compact Linear Collider (CLIC) study aims at the development of a Multi-TeV e+ e-collider. The micro-precision CLIC structures will have an accelerating gradient of 100 MV/m and will be aligned on so-called girders. The girder construction constrains are mainly dictated by the beam physics and RF requirements. The study of such girders is a challenging case involving material choice, mechanical design as well as prototype fabrication and experimental testing.

  13. Analysis of structural diseases in widened structure due to the shrinkage and creep difference of new bridge

    Science.gov (United States)

    Wu, Wenqing; Zhang, Hui

    2018-03-01

    In order to investigate the possible structural diseases brought to the top flange of existing prestressed concrete box girder bridge due to the shrinkage and creep difference between new and old bridge, the stress state of the existing box girder before and after widening and the mechanisms of potential structural diseases were analyzed using finite element method in this paper. Results showed that the inner flange of the old box girder were generally in the state of large tensile stress, the main reason for which was the shrinkage and creep effect difference of the new and old bridge. And the tensile stress was larger than tensile strength of C50 concrete, which would most likely cause crack in the deck plate of box girder. Hence, reinforcement measures are needed to be designed carefully. Meanwhile, the transverse deformation of widened structure had exceeded the distance between the anti-seismic block and the web of box girder at the end cross section, which would squeeze anti-seismic block severely. Therefore, it is necessary to limit the length of continuous bridge in need of widening.

  14. Geometric nonlinear analysis of self-anchored cable-stayed suspension bridges.

    Science.gov (United States)

    Hui-Li, Wang; Yan-Bin, Tan; Si-Feng, Qin; Zhe, Zhang

    2013-01-01

    Geometric nonlinearity of self-anchored cable-stayed suspension bridges is studied in this paper. The repercussion of shrinkage and creep of concrete, rise-to-span ratio, and girder camber on the system is discussed. A self-anchored cable-stayed suspension bridge with a main span of 800 m is analyzed with linear theory, second-order theory, and nonlinear theory, respectively. In the condition of various rise-to-span ratios and girder cambers, the moments and displacements of both the girder and the pylon under live load are acquired. Based on the results it is derived that the second-order theory can be adopted to analyze a self-anchored cable-stayed suspension bridge with a main span of 800 m, and the error is less than 6%. The shrinkage and creep of concrete impose a conspicuous impact on the structure. And it outmatches suspension bridges for system stiffness. As the rise-to-span ratio increases, the axial forces of the main cable and the girder decline. The system stiffness rises with the girder camber being employed.

  15. Assessment of Replacement Bridge using Proof Load Test

    Science.gov (United States)

    Sundru, Saibabu

    2017-11-01

    This work begins with an overview of the condition assessment of old bridge and explained reasons for demolishing of the bridge. Briefly presented flexural analysis of two stage post-tensioned prestressed concrete girder, which will be replace the old (new bridge). Construction of I-girder and composite girder at first stage and second stage prestressing respectively is explained with figures. Assessment of the load-caring capacity of the one span of the replacement bridge with simple supports using proof load test is presented which is mandatory according to Indian standards. Weighted sand bags were used to load the bridge up to a predetermined service load with impact factor. Deflections of the I-girders of the bridge were measured at selected locations along and across the bridge span and compared with computed values. Linear response was observed during loading and unloading. Considering the load test results, theoretical estimation and criteria as stipulated in codes of practice, it can be inferred that prestressed concrete I-girder bridge span has adequate capacity to carry the loads and hence, deemed to have passed the test.

  16. Geometric Nonlinear Analysis of Self-Anchored Cable-Stayed Suspension Bridges

    Directory of Open Access Journals (Sweden)

    Wang Hui-Li

    2013-01-01

    Full Text Available Geometric nonlinearity of self-anchored cable-stayed suspension bridges is studied in this paper. The repercussion of shrinkage and creep of concrete, rise-to-span ratio, and girder camber on the system is discussed. A self-anchored cable-stayed suspension bridge with a main span of 800 m is analyzed with linear theory, second-order theory, and nonlinear theory, respectively. In the condition of various rise-to-span ratios and girder cambers, the moments and displacements of both the girder and the pylon under live load are acquired. Based on the results it is derived that the second-order theory can be adopted to analyze a self-anchored cable-stayed suspension bridge with a main span of 800 m, and the error is less than 6%. The shrinkage and creep of concrete impose a conspicuous impact on the structure. And it outmatches suspension bridges for system stiffness. As the rise-to-span ratio increases, the axial forces of the main cable and the girder decline. The system stiffness rises with the girder camber being employed.

  17. せん断力の反転を考慮した鋼 I 桁ウェブガセット溶接部の応力性状と疲労強度評価

    OpenAIRE

    松井, 喜昭

    2016-01-01

    The stress variation and fatigue strength of out-of-plane gusset welded joint on a steel I-section girder web has been examined when a load runs over the girder. Theses examinations are essential in order to establish the fatigue strength evaluation method in the stress field where the direction of principal stress changes. For this purpose, stress measurement tests and fatigue tests on the steel I-section girder specimen with out-of-plane gusset welded joints under the moving load, and finit...

  18. Fatigue strength of the joint between diaphragms and longitudinal ribs in box section girders; Hako danmen keta no diaphragm to shita flange tateribu no kosabu no hiro kyodo

    Energy Technology Data Exchange (ETDEWEB)

    Miki, C.; Shiozaki, M.; Takeishi, K. [Tokyo Institute of Technology, Tokyo (Japan). Faculty of Engineering; Ohashi, H. [Honshu-Shikoku Bridge Authority, Tokyo (Japan)

    1997-04-21

    Discussions were given on crossing joints of diaphragms on hanger fixing sections and U-ribs on lower flanges in reinforcing box girders of a suspension bridge, as to their local stress generating behavior and effects of cope holes on fatigue strength. The test pieces have dimensions and shapes modeling the crossing joints, and the steel materials are SM490YA for upper and lower flanges and webs, and SS400 for U-ribs. The loading test was performed with four-point bending and at loading amplitudes of 30 to 45 tf. Furthermore, stress analysis was conducted by using the finite element method. The following conclusions were obtained as a result: local stress at cope hole tips decreases and fatigue strength increases with the smaller the cope hole diameter; when the cope holes are back-filled completely, deformation is concentrated on welds of the U-ribs and the flanges, generating high local stress; this reduces significantly the fatigue strength of details having no cope holes; and no particular differences are found on effects of boxing of the cope hole tips on the fatigue strength. 7 refs., 10 figs., 3 tabs.

  19. Determination of brace forces caused by construction loads and wind loads during bridge construction : [summary].

    Science.gov (United States)

    2014-04-01

    Bridges are constructed in stages as pilings, : columns, girders, decks, and other components : are added. At each stage, the structure must be : stable. Girders, which add significant weight to : the developing structure, rest on elastomeric : beari...

  20. Christian Menn's recent bridge designs - Reducing structural elements to the simplest solution

    OpenAIRE

    Brühwiler, E.; Mahmoud, Khaled M.

    2009-01-01

    The conceptual designs by Christian Menn of four landmark bridges are presented: 1) a 350-m span cable-stayed bridge with jointless deck girder, 2) a cable-stayed bridge with a single “spindle-shaped” pylon, 3) a bridge with an arch reaching high above the deck (both carrying a horizontally curved deck girder), and 4) a cable stayed bridge with three pylons monolithically connected to the deck girder. All of the original bridge designs are driven by the aim to optimize the flow of force...

  1. stress distribution in continuo ribution in continuous thin ribution

    African Journals Online (AJOL)

    eobe

    studied stresses in thin-walled box girder bridges but stress distribution walled box girder bridges .... the classical thin plate theory and trigonometric series. Lertsima et al. ..... remedied by applying spline finite strip method. Compared to other ...

  2. Stress Analysis for the Critical Metal Structure of Bridge Crane

    Science.gov (United States)

    Ling, Zhangwei; Wang, Min; Xia, Junfang; Wang, Songhua; Guo, Xiaolian

    2018-01-01

    Based on the type of connection between the main girder and end beam of electrical single beam crane, the finite element analysis model of a full portal crane was established. The stress distribution of the critical structure under different loading conditions was analyzed. The results shown that the maximum Mises stress and deflection of the main girder were within the allowable range. And the connecting location between end beam web and main girder had higher stress than other region, especially at the lower edge and upper edge of the end beam web and the area near the bolt hole of upper wing panel. Therefore it is important to inspect the connection status, the stress condition and the crack situation nearing connection location during the regular inspection process to ensure the safety of the connection between the main girder and end beam.

  3. Active Control of Suspension Bridges

    DEFF Research Database (Denmark)

    Thoft-Christensen, Palle

    In this paper some recent research on active control of very long suspension bridges, is presented. The presentation is based on research work at Aalborg University, Denmark. The active control system is based on movable flaps attached to the bridge girder. Wind load on bridges with or without...... flaps attached to the girder is briefly presented. A simple active control system is discussed. Results from wind tunnel experiments with a bridge section show that flaps can be used effectively to control bridge girder vibrations. Flutter conditions for suspension bridges with and without flaps...

  4. Drift tube suspension for high intensity linear accelerators

    International Nuclear Information System (INIS)

    Clark, D.C.; Frank, J.A.; Liska, D.J.; Potter, R.C.; Schamaun, R.G.

    1982-01-01

    The disclosure relates to a drift tube suspension for high intensity linear accelerators. The system comprises a series of box-sections girders independently adjustably mounted on a linear accelerator. A plurality of drift tube holding stems are individually adjustably mounted on each girder

  5. Low Cost Wireless Fatigue Crack Monitoring System Using RFID Arrays

    Science.gov (United States)

    2018-03-23

    The use of welded steel cover plates had been a common design practice to increase beam section capacity in regions ofhigh torsion for decades. Many steel girder bridges with cover plates are still in service. Steel girder bridges are subject to cycl...

  6. Drift tube suspension for high intensity linear accelerators

    Science.gov (United States)

    Liska, Donald J.; Schamaun, Roger G.; Clark, Donald C.; Potter, R. Christopher; Frank, Joseph A.

    1982-01-01

    The disclosure relates to a drift tube suspension for high intensity linear accelerators. The system comprises a series of box-sections girders independently adjustably mounted on a linear accelerator. A plurality of drift tube holding stems are individually adjustably mounted on each girder.

  7. 78 FR 52232 - 2013 Temporary Closure of I-65 (I-70/I-65 South Split Interchange) in the City of Indianapolis

    Science.gov (United States)

    2013-08-22

    ... southbound bridge girders and lowering the pavement section from south of Morris Street to north of Fletcher... immediately. FOR FURTHER INFORMATION CONTACT: Ms. Crystal Jones, Office of Freight Management and Operations..., which consists of replacing the northbound and southbound bridge girders and lowering the pavement...

  8. Assessment of vehicular live load and load factors for design of short-span bridges according to the new Egyptian Code

    Directory of Open Access Journals (Sweden)

    Hatem M. Seliem

    2015-04-01

    The study shows that concrete box-girders designed according to ECP-201:2012 and ECP-201:2003 using the ultimate limit state method yield almost the same demand. Despite the increase in the VLL of ECP-201:2012, and consequently the live load forces, concrete I-shaped girder bridges will be subjected to less total factored internal forces in comparison to ECP-201:2003 This is attributed to the interaction between the live to dead loads ratio and the load combinations. Design of composite steel plate girder bridges according to ECP-201:2012 using the allowable stress design method yields over designed sections.

  9. Intelligente Bauwerke

    DEFF Research Database (Denmark)

    Schneider, Ronald; Fischer, Johannes; Straub, Daniel

    girder is formed. This approach accounts for structural redundancies of the continuous box girder with respect to its plastic cross-sectional capacity and its static indeterminacy. To prove the concept, a software prototype has been developed which couples an easy-to-use graphical user interface (front-end......) with a computational engine (back-end). The current version of the prototype implements a model of chloride-induced reinforcement corrosion and a structural model which performs the plastic limit analysis for determining the ultimate capacity of the box girder on the basis of a finite element model. The prototype...

  10. Effects of CFRP Strengthening on Dynamic and Fatigue Responses of Composite Bridge

    Directory of Open Access Journals (Sweden)

    Kittisak Kuntiyawichai

    2014-01-01

    Full Text Available This paper investigates the effect of CFRP strengthening on dynamic and fatigue responses of composite bridge using finite element program ABAQUS. Dynamic and fatigue responses of composite bridge due to truck load based on AASHTO standard are investigated. Two types of CFRP strengthening techniques, CFRP sheets and CFRP deck, are applied to both the damaged and undamaged bridges. For the case of damaged bridge, two through-thickness crack sizes, 3 mm and 6 mm in depth, are assumed at midspan of the steel girders. Furthermore, effects of the number of steel girders on the dynamic and fatigue responses are also considered. The results show that the maximum responses of composite bridges occur for dual lane cases. By using CFRP as a strengthening material, the maximum stress and deflection of the steel girders reduce and consequently increase the fatigue life of the girders. After introducing initial crack into the steel girders of the composite bridges, the fatigue life of the bridges is dramatically reduced. However, the overall performance of the damaged composite bridge can be improved by using CFRP, albeit with less effectiveness. Therefore, if cracks are found, steel welding must be performed before strengthening the composite bridge by CFRP.

  11. Comparative analysis among deterministic and stochastic collision damage models for oil tanker and bulk carrier reliability

    Directory of Open Access Journals (Sweden)

    A. Campanile

    2018-01-01

    Full Text Available The incidence of collision damage models on oil tanker and bulk carrier reliability is investigated considering the IACS deterministic model against GOALDS/IMO database statistics for collision events, substantiating the probabilistic model. Statistical properties of hull girder residual strength are determined by Monte Carlo simulation, based on random generation of damage dimensions and a modified form of incremental-iterative method, to account for neutral axis rotation and equilibrium of horizontal bending moment, due to cross-section asymmetry after collision events. Reliability analysis is performed, to investigate the incidence of collision penetration depth and height statistical properties on hull girder sagging/hogging failure probabilities. Besides, the incidence of corrosion on hull girder residual strength and reliability is also discussed, focussing on gross, hull girder net and local net scantlings, respectively. The ISSC double hull oil tanker and single side bulk carrier, assumed as test cases in the ISSC 2012 report, are taken as reference ships.

  12. Reactor building for a nuclear reactor

    International Nuclear Information System (INIS)

    Haidlen, F.

    1976-01-01

    The invention concerns the improvement of the design of a liner, supported by a latticed steel girder structure and destined for guaranteeing a gastight closure for the plant compartments in the reactor building of a pressurized water reactor. It is intended to provide the steel girder structure on their top side with grates, being suited for walking upon, and to hang on their lower side diaphragms in modular construction as a liner. At the edges they may be sealed with bellows in order to avoid thermal stresses. The steel girder structure may at the same time serve as supports for parts of the steam pipe. (RW) [de

  13. Parametric Study on Responses of a Self-Anchored Suspension Bridge to Sudden Breakage of a Hanger

    Directory of Open Access Journals (Sweden)

    Wenliang Qiu

    2014-01-01

    Full Text Available The girder of self-anchored suspension bridge is subjected to large compression force applied by main cables. So, serious damage of the girder due to breakage of hangers may cause the collapse of the whole bridge. With the time increasing, the hangers may break suddenly for their resistance capacities decrease due to corrosion. Using nonlinear static and dynamic analysis methods and adopting 3D finite element model, the responses of an actual self-anchored suspension bridge to sudden breakage of hangers are studied in this paper. The results show that the sudden breakage of a hanger causes violent vibration and large changes in internal forces of the bridge. In the process of the vibration, the maximum tension of hanger produced by breakage of a hanger exceeds 2.22 times its initial value, and the reaction forces of the bearings increase by more than 1.86 times the tension of the broken hanger. Based on the actual bridge, the influences of some factors including flexural stiffness of girder, torsion stiffness of girder, flexural stiffness of main cable, weight of girder, weight of main cable, span to sag ratio of main cable, distance of hangers, span length, and breakage time of hanger on the dynamic responses are studied in detail, and the influencing extent of the factors is presented.

  14. Parametric study on responses of a self-anchored suspension bridge to sudden breakage of a hanger.

    Science.gov (United States)

    Qiu, Wenliang; Jiang, Meng; Huang, Cailiang

    2014-01-01

    The girder of self-anchored suspension bridge is subjected to large compression force applied by main cables. So, serious damage of the girder due to breakage of hangers may cause the collapse of the whole bridge. With the time increasing, the hangers may break suddenly for their resistance capacities decrease due to corrosion. Using nonlinear static and dynamic analysis methods and adopting 3D finite element model, the responses of an actual self-anchored suspension bridge to sudden breakage of hangers are studied in this paper. The results show that the sudden breakage of a hanger causes violent vibration and large changes in internal forces of the bridge. In the process of the vibration, the maximum tension of hanger produced by breakage of a hanger exceeds 2.22 times its initial value, and the reaction forces of the bearings increase by more than 1.86 times the tension of the broken hanger. Based on the actual bridge, the influences of some factors including flexural stiffness of girder, torsion stiffness of girder, flexural stiffness of main cable, weight of girder, weight of main cable, span to sag ratio of main cable, distance of hangers, span length, and breakage time of hanger on the dynamic responses are studied in detail, and the influencing extent of the factors is presented.

  15. Kajian Analitik Perencanaan Pintu Air Pembangkit Listrik Tenaga Air

    OpenAIRE

    Pradoto, Pradoto

    1993-01-01

    Pada pintu air pembangkit listrik tenaga air umumnya dipasang pengauat-penguat (girder). Tujuannya agar pintu air kuat dalam menahan tekanan air. Tekanan air yang diderita oleh pintu air cukup besar karena dipasang pada kedalaman + 50 meter di bawah permukaan air. Permasalahan yang timbul adalah menentukan posisi atau letak girder pada pintu air.

  16. Container crane for sea freight containers

    NARCIS (Netherlands)

    Luttekes, E.; Rijsenbrij, J.C.

    2001-01-01

    The invention relates to a container crane for loading and unloading seaborne containers. The container crane comprises a bridge girder (7), a jib (8), at least two crabs (11, 12) which can travel along the said bridge girder and/or jib and are provided with hoist means for lifting and lowering the

  17. Vertical dynamics of the Maglev vehicle Transrapid

    International Nuclear Information System (INIS)

    Haegele, Nora; Dignath, Florian

    2009-01-01

    The Maglev vehicle Transrapid is levitated by magnetic forces which pull the vehicles levitation frames toward the guideway from below. The magnets possess poles with alternating fluxes which are part of the synchronous long stator linear motor. Although the Transrapid glides along its guideway without mechanical contact, this alternation as well as the loading and unloading of the guideway girders excite vibrations of the ground. In order to calculate the time behavior of the vibrational emissions, a simulation of the transfer of a Transrapid vehicle over several guideway girders is proposed. The equations of motion for the vehicle and the girders are calculated separately by the MBS software NEWEUL and assembled and numerically integrated in MATLAB/SIMULINK. The control law for the magnet forces is simplified by the characteristics of linear spring-damper elements. The controlled magnet forces travel along the guideway continuously and include the dynamic component due to the alternating fluxes and the geometry of the poles and stator. Results of a complete vehicle moving along a guideway consisting of several girders can be obtained within a few minutes of computation time. Therefore, the mechanism of excitations can be analyzed by numerical time integration in the full state space. The results are validated by measurements of the forces in the joints of the guideway girders. The vibrational emission along the Transrapid guideway differs from the vibrations of contact-afflicted vehicles as no impacts and fewer stochastic effects occur

  18. Vertical dynamics of the Maglev vehicle Transrapid

    Energy Technology Data Exchange (ETDEWEB)

    Haegele, Nora [University of Stuttgart, Institute of Engineering and Computational Mechanics (Germany)], E-mail: Nora.Haegele@gmx.de; Dignath, Florian [ThyssenKrupp Transrapid, Basic Technologies (Germany)], E-mail: Florian.Dignath@ThyssenKrupp.com

    2009-04-15

    The Maglev vehicle Transrapid is levitated by magnetic forces which pull the vehicles levitation frames toward the guideway from below. The magnets possess poles with alternating fluxes which are part of the synchronous long stator linear motor. Although the Transrapid glides along its guideway without mechanical contact, this alternation as well as the loading and unloading of the guideway girders excite vibrations of the ground. In order to calculate the time behavior of the vibrational emissions, a simulation of the transfer of a Transrapid vehicle over several guideway girders is proposed. The equations of motion for the vehicle and the girders are calculated separately by the MBS software NEWEUL and assembled and numerically integrated in MATLAB/SIMULINK. The control law for the magnet forces is simplified by the characteristics of linear spring-damper elements. The controlled magnet forces travel along the guideway continuously and include the dynamic component due to the alternating fluxes and the geometry of the poles and stator. Results of a complete vehicle moving along a guideway consisting of several girders can be obtained within a few minutes of computation time. Therefore, the mechanism of excitations can be analyzed by numerical time integration in the full state space. The results are validated by measurements of the forces in the joints of the guideway girders. The vibrational emission along the Transrapid guideway differs from the vibrations of contact-afflicted vehicles as no impacts and fewer stochastic effects occur.

  19. Ultimate strength of a large wind turbine blade

    DEFF Research Database (Denmark)

    Jensen, Find Mølholt

    2009-01-01

    reinforcements helping to prevent undesired structural elastic mechanisms are presented. The functionality of two of the suggested structural reinforcements was demonstrated in full-scale tests and the rest trough FE-studies. The blade design under investigation consisted of an aerodynamic airfoil and a load...... carrying box girder. In total, five full-scale tests have been performed involving one complete blade and two shortened box girders. The second box girder was submitted to three independent tests covering different structural reinforcement alternatives. The advantages and disadvantages of testing......The present PhD project contains a study of the structural static strength of wind turbine blades loaded in flap-wise direction. A combination of experimental and numerical work has been used to address the most critical failure mechanisms and to get an understanding of the complex structural...

  20. High performance electronics for alignment regulation on the CLIC 30GHz modules

    International Nuclear Information System (INIS)

    Carrica, D.; Coosemans, W.; Pittin, R.

    1999-01-01

    CERN is studying a linear collider (CLIC) to obtain electron-positron collisions with centre-of-mass energies in the TeV range. To demonstrate the feasibility of CLIC, a test facility (CTF2) is being constructed. CTF2 consists of 4 identical modules, each 1.4 m long module consists of 2 linac with a girder and a doublet or a triplet quadrupole. Girders are elements that support mechanically the cavities of the accelerator while the main objective of the quadrupole is to focus particle beams. The alignment system has 2 principal utilities. The first is to pre-align the elements to make the beam pass through the aperture and produce signals in beam position monitors. In respect to these signals the girders and the quadrupoles are moved for making the definitive alignment. The second utility is to maintain the elements in this position. The alignment control system of CTF2 must regulate the position of the girders and quadrupoles with a precision < 10 μm. In fact an accuracy of 1 μ has been obtained on CTF2. Thanks to its flexibility and its simplicity, the system is expected to adapt easily to CLIC even if it means to control modules that involve up to a maximum of 384 motors and 896 sensors

  1. Effect of lateral deformations of guideway on guidance characteristics of maglev train

    International Nuclear Information System (INIS)

    Kim, Ki Jung; Yang, Seok Jo; Lee, Jae Kyoung; Han, Hyung Suk

    2015-01-01

    A slender guideway is essential in improving aesthetically and reducing its construction cost which accounts for about 70% of overall investment for maglev system. As the slender guideway, however, may increase its deformation, its effect on levitation stability and guidance performance needs to be analyzed. The purpose of this study is to analyze the effect on guidance characteristics of maglev due to the lateral deformation of the guideway girder and lateral irregularity of guiderail. For doing this, 3D model considering lateral deformation of girder and irregularity of rail of the guideway is developed. Using the dynamic interaction model integrated with the proposed guideway and maglev vehicle including electromagnetics and its controller, guidance characteristics of maglev are analyzed. It is analyzed that the effect on lateral deformation of girder is relatively small compared to deformation on the lateral irregularities of guiderail

  2. A new hydrostatic leveling system developed for the Advanced Photon Source

    International Nuclear Information System (INIS)

    Kivioja, L. A.

    1998-01-01

    As a result of the calibration tests performed with the first prototype units using the new measurement principle, we believe that the described leveling method is stable and accurate to the micron level with a sufficiently large range for the expected elevation changes of the support girders used in the Advanced Photon Source (APS) storage ring. Although long-term studies with this system have not been conducted, we believe that after installation this system requires little or no servicing for long periods of time. The methods described in this paper cover only the elevation changes of individual vessels. However, changes in the tilt of a girder must also be known. Therefore, a combination of tiltmeters in conjunction with this hydrostatic level system (HLS) would be most suitable for measuring the tilt and elevation changes of the APS girders

  3. Effect of lateral deformations of guideway on guidance characteristics of maglev train

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Ki Jung; Yang, Seok Jo [Dept. of Mechatronics Engineering, Chungnam National Unversity, Daejeon (Korea, Republic of); Lee, Jae Kyoung; Han, Hyung Suk [Korea Institute of Machery and Materials, Daejeon (Korea, Republic of)

    2015-11-15

    A slender guideway is essential in improving aesthetically and reducing its construction cost which accounts for about 70% of overall investment for maglev system. As the slender guideway, however, may increase its deformation, its effect on levitation stability and guidance performance needs to be analyzed. The purpose of this study is to analyze the effect on guidance characteristics of maglev due to the lateral deformation of the guideway girder and lateral irregularity of guiderail. For doing this, 3D model considering lateral deformation of girder and irregularity of rail of the guideway is developed. Using the dynamic interaction model integrated with the proposed guideway and maglev vehicle including electromagnetics and its controller, guidance characteristics of maglev are analyzed. It is analyzed that the effect on lateral deformation of girder is relatively small compared to deformation on the lateral irregularities of guiderail.

  4. Verification of LRFD Bridge Design and Analysis Software for INDOT

    OpenAIRE

    Varma, Amit H.; Seo, Jungil

    2009-01-01

    NCHRP Process 12-50 was implemented to evaluate and verify composite steel I-girder bridge design software used commonly in Indiana. A test-bed of twenty one bridges was developed with the guidance from an Indiana Department of Transportation appointed research advisory panel (RAP). The test-bed included five simple-span and sixteen multi-span bridge superstructures. More than 80 parameters were required to define a bridge and they include bridge span, girder spacing, number of beams, section...

  5. Application of Classical Land Surveying Measurement Methods for Determining the Vertical Displacement of Railway Bridges

    Science.gov (United States)

    Gawronek, Pelagia; Makuch, Maria

    2017-12-01

    The classical measurements of stability of railway bridge, in the context of determining the vertical displacements of the object, consisted on precise leveling of girders and trigonometric leveling of controlled points (fixed into girders' surface). The construction elements, which were measured in two ways, in real terms belonged to the same vertical planes. Altitude measurements of construction were carried out during periodic structural stability tests and during static load tests of bridge by train. The specificity of displacement measurements, the type of measured object and the rail land surveying measurement conditions were determinants to define methodology of altitude measurement. The article presents compatibility of vertical displacements of steel railway bridge, which were developed in two measurement methods. In conclusion, the authors proposed the optimum concept of determining the vertical displacements of girders by using precise and trigonometric leveling (in terms of accuracy, safety and economy of measurement).

  6. Application of Classical Land Surveying Measurement Methods for Determining the Vertical Displacement of Railway Bridges

    Directory of Open Access Journals (Sweden)

    Gawronek Pelagia

    2017-12-01

    Full Text Available The classical measurements of stability of railway bridge, in the context of determining the vertical displacements of the object, consisted on precise leveling of girders and trigonometric leveling of controlled points (fixed into girders' surface. The construction elements, which were measured in two ways, in real terms belonged to the same vertical planes. Altitude measurements of construction were carried out during periodic structural stability tests and during static load tests of bridge by train. The specificity of displacement measurements, the type of measured object and the rail land surveying measurement conditions were determinants to define methodology of altitude measurement. The article presents compatibility of vertical displacements of steel railway bridge, which were developed in two measurement methods. In conclusion, the authors proposed the optimum concept of determining the vertical displacements of girders by using precise and trigonometric leveling (in terms of accuracy, safety and economy of measurement.

  7. A case study of interior low-frequency noise from box-shaped bridge girders induced by running trains: Its mechanism, prediction and countermeasures

    Science.gov (United States)

    Zhang, Xun; Li, Xiaozhen; Hao, Hong; Wang, Dangxiong; Li, Yadong

    2016-04-01

    A side effect of high-speed railway and urban rail transit systems is the associated vibration and noise. Since the use of concrete viaducts is predominant in railway construction due to scarce land resources, low-frequency (20-200 Hz) structure-radiated noise from concrete bridges is a principal concern. Although it is the most commonly used bridge type, the mechanism of noise emission from box-shaped bridge girders when subjected to impact forces from moving trains, which sounds like beating a drum, has not been well studied. In this study, a field measurement was first made on a simply-supported box-shaped bridge to record the acceleration of the slabs and the associated sound pressures induced by running trains. These data indicated that a significant beat-wave noise occurred in the box-shaped cavity when the train speed was around 340 km/h, which arose from the interference between two sound waves of 75.0 Hz and 78.8 Hz. The noise leakage from the bridge expansion joint was serious and resulted in obvious noise pollution near the bridge once the beat-wave noise was generated in the cavity. The dominant frequency of the interior noise at 75.0 Hz was confirmed from the spectrum of the data and the modal analysis results, and originated from the peak vibration of the top slab due to resonance and the first-order vertical acoustic mode, which led to cavity resonance, amplifying the corresponding noise. The three-dimensional acoustic modes and local vibration modes of the slab were calculated by using the finite element method. A simplified vehicle-track-bridge coupling vibration model was then developed to calculate the wheel-rail interaction force in a frequency range of 20-200 Hz. Numerical simulations using the boundary element method confirmed the cavity resonance effect and the numerical results agreed well with the data. Based on the calibrated numerical model, three noise reduction measures, i.e., adding a horizontal baffle in the interior cavity, narrowing

  8. Long-Term Effects of Super Heavy-Weight Vehicles on Bridges

    OpenAIRE

    Wood, Scott M.; Akinci, Necip Onder; Liu, Judy; Bowman, Mark D

    2007-01-01

    A permit truck which exceeds the predefined limit of 108 kips is defined as a superload in Indiana. This study was conducted to examine the long-term effects of superload trucks on the performance of typical slab-on-girder bridges and to assess the likelihood of causing immediate damage. Typical steel and prestressed concrete slab-on-girder type bridges were analyzed using both beam line analysis and detailed finite element models. Furthermore, one prestressed concrete bridge and one steel br...

  9. Investigating the impact of non-linear geometrical effects on wind turbine blades—Part 1: Current status of design and test methods and future challenges in design optimization

    DEFF Research Database (Denmark)

    Jensen, Find Mølholt; Puri, Amit S.; Dear, John P.

    2011-01-01

    This article is the first part of a three-article series and it deals with full-scale tests of a load-carrying box girder. The two other articles present more details on smaller sub-component levels as well as cap specimens (article 2) and shear webs (article 3). This article also links to the two...... may also have a significant impact on present wind turbine blades. In this article, a 34 m long load-carrying box girder has been tested in static flap-wise bending, and it has been demonstrated that, for this design, the Brazier effect is a critical phenomenon of great relevance for the ultimate...... failure strength. The box girder has been evaluated with and without a cap (wire) reinforcement. The cap reinforcement is one out of seven inventions Risø DTU published in 2008, which are all intended to result in a lighter and more reliable blade design. Copyright © 2010 John Wiley & Sons, Ltd....

  10. Impact of measurement uncertainty from experimental load distribution factors on bridge load rating

    Science.gov (United States)

    Gangone, Michael V.; Whelan, Matthew J.

    2018-03-01

    Load rating and testing of highway bridges is important in determining the capacity of the structure. Experimental load rating utilizes strain transducers placed at critical locations of the superstructure to measure normal strains. These strains are then used in computing diagnostic performance measures (neutral axis of bending, load distribution factor) and ultimately a load rating. However, it has been shown that experimentally obtained strain measurements contain uncertainties associated with the accuracy and precision of the sensor and sensing system. These uncertainties propagate through to the diagnostic indicators that in turn transmit into the load rating calculation. This paper will analyze the effect that measurement uncertainties have on the experimental load rating results of a 3 span multi-girder/stringer steel and concrete bridge. The focus of this paper will be limited to the uncertainty associated with the experimental distribution factor estimate. For the testing discussed, strain readings were gathered at the midspan of each span of both exterior girders and the center girder. Test vehicles of known weight were positioned at specified locations on each span to generate maximum strain response for each of the five girders. The strain uncertainties were used in conjunction with a propagation formula developed by the authors to determine the standard uncertainty in the distribution factor estimates. This distribution factor uncertainty is then introduced into the load rating computation to determine the possible range of the load rating. The results show the importance of understanding measurement uncertainty in experimental load testing.

  11. Experimental assessment of an RFID-based crack sensor for steel structures

    Science.gov (United States)

    E Martínez-Castro, R.; Jang, S.; Nicholas, J.; Bansal, R.

    2017-08-01

    The use of welded steel cover plates had been a common design practice to increase beam section capacity in regions of high moment for decades. Many steel girder bridges with cover plates are still in service. Steel girder bridges are subject to cyclic loading, which can initiate crack formation at the toe of the weld and reduce beam capacity. Thus, timely detection of fatigue cracks is of utmost importance in steel girder bridge monitoring. To date, crack monitoring methods using in-house radio frequency identification (RFID)-based sensors have been developed to complement visual inspection and provide quantitative information of damage level. Offering similar properties at a reduced cost, commercial ultra-high frequency (UHF) passive RFID tags have been identified as a more financially viable option for pervasive crack monitoring using a dense array of sensors. This paper presents a study on damage sensitivity of low-cost commercial UHF RFID tags for crack detection and monitoring on metallic structures. Using backscatter power as a parameter for damage identification, a crack sensing system has been developed for single and multiple tag configurations for increased sensing pervasiveness. The effect on backscatter power of the existence and stage of crack propagation has been successfully characterized. For further automation of crack detection, a damage index based on the variation of backscatter power has also been established. The tested commercial RFID-based crack sensor contributes to the usage of this technology on steel girder bridges.

  12. Investigation of aerodynamic stability by wind response observation during cantilever construction of the Ikara Ohashi bridge; Ikara Ohashi haridashi sekoji no kaze kansoku ni yoru taifu anteisei no kento

    Energy Technology Data Exchange (ETDEWEB)

    Ueno, K.; Mukai, H.; Takeda, T. [Kajima Corp., Tokyo (Japan)

    1995-12-20

    In order to ensure aerodynamic stability during cantilever construction of the Ikara Ohashi Bridge, wind response observation was carried out and discussions were given on the result. The Ikara Ohashi Bridge is a 5-span continuous PC cable-stayed bridge with the central span being a concrete bridge having a length of 260 m, which is the longest in Japan. The bridge was constructed using a method that main girders are extended from the central tower to the right and left sides while the girders are stayed by bracing cables. The bridge construction site is in an area which is often subjected to typhoons and gusts like seasonal winds in winter, hence a discussion on aerodynamic stability of the bridge especially during extension work was viewed as an important matter. In addition, the construction used two small-capacity cables spaced and bundled as the bracing material, which required verification on their aerodynamic stability. In order to identify vibration characteristics of the main girders and the central tower, wind response observation has been performed as soon as the construction was begun. As a result, the vibration characteristics of the main girders and the central tower were identified, and it was verified that vibration shape and dominant frequency can be evaluated properly by an intrinsic value analysis that uses a multi-material point frame model. Furthermore, effects of different vibration absorbing measures were compared, and the effective methods were adopted as the result. 4 refs., 12 figs.

  13. Prestressing Concrete with CFRP Composites for Sustainability and Corrosion-Free Applications

    Directory of Open Access Journals (Sweden)

    Belarbi A.

    2018-01-01

    Full Text Available Advancement in material science has enabled the engineers to enhance the strength and long-term behavior of concrete structures. The conventional approach is to use steel for prestressed bridge girders. Despite having good ductility and strength, beams prestressed with steel are susceptible to corrosion when subjected to environmental exposure. The corrosion of the prestressing steel reduces load carrying capacity of the prestressed member and result in catastrophic failures. In the last decades, more durable composite materials such as Aramid Fiber Reinforced Polymer (AFRP, Glass Fiber Reinforced Polymer (GFRP and Carbon Fiber Reinforced Polymer (CFRP have been implemented in concrete structures as a solution to this problem. Among these materials, CFRP stands out as a primary prestressing reinforcement, which has the potential to replace steel and provide corrosion free prestressed bridge girders. Despite its promise, prestressing CFRP has not frequently been used for bridge construction worldwide. The major contributing factor to the lack of advancement of this promising technology in the United States (U.S. is the lack of comprehensive design specifications. Apart from a limited number of guides, manuals, and commentaries, there is currently no standard or comprehensive design guideline available to bridge engineers in the U.S. for the design of concrete structures prestressed with CFRP systems. The main goal is to develop design guidelines in AASHTO-LRFD format for concrete bridge girders with prestressing CFRP materials. The guidelines are intended to address the limitation in current AASHTO-LRFD Bridge Design Specifications which is applicable for prestressed bridge girders with steel strands. To accomplish this goal, some of the critical parameters that affect the design and long-term behavior of prestressed concrete bridge girders with prestressing CFRP systems are identified and included in the research work. This paper presents

  14. Nuevo puente para el oleoducto de Europa Central

    Directory of Open Access Journals (Sweden)

    Giuliani, G.

    1971-04-01

    Full Text Available This bridge runs over the Po river, near Pavia, and is 1,370 m long. It is divided into spans of 36 m length each. The horizontal structure of the bridge consists of sets of four continuous girders, running over six spans, and two continuous girders, extending over seven spans. The piles are 14 m high and 1.50 m in diameter, and rest on the extension of the foundation piles. This article describes details of the project and the system of placing the continuous girders.Este puente, construido sobre el río Po, cerca de Pavía, tiene una longitud total de 1.370 m, dividida en tramos de 36 m de longitud, salvados por cuatro vigas continuas, de 6 vanos, y dos vigas continuas, de 7 vanos. Las pilas, de 14 m de altura y 1,50 m de diámetro, se han construido sobre la prolongación de los pilotes de cimientos. El artículo explica las particularidades de la obra y el procedimiento de lanzamiento adoptado.

  15. Bridges analysis, design, structural health monitoring, and rehabilitation

    CERN Document Server

    Bakht, Baidar

    2015-01-01

    This book offers a valuable guide for practicing bridge engineers and graduate students in structural engineering; its main purpose is to present the latest concepts in bridge engineering in fairly easy-to-follow terms. The book provides details of easy-to-use computer programs for: ·      Analysing slab-on-girder bridges for live load distribution. ·      Analysing slab and other solid bridge components for live load distribution. ·      Analysing and designing concrete deck slab overhangs of girder bridges under vehicular loads. ·      Determining the failure loads of concrete deck slabs of girder bridges under concentrated wheel loads. In addition, the book includes extensive chapters dealing with the design of wood bridges and soil-steel bridges. Further, a unique chapter on structural health monitoring (SHM) will help bridge engineers determine the actual load carrying capacities of bridges, as opposed to their perceived analytical capacities. The chapter addressing structures...

  16. An overheight vehicle bridge collision monitoring system using piezoelectric transducers

    Science.gov (United States)

    Song, G.; Olmi, C.; Gu, H.

    2007-04-01

    With increasing traffic volume follows an increase in the number of overheight truck collisions with highway bridges. The detection of collision impact and evaluation of the impact level is a critical issue in the maintenance of a concrete bridge. In this paper, an overheight collision detection and evaluation system is developed for concrete bridge girders using piezoelectric transducers. An electric circuit is designed to detect the impact and to activate a digital camera to take photos of the offending truck. Impact tests and a health monitoring test were conducted on a model concrete bridge girder by using three piezoelectric transducers embedded before casting. From the experimental data of the impact test, it can be seen that there is a linear relation between the output of sensor energy and the impact energy. The health monitoring results show that the proposed damage index indicates the level of damage inside the model concrete bridge girder. The proposed overheight truck-bridge collision detection and evaluation system has the potential to be applied to the safety monitoring of highway bridges.

  17. Fabrication and erection of 'Chuo ohashi bridge' for Tokyo Metropolitan Government. Tokyoto kensetsukyoku 'Chuo ohashi' no seisaku oyobi kasetsu

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    The present report outlines the superstructure of 'Chuo Ohashi Bridge' spanning the Sumida River, Tokyo Metropolis. Being 210.7m in length and 25.0m in breadth, that bridge is a cable-stayed bridge partially curved with a 220m radius curvature. Having a height of 76.8m, its main tower is shaped into an upside-down V with a curved top. Description of the points of which care was specially taken for the fabrication and construction in yard covers the cable anchorage of both girders and tower, assembly and welding, anti-shrinkage camber of girders, weld bevel preparation for the tower, tentative assembly, and accuracy control. Results of the wind tunnel test with a (1/50) scale model are as follows: stay cables were installed as measures against the vibration during the main tower erection. The main girders, main tower and cables were the order of superstructural erection. The cable tensioning was supervised mainly with its proper tension adjustment and subsidiarily for the configuration of bridge built. 2 refs., 10 figs., 1 tab.

  18. Gust loading on streamlined bridge decks

    DEFF Research Database (Denmark)

    Larose, Guy; Mann, Jakob

    1998-01-01

    The current analytical description of the buffeting action of wind on long-span bridges is based on the strip assumption. However, recent experiments on closed-box girder bridge decks have shown that this assumption is not valid and is the source of an important part of the error margin...... of the analytical prediction methods. In this paper, an analytical model that departs from the strip assumption is used to describe the gust loading on a thin airfoil. A parallel is drawn between the analytical model and direct measurements of gust loading on motionless closed-box girder bridge decks. Empirical...

  19. MODELLING STUDIES ON THE USE OF ALUMINIUM ALLOYS IN LIGHTWEIGHT LOAD-CARRYING CRANE STRUCTURES

    Directory of Open Access Journals (Sweden)

    Damian GĄSKA

    2016-09-01

    Full Text Available The article presents the results of numerical analysis whose aim was to compare the basic dynamic and strength parameters of lightweight load-carrying crane structures made of aluminium alloys and steel. The analysis covered the typical construction of workshop cranes with a span of 3 to 5 meters, girders in the form of an I-beam and maximum load capacities amounting to 5 tons. The values of stresses, deflections and natural frequencies were compared and then matched with the masses of the various structures. In the simulation a girder model was used and computed by the finite element method.

  20. Monitoring system of arch bridge for safety network management

    Science.gov (United States)

    Joo, Bong Chul; Yoo, Young Jun; Lee, Chin Hyung; Park, Ki Tae; Hwang, Yoon Koog

    2010-03-01

    Korea has constructed the safety management network monitoring test systems for the civil infrastructure since 2006 which includes airport structure, irrigation structure, railroad structure, road structure, and underground structure. Bridges among the road structure include the various superstructure types which are Steel box girder bridge, suspension bridge, PSC-box-girder bridge, and arch bridge. This paper shows the process of constructing the real-time monitoring system for the arch bridge and the measured result by the system. The arch type among various superstructure types has not only the structural efficiency but the visual beauty, because the arch type superstructure makes full use of the feature of curve. The main measuring points of arch bridges composited by curved members make a difference to compare with the system of girder bridges composited by straight members. This paper also shows the method to construct the monitoring system that considers the characteristic of the arch bridge. The system now includes strain gauges and thermometers, and it will include various sensor types such as CCTV, accelerometers and so on additionally. For the long term and accuracy monitoring, the latest optical sensors and equipments are applied to the system.

  1. Specification and R and D Program on Magnet Alignment Tolerances for NSLS-II

    International Nuclear Information System (INIS)

    Kramer, S.L.; Jain, A.K.

    2009-01-01

    The NSLS-II light source is a proposed 3 GeV storage ring, with the potential for ultra-low emittance. Despite the reduced emittance goal for the bare lattice, the closed orbit amplification factors are on average >55 in both planes, for random quadrupole alignment errors. The high chromaticity will also require strong sextupoles and the low 3 GeV energy will require large dynamic and momentum aperture to insure adequate lifetime. This will require tight alignment tolerances (∼ 30(micro)m) on the multipole magnets during installation. By specifying tight alignment tolerances of the magnets on the support girders, the random alignment tolerances of the girders in the tunnel can be significantly relaxed. Using beam based alignment to find the golden orbit through the quadrupole centers, the closed orbit offsets in the multipole magnets will then be reduced to essentially the alignment errors of the magnets, restoring much of the dynamic aperture and lifetime of the bare lattice. Our R and D program to achieve these tight alignment tolerances of the magnets on the girders using a vibrating wire technique, will be discussed and initial results presented.

  2. Yonjung High-Speed Railway Bridge Assessment Using Output-Only Structural Health Monitoring Measurements under Train Speed Changing

    Directory of Open Access Journals (Sweden)

    Mosbeh R. Kaloop

    2016-01-01

    Full Text Available Yonjung Bridge is a hybrid multispan bridge that is designed to transport high-speed trains (HEMU-430X with maximum operating speed of 430 km/h. The bridge consists of simply supported prestressed concrete (PSC and composite steel girders to carry double railway tracks. The structural health monitoring system (SHM is designed and installed to investigate and assess the performance of the bridge in terms of acceleration and deformation measurements under different speeds of the passing train. The SHM measurements are investigated in both time and frequency domains; in addition, several identification models are examined to assess the performance of the bridge. The drawn conclusions show that the maximum deflection and acceleration of the bridge are within the design limits that are specified by the Korean and European codes. The parameters evaluation of the model identification depicts the quasistatic and dynamic deformations of PSC and steel girders to be different and less correlated when higher speeds of the passing trains are considered. Finally, the variation of the frequency content of the dynamic deformations of the girders is negligible when high speeds are considered.

  3. Design and construction of Chichibu-park bridge. Chichibu Koenkyo (kasho) no sekkei to seko

    Energy Technology Data Exchange (ETDEWEB)

    Hasuike, H.; Azami, Y. (Saitama Prefectural Government Office, Saitama (Japan) New Structural Engineering, Ltd., Tokyo (Japan)); Yamamoto, T.

    1994-01-31

    The design and construction of the Chichibu-Park Bridge in Japan were outlined which is the symmetric 2-span continuous PC cable stayed road bridge with one main tower (530 m in total length, 392 m in main bridge length, 19 m in width) built over the Arakawa River. The double-suspended four-box main girder with wind noses was adopted because of its excellent torsional rigidity of area and wind proof stability, and the rigid-frame main girder was rigidly connected to the middle main tower. The main tower with an H-type hollow section was adopted considering its workability, and was assembled with its divided 18 blocks. Each side of the main girder was suspended at 30 points spaced at 6.0 m, and the tower ends of the diagonal cables were fixed to the partition inside the main tower taking a landscape into account. The thick stranded wires composed of fine PC steel stranded wires and covered with polyethylene were adopted as diagonal cables, and structural beams were used for both ends of the diagonal cables. Damping wires were also adopted to damp the diagonal cables. 9 refs., 12 figs., 6 tabs.

  4. An influence of technological contraflexure of crane bridges on its durability

    Directory of Open Access Journals (Sweden)

    Artur BLUM

    2010-01-01

    Full Text Available Standard requirements till 1996 year during bridge crane manufacturing demanded a positive technological contraflexure. As a result of this process were implemented technological compressive stress into tensile zone from inertial and operational loads and tensile stress into compressive zone. This way there were redistributed resultant stress which have increased fatigue strength of exploited crane bridges. Actually valid standard PN-ISO 7363 has removed this obligatory requirement. Its use depends of crane buyer demands. Reduction of initial positive deflection can be seen after few years of crane operations. It is a case of girders permanent deflections increment. Article presents method of technological prestressing of bridge girders with its practical application to obtain positive contrafexure.

  5. Finite Element Analysis of Doorframe Structure of Single Oblique Pole Type in Container Crane

    Science.gov (United States)

    Cheng, X. F.; Wu, F. Q.; Tang, G.; Hu, X.

    2017-07-01

    Compared with the composite type, the single oblique pole type has more advantages, such as simple structure, thrift steel and high safe overhead clearance. The finite element model of the single oblique pole type is established in nodes by ANSYS, and more details are considered when the model is simplified, such as the section of Girder and Boom, torque in Girder and Boom occurred by Machinery house and Trolley, density according to the way of simplification etc. The stress and deformation of ten observation points are compared and analyzed, when the trolley is in nine dangerous positions. Based on the result of analysis, six dangerous points are selected to provide reference for the detection and evaluation of container crane.

  6. Positron acceleration to 200 MeV

    International Nuclear Information System (INIS)

    Leboutet, H.

    1983-01-01

    220 MeV is the energy that has to be obtained in routine operation. A standard 12m girder with SLED II can give 220 MeV minus a few percent due to not riding at the crest of the wave. In order to have the 200 MeV with only one girder, a klystron at full power all the time would be required - kept brand new. Then, for safety it is necessary to use two klystrons as designated in the SLC design. Having two klystrons gives freedom for the choice of the best arrangement. Since there will be excess rf power, it can be traded against higher gradient, shorter waveguides, larger apertures (lower shunt impedence)

  7. Application of Composite Structures in Bridge Engineering. Problems of Construction Process and Strength Analysis

    Science.gov (United States)

    Flaga, Kazimierz; Furtak, Kazimierz

    2015-03-01

    Steel-concrete composite structures have been used in bridge engineering from decades. This is due to rational utilisation of the strength properties of the two materials. At the same time, the reinforced concrete (or prestressed) deck slab is more favourable than the orthotropic steel plate used in steel bridges (higher mass, better vibration damping, longer life). The most commonly found in practice are composite girder bridges, particularly in highway bridges of small and medium spans, but the spans may reach over 200 m. In larger spans steel truss girders are applied. Bridge composite structures are also employed in cable-stayed bridge decks of the main girder spans of the order of 600, 800 m. The aim of the article is to present the cionstruction process and strength analysis problems concerning of this type of structures. Much attention is paid to the design and calculation of the shear connectors characteristic for the discussed objects. The authors focused mainly on the issues of single composite structures. The effect of assembly states on the stresses and strains in composite members are highlighted. A separate part of problems is devoted to the influence of rheological factors, i.e. concrete shrinkage and creep, as well as thermal factors on the stresses and strains and redistribution of internal forces.

  8. Molecular Retrofitting Adapts a Metal–Organic Framework to Extreme Pressure

    International Nuclear Information System (INIS)

    Kapustin, Eugene A.; Lee, Seungkyu

    2017-01-01

    Despite numerous studies on chemical and thermal stability of metal-organic frameworks (MOFs), mechanical stability remains largely undeveloped. No strategy exists to control the mechanical deformation of MOFs under ultrahigh pressure, to date. We show that the mechanically unstable MOF-520 can be retrofitted by precise placement of a rigid 4,4'-biphenyldicarboxylate (BPDC) linker as a "girder" to afford a mechanically robust framework: MOF-520-BPDC. This retrofitting alters how the structure deforms under ultrahigh pressure and thus leads to a drastic enhancement of its mechanical robustness. While in the parent MOF-520 the pressure transmitting medium molecules diffuse into the pore and expand the structure from the inside upon compression, the girder in the new retrofitted MOF-520-BPDC prevents the framework from expansion by linking two adjacent secondary building units together. As a result, the modified MOF is stable under hydrostatic compression in a diamond-anvil cell up to 5.5 gigapascal. The increased mechanical stability of MOF-520-BPDC prohibits the typical amorphization observed for MOFs in this pressure range. Direct correlation between the orientation of these girders within the framework and its linear strain was estimated, providing new insights for the design of MOFs with optimized mechanical properties.

  9. Research on Energy-Saving Design of Overhead Travelling Crane Camber Based on Probability Load Distribution

    Directory of Open Access Journals (Sweden)

    Tong Yifei

    2014-01-01

    Full Text Available Crane is a mechanical device, used widely to move materials in modern production. It is reported that the energy consumptions of China are at least 5–8 times of other developing countries. Thus, energy consumption becomes an unavoidable topic. There are several reasons influencing the energy loss, and the camber of the girder is the one not to be neglected. In this paper, the problem of the deflections induced by the moving payload in the girder of overhead travelling crane is examined. The evaluation of a camber giving a counterdeflection of the girder is proposed in order to get minimum energy consumptions for trolley to move along a nonstraight support. To this aim, probabilistic payload distributions are considered instead of fixed or rated loads involved in other researches. Taking 50/10 t bridge crane as a research object, the probability loads are determined by analysis of load distribution density functions. According to load distribution, camber design under different probability loads is discussed in detail as well as energy consumptions distribution. The research results provide the design reference of reasonable camber to obtain the least energy consumption for climbing corresponding to different P0; thus energy-saving design can be achieved.

  10. Ultimate strength of a large wind turbine blade

    Energy Technology Data Exchange (ETDEWEB)

    Moelholt Jensen, Find

    2008-05-15

    The present PhD project contains a study of the structural static strength of wind turbine blades loaded in flap-wise direction. A combination of experimental and numerical work has been used to address the most critical failure mechanisms and to get an understanding of the complex structural behaviour of wind turbine blades. Four failure mechanisms observed during the fullscale tests and the corresponding FE-analysis are presented. Elastic mechanisms associated with failure, such as buckling, localized bending and the Brazier effect, are studied. Six different types of structural reinforcements helping to prevent undesired structural elastic mechanisms are presented. The functionality of two of the suggested structural reinforcements was demonstrated in full-scale tests and the rest trough FE-studies. The blade design under investigation consisted of an aerodynamic airfoil and a load carrying box girder. In total, five full-scale tests have been performed involving one complete blade and two shortened box girders. The second box girder was submitted to three independent tests covering different structural reinforcement alternatives. The advantages and disadvantages of testing a shortened load carrying box girder vs. an entire blade are discussed. Changes in the boundary conditions, loads and additional reinforcements, which were introduced in the box girder tests in order to avoid undesired structural elastic mechanisms, are presented. New and advanced measuring equipment was used in the fullscale tests to detect the critical failure mechanisms and to get an understanding of the complex structural behaviour. Traditionally, displacement sensors and strain gauges in blade tests are arranged based on an assumption of a Bernoulli-Euler beam structural response. In the present study it is shown that when following this procedure important information about distortions of the cross sections is lost. In the tests presented here, one of the aims was to measure distortion

  11. Flexible concrete link slabs used as expansion joints in bridge decks

    DEFF Research Database (Denmark)

    Lárusson, Lárus Helgi; Fischer, Gregor

    2011-01-01

    of water through the expansion joint and subsequent corrosion of girders and girder bearings. Investigations on joint-less superstructures using conventional steel reinforcement in so-called concrete link slabs indicate improved performance and economic feasibility. However, this concept requires...... relatively large amounts of steel reinforcement for crack control purposes and consequently provides a relatively large flexural stiffness and negative moment capacity at the joint between the spans. These contradicting requirements and effects in existing replacement concepts for damaged mechanical bridge...... joints are currently unresolved. In the proposed system described in this paper, a ductile cement-based composite section reinforced with Glass Fiber Reinforced Polymers (GFRP) replaces the damaged expansion joint. The combination of this ductile concrete together with corrosion resistant GFRP...

  12. Extreme value prediction of the wave-induced vertical bending moment in large container ships

    DEFF Research Database (Denmark)

    Andersen, Ingrid Marie Vincent; Jensen, Jørgen Juncher

    2015-01-01

    increase the extreme hull girder response significantly. Focus in the present paper is on the influence of the hull girder flexibility on the extreme response amidships, namely the wave-induced vertical bending moment (VBM) in hogging, and the prediction of the extreme value of the same. The analysis...... in the present paper is based on time series of full scale measurements from three large container ships of 8600, 9400 and 14000 TEU. When carrying out the extreme value estimation the peak-over-threshold (POT) method combined with an appropriate extreme value distribution is applied. The choice of a proper...... threshold level as well as the statistical correlation between clustered peaks influence the extreme value prediction and are taken into consideration in the present paper....

  13. TM 2: Assembly prototype girder

    Energy Technology Data Exchange (ETDEWEB)

    Brooks, S. [Brookhaven National Lab. (BNL), Upton, NY (United States); Peggs, S. [Brookhaven National Lab. (BNL), Upton, NY (United States); Trbojevic, D. [Brookhaven National Lab. (BNL), Upton, NY (United States); Tuozzolo, J. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2017-04-30

    This Technical Note presents details of the successful achievement of Technical Milestone 2 in the NYSERDA contract with Brookhaven National Laboratory and Cornell University. The project { to design, build and commission the Cornell-BNL Electron Test Accelerator (CBETA) { will achieve final success when all 12 Technical Milestones are complete.

  14. Performance evaluation of corrosion-affected reinforced concrete ...

    Indian Academy of Sciences (India)

    M B Anoop

    Abstract. A methodology for performance evaluation of reinforced concrete bridge girders in corrosive ... concrete (RC) members of infrastructural systems, espe- ... bility will be useful for making engineering decisions for ...... Water-cement ratio.

  15. Predicting camber, deflection, and prestress losses in prestressed concrete members.

    Science.gov (United States)

    2011-07-01

    Accurate predictions of camber and prestress losses for prestressed concrete bridge girders are essential to minimizing the frequency and cost of construction problems. The time-dependent nature of prestress losses, variable concrete properties, and ...

  16. Appendix G : end region design models.

    Science.gov (United States)

    2013-03-01

    The 2007 AASHTO LRFD Bridge Design Specifications contain prescriptive : requirements for the quantity and placement of confinement reinforcement located in the bottom : flange of pretensioned concrete I-girders. This chapter proposes a rational mode...

  17. Fundamental limits on beam stability at the Advanced Photon Source

    International Nuclear Information System (INIS)

    Decker, G. A.

    1998-01-01

    Orbit correction is now routinely performed at the few-micron level in the Advanced Photon Source (APS) storage ring. Three diagnostics are presently in use to measure and control both AC and DC orbit motions: broad-band turn-by-turn rf beam position monitors (BPMs), narrow-band switched heterodyne receivers, and photoemission-style x-ray beam position monitors. Each type of diagnostic has its own set of systematic error effects that place limits on the ultimate pointing stability of x-ray beams supplied to users at the APS. Limiting sources of beam motion at present are magnet power supply noise, girder vibration, and thermal timescale vacuum chamber and girder motion. This paper will investigate the present limitations on orbit correction, and will delve into the upgrades necessary to achieve true sub-micron beam stability

  18. Instrumented module of the ATLAS tile calorimeter

    CERN Multimedia

    Laurent Guiraud

    1998-01-01

    The ATLAS tile calorimeter consists of steel absorber plates interspersed with plastic scintillator tiles. Interactions of high-energy hadrons in the plates transform the incident energy into a 'hadronic shower'. When shower particles traverse the scintillating tiles, the latter emit an amount of light proportional to the incident energy. This light is transmitted along readout fibres to a photomultiplier, where a detectable electrical signal is produced. These pictures show one of 64 modules or 'wedges' of the barrel part of the tile calorimeter, which are arranged to form a cylinder around the beam axis. The wedge has been instrumented with scintillators and readout fibres. Photos 03, 06: Checking the routing of the readout fibres into the girder that houses the photomultipliers. Photo 04: A view of the fibre bundles inside the girder.

  19. Puentes extradosados: evolución y tendencias actuales

    Directory of Open Access Journals (Sweden)

    José Miguel Benjumea Royero

    2012-09-01

    Full Text Available Since their appearance in 1994, extradosed bridges have played an important role in road and railway projects, competing (in medium span lengths with cables-stayed and prestressed box girder bridges. At a regional level, extradosed bridges have been implemented more frequently in Asia, but recent projects developed in Europe and America show a growing interest in this typology. Consequently, this paper is aimed at offering a survey viewpoint on the evolution of extradosed bridges, from their origin to their current applications. This paper is also intended to show the adopted structural trends by presenting existing extradosed bridges, bridges under construction, and newly designed bridges. Finally, the main advantages and disadvantages of this type of bridges are analyzed and compared to cable-stayed and prestressed box girder bridges.

  20. Structural Impact of Construction Loads

    Science.gov (United States)

    2012-08-01

    Numerous bridge construction accidents have occurred across the country because of construction loadings, which are an underemphasized : topic in many DOT specifications and design manuals. Bridge girders are least stable when they are subjected to c...

  1. Precast concrete elements for accelerated bridge construction : laboratory testing, field testing, evaluation of a precast concrete bridge, Madison County bridge.

    Science.gov (United States)

    2009-01-01

    The importance of rapid construction technologies has been recognized by the Federal Highway Administration (FHWA) and the Iowa : DOT Office of Bridges and Structures. Recognizing this a two-lane single-span precast box girder bridge was constructed ...

  2. Calculation for Hull Strength Construction in Offshore Structures

    African Journals Online (AJOL)

    PROF. O. E. OSUAGWU

    2013-09-01

    Sep 1, 2013 ... of hull plating, reinforcing stiffeners, girders, and other structures. This paper therefore used the .... From these equations we derive that. Safety of. Factor. Stress ..... machineries, systems etc. of the ships or barge under design.

  3. Construction of Daiichi Tamagawa bridge; Daiichi Tamagawa kyoryo no seko

    Energy Technology Data Exchange (ETDEWEB)

    Watanabe, O.; Tsuyoshi, T. [East Japan Railway Company, Tokyo (Japan); Ota, T.; Sato, S. [Tekken Corp., Tokyo (Japan)

    1997-05-30

    This paper describes the construction of Daiichi Tamagawa Bridge for JR Tazawako Line, which was reconstructed with the Akita Shinkansen Project apart from the existing line. This bridge is a three-span continuous PC cable stayed bridge. To avoid operation accidents due to snow and ice, independent two-column type with a height of 11 m without beam was employed for the main tower. For the construction of upper part, overhang election construction method was adopted, which can be applied all the year round. The main girder has a single box cross section, and a width of 5.5 m and a beam height of 2.3 m. This was also constructed by the overhang construction method. To reduce the construction period, the main tower was constructed by the precast block construction method. The whole bridge was divided into six blocks by considering the hoist performance of cranes. Reinforcement against bearing pressure and cleavage due to the cable tensile force was conducted by adopting saddle structure for the main tower. Oblique members were jointed with the main girder using lateral beams projected from lateral side of girder. Totally seven PC cables were used for each oblique member. Measurements and management during the overhang construction were also described. The construction was over without problems in August, 1996. This bridge is under test operation using test run vehicles. 2 refs., 20 figs., 7 tabs.

  4. Static behaviors of long-span cable-stayed bridge; Chodai shachokyo no seiteki kyodo ni kansuru kosatsu

    Energy Technology Data Exchange (ETDEWEB)

    Xie, Xu [Saitama Univ., Saitama (Japan). Graduate School; Yamaguchi, H.; Ito, M. [Saitama Univ., Urawa (Japan). Faculty of Engineering

    1996-04-21

    In this study, incremental equation of cable-stayed bridge is formulated by finite element method taking the geometrical nonlinear analysis into account. Then, as an example of designing a bridge with 1500m span, setting up the initial tension, analysis of in-plane behavior caused by live loads as well as analysis of the behavior against wind caused by out-of-plane wind load that are necessary for designing a bridge with 1500m span are carried out. The main results obtained through the study are as follows. As for the cable stayed bridge with 1500m center super long-span having supplementary supporting points between the side arms, the geometrical non-linearity caused by the in-plane design live loads is not remarkable. The effects of wind which acts on girders on analysis of the behaviors against wind are different depending on the aerodynamic performance of the girder and in the case of high wind speed, strong effects on the behavior against wind of the in-plane and screws generate. As the changing of tension of the cable makes influences on the force of in-plane cross section and on displacement of the girder, if the wind speed is very high, the analysis results of the behaviors against wind of in-plane and screws of the cable-stayed bridge may be different depending on in what manner the wind load on the cable to be treated. 16 refs., 16 figs., 1 tab.

  5. Steel framing strategies for highly skewed bridges to reduce/eliminate distortion near skewed supports.

    Science.gov (United States)

    2014-05-01

    Different problems in straight skewed steel I-girder bridges are often associated with the methods used for detailing the cross-frames. Use of theoretical terms to describe these detailing methods and absence of complete and simplified design approac...

  6. Active Control of Long Bridges Using Flaps

    DEFF Research Database (Denmark)

    Hansen, H. I.; Thoft-Christensen, Palle

    The main problem in designing ultra-long span suspension bridges is flutter. A solution to this problem might be to introduce an active flap control system to increase the flutter wind velocity. The investigated flap control system consists of flaps integrated in the bridge girder so each flap...... is the streamlined part of the edge of the girder. Additional aerodynamic derivatives are shown for the flaps and it is shown how methods already developed can be used to estimate the flutter wind velocity for a bridge section with flaps. As an example, the flutter wind velocity is calculated for different flap...... configurations for a bridge section model by using aerodynamic derivatives for a flat plate. The example shows that different flap configurations can either increase or decrease the flutter wind velocity. for optimal flap configurations flutter will not occur....

  7. Development of radiographic technique for examining k-type butt weld

    International Nuclear Information System (INIS)

    Barui, K.L.; Bhattacharyya, B.

    1983-01-01

    An attempt is made to develop a radiographic technique for examining K-type full penetration butt joints in heavy duty crane girders. The existing standard techniques of radiographic examination is found to be unsuitable to assess the internal defects properly. The examination technique reported here is successful in detecting not only the nature of the internal defects but also their degree of severities - from which clues for avoiding the most probable defects can be found out. The results of radiographic examination applied on the K-type butt joints of heavy duty crane girders have been discussed and it is specified that the acceptable limit of the defects must lie between 'blue' and 'green' according to the IIW colour code. Much work is yet to be done before standard specifications regarding the acceptibility of the defects in the actual job can be formulated. (author)

  8. New magic angle bumps and magic translation bumps

    International Nuclear Information System (INIS)

    Seeman, J.

    1983-01-01

    SLC beams of opposite charge can be transversely deflected in the same direction by RF fields in the accelerating cavities caused by girder tilts, coupler-asymmetries, or manufacturing errors. A symmetric deflection can be corrected by a magic angle bump if the deflection is located adjacent to one of the linac quadrupoles. However, if the deflection is located between quadrupoles, two magic angle bumps or a magic angle bump and a magic translation bump are needed for the correction. Several examples of translation bumps are included. A new magic angle bump is also presented which is longitudinally compressed and has significantly reduced particle excursions. Finally, if new correctors are added midway along the girders so that the number of correctors are doubled, then the longitudinal extent and the maximum particle excursion of these new magic bumps can be further reduced

  9. Development of a new-type super-long bridge; Chochotaikyo ni tekigoshita shinkeishiki kyoryo no kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    Ogawa, K.; Shimodoio, H.; Saito, T.; Nogami, C.; Oryu, T.; Morikawa, M. [Kawasaki Heavy Industries, Ltd., Kobe (Japan)

    1998-12-20

    In order to realize large strait-crossing projects in the near future, it is necessary to develop a new type of super-long span bridge, which has a superior aerodynamic stability and is cost effective. We have been proposed a new type of suspension bridge using a 2-box and 1-box combined girder to apply to such a project And this time, we propose the cable stayed suspension bridge using a 2- box and 1-box combined girder aiming for improvement of aerodynamic stability with increase of torsional rigidity. This paper describes the performance of this cable stayed suspension bridge obtained from aerodynamic analysis. As a result, it can be confirmed that this newly developed cable stayed suspension system has fine characteristics and shows more potential for economical construction than the early proposed suspension system. (author)

  10. Electronic automation of LRFD design programs.

    Science.gov (United States)

    2010-03-01

    The study provided electronic programs to WisDOT for designing pre-stressed girders and piers using the Load : Resistance Factor Design (LRFD) methodology. The software provided is intended to ease the transition to : LRFD for WisDOT design engineers...

  11. Assessing the need for intermediate diaphragms in prestressed concrete bridges.

    Science.gov (United States)

    2008-03-01

    Reinforced concrete intermediate diaphragms (IDs) are currently being used in prestressed concrete (PC) girder bridges in Louisiana. Some of the advantages of providing IDs are disputed in the bridge community; the use of IDs increases the cost and t...

  12. Rating precast prestressed concrete bridges for shear

    Science.gov (United States)

    2008-12-01

    Shear capacity of real-world prestressed concrete girders designed in the 1960s and 1970s is a concern because : AASHTO Standard Specifications (AASHTO-STD) employed the quarter-point rule for shear design, which is less : conservative for shea...

  13. Appendix C : SR-72 tests.

    Science.gov (United States)

    2013-03-01

    The Florida highway system includes some of the earliest (circa 1950s) pretensioned : concrete bridges in the United States. Shear capacity of Floridas early pretensioned girders is of : interest because the early designs had thin webs and only li...

  14. Evaluating the time-dependent and bond characteristics of lightweight concrete mixes for Kansas prestressed concrete bridges : technical summary.

    Science.gov (United States)

    2011-07-01

    The majority of the bridges in Kansas are in rural areas. Many of these are : becoming structurally deficient, and are in need of replacement. Due to the location of : these bridges, cost of transporting prestressed girders to these areas often makes...

  15. STUDY OF BRIDGE DECK A REVIEW

    OpenAIRE

    MISS. KSHITIJA S. BALWAN , MR. V. G. KHURD , MR. S. S. CHOUGULE

    2018-01-01

    The objective of this study was to understand the meaning of bridge deck. To know the different forms of decks used in bridge design. To understand different methods used for analysis of deck and study of box girder and its evolution

  16. Hybrid FRP-concrete bridge deck system final report II : long term performance of hybrid FRP-concrete bridge deck system.

    Science.gov (United States)

    2009-06-01

    This report describes the investigation of the long term structural performance of a : hybrid FRP-concrete (HFRPC) bridge deck on steel girders. The study aimed at : assessing three long term aspects pertaining to the HFRPC bridge deck: (1) creep : c...

  17. Comprehensive evaluation of fracture critical bridges.

    Science.gov (United States)

    2014-02-01

    Two-girder steel bridges are classified as fracture critical bridges based on the definition given in the AASHTO LRFD Bridge Design Specifications. In a fracture critical bridge a failure of a tension member leads to collapse of the bridge. However, ...

  18. A technical report on structural evaluation of the Meade County reinforced concrete bridge : research [summary].

    Science.gov (United States)

    2009-01-01

    Meade County Bridge is a two-lane highway reinforced concrete bridge with two girders each with 20 continuous spans. The bridge was built in 1965. It has been reported that in early years of the bridge service period, a considerable amount of cracks ...

  19. Skewed steel bridges, part ii : cross-frame and connection design to ensure brace effectiveness : technical summary.

    Science.gov (United States)

    2017-08-01

    Skewed bridges in Kansas are often designed such that the cross-frames are carried parallel to the skew angle up to 40, while many other states place cross-frames perpendicular to the girder for skew angles greater than 20. Skewed-parallel cross-...

  20. Skewed steel bridges, part ii : cross-frame and connection design to ensure brace effectiveness : final report.

    Science.gov (United States)

    2017-08-01

    Skewed bridges in Kansas are often designed such that the cross-frames are carried parallel to the skew angle up to 40, while many other states place cross-frames perpendicular to the girder for skew angles greater than 20. Skewed-parallel cross-...

  1. Full Scale Measurements of the Hydro-Elastic Response of Large Container Ships for Decision Support

    DEFF Research Database (Denmark)

    Andersen, Ingrid Marie Vincent

    scale measurements from four container ships of 4,400 TEU, 8,600 TEU, 9,400 TEU and 14,000 TEU Primarily, strains measured near the deck amidships are used. Furthermore, measurements of motions and the encountered sea state are available for one of the ships. The smallest ship is in operation...... frequency with the waves. Together with the relatively high design speed and often pronounced bow flare this makes large container ship more sensitive to slamming and, consequently, the effects of wave-induced hull girder vibrations. From full scale strain measurements of individual, measured hull girder......The overall topic of this thesis is decision support for operation of ships and several aspects are covered herein. However, the main focus is on the wave-induced hydro-elastic response of large container ships and its implications on the structural response. The analyses are based mainly on full...

  2. On Grounding of Fast Ships

    DEFF Research Database (Denmark)

    Simonsen, Bo Cerup; Pedersen, Preben Terndrup

    1997-01-01

    The paper deals with analysis of grounding of high-speed crafts. It is the purpose to present a comprehensive mathematical model for calculation of the overall dynamic ship response during grounding. This procedure is applied to derive the motions, the time varying sectional forces and the local...... loads during grounding on plane, sloping, sandy bottoms for six different designs of fast monohull ships made from steel, aluminium or GRP sandwich materials. The results show that the effect of the hull flexibility is to reduce the overall dynamic sectional loads on the hull girder. The considered...... numerical examples also indicate that, even with impact speeds of 40 knots against a 1:10 sloping bottom, the global strength of the hull girder is not exceeded by the grounding induced loads.For the local deformation of high-speed ship hulls at the point of contact with the ground, the paper presents...

  3. Design Optimization of Hybrid FRP/RC Bridge

    Science.gov (United States)

    Papapetrou, Vasileios S.; Tamijani, Ali Y.; Brown, Jeff; Kim, Daewon

    2018-04-01

    The hybrid bridge consists of a Reinforced Concrete (RC) slab supported by U-shaped Fiber Reinforced Polymer (FRP) girders. Previous studies on similar hybrid bridges constructed in the United States and Europe seem to substantiate these hybrid designs for lightweight, high strength, and durable highway bridge construction. In the current study, computational and optimization analyses were carried out to investigate six composite material systems consisting of E-glass and carbon fibers. Optimization constraints are determined by stress, deflection and manufacturing requirements. Finite Element Analysis (FEA) and optimization software were utilized, and a framework was developed to run the complete analyses in an automated fashion. Prior to that, FEA validation of previous studies on similar U-shaped FRP girders that were constructed in Poland and Texas is presented. A finer optimization analysis is performed for the case of the Texas hybrid bridge. The optimization outcome of the hybrid FRP/RC bridge shows the appropriate composite material selection and cross-section geometry that satisfies all the applicable Limit States (LS) and, at the same time, results in the lightest design. Critical limit states show that shear stress criteria determine the optimum design for bridge spans less than 15.24 m and deflection criteria controls for longer spans. Increased side wall thickness can reduce maximum observed shear stresses, but leads to a high weight penalty. A taller cross-section and a thicker girder base can efficiently lower the observed deflections and normal stresses. Finally, substantial weight savings can be achieved by the optimization framework if base and side-wall thickness are treated as independent variables.

  4. INVESTIGATION OF LAUNCHING PROCESS FOR STEEL REINFORCED CONCRETE FRAMEWORK OF LARGE BRIDGES

    Directory of Open Access Journals (Sweden)

    V. A. Grechukhin

    2017-01-01

    Full Text Available Bridges are considered as the most complicated, labour-consuming and expensive components in roadway network of the Republic of Belarus. So their construction and operation are to be carried out at high technological level. One of the modern industrial methods is a cyclic longitudinal launching of large frameworks which provide the possibility to reject usage of expensive auxiliary facilities and reduce a construction period. There are several variants of longitudinal launching according to shipping conditions and span length: without launching girder, with launching girder, with top strut-framed beam in the form of cable-stayed system, with strut-framed beam located under span. While using method for the cyclic longitudinal launching manufacturing process of span is concentrated on the shore. The main task of the investigations is to select economic, quick and technologically simple type of the cyclic longitudinal launching with minimum resource- and labour inputs. Span launching has been comparatively analyzed with temporary supports being specially constructed within the span and according to capital supports with the help of launching girder. Conclusions made on the basis of calculations for constructive elements of span according to bearing ability of element sections during launching and also during the process of reinforced concrete plate grouting and at the stage of operation have shown that span assembly with application of temporary supports does not reduce steel spread in comparison with the variant excluding them. Results of the conducted investigations have been approbated in cooperation with state enterprise “Belgiprodor” while designing a bridge across river Sozh.

  5. Analysis of Biaxially Stressed Bridge Deck Plates

    DEFF Research Database (Denmark)

    Jönsson, Jeppe; Bondum, Tommi Højer

    2012-01-01

    The ultimate state analysis of bridge deck plates at the intersection zone between main girders and transverse beams is complicated by biaxial membrane stresses, which may be in compression or tension in either direction depending on the bridge configuration and the specific location. This paper...

  6. Analysis on Adhesively-Bonded Joints of FRP-steel Composite Bridge under Combined Loading : Arcan Test Study and Numerical Modeling

    NARCIS (Netherlands)

    Jiang, X.; Qiang, X.; Kolstein, M.H.; Bijlaard, F.S.K.

    2016-01-01

    The research presented in this paper is an experimental study and numerical analysis on mechanical behavior of the adhesively-bonded joint between FRP sandwich bridge deck and steel girder. Generally, there are three typical stress states in the adhesively-bonded joint: shear stress, tensile stress,

  7. Reliability of redundant ductile structures with uncertain system ...

    Indian Academy of Sciences (India)

    tance, applied loads and geometric parameters, and in some cases in the .... Statistical dependence among (i) girder strengths ... element reliability solution techniques; such formulation unfortunately remains ..... The spread of plasticity through a member after failure of a section .... The following form of the bivariate Gumbel.

  8. Hydroelastic Vibrations of Ships

    DEFF Research Database (Denmark)

    Jensen, Jørgen Juncher; Folsø, Rasmus

    2002-01-01

    A formula for the necessary hull girder bending stiffness required to avoid serious springing vibrations is derived. The expression takes into account the zero crossing period of the waves, the ship speed and main dimensions. For whipping vibrations the probability of exceedance for the combined...

  9. 23 CFR 971.104 - Definitions.

    Science.gov (United States)

    2010-04-01

    ... cooperative transportation decision-making for the metropolitan planning area pursuant to 23 U.S.C. 134 and 49... transportation other than private vehicles, including methods to improve system performance such as..., or cost standpoint. Examples are decks, joints, bearings, girders, abutments, and piers. Federal...

  10. Aerodynamic stability of long span suspension bridges with low torsional natural frequencies

    DEFF Research Database (Denmark)

    Andersen, Michael Styrk; Johansson, Jens; Brandt, Anders

    2016-01-01

    tests where the torsional frequency was lower than the vertical. But too low torsional stiffness caused large static displacements of the girder at medium–high wind speeds and steady state oscillations driven by a combination of torsional divergence and stalling behavior at the critical wind seed...

  11. Seismic Performance of Multi-Span RC Railway Bridges

    DEFF Research Database (Denmark)

    Georgakis, Christos; Barrau, Xavier

    2008-01-01

    Presently, there is no clear method for determining the optimal railway bridge design for a particular ground type and expected seismic intensity. Four main types of RC bridge dominate the current multi-span railway bridge design trends – the Simply Supported Beam, Continuous Box-Girder (CBG), CBG...

  12. Author Details

    African Journals Online (AJOL)

    Experimental Study on Flexural Response of FRP Strengthened Masonry Beams Abstract PDF · Vol 34, No 4 (2015) - Building, Civil & Geotechical Engineering Numerical and Experimental Modeling of the Static Response of Simply Supported Thin-Walled Box Girder Bridges Abstract PDF. ISSN: 2467-8821. AJOL African ...

  13. Strength of Ship Stiffened Panels under Combined Loading

    DEFF Research Database (Denmark)

    Weicheng, Cui; Wang, Young-jun; Pedersen, Preben Terndrup

    2000-01-01

    A ship's hull is a box girder structure composed of stiffened panels and therefore, strength of stiffened panels plays a significant role for the ultimate strength analysis of ship structures. In recent years several authors have proposed simplified methods to calculate the ultimate strength of s...

  14. Nigerian Journal of Technology - Vol 33, No 4 (2014)

    African Journals Online (AJOL)

    Evaluation of the Suitability of Low-Density Polyethylene (LDPE) Waste as Fine Aggregate in Concrete · EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT DOWNLOAD FULL ... Stress Distribution in Continuous Thin-Walled Multi-Cell Box Girder Bridges · EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT DOWNLOAD ...

  15. A software prototype for assessing the reliability of a concrete bridge superstructure subjected to chloride-induced reinforcement corrosion

    DEFF Research Database (Denmark)

    Schneider, Ronald; Thöns, Sebastian; Fischer, Johannes

    2014-01-01

    state of the box girder and a structural model for evaluating the overall system reliability. The condition model is based on a dynamic Bayesian network (DBN) model which considers the spatial variation of the corrosion process. Inspection data are included in the calculation of the system reliability...

  16. 78 FR 39436 - Temporary Closure of I-65 (I-70/I-65 South Split Interchange to I-70/I-65 North Split Interchange...

    Science.gov (United States)

    2013-07-01

    ..., which consists of replacing the northbound and southbound bridge girders and lowering the pavement..., Dockets Management Facility, Room W12-140, 1200 New Jersey Avenue SE., Washington, DC 20590, or fax... Jones, Office of Freight Management and Operations, Office of Operations, (202) 366-2976, Mr. Bill Winne...

  17. The state-of-the-art in the rehabilitation of a PIONEER Crane

    Directory of Open Access Journals (Sweden)

    Cosmin Bledea

    2005-10-01

    Full Text Available The paper is focused on the analysis about the state of stress in the girder of a PIONEER crane with a prescribed vertical loading of 0,75 tones belonging to the thermal power-station Timisoara. The analysis has been performed with a FEA software (COSMOS/M which is able to conduct to important results regarding the map of stress, especially in areas where high stress concentration are present. There have been automatically combined a wide range of finite elements: shell, brick, beam,truss-cable simulating the different zones of the girder. The combination of the most advanced standard components as well the implementation of the modular product concepts and the state-of-the-art regarding the design of cranes must be in a perfect agreement with the state of stress in the metallic structure. In the end, a comparison between the FEA results and the classical calculus with the strength of materials theory has been performed.

  18. A nuclear reactor

    International Nuclear Information System (INIS)

    Keller, W.

    1974-01-01

    Between the steel pressure vessel of the pressurized water power reactor and the biological shield a gap is found which enables inspections as well as cooling by air or gas. Within the gap, fins are equally distributed around the circumference of the pressure vessel summing parallel to each other and to the longitudinal axis of the vessel or being inclined. The fins cross the gap for about 9/10. Each fin consists of a sectional bar supported with its foot on a girder. The girder has got a rectangular steel section of two sectional iron parts. Between one of the parts and a plate anchored in the biological shield a ceramic body is inserted as a heat insulation. A further heat insulation of aluminium foils connects the fins with each other and divides the gap into two concentric subspaces which can be streamed through by a gas having different temperatures. (DG) [de

  19. ISSUES AND FEASIBILITY DEMONSTRATION OF CLIC SUPPORTING SYSTEM CHAIN ACTIVE PRE-ALIGNMENT USING A MULTI-MODULE TEST SETUP (MOCK-UP)

    CERN Document Server

    Sosin, Mateusz

    2016-01-01

    The implementation study of the CLIC (Compact LInear Collider) is under way at CERN with a focus on the challenging issues. The pre-alignment precision and accuracy requirements are part of these technical challenges: the permissible transverse position errors of the linac components are typically 14 micrometers over sliding windows of 200m. To validate the proposed methods and strategies, the Large Scale Metrology section at CERN has performed campaigns of measurements on the CLIC Two Beam Test Modules, focusing inter alia on the alignment performance of the CLIC “snake”- girders configuration and the Main Beam Quadrupoles supporting structures. This paper describes the activities and results of tests which were performed on the test mock-up for the qualification of the CLIC supporting system chain for active pre-alignment. The lessons learnt (“know how”), the issues encountered in the girder position determination as well as the behaviour of the mechanical components are presented.

  20. Design, Construction and Installation of the ATLAS Hadronic Barrel Scintillator-Tile Calorimeter

    CERN Document Server

    Abdallah, J; Alexa, C; Alves, R; Amaral, P; Ananiev, A; Anderson, K; Andresen, X; Antonaki, A; Batusov, V; Bednar, P; Bergeaas, E; Biscarat, C; Blanch, O; Blanchot, G; Bohm, C; Boldea, V; Bosi, F; Bosman, M; Bromberg, C; Budagov, Yu A; Calvet, D; Cardeira, C; Carli, T; Carvalho, J; Cascella, M; Castillo, M V; Costello, J; Cavalli-Sforza, M; Cavasinni, V; Cerqueira, A S; Clément, C; Cobal, M; Cogswell, F; Constantinescu, S; Costanzo, D; Da Silva, P; Davidek, M; David, T; Dawson, J; De, K; Del Prete, T; Di Girolamo, B; Dita, S; Dolejsi, J; Dolezal, Z; Dotti, A; Downing, R; Drake, G; Efthymiopoulos, I; Errede, D; Errede, S; Farbin, A; Fassouliotis, D; Feng, E; Fenyuk, A; Ferdi, C; Ferreira, B C; Ferrer, A; Flaminio, V; Flix, J; Francavilla, P; Fullana, E; Garde, V; Gellerstedt, K; Giakoumopoulou, V; Giangiobbe, V; Gildemeister, O; Gilewsky, V; Giokaris, N; Gollub, N; Gomes, A; González, V; Gouveia, J; Grenier, P; Gris, P; Guarino, V; Guicheney, C; Sen-Gupta, A; Hakobyan, H; Haney, M; Hellman, S; Henriques, A; Higón, E; Hill, N; Holmgren, S; Hruska, I; Hurwitz, M; Huston, J; Jen-La Plante, I; Jon-And, K; Junk, T; Karyukhin, A; Khubua, J; Klereborn, J; Kopikov, S; Korolkov, I; Krivkova, P; Kulchitsky, Y; Kurochkin, Yu; Kuzhir, P; Lapin, V; Le Compte, T; Lefèvre, R; Leitner, R; Li, J; Liablin, M; Lokajícek, M; Lomakin, Y; Lourtie, P; Lovas, L; Lupi, A; Maidantchik, C; Maio, A; Maliukov, S; Manousakis, A; Marques, C; Marroquim, F; Martin, F; Mazzoni, E; Merritt, F S; Myagkov, A; Miller, R; Minashvili, I; Miralles, L; Montarou, G; Némécek, S; Nessi, M; Nikitine, I; Nodulman, L; Norniella, O; Onofre, A; Oreglia, M; Palan, B; Pallin, D; Pantea, D; Pereira, A; Pilcher, J E; Pina, J; Pinhão, J; Pod, E; Podlyski, F; Portell, X; Poveda, J; Pribyl, L; Price, L E; Proudfoot, J; Ramalho, M; Ramstedt, M; Raposeiro, L; Reis, J; Richards, R; Roda, C; Romanov, V; Rosnet, P; Roy, P; Ruiz, A; Rumiantsau, V; Russakovich, N; Sada Costa, J; Salto, O; Salvachúa, B; Sanchis, E; Sanders, H; Santoni, C; Santos, J; Saraiva, J G; Sarri, F; Says, L P; Schlager, G; Schlereth, J L; Seixas, J M; Selldén, B; Shalanda, N; Shevtsov, P; Shochet, M; Simaitis, V; Simonyan, M; Sisakian, A; Sjölin, J; Solans, C; Solodkov, A; Solovianov, J; Silva, O; Sosebee, M; Spanó, F; Speckmeyer, P; Stanek, R; Starchenko, E; Starovoitov, P; Suk, M; Sykora, I; Tang, F; Tas, P; Teuscher, R; Tokar, S; Topilin, N; Torres, J; Underwood, D; Usai, G; Valero, A; Valkár, S; Valls, J A; Vartapetian, A; Vazeille, F; Vellidis, C; Ventura, F; Vichou, I; Vivarelli, I; Volpi, M; White, A; Zaitsev, A; Zenin, A; Zenis, T; Zenonos, Z; Zenz, S; Zilka, B

    2007-01-01

    The scintillator tile hadronic calorimeter is a sampling calorimeter using steel as the absorber structure and scintillator as the active medium. The scintillator is located in "pockets" in the steel structure and the wavelength-shifting fibers are contained in channels running radially within the absorber to photomultiplier tubes which are located in the outer support girders of the calorimeter structure. In addition, to its role as a detector for high energy particles, the tile calorimeter provides the direct support of the liquid argon electromagnetic calorimeter in the barrel region, and the liquid argon electromagnetic and hadronic calorimeters in the endcap region. Through these, it indirectly supports the inner tracking system and beam pipe. The steel absorber, and in particular the support girders, provide the flux return for the solenoidal field from the central solenoid. Finally, the end surfaces of the barrel calorimeter are used to mount services, power supplies and readout crates for the inner tr...

  1. Improved design of large wind turbine blades of fibre composites (Phase 2) - Summary Report

    Energy Technology Data Exchange (ETDEWEB)

    Soerensen, B.F. [Risoe National Lab., Materials Research Dept., Roskilde (Denmark); Branner, K. [Risoe National Lab., Wind Energy Dept., Roskilde (Denmark); Stang, H. [Technical Univ. of Denmark, Dept. of Civil Engineering, Kgs. Lyngby (Denmark); Jensen, H.M. [Aalborg Univ., Dept. of Building Technology and Structural Engineering (Denmark); Lund, E. [Aalborg Univ., Inst. of Mechanical Enginering (Denmark); Jacobsen, T.K. [LM glasfiber A/S, Lunderskov (Denmark); Halling, K.M. [Vestas Wind Systems A/S, Ringkoebing (Denmark)

    2005-08-01

    The major results of Phase 2 of a project concerning the development of new design methods for wind turbine blades are summarised. Finite element models were used for studying the buckling behaviour of a box girder, tested to failure in Phase 1 of this project. The deformation behaviour of a box girder section subjected to transverse forces was investigated experimentally and by modelling. Buckling-driven delamination of planar specimens was studied on experimentally and by modelling. A novel approach was proposed for the determination of mixed mode cohesive laws for large-scale crack bridging problems. The normal and shear stresses of the cohesive laws were obtained from data of the fracture resistance and the normal and tangential displacements of the cohesive zone. Delamination of a thin layer bonded to an elastic substrate close to corners and edges was also analysed. Results for the shape of the interface crack front and critical stress for steady-state delamination were obtained. (au)

  2. Structural Behavior of a Long-Span Partially Earth-Anchored Cable-Stayed Bridge during Installation of a Key Segment by Thermal Prestressing

    Directory of Open Access Journals (Sweden)

    Sang-Hyo Kim

    2016-08-01

    Full Text Available This study investigated structural behavior of long-span partially earth-anchored cable-stayed bridges with a main span length of 810 m that use a new key segment closing method based on a thermal prestressing technique. A detailed construction sequence analysis matched with the free cantilever method (FCM was performed using a three-dimensional finite element (FE model of a partially earth-anchored cable-stayed bridge. The new method offers an effective way of connecting key segments by avoiding large movements resulting from the removal of the longitudinal restraint owing to the asymmetry of axial forces in the girders near the pylons. The new method develops new member forces through the process of heating the cantilever system before installing the key segment and cooling the system continuously after installing key segments. The resulting forces developed by the thermal process enhance the structural behavior of partially earth-anchored cable-stayed bridges owing to decreased axial forces in the girders.

  3. Technical Monitoring System for a New Part of Gdańsk Deepwater Container Terminal

    Directory of Open Access Journals (Sweden)

    Miśkiewicz Mikołaj

    2017-04-01

    Full Text Available Development strategy for the port of Gdańsk assumes that , up to 2027, it will become the main transport centre in the Baltic Sea region. To this end , for many years work has been carried out to facilitate access to the port both by sea and land. One of the elements of extension of the port is the building of another terminal of Deepwater Container Terminal, Gdańsk. In this task, geotechnical operations aimed at appropriate preparation of subgrade for storage of containers and operation of cranes, have been especially important. Effectiveness of the assumed design solution of land-side girder for gantry crane has been verified by means of a technical monitoring system. This paper presents main elements of design the land-side girder of a new quay of the container terminal in Gdańsk, together with its computational analysis, as well as the results collected during a few months of observation, which have revealed real work of monitored elements.

  4. Experimental investigation on FRP to steel adhesively-bonded joint under tensile loading

    NARCIS (Netherlands)

    Jiang, X.; Kolstein, M.H.; Bijlaard, F.S.K.

    2012-01-01

    Due to various advantages of Fibre-Reinforced Polymer (FRP) decks, the FRP to steel composite girder system is being increasingly used in the construction of new bridges as well as the rehabilitation projects of old bridges. This paper focus on the mechanical behaviors and failure modes of the

  5. Sadhana | Indian Academy of Sciences

    Indian Academy of Sciences (India)

    Bridges are one of the most crucial facilities of transportation networks. Therefore, evaluation of the seismic vulnerability of bridge structures is perpetually regarded topic for researchers. In this study, we developed seismic fragility curves for a continuous steel box girder bridge considering the effect of differentlevels of ...

  6. Numerical investigation of the bearing capacity of transversely prestressed concrete deck slabs

    NARCIS (Netherlands)

    Amir, S.; Van der Veen, C.; Walraven, J.C.; De Boer, A.

    2014-01-01

    The research subject of this paper is the bearing capacity of transversely prestressed concrete bridge decks between concrete girders under concentrated loads. Experiments on a 1:2 scale model of this bridge were carried out in the laboratory and a 3D nonlinear finite element model was developed in

  7. Research Article Special Issue

    African Journals Online (AJOL)

    2016-05-15

    May 15, 2016 ... bridge deck and girders, but the first highway applications were in France ... Other advantages are such as the ability to span voids that develop ... Recent progresses in software programing made it simple to utilize ... Recognizing the importance of knowledge gained by existing rigid pavement design, the.

  8. An engineering design study of the support platform assembly for the SSC SDC detector

    International Nuclear Information System (INIS)

    Krebs, H.J.; Western, J.L.; Wands, R.H.

    1993-04-01

    A large angular acceptance high energy physics particle detector is presently being designed by the Solenoidal Detector Collaboration for the purposes of doing high pt physics at the Superconducting Super Collider Laboratory. The support platform assembly is the structural device which transfers the 30,000 tonne gravitational load of the octagonally shaped muon barrel toroid and the other detector components to the foundation below. The detector components are very sensitive to differential deflection and rely on the barrel toroid and support platform for stability. The operational load path is provided by two pairs of inclined longitudinal plates resting at 67.5 degree on three pairs of plate girders that are positioned in-line in Z. The plate girders are held together laterally with 38 tie bars and supported vertically by the vertical adjustment system. The lateral stability of the inclined plates is provided by 22 stabilizer beams with cross bracing between each beam. The Z location of each split in the plate girder is coincident with the Z location of the gap in the calorimeter (4428 nun from the detector center.) The width of each split is 155 mm to allow installation of the alignment reference system. The collider beam line in the IR-8 underground experimental hall is oriented at a 2.16 mm/m slope from south to north as shown in Figure 2. The support is designed and installed to provide this slope at the top surface of the inclined plates. The assembled support rests on a ten foot thick steel reinforced 8000 psi concrete slab. The slab has a 2 mm differential deflection criteria under nominal gravitational loading

  9. Soportes apoyados sobre vigas pretensadas (EE. UU.

    Directory of Open Access Journals (Sweden)

    Editorial, Equipo

    1965-12-01

    Full Text Available This work has been awarded a prize by the Prestreesed Concrete Institute. It refers to a number of flyovers on the Arroyo Seco, of California. This river has been canalized, to help drainage in case of heavy rainfall. The canal runs through a highly populated zone, and a motor road and accessory ramps had to cross the canal. The resulting design involves three prestressed girders, lightly arched in a parabolic outline, resting on each river shore, running along the line of the bridge, over the canal. It was decided that the bridge piles should not rest on the river bed, in order not to reduce its flow capacity. The girders of a maximum length of 39 ms, are box shaped, and stiffened with thin diaphragms. The cylindrical pile, 1.50 m in diameter, is an integral part of the girder, and applies to it a concentrated load of about 4000 tons. The girders rest on reinforced concrete cubes, which in turn are supported by concrete slabs and piles driven into the soil.Esta obra ha sido premiada por el Prestressed Concrete Institute y se refiere a una serie de pasos superiores sobre el Arroyo Seco, en California, que se ha canalizado para servir de desagüe en el caso de avenidas torrenciales. El canal se halla en una zona de edificación densa y se trata del paso—sobre aquél—de una autopista y rampas de acceso. La solución adoptada consistió en tres vigas pretensadas, ligeramente arqueadas con perfil parabólico, apoyadas en las dos márgenes y situadas en correspondencia con los tres soportes, sobre el propio canal, ya que ninguno de aquéllos debía apoyarse en el lecho de este último al objeto de no disminuir su capacidad de desagüe. Las vigas—de unos 39 m de longitud la mayor—son del tipo cajón, rigidizadas con unos diafragmas de pequeño espesor. El soporte cilíndrico, de 1,50 m de diámetro, se solidariza con la viga y le transmite una notable carga concentrada, del orden de 4.000 toneladas. Los apoyos de estas vigas son simples dados

  10. 29 CFR 1926.854 - Removal of walls, masonry sections, and chimneys.

    Science.gov (United States)

    2010-07-01

    ..., girders, and similar structural supports shall be cleared of all loose material as the masonry demolition... 29 Labor 8 2010-07-01 2010-07-01 false Removal of walls, masonry sections, and chimneys. 1926.854....854 Removal of walls, masonry sections, and chimneys. (a) Masonry walls, or other sections of masonry...

  11. 26 CFR 1.48-10 - Single purpose agricultural or horticultural structures.

    Science.gov (United States)

    2010-04-01

    ... the rafters by thin steel girders and wires. The floor of the structure is a sloping concrete slab... commercial production of plants. The greenhouse is a rectangular structure with translucent fiberglass walls... structure has a sloping concrete floor. The other part of the structure constitutes more than two-thirds of...

  12. Improving Performance of Polymer Fiber Reinforced Sandwich X-Joints in Naval Vessels

    DEFF Research Database (Denmark)

    Berggreen, Christian; Lundsgaard-Larsen, Christian; Karlsen, Kasper

    2007-01-01

    In many naval ships of fiber composite sandwich construction an X-joint exists where the end bulkhead of the superstructure is attached to the deck, with a bulkhead placed in the same vertical plane below the deck. As the hull girder flexes this joint is subjected to alternating tensile and compr...

  13. Demonstration of Corrosion-Resistant Hybrid Composite Bridge Beams for Structural Applications

    Science.gov (United States)

    2016-09-01

    published by ERDC, visit the ERDC online library at http://acwc.sdp.sirsi.net/client/default. DoD Corrosion Prevention and Control Program ERDC/CERL...loading condition was con- trolled by positive flexure of the center girder at midspan. The HL-93 load rating was controlled by the two lanes loaded

  14. CFRP strengthened openings in two-way concrete slabs

    DEFF Research Database (Denmark)

    Enochsson, O.; Lundqvist, J.; Täljsten, Björn

    2006-01-01

    are very suitable, not only because of their strength, but also due to that they are easy to apply in comparison to traditional steel girders or other lintel systems. Even though many benefits have been shown by strengthening openings with FRPs not much research have been presented in the literature...

  15. Report of the Commanding General Eighth Army on the PANAY-NEGROS and CEBU Operations Victor I and II

    Science.gov (United States)

    1946-01-01

    of abutment ) . 10 - 110 pound Japanese bombs (around girders and braces).?- The Seizure of BACOLOD and Nearby Airfields. The following day, the 1st...constructed, prefabricated buildings in C35BU CITY. On 15 June, the 59th Station Hospital and the 75th Medical Depot Section, which had arrived in the

  16. Reflective Cracking between Precast Prestressed Box Girders

    Science.gov (United States)

    2017-06-30

    The adjacent precast prestressed concrete box-beam bridge is the bridge of choice for short and short-to-medium span bridges. This choice is because of the ease of construction, favorable span-to-depth ratios, aesthetic appeal, and high torsional sti...

  17. Self-compacting concrete for prestressed bridge girders

    Science.gov (United States)

    Erkmen, Bulent

    The purpose of this study was to examine social mobility as a motivation for first-generation college students in reaching attainment at two-year technical colleges. The research question was to what degree has the perception of social mobility influenced first generation college students at technical colleges to complete their career educational goals. Graduates of a two-year technical college were asked a series of open-ended questions regarding their past experiences and perceptions of attending and completing a two-year technical college program; their childhood perceptions of their social status; and experiences with family members regarding their change in social class status. These questions were designed to determine their feelings, viewpoints, reflections, experiences, struggles, and thoughts about attainment (completing their post-secondary education) and the extent to which social mobility influenced their decision to complete their education. The benefits of this research include an understanding of social mobility and educational attainment. Results of this study could be used to better understand the process that first generation college students go through in order to attain their educational goals. The information from this study may be useful for technical college administrations to help design programs and processes for future first-generation college students' success and aid in retention of these students.

  18. Experimental study on AR fiberglass connectors for bridges made of composite materials

    Directory of Open Access Journals (Sweden)

    Tolosana, N.

    2006-06-01

    Full Text Available One highly relevant aspect in composite material bridgedesing is the study of the shear connectors to be used.Composite material bridges most commonly comprise acomposite deck resting on steel or reinforced concrete girders.This article analyzes the connectors most frequentlyused in such bridges.It also reviews the connectors used in the King StormwaterChannel Bridge, whose fibreglass deck is supported bygirders made of concrete-filled carbon fibre girders.The paper advances proposals for several types of connectorsand discusses the results of push-out test run ona number of prototypes with different geometries.The results are analyzed to identify the optimum model forthe “Autovia del Cantabrico” Overpass, with its 46-m span,carbon fibre girders and AR glass shear connectors.Un aspecto relevante dentro del proyecto de un puenterealizado en materiales compuestos es el estudio de losconectores. El caso mas frecuente de puente en materialescompuestos es aquel que presenta un tablero de materialescompuestos soportado por vigas metalicas o de hormigonarmado. En este trabajo se analizaran los tipos deconectores mas utilizados en este tipo de puentesSe analizaran tambien los conectores utilizados en elKing Stormwater Channel Bridge, donde ademas deltablero en fibra de vidrio, se fabricaron las vigas en fibrasde carbono rellenas de hormigon.En este articulo se propondran varios tipos de conectoresy se presentaran los resultados experimentales correspondientesal ensayo de “push-out” de varios prototipos condiferentes geometrias.Tras evaluar los resultados, se determinara el mas idoneopara su implantacion en el Paso Superior de la Autovia delCantabrico, de 46 metros de luz y que presenta las vigasen fibra de carbono y los conectores de vidrio AR.

  19. Author Details

    African Journals Online (AJOL)

    Chakri, Asma. Vol 35 (2017) - Articles Optimization of the box-girder of overhead crane with constrained new bat algorithm. Abstract PDF. ISSN: 2352-9717. AJOL African Journals Online. HOW TO USE AJOL... for Researchers · for Librarians · for Authors · FAQ's · More about AJOL · AJOL's Partners · Terms and Conditions ...

  20. Design Of Overhead Roadway At Road Intersection

    Directory of Open Access Journals (Sweden)

    Raji

    2017-08-01

    Full Text Available This project deals with the Design of overhead-roadway located at CHALLENGE junction which is a T-junction. Analysis of the existing conditions was carried out to proffers solution to the cause of the problems occurring due to the vehicle competing for space at this intersection. Before carrying out the analysis a traffic surveys at peak hours for morning 0730 to 0830 am and afternoon 0300 to 0400 pm were conducted using 15 minutes interval. From the analysis it was found out that the peak hour factor and flow rate was 0.88 and 1656pcphpl respectively corresponding to LOS E. This implies that the capacity of the existing road is no longer able to accommodate the traffic flow hence overhead roadway was introduced to improve the efficiency of the intersection. The overhead-roadway is of 140 m length with 7 spans 20 m per span. It consists of a deck slab longitudinal girders cross girders deck beam pier foundation and retailing wall. All structural parts for this Flyover were designed using Staad professional software package and Manual method.

  1. Dynamic response analysis of the LBL Advanced Light Source synchrotron radiation storage ring

    International Nuclear Information System (INIS)

    Leung, K.

    1993-05-01

    This paper presents the dynamic response analysis of the photon source synchrotron radiation storage ring excited by ground motion measured at the Lawrence Berkeley Laboratory advanced light source building site. The high spectral brilliance requirement the photon beams of the advanced light source storage ring specified displacement of the quadrupole focusing magnets in the order of 1 micron in vertical motion.There are 19 magnets supported by a 430-inch steel box beam girder. The girder and all magnets are supported by the kinematic mount system normally used in optical equipment. The kinematic mount called a six-strut magnet support system is now considered as an alternative system for supporting SSC magnets in the Super Collider. The effectively designed and effectively operated six-strut support system is now successfully operated for the Advanced Light Source (ALS) accelerator at the Lawrence Berkeley Laboratory. This paper will present the method of analysis and results of the dynamic motion study at the center of the magnets under the most critical excitation source as recorded at the LBL site

  2. Cable-stayed bridge No. 1 Hikihara bridge'' ( Karauko bridge'') for Kinki construction bureau, ministry of construction. Kensetsusho kinki chiho kensetsukyoku (Hikihara 1 gobashi (Karauko ohashi))no shiko

    Energy Technology Data Exchange (ETDEWEB)

    1991-11-01

    This paper summarizes the design, fabrication and erection of a back-anchor integrated single span cable suspension bridge (178 m long and 9.7 m wide) constructed over an ordinary road crossing a reservoir. This type of structure was adopted because the locational condition does not allow a bridge pier to be erected in the center of the pond, and the topography in the construction starting side has steep slopes and many places having fragile ground beds. This bridge employed precast floor plates using the Compo-Slab (manufactured by Ishikawajima Building Material Company). Main points which require attentions are listed in designing and fabricating the main towers (48 m high), main girders, and cables, as well as fabricating the precast cast floor plates (a panel has a length of 9.7 m, maximum width of 2 m, and maximum weight of 10 tons). The main towers were erected using 160-tf truck cranes, and the main girders were erected by the overhang method using 20-tf gate-type travel cranes. 3 refs., 14 figs.

  3. Practical cable tension adjustment based upon the satisfaction concept of bridge designers; Sekkeisha no manzokudo wo koryo shita fuzzy cable choryoku choseiho

    Energy Technology Data Exchange (ETDEWEB)

    Kaneyoshi, M.; Tanaka, H. [Hitachi Zosen, Tokyo (Japan)] Furuta, H. [Kansai Univ., Osaka (Japan)

    1998-07-21

    Cable tension adjustment of bridge beam of cable stayed bridge and so forth that uses cable as a structural element is classified into (1) pre-stress adjustment of cable at design level, (2) slim adjustment required at erection level. The former deals with the structurally high dimensional statically indeterminate structures like cable-stayed bridges and is a process for carrying out economical design by making the stress resultant of main girder small due to the introduction of appropriate pre-stress stress on this cable. The later is the process of getting rid off the errors caused in cable tension and camber of girder and tower regarding various errors such as design, fabrication and erection errors. The authors developed analysis method using fuzzy regression analysis and this has been applied in number of practical bridges. In this research, much more practical method is developed where the aspire of designer can be introduced easily by applying the satisfaction concept. By using this, pre-stress adjustment and shim adjustment of cable can be possible in a practical way. 9 refs., 7 figs., 8 tabs.

  4. Method of dismantling a nuclear reactor

    International Nuclear Information System (INIS)

    Shirai, Masato; Hashimoto, Osamu.

    1984-01-01

    Purpose: To enable rapid and simple positioning for a plasma arc torch disposed to the inside of a nuclear reactor main body. Method: After removing the upper semi-spherical portion, fuel portion and control rod portion of a nuclear reactor, a rotary type girder is placed on the upper edge of a cylindrical portion remained after the removal of the upper semi-spherical portion. Then, the upper portion of a supporting rod provided with a swing arm having a plasma arc torch at the top end is situated at the center of the reactor main body. Then, the top end of the support rod is inserted to fix in the housing of control rod drives. Then, the swing arm is actuated to situate the plasma arc torch to a desired position to be cut, whereafter cutting is initiated while rotating the rotary type girder. Thus, plasma arc torch is moved horizontally along an arcuate trace, whereby pipeways, accessories or the likes disposed to the inside of the main body are at first cut and then the cylindrical portion constituting the main body is cut to dismantle the reactor. (Moriyama, K.)

  5. Notes on the rf system for the SLC positron source

    Energy Technology Data Exchange (ETDEWEB)

    Hoag, H.

    1984-10-17

    The proposed arrangement of accelerator structures, waveguide feeds and klystrons is shown. A 50 MW klystron at 20-3C will provide power for the high-field capture section immediately following the target. About 1 meter downstream of this section there will be a standard girder of four 3.05-meter SLAC constant gradient accelerator sections. These will be powered by a klystron at station 20-3D. Current thinking is that this will also be a 50 MW tube, but 35 MW might well be sufficient. Both stations will be SLEDded. The length of the rectangular waveguide feed to the capture section will be approximately 132 ft, and the attenuation will be about 0.97 db. The corresponding numbers for the feed to the standard girder are 153 ft and 1.07 db. In CN-268 dated 6/22/84: Positron Source: First 50 Nanoseconds, K. Moffeit shows that good positron acceptance requires very high accelerating fields (on the order of 70 MV/m) in the first meter following the target. Various ways of approaching this gradient in a 1-meter section have been examined.

  6. Modal analysis of railway bridge hangers using artificial and ambient excitation

    Science.gov (United States)

    Link, M.; Weiland, M.; Yu, F.

    2002-12-01

    This paper describes the methods used and results obtained from analysing some resonance phenomena which were observed on a steel railway bridge. These phenomena were visible on the slender hangers connecting the arch girder and the main truss girder under certain wind conditions. The paper describes the set up of a vibration monitoring system designed to measure the vibration response of the hangers together with the wind velocity and the wind direction over a period of several months under operational conditions. These data should yield the basis for correlating the wind and the structural characteristics. In addition artificial impulse hammer excitation was used to measure the modal characteristics (natural frequencies and modes of the hangers separately. The results of these tests compared well with those obtained from applying some “output only" modal identification techniques to the operational response data with unknown excitation forces. The results also compared well to analytical predictions and were used to identify the axial forces in the hangers by updating the axial force minimising the test/analysis deviations. The results allowed to estimate the fatigue life of the hangers confirming the need for the design of anti- vibration devices.

  7. Disassembly of an arch bridge deformed due to landslide activity and the replacement of a new bridge in the same site. Jisuberi ni yori henkei shita arch bashi no kaitai to shinbashi no kakekae

    Energy Technology Data Exchange (ETDEWEB)

    Sano, S; Morimoto, C; Tomoda, T; Mizukawa, Y; Onushi, M; Ito, T [Kawasaki Heavy Industries, Ltd., Tokyo (Japan)

    1991-10-20

    This report describes the replacement process of an arch bridge deformed due to landslide activity, selection and contents of the disassembly method, and configuration of the new bridge and its design method. The Ryugu Bridge had been damaged by landslides over an extended period. It was a deck arch bridge having originally a span of 74 meters, but it had shortened by 424 mm due to landslide activity during 14 years since its completion. Then it was decided to be replaced by a new bridge having an adjustable structure to support the movement of its abutments. As disassembly of the deformed arch bridge could be dangerous, the best methodology was studied, and the disassembly was carried out by the cable method. The new bridge had box-girder parts in both side of the main truss, so as to be adjustable to the change of the span length, and the bridge was designed for a working life of 50 years if the bearing supports and expansion joints were reset every 10 years. Concerning the connecting parts between the box-girder and the main truss, appropriateness of the sectional configuration was verified by FEM analysis. 9 refs., 18 figs., 2 tab.

  8. Evaluating the performance of skewed prestressed concrete bridge after strengthening

    Science.gov (United States)

    Naser, Ali Fadhil; Zonglin, Wang

    2013-06-01

    The objectives of this paper are to explain the application of repairing and strengthening methods on the damaged members of the bridge structure, to analyze the static and dynamic structural response under static and dynamic loads after strengthening, and to evaluate the structural performance after application of strengthening method. The repairing and strengthening methods which are used in this study include treatment of the cracks, thickening the web of box girder along the bridge length and adding internal pre-stressing tendons in the thickening web, and construct reinforced concrete cross beams (diaphragms) between two box girders. The results of theoretical analysis of static and dynamic structural responses after strengthening show that the tensile stresses are decreased and become less than the allowable limit values in the codes. The values of vertical deflection are decreased after strengthening. The values of natural frequencies after strengthening are increased, indicating that the strengthening method is effective to reduce the vibration of the bridge structure. Therefore, the strengthening methods are effective to improve the bearing capacity and elastic working state of the bridge structure and to increase the service life of the bridge structure.

  9. Field vibration test of a long-span cable-stayed bridge by large exciters. Daishinpuku kashin ni yoru chodai shachokyo no jikkyo shindo jikken

    Energy Technology Data Exchange (ETDEWEB)

    Okauchi, I. (Chuo University, Tokyo (Japan). Faculty of Science and Engineering); Miyata, T. (Yokohama National University, Yokohama (Japan). Faculty of Engineering); Sasaki, N. (Mitsubishi Heavy Industries, Ltd., Tokyo (Japan)); Tatsumi, M.

    1992-10-15

    Long-span cable-stayed bridge requires indispensably discussions on safety against gale and earthquake, and correct assessment on its inherent vibration characteristics at the design stage is critical. However, theoretical assessment on structural decay is difficult, hence it is desirable to make measurement and verification upon its completion. This paper reports the result of measurements and considerations on a three-span continuous steel cable-stayed bridge with a length of 790 m (185 m + 420 m + 185 m) spanning between Hitsuishi Island and Iwakuro Island in the Kojima-Sakaide route of the Honshu-Shikoku connecting bridge. Large shaking machines were used to give girders vibrations with large amplitudes (10 cm at maximum), and high-accuracy measurements were made. The measurements verified the reasonability of the dynamic design for the bridge. The measured value of the logarithmic decay rate [delta] as the major experimental data presented that bending vibration is large as a whole, with torsional vibration somewhat smaller, and all the design values were on safety side. Confirmation was made on amplitude dependence of the decay rate, the inherent modes of low-order vibrations, and coupled behaviors among the girders, cables, and towers. 16 refs., 13 figs., 3 tabs.

  10. Design of Usui bridge (PC cable stayed bridge). Usuihashi (PC shachokyo) no sekkei ni tsuite

    Energy Technology Data Exchange (ETDEWEB)

    Kido, M.; Iizuka, Y. (Japan Highway Public Corp., Tokyo (Japan)); Tanaka, S.; Otsuka, K. (P.S. Concrete Co. Ltd. Kajima Corp. Joint Venture, Tokyo (Japan)); Kitakuni, S. (Kajima Corp., Tokyo (Japan))

    1991-11-30

    Structure and design of single suspension PC cable bridge, which is first kind of high way bridge in Japan and aiming to start for general use by March, 1993, are reported. As a construction outline, main construction quantity and general layout of the whole bridge together with the selective detail and characteristics of the diagonal member, tower, main girder and tower support member, are cited. Design conditions( load, materials, allowable stress and others ), basic plan of the design, and structure analysis( surface stress framed structure analysis, stereoscopic framework analysis and FEM analysis of local stress ) are explained. Design of structure member like main girder is based on diagonal member tension, wave shearing force, level of diagonal strain stress, bending stress when diagonal member anchors the deformed main tower caused by living load during earth quake, principal stress of main tower junction and local stress etc. Main tower support member design is based on the results of corbel shearing force at varied cross section and main stress, and diagonal member design is decided by allowable stress. Diagonal member anchorage traverse beam design depends on bending moment of traverse beam and shearing force. 3 refs., 15 figs., 1 tab.

  11. Exciting test of a floating type cable stayed bridge and its response observation under the typhoon; Furotiingu keishiki shachokyo (Utagenkabashi) no kishinki shiken to taifuji oto kansoku

    Energy Technology Data Exchange (ETDEWEB)

    Uno, K. [Kyushu Kyoritsu Univ., Kitakyushu (Japan). Faculty of Engineering; Aso, T. [Yamaguchi Univ., Ube (Japan). Faculty of Engineering; Kitagawa, S. [Kyushu International Univ., Kitakyushu (Japan). Faculty of Economy; Kabashima, S.

    1995-09-20

    Recently, in case of the planning and designing of bridges, of course its practicality and execution stability are considered, but consideration for landscape also is a large problem. In particular, the selection of the bridge type is very important in order to protect the beautiful natural landscape. The cable stayed bridge has become to be executed often, owing to its elegant style, however, it becomes important theme clarify the antiseismic and wind stability because of its complicated structure system and very slender girder. In this paper, the results of the dynamic characteristics of a floating type cable stayed bridge (length 292.1 m and width 14.9 m) and the observation of its dynamic behavior under the typhoon are reported. Microtremor measurement was performed to determine the dynamic characteristics of the bridge under construction. After the construction of the bridge, the excitation test was carried out in order to confirm its natural frequencies, vibration modes and damping constants. From the results of the observation of the dynamic behavior of the girder and cables under the typhoon, the wind stability of this bridge was confirmed. 10 refs., 13 figs., 9 tabs.

  12. Electron Beam Alignment Strategy in the LCLS Undulators

    International Nuclear Information System (INIS)

    Nuhn, H

    2007-01-01

    The x-ray FEL process puts very tight tolerances on the straightness of the electron beam trajectory (2 (micro)m rms) through the LCLS undulator system. Tight but less stringent tolerances of 80 (micro)m rms vertical and 140 (micro)m rms horizontally are to be met for the placement of the individual undulator segments with respect to the beam axis. The tolerances for electron beam straightness can only be met through beam-based alignment (BBA) based on electron energy variations. Conventional alignment will set the start conditions for BBA. Precision-fiducialization of components mounted on remotely adjustable girders and the use of beam-finder wires (BFW) will satisfy placement tolerances. Girder movement due to ground motion and temperature changes will be monitored continuously by an alignment monitoring system (ADS) and remotely corrected. This stabilization of components as well as the monitoring and correction of the electron beam trajectory based on BPMs and correctors will increase the time between BBA applications. Undulator segments will be periodically removed from the undulator Hall and measured to monitor radiation damage and other effects that might degrade undulator tuning

  13. Contribution to the ATLAS B-field 3D model

    International Nuclear Information System (INIS)

    Vorozhtsov, S.B.; Titkova, I.V.; Nessi, M.

    1996-01-01

    The results from the simplified Tile-Cal B-field models calculations are presented. The effects of glue gaps, end plates, front plates, laminated iron layer near girder, 2 mm iron layers between tiles have been estimated. An interpretation of the existing field measurements of the TileCal segments is fulfilled. Some proposals for the general ATLAS B-field map calculation are given. 12 refs., 10 figs

  14. Effect of cooling water on stability of NLC linac components

    Energy Technology Data Exchange (ETDEWEB)

    F. Le Pimpec et al.

    2003-02-11

    Vertical vibration of linac components (accelerating structures, girders and quadrupoles) in the NLC has been studied experimentally and analytically. Effects such as structural resonances and vibration caused by cooling water both in accelerating structures and quadrupoles have been considered. Experimental data has been compared with analytical predictions and simulations using ANSYS. A design, incorporating the proper decoupling of structure vibrations from the linac quadrupoles, is being pursued.

  15. Effect of Cooling Water on Stability of NLC Linac Components

    Energy Technology Data Exchange (ETDEWEB)

    Le Pimpec, Frederic

    2002-11-01

    Vertical vibration of linac components (accelerating structures, girders and quadrupoles) in the NLC has been studied experimentally and analytically. Effects such as structural resonances and vibration caused by cooling water both in accelerating structures and quadrupoles have been considered. Experimental data has been compared with analytical predictions and simulations using ANSYS. A design, incorporating the proper decoupling of structure vibrations from the linac quadrupoles, is being pursued.

  16. Gelžbetoninių kelio plokščių gamybos technologija

    OpenAIRE

    Kyguolis, Kęstas

    2016-01-01

    Construction Master Degree final work - reinforced concrete road slabs production technology, manufacturing its track panels, analysis. The building of the construction of the regulatory and legislative conditions. Describe the architectural and structural static structure. Calculate the steel girder. Carried concrete track slab production technological and organizational analysis. The graphical part contains the static structural scheme, the main sections of the site plan, production of tech...

  17. Vibrational Stability of NLC Linac and Final Focus Components

    Energy Technology Data Exchange (ETDEWEB)

    Le Pimpec, Frederic

    2002-09-25

    Vertical vibration of linac components (accelerating structures, girders and quadrupoles) in the NLC has been studied experimentally and analytically. Effects such as structural resonances and vibration caused by cooling water both in accelerating structure and quadrupoles have been considered. Experimental data has been compared with analytical predictions and simulations using ANSYS. Design to properly decouple the structure vibrations from the linac quadrupoles is being pursued.

  18. Computer analysis of the thermomechanical structure behavior. The CEASEMT system. The TEDEL code

    International Nuclear Information System (INIS)

    Hoffmann, A.; Jeanpierre, Francoise.

    1976-01-01

    TEDEL is intended for the elastoplastic computation of pipes and three-dimensional mechanical structures. Structures are described by means of jointed girder elements or more complex elements as for pipings: bended pipes, right angle elbows, tees, or any elements whose strength parameters are given to TEDEL. TEDEL is also for the dynamic computation of structures, damping included. A TEDEL option is for computing buckling critical load [fr

  19. Critical traffic loading for the design of prestressed concrete bridge

    International Nuclear Information System (INIS)

    Hassan, M.I.U.

    2009-01-01

    A study has been carried out to determine critical traffic loadings for the design of bridge superstructures. The prestressed concrete girder bridge already constructed in Lahore is selected for the analysis as an example. Standard traffic loadings according to AASHTO (American Association of State Highway and Transportation Officials) and Pakistan Highway Standards are used for this purpose. These include (1) HL-93 Truck, (2) Lane and (3) Tandem Loadings in addition to (4) Military tank loading, (5) Class-A, (6) Class-B and (7) Class-AA loading, (8) NLC (National Logistic Cell) and (9) Volvo truck loadings. Bridge superstructure including transom beam is analyzed Using ASD and LRFD (Load and Resistance Factor Design) provisions of AASHTO specifications. For the analysis, two longer and shorter spans are selected. This includes the analysis of bridge deck; interior and exterior girder; a typical transom beam and a pier. Dead and live loading determination is carried out using both computer aided and manual calculations. Evaluation of traffic loadings is done for all the bridge components to find out the critical loading. HL-93 loading comes out to be the most critical loading and where this loading is not critical in case of bridge decks; a factor of 1.15 is introduced to make it equivalent with HL-93 -Ioading. SAP-2000 (Structural Engineering Services of Pakistan) and MS-Excel is employed for analysis of bridge superstructure subjected to this loading. Internal forces are obtained for the structural elements of the bridge for all traffic loadings mentioned. It is concluded that HL-93 loading can be used for the design of prestressed concrete girder bridge. Bridge design authorities like NHA (National Highway Authority) and different cities development authorities are using different standard traffic loadings. A number of suggestions are made from the results of the research work related to traffic loadings and method of design. These recommendations may be

  20. Remote Performance Monitoring of a Thermoplastic Composite Bridge at Camp Mackall, NC

    Science.gov (United States)

    2011-11-01

    supply air tempera- ture, solar radiation, fan speed, blower currents, ac on/off, refrigerant pressures, Lime-to-comfort • Brakes -line pressure, pedal ...into position using angle bracing was in- stalled to provide the reference surface for the girder deflection measure- ments at the midspan of span 3...an excitation voltage is applied to both sensors, the output voltage is directly proportional to the wind speed and vane angle , respectively. The

  1. Life cycle uses of concrete for more sustainable construction

    Energy Technology Data Exchange (ETDEWEB)

    Horvath, A. [Univ. of California, Berkeley, CA (United States). Dept. of Civil and Environmental Engineering

    2001-07-01

    This paper examined ways in which the environmental burdens of construction in general and concrete production in particular can be reduced. Aggregates for concrete production include sand, gravel and stone. They account for most (80 per cent) of the materials used in the United States. This paper argued that given the fact that environmental concerns are an important social issue, the issue of natural resource conservation should be addressed. Some of the life-cycle assessments and comparative design issues associated with concrete construction were summarized. The author presented the example that often the initial cost of a new pavement application may indicate a lower environmental impact than an equivalent design when asphalt is used over reinforced concrete. However, annualized impacts may result in comparable environmental assessments. The same is true for bridge girders, reinforced concrete also seems to be a better environmental choice than steel. This paper also described end-of-life options that involve the use of waste products and recycled products in concrete and other materials to reduce the overall environmental impacts of a product or facility. This paper was divided into several sections entitled: life cycle assessments; life cycle inventory assessment of concretes and asphalt pavements; and, life cycle inventory assessment of concrete and steel bridge girders. 16 refs., 4 tabs.

  2. Behaviour of Steel Fibre Reinforced Rubberized Continuous Deep Beams

    Science.gov (United States)

    Sandeep, MS; Nagarajan, Praveen; Shashikala, A. P.

    2018-03-01

    Transfer girders and pier caps, which are in fact deep beams, are critical structural elements present in high-rise buildings and bridges respectively. During an earthquake, failure of lifeline structures like bridges and critical structural members like transfer girders will result in severe catastrophes. Ductility is the key factor that influences the resistance of any structural member against seismic action. Structural members cast using materials having higher ductility will possess higher seismic resistance. Previous research shows that concrete having rubber particles (rubcrete) possess better ductility and low density in comparison to ordinary concrete. The main hindrance to the use of rubcrete is the reduction in compressive and tensile strength of concrete due to the presence of rubber. If these undesirable properties of rubcrete can be controlled, a new cementitious composite with better ductility, seismic performance and economy can be developed. A combination of rubber particles and steel fibre has the potential to reduce the undesirable effect of rubcrete. In this paper, the effect of rubber particles and steel fibre in the behaviour of two-span continuous deep beams is studied experimentally. Based on the results, optimum proportions of steel fibre and rubber particles for getting good ductile behaviour with less reduction in collapse load is found out.

  3. Engineering survey planning for the alignment of a particle accelerator: part II. Design of a reference network and measurement strategy

    Science.gov (United States)

    Junqueira Leão, Rodrigo; Raffaelo Baldo, Crhistian; Collucci da Costa Reis, Maria Luisa; Alves Trabanco, Jorge Luiz

    2018-03-01

    The building blocks of particle accelerators are magnets responsible for keeping beams of charged particles at a desired trajectory. Magnets are commonly grouped in support structures named girders, which are mounted on vertical and horizontal stages. The performance of this type of machine is highly dependent on the relative alignment between its main components. The length of particle accelerators ranges from small machines to large-scale national or international facilities, with typical lengths of hundreds of meters to a few kilometers. This relatively large volume together with micrometric positioning tolerances make the alignment activity a classical large-scale dimensional metrology problem. The alignment concept relies on networks of fixed monuments installed on the building structure to which all accelerator components are referred. In this work, the Sirius accelerator is taken as a case study, and an alignment network is optimized via computational methods in terms of geometry, densification, and surveying procedure. Laser trackers are employed to guide the installation and measure the girders’ positions, using the optimized network as a reference and applying the metric developed in part I of this paper. Simulations demonstrate the feasibility of aligning the 220 girders of the Sirius synchrotron to better than 0.080 mm, at a coverage probability of 95%.

  4. Damage Detection for Continuous Bridge Based on Static-Dynamic Condensation and Extended Kalman Filtering

    Directory of Open Access Journals (Sweden)

    Haoxiang He

    2014-01-01

    Full Text Available As an effective and classical method about physical parameter identification, extended Kalman filtering (EKF algorithm is widely used in structural damage identification, but the equations and solutions for the structure with bending deformation are not established based on EKF. The degrees of freedom about rotation can be eliminated by the static condensation method, and the dynamic condensation method considering Rayleigh damping is proposed in order to establish the equivalent and simplified modal based on complex finite element model such as continuous girder bridge. According to the requirement of bridge inspection and health monitoring, the online and convenient damage detection method based on EKF is presented. The impact excitation can be generated only on one location by one hammer actuator, and the signal in free vibration is analyzed. The deficiency that the complex excitation information is needed based on the traditional method is overcome. As a numerical example, a three-span continuous girder bridge is simulated, and the corresponding stiffness, the damage location and degree, and the damping parameter are identified accurately. It is verified that the method is suitable for the dynamic signal with high noise-signal ratio; the convergence speed is fast and this method is feasible for application.

  5. Assessment of the transportation route of oversize and excessive loads in relation to the load-bearing capacity of existing bridges

    Science.gov (United States)

    Doležel, Jiří; Novák, Drahomír; Petrů, Jan

    2017-09-01

    Transportation routes of oversize and excessive loads are currently planned in relation to ensure the transit of a vehicle through critical points on the road. Critical points are level-intersection of roads, bridges etc. This article presents a comprehensive procedure to determine a reliability and a load-bearing capacity level of the existing bridges on highways and roads using the advanced methods of reliability analysis based on simulation techniques of Monte Carlo type in combination with nonlinear finite element method analysis. The safety index is considered as a main criterion of the reliability level of the existing construction structures and the index is described in current structural design standards, e.g. ISO and Eurocode. An example of a single-span slab bridge made of precast prestressed concrete girders of the 60 year current time and its load bearing capacity is set for the ultimate limit state and serviceability limit state. The structure’s design load capacity was estimated by the full probability nonlinear MKP analysis using a simulation technique Latin Hypercube Sampling (LHS). Load-bearing capacity values based on a fully probabilistic analysis are compared with the load-bearing capacity levels which were estimated by deterministic methods of a critical section of the most loaded girders.

  6. Structure-borne noise of railway composite bridge: Numerical simulation and experimental validation

    Science.gov (United States)

    Li, Xiaozhen; Liu, Quanmin; Pei, Shiling; Song, Lizhong; Zhang, Xun

    2015-09-01

    In order to investigate the characteristics of the noise from steel-concrete composite bridges under high-speed train loading, a model used to predict the bridge-borne noise is established and validated through a field experiment. The numerical model for noise prediction is developed based on the combination of spatial train-track-bridge coupled vibration theory and Statistical Energy Analysis (SEA). Firstly, train-track-bridge coupled vibration is adopted to obtain the velocity time history of the bridge deck vibration. Then, the velocity time history is transferred into frequency domain through FFT to serve as the vibratory energy of SEA deck subsystems. Finally, the transmission of the vibratory energy is obtained by solving the energy balance equations of SEA, and the sound radiation is computed using the vibro-acoustic theory. The numerically computed noise level is verified by a field measurement. It is determined that the dominant frequency of steel-concrete composite bridge-borne noise is 20-1000 Hz. The noise from the bottom flange of steel longitudinal girder is less than other components in the whole frequency bands, while the noise from web of steel longitudinal girder is dominant in high frequency range above 315 Hz. The noise from concrete deck dominates in low-frequency domain ranges from 80 Hz to 160 Hz.

  7. Design and construction of Ogawa bridge; Ogawa bashi no sekkei to seko

    Energy Technology Data Exchange (ETDEWEB)

    Hori, T.; Chigira, F. [Kajima Corp., Tokyo (Japan); Sakao, H.

    1995-09-30

    Ogawa bridge 230m long by 15.5m wide has been planned on the national road No.401 at Katashina-mura in Gunma Prefecture. Structure mode is two spans continuous PC cable-stayed obliquely system, and a main tower is H type (height: 56m from the road surface) and is located at the center of the bridge alone. This place corresponding to the entrance of Oze famous national park, the main tower is designed so as to have bulge, imaging Mizubasho (lysichiton camtschatcense), from the middle part of the pier to the lower part of the main tower. Arrangement of the cables is designed as two faces of hung fun type and one side face is composed of 13 steel strands (dia. 15.2mm wire x 27 (partly 19); covered with PE tube) in front and rear respectively. A main girder is the box type PC block 2.3m height by 4m or 3m long, and 3m long one is for fastening with a cable. Centering on the main tower, the girder blocks are successively connected in front and rare alternatively and are fastened with cables in part. This overhanging connection work is carried out by two special movable conveyers `Wagens`. 26 figs., 2 tabs.

  8. Bridge and steel structures. History and vision on bridge erection; Kyoryo kokozobutsu. Kasetsu gijutsu no shorai

    Energy Technology Data Exchange (ETDEWEB)

    Mukai, S.; Hayashi, T. [Sumitomo Heavy Industries, Ltd., Tokyo (Japan)

    1998-08-20

    This paper describes the progress of bridge erection technology. It introduces the results of cable erection, rotated/extruded erection, and cantilever erection. The cable erection is a multi point suspension erection using cables. For the rotated/extruded erection, the monolithic construction is conducted on a working yard set in a right angle to the construction position, and the horizontal beams of the bridge piers (corbel girders) are constructed by the rotated method using a slewing base incorporated around the bridge piers at one side. For the construction of stiffening girders of Innoshima-ohashi Bridge of Honshu-Shikoku Joint Bridge in 1978, trussed face bar blocks were extruded from the main tower in order using a travel crane. For the suspension bridges and cable stayed bridges, main towers were erected using various types of cranes. The erection of Tamashima-ohashi Bridge with a weight of 500 ton using an offshore floating crane is introduced as a large block method. Analysis methods and measurement techniques at the site are used in order to analyze the shape in each step under the erection and to ensure the accurate final complete shape. Reduction of the construction cost, improvement of erection technology, and technology development for large-scale projects are subjects in the future. 22 refs., 8 figs., 1 tab.

  9. Design and construction of the Natorigawa Bridge; Natorigawa kyoryo no sekkei/seko

    Energy Technology Data Exchange (ETDEWEB)

    Murai, Y.; Oba, M.; Omurata, Y. [JR East Japan Railway Co., Tokyo (Japan); Miyauchi, M.; Iwasaki, I. [Taisei Corp., Tokyo (Japan)

    1997-03-31

    The Natorigawa Bridge is reconstructed. Out of the reconstruction work, a report is made mainly on the design of the superstructure work of the PC panel-stayed bridge and the details of the work. In selecting bridge type, PC simple through beam bridge, steel trussed bridge, PC cable-stayed bridge, and PC panel-stayed bridge are compared, and a 2-span continuous PC panel-stayed bridge is adopted. Its appearance resembles that of the cable-stayed bridge, but the structure resembles a girder bridge. The appropriate span length is the intermediate range between those of the girder bridge and the cable-stayed bridge. Its trafficability is excellent with little deformation by the running of trains because the main beam, diagonal panel, and the main tower are connected rigidly to provide high rigidity of the entire bridge. PRC structure is employed in consideration of the restriction to beam height and economical efficiency. Analyses by a FEM model using two dimensional plane elements and by a few plane frame models as well as comparison of sectional force are performed for this bridge, and a proper plane model is selected. Substructure work, superstructure work and measurement work are described. 3 refs., 16 figs., 6 tabs.

  10. Dynamic Analysis of Cable-Stayed Bridges Affected by Accidental Failure Mechanisms under Moving Loads

    Directory of Open Access Journals (Sweden)

    Fabrizio Greco

    2013-01-01

    Full Text Available The dynamic behavior of cable-stayed bridges subjected to moving loads and affected by an accidental failure in the cable suspension system is investigated. The main aim of the paper is to quantify, numerically, the dynamic amplification factors of typical kinematic and stress design variables, by means of a parametric study developed in terms of the structural characteristics of the bridge components. The bridge formulation is developed by using a geometric nonlinear formulation, in which the effects of local vibrations of the stays and of large displacements in the girder and the pylons are taken into account. Explicit time dependent damage laws, reproducing the failure mechanism in the cable system, are considered to investigate the influence of the failure mode characteristics on the dynamic bridge behavior. The analysis focuses attention on the influence of the inertial characteristics of the moving loads, by accounting coupling effects arising from the interaction between girder and moving system. Sensitivity analyses of typical design bridge variables are proposed. In particular, the effects produced by the moving system characteristics, the tower typologies, and the failure mode characteristics involved in the cable system are investigated by means of comparisons between damaged and undamaged bridge configurations.

  11. Construction of the Usui bridge. Chodai PC shachokyo no kensetsu (Joshin'etsu jidoshado Usuikyo)

    Energy Technology Data Exchange (ETDEWEB)

    Otani, S.; Ogata, T. (Japan Highway Public Corp., Tokyo (Japan))

    1993-10-01

    The Usui Bridge is a long bridge located at the Usui mountain pass on the Joshinetsu Expressway, completed in March 1993. This paper reports from its planning to the design, construction work, and construction management. The bridge is a first two-span continuous prestressed concrete cable-stayed bridge (with a length of 222 m) with one central cable plane ever constructed as a highway bridge in Japan. Its bridge construction features are represented by the main girder consisted of three-chamber type box girder, and the main tower of reversed Y-letter concrete structure. For the fan-shaped stay cable (9-step double cable), a large capacity cable of non-grouting type fabricated at a factory (with a tensile strength of 1500 tf class) was used to simplify the installation work at the site. The one-plane structure utilizing the center belt as a stay cable fixing portion was adopted because of its economic performance superior to a two-plane structure, easiness in consolidating construction works, and assurance of more open space for car traffic. After the completion, the bridge construction has been awarded with the Tanaka Prize of Japan Society of Civil Engineers and the PC Technology Association prize. 26 figs., 4 tabs.

  12. Design and construction of the Daini-Chikumagawa bridge; Dai ni Chikumagawa kyoryo no sekkei to seko

    Energy Technology Data Exchange (ETDEWEB)

    Inaba, N.; Takasusuki, K.; Hirasawa, T.; Kanamori, M.

    1996-01-30

    The Daini-Chikumagawa bridge, having spans of 134m {times} 2 which is the largest in Japan as the concrete railroad, is a prestressed concrete (PC) oblique cable-stayed bridge building on the Hokuriku Shinkansen express line which is constructing towards Nagano Olympic (Feb.1998). Regarding adoption of the oblique cable-stayed bridge for the railroad bridge, there are very few examples on a global scale and in Japan besides this bridge there is only one example (Omoto bridge (Iwate pref.), span = 85m). One H type tower (H = 65m from the surface of bridge) is erected at the center of the Chikuma river and then main girders are built at the front and rear of this tower. These main girders, being separated into 5m {times} 24 blocks per one side excepting surroundings of the tower, are fabricated as a three room box type PC block (total width 12.8m; height 3.0m) each on the river beach near the spot. These blocks are jointed from the tower side by the overhanging work using the constructing vehicles and are fixed with oblique materials (cables; two face hanging system) at intervals of 10m. 4 refs., 16 figs., 5 tabs.

  13. Research on Collapse Process of Cable-Stayed Bridges under Strong Seismic Excitations

    Directory of Open Access Journals (Sweden)

    Xuewei Wang

    2017-01-01

    Full Text Available In order to present the collapse process and failure mechanism of long-span cable-stayed bridges under strong seismic excitations, a rail-cum-road steel truss cable-stayed bridge was selected as engineering background, the collapse failure numerical model of the cable-stayed bridge was established based on the explicit dynamic finite element method (FEM, and the whole collapse process of the cable-stayed bridge was analyzed and studied with three different seismic waves acted in the horizontal longitudinal direction, respectively. It can be found from the numerical simulation analysis that the whole collapse failure process and failure modes of the cable-stayed bridge under three different seismic waves are similar. Furthermore, the piers and the main pylons are critical components contributing to the collapse of the cable-stayed bridge structure. However, the cables and the main girder are damaged owing to the failure of piers and main pylons during the whole structure collapse process, so the failure of cable and main girder components is not the main reason for the collapse of cable-stayed bridge. The analysis results can provide theoretical basis for collapse resistance design and the determination of critical damage components of long-span highway and railway cable-stayed bridges in the research of seismic vulnerability analysis.

  14. Tunnel - history of

    International Nuclear Information System (INIS)

    1998-11-01

    This book introduces history of tunnel in ancient times, the middle ages and modern times, survey of tunnel and classification of bedrock like environment survey of position, survey of the ground, design of tunnel on basic thing of the design, and design of tunnel of bedrock, analysis of stability of tunnel and application of the data, construction of tunnel like lattice girder and steel fiber reinforced shot crete, and maintenance control and repair of tunnel.

  15. Thermal changes of the environment and their influence on reinforced concrete structures

    Science.gov (United States)

    Fojtik, R.; Cajka, R.

    2018-04-01

    The thermal expansion of concrete elements concerns both monolithic and prefabricated structures. Inappropriate design of dilation segments may cause minor but even larger failures. Critical environment factors are temperature-changing operations, such as unheated underground garages, where temperature fluctuations may occur depending on the exterior conditions. This paper numerically and experimentally analyses the thermal deformation of selected girders in the underground garages and the consequent structure failures, their causes, possible prevention and appropriate remediation.

  16. Comparative study of trusses to determine the influence of the geometry in the structural efficiency, according to the directions of the principal stresses

    OpenAIRE

    Señís López, Roger; Brufau Niubó, Roberto; Sastre Sastre, Ramon; Carbajal Navarro, Eusebio Carlos

    2015-01-01

    This study compares flat lattice girders mounted on two supports, based on various design parameters, to determine which have better structural performance and what geometries are more efficient. The fundamental goal is to determine the relationship of performance and structural behavior of each type of framework structure, with respect to the principle of optimization and improvement in the efficiency of the trusses if their geometry adapts to the directions of the principal s...

  17. Lamb Wave Polarization Techniques for Structural Damage Localization and Quantification

    Science.gov (United States)

    2011-11-01

    11  Figure 11. Images showing (a) fatigued aluminum dog bone specimen with 53-mm crack and (b) 3-D SLDV test...Abaqus* and a 3-D model of a plate girder. Experimental measurements using piezoelectric ( PZT ) sensors were located on the web in pulse-echo mode, and...analyzed mode conversion of T- joint with collocated PZT sensors before and after the stiffener using a 2-D simulation under plane strain assumptions

  18. Accelerating structure of the CERN new 50 MeV linac

    International Nuclear Information System (INIS)

    Warner, D.J.

    1976-01-01

    The design of the post-coupled Alvarez structure is presented with emphasis on features which are novel and critical especially as regards acceleration of high currents (150 mA) to 50 MeV. Among topics treated are the sequence of computational techniques leading from unit cell (e.m. field) calculations to dynamics of the complete linac, and model measurements which justify the drift-tube girder support approach and our particular post-coupler arrangement. (author)

  19. Open-source web-enabled data management, analyses, and visualization of very large data in geosciences using Jupyter, Apache Spark, and community tools

    Science.gov (United States)

    Chaudhary, A.

    2017-12-01

    Current simulation models and sensors are producing high-resolution, high-velocity data in geosciences domain. Knowledge discovery from these complex and large size datasets require tools that are capable of handling very large data and providing interactive data analytics features to researchers. To this end, Kitware and its collaborators are producing open-source tools GeoNotebook, GeoJS, Gaia, and Minerva for geosciences that are using hardware accelerated graphics and advancements in parallel and distributed processing (Celery and Apache Spark) and can be loosely coupled to solve real-world use-cases. GeoNotebook (https://github.com/OpenGeoscience/geonotebook) is co-developed by Kitware and NASA-Ames and is an extension to the Jupyter Notebook. It provides interactive visualization and python-based analysis of geospatial data and depending the backend (KTile or GeoPySpark) can handle data sizes of Hundreds of Gigabytes to Terabytes. GeoNotebook uses GeoJS (https://github.com/OpenGeoscience/geojs) to render very large geospatial data on the map using WebGL and Canvas2D API. GeoJS is more than just a GIS library as users can create scientific plots such as vector and contour and can embed InfoVis plots using D3.js. GeoJS aims for high-performance visualization and interactive data exploration of scientific and geospatial location aware datasets and supports features such as Point, Line, Polygon, and advanced features such as Pixelmap, Contour, Heatmap, and Choropleth. Our another open-source tool Minerva ((https://github.com/kitware/minerva) is a geospatial application that is built on top of open-source web-based data management system Girder (https://github.com/girder/girder) which provides an ability to access data from HDFS or Amazon S3 buckets and provides capabilities to perform visualization and analyses on geosciences data in a web environment using GDAL and GeoPandas wrapped in a unified API provided by Gaia (https

  20. End region detailing of pretensioned concrete bridge girders : [summary].

    Science.gov (United States)

    2013-03-01

    Introduction of the Florida-I Beam (FIB) in 2009 renewed interest in prestressed concrete beam design, especially end region details. In this study, University of Florida researchers examined construction detailing at the FIB end region.

  1. Seismic vulnerability assessment of a continuous steel box girder ...

    Indian Academy of Sciences (India)

    Tae-Hyung Lee

    2018-02-07

    Feb 7, 2018 ... nonlinear time history analysis is the most widely used and the most reliable method ... the damage probability for the non-isolated bridge is larger than those of the isolated .... [17] and are adjusted for a simulated facilitation purpose. ..... function is assumed as a log-normal cumulative distribution function ...

  2. SEISMIC RESISTING PERFORMANCE OF A NEW DOUBLE TUBE HYBRID SYSTEM FOR MULTI-STORY BUILDINGS

    OpenAIRE

    Nasruddin

    2012-01-01

    Investigation on Double Tube Hybrid System (DTHS) through experimental work and analytical study are conducted as a part of the proposal on the seismic design method for Double Tubes Hybrid System (DTHS) for buildings. This structural system comprises Energy Dissipation Structural Walls (EDSW) as the interior tube and Spandrel Wall Frame (SWF) as the exterior tube. EDSW is composed of two reinforced concrete walls linked by steel coupling girders. The RC walls are not anchored to the foundati...

  3. Fatigue Testing of Maglev-Hybrid Box Beam

    Science.gov (United States)

    2009-03-02

    04142009 3. DATES COVERED: (From - To) 23052006-14092008 4. TITLE AND SUBTITLE Fatigue Testing of Maglev -Hybrid Box Beam 5a. CONTRACT NUMBER NA...was previously built under collaboration between Maglev Inc. and Lehigh University. The girder was instrumented with strain gages and LVDT’s to monitor...report March 2,2009 Contract N00014-06-1-0872 Project: Fatigue Testing of Maglev -Hybrid Box Beam Prepared by Dr. J.L. Grenestedt and Dr. R. Sause

  4. Comparative study of trusses to determine the influence of the geometry in the structural efficiency, according to the directions of the principal stresses : Part II

    OpenAIRE

    Señís, Roger; Brufau, Robert; Sastre, Ramón; Carbajal, Eusebio Carlos

    2015-01-01

    Congreso celebrado en la Escuela de Arquitectura de la Universidad de Sevilla desde el 24 hasta el 26 de junio de 2015. This study compares flat lattice girders mounted on two supports, based on various design parameters, to determine which have better structural performance and what geometries are more efficient. The fundamental goal is to determine the relationship of performance and structural behaviour of each type of framework structure, with respect to the principle of optimization a...

  5. Experimental Analysis of Stiffness of the Riveted Steel Railway Bridge Deck Members’ Joints

    Directory of Open Access Journals (Sweden)

    Gocál Jozef

    2014-12-01

    Full Text Available The paper deals with the real behaviour of the riveted steel railway bridge deck members’ connections with respect to their bending stiffness. Attention is paid to the stringer-to-cross beam connection as well as the cross beam-to-main girder connection. The stiffness of the two connections is investigated on the basis of evaluation of the experimentally determined stress response of the observed structural members to the actual traffic load on an existing railway bridge.

  6. Chichibu park bridge, a Japan's longest PC cable suspension bridge that attaches importance to scenery. Keikan wo jushishita Nippon saidai no PC shachokyo 'Chichibu koenkyo'

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    This paper introduces the feature of Chichibu Park Bridge, a Japan's longest PC cable suspension bridge that attaches importance to scenery. The maximum effective span of Chichibu Park Bridge which is a two-span continuous PC cable suspension bridge measures 195 m, that means the center span length is equivalent to about 400 m if converted to a three-span structure. With respect to the design that values the scenic effect, the main tower has relief engravings of stone carving tone using Chichibu Night Festival as a motif disposed around it; lighting up is applied to the main tower to highlight it so that it can be viewed from far away places; and a balcony is built on the center of the bridge. Chichibu Park Bridge has the bridge axial direction stagger with the river flow direction at 45[degree] to reduce water resistance. The tensile force generated at the corbel section according to the main tower reactive force is dealt with reinforced concrete rather than with prestressed concrete. The main tower adopts a two-chamber girder structure as its cross section shape from the view points of rigidity assurance and scenic effect. For construction control, micro computers are used to correct growing change in bend of the main girder due to temperature change and cable tension change. 6 figs., 4 tabs.

  7. Probability Based Evaluation of Vehicular Bridge Load using Weigh-in-Motion Data

    Directory of Open Access Journals (Sweden)

    Widi Nugraha

    2016-02-01

    Full Text Available Load and Resistance Factored Design (LRFD method for designing bridge in Indonesia have been implemented for more than 25 years. LRFD method treating loads and strengths variables as random variables with specific safety factors for different loads and strengths variables type. The nominal loads, load factors, reduction factors, and other criteria for bridge design code can be determined to meet the reliability criteria. Statistical data of weigh-in-motion (WIM vehicular loads measurement in Northern Java highway, Cikampek - Pamanukan, West Java (2011, used in as statistical loads variable. A 25 m simple span bridge with reinforced concrete T-girder is used as a model for structural analysis due to WIM measured and nominal vehicular load based on RSNI T-02-2005, with applied bending moment of girder as the output. The distribution fitting result of applied bending moment due to WIM measured vehicular loads is lognormal. The maximum bending moment due to RSNI T-02-2005 nominal vehicular load is 842.45 kN-m and has probability of exceedance of 5x10-5. It can be concluded, for this study, that the bridge designed using RSNI T-02-2005 is safely designed, since it has reliability index, β of 5.02, higher than target reliability, β ranging from 3.50 or 3.72.

  8. Vertical vibration control system for PC cable-stayed bridge during cantilever construction; Shuketa jogedo seishin sochi ni yoru haridashi sekoji no PC shachokyo no seishin

    Energy Technology Data Exchange (ETDEWEB)

    Oshio, M.; Nakano, R.; Niihara, Y.; Yano, K.; Takeda, T. [Kajima Corp., Tokyo (Japan)

    1995-12-20

    A PC cable-stayed bridge under extension construction having long span length may have long-cycle vibration generated because of wind. The vibration puts workers working on main girders into a state of seasick causing the workability to drop. Therefore, with an objective to reduce vibration occurring on the main girders during construction, discussions were given on application of an active type vertical vibration absorbing device. The vibration absorbing device is an active system that a weight is driven vertically by a hydraulic actuator. The device was developed with a target that damping ratio when a maximum extension is 120 m becomes three times that when no vibration is absorbed for a 5-span continuous PC cable-stayed bridge with a length of 675 m, a central span of 260 m, and a width of 11 m. A cage housing the weight is connected with the actuator at its top by using pins, and the weight is supported being suspended from the top of the actuator. Vibration is absorbed by utilizing reactive force generated when the weight is driven vertically by the hydraulic actuator. The hydraulic actuator contains a gas spring that supports the dead weight of the weight. Experiments have verified the effectiveness of the vertical vibration absorbing device. 4 refs., 12 figs., 3 tabs.

  9. Determination method of optimum pre-stress in cables of cable-stayed bridges by using fuzzy sets theory; Fuzzy riron wo mochiita shachokyo cable no saiteki prestress chikara ketteiho

    Energy Technology Data Exchange (ETDEWEB)

    Furuta, H. [Kansai Univ., Osaka (Japan); Kaneyoshi, M.; Tanaka, H. [Hitachi Zosen Corp., Osaka (Japan); Kamei, M.

    1996-06-20

    Generally in cable-stayed bridges, optimum pre-stress is introduced into cables to achieve reducing weight of the cable cross section by reducing and equalizing the cross sectional force of the main girders. However, the conventional optimum stress determining methods require setting the cross section to be repeated. Therefore, in order to omit iterative calculations and derive rational pre-stress, a fuzzy sets theory was introduced. With this method, if upper and lower limits of design values (targeted design values) are inputted, which are desired by a designer to be realized as cross sectional force such as in main girders and towers and cable tension, an optimum stress can be derived automatically by means of a fuzzy linearity regression analysis. The targeted design values are given by experience and engineering judgment, and resetting the cross section is not required as long as a target value which can be tolerated by a hypothetical cross section is given. Since the theory used is a fuzzy sets theory, the derived pre-stress may not be guaranteed as a truly optimum pre-stress. In order to have the result approach an optimum solution, it is important to set adequate upper and lower limits of the targeted design values referring to examples of constructions in the past and experience. 10 refs., 11 figs., 7 tabs.

  10. Erection of the Meiko-Central bridge; Meiko chuo ohashi no kasetsu

    Energy Technology Data Exchange (ETDEWEB)

    Kaneda, S.; Nishikawa, K.; Nagai, Y.; Ishihara, S.; Tsunekawa, M.; Yoshino, S. [Kawasaki Heavy Industries, Ltd., Kobe (Japan)

    1997-10-20

    This is a 1170m-long triple-span continuous steel cable-stayed bridge with the central span measuring 590m, built to traverse Nagoya Port as part of the Isewangan highway. The 190m-high main towers are A-shaped, and have an octagonal cross section to stay stable against winds. The joints were designed to be welded mainly on the spot so as not to affect the surrounding landscape, and in this welding process the achievement of prescribed accuracy was the important technological task. The main girder was a 37m-wide multi-chamber/single-box type, and the steel stabs were installed by on-site welding. Since the erection was carried out above the ship course, a method was used in which the main girder was hung over with the cable stretched long, which demanded constant prudence to assure accuracy throughout the work. The cable is a 17-stage 2-face multi-fan type, a semi-parallel wire strand coated with polyethylene and white fluoroethylene resin. As for accuracy management for erection, it was accomplished by adjusting the amount of shim introduced into each of the four cables every time one stage of cable was erected for the side span and central span. Every accuracy management requirement met the target value with an adequate margin. 6 refs., 10 figs., 4 tabs.

  11. North RTL ''grid scan'' studies

    International Nuclear Information System (INIS)

    Emma, P.

    1990-01-01

    This study was made in response to screen measurements which indicated an emittance growth of nearly a factor of two within the North RTL or linac girder-1. Betatron oscillations are induced at the beginning of the North RTL to search for gross geometric aberrations arising within the RTL or sector-2 of the linac. The oscillations are induced horizontally and vertically with two X or two Y dipole correctors stepped in a nested loop fashion. In both cases the full set of RTL and first girder sector-2 linac beam position monitors (BPMs) are sampled in X and Y for each corrector setting. Horizontal (or vertical) data from pairs of BPMs are then transformed to phase space coordinates by the linear transformation constructed assuming the transport optics between the BPMs is known. A second transformation is then made to normalized phase space coordinates by using Twiss parameters consistent with the assumed transport optics. By careful choice of initial Twiss parameters the initial grid can be made square for convenience in graphical interpretation. A linear ''grid'' is then fitted to the transformed data points for each pair of BPMs. The area of each grid is calculated and linearity qualitatively evaluated. Furthermore, although not the focus of this study, the beta match at each BPM can be quantified. 6 figs

  12. Translations on Eastern Europe, Political, Sociological and Military Affairs, Number 1579

    Science.gov (United States)

    1978-08-23

    front of the bridge abutments . The weight-volume ratio was so selected that the rail girders and the road- way or track plates would float in the...respect to the required posi- tion. 2-3 Abutment with Highway Connection ThP abutment , in its silkiest form, consists of a railroad tie stack; but...it c£ Sso be built up of massive prefabricated parts or locally prepared concrete. A portion of the start-up approach/ and braking forces is di

  13. Survey, alignment, and beam stability at the Advanced Light Source

    International Nuclear Information System (INIS)

    Krebs, G.F.

    1997-10-01

    This paper describes survey and alignment at the Lawrence Berkeley Laboratories Advanced Light Source (ALS) accelerators from 1993 to 1997. The ALS is a third generation light source requiring magnet alignment to within 150 microns. To accomplish this, a network of monuments was established and maintained. Monthly elevation surveys show the movement of the floor over time. Inclinometers have recently been employed to give real time information about magnet, vacuum tank and magnet girder motion in the ALS storage ring

  14. Estimation of Curvature Changes for Steel-Concrete Composite Bridge Using Fiber Bragg Grating Sensors

    OpenAIRE

    Kang, Donghoon; Chung, Wonseok

    2013-01-01

    This study is focused on the verification of the key idea of a newly developed steel-concrete composite bridge. The key idea of the proposed bridge is to reduce the design moment by applying vertical prestressing force to steel girders, so that a moment distribution of a continuous span bridge is formed in a simple span bridge. For the verification of the key technology, curvature changes of the bridge should be monitored sequentially at every construction stage. A pair of multiplexed FBG sen...

  15. Fabrication of mesoscopic floating Si wires by introducing dislocations

    International Nuclear Information System (INIS)

    Motohashi, Mitsuya; Shimizu, Kazuya; Niwa, Masaaki; Suzuki, Toshiaki

    2014-01-01

    We fabricated a mesoscopic Si wire by introducing dislocations in a silicon wafer before HF anodization. The dislocations formed along the (111) crystal plane. The outline of the dislocation line was an inverted triangle. The resulting wire floated on a bridge girder and had a hybrid structure consisting of a porous layer and crystalline Si. The cross section of the wire had an inverted triangle shape. The wire formation mechanism is discussed in terms of carrier transport, crystal structure, and dislocation formation during anodization. (paper)

  16. Fabrication of mesoscopic floating Si wires by introducing dislocations

    Science.gov (United States)

    Motohashi, Mitsuya; Shimizu, Kazuya; Suzuki, Toshiaki; Niwa, Masaaki

    2014-12-01

    We fabricated a mesoscopic Si wire by introducing dislocations in a silicon wafer before HF anodization. The dislocations formed along the (111) crystal plane. The outline of the dislocation line was an inverted triangle. The resulting wire floated on a bridge girder and had a hybrid structure consisting of a porous layer and crystalline Si. The cross section of the wire had an inverted triangle shape. The wire formation mechanism is discussed in terms of carrier transport, crystal structure, and dislocation formation during anodization.

  17. Iglesia de San Bernardo, Munich

    Directory of Open Access Journals (Sweden)

    Haindl, Friederich F.

    1963-06-01

    Full Text Available In plan form this church has the shape of an irregular pentagon. The external walls are in brick and are crowned by a reinforced encircling concrete polygonal hoop. The surfaces of the walls are faced both on the outside and internally. The roof consists of metal girders resting at the convergence of the walls on the concrete encircling girder. Timber trellice joists join these girders. Inside, the maximum height of the ceiling is 25 ms, and the continuity of the walls is broken by prefabricated panels carrying glazing, which provides suitable daylight illumination. The roof structure is lined with wood, to give it an interior shape reminiscent of a large tent. The benches for the congregation are arranged in four groups round the altar. The vicarage is older than the church structure, and is built on the same level. There is also a large church hall, suitable for a variety of functions allied to the chapel. Slightly linked with the church body is a 37 ms high tower. The whole design is outstanding because of its clear organic relationship of forms and volumes.La iglesia es una construcción central, cuya planta adopta la forma de un pentágono irregular Los muros exteriores son de fábrica de ladrillo y están coronados por un zuncho de atado de hormigón armado. Sus paramentos van enfoscados tanto por dentro como por fuera. La cubierta está constituida a base de vigas metálicas que se entregan en las esquinas —sobre el zuncho de hormigón—, entre las que se acoplan vigas de celosía, de madera. El interior, cuya máxima altura de techo es 25 m, nos muestra sus paredes interrumpidas por paneles prefabricados de hormigón, acristalados, coa objeto de conseguir una adecuada iluminación. El techo va revestido con madera formando como tienda de campaña. Los bancos están colocados en cuatro grupos alrededor del altar. Más antigua, y al mismo nivel de la iglesia, se halla la casa parroquial, y un gran salón para diferentes actividades

  18. Steel bridges structural health monitoring based on operational modal analysis accommodating evaluation of uncertainty

    Directory of Open Access Journals (Sweden)

    Saeid Jahan

    2017-11-01

    Full Text Available Structural damage detection is based on that the dynamic response of structure will change because of damage. Hence, it is possible to estimate the location and severity of damage leads to changes in the dynamic response before and after the damage. In this study, the genetic fuzzy system has been used for bridge structural health monitoring. A key objective of using genetic algorithms is to automate the design of fuzzy systems. This method is used for damage detection of a single span railway bridge with steel girders and a concrete bridge. For studying damage detection, the numerical models of these two bridges are built with the measured dynamic characteristics. A three-dimensional finite element model and a single two-dimensional girders model of the bridge have been constructed to study usefulness of the genetic fuzzy system for damage detection and the effectiveness of modeling. After analysis to control the uncertainties, the measured frequencies are contaminated with some noise and the effect of that on the achievement of damage detection method is evaluated. The present study has shown that the natural frequency has appropriate sensitivity to different damage scenarios in the structure. In addition, the natural frequency in comparison with other modal parameters, is less affected by random noise. Increasing the number of measurement modes and using torsional modes, will lead to an accurate damage diagnosis even in symmetrical structures.

  19. Design and construction of superstructure in prestressed concrete cable-stayed bridge. ; Aomori Bay Bridge. PC shachokyo jobuko no sekkei to seko. ; Aomori Bay Bridge

    Energy Technology Data Exchange (ETDEWEB)

    Ishibashi, T.; Fujimori, S.; Oba, M.; Tsuyoshi, T. (East Japan Railway Co., Tokyo (Japan))

    1991-12-01

    Aomori Bay Bridge is a 1,219m long elevated bridge, a part of No.2 Bay Highway of 1,993m in total length crossing over Aomori railway station which was planned in ordecr to integrate the port facilities of Aomori Harbor and expedite cargo traffic smoothly. Of this Bay Bridge, its main bridge portion crossing over Aomori railway station and the sea area was planned as a continuous prestressed concrete cable-stayed bridge of 498m in total length and consisting of three portions including the central portion in which the main span between the central bridge piers was 240m. It is scheduled to open in the summer of 1992. With regard to the design of this bridge, special care for the view of the bridge has been taken covering from the structure style to the accessories. For this bridge, a large scale underground continuous wall solid base with a box-shaped section consisting of 6 chambers was adopted for the base of a main tower. It has the cantilever suspension structure of the wide girder with the inverted Y-shaped pylons. For its stav cable, was adopted a large capacity stay cable with standard tensile strength of 1,942 fabricated on the site and for its covering tube, a FRP tube was adopted. In this article, the construction of the main girder and stay cables, and the construction control during their installation by projection are reported. 7 refs., 14 figs., 9 tabs.

  20. Planning and design of the Ikedako bride (temporary name); Ikedakokyo (kasho) no keikaku to sekkei

    Energy Technology Data Exchange (ETDEWEB)

    Mochizuki, H.; Iizuka, Y.; Yukawa, Y. [Japan Highway Public Corporation, Tokyo (Japan)

    1997-09-30

    This paper describes the planning and design of the Ikeda-Lake Bridge of the Tokushima Express Way. This bridge is a PC (prestressed concrete) five-span continuous balanced arch bridge with a length 705 m. This bridge transverses prefectural road, Ikeda Dam Lake of Yoshino River, park, JR line, national highway, and town road, and both ends of the bridge are tunnels, resulting in the complicated bridging condition. Various bridging methods were examined from the viewpoint of structural characteristics, workability, profitability, maintenance/management, and aspect. A bridge with PC stiffening girders was adopted. The maximum interval between supports is 200 m. This bridge has the largest scale as a concrete arch bridge in Japan. Basements of bridge piers were constructed by pneumatic caisson method and large-diameter deep basement method. Since basements were located in the dam lake and they were quickly constructed in a short period in a non-flood season, steel caissons were separately fabricated in the dock, towed and placed for excavation. For the construction of upper section, overhang method was adopted using movable working vehicle. For the construction of arch section, the arch was overhung simultaneously in the both sides by composing the truss using stiffened girders, arch ribs, vertical members, and temporary cable stayed members, which was the first in Japan. In 1997, basement construction was completed, and construction of bridge piers and a part of the construction of upper section have been started. 2 refs., 12 figs.

  1. Nonlinear Analysis of External Prestressed Reinforced Concrete Beams with BFRP and CFRP

    Directory of Open Access Journals (Sweden)

    Haleem K. Hussain

    2017-05-01

    Full Text Available The traditional strengthening methods for concrete structure (girders, beams, columns…. consuming time and could be an economical, a new modern repair methods using the Carbon Fiber Reinforced Polymers (CFRP and Basalt Fiber Reinforced Polymer (BFRP as a laminate strips or bars,and considered a competitive solution that will increase the life-cycle of repaired structures. This study investigated the strengthen reinforced concrete girder. Nonlinear analysis have been adopted to the models using FEM analysis (ANSYS to simulate the theoretical results compared with experimental results.Using finite element packages, more efficient and better analyses can be made to fully understand the response of individual structural components and their contribution to a structure as a whole.Three type of material are used in this study as an external prestressed wire (steel, CFRP and BFRP. The prestressed beam is modeled as simply supported beam with two concentrated point load. The results showed that all tested strengthening beam increased the load carryingcapacity of the beams depend on prestressing force. Obtained Result was compared for different type of beam.This study also was enlarged to include using CFRP and BFRPbarwhich are light weight and moredurable, lead to ease of handling and maintenance. The research conducted analytical work to evaluate the effectiveness of concrete beams reinforced normally by the use of CFRP and BFRP bars. The results showed a significant gain in the beam’s ultimate capacities using CFRP bars comparing with beam reinforced with BFRP bar and reference beam

  2. Instrument to determine prestress remaining in a damaged bridge girder

    Science.gov (United States)

    Civjan, Scott A.; Jirsa, James O.; Carrasquillo, Ramon L.; Fowler, David W.

    1998-03-01

    An instrument has been developed to estimate stress levels in prestress strands in existing members. The prototype instrument applies a lateral load to an exposed prestressing strand and measures the resulting displacements. The instrument was calibrated for 0.5-inch (12.7 mm) diameter seven-wire strand with exposed lengths of 1.5 feet (0.46 m) to 3.75 feet (1.14 m). It was tested to determine its accuracy, precision, and usefulness in the field. Strand forces were consistently estimated to within ten percent of the actual load. The device was also utilized in the placement of strand splices and was found to be more reliable in checking induced strand tensions than the standard torque wrench method.

  3. Acoustic emission techniques applied to conventionally reinforced concrete bridge girders.

    Science.gov (United States)

    2008-09-01

    Reinforced concrete (RC) bridges generally operate at service-level loads except during discrete overload events that can reduce the integrity of the structure by initiating concrete cracks, widening or extending of existing concrete cracks, as well ...

  4. Application of Engineered Cementitious Composites (ECC) in modular floor panels

    DEFF Research Database (Denmark)

    Lárusson, Lárus Helgi; Fischer, Gregor; Jönsson, Jeppe

    2008-01-01

    This paper describes the design, manufacturing, and structural behavior of a prefabricated floor panel consisting of a modular assembly of a thin-walled ECC slab and steel truss girders. The features of this composite structure include light weight, the modular manufacturing process...... concept introduced in this paper aims at improvements in the manufacturing process of the panels by casting the ECC slab separately and subsequently joining it with the steel trusses. The focus of this paper is on design and manufacturing of a prototype modular panel and on its structural behavior under...

  5. Load and Global Response of Ships

    DEFF Research Database (Denmark)

    Jensen, Jørgen Juncher

    The present monograph covers wave load and global structural response for ships. It is primary written as a textbook for students with an introductionary background in naval architecture and a basic knowledge of statistics and strength of materials. The subjects are treated in details starting from...... first principles. The aim has been to derive and present the necessary theoretical framework for predicting the extreme loads and the corresponding hull girder stresses the ship may be subjected to during its operational lifetime.Although some account is given to reliabiity analysis, the present...

  6. Support systems for faces and workings (Le soutenement des tailles ou chantiers d'exploitation)

    Energy Technology Data Exchange (ETDEWEB)

    Stassen, P

    1978-01-01

    Various support systems for use in underground mining are discussed, these include: A. Props: wooden props, steel props and yielding props. B. Roofbars: wooden bars, solid steel bars, steel link bars, steel flange bars, cruciform steel bars. C. Chocks: working conditions, timber release chocks, steel-girder chocks, mechanical chocks and chock-type supports. D. Powered supports: classification of powered support systems, the parameters which have to be considered when selecting the right type of powered support, minimal load- bearing requirement for powered supports, characteristic features of some powered-support system. (10 refs.) (In French)

  7. The Plastic Tension Field Method

    DEFF Research Database (Denmark)

    Hansen, Thomas

    2005-01-01

    This paper describes a calculation method for steel plate girders with transverse web stiffeners subjected to shear. It may be used for predicting the failure load or, as a design method, to determine the optimal amount of internal web stiffeners. The new method is called the plastic tension field...... method. The method is based on the theory of plasticity and is analogous to the so-called diagonal compression field method developed for reinforced concrete beams with transverse stirrups, which is adopted in the common European concrete code (Eurocode 2). Many other theories have been developed...

  8. Puentes de carretera de montaña, Inglaterra

    Directory of Open Access Journals (Sweden)

    Rendel, Palmer y Tritton, Ingenieros

    1965-03-01

    Full Text Available The new layout of the road between Hirwaun and Abergavenny, in the Welsh district known as «Heads of the Valleys», has involved the construction of four new bridges, which because of the difficult terrain, were very carefully designed before the best solution could be discovered. Traditional methods would have required the use of much scaffolding and tall supports, owing to the depth of the gorges to be traversed. Hence progressive cantilevering from either side of the span was chosen. In three of the four bridges the final method was the one mentioned above. In the other, a treble portal frame, resting on two intermediate slender supports, hinged at their base, was preferred. The first three bridges are all of very similar construction: in each case an initial mass at the springer was concreted, to which additional sections, each 3 m long, were added, and attached by means of prestressed reinforcement. The fourth bridge was built with double T girders, cantilevered in 3 m sections. The 3 m spaces between the chords of parallel girders were concreted at the site. A set of four of these girders, and the slabs between the chords, constitute a box girders, and the depth of this structure decreases from 4.50 ms over the supports to 1.50 m at the crown. The mixed system of prefabricated units, and slabs, concreted at the site, was made possible because of the prestressing.La reforma del trazado de la carretera entre Hirwaun y Abergavenny, en la zona denominada «Heads of the Valleys», ha motivado la construcción de cuatro nuevos puentes que, por su situación y por lo accidentado del terreno, fueron objeto de particular estudio a fin de lograr una solución óptima. La adopción de métodos tradicionales exigía el empleo de grandes cimbras y soportes por la profundidad de las depresiones salvadas. Por ello se recurrió a los sistemas de construcción en voladizos. La solución definitiva fue, pues, de arco en voladizo, en tres de los cuatro

  9. Phase II investigation of the response of columns to short duration loadings: scaling report. Mark I Program, Task 3.2.1. Teledyne report TR-2488(e)

    International Nuclear Information System (INIS)

    1978-03-01

    Phase II of a two-phase column testing program which will determine short-term load capacities for the Mark I containment columns is now under way. The scaling report is submitted to outline the scaling procedures and also to present the scaled quantities such as geometry, load eccentricity, and load time duration. Dimensional analysis and similarity techniques were applied to the experimental models to obtain a set of twelve scaling laws. These scaling laws provide a rational basis for modeling the columns. The scaling laws give nondimensional relationships which are common to both the model and prototype. Parameters which are known to be important in column buckling and which were found to be important during Phase I testing were used as the independent variables in the scaling laws. Column specimens for Phase II testing have been designed to be representative of the prototype columns. Combined bending and compression are characteristic of the Mark I columns with the maximum moment applied at the column-ring girder junction. The experimental columns reflect these characteristics, even though special fixtures and equipment will be required to perform the tests. The column specimens include the scaled rotational stiffness of the ring girder as well as the boundary condition of the pinned or sliding end. To properly incorporate the effects of residual stress, the models will be constructed from ''off-the-shelf', carbon steel pipe and rolled sections, and built-up sections will be fabricated from standard plate. The column geometries scale almost exactly, even though ''replica'' modeling was not used

  10. Stochastic Extreme Load Predictions for Marine Structures

    DEFF Research Database (Denmark)

    Jensen, Jørgen Juncher

    1999-01-01

    Development of rational design criteria for marine structures requires reliable estimates for the maximum wave-induced loads the structure may encounter during its operational lifetime. The paper discusses various methods for extreme value predictions taking into account the non-linearity of the ......Development of rational design criteria for marine structures requires reliable estimates for the maximum wave-induced loads the structure may encounter during its operational lifetime. The paper discusses various methods for extreme value predictions taking into account the non......-linearity of the waves and the response. As example the wave-induced bending moment in the ship hull girder is considered....

  11. Discrete vortex method simulations of aerodynamic admittance in bridge aerodynamics

    DEFF Research Database (Denmark)

    Rasmussen, Johannes Tophøj; Hejlesen, Mads Mølholm; Larsen, Allan

    , and to determine aerodynamic forces and the corresponding flutter limit. A simulation of the three-dimensional bridge responseto turbulent wind is carried out by quasi steady theory by modelling the bridge girder as a line like structure [2], applying the aerodynamic load coefficients found from the current version......The meshless and remeshed Discrete Vortex Method (DVM) has been widely used in academia and by the industry to model two-dimensional flow around bluff bodies. The implementation “DVMFLOW” [1] is used by the bridge design company COWI to determine and visualise the flow field around bridge sections...

  12. Estimation of metallic structure durability for a known law of stress variation

    Science.gov (United States)

    Mironov, V. I.; Lukashuk, O. A.; Ogorelkov, D. A.

    2017-12-01

    Overload of machines working in transient operational modes leads to such stresses in their bearing metallic structures that considerably exceed the endurance limit. The estimation of fatigue damages based on linear summation offers a more accurate prediction in terms of machine durability. The paper presents an alternative approach to the estimation of the factors of the cyclic degradation of a material. Free damped vibrations of the bridge girder of an overhead crane, which follow a known logarithmical decrement, are studied. It is shown that taking into account cyclic degradation substantially decreases the durability estimated for a product.

  13. Darlington GS vacuum building - containment shell

    International Nuclear Information System (INIS)

    Huterer, J.; Ha, E.C.; Brown, D.G.; Cheng, P.C.

    1985-01-01

    The paper describes the consequences of new design requirements for the Darlington vacuum building on its structural configuration, analytical and reinforcing steel layout. Attention focuses on the ring girder where the juncture of dome and perimeter wall produces a complex post-tensioning layout, and attendant difficulties in design and construction. At the wall base, full fixity imposes large local stresses. Long-term, shrinkage and creep, and temperature effects become significant. A research program and in-house analytical procedure established time-dependent concrete behaviour and corresponding wall-sectional stresses. The outcome is examined in terms of reinforcement, temperature controls, and wall liner requirements. (orig.)

  14. Post-buckling capacity of bi-axially loaded rectangular steel plates

    DEFF Research Database (Denmark)

    Jönsson, Jeppe; Bondum, T. H.

    2012-01-01

    slenderness and edge displacement ratio are included in the investigations presented. Capacity interaction curves are established in the bi-axial stress domain. It turns out that for certain stress ratios the imperfections dominating the ultimate capacity are not affine to the lowest classical buckling mode...... for biaxial stress. It is of great interest that short wave imperfections of a lower magnitude compared to conventionally used imperfections are seen to lower the capacity of the bi-axially loaded plates. The topic is of major concern in the flange plates of long span bridges with multi box girder...

  15. Sprayed concrete linings

    Energy Technology Data Exchange (ETDEWEB)

    Hindle, D.

    1999-12-01

    Sprayed concrete, or shotcrete, was invented in the 1920s for preserving dinosaur skeletons and was used underground initially in coalmines for the preservation and fine proofing of timber supports. Its use as a support lining in rock tunnelling was developed in the 1950s and 60s. The article surveys equipment available from major manufacturers and suppliers of concrete spraying equipment (Aliva, Cifa, GIA, Industri, Ingersoll Rand, etc.), specialist cement and additive manufacturers (Castle, Cement, Moria Carbotech). manufacturers of lattice girders and fibre reinforcement, and manufacturers of instrumentation for tunnel linings. 5 tabs., 9 photos.

  16. Fault-Tolerant Onboard Monitoring and Decision Support Systems

    DEFF Research Database (Denmark)

    Lajic, Zoran

    a crude and simple estimation of the actual sea state (Hs and Tz), information about the longitudinal hull girder loading, seakeeping performance of the ship, and decision support on how to operate the ship within acceptable limits. The system is able to identify critical forthcoming events and to give...... advice regarding speed and course changes to decrease the wave-induced loads. The SeaSense system is based on the combined use of a mathematical model and measurements from a set of sensors. The overall dependability of a shipboard monitoring and decision support system such as the SeaSense system can...

  17. Numerical analysis of beam with sinusoidally corrugated webs

    Science.gov (United States)

    Górecki, Marcin; Pieńko, Michał; Łagoda, GraŻyna

    2018-01-01

    The paper presents numerical tests results of the steel beam with sinusoidally corrugated web, which were performed in the Autodesk Algor Simulation Professional 2010. The analysis was preceded by laboratory tests including the beam's work under the influence of the four point bending as well as the study of material characteristics. Significant web's thickness and use of tools available in the software allowed to analyze the behavior of the plate girder as beam, and also to observe the occurrence of stresses in the characteristic element - the corrugated web. The stress distribution observed on the both web's surfaces was analyzed.

  18. Wind tunnel experiments on unstable self-excited vibration of sectional girders

    Czech Academy of Sciences Publication Activity Database

    Král, Radomil; Pospíšil, Stanislav; Náprstek, Jiří

    2014-01-01

    Roč. 44, January (2014), s. 235-250 ISSN 0889-9746 R&D Projects: GA ČR(CZ) GA103/09/0094; GA AV ČR(CZ) IAA200710902; GA MŠk(CZ) ED1.1.00/02.0060 Institutional support: RVO:68378297 Keywords : flutter derivatives * aeroelastic response * frequency ratio tuning * stability domain * initial disturbance Subject RIV: JM - Building Engineering Impact factor: 2.021, year: 2014 http://www.sciencedirect.com/science/article/pii/S0889974613002466

  19. Development of a smart timber bridge girder with fiber optic sensors

    Science.gov (United States)

    James Wacker; Ursula Deza; Brent M. Phares; Terry J. Wipf

    2010-01-01

    Past timber bridge evaluation and maintenance efforts in the USA have principally focused on the internal integrity of timber components using various non-destructive evaluation tools to supplement visual inspection data. This project is part of a comprehensive effort to develop smart structure concepts for improving the long-term performance, maintenance, and...

  20. Safety guidelines of ultimate hull girder strength for grounded container ships

    DEFF Research Database (Denmark)

    Kim, Do Kyun; Pedersen, Preben Terndrup; Paik, Jeom Kee

    2013-01-01

    Various accidents commonly occur on operating ships. The structural damage caused by such accidents is often accompanied by casualties and serious pollution. In this regard, an accidental risk-based approach that is in line with the Goal Based Standard (GBS) of the International Maritime Organiza...

  1. The fatigue behaviour of the breathing webs of steel bridge girders

    Czech Academy of Sciences Publication Activity Database

    Škaloud, Miroslav; Zörnerová, Marie

    2005-01-01

    Roč. 11, č. 4 (2005), s. 323-336 ISSN 1392-3730 R&D Projects: GA ČR(CZ) GA103/05/2059 Institutional research plan: CEZ:AV0Z20710524 Keywords : repeated loads * fatigue crack * S-N curves Subject RIV: JM - Building Engineering

  2. FRCM and FRP composites for the repair of damaged PC girders.

    Science.gov (United States)

    2015-01-01

    Fabric-reinforced-cementitious-matrix (FRCM) and fiber-reinforced polymer (FRP) composites have : emerged as novel strengthening technologies. FRCM is a composite material consisting of a sequence of : one or more layers of cement-based matrix reinfo...

  3. Evaluation of continuity detail for precast prestressed girders : research project capsule.

    Science.gov (United States)

    2008-03-01

    The construction of a new bridge : crossing the Mississippi River north of : Baton Rouge is currently underway. The : project, named the John James : Audubon Bridge, is a true landmark. Its : main span will be the longest cablestayed : bridge in Nort...

  4. Beam-based alignment of CLIC drive beam decelerator using girders movers

    CERN Document Server

    Sterbini, G

    2011-01-01

    The CLIC drive beams will provide the rf power to accelerate the colliding beams: in order to reach the design performance, an efficient transport of the drive beam has to be ensured in spite of its challenging energy spread and large current intensity. As shown in previous studies, the specifications can be met by coupling a convenient optics design with the state-of-the-art of pre-alignment and beambased alignment techniques. In this paper we consider a novel beam-based alignment scheme that does not require quadrupole movers or dipole correctors but uses the motors already foreseen for the pre-alignment system. This implies potential savings in terms of complexity and cost at the expense of the alignment flexibility: the performance, limitations and sensitivity to pre-alignment tolerances of this method are discussed.

  5. Environmental impact assessment and eco-friendly decision-making in civil structures.

    Science.gov (United States)

    Kim, Sang-Hyo; Choi, Moon-Seock; Mha, Ho-Seong; Joung, Jung-Yeun

    2013-09-15

    This study develops two useful procedures in performing an environmental-impact assessment. One is the advanced life-cycle assessment (LCA) method, which effectively tracks the flow of materials and considers the recycling and demolition of a civil structure. The other is an eco-friendly decision-making procedure, which may effectively apply when determining the prototype of a civil structure. The advanced LCA method differs from traditional LCA procedure, as it classifies the input material prior to the impact assessment. Classification work is performed to establish independent life-cycle stages for each material. The processes of recycling and demolition are appropriately added to the life-cycle stages. The impact assessment is performed separately for the materials, and results are aggregated at the end of the analysis. The eco-friendly decision-making procedure enables designers to choose an economical, and environmentally friendly, alternative during the planning phase of the construction project. This procedure rationally amalgamates economical value and environmental effects into a single indicator. The life cycle cost (LCC) of a structure can be analysed by using conventional LCC tools, whereas the environmental impact is estimated by LCA. The results from LCC and LCA are then integrated by using either a CO2 conversion method or an analytical hierarchy process (AHP). The CO2 conversion method presents the result as a monetary value, whereas the AHP presents the result as a non-dimensional value. A practical example using a steel box girder bridge and a pre-stressed concrete (PSC) box-girder bridge is also given in order to aid the understanding of the presented procedure. Copyright © 2013 Elsevier Ltd. All rights reserved.

  6. Increased of the capacity integral bridge with reinforced concrete beams for single span

    Science.gov (United States)

    Setiati, N. Retno

    2017-11-01

    Sinapeul Bridge that was built in 2012 in Sumedang is a bridge type using a full integral system. The prototype of integral bridge with reinforced concrete girder and single span 20 meters until this year had decreased capacity. The bridge was conducted monitoring of strain that occurs in the abutment in 2014. Monitoring results show that based on the data recorded, the maximum strain occurs at the abutment on the location of the integration of the girder of 10.59 x 10-6 tensile stress of 0.25 MPa (smaller than 150 x 10-6) with 3 MPa tensile stress as limit the occurrence of cracks in concrete. Sinapeul bridge abutment with integral system is still in the intact condition. Deflection of the bridge at the time of load test is 1.31 mm. But this time the bridge has decreased exceeded permission deflection (deflection occurred by 40 mm). Besides that, the slab also suffered destruction. One cause of the destruction of the bridge slab is the load factor. It is necessary for required effort to increase the capacity of the integral bridge with retrofitting. Retrofitting method also aims to restore the capacity of the bridge structure due to deterioration. Retrofitting can be done by shortening of the span or using Fibre Reinforced Polymer (FRC). Based on the results obtained by analysis of that method of retrofitting with Fibre Reinforced Polymer (FRC) is more simple and effective. Retrofitting with FRP can increase the capacity of the shear and bending moment becomes 41% of the existing bridge. Retrofitting with FRP method does not change the integral system on the bridge Sinapeul become conventional bridges.

  7. Case study of soil-structure interaction for nuclear power plants

    International Nuclear Information System (INIS)

    Lee, A.J.H.

    1975-01-01

    The dynamic response of a turbine pedestal foundation was analyzed for earthquake and emergency unbalanced loadings in view of satisfactory machine performance and safety consideration. A method of studying the soil-structure interaction effect on such response aiming directly toward a realistic design of the pedestal and also the foundation mat is described. The method utilized the concept underlying the fundation spring approach. Unlike the conventional ones, this concrete pedestal complex has its stiffness and stability provided by shear walls, rib plates, girders and horizontal diaphrams. This necessitated the use of a three-dimensional finite element model as an original mathematical static model consisting of line, surface and solid elements. The mat was also modeled as a flexible mat. For soil-structure interaction effect the foundation compliance functions were represented by frequency independent soil springs distributed at the nodes of the mat, oriented in the global axes. For accurate springs, in magnitude and distribution, for the irregular shape of the mat considered, another finite element model was constructed to simulate a rigid disc (with the true shape) resting on the elastic half-space. The static model was then reduced to a dynamic model containing only those degrees of freedom sufficient to reflect significant response of the complex and its components. For the flexible slab and spring distribution used, the present soil-structure model allowed a better prediction of responses not only at floor elevations where major structural components intersect but also at the interior points of floors and walls where amplification in high frequency response is important. With the method outlined, realistic dynamic responses of the girders which support the machine bearing were studied in detail

  8. Tests on conducted electrical noise on a storage ring dc-dc converter cabinet

    International Nuclear Information System (INIS)

    Carwardine, J.J.

    1994-01-01

    Electrical noise is produced by switching transients in the power supply converters which excite resonances formed by stray capacitance and cable inductance. This noise is present not only on the load cables, but also on ground cables of the magnet and of the converter cabinet. Since there will eventually be a large number of cabinets running at one time, tests were carried out to characterize the noise and to investigate possible techniques for reducing the levels. The tests were carried out on the test girder and converter cabinet set up in 412 area. There were four magnets installed on the girder -- two 0.5m quadrupoles, a 0.8m quadrupole, and a sextupole. These tests were carried out on one of the 0.5m quadrupoles. It should be noted that with this setup, the raw dc power was supplied at around 70V. In the final configuration, a 0.5m quad will be fed from a 40V raw supply. Consequently, the switching transients observed during the tests are likely to be higher than will occur in reality. Noise currents contain two main components: a low frequency component at around 50kHz, and a higher frequency component at around lMHz. It is the latter component which is of primary concern. Currents measured on the dc load cables typically were around one ampere, while currents into the building ground system were only a few tens of milliamps. Several methods were used to try reducing the noise currents, but only the addition of a series impedance was successful -- other methods either had no effect or increased the ground currents

  9. Evaluation of Dynamic Characteristics of the Footbridge with Integral Abutments

    Science.gov (United States)

    Pańtak, Marek; Jarek, Bogusław

    2017-09-01

    The paper presents the results of dynamic field tests and numerical analysis of the footbridge designed as a three-span composite structure with integral abutments. The adopted design solution which has allowed to achieve a high resistance of the structure to dynamic loads and to meet the requirements of the criteria of comfort of use with a large reserve has been characterized. For comparative purposes, numerical analyzes of three construction variants of the footbridge were presented: F-1 - construction with integral abutments (realized variant), F-2 - construction with girders anchored in the abutments by means of tension rocker bearings, F-3 - construction with concrete side spans.

  10. Improved design of large wind turbine blades of fibre composites (Phase 2) - Summary Report

    DEFF Research Database (Denmark)

    Sørensen, Bent F.; Branner, K.; Stang, H.

    2005-01-01

    girder section subjected to transverse forces was investigated experimentally and by modelling. Buckling-driven delamination of planar specimens was studied on experimentally and by modelling. A novel approachwas proposed for the determination of mixed mode cohesive laws for large-scale crack bridging...... problems. The normal and shear stresses of the cohesive laws were obtained from data of the fracture resistance and the normal and tangential displacements ofthe cohesive zone. Delamination of a thin layer bonded to an elastic substrate close to corners and edges was also analysed. Results for the shape...... of the interface crack front and critical stress for steady-state delamination were obtained....

  11. Evaluation of Dynamic Characteristics of the Footbridge with Integral Abutments

    Directory of Open Access Journals (Sweden)

    Pańtak Marek

    2017-09-01

    Full Text Available The paper presents the results of dynamic field tests and numerical analysis of the footbridge designed as a three-span composite structure with integral abutments. The adopted design solution which has allowed to achieve a high resistance of the structure to dynamic loads and to meet the requirements of the criteria of comfort of use with a large reserve has been characterized. For comparative purposes, numerical analyzes of three construction variants of the footbridge were presented: F-1 - construction with integral abutments (realized variant, F-2 - construction with girders anchored in the abutments by means of tension rocker bearings, F-3 - construction with concrete side spans.

  12. Puente en la autopista de Worblen

    Directory of Open Access Journals (Sweden)

    Kipfer, Paul

    1963-06-01

    Full Text Available The Swiss roadway from Berne to Zurich crosses the Worblen river over a prestressed concrete structure which rests on the slopes of a railway embankment. The structure has five spans, of 40.1, 48.5, 60.6 and 52 ms length respectively, in the direction Berne to Zurich. In the horizontal projection the deck is curved, and consists of two hollow continuous box girders, with prestressed partitions. It rests on open columns which reach down to bedrock, after penetrating through a layer of clay of scant consistency. The fact that the structure rests on a slope, the poor soil conditions and the depth at which firm foundations are situated has led to difficulties, to overcome which detailed study has been necessary. Statically, the structure behaves as a totally elastic girder, since no permanent deformations take place. On loading the 21 ms wide deck (which is divided into two runways, each 8.40 ms wide, and two sidewalks on one of its sides, the box girder on the opposite side takes up between 20 and 30 % of the moment due to the loading. A number of tests on scale models have been done, and these have agreed with the initial design calculations.La autopista suiza de Berna a Zurich cruza el valle del Worblen sobre una estructura de hormigón pretensado que se apoya a media ladera en el terraplén de una línea ferroviaria. La estructura tiene cinco tramos, de 40,10; 48,5; 48,5; 60,60, y 52 m de luz, respectivamente, en el sentido direccional de Berna a, Zurich. El tablero, con eje en curva, está constituido por dos nervios huecos o vigas cajón, continuos, con tabiques pretensados, soportados por apoyos aligerados que descienden hasta un banco rocoso después de atravesar una capa arcillosa poco consistente. La particularidad de apoyarse sobre un terraplén, las malas condiciones del terreno y la profundidad del firme han ocasionado problemas cuya solución ha requerido serios estudios. La obra se comporta estáticamente como si se tratase de una

  13. Quality control and in-service inspection technology for hybrid-composite girder bridges.

    Science.gov (United States)

    2014-08-01

    This report describes efforts to develop quality control tools and in-service inspection technologies for the fabrication and construction of Hybrid Composite Beams (HCBs). HCBs are a new bridge technology currently being evaluated by the Missouri De...

  14. Implementation of a Refined Shear Rating Methodology for Prestressed Concrete Girder Bridges

    Science.gov (United States)

    2017-12-01

    Lower than desirable shear ratings at the ends of prestressed concrete beams have been the topic of ongoing research between MnDOT and the University of Minnesota. A recent study by the University of Minnesota entitled Investigation of Shear Distribu...

  15. Influence of Pavement on Fatigue Performance of Urban Steel Box Girder Deck

    Directory of Open Access Journals (Sweden)

    Zheng Zhongyue

    2016-01-01

    Full Text Available Based on spatial finite element analysis method, the Influence of pavement on fatigue performance of orthotropic steel deck was analyzed in terms of pavement system, asphalt pavement stiffness. The result shows that compared with asphalt pavement system, RPC pavement system can not only obviously improve the stress condition of steel bridge deck, but also significantly extend the fatigue life of steel bridge panel; Increasing the stiffness of pavement layer can obviously reduce the stress amplitude of fatigue details, especially for direct contact with the pavement.

  16. Acoustic emission techniques applied to conventionally reinforced concrete bridge girders : final report.

    Science.gov (United States)

    2008-09-01

    Reinforced concrete (RC) bridges generally operate at service-level loads except during discrete overload events that can reduce the integrity of the structure by initiating concrete cracks, widening or extending of existing concrete cracks, as well ...

  17. Investigation of long-term prestress losses in pretensioned high performance concrete girders.

    Science.gov (United States)

    2005-01-01

    Effective determination of long-term prestress losses is important in the design of prestressed concrete bridges. Over-predicting prestress losses results in an overly conservative design for service load stresses, and under-predicting prestress loss...

  18. Strain features and condition assessment of orthotropic steel deck cable-supported bridges subjected to vehicle loads by using dense FBG strain sensors

    Science.gov (United States)

    Wei, Shiyin; Zhang, Zhaohui; Li, Shunlong; Li, Hui

    2017-10-01

    Strain is a direct indicator of structural safety. Therefore, strain sensors have been used in most structural health monitoring systems for bridges. However, until now, the investigation of strain response has been insufficient. This paper conducts a comprehensive study of the strain features of the U ribs and transverse diaphragm on an orthotropic steel deck and proposes a statistical paradigm for crack detection based on the features of vehicle-induced strain response by using the densely distributed optic fibre Bragg grating (FBG) strain sensors. The local feature of strain under vehicle load is highlighted, which enables the use of measurement data to determine the vehicle loading event and to make a decision regarding the health status of a girder near the strain sensors via technical elimination of the load information. Time-frequency analysis shows that the strain contains three features: the long-term trend item, the short-term trend item, and the instantaneous vehicle-induced item (IVII). The IVII is the wheel-induced strain with a remarkable local feature, and the measured wheel-induced strain is only influenced by the vehicle near the FBG sensor, while other vehicles slightly farther away have no effect on the wheel-induced strain. This causes the local strain series, among the FBG strain sensors in the same transverse locations of different cross-sections, to present similarities in shape to some extent and presents a time delay in successive order along the driving direction. Therefore, the strain series induced by an identical vehicle can be easily tracked and compared by extracting the amplitude and calculating the mutual ratio to eliminate vehicle loading information, leaving the girder information alone. The statistical paradigm for crack detection is finally proposed, and the detection accuracy is then validated by using dense FBG strain sensors on a long-span suspension bridge in China.

  19. Hormigón liviano de alto desempeño - una comparación entre pérdidas de pretensado reales y estimadas por los códigos de diseño High performance lightweight concrete - a comparison between actual prestress losses and design code estimates

    Directory of Open Access Journals (Sweden)

    Mauricio López

    2007-04-01

    Full Text Available Dos mezclas de hormigón liviano de alto desempeño (HLAD con resistencias a compresión de 55 MPa y 69 MPa fueron desarrolladas. El peso unitario de los hormigones fue 1855 y 1890 kg/m, respectivamente. Creep, retracción y pérdidas de pretensado fueron investigadas en 36 probetas cilíndricas y en cuatro vigas pretensadas AASHTO tipo II. Las pérdidas de pretensado medidas en las vigas AASHTO tipo II fabricadas con HLAD fueron menores que las estimadas con los métodos descritos en los códigos AASHTO, PCI y ACI-209, lo que significa que los códigos de diseño dan estimaciónes conservadoras de las pérdidas de pretensado en este nuevo hormigón. Basados en los datos experimentales, las pérdidas finales de pretensado fueron estimadas como un 14.3 y 9.6% de la carga inicial aplicada para las vigas hechas con HLAD de 55 y 69 MPa, respectivamenteTwo different high performance lightweight concretes (HPLC with strengths of 55 and 69 MPa were developed. They had an air-dry unit weight of 1855 and 1890 kg/m³, respectively. Creep, shrinkage and prestress losses were investigated on 36 cylinder specimens and on four AASHTO Type II girders. Prestress losses measured on the AASHTO Type II girders made with HPLC were less than those predicted using AASHTO, PCI and ACI-209 methods which means that the design codes give conservative estimates of the actual prestress losses of this new concrete. Based on experimental data, final, total prestress losses were estimated to be 14.3 and 9.6% of the initial prestressing force for the 55-MPa and 69-MPa HPLC, respectively

  20. Experimental modelling of core debris dispersion from the vault under a PWR pressure vessel. Pt. 2

    International Nuclear Information System (INIS)

    Rose, P.W.

    1987-12-01

    In previous experiments, done on a 1/25 scale model in Perspex of the vault under a PWR pressure vessel, the instrument tubes support structure built into the vault was not included. It consists of a number of grids made up of fairly massive steel girders. These have now been added to the model and experiments performed using water to simulate molten core debris assumed to have fallen on to the vault floor and high-pressure air to simulate the discharge of steam or gas from the assumed breach at the bottom of the pressure vessel. The results show that the tubes support structure considerably reduces the carry-over of liquid via the vault access shafts. (author)

  1. Stress Regression Analysis of Asphalt Concrete Deck Pavement Based on Orthogonal Experimental Design and Interlayer Contact

    Science.gov (United States)

    Wang, Xuntao; Feng, Jianhu; Wang, Hu; Hong, Shidi; Zheng, Supei

    2018-03-01

    A three-dimensional finite element box girder bridge and its asphalt concrete deck pavement were established by ANSYS software, and the interlayer bonding condition of asphalt concrete deck pavement was assumed to be contact bonding condition. Orthogonal experimental design is used to arrange the testing plans of material parameters, and an evaluation of the effect of different material parameters in the mechanical response of asphalt concrete surface layer was conducted by multiple linear regression model and using the results from the finite element analysis. Results indicated that stress regression equations can well predict the stress of the asphalt concrete surface layer, and elastic modulus of waterproof layer has a significant influence on stress values of asphalt concrete surface layer.

  2. Dynamic analysis program for frame structure

    International Nuclear Information System (INIS)

    Ando, Kozo; Chiba, Toshio

    1975-01-01

    A general purpose computer program named ISTRAN/FD (Isub(HI) STRucture ANalysis/Frame structure, Dynamic analysis) has been developed for dynamic analysis of three-dimensional frame structures. This program has functions of free vibration analysis, seismic response analysis, graphic display by plotter and CRT, etc. This paper introduces ISTRAN/FD; examples of its application are shown with various problems : idealization of the cantilever, dynamic analysis of the main tower of the suspension bridge, three-dimensional vibration in the plate girder bridge, seismic response in the boiler steel structure, and dynamic properties of the underground LNG tank. In this last example, solid elements, in addition to beam elements, are especially used for the analysis. (auth.)

  3. Fixing Trailer Hitch for Roof Rack of Cargos

    Directory of Open Access Journals (Sweden)

    Darina Matisková

    2017-02-01

    Full Text Available This article presents a new technical solution of fixing trailer hitch which serves as a connection between single track vehicle and cargo, mainly light trailer. They are manufactured from steel girder and nets which are constructed by point welding. They are designed to indicate the necessary solidity and the required load bearing capacity of the cargo. The application of roof racks is universal and these products are in great demand in the field of game management. There are a lot of trailer hitches which the manufacturers tailor to customers´ demands. The stated technical solution is subject of published industrial utility model at the Industrial property office of the Slovak republic.

  4. Improving Thermal Insulation Properties for Prefabricated Wall Components Made Of Lightweight Aggregate Concrete with Open Structure

    Science.gov (United States)

    Abramski, Marcin

    2017-10-01

    original wall component type. Besides, two improved types of prefabricated wall had built-in steel lattice girders. The failure mode was the same for all the tested components: diagonal cracks occurred on the sides of each component due to their insufficient shear-force-capacity. The span deflection was measured during all the tests by means of LVDTs. Load-carrying capacities obtained in the tests were for all wall structure types similar and much higher (many times) than internal forces (i.e. bending moments and shear forces) calculated for a wind load acting on a typical hall building according to the German codes. An increased amount of EPS (up to 30 per cent in volume) did not influence significantly the wall structural strength. The use of the steel lattice girders caused some technological problems and led to a quality loss of the produced components. The future use of the lattice girders would require a change in the production process: it would have to be more labour consuming.

  5. Modular jack-up platform debuts in Peru's Amazon jungle

    Energy Technology Data Exchange (ETDEWEB)

    Franco, A.

    1975-08-11

    Robishaw Engineering Inc., Houston, has designed and built a jack-up platform based on a modular flotation and erection system that allows exploratory and development drilling year round in any location that cannot be reached by conventional equipment. All components are light enough to be transported by helicopters rated for 4000-lb loads, yet strong and buoyant enough to serve as working platforms. The pile-supported self-elevating drilling platform consists of H-shaped steel girders joined by pin connectors and tension wires. Deck panels are steel-plated. When elevated on steel pilings, the platform can support loads imposed by rigs capable of drilling to 18,000 ft. One such unit is currently being used in the Peruvian rain forest.

  6. Monitoring Bridge Dynamic Responses Using Fiber Bragg Grating Tiltmeters.

    Science.gov (United States)

    Xiao, Feng; Chen, Gang S; Hulsey, J Leroy

    2017-10-20

    In bridge health monitoring, tiltmeters have been used for measuring rotation and curvature; however, their application in dynamic parameter identification has been lacking. This study installed fiber Bragg grating (FBG) tiltmeters on the bearings of a bridge and monitored the dynamic rotational angle. The dynamic features, including natural frequencies and mode shapes, have been identified successfully. The innovation presented in this paper is the first-time use of FBG tiltmeter readings to identify the natural frequencies of a long-span steel girder bridge. The identified results have been verified using a bridge finite element model. This paper introduces a new method for the dynamic monitoring of a bridge using FBG tiltmeters. Limitations and future research directions are also discussed in the conclusion.

  7. Monitoring Bridge Dynamic Responses Using Fiber Bragg Grating Tiltmeters

    Directory of Open Access Journals (Sweden)

    Feng Xiao

    2017-10-01

    Full Text Available In bridge health monitoring, tiltmeters have been used for measuring rotation and curvature; however, their application in dynamic parameter identification has been lacking. This study installed fiber Bragg grating (FBG tiltmeters on the bearings of a bridge and monitored the dynamic rotational angle. The dynamic features, including natural frequencies and mode shapes, have been identified successfully. The innovation presented in this paper is the first-time use of FBG tiltmeter readings to identify the natural frequencies of a long-span steel girder bridge. The identified results have been verified using a bridge finite element model. This paper introduces a new method for the dynamic monitoring of a bridge using FBG tiltmeters. Limitations and future research directions are also discussed in the conclusion.

  8. Discussion on design and stress checking of cast-in-place bracket

    Science.gov (United States)

    Xi, Tang Xian; Yong, He; Hu, Sun Shuan

    2018-04-01

    The cast-in-place bracket is the main support structure in the construction of bridge. Its strength, stiffness and stability have a direct impact on the quality and the safety of bridge construction. The design and calculation of the bracket in the prestressed concrete box girder are analyzed in this paper. The models including Bailey beam, steel crossbeam and steel columns are established by the finite element software. The strength, stiffness and stability of each model under the most unfavorable load are analyzed by MIDAS Civil. The analysis results verify that the support plan meets the relevant specifications and construction requirements. The feasibility of the support scheme was verified well accordingly. The paper can provide reference and guidance for similar engineering construction.

  9. Definition of Availability Index of Deformed Building Constructions Using the Finite - Element Analysis Package

    Science.gov (United States)

    Shutova, M. N.; Skibin, G. M.; Evtushenko, S. I.

    2017-11-01

    The paper is devoted to the problem of definition of availability index of deforming building construction in atypical cases. The authors revealed a real applicability of the finite-elements analyses package, such as ANSYS, for engineering testing calculations of building constructions and determination of the sites of increased stresses. It was determined that stresses increased up to 7.75 times in the sites with mechanical defects (for steel crane girder); also, the authors revealed the convergence of the calculation results between the finite element method and a usual decision using the strength of materials (in the limits 2-14% for steel truss frame). The equivalent stresses don’t exceed the maximum permissible tension for this type of steel. The building constructions have a limited availability index.

  10. Hull Girder Fatigue Damage Estimations of a Large Container Vessel by Spectral Analysis

    DEFF Research Database (Denmark)

    Andersen, Ingrid Marie Vincent; Jensen, Jørgen Juncher

    2013-01-01

    This paper deals with fatigue damage estimation from the analysis of full-scale stress measurements in the hull of a large container vessel (9,400 TEU) covering several months of operation. For onboard decision support and hull monitoring sys-tems, there is a need for a fast reliable method...... for esti-mation of fatigue damage in the ship hull. The objective of the study is to investigate whether the higher frequency contributions from the hydroelastic responses (springing and whipping) can satisfactory be included in the fatigue damage estimation by only a few parameters derived from the stress...

  11. Construction Condition and Damage Monitoring of Post-Tensioned PSC Girders Using Embedded Sensors.

    Science.gov (United States)

    Shin, Kyung-Joon; Lee, Seong-Cheol; Kim, Yun Yong; Kim, Jae-Min; Park, Seunghee; Lee, Hwanwoo

    2017-08-10

    The potential for monitoring the construction of post-tensioned concrete beams and detecting damage to the beams under loading conditions was investigated through an experimental program. First, embedded sensors were investigated that could measure pre-stress from the fabrication process to a failure condition. Four types of sensors were installed on a steel frame, and the applicability and the accuracy of these sensors were tested while pre-stress was applied to a tendon in the steel frame. As a result, a tri-sensor loading plate and a Fiber Bragg Grating (FBG) sensor were selected as possible candidates. With those sensors, two pre-stressed concrete flexural beams were fabricated and tested. The pre-stress of the tendons was monitored during the construction and loading processes. Through the test, it was proven that the variation in thepre-stress had been successfully monitored throughout the construction process. The losses of pre-stress that occurred during a jacking and storage process, even those which occurred inside the concrete, were measured successfully. The results of the loading test showed that tendon stress and strain within the pure span significantly increased, while the stress in areas near the anchors was almost constant. These results prove that FBG sensors installed in a middle section can be used to monitor the strain within, and the damage to pre-stressed concrete beams.

  12. Sustitución del tablero del puente Omaru

    Directory of Open Access Journals (Sweden)

    Sugawara, Misao

    1963-04-01

    Full Text Available The Omaru Bridge, which carries the railway track to the Kyushu Island, in Japan, had a metallic superstructure, and as the bridge is close to the sea, had been subjected to the corrosion effect of sea water. As upkeep expenses were high and such structures suffer rapidly from these corrosion effects, the possibility of substituting these metal girders by prefabricated prestressed structures was investigated. The problem of this particular case is a general one, and the solution adopted in the case of the Omaru Bridge is in the nature of an initial trial, that could be applied more generally, after detail improvements, to other metal structures, where the damage of corrosion is increasingly serious. This paper describes in detail the method of preparing the girders, the technique of substitution, auxiliary equipment, prefabrication, etc.El puente Omaru, sobre el que pasa la línea férrea de la isla Kyushu, del Japón, era de superestructura metálica, y se hallaba sometido a los efectos corrosivos del agua marina, ya que la obra está en las inmediaciones del mar. Como los gastos de conservación son elevados y las estructuras metálicas sufren rápidamente los efectos de la corrosión, se estudió la posibilidad de sustituir las actuales vigas metálicas por otras, prefabricadas, de hormigón pretensado. El problema planteado aquí es general, y la solución adoptada para tal sustitución en el puente de Omaru es como un ensayo previo, con el fin de poderla extender, debidamente perfeccionada, a otras estructuras, también metálicas, en las que la corrosión se deja sentir con intensidad y gravedad crecientes. La preparación de vigas, métodos empleados para la sustitución, tren auxiliar, como material móvil y prefabricación, son objeto de descripción detallada en este trabajo.

  13. Static analysis of the hull plate using the finite element method

    Science.gov (United States)

    Ion, A.

    2015-11-01

    This paper aims at presenting the static analysis for two levels of a container ship's construction as follows: the first level is at the girder / hull plate and the second level is conducted at the entire strength hull of the vessel. This article will describe the work for the static analysis of a hull plate. We shall use the software package ANSYS Mechanical 14.5. The program is run on a computer with four Intel Xeon X5260 CPU processors at 3.33 GHz, 32 GB memory installed. In terms of software, the shared memory parallel version of ANSYS refers to running ANSYS across multiple cores on a SMP system. The distributed memory parallel version of ANSYS (Distributed ANSYS) refers to running ANSYS across multiple processors on SMP systems or DMP systems.

  14. SPEAR 3 Upgrade Project: The Final Year

    International Nuclear Information System (INIS)

    Hettel, R

    2004-01-01

    During April, 2003, the SPEAR 2 storage ring, which served the high energy physics community from 1972 to 1987, and the synchrotron radiation community for an additional 15 years, was removed from its shielding tunnel in order to install the new 3-GeV, 500-mA SPEAR 3 light source. From May to November, SSRL will excavate the tunnel floor and pour a new concrete floor, and then install pre-assembled girders holding magnets, copper vacuum chambers, PEP-II-style rf cavities, and beam line front end components. At the same time, power supply, instrumentation and control, and other ancillary systems will be configured, leading to a commissioning period beginning in November 2003. The progress of accelerator component implementation and installation during the final year of the project will be reviewed

  15. APPLICATION OF ULTRA-HIGH PERFORMANCE CONCRETE TO PEDESTRIAN CABLE-STAYED BRIDGES

    Directory of Open Access Journals (Sweden)

    CHI-DONG LEE

    2013-06-01

    Full Text Available The use of ultra-high performance concrete (UHPC, which enables reducing the cross sectional dimension of the structures due to its high strength, is expected in the construction of the super-long span bridges. Unlike conventional concrete, UHPC experiences less variation of material properties such as creep and drying shrinkage and can reduce uncertainties in predicting time-dependent behavior over the long term. This study describes UHPC’s material characteristics and benefits when applied to super-long span bridges. A UHPC girder pedestrian cable-stayed bridge was designed and successfully constructed. The UHPC reduced the deflections in both the short and long term. The cost analysis demonstrates a highly competitive price for UHPC. This study indicates that UHPC has a strong potential for application in the super-long span bridges.

  16. A scaffold easy to decontaminate

    International Nuclear Information System (INIS)

    Mourek, D.

    1992-01-01

    The conventional scaffold used in the assembling work and in revisions of technological facilities at nuclear power plants has many drawbacks. The most serious of them are a high amount of radioactive waste arising from the decontamination (planing) of the floor timber and from the discarding of damaged irreparable parts, and a considerable corrosion of the carbon steel supporting structure after the decontamination. A detailed description is given of a novel scaffold assembly which can be decontaminated and which exhibits many assets, in particular a good mechanical resistance (also to bad weather), a lower weight, and the use of prepreg floor girders for the construction of service platforms or scaffold bridges which can readily be assembled from the pressed pieces in a modular way. (Z.S.). 4 figs., 4 refs

  17. Parallel scalability and efficiency of vortex particle method for aeroelasticity analysis of bluff bodies

    Science.gov (United States)

    Tolba, Khaled Ibrahim; Morgenthal, Guido

    2018-01-01

    This paper presents an analysis of the scalability and efficiency of a simulation framework based on the vortex particle method. The code is applied for the numerical aerodynamic analysis of line-like structures. The numerical code runs on multicore CPU and GPU architectures using OpenCL framework. The focus of this paper is the analysis of the parallel efficiency and scalability of the method being applied to an engineering test case, specifically the aeroelastic response of a long-span bridge girder at the construction stage. The target is to assess the optimal configuration and the required computer architecture, such that it becomes feasible to efficiently utilise the method within the computational resources available for a regular engineering office. The simulations and the scalability analysis are performed on a regular gaming type computer.

  18. Composite slab behavior and strength analysis under static and dynamic loads

    Directory of Open Access Journals (Sweden)

    Florin Radu HARIGA

    2012-07-01

    Full Text Available Steel-framed buildings are typically constructed using steel-deck-reinforced concrete floor slabs. The in-plane (or diaphragm strength and stiffness of the floor system are frequently utilized in the lateral load-resisting system design. This paper presents the results of an experimental research program in which four full size composite diaphragms were vertically loaded to the limit state, under static or dynamic loads. Two test specimens were provided with longitudinal steel-deck ribs, and the other two specimens with cross steel-deck ribs. Typical composite diaphragm limit states are described, and the controlling limit state for each of the full size tests is indicated. The interaction effects between the reinforced concrete slab and the steel girder on the composite slab strength and stiffness were mainly studied.

  19. Numerical Analysis of Effectiveness of Strengthening Concrete Slab in Tension of the Steel-Concrete Composite Beam Using Pretensioned CFRP Strips

    Directory of Open Access Journals (Sweden)

    Jankowiak Iwona

    2017-12-01

    Full Text Available One of the methods to increase the load carrying capacity of the reinforced concrete (RC structure is its strengthening by using carbon fiber (CFRP strips. There are two methods of strengthening using CFRP strips - passive method and active method. In the passive method a strip is applied to the concrete surface without initial strains, unlike in the active method a strip is initially pretensioned before its application. In the case of a steel-concrete composite beam, strips may be used to strengthen the concrete slab located in the tension zone (in the parts of beams with negative bending moments. The finite element model has been developed and validated by experimental tests to evaluate the strengthening efficiency of the composite girder with pretensioned CFRP strips applied to concrete slab in its tension zone.

  20. Numerical Analysis of Effectiveness of Strengthening Concrete Slab in Tension of the Steel-Concrete Composite Beam Using Pretensioned CFRP Strips

    Science.gov (United States)

    Jankowiak, Iwona; Madaj, Arkadiusz

    2017-12-01

    One of the methods to increase the load carrying capacity of the reinforced concrete (RC) structure is its strengthening by using carbon fiber (CFRP) strips. There are two methods of strengthening using CFRP strips - passive method and active method. In the passive method a strip is applied to the concrete surface without initial strains, unlike in the active method a strip is initially pretensioned before its application. In the case of a steel-concrete composite beam, strips may be used to strengthen the concrete slab located in the tension zone (in the parts of beams with negative bending moments). The finite element model has been developed and validated by experimental tests to evaluate the strengthening efficiency of the composite girder with pretensioned CFRP strips applied to concrete slab in its tension zone.

  1. Effects of errors on the dynamic aperture of the Advanced Photon Source storage ring

    International Nuclear Information System (INIS)

    Bizek, H.; Crosbie, E.; Lessner, E.; Teng, L.; Wirsbinski, J.

    1991-01-01

    The individual tolerance limits for alignment errors and magnet fabrication errors in the 7-GeV Advanced Photon Source storage ring are determined by computer-simulated tracking. Limits are established for dipole strength and roll errors, quadrupole strength and alignment errors, sextupole strength and alignment errors, as well as higher order multipole strengths in dipole and quadrupole magnets. The effects of girder misalignments on the dynamic aperture are also studied. Computer simulations are obtained with the tracking program RACETRACK, with errors introduced from a user-defined Gaussian distribution, truncated at ±5 standard deviation units. For each error, the average and rms spread of the stable amplitudes are determined for ten distinct machines, defined as ten different seeds to the random distribution, and for five distinct initial directions of the tracking particle. 4 refs., 4 figs., 1 tab

  2. Alignment and vibration issues in TeV linear collider design

    International Nuclear Information System (INIS)

    Fischer, G.E.

    1989-07-01

    The next generation of linear colliders will require alignment accuracies and stabilities of component placement at least one, perhaps two, orders of magnitude better than can be achieved by the conventional methods and procedures in practice today. The magnitudes of these component-placement tolerances for current designs of various linear collider subsystems are tabulated. In the micron range, long-term ground motion is sufficiently rapid that on-line reference and mechanical correction systems are called for. Some recent experiences with the upgraded SLAC laser alignment systems and examples of some conceivable solutions for the future are described. The so called ''girder'' problem is discussed in the light of ambient and vibratory disturbances. The importance of the quality of the underlying geology is stressed. The necessity and limitations of public-beam-derived placement information are mentioned. 40 refs., 4 figs., 1 tab

  3. Cubierta con elementos prefabricados de hormigón armado y pretensado, en Villanova de Asti, Italia

    Directory of Open Access Journals (Sweden)

    Nicola, S.

    1969-09-01

    Full Text Available This building is part of an industrial complex, owned by the firm FIRGAT. In spite of its relatively small size, it is notable because of its roof, which rests on normal reinforced concrete pillars. The roofing consists of three kinds of precast elements, some concave, others convex and the main girders. The whole is interconnected in an original manner, following the calculations of engineer Antonio Migliasso.Este edificio constituye parte del complejo industrial de la sociedad FIRGAT y, a pesar de sus dimensiones relativamente pequeñas, es notable por el sistema de cubierta adoptado: sobre pilares de hormigón armado normal se apoyan los elementos de cobertura, prefabricados, de tres clases (cóncavos, convexos y vigas principales y enlazados de forma original, según los cálculos y proyecto del ingeniero Antonio Migliasso.

  4. Alighment and Vibration Issues in TeV Linear Collider Design

    Energy Technology Data Exchange (ETDEWEB)

    Fischer, G.E.; /SLAC

    2005-08-12

    The next generation of linear colliders will require alignment accuracies and stabilities of component placement at least one, perhaps two, orders of magnitude better than can be achieved by the conventional methods and procedures in practice today. The magnitudes of these component-placement tolerances for current designs of various linear collider subsystems are tabulated. In the micron range, long-term ground motion is sufficiently rapid that on-line reference and mechanical correction systems are called for. Some recent experiences with the upgraded SLAC laser alignment systems and examples of some conceivable solutions for the future are described. The so called ''girder'' problem is discussed in the light of ambient and vibratory disturbances. The importance of the quality of the underlying geology is stressed. The necessity and limitations of particle-beam-derived placement information are mentioned.

  5. Modifications to the SPS LSS6 Septa for LHC and the SPS Septa Diluters

    CERN Document Server

    Borburgh, Y; Goddard, B; Kadi, Y

    2006-01-01

    The Large Hadron Collider required the modification of the existing extraction channel in the long straight section (LSS) 6 of the CERN Super Proton Synchrotron (SPS), including the suppression of the electrostatic wire septa. The newly set up fast extraction will be used to transfer protons at 450 GeV/c as well as ions via the 2.9 km long transfer line TI 2 to Ring 1 of the LHC. The girder of the existing SPS DC septa was modified to accommodate a new septum protection element. Changes were also applied to the septum diluter in the fast extraction channel in LSS4, leading to the other LHC ring and the CNGS facility. The requirements and the layout of the new LSS6 extraction channel will be described including a discussion of the design and performance of the installed septum diluters.

  6. Computer modeling of road bridge for simulation moving load

    Directory of Open Access Journals (Sweden)

    Miličić Ilija M.

    2016-01-01

    Full Text Available In this paper is shown computational modelling one span road structures truss bridge with the roadway on the upper belt of. Calculation models were treated as planar and spatial girders made up of 1D finite elements with applications for CAA: Tower and Bridge Designer 2016 (2nd Edition. The conducted computer simulations results are obtained for each comparison of the impact of moving load according to the recommendations of the two standards SRPS and AASHATO. Therefore, it is a variant of the bridge structure modeling application that provides Bridge Designer 2016 (2nd Edition identical modeled in an environment of Tower. As important information for the selection of a computer applications point out that the application Bridge Designer 2016 (2nd Edition we arent unable to treat the impacts moving load model under national standard - V600. .

  7. Nondestructive Evaluation of Railway Bridge by System Identification Using Field Vibration Measurement

    International Nuclear Information System (INIS)

    Ho, Duc Duy; Hong, Dong Soo; Kim, Jeong Tae

    2010-01-01

    This paper presents a nondestructive evaluation approach for system identification (SID) of real railway bridges using field vibration test results. First, a multi-phase SID scheme designed on the basis of eigenvalue sensitivity concept is presented. Next, the proposed multi-phase approach is evaluated from field vibration tests on a real railway bridge (Wondongcheon bridge) located in Yangsan, Korea. On the steel girder bridge, a few natural frequencies and mode shapes are experimentally measured under the ambient vibration condition. The corresponding modal parameters are numerically calculated from a three-dimensional finite element (FE) model established for the target bridge. Eigenvalue sensitivities are analyzed for potential model-updating parameters of the FE model. Then, structural subsystems are identified phase-by-phase using the proposed model-updating procedure. Based on model-updating results, a baseline model and a nondestructive evaluation of test bridge are identified

  8. Estimation of Curvature Changes for Steel-Concrete Composite Bridge Using Fiber Bragg Grating Sensors

    Directory of Open Access Journals (Sweden)

    Donghoon Kang

    2013-01-01

    Full Text Available This study is focused on the verification of the key idea of a newly developed steel-concrete composite bridge. The key idea of the proposed bridge is to reduce the design moment by applying vertical prestressing force to steel girders, so that a moment distribution of a continuous span bridge is formed in a simple span bridge. For the verification of the key technology, curvature changes of the bridge should be monitored sequentially at every construction stage. A pair of multiplexed FBG sensor arrays is proposed in order to measure curvature changes in this study. They are embedded in a full-scale test bridge and measured local strains, which are finally converted to curvatures. From the result of curvature changes, it is successfully ensured that the key idea of the proposed bridge, expected theoretically, is viable.

  9. Failure Load Test of a CFRP Strengthened Railway Bridge in Oumlrnskoumlldsvik, Sweden

    DEFF Research Database (Denmark)

    Täljsten, Björn; Bergström, Markus; Carolin, Anders

    2009-01-01

    using carbon fiber reinforced polymer (CFRP) rectangular rods epoxy bonded in sawed up slots, e.g., near surface mounted reinforcement. The strengthening was very successful and resulted in a desired shear failure when the bridge was loaded to failure. The load-carrying capacity in bending...... steel reinforcement by approximately 10%, and increased the height of the compressed zone by 100 mm. When the shear failure occurred, the utilization of the compression concrete and CFRP rods were 100 and 87.5%, respectively. This indicates that a bending failure indeed was about to occur, even though......, Sweden is presented. In this particular test the shear capacity of the concrete girders was of primary interest. However, for any reasonable placement of the load (a line load placed transverse to the track direction) a bending failure would occur. This problem was solved by strengthening for flexure...

  10. Ship construction and welding

    CERN Document Server

    Mandal, Nisith R

    2017-01-01

    This book addresses various aspects of ship construction, from ship types and construction materials, to welding technologies and accuracy control. The contents of the book are logically organized and divided into twenty-one chapters. The book covers structural arrangement with longitudinal and transverse framing systems based on the service load, and explains basic structural elements like hatch side girders, hatch end beams, stringers, etc. along with structural subassemblies like floors, bulkheads, inner bottom, decks and shells. It presents in detail double bottom construction, wing tanks & duct keels, fore & aft end structures, etc., together with necessary illustrations. The midship sections of various ship types are introduced, together with structural continuity and alignment in ship structures. With regard to construction materials, the book discusses steel, aluminum alloys and fiber reinforced composites. Various methods of steel material preparation are discussed, and plate cutting and form...

  11. Puente pretensado sobre el río Main

    Directory of Open Access Journals (Sweden)

    Wittfoht, Hans

    1965-04-01

    Full Text Available This project, which was adjudicated to the firm Polensky & Zöllner, consists of a prestressed concrete bridge of three spans, 85, 140 and 85 m in length. Their shape and slenderness is well adapted to the natural beauty of the surrounding scenery. The axes of the bridge and of the river make an angle of 72° with respect to each other. Also, the bridge, in planform, is a circular arc of 1400 m radius. In the vertical plane, the outline of the bridge is also a circular arc, but of 14000 m radius. Its concavity faces upwards, and the lowest point is near the crown. The concreting of the two box girders, which support the pavement and sidewalks, has been carried out by a combined method of cantilevering and moveable formwork. The formwork was supported by a sliding framework, which could be shifted from place to place, as the overhanging section of the girders increased. This framework enabled a section 7 by 3.5 m in area to be constructed. Work started at a pillar, and developed simultaneously on both sides of it. The prestressing has been the main aspect of the mixed type of construction adopted. The construction by sections, and the large number of longitudinal and transversal cables has required special care in anchoring and aligning the cables. To avoid cracking, a number of helix shaped tubes were placed in the fresh concrete to absorb the hydration heat of the setting concrete. During the process of construction the girders were rigidly joined to the piles, so that the whole bridge structure became a single monolithic unit.El proyecto definitivo, adjudicado por concurso a la empresa Polensky & Zöllner, consiste en una estructura de hormigón pretensado de tres tramos, de 85, 140 y 85 m de luz, respectivamente, y cuya forma y esbeltez se adaptará a la belleza natural del paisaje local. Los ejes del puente y río forman un ángulo de 72°, y el de la calzada es una línea circular de 1.400 m de radio. En el plano vertical, el perfil del

  12. Viaducto de Chonta en la autopista Bilbao-Behobia – España

    Directory of Open Access Journals (Sweden)

    Aparicio, G.

    1974-03-01

    Full Text Available Located in the Bilbao-Behobia motorway, passing through Eibar, it has a curved layout and supports two carriageways of 11.5 m in width. The flooring is made up of two bracket spans,, of 52 m each, made on site, and by another two, of 43 m each, formed by five prestressed prefabricated girders; the two abutments are conventional. We would stress the curious construction of the formwork, for the in situ spans, and launching of the 43 m girders with 120 t 45 m. Sicet cart, carried out by Ferrovial, S. A. The sloping piles —18 m apart in the middle line in their upper part and 4 in the foundations— are, however, the most original and interesting feature of this work. In order to be able to use the sliding formwork and avoid building side timbering and which hamper traffic below, they were made in a vertical position, subsequently opening, rotating on metal ball-joints With this type of piles, the initial span of 95 m is reduced to 77 m.Situado en la autopista Bilbao-Behobia, a su paso por Eibar, presenta un trazado en curva y soporta dos calzadas de 11,50 m de anchura. El tablero está constituido por dos tramos ménsula, de 52 m cada uno, fabricados in situ, y por otros dos, de 43 m, formados por cinco vigas prefabricadas pretensadas; los dos estribos son tradicionales. Destacamos la curiosa construcción de los encofrados, para los tramos in situ, y el lanzamiento de las vigas de 43 m con carro Sicet de 120 t y 45 m, realizada por Ferrovial, S. A. Las pilas inclinadas —18 m de separación de medianas en su parte alta y 4 en cimientos— son, sin embargo, la nota más original e interesante de esta obra, ya que para poder utilizar los encofrados deslizantes y evitar la construcción de apeos costosos y entorpecedores del tráfico inferior se realizaron en posición vertical, abriéndose, posteriormente, con giro sobre rótulas metálicas. Con este tipo de pilas se reduce la luz inicial de 95 m a 77 m.

  13. Nuevo puente de La Barca sobre el río Ter

    Directory of Open Access Journals (Sweden)

    Rodríguez-Borlado, Ramiro

    1967-12-01

    Full Text Available The new La Barca bridge, over the river Ter, is on the northern approach to Gerona, and carries the CN II road from Madrid to France, passing through Barcelona. It substitutes another bridge of the same name, which was inadequate for the heavy increase in traffic, during recent years. The bridge is 128 m long, consisting of two lateral spans, each 37 m long, and a central span of 54 m. The superstructure consists of ten hollow metal girders, of variable depth, arranged as three-part cantilevered structures. The lateral sections are cantilevered towards the centre, and the middle part of the span rests on their extremities. The girders support a reinforced concrete slab of 16 cm thickness and 14 m width: 8 m for the roadway, and 3 m for each of the sidewalks. The structure rests on two piles and two abutments of reinforced concrete, based on caisson foundations, except for one of the abutments, which is a reinforced concrete block. The project is completed by the approach roads and stonemasonry.El nuevo puente de La Barca, sobre el río Ter, está situado en el acceso norte a Gerona de la C. N. II de Madrid a Francia por Barcelona. Sustituye a otro del mismo nombre que resultaba insuficiente para la elevada intensidad de tráfico de esta vía. La luz del puente es de 128 m, dividida en dos tramos laterales, de 37 m de luz, y un tramo central, de 54 m. La superestructura está constituida por cinco vigas metálicas, huecas, de canto variable, dispuestas como vigas cantilever de tres elementos. Los elementos laterales se prolongan hacia el centro en voladizo, apoyándose sobre ellos el elemento central. Las vigas soportan una losa de hormigón armado de 16 cm de espesor, y 14 m de anchura: 8 m para la calzada y 3 m para cada uno de los andenes laterales. El conjunto se apoya sobre dos pilas y dos estribos, de hormigón armado, cimentados sobre cajones indios, excepto uno de los estribos, que está cimentado sobre macizo de hormigón armado

  14. Seismic Analysis for a Crane System

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Kang Soo; Lee, Chung Young; Ryu, Jeong Soo [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2012-05-15

    The operation bridge used for an open-pool type research reactor is a crane system with a working deck for the handling of in-pool parts such as fuels, reactor components and reactor utilization facilities. The operation bridge allows operators to access the top of the reactor in the reactor pool and the fuel storage racks in the service pool. The operation bridge contains an operating platform mounted on a truck travelling on rails. Upright members are mounted on the truck to support the upper structure and two hoist monorails. The operation bridge consists of two hoists, upper girder frames, legs, cables, saddle frames, upper deck frames, lower deck frames, and the ladder. Static and dynamic analyses are performed to evaluate the structural integrity for the operation bridge for the required design loadings. The response spectrum analysis is employed as a dynamic analysis method

  15. Reduction Methods for Real-time Simulations in Hybrid Testing

    DEFF Research Database (Denmark)

    Andersen, Sebastian

    2016-01-01

    Hybrid testing constitutes a cost-effective experimental full scale testing method. The method was introduced in the 1960's by Japanese researchers, as an alternative to conventional full scale testing and small scale material testing, such as shake table tests. The principle of the method...... is performed on a glass fibre reinforced polymer composite box girder. The test serves as a pilot test for prospective real-time tests on a wind turbine blade. The Taylor basis is implemented in the test, used to perform the numerical simulations. Despite of a number of introduced errors in the real...... is to divide a structure into a physical substructure and a numerical substructure, and couple these in a test. If the test is conducted in real-time it is referred to as real time hybrid testing. The hybrid testing concept has developed significantly since its introduction in the 1960', both with respect...

  16. Vehicle Signal Analysis Using Artificial Neural Networks for a Bridge Weigh-in-Motion System

    Directory of Open Access Journals (Sweden)

    Min-Seok Park

    2009-10-01

    Full Text Available This paper describes the procedures for development of signal analysis algorithms using artificial neural networks for Bridge Weigh-in-Motion (B-WIM systems. Through the analysis procedure, the extraction of information concerning heavy traffic vehicles such as weight, speed, and number of axles from the time domain strain data of the B-WIM system was attempted. As one of the several possible pattern recognition techniques, an Artificial Neural Network (ANN was employed since it could effectively include dynamic effects and bridge-vehicle interactions. A number of vehicle traveling experiments with sufficient load cases were executed on two different types of bridges, a simply supported pre-stressed concrete girder bridge and a cable-stayed bridge. Different types of WIM systems such as high-speed WIM or low-speed WIM were also utilized during the experiments for cross-checking and to validate the performance of the developed algorithms.

  17. Vehicle Signal Analysis Using Artificial Neural Networks for a Bridge Weigh-in-Motion System.

    Science.gov (United States)

    Kim, Sungkon; Lee, Jungwhee; Park, Min-Seok; Jo, Byung-Wan

    2009-01-01

    This paper describes the procedures for development of signal analysis algorithms using artificial neural networks for Bridge Weigh-in-Motion (B-WIM) systems. Through the analysis procedure, the extraction of information concerning heavy traffic vehicles such as weight, speed, and number of axles from the time domain strain data of the B-WIM system was attempted. As one of the several possible pattern recognition techniques, an Artificial Neural Network (ANN) was employed since it could effectively include dynamic effects and bridge-vehicle interactions. A number of vehicle traveling experiments with sufficient load cases were executed on two different types of bridges, a simply supported pre-stressed concrete girder bridge and a cable-stayed bridge. Different types of WIM systems such as high-speed WIM or low-speed WIM were also utilized during the experiments for cross-checking and to validate the performance of the developed algorithms.

  18. Hydroelastic response of 19,000 TEU class ultra large container ship with novel mobile deckhouse for maximizing cargo capacity

    Directory of Open Access Journals (Sweden)

    Hong-Il Im

    2017-05-01

    Full Text Available This paper is related to structural design evaluation of 19,000 TEU ultra large container ship, dealing with hydroelastic response, i.e. springing and whipping. It illustrates application of direct calculation tools and methodologies to both fatigue and ultimate strength assessment, simultaneously taking into account ship motions and her elastic deformations. Methodology for springing and whipping assessment within so called WhiSp notation is elaborated in details, and in order to evaluate innovative container ship design with increased loading capacity, a series of independent hydroelastic computations for container ship with mobile deckhouse and conventional one are performed with the same calculation setup. Fully coupled 3D FEM – 3D BEM model is applied, while the ultimate bending capacity of hull girder is determined by means of MARS software. Beside comparative analysis of representative quantities for considered ships, relative influence of hydroelasticity on ship response is addressed.

  19. Nailed timber beams with I composed section

    Directory of Open Access Journals (Sweden)

    Jorge Luís Nunes de Góes

    2003-01-01

    Full Text Available The employment of built-up timber beams, made of commercial dimensions pieces, is becoming increasingly important in timber structures in Brazil, mainly due to the ever-growing scarcity of timber elements in larger sizes. The built-up system has vast application, from beams for residential buildings to girders for small bridges. The objective of this work is the theoretical and experimental study of nailed timber beams with composed cross section I. The design procedure of EUROCODE 5/93 and NBR 7190/97 are shown and evaluated, as well as the theory about the subject matter. The experimental evaluation of the theoretical models was made by means of bending tests in prototypes of built-up timber beams. The obtained results shows that the EUROCODE 5/93 procedure is the most indicated for evaluating effective bending stiffness, normal and shear stresses as well as the load on fasteners.

  20. Estimation of Structure-Borne Noise Reduction Effect of Steel Railway Bridge Equipped with Floating Ladder Track and Floating Reinforced-Concrete Deck

    Science.gov (United States)

    Watanabe, Tsutomu; Sogabe, Masamichi; Asanuma, Kiyoshi; Wakui, Hajime

    A number of steel railway bridges have been constructed in Japan. Thin steel members used for the bridges easily tend to vibrate and generate structure-borne noise. Accordingly, the number of constructions of steel railway bridges tends to decrease in the urban areas from a viewpoint of environmental preservation. Then, as a countermeasure against structure-borne noise generated from steel railway bridges, we have developed a new type of the steel railway bridge equipped with a floating-ladder track and a floating reinforced-concrete (RC) deck. As a result of train-running experiment, it became apparent that the new steel railway bridge installed by double floating system has reduced a vibration velocity level by 10.5 dB(A) at main girder web as compared with a steel railway bridge installed by directly fastened track. This reduction effect was achieved by the ladder track and RC deck supported by resilient materials.

  1. Seismic Analysis for a Crane System

    International Nuclear Information System (INIS)

    Kim, Kang Soo; Lee, Chung Young; Ryu, Jeong Soo

    2012-01-01

    The operation bridge used for an open-pool type research reactor is a crane system with a working deck for the handling of in-pool parts such as fuels, reactor components and reactor utilization facilities. The operation bridge allows operators to access the top of the reactor in the reactor pool and the fuel storage racks in the service pool. The operation bridge contains an operating platform mounted on a truck travelling on rails. Upright members are mounted on the truck to support the upper structure and two hoist monorails. The operation bridge consists of two hoists, upper girder frames, legs, cables, saddle frames, upper deck frames, lower deck frames, and the ladder. Static and dynamic analyses are performed to evaluate the structural integrity for the operation bridge for the required design loadings. The response spectrum analysis is employed as a dynamic analysis method

  2. Evaluation of High-Speed Railway Bridges Based on a Nondestructive Monitoring System

    Directory of Open Access Journals (Sweden)

    Mosbeh R. Kaloop

    2016-01-01

    Full Text Available Recently, trains’ velocities in Korea increased more than the speed used in the design of some bridges. Accordingly, this paper demonstrates the evaluation of a railway bridge due to high-speed trains’ movement. A nondestructive monitoring system is used to assess the bridge performance under train speeds of 290, 360, 400 and 406 km/h. This system is comprised of a wireless short-term acceleration system and strain monitoring sensors attached to the bridge girder. The results of the analytical methods in time and frequency domains are presented. The following conclusions are obtained: the cross-correlation models for accelerations and strain measurements are effective to predict the performance of the bridge; the static behavior is increased with train speed developments; and the vibration, torsion, fatigue and frequency contents analyses of the bridge show that the bridge is safe under applied trains’ speeds.

  3. CALCULATION ALGORITHM TRUSS UNDER CRANE BEAMS

    Directory of Open Access Journals (Sweden)

    N. K. Akaev1

    2016-01-01

    Full Text Available Aim.The task of reducing the deflection and increase the rigidity of single-span beams are made. In the article the calculation algorithm for truss crane girders is determined.Methods. To identify the internal effort required for the selection of cross section elements the design uses the Green's function.Results. It was found that the simplest truss system reduces deflection and increases the strength of design. The upper crossbar is subjected not only to bending and shear and compression work due to tightening tension. Preliminary determination of the geometrical characteristics of the crane farms elements are offered to make a comparison with previous similar configuration of his farms, using a simple approximate calculation methods.Conclusion.The method of sequential movements (incrementally the two bridge cranes along the length of the upper crossbar truss beams is suggested. We give the corresponding formulas and conditions of safety.

  4. Proposal of self-anchored cable-supported bridge with main span length of 500m; Chuo span 500m kibo no jiteishiki tsurigatashiki kyoryo ni kansuru teian

    Energy Technology Data Exchange (ETDEWEB)

    Fukasawa, Y.; Sugiyama, T. [Yamaguchi University, Yamaguchi (Japan). Faculty of Engineering; Kaneko, S.; Mukoyama, T.; Iwaki, T. [Pacific Consultants K.K., Tokyo (Japan)

    1995-12-15

    In order to investigate the feasibility of construction of cable-supported bridge at the site where ground condition is poor and/or air route restriction shoed be considered the static and dynamic characteristics of both self-anchored cable-stayed bridge with relatively low tower and self-anchored suspension bridge have been discussed. The main span length of bridge considered here is about 500 m because of the fact that stress resultant of main girder caused by design loads is considerably lower than its design strength in the existing cable-supported bridges of this scale. The result shows that the application of both types of cable-supported bridges to the above described site may be possible as enough static safety and economy are ensured. It has been also revealed that no problem may occur from both wind and earthquake resistant viewpoints. 10 refs., 24 figs., 8 tabs.

  5. Solid Modeling and Finite Element Analysis of an Overhead Crane Bridge

    Directory of Open Access Journals (Sweden)

    C. Alkin

    2005-01-01

    Full Text Available The design of an overhead crane bridge with a double box girder has been investigated and a case study of a crane with 35 ton capacity and 13 m span length has been conducted. In the initial phase of the case study, conventional design calculations proposed by F. E. M. Rules and DIN standards were performed to verify the stress and deflection levels. The crane design was modeled using both solids and surfaces. Finite element meshes with 4-node tetrahedral and 4-node quadrilateral shell elements were generated from the solid and shell models, respectively. After a comparison of the finite element analyses, the conventional calculations and performance of the existing crane, the analysis with quadratic shell elements was found to give the most realistic results. As a result of this study, a design optimization method for an overhead crane is proposed. 

  6. Oscillating water column structural model

    Energy Technology Data Exchange (ETDEWEB)

    Copeland, Guild [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Bull, Diana L [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Jepsen, Richard Alan [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Gordon, Margaret Ellen [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2014-09-01

    An oscillating water column (OWC) wave energy converter is a structure with an opening to the ocean below the free surface, i.e. a structure with a moonpool. Two structural models for a non-axisymmetric terminator design OWC, the Backward Bent Duct Buoy (BBDB) are discussed in this report. The results of this structural model design study are intended to inform experiments and modeling underway in support of the U.S. Department of Energy (DOE) initiated Reference Model Project (RMP). A detailed design developed by Re Vision Consulting used stiffeners and girders to stabilize the structure against the hydrostatic loads experienced by a BBDB device. Additional support plates were added to this structure to account for loads arising from the mooring line attachment points. A simplified structure was designed in a modular fashion. This simplified design allows easy alterations to the buoyancy chambers and uncomplicated analysis of resulting changes in buoyancy.

  7. Autopista Bilbao-Behobia España

    Directory of Open Access Journals (Sweden)

    Editorial, Equipo

    1978-11-01

    Full Text Available The construction of the Oyarzun-Behovia stretch of the Bilbao-Behovia motorway has meant the completion of this important means of communication in the Basque Country. Earth moving work has been of the order of 25 million cubic meters. The project includes 7 overpasses, 16 underpasses and three bridges. The structures have been built using poststresser light-weight slabs, reinforced caissons and poststressed girders with «reinforced earth work» abutments.

    La construcción del tramo Oyarzun-Behobia ha permitido finalizar la Autopista Bilbao-Behobia, importante realización para las comunicaciones en el País Vasco. Se ha hecho movimiento de tierras, del orden de los 25 millones de metros cúbicos. La obra consta de: - 7 pasos superiores, - 16 pasos inferiores, y - 3 puentes. Las estructuras han sido realizadas con losas aligeradas postensadas, cajones armados y vigas postensadas con estribos de «tierra armada».

  8. Mechanical properties of high-strength concrete

    Science.gov (United States)

    Mokhtarzadeh, Alireza

    This report summarizes an experimental program conducted to investigate production techniques and mechanical properties of high strength concrete in general and to provide recommendations for using these concretes in manufacturing precast/prestressed bridge girders. Test variables included total amount and composition of cementitious material (portland cement, fly ash, and silica fume), type and brand of cement, type of silica fume (dry densified and slurry), type and brand of high-range water-reducing admixture, type of aggregate, aggregate gradation, maximum aggregate size, and curing. Tests were conducted to determine the effects of these variables on changes in compressive strength and modulus of elasticity over time, splitting tensile strength, modulus of rupture, creep, shrinkage, and absorption potential (as an indirect indicator of permeability). Also investigated were the effects of test parameters such as mold size, mold material, and end condition. Over 6,300 specimens were cast from approximately 140 mixes over a period of 3 years.

  9. Assessing Static Performance of the Dashengguan Yangtze Bridge by Monitoring the Correlation between Temperature Field and Its Static Strains

    Directory of Open Access Journals (Sweden)

    Gao-Xin Wang

    2015-01-01

    Full Text Available Taking advantage of the structural health monitoring system installed on the steel truss arch girder of Dashengguan Yangtze Bridge, the temperature field data and static strain data are collected and analyzed for the static performance assessment of the bridge. Through analysis, it is found that the static strain changes are mainly caused by temperature field (temperature and temperature difference and train. After the train-induced static strains are removed, the correlation between the remaining static strains and the temperature field shows apparent linear characteristics, which can be mathematically modeled for the description of static performance. Therefore, multivariate linear regression function combined with principal component analysis is introduced to mathematically model the correlation. Furthermore, the residual static strains of mathematical model are adopted as assessment indicator and three kinds of degradation regulations of static performance are obtained after simulation of the residual static strains. Finally, it is concluded that the static performance of Dashengguan Yangtze Bridge was in a good condition during that period.

  10. Challenges of in-vacuum and cryogenic permanent magnet undulator technologies

    Directory of Open Access Journals (Sweden)

    Jui-Che Huang

    2017-06-01

    Full Text Available An in-vacuum undulator (IVU provides a means to reach high-brilliance x rays in medium energy storage rings. The development of short period undulators with low phase errors creates the opportunity for an unprecedented brilliant light source in a storage ring. Since the spectral quality from cryogenic permanent magnet undulators (CPMUs has surpassed that of IVUs, NdFeB or PrFeB CPMUs have been proposed for many new advanced storage rings to reach high brilliance x-ray photon beams. In a low emittance ring, not only the performance of the undulator but also the choice of the lattice functions are important design considerations. Optimum betatron functions and a zero-dispersion function shall be provided in the straight sections for IVU/CPMUs. In this paper, relevant factors and design issues for IVUs and CPMUs are discussed together with many technological challenges in short period undulators associated with beam induced–heat load, phase errors, and the deformation of support girders.

  11. Prestressed Ring Beam in the Church of St. Peter’s and Paul’s in Bodzanow, Design and Realization

    Science.gov (United States)

    Szydlowski, Rafal; Labuzek, Barbara; Turcza, Monika

    2017-10-01

    The present trend in architecture is designing thin. slender and spacious architectural forms. It has become the reason for searching for new solutions and finding new ways of use of the existing construction ones. Recently, the first time in Poland, the post-tensioning has been used in realization of church building. In the Church of St. Peter’s and Paul’s in Bodzanow (near Cracow) was designed circumferential ring beam post-tensioned with 4 unbounded tendons to transfer peripheral tensile forces from the roof. Thanks to the use of a prestressed ring beam hidden in the wall, large cross-section of roof girders was possible to be avoided, as well as a massive reinforced concrete ring or additional steel tie-rods. The paper presents the applied solutions in details with the theoretical calculated results as well as the results of prestressing measured in site during tensioning of tendons. Based on presented results some conclusions have been drawn.

  12. Monitoring calculation of closure change of Extradosed Cable-stayed Bridge

    Science.gov (United States)

    Shi, Jing Xian; Ran, Zhi Hong

    2018-06-01

    During the construction of extradosed cable-stayed bridge in Yunnan province, China, the construction unit has made certain changes in the construction process of the closure section due to environmental restrictions: remove the hanging basket after the closure, the sling shall not be provided in closure section, the function of the sling is realized by the hanging basket on the 16th beam. In case of this change, the bridge has been constructed to section 15th. In order to ensure the smooth and orderly progress of each stage in the closure phase, this article is arranged according to the construction plan, appropriate adjustment of related procedures, checking the bridge safety at all stages of construction, the stress and force of the main girder are compared to ensure the safety of the construction after closure changes. Adjust the height of the beam of the 16th and 17th to adapt the new construction plan, and the bridge closure smoothly.

  13. Challenges of in-vacuum and cryogenic permanent magnet undulator technologies

    Science.gov (United States)

    Huang, Jui-Che; Kitamura, Hideo; Yang, Chin-Kang; Chang, Cheng-Hsing; Chang, Cheng-Hsiang; Hwang, Ching-Shiang

    2017-06-01

    An in-vacuum undulator (IVU) provides a means to reach high-brilliance x rays in medium energy storage rings. The development of short period undulators with low phase errors creates the opportunity for an unprecedented brilliant light source in a storage ring. Since the spectral quality from cryogenic permanent magnet undulators (CPMUs) has surpassed that of IVUs, NdFeB or PrFeB CPMUs have been proposed for many new advanced storage rings to reach high brilliance x-ray photon beams. In a low emittance ring, not only the performance of the undulator but also the choice of the lattice functions are important design considerations. Optimum betatron functions and a zero-dispersion function shall be provided in the straight sections for IVU/CPMUs. In this paper, relevant factors and design issues for IVUs and CPMUs are discussed together with many technological challenges in short period undulators associated with beam induced-heat load, phase errors, and the deformation of support girders.

  14. A Review on Strengthening Steel Beams Using FRP under Fatigue

    Directory of Open Access Journals (Sweden)

    Mohamed Kamruzzaman

    2014-01-01

    Full Text Available In recent decades, the application of fibre-reinforced polymer (FRP composites for strengthening structural elements has become an efficient option to meet the increased cyclic loads or repair due to corrosion or fatigue cracking. Hence, the objective of this study is to explore the existing FRP reinforcing techniques to care for fatigue damaged structural steel elements. This study covers the surface treatment techniques, adhesive curing, and support conditions under cyclic loading including fatigue performance, crack propagation, and failure modes with finite element (FE simulation of the steel bridge girders and structural elements. FRP strengthening composites delay initial cracking, reduce the crack growth rate, extend the fatigue life, and decrease the stiffness decay with residual deflection. Prestressed carbon fibre-reinforced polymer (CFRP is the best strengthening option. End anchorage prevents debonding of the CRRP strips at the beam ends by reducing the local interfacial shear and peel stresses. Hybrid-joint, nanoadhesive, and carbon-flex can also be attractive for strengthening systems.

  15. A review on strengthening steel beams using FRP under fatigue.

    Science.gov (United States)

    Kamruzzaman, Mohamed; Jumaat, Mohd Zamin; Sulong, N H Ramli; Islam, A B M Saiful

    2014-01-01

    In recent decades, the application of fibre-reinforced polymer (FRP) composites for strengthening structural elements has become an efficient option to meet the increased cyclic loads or repair due to corrosion or fatigue cracking. Hence, the objective of this study is to explore the existing FRP reinforcing techniques to care for fatigue damaged structural steel elements. This study covers the surface treatment techniques, adhesive curing, and support conditions under cyclic loading including fatigue performance, crack propagation, and failure modes with finite element (FE) simulation of the steel bridge girders and structural elements. FRP strengthening composites delay initial cracking, reduce the crack growth rate, extend the fatigue life, and decrease the stiffness decay with residual deflection. Prestressed carbon fibre-reinforced polymer (CFRP) is the best strengthening option. End anchorage prevents debonding of the CRRP strips at the beam ends by reducing the local interfacial shear and peel stresses. Hybrid-joint, nanoadhesive, and carbon-flex can also be attractive for strengthening systems.

  16. Design of joints in steel and composite structures Eurocode 3 : design of steel structures : part 1-8 : design of joints, Eurocode 4 : design of composite steel and concrete structures : part 1-1 : general rules and rules for buildings

    CERN Document Server

    Jaspart, Jean-Pierre

    2016-01-01

    This book details the basic concepts and the design rules included in Eurocode 3 Design of steel structures Part 1-8 Design of joints. Joints in composite construction are also addressed through references to Eurocode 4 Design of composite steel and concrete structures Part 1-1 General rules and rules for buildings. Attention has to be duly paid to the joints when designing a steel or composite structure, in terms of the global safety of the construction, and also in terms of the overall cost, including fabrication, transportation and erection. Therefore, in this book, the design of the joints themselves is widely detailed, and aspects of selection of joint configuration and integration of the joints into the analysis and the design process of the whole construction are also fully covered. Connections using mechanical fasteners, welded connections, simple joints, moment-resisting joints and lattice girder joints are considered. Various joint configurations are treated, including beam-to-column, beam-to-beam, ...

  17. Hybrid Bridge Structures Made of Frp Composite and Concrete

    Science.gov (United States)

    Rajchel, Mateusz; Siwowski, Tomasz

    2017-09-01

    Despite many advantages over the conventional construction materials, the contemporary development of FRP composites in bridge engineering is limited due to high initial cost, low stiffness (in case of glass fibers) and sudden composite failure mode. In order to reduce the given limitations, mixed (hybrid) solutions connecting the FRP composites and conventional construction materials, including concrete, have been tested in many countries for 20 years. Shaping the hybrid structures based on the attributes of particular materials, aims to increase stiffness and reduce cost without losing the carrying capacity, lightness and easiness of bridges that includes such hybrid girders, and to avoid the sudden dangerous failure mode. In the following article, the authors described examples of hybrid road bridges made of FRP composite and concrete within the time of 20 years and presented the first Polish hybrid FRP-concrete road bridge. Also, the directions of further research, necessary to spread these innovative, advanced and sustainable bridge structures were indicated.

  18. Single-failure-proof cranes for nuclear power plants

    International Nuclear Information System (INIS)

    Porse, L.

    1979-05-01

    NRC has licensed reactors on the basis that the safe handling of critical loads can be accomplished by adding safety features to the handling equipment, by adding special features to the structures and areas over which the critical load is carried, or by a combination of the two. When reliance for the safe handling of critical loads is placed on the crane system itself, the system should be designed so that a single failure will not result in the loss of the capability of the system to safely retain the load. Features of the design, fabrication, installation, inspection, testing, and operation of single-failure-proof overhead crane handling systems that are used for handling critical loads are identified. These features are limited to the hoisting system and to braking systems for trolley and bridge. Other load-bearing items such as girders should be conservatively designed but need not be considered single failure proof

  19. New sensor and non-contact geometrical survey for the vibrating wire technique

    Energy Technology Data Exchange (ETDEWEB)

    Geraldes, Renan [Brazilian Synchrotron Light Laboratory (LNLS), Campinas, SP (Brazil); Junqueira Leão, Rodrigo, E-mail: rodrigo.leao@lnls.br [Brazilian Synchrotron Light Laboratory (LNLS), Campinas, SP (Brazil); Cernicchiaro, Geraldo [Brazilian Center for Research in Physics (CBPF), Rio de Janeiro, RJ (Brazil); Terenzi Neuenschwander, Regis; Citadini, James Francisco; Droher Rodrigues, Antônio Ricardo [Brazilian Synchrotron Light Laboratory (LNLS), Campinas, SP (Brazil)

    2016-03-01

    The tolerances for the alignment of the magnets in the girders of the next machine of the Brazilian Synchrotron Light Laboratory (LNLS), Sirius, are as small as 40 µm for translations and 0.2 mrad for rotations. Therefore, a novel approach to the well-known vibrating wire technique has been developed and tested for the precise fiducialization of magnets. The alignment bench consists of four commercial linear stages, a stretched wire, a commercial lock-in amplifier working with phase-locked loop (PLL), a coordinate measuring machine (CMM) and a vibration sensor for the wire. This novel sensor has been designed for a larger linear region of operation. For the mechanical metrology step of the fiducialization of quadrupoles an innovative technique, using the vision system of the CMM, is presented. While the work with pitch and yaw orientations is still ongoing with promising partial results, the system already presents an uncertainty level below 10 µm for translational alignment.

  20. Full Scale Test of a SSP 34m boxgirder 2

    DEFF Research Database (Denmark)

    Jensen, Find Mølholt; Branner, Kim; Nielsen, Per Hørlyk

    was part of a proof of concept investigation for a patent. The tests were performed at the Blaest test facility in August 2007. The tests are an important part of a research project established in cooperation between Risø National Laboratory for sustainable energy – Technical university of Denmark, SSP......This report presents the setup and result from three static full-scale tests of the reinforced glass fiber/epoxy box girder used in a 34m wind turbine blade. One test was without reinforcement one with cap reinforcement and the final test was with rib reinforcement. The cap reinforcement test......-Technology A/S and Blaest (Blade test centre A/S) and it has been performed as a part of Find Mølholt Jensen’s PhD thesis. This report is the second data report containing the complete test data for the three full-scale tests. This report deals only with the test methods and the obtained results...

  1. A Review on Strengthening Steel Beams Using FRP under Fatigue

    Science.gov (United States)

    Jumaat, Mohd Zamin; Ramli Sulong, N. H.

    2014-01-01

    In recent decades, the application of fibre-reinforced polymer (FRP) composites for strengthening structural elements has become an efficient option to meet the increased cyclic loads or repair due to corrosion or fatigue cracking. Hence, the objective of this study is to explore the existing FRP reinforcing techniques to care for fatigue damaged structural steel elements. This study covers the surface treatment techniques, adhesive curing, and support conditions under cyclic loading including fatigue performance, crack propagation, and failure modes with finite element (FE) simulation of the steel bridge girders and structural elements. FRP strengthening composites delay initial cracking, reduce the crack growth rate, extend the fatigue life, and decrease the stiffness decay with residual deflection. Prestressed carbon fibre-reinforced polymer (CFRP) is the best strengthening option. End anchorage prevents debonding of the CRRP strips at the beam ends by reducing the local interfacial shear and peel stresses. Hybrid-joint, nanoadhesive, and carbon-flex can also be attractive for strengthening systems. PMID:25243221

  2. Simplified Analytical Method for Optimized Initial Shape Analysis of Self-Anchored Suspension Bridges and Its Verification

    Directory of Open Access Journals (Sweden)

    Myung-Rag Jung

    2015-01-01

    Full Text Available A simplified analytical method providing accurate unstrained lengths of all structural elements is proposed to find the optimized initial state of self-anchored suspension bridges under dead loads. For this, equilibrium equations of the main girder and the main cable system are derived and solved by evaluating the self-weights of cable members using unstrained cable lengths and iteratively updating both the horizontal tension component and the vertical profile of the main cable. Furthermore, to demonstrate the validity of the simplified analytical method, the unstrained element length method (ULM is applied to suspension bridge models based on the unstressed lengths of both cable and frame members calculated from the analytical method. Through numerical examples, it is demonstrated that the proposed analytical method can indeed provide an optimized initial solution by showing that both the simplified method and the nonlinear FE procedure lead to practically identical initial configurations with only localized small bending moment distributions.

  3. Necrópolis chilotas: un caso en la diversidad patrimonial de un territorio insular/Chiloé’s necropolis: a case study

    Directory of Open Access Journals (Sweden)

    Bravo Sánchez, José

    2008-12-01

    Full Text Available Chiloé, en su condición de ínsula, se expresa en una riqueza cultural fuertemente territorializada, capaz de defenderse de las invasivas influencias foráneas. Merece la pena destacar una de las vigas que sostiene su andamiaje cultural: el poder omnipresente de la religión. En este sentido, sobresalen los cementerios chilotes como un ejemplo claro de simbiosis cultural religiosa que se manifiesta en una arquitectura mortuoria singular que enriquece al espacio y paisaje religioso de cada localidad./Chiloé, in its condition of island, it's express in a cultural wealth, heavily territorialized, with a capacity of defense of the invaders foreign influences. It's worth while to highlight at one of the girders that supports its cultural scaffolding: the omnipresent power of the religion. In this sense, chilotes cemeteries project like a clearly example of cultural symbiosis that it's exposes in a singular mortuary architecture that riches at religious space and landscape of each settlement.

  4. Process Modeling of Composite Materials for Wind-Turbine Rotor Blades: Experiments and Numerical Modeling

    Directory of Open Access Journals (Sweden)

    Birgit Wieland

    2017-10-01

    Full Text Available The production of rotor blades for wind turbines is still a predominantly manual process. Process simulation is an adequate way of improving blade quality without a significant increase in production costs. This paper introduces a module for tolerance simulation for rotor-blade production processes. The investigation focuses on the simulation of temperature distribution for one-sided, self-heated tooling and thick laminates. Experimental data from rotor-blade production and down-scaled laboratory tests are presented. Based on influencing factors that are identified, a physical model is created and implemented as a simulation. This provides an opportunity to simulate temperature and cure-degree distribution for two-dimensional cross sections. The aim of this simulation is to support production processes. Hence, it is modelled as an in situ simulation with direct input of temperature data and real-time capability. A monolithic part of the rotor blade, the main girder, is used as an example for presenting the results.

  5. Structural behavior of concrete box bridge using embedded FBG sensors

    Science.gov (United States)

    Chung, Wonseok; Kang, Donghoon

    2012-04-01

    For the structural monitoring of railway bridges, electromagnetic interference (EMI) is a significant problem as modern railway lines are powered by high-voltage electric power feeding systems. Fiber optic sensing systems are free from EMI and have been successfully applied in civil engineering fields. This study presents the application of fiber Bragg grating (FBG)-based sensing systems to precast concrete box railway bridges. A 20 m long full-scale precast concrete box railway girder was fabricated and tested in order to identify its static performance. The experimental program involved the measurement of the nonlinear static behavior until failure. Multiplexed FBG strain sensors were embedded along the length of steel rebar and a strain-induced wavelength shift was measured in order to monitor internal strains. The measured values from the FBG-based sensors are compared with the results using electric signal-based sensors. The results show that the FBG sensing system is promising and can improve the efficiency of structural monitoring for modern railway bridges.

  6. Process Modeling of Composite Materials for Wind-Turbine Rotor Blades: Experiments and Numerical Modeling.

    Science.gov (United States)

    Wieland, Birgit; Ropte, Sven

    2017-10-05

    The production of rotor blades for wind turbines is still a predominantly manual process. Process simulation is an adequate way of improving blade quality without a significant increase in production costs. This paper introduces a module for tolerance simulation for rotor-blade production processes. The investigation focuses on the simulation of temperature distribution for one-sided, self-heated tooling and thick laminates. Experimental data from rotor-blade production and down-scaled laboratory tests are presented. Based on influencing factors that are identified, a physical model is created and implemented as a simulation. This provides an opportunity to simulate temperature and cure-degree distribution for two-dimensional cross sections. The aim of this simulation is to support production processes. Hence, it is modelled as an in situ simulation with direct input of temperature data and real-time capability. A monolithic part of the rotor blade, the main girder, is used as an example for presenting the results.

  7. Design of pedestrian truss bridge with Sengon-Rubber laminated veneer lumber

    Science.gov (United States)

    Herbudiman, B.; Pranata, Y. A.; Pangestu, L.

    2017-12-01

    Timber bridges are one of the bridge that has long been used, but nowadays, large dimension of sawn timber has limited supply and also it is not environmental-friendly. Laminated veneer lumber (LVL) is a engineered wood that becomes one of the promising alternative, because it is made from lower quality wood that processed to be used as a more quality one. The bridge planned to be a pedestrian truss bridge with length of 9 m, width of 3 m, height of 2.5 m, and using bolt and steel plate as its connection system. Mechanical properties of LVL obtained directly from laboratory test result. Bridge modeling and planning for wood construction refers to SNI 7973:2013, while the loading refers to SNI 1725:2016. Based on the modelling and calculation, the dimension of truss frame and girder beam which are 9 cm x 9 cm and 9 cm x 18 cm have adequate strengths and satisfy deflection requirement.

  8. Deflection control system for prestressed concrete bridges by CCD camera. CCD camera ni yoru prestressed concrete kyo no tawami kanri system

    Energy Technology Data Exchange (ETDEWEB)

    Noda, Y.; Nakayama, Y.; Arai, T. (Kawada Construction Co. Ltd., Tokyo (Japan))

    1994-03-15

    For the long-span prestressed concrete bridge (continuous box girder and cable stayed bridge), the design and construction control becomes increasingly complicated as construction proceeds because of its cyclic works. This paper describes the method and operation of an automatic levelling module using CCD camera and the experimental results by this system. For this automatic levelling system, the altitude can be automatically measured by measuring the center location of gravity of the target on the bridge surface using CCD camera. The present deflection control system developed compares the measured value by the automatic levelling system with the design value obtained by the design calculation system, and manages them. From the real-time continuous measurement for the long term, in which the CCD camera was set on the bridge surface, it was found that the stable measurement accuracy can be obtained. Successful application of this system demonstrates that the system is an effective and efficient construction aid. 11 refs., 19 figs., 1 tab.

  9. Impact Coefficient Analysis of Long-Span Railway Cable-Stayed Bridge Based on Coupled Vehicle-Bridge Vibration

    Directory of Open Access Journals (Sweden)

    Yongle Li

    2015-01-01

    Full Text Available Compared with medium and small span bridges, very limited attention has been paid on the research of the impact coefficient of long-span railway bridges. To estimate the impact effects of long-span railway bridges subjected to moving vehicles, a real long-span railway cable-stayed bridge is regarded as the research object in this study, and a coupled model of vehicle-bridge system is established. The track irregularities are taken as the system excitation and the dynamic responses of the vehicle-bridge system are calculated. The impact effects on main girder, stayed cable, bearings, and bridge tower are discussed at various vehicle speeds. The results show that different components of the long-span railway cable-stayed bridge have different impact coefficients. Even for each part, the impact coefficient is also different at different local positions. It reveals that the impact coefficients in the actual situation may have significant differences with the related code clauses in the present design codes.

  10. FE-ANN based modeling of 3D simple reinforced concrete girders for objective structural health evaluation.

    Science.gov (United States)

    2017-06-01

    The structural deterioration of aging infrastructure systems and the costs of repairing these systems is an increasingly important issue worldwide. Structural health monitoring (SHM), most commonly visual inspection and condition rating, has proven t...

  11. Numerical analysis of dynamic response of vehicle–bridge coupled system on long-span continuous girder bridge

    OpenAIRE

    An, Lipeng; Li, Dejian; Yu, Peng; Yuan, Peng

    2016-01-01

    To systematically study the vehicle–bridge coupled dynamic response and its change rule with different parameters, a vehicle model with seven degrees of freedom was built and the total potential energy of vehicle space vibration system was deduced. Considering the stimulation of road roughness, the dynamic response equation of vehicle–bridge coupled system was established in accordance with the elastic system principle of total potential energy with stationary value and the “set-in-right-posi...

  12. Puente Willow Creek en Monterrey, California

    Directory of Open Access Journals (Sweden)

    Editorial, Equipo

    1965-09-01

    Full Text Available Of the 10 awards given every year by the Prestressed Concrete Institute for the most outstanding prestressed concrete projects, two have been awarded in California this year, one of them to the Willow Creek bridge, near Monterrey. The prestressed, double T girders of this bridge were made at a workshop, a great distance from the bridge site. These are 24 m long, 1.35 m high, and are stabilized by transversal diaphragms, 20 cm in thickness. The table deck is of reinforced concrete, being 8.85 m wide and 20 cm thick. The structure is straightforward, slender, and adapts itself pleasantly to the background. It has seven spans and crosses over a secondary road, in addition to bridging the Willow stream. The supporting piles are hollow, of rectangular cross section, and over them a cross beam carries the five girders and the deck itself. The end abutments consist of vertical reinforced concrete walls, and supporting, soil filled, structures. The above information was supplied by the California Road Department.De los diez premios que anualmente concede el Prestressed Concrete Institute para las obras de hormigón pretensado más notables, dos han correspondido a California y uno de ellos al puente de Willow Creek, situado en la región de Monterrey. Las vigas de hormigón pretensado, con sección en forma de doble T, se prefabricaron en un taller situado a gran distancia del puente. Tienen 24 m de longitud y 1,35 m de canto, estando arriostradas con diafragmas transversales de 20 cm de espesor. La losa del tablero, de hormigón armado, tiene 8,85 m de anchura y 20 cm de espesor. La estructura es sencilla, esbelta y armoniza perfectamente con el paisaje que la circunda. Tiene siete tramos y salva un paso inferior secundario y el arroyo Willow. Los soportes, se apoyan sobre pilotes, algunos de gran altura; son huecos, de sección rectangular y terminan en una cruceta que sirve de sostén a las cinco vigas que soportan la losa del tablero. Los estribos

  13. Effects of increasing the allowable compressive stress at release on the shear strength of prestressed concrete girders.

    Science.gov (United States)

    2008-09-01

    In recent years, several research projects have been conducted to study the feasibility of increasing the allowable : compressive stress in concrete at prestress transfer, currently defined as 0.60f'ci in the AASHTO LRFD Bridge : Design Specification...

  14. Serviceability and Prestress Loss Behavior of SCC Prestressed Concrete Girders Subjected to Increased Compressive Stresses at Release

    Science.gov (United States)

    2009-08-01

    There are limited measurements documented in the literature related to long-term prestress losses in self-consolidated concrete (SCC) members. Recorded test data has shown variations in mechanical property behavior of SCC compared to conventional HSC...

  15. Investigation of Time Series Representations and Similarity Measures for Structural Damage Pattern Recognition

    Science.gov (United States)

    Swartz, R. Andrew

    2013-01-01

    This paper investigates the time series representation methods and similarity measures for sensor data feature extraction and structural damage pattern recognition. Both model-based time series representation and dimensionality reduction methods are studied to compare the effectiveness of feature extraction for damage pattern recognition. The evaluation of feature extraction methods is performed by examining the separation of feature vectors among different damage patterns and the pattern recognition success rate. In addition, the impact of similarity measures on the pattern recognition success rate and the metrics for damage localization are also investigated. The test data used in this study are from the System Identification to Monitor Civil Engineering Structures (SIMCES) Z24 Bridge damage detection tests, a rigorous instrumentation campaign that recorded the dynamic performance of a concrete box-girder bridge under progressively increasing damage scenarios. A number of progressive damage test case datasets and damage test data with different damage modalities are used. The simulation results show that both time series representation methods and similarity measures have significant impact on the pattern recognition success rate. PMID:24191136

  16. Distillation of shale and the like. [quartz catalyst

    Energy Technology Data Exchange (ETDEWEB)

    Copp, E R

    1937-03-25

    To recover vapourizable contents from materials by low temperature distillation, the material is passed slowly through an externally heated retort containing natural quartz as a catalyzing agent and gas preheated to its critical temperature is supplied into the retort, the evolved vapours being educted and condensed. A longitudinal retort enlarging upwardly from its inlet to its outlet and containing natural quartz on supporting shelves suspended at requisite heights by means of hangers, has a furnace mounted on girders within a tank which forms a liquid seal for the retort chamber. A heating space is supplied with heating gas through pipes to externally heat the retort chamber which is heated internally by means of preheated gas admitted through branch pipes. Material is fed by screw conveyor through passage and spreader plate on to endless conveyor moving slowly along the retort floor, and is discharged through a chamber and conveyor. The vapours evolved in the retort chamber, after passing in contact with a catalyst are educted through an exit port to a condenser.

  17. Magnetic-based NDE of steel in prestressed and post-tensioned concrete bridges

    Science.gov (United States)

    Ghorbanpoor, Al

    1998-03-01

    This paper addresses a study, funded by the Federal Highway Administration (FHWA), the U.S. Department of Transportation (DOT), that is currently underway at the University of Wisconsin-Milwaukee. The objective of the study is to develop an automated non-destructive testing system based on the magnetic flux leakage principle that would allow assessment of the condition of reinforcing and prestressing steels in concrete bridge components. Corrosion or cracking of steel within concrete members will be detected and evaluated. The system will be used as a self clamping and moving sensing device that can be installed on a concrete girder. Data from the sensing device is transmitted via a wireless communication system to data recording/analysis equipment on the ground. The sensing device may also be operated manually to allow inspection of local areas such as the end bearing or cable anchorage locations in cable bridges. Through performing a correlation analysis of recorded data, an assessment of the condition of the member under test is made. Reference data base for the correlation analysis is established through laboratory and field testing with known conditions.

  18. Investigation of Time Series Representations and Similarity Measures for Structural Damage Pattern Recognition

    Directory of Open Access Journals (Sweden)

    Wenjia Liu

    2013-01-01

    Full Text Available This paper investigates the time series representation methods and similarity measures for sensor data feature extraction and structural damage pattern recognition. Both model-based time series representation and dimensionality reduction methods are studied to compare the effectiveness of feature extraction for damage pattern recognition. The evaluation of feature extraction methods is performed by examining the separation of feature vectors among different damage patterns and the pattern recognition success rate. In addition, the impact of similarity measures on the pattern recognition success rate and the metrics for damage localization are also investigated. The test data used in this study are from the System Identification to Monitor Civil Engineering Structures (SIMCES Z24 Bridge damage detection tests, a rigorous instrumentation campaign that recorded the dynamic performance of a concrete box-girder bridge under progressively increasing damage scenarios. A number of progressive damage test case datasets and damage test data with different damage modalities are used. The simulation results show that both time series representation methods and similarity measures have significant impact on the pattern recognition success rate.

  19. Aeroelastic Response from Indicial Functions with a Finite Element Model of a Suspension Bridge

    Science.gov (United States)

    Mikkelsen, O.; Jakobsen, J. B.

    2017-12-01

    The present paper describes a comprehensive analysis of the aeroelastic bridge response in time-domain, with a finite element model of the structure. The main focus is on the analysis of flutter instability, accounting for the wind forces generated by the bridge motion, including twisting as well as vertical and horizontal translation, i.e. all three global degrees of freedom. The solution is obtained by direct integration of the equations of motion for the bridge-wind system, with motion-dependent forces approximated from flutter derivatives in terms of rational functions. For the streamlined bridge box-girder investigated, the motion dependent wind forces related to the along-wind response are found to have a limited influence on the flutter velocity. The flutter mode shapes in the time-domain and the frequency domain are consistent, and composed of the three lowest symmetrical vertical modes coupled with the first torsional symmetric mode. The method applied in this study provides detailed response estimates and contributes to an increased understanding of the complex aeroelastic behaviour of long-span bridges.

  20. Second Barrel Toroid Coil Installed in ATLAS Cavern

    CERN Multimedia

    Tappern, G.

    The second barrel toroid coil was lowered into the ATLAS Cavern on Friday, 26 November. The operation takes approximately five hours of precision crane and winch operations. Before lowering, several checks are made to ensure that no loose items have been left on the coil which would fall during the lowering down the shaft. This is a very difficult, but very important check, with the first coil in position, and partly below the shaft. After changing the winch tooling on Wednesday December 1st, the coil was lifted, rotated and placed into the feet. The girders which support the coil and the Z direction stops had all been pre-set before putting the coil in the feet. The angle is controlled by an inclinometer. When the final adjustments of position have been made, which will locate the coils at the plus/minus two mm level, the connection beams (voussoirs and struts) will be put in place; this requires a complex shimming procedure. This will lock together the two coils into the feet and forms the foundation for th...

  1. Damage Detection Based on Cross-Term Extraction from Bilinear Time-Frequency Distributions

    Directory of Open Access Journals (Sweden)

    Ma Yuchao

    2014-01-01

    Full Text Available Abundant damage information is implicated in the bilinear time-frequency distribution of structural dynamic signals, which could provide effective support for structural damage identification. Signal time-frequency analysis methods are reviewed, and the characters of linear time-frequency distribution and bilinear time-frequency distribution typically represented by the Wigner-Ville distribution are compared. The existence of the cross-term and its application in structural damage detection are demonstrated. A method of extracting the dominant term is proposed, which combines the short-time Fourier spectrum and Wigner-Ville distribution; then two-dimensional time-frequency transformation matrix is constructed and the complete cross-term is extracted finally. The distribution character of which could be applied to the structural damage identification. Through theoretical analysis, model experiment and numerical simulation of the girder structure, the change rate of cross-term amplitude is validated to identify the damage location and degree. The effectiveness of the cross-term of bilinear time-frequency distribution for damage detection is confirmed and the analytical method of damage identification used in structural engineering is available.

  2. Development of a Skewed Pipe Shear Connector for Precast Concrete Structures.

    Science.gov (United States)

    Kim, Sang-Hyo; Choi, Jae-Gu; Park, Sejun; Lee, Hyunmin; Heo, And Won-Ho

    2017-05-13

    Joint connection methods, such as shear key and loop bar, improve the structural performance of precast concrete structures; consequently, there is usually decreased workability or constructional efficiency. This paper proposes a high-efficiency skewed pipe shear connector. To resist shear and pull-out forces, the proposed connectors are placed diagonally between precast concrete segments and a cast-in-place concrete joint part on a girder. Design variables (such as the pipe diameter, length, and insertion angle) have been examined to investigate the connection performance of the proposed connector. The results of our testing indicate that the skewed pipe shear connectors have 50% higher ductility and a 15% higher ratio of maximum load to yield strength as compared to the corresponding parameters of the loop bar. Finite element analysis was used for validation. The resulting validation indicates that, compared to the loop bar, the skewed pipe shear connector has a higher ultimate shear and pull-out resistance. These results indicate that the skewed pipe shear connector demonstrates more idealized behavior than the loop bar in precast concrete structures.

  3. TFTR grounding scheme and ground-monitor system

    International Nuclear Information System (INIS)

    Viola, M.

    1983-01-01

    The Tokamak Fusion Test Reactor (TFTR) grounding system utilizes a single-point ground. It is located directly under the machine, at the basement floor level, and is tied to the building perimeter ground. Wired to this single-point ground, via individual 500 MCM insulated cables, are: the vacuum vessel; four toroidal field coil cases/inner support structure quadrants; umbrella structure halves; the substructure ring girder; radial beams and columns; and the diagnostic systems. Prior to the first machine operation, a ground-loop removal program was initiated. It required insulation of all hangers and supports (within a 35-foot radius of the center of the machine) of the various piping, conduits, cable trays, and ventilation systems. A special ground-monitor system was designed and installed. It actively monitors each of the individual machine grounds to insure that there are no inadvertent ground loops within the machine structure or its ground and that the machine grounds are intact prior to each pulse. The TFTR grounding system has proven to be a very manageable system and one that is easy to maintain

  4. Buckling collapse analysis of framed structures by using adaptively shifted integration technique. Junnogata shifted intergration ho ni yoru honegumi kozo no zakutsu hokai kaiseki

    Energy Technology Data Exchange (ETDEWEB)

    Toi, Y.; Isobe, D. (The University of Tokyo, Tokyo (Japan). Institute of Industrial Science)

    1993-09-01

    This paper describes the following matters on application of an adaptively shifted integration technique to a buckling collapse analysis of framed structures: This method is a method in a finite element analysis using three-dimensional girder elements to arrange value integration points at optimal locations in a linear analysis if the elements are in an elastic transform condition on the whole. The method then moves the value integration points so that plastic hinge will occur in these locations immediately after part of the elements has yielded. The method was applied to analyzing an elastic buckling problem in several loading patterns for either a both-end supported or a one-end fixed beam member. A result was obtained that a number of elements required for one member is four at minimum. In a buckling analysis of framed structures, a satisfactory result was obtained by using an automatic element segmenting algorithm, which begins the analysis with one element one member, and immediately after a member is determined with a possibility of generation of buckling, splits that member only into four elements. 6 refs., 5 figs.

  5. Design and Construction of Operation Bridge for Research Reactor

    International Nuclear Information System (INIS)

    Jung, Kwangsub; Choi, Jinbok; Lee, Jongmin; Oh, Jinho

    2015-01-01

    The operation bridge contains a lower working deck mounted on a saddle that travels on rails. Upright members are mounted on the saddle to support the upper structure and two hoist monorails. The saddle contains an anti-derail system that is composed of seismic lugs and guide rollers. The operation bridge travels along the rails to transport the fuel assembly, irradiated object, and reactor components in the pools by using tools. Hoists are installed at the top girder. The hoist is suspended from the monorail by means of a motor driven trolley that runs along the monorail. Movements of hoist and trolley are controlled by using the control pendant switch. Processes of design and construction of the operation bridge for the research reactor are introduced. The operation bridge is designed under consideration of functions of handling equipment in the pool and operational limits for safety. Structural analysis is carried out to evaluate the structural integrity in the seismic events. Tests and inspections are also performed during fabrication and installation to confirm the function and safety of the operation bridge

  6. Sistema constructivo de tecnología intermedia como solución al problema de vivienda en las áreas marginales y socioeconómicamente deprimidas de una ciudad

    Directory of Open Access Journals (Sweden)

    Alva Mejía, Alberto

    1984-07-01

    Full Text Available The constructive system of intermediate technology offers to the population the possibility to construct his dwelling by the way of autoconstruction in stages. Its aim is to project and construct at least 10 % of the demands for housing in Lima, within a three years limit, and to support the creation of Communal Crafts Workshops. The system is to join several prefabricated elements as girders, sheets and concrete arches with vegetal fibres, wooden roof frames, etc.El sistema constructivo de tecnología intermedia ofrece a la población la posibilidad de construir su vivienda bajo la modalidad de autoconstrucción por etapas. Su meta es proyectar y construir, al menos, el 10 % de las viviendas demandadas en la actualidad en Lima con un plazo de 3 años, y apoyar la formación de talleres artesanales comunales. El sistema consiste en la unión de varios elementos prefabricados como son viguetas, láminas y arcos de hormigón con fibras vegetales, tijerales de madera, etcétera.

  7. The Septum Magnet System of the New Fast Extraction Channel of the SPS at CERN

    CERN Document Server

    Balhan, B; Rizzo, A; Weterings, W

    2004-01-01

    In the Long Straight Section LSS4 of the Super Proton Synchrotron (SPS) at CERN, a new fast extraction system has been installed in order to extract the beam to ring 2 of the Large Hadron Collider (LHC) and the CERN Neutrino to Gran Sasso facility (CNGS). The system consists of horizontal closed orbit bumper magnets, extraction kicker magnets, enlarged aperture quadrupoles and six conventional DC electromagnetic septum magnets (MSE). A protection element (TPSG) has been placed immediately upstream of the first septum coil. The septum magnets and TPSG are mounted on a single mobile retractable support girder. The MSE septa are connected by a so-called plug-in system to a rigid water-cooled bus-bar, powered by water-cooled cables. The whole system is kept at the required vacuum pressure by ion pumps attached to separate pumping modules. In this note we present the design features and parameters of the MSE septum magnets, describe the function of the related main equipment elements, briefly report on the control...

  8. Design and installation of the MSE septum system in the new LSS4 extraction channel of the SPS

    CERN Document Server

    Balhan, B; Guinand, R; Luiz, F; Rizzo, A; Weterings, W; CERN. Geneva. AB Department

    2003-01-01

    For the extraction of the beam from the Super Proton Synchrotron (SPS) to ring 2 of the Large Hadron Collider (LHC) and the CERN Neutrino to Gran Sasso (CNGS) facility, a new fast-extraction system has been installed in the long straight section LSS4 of the SPS. Besides extraction bumpers, enlarged aperture quadrupoles and extraction kicker magnets (MKE), six conventional DC septum magnets (MSE) are used. These magnets are mounted on a single mobile retractable support girder, which is motorised in order to optimise the local SPS aperture during setting up. The MSE septa are connected by a so-called plug-in system to a rigid water-cooled bus bar, which itself is powered by water-cooled cables. In order to avoid destruction of the septum magnet coils by direct impact of the extracted beam, a dilution element (TPSG) has been placed immediately upstream of the first septum coil. The whole system is kept at the required vacuum pressure by ion pumps attached to separate modules (MP). In this note we present the de...

  9. FEM simulation of static loading test of the Omega beam

    Science.gov (United States)

    Bílý, Petr; Kohoutková, Alena; Jedlinský, Petr

    2017-09-01

    The paper deals with a FEM simulation of static loading test of the Omega beam. Omega beam is a precast prestressed high-performance concrete element with the shape of Greek letter omega. Omega beam was designed as a self-supporting permanent formwork member for construction of girder bridges. FEM program ATENA Science was exploited for simulation of load-bearing test of the beam. The numerical model was calibrated using the data from both static loading test and tests of material properties. Comparison of load-displacement diagrams obtained from the experiment and the model was conducted. Development of cracks and crack patterns were compared. Very good agreement of experimental data and the FEM model was reached. The calibrated model can be used for design of optimized Omega beams in the future without the need of expensive loading tests. The calibrated material model can be also exploited in other types of FEM analyses of bridges constructed with the use of Omega beams, such as limit state analysis, optimization of shear connectors, prediction of long-term deflections or prediction of crack development.

  10. The Researches on I-beam of different web’s shapes

    Science.gov (United States)

    Shuang, Chao; Zhou, Dong Hua

    2018-05-01

    When the ratio of height to thickness of girder web is relatively high, generally the local stability of web is enhanced by setting up stiffeners. But setting up stiffeners not only increase the use of material, but also increases the welding work. Therefore, the web can be processed into trapezoid, curve, triangles and rectangle to improve its stability. In order to study the mechanical behavior of the web with different shapes and its local stable bearing capacity, the finite element analysis software ANSYS was used to analyze the six I-beam, and the stress characteristics under different web forms were obtained. The results show that the local stability bearing capacity of the I-beam is improved, especially the shape of the trapezoidal web and the shape of the curved web have a significant effect on the local stability of the I-beam. Finally, based on the study of the local stability of the trapezoidal web and the curved web, the influence of their geometrical dimensions on the local stable bearing capacity is also studied.

  11. On the building of Momoyama hydraulic power station on Kiso river. Kisogawa Momoyama suiryoku hatsudensho no kenchiku ni tsuite

    Energy Technology Data Exchange (ETDEWEB)

    Kotera, T [Nagoya University, Nagoya (Japan). Faculty of Engineering

    1991-09-30

    This paper investigates Momoyama hydraulic power station built on the middle reaches of the Kiso River in Uematsu-cho, Kiso-gun, Nagano Prefecture in Japan, in 1923 by relating to the feature of the building of the hydraulic power station and the architect, Shiro Sato. The hydraulic power station originally was a functional and industrial building which puts a priority on the efficiency of business economy, at the same time it was often required to present a beautiful appearance. The building of Momoyama hydraulic power station was founded on the crane girder structure covered with reinforced concrete(RC) walls. A Hat roof of RC slab was applied to the roof of the building. It was generally designed in Neo-Gothic style. More specifically, however, the wall surface was designed in church style and the upper part was like a castle in the middle ages. Therefore the total design was eclectic. The outer surfaces of the building were remained to be bare concrete as cast. Such a multiple building symbolizes the situation of Japanes architecture in the 1920s. 4 figs.

  12. FIP Symposium 1997 (South Africa); FIP Symposium 1997 (Minami Africa) ni sankashite

    Energy Technology Data Exchange (ETDEWEB)

    Niwano, T. [Oriental Construction Co. Ltd., Tokyo (Japan); Shinagawa, K.; Takahashi, T.

    1997-07-31

    FIP (Federation Internationale de la Precontrainte) Symposium was held in Johannesburg, South Africa. Ikeda and others were sent by the Japan Prestressed Concrete Engineering Association to participate the symposium and visit some bridges in Hong Kong and South Africa. As the keynote addresses, the trends of PC in South Africa, Europe, America, East Asia and Australia was reported. Japanese papers among 105 presented papers are as follows: Iwasaki`s `Construction method of the railway PC skew slab bridge, Natori-Gawa bridge`, Toda`s `Construction of the suspended slab bridge longest in the world, Yume Tsuri-bashi`, Iizuka`s `Experiment on earthquake characteristics of precast concrete columns` and Sugita`s `Study on concrete using high-activity rice hull ash`. The group visited Kap Shui Mun bridge (Hong Kong) of 750m long constructed by Japanese JV which is the 5-span continuous complex cable stayed bridge, and featured by PC box girder structure of side spans. The group also visited Gouritz River PC bridge in South Africa. 5 refs., 10 figs.

  13. Fatigue of cable anchorage of large cable stayed bridge; Daikibo shachokyo cable teichaku kozo no hiro

    Energy Technology Data Exchange (ETDEWEB)

    Endo, T.; Matsumoto, T. [Honshu-Shikoku Bridge Authority, Tokyo (Japan); Tsukahara, H. [Yokogawa Bridge Corp., Tokyo (Japan); Miki, C. [Tokyo Institute of Technology, Tokyo (Japan)

    1995-10-21

    Design considerations such as design schemes, the assemblage and welding of steel plates, and safety for fatigue of welded connections have to be taken for the cable anchorages of the steel cable stayed bridges. In this study, two full scale models, which have different shape of box anchorages welded to the web of the main girder, were made to investigate fatigue characteristics as well as assemblage of plate and gelding details. Finite element analyses for both test models and actual bridges here carried out to compare stress distribution. It was confirmed that the assemblage and welding of both types of box anchorage were attainable kith required quality and accuracy. According to the fatigue test, fatigue cracks originated from the weldings of the bearing plate to which the load from cable socket applied directly were caused by out-of-plane bending of the bearing plate. It was proved that the slight modifications of the details around the bearing plate resulted in sufficient fatigue strength in both types of anchorage. 1 ref., 23 figs., 2 tabs.

  14. Linear Structural Stress Analysis of a Hull Girder Penetration and a Short Longitudinal Bulkhead Using Finite Element Modeling

    National Research Council Canada - National Science Library

    Baumann, Gregg

    1997-01-01

    ... (Integrated Design Engineering Analysis Software) software. The term 'shadow zone' refers to areas of low stress concentrations that are caused by lines of stress bending around structural discontinuities...

  15. Transfer and development length of prestressing tendons in full-scale AASHTO prestressed concrete girders using self-consolidating concrete.

    Science.gov (United States)

    2009-03-01

    Self-consolidating concrete (SCC) is a highly workable concrete that flows through densely reinforced or : complex structural elements under its own weight. The benefits of using SCC include: a) Reducing labor costs : by eliminating the need for mech...

  16. Experimental and Numerical Analysis of Hull Girder Vibrations and Bow Impact of a Large Ship Sailing in Waves

    Directory of Open Access Journals (Sweden)

    Jialong Jiao

    2015-01-01

    Full Text Available It is of great importance to evaluate the hull structural vibrations response of large ships in extreme seas. Studies of hydroelastic response of an ultra large ship have been conducted with comparative verification between experimental and numerical methods in order to estimate the wave loads response considering hull vibration and water impact. A segmented self-propelling model with steel backbone system was elaborately designed and the experiments were performed in a tank. Time domain numerical simulations of the ship were carried out by using three-dimensional nonlinear hydroelasticity theory. The results from the computational analyses have been correlated with those from model tests.

  17. Economic impact of multi-span, prestressed concrete girder bridges designed as simple span versus continuous span : final report.

    Science.gov (United States)

    2016-10-01

    The objective of this study was to determine the economic impact of designing pre-tensioned prestressed concrete beam (PPCB) : bridges utilizing the continuity developed in the bridge deck as opposed to the current Iowa Department of Transportation (...

  18. Seismic fragility curves of bridge piers accounting for ground motions in Korea

    Science.gov (United States)

    Nguyen, Duy-Duan; Lee, Tae-Hyung

    2018-04-01

    Korea is located in a slight-to-moderate seismic zone. Nevertheless, several studies pointed that the peak earthquake magnitude in the region can be reached to approximately 6.5. Accordingly, a seismic vulnerability evaluation of the existing structures accounting for ground motions in Korea is momentous. The purpose of this paper is to develop seismic fragility curves for bridge piers of a steel box girder bridge equipped with and without base isolators based on a set of ground motions recorded in Korea. A finite element simulation platform, OpenSees, is utilized to perform nonlinear time history analyses of the bridges. A series of damage states is defined based on a damage index which is expressed in terms of the column displacement ductility ratio. The fragility curves based on Korean motions were thereafter compared with the fragility curves generated using worldwide earthquakes to assess the effect of the two ground motion groups on the seismic fragility curves of the bridge piers. The results reveal that both non- and base-isolated bridge piers are less vulnerable during the Korean ground motions than that under worldwide earthquakes.

  19. Scutellarin suppresses migration and invasion of human hepatocellular carcinoma by inhibiting the STAT3/Girdin/Akt activity.

    Science.gov (United States)

    Ke, Yang; Bao, Tianhao; Wu, Xuesong; Tang, Haoran; Wang, Yan; Ge, Jiayun; Fu, Bimang; Meng, Xu; Chen, Li; Zhang, Cheng; Tan, Yuqi; Chen, Haotian; Guo, Zhitang; Ni, Fan; Lei, Xuefen; Shi, Zhitian; Wei, Dong; Wang, Lin

    2017-01-29

    Scutellarin is an active flavone from Erigeron breviscapine (vant) Hand Mass. This study aimed to investigate the potential role of scutellarin in migration and invasion of human hepatocellular carcinoma (HCC) cells and its possible mechanism. In comparison with the vehicle-treated controls, treatment with scutellarin (50 mg/kg/day) for 35 days significantly mitigated the lung and intrahepatic metastasis of HCC tumors in vivo. Scutellarin treatment significantly reduced HepG2 cell viability in a dose-dependent manner, and inhibited migration and invasion of HCC cells in vitro. Scutellarin treatment significantly reduced STAT3 and Girders of actin filaments (Girdin) expression, STAT3 and Akt phosphorylation in HCC cells. Introduction of STAT3 overexpression restored the scutellarin-downregulated Girdin expression, Akt activation, migration and invasion of HCC cells. Furthermore, induction of Girdin overexpression completely abrogated the inhibition of scutellarin on the Akt phosphorylation, migration and invasion of HCC cells. Scutellarin can inhibit HCC cell metastasis in vivo, and migration and invasion in vitro by down-regulating the STAT3/Girdin/Akt signaling. Copyright © 2016 Elsevier Inc. All rights reserved.

  20. Operation of a high-gradient superconducting radio-frequency cavity with a non-evaporable getter pump

    International Nuclear Information System (INIS)

    Ciovati, G.; Geng, R.; Lushtak, Y.; Manini, P.; Maccallini, E.; Stutzman, M.

    2017-01-01

    The use of non-evaporable getter (NEG) pumps in particle accelerators has increased significantly over the past few years because of their large pumping speed, particularly for hydrogen, compared to the size of the pump. A concern about using such pumps in superconducting radio-frequency (SRF) accelerators is the possibility of shedding particulates which could then migrate into the SRF cavities and produce field emission, therefore degrading the cavity performance. One option to mitigate such issue is to use sintered getter materials which intrinsically offer superior mechanical and particle retention properties. In this article we present the results from cryogenic RF tests of a high-gradient SRF cavity after being evacuated several times with an NEG pump equipped with sintered getter disks and placed in close proximity to the cavity. The results showed that the cavity performance was not affected by the pump up to the quench gradient of 34 MV/m. As a result of this study, two such NEG pumps have been installed next to a cryomodule in the CEBAF accelerator to maintain ultra-high vacuum in the SRF cryomodule and two adjacent warm girder sections.

  1. Puente Reich, Viena - Austria

    Directory of Open Access Journals (Sweden)

    Staber, Johann

    1979-11-01

    Full Text Available The Reich Bridge substitutes for another bridge linking the centre and North areas of the city, collapsed on 8th August 1976. The purpose of this bridge is to regulate traffic and lends urban distinction to this city section. The structure is a suspended bridge, some 300 m in span, with two abutments on the banks and two piers for anchoring support. The cross section is a box girder large enough to carry motor traffic and the urban railway line.

    El puente Reich sustituye a otro anterior, derrumbado el 8 de agosto de 1976, que servía de enlace entre el centro y la parte norte de la ciudad de Viena. Debe servir para ordenar el tráfico y para realzar urbanísticamente esta zona de la ciudad. La estructura que presenta es un puente colgante de unos 300 m de luz, con dos estribos en zona de tierra y dos apoyos para los anclajes El perfil es una viga-cajón Vierendel que permite el tráfico automovilístico y el trazado del Metropolitano.

  2. A review of optimization techniques used in the design of fibre composite structures for civil engineering applications

    International Nuclear Information System (INIS)

    Awad, Ziad K.; Aravinthan, Thiru; Zhuge, Yan; Gonzalez, Felipe

    2012-01-01

    Highlights: → We reviewed existing optimization techniques of fibre composite structures. → Proposed an improved methodology for design optimization. → Comparison showed the MRDO is most suitable. -- Abstract: Fibre composite structures have become the most attractive candidate for civil engineering applications. Fibre reinforced plastic polymer (FRP) composite materials have been used in the rehabilitation and replacement of the old degrading traditional structures or build new structures. However, the lack of design standards for civil infrastructure limits their structural applications. The majority of the existing applications have been designed based on the research and guidelines provided by the fibre composite manufacturers or based on the designer's experience. It has been a tendency that the final structure is generally over-designed. This paper provides a review on the available studies related to the design optimization of fibre composite structures used in civil engineering such as; plate, beam, box beam, sandwich panel, bridge girder, and bridge deck. Various optimization methods are presented and compared. In addition, the importance of using the appropriate optimization technique is discussed. An improved methodology, which considering experimental testing, numerical modelling, and design constrains, is proposed in the paper for design optimization of composite structures.

  3. Articularities of Analysis and Behaviour of Concrete Beams Reinforced with Fibrous Polymer Composite Bars

    Directory of Open Access Journals (Sweden)

    N. Ţăranu

    2006-01-01

    Full Text Available Traditional steel based reinforcement systems for concrete elements are facing with serious problems mainly caused by corrosion due to chemically aggressive environments and salts used in deicing procedures, especially in case of bridge steel reinforced concrete girders. Also in some cases special applications require structural members with magnetic transparency. An alternative to this major problem has recently become the use of fiber reinforced polymer (FPR composite bars as internal reinforcement for concrete beams. The particularities of their mechanical properties are making the design process a difficult task for engineers, numerous research centers being involved in correcting this situation. The general aspects concerning the conceiving of FR.P reinforced concrete beams are firstly analyzed, compared to those reinforced with steel bars. Some results of a Finite Element Analysis, as part of a complex program which also implies full scale testing of FRP reinforced beams subjected to bending, are given and discussed in the paper. The low elasticity modulus presented by glass fiber reinforced polymer (GFRP bars does not justify its use from structural point of view when deflection is the limiting condition but for corrosive resistance reasons and special electromagnetic properties this system can be promoted.

  4. Large scale testing of nitinol shape memory alloy devices for retrofitting of bridges

    International Nuclear Information System (INIS)

    Johnson, Rita; Emmanuel Maragakis, M; Saiid Saiidi, M; Padgett, Jamie E; DesRoches, Reginald

    2008-01-01

    A large scale testing program was conducted to determine the effects of shape memory alloy (SMA) restrainer cables on the seismic performance of in-span hinges of a representative multiple-frame concrete box girder bridge subjected to earthquake excitations. Another objective of the study was to compare the performance of SMA restrainers to that of traditional steel restrainers as restraining devices for reducing hinge displacement and the likelihood of collapse during earthquakes. The results of the tests show that SMA restrainers performed very well as restraining devices. The forces in the SMA and steel restrainers were comparable. However, the SMA restrainer cables had minimal residual strain after repeated loading and exhibited the ability to undergo many cycles with little strength and stiffness degradation. In addition, the hysteretic damping that was observed in the larger ground accelerations demonstrated the ability of the materials to dissipate energy. An analytical study was conducted to assess the anticipated seismic response of the test setup and evaluate the accuracy of the analytical model. The results of the analytical simulation illustrate that the analytical model was able to match the responses from the experimental tests, including peak stresses, strains, forces, and hinge openings

  5. An analytical method to assess the damage and predict the residual strength of a ship in a shoal grounding accident scenario

    Directory of Open Access Journals (Sweden)

    Sun Bin

    2016-04-01

    Full Text Available In this paper, a simplified analytical method used to predict the residual ultimate strength of a ship hull after a shoal grounding accident is proposed. Shoal grounding accidents always lead to severe denting, though not tearing, of the ship bottom structure, which may threaten the global hull girder resistance and result in even worse consequences, such as hull collapse. Here, the degree of damage of the bottom structure is predicted by a series of analytical methods based on the plastic-elastic deformation mechanism. The energy dissipation of a ship bottom structure is obtained from individual components to determine the sliding distance of the seabed obstruction. Then, a new approach to assess the residual strength of the damaged ship subjected to shoal grounding is proposed based on the improved Smith's method. This analytical method is verified by comparing the results of the proposed method and those generated by numerical simulation using the software ABAQUS. The proposed analytical method can be used to assess the safety of a ship with a double bottom during its design phase and predict the residual ultimate strength of a ship after a shoal grounding accident occurs.

  6. Operation of a high-gradient superconducting radio-frequency cavity with a non-evaporable getter pump

    Energy Technology Data Exchange (ETDEWEB)

    Ciovati, G., E-mail: gciovati@jlab.org [Thomas Jefferson National Accelerator Facility, Newport News, VA 23606 (United States); Geng, R. [Thomas Jefferson National Accelerator Facility, Newport News, VA 23606 (United States); Lushtak, Y.; Manini, P.; Maccallini, E. [SAES Getters, S.p.A, Viale Italia, 77, 20020 Lainate, MI (Italy); Stutzman, M. [Thomas Jefferson National Accelerator Facility, Newport News, VA 23606 (United States)

    2017-01-11

    The use of non-evaporable getter (NEG) pumps in particle accelerators has increased significantly over the past few years because of their large pumping speed, particularly for hydrogen, compared to the size of the pump. A concern about using such pumps in superconducting radio-frequency (SRF) accelerators is the possibility of shedding particulates which could then migrate into the SRF cavities and produce field emission, therefore degrading the cavity performance. One option to mitigate such issue is to use sintered getter materials which intrinsically offer superior mechanical and particle retention properties. In this article we present the results from cryogenic RF tests of a high-gradient SRF cavity after being evacuated several times with an NEG pump equipped with sintered getter disks and placed in close proximity to the cavity. The results showed that the cavity performance was not affected by the pump up to the quench gradient of 34 MV/m. As a result of this study, two such NEG pumps have been installed next to a cryomodule in the CEBAF accelerator to maintain ultra-high vacuum in the SRF cryomodule and two adjacent warm girder sections.

  7. Reliability Analysis of a Steel Frame

    Directory of Open Access Journals (Sweden)

    M. Sýkora

    2002-01-01

    Full Text Available A steel frame with haunches is designed according to Eurocodes. The frame is exposed to self-weight, snow, and wind actions. Lateral-torsional buckling appears to represent the most critical criterion, which is considered as a basis for the limit state function. In the reliability analysis, the probabilistic models proposed by the Joint Committee for Structural Safety (JCSS are used for basic variables. The uncertainty model coefficients take into account the inaccuracy of the resistance model for the haunched girder and the inaccuracy of the action effect model. The time invariant reliability analysis is based on Turkstra's rule for combinations of snow and wind actions. The time variant analysis describes snow and wind actions by jump processes with intermittencies. Assuming a 50-year lifetime, the obtained values of the reliability index b vary within the range from 3.95 up to 5.56. The cross-profile IPE 330 designed according to Eurocodes seems to be adequate. It appears that the time invariant reliability analysis based on Turkstra's rule provides considerably lower values of b than those obtained by the time variant analysis.

  8. Analysis of the Shear Behavior of Stubby Y-Type Perfobond Rib Shear Connectors for a Composite Frame Structure.

    Science.gov (United States)

    Kim, Sang-Hyo; Kim, Kun-Soo; Lee, Do-Hoon; Park, Jun-Seung; Han, Oneil

    2017-11-22

    Shear connectors are used in steel beam-concrete slabs of composite frame and bridge structures to transfer shear force according to design loads. The existing Y-type perfobond rib shear connectors are designed for girder slabs of composite bridges. Therefore, the rib and transverse rebars of the conventional Y-type perfobond rib shear connectors are extremely large for the composite frames of building structures. Thus, this paper proposes stubby Y-type perfobond rib shear connectors, redefining the existing connectors, for composite frames of building structures; these were used to perform push-out tests. These shear connectors have relatively small ribs compared to the conventional Y-type perfobond rib shear connectors. To confirm the shear resistance of these stubby shear connectors, we performed an experiment by using transverse rebars D13 and D16. The results indicate that these shear connectors have suitable shear strength and ductility for application in composite frame structures. The shear strengths obtained using D13 and D16 were not significantly different. However, the ductility of the shear connectors with D16 was 45.1% higher than that of the shear connectors with D13.

  9. Application study on the first cable-stayed bridge with CFRP cables in China

    Directory of Open Access Journals (Sweden)

    Kuihua Mei

    2015-08-01

    Full Text Available In order to push forward the development of CFRP cable-stayed bridge and accumulate experiences, the study on the application of the first cable-stayed bridge with CFRP cables in China was carried out. The design essentials of main components of the bridge were introduced and its integral performances, including static properties, dynamic properties and seismic response were analyzed using finite element method. A new bond-type anchorage was developed and the processes of fabricating and installing CFRP cables were elaborated. Based on the results of construction simulation, a tension scheme for bridge was propound. During constructing, the stresses and displacement of girder and pylon, as well as the forces and stresses of cables, were tested. The results indicate that all sections of the bridge could meet the requirements of the ultimate bearing capacity and normal service; the performance of the anchorage is good and the stresses in each cable system are similar; the tested values accord well with the calculated values. Further, creep deformation of the resin in anchorages under service load is not obvious. All these results demonstrate that the first application of CFRP cables in the cable-stayed bridge in China is successful.

  10. Developing mathematical models to predict tensile properties of pulsed current gas tungsten arc welded Ti-6Al-4V alloy

    International Nuclear Information System (INIS)

    Balasubramanian, M.; Jayabalan, V.; Balasubramanian, V.

    2008-01-01

    Titanium (Ti-6Al-4V) alloy has gathered wide acceptance in the fabrication of light weight structures requiring a high strength-to-weight ratio, such as transportable bridge girders, military vehicles, road tankers and railway transport systems. The preferred welding process of titanium alloy is frequently gas tungsten arc (GTA) welding due to its comparatively easier applicability and better economy. In the case of single pass GTA welding of thinner section of this alloy, the pulsed current has been found beneficial due to its advantages over the conventional continuous current process. Many considerations come into the picture and one need to carefully balance various pulse current parameters to arrive at an optimum combination. Hence, in this investigation an attempt has been made to develop mathematical models to predict tensile properties of pulsed current GTA welded titanium alloy weldments. Four factors, five level, central composite, rotatable design matrix is used to optimise the required number of experiments. The mathematical models have been developed by response surface method (RSM). The adequacy of the models has been checked by ANOVA technique. By using the developed mathematical models, the tensile properties of the joints can be predicted with 99% confidence level

  11. Developing mathematical models to predict tensile properties of pulsed current gas tungsten arc welded Ti-6Al-4V alloy

    Energy Technology Data Exchange (ETDEWEB)

    Balasubramanian, M. [Department of Production Engineering, Sathyabama University, Old Mamallapuram Road, Chennai 600 119 (India)], E-mail: manianmb@rediffmail.com; Jayabalan, V. [Department of Manufacturing Engineering, Anna University, Guindy, Chennai 600 025 (India)], E-mail: jbalan@annauniv.edu; Balasubramanian, V. [Department of Manufacturing Engineering, Annamalai University, Annamalai Nagar 608 002 (India)], E-mail: visvabalu@yahoo.com

    2008-07-01

    Titanium (Ti-6Al-4V) alloy has gathered wide acceptance in the fabrication of light weight structures requiring a high strength-to-weight ratio, such as transportable bridge girders, military vehicles, road tankers and railway transport systems. The preferred welding process of titanium alloy is frequently gas tungsten arc (GTA) welding due to its comparatively easier applicability and better economy. In the case of single pass GTA welding of thinner section of this alloy, the pulsed current has been found beneficial due to its advantages over the conventional continuous current process. Many considerations come into the picture and one need to carefully balance various pulse current parameters to arrive at an optimum combination. Hence, in this investigation an attempt has been made to develop mathematical models to predict tensile properties of pulsed current GTA welded titanium alloy weldments. Four factors, five level, central composite, rotatable design matrix is used to optimise the required number of experiments. The mathematical models have been developed by response surface method (RSM). The adequacy of the models has been checked by ANOVA technique. By using the developed mathematical models, the tensile properties of the joints can be predicted with 99% confidence level.

  12. Ultimate strength analysis of long-span cable-stayed bridges; Chodai chachokyo no shukyoku kyodo kaiseki to kyodo ni kansuru ichikosatsu

    Energy Technology Data Exchange (ETDEWEB)

    Xie, X.; Yamaguchi, H. [Saitama Univ., Urawa (Japan)] Nagai, M. [Nagaoka Technical Coll., Niigata (Japan)

    1998-07-21

    Recently, span of cable-stayed bridges has been getting loner and longer, present situation is that cable-stayed bridges with span 600 to 800m class have been built inside and outside the country, and accurate determination of its ultimate strength has been an important problem statistically. However, concrete design method for evaluating load bearing stress of long-span cable-stayed bridge. Particularly of the main beam whose axial stress is dominating, has not been established so far. As for cable-stayed bridge, even for long-span, effect of plasticization of cross section on ultimate strength is severe because there is little effect of geometric nonlinearity and it is thought that accurate evaluation of ultimate strength only by elastic finite potential analysis is difficult. Accordingly, it is necessary to study the behavior by using combined nonlinear analysis considering the nonlinearity of the material in order to evaluate the safety and economy to long-span cable-stayed bridge. In this report, 3 dimensional analysis method was formularized taking into account the combine nonlinearity of multi-box girder and analysis program of ultimate strength behavior of long-span cable-stayed bridge was developed. 19 refs., 17 figs., 2 tabs.

  13. Energy-based damping evaluation of cable-stayed bridges and its application to Tsurumi Tsubasa bridge; Shachokyo shindo gensui no energy teki hyokaho to Tsurumi Tsubasakyo eno tekiyo

    Energy Technology Data Exchange (ETDEWEB)

    Yamaguchi, H. [Saitama University, Saitama (Japan). Faculty of Engineering; Takano, H.; Ogasawara, M.; Shimosato, T. [Metropolitan Expressway Public Corp., Tokyo (Japan); Kato, M.; Kato, H. [NKK Corp., Tokyo (Japan)

    1996-07-21

    This paper provides and discusses a more common energy-based evaluation method of vibration damping in cable-stayed bridges. This method was applied to data obtained from the field vibration test of the Tsurumi Tsubasa Bridge. The damping was defined as dissipation energy in one cycle against the total potential energy. The dissipation energy from shoe friction, aerodynamic damping, and dampers for cables was added to the method proposed by Yamaguchi, et. al., in which the energy of girders, towers, and cables were quantitated, and the dissipation energy was determined from the loss factor of each constituent, to evaluate the damping of whole bridge. Thus, a more common energy-based evaluation method was provided. This method was applied to the damping obtained from the field vibration test of Tsurumi Tsubasa Bridge. Consequently, it was found that the damping of whole bridge was significantly affected by the shoe friction, aerodynamic damping, and dampers for cables. Distinguished damping characteristics of the Tsurumi Tsubasa Bridge could be explained by the energy-based evaluation. Validity of the energy-based evaluation method for damping of cable-stayed bridges was demonstrated. 15 refs., 9 figs., 6 tabs.

  14. A new multiconstraint method for determining the optimal cable stresses in cable-stayed bridges.

    Science.gov (United States)

    Asgari, B; Osman, S A; Adnan, A

    2014-01-01

    Cable-stayed bridges are one of the most popular types of long-span bridges. The structural behaviour of cable-stayed bridges is sensitive to the load distribution between the girder, pylons, and cables. The determination of pretensioning cable stresses is critical in the cable-stayed bridge design procedure. By finding the optimum stresses in cables, the load and moment distribution of the bridge can be improved. In recent years, different research works have studied iterative and modern methods to find optimum stresses of cables. However, most of the proposed methods have limitations in optimising the structural performance of cable-stayed bridges. This paper presents a multiconstraint optimisation method to specify the optimum cable forces in cable-stayed bridges. The proposed optimisation method produces less bending moments and stresses in the bridge members and requires shorter simulation time than other proposed methods. The results of comparative study show that the proposed method is more successful in restricting the deck and pylon displacements and providing uniform deck moment distribution than unit load method (ULM). The final design of cable-stayed bridges can be optimised considerably through proposed multiconstraint optimisation method.

  15. A New Multiconstraint Method for Determining the Optimal Cable Stresses in Cable-Stayed Bridges

    Directory of Open Access Journals (Sweden)

    B. Asgari

    2014-01-01

    Full Text Available Cable-stayed bridges are one of the most popular types of long-span bridges. The structural behaviour of cable-stayed bridges is sensitive to the load distribution between the girder, pylons, and cables. The determination of pretensioning cable stresses is critical in the cable-stayed bridge design procedure. By finding the optimum stresses in cables, the load and moment distribution of the bridge can be improved. In recent years, different research works have studied iterative and modern methods to find optimum stresses of cables. However, most of the proposed methods have limitations in optimising the structural performance of cable-stayed bridges. This paper presents a multiconstraint optimisation method to specify the optimum cable forces in cable-stayed bridges. The proposed optimisation method produces less bending moments and stresses in the bridge members and requires shorter simulation time than other proposed methods. The results of comparative study show that the proposed method is more successful in restricting the deck and pylon displacements and providing uniform deck moment distribution than unit load method (ULM. The final design of cable-stayed bridges can be optimised considerably through proposed multiconstraint optimisation method.

  16. Design, fabrication and erection of Queen Mall Bridge; Queen mall kyo no sekkei seisaku kasetsu

    Energy Technology Data Exchange (ETDEWEB)

    Arai, M.; Ishii, A.; Shinohara, T. [Sumitomo Heavy Industries, Ltd., Tokyo (Japan)

    1997-12-20

    This paper describes design, fabrication and erection of Queen Mall Bridge, which is a new landmark in Minato-Mirai Yokohama. This bridge is two-span continuous cable stayed pedestrian bridge with a roof, and has a length 72.2 m, a width 18 m and a weight about 1,050 t. This bridge connects between the Queen`s Square and the second floor of Pacifico Yokohama. Achieving harmonious impression of the newly designed bridge in this area, glass roof was employed and all-weld method was applied to the in-site jointing of main girders and main tower in addition to the essential structural design. Since all-weld method was applied to the in-site jointing, highly accurate fabrication was considered during the in-site jointing. Due to the heavy traffic of the road below the bridge, the erection time was shortened under the severe erection conditions at night by large block method. Especially, accuracy control was considered for the whole shape management. Pre-assemble of all members was conducted just near the erection site, only 500 m away from the site, to shorten the construction time. 1 ref., 5 figs.

  17. Local beam position feedback experiments on the ESRF storage ring

    International Nuclear Information System (INIS)

    Chung, Y.; Kahana, E.; Kirchman, J.

    1995-01-01

    This paper describes the results of local beam position feedback experiments conducted on the ESRF storage ring using digital signal processing (DSP) under the trilateral agreement of collaboration among ESRF, APS, and SPring-8. Two rf beam position monitors (BPMS) in the, upstream and downstream of the insertion device (ID) and two x-ray BPMs in the sixth cell were used to monitor the electron beam and the x-ray beam emitted from the ID, respectively. The local bump coefficients were obtained using the technique of singular value decomposition (SVD) on the global response matrix for the bump magnets and all the available BPMs outside the local bump. The local response matrix was then obtained between the two three-magnet bumps and the position monitors. The data sampling frequency was 4 kHz and a proportional, integral, and derivative (PID) controller was used. The result indicates the closed-loop feedback bandwidth close to 100 Hz and clear attenuation (∼ -40 dB) of the 7-Hz beam motion due to girder vibration resonance. Comparison of the results using the rf BPMs and x-ray BPMs will be also discussed

  18. Simulation Study on Train-Induced Vibration Control of a Long-Span Steel Truss Girder Bridge by Tuned Mass Dampers

    Directory of Open Access Journals (Sweden)

    Hao Wang

    2014-01-01

    Full Text Available Train-induced vibration of steel truss bridges is one of the key issues in bridge engineering. This paper talks about the application of tuned mass damper (TMD on the vibration control of a steel truss bridge subjected to dynamic train loads. The Nanjing Yangtze River Bridge (NYRB is taken as the research object and a recorded typical train load is included in this study. With dynamic finite element (FE method, the real-time dynamic responses of NYRB are analyzed based on a simplified train-bridge time-varying system. Thereinto, two cases including single train moving at one side and two trains moving oppositely are specifically investigated. According to the dynamic characteristics and dynamic responses of NYRB, the fourth vertical bending mode is selected as the control target and the parameter sensitivity analysis on vibration control efficiency with TMD is conducted. Using the first-order optimization method, the optimal parameters of TMD are then acquired with the control efficiency of TMD, the static displacement of Midspan, expenditure of TMDs, and manufacture difficulty of the damper considered. Results obtained in this study can provide references for the vibration control of steel truss bridges.

  19. Economic impact of multi-span, prestressed concrete girder bridges designed as simple span versus continuous span : tech transfer summary.

    Science.gov (United States)

    2016-10-01

    The objective of this study was to determine the economic impact of : designing pre-tensioned prestressed concrete beam (PPCB) bridges : utilizing the continuity developed in the bridge deck as opposed to the : current Iowa Department of Transportati...

  20. Edificio del Congreso Bad-Gastein – Austria

    Directory of Open Access Journals (Sweden)

    Garstenauer, G.

    1975-06-01

    Full Text Available One of the most outstanding characteristics of this Congress Centre is its great adaptation to the hilly ground on which it is situated occupying a very small area and having successfully solved the problem of a difference of elevation of 50%. The entrance to the building is on the top floor, placed at the level of the street that limits the plot in its highest section. On this floor, which is covered by a transitable terrace, are the various offices and premises for the use of the congress members. Below the entrance level is the technical floor which holds all the installations of the building and immediately below this floor is the great congress hall in two levels and with a varying capacity of 800 to 1,500 persons. Finally, two storeys, situated in the lowest part of the building, are reserved for storage rooms, and garages. The construction has almost entirely been carried out by means of prefabricated members, out of which the most important ones are: columns with square cross-section, with big supporting heads that support an approximate load of 2,000 t; the girder in the shape of an inverted T; and the double ceilings of prefabricated plates which by means of concrete foundations rest upon the caisson ceiling in squares of double web girders.Una de las características más sobresalientes de este Centro de Congresos es su gran adaptación al accidentado terreno en el que se encuentra enclavado, de superficie muy reducida y con un desnivel que supera el 50%. El acceso al edificio se efectúa por la planta superior, situada a nivel de la calle que limita la parcela en su parte más alta. En esta planta, cubierta por una terraza transitable, se han dispuesto diversas oficinas y locales para uso de los congresistas. Por debajo del nivel de entrada se encuentra la planta técnica, que agrupa todas las instalaciones del edificio, e inmediatamente debajo de ella, el gran salón de congresos, en dos niveles y con capacidad variable