  1. Radioactive waste management for German nuclear power plants

    International Nuclear Information System (INIS)

    Weh, R.; Methling, D.; Sappok, M.

    1996-01-01

    In Germany, back-end fuel cycle provisions must be made for the twenty nuclear power plants currently run by utilities with an aggregate installed power of 23.4 GWe, and the four nuclear power plants already shut down. In addition, there are the shut down nuclear power plants of the former German Democratic Republic, and a variety of decommissioned prototype nuclear power plants built with the participation of the federal government and by firms other than utilities. The nuclear power plants operated by utilities contribute roughly one third of the total electricity generation in public power plants, thus greatly ensuring a stable energy supply in Germany. The public debate in Germany, however, focuses less on the good economic performance of these plants, and the positive acceptance at their respective sites, but rather on their spent fuel and waste management which, allegedly, is not safe enough. The spent fuel and waste management of German nuclear power plants is planned on a long-term basis, and executed in a responsible way by proven technical means, in the light of the provisions of the Atomic Act. Each of the necessary steps of the back end of the fuel cycle is planned and licensed in accordance with German nuclear law provisions. The respective facilities are built, commissioned, and monitored in operation with the dedicated assistance of expert consultants and licensing authorities. Stable boundary conditions are a prerequisite in ensuring the necessary stability in planning and running waste management schemes. As producers of waste, nuclear power plants are responsible for safe waste management and remain the owners of that waste until it has been accepted by a federal repository. (orig./DG) [de

  2. Topical problems of the German electric power industry

    Energy Technology Data Exchange (ETDEWEB)

    Boeck, H [Stadtwerke Hannover A.G. (Germany, F.R.); Worm, N [Hannover-Braunschweigische Stromversorgungs-A.G., Hannover (Germany, F.R.); Brohmeyer, M [Schleswig-Holsteinische Stromversorgungs A.G., Rendsburg (Germany, F.R.). Abt. Anwendungstechnik und Beratung; Deuster, G [Energieversorgung Oberhausen A.G. (Germany, F.R.); Heitzer, H; Holzer, J [Bayernwerk A.G., Muenchen (Germany, F.R.); Deparade, K [Verband der Energie-Abnehmer e.V., Hannover (Germany, F.R.); Marnet, C [Stadtwerke Duesseldorf A.G. (Germany, F.R.); Oberlack, H W [Hamburgische Electricitaets-Werke A.G. (Germany, F.R.); Segatz, U [Preussische Elektrizitaets-A.G. (Preussenelektra), Hannover (Germany, F.R.)

    1978-06-01

    On the occasion of the general meeting of the VDE high-ranking personalities of the German Power Supply Industry were interviewed on current affairs. The following subjects were discussed: (1) problems involved in energy policy; (2) energy problems due to newly formed regions; (3) utilization of electric power in agriculture; (4) development prospects of district heating; (5) problems of power generation far from coal districts; (6) rationalization in the commercial sector; (7) opportunities and limits of industrial combined heat and power generation; (8) environmental protection and electric power supply; (9) possible utilization of imported coal; and (10). assuring the primary energy basis for electric power supply.

  3. On the spatial hedging effectiveness of German wind power futures for wind power generators

    DEFF Research Database (Denmark)

    Christensen, Troels Sønderby; Pircalabu, Anca

    2018-01-01

    The wind power futures recently introduced on the German market fill the gap of a standardized product that addresses directly the volume risk in wind power trading. While the German wind power futures entail risk-reducing benefits for wind power generators generally speaking, it remains unclear...... the extent of these benefits across wind farms with different geographical locations. In this paper, we consider the wind utilization at 31 different locations in Germany, and for each site, we propose a copula model for the joint behavior of the site-specific wind index and the overall German wind index....... Our results indicate that static mixture copulas are preferred to the stand-alone copula models usually employed in the economic literature. Further, we find evidence of asymmetric dependence and upper tail dependence. To quantify the benefits of wind power futures at each wind site, we perform...

  4. German power options: Lack of clarity will be costly

    International Nuclear Information System (INIS)

    Schuelke, Christian

    2010-01-01

    The German environment minister Norbert Roettgen (CDU) revived the German debate about the future of nuclear power in February when he argued for a limited lifetime extension of Germany's nuclear plants. His statements created much dissent in his own party and with the coalition partner FDP. The government will not take a formal decision before the autumn, but the contradicting messages from inside the government send highly ambiguous signals to electricity utilities with investment plans in Germany. What does the German government want the companies to do?

  5. Business model innovation for sustainable energy: German utilities and renewable energy

    International Nuclear Information System (INIS)

    Richter, Mario

    2013-01-01

    The electric power sector stands at the beginning of a fundamental transformation process towards a more sustainable production based on renewable energies. Consequently, electric utilities as incumbent actors face a massive challenge to find new ways of creating, delivering, and capturing value from renewable energy technologies. This study investigates utilities' business models for renewable energies by analyzing two generic business models based on a series of in-depth interviews with German utility managers. It is found that utilities have developed viable business models for large-scale utility-side renewable energy generation. At the same time, utilities lack adequate business models to commercialize small-scale customer-side renewable energy technologies. By combining the business model concept with innovation and organization theory practical recommendations for utility mangers and policy makers are derived. - Highlights: • The energy transition creates a fundamental business model challenge for utilities. • German utilities succeed in large-scale and fail in small-scale renewable generation. • Experiences from other industries are available to inform utility managers. • Business model innovation capabilities will be crucial to master the energy transition

  6. The availability of German nuclear power plants in an international comparison

    International Nuclear Information System (INIS)

    Fehndrich, W.; Kutsch, W.

    1975-01-01

    The availability of German nuclear power stations is discussed in comparison with European and American light-water nuclear power stations. Furthermore, the availability or utilization is shown as a function of the year of operation and of the unit size (the latter only for the USA), and the trends observed during the last 4 years are made evident. The unscheduled shutdowns of light-water nuclear power stations during the past 4 years are analysed on the basis of publications of the IAEA in Vienna and the ABE-Committees of the German Atomforum with special emphasis on the affected systems. (orig.) [de

  7. On-site storage of spent nuclear fuel assemblies in German nuclear power plants

    International Nuclear Information System (INIS)

    Banck, J.

    1999-01-01

    The selection of back-end strategies for spent fuel assemblies is influenced by a number of different factors depending on the given situation in any specific country. In Germany, the back-end strategy implemented in the past was almost exclusively reprocessing. This strategy was required by the German Atomic Energy Act. Since 1994, when the Atomic Energy Act was amended, the option of direct final disposal has been granted the equivalent status by law to that afforded to reprocessing (and reuse of valuable materials). As a result, German utilities may now choose between these two alternatives. Another important condition for optimizing the back-end policy is the fact that fuel cycle costs in Germany are directly dependent on spent fuel volumes (in contrast to the US, for example, such costs are related to the amount of power generated). Another boundary condition for German utilities with respect to spent fuel management is posed by the problems with militant opponents of nuclear energy during transportation of spent fuel to interim storage sites. These facts have given rise to a reconsideration of the fuel cycle back-end, which has resulted in a change in strategy by most German utilities in favour of the following: Preference for long-term storage and maximized use of on-site storage capacity; Reduction in the amount of spent fuel by increasing burnup as much as possible. These decisions have also been driven by the deregulation of energy markets in Europe, where utilities are now permitted to sell electric power to consumers beyond their original supply network and must therefore offer electric power on a very cost competitive basis. (author)

  8. Basic criteria and application examples of German utility PLIM concept

    International Nuclear Information System (INIS)

    Sgarz, G.; Metzner, K.J.

    2002-01-01

    As a consequence of the consensus negotiations between the present Federal German Government and the German utilities the new Atomic Energy Law was set into force in April 2002. The main issues are: 1. Phase out of NPP-operation after a maximum lifetime of 32 years without any claims for compensation. 2. Termination of spent fuel reprocessing and switching over to direct final storage. Stop of spent fuel casks shipment in 2005. 3. Intermediate storage facilities are to be provided on each power plant site. 4. The promotion clause for nuclear energy is cancelled, the construction of new NPP's is prohibited. 5. The NPP safety status has to be kept on a high level standard. A periodic safety assessment must be performed 'according to the state of the art' based on up-to-date codes and standards in a 10-year interval. As a consequence, the future German policies and strategies are based on this law

  9. Project GeoPower: Basic subsurface information for the utilization of geothermal energy in the Danish-German border region

    DEFF Research Database (Denmark)

    Kirsch, Reinhard; Balling, Niels; Fuchs, Sven

    and require reliable cross-border management and planning tools. In the framework of the Interreg4a GeoPower project, fundamental geological and geophysical information of importance for the planning of geothermal energy utilization in the Danish-German border region was compiled and analyzed. A 3D geological......Information on both hydraulic and thermal conditions of the subsurface is fundamental for the planning and use of hydrothermal energy. This is paramount in particular for densely populated international border regions, where different subsurface applications may introduce conflicts of use...... on potential geothermal reservoirs, and a new 3D structural geological model was developed. The interpretation of petrophysical data (core data and well logs) allows to evaluate the hydraulic and thermal rock properties of geothermal formations and to develop a parameterized 3D thermal conductive subsurface...

  10. The German-German history of the nuclear power plant Greifswald. Nuclear power between east and west. 2. ed.

    International Nuclear Information System (INIS)

    Hoegselius, Per

    2015-01-01

    The historical study covers the chapters The nuclear power plant Greifswald; Lubmin shortly before the ''Wende'' 1989; the German ''Wende''; from the last vote for the ''Volkskammer (parliament of the German Democratic Republic) to the German reunification; Lubmin in reunified Germany; conclusions and perspectives. In the attachment technical data about the reactors WWER-440/W-230 are summarized, including a list of WWERs in the former eastern bloc countries.

  11. Organization of the German nuclear industry

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    Corporate ownership within the German nuclear industry has evolved constantly during the last decade, and recent acquisitions and mergers, reunification of the country, as well as preparation for a unified European power market, have led to many significant changes during the past two years. The country's nuclear industry continues to struggle under an increasingly anti-nuclear political environment, yet nuclear power provided more than one-third of Germany's total electricity generation in 1991. As in many countries, particularly in western Europe, many German companies involved in different facets of the nuclear industry are interrelated. Usually as a means of horizontal or vertical integration, the country's nuclear utilities own, directly or indirectly, shares in uranium mining projects; conversion, enrichment, and fabrication companies; or other utilities' nuclear power plants. The utilities own partial interests in companies in supporting industries as well, including transportation firms, waste management companies, uranium broker/traders, and nuclear equipment manufacturers. While the majority of the companies owned are German, numerous investments are made in non-German firms also

  12. Longer operating times of nuclear power plants. Options for compensating public utility advantages

    International Nuclear Information System (INIS)

    Bode, Sven; Kondziella, Hendrik; Bruckner, Thomas

    2010-01-01

    The current German government of CDU/CSU and FDP intends to prolong the operating time of existing nuclear power plants in Germany. The advantages resulting for public utilities are to be compensated. The authors discuss how compensation may be achieved and outline the available instruments. (orig.)

  13. The German Navy: From World Power to Alliance Power

    Science.gov (United States)

    2013-12-01

    national policy and naval strategy in the case of a non- Anglo - Saxon continental power with world standing. An analysis of such phenomena has great...conjunction, a naval strategy more fitting to the geo-strategic realities of this central-European non- Anglo - Saxon power—a course that proved hardly...38   2.   The Anglo -German Naval Agreement ............................................ 41   D

  14. Competition on the weg: Product strategies of German utilities; Wettbewerb per Internet. Produktstrategien deutscher Stromversorger

    Energy Technology Data Exchange (ETDEWEB)

    Franke-Ewald, Andreas [Ernst und Young AG, Duesseldorf (Germany)

    2009-01-15

    Deregulation and regulation of the energy markets pose enormous challenges to German utilities. Further, consumer consultants and internet portals make it easier for consumers to find the best buy, which in turn enhances competition. An attractive online representation makes it possible for utilities to acquire new customers and satisfy regular ones. A current study analysed the web pages of German utilities with the intention to get a picture of the innovative capacity of the product range on offer to private customers. It was found that there is still vast room for improvement. (orig.)

  15. The German risk study for nuclear power plants

    International Nuclear Information System (INIS)

    Birkhofer, A.

    1980-01-01

    In August 1979 results of the ''German Risk Study for Nuclear Power Plants'' were published. The Main Report, in which approach and results of the study are documented, has been available since the end of 1979. It was the charter of the study - which was performed on behalf of the Minister of Research and Technology of the Federal Republic of Germany - to apply as far as possible the methods of the US Reactor Safety Study (WASH-1400) to German plant and site conditions. A direct transfer of the results was not deemed justified, mainly for the following reasons: There is quite a number of differences between the design of the reference plants of WASH-1400 (Surry-1, Peach Bottom-2) and German nuclear power plants. The mean population density in the Federal Republic of Germany is more than ten times of the United States. In the vicinity of nuclear power plants the ratio is about 3:1. To calculate the collective risk resulting from reactor accidents, a total of 25 plants at 19 different sites in the Federal Republic of Germany were considered. This included all plants with 600 MW or more electrical output, which were in operation, under construction or in licensing process by July 1, 1977. As an approximation to the real situation, it has been assumed that all 25 plants are technically identical to the reference plant

  16. Structure of the German electricity industry

    International Nuclear Information System (INIS)

    1992-01-01

    The German integrated association is a union of those electric power supply utilities in the Federal Republic of Germany which cooperate in the integrated operation of 220 kV and 380 kV. The German integrated association (DVG) was founded in 1948. Its main task is to create the technical, operational and legal conditions for the cooperation in the national and international integrated system. The inclusion of the new Federal States has been practiced for the first time with the 320 MW power station in Offleben. (DG) [de

  17. The German simulator center for the training of nuclear power plant operators

    International Nuclear Information System (INIS)

    Hoffmann, E.

    1996-01-01

    Simulator training for nuclear power plant operators in Germany is conducted in The Simulator Center in Essen. The companies operating The Center are KSG/GfS. KSG provides simulators, GfS performs the training. The German Simulator Center is equipped with five simulators in training, nine simulators are under construction and will be ready for training until the beginning of 1997. This institution serves 22 nuclear power plants units in Germany, Switzerland (NPP Goesgen-Daeniken) and the Netherlands (NPP Borssele) and trains 1,800 persons every year. As a common enterprise the company is owned by 12 utilities, which leads to the necessity to prepare common rules and guidelines for simulator specification, training of instructors, assessment of trainees, training material and preparation and methodical running of simulator courses

  18. German "Soft power" Policies in the Muslim World

    Directory of Open Access Journals (Sweden)

    Leili R. Rustamova

    2015-01-01

    Full Text Available In recent years, a number of foreign policy concepts declared the importance of using the instruments of "soft power" to promote the national interests of a country. Soft power is the ability through political values, culture and foreign policy to influence others by forming attractiveness [18]. Germany is generally recognized as the leader in the resources of "soft power." The article discusses what kind of resources are deployed by Germany to increase its "soft power" in the Muslim direction of foreign policy. The Muslim world has its own specifics, which complicate the use of instruments of "soft power." Countries with large Muslim population are difficult to influence, as they differ from Europe in the civilizational respect, have their own customs and traditions which they strictly follow because of the nature of Muslim religion. The author notes that in the Muslim direction of foreign policy the problem for Germany lies in the fact that the formation of its attractiveness resulted in a significant flow of immigration of Muslims in the country. A part of immigrant Muslims tries to live isolated from European society, professes radical currents ofIslam and participates in military conflicts abroad, participation in which in the role of active player is ruled out by Germany. Failure to integrate them into German society and the lack of progress in the formation of its positive image in the Muslim countries resulted, on the one hand, in the split of German society, on the other hand, in the threat of absorption by foreign civilization, as it is observed now in Germany the presence of "soft power" of Muslim countries, which use its former and current citizens to influence German political course. The article was written within the constructivist methodology, which consider the "soft power" as a way of construction of social reality with the use of tangible and intangible resources for the formation of an attractive image of Germany in world

  19. Expected returns from a tax on nuclear fuel elements in the context of longer service lives of German nuclear power plants

    International Nuclear Information System (INIS)

    Kondziella, Hendrik; Bruckner, Thomas

    2010-01-01

    To what extent will the fuel element tax introduced by the German government in combination with the longer service life of nuclear power stations reduce the profits of public utilities? A qualitative assessment suggests that the tax will not equal the full profits. Using an electricity market model, various scenarios can be calculated for an eight-year prolongation of the residual service life of existing nuclear power plants. (orig.)

  20. West German Jewry: Guilt, Power and Pluralism

    Directory of Open Access Journals (Sweden)

    Anthony d. Kauders

    2010-04-01

    Full Text Available The essay will address the history of West German Jewry using the concept of guilt as its guiding theme. Jews in West Germany had a bad conscience on account of living in the “land of the murderers.” This bad conscience not only distinguished them from other Jewish communities, it also explains much of what characterized West German Jewry from 1945 to 1989: its particular economic structure; its especially close ties to Israel; its preoccupation with democratization; its power arrangements; and its communal life. The essay will address these issues, and trace a development that led from a close-knit, ideologically homogeneous group to one that became ever more pluralistic in the 1970s and 1980s.

  1. Life extension for German nuclear power plants

    International Nuclear Information System (INIS)

    Heller, W.

    2005-01-01

    The Federation of German Industries (BDI) commissioned a study of the ''Economic Effects of Alternative Lifetimes of Nuclear Power Plants in Germany.'' The expert organizations invited as authors were the Power Economy Institute of the University of Cologne (EWI) and Energy Environment Forecast Analysis GmbH (EEFA), Berlin. The reasons for commissioning the Study include the changed framework conditions (deregulation, CO 2 emission certificate trading, worldwide competition for resources), which have altered the energy supply situation in Europe. The findings of the Study were presented to the public by the BDI on October 26, 2005. The study deals with two scenarios of extended lifetimes for German nuclear power plants of 40 and 60 years as against the existing regulations with plant lifetimes limited to approx. 32 years. The longer service lives of plants are reflected in reduced electricity generation costs and thus may have a positive influence on electricity prices. Moreover, there would be additional growth of production together with additional jobs, all of which would add up to nearly 42,000 persons for all sectors of the economy as compared to the basic scenario. Also, CO 2 emissions could be curbed by up to 50 million tons of carbon dioxide. The Study offers ample and valid reasons in favor of extending the lifetimes of nuclear power plants. In the interest of general welfare, politics would be well advised to relax the restrictions on plant life in the course of this legislative term. (orig.)

  2. Development of the on-site power supply in German nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Simon, M. [Gesellschaft fuer Reaktorsicherheit - GRS mbH, Schwertnergasse 1, D-5000 Koeln 1, Cologne (Germany)

    1986-02-15

    The design of the on-site power supply is different in German Nuclear Power Plants, depending on age and size of the plant. The cause for this is the evolution of the safety requirements. The general development of the design of safety Systems, which resulted in a strict separation of redundant trains is also reflected in the design of the emergency power system and even the complete on-site power supply System. This will be demonstrated by different examples. The advantages of this design with respect to the availability of on-site power will be explained and verified by means of operating experience. (author)

  3. Radiation exposure in German nuclear power plants

    International Nuclear Information System (INIS)

    Mueller, W.

    1981-01-01

    The individual and collective doses in German nuclear power stations have decreased remarkably since the beginning of the commercial nuclear power production. The paper discusses the influencing factors, that have caused this development and points out areas where improvements are possible in the future. Moreover the interaction between radiation protection practice and the relevant legal regulations is considered. Usually the recording of job related doses is regarded as the most direct access to possible improvements. Concluding, it is therefore demonstrated by some examples how the evaluation of such information has taken effect in practice. (orig.) [de

  4. Status of the technical project design phase of the German Waste Management Center

    International Nuclear Information System (INIS)

    Mischke, J.

    1978-01-01

    Under the waste management concept of the German Federal Government the utilities are to assume responsibility for waste management of the German nuclear power plants within the framework of the polluter pays principle, the ultimate storage of radioactive waste remaining a responsibility of the government. The duties of industry chiefly include planning, construction and operation of the facilities for fuel element storage, reprocessing and waste treatment and for processing the recovered nuclear fuel. The German utilities operating and planning nuclear power plants have set up the Deutsche Gesellschaft fuer Wiederaufarbeitung von Kernbrennstoffen mbH (DWK), which is to build the Waste Management Center and also works on the interim solutions planned for continuous waste management up to the completion of the planned Waste Management Center. For this purpose, DWK plans to construct temporary fuel storage facilities and has entered into agreements to secure reprocessing abroad of fuel elements from German nuclear power plants. In discharging its obligations DWK has acquired the extensive know-how available in the Federal Republic in the field of reprocessing spent fuel elements. (orig.) [de

  5. Competition effects of mergers: An event study of the German electricity market

    International Nuclear Information System (INIS)

    Keller, Andreas

    2010-01-01

    This paper investigates the competition effects of the entry of Vattenfall into the German electricity market. While the competition authorities supported the entry by approving Vattenfall's acquisition of three regional utilities, other market participants raised concerns over the emergence of an upcoming oligopoly in the German market for power generation. We contrast the efficiency hypothesis postulating pro-competitive effects of mergers with the market power hypothesis postulating anti-competitive effects. For the analysis of the two opposing hypotheses, we use an event study approach to the stock prices of Vattenfall's competitors in the German market. While we find no empirical evidence for increased market power in the German electricity market due to Vattenfall's mergers, there is some indication for efficiency increases. We therefore cannot oppose the view of the competition authorities predicting an overall positive effect for consumers as a result of Vattenfall's entry into the German electricity market.

  6. The German-German history of the nuclear power plant Greifswald. Nuclear power between east and west. 2. ed.; Die deutsch-deutsche Geschichte des Kernkraftwerkes Greifswald. Atomenergie zwischen Ost und West

    Energy Technology Data Exchange (ETDEWEB)

    Hoegselius, Per [Technische Hochschule Stockholm (Sweden). Bereich Gesellschaft, Wissenschaft und Technik

    2015-07-01

    The historical study covers the chapters The nuclear power plant Greifswald; Lubmin shortly before the ''Wende'' 1989; the German ''Wende''; from the last vote for the ''Volkskammer (parliament of the German Democratic Republic) to the German reunification; Lubmin in reunified Germany; conclusions and perspectives. In the attachment technical data about the reactors WWER-440/W-230 are summarized, including a list of WWERs in the former eastern bloc countries.

  7. The current situation of waste management at German nuclear power plants

    International Nuclear Information System (INIS)

    Hottenrott, G.; Mirschinka, V.

    2002-01-01

    An overview is given about the main points of the agreement between the four utility companies and the German government on June 11, 2001, concerning waste management and disposal. The current waste management situation is compared with the effects of the agreement on the future development of the German waste management concept. Major innovations are the discontinuation of reprocessing, the establishment of local intermediate storage facilities for fuel elements and the suspension of the exploration works conducted on the salt dome at Gorleben. (orig.)

  8. The electricity outlook in the former German Democrat Republic

    International Nuclear Information System (INIS)

    Ringeis, Wilhelm

    1991-01-01

    A reliable and low-price electricity supply is an essential part of the economic reconstruction now underway in the five new federal states (lander) of unified Germany, which were created from the former German Democratic Republic (GDR). Acting on the request of the last government of the GDR (which was freely elected), the West German utilities RWE Energie, PreussenElektra and Bayernwerk had already investigated suitable means to ensure the power supply of the five new states after unification. On 22 August 1990, after intensive negotiations with the government of the former GDR and the Treuhand privatisation agency, a set of agreements concerning the takeover and modernisation of the energy industry in eastern Germany was signed. The other German inter-connected utilities are also parties to the agreements. The essential task now for the West German utilities is to develop a reliable, low-priced, electricity supply capacity in the new federal states, which means taking long-term investment decisions. The extremely high environmental impact of the existing facilities must also be reduced considerably. (author)

  9. German risk study 'nuclear power plants, phase B'

    International Nuclear Information System (INIS)

    Heuser, F.W.

    1989-01-01

    The results of the German risk study 'Nuclear power plants, phase B' indicate that an accident in a nuclear power plant which cannot be managed by the safety systems according to design, is extremely improbable: Its probability is at about 3 to 100,000 per year and plant. Even if the safety systems fail, emergency measures can be effected in a nuclear power plant to prevent an accident. These in-plant emergency measures diminish the probability of a core meltdown to about 4 to 1,000,000 per year and plant. Hence, the accident risk is greatly reduced. The information given by the author are to smooth the emotional edge in the discussion about the safety of nuclear power plants. (orig.) [de

  10. Pressurized thermal shock analysis in German nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Fricke, Stefan; Braun, Michael [TUEV NORD Nuclear, Hannover (Germany)

    2015-03-15

    For more than 30 years TUeV NORD is a competent consultant in nuclear safety is-sues giving expert third party opinion to our clients. According to the German regulations the safety against brittle fracture has to be proved for the reactor pressure vessel (RPV) and with a new level of knowledge the proof has to be continuously updated with the development in international codes and standards like ASME, BS and RCC-M. The load of the RPV is a very complex transient pressure and temperature situation. Today these loading conditions can be modeled by thermal hydraulic calculations and new experimental results much more detailed than in the construction phase of German Nuclear Power Plants in the 1980s. Therefore, the proof against brittle fracture from the construction phase had to be updated for all German Nuclear Power Plants with the new findings of the loading conditions especially for a postulated small leakage in the main coolant line. The RPV consists of ferritic base material (about 250 mm) and austenitic cladding (about 6 mm) at the inner side. The base material and the cladding have different physical properties which have to be considered temperature dependently in the cal-culations. Radiation-embrittlement effects on the material are to be respected in the fracture mechanics assessment. The regions of the RPV of special interest are the core weld, the inlet and outlet nozzle region and the flange connecting weld zone. The fracture mechanics assessment is performed for normal and abnormal operating conditions and for accidents like LOCA (Loss of Coolant Accident). In this paper the German approach to fracture mechanics assessment to brittle fracture will be discussed from the point of view of a third party organization.

  11. The German DEMO working group. Perspectives of a fusion power plant

    International Nuclear Information System (INIS)

    Hesch, Klaus

    2013-01-01

    Fusion development has many different challenges in the areas of plasma physics, fusion technologies, materials development and plasma wall interaction. For making fusion power a reality, a coherent approach is necessary, interlinking the different areas of work. To this end, the German fusion program started in 2010 the German DEMO Working Group, bringing together high-level experts from all the different fields, from the 3 German fusion centers Max-Planck-Institut fuer Plasmaphysik (IPP), Karlsruher Institut fuer Technologie (KIT) and Forschungszentrum Juelich (FZJ). An encompassing view of what will be needed with high priority, in plasma physics, in fusion technology and in the interrelation of the fields, to make fusion energy real, has been elaborated, and is presented here in a condensed way. On this basis, the 3 German fusion centers now are composing their work program, towards a fusion demonstration reactor DEMO. (orig.)

  12. The German R&D Program for CO2 Utilization-Innovations for a Green Economy.

    Science.gov (United States)

    Mennicken, Lothar; Janz, Alexander; Roth, Stefanie

    2016-06-01

    Carbon capture and utilization (CCU) is a field of key emerging technologies. CCU can support the economy to decrease the dependency on fossil carbon raw materials, to stabilize electricity grids and markets with respect to a growing share of fluctuating renewable energy. Furthermore, it can contribute to mitigate anthropogenic CO2 emissions. The German Federal Ministry of Education and Research has provided substantial financial support for research and development projects, stimulating research, development, and innovations in the field of CO2 utilization. This review provides an overview over the most relevant funding measures in this field. Examples of successful projects demonstrate that CCU technologies are already economically viable or technologically ready for industrial application. CCU technologies as elements of a future "green economy" can contribute to reach the ambitious German sustainability targets with regard to climate protection as well as raw material productivity.

  13. The German energy industry in the 21. century dawn of a new era?

    International Nuclear Information System (INIS)

    Kasper, K.J.

    2000-01-01

    Having crossed the threshold into the new millennium the power utilities business finds itself confronted by new challenges. In worldwide terms the uppermost objective is, while taking due account of climatic factors and of the obligations resulting from the various World Climate Conferences held so far, to ensure a sufficient and reliable supply of energy for the world's growing population. The gap between the supply of energy and the demand for energy must be closed. In European terms the situation looks a little different. The supply structure is excellent - characterized more by over-capacity than energy shortage. As a result of the liberalization process that has started, the European power utilities have undergone vital changes. Market influences on the power utilities corporations are massive. Fusions and takeovers are the order of the day. The German power business, like others in Europe, is feeling the effects of these two aspects. Also, at national level in Germany, there is the attempt to reach a new energy consensus. An agreement was reached on the 14. of June 2000 between the German federal government and the power utilities. This laid down regulations on the future operation of German nuclear power plants and the disposal of spent fuel elements - to apply up until the government's planned withdrawal from nuclear power. However, the politicians have yet to answer the question of how, in the long term, a sensibly balanced German energy mix might look. There is not as yet - nor in the foreseeable future is there likely to be - an energy consensus in Germany supported by all social and political groups. The respective approaches and ideas differ too widely. The failure, in the so-called 'Energy dialog 2000', of political parties, environmental organizations, and representatives from industry to achieve any results that might point the way forward and tell us where we are heading shows this all too clearly. (author)

  14. Breeders: operational experience with fast power reactors in five states - more intensive German-French breeder cooperation

    International Nuclear Information System (INIS)

    Hueper, R.

    1978-01-01

    In the past year contracts have been signed and implemented for German-French cooperation in LMFBR development and commercialization. - The first German nuclear power station with a sodium cooled fast reactor, KNK II in Karlsruhe, is going into operation. - Construction of the prototype SNR 300 at Kalkar (Lower Rhine) is slowing down awaiting a decision of the German Federal Constitutional Court. - On the international level, remarkable experience in the operation of fast power reactors has accumulated. - Possible fuel cycle alternatives are being evaluated by an international committee. (orig.) [de

  15. Utilization of a full-scope simulation for training the operating personel of nuclear power plants

    International Nuclear Information System (INIS)

    Mathias, S.G.

    1987-01-01

    A full-scope simulator of the Angra-2 Nuclear Power Plant has been installed at the NUCLEBRAS Training Center in Mambucaba - close to the site where that Plant is being built -, the goal of providing training for the operating personnel of the KWU-design nuclear power plants to be installed in Brazil. Due to the delays which occurred in the construction of Angra-2, NUCLEBRAS has established an extensive program for the utilization of the simulator for the training of operators for German nuclear power plants and for Spain's Trillo Plant. Besides yielding profits to NUCLEBRAS, that program is resulting in considerable experience in the area of nuclear power plant operators' training generating international recognition to the NUCLEBRAS Training Center. (Author) [pt

  16. German energy policy in deregulated Europe

    International Nuclear Information System (INIS)

    Kuhnt, D.

    2000-01-01

    The author argues in favor of a more fact-oriented German energy policy: Firstly, German energy policy must accept the new European framework of a market economy. This means that German utilities must no longer be burdened with the implementation of political objectives. The German power industry needs a level playing field for competition on a European scale. Consequently, also the European partner countries should not limit themselves to the minimum conditions of the Single Market Directive in opening their markets. Secondly, German energy policy must develop new forms of cooperation with the power industry so as to maintain domestic employment and the addition of value despite considerably stronger competitive pressure. Also the conflicting targets of sustainability, continuity of supply, and economic viability must not only be discussed, but must be turned into productive approaches. Thirdly, this means that there must be no inadmissible solution in matters nuclear. If the German power industry is to remain strong, in the interest of domestic jobs and opportunities for the future, it must not lose any more domestic market share to other European companies. Fourthly, we need a new energy policy which takes cognizance of the results of market development in a more rational, less emotional way. In this respect, it should be limited henceforth to supporting renewable energies and technologies so as to enhance energy efficiency in line with market requirements. Fifthly, German energy policy must not commit the mistake of enforcing deregulation and, at the same time, exempting large segments of the market from competition. Thus, the planned expansion of renewable energies, and the increase in cogeneration to more than thirty percent of the German electricty generation, by way of quotas and revenues for electricity from these sources fed into the public grid, are incompatible with competition in Europe. The electricity tax within the framework of the eco tax, the

  17. Ageing management in German nuclear power plants

    International Nuclear Information System (INIS)

    Becker, D.E.; Reiner, M.

    1998-01-01

    In Germany, the term 'ageing management' comprises several aspects. A demand for a special ageing monitoring programme is not explicitly contained in the regulations. However, from the Atomic Energy Act and its regulations results the operator's obligation to perform extensive measures to maintain the quality of the plant and the operating personnel working in the plant. From this point of view, comprehensive ageing management in German nuclear power plants has taken place right from the start under the generic term of quality assurance. (author)

  18. Cost reduction potentials in the German market for balancing power

    International Nuclear Information System (INIS)

    Flinkerbusch, Kai; Heuterkes, Michael

    2010-01-01

    This article examines potential cost reductions in the market for balancing power by pooling all four German control areas. In a united control area both the procurement and the production of balancing power may be more efficient than in four separated control areas. Our data contain bids on energy procurement as well as balancing power flows in the period from December 2007 to November 2008. A reference scenario simulates the market results for secondary and tertiary balancing power. Subsequently, we simulate a united control area. We show that in the period under review the total costs of balancing power are reduced by 17%. (author)

  19. CO2 burden and climatic risk. Strategies of action of the German electricity supply companies. 2. rev. ed.

    International Nuclear Information System (INIS)

    1992-01-01

    According to indications of the working group for questions on the climate of the association of German electric utilities (VDEW), energy application of power generation contributes to the German CO 2 -emission with about 30%. A reduction of CO 2 -emissions in electro-economics can be achieved especially with a decrease of the application of fossil energy sources parallel to a better energy utilization (increase of the efficiency, enlargement of cogeneration) and through the expansion of power generation free from CO 2 (nuclear energy, renewable energy sources). (orig.) [de

  20. Custom power - the utility solution to distribution power quality

    Energy Technology Data Exchange (ETDEWEB)

    Woodley, N H [Westinghouse Electric Corp., Pittsburgh, PA (United States)

    1997-04-01

    The design of custom power products for electric power distribution system was discussed. Problems with power quality that result in loss of production to critical processes are costly and create a problem for the customer as well as the electric utility. Westinghouse has developed power quality improvement equipment for customers and utilities, using new technologies based on power electronics concepts. The Distribution Static Compensator (DSTATCOM) is a fast response, solid-state power controller that provides flexible voltage control for improving power quality at the point of connection to the utility`s 4.16 to 69 kV distribution feeder. STATCOM is a larger version of the DSTATCOM that can be used to solve voltage flicker problems caused by electric arc furnaces. Westinghouse has also developed a Dynamic Voltage Restorer (DVR) which protects a critical customer plant load from power system voltage disturbances. Solid-State Breakers (SSB) have also been developed which offer a solution to many of the distribution system problems that result in voltage sags, swells, and power outages. 6 refs., 8 figs.

  1. Availability Improvement of German Nuclear Power Plants

    International Nuclear Information System (INIS)

    Wilhelm, Oliver

    2008-01-01

    High availability is important for the safety and economical performance of Nuclear Power Plants (NPP). The strategy for availability improvement in a typical German PWR shall be discussed here. Key parameters for strategy development are plant design, availability of safety systems, component reliability, preventive maintenance and outage organization. Plant design, availability of safety systems and component reliability are to a greater extent given parameters that can hardly be influenced after the construction of the plant. But they set the frame for maintenance and outage organisation which have shown to have a large influence on the availability of the plant. (author)

  2. Lessons from American-German nuclear power plant construction. Quality, safety and costs of an attempt to integrate American and German nuclear power plant technology

    International Nuclear Information System (INIS)

    Buchwald, K.

    1979-05-01

    The 1300 MW nuclear power plant at Muelheim-Kaerlich has been under construction since the beginning of 1975. It is being equipped with a pressurised water reactor which has been adapted to the German client's requirements and German licensing practice, based on a license held by Babcock and Wilcox USA (B and W). The problems which have arisen in making this adaptation are the result of different requirements in the USA and the Federal Republic of Germany which make it very difficult to integrate the two technologies. Full integration will almost certainly be impossible, but integration to the widest possible extent is important because it might mean both greater safety and reduced costs. In this article it is intended to show where the problems of integration lie and how they might perhaps be overcome. (author)

  3. The Strategic Challenge of Capacity for German Decommissioning

    International Nuclear Information System (INIS)

    Thomauske, Bruno; Moloney, Barry; Charlier, Frank

    2016-01-01

    Full text of publication follows: Experience of decommissioning across the world has allowed the nuclear industry to develop and enhance most of the technologies required for safe and efficient dismantling of Nuclear Power Plants (NPPs). One strategic challenge confronting the industry now is how to scale up implementation to address the burgeoning demand for dismantling of full size NPPs during the period 2016-2040. The German decommissioning programme will provide early evidence of whether the European industry can rise to this strategic challenge. It is widely reported in the media that German utilities will spend some Euro 30-40 Bn decommissioning NPPs during the next 25 years. In total, 22 NPPs will progress through the typical three stage programme encompassing post operations, dismantling and site clearance, with a peak occurring in the 2020's. Politically, immediate dismantling is strongly preferred as the strategy for the NPPs, so there will be a surge in decommissioning expenditure starting as soon as 2017. A critical issue is whether the German nuclear industry has sufficient capacity to deliver the programme, and where utilities may seek participation by other European companies. Innovation may be required, perhaps at a non-technical level. The circumstances of the German market require a thorough understanding. While the market is apparently open and receptive to international participation, three factors make it hard for foreign companies to penetrate. The political and regulatory environment is tough and for many foreign companies difficult to understand quickly. Utilities are mostly pursuing self-perform decommissioning strategies to preserve employment for their skilled workforce, limiting scope for some contractors. Finally, an innovative and highly experienced German nuclear industry can present formidable competition. Yet, this industry does not possess all the capacity needed for the utilities' programmes. Risks for new entrants can

  4. Five years of partnership programme between German and East European nuclear power plant operators

    International Nuclear Information System (INIS)

    Kraemer, P.

    1995-01-01

    In a jointly adopted communique in August 1992 the regulations governing the partnerships were laid down. The following principles are given priority: bilateral exchange of operating experience on the basis of equal partnership; the knowledge gained from the exchange of experience is used to improve the operation and safety of the respective partner plant; the partnership programme is free from commercial interests and does not include transfer of funds. Since the establishment of the first partnership relations (Biblis) with an east european nuclear power plant (Balakowo) late in April 1990, a total of 126 reciprocal visits was paid, 82 of which to German nuclear power plants. The balance of the efforts made by German nuclear power plant operators to integrate east european nuclear plant operators can be considered positive. (orig./HP) [de

  5. Using management of aging in German nuclear power plants - aspects of KTA 1403 pertaining to residual power operation, post-shutdown operation and residual operation

    International Nuclear Information System (INIS)

    Barreiro, Pablo; Bever, Thomas; Brast, Gerhard; Elsche, Bjoern; Reese, Sven H.; Grossmann, Patrick; Widera, Martin; Huettner, Frank; Linnemann, Thomas; Smit, Swen-Olaf; Zander, Ralf-Michael

    2013-01-01

    Management of aging in nuclear power plants originated in the United States of America and became a topic of debate in Germany from the late 1990s onward. On the basis of the existing plant-specific measures practiced comprehensively, KTA 1403, ''Management of Aging in Nuclear Power Plants'', was drafted and finalized in 2010. This publication first presents the context of AM with regard to German nuclear power plants, including references to national and international historical developments. Against this backdrop, the difference between management of aging and lifetime management is discussed next. This is followed by a description of the status of the AM process in nuclear power plants currently in operation, especially organizational plant-specific implementation. As a consequence of the decision by the German federal government to discontinue the peaceful use of nuclear power in Germany and the associated 13th amendment to the Atomic Energy Act of July 31, 2011, a considerable part of the German nuclear power plant park already lost its right of power operation. In this situation, aspects of AM are discussed for plants in the no-power, post-operation and residual operation phases. Finally, experience accumulated in plant-specific execution of the AM process on the basis of KTA 1403 is considered and summarized.

  6. Radioactive waste management policy and its implementation in the German Democratic Republic

    International Nuclear Information System (INIS)

    Sitzlack, G.

    1988-01-01

    Waste management is considered an integral part of measures for the safe utilization of nuclear energy. In the German Democratic Republic, back in 1962 the government established the National Board for Nuclear Safety and Radiation Protection as a special body whose regulatory responsibilities include the setting up of an appropriate waste management policy for the country's nuclear power programme. After studies started in the 1960s a central system for the collection and disposal of low- and intermediate-level radioactive wastes from nuclear power plants and other sources throughout the country was established, this started operation a few years ago. The waste repository is a reconstructed salt mine which is operated by the main waste producer - the nuclear power plant utility. There are no current issues with high-level waste, as the spent fuels are stored for many years and then returned to the supplier country, the Soviet Union. The paper describes the relevant regulatory framework in the German Democratic Republic. The solution established here takes future nuclear power uses into account. (author)

  7. Analytic advanced development in the German Risk Study on Nuclear Power Plants

    International Nuclear Information System (INIS)

    1984-01-01

    The study carried out by the Ecological Institute (Oeko-Institut) deals with the difficulties encountered with the decision-making models and statistical models and methods of the German Risk Study on Nuclear Power Plants for the determination of care meltdown frequency and for the estimation of the behaviour of components in the event of a failure. Related deficiencies of the German Risk Study and the absence of completeness and lading representiveness of the course and causes of incidents considered are pointed out. The accident consequences model and the climatological-meteorological data base are considered non-representative. (RF) [de

  8. Blown by the wind. Replacing nuclear power in German electricity generation

    International Nuclear Information System (INIS)

    Lechtenböhmer, Stefan; Samadi, Sascha

    2013-01-01

    Only three days after the beginning of the nuclear catastrophe in Fukushima, Japan, on 11 March 2011, the German government ordered 8 of the country's 17 existing nuclear power plants (NPPs) to stop operating within a few days. In summer 2011 the government put forward a law – passed in parliament by a large majority – that calls for a complete nuclear phase-out by the end of 2022. These government actions were in contrast to its initial plans, laid out in fall 2010, to expand the lifetimes of the country's NPPs. The immediate closure of 8 NPPs and the plans for a complete nuclear phase-out within little more than a decade, raised concerns about Germany's ability to secure a stable supply of electricity. Some observers feared power supply shortages, increasing CO 2 -emissions and a need for Germany to become a net importer of electricity. Now – a little more than a year after the phase-out law entered into force – this paper examines these concerns using (a) recent statistical data on electricity production and demand in the first 15 months after the German government's immediate reaction to the Fukushima accident and (b) reviews the most recent projections and scenarios by different stakeholders on how the German electricity system may develop until 2025, when NPPs will no longer be in operation. The paper finds that Germany has a realistic chance of fully replacing nuclear power with additional renewable electricity generation on an annual basis by 2025 or earlier, provided that several related challenges, e.g. expansion of the grids and provision of balancing power, can be solved successfully. Already in 2012 additional electricity generation from renewable energy sources in combination with a reduced domestic demand for electricity will likely fully compensate for the reduced power generation from the NPPs shut down in March 2011. If current political targets will be realised, Germany neither has to become a net electricity importer, nor will be unable

  9. The power supply in the new German Laender (formerly East Germany). Die Stromversorgung in den neuen Bundeslaendern

    Energy Technology Data Exchange (ETDEWEB)

    Lindwedel, E [Preussische Elektrizitaets-AG (Preussenelektra), Hannover (Germany, F.R.); Radtke, H [Verbundnetz Elektroenergie AG, Berlin (Germany, F.R.)

    1991-02-01

    Due to the division lasting over 40 years between the two German States, there was not only a political but also an electrical border. The 380 kV line from Helmstedt to Berlin planned in 1988 and the tee-off into what was then East Germany, made it possible, after completion of the section from Helmstedt to Wolmirstedt in 1989, to operate power station control; but the political and economic changes on re-unification opened up the possibility of a rapid joint German combined operation in the context of the UCPTE. However, for the electrical connection of the eastern supply areas, a knowledge of the structure of the electrical power supply in the new German Laender is important. (orig.).

  10. Technical dictionary power plant engineering. Vol. 1. German - English. - Pt. 1: Dictionary. Pt. 2: Abbreviations. 4. rev. and enlarged ed. Technisches Woerterbuch Kraftwerkstechnik. Bd. 1. Deutsch - Englisch. - T. 1: Woerterbuch. T. 2: Abkuerzungen

    Energy Technology Data Exchange (ETDEWEB)

    1987-01-01

    This dictionary is a compilation of German and English technical terms of power plant engineering as far as power plants, turbine-generators and assembly engineering are concerned. It is the result of a joint effort by the Kraftwerk Union AG (KWU) and Utility Power Corp. (UPC). The entire content has been revised and approx. 6000 new terms have been added. The dictionary is meant to form a basis for uniform terminology on technical documents as well as correspondence between KWU, UPC and licensees. This computer aided dictionary is printed in capital/low case letters. Only nouns, terms with an article and proper names are capitalized in German. Some terms are written differently in American and British English and are marked with (US) or (GB).

  11. Reliability data of fire protection equipment and features in German nuclear power plants

    International Nuclear Information System (INIS)

    Roewekamp, M.; Riekert, T.; Sehrbrock, W.

    1997-01-01

    In order to perform probabilistic fire safety analyses, a comprehensive data base is needed including physical characteristics of fire compartments and their inventory, fire occurrence frequencies, technical reliability data for all fire-related equipment, human actions and human error probabilities, etc. In order to provide updated and realistic reliability data, the operational behaviour of different fire protection features in two German nuclear power plants was analysed in the framework of the study presented here. The analyses are based on the examination of reported results of the regular inspection and maintenance programs for nuclear power plants. Besides a plant specific assessment of the reliability data a generic assessment for an application as input data for fault tree analyses in the framework of probabilistic risk studies for other German plants was carried out. The analyses of failures and unavailabilities gave the impression that most of them are single failures without relevance for the plant safety. The data gained from NPPs were compared to reliability data of the German insurance companies for the same protection features installed in non-nuclear installations and to older nuclear specific reliability data. This comparison showed up a higher reliability. (orig.) [de

  12. The 2002 amendment to the German atomic energy act concerning the phase-out of nuclear power

    International Nuclear Information System (INIS)

    Vorwerk, A.

    2002-01-01

    The phase-out of the use of nuclear power for electricity production has now been legally regulated by the 2002 Atomic Energy Act, based on the Agreement between the German Government and the energy utilities. The provisions of this Act comply with constitutional and European law, and take account of Germany's international commitments. The new 2002 Atomic Energy Act is supplemented by additional steps towards the phase-out, in particular in the area of nuclear disposal. These steps are being taken primarily within the framework of a planned national disposal plan and a procedure to be enveloped for the selection of a location for a final disposal site for radioactive wastes. The key task for the Laender authorities and the Federal Ministry for the Environment, Nature Conservation and Nuclear Safety continues to be to ensure that operators of nuclear power plants comply with a high standard of safety during the residual operating periods of their plants. (author)

  13. Plant specific safety inspection of German nuclear power plants taking into account the Fukushima-I (Japan) events

    International Nuclear Information System (INIS)

    2011-01-01

    The German Parliament requested (17 March 2011) a comprehensive inspection of German nuclear power plants. For this purpose independent expert commissions should perform a new risk analysis of all German NPPS and nuclear installations with respect to the lessons learned from the Fukushima (Japan) events and other extraordinary damage scenarios. The Reactor safety commission (RSK) was assigned by the German Bundesamt fuer Strahlenschutz to develop a catalogue of requirements for this safety inspection. The contribution summarizes the required inspection volume (status 30.03.2011) including the following events: natural events like earth quakes, floods, weather-based consequences and possible superposition. Additionally the following assumptions have to be considered: event independent postulated common failures or systematic faults, station blackout larger than 2 hours, long-term failure of the auxiliary cooling water supply; aggravating boundary conditions for the performance of emergency measures (non-availability of power supply), hydrogen generation and detonation hazard, restricted personnel availability, non-accessibility due to high radiation levels, impeded technical support from outside. (orig.)

  14. 2008 annual nuclear technology conference: opting out of the use of nuclear power. German special approach leads into a dead end of energy policy. Conference report

    International Nuclear Information System (INIS)

    Anon.

    2008-01-01

    The President of the Deutsches Atomforum, Dr. Walter Hohlefelder, emphasized in his opening address at the 2008 Annual Nuclear Technology Conference in Hamburg that the German special approach to nuclear power utilization led straight into a dead end of energy policy. ''The outcome is foreseeable: The ambitious German goals of carbon dioxide reduction are missed, the competitiveness of the country is jeopardized, dependency on foreign energy imports rises,'' Dr. Hohlefelder stated. In view of the growing challenges in energy policy Germany had no alternative but to reassess nuclear power. The only outcome of this reappraisal could be extension of the life of nuclear power plants currently in operation. This was necessary also in order to avoid an impending gap in German electricity supply, Dr. Hohlefelder added. He invited all stakeholders to join in an open, unbiased dialog. Dr. Hohlefelder openly criticized the continued ban on research into the development of new reactors. ''A policy of this kind, a policy which bans thinking, is unacceptable in a technology-oriented, industrialized nation such as Germany.'' Nuclear power technology as a high-tech area was a unique achievement which had contributed to the prosperity of the country. The Annual Nuclear Technology Conference, which was held for the 39th time this year, is one of the biggest specialized conferences in the nuclear field with an attendance, this year, of approximately 1300 participants from more than twenty nations. (orig.)

  15. Power from biomass: the power utility perspective

    International Nuclear Information System (INIS)

    Serafimova, K.; Angele, H.-C.

    2008-01-01

    This article takes a look at possible strategies that electricity utilities in Switzerland could follow in order to be able to make use of biomass as a source of energy. Increasing interest in damp biomass as a relatively cheap, renewable and climate-friendly source of energy is commented on. Strategic choices that energy utilities have to make when they decide to enter into the biomass market are examined. The potentials involved are examined, including biogenic materials from domestic wastes and from agriculture. Figures on potential waste tonnage are quoted. Questions on subsidies and the free market are examined. The setting up of 'virtual power stations' - networks of installations using photovoltaic, wind and biomass - is discussed, as are various strategies that utilities can follow in this area. Examples of such 'virtual power stations' are listed.

  16. Utilities objectives

    International Nuclear Information System (INIS)

    Cousin, Y.; Fabian, H.U.

    1996-01-01

    The policy of French and german utilities is to make use of nuclear energy as a long term, competitive and environmentally friendly power supply. The world electricity generation is due to double within the next 30 years. In the next 20 to 30 years the necessity of nuclear energy will be broadly recognized. More than for most industries, to deal properly with nuclear energy requires the combination of a consistent political will, of a proper institutional framework, of strong and legitimate control authorities, of a sophisticated industry and of operators with skilled management and human resources. One of the major risk facing nuclear energy is the loss of competitiveness. This can be achieved only through the combination of an optimized design, a consistent standardization, a proper industrial partnership and a stable long term strategy. Although the existing plants in Western Europe are already very safe, the policy is clearly to enhance the safety of the next generation of nuclear plants which are designing today. The French and German utilities have chosen an evolutionary approach based on experience and proven technologies, with an enhanced defense in depth and an objective of easier operation and maintenance. The cost objective is to maintain and improve what has been achieved in the best existing power plants in both countries. This calls for rational choices and optimized design to meet the safety objectives, a strong standardization policy, short construction times, high availability and enough flexibility to enable optimization of the fuel cycle throughout the lifetime of the plants. The conceptual design phase has proven that the French and German teams from industry and from the utilities are able to pursue both the safety and the cost objectives, basing their decision on a rational approach which could be accepted by the safety authorities. (J.S.)

  17. Purchasing non-utility power

    International Nuclear Information System (INIS)

    Brackeen, L.G.

    1990-01-01

    The author discusses Houston Lighting and Power Company's procedure for purchasing power from cogenerators. By way of introduction, HL and P is the eighth largest electric utility in the United States in terms of kilowatt-hour sales and the second largest purchaser of natural gas in the nation. HL and P is also the principal utility providing electric service to the massive petrochemical industry in Southeast Texas. Of the 4,800 MW of cogeneration available, HL and P buys 945 MW under firm contracts, wheel 1,600 MW to other utilities, buy 400 MW under non-firm contracts and the balance is self-generation used to displace power which would otherwise be purchased from HL and P. With all this cogeneration capacity available, the problem until recently has been managing the surplus. HL and P now is finding itself in the unaccustomed position of needing to buy additional power or build plants to meet the modest growth it forecasts for Houston. The need for additional capacity coincides with the expiration of cogeneration contracts in 1993 and 1994. To meet this capacity need, they are determined to avoid buying cogeneration at a very high price and on delivery terms which do not reflect realistic benefits to their electric customers. The paper gives information on the background on PUC regulations and legislation, then briefly reviews the procedure for purchase of cogenerated power in Texas

  18. Present status and perspectives of Co-combustion in German power plants

    Energy Technology Data Exchange (ETDEWEB)

    Richers, U.; Seifert, H. [Forschungszentrum Karlsruhe GmbH Technik und Umwelt (Germany). Inst. fuer Technische Chemie]|[Forschungszentrum Karlsruhe GmbH Technik und Umwelt (Germany). Programm Nachhaltigkeit, Energie- und Umwelttechnik; Scheurer, W.; Hein, K.R.G. [Stuttgart Univ. (Germany). Inst. fuer Verfahrenstechnik und Dampfkesselwesen

    2002-05-01

    Various approaches to the future waste management policy in Germany are currently under discussion. One problem arising in this connection is the suitability of existing furnaces for the co-combustion of waste. The use of sewage treatment sludge in power plants is already being practiced on a technical scale. Co-combustion in power plants is of interest also because of the CO{sub 2} problem, as renewable resources can also be used for this purpose. This article documents the technical status of co-combustion in Germany and the available quantities of selected supplementary fuels. Moreover, experience accumulated in German coal fired power plants in using supplementary fuels is compiled. Future possibilities are assessed. (orig.) [German] Fuer die zukuenftige Ausrichtung der Abfallentsorgung gibt es verschiedene Moeglichkeiten, die in der Bundesrepublik Deutschland diskutiert werden. Eine Fragestellung in diesem Zusammenhang ist die Eignung bestehender Feuerungsanlagen fuer die Mitverbrennung von Abfallstoffen. Der Einsatz von Klaerschlamm in Kraftwerken wird bereits grosstechnisch praktiziert. Die Mitverbrennung in Kraftwerken ist zusaetzlich aufgrund der CO{sub 2}-Problematik von Interesse, denn nachwachsende Rohstoffe eignen sich ebenfalls zur Mitverbrennung. In dieser Arbeit werden der technische Stand der Mitverbrennung in der Bundesrepublik Deutschland und die dort zur Verfuegung stehenden Mengen ausgewaehlter Zusatzbrennstoffe dokumentiert. Ausserdem werden die Erfahrungen aus deutschen Kraftwerken beim Einsatz von Zusatzbrennstoffen zusammengestellt. Die zukuenftigen Moeglichkeiten werden abgeschaetzt. (orig.)

  19. Decommissioning of nuclear power plants

    International Nuclear Information System (INIS)

    Vollradt, J.

    1977-01-01

    A survey of the main questions of decommissioning of nuclear power plants will be given in the sight of German utilities (VDEW-Working group 'Stillegung'). The main topics are: 1) Definitions of decommissioning, entombment, removal and combinations of such alternatives; 2) Radioactive inventory (build up and decay); 3) Experience up to now; 4) Possibilities to dismantle are given by possibility to repair nuclear power plants; 5) Estimated costs, waste, occupational radiation dose; 6) German concept of decommissioning. (orig./HK) [de

  20. The impact of carbon capture and storage on a decarbonized German power market

    International Nuclear Information System (INIS)

    Spiecker, S.; Eickholt, V.; Weber, C.

    2014-01-01

    The European energy policy is substantially driven by the target to reduce the CO 2 -emissions significantly and to mitigate climate change. Nevertheless European power generation is still widely based on fossil fuels. The carbon capture and storage technology (CCS) could be part of an approach to achieve ambitious CO 2 reduction targets without large scale transformations of the existing energy system. In this context the paper investigates on how far the CCS-technology could play a role in the European and most notably in the German electricity generation sector. To account for all the interdependencies with the European neighboring countries, the embedding of the German electricity system is modeled using a stochastic European electricity market model (E2M2s). After modeling the European side constraints, the German electricity system is considered in detail with the stochastic German Electricity market model (GEM2s). The focus is thereby on the location of CCS plant sites, the structure of the CO 2 -pipeline network and the regional distribution of storage sites. Results for three different European energy market scenarios are presented up to the year 2050. Additionally, the use of CCS with use of onshore and offshore sites is investigated. - Highlights: • We present a model framework for the evaluation of carbon capture and storage (CCS). • Different scenarios to analyze regional differences within Germany. • Interdependencies between CO 2 bound and demand are the main influencing factors. • A comprehensive investment in CCS power plants is not likely in the next decades. • Storage sites are no restricting factor but public acceptance is a crucial point

  1. Power Sales to Electric Utilities

    Energy Technology Data Exchange (ETDEWEB)

    None

    1989-02-01

    The Public Utilities Regulatory Policies Act (PURPA) of 1979 requires that electrical utilities interconnect with qualifying facilities and purchase electricity at a rate based upon their full avoided costs (i.e., costs of providing both capacity and energy). Qualifying facilities (QF) include solar or geothermal electric units, hydropower, municipal solid waste or biomass-fired power plants, and cogeneration projects that satisfy maximum size, fuel use, ownership, location, and/or efficiency criteria. In Washington State, neither standard power purchase prices based upon a proxy ''avoided plant'', standard contracts, or a standard offer process have been used. Instead, a variety of power purchase contracts have been negotiated by developers of qualifying facilities with investor-owned utilities, public utility districts, and municipally-owned and operated utilities. With a hydro-based system, benefits associated with resource acquisition are determined in large part by how compatible the resource is with a utility's existing generation mix. Power purchase rates are negotiated and vary according to firm energy production, guarantees, ability to schedule maintenance or downtime, rights of refusal, power plant purchase options, project start date and length of contract; front-loading or levelization provisions; and the ability of the project to provide ''demonstrated'' capacity. Legislation was also enacted which allows PURPA to work effectively. Initial laws established ownership rights and provided irrigation districts, PUDs, and municipalities with expanded enabling powers. Financial processes were streamlined and, in some cases, simplified. Finally, laws were passed which are designed to ensure that development proceeds in an environmentally acceptable manner. In retrospect, PURPA has worked well within Washington. In the state of Washington, 20 small-scale hydroelectric projects with a combined generating capacity of

  2. Ownership unbundling in the electric power industry. Reconcilability with German constitutional law and with EU law relating to German vertically integrated utilities; Ownership unbundling in der Energiewirtschaft. Vereinbarkeit einer eigentumsrechtlichen Entflechtung in der Energiewirtschaft mit den Grundrechten des Grundgesetzes und des Gemeinschaftsrechts deutscher vertikal integrierter Energieversorgungsunternehmen

    Energy Technology Data Exchange (ETDEWEB)

    Wachovius, Martin

    2008-07-01

    The publication investigates legal problems relating to ownership unbundling of vertically integrated utilities according to new EU law, especially the draft directive of the EU Commission of 19 September 2007. After a definition of the term and its historical development, the problem of law giving competence of the EU is discussed. Another issue is the problem if a new structure of European and German energy law is compatible with the basic laws defined in EU law and German constitutional law, namely with the principle of guarantee of ownership, professional freedom, and general freedom of action.

  3. Utilization of nuclear energy for generating electric power in the FRG, with special regard to LWR-type reactors

    International Nuclear Information System (INIS)

    Vollradt, J.

    1977-01-01

    Comments on interdependencies in energy industry and energy generation as seen by energy supply utilities, stating that the generation of electric power in Germany can only be based on coal and nuclear energy in the long run, are followed by the most important, fundamental, nuclear-physical, technological and in part political interdependencies prevailing in the starting situation of 1955/58 when the construction of nuclear power plant reactors began. Then the development ranging to the 28000 MW nuclear power output to be expected in 1985 is outlined, totalling in 115000 MW electric power in the FRG. Finally, using the respectively latest order, the technical set up of each of the reactor types with 1300 MWe unit power offered by German manufacturers are described: BBC/BBR PWR-type reactor Neupotz, KWU-PWR-type reactor Hamm and KWU PWR-type reactor double unit B+C Gundremmingen. (orig.) [de

  4. Financing the electric power utilities, especially the nuclear power in Japan

    International Nuclear Information System (INIS)

    Tajima, T.

    1975-04-01

    Electric power demands in Japan have shown a remarkable growth at an annual rate of 12% since 1965. Nine electric power companies have invested large amounts of money so far, amounting to over 1 trillion yen every year since 1972. A survey of the electric power supply system and an estimation of the electric power demands in 1980 and in 1985 are given. It is expected that the main portion of electric power in the future will gradually be generated by nuclear plants. Financial features of the electrical power utilities, the credit risk of the electric power utilities, and the raising of funds by electric power utilities are discussed. It is concluded that it will be necessary (1) to expand the capital market, (2) to enable the electric power companies to issue a sufficient amount of bonds, (3) to make the Government financing institutions, such as the Japan Development Bank, provide the electric power companies with larger funds on a long-term and low-interest rate basis, and (4) even to take such drastic steps as subsidizing interest on private loans to the electric power companies. (B.P.)

  5. Nuclear power in the energy economics of the German Democratic Republic

    International Nuclear Information System (INIS)

    Hildebrand, H.J.

    1977-01-01

    The present structure of the energy economy in the German Democratic Republic (East Germany) is described and the need of nuclear power stations for the future supply of energy is demonstrated. The selection of the type of nuclear reactor, the existing operating experience with nuclear equipment and the collaboration in this field with the U.S.S.R. is described. The training of personnel in nuclear techniques is noted. (H.E.G.)

  6. Regional power supply in 1998-1999. Progress report of the association of regional utilities - Arbeitsgemeinschaft regionaler Energieversorgungs-Unternehmen - ARE e.V.; Regionale Energieversorgung 1998-1999. Taetigkeitsbericht der Arbeitsgemeinschaft regionaler Energieversorgungs-Unternehmen - ARE - e.V.

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-04-01

    The ARE progress report discusses the following issues: Economic development and its effects on power supply; Deregulation of the electricity and gas market; Competition between regional utilities; Energy policy of the new German government; European regulations; Legislation on energy supply; Energy supply and cartel law; Regional supply in the East German states. [German] Der Taetigkeitsbericht der ARE befasst sich mit folgenden Themen: Gesamtwirtschaftliche Entwicklung und ihre Auswirkung auf die Energiewirtschaft, Oeffnung des Monopoles fuer Strom und Gas, Wettbewerb der regionalen Energieversorger, Energiepolitik der neuen Bundesregierung, Europaeische Richtlininen, energiewirtschaftsrecht, Versorgungswirtschaft und Kartellrecht und der Regionalversorgung in den neuen Bundeslaendern.

  7. Utility requirements for fusion power

    International Nuclear Information System (INIS)

    DeBellis, R.J.

    1977-03-01

    A four-man month study was undertaken to identify utility requirements of fusion power and define a role for the utilities in the fusion development process during the 1980s. This report, preliminary in nature, serves mainly as a planning document for future requirements analyses. A requirements organization was defined to consist of three major chronological phases: research and development, plant installation, and plant operation. Thirty-seven requirements were identified, covering all categories. In addition, training, environment, safety, licensing, and utility model were identified as five matrix-type requirements. As the requirement definition process continued during the study period, comments received from utility representatives revealed a consistency of key issues in the fusion development process. These issues form the basis for the eventual establishment of definitive roles for the utilities during the 1980s. The issues are not meant to reflect a negative view of fusion, but are items that must be solved before fusion can be introduced commercially as an electrical power source. As a result of this requirements study, preliminary candidate roles for the utilities in the fusion development process during the 1980s were identified as public education, commercialization studies, industry investment analyses, training plan implementation, alternate reactor concept development, ERDA concept design review, and requirements refinement

  8. Price formation and market power in the German wholesale electricity market in 2006

    International Nuclear Information System (INIS)

    Weigt, Hannes; Hirschhausen, Christian von

    2008-01-01

    From 2002 to 2006, German wholesale electricity prices more than doubled. The purpose of this paper is to estimate the price components in 2006 in order to identify the factors responsible for the increase. We develop a competitive benchmark model, taking into account power plant characteristics, fuel and CO 2 -allowance prices, wind generation, cross-border flows, unit commitment, and startup conditions, to estimate the difference between generation costs and observed market prices for every hour in 2006. We find that prices at the German wholesale market (European Energy Exchange - EEX) are above competitive levels for a large fraction of the observations. We verify the robustness of the results by carrying out sensitivity analyses. We also address the issue of revenue adequacy. (author)

  9. Citizen utilities: The emerging power paradigm

    International Nuclear Information System (INIS)

    Green, Jemma; Newman, Peter

    2017-01-01

    The emergence of citizen-based power systems in an integrated grid has been anticipated for decades. We can reveal how this is emerging in practice due to the significant uptake of solar photovoltaics (solar PV) and now battery storage in Perth, Australia. The high cost of electricity, high radiant energy levels and easy access to cheap Chinese technology, has led to dramatic buying during Perth's recent boomtown years. The traditional uni-directional power system is rapidly disrupting and this paper assesses where this may lead and what it means for the grid. Results of detailed monitoring in a solar powered house along with the impact of a battery storage system show the impact on the traditional grid is substantial but it will still be needed and must therefore adapt to the new distributed, bi-directional energy system. Surveys and price trajectories reveal how the trends to solar power storage will continue and how a citizen utility paradigm will emerge as the future grid building block using new blockchain support systems. Responses from utilities are then see to be fight, flight or innovate. - Highlights: • Citizen based power systems are emerging in Perth, Western Australia. • Solar power and battery storage systems are disrupting traditional utilities. • The grid will still have a role in the new, distributed power system. • The new system will lead to economic localism and the democratisation of power.

  10. Nuclear power and the opting-out policy of the German Government. A matter of responsibility and controversy

    International Nuclear Information System (INIS)

    Grawe, J.; Voss, A.

    2000-01-01

    The article critically reviews the energy policy of the German Government and the plans for winding down nuclear power generation and instead pursue a policy for a ''green reshufflement'' of generation technologies, providing for incentives to switch to options for decentralized power generation with enhanced use of renewable energy sources. The article explains arguments against the Government's opting-out policy which were laid down in a memorandum presented to the Government by a group of five university professors, among them the authors of this article who, as experts in this domain, are aware of their responsibility as scientists and members of society and therefore explain their view of the policy issues, also referring to a recent expert opinion of the German Wissenschaftsrat (science council), which recommended to continue nuclear energy research programmes and nuclear power generation. (orig./CB) [de

  11. Advanced energy utilization MHD power generation

    International Nuclear Information System (INIS)

    2008-01-01

    The 'Technical Committee on Advanced Energy Utilization MHD Power Generation' was started to establish advanced energy utilization technologies in Japan, and has been working for three years from June 2004 to May 2007. This committee investigated closed cycle MHD, open cycle MHD, and liquid metal MHD power generation as high-efficiency power generation systems on the earth. Then, aero-space application and deep space exploration technologies were investigated as applications of MHD technology. The spin-off from research and development on MHD power generation such as acceleration and deceleration of supersonic flows was expected to solve unstart phenomena in scramjet engine and also to solve abnormal heating of aircrafts by shock wave. In addition, this committee investigated researches on fuel cells, on secondary batteries, on connection of wind power system to power grid, and on direct energy conversion system from nuclear fusion reactor for future. The present technical report described results of investigations by the committee. (author)

  12. Utility requirements for fusion power

    International Nuclear Information System (INIS)

    DeBellis, R.J.

    1977-03-01

    A four-man-month study, jointly funded by EPRI and McDonnell Douglas Astronautics Company-EAST, was undertaken to identify the utility requirements of fusion power and define a role for the utilities in the fusion development process during the 1980's. This report, preliminary in nature, serves mainly as a planning document for future requirements analyses. A requirements organization was defined to consist of three major chronological phases: research and development, plant installation, and plant operation. Thirty-seven requirements were identified, covering all categories. In addition, training, environment, safety, licensing, and utility model were identified as five matrix-type requirements. As the requirement definition process continued during the study period, comments received from utility representatives revealed a consistency of key issues in the fusion development process. These issues form the basis for the eventual establishment of definitive roles for the utilities during the 1980's. The issues are not meant to reflect a negative view of fusion, but are items which must be solved before fusion can be introduced commercially as an electrical power source. As a result of this requirements study, preliminary candidate roles for the utilities in the fusion development process during the 1980's were identified as public education, commercialization studies, industry investment analyses, training plan implementation, alternate reactor concept development, ERDA concept design review, and requirements refinement

  13. www.kernenergie.de - nuclear power has a German Internet address

    International Nuclear Information System (INIS)

    Anon.

    2000-01-01

    www.kernenergie.de is the address on the worldwide web under which the German nuclear organizations, Deutsches Atomforum (DAtF), Informationskreis Kernenergie (IK), and Kerntechnische Gesellschaft (KTG) as well as atw - internationale Zeitschrift fuer Kernenergie, and INFORUM can be reached. Extensive sources of information, discussions, on-line dictionaries, computer codes, dynamic web pages, digital documents and multimedia offerings can be called up via the portal under the individual web sites. In this way, www.kernenergie.de provides a comprehensive and up-to-date background of information about nuclear power and adjacent topics in the digital worldwide web. (orig.) [de

  14. German risk study on nuclear power stations. Phase B

    International Nuclear Information System (INIS)

    1989-11-01

    The German Risk Study on Nuclear Power Stations is concerned with investigations of accidents in nuclear facilities and their associated risks. These investigations are undertaken on behalf of the federal Minister of Research and Technology. They have been broken down into two phases (Phase A and Phase B). The results of Phase A were published in 1979 (GRS 79). This report contains a summary of the investigations relating to Phase B. After an introduction setting out the basic principles and aim of the study, a general review will be given of the most important results. The course of the investigations and the results have already been published in a Technical Report (GRS 89). (author)

  15. The Franko-German aproach for a nuclear power plant in Turkey

    International Nuclear Information System (INIS)

    Ruess, F.

    1994-01-01

    Nuclear Power International (N P1) has been established as a joint subsidiary of Siemens and Framatome in 1989, thereby combining the experience accumulated in both parent companies with more than 100,000 MW capacity installed or on order in nuclear field. We intend to compete in a potential nuclear power project in Turkey on the basis of the German Pressurized Water Reactor Technology. We intend to establish a Consortium which on the foreign suppliers side will include Siemens, Framatome and GEC-Alsthom. In addition to the foreign partners in the Consortium we will include the Turkish industry in our proposal in order to achieve a maximum possible local content, which in our previous proposal was in the range of 30 % of the contract-value

  16. Operating experiences with passive systems and components in German nuclear power plants

    International Nuclear Information System (INIS)

    Maqua, M.

    1996-01-01

    Operating experience with passive systems and components is limited to the equipment installed in existing NPPs. In German power plants, this experience is available for equipment of the IAEA categories A, C and D. The presentation is focused on typical examples out of these three categories. An overview is given on the number of reported events and typical failure modes. Selected failures are discussed in detail. 1 ref., 6 figs, 7 tabs

  17. Operating experiences with passive systems and components in German nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Maqua, M [Gesellschaft fuer Anlagen- und Reaktorsicherheit mbH (GRS), Koeln (Germany)

    1996-12-01

    Operating experience with passive systems and components is limited to the equipment installed in existing NPPs. In German power plants, this experience is available for equipment of the IAEA categories A, C and D. The presentation is focused on typical examples out of these three categories. An overview is given on the number of reported events and typical failure modes. Selected failures are discussed in detail. 1 ref., 6 figs, 7 tabs.

  18. Plant life extensions for German nuclear power plants? Controversial discussion on potential electricity price effects

    International Nuclear Information System (INIS)

    Matthes, Felix C.; Hermann, Hauke

    2009-06-01

    The discussions on electricity price effects in case of the plant life extension of German nuclear power plants covers the following topics: (1) Introduction and methodology. (2) Electricity generation in nuclear power plants and electricity price based on an empirical view: electricity generation in nuclear power plants and final consumption price for households and industry in the European Union; electricity generation in nuclear power plants and electricity wholesale price in case of low availability of nuclear power plants in Germany; comparison of electricity wholesale prices in Germany and France. (3) Model considerations in relation to electricity prices and nuclear phase-out. (4) Concluding considerations.

  19. The future of nuclear power: An IAEA perspective. Address at the German atomic forum, Berlin, 27 January 2000

    International Nuclear Information System (INIS)

    ElBaradei, M.

    2000-01-01

    In his address at the German Atomic Forum (Berlin, 27 January 2000), the Director General of the IAEA presented a survey of the prospects for nuclear power as seen from the perspective of the IAEA. The speech focussed on the following aspects: nuclear power and world energy requirements, nuclear and radiation safety, competitiveness of nuclear power, and public support

  20. Organizing nuclear power plant operation

    International Nuclear Information System (INIS)

    Adams, H.W.; Rekittke, K.

    1987-01-01

    With the preliminary culmination in the convoy plants of the high standard of engineered safeguards in German nuclear power plants developed over the past twenty years, the interest of operators has now increasingly turned to problems which had not been in the focus of attention before. One of these problems is the organization of nuclear power plant operation. In order to enlarge the basis of knowledge, which is documented also in the rules published by the Kerntechnischer Ausschuss (Nuclear Technology Committee), the German Federal Minister of the Interior has commissioned a study of the organizational structures of nuclear power plants. The findings of that study are covered in the article. Two representative nuclear power plants in the Federal Republic of Germany were selected for the study, one of them a single-unit plant run by an independent operating company in the form of a private company under German law (GmbH), the other a dual-unit plant operated as a dependent unit of a utility. The two enterprises have different structures of organization. (orig.) [de

  1. Voltage and reactive power in the 380/220 kV power network of the new German Laender - state and prospects. Spannung und Blindleistung im 380/220-kV-Verbundnetz der neuen Bundeslaender - Stand und Ausblick

    Energy Technology Data Exchange (ETDEWEB)

    Behnke, M; Luettig, K; Radtke, H [Verbundnetz Elektroenergie AG, Berlin (Germany)

    1991-01-01

    With the preparation for restoring a German power network after nearly 40 years of separate development of the EES of the former DDR, the voltage/reactive power regulation must be examined and evaluated in the conditions of: - parting the connections to the present VES partners Poland and Czechoslovakia with the option of rectification - taking up parallel operation with the adjacent network undertakings of the old West German Laender (Preussen Elektra AG and Bayernwerke AG), ie: combined operation with DVG (superregional network of old West German Laender) and UCPTE (European electrical energy union). The aim is to configure this in the 380/220 kV network of the new German Laender, so that with a regionally compensated reactive power system, the voltage can be kept steady much better at times of heavy and light load, and the network losses can be reduced. (orig./GL).

  2. Imagined Modernity. Nuclear Power and West German Society in the 1960s

    International Nuclear Information System (INIS)

    Metzler, G.

    2012-01-01

    In 1969 the first commercial nuclear power plant went into operation in West Germany, making the country a latecomer (compared to other Western countries) in the civilian use of nuclear energy. Yet, in the late 1950s and 1960s, nuclear energy played a major part in public debates on energy supply, on science and technology policy, and the relationship between state and the economy. The civilian use of atomic energy also served as a source of national identity and a projection of modernity. The paper seeks to connect analyses of technical, economic, political, and cultural developments, in order to assess the overall impact of nuclear power on West German society. (author)

  3. Power exchanges in the German market: an initial assessment; Bourses d'electricite sur le marche Allemand - premieres evaluations

    Energy Technology Data Exchange (ETDEWEB)

    Dinko, Raytchev [Universite de Montesquieu Bordeaux-4, Lab. d' Analyse et de Recherche en Economie-Economie et Finance Internationales LAREefi, 33 (France)

    2002-11-01

    The emergence of power exchanges is one of the key phenomena accompanying the liberation of the electricity industry. Apart from the Nordic countries, this is a recent event, especially for the countries of continental Europe. In this study, we will be focusing on the German electricity market for several reasons. Firstly, Germany has the largest market for electrical power in Europe. As the electricity sector is in the process of opening up to competition, this country is one of the 'good pupils' in the field of electrical deregulation. Next, it is a good idea to draw up an initial overview of the German experience following the launch on 27.11.2001 of an organised market in France (the PowerNext exchange). Currently, there are three exchanges able to negotiate contracts in the German hub: the Amsterdam Power Exchange (APX), the European Energy (EEX) and the Leipzig Power Exchange (LPX). The exchanges were created between May 1999 (APX) and August 2000 (EEX). They are in a situation of direct competition in the German market. This competition is particularly keen since the three players are well aware of the challenge at stake: becoming the leading exchange for the German market and (possibly) in a future integrated European market. The announcement of a merger between LPX and EEX in 2002 (published on 26.10.2001 on the sites of both exchanges) underlines the importance of these strategic issues. The purpose of this work is to carry out an assessment of the three exchanges during their first months in existence. Using an econometric analysis, we offer conclusions concerning the capacity of these exchanges to supply a reference price. The opportunities for arbitration are also examined. Despite the difficulties of the market launches, the exchanges have successfully maintained a certain degree of coherence in their prices and may now sit back a little and plan their expansion. It is difficult at this stage to see who the eventual 'winner' will

  4. Optimal pricing of non-utility generated electric power

    International Nuclear Information System (INIS)

    Siddiqi, S.N.; Baughman, M.L.

    1994-01-01

    The importance of an optimal pricing policy for pricing non-utility generated power is pointed out in this paper. An optimal pricing policy leads to benefits for all concerned: the utility, industry, and the utility's other customers. In this paper, it is shown that reliability differentiated real-time pricing provides an optimal non-utility generated power pricing policy, from a societal welfare point of view. Firm capacity purchase, and hence an optimal price for purchasing firm capacity, are an integral part of this pricing policy. A case study shows that real-time pricing without firm capacity purchase results in improper investment decisions and higher costs for the system as a whole. Without explicit firm capacity purchase, the utility makes greater investment in capacity addition in order to meet its reliability criteria than is socially optimal. It is concluded that the non-utility generated power pricing policy presented in this paper and implied by reliability differentiated pricing policy results in social welfare-maximizing investment and operation decisions

  5. Chemistry of water and steam in power plants and related technologies. Glossary of terms and definitions English - German; German - English

    Energy Technology Data Exchange (ETDEWEB)

    Schmitz, H.P.; Teutenberg, U.

    2006-07-01

    This new edition of a technical dictionary is an evaluation of the technical terms found in the domestic and foreign literature and in information brochures of specialist firms, directives, guidelines, standards, etc. This dictionary contains more than 3,000 terms mainly with definitions with respect to the chemistry of water and steam in power plants along with the related types of water (untreated water, feedwater and boiler water, make-up water, waste water) and the water treatment processes (ion exchange, membrane process, etc.), water conditioning and chemical analysis, internal cleaning of steam generating plants (e.g. flushing, boiling-out, pre-operational and operational acid cleaning, steam blowing) as well as fundamentals of water chemistry. The technical knowledge of the authors, Heinz-Peter Schmitz, FDBR, with more than 25 years professional experience as translator/official in charge of documentation and Ulrich Teutenberg, Babcock/Hitachi with more than 30 years professional experience as senior consultant for water chemistry and commissioning is reflected in this dictionary. Part 1 contains the English-German version, Part 2 the German-English version. (orig.)

  6. The German Market for photovoltaic (solar-produced electricity)

    International Nuclear Information System (INIS)

    1999-06-01

    In preparation for reducing the CO2 emission and in so living up to the Kyoto-protocol with the succeeding changes, renewable energy has - including photovoltaic - got an increasing importance in the world over - especially in Germany. If the technical potentials in Germany are utilized optimally, then 75% of the total German electricity production with photovoltaic are covered. At the moment it is only about 1 per thousand. There is a political will to promote photovoltaic in Germany, which results in high account prices and different plant supporting programmes. In the coming 6 years the official aim is that a minimum of 100.000 photovoltaic power plants are installed with an average capacitate for 3 kWp. The competition for the market is hard. There are many national and international suppliers, so the co-operations between the large German producers seem to be obvious. (EHS)

  7. Utility experience in reactor noise analysis in German LWRs

    International Nuclear Information System (INIS)

    Schuette, A.; Weingarten, J.; Wach, D.

    1988-01-01

    Reactor noise analysis has a long history in Fed. Rep. of Germany. Since the early 60ies it was directed to early fault, malfunction and anomaly detection in nuclear power plants. When successful diagnoses showed the high potential and benefits including economic and safety aspects, also the utilities began to have a vivid concern in application of the developed methods and systems. The know-how transfer from specialized teams to the onsite personnel as well as the development of more ''intelligent'' online systems are important present and future tasks for further improvement of their efficiency. The diagnostic group of GRS is active in both fields and has close cooperation with several utilities to achieve these objectives. Modern signal processing equipment and access to a comprehensive knowledge base stored in data banks are provided by the data analysis center of GRS. The available capabilities are described and examples of analysis results within the cooperation utilities/GRS are given. (author)

  8. Power situation in German and lessons for Japan. Expanding renewable energy and fluctuating FIT system

    International Nuclear Information System (INIS)

    Kitamura, Kazuya

    2016-01-01

    In Germany, energy shift has now caused that a quarter of the total consumed power is obtained from renewable energy sources. There, a shift from nuclear energy has been achieved, and the dissemination of renewable energy as industrial creation has been demanded. However, the Renewable Energy Act, which was the promoter of the above process, was revised drastically in August 2014. Although evaluation on the revised Renewable Energy Act is a future work, it is said that this revision is quite severe for the parties who have promoted the renewable energy business in local regions and enjoyed the profiles locally. Regarding electricity, the German government has a strong industrial protection policy. This paper summarized the basic stance of the German government, by taking up the specific examples of actual electricity fee and the reduction/exemption system of levies on power consumption type companies. The German government clearly shows its willingness to adhere to be an industrial nation. In Germany, the wholesaling spot price of electricity declined due to the spread of renewable energy. This also comes from the mechanism of the FIT system. Unlike Germany where FIT system started in 2000, levies are still small affecting less in Japan where the FIT system has just begun. However, in Germany, it is a big problem. In order to discuss the ideal way of FIT system in Japan, it is necessary to know as accurately as possible what the reality is, including about overseas precedents. (A.O.)

  9. 4th extension building of the German National Library in Leipzig. Geothermal power for the German legacy of literature; 4. Erweiterungsbau der Deutschen Nationalbibliothek in Leipzig. Geothermie fuer Deutsches Literaturerbe

    Energy Technology Data Exchange (ETDEWEB)

    Waurick, Thomas [Gebaeudetechnik Dresden GmbH (Germany). Technische Gebaeudeausruestung; Richter, Marcus [HGC Hydro-Geo-Consult, Freiberg (Germany). Bereich Geothermie

    2009-07-01

    The future heating and air conditioning of the fourth extension building and the book towers of the German National Library (Leipzig, Federal Republic of Germany) almost are performed by terrestrial heat exclusively. In the contribution under consideration, the authors report on the energetic supply of the house-technical plants of the German National Library. For this, long-distance heating, geothermal power as well as compression coldness are available. The long-distance heating should be used for heating, while the geothermal power should enable the sensitive cooling of the magazine surfaces. Compression coldness should compensate the latent cooling performance. On the basis of the determined load profiles, a plant concept was developed for the energy production. This concept consists of a combination of heat pump and refrigerator using geothermal power. An advantage of this concept is the parallel use of the cold water as climatic cold water in the operation of the heat pump. The same is valid for the waste heat in the operation of refrigerators.

  10. A French-German Energy Transition Alliance in Europe. The Case of the Power and Transport Sectors

    International Nuclear Information System (INIS)

    Pescia, Dimitri; Buck, Matthias; Berghmans, Nicolas; Meyer, Kerstin

    2017-01-01

    Both France and Germany have ratified the Paris Agreement on Climate Change and are pursuing broad, long-term strategies to deeply decarbonize their economies by 2050. (France aims to reduce GHG emissions by 75% and Germany by 80 to 95% relative to their 1990 levels.) This strong political commitment to fighting climate change is deeply rooted in values and beliefs of German and French citizens and enjoys broad public support in both countries. The French Transition Energetique and the German Energiewende form the backbones of their respective decarbonization strategies. Both envisage step-by-step changes in the energy system, encompassing the power, transport and heating and cooling sectors

  11. German concept and status of the disposal of spent fuel elements from German research reactors

    International Nuclear Information System (INIS)

    Komorowski, K.; Storch, S.; Thamm, G.

    1995-01-01

    Eight research reactors with a power ≥ 100 kW are currently being operated in the Federal Republic of Germany. These comprise three TRIGA-type reactors (power 100 kW to 250 kW), four swimming-pool reactors (power 1 MW to 10 MW) and one DIDO type reactor (power 23 MW). The German research reactors are used for neutron scattering for basic research in the field of solid state research, neutron metrology, for the fabrication of isotopes and for neutron activation analysis for medicine and biology, for investigating the influence of radiation on materials and for nuclear fuel behavior. It will be vital to continue current investigations in the future. Further operation of the German research reactors is therefore indispensable. Safe, regular disposal of the irradiated fuel elements arising now and in future operation is of primary importance. Furthermore, there are several plants with considerable quantities of spent fuel, the safe disposal of which is a matter of urgency. These include above all the VKTA facilities in Rossendorf and also the TRIGA reactors, where disposal will only be necessary upon decommissioning. The present paper report is concerned with the disposal of fuel from the German research reactors. It briefly deals with the situation in the USA since the end of 1988, describes interim solutions for current disposal requirements and then mainly concentrates on the German disposal concept currently being prepared. This concept initially envisages the long-term (25--50 years) dry interim storage of fuel elements in special containers in a central German interim store with subsequent direct final disposal without reprocessing of the irradiated fuel

  12. Utilization of psychiatric services by female military personnel changes since admission of women to all German Armed Forces military careers.

    Science.gov (United States)

    Zimmermann, Peter; Ströhle, Andreas; Langner, Franziska; Lanczik, Mario

    2010-07-01

    In 2001, women were admitted to all military careers in the German Armed Forces. This study examines whether the utilization of psychiatric services of female military personnel has changed since then. The central medical database of German military personnel for the years 2000 and 2006 was analyzed. Between 2000 and 2006, the percentage (based on the average totals of male and female military personnel) of consultations of primary care unit surgeons for psychiatric problems increased significantly for both male and female military personnel, this increase being more apparent for women than for men. Stress-related disorders showed the greatest rise. In 2006, as opposed to 2000, the total proportion of both outpatient and inpatient mental health treatment provided to female military personnel was significantly higher than for males, particularly regarding stress-related, affective and personality disorders. Gender-specific aspects should be considered more intensely in preventive and therapeutic psychiatric supply in the German Armed Forces.

  13. An analysis of electric utility embedded power supply costs

    International Nuclear Information System (INIS)

    Kahal, M.; Brown, D.

    1998-01-01

    There is little doubt that for the vast majority of electric utilities the embedded costs of power supply exceed market prices, giving rise to the stranded cost problem. Beyond that simple generalization, there are a number of crucial questions, which this study attempts to answer. What are the regional patterns of embedded cost differences? To what extent is the cost problem attributable to nuclear power? How does the cost of purchased power compare to the cost of utility self-generation? What is the breakdown of utility embedded generation costs between operating costs - which are potentially avoidable--and ownership costs, which by definition are ''sunk'' and therefore not avoidable? How will embedded generation costs and market prices compare over time? These are the crucial questions for states as they address retail-restructuring proposal. This study presents an analysis of generation costs, which addresses these key questions. A computerized costing model was developed and applied using FERC Form 1 data for 1995. The model analyzed embedded power supply costs (i.e.; self-generation plus purchased power) for two groups of investor-owned utilities, 49 non-nuclear vs. 63 nuclear. These two subsamples represent substantially the entire US investor-owned electric utility industry. For each utility, embedded cost is estimated both at busbar and at meter

  14. Electrolysis: Information and Opportunities for Electric Power Utilities

    Energy Technology Data Exchange (ETDEWEB)

    Kroposki, B.; Levene, J.; Harrison, K.; Sen, P.K.; Novachek, F.

    2006-09-01

    Recent advancements in hydrogen technologies and renewable energy applications show promise for economical near- to mid-term conversion to a hydrogen-based economy. As the use of hydrogen for the electric utility and transportation sectors of the U.S. economy unfolds, electric power utilities need to understand the potential benefits and impacts. This report provides a historical perspective of hydrogen, discusses the process of electrolysis for hydrogen production (especially from solar and wind technologies), and describes the opportunities for electric power utilities.

  15. Analysis and planning of the utilization of nuclear power plants

    International Nuclear Information System (INIS)

    Skvarka, P.

    1985-01-01

    The utilization coefficient as one of the characteristics of availability of nuclear power plants and the operation results (like maximum power, block number, and electric energy generation) are investigated by different statistic methods for several nuclear power plants with PWR type reactors and compared with those of WWER 440-type reactors. By means of linear many-parameter regression analysis the utilization coefficient is studied in dependence on block power and time after reactor commissioning. Forecastings of mean utilization coefficients are presented for the power of WWER 1000-type reactors

  16. Utilities' view on the fuel management of nuclear power plants

    International Nuclear Information System (INIS)

    Held, C.; Moraw, G.; Schneeberger, M.; Szeless, A.

    1977-01-01

    Utilities engagement in nuclear power requires an increasing amount of fuel management activities by the utilities in order to meet all tasks involved. These activities comprise essentially two main areas: - activities to secure the procurement of all steps of the fuel cycle from the head to the back end; - activities related to the incore fuel managment. A general survey of the different steps of the nuclear fuel cycle is presented together with the related activities and responsibilities which have to be realized by the utilities. Starting in the past, today's increasing utility involvement in the nuclear fuel management is shown, as well as future fuel management trends. The scope of utilities' fuel management activities is analyzed with respect to organizational aspects, technical aspects, safeguarding aspects, and financial aspects. Utilities taking active part in the fuel management serves to achieve high availability and flexibility of the nuclear power plant during the whole plant life as well as safe waste isolation. This can be assured by continuous optimization of all fuel management aspects of the power plant or on a larger scale of a power plant system, i.e., utility activities to minimize the effects of fuel cycle on the environment, which includes optimization of fuel behaviour, radiation exposure to public and personnel, and utility technical and economic evaluations of out- and incore fuel management. These activities of nuclear power producing utilities in the field of nuclear fuel cycle are together with a close cooperation with fuel industry as well as national and international authorities a necessary basis for the further utilization of nuclear power

  17. Strategy for utilizing nuclear power

    International Nuclear Information System (INIS)

    Martens, E.J.

    1977-01-01

    One of the national goals is to achieve independence in the area of energy supplies in the next few years. It is believed that attaining this goal will require extensive utilization of nuclear power in conventional fission reactors. It is proposed that the best way to develop the nuclear resource is through government ownership of the reactors. It is argued that this will minimize the risks associated with the nuclear-power option and clear the way for its exploitation

  18. Hydrogen and energy utilities

    Energy Technology Data Exchange (ETDEWEB)

    Hustadt, Daniel [Vattenfall Europe Innovation GmbH (Germany)

    2010-07-01

    Renewable electricity generation plays one major role with the biggest share being wind energy. At the end of the year 2009 a wind power plant capacity of around 26 GW was installed in Germany. Several outlooks come to the conclusion that this capacity can be doubled in ten years (compare Figure 1). Additionally the German government has set a target of 26 GW installed off-shore capacity in North and Baltic Sea until 2030. At Vattenfall only a minor percentage of the electricity production comes from wind power today. This share will be increased up to 12% until 2030 following Vattenfall's strategy 'Making Electricity Clean'. This rapid development of wind power offers several opportunities but also means some challenges to Utilities. (orig.)

  19. Gained experiences concerning the treatment of radioactive metal scrap from German NPP'S in Studsvik - Gained experience concerning the treatment of radioactive metal scrap from German nuclear power plants

    International Nuclear Information System (INIS)

    Westerwinter, Boris; Buckanie, Niemma

    2014-01-01

    The company Gesellschaft fuer Nuklear-Service mbH, Essen/Germany (GNS), operates on behalf of the utilities E.ON, RWE, EnBW and VENE since the nineteen-nineties - amongst its other duties - on the waste management of metal scrap which originates from German nuclear power plants. The main objective within this responsibility is to maximize the value of recyclable fractions for re-use while minimizing the resulting radioactive waste. To achieve the aforementioned objective, melting of metallic scrap proved to be an outstanding choice. The use of this technique combined with all accompanying processes and regulations is accepted by the competent authorities and independent experts as a qualified treatment method over the entire time period. The motivation of this paper is to reflect on the experiences gained concerning the planning, implementation and results, acquired by GNS by using the Studsvik service. The focus will be on characteristics within processing of such campaigns. (authors)

  20. Power plant engineering dictionary. Vol. 2. English-German. Pt. 1: Dictionary. Pt. 2: Abbreviations. 4. rev. and enlarged ed

    Energy Technology Data Exchange (ETDEWEB)

    1987-01-01

    The dictionary is a compilation of 6000 German and English technical terms of power plant engineering as far as power plants, turbine-generators and assembly engineering are concerned. It is meant to form a basis for uniform terminology on technical documents. The dictionary is the result of a joint effort of KWU and UPC.

  1. Delays help German utilities maintain self-financing ratios. [Financing nuclear power projects

    Energy Technology Data Exchange (ETDEWEB)

    Radtke, G [Dresden Bank, AG (Germany, F.R.)

    1979-05-01

    Estimates of electricity consumption have been substantially reduced and nuclear plant is now expected to be 22% of total generating capacity in 1985 instead of the earlier forecast of 36%. The decline in the ordering of new plant has benefited the financial position of the electricity utilities and the expected fall in self-financing ratios has not occurred.

  2. REDUCING POWER PRODUCTION COSTS BY UTILIZING PETROLEUM COKE

    Energy Technology Data Exchange (ETDEWEB)

    Kevin C. Galbreath; Donald L. Toman; Christopher J. Zygarlicke

    1999-09-01

    Petroleum coke, a byproduct of the petroleum-refining process, is an attractive primary or supplemental fuel for power production primarily because of a progressive and predictable increase in the production volumes of petroleum coke (1, 2). Petroleum coke is most commonly blended with coal in proportions suitable to meet sulfur emission compliance. Petroleum coke is generally less reactive than coal; therefore, the cofiring of petroleum coke with coal typically improves ignition, flame stability, and carbon loss relative to the combustion of petroleum coke alone. Although petroleum coke is a desirable fuel for producing relatively inexpensive electrical power, concerns about the effects of petroleum coke blending on combustion and pollution control processes exist in the coal-fired utility industry (3). The Energy & Environmental Research Center (EERC) completed a 2-year technical assessment of petroleum coke as a supplemental fuel. A survey questionnaire was sent to seven electric utility companies that are currently cofiring coal and petroleum coke in an effort to solicit specific suggestions on research needs and fuel selections. An example of the letter and survey questionnaire is presented in Appendix A. Interest was expressed by most utilities in evaluating the effects of petroleum coke blending on grindability, combustion reactivity, fouling, slagging, and fly ash emissions control. Unexpectedly, concern over corrosion was not expressed by the utilities contacted. Although all seven utilities responded to the question, only two utilities, Northern States Power Company (NSP) and Ameren, sent fuels to the EERC for evaluation. Both utilities sent subbituminous coals from the Power River Basin and petroleum shot coke samples. Petroleum shot coke is produced unintentionally during operational upsets in the petroleum refining process. This report evaluates the effects of petroleum shot coke blending on grindability, fuel reactivity, fouling/slagging, and

  3. Measures to remove impediments to better utilization. Renewable energy sources

    International Nuclear Information System (INIS)

    Diekmann, J.; Eichelbroenner, M.; Langniss, O.

    1997-01-01

    The utilization of renewable energy sources meets with a number of obstacles created in particular by economic framework conditions, regulatory provisions, lengthy administrative procedures, insufficient information, and to some part also to the reluctance of bankers and utilities. This is why an action programme was put underway by the Forum fuer Zukunftsenergien, together with the Berlin-based DIW (German economic research institute) and the Stuttgart-based DLR (German aerospace research institute), financed from public funds of the Federal Ministry of Economics. Under this programme, almost 900 operators of systems for electricity generation from wind power, hydropower, biomass, ambient heat, solar thermal energy and by photovoltaic conversion have been interviewed. Based on the information obtained, the article reveals the existing impediments and proposed action for overcoming the obstacles. (orig.) [de

  4. Franco-German nuclear cooperation

    International Nuclear Information System (INIS)

    Leny, J.C.; Huettl, A.

    1996-01-01

    Nuclear energy is the number one power source in the European Union. However, the first generation units would be replaced from the year 2010 onwards. In this prospect, Siemens and Framatome have drawn together in designing and commercializing a common product initially destined for the export market which has become the EPR (European Pressurized water Reactor) project. The two companies have floated with equal participation the NPI (Nuclear Power International) sub-company to manage this project. The French and German utilities participate to the financing of the project, at present at the basic stage, and the safety authorities of both countries have carried out a joint evaluation of EPR safety. With a 1500 Mwe capacity, EPR will be equipped with advanced safety systems more performing than the existing systems. Conceivers want to maintain the economic competitiveness of EPR with respect to coal power plants. EPR will take over the oldest power plants by producing a safer and cheaper energy to provide for the needs of the developed countries and then of the developing countries with no risk for the environment. An enormous effort of communication must be carried out to reduce the public anxiety and to calm down the nuclear debate and show up its merits, in particular in Europe, where its contribution is vital. (J.S.)

  5. Firing the furnace? An econometric analysis of utilities' fuel choice

    International Nuclear Information System (INIS)

    Tauchmann, H.

    2006-01-01

    This paper attempts to estimate how the fuel mix of German electricity producers does react to fuel price changes. The empirical analysis is based on panel data (1968-1998) of major utilities. Two different aspects of fuel choice are distinguished: at the one hand, the construction of usually fuel-specific capacities for electric power generation, i.e. investment decisions that determine the fuel mix in the long run; at the other, fuel use conditional on existing generation capacities, i.e. short-run inter-fuel substitution. According to the results from panel unit root tests, both the econometric models which describe these two aspects are specified in changes rather than levels. The partly discrete nature of investment decisions is taken into account, by constructing a discrete model of capacity adjustment. Our estimation results suggest that the fuel mix of electric utilities is price inelastic either if long-term investment or short-term inter-fuel substitution is considered. Finally, the empirical results are used to predict the potential impacts of CO 2 emissions trading on fuel choice in the German electric power industry

  6. Firing the furnace? An econometric analysis of utilities' fuel choice

    International Nuclear Information System (INIS)

    Tauchmann, H.

    2006-01-01

    This paper attempts to estimate how the fuel mix of German electricity producers does react to fuel price changes. The empirical analysis is based on panel data (1968-1998) of major utilities. Two different aspects of fuel choice are distinguished: at the one hand, the construction of usually fuel-specific capacities for electric power generation, i.e. investment decisions that determine the fuel mix in the long run; at the other, fuel use conditional on existing generation capacities, i.e. short-run inter-fuel substitution. According to the results from panel unit root tests, both the econometric models which describe these two aspects are specified in changes rather than levels. The partly discrete nature of investment decisions is taken into account, by constructing a discrete model of capacity adjustment. Our estimation results suggest that the fuel mix of electric utilities is price inelastic either if long-term investment or short-term inter-fuel substitution is considered. Finally, the empirical results are used to predict the potential impacts of CO 2 emissions trading on fuel choice in the German electric power industry. (Author)

  7. Utility-Marketing Partnerships: An Effective Strategy for Marketing Green Power?

    Energy Technology Data Exchange (ETDEWEB)

    Bird, L. A.; Brown, E. S.

    2006-04-01

    This paper explores whether partnerships between utilities and independent marketers are an effective strategy for marketing green power. We present case studies of voluntary and mandatory partnerships covering green power program design and implementation in both regulated and restructured electricity markets. We also include perspectives (based on interviews) from utilities, marketers, and regulators involved in developing and implementing these partnerships. From these case studies and interviews, we describe lessons learned about developing effective partnerships, including such issues as respective roles in marketing and administration, product branding, and contract and incentive structures. Based on experience to date, strategic partnerships between utilities and marketers can be an effective approach to marketing green power. Partnerships leverage the sales and resource procurement experience of marketers and the utility?s reputation and access to customers. Further, partnerships can create greater incentives for success because marketers have a vested financial interest in maximizing customer participation and green power sales.

  8. Utilization of excess wind power in electric vehicles

    International Nuclear Information System (INIS)

    Hennings, Wilfried; Mischinger, Stefan; Linssen, Jochen

    2013-01-01

    This article describes the assessment of future wind power utilization for charging electric vehicles (EVs) in Germany. The potential wind power production in the model years 2020 and 2030 is derived by extrapolating onshore wind power generation and offshore wind speeds measured in 2007 and 2010 to the installed onshore and offshore wind turbine capacities assumed for 2020 and 2030. The energy consumption of an assumed fleet of 1 million EVs in 2020 and 6 million in 2030 is assessed using detailed models of electric vehicles, real world driving cycles and car usage. It is shown that a substantial part of the charging demand of EVs can be met by otherwise unused wind power, depending on the amount of conventional power required for stabilizing the grid. The utilization of wind power is limited by the charging demand of the cars and the bottlenecks in the transmission grid. -- Highlights: •Wind power available for charging depends on minimum required conventional power (must-run). •With 20 GW must-run power, 50% of charging can be met by excess wind power. •Grid bottlenecks decrease charging met by wind power from 50 % to 30 %. •With zero must-run power, only very little wind power is available for charging

  9. The trend and precept of present nuclear energy policy in German

    International Nuclear Information System (INIS)

    Murakami, Takashi

    2000-01-01

    In German, the coalition political power of SPD and Gruene decided the present nuclear policy on 20th October 1998. It consisted of three steps: the first step is amendment of the present Atomic Energy Law, the second step the consensus conference with the power industry for one year and the third step is enactment of law to decrease nuclear power with compensation. The first consensus conference opened 26th January 1999. The content was that the stop of reprocessing did not decide the limit and the atomic power plants were operated until obtaining consensus. Then, Muller Secretary of Commerce and the power industry carried out unofficial meeting and decided the following: limit of operating atomic power plants is 35 years (until 2024), reprocessing can be done until 2004 and the undertakers do not request compensation to the governmental agencies. However the environmental secretary and Gruene objected to them. 570 of German scientists and technologists published memorandum for discussing the present conditions of German and the earth. England and France opposite limit of reprocessing spent fuel. A joint concern between Siemens (German) and Framatome (France) is going to establish. The point under discussion about present power policy is selection of energy. There are many problems in German. (S.Y.)

  10. The German power market. Data collection for model analysis

    Energy Technology Data Exchange (ETDEWEB)

    Munksgaard, J.; Alsted Pedersen, K.; Ramskov, J.

    2000-09-01

    In the present project the market scenario for analysing market imperfections has been the Northern European power market, i.e. a market including Germany as well. Consequently, one of the tasks in the project has been to collect data for Germany in order to develop the empirical basis of the ELEPHANT model. In that perspective the aim of this report is to document the data collected for Gemany, to specify the data sources used and further to lay stress on the assumptions which have been made when data have not been available. By doing so, transparency in model results is improved. Further, a basis for discussing the quality of data as well as a framework for future revisions and updating of data have been established. The data collected for Germany have been given by the exogenous variables defined by the ELEPHANT model. In that way data collection is a priori given by the specification of the model. The model includes more than 30 exogenous variables specified at a very detailed level. These variables include among others data on energy demand, detailed power production data and data on energy taxes and CO{sub 2} emission targets. This points to the fact that many kinds of data sources have been used. However, due to lack of data sources not all relevant data have been collected. One area in which lack of data has been significant is demand reactions to changes in energy prices, i.e. the different kinds of demand elasticities used in the production and consumer utility functions in the model. Concerning elasticities for German demand reactions no data sources have been available at all. Another area of data problems is combined heat and power production (so-called CHP production), in which only very aggregated data have been available. Lack of data or poor quality of data (e.g., data not up to date or data not detailed enough) has led to the use of appropriate assumptions and short cuts in order to establish the entire data basis for the model. We describe the

  11. The German power market. Data collection for model analysis

    International Nuclear Information System (INIS)

    Munksgaard, J.; Alsted Pedersen, K.; Ramskov, J.

    2000-09-01

    In the present project the market scenario for analysing market imperfections has been the Northern European power market, i.e. a market including Germany as well. Consequently, one of the tasks in the project has been to collect data for Germany in order to develop the empirical basis of the ELEPHANT model. In that perspective the aim of this report is to document the data collected for Gemany, to specify the data sources used and further to lay stress on the assumptions which have been made when data have not been available. By doing so, transparency in model results is improved. Further, a basis for discussing the quality of data as well as a framework for future revisions and updating of data have been established. The data collected for Germany have been given by the exogenous variables defined by the ELEPHANT model. In that way data collection is a priori given by the specification of the model. The model includes more than 30 exogenous variables specified at a very detailed level. These variables include among others data on energy demand, detailed power production data and data on energy taxes and CO 2 emission targets. This points to the fact that many kinds of data sources have been used. However, due to lack of data sources not all relevant data have been collected. One area in which lack of data has been significant is demand reactions to changes in energy prices, i.e. the different kinds of demand elasticities used in the production and consumer utility functions in the model. Concerning elasticities for German demand reactions no data sources have been available at all. Another area of data problems is combined heat and power production (so-called CHP production), in which only very aggregated data have been available. Lack of data or poor quality of data (e.g., data not up to date or data not detailed enough) has led to the use of appropriate assumptions and short cuts in order to establish the entire data basis for the model. We describe the

  12. [The boycott against German scientists and the German language after World War I].

    Science.gov (United States)

    Reinbothe, R

    2013-12-01

    After the First World War, the Allied academies of sciences staged a boycott against German scientists and the German language. The objective of the boycott was to prevent the re-establishment of the prewar dominance of German scientists, the German language and German publications in the area of international scientific cooperation. Therefore the Allies excluded German scientists and the German language from international associations, congresses and publications, while they created new international scientific organizations under their leadership. Medical associations and congresses were also affected, e. g. congresses on surgery, ophthalmology and tuberculosis. Allied physicians replaced the "International Anti-Tuberculosis Association" founded in Berlin in 1902 with the "Union Internationale contre la Tuberculose"/"International Union against Tuberculosis", founded in Paris in 1920. Only French and English were used as the official languages of the new scientific organizations, just as in the League of Nations. The boycott was based on the fact that the German scientists had denied German war guilt and war crimes and glorified German militarism in a manifesto "To The Civilized World!" in 1914. The boycott first started in 1919 and had to be abolished in 1926, when Germany became a member of the League of Nations. Many German and foreign physicians as well as other scientists protested against the boycott. Some German scientists and institutions even staged a counter-boycott impeding the resumption of international collaboration. The boycott entailed an enduring decline of German as an international scientific language. After the Second World War scientists of the victorious Western Powers implemented a complete reorganization of the international scientific arena, based on the same organizational structures and language restrictions they had built up in 1919/1920. At the same time scientists from the U.S.A. staged an active language and publication policy, in

  13. Plant life extensions for German nuclear power plants? Controversial discussion profit taking of nuclear power plant operators

    International Nuclear Information System (INIS)

    Matthes, Felix C.

    2009-10-01

    The discussion on the plant life extensions for German nuclear power plants beyond the residual quantity of electricity particularly focus on three aspects: Effects for the emission of carbon dioxide as a greenhouse gas; Development of the electricity price for which a reduction or attenuation is postulated due to a plant life extension; Skimming of additional profits at operating companies and their use in the safeguarding of the future (development of renewable energies, support of energy efficiency, promotion of the research, consolidation of the public budget, and so on). Under this aspect, the author of the contribution under consideration reports on the profit taking of nuclear power plant operators. The presented analysis considers three aspects: (a) Specification of the quantity structures for the investigated model of plant life extension; (b) The decisive parameter is the revenue situation and thus the price development for electricity at wholesale markets; (c) Determination and evaluation of the course in time of the profit taking.

  14. German Spent Nuclear Fuel Legacy: Characteristics and High-Level Waste Management Issues

    Directory of Open Access Journals (Sweden)

    A. Schwenk-Ferrero

    2013-01-01

    Full Text Available Germany is phasing-out the utilization of nuclear energy until 2022. Currently, nine light water reactors of originally nineteen are still connected to the grid. All power plants generate high-level nuclear waste like spent uranium or mixed uranium-plutonium dioxide fuel which has to be properly managed. Moreover, vitrified high-level waste containing minor actinides, fission products, and traces of plutonium reprocessing loses produced by reprocessing facilities has to be disposed of. In the paper, the assessments of German spent fuel legacy (heavy metal content and the nuclide composition of this inventory have been done. The methodology used applies advanced nuclear fuel cycle simulation techniques in order to reproduce the operation of the German nuclear power plants from 1969 till 2022. NFCSim code developed by LANL was adopted for this purpose. It was estimated that ~10,300 tonnes of unreprocessed nuclear spent fuel will be generated until the shut-down of the ultimate German reactor. This inventory will contain ~131 tonnes of plutonium, ~21 tonnes of minor actinides, and 440 tonnes of fission products. Apart from this, ca.215 tonnes of vitrified HLW will be present. As fission products and transuranium elements remain radioactive from 104 to 106 years, the characteristics of spent fuel legacy over this period are estimated, and their impacts on decay storage and final repository are discussed.

  15. French and German Wind Market Perspectives. Senvion User Group 2014, Berlin

    International Nuclear Information System (INIS)

    Persem, Melanie

    2014-01-01

    This document presents some key figures about the French and German Wind energy Market: electricity production and Wind Power Capacity in France and Germany, the Goals for Renewable energies and the Goals for Wind Power and Job Perspectives in the French and German energy Transitions, the Political Framework and its Impacts on Wind Onshore Market and on the energy Transition in general, the French and German Models of Wind Power Financing, the commercial Models for Renewable energy Installations in Germany in 2013, the renewable energy sources (ReS) Financial Model and the Distribution of Costs, and the future challenges and difficulties of RES and Onshore Wind Power Development

  16. The availability of German nuclear power plants and possible further improvements

    International Nuclear Information System (INIS)

    Hennies, H.H.

    1985-01-01

    West Germany's 19 nuclear power plants with a capacity of 17,000 MW are actually producing about 30% of the public electricity generation. In 1984 they produced 93 billion kWh; three plants produced more than 10 billion kWh each. Most of the plants are Pressurized Water Reactors (PWR), some are Boiling Water reactors (BWR), of which the largest units went into operation recently. Considering the availability of German nuclear power plants meanwhile achieved no major systems modifications or changes in materials used are required for the time being. Instead, plant standardization is the target to be pursued. This paper discusses that the standardization of the plants allows to set up a spare part pool not just for one unit but for a parc of units. With experience of operation, maintenance and repair accumulating it is possible to have tool and repair procedures prepared well in advance for all foreseeable incidents. More optimized and automated equipment for refueling is under development to reduce even further the present annual refueling time of 30 days

  17. Viewpoint of utilities regarding fuel management of nuclear power plants

    International Nuclear Information System (INIS)

    Held, C.; Moraw, G.; Schneeberger, M.; Szeless, A.

    1977-01-01

    The engagement of utilities in nuclear power requires them to engage in an increasing amount of fuel management activities in order to carry out all the tasks involved. Essentially, these activities involve two main areas: The procurement of all steps of the fuel cycle from the head to the back end; and in-core fuel management. A general survey of the different steps of the nuclear fuel cycle is presented together with the related activities and responsibilities which have to be borne by the utilities. Today's increasing utility involvement in the nuclear fuel management is shown, as well as future fuel management trends. The fuel management activities of the utilities are analysed with respect to organizational, technical, safeguarding, and financial aspects. The active participation of the utilities in fuel management helps to achieve high availability and flexibility of the nuclear power plant during its whole life as well as safe waste isolation. This can be ensured by continuous optimization of all fuel management aspects of the power plant or, on a larger scale, of a power plant system, i.e. activities by utilities to minimize fuel-cycle effects on the environment, which include optimization of fuel behaviour, and radiation exposure to the public and personnel; and technical and economic evaluations by utilities of out- and in-core fuel management. (author)

  18. Experience in commissioning and scientific support of nuclear power plant operation in the German Democratic Republic

    International Nuclear Information System (INIS)

    Ackermann, G.; Endler, A.; Loth, K.H.

    1983-01-01

    In the German Democratic Republic two nuclear power plants equipped with four pressurized-water WWER-440-type reactors were commissioned in the years 1973-1979 and have since been in routine operation. The nuclear power plants (NPPs) in the GDR were constructed on the basis of projects developed and tested in the Soviet Union. Their main equipment was also supplied by the USSR. Under the technical supervision of USSR scientific institutions and design organizations, the construction, commissioning and operation of NPPs had to be prepared and organized by the design organizations, scientific institutions and the prospective user in the German Democratic Republic. To this effect, and to ensure nuclear safety, availability and maximum exploitation of nuclear fuel, it was necessary to develop national scientific capacities. The organizations of the USSR supply basic and supplementary documents prescribing the required extent of investigations to prove that the equipment and systems will meet the projected and operational conditions from loading to commercial operation. Concrete test programmes for commissioning and operational instructions are elaborated by national organizations. Pre-operational and initial startup tests are performed by the personnel of the plant, of enterprises and scientific institutions under the technical supervision of the design organizations of the USSR and the German Democratic Republic. Proceeding from experience gained for more than 15 years in the scientific support of commissioning and operation, the required training and disciplines of personnel are reported. The tasks to be met by the various disciplines are described. Furthermore, information is given on the main stages of commissioning and on a number of results. Finally, selected results of work in connection with operational assistance are reported

  19. Dynamic Power Management for Portable Hybrid Power-Supply Systems Utilizing Approximate Dynamic Programming

    Directory of Open Access Journals (Sweden)

    Jooyoung Park

    2015-05-01

    Full Text Available Recently, the optimization of power flows in portable hybrid power-supply systems (HPSSs has become an important issue with the advent of a variety of mobile systems and hybrid energy technologies. In this paper, a control strategy is considered for dynamically managing power flows in portable HPSSs employing batteries and supercapacitors. Our dynamic power management strategy utilizes the concept of approximate dynamic programming (ADP. ADP methods are important tools in the fields of stochastic control and machine learning, and the utilization of these tools for practical engineering problems is now an active and promising research field. We propose an ADP-based procedure based on optimization under constraints including the iterated Bellman inequalities, which can be solved by convex optimization carried out offline, to find the optimal power management rules for portable HPSSs. The effectiveness of the proposed procedure is tested through dynamic simulations for smartphone workload scenarios, and simulation results show that the proposed strategy can successfully cope with uncertain workload demands.

  20. Issues related to gas use by European power utilities

    International Nuclear Information System (INIS)

    Jonchere, J.P.

    1992-01-01

    Gas-fired combined cycle frequently appears as a least-cost option for newly built power plants. Moreover, this option also brings obvious environmental benefits. But, power utilities, facing unavoidable long term uncertainties about electricity demand are not at ease with long term commitments such a a take-or-pay formula or a price indexation not reflecting the market place in the power generation industry. Due to the flexibilities in the management of existing power plants (deferred closures, etc...) or even on the demand side (load shifting, peak clipping, etc...), early decision making is not compulsory. Therefore, a gas breakthrough in the power sector interfuel competition will require a mutual understanding of constraints and flexibilities faced by partners: gas sellers and power utilities. A fair rent sharing between them would certainly be a prerequisite to a large but possibly temporary access of natural gas to the European power sector. 4 refs., 1 fig., 2 tabs

  1. Power quality enhancement at distribution level utilizing the unified power quality conditioner (UPQC)

    Science.gov (United States)

    Khadkikar, Vinod

    The present doctoral work is based on the philosophy of optimal utilization of the available resources in a most effective and efficient way to improve the product efficiency and to reduce the overall cost. This work proposes a novel control philosophy termed as power angle control (PAC), in which both the series and shunt inverters share the load reactive power in co-ordination with each other without affecting the basic UPQC compensation capabilities. This eventually results in a better utilization of the series inverter, reduction in the shunt inverter rating to some extent and ultimately in the reduction of the overall cost of UPQC. Moreover, in this thesis work several other control approaches are also proposed, such as, unit vector template generation, quadrature voltage injection, generalized single-phase p-q theory and novel current unbalance compensation approach. All the developed concepts are successfully validated through digital simulation as well as extensive experimental investigations. Keywords. power quality, active power filter, unified power quality conditioner, reactive power compensation, harmonics compensation.

  2. Hydroelectric power utilization of the River Crna Reka

    International Nuclear Information System (INIS)

    Ivanova-Davidovikj, Jasna

    2001-01-01

    In the paper several feasibility studies for rational use of the Macedonian River Crna Reka, developed by foreign companies are analysed. The utilization of the hydro-power potential of the River Crna Reka is predicted to be by realization of two hydroelectric power plants with total capacity of 450 MW, as well as annual electric power generation of 600 GWh. This two HPPs will facilitate the development of the Macedonian electric power system

  3. Impact of power purchases from non-utilities on the utility cost of capital

    International Nuclear Information System (INIS)

    Kahn, E.; Stoft, S.; Belden, T.

    1995-01-01

    The bond rating agencies in the USA have asserted that long-term power purchase contracts between non-utility generators and utilities are the equivalent of debt to the utilities, and therefore raise the cost of capital to the purchaser. Non-Utility generators claim that these contracts reduce risk to the utilities. This debate is reflected in the 1992 Energy Policy Act. This paper investigates this controversy from the perspective of the equity markets. Using a CAPM framework, various specifications of the cost of equity capital are estimated, to shed light on this question. No evidence is found for the hypothesis that non-utility generation contracts raise the cost of capital. There does appear to be a slight increase in this cost for those utilities seeking to build their own generation capacity as opposed to purchasing it from non-utility suppliers. (author)

  4. Industry 4.0: The Digital German Ideology

    Directory of Open Access Journals (Sweden)

    Christian Fuchs

    2018-02-01

    Full Text Available Especially in Germany, a vivid public debate about “industry 4.0” has developed in recent years. It advances the argument that industry 4.0 is the fourth industrial revolution that follows on from technological revolutions brought about by water and steam power (industrial revolution 1.0, electric power (industrial revolution 2.0, and computing/computerised automation (industrial revolution 3.0. In 1845/46, Marx and Engels wrote The German Ideology. 170 years later, we live in the time of digital capitalism that has its own peculiar forms of ideology. This paper argues that “industry 4.0” is the new German ideology, the digital German ideology. Image: By ChristophRoser, AllAboutLean.com, CC BY-SA 4.0, via Wikimedia Commons

  5. Utilization of solar and nuclear energy for hydrogen production

    International Nuclear Information System (INIS)

    Fischer, M.

    1987-01-01

    Although the world-wide energy supply situation appears to have eased at present, non-fossil primary energy sources and hydrogen as a secondary energy carrier will have to take over a long-term and increasing portion of the energy supply system. The only non-fossil energy sources which are available in relevant quantities, are nuclear energy, solar energy and hydropower. The potential of H 2 for the extensive utilization of solar energy is of particular importance. Status, progress and development potential of the electrolytic H 2 production with photovoltaic generators, solar-thermal power plants and nuclear power plants are studied and discussed. The joint German-Saudi Arabian Research, Development and Demonstration Program HYSOLAR for the solar hydrogen production and utilization is summarized. (orig.)

  6. ["Maintaining a Common Culture"--the German Research Foundation and the Austrian-German scientific aid in the interbellum].

    Science.gov (United States)

    Fengler, Silke; Luxbacher, Günther

    2011-12-01

    After the end of the Great War, private as well as public research funding in Austria was anaemic and slow to develop. Whereas the German state-funded Deutsche Forschungsgemeinschaft (DFG) was established as early as 1920, first steps in that direction were only taken in Austria in the late 1920s. In 1929, the Osterreichisch-deutsche Wissenschaftshilfe (ODW) was founded under the auspices of the Austrian Academy of Sciences and the DFG. Although prima facie on an equal footing, the new research funding organisation was in fact highly dependent on its German cooperation partner. The article explores for the first time ODW's position within the German and Austrian science and foreign policies, which aimed to promote the idea of unification of both states within the German Reich. A quantitative analysis of the subsidies policy in the first five years of existence shows that the ODW gave financial aid primarily to conservative research fields, affecting the intellectual balance of power in the First Austrian Republic. Policy continuities and discontinuities of the organisation in the course of the national-socialist rise to power in Germany after 1933 are examined in the second part of the article. The article thus both increases our knowledge about the most important German research funding organisation DFG, and identifies some of the fundamental structural features of Austrian science policy in the interwar years.

  7. Basic aspects and results of the German risk study

    International Nuclear Information System (INIS)

    Bayer, A.; Heuser, F.W.

    1981-01-01

    This article presents an overview of the investigations and results of the German Risk Study (Phase A). Similar to its American counterpart [Reactor Safety Study (WASH-1400)], the German Risk Study assesses the societal risks associated with potential accidents in nuclear power plants sited in the Federal Republic of Germany. The technical part of the analysis was performed for a representative pressurized-water-reactor nuclear power plant of the 1300-MW(e) class. For the risk assessment, 19 sites were considered, with a total of 25 reactor units presently in operation, under construction, or undergoing the licensing procedure. In the spring of 1981 a translation of the main report [German Risk Study-Main Report (EPRI-NP-1804-SR)], including the investigations and results of Phase A, was published by the Electric Power Research Institute

  8. Impacts of Western Area Power Administration's power marketing alternatives on electric utility systems

    International Nuclear Information System (INIS)

    Veselka, T.D.; Portante, E.C.; Koritarov, V.

    1995-03-01

    This technical memorandum estimates the effects of alternative contractual commitments that may be initiated by the Western Area Power Administration's Salt Lake City Area Office. It also studies hydropower operational restrictions at the Salt Lake City Area Integrated Projects in combination with these alternatives. Power marketing and hydropower operational effects are estimated in support of Western's Electric Power Marketing Environmental Impact Statement (EIS). Electricity production and capacity expansion for utility systems that will be directly affected by alternatives specified in the EIS are simulated. Cost estimates are presented by utility type and for various activities such as capacity expansion, generation, long-term firm purchases and sales, fixed operation and maintenance expenses, and spot market activities. Operational changes at hydropower facilities are also investigated

  9. Advanced handbook for accident analyses of German nuclear power plants; Weiterentwicklung eines Handbuches fuer Stoerfallanalysen deutscher Kernkraftwerke

    Energy Technology Data Exchange (ETDEWEB)

    Kerner, Alexander; Broecker, Annette; Hartung, Juergen; Mayer, Gerhard; Pallas Moner, Guim

    2014-09-15

    The advanced handbook of safety analyses (HSA) comprises a comprehensive electronic collection of knowledge for the compilation and conduction of safety analyses in the area of reactor, plant and containment behaviour as well as results of existing safety analyses (performed by GRS in the past) with characteristic specifications and further background information. In addition, know-how from the analysis software development and validation process is presented and relevant rules and regulations with regard to safety demonstration are provided. The HSA comprehensively covers the topic thermo-hydraulic safety analyses (except natural hazards, man-made hazards and malicious acts) for German pressurized and boiling water reactors for power and non-power operational states. In principle, the structure of the HSA-content represents the analytical approach utilized by safety analyses and applying the knowledge from safety analyses to technical support services. On the basis of a multilevel preparation of information to the topics ''compilation of safety analyses'', ''compilation of data bases'', ''assessment of safety analyses'', ''performed safety analyses'', ''rules and regulation'' and ''ATHLET-validation'' the HSA addresses users with different background, allowing them to enter the HSA at different levels. Moreover, the HSA serves as a reference book, which is designed future-oriented, freely configurable related to the content, completely integrated into the GRS internal portal and prepared to be used by a growing user group.

  10. German offshore wind turbine farms - status and prospective

    International Nuclear Information System (INIS)

    2004-08-01

    As a consequence of Germany's forthcoming phase-out of nuclear power the German government has initiated a number of activities in order to further development of renewable energy in the future. Offshore wind power has been chosen to play a central part. Although the first wind turbine has yet to be erected in German waters there is no doubt that it is a matter of time before the growing German market will gather speed. The objective of this report is to provide Danish business enterprises with interests in wind power with an insight into the German offshore wind power market and the export possibilities of the present and in the near future. As introduction the report lists the general outlines for construction and operation of wind turbine farms in Germany, furthermore, a number of additional conditions that Danish business enterprises should be aware of are listed. The introduction is followed by an up-to-the -minute status account of all ongoing projects. This part of the report has been made on the basis of a questionnaire send out by the Danish Embassy to project leaders in the business enterprises behind the project planning. Finally, the report provides an overview of all partners behind the planned wind farms. The overview contains contact information as well as information about the composition of project companies and consortiums. (BA)

  11. SUPPLIER SELECTION CRITERIA IN A POWER UTILITY IN MALAYSIA: ENGINEERS’ PERCEPTIONS

    Directory of Open Access Journals (Sweden)

    Sivadass Thiruchelvam

    2012-06-01

    Full Text Available Supplier selection of electricity generating, transmitting and distributing systems is part of the problem-solving environment in a power utility because it is a long-term investment for the organisation. Therefore, the decision over supplier selection directly influences the operational and financial position of a power utility. In addition, the supplier selection of a power-related system is a complex multi-criteria decision problem. While some criteria may be common across different industries, there are some criteria unique to the power industry. This research aims to understand what constitutes the suitable supplier selection criteria for a power utility. This study reveals some interesting findings of how engineers perceive the importance of each criterion and suggests strongly that product quality, price and delivery are key determinants in the supplier evaluation process. The eighteen criteria considered for this study were mapped onto their respective cluster, namely: supplier’s organisational system and technology, buyer-supplier relationship and economic value. The findings of this study should assist various groups of stakeholders (e.g., suppliers, buyers and end users to gain a better understanding of social behaviour in making purchase decisions, particularly with regard to power utilities.

  12. Assessment of accident risks from german nuclear plants

    International Nuclear Information System (INIS)

    Heuser, F.W.

    1979-01-01

    The German risk study are presented. The main objectives can be summed up as follows: (a) An assessment of the societal risk due to accidents in nuclear power plants with reference to German conditions; (b) To get experience in the field of risk analysis and to provide a basis for estimation of uncertainties; (c) To provide guidance for future activities in the German Reactor Safety Research Program. Finally several conclusions reached by this study are discussed. (author)

  13. Life extension of German nuclear power plants only with the consent of the Federal Council? The importance and extent of the need for consent to an amendment to the German Atomic Energy Act

    International Nuclear Information System (INIS)

    Schneider, Horst

    2010-01-01

    In its coalition agreement of October 26, 2009, the new German federal government plans ''to extend the service life of German nuclear power plants while, at the same time, complying with the strict German and international safety standards.'' This has triggered a debate not only about (nuclear) energy, as in the past election campaign in the summer of 2009, but also about the constitutional law issue whether an amendment to the Atomic Energy Act resulting in longer operating life of nuclear power plants required the consent of the Federal Council (the ''Bundesrat,'' the second chamber of parliament). After the election to the state parliament in North Rhine-Westphalia on May 9, 2010, majority in the Federal Council changed. As a consequence, no consent to an amendment to the Atomic Energy Act must be expected. In view of the large number of recent statements about constitutional law in opinions for various federal and ministerial accounts as well as firms and associations, the outline by R. Scholz in the May issue of atw 2010 will be followed in this issue by the key points of examination of the need for consent, under aspects of constitutional law, and an attempt will be made to explain the evaluations underlying the generation of a legal concept about these items. The decision by the German Federal Constitutional Court of May 4, 2010, published on June 11, 2010, plays a major role in this respect because it established clarity in some important aspects of a legal subject matter in the field of state admini-stration on behalf of the federation, albeit in the field of air traffic law, not nuclear law. However, the structures of the norms in the German Basic Law (Art. 87c and Art. 87d, para.2) to be applied are almost identical. The energy policy and energy economy aspects of a plant life extension are considered along with the option of an appeal to the Federal Constitutional Court against any plant life extension. Finally, the key findings are summarized briefly

  14. Deregulation of the electric utility industry - implications for nuclear power

    International Nuclear Information System (INIS)

    Fern, A.R.

    2001-01-01

    The deregulation movement sweeping the international electric utility community represents a dramatic shift from the traditional utility business model. This paper will focus on deregulation in the United States and the new challenges for nuclear power plant operators. An overview of the new operating models being implemented in the US will lead into a discussion on new economic and operating concerns for nuclear power plant operators. (author)

  15. Utility-Marketer Partnerships. An Effective Strategy for Marketing Green Power?

    Energy Technology Data Exchange (ETDEWEB)

    Bird, L. A. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Brown, E. S. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2006-04-01

    This paper explores whether partnerships between utilities and independent marketers are an effective strategy for marketing green power. We present case studies of voluntary and mandatory partnerships covering green power program design and implementation in both regulated and restructured electricity markets. We also include perspectives (based on interviews) from utilities, marketers, and regulators involved in developing and implementing these partnerships. From these case studies and interviews, we describe lessons learned about developing effective partnerships, including such issues as respective roles in marketing and administration, product branding, and contract and incentive structures. Based on experience to date, strategic partnerships between utilities and marketers can be an effective approach to marketing green power. Partnerships leverage the sales and resource procurement experience of marketers and the utility’s reputation and access to customers. Further, partnerships can create greater incentives for success because marketers have a vested financial interest in maximizing customer participation and green power sales.

  16. German energy turnaround and Poland's start in nuclear power? A survey

    International Nuclear Information System (INIS)

    Knopp, Lothar; Gorski, Marek

    2015-01-01

    The book includes contributions from two meetings: 1. Meeting in Berlin, October 8,2014: Energy transition in Poland - historical background, development and actual situation; legal boundary conditions of the entry into nuclear power in Poland; ecologic and economic causes motivation for the atomic energy entry in Poland; promotion systems for renewable energy in Poland, current status and political background; construction of a nuclear power plant in Northern Poland site specific impacts and social assessment. Meeting in Stettin on November 5, 2014: Energy turnaround in Germany -German nuclear phaseout under consideration of EU legislation; ecologic and economic motivation for the energy turnaround in Germany; energy turnaround in Germany - new legal boundary conditions, especially the amendment to tue renewable energy law; contribution of the industry to the energy turnaround - taking the example waste management and waste incineration plants; fracking as a factor of the energy turnaround? - legal boundary conditions and ecologic risks; ecological, ethical and sociopolitical aspects of the energy turnaround in Germany and Poland.

  17. Disposal of spent fuel from German nuclear power plants - 16028

    International Nuclear Information System (INIS)

    Graf, Reinhold; Brammer, Klaus-Juergen; Filbert, Wolfgang; Bollingerfehr, Wilhelm

    2009-01-01

    The 'direct disposal of spent fuel' as a part of the current German reference concept was developed as an alternative to spent fuel reprocessing and vitrified HLW disposal. The technical facilities necessary for the implementation of this part of the reference concept, the so called POLLUX R concept, i.e. interim storage buildings for casks containing spent fuel, a pilot conditioning facility, and a special cask 'POLLUX' for final disposal have been built. With view to a geological salt formation all handling procedures for the direct disposal of spent fuel were tested aboveground in full-scale test facilities. To optimise the reference concept, all operational steps have been reviewed for possible improvements. The two additional concepts for the direct disposal of SF are the BSK 3 concept and the DIREGT concept. Both concepts rely on borehole emplacement technology, vertical boreholes for the BSK 3 concept und horizontal boreholes for the DIREGT concept. Supported by the EU and the German Federal Ministry of Economics and Technology (BMWi), DBE TECHNOLOGY built an aboveground full-scale test facility to simulate all relevant handling procedures for the BSK 3 disposal concept. GNS (Company for Nuclear Service), representing the German utilities, provided the main components and its know-how concerning cask design and manufacturing. The test program was concluded recently after more than 1.000 emplacement operations had been performed successfully. The BSK 3 emplacement system in total comprises an emplacement device, a borehole lock, a transport cart, a transfer cask which will shuttle between the aboveground conditioning facility and the underground repository, and the BSK 3 canister itself, designed to contain the fuel rods of three PWR-fuel assemblies with a total of about 1.6 tHM. The BSK 3 concept simplifies the operation of the repository because the handling procedures and techniques can also be applied for the disposal of reprocessing residues. In addition

  18. Wood fuels utilization in Central Europe - the wood fuels consumption and the targets of utilization

    International Nuclear Information System (INIS)

    Alakangas, E.

    1999-01-01

    Following subjects are discussed in this presentation: The share of bioenergy of the total energy consumption in EU region; the wood fuels consumption in EU region in 1995; the division of bioenergy utilization (households, wood- based district heating, wood consumption in industry, power generation from wood and residues, biofuels, biogas and sludges); wood fuels consumption in households in EU countries in 1995; wood consumption in France; the additional wood fuel consumption potential in France; Blan bois - wood energy program; French wood energy markets; German wood energy markets; energy consumption in Germany; wood consumption in Bavaria; the wood fuels potential in Bavaria; wood fuels consumption in households in Bavaria; wood fuels consumption for district heating in Bavaria; fuel prices in Bavaria; Environmental regulations in Germany; small boiler markets in Germany; Energy consumption in Austria; small-scale utilization of wood fuels; utilization of wood energy. (Slides, additional information from the author)

  19. Franco-German relationships in the energy domain

    International Nuclear Information System (INIS)

    Keppler, J.H.; Meritet, S.; Notz, K.

    2008-01-01

    After a presentation of the respective energy situation in Germany and in France, as well as the place of nuclear energy and the comparison of electric power flows, prices, power transmission and distribution in both countries, this document presents the role and priorities of the French Presidency of the European Commission in 2008 (Energy and Sustainable Development) and the actions and policies developed against climate change. The French and German positions concerning gas supply coming from Russia are discussed, together with the possibility of creation of a bi-national power and gas market with the reciprocal introduction of new actors in these markets. Finally, the role of the Franco-German couple in the organization of a European energy space is examined

  20. Technical dictionary power plant engineering. Vol. 1. 4. rev. and enlarged ed.

    International Nuclear Information System (INIS)

    1987-01-01

    This dictionary is a compilation of German and English technical terms of power plant engineering as far as power plants, turbine-generators and assembly engineering are concerned. It is the result of a joint effort by the Kraftwerk Union AG (KWU) and Utility Power Corp. (UPC). The entire content has been revised and approx. 6000 new terms have been added. The dictionary is meant to form a basis for uniform terminology on technical documents as well as correspondence between KWU, UPC and licensees. This computer aided dictionary is printed in capital/low case letters. Only nouns, terms with an article and proper names are capitalized in German. Some terms are written differently in American and British English and are marked with (US) or (GB). (orig./HP) [de

  1. 14th German nuclear law symposium

    International Nuclear Information System (INIS)

    Burgi, Martin

    2013-01-01

    Nuclear law is still relevant and topical. The nuclear power phase-out in response to the nuclear accident of Fukushima and the turnaround in German energy policy raise new legal issues. In several lectures of practioners and scientists the 14th German Nuclear Law Symposium examined questions regarding the retrofitting of nuclear power plants, their decommissioning and disposal, the current developements in the European nuclear and radiation protection law and the search for a final nuclear waste repository. The nuclear law provides examples for central challenges of administrative law, such as the independence of authorities and the protection of third parties. The discussions between the almost 150 participants are documented in several reports.

  2. Optimizing the Utility Power of a Geothermal Power Plant using Variable Frequency Drive (VFD) (Case Study: Sibayak Geothermal Power Plant)

    Science.gov (United States)

    Sinaga, R. H. M.; Manik, Y.

    2018-03-01

    Sibayak Geothermal Power Plant (SGPP) is one of the plants being developed by Pertamina Geothermal Energy (PGE) at the upstream phase. At the downstream phase, State - owned Electricity Company (PLN) through PT. Dizamatra Powerindo is the developer. The gross capacity of the power plant is 13.3 MW, consisting 1 unit of Monoblock (2 MW) developed by PGE and 2 units (2×5.65 MW) operated through Energy Sales Contract by PLN. During the development phase of a geothermal power plant, there is a chance to reduce the utility power in order to increase the overall plant efficiency. Reducing the utility power can be attempted by utilizing the wet bulb temperature fluctuation. In this study, a modeling process is developed by using Engineering Equation Solver (EES) software version 9.430. The possibility of energy saving is indicated by condenser pressure changes as a result of wet bulb temperature fluctuation. The result of this study indicates that the change of condenser pressure is about 50.8% on the constant liquid/gas (L/G) condition of the wet bulb temperature of 15°C to 25°C. Further result indicates that in this power plant, Cooling Tower Fan (CTF) is the facility that has the greatest utility load, followed by Hot Well Pump (HWP). The saving of the greatest utility load is applied trough Variable Frequency Drive (VFD) instrumentation. The result of this modeling has been validated by actual operations data (log sheet). The developed model has also been reviewed trough Specific Steam Consumption (SSC), resulting that constant L/G condition allows the optimum condition on of the wet bulb temperature of 15°C to 25°C.

  3. About Economy of Fuel at Thermal Power Stations due to Optimization of Utilization Diagram of Power-Generating Equipment

    Directory of Open Access Journals (Sweden)

    M. V. Svechko

    2008-01-01

    Full Text Available Problems of rational fuel utilization becomes more and more significant especially for thermal power stations (TPS. Thermal power stations have complicated starting-up diagrams and utilization modes of their technological equipment. Method of diagram optimization of TPS equipment utilization modes has been developed. The method is based on computer analytical model with application of spline-approximation of power equipment characteristics. The method allows to economize fuel consumption at a rate of 15-20 % with accuracy of the predicted calculation not more than 0.25 %.

  4. Utilization of Mental Health Care, Treatment Patterns, and Course of Psychosocial Functioning in Northern German Coronary Artery Disease Patients with Depressive and/or Anxiety Disorders.

    Science.gov (United States)

    Westermair, Anna Lisa; Schaich, Anja; Willenborg, Bastian; Willenborg, Christina; Nitsche, Stefan; Schunkert, Heribert; Erdmann, Jeanette; Schweiger, Ulrich

    2018-01-01

    Comorbid mental disorders in patients with coronary artery disease (CAD) are common and associated with adverse somatic outcomes. However, data on utilization rates of mental health care and treatment efficiency are scarce and inconsistent, which we tried to remedy with the present preliminary study on Northern German CAD patients. A total of 514 German CAD patients, as diagnosed by cardiac catheterization, were assessed using the Mini International Neuropsychiatric Interview and the Global Assessment of Functioning (GAF) scale. Global utilization of mental health care since onset of CAD was 21.0%. Depressive disorders, younger age, and lower GAF at onset of CAD were associated with higher utilization rates, while anxiety disorders and gender were not. Lower GAF at onset of CAD, female gender, and psychotherapy was positively associated with higher gains in GAF, while younger age and anxiety disorders were negatively associated. The majority of CAD patients with comorbid depression reported to have received mental health treatment and seemed to have benefited from it. However, we found preliminary evidence of insufficiencies in the diagnosis and treatment of anxiety disorders in CAD patients. Further studies, preferably prospective and with representative samples, are needed to corroborate or falsify these findings and explore possible further mediators of health-care utilization by CAD patients such as race, ethnicity, and socioeconomic status.

  5. Deregulation of the electric utility industry - implications for nuclear power

    International Nuclear Information System (INIS)

    Fern, A.Rose

    2000-01-01

    The deregulation movement sweeping the international electric utility community represents a dramatic shift om the traditional business model of utilities. This paper will focus on deregulation in thc United States and the new challenges for nuclear power plant operators. An overview of the new operating models being implemented in the US will lead into a discussion on new economic and operating concerns for nuclear power plant operators. (author)

  6. Design and approval of EPS diesel systems in German NPP

    Energy Technology Data Exchange (ETDEWEB)

    Kollmer, A.A., E-mail: anton.kollmer@tuev-sued.de [TUV SUD Industrie Service GmbH, Munich (Germany)

    2014-07-01

    Not at least because of 'Fukushima accident', Emergency power supply (EPS) systems with diesel engines are regarded as higher safety-important as 20 years ago. This presentation shows the design and approval of the emergency power facilities of the German nuclear power plants. It deals with the essential details e. g.: EPS Diesel integration to main power grid of the German BWR and PWR; Procedure for 'Loss of off-site power (LOOP)-Design'; Design robustness of AC Power Supply (Design requirements: independent redundancies, airplane crash, explosion pressure wave, earth-quake); Cooling systems (chilled by river water, air, well water, stored water volume); Layout of the stationary emergency Diesel generator (fuel supply, starting system); Layout of the bunkered EDG with directly driven emergency feed water pump; Robustness of AC power supply beyond design; Layout of mobile chilling equipment for diesel engines; Layout of mobile Diesel gen-sets (200 kVA and 1250 kVA); German Requirements of KTA 3702 versus US-IEE 323; Construction, Materials and Testing of EDG; Maintenance (in-service inspections, operation, Repair); Lessons learned (e. g. crank house cracks, start failure due to too much oil in the combustion chamber) (author)

  7. Franco-German nuclear cooperation: from the 'common product' to the first European pressurized water reactor

    International Nuclear Information System (INIS)

    Vignon, D.

    1999-01-01

    It has now been 10 years since Framatome and Siemens decided to collaborate on the design and sales of an advanced nuclear power plant (NPP) model based on pressurized water reactor (PWR) technology. Originally called the 'common product', this model was renamed the European pressurized water reactor when Electricite de France (EDF) and the German electric utilities joined this cooperative development effort in 1992. Since the beginning, this cooperation has been formalized in the framework of an agreement that led to the founding of a joint and equally owned subsidiary, Nucler Power International (NPI), which is reponsible for leading the development of the new model and later handling its export sales

  8. Annual report 1993 of the German Atomic Forum

    International Nuclear Information System (INIS)

    Petroll, M.

    1994-01-01

    In retrospect it is stated that in 1993 the hopes of an energy policy consensus between the political parties have not come true; the operation of existing plants continues to be politically endangered, and the future of nuclear energy continues to be unclear. Particularly depressing is the large number of nuclear installations whose fate is undecided. To save German industry from serious harm, an energy policy consensus has to be found which the German Atomic Forum seeks to bring about. An account is given of organized events and working groups, of international cooperation and cooperation with other organizations. In 1993 German nuclear power plants generated more than 153,5 thousand million kilowatt-hours, thus contributing, as the year before, more than one third (34%) to power supply. In Western Germany this percentage even amounted to almost 40%. The use of nuclear energy made it possible in 1993 to avoid release of more than 150 million tons of carbon dioxide, that is about 15% of German overall emissions. (orig./HSCH) [de

  9. 1984 availability of the world's nuclear power plants

    International Nuclear Information System (INIS)

    Szeless, A.; Oszuszky, F.

    1985-01-01

    This survey of the availability of the world's nuclear power plants in 1984 coveres 250 units (the CMEA countries excluded) with an aggregate 184,500 MWe, which are arranged by types of reactor and geographic distribution. The utilization of nuclear power plant capacity attained an average of 66% in 1984, which is an increase by 3 percentage points in the utilization of capacity over the previous year's level (63%). Capacity utilization in pressurized water reactors 1984 (69%) was 4 percentage points higher than it was in boiling water reactors (65%). The ranking list of the world's nuclear power plants is headed by one heavy water reactor and one gas cooled reactor each (98%), followed by five generating units, i.e., two pressurized water reactors, two boiling water reactors, and one heavy water reactor (all 95%). The best German nuclear power plants were Grafenrheinfeld (89%, position No. 20) and Unterweser and Stade (88%, position No. 25). (orig.) [de

  10. West German nuclear politics: a study of international cooperative behavior

    International Nuclear Information System (INIS)

    Driscoll, R.F.

    1983-01-01

    This dissertation is an investigation of the motivations behind West German policies and behavior in the area of nuclear politics. It examines and attempts to explain this behavior using a taxonomy built around the factors of vulnerability, power, domestic support, and autonomy. These are called international cooperative behavior factors. Chapters I and II develop the taxonomy and define the factors in terms of the Federal Republic. Chapter III covers the period up through the functioning of the Nuclear Planning Group, while Chapter IV analyzes NATO's December 1979 modernization decision. The presentation is less chronological and more selective: it focuses on the four international cooperative behavior factors as explanatory concepts. Chapter V examines the utility of the taxonomy. It concludes that the factors of autonomy, domestic support and vulnerability appear to be key in understanding and predicting West German nuclear behavior. The chapter then studies the potential applicability of the taxonomy to other nations or issues. It concludes that the factors are very nation-specific, but they do in fact provide a useful classification and explanatory scheme

  11. Control rooms in German nuclear power plants

    International Nuclear Information System (INIS)

    Hoffmann, E.

    1999-01-01

    The paper explains and illustrates the dissimilarity in design and equipment of control rooms in German NPPs, as well as a historical survey of the general principles and approaches applied in the evolution of control room technology, including backfitting activities. Experience obtained from daily operation as well training at the simulators is taken as a basis to formulate fundamental requirements for modification or novel design approaches. (orig./CB) [de

  12. THE PLIGHT OF GERMAN MISSIONS IN MANDATE CAMEROON: AN HISTORICAL ANALYSIS

    Directory of Open Access Journals (Sweden)

    Lang Michael Kpughe

    2017-09-01

    Full Text Available The First World War and its resultant Mandate and Trusteeship systems greatly affected the German mission enterprise in Cameroon. Apart from causing the forceful ousting of German missionaries from Cameroon, the British and the French whom the League of Nations and United Nations successively chose as administering powers within the Mandate and Trusteeship frameworks adopted hostile policies towards German missions. From the beginning of the war to the post-Second World War era, the foundation of German missions was seriously threatened. This paper critically examines the treatment of German missions in both British and French Cameroons during the Mandate and Trusteeship periods, focusing especially on the opposing attitudes of both administering powers towards the missions in their spheres of influence. The paper establishes that the administering powers’ treatment of German missions, which was underpinned by imperial and nationalist exigencies, roiled the attainment of the triple missionization agenda of planting self-supporting, self-governing and self-evangelizing churches. It thus argues that the First World War triggered the mistreatment of German missions, with some missions forced to terminate their activities while others were allowed to continue their mission work under difficult conditions.

  13. Utilities get more involved in Inpo [Institute of Nuclear Power Operations

    International Nuclear Information System (INIS)

    Varley, J.

    1984-01-01

    The Institute of Nuclear Power Operations (INPO) was established four years ago in a bid to foster self improvement and self regulation among the American nuclear power utilities. A significant increase in utility commitment and involvement in many of its programmes appears to have made 1983 a very good year for INPO. (U.K.)

  14. Case studies on the feasibility of the transient analysis system STAR in German nuclear power plants

    International Nuclear Information System (INIS)

    Buettner, W.E.; Felkel, L.; Zapp, A.

    1984-01-01

    On the basis of distubances which actually have occurred in German nuclear power plants a case-study has been performed to evaluate the feasibility of the computer-based disturbance analysis system STAR. By means of a compact plant simulator the disturbances collected have been remodelled and anlysed, on-line, with the disturbance analysis system STAR. In the last phase of the project experiments have been performed with reactor operators to get their reaction to, and opinion on, computerbased-operator aids. (orig.) [de

  15. Analysis and evaluation for social acceptability for utilizing nuclear power in China

    International Nuclear Information System (INIS)

    Xu, Ting; Wakabayashi, Toshio

    2011-01-01

    This study is about the acceptability of the society of utilizing nuclear power in China. There are different interactions and opinions has been raised that leads conflict between the society and the nuclear technology people. Many emotions and views have mixed up: people have image of environment friendly, also have image of explosion, fright and danger. The purpose of this study is to make clear the social consciousness for utilizing nuclear power in China and to improve social acceptability. A survey by the questionnaire was conducted for investigation of the features of the social consciousness for necessity and safety for utilizing nuclear power in China. The questionnaire has been sent to 10000 citizens of Zhejiang province in south China from June to August 2010 (Zhejiang province is one of the earliest city for utilizing nuclear power plants in China). There were 4255 available respondents (42.6%) with 1851 men and 2404 women of adult who answered the questionnaire. The survey was including 37 items about energy problem, social consciousness for utilizing nuclear power, safety, the reliability of government and information sources. As a result, it was found that some 57.5% of adults are in favor of nuclear power plants. There are differences of sense between men and women. The reliability for safety of men for nuclear power is higher than that of women. Some 59.6% of men respondents are in favor of nuclear power plants, and about 10% respondents of women are in favor of nuclear power plants. Social acceptance is still one of the major barriers for further development of nuclear power, although recent technological and institutional innovation is clearly reduced its risk and enhanced its relative and absolute benefit compared to other energy resources. Consequently, this result indicates that women with maternal instinct may not be favor of nuclear power plants compared with men in China. (author)

  16. Utilization of artificial intelligence techniques for the Space Station power system

    Science.gov (United States)

    Evatt, Thomas C.; Gholdston, Edward W.

    1988-01-01

    Due to the complexity of the Space Station Electrical Power System (EPS) as currently envisioned, artificial intelligence/expert system techniques are being investigated to automate operations, maintenance, and diagnostic functions. A study was conducted to investigate this technology as it applies to failure detection, isolation, and reconfiguration (FDIR) and health monitoring of power system components and of the total system. Control system utilization of expert systems for load scheduling and shedding operations was also researched. A discussion of the utilization of artificial intelligence/expert systems for Initial Operating Capability (IOC) for the Space Station effort is presented along with future plans at Rocketdyne for the utilization of this technology for enhanced Space Station power capability.

  17. Conferring of contracts by utilities in the Single European Market. Transposition of the sectoral directive where it concerns construction and delivery orders into German law

    International Nuclear Information System (INIS)

    Pick, H.; Wetzel, U.

    1994-01-01

    After the enactment of the Second Law Amending the Law on Budgetary Principles, the Ordinance on the Confering of Contracts, and the Ordinance on Verification; and the amendment of the ordinances on the placing of construction and delivery orders (VOB and VOL) the European Directives on so-called ''public'' tendering can be said to be transposed into German law as far as they concern construction and delivery orders. This means that as of 1 March 1994 besides the ''classical'' public contractors utilities, too, must invite bids Europe-wide. According to European law this also applies to service orders as of 1 July 1994, but this provision still awaits transposition into German law. (orig.) [de

  18. DEWEK '98: 4. German wind power conference; DEWEK '98: 4. Deutsche Windenergie-Konferenz. Tagungsband

    Energy Technology Data Exchange (ETDEWEB)

    Gerdes, B [ed.

    1999-07-01

    The conference report comprises 90 papers and posters on the following subjects: 1. Technological developments (e.g. use of adaptive structures systems, active stalle wind power systems, systems for early detection of errors); 2. Design and optimisation; 3. Wind forecasts; 4. Operation analyses (e.g. active and passive stall, collective loads, wind power systems in cold climates); 5. Wind power systems and the environment; 6. Offshore wind power generation; 7. Electric characteristics (e.g. modelling of flicker, energy conditioning in distribution systems with a high wind power share); 8. Economic efficiency (e.g. economic efficiency of offshore wind parks on the North Sea coast); 9. Network quality; 10. Rotor development (e.g. noise reduction); 11. Certification and methods of measurement. [German] Der Tagungsband enhaelt 90 Fach- und Posterbeitraege, die sich mit den folgenden Schwerpunkten befassen: 1. Technologische Entwicklungen (z.B. Einsatz von adaptiven Struktursystemen; Active-Stall-WKA; Fehlerfrueherkennungssystemen). 2. Auslegung und Optimierung. 3. Windprognosen. 4. Betriebsanalysen (z.B. Aktive Stall/Passive Stall im Vergleich; Lastkollektive von WKA; WKA in kaltem Klima). 5. Windenergieanlagen und Umwelt. 6. Offshore-Windenergienutzung. 7. Elektrische Eigenschaften (z.B. Modellierung des 'Flickerverhaltens' von WKA; Energiekonditionierung in Verteilnetzen mit hohem Windenergieanteil). 8. Wirtschaftlichkeit (z.B. Wirtschaftlichkeit von Offshore-Windparks der Norddeutschen Kuestenlinie). 9. Netzqualitaet. 10. Rotorentwicklung (z.B. Reduzierung der Schallabstrahlung von WKAs). 11. Zertifizierung von Messmethoden. (AKF)

  19. German energy market 2014; Deutscher Energiemarkt 2014

    Energy Technology Data Exchange (ETDEWEB)

    Schiffer, Hans-Wilhelm [World Energy Council, London (United Kingdom). World Energy Resources; Weltenergierat - Deutschland, Berlin (Germany). Arbeitsgruppe ' Energie fuer Deutschland'

    2015-03-15

    In 2014 the German government's primary goal of engaging German power suppliers to step up their production of renewable energy while speeding up energy efficiency improvement measures continued to dominate the debate. The present article provides an updated overview of the German energy market. Following on from last year's edition it gives a condensed synopsis of key indicators of the energy economy. Besides summarising general facts about the energy mix it goes into detail about the following individual energy resources: crude oil, natural gas, brown coal, hard coal, nuclear energy and renewable energies. It also explains current price trends in both the international and domestic markets.

  20. 9 %-chromium steel P91 and P92 in German power plants. From 1991 to the present day

    Energy Technology Data Exchange (ETDEWEB)

    Bader, Mirko; Thuemer, Joerg Rainer; Glasenapp, Klaus [E.ON Anlagenservice GmbH, Gelsenkirchen (Germany)

    2013-09-01

    P91 and P92 are the top players in the field of high-pressure piping in modern coal-fired and CCGT power plants. A long-term testing phase and a step-by-step introductory phase since the nineties had preceded current application. For this reason, a review and overview of the first installation in German power plants and the experience acquired from almost 20 years' operating time of USC boilers in medium-load operation mode will be presented. With a view to the newly built power plants, the focal point changes to P92 for high-temperature pressure tubing. In this context the technical experiences were used in the material qualification process and the design of new component. (orig.)

  1. Utility-cogenerator game for pricing power sales and wheeling fees

    International Nuclear Information System (INIS)

    Kuwahata, Akeo; Asano, Hiroshi

    1994-01-01

    The authors studied an extensive game model of an electricity market where a cogenerator sells excess electricity to an electric utility or to an end user. They found that a buy-back system (the utility purchases cogenerated power) is as efficient as a cogenerator-customer wheeling system and that these two systems are more desirable than a monopoly system for the regulator. The buy-back rate should be equal to (LP bargaining solution) or less than (Nash bargaining solution) the marginal cost of the electric utility. They also conducted an analysis of a two-period electricity market in which they found that the cogenerator that can supply excess power during peak period obtains the market advantage

  2. A plant-level analysis of the spill-over effects of the German Energiewende

    International Nuclear Information System (INIS)

    Mulder, Machiel; Scholtens, Bert

    2016-01-01

    Highlights: • We estimate the effects of German renewable energy on the Dutch power market. • Using hourly plant-level data, we estimate effects on prices, dispatch and fuel efficiency. • The price elasticity of German wind on Dutch prices is −0.04. • The spill-over effects are restricted by constraints on cross-border capacity. • The dramatic performance of the Dutch plants is mainly related to relative fuel prices. - Abstract: In order to analyse international effects of national energy policies, we investigate the spill-over effects of the German Energiewende on the Dutch power market, which is closely connected to the German market. We estimate the impact of the German supply of wind and solar electricity on the Dutch day-ahead price of electricity and the utilisation of the conventional power plants. We take cross-border capacity constraints into account and use hourly plant-level data over 2006–2014. We find that the price elasticity of German wind on Dutch day-ahead prices is −0.03. However, this effect vanishes when the cross-border capacity is fully utilised. We find a modest negative impact on the utilisation of the Dutch power plants. As such, we conclude that the German Energiewende has had modest spill-over effects to the Dutch market. The recent dramatic performance of the Dutch gas-fired plants can be attributed to the changes in the relative prices of coal versus natural gas. We conclude that national energy policies in one country do not necessarily strongly affect neighbouring markets in case of constrained cross-border capacities.

  3. Procedures and applications to enlarge the level 1+ PSA to internal fires in German nuclear power plants

    International Nuclear Information System (INIS)

    Berg, H.P.; Breiling, G.; Hoffmann, H.H.

    1997-01-01

    Investigations have shown that the consequences from fires in nuclear power plants can be significant. Methodologies considering fire in probabilistic safety analyses have been evolving in the last few years. In order to provide a basis for further discussions on benefits and limits of such an analysis in Germany, current methods are investigated. As a result a qualitative screening process is proposed to identify critical fire zones followed by a quantitative event tree analysis in which the fire caused frequency of initiating events and different core damage states will be determined. The models and data proposed for a probabilistic fire risk analysis have been successfully applied in complete and partial fire risk assessments in German nuclear power plants

  4. Renewables in the grid. Modeling the German power market of the year 2030

    International Nuclear Information System (INIS)

    Boldt, Jenny; Hankel, Lisa; Laurisch, Lilian Charlotte; Lutterbeck, Felix; Oei, Pao-Yu; Sander, Aram; Schroeder, Andreas; Schweter, Helena; Sommer, Philipp; Sulerz, Jasmin

    2012-01-01

    Renewable energy in Germany is on the rise. Recent changes in legislature, following the nuclear disaster in Fukushima, have accelerated the shift towards a renewable and sustainable energy supply. Offshore wind from the North and Baltic Sea is expected to reach nearly 30 GW by 2030, while the adequacy of the electricity grid to withstand this impact is already threatened today. Since the bulk of renewable energy comes from the North and East of Germany, while demand is far greater in the South and West, transmission infrastructure is poised to become the bottleneck of the German power market transformation. This study investigates where congestion is likely to occur along the grid, and proposes different approaches to meeting the requirements of an increasing share of renewable energy generation. A considerable amount of data for the year 2030, including, but not limited to, conventional generation, renewable generation, transmission and demand serves as the input for the welfare-maximizing DC load flow model. It consists of 40 nodes (18 within Germany, as well as 22 European countries, each modeled by a single node), 232 AC lines and 35 DC lines. The model is solved with the General Algebraic Modeling System (GAMS) for four representative weeks in 2030, one for each season of the year. We investigate three different scenarios: the Reference Scenario, the Strategic South Scenario and the Direct Current (DC) Highway Scenario. - The Reference Scenario is based on the assumption that 63 percent of renewable energy power will be generated in Northern and Eastern Germany by 2030, while 62 percent of load will be located in Southern and Western Germany. This situation requires a substantial expansion of transmission infrastructure from north to south. - In the Strategic South Scenario, we explore the possibility of strategically placing renewable and conventional generation capacities to Southern and Western regions in order to make major transmission upgrades redundant

  5. Renewables in the grid. Modeling the German power market of the year 2030

    Energy Technology Data Exchange (ETDEWEB)

    Boldt, Jenny; Hankel, Lisa; Laurisch, Lilian Charlotte; Lutterbeck, Felix; Oei, Pao-Yu; Sander, Aram; Schroeder, Andreas; Schweter, Helena; Sommer, Philipp; Sulerz, Jasmin

    2012-02-15

    Renewable energy in Germany is on the rise. Recent changes in legislature, following the nuclear disaster in Fukushima, have accelerated the shift towards a renewable and sustainable energy supply. Offshore wind from the North and Baltic Sea is expected to reach nearly 30 GW by 2030, while the adequacy of the electricity grid to withstand this impact is already threatened today. Since the bulk of renewable energy comes from the North and East of Germany, while demand is far greater in the South and West, transmission infrastructure is poised to become the bottleneck of the German power market transformation. This study investigates where congestion is likely to occur along the grid, and proposes different approaches to meeting the requirements of an increasing share of renewable energy generation. A considerable amount of data for the year 2030, including, but not limited to, conventional generation, renewable generation, transmission and demand serves as the input for the welfare-maximizing DC load flow model. It consists of 40 nodes (18 within Germany, as well as 22 European countries, each modeled by a single node), 232 AC lines and 35 DC lines. The model is solved with the General Algebraic Modeling System (GAMS) for four representative weeks in 2030, one for each season of the year. We investigate three different scenarios: the Reference Scenario, the Strategic South Scenario and the Direct Current (DC) Highway Scenario. - The Reference Scenario is based on the assumption that 63 percent of renewable energy power will be generated in Northern and Eastern Germany by 2030, while 62 percent of load will be located in Southern and Western Germany. This situation requires a substantial expansion of transmission infrastructure from north to south. - In the Strategic South Scenario, we explore the possibility of strategically placing renewable and conventional generation capacities to Southern and Western regions in order to make major transmission upgrades redundant

  6. Multicultural Education: Israeli and German Adolescents' Knowledge and Views Regarding the Holocaust

    Science.gov (United States)

    Shamai, Shmuel; Yardeni, Eran; Klages, Benjamin

    2004-01-01

    This study probes a unique case of multicultural education of Israeli and German students regarding the Holocaust. Their knowledge level of German history leading to the rise of Hitler and the Nazi party to power, knowledge about the Holocaust, the relation between their knowledge of attitudes toward the "other" (German/Israeli) group, and their…

  7. Test report light duty utility arm power distribution system (PDS)

    International Nuclear Information System (INIS)

    Clark, D.A.

    1996-01-01

    The Light Duty Utility Arm (LDUA) Power Distribution System has completed vendor and post-delivery acceptance testing. The Power Distribution System has been found to be acceptable and is now ready for integration with the overall LDUA system

  8. The new German radiation protection ordinance

    International Nuclear Information System (INIS)

    Pfeffer, W.; Weimer, G.

    2003-01-01

    According to European law, the Basic Safety Standards (BSS) published by the European Council in 1996 and the Council Directive on health protection of individuals against dangers of ionising radiation in relation to medical exposure had to be transferred into national law within due time. In 2001 the new Ordinance for the Implementation of the Euratom Guidelines on Radiation Protection] was published, which replaces the old Radiation Protection Ordinance. The new German Ordinance adapts the European Directive to German law, covering the general principles but even giving more details in many fields of radiation protection. The BSS scope certainly is much broader than the prescriptions important for the field of radiation protection in nuclear power plants. According to the scope of this workshop on occupational exposure in nuclear power plants - and as the BSS most probably will be quite familiar to all of you - after a short general overview on relevant contents of the German Ordinance, this presentation will focus on the main issues important in the operation of NPP and especially on some areas which may give rise to necessary changes caused by the new Ordinance. (A.L.B.)

  9. German energy policy in deregulated Europe; Deutsche Energiepolitik im liberalisierten Europa

    Energy Technology Data Exchange (ETDEWEB)

    Kuhnt, D. [RWE Energie AG, Essen (Germany)

    2000-07-01

    The author argues in favor of a more fact-oriented German energy policy: Firstly, German energy policy must accept the new European framework of a market economy. This means that German utilities must no longer be burdened with the implementation of political objectives. The German power industry needs a level playing field for competition on a European scale. Consequently, also the European partner countries should not limit themselves to the minimum conditions of the Single Market Directive in opening their markets. Secondly, German energy policy must develop new forms of cooperation with the power industry so as to maintain domestic employment and the addition of value despite considerably stronger competitive pressure. Also the conflicting targets of sustainability, continuity of supply, and economic viability must not only be discussed, but must be turned into productive approaches. Thirdly, this means that there must be no inadmissible solution in matters nuclear. If the German power industry is to remain strong, in the interest of domestic jobs and opportunities for the future, it must not lose any more domestic market share to other European companies. Fourthly, we need a new energy policy which takes cognizance of the results of market development in a more rational, less emotional way. In this respect, it should be limited henceforth to supporting renewable energies and technologies so as to enhance energy efficiency in line with market requirements. Fifthly, German energy policy must not commit the mistake of enforcing deregulation and, at the same time, exempting large segments of the market from competition. Thus, the planned expansion of renewable energies, and the increase in cogeneration to more than thirty percent of the German electricty generation, by way of quotas and revenues for electricity from these sources fed into the public grid, are incompatible with competition in Europe. The electricity tax within the framework of the eco tax, the

  10. A plant-level analysis of the spill-over effects of the German Energiewende

    NARCIS (Netherlands)

    Mulder, Machiel; Scholtens, Bert

    2016-01-01

    In order to analyse international effects of national energy policies, we investigate the spill-over effects of the German Energiewende on the Dutch power market, which is closely connected to the German market. We estimate the impact of the German supply of wind and solar electricity on the Dutch

  11. Childhood cancer in the surroundings of German nuclear power plants: report of an ongoing epidemiological study

    International Nuclear Information System (INIS)

    Schulze-Rath, R.; Kaatsch, P.; Schmiedel, S.; Spix, C.; Blettner, M.

    2006-01-01

    Epidemiological studies could not show an association between ionising radiation of nuclear power stations in routine operation and the incidence of childhood cancer, yet. The following report presents a case control study conducted by the German Childhood Cancer Registry since autumn 2003. All children in the study region, who were diagnosed with cancer between 1980 and 2003 at an age below five are included. In the first part of the study we investigate whether children with cancer (cases) lived closer to the respective nuclear power stations compared to random children without cancer (controls). In the second part, for a subgroup of cases and controls we conduct computer assisted telephone interviews regarding confounders possibly associated with the exposure of ionising radiation and childhood cancer. Results are expected by the end of 2006. (orig.)

  12. Evaluation of the Geothermal Public Power Utility Workshops in California

    Energy Technology Data Exchange (ETDEWEB)

    Farhar, B. C.

    2004-10-01

    The federal government devotes significant resources to educating consumers and businesses about geothermal energy. Yet little evidence exists for defining the kinds of information needed by the various audiences with specialized needs. This paper presents the results of an evaluation of the Geothermal Municipal Utility Workshops that presented information on geothermal energy to utility resource planners at customer-owned utilities in California. The workshops were sponsored by the Western Area Power Administration and the U.S. Department of Energy's GeoPowering the West Program and were intended to qualitatively assess the information needs of municipal utilities relative to geothermal energy and get feedback for future workshops. The utility workshop participants found the geothermal workshops to be useful and effective for their purposes. An important insight from the workshops is that utilities need considerable lead-time to plan a geothermal project. They need to know whether it is better to own a project or to purchase geothermal electricity from another nonutility owner. California customer-owned utilities say they do not need to generate more electricity to meet demand, but they do need to provide more electricity from renewable resources to meet the requirements of the state's Renewable Portfolio Standard.

  13. Suggestions for an adequate risk communication - experiences based on German epidemiological studies on childhood cancer and neighbourhood to nuclear power plants

    International Nuclear Information System (INIS)

    Kaatsch, P.

    2006-01-01

    From the example of the German studies on childhood cancer in the vicinity of nuclear power plants general principles for adequate risk communication could be derived. It is particularly important to explain the complexity of the issue to the public in an adequate way, when dealing with topics of such an emotionally loaded nature. Some rules are required, when explaining the nature of risk to the layman, the press, politicians, or scientists from other fields. The main principle is to create a basis of trustfulness, whereupon results can be presented. In this contribution we derive general and proven specific recommendations for adequate risk communication on the basis of experiences made at the German Childhood Cancer Registry. (orig.)

  14. Survey of thorium utilization in power reactor systems

    International Nuclear Information System (INIS)

    Schwartz, M.H.; Schleifer, P.; Dahlberg, R.C.

    1976-01-01

    It is clear that thorium-fueled thermal power reactor systems based on current technology can play a vital role in serving present and long-term energy needs. Advanced thorium converters and thermal breeders can provide an expanded resource base from which the world's growing energy demands can be met. Utilization of a symbiotic system of fast breeders and thorium-fueled thermal reactors can be particularly effective in providing low cost power while conserving uranium resources. Breeder reactors are characterized by high capital costs and very low fuel costs since they produce more fuel than they consume. This excess fuel can be used to fuel thermal converter reactors whose capital costs are low. This symbiosis is optimized when 233 U is bred in the fast breeders and then used to fuel high-conversion-ratio thermal converter reactors operating on the thorium-uranium fuel cycle. The thorium-cycle HTGR, after undergoing more than fifteen years of development in both the United States and Europe, provides for the optimum utilization of our limited uranium resources. Other thermal reactor systems, previously operating on the uranium cycle, also show potential in their capability to utilize the thorium cycle effectively

  15. Basic plan for nuclear power development and utilization in 1987

    International Nuclear Information System (INIS)

    1987-01-01

    This report presents specific measures to be carried out in 1987 to promote research, development and application of nuclear power. The first part deals with the strengthening of safety measures, centering on the improvement in regulation and administration for nuclear power safety; promotion of safety studies; improvement and strengthening of disaster prevention measures; improvement and strengthening of environmental activity surveys; improvement in exposure control measures for nuclear power operation workers; and establishment of the nuclear fuel cycle and safety in such activities as development of new reactors. The second part of the report addresses the promotion of nuclear power generation. Measures for this will be focused on the promotion of location of nuclear power plants and the development of advanced technology for light water reactors. The third part describes measures for establishing the nuclear fuel cycle, which cover the procurement of uranium resources; enrichment of uranium; reprocessing of spent fuel and utilization of plutonium and recovered uranium; and disposal of radioactive waste. Other parts presents measures to be carried out for the development of new power reactors; research on nuclear fusion; development of nuclear powered vessels; application of radiations; improvement in the infrastructure for nuclear power development and utilization; etc. (Nogami, K.)

  16. Financial impacts of nonutility power purchases on investor-owned electric utilities

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    To assist in its these responsibilities in the area of electric power, EIA has prepared this report, Financial Impacts of Nonutility Power Purchases on Investor-Owned Electric Utilities. The primary purpose of this report is to provide an overview of the issues surrounding the financial impacts of nonutility generation contracts (since the passage of the Public Utility Regulatory Policies Act of 1978) on investor-owned utilities. The existing concern in this area is manifest in the provisions of Section 712 of the Energy Policy Act of 1992, which required State regulatory commissions to evaluate various aspects of long-term power purchase contracts, including their impact on investor-owned utilities` cost of capital and rates charged to customers. The EIA does not take positions on policy questions. The EIA`s responsibility is to provide timely, high quality information and to perform objective, credible analyses in support of the deliberations by both public and private decision-makers. Accordingly, this report does not purport to represent the policy positions of the US Department of Energy or the Administration.

  17. Financial impacts of nonutility power purchases on investor-owned electric utilities

    International Nuclear Information System (INIS)

    1994-01-01

    To assist in its these responsibilities in the area of electric power, EIA has prepared this report, Financial Impacts of Nonutility Power Purchases on Investor-Owned Electric Utilities. The primary purpose of this report is to provide an overview of the issues surrounding the financial impacts of nonutility generation contracts (since the passage of the Public Utility Regulatory Policies Act of 1978) on investor-owned utilities. The existing concern in this area is manifest in the provisions of Section 712 of the Energy Policy Act of 1992, which required State regulatory commissions to evaluate various aspects of long-term power purchase contracts, including their impact on investor-owned utilities' cost of capital and rates charged to customers. The EIA does not take positions on policy questions. The EIA's responsibility is to provide timely, high quality information and to perform objective, credible analyses in support of the deliberations by both public and private decision-makers. Accordingly, this report does not purport to represent the policy positions of the US Department of Energy or the Administration

  18. Study of factors governing US utility nuclear power decisions

    International Nuclear Information System (INIS)

    1980-05-01

    Under DOE contract No. DE-AC02-79ET34009, The S.M. Stoller Corporation has conducted a study of US utility attitudes toward nuclear power. In the course of this study SMSC carried out a utility survey the objectives of which were: (1) to identify and rank in importance the governing considerations in actions taken in the past three years to cancel or defer nuclear projects, and (2) to gain insight into the circumstances and attitudes likely to govern new base-load commitments over the next several years. During the survey, contacts were made at the senior management level with utilities representing approximately half of the country's total electric capacity and two-thirds of its present nuclear commitment. Analysis of the responses led to the conclusion that most, if not all, of the decisions reached by the respondent utilities in the past several years to cancel or defer nuclear projects were triggered by one or a combination of the following four considerations: financial constraints; reduction in expected system load growth; schedule delay in licensing and construction and/or unpredictability; and adverse state government policies or attitudes regarding nuclear power

  19. NPPCI - topics in the German Democratic Republic

    International Nuclear Information System (INIS)

    Ziegenbein, D.

    1986-01-01

    This paper summarizes research and development activities in the field of computerized operator support systems, self-powered detectors, boiling diagnostic and loose part detection systems in the German Democratic Republic

  20. Remerschen nuclear power station with BBR pressurized water reactor

    International Nuclear Information System (INIS)

    Hoffmann, J.P.

    1975-01-01

    On the basis of many decades of successful cooperation in the electricity supply sector with the German RWE utility, the Grand Duchy of Luxemburg and RWE jointly founded Societe Luxembourgeoise d'Energie Nucleaire S.A. (SENU) in 1974 in which each of the partners holds a fifty percent interest. SENU is responsible for planning, building and operating this nuclear power station. Following an international invitation for bids on the delivery and turnkey construction of a nuclear power station, the consortium of the German companies of Brown, Boveri and Cie. AG (BBC), Babcock - Brown Boveri Reaktor GmbH (BBR) and Hochtief AG (HT) received a letter of intent for the purchase of a 1,300 MW nuclear power station equipped with a pressurized water reactor. The 1,300 MW station of Remerschen will be largely identical with the Muelheim-Kaerlich plant under construction by the same consortium near Coblence on the River Rhine since early 1975. According to present scheduling, the Remerschen nuclear power station could start operation in 1981. (orig.) [de

  1. Factor Structure, Reliability and Measurement Invariance of the Alberta Context Tool and the Conceptual Research Utilization Scale, for German Residential Long Term Care

    Science.gov (United States)

    Hoben, Matthias; Estabrooks, Carole A.; Squires, Janet E.; Behrens, Johann

    2016-01-01

    We translated the Canadian residential long term care versions of the Alberta Context Tool (ACT) and the Conceptual Research Utilization (CRU) Scale into German, to study the association between organizational context factors and research utilization in German nursing homes. The rigorous translation process was based on best practice guidelines for tool translation, and we previously published methods and results of this process in two papers. Both instruments are self-report questionnaires used with care providers working in nursing homes. The aim of this study was to assess the factor structure, reliability, and measurement invariance (MI) between care provider groups responding to these instruments. In a stratified random sample of 38 nursing homes in one German region (Metropolregion Rhein-Neckar), we collected questionnaires from 273 care aides, 196 regulated nurses, 152 allied health providers, 6 quality improvement specialists, 129 clinical leaders, and 65 nursing students. The factor structure was assessed using confirmatory factor models. The first model included all 10 ACT concepts. We also decided a priori to run two separate models for the scale-based and the count-based ACT concepts as suggested by the instrument developers. The fourth model included the five CRU Scale items. Reliability scores were calculated based on the parameters of the best-fitting factor models. Multiple-group confirmatory factor models were used to assess MI between provider groups. Rather than the hypothesized ten-factor structure of the ACT, confirmatory factor models suggested 13 factors. The one-factor solution of the CRU Scale was confirmed. The reliability was acceptable (>0.7 in the entire sample and in all provider groups) for 10 of 13 ACT concepts, and high (0.90–0.96) for the CRU Scale. We could demonstrate partial strong MI for both ACT models and partial strict MI for the CRU Scale. Our results suggest that the scores of the German ACT and the CRU Scale for nursing

  2. Efficient utilization of wind power: Long-distance transmission or local consumption?

    Science.gov (United States)

    Sun, Yuanzhang; Ma, Xiyuan; Xu, Jian; Bao, Yi; Liao, Siyang

    2017-09-01

    Excess wind power produced in wind-intensive areas is normally delivered to remote load centers via long-distance transmission lines. This paper presents a comparison between long-distance transmission, which has gained popularity, and local energy consumption, in which a fraction of the generated wind power can be locally consumed by energy-intensive industries. First, the challenges and solutions to the long-distance transmission and local consumption of wind power are presented. Then, the two approaches to the utilization of wind power are compared in terms of system security, reliability, cost, and capability to utilize wind energy. Finally, the economic feasibility and technical feasibility of the local consumption of wind power are demonstrated by a large and isolated industrial power system, or supermicrogrid, in China. The coal-fired generators together with the short-term interruptible electrolytic aluminum load in the supermicrogrid are able to compensate for the intermittency of wind power. In the long term, the transfer of high-energy-consumption industries to wind-rich areas and their local consumption of the available wind power are beneficial.

  3. Efficient utilization of wind power: Long-distance transmission or local consumption?

    Institute of Scientific and Technical Information of China (English)

    Yuanzhang SUN; Xiyuan MA; Jian XU; Yi BAO; Siyang LIAO

    2017-01-01

    Excess wind power produced in wind-intensive areas is normally delivered to remote load centers via long-distance transmission lines.This paper presents a comparison between long-distance transmission,which has gained popularity,and local energy consumption,in which a fraction of the generated wind power can be locally consumed by energy-intensive industries.First,the challenges and solutions to the long-distance transmission and local consumption of wind power are presented.Then,the two approaches to the utilization of wind power are compared in terms of system security,reliability,cost,and capability to utilize wind energy.Finally,the economic feasibility and technical feasibility of the local consumption of wind power are demonstrated by a large and isolated industrial power system,or supermicrogrid,in China.The coal-fired generators together with the shortterm interruptible electrolytic aluminum load in the supermicrogrid are able to compensate for the intermittency of wind power.In the long term,the transfer of highenergy-consumption industries to wind-rich areas and their local consumption of the available wind power are beneficial.

  4. Sustainable Civil-Society Engagement: Potentials of a Transnational Civil Society in French-German, Polish-German, and Czech-German Border Regions

    Directory of Open Access Journals (Sweden)

    Klaus Boehnke

    2015-04-01

    Full Text Available Based on representative survey data, the present study examines potentials for the sustainable development of a transnational civil society in French-German, Polish-German, and Czech-German border regions. The theoretical framework is a social capital approach in the tradition of Putnam. Transnational engagement is seen as a key element for the development of a border-crossing civil society. For the analysis, existing forms of social capital were classified according to their bridging and bonding functions and the potentials of local and transnational activities are described. Furthermore, using multilevel analysis, the predictive power of different variables like individual dispositions and specific contexts of the regions on cross-border activities are examined. Descriptively, the expected lower level of local civil-society engagement, in general, and also with regard to the transnational activities was found for post-socialist border regions. It is shown that, first and foremost, existing experience in civil-society engagement in the local context is a high-impact predictor for both transnational activities and an interest in such activities. Other variables like feelings of a historical burden or the economic situation of the region are less important.

  5. Studies on the effectiveness of measures to maintain the integrity of pressurized components in German nuclear power plants. Final report

    International Nuclear Information System (INIS)

    Elmas, M.; Jendrich, U.; Michel, F.; Reck, H.; Schimpfke, T.; Walter, M.; Wenke, R.

    2013-03-01

    The overall objective of the project was to investigate the effectiveness of measures to maintain the as-built quality of the pressure-retaining components in German nuclear power plants. In particular, investigations were performed on the application of the break preclusion concept, existing monitoring systems and the significance of the pressure test as part of the inspection concept. Moreover, the KompInt knowledge base has been updated. Break preclusion for pipes was applied in all German plants already during planning or after commissioning to a varying extent. The basic features of the required assessments were considered in the German nuclear regulations for the first time by inclusion in the safety requirements for nuclear power plants of 2012. The requirements for assessments, differing in their degree of detail, in the interpretations of these safety requirements and in the safety standard KTA 3206 are still in the draft stage. For the first time, the vessels as well as housings of valves and pumps are also included in the concept. Through the use of advanced monitoring systems it was possible in German plants at an early stage to establish modes of operation that minimise the load on components, to carry out appropriate technical backfitting measures, and to identify damages. In plant areas where local water chemistry parameters may result that deviate from the specification, the effectiveness of water chemistry monitoring is limited. In this case, other operational measures must be taken. The results of the simulations performed with the help of the GRS-developed PROST computer code to determine the significance of pressure tests lead - in accordance with the results of operating experience evaluation - to the conclusion that pressure tests carried out within the pressure-retaining boundary contribute to safeguarding the integrity. The user-friendliness of the KompInt knowledge base has been increased by changing over to a new hardware, a software

  6. Cash Holdings and Leverage of German Listed Firms

    DEFF Research Database (Denmark)

    Rapp, Marc Steffen; Killi, Andreas Maximilian

    2016-01-01

    We examine cash holdings and leverage levels of German listed (non-financial and non-utility) firms. We document a secular increase in cash ratios over the last twenty years (1992–2011), reducing the net debt book leverage ratio for the average sample firm close to zero. Using prediction models...... firms are associated with measures of uncertainty faced by firms. Our results suggest that German firms have increased (reduced) their cash (net debt leverage) levels over time in order to adopt more precautionary financial policies....

  7. Anticipatory opt-out of nuclear power at German universities and research centers? Employment and education opportunities in the nuclear field

    International Nuclear Information System (INIS)

    Fritz, P.; Closs, K.D.; Kuczera, B.; Erlenwein, P.; Langetepe, G.; Weiss, F.P.; Wolfert, K.

    2001-01-01

    The energy policy objectives of the present German federal government include the regulated, not-to-be-indemnified termination of the use of nuclear power for electricity generation in Germany. This objective was initialed in an agreement between the federal government and the operators of nuclear power plants in June 2000. The criterion it contains for the residual life of existing nuclear power plants are the 'residual electricity volumes' to be generated by existing plants. According to present data, the first nuclear power plant would be decommissioned in late 2002, the last one, in early 2021. A report by an evaluating committee established by the competent German Federal Ministry of Economics and Technology published in January 2000 indicates that, even in the light of this medium-term perspective for the use of nuclear power for electricity generation, sufficient competence in terms of manpower in this field must be maintained and promoted in all areas of research, industry, expert consultant organizations, and regulatory authorities far beyond 2021. This makes government support indispensable in the light of the political criteria requiring the preservation of competence in this sector. The 'Kompetenzverbund Kerntechnik' (Association for Nuclear Technology Competence) was established within the framework of the Energy Research Division of the Hermann von Helmholtz-Gemeinschaft Deutscher Forschungszentren. Its mandate outlines its objectives as follows: 'Irrespective of political decisions establishing criteria for terminating the use of nuclear power in Germany, it is necessary that competence in nuclear safety be preserved for the next few decades. Only this will ensure that the government's provident duties can be fulfilled, and the safety of nuclear installations and waste and spent fuel management pathways can be ensured in accordance with the international state of the art'. (orig.) [de

  8. Possibilities of utilizing power plant fly ashes

    Directory of Open Access Journals (Sweden)

    Mezencevová Andrea

    2003-09-01

    Full Text Available The burning of fossil fuels in industrial power stations plays a significant role in the production of thermal and electrical energy. Modern thermal power plants are producing large amounts of solid waste, mainly fly ashes. The disposal of power plant waste is a large environmental problem at the present time. In this paper, possibilities of utilization of power plant fly ashes in industry, especially in civil engineering, are presented. The fly ash is a heterogeneous material with various physical, chemical and mineralogical properties, depending on the mineralogical composition of burned coal and on the used combustion technology. The utilization of fly ashes is determined of their properties. The fineness, specific surface area, particle shape, density, hardness, freeze-thaw resistance, etc. are decisive. The building trade is a branch of industry, which employs fly ash in large quantities for several decades.The best utilization of fluid fly ashes is mainly in the production of cement and concrete, due to the excellent pozzolanic and cementitious properties of this waste. In the concrete processing, the fly ash is utilized as a replacement of the fine aggregate (fine filler or a partial replacement for cement (active admixture. In addition to economic and ecological benefits, the use of fly ash in concrete improves its workability and durability, increases compressive and flexural strength, reduces segregation, bleeding, shrinkage, heat evolution and permeability and enhances sulfate resistance of concrete.The aim of current research is to search for new technologies for the fly ash utilization. The very interesting are biotechnological methods to recovery useful components of fly ashes and unconventional methods of modification of fly ash properties such as hydrothermal zeolitization and mechanochemical modification of its properties. Mechanochemistry deals with physico - chemical transformations and chemical reactions of solids induced by

  9. Harmonization of French and German calculation procedures for atmospheric dispersion following accidental releases from nuclear power plants

    International Nuclear Information System (INIS)

    Crabol, B.; Romeo, E.; Nester, K.

    1992-01-01

    In case of an accident in a nuclear power plant near the French-German border different schemes for dispersion calculations in both countries will currently be applied. An intercomparison of these schemes initiated from the German-French Commission for the safety of nuclear installations (DFK) revealed in some meteorological situations large differences in the resulting concentrations for radionuclides. An ad hoc working group was installed by the DFK with the mandate to analyse the reasons for the different model results and also to consider new theoretical concepts. The working group has agreed to apply a Gaussian puff model for emergency response calculations. The results of the model based on turbulence parameterization via similarity approach or spectral theory - have been compared with tracer experiments for different emission heights and atmospheric stability regimes. As a reference the old modelling approaches have been included in the study. The simulations with the similarity approach and the spectral theory show a slightly better agreement to the measured concentration data than the schemes used in the past. Instead of diffusion categories both new approaches allow a continuous characterization of the atmospheric dispersion conditions. Because the spectral approach incorporates the sampling time of the meteorological data as an adjustable parameter thereby offering the possibility to adjust the dispersion model to different emission scenarios this turbulence parameterization scheme will be foreseen as the basis for a joint French-German puff model

  10. The German risk study. Pt. 2

    International Nuclear Information System (INIS)

    Burkart, K.

    1980-01-01

    A severe nuclear power plant accident can be followed by a considerable release of radioactive effluents into the atmosphere. Due to atmospheric dispersion, areas of different sizes can be contaminated. The corresponding doses can cause early illnesses, early fatalities, latent effects and genetic effects. They are accompanied by economic effects. Within the consequence model of the German Risk Study, early and late fatalities and genetically significant doses are calculated. The calculations are based on real data or phenomena such as the population around 19, present or future German sites, or 115 real weather sequences, as well as on models such as an atmospheric dispersion model, a dose model, a model of protective actions or a health effects model. Within this lecture, the consequence model applied in the German Risk Study will be discussed in detail and the results will be presented. (orig./RW)

  11. Telecommunications: international opportunities for power utilities

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, A. [Teleglobe Canada, Ottawa, ON (Canada)

    1996-08-01

    International telecommunications services markets and trends were reviewed in an effort to identify business opportunities for Canadian power utilities. With increasing deregulation in the U.S. and Canada, and other countries around the globe, market opportunities are beginning to open up. In monopoly markets opportunities exist in providing dual infrastructures to upgrade both the power delivery services (frequently poor), and telecommunications. Billing, collection and customer service expertise might be other marketable commodities, perhaps packaged as part of a network provision project as a service to existing power and telecommunications service providers. In countries with directed competition markets local partnerships may be the only vehicle for entering the market. In managed competition markets opportunities were said to exist in cellular radio technology, as well as in switched telephone service, local, long distance, or international. In general, opportunities outside telecommunications-rich North America were considered to have better potential, due to rapid deregulation and higher current growth rates in telecommunications. Careful examination and research of the political and business environment prior to entering any of the potentially fertile areas was advised.

  12. Power Dependence in Individual Bargaining: The Expected Utility of Influence.

    Science.gov (United States)

    Lawler, Edward J.; Bacharach, Samuel B.

    1979-01-01

    This study uses power-dependence theory as a framework for examining whether and how parties use information on each other's dependence to estimate the utility of an influence attempt. The effect of dependence in expected utilities is investigated (by role playing) in bargaining between employer and employee for a pay raise. (MF)

  13. Conference report 11th German atomic energy law symposium

    International Nuclear Information System (INIS)

    Anon.

    2001-01-01

    The 11 th German Atomic Energy Law Symposium organized by the Federal Ministry for the Environment, Nature Conservation, and Nuclear Safety (BMU) was held in Berlin on October 9 and 10, 2001. Approximately 250 participants from industry, politics, administration, science, and associations had accepted the invitation by BMU and discussed a variety of questions arising mainly out of the new nuclear energy policy of the federal government. In the introductory session, Federal Minister for the Environment Juergen Trittin sketched the framework of federal policy resulting from the criteria set forth by the federal government and the negotiations with the power utilities after the agreement on the future use of nuclear power had been signed. The following seven technical sessions dealt with basic constitutional matters as well as problems of public law and economic law stemming from the nuclear power policy of the federal government. Major points included the amendment to the Atomic Energy Act, interim storage, the redefined objectives of final storage, and problems relating to yardsticks by which to gauge safety, and problems of ensuring safety. Among other subjects, also the relationship between the federal government and the federal states in nuclear regulatory matters as well aspects of power economy and energy policy were debated. (orig.) [de

  14. Utilization of agricultural waste in power production

    Energy Technology Data Exchange (ETDEWEB)

    Clausen, J.C. [ELSAMPROJEKT A/S, Fredericia (Denmark); Rasmussen, I. [MIDTKRAFT Power Co., Aarhus (Denmark)

    1993-12-31

    It is a goal of the Danish energy policy for the last decade to reduce energy consumption and to introduce fuels for power production with less CO{sub 2} emission than coal. This measure has caused a considerable effort by the Danish utilities to develop technologies that reduce CO{sub 2} emissions without causing heavy cost increases of power. Agricultural waste in the form of surplus straw is available in an amount equivalent to 20% of the annual coal imports to Denmark. Straw firing is difficult due to its significant contents of alkaline components. Consequently, its utilization presupposes the development of new technologies. The biomass development program is concentrated on two ways which are (1) co-firing of existing coal fired power station with a modest amount of straw and (2) development of CFB technology that allows a high share of biomass as well as coal only. These options were tested in a coal fired 70 MW spreader stoker unit and a 125 MW PF unit. Approx. 4000 t of straw were burned. Additional tests will be launched this autumn, burning 35,000 t of straw at rates up to 20% straw. The CFB option is pursued from the platform of a 80 MWth unit, operational early `92. This plant burns a mix of 50% straw and 50% coal and consumes annually 70.000 t of straw. Future development is aiming towards CFBs of 250 MW(e), burning in excess of 50% biomass.

  15. Incentive regulation of nuclear power plants by state public utility commissions

    International Nuclear Information System (INIS)

    Petersen, J.C.

    1987-12-01

    This report on incentive regulation of nuclear power plants by state public utility commissions (PUCs). Economic performance incentives established by state PUCs are applicable to the construction or operation of about 45 nuclear power reactors owned by 30 utilities in 17 states. The NRC staff monitors development of the incentives and periodically provides an updated report on all nuclear plant incentives to its regional offices. The staff maintains contact with the PUCs and the utilities responsible for implementing the incentives in order to obtain the updated information and to consider potential safety effects of the incentives. This report presents the NRC staff's concerns on potential safety effects of economic performance incentives. It also includes a plant-by-plant survey that describes the mechanics of each incentive and discusses the financial effects of the incentive on the utility-owner(s) of the plant

  16. Incentive regulation of investor-owned nuclear power plants by public utility regulators

    International Nuclear Information System (INIS)

    McKinney, M.D.; Elliot, D.B.

    1993-01-01

    The US Nuclear Regulatory Commission (NRC) periodically surveys the Federal Energy Regulatory Commission (FERC) and state regulatory commissions that regulate utility owners of nuclear power plants. The NRC is interested in identifying states that have established economic or performance incentive programs applicable to nuclear power plants, including states with new programs, how the programs are being implemented, and in determining the financial impact of the programs on the utilities. The NRC interest stems from the fact that such programs have the potential to adversely affect the safety of nuclear power plants. The information in this report was obtained from interviews conducted with each state regulatory agency that administers an incentive program and each utility that owns at least 10% of an affected nuclear power plant. The agreements, orders, and settlements that form the basis for each incentive program were reviewed as required. The interviews and supporting documentation form the basis for the individual state reports describing the structure and financial impact of each incentive program

  17. Statistical utility theory for comparison of nuclear versus fossil power plant alternatives

    International Nuclear Information System (INIS)

    Garribba, S.; Ovi, A.

    1977-01-01

    A statistical formulation of utility theory is developed for decision problems concerned with the choice among alternative strategies in electric energy production. Four alternatives are considered: nuclear power, fossil power, solar energy, and conservation policy. Attention is focused on a public electric utility thought of as a rational decision-maker. A framework for decisions is then suggested where the admissible strategies and their possible consequences represent the information available to the decision-maker. Once the objectives of the decision process are assessed, consequences can be quantified in terms of measures of effectiveness. Maximum expected utility is the criterion of choice among alternatives. Steps toward expected values are the evaluation of the multidimensional utility function and the assessment of subjective probabilities for consequences. In this respect, the multiplicative form of the utility function seems less restrictive than the additive form and almost as manageable to implement. Probabilities are expressed through subjective marginal probability density functions given at a discrete number of points. The final stage of the decision model is to establish the value of each strategy. To this scope, expected utilities are computed and scaled. The result is that nuclear power offers the best alternative. 8 figures, 9 tables, 32 references

  18. A strategy for improving the profitability of utility power plants in a deregulated industry

    International Nuclear Information System (INIS)

    Reinhart, E.R.

    1996-01-01

    When deregulation of the utility industry becomes a reality in the near future, power plant managers and engineers will face a completely changed business climate. Surviving in a competitive business world will require a dramatic alteration in the way most utility power plants are maintained and upgraded, and in their budget planning. Strategies will have to be developed and implemented that follow the guidelines of good business practices in competitive industries. Some utilities have already started to reduce overhead maintenance costs. Key aspects of their programs can serve as examples to other utilities who want to develop a strategy to improve their operating cost effectiveness. Cost-cutting measures have included development of procedures and data bases that allowed utilities to become independent of original equipment manufacturer (OEM) support and to keep their costs for maintenance, repairs, and replacement of power plant components to a minimum. Also, scheduled power plant outages based on the concepts of reliability-centered maintenance (Smith, 1993), remaining life assessment, and advanced integrity monitors instead of a fixed calendar (Swanekamp, 1996), have allowed utilities to extend the time between some outages by several years. These and other innovative approaches will become critical to power plants operating in the new, deregulated business climate. Examples of actual cost savings are presented here

  19. German Studies in America. German Studies Notes.

    Science.gov (United States)

    Sander, Volkmar; Osterle, Heinz D.

    This volume contains two papers, "German Studies in America," by Volkmar Sander, and "Historicism, Marxism, Structuralism: Ideas for German Culture Courses," by Heinz D. Osterle. The first paper discusses the position of German studies in the United States today. The greatest challenge comes from low enrollments; therefore,…

  20. Analysis of human factor aspects in connection with available incident reports obligatorily reported by German nuclear power plants

    International Nuclear Information System (INIS)

    Wilpert, B.; Freitag, M.; Miller, R.

    1993-01-01

    Goal of the present study is the analysis of human factor aspects in connection with available incident reports obligatorily reported by German nuclear power plants. Based on psychological theories and empirical studies this study develops a classification scheme which permits the identification of foci of erroneous human actions. This classification scheme is applied to a selection of human factor relevant incidents by calculating frequencies of the occurrence of human error categories. The results allow insights into human factor related problem areas. (orig.) [de

  1. Railway power supply - free of crises and independent

    International Nuclear Information System (INIS)

    Weigert, E.

    1981-01-01

    The German Federal Railway realizes 84% of its transport performance by electric traction. The prevailing primary energy source of the railway electric power supply is coal, but the DB uses also furnace gas, nuclear energy and hydroelectric power. The shave of mineral oil lies by about 5%. The public utilities deliver about 15%. The dispersed situation of the power stations and converter stations over the whole supply area offers the advantage of short transport distances. Therefore the 110-kV-railway mains especially meets distribution demands. Very useful is the compound operation with the Austrian Federal Railways and the Swiss Federal Railways. (orig.) [de

  2. Psychohistory before Hitler: early military analyses of German national psychology.

    Science.gov (United States)

    Bendersky, J W

    1988-04-01

    As part of a grandiose post-World War I psychological project to predict the behavior of nations, the U.S. Military Intelligence Division (MID) utilized racial and social psychological theories to explain an alleged problematic German national character. Though unsuccessful, this project has major significance in the history of psychohistory. For the newly discovered MID files reveal that ideas, attitudes, and biases many psychohistorians subsequently identified as manifestations of a peculiar German national character had previously been held by American officers and reputable psychologists. What American analysts would, in 1940, view as symptoms of a maladjusted German mind, their predecessors had, in 1920, considered valid scientific concepts.

  3. Future prospects of the brown coal of central and east Germany in the all-German energy industry. Perspektive der mittel- und ostdeutschen Braunkohle in der gesamtdeutschen Energiewirtschaft

    Energy Technology Data Exchange (ETDEWEB)

    Milojcic, G

    1991-04-01

    Against a background of different basic conditions the energy industry in the former German Democratic Republic during the last 30 years underwent an entirely different development to that which occurred in the former Federal Republic of Germany. In the Federal Republic, oriented to a free market system, a structural change took place from the 1960s onwards, that is to say, away from solid fuels and towards a mixed energy utilization, in which mineral oil and natural gas in particular play a significant part. The principal market for coal, especially brown coal, is the important power generation sector. The German Democratic Republik, on the other hand, in keeping with its autarchic energy policy relied on the only source of energy available in large quantities, namely brown coal. The reason for this lay in the fact that the system made it impossible to participate in an international exchange of commidities. As a result of the ton-quota ideology and inefficiency in all sectors of energy winning, conversion and utilization the consumption both of primary energy and also of electricity in the former German Democratic Republic was high compared to that in the Federal Republic, and this in spite of the fact that the per capita economic strength was less than half that of the Federal Republic. Two changes are likely to occur in future. On the one hand, a medium-term mixed energy utilization will develop in the primary energy sector, as has been the case in the Federal Republic. On the other hand, it can be assumed that simultaneously with this development consumption will tend to decrease. As in the Federal Republic, the future prospect to brown coal, which has hitherto played a dominating role, will in the first place lie in its utilization in conjunction with the power industry and only secondarily on the thermal energy market. (orig.).

  4. Incentive regulation of nuclear power plants by state Public Utility Commissions

    International Nuclear Information System (INIS)

    Martin, R.L.; Olson, J.; Hendrickson, P.

    1989-12-01

    Economic performance incentives established by state Public Utility Commissions (PUCs) currently are applicable to the construction or operation of approximately 73 nuclear power reactors owned by 27 utilities with investment greater than 10% in 18 states. The NRC staff monitors development of the incentives and periodically provides an updated report on all nuclear plant incentives to its headquarters and regional offices. The staff maintains contact with the PUCs and the utilities responsible for implementing the incentives in order to obtain the updated information and to consider potential safety effects of the incentives. This report on incentive regulation of nuclear power plants by state PUCs presents the NRC staff's concerns on potential safety effects of economic performance incentives. It also includes a plant-by-plant survey that describes the mechanics of each incentive and discusses the financial effects of the incentive on the utility-owner(s) of the plant

  5. Utility challenges in a competitive power industry

    International Nuclear Information System (INIS)

    Roberts, J.

    2001-01-01

    Allete, formerly Minnesota Power, is no longer an electric utility, but a broadly-diversified company operating in 39 states and 8 Canadian provinces. Allete provides retail services in their water and energy business. In addition, they provide wholesale services in their automotive service business, they sell land to developers and have entered into the telecommunications and paper making industry. Diversification has been successful for Allete, and has resulted in a strong balance sheet and cash flow. Graphs depicting the company's business earnings, assets and growth rates were included in this power point presentation. Allete plans to triple its size and continue to maintain its annual growth of 10 per cent or better. tabs., figs

  6. Large-scale utilization of wind power in China: Obstacles of conflict between market and planning

    International Nuclear Information System (INIS)

    Zhao Xiaoli; Wang Feng; Wang Mei

    2012-01-01

    The traditional strict planning system that regulates China's power market dominates power industry operations. However, a series of market-oriented reforms since 1997 call for more decentralized decision-making by individual market participants. Moreover, with the rapid growth of wind power in China, the strict planning system has become one of the significant factors that has curtailed the generation of wind power, which contradicts with the original purpose of using the government's strong control abilities to promote wind power development. In this paper, we first present the reasons why market mechanisms are important for large-scale utilization of wind power by using a case analysis of the Northeast Grid, and then we illustrate the impact of conflicts between strict planning and market mechanisms on large-scale wind power utilization. Last, we explore how to promote coordination between markets and planning to realize large-scale wind power utilization in China. We argue that important measures include implementing flexible power pricing mechanisms instead of the current fixed pricing approach, formulating a more reasonable mechanism for distributing benefits and costs, and designing an appropriate market structure for large-scale wind power utilization to promote market liquidity and to send clear market equilibrium signals. - Highlights: ► We present the reasons why market is important for utilization of wind power. ► We discuss the current situation of the conflict between planning and market. ► We study the impact of conflict between planning and market on wind power output. ► We argue how to promote coordination between market and planning.

  7. Demand response concepts in the German industry; Konzepte zur Lastreaktion in der deutschen Industrie

    Energy Technology Data Exchange (ETDEWEB)

    Roon, Serafin von; Gobmaier, Thomas [Forschungsstelle fuer Energiewirtschaft (FfE) e.V., Muenchen (Germany)

    2011-07-01

    In the German industry the concept of load management for peak shaving is well established. Pooling these reserve power enables reliable power supply at short notice. In the U.S. this business concept - called Demand Response - is already quite successful. The article summarizes findings on the status quo and the technical and economic potential of implementing Demand Response in the German industry. (orig.)

  8. The potential of decentralized power-to-heat as a flexibility option for the german electricity system: A microeconomic perspective

    International Nuclear Information System (INIS)

    Ehrlich, Lars G.; Klamka, Jonas; Wolf, André

    2015-01-01

    One fundamental challenge of the German energy transition for the electricity market is the growing imbalance between inflexible generation and generally inelastic load. Against this background, we investigate the future potential of decentralized Power-to-Heat (P2H) as an additional demand-side flexibility option for the German electricity system. Precisely, we analyze the case of hybrid systems, where conventional gas and oil condensing boiler systems are equipped with an electric heating rod. In contrast to previous approaches, we set our focus on the economic incentives at household level: only if the switch to a P2H-hybrid system can reduce individual heating expenses significantly, a considerable number of these systems will be installed. For this purpose, we implemented an integrated approach combining three distinct simulation modules. First, a stochastic simulation of the electricity spot market prices in 2020 was conducted. Second, average heat load profiles were generated based on a standard bottom-up analysis. Both results were then fed into an optimization model calculating the cost-minimizing paths of heat generation at household level during the year 2020. The simulated annual savings prove modest as long as household electricity prices are not heavily reduced through political influence. - Highlights: • We investigate the future potential of decentralized Power-to-Heat. • Focus lies on hybrid Power-to-Heat systems with condensing gas or oil boiler. • We analyze the economic incentives at household level. • Simulation of heat load profiles and spot prices in 2020. • Savings prove modest as long as household electricity prices are not heavily reduced.

  9. Power supply and environment protection

    International Nuclear Information System (INIS)

    Tettinger, P.J.; Filipek, J.; Jendroska, J.

    1992-01-01

    The 16 lectures by German and Polish scientists have all been entered into the data base. They deal among other things with the common market for power and the constraints placed on it by EC law; local power supply in the Federal German Republic; intercommunal cooperation for satisfying local power demand; public participation in power law; ways of accelerating procedures etc. (HSCH) [de

  10. French pollution and German lignite

    International Nuclear Information System (INIS)

    Foos, Jacques

    2015-01-01

    After having recalled that the German energy transition is based on a complete shutting down of nuclear power stations to replace them by renewable energy sources on the one hand, and by coal (lignite, i.e. the dirtiest coal) and gas on the other hand to compensate the intermittency of the former ones, this article notices that pollution peaks occurred in France when an eastern of north-eastern wind was blowing, and not in case of western wind. The author then wanders whether this pollution comes from Germany, and more particularly from the releases of lignite-fuelled power stations. Then, the author comments the high level of pollution associated with coal extraction and exploitation in Germany, causing thousands of deaths and resulting in lung diseases or cancers, myocardial infractions. The author then makes a parallel between, on the one hand, the ignorance of this German pollution and, on the other hand, evacuation measures around Fukushima for a radioactivity which the author considers as less dangerous in terms of life expectancy

  11. On the state of the art and some trends in industrial utilization of nuclear power

    International Nuclear Information System (INIS)

    Rockstroh, R.

    1980-01-01

    The status achieved in nuclear power utilization in the world and the prospects of further development are presented. Concerning the technological maturity as well as the economy and the environmental aspects the experience hitherto obtained enables the conclusion that nuclear plants have not to fear any comparison with conventional power stations. The social difficulties in the industrially developed capitalist countries in managing the complex problems of utilizing nuclear power are described and commented. Some political aspects of further nuclear power development are also indicated. Information is given about the measures and some objectives for acceleration of nuclear power utilization in the CMEA member states. (author)

  12. Webtechnology and internet services at power rail systems of German Railway DB AG; Nutzung von Webtechnologien und Internet-Diensten bei der Energieversorgung der Deutschen Bahn

    Energy Technology Data Exchange (ETDEWEB)

    Walther, J.T. [DB Energie, Frankfurt am Main (Germany)

    2007-07-01

    Internet services and the technologies of the World Wide Web are used at power rail systems of German Railway in some processes. Important applications are systems support, service and parametering of substation control- and protection equipment and the monitoring of switches and power transformers. The performance of the security claims of the asset management and the IT-Department are a condition for implementation these technologies. (orig.)

  13. [Comparison of hand surgery in the German and Italian DRG systems].

    Science.gov (United States)

    Lotter, O; Dolderer, J; Stahl, S; Atzei, A; Haerle, M; Schaller, H E

    2011-12-01

    Diagnosis-related groups (DRGs) are a patient classification system grouping related types of patients treated to the resources they consumed. In this analysis we compared the Italian and the German DRG systems regarding hand surgery with an emphasis on reimbursement of clinical cases. The 15 most common hand surgical diagnoses and their corresponding operative treatment in our clinic in 2009 were processed using a DRG grouper. The underlying data were transferred to the Italian system. Thus, the length of stay and the reimbursement of both countries could be obtained and compared. The latter was adjusted and corrected by the purchasing power of each country. The mean of the upper threshold of length of stay was 10 days in the German as well as the Italian system whereas the median was 2 times higher in Italy (6 vs. 12 days). Fifteen out of 19 cases showed higher reimbursement in Germany. The case mix index (CMI) of 0.917 in Germany represents a mean payment of 2,676 € per case. In Italy the hypothetical CMI of 0.635 resulted in a mean reimbursement of 1,853 € per case. The biggest difference in remuneration could be found for replantation of multiple fingers. For this service the German health-care system pays 12,320 € more than the Italian. Total proceeds of the top 15 diagnoses applying the number of cases treated in our clinic revealed 1.7 million € in the German and 1.2 million € in the Italian DRG system. Considering the purchasing power utilizing consumer prize parities, the difference of reimbursement between the countries decreased to 300,000 €. There is no mean length of stay per DRG in Italy, only the upper threshold of length of stay is determined. In most cases the latter is higher in Italy compared to Germany. The consumption of resources for finger replantation is not adequately represented in the Italian DRG system compared to finger amputation. Reimbursement of inpatient care is influenced by multiple factors not being subject

  14. Power supply in future: ecological aspects

    International Nuclear Information System (INIS)

    Hustedt, M.

    2000-01-01

    The most important prerequisites for an ecological supply of energy in the future is the opting out of nuclear energy and the completion of the second and third phase of the socio-ecological tax reform. As a part of our energy will continue to be generated on the basis of fossil fuels in the foreseeable future, it is essential that a radical change takes place in the efficiency of fossil energy engineering. In addition to this, any possible energy-saving potential must be exploited; this includes the new energy-saving law, promoting the modernisation of old buildings and modern energy management (heat insulation, heating engineering, warm water heating etc.). For an ecological power supply the share of renewable energies must be increased to form a major pillar of our power supply. The '100,000-roof' programme of the German federal government and the development programme for near-market renewable energy sources form part of this approach. Energy research should shift its orientation and accelerate the conversion of our power supply: priority should be given to developing energy-saving technologies and renewable energy. Supporting municipalities and public utilities is especially important. This means revising the basic conditions of energy laws so that they assist public utilities to face competition as power utilities. (orig.) [de

  15. Main results of the German nuclear power plant risk study

    International Nuclear Information System (INIS)

    Danzmann, H.J.

    1981-01-01

    The subject is discussed under the headings: introduction; purpose and task of the German risk study; approach; results of investigations (analyses of engineered plant features; determination of accident consequences); emergency response model; protective actions and countermeasures; evaluation. (U.K.)

  16. Training of power plant operating personnel

    International Nuclear Information System (INIS)

    Kraftwerksschule, E.V.

    1986-01-01

    In Germany, professional training of power plant operating personnel became an important issue in the fifties, when power plant parameters as well as complexity of instrumentation and control increased considerably. Working Groups of VGB Technische Vereiningung der Grosskraftwerketreiber e.v. (Association of Large Power Plant Operators) developed a professional career for power plant operating personnel and defined pre-requisites, scope and objectives of training. In 1957 the German utilities founded KRAFTWERKSSCHULE E.V. (kws) as a school for theoretical training and for guidance of practical training in the power plants. KWS is a non-profit organisation and independent of authorities. Today KWS has 127 members in Germany and in 6 other countries. The objectives of KWS include the training of: -Kraftwerker (control room operators; - Kraftwerksmesiter (shift supervisors); and - shift engineers; according the guidelines of the VGB

  17. Where U.S. utilities seek fuel to power reactors after 1985

    International Nuclear Information System (INIS)

    Anon.

    1977-01-01

    How utilities try to assure uranium supplies emerged Feb. 25 at a press conference in Canberra with four representatives of utilities that supply 20% of the operating nuclear capacity in the United States. Earlier, the speakers indicated that American import requirements would far exceed Australian estimates of the potential export market for Australian uranium. Australia, with the world's largest uncommitted uranium reserves, is wary of exporting because the opposition Labor Party adamantly opposes uranium development. If Labor returns to power, it could decide not to honor contracts by the present government. Participants included: Bernard Cherry, fuel manager at General Public Utilities; Colin Campbell of the Yankee Atomic Service Co., which provides engineering and fuel-supply service for seven New England nuclear plants; Jack Gilleland, assistant manager of power at the Tennessee Valley Authority; and Ralph Bostian, manager for systems results and fuel management at the Duke Power Co. When asked about available uranium supplies from Africa, the participants were dubious about those supplies; this led to a discussion on why the utilities are seeking their own sources. The answers are obvious. ERDA has indicated that about one-half of the operating reactors have fuel coverage beyond six reloads and about one-half of the reactors under construction have fuel coverage beyond two reloads

  18. Utilization of complementary and alternative medicine (CAM) among children from a German birth cohort (GINIplus): patterns, costs, and trends of use.

    Science.gov (United States)

    Italia, Salvatore; Brand, Helmut; Heinrich, Joachim; Berdel, Dietrich; von Berg, Andrea; Wolfenstetter, Silke Britta

    2015-03-10

    The use of complementary and alternative medicine (CAM) is widespread among children in Germany and other European countries. Only a few studies are available on trends in pediatric CAM use over time. The study's objective was to present updated results for prevalence, predictors, and costs of CAM use among German children and a comparison with findings from a previous follow-up of the same birth cohort. Data were collected for 3013 children on their utilization of medicinal products (during the last 4 weeks) and consultation with CAM providers (in the preceding year) from a German birth cohort study (GINIplus, 15-year follow-up) using a self-administered questionnaire. The reported medicinal CAMs were classified into six categories (homeopathy, herbal drugs, nutritionals, minerals and trace elements, microorganisms, further CAM). Drug prices were traced using pharmaceutical identification numbers (PZNs), or otherwise conservatively estimated. Finally, the results were compared with data obtained from the 10-year follow-up of the same birth cohort study by adopting the identical methodology. In all, 26% of the reported 2489 drugs were medicinal CAM. The 4-week prevalence for homeopathy and herbal drug use was 7.5% and 5.6%, respectively. Some 13.9% of the children used at least one type of medicinal CAM in the preceding 4 weeks. The 1-year prevalence for consultation with CAM providers was 10.8%. From the drugs identified as CAM, 53.7% were homeopathic remedies, and 30.8% were herbal drugs. Factors associated with higher medicinal CAM use were female gender, residing in Munich, and higher maternal education. A homeopathy user utilized on average homeopathic remedies worth EUR 15.28. The corresponding figure for herbal drug users was EUR 16.02, and EUR 18.72 for overall medicinal CAM users. Compared with the 10-year follow-up, the prevalence of homeopathy use was more than halved (-52%) and dropped substantially for herbal drug use (-36%) and overall CAM use (-38

  19. Advanced Grid-Friendly Controls Demonstration Project for Utility-Scale PV Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Gevorgian, Vahan; O' Neill, Barbara

    2016-01-21

    A typical photovoltaic (PV) power plant consists of multiple power electronic inverters and can contribute to grid stability and reliability through sophisticated 'grid-friendly' controls. The availability and dissemination of actual test data showing the viability of advanced utility-scale PV controls among all industry stakeholders can leverage PV's value from being simply an energy resource to providing additional ancillary services that range from variability smoothing and frequency regulation to power quality. Strategically partnering with a selected utility and/or PV power plant operator is a key condition for a successful demonstration project. The U.S. Department of Energy's (DOE's) Solar Energy Technologies Office selected the National Renewable Energy Laboratory (NREL) to be a principal investigator in a two-year project with goals to (1) identify a potential partner(s), (2) develop a detailed scope of work and test plan for a field project to demonstrate the gird-friendly capabilities of utility-scale PV power plants, (3) facilitate conducting actual demonstration tests, and (4) disseminate test results among industry stakeholders via a joint NREL/DOE publication and participation in relevant technical conferences. The project implementation took place in FY 2014 and FY 2015. In FY14, NREL established collaborations with AES and First Solar Electric, LLC, to conduct demonstration testing on their utility-scale PV power plants in Puerto Rico and Texas, respectively, and developed test plans for each partner. Both Puerto Rico Electric Power Authority and the Electric Reliability Council of Texas expressed interest in this project because of the importance of such advanced controls for the reliable operation of their power systems under high penetration levels of variable renewable generation. During FY15, testing was completed on both plants, and a large amount of test data was produced and analyzed that demonstrates the ability of

  20. … but You Are Not German." -- Afro-German Culture and Literature in the German Language Classroom

    Science.gov (United States)

    Schenker, Theresa; Munro, Robert

    2016-01-01

    Units and classes dedicated to multiculturalism in Germany have predominantly focused on Turkish-German literature and culture. Afro-Germans have been a minority whose culture and literature have only marginally been included in German classes, even though Afro-Germans have been a part of Germany for centuries and have undergone efforts at…

  1. Pakistan's rise to nuclear power and the contribution of German companies

    International Nuclear Information System (INIS)

    Ricke, Klaus-Peter

    2013-01-01

    The amendment of the Foreign Trade and Payments Act (Aussenwirtschaftsgesetz) has prompted the preparation of this paper because of concerns over potential setbacks in advances achieved over the past twenty years in regulating German exports to non-EU countries and shipments to member states of the EU and the watering down of export restrictions to correspond to the low standards in place at the EU level (with the objective of streamlining the Foreign Trade and Payments Act and nullifying special German requirements which place German exporters at a disadvantage compared with their European competitors, according to a spokesperson of the German Federal Ministry of Economics and Technology). This would send the wrong signal on combating proliferation. From the 1970s to 1990s the Federal Republic of Germany played an extremely negative role because it opened the doors wide to the proliferation of weapons of mass destruction through lax legislation and even more slipshod enforcement. Alarmed by several scandals, in recent years the German government has taken the lead regarding this issue and it would be appropriate for it to continue to fulfill this role. The attitude of the German governments in the 1970s to 1990s as well as the attitude of the key government authorities responsible for controlling exports becomes clear through the example of the cases of illegal exports of nuclear technology to Pakistan. Until the early 1990s the legal situation was such that some acts of proliferation could not even be prosecuted because the licensing regime included only goods listed in Part 1 of the Export Control List (Ausfuhrliste Teil I). The relevant authorities - the Bundesamt fuer Wirtschaft (Federal Office of Economics, BAW) and customs authorities - were neither in terms of personnel nor due to the deficiency of their computer equipment - in a position to carry out their legally prescribed duties. The maximum sentence for even the most serious proliferation violations

  2. POWER-GEN '90 conference papers: Volume 3 (Environmental trends and issues) and Volume 4 (Case histories - Non-utility power generation)

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    This is book 2 of a collection of papers presented at the Third International Power Generation Industries Conference on December 4-6, 1990. The book contains Volume 3, Environmental Trends and Issues, and Volume 4, Case Histories - Non-utility Power Generation. The topics of the papers include environmental legislative and regulatory trends, acid rain compliance strategies and technologies, other global environmental concerns, gas fired systems, solid and waste fuels, despatching and wheeling, and strategies for purchasing non-utility power

  3. A RE-ASSESSMENT OF THE GERMAN ARMAMENTS ...

    African Journals Online (AJOL)

    Steenkamp Fonseca R

    The German armaments production during World War II (1939-1945) is a ... assistance of captured material and industrial power of occupied Europe) but failed .... designs (types) of trucks decreased from 151 in 1939 to 23 in 1942; and of.

  4. Power Oscillation Damping Controller for Wind Power Plant Utilizing Wind Turbine Inertia as Energy Storage

    DEFF Research Database (Denmark)

    Knüppel, Thyge; Nielsen, Jørgen Nygård; Jensen, Kim Høj

    2011-01-01

    For a wind power plant (WPP) the upper limit for active power output is bounded by the instantaneous wind conditions and therefore a WPP must curtail its power output when system services with active power are delivered. Here, a power oscillation damping controller (POD) for WPPs is presented...... that utilizes the stored kinetic energy in the wind turbine (WT) mechanical system as energy storage from which damping power can be exchanged. This eliminates the need for curtailed active power production. Results are presented using modal analysis and induced torque coefficients (ITC) to depict the torques...... induced on the synchronous generators from the POD. These are supplemented with nonlinear time domain simulations with and without an auxiliary POD for the WPP. The work is based on a nonlinear, dynamic model of the 3.6 MW Siemens Wind Power wind turbine....

  5. DEWEK '98: 4. German wind power conference; DEWEK '98: 4. Deutsche Windenergie-Konferenz. Tagungsband

    Energy Technology Data Exchange (ETDEWEB)

    Gerdes, B. [ed.

    1999-07-01

    The conference report comprises 90 papers and posters on the following subjects: 1. Technological developments (e.g. use of adaptive structures systems, active stalle wind power systems, systems for early detection of errors); 2. Design and optimisation; 3. Wind forecasts; 4. Operation analyses (e.g. active and passive stall, collective loads, wind power systems in cold climates); 5. Wind power systems and the environment; 6. Offshore wind power generation; 7. Electric characteristics (e.g. modelling of flicker, energy conditioning in distribution systems with a high wind power share); 8. Economic efficiency (e.g. economic efficiency of offshore wind parks on the North Sea coast); 9. Network quality; 10. Rotor development (e.g. noise reduction); 11. Certification and methods of measurement. [German] Der Tagungsband enhaelt 90 Fach- und Posterbeitraege, die sich mit den folgenden Schwerpunkten befassen: 1. Technologische Entwicklungen (z.B. Einsatz von adaptiven Struktursystemen; Active-Stall-WKA; Fehlerfrueherkennungssystemen). 2. Auslegung und Optimierung. 3. Windprognosen. 4. Betriebsanalysen (z.B. Aktive Stall/Passive Stall im Vergleich; Lastkollektive von WKA; WKA in kaltem Klima). 5. Windenergieanlagen und Umwelt. 6. Offshore-Windenergienutzung. 7. Elektrische Eigenschaften (z.B. Modellierung des 'Flickerverhaltens' von WKA; Energiekonditionierung in Verteilnetzen mit hohem Windenergieanteil). 8. Wirtschaftlichkeit (z.B. Wirtschaftlichkeit von Offshore-Windparks der Norddeutschen Kuestenlinie). 9. Netzqualitaet. 10. Rotorentwicklung (z.B. Reduzierung der Schallabstrahlung von WKAs). 11. Zertifizierung von Messmethoden. (AKF)

  6. Comparison and lessons learned from plant specific PSA of German NPP

    International Nuclear Information System (INIS)

    Balfanz, Hans-Peter; Berg, H.P.

    2000-01-01

    PSA are launched in frame of Periodic Safety Reviews (PSR) in Germany. The aims are to identify overall safety level and relative weak points. Some backfitting measures have been realized for older plants to remove relative weak points and to bring these plants to the state of the art. In this field PSA is well accepted today and is seen as a valuable tool supplementing the deterministic analysis. Main application of PSA within PSR is planned to become mandatory as part of the revision of the German Atomic Energy Act. According to the German PSA Guideline plant specific PSA level 1+ were performed for all 19 In comparison with international practice German PSA are very detailed. Otherwise they do not handle all external events, non-power states and accident management measures as discussed before. The New PSA guideline will cover these aspects and therefore analysts have to take them into account in further PSA. Moreover gathering of plant specific data is needed. The development in this field is driven by the utilities (for instance in frame of their so-called ZEDB project). Public discussion about quantitative risk of industrial hazards is quite limited in Germany and PSA results have only few impacts to this respect. Independent from this PSA for NPP is understood as a diverse tool in supporting the deterministic licensing and supervision process. Risk based decision making as well as informed regulation are just only of the beginning. State of PSA of NPP in Germany, comparison of PSA result of different NPP, German PSA guideline and state of discussion of further development and recommendation of further development of PSA of NPP are discussed in this paper in more detail. (S.Y.)

  7. Comparison and lessons learned from plant specific PSA of German NPP

    Energy Technology Data Exchange (ETDEWEB)

    Balfanz, Hans-Peter [TUEV Nord, Hamburg (Germany); Berg, H.P.

    2000-07-01

    PSA are launched in frame of Periodic Safety Reviews (PSR) in Germany. The aims are to identify overall safety level and relative weak points. Some backfitting measures have been realized for older plants to remove relative weak points and to bring these plants to the state of the art. In this field PSA is well accepted today and is seen as a valuable tool supplementing the deterministic analysis. Main application of PSA within PSR is planned to become mandatory as part of the revision of the German Atomic Energy Act. According to the German PSA Guideline plant specific PSA level 1+ were performed for all 19 In comparison with international practice German PSA are very detailed. Otherwise they do not handle all external events, non-power states and accident management measures as discussed before. The New PSA guideline will cover these aspects and therefore analysts have to take them into account in further PSA. Moreover gathering of plant specific data is needed. The development in this field is driven by the utilities (for instance in frame of their so-called ZEDB project). Public discussion about quantitative risk of industrial hazards is quite limited in Germany and PSA results have only few impacts to this respect. Independent from this PSA for NPP is understood as a diverse tool in supporting the deterministic licensing and supervision process. Risk based decision making as well as informed regulation are just only of the beginning. State of PSA of NPP in Germany, comparison of PSA result of different NPP, German PSA guideline and state of discussion of further development and recommendation of further development of PSA of NPP are discussed in this paper in more detail. (S.Y.)

  8. An agent-based analysis of the German electricity market with transmission capacity constraints

    International Nuclear Information System (INIS)

    Veit, Daniel J.; Weidlich, Anke; Krafft, Jacob A.

    2009-01-01

    While some agent-based models have been developed for analyzing the German electricity market, there has been little research done on the emerging issue of intra-German congestion and its effects on the bidding behavior of generator agents. Yet, studies of other markets have shown that transmission grid constraints considerably affect strategic behavior in electricity markets. In this paper, the implications of transmission constraints on power markets are analyzed for the case of Germany. Market splitting is applied in the case of congestion in the grid. For this purpose, the agent-based modeling of electricity systems (AMES) market package developed by Sun and Tesfatsion is modified to fit the German context, including a detailed representation of the German high-voltage grid and its interconnections. Implications of transmission constraints on prices and social welfare are analyzed for scenarios that include strategic behavior of market participants and high wind power generation. It can be shown that strategic behavior and transmission constraints are inter-related and may pose severe problems in the future German electricity market.

  9. An agent-based analysis of the German electricity market with transmission capacity constraints

    Energy Technology Data Exchange (ETDEWEB)

    Veit, Daniel J.; Weidlich, Anke; Krafft, Jacob A. [University of Mannheim, Dieter Schwarz Chair of Business Administration, E-Business and E-Government, 68131 Mannheim (Germany)

    2009-10-15

    While some agent-based models have been developed for analyzing the German electricity market, there has been little research done on the emerging issue of intra-German congestion and its effects on the bidding behavior of generator agents. Yet, studies of other markets have shown that transmission grid constraints considerably affect strategic behavior in electricity markets. In this paper, the implications of transmission constraints on power markets are analyzed for the case of Germany. Market splitting is applied in the case of congestion in the grid. For this purpose, the agent-based modeling of electricity systems (AMES) market package developed by Sun and Tesfatsion is modified to fit the German context, including a detailed representation of the German high-voltage grid and its interconnections. Implications of transmission constraints on prices and social welfare are analyzed for scenarios that include strategic behavior of market participants and high wind power generation. It can be shown that strategic behavior and transmission constraints are inter-related and may pose severe problems in the future German electricity market. (author)

  10. Marlene Dietrich in the German Classroom: A German Film Project--Humanities through the Golden Age of German Cinema.

    Science.gov (United States)

    Flippo, Hyde

    1993-01-01

    Marlene Dietrich and other classic performers of German cinema can serve to open up a whole new realm for students of German, at secondary and postsecondary levels. By researching and viewing German and American film classics, students have opportunity to learn more about German language and an important element of German culture that has had…

  11. Applications of supercomputing and the utility industry: Calculation of power transfer capabilities

    International Nuclear Information System (INIS)

    Jensen, D.D.; Behling, S.R.; Betancourt, R.

    1990-01-01

    Numerical models and iterative simulation using supercomputers can furnish cost-effective answers to utility industry problems that are all but intractable using conventional computing equipment. An example of the use of supercomputers by the utility industry is the determination of power transfer capability limits for power transmission systems. This work has the goal of markedly reducing the run time of transient stability codes used to determine power distributions following major system disturbances. To date, run times of several hours on a conventional computer have been reduced to several minutes on state-of-the-art supercomputers, with further improvements anticipated to reduce run times to less than a minute. In spite of the potential advantages of supercomputers, few utilities have sufficient need for a dedicated in-house supercomputing capability. This problem is resolved using a supercomputer center serving a geographically distributed user base coupled via high speed communication networks

  12. Basic principles and results of the German risk study

    International Nuclear Information System (INIS)

    Heuser, F.W.; Bayer, A.

    1980-01-01

    In June 1976 the Federal Ministry for Research and Technology had commissioned the Gesellschaft fuer Reaktorsicherheit to write the German Risk Study, the first part of which has now been completed after three years of work and has been publicized recently. The German Risk Study is an attempt to define the societal risk posed by accidents in nuclear power plants under conditions in Germany. For this purpose, the accident rates and the resultant health hazards were determined. By adopting most of the basic premises and methods of the American Rasmussen Study, the German study is to allow a comparison to be made with the results of that study. The calculations were based on 19 sites with a total of 25 nuclear generating units presently in operation, under construction or in the licensing procedure in the Federal Republic of Germany. The technical studies were conducted on a 1300 MW PWR as the representative example. The results show that the decisive contributions are made by uncontrolled minor loss-of-coolant accidents and by failures of power supply (emergency power case). Large loss-of-coolant accidents do not play a role. The study also shows the decisive safety function of the containment. (orig.) [de

  13. Statistical inquiry on the reliability of emergency diesel stations in German nuclear power plants

    International Nuclear Information System (INIS)

    1983-01-01

    This statistic inquiry is based on 692 occurrances in 40 diesel stations of 10 German nuclear power plants. Various parameters influencing the failure behaviour of diesel stations were investigated on only significant plant-specific influences and the impact of diesel station circuitry on failure behaviour were established. According to the results of this inquiry, running time, start-up number and increasing operational experience do not apparently influence the failure behaviour of diesel stations. The expected failure probability of diesel stations varies with the different nuclear power plants. Taking into account both start-up and operational failures, (with monthly inspections and running times of up to 2 h), this value is in the range of 1.6 x 10 -2 to 1.7 x 10 -3 per application. Considering failure data of all diesel stations, the failure probability (start-up and operational failures) is 8.1 x 10 -3 per application. On account of the two common-mode failures registered, a common-mode failure probability of 10 -3 was established. The inquiry also showed that non-availability of diesel stations is essentially determined by maintenance intervals. (orig.) [de

  14. The relationship among CPU utilization, temperature, and thermal power for waste heat utilization

    International Nuclear Information System (INIS)

    Haywood, Anna M.; Sherbeck, Jon; Phelan, Patrick; Varsamopoulos, Georgios; Gupta, Sandeep K.S.

    2015-01-01

    Highlights: • This work graphs a triad relationship among CPU utilization, temperature and power. • Using a custom-built cold plate, we were able capture CPU-generated high quality heat. • The work undertakes a radical approach using mineral oil to directly cool CPUs. • We found that it is possible to use CPU waste energy to power an absorption chiller. - Abstract: This work addresses significant datacenter issues of growth in numbers of computer servers and subsequent electricity expenditure by proposing, analyzing and testing a unique idea of recycling the highest quality waste heat generated by datacenter servers. The aim was to provide a renewable and sustainable energy source for use in cooling the datacenter. The work incorporates novel approaches in waste heat usage, graphing CPU temperature, power and utilization simultaneously, and a mineral oil experimental design and implementation. The work presented investigates and illustrates the quantity and quality of heat that can be captured from a variably tasked liquid-cooled microprocessor on a datacenter server blade. It undertakes a radical approach using mineral oil. The trials examine the feasibility of using the thermal energy from a CPU to drive a cooling process. Results indicate that 123 servers encapsulated in mineral oil can power a 10-ton chiller with a design point of 50.2 kW th . Compared with water-cooling experiments, the mineral oil experiment mitigated the temperature drop between the heat source and discharge line by up to 81%. In addition, due to this reduction in temperature drop, the heat quality in the oil discharge line was up to 12.3 °C higher on average than for water-cooled experiments. Furthermore, mineral oil cooling holds the potential to eliminate the 50% cooling expenditure which initially motivated this project

  15. Utility-Scale Concentrating Solar Power and Photovoltaic Projects: A Technology and Market Overview

    Energy Technology Data Exchange (ETDEWEB)

    Mendelsohn, M.; Lowder, T.; Canavan, B.

    2012-04-01

    Over the last several years, solar energy technologies have been, or are in the process of being, deployed at unprecedented levels. A critical recent development, resulting from the massive scale of projects in progress or recently completed, is having the power sold directly to electric utilities. Such 'utility-scale' systems offer the opportunity to deploy solar technologies far faster than the traditional 'behind-the-meter' projects designed to offset retail load. Moreover, these systems have employed significant economies of scale during construction and operation, attracting financial capital, which in turn can reduce the delivered cost of power. This report is a summary of the current U.S. utility-scale solar state-of-the-market and development pipeline. Utility-scale solar energy systems are generally categorized as one of two basic designs: concentrating solar power (CSP) and photovoltaic (PV). CSP systems can be further delineated into four commercially available technologies: parabolic trough, central receiver (CR), parabolic dish, and linear Fresnel reflector. CSP systems can also be categorized as hybrid, which combine a solar-based system (generally parabolic trough, CR, or linear Fresnel) and a fossil fuel energy system to produce electric power or steam.

  16. Intelligibility of Standard German and Low German to Speakers of Dutch

    NARCIS (Netherlands)

    Gooskens, C.S.; Kürschner, Sebastian; van Bezooijen, R.

    2011-01-01

    This paper reports on the intelligibility of spoken Low German and Standard German for speakers of Dutch. Two aspects are considered. First, the relative potential for intelligibility of the Low German variety of Bremen and the High German variety of Modern Standard German for speakers of Dutch is

  17. Energy efficiency. Care with power. Protecting the environment actively; E wie Energieeffizienz. Mit Strom bewusst umgehen. Die Umwelt aktiv schuetzen

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-01-15

    This manual gives practical advice and informs about legal regulations, financial incentives and low-cost energy conservation techniques, assembled by power suppliers. Everybody is able to save energy in his own household and utilize it meaningfully without emissions: One buys energy saving appliances, heats carefully his rooms, houses and flats are insulated according to EnEV (German energy saving ordinance). Furtheron advices are given for ovens, refrigerators etc. not only to utilize power carefully as also to save money and to protect simultaneously the environment. (GL)

  18. Enhancing the utilization of photovoltaic power generation by superconductive magnetic energy storage

    International Nuclear Information System (INIS)

    Tam, K.S.; Kumar, P.; Foreman, M.

    1989-01-01

    This paper demonstrates that a superconductive magnetic energy storage (SMES) system can enhance large scale utilization of PV generation. With SMES support, power generated from PV arrays van be fully utilized under different weather conditions and PV penetrations can be increased to significant levels without causing adverse effects to the power system. Coupled with PV generation, a SMES system is even more effective in performing diurnal load leveling. A coordinated PV/SMES operation scheme is proposed and demonstrated under different weather conditions

  19. Utilization of Flexible Demand in a Virtual Power Plant Set-Up

    DEFF Research Database (Denmark)

    Thavlov, Anders; Bindner, Henrik W.

    2014-01-01

    High penetration levels from renewable energy sources in large-scale power systems demand a high degree of flexibility in the transmission and distribution system. This paper presents a method for utilization of flexible demand in the low-voltage distribution system using the thermal mass...... of a building to defer power consumption from electric space heating. The power consumption for heating is controlled by an operational virtual power plant, which is sending a set point for requested power consumption to the building management system. An optimization problem is formulated...

  20. Preservation of competence and cooperation with universities. Initiatives of German nuclear power plant operators to further know-how and competence preservation

    International Nuclear Information System (INIS)

    Seidel, Andre; Mohrbach, Ludger

    2009-01-01

    Nuclear power plants and nuclear technology offer graduates of technical and scientific university disciplines ambitious challenges in an attractive working environment. Irrespective of the politically motivated opt-out of the peaceful use of nuclear power in Germany, nuclear industry will continue to need motivated and committed young scientists and engineers for the next few decades. They contribute to the success of nuclear power plant operators, manufacturers, and consulting institutions. German nuclear power plant operators promote institutions of learning and research focusing on nuclear topics by means of a coordinated initiative. In this way, they contribute to preserving competence, attracting young scientists and engineers, and expanding research and development in Germany beyond the confines of specific topics. VGB PowerTech e.V. (VGB) supports operators in organizing these activities also by establishing subject-related working parties as a platform for exchanging information and harmonizing specific measures. (orig.)

  1. Mid-point review of the German energy transition

    International Nuclear Information System (INIS)

    Lauer, H.; Safa, H.; Guidez, J.

    2017-01-01

    The result of the 2015 review of the German energy transition is lukewarm. First: generating 20 % of the electricity production through wind power and solar energy appears to be very costly in Germany. Secondly there is practically no effect on the reduction of CO_2 releases as coal has been re-introduced to play the role of nuclear energy which was carbon-free to counter-balance the intermittency of renewable energies. Thirdly a necessity to keep all thermal plants ready to operate in order to cope with the intermittency of renewable energies as no adequate means of energy storage is available, appears to be a luxury that only Germany can afford. And fourthly, the cost of electric power for households and small enterprises is all the higher as the government economic policy is to spare German electro-intensive industry. One of the side effects of the German energy transition policy is to disturb the European market of electricity when favourable climate conditions make green electricity very abundant. In this situation electricity prices drop sharply and can even become negative while green electricity is always paid to the producer at a steady price guaranteed by the state. (A.C.)

  2. Is the east-west power bridge economic?

    International Nuclear Information System (INIS)

    Anon.

    1996-01-01

    At the latest conference of the East-West Energy Bridge project in Warsaw on October 24-25, 1995, the majority opinion concluded that the vast trans-European hvdc network proposed for operation in 2010 could be economically financed and operated in spite of reservations by some German utilities. Anatoliy Dyakov, president of the Russian UPS (Unified Power System), recently said that Russia would shortly start building the line from Smolensk to Kaliningrad as the first stage of this project. (author)

  3. Utilization of water power in the Hochsauerland District. Possibilities of utilizing water power plants while deriving profits for tourism. Wasserkraftnutzung im Hochsauerlandkreis. Moeglichkeiten zur Inwertsetzung der Wasserkraftanlagen im Rahmen einer touristischen Route

    Energy Technology Data Exchange (ETDEWEB)

    Peyrer, U.

    1994-01-01

    The idea of utilizing water power plants while driving profits for tourism intends to promote regional tourism and support the district at the same time. Since both precipitation and discharge conditions and the Hochsauerland relief provide favorable conditions for water power utilization, one finds various water wheel uses, i.e. corn mills or saw mills, water wheels for the metal-working industry, and hammer mills. This volume contains a comprehensive documentation of the water power plants in the Hochsauerland District. (BWI)

  4. High degree utilization of computers for design of nuclear power plants

    International Nuclear Information System (INIS)

    Masui, Takao; Sawada, Takashi

    1992-01-01

    Nuclear power plants are the huge technology in which various technologies are compounded, and the high safety is demanded. Therefore, in the design of nuclear power plants, it is necessary to carry out the design by sufficiently grasping the behavior of the plants, and to confirm the safety by carrying out the accurate design evaluation supposing the various operational conditions, and as the indispensable tool for these analysis and evaluation, the most advanced computers in that age have been utilized. As to the utilization for the design, there are the fields of design, analysis and evaluation and another fields of the application to the support of design. Also in the field of the application to operation control, computers are utilized. The utilization of computers for the core design, hydrothermal design, core structure design, safety analysis and structural analysis of PWR plants, and for the nuclear design, safety analysis and heat flow analysis of FBR plants, the application to the support of design and the application to operation control are explained. (K.I.)

  5. Revitalization of ethnic identity among the Germans in Sremski Karlovci

    Directory of Open Access Journals (Sweden)

    Krel Aleksandar

    2009-01-01

    Full Text Available During the 1990's, many members of the German national minority have awaken from the several decades long sleep in 'ethnic hibernation'. Several associations have been founded at that time, with an aim to gather and encourage ethnic feelings of the Germans living in Vojvodina. These associations work toward revitalization and reconstruction of the German ethnic and cultural identity. There are quite a few of such institutions today, and one of them is German association promoting good neighbor relations Karlowitz, Sremski Karlovci. This paper will discuss transformation of an ethnic identity strategy among the Germans in Sremski Karlovci; in addition, I will analyze modus operandi by which this local association aims at keeping and encouraging certain elements of the ethnic and cultural particulars. The results of the research point out how a relatively small group, without social power, can define and redefine its own identity, in regards to historical, social and economic conditions.

  6. Experience with vibration monitoring in German PWRs Obrigheim, Grohnde, Brokdorf and Emsland

    International Nuclear Information System (INIS)

    Stegemann, D.; Runkel, J.

    1996-01-01

    Without any interference to the normal operation of a nuclear power plant useful informations about the vibrational behaviour and the operation conditions in the primary circuit can be obtained by noise analysis of the signals of the standard reactor instrumentation. The purpose is to detect incipient changes of mechanical and operating conditions in order to enable early failure detection and preventive maintenance. This contributes not only to the safety but also to higher availability and economic efficiency of the plant. Routine measurements and noise analysis of the signals of the reactor and primary loop instrumentation are performed in all German nuclear power plants with pressurized water reactor. This paper deals with experiences of vibration monitoring by use of noise analysis ion four utilities. The typical vibration behaviour of reactor components of the different PWRs is compared and the particular vibration behaviour of a core support flow distribution stool, of a steam generator and a main circulation pump shaft is discussed. (authors)

  7. Abbreviations of nuclear power plant engineering

    International Nuclear Information System (INIS)

    Freyberger, G.H.

    1979-01-01

    The edition of this English and German list of abbreviations comprises about 5200 entries in English and about 1400 entries in German as well as the most important American, English, German and other foreign Utilities and component manufacturers frequently quoted in nuclear engineering literature and documentation. (orig./HP) [de

  8. Application of the accident consequences model of the German risk study to assessments of accident risks in different types of nuclear power plants

    International Nuclear Information System (INIS)

    Ehrhardt, J.; Bayer, A.

    1982-01-01

    Within the scope of the 'German Risk Study for Nuclear Power Plants' (Phase A) the accident consequence model UFOMOD was developed in the Karlsruhe Nuclear Research Center. This model originally developed for pressurized water reactors has now been extended in order to obtain results about accidental releases of activity from fast breeder and high-temperature reactors, too. (RW) [de

  9. The history of the construction und operation of the KNK II German Fast Breeder Power Plant

    International Nuclear Information System (INIS)

    Marth, W.

    1993-08-01

    This report describes the German KNK fast breeder project from its beginnings in 1957 until permanent shutdown in 1991. The initial design provided for a sodium-cooled, but thermal reactor. Already during the commissioning of KNK I on the premises of the Karlsruhe Nuclear Research Center modification into a fast nuclear power plant was decided. Considerable difficulties in licensing had to be overcome. KNK II reached high burnup values in the fuel elements and closing of the fuel cycle was achieved. A number of technical problems concerning individual components are described in detail. After the politically motivated discontinuation of the SNR 300 fast breeder project at Kalkar, KNK II was shut down for good in August 1991. (orig.) [de

  10. The History of the Construction and Operation of the German KNK II Fast Breeder Power Plant

    International Nuclear Information System (INIS)

    Marth, W.

    1994-11-01

    The report gives a historical review of the German KNK fast breeder project, from its beginnings in 1957 up to permanent plant shutdown in 1991. The original design was for the sodium cooled thermal reactor KNK I, which was commissioned on the premises of the Karlsruhe Nuclear Research Center. The conversion into a fast nuclear power plant however was a process, which had to overcome considerable licensing difficulties. KNK II attained high fuel element burnups, and the completion of the fuel cycle was achieved. Various technical problems encountered in specific components are described in detail. After the termination of the SNR 300 fast breeder project in Kalkar for political reasons, KNK II was shutdown in August 1991

  11. A Nodal Pricing Analysis of the Future German Electricity Market

    International Nuclear Information System (INIS)

    Ozdemir, O.; Hers, J.S.; Bartholomew Fisher, E.; Brunekreeft, G.; Hobbs, B.F.

    2009-05-01

    The electricity market in Germany is likely to undergo several significant structural changes over the years to come. Here one may think of Germany's ambitious renewable agenda, the disputed decommissioning of nuclear facilities, but also unbundling of TSO's as enforced by European regulation. This study is a scenario-based analysis of the impact of different realizations of known investment plans for transmission and generation capacity on the future German power market while accounting for internal congestion. For this analysis the static equilibrium model of the European electricity market COMPETES is deployed, including a 10-node representation of the German highvoltage grid. Results for the multi-node analysis indicate that price divergence and congestion are likely to arise in the German market as renewable additions affecting mainly the North of Germany, the debated decommissioning of nuclear facilities in the South, and the expected decommissioning of coal-fired facilities in Western Germany appear to render current investment plans for transmission capacity insufficient. The current system of singlezone pricing for the German market may therewith be compromised. However, transmission additions would not benefit all market parties, with producers in exporting regions and consumers in importing regions being the main beneficiaries. Vertical unbundling of German power companies could increase the incentive for constructing transmission lines if generation capacity would cause Germany to be a net-importing country. In case Germany remains a net-exporting country, the effects of vertical unbundling on cross-border capacity are less clear cut.

  12. The Research of Utilization Hours of Coal-Fired Power Generation Units Based on Electric Energy Balance

    Science.gov (United States)

    Liu, Junhui; Yang, Jianlian; Wang, Jiangbo; Yang, Meng; Tian, Chunzheng; He, Xinhui

    2018-01-01

    With grid-connected scale of clean energy such as wind power and photovoltaic power expanding rapidly and cross-province transmission scale being bigger, utilization hours of coal-fired power generation units become lower and lower in the context of the current slowdown in electricity demand. This paper analyzes the influencing factors from the three aspects of demand, supply and supply and demand balance, and the mathematical model has been constructed based on the electric energy balance. The utilization hours of coal-fired power generation units have been solved considering the relationship among proportion of various types of power installed capacity, the output rate and utilization hours. By carrying out empirical research in Henan Province, the utilization hours of coal-fired units of Henan Province in 2020 has been achieved. The example validates the practicability and the rationality of the model, which can provide a basis for the decision-making for coal-fired power generation enterprises.

  13. The licensing procedure for the construction of power utilities

    International Nuclear Information System (INIS)

    Sturm, C.

    1987-01-01

    The requirement to obtain licences for plants constitutes a form of state control over the construction of power utilities. Under the Federal Pollution Law and the Atomic Energy Law, only the environmental compatibility of the planned plant is verified. Verifications according to the Law on the Fuel and Electricity Industries and the Federal Pollution Law, respectively the Atomic Energy Law and the Law on Power Generation from Coal are effected independently of one another by the different authorities. The granting of licences for the individual power plants may be subject to different laws in each instance. This paper covers only the licensing procedure under the Federal Pollution Law and the Atomic Energy Law. (orig./HSCH) [de

  14. Ten-year study of municipal utilities. Review and forecast. Cooperations are getting ever more important; Zehn Jahre Stadtwerkestudie. Ein Rueck- und Ausblick. Kooperationen werden noch wichtiger

    Energy Technology Data Exchange (ETDEWEB)

    Edelmann, Helmut [Ernst und Young GmbH Wirtschaftspruefungsgesellschaft, Duesseldorf (Germany)

    2012-08-20

    Since 2003 Ernst and Young, in cooperation with the BDEW (Bundesverband der Energie- und Wasserwirtschaft e.V., German Association of Energy and Water Utilities), have been carrying out annual enquiries among leading managers of municipal and regional utilities in Germany. The focus is on current issues of the power supply sector and the economic situation of the organizations under investigation. This contribution presents a review and a look into the future.

  15. German Atomic Energy Act turns fifty

    International Nuclear Information System (INIS)

    Schneider, Horst

    2009-01-01

    The German Atomic Energy Act entered into force on January 1, 1960. It turns fifty at the beginning of 2010. Is this a reason to celebrate or rather the opposite? Lawyers, in principle, can view old pieces of legislation from 2 perspectives: On the one hand, aged laws are treated in a spirit of veneration and are celebrated as proven. On the other hand, an anniversary of this kind can be a welcome reason for demands to abolish or, at least, fundamentally renew that law. Over the past half century, the German Atomic Energy Act went through stormy and varied phases both of a legal and a political character. Its 50 th anniversary is likely to spark off very conflicting evaluations as well. A review of legal history shows that the German or, rather, the Federal German Atomic Energy Act (AtG) was not a first-of-its-kind piece of legislation but stemmed from the 1957 EURATOM Treaty, in a way representing a latecomer of that treaty. The Atomic Energy Act experienced a number of important developments throughout its history: - In 1975, compulsory licensing of fuel element factories was introduced. - The back end of the fuel cycle, especially final storage, were incorporated in the Atomic Energy Act comprehensively first in 1976. - In 1985, legislators decided in favor of unlimited nuclear liability. - In 1994 and 1998, only some innovations in special items were introduced under the headings of environmental impact assessment and suitability for repository storage because the controversy about nuclear power did not permit a fundamental alignment towards a more comprehensive modern safety law. - The decision to opt out of the peaceful uses of nuclear power in 2002 drew the final line so far of decisions about directions of nuclear law in a major amendment. In parallel, the decisions by the Federal Constitutional Court and the Federal Administrative Court in the late 1970s and, above all, the 1980s provided important assistance which has remained valid to this day. What is

  16. German neutron scattering conference. Programme and abstracts

    Energy Technology Data Exchange (ETDEWEB)

    Brueckel, Thomas (ed.)

    2012-07-01

    The German Neutron Scattering Conference 2012 - Deutsche Neutronenstreutagung DN 2012 offers a forum for the presentation and critical discussion of recent results obtained with neutron scattering and complementary techniques. The meeting is organized on behalf of the German Committee for Research with Neutrons - Komitee Forschung mit Neutronen KFN - by the Juelich Centre for Neutron Science JCNS of Forschungszentrum Juelich GmbH. In between the large European and international neutron scattering conferences ECNS (2011 in Prague) and ICNS (2013 in Edinburgh), it offers the vibrant German and international neutron community an opportunity to debate topical issues in a stimulating atmosphere. Originating from ''BMBF Verbundtreffen'' - meetings for projects funded by the German Federal Ministry of Education and Research - this conference series has a strong tradition of providing a forum for the discussion of collaborative research projects and future developments in the field of research with neutrons in general. Neutron scattering, by its very nature, is used as a powerful probe in many different disciplines and areas, from particle and condensed matter physics through to chemistry, biology, materials sciences, engineering sciences, right up to geology and cultural heritage; the German Neutron Scattering Conference thus provides a unique chance for exploring interdisciplinary research opportunities. It also serves as a showcase for recent method and instrument developments and to inform users of new advances at neutron facilities.

  17. German neutron scattering conference. Programme and abstracts

    International Nuclear Information System (INIS)

    Brueckel, Thomas

    2012-01-01

    The German Neutron Scattering Conference 2012 - Deutsche Neutronenstreutagung DN 2012 offers a forum for the presentation and critical discussion of recent results obtained with neutron scattering and complementary techniques. The meeting is organized on behalf of the German Committee for Research with Neutrons - Komitee Forschung mit Neutronen KFN - by the Juelich Centre for Neutron Science JCNS of Forschungszentrum Juelich GmbH. In between the large European and international neutron scattering conferences ECNS (2011 in Prague) and ICNS (2013 in Edinburgh), it offers the vibrant German and international neutron community an opportunity to debate topical issues in a stimulating atmosphere. Originating from ''BMBF Verbundtreffen'' - meetings for projects funded by the German Federal Ministry of Education and Research - this conference series has a strong tradition of providing a forum for the discussion of collaborative research projects and future developments in the field of research with neutrons in general. Neutron scattering, by its very nature, is used as a powerful probe in many different disciplines and areas, from particle and condensed matter physics through to chemistry, biology, materials sciences, engineering sciences, right up to geology and cultural heritage; the German Neutron Scattering Conference thus provides a unique chance for exploring interdisciplinary research opportunities. It also serves as a showcase for recent method and instrument developments and to inform users of new advances at neutron facilities.

  18. Descriptive statistics of occupational employment in nuclear power utilities. Final working paper

    International Nuclear Information System (INIS)

    Little, J.R.; Johnson, R.C.

    1982-10-01

    The Institute of Nuclear Power Operations conducted a survey of its 58 member utilities during the Spring of 1982. This was the second such survey performed to identify employment trends and to project needs for trained personnel in the industry to 1991. The first was performed in 1981. The 1982 employment survey consisted of four questionnaires, asking for information on: (1) on-site employment; (2) on-site turnover; (3) off-site employment; and (4) off-site turnover. The survey instruments were designed to reflect approaches used by the utilities to meet the labor requirements for operation of nuclear power plants through off-site support personnel, contractors, and holding company personnel, as well as utility employees working at the plant site. On-site information was received from all 83 plants at the 58 utilities. However, employment information from Surry of VEPCO arrived too late to be included in the analysis. Therefore, their numbers are reflected in the adjusted totals. Responses to requests for off-site employment information were received from 55 of the 58 utilities

  19. Evaluation of actual costs of power sources and effects on balance sheets of electric utilities

    International Nuclear Information System (INIS)

    Matsuo, Yuji; Yamaguchi, Yuji; Murakami, Tomoko

    2013-01-01

    After the Fukushima nuclear accident, almost all nuclear power stations continued to stop operation and sharp increase of purchase costs of fossil fuels forced some electric utilities to suffer a deficit. This article presented quantitative analysis of effects of present state on power costs and balance sheets of electric utilities. Levelized costs of electricity increased from 8.6 ¥/kWh (2010) to 11.6 ¥/kWh (2011) and 12.6 ¥/kWh (2012). Total power costs increased from 7.5 Trillion¥(2010) to 9.5 Trillion¥(2011). Due to increase of cost of fossil fuel compensated for nuclear power, electric utilities suffered a net loss of 0.8 Trillion¥ and decreased surplus to 2.5 Trillion¥ in 2011. Net loss of 1.3 Trillion¥ and surplus of 1.2 Trillion¥ was estimated for 2012. This state was beyond the limit of utilities' efforts to reduce costs and uncertain share of power sources became a great risk. Future share of power sources should be judged appropriately from various standpoints (costs, stable supply, energy security and national economic growth) and early public dissemination of new philosophy on share of power sources was highly required. (T. Tanaka)

  20. Supplier-independent fuel management from the viewpoint of a large German utility - Objectives and experience

    International Nuclear Information System (INIS)

    Kallmeyer, D.H.; Petersen, K.

    1986-01-01

    Internationally, many nuclear power operating utilities tend to have alternative fuel supplies and as a consequence also have to build up a supplier-independent fuel management. The main reasons are competition within the fuel assembly market as a price-regulating mechanism; quality comparison and corresponding improvements in fuel technology, documentation system and licensing support activities; improved necessity on the part of the manufacturer to be open for innovations; improved supply reliability by redundant manufacturer qualification; and gain of know-how for the utility by collection and comparison of the state of the art of the different suppliers in the important technical and physical disciplines

  1. On the present situation and future role of nuclear power

    International Nuclear Information System (INIS)

    1990-05-01

    The engaged public debate about the need for, and responsibility of, the continued use of nuclear power goes on unabated between the political parties and other groups of social relevance in the Federal Republic of Germany. And yet, some tentative changes seem to appear in the spectrum of opinions. In this situation, the German public utility companies operating nuclear power plants felt it necessary to express once more in a position paper their attitude with respect to nuclear power for the benefit of those bearing political responsibility at Federal and State Government level and the political parties. Their statements are guided by the responsibility the public utilities have for a reliable, sufficient, environmentally clean, and economic provision of electricity. They are convinced that nuclear power should remain a major constituent part of a comprehensive supply concept also in the future. This supply concept, which is based on the efficient use of power, relies on nuclear energy, run-of-river power, and lignite for the base load and on domestic hard coal for the medium load range; renewable energy sources are included. It underscores the social responsibility of the public utilities in ensuring electricity supply in a way which helps to conserve resources and is compatible with the environment. (orig.) [de

  2. The effect of the Fukushima nuclear accident on stock prices of electric power utilities in Japan

    International Nuclear Information System (INIS)

    Kawashima, Shingo; Takeda, Fumiko

    2012-01-01

    The purpose of this study is to investigate the effect of the accident at the Fukushima Daiichi nuclear power station, which is owned by Tokyo Electric Power Co. (TEPCO), on the stock prices of the other electric power utilities in Japan. Because the other utilities were not directly damaged by the Fukushima nuclear accident, their stock price responses should reflect the change in investor perceptions on risk and return associated with nuclear power generation. Our first finding is that the stock prices of utilities that own nuclear power plants declined more sharply after the accident than did the stock prices of other electric power utilities. In contrast, investors did not seem to care about the risk that may arise from the use of the same type of nuclear power reactors as those at the Fukushima Daiichi station. We also observe an increase of both systematic and total risks in the post-Fukushima period, indicating that negative market reactions are not merely caused by one-time losses but by structural changes in society and regulation that could increase the costs of operating a nuclear power plant.

  3. German risk study on nuclear power plants. Vol. 3

    International Nuclear Information System (INIS)

    Albertz, V.; Gueldner, W.; Hoemke, P.; Hoertner, H.; Lindauer, E.; Linden, J. von; Preischl, W.; Reichart, G.; Roehrs, W.

    1980-01-01

    This appendix discusses those studies which were carried out in phase A of the German Risk Study on the following problems: occurrence frequencies of initiating events, evaluation of the reactor pressure vessel, failure rates and failure probabilities for components, probabilities for human error. The appendix describes the general procedure used in determining these parameters. In addition, it gives the individual values used and the sources employed to determine these values. (orig.) [de

  4. Twenty years of experience in spent fuel shipment from German nuclear power plants - a view of the competent authority

    International Nuclear Information System (INIS)

    Fasten, Ch.; Mueller, U.; Alter, U.

    1994-01-01

    A survey of the transport of spent fuel in and from Germany during the last 20 years is presented. The spent fuel is now transported from the German nuclear power facilities to the reprocessing plants in France and the United Kingdom. In the past, there were also shipments to the former reprocessing plant WAK Karlsruhe (Germany), to the long-term storage facility CLAB (Sweden) and also from the former German Democratic Republic to the USSR. The transport of the spent fuel is carried out in specially built flasks requiring an extensive quality assurance programme. Due to the heavy weight of these packages, the shipments are mostly carried out by rail, but also by road and sea. An overview is given of the following matters: (i) quantities of spent fuel transport, (ii) organisation of transport (iii) licensing matters, and (iv) reported incidents. In addition, an analysis is included of the radiation exposure for normal conditions of transport, especially of the transport workers. Difficulties and hindrances during transport are also reported. (author)

  5. Nuclear power in Germany

    International Nuclear Information System (INIS)

    Schaefer, A.

    1990-01-01

    I want to give some ideas on the situation of public and utility acceptance of nuclear power in the Federal Republic of Germany and perhaps a little bit on Europe. Let me start with public perception. I think in Germany we have a general trend in the public perception of technology during the last decade that has been investigated in a systematic manner in a recent study. It is clear that the general acceptance of technology decreased substantially during the last twenty years. We can also observe during this time that aspects of the benefits of technology are much less reported in the media, that most reporting by the media now is related to the consequences of technologies, such as negative environmental consequences. hat development has led to a general opposition against new technological projects, in particular unusual and large. That trend is related not only to nuclear power, we see it also for new airports, trains, coal-fired plants. here is almost no new technological project in Germany where there is not very strong opposition against it, at least locally. What is the current public opinion concerning nuclear power? Nuclear power certainly received a big shock after Chernobyl, but actually, about two thirds of the German population wants to keep the operating plants running. Some people want to phase the plants out as they reach the end-of-life, some want to substitute newer nuclear technology, and a smaller part want to increase the use of nuclear power. But only a minority of the German public would really like to abandon nuclear energy

  6. Electric utility power plant construction costs, 1st Edition

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    New UDI report combines historical construction costs for more than 1,000 coal, oil, gas, nuclear and geothermal units that have entered commercial operation since 1966 and projected power plant construction costs for about 400 utility-owned generating units scheduled to enter commercial operation during the next 20 years. Key design characteristics and equipment suppliers, A/E, constructor and original installed cost data. Direct construction costs without AFUDC are provided where known. Historical construction cost data are also provided for about 130 utility-owned hydroelectric, gas turbine, combined-cycle and diesel units (these data are generally for units entering service after 1980)

  7. Argument about the climatological-meteorological data base of the German Risk Study on Nuclear Power Plants

    International Nuclear Information System (INIS)

    Kumm, H.

    1984-01-01

    The Ecological Institute's doubts about the representativeness of the climatological-meteorological data base of the German Risk Study concludes that this data base with its 115 'weather sequences' combined with 36 'wind directions' has no defined reference period. The complementary frequency distributions of the German Risk Study do not, therefore, represent statistically secured occurence frequencies for damage caused by accidents. Furthermore, incorrect values for the height of mixing layers used in the German Risk Study were found. (RF) [de

  8. Rising energy prices - so what? Autonomy in power supply by independent power generation. Proceedings; Steigende Energiepreise - na und? Unabhaengige Energieversorgung durch Energieerzeugung. Tagungsbeitraege

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    Impending energy shortage and distribution conflicts have stimulated the discussion concerning natural energy sources in Germany. The conflicts indicate the dependence of the German industry on imported raw materials. Supply shortages show the vulnerability of central supply structures. This conference, held by EnergieAgentur.NRW in cooperation with Technische Akademie Wuppertal (TAW) on 16 November 2006, addressed industrial organisations, communities and utilities in an attempt to show how organisations may become independent by constructing their own power plants, and in what cases such solutions are acceptable and economically useful. The conference focused on projects in the planning and production stage, e.g. an office building at Aachen, the Gelsenkirchen Marienhospital building, the common power station projected by several municipal utilities in the Ruhr region, and the 100 MW refuse-fuelled power station of Norddeutsche Affinerie AG Hamburg, which was presented by Dr. Werner Marnette, chairman of the board and managing director of Europe's biggest producer of copper. (orig.)

  9. Heisenberg's war. The secret history of the German bomb

    International Nuclear Information System (INIS)

    Powers, T.

    1993-01-01

    The history of Second World War Germany's 'Uranium Project', which often is referred to as the 'myth of the German atomic bomb', has been attracting the mind's of secret service men, futurologists, historians and journalists since after the end of the war it has become possible to lift the veil of secrecy. Powers book adds another one to the many investigations published since them. His approach to the piece of history starts with Heisenberg's visit to the U.S.A. in summer 1939, describes the plans of the German Heereswaffenamt pursued with the Uranium Project, and their counterpart on the side of the Allied Forces where German scientists, as immigrants in England and in the U.S.A., were doing their best to launch research for the development of an atomic bomb. The end of this 'competition' is marked by the internment of the ten German scientists and bomb specialists in Fall Hall. The leading story of the book centers on the small group of scientists around Heisenberg, who cleverly 'torpedoed' the development of the German atomic bomb in the years from 1939 until 1944. (HP) [de

  10. Major energy users and reforms of the German energy industry

    Energy Technology Data Exchange (ETDEWEB)

    Pfaffenberger, W

    1994-06-01

    There is a historic tradition of industrial autoproduction of electricity in Germany. Major energy users in the past used to be and today often still are autoproducers of electric power. The public utility sector, according to present legal standards, operates in a framework that protects local and regional monopolies. The large consumers and autoproducers are an important countervailing power in the whole system of the electricity supply industry. Electric utilities (EU) in Germany are semi-public or private enterprises of a wide variety of size. The large producer utilities operate the high voltage grid on the basis of private contracts. Regional distribution companies mostly without a considerable share in production often in cooperation with local distributors deliver electricity (el) in the non-urban areas whereas mostly city owned EU supply the large cities often on the basis of considerable parts of autoproduction and often also with a considerable share of el produced in cogeneration plants. The equilibrium between the parts of this system in the past was ensured by a legal framework protecting local monopolies as well as long term contracts between producers and distributors. Deregulation trends inherent in European legislation on competition have threatened this stability. In the first phase resistance against a more competitive order seemed unanimous. In the meantime however the different actors had time to rethink their position: The European Council has now proposed a more moderate regulation. The German Government has made a proposal for some important changes in the Energy Law and connected passages in the Competition Law, which would introduce some more competitive elements into the system without anticipating the results of a competitive process.

  11. Offshore wind power system in the Exclusive Economic Zone. Applicability of German property law; Offshore-Windenergieanlagen in der AWZ. Anwendbarkeit des deutschen Sachenrechts

    Energy Technology Data Exchange (ETDEWEB)

    Schulz, Thomas; Glaesner, Michael [Linklaters LLP, Berlin (Germany)

    2013-04-15

    The present article shows how a lack of regulation has led to a certain degree of legal uncertainty as to whether offshore wind power plants located in the German Exclusive Economic Zone are amenable to German property law. For practical purposes this has made it necessary to negotiate project contracts such that the transfer of ownership of individual components is effected while these are still on shore, even if the purchase price has yet to be fully paid. The financing banks have a policy in place of demanding the establishment of a subsidiary which is to receive ownership of the assets. This makes the structure of such contracts a great deal more complicated in terms of corporations law and tax law. The present article summarises the experiences gained by lawyers in these matters, giving an overview of the different legal positions taken on them to date. It shows that the applicability of German property law follows from the law now in force. Aside from this the authors advocate amendments to the relevant IPR norm as a means of reinforcing legal certainty in practice and make a concrete proposal for a clause to this end.

  12. Electric power bidding model for practical utility system

    Directory of Open Access Journals (Sweden)

    M. Prabavathi

    2018-03-01

    Full Text Available A competitive open market environment has been created due to the restructuring in the electricity market. In the new competitive market, mostly a centrally operated pool with a power exchange has been introduced to meet the offers from the competing suppliers with the bids of the customers. In such an open access environment, the formation of bidding strategy is one of the most challenging and important tasks for electricity participants to maximize their profit. To build bidding strategies for power suppliers and consumers in the restructured electricity market, a new mathematical framework is proposed in this paper. It is assumed that each participant submits several blocks of real power quantities along with their bidding prices. The effectiveness of the proposed method is tested on Indian Utility-62 bus system and IEEE-118 bus system. Keywords: Bidding strategy, Day ahead electricity market, Market clearing price, Market clearing volume, Block bid, Intermediate value theorem

  13. State of nuclear waste management of German nuclear power stations

    International Nuclear Information System (INIS)

    1983-01-01

    The waste management of nuclear power plants in the Federal Republic of Germany is today prevailing in the public discussion. Objections raised in this connection, e.g. that the nuclear waste management has been omitted from the development of peaceful utilization of nuclear energy or remained insolved, are frequently accepted without examination, and partly spread as facts. This is, however, not the truth: From the outset in 1955 the development of nuclear technology in the Federal Republic of Germany has included investigations of the problems of reprocessing and non-detrimental disposal of radioactive products, and the results have been compiled in a national nuclear waste management concept. (orig.) [de

  14. The Legacy of Nazism and the History Curriculum in the East German Secondary Schools.

    Science.gov (United States)

    Wegner, Gregory P.

    1992-01-01

    Examines the Marxist-Leninist curriculum assumptions about history instruction in East German schools on the legacy of Nazism. Suggests that questions raised to legitimize history instruction for East German students are relevant for students in capitalist countries. Discusses Hitler's rise to power, Soviet contributions to defeat fascism,…

  15. Expected Power-Utility Maximization Under Incomplete Information and with Cox-Process Observations

    International Nuclear Information System (INIS)

    Fujimoto, Kazufumi; Nagai, Hideo; Runggaldier, Wolfgang J.

    2013-01-01

    We consider the problem of maximization of expected terminal power utility (risk sensitive criterion). The underlying market model is a regime-switching diffusion model where the regime is determined by an unobservable factor process forming a finite state Markov process. The main novelty is due to the fact that prices are observed and the portfolio is rebalanced only at random times corresponding to a Cox process where the intensity is driven by the unobserved Markovian factor process as well. This leads to a more realistic modeling for many practical situations, like in markets with liquidity restrictions; on the other hand it considerably complicates the problem to the point that traditional methodologies cannot be directly applied. The approach presented here is specific to the power-utility. For log-utilities a different approach is presented in Fujimoto et al. (Preprint, 2012).

  16. Expected Power-Utility Maximization Under Incomplete Information and with Cox-Process Observations

    Energy Technology Data Exchange (ETDEWEB)

    Fujimoto, Kazufumi, E-mail: m_fuji@kvj.biglobe.ne.jp [Bank of Tokyo-Mitsubishi UFJ, Ltd., Corporate Risk Management Division (Japan); Nagai, Hideo, E-mail: nagai@sigmath.es.osaka-u.ac.jp [Osaka University, Division of Mathematical Science for Social Systems, Graduate School of Engineering Science (Japan); Runggaldier, Wolfgang J., E-mail: runggal@math.unipd.it [Universita di Padova, Dipartimento di Matematica Pura ed Applicata (Italy)

    2013-02-15

    We consider the problem of maximization of expected terminal power utility (risk sensitive criterion). The underlying market model is a regime-switching diffusion model where the regime is determined by an unobservable factor process forming a finite state Markov process. The main novelty is due to the fact that prices are observed and the portfolio is rebalanced only at random times corresponding to a Cox process where the intensity is driven by the unobserved Markovian factor process as well. This leads to a more realistic modeling for many practical situations, like in markets with liquidity restrictions; on the other hand it considerably complicates the problem to the point that traditional methodologies cannot be directly applied. The approach presented here is specific to the power-utility. For log-utilities a different approach is presented in Fujimoto et al. (Preprint, 2012).

  17. Rare earth germanates

    International Nuclear Information System (INIS)

    Bondar', I.A.; Vinogradova, N.V.; Dem'yanets, L.N.

    1983-01-01

    Rare earth germanates attract close attention both as an independent class of compounds and analogues of a widely spread class of natural and synthetic minerals. The methods of rare earth germanate synthesis (solid-phase, hydrothermal) are considered. Systems on the basis of germanium and rare earth oxides, phase diagrams, phase transformations are studied. Using different chemical analysese the processes of rare earth germanate formation are investigated. IR spectra of alkali and rare earth metal germanates are presented, their comparative analysis being carried out. Crystal structures of the compounds, lattice parameters are studied. Fields of possible application of rare earth germanates are shown

  18. Rare earth germanates

    International Nuclear Information System (INIS)

    Bondar', I.A.; Vinogradova, N.V.; Dem'yanets, L.N.

    1983-01-01

    From the viewpoint of structural chemistry and general regularities controlling formation reactions of compounds and phases in melts, solid and gaseous states, recent achievements in the chemistry of rare earth germanates are generalized. Methods of synthesizing germanates, systems on the base of germanium oxides and rare earths are considered. The data on crystallochemical characteristics are tabulated. Individual compounds of scandium germanate are also characterized. Processes of germanate formation using the data of IR-spectroscopy, X-ray phase analysis are studied. The structure and morphotropic series of rare earth germanates and silicates are determined. Fields of their present and possible future application are considered

  19. Renewable energy and CCS in German and European power sector decarbonization scenarios

    Energy Technology Data Exchange (ETDEWEB)

    Ludig, Sylvie

    2013-11-06

    system costs are lower when transmission and storage are available. Restrictions on transmission expansion induce high amounts of storage since high local shares of solar PV lead to large output variations. In contrast, a highly interconnected European power grid allows for optimized renewable power generation siting in regions with highest potentials, which requires large-scale transmission expansions but limits total power system costs. Results from a detailed study for Germany show that the level of power demand is strongly relevant for the realization of high renewable shares and ambitious decarbonization targets. A broad technology portfolio allows to hedge against the failure to meet efficiency goals for electricity demand. CCS is necessary to reach ambitious government targets if power demand is not sufficiently decreased by efficiency measures, as is offshore wind energy. Even in case of decreasing demand, at least one of both technologies needs to be available. The choice of transmission expansion corridors is strongly influenced by technology availability: in scenarios without offshore wind energy, north-south interconnections, which are crucial in all other scenarios, only play a minor role. The studies in this thesis show that a large-scale decarbonization of the German and European power sectors is achievable through large shares of renewable energy technologies for electricity generation. CCS is not a prerequisite for successful CO{sub 2} emission strategies, but allows reaching mitigation targets at a lower cost. A portfolio of renewable energy integration options is essential to manage temporal and spatial fluctuations; the optimal technology mix is determined by the underlying power system.

  20. The rise of smart customers. How consumer power will change the global power and utilities business. What consumers think

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-08-15

    Smart technology puts unprecedented power in the hands of consumers to manage and control their energy use. In time, this will fundamentally shift the balance of customer relations. It seems the era of a one-way relationship - where a utility delivers energy to domestic consumers, end of story - is over. Most power and utility businesses are currently treating the smart transition as an infrastructure upgrade, focusing chiefly on the technology and on fulfilling regulatory obligations. So far, the customer perspective and need for consumer education have not figured prominently in smart implementation programs. But following customer resistance to implementations in the US and Australia, the sector has been alerted to further challenges. Consumers' newfound power to say 'no' is one that the industry is not used to dealing with. Power and utility businesses must learn from the mistakes made so far. They need customer buy-in before they can exploit the host of new business opportunities that smart technology could provide. To explore the sector's readiness to respond to the present cycle of change, we asked domestic energy consumers how they viewed their relationship with energy providers. We wanted to know if they understood the benefits of smart metering, as well as their appetite for smart energy services.

  1. German atomic energy law in the international framework

    International Nuclear Information System (INIS)

    Pelzer, N.

    1992-01-01

    The regional conference was devoted to the legal problems that ensue from German reunification against the background of the integration of German atomic energy law within international law. The elements of national atomic energy legislation required by international law and recent developments in international nuclear liability law were discussed from different perspectives. The particular problems of the application of the German Atomic Energy Act in the 5 new Laender (the territories of the former GDR) were presented and discussed, namely: The continued validity of old licences issued by the GDR; practical legal problems connected with the construction of nuclear power plants in the 5 new Laender; the legal issues connected with the final repository for radioactive wastes at Morsleben; and the new developments in radiation protection law following from the Unification Treaty and the new ICRP recommendations. All 14 lectures have been abstracted and indexed individually. (orig.) [de

  2. The German energetic turning point: year n+2

    International Nuclear Information System (INIS)

    Cruciani, Michel

    2013-07-01

    This publication proposes an analysis of the evolution of the German energy sector, two years after the adoption of a new energy policy. It notably aims at identifying the consequences of this important turning point which was characterised by the decision to phase out nuclear while keeping on reducing energy consumption and greenhouse gas emissions, and developing renewable energies. In a first part, the author comments the objectives associated with the present evolution in terms of reducing the primary energy consumption, reducing raw electric power consumption, energy consumption in transports, CO_2 emissions, of increasing the share of renewable energies and power production from renewable sources, and of complying with European objectives. The second part discusses technical aspects of the development of power generation from renewable sources by addressing the following issues: prospective, grid extension and strengthening, intermittency management, industrial orientation. The third part addresses economic aspects of this development: promotion of electricity production from renewable sources, relationship between power generation from renewable sources and electricity price, public debate on electricity price, employment and economic benefits, financing the energy transition, and the European dimension. In conclusion, the author discusses whether the German energy shift is a model or a counter-example

  3. Optimization Strategy for Economic Power Dispatch Utilizing Retired EV Batteries as Flexible Loads

    Directory of Open Access Journals (Sweden)

    Shubo Hu

    2018-06-01

    Full Text Available With the increasing penetration of new and renewable energy, incorporating variable adjustable power elements on the demand side is of particular interest. The utilization of batteries as flexible loads is a hot research topic. Lithium-ion batteries are key components in electric vehicles (EVs in terms of capital cost, mass and size. They are retired after around 5 years of service, but still retain up to 80% of their nominal capacity. Disposal of waste batteries will become a significant issue for the automotive industry in the years to come. This work proposes the use of the second life of these batteries as flexible loads to participate in the economic power dispatch. The characteristics of second life batteries (SLBs are varied and diverse, requiring a new optimization strategy for power dispatch at the system level. In this work, SLBs are characterized and their operating curves are obtained analytically for developing an economic power dispatch model involving wind farms and second life batteries. In addition, a dispatch strategy is developed to reduce the dispatch complex brought by the disperse spatial and time distribution of EVs and decrease the system operating cost by introducing incentive and penalty costs in regulating the EV performance. In theory, SLBs are utilized to reduce the peak-valley difference of power loads and to stabilize the power system. Test results based on a ten-unit power system have verified the effectiveness of the proposed dispatch model and the economic benefit of utilizing SLBs as flexible loads in power systems. This work may provide a viable solution to the disposal of waste batteries from EVs and to the stable operation of fluctuating power systems incorporating stochastic renewable energy.

  4. Coping with nuclear power risks: the electric utility incentives

    International Nuclear Information System (INIS)

    Starr, C.; Whipple, C.

    1982-01-01

    The financial risks associated with nuclear power accidents are estimated by interpolating between frequency-vs.-severity data from routine outages and the frequency-vs.-severity estimates from the Nuclear Regulatory Commission's (NRC's) Reactor Safety Study (WASH-1400). This analysis indicates that the expected costs of plant damage and lost power production are large compared to the public risks estimated in WASH-1400, using values from An Approach to Quantitative Safety Goals for Nuclear Power Plants (NUREG-0739), prepared by the NRC Advisory Committee on Reactor Safeguards. Analyses of the cost-effectiveness of accident-prevention investments that include only anticipated public safety benefits will underestimate the value of such investments if reductions in power plant damage risk are not included. The analysis also suggests that utility self-interest and the public interest in safety are generally coincident. It is argued that greater use could be made of this self-interest in regulation if the relationship between the NRC and the industry were more cooperative, less adversary in nature

  5. Teaching German-Americana

    Science.gov (United States)

    Tolzmann, Don Heinrich

    1976-01-01

    A university course entitled "The German-Americans" attempted to study and evaluate German culture in the U. S. Lecture topics and term paper theses are listed and a selected annotated bibliography of German-American culture is included. (CHK)

  6. East German Journalists and the Wende: A history of the collapse and transformation of socialist journalism in Germany

    OpenAIRE

    Guzman, Morgan Morille Schupbach

    2015-01-01

    This dissertation utilizes archival sources and interviews to examine the transformation of the journalism profession in East Germany from the collapse of the German Democratic Republic (GDR) through the unification of the two German states. During this period of dramatic political and social upheaval, East German journalists navigated the divide between socialist journalism of the GDR and democratic journalism of the Federal Republic. By embedding the history of this professional transformat...

  7. Probability of islanding in utility networks due to grid connected photovoltaic power systems

    Energy Technology Data Exchange (ETDEWEB)

    Verhoeven, B.

    2002-09-15

    This report for the International Energy Agency (IEA) made by Task 5 of the Photovoltaic Power Systems (PVPS) programme takes a look at the probability of islanding in utility networks due to grid-connected photovoltaic power systems. The mission of the Photovoltaic Power Systems Programme is to enhance the international collaboration efforts which accelerate the development and deployment of photovoltaic solar energy. Task 5 deals with issues concerning grid-interconnection and distributed PV power systems. This report summarises the results on a study on the probability of islanding in power networks with a high penetration level of grid connected PV-systems. The results are based on measurements performed during one year in a Dutch utility network. The measurements of active and reactive power were taken every second for two years and stored in a computer for off-line analysis. The area examined and its characteristics are described, as are the test set-up and the equipment used. The ratios between load and PV-power are discussed. The general conclusion is that the probability of islanding is virtually zero for low, medium and high penetration levels of PV-systems.

  8. Northeast Utilities' participation in the Kaman/NASA wind power program

    Science.gov (United States)

    Lotker, M.

    1975-01-01

    The role of Northeast Utilities in the Kaman/NASA large wind generator study is reviewed. The participation falls into four principal areas: (1) technical assistance; (2) economic analysis; (3) applications; and (4) institutional and legal. A model for the economic viability of wind power is presented.

  9. German and international energy and environmental policies in 1992 - a wasted year

    International Nuclear Information System (INIS)

    Schuermann, H.J.

    1992-01-01

    The settlement of important energy- and environmental-policy issues hoped for in 1992 has not been reached, and 'wait and see' has become the ruling attitude in matters of energy economy. The investments planned for eastern Germany are stagnating, and the German-German integration suffers from political uncertainties in addition to its market risks. The utilities have been left without the necessary reliable long-term data. Disillusionment also prevails in the European integration process and at the international level. (orig.) [de

  10. Utility survey on nuclear power plant siting and nuclear energy centers

    International Nuclear Information System (INIS)

    Cope, D.F.; Bauman, H.F.

    1977-01-01

    Most of the large U.S. utilities were surveyed by telephone and mail on questions concerning nuclear power plant siting and nuclear energy centers (NECs). The main purpose of the survey was for guidance of ERDA's NEC program. The questions covered the following topics: availability of sites; impact of environmental and other restraints; plans for development of multi-unit sites; interest in NEC development; interest in including fuel-cycle facilities in NECs; and opinions on the roles desired for the state and Federal governments in power plant siting. The main conclusion of the survey was that, while many utilities were considering multiple-unit sites of 2 to 5 units, none were planning larger energy centers at the present time. However, several expressed interest in NECs as a long-range future development

  11. Becoming German: Integration, Citizenship and Territorialization of Germanness

    DEFF Research Database (Denmark)

    Fogelman, Tatiana

    2017-01-01

    understandings of integration and Germanness, this paper highlights the neglected aspect of the ascendance of Integrationspolitik since the turn of the century: namely how it superseded previous regime of completely bifurcated migration policy for "foreigners" on the one hand, and so-called "settlers" of German......, seen ever more as residing within its state territory rather than some diffuse cultural-linguistic space. Moving our understanding of Germanness beyond the "ethnic nationhood model" (Faist 2008), I argue thus that, in conjunction with the new citizenship law, the emergence of Integrationspolitik...

  12. The future of utility-scale wind power

    International Nuclear Information System (INIS)

    Hock, S.; Thresher, R.; Williams, T.

    1992-01-01

    The U.S. Department of Energy (DOE) estimates that by 2030, wind power could potentially displace between 3 and 4 quadrillion (10 15 ) Btus (quads) of primary energy, with an installed electrical generation capacity of 120,000 to 160,000 MW. This forecast is based upon economic analyses indicating that the costs of wind-generated electricity could be cost competitive with conventional fossil-fuel-based generation by early next century. The key to realizing this objective is overcoming technical challenges to the development of a next-generation of advanced wind turbines. These challenges include the detailed characterization of wind inflow to turbines at wind-power-plant sites, an understanding of unsteady aerodynamics, the development of sophisticated computer models of all aspects of turbine operation, and the application of a better understanding of component and system fatigue to new designs. Advanced wind systems will include such new technologies as blade designs incorporating advanced airfoils and new materials, variable-speed operation, advanced power electronics, rotor-hub enhancements, tall towers, aerodynamic controls, advanced drive trains, and expert control systems. A larger market share for wind energy will also require the resolution of issues surrounding transmission, storage, and the integration of an intermittent energy source into the utility grid

  13. The German energy landscape in 2015

    International Nuclear Information System (INIS)

    Lauer, Hartmut

    2016-01-01

    This article proposes a brief overview of the German energy sector: stagnation of primary energy consumption, shares of the different energy sources (renewable, coal, lignite, oil, gas, nuclear), shares of the different electric power production sources and their recent evolution. It evokes issues related to the objectives defined for energy transition, the high level of renewable energy production and the high level of power exports. It outlines that consumption must be reduced to reach the objectives defined for 2020. It notices a stagnation of the energy system de-carbonation, and comments the evolution of electricity prices

  14. Real-Time Monitoring System for a Utility-Scale Photovoltaic Power Plant.

    Science.gov (United States)

    Moreno-Garcia, Isabel M; Palacios-Garcia, Emilio J; Pallares-Lopez, Victor; Santiago, Isabel; Gonzalez-Redondo, Miguel J; Varo-Martinez, Marta; Real-Calvo, Rafael J

    2016-05-26

    There is, at present, considerable interest in the storage and dispatchability of photovoltaic (PV) energy, together with the need to manage power flows in real-time. This paper presents a new system, PV-on time, which has been developed to supervise the operating mode of a Grid-Connected Utility-Scale PV Power Plant in order to ensure the reliability and continuity of its supply. This system presents an architecture of acquisition devices, including wireless sensors distributed around the plant, which measure the required information. It is also equipped with a high-precision protocol for synchronizing all data acquisition equipment, something that is necessary for correctly establishing relationships among events in the plant. Moreover, a system for monitoring and supervising all of the distributed devices, as well as for the real-time treatment of all the registered information, is presented. Performances were analyzed in a 400 kW transformation center belonging to a 6.1 MW Utility-Scale PV Power Plant. In addition to monitoring the performance of all of the PV plant's components and detecting any failures or deviations in production, this system enables users to control the power quality of the signal injected and the influence of the installation on the distribution grid.

  15. Real-Time Monitoring System for a Utility-Scale Photovoltaic Power Plant

    Science.gov (United States)

    Moreno-Garcia, Isabel M.; Palacios-Garcia, Emilio J.; Pallares-Lopez, Victor; Santiago, Isabel; Gonzalez-Redondo, Miguel J.; Varo-Martinez, Marta; Real-Calvo, Rafael J.

    2016-01-01

    There is, at present, considerable interest in the storage and dispatchability of photovoltaic (PV) energy, together with the need to manage power flows in real-time. This paper presents a new system, PV-on time, which has been developed to supervise the operating mode of a Grid-Connected Utility-Scale PV Power Plant in order to ensure the reliability and continuity of its supply. This system presents an architecture of acquisition devices, including wireless sensors distributed around the plant, which measure the required information. It is also equipped with a high-precision protocol for synchronizing all data acquisition equipment, something that is necessary for correctly establishing relationships among events in the plant. Moreover, a system for monitoring and supervising all of the distributed devices, as well as for the real-time treatment of all the registered information, is presented. Performances were analyzed in a 400 kW transformation center belonging to a 6.1 MW Utility-Scale PV Power Plant. In addition to monitoring the performance of all of the PV plant’s components and detecting any failures or deviations in production, this system enables users to control the power quality of the signal injected and the influence of the installation on the distribution grid. PMID:27240365

  16. Real-Time Monitoring System for a Utility-Scale Photovoltaic Power Plant

    Directory of Open Access Journals (Sweden)

    Isabel M. Moreno-Garcia

    2016-05-01

    Full Text Available There is, at present, considerable interest in the storage and dispatchability of photovoltaic (PV energy, together with the need to manage power flows in real-time. This paper presents a new system, PV-on time, which has been developed to supervise the operating mode of a Grid-Connected Utility-Scale PV Power Plant in order to ensure the reliability and continuity of its supply. This system presents an architecture of acquisition devices, including wireless sensors distributed around the plant, which measure the required information. It is also equipped with a high-precision protocol for synchronizing all data acquisition equipment, something that is necessary for correctly establishing relationships among events in the plant. Moreover, a system for monitoring and supervising all of the distributed devices, as well as for the real-time treatment of all the registered information, is presented. Performances were analyzed in a 400 kW transformation center belonging to a 6.1 MW Utility-Scale PV Power Plant. In addition to monitoring the performance of all of the PV plant’s components and detecting any failures or deviations in production, this system enables users to control the power quality of the signal injected and the influence of the installation on the distribution grid.

  17. The rise of smart customers. How consumer power will change the global power and utilities business. What the sector thinks

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-09-15

    This report is the second in a two-part study, geared to helping power and utilities companies adapt their business strategies and customer handling in a new smart world. It explores the views of power and utilities leaders across 12 countries on how smart might change consumers' needs and behaviors, what new services they plan to offer and where they see the strongest new opportunities and competitors. We also compare these results with those of the first study, which examined the views of consumers and their appetite for new smart services.

  18. Utility Test Results of a 2-Megawatt, 10-Second Reserve-Power System

    Energy Technology Data Exchange (ETDEWEB)

    BALL,GREG J.; NORRIS,BENJAMIN L.

    1999-10-01

    This report documents the 1996 evaluation by Pacific Gas and Electric Company of an advanced reserve-power system capable of supporting 2 MW of load for 10 seconds. The system, developed under a DOE Cooperative Agreement with AC Battery Corporation of East Troy, Wisconsin, contains battery storage that enables industrial facilities to ''ride through'' momentary outages. The evaluation consisted of tests of system performance using a wide variety of load types and operating conditions. The tests, which included simulated utility outages and voltage sags, demonstrated that the system could provide continuous power during utility outages and other disturbances and that it was compatible with a variety of load types found at industrial customer sites.

  19. Remunicipalisation and Foundation of Municipal Utilities in the German Energy Sector: Details about Newly Established Enterprises

    Directory of Open Access Journals (Sweden)

    Oliver Wagner

    2017-09-01

    Full Text Available Since the majority of network concession contracts in Germany were set to expire some time between 2005 and 2016, a window of opportunity arose in which to rebuild and remunicipalise the local energy supply. As a result, 72 new local power companies were established in Germany within the space of just seven years (between early 2005 and late 2012. This paper provides an introduction to the topic of establishing municipal utilities in Germany. The findings were identified on the basis of the comprehensive screening of all newly established municipal utilities in Germany. Our analysis provides information about regional concentration, the size of municipalities, the legal forms of the newly founded municipal public utilities and the role of strategic partnerships. The key findings are that remunicipalisation is not a question of size and that knowledge gaps may be closed by entering into close strategic partnerships.

  20. Development of the German network for transporting electricity: A major challenge for managers

    International Nuclear Information System (INIS)

    Feix, Olivier

    2013-01-01

    The catastrophe at the Japanese nuclear power plant in Fukushima has deeply altered Germany's energy policy. The news from Japan forced the federal government to step up its efforts so as to expand more quickly the share of renewable sources in the German energy mix and, on short notice, put an end to nuclear power. This Energiewende, as the Germans call it, is a major policy priority for the government and an outstanding project that mobilizes all of German society. This turning point in energy policy has entailed rewriting several laws so as to provide a legal framework for the transition. Most stakeholders expect that important amendments will be made to the texts directly related to production facilities. What is noticeable and even surprising is the scope of the changes in laws about electricity grids, in particular about managing and developing the network for transporting electricity

  1. Simulation analysis of emissions trading impact on a non-utility power plant

    International Nuclear Information System (INIS)

    Imran, Kashif; Ahmad, Intesar; Hassan, Tehzeebul; Aslam, Muhammad Farooq; Ngan, Hon-Wing

    2009-01-01

    Non-utility power plants can competitively participate in open electricity market to reduce operational costs but in the absence of pollution charges or emissions trading such generators are tempted to cause greater pollution for profit maximization. This paper presents a solution that incorporates pollution charges for nitrogen oxides and sulphur dioxide emissions in line with existing national environmental quality standards and a new carbon dioxide emissions trading mechanism. A novel approach has been used for allocation of allowable emissions that favors efficiently fuelled and environmentally friendly operation for maximizing profit. Impact of proposed carbon trading on economical utilization of enormous indigenous coal reserves has been analyzed and determined to be acceptable. Software developed in this paper, harnessing Sequential Quadratic Programming capabilities of Matlab, is shown to be adequate simulation tool for various emissions trading schemes and an useful operational decision making tool for constrained non-linear optimization problem of a non-utility power plant. (author)

  2. Simulation analysis of emissions trading impact on a non-utility power plant

    Energy Technology Data Exchange (ETDEWEB)

    Imran, Kashif; Ahmad, Intesar [Department of Electrical Engineering, COMSATS Institute of IT, Lahore (Pakistan); Hassan, Tehzeebul [Department of Electrical Engineering, University of Engineering and Technology (UET), Lahore (Pakistan); Aslam, Muhammad Farooq [Department of Electrical Engineering, University of Management and Technology (UMT), Lahore (Pakistan); Ngan, Hon-Wing [Department of Electrical Engineering, Hong Kong Polytechnic University (China)

    2009-12-15

    Non-utility power plants can competitively participate in open electricity market to reduce operational costs but in the absence of pollution charges or emissions trading such generators are tempted to cause greater pollution for profit maximization. This paper presents a solution that incorporates pollution charges for nitrogen oxides and sulphur dioxide emissions in line with existing national environmental quality standards and a new carbon dioxide emissions trading mechanism. A novel approach has been used for allocation of allowable emissions that favors efficiently fuelled and environmentally friendly operation for maximizing profit. Impact of proposed carbon trading on economical utilization of enormous indigenous coal reserves has been analyzed and determined to be acceptable. Software developed in this paper, harnessing Sequential Quadratic Programming capabilities of Matlab, is shown to be adequate simulation tool for various emissions trading schemes and an useful operational decision making tool for constrained non-linear optimization problem of a non-utility power plant. (author)

  3. Generative Adversarial Networks Based Heterogeneous Data Integration and Its Application for Intelligent Power Distribution and Utilization

    Directory of Open Access Journals (Sweden)

    Yuanpeng Tan

    2018-01-01

    Full Text Available Heterogeneous characteristics of a big data system for intelligent power distribution and utilization have already become more and more prominent, which brings new challenges for the traditional data analysis technologies and restricts the comprehensive management of distribution network assets. In order to solve the problem that heterogeneous data resources of power distribution systems are difficult to be effectively utilized, a novel generative adversarial networks (GANs based heterogeneous data integration method for intelligent power distribution and utilization is proposed. In the proposed method, GANs theory is introduced to expand the distribution of completed data samples. Then, a so-called peak clustering algorithm is proposed to realize the finite open coverage of the expanded sample space, and repair those incomplete samples to eliminate the heterogeneous characteristics. Finally, in order to realize the integration of the heterogeneous data for intelligent power distribution and utilization, the well-trained discriminator model of GANs is employed to check the restored data samples. The simulation experiments verified the validity and stability of the proposed heterogeneous data integration method, which provides a novel perspective for the further data quality management of power distribution systems.

  4. Study of the possibility of thermal utilization of contaminated water in low-power boilers

    Science.gov (United States)

    Roslyakov, P. V.; Proskurin, Y. V.; Zaichenko, M. N.

    2017-09-01

    The utilization of water contaminated with oil products is a topical problem for thermal power plants and boiler houses. It is reasonable to use special water treatment equipment only for large power engineering and industry facilities. Thermal utilization of contaminated water in boiler furnaces is proposed as an alternative version of its utilization. Since there are hot-water fire-tube boilers at many enterprises, it is necessary to study the possibility of thermal utilization of water contaminated with oil products in their furnaces. The object of this study is a KV-GM-2.0 boiler with a heating power of 2 MW. The pressurized burner developed at the Moscow Power Engineering Institute, National Research University, was used as a burner device for supplying liquid fuel. The computational investigations were performed on the basis of the computer simulation of processes of liquid fuel atomization, mixing, ignition, and burnout; in addition, the formation of nitrogen oxides was simulated on the basis of ANSYS Fluent computational dynamics software packages, taking into account radiative and convective heat transfer. Analysis of the results of numerical experiments on the combined supply of crude oil and water contaminated with oil products has shown that the thermal utilization of contaminated water in fire-tube boilers cannot be recommended. The main causes here are the impingement of oil droplets on the walls of the flame tube, as well as the delay in combustion and increased emissions of nitrogen oxides. The thermal utilization of contaminated water combined with diesel fuel can be arranged provided that the water consumption is not more than 3%; however, this increases the emission of nitrogen oxides. The further increase in contaminated water consumption will lead to the reduction of the reliability of the combustion process.

  5. Retrieval and the development of German federalism in the postwar period

    Directory of Open Access Journals (Sweden)

    O. A. Mayor

    2014-05-01

    Full Text Available The path to understanding the nature of the German federal state is the analysis of its historical development. The process of establishing the federal structure of the German territory is long and quite complex , due to complex factors of social , legal and political nature. Federal relations on German soil in a given historical period is a reflection of political realities and lessons of the previous state . This paper considers the problem of revival of federal structures in the context of the new German state. Author determined arguments in favor of the federal structure of the state at the time. Established a task that had set the parents creators of the Weimar constitution. It is noted that much attention has been given implementation mechanisms controlling the balance of power and authority , not the vertical distribution of competencies. The features of the functioning of West German federalism. This paper analyzes the main structural problems and dysfunctions in the system of German federalism, which found its expression in the post­war period ; considered federal principles in Eastern Germany, who were in the tension field of centralist ideological trends in the postwar period. The author points out that the revival of German federalism influenced by factors such as domestic and foreign policy issues and concludes on the need for transformation of the federal system.

  6. National Peer Reviews. Self-assessment programs of German nuclear power plants

    International Nuclear Information System (INIS)

    Grauf, E.

    2000-01-01

    Preliminary experience seems to indicate that the concept of national peer reviews is a useful tool capable of improving and harmonizing the standards of operation in German plants. However, a final evaluation is possible only after completion of the program, i.e. probably by the end 2000. The internal national peer reviews do not replace existing reviews, such as the WANO peer reviews or the IAEA OSART missions, but rather supplement them. As a major element of self-assessment, they mainly serve to exchange effectively among German plants know-how and experience, to harmonize standards of plant operation, eliminate any weak spots identified, and generally counteract blindness to one's own faults. Whether the envisaged objective of standardized plant operations will be achieved in the end depends very much on the way in which the results of the reviews will be handled. In particular, it will be interesting to see to what extent there is willingness to take on board any recommendations and proposals made and/or introduce what is called good operating practice. (orig.) [de

  7. Concept of electric power output control system for atomic power generation plant utilizing cool energy of stored snow

    International Nuclear Information System (INIS)

    Kamimura, Seiji; Toita, Takayuki

    2003-01-01

    A concept of the SEAGUL system (Snow Enhancing Atomic-power Generation UtiLity) is proposed in this paper. Lowering the temperature of sea water for cooling of atomic-power plant will make a efficiency of power generation better and bring several ten MW additional electric power for 1356 MW class plant. The system concept stands an idea to use huge amount of seasonal storage snow for cooling water temperature control. In a case study for the Kashiwazaki-Kariwa Nuclear Power Station, it is estimated to cool down the sea water of 29degC to 20degC by 80 kt snow for 3 hours in a day would brought 60 MWh electric power per a day. Annually 38.4 Mt of stored snow will bring 1800 MWh electric power. (author)

  8. Helping utilities harness the power of the web for substation automation

    Energy Technology Data Exchange (ETDEWEB)

    Finney, D.

    2000-11-01

    The significance of the Internet to the deregulated electric power industry and the ability to tap into the benefits of Web-enabled substation monitoring and control are reviewed. It is this author's contention that the convergence of Internet access from PCs, servers and Internet-ready intelligent electronic devices make it possible to have full-scale substation automation and control without the high price tag associated with SCADA systems. Whereas in the past automation solutions were thought to be appropriate only for big utilities, the potential of the Internet such as the GE-hosted enerVista.com service, which is made up of a number of modules which can provide many of the services of a complex enterprise management system at a fraction of the cost, make it possible for smaller utilities to overcome substation automation problems at an affordable cost. By having the communications link over the web, and data acquisition hosted by an outside vendor, even the smallest municipal utility can have the most up-to-date equipment at their disposal, and expand their control to SCADA-level functionality without having to incur the usual programming and technology costs. The example of Whitby Hydro to automate their three substation system with GE Power Management's Universal Relay (UR) intelligent electronic device system by installing a modem as an Internet appliance for 24/7 monitoring, optional protection and control, is cited. Utilities in Oshawa and Thunder Bay, Ontario, and others in New York State and Tennessee, are some of the other utilities currently involved in developing web-based applications that address their unique requirements. At present, there appears to be no limit to the role that the Internet can play in substation automation and control for utilities competing in a global market.

  9. The German energy transition. Design, implementeation, cost and lessons

    Energy Technology Data Exchange (ETDEWEB)

    Unnerstall, Thomas

    2017-07-01

    The book presents a comprehensive and systematic account of the concept, the current status and the costs of the German energy transition: the Energiewende. Written by an insider who has been working in the German energy industry for over 20 years, it follows a strictly non-political, neutral approach and clearly outlines the most relevant facts and figures. In particular, it describes the main impacts of the Energiewende on the German power system and Germany's national economy. Furthermore, it addresses questions that are of global interest with respect to energy transitions, such as the cost to the national economy, the financial burden on private households and companies and the actual effects on CO{sub 2} emissions. The book also discusses what could have been done better in terms of planning and implementing the Energiewende, and identifies important lessons for other countries that are considering a similar energy transition.

  10. The German energy transition. Design, implementeation, cost and lessons

    International Nuclear Information System (INIS)

    Unnerstall, Thomas

    2017-01-01

    The book presents a comprehensive and systematic account of the concept, the current status and the costs of the German energy transition: the Energiewende. Written by an insider who has been working in the German energy industry for over 20 years, it follows a strictly non-political, neutral approach and clearly outlines the most relevant facts and figures. In particular, it describes the main impacts of the Energiewende on the German power system and Germany's national economy. Furthermore, it addresses questions that are of global interest with respect to energy transitions, such as the cost to the national economy, the financial burden on private households and companies and the actual effects on CO 2 emissions. The book also discusses what could have been done better in terms of planning and implementing the Energiewende, and identifies important lessons for other countries that are considering a similar energy transition.

  11. Power Electronics for Distributed Energy Systems and Transmission and Distribution Applications: Assessing the Technical Needs for Utility Applications

    Energy Technology Data Exchange (ETDEWEB)

    Tolbert, L.M.

    2005-12-21

    Power electronics can provide utilities the ability to more effectively deliver power to their customers while providing increased reliability to the bulk power system. In general, power electronics is the process of using semiconductor switching devices to control and convert electrical power flow from one form to another to meet a specific need. These conversion techniques have revolutionized modern life by streamlining manufacturing processes, increasing product efficiencies, and increasing the quality of life by enhancing many modern conveniences such as computers, and they can help to improve the delivery of reliable power from utilities. This report summarizes the technical challenges associated with utilizing power electronics devices across the entire spectrum from applications to manufacturing and materials development, and it provides recommendations for research and development (R&D) needs for power electronics systems in which the U.S. Department of Energy (DOE) could make a substantial impact toward improving the reliability of the bulk power system.

  12. Docommissioning of nuclear power plants

    International Nuclear Information System (INIS)

    Essmann, J.

    1981-01-01

    The German utilities operating nuclear power plants have long concerned themselves with aspects of decommissioning and for this purpose an engineering company was given a contract to study the entire spectrum of decommissioning. The results of this study have been available in autumn 1980 and it is possible to discuss all the aspects of decommissioning on a new basis. Following these results no change in the design concept of LWR nuclear power plants in operation or under construction is necessary because the techniques, necessary for decommissioning, are fully available today. The technical feasibility of decommissioning for power plants of Biblis A and KRB type has been shown in detail. The calculations of the quantity of waste produced during removal of a nuclear power plant could be confirmed and it could be determined with high procedure. The radiation dose to the decommissioning personnel is in the range of the radiation protection regulations and is in the same range as the radiation dose to the personnel within a yearly inservice inspection. (AF)

  13. Joint Utility-Based Power Control and Receive Beamforming in Decentralized Wireless Networks

    Directory of Open Access Journals (Sweden)

    Angela Feistel

    2010-01-01

    Full Text Available This paper addresses the problem of joint resource allocation in general wireless networks and its practical implementation aspects. The objective is to allocate transmit powers and receive beamformers to the users in order to maximize a network-wide utility that represents the attained QoS and is a function of the signal-to-interference ratios. This problem is much more intricate than the corresponding QoS-based power control problem. In particular, it is not known which class of utility functions allows for a convex formulation of this problem. In case of perfect synchronization, the joint power and receiver control problem can be reformulated as a power control problem under optimal receivers. Standard gradient projection methods can be applied to solve this problem. However, these algorithms are not applicable in decentralized wireless networks. Therefore, we decompose the problem and propose a convergent alternate optimization that is amenable to distributed implementation. In addition, in real-world networks noisy measurements and estimations occur. Thus, the proposed algorithm has to be investigated in the framework of stochastic approximation. We discuss practical implementation aspects of the proposed stochastic algorithm and investigate its convergence properties by simulations.

  14. Does the expansion of German high voltage power supply system imply health risks?; Geht vom Ausbau elektrischer Hochspannungsleitungen eine Gefahr fuer die menschliche Gesundheit aus?

    Energy Technology Data Exchange (ETDEWEB)

    Kappos, Andreas D.

    2016-07-01

    The decision of the German parliament to gradually close down nuclear power plants mainly located in the south of Germany and to support wind farms in the North Sea mud flats as the dominant regenerative energy source requires the strengthening and enlargement of the power supply system with the installation of new long distance high voltage power lines. The legally fixed dimension and formality of the actual planning process are discussed as well as the legal regulations for the protection of human health. Guided by the assessment of IARC a ''possible'' carcinogenic effect of low frequency electromagnetic fields on people living in the vicinity of high voltage power lines has to be considered. Therefore from a preventive viewpoint the minimal distance of 400 m between newly planned high voltage power lines and human settlements required by law seem justified.

  15. Efficient energy utilization and environmental issues applied to power planning

    International Nuclear Information System (INIS)

    Campbell, Hector; Montero, Gisela; Perez, Carlos; Lambert, Alejandro

    2011-01-01

    This document shows the importance of policies for electric energy savings and efficient energy utilization in power planning. The contributions of economic, social, and environmental items were evaluated according to their financial effects in the delay of investments, reduction of production costs and decrement of environmental emissions. The case study is Baja California, Mexico; this system has a unique primary source: geothermal energy. Whether analyzing the planning as usual or planning from the supply side, the forecast for 2005-2025 indicates that 4500 MW additional installed capacity will be required (3-times current capacity), representing an investment that will emit 12.7 Mton per year of CO 2 to the atmosphere and will cost US$2.8 billion. Systemic planning that incorporates polices of energy savings and efficiency allows the reduction of investments and pollutant emissions. For example, a reduction of 20% in the growth trend of the electricity consumption in the industrial customers would save US$10.4 billion over the next 20 years, with a potential reduction of 1.6 Mton/year of CO 2 . The increase in geothermal power generation is also attractive, and it can be combined with the reduction of use and energy losses of utilities, which would save US$13.5 billion and prevent the discharge of 8.5 Mton/year of CO 2 . - Highlights: → We contrast power planning methods for supply electricity for economy development. → Importance of policies for electricity savings and efficient use in power planning. → Systemic planning facilitates decision-making process for electricity optimization. → Supply-side planning will cause climb in prices and loss of energy self-sufficiency. → Power planning should be immersed in an environment of appropriate energy policies.

  16. Study of the Utilization BWR Type Nuclear Power Reactor for Desalination Process

    International Nuclear Information System (INIS)

    Itjeu Karliana; Sumijanto; Dhandhang Purwadi, M.

    2008-01-01

    The needs of fresh water increased by rapid population growth and industrials expansion, but these demands can not be prepared naturally. Following this case, seawater desalination becomes the primer option which can fulfill the need through the nuclear desalination technology. The coupled nuclear power reactor enables to supply thermal energy for auxiliary equipment and pumps operation. The utilization study of power reactor type BWR coupled with desalination process has been performed. The goal of study is to obtain characteristic data of desalted water specification which desalination system coupling with nuclear power plant produced energy for desalination process. The study is carried out by browsing data and information, and comprehensive review of thermal energy correlation between NPP with desalination process installation. According to reviewing are found that the thermal energy and electric power utilization from the nuclear power reactor are enable to remove the seawater to produce desalted water and also to operate auxiliary equipments. The assessment results is VK-300 reactor prototype, BWR type 250 MW(e) power are cogeneration unit can supplied hot steam temperature 285 °C to the extraction turbine to empower 150 MW electric power, and a part of hot steam 130 °C is use to operate desalination process and remind heat is distribute to the municipal and offices at that region. The coupled of VK-300 reactor power type BWR with desalination installation of MED type enable to produce desalted water with high quality distillate. Based on the economic calculation that the VK-300 reactor power of BWR type produced water distillate capacity is 300.000 m 3 /hour with cost US$ 0.58/m 3 . The coupling VK-300 reactor power type BWR with MED desalination plant is competitive economically. (author)

  17. Review of the German Reactor Safety Study

    International Nuclear Information System (INIS)

    Bayer, A.

    1980-01-01

    The accident risks in German nuclear power plants are reviewed. Parameters influencing the extent and consequences of an accident are differentiated. Risks of normal operation, war, and sabotage have not been considered. Measures taken by the operating shaft in the course of an accident are taken into account. The knowledge thus gained can be applied in the planning of emergency measures. (DG) [de

  18. UTILIZATION OF SECONDARY COMBUSTIBLE POWER RESOURCES FOR PRODUCTION OF MUNICIPAL AND HOUSEHOLD FUEL

    Directory of Open Access Journals (Sweden)

    N. I. Berezovsky

    2005-01-01

    Full Text Available The paper shows an advantage to utilize secondary power resources (lignin, wastes of fine coal with its dressing, sawdust in mixture with local types of fuel (peat in order to fulfill power supply purpose, namely: obtaining hot water in boilers of small capacity and obtaining household fuel.

  19. A German catastrophe? German historians and the Allied bombings, 1945-2010

    NARCIS (Netherlands)

    von Benda-Beckmann, B.R.

    2010-01-01

    As one of the major symbols of German suffering, the Allied bombing war left a strong imprint on German society. To a much wider extent than is often claimed, the Allied bombings became part of German debates on the Second World War. In both the GDR as well as the Federal Republic before and after

  20. CEZ utility's coal-fired power plants: towards a higher environmental friendliness

    International Nuclear Information System (INIS)

    Kindl, V.; Spilkova, T.; Vanousek, I.; Stehlik, J.

    1996-01-01

    Environmental efforts of the major Czech utility, CEZ a.s., are aimed at reducing air pollution arising from electricity and heat generating facilities. There are 3 main kinds of activity in this respect: phasing out of coal fired power plants; technological provisions to reduce emissions of particulate matter, sulfur dioxide, and nitrogen oxides from those coal fired units that are to remain in operation after 1998; and completion of the Temelin nuclear power plant. In 1995, emissions of particulate matter, sulfur dioxide, nitrogen oxides, and carbon monoxide from CEZ's coal fired power plants were 19%, 79%, 59%, and 60%, respectively, with respect to the situation in 1992. The break-down of electricity generation by CEZ facilities (in GWh) was as follows in 1995: hydroelectric power plants 1673, nuclear power plants 12230, coal fired power plants without desulfurization equipment 30181, and coal fired power plants with desulfurization equipment 2277. Provisions implemented to improve the environmental friendliness of the individual CEZ's coal fired power plants are described in detail. (P.A.). 5 tabs., 1 fig

  1. Enhanced Recovery Utilizing Variable Frequency Drives and a Distributed Power System

    Energy Technology Data Exchange (ETDEWEB)

    Randy Peden; Sanjiv Shah

    2005-07-26

    This report describes complete results of the project entitled ''Enhanced Recovery Utilizing Variable Frequency Drives and a Distributed Power System''. This demonstration project was initiated in July 2003 and completed in March 2005. The objective of the project was to develop an integrated power production/variable frequency drive system that could easily be deployed in the oil field that would increase production and decrease operating costs. This report describes all the activities occurred and documents results of the demonstration.

  2. Threats and opportunities facing the power utility industry

    International Nuclear Information System (INIS)

    Read, W.S.

    1996-01-01

    This address describes how, throughout the world, technological, ideological, and economic forces are reshaping the way one works and does business. The electric power industry, one of the last bastions of conservatism, has awakened to the fact that it, too, is not immune to the pressure for change. It realizes that it cannot afford to bury its head in the sand when confronted with this challenge. This awakening will provide utilities with the stimulus needed to be innovative and cooperative, in partnership with their customers, in their response to this new business opportunity

  3. Outlook for gas turbine plant utilization in htgr power facilities

    International Nuclear Information System (INIS)

    Beknev, V.S.; Leont'ev, A.I.; Shmidt, K.L.; Surovtsev, I.G.

    1983-01-01

    The nuclear reactor power plants that have found greatest favor in the nuclear power industry worldwide are pressurized water reactors, boiling-water reactors, and uranium-graphite channel reactors with saturated-steam steam turbine units (PTU). The efficiency of power generating stations built around reactors such as these does not exceed 30 to 32%, and furthermore they are ''tied down'' to water reservoirs, with the entailed severe thermal effects on the environmental surroundings. The low efficiency range cited is evidence of inefficacious utilization of the nuclear fuel, reserves of which have their limits just as there are limits to available reserves of fossil fuels. Forecasts are being floated of a possible uranium crisis (profitable mining of uranium) in the mid-1990's, even with the expected development of breeder reactors to bridge the gap

  4. Catalogue of requirements for a plant-specific safety inspection of German nuclear power plants taking into account the Fukushima-I (Japan) events; Anforderungskatalog fuer anlagenbezogene Ueberpruefungen deutscher Kernkraftwerke unter Beruecksichtigung der Ereignisse in Fukushima-I (Japan)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-03-30

    The catalogue of requirements for a plant-specific safety inspection of German nuclear power plants taking into account the Fukushima-I (Japan) events worked out by the German RSK (reactor safety commission) includes the following inspection topics: natural events like earth quakes, floods, weather-based consequences and possible superposition; civilization-based events like airplane crash, gas release, reactor accident consequences for neighboring units, terroristic impacts, external attacks on computer-based control systems. Further event-independent assumptions have to be considered: station blackout, long-term emergency power supply requirement, failure of auxiliary cooling water supply, efficacy of preventive measures, aggravating boundary conditions for the performance of emergency measures.

  5. Utilities Power Change: Engaging Commercial Customers in Workplace Charging

    Energy Technology Data Exchange (ETDEWEB)

    Lommele, S. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Dafoe, W. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-05-31

    Using electricity to power vehicles can help advance energy security and reduce emissions, and also presents a new market opportunity for utilities looking to diversify and offer an added benefit to commercial customers. By providing plug-in electric vehicle (PEV) charging stations for their employees, commercial customers can help attract and retain a cutting-edge workforce. These employers also signal a commitment to sustainability and demonstrate progressive leadership and a willingness to adopt advanced technology.

  6. Pakistan's rise to nuclear power and the contribution of German companies

    Energy Technology Data Exchange (ETDEWEB)

    Ricke, Klaus-Peter

    2013-09-01

    The amendment of the Foreign Trade and Payments Act (Aussenwirtschaftsgesetz) has prompted the preparation of this paper because of concerns over potential setbacks in advances achieved over the past twenty years in regulating German exports to non-EU countries and shipments to member states of the EU and the watering down of export restrictions to correspond to the low standards in place at the EU level (with the objective of streamlining the Foreign Trade and Payments Act and nullifying special German requirements which place German exporters at a disadvantage compared with their European competitors, according to a spokesperson of the German Federal Ministry of Economics and Technology). This would send the wrong signal on combating proliferation. From the 1970s to 1990s the Federal Republic of Germany played an extremely negative role because it opened the doors wide to the proliferation of weapons of mass destruction through lax legislation and even more slipshod enforcement. Alarmed by several scandals, in recent years the German government has taken the lead regarding this issue and it would be appropriate for it to continue to fulfill this role. The attitude of the German governments in the 1970s to 1990s as well as the attitude of the key government authorities responsible for controlling exports becomes clear through the example of the cases of illegal exports of nuclear technology to Pakistan. Until the early 1990s the legal situation was such that some acts of proliferation could not even be prosecuted because the licensing regime included only goods listed in Part 1 of the Export Control List (Ausfuhrliste Teil I). The relevant authorities - the Bundesamt fuer Wirtschaft (Federal Office of Economics, BAW) and customs authorities - were neither in terms of personnel nor due to the deficiency of their computer equipment - in a position to carry out their legally prescribed duties. The maximum sentence for even the most serious proliferation violations

  7. Project risk management for development of non-utility power generators (NUGs)

    International Nuclear Information System (INIS)

    Lau, T.

    1990-01-01

    The growing Non-Utility Generation (NUG) industry has brought new opportunities and challenges for the insurance industry. There can be unique engineering and financial risks involved in the development of Non-Utility Power Generation projects. The use of new technologies to meet stringent environmental regulations and to improve project performance and efficiency presents new challenges to the project developers and designers. The lack of funding, resources and experience of some of these projects may create unusual risks that could result in failure or deficiency in the performance of the projects

  8. Utilizing a vanadium redox flow battery to avoid wind power deviation penalties in an electricity market

    International Nuclear Information System (INIS)

    Turker, Burak; Arroyo Klein, Sebastian; Komsiyska, Lidiya; Trujillo, Juan José; Bremen, Lueder von; Kühn, Martin; Busse, Matthias

    2013-01-01

    Highlights: • Vanadium redox flow battery utilized for wind power grid integration was studied. • Technical and financial analyses at single wind farm level were performed. • 2 MW/6 MW h VRFB is suitable for mitigating power deviations for a 10 MW wind farm. • Economic incentives might be required in the short-term until the VRFB prices drop. - Abstract: Utilizing a vanadium redox flow battery (VRFB) for better market integration of wind power at a single wind farm level was evaluated. A model which combines a VRFB unit and a medium sized (10 MW) wind farm was developed and the battery was utilized to compensate for the deviations resulting from the forecast errors in an electricity market bidding structure. VRFB software model which was introduced in our previous paper was integrated with real wind power data, power forecasts and market data based on the Spanish electricity market. Economy of the system was evaluated by financial assessments which were done by considering the VRFB costs and the amount of deviation penalty payments resulting from forecast inaccuracies

  9. Proceedings of international workshop on utilization of nuclear power in oceans (N'ocean 2000)

    International Nuclear Information System (INIS)

    Yamaji, A.; Nariyama, N.; Sawada, K.

    2000-03-01

    Human beings and the ocean have maintained close relations for a long time. The ocean produced the life at very old time and human beings have been benefited by ocean, particularly in Japan that is surrounded by the ocean. In the utilization of nuclear power in ocean, Japan has been very active from the beginning of the development of nuclear power. The nuclear powered ship MUTSU has been developed and completed the experimental voyage. Besides the nuclear powered ship, we are using the ocean for the transportation of radioactive materials. This International Workshop aimed at offering further information about nuclear utilization in oceans such as icebreakers, deep-sea submarines, high speed carriers, floating plant, desalination and heating plants, radioactive materials transport ships, and so on. The discussions on the economical, environmental and scientific effects are included. The 36 of the present papers are indexed individually. (J.P.N.)

  10. A municipal utility seeks IPP power

    International Nuclear Information System (INIS)

    Whitney, D.D.

    1990-01-01

    The Sacramento Municipal Utility District (SMUD), primarily located in Sacramento County, one of the ten highest growth areas in the U.S. today, serves a 900 square mile area with over 450,000 customers and has seen peak loads of about 2200 MW. In June of 1989, the customer-owners of SMUD, voted to shutdown the 913 MW Rancho Seco Nuclear Generating Station which constituted nearly one-half of the district's power resources. The need to immediately replace the lost capacity was somewhat tempered as a consequence of previously signed contracts with the Pacific Gas and Electric Company (PG and E) for 550 MW and with the Southern California Edison Company (SCE) for 300 MW. Both contracts provide power for only ten years, ending in 1999, and while being competitively priced in the early years, include significant escalation in capacity charges beginning in 1995, and always price energy at local natural gas market prices while including other arduous conditions. When combined with their hydroelectric and other resources these contracts allow SMUD to remain competitive. However, there remains the incentive, and ultimately necessity, of replacing the contracts with alternative resources. This paper describes an aggressive program to obtain replacement resources which will diversify SMUD's resource mix and protect their customer-owners from the uncertainties of the future while retaining the benefits of tax exempt financing and being their own stockholders

  11. Some possibilities for improvement of fuel utilization in nuclear power plants

    International Nuclear Information System (INIS)

    Kocic, A.; Marinkovic, N.

    1983-01-01

    Methods for improving the nuclear fuel utilization with the emphasis on LWRs are being dealt with in this paper. Some basic results concerning tubular fuel pellets of the Krsko nuclear power plants are presented, showing promising possibilities for uranium saving from the neutronics point of view. (author)

  12. Great Britain and German-Polish Relations, 1929–1931

    Directory of Open Access Journals (Sweden)

    Zotova Ekaterina

    2014-12-01

    Full Text Available The article deals with the study of British-German relations during the period of exacerbation of territorial disputes between Germany and Poland in 1929-1931. Germany was making plans for revising the eastern borders. It sought to enlist the support of the new Labour government. Britain didn’t only approve of Germany's intention to carry out revision of the Treaty of Versailles (reparation issue, the evacuation of the Rhineland and the change in the German-Polish border, but also supported the strengthening of the political and economic situation in Germany as a whole. Assistance to Germany was advantageous for Britain. Firstly, the British support helped to improve the capacity of the purchasing power of the German market as one of the traditional markets of the English sale. Secondly, the strengthening of the position of the German cabinet meant failure of the French policy in Europe at this stage. The defeat of France in a dispute on the issue of early evacuation of the Rhineland would seriously devalue the foreign policy initiatives of Paris. Thirdly, the British government hoped that Germany will go into orbit of British political influence. The identity of the positions of the German and the British cabinets were considered as the components of British policy success not only in relations with France and Italy, but also with Czechoslovakia and Poland. Since the formation of the MacDonald’s cabinet, anti-Polish moods increased in the British course for the settlement of German-Polish relations. However, the threat of an attack on Poland by Germany was regarded by the government of Britain as unacceptable way of resolving the German-Polish conflict. Britain tried to follow the traditional foreign policy concept of “balance of power”, but the inefficiency of British policy “mediation” in European affairs was clearly shown in times of growing financial and economic crisis. The issue of the German-Polish border remained unsolved.

  13. "We call it Springbok-German!": language contact in the German communities in South Africa.

    OpenAIRE

    Franke, Katharina

    2017-01-01

    Varieties of German are spoken all over the world, some of which have been maintained for prolonged periods of time. As a result, these transplanted varieties often show traces of the ongoing language contact as specific to their particular context. This thesis explores one such transplanted German language variety – Springbok- German – as spoken by a small subset of German Lutherans in South Africa. Specifically, this study takes as its focus eight rural German communities acr...

  14. National Maglev initiative: California line electric utility power system requirements

    Science.gov (United States)

    Save, Phil

    1994-01-01

    The electrical utility power system requirements were determined for a Maglev line from San Diego to San Francisco and Sacramento with a maximum capacity of 12,000 passengers an hour in each direction at a speed of 300 miles per hour, or one train every 30 seconds in each direction. Basically the Maglev line requires one 50-MVA substation every 12.5 miles. The need for new power lines to serve these substations and their voltage levels are based not only on equipment loading criteria but also on limitations due to voltage flicker and harmonics created by the Maglev system. The resulting power system requirements and their costs depend mostly on the geographical area, urban or suburban with 'strong' power systems, or mountains and rural areas with 'weak' power systems. A reliability evaluation indicated that emergency power sources, such as a 10-MW battery at each substation, were not justified if sufficient redundancy is provided in the design of the substations and the power lines serving them. With a cost of $5.6 M per mile, the power system requirements, including the 12-kV DC cables and the inverters along the Maglev line, were found to be the second largest cost component of the Maglev system, after the cost of the guideway system ($9.1 M per mile), out of a total cost of $23 M per mile.

  15. Utilizing PowerPoint Presentation to Promote Fall Prevention among Older Adults

    Science.gov (United States)

    McCrary-Quarles, Audrey R.

    2008-01-01

    This study evaluated a PowerPoint home safety (PPHS) presentation in enhancing awareness, knowledge and behavior change among senior center attendees in southern Illinois. Twelve centers were utilized as data collection sites in a pretest-posttest control group design. Through stratified randomization, centers were placed into categories (high,…

  16. Nuclear new-build - Status and Outlook from a German utility perspective

    International Nuclear Information System (INIS)

    Koenig, Ruediger; Lefhalm, Cord-H.

    2009-01-01

    Full text: As one of the Top 5 utilities in Europe, Rheinisch-Westfaelisches Elektrizitaetswerk AG, FWB: RW, RWE, operates a diversified generating capacity of about 45 GW; RWE Power alone generates over 30 GW. Besides a share of approximately 20% nuclear power, a large proportion of the generating base is in lignite and hard coal. RWE has an ambitious, Euro10 bn newbuild program of about 10 GW modern fossil fired plants and further expansion plans across Europe. By 2012, RWE intends to invest between Euro 15 and 20 bn outside Germany.The European Union has a challenging policy to increase the share of renewables, improve energy efficiency, and reduce greenhouse gases by 2020. At the same time, ageing power plants need to be replaced. This requires an enormous investment program across Europe. Nuclear power therefore, as a proven technology with low lifecycle carbon emissions and reasonable lifecycle cost, is a crucial contributor to achieve Europe's 2020 goals. Accordingly, most European countries have started or are planning to expand their nuclear generating base by lifetime extension, capacity upgrades, and newbuild projects. Germany is one of the few countries where the Government has not yet adopted a pro-nuclear policy. Instead, the law of the land still forces early plant closures. Against this background, RWE is determined to reduce its CO 2 exposure and grow internationally; work towards preserving nuclear energy in Germany; expand its nuclear energy-based generation portfolio in other markets, especially UK and CSEE. As a pioneer in the civilian nuclear industry, RWE can build on a wealth of experience for engaging in new nuclear projects. We have established a set of strict guidelines with which we evaluate project opportunities, starting with the fundamental requirement that, beyond any regulatory requirements, safety must be guaranteed according to RWE's high standards. On this basis, RWE has been successfully able to engage in two of the first

  17. Key issues for the control of refueling outage duration and costs in PWR nuclear power plants

    International Nuclear Information System (INIS)

    Degrave, C.; Martin-Onraet, M.

    2000-01-01

    For several years, EDF, within the framework of the CIDEM project and in collaboration with some German Utilities, has undertaken a detailed review of the operating experience both of its own NPP and of foreign units, in order to improve the performances of future units under design, particularly the French-German European Pressurized Reactor (EPR) project. This review made it possible to identify the key issues allowing to decrease the duration of refueling and maintenance outages. These key issues can be classified in 3 categories: Design; Maintenance and Logistic Support; Outage Management. Most key issues in the design field and some in the logistic support field have been studied and could be integrated into the design of any future PWR unit, as for the EPR project. Some of them could also be adapted to current plants, provided they are feasible and profitable. The organization must be tailored to each country, utility or period: it widely depends on the power production environment, particularly in a deregulation context. (author)

  18. Pathfinder irradiation of advanced fuel (Th/U mixed oxide) in a power reactor

    International Nuclear Information System (INIS)

    Brant Pinheiro, R.

    1993-01-01

    Within the joint Brazilian-German cooperative R and D Program on Thorium Utilization in Pressurized Water Reactors carried out from 1979 to 1988 by Nuclebras/CDTN, KFA-Juelich, Siemens/KWU and NUKEM, a pathfinder irradiation of Th/U mixed oxide fuel in the Angra 1 nuclear power reactor was planned. The objectives of this irradiation testing, the irradiation strategy, the work performed and the status achieved at the end of the joint Program are presented. (author)

  19. Zur Darstellung von Synchronie und Diachronie des Vokalismus im Deutschen (On the Synchronic and Diachronic Representation of Vocalization in German)

    Science.gov (United States)

    Pauly, Peter

    1974-01-01

    A combination matrix could be very useful to illustrate the synchronic and diachronic representation of German diphthongs. Examples are provided. It is further suggested that such a matrix could be utilized for phonological research in the areas of historical linguistics, sociolinguistics and dialectology. (Text is in German.) (DS)

  20. Utilization of Model Predictive Control to Balance Power Absorption Against Load Accumulation

    Energy Technology Data Exchange (ETDEWEB)

    Abbas, Nikhar [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Tom, Nathan M [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-06-03

    Wave energy converter (WEC) control strategies have been primarily focused on maximizing power absorption. The use of model predictive control strategies allows for a finite-horizon, multiterm objective function to be solved. This work utilizes a multiterm objective function to maximize power absorption while minimizing the structural loads on the WEC system. Furthermore, a Kalman filter and autoregressive model were used to estimate and forecast the wave exciting force and predict the future dynamics of the WEC. The WEC's power-take-off time-averaged power and structural loads under a perfect forecast assumption in irregular waves were compared against results obtained from the Kalman filter and autoregressive model to evaluate model predictive control performance.

  1. Multi-level lobbying in the EU: The case of the Renewables Directive and the German energy industry

    Energy Technology Data Exchange (ETDEWEB)

    Ydersbond, Inga Margrete

    2012-11-01

    This study examines the lobbying strategies employed by the interest organizations of Germany's energy industries in the process leading up to the EU's Renewable Energy Directive. How did they lobby, and what does this reveal about their perceptions of power relations in the EU? This report focuses on the most controversial part of the Directive: legal prescriptions for support mechanisms to increase the production of renewable energy in Europe. The utilities and the renewables industries disagreed deeply, with the utilities industry favouring an EU-wide green certificate scheme, while the renewables industry pressed for national feed-in tariffs. Nine interest organizations representing these sectors, five German and four at the EU level, serve as cases in this study. Expectations as to lobbying behaviour based on the two theories/theory perspectives of liberal intergovernmentalism (LI) and multi-level governance (MLG) are formulated and tested in a most-likely case design. Result: observations are better described by the MLG perspective than by LI.(auth)

  2. Multi-level lobbying in the EU: The case of the Renewables Directive and the German energy industry

    Energy Technology Data Exchange (ETDEWEB)

    Ydersbond, Inga Margrete

    2012-11-01

    This study examines the lobbying strategies employed by the interest organizations of Germany's energy industries in the process leading up to the EU's Renewable Energy Directive. How did they lobby, and what does this reveal about their perceptions of power relations in the EU? This report focuses on the most controversial part of the Directive: legal prescriptions for support mechanisms to increase the production of renewable energy in Europe. The utilities and the renewables industries disagreed deeply, with the utilities industry favouring an EU-wide green certificate scheme, while the renewables industry pressed for national feed-in tariffs. Nine interest organizations representing these sectors, five German and four at the EU level, serve as cases in this study. Expectations as to lobbying behaviour based on the two theories/theory perspectives of liberal intergovernmentalism (LI) and multi-level governance (MLG) are formulated and tested in a most-likely case design. Result: observations are better described by the MLG perspective than by LI.(auth)

  3. The program for Central and Eastern Europe organized by the German Federal Ministry for the Environment

    International Nuclear Information System (INIS)

    Gelfort, E.; Wolf, J.; Weil, L.

    1996-01-01

    One of the main objectives of the German Federal Ministry for the Environment, within the overall concept of the Federal Government to help establish democracy and a social market economy in Eastern Europe, is to contribute to improving the safety of nuclear power plants. Safety evaluations of Soviet-type reactors in the former German Democratic Republic have given rise to findings since 1990 which resulted in qualified cooperation especially in Russia and Ukraine. These activities mainly serve to strengthen the role of supervisory authorities in the interest of nuclear safety, and to make available technical inspection systems for nuclear power plants. German experts also conducted safety analyses and radioactivity measurements in situ. The financial expenditure between 1990 and 1995 totaled approx. DM 150 million. The money was spent on some 75 different projects for which contracts were awarded to qualified German firms. All measures, from analyses to the provision of equipment to training seminars, serve the purpose of providing help towards self-help, together with an adequate transfer of know-how. (orig.) [de

  4. Risk premiums in the German day-ahead Electricity Market

    International Nuclear Information System (INIS)

    Viehmann, Johannes

    2011-01-01

    This paper conducts an empirical analysis of risk premiums in the German day-ahead Electricity Wholesale Market. We compare hourly price data of the European Energy Exchange (EEX) auction and of the continuous over-the-counter (OTC) market which takes place prior to the EEX auction. Data provided by the Energy Exchange Austria (EXAA) has been used as a snapshot of the OTC market two hours prior to the EEX auction. Ex post analysis found market participants are willing to pay both significant positive and negative premiums for hourly contracts. The largest positive premiums were paid for high demand evening peak hours on weekdays during winter months. By contrast, night hours on weekends featuring lowest demand levels display negative premiums. Additionally, ex ante analysis found a strong positive correlation between the expected tightness of the system and positive premiums. For this purpose, a tightness factor has been introduced that includes expectations of fundamental factors such as power plant availability, wind power production and demand. Hence, findings by can be supported that power traders in liberalised markets behave like risk-averse rational economic agents. - Research highlights: →Analysis of hourly risk premiums in the German day-ahead Electricity Wholesale Market. →Market participants are willing to pay both significant positive and negative premiums for hourly contracts. →A strong correlation exists between the expected tightness of the power system and premiums.

  5. Ionic Liquids for Utilization of Waste Heat from Distributed Power Generation Systems

    Energy Technology Data Exchange (ETDEWEB)

    Joan F. Brennecke; Mihir Sen; Edward J. Maginn; Samuel Paolucci; Mark A. Stadtherr; Peter T. Disser; Mike Zdyb

    2009-01-11

    The objective of this research project was the development of ionic liquids to capture and utilize waste heat from distributed power generation systems. Ionic Liquids (ILs) are organic salts that are liquid at room temperature and they have the potential to make fundamental and far-reaching changes in the way we use energy. In particular, the focus of this project was fundamental research on the potential use of IL/CO2 mixtures in absorption-refrigeration systems. Such systems can provide cooling by utilizing waste heat from various sources, including distributed power generation. The basic objectives of the research were to design and synthesize ILs appropriate for the task, to measure and model thermophysical properties and phase behavior of ILs and IL/CO2 mixtures, and to model the performance of IL/CO2 absorption-refrigeration systems.

  6. German study on the risks of nuclear power plants

    International Nuclear Information System (INIS)

    Wollny, V.

    1987-01-01

    The 'Deutsche Risikostudie Kernkraftwerke', DRS, (German study on the risks of nuclear plants) calculates a frequency of 1/10000 years (i.e. once in 10000 years of reactor operation) for the event of insufficient cooling of the reactor core occurring. The resulting collective risk is put at approximately 10 deaths per year for 25 plants. As the explanations show, the error margin of such a risk statement is enormous. Moreover, much seems to indicate that the risk was underrated. Apart from this, risk analyses are of doubtful value in the decision process for or against the introduction of large-scale technologies. They cannot replace the individual decision of all concerned. (orig./HSCH) [de

  7. Wind Power Utilization Guide.

    Science.gov (United States)

    1981-09-01

    The expres- sions for the rotor torque for a Darrieus machine can be found in Reference 4.16. The Darrieus wind turbine offers the following... turbine generators, wind -driven turbines , power conditioning, wind power, energy conservation, windmills, economic ana \\sis. 20 ABS 1"ACT (Conti,on... turbines , power conditioning requirements, siting requirements, and the economics of wind power under different conditions. Three examples are given to

  8. The economic value of accurate wind power forecasting to utilities

    Energy Technology Data Exchange (ETDEWEB)

    Watson, S J [Rutherford Appleton Lab., Oxfordshire (United Kingdom); Giebel, G; Joensen, A [Risoe National Lab., Dept. of Wind Energy and Atmospheric Physics, Roskilde (Denmark)

    1999-03-01

    With increasing penetrations of wind power, the need for accurate forecasting is becoming ever more important. Wind power is by its very nature intermittent. For utility schedulers this presents its own problems particularly when the penetration of wind power capacity in a grid reaches a significant level (>20%). However, using accurate forecasts of wind power at wind farm sites, schedulers are able to plan the operation of conventional power capacity to accommodate the fluctuating demands of consumers and wind farm output. The results of a study to assess the value of forecasting at several potential wind farm sites in the UK and in the US state of Iowa using the Reading University/Rutherford Appleton Laboratory National Grid Model (NGM) are presented. The results are assessed for different types of wind power forecasting, namely: persistence, optimised numerical weather prediction or perfect forecasting. In particular, it will shown how the NGM has been used to assess the value of numerical weather prediction forecasts from the Danish Meteorological Institute model, HIRLAM, and the US Nested Grid Model, which have been `site tailored` by the use of the linearized flow model WA{sup s}P and by various Model output Statistics (MOS) and autoregressive techniques. (au)

  9. Word order in the Germanic languages

    DEFF Research Database (Denmark)

    Holmberg, Anders; Rijkhoff, Jan

    1998-01-01

    The Germanic branch of Indo-European consists of three main groups (Ruhlen 1987: 327):- East Germanic: Gothic, Vandalic, Burgundian (all extinct);- North Germanic (or: Scandinavian): Runic (extinct), Danish, Swedish, Norwegian, Icelandic, Faroese;- West Germanic: German, Yiddish, Luxembourgeois, ...

  10. The German reactor safety study

    International Nuclear Information System (INIS)

    Birkhofer, A.

    1980-01-01

    The most important results of the German risk study of a nuclear power plant equipped with a pressurized water reactor were published in August 1979. The main volume of the study with the approach used and the results elaborated has been available for reference since late 1979. Eight technical volumes contain detailed descriptions and documentations of the investigations carried out. The reference facility used as a basis for the technical plant studies was unit B of the Biblis Nuclear Power Station, a KWU PWR of 3750 MW thermal power. This contribution provides more detailed explanations of the methods and the results of the risk study illustrated by examples. The description refers to accident categories and categories of radioactivity releases, probabilities of specific sequences of accident events, and the damage associated with core meltdown accidents as a function of various types of failure. For purposes of evaluation and application of the results the limits in the basic assumptions of the study are referred to. (orig./HP) [de

  11. Thermal power sludge – properties, treatment, utilization

    Directory of Open Access Journals (Sweden)

    Martin Sisol

    2005-11-01

    Full Text Available In this paper a knowledge about properties of thermal power sludge from coal combustion in smelting boilers is presented. The physical and technological properties of slag – granularity, density, specific, volume and pouring weight, hardness and decoupling – together with chemical properties influence its exploitation. The possibility of concentrating the Fe component by the mineral processing technologies (wet low-intenzity magnetic separation is verified. An industrial use of the slag in civil engineering, e.g. road construction, was realised. The slag-fly ashes are directly utilized in the cement production as a substitute of a part of natural raw materials. For the use of slag as the stoneware in the road construction, all the criteria are fulfilled.

  12. The German Energiewende – History and status quo

    International Nuclear Information System (INIS)

    Hake, Jürgen-Friedrich; Fischer, Wolfgang; Venghaus, Sandra; Weckenbrock, Christoph

    2015-01-01

    Industrialized nations rely heavily on fossil fuels as an economic factor. Energy systems therefore play a special part in realizing visions of future sustainable societies. In Germany, successive governments have specified their ideas on sustainable development and the related energy system. Detailed objectives make the vision of the Energiewende – the transformation of the energy sector – more concrete. Many Germans hope that the country sets a positive example for other nations whose energy systems also heavily rely on fossil fuels. A glance at the historical dimensions of this transformation shows that the origins of German energy objectives lie more than thirty years in the past. The realization of these goals has not been free from tensions and conflicts. This article aims at explaining Germany's pioneering role in the promotion of an energy system largely built on renewable energy sources by disclosing the drivers that have successively led to the Energiewende. To reveal these drivers, the historical emergence of energy politics in Germany was analyzed especially with respect to path dependencies and discourses (and their underlying power relations) as well as exogenous events that have enabled significant shifts in the political energy strategy of Germany. - Highlights: • Analysis of key drivers of the German Energiewende. • Enabled by special constellation of political developments and external incidents. • Resulted in changing power constellations and discourse dynamics. • Contended political process spurred strong economic leaders to support renewables. • Their impact drove all political parties towards nuclear phase-out and Energiewende.

  13. Affairs of power: Restructuring California's electric utility industry, 1968-1998

    Science.gov (United States)

    Myers, William Allan

    This dissertation studies the process of change in the political economy of electric utilities. Following two decades of continual growth during the nation's post-World War Two economic and population boom, the electric power industry confronted increasing challenges to its traditional operating practices and cultural values, nowhere with greater intensity than in California. Pressure for change came from outside forces who opposed utilities' business practices, assailed their traditional vertically-integrated structure, questioned the political assumptions that sustained their monopoly status, and ultimately wrested away access to the once tightly controlled technology of electric generation and transmission. Because managers of both investor-owned and publicly-owned utilities continued to rely upon long-standing economic and technical assumptions derived from deeply held cultural values sustained by decades of business success, they were rendered unable to comprehend and unwilling to accommodate change. Persistent mistrust between the publicly-owned and privately-owned sectors further weakened the industry's ability to work cooperatively in the face of crucial challenges. Thus encumbered by endemic structural jealousy, technological path dependency, and organizational stasis, the industry did not respond with sufficient innovation to new social values and altering economic conditions, ultimately resulting in the discarding of the old political economy of regulated monopolism. Five precepts of economic history are identified as crucial elements of the process of change. First, the tension between protection and entry, and the related issue of access to technology, contributes to creation and modification of the political economy in which economic institutions function. Second, submission to governmental regulatory powers allows certain industries to control entry, restrict access, and protect themselves from the dynamics of competitive change. Third, an

  14. Ten years of KRB Gundremmingen demonstration power station

    International Nuclear Information System (INIS)

    Facius, H. von; Ettemeyer, R.

    1976-01-01

    In August 1976 the first large nuclear power station in the Federal Republic, the KRB Gundremmingen plant with a net power of 237 MWe, has been in operation ten years. The construction of KRB as a demonstration plant was a major step forward on the way to the economic utilization of nuclear power for German utilities. Design and operation of the plant have decisively influenced the further development of the technology of light water reactors in the Federal Republic. Unlike the Kahl Experimental Nuclear Power Station (VAK), which was a test facility designed to generate experience and to train personnel, the decision to build KRB from the outset was conditional upon the fulfillment of economic criteria. Here are some of the aspects in which KRB has greatly influenced the development of nuclear power station technology: first application of internal steam-water separation instead of a steam drum with a water content of the steam of less than 1%; construction of a reactor buildung with all the necessary safety factors; solution of the corrosion and erosion problems linked with the use of a saturated steam turbine; special measures taken to prevent the turbine from speeding up due to post-evaporation effects after shutdown. Detailed comments are devoted to the subjects of availability, causes of failure and repair work. (orig.) [de

  15. Asymmetric Mutual Social Perception of Austrians and Germans: A Social Identity Approach Assessing Implicit and Explicit Attitudes

    Directory of Open Access Journals (Sweden)

    Walter Renner

    2014-07-01

    Full Text Available Whereas Austrians tend to perceive Germans as "competent but cold", Germans tend to see Austrians as "incompetent but nice" in the sense of Fiske's Stereotype Content Model. With respect to the unequal distribution of power between Austria and Germany, which outnumbers Austria by approximately the tenfold population, Social Identity Theory (SIT predicts that Austrians will tend to devalue Germans, attempting to preserve their self-esteem and cultural identity, whereas Germans will perceive Austrians more positively. We tested this expectation with N = 31 Austrian and N = 49 German students at an Austrian university. Our hypotheses of asymmetrical mutual attitudes and massive devaluation of Germans by Austrians were confirmed by the Implicit Association Test, whereas on adjective lists as an explicit measure, Austrians described Germans more favourably, obviously out of a desire not to appear prejudiced. The results support SIT and have important implications for the development of Austrian academic education.

  16. Analysis of oxy-fuel combustion power cycle utilizing a pressurized coal combustor

    OpenAIRE

    Gazzino, Marco; Hong, Jongsup; Chaudhry, Gunaranjan; Brisson II, John G; Field, Randall; Ghoniem, Ahmed F

    2009-01-01

    Growing concerns over greenhouse gas emissions have driven extensive research into new power generation cycles that enable carbon dioxide capture and sequestration. In this regard, oxy-fuel combustion is a promising new technology in which fuels are burned in an environment of oxygen and recycled combustion gases. In this paper, an oxy-fuel combustion power cycle that utilizes a pressurized coal combustor is analyzed. We show that this approach recovers more thermal energy from the flue gases...

  17. SOFT POWER: TRAINING OF VET TEACHERS AND TRAINERS (RESULTS OF THE RUSSIAN-GERMAN COOPERATION

    Directory of Open Access Journals (Sweden)

    E. Yu. Esenina

    2017-01-01

    Full Text Available Introduction. Nowadays, in Russia the system of interaction between educational institutions and enterprises-employers in training of specialists is being built again after more than a twenty-year period of dissociation. Sharing experiences with other countries on networking and strengthening of education relations with production is very useful for establishing this process. The aim of the publication is to present the results of the Russian-German cooperation in the field of preparation of the qualified pedagogical staff for the system of vocational education as one of the key conditions for ensuring the proper quality of vocational education. Methodology and research methods. The methods involve the methodology of comparative research; methods of collecting empirical information; conceptual and terminological analysis, interpretation, modeling, and problem method. Results. The approaches to preparation of pedagogical staff of the VET system in Germany and Russia are revealed and compared. Specifics of the German model are shown: existence of several skill levels of teachers of vocational education, distribution of zones of their responsibility, variability of providers of additional education, its market nature and minimum participation in its regulation of the state. Features of the modern Russian theory and training experience of instructors of vocational training are described. Despite the existing distinctions of systems of professional education of two countries, the similarity of the Russian and German methods of vocational education is observed. The conclusion is drawn on a community of requirements imposed in Germany and Russia to category of the workers who are carrying out staff training for manufacturing sectors. It is confirmed by the German experts on the basis of the analysis of the standard «Teacher of Vocational Education, Professional Education and Additional Professional Education». Also, the standard was checked and

  18. Green power programs in Canada : 2002 : Overview of Government green power policies, utility green power development programs, green power and certificate marketing initiatives, and their benefits

    International Nuclear Information System (INIS)

    Bramley, M.; Boustie, S.; Vadgama, J.; Wieler, C.; Pape-Salmon, A.; Holmes, R.

    2003-11-01

    Green power is generally defined as electricity produced from renewable sources, and whose production has low adverse impacts on the environment, human health and communities. Green power has near-zero greenhouse gas (GHG) emissions and includes sources such as wind, hydro, and solar power. Green power offers several environmental benefits, as well as the enhancement of energy security, regional development, economic diversification and the creation of skilled jobs. There are four categories of programs related to green power development in Canada: government green power policies, utility green power development programs, green power marketing initiatives, and green power certificate marketing initiatives. Most of the activities associated with these four categories in 2002 were discussed in this report. However, difficulties with quantification prevented the inclusion of some green power activities in the report, such as (1) the generation of green power not certified or identified by the generator as green power, (2) industry or residential self-generation, (3) net metering, and (4) small government programs. Each category was presented in detail. The information included in the report was based on surveys sent to each program proponent. Follow-up communications and other publicly available information was also included. New programs operating in 2003 or currently under development were listed. refs., 8 tabs

  19. The West German Chancellor and the Study of Comparative Executives.

    Science.gov (United States)

    Berry, Phyllis

    1989-01-01

    Describes how the West German parliamentary government, although originally modeled after the British parliament, is different because it allows for separation of powers similar to the U.S. government. Illustrates how a teacher can use an examination of the executive office to describe governmental relationships. (GG)

  20. Development of LiDAR measurements for the German offshore test site

    International Nuclear Information System (INIS)

    Rettenmeier, A; Kuehn, M; Waechter, M; Rahm, S; Mellinghoff, H; Siegmeier, B; Reeder, L

    2008-01-01

    The paper introduces the content of the recently started joint research project 'Development of LiDAR measurements for the German Offshore Test Site' which has the objective to support other research projects at the German offshore test site 'alpha ventus'. The project has started before the erection of the offshore wind farm and one aim is to give recommendations concerning LiDAR technology useable for offshore measurement campaigns and data analysis. The work is organized in four work packages. The work package LiDAR technology deals with the specification, acquisition and calibration of a commercial LiDAR system for the measurement campaigns. Power curve measurements are dedicated to power curve assessment with ground-based LiDAR using standard statistical methods. Additionally, it deals with the development of new methods for the measurement of non-steady short-term power curves. Wind field research aims at the development of wake loading simulation methods of wind turbines and the exploration of loading control strategies and nacelle-based wind field measurement techniques. Finally, dissemination of results to the industry takes place in work package Technology transfer

  1. The German experience with grid-connected PV-systems

    International Nuclear Information System (INIS)

    Erge, T.; Hoffmann, V.U.; Kiefer, K.

    2001-01-01

    Grid-connected photovoltaics experienced increasing attention in Germany in recent years and are expected to face a major boost at the beginning of the new millennium. Highlights like the German 100,000-Roofs-Solar-Programme, PV programmes at schools financed by utilities and governments (e.g. 'SONNEonline' by PreussenElektra, 'Sonne in der Schule' by BMWi and 'Sonne in der Schule' by Bayernwerk) and large centralised installations of MW size ('Neue Messe Munchen' by Bayernwerk and 'Energiepark Mont-Cenis' by state Nordrhein-Westfalen, Stadtwerke Herne and European Union) count for the potential of grid-connected PV. Today in Germany a typical grid-connected PV installation of 1 kW nominal power produces average annual energy yields of 700 kWh (dependent on location and system components) and shows a high operating availability. The price per kWh from PV installations is still significantly higher than the price for conventional energy, but new funding schemes and cost models (like the large increase of feed-in tariff in Germany due to the Act on Granting Priority to Renewable Energy Sources in 2000) give optimism about the future. (Author)

  2. Multi-utility services, the key to success; Mit Multi-Utility-Dienstleistungen zum Erfolg

    Energy Technology Data Exchange (ETDEWEB)

    Lowak, M. [MVV Energie AG, Mannheim (Germany). Bereich Energiedienstleistungen

    2002-04-01

    The article summarizes essential aspects of successful management strategies, including cross selling, of the Mannheim-based multi-utility enterprise MVV Energie AG, which developed a successful portfolio of innovative products and services. (orig./CB) [German] Aus ihrem Kerngeschaeft als Verteilerunternehmen hat die MVV Energie AG, Mannheim, ein umfassendes Portfolio innovativer Produkte und Dienstleistungen entwickelt. (orig./CB)

  3. Autopsy issues in German Federal Republic transplantation legislation until 1997.

    Science.gov (United States)

    Schweikardt, Christoph

    2014-01-01

    This article analyzes the relevance of autopsy issues for German Federal Republic transplantation legislation until 1997 against the background of legal traditions and the distribution of constitutional legislative powers. It is based on Federal Ministry of Justice records and German Parliament documents on transplantation legislation. Transplantation and autopsy legislation started with close ties in the 1970s. Viewing transplantation legislation as relevant for future autopsy regulation contributed to the decision to stall transplantation legislation, because the interests of the federal government and the medical profession converged to avoid subsequent restrictions on the practice of conducting autopsies and procuring tissues for transplantation. Sublegal norms were insufficient for the prosecution of the organ trade and area-wide transplantation regulation after the reunification of Germany. In contrast to autopsy issues, legislative power for transplantation issues was extended to the federal level by an amendment to the constitution, allowing decision making for Germany as a whole.

  4. Integrated Simulation Development and Decision Support Tool-Set for Utility Market and Distributed Solar Power Generation Electricore, Inc.

    Energy Technology Data Exchange (ETDEWEB)

    Daye, Tony [Green Power Labs (GPL), San Diego, CA (United States)

    2013-09-30

    This project will enable utilities to develop long-term strategic plans that integrate high levels of renewable energy generation, and to better plan power system operations under high renewable penetration. The program developed forecast data streams for decision support and effective integration of centralized and distributed solar power generation in utility operations. This toolset focused on real time simulation of distributed power generation within utility grids with the emphasis on potential applications in day ahead (market) and real time (reliability) utility operations. The project team developed and demonstrated methodologies for quantifying the impact of distributed solar generation on core utility operations, identified protocols for internal data communication requirements, and worked with utility personnel to adapt the new distributed generation (DG) forecasts seamlessly within existing Load and Generation procedures through a sophisticated DMS. This project supported the objectives of the SunShot Initiative and SUNRISE by enabling core utility operations to enhance their simulation capability to analyze and prepare for the impacts of high penetrations of solar on the power grid. The impact of high penetration solar PV on utility operations is not only limited to control centers, but across many core operations. Benefits of an enhanced DMS using state-of-the-art solar forecast data were demonstrated within this project and have had an immediate direct operational cost savings for Energy Marketing for Day Ahead generation commitments, Real Time Operations, Load Forecasting (at an aggregate system level for Day Ahead), Demand Response, Long term Planning (asset management), Distribution Operations, and core ancillary services as required for balancing and reliability. This provided power system operators with the necessary tools and processes to operate the grid in a reliable manner under high renewable penetration.

  5. Present and future nuclear power financing schemes

    International Nuclear Information System (INIS)

    Diel, R.

    1977-01-01

    The financial requirement for nuclear power plants in the Federal Republic of Germany for the period up until 1985 was estimated to run up to some DM 100 billion already in the Nuclear Energy Study published by the Dresdner Bank in 1974. This figure is not changed in any way by the reduction the nuclear power program has suffered in the meantime, because the lower requirement for investment capital is more than offset by the price increases that have occurred meanwhile. A capital requirement in the order of DM 100 billion raises major problems for the power producing industry and the banks which, however, are not going to hamper the further expansion of nuclear power, because new financing schemes have been specially developed for the nuclear field. They include financing by leasing, the use of funds from real estate credit institutions for long term financing, borrowing of long term funds in the Euro market, and financing through subsidiaries of the utilities. The new financing schemes also apply to the large financial requirement associated with the nuclear fuel cycle, waste management in particular. In this sector the utilities agree to bear the economic risk of the companies implementing the respective projects. Accordingly, financing will not entail any major difficulties. Another area of great importance is export financing. The German-Brazilian nuclear agreement is a model of this instrument. (orig.) [de

  6. Utilizing Solar Power Technologies for On-Orbit Propellant Production

    Science.gov (United States)

    Fikes, John C.; Howell, Joe T.; Henley, Mark W.

    2006-01-01

    The cost of access to space beyond low Earth orbit may be reduced if vehicles can refuel in orbit. The cost of access to low Earth orbit may also be reduced by launching oxygen and hydrogen propellants in the form of water. To achieve this reduction in costs of access to low Earth orbit and beyond, a propellant depot is considered that electrolyzes water in orbit, then condenses and stores cryogenic oxygen and hydrogen. Power requirements for such a depot require Solar Power Satellite technologies. A propellant depot utilizing solar power technologies is discussed in this paper. The depot will be deployed in a 400 km circular equatorial orbit. It receives tanks of water launched into a lower orbit from Earth, converts the water to liquid hydrogen and oxygen, and stores up to 500 metric tons of cryogenic propellants. This requires a power system that is comparable to a large Solar Power Satellite capable of several 100 kW of energy. Power is supplied by a pair of solar arrays mounted perpendicular to the orbital plane, which rotates once per orbit to track the Sun. The majority of the power is used to run the electrolysis system. Thermal control is maintained by body-mounted radiators; these also provide some shielding against orbital debris. The propellant stored in the depot can support transportation from low Earth orbit to geostationary Earth orbit, the Moon, LaGrange points, Mars, etc. Emphasis is placed on the Water-Ice to Cryogen propellant production facility. A very high power system is required for cracking (electrolyzing) the water and condensing and refrigerating the resulting oxygen and hydrogen. For a propellant production rate of 500 metric tons (1,100,000 pounds) per year, an average electrical power supply of 100 s of kW is required. To make the most efficient use of space solar power, electrolysis is performed only during the portion of the orbit that the Depot is in sunlight, so roughly twice this power level is needed for operations in sunlight

  7. The European nuclear power industry: Restructuring for combined strength and worldwide leadership

    International Nuclear Information System (INIS)

    Forsberg, C.W.; Norman, R.E.; Reich, W.J.; Hill, L.J.

    1993-01-01

    The European nuclear power industry is being restructured from an industry drawn along national lines to a European-wide industry. This, in part, reflects growth of the European Economic Community, but it also reflects changes in the international nuclear power industry. The objectives of the participants, beyond better integration of the nuclear industry in Western Europe, are to (1) obtain European leadership of the worldwide commercial nuclear power industry, (2) improve medium- and long-term safety of Eastern Europe and the former Soviet Union (FSU) power reactors, and (3) reduce domestic concerns about nuclear power. The activities to achieve these goals include (1) formation of Nuclear Power International (a joint venture of the German and French nuclear power plant vendors for design and construction of nuclear power plants), (2) formation of a utility group to forge agreement throughout Europe on what the requirements are for the next generation of nuclear power plants, and (3) agreement by regulators in multiple European countries to harmonize regulations. This is to be achieved before the end of the decade. These changes would allow a single design of nuclear power plant to be built anywhere in Europe. The creation of European-wide rules (utility requirements, engineering standards, and national regulations) would create strong economic and political forces for other European countries (Eastern Europe and FSU) to meet these standards

  8. The European nuclear power industry: Restructuring for combined strength and worldwide leadership

    Energy Technology Data Exchange (ETDEWEB)

    Forsberg, C.W.; Norman, R.E.; Reich, W.J.; Hill, L.J.

    1993-06-18

    The European nuclear power industry is being restructured from an industry drawn along national lines to a European-wide industry. This, in part, reflects growth of the European Economic Community, but it also reflects changes in the international nuclear power industry. The objectives of the participants, beyond better integration of the nuclear industry in Western Europe, are to (1) obtain European leadership of the worldwide commercial nuclear power industry, (2) improve medium- and long-term safety of Eastern Europe and the former Soviet Union (FSU) power reactors, and (3) reduce domestic concerns about nuclear power. The activities to achieve these goals include (1) formation of Nuclear Power International (a joint venture of the German and French nuclear power plant vendors for design and construction of nuclear power plants), (2) formation of a utility group to forge agreement throughout Europe on what the requirements are for the next generation of nuclear power plants, and (3) agreement by regulators in multiple European countries to harmonize regulations. This is to be achieved before the end of the decade. These changes would allow a single design of nuclear power plant to be built anywhere in Europe. The creation of European-wide rules (utility requirements, engineering standards, and national regulations) would create strong economic and political forces for other European countries (Eastern Europe and FSU) to meet these standards.

  9. The German fast breeder programme and fuel cycle activities

    International Nuclear Information System (INIS)

    Marth, W.; Lahr, H.

    1982-01-01

    After a review of the German experimental power plant KNK II, the present status of the prototype SNR 300 project is described, including its political and licensing aspects. Breeder cooperation with France is gaining momentum. Research and development in core physics and fuel development and implications for the reprocessing of spent fuel are discussed. (author)

  10. Utilization of water soluble plastics for radiological control within nuclear power plants

    International Nuclear Information System (INIS)

    Smith, R.J.; Deltete, C.P.; Homyk, W.A.; Kasprzak, L.; Robinson, P.J.

    1989-01-01

    The utilization of plastic products for radioactive contamination control within nuclear power facilities currently results in relatively large volumes of waste requiring disposal as low-level radioactive waste. The utilization of a polymer resin product that possesses comparable physical attributes to currently utilized plastic materials, but which is water soluble, has significant potential to reduce the volume of plastic waste requiring disposal as radwaste. Such a volume reduction will reduce overall plant )ampersand M costs, reduce the overall waste volume allocation utilization, and improve the regulatory perception of any plant realizing a volume reduction through plastic source minimization. This potential reduction in waste volume (and associated availability of the Low-level Waste Policy Amendments Act disposal allocation for other purposes), combined with potential economic benefits summarized above, has led to the undertaking of a detailed evaluation, presented in this paper

  11. German translation of the Alberta context tool and two measures of research use: methods, challenges and lessons learned

    Science.gov (United States)

    2013-01-01

    Background Understanding the relationship between organizational context and research utilization is key to reducing the research-practice gap in health care. This is particularly true in the residential long term care (LTC) setting where relatively little work has examined the influence of context on research implementation. Reliable, valid measures and tools are a prerequisite for studying organizational context and research utilization. Few such tools exist in German. We thus translated three such tools (the Alberta Context Tool and two measures of research use) into German for use in German residential LTC. We point out challenges and strategies for their solution unique to German residential LTC, and demonstrate how resolving specific challenges in the translation of the health care aide instrument version streamlined the translation process of versions for registered nurses, allied health providers, practice specialists, and managers. Methods Our translation methods were based on best practices and included two independent forward translations, reconciliation of the forward translations, expert panel discussions, two independent back translations, reconciliation of the back translations, back translation review, and cognitive debriefing. Results We categorized the challenges in this translation process into seven categories: (1) differing professional education of Canadian and German care providers, (2) risk that German translations would become grammatically complex, (3) wordings at risk of being misunderstood, (4) phrases/idioms non-existent in German, (5) lack of corresponding German words, (6) limited comprehensibility of corresponding German words, and (7) target persons’ unfamiliarity with activities detailed in survey items. Examples of each challenge are described with strategies that we used to manage the challenge. Conclusion Translating an existing instrument is complex and time-consuming, but a rigorous approach is necessary to obtain instrument

  12. Making the grid the backup: Utility applications for fuel cell power

    Energy Technology Data Exchange (ETDEWEB)

    Eklof, S.L. [Sacramento Municipal Utility District (SMUD), Sacramento, CA (United States)

    1996-12-31

    Fuel cells are recognized as a versatile power generation option and accepted component of SMUD`s ART Program. SMUD has received wide support and recognition for promoting and implementing fuel cell power plants, as well as other innovative generation, based primarily on technological factors. Current economic and technical realities in the electric generation market highlight other important factors, such as the cost involved to develop a slate of such resources. The goal now is to develop only those select quality resources most likely to become commercially viable in the near future. The challenge becomes the identification of candidate technologies with the greatest potential, and then matching the technologies with the applications that will help to make them successful. Utility participation in this development is critical so as to provide the industry with case examples of advanced technologies that can be applied in a way beneficial to both the utility and its customers. The ART resource acquisitions provide the experience base upon which to guide this selection process, and should bring about the cost reductions and reliability improvements sought.

  13. Explanatory models of addictive behaviour among native German, Russian-German, and Turkish youth.

    Science.gov (United States)

    Penka, S; Heimann, H; Heinz, A; Schouler-Ocak, M

    2008-01-01

    In Germany, the public system of addiction treatment is used less by migrants with addictive disorders than by their non-migrant counterparts. To date, the literature has focused primarily on language, sociocultural factors, and residence status when discussing access barriers to this part of the health care system. However, little attention has been paid to cultural differences in explanatory models of addictive behaviour. This is surprising when we consider the important role played by popular knowledge in a population's perceptions of and responses to illnesses, including their causes, symptoms, and treatment. In the present study, we examined explanatory models of addictive behaviour and of mental disorders in 124 native German und Russian-German youth and compared these models to those observed in an earlier study of 144 German and Turkish youth. We employed the free listing technique German and to compile the terms that participating subjects used to describe addictive behaviour. Subsequently, we examined how a subset of our study population assigned these terms to the respective disorders by means of the pile sort method. Although the explanatory models used by the German and Russian-German youth in our study were surprisingly similar, those employed by Turkish youth did not make any fundamental distinction between illegal and legal drugs (e.g. alcohol and nicotine). German and Russian-German youth regarded eating disorders as "embarrassing" or "disgraceful", but Turkish youth did not. Unlike our German and Russian-German subjects, the Turkish youth did not classify eating disorders as being addictive in nature. Moreover, medical concepts crucial to a proper understanding of dependence disorders (e.g. the term "physical dependence") were characterised by almost half of our Turkish subjects as useless in describing addictions. These findings show that it is impossible to translate medical or everyday concepts of disease and treatment properly into a different

  14. High-Temperature Reactor For Power Generation and District Heating

    International Nuclear Information System (INIS)

    Herzberger, Karlheinz

    1987-01-01

    The multinational BBC Brown Brave Group, which has its head-quarters in Baden/Switzerland, was founded in 1891. Its German company is Brown, Brave and CIEs AGM, Mannheim. The field of operation covers wide areas of electrical engineering: These includes mainly the manufacture of installations and equipment for the generation, conversion, distribution and utilization of electric power, with special emphasis on the capital goods sector. BBC erects turnkey power plants and manufactures electrical equipment for industrial plants and urban transport and main line trains. Also of major importance are standard electrical products such as motors, switches, cables, semiconductor devices as well as measuring and control equipment. In the field of nuclear power BBC is engaged in particular in the development and construction of high-temperature reactors for the generation of electric power and process heat. The following presentation gives a short view on the milestones of the HTR development achieved in 1987

  15. Green power programs in Canada : 2003 : overview of Government green power policies, utility green power implementation initiatives, green power and certificate marketing programs, and their benefits

    International Nuclear Information System (INIS)

    Whitmore, J.; Bramley, M.; Holmes, R.

    2004-09-01

    Green power is defined as electricity produced from renewable sources, and whose production has low adverse impacts on the environment, human health and communities. Green power has near-zero greenhouse gas (GHG) emissions and includes sources such as wind, hydro, and solar power. It offers several environmental benefits, as well as the enhancement of energy security, regional development, economic diversification and the creation of skilled jobs. There are four categories of programs related to green power development in Canada: government green power policies, utility green power development programs, green power marketing initiatives, and green power certificate marketing initiatives. Most of the activities in Canada associated with these four categories in 2003 were discussed in this report. However, difficulties with quantification prevented the inclusion of some green power activities such as (1) the generation of green power not certified or identified by the generator as green power, (2) industry or residential self-generation, (3) net metering, and (4) small government programs. Green power generation facilities in 2003 totaled 775 MW of capacity compared to 539 MW in 2002. Hydro capacity represented 41 per cent, followed by wind capacity at 40 per cent and wood waste at 17 per cent. Most of the green power generation facilities in 2003 were located in Alberta, followed by British Columbia, Ontario and Quebec. 230 refs., 8 tabs., 1 fig

  16. Economic assessment of the engineering basis for wind power: Perspective of a vertically integrated utility

    International Nuclear Information System (INIS)

    Roy, Sanjoy

    2009-01-01

    If wind park configurations are globally coordinated across the service area of a power utility, then electricity can be generated for the grid with substantial cost advantages. Based on this premise, the paper introduces a model by which large scale assessment of grid connected wind based power generation may be undertaken for a utility service area. The model can be useful to the policy maker for decisions regarding suitable wind portfolio standards (WPS) definition. The utility, on the other hand, may use the model to study its service area for prospective wind based generation. Aspects of the problem modelled include cost-of-energy from individual generating units, daily load variations for the utility with emphasis on limited penetration, features of wind at prospective installation sites, makes of wind energy conversion systems (WECS) available, and recovery of expenditure through revenue. Application of the model to an assessment exercise for the state of Andhra Pradesh (India) is presented as an example. (author)

  17. Long-Term Reliability of a Hard-Switched Boost Power Processing Unit Utilizing SiC Power MOSFETs

    Science.gov (United States)

    Ikpe, Stanley A.; Lauenstein, Jean-Marie; Carr, Gregory A.; Hunter, Don; Ludwig, Lawrence L.; Wood, William; Iannello, Christopher J.; Del Castillo, Linda Y.; Fitzpatrick, Fred D.; Mojarradi, Mohammad M.; hide

    2016-01-01

    Silicon carbide (SiC) power devices have demonstrated many performance advantages over their silicon (Si) counterparts. As the inherent material limitations of Si devices are being swiftly realized, wide-band-gap (WBG) materials such as SiC have become increasingly attractive for high power applications. In particular, SiC power metal oxide semiconductor field effect transistors' (MOSFETs) high breakdown field tolerance, superior thermal conductivity and low-resistivity drift regions make these devices an excellent candidate for power dense, low loss, high frequency switching applications in extreme environment conditions. In this paper, a novel power processing unit (PPU) architecture is proposed utilizing commercially available 4H-SiC power MOSFETs from CREE Inc. A multiphase straight boost converter topology is implemented to supply up to 10 kilowatts full-scale. High Temperature Gate Bias (HTGB) and High Temperature Reverse Bias (HTRB) characterization is performed to evaluate the long-term reliability of both the gate oxide and the body diode of the SiC components. Finally, susceptibility of the CREE SiC MOSFETs to damaging effects from heavy-ion radiation representative of the on-orbit galactic cosmic ray environment are explored. The results provide the baseline performance metrics of operation as well as demonstrate the feasibility of a hard-switched PPU in harsh environments.

  18. Economic opportunities resulting from a global deployment of concentrated solar power (CSP) technologies-The example of German technology providers

    International Nuclear Information System (INIS)

    Vallentin, Daniel; Viebahn, Peter

    2010-01-01

    Several energy scenario studies consider concentrated solar power (CSP) plants as an important technology option to reduce the world's CO 2 emissions to a level required for not letting the global average temperature exceed a threshold of 2-2.4 o C. A global ramp up of CSP technologies offers great economic opportunities for technology providers as CSP technologies include highly specialised components. This paper analyses possible value creation effects resulting from a global deployment of CSP until 2050 as projected in scenarios of the International Energy Agency (IEA) and Greenpeace International. The analysis focuses on the economic opportunities of German technology providers since companies such as Schott Solar, Flabeg or Solar Millennium are among the leading suppliers of CSP technologies on the global market.

  19. Demonstration of Active Power Controls by Utility-Scale PV Power Plant in an Island Grid: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Gevorgian, Vahan; O' Neill, Barbara

    2017-02-01

    The National Renewable Energy Laboratory (NREL), AES, and the Puerto Rico Electric Power Authority conducted a demonstration project on a utility-scale photovoltaic (PV) plant to test the viability of providing important ancillary services from this facility. As solar generation increases globally, there is a need for innovation and increased operational flexibility. A typical PV power plant consists of multiple power electronic inverters and can contribute to grid stability and reliability through sophisticated 'grid-friendly' controls. In this way, it may mitigate the impact of its variability on the grid and contribute to important system requirements more like traditional generators. In 2015, testing was completed on a 20-MW AES plant in Puerto Rico, and a large amount of test data was produced and analyzed that demonstrates the ability of PV power plants to provide various types of new grid-friendly controls. This data showed how active power controls can leverage PV's value from being simply an intermittent energy resource to providing additional ancillary services for an isolated island grid. Specifically, the tests conducted included PV plant participation in automatic generation control, provision of droop response, and fast frequency response.

  20. Speech Act Classification of German Advertising Texts

    Directory of Open Access Journals (Sweden)

    Артур Нарманович Мамедов

    2015-12-01

    Full Text Available This paper uses the theory of speech acts and the underlying concept of pragmalinguistics to determine the types of speech acts and their classification in the German advertising printed texts. We ascertain that the advertising of cars and accessories, household appliances and computer equipment, watches, fancy goods, food, pharmaceuticals, and financial, insurance, legal services and also airline advertising is dominated by a pragmatic principle, which is based on demonstrating information about the benefits of a product / service. This influences the frequent usage of certain speech acts. The dominant form of exposure is to inform the recipient-user about the characteristics of the advertised product. This information is fore-grounded by means of stylistic and syntactic constructions specific to the advertisement (participial constructions, appositional constructions which contribute to emphasize certain notional components within the framework of the advertising text. Stylistic and syntactic devices of reduction (parceling constructions convey the author's idea. Other means like repetitions, enumerations etc are used by the advertiser to strengthen his selling power. The advertiser focuses the attention of the consumer on the characteristics of the product seeking to convince him of the utility of the product and to influence his/ her buying behavior.

  1. Childhood cancer in the vicinity of nuclear power plants. Results of a German study in perspective; Kinderkanker in de omgeving van kerncentrales. Resultaten van een Duitse studie in perspectief

    Energy Technology Data Exchange (ETDEWEB)

    Dekkers, S.A.J.; Slaper, H.; Tanzi, C.P.

    2010-09-15

    Whether or not childhood cancer occurs more frequently in the vicinity of nuclear power plants remains uncertain. The results of a German study completed in 2007 that found a significantly increased risk of disease are not confirmed in British and French investigations. This follows from work carried out at RIVM. In the German study, the so-called KiKK-study, the number of cases of childhood cancer in the vicinity of sixteen German nuclear power plants in recent decades was investigated. The study showed that children under the age of five who live within five kilometers of a nuclear power plant are at an increased risk of developing childhood cancer. The authors of the study are unable to explain this risk, which cannot be explained as an effect of the extremely limited extra radiation produced by a nuclear power plant. After publication of the KiKK-study's results questions were asked in Dutch parliament. The minister of VROM (housing, spatial planning and the environment) in response to these questions asked RIVM to compare the results of the German study with those of other studies and to give extra attention to the situation in the vicinity of Borssele, the location of the only Dutch nuclear power plant. In Borssele, circa three hundred children under the age of five live within five kilometers of the nuclear power plant. If the risk observed in Germany is applicable to the nuclear power plant at Borssele, one extra case of childhood cancer could be expected every thirty years. Epidemiological research would not be able to determine a frequency that low. A person living in the vicinity of the nuclear power plant at Borssele incurs less radiation from the power plant during a year, than the average dose a Dutch citizen receives in a single day from natural sources. The extra risk observed in Germany cannot be explained as the effect of such a low dose. [Dutch] Of kinderkanker nabij kerncentrales vaker voorkomt blijft onzeker. Het resultaat van een Duits

  2. Utilization of brown coal in FRG power plants

    Energy Technology Data Exchange (ETDEWEB)

    Kotler, V.R.

    1985-07-01

    FRG methods are studied for utilizing brown coal in view of the development of Kansk-Achinsk brown coal deposits. The use of brown coal in FRG power plants has increased from 15% in 1950- 1960 to 85% (total output) in 1982, providing 79.4 TWh of electrical energy. The remainder was used for briquetting, pulverization and breeze coke. In 1982 nearly 100 million tons of brown coal were burned by six large power stations (rated capacity 11,400 MW) to produce nearly 80 billion kWh of energy. Measures are discussed taken to reduce slagging and to remove excessive moisture content. Problems are analyzed associated with increased contamination of the atmosphere in areas with high population density (412/km/sup 2/) and cost of suppression is reviewed. According to available data, the cost of preventive measures taken by FRG, USA, Japan and the Netherlands is equal to 30% of the total cost of the energy. The most critical problem is suppression of sulfur dioxide, either by dry or wet scrubbers or by the addition of dry dolomite or lime to the furnace (75% of all SO/sub 2/ emissions in FRG comes from power stations). A method is described developed by RWE based on a series of distribution headers in the upper part of combustion chambers. At best, 70-80% reduction can be achieved. 14 references.

  3. Plant life extensions for German nuclear power plants? Controversial discussion profit taking of nuclear power plant operators; Laufzeitverlaengerungen fuer die deutschen Kernkaftwerke? Kurzanalyse zu den Gewinnmitnahmen der KKW-Betreiber

    Energy Technology Data Exchange (ETDEWEB)

    Matthes, Felix C.

    2009-10-15

    The discussion on the plant life extensions for German nuclear power plants beyond the residual quantity of electricity particularly focus on three aspects: Effects for the emission of carbon dioxide as a greenhouse gas; Development of the electricity price for which a reduction or attenuation is postulated due to a plant life extension; Skimming of additional profits at operating companies and their use in the safeguarding of the future (development of renewable energies, support of energy efficiency, promotion of the research, consolidation of the public budget, and so on). Under this aspect, the author of the contribution under consideration reports on the profit taking of nuclear power plant operators. The presented analysis considers three aspects: (a) Specification of the quantity structures for the investigated model of plant life extension; (b) The decisive parameter is the revenue situation and thus the price development for electricity at wholesale markets; (c) Determination and evaluation of the course in time of the profit taking.

  4. LWR safety studies. Analyses and further assessments relating to the German Risk Assessment Study on Nuclear Power Plants. Vol. 3

    International Nuclear Information System (INIS)

    1983-01-01

    Critical review of the analyses of the German Risk Assessment Study on Nuclear Power Plants (DRS) concerning the reliability of the containment under accident conditions and the conditions of fission product release (transport and distribution in the environment). Main point of interest in this context is an explosion in the steam section and its impact on the containment. Critical comments are given on the models used in the DRS for determining the accident consequences. The analyses made deal with the mathematical models and database for propagation calculations, the methods of dose computation and assessment of health hazards, and the modelling of protective and safety measures. Social impacts of reactor accidents are also considered. (RF) [de

  5. Implementation and test of proposals to integrate human factors in reporting and causal analysis in nuclear power plants

    International Nuclear Information System (INIS)

    Wilpert; Maimer, H.; Miller, R.; Fahlbruch, B.; Leiber, I.; Szameitat, S.; Baggen, R.; Gans, A.; Becker, G.

    1998-01-01

    The research project 'Implementation and Test of Proposals to integrate Human Factors in Reporting and Causal Analysis in Nuclear Power Plants' ('Implementation and Test', SR 2039/8) is based on two antecedent projects: 'Reporting System' (SR 2039/1) and 'Causal Analysis' (SR 2039/2). The project 'Implementation and Test' conducted various tests and introductory programs in cooperation with different target groups concerning the event analysis methodology 'SOL - Safety through Organizational Learning': Regulators, consultant organizations, union/works councillors and utilities. Thus, SOL was concurrently optimized and [apted for the practice in the German nuclear power industry. SOL was also validated in a German nuclear power plant using a concrete event. Results of the 'Implementation and Test' project demonstrate that SOL is fit to conduct event analyses practicably and economically with appropriate comprehensiveness and depth. SOL facilitates the identification of relevant contributing factors of events. This report concludes with various concrete proposals for the further development of the Program of the Federal Ministry of Environment, Nature Protection and Reactor Safety (BMU) and the Federal Agency of R[iation Protection (BfS) concerning 'The Contribution of Humans to Safety of Nuclear Power Plants'. (orig.) [de

  6. DEMorphy, German Language Morphological Analyzer

    OpenAIRE

    Altinok, Duygu

    2018-01-01

    DEMorphy is a morphological analyzer for German. It is built onto large, compactified lexicons from German Morphological Dictionary. A guesser based on German declension suffixed is also provided. For German, we provided a state-of-art morphological analyzer. DEMorphy is implemented in Python with ease of usability and accompanying documentation. The package is suitable for both academic and commercial purposes wit a permissive licence.

  7. Impact оf the First World War оn the Transformation of German Army

    Directory of Open Access Journals (Sweden)

    Evdokimova Tatyana

    2014-11-01

    Full Text Available Germany’s defeat in World War I and proclamation of the first German republic significantly influenced the change of the role of the army in the German state. At the stage of reorganization of the Kaiser’s army into the Reichswehr (1918–1921 the main result of this transformation became the creation of a new model of the German Army in which the principle of “distancing” the army from politics was replaced by new legislative and political realities that raised the question of inevitability of relationship between the army and the state. The Versailles Treaty and the Weimar constitution put forward the task of turning the German army into integral part of the state apparatus which led to losing its apoliticality. They also contributed to the emergence of Reich Ministry and the post of Reich Minister combined in one person the representative of the army and the state power. Besides, they helped to form a united German professional army and provided joint search of allies in the field of armaments by politicians and military men. The army tried to defend the old Prussian military traditions in terms of the German State called itself the Reich, and Weimar politicians sought to put the army under a parliamentary-presidential control. At the later stage of the Weimar Republic political generals will appear in the army, and important government positions will be taken by the representatives of the Generalitat. But the outcome of the force balance already at the stage of development of the temporary Reichswehr, when the real power in the army was in hands of the commander of the ground forces, and not of the Reich President and Reich Minister largely predetermined the strength of the conservative military elite in the future.

  8. Health Information in German (Deutsch)

    Science.gov (United States)

    ... Tools You Are Here: Home → Multiple Languages → German (Deutsch) URL of this page: https://medlineplus.gov/languages/german.html Health Information in German (Deutsch) To use the sharing features on this page, ...

  9. How EPRI [Electric Power Research Institute] helps utilities save money

    International Nuclear Information System (INIS)

    Anon.

    1996-01-01

    A number of case studies are presented which illustrate how the work of the Electric Power Research Institute in the USA has enabled nuclear utilities to save money. The areas covered by the examples are: steam generator tube repair; streamlining of reliability centred maintenance; cost effective instrumentation and control maintenance; reducing the frequency of instrument calibration; optimising the engineering change process; detecting and reducing fuel failure; extending the qualified life of equipment. (U.K.)

  10. Bulk power system performance issues affecting utility peaking capacity additions

    Energy Technology Data Exchange (ETDEWEB)

    Garrity, T.F. [GE Power Sytems, Schenectady, NY (United States)

    1994-12-31

    This paper presents a discussion of transmission system constraints and problems that affect the siting and rating of peaking capacity additions. Techniques for addressing and modifying these concerns are presented. Particular attention is paid to techniques that have been successfully used by utilities to improve power transfer and system loadability, while avoiding the construction of additional transmission lines. Proven techniques for dealing with thermal, short-circuit level and stability issues are presented.

  11. 1997: Nuclear power in the German power industry

    International Nuclear Information System (INIS)

    Wnuk, A.

    1998-01-01

    Also in 1997, nuclear power contributed the largest share among all sources of energy to the supply of electricity in Germany, generating 170,3 TWh. This marks a considerable increase by almost 5% over the previous year's level. Nuclear power held a 31.0% share in the supply of electricity in Germany, and a 34.7% share in public supply. Hard coal, producing 143.1 TWh, contributed a share of 26.0%. Electricity generation from lignite decreased by 1.8%, reaching 141.7 TWh; its share is now 25.8%. Hydrocarbons hold a share in gross electricity generation of nearly 12% (to which oil merely contributes 1%), which is a low level by international standards. Hydroelectricity generation decreased by 3.6% down to 3.8%. The upward trend of the economy raised the electricity requirement in industry by 2.2%. Net consumption by private households decreased by 2.5%. For the year under review, the foreign trade balance in electricity showed an excess of exports over imports of 2.4 TWh. (orig.) [de

  12. Contracts on electric power supply set up between communities (communal associations, countries) and public electricity utilities

    Energy Technology Data Exchange (ETDEWEB)

    Hedrich, B

    1976-01-01

    There is not any original communal right to energy supply for the population. The affiliation of local power supply to the local administration cannot be justified either by the public purpose of service or by the term provision of existence. The utilities do not get a communal license when getting the so-called licensing contract. According to its legal nature, the licensing contract is a mixture of legal positions composed of elements of the civil law and the public law. (Administrative lawsuit). The so-called power supply contract is a mutual legal relationship under civil law on the utilization of electric power, made to last. (Permanent obligation for utilization). When concluding both contracts, it is a matter of economic activities undertaken by the communities. Fiscal considerations are in the foreground. Legal regulations concerning roads and distances and serving as starting points for concluding a licensing contract are alien to the system and are to be abolished. Communities should only be responsible for local energy supply on a basis under public law. In lieu of it a stronger obligation to be met by large utilities ought to be ensured by ties under public law.

  13. dena grid study II. Integration of renewable energy sources into the German power supply system until 2020; dena - Netzstudie II. Integration erneuerbarer Energien in die deutsche Stromversorgung bis 2020

    Energy Technology Data Exchange (ETDEWEB)

    Agricola, Annegret C.; Seidl, Hannes; Zoch, Immo (comps.)

    2010-12-15

    With its broad system approach, dena Grid Study II describes new ways of developing Germany's integrated grid with regard to the expansion of renewable energy sources and taking not only an economically optimised conventional power generation system but also European power trading into account. Basis for detailed grid planning. Having investigated many different transmission technologies, grid management measures and options for increasing flexibility on both the supply and demand side, the study does much more than simply identify grid expansion requirements, it shows the path towards overall optimisation of the energy supply system. In addition to robustly identifying grid expansion requirements, dena Grid Study II provides a very sound basis for further detailed grid planning and the identification of specific power routes in the German power transmission grid. Increasing grid expansion requirements. dena Grid Study II investigates the expansion of electricity generation from renewable energy sources to 39 percent by 2020. However, this is just an interim goal. By as soon as 2030, the German Federal Government is planning to raise the proportion of renewable electricity generation to 50 percent. This shows that even after 2020, further adaptation of grid infrastructure will still be necessary. Practical action required. If the grid expansion required to integrate renewable energy sources is to be achieved rapidly, there is an urgent need to back up the grid expansion scenarios presented in dena Grid Study II with practical action. (orig.)

  14. Lawsuits concerning nuclear power generation in FRG

    International Nuclear Information System (INIS)

    Saito, Osamu

    1980-01-01

    The confirmation of the courts of justice is required for the permission of power stations. This proposition is not in the laws in FRG, but in view of the recent judicatory regulation, it seems to be the norm established experimentally. From the character of German nation, more than 40 specialists and the committees independent of administration take part in the procedure of administrative permission, but considering the temporary procedure, the processes of five classes of courts join in these. Based on the background of such situation, the author outlined the traditional practice in the legislation and administration in the field of nuclear power generation, then investigated into the decisions of Freiburg and Wuerzburg courts of administrative litigation in 1977 and the decision of the federal constitutional court in 1978. Confronting the same technology of light water reactors, the Freiburg court said that the device protecting from the burst of a pressure vessel is necessary, but the Wuerzburg court did not demand it. The confrontations similar to it were seen in the requirements for the utilization of radioactive substances and the final storage of them. The recent decision of the federal constitutional court is concerned with FBRs, and the court discussed the problem of ''residual risks''. The studies on the German decisions are useful for Japan. (Kako, I.)

  15. DDR-Landeskundliches im Deutschunterricht (East German Culture in the German Lesson).

    Science.gov (United States)

    Wazel, Gerhard

    1988-01-01

    Demonstrates with concrete examples from the texts of a German class for advanced learners how aspects of East German culture can be realized in vocabulary, in lectures, and in the development of listening comprehension and speaking skills. Texts are appended. (DJD)

  16. A performance comparison of urban utility vehicles powered with IC engine and solid polymer fuel cell technologies

    International Nuclear Information System (INIS)

    Teachman, M.E.; Scott, D.S.

    1993-01-01

    Utility vehicles provide ground transportation for crew and electric power at work sites that lack grid supply. The performances of utility vehicles designed with conventional architectures (spark ignition engine for propulsion and a motor generator for electric power) and with a fuel cell/battery architectures, are compared over a range of vehicle missions. Results indicate that fuel cell/battery hybrid systems are lighter than conventional systems for missions requiring short driving distances and work site power levels exceeding 10 kW. Conventional spark ignition engine/gen-set power systems are lighter for missions requiring more than 1 hour of driving and less than 10 kW of work site power. Fuel cell/battery systems are more efficient than spark ignition engine/gen-set systems for all missions. 7 figs., 3 tabs., 20 refs

  17. The German energy transition in 5 popular beliefs - Alternatives Economiques, January 2017, Nr 364 bis

    International Nuclear Information System (INIS)

    Althoff, Jens; Hutinet, Laurent; Belliard, David; Boulanger, Vincent; Ruedinger, Andreas

    2017-01-01

    This publication first discusses and denies five popular beliefs often heard or read in France about the German energy transition: Germany pollutes us with its coal-fired plants, phasing out nuclear is impossible, 100 per cent of renewable energies is an utopia, energy transition slows down the economy, we will never be able to move without oil. The other articles present the example of a German small town where inhabitants took charge of electric power production, outline that the German energy transition comes along an actual democratic revolution through the appropriation of renewable energy production tools, and discuss the difficult issue of phasing out carbon

  18. Energy efficiency. Lever for the German energy transition

    International Nuclear Information System (INIS)

    Persem, Melanie; Roesner, Sven

    2014-05-01

    This document provides some key data on energy consumption in housing and public buildings, indicates the national German objectives in terms of reduction of energy consumption, of reduction of electricity consumption, of energy efficiency, and of evolution of energy consumption in housing and public buildings and in the transport sector. It gives some data related to energy saving and achievements: energy efficiency of the German economy, improvements in housing energy efficiency and insulation, financial support for low income households, reduction of energy consumption within small-medium enterprises, the public sector, the data processing sector and public lighting, and energy saving potential by renewal of public buildings. It indicates the main measures and arrangements: information, support programs for enterprises, local communities and individuals. A graph illustrates a comparison of shares of household power consumption in France and in Germany

  19. Utilization of Model Predictive Control to Balance Power Absorption Against Load Accumulation: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Abbas, Nikhar; Tom, Nathan

    2017-09-01

    Wave energy converter (WEC) control strategies have been primarily focused on maximizing power absorption. The use of model predictive control strategies allows for a finite-horizon, multiterm objective function to be solved. This work utilizes a multiterm objective function to maximize power absorption while minimizing the structural loads on the WEC system. Furthermore, a Kalman filter and autoregressive model were used to estimate and forecast the wave exciting force and predict the future dynamics of the WEC. The WEC's power-take-off time-averaged power and structural loads under a perfect forecast assumption in irregular waves were compared against results obtained from the Kalman filter and autoregressive model to evaluate model predictive control performance.

  20. The Municipal Electrical Utilities' role in buying and selling power

    International Nuclear Information System (INIS)

    Crocker, D.I.

    1999-01-01

    Ontario's Municipal Electrical Utilities (MEUs) are the front-line providers of electricity services for most of the consumers in Ontario. MEUs serve 2.8 million customers (about 70 per cent of all power sold in Ontario). The new regulatory regime resulting from Ontario's Energy Competition Act (1998) will significantly impact MEUs. The changes aim to consolidate and rationalize the point of sale provision of power to Ontario customers and increase the efficiency of the sector. The Energy Competition Act (1998) creates a competitive electricity marketplace and provides mechanisms for its operation, but it is the MEUs which will bear the risk of market failures. Some of the changes which will be most important to MEUs are: (1) incorporation, (2) default supplier, and (3) oversight by the OEB. It is the author's view that the move towards open markets in electricity is unlikely to enlarge the decision making power of MEUs. On the contrary, the legislative scheme creates a complex regulatory environment wherein the distribution corporation must strictly comply with the OEB's requirements and public policy concerns in exercising its functions. As the MEUs essentially serve as a buffer in the newly opened retail markets, they must find ways to minimize their risk of market failures or spread the cost so as to remain viable commercial entities. They must also devise new information systems prior to the opening of the new market to deal with customer and default consumer pricing, billing and transfer of customers to and from retailers. Municipal utilities will also have to consider restructuring of their own operations, including determining which businesses should be pursued through competitive affiliates

  1. Losses in German nuclear power plants

    International Nuclear Information System (INIS)

    Abinger, R.

    1982-01-01

    The author illustrates the special features of engineering insurance for nuclear power plants. The shares of the Allianz Versicherungs-AG in the insurance of construction and erection work and in machinery insurance are dealt with. Risk estimation is usually based on statistical analysis of losses. Loss analysis in the conventional sector of nuclear power plants shows typical characteristics of traditional erection and machinery losses. In the nuclear field, however, costs are greatly increased by added safety measures. For this reason, additional cover is allocated and incorporated in premium assessment. Examples from erection and machinery reveal the greater costs involved in handling losses. (orig.) [de

  2. Planning your first wind power project. A primer for utilities: Everything you need to know to bring your first wind power plant on-line

    International Nuclear Information System (INIS)

    Conover, K.; Davis, E.

    1994-12-01

    This primer has been prepared to help utility personnel become familiar with some or the details relative to wind power technology and project development. It is written as a series of relatively independent chapters to address specific topics or phases of wind power evaluation and development as they might occur within a utility. The topics include: wind prospecting and the first pass analysis, resource validation, project feasibility, resource planning and evaluation, resource acquisition, project development, equipment selection, project design and construction, and plant operation and maintenance

  3. [German influences on Romanian medical terminology].

    Science.gov (United States)

    Răcilă, R G; Răileanu, Irena; Rusu, V

    2008-01-01

    The medical terminology plays a key part both in the study of medicine as well as in its practice. Moreover, understanding the medical terms is important not only for the doctor but also for the patients who want to learn more about their condition. For these reasons we believe that the study of medical terminology is one of great interest. The aim of our paper was to evaluate the German linguistic and medical influences on the evolution of the Romanian medical terminology. Since the Romanian-German cultural contacts date back to the 12th century we had reasons to believe that the number of German medical words in Romanian would be significant. To our surprise, the Romanian language has very few German words and even less medical terms of German origin. However, when we searched the list of diseases coined after famous medical personalities, we found out that 26 % of them bore the names of German doctors and scientists. Taken together this proves that the German medical school played an important role on the evolution of Romanian medicine despite the fact that the Romanian vocabulary was slightly influenced by the German language. We explain this fact on the structural differences between the Romanian and German languages, which make it hard for German loans to be integrated in the Romanian lexis. In conclusion we state that the German influence on the Romanian medical terminology is weak despite the important contribution of the German medical school to the development of medical education and healthcare in Romania. Key

  4. Comparison of candidate solar array maximum power utilization approaches. [for spacecraft propulsion

    Science.gov (United States)

    Costogue, E. N.; Lindena, S.

    1976-01-01

    A study was made of five potential approaches that can be utilized to detect the maximum power point of a solar array while sustaining operations at or near maximum power and without endangering stability or causing array voltage collapse. The approaches studied included: (1) dynamic impedance comparator, (2) reference array measurement, (3) onset of solar array voltage collapse detection, (4) parallel tracker, and (5) direct measurement. The study analyzed the feasibility and adaptability of these approaches to a future solar electric propulsion (SEP) mission, and, specifically, to a comet rendezvous mission. Such missions presented the most challenging requirements to a spacecraft power subsystem in terms of power management over large solar intensity ranges of 1.0 to 3.5 AU. The dynamic impedance approach was found to have the highest figure of merit, and the reference array approach followed closely behind. The results are applicable to terrestrial solar power systems as well as to other than SEP space missions.

  5. Research on technology utilizing data freeway for base nuclear power materials

    International Nuclear Information System (INIS)

    Fujita, Mitsutane; Kurihara, Yutaka; Noda, Tetsuji; Shiraishi, Haruki; Kitajima, Masahiro; Nagakawa, Josei; Yamamoto, Norikazu

    1997-01-01

    In order to carry out the selection of the nuclear power materials which are used in radiation, from high temperature to very low temperature, and in corrosive environment, and the development of the materials effectively, the construction of huge material data base is indispensable. The development of the distributed type material data base called 'freeway' is advanced jointly by National Research Institute for Metals, Japan Atomic Energy Research Institute, Power Reactor and Nuclear Fuel Development Corporation and Japan Science and Technology Corporation. It has been aimed at that the results obtained in each research institute are made into a data base by that institute, and those data bases can be utilized mutually through network. In fiscal year 1996, the transfer to the system, by which the function showing the contents of system data and the function of data retrieval can be utilized from internet, was begun jointly. The present state of the data freeway, the operation environment of World Wide Web, and the trial making of the computation program for forecasting the change of the chemical composition of materials by neutron irradiation are reported. (K.I.)

  6. Enhancing power generation of floating wave power generators by utilization of nonlinear roll-pitch coupling

    Science.gov (United States)

    Yerrapragada, Karthik; Ansari, M. H.; Karami, M. Amin

    2017-09-01

    We propose utilization of the nonlinear coupling between the roll and pitch motions of wave energy harvesting vessels to increase their power generation by orders of magnitude. Unlike linear vessels that exhibit unidirectional motion, our vessel undergoes both pitch and roll motions in response to frontal waves. This significantly magnifies the motion of the vessel and thus improves the power production by several orders of magnitude. The ocean waves result in roll and pitch motions of the vessel, which in turn causes rotation of an onboard pendulum. The pendulum is connected to an electric generator to produce power. The coupled electro-mechanical system is modeled using energy methods. This paper investigates the power generation of the vessel when the ratio between pitch and roll natural frequencies is about 2 to 1. In that case, a nonlinear energy transfer occurs between the roll and pitch motions, causing the vessel to perform coupled pitch and roll motion even though it is only excited in the pitch direction. It is shown that co-existence of pitch and roll motions significantly enhances the pendulum rotation and power generation. A method for tuning the natural frequencies of the vessel is proposed to make the energy generator robust to variations of the frequency of the incident waves. It is shown that the proposed method enhances the power output of the floating wave power generators by multiple orders of magnitude. A small-scale prototype is developed for the proof of concept. The nonlinear energy transfer and the full rotation of the pendulum in the prototype are observed in the experimental tests.

  7. Plant life management optimized utilization of existing nuclear power plants

    International Nuclear Information System (INIS)

    Watzinger, H.; Erve, M.

    1999-01-01

    For safe, reliable and economical nuclear power generation it is of central importance to understand, analyze and manage aging-related phenomena and to apply this information in the systematic utilization and as-necessary extension of the service life of components and systems. An operator's overall approach to aging and plant life management which also improves performance characteristics can help to optimize plant operating economy. In view of the deregulation of the power generation industry with its increased competition, nuclear power plants must today also increasingly provide for or maintain a high level of plant availability and low power generating costs. This is a difficult challenge even for the newest, most modern plants, and as plants age they can only remain competitive if a plant operator adopts a strategic approach which takes into account the various aging-related effects on a plant-wide basis. The significance of aging and plant life management for nuclear power plants becomes apparent when looking at their age: By the year 2000 roughly fifty of the world's 434 commercial nuclear power plants will have been in operation for thirty years or more. According to the International Atomic Energy Agency, as many as 110 plants will have reached the thirty-year service mark by the year 2005. In many countries human society does not push the construction of new nuclear power plants and presumably will not change mind within the next ten years. New construction licenses cannot be expected so that for economical and ecological reasons existing plants have to be operated unchallengeably. On the other hand the deregulation of the power production market is asking just now for analysis of plant life time to operate the plants at a high technical and economical level until new nuclear power plants can be licensed and constructed. (author)

  8. [Sample German LAPS.

    Science.gov (United States)

    Rosenthal, Bianca

    Four learning activity packages (LAPS) for use in secondary school German programs contain instructional materials which enable students to improve their basic linguistic skills. The units include: (1) "Grusse," (2) "Ich Heisse...Namen," (3) "Tune into Your Career: Business Correspondence 'Auf Deutch'," and (4) "Understanding German Culture."…

  9. The development of the breeder reactor program of the German Federal Republic

    International Nuclear Information System (INIS)

    Haunschild, H.H.

    1984-01-01

    This article recapitulates the stages of the program which is in hand in the German Federal Republic concerning breeder reactors with fast neutrons. In particular, it describes in detail the causes for the delays in the construction of the demonstration reactor SRN 300 (Kalkar) for which the commissioning has now been fixed for 1987. It emphasizes the importance of the collaboration which exists in Europe for the establishment of the projects and the construction of fast neutron power stations, including the SNR 2 reactor; the construction of the latter could begin in the German Federal Republic at the end of the Eighties [fr

  10. Utilization of tidal power in Russia in overcoming the global energy and ecological crisis

    International Nuclear Information System (INIS)

    Bernshtein, L.B.; Usachev, I.N.

    1997-01-01

    The 30 years of the exploitation of the TPP Rance in France and Kyslogubskaya TPP in Russia had proved the energy expedience economical and ecological effectiveness and a high performance of the tidal energy. The possibility of such utilizing could be proved thanks to the application of the theoretical cycles of Gibrat, of the bulb units and the russian model of the tidal utilizing and application of the floating methods of creating the TPP. The investigations at TPP Kislaya Guba helped to solve the row of problems of marine power building with the high exploitation performance and ecological safety. Thus the TPP of Mezen with a capacity of 17 million kW can transfer to the united power system of Europe 50 TWh/year and the Tugur TPP with a capacity 8 million kW can produce 20 TWh/year of energy for the power system of seaside of Russian and Japan. Penzinskaya TPP with the capacity of 87 million kW can be promoted in 21. century in connection to the advanced in USA proposition of construction of the combining transport-power tunnel across the Bering Strait. (authors)

  11. Delays help German utilities maintain self-financing ratios

    International Nuclear Information System (INIS)

    Radtke, G.

    1979-01-01

    Estimates of electricity consumption have been substantially reduced and nuclear plant is now expected to be 22% of total generating capacity in 1985 instead of the earlier forecast of 36%. The decline in the ordering of new plant has benefited the financial position of the electricity utilities and the expected fall in self-financing ratios has not occurred. (U.K.)

  12. Electric utility companies and geothermal power

    Science.gov (United States)

    Pivirotto, D. S.

    1976-01-01

    The requirements of the electric utility industry as the primary potential market for geothermal energy are analyzed, based on a series of structured interviews with utility companies and financial institution executives. The interviews were designed to determine what information and technologies would be required before utilities would make investment decisions in favor of geothermal energy, the time frame in which the information and technologies would have to be available, and the influence of the governmental politics. The paper describes the geothermal resources, electric utility industry, its structure, the forces influencing utility companies, and their relationship to geothermal energy. A strategy for federal stimulation of utility investment in geothermal energy is suggested. Possibilities are discussed for stimulating utility investment through financial incentives, amelioration of institutional barriers, and technological improvements.

  13. Accent, Intelligibility, and the Role of the Listener: Perceptions of English-Accented German by Native German Speakers

    Science.gov (United States)

    Hayes-Harb, Rachel; Watzinger-Tharp, Johanna

    2012-01-01

    We explore the relationship between accentedness and intelligibility, and investigate how listeners' beliefs about nonnative speech interact with their accentedness and intelligibility judgments. Native German speakers and native English learners of German produced German sentences, which were presented to 12 native German speakers in accentedness…

  14. Key Issues for the control of refueling outage duration and costs in PWR Nuclear Power Plants

    International Nuclear Information System (INIS)

    Degrave, Claude

    2002-01-01

    For several years, EDF, within the framework of the CIDEM1 project and in collaboration with some German Utilities, has undertaken a detailed review of the operating experience both of its own NPP and of foreign units, in order to improve the performances of future units under design, particularly the French-German European Pressurized Reactor (EPR) project. This review made it possible to identify the key issues allowing to decrease the duration of refueling and maintenance outages. These key issues can be classified in 3 categories Design, Maintenance and Logistic Support, Outage Management. Most of the key issues in the design field and some in the logistic support field have been studied and could be integrated into the design of any future PWR unit, as for the EPR project. Some of them could also be adapted to current plants, provided they are feasible and profitable. The organization must be tailored to each country, utility or period: it widely depends on the power production environment, particularly in a deregulation context. (author)

  15. Power to gas. The final breakthrough for the hydrogen economy?

    Energy Technology Data Exchange (ETDEWEB)

    Winkler-Goldstein, Raphael [Germany Trade and Invest (GTAI), Paris (France); Rastetter, Aline [Alphea Hydrogene, Forbach (France)

    2013-04-01

    In Germany more than 20% of the energy mix is made up of renewable energy and its share is rapidly increasing. The federal government expects renewables to account for 35% of Germany's electricity consumption by 2020, 50% by 2030 and 80% by 2050. According to the German Energy Agency, multi-billion euro investments in energy storage are expected by 2020 in order to reach these goals. The growth of this fluctuating energy supply has created demand for innovative storage options in Germany and it is accelerating the development of technologies in this field. Along with batteries and smart grids, hydrogen is expected to be one of the lead technologies. 2010 a commercialization roadmap for wind hydrogen was set up by the two northern federal states of Hamburg and Schleswig-Holstein with the goal of utilizing surplus wind power for the electrolytic production of hydrogen. With the creation of the 'performing energy initiative', 2011, Brandenburg and Lower Saxony joined this undertaking. The aim of this initiative is to set up demonstration projects in order to develop and optimize wind-hydrogen hybrid systems and prepare their commercialization for the time after 2020. Beside the conversion of hydrogen into electricity and fuel for cars, further markets like raw material for the chemical, petrochemical, metallurgy and food industry are going to be addressed. Considering the fact there are over 40 caves currently used for natural gas storage with a total volume of 23.5 billion cubic meters and 400 000 km gas grid available in Germany, the German Technical and Scientific Association for Gas and Water sees opportunities for hydrogen to be fed into the existing natural gas grid network. The name of this concept is power-to-gas. According to the current DVGW-Standards natural gas in Germany can contain up to 5% hydrogen. The GERG, European Group on the Gas Research sees potential to increase this amount up to 6% to 20%. Power-to-gas could serve both for fuel and for the

  16. Environmental impact of fossil fuel utilization in the thermal power plant

    International Nuclear Information System (INIS)

    Ghasem D Najafpour; Seyed Jafar Mehdizadeh; Abdul Rahman Mohamed

    2000-01-01

    Carbon dioxide causes green house effect, has been considered as a pollutant source of our safe environment. Since combustion of fossil fuel may create tremendous amount of carbon dioxide, detecting any pollutant sources would be important to eliminate the pollution sources. Evaluation of smoke dispersion that has been generated by a power plant utilizing fossil fuel is the objective of this paper. The concentration of NO, and SO, in the soil, have been analyzed from a distance of 3 to 4 km far from power plant. The experimental results shown. that the concentration of toxic gases was a little above the international standards. Replacement of fossil fuel by natural gas caused NO, concentration to be developed in the atmosphere, therefore usage of natural gas is limited by environmental protection agencies. Beside the nuclear power plant, the power generated by other sources. are limited. Electric power generated by water dam is not a major contribution of electric power demand. Therefore generation of electricity by any other energy sources, which are friendly to the environment, is recommended. Other sources of energy, such as wind power, solar energy, geothermal, ocean thennal and renewable source of energy can be considered safe for the environment. The goal of environmental management system would be to meet the minimum requirements were established and demanded by the local environmental protection agency or international standard organization (ISO-14000). (Author)

  17. Acceptance of nuclear power: The Fukushima effect

    International Nuclear Information System (INIS)

    Siegrist, Michael; Visschers, Vivianne H.M.

    2013-01-01

    Utilizing a longitudinal study design, the impact of the 2011 accident in Fukushima on acceptance of nuclear power and the evaluation of several scenarios with different percentages of nuclear power were examined. Mail surveys were conducted in the German-speaking part of Switzerland. The first survey took place before the accident in Fukushima (Autumn 2010), the second survey immediately after the accident (March 2011), and the third survey half a year after the accident (October 2011). A sample of 463 persons participated in all three surveys. The accident had a negative impact on the acceptance of nuclear power. The mean change was moderate, and high correlations between the measurement points were observed. Overall, participants thus showed rather stable attitudes towards nuclear power across the three measurement waves. Results of the present study demonstrate the importance of prior beliefs and attitudes for the interpretation of an accident. The evaluation of the various scenarios was strongly influenced by participants’ pre-Fukushima attitudes towards nuclear power. - Highlights: ► Longitudinal studies are important for risk perception research. ► The accident in Fukushima had only a moderate impact on acceptance. ► Acceptance of nuclear power before and after Fukushima was highly correlated. ► People have stable attitudes towards nuclear power

  18. German Orientalism

    OpenAIRE

    Margaret Olin

    2011-01-01

    Review of: Suzanne L. Marchand, German Orientalism in the Age of Empire: Religion, Race and Scholarship, Cambridge and Washington, D.C.: Cambridge University Press, 2009. This analysis of Suzanne L. Marchand’s German Orientalism in the Age of Empire: Religion, Race and Scholarship reads her contribution in part against the background of Edward Said’s path breaking book Orientalism. Differences lie in her more expansive understanding of the term ‘Oriental’ to include the Far East and her conce...

  19. Licensing issues in the context of terrorist attacks on nuclear power plants

    International Nuclear Information System (INIS)

    Danwitz, T. von

    2002-01-01

    The terrorist attack on the World Trade Center in September 2001 has prompted enhanced nuclear risk awareness among the German population. But in the current public debate about the safety of nuclear power plants in Germany in times of new dimensions of danger, aspects such as the role of the constitutional law, the German Atomic Energy Act, and the regulatory system governing nuclear power plant licensing in the context of protection and safety have not been addressed. The author therefore discusses the German nuclear power plant licensing law and administrative regime, elaborating on the significance attributed in those bodies of law to risks like terrorist attacks on nuclear power plants. (orig./CB) [de

  20. Regulating technological change - The strategic reactions of utility companies towards subsidy policies in the German, Spanish and UK electricity markets

    International Nuclear Information System (INIS)

    Stenzel, Till; Frenzel, Alexander

    2008-01-01

    This paper focuses on how incumbent electric utilities strategically react to subsidy schemes supporting renewable energy technologies in the UK, Germany, and Spain. Firms coordinate the development of their technological capabilities and their political activities to shape their regulatory environment. Analysing the diffusion of wind power in these countries, we show that the different ways, in which firms coordinate their technological and political strategies, lead to very different market outcomes, both for the firms' market share and the size of the overall market. Although incumbents are usually seen as being resistant to change in energy systems, we show that Spanish utilities proactively drive the diffusion of wind power. We speculate about the relation between the ownership structure of the energy system and its inertia with respect to the integration of new technologies. We derive novel policy implications that explicitly take into account the strategic actions of incumbent firms shaping the technological and regulatory system

  1. German nuclear policy reconsidered. Implications for the electricity market

    International Nuclear Information System (INIS)

    Fuersch, Michaela; Lindenberger, Dietmar; Malischek, Raimund; Nagl, Stephan; Panke, Timo; Trueby, Johannes

    2011-01-01

    In the aftermath of the nuclear catastrophe in Fukushima, German nuclear policy has been reconsidered. This paper demonstrates the economic effects of an accelerated nuclear phase-out on the German electricity generation sector. A detailed optimization model for European electricity markets is used to analyze two scenarios with different lifetimes for nuclear plants (phase-out vs. prolongation). Based on political targets, both scenarios assume significant electricity demand reductions and a high share of generation from renewable energy sources in Germany. Our principal findings are: First, nuclear capacities are mainly replaced by longer lifetimes of existing coal-fired plants and the construction of new gas-fired plants. Second, fossil fuel-based generation and power imports increase, while power exports are reduced in response to the lower nuclear generation. Third, despite the increased fossil generation, challenging climate protection goals can still be achieved within the framework of the considered scenarios. Finally, system costs and electricity prices are clearly higher. We conclude that the generation sector can generally cope with an accelerated nuclear phase-out under the given assumptions. Yet, we emphasize that such a policy requires a substantial and costly transformation of the supply and the demand side.

  2. 1996: nuclear power in the German power industry

    International Nuclear Information System (INIS)

    Wnuk, A.

    1997-01-01

    Also in 1996, nuclear power contributed the largest share among all sources of energy to the supply of electricity in Germany, generating 161,1 TWh. This marks a considerable increase by almost 5% over the previous year's level. Nuclear power held a 29.4% share in the supply of electricity in Germany, and a 33% share in public supply. Hard coal, producing 152.7 TWh, contributed a share of 27.7%. Electricity generation from lignite rose slightly by 1.2%, reaching 144.3 TWh; its share is now 26.2%. Hydrocarbons hold an 11.5% share in gross electricity generation (to which oil merely contributes 1.3%), which is a low level by international standards. After a continuous rise over the past few years, hydroelectricity generation for the first time showed a decrease by 10.5% because of adverse water conditions. The upward trend of the economy raised the electricity requirement in industry by 1.5%. As a consequence of the long spell of cold weather, net consumption by private households rose by 5.5%. For the year under review, the foreign trade balance in electricity for the first time after 1992 again showed an excess of exports over imports of 5.3 TWh. (orig.) [de

  3. A relative rate utility based distributed power allocation algorithm for Cognitive Radio Networks

    DEFF Research Database (Denmark)

    Mahmood, Nurul Huda; Øien, G.E.; Lundheim, L.

    2012-01-01

    In an underlay Cognitive Radio Network, multiple secondary users coexist geographically and spectrally with multiple primary users under a constraint on the maximum received interference power at the primary receivers. Given such a setting, one may ask "how to achieve maximum utility benefit...

  4. Photovoltaic rural electrification and the electric power utility. Workshop. [Selected Papers

    Energy Technology Data Exchange (ETDEWEB)

    Huacuz, J. M.; Villasenor, F.; Urrutia, M. [eds.] [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1995-12-31

    This document contains the national and international programs about photovoltaic systems for rural electrification and the electric power utility experiences about PV programs. The IERE Workshop was hold from May 8 to 12, 1995 in Cocoyoc, Mexico. It was organized by the Electrical Research Institute of Mexico (Instituto de Investigaciones Electricas (IIE)) and the U.S. Electric Power Research Institute (EPRI). The Workshop was attended by 38 delegates from 13 countries [Espanol] Este documento contiene los programas nacionales e internacionales sobre electrificacion fotovoltaica rural y las experiencias en programas fotovoltaicos de empresas electricas. El taller de trabajo IERE fue realizado los dias del 8 al 12 de mayo de 1995 en Cocoyoc, Mexico. Fue organizado por el Instituto de Investigaciones Electricas (IIE) y el U.S. Electric Power Research Institute (EPRI) (Instituto de Investigaciones de Energia Electrica de Estados Unidos). A este taller de trabajo asistieron 38 delegados de 13 paises

  5. Photovoltaic rural electrification and the electric power utility. Workshop. [Selected Papers

    Energy Technology Data Exchange (ETDEWEB)

    Huacuz, J M; Villasenor, F; Urrutia, M [eds.; Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1996-12-31

    This document contains the national and international programs about photovoltaic systems for rural electrification and the electric power utility experiences about PV programs. The IERE Workshop was hold from May 8 to 12, 1995 in Cocoyoc, Mexico. It was organized by the Electrical Research Institute of Mexico (Instituto de Investigaciones Electricas (IIE)) and the U.S. Electric Power Research Institute (EPRI). The Workshop was attended by 38 delegates from 13 countries [Espanol] Este documento contiene los programas nacionales e internacionales sobre electrificacion fotovoltaica rural y las experiencias en programas fotovoltaicos de empresas electricas. El taller de trabajo IERE fue realizado los dias del 8 al 12 de mayo de 1995 en Cocoyoc, Mexico. Fue organizado por el Instituto de Investigaciones Electricas (IIE) y el U.S. Electric Power Research Institute (EPRI) (Instituto de Investigaciones de Energia Electrica de Estados Unidos). A este taller de trabajo asistieron 38 delegados de 13 paises

  6. Intersolar 2012 - side event: photovoltaic energy at the origin of a transformation of our energy system, French-German crossed-views

    International Nuclear Information System (INIS)

    Spitzley, Jan-Benjamin; Jirous, Filip; Daval, Xavier; Chrometzka, Thomas; Pages, Nicolas; Muders, Herbert

    2012-01-01

    In the framework of the Intersolar Europe 2012 exhibition, the French-German office for Renewable energies (OFAEnR) organised a conference on photovoltaic energy and the transformation of the French-German energy systems. During this French-German exchange of experience, participants exchanged views on the increasing integration of renewable energies to power grids, and on the necessity to develop new energy management and business models for projects financing. This document brings together the available presentations (slides) made during this event: 1 - System integration of PV in Germany and France: Comparing results of the ReS Integration Study (Jan-Benjamin Spitzley, Filip Jirous); 2 - The role of solar PV in France: current status and development opportunities (Xavier Daval); 3 - The European project PV GRID and the relevance of PV in the European power system (Thomas Chrometzka); 4 - Business Models beyond the EEG Act. When feed-in tariffs are no longer sufficient: what project financing models for solar power plants in France and Germany? (Herbert Muders)

  7. Crystal chemistry of germanates: Characteristic structural features of Li,Ge-germanates

    International Nuclear Information System (INIS)

    Ilyushin, G.D.; Dem'yanets, L.N.

    2000-01-01

    Crystallochemical classification of eleven compounds from the Li-germanate family is suggested. Depending on the set of the primary building units (PBU) (M-octahedra of the composition [GeO 6 ] and T-tetrahedra of the composition [GeO 4 ]) and the type of their 'condensation', these germanates are divided into three crystallochemical groups: framework MT-structures (four phases), condensed MT-structures (two phases), and tetrahedral T-condensed structures (five phases). The structural characteristics of the framework Li,Ge-germanates are considered, i.e., their symmetry, crystallographically independent sets of the primary building units, framework architecture, and the types of chains and layers of the (Ge,O)-radicals

  8. Effects of European energy policy on German nuclear phase-out policy

    International Nuclear Information System (INIS)

    Buedenbender, Martin

    2009-01-01

    After the election of the new German government on September 27th, 2009, the nuclear power phase-out decision appears back on top of the political agenda. Hence, an up to date survey of all relevant arguments seems absolutely necessary. In that matter, the scope should not remain national but should also take the European dimension into account. On the European level, a position in favour of nuclear power becomes apparent. Recent political decisions among the 27 member states show a renaissance of atomic energy. EU-Parliament, EU-Commission and EU-Council have all voted for the extensive, long term use of nuclear power in Europe. With its phase-out decision still valid, Germany is part of a minority in Europe. Germany is part of a European market for electricity whose national barriers will blur more and more in the future to form a fully integrated pan-European market in the end. Since nuclear power will provide a major share of the European electricity generation mix, Germany will always be supplied with atomic energy in the long term. This is imperative, regardless of nuclear power plants operating within the borders of Germany or not. Shutting down these facilities in Germany will hence not make the risks associated with atomic energy disappear. It will only add energy-technical challenges to assure long-term supply security. Thus, the new German government should withdraw the phase-out decision. (orig.)

  9. Nuclear power 1984: Progressive normalisation

    International Nuclear Information System (INIS)

    Popp, M.

    1984-01-01

    The peaceful use of nuclear power is being integrated into the overall concept of a safe long-term power supply in West Germany. The progress of normalisation is shown particularly in the takeover of all stations of the nuclear fuel circuit by the economy, with the exception of the final storage of radioactive waste, which is the responsibility of the West German Government. Normalisation also means the withdrawal of the state from financing projects after completion of the two prototypes SNR-300 and THTR-300 and the German uranium enrichment plant. The state will, however, support future research and development projects in the nuclear field. The expansion of nuclear power capacity is at present being slowed down by the state of the economy, i.e. only nuclear power projects being built are proceeding. (orig./HP) [de

  10. Anti-trust control of power prices; Kartellrechtliche Kontrolle von Strompreisen

    Energy Technology Data Exchange (ETDEWEB)

    Becker, Peter [Becker Buettner Held, Marburg (Germany)

    2009-01-15

    The European Commission (Bruessel, Belgium) intensively examined the question, whether electricity tariffs in Germany are formed abusively formed. For this, the centres of the four German energy utilities were examined in the year 2006. A billions-worth penalty against E.ON AG (Duesseldorf, Federal Republic of Germany) could be avoided, because E.ON AG committed itself to the sale of the high-voltage power supply grid and to the sale of power plant capacities. In the Federal Republic of Germany, only few things are done according to the control of electricity tariffs, although the legislator has given an incentive with paragraph 29 of the Law against Restraints of Competition. The author of the contribution under consideration examines the cartel law situation regarding to the price formation at the stock exchange and discusses an increased transparency.

  11. The innovation impact of EU emission trading. Findings of company case studies in the German power sector

    Energy Technology Data Exchange (ETDEWEB)

    Rogge, Karoline S. [Fraunhofer-Institut fuer Systemtechnik und Innovationsforschung (ISI), Karlsruhe (Germany); Swiss Federal Inst. of Technology Zurich (ETH Zurich) (Switzerland). Dept. of Management, Technology, and Economics; Schneider, Malte; Hoffmann, Volker H. [Swiss Federal Inst. of Technology Zurich (ETH Zurich) (Switzerland). Dept. of Management, Technology, and Economics

    2010-05-01

    This paper provides a comprehensive analysis of how the European Emission Trading System (EU ETS) as the core climate policy instrument of the European Union has impacted innovation. Towards this end, we investigate the impact of the EU ETS on research, development, and demonstration (RD and D), adoption, and organizational change. In doing so, we pay particular attention to the rela-tive influences of context factors (policy mix, market factors, public acceptance) as well as firm characteristics (value chain position, technology portfolio, size, vision). Empirically, our analysis is based on multiple case studies with 19 power generators, technology providers, and project developers in the German power sector which we conducted from June 2008 until June 2009. We find that the innovation impact of the EU ETS has remained limited so far because of the scheme's initial lack in stringency and predictability and the relatively greater importance of context factors. Additionally, the impact varies tremendously across technologies, firms, and innovation dimensions, and is most pronounced for RD and D on carbon capture technologies and corporate procedural change. Our analysis suggests that the EU ETS by itself may not provide sufficient incentives for fundamental changes in corporate climate innovation activities at a level adequate for reaching political long-term targets. Based on the study's findings, we derive a set of policy and research recommendations. (orig.)

  12. Occupational radiation exposure of personnel in German light-water type nuclear power plant in the year 1985

    International Nuclear Information System (INIS)

    Urbahn, H.; Mueller, W.; Marx, H.

    1988-01-01

    1985 was a good year with regard to radiation protection for the German nuclear power stations with BWR and PWR. There were favourable values for the collective dose. There was an increase in the collective dose only in some power plants because of dose-intensive repair, replacement and retrofit work. The average personal doses of the internal staff as well as of the external staff showed quite favourable values also in comparison to the previous years. The increased average personal doses occurred generally in the older plants. This is caused, on the one hand, by dose-intensive repair, replacement and retrofit work, on the other hand, it reflects the different deployment of labour. The dose values for the job doses of the inspection and maintenance work were within the range of the empirical and expected values. High dose values occurred in general only in retrofit measures, which were carried out namely because of obligations by the regulatory authority. Only a small proportion of the collective dose was due to repair work. In the case of the BWR, the dose values for the job doses of fuel element replacement, maintenance and inspection work were within the range of the empirical and expected values. Retrofit and repair work did not contribute much to the collective dose. (orig./HP) [de

  13. Energy Saving Performance Analysis of An Inverter-based Regenerative Power Re-utilization Device for Urban Rail Transit

    Science.gov (United States)

    Li, Jin; Qiu, Zhiling; Hu, Leilei

    2018-04-01

    The inverter-based regenerative braking power utilization devices can re-utilize the regenerative energy, thus reduce the energy consumption of urban rail transit. In this paper the power absorption principle of the inverter-based device is introduced, then the key influencing factors of energy saving performance are analyzed based on the absorption model. The field operation data verified that the control DC voltage plays an important role and lower control DC voltage yields more energy saving. Also, the one year energy saving performance data of an inverter-based re-utilization device located in NanJing S8 line is provided, and more than 1.2 million kWh energy is recovered in the one year operation.

  14. Music to Teach German By.

    Science.gov (United States)

    Schulte, Leo

    1985-01-01

    Discusses how music can be intergrated with regular lesson plans to teach German vocabulary, grammar, and history and to give insights into German culture. Also included are sources for basic background information, a list of recordings of the German music, and notes on selecting and presenting it in the language class. (SED)

  15. Statistical Analysis of the Impact of Wind Power on Market Quantities and Power Flows

    DEFF Research Database (Denmark)

    Pinson, Pierre; Jónsson, Tryggvi; Zugno, Marco

    2012-01-01

    In view of the increasing penetration of wind power in a number of power systems and markets worldwide, we discuss some of the impacts that wind energy may have on market quantities and cross-border power flows. These impacts are uncovered through statistical analyses of actual market and flow data...... of load and wind power forecasts on Danish and German electricity markets....

  16. Power Flow Distribution Strategy for Improved Power Electronics Energy Efficiency in Battery Storage Systems: Development and Implementation in a Utility-Scale System

    Directory of Open Access Journals (Sweden)

    Michael Schimpe

    2018-03-01

    Full Text Available Utility-scale battery storage systems typically consist of multiple smaller units contributing to the overall power dispatch of the system. Herein, the power distribution among these units is analyzed and optimized to operate the system with increased energy efficiency. To improve the real-life storage operation, a holistic system model for battery storage systems has been developed that enables a calculation of the energy efficiency. A utility-scale Second-Life battery storage system with a capacity of 3.3 MWh/3 MW is operated and evaluated in this work. The system is in operation for the provision of primary control reserve in combination with intraday trading for controlling the battery state of charge. The simulation model is parameterized with the system data. Results show that losses in power electronics dominate. An operational strategy improving the energy efficiency through an optimized power flow distribution within the storage system is developed. The power flow distribution strategy is based on the reduction of the power electronics losses at no-load/partial-load by minimizing their in-operation time. The simulation derived power flow distribution strategy is implemented in the real-life storage system. Field-test measurements and analysis prove the functionality of the power flow distribution strategy and reveal the reduction of the energy throughput of the units by 7%, as well as a significant reduction of energy losses in the units by 24%. The cost savings for electricity over the system’s lifetime are approximated to 4.4% of its investment cost.

  17. QoS-Guaranteed Power Control Mechanism Based on the Frame Utilization for Femtocells

    Directory of Open Access Journals (Sweden)

    Mach Pavel

    2011-01-01

    Full Text Available The paper focuses on a power control mechanism and proposes a novel approach for dynamic adaptation of femtocells' transmitting power. The basic idea is to adapt the transmitting power of femtocells according to current traffic load and signal quality between user equipments and the femtocell in order to fully utilize radio resources allocated to the femtocell. The advantage of the proposed scheme is in provisioning of high quality of service level to the femtocell users, while interference to users attached to macrobase station is minimized. The paper proposes the power adaptation algorithm and evaluates its performance in terms of mobility events, achieved throughput, and FAPs transmitting power. Performed simulations show that the proposed scheme can significantly reduce the number of mobility events caused by passerby users and thus to minimize signaling overhead generated in the network. In addition, our proposal enhances overall throughput for most of the investigated scenarios in comparison to other power control schemes.

  18. Soft power geopolitics: how does the diminishing utility of military power affect the Russia – West confrontation over the “Common Neighbourhood”

    OpenAIRE

    Vasif HUSEYNOV

    2016-01-01

    This paper is based on the fact that a number of factors, but particularly the restricting utility of military force between great powers, increase the significance of soft power as a tool both for legitimization and expansion in international relations in general, and in the West – Russia confrontation over the “common (or shared) neighbourhood” in particular. It explores how this fact affects the policies of the Western powers and Russia within the frame of the confrontation they are in. Th...

  19. Owners of nuclear power plants: Percentage ownership of commercial nuclear power plants by utility companies

    International Nuclear Information System (INIS)

    Wood, R.S.

    1987-08-01

    The following list indicates percentage ownership of commercial nuclear power plants by utility companies as of June 1, 1987. The list includes all plants licensed to operate, under construction, docked for NRC safety and environmental reviews, or under NRC antitrust review. It does not include those plants announced but not yet under review or those plants formally canceled. In many cases, ownership may be in the process of changing as a result of altered financial conditions, changed power needs, and other reasons. However, this list reflects only those ownership percentages of which the NRC has been formally notified. Part I lists plants alphabetically with their associated applicants/licensees and percentage ownership. Part II lists applicants/licensees alphabetically with their associated plants and percentage ownership. Part I also indicates which plants have received operating licenses (OL's). Footnotes for both parts appear at the end of this document

  20. "Frequent frames" in German child-directed speech: a limited cue to grammatical categories.

    Science.gov (United States)

    Stumper, Barbara; Bannard, Colin; Lieven, Elena; Tomasello, Michael

    2011-08-01

    Mintz (2003) found that in English child-directed speech, frequently occurring frames formed by linking the preceding (A) and succeeding (B) word (A_x_B) could accurately predict the syntactic category of the intervening word (x). This has been successfully extended to French (Chemla, Mintz, Bernal, & Christophe, 2009). In this paper, we show that, as for Dutch (Erkelens, 2009), frequent frames in German do not enable such accurate lexical categorization. This can be explained by the characteristics of German including a less restricted word order compared to English or French and the frequent use of some forms as both determiner and pronoun in colloquial German. Finally, we explore the relationship between the accuracy of frames and their potential utility and find that even some of those frames showing high token-based accuracy are of limited value because they are in fact set phrases with little or no variability in the slot position. Copyright © 2011 Cognitive Science Society, Inc.

  1. Product bundling, the key to a successful multi-utility strategy; Buendelung: Der Schluessel zu einer erfolgreichen Multi Utility-Strategie

    Energy Technology Data Exchange (ETDEWEB)

    Laker, M.; Nigge, K.M.; Wuebker, G. [Simon, Kucher und Partner Strategy and Marketing Consultants GmbH, Berlin (Germany)

    2002-04-01

    The article explains essential aspects of successful multi-utility management strategies for local utilities. Product bundling and the creation of incentives for enhancing the consumers' propensity to conclude multi-utility contracts, as e.g. pricing policy and the range of services that can be offered in a package are discussed. (orig./CB) [German] Das Thema Multi Utility, d.h. die Integration von Strom, Erdgas, Wasser, Entsorgung und Dienstleistungen wird ausfuehrlich diskutiert. Es muessen vielmehr Anreize dafuer geschaffen werden, dass die Kunden die Komplettangebote auch wahrnehmen. Dies ist eine Frage der Produkt- und Preisgestaltung. Buendelung ist das ideale Instrument zur Schaffung solcher Anreize. (orig./CB)

  2. Unit commitment and investment valuation of flexible biogas plants in German power markets

    Energy Technology Data Exchange (ETDEWEB)

    Hochloff, Patrick

    2017-07-01

    Biogas plants contribute a significant share of renewable energy sources (RES) to the electricity system. Most of them are designed to supply constant power generation. In the future biogas plants will most likely become more flexible, scheduling their power generation with respect to market prices. For this purpose power units need extended electrical capacity to convert the continuously produced gas as well as the gas held in storage. When constructing extended capacity at biogas plants, the flexibility premium is the main focus for about 8000 plants which were constructed before August 2014. Additional incomes as a result of selling at higher market prices have been considered, too. However, their relationship to the electrical capacity and storage size of biogas plants was unknown as was the impact on investment valuation. This work has shown how biogas plants with extended capacity can be analyzed when they are operated in power markets, in particular the power spot market and the control reserve markets. Models on the basis of unit commitment have been developed in order to obtain optimized schedules and financial parameters, such as gross income and net present value (NPV), when biogas plants with extended capacity capitalize on prices in each market. The models developed consider several use cases that describe possible ways of participating in German power markets, switching between static and variable gas supply, providing secondary and tertiary control reserve, and claiming the market and flexibility premium. Mixed integer linear programs (MILP) have been developed for the unit commitment of each use case. The model for the unit commitment of providing control reserve with biogas plants made significant progress compared to the state of the art and has been published in (Hochloff, Braun 2014). There are two ways to make use of this model. First of all, the model could be applied to plan daily schedules for the operation of gas plants located at a gas

  3. Unit commitment and investment valuation of flexible biogas plants in German power markets

    International Nuclear Information System (INIS)

    Hochloff, Patrick

    2017-01-01

    Biogas plants contribute a significant share of renewable energy sources (RES) to the electricity system. Most of them are designed to supply constant power generation. In the future biogas plants will most likely become more flexible, scheduling their power generation with respect to market prices. For this purpose power units need extended electrical capacity to convert the continuously produced gas as well as the gas held in storage. When constructing extended capacity at biogas plants, the flexibility premium is the main focus for about 8000 plants which were constructed before August 2014. Additional incomes as a result of selling at higher market prices have been considered, too. However, their relationship to the electrical capacity and storage size of biogas plants was unknown as was the impact on investment valuation. This work has shown how biogas plants with extended capacity can be analyzed when they are operated in power markets, in particular the power spot market and the control reserve markets. Models on the basis of unit commitment have been developed in order to obtain optimized schedules and financial parameters, such as gross income and net present value (NPV), when biogas plants with extended capacity capitalize on prices in each market. The models developed consider several use cases that describe possible ways of participating in German power markets, switching between static and variable gas supply, providing secondary and tertiary control reserve, and claiming the market and flexibility premium. Mixed integer linear programs (MILP) have been developed for the unit commitment of each use case. The model for the unit commitment of providing control reserve with biogas plants made significant progress compared to the state of the art and has been published in (Hochloff, Braun 2014). There are two ways to make use of this model. First of all, the model could be applied to plan daily schedules for the operation of gas plants located at a gas

  4. Commercialization of PV-powered pumping systems for use in utility PV service programs. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The project described in this report was a commercialization effort focused on cost-effective remote water pumping systems for use in utility-based photovoltaic (PV) service programs. The project combined a commercialization strategy tailored specifically for electric utilities with the development of a PV-powered pumping system that operates conventional ac pumps rather than relying on the more expensive and less reliable PV pumps on the market. By combining these two attributes, a project goal was established of creating sustained utility purchases of 250 PV-powered water pumping systems per year. The results of each of these tasks are presented in two parts contained in this Final Summary Report. The first part summarizes the results of the Photovoltaic Services Network (PSN) as a new business venture, while the second part summarizes the results of the Golden Photon system installations. Specifically, results and photographs from each of the system installations are presented in this latter part.

  5. Reactor safety in industrial nuclear power plants. Developments in a political and technical environment as it prevails in the German Federal Republic

    International Nuclear Information System (INIS)

    Laufs, Paul

    2013-01-01

    The present book describes the development of reactor safety in German light-water nuclear power plants from the beginnings with its multifarious links to model solutions seen in other countries, national and international research projects and accidents in conventional and nuclear power plants. It contains detailed, richly illustrated articles on specific safety techniques such as rupture safety of the pressurised envelope, safeguarding of emergency cooling in the event of accidents involving coolant loss, control technology and protection of the surroundings through containment. The results of national and international risk studies are discussed. It is shown how efforts on the part of industry, government and science to enhance safety resources and improve safety culture have been driven by a civic environment in which the use of nuclear energy has become a central issue of political debate. The book is written in readily comprehensible language and offers a wealth of material for further study.

  6. The trend of energy and power situation in the world (2)

    International Nuclear Information System (INIS)

    2011-01-01

    It consists of four chapters such as nuclear power generation in the world, development of nuclear power and risk deduction policy at market liberalization, the trend of nuclear power generation in each country and the trend of renewable energy in each country. The nuclear power generation in the world was 432 units in operation and 66 units under construction and 38,916 million kW of total generating capacity, a decrease of 129 million kW compared with the previous year. Asian area and old U.S.S.R are building many units. The trends of nuclear power generation of USA, England, France, German, Sweden, Russia, East Europe, Korea, and China are stated. The renewable Energy of USA, England, France, German, and China are reported. The nuclear power plants in the world, risk deduction policy and raising capital for development of nuclear power, the nuclear power plants in operation in China, national renewable energy action plan for the United Kingdom, and the share of renewable energy in each field in German are illustrated. (S.Y.)

  7. Husum wind power meeting 1991: Wind power in impetus. Husumer Windenergietage 1991: Windkraft im Aufwind

    Energy Technology Data Exchange (ETDEWEB)

    Bloos, L

    1991-11-01

    Although, within the last 2 years, the generation of electricity has made a considerable progress in Schleswig-Holstein, the capacity connected to the network is 1% of the electricity consumption. But now, after the commercial utilization of wind energy seems to get going, resistances and defiles become evident. On the one hand, this concerns reservations of the protectors of birds who are afraid of an interference of protected coastal birds as well as the limited ability of the existing network. In so far, the ability of transfer into the network limits the size of the wind park or their number. A further restriction through the support program of the 250 MW of the Federal government results from the incentive that predominantly German firms have to be considered when erecting wind power plants. (BWI).

  8. Is there a need for government interventions to adapt energy infrastructures to climate change? A German case study

    Science.gov (United States)

    Groth, Markus; Cortekar, Jörg

    2015-04-01

    The option of adapting to climate change is becoming more and more important in climate change policy. Hence, responding to climate change now involves both mitigation to address the cause and adaptation as a response to already ongoing and expected changes. These changes also have relevance for the current and future energy sector in Germany. An energy sector that in the course of the German Energiewende also has to deal with a fundamental shift in energy supply from fossil fuel to renewable energies in the next decades. Thereby it needs to be considered that the energy sector is one critical infrastructure in the European Union that needs to be protected. Critical infrastructures can be defined as organisations or facilities of special importance for the country and its people where failure or functional impairment would lead to severe supply bottlenecks, significant disturbance of public order or other dramatic consequences. Regarding the adaptation to climate change, the main question is, whether adaptation options will be implemented voluntarily by companies or not. This will be the case, when the measure is considered a private good and is economically beneficial. If, on the contrary, the measure is considered a public good, additional incentives are needed. Based on a synthesis of the current knowledge regarding the possible impacts of climate change on the German energy sector along its value-added chain, the paper points out, that the power distribution and the grid infrastructure is consistently attributed the highest vulnerability. Direct physical impacts and damages to the transmission and distribution grids, utility poles, power transformers, and relay stations are expected due to more intense extreme weather events like storms, floods or thunderstorms. Furthermore fundaments of utility poles can be eroded and relay stations or power transformers can be flooded, which might cause short circuits etc. Besides these impacts causing damage to the physical

  9. How do German bilingual schoolchildren process German prepositions? - A study on language-motor interactions.

    Science.gov (United States)

    Ahlberg, Daniela Katharina; Bischoff, Heike; Strozyk, Jessica Vanessa; Bryant, Doreen; Kaup, Barbara

    2018-01-01

    While much support is found for embodied language processing in a first language (L1), evidence for embodiment in second language (L2) processing is rather sparse. In a recent study, we found support for L2 embodiment, but also an influence of L1 on L2 processing in adult learners. In the present study, we compared bilingual schoolchildren who speak German as one of their languages with monolingual German schoolchildren. We presented the German prepositions auf (on), über (above), and unter (under) in a Stroop-like task. Upward or downward responses were made depending on the font colour, resulting in compatible and incompatible trials. We found compatibility effects for all children, but in contrast to the adult sample, there were no processing differences between the children depending on the nature of their other language, suggesting that the processing of German prepositions of bilingual children is embodied in a similar way as in monolingual German children.

  10. Modern combined cycle power plant utilizing the GT11N2

    International Nuclear Information System (INIS)

    Goodwin, J.C.

    1992-01-01

    The requirement imposed on modern power plants are increasingly demanding. The limits of: efficiency; environmental sensitivity; reliability and availability; are constantly being pushed. Today's state of the art combined cycle power plants are positioned well to meet these challenges. This paper reports that these objectives can be achieved through the selection of the proper gas turbine generator in an optimized cycle concept. A balanced approach to the plant design is required. It must not sacrifice any one of these requirements, in order to achieve the others. They achieve their fullest potential when firing a clean fuel, natural gas. However, fuel oil, both light (No. 2) and heavy (No. 6), can be utilized but some efficiency and environmental impact will have to be sacrificed

  11. Enduring Power of Attorney (EPoA – comparison between Austrian and German Law

    Directory of Open Access Journals (Sweden)

    Michael Ganner

    2015-04-01

    Full Text Available ENGLISH: With the establishment of the United Nations Convention on the Rights of Persons with Disabilities (CRPD the treatment of people with disabilities is changing from a protective perspective to a rights - based approach. The Enduring Power of Attorney (EPoA is an important instrument, which helps with the implementation of the CRPD into national law. As an instrument of self - determined substituted decision - making it is recognised as the best practice model to safeguard the autonomy of people suffering the deprivations of age and other disabilities. This article touches briefly on general supported and substituted decision - making instruments and then goes on to examine the differences and similarities, advantages and disadvantages b e- tween Austrian and German laws concerning EPoAs. DEUTSCH: Mit der Umsetzung der UN-Behindertenrechtskonvention findet ein Paradigmenwechsel und Umdenken im Umgang mit Personen mit Behinderungen statt. Der Primat der Fürsorge weicht einem liberalen, auf Menschenrechten basierenden Ansatz. In diesem Kontext ist die Vorsorgevollmacht ein effektives Mittel, das die Implementation der UN-Behindertenrechtskonvention in nationales Recht vorantreibt und die Selbstbestimmung und Eigenständigkeit altersbedingt eingeschränkter Menschen und von Menschen mit Behinderungen gewährleistet. Dieser Artikel beschäftigt sich einleitend mit allgemeinen Rechtsinstrumenten der (unterstützten Entscheidungsfindung bei nicht selbst entscheidungsfähigen Personen und analysiert in weiterer Folge Gemeinsamkeiten und Unterschiede sowie Vor- und Nachteile der Vorsorgevollmacht nach österreichischem und deutschem Recht.

  12. The electricity supply industry in the German Federal Republic in the year 1974

    International Nuclear Information System (INIS)

    Anon.

    1975-01-01

    The present report continues the series of the annual reports issued so far, in the same form and arrangement of the available statistical material, which have been published in 'Elektrizitaetswirtschaft' since 1950 and as special publication. On the basis of official data the report gives a statistical review of public electricity supply, the industrial private undertakings and the power supply to the German Federal Railways. By combining these three groups - after omitting any overlap of the available data - an overall review of the development of electricity supply in the whole of the German Federal Republic is made possible. (orig.) [de

  13. Compiling Utility Requirements For New Nuclear Power Plant Project

    International Nuclear Information System (INIS)

    Patrakka, Eero

    2002-01-01

    Teollisuuden Voima Oy (TVO) submitted in November 2000 to the Finnish Government an application for a Decision-in-Principle concerning the construction of a new nuclear power plant in Finland. The actual investment decision can be made first after a positive decision has been made by the Government and the Parliament. Parallel to the licensing process, technical preparedness has been upheld so that the procurement process can be commenced without delay, when needed. This includes the definition of requirements for the plant and preliminary preparation of bid inquiry specifications. The core of the technical requirements corresponds to the specifications presented in the European Utility Requirement (EUR) document, compiled by major European electricity producers. Quite naturally, an amount of modifications to the EUR document are needed that take into account the country- and site-specific conditions as well as the experiences gained in the operation of the existing NPP units. Along with the EUR-related requirements concerning the nuclear island and power generation plant, requirements are specified for scope of supply as well as for a variety of issues related to project implementation. (author)

  14. Power Struggle: Changing Momentum in the Restructured American Electric Utility System

    International Nuclear Information System (INIS)

    Hirsh, Richard F.

    2004-01-01

    Since the 1970's, producing and distributing electricity were considered as a natural monopoly. They were subjected to state regulation meant to defend the consumers' interest but which in reality enhanced the power of utility managers. The changes that happened since questioned the managers' control over the system. Following the technological stasis that occurred in the production of electricity, the oil crisis, and the awakening of the environmental movement, the Government adopted the Public Utility Regulatory Policies Act in 1978, favoring the coming of cogeneration technologies benefiting the small producers. Market economy tended to replace natural monopoly. Deregulation became a valuable option and was stimulated by the 1992 Energy Policy Act. However, the electrical crisis in California and the recent blackout over part of the continent slowed down the pace of the change

  15. Trends in Japan's power generation costs after the Fukushima Daiichi Nuclear Power Plant accident and their influence on finance of electric utilities

    International Nuclear Information System (INIS)

    Matsuo, Yuhji; Yamaguchi, Yuhji; Murakami, Tomoko

    2013-01-01

    Following the Fukushima Daiichi nuclear power plant accident, the nuclear reactors that were suspended for periodic inspections after the Fukushima accident were not permitted to resume operation, and nuclear power generation in Japan continued to decline. In this article, the authors quantitatively evaluated the effects on power generation costs of Japan's situation, using electric utilities financial reports up to FY 2011. We also analyzed the profitability of the Japanese electric industry, using the financial statements included in the reports, and quantitatively evaluated the effects of changes in power generation costs. The total cost of power generation has increased from 7.5 trillion yen in FY 2010 before the Fukushima accident to 9.6 trillion yen in FY 2011 and to 10.6 trillion yen in FY 2012. In particular, the fuel cost for thermal power generation rose sharply from 3.7 trillion yen in FY 2010 to 6.1 trillion yen in FY 2011 and 7.3 trillion yen in FY 2012, almost doubling in the two years from FY 2010 to 2012. The unit cost of power generation rose sharply from 8.6 yen/kWh in FY 2010 to 11.8 yen/kWh in FY 2011 and 13.5 yen/kWh in FY 2012. The unit cost is expected to rise even further in FY 2013 due to the weak yen. As the result not only Tokyo Electric Power Company, but also the other general electric utilities registered huge net losses. Their retained earnings (total of eight utilities) dropped by 2 trillion yen between FY 2010 and 2012. With increased thermal power generation, the risk of rising costs associated with changes in primary energy prices and exchange rates has increased drastically. For the stability of the electricity industry and the development of the Japanese economy, the government should clearly formulate a basic policy regarding the composition of power sources, and an effective plan both at home and abroad, and should develop a system that will be also to handle sudden changes in the composition of power sources. (author)

  16. Utilization of waste heat from nuclear power plants in agriculture

    International Nuclear Information System (INIS)

    Horacek, P.

    1981-01-01

    The development of nuclear power will result in the relative and absolute increase in the amount of waste heat which can be used in agriculture for heating greenhouses, open spaces, for fish breeding in heated water, for growing edible mushrooms, growing algae, for frost protection of orchards, air conditioning of buildings for breeding livestock and poultry, and for other purposes. In addition of the positive effect of waste heat, the danger increases of disease, weeds and pests. Pilot plant installations should be build in Czechoslovakia for testing the development of waste heat utilization. (Ha)

  17. The energy inquiry of the West German Parliament

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    The work of the enquiry commission of the West German parliament has found littel positive resonance. While the public has hardly taken notice of the commission's recommendations, experts are accusing it of having delayed the decision on nuclear power, yes or no until the year 1990. Members of the commission and opponents of its work have been invited to a symposium in the home of the publisher of Bild der Wissenschaft , Prof. Dr. Heinz Haber, in Hamburg. (orig.) [de

  18. Innovation paths in wind power

    DEFF Research Database (Denmark)

    Lema, Rasmus; Nordensvärd, Johan; Urban, Frauke

    Denmark and Germany both make substantial investments in low carbon innovation, not least in the wind power sector. These investments in wind energy are driven by the twin objectives of reducing carbon emissions and building up international competitive advantage. Support for wind power dates back....... The ‘Danish Design’ remains the global standard. The direct drive design, while uncommon in Denmark, dominates the German installation base. Direct drive technology has thus emerged as a distinctly German design and sub-trajectory within the overall technological innovation path. When it comes to organising...... global interconnectedness of wind technology markets and the role of emerging new players, such as China and India....

  19. A strategy different from France's: German energy policy

    International Nuclear Information System (INIS)

    Linkohr, R.

    2013-01-01

    Shortly after the Fukushima accident, the German chancellor, Angela Merkel, announced a new course for the country's energy policy: nuclear power is to be fully abandoned by 2022, owing to a massive recourse to renewable sources of energy. The proclaimed goal is for renewable energy to make up 35% of the country's energy mix by 2035 and even 80% by 2050. This energy transition, though benefiting from a consensus, has run up against several difficulties: an unadapted electric power grid, the excessively high costs of investment, and exorbitant electricity rates for consumers.... Till now, this energy policy's basis principles have not come under question, but questioning are arising about the pace and cost of this transformation. (author)

  20. UMCP-BG and E collaboration in nuclear power engineering in the framework of DOE-Utility Nuclear Power Engineering Education Matching Grant Program

    Energy Technology Data Exchange (ETDEWEB)

    Wolfe, Lothar PhD

    2000-03-01

    The DOE-Utility Nuclear Power Engineering Education Matching Grant Program has been established to support the education of students in Nuclear Engineering Programs to maintain a knowledgeable workforce in the United States in order to keep nuclear power as a viable component in a mix of energy sources for the country. The involvement of the utility industry ensures that this grant program satisfies the needs and requirements of local nuclear energy producers and at the same time establishes a strong linkage between education and day-to-day nuclear power generation. As of 1997, seventeen pairs of university-utility partners existed. UMCP was never a member of that group of universities, but applied for the first time with a proposal to Baltimore Gas and Electric Company in January 1999 [1]. This proposal was generously granted by BG&E [2,3] in the form of a gift in the amount of $25,000 from BG&E's Corporate Contribution Program. Upon the arrival of a newly appointed Director of Administration in the Department of Materials and Nuclear Engineering, the BG&E check was deposited into the University's Maryland Foundation Fund. The receipt of the letter and the check enabled UMCP to apply for DOE's matching funds in the same amount by a proposal.

  1. German risk study for nuclear power plants. Vol. 5

    International Nuclear Information System (INIS)

    Bracht, K.F.; Javeri, V.; Keusenhoff, J.; Meier, S.; Roehrs, W.; Scharfe, A.; Tiltmann, M.; Mayinger, F.

    1980-01-01

    This appendix contains the analyses on core melt accidents carried out for the German risk study. These accidents constitute a major portion of the event sequences relevant to the risk. It deals, in particular, with the processes involved in the reactor core melt, the behaviour of the containment vessel including the possible types of failures, and the consequences of possible steam explosions. The investigations were performed for limiting cases for which a complete failure of the emergency core cooling and residual heat removal system is anticipated. Under these conditions, the reactor core melts down and penetrates the reactor pressure vessel bottom. In the course of the following interaction between core melt and concrete foundation, the melt is assumed to come into contact with the sump water. The evaporation of the sump water leads to an overpressure failure of the containment vessel within approximately one day after accident initiation. A destruction of the containment as a consequence of a steam explosion is considered highly unprobable. (orig.) [de

  2. Next-Generation Performance-Based Regulation: Emphasizing Utility Performance to Unleash Power Sector Innovation

    Energy Technology Data Exchange (ETDEWEB)

    Logan, Jeffrey S [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Zinaman, Owen R [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Littell, David [Regulatory Assistance Project (RAP), Montpelier, VT (United States); Kadoch, Camille [Regulatory Assistance Project (RAP), Montpelier, VT (United States); Baker, Phil [Regulatory Assistance Project (RAP), Montpelier, VT (United States); Bharvirkar, Ranjit [Regulatory Assistance Project (RAP), Montpelier, VT (United States); Dupuy, Max [Regulatory Assistance Project (RAP), Montpelier, VT (United States); Hausauer, Brenda [Regulatory Assistance Project (RAP), Montpelier, VT (United States); Linvill, Carl [Regulatory Assistance Project (RAP), Montpelier, VT (United States); Migden-Ostrander, Janine [Regulatory Assistance Project (RAP), Montpelier, VT (United States); Rosenow, Jan [Regulatory Assistance Project; Xuan, Wang [Regulatory Assistance Project

    2017-09-12

    Performance-based regulation (PBR) enables regulators to reform hundred-year-old regulatory structures to unleash innovations within 21st century power systems. An old regulatory paradigm built to ensure safe and reliable electricity at reasonable prices from capital-intensive electricity monopolies is now adjusting to a new century of disruptive technological advances that change the way utilities make money and what value customers expect from their own electricity company. Advanced technologies are driving change in power sectors around the globe. Innovative technologies are transforming the way electricity is generated, delivered, and consumed. These emerging technology drivers include renewable generation, distributed energy resources such as distributed generation and energy storage, demand-side management measures such as demand-response, electric vehicles, and smart grid technologies and energy efficiency (EE). PBR enables regulators to recognize the value that electric utilities bring to customers by enabling these advanced technologies and integrating smart solutions into the utility grid and utility operations. These changes in the electric energy system and customer capacities means that there is an increasing interest in motivating regulated entities in other areas beyond traditional cost-of-service performance regulation. This report addresses best practices gleaned from more than two decades of PBR in practice, and analyzes how those best practices and lessons can be used to design innovative PBR programs. Readers looking for an introduction to PBR may want to focus on Chapters 1-5. Chapters 6 and 7 contain more detail for those interested in the intricate workings of PBR or particularly innovative PBR.

  3. A Method of Maximum Power Control in Single-phase Utility Interactive Photovoltaic Generation System by using PWM Current Source Inverter

    Science.gov (United States)

    Neba, Yasuhiko

    This paper deals with a maximum power point tracking (MPPT) control of the photovoltaic generation with the single-phase utility interactive inverter. The photovoltaic arrays are connected by employing the PWM current source inverter to the utility. The use of the pulsating dc current and voltage allows the maximum power point to be searched. The inverter can regulate the array voltage and keep the arrays to the maximum power. This paper gives the control method and the experimental results.

  4. Utility-scale variable-speed wind turbines using a doubly-fed generator with a soft-switching power converter

    Energy Technology Data Exchange (ETDEWEB)

    Weigand, C.H.; Lauw, H.K.; Marckx, D.A. [Electronic Power Conditioning, Inc., Corvallis, OR (United States)

    1996-12-31

    Utility-scale wind turbines operating at variable RPM have been studied for a considerable period of time. Whereas the increase in energy output originally has been considered the principal benefit of variable-speed operation, the ability to tightly control the drive-train torque by electronic means is becoming another very important cost factor, especially for turbine ratings above 500 kilowatts. This cost benefit becomes even more significant as optimum turbine ratings today are approaching (and surpassing) 1 Megawatt. Having identified the benefits for the turbine, the designer is confronted with the task of finding the most cost-effective variable-speed generation system which allows him to make use of the benefits, yet does not introduce well-known electrical problems associated with state-of-the-art variable-speed generator controls, such as drastically reduced generator winding life, excessive harmonics on the utility, and poor utility power factor. This paper will indicate that for high-power (> 500 kW), utility-scale wind turbines a doubly-fed generator system in connection with a soft-switching resonant power converter is the least-cost variable-speed generation system offering all of the desired benefits, yet avoids the introduction of the potential electrical problems stated above. 3 refs., 3 figs., 1 tab.

  5. Power System Operation with Large Scale Wind Power Integration

    DEFF Research Database (Denmark)

    Suwannarat, A.; Bak-Jensen, B.; Chen, Z.

    2007-01-01

    to the uncertain nature of wind power. In this paper, proposed models of generations and control system are presented which analyze the deviation of power exchange at the western Danish-German border, taking into account the fluctuating nature of wind power. The performance of the secondary control of the thermal......The Danish power system starts to face problems of integrating thousands megawatts of wind power, which produce in a stochastic behavior due to natural wind fluctuations. With wind power capacities increasing, the Danish Transmission System Operator (TSO) is faced with new challenges related...... power plants and the spinning reserves control from the Combined Heat and Power (CHP) units to achieve active power balance with the increased wind power penetration is presented....

  6. Geothermal energy utilized in the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Schulz, R.

    1990-01-01

    This paper reports on the geothermal resources and reserves that have been estimated for selected aquifers in the Northwest German Basin, the Upper Rhine Graben and the South German Molasse Basin. The highest reserves (31 · 10 18 J) are located in the Malm aquifer in the Molasse Basin. Geothermal energy is utilized in 15 localities using low enthalpy water. The total installed capacity is about 8 MW t . Two small new installations (Waldsee, Weiden) have been realized in the last years. In another project (Bruchsal) the doublet, which is necessary because of the high saline water, is now in a working order. A prefeasibility study for a Hot Dry Rock system has been performed by a German-French group. The HDR test site is located in the Upper Rhine Graben

  7. Design description of the European pressurized water reactor

    International Nuclear Information System (INIS)

    Leverenz, R.

    1999-01-01

    The EPR (the European Pressurized Water Reactor) is an evolutionary PWR developed by Nuclear Power International and its parent companies, Framatome and Siemens, in co-operation with Electricite de France and German Utilities. NPI can rely on the huge experience gained by its parent companies; they have constructed more than 100 nuclear power plants throughout the world. The total installed capacity exceeds 100,000 MW - about 25% of the total world-wide figure. Following the conceptual design phase of the so-called Common Product conducted by NPI, Framatome and Siemens, from 1989 through 1991, Electricite de France (EDF) and several major German utilities decided to merge their own development programmes, - the N4 Plus and REP 2000 projects on the French side and the further development of the KONVOI technology on the German side, - with the NPI project. From that time on, the NPI project became one single common development line for both countries. In parallel, EDF and the German utilities decided to establish, together with other European utilities, specifications that would represent common utility views on the design and performance of future nuclear power plants. These are documented in the European Utility Requirements (EURs). The basic design has been completed in 1997, and in 1998 a design optimization is being carried out with the goal to even increase the economic competitiveness of nuclear power. This paper provides a brief design description of the EPR. (author)

  8. The opening of the debates on the extension of German nuclear plant lifetime

    International Nuclear Information System (INIS)

    Guidez, J.

    2010-01-01

    After having recalled that the German nuclear plants were to be progressively stopped by 2021, the author reports that the political coalition has thrown this Agenda back into question, because the development of alternative energies is insufficient to compensate the programmed closing down, and the German government wants to avoid the use of thermal plants which are generating CO 2 emissions. Negotiations are underway between the German government and the four electric companies in charge of different plants. It appears that even plants which were to be stopped in 2010, could keep on operating. The report contains tables indicating, for each nuclear plant, its type, its operator, its power, its dates of beginning and programmed end of commercial activity, its production variation in time. Some comments are given about already stopped reactors (Brunsbuttel and Krummel) which faced some problems in the past, and about waste storing sites (Asse, Gorleben, Morsleben, Konrad)

  9. The German 'Energiewende' from central European perspective

    Energy Technology Data Exchange (ETDEWEB)

    Szynol, Kazimierz [TAURON Wytwarzanie S.A., Jaworzno (Poland)

    2014-03-15

    Germany is a country of an exceptional economic significance for Europe and the entire world therefore everything that takes place in this country is carefully analyzed and investigated especially in the Central Europe. Hundreds of thousands workplaces in EU-11 are directly or indirectly connected with German economy present in those countries. That is why an unquestionable revolution in the power sector, i.e. Energiewende, is of importance to us both at present and in the future. The present article presents comparison of installed capacity, generation of electrical energy and power systems in Germany and EU-11. The article also assesses the differences regarding economic development of the aforementioned countries presenting the EU-11's understanding of what Energiewende is and what its objectives are. In addition, the article includes impartial evaluation of problems related to Energiewende and its outcome for the German economy and society. Due to considerable differences regarding economic development, it is hard to imagine a similar revolution taking place in EU-11. Therefore, a compromise with respect to European energy and climate policy acceptable for EU-11, Germany and the entire Europe is of the utmost necessity and the author is convinced that such a compromise is achievable. (orig.)

  10. Markets: green utilities

    International Nuclear Information System (INIS)

    Wood, Elisa

    2006-01-01

    Publicly owned utilities have consistently led the United States in the rate of customer participation in green power programmes. The US has about 2000 community and state-owned utilities, which serve 43 million customers and account for about 16.6% of kilowatt-hour sales to consumers. In all, public power is responsible for about 10% of the nation's installed electric capacity. Investor owned utilities account for 39%, with the remainder of the nation's power mostly from independent power generators. Although IOUs have almost four times as much electric capacity as public power, they edge out public power by only a small margin when it comes to renewable capacity. IOUs are responsible for 24,577.5 MW of renewable capacity, compared to the 21,338 MW installed by public power. The reasons discussed by the author range from small town advantage to clean and cheap power. (Author)

  11. Layers of root nouns in Germanic

    DEFF Research Database (Denmark)

    Hansen, Bjarne Simmelkjær Sandgaard

    2017-01-01

    The root-noun declension became productive in early Germanic, containing (I) inherited root nouns, (IIa) original substrate or loan words, and transitions from other declensions in (IIb) Proto-Germanic and (III) North Germanic. As ablaut was abolished, the inherited type would display ablaut grades...

  12. Numerical approach to optimal portfolio in a power utility regime-switching model

    Science.gov (United States)

    Gyulov, Tihomir B.; Koleva, Miglena N.; Vulkov, Lubin G.

    2017-12-01

    We consider a system of weakly coupled degenerate semi-linear parabolic equations of optimal portfolio in a regime-switching with power utility function, derived by A.R. Valdez and T. Vargiolu [14]. First, we discuss some basic properties of the solution of this system. Then, we develop and analyze implicit-explicit, flux limited finite difference schemes for the differential problem. Numerical experiments are discussed.

  13. Description of the retest instruction for the safety injection system in a German PWR

    International Nuclear Information System (INIS)

    Buettner, W.E.

    1982-01-01

    This report is a detailed supplement to the report 'Retests for a Safety System in a German Nuclear Power Plant' presented at the CSNI Meeting of the Group of Experts on Human Error Data and Assessment, Paris, Sept. 1979. (orig./RW)

  14. Measurement-based harmonic current modeling of mobile storage for power quality study in the distribution system

    Directory of Open Access Journals (Sweden)

    Wenge Christoph

    2017-12-01

    Full Text Available Electric vehicles (EVs can be utilized as mobile storages in a power system. The use of battery chargers can cause current harmonics in the supplied AC system. In order to analyze the impact of different EVs with regardto their number and their emission of current harmonics, a generic harmonic current model of EV types was built and implemented in the power system simulation tool PSS®NETOMAC. Based on the measurement data for different types of EVs three standardized harmonic EV models were developed and parametrized. Further, the identified harmonic models are used by the computation of load flow in a modeled, German power distribution system. As a benchmark, a case scenario was studied regarding a high market penetration of EVs in the year 2030 for Germany. The impact of the EV charging on the power distribution system was analyzed and evaluated with valid power quality standards.

  15. Experimental study of the combined utilization of nuclear power heating plants for big towns and industrial complexes

    International Nuclear Information System (INIS)

    Neumann, J.; Barabas, K.

    1977-01-01

    The paper describes a comparison of nuclear power heating plants with an output corresponding to 1000MW(e) with plants of the same output using coal or oil. The economic aspects are compared, both as regards investment and operation costs. The comparison of the environmental aspects is performed on the atmospheric pollution from exhausts and gaseous emission and on the thermal pollutions in hydrosphere and atmosphere. Basic nuclear power plant schemes with two PWRs, each of 1500MW(th), are described. The plant supplies electric power and heat for factories and municipal heating systems (apartments, shops, and other auxiliary municipal facilities). At the same time the basic heat-flow diagram of a nuclear power heating plant is given, together with the relative losses. The study emphasizes the possible utilization of waste heat for heating glasshouses of 200m 2 . The problems of utilizing waste heat, and the needs of a big town and of industrial complexes in the vicinity of the nuclear power heating plant are also considered. (author)

  16. How do German bilingual schoolchildren process German prepositions? – A study on language-motor interactions

    Science.gov (United States)

    Bischoff, Heike; Strozyk, Jessica Vanessa; Bryant, Doreen; Kaup, Barbara

    2018-01-01

    While much support is found for embodied language processing in a first language (L1), evidence for embodiment in second language (L2) processing is rather sparse. In a recent study, we found support for L2 embodiment, but also an influence of L1 on L2 processing in adult learners. In the present study, we compared bilingual schoolchildren who speak German as one of their languages with monolingual German schoolchildren. We presented the German prepositions auf (on), über (above), and unter (under) in a Stroop-like task. Upward or downward responses were made depending on the font colour, resulting in compatible and incompatible trials. We found compatibility effects for all children, but in contrast to the adult sample, there were no processing differences between the children depending on the nature of their other language, suggesting that the processing of German prepositions of bilingual children is embodied in a similar way as in monolingual German children. PMID:29538404

  17. The innovation impact of the EU Emission Trading System. Findings of company case studies in the German power sector

    International Nuclear Information System (INIS)

    Rogge, Karoline S.; Schneider, Malte; Hoffmann, Volker H.

    2011-01-01

    This paper provides a detailed analysis of how the European Emission Trading System (EU ETS) as the core climate policy instrument of the European Union has impacted innovation. Towards this end, we investigate the impact of the EU ETS on research, development and demonstration (RD and D), adoption, and organizational change. In doing so, we pay particular attention to the relative influences of context factors (policy mix, market factors and public acceptance) and firm characteristics (value chain position, technology portfolio, size and vision). Empirically, our qualitative analysis is based on multiple case studies with 19 power generators, technology providers and project developers in the German power sector which were conducted in 2008/09. We find that the innovation impact of the EU ETS has remained limited so far because of the scheme's initial lack of stringency and predictability and the relatively greater importance of context factors. Additionally, the impact varies significantly across technologies, firms, and innovation dimensions and is most pronounced for RD and D on carbon capture technologies and organizational changes. Our analysis suggests that the EU ETS on its own may not provide sufficient incentives for fundamental changes in corporate innovation activities at a level which ensures political long-term targets can be achieved. (author)

  18. German energy turnaround and Poland's start in nuclear power? A survey; Deutschlands Energiewende und Polens Einstieg in die Kernenergie? Eine Bestandsaufnahme

    Energy Technology Data Exchange (ETDEWEB)

    Knopp, Lothar; Gorski, Marek (eds.)

    2015-07-01

    The book includes contributions from two meetings: 1. Meeting in Berlin, October 8,2014: Energy transition in Poland - historical background, development and actual situation; legal boundary conditions of the entry into nuclear power in Poland; ecologic and economic causes motivation for the atomic energy entry in Poland; promotion systems for renewable energy in Poland, current status and political background; construction of a nuclear power plant in Northern Poland site specific impacts and social assessment. Meeting in Stettin on November 5, 2014: Energy turnaround in Germany -German nuclear phaseout under consideration of EU legislation; ecologic and economic motivation for the energy turnaround in Germany; energy turnaround in Germany - new legal boundary conditions, especially the amendment to tue renewable energy law; contribution of the industry to the energy turnaround - taking the example waste management and waste incineration plants; fracking as a factor of the energy turnaround? - legal boundary conditions and ecologic risks; ecological, ethical and sociopolitical aspects of the energy turnaround in Germany and Poland.

  19. Device for district heating with utilization of waste heat from power plants

    International Nuclear Information System (INIS)

    Korek, J.

    1976-01-01

    In order to utilize the waste heat developing in power plants - especially in nuclear power plants - the author suggests to lead the waste heat of the coolers for oil (which the bearings are lubricated with), hydrogen (which serves for the stator rotor-cooling), and the stator cooling water to the circulating district heating water and to arrange these heat exchangers one behind another or parallel to each other in the water circuit of the district heating system. The oil cooler of the engine transformer is also connected with the circulation of the district heating water. The runback water of the district heating network could thus be heated from approx. 40 0 C up to 65 0 C. (UA) [de

  20. An integrated GIS environment enhancing the operation and planning of power utilities

    International Nuclear Information System (INIS)

    Yared, George Antoine

    1996-05-01

    The evolution of electrical power systems was tightly geared by the development of two fields: power engineering, with the advanced technology of physical elements comprising all parts of a power system, and information processing tools to manage the performance of electric power utilities. Compared to power engineering that has gone through tremendous developments, information technology applications for electrical power systems are relatively young. The possible improvements of these applications are in their graphical, mapping an data analysis capabilities. State-of-the art information technology such as Geographic Information Systems provides these facilities. The objective of this thesis is to devise a technique that combines power system software tools with the Geographic Information Systems software to enhance the operation, control and planning of electrical transmission systems. The load flow, voltage control and fault analysis models for the transmission system will be re-engineered in a Geographic Information System environment.The research is generic, special attention is given to its application to the Lebanese electrical power system, which is recovering from an infrastructure devastating war. The research entails integrating power systems analysis and control package, or PSACP developed at the AUB within a Geographic Information Systems environment. This will enhance the power modeling capabilities by the use of powerful thematic mapping, geographic and data analysis and user interface techniques that come with Geographic Information Systems. An overview of the two technologies involved is presented, followed by a detailed description of the integration technique before describing the integrated system. Moving to a higher level, the features of the system are presented, followed by sample applications of the integrated system on the Lebanese electrical power system. The thesis contributes to the research arena by developing a software re

  1. The European pressurized water reactor. Result of the French-German cooperation of experienced NPP suppliers and operators

    International Nuclear Information System (INIS)

    Fischer, U.

    1999-01-01

    In 1989 Framatome and Siemens, the two most experienced European nuclear power plant suppliers, decided to join the efforts for the development of a new reactor type for the next generation in their equally owned subsidiary nuclear power international (NPI). In 1992 Electricite de France and the major German utilities operating nuclear power plants merged their own development programs with that of nuclear power international and initiated the European pressurized water reactor (EPR) project. In order to reach the two major targets of the project, the licensability in both countries, France and Germany, and the competitiveness of nuclear energy with other alternative energy sources, the design basis which had differently developed in the two countries needed to be harmonized. In parallel, the licensing authorities of both countries extended their existing cooperation in the field of a safety survey of existing nuclear power plants to the definition of safety criteria for the next generation of nuclear power plants. Through this cooperation the licensability of EPR in France and Germany will be assured. Continuously performed cost analysis show in addition that also the second target of the project, the competitiveness with alternative primary energy sources, can be achieved. Thanks to the fruitful cooperation between all parties involved, satisfactory results have been achieved not by a simple superposition of existing design features but through a careful evaluation and combination of the best available alternatives. At the end of 1997 the basic design results were compiled in a final report. Subsequently an optimization phase was launched that further improves the competitiveness of the power generation costs. (orig.)

  2. EUR, an European utility requirements documents for future LWR power stations

    International Nuclear Information System (INIS)

    Berbey, Pierre; Lienard, Michel; Redon, Ramon; Essmann, Juergen; Taylor, David T.

    2004-01-01

    A group of the major European utilities are developing a common requirement document which will be used for the LWR nuclear power plants to be built in Europe from the beginning of the next century. This document provides harmonised policies and technical requirements that will allow the implementation of a design developed in one country into another one. The objectives and contents of the document, the organisation set up for its production and the main requirements are summarised in the paper. (author)

  3. Hitler's bomb: the secret story of Germans' attempts to get the nuclear weapon

    International Nuclear Information System (INIS)

    Karlsch, Rainer

    2007-01-01

    In this historical book, the author claims to have evidence concerning the development and testing of a possible 'nuclear weapon' by Nazi Germany in 1945. The 'weapon' in question is not alleged to be a standard nuclear weapon powered by nuclear fission, but something closer to either a radiological weapon (a so-called 'dirty bomb') or a hybrid-nuclear fusion weapon. Its new evidence is concerned primarily with the parts of the German nuclear energy project (an attempted clandestine scientific effort led by Germany to develop and produce atomic weapons during World War II) under Kurt Diebner, a German nuclear physicist who directed and administrated the project

  4. Utilization of uranium cost/benefit study for nuclear powered merchant ships. Special study

    International Nuclear Information System (INIS)

    Smith, E.R.

    1977-05-01

    This study presents a cost/benefit analysis for the utilization of uranium in merchant ships versus the use of uranium for the generation of electricity in central power stations. The study concludes that an alternative naval fuel to oil must be developed for the merchant marine to reduce U.S. dependency upon foreign supplies of a critical fuel. The study further indicates that use of uranium for ship propulsion results in transport of large quantities of needed import/exports while the residual oil saved will generate the same quantity of electricity in a central power station as the uranium used for ship propulsion

  5. Modular-multiplex or single large power plants-advantages and disadvantages for utility systems

    International Nuclear Information System (INIS)

    Endicott, R.D.

    1986-01-01

    The question of growing interest in the fusion community is what size and type configuration fusion reactor(s) will lead to the most economical and attractive fusion power plant? There are two sides to this question. One involves how to build the most economical and attractive fusion reactor. This question which requires evaluation of reactor components within the reactor system is being examined at the Fusion Engineering Design Center (FEDC) and elsewhere. The other side involves examining the issues associated with the most economical size and configuration reactor to use. This question requires the evaluation of the changes in cost of service due to different size and configuration reactors on a utility system. The authors objective was to explore the advantages and disadvantages of using modular-multiplex power plants and to illustrate a means of quantifying the tradeoffs. The effort resulted in the identification of the key parameters involved in selecting the optimum size plant for a utility system and a better understanding of the tradeoffs that are possible. This paper discusses this effort in detail

  6. Cross-linguistic vowel variation in trilingual speakers of Saterland Frisian, Low German, and High German.

    Science.gov (United States)

    Peters, Jörg; Heeringa, Wilbert J; Schoormann, Heike E

    2017-08-01

    The present study compares the acoustic realization of Saterland Frisian, Low German, and High German vowels by trilingual speakers in the Saterland. The Saterland is a rural municipality in northwestern Germany. It offers the unique opportunity to study trilingualism with languages that differ both by their vowel inventories and by external factors, such as their social status and the autonomy of their speech communities. The objective of the study was to examine whether the trilingual speakers differ in their acoustic realizations of vowel categories shared by the three languages and whether those differences can be interpreted as effects of either the differences in the vowel systems or of external factors. Monophthongs produced in a /hVt/ frame revealed that High German vowels show the most divergent realizations in terms of vowel duration and formant frequencies, whereas Saterland Frisian and Low German vowels show small differences. These findings suggest that vowels of different languages are likely to share the same phonological space when the speech communities largely overlap, as is the case with Saterland Frisian and Low German, but may resist convergence if at least one language is shared with a larger, monolingual speech community, as is the case with High German.

  7. Directory of German wind energy 1998; 3. rev. ed.; Adressbuch der Windenergie 1998

    Energy Technology Data Exchange (ETDEWEB)

    Strunk-Stueckemann, C. [ed.

    1998-06-01

    The 3rd edition of the DEWI German Directory of Wind Energy comprises information on the following topics: (a) Manufacturers and suppliers of wind energy converters and components; measuring equipment; (b) Public and commercial research organisations; (c) Engineering offices and consultants; (d) Banks and insurance companies; (e) Investment and operators companies; (f) Electric supply utilities; (g) Services; (h) Public relations and education; (i) Subject index in German and English. (AKF) [Deutsch] Die dritte Auflage des DEWI-Adressbuches 1998 beinhaltet Angaben zu den folgenden Themen: (a) Hersteller/Lieferer von: Windkraftanlagen und Komponenten; Messtechnik; (b) Oeffentliche und gewerbliche Forschung; (c) Enginieurbueros/Beratung; (d) Banken und Versicherungen; (e) Beteiligungs- und Betreibergesellschaften; (f) Energieversorgungsunternehmen; (g) Dienstleistungen; (h) Oeffentlichkeitsarbeit und Aus- und Weiterbildung; (i) Register (deutsch-englich). (AKF)

  8. Excessive Profits of German Defense Contractors

    Science.gov (United States)

    2014-09-01

    its business unit Thyssen Krupp Marine Systems, is a German defense contractor. (2) Tognom AG Tognum AG owned the MTU Friedrichshafen GmbH before... Friedrichshafen provided engines for many ships of the German Navy and for German battle tanks, such as the Leopard I and Leopard II. MTU refers to the

  9. Multi-utility enterprises: an outlook on the prospects in the liberalising markets. Terms and definitions, competition, management strategies, trends; Multi-Utility: Wohin entwickelt sich der Markt? Begriffe, Standort, Strategie, Tendenzen

    Energy Technology Data Exchange (ETDEWEB)

    Mattis, M. [multi-utility consulting, Stuttgart (Germany)

    2003-03-01

    In the light of a spreading confusion of concepts in the context of emerging new business structures and new supply and disposal services in the utility sector, the article explains the current concepts and terms like utility, multi-utility, single-utility, and cross selling, and the respective corporate management and trading characteristics. (orig./CB) [German] In der Ver- und Entsorgung herrscht heillose Begriffsverwirrung. Viele verstehen unter Begriffen wie Utility, Multi-Utility, Single-Utility und cross selling etwas anderes. Versuch einer Begriffsbestimmung und daran anschliessende strategische Ueberlegungen. (orig./CB)

  10. The German Environmentalist Party - The Greens

    International Nuclear Information System (INIS)

    Mettke, J.R.

    1982-01-01

    The Greens are winning supporters throughout the FRG, quite a few of them are already members of the parliament of various lands. Will they cooperate with the established political parties in Bonn. Will they take over from the Free Democrats the role of holding the balance of power. In this book, Spiegel editors present their analyses of the changing concepts of the new political movement. The most outstanding members of the Environmentalist Party - the so-called Greens - define their position and state their opinions on the problems of coalition forming, and prominent members of the parties of the German Bundestag answer these statements. (orig.) [de

  11. Sacramento Municipal Utility District Geothermal Power Plant, SMUDGEO No. 1. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1981-02-01

    The proposed construction of 72-MW geothermal power plant is discussed. The following aspects are covered: the project as proposed by the utility; the environmental setting; the adverse consequences of the project, any significant environmental effects which cannot be avoided, and any mitigation measures to minimize significant effects; the potential feasible alternatives to the proposed project; the significant unavoidable, irreversible, and long-term environmental impacts; and the Growth Inducing Impacts. (MHR)

  12. Enriching the Curriculum with Pennsylvania German

    Science.gov (United States)

    Meindl, Joerg

    2016-01-01

    The German classroom should prepare students for the linguistic diversity of the target culture, including regional varieties and German spoken outside of the D-A-CH region. Because textbooks do not often include materials on regional varieties, this article presents a model to incorporate Pennsylvania German (PG) into the curriculum. The model…

  13. Steam generators. English-German, German-English. Dampferzeuger. Englisch-Deutsch, Deutsch-Englisch

    Energy Technology Data Exchange (ETDEWEB)

    Junge, H D

    1986-01-01

    This pocket dictionary contains the most important technical terms relating to steam generators both in English-German and German-English. Part of the terms go with additional definitions or explanations. Furthermore numerous examples are presented to explain the underlying rules for the formation of word combinations. In addition, entries include a number of general terms, as experience shows that suitable equivalents for use in technical texts are often needed precisely by the specialist. (HAG).

  14. Multiple utilization of energy in buildings. Utilization of waste heat at the Blood Transfusion Service; Energie im Gebaeude mehrfach nutzen. Abwaermenutzung beim Blutspendedienst Nord

    Energy Technology Data Exchange (ETDEWEB)

    Gaigalat, Jens

    2012-11-01

    For the Blood Transfusion Service North the German Red Cross (Berlin, Federal Republic of Germany) utilizes the waste heat from production facilities and laboratories for heating offices. By doing this, the VRV technology for the realization of this solution was used.

  15. Radial power distribution shaping within a PWR fuel assembly utilizing asymmetrically loaded gadolinia-bearing fuel pins

    International Nuclear Information System (INIS)

    Stone, I.Z.

    1992-01-01

    As in-core fuel management designs evolve to meet the demands of increasing energy output, more innovative methods are developed to maintain power peaking within acceptable thermal margin limits. In-core fuel management staff must utilize various loading pattern strategies such as cross-core movement of fuel assemblies, multibatch enrichment schemes, and burnable absorbers as the primary means of controlling the radial power distribution. The utilization of fresh asymmetrically loaded gadolinia-bearing assemblies as a fuel management tool provides an additional means of controlling the radial power distribution. At Siemens Nuclear Power Corporation (SNP), fresh fuel assemblies fabricated with asymmetrically loaded gadolinia-bearing fuel rods have been used successfully for several cycles of reactor operation. Asymmetric assemblies are neutronically modeled using the same tools and models that SNP uses to model symmetrically loaded gadolinia-bearing fuel assemblies. The CASMO-2E code is used to produce the homogenized macroscopic assembly cross sections for the nodal core simulator. Optimum fuel pin locations within the asymmetrical assembly are determined using the pin-by-pin PDQ7 assembly core model for each new assembly design. The optimum pin location is determined by the rod loading that minimizes the peak-to-average pin power

  16. NRC review of Electric Power Research Institute's Advanced Light Water Reactor Utility Requirements Document - Evolutionary plant designs, Chapter 1, Project No. 669

    International Nuclear Information System (INIS)

    1992-08-01

    The staff of the US Nuclear Regulatory Commission has prepared Volume 2 (Parts 1 and 2) of a safety evaluation report (SER), ''NRC Review of Electric Power Research Institute's Advanced Light Water Reactor Utility Requirements Document -- Evolutionary Plant Designs,'' to document the results of its review of the Electric Power Research Institute's ''Advanced Light Water Reactor Utility Requirements Document.'' This SER gives the results of the staff's review of Volume II of the Requirements Document for evolutionary plant designs, which consists of 13 chapters and contains utility design requirements for an evolutionary nuclear power plant (approximately 1300 megawatts-electric)

  17. The interpretation of the Battle of Leipzig (October 16–19, 1813 in the German patriotic sermon

    Directory of Open Access Journals (Sweden)

    Sterkhov Dmitry Vladimirovich

    2013-11-01

    Full Text Available The article touches upon the impact of the religion on the national consciousness of European nations in the 19th century. As an example of this impact can serve the sermons of the German protestant clergy dedicated to the victory of the German and Allied troops over Napoleon armies in the Battle of Leipzig on 16–19 October, 1813. On the battlefield of Leipzig there emerged a very powerful national myth, partly created by means of the patriotic preaching of German pastors. This myth of Leipzig, propagandized by the protestant clergy, consisted of several components; one of them was the popular idea of “God’s Judgment” which was imposed by God on Napoleon and the French nation. The salvation of Germany was thus explained by God’s direct intervention in the Liberation Wars against France. The pastors create a dark and unattractive image of Napoleon who is exposed as tyrant, theomachist and even Antichrist. Not less negative is the image of the French who are described in the sermons as unreligious and immoral. Their direct opposites are the Germans whom the protestant preachers endow with such qualities as piety and morality. In the eyes of the pastors the Germans constitute a single nation united by common features, such as the German language, the German traditions and the German religiousness. As considerable national symbols in the sermons appear the German national heroes such as Martin Luther, the Swedish King Gustav Adolph and the most notable hero Hermann, the leader of one of the ancient German tribes. Consequently the French are compared with ancient Romans who overindulged in sins and immorality and were defeated by the brave Germans with the help of God. As a result the German protestant clergy contribute to the creating of the myth of Leipzig which became a considerable symbol of the German national history.

  18. Multi utility - a successful conception for energy supply companies?; Multi-Utility - Erfolgskonzept fuer Energieversorger? Zusammenwachsen der Maerkte

    Energy Technology Data Exchange (ETDEWEB)

    Schmidt, C. [LBD-Beratungsgesellschaft mbH, Berlin (Germany)

    2003-06-02

    Multi-utility is seen as the most promising marketing strategy for energy companies. In the future, experts say, only the combined supply of electricity, natural gas, water, waste management and services will allow companies to grow. But are today's multi-utility-products answering the needs of the customers? The author goes further into this question and finds the answer: Multi-utility needs to be further developed. Only products from growth and competition markets can generate additional margins. (orig.) [German] Multi-Utility gilt als die Marketingstrategie fuer Energieversorger. Nur wer zukuenftig Strom, Gas, Wasser, Entsorgung und Service aus einer Hand anbietet, heisst es in der Branche, kann im Markt wachsen. Doch inwieweit entspricht das heutige Multi-Utility-Angebot wirklich dem Kundenbeduerfnis? Die Verfasserin geht dieser Frage nach und kommt zu dem Schluss: Die Multi-Utility-Palette muss weiterentwickelt werden. Nur mit Produkten aus Wachstums- und Wettbewerbsmaerkten kann zusaetzliche Marge generiert werden. (orig.)

  19. Silent Film in the German Classroom.

    Science.gov (United States)

    Caldwell, David

    In addition to using films in the German classroom to introduce students to German culture and history, it is important to show and study the film as film. This procedure emphasizes the importance of the film as a part of creative arts in Germany and demands student participation in observation and discussion. Many German silent films are…

  20. Factors affecting the potential of direct load control for non-generating utilities. Final report. [Distribution and wholesale power supply interaction

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-04-01

    Several alternatives are available for achieving load management, including direct or voluntary control of customer loads, customer or utility energy storage systems for diurnal load shifting, and expanded interconnection and operation of electric power systems. All of these alternatives are available to the fully integrated (generating, transmitting and distributing) electric utility and the analysis of their effects encompasses the power supply and delivery system. However, the costs and benefits of the alternatives to the fully integrated electric utility are perhaps not so obvious. Therefore, by considering a non-generating utility, this analysis focuses upon the distribution system and wholesale power supply interaction as a step toward an analysis including the power supply and delivery system. This report develops an analysis procedure and discusses some of the relevant factors to be consdered in the application of direct load control for a non-generating utility system. The analysis concentrates on the distribution system only to determine the effect of rates and payback as a result of direct load control. Thus, the study is responsive to the specific needs of the non-generating utility. This analysis of direct load control encompasses the determination of those loads amenable to control, the selection of a suitable one-way communications system to rend control and the estimation of expected benefits and costs. The complementary functions to the application of direct load control such as automatic meter reading via the addition of a bi-directional communications system and voltage control are not included in the analysis but are detailed for future consideration.