  1. Environmental Assessment Lakeview Geothermal Project

    Energy Technology Data Exchange (ETDEWEB)

    Treis, Tania [Southern Oregon Economic Development Department, Medford, OR (United States)

    2012-04-30

    The Town of Lakeview is proposing to construct and operate a geothermal direct use district heating system in Lakeview, Oregon. The proposed project would be in Lake County, Oregon, within the Lakeview Known Geothermal Resources Area (KGRA). The proposed project includes the following elements: Drilling, testing, and completion of a new production well and geothermal water injection well; construction and operation of a geothermal production fluid pipeline from the well pad to various Town buildings (i.e., local schools, hospital, and Lake County Industrial Park) and back to a geothermal water injection well. This EA describes the proposed project, the alternatives considered, and presents the environmental analysis pursuant to the National Environmental Policy Act. The project would not result in adverse effects to the environment with the implementation of environmental protection measures.

  2. Environmental Report Utah State Prison Geothermal Project

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-03-01

    This environmental report assesses the potential impact of developing a geothermal resource for space heating at the Utah State Prison. Wells will be drilled on prison property for production and for injection to minimize reservoir depletion and provide for convenient disposal of cooled fluid. The most significant environmental concerns are the proper handling of drilling muds during well drilling and the disposal of produced water during well testing. These problems will be handled by following currently accepted practices to reduce the potential risks.

  3. Geothermal environmental projects publication list with abstracts 1975-1978

    Energy Technology Data Exchange (ETDEWEB)

    Ricker, Y.E.; Anspaugh, L.R.

    1979-05-15

    This report contains 119 abstracts of publication resulting from or closely related to geothermal environmental projects conducted by the Environmental Sciences Division at Lawrence Livermore Laboratory. Publications are listed chronologically from 1975 through 1978. The main entries are numbered sequentially, and include the full citation, an abstract, and selected keywords. This section is followed by an author index, and a keyword index.

  4. Environmental assessment for geothermal loan guarantee: South Brawley geothermal exploration project

    Energy Technology Data Exchange (ETDEWEB)

    1979-11-01

    The foregoing analysis indicates that the proposed geothermal field experiment could result in several adverse environmental effects. Such effects would lie primarily in the areas of air quality, noise, aesthetics, land use, and water consumption. However, for the most part, mitigating measures have been, or easily could be, included in project plans to reduce these adverse effects to insignificant levels. Those aspects of the project which are not completely amenable to mitigation by any reasonable means include air quality, noise, aesthetics, land use and water use.

  5. Environmental assessmental, geothermal energy, Heber geothermal binary-cycle demonstration project: Imperial County, California

    Energy Technology Data Exchange (ETDEWEB)

    1980-10-01

    The proposed design, construction, and operation of a commercial-scale (45 MWe net) binary-cycle geothermal demonstration power plant are described using the liquid-dominated geothermal resource at Heber, Imperial County, California. The following are included in the environmental assessment: a description of the affected environment, potential environmental consequences of the proposed action, mitigation measures and monitoring plans, possible future developmental activities at the Heber anomaly, and regulations and permit requirements. (MHR)

  6. Implementation Plan for the Hawaii Geothermal Project Environmental Impact Statement (DOE Review Draft:)

    Energy Technology Data Exchange (ETDEWEB)

    None

    1992-09-18

    The US Department of Energy (DOE) is preparing an Environmental Impact Statement (EIS) that identifies and evaluates the environmental impacts associated with the proposed Hawaii Geothermal Project (HGP), as defined by the State of Hawaii in its 1990 proposal to Congress (DBED 1990). The location of the proposed project is shown in Figure 1.1. The EIS is being prepared pursuant to the requirements of the National Environmental Policy Act of 1969 (NEPA), as implemented by the President's Council on Environmental Quality (CEQ) regulations (40 CFR Parts 1500-1508) and the DOE NEPA Implementing Procedures (10 CFR 1021), effective May 26, 1992. The State's proposal for the four-phase HGP consists of (1) exploration and testing of the geothermal resource beneath the slopes of the active Kilauea volcano on the Island of Hawaii (Big Island), (2) demonstration of deep-water power cable technology in the Alenuihaha Channel between the Big Island and Mau, (3) verification and characterization of the geothermal resource on the Big Island, and (4) construction and operation of commercial geothermal power production facilities on the Big Island, with overland and submarine transmission of electricity from the Big Island to Oahu and possibly other islands. DOE prepared appropriate NEPA documentation for separate federal actions related to Phase 1 and 2 research projects, which have been completed. This EIS will consider Phases 3 and 4, as well as reasonable alternatives to the HGP. Such alternatives include biomass coal, solar photovoltaic, wind energy, and construction and operation of commercial geothermal power production facilities on the Island of Hawaii (for exclusive use on the Big Island). In addition, the EIs will consider the reasonable alternatives among submarine cable technologies, geothermal extraction, production, and power generating technologies; pollution control technologies; overland and submarine power transmission routes; sites reasonably suited to

  7. Telephone Flat Geothermal Development Project Environmental Impact Statement Environmental Impact Report. Final: Comments and Responses to Comments

    Energy Technology Data Exchange (ETDEWEB)

    None

    1999-02-01

    This document is the Comments and Responses to Comments volume of the Final Environmental Impact Statement and Environmental Impact Report prepared for the proposed Telephone Flat Geothermal Development Project (Final EIS/EIR). This volume of the Final EIS/EIR provides copies of the written comments received on the Draft EIS/EIR and the leady agency responses to those comments in conformance with the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA).

  8. Effective use of environmental impact assessments (EIAs) for geothermal development projects

    International Nuclear Information System (INIS)

    Goff, S.J.

    2000-01-01

    Both the developed and developing nations of the world would like to move toward a position of sustainable development while paying attention to the restoration of natural resources, improving the environment, and improving the quality of life. The impacts of geothermal development projects are generally positive. It is important, however, that the environmental issues associated with development be addressed in a systematic fashion. Drafted early in the project planning stage, a well-prepared Environmental Impact Assessment (EIA) can significantly add to the quality of the overall project. An EIA customarily ends with the decision to proceed with the project. The environmental analysis process could be more effective if regular monitoring, detailed in the EIA, continues during project implementation. Geothermal development EIAs should be analytic rather than encyclopedic, emphasizing the impacts most closely associated with energy sector development. Air quality, water resources and quality, geologic factors, and socioeconomic issues will invariably be the most important factors. The purpose of an EIA should not be to generate paperwork, but to enable superb response. The EIA should be intended to help public officials make decisions that are based on an understanding of environmental consequences and take proper actions. The EIA process has been defined in different ways throughout the world. In fact, it appears that no two countries have defined it in exactly the same way. Going hand in hand with the different approaches to the process is the wide variety of formats available. It is recommended that the world geothermal community work towards the adoption of a standard. The Latin American Energy Organization (OLADE) and the Inter-American Development Bank (IDB)(OLADE, 1993) prepared a guide that presents a comprehensive discussion of the environmental impacts and suggested mitigation alternatives associated with geothermal development projects. The OLADE guide

  9. Environmental Assessment and Finding of No Significant Impact: Kalina Geothermal Demonstration Project Steamboat Springs, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1999-02-22

    The Department of Energy (DOE) has prepared an Environmental Assessment (EA) to provide the DOE and other public agency decision makers with the environmental documentation required to take informed discretionary action on the proposed Kalina Geothermal Demonstration project. The EA assesses the potential environmental impacts and cumulative impacts, possible ways to minimize effects associated with partial funding of the proposed project, and discusses alternatives to DOE actions. The DOE will use this EA as a basis for their decision to provide financial assistance to Exergy, Inc. (Exergy), the project applicant. Based on the analysis in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human or physical environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement is not required and DOE is issuing this Finding of No Significant Impact (FONSI).

  10. Hawaii geothermal project

    Science.gov (United States)

    Kamins, R. M.

    1974-01-01

    Hawaii's Geothermal Project is investigating the occurrence of geothermal resources in the archipelago, initially on the Island of Hawaii. The state's interest in geothermal development is keen, since it is almost totally dependent on imported oil for energy. Geothermal development in Hawaii may require greater participation by the public sector than has been true in California. The initial exploration has been financed by the national, state, and county governments. Maximization of net benefits may call for multiple use of geothermal resources; the extraction of by-products and the application of treated effluents to agricultural and aquacultural uses.

  11. Telephone Flat Geothermal Development Project Environmental Impact Statement Environmental Impact Report. Final

    Energy Technology Data Exchange (ETDEWEB)

    None

    1999-02-01

    This Final Environmental Impact Statement and Environmental Impact Report (Final EIS/EIR) has been prepared to meet the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA). The Proposed Action includes the construction, operation, and decommissioning of a 48 megawatt (gross) geothermal power plant with ancillary facilities (10-12 production well pads and 3-5 injection well pads, production and injection pipelines), access roads, and a 230-kilovolt (kV) transmission line in the Modoc National Forest in Siskiyou County, California. Alternative locations for the power plant site within a reasonable distance of the middle of the wellfield were determined to be technically feasible. Three power plant site alternatives are evaluated in the Final EIS/EIR.

  12. Geothermal environmental impact

    International Nuclear Information System (INIS)

    Armannsson, H.; Kristmannsdottir, H.

    1992-01-01

    Geothermal utilization can cause surface disturbances, physical effects due to fluid withdrawal noise, thermal effects and emission of chemicals as well as affect the communities concerned socially and economically. The environmental impact can be minimized by multiple use of the energy source and the reinjection of spent fluids. The emission of greenhouse gases to the atmosphere can be substantially reduced by substituting geothermal energy for fossil fuels as an industrial energy source wherever possible

  13. Bibliography of documents and related materials collected for the Hawaii Geothermal Project Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    Glenn, F.M.; Boston, C.R.; Burns, J.C.; Hagan, C.W. Jr.; Saulsbury, J.W.; Wolfe, A.K.

    1995-03-01

    This report has been prepared to make available and archive information developed during preparation of the Environmental Impact Statement for Phases 3 and 4 of the Hawaii Geothermal Project as defined by the state of Hawaii in its April 1989 proposal to Congress. On May 17, 1994, the USDOE published a notice in the Federal Register withdrawing its Notice of Intent of February 14, 1992, to prepare the HGP EIS. Since the state of Hawaii is no longer pursuing or planning to pursue the HGP, DOE considers the project to be terminated. This report provides a bibliography of documents, published papers, and other reference materials that were obtained or used. The report provides citations for approximately 642 documents, published papers, and other reference materials that were gathered to describe the potentially affected environment on the islands of Hawaii, Maui, and Oahu. The listing also does not include all the reference materials developed by support subcontractors and cooperating agencies who participated in the project. This listing does not include correspondence or other types of personal communications. The documents listed in this report can be obtained from original sources or libraries.

  14. Environmental Assessment of the Hawaii Geothermal Project Well Flow Test Program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1976-11-01

    The Hawaii Geothermal Project, a coordinated research effort of the University of Hawaii, funded by the County and State of Hawaii, and ERDA, was initiated in 1973 in an effort to identify, generate, and use geothermal energy on the Big Island of Hawaii. A number of stages are involved in developing geothermal power resources: exploration, test drilling, production testing, field development, power plant and powerline construction, and full-scale production. Phase I of the Project, which began in the summer of 1973, involved conducting exploratory surveys, developing analytical models for interpretation of geophysical results, conducting studies on energy recovery from hot brine, and examining the legal and economic implications of developing geothermal resources in the state. Phase II of the Project, initiated in the summer of 1975, centers on drilling an exploratory research well on the Island of Hawaii, but also continues operational support for the geophysical, engineering, and socioeconomic activities delineated above. The project to date is between the test drilling and production testing phase. The purpose of this assessment is to describe the activities and potential impacts associated with extensive well flow testing to be completed during Phase II.

  15. Niland development project geothermal loan guaranty: 49-MW (net) power plant and geothermal well field development, Imperial County, California: Environmental assessment

    Energy Technology Data Exchange (ETDEWEB)

    1984-10-01

    The proposed federal action addressed by this environmental assessment is the authorization of disbursements under a loan guaranteed by the US Department of Energy for the Niland Geothermal Energy Program. The disbursements will partially finance the development of a geothermal well field in the Imperial Valley of California to supply a 25-MW(e) (net) power plant. Phase I of the project is the production of 25 MW(e) (net) of power; the full rate of 49 MW (net) would be achieved during Phase II. The project is located on approximately 1600 acres (648 ha) near the city of Niland in Imperial County, California. Well field development includes the initial drilling of 8 production wells for Phase I, 8 production wells for Phase II, and the possible need for as many as 16 replacement wells over the anticipated 30-year life of the facility. Activities associated with the power plant in addition to operation are excavation and construction of the facility and associated systems (such as cooling towers). Significant environmental impacts, as defined in Council on Environmental Quality regulation 40 CFR Part 1508.27, are not expected to occur as a result of this project. Minor impacts could include the following: local degradation of ambient air quality due to particulate and/or hydrogen sulfide emissions, temporarily increased ambient noise levels due to drilling and construction activities, and increased traffic. Impacts could be significant in the event of a major spill of geothermal fluid, which could contaminate groundwater and surface waters and alter or eliminate nearby habitat. Careful land use planning and engineering design, implementation of mitigation measures for pollution control, and design and implementation of an environmental monitoring program that can provide an early indication of potential problems should ensure that impacts, except for certain accidents, will be minimized.

  16. The YNP Metagenome Project: Environmental Parameters Responsible for Microbial Distribution in the Yellowstone Geothermal Ecosystem

    Directory of Open Access Journals (Sweden)

    William P. Inskeep

    2013-05-01

    Full Text Available The Yellowstone geothermal complex contains over 10,000 diverse geothermal features that host numerous phylogenetically deeply-rooted and poorly understood archaea, bacteria and viruses. Microbial communities in high-temperature environments are generally less diverse than soil, marine, sediment or lake habitats and therefore offer a tremendous opportunity for studying the structure and function of different model microbial communities using environmental metagenomics. One of the broader goals of this study was to establish linkages among microbial distribution, metabolic potential and environmental variables. Twenty geochemically distinct geothermal ecosystems representing a broad spectrum of Yellowstone hot-spring environments were used for metagenomic and geochemical analysis and included approximately equal numbers of: (1 phototrophic mats, (2 ‘filamentous streamer’ communities, and (3 archaeal-dominated sediments. The metagenomes were analyzed using a suite of complementary and integrative bioinformatic tools, including phylogenetic and functional analysis of both individual sequence reads and assemblies of predominant phylotypes. This volume identifies major environmental determinants of a large number of thermophilic microbial lineages, many of which have not been fully described in the literature nor previously cultivated to enable functional and genomic analyses. Moreover, protein family abundance comparisons and in-depth analyses of specific genes and metabolic pathways relevant to these hot-spring environments reveal hallmark signatures of metabolic capabilities that parallel the distribution of phylotypes across specific types of geochemical environments.

  17. Environmental assessment: Raft River geothermal project pilot plant, Cassia County, Idaho

    Energy Technology Data Exchange (ETDEWEB)

    1979-09-01

    The action assessed here is the construction and operation of a 5- to 6-MW(e) (gross) geothermal pilot plant in the Raft River Valley of southern Idaho. This project was originally planned as a thermal test loop using a turbine simulator valve. The test loop facility (without the simulator valve) is now under construction. The current environmental assessment addresses the complete system including the addition of a turbine-generator and its associated switching gear in place of the simulator valve. The addition of the turbine-generator will result in a net production of 2.5 to 3.5 MW(e) with a commensurate reduction in waste heat to the cooling tower and will require the upgrading of existing transmission lines for offsite delivery of generated power. Construction of the facility will require disturbance of approximately 20 ha (50 acres) for the facility itself and approximately 22.5 ha (57 acres) for construction of drilling pads and ponds, pipelines, and roads. Existing transmission lines will be upgraded for the utility system interface. Interference with alternate land uses will be minimal. Loss of wildlife habitat will be acceptable, and US Fish and Wildlife Service recommendations for protection of raptor nesting sites, riparian vegetation, and other important habitats will be observed. During construction, noise levels may reach 100 dBA at 15 m (50 ft) from well sites, but wildlife and local residents should not be significantly affected if extended construction is not carried out within 0.5 km (0.3 miles) of residences or sensitive wildlife habitat. Water use during construction will not be large and impacts on competing uses are unlikely.

  18. Geothermal Money Book [Geothermal Outreach and Project Financing

    Energy Technology Data Exchange (ETDEWEB)

    Elizabeth Battocletti

    2004-02-01

    Small business lending is big business and growing. Loans under $1 million totaled $460 billion in June 2001, up $23 billion from 2000. The number of loans under $100,000 continued to grow at a rapid rate, growing by 10.1%. The dollar value of loans under $100,000 increased 4.4%; those of $100,000-$250,000 by 4.1%; and those between $250,000 and $1 million by 6.4%. But getting a loan can be difficult if a business owner does not know how to find small business-friendly lenders, how to best approach them, and the specific criteria they use to evaluate a loan application. This is where the Geothermal Money Book comes in. Once a business and financing plan and financial proposal are written, the Geothermal Money Book takes the next step, helping small geothermal businesses locate and obtain financing. The Geothermal Money Book will: Explain the specific criteria potential financing sources use to evaluate a proposal for debt financing; Describe the Small Business Administration's (SBA) programs to promote lending to small businesses; List specific small-business friendly lenders for small geothermal businesses, including those which participate in SBA programs; Identify federal and state incentives which are relevant to direct use and small-scale (< 1 megawatt) power generation geothermal projects; and Provide an extensive state directory of financing sources and state financial incentives for the 19 states involved in the GeoPowering the West (GPW). GPW is a U.S. Department of Energy-sponsored activity to dramatically increase the use of geothermal energy in the western United States by promoting environmentally compatible heat and power, along with industrial growth and economic development. The Geothermal Money Book will not: Substitute for financial advice; Overcome the high exploration, development, and financing costs associated with smaller geothermal projects; Remedy the lack of financing for the exploration stage of a geothermal project; or Solve

  19. Environmental monitoring for the hot dry rock geothermal energy development project. Annual report, July 1975--June 1976

    Energy Technology Data Exchange (ETDEWEB)

    Pettitt, R.A. (comp.)

    1976-09-01

    The objectives of this environmental monitoring report are to provide a brief conceptual and historical summary of the Hot Dry Rock Geothermal Project, a brief overview of the environmental monitoring responsibilities and activities of the Los Alamos Scientific Laboratory, and descriptions of the studies, problems, and results obtained from the various monitoring programs. Included are descriptions of the work that has been done in three major monitoring areas: (1) water quality, both surface and subsurface; (2) seismicity, with a discussion of the monitoring strategy of regional, local, and close-in detection networks; and (3) climatology. The purpose of these programs is to record baseline data, define potential effects from the project activities, and determine and record any impacts that may occur.

  20. Retrospective examination of geothermal environmental assessments

    Energy Technology Data Exchange (ETDEWEB)

    Webb, J.W.; Eddlemon, G.K.; Reed, A.W.

    1984-03-01

    Since 1976, the Department of Energy (DOE) has supported a variety of programs and projects dealing with the exploration, development, and utilization of geothermal energy. This report presents an overview of the environmental impacts associated with these efforts. Impacts that were predicted in the environmental analyses prepared for the programs and projects are reviewed and summarized, along with measures that were recommended to mitigate these impacts. Also, for those projects that have gone forward, actual impacts and implemented mitigation measures are reported, based on telephone interviews with DOE and project personnel. An accident involving spills of geothermal fluids was the major environmental concern associated with geothermal development. Other important considerations included noise from drilling and production, emissions of H/sub 2/S and cooling tower drift, disposal of solid waste (e.g., from H/sub 2/S control), and the cumulative effects of geothermal development on land use and ecosystems. Mitigation measures were frequently recommended and implemented in conjunction with noise reduction; drift elimination; reduction of fugitive dust, erosion, and sedimentation; blowout prevention; and retention of wastes and spills. Monitoring to resolve uncertainties was often implemented to detect induced seismicity and subsidence, noise, drift deposition, concentrations of air and water pollutants, and effects on groundwater. The document contains an appendix, based on these findings, which outlines major environmental concerns, mitigation measures, and monitoring requirements associated with geothermal energy. Sources of information on various potential impacts are also listed.

  1. Engineered Geothermal System Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Petty, Susan

    2014-06-19

    In June 2009, AltaRock Energy began field work on a project supported by the U.S. Department of Energy entitled “Use of Multiple Stimulations to Improve Economics of Engineered Geothermal Systems in Shallow High Temperature Intrusives.” The goal of the project was to develop an Engineered Geothermal System (EGS) in the portion of The Geysers geothermal field operated by the Northern California Power Agency (NCPA). The project encountered several problems while deepening Well E-7 which culminated in the suspension of field activities in September 2009. Some of the problems encountered are particular to The Geysers area, while others might be encountered in any geothermal field, and they might be avoided in future operations.

  2. Environmental summary document for the Republic Geothermal, Inc. application for a geothermal loan guaranty project: 64 MW well field and 48 MW (net) geothermal power plant

    Energy Technology Data Exchange (ETDEWEB)

    Layton, D.W.; Powers, D.J.; Leitner, P.; Crow, N.B.; Gudiksen, P.H.; Ricker, Y.E.

    1979-07-01

    A comprehensive review and analysis is provided of the environmental consequences of (1) guaranteeing a load for the completion of the 64 MW well field and the 48 MW (net) power plant or (2) denying a guaranteed load that is needed to finish the project. Mitigation measures are discussed. Alternatives and their impacts are compared and some discussion is included on unavoidable adverse impacts. (MHR)

  3. Boise geothermal injection well: Final environmental assessment

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    The City of Boise, Idaho, an Idaho Municipal Corporation, is proposing to construct a well with which to inject spent geothermal water from its hot water heating system back into the geothermal aquifer. Because of a cooperative agreement between the City and the US Department of Energy to design and construct the proposed well, compliance to the National Environmental Policy Act (NEPA) is required. Therefore, this Environmental Assessment (EA) represents the analysis of the proposed project required under NEPA. The intent of this EA is to: (1) briefly describe historical uses of the Boise Geothermal Aquifer; (2) discuss the underlying reason for the proposed action; (3) describe alternatives considered, including the No Action Alternative and the Preferred Alternative; and (4) present potential environmental impacts of the proposed action and the analysis of those impacts as they apply to the respective alternatives.

  4. Boise geothermal injection well: Final environmental assessment

    International Nuclear Information System (INIS)

    1997-01-01

    The City of Boise, Idaho, an Idaho Municipal Corporation, is proposing to construct a well with which to inject spent geothermal water from its hot water heating system back into the geothermal aquifer. Because of a cooperative agreement between the City and the US Department of Energy to design and construct the proposed well, compliance to the National Environmental Policy Act (NEPA) is required. Therefore, this Environmental Assessment (EA) represents the analysis of the proposed project required under NEPA. The intent of this EA is to: (1) briefly describe historical uses of the Boise Geothermal Aquifer; (2) discuss the underlying reason for the proposed action; (3) describe alternatives considered, including the No Action Alternative and the Preferred Alternative; and (4) present potential environmental impacts of the proposed action and the analysis of those impacts as they apply to the respective alternatives

  5. INEL Geothermal Environmental Program. Final environmental report

    Energy Technology Data Exchange (ETDEWEB)

    Thurow, T.L.; Cahn, L.S.

    1982-09-01

    An overview of environmental monitoring programs and research during development of a moderate temperature geothermal resource in the Raft River Valley is presented. One of the major objectives was to develop programs for environmental assessment and protection that could serve as an example for similar types of development. The monitoring studies were designed to establish baseline conditions (predevelopment) of the physical, biological, and human environment. Potential changes were assessed and adverse environmental impacts minimized. No major environmental impacts resulted from development of the Raft River Geothermal Research Facility. The results of the physical, biological, and human environment monitoring programs are summarized.

  6. Environmental impacts during geothermal development: Some examples from Central America

    International Nuclear Information System (INIS)

    Goff, S.; Goff, F.

    1997-01-01

    The impacts of geothermal development projects are usually positive. However, without appropriate monitoring plans and mitigation actions firmly incorporated into the project planning process, there exists the potential for significant negative environmental impacts. The authors present five examples from Central America of environmental impacts associated with geothermal development activities. These brief case studies describe landslide hazards, waste brine disposal, hydrothermal explosions, and air quality issues. Improved Environmental Impact Assessments are needed to assist the developing nations of the region to judiciously address the environmental consequences associated with geothermal development

  7. Computational methods for planning and evaluating geothermal energy projects

    International Nuclear Information System (INIS)

    Goumas, M.G.; Lygerou, V.A.; Papayannakis, L.E.

    1999-01-01

    In planning, designing and evaluating a geothermal energy project, a number of technical, economic, social and environmental parameters should be considered. The use of computational methods provides a rigorous analysis improving the decision-making process. This article demonstrates the application of decision-making methods developed in operational research for the optimum exploitation of geothermal resources. Two characteristic problems are considered: (1) the economic evaluation of a geothermal energy project under uncertain conditions using a stochastic analysis approach and (2) the evaluation of alternative exploitation schemes for optimum development of a low enthalpy geothermal field using a multicriteria decision-making procedure. (Author)

  8. Colorado State Capitol Geothermal project

    Energy Technology Data Exchange (ETDEWEB)

    Shepherd, Lance [Colorado Department of Personnel and Adminstration, Denver, CO (United States)

    2016-04-29

    Colorado State Capitol Geothermal Project - Final report is redacted due to space constraints. This project was an innovative large-scale ground-source heat pump (GSHP) project at the Colorado State Capitol in Denver, Colorado. The project employed two large wells on the property. One for pulling water from the aquifer, and another for returning the water to the aquifer, after performing the heat exchange. The two wells can work in either direction. Heat extracted/added to the water via a heat exchanger is used to perform space conditioning in the building.

  9. Geothermal Small Business Workbook [Geothermal Outreach and Project Financing

    Energy Technology Data Exchange (ETDEWEB)

    Elizabeth Battocletti

    2003-05-01

    Small businesses are the cornerstone of the American economy. Over 22 million small businesses account for approximately 99% of employers, employ about half of the private sector workforce, and are responsible for about two-thirds of net new jobs. Many small businesses fared better than the Fortune 500 in 2001. Non-farm proprietors income rose 2.4% in 2001 while corporate profits declined 7.2%. Yet not all is rosy for small businesses, particularly new ones. One-third close within two years of opening. From 1989 to 1992, almost half closed within four years; only 39.5% were still open after six years. Why do some new businesses thrive and some fail? What helps a new business succeed? Industry knowledge, business and financial planning, and good management. Small geothermal businesses are no different. Low- and medium-temperature geothermal resources exist throughout the western United States, the majority not yet tapped. A recent survey of ten western states identified more than 9,000 thermal wells and springs, over 900 low- to moderate-temperature geothermal resource areas, and hundreds of direct-use sites. Many opportunities exist for geothermal entrepreneurs to develop many of these sites into thriving small businesses. The ''Geothermal Small Business Workbook'' (''Workbook'') was written to give geothermal entrepreneurs, small businesses, and developers the tools they need to understand geothermal applications--both direct use and small-scale power generation--and to write a business and financing plan. The Workbook will: Provide background, market, and regulatory data for direct use and small-scale (< 1 megawatt) power generation geothermal projects; Refer you to several sources of useful information including owners of existing geothermal businesses, trade associations, and other organizations; Break down the complicated and sometimes tedious process of writing a business plan into five easy steps; Lead you

  10. Environmental overview of geothermal development: northern Nevada

    Energy Technology Data Exchange (ETDEWEB)

    Slemmons, D.B.; Stroh, J.M.; Whitney, R.A. (eds.)

    1980-08-01

    Regional environmental problems and issues associated with geothermal development in northern Nevada are studied to facilitate environmental assessment of potential geothermal resources. The various issues discussed are: environmental geology, seismicity of northern Nevada, hydrology and water quality, air quality, Nevada ecosystems, noise effects, socio-economic impacts, and cultural resources and archeological values. (MHR)

  11. Occidental Geothermal, Inc. , Oxy Geothermal Power Plant No. 1: draft environmental impact report

    Energy Technology Data Exchange (ETDEWEB)

    1981-08-01

    The following aspects of the proposed geothermal power plant are discussed: the project description; the environment in the vicinity of project as it exists before the project begins, from both a local and regional perspective; the adverse consequences of the project, any significant environmental effects which cannot be avoided, and any mitigation measures to minimize significant effects; the potential feasible alternatives to the proposed project; the significant unavoidable, irreversible, and long-term environmental impacts; and the growth inducing impacts. (MHR)

  12. Economic analysis of geothermal projects

    International Nuclear Information System (INIS)

    Allegrini, G.; Cappetti, G.

    1990-01-01

    This paper reports on the high investment costs typical of geothermal energy which necessitate careful verification of the resource before embarking on a development project. Moreover, they require the adoption of all strategies aimed at limiting investment costs and times as much as possible in order to contain the tie-up of capital in the construction activities. For this purpose a series of choices has been made regarding the constructional standardization of plants and the adoption of organizational criteria that allow cost reduction and better management of the various phases of a development project. A computer program has also been developed which makes it possible to examine the bearing the various parameters relating to the reservoir characteristics have on the cost of the kWh and to optimize resource utilization for the various activities of a development project

  13. Honey Lake Geothermal Project, Lassen County, California

    Science.gov (United States)

    1984-11-01

    The drilling, completion, and testing of deep well WEN-2 for a hybrid electric power project which will use the area's moderate temperature geothermal fluids and locally procured wood fuel is reported. The project is located within the Wendel-Amedee Known Geothermal Resource Area.

  14. 1978 annual report, INEL geothermal environmental program

    Energy Technology Data Exchange (ETDEWEB)

    Spencer, S.G.; Sullivan, J.F.; Stanley, N.E.

    1979-04-01

    The objective of the Raft River Geothermal Environmental Program, in its fifth year, is to characterize the beneficial and detrimental impacts resulting from the development of moderate-temperature geothermal resources in the valley. This report summarizes the monitoring and research efforts conducted as part of this program in 1978. The results of these monitoring programs will be used to determine the mitigation efforts required to reduce long-term impacts resulting from geothermal development.

  15. SPP retains interest in geothermal project

    International Nuclear Information System (INIS)

    Anon

    2007-01-01

    Slovensky plynarensky priemysel (SPP) officially indicated that it intended to drop its project of using geothermal energy in the Kosicka kotlina. This spring it published an advert that it was looking for a company that wished to acquire a majority stake in the company, Geoterm Kosice. The company was established to commercially develop this geothermal source. But it seems SPP does not want to drop the project completely. It has kept some important cards, such as control over the land where the boreholes are located Any company that wants to use geothermal energy needs a ruling issued by the Ministry of Environment defining the exploration area. Geothermal sources were found in the villages of Durkov, Svinica, Bidovce and Olsovany. Not so long ago the area was assigned to Geoterm but from May 9 the area can be explored by Slovgeoterm. Both companies have the same majority shareholder - SPP. It controls 96% of Geoterm shares and 50% of Slovgeoterm. So far it has only officially announced its intention to sell the Geoterm shares. But as far as the use of the geothermal resource is concerned since May Slovgeoterm has played a key role.The company focuses on the utilization of geothermal energy. In addition to the project in the Kosice region, it has also participated in a project to heat more than a thousand flats using geothermal water in Galanta and a project to heat greenhouses in Podhajske. There are also other geothermal projects running in Presov and Michalovce. Icelandic company, Enex, with the same specialisation controls 28% of the company and a further 20% is owned by the investment group, NEFCO based in Helsinki. Two percent of the company is owned by its general director and the general proxy of Geoterm, Otto Halas. And so without the agreement of this company no-one can start any activities related to the utilization of geothermal energy. (authors)

  16. INEL Geothermal Environmental Program. 1979 annual report

    Energy Technology Data Exchange (ETDEWEB)

    Thurow, T.L.; Sullivan, J.F.

    1980-04-01

    The Raft River Geothermal Environmental Program is designed to assess beneficial and detrimental impacts to the ecosystem resulting from the development of moderate temperature geothermal resources in the valley. The results of this research contribute to developing an understanding of Raft River Valley ecology and provide a basis for making management decisions to reduce potential long-term detrimental impacts on the environment. The environmental monitoring and research efforts conducted during the past six years of geothermal development and planned future research are summarized.

  17. Environmental impact in geothermal fields

    International Nuclear Information System (INIS)

    Birkle, P.; Torres R, V.; Gonzalez P, E.; Guevara G, M.

    1996-01-01

    Generally, water exploitation and deep steam of geothermal fields may be cause of a pollution potential on the surface, specially by the chemical composition of geothermal water which has a high concentration of minerals, salts and heavy metals. The utilization of stable isotopes as deuterium and oxygen 18 as radioactive tracers and water origin indicators allow to know the trajectories and sources of background waters as well as possible moistures between geothermal waters and meteoric waters. Some ions such as chlorides and fluorides present solubilities that allow their register as yet long distances of their source. (Author)

  18. Mt. Apo geothermal project : a learning experience in sustainable development

    International Nuclear Information System (INIS)

    Ote, Leonardo M.; De Jesus, Agnes C.

    1997-01-01

    The Mt. Apo geothermal project, a critical component of the Philippine energy program met stiff opposition from 1988-1991. Seemingly unresolvable legal, environmental and cultural issues between the government developer, the Philippine National Oil Company-Energy Development Corporation (PNOC-EDC) and various affected sectors delayed the project for two years. The paper discusses the efforts undertaken by the developer to resolve these conflicts through a series of initiatives that transformed the project into a legally, environmentally and socially acceptable project. Lastly, the PNOC-EDC experience has evolved a new set of procedures for the environmental evaluation of development project in the Philippines. (author)

  19. Environmental effects of geothermal energy exploitation

    Energy Technology Data Exchange (ETDEWEB)

    Nakamura, H [Japan Metals and Chemicals Co., Ltd., Japan

    1975-01-01

    The environmental effects of geothermal power generation which cause air and water pollution and destruction of natural areas are reviewed. The production of steam and hot water affect existing hot springs sources and can cause ground subsidence. Harmful gas can be released onto the atmosphere from fumarolic gas and hot springs. Hydrothermal geothermal fields occasionally contain harmful substances such as arsenic in the hot water. Serious environmental effects can result from geothermal exploitation activities such as the felling of trees for road construction, well drilling, and plant construction. Once geothermal power generation has begun, the release of H/sub 2/S into the atmosphere and the reinjection of hot water are conducted continuously and sufficient countermeasures can be taken. One problem is the effects of plant construction and operation on natural parks. It is important to reach a compromise between development and protection of natural senic areas. Two figures, two tables, and 13 references are provided.

  20. Greece, Milos Island Geothermal Project

    International Nuclear Information System (INIS)

    Delliou, E.E.

    1990-01-01

    On Milos island (Aegean Sea) a high enthalpy, water dominated geothermal field of high salinity exists. At 1985, a 2MW geothermoelectric pilot plant was installed on the island. This plant has been provided by Mitsubishi Heavy Industries of Japan under a contract with Public Power Corporation of Greece. Due to high salinity of the geothermal fluid, unforeseen problems (scaling mainly) arisen in both steam and brine cycles. As a consequence, the operation (trial mainly) of the power plant have been interrupted several times for long periods, in order to identify the arisen, each time, problems and find the most appropriate technical solution. The above fact, as well as, some unfortunate coincidences described in this paper, led Milos people to react against geothermal development in their island. The sequence of the events, technical and non-technical, their approach and the relevant conclusions are reported in this presentation

  1. 17th Symposium of NEDO projects. Geothermal subcommittee; Chinetsu bunkakai. Dai 17 kai jigyo hokokukai

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    Described herein are the reports presented to the geothermal subcommittee. The NEDO's Geothermal Research Department is developing the technologies for accurately predicting the reservoir changes in the future by the geothermal development promotion investigations for distributed conditions of geothermal resources and related environmental impacts, and also by clarifying the hydrogic characteristics of the fracture systems which form the reservoirs. The department is also implementing the projects for investigating/ researching possibilities of resources distribution conditions and utilization for eventual commercialization of the deep underground geothermal resources, and also investigating utilization of small- to medium-sized geothermal binary power generation systems for effective utilization of unutilized geothermal energy. The geothermal technology development group is developing the technologies for the binary cycle power generation plants which effectively utilize unutilized medium- to high-temperature geothermal water for power generation, and also the technologies for collecting conditions at the bottom of a geothermal well being excavated in real time to improve efficiency and precision of the excavation. The other technologies being developed include those for excavation and production essential for development of power generation systems using high-temperature rocks and deep underground geothermal resources, the former being expected to contribute to expanded utilization of geothermal resources and the latter to increased geothermal power generation capacity. (NEDO)

  2. 17th Symposium of NEDO projects. Geothermal subcommittee; Chinetsu bunkakai. Dai 17 kai jigyo hokokukai

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    Described herein are the reports presented to the geothermal subcommittee. The NEDO's Geothermal Research Department is developing the technologies for accurately predicting the reservoir changes in the future by the geothermal development promotion investigations for distributed conditions of geothermal resources and related environmental impacts, and also by clarifying the hydrogic characteristics of the fracture systems which form the reservoirs. The department is also implementing the projects for investigating/ researching possibilities of resources distribution conditions and utilization for eventual commercialization of the deep underground geothermal resources, and also investigating utilization of small- to medium-sized geothermal binary power generation systems for effective utilization of unutilized geothermal energy. The geothermal technology development group is developing the technologies for the binary cycle power generation plants which effectively utilize unutilized medium- to high-temperature geothermal water for power generation, and also the technologies for collecting conditions at the bottom of a geothermal well being excavated in real time to improve efficiency and precision of the excavation. The other technologies being developed include those for excavation and production essential for development of power generation systems using high-temperature rocks and deep underground geothermal resources, the former being expected to contribute to expanded utilization of geothermal resources and the latter to increased geothermal power generation capacity. (NEDO)

  3. Fairbanks Geothermal Energy Project Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Karl, Bernie [CHSR,LLC Owner

    2013-05-31

    The primary objective for the Fairbanks Geothermal Energy Project is to provide another source of base-load renewable energy in the Fairbanks North Star Borough (FNSB). To accomplish this, Chena Hot Springs Resort (Chena) drilled a re-injection well to 2700 feet and a production well to 2500 feet. The re-injection well allows a greater flow of water to directly replace the water removed from the warmest fractures in the geothermal reservoir. The new production will provide access to warmer temperature water in greater quantities.

  4. Application of environmental isotope tracing technology to geothermal geochemistry

    International Nuclear Information System (INIS)

    Shang Yingnan

    2006-01-01

    This paper reviews the recent application and development of environmental isotope tracing technology to geothermal geochemistry in the following aspects: gas isotopes (He, C) tracing of warm springs; H, O isotope tracing on the origin and cause of geothermal water, environmental isotope dating of geothermal water, and the advantage of excess parameter of deuterium (d) in geothermal research. The author also suggests that isotope method should combine with other geological methods to expand its advantage. (authors)

  5. Geothermal Mill Redevelopment Project in Massachusetts

    Energy Technology Data Exchange (ETDEWEB)

    Vale, A.Q.

    2009-03-17

    Anwelt Heritage Apartments, LLC redeveloped a 120-year old mill complex into a mixed-use development in a lower-income neighborhood in Fitchburg, Massachusetts. Construction included 84 residential apartments rented as affordable housing to persons aged 62 and older. The Department of Energy (“DOE”) award was used as an essential component of financing the project to include the design and installation of a 200 ton geothermal system for space heating and cooling.

  6. Uses of geothermal energy in Jordan for heating greenhouses; project proposal

    International Nuclear Information System (INIS)

    Al-Dabbas, Moh'd A. F.; Masarwah, Rober; Elkarmi, Fawwaz

    1993-08-01

    A proposal for the exploration of geothermal energy in Jordan for heating greenhouses. The report gives some background information on geothermal anomalies in Jordan, and outlines some on-going uses of geothermal energy in various parts of Jordan. The proposal is modelled on the 2664 square meter Filclair Super 9 Multispan greenhouse from France. The overall cost of the project involves three variables, the cost of the borehole, the cost of the greenhouse, and the cost of engineering services. The total cost ranges between three to four million dollars depending on the quantity and quality of information to be collected from the borehole. The advantages of geothermal heating compared with oil heating are emphasized. The project will enable geothermal heating and horticultural production to be monitored throughout the year, will produce data enabling rational and reliable water resources management, and will produce environmentally clean and efficient energy. (A.M.H.). 1 tab. 1 map

  7. Geothermal energy in Italy - its importance, potential and projects

    International Nuclear Information System (INIS)

    Berger, W.

    2005-01-01

    This article discusses the perspectives for the use of geothermal energy in Italy. Starting with an overview of the principles of the use of geothermal energy in general, the article goes on to review Italy's geothermal resources and their relevance to energy supply. Figures are given on the political situation in Italy concerning energy and the rapidly increasing demands made on electricity supply. Political support for renewable energy in Italy is looked at and models for financing projects are examined. Examples of geothermal energy projects are given and the perspectives for further developments in this industry are looked at

  8. Geothermal policy project. Quarterly report, March 1-May 30, 1980

    Energy Technology Data Exchange (ETDEWEB)

    Connor, T.D.

    1980-06-01

    Efforts continued to initiate geothermal and groundwater heat pump study activities in newly selected project states and to carry forward policy development in existing project states. Minnesota and South Carolina have agreed to a groundwater heat pump study, and Maryland and Virginia have agreed to a follow-up geothermal study in 1980. Follow-up contacts were made with several other existing project states and state meetings and workshops were held in eleven project states. Two generic documents were prepared, the Geothermal Guidebook and the Guidebook to Groundwater Heat Pumps, in addition to several state-specific documents.

  9. Geothermal Energy Research and Development Program; Project Summaries

    Energy Technology Data Exchange (ETDEWEB)

    None

    1994-03-01

    This is an internal DOE Geothermal Program document. This document contains summaries of projects related to exploration technology, reservoir technology, drilling technology, conversion technology, materials, biochemical processes, and direct heat applications. [DJE-2005

  10. Geothermal policy project. Quarterly report, June 1-August 31, 1980

    Energy Technology Data Exchange (ETDEWEB)

    Connor, T.D.

    1980-11-01

    Efforts continued to initiate geothermal and water source heat pump study activities in newly selected project states and to carry forward policy development in existing project states. Follow-up contacts were made with several project states, and state meetings and workshops were held in nine project states. Two state-specific documents were prepared during this reporting period, for Nevada and Wyoming.

  11. Final environmental statement for the geothermal leasing program

    Energy Technology Data Exchange (ETDEWEB)

    1973-12-31

    This second of the four volumes of the Geothermal Leasing Program final impact statement contains the individual environmental statements for the leasing of federally owned geothermal resources for development in three specific areas: Clear Lake-Geysers; Mono Lake-Long Valley; and Imperial Valley, all in California. It also includes a summary of the written comments received and departmental responses relative to the Draft Environmental Impact Statement issued in 1971; comments and responses on the Draft Environmental Impact Statement; consultation and coordination in the development of the proposal and in the preparation of the Draft Environmental Statement; and coordination in the review of the Draft Environmental Statement.

  12. Institutional and environmental aspects of geothermal energy development

    Science.gov (United States)

    Citron, O. R.

    1977-01-01

    Until recently, the majority of work in geothermal energy development has been devoted to technical considerations of resource identification and extraction technologies. The increasing interest in exploiting the variety of geothermal resources has prompted an examination of the institutional barriers to their introduction for commercial use. A significant effort was undertaken by the Jet Propulsion Laboratory as a part of a national study to identify existing constraints to geothermal development and possible remedial actions. These aspects included legislative and legal parameters plus environmental, social, and economic considerations.

  13. Executive summaries of reports leading to the construction of the Baca Geothermal Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Sherwood, P.B.; Newman, K.L.; Westermeier, J.F.; Giroux, H.D.; Lowe, G.D.; Nienberg, M.W.

    1980-05-01

    Executive summaries have been written for 61 reports and compilations of data which, in part, have led to the construction of the Baca 50 MW Geothermal Demonstration Project (GDP). The reports and data include environmental research, reservoir and feasibility studies, the project proposal to DOE and the Final Environmental Impact Statement. These executive summaries are intended to give the reader a general overview of each report prior to requesting the report from the GDP Data Manager.

  14. Executive summaries of reports leading to the construction of the Baca Geothermal Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Sherwood, P.B.; Newman, K.L.; Westermeier, J.F.; Giroux, H.D.; Lowe, G.D.; Nienberg, M.W.

    1980-05-01

    Executive summaries have been written for 61 reports and compilations of data which in part, have led to the construction of the Baca 50 MW Geothermal Demonstration Project (GDP). The reports and data include environmental research, reservoir and feasibility studies, the project proposal to DOE and the Final Environmental Impact Statement. These executive summaries are intended to give the reader a general overview of each report prior to requesting the report from the GDP Data Manager.

  15. Environmental impact directory system: preliminary implementation for geothermal energy

    Energy Technology Data Exchange (ETDEWEB)

    Hess, F.D.; Hall, R.T.; Fullenwider, E.D.

    1976-07-01

    An Environmental Impact Directory System (EIDS) was proposed as a method for a computerized search of the widely distributed data files and models pertaining to energy-related environmental effects. To define the scope and content of the system, an example was prepared for the case of geothermal energy. The resulting sub-directory is known as GEIDs (Geothermal Environmental Impact Directory System). In preparing or reviewing an Environmental Impact Statement (EIS), the user may employ GEIDS as an extensive checklist to make sure he has taken into account all predictable impacts at any level of severity.

  16. South Dakota Geothermal Commercialization Project. Final report, July 1979-October 1985

    Energy Technology Data Exchange (ETDEWEB)

    Wegman, S.

    1985-01-01

    This report describes the activities of the South Dakota Energy Office in providing technical assistance, planning, and commercialization projects for geothermal energy. Projects included geothermal prospect identification, area development plans, and active demonstration/commercialization projects. (ACR)

  17. The Pawsey Supercomputer geothermal cooling project

    Science.gov (United States)

    Regenauer-Lieb, K.; Horowitz, F.; Western Australian Geothermal Centre Of Excellence, T.

    2010-12-01

    The Australian Government has funded the Pawsey supercomputer in Perth, Western Australia, providing computational infrastructure intended to support the future operations of the Australian Square Kilometre Array radiotelescope and to boost next-generation computational geosciences in Australia. Supplementary funds have been directed to the development of a geothermal exploration well to research the potential for direct heat use applications at the Pawsey Centre site. Cooling the Pawsey supercomputer may be achieved by geothermal heat exchange rather than by conventional electrical power cooling, thus reducing the carbon footprint of the Pawsey Centre and demonstrating an innovative green technology that is widely applicable in industry and urban centres across the world. The exploration well is scheduled to be completed in 2013, with drilling due to commence in the third quarter of 2011. One year is allocated to finalizing the design of the exploration, monitoring and research well. Success in the geothermal exploration and research program will result in an industrial-scale geothermal cooling facility at the Pawsey Centre, and will provide a world-class student training environment in geothermal energy systems. A similar system is partially funded and in advanced planning to provide base-load air-conditioning for the main campus of the University of Western Australia. Both systems are expected to draw ~80-95 degrees C water from aquifers lying between 2000 and 3000 meters depth from naturally permeable rocks of the Perth sedimentary basin. The geothermal water will be run through absorption chilling devices, which only require heat (as opposed to mechanical work) to power a chilled water stream adequate to meet the cooling requirements. Once the heat has been removed from the geothermal water, licensing issues require the water to be re-injected back into the aquifer system. These systems are intended to demonstrate the feasibility of powering large-scale air

  18. Geothermal project will predetermine future of the Kosice heating plant

    International Nuclear Information System (INIS)

    Hirman, K.

    2003-01-01

    Geoterm, a.s. manager O. Halas describes economic and technical parameters of geothermal energy source by village Durkov near Kosice. It is planned to exploitate geothermal energy source for Kosicka heating plant (TEKO). Three basic variants of technical connecting to geothermal source are developed. Temperature at TEKO entrance should reach 125 degrees, annual heating energy supply will reach 2100 TJ and source output will reach 100 MWt, while admissible deviation at all indicators reaches 10%. The first geothermal energy should by supplied to TEKO in 2007. The investments overlapping 3 billions Slovak crowns are necessary to realize whole project. According to O. Halas a credit from World Bank guaranteed by state is crucial

  19. Coso geothermal environmental overview study ecosystem quality

    Energy Technology Data Exchange (ETDEWEB)

    Leitner, P.

    1981-09-01

    The Coso Known Geothermal Resource Area is located just east of the Sierra Nevada, in the broad transition zone between the Mohave and Great Basin desert ecosystems. The prospect of large-scale geothermal energy development here in the near future has led to concern for the protection of biological resources. Objectives here are the identification of ecosystem issues, evaluation of the existing data base, and recommendation of additional studies needed to resolve key issues. High-priority issues include the need for (1) site-specific data on the occurrence of plant and animal species of special concern, (2) accurate and detailed information on the nature and extent of the geothermal resource, and (3) implementation of a comprehensive plan for ecosystem protection.

  20. Geothermal energy, an environmental and safety mini-overview survey

    Energy Technology Data Exchange (ETDEWEB)

    1976-07-01

    A survey is presented in order to determine the technology status, gaps, and needs for research and development programs in the environment and safety areas of this resource. The information gathered from a survey of geothermal energy development undertaken to provide background for an environment and safety overview program is summarized. A technology assessment for resource development is presented. The three specific environmental problems identified as most potentially limiting to geothermal development; hydrogen sulfide control, brine disposal, and subsidence, are discussed. Current laws, regulations, and standards applying to geothermal systems are summarized. The elements of the environment, health, and safety program considered to be intrinsically related to the development of geothermal energy systems are discussed. Interagency interfaces are touched on briefly. (MHR)

  1. Environmental aspects of the geothermal energy utilisation in Poland

    Science.gov (United States)

    Sowiżdżał, Anna; Tomaszewska, Barbara; Drabik, Anna

    2017-11-01

    Geothermal energy is considered as a strategic and sustainable source of renewable energy that can be effectively managed in several economic sectors. In Poland, despite the abundant potential of such resources, its share in the energy mix of renewable energy sources remains insubstantial. The utilisation of geothermal resources in Poland is related to the hydrogeothermal resources, however, numerous researches related to petrogeothermal energy resources are being performed. The utilisation of each type of energy, including geothermal, has an impact on the natural environment. In case of the effective development of geothermal energy resources, many environmental benefits are pointed out. The primary one is the extraction of clean, green energy that is characterised by the zero-emission rate of pollutants into the atmosphere, what considering the current environmental pollution in many Polish cities remains the extremely important issue. On the other hand, the utilisation of geothermal energy might influence the natural environment negatively. Beginning from the phase of drilling, which strongly interferes with the local landscape or acoustic climate, to the stage of energy exploitation. It should be noted that the efficient and sustainable use of geothermal energy resources is closely linked with the current law regulations at national and European level.

  2. Project Title: Geothermal Play Fairway Analysis of Potential Geothermal Resources in NE California, NW Nevada, and Southern Oregon: A Transition between Extension$-$Hosted and Volcanically$-$Hosted Geothermal Fields

    Energy Technology Data Exchange (ETDEWEB)

    McClain, James S. [Univ. of California, Davis, CA (United States). Dept. of; Dobson, Patrick [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Glassley, William [Univ. of California, Davis, CA (United States). Dept. of Earth and Planetary Sciences; Schiffman, Peter [Univ. of California, Davis, CA (United States). Dept. of Earth and Planetary Sciences; Zierenberg, Robert [Univ. of California, Davis, CA (United States). Dept. of Earth and Planetary Sciences; Zhang, Yingqi [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Conrad, Mark [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Siler, Drew [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Gasperikova, Erika [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Spycher, Nicolas F. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2016-09-30

    Final report for the UCD-LBNL effort to apply Geothermal Play Fairway Analysis to a transition zone between a volcanically-hosted and extensionally-hosted geothermal. The project focusses on the geothermal resources in northeastern California.

  3. Geothermal Reservoir Technology Research Program: Abstracts of selected research projects

    Energy Technology Data Exchange (ETDEWEB)

    Reed, M.J. (ed.)

    1993-03-01

    Research projects are described in the following areas: geothermal exploration, mapping reservoir properties and reservoir monitoring, and well testing, simulation, and predicting reservoir performance. The objectives, technical approach, and project status of each project are presented. The background, research results, and future plans for each project are discussed. The names, addresses, and telephone and telefax numbers are given for the DOE program manager and the principal investigators. (MHR)

  4. Nevada Renewable Energy Training Project: Geothermal Power Plant Operators

    Energy Technology Data Exchange (ETDEWEB)

    Jim, Nichols [Truckee Meadows Community College, Reno, NV (United States)

    2014-04-29

    The purpose of this project was to develop and institute a training program for certified geothermal power plant operators (GPO). An advisory board consisting of subject matter experts from the geothermal energy industry and academia identified the critical skill sets required for this profession. A 34-credit Certificate of Achievement (COA), Geothermal Power Plant Operator, was developed using eight existing courses and developing five new courses. Approval from the Nevada System of Higher Education Board of Regents was obtained. A 2,400 sq. ft. geothermal/fluid mechanics laboratory and a 3,000 sq. ft. outdoor demonstration laboratory were constructed for hands-on training. Students also participated in field trips to geothermal power plants in the region. The majority of students were able to complete the program in 2-3 semesters, depending on their level of math proficiency. Additionally the COA allowed students to continue to an Associate of Applied Science (AAS), Energy Technologies with an emphasis in Geothermal Energy (26 additional credits), if they desired. The COA and AAS are stackable degrees, which provide students with an ongoing career pathway. Articulation agreements with other NSHE institutions provide students with additional opportunities to pursue a Bachelor of Applied Science in Management or Instrumentation. Job placement for COA graduates has been excellent.

  5. The snake geothermal drilling project. Innovative approaches to geothermal exploration

    Energy Technology Data Exchange (ETDEWEB)

    Shervais, John W. [Utah State Univ., Logan, UT (United States); Evans, James P. [Utah State Univ., Logan, UT (United States); Liberty, Lee M. [Boise State Univ., ID (United States); Schmitt, Douglas R. [University of Alberta, Canada; Blackwell, David D. [Southern Methodist Univ., Dallas, TX (United States)

    2014-02-21

    The goal of our project was to test innovative technologies using existing and new data, and to ground-truth these technologies using slim-hole core technology. The slim-hole core allowed us to understand subsurface stratigraphy and alteration in detail, and to correlate lithologies observed in core with surface based geophysical studies. Compiled data included geologic maps, volcanic vent distribution, structural maps, existing well logs and temperature gradient logs, groundwater temperatures, and geophysical surveys (resistivity, magnetics, gravity). New data included high-resolution gravity and magnetic surveys, high-resolution seismic surveys, three slimhole test wells, borehole wireline logs, lithology logs, water chemistry, alteration mineralogy, fracture distribution, and new thermal gradient measurements.

  6. The history and significance of the Hawaii geothermal project

    International Nuclear Information System (INIS)

    Thomas, D.M.

    1990-01-01

    This paper reports that the Hawaii Geothermal Project, since its initiation in 1972, has not only demonstrated that there is a viable geothermal resource present on the Kilauea East Rift Zone, it has also produced a wealth of information about the characteristics of the resource and the operational requirements that must be met to generate electrical power on a long term reliable basis. The HGP-A well demonstrated that a high-temperature hydrothermal system was present on the East Rift Zone; the HGP-A Wellhead Generator Facility showed that electrical power could be generated on a long-term basis from the geothermal reservoir with an availability factor of more than 90%; and research at the facility tested several types of systems for control of hydrogen sulfide and scale deposition. The results of the Hawaii Geothermal Project have helped resolve many uncertainties about the reservoir and will provide guidance to private and regulatory interests as a commercial geothermal development comes on line in Hawaii

  7. BACA Project: geothermal demonstration power plant. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1982-12-01

    The various activities that have been conducted by Union in the Redondo Creek area while attempting to develop the resource for a 50 MW power plant are described. The results of the geologic work, drilling activities and reservoir studies are summarized. In addition, sections discussing the historical costs for Union's involvement with the project, production engineering (for anticipated surface equipment), and environmental work are included. Nineteen geothermal wells have been drilled in the Redondo Creek area of the Valles Caldera: a prominent geologic feature of the Jemez mountains consisting of Pliocene and Pleistocene age volcanics. The Redondo Creek area is within a complex longitudinal graben on the northwest flank of the resurgent structural dome of Redondo Peak and Redondo Border. The major graben faults, with associated fracturing, are geologically plausible candidates for permeable and productive zones in the reservoir. The distribution of such permeable zones is too erratic and the locations too imprecisely known to offer an attractive drilling target. Log analysis indicates there is a preferred mean fracture strike of N31W in the upper portion of Redondo Creek wells. This is approximately perpendicular to the major structure in the area, the northeast-striking Redondo Creek graben. The geothermal fluid found in the Redondo Creek reservoir is relatively benign with low brine concentrations and moderate H/sub 2/S concentrations. Geothermometer calculations indicate that the reservoir temperature generally lies between 500/sup 0/F and 600/sup 0/F, with near wellbore flashing occurring during the majority of the wells' production.

  8. Geothermal Induced Seismicity National Environmental Policy Act Review

    Energy Technology Data Exchange (ETDEWEB)

    Levine, Aaron L [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Cook, Jeffrey J [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Beckers, Koenraad J [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Young, Katherine R [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-10-04

    In 2016, the U.S. Bureau of Land Management (BLM) contracted with the National Renewable Energy Laboratory (NREL) to assist the BLM in developing and building upon tools to better understand and evaluate induced seismicity caused by geothermal projects. This review of NEPA documents for four geothermal injection or EGS projects reveals the variety of approaches to analyzing and mitigating induced seismicity. With the exception of the Geysers, where induced seismicity has been observed and monitored for an extended period of time due to large volumes of water being piped in to recharge the hydrothermal reservoir, induced seismicity caused by geothermal projects is a relative new area of study. As this review highlights, determining the level of mitigation required for induced seismic events has varied based on project location, when the review took place, whether the project utilized the International Energy Agency or DOE IS protocols, and the federal agency conducting the review. While the NEPA reviews were relatively consistent for seismic monitoring and historical evaluation of seismic events near the project location, the requirements for public outreach and mitigation for induced seismic events once stimulation has begun varied considerably between the four projects. Not all of the projects were required to notify specific community groups or local government entities before beginning the project, and only one of the reviews specifically stated the project proponent would hold meetings with the public to answer questions or address concerns.

  9. Kenya geothermal private power project: A prefeasibility study

    Energy Technology Data Exchange (ETDEWEB)

    1992-10-01

    Twenty-eight geothermal areas in Kenya were evaluated and prioritized for development. The prioritization was based on the potential size, resource temperature, level of exploration risk, location, and exploration/development costs for each geothermal area. Suswa, Eburru and Arus are found to offer the best short-term prospects for successful private power development. It was found that cost per kill developed are significantly lower for the larger (50MW) than for smaller-sized (10 or 20 NW) projects. In addition to plant size, the cost per kill developed is seen to be a function of resource temperature, generation mode (binary or flash cycle) and transmission distance.

  10. The evolution of project financing in the geothermal industry

    International Nuclear Information System (INIS)

    Cardenas, G.S.; Miller, D.M.

    1990-01-01

    Sound underlying economics and beneficial contractual relationships are the fundamentals of any project financing. Given these essential elements, the successful transaction must properly allocate the costs, benefits and risks to the appropriate participants in the most efficient manner. In this paper the authors examine four instances in which project financing offered optimal solutions to this problem in a series of transactions for the successive development of the 70 MW Ormesa Geothermal Energy Complex in the Imperial Valley of California

  11. Parcperdue Geopressure -- Geothermal Project: Appendix E

    Energy Technology Data Exchange (ETDEWEB)

    Sweezy, L.R.

    1981-10-05

    The mechanical and transport properties and characteristics of rock samples obtained from DOW-DOE L.R. SWEEZY NO. 1 TEST WELL at the Parcperdue Geopressure/Geothermal Site have been investigated in the laboratory. Elastic moduli, compressibility, uniaxial compaction coefficient, strength, creep parameters, permeability, acoustic velocities (all at reservoir conditions) and changes in these quantities induced by simulated reservoir production have been obtained from tests on several sandstone and shale samples from different depths. Most important results are that the compaction coefficients are approximately an order of magnitude lower than those generally accepted for the reservoir sand in the Gulf Coast area and that the creep behavior is significant. Geologic characterization includes lithological description, SEM micrographs and mercury intrusion tests to obtain pore distributions. Petrographic analysis shows that approximately half of the total sand interval has excellent reservoir potential and that most of the effective porosity in the Cib Jeff Sand is formed by secondary porosity development.

  12. Southwest Alaska Regional Geothermal Energy Project

    Energy Technology Data Exchange (ETDEWEB)

    Holdmann, Gwen [Univ. of Alaska, Fairbanks, AK (United States)

    2015-04-30

    The village of Elim, Alaska is 96 miles west of Nome, on the Seward Peninsula. The Darby Mountains north of the village are rich with hydrothermal systems associated with the Darby granitic pluton(s). In addition to the hot springs that have been recorded and studied over the last 100 years, additional hot springs exist. They are known through a rich oral history of the region, though they are not labeled on geothermal maps. This research primarily focused on Kwiniuk Hot Springs, Clear Creek Hot Springs and Molly’s Hot Springs. The highest recorded surface temperatures of these resources exist at Clear Creek Hot Springs (67°C). Repeated water sampling of the resources shows that maximum temperatures at all of the systems are below boiling.

  13. National Conference of State Legislators Geothermal Project. Final report, February 1978-September 1982

    Energy Technology Data Exchange (ETDEWEB)

    1982-01-01

    The activities of the National Conference of State Legislatures Geothermal Project in stimulating and assessing state legislative action to encourage the efficient development of geothermal resources, including the use of ground water heat pumps, are reviewed by state. (MHR)

  14. The drama of Puna: For and against the Hawai'i geothermal project

    Science.gov (United States)

    Keyser, William Henry

    The geothermal project was conceived in the context of the international oil business and the economic growth of Hawai'i. From the point of view of the State, the geothermal project is necessary because imported petroleum provides Hawai'i with 911/2 percent of its total energy. That petroleum consists of 140,000 b/d of crude (1990) and it comes from Alaska, Indonesia and a few other suppliers. However, the Alaskan North Slope is beginning to run dry and the Southeast Asian suppliers of crude will be exporting less petroleum as time goes on. Increasingly, Hawai'i will become dependent on "unstable Middle Eastern" suppliers of crude. From this worry about the Middle East, the State seeks indigenous energy to reduce its dependence on petroleum and to support economic growth. Hence, the geothermal project was born after the 1973 oil embargo. The major source of geothermal energy is the Kilauea Volcano on the Big Island. Kilauea is characterized by the Kilauea caldera and a crack in the Island which extends easterly from the caldera to Cape Kumukahi in Puna and southwest to Pahala in Ka'u. The eastern part of the crack is approximately 55 kilometers long and 5 kilometers wide. The geothermal plants will sit on this crack. While the State has promoted the geothermal project with the argument of reducing "dependence" on imported petroleum, it hardly mentions its goal of economic growth. The opponents have resisted the project on the grounds of protecting Pele and Hawaiian gathering rights, protecting the rain forest, and stopping the pollution in the geothermal steam. What the opponents do not mention is their support for economic growth. The opposition to the project suggests a new environmental politics is forming in Hawai'i. Is this true? The dissertation will show that the participants in this drama are involved in a strange dance where each side avoids any recognition of their fundamental agreement on economic growth. Hence the creation of a new environmental

  15. Gulf Coast Programmatic Environmental Assessment Geothermal Well Testing: The Frio Formation of Texas and Louisiana

    Energy Technology Data Exchange (ETDEWEB)

    None

    1977-10-01

    In accordance with the requirements of 10 CFR Part 711, environmental assessments are being prepared for significant activities and individual projects of the Division of Geothermal Energy (DGE) of the Energy Research and Development Administration (ERDA). This environmental assessment of geopressure well testing addresses, on a regional basis, the expected activities, affected environments, and possible impacts in a broad sense. The specific part of the program addressed by this environmental assessment is geothermal well testing by the take-over of one or more unsuccessful oil wells before the drilling rig is removed and completion of drilling into the geopressured zone. Along the Texas and Louisiana Gulf Coast (Plate 1 and Overlay) water at high temperatures and high pressures is trapped within Gulf basin sediments. The water is confined within or below essentially impermeable shale sequences and carries most or all of the overburden pressure. Such zones are referred to as geopressured strata. These fluids and sediments are heated to abnormally high temperatures (up to 260 C) and may provide potential reservoirs for economical production of geothermal energy. The obvious need in resource development is to assess the resource. Ongoing studies to define large-sand-volume reservoirs will ultimately define optimum sites for drilling special large diameter wells to perform large volume flow production tests. In the interim, existing well tests need to be made to help define and assess the resource. The project addressed by this environmental assessment is the performance of a geothermal well test in high potential geothermal areas. Well tests involve four major actions each of which may or may not be required for each of the well tests. The four major actions are: site preparation, drilling a salt-water disposal well, actual flow testing, and abandonment of the well.

  16. Application for Underground Injection Control Permit for the PUNA Geothermal Venture Project

    Energy Technology Data Exchange (ETDEWEB)

    None

    1989-06-01

    Puna Geothermal Venture (PGV) plans to construct and operate the 25 MW Puna Geothermal Venture Project in the Puna District of the Island of Hawaii. The project will drill geothermal wells within a dedicated 500-acre project area, use the produced geothermal fluid to generate electricity for sale to the Hawaii Electric Light Company for use on the Island of Hawaii, and inject all the produced geothermal fluids back into the geothermal reservoir. Since the project will use injection wells, it will require an Underground Injection Control (UIC) permit from the Drinking Water Section of the State of Hawaii Department of Health. The PGV Project is consistent with the State and County of Hawaii's stated objectives of providing energy self-sufficiency and diversifying Hawaii's economic base. The project will develop a new alternate energy source as well as provide additional information about the nature of the geothermal resource.

  17. Environmental impacts of open loop geothermal system on groundwater

    Science.gov (United States)

    Kwon, Koo-Sang; Park, Youngyun; Yun, Sang Woong; Lee, Jin-Yong

    2013-04-01

    Application of renewable energies such as sunlight, wind, rain, tides, waves and geothermal heat has gradually increased to reduce emission of CO2 which is supplied from combustion of fossil fuel. The geothermal energy of various renewable energies has benefit to be used to cooling and heating systems and has good energy efficiency compared with other renewable energies. However, open loop system of geothermal heat pump system has possibility that various environmental problems are induced because the system directly uses groundwater to exchange heat. This study was performed to collect data from many documents such as papers and reports and to summarize environmental impacts for application of open loop system. The environmental impacts are classified into change of hydrogeological factors such as water temperature, redox condition, EC, change of microbial species, well contamination and depletion of groundwater. The change of hydrogeological factors can induce new geological processes such as dissolution and precipitation of some minerals. For examples, increase of water temperature can change pH and Eh. These variations can change saturation index of some minerals. Therefore, dissolution and precipitation of some minerals such as quartz and carbonate species and compounds including Fe and Mn can induce a collapse and a clogging of well. The well contamination and depletion of groundwater can reduce available groundwater resources. These environmental impacts will be different in each region because hydrogeological properties and scale, operation period and kind of the system. Therefore, appropriate responses will be considered for each environmental impact. Also, sufficient study will be conducted to reduce the environmental impacts and to improve geothermal energy efficiency during the period that a open loop system is operated. This work was supported by the Energy Efficiency and Resources of the Korea Institute of Energy Technology Evaluation and Planning

  18. Use of environmental radioactive isotopes in geothermal prospecting

    International Nuclear Information System (INIS)

    Balcazar, M.; Lopez M, A.; Huerta, M.; Flores R, J. H.; Pena, P.

    2010-10-01

    Oil resources decrease and environmental impact of burning fossil fuels support the use of alternative energies around the world. By far nuclear energy is the alternative which can supply huge amount of clean energy. Mexico has two nuclear units and has also explored and exploited the use of other complementary renewal energies, as wind and geothermal. Mexico is the third geothermal-energy producer in the world with an installed capacity of 960 MW and is planning the installation of 146 MW for the period 2010-2011, according to information of the Mexican Federal Electricity Board. This paper presents a study case, whose goal is to look for areas where the heat source can be located in geothermal energy fields under prospecting. The method consist in detecting a natural radioactive tracer, which is transported to the earth surface by geo-gases, generated close to the heat source, revealing areas of high permeability properties and open active fractures. Those areas are cross correlated to other resistivity, gravimetric and magnetic geophysical parameters in the geothermal filed to better define the heat source in the field. (Author)

  19. Guanacaste Geothermal Project. Technical prefeasibility report. Annex C. Electric resistivity

    Energy Technology Data Exchange (ETDEWEB)

    1976-12-01

    This report is the third of six annexes to the Summary Report on the First Phase of the Guanacaste Geothermal Project. The studies covered an area of 500 km/sup 2/ on the SW flanks of the Rincon de la Vieja and Miravalles volcanoes of the Guanacaste Volcanic Range in NW Costa Rica, and were aimed at locating zones of high geothermal gradient, and reconstruction of the stratigraphic column. The formations in the area under study can be grouped into six resistivity ranges, varying from less than 5 to more than 200 ohm-meters. Values from 200 to as high as 30,000 ohm-meters generally correspond to fractured and porous lavas, their fracturing and porosity, as well as their drainability, increasing with resistivity. The values above 100 ohm-meters were recorded in zones of recent lava flows, in spurs of the volcanoes Rincon de la Vieja and Santa Maria, and in the slopes of the Miravalles volcano, and correspond to shallow formations (maximum depths of 150 meters) which may constitute recharge zones for the underground aquifiers. The values in the 100 to 200 ohm-meter range were generally recorded directly under layers constituted by drained, porous lavas, or under shallow layers where no recent lavas are present. The third group comprises materials with resistivities in the 25 to 100 ohm-meter range, occurring at two different depth levels: a deep one (more than 1000 meters) and a shallow one (less than 400 meters). Resistivities less than 25 ohm-meters were recorded at depths of 250 meters and more, and may correspond to material typical of the Aguacate formation, which probably constitutes the reservoir rock of the geothermal fluids. In order to locate the zones of most geothermal interest, this range was classified into the three remaining of the six groups, viz 10 to 25, 5 to 10, and less than 5 ohm-meters, the last group appearing to be that of greatest geothermal potential.

  20. Geothermal direct-heat utilization assistance. Quarterly project progress report, April--June 1993

    Energy Technology Data Exchange (ETDEWEB)

    Lienau, P.

    1993-06-01

    Technical assistance was provided to 60 requests from 19 states. R&D progress is reported on: evaluation of lineshaft turbine pump problems, geothermal district heating marketing strategy, and greenhouse peaking analysis. Two presentations and one tour were conducted, and three technical papers were prepared. The Geothermal Progress Monitor reported: USGS Forum on Mineral Resources, Renewable Energy Tax Credits Not Working as Congress Intended, Geothermal Industry Tells House Panel, Newberry Pilot Project, and Low-Temperature Geothermal Resources in Nevada.

  1. Geothermal energy in the western United States and Hawaii: Resources and projected electricity generation supplies. [Contains glossary and address list of geothermal project developers and owners

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    Geothermal energy comes from the internal heat of the Earth, and has been continuously exploited for the production of electricity in the United States since 1960. Currently, geothermal power is one of the ready-to-use baseload electricity generating technologies that is competing in the western United States with fossil fuel, nuclear and hydroelectric generation technologies to provide utilities and their customers with a reliable and economic source of electric power. Furthermore, the development of domestic geothermal resources, as an alternative to fossil fuel combustion technologies, has a number of associated environmental benefits. This report serves two functions. First, it provides a description of geothermal technology and a progress report on the commercial status of geothermal electric power generation. Second, it addresses the question of how much electricity might be competitively produced from the geothermal resource base. 19 figs., 15 tabs.

  2. Native Hawaiian Ethnographic Study for the Hawaii Geothermal Project Proposed for Puna and Southeast Maui

    Energy Technology Data Exchange (ETDEWEB)

    Matsuoka, J.K; Minerbi, L. [Cultural Advocacy Network for Developing Options (CANDO) (United States); Kanahele, P.; Kelly, M.; Barney-Campbell, N.; Saulsbury [Oak Ridge National Lab., TN (United States); Trettin, L.D. [Tennessee Univ., Knoxville, TN (United States)

    1996-05-01

    This report makes available and archives the background scientific data and related information collected for an ethnographic study of selected areas on the islands of Hawaii and Maui. The task was undertaken during preparation of an environmental impact statement for Phases 3 and 4 of the Hawaii Geothermal Project (HGP) as defined by the state of Hawaii in its April 1989 proposal to Congress. Since the state of Hawaii is no longer pursuing or planning to pursue the HGP, DOE considers the project to be terminated. Information is included on the ethnohistory of Puna and southeast Maui; ethnographic fieldwork comparing Puna and southeast Maui; and Pele beliefs, customs, and practices.

  3. Hotspot: the Snake River Geothermal Drilling Project--initial report

    Science.gov (United States)

    Shervais, J.W.; Nielson, D.; Lachmar, T.; Christiansen, E.H.; Morgan, L.; Shanks, Wayne C.; Delahunty, C.; Schmitt, D.R.; Liberty, L.M.; Blackwell, D.D.; Glen, J.M.; Kessler, J.A.; Potter, K.E.; Jean, M.M.; Sant, C.J.; Freeman, T.

    2012-01-01

    The Snake River volcanic province (SRP) overlies a thermal anomaly that extends deep into the mantle; it represents one of the highest heat flow provinces in North America. The primary goal of this project is to evaluate geothermal potential in three distinct settings: (1) Kimama site: inferred high sub-aquifer geothermal gradient associated with the intrusion of mafic magmas, (2) Kimberly site: a valley-margin setting where surface heat flow may be driven by the up-flow of hot fluids along buried caldera ringfault complexes, and (3) Mountain Home site: a more traditional fault-bounded basin with thick sedimentary cover. The Kimama hole, on the axial volcanic zone, penetrated 1912 m of basalt with minor intercalated sediment; no rhyolite basement was encountered. Temperatures are isothermal through the aquifer (to 960 m), then rise steeply on a super-conductive gradient to an estimated bottom hole temperature of ~98°C. The Kimberly hole is on the inferred margin of a buried rhyolite eruptive center, penetrated rhyolite with intercalated basalt and sediment to a TD of 1958 m. Temperatures are isothermal at 55-60°C below 400 m, suggesting an immense passive geothermal resource. The Mountain Home hole is located above the margin of a buried gravity high in the western SRP. It penetrates a thick section of basalt and lacustrine sediment overlying altered basalt flows, hyaloclastites, and volcanic sediments, with a TD of 1821 m. Artesian flow of geothermal water from 1745 m depth documents a power-grade resource that is now being explored in more detail. In-depth studies continue at all three sites, complemented by high-resolution gravity, magnetic, and seismic surveys, and by downhole geophysical logging.

  4. Geothermal projects funded under the NER 300 programme - current state of development and knowledge gained

    Science.gov (United States)

    Shortall, Ruth; Uihlein, Andreas

    2017-04-01

    Introduction The NER 300 programme, managed by the European Commission is one of the largest funding programmes for innovative low-carbon energy demonstration projects. NER 300 is so called because it is funded from the sale of 300 million emission allowances from the new entrants' reserve (NER) set up for the third phase of the EU emissions trading system (ETS). The programme aims to successfully demonstrate environmentally safe carbon capture and storage (CCS) and innovative renewable energy (RES) technologies on a commercial scale with a view to scaling up production of low-carbon technologies in the EU. Consequently, it supports a wide range of CCS and RES technologies (bioenergy, concentrated solar power, photovoltaics, geothermal, wind, ocean, hydropower, and smart grids). Funded projects and the role of geothermal projects for the programme In total, about EUR 2.1 billion have been awarded through the programme's 2 calls for proposals (the first awarded in December 2012, the second in July 2014). The programme has awarded around EUR 70 million funding to 3 geothermal projects in Hungary, Croatia and France. The Croatian geothermal project will enter into operation during 2017 the Hungarian in 2018, and the French in 2020. Knowledge Sharing Knowledge sharing requirements are built into the legal basis of the programme as a critical tool to lower risks in bridging the transition to large-scale production of innovative renewable energy and CCS deployment. Projects have to submit annually to the European Commission relevant knowledge gained during that year in the implementation of their project. The relevant knowledge is aggregated and disseminated by the European Commission to industry, research, government, NGO and other interest groups and associations in order to provide a better understanding of the practical challenges that arise in the important step of scaling up technologies and operating them at commercial scale. The knowledge sharing of the NER 300

  5. Geothermal Energy Development annual report 1979

    Energy Technology Data Exchange (ETDEWEB)

    1980-08-01

    This report is an exerpt from Earth Sciences Division Annual Report 1979 (LBL-10686). Progress in thirty-four research projects is reported including the following area: geothermal exploration technology, geothermal energy conversion technology, reservoir engineering, and geothermal environmental research. Separate entries were prepared for each project. (MHR)

  6. Hot Dry Rock Geothermal Energy Development Project. Annual report, fiscal year 1977

    Energy Technology Data Exchange (ETDEWEB)

    1978-02-01

    The feasibility of extracting geothermal energy from hot dry rock in the earth's crust was investigated. The concept being investigated involves drilling a deep hole, creating an artificial geothermal reservoir at the bottom of the hole by hydraulic fracturing, and then intersecting the fracture with a second borehole. At the beginning of FY77, the downhole system was complete, but the impedance to the flow of fluid was too high to proceed confidently with the planned energy extraction demonstration. Therefore, in FY77 work focused on an intensive investigation of the characteristics of the downhole system and on the development of the necessary tools and techniques for understanding and improving it. Research results are presented under the following section headings: introduction and history; hot dry rock resource assessment and site selection; instrumentation and equipment development; drilling and fracturing; reservoir engineering; energy extraction system; environmental studies; project management and liaison; and, looking back and ahead. (JGB)

  7. Draft Executive Summary Hawaii Geothermal Project - EIS Scoping Meetings

    Energy Technology Data Exchange (ETDEWEB)

    None

    1992-03-01

    After introductions by the facilitator and the program director from DOE, process questions were entertained. It was also sometimes necessary to make clarifications as to process throughout the meetings. Topics covered federal involvement in the HGP-EIS; NEPA compliance; public awareness, review, and access to information; Native Hawaiian concerns; the record of decision, responsibility with respect to international issues; the impacts of prior and on-going geothermal development activities; project definition; alternatives to the proposed action; necessary studies; Section 7 consultations; socioeconomic impacts; and risk analysis. Presentations followed, in ten meetings, 163 people presented issues and concerns, 1 additional person raised process questions only.

  8. Opportunities for Small Geothermal Projects: Rural Power for Latin America, the Caribbean, and the Philippines

    Energy Technology Data Exchange (ETDEWEB)

    Vimmerstedt, L.

    1998-11-30

    The objective of this report is to provide information on small geothermal project (less than 5 MW) opportunities in Latin America, the Caribbean, and the Philippines. This overview of issues facing small geothermal projects is intended especially for those who are not already familiar with small geothermal opportunities. This is a summary of issues and opportunities and serves as a starting point in determining next steps to develop this market.

  9. Opportunities for Small Geothermal Projects: Rural Power for Latin America, the Caribbean, and the Philippines

    International Nuclear Information System (INIS)

    Vimmerstedt, L.

    1998-01-01

    The objective of this report is to provide information on small geothermal project (less than 5 MW) opportunities in Latin America, the Caribbean, and the Philippines. This overview of issues facing small geothermal projects is intended especially for those who are not already familiar with small geothermal opportunities. This is a summary of issues and opportunities and serves as a starting point in determining next steps to develop this market

  10. Geothermal energy

    International Nuclear Information System (INIS)

    Rummel, F.; Kappelmeyer, O.; Herde, O.A.

    1992-01-01

    Objective of this brochure is to present the subject Geothermics and the possible use of geothermal energy to the public. The following aspects will be refered to: -present energy situation -geothermal potential -use of geothermal energy -environemental aspects -economics. In addition, it presents an up-dated overview of geothermal projects funded by the German government, and a list of institutions and companies active in geothermal research and developments. (orig./HP) [de

  11. Strategies for compensating for higher costs of geothermal electricity with environmental benefits

    International Nuclear Information System (INIS)

    Murphy, H.; Niitsuma, Hiroaki

    1999-01-01

    After very high growth in the 1980s, geothermal electricity production has slowed in the mid- and late-1990s. While Japanese, Indonesian and Philippine geothermal growth has remained high as a consequence of supportive government policies, geothermal electricity production has been flat or reduced in much of Europe and North America. Low prices for coal and natural gas, combined with deregulation, means that in much of the world electricity from new fuel-burning electricity plants can be provided at half the cost of new geothermal electricity. Cost-cutting must be pursued, but is unlikely to close the price gap by itself. Geothermal production is widely perceived as being environmentally clean, but this is not unambiguously true, and requires reinjection to be fully realized. Strategies for monetizing the environmental advantages of geothermal, including the carbon tax, are discussed. (author)

  12. Geothermal Energy

    International Nuclear Information System (INIS)

    Haluska, Oscar P.; Tangir, Daniel; Perri, Matias S.

    2002-01-01

    A general overview of geothermal energy is given that includes a short description of the active and stable areas in the world. The possibilities of geothermal development in Argentina are analyzed taking into account the geothermal fields of the country. The environmental benefits of geothermal energy are outlined

  13. Geothermal energy in the western United States and Hawaii: Resources and projected electricity generation supplies

    International Nuclear Information System (INIS)

    1991-09-01

    Geothermal energy comes from the internal heat of the Earth, and has been continuously exploited for the production of electricity in the United States since 1960. Currently, geothermal power is one of the ready-to-use baseload electricity generating technologies that is competing in the western United States with fossil fuel, nuclear and hydroelectric generation technologies to provide utilities and their customers with a reliable and economic source of electric power. Furthermore, the development of domestic geothermal resources, as an alternative to fossil fuel combustion technologies, has a number of associated environmental benefits. This report serves two functions. First, it provides a description of geothermal technology and a progress report on the commercial status of geothermal electric power generation. Second, it addresses the question of how much electricity might be competitively produced from the geothermal resource base. 19 figs., 15 tabs

  14. The Idea of an Innovated Concept of the Košice Geothermal Project

    Directory of Open Access Journals (Sweden)

    Bujanská Alena

    2015-11-01

    Full Text Available Slovakia has very limited amounts of fossil resources. However, it has a relatively high potential of geothermal energy which use is far below its possibilities. The most abundant geothermal resource, not only in Slovakia but throughout the central Europe, is Košice basin. Since the publication of the first ideas about the ambitious goal to exploit the geothermal potential of this site, 20 years has passed and three geothermal wells has been made but without any progress. In the article the authors present the idea of a fundamental change in the approach to improve the energy and economic efficiency of the project.

  15. The geothermal power organization

    Energy Technology Data Exchange (ETDEWEB)

    Scholl, K.L. [National Renewable Energy Lab., Golden, CO (United States)

    1997-12-31

    The Geothermal Power Organization is an industry-led advisory group organized to advance the state-of-the-art in geothermal energy conversion technologies. Its goal is to generate electricity from geothermal fluids in the most cost-effective, safe, and environmentally benign manner possible. The group achieves this goal by determining the Member`s interest in potential solutions to technological problems, advising the research and development community of the needs of the geothermal energy conversion industry, and communicating research and development results among its Members. With the creation and adoption of a new charter, the Geothermal Power Organization will now assist the industry in pursuing cost-shared research and development projects with the DOE`s Office of Geothermal Technologies.

  16. Environmental analysis of geopressured-geothermal prospect areas, Brazoria and Kenedy Counties, Texas

    Energy Technology Data Exchange (ETDEWEB)

    White, W.A.; McGraw, M.; Gustavson, T.C.

    1978-01-01

    Preliminary environmental data, including current land use, substrate lithology, soils, natural hazards, water resources, biological assemblages, meteorological data, and regulatory considerations have been collected and analyzed for approximately 150 km/sup 2/ of land: (1) near Chocolate Bayou, Brazoria County, Texas, where a geopressured-geothermal test well was drilled in 1978, and (2) near the rural community of Armstrong, Kenedy County, Texas, where future geopressured-geothermal test well development may occur. The study was designed to establish an environmental data base and to determine, within spatial constraints set by subsurface reservoir conditions, environmentally suitable sites for geopressured-geothermal wells.

  17. Geothermal R and D Project report for period July 1, 1976 to September 30, 1976

    Energy Technology Data Exchange (ETDEWEB)

    Kunze, J.F. (ed.)

    1976-12-01

    Progress in the third quarter of 1976 is reported for the geothermal energy projects conducted by or under the direction of the Idaho National Engineering Laboratory of the Energy Research and Development Administration. These projects include the Raft River geothermal development within reservoir and surface testing programs; the Boise Space Heating Project; the design and analysis of power conversion concepts for generating electricity from moderate temperature (approximately 150/sup 0/C or 300/sup 0/F) resources; advanced heat exchanger research and testing; and studies relating to a variety of direct uses of geothermal heat energy.

  18. Two 175 ton geothermal chiller heat pumps for leed platinum building technology demonstration project. Operation data, data collection and marketing

    Energy Technology Data Exchange (ETDEWEB)

    Kolo, Daniel [Johnson Controls, Inc., Glendale, WI (United States)

    2016-08-15

    The activities funded by this grant helped educate and inform approximately six thousand individuals who participated in guided tours of the geothermal chiller plant at Johnson Controls Corporate Headquarters in Glendale, Wisconsin over the three year term of the project. In addition to those who took the formal tour, thousands more were exposed to hands-on learning at the self-service video kiosks located in the headquarters building and augmented reality tablet app that allowed for self-guided tours. The tours, video, and app focused on the advantages of geothermal heat pump chillers, including energy savings and environmental impact. The overall tour and collateral also demonstrated the practical application of this technology and how it can be designed into a system that includes many other sustainable technologies without sacrificing comfort or health of building occupants Among tour participants were nearly 1,000 individuals, representing 130 organizations identified as potential purchasers of geothermal heat pump chillers. In addition to these commercial clients, tours were well attended by engineering, facilities, and business trade groups. This has also been a popular tour for groups from Universities around the Midwest and K-12 schools from Wisconsin and Northern Illinois A sequence of operations was put into place to control the chillers and they have been tuned and maintained to optimize the benefit from the geothermal water loop. Data on incoming and outgoing water temperature and flow from the geothermal field was logged and sent to DOE monthly during the grant period to demonstrate energy savings.

  19. Geothermal environmental studies, Heber Region, Imperial Valley, California. Environmental baseline data acquisition. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1977-02-01

    The Electric Power Research Institute (EPRI) has been studying the feasibility of a Low Salinity Hydrothermal Demonstration Plant as part of its Geothermal Energy Program. The Heber area of the Imperial Valley was selected as one of the candidate geothermal reservoirs. Documentation of the environmental conditions presently existing in the Heber area is required for assessment of environmental impacts of future development. An environmental baseline data acquisition program to compile available data on the environment of the Heber area is reported. The program included a review of pertinent existing literature, interviews with academic, governmental and private entities, combined with field investigations and meteorological monitoring to collect primary data. Results of the data acquisition program are compiled in terms of three elements: the physical, the biological and socioeconomic settings.

  20. Great Western Malting Company geothermal project, Pocatello, Idaho. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Christensen, N.T.; McGeen, M.A.; Corlett, D.F.; Urmston, R.

    1981-12-23

    The Great Western Malting Company recently constructed a barley malting facility in Pocatello, Idaho, designed to produce 6.0 million bushels per year of brewing malt. This facility uses natural gas to supply the energy for germination and kilning processes. The escalating cost of natural gas has prompted the company to look at alternate and more economical sources of energy. Trans Energy Systems has investigated the viabiity of using geothermal energy at the new barley processing plant. Preliminary investigations show that a geothermal resource probably exists, and payback on the installation of a system to utilize the resource will occur in under 2 years. The Great Western Malting plant site has geological characteristics which are similar to areas where productive geothermal wells have been established. Geological investigations indicate that resource water temperatures will be in the 150 to 200/sup 0/F range. Geothermal energy of this quality will supply 30 to 98% of the heating requirements currently supplied by natural gas for this malting plant. Trans Energy Systems has analyzed several systems of utilizing the geothermal resource at the Great Western barley malting facility. These systems included: direct use of geothermal water; geothermal energy heating process water through an intermediary heat exchanger; coal or gas boosted geothermal systems; and heat pump boosted geothermal system. The analysis examined the steps that are required to process the grain.

  1. Evaluation of the environmental sustainability of a micro CHP system fueled by low-temperature geothermal and solar energy

    International Nuclear Information System (INIS)

    Ruzzenenti, Franco; Bravi, Mirko; Tempesti, Duccio; Salvatici, Enrica; Manfrida, Giampaolo; Basosi, Riccardo

    2014-01-01

    Highlights: • Binary, ORC technology avoids CO 2 , but raises questions about environmental impact. • We proposed a micro-size system that combines geothermal energy with solar energy. • The small scale and the solar energy input edges the energy profitability. • The system’s performance is appreciable if applied to existing wells. • The feasibility of exploiting abandoned wells is preliminarily evaluated. - Abstract: In this paper we evaluate the environmental sustainability of a small combined heat and power (CHP) plant operating through an Organic Rankine Cycle (ORC). The heat sources of the system are from geothermal energy at low temperature (90–95 °C) and solar energy. The designed system uses a solar field composed only of evacuated, non-concentrating solar collectors, and work is produced by a single turbine of 50 kW. The project addresses an area of Tuscany, but it could be reproduced in areas where geothermal energy is extensively developed. Therefore, the aim is to exploit existing wells that are either unfit for high-enthalpy technology, abandoned or never fully developed. Furthermore, this project aims to aid in downsizing the geothermal technology in order to reduce the environmental impact and better tailor the production system to the local demand of combined electric and thermal energy. The environmental impact assessment was performed through a Life Cycle Analysis and an Exergy Life Cycle Analysis. According to our findings the reservoir is suitable for a long-term exploitation of the designed system, however, the sustainability and the energy return of this latter is edged by the surface of the heat exchanger and the limited running hours due to the solar plant. Therefore, in order to be comparable to other renewable resources or geothermal systems, the system needs to develop existing wells, previously abandoned

  2. Guanacaste Geothermal Project. Technical prefeasibility report. Annex E. Geohydrology

    Energy Technology Data Exchange (ETDEWEB)

    1976-12-01

    This report is the fifth of six annexes to the Summary Report on the First Phase of the Guanacaste Geothermal Project. The studies covered an area of 500 km/sup 2/ on the SW flanks of the Rincon de la Vieja and Miravalles volcanoes of the Guanacaste Volcanic Range in NW Costa Rica, and were aimed at locating zones of high geothermal gradient, and reconstruction of the stratigraphic column. An estimate was made of the annual and low-water mark water reserves. Balances were also made for each basin taking into consideration precipitation, evapo-transpiration, and runoff. Determinations were also made of effluent and influent stream, recharge, and deep water circulation zones, and water tables. An underground flow pattern was observed, extending from the volcanic massifs where recharge takes place, to the plains near the Panamerican Highway. Using silica, specific conductivity, and chlorides as natural tracers, it was concluded that the underground and surface drainage patterns generally coincide. In the area around the Miravalles volcano, a zone was found near the township of Guayabal where seepage of deep waters appears to take place, showing high silica and chloride contents (more than 150 and 50 ppM respectively), and high conductivity (more than 500 mhos-cm). Springs with low mineral content, which could be associated with shallow circulation waters, are also present in this zone. This could be indicative of the existence of two horizons, a cold one above and a hot one below, separated by an impermeable layer. Another instance of seepage of deep waters is observed in the zone around the township of Salitral de Bagaces and the Aguas Calientes River. In the northeastern part of the area under study, it was observed that the underground drainage pattern conforms to the surface drainage of the Salitral and Tizate rivers.

  3. Environmental considerations for geothermal energy as a source for district heating

    International Nuclear Information System (INIS)

    Rafferty, K.D.

    1996-01-01

    Geothermal energy currently provides a stable and environmentally attractive heat source for approximately 20 district heating (DH) systems in the US. The use of this resource eliminates nearly 100% of the conventional fuel consumption (and, hence, the emissions) of the loads served by these systems. As a result, geothermal DH systems can rightfully claim the title of the most fuel-efficient DH systems in operation today. The cost of producing heat from a geothermal resource (including capitalization of the production facility and cost for pumping) amounts to an average of $1.00 per million Btu (0.0034 $/kWh). The major environmental challenge for geothermal systems is proper management of the producing aquifer. Many systems are moving toward injection of the geothermal fluids to ensure long-term production

  4. Geothermal power plants principles, applications, case studies and environmental impact

    CERN Document Server

    DiPippo, Ronald

    2008-01-01

    Ron DiPippo, Professor Emeritus at the University of Massachusetts Dartmouth, is a world-regarded geothermal expert. This single resource covers all aspects of the utilization of geothermal energy for power generation from fundamental scientific and engineering principles. The thermodynamic basis for the design of geothermal power plants is at the heart of the book and readers are clearly guided on the process of designing and analysing the key types of geothermal energy conversion systems. Its practical emphasis is enhanced by the use of case studies from real plants that increase the reader'

  5. Geothermal Program Review XI: proceedings. Geothermal Energy - The Environmental Responsible Energy Technology for the Nineties

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-01

    These proceedings contain papers pertaining to current research and development of geothermal energy in the USA. The seven sections of the document are: Overview, The Geysers, Exploration and Reservoir Characterization, Drilling, Energy Conversion, Advanced Systems, and Potpourri. The Overview presents current DOE energy policy and industry perspectives. Reservoir studies, injection, and seismic monitoring are reported for the geysers geothermal field. Aspects of geology, geochemistry and models of geothermal exploration are described. The Drilling section contains information on lost circulation, memory logging tools, and slim-hole drilling. Topics considered in energy conversion are efforts at NREL, condensation on turbines and geothermal materials. Advanced Systems include hot dry rock studies and Fenton Hill flow testing. The Potpourri section concludes the proceedings with reports on low-temperature resources, market analysis, brines, waste treatment biotechnology, and Bonneville Power Administration activities. Selected papers have been indexed separately for inclusion in the Energy Science and Technology Database.

  6. Optimizing Seismic Monitoring Networks for EGS and Conventional Geothermal Projects

    Science.gov (United States)

    Kraft, Toni; Herrmann, Marcus; Bethmann, Falko; Stefan, Wiemer

    2013-04-01

    In the past several years, geological energy technologies receive growing attention and have been initiated in or close to urban areas. Some of these technologies involve injecting fluids into the subsurface (e.g., oil and gas development, waste disposal, and geothermal energy development) and have been found or suspected to cause small to moderate sized earthquakes. These earthquakes, which may have gone unnoticed in the past when they occurred in remote sparsely populated areas, are now posing a considerable risk for the public acceptance of these technologies in urban areas. The permanent termination of the EGS project in Basel, Switzerland after a number of induced ML~3 (minor) earthquakes in 2006 is one prominent example. It is therefore essential for the future development and success of these geological energy technologies to develop strategies for managing induced seismicity and keeping the size of induced earthquakes at a level that is acceptable to all stakeholders. Most guidelines and recommendations on induced seismicity published since the 1970ies conclude that an indispensable component of such a strategy is the establishment of seismic monitoring in an early stage of a project. This is because an appropriate seismic monitoring is the only way to detect and locate induced microearthquakes with sufficient certainty to develop an understanding of the seismic and geomechanical response of the reservoir to the geotechnical operation. In addition, seismic monitoring lays the foundation for the establishment of advanced traffic light systems and is therefore an important confidence building measure towards the local population and authorities. We have developed an optimization algorithm for seismic monitoring networks in urban areas that allows to design and evaluate seismic network geometries for arbitrary geotechnical operation layouts. The algorithm is based on the D-optimal experimental design that aims to minimize the error ellipsoid of the linearized

  7. Innovative approach for risk assessment in green field geothermal project

    NARCIS (Netherlands)

    Batini, F.; Wees, J.-D. van

    2010-01-01

    At present, the worldwide geothermal energy production provides less than 1% of the world's energy needs but the geothermal resources confined in the first 6 km of the earth's crust are estimated to be in the fairly above 200 GW of which 50-80 GW are located in Europe. Exploring and developing at

  8. Environmental overview for the development of geothermal resources in the State of New Mexico. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Bryant, M.; Starkey, A.H.; Dick-Peddie, W.A.

    1980-06-01

    A brief overview of the present day geothermal applications for hydrothermal electrical generation and direct heat use and their environmental implications is provided. Technologies and environmental impacts are considered at all points on the pathway of development resource exploration; well field, plant and transmission line construction; and plant operation. The technologies for electrical generation-direct, dry steam conversion; separated steam conversion; single-flash conversion, separated-steam/single-flash conversion and binary cycle conversion and the technologies for direct heat use - direct use of geothermal waters, surface heat exhanger, down-the hole heat exchanger and heat pump are described. A summary of the geothermal technologies planned or in operation within New Mexico geothermal areas is provided. A review of regulations that affect geothermal development and its related environmental impact in New Mexico is presented. The regulatory pathway, both state and federal, of geothermal exploration after the securing of appropriate leases, development, and construction and implementation of a geothermal facility are described. Six categories (Geophysical, Water, Air, Noise, Biota and Socioeconomics) were selected for environmental assessment. The data available is described.

  9. El Centro Geothermal Utility Core Field Experiment environmental-impact report and environmental assessment

    Energy Technology Data Exchange (ETDEWEB)

    1979-08-01

    The City of El Centro is proposing the development of a geothermal energy utility core field experiment to demonstrate the engineering and economic feasibility of utilizing moderate temperature geothermal heat, on a pilot scale, for space cooling, space heating, and domestic hot water. The proposed facility is located on part of a 2.48 acre (1 hectare) parcel owned in fee by the City in the southeastern sector of El Centro in Imperial County, California. Geothermal fluid at an anticipated temperature of about 250/sup 0/F (121/sup 0/C) will heat a secondary fluid (water) which will be utilized directly or processed through an absorption chiller, to provide space conditioning and water heating for the El Centro Community Center, a public recreational facility located approximately one-half mile north of the proposed well site. The geothermal production well will be drilled to 8500 feet (2590m) and an injection well to 4000 feet (1220m) at the industrially designated City property. Once all relevant permits are obtained it is estimated that site preparation, facility construction, the completion and testing of both wells would be finished in approximately 26 weeks. The environmental impacts are described.

  10. Geothermal direct-heat utilization assistance. Quarterly project progress report, July 1996--September 1996. Federal Assistance Program

    Energy Technology Data Exchange (ETDEWEB)

    Lienau, P.

    1996-11-01

    This report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the fourth quarter of FY-96. It describes 152 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, equipment, economics and resources. Research activities are summarized on greenhouse peaking. Outreach activities include the publication of a geothermal direct use Bulletin, dissemination of information, geothermal library, technical papers and seminars, and progress monitor reports on geothermal resources and utilization.

  11. Occidental Geothermal, Inc. , Oxy geothermal power plant No. 1. Final environmental impact report

    Energy Technology Data Exchange (ETDEWEB)

    1981-12-01

    The project-specific environmental analysis covers the following: geology, soils, water resources, biology, air quality, noise, waste management, health, safety, transportation, energy and material resources, cultural resources, socioeconomics, public services, land use, and aesthetics. Other topics covered are: the cumulative envionmental analysis; unavoidable significant adverse environmental effects; irreversible environmental changes and irretrievable commitments of energy and materials; the relationship between local short-term uses of man's environment and the maintenance and enhancement of long-term productivity; growth-inducing impacts; and alternatives to the proposed action. (MHR)

  12. Geothermal energy from the earth: Its potential impact as an environmentally sustainable resource

    International Nuclear Information System (INIS)

    Mock, J.E.; Tester, J.W.; Wright, P.M.

    1997-01-01

    Geothermal energy technology is reviewed in terms of its current impact and future potential as an energy source. In general, the geothermal energy resource base is large and well distributed globally. Geothermal systems have a number of positive social characteristics (they are simple, safe, and adaptable systems with modular 1--50 MW [thermal (t) or electric (e)] plants capable of providing continuous baseload, load following, or peaking capacity) and benign environmental attributes (negligible emissions of CO 2 , SO x , NO x , and particulates, and modest land and water use). Because these features are compatible with sustainable growth of global energy supplies in both developed and developing countries, geothermal energy is an attractive option to replace fossil and fissile fuels. In 1997, about 7,000 MWe of base-load generating capacity and over 15,000 MWt of heating capacity from high-grade geothermal resources are in commercial use worldwide. 114 refs., 6 figs., 4 tabs

  13. Geothermal direct-heat utilization assistance. Quarterly project progress report, October--December 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-01

    This report summarizes geothermal technical assistance, R and D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the first quarter of FY-98 (October--December 1997). It describes 216 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include requests for general information including maps and material for high school debates, and material on geothermal heat pumps, resource and well data, space heating and cooling, greenhouses, aquaculture, equipment, district heating, resorts and spas, industrial applications, electric power and snow melting. Research activities include work on model construction specifications of lineshaft submersible pumps and plate heat exchangers, a comprehensive aquaculture developer package and revisions to the Geothermal Direct Use Engineering and Design Guidebook. Outreach activities include the publication of the Quarterly Bulletin (Vol. 18, No. 4) which was devoted entirely to geothermal activities in South Dakota, dissemination of information mainly through mailings of publications, tours of local geothermal uses, geothermal library acquisition and use, participation in workshops, short courses and technical meetings by the staff, and progress monitor reports on geothermal activities.

  14. Proceedings of second geopressured geothermal energy conference, Austin, Texas, February 23--25, 1976. Volume V. Legal, institutional, and environmental

    Energy Technology Data Exchange (ETDEWEB)

    Vanston, J.H.; Elmer, D.B.; Gustavson, T.C.; Kreitler, C.W.; Letlow, K.; Lopreato, S.C.; Meriwether, M.; Ramsey, P.; Rogers, K.E.; Williamson, J.K.

    1976-01-01

    Three separate abstracts were prepared for Volume V of the Proceedings of the Conference. Sections are entitled: Legal Issues in the Development of Geopressured--Geothermal Resources of Texas and Louisiana Gulf Coast; The Development of Geothermal Energy in the Gulf Coast; Socio-economic, Demographic, and Political Considerations; and Geothermal Resources of the Texas Gulf Coast--Environmental Concerns arising from the Production and Disposal of Geothermal waters. (MCW)

  15. Geothermal handbook

    Science.gov (United States)

    1976-01-01

    The Bureau of Land Management offered over 400,000 hectares (one million acres) for geothermal exploration and development in 1975, and figure is expected to double this year. The Energy Research and Development Administration hopes for 10-15,000 megawatts of geothermal energy by 1985, which would require, leasing over 16.3 million hectares (37 million acres) of land, at least half of which is federal land. Since there is an 8 to 8-1/2 year time laf between initial exploration and full field development, there would have to be a ten-fold increase in the amount of federal land leased within the next three years. Seventy percent of geothermal potential, 22.3 million hectares (55 million acres), is on federal lands in the west. The implication for the Service are enormous and the problems immediate. Geothermal resource are so widespread they are found to some extent in most biomes and ecosystems in the western United States. In most cases exploitation and production of geothermal resources can be made compatible with fish and wildlife management without damage, if probable impacts are clearly understood and provided for before damage has unwittingly been allowed to occur. Planning for site suitability and concern with specific operating techniques are crucial factors. There will be opportunities for enhancement: during exploration and testing many shallow groundwater bodies may be penetrated which might be developed for wildlife use. Construction equipment and materials needed for enhancement projects will be available in areas heretofore considered remote projects will be available in areas heretofore considered remote by land managers. A comprehensive knowledge of geothermal development is necessary to avoid dangers and seize opportunities. This handbook is intended to serve as a working tool in the field. It anticipated where geothermal resource development will occur in the western United States in the near future. A set of environmental assessment procedures are

  16. Imperial County geothermal development annual meeting: summary

    Energy Technology Data Exchange (ETDEWEB)

    1983-01-01

    All phases of current geothermal development in Imperial County are discussed and future plans for development are reviewed. Topics covered include: Heber status update, Heber binary project, direct geothermal use for high-fructose corn sweetener production, update on county planning activities, Brawley and Salton Sea facility status, status of Imperial County projects, status of South Brawley Prospect 1983, Niland geothermal energy program, recent and pending changes in federal procedures/organizations, plant indicators of geothermal fluid on East Mesa, state lands activities in Imperial County, environmental interests in Imperial County, offshore exploration, strategic metals in geothermal fluids rebuilding of East Mesa Power Plant, direct use geothermal potential for Calipatria industrial Park, the Audubon Society case, status report of the Cerro Prieto geothermal field, East Brawley Prospect, and precision gravity survey at Heber and Cerro Prieto geothermal fields. (MHR)

  17. Environmental impact in geothermal fields; Impacto ambiental en campos geotermicos

    Energy Technology Data Exchange (ETDEWEB)

    Birkle, P; Torres R, V; Gonzalez P, E; Guevara G, M [Instituto de Investigaciones Electricas. Departamento de Geotermia. Cuernavaca (Mexico)

    1997-12-31

    Generally, water exploitation and deep steam of geothermal fields may be cause of a pollution potential on the surface, specially by the chemical composition of geothermal water which has a high concentration of minerals, salts and heavy metals. The utilization of stable isotopes as deuterium and oxygen 18 as radioactive tracers and water origin indicators allow to know the trajectories and sources of background waters as well as possible moistures between geothermal waters and meteoric waters. Some ions such as chlorides and fluorides present solubilities that allow their register as yet long distances of their source. (Author).

  18. Geothermal power plants principles, applications, case studies and environmental impact

    CERN Document Server

    DiPippo, Ronald

    2012-01-01

    Now in its 3e, this single resource covers all aspects of the utilization of geothermal energy for power generation using fundamental scientific and engineering principles. Its practical emphasis is enhanced by the use of case studies from real plants that increase the reader's understanding of geothermal energy conversion and provide a unique compilation of hard-to-obtain data and experience. Important new chapters cover Hot Dry Rock, Enhanced Geothermal Systems, and Deep Hydrothermal Systems. New, international case studies provide practical, hands-on knowledge.

  19. Geotechnical environmental aspects of geothermal power generation at Herber, Imperial Valley, California

    Energy Technology Data Exchange (ETDEWEB)

    1976-10-01

    The feasibility of constructing a 25-50 MWe geothermal power plant using low salinity hydrothermal fluid as the energy source was assessed. Here, the geotechnical aspects of geothermal power generation and their relationship to environmental impacts in the Imperial Valley of California were investigated. Geology, geophysics, hydrogeology, seismicity and subsidence are discussed in terms of the availability of data, state-of-the-art analytical techniques, historical and technical background and interpretation of current data. Estimates of the impact of these geotechnical factors on the environment in the Imperial Valley, if geothermal development proceeds, are discussed.

  20. Environmental assessment of proposed geothermal well testing in the Tigre Lagoon Oil Field, Vermilion Parish, Louisiana

    Energy Technology Data Exchange (ETDEWEB)

    1976-03-01

    An environmental assessment is made of the proposed testing of two geopressured, geothermal aquifers in central coastal Louisiana. On the basis of an analysis of the environmental setting, subsurface characteristics, and the proposed action, potential environmental impacts are determined and evaluated together with potential conflicts with federal, state, and local programs. (LBS )

  1. Geothermal energy

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This chapter discusses the role of geothermal energy may have on the energy future of the US. The topics discussed in the chapter include historical aspects of geothermal energy, the geothermal resource, hydrothermal fluids, electricity production, district heating, process heating, geopressured brines, technology and costs, hot dry rock, magma, and environmental and siting issues

  2. Environmental overview of geothermal development: the Mono-Long Valley KGRA

    Energy Technology Data Exchange (ETDEWEB)

    Strojan, C.L.; Romney, E.M. (eds.)

    1979-01-01

    Major issues and concerns relating to geothermal development were identified and assessed in seven broad areas: (1) air quality, (2) archaeology and cultural resources, (3) geology, (4) natural ecosystems, (5) noise, (6) socioeconomics, and (7) water quality. Existing data for each of these areas was identified and evaluated to determine if the data can be used to help resolve major issues. Finally, specific areas where additional data are needed to ensure that geothermal development is environmentally acceptable were recommended.

  3. Geothermal direct-heat utilization assistance: Federal assistance program. Quarterly project progress report, October--December 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-02-01

    The report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the first quarter of FY-96. It describes 90 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, equipment and resources. Research activities are summarized on low-temperature resource assessment, geothermal district heating system cost evaluation and silica waste utilization project. Outreach activities include the publication of a geothermal direct use Bulletin, dissemination of information, geothermal library, technical papers and seminars, development of a webpage, and progress monitor reports on geothermal resources and utilization.

  4. Navy Geothermal Plan

    Energy Technology Data Exchange (ETDEWEB)

    1984-12-01

    Domestic geothermal resources with the potential for decreasing fossil fuel use and energy cost exist at a significant number of Navy facilities. The Geothermal Plan is part of the Navy Energy R and D Program that will evaluate Navy sites and provide a technical, economic, and environmental base for subsequent resource use. One purpose of the program will be to provide for the transition of R and D funded exploratory efforts into the resource development phase. Individual Navy geothermal site projects are described as well as the organizational structure and Navy decision network. 2 figs.

  5. Geothermal Direct Use Program Opportunity Notice Projects Lessons Learned Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Lunis, B.C.

    1986-01-01

    The use of geothermal energy for direct-use applications was aided through the development of a number of successful field experiment projects funded on a cost-shared basis by the US Department of Energy, Division of Geothermal Technology. This document provides a summary of the projects administered by the US Department of Energy's Idaho Operations Office and technically monitored through the Idaho National Engineering Laboratory (EG and G Idaho, Inc.). An overview of significant findings and conclusions is provided, as are project descriptions and activities, resource development, design, construction, and operational features. Legal and institutional considerations are also discussed.

  6. Bruneau Known Geothermal Resource Area: an environmental analysis

    Energy Technology Data Exchange (ETDEWEB)

    Spencer, S.G.; Russell, B.F. (eds.)

    1979-09-01

    The Bruneau Known Geothermal Resource Area (KGRA) is part of the Bruneau-Grandview thermal anomaly, the largest geothermal area in the western US. This part of Owyhee County is the driest part of Idaho. The KGRA is associated with the southern boundary fault zone of the Snake River Plain. Thermal water, produced from numerous artesian wells in the region, is supplied from two major aquifers. Ecological concerns include the threatened Astragalus mulfordiae and the numerous birds of prey nesting in the Snake River canyon northwest of the KGRA. Extensive geothermal development may strain the limited health care facilities in the county. Ethnographic information suggests that there is a high probability of prehistoric cultural materials being remnant in the Hot Spring locality.

  7. Environmental Control Project

    International Nuclear Information System (INIS)

    Anon.

    Research carried out in the Environmental Control Project of the 'Centro de Energia Nuclear na Agricultura' (CENA), Piracicaba , Sao Paulo State, Brazil, is described. Such research comprises: determination of ions and metals in waters from different sources; survey of the mineralogical composition of Amazon Basin rivers; development of specific methodologies for the determination of minerals in studies of mineral nutrition of plants and animal nutrition; development of methodologies for the determination of wood sample density, a nuclear method being developed to be applied to field conditions; study of the water flux mouvement within wood. (M.A.) [pt

  8. ADDRESSING ENVIRONMENTAL CHALLENGES UNDER COMPREHENSIVE UTILIZATION OF GEOTHERMAL SALINE WATER RESOURCES IN THE NORTHERN DAGESTAN

    Directory of Open Access Journals (Sweden)

    A. Sh. Ramazanov

    2016-01-01

    Full Text Available Aim. The aim of the study is to develop technologies for processing geothermal brine produced with the extraction of oil as well as to solve environmental problems in the region.Methods. In order to determine the chemical composition and radioactivity of the geothermal water and solid samples, we used atomic absorption and gamma spectrometry. Evaluation of the effectiveness of the technology was made on the basis of experimental studies.Results. In the geothermal water, eight radionuclides were recognized and quantified with the activity of 87 ± 5 Bq / dm3. For the processing of this water to produce lithium carbonate and other components we propose a technological scheme, which provides a step of water purification from radio-nuclides. As a result of aeration and alkalinization, we can observe deactivation and purification of the geothermal water from mechanical impurities, iron ions, hydrogen carbonates and organic substances. Water treatment allows recovering lithium carbonate, magnesite caustic powder and salt from geothermal water. The mother liquors produced during manufacturing operations meet the requirements for the water suitable for waterflooding of oil reservoirs and can be injected for maintaining the reservoir pressure of the deposits.Conclusion. The implementation of the proposed processing technology of mineralized geothermal water produced with the extraction of oil in the Northern Dagestan will contribute to extend the life of the oil fields and improve the environmental problems. It will also allow import substitution in Russia for lithium carbonate and edible salt.

  9. Community Geothermal Technology Program: Silica bronze project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Bianchini, H.

    1989-10-01

    Objective was to incorporate waste silica from the HGP-A geothermal well in Pohoiki with other refractory materials for investment casting of bronze sculpture. The best composition for casting is about 50% silica, 25% red cinders, and 25% brick dust; remaining ingredient is a binder, such as plaster and water.

  10. Geothermal energy: an important but disregarded form of renewable energy; geological situation, projects and economy in Austria

    International Nuclear Information System (INIS)

    Walker-Hertkorn, S.

    2000-05-01

    This study deals with the topic geothermal energy. Although geothermal energy is an important energy sector within the area of the renewable energies, the European policy downgraded this important, promising energy sector in 1999. Normally, geothermal energy cannot be regarded as a renewable energy source because the heat content of the Earth, the gravitational heat, the source heat, frictional heat and the decay of radioactive isotopes in the further process of geologic history will eventually be exhausted. However, we are referring here to many millions of years. At the present time, geothermal energy can thus be regarded as an inexhaustible renewable energy source. This work is focused on the geothermal situation in Austria. For many people, the term 'geothermal energy' is associated with countries such as Iceland, Italy (Larderello) and New Zealand. However, in Austria there are also innovative projects in the geothermal energy sector that only very few people know about. Some of these trend-setting projects are presented here. Regarding the total situation in Austria, the geothermal potential is described specifically for the Calcareous Alpine nappe and the Vienna Basin. Furthermore, the first results concerning successful injection in Upper Austria and up to now unconsidered locations for geothermal energy plants are presented. This work attempts to present the attractiveness of geothermal energy projects to the public, thus emphasizing the importance of discussing it again on the political level. (author)

  11. Hybrid Cooling for Geothermal Power Plants: Final ARRA Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Bharathan, D.

    2013-06-01

    Many binary-cycle geothermal plants use air as the heat rejection medium. Usually this is accomplished by using an air-cooled condenser (ACC) system to condense the vapor of the working fluid in the cycle. Many air-cooled plants suffer a loss of production capacity of up to 50% during times of high ambient temperatures. Use of limited amounts of water to supplement the performance of ACCs is investigated. Deluge cooling is found to be one of the least-cost options. Limiting the use of water in such an application to less than one thousand operating hours per year can boost plant output during critical high-demand periods while minimizing water use in binary-cycle geothermal power plants.

  12. Geothermal in transition

    International Nuclear Information System (INIS)

    Anderson, J.L.

    1991-01-01

    This article examines the current market for geothermal projects in the US and overseas. The topics of the article include future capacity needs, upgrading the Coso Geothermal project, the productivity of the Geysers area of Northern California, the future of geothermal, and new projects at Soda Lake, Carson Basin, Unalaska Island, and the Puna Geothermal Venture in Hilo, Hawaii

  13. Comprehensive Summary and Analysis of Oral and Written Scoping Comments on the Hawaii Geothermal Project EIS (DOE Review Draft)

    Energy Technology Data Exchange (ETDEWEB)

    None

    1992-09-18

    This report contains summaries of the oral and written comments received during the scoping process for the Hawaii Geothermal Project (HGP) Environmental Impact Statement (EIS). Oral comments were presented during public scoping meetings; written comments were solicited at the public scoping meetings and in the ''Advance Notice of Intent'' and ''Notice of Intent'' (published in the ''Federal Register'') to prepare the HGP EIS. This comprehensive summary of scoping inputs provides an overview of the issues that have been suggested for inclusion in the HGP EIS.

  14. Mountain home known geothermal resource area: an environmental analysis

    Energy Technology Data Exchange (ETDEWEB)

    Spencer, S.G.; Russell, B.F. (eds.)

    1979-09-01

    The Mountain Home KGRA encompasses an area of 3853 hectares (ha) at the foot of the Mount Bennett Hills in Elmore County, Idaho. The site is associated with an arid climate and high winds that generate an acute dust problem. The KGRA lies adjacent to the northwest-southeast trending fault zone that reflects the northern boundary of the western Snake River Plain graben. Data indicate that a careful analysis of the subsidence potential is needed prior to extensive geothermal development. Surface water resources are confined to several small creeks. Lands are utilized for irrigated farmlands and rangeland for livestock. There are no apparent soil limitations to geothermal development. Sage grouse and mule deer are the major species of concern. The potential of locating significant heritage resources other than the Oregon Trail or the bathhouse debris appears to be relatively slight.

  15. Crane Creek known geothermal resource area: an environmental analysis

    Energy Technology Data Exchange (ETDEWEB)

    Spencer, S.G.; Russell, B.F. (eds.)

    1979-09-01

    The Crane Creek known geothermal resource area (KGRA) is located in Washington County, in southwestern Idaho. Estimated hydrothermal resource temperatures for the region are 166/sup 0/C (Na-K-Ca) and 176/sup 0/C (quartz). The KGRA is situated along the west side of the north-south trending western Idaho Fault Zone. Historic seismicity data for the region identify earthquake activity within 50 km. The hot springs surface along the margin of a siliceous sinter terrace or in adjacent sediments. Approximately 75% of the KGRA is underlain by shallow, stony soils on steep slopes indicating topographic and drainage limitations to geothermal development. Species of concern include sage grouse, antelope, and mule deer. There is a high probability of finding significant prehistoric cultural resources within the proposed area of development.

  16. Castle Creek known geothermal resource area: an environmental analysis

    Energy Technology Data Exchange (ETDEWEB)

    Spencer, S.G.; Russell, B.F. (eds.)

    1979-09-01

    The Castle Creek known geothermal resource area (KGRA) is part of the large Bruneau-Grand View thermal anomaly in southwestern Idaho. The KGRA is located in the driest area of Idaho and annual precipitation averages 230 mm. The potential of subsidence and slope failure is high in sediments of the Glenns Ferry Formation and Idaho Group found in the KGRA. A major concern is the potential impact of geothermal development on the Snake River Birds of Prey Natural Area which overlaps the KGRA. Any significant economic growth in Owyhee County may strain the ability of the limited health facilities in the county. The Idaho Archaeological survey has located 46 archaeological sites within the KGRA.

  17. Vulcan Hot Springs known geothermal resource area: an environmental analysis

    Energy Technology Data Exchange (ETDEWEB)

    Spencer, S.G.; Russell, B.F. (eds.)

    1979-09-01

    The Vulcan Hot Springs known geothermal resource area (KGRA) is one of the more remote KGRAs in Idaho. The chemistry of Vulcan Hot Springs indicates a subsurface resource temperature of 147/sup 0/C, which may be high enough for power generation. An analysis of the limited data available on climate, meteorology, and air quality indicates few geothermal development concerns in these areas. The KGRA is located on the edge of the Idaho Batholith on a north-trending lineament which may be a factor in the presence of the hot springs. An occasional earthquake of magnitude 7 or greater may be expected in the region. Subsidence or elevation as a result of geothermal development in the KGRA do not appear to be of concern. Fragile granitic soils on steep slopes in the KGRA are unstable and may restrict development. The South fork of the Salmon River, the primary stream in the region, is an important salmon spawning grounds. Stolle Meadows, on the edge of the KGRA, is used as a wintering and calving area for elk, and access to the area is limited during this period. Socioeconomic and demographic surveys indicate that facilities and services will probably not be significantly impacted by development. Known heritage resources in the KGRA include two sites and the potential for additional cultural sites is significant.

  18. El Paso County Geothermal Project at Fort Bliss. Final Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Lear, Jon [Ruby Mountain Inc., Salt Lake City, UT (United State); Bennett, Carlon [Ruby Mountain Inc., Salt Lake City, UT (United State); Lear, Dan [Ruby Mountain Inc., Salt Lake City, UT (United State); Jones, Phil L. [Ruby Mountain Inc., Salt Lake City, UT (United State); Burdge, Mark [Evergreen Clean Energy Management, Provo, UT (United States); Barker, Ben [Evergreen Clean Energy Management, Provo, UT (United States); Segall, Marylin [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Moore, Joseph [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Nash, Gregory [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Jones, Clay [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Simmons, Stuart [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Taylor, Nancy [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.

    2016-02-01

    The El Paso County Geothermal Project at Fort Bliss was an effort to determine the scale and scope of geothermal resources previously identified on Fort Bliss’ McGregor Range in southern Otero County, New Mexico. The project was funded with a $5,000,000 grant to El Paso County from the U.S. Department of Energy (DOE) as part of the American Recovery and Reinvestment Act of 2009 and a $4,812,500 match provided by private sector partners. The project was administered through the DOE Golden Field Office to awardee El Paso County. The primary subcontractor to El Paso County and project Principal Investigator - Ruby Mountain Inc. (RMI) of Salt Lake City, Utah - assembled the project team consisting of Evergreen Clean Energy Management (ECEM) of Provo, Utah, and the Energy & Geoscience Institute at the University of Utah (EGI) in Salt Lake City, UT to complete the final phases of the project. The project formally began in May of 2010 and consisted of two preliminary phases of data collection and evaluation which culminated in the identification of a drilling site for a Resource Confirmation Well on McGregor Range. Well RMI 56-5 was drilled May and June 2013 to a depth of 3,030 ft. below ground level. A string of slotted 7 inch casing was set in 8.75 inch hole on bottom fill at 3,017 ft. to complete the well. The well was drilled using a technique called flooded reverse circulation, which is most common in mineral exploration. This technique produced an exceptionally large and complete cuttings record. An exciting development at the conclusion of drilling was the suspected discovery of a formation that has proven to be of exceptionally high permeability in three desalinization wells six miles to the south. Following drilling and preliminary testing and analysis, the project team has determined that the McGregor Range thermal anomaly is large and can probably support development in the tens of megawatts.

  19. Energy performance strategies for the large scale introduction of geothermal energy in residential and industrial buildings: The GEO.POWER project

    International Nuclear Information System (INIS)

    Giambastiani, B.M.S.; Tinti, F.; Mendrinos, D.; Mastrocicco, M.

    2014-01-01

    Use of shallow geothermal energy, in terms of ground coupled heat pumps (GCHP) for heating and cooling purposes, is an environmentally-friendly and cost-effective alternative with potential to replace fossil fuels and help mitigate global warming. Focusing on the recent results of the GEO.POWER project, this paper aims at examining the energy performance strategies and the future regional and national financial instruments for large scale introduction of geothermal energy and GCHP systems in both residential and industrial buildings. After a transferability assessment to evaluate the reproducibility of some outstanding examples of systems currently existing in Europe for the utilisation of shallow geothermal energy, a set of regulatory, economic and technical actions is proposed to encourage the GCHP market development and support geothermal energy investments in the frame of the existing European normative platforms. This analysis shows that many European markets are changing from a new GCHP market to growth market. However some interventions are still required, such as incentives, regulatory framework, certification schemes and training activities in order to accelerate the market uptake and achieve the main European energy and climate targets. - Highlights: • Potentiality of geothermal applications for heating and cooling in buildings. • Description of the GEO.POWER project and its results. • Local strategies for the large scale introduction of GCHPs

  20. Phase 2 Reese River Geothermal Project Slim Well 56-4 Drilling and Testing

    Energy Technology Data Exchange (ETDEWEB)

    Henkle, William R.; Ronne, Joel

    2008-06-15

    This report covers the drilling and testing of the slim well 56-4 at the Reese River Geothermal Project in Lander County, Nevada. This well was partially funded through a GRED III Cooperative Funding Agreement # DE-FC36-04GO14344, from USDOE.

  1. Heat Mining or Replenishable Geothermal Energy? A Project for Advanced-Level Physics Students

    Science.gov (United States)

    Dugdale, Pam

    2014-01-01

    There is growing interest in the use of low enthalpy geothermal (LEG) energy schemes, whereby heated water is extracted from sandstone aquifers for civic heating projects. While prevalent in countries with volcanic activity, a recently proposed scheme for Manchester offered the perfect opportunity to engage students in the viability of this form…

  2. 76 FR 21329 - Humboldt-Toiyabe National Forest; Nevada; Environmental Impact Statement for Geothermal Leasing...

    Science.gov (United States)

    2011-04-15

    ... at 1340 Financial Blvd, Reno, NV 89502, is a cooperating agency for this NEPA analysis. Responsible... Impact Statement for Geothermal Leasing on the Humboldt-Toiyabe National Forest AGENCY: Forest Service, USDA. ACTION: Notice of Intent to prepare an environmental impact statement. SUMMARY: The Humboldt...

  3. Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Cannon, S.D.; Finch, S.M.

    1992-10-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The independent Technical Steering Panel (TSP) provides technical direction. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates):Source Terms, Environmental Transport, Environmental Monitoring Data, Demography, Food Consumption, and Agriculture, and Environmental Pathways and Dose Estimates

  4. NEDO geothermal energy subcommittee. 18th project report meeting; NEDO chinetsu bunkakai. Dai 18 kai jigyo hokokukai

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-09-01

    Reporting on geothermal energy-related efforts, Taro Yamayasu, a NEDO (New Energy and Industrial Technology Development Organization) director, explains the promotion of researches on geothermal energy exploitation, researches on small and medium scale geothermal binary power system utilization, researches on geothermal exploration technology verification, and joint researches on small scale geothermal exploration on remote islands. Achievement reports are delivered concerning geothermal survey technology verification involving the development of reservoir fluctuation probing technology, deep-seated geothermal resources survey, and international joint projects. Concerning the research cooperation promotion project, a joint research program is reported involving a comprehensive geothermal resources analysis system for a remote island in the eastern part of Indonesia. In relation with the development of thermal water power plants, reports are delivered on the development of a 10MW class demonstration plant, development of technologies (study of elements) for a hot dry rock power system, development of a hole bottom data detection system for drilling in thermal water, and the development of deep-seated geothermal resources sampling technologies. (NEDO)

  5. Hawaii Geothermal Project annotated bibliography: Biological resources of the geothermal subzones, the transmission corridors and the Puna District, Island of Hawaii

    Energy Technology Data Exchange (ETDEWEB)

    Miller, S.E.; Burgett, J.M. [Fish and Wildlife Service, Honolulu, HI (United States). Pacific Islands Office

    1993-10-01

    Task 1 of the Hawaii Geothermal Project Interagency Agreement between the Fish and Wildlife Service and the Department of Energy-Oak Ridge National Laboratory (DOE) includes an annotated bibliography of published and unpublished documents that cover biological issues related to the lowland rain forest in Puna, adjacent areas, transmission corridors, and in the proposed Hawaii Geothermal Project (HGP). The 51 documents reviewed in this report cover the main body of biological information for these projects. The full table of contents and bibliography for each document is included along with two copies (as requested in the Interagency Agreement) of the biological sections of each document. The documents are reviewed in five main categories: (1) geothermal subzones (29 documents); (2) transmission cable routes (8 documents); (3) commercial satellite launching facility (Spaceport; 1 document); (4) manganese nodule processing facility (2 documents); (5) water resource development (1 document); and (6) ecosystem stability and introduced species (11 documents).

  6. Soil as natural heat resource for very shallow geothermal application: laboratory and test site updates from ITER Project

    Science.gov (United States)

    Di Sipio, Eloisa; Bertermann, David

    2017-04-01

    Nowadays renewable energy resources for heating/cooling residential and tertiary buildings and agricultural greenhouses are becoming increasingly important. In this framework, a possible, natural and valid alternative for thermal energy supply is represented by soils. In fact, since 1980 soils have been studied and used also as heat reservoir in geothermal applications, acting as a heat source (in winter) or sink (in summer) coupled mainly with heat pumps. Therefore, the knowledge of soil thermal properties and of heat and mass transfer in the soils plays an important role in modeling the performance, reliability and environmental impact in the short and long term of engineering applications. However, the soil thermal behavior varies with soil physical characteristics such as soil texture and water content. The available data are often scattered and incomplete for geothermal applications, especially very shallow geothermal systems (up to 10 m depths), so it is worthy of interest a better comprehension of how the different soil typologies (i.e. sand, loamy sand...) affect and are affected by the heat transfer exchange with very shallow geothermal installations (i.e. horizontal collector systems and special forms). Taking into consideration these premises, the ITER Project (Improving Thermal Efficiency of horizontal ground heat exchangers, http://iter-geo.eu/), funded by European Union, is here presented. An overview of physical-thermal properties variations under different moisture and load conditions for different mixtures of natural material is shown, based on laboratory and field test data. The test site, located in Eltersdorf, near Erlangen (Germany), consists of 5 trenches, filled in each with a different material, where 5 helix have been installed in an horizontal way instead of the traditional vertical option.

  7. Geothermal probabilistic cost study

    Energy Technology Data Exchange (ETDEWEB)

    Orren, L.H.; Ziman, G.M.; Jones, S.C.; Lee, T.K.; Noll, R.; Wilde, L.; Sadanand, V.

    1981-08-01

    A tool is presented to quantify the risks of geothermal projects, the Geothermal Probabilistic Cost Model (GPCM). The GPCM model is used to evaluate a geothermal reservoir for a binary-cycle electric plant at Heber, California. Three institutional aspects of the geothermal risk which can shift the risk among different agents are analyzed. The leasing of geothermal land, contracting between the producer and the user of the geothermal heat, and insurance against faulty performance are examined. (MHR)

  8. Advanced Low Temperature Geothermal Power Cycles (The ENTIV Organic Project) Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Mugerwa, Michael [Technip USA, Inc., Claremont, CA (United States)

    2015-11-18

    Feasibility study of advanced low temperature thermal power cycles for the Entiv Organic Project. Study evaluates amonia-water mixed working fluid energy conversion processes developed and licensed under Kalex in comparison with Kalina cycles. Both cycles are developed using low temperature thermal resource from the Lower Klamath Lake Geothermal Area. An economic feasibility evaluation was conducted for a pilot plant which was deemed unfeasible by the Project Sponsor (Entiv).

  9. Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Finch, S.M.; McMakin, A.H.

    1991-04-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that populations could have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Pacific Northwest Laboratory (PNL) under the direction of an independent Technical Steering Panel (TSP). The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from released to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demographics, agriculture, food habits; and, environmental pathways and dose estimates

  10. Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Finch, S.M.; McMakin, A.H.

    1992-06-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Battelle Pacific Northwest Laboratories under contract with the Centers for Disease Control. The independent Technical Steering Panel (TSP) provides technical direction. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demography, food consumption, and agriculture; environmental pathways and dose estimates

  11. Environmentally Responsible Aviation Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Created in 2009 as part of NASA's Aeronautics Research Mission Directorate's Integrated Systems Research Program, the Environmentally Responsible Aviation...

  12. Thermal properties variations in unconsolidated material for very shallow geothermal application (ITER project)

    Science.gov (United States)

    Sipio, Eloisa Di; Bertermann, David

    2018-04-01

    In engineering, agricultural and meteorological project design, sediment thermal properties are highly important parameters, and thermal conductivity plays a fundamental role when dimensioning ground heat exchangers, especially in very shallow geothermal systems. Herein, the first 2 m of depth from surface is of critical importance. However, the heat transfer determination in unconsolidated material is difficult to estimate, as it depends on several factors, including particle size, bulk density, water content, mineralogy composition and ground temperature. The performance of a very shallow geothermal system, as a horizontal collector or heat basket, is strongly correlated to the type of sediment at disposal and rapidly decreases in the case of dry-unsaturated conditions. The available experimental data are often scattered, incomplete and do not fully support thermo-active ground structure modeling. The ITER project, funded by the European Union, contributes to a better knowledge of the relationship between thermal conductivity and water content, required for understanding the very shallow geothermal systems behaviour in saturated and unsaturated conditions. So as to enhance the performance of horizontal geothermal heat exchangers, thermally enhanced backfilling material were tested in the laboratory, and an overview of physical-thermal properties variations under several moisture and load conditions for different mixtures of natural material was here presented.

  13. Environmental Impacts of a Multi-Borehole Geothermal System: Model Sensitivity Study

    Science.gov (United States)

    Krol, M.; Daemi, N.

    2017-12-01

    Problems associated with fossil fuel consumption has increased worldwide interest in discovering and developing sustainable energy systems. One such system is geothermal heating, which uses the constant temperature of the ground to heat or cool buildings. Since geothermal heating offers low maintenance, high heating/cooling comfort, and a low carbon footprint, compared to conventional systems, there has been an increasing trend in equipping large buildings with geothermal heating. However, little is known on the potential environmental impact geothermal heating can have on the subsurface, such as the creation of subsurface thermal plumes or changes in groundwater flow dynamics. In the present study, the environmental impacts of a closed-loop, ground source heat pump (GSHP) system was examined with respect to different system parameters. To do this a three-dimensional model, developed using FEFLOW, was used to examine the thermal plumes resulting from ten years of operation of a vertical closed-loop GSHP system with multiple boreholes. A required thermal load typical of an office building located in Canada was calculated and groundwater flow and heat transport in the geological formation was simulated. Consequently, the resulting thermal plumes were studied and a sensitivity analysis was conducted to determine the effect of different parameters like groundwater flow and soil type on the development and movement of thermal plumes. Since thermal plumes can affect the efficiency of a GSHP system, this study provides insight into important system parameters.

  14. Geothermal energy

    International Nuclear Information System (INIS)

    Laplaige, Ph.; Lemale, J.

    2008-01-01

    Geothermal energy is a renewable energy source which consists in exploiting the heat coming from the Earth. It covers a wide range of techniques and applications which are presented in this article: 1 - the Earth, source of heat: structure of the Earth, geodynamic model and plate tectonics, origin of heat, geothermal gradient and terrestrial heat flux; 2 - geothermal fields and resources; 3 - implementation of geothermal resources: exploration, main characteristic parameters, resource exploitation; 4 - uses of geothermal resources: power generation, thermal uses, space heating and air conditioning heat pumps, district heating, addition of heat pumps; 5 - economical aspects: power generation, heat generation for district heating; 6 - environmental aspects: conditions of implementation, impacts as substitute to fossil fuels; 7 - geothermal energy in France: resources, organisation; 8 - conclusion. (J.S.)

  15. Geothermal direct-heat utilization assistance. Federal Assistance Program quarterly project progress report, April 1--June 30, 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-01

    This report summarizes geothermal technical assistance, R and D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the third quarter of FY98 (April--June, 1998). It describes 231 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with included requests for general information including material for high school and university students, and material on geothermal heat pumps, resource and well data, spacing heating and cooling, greenhouses, aquaculture, equipment, district heating, resorts and spas, industrial applications, snow melting and electric power. Research activities include work on model construction specifications for line shaft submersible pumps and plate heat exchangers, and a comprehensive aquaculture developers package. A brochure on Geothermal Energy in Klamath County was developed for state and local tourism use. Outreach activities include the publication of the Quarterly Bulletin (Vol. 19, No. 2) with articles on research at the Geo-Heat Center, sustainability of geothermal resources, injection well drilling in Boise, ID and a greenhouse project in the Azores. Other outreach activities include dissemination of information mainly through mailings of publications, tours of local geothermal uses, geothermal library acquisitions and use, participation in workshops, short courses and technical meetings by the staff, and progress monitor reports on geothermal activities.

  16. Progress of the LASL dry hot rock geothermal energy project

    Science.gov (United States)

    Smith, M. C.

    1974-01-01

    The possibilities and problems of extracting energy from geothermal reservoirs which do not spontaneously yield useful amounts of steam or hot water are discussed. The system for accomplishing this which is being developed first is a pressurized-water circulation loop intended for use in relatively impermeable hot rock. It will consist of two holes connected through the hot rock by a very large hydraulic fracture and connected at the surface through the primary heat exchanger of an energy utilization system. Preliminary experiments in a hole 2576 ft (0.7852 km) deep, extending about 470 ft (143 m) into the Precambrian basement rock underlying the Jemez Plateau of north-central New Mexico, revealed no unexpected difficulties in drilling or hydraulically fracturing such rock at a temperature of approximately 100 C, and demonstrated a permeability low enough so that it appeared probable that pressurized water could be contained by the basement rock. Similar experiments are in progress in a second hole, now 6701 ft (2.043 km) deep, about 1.5 miles (2.4 km) south of the first one.

  17. Guidebook to Geothermal Finance

    Energy Technology Data Exchange (ETDEWEB)

    Salmon, J. P.; Meurice, J.; Wobus, N.; Stern, F.; Duaime, M.

    2011-03-01

    This guidebook is intended to facilitate further investment in conventional geothermal projects in the United States. It includes a brief primer on geothermal technology and the most relevant policies related to geothermal project development. The trends in geothermal project finance are the focus of this tool, relying heavily on interviews with leaders in the field of geothermal project finance. Using the information provided, developers and investors may innovate in new ways, developing partnerships that match investors' risk tolerance with the capital requirements of geothermal projects in this dynamic and evolving marketplace.

  18. Environmental overview of geopressured-geothermal development: Texas Gulf Coast

    Energy Technology Data Exchange (ETDEWEB)

    Gustavson, T.C.; Kreitler, C.W.

    1979-01-01

    In the summary of the recommended environmental program are: site specific studies, general studies, cost estimates for the program, socioeconomic and demographic research, potential environmental concerns, environmental research, effects of geopressure exploitation, and research plans. The socioeconomic and cultural considerations are impacts on communities. Waste disposal, geologic framework, ground subsidence, and monitoring techniques are discussed. (MHR)

  19. Environmental impact of geothermal power plants in Aydın, Turkey

    Science.gov (United States)

    Yilmaz, Ersel; Ali Kaptan, Mustafa

    2017-10-01

    Geothermal energy is classified as a clean and sustainable energy source, like all industrial activities, geothermal energy power plants (GEPP) technology has also some positive and negative effects on the environment. In this paper are presented by attent not only on environmental impacts of GEPP onto Büyük Menderes River and fresh water sources, which ere used for irrigation of agricultural fields from tousands of years in basin, but also on water quality contents like heavy metals and gases emition due to drilling and electricity producing technology of GEPP's. Aydın province is located in the southwestern part of the region and its city center has around 300000 population. The high geothermal potential of this region became from geographical location, which is held on active tectonic Alpine-Himalaya Orogen belt with active volcanoes and young faults. Since 1980's to 2016 there is about 70.97% (662.75 MW) of installed capacity by according to the Mineral Research and Exploration General Directorate, there are totally 290 well licensed (540 explore licenses and 76 business licenses), and 31 geothermal powerplants purposely installed. Topic is important because of number of GEPP increased rapidly after 2012 to now a days to 36 in whole basin.

  20. Final Progress Report for Project Entitled: Quantum Dot Tracers for Use in Engineered Geothermal Systems

    Energy Technology Data Exchange (ETDEWEB)

    Rose, Peter [Univ. of Utah, Salt Lake City, UT (United States); Bartl, Michael [Univ. of Utah, Salt Lake City, UT (United States); Reimus, Paul [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Williams, Mark [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Mella, Mike [Univ. of Utah, Salt Lake City, UT (United States)

    2015-09-12

    The objective of this project was to develop and demonstrate a new class of tracers that offer great promise for use in characterizing fracture networks in EGS reservoirs. From laboratory synthesis and testing through numerical modeling and field demonstrations, we have demonstrated the amazing versatility and applicability of quantum dot tracers. This report summarizes the results of four years of research into the design, synthesis, and characterization of semiconductor nanocrystals (quantum dots) for use as geothermal tracers.

  1. Mountain Home Geothermal Project: geothermal energy applications in an integrated livestock meat and feed production facility at Mountain Home, Idaho. [Contains glossary

    Energy Technology Data Exchange (ETDEWEB)

    Longyear, A.B.; Brink, W.R.; Fisher, L.A.; Matherson, R.H.; Neilson, J.A.; Sanyal, S.K.

    1979-02-01

    The Mountain Home Geothermal Project is an engineering and economic study of a vertically integrated livestock meat and feed production facility utilizing direct geothermal energy from the KGRA (Known Geothermal Resource Area) southeast of Mountain Home, Idaho. A system of feed production, swine raising, slaughter, potato processing and waste management was selected for study based upon market trends, regional practices, available technology, use of commercial hardware, resource characteristics, thermal cascade and mass flow considerations, and input from the Advisory Board. The complex covers 160 acres; utilizes 115 million Btu per hour (34 megawatts-thermal) of geothermal heat between 300/sup 0/F and 70/sup 0/F; has an installed capital of $35.5 million;produces 150,000 hogs per year, 28 million lbs. of processed potatoes per year, and on the order of 1000 continuous horsepower from methane. The total effluent is 200 gallons per minute (gpm) of irrigation water and 7300 tons per year of saleable high grade fertilizer. The entire facility utilizes 1000 gpm of 350/sup 0/F geothermal water. The economic analysis indicates that the complex should have a payout of owner-invested capital of just over three years. Total debt at 11% per year interest would be paid out in 12 (twelve) years.

  2. Proposal for the further development of the 'Ribeira Grande' agricultural geothermal project

    International Nuclear Information System (INIS)

    Popovski, Kiril; De Medeiros, Jorge Rosa; Rodrigues, Ana Catarina Tavares

    2000-01-01

    Geothermal project Ribeira Grande has been the first trial to introduce the possibilities of direct application of geothermal energy at Azores. As all the first experiences, it's development has been escorted with a list of difficulties and problems, resulting with non proper completion of some systems and installations. However, even not complete, the reached results justified both technically and economically the indigenous resource door for further activities and development. Presented proposal for the second phase of project development consists two very important advantages: 1) Enables development of new demonstration and productive projects, without engaging new import of fuels or other energents; 2) Enables development based on the already existing economy sectors at the islands and makes them more profitable and accommodated to the requests of the national and international market. However, influencing national and international preconditions for the realization of the proposed activities are not very convenient and are requesting a concentrate engagement of the Institute for Innovative Technologies of Azores INOVA during the period of next 5 years. The final success of this engagement shall open very wide possibilities for direct application of geothermal energy development in this isolated EC community, presently mainly orientated towards import both of energy and food. (Authors)

  3. Make-up wells drilling cost in financial model for a geothermal project

    Science.gov (United States)

    Oktaviani Purwaningsih, Fitri; Husnie, Ruly; Afuar, Waldy; Abdurrahman, Gugun

    2017-12-01

    After commissioning of a power plant, geothermal reservoir will encounter pressure decline, which will affect wells productivity. Therefore, further drilling is carried out to enhance steam production. Make-up wells are production wells drilled inside an already confirmed reservoir to maintain steam production in a certain level. Based on Sanyal (2004), geothermal power cost consists of three components, those are capital cost, O&M cost and make-up drilling cost. The make-up drilling cost component is a major part of power cost which will give big influence in a whole economical value of the project. The objective of this paper it to analyse the make-up wells drilling cost component in financial model of a geothermal power project. The research will calculate make-up wells requirements, drilling costs as a function of time and how they influence the financial model and affect the power cost. The best scenario in determining make-up wells strategy in relation with the project financial model would be the result of this research.

  4. How to boost shallow geothermal energy exploitation in the adriatic area: the LEGEND project experience

    International Nuclear Information System (INIS)

    Francesco, Tinti; Annamaria, Pangallo; Martina, Berneschi; Dario, Tosoni; Dušan, Rajver; Simona, Pestotnik; Dalibor, Jovanović; Tomislav, Rudinica; Slavisa, Jelisić; Branko, Zlokapa; Attilio, Raimondi

    2016-01-01

    The evaluation, monitoring and reduction of the heating and cooling consumptions are topics of increasing importance. One promising technology is the geothermal heat pump. Despite its undoubted advantages compared to fossil fuels in terms of RES production, CO_2 reduction and primary energy savings, there are still significant barriers for the creation of sustainable local markets. Many regions present similar conditions in terms of climate, geology, hydrogeology, infrastructure and political conditions. Because of the context-driven nature of shallow geothermal systems, similarities should be taken into account and strategies shared across borders to foster the introduction and exploitation of shallow geothermal energy. Focusing on the results of the LEGEND Project, this paper presents an attempt at creating an interregional strategy for the widespread introduction of geothermal heat pumps in the Adriatic area, which includes EU and non-EU countries. The multi-level approach adopted (a combination of desk studies on the transferability potential, pilot plants across the regions and programs to involve, educate and train stakeholders) allowed to set up the strategy. Therefore, different actions are proposed to stimulate the development of the market, whose interconnection across the Adriatic can accelerate the achievement of the main energy and climate targets for all the countries involved. - Highlights: •The Interregional Adriatic strategy for shallow geothermal energy is presented. •The strategy speeds up renewable energy introduction in border countries. •Geological, climate, market and political similarities must be taken into account. •The preparatory action is the creation of trained market and supply chain.

  5. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance for Geothermal Resource Evaluation Projects

    Energy Technology Data Exchange (ETDEWEB)

    Robert P. Breckenridge; Thomas R. Wood; Joel Renner

    2010-09-01

    The purpose of this document is to report on the evaluation of geothermal resource potential on and around three different United States (U. S.) Air Force Bases (AFBs): Nellis AFB and Air Force Range (AFR) in the State of Nevada (see maps 1 and 5), Holloman AFB in the State of New Mexico (see map 2), and Mountain Home AFB in the State of Idaho (see map 3). All three sites are located in semi-arid parts of the western U. S. The U. S. Air Force, through its Air Combat Command (ACC) located at Langley AFB in the State of Virginia, asked the Federal Energy Management Program (FEMP) for technical assistance to conduct technical and feasibility evaluations for the potential to identify viable geothermal resources on or around three different AFBs. Idaho National Laboratory (INL) is supporting FEMP in providing technical assistance to a number of different Federal Agencies. For this report, the three different AFBs are considered one project because they all deal with potential geothermal resource evaluations. The three AFBs will be evaluated primarily for their opportunity to develop a geothermal resource of high enough quality grade (i.e., temperature, productivity, depth, etc.) to consider the possibility for generation of electricity through a power plant. Secondarily, if the resource for the three AFBs is found to be not sufficient enough for electricity generation, then they will be described in enough detail to allow the base energy managers to evaluate if the resource is suitable for direct heating or cooling. Site visits and meetings by INL personnel with the staff at each AFB were held in late FY-2009 and FY-2010. This report provides a technical evaluation of the opportunities and challenges for developing geothermal resources on and around the AFBs. An extensive amount of literature and geographic information was evaluated as a part of this assessment. Resource potential maps were developed for each of the AFBs.

  6. Geothermal energy

    International Nuclear Information System (INIS)

    Kappelmeyer, O.

    1991-01-01

    Geothermal energy is the natural heat of the earth. It represents an inexhaustible source of energy. In many countries, which are mostly located within the geothermal belts of the world, geothermal energy is being used since many decades for electricity generation and direct heating applications comprising municipal, industrial and agricultural heating. Outside the geothermal anomalous volcanic regions, hot ground water from deep rock formations at temperatures above 70 o C is used for process heat and space heating. Low prices for gas and oil hinder the development of geothermal plants in areas outside positive geothermal anomalies; the cost of drilling to reach depths, where temperatures are above 50 o C to 70 o C, is high. The necessary total investment per MW th installed capacity is in the order of 5 Mio- DM/MW th (3 Mio $/MW th ). Experience shows, that an economic break even with oil is reached at an oil price of 30$ per barrel or if an adequate bonus for the clean, environmentally compatible production of geothermal heat is granted. Worldwide the installed electric capacity of geothermal power plants is approximately 6 000 MW e . About 15 000 MW th of thermal capacity is being extracted for process heat and space heat. The importance of the terrestrial heat as an energy resource would be substantially increased, if the heat, stored in the hot crystalline basement could be extracted at economical production costs. Geothermal energy is a competitive energy source in areas with high geothermal gradients (relative low cost for drilling) and would be competitive in areas with normal geothermal gradients, if a fair compensation for environmental implications from fossil and nuclear power production would be granted. (author) 2 figs., 1 tab., 6 refs

  7. Life Cycle Water Consumption and Water Resource Assessment for Utility-Scale Geothermal Systems: An In-Depth Analysis of Historical and Forthcoming EGS Projects

    Energy Technology Data Exchange (ETDEWEB)

    Clark, Corrie E. [Argonne National Lab. (ANL), Argonne, IL (United States); Harto, Christopher B. [Argonne National Lab. (ANL), Argonne, IL (United States); Schroeder, Jenna N. [Argonne National Lab. (ANL), Argonne, IL (United States); Martino, Louis E. [Argonne National Lab. (ANL), Argonne, IL (United States); Horner, Robert M. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2013-08-01

    This report is the third in a series of reports sponsored by the U.S. Department of Energy Geothermal Technologies Program in which a range of water-related issues surrounding geothermal power production are evaluated. The first report made an initial attempt at quantifying the life cycle fresh water requirements of geothermal power-generating systems and explored operational and environmental concerns related to the geochemical composition of geothermal fluids. The initial analysis of life cycle fresh water consumption of geothermal power-generating systems identified that operational water requirements consumed the vast majority of water across the life cycle. However, it relied upon limited operational water consumption data and did not account for belowground operational losses for enhanced geothermal systems (EGSs). A second report presented an initial assessment of fresh water demand for future growth in utility-scale geothermal power generation. The current analysis builds upon this work to improve life cycle fresh water consumption estimates and incorporates regional water availability into the resource assessment to improve the identification of areas where future growth in geothermal electricity generation may encounter water challenges. This report is divided into nine chapters. Chapter 1 gives the background of the project and its purpose, which is to assess the water consumption of geothermal technologies and identify areas where water availability may present a challenge to utility-scale geothermal development. Water consumption refers to the water that is withdrawn from a resource such as a river, lake, or nongeothermal aquifer that is not returned to that resource. The geothermal electricity generation technologies evaluated in this study include conventional hydrothermal flash and binary systems, as well as EGSs that rely on engineering a productive reservoir where heat exists, but where water availability or permeability may be limited. Chapter 2

  8. Desert Peak East Enhanced Geothermal Systems (EGS) Project

    Energy Technology Data Exchange (ETDEWEB)

    Zemach, Ezra [Ormat Technologies Inc., Reno, NV (United States); Drakos, Peter [Ormat Technologies Inc., Reno, NV (United States); Spielman, Paul [Ormat Technologies Inc., Reno, NV (United States); Akerley, John [Ormat Technologies Inc., Reno, NV (United States)

    2013-09-30

    This manuscript is a draft to replaced with a final version at a later date TBD. A summary of activities pertaining to the Desert Peak EGS project including the planning and resulting stimulation activities.

  9. Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    McMakin, A.H.; Cannon, S.D.; Finch, S.M.

    1992-07-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The TSP consists of experts in environmental pathways, epidemiology, surface-water transport, ground-water transport, statistics, demography, agriculture, meteorology, nuclear engineering, radiation dosimetry, and cultural anthropology. Included are appointed technical members representing the states of Oregon, Washington, and Idaho, a representative of Native American tribes, and an individual representing the public. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates): Source terms, environmental transport, environmental monitoring data, demography, food consumption, and agriculture, and environmental pathways and dose estimates. Progress is discussed

  10. Potential effects of the Hawaii Geothermal Project on ground-water resources on the island of Hawaii

    Science.gov (United States)

    Sorey, M.L.; Colvard, E.M.

    1994-01-01

    In 1990, the State of Hawaii proposed the Hawaii Geothermal Project for the development of as much as 500 MW of electric power from the geothermal system in the East Rift Zone of Kilauea Volcano. This report uses data from 31 wells and 8 springs to describe the properties of the ground-water system in and adjacent to the East Rift Zone. Potential effects of this project on ground-water resources are also discussed. Data show differences in ground-water chemistry and heads within the study area that appear to be related to mixing of waters of different origins and ground-water impoundment by volcanic dikes. East of Pahoa, the ground-water system within the rift is highly transmissive and receives abundant recharge from precipitation; therefore, the pumping of freshwater to support geothermal development in that part of the rift zone would have a minimal effect on ground-water levels. To the southwest of Pahoa, dike impoundment reduces the transmissivity of the ground-water system to such an extent that wells might not be capable of supplying sufficient fresh water to support geothermal operations. Contamination of ground-water resources by accidental release of geothermal fluids into shallow aquifers is possible because of corrosive conditions in the geothermal wells, potential well blowouts, and high ground-water velocities in parts of the region. Hydrologic monitoring of water level, temperature, and chemistry in observation wells should continue throughout development of geothermal resources for the Hawaii Geothermal Project for early detection of leakage and migration of geothermal fluids within the groundwater system.

  11. Probability-of-success studies for geothermal projects: from subsurface data to geological risk analysis

    Science.gov (United States)

    Schumacher, Sandra; Pierau, Roberto; Wirth, Wolfgang

    2017-04-01

    In recent years, the development of geothermal plants in Germany has increased significantly due to a favorable political setting and resulting financial incentives. However, most projects are developed by local communities or private investors, which cannot afford a project to fail. To cover the risk of total loss if the geothermal well should not provide the energy output necessary for an economically viable project, investors try to procure insurances for this worst case scenario. In order to issue such insurances, the insurance companies insist on so called probability-of-success studies (POS studies), in which the geological risk for not achieving the necessary temperatures and/or flow rates for an economically successful project is quantified. Quantifying the probability of reaching a minimum temperature, which has to be defined by the project investors, is relatively straight forward as subsurface temperatures in Germany are comparatively well known due tens of thousands of hydrocarbon wells. Moreover, for the German Molasse Basin a method to characterize the hydraulic potential of a site based on pump test analysis has been developed and refined in recent years. However, to quantify the probability of reaching a given flow rate with a given drawdown is much more challenging in areas where pump test data are generally not available (e.g. the North German Basin). Therefore, a new method based on log and core derived porosity and permeability data was developed to quantify the geological risk of reaching a determined flow rate in such areas. We present both methods for POS studies and show how subsurface data such as pump tests or log and core measurements can be used to predict the chances of a potential geothermal project from a geological point of view.

  12. Geothermal and Trigeneration Systems as Innovative and EnvironmentallyFriendly Solutions for Telecommunication Plant Cooling

    Directory of Open Access Journals (Sweden)

    Paolo Trotta

    2016-12-01

    Full Text Available The paper deals with a model-based analysis of innovative cooling systems, to be deployed in telecommunication (TLC plants in consideration of their size, geographical location and typology (e.g. central Offices or data-centers. Environmentally friendly systems, such as geothermal heat pumps and trigeneration plants, were considered. The trade-off between the investment and operating costs was first analyzed, followed by a comparative evaluation of economic savings achievable via each candidate solution with respect to reference benchmarks, here represented by traditional air-water heat pump and conventional interaction with electrical grid. In this way, a preliminary macroscopic assessment of the best solutions was accomplished, according to the different scenarios (i.e. small or big TLC plant under investigation. A more detailed analysis, concerning the comparison between traditional and geothermal systems, was specifically carried out to evaluate savings as a function of the external temperature and, consequently, of geographical location.

  13. Calculations of environmental benefits from using geothermal energy must include the rebound effect

    DEFF Research Database (Denmark)

    Atlason, Reynir Smari; Unnthorsson, Runar

    2017-01-01

    and energy production patterns are simulated using data from countries with similar environmental conditions but do not use geothermal or hydropower to the same extent as Iceland. Because of the rapid shift towards renewable energy and exclusion of external energy provision, the country is considered......When considering the environmental benefits from converting to renewable energy sources, the rebound effect is often omitted. In this study, the aim is to investigate greenhouse gas emission reduction inclusive of the rebound effect. We use Iceland as a case study where alternative consumption...

  14. Environmental Assessment: Geothermal Energy Geopressure Subprogram. Gulf Coast Well Testing Activity, Frio Formation, Texas and Louisiana

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-02-01

    This Environmental Assessment (EA) has been prepared to provide the environmental input into the Division of Geothermal Energy's decisions to expand the geothermal well testing activities to include sites in the Frio Formation of Texas and Louisiana. It is proposed that drilling rigs be leased before they are removed from sites in the formation where drilling for gas or oil exploration has been unsuccessful and that the rigs be used to complete the drilling into the geopressured zone for resource exploration. This EA addresses, on a regional basis, the expected activities, affected environment, and the possible impacts in a broad sense as they apply to the Gulf Coast well testing activity of the Geothermal Energy Geopressure Subprogram of the Department of Energy. Along the Texas and Louisiana Gulf Coast (Plate 1 and Overlay, Atlas) water at high temperatures and high pressures is trapped within Gulf basin sediments. The water is confined within or below essentially impermeable shale sequences and carries most or all of the overburden pressure. Such zones are referred to as geopressured strata. These fluids and sediments are heated to abnormally high temperatures (up to 260 C) and may provide potential reservoirs for economical production of geothermal energy. The obvious need in resource development is to assess the resource. Ongoing studies to define large-sand-volume reservoirs will ultimately define optimum sites for drilling special large diameter wells to perform large volume flow production tests. in the interim, existing well tests need to be made to help define and assess the resource.

  15. Potential effects of the Hawaii geothermal project on ground-water resources on the Island of Hawaii

    Energy Technology Data Exchange (ETDEWEB)

    Sorey, M.L.; Colvard, E.M.

    1994-07-01

    This report provides data and information on the quantity and quality of ground-water resources in and adjacent to proposed geothermal development areas on the Island of Hawaii Geothermal project for the development of as much as 500 MW of electric power from the geothermal system in the East Rift Zone of Kilauea Volcano. Data presented for about 31 wells and 8 springs describe the chemical, thermal, and hydraulic properties of the ground-water system in and adjacent to the East Rift Zone. On the basis of this information, potential effects of this geothermal development on drawdown of ground-water levels and contamination of ground-water resources are discussed. Significant differences in ground-water levels and in the salinity and temperature of ground water within the study area appear to be related to mixing of waters from different sources and varying degrees of ground-water impoundment by volcanic dikes. Near Pahoa and to the east, the ground-water system within the rift is highly transmissive and receives abundant recharge from precipitation; therefore, the relatively modest requirements for fresh water to support geothermal development in that part of the east rift zone would result in minimal effects on ground-water levels in and adjacent to the rift. To the southwest of Pahoa, dike impoundment reduces the transmissivity of the ground-water system to such an extent that wells might not be capable of supplying fresh water at rates sufficient to support geothermal operations. Water would have to be transported to such developments from supply systems located outside the rift or farther downrift. Contaminant migration resulting from well accidents could be rapid because of relatively high ground-water velocities in parts of the region. Hydrologic monitoring of observation wells needs to be continued throughout development of geothermal resources for the Hawaii Geothermal Project to enable the early detection of leakage and migration of geothermal fluids.

  16. Geothermal energy technology

    Energy Technology Data Exchange (ETDEWEB)

    1977-01-01

    Geothermal energy research and development by the Sunshine Project is subdivided into five major categories: exploration and exploitation technology, hot-water power generation technology, volcanic power generation technology, environmental conservation and multi-use technology, and equipment materials research. The programs are being carried out by various National Research Institutes, universities, and private industry. During 1976 and 1977, studies were made of the extent of resources, reservoir structure, ground water movement, and neotectonics at the Onikobe and Hachimantai geothermal fields. Studies to be performed in the near future include the use of new prospecting methods, including artificial magnetotellurics, heat balance calculation, brightspot techniques, and remote sensing, as well as laboratory studies of the physical, mechanical, and chemical properties of rock. Studies are continuing in the areas of ore formation in geothermal environments, hot-dry-rock drilling and fracturing, large scale prospecting technology, high temperature-pressure drilling muds and well cements, and arsenic removal techniques.

  17. Summary Report, Southwest Regional Geothermal Operations Research Program: First project year, June 1977-August 1978

    Energy Technology Data Exchange (ETDEWEB)

    Meyer, Richard T.; Davidson, Ray

    1978-12-01

    The overall objectives of the first year project were as follows: (1) to develop realistic but aggressive scenarios with certainty factors for the development of each identified geothermal resource area in Arizona, Colorado, Nevada, New Mexico, and Utah; (2) to delineate the public actions, together with their schedules, required for the scenarios to materialize; and (3) to develop a computer-based data storage and retrieval system (i.e. a Regional Program Progress Monitor) of the level of a preliminary working model, which is capable of displaying program approach but is not loaded with all available data. In addition, each sponsor had supplementary objectives aligned to its own programmatic goals. DOE sought to develop expertise and programs within the appropriate state agencies upon which future DOE development and commercialization activities could be structured. FCRC sought to promote the utilization of geothermal energy throughout the five-state region for purposes of expanded economic development, increased employment, and higher citizen incomes. The goals of the five states varied from state to state, but generally included the following: development of alternative energy sources to replace dwindling supplies of oil and natural gas; economic and industrial development in rural areas; encouragement of industry and utility development of geothermal energy for electrical power generation; demonstration of the practical applications of energy research and development; and close interaction with business and industry for the commercialization of both electric and direct thermal applications.

  18. Energetic, exergetic, economic and environmental evaluations of geothermal district heating systems: An application

    International Nuclear Information System (INIS)

    Keçebaş, Ali

    2013-01-01

    Highlights: ► Applying exergy, economic, environment and sustainability analyses to the GDHSs. ► Assessing energy and exergy efficiencies, economic and environmental impacts. ► Calculating the energy and exergy efficiencies of 34.86% and 48.78%, respectively. ► Proposing GDHSs as the most economic heating system. ► Providing a significant contribution towards reducing the emissions of air pollution. - Abstract: This study deals with an energetic and exergetic analysis as well as economic and environmental evaluations of Afyon geothermal district heating system (AGDHS) in Afyon, Turkey. In the analysis, actual system data are used to assess the district heating system performance, energy and exergy efficiencies, specific exergy index, exergetic improvement potential and exergy losses. And, for economic and environmental evaluations, actual data are obtained from the Technical Departments. The energy and exergy flow diagrams are clearly drawn to illustrate how much destructions/losses take place in addition to the inputs and outputs. For system performance analysis and improvement, both energy and exergy efficiencies of the overall AGDHS are determined to be 34.86% and 48.78%, respectively. The efficiency improvements in heat and power systems can help achieving energy security in an environmentally acceptable way by reducing the emissions that might otherwise occur. Present application has shown that in Turkey, geothermal energy is much cheaper than the other energy sources, like fossil fuels, and makes a significant contribution towards reducing the emissions of air pollution.

  19. Low-Temperature Projects of the Department of Energy's Geothermal Technologies Program: Evaluation and Lessons Learned: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Williams, Tom; Snyder, Neil; Gosnold, Will

    2016-12-01

    This paper discusses opportunities and challenges related to the technical and economic feasibility of developing power generation from geothermal resources at temperatures of 150 degrees C and lower. Insights from projects funded by the U.S. Department of Energy (DOE), Geothermal Technologies Office inform these discussions and provide the basis for some lessons learned to help guide decisions by DOE and the industry in further developing this resource. The technical basis for low-temperature geothermal energy is well established and the systems can be economic today in certain situations. However, these applications are far from a 'plug and play' product; successful development today requires a good knowledge of geothermal system design and operation.

  20. Low-Temperature Projects of the Department of Energy's Geothermal Technologies Program: Evaluation and Lessons Learned

    Energy Technology Data Exchange (ETDEWEB)

    Williams, Tom; Snyder, Neil; Gosnold, Will

    2016-10-23

    This paper discusses opportunities and challenges related to the technical and economic feasibility of developing power generation from geothermal resources at temperatures of 150 degrees C and lower. Insights from projects funded by the U.S. Department of Energy (DOE), Geothermal Technologies Office inform these discussions and provide the basis for some lessons learned to help guide decisions by DOE and the industry in further developing this resource. The technical basis for low-temperature geothermal energy is well established and the systems can be economic today in certain situations. However, these applications are far from a 'plug and play' product; successful development today requires a good knowledge of geothermal system design and operation.

  1. Uncertainty analysis of geothermal energy economics

    Science.gov (United States)

    Sener, Adil Caner

    This dissertation research endeavors to explore geothermal energy economics by assessing and quantifying the uncertainties associated with the nature of geothermal energy and energy investments overall. The study introduces a stochastic geothermal cost model and a valuation approach for different geothermal power plant development scenarios. The Monte Carlo simulation technique is employed to obtain probability distributions of geothermal energy development costs and project net present values. In the study a stochastic cost model with incorporated dependence structure is defined and compared with the model where random variables are modeled as independent inputs. One of the goals of the study is to attempt to shed light on the long-standing modeling problem of dependence modeling between random input variables. The dependence between random input variables will be modeled by employing the method of copulas. The study focuses on four main types of geothermal power generation technologies and introduces a stochastic levelized cost model for each technology. Moreover, we also compare the levelized costs of natural gas combined cycle and coal-fired power plants with geothermal power plants. The input data used in the model relies on the cost data recently reported by government agencies and non-profit organizations, such as the Department of Energy, National Laboratories, California Energy Commission and Geothermal Energy Association. The second part of the study introduces the stochastic discounted cash flow valuation model for the geothermal technologies analyzed in the first phase. In this phase of the study, the Integrated Planning Model (IPM) software was used to forecast the revenue streams of geothermal assets under different price and regulation scenarios. These results are then combined to create a stochastic revenue forecast of the power plants. The uncertainties in gas prices and environmental regulations will be modeled and their potential impacts will be

  2. The Bonneville Power Administration's geothermal program

    International Nuclear Information System (INIS)

    Darr, G.D.

    1990-01-01

    Despite being a power source with many desirable characteristics, geothermal has not been developed in the Pacific Northwest because of high costs, high risks, and the lack of a market for power. The region will require new power sources in the 1990s, and will need to know to what extent it can rely on geothermal. The Bonneville Power Administration has developed a geothermal RD and D program which includes a proposal to award power contracts to three pilot projects in the Northwest. Public outreach efforts, environmental base line studies, and economic and land use impact studies will also be undertaken. In this paper two projects already under way are discussed

  3. Policy for geothermal energy development

    Energy Technology Data Exchange (ETDEWEB)

    Kiuchi, S [Public Utilities Bureau, Ministry of International Trade and Industry, Japan

    1973-01-01

    Government actions related to Japanese geothermal energy development in the past include: a mining and industrial research subsidy of 27 million yen granted to Kyushu Electric Power Co. in 1952, a mining and industrial research subsidy of 13 million yen granted to Japan Metals and Chemicals Co. in 1960, a study on steam production technology for geothermal power generation by Japan Metals and Chemicals Co. funded at 3.5 hundred million yen from the Research Development Corporation of Japan, and a study on steam production technology for large scale geothermal power generation by Japan Metals and Chemicals Co. funded at 7.6 hundred million yen by the Research Development Corporation of Japan. The following projects are planned by the Ministry of International Trade and Industry for 1973: a two-year geothermal power promotion including investigations into the utilization of hot water, new methods for geothermal reservoir detection and steam well drilling, and environmental effects, studies on hydrothermal systems, basic investigations for geothermal indicators in 30 areas, and a means to finance the construction of geothermal power plants in Kakkonda (Iwate Prefecture) and Hatchobara (Oita Prefecture).

  4. Improving the Environmental Sustainability of Flash Geothermal Power Plants—A Case Study

    Directory of Open Access Journals (Sweden)

    Lorenzo Bruscoli

    2015-11-01

    Full Text Available The sustainability of geothermal energy production is analyzed with reference to a production plant located in a specific area (Monte Amiata, Italy. Four solutions combining a flash power plant with an Organic Rankine Cycle in a hybrid configuration are analyzed in terms of production of electricity, exergy balance and emissions level (CO2, H2S, Hg. The different solutions correspond to increasing environmental performance, and for the most advanced case achieve near-zero emissions (complete reinjection of the natural resource, including incondensable gases. The results show that this can be achieved at the price of a progressive reduction of electrical productivity.

  5. Development of geothermal resources

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This paper describes the geothermal development promotion survey project. NEDO is taking the lead in investigation and development to reduce risks for private business entities and promote their development. The program is being moved forward by dividing the surveys into three ranks of A, B and C from prospects of geothermal resource availability and the state of data accumulation. The survey A lacks number of data, but covers areas as wide as 100 to 300 km{sup 2}, and studies possible existence of high-temperature geothermal energy. The survey B covers areas of 50 to 70 km{sup 2}, investigates availability of geothermal resources, and assesses environmental impacts. The survey C covers areas of 5 to 10 km{sup 2}, and includes production well drilling and long-term discharge tests, other than those carried out by the surveys A and B. Results derived in each fiscal year are evaluated and judged to establish development plans for the subsequent fiscal year. This paper summarizes development results on 38 areas from among 45 areas surveyed since fiscal 1980. Development promotion surveys were carried out over seven areas in fiscal 1994. Development is in progress not only on utilization of high-temperature steam, but also on binary cycle geothermal power generation utilizing hot waters of 80 to 150{degree}C. Fiscal 1994 has carried out discussions for spread and practical use of the systems (particularly on economic effects), and development of small-to-medium scale binary systems. 2 figs., 1 tab.

  6. Innovative exploration technologies in the Jemez Geothermal Project, New Mexico, USA; Innovative Explorationstechniken im Jemez Geothermal Projekt, New Mexico, USA

    Energy Technology Data Exchange (ETDEWEB)

    Albrecht, Michael [TBAPower Inc., Salt Lake City, UT (United States); Tenzer, Helmut; Sperber, Axel; Bussmann, Werner [uutGP GmbH, Geeste (Germany)

    2012-10-16

    First geothermal explorations were carried out in the year 1989 in the sovereign Indian Reservation situated nearly 70 km northwest of Albuquerque. (New Mexico, United States of America). In 1991, an exploration drilling at a depth of 80 meter supplied artesian 52 Celsius hot water with xx L/s. Different feasibility studies on the geothermal utilization and on different utilization concepts were established. The economic situation of the region has to be improved by means of a coupled geothermal utilization. The region was explored by means of magnetotellurics (up to depth of 8 kilometre) and reflection seismics (up to a depth of 2.2 kilometre). A graben structure between the Indian Spring fault in the west and the Vallecitos fault in the east are indicative of a geothermal convection zone. Subsequently, an innovative seismic data analysis by means of Elastic Wave Reverse-Time Migration and Wavefield-Separation Imaging Condition was performed. The previous model could be improved considerably. A preliminary drilling program up to a depth of 2,000 meter with Casing design and planning of the borepath occurred. Under socio-economic aspects, up to nine members of the tribe enjoyed an education or further training to engineers under the control of TBA Power Inc. (Salt Laky City, Utah, United State of America).

  7. Direct use applications of geothermal resources at Desert Hot Springs, California. Final report, May 23, 1977--July 31, 1978. Volume II: appendixes

    Energy Technology Data Exchange (ETDEWEB)

    Christiansen, C.C.

    1978-07-01

    The following appendixes are included: Desert Hot Springs (DHS) Geothermal Project Advisory Board, Geothermal Citizens Advisory Committee, community needs assessment, geothermal resource characterization, a detailed discussion of the geothermal applications considered for DHS, space/water heating, agricultural operations, detailed analysis of a geothermal aquaculture facility, detailed discussion of proposed energy cascading systems for DHS, regulatory requirements, environmental impact assessment, resource management plan, and geothermal resources property rights and powers of cities to regulate indigenous geothermal resources and to finance construction of facilities for utilization of such resources. (MHR)

  8. The Oregon Geothermal Planning Conference

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-10-02

    Oregon's geothermal resources represent a large portion of the nation's total geothermal potential. The State's resources are substantial in size, widespread in location, and presently in various stages of discovery and utilization. The exploration for, and development of, geothermal is presently dependent upon a mixture of engineering, economic, environmental, and legal factors. In response to the State's significant geothermal energy potential, and the emerging impediments and incentives for its development, the State of Oregon has begun a planning program intended to accelerate the environmentally prudent utilization of geothermal, while conserving the resource's long-term productivity. The program, which is based upon preliminary work performed by the Oregon Institute of Technology's Geo-Heat Center, will be managed by the Oregon Department of Energy, with the assistance of the Departments of Economic Development, Geology and Mineral Industries, and Water Resources. Funding support for the program is being provided by the US Department of Energy. The first six-month phase of the program, beginning in July 1980, will include the following five primary tasks: (1) coordination of state and local agency projects and information, in order to keep geothermal personnel abreast of the rapidly expanding resource literature, resource discoveries, technological advances, and each agency's projects. (2) Analysis of resource commercialization impediments and recommendations of incentives for accelerating resource utilization. (3) Compilation and dissemination of Oregon geothermal information, in order to create public and potential user awareness, and to publicize technical assistance programs and financial incentives. (4) Resource planning assistance for local governments in order to create local expertise and action; including a statewide workshop for local officials, and the formulation of two specific community resource development

  9. Preliminary environmental analysis of a geopressured-geothermal test well in Brazoria County, Texas

    Energy Technology Data Exchange (ETDEWEB)

    White, W.A.; McGraw, M.; Gustavson, T.C.; Meriwether, J.

    1977-11-16

    Preliminary environmental data, including current land use, substrate lithology, soils, natural hazards, water resources, biological assemblages, meteorological data, and regulatory considerations have been collected and analyzed for approximately 150 km/sup 2/ of land near Chocolate Bayou, Brazoria County, Texas, in which a geopressured-geothermal test well is to be drilled in the fall of 1977. The study was designed to establish an environmental data base and to determine, within spatial constraints set by subsurface reservoir conditions, environmentally suitable sites for the proposed well. Preliminary analyses of data revealed the eed for focusing on the following areas: potential for subsidence and fault activation, susceptibility of test well and support facilities to fresh- and salt-water flooding, possible effects of produced saline waters on biological assemblages and groundwaer resources, distribution of expansive soils, and effect of drilling and associated support activities on known archeological-cultural resources.

  10. Application of Environmental Isotope and Hydrogeochemical Techniques in Investigating the Geothermal Resources

    International Nuclear Information System (INIS)

    Kamarudin Samuding; Noor Akhmal Kamarudin; Mohd Shahrizal Mohamed Sharifodin; Azrul Arifin; Kamaruzaman Mohamad

    2016-01-01

    An investigation of geothermal resources at Ulu Slim has been carried out using integrated environmental isotope and hydro-geochemical techniques. Environmental isotope Oxygen-18 ("1"8O) and Deuterium ("2H) and Tritium ("3H) were used to identify the recharge zones and origin of the water, whereas the hydro-geochemical technique is used to determine the water type and the level of solutes in the geothermal waters out flowing at the surface as well as in shallow and deep groundwater system. The sampling programme includes precipitations, surface waters, hot springs, groundwater for isotopes and hydro-geochemical analyses. The plot graph of (δ"1"8O vs δ"2H) show that the stable isotope composition of hot spring is relatively depleted as compared to surface water and groundwater. This indicates that the recharge of the hot spring is likely to occur from farther and higher elevation areas of the geothermal system. Tritium content in hot spring, groundwater and surface water is ranged between 0.85 - 0.92 TU, 0.81- 1.05 TU, 1.60-2.07 TU respectively. The values of TU in hot spring and groundwater is seen similar suggests that these samples are older than the surface water. Based on the plot of Ternary Major Anion diagram (Cl-SO_4- HCO_3) and Tri-linear Piper diagram, all the water samples are identified from the type of bicarbonate (HCO_3). Nevertheless, the content of sodium (Na) in hot spring is detected relatively higher as compared to surface water. Tri-linear Piper diagram also shows that there is no mixing process between hot spring and surface water. (author)

  11. 233S Decommissioning Project Environmental Control Plan

    International Nuclear Information System (INIS)

    Zoric, J.P.

    2000-01-01

    This Environmental Control Plan is for the 233S Decommissioning activities conducted under the removal action report for the 233S Decontamination and Demolition Project. The purpose of this ECP is to identify environmental requirements for the 233S project. The ECP is a compilation of existing environmental permit conditions, regulatory requirements, and environmental requirements applicable to the specific project or functional activity

  12. Geothermal energy

    International Nuclear Information System (INIS)

    Vuataz, F.-D.

    2005-01-01

    This article gives a general overview of the past and present development of geothermal energy worldwide and a more detailed one in Switzerland. Worldwide installed electrical power using geothermal energy sources amounts to 8900 MW el . Worldwide utilization of geothermal energy for thermal applications amounts to 28,000 MW th . The main application (56.5%) is ground-coupled heat pumps, others are thermal spas and swimming pools (17.7%), space heating (14.9%), heating of greenhouses (4.8%), fish farming (2.2%), industrial uses (1,8%), cooling and melting of snow (1.2%), drying of agricultural products (0.6 %). Switzerland has become an important user of geothermal energy only in the past 25 years. Earlier, only the exploitation of geothermal springs (deep aquifers) in Swiss thermal baths had a long tradition, since the time of the Romans. Today, the main use of geothermal energy is as a heat source for heat pumps utilizing vertical borehole heat exchangers of 50 to 350 meters length. 35,000 installations of this type with heating powers ranging from a few kW to 1000 kW already exist, representing the highest density of such installations worldwide. Other developments are geostructures and energy piles, the use of groundwater for heating and cooling, geothermal district heating, the utilization of draining water from tunnels and the project 'Deep Heat Mining' allowing the combined production of heat and electric power

  13. Environmental restoration project configuration control

    International Nuclear Information System (INIS)

    Hutterman, L.L.

    1991-01-01

    This paper provides an overview of the approach that Westinghouse Idaho Nuclear Company, Inc. (WINCO) is using for the implementation of the configuration control requirements for a major system acquisition under the guidance of US Department of Energy (DOE) Order 4700.1, open-quotes Project Management System,close quotes for environmental restoration. The two major features of the WINCO environmental restoration approach relate to (1) the product and (2) the maintenance of the baseline for many sites in different phases at the same time. Historically, a project has typically produced a product. Environmental restoration in some ways produces no typical project product. Essentially, what is produced and what configuration control management is exercised on is one of the following: (1) the development of clean dirt, (2) the documentation to support clean dirt, or (3) the track record of each of the sites. It is the latter approach that this paper deals with. This approach is unique in that there are four baselines [cost, schedule, scope, and technical (the track record product)] rather than the typical three. This is essential in configuration management due to the lack of a uniquely identifiable product for each site. Essentially, the philosophy behind the four-part configuration controls allows the technical baseline to fulfill the function typically met by the identifiable product

  14. Analysis of how changed federal regulations and economic incentives affect financing of geothermal projects

    Energy Technology Data Exchange (ETDEWEB)

    Meyers, D.; Wiseman, E.; Bennett, V.

    1980-11-04

    The effects of various financial incentives on potential developers of geothermal electric energy are studied and the impact of timing of plant construction costs on geothermal electricity costs is assessed. The effect of the geothermal loan guarantee program on decisions by investor-owned utilities to build geothermal electric power plants was examined. The usefulness of additional investment tax credits was studied as a method for encouraging utilities to invest in geothermal energy. The independent firms which specialize in geothermal resource development are described. The role of municipal and cooperative utilities in geothermal resource development was assessed in detail. Busbar capital costs were calculated for geothermal energy under a variety of ownerships with several assumptions about financial incentives. (MHR)

  15. Final Technical Resource Confirmation Testing at the Raft River Geothermal Project, Cassia County, Idaho

    Energy Technology Data Exchange (ETDEWEB)

    Glaspey, Douglas J.

    2008-01-30

    Incorporates the results of flow tests for geothermal production and injection wells in the Raft River geothermal field in southern Idaho. Interference testing was also accomplished across the wellfield.

  16. Guanacaste Geothermal Project. Technical prefeasibility report. Annex F. Heat flow. [Las Hornillas, Las Pailas, and Boriaguen

    Energy Technology Data Exchange (ETDEWEB)

    1976-12-01

    This report is the sixth of six annexes (designated A through F) to the Summary Report on the First Phase of the Guanacaste Geothermal Project. The studies covered an area of 500 km/sup 2/ on the SW flanks of the Rincon de la Vieja and Miravalles volcanoes of the Guanacaste Volcanic Range in NW Costa Rica, and were aimed at locating zones of high geothermal gradient, and reconstruction of the stratigraphic column. The three areas that have the highest geothermal resource potential were investigated for heat flow. They are the zones of Las Hornillas on the slopes of the Miravalles volcano, Las Pailas on the slopes of the Rincon de la Vieja volcano and, to a lesser extent, the zone of Borinquen. A total of 2500 meters were drilled in 35 thermal gradient wells. Of these, 27 wells were drilled in the Las Hornillas zone, 7 in Las Pailas, and only 1 in Borinquen. In the Las Hornillas zone of the Miravalles volcano, the temperature-vs.-depth profiles exhibit a higher slope in areas near the fumaroles, decreasing toward the interior of the caldera. This determines a zone of high slope curves coinciding with the 1000/sup 0/C/km gradient contour. In the most significant well, temperatures above 150/sup 0/C were recorded. Since this location was selected on the basis of the results of all the other studies, it is felt that a fair knowledge of the thermal flow pattern of this area has been obtained. Drilling of an additional gradient well about 200 m in depth, located on the 1000/sup 0/C/km contour, would adequately complement the information on this zone. The shallow gradient wells did not detect any significant result when located away from the zones of fumarole activity. (JGB)

  17. Phase 1 Feasibility Study, Canby Cascaded Geothermal Project, April 2, 2013

    Energy Technology Data Exchange (ETDEWEB)

    Merrick, Dale E [CanbyGeo, LLC

    2013-04-02

    A small community in Northern California is attempting to use a local geothermal resource to generate electrical power and cascade residual energy to an existing geothermal district heating system, greenhouse, and future fish farm and subsequent reinjection into the geothermal aquifer, creating a net-zero energy community, not including transportation.

  18. Environmental impacts of wind-energy projects

    National Research Council Canada - National Science Library

    Committee on Environmental Impacts of Wind Energy Projects; National Research Council; Division on Earth and Life Studies; National Research Council

    2007-01-01

    .... Environmental Impacts of Wind-Energy Projects offers an analysis of the environmental benefits and drawbacks of wind energy, along with an evaluation guide to aid decision-making about projects...

  19. The GEOFAR Project - Geothermal Finance and Awareness in Europeans Regions - Development of new schemes to overcome non-technical barriers, focusing particularly on financial barriers

    Science.gov (United States)

    Poux, Adeline; Wendel, Marco; Jaudin, Florence; Hiegl, Mathias

    2010-05-01

    Numerous advantages of geothermal energy like its widespread distribution, a base-load power and availability higher than 90%, a small footprint and low carbon emissions, and the growing concerns about climate changes strongly promote the development of geothermal projects. Geothermal energy as a local energy source implies needs on surface to be located close to the geothermal resource. Many European regions dispose of a good geothermal potential but it is mostly not sufficiently developed due to non-technical barriers occurring at the very early stages of the project. The GEOFAR Project carried out within the framework of EU's "Intelligent Energy Europe" (IEE) program, gathers a consortium of European partners from Germany, France, Greece, Spain and Portugal. Launched in September 2008, the aim of this research project is to analyze the mentioned non-technical barriers, focusing most particularly on economic and financial aspects. Based on this analysis GEOFAR aims at developing new financial and administrative schemes to overcome the main financial barriers for deep geothermal projects (for electricity and direct use, without heat pumps). The analysis of the current situation and the future development of geothermal energy in GEOFAR target countries (Germany, France, Greece, Spain, Portugal, Slovakia, Bulgaria and Hungary) was necessary to understand and expose the diverging status of the geothermal sector and the more and less complicated situation for geothermal projects in different Europeans Regions. A deeper analysis of 40 cases studies (operating, planned and failed projects) of deep geothermal projects also contributed to this detailed view. An exhaustive analysis and description of financial mechanisms already existing in different European countries and at European level to support investors completed the research on non-technical barriers. Based on this profound analysis, the GEOFAR project has made an overview of the difficulties met by project

  20. South Dakota geothermal handbook

    Energy Technology Data Exchange (ETDEWEB)

    1980-06-01

    The sources of geothermal fluids in South Dakota are described and some of the problems that exist in utilization and materials selection are described. Methods of heat extraction and the environmental concerns that accompany geothermal fluid development are briefly described. Governmental rules, regulations and legislation are explained. The time and steps necessary to bring about the development of the geothermal resource are explained in detail. Some of the federal incentives that encourage the use of geothermal energy are summarized. (MHR)

  1. Geothermal direct use engineering and design guidebook

    International Nuclear Information System (INIS)

    Lienau, P.J.; Lunis, B.C.

    1991-01-01

    The Geothermal Direct Use Engineering and Design Guidebook is designed to be a comprehensive, thoroughly practical reference guide for engineers and designers of direct heat projects. These projects could include the conversion of geothermal energy into space heating and cooling of buildings, district heating, greenhouse heating, aquaculture and industrial processing. The Guidebook is directed at understanding the nature of geothermal resources and the exploration of the resources, fluid sampling techniques, drilling, and completion of geothermal wells through well testing, and reservoir evaluation. It presents information useful to engineers on the specification of equipment including well pumps, piping, heat exchangers, space heating equipment, heat pumps and absorption refrigeration. A compilation of current information about greenhouse aquaculture and industrial applications is included together with a discussion of engineering cost analysis, regulation requirements, and environmental consideration. The purpose of the Guidebook is to provide an integrated view for the development of direct use projects for which there is a very large potential in the United States

  2. Geothermal direct use engineering and design guidebook

    Energy Technology Data Exchange (ETDEWEB)

    Lienau, P.J.; Lunis, B.C. (eds.)

    1991-01-01

    The Geothermal Direct Use Engineering and Design Guidebook is designed to be a comprehensive, thoroughly practical reference guide for engineers and designers of direct heat projects. These projects could include the conversion of geothermal energy into space heating and cooling of buildings, district heating, greenhouse heating, aquaculture and industrial processing. The Guidebook is directed at understanding the nature of geothermal resources and the exploration of the resources, fluid sampling techniques, drilling, and completion of geothermal wells through well testing, and reservoir evaluation. It presents information useful to engineers on the specification of equipment including well pumps, piping, heat exchangers, space heating equipment, heat pumps and absorption refrigeration. A compilation of current information about greenhouse aquaculture and industrial applications is included together with a discussion of engineering cost analysis, regulation requirements, and environmental consideration. The purpose of the Guidebook is to provide an integrated view for the development of direct use projects for which there is a very large potential in the United States.

  3. Geothermal direct use engineering and design guidebook

    Energy Technology Data Exchange (ETDEWEB)

    Bloomquist, R.G.; Culver, G.; Ellis, P.F.; Higbee, C.; Kindle, C.; Lienau, P.J.; Lunis, B.C.; Rafferty, K.; Stiger, S.; Wright, P.M.

    1989-03-01

    The Geothermal Direct Use Engineering and Design Guidebook is designed to be a comprehensive, thoroughly practical reference guide for engineers and designers of direct heat projects. These projects could include the conversion of geothermal energy into space heating cooling of buildings, district heating, greenhouse heating, aquaculture and industrial processing. The Guidebook is directed at understanding the nature of geothermal resources and the exploration of these resources, fluid sampling techniques, drilling, and completion of geothermal wells through well testing, and reservoir evaluation. It presents information useful to engineers on the specification of equipment including well pumps, piping, heat exchangers, space heating equipment, heat pumps and absorption refrigeration. A compilation of current information about greenhouse, aquaculture and industrial applications is included together with a discussion of engineering cost analysis, regulation requirements, and environmental considerations. The purpose of the Guidebook is to provide an integrated view for the development of direct use projects for which there is a very potential in the United States.

  4. Geothermal energy: a brief assessment

    Energy Technology Data Exchange (ETDEWEB)

    Lunis, B.C.; Blackett, R.; Foley, D. (eds.)

    1982-07-01

    This document includes discussions about geothermal energy, its applications, and how it is found and developed. It identifies known geothermal resources located in Western's power marketing area, and covers the use of geothermal energy for both electric power generation and direct applications. Economic, institutional, environmental, and other factors are discussed, and the benefits of the geothermal energy resource are described.

  5. Identification of environmental issues: Hybrid wood-geothermal power plant, Wendel-Amedee KGRA, Lassen County, California: First phase report

    Energy Technology Data Exchange (ETDEWEB)

    1981-08-14

    The development of a 55 MWe power plant in Lassen County, California, has been proposed. The proposed power plant is unique in that it will utilize goethermal heat and wood fuel to generate electrical power. This report identifies environmental issues and constraints which may impact the proposed hybrid wood-geothermal power plant. (ACR)

  6. Computational modeling of shallow geothermal systems

    CERN Document Server

    Al-Khoury, Rafid

    2011-01-01

    A Step-by-step Guide to Developing Innovative Computational Tools for Shallow Geothermal Systems Geothermal heat is a viable source of energy and its environmental impact in terms of CO2 emissions is significantly lower than conventional fossil fuels. Shallow geothermal systems are increasingly utilized for heating and cooling of buildings and greenhouses. However, their utilization is inconsistent with the enormous amount of energy available underneath the surface of the earth. Projects of this nature are not getting the public support they deserve because of the uncertainties associated with

  7. Surveys of forest bird populations found in the vicinity of proposed geothermal project subzones in the district of Puna, Hawaii

    International Nuclear Information System (INIS)

    Jacobi, J.D.; Reynolds, M.; Ritchotte, G.; Nielsen, B.; Viggiano, A.; Dwyer, J.

    1994-10-01

    This report presents data on the distribution and status of forest bird species found within the vicinity of proposed geothermal resource development on the Island of Hawaii. Potential impacts of the proposed development on the native bird populations found in the project are are addressed

  8. Surveys of forest bird populations found in the vicinity of proposed geothermal project subzones in the district of Puna, Hawaii

    Energy Technology Data Exchange (ETDEWEB)

    Jacobi, J.D.; Reynolds, M.; Ritchotte, G.; Nielsen, B.; Viggiano, A.; Dwyer, J.

    1994-10-01

    This report presents data on the distribution and status of forest bird species found within the vicinity of proposed geothermal resource development on the Island of Hawaii. Potential impacts of the proposed development on the native bird populations found in the project are are addressed.

  9. Project GeoPower: Basic subsurface information for the utilization of geothermal energy in the Danish-German border region

    DEFF Research Database (Denmark)

    Kirsch, Reinhard; Balling, Niels; Fuchs, Sven

    and require reliable cross-border management and planning tools. In the framework of the Interreg4a GeoPower project, fundamental geological and geophysical information of importance for the planning of geothermal energy utilization in the Danish-German border region was compiled and analyzed. A 3D geological......Information on both hydraulic and thermal conditions of the subsurface is fundamental for the planning and use of hydrothermal energy. This is paramount in particular for densely populated international border regions, where different subsurface applications may introduce conflicts of use...... on potential geothermal reservoirs, and a new 3D structural geological model was developed. The interpretation of petrophysical data (core data and well logs) allows to evaluate the hydraulic and thermal rock properties of geothermal formations and to develop a parameterized 3D thermal conductive subsurface...

  10. Commission decision on the Department of Water Resources' Application for Certification for the Bottle Rock Geothermal Project

    Energy Technology Data Exchange (ETDEWEB)

    1980-11-01

    The Application for Certification for the construction of a 55 MW geothermal power plant and related facilities in Lake County was approved subject to terms identified in the Final Decision. The following are covered: findings on compliance with statutory site-certification requirements; final environmental impact report; procedural steps; evidentiary bases; need, environmental resources; public health and safety; plant and site safety and reliability; socioeconomic, land use, and cultural concerns, and transmission tap line. (MHR)

  11. The EGS Collab Project: Stimulation Investigations for Geothermal Modeling Analysis and Validation

    Science.gov (United States)

    Blankenship, D.; Kneafsey, T. J.

    2017-12-01

    The US DOE's EGS Collab project team is establishing a suite of intermediate-scale ( 10-20 m) field test beds for coupled stimulation and interwell flow tests. The multiple national laboratory and university team is designing the tests to compare measured data to models to improve measurement and modeling toolsets available for use in field sites and investigations such as DOE's Frontier Observatory for Research in Geothermal Energy (FORGE) Project. Our tests will be well-controlled, in situexperiments focused on rock fracture behavior, seismicity, and permeability enhancement. Pre- and post-test modeling will allow for model prediction and validation. High-quality, high-resolution geophysical and other fracture characterization data will be collected, analyzed, and compared with models and field observations to further elucidate the basic relationships between stress, induced seismicity, and permeability enhancement. Coring through the stimulated zone after tests will provide fracture characteristics that can be compared to monitoring data and model predictions. We will also observe and quantify other key governing parameters that impact permeability, and attempt to understand how these parameters might change throughout the development and operation of an Enhanced Geothermal System (EGS) project with the goal of enabling commercial viability of EGS. The Collab team will perform three major experiments over the three-year project duration. Experiment 1, intended to investigate hydraulic fracturing, will be performed in the Sanford Underground Research Facility (SURF) at 4,850 feet depth and will build on kISMET Project findings. Experiment 2 will be designed to investigate hydroshearing. Experiment 3 will investigate changes in fracturing strategies and will be further specified as the project proceeds. The tests will provide quantitative insights into the nature of stimulation (e.g., hydraulic fracturing, hydroshearing, mixed-mode fracturing, thermal fracturing

  12. Achievement report for fiscal 1999 on project for supporting the formation of energy/environmental technology verification project. International joint verification research project (Use of combined binary power generation systems at new geothermal fields on Mindoro Island, the Philippines, and comparison with conventional power generation systems); 1999 nendo Philippines koku Mindoro to no shinki chinetsutai ni okeru combined binary hatsuden hoshiki no tekiyo seika hokokusho. Conventional hatsuden hoshiki tono hikaku kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    Concerning the Manito Lowlands geothermal field and the Montelago geothermal field where the systems are to be newly installed, the geothermal reservoir characteristics are assessed, and cost effectiveness is compared between different power generating systems. According to the investigations conducted into the two geothermal fields in the past, they are supposed to have geothermal potentials of the medium grade. Chemical analyses are conducted anew on this occasion into the hot spring water and fumarole gas, and the MT (magnetotelluric) method is implemented for the survey of reservoir distribution. It is now expected that approximately 20MWe will be exploited from each of the two geothermal fields. The power generation systems studied are the single flash type and double flash type for the conventional power generation system, and the cascade type, bottoming type, and two-phase binary type for the combined binary power generation system. As the result, it is concluded that the double flash type or two-phase binary type will be advantageous to the Manito Lowlands geothermal field, and the double flash type or bottoming type or two-phase binary type will be advantageous to the Montelago geothermal field. (NEDO)

  13. Exemplary subsurface geothermal projects in the western part of Germany; Beispiele zur Nutzung oberflaechennaher Geothermie im Westen Deutschlands

    Energy Technology Data Exchange (ETDEWEB)

    Sanner, B.; Mands, E. [UbeG GbR, Wetzlar (Germany); Kohlsch, O. [EWS Erdwaerme-Systemtechnik GmbH, Delbrueck (Germany)

    2004-12-01

    During the past few years, several projects involving ground source heat pumps were carried out in western Germany, especially in the Rhine-Main and Rhine-Ruhr-Sieg region including the cities of Frankfurt and Cologne. Some of the project partners are big names in industry, e.g. an office building of PhilipsSparte APD at Wetzlar and the museum building of chocolate producer Ritter Sport. Other projects are sited in rural regions, from the Black Forest to the Weserbergland hills. The contribution presents several interesting projects, e.g. the police headquarters building at Bonn (right bank, groundwater use) and the office building of the Federal Office of Environmental protection, also at Bonn (left bank, geothermal probles), and three school buildings in the Frankfurt/Main region at Glashuetten, Bad Homburg-Oberstedten and Usingen-Eschbach. (orig.) [German] In den letzten Jahren wurden im Westen Deutschlands eine ganze Reihe groesserer Projekte mit erdgekoppelten Waermepumpen verwirklicht, besonders im Rhein-Main-Gebiet und im Rhein-Ruhr-Sieg-Gebiet einschliesslich der Grossstaedte Frankfurt und Koeln. Zu den Bauherren zaehlen inzwischen auch bekannte Namen der deutschen Industrie. So wird in Wetzlar ein Buerogbaeude der PhilipsSparte APD mit Erdwaermesonden ausgeruestet, und das Museum des Schokoladenherstellers Ritter Sport wird auf Energiepfaehlen stehen. Abe auch im laendlichen Raum sind interessante Anlagen entstanden, vom Schwarzwald bis ins Weserbergland. Im Folgenden werden einige interessante Beispiele vorgestellt. Dabei sind Projekte in der Ausfuehrungsphase wie z.B. das Polizeipraesidium in Bonn (rechts des Rheins mit Grundwassernutzung), oder das Bundesamt fuer Naturschutz in Bonn, diesmal auf der linken Rheinseite und mit Erdwaermesonden. In Ausfuehrungn bzw. fertiggestellt sind auch Erdwaermesonden fuer 3 Schulen im Raum Frankfurt:/Main, in Glashuetten, Bad Homburg-Oberstedten und Usingen-Eschbach. (orig.)

  14. Environmental standards and project construction: A review

    International Nuclear Information System (INIS)

    Mason, P.F.; Thornberry, H.L.

    1991-01-01

    In the past decade, changes have occurred in the area of environmental regulation. This paper identifies the typical environmental standards applicable to project construction, recent environmental regulatory issues and trends, and identifies new environmental issues which must be considered in project construction. These include (1) handling hazardous chemicals in the workplace, (2) construction at formerly utilized sites, (3) disposal of debris, construction materials and hazardous waste, and (4) training and experience of construction personnel in environmental issues

  15. Southwest regional geothermal operations research program. Summary report. First project year, June 1977--August 1978

    Energy Technology Data Exchange (ETDEWEB)

    Meyer, R.T.; Davidson, R.

    1978-12-01

    A summary report is given of the information, data, and results presented by New Mexico Energy Institute and the five State Teams in their separate draft reports. The objective is to develop scenarios for the development of each identified geothermal resource area in Arizona, Colorado, Nevada, New Mexico and Utah. Included are an overview; an economic analysis; institutitional procedures, contraints, and incentives; location of geothermal resources in the southwest; geothermal development postulations, state by state; and recommended actions for promoting and accelerating geothermal development. (MHR)

  16. Recent drilling activities at the earth power resources Tuscarora geothermal power project's hot sulphur springs lease area.

    Energy Technology Data Exchange (ETDEWEB)

    Goranson, Colin

    2005-03-01

    Earth Power Resources, Inc. recently completed a combined rotary/core hole to a depth of 3,813 feet at it's Hot Sulphur Springs Tuscarora Geothermal Power Project Lease Area located 70-miles north of Elko, Nevada. Previous geothermal exploration data were combined with geologic mapping and newly acquired seismic-reflection data to identify a northerly tending horst-graben structure approximately 2,000 feet wide by at least 6,000 feet long with up to 1,700 feet of vertical offset. The well (HSS-2) was successfully drilled through a shallow thick sequence of altered Tertiary Volcanic where previous exploration wells had severe hole-caving problems. The ''tight-hole'' drilling problems were reduced using drilling fluids consisting of Polymer-based mud mixed with 2% Potassium Chloride (KCl) to reduce Smectite-type clay swelling problems. Core from the 330 F fractured geothermal reservoir system at depths of 2,950 feet indicated 30% Smectite type clays existed in a fault-gouge zone where total loss of circulation occurred during coring. Smectite-type clays are not typically expected at temperatures above 300 F. The fracture zone at 2,950 feet exhibited a skin-damage during injection testing suggesting that the drilling fluids may have caused clay swelling and subsequent geothermal reservoir formation damage. The recent well drilling experiences indicate that drilling problems in the shallow clays at Hot Sulphur Springs can be reduced. In addition, average penetration rates through the caprock system can be on the order of 25 to 35 feet per hour. This information has greatly reduced the original estimated well costs that were based on previous exploration drilling efforts. Successful production formation drilling will depend on finding drilling fluids that will not cause formation damage in the Smectite-rich fractured geothermal reservoir system. Information obtained at Hot Sulphur Springs may apply to other geothermal systems developed in

  17. The ICDP Snake River Geothermal Drilling Project: preliminary overview of borehole geophysics

    Science.gov (United States)

    Schmitt, Douglas R.; Liberty, Lee M.; Kessler, James E.; Kuck, Jochem; Kofman, Randolph; Bishop, Ross; Shervais, John W.; Evans, James P.; Champion, Duane E.

    2012-01-01

    Hotspot: The Snake River Geothermal Drilling Project was undertaken to better understand the geothermal systems in three locations across the Snake River Plain with varying geological and hydrological structure. An extensive series of standard and specialized geophysical logs were obtained in each of the wells. Hydrogen-index neutron and γ-γ density logs employing active sources were deployed through the drill string, and although not fully calibrated for such a situation do provide semi-quantitative information related to the ‘stratigraphy’ of the basalt flows and on the existence of alteration minerals. Electrical resistivity logs highlight the existence of some fracture and mineralized zones. Magnetic susceptibility together with the vector magnetic field measurements display substantial variations that, in combination with laboratory measurements, may provide a tool for tracking magnetic field reversals along the borehole. Full waveform sonic logs highlight the variations in compressional and shear velocity along the borehole. These, together with the high resolution borehole seismic measurements display changes with depth that are not yet understood. The borehole seismic measurements indicate that seismic arrivals are obtained at depth in the formations and that strong seismic reflections are produced at lithological contacts seen in the corresponding core logging. Finally, oriented ultrasonic borehole televiewer images were obtained over most of the wells and these correlate well with the nearly 6 km of core obtained. This good image log to core correlations, particularly with regards to drilling induced breakouts and tensile borehole and core fractures will allow for confident estimates of stress directions and or placing constraints on stress magnitudes. Such correlations will be used to orient in core orientation giving information useful in hydrological assessments, paleomagnetic dating, and structural volcanology.

  18. Geothermal Financing Workbook

    Energy Technology Data Exchange (ETDEWEB)

    Battocletti, E.C.

    1998-02-01

    This report was prepared to help small firm search for financing for geothermal energy projects. There are various financial and economics formulas. Costs of some small overseas geothermal power projects are shown. There is much discussion of possible sources of financing, especially for overseas projects. (DJE-2005)

  19. Final Report to DOE EERE – Geothermal Technologies Program Project Title: Monitoring and modeling of fluid flow in a developing enhanced geothermal system (EGS) reservoir

    Energy Technology Data Exchange (ETDEWEB)

    Fehler, Michael [Massachusetts Inst. of Technology (MIT), Cambridge, MA (United States)

    2017-04-19

    The primary objective of this project was to improve our ability to predict performance of an Enhanced Geothermal System (EGS) reservoir over time by relating, in a quantitative manner, microseismic imaging with fluid and temperature changes within the reservoir. Historically, microseismic data have been used qualitatively to place bounds on the growth of EGS reservoirs created by large hydraulic fracturing experiments. Previous investigators used an experimentally based fracture opening relationship (fracture aperture as a function of pressure), the spatial extent of microseismic events, and some assumptions about fracture frequency to determine the size of an EGS reservoir created during large pumping tests. We addressed a number of issues (1) locating microearthquakes that occur during hydraulic fracturing, (2) obtaining more information about a reservoir than the microearthquake locations from the microearthquake data, for example, information about the seismic velocity structure of the reservoir or the scattering of seismic waves within the reservoir, (3) developing an improved methodology for estimating properties of fractures that intersect wellbores in a reservoir, and (4) developing a conceptual model for explaining the downward growth of observed seismicity that accompanies some hydraulic injections into geothermal reservoirs. We used two primary microseismic datasets for our work. The work was motivated by a dataset from the Salak Geothermal Field in Indonesia where seismicity accompanying a hydraulic injection was observed to migrate downward. We also used data from the Soultz EGS site in France. We also used Vertical Seismic Profiling data from a well in the United States. The work conducted is of benefit for characterizing reservoirs that are created by hydraulic fracturing for both EGS and for petroleum recovery.

  20. Japanese geothermics

    International Nuclear Information System (INIS)

    Laplaige, P.

    1995-01-01

    At the end of the seventies, the NEDO (New Energy and Industrial Technology Development Organisation) and the Central Research Institute of Electric Power Industry have started two independent projects of deep geothermics research in Honshu island (Japan). The two sites are 50 km apart of each other and the boreholes have been drilled up to 2300 and 1100 m of depth, respectively, in hot-dry moderately fractured volcanic rocks. These sites are characterized by high geothermal gradients with a rock temperature reaching 250 C at the bottom of the wells. Hydraulic circulation tests are still in progress to evaluate the profitability of these sites. (J.S.). 1 fig., 1 photo

  1. Draft environmental impact report. California Department of Water Resources, Bottle Rock geothermal power plant, Lake County, CA

    Energy Technology Data Exchange (ETDEWEB)

    1979-12-01

    The California Department of Water Resources (DWR) proposes to construct the Bottle Rock power plant, a 55 MW geothermal power plant, at The Geysers Known Geothermal Resource Area (KGRA). The plant is projected to begin operation in April of 1983, and will be located in Lake County near the Sonoma County line on approximately 7.2 acres of the Francisco leasehold. The steam to operate the power plant, approximately 1,000,000 pounds/h, will be provided by McCulloch Geothermal Corporation. The power plant's appearance and operation will be basically the same as the units in operation or under construction in the KGRA. The power plant and related facilities will consist of a 55 MW turbine generator, a 1.1 mile (1.81 km) long transmission line, a condensing system, cooling tower, electrical switchyard, gas storage facility, cistern, and an atmospheric emission control system. DWR plans to abate hydrogen sulfide (H/sub 2/S) emissions through the use of the Stretford Process which scrubs the H/sub 2/S from the condenser vent gas stream and catalytically oxides the gas to elemental sulfur. If the Stretford Process does not meet emission limitations, a secondary H/sub 2/S abatement system using hydrogen peroxide/iron catalyst is proposed. The Bottle Rock project and other existing and future geothermal projects in the KGRA may result in cumulative impacts to soils, biological resources, water quality, geothermal steam resources, air quality, public health, land use, recreation, cultural resources, and aesthetics.

  2. Hanford Environmental Dose Reconstruction Project monthly report

    International Nuclear Information System (INIS)

    Finch, S.M.

    1991-10-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doeses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): Source terms; environmental transport; environmental monitoring data; demographics, agriculture, food habits; environmental pathways and dose estimates

  3. Poplar Island Environmental Restoration Project Nekton Data

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Poplar Island Environmental Restoration Project (PIERP) is a large scale 1,800 acres restoration project located in mid Chesapeake Bay. Fishery collections are...

  4. Geothermal for kids

    International Nuclear Information System (INIS)

    Nemzer, M.; Condy, M.

    1990-01-01

    This paper reports that educating children about geothermal energy is crucial to the future growth of the geothermal industry. The Geothermal Education Office (GEO) was founded in 1989 to provide materials and support to teachers and the geothermal community in educating grades K-12 about geothermal energy. GEO's goals are to: provide easy access to or referral to appropriate sources of geothermal information; foster teacher interest; create posters, booklets, lesson plans and other educational materials; monitor and review textbooks, encyclopedias and other educational materials distributed by educational groups to ensure inclusion of appropriate, accurate information and to encourage fair treatment of alternative energy resources; contribute articles to industry, science and educational publications; and foster communication and cooperation among GEO, the geothermal industry, government agencies, and educational and environmental groups

  5. Geothermal energy abstract sets. Special report No. 14

    Energy Technology Data Exchange (ETDEWEB)

    Stone, C. (comp.)

    1985-01-01

    This bibliography contains annotated citations in the following areas: (1) case histories; (2) drilling; (3) reservoir engineering; (4) injection; (5) geothermal well logging; (6) environmental considerations in geothermal development; (7) geothermal well production; (8) geothermal materials; (9) electric power production; (10) direct utilization of geothermal energy; (11) economics of geothermal energy; and (12) legal, regulatory and institutional aspects. (ACR)

  6. Geothermal energy in Jordan

    International Nuclear Information System (INIS)

    Al-Dabbas, Moh'd A. F.

    1993-11-01

    The potential of geothermal energy utilization in Jordan was discussed. The report gave a summary of the location of geothermal anomalies in Jordan, and of ongoing projects that utilize geothermal energy for greenhouse heating, fish farming, refrigeration by absorption, and water desalination of deep aquifers. The problems facing the utilization of geothermal energy in Jordan were identified to be financial (i.e. insufficient allocation of local funding, and difficulty in getting foreign financing), and inadequate expertise in the field of geothermal energy applications. The report gave a historical account of geothermal energy utilization activities in Jordan, including cooperation activities with international organizations and foreign countries. A total of 19 reports already prepared in the areas of geochemical and hydrological studies were identified. The report concluded that the utilization of geothermal energy offers some interesting economic possibilities. (A.M.H.). 4 refs. 1 map

  7. The GRETA project: the contribution of near-surface geothermal energy for the energetic self-sufficiency of Alpine regions

    Directory of Open Access Journals (Sweden)

    Alessandro Casasso

    2017-03-01

    Full Text Available The Alpine regions are deeply involved in the challenge set by climate change, which is a threat for their environment and for important economic activities such as tourism. The heating and cooling of buildings account for a major share of the total primary energy consumption in Europe, and hence the energy policies should focus on this sector to achieve the greenhouse gas reduction targets set by international agreements. Geothermal heat pump is one of the least carbon-intensive technologies for the heating and cooling of buildings. It exploits the heat stored within the ground, a local renewable energy source which is widely available across the Alpine territory. Nevertheless, it has been little considered by European policies and cooperation projects. GRETA (near-surface Geothermal REsources in the Territory of the Alpine space is a cooperation project funded by the EU INTERREG-Alpine Space program, aiming at demonstrating the potential of shallow geothermal energy and to foster its integration into energy planning instruments. It started in December 2015 and will last three years, involving 12 partners from Italy, France, Switzerland, Germany, Austria, and Slovenia. In this paper, the project is presented, along with the results of the first year of work.

  8. Reflectance spectral analyses for the assessment of environmental pollution in the geothermal site of Mt. Amiata (Italy)

    Science.gov (United States)

    Manzo, Ciro; Salvini, Riccardo; Guastaldi, Enrico; Nicolardi, Valentina; Protano, Giuseppe

    2013-11-01

    We studied the environmental impact of geothermal activities in the Mt. Amiata area, using on-site spectral analyses of various ecological components. Analytical techniques were based on the study of the “red-edge”, which represents the spectral feature of the reflectance spectra defined between red and infrared wavelengths (λ) within the range 670-780 nm. Since in the study area the geothermal exploitation causes the drifting of contaminants such as Hg, Sb, S, B, As and H2S (hydrogen sulfide) from power plants, the spectral response of vegetation and lichens depends on their distance from the power stations, and also on the exposed surface, material type and other physical parameters. In the present research, the spectral radiance of targets was measured in the field using an Analytical Spectral Device (ASD) Field-Spec™FR portable radiometer. Spectral measurements were made on vegetation and lichen samples located near to and far from geothermal areas and potential pollution sources (e.g., power plants), with the aim of spatially defining their environmental impact. Observations for vegetation and lichens showed correlation with laboratory chemical analyses when these organisms were under stress conditions. The evaluation of relationships was carried out using several statistical approaches, which allowed to identify methods for identifying contamination indicators for plants and lichens in polluted areas. Results show that the adopted spectral indices are sensitive to environmental pollution and their responses spatialstatically correlated to chemical and ecophysiological analyses within a notable distance.

  9. Geothermal district heating in Turkey: The Gonen case study

    International Nuclear Information System (INIS)

    Oktay, Zuhal; Aslan, Asiye

    2007-01-01

    The status of geothermal district heating in Turkey and its future prospects are reviewed. A description is given of the Gonen project in Balikesir province, the first system to begin citywide operation in the country. The geology and geothermal resources of the area, the history of the project's development, the problems encountered, its economic aspects and environmental contributions are all discussed. The results of this and other such systems installed in Turkey have confirmed that, in this country, heating an entire city based on geothermal energy is a significantly cleaner, cheaper option than using fossil fuels or other renewable energy resources. (author)

  10. Utilising geothermal energy in Victoria

    International Nuclear Information System (INIS)

    Driscoll, Jim

    2006-01-01

    Geothermal energy is generated from the radioactive decay of naturally occurring isotopes and about 20% is generated from primordial heat associated with the formation of the earth. Geothermal project reduce energy and water cost and reduces greenhouse gas emissions

  11. The Environmental Management Project Manager's Handbook for improved project definition

    International Nuclear Information System (INIS)

    1995-02-01

    The United States Department of Energy (DOE) is committed to providing high quality products that satisfy customer needs and are the associated with this goal, DOE personnel must possess the knowledge, skills, and abilities to ensure successful job performance. In addition, there must be recognition that the greatest obstacle to proper project performance is inadequate project definition. Without strong project definition, DOE environmental management efforts are vulnerable to fragmented solutions, duplication of effort, and wastes resources. The primary means of ensuring environmental management projects meet cost and schedule milestones is through a structured and graded approach to project definition, which is the focus of this handbook

  12. Hanford Environmental Dose Reconstruction Project monthly report

    International Nuclear Information System (INIS)

    Finch, S.M.

    1990-12-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that populations could have been have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Pacific Northwest Laboratory (PNL) under the direction of an independent Technical Steering Panel (TSP). The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demographics, agriculture, food habits; and environmental pathways and dose estimates. 3 figs., 3 tabs

  13. Environmental projects. Volume 3: Environmental compliance audit

    Science.gov (United States)

    1987-01-01

    The Goldstone Deep Space Communications Complex is part of NASA's Deep Space Network, one of the world's largest and most sensitive scientific telecommunications and radio navigation networks. Activities at Goldstone are carried out in support of six large parabolic dish antennas. In support of the national goal of the preservation of the environment and the protection of human health and safety, NASA, JPL and Goldstone have adopted a position that their operating installations shall maintain a high level of compliance with Federal, state, and local laws governing the management of hazardous substances, abestos, and underground storage tanks. A JPL version of a document prepared as an environmental audit of Goldstone operations is presented. Both general and specific items of noncompliance at Goldstone are identified and recommendations are provided for corrective actions.

  14. Three-dimensional numerical reservoir simulation of the EGS Demonstration Project at The Geysers geothermal field

    Science.gov (United States)

    Borgia, Andrea; Rutqvist, Jonny; Oldenburg, Curt M.; Hutchings, Lawrence; Garcia, Julio; Walters, Mark; Hartline, Craig; Jeanne, Pierre; Dobson, Patrick; Boyle, Katie

    2013-04-01

    The Enhanced Geothermal System (EGS) Demonstration Project, currently underway at the Northwest Geysers, California, aims to demonstrate the feasibility of stimulating a deep high-temperature reservoir (up to 400 °C) through water injection over a 2-year period. On October 6, 2011, injection of 25 l/s started from the Prati 32 well at a depth interval of 1850-2699 m below sea level. After a period of almost 2 months, the injection rate was raised to 63 l/s. The flow rate was then decreased to 44 l/s after an additional 3.5 months and maintained at 25 l/s up to August 20, 2012. Significant well-head pressure changes were recorded at Prati State 31 well, which is separated from Prati 32 by about 500 m at reservoir level. More subdued pressure increases occur at greater distances. The water injection caused induced seismicity in the reservoir in the vicinity of the well. Microseismic monitoring and interpretation shows that the cloud of seismic events is mainly located in the granitic intrusion below the injection zone, forming a cluster elongated SSE-NNW (azimuth 170°) that dips steeply to the west. In general, the magnitude of the events increases with depth and the hypocenter depth increases with time. This seismic cloud is hypothesized to correlate with enhanced permeability in the high-temperature reservoir and its variation with time. Based on the existing borehole data, we use the GMS™ GUI to construct a realistic three-dimensional (3D) geologic model of the Northwest Geysers geothermal field. This model includes, from the top down, a low permeability graywacke layer that forms the caprock for the reservoir, an isothermal steam zone (known as the normal temperature reservoir) within metagraywacke, a hornfels zone (where the high-temperature reservoir is located), and a felsite layer that is assumed to extend downward to the magmatic heat source. We then map this model onto a rectangular grid for use with the TOUGH2 multiphase, multicomponent, non

  15. Environmental studies conducted at the Fenton Hill Hot Dry Rock geothermal development site

    Energy Technology Data Exchange (ETDEWEB)

    Miera, F.R. Jr.; Langhorst, G.; McEllin, S.; Montoya, C.

    1984-05-01

    An environmental investigation of Hot Dry Rock (HDR) geothermal development was conducted at Fenton Hill, New Mexico, during 1976-1979. Activities at the Fenton Hill Site included an evaluation of baseline data for biotic and abiotic ecosystem components. Identification of contaminants produced by HDR processes that had the potential for reaching the surrounding environment is also discussed. Three dominant vegetative communities were identified in the vicinity of the site. These included grass-forb, aspen, and mixed conifer communities. The grass-forb area was identified as having the highest number of species encountered, with Phleum pratense and Dactylis glomerata being the dominant grass species. Frequency of occurrence and mean coverage values are also given for other species in the three main vegetative complexes. Live trapping of small mammals was conducted to determine species composition, densities, population, and diversity estimates for this component of the ecosystem. The data indicate that Peromyscus maniculatus was the dominant species across all trapping sites during the study. Comparisons of relative density of small mammals among the various trapping sites show the grass-forb vegetative community to have had the highest overall density. Comparisons of small mammal diversity for the three main vegetative complexes indicate that the aspen habitat had the highest diversity and the grass-forb habitat had the lowest. Analyses of waste waters from the closed circulation loop indicate that several trace contaminants (e.g., arsenic, cadmium, fluoride, boron, and lithium) were present at concentrations greater than those reported for surface waters of the region.

  16. Geothermal heating saves energy

    International Nuclear Information System (INIS)

    Romsaas, Tor

    2003-01-01

    The article reviews briefly a pioneer project for a construction area of 200000 m''2 with residences, business complexes, a hotel and conference centre and a commercial college in Oslo. The energy conservation potential is estimated to be about 60-70 % compared to direct heating with oil, gas or electricity as sources. There will also be substantial reduction in environmentally damaging emissions. The proposed energy central combines geothermal energy sources with heat pump technology, utilises water as energy carrier and uses terrestrial wells for energy storage. A cost approximation is presented

  17. The environmental cost in the mining projects

    International Nuclear Information System (INIS)

    Gaviria Rivera Antonio

    1992-01-01

    To evaluate and calculate the mining project, Environmental costs, besides the proper variables concerning the project. It is necessary to incorporate the distinct interrelations among the mining operation with the local and regional biophysics and. socio-economic environments existing in the project's area of influence

  18. Nevada Southwest Regional Geothermal Development Operations Research Project. Appendix 8 of regional operations research program for development of geothermal energy in the Southwest United States. Final technical report, June 1977--August 1978

    Energy Technology Data Exchange (ETDEWEB)

    Clark, Noel A.; Booth, G. Martin, III; Weber, Dorismae; Helseth, Barbara K.

    1979-01-01

    By the end of the first year of the Southwest Regional Geothermal Project, the Nevada State Team has defined over 300 geothermal sites. Because of the multitude of sites and data, scenarios for this first project-year have been completed for the twenty-six Nevada Geothermal Areas, which include all the specific sites. It is not improbable that fully one-third of the sites will eventually prove to be of high to intermediate temperature (i.e. > 150 C and 90-150 C) resources. Low temperature sites are also prominent, not only in number, but also in their distribution--each of Nevada's 17 counties has several such sites.

  19. Geothermal Today - 1999

    Energy Technology Data Exchange (ETDEWEB)

    None

    2000-05-01

    U.S. Department of Energy 1999 Geothermal Energy Program Highlights The Hot Facts Getting into Hot Water Turning Waste water into Clean Energy Producing Even Cleaner Power Drilling Faster and Cheaper Program in Review 1999: The Year in Review JanuaryCal Energy announced sale of Coso geothermal power plants at China Lake, California, to Caithness Energy, for $277 million. U.S. Export-Import Bank completed a $50 million refinancing of the Leyte Geothermal Optimization Project in the Philippines. F

  20. Environmental impact of production and use of geothermal energy in Ukraine

    OpenAIRE

    Лимаренко, Алексей Николаевич; Тараненко, Олеся Александровна

    2015-01-01

    General potential of geothermal resources of Ukraine and the possibilities of their use as an alternative fuel are considered in the article. The most promising regions of Ukraine for the development of geothermal energy were determined and the characteristics of the heat-transfer agent were described. Value engineering analysis of modern technologies of extraction of heat was carried out, taking into account a feasibility study. Possibilities of using depleted oil and gas fields were studied...

  1. Environmental Control Unit Harness Project

    Science.gov (United States)

    Oliva-Buisson, Yvette J.

    2014-01-01

    Testing four new Environmental Control Unit Harnesses for improved user comfort during SCAPE operations. Phase I, testing in a lab environment, Phase II will continue testing the best candidates in a field environment.

  2. 3D Groundwater flow model at the Upper Rhine Graben scale to delineate preferential target areas for geothermal projects

    Science.gov (United States)

    Armandine Les Landes, Antoine; Guillon, Théophile; Peter-Borie, Mariane; Rachez, Xavier

    2017-04-01

    Any deep unconventional geothermal project remains risky because of the uncertainty regarding the presence of the geothermal resource at depth and the drilling costs increasing accordingly. That's why this resource must be located as precisely as possible to increase the chances of successful projects and their economic viability. To minimize the risk, as much information as possible should be gathered prior to any drilling. Usually, the position of the exploration wells of geothermal energy systems is chosen based on structural geology observations, geophysics measurements and geochemical analyses. Confronting these observations to results from additional disciplines should bring more objectivity in locating the region to explore and where to implant the geothermal system. The Upper Rhine Graben (URG) is a tectonically active rift system that corresponds to one branch of the European Cenozoic Rift System where the basin hosts a significant potential for geothermal energy. The large fault network inherited from a complex tectonic history and settled under the sedimentary deposits hosts fluid circulation patterns. Geothermal anomalies are strongly influenced by fluid circulations within permeable structures such as fault zones. In order to better predict the location of the geothermal resource, it is necessary to understand how it is influenced by heat transport mechanisms such as groundwater flow. The understanding of fluid circulation in hot fractured media at large scale can help in the identification of preferential zones at a finer scale where additional exploration can be carried out. Numerical simulations is a useful tool to deal with the issue of fluid circulations through large fault networks that enable the uplift of deep and hot fluids. Therefore, we build a numerical model to study groundwater flow at the URG scale (150 x 130km), which aims to delineate preferential zones. The numerical model is based on a hybrid method using a Discrete Fracture Network

  3. Geothermal Power Technologies

    DEFF Research Database (Denmark)

    Montagud, Maria E. Mondejar; Chamorro, C.R.

    2017-01-01

    Although geothermal energy has been widely deployed for direct use in locations with especial geologic manifestations, its potential for power generation has been traditionally underestimated. Recent technology developments in drilling techniques and power conversion technologies from low......-temperature heat resources are bringing geothermal energy to the spotlight as a renewable baseload energy option for a sustainable energy mix. Although the environmental impact and economic viability of geothermal exploitation must be carefully evaluated for each case, the use of deep low-temperature geothermal...... reservoirs could soon become an important contributor to the energy generation around the world....

  4. Finding ways to say 'yes': report of the Laurier Avenue geothermal project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-09-30

    RESCo Energy Inc. (RESCo), Booz Engineering and R. Mancini And Associates were requested by Laurier Avenue residents and the Don Vale Cabbagetown Residents Association Inc. to work together to provide an engineering study on the feasibility of using geo-exchange heating and cooling for the heritage homes in the Laurier Avenue neighbourhood. The main purpose of the analysis was to examine the potential application of geothermal heating and other energy efficiency technologies in a heritage neighbourhood in Toronto. The study was also designed to evaluate the options to preserve ground-water run-off using permeable pavement solutions during road reconstruction. Aside from the comparison between existing technologies, this project also integrates political, bureaucratic, legal and financing aspects. Baseline conditions of the homes were identified and eco-energy audits were performed on some of them. Energy efficiencies are generally low in these homes and heating systems are not appropriate. Nevertheless, utility costs are generally moderate thanks to the small size and the proximity of the houses. Although they are effective, geo-exchange systems are expensive and still difficult to implement in an urban environment. The challenges they have to face involve using city property for borefields, heritage concerns, archaeological preservation and financial aspects. The scope of the study includes other efficiency technologies such as air source heat pumps, home air sealing and insulation upgrades and high efficiency hot water systems. The potential for electricity generation using renewable energy is limited by the site conditions. Considering Toronto's ambitions regarding energy-efficiency and GHG reductions, it will be necessary to identify solutions to reduce bureaucratic barriers to citizen initiatives like the one described here.

  5. Finding ways to say 'yes': report of the Laurier Avenue geothermal project

    International Nuclear Information System (INIS)

    2010-01-01

    RESCo Energy Inc. (RESCo), Booz Engineering and R. Mancini And Associates were requested by Laurier Avenue residents and the Don Vale Cabbagetown Residents Association Inc. to work together to provide an engineering study on the feasibility of using geo-exchange heating and cooling for the heritage homes in the Laurier Avenue neighbourhood. The main purpose of the analysis was to examine the potential application of geothermal heating and other energy efficiency technologies in a heritage neighbourhood in Toronto. The study was also designed to evaluate the options to preserve ground-water run-off using permeable pavement solutions during road reconstruction. Aside from the comparison between existing technologies, this project also integrates political, bureaucratic, legal and financing aspects. Baseline conditions of the homes were identified and eco-energy audits were performed on some of them. Energy efficiencies are generally low in these homes and heating systems are not appropriate. Nevertheless, utility costs are generally moderate thanks to the small size and the proximity of the houses. Although they are effective, geo-exchange systems are expensive and still difficult to implement in an urban environment. The challenges they have to face involve using city property for borefields, heritage concerns, archaeological preservation and financial aspects. The scope of the study includes other efficiency technologies such as air source heat pumps, home air sealing and insulation upgrades and high efficiency hot water systems. The potential for electricity generation using renewable energy is limited by the site conditions. Considering Toronto's ambitions regarding energy-efficiency and GHG reductions, it will be necessary to identify solutions to reduce bureaucratic barriers to citizen initiatives like the one described here.

  6. Geothermal energy worldwide

    International Nuclear Information System (INIS)

    Barbier, Enriko

    1997-01-01

    Geothermal energy, as a natural steam and hot water, has been exploited for decades in order to generate electricity as well as district heating and industrial processes. The present geothermal electrical installed capacity in the world is about 10.000 MWe and the thermal capacity in non-electrical uses is about 8.200 MWt. Electricity is produced with an efficiency of 10-17%, and the cost of the kWh is competitive with conventional energy sources. In the developing countries, where a total installed electrical power is still low, geothermal energy can play a significant role: in El Salvador, for example, 25% of electricity comes from geothermal spring, 20% in the Philippines and 8% in Kenya. Present technology makes it possible to control the environmental impact of geothermal exploitation. Geothermal energy could also be extracted from deep geopressured reservoirs in large sedimentary basins, hot dry rock systems and magma bodies. (author)

  7. Role of Hydrogeology in Professional Environmental Projects

    Science.gov (United States)

    The purpose of this presentation is to acquaint hydrogeology students how hydrogeological principles are applied in environmental engineering projects. This presentation outlines EPA's Superfund processes of site characterization, feasibility studies, and remediation processes.

  8. Prospects of geothermal energy

    International Nuclear Information System (INIS)

    Manzella, A.; Bianchi, A.

    2008-01-01

    Geothermal energy has great potential as a renewable energy with low environmental impact, the use of heat pumps is becoming established in Italy but the national contributions are still modest when compared to other nations. Mature technologies could double the installed geothermal power in Italy at 2020. [it

  9. Geothermal Program Review XVII: proceedings. Building on 25 years of Geothermal Partnership with Industry

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-10-01

    The US Department of Energy's Office (DOE) of Geothermal Technologies conducted its annual Program Review XVII in Berkeley, California, on May 18--20, 1999. The theme this year was "Building on 25 Years of Geothermal Partnership with Industry". In 1974, Congress enacted Public Law 93-410 which sanctioned the Geothermal Energy Coordination and Management Project, the Federal Government's initial partnering with the US geothermal industry. The annual program review provides a forum to foster this federal partnership with the US geothermal industry through the presentation of DOE-funded research papers from leaders in the field, speakers who are prominent in the industry, topical panel discussions and workshops, planning sessions, and the opportunity to exchange ideas. Speakers and researchers from both industry and DOE presented an annual update on research in progress, discussed changes in the environment and deregulated energy market, and exchanged ideas to refine the DOE Strategic Plan for research and development of geothermal resources in the new century. A panel discussion on Climate Change and environmental issues and regulations provided insight into the opportunities and challenges that geothermal project developers encounter. This year, a pilot peer review process was integrated with the program review. A team of geothermal industry experts were asked to evaluate the research in progress that was presented. The evaluation was based on the Government Performance and Results Act (GPRA) criteria and the goals and objectives of the Geothermal Program as set forth in the Strategic Plan. Despite the short timeframe and cursory guidance provided to both the principle investigators and the peer reviewers, the pilot process was successful. Based on post review comments by both presenters and reviewers, the process will be refined for next year's program review.

  10. Coordination of geothermal research

    Energy Technology Data Exchange (ETDEWEB)

    Jessop, A.M.; Drury, M.J.

    1983-01-01

    Visits were made in 1983 to various investigators and institutions in Canada to examine developments in geothermal research. Proposals for drilling geothermal wells to provide hot water for heating at a college in Prince Edward Island were made. In Alberta, the first phase of a program examining the feasibility of mapping sedimentary geothermal reservoirs was discussed. Some sites for possible geothermal demonstration projects were identified. In British Columbia, discussions were held between BC Hydro and Energy, Mines and Resources Canada on the drilling of a research hole into the peak of a temperature anomaly in the Meager Creek Valley. The British Columbia government has offered blocks of land in the Mount Cayley volcanic complex for lease to develop geothermal resources. A list of papers of interest to the Canadian geothermal energy program is appended.

  11. Blue Bahia: an environmental sanitation project

    International Nuclear Information System (INIS)

    Azcona, Miguel Angel L.; Neuvirth, Bruno

    1996-01-01

    The paper presents actions developed to incorporate some aspects of environmental sanitation to the basic sanitation project, natural resources assessing, identification of the environmental degradation sources - in addition to those caused by lack of basic sanitation, and common action between public and private sectors

  12. Assessment of the Appalachian Basin Geothermal Field: Combining Risk Factors to Inform Development of Low Temperature Projects

    Science.gov (United States)

    Smith, J. D.; Whealton, C.; Camp, E. R.; Horowitz, F.; Frone, Z. S.; Jordan, T. E.; Stedinger, J. R.

    2015-12-01

    Exploration methods for deep geothermal energy projects must primarily consider whether or not a location has favorable thermal resources. Even where the thermal field is favorable, other factors may impede project development and success. A combined analysis of these factors and their uncertainty is a strategy for moving geothermal energy proposals forward from the exploration phase at the scale of a basin to the scale of a project, and further to design of geothermal systems. For a Department of Energy Geothermal Play Fairway Analysis we assessed quality metrics, which we call risk factors, in the Appalachian Basin of New York, Pennsylvania, and West Virginia. These included 1) thermal field variability, 2) productivity of natural reservoirs from which to extract heat, 3) potential for induced seismicity, and 4) presence of thermal utilization centers. The thermal field was determined using a 1D heat flow model for 13,400 bottomhole temperatures (BHT) from oil and gas wells. Steps included the development of i) a set of corrections to BHT data and ii) depth models of conductivity stratigraphy at each borehole based on generalized stratigraphy that was verified for a select set of wells. Wells are control points in a spatial statistical analysis that resulted in maps of the predicted mean thermal field properties and of the standard error of the predicted mean. Seismic risk was analyzed by comparing earthquakes and stress orientations in the basin to gravity and magnetic potential field edges at depth. Major edges in the potential fields served as interpolation boundaries for the thermal maps (Figure 1). Natural reservoirs were identified from published studies, and productivity was determined based on the expected permeability and dimensions of each reservoir. Visualizing the natural reservoirs and population centers on a map of the thermal field communicates options for viable pilot sites and project designs (Figure 1). Furthermore, combining the four risk

  13. Environmental auditing for oil drilling projects

    International Nuclear Information System (INIS)

    Zambrano Solarte, Hugo Ibsen; Olaya Amaya, Alfredo

    2003-01-01

    The enforcement of legal regulations on the environment requires some mechanisms related to preservation and conservation of natural resources, as well as paleontological and archaeological wealth, in order to allow their use without endangering their integrity. This article reviews legal regulations, activities and performance indicators, which should be taken into account by Environmental Auditors in oil projects. Additionally, a Plan for Environmental management is analyzed with its main components and procedures for performing the environmental auditing

  14. Management systems for environmental restoration projects

    International Nuclear Information System (INIS)

    Harbert, R.R.

    1990-01-01

    This paper reports that the success fo large environmental restoration projects depends on sound management systems to guide the team of organizations and individuals responsible for the project. Public concern about and scrutiny of these environmental projects increase the stakes for those involved in the management of projects. The Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP) uses a system approach to performing and improving the work necessary to meet FUSRAP objectives. This approach to preforming and improving the work necessary to meet FUSRAP objectives. This approach is based upon management criteria embodied in DOE cost and schedule control system and the quality assurance requirements. The project team used complementary criteria to develop a system of related parts and processes working together to accomplish the goals of the project

  15. Environmental Restoration Project - Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    Anderson, T.D.

    1998-06-01

    This Environmental Restoration (ER) Project Systems Engineering Management Plan (SEMP) describes relevant Environmental Restoration Contractor (ERC) management processes and shows how they implement systems engineering. The objective of this SEMP is to explain and demonstrate how systems engineering is being approached and implemented in the ER Project. The application of systems engineering appropriate to the general nature and scope of the project is summarized in Section 2.0. The basic ER Project management approach is described in Section 3.0. The interrelation and integration of project practices and systems engineering are outlined in Section 4.0. Integration with sitewide systems engineering under the Project Hanford Management Contract is described in Section 5.0

  16. Projects: viable alternatives in the Environmental Education?

    Directory of Open Access Journals (Sweden)

    Marcos Jose Terossi

    2011-11-01

    Full Text Available In this article we are going to develop the reflection about the projects, its genesis, its use in education and environmental education.To this end, we will promote the discussion about the so-called "method of projects" and "projects pedagogy", with a comparison between them and outlining the approach that we consider most appropriate to EA, its limits and possibilities within the critical perspective, manufacturing and emancipatory education.

  17. Alternative techniques for environmental project management

    International Nuclear Information System (INIS)

    Reeves, S.

    1994-01-01

    Beginning in the late 1970s and early 1980s, increased regulation and recognition of ground water as an important natural resource led industry to address subsurface contamination at many sites. This caused the industry's dependence on environmental consultants to increase drastically. Initially, the accepted practice for addressing environmental concerns was to rely upon consultants to determine appropriate work scope, budgets, procedures and regulatory interaction. While significant advances have been made in technology and consulting services, improvement in project management and cost containment have been limited. In order to effectively manage environmental projects, it is imperative that business risks and standardized project management practices be factored into environmental solutions. A standardized environmental project management program was developed and applied to projects at petroleum marketing facilities throughout the United States. Following development and implementation, detailed studies were conducted to measure the value of standardization in reducing costs and enhancing efficiencies. The results indicate significant improvement in both reducing project costs and in enhancing the efficiency of consultants

  18. Hydrogeochemistry and environmental impact of geothermal waters from Yangyi of Tibet, China

    Science.gov (United States)

    Guo, Qinghai; Wang, Yanxin; Liu, Wei

    2009-02-01

    The Yangyi geothermal field, located 72 km northwest to Lhasa City, capital of Tibet, has a high reservoir temperature up to at least 207.2 °C. The geothermal waters from both geothermal wells and hot springs belong to the HCO 3 (+CO 3)-Na type. Factor analysis of all the chemical constituents shows that they can be divided into two factors: F 1 factor receives the contributions of SO 42-, Cl -, SiO 2, As, B, Na +, K +, and Li +; whereas F 2 factor is explained by HCO 3-, F -, CO 32-, Ca 2+, and Sr 2+. The F 1 factor can be regarded as an indicator of the reservoir temperature distribution at Yangyi, but its variable correlation with the results of different geothermometers (Na-K, quartz and K-Mg) does not allow one to draw further inferences. Different from F 1, the F 2 factor is an indicator of a group of hydrogeochemical processes resulting from the CO 2 pressure decrease in geothermal water during its ascent from the deep underground, including transformation of HCO 3- to CO 32-, precipitation of Ca 2+ and Sr 2+, and release of F - from some fluoride-bearing minerals of reservoir rocks. The plot of enthalpy vs. chloride, prepared on the basis of Na-K equilibrium temperatures, suggests that a parent geothermal liquid (PGL) with Cl - concentration of 185 mg/L (that of sample YYT-8) and enthalpy of 1020 J/g (corresponding to a temperature of 236-237 °C, i.e., somewhat higher than that of sample YYT-6) is present in the geothermal reservoir of the Yangyi area, below both the Qialagai valley and the Bujiemu valley, although the samples less affected by mixing and cooling (YYT-6 and YYT-7) come from the second site. The discharge of geothermal waters with high contents of toxic elements such as B, As and F into the Luolang River, the only drinking water source for local residents, has caused slight pollution of the river water. Great care should therefore be taken in the geothermal water resource management at Yangyi.

  19. Recovery Act: Geothermal Data Aggregation: Submission of Information into the National Geothermal Data System, Final Report DOE Project DE-EE0002852 June 24, 2014

    Energy Technology Data Exchange (ETDEWEB)

    Blackwell, David D. [SMU Geothermal Laboratory; Chickering Pace, Cathy [SMU Geothermal Laboratory; Richards, Maria C. [SMU Geothermal Laboratory

    2014-06-24

    The National Geothermal Data System (NGDS) is a Department of Energy funded effort to create a single cataloged source for a variety of geothermal information through a distributed network of databases made available via web services. The NGDS will help identify regions suitable for potential development and further scientific data collection and analysis of geothermal resources as a source for clean, renewable energy. A key NGDS repository or ‘node’ is located at Southern Methodist University developed by a consortium made up of: • SMU Geothermal Laboratory • Siemens Corporate Technology, a division of Siemens Corporation • Bureau of Economic Geology at the University of Texas at Austin • Cornell Energy Institute, Cornell University • Geothermal Resources Council • MLKay Technologies • Texas Tech University • University of North Dakota. The focus of resources and research encompass the United States with particular emphasis on the Gulf Coast (on and off shore), the Great Plains, and the Eastern U.S. The data collection includes the thermal, geological and geophysical characteristics of these area resources. Types of data include, but are not limited to, temperature, heat flow, thermal conductivity, radiogenic heat production, porosity, permeability, geological structure, core geophysical logs, well tests, estimated reservoir volume, in situ stress, oil and gas well fluid chemistry, oil and gas well information, and conventional and enhanced geothermal system related resources. Libraries of publications and reports are combined into a unified, accessible, catalog with links for downloading non-copyrighted items. Field notes, individual temperature logs, site maps and related resources are included to increase data collection knowledge. Additional research based on legacy data to improve quality increases our understanding of the local and regional geology and geothermal characteristics. The software to enable the integration, analysis, and

  20. Hydraulic fracturing to enhance geothermal energy recovery in deep and tight formations. Modell approach in petrothermy research project OPTIRISS

    Energy Technology Data Exchange (ETDEWEB)

    Rafiee, M.M.; Schmitz, S.; Barsch, M. [DBI - Gastechnologisches Institut gGmbH, Freiberg (Germany)

    2013-08-01

    In Germany numerous projects were successfully conducted in developments of geothermal energy which applied so far mostly for the hydrothermal deposit type. In Thuringia and Saxony there are currently project developments of geothermal resource taking into account for deep, tight formations in petrothermy and Enhanced geothermal system, (EGS). One of the potential tasks in generating these petrothermal producers and in the design of the underground power plant appears to be hydraulic fracturing with multi frac method. This is to create the heat exchanger surfaces in the rock and ensure maximum volumetric flow through it. Therefore it is very important for a sustainable heat production. However the promise of its adequate conductivity in the deep formation is one of the dominant contests in geothermal energy industry. In a multi frac method, two wells (normally horizontal wellbores at different depths) are drilled in direction of minimum horizontal stress of the formation rock. By multiple frac operation in separate sections, flow paths are generated between the wells through which it is possible to extract the heat from the rock. The numerical simulation of hydraulic fracture propagation processes in the rock is mainly from the research in the area of oil and gas industry. These techniques are mainly used for very low permeable formations in petroleum engineering (e.g. Shale gas). The development is at the beginning for EGS (e.g. granites). In this work single and multi fracking propagation processes in a synthetic example of deep hard formation are investigated. The numerical simulation is carried out to design and characterize frac processes and frac dimensions. Sensitivities to various rock parameters and different process designs are examined and optimum criteria are concluded. This shows that the minimum stress profile has the most effective role and should be modelled properly. The analysis indicates the optimum fracture length and height for adequate thermal

  1. Feasibility study of Copahue geothermal development project, Argentina; Aruzenchin kyowakoku Copahue chiiki no chinetsu kaihatsu chosa

    Energy Technology Data Exchange (ETDEWEB)

    Abe, M.; Yamada, M.; Nakanishi, S.; Todaka, N. [Electric Power Development Co. Ltd., Tokyo (Japan); Fujita, T.

    1996-03-15

    Geothermal resources have been evaluated in the Copahue district. For this survey administrated by JICA, drilling of a deep test well with a small bore (COP-3) and blowout tests were conducted. This district is located at the east side of the Andes elongated in the N-S direction. Volcanoes with similar active periods and active states are distributed in the N-S direction, which forms a divide with the Pacific Ocean side. The Copahue-Caviahue composite volcano in the surveyed area is located nearly in the central part of the volcanic zone, which forms a special ring topography. Geology of the Copahue district consists of volcanic effusive rocks during the Tertiary and Quaternary periods. There are five prospecting fields with geothermal indications in the surveyed area. From the survey, an area of about 13 km{sup 2} was evaluated as a geothermal resource field. Especially, in the area of about 4 km{sup 2} including COP-1, 2 and 3 wells, the steam predominant type reservoirs were found out. As a result of estimation of the geothermal resource potential by the volumetric method, a highly prospective power generation potential of 30 MW was evaluated in the field where the steam predominant type reservoirs were confirmed by the boring wells. 7 refs., 13 figs., 1 tab.

  2. Renewability of geothermal resources

    Energy Technology Data Exchange (ETDEWEB)

    O' Sullivan, Michael; Yeh, Angus [Department of Engineering Science, University of Auckland, Auckland (New Zealand); Mannington, Warren [Contact Energy Limited, Taupo (New Zealand)

    2010-12-15

    In almost all geothermal projects worldwide, the rate of extraction of heat energy exceeds the pre-exploitation rate of heat flow from depth. For example, current production of geothermal heat from the Wairakei-Tauhara system exceeds the natural recharge of heat by a factor of 4.75. Thus, the current rate of heat extraction from Wairakei-Tauhara is not sustainable on a continuous basis, and the same statement applies to most other geothermal projects. Nevertheless, geothermal energy resources are renewable in the long-term because they would fully recover to their pre-exploitation state after an extended shut-down period. The present paper considers the general issue of the renewability of geothermal resources and uses computer modeling to investigate the renewability of the Wairakei-Tauhara system. In particular, modeling is used to simulate the recovery of Wairakei-Tauhara after it is shut down in 2053 after a hundred years of production. (author)

  3. Cheap-GSHPs, an European project aiming cost-reducing innovations for shallow geothermal installations. - Geological data reinterpretation

    Science.gov (United States)

    Bertermann, David; Müller, Johannes; Galgaro, Antonio; Cultrera, Matteo; Bernardi, Adriana; Di Sipio, Eloisa

    2016-04-01

    The success and widespread diffusion of new sustainable technologies are always strictly related to their affordability. Nowadays the energy price fluctuations and the economic crisis are jeopardizing the development and diffusion of renewable technologies and sources. With the aim of both reduce the overall costs of shallow geothermal systems and improve their installation safety, an European project has took place recently, under the Horizon 2020 EU Framework Programme for Research and Innovation. The acronym of this project is Cheap-GSHPs, meaning "cheap and efficient application of reliable ground source heat exchangers and pumps"; the CHEAP-GSHPs project involves 17 partners among 9 European countries such Belgium, France, Germany, Greece, Ireland, Italy, Romania, Spain, Switzerland. In order to achieve the planned targets, an holistic approach is adopted, where all involved elements that take part of shallow geothermal activities are here integrated. In order to reduce the drilling specific costs and for a solid planning basis the INSPIRE-conformal ESDAC data set PAR-MAT-DOM ("parent material dominant") was analysed and reinterpreted regarding the opportunities for cost reductions. Different ESDAC classification codes were analysed lithologically and sedimentologically in order to receive the most suitable drilling technique within different formations. Together with drilling companies this geological data set was translated into a geotechnical map which allows drilling companies the usage of the most efficient drilling within a certain type of underground. The scale of the created map is 1: 100,000 for all over Europe. This leads to cost reductions for the final consumers. Further there will be the definition of different heat conductivity classes based on the reinterpreted PAR-MAT-DOM data set which will provide underground information. These values will be reached by sampling data all over Europe and literature data. The samples will be measured by several

  4. 1995 project of the year Hanford Environmental compliance project nomination

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, J.R.

    1996-02-01

    The completion of the Hanford Environmental Compliance (HEC) Project in December 1995 brought to a successful close a long line of major contributions to environmental cleanup. Not since the early days of the Hanford Site during and shortly after World War 11 had such a large group of diverse construction activities, with a common goal, been performed at Hanford. Key to this success was the unique combination of 14 subprojects under the HEC Project which afforded the flexibility to address evolving subproject requirements. This strategy resulted in the accomplishment of the HEC Project stakeholders` objectives on an aggressive schedule, at a $33 million cost savings to the customer. The primary objectives of the HEC Project were to upgrade selected Hanford Site facilities and systems to bring them into compliance with current environmental standards and regulations. The HEC Project contributed significantly towards the Hanford site compliance with Clean Water Act, Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements. It provided, in part, those construction activities required to comply with those requirements in the areas of liquid and solid waste treatment and disposal, waste characterization, and groundwater monitoring.

  5. 1995 project of the year Hanford Environmental compliance project nomination

    International Nuclear Information System (INIS)

    Kelly, J.R.

    1996-02-01

    The completion of the Hanford Environmental Compliance (HEC) Project in December 1995 brought to a successful close a long line of major contributions to environmental cleanup. Not since the early days of the Hanford Site during and shortly after World War 11 had such a large group of diverse construction activities, with a common goal, been performed at Hanford. Key to this success was the unique combination of 14 subprojects under the HEC Project which afforded the flexibility to address evolving subproject requirements. This strategy resulted in the accomplishment of the HEC Project stakeholders' objectives on an aggressive schedule, at a $33 million cost savings to the customer. The primary objectives of the HEC Project were to upgrade selected Hanford Site facilities and systems to bring them into compliance with current environmental standards and regulations. The HEC Project contributed significantly towards the Hanford site compliance with Clean Water Act, Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements. It provided, in part, those construction activities required to comply with those requirements in the areas of liquid and solid waste treatment and disposal, waste characterization, and groundwater monitoring

  6. Balancing energy and the environment: the case of geothermal development

    Energy Technology Data Exchange (ETDEWEB)

    Ellickson, P.L.; Brewer, S.

    1978-06-01

    The results of part of a Rand study on the federal role in resolving environmental issues arising out of the implementation of energy projects are reported. The projects discussed are two geothermal programs in California: the steam resource development at The Geysers (Lake and Sonoma counties) in northern California, and the wet brine development in the Imperial Valley in southern California.

  7. Environmental Management Assessment of the Fernald Environmental Management Project (FEMP)

    Energy Technology Data Exchange (ETDEWEB)

    1993-04-01

    This report documents the results of the Environmental Management Assessment performed at the Fernald Environmental Management Project (FEMP) in Fernald, Ohio. During this assessment, the activities conducted by the assessment team included review of internal documents and reports from previous audits and assessments; interviews with US Department of Energy (DOE) and FEMP contractor personnel; and inspection and observation of selected facilities and operations. The onsite portion of the assessment was conducted from March 15 through April 1, 1993, by DOE`s Office of Environmental Audit (EH-24) located within the Office of the Assistant Secretary for Environment, Safety, and Health (EH-1). EH-24 carries out independent assessments of DOE facilities and activities as part of the EH-1 Environment, Safety, and Health (ES&H) Oversight Audit Program. The EH-24 program is designed to evaluate the status of DOE facilities and activities with respect to compliance with Federal, state, and local environmental laws and regulations; compliance with DOE Orders, Guidance and Directives; conformance with accepted industry practices and standards of performance; and the status and adequacy of management systems developed to address environmental requirements. The Environmental Management Assessment of FEMP focused on the adequacy of environmental management systems. Further, in response to requests by the Office of Environmental Restoration and Waste Management (EM) and Fernald Field Office (FN), Quality Assurance and Environmental Radiation activities at FEMP were evaluated from a programmatic standpoint. The results of the evaluation of these areas are contained in the Environmental Protection Programs section in this report.

  8. Environmental Management Assessment of the Fernald Environmental Management Project (FEMP)

    International Nuclear Information System (INIS)

    1993-04-01

    This report documents the results of the Environmental Management Assessment performed at the Fernald Environmental Management Project (FEMP) in Fernald, Ohio. During this assessment, the activities conducted by the assessment team included review of internal documents and reports from previous audits and assessments; interviews with US Department of Energy (DOE) and FEMP contractor personnel; and inspection and observation of selected facilities and operations. The onsite portion of the assessment was conducted from March 15 through April 1, 1993, by DOE's Office of Environmental Audit (EH-24) located within the Office of the Assistant Secretary for Environment, Safety, and Health (EH-1). EH-24 carries out independent assessments of DOE facilities and activities as part of the EH-1 Environment, Safety, and Health (ES ampersand H) Oversight Audit Program. The EH-24 program is designed to evaluate the status of DOE facilities and activities with respect to compliance with Federal, state, and local environmental laws and regulations; compliance with DOE Orders, Guidance and Directives; conformance with accepted industry practices and standards of performance; and the status and adequacy of management systems developed to address environmental requirements. The Environmental Management Assessment of FEMP focused on the adequacy of environmental management systems. Further, in response to requests by the Office of Environmental Restoration and Waste Management (EM) and Fernald Field Office (FN), Quality Assurance and Environmental Radiation activities at FEMP were evaluated from a programmatic standpoint. The results of the evaluation of these areas are contained in the Environmental Protection Programs section in this report

  9. Hanford Environmental Dose Reconstruction Project monthly report

    International Nuclear Information System (INIS)

    McMakin, A.H., Cannon, S.D.; Finch, S.M.

    1992-09-01

    The objective of the Hanford Environmental Dose Reconstruction MDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The TSP consists of experts in envirorunental pathways. epidemiology, surface-water transport, ground-water transport, statistics, demography, agriculture, meteorology, nuclear engineering. radiation dosimetry. and cultural anthropology. Included are appointed members representing the states of Oregon, Washington, and Idaho, a representative of Native American tribes, and an individual representing the public. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates): Source Terms; Environmental Transport; Environmental Monitoring Data Demography, Food Consumption, and Agriculture; and Environmental Pathways and Dose Estimates

  10. Richland Environmental Restoration Project Baseline Multi Year Work Plan Volume 1 Richland Environmental Restoration Project Plan

    International Nuclear Information System (INIS)

    Wintczak, T.M.

    2001-01-01

    The purpose of this project specification is to provide an overall scoping and document for the Environmental Restoration project, and to provide a link between the overall Hanford Site scope and the ER project. The purpose of this project specification is to provide an overall scoping document for the ER Project, and to provide a link between the overall Hanford Site scope and the ER Project. Additionally, this specification provides an integrated and consolidated source of information for the Richland ER Project. It identifies the ER Project vision, mission, and goals, as well as the operational history of the Hanford Site, along with environmental setting and hazards. This ER Project Specification is part of the overall ER Project baseline

  11. Environmental issues of the Three Gorges project

    International Nuclear Information System (INIS)

    Fang Ziyun

    1994-01-01

    This article addresses the environmental status of the reservoir area, reservoir characteristics, and the information systems used for assessment of environmental impacts. The Three Gorges Project and the environment are examined in detail and benefits for the Yangtze River's middle reaches, the impact of inundation, and impacts on aquatic animals, human health, natural landscape, cultural relics, water temperature and quality, the river estuary, and the surrounding area are considered. (UK)

  12. Environmental analysis of geopressured-geothermal prospect areas, De Witt and Colorado counties, Texas. Final report, March 1 - August 31, 1979

    Energy Technology Data Exchange (ETDEWEB)

    Gustavson, T.C.; Reeder, F.S.; Badger, E.A.

    1980-02-01

    Information collected and analyzed for a preliminary environmental analysis of geopressured geothermal prospect areas in Colorado and DeWitt Counties, Texas is presented. Specific environmental concerns for each geopressured geothermal prospect area are identified and discussed. Approximately 218 km/sup 2/(85 mi/sup 2/) were studied in the vicinity of each prospect area to: (1) conduct an environmental analysis to identify more and less suited areas for geopressured test wells; and (2) provide an environmental data base for future development of geopressured geothermal energy resources. A series of maps and tables are included to illustrate environmental characteristics including: geology, water resources, soils, current land use, vegetation, wildlife, and meteorological characteristics, and additional relevant information on cultural resources, power- and pipelines, and regulatory agencies. A series of transparent overlays at the scale of the original mapping has also been produced for the purposes of identifying and ranking areas of potential conflict between geopressured geothermal development and environmental characteristics. The methodology for ranking suitability of areas within the two prospect areas is discussed in the appendix. (MHR)

  13. Do environmental projects promote gender equity?

    Science.gov (United States)

    Joekes, S

    1995-02-01

    In the 1980s, governments and development agencies began to recognize the need to consider gender issues in their environmental and natural resource management programs. First came the understanding that women play a vital role in the management of natural resources and often have a strong traditional and contemporary knowledge of their environment. To exclude them would damage the efficacy of any project. Next, donor agencies came to view women, in their roles as environmental managers, as vulnerable victims of and contributors to environmental degradation. When awareness grew of examples of women successfully fighting to conserve local resources, women were considered important local assets to be used in efforts toward better environmental management. New environmental projects began by asking whether the protected resource was used by men or women in order to target the crucial people. For example, when planning to preserve forests, it is useful to recognize that men typically use wood for construction and fencing, while women use it for cooking fires. It has become increasingly common for women to participate in water and sanitation committees. But good intentions have often been subverted. Community level management of environmental projects does not guarantee female participation. Sometimes involving women means that women do all the physical labor without receiving their fair share of the benefits. In areas where women's property rights are restricted, women will have little authority in resource management. Legal reforms are needed, but they must be complemented at the local level by collective action.

  14. Effective geothermal heat

    International Nuclear Information System (INIS)

    Abelsen, Atle

    2006-01-01

    Scandinavia's currently largest geothermal heating project: the New Ahus hospital, is briefly presented. 300-400 wells on a field outside the hospital are constructed to store energy for both heating and cooling purposes

  15. Environmental framework for the development of the Los Humeros, Puebla geothermal field; Contexto ambiental del desarrollo del campo geotermico de Los Humeros, Puebla

    Energy Technology Data Exchange (ETDEWEB)

    Pastrana Melchor, Eugenio J.; Fernandez Solorzano, Maria Elena; Mendoza Rangel, Ernesto; Hernandez Ayala, Cuauhtemoc [Comision Federal de Electricidad, Morelia, Michoacan (Mexico)

    2005-06-01

    The construction, operation and maintenance of the Los Humeros, Puebla, geothermal field were undertaken in accordance with Mexican environmental regulations. The resolutions on environmental impacts, license for atmospheric pollution prevention, concession title for exploitation and use of national waters, permission for wastewater discharging services, company registration for producing dangerous wastes and fulfillment of all conditions noted in the documents show the applicable environmental laws for the project have been followed. [Spanish] La construccion, operacion y mantenimiento del campo geotermoelectrico Los Humeros, Puebla, se ha llevado a cabo dentro del marco juridico ambiental vigente en Mexico. Las resoluciones en materia de impacto ambiental, la licencia en materia de prevencion de la contaminacion de la atmosfera, el titulo de concesion para explorar, usar o aprovechar aguas nacionales, el permiso para descargar aguas residuales domesticas, el registro como empresa generadora de residuos peligrosos, y el cumplimiento de las disposiciones y condicionantes establecidos en cada uno de estos documentos, evidencian la observancia de la legislacion ambiental aplicable al proyecto.

  16. Geothermal Energy and its Prospects in Lithuania

    International Nuclear Information System (INIS)

    Radeckas, B.

    1995-01-01

    Data on the geothermal resources in lithuania and on their prospective usage are presented. The analysis covers water horizons of the geothermal anomaly in West Lithuania and their hydrogeology. The energy of the 3 km thick geothermal source was evaluated. Technical and economical possibilities of using geothermal energy in West Lithuania are described. Some aspects of the investment and of the project of a geothermal power plant in Klaipeda are considered. (author). 6 refs., 6 tabs., 2 figs

  17. Feasibility Study of Economics and Performance of Geothermal Power Generation at the Lakeview Uranium Mill Site in Lakeview, Oregon. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Hillesheim, M.; Mosey, G.

    2013-11-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Lakeview Uranium Mill site in Lakeview, Oregon, for a feasibility study of renewable energy production. The EPA contracted with the National Renewable Energy Laboratory (NREL) to provide technical assistance for the project. The purpose of this report is to describe an assessment of the site for possible development of a geothermal power generation facility and to estimate the cost, performance, and site impacts for the facility. In addition, the report recommends development pathways that could assist in the implementation of a geothermal power system at the site.

  18. NPOESS Preparatory Project (NPP) Environmental Products

    Science.gov (United States)

    Grant, K. D.; Smith, D. C.

    2011-12-01

    The National Oceanic and Atmospheric Administration (NOAA) and National Aeronautics and Space Administration (NASA) are jointly acquiring the next-generation civilian weather and environmental satellite system: the Joint Polar Satellite System (JPSS). The Joint Polar Satellite System will contribute the afternoon orbit component and ground processing system of the restructured National Polar-orbiting Operational Environmental Satellite System (NPOESS). As such, the Joint Polar Satellite System replaces the current Polar-orbiting Operational Environmental Satellites (POES) managed by NOAA and the ground processing component of both POES and the Defense Meteorological Satellite Program (DMSP) replacement, known as the Defense Weather Satellite System (DWSS), managed by the Department of Defense (DoD). The Joint Polar Satellite System satellite will carry a suite of sensors designed to collect meteorological, oceanographic, climatological, and solar-geophysical observations of the earth, atmosphere, and space. The ground processing system for the Joint Polar Satellite System is known as the Common Ground System (JPSS CGS), and consists of a Command, Control, and Communications Segment (C3S) and the Interface Data Processing Segment (IDPS). Both are developed by Raytheon Intelligence and Information Systems (IIS). The Interface Data Processing Segment will process Joint Polar Satellite System and Defense Weather Satellite System satellite data to provide environmental data products (aka, Environmental Data Records or EDRs) to the National Oceanic and Atmospheric Administration and Department of Defense processing centers operated by the United States government. The Interface Data Processing Segment will process Environmental Data Records beginning with the NPOESS Preparatory Project (NPP) and continue through the lifetime of the Joint Polar Satellite System and Defense Weather Satellite System programs. Under the National Polar-orbiting Operational Environmental

  19. The Hanford Environmental Dose Reconstruction Project: Overview

    International Nuclear Information System (INIS)

    Haerer, H.A.; Freshley, M.D.; Gilbert, R.O.; Morgan, L.G.; Napier, B.A.; Rhoads, R.E.; Woodruff, R.K.

    1990-01-01

    In 1988, researchers began a multiyear effort to estimate radiation doses that people could have received since 1944 at the U.S. Department of Energy's Hanford Site. The study was prompted by increasing concern about potential health effects to the public from more than 40 yr of nuclear activities. We will provide an overview of the Hanford Environmental Dose Reconstruction Project and its technical approach. The work has required development of new methods and tools for dealing with unique technical and communication challenges. Scientists are using a probabilistic, rather than the more typical deterministic, approach to generate dose distributions rather than single-point estimates. Uncertainties in input parameters are reflected in dose results. Sensitivity analyses are used to optimize project resources and define the project's scope. An independent technical steering panel directs and approves the work in a public forum. Dose estimates are based on review and analysis of historical data related to operations, effluents, and monitoring; determination of important radionuclides; and reconstruction of source terms, environmental conditions that affected transport, concentrations in environmental media, and human elements, such as population distribution, agricultural practices, food consumption patterns, and lifestyles. A companion paper in this volume, The Hanford Environmental Dose Reconstruction Project: Technical Approach, describes the computational framework for the work

  20. Imperial Valley Environmental Project: progress report

    Energy Technology Data Exchange (ETDEWEB)

    Phelps, P.L.; Anspaugh, L.R. (eds.)

    1977-10-19

    Progress is reported in six areas of research: air quality, water quality, ecosystem quality, subsidence and seismicity, socioeconomic effects, and integrated assessment. A major goal of the air quality element is to evaluate the rate of emission of H/sub 2/S, CO/sub 2/, H/sub 2/, N/sub 2/, CH/sub 4/, and C/sub 2/H/sub 6/ from the operation of the geothermal loop experimental facility at Niland. Concentrations of H/sub 2/S were found to vary between 1500 to 4900 ppM by volume at the Niland facility. To distinguish between geothermal fluids and other waters, extensive sampling networks were established. A major accomplishment was the installation of a high-resolution subsidence-detection network in the Salton Sea geothermal field area, centered on the test facility at Niland. A major effort went into establishing a background of data needed for subsequent impact assessments related to socioeconomic issues raised by geothermal developments. Underway are a set of geothermal energy scenarios that include power development schedules, technology characterizations, and considerations of power-plant-siting criteria. A Gaussian air-pollution model was modified for use in preliminary air-quality assessments. A crop-growth model was developed to evaluate impacts of gases released from geothermal operations on various agricultural crops. Work is also reported on the legal analysis of geothermal legislation and the legal aspects of water-supply utilization. Remote sensing was directed primarily at the Salton Sea, Heber, Brawley, and East Mesa KGRAs. However, large-format photography of the entire Salton Trough was completed. Thermal and multispectral imaging was done for several selected sites in the Salton Sea KGRA. (JGB)

  1. Synopsis of Past Stimulation Methods in Enhanced (Engineered) Geothermal Systems, Boreholes, and Existing Hydrothermal Systems with Success Analysis and Recommendations for Future Projects

    Science.gov (United States)

    Broadhurst, T.; Mattson, E.

    2017-12-01

    Enhanced geothermal systems (EGS) are gaining in popularity as a technology that can be used to increase areas for geothermal resource procurement. One of the most important factors in the success of an EGS system is the success of the subsurface reservoir that is used for fluid flow and heat mining through advection. There are numerous challenges in stimulating a successful reservoir, including maintaining flow rates, minimizing leak off, preventing short-circuiting, and reducing the risk of microseismicity associated with subsurface activity. Understanding past examples of stimulation can be invaluable in addressing these challenges. This study provides an overview of stimulation methods that have been employed in EGS systems from 1974-2017. We include all geothermal reservoirs and demonstration projects that have experienced hydrofracturing, chemical stimulation, and induced thermal stress for a comprehensive list. We also examine different metrics and measures of success in geothermal reservoir stimulation to draw conclusions and provide recommendations for future projects. Multiple project characteristics are reported including geologic setting, stress conditions, reservoir temperature, injection specifics, resulting microseismicity, and overall project goals. Insight into optimal and unproductive stimulation methods is crucial to conserving mental capital, utilizing project funding, and ensuring EGS technology advances as efficiently as possible.

  2. Direct utilization of geothermal energy for space and water heating at Marlin, Texas. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Conover, M.F.; Green, T.F.; Keeney, R.C.; Ellis, P.F. II; Davis, R.J.; Wallace, R.C.; Blood, F.B.

    1983-05-01

    The Torbett-Hutchings-Smith Memorial Hospital geothermal heating project, which is one of nineteen direct-use geothermal projects funded principally by DOE, is documented. The five-year project encompassed a broad range of technical, institutional, and economic activities including: resource and environmental assessments; well drilling and completion; system design, construction, and monitoring; economic analyses; public awareness programs; materials testing; and environmental monitoring. Some of the project conclusions are that: (1) the 155/sup 0/F Central Texas geothermal resource can support additional geothermal development; (2) private-sector economic incentives currently exist, especially for profit-making organizations, to develop and use this geothermal resource; (3) potential uses for this geothermal resource include water and space heating, poultry dressing, natural cheese making, fruit and vegetable dehydrating, soft-drink bottling, synthetic-rubber manufacturing, and furniture manufacturing; (4) high maintenance costs arising from the geofluid's scaling and corrosion tendencies can be avoided through proper analysis and design; (5) a production system which uses a variable-frequency drive system to control production rate is an attractive means of conserving parasitic pumping power, controlling production rate to match heating demand, conserving the geothermal resource, and minimizing environmental impacts.

  3. Klickitat Cogeneration Project : Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Klickitat Energy Partners

    1994-09-01

    To meet BPA`s contractual obligation to supply electrical power to its customers, BPA proposes to acquire power generated by Klickitat Cogeneration Project. BPA has prepared an environmental assessment evaluating the proposed project. Based on the EA analysis, BPA`s proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 for the following reasons: (1)it will not have a significant impact land use, upland vegetation, wetlands, water quality, geology, soils, public health and safety, visual quality, historical and cultural resources, recreation and socioeconomics, and (2) impacts to fisheries, wildlife resources, air quality, and noise will be temporary, minor, or sufficiently offset by mitigation. Therefore, the preparation of an environmental impact statement is not required and BPA is issuing this FONSI (Finding of No Significant Impact).

  4. Klickitat Cogeneration Project: Final environmental assessment

    International Nuclear Information System (INIS)

    1994-09-01

    To meet BPA's contractual obligation to supply electrical power to its customers, BPA proposes to acquire power generated by Klickitat Cogeneration Project. BPA has prepared an environmental assessment evaluating the proposed project. Based on the EA analysis, BPA's proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 for the following reasons: (1)it will not have a significant impact land use, upland vegetation, wetlands, water quality, geology, soils, public health and safety, visual quality, historical and cultural resources, recreation and socioeconomics, and (2) impacts to fisheries, wildlife resources, air quality, and noise will be temporary, minor, or sufficiently offset by mitigation. Therefore, the preparation of an environmental impact statement is not required and BPA is issuing this FONSI (Finding of No Significant Impact)

  5. Geothermal energy. Program summary

    Energy Technology Data Exchange (ETDEWEB)

    1979-06-01

    Brief descriptions of geothermal projects funded through the Department of Energy during FY 1978 are presented. Each summary gives the project title, contractor name, contract number, funding level, dates, location, and name of the principal investigator, together with project highlights, which provide informaion such as objectives, strategies, and a brief project description. (MHR)

  6. Deep geothermal energy probe Heubach. Project plan and facility planning by using a practical example; Tiefen-Erdwaermesonde Heubach. Projektablauf und Anlagenplanung anhand eines Praxisbeispiels

    Energy Technology Data Exchange (ETDEWEB)

    Kuntz, David; Kuebert, Markus; Walker-Hertkorn, Simone [tewag GmbH, Starzach-Felldorf (Germany); Lemes, Zijad [HEAG Suedhessische Energie AG (HSE), Darmstadt (Germany). Q100 Regenerative Energien; Fritsche, Johann-Gerhard; Koett, Anne [Hessisches Landesamt fuer Umwelt und Geologie (HLUG), Wiesbaden (Germany)

    2012-10-16

    For the decentralized supply of an industrial company in Heubach nearby Gross-Umbach (Federal Republic of Germany) with geothermal energy for heating and cooling, the first geothermal deep drilling was performed in the German federal state of Hesse. The concept of a sustainable energy supply is based on the utilization of heat and cold from near-surface geothermal energy as well as on the heat production from an 800 metre coaxial deep geothermal probe (K-TEWS). HEAG Suedhessische Energie AG (Darmstadt, Bundesrepublik Deutschland) is the project manager. The company H. Anger's Soehne (Hessisch Lichtenau, Federal Republic of Germany) as a project partner is responsible for the execution of the drilling. Due to the innovative character and the outstanding importance for the future utilization of the geothermal energy for the energy supply, this project was promoted by the Hessian Ministry for the Environment, Energy, Agriculture and Consumer Protection (Wiesbaden, Federal Republic of Germany). The Hessian Agency for the Environment and Geology (Wiesbaden, Federal Republic of Germany) as well as the University Kassel (Kassel, Federal Republic of Germany) serve as scientific counterparts. Tewag GmbH (Regensburg, Federal Republic of Germany) is the technical planner of the geotechnical component of the execution of construction work, and is in charge of the thermal simulation and elaboration of the optimal extension concept. By means of this research and demonstration project, experiences on the heat supply using TEWS systems as well as on the project plan have to be acquired. Furthermore, experiences on the optimization in the planning and implementation are to be acquired in order to evaluate the transferability and economic efficiency at future locations practically. After presentation of the project, the authors of the contribution under consideration describe the planning phases of the project, some aspects of the public relations, the planning approaches, the

  7. HISPANIC ENVIRONMENTAL AND WASTE MANAGEMENT OUTREACH PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Sebastian Puente

    1998-07-25

    The Department of Energy Office of Environmental Management (DOE-EM) in cooperation with the Self Reliance Foundation (SRF) is conducting the Hispanic Environmental and Waste Management Outreach Project (HEWMO) to increase science and environmental literacy, specifically that related to nuclear engineering and waste management in the nuclear industry, among the US Hispanic population. The project will encourage Hispanic youth and young adults to pursue careers through the regular presentation of Spanish-speaking scientists and engineers and other role models, as well as career information on nationally broadcast radio programs reaching youth and parents. This project will encourage making science, mathematics, and technology a conscious part of the everyday life experiences of Hispanic youth and families. The SRF in collaboration with the Hispanic Radio Network (HRN) produces and broadcasts radio programs to address the topics and meet the objectives as outlined in the Environmental Literacy Plan and DOE-EM Communications Plan in this document. The SRF has in place a toll-free ''800'' number Information and Resource Referral (I and RR) service that national radio program listeners can call to obtain information and resource referrals as well as give their reactions to the radio programs that will air. HRN uses this feature to put listeners in touch with local organizations and resources that can provide them with further information and assistance on the related program topics.

  8. HISPANIC ENVIRONMENTAL AND WASTE MANAGEMENT OUTREACH PROJECT

    International Nuclear Information System (INIS)

    Sebastian Puente

    1998-01-01

    The Department of Energy Office of Environmental Management (DOE-EM) in cooperation with the Self Reliance Foundation (SRF) is conducting the Hispanic Environmental and Waste Management Outreach Project (HEWMO) to increase science and environmental literacy, specifically that related to nuclear engineering and waste management in the nuclear industry, among the US Hispanic population. The project will encourage Hispanic youth and young adults to pursue careers through the regular presentation of Spanish-speaking scientists and engineers and other role models, as well as career information on nationally broadcast radio programs reaching youth and parents. This project will encourage making science, mathematics, and technology a conscious part of the everyday life experiences of Hispanic youth and families. The SRF in collaboration with the Hispanic Radio Network (HRN) produces and broadcasts radio programs to address the topics and meet the objectives as outlined in the Environmental Literacy Plan and DOE-EM Communications Plan in this document. The SRF has in place a toll-free ''800'' number Information and Resource Referral (I and RR) service that national radio program listeners can call to obtain information and resource referrals as well as give their reactions to the radio programs that will air. HRN uses this feature to put listeners in touch with local organizations and resources that can provide them with further information and assistance on the related program topics

  9. Geothermal Energy: Evaluation of a Resource

    Science.gov (United States)

    Bockemuehl, H. W.

    1976-01-01

    This article suggests the use of geothermal energy for producing electricity, using as an example the development at Wairakei, New Zealand. Other geothermal areas are identified, and economic and environmental co sts of additional development are explored. (Author/AV)

  10. FASSET - An European project for environmental protection

    International Nuclear Information System (INIS)

    Bruchertseifer, F.

    2003-01-01

    The European research project ''FASSET'' (Framework ASSessment of Enviromental ImpacT) will provide a framework of the environmental impact of the effects of ionising radiation and will identify protection aims for the environmental protection. This project represent a collaboration of different organisations from the European community: Sweden, Norway, Finland, Great Britain, Spain, France and Germany. The German participants are the GSF-research centre for environment and health and the German radiation protection office. The project is founded by the 5 th EC research programme. The existing national and international radiation protection regulations are focused to the humans. Other species, like plants and animals, are protected indirectly, if their habitat are close to urban areas or they represent a part of the food chain. The ICRP position ''if the man is protected, nature is protected as well'' is now under reconsideration by a ICRP-Taskgroup. The identification of perilled real reference organism by the FASSET-project is an working tool for the definition of the protection aims. For that purpose the project is divided into three working packages: dosimetry, exposure pathways and effects. Another working package is responsible for the developing of the concept using the results provided by the other working packages. (orig.)

  11. Geothermal Energy in Ecuador

    International Nuclear Information System (INIS)

    Aguilera, Eduardo; Villalba, Fabio

    1999-11-01

    Energy represents an essential element for economy, and for any sustainable development strategy, assuming it is a basic input for all production activities. It is a fundamental contra int for country's competitivity and also a main component of population's standard of life. The Agenda 21 and the General Agreement on Climatic Changes emphasize that the development and sustainable use of energy should promote economy, but taking care of the environment. Under these basic concepts, for the particular case of energy, the sustain ability of development requires the adoption of a strategy which guarantee an energy supply in terms of quality, opportunity, continuity and afford ability and, in addition, without production of negative environmental impacts. Geothermal energy is a serious energetic option for sustainable development, since presents technical and economic advantages for production of electricity at medium and large scale. Furthermore, geothermal energy allows a wide spectrum of direct applications of heat in profitable projects of high social impact as green houses, drying of seeds and wood products, fish farming, recreation and others. All of them can help the increase of communal production activities in rural areas affected by poverty

  12. Resilience and receptivity worked in tandem to sustain a geothermal mat community amidst erratic environmental conditions.

    Science.gov (United States)

    Ghosh, Wriddhiman; Roy, Chayan; Roy, Rimi; Nilawe, Pravin; Mukherjee, Ambarish; Haldar, Prabir Kumar; Chauhan, Neeraj Kumar; Bhattacharya, Sabyasachi; Agarwal, Atima; George, Ashish; Pyne, Prosenjit; Mandal, Subhrangshu; Rameez, Moidu Jameela; Bala, Goutam

    2015-07-17

    To elucidate how geothermal irregularities affect the sustainability of high-temperature microbiomes we studied the synecological dynamics of a geothermal microbial mat community (GMMC) vis-à-vis fluctuations in its environment. Spatiotemporally-discrete editions of a photosynthetic GMMC colonizing the travertine mound of a circum-neutral hot spring cluster served as the model-system. In 2010 a strong geyser atop the mound discharged mineral-rich hot water, which nourished a GMMC continuum from the proximal channels (PC) upto the slope environment (SE) along the mound's western face. In 2011 that geyser extinguished and consequently the erstwhile mats disappeared. Nevertheless, two relatively-weaker vents erupted in the southern slope and their mineral-poor outflow supported a small GMMC patch in the SE. Comparative metagenomics showed that this mat was a relic of the 2010 community, conserved via population dispersal from erstwhile PC as well as SE niches. Subsequently in 2012, as hydrothermal activity augmented in the southern slope, ecological niches widened and the physiologically-heterogeneous components of the 2011 "seed-community" split into PC and SE meta-communities, thereby reclaiming either end of the thermal gradient. Resilience of incumbent populations, and the community's receptiveness towards immigrants, were the key qualities that ensured the GMMC's sustenance amidst habitat degradation and dispersal to discrete environments.

  13. Hanford environmental dose reconstruction project - an overview

    International Nuclear Information System (INIS)

    Shipler, D.B.; Napier, B.A.; Farris, W.T.

    1996-01-01

    The Hanford Environmental Dose Reconstruction Project was initiated because of public interest in the historical releases of radioactive materials from the Hanford Site, located in southcentral Washington State. By 1986, over 38,000 pages of environmental monitoring documentation from the early years of Hanford operations had been released. Special committees reviewing the documents recommended initiation of the Hanford Environmental Dose Reconstruction Project, which began in October 1987, and is conducted by Battelle, Pacific Northwest Laboratories. The technical approach taken was to reconstruct releases of radioactive materials based on facility operating information; develop and/or adapt transport, pathway, and dose models and computer codes; reconstruct environmental, meterological, and hydrological monitoring information; reconstruct demographic, agricultural, and lifestyle characteristics; apply statistical methods to all forms of uncertainty in the information, parameters, and models; and perform scientific investigation that were technically defensible. The geographic area for the study includes ∼2 x 10 5 km 2 (75,000 mi 2 ) in eastern Washington, western Idaho, and northeastern Oregon (essentially the Mid-columbia Basin of the Pacific Northwest). Three exposure pathways were considered: the atmosphere, the Columbia River, and ground water

  14. A complementary geothermal application

    International Nuclear Information System (INIS)

    Bedard, R.

    1998-01-01

    A geothermal project for air conditioning and heating at four health centres in Quebec was presented. The four health centres are: le centre Dominique-Tremblay, le centre Cardinal-Villeneuve, le centre Louis-Hebert, et le centre Francois-Charon. The investment made to install the geothermal heating and cooling system, the cost of operating the system, and energy savings resulting from the investment were discussed

  15. Geothermal Injection Monitoring Project. Phase I status report, April 1981-April 1982

    Energy Technology Data Exchange (ETDEWEB)

    Younker, L.; Hanson, J.; Didwall, E.; Kasameyer, P.; Smith, A.; Hearst, J.; Daily, W.; Crow, N.; Younker, J.; Murray, W.

    1982-08-13

    The feasibility of using remote geophysical techniques to monitor the movement of injected brine has been evaluated. It was established that no single approach is likely to be identified that can be used to accurately monitor the precise location of the injected fluid. Several approaches have been considered in parallel because they add new dimensions to the existing monitoring capabilities, and are likely to cover a range of applications at a variety of geothermal sites. These include: microseismicity - a seismic net is used to record small magnitude events associated with injection; streaming potential - self potential anomalies produced by a moving fluid identify fluid flow direction; cross borehole geotomography - two-dimensional image of flow pathways is constructed using electromagnetic waves; and well pressure response to solid earth tide - changes in pore pressures are used to discriminate fracture/pore porosity and estimate fracture orientations.

  16. Waste diminution in Construction projects: Environmental Predicaments

    Science.gov (United States)

    Gharehbaghi, Koorosh; Scott-Young, Christina

    2018-03-01

    Waste diminution in construction projects is not only a behavioural issue, but also an energy consumption and reduction concern. With construction waste equating to the significant amount of exhausted energy together with increased pollution, this contributes to a series of environmental predicaments. The overall goal of construction solid Waste Management is to collect, treat and dispose of solid wastes generated by project activities in an environmentally and socially satisfactory manner, using the most economical means available. As cities expand, their construction activities and consumption patterns further drive up the solid waste quantities. Governments are usually authorized to have responsibility for providing solid Waste Management services, and various administrative laws give them exclusive ownership over the waste produced. In addition, construction waste processing can be further controlled and minimized according to specialized authorities such as Environmental Protection Agencies (EPA) and their relevant acts and regulations. Moreover, a Construction Environmental Management Plan (CEMP) can further control the treatment of waste and therefore, reduce the amount produced. Key elements of a CEMP not only include complying with relevant legislation, standards and guidance from the EPA; however, also to ensuring that there are systems in place to resolve any potential problems associated with site activities. Accordingly, as a part of energy consumption and lessening strategies, this paper will discuss various effective waste reduction methods for construction projects. Finally, this paper will also examine tactics to further improve energy efficiency through innovative construction Waste Management strategies (including desirability rating of most favourable options) to promote the lessening of overall CO2production.

  17. Atmosphere Resource Recovery & Environmental Monitoring for Long Duration Exploration Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The AES Atmosphere Resource Recovery & Environmental Monitoring (ARREM) for Long Duration Exploration Project project is maturing Atmosphere Revitalization...

  18. Melancthon Grey Wind Project environmental screening report

    International Nuclear Information System (INIS)

    2005-01-01

    Canadian Hydro has proposed that the Melancthon and Grey Highlands Townships in Dufferin County, Ontario are ideally suited for the installation of a 240 MW wind farm. Assuming a turbine rating of 1.5 MW each, a total of 160 turbines could be installed. The utility has decided to undertake the project in up to 4 phases. This paper focuses on the construction and operation of a 75 MW wind turbine array (50, 1.5 MW turbines) dispersed over an area of about 3,511 hectares in the Melancthon Township. The total expected cost of the first phase is $130 million, with construction scheduled to begin in April 2005 for an in-service date of no later than March 31, 2006 to meet the Wind Power Production Incentive (WPPI) funding requirements. This environmental screening report (ESR) was completed to help Canadian Hydro fulfill regulatory requirements. It presented the project summary, the estimated capacity of the wind farm, and construction schedule. The environmental setting was also presented along with power line routing. This ESR addressed issues that may impact surface and ground water quality, air quality, soil erosion, environmental noise and disposal of waste materials. Issues affecting migratory birds, agricultural resources, community characteristics, construction related traffic, public health, historical resources and viewscapes were also addressed. The general conclusion of the ESR is that the project can be constructed, operated and decommissioned in such a manner as to minimize potentially adverse effects on the environment while enhancing the positive effects both locally and provincially. Migratory bird deaths due to collision with turbines are expected to be negligible and the effects of breeding bird habitat have been minimized through proposed mitigation measures. Environmental noise levels are expected to be within the applicable noise criteria. There will be no negative effect on property values within the viewshed of the turbines. There are many net

  19. Environmental qualification program for Wolsong project

    International Nuclear Information System (INIS)

    Duggal, A.; Johal, H.; Yee, F.; Suh, S.K.

    1995-01-01

    The Wolsong EQ Program is a process that begins at the design concept stage and continues throughout the operating life of the station. As all components may not have a 30 year service life without periodic maintenance, the EQ Program becomes an important management tool for the owner of the plant. First, the environmental conditions are predicted for the postulated events. Next, suitably qualified equipment is specified and procured. Then the equipment is installed according to specific instructions. Finally, by means of ongoing maintenance and replacement of parts, the qualification of the equipment is maintained during the operating life of the plant. Proper documentation and traceability is required at all stages of the program. As defined in the Wolsong Project Environmental Qualification Design Guide a comprehensive Environmental Qualification (EQ) Program ensures that safety related equipment located in an area in which a harsh environment could occur, can function when required for the life of the station . This program was implemented at the beginning of the Wolsong project. Using this program, components/equipment are qualified prior to installation and a maintenance program is established to keep equipment 'qualified' throughout the station life

  20. Geothermal Loan Guaranty Program and its impact on geothermal exploration and development

    Energy Technology Data Exchange (ETDEWEB)

    Nasr, L.H.

    1978-05-01

    The study showed that the Geothermal Loan Guaranty Program has had only a negligible effect on geothermal development and the response to the program was far less than expected. The streamlining of environmental regulations and leasing policies, and the granting of intangible drilling cost write-offs and depletion allowances to operators would have had a greater impact on geothermal energy development. The loan guaranty program did not promote the undertaking of any new projects that would not have been undertaken without it. The program only accelerated the pace for some development which might have commenced in the future. Included in the study are recommendations for improving the operation of the program thereby increasing its attractiveness to potential applicants.

  1. UMTRA Project environmental, health, and safety plan

    International Nuclear Information System (INIS)

    1989-02-01

    The basic health and safety requirements established in this plan are designed to provide guidelines to be applied at all Uranium Mill Tailings Remedial Action (UMTRA) Project sites. Specific restrictions are given where necessary. However, an attempt has been made to provide guidelines which are generic in nature, and will allow for evaluation of site-specific conditions. Health and safety personnel are expected to exercise professional judgment when interpreting these guidelines to ensure the health and safety of project personnel and the general population. This UMTRA Project Environmental, Health, and Safety (EH ampersand S) Plan specifies the basic Federal health and safety standards and special DOE requirements applicable to this program. In addition, responsibilities in carrying out this plan are delineated. Some guidance on program requirements and radiation control and monitoring is also included. An Environmental, Health, and Safety Plan shall be developed as part of the remedial action plan for each mill site and associated disposal site. Special conditions at the site which may present potential health hazards will be described, and special areas that should should be addressed by the Remedial Action Contractor (RAC) will be indicated. Site-specific EH ampersand S concerns will be addressed by special contract conditions in RAC subcontracts. 2 tabs

  2. Water Use in Enhanced Geothermal Systems (EGS): Geology of U.S. Stimulation Projects, Water Costs, and Alternative Water Source Policies

    Energy Technology Data Exchange (ETDEWEB)

    Harto, C. B. [Argonne National Lab. (ANL), Argonne, IL (United States); Schroeder, J. N. [Argonne National Lab. (ANL), Argonne, IL (United States); Horner, R. M. [Argonne National Lab. (ANL), Argonne, IL (United States); Patton, T. L. [Argonne National Lab. (ANL), Argonne, IL (United States); Durham, L. A. [Argonne National Lab. (ANL), Argonne, IL (United States); Murphy, D. J. [Argonne National Lab. (ANL), Argonne, IL (United States); Clark, C. E. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2014-10-01

    According to the Energy Information Administration (EIA) of the U.S. Department of Energy (DOE), geothermal energy generation in the United States is projected to more than triple by 2040 (EIA 2013). This addition, which translates to more than 5 GW of generation capacity, is anticipated because of technological advances and an increase in available sources through the continued development of enhanced geothermal systems (EGSs) and low-temperature resources (EIA 2013). Studies have shown that air emissions, water consumption, and land use for geothermal electricity generation have less of an impact than traditional fossil fuel–based electricity generation; however, the long-term sustainability of geothermal power plants can be affected by insufficient replacement of aboveground or belowground operational fluid losses resulting from normal operations (Schroeder et al. 2014). Thus, access to water is therefore critical for increased deployment of EGS technologies and, therefore, growth of the geothermal sector. This paper examines water issues relating to EGS development from a variety of perspectives. It starts by exploring the relationship between EGS site geology, stimulation protocols, and below ground water loss, which is one of the largest drivers of water consumption for EGS projects. It then examines the relative costs of different potential traditional and alternative water sources for EGS. Finally it summarizes specific state policies relevant to the use of alternative water sources for EGS, and finally explores the relationship between EGS site geology, stimulation protocols, and below ground water loss, which is one of the largest drivers of water consumption for EGS projects.

  3. Geothermal spas

    International Nuclear Information System (INIS)

    Woodruff, J.L.; Takahashi, P.K.

    1990-01-01

    The spa business, part of the health and fitness industry that has sprung up in recent years, is highly successful world-wide. The most traditional type of spa is the geothermal spa, found in geothermal areas around the world. In Japan, for example, some 2,000 geothermal spas and resorts generate $6 billion annually. Hawaii has an ideal environment for geothermal spas, and several locations in the islands could supply warm mineral water for spa development. Hawaii receives about 6 million visitors annually, a high percentage of whom are familiar with the relaxing and therapeutic value of geothermal spas, virtually guaranteeing the success of this industry in Hawaii. Presently, Hawaii does not have a single geothermal spa. This paper reports that the geothermal spa business is an industry whose time has come, an industry that offers very promising investment opportunities, and one that would improve the economy while expanding the diversity of pleasurable vacation options in Hawaii

  4. Direct utilization of geothermal energy: a layman's guide. Geothermal Resources Council special report No. 8

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, D.N.; Lund, J.W. (eds.)

    1979-01-01

    The following subjects are covered: nature and distribution of geothermal energy; exploration, confirmation, and evaluation of the resource; reservoir development and management; utilization; economics of direct-use development; financing direct-use projects; and legal, institutional, and environmental aspects. (MHR)

  5. Utilization of geothermal energy in the mining and processing of tungsten ore. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Erickson, M.V.; Lacy, S.B.; Lowe, G.D.; Nussbaum, A.M.; Walter, K.M.; Willens, C.A.

    1981-01-01

    The engineering, economic, and environmental feasibility of the use of low and moderate temperature geothermal heat in the mining and processing of tungsten ore is explored. The following are covered: general engineering evaluation, design of a geothermal energy system, economics, the geothermal resource, the institutional barriers assessment, environmental factors, an alternate geothermal energy source, and alternates to geothermal development. (MHR)

  6. Uranium mining environmental restoration project (PRAMU)

    International Nuclear Information System (INIS)

    Asenjo, A.

    2002-01-01

    The National Atomic Energy Commission (CNEA) started its activities 50 years ago and obtained significant results. At the present time, the CNEA is defined as an Institution of research and development in the nuclear field. It is also responsible for the management of radioactive wastes and the dismantling of nuclear and radioactive facilities. Mining and milling activities have been carried out during the past 40 years and at present the CNEA is undertaking the Uranium Mining Environmental Restoration Project (PRAMU). The aim of this project is to restore the environment as much as is possible in all places where uranium mining and milling activities were developed when taking into consideration both economic and technical reality. First, the characteristics of the problems in each site are determined through appropriate studies which identify the existing or potential impacts, the possible pathways of contamination, etc. The sites being studied are: MALARGUE (Mendoza Province), CORDOBA (Cordoba Province), LOS GIGANTES (Cordoba Province), HUEMUL (Mendoza Province), PICHINAN (Chubut Province), TONCO (Salta Province), LA ESTELA (San Luis Province), LOS COLORADOS (La Rioja Province). PRAMU seeks to improve the current conditions of the tailings deposits and mines and to ensure the long term protection of people and the environment. The CNEA is required to comply with all legislation that is in force and is under the control of various national, provincial and local State institutions. The main objectives of the project for the various sites are: (a) Malargue site: to implement the actions necessary for environmental restoration and management of the tailings derived from the uranium ores processed in the industrial plant; (b) Cordoba and Los Gigantes sites: to design, engineer and execute the activities required for closure of the sites; (c) Other sites (Huemul, Pichinan, Tonco, La Estela, Los Colorados): to develop an environmental evaluation and, on the basis of

  7. Geothermal energy. A national proposal for geothermal resources research

    Energy Technology Data Exchange (ETDEWEB)

    Denton, J.C. (ed.)

    1972-01-01

    Discussions are given for each of the following topics: (1) importance to the Nation of geothermal resources, (2) budget recommendations, (3) overview of geothermal resources, (4) resource exploration, (5) resource assessment, (6) resource development and production, (7) utilization technology and economics, (8) environmental effects, (9) institutional considerations, and (10) summary of research needs.

  8. Bear Creek Project. Draft environmental statement

    International Nuclear Information System (INIS)

    1977-01-01

    The Bear Creek Project consists of mining and milling operations involving uranium ore deposits located in Converse County, Wyoming. Mining of uranium from six known ore bodies will take place over ten years; a 1000 tons ore/day will be constructed and operated as long as ore is available. The tailings will be stored onsite in an impoundment. The project would convert 2700 acres from grazing use to mining/milling activities for about ten years. Mining would disturb a total of 1600 acres but, because of reclamation, the max acreage disturbed at any one time would be about 1000 acres, the average being about 650 acres. Dose rates were computed for an individual in a ranch house at the nearest ranch. Conditions for the protection of the environment are proposed. Possible environmental impacts evaluated cover air, land, water, soil, vegetation, wildlife, and community. A benefit-cost analysis is made

  9. Bear Creek Project. Final environmental statement

    International Nuclear Information System (INIS)

    1977-06-01

    The Bear Creek Project consists of certain mining and milling operations involving uranium ore deposits located in Converse County, Wyoming. Mining of uranium from nine known ore bodies will take place over a period of ten years (estimated); a mill with a nominal capacity of 1000 tons per day of ore will be constructed and operated as long as ore is available. The waste material (tailings) from the mill, also produced at a rate of about 1000 tons per day, will be stored onsite in an impoundment. Environmental impacts and adverse effects are summarized

  10. Crossing the Barriers: An Analysis of Land Access Barriers to Geothermal Development and Potential Improvement Scenarios

    Energy Technology Data Exchange (ETDEWEB)

    Levine, Aaron L [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Young, Katherine R [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-10-04

    Developers have identified many non-technical barriers to geothermal power development, including access to land. Activities required for accessing land, such as environmental review and private and public leasing can take a considerable amount of time and can delay or prevent project development. This paper discusses the impacts to available geothermal resources and deployment caused by land access challenges, including tribal and cultural resources, environmentally sensitive areas, biological resources, land ownership, federal and state lease queues, and proximity to military installations. In this analysis, we identified challenges that have the potential to prevent development of identified and undiscovered hydrothermal geothermal resources. We found that an estimated 400 MW of identified geothermal resource potential and 4,000 MW of undiscovered geothermal resource potential were either unallowed for development or contained one or more significant barriers that could prevent development at the site. Potential improvement scenarios that could be employed to overcome these barriers include (1) providing continuous funding to the U.S. Forest Service (USFS) for processing geothermal leases and permit applications and (2) the creation of advanced environmental mitigation measures. The model results forecast that continuous funding to the USFS could result in deployment of an additional 80 MW of geothermal capacity by 2030 and 124 MW of geothermal capacity by 2050 when compared to the business-as-usual scenario. The creation of advanced environmental mitigation measures coupled with continuous funding to the USFS could result in deployment of an additional 97 MW of geothermal capacity by 2030 and 152 MW of geothermal capacity by 2050 when compared to the business-as-usual scenario. The small impact on potential deployment in these improvement scenarios suggests that these 4,400 MW have other barriers to development in addition to land access. In other words, simply

  11. Geothermal System Extensions

    Energy Technology Data Exchange (ETDEWEB)

    Gunnerson, Jon [Boise City Corporation, ID (United States); Pardy, James J. [Boise City Corporation, ID (United States)

    2017-09-30

    This material is based upon work supported by the Department of Energy under Award Number DE-EE0000318. The City of Boise operates and maintains the nation’s largest geothermal heating district. Today, 91 buildings are connected, providing space heating to over 5.5 million square feet, domestic water heating, laundry and pool heating, sidewalk snowmelt and other related uses. Approximately 300 million gallons of 177°F geothermal water is pumped annually to buildings and institutions located in downtown Boise. The closed loop system returns all used geothermal water back into the aquifer after heat has been removed via an Injection Well. Water injected back into the aquifer has an average temperature of 115°F. This project expanded the Boise Geothermal Heating District (Geothermal System) to bring geothermal energy to the campus of Boise State University and to the Central Addition Eco-District. In addition, this project also improved the overall system’s reliability and increased the hydraulic capacity.

  12. Water Desalination using geothermal energy

    KAUST Repository

    Goosen, M.

    2010-08-03

    The paper provides a critical overview of water desalination using geothermal resources. Specific case studies are presented, as well as an assessment of environmental risks and market potential and barriers to growth. The availability and suitability of low and high temperature geothermal energy in comparison to other renewable energy resources for desalination is also discussed. Analysis will show, for example, that the use of geothermal energy for thermal desalination can be justified only in the presence of cheap geothermal reservoirs or in decentralized applications focusing on small-scale water supplies in coastal regions, provided that society is able and willing to pay for desalting. 2010 by the authors; licensee MDPI, Basel, Switzerland.

  13. Geothermal Energy: Prospects and Problems

    Science.gov (United States)

    Ritter, William W.

    1973-01-01

    An examination of geothermal energy as a means of increasing the United States power resources with minimal pollution problems. Developed and planned geothermal-electric power installations around the world, capacities, installation dates, etc., are reviewed. Environmental impact, problems, etc. are discussed. (LK)

  14. Sacramento Municipal Utility District Geothermal Power Plant, SMUDGEO No. 1. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1981-02-01

    The proposed construction of 72-MW geothermal power plant is discussed. The following aspects are covered: the project as proposed by the utility; the environmental setting; the adverse consequences of the project, any significant environmental effects which cannot be avoided, and any mitigation measures to minimize significant effects; the potential feasible alternatives to the proposed project; the significant unavoidable, irreversible, and long-term environmental impacts; and the Growth Inducing Impacts. (MHR)

  15. Final rapid reactivation project environmental assessment

    International Nuclear Information System (INIS)

    1999-01-01

    The US Department of Energy (DOE) has prepared an environmental assessment (EA) for the Rapid Reactivation Project at Sandia National Laboratories, New Mexico. The EA analyzes the potential effects of a proposal to increase production of neutron generators from the current capability of 600 units per year up to 2,000 units per year. The project would use existing buildings and infrastructure to the maximum extent possible to meet the additional production needs. The increased production levels would necessitate modifications and additions involving a total area of approximately 26,290 gross square feet at Sandia National Laboratories, New Mexico, Technical Area 1. Additional production equipment would be procured and installed. The no-action alternative would be to continue production activities at the current capability of 600 units per year. The EA analyzes effects on health, safety, and air quality, resulting from construction and operation and associated cumulative effects. A detailed description of the proposed action and its environmental consequences is presented in the EA

  16. Environmental impacts associated with Project Rio Blanco

    International Nuclear Information System (INIS)

    Alldredge, A.W.; Whicker, F.W.; Hanson, W.C.

    Project Rio Blanco, an experiment involving deep underground detonation of three 30-kton nuclear explosives designed to stimulate natural gas flow in geologic formations of low permeability, was conducted in western Colorado on 17 May 1973. Environmental impacts associated with this experiment were divided into three categories: radiation, ground motion, and conventional physical activities. Radiation and ground motion are unique to this type experiment while conventional activities would be associated with any type of resource development. The objective of observations made at Rio Blanco was to qualitatively and, where possible, quantitatively ascertain environmental impacts associated with the project. Observations indicated that ground motion and conventional activities appeared to cause the greatest impacts. Ground motion impacts were most severe within 2.4 km of the emplacement well (EW) and were predominantly associated with steep ravine and stream banks and rocky cliffs. Following the detonation, flow and turbidity had increased in a small stream adjacent to the EW. Animals receiving deleterious impacts were those associated with stream banks, cliffs and burrows. No mortality or injury was observed in any large animals. (U.S.)

  17. A multi-objective optimization approach for the selection of working fluids of geothermal facilities: Economic, environmental and social aspects.

    Science.gov (United States)

    Martínez-Gomez, Juan; Peña-Lamas, Javier; Martín, Mariano; Ponce-Ortega, José María

    2017-12-01

    The selection of the working fluid for Organic Rankine Cycles has traditionally been addressed from systematic heuristic methods, which perform a characterization and prior selection considering mainly one objective, thus avoiding a selection considering simultaneously the objectives related to sustainability and safety. The objective of this work is to propose a methodology for the optimal selection of the working fluid for Organic Rankine Cycles. The model is presented as a multi-objective approach, which simultaneously considers the economic, environmental and safety aspects. The economic objective function considers the profit obtained by selling the energy produced. Safety was evaluated in terms of individual risk for each of the components of the Organic Rankine Cycles and it was formulated as a function of the operating conditions and hazardous properties of each working fluid. The environmental function is based on carbon dioxide emissions, considering carbon dioxide mitigation, emission due to the use of cooling water as well emissions due material release. The methodology was applied to the case of geothermal facilities to select the optimal working fluid although it can be extended to waste heat recovery. The results show that the hydrocarbons represent better solutions, thus among a list of 24 working fluids, toluene is selected as the best fluid. Copyright © 2017 Elsevier Ltd. All rights reserved.

  18. China starts tapping rich geothermal resources

    Science.gov (United States)

    Guang, D.

    1980-09-01

    Attention is given to the electric and power installation running on geothermal energy at Yangbajain, Tibet. Other geothermal projects in Tibet, the Yunnan Province and the North China Plain are also outlined. Applications of geothermal energy are described, including the heating of homes and factories, spinning, weaving, paper-making and the making of wine.

  19. Griffith energy project draft environmental impact statement

    International Nuclear Information System (INIS)

    1998-10-01

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fired, combined cycle power plant, on private lands south of Kingman, Arizona. The Project would be a merchant plant which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. The existing environmental resource conditions in the Project area and the potential impacts on the resources by the proposed action and alternatives are described. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management

  20. Final environmental impact report. Part I. Pacific Gas and Electric Company Geysers Unit 16, Geothermal Power Plant, Lake County, California

    Energy Technology Data Exchange (ETDEWEB)

    1981-03-01

    The environmental analysis includes the following: geology, soils, hydrology, water quality, vegetation, wildlife, air resources, health and safety, noise, waste management, cultural resources, land use, aesthetics, socioeconomics, public services, transportation, and energy and material resources. Also included are: the project description, a summary of environmental consequences, and alternatives to the proposed action. (MHR)

  1. Proceedings of the Conference on Research for the Development of Geothermal Energy Resources

    Science.gov (United States)

    1974-01-01

    The proceedings of a conference on the development of geothermal energy resources are presented. The purpose of the conference was to acquaint potential user groups with the Federal and National Science Foundation geothermal programs and the method by which the users and other interested members can participate in the program. Among the subjects discussed are: (1) resources exploration and assessment, (2) environmental, legal, and institutional research, (3) resource utilization projects, and (4) advanced research and technology.

  2. Research on the availability and environmental aspects of geothermal electric power plants in Mexico

    International Nuclear Information System (INIS)

    Mulas, P.; Mercado, S.

    1984-01-01

    Although geothermal electric power plants will make only a modest contribution to annual power generation in Mexico until the year 2000 (at present there is a capacity of 205 MW(e) in operation and 440 MW(e) under construction), new areas are being developed and, in the plants that have been in operation for several years, criteria such as the capacity factor (>85%) and the cost per kW.h generated are favourable. The main problem lies in determining the generation capacity which should be installed at the end of the exploration period. There is an economic risk here since the generation capacity is extremely uncertain and in order to reduce this risk the well production record must be carefully studied. Considerable research is being carried out in this area to improve the physical and numerical techniques available. Research is also being conducted to improve the cementing quality of the well pipes and to try to prevent or eliminate corrosion of these pipes. Study of the problem of silica incrustation has led to the adoption of economic techniques for its prevention or removal. Possibilities for the commercial utilization of waste have been studied for brine and are about to be started for gases. Heat exchangers which could turn the heat at present being wasted to account for electricity generation are also being investigated. (author)

  3. Geothermal engineering fundamentals and applications

    CERN Document Server

    Watson, Arnold

    2013-01-01

    This book explains the engineering required to bring geothermal resources into use. The book covers specifically engineering aspects that are unique to geothermal engineering, such as measurements in wells and their interpretation, transport of near-boiling water through long pipelines, turbines driven by fluids other than steam, and project economics. The explanations are reinforced by drawing comparisons with other energy industries.

  4. The Neustadt-Glewe geothermal project - problems and experience during operation; Das Geothermieprojekt Neustadt-Glewe - Probleme und Erfahrungen mit einer laufenden Anlage

    Energy Technology Data Exchange (ETDEWEB)

    Menzel, H [Erdwaerme Neustadt-Glewe GmbH (Germany)

    1997-12-01

    The scope and goals of the project and the principle of the Neustadt-Glewe geothermal system are presented. The system was commissioned in February 1995, so that sufficient performance data and availability information are now available. Problems that occurred are described and analyzed. Preliminary analyses of the consumption-dependent cost and cost distribution provide a basis for statements on the economic efficiency of geothermal projects. (orig.) [Deutsch] Es werden Inhalt und Ziel des Projektes, sowie das Prinzip der Geothermienutzung in Neustadt-Glewe kurz dargestellt. Nachdem die Anlage im Februar 1995 in Betrieb ging, koennen erste Betriebsergebnisse und Zuverlaessigkeitsaussagen gegeben werden. Es werden Probleme beim Betrieb der Anlagen geschildert und analysiert. Erste Analysen fuer die verbrauchsabhaengigen Kosten und die Kostenverteilung bilden die Grundlage fuer Aussagen zur Wirtschaftlichkeit derartiger Projekte. (orig.)

  5. Bangladesh Agro-Climatic Environmental Monitoring Project

    Science.gov (United States)

    Vermillion, C.; Maurer, H.; Williams, M.; Kamowski, J.; Moore, T.; Maksimovich, W.; Obler, H.; Gilbert, E.

    1988-01-01

    The Agro-Climatic Environmental Monitoring Project (ACEMP) is based on a Participating Agency Service Agreement (PASA) between the Agency for International Development (AID) and the National Oceanic and Atmospheric Administration (NOAA). In FY80, the Asia Bureau and Office of Federal Disaster Assistance (OFDA), worked closely to develop a funding mechanism which would meet Bangladesh's needs both for flood and cyclone warning capability and for application of remote sensing data to development problems. In FY90, OFDA provided for a High Resolution Picture Transmission (HRPT) receiving capability to improve their forecasting accuracy for cyclones, flooding and storm surges. That equipment is primarily intended as a disaster prediction and preparedness measure. The ACEM Project was designed to focus on the development applications of remote sensing technology. Through this Project, AID provided to the Bangladesh Government (BDG) the equipment, technical assistance, and training necessary to collect and employ remote sensing data made available by satellites as well as hydrological data obtained from data collection platforms placed in major rivers. The data collected will enable the BDG to improve the management of its natural resources.

  6. Daemen Alternative Energy/Geothermal Technologies Demonstration Program, Erie County

    Energy Technology Data Exchange (ETDEWEB)

    Beiswanger, Robert C. [Daemen College, Amherst, NY (United States)

    2013-02-28

    The purpose of the Daemen Alternative Energy/Geothermal Technologies Demonstration Project is to demonstrate the use of geothermal technology as model for energy and environmental efficiency in heating and cooling older, highly inefficient buildings. The former Marian Library building at Daemen College is a 19,000 square foot building located in the center of campus. Through this project, the building was equipped with geothermal technology and results were disseminated. Gold LEED certification for the building was awarded. 1) How the research adds to the understanding of the area investigated. This project is primarily a demonstration project. Information about the installation is available to other companies, organizations, and higher education institutions that may be interested in using geothermal energy for heating and cooling older buildings. 2) The technical effectiveness and economic feasibility of the methods or techniques investigated or demonstrated. According to the modeling and estimates through Stantec, the energy-efficiency cost savings is estimated at 20%, or $24,000 per year. Over 20 years this represents $480,000 in unrestricted revenue available for College operations. See attached technical assistance report. 3) How the project is otherwise of benefit to the public. The Daemen College Geothermal Technologies Ground Source Heat Pumps project sets a standard for retrofitting older, highly inefficient, energy wasting and environmentally irresponsible buildings that are quite typical of many of the buildings on the campuses of regional colleges and universities. As a model, the project serves as an energy-efficient system with significant environmental advantages. Information about the energy-efficiency measures is available to other colleges and universities, organizations and companies, students, and other interested parties. The installation and renovation provided employment for 120 individuals during the award period. Through the new Center

  7. Geothermal energy

    OpenAIRE

    Manzella A.

    2017-01-01

    Geothermal technologies use renewable energy resources to generate electricity and direct use of heat while producing very low levels of greenhouse-gas (GHG) emissions. Geothermal energy is the thermal energy stored in the underground, including any contained fluid, which is available for extraction and conversion into energy products. Electricity generation, which nowadays produces 73.7 TWh (12.7 GW of capacity) worldwide, usually requires geothermal resources temperatures of over 100 °C. Fo...

  8. Geothermal energy

    International Nuclear Information System (INIS)

    Le Du, H.; Bouchot, V.; Lopez, S.; Bialkowski, A.; Colnot, A.; Rigollet, C.; Sanjuan, B.; Millot, R.; Brach, M.; Asmundsson, R.; Giroud, N.

    2010-01-01

    Geothermal energy has shown a revival for several years and should strongly develop in a near future. Its potentiality is virtually unexhaustible. Its uses are multiple and various: individual and collective space heating, heat networks, power generation, heat storage, heat exchanges etc.. Re-launched by the demand of renewable energy sources, geothermal energy has become credible thanks to the scientific works published recently which have demonstrated its economical and technical relevance. Its image to the public is changing as well. However, lot of work remains to do to make geothermal energy a real industry in France. Several brakes have to be removed rapidly which concern the noise pollution of geothermal facilities, the risk of bad results of drillings, the electricity costs etc. This dossier gives an overview of today's main research paths in the domain of geothermal energy: 1 - geothermal energy in France: historical development, surface and deep resources, ambitions of the French national energy plan (pluri-annual investment plan for heat generation, incentives, regional 'climate-air-energy' schemes), specific regulations; 2 - geothermal energy at the city scale - sedimentary basins: Ile-de-France 40 years of Dogger reservoir exploitation, potentialities of clastic reservoirs - the Chaunoy sandstones example; 3 - geothermal power generation: conventional reservoirs - the Bouillante model (Guadeloupe, French Indies); the Soultz-sous-Forets pilot plant (Bas-Rhin, France); the supercritical reservoirs - the Krafla geothermal area (Iceland). (J.S.)

  9. Environmental Science: 49 Science Fair Projects. Science Fair Projects Series.

    Science.gov (United States)

    Bonnet, Robert L.; Keen, G. Daniel

    This book contains 49 science fair projects designed for 6th to 9th grade students. Projects are organized by the topics of soil, ecology (projects in habitat and life cycles), pests and controls (projects in weeds and insects), recycling (projects in resources and conservation), waste products (projects in decomposition), microscopic organisms,…

  10. New energy technologies 3 - Geothermal and biomass energies

    International Nuclear Information System (INIS)

    Sabonnadiere, J.C.; Alazard-Toux, N.; His, S.; Douard, F.; Duplan, J.L.; Monot, F.; Jaudin, F.; Le Bel, L.; Labeyrie, P.

    2007-01-01

    This third tome of the new energy technologies handbook is devoted to two energy sources today in strong development: geothermal energy and biomass fuels. It gives an exhaustive overview of the exploitation of both energy sources. Geothermal energy is presented under its most common aspects. First, the heat pumps which encounter a revival of interest in the present-day context, and the use of geothermal energy in collective space heating applications. Finally, the power generation of geothermal origin for which big projects exist today. The biomass energies are presented through their three complementary aspects which are: the biofuels, in the hypothesis of a substitutes to fossil fuels, the biogas, mainly produced in agricultural-type facilities, and finally the wood-fuel which is an essential part of biomass energy. Content: Forewords; geothermal energy: 1 - geothermal energy generation, heat pumps, direct heat generation, power generation. Biomass: 2 - biofuels: share of biofuels in the energy context, present and future industries, economic and environmental status of biofuel production industries; 3 - biogas: renewable natural gas, involuntary bio-gases, man-controlled biogas generation, history of methanation, anaerobic digestion facilities or biogas units, biogas uses, stakes of renewable natural gas; 4 - energy generation from wood: overview of wood fuels, principles of wood-energy conversion, wood-fueled thermal energy generators. (J.S.)

  11. Profitability Evaluation of a Hybrid Geothermal and CO2 Sequestration Project for a Coastal Hot Saline Aquifer.

    Science.gov (United States)

    Plaksina, Tatyana; Kanfar, Mohammed

    2017-11-01

    With growing interest in commercial projects involving industrial volume CO2 sequestration, a concern about proper containment and control over the gas plume becomes particularly prominent. In this study, we explore the potential of using a typical coastal geopressured hot saline aquifer for two commercial purposes. The first purpose is to harvest geothermal heat of the aquifer for electricity generation and/or direct use and the second one is to utilize the same rock volume for safe and controlled CO2 sequestration without interruption of heat production. To achieve these goals, we devised and economically evaluated a scheme that recovers operational and capital costs within first 4 years and yields positive internal rate of return of about 15% at the end of the operations. Using our strategic design of well placement and operational scheduling, we were able to achieve in our numerical simulation study the following results. First, the hot water production rates allowed to run a 30 MW organic Rankine cycle plant for 20 years. Second, during the last 10 years of operation we managed to inject into the same reservoir (volume of 0.8 x 109 m3) approximately 10 million ton of the supercritical gas. Third, decades of numerical monitoring the plume after the end of the operations showed that this large volume of CO2 is securely sequestrated inside the reservoir without compromising the caprock integrity.

  12. Profitability Evaluation of a Hybrid Geothermal and CO2 Sequestration Project for a Coastal Hot Saline Aquifer.

    Directory of Open Access Journals (Sweden)

    Plaksina Tatyana

    2017-01-01

    Full Text Available With growing interest in commercial projects involving industrial volume CO2 sequestration, a concern about proper containment and control over the gas plume becomes particularly prominent. In this study, we explore the potential of using a typical coastal geopressured hot saline aquifer for two commercial purposes. The first purpose is to harvest geothermal heat of the aquifer for electricity generation and/or direct use and the second one is to utilize the same rock volume for safe and controlled CO2 sequestration without interruption of heat production. To achieve these goals, we devised and economically evaluated a scheme that recovers operational and capital costs within first 4 years and yields positive internal rate of return of about 15% at the end of the operations. Using our strategic design of well placement and operational scheduling, we were able to achieve in our numerical simulation study the following results. First, the hot water production rates allowed to run a 30 MW organic Rankine cycle plant for 20 years. Second, during the last 10 years of operation we managed to inject into the same reservoir (volume of 0.8 x 109 m3 approximately 10 million ton of the supercritical gas. Third, decades of numerical monitoring the plume after the end of the operations showed that this large volume of CO2 is securely sequestrated inside the reservoir without compromising the caprock integrity.

  13. A case study of radial jetting technology for enhancing geothermal energy systems at Klaipeda geothermal demonstration plant

    NARCIS (Netherlands)

    Nair, R.; Peters, E.; Sliaupa, S.; Valickas, R.; Petrauskas, S.

    2017-01-01

    In 1996 a geothermal energy project was initiated at Klaipėda, Lithuania, to demonstrate the feasibility of using low enthalpy geothermal water as a renewable energy resource in district heating systems. The Klaipėda geothermal plant is situated within the West Lithuanian geothermal anomaly with a

  14. Environmentally Preferable Coatings for Structural Steel Project

    Science.gov (United States)

    Lewis, Pattie L. (Editor)

    2014-01-01

    The Ground Systems Development and Operations (GSDO) Program at NASA John F. Kennedy Space Center (KSC) has the primary objective of modernizing and transforming the launch and range complex at KSC to benefit current and future NASA programs along with other emerging users. Described a the "launch support and infrastructure modernization program" in the NASA Authorization Act of 2010, the GSDO Program will develop and implement shared infrastructure and process improvements to provide more flexible, affordable, and responsive capabilities to a multi-user community. In support of the GSDO Program, the objective of this project is to determine the feasibility of environmentally friendly corrosion resistant coatings for launch facilities and ground support equipment. The focus of the project is corrosion resistance and survivability with the goal to reduce the amount of maintenance required to preserve the performance of launch facilities while reducing mission risk. Number of facilities/structures with metallic structural and non-structural components in a highly corrosive environment. Metals require periodic maintenance activity to guard against the insidious effects of corrosion and thus ensure that structures meet or exceed design or performance life. The standard practice for protecting metallic substrates in atmospheric environments is the application of corrosion protective coating system.

  15. Geothermal systems: Principles and case histories

    Science.gov (United States)

    Rybach, L.; Muffler, L. J. P.

    The classification of geothermal systems is considered along with the geophysical and geochemical signatures of geothermal systems, aspects of conductive heat transfer and regional heat flow, and geothermal anomalies and their plate tectonic framework. An investigation of convective heat and mass transfer in hydrothermal systems is conducted, taking into account the mathematical modelling of hydrothermal systems, aspects of idealized convective heat and mass transport, plausible models of geothermal reservoirs, and preproduction models of hydrothermal systems. Attention is given to the prospecting for geothermal resources, the application of water geochemistry to geothermal exploration and reservoir engineering, heat extraction from geothermal reservoirs, questions of geothermal resource assessment, and environmental aspects of geothermal energy development. A description is presented of a number of case histories, taking into account the low enthalpy geothermal resource of the Pannonian Basin in Hungary, the Krafla geothermal field in Northeast Iceland, the geothermal system of the Jemez Mountains in New Mexico, and extraction-reinjection at the Ahuachapan geothermal field in El Salvador.

  16. Geothermal Energy Geopressure Subprogram: DOE Lafourche Crossing No. 1, Terrebonne Parish and Lafourche Parish, Louisiana: Environmental assessment

    Energy Technology Data Exchange (ETDEWEB)

    1978-10-01

    The proposed action will consist of drilling one geothermal fluid well for intermittent production testing of 284 days over a three year period. Two disposal wells will initially be drilled to provide disposal of lower volume fluids produced during initial testing. Two additional disposal wells will be drilled, logged, completed, tested, and operated prior to commencement of high volume fluid production. Construction of the proposed action will change the land-use of 2 ha (5 ac) for the test well and each of the injection wells from agriculture or wetlands to resource exploration. Lands will be cleared and erosion and runoff will result. During operation of the well test, the only expected impacts are from venting of gases or flaring of gases and noise. After the tests are completed, the area will be restored as much as possible to its natural condition by revegetation programs using nature species. All sources of pollutants will be collected and disposed in environmentally acceptable ways. Accidents may result from this proposed action.

  17. Environmental assessment: geothermal energy geopressure subprogram. DOE Sweet Lake No. 1, Cameron Parish, Louisiana

    Energy Technology Data Exchange (ETDEWEB)

    1980-02-01

    The following are described: the proposed action; existing environment; probable impacts, direct and indirect; probable cumulative and long-term environmental impacts; accidents; coordination with federal, state, and local agencies; and alternatives. (MHR)

  18. Water Desalination using geothermal energy

    KAUST Repository

    Goosen, M.; Mahmoudi, H.; Ghaffour, NorEddine

    2010-01-01

    The paper provides a critical overview of water desalination using geothermal resources. Specific case studies are presented, as well as an assessment of environmental risks and market potential and barriers to growth. The availability

  19. Washington: a guide to geothermal energy development

    Energy Technology Data Exchange (ETDEWEB)

    Bloomquist, R.G.; Basescu, N.; Higbee, C.; Justus, D.; Simpson, S.

    1980-06-01

    Washington's geothermal potential is discussed. The following topics are covered: exploration, drilling, utilization, legal and institutional setting, and economic factors of direct use projects. (MHR)

  20. Geothermal resource areas database for monitoring the progress of development in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Lawrence, J.D.; Lepman, S.R.; Leung, K.; Phillips, S.L.

    1981-01-01

    The Geothermal Resource Areas Database (GRAD) and associated data system provide broad coverage of information on the development of geothermal resources in the United States. The system is designed to serve the information requirements of the National Progress Monitoring System. GRAD covers development from the initial exploratory phase through plant construction and operation. Emphasis is on actual facts or events rather than projections and scenarios. The selection and organization of data are based on a model of geothermal development. Subjects in GRAD include: names and addresses, leases, area descriptions, geothermal wells, power plants, direct use facilities, and environmental and regulatory aspects of development. Data collected in the various subject areas are critically evaluated, and then entered into an on-line interactive computer system. The system is publically available for retrieval and use. The background of the project, conceptual development, software development, and data collection are described here. Appendices describe the structure of the database in detail.

  1. Geothermal energy in Denmark. The Committee for Geothermal Energy of the Danish Energy Agency

    International Nuclear Information System (INIS)

    1998-06-01

    The Danish Energy Agency has prepared a report on the Danish geothermal resources and their contribution to the national energy potential.Environmental and socio-economic consequences of geothermal power systems implementation are reviewed. Organizational models and financing of geothermal-seismic research are discussed, and the Committee of the Energy Agency for Geothermal Energy recommends financing of a pilot plant as well as a prompt elucidation of concession/licensing problems. (EG)

  2. Geothermal Technologies Program: Direct Use

    Energy Technology Data Exchange (ETDEWEB)

    2004-08-01

    This general publication describes geothermal direct use systems, and how they have been effectively used throughout the country. It also describes the DOE program R&D efforts in this area, and summarizes several projects using direct use technology.

  3. Issues related to geothermal development

    International Nuclear Information System (INIS)

    Lesperance, G.O.

    1990-01-01

    This paper reports on a number of potential barriers to geothermal development in Hawaii which have been overcome but some remain. Efforts continue to address issues relating to transmission, project economics, the regulatory process, resource verification, and public acceptance

  4. Phase I Archaeological Investigation Cultural Resources Survey, Hawaii Geothermal Project, Makawao and Hana Districts, South Shore of Maui, Hawaii (DRAFT )

    Energy Technology Data Exchange (ETDEWEB)

    Erkelens, Conrad

    1994-03-01

    . Charcoal, molluscan and fish remains, basalt tools, and other artifacts were recovered. This material, while providing an extremely small sample, will greatly enhance our understanding of the use of the area. Recommendations regarding the need for further investigation and the preservation of sites within the project corridor are suggested. All sites within the project corridor must be considered potentially significant at this juncture. Further archaeological investigation consisting of a full inventory survey will be required prior to a final assessment of significance for each site and the development of a mitigation plan for sites likely to be impacted by the Hawaii Geothermal Project.

  5. Hanford Environmental Dose Reconstruction Project monthly report, August 1992

    International Nuclear Information System (INIS)

    McMakin, A.H.; Cannon, S.D.; Finch, S.M.

    1992-01-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demography; food consumption; and agriculture; and environmental pathway and dose estimates

  6. Geophysical considerations of geothermics

    Energy Technology Data Exchange (ETDEWEB)

    Hayakawa, M

    1967-01-01

    The development and utilization of geothermal energy is described from the standpoint of geophysics. The internal temperature of the Earth and the history and composition of magmas are described. Methods of exploration such as gravity, magnetic, thermal and electrical surveys are discussed, as are geochemical and infrared photogrammetric techniques. Examples are provided of how these techniques have been used in Italy and at the Matsukawa geothermal field in Japan. Drilling considerations such as muds, casings and cementing materials are discussed. Solutions are proposed for problems of environmental pollution and plant expansion.

  7. Geothermal heat pump

    International Nuclear Information System (INIS)

    Bruno, R.; Tinti, F.

    2009-01-01

    In recent years, for several types of buildings and users, the choice of conditioning by heat pump and low enthalpy geothermal reservoir has been increasing in the Italian market. In fact, such systems are efficient in terms of energy and consumption, they can perform, even at the same time, both functions, heating and cooling and they are environmentally friendly, because they do not produce local emissions. This article will introduce the technology and will focus on critical points of a geothermal field design, from actual practice, to future perspectives for the geo exchanger improvement. Finally, the article presents a best practice case in Bologna district, with an economic analysis showing the convenience of a geothermal heat pump. Conclusions of the real benefits of these plants can be drawn: compared to a non-negligible initial cost, the investment has a pay-back period almost always acceptable, usually less than 10 years. [it

  8. Research status of geothermal resources in China

    Science.gov (United States)

    Zhang, Lincheng; Li, Guang

    2017-08-01

    As the representative of the new green energy, geothermal resources are characterized by large reserve, wide distribution, cleanness and environmental protection, good stability, high utilization factor and other advantages. According to the characteristics of exploitation and utilization, they can be divided into high-temperature, medium-temperature and low-temperature geothermal resources. The abundant and widely distributed geothermal resources in China have a broad prospect for development. The medium and low temperature geothermal resources are broadly distributed in the continental crustal uplift and subsidence areas inside the plate, represented by the geothermal belt on the southeast coast, while the high temperature geothermal resources concentrate on Southern Tibet-Western Sichuan-Western Yunnan Geothermal Belt and Taiwan Geothermal Belt. Currently, the geothermal resources in China are mainly used for bathing, recuperation, heating and power generation. It is a country that directly makes maximum use of geothermal energy in the world. However, China’s geothermal power generation, including installed generating capacity and power generation capacity, are far behind those of Western European countries and the USA. Studies on exploitation and development of geothermal resources are still weak.

  9. The Campi Flegrei Deep Drilling Project: using borehole measurements to discriminate magmatic and geothermal effects in caldera unrest

    Science.gov (United States)

    De Natale, Giuseppe; Troise, Claudia; Carlino, Stefano; Troiano, Antonio; Giulia Di Giuseppe, Maria; Piochi, Monica; Somma, Renato; Tramelli, Anna; Kilburn, Christopher

    2015-04-01

    Large calderas are potentially the most risky volcanic areas in the world since they are capable of producing huge eruptions whose major effects can involve human life and activities from regional to global scale. Calderas worldwide are characterized by frequent episodes of unrest which, only in few cases, culminate with eruptions. This ambiguous behavior is generally explained in terms of magma intrusion or disturbance of geothermal fluids in the shallow crust, which are both source of ground deformations and seismicity. A major goal is to determine the relative contribution of each process, because the potential for eruptions significantly enhanced if magma movements emerge as the primary component. A very important case study is the active Campi Flegrei caldera, hosting part of the large city of Naples (Southern Italy). In the framework of the Campi Flegrei Deep Drilling Project new filed data from pilot borehole have been recorded (permeability and in situ stress) by using a novel procedure of Leak Off Test. These new data, particularly the actual permeability, are fundamental to calibrate the caldera unrest models at Campi Flegrei and, , to put constrains to forecast the maximum future eruptive scenario. We show here that these new data, integrated by fluid-dynamical modeling, allow to assess that only about a third of the maximum uplift recorded in 1982-1984 may be due to shallow aquifer perturbation, so that the remaining part should be due to magma inflow, corresponding to about 0.05 Km3 of new magma if we assume a sill-like reservoir located at 4 km of depth. Considering an almost equivalent magma inflow for the 1969-1972 unrest, which showed a similar uplift, we got a total magma inflow of 0.1 Km3. It is then very important to assess the times for cooling of such accumulated magma, in order to assess the eruption hazard.

  10. Uranium Mill Tailings Remedial Action Project 1993 Environmental Report

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    This annual report documents the Uranium Mill Tailing Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1993, surface remedial action was complete at 10 of the 24 designated UMTRA Project processing sites. In 1993 the UMTRA Project office revised the UMTRA Project Environmental Protection Implementation Plan, as required by the US DOE. Because the UMTRA Project sites are in different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  11. Uranium Mill Tailings Remedial Action Project 1993 Environmental Report

    International Nuclear Information System (INIS)

    1994-10-01

    This annual report documents the Uranium Mill Tailing Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1993, surface remedial action was complete at 10 of the 24 designated UMTRA Project processing sites. In 1993 the UMTRA Project office revised the UMTRA Project Environmental Protection Implementation Plan, as required by the US DOE. Because the UMTRA Project sites are in different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments

  12. Geothermal energy

    International Nuclear Information System (INIS)

    Lemale, J.

    2009-01-01

    The geothermal energy, listed among the new and renewable energy sources, is characterized by a huge variety of techniques and applications. This book deals with the access to underground geothermal resources and with their energy valorization as well. After a presentation of the main geological, hydrogeological and thermal exploitation aspects of this resource, the book presents the different geothermal-related industries in detail, in particular the district heating systems, the aquifer-based heat pumps, the utilizations in the agriculture, fishery and balneology sectors, and the power generation. (J.S.)

  13. Geothermal Heat Pump System for New Student Housing Project at the University at Albany Main Campus

    Energy Technology Data Exchange (ETDEWEB)

    Lnu, Indumathi [Univ. of Albany, NY (United States)

    2015-08-27

    University at Albany successfully designed, constructed and is operating a new student housing building that utilizes ground source heat pump (GSHP) for heating and cooling the entire 191,500SF building. The installed system consists of a well field with 150 bores, 450 feet deep and (189) terminal heat pump units for a total capacity of 358 Tons cooling and 4,300 MBtu/h heating. The building opened in Fall 2012. The annual energy use and cost intensity of the building, after the changes made during the first 2 years’ of operation is 57kBtu/SF/Year and $1.30/SF/Year respectively. This is approximately 50% lower than the other residential quads on campus, despite the fact that the quads are not air-conditioned. The total project cost from design through 3-years of operations is approximately $6 Million, out of which $5.7 Million is for construction of the GSHP system including the well field. The University received a $2.78 Million grant from the Department of Energy. The estimated utility cost savings, compared to a baseline building with conventional HVAC system, is approximately $185,000. The estimated simple payback, after grant incentives, is 15 years. Additionally, the project has created 8.5FTE equivalent jobs.

  14. Preliminary environmental assessment of selected geopressured - geothermal prospect areas: Louisiana Gulf Coast Region. Volume II. Environmental baseline data

    Energy Technology Data Exchange (ETDEWEB)

    Newchurch, E.J.; Bachman, A.L.; Bryan, C.F.; Harrison, D.P.; Muller, R.A.; Newman, J.P. Jr.; Smith, C.G. Jr.; Bailey, J.I. Jr.; Kelly, G.G.; Reibert, K.C.

    1978-10-15

    A separate section is presented for each of the six prospect areas studied. Each section includes a compilation and discussion of environmental baseline data derived from existing sources. The data are arranged as follows: geology and geohydrology, air quality, water resources and flood hazards, ecological systems, and land use. When data specific to the prospect were not available, regional data are reported. (MHR)

  15. Prognostic simulation of reinjection-research project geothermal site Neustadt-Glewe/Germany

    Energy Technology Data Exchange (ETDEWEB)

    Poppei, J. [Geothermie Neubrandenburg GmbH (Germany)

    1995-03-01

    For the first time after political and economical changes in Germany a hydrothermal site was put into operation in December 1994. Due to prevailing conditions extraordinary in Central Europe (reservoir temperature 99{degrees}C; 220 g/l salinity) the project Neustadt-Glewe is supported by a comprehensive research program. The wells concerned (a doublet with an internal distance of 1.400 m) open the porous sandstone aquifer with an average thickness of about 53 m in a depth of 2.240m. One point of interest was the pressure and temperature behavior over a period of 10 years considering the fluid viscosity changes due to variable injection temperature. For means of reservoir simulation and prognosing the injection behavior and simulator code TOUGH2 was used.

  16. "Assistance to States on Geothermal Energy"

    Energy Technology Data Exchange (ETDEWEB)

    Linda Sikkema; Jennifer DeCesaro

    2006-07-10

    This final report summarizes work carried out under agreement with the U.S. Department of Energy, related to geothermal energy policy issues. This project has involved a combination of outreach and publications on geothermal energy—Contract Number DE-FG03-01SF22367—with a specific focus on educating state-level policymakers. Education of state policymakers is vitally important because state policy (in the form of incentives or regulation) is a crucial part of the success of geothermal energy. State policymakers wield a significant influence over all of these policies. They are also in need of high quality, non-biased educational resources which this project provided. This project provided outreach to legislatures, in the form of responses to information requests on geothermal energy and publications. The publications addressed: geothermal leasing, geothermal policy, constitutional and statutory authority for the development of geothermal district energy systems, and state regulation of geothermal district energy systems. These publications were distributed to legislative energy committee members, and chairs, legislative staff, legislative libraries, and other related state officials. The effect of this effort has been to provide an extensive resource of information about geothermal energy for state policymakers in a form that is useful to them. This non-partisan information has been used as state policymakers attempt to develop their own policy proposals related to geothermal energy in the states. Coordination with the National Geothermal Collaborative: NCSL worked and coordinated with the National Geothermal Collaborative (NGC) to ensure that state legislatures were represented in all aspects of the NGC's efforts. NCSL participated in NGC steering committee conference calls, attended and participated in NGC business meetings and reviewed publications for the NGC. Additionally, NCSL and WSUEP staff drafted a series of eight issue briefs published by the

  17. A survey of endangered waterbirds on Maui and Oahu and assessment of potential impacts to waterbirds from the proposed Hawaii Geothermal Project transmission corridor. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Evans, K.; Woodside, D.; Bruegmann, M. [Fish and Wildlife Service, Honolulu, HI (United States). Pacific Islands Office

    1994-08-01

    A survey of endangered waterbirds on Maui and Oahu was conducted during August and September 1993 to identify potential waterbird habitats within the general area of the proposed Hawaii Geothermal Project transmission corridor and to assess the potential impacts to endangered waterbird of installing and operating a high voltage transmission line from the Island of Hawaii to the islands of Oahu and Maui. Annual waterbird survey information and other literature containing information on specific wetland sites were summarized. Literature describing impacts of overhead transmission lines on birds was used to evaluate potential impacts of the proposed project on endangered waterbirds, resident wading birds, and migratory shorebirds and waterfowl. On Oahu, five wetland habitats supporting endangered Hawaiian waterbirds were identified within 2.5 miles of the proposed transmission line corridor. On Maui, three wetland habitats supporting endangered Hawaiian waterbirds were identified within the general area of the proposed transmission line corridor. Several of the wetlands identified on Oahu and Maui also supported resident wading birds and migratory shorebirds and waterfowl. Endangered waterbirds, resident wading birds, and migratory birds may collide with the proposed transmission lines wires. The frequency and numbers of bird collisions is expected to be greater on Oahu than on Maui because more wetland habitat exists and greater numbers of birds occur in the project area on Oahu. In addition, the endangered Hawaiian goose and the endangered Hawaiian petrel may be impacted by the proposed segment of the Hawaii Geothermal Project transmission line on Maui.

  18. Environmental management audit, Uranium Mill Tailings Remedial Action Project (UMTRA)

    International Nuclear Information System (INIS)

    1993-01-01

    The Office of Environment, Safety and Health (EH) has established, as part of the internal oversight responsibilities within Department of Energy (DOE), a program within the Office of Environmental Audit (EH-24), to conduct environmental audits at DOE's operating facilities. This document contains the results of the Environmental Management Audit of the Uranium Mill Tailings Remedial Action (UMTRA) Project. This Environmental Management Audit was conducted by the DOE's Office of Environmental Audit from October 26 through November 6, 1992. The audit's objective is to advise the Secretary as to the adequacy of UMTRA's environmental programs, and management organization in ensuring environmental protection and compliance with Federal, state, and DOE environmental requirements. This Environmental Management Audit's scope was comprehensive and covered all areas of environmental management with the exception of environmental programs pertaining to the implementation of the requirements of the National Environmental Policy Act (NEPA), which is the responsibility of the DOE Headquarters Office of NEPA Oversight

  19. Fernald Environmental Management Project 1995 site environmental report summary

    International Nuclear Information System (INIS)

    1996-06-01

    This report summarizes the 1995 Site Environmental Report for the Fernald site. It describes the Fernald site mission, exposure pathways, and environmental standards and guidelines. An overview is presented of the impact these activities have on the local environment and public health. Environmental monitoring activities measure and estimate the amount of radioactive and nonradioactive materials that may leave the site and enter the surrounding environment

  20. Fernald Environmental Management Project 1995 site environmental report

    International Nuclear Information System (INIS)

    1996-06-01

    The Fernald site continues to examine the air and liquid pathways as possible routes through which pollutants from past operations and current remedial activities may leave the site. This 1995 Site Environmental Report provides the general public as well as scientists and engineers with the results from the site's ongoing Environmental Monitoring Program. Also included in this report is information concerning the site's progress toward achieving full compliance with requirements set forth by DOE, US Environmental Protection Agency (USEPA), and Ohio EPA

  1. Housing projects in Trabzon: Marketting discourses and physical environmental features

    OpenAIRE

    AYDIN TÜRK, Yelda; KARADENİZ, Beyza

    2018-01-01

    Thehousing projects, that have turned into concept projects promoted as acommodity since last decade in Turkey. These projects, are marketed withdiscourses such as “the long-awaited life”, “ideal home” and are constructed onthe urban fringes. In this study, the housing projects that developed inTrabzon in recent years have been examined in this context. Marketing discourseand physical environmental characteristics of the projects have been analyzed.Thus, the study finds out to what extent the...

  2. Geothermal energy

    Directory of Open Access Journals (Sweden)

    Manzella A.

    2017-01-01

    Full Text Available Geothermal technologies use renewable energy resources to generate electricity and direct use of heat while producing very low levels of greenhouse-gas (GHG emissions. Geothermal energy is the thermal energy stored in the underground, including any contained fluid, which is available for extraction and conversion into energy products. Electricity generation, which nowadays produces 73.7 TWh (12.7 GW of capacity worldwide, usually requires geothermal resources temperatures of over 100 °C. For heating, geothermal resources spanning a wider range of temperatures can be used in applications such as space and district heating (and cooling, with proper technology, spa and swimming pool heating, greenhouse and soil heating, aquaculture pond heating, industrial process heating and snow melting. Produced geothermal heat in the world accounts to 164.6 TWh, with a capacity of 70.9 GW. Geothermal technology, which has focused for decades on extracting naturally heated steam or hot water from natural hydrothermal reservoirs, is developing to more advanced techniques to exploit the heat also where underground fluids are scarce and to use the Earth as a potential energy battery, by storing heat. The success of the research will enable energy recovery and utilization from a much larger fraction of the accessible thermal energy in the Earth’s crust.

  3. Geothermal energy

    Science.gov (United States)

    Manzella, A.

    2017-07-01

    Geothermal technologies use renewable energy resources to generate electricity and direct use of heat while producing very low levels of greenhouse-gas (GHG) emissions. Geothermal energy is the thermal energy stored in the underground, including any contained fluid, which is available for extraction and conversion into energy products. Electricity generation, which nowadays produces 73.7 TWh (12.7 GW of capacity) worldwide, usually requires geothermal resources temperatures of over 100 °C. For heating, geothermal resources spanning a wider range of temperatures can be used in applications such as space and district heating (and cooling, with proper technology), spa and swimming pool heating, greenhouse and soil heating, aquaculture pond heating, industrial process heating and snow melting. Produced geothermal heat in the world accounts to 164.6 TWh, with a capacity of 70.9 GW. Geothermal technology, which has focused for decades on extracting naturally heated steam or hot water from natural hydrothermal reservoirs, is developing to more advanced techniques to exploit the heat also where underground fluids are scarce and to use the Earth as a potential energy battery, by storing heat. The success of the research will enable energy recovery and utilization from a much larger fraction of the accessible thermal energy in the Earth's crust.

  4. Geothermal studies in China

    International Nuclear Information System (INIS)

    Wang Ji-Yang; Chen Mo-Xiang; Wang Ji-An; Deng Xiao; Wang Jun; Shen Hsien-Chieh; Hsiung Liang-Ping; Yan Shu-Zhen; Fan Zhi-Cheng; Liu Xiu-Wen

    1981-01-01

    Geothermal studies have been conducted in China continuosly since the end of the 1950's with renewed activity since 1970. Three areas of research are defined: (1) fundamental theoretical research of geothermics, including subsurface temperatures, terrestrial heat flow and geothermal modeling; (2) exploration for geothermal resources and exploitation of geothermal energy; (3) geothermal studies in mines. (orig./ME)

  5. Geothermal Information Dissemination and Outreach

    Energy Technology Data Exchange (ETDEWEB)

    Clutter, Ted J. [Geothermal Resources Council (United States)

    2005-02-18

    Project Purpose. To enhance technological and topical information transfer in support of industry and government efforts to increase geothermal energy use in the United States (power production, direct use, and geothermal groundsource heat pumps). Project Work. GRC 2003 Annual Meeting. The GRC convened the meeting on Oct. 12-15, 2003, at Morelia's Centro de Convenciones y ExpoCentro in Mexico under the theme, International Collaboration for Geothermal Energy in the Americas. The event was also sponsored by the Comision Federal de Electricidad. ~600 participants from more than 20 countries attended the event. The GRC convened a Development of Geothermal Projects Workshop and Geothermal Exploration Techniques Workshop. GRC Field Trips included Los Azufres and Paricutin Volcano on Oct. 11. The Geothermal Energy Association (Washington, DC) staged its Geothermal Energy Trade Show. The Annual Meeting Opening Session was convened on Oct. 13, and included the governor of Michoacan, the Mexico Assistant Secretary of Energy, CFE Geothermal Division Director, DOE Geothermal Program Manager, and private sector representatives. The 2003 Annual Meeting attracted 160 papers for oral and poster presentations. GRC 2004. Under the theme, Geothermal - The Reliable Renewable, the GRC 2004 Annual Meeting convened on Aug. 29-Sept. 1, 2004, at the Hyatt Grand Champions Resort at Indian Wells, CA. Estimated total attendance (including Trade Show personnel, guests and accompanying persons) was ~700. The event included a workshop, Geothermal Production Well Pump Installation, Operation and Maintenance. Field trips went to Coso/Mammoth and Imperial Valley/Salton Sea geothermal fields. The event Opening Session featured speakers from the U.S. Department of Energy, U.S. Department of the Interior, and the private sector. The Geothermal Energy Association staged its Geothermal Energy Trade Show. The Geothermal Education Office staged its Geothermal Energy Workshop. Several local radio and

  6. Mexican geothermal development and the future

    International Nuclear Information System (INIS)

    Serrano, J.M.E.V.

    1998-01-01

    Geothermics in Mexico started in 1954, by drilling the first geothermal well in Pathe, State of Hidalgo, which reached a depth of 237 meters. In 1959 electrical generation from geothermal origin began, with an installed capacity of 3.5 MW. From 1959 to 1994 Mexico increased its installed capacity to 753 MW, by developing three geothermal fields: Cerro Prieto, Los Azufres, and Los Humeros. Currently, 177 wells produce steam at a rate of 36 tons per hour (t/h) each. Comision Federal de Electricidad (CFE, Federal Commission of Electricity) has planned to increase the geothermal-electric installed capacity through construction and installation of several projects. Repowering of operating units and development of new geothermal zones will also allow Mexican geothermal growth

  7. Richland Environmental Restoration Project management action process document

    International Nuclear Information System (INIS)

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines

  8. Richland Environmental Restoration Project management action process document

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines.

  9. Environmental and Economic Benefit Analysis of an Integrated Heating System with Geothermal Energy—A Case Study in Xi’an China

    Directory of Open Access Journals (Sweden)

    Qingyou Yan

    2017-12-01

    Full Text Available Due to the increase in environmental problems and air pollution during the heating period, it is important to promote clean heating in cold regions, thereby meeting the heating demand in a green manner. In order to allocate resources more effectively and facilitate the consumption of renewable energy, this paper designs an integrated heating system that incorporates geothermal energy into the framework of an integrated energy system of electricity, heating, and gas. An analysis of the environmental and economic benefits indicates that the system reduces pollutant emissions and decreases the cost of urban heating. Using an example of central heating of residential buildings in Xi’an, the paper conducts a scenario analysis based on the gas peak-shaving ratio and the ratio of geothermal heating loads to basic heating loads. The results demonstrate that the environmental and economic benefits of the integrated heating system are higher compared to central heating using coal-fired boilers. In addition, this paper conducts a sensitivity analysis of the heat source to the price factors and the load ratios. The results show that the operating costs of the integrated heating system are most sensitive to the natural gas price and the gas peak-shaving ratio. Therefore, an optimum natural gas peak-shaving ratio can be determined.

  10. Technology assessment of geothermal energy resource development

    Energy Technology Data Exchange (ETDEWEB)

    1975-04-15

    Geothermal state-of-the-art is described including geothermal resources, technology, and institutional, legal, and environmental considerations. The way geothermal energy may evolve in the United States is described; a series of plausible scenarios and the factors and policies which control the rate of growth of the resource are presented. The potential primary and higher order impacts of geothermal energy are explored, including effects on the economy and society, cities and dwellings, environmental, and on institutions affected by it. Numerical and methodological detail is included in appendices. (MHR)

  11. Fernald Environmental Management Project 1995 site environmental report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    The Fernald site continues to examine the air and liquid pathways as possible routes through which pollutants from past operations and current remedial activities may leave the site. This 1995 Site Environmental Report provides the general public as well as scientists and engineers with the results from the site`s ongoing Environmental Monitoring Program. Also included in this report is information concerning the site`s progress toward achieving full compliance with requirements set forth by DOE, US Environmental Protection Agency (USEPA), and Ohio EPA.

  12. Investigations of Very High Enthalpy Geothermal Resources in Iceland.

    Science.gov (United States)

    Elders, W. A.; Fridleifsson, G. O.

    2012-12-01

    The Iceland Deep Drilling Project (IDDP) is investigating the economic feasibility of producing electricity from supercritical geothermal reservoirs. Earlier modeling indicates that the power output of a geothermal well producing from a supercritical reservoir could potentially be an order of magnitude greater than that from a conventional hot geothermal reservoir, at the same volumetric flow rate. However, even in areas with an unusually high geothermal gradient, for normal hydrostatic pressure gradients reaching supercritical temperatures and pressures will require drilling to depths >4 km. In 2009 the IDDP attempted to drill the first deep supercritical well, IDDP-01, in the caldera of the Krafla volcano, in NE Iceland. However drilling had to be terminated at only 2.1 km depth when ~900°C rhyolite magma flowed into the well. Our studies indicate that this magma formed by partial melting of hydrothermally altered basalts within the Krafla caldera. Although this well was too shallow to reach supercritical pressures, it is highly productive, and is estimated to be capable of generating up to 36 MWe from the high-pressure, superheated steam produced from the upper contact zone of the intrusion. With a well-head temperature of ~440°C, it is at present apparently the hottest producing geothermal well in the world. A pilot plant is investigating the optimal utilization of this magmatically heated resource. A special issue of the journal Geothermics with 16 papers reporting on the IDDP-01 is in preparation. However, in order to continue the search for supercritical geothermal resources, planning is underway to drill a 4.5 km deep well at Reykjanes in SW Iceland in 2013-14. Although drilling deeper towards the heat source of this already developed high-temperature geothermal field will be more expensive, if a supercritical resource is found, this cost increase should be offset by the considerable increase in the power output and lifetime of the Reykjanes geothermal

  13. Insights into the biological source and environmental gradients shaping the distribution of H-shaped glycerol dialkyl glycerol tetraethers in Yellowstone National Park geothermal springs

    Science.gov (United States)

    Jia, C.; Xie, W.; Wang, J.; Boyd, E. S.; Zhang, C.

    2013-12-01

    Archaea are ubiquitous in natural environments. The unique tetraether lipids in archaeal membranes enable the maintenance of ion permeability across broad environmental gradients. H-shaped isoprenoid glycerol dialkyl glycerol tetraethers (H-GDGTs), in which the two biphytanyl carbon skeletons are covalently bound by a carbon-carbon bond, have been recently identified in both marine and geothermal environments. Here we report the core H-GDGTs (C-H-GDGTs) and polar H-GDGTs (P-H-GDGTs) associated with sediments sampled from geothermal springs in Yellowstone National Park and investigate their abundance in relation to environmental gradients. The abundance of C- and P-H-GDGTs exhibit strong and negative correlation with pH (P = 0.007), suggesting that H-shaped GDGTs help to maintain cell membrane fluidity in acidic environments. Reanalysis of archaeal 16S rRNA gene pyrotags published previously from (Boyd E. Hamilton T. L., Wang J., He L., Zhang C. L. 2013. The role of tetraether lipid composition in the adaptation of thermophilic archaea to acidity. Frontiers in Terrestrial Microbiology. 4: doi: 10.3389/fmicb.2013.00062) indicates that these H-GDGTs are associated with environments dominanted by Thermoplasmatales, which are thermoacidiphiles. Two equations were established to define the relationships between the abundance of H-GDGTs, the abundance of archaeal taxa based on 16S rRNA gene phylogenetic affiliations, and pH. Both equations have high predictive capacity in predicting the distribution of archaeal lipids in the geothermal system. These observations provide new insight into the biological source of H-GDGTs and suggest a prominent role for these lipids in the diversification of archaea into or out of acidic high temperature environments.

  14. Geothermal energy

    Directory of Open Access Journals (Sweden)

    Manzella A.

    2015-01-01

    Full Text Available Geothermal technologies use renewable energy resources to generate electricity and direct use of heat while producing very low levels of greenhouse-gas (GHG emissions. Geothermal energy is stored in rocks and in fluids circulating in the underground. Electricity generation usually requires geothermal resources temperatures of over 100°C. For heating, geothermal resources spanning a wider range of temperatures can be used in applications such as space and district heating (and cooling, with proper technology, spa and swimming pool heating, greenhouse and soil heating, aquaculture pond heating, industrial process heating and snow melting. Geothermal technology, which has focused so far on extracting naturally heated steam or hot water from natural hydrothermal reservoirs, is developing to more advanced techniques to exploit the heat also where underground fluids are scarce and to use the Earth as a potential energy battery, by storing heat. The success of the research will enable energy recovery and utilization from a much larger fraction of the accessible thermal energy in the Earth’s crust.

  15. Final report Hanford environmental compliance project 89-D-172

    International Nuclear Information System (INIS)

    Kelly, J.R.

    1996-01-01

    The Hanford Environmental Compliance (HEC) Project is unique in that it consisted of 14 subprojects which varied in project scope and were funded from more that one program. This report describes the HEC Project from inception to completion and the scope, schedule, and cost of the individual subprojects. Also provided are the individual subproject Cost closing statements and Project completion reports accompanied by construction photographs and illustrations

  16. Environmental impacts of wind-energy projects

    National Research Council Canada - National Science Library

    Committee on Environmental Impacts of Wind Energy Projects, National Research Council

    2007-01-01

    .... Although the use of wind energy to generate electricity is increasing rapidly in the United States, government guidance to help communities and developers evaluate and plan proposed wind-energy projects is lacking...

  17. Fiscal 2000 project of inviting proposals for international joint research - invitation for international proposal (Energy conservation No.2). Achievement report on international joint study on popularization promotion of geothermal heat pump-assisted environmentally compatible heating system for Changchun City, China; 2000 nendo kokusai kyodo kenkyu teian kobo jigyo - kokusai teian kobo (Shoe No.2). Chinetsu heat pump ni yoru Chugoku Changchun shi kankyo tekigogata danbo system no fukyu sokushin ni kansuru kokusai kyodo kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    A geothermal heat pump-assisted heating system is introduced into Changchun City and a survey is conducted to determine if the system may be popularized in this extremely cold region located in the northeastern part of China. In concrete terms, the hot water that circulates through the office building of Changchun Ground Heat Development Co., Ltd., is switched to hot water prepared by a geothermal heat pump. The test continued from December 2000 to March 2001. It is then concluded that heating by geothermal heat pumps will be fully serviceable to Changchun City. Implemented are (1) the shift from the coal fired boiler system to a geothermal heat pump system comprising 16 subterranean heat exchangers for the heating of the office building which is approximately 1000 m{sup 2} large, (2) long-term monitoring of the operating conditions, (3) measurement of subterranean heat exchanger thermal conductivity and subterranean temperature, and (4) the study of pipe shapes for improved thermal efficiency, grouting materials, and the like. (NEDO)

  18. A statistical proposal for environmental impact assessment of development projects

    International Nuclear Information System (INIS)

    Plazas C, Julian A; De J Lema T, Alvaro; Leon P, Juan Diego

    2009-01-01

    Environmental impact assessment of development projects is a fundamental process, which main goal is to avoid that their construction and functioning, lead to serious and negative consequences on the environment. Some of the most important limitations of the models employed to assess environmental impacts, are the subjectivity of its parameters and weights, and the multicolineality among the variables, which represent high quantities of similar information. This work presents a multivariate statistical-based method that tries to diminish such limitations. For this purpose, environmental impact assessment, is valuated through different environmental impact attributes and environmental elements, synthesized in an environmental quality index (ICA in Spanish). ICA can be applied at different levels, such as at a project level, or applied only at a partial level on one or some environmental components.

  19. Overview of the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Shipler, D.B.; Napier, B.A.; Ikenberry, T.A.

    1992-04-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that specific and representative individuals and populations may have received as a result of releases of radioactive materials from historical operations at the Hanford Site. These dose estimates would account for the uncertainties of information regarding facilities operations, environmental monitoring, demography, food consumption and lifestyles, and the variability of natural phenomena. Other objectives of the HEDR Project include: supporting the Hanford Thyroid Disease Study (HTDS), declassifying Hanford-generated information and making it available to the public, performing high-quality, credible science, and conducting the project in an open, public forum. The project is briefly described

  20. Beverley project: draft environmental impact statement

    International Nuclear Information System (INIS)

    1982-07-01

    The Beverley deposit is located on the northern Lake Frome Plains, South Australia, 520km north of Adelaide. It is proposed to mine the deposit by in-situ leaching and to process the solution on the surface to produce an estimated 11,600t of yellowcake from about 6 million tonnes of 0.27% ore over approximately 23 years. The draft environmental impact statement is intended to cover all stages of the development from the pilot plant to final rehabilitation. Sections include the existing environment (geology, climate and meteorology, soils, hydrology, ecology, radionuclide base levels, land use, population and sites of Aboriginal and archaeological significance), the proposed development (solution mining, waste management, water management and mining and processing options), rehabilitation, environmental impact and environmental management and monitoring

  1. Jabiluka project - Draft Environmental Impact Statement. Appendices

    International Nuclear Information System (INIS)

    1996-01-01

    The Appendices provide various technical data in support of studies presented in the Main Report, including the guidelines for an EIS at Jabiluka, environmental requirements, waste management plan, water management system criteria, water quality data, transport licensing and security procedures, rehabilitation plus specialist studies into ore characteristics, noise issues and haulage risk assessment. Copyright (1996) Energy Resources of Australia Limited

  2. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    International Nuclear Information System (INIS)

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references

  3. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references.

  4. Federal Interagency Geothermal Activities

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, Arlene [Office of Energy Efficiency and Renewable Energy (EERE), Washington, DC (United States); Prencipe, Loretta [Office of Energy Efficiency and Renewable Energy (EERE), Washington, DC (United States); Todaro, Richard M. [Office of Energy Efficiency and Renewable Energy (EERE), Washington, DC (United States); Cuyler, David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Eide, Elizabeth [Office of Energy Efficiency and Renewable Energy (EERE), Washington, DC (United States)

    2011-06-01

    This collaborative document describes the roles and responsibilities of key Federal agencies in the development of geothermal technologies including the U.S. Department of Energy (DOE); the U.S. Department of Agriculture (USDA), including the U.S. Forest Service; the U.S. Department of Interior (DOI), including the United States Geological Survey (USGS) and Bureau of Land Management (BLM); the Environmental Protection Agency (EPA); and the Department of Defense (DOD).

  5. Hellsgate Winter Range : Wildlife Mitigation Project. Preliminary Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-01-01

    The Bonneville Power Administration proposes funding the Hellsgate Winter Range Wildlife Mitigation Project in cooperation with the Colville Convederated Tribes and Bureau of Indian Affairs. This Preliminary Environmental Assessment examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. The Propose action is intended to meet the need for mitigation of wildlife and wild life habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs.

  6. Geothermal energy utilization and technology

    CERN Document Server

    Dickson, Mary H; Fanelli, Mario

    2013-01-01

    Geothermal energy refers to the heat contained within the Earth that generates geological phenomena on a planetary scale. Today, this term is often associated with man's efforts to tap into this vast energy source. Geothermal Energy: utilization and technology is a detailed reference text, describing the various methods and technologies used to exploit the earth's heat. Beginning with an overview of geothermal energy and the state of the art, leading international experts in the field cover the main applications of geothermal energy, including: electricity generation space and district heating space cooling greenhouse heating aquaculture industrial applications The final third of the book focuses upon environmental impact and economic, financial and legal considerations, providing a comprehensive review of these topics. Each chapter is written by a different author, but to a set style, beginning with aims and objectives and ending with references, self-assessment questions and answers. Case studies are includ...

  7. The Narssaq-project - a geochemical, ecological environmental research project

    International Nuclear Information System (INIS)

    Soerensen, H.; Rose-Hansen, J.

    1978-01-01

    Two types of mineral occurrences near the town of Narssaq in South Greenland are recorded to be worth mining in the near future: the uranium occurrences at Kvanefjeld in the northern part of the Ilimaussaq intrusion and the zirconium occurrences in the southern part on the south coast of the Kangerdluarssuk fjord. Consideration of the environment plays a large part in discussions regarding the exploitation of these minerals. A report is given of the geochemical, ecological environmental investigations carried out at Narssaq since 1974. (BP)

  8. Evaluation Of The Risk Of Financing Projects Of Environmental Protection

    Directory of Open Access Journals (Sweden)

    Gabriela Cornelia PICIU

    2012-03-01

    Full Text Available The research project approaches multidimensionally the financing of environmental protection from the perspective of directing, correlating and consolidating the financial flows circumscribed to the regeneration of an economy affected by environmental deterioration due to the very activities defining the economic mechanisms and circuits. The purpose of the project is to identify, by scientific, methodological and empirical analysis of the concepts, principles and arguments imposed by the economic theory, the risks of financing the projects of environmental projects and to evaluate their effects because their neglecting, individual approach or erroneous dimensioning might have unfavourable and unforeseen consequences in terms of the efficiency of the environmental strategies and policies. The objective of the study is the reveal the interdependency and interaction between the flows and circuits financing the environmental projects, showing the necessity for punctual, distributive, correlative and multiplicative financing of the environmental protection. This must be done from an expanded and prospective spatial and temporal vision by a compositional approach of the risk for environmental investments within the complex network of the social, economic and financial risks generated by the global system of the human praxis focused on the binomial of the human-environment interdependence.

  9. Potential use of geothermal resources in the Snake River Basin: an environmental overview. Volume II. Annotated bibliography

    Energy Technology Data Exchange (ETDEWEB)

    Spencer, S.G.; Russell, B.F.; Sullivan, J.F. (eds.)

    1979-09-01

    This volume is a partially annotated bibliography of reference materials pertaining to the seven KGRA's. The bibliography is divided into sections by program element as follows: terrestrial ecology, aquatic ecology, heritage resources, socioeconomics and demography, geology, geothermal, soils, hydrology and water quality, seismicity, and subsidence. Cross-referencing is available for those references which are applicable to specific KGRA's. (MHR)

  10. SIHTI 2. Energy and environmental technology. Yearbook 1995. Project presentations

    International Nuclear Information System (INIS)

    Korhonen, M.; Thun, R.

    1997-01-01

    Detrimental impacts of various energy production forms, their prevention and costs to enterprises and to the society are studied in the National Research Programme on Energy and Environmental Technology - SIHTI 2. For this evaluation work databases on Finland's energy production, fuels and boilers and emissions of various production forms are needed. This is one of the main subtasks of the SIHTI Programme. Development of methods and tools required for environmental decision making and for the assessment of environmental costs and testing of their usability and reliability are equally important. Emission measurements are a problem field that continuously sets new challenges. In addition to energy production and its environmental impacts, environmental issues of the woodprocessing industries form another important research field of SIHTI 2 programme. A common aim of both fields is to reduce emissions of detrimental substances, to recycle raw materials, and to minimise and reuse wastes. Research and development projects are being carried out by a number of universities of different fields of science and technology, by research organisations and enterprises, and many projects are realised in close co-operation. In 1995, the programme comprised 28 R and D projects by universities and 22 enterprise-led projects. Results of these projects are presented in this yearbook. Part of the research projects continued from the preceding year and part were new projects continuing in 1996

  11. Results of the supplementary work to the fiscal 1994 New Sunshine Project. Development of geothermal power plants, etc. (development of production, technology for deep-seated geothermal resources); 1994 nendo new sunshine keikaku hojo jigyo seika hokokusho. Nessui riyo hatsuden plant to kaihatsu (shinbu chinetsu shigen saishu gijutsu no kaihatsu shinbu chinetsu shigen seisan gijutsu no kaihatsu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    The paper reports on the fiscal 1994 results of the study of the development of a technology for collecting deep-seated geothermal resources, which has been made for increasing the capacity of the geothermal power generation as a part of the New Sunshine Project. As a plan for the development, a development is made of logging equipment and its auxiliary system and then characteristics of the deep-seated geothermal well are clarified. The logging equipment is a PTSD (pressure/temperature/spinner flow-meter/fluid density) logger which stands the use at deep-seated geothermal wells of 400{degree}C and 490 kgf/cm{sup 2} and measures pressure, temperature, flow rate and fluid density under static and dynamic conditions. In this fiscal year, metal seals were developed for preventing geothermal fluids from penetrating into the PT probe. Qualities and inner/outer diameters of various kinds of structural materials used in the S probe were determined, and output necessary enough to detect the rotation number is obtained. Measuring precision of D logging by {gamma} rays was evaluated. The study was made of the monitoring technology including the borehole and ground measuring system, the borehole fluid sampling and the scale formation. Relating to the tracer widely used in monitoring of hydrothermal reservoirs, investigated was the trend of the technology from abroad. 8 refs., 60 figs., 26 tabs.

  12. Geothermal Permeability Enhancement - Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Joe Beall; Mark Walters

    2009-06-30

    The overall objective is to apply known permeability enhancement techniques to reduce the number of wells needed and demonstrate the applicability of the techniques to other undeveloped or under-developed fields. The Enhanced Geothermal System (EGS) concept presented in this project enhances energy extraction from reduced permeability zones in the super-heated, vapor-dominated Aidlin Field of the The Geysers geothermal reservoir. Numerous geothermal reservoirs worldwide, over a wide temperature range, contain zones of low permeability which limit the development potential and the efficient recovery of heat from these reservoirs. Low permeability results from poorly connected fractures or the lack of fractures. The Enhanced Geothermal System concept presented here expands these technologies by applying and evaluating them in a systematic, integrated program.

  13. Proceedings of NEDO International Geothermal Symposium

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-11

    This is a proceedings of the NEDO International Geothermal Symposium held in Sendai in 1997. The worldwide geothermal energy power generation capacity exceeds 7000 MW. Geothermal energy is widely used also for heating, snow melting, greenhouse cultivation as well as electric power generation. Geothermal energy generates far less CO2 causing the global warming than fossil fuels. The geothermal energy is clean and renewable. Considering the environmental issue and energy supply/demand of the world, we have to exert further efforts for the geothermal development. In this conference, discussions were made on each country`s experiences of the geothermal development, and future prediction and strategies for geothermal utilization in the Asia/Pacific region, in particular. Further, in the technical session, conducted were the IEA study and technical presentation/discussion for technical cooperation. The proceedings includes research reports of more than 30, which are clarified into three fields: impacts of the geothermal development on the environment, technical development of the hot dry rock power generation system, and development of technology for collecting deep-seated geothermal resource

  14. Geothermal development plan: Maricopa County

    Energy Technology Data Exchange (ETDEWEB)

    White, D.H.; Goldstone, L.A.

    1982-08-01

    The Maricopa County Geothermal Development Plan evaluated the market potential for utilizing geothermal energy. The study identified six potential geothermal resource areas with temperatures less than 100{sup 0}C (212{sup 0}F) and in addition, four suspected intermediate temperature areas (90{sup 0} to 150{sup 0}C, 194{sup 0} to 300{sup 0}F). Geothermal resources are found to occur in and near the Phoenix metropolitan area where average population growth rates of two to three percent per year are expected over the next 40 years. Rapid growth in the manufacturing, trade and service sectors of the regional economy provides opportunities for the direct utilization of geothermal energy. A regional energy use analysis is included containing energy use and price projections. Water supplies are found to be adequate to support this growth, though agricultural water use is expected to diminish. The study also contains a detailed section matching geothermal resources to potential users. Two comparative analyses providing economic details for space heating projects are incorporated.

  15. Olympic Dam project: draft environmental impact statement

    International Nuclear Information System (INIS)

    1982-10-01

    The Olympic Dam deposit, South Australia, is estimated to contain at least 2,000 million tonnes of mineralized material, with an average grade of about 1.6% copper, 0.6 Kg/t of uranium oxide and 0.6 g/t of gold. The objective of the project is to extract and process the ore for the production and sale of copper, uranium oxide and the associated gold and silver. Facilities required are an underground mine, an on-site processing plant, associated facilities including a tailings retention system, a town to accommodate up to 9,000 people and other infrastructure. Chapters in the draft E.I.S. contain information on the environment, land use, aboriginal environment, geology, tailings retention system, radiation assessment, project infrastructure, social effects and economic effects

  16. Griffith energy project final environmental impact statement

    International Nuclear Information System (INIS)

    1999-03-01

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fired, combined cycle power plant, on private lands south of Kingman, Arizona. The Project would be a merchant plant which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management. Public comments on the Draft EIS are addressed in the Final EIS, including addenda and modifications made as a result of the comments and/or new information

  17. Griffith Energy Project Final Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1999-04-02

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fuel, combined cycle power plant, on private lands south of Kingman, Ariz. The Project would be a ''merchant plant'' which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management. Public comments on the Draft EIS are addressed in the Final EIS, including addenda and modifications made as a result of the comments and/or new information.

  18. The Project-Based Learning Approach in Environmental Education

    Science.gov (United States)

    Genc, Murat

    2015-01-01

    The purpose of this study is to investigate the effect of project-based learning on students' attitudes toward the environment. In the study that was performed with 39 students who take the "Environmental Education" course, attitude changes toward the environment were investigated in students who developed projects on environmental…

  19. Deep geothermics

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    The hot-dry-rocks located at 3-4 km of depth correspond to low permeable rocks carrying a large amount of heat. The extraction of this heat usually requires artificial hydraulic fracturing of the rock to increase its permeability before water injection. Hot-dry-rocks geothermics or deep geothermics is not today a commercial channel but only a scientific and technological research field. The Soultz-sous-Forets site (Northern Alsace, France) is characterized by a 6 degrees per meter geothermal gradient and is used as a natural laboratory for deep geothermal and geological studies in the framework of a European research program. Two boreholes have been drilled up to 3600 m of depth in the highly-fractured granite massif beneath the site. The aim is to create a deep heat exchanger using only the natural fracturing for water transfer. A consortium of german, french and italian industrial companies (Pfalzwerke, Badenwerk, EdF and Enel) has been created for a more active participation to the pilot phase. (J.S.). 1 fig., 2 photos

  20. 78 FR 2685 - Central Utah Project Completion Act; East Hobble Creek Restoration Project Draft Environmental...

    Science.gov (United States)

    2013-01-14

    ... DEPARTMENT OF THE INTERIOR Office of the Secretary Central Utah Project Completion Act; East Hobble Creek Restoration Project Draft Environmental Assessment AGENCY: Office of the Assistant Secretary... assessment for the East Hobble Creek Restoration Project is available for public review and comment. The...

  1. 2012 geothermal energy congress. Proceedings

    International Nuclear Information System (INIS)

    2012-01-01

    Within the Geothermal Energy Congress 2012 from 13th to 16th November 2012, in Karlsruhe (Federal Republic of Germany), the following lectures were held: (1) Comparison of different methods for the design of geothermal probes on the example of the thermal utilization of smouldering fires at heaps (Sylvia Kuerten); (2) Determination of the thermo-physical features of loose rocks (Johannes Stegner); (3) Tools for the planning and operation of district heating grids (Werner Seichter); (4) geo:build - System optimisation of the cooling mode of the ground-source heat and cooling supply (Franziska Bockelmann); (5) Successful and economic conception, planning and optimization of district heating grids (Werner Seichter); (6) Treacer / Heat transfer decoupling in a heterogeneous hydrothermal reservoir characterized by geological faults in the Upper Rhine Graben (I. Ghergut); (7) Determination of the porosity, thermal conductivity and particle size distribution in selected sections of the Meisenheim-1 drilling core (Saar-Nahe basin, Rheinland-Palatinate) under consideration of geothermally relevant formulation of questions (Gillian Inderwies); (8) Innovative technologies of exploration in the Jemez Geothermal project, New Mexico, USA (Michael Albrecht); (9) Geothermal energy, heat pump and TABS - optimization of planning, operational control and control (Franziska Bockelmann); (10) The impact of large-scale geothermal probes (storage probes) on the heat transfer and heat loss (Christopher Steins); (11) Numeric modelling of the permocarbon in the northern Upper Rhine Graben (L. Dohrer); (12) Engineering measurement solutions on quality assurance in the exploitation of geothermal fields (C. Lehr); (13) Evaluation and optimization of official buildings with the near-surface geothermal energy for heating and cooling (Franziska Bockelmann); (14) On-site filtration for a rapid and cost-effective quantification of the particle loading in the thermal water stream (Johannes Birner

  2. The National Geothermal Energy Research Program

    Science.gov (United States)

    Green, R. J.

    1974-01-01

    The continuous demand for energy and the concern for shortages of conventional energy resources have spurred the nation to consider alternate energy resources, such as geothermal. Although significant growth in the one natural steam field located in the United States has occurred, a major effort is now needed if geothermal energy, in its several forms, is to contribute to the nation's energy supplies. From the early informal efforts of an Interagency Panel for Geothermal Energy Research, a 5-year Federal program has evolved whose objective is the rapid development of a commercial industry for the utilization of geothermal resources for electric power production and other products. The Federal program seeks to evaluate the realistic potential of geothermal energy, to support the necessary research and technology needed to demonstrate the economic and environmental feasibility of the several types of geothermal resources, and to address the legal and institutional problems concerned in the stimulation and regulation of this new industry.

  3. Domestic environmental requirements, new and projected

    Energy Technology Data Exchange (ETDEWEB)

    McLean, B.J. [Environmental Protection Agency, Washington, DC (United States)

    1997-12-31

    The paper outlines and/or gives data on the following: environmental concerns; goal of Title IV; national SO{sub 2} emissions; reductions in wet sulfate deposition; SO{sub 2} allowance program--benefits and costs; utility NO{sub x} emissions; NO{sub x} compliance options; cost effectiveness of NO{sub x} control; electric power regulations timeline; Clean Air power initiative; what a new approach would look like; and an analysis of NO{sub x} and SO{sub 2} cap and trade scenarios.

  4. Environmental concerns drive project planning and design

    International Nuclear Information System (INIS)

    Hamilton, G.M.

    1994-01-01

    This paper describes the measures used to retrofit and requalify a Northwest Pipeline Corp., pipeline near Seattle, Washington. The pipeline is a 26 inch transmission line which has lost operating pressure because of the growth in Seattle's population. The pipeline was redesigned to requalify to a maximum pressure of 809 pounds per square inch. The paper describes the environmental issues faced during the construction and reconstruction efforts to protect wetlands and dispose of pipeline wastes. It describes the methods for cleaning the inside of the pipelines using various chemicals and cleaning tools

  5. Uranium Mill Tailings Remedial Action Project environmental protection implementation plan

    International Nuclear Information System (INIS)

    1994-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the U.S. Department of Energy (DOE) Order 5400.1. The UMTRA EPIP is updated annually. This version covers the time period of 9 November 1994, through 8 November 1995. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies

  6. Uranium Mill Tailings Remedial Action Project environmental protection implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the U.S. Department of Energy (DOE) Order 5400.1. The UMTRA EPIP is updated annually. This version covers the time period of 9 November 1994, through 8 November 1995. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies.

  7. Project W-314 phase I environmental permits and approvals plan

    International Nuclear Information System (INIS)

    TOLLEFSON, K.S.

    1999-01-01

    This document describes the range of environmental actions, including required permits and other agency approvals, for Project W-314 activities in the Hanford Site's Tank Waste Remediation System. This document outlines alternative approaches to satisfying applicable environmental standards, and describes selected strategies for acquiring permits and other approvals needed for waste feed delivery to proceed. This document also includes estimated costs and schedule to obtain the required permits and approvals based on the selected strategy. It also provides estimated costs for environmental support during design and construction based on the preliminary project schedule provided

  8. The GEOTREF program, a new approach for geothermal investigation

    Science.gov (United States)

    Gérard, Frédéric; Viard, Simon; Garcia, Michel

    2017-04-01

    The GEOTREF is an R&D program supported by the ADEME, French environmental agency and by the «Investissement d'Avenir », a French government program to found innovative projects. The GEOTREF program aims to develop an integrated analysis of high temperature geothermal reservoir in volcanic context. It is a collaborative program between nine research laboratories and two industrial partners. This program is supported for four years and funds 12 PhDs and 5 post-doctoral grants in various fields: geology, petrography, petrophysics, geophysics, geochemistry, reservoir modelling. The first three years are dedicated to the exploration phases that will lead to the drilling implantation. The project has two main objectives. 1.- Developing innovative and interactive methods and workflows leading to develop prospection and exploration in per volcanic geothermal target. This objective implicates: Optimization of the targeting to mitigate financial risks Adapting oil and gas exploration methods to geothermal energy, especially in peri-volcanic context. 2.- Applying this concept to different prospects in the Caribbean and South America The first target zone is located in Guadeloupe, an island of the active arc of the subduction zone where the Atlantic plate subducts under the Caribbean one. The GEOTREF prospect zone is on the Basse Terre Island in its south part closed to the Soufriere volcano, the active volcanic system. On the same island a geothermal field is exploited in Bouillante, just northward from the GEOTREF targeting area.

  9. Geothermal Energy Potential in Western United States

    Science.gov (United States)

    Pryde, Philip R.

    1977-01-01

    Reviews types of geothermal energy sources in the western states, including hot brine systems and dry steam systems. Conversion to electrical energy is a major potential use of geothermal energy, although it creates environmental disruptions such as noise, corrosion, and scaling of equipment. (AV)

  10. Geothermal progress monitor. Progress report No. 4

    Energy Technology Data Exchange (ETDEWEB)

    1980-09-01

    The following are included: geothermal power plants proposed and on-line; direct heat applications proposed and operational; trends in drilling activities; exploration; leases; outreach and technical assistance; feasibility studies and application demonstrations; geothermal loan guaranty program; research and development activities; legal, institutional, and regulatory activities; environmental activities; reports and publications; and a directory. (MHR)

  11. Puna Geothermal Venture Hydrologic Monitoring Program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1990-04-01

    This document provides the basis for the Hydrologic Monitoring Program (HMP) for the Puna Geothermal Venture. The HMP is complementary to two additional environmental compliance monitoring programs also being submitted by Puma Geothermal Venture (PGV) for their proposed activities at the site. The other two programs are the Meteorology and Air Quality Monitoring Program (MAQMP) and the Noise Monitoring Program (NMP), being submitted concurrently.

  12. International environmental issues and requirements for new power projects

    Energy Technology Data Exchange (ETDEWEB)

    Newman, J.R. [Golder Associates Inc., Gainesville, FL (United States); Maltby, J.H. [Golder Associates Inc., Washington, DC (United States)

    1997-12-31

    The purpose of this presentation was to discuss the emerging role of financial entities in determining environmental requirements for international power projects. The paper outlines the following: emerging conditions; examples of announced privatization energy projects by country; types of government and international financial entity sources; problems for IPPs; similarity and differences between the World Bank and the USEPA; comparison of the international standards and regulations for power plants; recent trends/issues involving international power project approval; and recommendations for understanding/expediting the financial entities` environmental approval process and how to expedite this process.

  13. A bar coding system for environmental projects

    International Nuclear Information System (INIS)

    Barber, R.B.; Hunt, B.J.; Burgess, G.M.

    1988-01-01

    This paper presents BeCode systems, a bar coding system which provides both nuclear and commercial clients with a data capture and custody management program that is accurate, timely, and beneficial to all levels of project operations. Using bar code identifiers is an essentially paperless and error-free method which provides more efficient delivery of data through its menu card-driven structure, which speeds collection of essential data for uploading to a compatible device. The effects of this sequence include real-time information for operator analysis, management review, audits, planning, scheduling, and cost control

  14. Healy Clean Coal Project, Healy, Alaska final Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-14

    This Environmental Monitoring Plan (EMP) provides the mechanism to evaluate the integrated coal combustion/emission control system being demonstrated by the Healy Clean Coal Project (HCCP) as part-of the third solicitation of the US Department of Energy (DOE) Clean Coal Technology Demonstration Program (CCT-III). The EMP monitoring is intended to satisfy two objectives: (1) to develop the information base necessary for identification, assessment, and mitigation of potential environmental problems arising from replication of the technology and (2) to identify and quantify project-specific and site-specific environmental impacts predicted in the National Environmental Policy Act (NEPA) documents (Environmental Impact Statement and Record of Decision). The EMP contains a description of the background and history of development of the project technologies and defines the processes that will take place in the combustion and spray dryer absorber systems, including the formation of flash-calcined material (FCM) and its use in sulfur dioxide (SO{sub 2}) removal from the flue gases. It also contains a description of the existing environmental resources of the project area. The EMP includes two types of environmental monitoring that are to be used to demonstrate the technologies of the HCCP: compliance monitoring and supplemental monitoring. Compliance monitoring activities include air emissions, wastewater effluents, and visibility. Monitoring of these resources provide the data necessary to demonstrate that the power plant can operate under the required state and federal statutes, regulations, and permit requirements.

  15. Integrating TOM into environmental projects, Angela B. Quinlan

    International Nuclear Information System (INIS)

    Caldwell, J.A.

    1992-01-01

    Responsible and cost-effective waste management and environmental restoration are best achieved when the principles and procedures of Total Quality Management are made an integral part of the process. By describing three case histories, we explore and explain techniques for using TQM in environmental projects. Key aspects considered include: quality measurement systems; establishing and maintaining standard operating procedures; management and technical peer review; the use of Quality Improvement Teams; Roadmapping (a new procedure that the US Department of Energy is incorporating into environmental restoration programs); and the role of audit teams in document production. The three case histories covered include: The Department of Energy's Uranium Mill Tailings Remedial Action Project on which Roadmapping and Quality Improvement Teams have led to significant changes in procedures; the EPA ARCS program on which adoption of project management Standard Operating Procedures enhanced cost and schedule control; the Jacobs Engineering TQM program that emphasizes performance measurement and management and project technical peer review

  16. Integration of deep geothermal energy and woody biomass conversion pathways in urban systems

    International Nuclear Information System (INIS)

    Moret, Stefano; Peduzzi, Emanuela; Gerber, Léda; Maréchal, François

    2016-01-01

    Highlights: • Novel optimization-based methodology to integrate renewable energy systems in cities. • Multiperiod model including storage, heat integration and Life Cycle Assessment. • Case study: systematic assessment of deep geothermal and wood conversion pathways. • Identification of novel wood-geothermal hybrid systems leading to higher efficiencies. • Extensive Supplementary Material to ensure full reproducibility of the work. - Abstract: Urban systems account for about two-thirds of global primary energy consumption and energy-related greenhouse gas emissions, with a projected increasing trend. Deep geothermal energy and woody biomass can be used for the production of heat, electricity and biofuels, thus constituting a renewable alternative to fossil fuels for all end-uses in cities: heating, cooling, electricity and mobility. This paper presents a methodology to assess the potential for integrating deep geothermal energy and woody biomass in an urban energy system. The city is modeled in its entirety as a multiperiod optimization problem with the total annual cost as an objective, assessing as well the environmental impact with a Life Cycle Assessment approach. For geothermal energy, deep aquifers and Enhanced Geothermal Systems are considered for stand-alone production of heat and electricity, and for cogeneration. For biomass, besides direct combustion and cogeneration, conversion to biofuels by a set of alternative processes (pyrolysis, Fischer-Tropsch synthesis and synthetic natural gas production) is studied. With a scenario-based approach, all pathways are first individually evaluated. Secondly, all possible combinations between geothermal and biomass options are systematically compared, taking into account the possibility of hybrid systems. Results show that integrating these two resources generates configurations featuring both lower costs and environmental impacts. In particular, synergies are found in innovative hybrid systems using

  17. Environmental Audit, Weldon Spring Site Remedial Action Project

    International Nuclear Information System (INIS)

    1991-06-01

    This report documents the results of the Environmental Baseline Audit of DOE's Weldon Spring Site Remedial Action Project (WSSRAP), located in St. Charles, Missouri. The purpose of the Environmental Baseline Audit is to provide the Secretary of Energy with concise information pertaining to the following issues: (1) compliance status with applicable environmental regulations (with the exception of National Environmental Policy Act [NEPA] requirements); (2) adherence to best management and accepted industry practices; (3) DOE vulnerabilities and liabilities associated with compliance status, environmental conditions, and management practices; (4) root causes of compliance findings (CF) and best management practice (BMP) findings; (5) adequacy of environmental management programs and organizations; and (6) noteworthy practices. This information will assist DOE in determining patterns and trends in environmental compliance, BMPs, and root causes, and will provide the information necessary for line management to take appropriate corrective actions. 6 figs., 11 tabs

  18. Geothermal tomorrow 2008

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2009-01-18

    Contributors from the Geothermal Technologies Program and the geothermal community highlight the current status and activities of the Program and the development of the global resource of geothermal energy.

  19. Yakima Fisheries Project. Final environmental impact statement

    International Nuclear Information System (INIS)

    1996-01-01

    BPA proposes to fund several fishery-related activities in the Yakima River Basin. These activities, known as the Yakima Fisheries Project (YFP), would be jointly managed by the State of Washington and the Yakima Indian Nation. The YFP is included in the Northwest Power Planning Council's (Council's) fish and wildlife program. The Council selected the Yakima River system for attention because fisheries resources are severely reduced from historical levels and because there is a significant potential for enhancement of these resources. BPA's proposed action is to fund (1) information gathering on the implementation of supplementation techniques and on feasibility of reintroducing coho salmon in an environment where native populations have become extinct; (2) research activities based on continuous assessment, feedback and improvement of research design and activities (open-quotes adaptive managementclose quotes); and (3) die construction, operation, and maintenance of facilities for supplementing populations of upper Yakima spring chinook salmon. Examined in addition to No Action are two alternatives for action: (1) supplementation of depressed natural populations of upper Yakima spring chinook and (2) that same supplementation plus a study to determine the feasibility of reestablishing naturally spawning population and a significant fall fishery for coho in the Yakima Basin. Alternative 2 is the preferred action. A central hatchery would be built for either alternative, as well as three sites with six raceways each for acclimation and release of spring chinook smolts. Major issues examined in the Revised Draft EIS include potential impacts of the project on genetic and ecological resources of existing fish populations, on water quality and quantity, on threatened and endangered species listed under the Endangered Species Act, and on the recreational fishery

  20. Yakima Fisheries Project : Final Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Washington (State). Dept. of Fish and Wildlife; Confederated Tribes and Bands of the Yakama Nation, Washington.

    1996-01-01

    BPA proposes to fund several fishery-related activities in the Yakima River Basin. These activities, known as the Yakima Fisheries Project (YFP), would be jointly managed by the State of Washington and the Yakima Indian Nation. The YFP is included in the Northwest Power Planning Council`s (Council`s) fish and wildlife program. The Council selected the Yakima River system for attention because fisheries resources are severely reduced from historical levels and because there is a significant potential for enhancement of these resources. BPA`s proposed action is to fund (1) information gathering on the implementation of supplementation techniques and on feasibility of reintroducing coho salmon in an environment where native populations have become extinct; (2) research activities based on continuous assessment, feedback and improvement of research design and activities ({open_quotes}adaptive management{close_quotes}); and (3) die construction, operation, and maintenance of facilities for supplementing populations of upper Yakima spring chinook salmon. Examined in addition to No Action are two alternatives for action: (1) supplementation of depressed natural populations of upper Yakima spring chinook and (2) that same supplementation plus a study to determine the feasibility of reestablishing naturally spawning population and a significant fall fishery for coho in the Yakima Basin. Alternative 2 is the preferred action. A central hatchery would be built for either alternative, as well as three sites with six raceways each for acclimation and release of spring chinook smolts. Major issues examined in the Revised Draft EIS include potential impacts of the project on genetic and ecological resources of existing fish populations, on water quality and quantity, on threatened and endangered species listed under the Endangered Species Act, and on the recreational fishery.

  1. The deep geothermal project along the shore of the Lake of Geneva - Synthesis report of Phase A; Projet de geothermie profonde sur la cote vaudoise. Rapport de synthese de la phase A - Rapport final

    Energy Technology Data Exchange (ETDEWEB)

    Vallat, P. [CCMP Plus, Gland (Switzerland)

    2009-04-15

    Preliminary studies have shown the geothermal potential of deep aquifers in the region named 'La Cote' between the Jura mountain and the Lake of Geneva, between Geneva and Lausanne, Switzerland. The present synthesis report reviews the geological features of the region - known from previous boring - and the expected heat demand in the region. Several sites have been identified where cost-covering operation of a geothermal district heating is expected. Recommendations for the following steps of the project are given.

  2. Environmental management plan (EMP) for Melamchi water supply project, Nepal.

    Science.gov (United States)

    Khadka, Ram B; Khanal, Anil B

    2008-11-01

    More than 1.5 million people live in the Kathmandu valley. The valley is facing an extreme shortage of water supply. At the same time the demand is escalating rapidly. To address this issue of scarcity of water, the government of Nepal has proposed a project of inter-basin transfer of water from Melamchi River located 40 km north-east of the Kathmandu valley. The project will cover two districts and three municipalities and will potentially have significant impacts on the environment. In accordance with the Environmental Protection Regulation of Nepal (1997), the Melamchi Water Supply Project (MWSP) has undergone an EIA during the feasibility study stage of the proposed project. The recommendations contained in the EIA were integrated into the project design for implementation in 2006. This paper summarizes the background of MWSP, the environmental concerns described in the EIA and the status of Environmental Management Plan (EMP) developed to address environmental compliance and other issues involving participation and support of the local people. This paper also provides some lessons to learn on the modalities of addressing the demands and grievances of the local people concerning environmental management.

  3. Hellsgate Winter Range: Wildlife Mitigation Project. Final Environmental Assessment

    International Nuclear Information System (INIS)

    1995-03-01

    BPA proposes to fund the Hellsgate Winter Range: Wildlife Mitigation Project (Project) in a cooperative effort with the Colville Confederated Tribes and the Bureau of Indian Affairs (BIA). The Project is intended to mitigate for wildlife and wildlife habitat adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs. The Project would allow the sponsors to secure land and conduct wildlife habitat improvement and long-term management activities within the boundaries of the Colville Indian Reservation. BPA has prepared an Environmental Assessment (EA) (DOE/EA-0940) evaluating the potential environmental effects of the proposed Project (Alternative B) and No Action (Alternative A). Protection and re-establishment of riparian and upland habitat on the Colville Indian Reservation, under Alternative B, would not have a significant adverse environmental impact because: (1) there would be only limited, mostly short-term adverse impacts on soils, water quality, air quality, vegetation, and wildlife (including no effect on endangered species); and (2) there would be no adverse effect on water quantity, cultural resources, or land use. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI

  4. Near-Facility Environmental Monitoring Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    MCKINNEY, S.M.

    2000-01-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near-facility environmental monitoring directed by Waste Management Technical Services and supersedes HNF-EP-0538-4. This plan applies to all sampling and monitoring activities performed by Waste Management Technical Services in implementing near-facility environmental monitoring at the Hanford Site. This Quality Assurance Project Plan is required by U.S. Department of Energy Order 5400.1 (DOE 1990) as a part of the Environmental Monitoring Plan (DOE-RL 1997) and is used to define: Environmental measurement and sampling locations used to monitor environmental contaminants near active and inactive facilities and waste storage and disposal sites; Procedures and equipment needed to perform the measurement and sampling; Frequency and analyses required for each measurement and sampling location; Minimum detection level and accuracy; Quality assurance components; and Investigation levels. Near-facility environmental monitoring for the Hanford Site is conducted in accordance with the requirements of U.S. Department of Energy Orders 5400.1 (DOE 1990), 5400.5 (DOE 1993), 5484.1 (DOE 1990), and 435.1 (DOE 1999), and DOE/EH-O173T (DOE 1991). It is Waste Management Technical Services' objective to manage and conduct near-facility environmental monitoring activities at the Hanford Site in a cost-effective and environmentally responsible manner that is in compliance with the letter and spirit of these regulations and other environmental regulations, statutes, and standards

  5. A model of the environmental impacts of hydropower projects

    International Nuclear Information System (INIS)

    Kemppainen, T.; Haemaelaeinen, I.

    1992-01-01

    The aim was to create a model of the effects of hydropower modernization and extension projects in Finland. To illustrate the effects of hydropower projects a checklist in the form of matrice was constructed. In this matrice all issues that could be significant in future hydropower projects were collected. Stable physical environmental changes are the starting-point for this matrice. The temporary change of hydropower constructions have also been under consideration. These are mainly environmental changes during construction. In chapter two the effects of hydropower modernization and extension projects physical environmental changes were examined. In chapter three the matrice was applied to some example cases. The cases were chosen to represent future hydropower projects. In addition these example cases represent urban areas, rural areas and uninhabited areas. The example cases were the extension of Tainionkoski hydropower plant at Vuoksi river, the modernization of Aeetsae power plant at Kokemaeenjoki river, the modernization of Stadsfors power plant at Lapuanjoki river in the centre of Uusikaarlepyy town and the construction of Kaitfors power plant at Perhonjoki river. Conclusions from usability of the model can be drawn on the ground of the example cases. The purpose of the model is to produce a checklist of estimated environmental effects in hydropower project of various kinds. Examination of issues within the model depends on local circumstances. Endangered animal and plant species, for example, can be studied and estimated only if endangered animal and plant species exist in the area of hydropower plant. Furthermore, the direction and extent of environmental effects depend on the local circumstances. The model is mainly a checklist of environmental effects caused by hydropower plant projects

  6. FY 1974 Report on results of Sunshine Project. Feasibility study on techniques for measurement of conditions within geothermal wells; 1974 nendo chinetsu koseinai sokutei gijutsu ni kansuru feasibility study

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1975-03-01

    This report covers the principles and methods of various bed-detecting techniques and their application, to begin with, current status of these techniques, results of feasibility studies on system data processing, well mouth analyzing systems, how to develop techniques for detecting geothermal beds, bed-detecting systems and environment-simulating devices, and finally conclusions, for the subject research and development project. The detecting techniques used for the geothermal area include those based on electrical properties, temperature, pressure and flow rate, analysis of core and fluids collected by analyzing systems at the well mouths, and detection of H{sub 2}S gas. Evaluation of geothermal reservoirs needs the data of absolute temperature of the geothermal sources, quantities of vapors spouting out of the wells, depth of boiling planes and pressure; and other basic data, e.g., void volumes of broad sense, quantitative evaluation results of cracks, shapes of naked well walls, expansion of reservoirs relative to bed, and effective bed thickness, which are determined by bed-detecting techniques for physical properties. It is necessary to develop the bed-detection systems adequately covering bed-detection items, detection of production beds for geothermal measurement, other bed-detection systems, and heat-resistant wire line cables and other cables serviceable at high temperature, as the essential items for obtaining the above data. (NEDO)

  7. Environmentally compliant manufacturing. Project accomplishment summary

    International Nuclear Information System (INIS)

    Morris, T.O.

    1997-01-01

    The metal working industry needs to reduce the waste associated with scrap, worn tools, degradation of metal working fluids, and etc. One task in this project concerned metal working fluids (MWF), which typically consists of surfactants, anti-microbial agents, lubricating agents, complexing agents, and a number of other components. The waste stream volume from the MWF can be reduced by judiciously (1) recycling, (2) selective replacement of expended components, and (3) protecting against microbial contamination. This activity consists of developing an analytical method, amenable to automation, which addresses all three of the methods of extending the MWF lifetime, thereby reducing the waste stream. The technology for determining key components in MWF on-line (at the machine tool) did not exist. The Y-12 Plant's collaboration was selected for this particular endeavor because of its ongoing machining operations and expertise in automation. In addition, concerns have been raised regarding chronic exposure of machine shop personnel to metal working fluid mists generated during routine machining operations. The chemical composition of metal working fluids is fairly well known, however, the chemical and physical characteristics of the resulting aerosols (mists) are not as well known. Machinists exposed to these aerosols by inhalation and skin contact sometimes develop unpleasant reactions. The second task involved efforts to characterize mists generated from candidate cutting fluids

  8. Sweetwater Uranium Project. Draft environmental statement

    International Nuclear Information System (INIS)

    1977-12-01

    The proposed action is the issuance of a Source Material License to Minerals Exploration Company for the construction and operation of the proposed Sweetwater Uranium Mill with a nominal capacity of 3000 tons (2.7 x 10 6 kg) per day of uranium ore in Wyoming. The applicant proposes also to construct a heap-leaching and resin ion-exchange facility to extract uranium from low-grade ores and mine water. Impacts to the area due to the operation of the Sweetwater Uranium Mine/Mill Project will result in: Alternations of up to 2200 acres by the mill, mine pit area, and roads, and about 3450 acres of Battle Spring Flat to be inundated by mine dewatering operations; increase in the existing background radiation levels; socioeconomic effects on Rawlins and other nearby areas; and tailings from the mill will be produced at a rate of about 3000 tons (2.7 x 10 6 kg) per day and will be stored onsite in a lined impoundment. Conditions for the issuance of the license are given

  9. Uranium Mill Tailings Remedial Action Project 1994 environmental report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    This annual report documents the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1994, surface remedial action was complete at 14 of the 24 designated UMTRA Project processing sites: Canonsburg, Pennsylvania; Durango, Colorado; Grand Junction, Colorado; Green River Utah, Lakeview, Oregon; Lowman, Idaho; Mexican Hat, Utah; Riverton, Wyoming; Salt Lake City, Utah; Falls City, Texas; Shiprock, New Mexico; Spook, Wyoming, Tuba City, Arizona; and Monument Valley, Arizona. Surface remedial action was ongoing at 5 sites: Ambrosia Lake, New Mexico; Naturita, Colorado; Gunnison, Colorado; and Rifle, Colorado (2 sites). Remedial action has not begun at the 5 remaining UMTRA Project sites that are in the planning stage. Belfield and Bowman, North Dakota; Maybell, Colorado; and Slick Rock, Colorado (2 sites). The ground water compliance phase of the UMTRA Project started in 1991. Because the UMTRA Project sites are.` different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  10. Uranium Mill Tailings Remedial Action Project 1994 environmental report

    International Nuclear Information System (INIS)

    1995-08-01

    This annual report documents the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1994, surface remedial action was complete at 14 of the 24 designated UMTRA Project processing sites: Canonsburg, Pennsylvania; Durango, Colorado; Grand Junction, Colorado; Green River Utah, Lakeview, Oregon; Lowman, Idaho; Mexican Hat, Utah; Riverton, Wyoming; Salt Lake City, Utah; Falls City, Texas; Shiprock, New Mexico; Spook, Wyoming, Tuba City, Arizona; and Monument Valley, Arizona. Surface remedial action was ongoing at 5 sites: Ambrosia Lake, New Mexico; Naturita, Colorado; Gunnison, Colorado; and Rifle, Colorado (2 sites). Remedial action has not begun at the 5 remaining UMTRA Project sites that are in the planning stage. Belfield and Bowman, North Dakota; Maybell, Colorado; and Slick Rock, Colorado (2 sites). The ground water compliance phase of the UMTRA Project started in 1991. Because the UMTRA Project sites are.' different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments

  11. Federal Geothermal Research Program Update Fiscal Year 2004

    Energy Technology Data Exchange (ETDEWEB)

    2005-03-01

    The Department of Energy (DOE) and its predecessors have conducted research and development (R&D) in geothermal energy since 1971. The Geothermal Technologies Program (GTP) works in partnership with industry to establish geothermal energy as an economically competitive contributor to the U.S. energy supply. Geothermal energy production, a $1.5 billion a year industry, generates electricity or provides heat for direct use applications. The technologies developed by the Geothermal Technologies Program will provide the Nation with new sources of electricity that are highly reliable and cost competitive and do not add to America's air pollution or the emission of greenhouse gases. Geothermal electricity generation is not subject to fuel price volatility and supply disruptions from changes in global energy markets. Geothermal energy systems use a domestic and renewable source of energy. The Geothermal Technologies Program develops innovative technologies to find, access, and use the Nation's geothermal resources. These efforts include emphasis on Enhanced Geothermal Systems (EGS) with continued R&D on geophysical and geochemical exploration technologies, improved drilling systems, and more efficient heat exchangers and condensers. The Geothermal Technologies Program is balanced between short-term goals of greater interest to industry, and long-term goals of importance to national energy interests. The program's research and development activities are expected to increase the number of new domestic geothermal fields, increase the success rate of geothermal well drilling, and reduce the costs of constructing and operating geothermal power plants. These improvements will increase the quantity of economically viable geothermal resources, leading in turn to an increased number of geothermal power facilities serving more energy demand. These new geothermal projects will take advantage of geothermal resources in locations where development is not currently

  12. Federal Geothermal Research Program Update - Fiscal Year 2004

    Energy Technology Data Exchange (ETDEWEB)

    Patrick Laney

    2005-03-01

    The Department of Energy (DOE) and its predecessors have conducted research and development (R&D) in geothermal energy since 1971. The Geothermal Technologies Program (GTP) works in partnership with industry to establish geothermal energy as an economically competitive contributor to the U.S. energy supply. Geothermal energy production, a $1.5 billion a year industry, generates electricity or provides heat for direct use applications. The technologies developed by the Geothermal Technologies Program will provide the Nation with new sources of electricity that are highly reliable and cost competitive and do not add to America's air pollution or the emission of greenhouse gases. Geothermal electricity generation is not subject to fuel price volatility and supply disruptions from changes in global energy markets. Geothermal energy systems use a domestic and renewable source of energy. The Geothermal Technologies Program develops innovative technologies to find, access, and use the Nation's geothermal resources. These efforts include emphasis on Enhanced Geothermal Systems (EGS) with continued R&D on geophysical and geochemical exploration technologies, improved drilling systems, and more efficient heat exchangers and condensers. The Geothermal Technologies Program is balanced between short-term goals of greater interest to industry, and long-term goals of importance to national energy interests. The program's research and development activities are expected to increase the number of new domestic geothermal fields, increase the success rate of geothermal well drilling, and reduce the costs of constructing and operating geothermal power plants. These improvements will increase the quantity of economically viable geothermal resources, leading in turn to an increased number of geothermal power facilities serving more energy demand. These new geothermal projects will take advantage of geothermal resources in locations where development is not currently possible or

  13. Preliminary report on the Northern California Power Agency's Notice of Intention to seek certification for NCPA Geothermal Project No. 2

    Energy Technology Data Exchange (ETDEWEB)

    1978-01-01

    This preliminary report on the Northern California Power Agency (NCPA) geothermal power plant proposal has been prepared pursuant to California Public Resources Code Sections 25510, 25512, and 25540. It presents the preliminary Findings of fact and Conclusions adopted by the Commission Committee assigned to conduct proceedings on the Notice. In addition, the report contains a description of the proposed project, a summary of the proceedings to date, and local, state, and Federal government agency comments on the proposal. Finally, the report presents the Committee's view of those issues that require further consideration in future proceedings on the Notice. Pursuant to Public Resources Code Sections 25512 and 25540, the report presents preliminary Findings and Conclusions on: (1) conformity to the forecast of statewide and service area electric power demands; (2) the degree to which the proposed site and facility conform with applicable local, regional, state and Federal standards, ordinances, and laws; and (3) the safety and reliability of the facility.

  14. FY 1974 Report on results of Sunshine Project. Study on physicochemical properties of rocks in geothermal districts; 1974 nendo chinetsu chitai ni okeru ganseki no butsuri kagakuteki tokusei ni kansuru kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1975-03-01

    The geothermal district is characterized by distributions of high temperature and hot water. The beds and rocks in these areas are characteristically altered by these conditions. It is an object of this research and development project to clarify how properties of the beds and rocks in these areas, exposed to the characteristic physicochemical conditions, differ from properties of those in other areas. There are may rock properties. In this project, the studied properties are centered by those used for physical exploitation (or geophysical methods), e.g., electrical properties (electrical exploitation), magnetic properties (magnetic exploitation), and thermal conductivity (measurement of heat flow rates and geothermal gradients). The FY 1974 project covers pigeonholing the basic data, establishment of the experimental procedures, and measurement of water quality characteristics and temperature distributions (geothermal temperature gradients) at the test site. This paper reports the results categorized by (I) measurement of rock resistivity and effects on moisture content on this property, (II) properties of water in the geothermal district (Yahata-daira District), and (III) relationships between rock thermal conductivity and other properties. (NEDO)

  15. Geothermal energy

    Energy Technology Data Exchange (ETDEWEB)

    Gasparovic, N

    1962-07-01

    Live steam, transformed steam, and steam produced by expansion flashing are outlined with respect to their use in the production of electricity. The capacity, pressure, and temperature of a steam must be determined empirically by exploratory drilling. These factors are dependent on time and on the extent of nearby drilling-activity. Particulars of geothermal-steam power-plants such as steam dryness, hot-water flashing, condensation, gas extraction, and corrosion are discussed in detail. All available data (as per 1962) concerning the costs of operation and construction of geothermal power plants are tabulated. For space-heating purposes, two basic systems are utilized. When little corrosion or precipitation is expected, an open system is used, otherwise, closed systems are necessary. The space-heating system of Reykjavik, Iceland is cited as an example. A brief description of industrial applications of geothermal energy, such as the extraction of NaCl, D/sub 2/O, or boric acid, is provided. Thirty-two references are given.

  16. Olympic Dam project: assessment of the environmental impact

    International Nuclear Information System (INIS)

    1983-11-01

    The assessment report on the Environmental Impact Statement produced for the Olympic Dam project is intended to provide the South Australian Government with a comprehensive evaluation of the potential impact of the proposal and to make recommendations concerning the project to be negotiated with the Joint Venturers prior to approval of the EIS. The project involves the mining, processing and sale of products from the copper-uranium ore body at Olympic Dam on the Roxby Downs Station, South Australia. The report includes a description of the proposal, a description of the environment likely to be affected, a discussion of the potential impacts on that environment, a discussion of the adequacy of information presented in the EIS and a discussion of the acceptability of the environmental impacts. The Department has concluded that the pre-design proposal is acceptable on environmental grounds

  17. Management of environmental and radiation data - the Olympic Dam project

    International Nuclear Information System (INIS)

    Jenkins, B.

    1987-01-01

    In terms of data management the Olympic Dam Project is in a process of transition from investigative studies to operational monitoring. The data management requirements for investigative studies are quite different requirements and indicates the progress taken in this transition, as well as the directions being taken to complete this transition. The environmental and radiation management programs for the Olympic Dam Project have already stored 70 megabytes of data on computer. With the comprehensive monitoring requirements which have been, or are in the process of being established for production operations, the volume of data is increasing. There are six main areas involving environmental and radiation data management: project area environmental monitoring; monitoring of the impact pathway from groundwater extraction for water supply to possible effects on mound springs; radiation levels in the environment; radiation exposures to designated employees; other occupational exposures in the mine; medical records relevant to occupational health

  18. Proposed OPEG Namakan River hydro development project draft environmental report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    The Ojibway Power and Energy Group (OPEG) is planning on installing a hydroelectric generating facility along the Namakan River at High Falls in Canada. In order the meet the different requirements in terms of environmental assessment for such a project, the group prepared an environmental report. The aim of this paper is to present the comments of the Quetico Foundation, a charity whose aim is to protect wilderness class parks. The foundation found both general and discipline-by-discipline deficiencies in OPEG's environmental report. All the deficiencies the Foundation observed are listed in this report, general deficiencies, and specific deficiencies concerning fisheries, terrestrial ecology, hydrology and socio-economic impacts. The Quetico Foundation demonstrated that a significant number of deficiencies are found in the OPEG environmental report, suggesting that they did not fully understand the potential long term impacts of their project and that further study should be undertaken.

  19. Salt Lake City Area Integrated Projects: Rate adjustment: Environmental assessment

    International Nuclear Information System (INIS)

    1990-08-01

    The Department of Energy (DOE) has determined that the proposed firm power rate increase for the Salt Lake City Area Integrated Projects (Integrated Projects) power would not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA, 42 USC 4321, et seq.) and, as such, does not require the preparation of an environmental impact statement (EIS). This determination is based on an environmental assessment (EA) prepared by the Western Area Power Administration (Western) dated August 1990 (DOE/EA-0457). The EA identifies and evaluates the potential environmental and socioeconomic effects of the proposed action, and based on the analysis contained therein, DOE concludes that the impacts to the human environment resulting from the implementation of the rate increase would be insignificant

  20. BPA/PGE transmission support project: Final environmental assessment

    International Nuclear Information System (INIS)

    1996-12-01

    This Mitigation Action Plan describes the mitigation measures identified in the BPA/PGE Transmission Support Project Environmental Assessment. These measures commit to actions that will reduce the environmental impacts that could occur by constructing, operating and maintaining the transmission line and related facilities. They have been developed in coordination with environmental specialists, design and construction engineers and maintenance personnel. The measures will be written into the construction specifications for the project, which is expected to be constructed by contract personnel. Unless noted in the plan, the construction inspector or the line foreman would be responsible for carrying out the mitigation; environmental staff would also monitor the area for mitigation effectiveness. The right-of-way would be cleared in 1997 or 1998, and construction would begin in the spring of 1998 and be completed later that fall

  1. Environmental studies and clearance compliance of Kudankulam Atomic Power Project

    International Nuclear Information System (INIS)

    Agarwal, S.K.; Singh, Jitendra

    2002-01-01

    Full text: Nuclear industry has played a leading role in evolving proper and effective environmental management impact from development practices right form inception thus minimizing the environmental impact from developmental activities of man. In the engineering design of nuclear power plant, safety is further enhanced considerably by providing double back-upped engineered safety systems. Besides the engineered safety, the other factors considered for ensuring environmental impact minimization are siting criteria, conservative rad-waste management, effluent treatment, application of stringent environmental protection standards for limiting waste discharges, an elaborate environmental surveillance program and an on site and off site emergency preparedness plan. Recently, nuclear power industry has taken a drive to develop and implement Environmental Management System (EMS) to all its operating stations in line with ISO-14001 standards. For Kudankulam atomic power project, a number of studies specifically for environmental protection are carried out to meet the requirements of Russian Federation, new guidelines of Ministry of environment and Forests (MOEF) and Atomic Energy Regulatory Board (AERB). In the present paper an attempt has been made to present the environmental management plan and clearance compliance status of the project

  2. Near-facility environmental monitoring quality assurance project plan

    International Nuclear Information System (INIS)

    McKinney, S.M.

    1997-01-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near facility environmental monitoring performed by Waste Management Federal Services, Inc., Northwest Operations and supersedes WHC-EP-0538-2. This plan applies to all sampling and monitoring activities performed by waste management Federal Services, Inc., Northwest Operations in implementing facility environmental monitoring at the Hanford Site

  3. Environmental assessment, expanded Ponnequin wind energy project, Weld County, Colorado

    International Nuclear Information System (INIS)

    1999-02-01

    The US Department of Energy (DOE) has considered a proposal from the State of Colorado, Office of Energy Conservation (OEC), for funding construction of the Expanded Ponnequin Wind Project in Weld County, Colorado. OEC plans to enter into a contracting arrangement with Public Service Company of Colorado (PSCo) for the completion of these activities. PSCo, along with its subcontractors and business partners, are jointly developing the Expanded Ponnequin Wind Project. The purpose of this Final Environmental Assessment (EA) is to provide DOE and the public with information on potential environmental impacts associated with the Expanded Ponnequin Wind Energy Project. This EA, and public comments received on it, were used in DOE's deliberations on whether to release funding for the expanded project under the Commercialization Ventures Program

  4. Environmental assessment, expanded Ponnequin wind energy project, Weld County, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-02-01

    The US Department of Energy (DOE) has considered a proposal from the State of Colorado, Office of Energy Conservation (OEC), for funding construction of the Expanded Ponnequin Wind Project in Weld County, Colorado. OEC plans to enter into a contracting arrangement with Public Service Company of Colorado (PSCo) for the completion of these activities. PSCo, along with its subcontractors and business partners, are jointly developing the Expanded Ponnequin Wind Project. The purpose of this Final Environmental Assessment (EA) is to provide DOE and the public with information on potential environmental impacts associated with the Expanded Ponnequin Wind Energy Project. This EA, and public comments received on it, were used in DOE`s deliberations on whether to release funding for the expanded project under the Commercialization Ventures Program.

  5. Uranium Mill Tailings Remedial Action Project. 1995 Environmental Report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    In accordance with U.S. Department of Energy (DOE) Order 23 1. 1, Environment, Safety and Health Reporting, the DOE prepares an annual report to document the activities of the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring program. This monitoring must comply with appropriate laws, regulations, and standards, and it must identify apparent and meaningful trends in monitoring results. The results of all monitoring activities must be communicated to the public. The UMTRA Project has prepared annual environmental reports to the public since 1989.

  6. Uranium Mill Tailings Remedial Action Project. 1995 Environmental Report

    International Nuclear Information System (INIS)

    1996-06-01

    In accordance with U.S. Department of Energy (DOE) Order 23 1. 1, Environment, Safety and Health Reporting, the DOE prepares an annual report to document the activities of the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring program. This monitoring must comply with appropriate laws, regulations, and standards, and it must identify apparent and meaningful trends in monitoring results. The results of all monitoring activities must be communicated to the public. The UMTRA Project has prepared annual environmental reports to the public since 1989

  7. Lower Columbia River Terminal Fisheries Research Project : Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-04-01

    This notice announces BPA`S`s decision to fund the Oregon Department of Fish and Wildlife (ODFW), the Washington Department of Fish and Wildlife (WDFW), and the Clatsop Economic Development Committee for the Lower Columbia River Terminal Fisheries Research Project (Project). The Project will continue the testing of various species/stocks, rearing regimes, and harvest options for terminal fisheries, as a means to increase lower river sport and commercial harvest of hatchery fish, while providing both greater protection of weaker wild stocks and increasing the return of upriver salmon runs to potential Zone 6 Treaty fisheries. The Project involves relocating hatchery smolts to new, additional pen locations in three bays/sloughs in the lower Columbia River along both the Oregon and Washington sides. The sites are Blind Slough and Tongue Point in Clatsop County, Oregon, and Grays Bay/Deep River, Wahkiakum County, Washington. The smolts will be acclimated for various lengths of time in the net pens and released from these sites. The Project will expand upon an existing terminal fisheries project in Youngs Bay, Oregon. The Project may be expanded to other sites in the future, depending on the results of this initial expansion. BPA`S has determined the project is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement is not required, and BPA`S is issuing this FONSI.

  8. Materials selection guidelines for geothermal energy utilization systems

    Energy Technology Data Exchange (ETDEWEB)

    Ellis, P.F. II; Conover, M.F.

    1981-01-01

    This manual includes geothermal fluid chemistry, corrosion test data, and materials operating experience. Systems using geothermal energy in El Salvador, Iceland, Italy, Japan, Mexico, New Zealand, and the United States are described. The manual provides materials selection guidelines for surface equipment of future geothermal energy systems. The key chemical species that are significant in determining corrosiveness of geothermal fluids are identified. The utilization modes of geothermal energy are defined as well as the various physical fluid parameters that affect corrosiveness. Both detailed and summarized results of materials performance tests and applicable operating experiences from forty sites throughout the world are presented. The application of various non-metal materials in geothermal environments are discussed. Included in appendices are: corrosion behavior of specific alloy classes in geothermal fluids, corrosion in seawater desalination plants, worldwide geothermal power production, DOE-sponsored utilization projects, plant availability, relative costs of alloys, and composition of alloys. (MHR)

  9. The Effect of Environmental Science Projects on Students' Environmental Knowledge and Science Attitudes

    Science.gov (United States)

    Al-Balushi, Sulaiman M.; Al-Aamri, Shamsa S.

    2014-01-01

    The current study explores the effectiveness of involving students in environmental science projects for their environmental knowledge and attitudes towards science. The study design is a quasi-experimental pre-post control group design. The sample was 62 11th-grade female students studying at a public school in Oman. The sample was divided into…

  10. Environmental impact assessment for the Nova projects (Building 391 complex)

    International Nuclear Information System (INIS)

    Odell, B.N.

    1979-01-01

    The environmental impact assessment of the Nova projects (Building 391 Complex) describes (1) the proposed actions, (2) the existing environment in and around the Livermore Valley, and (3) the potential environmental impacts from the construction and operation of these facilities. It shows that the proposed action does not conflict with any Federal, State, Regional, or Local Plans and Programs. Possible alternatives to the proposed action are discussed. However, it is concluded that the proposed actions were the most reasonable of the alternatives and would involve relatively minor adverse environmental impacts

  11. West Valley Demonstration Project site environmental report calendar year 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-06-01

    This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1998 by environmental monitoring personnel for the West Valley Demonstration Project (WVDP), West Valley, New York. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. The data collected provide an historical record of radionuclide and radiation levels from natural and manmade sources in the survey area and document the quality of the groundwater on and around the WVDP and the quality of the air and water discharged by the WVDP.

  12. West Valley Demonstration Project site environmental report, calendar year 1999

    Energy Technology Data Exchange (ETDEWEB)

    None Available

    2000-06-01

    This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1999 by environmental monitoring personnel for the West Valley Demonstration Project (WVDP), West Valley, New York. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. The data collected provide an historical record of radionuclide and radiation levels from natural and manmade sources in the survey area and document the quality of the groundwater on and around the WVDP and the quality of the air and water discharged by the WVDP.

  13. West Valley Demonstration Project site environmental report, calendar year 1997

    Energy Technology Data Exchange (ETDEWEB)

    None

    1998-06-01

    This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1997 by environmental monitoring personnel for the West Valley Demonstration Project (WVDP), West Valley, New York. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. The data collected provide an historical record of radionuclide and radiation levels from natural and manmade sources in the survey area and document the quality of the groundwater on and around the WVDP and the quality of the air and water discharged by the WVDP.

  14. The Florida Ranchlands Environmental Services Project: Field Testing a Pay-for-Environmental-Services Program

    OpenAIRE

    Lynch, S.; Shabman, L.

    2007-01-01

    The Florida Ranchlands Environmental Services Project (FRESP) was recently launched, which will field test a program to complement the existing restoration programs such as the Lake Okeechobee Protection Plan (LOPP), which uses public funding to build treatment wetlands, drill aquifer storage, and capture rainwater (to delay its arrival downstream). FRESP will pay cattle ranchers to provide environmental services that will benefit the lake. PES-1 (Payments for Environmental Services Associ...

  15. ENERGY STAR Certified Geothermal Heat Pumps

    Data.gov (United States)

    U.S. Environmental Protection Agency — Certified models meet all ENERGY STAR requirements as listed in the Version 3.1 ENERGY STAR Program Requirements for Geothermal Heat Pumps that are effective as of...

  16. Environmental impact assessment of Kachchh tidal power project

    International Nuclear Information System (INIS)

    Yadav, Ramanand; Lal, B.B.

    1995-01-01

    The Kachchh tidal power development project is a single-basin, single -effect and ebb generation development by construction of a tidal power barrage of about 3.25 km length across Hansthal creek. The project may disturb the ecosystem of the region. The paper deals in detail the environmental impacts of the project on climate, water velocity, flow and sedimentation pattern, water quality, flora and fauna, fishery, tourism and recreation, wild life, public health and socio-economic conditions. (author). 4 refs., 1 fig., 2 tabs

  17. Geothermal Power Generation Plant

    Energy Technology Data Exchange (ETDEWEB)

    Boyd, Tonya [Oregon Inst. of Technology, Klamath Falls, OR (United States). Geo-Heat Center

    2013-12-01

    Oregon Institute of Technology (OIT) drilled a deep geothermal well on campus (to 5,300 feet deep) which produced 196°F resource as part of the 2008 OIT Congressionally Directed Project. OIT will construct a geothermal power plant (estimated at 1.75 MWe gross output). The plant would provide 50 to 75 percent of the electricity demand on campus. Technical support for construction and operations will be provided by OIT’s Geo-Heat Center. The power plant will be housed adjacent to the existing heat exchange building on the south east corner of campus near the existing geothermal production wells used for heating campus. Cooling water will be supplied from the nearby cold water wells to a cooling tower or air cooling may be used, depending upon the type of plant selected. Using the flow obtained from the deep well, not only can energy be generated from the power plant, but the “waste” water will also be used to supplement space heating on campus. A pipeline will be construction from the well to the heat exchanger building, and then a discharge line will be construction around the east and north side of campus for anticipated use of the “waste” water by facilities in an adjacent sustainable energy park. An injection well will need to be drilled to handle the flow, as the campus existing injection wells are limited in capacity.

  18. Wuskwatim generation project : Canadian Environmental Assessment Act comprehensive study report

    International Nuclear Information System (INIS)

    2005-10-01

    This study report described the plan by Manitoba Hydro and the Nisichawayasihk Cree Nation (NCN) to construct a new 200- megawatt (MW) generating station at Taskinigup Falls on the Burntwood River, near the outlet of Wuskwatim Lake. This hydroelectric power project will allow Manitoba Hydro to meet its projected energy needs within the next two decades as identified in its 2002/03 Power Resource Plan. It will also allow Manitoba Hydro and NCN to obtain additional export revenues and profits by advancing the in-service date of the Project from 2020 to 2009. A formal environmental assessment is required under the Canadian Environmental Assessment Act (CEAA) because Fisheries and Oceans Canada (DFO) has determined that the Project would cause fish habitat losses requiring an authorization under the Fisheries Act. Many of the structures to be built in navigable waters would also require formal approval under the Navigable Waters Protection Act (NWPA), which has prompted this application of the CEAA. This environmental assessment report has been prepared by DFO in consultation with Transport Canada and other federal authorities concerned. It provides a summary of the Wuskwatim Generation Project and the environment in which it will be built and operated. In addition, the results of public consultations are discussed. It presents an assessment of the Project's influence on fish and fish habitat, birds, species at risk, human health (local air quality, quality of drinking water and consumption of fishery products), navigation, use of renewable resources, and current use of lands and resources for traditional purposes by Aboriginal persons (hunting, trapping, gathering, subsistence fishing and heritage sites). It was concluded that the proposed Project, as defined by the scope of the study, is not likely to cause significant adverse environmental effects. 45 refs., 5 tabs., 13 figs., 3 appendices

  19. Acceptability of geothermal installations: A geoethical concept for GeoLaB

    OpenAIRE

    Meller , C.; Schill , E.; Bremer , J.; Kolditz , O.; Bleicher , A.; Benighaus , C.; Chavot , Philippe; Gross , M.; Pellizzone , A.; Renn , O.; Schilling , F.; Kohl , T.

    2018-01-01

    International audience; The growing demand for energy, natural resources and urban expansion during the last two centuries increased human interference with the geosphere far beyond geothermal usage. The increasing number of large-scale projects intervening the area of life of communities raised public concerns related to their environmental and social impact. Integration of public concerns into such projects should therefore go beyond outreach and communication measures. It requires an open ...

  20. Environmental cost of using poor decision metrics to prioritize environmental projects.

    Science.gov (United States)

    Pannell, David J; Gibson, Fiona L

    2016-04-01

    Conservation decision makers commonly use project-scoring metrics that are inconsistent with theory on optimal ranking of projects. As a result, there may often be a loss of environmental benefits. We estimated the magnitudes of these losses for various metrics that deviate from theory in ways that are common in practice. These metrics included cases where relevant variables were omitted from the benefits metric, project costs were omitted, and benefits were calculated using a faulty functional form. We estimated distributions of parameters from 129 environmental projects from Australia, New Zealand, and Italy for which detailed analyses had been completed previously. The cost of using poor prioritization metrics (in terms of lost environmental values) was often high--up to 80% in the scenarios we examined. The cost in percentage terms was greater when the budget was smaller. The most costly errors were omitting information about environmental values (up to 31% loss of environmental values), omitting project costs (up to 35% loss), omitting the effectiveness of management actions (up to 9% loss), and using a weighted-additive decision metric for variables that should be multiplied (up to 23% loss). The latter 3 are errors that occur commonly in real-world decision metrics, in combination often reducing potential benefits from conservation investments by 30-50%. Uncertainty about parameter values also reduced the benefits from investments in conservation projects but often not by as much as faulty prioritization metrics. © 2016 Society for Conservation Biology.

  1. Environmental Assessment Expanded Ponnequin Wind Energy Project Weld County, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1999-03-02

    The U.S.Department of Energy (DOE) has considered a proposal from the State of Colorado, Office of Energy Conservation (OEC), for funding construction of the Expanded Ponnequin Wind Project in Weld County, Colorado. OEC plans to enter into a contracting arrangement with Public Service Company of Colorado (PSCO) for the completion of these activities. PSCo, along with its subcontractors and business partners, are jointly developing the Expanded Ponnequin Wind Project. DOE completed an environmental assessment of the original proposed project in August 1997. Since then, the geographic scope and the design of the project changed, necessitating additional review of the project under the National Environmental Policy Act. The project now calls for the possible construction of up to 48 wind turbines on State and private lands. PSCo and its partners have initiated construction of the project on private land in Weld County, Colorado. A substation, access road and some wind turbines have been installed. However, to date, DOE has not provided any funding for these activities. DOE, through its Commercialization Ventures Program, has solicited applications for financial assistance from state energy offices, in a teaming arrangement with private-sector organizations, for projects that will accelerate the commercialization of emerging renewable energy technologies. The Commercialization Ventures Program was established by the Renewable Energy and Energy Efficiency Technology Competitiveness Act of 1989 (P.L. 101-218) as amended by the Energy Policy Act of 1992 (P.L. 102-486). The Program seeks to assist entry into the marketplace of newly emerging renewable energy technologies, or of innovative applications of existing technologies. In short, an emerging renewable energy technology is one which has already proven viable but which has had little or no operational experience. The Program is managed by the Department of Energy, Office of Energy Efficiency and Renewable Energy. The

  2. Environmental education project 'Mico-Estrela Track'

    Energy Technology Data Exchange (ETDEWEB)

    Vicente, Ana Paula Camargo de; Magalhaes, Milton Pinto Magalhaes; Silva, Simone Rodrigues da; Pinheiro, Roberta Vieira Nunes; Torres, Carlos Alberto Rodrigues; Silveira, Jeanete [PETROBRAS Transporte S.A. (TRANSPETRO), Rio de Janeiro, RJ (Brazil)

    2009-12-19

    Senador Canedo fuel storage terminal is situated in the Cerrado biome and implements the policy of promoting improvements in the preservation of its Green Belt by working out the Environmental Education Project 'Mico-Estrela7 Track', aimed at stimulating the preservation, protection, landscape beauty and defense of scientific sources of the Cerrado through environmental sensibilization and rational use of the existing natural resources. In the area of the track (1.5 ha) alone 352 plants have been identified, totaling 97 different species that are distributed in 36 families. The implementation of the project will contribute to strengthen the relations with the local community, like dwellers, teachers and pupils of the municipal network of Senador Canedo, as well as co-workers of the unit, thus reaffirming the commitment of the company to socio-environmental responsibility. (author)

  3. Licensing and Environmental Issues of Wave Energy Projects

    DEFF Research Database (Denmark)

    Neumann, Frank; Tedd, James; Prado, Miguel

    2006-01-01

    a special standing or facilitated access to operating licenses due to their experimental character, the move of wave energy projects towards commercial applications implies complex procedures for obtaining licenses both with respect to the construction and deployment and operation phases, as well......The major non-technical barrier for large-scale wave energy implementation is the wide range of licensing issues and potential environmental concerns, in addition to significant National/regional differences in licensing procedures and permit requirements. Whereas some pilot plants have had...... as concerning ocean space use and environmental concerns. Despite recent efforts to streamline European EIA (Environmental Impact Assessment) in general, potential project developers are far from having a clear view of present and future requirements concerning these barriers on a trans-national level...

  4. Utilization of geothermal energy for methane production for J. A. Albertson Land and Cattle Company. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1980-07-01

    The feasibility of an integrated system to utilize a geothermal resource for a bioconversion plant. This integrated facility would use the manure from approximately 30,000 head of feedlot cattle as a feedstock for an anaerobic digestion plant. The findings on engineering design, geological assessment, environmental, economic, and institutional requirements of the proposed project are summarized. (MHR)

  5. Geothermal Modesty

    International Nuclear Information System (INIS)

    Anon.

    2004-01-01

    This publication of the Areva Group, a world nuclear industry leader, provides information on the energy in many domains. This issue deals with the uses for radioactivity, the future of the green electricity, the energy policy of Rhone-alps region, the end of the nuclear in Belgium, the nuclear propulsion to explore the solar system, the involvement of the Unites States in the hydrogen development, the gas exportation of China. A special part is devoted to the possibility of the geothermal energy. (A.L.B.)

  6. Environmental assessment for the National Conversion Pilot Project, Stage 3

    International Nuclear Information System (INIS)

    1997-01-01

    The purpose of the National Conversion Pilot Project (NCPP) is to explore and demonstrate, at the Rocky Flats Environmental Technology Site (RFETS), the feasibility of economic conversion at Department of Energy facilities. Economic conversion is the conversion of facilities and equipment owned by the Federal government to production of goods by private firms for profit. The NCPP mission is consistent with the RFETS current mission: to conduct site remediation, decontaminate and decommission site buildings and close the site in a manner that is safe, environmentally and socially responsible, physically secure, and cost effective. The NCPP is divided into three stages, with decision points at the ends of Stages 1 and 2 and periodically during Stage 3, to help ensure careful consideration of project effectiveness and to create an opportunity for regulators and stakeholders to provide comments to the DOE. At the end of each stage, the project can be reversed, authorized to proceed, or terminated

  7. Environmental measures for Escuintla No. 3 unit thermal power project

    Energy Technology Data Exchange (ETDEWEB)

    Quisquinay, Carlos; Fabian Rosales, Alejandro [Instituto Nacional de Electrificacion, (Guatemala)

    1996-12-31

    The environmental measures in relation to the project implementation was studied with reference to the Japanese Standards and incorporated in the Implementation Program. This report is prepared however, to review the environmental measures for the project in more detail as to the allowable standards and regulations concerning the measures for the environmental pollution. The authors present the environmental conditions around the Escuintla Power Station in Guatemala; the measures for environmental pollution and evaluation; the measures for prevention of air pollution and diffusion calculations (estimation and assessment of environmental impacts) [Espanol] Las medidas ambientales con relacion a la consolidacion del proyecto, se estudiaron con referencia a los Estandares Japoneses e incorporados en el Programa de Consolidacion. Sin embargo, este reporte ha sido preparado para revisar las medidas ambientales para el proyecto mas detalladamente, con relacion a los estandares y reglamentaciones admisibles concernientes a las medidas de contaminacion ambiental. Los autores presentan las condiciones ambientales en los alrededores de la Central Termoelectrica de Escuintla de Guatemala; las medidas para la prevencion de la contaminacion del aire y los calculos de difusion (estimacion y evaluacion del impacto ambiental)

  8. Environmental measures for Escuintla No. 3 unit thermal power project

    Energy Technology Data Exchange (ETDEWEB)

    Quisquinay, Carlos; Fabian Rosales, Alejandro [Instituto Nacional de Electrificacion, (Guatemala)

    1997-12-31

    The environmental measures in relation to the project implementation was studied with reference to the Japanese Standards and incorporated in the Implementation Program. This report is prepared however, to review the environmental measures for the project in more detail as to the allowable standards and regulations concerning the measures for the environmental pollution. The authors present the environmental conditions around the Escuintla Power Station in Guatemala; the measures for environmental pollution and evaluation; the measures for prevention of air pollution and diffusion calculations (estimation and assessment of environmental impacts) [Espanol] Las medidas ambientales con relacion a la consolidacion del proyecto, se estudiaron con referencia a los Estandares Japoneses e incorporados en el Programa de Consolidacion. Sin embargo, este reporte ha sido preparado para revisar las medidas ambientales para el proyecto mas detalladamente, con relacion a los estandares y reglamentaciones admisibles concernientes a las medidas de contaminacion ambiental. Los autores presentan las condiciones ambientales en los alrededores de la Central Termoelectrica de Escuintla de Guatemala; las medidas para la prevencion de la contaminacion del aire y los calculos de difusion (estimacion y evaluacion del impacto ambiental)

  9. DMRC studies geothermal energy options

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-03-01

    The Deep Mining Research Consortium (DMRC) is an industry-led research consortium that includes Vale Inco, Xstrata, Rio Tinto, Goldcorp, Agnico-Eagle, Barrick Gold, CANMET and the City of Sudbury. This article reported on the application of geothermal energy technologies to cool deep mine workings and use the heat from underground to produce energy to heat surface buildings. Researchers at the University of British Columbia's Centre for Environmental Research in Minerals, Metals and Materials have proposed the use of heat pumps and water-to-air heat exchangers at depth to chill mine workings. The heat pumps would act as refrigerators, taking heat from one area and moving it elsewhere. The purpose would be to extract heat from naturally occurring ground water and pass the chilled water through a heat exchanger to cool the air. The heated water would then be pumped to surface and used to heat surface facilities. The technology is well suited for using geothermal energy from decommissioned mines for district heating. The technology has been successfully used in Spring Hill, Nova Scotia, where geothermal energy from a decommissioned coal mine is used to heat an industrial park. A feasibility study is also underway for the city of Yellowknife in the Northwest Territories to produce up to 10 megawatts of heat from the Con Gold Mine, enough energy to heat half of Yellowknife. Geothermal energy can also be used to generate electricity, particularly in the Pacific Rim where underground temperatures are higher and closer to surface. In Sudbury Ontario, the enhanced geothermal systems technology would require two holes drilled to a depth of four kilometers. The ground between the two holes should be fractured to create an underground geothermal circuit. Geothermal energy does not produce any greenhouse gases or chemical wastes. 1 fig.

  10. Management of the Atmosphere Resource Recovery and Environmental Monitoring Project

    Science.gov (United States)

    Roman, Monsi; Perry, Jay; Howard, David

    2013-01-01

    The Advanced Exploration Systems Program's Atmosphere Resource Recovery and Environmental Monitoring (ARREM) project is working to further optimize atmosphere revitalization and environmental monitoring system architectures. This paper discusses project management strategies that tap into skill sets across multiple engineering disciplines, projects, field centers, and industry to achieve the project success. It is the project's objective to contribute to system advances that will enable sustained exploration missions beyond Lower Earth Orbit (LEO) and improve affordability by focusing on the primary goals of achieving high reliability, improving efficiency, and reducing dependence on ground-based logistics resupply. Technology demonstrations are achieved by infusing new technologies and concepts with existing developmental hardware and operating in a controlled environment simulating various crewed habitat scenarios. The ARREM project's strengths include access to a vast array of existing developmental hardware that perform all the vital atmosphere revitalization functions, exceptional test facilities to fully evaluate system performance, and a well-coordinated partnering effort among the NASA field centers and industry partners to provide the innovative expertise necessary to succeed.

  11. Status report : Terra Nova project environmental assessment panel : recommendations

    International Nuclear Information System (INIS)

    2002-01-01

    An application to the Canada-Newfoundland Offshore Petroleum Board (CNOPB) was submitted by Petro-Canada on August 5, 1996, notifying of its intent to develop the petroleum resources located at the Terra Nova field. The provincial and federal governments jointly appointed the Terra Nova Project Environmental Panel, and the board of the CNOPB referred to it the application documents for review. The environmental effects, considerations of human safety incorporated into the design and operation of the Project, the general approach to the development and exploitation of the petroleum resources, and the employment and industrial benefits expected to be derived from the Project were the issues under review by the Panel. On April 22, 1997, public hearings into the review began, and the final report was submitted to governments and the Board in August 1997. The report included 75 recommendations. The Project was approved in Decision 97.02 in December 1997, and the Board dealt with each of the recommendations. The respective positions of the Governments of Canada and Newfoundland and Labrador with regard to the recommendations that fell outside the jurisdiction of the Board were made public. A status report on every one of the 75 recommendations is provided in the present report. The recommendation is repeated, the verbatim response taken from Decision 97.02 included, followed by the status of the response. The production operations phase of the Project accounts for approximately 65 per cent of the recommendations. January 20, 2002 was the date the Project was begun

  12. INEL Waste and Environmental Information Integration Project approach and concepts

    International Nuclear Information System (INIS)

    Dean, L.A.; Fairbourn, P.J.; Randall, V.C.; Riedesel, A.M.

    1994-06-01

    The Idaho National Engineering, Laboratory (INEL) Waste and Environmental Information integration Project (IWEIIP) was established in December 1993 to address issues related to INEL waste and environmental information including: Data quality; Data redundancy; Data accessibility; Data integration. This effort includes existing information, new development, and acquisition activities. Existing information may not be a database record; it may be an entire document (electronic, scanned, or hard-copy), a video clip, or a file cabinet of information. The IWEIIP will implement an effective integrated information framework to manage INEL waste and environmental information as an asset. This will improve data quality, resolve data redundancy, and increase data accessibility; therefore, providing more effective utilization of the dollars spent on waste and environmental information

  13. Energy source completion for geothermal district heating systems

    International Nuclear Information System (INIS)

    Popovski, Kiril

    2000-01-01

    Geothermal district heating systems differs from the others mainly in the part of energy source completion and its connection to the heat distribution systems rather known problem. Even rather known problematic in the countries where geothermal energy is in wide application, new appearances of mistakes are always present due to the fact that necessary literature is difficult to be found. Essentials of the geothermal well completion and connection of geothermal source to the district heating distribution system are summarized in the paper and several examples of geothermal projects in flow are presented. (Author)

  14. Agribusiness enterprises-cum geothermal energy generation in Naujan, Mindoro: A pre-feasibility analysis

    International Nuclear Information System (INIS)

    Cabanilla, Liborio S.; Corro, Rudy Jr.; Andog, Gerard

    2015-01-01

    A 40MW Geothermal power plant will soon rise in Naujan, Oriental Mindoro. To be managed by the Emerging Power, Inc. (EPI), it covers the political jurisdiction of three villages where 4,219 individuals or 1,021 households reside. Agriculture and fishing are the predominant sources of income of local residents with average daily per capita income of Php50. This is almost 20 percent below the poverty thresholds. Agriculture is coconut-based, intercropped predominantly with banana, and a few fruit trees (e.g. Coffee, cacao). Farming is primarily mountain eco-system and ecologically fragile, as cultivation has now encroached in areas serving sources of potable water for the communities. Sustainability of agricultural production is in jeopardy in view of the need to expand economic opportunities among residents. It is critical that new value-adding activities consistent with the resource endowments of the locality to be developed. The introduction of agri-based social enterprises could pave the way for weaving together the economic requirements of residents and environmental stability. This study provides an analysis of the feasibility of undertaking non-power applications in agriculture and fishery, of geothermal resources in Naujan, Oriental Mindoro. It identifies agribusiness enterprises that will address socio-economic demands of the communities covered by the Geothermal project, at the same time promoting agriculture sustainability. Using both secondary and primary data, it employs simple economic analysis in assessing the effects of directly using geothermal resources in the agribusiness enterprises. Based on available information there is evidence that there are substantial economic benefits from non-power application of geothermal resources in the project site. Copra drying using geothermal heat in place of the traditional “tapahan” system ensures higher product quality and more favorable farm gate prices. New value-adding activities from agro

  15. State policies for geothermal development

    Energy Technology Data Exchange (ETDEWEB)

    Sacarto, D.M.

    1976-01-01

    The most prominent geothermal resources in the USA occur in fifteen Gulf and Western states including Alaska and Hawaii. In each state, authority and guidelines have been established for administration of geothermal leasing and for regulation of development. Important matters addressed by these policies include resource definition, leasing provisions, development regulations, water appropriation, and environmental standards. Some other policies that need attention include taxation, securities regulations, and utility regulations. It is concluded that conditions needed for the geothermal industry to pursue large-scale development are consumer (utility) confidence in the resource; equitable tax treatment; prompt exploration of extensive land areas; long and secure tenure for productive properties; prompt facility siting and development; and competitive access to various consumers. With these conditions, the industry should be competitive with other energy sectors and win its share of investment capital. This publication reviews for the states various technical, economic, and institutional aspects of geothermal development. The report summarizes research results from numerous specialists and outlines present state and Federal policies. The report concludes generally that if public policies are made favorable to their development, geothermal resources offer an important energy resource that could supply all new electric capacity for the fifteen states for the next two decades. This energy--100,000 MW--could be generated at prices competitive with electricity from fossil and nuclear power plants. An extensive bibliography is included. (MCW)

  16. Status of geothermal resources in Mexico

    International Nuclear Information System (INIS)

    Le-Bert, G.

    1990-01-01

    Except for some isolated instances with tourist or therapeutic objectives and some attempts in the Cerro Prieto geothermal field, there are no projects for direct heat utilization of geothermal resources in Mexico. Therefore, all places that are studied are studied with geothermal-electric objectives. It is convenient to keep in mind that in Mexico, by law, the Comision Federal de Electricidad (CFE) is the public utility in charge of electrical energy service. This institution is directly responsible for the exploration, development and commercial use of geothermal energy for electrical generation. Therefore, this paper includes the present and planned exploration and utilization of geothermal resources only for electricity generation for the period 1985 to the present. Likewise, starting 5 years ago, the CFE efforts have been directed toward the development of high enthalpy fields

  17. Fiscal 1999 survey report. Survey of environmental effect pertaining to survey for geothermal development and promotion (Hakusuigoe area); 1999 nendo chinetsu kaihatsu sokushin chosa no uchi kankyo eikyo chosa (Hakusuigoe chiiki) hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This survey of environmental effect was intended to grasp actual state concerning some environmental factors that should agree with survey/development and also to assess its effect on the surrounding environment, particularly as a part of the 'stage C' in the 'survey for geothermal development and promotion', which was implemented by the Government for the purpose of guiding geothermal development by enterprises. This report compiles the plan details of the environmental effect survey to be conducted in the Hakusuigoe district, and presents proposals. The survey area is in the north of Makizono-cho, Aira-gun, in Kagoshima prefecture and situated about 3 km west of Onaminoike in Karakunidake, one of the peaks in the Kirishima mountain range. The Ogiri geothermal power plant is in the west of the site, a tourist spot Ebino Heights about 4 km northeast, and the Kirishima hot-spring about 4 km southeast. The location is in the national park, with a part designated as No. 2 and 3 class special areas. The environmental effect survey was divided broadly into such categories as fauna/flora, hot-spring water alteration and inland water, landscape, noise/vibration/subsoil, and air/water, and was further subdivided in accordance with the actual operations. (NEDO)

  18. Work plan for the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    1989-12-01

    The primary objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that populations could have received from nuclear operations at the Hanford Site since 1944, with descriptions of uncertainties inherent in such estimates. The secondary objective is to make project records--information that HEDR staff members used to estimate radiation doses--available to the public. Preliminary dose estimates for a limited geographic area and time period, certain radionuclides, and certain populations are planned to be available in 1990; complete results are planned to be reported in 1993. Project reports and references used in the reports are available to the public in the DOE Public Reading Room in Richland, Washington. Project progress is documented in monthly reports, which are also available to the public in the DOE Public Reading Room.

  19. Environmental education essentials for project designers in Angola

    Directory of Open Access Journals (Sweden)

    Mbongo Mpaxi

    2015-05-01

    Full Text Available The article provides a selection of essential contents supporting environmental education of project designers in Angola. To attain such objective knowledge; abilities and values to be pursued are listed. The selection was completed by means of a thorough inquire based on the application of analysis and synthesis, historical, logical, inductive, deductive and system methods. The need of Angolan builders of knowing the environmental mpact of constructions is backed up. At the same time, the professional abilities allowing the future graduates to contribute o the preservation of environment during the stages of design, construction, exploitation and demolition of buildings is described.

  20. Cincinnati, Ohio: Two environmental projects in danger of being misunderstood

    International Nuclear Information System (INIS)

    DeJong, K.A.

    1992-01-01

    The Mill Creek Flood Control and the Fernald Decontamination projects are major environmental issues in the (sub)urban setting of Cincinnati. Flood control of the Mill Creek, a tributary of the Ohio River that bisects Cincinnati, was initiated after a flood with $3 million damage in 1959. Its costs were originally estimated at $42 million (1970) and later at $106 million (1976); $110 million has now been spent and the total cost may reach $313 million in the year 2000 (1992 dollars). Benefit/cost ratios ranging between 2.6:1 and 1.6:1 were used to rationalize this project. Flood frequency of the Mill Creek will be discussed. Decontamination of the suburban Fernald site follows manufacturing of nuclear materials from 1953 until 1989. 149 tons of uranium and thorium wastes were released in the air, 83.5 tons to the Greater Miami River and 5,975 tons were placed in pits, all of which are leaking. The cost to cleanup up the local contamination may exceed $10 billion over a time period of 20--30 years, and the calculation of benefit/cost ratios is complex. The hydrology of the Fernald site will be examined. These two environmental projects are run respectively by the Army Corps of Engineers and the US Department of Energy through large industrial contractors. The projects are in danger of becoming like projects of the ''Military-Industrial Complex'' because of the public's ignorance or misinterpretation of the facts; the argument of public safety, and the huge costs. The role of geologists should include edification of the public about the geological aspects of environmental projects

  1. Federal Geothermal Research Program Update, FY 2000

    Energy Technology Data Exchange (ETDEWEB)

    Renner, Joel Lawrence

    2001-08-01

    The Department of Energy's Geothermal Program serves two broad purposes: 1) to assist industry in overcoming near-term barriers by conducting cost-shared research and field verification that allows geothermal energy to compete in today's aggressive energy markets; and 2) to undertake fundamental research with potentially large economic payoffs. The four categories of work used to distinguish the research activities of the Geothermal Program during FY 2000 reflect the main components of real-world geothermal projects. These categories form the main sections of the project descriptions in this Research Update. Exploration Technology research focuses on developing instruments and techniques to discover hidden hydrothermal systems and to explore the deep portions of known systems. Research in geophysical and geochemical methods is expected to yield increased knowledge of hidden geothermal systems. Reservoir Technology research combines laboratory and analytical investigations with equipment development and field testing to establish practical tools for resource development and management for both hydrothermal reservoirs and enhanced geothermal systems. Research in various reservoir analysis techniques is generating a wide range of information that facilitates development of improved reservoir management tools. Drilling Technology focuses on developing improved, economic drilling and completion technology for geothermal wells. Ongoing research to avert lost circulation episodes in geothermal drilling is yielding positive results. Conversion Technology research focuses on reducing costs and improving binary conversion cycle efficiency, to permit greater use of the more abundant moderate-temperature geothermal resource, and on the development of materials that will improve the operating characteristics of many types of geothermal energy equipment. Increased output and improved performance of binary cycles will result from investigations in heat cycle research.

  2. Optimization concept. Utilization of the geothermal resources in D. Podlog - Kochani, R. Macedonia

    International Nuclear Information System (INIS)

    Vasilevska-Popovska, Sanja; Popovski, Kiril

    1999-01-01

    The geothermal system 'Geoterma', near the town Kocani, located in the North-Eastern part of Macedonia, uses heat energy from the geothermal field of the Kocani Valley, which is one of the most important in the Europe. The exploitation of the geothermal resources started 1985/86 by KJP-Vodovod Geoterma. After the production of a cumulative quantity of more than 20 million m 3 thermal water for the purpose of direct heating (greenhouses, district heating), technical problems concerning the re-injection of used water occurred. In 1998 the technical co-operation between the Federal Chancellery of the Republic of Austria and Ministry of Economy of Republic of Macedonia was established to support the project, which will help to improve the technical and environmental situation. (Author)

  3. Geothermal industry position paper: EPA regulatory options and research and development information needs

    Energy Technology Data Exchange (ETDEWEB)

    D' Alessio, G.

    1977-08-01

    The environmental impact of geothermal energy development may be less intense or widespread than that of some other energy sources; however, it is the first example of a number of emerging energy technologies that must be dealt with by EPA. EPA may consider a spectrum of options ranging from a posutre of business as usual to one of immediate setting of standards, as favored by ERDA. The paper discusses the regulatory approaches and the potential problems that geothermal energy may present in the areas of air quality, water quality, and other impacts. It is recommended that a coordinated program of research be drawn up, comprised of specific research projects, the types of geothermal resource to which they apply, and the date by which the information is required.

  4. Geothermal Industry Position Paper: EPA Regulatory Options and Research and Development Information Needs

    Energy Technology Data Exchange (ETDEWEB)

    Swetnam, G.F.

    1976-11-01

    The environmental impact of geothermal energy development may be less intense or widespread than that of some other energy sources; however, it is the first example of a number of emerging energy technologies that must be dealt with by EPA. EPA may consider a spectrum of options ranging from a posture of business as usual to one of immediate setting of standards, as favored by ERDA. The paper discusses the regulatory approaches and the potential problems that geothermal energy may present in the areas of air quality, water quality, and other impacts. It is recommended that a coordinated program of research be drawn up, comprised of specific research projects, the types of geothermal resource to which they apply, and the date by which the information is required.

  5. Geothermal Brief: Market and Policy Impacts Update

    Energy Technology Data Exchange (ETDEWEB)

    Speer, B.

    2012-10-01

    Utility-scale geothermal electricity generation plants have generally taken advantage of various government initiatives designed to stimulate private investment. This report investigates these initiatives to evaluate their impact on the associated cost of energy and the development of geothermal electric generating capacity using conventional hydrothermal technologies. We use the Cost of Renewable Energy Spreadsheet Tool (CREST) to analyze the effects of tax incentives on project economics. Incentives include the production tax credit, U.S. Department of Treasury cash grant, the investment tax credit, and accelerated depreciation schedules. The second half of the report discusses the impact of the U.S. Department of Energy's (DOE) Loan Guarantee Program on geothermal electric project deployment and possible reasons for a lack of guarantees for geothermal projects. For comparison, we examine the effectiveness of the 1970s DOE drilling support programs, including the original loan guarantee and industry-coupled cost share programs.

  6. Decision management for the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    Roberds, W.J.; Haerer, H.A. [Golder Associates, Inc., Redmond, WA (United States); Winterfeldt, D.V. [Decision Insights, Laguna Beach, CA (United States)

    1992-04-01

    The Hanford Environmental Dose Reconstruction (HEDR) Project is in the process of developing estimates for the radiation doses that individuals and population groups may have received as a result of past activities at the Hanford Reservation in Eastern Washington. A formal decision-aiding methodology has been developed to assist the HEDR Project in making significant and defensible decisions regarding how this study will be conducted. These decisions relate primarily to policy (e.g., the appropriate level of public participation in the study) and specific technical aspects (e.g., the appropriate domain and depth of the study), and may have significant consequences with respect to technical results, costs, and public acceptability.

  7. Decision management for the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Roberds, W.J.; Haerer, H.A.; Winterfeldt, D.V.

    1992-04-01

    The Hanford Environmental Dose Reconstruction (HEDR) Project is in the process of developing estimates for the radiation doses that individuals and population groups may have received as a result of past activities at the Hanford Reservation in Eastern Washington. A formal decision-aiding methodology has been developed to assist the HEDR Project in making significant and defensible decisions regarding how this study will be conducted. These decisions relate primarily to policy (e.g., the appropriate level of public participation in the study) and specific technical aspects (e.g., the appropriate domain and depth of the study), and may have significant consequences with respect to technical results, costs, and public acceptability

  8. Report on the results of the Sunshine Project - Verification survey for geothermal exploration technology, etc. Summary. Survey of deep geothermal resource; Chinetsu tansa gijutsu tou kensho chosa. Shinbu chinetsu shigen chosa sokatsu seika hokokusho (Yoyaku)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-03-01

    As to the development of deep geothermal resource which is expected to contribute to increasing the capacity of future power generation in Japan, investigational study was made from FY 1992 to FY 2000, and the results were summed up. The investigational study was conducted for the hydrothermal convection type deep geothermal resource with a thermal conducting heating mechanism, of which Kakkonda is typical, including the drilling of deep exploration well using the existing technology. As a result, new information/knowledge were acquired about the thermal structure, reservoir structure and hydrothermal supply structure of the depths, and a deep geothermal model was made. Based on the model, a detailed simulation was made possible, and a whole image of the hydrothermal convection type deep geothermal resource with the thermal conducting heating mechanism was made clear. In the surface survey, observation of microearthquakes, high-accuracy MT method, etc. were carried out, and a grasp of the shape of a new granite body from the surface was made possible. Concerning the drilling technology, the geologic stratum with a temperature over 500 degrees C was successfully drilled down to a depth of 3,729m by prolonging the life of bit at the time of drilling by introducing the top drive system, the closed mud cooling device, etc. (NEDO)

  9. Environmental agreements in Canada : Aboriginal participation, EIA follow-up and environmental management of major projects

    Energy Technology Data Exchange (ETDEWEB)

    O' Faircheallaigh, C. [Griffith Univ., Brisbane (Australia). Dept. of Politics and Public Policy

    2006-05-15

    Attempts are now being made to address the historic marginalization of indigenous peoples from the management of resource projects located on their ancestral lands through the use of environmental agreements. However, the rapid pace of resource development in certain regions of Canada has meant that there is an increased need to ensure effective follow-up procedures for Environmental Impact Assessment (EIA) processes in order to achieve meaningful Aboriginal participation in the management of large-scale resource projects. Lack of effective follow-up has made it difficult for the relevant agencies to manage risks and uncertainties. This book discussed the use of new policy environmental agreements between industry, government, and Aboriginal peoples. Case studies where environmental agreements were used in the Northwest Territories, Alberta, and Newfoundland were presented in order to demonstrate their efficacy. It was concluded that structures and processes must be designed to encourage Aboriginal participation in consultation processes. refs., tabs.

  10. NEDO Forum 2000. Geothermal technology development session (new development of geothermal energy); Chinetsu gijutsu kaihatsu session. Chinetsu energy no shintenkai

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-09-01

    The following themes were presented at this session: (1) geothermal development in the future, (2) the current status of geothermal development and utilization, (3) surveys on the promotion of geothermal development, and (4) verification and investigation on geothermal exploration technologies, development of hot water utilizing power generation plants, and international cooperation on geothermal development and utilization. In Item 2, report was made on the current status of geothermal power plants in Japan and their future development targets, long-term overview of geothermal development, measures and budgets to achieve the targets of geothermal development. In Item 3, it is reported that out of 48 areas completed of the survey (including the new promotion surveyed areas), the areas possible of steam power generation and confirmed of temperatures higher than 200 degrees C are 30 areas, and the areas possible of binary power generation (using down hole pumps) and small to medium scale power generation, confirmed of temperatures of 100 to 200 degrees C are 13 areas. In Item 4, reports were made on the reservoir bed variation exploring method, surveys on deep geothermal resources, a 10-MW demonstration plant, a system to detect well bottom information during excavation of geothermal wells, a technology to collect deep geothermal resources, and a hot-rock using power generation system. In Item 5, geothermal exploration in remote islands in the eastern part of Indonesia, and the IEA cooperation projects were reported. (NEDO)

  11. Results of preliminary reconnaissance trip to determine the presence of wetlands in wet forest habitats on the Island of Hawaii as part of the Hawaii Geothermal Project, October 1993

    Energy Technology Data Exchange (ETDEWEB)

    Wakeley, J.S.; Sprecher, S.W.; Lichvar, R.

    1994-02-25

    In October 1993, the authors sampled soils, vegetation, and hydrology at eight sites representing a range of substrates, elevations, soil types, and plant community types within rainforest habitats on the Island of Hawaii. Their purpose was to determine whether any of these habitats were wetlands according to the 1987 Corps of Engineers Wetlands Delineation Manual. None of the rainforest habitats they sampled was wetland in its entirety. However, communities established on pahoehoe lava flows contained scattered wetlands in depressions and folds in the lava, where water could accumulate. Therefore, large construction projects, such as that associated with proposed geothermal energy development in the area, have the potential to impact a significant number and/or area of wetlands. To estimate those impacts more accurately, they present a supplementary scope of work and cost estimate for additional sampling in the proposed geothermal project area.

  12. The deep geothermal project in Lavey, Switzerland - Phase B: Technical and financial feasibility study - Synthesis report; Projet de geothermie profonde a Lavey (VD). Phase B : Etude de faisabilite technicofinanciere - Rapport de synthese

    Energy Technology Data Exchange (ETDEWEB)

    Bianchetti, G.; Crestin, G. [Alpgeo Sarl, Sierre (Switzerland); Dewarrat, P.; Perritaz, D. [Energie Concept SA, Bulle, (Switzerland)] [and others

    2009-06-15

    An overview of the deep geothermal project in Lavey, Switzerland is presented. The site is located near the Rhone river, where this river crosses a mountain chain in the Alps. The geology of the region is described. A well known spa is located in Lavey. The aim of the project is to generate power and deliver heat to a local district heating. Two wells should be bored to capture underground water at an appropriate temperature. The present report summarises the previous studies and focuses on the technical and financial feasibility of the future cogeneration plant. In particular, it presents the foreseen installations and the potential heat users. The costs are estimated in several possible boring scenarios. The most promising strategy is similar to that adopted decades ago in the Austrian spa of Bad Blumau. It combines geothermal energy and biomass. A business plan is presented. Recommendations for the next steps are given.

  13. Environmental Audit of the Grand Junction Projects Office

    Energy Technology Data Exchange (ETDEWEB)

    1991-08-01

    The Grand Junction Projects Office (GJPO) is located in Mesa County, Colorado, immediately south and west of the Grand Junction city limits. The US Atomic Energy Commission (AEC) established the Colorado Raw Materials Office at the present-day Grand Junction Projects Office in 1947, to aid in the development of a viable domestic uranium industry. Activities at the site included sampling uranium concentrate; pilot-plant milling research, including testing and processing of uranium ores; and operation of a uranium mill pilot plant from 1954 to 1958. The last shipment of uranium concentrate was sent from GJPO in January, 1975. Since that time the site has been utilized to support various DOE programs, such as the former National Uranium Resource Evaluation (NURE) Program, the Uranium Mill Tailings Remedial Action Project (UMTRAP), the Surplus Facilities Management Program (SFMP), and the Technical Measurements Center (TMC). All known contamination at GJPO is believed to be the result of the past uranium milling, analyses, and storage activities. Hazards associated with the wastes impounded at GJPO include surface and ground-water contamination and potential radon and gamma-radiation exposure. This report documents the results of the Baseline Environmental Audit conducted at Grand Junction Projects Office (GJPO) located in Grand Junction, Colorado. The Grand Junction Baseline Environmental Audit was conducted from May 28 to June 12, 1991, by the Office of Environmental Audit (EH-24). This Audit evaluated environmental programs and activities at GJPO, as well as GJPO activities at the State-Owned Temporary Repository. 4 figs., 12 tabs.

  14. Environmental Audit of the Grand Junction Projects Office

    International Nuclear Information System (INIS)

    1991-08-01

    The Grand Junction Projects Office (GJPO) is located in Mesa County, Colorado, immediately south and west of the Grand Junction city limits. The US Atomic Energy Commission (AEC) established the Colorado Raw Materials Office at the present-day Grand Junction Projects Office in 1947, to aid in the development of a viable domestic uranium industry. Activities at the site included sampling uranium concentrate; pilot-plant milling research, including testing and processing of uranium ores; and operation of a uranium mill pilot plant from 1954 to 1958. The last shipment of uranium concentrate was sent from GJPO in January, 1975. Since that time the site has been utilized to support various DOE programs, such as the former National Uranium Resource Evaluation (NURE) Program, the Uranium Mill Tailings Remedial Action Project (UMTRAP), the Surplus Facilities Management Program (SFMP), and the Technical Measurements Center (TMC). All known contamination at GJPO is believed to be the result of the past uranium milling, analyses, and storage activities. Hazards associated with the wastes impounded at GJPO include surface and ground-water contamination and potential radon and gamma-radiation exposure. This report documents the results of the Baseline Environmental Audit conducted at Grand Junction Projects Office (GJPO) located in Grand Junction, Colorado. The Grand Junction Baseline Environmental Audit was conducted from May 28 to June 12, 1991, by the Office of Environmental Audit (EH-24). This Audit evaluated environmental programs and activities at GJPO, as well as GJPO activities at the State-Owned Temporary Repository. 4 figs., 12 tabs

  15. Microbiological monitoring in geothermal plants

    Science.gov (United States)

    Alawi, M.; Lerm, S.; Vetter, A.; Vieth, A.; Seibt, A.; Wolfgramm, M.; Würdemann, H.

    2009-12-01

    In times of increasing relevance of alternative energy resources the utilization of geothermal energy and subsurface energy storage gains importance and arouses increasing interest of scientists. The research project “AquiScreen” investigates the operational reliability of geothermally used groundwater systems under microbial, geochemical, mineralogical and petrological aspects. Microbiological analyses based on fluid and solid phases of geothermal systems are conducted to evaluate the impact of microbial populations on these systems. The presentation focuses on first results obtained from microbiological monitoring of geothermal plants located in two different regions of Germany: the North German Basin and the Molasse Basin in the southern part characterized by different salinities and temperatures. Fluid and filter samples taken during regular plant operation were investigated using genetic fingerprinting based on PCR-amplified 16S rRNA genes to characterize the microbial biocenosis of the geothermal aquifer. Sequencing of dominant bands of the fingerprints and the subsequent comparison to 16S rRNA genes from public databases enables a correlation to metabolic classes and provides information about the biochemical processes in the deep biosphere. The genetic profiles revealed significant differences in microbiological community structures of geothermal aquifers investigated. Phylogenetic analyses indicate broad metabolical diversity adapted to the specific conditions in the aquifers. Additionally a high amount of so far uncultivated microorganisms was detected indicating very specific indigenous biocenosis. However, in all geothermal plants bacteria were detected despite of fluid temperatures from 45° to 120°C. The identified microorganisms are closely related to thermophilic and hyperthermophilic species detectable in hot wells and hot springs, like Thermus scotoductus and Thermodesulfovibrio yellowstonii, respectively. Halophilic species were detected in

  16. Assessing geothermal energy potential in upstate New York. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Hodge, D.S. [SUNY, Buffalo, NY (United States)

    1996-08-01

    The potential of geothermal energy for future electric power generation in New York State is evaluated using estimates of temperatures of geothermal reservoir rocks. Bottom hole temperatures from over 2000 oil and gas wells in the region were integrated into subsurface maps of the temperatures for specific geothermal reservoirs. The Theresa/Potsdam formation provides the best potential for extraction of high volumes of geothermal fluids. The evaluation of the Theresa/Potsdam geothermal reservoir in upstate New York suggests that an area 30 miles east of Elmira, New York has the highest temperatures in the reservoir rock. The Theresa/Potsdam reservoir rock should have temperatures about 136 {degrees}C and may have as much as 450 feet of porosity in excess of 8%. Estimates of the volumes of geothermal fluids that can be extracted are provided and environmental considerations for production from a geothermal well is discussed.

  17. Sustainable Development of Geothermal Industry in China: An Overview

    Directory of Open Access Journals (Sweden)

    Xu Bang

    2016-01-01

    Full Text Available With a wide distribution, large reserves, low cost, sustainable energy use and environmental protection and other unparalleled advantages, geothermal energy resources is important for China’s energy structure adjustment, energy conservation and environment improvement. Currently, geothermal utilization in China is still in its infancy, and Sustainable Development of the geothermal industry is also having a lot of problems. In this paper, the current research on sustainable development of geothermal industry focuses on two aspects: 1. the current situation of geothermal industry development and existing problems, 2. the current situation of sustainable development of the geothermal industry. On the basis of the review, some suggestions for further study on the sustainable development of geothermal industry are put forward.

  18. Environmental Impact Assessment of a Water Transfer Project

    Directory of Open Access Journals (Sweden)

    Pazoki

    2015-07-01

    Full Text Available Background Reliable water supplies for drinking and agriculture are some of the objectives for the sustainable development of every country. However, constructed facilities such as dams and irrigation networks and drainage can exert positive and negative effects directly or indirectly on the environment. The environmental impact assessment is a method for identifying the positive and negative effects caused by a plan and suggests performance management best practices aimed at lessening the negative impacts and augmenting the positive ones. Objectives The present study sought to evaluate the environmental impacts of the water transfer project of the Jooban Dam in two phases of preparation and operation. Materials and Methods A checklist containing the positive, negative, short-term, and long-term effects as well as the continuation and probable occurrence of these effects was used. Results The results showed that the negative environmental and social impacts of the project outweighed the positive impacts in terms of type, number, and intensity. Conclusions Unless there are well-thought out strategies for minimizing the undesirable impact on the environment, it is not advisable that such projects be permitted.

  19. Environmental management compliance reengineering project, FY 1997 report

    International Nuclear Information System (INIS)

    VanVliet, J.A.; Davis, J.N.

    1997-09-01

    Through an integrated reengineering effort, the Idaho National Engineering and Environmental Laboratory (INEEL) is successfully implementing process improvements that will permit safe and compliant operations to continue during the next 5 years, even though $80 million was removed from the Environmental Management (EM) program budget. A 2-year analysis, design, and implementation project will reengineer compliance-related activities and reduce operating costs by approximately $17 million per year from Fiscal Year (FY) 1998 through 2002, while continuing to meet the INEEL''s environment, safety, and health requirements and milestone commitments. Compliance reengineer''s focus is improving processes, not avoiding full compliance with environmental, safety, and health laws. In FY 1997, compliance reengineering used a three-phase approach to analyze, design, and implement the changes that would decrease operating costs. Implementation for seven specific improvement projects was completed in FY 1997, while five projects will complete implementation in FY 1998. During FY 1998, the three-phase process will be repeated to continue reengineering the INEEL

  20. Willow Creek Wildlife Mitigation Project. Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    Today`s notice announces BPA`s proposal to fund land acquisition or acquisition of a conservation easement and a wildlife management plan to protect and enhance wildlife habitat at the Willow Creek Natural Area in Eugene, Oregon. This action would provide partial mitigation for wildlife and wildlife habitat lost by the development of Federal hydroelectric projects in the Willamette River Basin. The project is consistent with BPA`s obligations under provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 as outlined by the Northwest Power Planning Council`s 1994 Columbia River Basin Fish and Wildlife Program. BPA has prepared an environmental assessment (DOE/EA-1023) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required and BPA is issuing this FONSI.