WorldWideScience

Sample records for generating station tenth

  1. Point Lepreau generating station

    International Nuclear Information System (INIS)

    Ganong, G.H.D.; Strang, A.E.; Gunter, G.E.; Thompson, T.S.

    Point Lepreau-1 reactor is a 600 MWe generating station expected to be in service by October 1979. New Brunswick is suffering a 'catch up' phenomenon in load growth and needs to decrease dependence on foreign oil. The site is on salt water and extensive study has gone into corrosion control. Project management, financing and scheduling have unique aspects. (E.C.B.)

  2. Environmental assessment, proposed generating station for Darlington

    International Nuclear Information System (INIS)

    1975-04-01

    This document indicates the intention of Ontario Hydro to seek approval from the Provincial Government for its plan to construct and operate a 3400 MWe nuclear generating station at the Darlington site, west of Bowmanville. This preliminary proposal also contains the environmental assessment. The environmental section of this proposal describes and assesses the existing environment and the environmental influences which would occur due to the construction and operation of a nuclear generating station, consisting of four 850 MW units, at the Darlington site. This proposed station is similar to the Bruce GS A station presently under construction. (author)

  3. Dose management programmes at Kaiga Generating Station

    International Nuclear Information System (INIS)

    Vijayan, P.; Prabhakaran, V.; Managavi, Sadashiv B.; Danannavar, Veerendra; Biju, P.; Manoj Kumar, M.; Shrikrishna, U.V.

    2001-01-01

    Kaiga Generating Station (KGS) has two units of pressurized heavy water reactors of 220 MWe each capacity. KGS-2 started power generation since 1999 and KGS-1 since 2000. Several programmes such as assessment of radioactive condition, training on radiological safety aspects, job planning in radioactive areas, etc. are conducted periodically to implement an effective dose control programmes in KGS. These efforts are briefly discussed in this report. Facilities and techniques to implement ALARA programs are also highlighted in this report. (author)

  4. Performance assessment of Point Lepreau Generating Station

    International Nuclear Information System (INIS)

    Alikhan, S.

    1991-01-01

    The Point Lepreau Generating Station, a 680 MWe CANDU unit, is located about 40 km southwest of the city of Saint John, New Brunswick, Canada. It was declared in-service on 1 February, 1983 and, since then, has demonstrated an average cross capacity factor of over 93% up to the end of 1990. This paper compared the performance of the station with other sister CANDU units and the Light Water Reactors world-wide using the following ten performance indicators, as applicable: - gross capacity factor; - fuel burn-up; - heavy water upkeep; - unplanned reactor trips while critical; - forced outage rate; - fuel handling performance; - derived emission of radioactive effluents to environment; - personnel radiation dose; - industrial safety; - low-level solid radioactive wastes. The paper examines various areas of station activities including management and organization, operations and maintenance, technical support, fuel handling and health physics in order to highlight some of the 'good practices' which are believed to have made a significant contribution towards achieving the demonstrated performance of Point Lepreau G.S. In addition, several areas of potential improvement are discussed in order to maintain and enhance, where practicable, the safety, reliability and economic performance of the station. In this context, a careful review of the operating experiences, both in-house and at other stations, and a judicious application of lessons learned plays a significant role. (author)

  5. Wolf Creek Generating Station containment model

    International Nuclear Information System (INIS)

    Nguyen, D.H.; Neises, G.J.; Howard, M.L.

    1995-01-01

    This paper presents a CONTEMPT-LT/28 containment model that has been developed by Wolf Creek Nuclear Operating Corporation (WCNOC) to predict containment pressure and temperature behavior during the postulated events at Wolf Creek Generating Station (WCGS). The model has been validated using data provided in the WCGS Updated Safety Analysis Report (USAR). CONTEMPT-LT/28 model has been used extensively at WCGS to support plant operations, and recently, to support its 4.5% thermal power uprate project

  6. 75 FR 9956 - PSEG Nuclear LLC, Hope Creek Generating Station and Salem Nuclear Generating Station, Unit Nos. 1...

    Science.gov (United States)

    2010-03-04

    ... COMMISSION PSEG Nuclear LLC, Hope Creek Generating Station and Salem Nuclear Generating Station, Unit Nos. 1... Station, Unit Nos. 1 and 2 (Salem), and Hope Creek Generating Station (HCGS). The licenses provide, among... life or property or the common defense and security, and are otherwise in the public interest. NRC...

  7. Physical degradation assessment of generator station cables

    International Nuclear Information System (INIS)

    Stonkus, D.J.

    1988-01-01

    Preliminary studies of fossil-fired and nuclear generator station cables indicate that the low voltage PVC insulated cables are in relatively good condition. The insulation is flexible and in the case of nuclear cables can withstand a design basis event after nearly 15 years of service. Cables insulated with styrene butadiene rubber have been found embrittled and cables insulated with SBR should be closely inspected in any plant assurance program. Thermal analysis using oxidative induction technique shows promise to indicate cable insulation degradation. Long term reliability assurance and plant life extension studies are being actively pursued at Ontario Hydro. A major study is currently underway to extend the life of the oldest operating fossil-fuel station, the 8-unit, 2400 MW Lakeview TGS in operation since the 1960s. Plant life assurance programs have been initiated at the 2000 MW Lambton TGS in operation since 1969, and for the oldest operating nuclear plant, Pickering NGS A in operation since the early 1970s. As cables are considered one of the critical components in a generator station due to the extreme difficulty and cost of cable replacement, test programs have been initiated to evaluate the physical degradation of the cables and relate the results to electrical diagnostic tests and to chemical changes. The decommissioning of two small nuclear stations, the 20 MW Nuclear Power Demonstration (NPD) and the 200 MW Douglas Point NGS, which were placed in service in 1962 and 1967 respectively, will provide an opportunity to perform destructive electrical and physical evaluation on field aged cables

  8. Report on Darlington nuclear generating station

    International Nuclear Information System (INIS)

    1985-12-01

    The Select Committee on Energy was appointed on July 10, 1985 by the Legislative Assembly of the Province of Ontario in order to inquire into and report on Ontario Hydro affairs within ten months. Two sessions were planned the first of which was a review of the Darlington Nuclear Generating Station. Darlington is a large, 4 unit nuclear-powered electricity generating station currently under construction on the shore of Lake Ontario in the town of Newcastle. At the time the Committee met, construction had been underway for over four years. The first two units are scheduled to become operational in 1988 and 1989 with the second two scheduled to become operational in 1991 and 1992. The total estimated cost of the station is $10.895 billion of which $3.66 billion has been spent and $3.385 billion has been committed. Though the nuclear industry has been a major area of investment in Ontario over the past decade, the demand for electrical power from nuclear stations has been significantly decreased. This report focusses on the need for Darlington and public policy issues involved in planning and completing it. The Committee proposed the following recommendations: 1) The relationship between the Government of Ontario and Ontario Hydro and their individual responsibilities should be clarified. 2) An independent review of the Ontario Hydro demand/supply options should be carried out. 3) No further significant contracts for Darlington units 3 and 4 should be let for materials not required for construction during the next 6 months while the Committee studies demand and supply options

  9. Limerick Nuclear Generating Station vibration monitoring system

    International Nuclear Information System (INIS)

    Mikulski, R.

    1988-01-01

    Philadelphia Electric Company utilizes a vibration monitoring computer system at its Limerick Nuclear Generating Station to evaluate machine performance. Performance can be evaluated through instantaneous sampling, online static and transient data. The system functions as an alarm monitor, displaying timely alarm data to the control area. The passage of time since the system's inception has been a learning period. Evaluation through continuous use has led to many enhancements in alarm handling and in the acquisition and display of machine data. Due to the system's sophistication, a routine maintenance program is a necessity. This paper describes the system's diagnostic tools and current utilization. System development and maintenance techniques will also be discussed

  10. Refurbishment of Point Lepreau Generating Station

    International Nuclear Information System (INIS)

    Thompson, P.D.; Jaitly, R.; Ichiyen, N.; Petrilli, M.A.

    2004-01-01

    NB Power is planning to conduct an 18-month maintenance outage of the Point Lepreau Generating Station (PLGS) beginning in April 2008. The major activity would be the replacement of all 380 Fuel Channel and Calandria Tube Assemblies and the connecting feeder pipes. This activity is referred to as Retube. NB Power would also take advantage of this outage to conduct a number of repairs, replacements, inspections and upgrades (such as rewinding or replacing the generator, replacement of shutdown system trip computers, replacement of certain valves and expansion joints, inspection of systems not normally accessible, etc). These collective activities are referred to as Refurbishment. This would allow the station to operate for an additional 25 to 30 years. The scope of the project was determined from the outcome of a two-year study involving a detailed condition assessment of the station that examined issues relating to ageing and obsolescence. The majority of the plant components were found to be capable of supporting extended operation without needing replacement or changes. In addition to the condition assessment, a detailed review of Safety and Licensing issues associated with extended operation was performed. This included a review of known regulatory and safety issues, comparison of the station against current codes and standards, and comparison of the station against safety related modifications made to more recent CANDU 6 units. Benefit cost analyses (BCA) were performed to assist the utility in determining which changes were appropriate to include in the project scope. As a Probabilistic Safety Assessment (PSA) for PLGS did not exist at the time, a risk baseline for the station had to be determined for use in the BCA. Extensive dialogue with the Canadian Nuclear Safety Commission staff was also undertaken during this phase. A comprehensive Licensing Framework was produced upon which the CNSC provided feedback to NB Power. This feedback was important in terms of

  11. Environmental radiation measurement around Kaiga Generating Station

    International Nuclear Information System (INIS)

    Shelly, P.G.; Takale, R.A.; Swarnkar, M.; Sahu, S.K.; Pandit, G.G.

    2018-01-01

    Kaiga Generating Station (KGS) is the sixth nuclear power station of DAE situated at Kaiga, near river Kali in Uttar Kannada district of Karnataka. The plant has been in operation since March 2000 and has four units. The fourth unit went critical on 27 November 2010. The two oldest units comprise the west half of the site and the two newer units are adjoining the east side of the site. All of the four units are small-sized CANDU plants of 220 MWe. The gamma radiation monitoring in the region is carried out using Thermoluminescence Dosimeters (TLDs). It was started in late 1989 to generate the data on prevalent external gamma radiation levels in the environs of KGS. During preoperational period twenty-seven locations had been surveyed and the furthest monitoring location was approximately 15 Km from stack. After the power plant started operating, twenty-six monitoring locations were selected for the regular TLD monitoring covering 32 kin. Over the period according to the requirement of the site monitoring locations has been increased to forty. The results of environmental gamma monitoring programme carried out at the KGS sites in terms of annual average dose to public is given in this paper

  12. 77 FR 66484 - PSEG Nuclear LLC; Hope Creek Generating Station and Salem Generating Station, Units 1 and 2...

    Science.gov (United States)

    2012-11-05

    ... COMMISSION PSEG Nuclear LLC; Hope Creek Generating Station and Salem Generating Station, Units 1 and 2... Nos. NPF-57, DPR-70, and DPR-75, which authorize operation of the Hope Creek Generating Station (HCGS... will not endanger life or property or the common defense and security, and are otherwise in the public...

  13. Next Generation Hydrogen Station Composite Data Products: Retail Stations, Data through Quarter 4 of 2016

    Energy Technology Data Exchange (ETDEWEB)

    Sprik, Sam [National Renewable Energy Lab. (NREL), Golden, CO (United States); Kurtz, Jennifer [National Renewable Energy Lab. (NREL), Golden, CO (United States); Ainscough, Chris [National Renewable Energy Lab. (NREL), Golden, CO (United States); Saur, Genevieve [National Renewable Energy Lab. (NREL), Golden, CO (United States); Peters, Michael [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2017-05-31

    This publication includes 86 composite data products (CDPs) produced for next generation hydrogen stations, with data through the fourth quarter of 2016. These CDPs include data from retail stations only.

  14. Next Generation Hydrogen Station Composite Data Products: Retail Stations, Data Through Quarter 3 of 2016

    Energy Technology Data Exchange (ETDEWEB)

    Sprik, Sam [National Renewable Energy Lab. (NREL), Golden, CO (United States); Kurtz, Jennifer [National Renewable Energy Lab. (NREL), Golden, CO (United States); Ainscough, Chris [National Renewable Energy Lab. (NREL), Golden, CO (United States); Saur, Genevieve [National Renewable Energy Lab. (NREL), Golden, CO (United States); Peters, Michael [National Renewable Energy Lab. (NREL), Golden, CO (United States); Jeffers, Matthew [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2017-03-07

    This publication includes 80 composite data products (CDPs) produced in Spring 2016 for next generation hydrogen stations, with data through the third quarter of 2016. These CDPs include data from retail stations only.

  15. Next Generation Hydrogen Station Composite Data Products: Retail Stations, Data through Quarter 2 of 2017

    Energy Technology Data Exchange (ETDEWEB)

    Sprik, Samuel [National Renewable Energy Lab. (NREL), Golden, CO (United States); Kurtz, Jennifer M. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Ainscough, Christopher D. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Saur, Genevieve [National Renewable Energy Lab. (NREL), Golden, CO (United States); Peters, Michael C. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2017-12-05

    This publication includes 92 composite data products (CDPs) produced for next generation hydrogen stations, with data through the second quarter of 2017. These CDPs include data from retail stations only.

  16. System for a displaying at a remote station data generated at a central station and for powering the remote station from the central station

    Science.gov (United States)

    Perry, J. C. (Inventor)

    1980-01-01

    A system for displaying at a remote station data generated at a central station and for powering the remote station from the central station is presented. A power signal is generated at the central station and time multiplexed with the data and then transmitted to the remote station. An energy storage device at the remote station is responsive to the transmitted power signal to provide energizing power for the circuits at the remote station during the time interval data is being transmitted to the remote station. Energizing power for the circuits at the remote station is provided by the power signal itself during the time this signal is transmitted. Preferably the energy storage device is a capacitor which is charged by the power signal during the time the power is transmitted and is slightly discharged during the time the data is transmitted to energize the circuits at the remote station.

  17. Activity transport in nuclear generating stations

    International Nuclear Information System (INIS)

    Mitchell, A.B.

    1975-01-01

    The objective of this paper is to give a basic understanding of the operational limitations caused by radiation fields in the present design of CANDU-PHW reactors. A simple model of activity transport is described, and the significance of various radioisotopes identified. The impact which radiation fields have at the Divisional, Station Manager and Operation levels, is outlined in the context of typical work situations. (author)

  18. International Space Station (ISS) Addition of Hardware - Computer Generated Art

    Science.gov (United States)

    1995-01-01

    This computer generated scene of the International Space Station (ISS) represents the first addition of hardware following the completion of Phase II. The 8-A Phase shows the addition of the S-9 truss.

  19. Automation scope at Roxboro generating station

    International Nuclear Information System (INIS)

    Ipakchi, A.; Chrisler, G.; Damesek, S.; Fields, E.W.; Cook, B.C.; Divakaruni, M.

    1991-01-01

    Many fossil fired power plant have replaced their aging unit control hardware with modern DCS technology. This paper describes a jointly sponsored project by EPRI, Carolina Power and Light Co. (CP and L) and ABB, to implement plant automation functions which would complement DCS technology, and result in improvements in plant operations in terms of heat rate, availability, and operations cost. These will be demonstrated at CP and L's Roxboro Station, a 4 unit coal fired plant with total capacity of nearly 2,477 MW. The scope of this four year project includes installation of a plant-wide information management system, automation of unit testing, implementation of advanced controls, intelligent alarms, operator advisory functions, and a plant-wide simulator, as well as support for plant unit economic dispatch

  20. Radioactive emissions data from Canadian nuclear generating stations

    International Nuclear Information System (INIS)

    1993-03-01

    This document reports on the magnitude of gaseous and liquid emissions from each nuclear generating station in Canada and indicates how these emissions compare with the limits imposed by the Atomic Energy Control Board (AECB). The data show that the levels of emissions from all currently operating nuclear generating stations are well below the values mandated by AECB. Since 1980 no emissions have exceeded 1 percent of those values. (L.L.) 62 figs., 3 tabs

  1. Nuclear power generation modern power station practice

    CERN Document Server

    1971-01-01

    Nuclear Power Generation focuses on the use of nuclear reactors as heat sources for electricity generation. This volume explains how nuclear energy can be harnessed to produce power by discussing the fundamental physical facts and the properties of matter underlying the operation of a reactor. This book is comprised of five chapters and opens with an overview of nuclear physics, first by considering the structure of matter and basic physical concepts such as atomic structure and nuclear reactions. The second chapter deals with the requirements of a reactor as a heat source, along with the diff

  2. ALGORITHM TO CHOOSE ENERGY GENERATION MULTIPLE ROLE STATION

    Directory of Open Access Journals (Sweden)

    Alexandru STĂNESCU

    2014-05-01

    Full Text Available This paper proposes an algorithm that is based on a complex analysis method that is used for choosing the configuration of a power station. The station generates electric energy and hydrogen, and serves a "green" highway. The elements that need to be considered are: energy efficiency, location, availability of primary energy sources in the area, investment cost, workforce, environmental impact, compatibility with existing systems, meantime between failure.

  3. Naturalization of landscaped parkland at Ontario Hydro's Nanticoke generating station

    International Nuclear Information System (INIS)

    McKenna, G.R.

    1998-01-01

    The implementation of a program for the naturalization of Nanticoke Park, a 30 hectare area located on the property of Ontario Hydro's Nanticoke Generating Station was discussed. The station, which is located in southern Ontario very near to noted wildlife areas, is the largest coal-fired generating station in North America. Naturalization of Nanticoke Park began with passive naturalization of interior areas. An active naturalization program involving four to five hectare size areas annually was begun in 1997, to be completed over a five -year period. This presentation described the site preparation, planting methods, post-planting tending methods, survival assessment of planted areas, and scientific research initiatives including mulch trials with zebra mussel shells to increase soil moisture. The lessons learned from the two year experiment in determining the optimum planting strategy and methods were described. 7 refs., 1 tab

  4. Valve maintainability in CANDU-PHW nuclear generating stations

    International Nuclear Information System (INIS)

    Pothier, N.E.; Crago, W.A.

    1977-09-01

    Design, application, layout and administrative factors which affect valve maintainability in CANDU-PHW power reactors are identified and discussed. Some of these are illustrated by examples based on prototype reactor operation experience. Valve maintainability improvements resulting from laboratory development and maintainability analysis, have been incorporated in commercial CANDU-PHW nuclear generating stations. These, also, are discussed and illustrated. (author)

  5. Trends in the capital costs of CANDU generating stations

    International Nuclear Information System (INIS)

    Yu, A.M.

    1983-01-01

    This paper consolidates the actual cost experience gained by Atomic Energy of Canada Limited, Ontario Hydro, and other Canadian electric utilities in the planning, design and construction of CANDU-PHWR (CANada Deuterium Uranium-Pressurized Heavy Water Reactor) generating stations over the past 30 years. For each of the major CANDU-PHWR generating stations in operation and under construction in Canada, an analysis is made to trace the evolution of the capital cost estimates. Major technical, economic and other parameters that affect the cost trends of CANDU-PHWR generating stations are identified and their impacts assessed. An analysis of the real cost of CANDU generating stations is made by eliminating interest during construction and escalation and the effects of planned deferment of in-service dates. An historical trend in the increase in the real cost of CANDU power plants is established. Based on the cost experience gained in the design and construction of CANDU-PHWR units in Canada, as well as on the assessment of parameters that influence the costs of such projects, the future costs of CANDU-PHWRs are presented. (author)

  6. Trends in the capital costs of CANDU generating stations

    International Nuclear Information System (INIS)

    Yu, A.M.

    1982-09-01

    This paper consolidates the actual cost experience gained by Atomic Energy of Canada Limited, Ontario Hydro, and other Canadian electric utlities in the planning, design and construction of CANDU-PHWR (CANada Deuterium Uranium-Pressurized Heavy Water Reactor) generating stations over the past 30 years. For each of the major CANDU-PHWR generating stations in operation and under construction in Canada, an analysis is made to trace the evolution of the capital cost estimates. Major technical, economic and other parameters that affect the cost trends of CANDU-PHWR generating stations are identified and their impacts assessed. An analysis of the real cost of CANDU generating stations is made by eliminating interest during construction and escalation, and the effects of planned deferment of in-service dates. An historical trend in the increase in the real cost of CANDU power plants is established. Based on the cost experience gained in the design and construction of CANDU-PHWR units in Canada, as well as on the assessment of parameters that influence the costs of such projects, the future costs of CANDU-PHWRs are presented

  7. Ontario Hydro Pickering Generating Station fuel handling system performance

    International Nuclear Information System (INIS)

    Underhill, H.J.

    1986-01-01

    The report briefly describes the Pickering Nuclear Generating Station (PNGS) on-power fuel handling system and refuelling cycle. Lifetime performance parameters of the fuelling system are presented, including station incapability charged to the fuel handling system, cost of operating and maintenance, dose expenditure, events causing system unavailability, maintenance and refuelling strategy. It is concluded that the 'CANDU' on-power fuelling system, by consistently contributing less than 1% to the PNGS incapability, has been credited with a 6 to 20% increase in reactor capacity factor, compared to off-power fuelling schemes. (author)

  8. Tritium in groundwater investigation at the Pickering Nuclear Generating Station

    International Nuclear Information System (INIS)

    DeWilde, J.; Yu, L.; Wootton, R.; Belanger, D.; Hansen, K.; McGurk, E.; Teare, A.

    2001-01-01

    Ontario Power Generation Inc. (OPG) investigated tritium in groundwater at the Pickering Nuclear Generating Station (PNGS). The objectives of the study were to evaluate and define the extent of radionuclides, primarily tritium, in groundwater, investigate the causes or sources of contamination, determine impacts on the natural environment, and provide recommendations to prevent future discharges. This paper provides an overview of the investigations conducted in 1999 and 2000 to identity the extent of the tritium beneath the site and the potential sources of tritium released to the groundwater. The investigation and findings are summarized with a focus on unique aspects of the investigation, on lessons learned and benefits. Some of the investigative techniques discussed include process assessments, video inspections, hydrostatic and tracer tests, Helium 3 analysis for tritium age dating, deuterium and tritium in soil analysis. The investigative techniques have widespread applications to other nuclear generating stations. (author)

  9. Electricity pricing model in thermal generating stations under deregulation

    International Nuclear Information System (INIS)

    Reji, P.; Ashok, S.; Moideenkutty, K.M.

    2007-01-01

    In regulated public utilities with competitive power markets, deregulation has replaced the monopoly. Under the deregulated power market, the electricity price primarily depends on market mechanism and power demand. In this market, generators generally follow marginal pricing. Each generator fixes the electricity price based on their pricing strategy and it leads to more price volatility. This paper proposed a model to determine the electricity price considering all operational constraints of the plant and economic variables that influenced the price, for a thermal generating station under deregulation. The purpose of the model was to assist existing stations, investors in the power sector, regulatory authorities, transmission utilities, and new power generators in decision-making. The model could accommodate price volatility in the market and was based on performance incentive/penalty considering plant load factor, availability of the plant and peak/ off peak demand. The model was applied as a case study to a typical thermal utility in India to determine the electricity price. It was concluded that the case study of a thermal generating station in a deregulated environment showed that the electricity price mainly depended on the gross calorific value (GCV) of fuel, mode of operation, price of the fuel, and operating charges. 11 refs., 2 tabs., 1 fig

  10. The Misema generating station by CREC : the journey

    International Nuclear Information System (INIS)

    2003-01-01

    The Canadian Renewable Energy Corporation (CREC) was created in 2000 in response to the government's commitment to renewable energy. This publication presents a series of photographs illustrating the development of the Misema run-of-the river hydro generating station, including its 300 m long power tunnel from the intake to the powerhouse. The Misema project was the first in Ontario to run an underground tunnel to protect the river bank and reduce visual impact. It was also the first to have an underground power house that could withstand the 1 in 1,000 year flood. Connection to the grid is via a private 44,000 volt line. The station is fully automated to meet Ontario's power demand. Engineering and environmental approval for the project began in 2001, with construction starting in May 2001. The generating facility uses natural river flow to generate electricity, and is expected to play an important role in strengthening the electricity grid at its periphery and offer reliable power to thousands of customers. Small hydro also has minimal impact on the environment. CREC intends to make the site accessible to recreational canoeists, fishermen, geologists and tourists. The generating station was nearly completely constructed by local tradesmen and contractors, creating about 30,000 man-hours for the Englehart area. The Misema facility is contributing to Ontario's deregulated power market and has provided much needed electricity while reducing Ontario's greenhouse gas emissions. The facility was built to the highest international standards. figs

  11. Navajo Generating Station and Air Visibility Regulations: Alternatives and Impacts

    Energy Technology Data Exchange (ETDEWEB)

    Hurlbut, D. J.; Haase, S.; Brinkman, G.; Funk, K.; Gelman, R.; Lantz, E.; Larney, C.; Peterson, D.; Worley, C.; Liebsch, E.

    2012-01-01

    Pursuant to the Clean Air Act, the U.S. Environmental Protection Agency (EPA) announced in 2009 its intent to issue rules for controlling emissions from Navajo Generating Station that could affect visibility at the Grand Canyon and at several other national parks and wilderness areas. The final rule will conform to what EPA determines is the best available retrofit technology (BART) for the control of haze-causing air pollutants, especially nitrogen oxides. While EPA is ultimately responsible for setting Navajo Generating Station's BART standards in its final rule, it will be the U.S. Department of the Interior's responsibility to manage compliance and the related impacts. This study aims to assist both Interior and EPA by providing an objective assessment of issues relating to the power sector.

  12. Visibility in the Grand Canyon and the Navajo Generating Station

    International Nuclear Information System (INIS)

    Rojas, A.A.; Lusko, J.

    1990-01-01

    Attribution of visibility impairment is a complex science and is very difficult, if not impossible, to quantify at times. This paper discusses the chronology of events leading to the agreement between various national environmental groups and the participants of the Navajo Generating Station to install sulfur dioxide scrubbers on the three 750 MW units at Navajo. The events leading to the involvement of the Environmental Protection Agency and the approach they used to develop their rulemaking finding are described in detail. Reactions of the participants of the Navajo Generating Station and the approach used to respond to the Environmental Protection Agency actions are reviewed. Both the environmental groups and the participants had important objectives when developing strategies prior to entry into the negotiation process. These objectives and strategies that resulted in a win-win settlement which was endorsed by the Environmental Protection Agency and incorporated into the final rulemaking are discussed

  13. Next-Generation GPS Station for Hazards Mitigation (Invited)

    Science.gov (United States)

    Bock, Y.

    2013-12-01

    Our objective is to better forecast, assess, and mitigate natural hazards, including earthquakes, tsunamis, and extreme storms and flooding through development and implementation of a modular technology for the next-generation in-situ geodetic station to support the flow of information from multiple stations to scientists, mission planners, decision makers, and first responders. The same technology developed under NASA funding can be applied to enhance monitoring of large engineering structures such as bridges, hospitals and other critical infrastructure. Meaningful warnings save lives when issued within 1-2 minutes for destructive earthquakes, several tens of minutes for tsunamis, and up to several hours for extreme storms and flooding, and can be provided by on-site fusion of multiple data types and generation of higher-order data products: GPS/GNSS and accelerometer measurements to estimate point displacements, and GPS/GNSS and meteorological measurements to estimate moisture variability in the free atmosphere. By operating semi-autonomously, each station can then provide low-latency, high-fidelity and compact data products within the constraints of narrow communications bandwidth that often accompanies natural disasters. We have developed a power-efficient, low-cost, plug-in Geodetic Module for fusion of data from in situ sensors including GPS, a strong-motion accelerometer module, and a meteorological sensor package, for deployment at existing continuous GPS stations in southern California; fifteen stations have already been upgraded. The low-cost modular design is scalable to the many existing continuous GPS stations worldwide. New on-the-fly data products are estimated with 1 mm precision and accuracy, including three-dimensional seismogeodetic displacements for earthquake, tsunami and structural monitoring and precipitable water for forecasting extreme weather events such as summer monsoons and atmospheric rivers experienced in California. Unlike more

  14. Online control loop tuning in Pickering Nuclear Generating Stations

    International Nuclear Information System (INIS)

    Yu, K.X.; Harrington, S.

    2008-01-01

    Most analog controllers in the Pickering B Nuclear Generating Stations adopted PID control scheme. In replacing the analog controllers with digital controllers, the PID control strategies, including the original tuning parameters were retained. The replacement strategy resulted in minimum effort on control loop tuning. In a few cases, however, it was found during commissioning that control loop tuning was required as a result of poor control loop performance, typically due to slow response and controlled process oscillation. Several factors are accounted for the necessities of control loop re-tuning. Our experience in commissioning the digital controllers showed that online control tuning posted some challenges in nuclear power plant. (author)

  15. Probabilistic seismic hazard assessment for Point Lepreau Generating Station

    Energy Technology Data Exchange (ETDEWEB)

    Mullin, D. [New Brunswick Power Corp., Point Lepreau Generating Station, Lepreau, New Brunswick (Canada); Lavine, A. [AMEC Foster Wheeler Environment and Infrastructure Americas, Oakland, California (United States); Egan, J. [SAGE Engineers, Oakland, California (United States)

    2015-09-15

    A Probabilistic Seismic Hazard Assessment (PSHA) has been performed for the Point Lepreau Generating Station (PLGS). The objective is to provide characterization of the earthquake ground shaking that will be used to evaluate seismic safety. The assessment is based on the current state of knowledge of the informed scientific and engineering community regarding earthquake hazards in the site region, and includes two primary components-a seismic source model and a ground motion model. This paper provides the methodology and results of the PLGS PSHA. The implications of the updated hazard information for site safety are discussed in a separate paper. (author)

  16. Probabilistic tsunami hazard assessment for Point Lepreau Generating Station

    Energy Technology Data Exchange (ETDEWEB)

    Mullin, D., E-mail: dmullin@nbpower.com [New Brunswick Power Corporation, Point Lepreau Generating Station, Point Lepreau (Canada); Alcinov, T.; Roussel, P.; Lavine, A.; Arcos, M.E.M.; Hanson, K.; Youngs, R., E-mail: trajce.alcinov@amecfw.com, E-mail: patrick.roussel@amecfw.com [AMEC Foster Wheeler Environment & Infrastructure, Dartmouth, NS (Canada)

    2015-07-01

    In 2012 the Geological Survey of Canada published a preliminary probabilistic tsunami hazard assessment in Open File 7201 that presents the most up-to-date information on all potential tsunami sources in a probabilistic framework on a national level, thus providing the underlying basis for conducting site-specific tsunami hazard assessments. However, the assessment identified a poorly constrained hazard for the Atlantic Coastline and recommended further evaluation. As a result, NB Power has embarked on performing a Probabilistic Tsunami Hazard Assessment (PTHA) for Point Lepreau Generating Station. This paper provides the methodology and progress or hazard evaluation results for Point Lepreau G.S. (author)

  17. Optimization of air ducts for nuclear reactor power generation station

    International Nuclear Information System (INIS)

    Hirao, Katsumi; Yoshino, Hirokazu; Sonoda, Takayuki

    1991-01-01

    In the optimization study on the heating, ventilating and air conditions system in Nuclear Reactor Power Generation Station, proper arrangement of air ducts has been studied using the experimental and analytical investigation from a viewpoint of duct arrangement optimization. This study consists of two parts. Part I is optimization of air ducts in the corridors and Part II is optimization of air duct in each room. In part I, from viewpoints of confinement of radioactive materials in facilities having possible radioactive contamination and improvement of thermal environment for workers, the authors have studied air ducts system in which fresh air is supplied to corridors and heat removal and ventilation for each room are performed by transferring air from the corridors, instead of current ducts system with supply duct to each room. In part II, the condenser room with complex configuration and large space, and the electrical equipment room with simple space are selected for model areas. Based on these studies, experimental and analytical investigation (using a three-dimensional thermal hydraulic analysis) technique has been established, and the effective design method for duct arrangement of HVAC design has been verified for Boiling Water Reactor Power Station. The air-duct arrangements optimized in this study are applied to an Advanced Boiling Water Reactor Power Station in trial and reduction of the air-duct quantity is confirmed

  18. Steam generator replacement at the Obrigheim nuclear power station

    International Nuclear Information System (INIS)

    Pickel, E.; Schenk, H.; Huemmler, A.

    1984-01-01

    The Obrigheim Nuclear Power Station (KWO) is equipped with a dual-loop pressurized water reactor of 345 MW electric power; it was built by Siemens in the period 1965 to 1968. By the end of 1983, KWO had produced some 35 billion kWh in 109,000 hours of operation. Repeated leaks in the heater tubes of the two steam generators had occurred since 1971. Both steam generators were replaced in the course of the 1983 annual revision. Kraftwerk Union AG (KWU) was commissioned to plant and carry out the replacement work. Despite the leakages the steam generators had been run safely and reliably over a period of 14 years until their replacement. Replacing the steam generators was completed within twelve weeks. In addition to the KWO staff and the supervising crew of KWU, some 400 external fitters were employed on the job at peak work-load periods. For the revision of the whole plant, work on the emergency systems and replacement of the steam generators a maximum number of approx. 900 external fitters were employed in the plant in addition to some 250 members of the plant crew. The exposure dose of the personnel sustained in the course of the steam generator replacement was 690 man-rem, which was clearly below previous estimates. (orig.) [de

  19. Heat exchanger tubing materials for CANDU nuclear generating stations

    International Nuclear Information System (INIS)

    Taylor, G.F.

    1977-07-01

    The performance of steam generator tubing (nickel-chromium-iron alloy in NPD and nickel-copper alloy in Douglas Point and Pickering generating stations) has been outstanding and no corrosion-induced failures have occurred. The primary coolant will be allowed to boil in the 600 MW (electrical) CANDU-PHW reactors. An iron-nickel-chromium alloy has been selected for the steam generator tubing because it will result in lower radiation fields than the alloys used before. It is also more resistant than nickel-chromium-iron alloy to stress corrosion cracking in the high purity water of the primary circuit, an unlikely but conceivable hazard associated with higher operating temperatures. Austenitic alloy and ferritic-austenitic stainless steel tubing have been selected for the moderator coolers in CANDU reactors being designed and under construction. These materials will reduce the radiation fields around the moderator circuit while retaining the good resistance to corrosion in service water that has characterized the copper-nickel alloys now in use. Brass and bronze tubes in feedwater heaters and condensers have given satisfactory service but do, however, complicate corrosion control in the steam cycle and, to reduce the transport of corrosion products from the feedtrain to the steam generator, stainless steel is preferred for feedwater heaters and stainlss steel or titanium for condensers. (author)

  20. Steam generator maintenance and life management at Embalse Nuclear Station

    International Nuclear Information System (INIS)

    Sainz, R.; Diaz, G.; Sveruga, H.; Ramakrishnan, T.K.; Azeez, S.

    2004-01-01

    The Embalse Nuclear Station has four steam generators (SGs) with inverted vertical U tubes manufactured by Babcock and Wilcox Canada (B and W). These are main components, both from the operative point of view as the heat transfer from the Primary Heat Transport System (PHTS) to the Secondary System, and from the point of view of safety, as they are the part of the PHTS and its radioactive inventory pressure barrier. In addition, they are one of the most important cost-related elements for potential life extensions. Maintenance and inspections are carried out in order to maintain a high availability of the SGs, as they have had a positive impact on the operational availability of the plant, and to reduce the tube failure probabilities, thus minimizing the amount of radioactive effluents and taking care of the condition of the main components in order to enable the plant life management and the planning of the plant life extension. The most relevant maintenance activities performed have been the inspections performed on 100% of the tubes every 3 years. the mechanical cleaning of the inside of the tubes, the sludge removal from the secondary side tubesheet, the divider plate replacement, and the inspection of internals of the secondary side.Thanks to the latter and to the eddy current inspections, the degradation in the U-bend supports was detected early and every effort is being made to repair them shortly. Besides, a life management program has been started covering the entire plant starting with this important component. The Embalse Nuclear Station's SGs show a low percentage of plugged tubes compared to other stations in similar conditions, but they must be monitored continually and systematically if a life extension is intended. (author)

  1. 76 FR 19795 - Exelon Generation Company, LLC; Oyster Creek Nuclear Generating Station; Exemption

    Science.gov (United States)

    2011-04-08

    ... based on the loads that are lost (e.g., control room ventilation, service water pump, etc.) and a fire... licensee stated that they conservatively assume that instrument air is lost for all Appendix R fires based... the Oyster Creek Nuclear Generating Station (Oyster Creek). The license provides, among other things...

  2. Aging assessment of electrical cables from NPD nuclear generating station

    International Nuclear Information System (INIS)

    Stonkus, D.J.; Anandakumaran, K.

    1991-05-01

    Degradation of NPD Nuclear Generating Station control and power cables after approximately 25 years of service was assessed. The PVC and SBR insulated cables were also exposed to radiation, accident and post-accident conditions, and accelerated aging to simulate extended service life. The degradation of the samples from the containment boiler room was minimal, caused mainly by thermal conditions rather than radiation. Although irradiation to 55 Mrad, simulating normal operation and accident radiation levels, caused degradation, the cables could still function during accident and post-accident conditions. Accelerated thermal aging to simulate an additional 10 years of service at 45 degrees C caused embrittlement of the PVC and a 60% decrease in elongation of the SBR. Comparison of test results of aged NPD cables with newer PVC cables obtained from Pickering NGS 'A' shows that the newer cables have improved aging stability and therefore should provide adequate service during their design life of 31 years

  3. Improving nuclear generating station response for electrical grid islanding

    International Nuclear Information System (INIS)

    Chou, Q.B.; Kundur, P.; Acchione, P.N.; Lautsch, B.

    1989-01-01

    This paper describes problems associated with the performance characteristics of nuclear generating stations which do not have their overall plant control design functions co-ordinated with the other grid controls. The paper presents some design changes to typical nuclear plant controls which result in a significant improvement in both the performance of the grid island and the chances of the nuclear units staying on-line following the disturbance. This paper focuses on four areas of the overall unit controls and turbine governor controls which could be modified to better co-ordinate the control functions of the nuclear units with the electrical grid. Some simulation results are presented to show the performance of a typical electrical grid island containing a nuclear unit with and without the changes

  4. Public response to the Diablo Canyon Nuclear Generating Station

    International Nuclear Information System (INIS)

    Pijawka, K.D.

    1982-01-01

    The authors examine the nature of the public response to the Diablo Canyon Nuclear Generating Station located in San Luis Obispo, California, from the early 1960s to the present. Four distinct phases of public intervention were discerned, based on change in both plant-related issues and in the nature of the antinuclear constituencies in the region. The level of public concern varied both geographically and temporally and is related to the area's social structure, environmental predispositions, and distribution of plant-related economic benefits. External events, such as the prolonged debate over the risk assessment of the seismic hazard and the Three Mile Island accident were found to be important factors in explaining variation in public concern and political response

  5. Public response to the Diablo Canyon Nuclear Generating Station

    International Nuclear Information System (INIS)

    Pijawka, K.D.

    1982-01-01

    We examine the nature of the public response to the Diablo Canyon Nuclear Generating Station located in San Luis Obispo, California, from the early 1960s to the present. Four distinct phases of public intervention were discerned, based on change in both plant-related issues and in the nature of the antinuclear constituencies in the region. The level of public concern varied both geographically and temporally and is related to the area's social structure, environmental predispositions, and distribution of plant-related economic benefits. External events, such as the prolonged debate over the risk assessment of the seismic hazard and the Three Mile Island accident were found to be important factors in explaining variation in public concern and political response. (author)

  6. Safety design of next generation SUI of CANDU stations

    International Nuclear Information System (INIS)

    Nasimi, Elnara; Gabbar, Hossam A.

    2013-01-01

    Highlights: ► Review of current SUI technologies and challenges. ► Propose a new type of SUI detectors. ► Propose a new SUI system architecture and layout. ► Propose implementation procedure for SUI with reduced risks. - Abstract: Due to the age and operating experience of Nuclear Power Plants, equipment ageing and obsolescence has become one of the main challenges that need to be resolved for all systems, structures and components in order to ensure a safe and reliable production of energy. This paper summarizes the research into a methodology for modernization of Start-Up Instrumentation (SUI), both in-core and Control Room equipment, using a new generation of detectors and cables in order to manage obsolescence. The main objective of this research is to develop a new systematic approach to SUI installation/replacement procedure development and optimization. Although some additional features, such as real-time data monitoring and storage/archiving solutions for SUI systems are also examined to take full advantage of today's digital technology, the objectives of this study do not include detailed parametrical studies of detector or system performance. Instead, a number of technological, operational and maintenance issues associated with Start-Up Instrumentation systems at Nuclear Power Plants (NPPs) will be identified and a structured approach for developing a replacement/installation procedure that can be standardized and used across all of the domestic CANDU (Canadian Deuterium Uranium) stations is proposed.

  7. Mattagami River Lake sturgeon entrainment : Little Long generating station facilities

    International Nuclear Information System (INIS)

    Seyler, J.; Evers, J.; McKinley, S.; Evans, R.R.; Prevost, G.; Carson, R.; Phoenix, D.

    1996-01-01

    This project and publication is the result of a collaborative effort by other Large River Ecosystem Unit of Northeast Science (NEST), Ontario Hydro in Kapuskasing, and the New Post First Nation in Cochrane, Ontario, designed to investigate potential solutions to minimize or eliminate the problem of trapped lake sturgeon in the Adam Creek Diversion. The Adam Creek Dam is used to divert excess water from the Mattagami River hydroelectric complex which consists of the Little Long, Smoky Falls, Harmon and Kipling generating stations. The lake sturgeon entrainment problem in the area was discovered in 1990. Potential solutions to the problem include the redirection of flows to mainstream, the placement of a rope barrier, electrical deterrents, physical/electrical guidance systems, sound deterrents, gate modifications, and the continued relocation of fish. The advantages and disadvantages of each of these potential solutions are discussed. Results of the analysis indicated that perceptual and physical barriers have the greatest potential to minimize lake sturgeon entrainment in Adam Creek. 25 refs., 2 tabs., 3 figs., 6 appendices

  8. Chemistry control experiences at Kaiga Generating Station (KGS), NPCIL

    International Nuclear Information System (INIS)

    Harikrishna, K.; Somasundaram, K.M.; Sanathkumar, V.V.; Nageswara Rao, G.

    2006-01-01

    The Chemistry control section at Kaiga Generating Station (KGS), NPCIL had keenly pursued many developmental works and projects which had not only improved the system performance and reliability but also largely benefited the Station by many ways. The highlights of some of the major developmental works that have contributed significantly are: 1. Studies on frequent and sharp rise in dew point values of AGMS: In the Annulus Gas Monitoring Systems (AGMS) of KGS units, it was observed that the system dew points were rising very sharply and abruptly. The systematic studies revealed the presence of Hydrogen impurity in CO 2 gas cylinders, hence emphasized the need to ensure the gaseous contents before injecting the media from the cylinders to the system. 2. a. Studies on frequent tube failures of TG auxiliary coolers: The detailed studies and investigation revealed that under deposit corrosion contributed by microbiological attack was the main cause for frequent failures of 90/10 Cupro Nickel cooler tubes which could be minimized either by resorting to periodical mechanical/chemical cleaning of cooler tubes or by regular chemical treatment with a suitable chemical formulation. b. Development of suitable chemical formulation for chemical cleaning of TG auxiliary coolers: A series of in-house experiments at site resulted in developing a suitable chemical formulation for effective cleaning of 90/10 Cupro Nickel cooler tubes. The formulation with 1 % w/w Citric acid with pH adjusted to 8.0 by Ammonia in first step followed by 1 % w/w EDTA with pH adjusted to 9.0 by Hydrazine in the second step could yield more than 90 % cleanliness. 3. Chemical cleaning of cooling circuits of AHUs: An in-house formulation was developed and used for chemical cleaning of cooling circuits (with copper tubes) of AHUs. Post chemical cleaning, the room temperatures decreased by 3-4 degC, hence resulted in better cooling. 4. Enhancement in service period of BBD IX columns: The service period of

  9. Chemistry technician performance evaluation program Palo Verde Nuclear Generating Station

    International Nuclear Information System (INIS)

    Shawver, J.M.

    1992-01-01

    The Arizona Nuclear Power Project (ANPP), a three-reactor site located 50 miles west of Phoenix, Arizona, has developed and implemented a program for evaluating individual chemistry technician analytical performance on a routine basis. About 45 chemistry technicians are employed at the site, 15 at each operating unit. The technicians routinely perform trace level analyses for impurities of concern to PWRs. Each month a set of blind samples is provided by an outside vendor. The blind samples contain 16 parameters which are matrixed to approximate the PWR's primary and secondary cycles. Nine technicians receive the samples, three from each operating unit, and perform the required analyses. Acceptance criteria for successful performance on the blind parameters is based on the values found in the Institute of Nuclear Power Operations (INPO) Document 83-016, Revision 2, August 1989, Chemistry Quality Control Program. The goal of the program is to have each technician demonstrate acceptable performance on each of 16 analytical parameters. On completion of each monthly set, a summary report of all of the analytical results for the sample set is prepared. From the summary report, analytical bias can be detected, technician performance is documented, and overall laboratory performance can be evaluated. The program has been very successful at satisfying the INPO requirement that the analytical performance of each individual technician should be checked on at least a six-month frequency for all important parameters measured. This paper describes the program as implemented at the Palo Verde Nuclear Generating Station and provides a summary report and trend and bias graphs for illustrative purposes

  10. Safety design of next generation SUI of CANDU stations

    Energy Technology Data Exchange (ETDEWEB)

    Nasimi, Elnara [Faculty of Energy Systems and Nuclear Science, University of Ontario Institute of Technology, 2000 Simcoe St. N., Oshawa, L1H 7K4 ON (Canada); Gabbar, Hossam A., E-mail: hossam.gabbar@uoit.ca [Faculty of Energy Systems and Nuclear Science, University of Ontario Institute of Technology, 2000 Simcoe St. N., Oshawa, L1H 7K4 ON (Canada)

    2013-01-15

    Highlights: Black-Right-Pointing-Pointer Review of current SUI technologies and challenges. Black-Right-Pointing-Pointer Propose a new type of SUI detectors. Black-Right-Pointing-Pointer Propose a new SUI system architecture and layout. Black-Right-Pointing-Pointer Propose implementation procedure for SUI with reduced risks. - Abstract: Due to the age and operating experience of Nuclear Power Plants, equipment ageing and obsolescence has become one of the main challenges that need to be resolved for all systems, structures and components in order to ensure a safe and reliable production of energy. This paper summarizes the research into a methodology for modernization of Start-Up Instrumentation (SUI), both in-core and Control Room equipment, using a new generation of detectors and cables in order to manage obsolescence. The main objective of this research is to develop a new systematic approach to SUI installation/replacement procedure development and optimization. Although some additional features, such as real-time data monitoring and storage/archiving solutions for SUI systems are also examined to take full advantage of today's digital technology, the objectives of this study do not include detailed parametrical studies of detector or system performance. Instead, a number of technological, operational and maintenance issues associated with Start-Up Instrumentation systems at Nuclear Power Plants (NPPs) will be identified and a structured approach for developing a replacement/installation procedure that can be standardized and used across all of the domestic CANDU (Canadian Deuterium Uranium) stations is proposed.

  11. 33 CFR 165.554 - Security Zone; Three Mile Island Generating Station, Susquehanna River, Dauphin County...

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Security Zone; Three Mile Island... Areas Fifth Coast Guard District § 165.554 Security Zone; Three Mile Island Generating Station... waters of the Susquehanna River in the vicinity of the Three Mile Island Generating Station bounded by a...

  12. 76 FR 1197 - Arizona Public Service Company, Palo Verde Nuclear Generating Station; Notice of Availability of...

    Science.gov (United States)

    2011-01-07

    ... Service Company, Palo Verde Nuclear Generating Station; Notice of Availability of the Final Supplement 43... of operation for the Palo Verde Nuclear Generating Station (PVNGS). Possible alternatives to the... Arizona Public Service Company; (3) consultation with Federal, State, and local agencies; (4) a review of...

  13. A New Iterative Scheme for the Solution of Tenth Order Boundary ...

    African Journals Online (AJOL)

    Tonistar

    Nigerian Journal of Basic and Applied Science (June, 2016), 24(1): 76-81 ... ABSTRACT. A new iterative scheme for the solution of tenth order boundary value problems has been implemented ... tenth order boundary value problems as compared with the results generated from the Galerkin method available in literature.

  14. Utilization of waste heat from electricity generating stations

    International Nuclear Information System (INIS)

    Robertson, R.F.S.

    1977-06-01

    Historically the nuclear power station has been designed solely as an electricity producer. But in Canada today only 15 percent of our energy consumption is as electricity. The non-electrical needs today are supplied almost entirely by natural gas and oil. There is an incentive to see whether a nuclear station could supply energy for some of these non-electrical needs, thus freeing gas and oil for uses for which they may be more valuable and suitable, especially in transportation. A group located at the Whiteshell Nuclear Research Establishment undertook a series of studies to examine this problem. These studies were done in sufficient depth to provide technological and economic answers, and as a result several reports have been published on various topics. In this report, the findings from these studies are drawn together in an assessment of the potential in Canada for using waste heat. (author)

  15. A healthful options food station can improve satisfaction and generate gross profit in a worksite cafeteria.

    Science.gov (United States)

    Kimathi, Amber N; Gregoire, Mary B; Dowling, Rebecca A; Stone, Marcelle K

    2009-05-01

    The objectives of this study were to determine customer satisfaction with a healthful options food station offered in a worksite cafeteria and document the financial contribution of such a station. The healthful options station featured daily entrées with fewer than 500 calories and less than 30% of calories from fat. Questionnaires from 655 (24.5% response) employees and students provided data on satisfaction with and usage of the station. The majority of the respondents who had purchased from the healthful options station were female (77.3%), white (51.6%), aged 30 to 50 years (52.0%), and had annual incomes of $60,000 to $100,000 (29.3%) or $20,000 to $39,999 (22.2%). Sales and gross profit from the healthful options station were compared to those of the comfort station. Customers were satisfied with attributes of the healthful options station (means >3 on a 5-point scale). Results of paired t tests suggested that customers who had purchased from the healthful options station rated the station significantly (Pfood presentation, food quality, overall quality of the cafeteria, length of line, and food choices available compared to their ratings for the cafeteria in general. The healthful options station generated average daily sales of $458 and gross profit of $306. However, the sales and gross profit were significantly (P<0.05) less than the comparison comfort station.

  16. Radio-location of mobile stations in third generation networks

    Directory of Open Access Journals (Sweden)

    Milan Manojle Šunjevarić

    2013-06-01

    Full Text Available Mobile station localization in mobile networks started with simple methods (e.g. Cell-ID method which required only slight modifications of network infrastructures. Principally, it was about network localization by which a localization service became available to all types of mobile phones. Due to low precision, the initiated development of more sophisticated methods has not been finished yet. Among the advanced location-based methods are those based on the measurement of location parameters in the time domain. In this paper the general consideration of radio location methods in 3G (UMTS radio networks is presented. The use of time based measurement methods was analysed in detail. Due to the limited article length, the use of other locating methods in 3G networks (based on power measurements, on radio direction measurement, and on cells identification – Cell ID and global positioning system - GPS are not described. Introduction Mobile station localization within modern cellular networks increases the level of user security and opens wide opportunities for commercial operators who provide this service. The major obstacle for the implementation of this service, which also prevents its practical usage, is the modification of the existing network infrastructure. In general, depending on the infrastructure used, positioning methods can be divided into two groups: integrated and independent. Integrated methods are primarily created for communication networks. A possibility to locate users represents just an additional service within a radio network. Independent methods are totally detached from the communication network in which the user whose location is being determined is. Radio location methods Determining the location of a mobile radio station is performed by determining the intersection of two or more lines of position. These lines represent the position of the set of points at which the mobile station may be located. These lines can be: (a

  17. Inspiring the Next Generation: The International Space Station Education Accomplishments

    Science.gov (United States)

    Alleyne, Camille W.; Hasbrook, Pete; Knowles, Carolyn; Chicoine, Ruth Ann; Miyagawa, Yayoi; Koyama, Masato; Savage, Nigel; Zell, Martin; Biryukova, Nataliya; Pinchuk, Vladimir; hide

    2014-01-01

    The International Space Station (ISS) has a unique ability to capture the imagination of both students and teachers worldwide. Since 2000, the presence of humans onboard ISS has provided a foundation for numerous educational activities aimed at capturing that interest and motivating study in the sciences, technology, engineering and mathematics (STEM). Over 43 million students around the world have participated in ISS-related educational activities. Projects such as YouTube Space Lab, Sally Ride Earth Knowledge-based Acquired by Middle Schools (EarthKAM), SPHERES (Synchronized Position Hold Engage and Reorient Experimental Satellites) Zero-Robotics, Tomatosphere, and MAI-75 events among others have allowed for global student, teacher and public access to space through student classroom investigations and real-time audio and video contacts with crewmembers. Educational activities are not limited to STEM but encompass all aspects of the human condition. This is well illustrated in the Uchu Renshi project, a chain poem initiated by an astronaut while in space and continued and completed by people on Earth. With ISS operations now extended to 2024, projects like these and their accompanying educational materials are available to more students around the world. From very early on in the program's history, students have been provided with a unique opportunity to get involved and participate in science and engineering projects. Many of these projects support inquiry-based learning that allows students to ask questions, develop hypothesis-derived experiments, obtain supporting evidence and identify solutions or explanations. This approach to learning is well-published as one of the most effective ways to inspire students to pursue careers in scientific and technology fields. Ever since the first space station element was launched, a wide range of student experiments and educational activities have been performed, both individually and collaboratively, by all the

  18. 75 FR 38845 - Exelon Generation Company, LLC; Three Mile Island Nuclear Station, Unit No. 1; Exemption

    Science.gov (United States)

    2010-07-06

    ...; Three Mile Island Nuclear Station, Unit No. 1; Exemption 1.0 Background Exelon Generation Company, LLC... of the Three Mile Island Nuclear Station, Unit 1 (TMI-1). The license provides, among other things... demonstrations, the licensee stated that three qualified operators are available to perform the manual action at...

  19. Socio-economic impacts of nuclear generating stations

    International Nuclear Information System (INIS)

    Weisiger, M.L.; Pijawka, K.D.

    1982-07-01

    This report documents a case study of the socio-economic impacts of the construction and operation of the St. Lucie nuclear power station. It is part of a major post-licensing study of the socio-economic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period, 1980-1981. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study area during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socio-economic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  20. Socio-economic impacts of nuclear generating stations: Arkansas Nuclear One Station case study

    International Nuclear Information System (INIS)

    Pijawka, K.D.

    1982-07-01

    This report documents a case study of the socio-economic impacts of the construction and operation of the Arkansas Nuclear One nuclear power station. It is part of a major post-licensing study of the socio-economic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period 1980 to 1981. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study area during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socio-economic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  1. Three Mile Island Nuclear Station steam generator chemical cleaning

    International Nuclear Information System (INIS)

    Hansen, C.A.

    1992-01-01

    The Three Mile Island-1 steam generators were chemically cleaned in 1991 by the B and W Nuclear Service Co. (BWNS). This secondary side cleaning was accomplished through application of the EPRI/SGOG (Electric Power Research Institute - Steam Generator Owners Group) chemical cleaning iron removal process, followed by sludge lancing. BWNS also performed on-line corrosion monitoring. Corrosion of key steam generator materials was low, and well within established limits. Liquid waste, subsequently processed by BWNS was less than expected. 7 tabs

  2. Annual report of the AECB on the Gentilly 2 nuclear generating station for 1991

    International Nuclear Information System (INIS)

    1992-11-01

    This report from the Atomic Energy Control Board (AECB) is a detailed review of the operation of the Gentilly 2 nuclear generating station in 1991. AECB staff at the station as well as specialists in the Ottawa office have observed the operation of the station throughout the year. The AECB believes Hydro Quebec has operated the station in a safe manner in accordance with its operating licence. Hydro-Quebec should, however, make more of an effort to resolve some issues under discussion with the AECB. In addition, the events reportable to the AECB should diminish in number and importance

  3. Simulation of the energy - environment economic system power generation costs in power-stations

    International Nuclear Information System (INIS)

    Weible, H.

    1978-09-01

    The costs of power generation are an important point in the electricity industry. The present report tries to supply a model representation for these problems. The costs of power generation for base load, average and peak load power stations are examined on the basis of fossil energy sources, nuclear power and water power. The methods of calculation where dynamic investment calculation processes are used, are given in the shape of formulae. From the point of view of long term prediction, power generation cost sensitivity studies are added to the technical, economic and energy-political uncertainties. The sensitivity of models for calculations is examined by deterministic and stochastic processes. In the base load and average region, power generation based on nuclear power and water power is economically more favourable than that from fossilfired power stations. Even including subsidies, this cost advantage is not in doubt. In the peak load region, pumped storage power stations are more economic than fossilfired power stations. (orig.) [de

  4. GHG PSD Permit: Cheyenne Light, Fuel & Power / Black Hills Power, Inc. – Cheyenne Prairie Generating Station

    Science.gov (United States)

    This page contains the final PSD permit for the Cheyenne Light, Fuel & Power / Black Hills Power, Inc. Cheyenne Prairie Generating Station, located in Laramie, Wyoming, and operated by Black Hills Service Company.

  5. Converting Limbo Lands to Energy-Generating Stations: Renewable Energy Technologies on Underused, Formerly Contaminated Sites

    Energy Technology Data Exchange (ETDEWEB)

    Mosey, G.; Heimiller, D.; Dahle, D.; Vimmerstedt, L.; Brady-Sabeff, L.

    2007-10-01

    This report addresses the potential for using 'Limbo Lands' (underused, formerly contaminated sites, landfills, brownfields, abandoned mine lands, etc. ) as sites for renewable energy generating stations.

  6. Reliable, fault tolerant control systems for nuclear generating stations

    International Nuclear Information System (INIS)

    McNeil, T.O.; Olmstead, R.A.; Schafer, S.

    1990-01-01

    Two operational features of CANDU Nuclear Power Stations provide for high plant availability. First, the plant re-fuels on-line, thereby eliminating the need for periodic and lengthy refuelling 'outages'. Second, the all plants are controlled by real-time computer systems. Later plants are also protected using real-time computer systems. In the past twenty years, the control systems now operating in 21 plants have achieved an availability of 99.8%, making significant contributions to high CANDU plant capacity factors. This paper describes some of the features that ensure the high degree of system fault tolerance and hence high plant availability. The emphasis will be placed on the fault tolerant features of the computer systems included in the latest reactor design - the CANDU 3 (450MWe). (author)

  7. US central station nuclear electric generating units: significant milestones

    International Nuclear Information System (INIS)

    1979-09-01

    Listings of US nuclear power plants include significant dates, reactor type, owners, and net generating capacity. Listings are made by state, region, and utility. Tabulations of status, schedules, and orders are also presented

  8. Determination of reliability criteria for standby diesel generators at a nuclear power station

    International Nuclear Information System (INIS)

    Evans, M.G.K.

    1987-01-01

    The requirement for standby diesel generators at nuclear power stations is developed and a probabilistic approach used to define the reliability parameters. The present criteria used when ordering a diesel generator are compared with the testing required by the regulatory body and the most likely requirement following an accident. The impact of this on the diesels at a particular station and the root cause of failures are discussed. (orig.)

  9. Radioactive release data from Canadian nuclear generating stations 1972 to 1988

    International Nuclear Information System (INIS)

    1990-01-01

    All nuclear generating stations emit small quantities of radioactive effluent both into the atmosphere and, in the form of liquid effluent, into the adjoining water body, be it river, lake or sea. The purpose of this document is to report on the magnitude of these emissions for each nuclear generating station in Canada and to indicate how these emissions compare with the relevant limitations imposed by the Atomic Energy Control Board as part of its regulatory and licensing program

  10. Phytotoxicology section investigation in the vicinity of the Bruce Nuclear Power Development, the Pickering Nuclear Generating Station and the Darlington Nuclear Generating Station, in October, 1989

    International Nuclear Information System (INIS)

    1991-02-01

    The Phytotoxicology Section, Air Resources Branch is a participant in the Pickering and Bruce Nuclear Contingency Plans. The Phytotoxicology Emergency Response Team is responsible for collecting vegetation samples in the event of a nuclear emergency at any of the nuclear generating stations in the province. As part of its responsibility the Phytotoxicology Section collects samples around the nuclear generating stations for comparison purposes in the event of an emergency. Because of the limited frequency of sampling, the data from the surveys are not intended to be used as part of a regulatory monitoring program. These data represent an effort by the MOE to begin to establish a data base of tritium concentrations in vegetation. The Phytotoxicology Section has carried out seven surveys in the vicinity of Ontario Hydro nuclear generating stations since 1981. Surveys were conducted for tritium in snow in the vicinity of Bruce Nuclear Power Development (BNPD), February, 1981; tritium in cell-free water of white ash in the vicinity of BNPD, September, 1981; tritium in snow in the vicinity of BNPD, March, 1982; tritium in tree sap in the vicinity of BNPD, April, 1982; tritium in tree sap in the vicinity of BNPD, April, 1984, tritium in the cell-free water of white ash in the vicinity of BNPD, September, 1985; and, tritium in cell-free water of grass in the vicinity of Pickering Nuclear Generation Station (PNGS), October 1986. In all cases a pattern of decreasing tritium levels with increasing distance from the stations was observed. In October, 1989, assessment surveys were conducted around Bruce Nuclear Power Development, the Pickering Nuclear Generating Station and the new Darlington Nuclear Generating Station (DNGS). The purpose of these surveys was to provide baseline data for tritium in cell-free water of grass at all three locations at the same time of year. As none of the reactor units at DNGS had been brought on line at the time of the survey, this data was to be

  11. Foreign Material Exclusion Program at CNE Cernavoda Nuclear Generating Station

    International Nuclear Information System (INIS)

    Urjan, Daniel

    2008-01-01

    In the face of a continuing attention to operations and maintenance costs at nuclear power plants, the future of the industry depends largely upon increasing plant availability and improving operating efficiency. The success in achieving these objectives is dependent upon the success of each plant's equipment maintenance program. Preventing the introduction of foreign materials into a nuclear power plant system or component requires a careful, thoughtful, and professional approach by all site personnel. This paper describes a proactive approach to prevent the introduction of foreign material into systems and components, by providing an overview of technical considerations required to develop, implement, and manage a foreign material exclusion program at CNE Cernavoda Unit 1 and 2 Nuclear Power Station. It is also described an example of Foreign Material Intrusion which happened during the 2003 planned maintenance outage at Cernavoda Unit no.1. This paper also defines personnel responsibilities and key nomenclature and a means for evaluating prospective work tasks and activities against standardized criteria, in order to identify the appropriate level of the required FME controls. (author)

  12. EMTP-based ferroresonance analysis for a refurbished generating station

    Energy Technology Data Exchange (ETDEWEB)

    Said, H.; Dariani, A. [SNC Lavalin Transmission and Distribution, Calgary, AB (Canada)

    2008-07-01

    Ferroresonance is a type of non-linear resonance, characterized by over-voltages. This may cause equipment failure, power quality issues and outages in power systems. In most cases, ferroresonance occurs when at least one poorly damped resonance mode of a non-linear LC circuit is excited. Any change in system configuration that results in addition of a non-linear magnetic element such as power transformers in conjunction with capacitors in a generating substation creates a potential ferroresonant situation, warranting a full evaluation of system vulnerability to ferroresonance. This paper addressed a methodology based on preliminary frequency scanning of a piece-wise linearized model of the non-linear system and full time domain simulation of a system for assessing susceptibility to ferroresonance phenomenon. The paper described a case study that involved a generating substation with six transformer banks. Manitoba Hydro performed a transformer replacement project at the Pointe du Bois generating plant. For this project, four refurbished step-up transformers, were installed in a yard adjacent to the powerhouse. A simplified single line diagram for the transformers and generators was presented. The paper also described the piecewise linear frequency method. Last, the time domain results were described indicating overvoltages due to saturation of one of the transformer banks. It was concluded that the potential for ferroresonance exists when the transformer bank is operated in isolated mode. 4 refs., 10 figs.

  13. Conceptual design of a DOT farm generator station

    NARCIS (Netherlands)

    Michailidis, D.; Diepeveen, N.F.B.

    2011-01-01

    The Delft Offshore Turbine (DOT) is a DUWIND research project that focuses on reducing the cost of offshore wind energy by bringing a radical change in offshore wind turbine technology. The main concept is to centralize electricity generation by having individual wind turbines create a flow of

  14. Efficient lighting in a coal fired generating station

    Energy Technology Data Exchange (ETDEWEB)

    Panchal, B. [Ontario Power Generation, Toronto, ON (Canada)

    2001-02-01

    Upgrading the lighting in one of Ontario Power Generation's (formerly Ontario Hydro) coal-fired generating plants by replacing the open strip Very High Output (VHO) and F40 fixtures with metal halide fixtures (30-40 watt and 10-25 watt fixtures, respectively) is discussed. The wholesale replacement was preceded by a one year long trial in which 81 VHO and 79 F40 were replaced with 40 metal halide fixtures. The subsequent choice of metal halide for the entire plant was based on the results of this pilot project. Results showed a four-fold increase in light levels, a significant reduction in the number and types of lamps and ballasts used, a 60 per cent reduction in energy consumption and a 50 per cent reduction in maintenance costs. 2 photos.

  15. Thermal efficiency improvements - an imperative for nuclear generating stations

    International Nuclear Information System (INIS)

    Hassanien, S.; Rouse, S.

    1997-01-01

    A one and a half percent thermal performance improvement of Ontario Hydro's operating nuclear units (Bruce B, Pickering B, and Darlington) means almost 980 GWh are available to the transmission system (assuming an 80% capacity factor). This is equivalent to the energy consumption of 34,000 electrically-heated homes in Ontario, and worth more than $39 million in revenue to Ontario Hydro Nuclear Generation. Improving nuclear plant thermal efficiency improves profitability (more GWh per unit of fuel) and competitiveness (cost of unit energy), and reduces environmental impact (less spent fuel and nuclear waste). Thermal performance will naturally decrease due to the age of the units unless corrective action is taken. Most Ontario Hydro nuclear units are ten to twenty years old. Some common causes for loss of thermal efficiency are: fouling and tube plugging of steam generators, condensers, and heat exchangers; steam leaks in the condenser due to valve wear, steam trap and drain leaks; deposition, pitting, cracking, corrosion, etc., of turbine blades; inadequate feedwater metering resulting from corrosion and deposition. This paper stresses the importance of improving the nuclear units' thermal efficiency. Ontario Hydro Nuclear has demonstrated energy savings results are achievable and affordable. Between 1994 and 1996, Nuclear reduced its energy use and improved thermal efficiency by over 430,000 MWh. Efficiency improvement is not automatic - strategies are needed to be effective. This paper suggests practical strategies to systematically improve thermal efficiency. (author)

  16. Celebrating the tenth conference session

    International Nuclear Information System (INIS)

    1966-01-01

    Full text: This number of the Bulletin appears during a month when the tenth regular session of the Agency's General Conference is being held. It is fitting that among the special arrangements made to give added significance to such an historical landmark should be an opening address by Herr Franz Jonas, Federal President of the host country, Austria. The Festsaal of the Kongresszentrum, in the Hofburg, has now been the centre for every annual session held in Austria, except the first. On that occasion, recorded in the photograph on the cover, the Konzerthaus was made available. A commemorative series of talks dealing with topics of particular interest in the international development of the peaceful uses of atomic energy, delivered by scientists of world distinction was another idea which will add much profound thought to the records of nuclear energy. Under the chairmanship of Professor L.C. Prado, with Dr. W.B. Lewis as Moderator, the subjects chosen by the participants were : The Impact of Atomic Energy in our Society - Sir John Cockcroft; Nuclear Power Systems and their Technical Potentialities - Prof. Alexandre Leipunski; The Commercial Future of Nuclear Power - Dr. William Webster; Nuclear Science in Life Sciences - Dr. A.R. Gopal-Ayengar; Fundamental Research in Atomic Energy Centres - Prof. Louis Neel. These speeches will be reproduced in full in the Agency's Atomic Energy Review. The pages of this issue of the Bulletin are intended to give indications of the stage which the Agency has now reached in some, but by no means all, of its activities in promoting the techniques of atomic energy for the benefit of mankind. (author)

  17. AECB staff annual assessment of the Darlington Nuclear Generating Station for the year 1996

    International Nuclear Information System (INIS)

    1997-06-01

    The Atomic Energy Control Board is the independent federal agency that controls all nuclear activities in Canada. A major use of nuclear energy in Canada is electricity production. The AECB assesses every station's performance against legal requirements, including the conditions in the operating licence. Each station is inspected and all aspects of the station's operation and management is reviewed. This report is the AECB staff assessment of safety at the Darlington Nuclear Generating Station for 1996. Ontario Hydro operated the station in a safe manner in 1996. All four special safety systems were fully available 100 percent of the time. There were more problems that affected the safety support systems in 1996 than in the previous year

  18. A study of wet deposition of atmospheric tritium releases at the Ontario Power Generation, Pickering Nuclear Generating Station

    International Nuclear Information System (INIS)

    Crooks, G.; DeWilde, J.; Yu, L.

    2001-01-01

    The Ontario Power Generation,Pickering Nuclear Generating Station (PNGS) has been investigating deposition of atmospheric releases of tritium on their site. This study has included numerical dispersion modelling studies conducted over the past three years, as well as an ongoing field monitoring study. The following paper will present results of the field monitoring study and make comparisons to the numerical modelling. The results of this study could be of potential use to nuclear stations in quantifying tritium deposition in near field regions where building wake effects dominate pollutant dispersion

  19. Acquisition of wood fuel at the Joseph C. McNeil Generating Station

    Energy Technology Data Exchange (ETDEWEB)

    Kropelin, W. [Burlington Electric Dept., VT (United States)

    1993-12-31

    The Joseph C. McNeil Generating Station is the world`s largest single boiler, municipally-owned, wood-fired electrical generating plant. The 50 megawatt McNeil Station is located in Burlington, Vermont and is owned by several Vermont public and private electric utilities. The operator and majority owner is the City of Burlington Electric Department (BED). Wood fuel procurement for the McNeil Station has been conducted in an environmentally sensitive way. Harvesting is carried out in conformance with a comprehensive wood chip harvesting policy and monitored by professional foresters. Unpredictable levels of Station operation require rigid adherence to a wood storage plan that minimizes the risk of over heating and spontaneous combustion of stockpiled fuel.

  20. Steam generator management at Ontario Hydro Nuclear Stations

    Energy Technology Data Exchange (ETDEWEB)

    Nickerson, J. [Atomic Energy of Canada Limited, Mississauga, Ontario (Canada); Maruska, C.C. [Ontario Hydro, Toronto, Ontario (Canada)

    1998-07-01

    Managing ageing steam generators involves costly decisions for the utility, both in terms of the cost of the maintenance activities andin terms of having the unit shutdown and consequent power loss while performing these activities. The benefits of these activities are seldom guaranteed and are sometimes very intangible. For nuclear utilities the most pertinent questions that arise are have we identified all the problem(s), can we predict the risk due to these problems? Can we implement corrective and preventive activities to manage the problem and what is the optimum timing of implementation? Is the money spent worthwhile, i.e. has it given us a return in production and safety? Can we avoid surprises? How can we tangibly measure success? This paper touches briefly on all the questions mentioned above but it mainly addresses the last question: 'how can we tangibly measure success?' by using several success indicators proposed by EPRI and by applying them to actual Ontario Hydro experience. The appropriateness of these success indicators as the means to assess the success of these programs, to feed back the results, and to enhance or revise the programs will be discussed. (author)

  1. Steam generator management at Ontario Hydro Nuclear Stations

    International Nuclear Information System (INIS)

    Nickerson, J.; Maruska, C.C.

    1998-01-01

    Managing ageing steam generators involves costly decisions for the utility, both in terms of the cost of the maintenance activities and in terms of having the unit shutdown and consequent power loss while performing these activities. The benefits of these activities are seldom guaranteed and are sometimes very intangible. For nuclear utilities the most pertinent questions that arise are have we identified all the problem(s), can we predict the risk due to these problems? Can we implement corrective and preventive activities to manage the problem and what is the optimum timing of implementation? Is the money spent worthwhile, i.e. has it given us a return in production and safety? Can we avoid surprises? How can we tangibly measure success? This paper touches briefly on all the questions mentioned above but it mainly addresses the last question: 'how can we tangibly measure success?' by using several success indicators proposed by EPRI and by applying them to actual Ontario Hydro experience. The appropriateness of these success indicators as the means to assess the success of these programs, to feed back the results, and to enhance or revise the programs will be discussed. (author)

  2. Latest developments in advanced network management and cross-sharing of next-generation flux stations

    Science.gov (United States)

    Burba, George; Johnson, Dave; Velgersdyk, Michael; Begashaw, Israel; Allyn, Douglas

    2016-04-01

    In recent years, spatial and temporal flux data coverage improved significantly and on multiple scales, from a single station to continental networks, due to standardization, automation, and management of the data collection, and better handling of the extensive amounts of generated data. However, operating budgets for flux research items, such as labor, travel, and hardware, are becoming more difficult to acquire and sustain. With more stations and networks, larger data flows from each station, and smaller operating budgets, modern tools are required to effectively and efficiently handle the entire process, including sharing data among collaborative groups. On one hand, such tools can maximize time dedicated to publications answering research questions, and minimize time and expenses spent on data acquisition, processing, quality control and overall station management. On the other hand, cross-sharing the stations with external collaborators may help leverage available funding, and promote data analyses and publications. A new low-cost, advanced system, FluxSuite, utilizes a combination of hardware, software and web-services to address these specific demands. It automates key stages of flux workflow, minimizes day-to-day site management, and modernizes the handling of data flows: (i) The system can be easily incorporated into a new flux station, or as un upgrade to many presently operating flux stations, via weatherized remotely-accessible microcomputer, SmartFlux 2, with fully digital inputs (ii) Each next-generation station will measure all parameters needed for flux computations in a digital and PTP time-synchronized mode, accepting digital signals from a number of anemometers and data loggers (iii) The field microcomputer will calculate final fully-processed flux rates in real time, including computation-intensive Fourier transforms, spectra, co-spectra, multiple rotations, stationarity, footprint, etc. (iv) Final fluxes, radiation, weather and soil data will

  3. Radioactive emission data from Canadian nuclear generating stations 1972 to 1994

    International Nuclear Information System (INIS)

    1996-07-01

    All nuclear generating stations release small quantities of radioactivity in a controlled manner into both the atmosphere (as gaseous effluents) and adjoining water bodies(as liquid effluents). The purpose of this document is to report on the magnitude of these emissions for each nuclear generating station (NGS) in Canada and to indicate how these emissions compare with the relevant limitations imposed by the AECB as part of its regulatory and licensing program. The data show that the levels of emissions of gaseous and liquid effluents from all currently operating nuclear generating stations are well below the values mandated by the AECB. In fact, since 1987 no emissions have exceeded 1% of those values. 3 tabs., 10 figs

  4. Static analysis of rectifier cabinet for nuclear power generating stations based on finite element method

    Science.gov (United States)

    Yin, Qiang; Chen, Tian-jin; Li, Wei-yang; Xiong, Ze-cheng; Ma, Rui

    2017-09-01

    In order to obtain the deformation map and equivalent stress distribution of rectifier cabinet for nuclear power generating stations, the quality distribution of structure and electrical are described, the tensile bond strengths of the rings are checked, and the finite element model of cabinet is set up by ANSYS. The transport conditions of the hoisting state and fork loading state are analyzed. The deformation map and equivalent stress distribution are obtained. The attentive problems are put forward. It is a reference for analysis method and the obtained results for the transport of rectifier cabinet for nuclear power generating stations.

  5. AECB staff annual assessment of the Bruce A Nuclear Generating Station for the year 1996

    International Nuclear Information System (INIS)

    1997-06-01

    The Atomic Energy Control Board is the independent federal agency that controls all nuclear activities in Canada. A major use of nuclear energy in Canada is electricity production. The AECB assesses every station's performance against legal requirements, including the conditions in the operating licence. Each station is inspected and all aspects of the station's operation and management is reviewed. This report is the AECB staff assessment of reactor safety at the Bruce Nuclear Generating Station A for 1996. Ontario Hydro operated Bruce A safely in 1996, maintaining the risk to workers and the public at an acceptably low level. Special safety system performance at Bruce A was adequate. Availability targets were all met. Improvement is needed to reduce the number of operating licence non-compliances

  6. AECB staff annual assessment of the Point Lepreau Nuclear Generating Station

    International Nuclear Information System (INIS)

    1997-06-01

    The Atomic Energy Control Board is the independent federal agency that controls all nuclear activities in Canada. A major use of nuclear energy in Canada is electricity production. The AECB assesses every station's performance against legal requirements, including the conditions in the operating licence. Each station is inspected and all aspects of the station's operation and management is reviewed. This report is the AECB staff assessment of reactor safety at the Point Lepreau Generating Station in 1996. Point Lepreau operated safely but the worsening trends in NB Power's safety performance leads to the conclusion that urgent action is required. NB Power is required to report formally to the AECB on progress with measures to improve safety management every six months. Further licensing action will be taken on NB Power if it fails to make the improvements

  7. AECB staff annual assessment of the Bruce B Nuclear Generating Station for the year 1996

    International Nuclear Information System (INIS)

    1997-06-01

    The Atomic Energy Control Board is the independent federal agency that controls all nuclear activities in Canada. A major use of nuclear energy in Canada is electricity production. The AECB assesses every station's performance against legal requirements, including the conditions in the operating licence. Each station is inspected and all aspects of the station's operation and management is reviewed. This report is the AECB staff assessment of reactor safety at the Bruce Nuclear Generating Station B for 1996. It was concluded that Ontario Hydro operated Bruce B safely in 1996. Although the Bruce B plant is safe,it was noted that the number of outages and the number of secondary and tertiary equipment failures during reactor unit upsets increased. Ontario Hydro needs to pay special attention to prevent such a decrease in the safety performance at Bruce B

  8. Next Generation Hydrogen Station Composite Data Products: All Stations (Retail and Non-Retail Combined), Data through Quarter 2 of 2017

    Energy Technology Data Exchange (ETDEWEB)

    Sprik, Samuel [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Kurtz, Jennifer M [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Ainscough, Christopher D [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Saur, Genevieve [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Peters, Michael C [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-12-05

    This publication includes 95 composite data products (CDPs) produced for next generation hydrogen stations with data through the second quarter of 2017. These CDPs include data for all stations in NREL's evaluation (retail and non-retail combined).

  9. Next Generation Hydrogen Station Composite Data Products: All Stations (Retail and Non-Retail Combined), Data through Quarter 4 of 2016

    Energy Technology Data Exchange (ETDEWEB)

    Sprik, Sam [National Renewable Energy Lab. (NREL), Golden, CO (United States); Kurtz, Jennifer [National Renewable Energy Lab. (NREL), Golden, CO (United States); Ainscough, Chris [National Renewable Energy Lab. (NREL), Golden, CO (United States); Saur, Genevieve [National Renewable Energy Lab. (NREL), Golden, CO (United States); Peters, Michael [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2017-05-31

    This publication includes 90 composite data products (CDPs) produced for next generation hydrogen stations with data through the fourth quarter of 2016. These CDPs include data for all stations in NREL's evaluation (retail and non-retail combined).

  10. Next Generation Hydrogen Station Composite Data Products: All Stations (Retail and Non-Retail Combined), Data through Quarter 3 of 2016

    Energy Technology Data Exchange (ETDEWEB)

    Sprik, Sam [National Renewable Energy Lab. (NREL), Golden, CO (United States); Kurtz, Jennifer [National Renewable Energy Lab. (NREL), Golden, CO (United States); Ainscough, Chris [National Renewable Energy Lab. (NREL), Golden, CO (United States); Saur, Genevieve [National Renewable Energy Lab. (NREL), Golden, CO (United States); Peters, Michael [National Renewable Energy Lab. (NREL), Golden, CO (United States); Jeffers, Matthew [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2017-03-06

    This publication includes 87 composite data products (CDPs) produced for next generation hydrogen stations with data through the third quarter of 2016. These CDPs include data for all stations in NREL's evaluation (retail and non-retail combined).

  11. Electricity Generation Through the Koeberg Nuclear Power Station of Eskom in South Africa

    International Nuclear Information System (INIS)

    Dladla, G.; Joubert, J.

    2015-01-01

    The poster provides information on the process of nuclear energy generation in a nuclear power plant in order to produce electricity. Nuclear energy currently provides approximately 11% of the world’s electricity needs, with Koeberg Nuclear Power Station situated in the Western Cape providing 4.4% of South Africa’s electricity needs. As Africa’s first nuclear power station, Koeberg has an installed capacity of 1910 MW of power. Koeberg’ s total net output is 1860 MW. While there are significant differences, there are many similarities between nuclear power plants and other electrical generating facilities. Uranium is used for fuel in nuclear power plants to make electricity. With the exception of solar, wind, and hydroelectric plants, all others including nuclear plants convert water to steam that spins the propeller-like blades of a turbine that spins the shaft of a generator. Inside the generator coils of wire and magnetic fields interact to create electricity. The energy needed to boil water into steam is produced in one of two ways: by burning coal, oil, or gas (fossil fuels) in a furnace or by splitting certain atoms of uranium in a nuclear energy plant. The uranium fuel generates heat through a controlled fission process fission, which is described in this poster presentation. The Koeberg Nuclear Power Station is a Pressurised water reactor (PWR). The operating method and the components of the Koeberg Power Station are also described. The nuclear waste generated at a nuclear power station is described under three headings— low-level waste, intermediate-level waste and used or spent fuel, which can be solid, liquid or gaseous. (author)

  12. 75 FR 52045 - Arizona Public Service Company, Palo Verde Nuclear Generating Station, Unit 3; Environmental...

    Science.gov (United States)

    2010-08-24

    ... NUCLEAR REGULATORY COMMISSION [NRC-2010-0281; Docket No. STN 50-530] Arizona Public Service Company, Palo Verde Nuclear Generating Station, Unit 3; Environmental Assessment and Finding of No.... NPF-74, issued to Arizona Public Service Company (APS, the licensee), for operation of Palo Verde...

  13. Radioactive release data from Canadian nuclear generating stations 1872-1987

    International Nuclear Information System (INIS)

    1989-03-01

    All nuclear generating stations emit small quantities of radioactive effluent both into the atmosphere and in the form of liquid effluent, into the adjoining water body, be it river, lake or sea. The purpose of this document is to report on the magnitude of these emissions for each nuclear generating station in Canada and to indicate how these emissions compare with the relevant limitations imposed by the Atomic Energy Control Board as part of its regulatory and licensing program. This report incorporates histograms indicating the annual releases of tritium in air, noble gases, iodine-131, airborne particulates, tritium in water and waterborne gross beta activity for each nuclear generating station. In addition, for Pickering NGS 'A', annual released of carbon-14 are depicted for the years 1986 and 1987. In each case the emission data are compared to the Derived Emission Limit (DEL) in order that the data may be placed in perspective. At present, only Pickering NGS 'A' is required to monitor and report carbon-14 emissions. Environmental monitoring for C-14 is conducted around the Bruce site to determine the environmental impact of its emission and whether effluent monitoring will be necessary in future years. Three nuclear generating stations have been permanently taken out of service during the last few years (Gentilly NGS-1, Douglas Point NGS and NPD NGS). Some small emissions from these sites do still occur, however, due to decontamination and decommissioning operations. (11 tabs., 26 figs.)

  14. The competitive economics of a middle aged multi unit nuclear generating station

    International Nuclear Information System (INIS)

    Talbot, K.H.

    1994-01-01

    In 1992 Ontario Hydro's 15 year old 4 x 850 MWe Candu, Bruce A Nuclear Generating Station was predicted to need considerable capital investment to replace pressure tubes, steam generators and other prematurely ageing equipment in order to restore the station to high performance. Over the subsequent two years the station has undergone 2 major economic assessment studies which have confirmed the economic viability of continued operation of the plant. Declining demand for electricity in Ontario combined with a excess of generating capacity and a need to stabilise electricity rates have however forced significant operational cost reductions and reduced capital availability for rehabilitation work, it's medium and long term future remains in question. This presentation offers a practical illustration of the need to maintain steady high performance from nuclear generating plant via the appropriate life management techniques. The avoidance of mid life infusion of capital is considered as essential if nuclear generation is to successfully survive major changes in economic conditions. 2 tabs., 7 figs

  15. On the possibility of generation of cold and additional electric energy at thermal power stations

    Science.gov (United States)

    Klimenko, A. V.; Agababov, V. S.; Borisova, P. N.

    2017-06-01

    A layout of a cogeneration plant for centralized supply of the users with electricity and cold (ECCG plant) is presented. The basic components of the plant are an expander-generator unit (EGU) and a vapor-compression thermotransformer (VCTT). At the natural-gas-pressure-reducing stations, viz., gas-distribution stations and gas-control units, the plant is connected in parallel to a throttler and replaces the latter completely or partially. The plant operates using only the energy of the natural gas flow without burning the gas; therefore, it can be classified as a fuelless installation. The authors compare the thermodynamic efficiencies of a centralized cold supply system based on the proposed plant integrated into the thermal power station scheme and a decentralized cold supply system in which the cold is generated by electrically driven vapor-compression thermotransformers installed on the user's premises. To perform comparative analysis, the exergy efficiency was taken as the criterion since in one of the systems under investigation the electricity and the cold are generated, which are energies of different kinds. It is shown that the thermodynamic efficiency of the power supply using the proposed plant proves to be higher within the entire range of the parameters under consideration. The article presents the results of investigating the impact of the gas heating temperature upstream from the expander on the electric power of the plant, its total cooling capacity, and the cooling capacities of the heat exchangers installed downstream from the EGU and the evaporator of the VCTT. The results of calculations are discussed that show that the cold generated at the gas-control unit of a powerful thermal power station can be used for the centralized supply of the cold to the ventilation and conditioning systems of both the buildings of the power station and the neighboring dwelling houses, schools, and public facilities during the summer season.

  16. Design and installation of a strategically placed algae mesh barrier at OPG Pickering Nuclear Generating Station

    International Nuclear Information System (INIS)

    Marttila, D.; Patrick, P.; Gregoris, C.

    2009-01-01

    Ontario Power Generation's Pickering Nuclear has experienced a number of events in which attached algae have become entrained in the water intake costing approximately $30M over the 1995-2005 period as a result of deratings, Unit shutdowns and other operational issues. In 2005-2006 OPG and Kinectrics worked collaboratively on evaluating different potential solutions to reduce the impact of algae on the station. One of the solutions developed by Kinectrics included a strategically placed barrier net designed to regulate algae flow into the station intake. In 2006, Kinectrics designed and installed the system, the first of its kind at a Nuclear Power Plant in Canada. The system was operational by May 2007. OPG completed an effectiveness study in 2007 and concluded the barrier system had a beneficial effect on reducing algae impact on the station. (author)

  17. 75 FR 9623 - Arizona Public Service Company, et al.; Palo Verde Nuclear Generating Station, Units 1, 2, and 3...

    Science.gov (United States)

    2010-03-03

    ...] Arizona Public Service Company, et al.; Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Exemption 1.0 Background The Arizona Public Service Company (APS, the facility licensee) is the holder of... Nuclear Generating Station (PVNGS, the facility), Units 1, 2, and 3, respectively. The licenses provide...

  18. 76 FR 24064 - Arizona Public Service Company, Palo Verde Nuclear Generating Station, Units 1, 2, and 3, Notice...

    Science.gov (United States)

    2011-04-29

    ... Service Company, Palo Verde Nuclear Generating Station, Units 1, 2, and 3, Notice of Issuance of Renewed... issued Renewed Facility Operating License Nos. NPF-41, NPF-51, and NPF-74 to Arizona Public Service Company (licensee), the operator of the Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (PVNGS...

  19. 75 FR 15745 - Arizona Public Service Company, et al. Palo Verde Nuclear Generating Station, Units 1, 2, and 3...

    Science.gov (United States)

    2010-03-30

    ...] Arizona Public Service Company, et al. Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Exemption 1.0 Background The Arizona Public Service Company (APS, the licensee) is the holder of Facility... Generating Station (PVNGS), Units 1, 2, and 3, respectively. The licenses provide, among other things, that...

  20. 75 FR 8149 - Arizona Public Service Company, et al. Palo Verde Nuclear Generating Station, Units 1, 2, and 3...

    Science.gov (United States)

    2010-02-23

    ...] Arizona Public Service Company, et al. Palo Verde Nuclear Generating Station, Units 1, 2, and 3... NPF-74, issued to the Arizona Public Service Company (APS, or the licensee), for operation of the Palo Verde Nuclear Generating Station (PVNGS, the facility), Units 1, 2, and 3, respectively, located in...

  1. 75 FR 13606 - Arizona Public Service Company, Palo Verde Nuclear Generating Station, Units 1, 2, and 3...

    Science.gov (United States)

    2010-03-22

    ...] Arizona Public Service Company, Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Environmental...-74, issued to Arizona Public Service Company (APS, the licensee), for operation of the Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (PVNGS, Units 1, 2, and 3), located in Maricopa County...

  2. Generating power stations and optimization energetic of processes; Centrales generadoras y optimacion energetica de procesos

    Energy Technology Data Exchange (ETDEWEB)

    Gutierrez Ramirez, Ranulfo; Fernandez Montiel, Manuel Francisco [Instituto de Investigaciones Electricas, Temixco, Morelos (Mexico)

    1999-07-01

    Some recent experiences of the Management of Thermal Processes of the Instituto de Investigaciones Electricas (IIE) related to the works on generating power stations of electricity, plants of cogeneration and energy saving are presented. [Spanish] Se presentan algunas experiencias recientes de la Gerencia de Procesos Termicos del Instituto de Investigaciones Electricas (IIE) relacionadas con los trabajos sobre centrales generadoras de electricidad, plantas de cogeneracion y ahorro de energia.

  3. Aerial radiological survey of the San Onofre Nuclear Generating Station and surrounding area, San Clemente, California

    International Nuclear Information System (INIS)

    Hilton, L.K.

    1980-12-01

    An airborne radiological survey of an 11 km 2 area surrounding the San Onofre Nuclear Generating Station was made 9 to 17 January 1980. Count rates observed at 60 m altitude were converted to exposure rates at 1 m above the ground and are presented in the form of an isopleth map. Detected radioisotopes and their associated gamma ray exposure rates were consistent with that expected from normal background emitters, except directly over the plant

  4. AECB staff annual assessment of the Point Lepreau Nuclear Generating Station for the year 1995

    International Nuclear Information System (INIS)

    1996-06-01

    The Atomic Energy Control Board conducts a staff assessment of safety at Point Lepreau Generating Station for 1995. On-site Project Officers and Ottawa based specialists monitored the station throughout the year. Point Lepreau operated safely during 1995 which was an unusual year for the station. The station was shut down for a planned five month outage to allow NB Power to complete maintenance on the reactor's pressure tubes. NB Power failed to comply with the terms of the Operating Licence we issue on fourteen occasions in 1995. In addition, NB Power reported an unusually large number of events. None of the events themselves directly affected public safety, if this level of performance continues unchecked, it might result in increased risk from operation in the future. Human error was an important feature of these problems. NB Power had already introduced safety culture training for their staff, but they will need to undertake further work urgently to resolve the problems. Three of Point Lepreau's special safety systems failed to meet their availability targets during 1995. NB Power's safety analysis program progress slowed during 1995, due to the additional workload from the outage. The Point Lepreau's training, quality assurance and safeguards related activities continued to function satisfactorily. They have assigned additional resources to emergency preparedness planning, which should enable them to take a more pro-active approach in this area. 7 tabs., 5 figs

  5. AECB staff annual assessment of the Point Lepreau Nuclear Generating Station for the year 1994

    International Nuclear Information System (INIS)

    1995-06-01

    This report is the Atomic Energy Control Board assessment of safety at Point Lepreau Generating Station for 1994. AECB on-site Project Officers, and Ottawa based specialists monitored the station throughout the year. The station operated safely during 1994. Performance of the special safety systems was very good, and NB Power made important progress improving the safety management of these systems. NB Power staff failed to comply with the conditions of our Operating Licence seven times during 1994. This is an improvement from last year, but the number of compliance problems is still too high. NB Power introduced safety culture training for its staff last year. AECB is optimistic that this will help to improve compliance. The station fully met the radiation safety requirements during the year. Releases of radioactive material to the environment are well below the limits set. Radiation exposure to workers are being well controlled, and AECB believe that NB Power is maintaining these exposures 'As Low As Reasonably Achievable' for this reactor type

  6. North Anna Power Station - Unit 1: Overview of steam generator replacement project activities

    International Nuclear Information System (INIS)

    Gettler, M.W.; Bayer, R.K.; Lippard, D.W.

    1993-01-01

    The original steam generators at Virginia Electric and Power Company's (Virginia Power) North Anna Power Station (NAPS) Unit 1 have experienced corrosion-related degradation that require periodic inspection and plugging of steam generator tubes to ensure their continued safe and reliable operation. Despite improvements in secondary water chemistry, continued tube degradation in the steam generators necessitated the removal from service of approximately 20.3 percent of the tubes by plugging, (18.6, 17.3, and 25.1 for steam generators A, B, and C, respectively). Additionally, the unit power was limited to 95 % during, its last cycle of operation. Projections of industry and Virginia Power experience indicated the possibility of mid-cycle inspections and reductions in unit power. Therefore, economic considerations led to the decision to repair the steam generators (i.e., replace the steam generator lower assemblies). Three new Model 51F Steam Generator lower assembly units were ordered from Westinghouse. Virginia Power contracted Bechtel Power Corporation to provide the engineering and construction support to repair the Unit 1 steam generators. On January 4, 1993, after an extended coastdown period, North Anna Unit 1 was brought off-line and the 110 day (breaker-to-breaker) Steam Generator Replacement Project (SGRP) outage began. As of this paper, the outage is still in progress

  7. Models for the transient stability of conventional power generating stations connected to low inertia systems

    Science.gov (United States)

    Zarifakis, Marios; Coffey, William T.; Kalmykov, Yuri P.; Titov, Sergei V.

    2017-06-01

    An ever-increasing requirement to integrate greater amounts of electrical energy from renewable sources especially from wind turbines and solar photo-voltaic installations exists and recent experience in the island of Ireland demonstrates that this requirement influences the behaviour of conventional generating stations. One observation is the change in the electrical power output of synchronous generators following a transient disturbance especially their oscillatory behaviour accompanied by similar oscillatory behaviour of the grid frequency, both becoming more pronounced with reducing grid inertia. This behaviour cannot be reproduced with existing mathematical models indicating that an understanding of the behaviour of synchronous generators, subjected to various disturbances especially in a system with low inertia requires a new modelling technique. Thus two models of a generating station based on a double pendulum described by a system of coupled nonlinear differential equations and suitable for analysis of its stability corresponding to infinite or finite grid inertia are presented. Formal analytic solutions of the equations of motion are given and compared with numerical solutions. In particular the new finite grid model will allow one to identify limitations to the operational range of the synchronous generators used in conventional power generation and also to identify limits, such as the allowable Rate of Change of Frequency which is currently set to ± 0.5 Hz/s and is a major factor in describing the volatility of a grid as well as identifying requirements to the total inertia necessary, which is currently provided by conventional power generators only, thus allowing one to maximise the usage of grid connected non-synchronous generators, e.g., wind turbines and solar photo-voltaic installations.

  8. DEVELOPING LISTENING MATERIALS FOR THE TENTH GRADERS

    Directory of Open Access Journals (Sweden)

    Muhammad Lukman Syafi’i

    2016-11-01

    Full Text Available The needs survey shows that English listening skill of the students in the tenth graders of Indonesian Islamic High School or Madrasah Aliyah is not well developed. Consequently, the listening instructional materials based on standard of content 2006 used in the classes need to be advanced. The researcher used only one try out of the product, second revision in this study was the seventh step of Borg and Gall model operational product revision. This was done based on the result of the try out, and the final product (the production of the new materials. The development used in this study consists of needs survey, developing the materials, experts and teacher‟s validation, revision, try out, second revision and the final product. The product is found acceptable for the tenth grade students.

  9. A Potential Transmitter Architecture for Future Generation Green Wireless Base Station

    Directory of Open Access Journals (Sweden)

    Mike Faulkner

    2009-01-01

    Full Text Available Current radio frequency power amplifiers in 3G base stations have very high power consumption leading to a hefty cost and negative environmental impact. In this paper, we propose a potential architecture design for future wireless base station. Issues associated with components of the architecture are investigated. The all-digital transmitter architecture uses a combination of envelope elimination and restoration (EER and pulse width modulation (PWM/pulse position modulation (PPM modulation. The performance of this architecture is predicted from the measured output power and efficiency curves of a GaN amplifier. 57% efficiency is obtained for an OFDM signal limited to 8 dB peak to average power ratio. The PWM/PPM drive signal is generated using the improved Cartesian sigma delta techniques. It is shown that an RF oversampling by a factor of four meets the WLAN spectral mask, and WCDMA specification is met by an RF oversampling of sixteen.

  10. Pre-license team training at San Onofre Nuclear Generating Station

    International Nuclear Information System (INIS)

    Freers, S.M.; Hyman, M.

    1987-01-01

    Team Training at San Onofre Nuclear Generating Station (SONGS) Units 2 and 3 has been developed to enhance the performance of station operations personnel. The FACT Training Program (Formality, Attention to Detail, Consistency and Team Effort) is the common denominator for operations team training. Compliance with good operating practices is enhanced by operators working as a team toward the same goal, using the same language, practicing the same operating and communication skills, possessing a clear understanding of individual roles and responsibilities of team members and practicing attention to detail in every task. These elements of effective teamwork are emphasized by the processes and criteria used in the Pre-License Operator Training Program at SONGS

  11. Processing of sump sludges at the Commonwealth Edison Byron Nuclear Generating Station

    International Nuclear Information System (INIS)

    Herrmann, D.; Gardner, D.A.; Taylor, E.R. Jr.

    1990-01-01

    A basic criterion for the disposal of radioactive waste by shallow land burial is that the material must not contain free liquids. In addition burial sites' requirements regarding radioactive waste containing oils, even though solidified, are restrictive. At Commonwealth Edison Byron Nuclear Generating Station a methodology for processing treated waste sludges, originating form the turbine building's floor drains was developed and implemented. As a result of this effort, 322 drums of oil and water sludge were processed. A dry cake, i.e., no free liquids, was produced, packaged, and readied for disposal. The dry cake contained less than 2% oil. The liquid phases resulting from the processing of the treated waste sludge were oil (that was to be processed for disposal as non-radioactive) and filtrate containing less than 5 ppm total suspended solids (TSS) and oil/grease. The filtrate TSS was below the Station's National Pollution Discharge Elimination System (NPDES) permit release limits. 4 figs

  12. A Potential Transmitter Architecture for Future Generation Green Wireless Base Station

    Directory of Open Access Journals (Sweden)

    Cijvat Ellie

    2009-01-01

    Full Text Available Abstract Current radio frequency power amplifiers in 3G base stations have very high power consumption leading to a hefty cost and negative environmental impact. In this paper, we propose a potential architecture design for future wireless base station. Issues associated with components of the architecture are investigated. The all-digital transmitter architecture uses a combination of envelope elimination and restoration (EER and pulse width modulation (PWM/pulse position modulation (PPM modulation. The performance of this architecture is predicted from the measured output power and efficiency curves of a GaN amplifier. 57% efficiency is obtained for an OFDM signal limited to 8 dB peak to average power ratio. The PWM/PPM drive signal is generated using the improved Cartesian sigma delta techniques. It is shown that an RF oversampling by a factor of four meets the WLAN spectral mask, and WCDMA specification is met by an RF oversampling of sixteen.

  13. Design and development of steam generators for the AGR power stations at Heysham II/Torness

    International Nuclear Information System (INIS)

    Charcharos, A.N.; Jones, A.G.

    1984-01-01

    The current AGR steam generator design is a development of the successful once-through units supplied for the Oldbury Magnox and Hinkley/Hunterston AGR power stations. These units have demonstrated proven control and reliability in service. In this paper the factors which have dictated the design and layout of the latest AGR steam generators are described and reference made to the latest high temperature design techniques that have been employed. Details of development work to support the design and establish the performance characteristics over the range of plant operating conditions are also given. To comply with current UK safety standards, the AGR steam generators and associated plant are designed to accommodate seismic loadings. In addition, provision is made for an independent heat removal system for post reactor trip operations. (author)

  14. Using the International Space Station (ISS) Oxygen Generation Assembly (OGA) Is Not Feasible for Mars Transit

    Science.gov (United States)

    Jones, Harry W.

    2016-01-01

    A review of two papers on improving the International Space Station (ISS) Oxygen Generation Assembly (OGA) shows that it would not save substantial mass on a Mars transit. The ISS OGA requires redesign for satisfactory operation, even for the ISS. The planned improvements of the OGA for ISS would not be sufficient to make it suitable for Mars, because Mars transit life support has significantly different requirements than ISS. The OGA for Mars should have lower mass, better reliability and maintainability, greater safety, radiation hardening, and capability for quiescent operation. NASA's methodical, disciplined systems engineering process should be used to develop the appropriate system.

  15. Radioactivity in coal, ashes and selected wastewaters from Canadian coal-fired steam electric generating stations

    International Nuclear Information System (INIS)

    1985-09-01

    Coal is known to contain naturally occurring radioactive elements and there has been speculation that as a results, coal-fuelled power generation stations may be significant emitters of these substances. In this report, the subject of radioactivity is introduced. The kinds of radioactive substances which occur naturally in coal formations, the nature of their emissions and the existing information on their behaviour and their effects on environmental organisms are also reviewed. The results of an examination of levels of alpha, beta and gamma radiaton levels, and the substances which produce them in coals, fly ashes, bottom ashes and related wastewaters at six Canadian coal-fuelled power stations are presented. Difficulties in studies of this nature and the potential effects of these releases on organisms in the adjacent aquatic environment are discussed. Existing and potential technologies for the removal of these substances from wastewaters are examined. In general the releases in wastewaters from the six stations were found to be lower than those known to cause short-term or acute biological effects. The potential for long-term effects from such low-level releases could not be accurately assessed because of the paucity of information. A number of recommendations for: improvements in further studies of this nature; the further examination of the fate of naturally occurring radionuclides in the environment; and the determination of the long-term effects of low levels of naturally occurring radioactive substances on aquatic organisms, are made

  16. Cost comparison of 4x500 MW coal-fuelled and 4x850 MW CANDU nuclear generating stations

    International Nuclear Information System (INIS)

    Costa, M.

    1981-01-01

    The lifetime costs for a 4x850 MW CANDU generating station are compared to those for 4x500 MW bituminous coal-fuelled generating stations. Two types of coal-fuelled stations are considered; one burning U.S. coal which includes flue gas desulfurization and one burning Western Canadian coal. Current estimates for the capital costs, operation and maintenance costs, fuel costs, decommissioning costs and irradiated fuel management costs are shown. The results show: (1) The accumulated discounted costs of nuclear generation, although initially higher, are lower than coal-fuelled generation after two or three years. (2) Fuel costs provide the major contribution to the total lifetime costs for coal-fuelled stations whereas capital costs are the major item for the nuclear station. (3) The break even lifetime capacity factor between nuclear and U.S. coal-fuelled generation is projected to be 5%; that for nuclear and Canadian coal-fuelled generation is projected to be 9%. (4) Large variations in the costs are required before the cost advantage of nuclear generation is lost. (5) Comparison with previous results shows that the nuclear alternative has a greater cost advantage in the current assessment. (6) The total unit energy cost remains approximately constant throughout the station life for nuclear generation while that for coal-fuelled generation increases significantly due to escalating fuel costs. The 1978 and 1979 actual total unit energy cost to the consumer for several Ontario Hydro stations are detailed, and projected total unit energy costs for several Ontario Hydro stations are shown in terms of escalated dollars and in 1980 constant dollars

  17. AECB staff annual assessment of the Pickering A and B Nuclear Generating Stations for the year 1994

    International Nuclear Information System (INIS)

    1995-06-01

    The Pickering Nuclear Generating Station (PNGS) is located on the north shore of Lake Ontario, about 32 km east of downtown Toronto. It consists of two stations, PNGS-A and PNGS-B. Each station contains four reactor units. PNGS-A consists of Units 1 to 4, while PNGS-B consists of Units 5 to 8. Each unit can generate about 540 megawatts of electricity. All eight units are located within a single enclosure. Ontario Hydro's Pickering Nuclear Division has assigned one Station Director with authority over both stations, but each station has its own organization. AECB issue a separate operating licence for each station. This report presents the Atomic Energy Control Board staff assessment of the Pickering stations' safety performance in 1994 and other aspects that they consider to have significant impact on nuclear safety. AECB based their conclusions on their observations, audits, inspections and review of information that Ontario Hydro submits to them as required by the station Operating Licences. 11 tabs., 8 figs

  18. Monitoring the risk of loss of heat sink during plant shutdowns at Bruce Generating Station 'A'

    International Nuclear Information System (INIS)

    Krishnan, K.S.; Mancuso, F.; Vecchiarelli, D.

    1996-01-01

    A relatively simple loss of shutdown heat sink fault tree model has been developed and used during unit outages at Bruce Nuclear Generation Station 'A' to assess, from a risk and reliability perspective, alternative heat sink strategies and to aid in decisions on allowable outage configurations. The model is adjusted to reflect the various unit configurations planned during a specific outage, and identifies events and event combinations leading to loss of fuel cooling. The calculated failure frequencies are compared to the limits consistent with corporate and international public safety goals. The importance measures generated by the interrogation of the fault tree model for each outage configuration are also used to reschedule configurations with high fuel damage frequency later into the outage and to control the configurations with relatively high probability of fuel damage to short intervals at the most appropriate time into the outage. (author)

  19. IEEE recommended practices for seismic qualification of Class 1E equipment for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1975-01-01

    The IEEE has developed this document to provide direction for developing programs to seismically qualify Class 1E equipment for nuclear power generating stations. It supplements IEEE Std 323-1974, IEEE Standard for Qualifying Class 1E Equipment for Nuclear Power Generating Stations, which describes the basic requirements for equipment qualification. The Class 1E equipment to be qualified by produres or standards established by this document are of many forms, characteristics, and materials; therefore, the document presents many acceptable methods with the intent of permitting the user to make a judicious selection from among the various options. In making such a selection, the user should choose those that best meet a particular equipment's requirements. Further, in using this document as a specification for the purchase of equipment, the many options should also be recognized and the document invoked accordingly. It is recommended that the need for specific standards for the seismic qualifiction of particular kinds of equipment be evaluated by those responsible for such documents and that consideration be given to the application of particular methods from these documents which are most suitable

  20. A collaborative effort to apply ergonomics to electric utility workers at generating stations.

    Science.gov (United States)

    Stone, Amy; Marklin, Richard; Seeley, Patricia; Mezei, Gabor

    2011-01-01

    As part of a collaborative approach involving electric utility companies, university researchers, individual contractors and a not-for-profit research institute, two ergonomics teams consisting of skilled utility workers and trained ergonomists, were assembled. These teams were to identify tasks with risk factors for musculoskeletal disorders (MSDs) among workers in fossil-fueled generating stations and and to propose ergonomic interventions for these tasks. One team focused on tasks of electricians and the other focused on tasks of plant operators and mechanics. Several of the tasks were tested in an ergonomics laboratory and at one of the utility's generating stations. We present a sample of the recommended interventions in this paper. An anthropometric analysis of electrical box height recommended the appropriate height for electrical boxes. The results of a field experiment showed that low rolling resistance wheels decreased the forces to initiate and sustain pushing a cart. The same experiment also demonstrated that the forces required to turn a cart with six wheels were lower than the forces equired to turn a cart with four wheels. A collaborative approach to ergonomics proved to be an effective method to identify and assess tasks that are problematic for workers and to develop best practices for these tasks in the electric power industry. This method could be used by other industries in their attempt to decrease the incidence, cost and severity of workplace MSDs. © 2011 - IOS Press and the authors. All rights reserved

  1. Development of an HTS hydroelectric power generator for the hirschaid power station

    Energy Technology Data Exchange (ETDEWEB)

    Fair, Ruben; Lewis, Clive; Eugene, Joseph; Ingles, Martin, E-mail: ruben.fair@converteam.co [Advanced Technology Group, Converteam, Rugby, CV21 1BD (United Kingdom)

    2010-06-01

    This paper describes the development and manufacture of a 1.7MW, 5.25kV, 28pole, 214rpm hydroelectric power generator consisting of superconducting HTS field coils and a conventional stator. The generator is to be installed at a hydro power station in Hirschaid, Germany and is intended to be a technology demonstrator for the practical application of superconducting technology for sustainable and renewable power generation. The generator is intended to replace and uprate an existing conventional generator and will be connected directly to the German grid. The HTS field winding uses Bi-2223 tape conductor cooled to about 30K using high pressure helium gas which is transferred from static cryocoolers to the rotor via a bespoke rotating coupling. The coils are insulated with multi-layer insulation and positioned over laminated iron rotor poles which are at room temperature. The rotor is enclosed within a vacuum chamber and the complete assembly rotates at 214rpm. The challenges have been significant but have allowed Converteam to develop key technology building blocks which can be applied to future HTS related projects. The design challenges, electromagnetic, mechanical and thermal tests and results are presented and discussed together with applied solutions.

  2. The Hilbert's-Tenth-Problem Operator

    OpenAIRE

    Kramer, Ken; Miller, Russell

    2017-01-01

    For a ring $R$, Hilbert's Tenth Problem $HTP(R)$ is the set of polynomial equations over $R$, in several variables, with solutions in $R$. We view $HTP$ as an operator, mapping each set $W$ of prime numbers to $HTP(\\mathbb Z[W^{-1}])$, which is naturally viewed as a set of polynomials in $\\mathbb Z[X_1,X_2,\\ldots]$. For $W=\\emptyset$, it is a famous result of Matiyasevich, Davis, Putnam, and Robinson that the jump $\\emptyset~\\!'$ is Turing-equivalent to $HTP(\\mathbb Z)$. More generally, $HTP(...

  3. Purification and solidification of reactor wastes at a Canadian nuclear generating station

    International Nuclear Information System (INIS)

    Buckley, L.P.; Burt, D.A.

    1981-06-01

    Chalk River Nuclear Laboratories are developing methods to condition power reactor wastes and to immobilize their radionuclides. Evaporation alone and combined with bituminization has been an important part of the program. After testing at the laboratories a 0.5 m 2 wiped-film evaporator was sent to the Douglas Point Nuclear Generating Station (220 MWe) to demonstrate its suitability to handle typical reactor liquid wastes. Two specific tasks undertaken with the wiped-film evaporator were successfully completed. The first was purification of contaminated heavy water which had leaked from the moderator circuit. The heavy water is normally recovered, cleaned by filters and ion-exchange resin and then upgraded by electrolysis. Cleaning the heavy water with the wiped-film evaporator produced better quality water for upgrading than had been achieved by any previous method and at much lower operating cost. The second task was to concentrate and immobilize a decontamination waste. The waste was generated from the decontamination of pump bowls used in the primary heat transport circuit. The simultaneous addition of the liquid waste and bitumen emulsion to the wiped-film evaporator produced a solid containing 30 wt% waste solids in a bitumen matrix. The volume reduction achieved was 16:1 based on the volumes of initial liquid waste and the final product generated. The quantity sent to storage was 20 times less than had the waste been immobilized in a cement matrix. The successful demonstration has resulted in a proposal to install a wiped-film evaporator at the station to clean heavy water and immobilize decontamination wastes. (author)

  4. Review insights on the probabilistic risk assessment for the Limerick Generating Station

    International Nuclear Information System (INIS)

    1984-08-01

    In recognition of the high population density around the Limerick Generating Station site and the proposed power level, the Philadelphia Electric Company, in response to NRC staff requests, conducted and submitted between March 1981 and November 1983 a probabilistic risk assessment (PRA) on internal event contributors and a severe accident risk assessment on external event contributors to assess risks posed by operation of the plant. The applicant has developed perspectives using PRA models on the safety profile of the Limerick plant and has altered the plant design to reduce accident vulnerabilities identified in these PRAs. The staff's review of the Limerick PRA has particularly emphasized the dominant accident sequences and the resulting insights into demonstration of compliance with regulatory requirments, unique design features and major plant vulnerabilities to assess the need for any additional measures to further improve the safety of the LGS. The staff's review insights and PRA safety review conclusions are presented in this report

  5. Experience with reactor power cutback system at Palo Verde nuclear generating station

    International Nuclear Information System (INIS)

    Chari, D.R.; Rec, J.R.; Simoni, L.P.; Eimar, R.L.; Sowers, G.W.

    1987-01-01

    Palo Verde Nuclear Generating Station (PVNGS) is a three unit site which illustrates System 80 nuclear steam supply system (NSSS) design. The System 80 NSSS is the Combustion Engineering (C-E) standard design rated at 3817 Mwth. PVNGS Units 1 and 2 achieved commercial operation on February 13, 1986 and September 22, 1986, respectively, while Unit 3 has a forecast date for commercial operation in the third quarter of 1987. The System 80 design incorporates a reactor power cutback system (RPCS) feature which reduces plant trips caused by two common initiating events: loss of load/turbine trip (LOL) and loss of one main feedwater pump (LOMFWP). The key design objective of the RPCS is to improve overall plant availability and performance, while minimizing challenges to the plant safety system

  6. Recent experience related to neutronic transients in Ontario Hydro CANDU nuclear generating stations

    International Nuclear Information System (INIS)

    Frescura, G.M.; Smith, A.J.; Lau, J.H.

    1991-01-01

    Ontario Hydro presently operates 18 CANDU reactors in the province of Ontario, Canada. All of these reactors are of the CANDU Pressurized Heavy Water design, although their design features differ somewhat reflecting the evolution that has taken place from 1971 when the first Pickering unit started operation to the present as the Darlington units are being placed in service. Over the last three years, two significant neutronic transients took place at the Pickering Nuclear Generating Station 'A' (NGS A) one of which resulted in a number of fuel failures. Both events provided valuable lessons in the areas of operational safety, fuel performance And accident analysis. The events and the lessons learned are discussed in this paper

  7. Radioactive emission data from Canadian nuclear generating stations 1986 to 1995

    International Nuclear Information System (INIS)

    1997-05-01

    All nuclear generating station (NGSs) release small quantities of radioactivity in a controlled manner into both the atmosphere (as gaseous effluents) and adjoining water bodies (as liquid effluents). The purpose of this document is to report on the magnitude of these emissions for each operating NGS in Canada and to indicate how these emissions compare with the relevant limitations imposed by the AECB as part of its regulatory and licensing program. The data show that the levels of emissions of gaseous and liquid effluents from all currently operating NGSs are well below the values mandated by the AECB. In fact, since 1987 no emissions have exceeded 1% of those values. 3 tabs., 46 figs

  8. A multi state simulation model of the maintenance for a power generating station

    International Nuclear Information System (INIS)

    Karlsson, B.O.

    1980-09-01

    A multistate simulation model for a thermal power generating station is described. The performance is modelled as a function of the system structure, the component reliability, the number of repair crews, the repair times and the availability of spare parts. Each component can be in either of four states: failed, working, postponed, or standby. A component will be in the postponed state, if due to failures in other components it is turned off. Two different types of failures are assumed: minor and severe. Evaluation of the system state is performed by repeated use of four elementary system functions: series, parallel, k-out-of-n, and standby k/l/n. Numerical results for a case study are presented. (author)

  9. Risk impact of planned maintenance configuration at South Texas Project Electric Generating Station

    International Nuclear Information System (INIS)

    Loh, W.T.; Fleming, K.N.; Grantom, C.R.

    2004-01-01

    This paper is based on a study done for the Houston Lighting and Power Company. The purpose of this study is to estimate the risk impact of planned maintenance configurations at South Texas Project Electric Generating Station (STPEGS). To date, the focus of the STP probabilistic safety assessment (PSA) program has been to analyze risk in terms of estimates of accident frequencies that are expressed on a time-averaged basis. Thus, estimates of quantities such as severe core damage frequency have been made such that the temporal variations of this frequency with changing plant configurations are averaged out over time. The only condition that has been imposed on these estimates is that the plant is initially operating at full power when potential initiating events might occur. (author)

  10. Thermal mapping studies at Kadra reservoir near Kaiga generating station site

    International Nuclear Information System (INIS)

    Ravi, P.M.; Nayak, P.D.; Sudhakar, J.; Mishra, D.G.; Hegde, A.G.

    2007-01-01

    An inherent problem in nuclear and thermal power plants are the release of heat energy into the environment through cooling system to water bodies such as lakes, rivers, estuaries and oceans. Two NPPs of Kaiga Generating Station, discharge the thermal effluent to the nearby Kadra reservoir. This paper presents the results of three year long comprehensive thermal mapping studies conducted by ESL, KGS as part of the Thermal Ecological Studies sponsored by Board of Research in Nuclear Sciences (BRNS), Department of Atomic Energy. Present studies clearly demonstrate that the thermally influenced zone in the reservoir is limited to a small volume of the reservoir and is not likely to lead any irreversible adverse impact on the ecosystem of the reservoir. (author)

  11. Comparative study of the hydrogen generation during short term station blackout (STSBO) in a BWR

    International Nuclear Information System (INIS)

    Polo-Labarrios, M.A.; Espinosa-Paredes, G.

    2015-01-01

    Highlights: • Comparative study of generation in a simulated STSBO severe accident. • MELCOR and SCDAP/RELAP5 codes were used to understanding the main phenomena. • Both codes present similar thermal-hydraulic behavior for pressure and boil off. • SCDAP/RELAP5 predicts 15.8% lower hydrogen production than MELCOR. - Abstract: The aim of this work is the comparative study of hydrogen generation and the associated parameters in a simulated severe accident of a short-term station blackout (STSBO) in a typical BWR-5 with Mark-II containment. MELCOR (v.1.8.6) and SCDAP/RELAP5 (Mod.3.4) codes were used to understand the main phenomena in the STSBO event through the results comparison obtained from simulations with these codes. Due that the simulation scope of SCDAP/RELAP5 is limited to failure of the vessel pressure boundary, the comparison was focused on in-vessel severe accident phenomena; with a special interest in the vessel pressure, boil of cooling, core temperature, and hydrogen generation. The results show that at the beginning of the scenario, both codes present similar thermal-hydraulic behavior for pressure and boil off of cooling, but during the relocation, the pressure and boil off, present differences in timing and order of magnitude. Both codes predict in similar time the beginning of melting material drop to the lower head. As far as the hydrogen production rate, SCDAP/RELAP5 predicts 15.8% lower production than MELCOR

  12. Environmental radiological studies downstream from Rancho Seco Nuclear Power Generating Station

    International Nuclear Information System (INIS)

    Noshkin, V.E.; Wong, K.M.; Eagle, R.J.; Dawson, J.W.; Brunk, J.L.; Jokela, T.A.

    1985-01-01

    This report summarizes the information compiled in 1984 while assessing the environmental impact of radionuclides in aquatic releases from the Rancho Seco Nuclear Power Generating Station. Gamma-emitting radionuclides discharged since 1981 are found in many of the dietary components derived from the creeks receiving the effluent wastewater. Some soils and crops are found to contain radionuclides that originate from the contaminated water that was transferred to land during the irrigation season. 134 Cs and 137 Cs are the primary gamma-emitting radionuclides detected in the edible flesh of fish from the creeks. Concentrations in the flesh of fish decreased exponentially with distance from the plant. No significant differences in the 137 Cs activity were found between male and female fish of equal size, but concentrations may vary in fish of different size, with the season and diet. 21% of the total 137 Cs and 134 Cs discharged between 1981 and 1984 is associated with the creek sediments to a distance of 27 km from the plant. Fractions of the missing inventory have been transferred to land during the irrigation season or to downstream regions more distant than 27 km from the plant. The radiocesium content of the sediments in 1984 decreased significantly in a downstream direction, much in the same manner as concentrations decreased in fish. Radioactivity originating from the plant was not above detection limits in any terrestrial food item sampled beyond 6.5 km from the plant. Based on the usage factors provided by individuals interviewed in a 1984 survey, the fish and aquatic-organism ingestion pathway contributed the largest radiological dose to humans utilizing products contaminated with the radionuclides in the liquid wastes discharged from the Rancho Seco Nuclear Power Generating Station in 1984

  13. Effects of steam generator sectioning on the reliability of a nuclear power station containing a fast reactor

    International Nuclear Information System (INIS)

    Klemin, A.I.; Frolov, E.V.; Samoilov, O.B.

    1984-01-01

    Adequate reliability in the individual units and in the station as a whole must be provided in order to meet current specifications for the economic performance and safety of nuclear power stations. In the case of sodium-cooled fast reactors, a current problem is to improve the reliability in the steam generators of sodium-water type. Various Soviet and foreign designs for such reactors use sectional steam generators, which raise the reliability and safety of the station because they localize possible faults caused by leaks in the SG heatexchanger tubes to a single steam-generating section. The SG sectioning makes it necessary to incorporate factors into the reliability model such as the steam generator repair strategy, the number of steamgenerating sections in one cooling loop, and the working constraints on the available unit power. The authors present a model that has been used to examine the effects of these factors on the reliability of a fast-reactor system

  14. 78 FR 47795 - In the Matter of Entergy Nuclear Generation Company Pilgrim Power Station Independent Spent Fuel...

    Science.gov (United States)

    2013-08-06

    ... Entergy Nuclear Generation Company Pilgrim Power Station Independent Spent Fuel Storage Installation Order... Generation Company (Entergy), authorizing the operation of an Independent Spent Fuel Storage installation (ISFSI), in accordance with its regulations. This Order is being issued to Entergy because it has...

  15. AECB staff annual assessment of the Pickering A and B Nuclear Generating Stations for the year 1995

    International Nuclear Information System (INIS)

    1996-06-01

    This report is the Atomic Energy Control Board (AECB) staff assessment of safety at the Pickering Nuclear Generating Station (PNGS-A and PNGS-B) for 1995. Our on-site Project Officers and Ottawa-based specialists monitored the stations throughout the year. In 1995, compliance with the Transportation Packaging of Radioactive Materials Regulations and the Cost Recovery Fees Regulations was satisfactory. The performance of the special safety systems was good. Releases of radioactive materials from the station were low and well below the legal limits for public safety. 10 tabs., 7 figs

  16. Tenth target fabrication specialists' meeting: Proceedings

    International Nuclear Information System (INIS)

    Foreman, L.R.; Stark, J.C.

    1995-01-01

    This tenth meeting of specialists in target fabrication for inertial confinement is unique in that it is the first meeting that was completely unclassified. As a result of the new classification, we were able to invite more foreign participation. In addition to participants from the US, UK, and Canada, representatives from France, Japan, and two Russian laboratories attended, about 115 in all. This booklet presents full papers and poster sessions. Indirect and direct drive laser implosions are considered. Typical topics include: polymer or aluminium or resorcinol/formaldehyde shells, laser technology, photon tunneling microscopy as a characterization tool, foams, coatings, hohlraums, and beryllium capsules. Hydrogen, deuterium, tritium, and beryllium are all considered as fuels

  17. Tenth target fabrication specialists` meeting: Proceedings

    Energy Technology Data Exchange (ETDEWEB)

    Foreman, L.R.; Stark, J.C. [comp.

    1995-11-01

    This tenth meeting of specialists in target fabrication for inertial confinement is unique in that it is the first meeting that was completely unclassified. As a result of the new classification, we were able to invite more foreign participation. In addition to participants from the US, UK, and Canada, representatives from France, Japan, and two Russian laboratories attended, about 115 in all. This booklet presents full papers and poster sessions. Indirect and direct drive laser implosions are considered. Typical topics include: polymer or aluminium or resorcinol/formaldehyde shells, laser technology, photon tunneling microscopy as a characterization tool, foams, coatings, hohlraums, and beryllium capsules. Hydrogen, deuterium, tritium, and beryllium are all considered as fuels.

  18. 78 FR 77726 - Exelon Generation Company, LLC Three Mile Island Nuclear Station, Unit 1

    Science.gov (United States)

    2013-12-24

    ... Three Mile Island Nuclear Station, Unit 1 AGENCY: Nuclear Regulatory Commission. ACTION: Exemption... License No. DPR-50, which authorizes operation of the Three Mile Island Nuclear Station, Unit 1 (TMI-1... Facility Operating License No. DPR-50, which authorizes operation of the Three Mile Island Nuclear Station...

  19. 75 FR 36700 - Exelon Generation Company, LLC; Three Mile Island Nuclear Station, Unit 1; Environmental...

    Science.gov (United States)

    2010-06-28

    ...; Three Mile Island Nuclear Station, Unit 1; Environmental Assessment and Finding of No Significant Impact... Company, LLC (the licensee), for operation of Three Mile Island Nuclear Station, Unit 1 (TMI-1), located... Three Mile Island Nuclear Station, Units 1 and 2, NUREG-0552, dated December 1972, and Generic...

  20. Development of the Next Generation Gas Trap for the Space Station Internal Thermal Control System

    Science.gov (United States)

    Leimkuehler, Thomas O.; Spelbring, Chris; Reeves, Daniel R.; Holt, James M.

    2003-01-01

    The current dual-membrane gas trap is designed to remove non-condensed gases (NCG) from the Internal Thermal Control System (ITCS) coolant on board the International Space Station (ISS). To date it has successfully served its purpose of preventing depriming, overspeed, and shutdown of the ITCS pump. However, contamination in the ITCS coolant has adversely affected the gas venting rate and lifetime of the gas trap, warranting a development effort for a next-generation gas trap. Design goals are to meet or exceed the current requirements to (1) include greater operating ranges and conditions, (2) eliminate reliance on the current hydrophilic tube fabrication process, and (3) increase operational life and tolerance to particulate and microbial growth fouling. In addition, the next generation gas trap will essentially be a 'dropin" design such that no modifications to the ITCS pump package assembly (PPA) will be required, and the implementation of the new design will not affect changes to the ITCS operational conditions, interfaces, or software. This paper will present the initial membrane module design and development work which has included (1) a trade study among several conceptual designs, (2) performance modeling of a hydrophobic-only design, and (3) small-scale development test data for the hydrophobic-only design. Testing has shown that the hydrophobic-only design is capable of performing even better than the current dual-membrane design for both steady-state gas removal and gas slug removal.

  1. Use of intelligent loop diagrams at San Onofre Nuclear Generation Station (SONGS)

    International Nuclear Information System (INIS)

    Groves, J.E.; Johnson, K.I.; Foulk, J.; Reinschmidt, K.F.; Tutos, N.C.

    1991-01-01

    The use of advanced information systems will result in five million dollars potential cost reduction and two years less time for producing over 2000 Instrumentation and Control Loop Diagrams for the three nuclear units at San Onofre Nuclear Generating Station (SONGS). This new information technology will also assist plant management at SONGS in generating even larger savings from reduction in operations and maintenance costs. The key element of the new solution is the use of plant drawings, the traditional primary source of plant information, for on-line access to all plant databases and information systems, by replacing paper drawings with intelligent electronic drawings. The implementation of this concept for the Instrumentation and Control Loop Diagrams, presently in progress, is part of the Integrated Nuclear Data Management Systems (INDAMS) program at SONGS, a joint effort which includes support from Stone and Webster Advanced Systems Development Services, International Business Machines Corporation (IBM), and Dassault Systems of France. The initial results have encouraged plant management to speed up the implementation process

  2. The vibrational behaviour of the generator support structure for Koeberg nuclear power station at high frequencies

    International Nuclear Information System (INIS)

    Lee, D.E.

    1988-06-01

    The vibrational behaviour of the generator support structure at Koeberg nuclear power station at frequencies primarily in the region of 80 Hz to 110 Hz was examined. The effect of soil-structure interaction and the change in stiffness of the foundation soil was investigated. Vibration tests were performed on the generator support structure and the results were compared with a theoretical finite element analysis of the structure. By varying the soil-cement foundation stiffness it was possible to demonstrate the change in dynamic behaviour of the structure in the higher frequency band 80 Hz to 110 Hz. Comment has been made on the design code DIN 4024 in view of the findings of this thesis. It was concluded that the empirical rules regarding the inclusion of the foundation in an analysis specified by the code do not cover all cases and greater cognisance of the effect of the foundation stiffness on the vibration behaviour of such machine foundations is necessary. Obvious machine frequencies higher than the operational frequencies should be analysed where it is considered necessary. 24 refs., 25 tabs., 83 figs

  3. Measurements of tritium (HTO, TFWT, OBT) in environmental samples at varying distances from a nuclear generating station

    Energy Technology Data Exchange (ETDEWEB)

    Kotzer, T.G.; Workman, W.J.G

    1999-12-01

    Concentrations of tritium have been measured in environmental samples (vegetation, water, soil, air) from sites distal and proximal to a CANDU nuclear generating station in Southern Ontario (OPG-Pickering). Levels of tissue-free water tritium (TFWT) and organically bound tritium (OBT) in vegetation are as high as 24,000 TU immediately adjacent to the nuclear generating station and rapidly decrease to levels of tritium which are comparable to natural ambient concentrations for tritium in the environment (approximately {<=} 60 TU). Tritium concentrations (OBT, TFTW) have also been measured in samples of vegetation and tree rings growing substantial distances away from nuclear generating stations and are within a factor of 1 to 2 of the ambient levels of tritium measured in precipitation in several parts of Canada (approximately {<=}30 TU). (author)

  4. Evidence of Intercultural Communication Competence in Tenth Grader's Narrative Texts

    Science.gov (United States)

    Guerrero Moya, María Eulalia; Muñoz Ortiz, Liliana; Niño Díaz, Ana María

    2016-01-01

    This action research study explored the effects of an intervention linking both culture and citizenship in a tenth-grade English language class, and aimed at finding evidence of intercultural communicative competence (ICC) skills through the writing of narrative texts in English. Participants were 75 tenth-grade students, between the ages of 14…

  5. Chemical Research Society of India – Tenth Anniversary

    Indian Academy of Sciences (India)

    WINTEC

    The Chemical Research Society of India (CRSI) established in 1999 completes its tenth year during the Tenth ... cuss and share their research contributions with colleagues and foster the growth of chemical research and ... We have been fortunate to have the excellent co-operation and help from authors, refe- rees and the ...

  6. Chemical Research Society of India – Tenth Anniversary

    Indian Academy of Sciences (India)

    WINTEC

    The Chemical Research Society of India (CRSI) established in 1999 completes its tenth year during the Tenth National Symposium (NSC-10; February 2008) in Bangalore at the. Indian Institute of Science. The Society has been providing a forum for chemists to dis- cuss and share their research contributions with ...

  7. Type test of Class 1E electric cables, field splices, and connections for nuclear power generating stations - 1975

    International Nuclear Information System (INIS)

    Anon.

    1976-01-01

    This Standard provides direction for establishing type tests which may be used in qualifying Class 1E electric cables, field splices, and other connections for service in nuclear power generating stations. General guidelines for qualifications are given in IEEE Std 323-1974, Standard for Qualifying Class 1E Electric Equipment for Nuclear Power Generating Stations. Categories of cables covered are those used for power control and instrumentation services. Though intended primarily to pertain to cable for field installation, this guide may also be used for the qualification of internal wiring of manufactured devices

  8. Space solar power stations. Problems of energy generation and using its on the earth surface and nearest cosmos

    Science.gov (United States)

    Sinkevich, OA; Gerasimov, DN; Glazkov, VV

    2017-11-01

    Three important physical and technical problems for solar power stations (SPS) are considered: collection of solar energy and effective conversion of this energy to electricity in space power stations, energy transportation by the microwave beam to the Earth surface and direct utilization of the microwave beam energy for global environmental problems. Effectiveness of solar energy conversion into electricity in space power stations using gas and steam turbines plants, and magneto-hydrodynamic generator (MHDG) are analyzed. The closed cycle MHDG working on non–equilibrium magnetized plasmas of inert gases seeded with the alkaline metal vapors are considered. The special emphases are placed on MHDG and gas-turbine installations that are operating without compressor. Also opportunities for using the produced by space power stations energy for ecological needs on Earth and in Space are discussed.

  9. Information technology as a key enabler in preparing for competition: ComEd's Kincaid Generating Station, a work in progress

    International Nuclear Information System (INIS)

    Borth, F.C. III; Thompson, J.W.; Mishaga, J.M.

    1996-01-01

    Through ComEd Fossil (Generating) Division's Competitive Action Plan (CAP) evaluation changes have been identified which are necessary to improve generating station performance. These changes are intended to improve both station reliability and financial margins, and are essential for stations to be successful in a competitive marketplace. Plant upgrades, advanced equipment stewardship, and personnel reductions have been identified as necessary steps in achieving industry leadership and competitive advantage. To deal effectively with plant systems and contend in the competitive marketplace Information Technology (IT) solutions to business problems are being developed. Data acquisition, storage, and retrieval are being automated through use of state-of-the-art Data Historians. Total plant, high resolution, long term process information will be accessed through Local/Wide Area Networks (LAN/WAN) connections from desktop PC's. Generating unit Thermal Performance Monitors accessing the Data Historian will analyze plant and system performance enabling reductions in operating costs, and improvements in process control. As inputs to proactive maintenance toolsets this data allows anticipation of equipment service needs, advanced service scheduling, and cost/benefit analysis. The ultimate goal is to optimize repair needs with revenue generation. Advanced applications building upon these foundations will bring knowledge of the costs associated with all the products a generating station offers its customer(s). An overall design philosophy along with preliminary results is presented; these results include shortfalls, lessons learned, and future options

  10. Aging management program of the reactor building concrete at Point Lepreau Generating Station

    Directory of Open Access Journals (Sweden)

    Gendron T.

    2011-04-01

    Full Text Available In order for New Brunswick Power Nuclear (NBPN to control the risks of degradation of the concrete reactor building at the Point Lepreau Generating Station (PLGS the development of an aging management plan (AMP was initiated. The intention of this plan was to determine the requirements for specific structural components of concrete of the reactor building that require regular inspection and maintenance to ensure the safe and reliable operation of the plant. The document is currently in draft form and presents an integrated methodology for the application of an AMP for the concrete of the reactor building. The current AMP addresses the reactor building structure and various components, such as joint sealant and liners that are integral to the structure. It does not include internal components housed within the structure. This paper provides background information regarding the document developed and the strategy developed to manage potential degradation of the concrete of the reactor building, as well as specific programs and preventive and corrective maintenance activities initiated.

  11. Review of Ontario Hydro Pickering 'A' and Bruce 'A' nuclear generating stations' accident analyses

    International Nuclear Information System (INIS)

    Serdula, K.J.

    1988-01-01

    Deterministic safety analysis for the Pickering 'A' and Bruce 'A' nuclear generating stations were reviewed. The methodology used in the evaluation and assessment was based on the concept of 'N' critical parameters defining an N-dimensional safety parameter space. The reviewed accident analyses were evaluated and assessed based on their demonstrated safety coverage for credible values and trajectories of the critical parameters within this N-dimensional safety parameter space. The reported assessment did not consider probability of occurrence of event. The reviewed analyses were extensive for potential occurrence of accidents under normal steady-state operating conditions. These analyses demonstrated an adequate assurance of safety for the analyzed conditions. However, even for these reactor conditions, items have been identified for consideration of review and/or further study, which would provide a greater assurance of safety in the event of an accident. Accident analyses based on a plant in a normal transient operating state or in an off-normal condition but within the allowable operating envelope are not as extensive. Improvements in demonstrations and/or justifications of safety upon potential occurrence of accidents would provide further assurance of adequacy of safety under these conditions. Some events under these conditions have not been analyzed because of their judged low probability; however, accident analyses in this area should be considered. Recommendations are presented relating to these items; it is also recommended that further study is needed of the Pickering 'A' special safety systems

  12. Environmental monitoring report for the Point Lepreau, New Brunswick nuclear generating station 1984

    International Nuclear Information System (INIS)

    Nelson, R.W.P.; Ellis, K.M.; Smith, J.N.

    1986-07-01

    The Point Lepreau Environmental Monitoring Program (PLEMP) has been established within the Department of Fisheries and Oceans to assess the environmental impact of radioactive, thermal, and chemical releases from the Point Lepreau, N.B. Nuclear Generating Station (NGS) located on the Bay of Fundy. This report contains the results for the second year of the operational phase of the monitoring program. Emphasis has been placed on those areas where effects from the NGS operation were expected to be observed. Further studies were carried out on the characterization of the thermal plume during several pre-arranged tritium releases. Attention was given to tritium levels at the outfall, in the atmosphere and in biological samples. An initial attempt was made to relate the distribution of tritium in the Point Lepreau area in various phases to local meteorological conditions. Radionuclide levels in lichen, including, for the first time, aerial lichen on a regular basis, an efficient accumulator of atmospheric particulates were monitored. In addition, radionuclide measurements were made on samples collected during the pre-operational phase from the major environmental reservoirs and these radioactivity levels were compared to previous measurements to assess the impact of the operation of the NGS. The purpose of this program is to provide government with a comprehensive scientific basis upon which to assess the environmental implications of the operation of nuclear reactors in coastal regions

  13. Navajo Generating Station and Federal Resource Planning; Volume 1: Sectoral, Technical, and Economic Trends

    Energy Technology Data Exchange (ETDEWEB)

    Hurlbut, David; Haase, Scott; Barrows, Clayton; Bird, Lori; Brinkman, Greg; Cook, Jeff; Day, Megan; Diakov, Victor; Hale, Elaine; Keyser, David; Lopez, Anthony; Mai, Trieu; McLaren, Joyce; Reiter, Emerson; Stoll, Brady; Tian, Tian; Cutler, Harvey; Bain, Dominique; Acker, Tom

    2016-11-01

    This study for the U.S. Bureau of Reclamation examines conditions in the electricity sector that are likely to affect federal decisions with respect to Navajo Generating Station (NGS), the largest coal-fired power plant operating in the western United States. The federal government owns 24.3% of the 2.25-gigawatt plant, which amounts to 547 megawatts (MW) of capacity. By focusing on the unique public interests that depend on the federal share of NGS, this baseline study can help the federal government develop a road map for meeting all of its goals with respect to water delivery, clean energy, emission reduction, and economic development. There is no recommendation for action in this report. Rather, its aim is to provide a credible, thorough description of baseline conditions that might affect federal decisions regarding NGS. It describes facts and trends embedded in current data, but there are no conclusions about how Reclamation or DOI should respond to the trends. The interdependencies among the many sectoral trends and federal goals are complex, and the aim of this study is to provide a foundation from which options can be tested in a deliberate manner.

  14. The expected environmental consequences and hazards of laser-fusion electric generating stations

    International Nuclear Information System (INIS)

    Devaney, J.J.; Pendergrass, J.H.

    The operation of an expected early form of a laser-fusion electric power plant is described and the hazards and the environmental effects of such a station are estimated. Possible environmental impacts and hazards to mankind can occur from nuclear excursions or explosions, nuclear weapon proliferation, loss of coolant accident (LOCA), tritium releases, chemical fires and accompanying releases of radioactivity or chemicals, induced radioactivity releases (other than tritium), radioactive waste disposal, lasers, normal electrical generation and steam plant effects, external intrusions, natural disasters, land use, resource and transportation use, thermal pollution, and air and water pollution. We find the principle environmental effects to be those of a medium size chemical plant. Electric, magnetic, steam, and radioactive hazards are of a lower order. Indeed in the event of extraordinary success in getting high temperatures and densities so that more difficult nuclear species can be reacted, such as protons with boron-11, there will be no radioactivity at all and also enormously lower hazardous chemical inventories. In our plant designs, for any fusion fuels, nuclear explosions (or even excursions beyond design limits) are not possible. (author)

  15. Modeling Woody Biomass Procurement for Bioenergy Production at the Atikokan Generating Station in Northwestern Ontario, Canada

    Directory of Open Access Journals (Sweden)

    Thakur Upadhyay

    2012-12-01

    Full Text Available Efficient procurement and utilization of woody biomass for bioenergy production requires a good understanding of biomass supply chains. In this paper, a dynamic optimization model has been developed and applied to estimate monthly supply and procurement costs of woody biomass required for the Atikokan Generating Station (AGS in northwestern Ontario, based on its monthly electricity production schedule. The decision variables in the model are monthly harvest levels of two types of woody biomass, forest harvest residues and unutilized biomass, from 19,315 forest depletion cells (each 1 km2 for a one year planning horizon. Sixteen scenarios are tested to examine the sensitivity of the cost minimization model to changing economic and technological parameters. Reduction in moisture content and improvement of conversion efficiency showed relatively higher reductions in monthly and total costs of woody biomass feedstock for the AGS. The results of this study help in understanding and designing decision support systems for optimal biomass supply chains under dynamic operational frameworks.

  16. Navajo Generating Station and Clean-Energy Alternatives: Options for Renewables

    Energy Technology Data Exchange (ETDEWEB)

    Hurlbut, D. J.; Haase, S.; Turchi, C. S.; Burman, K.

    2012-06-01

    In January 2012, the National Renewable Energy Laboratory delivered to the Department of the Interior the first part of a study on Navajo Generating Station (Navajo GS) and the likely impacts of BART compliance options. That document establishes a comprehensive baseline for the analysis of clean energy alternatives, and their ability to achieve benefits similar to those that Navajo GS currently provides. This analysis is a supplement to NREL's January 2012 study. It provides a high level examination of several clean energy alternatives, based on the previous analysis. Each has particular characteristics affecting its relevance as an alternative to Navajo GS. It is assumed that the development of any alternative resource (or portfolio of resources) to replace all or a portion of Navajo GS would occur at the end of a staged transition plan designed to reduce economic disruption. We assume that replacing the federal government's 24.3% share of Navajo GS would be a cooperative responsibility of both the U.S. Bureau of Reclamation (USBR) and the Central Arizona Water Conservation District (CAWCD).

  17. Structural integrity analysis of the degraded drywell containment at the Oyster Creek Nuclear generating station.

    Energy Technology Data Exchange (ETDEWEB)

    Petti, Jason P.

    2007-01-01

    This study examines the effects of the degradation experienced in the steel drywell containment at the Oyster Creek Nuclear Generating Station. Specifically, the structural integrity of the containment shell is examined in terms of the stress limits using the ASME Boiler and Pressure Vessel (B&PV) Code, Section III, Division I, Subsection NE, and examined in terms of buckling (stability) using the ASME B&PV Code Case N-284. Degradation of the steel containment shell (drywell) at Oyster Creek was first observed during an outage in the mid-1980s. Subsequent inspections discovered reductions in the shell thickness due to corrosion throughout the containment. Specifically, significant corrosion occurred in the sandbed region of the lower sphere. Since the presence of the wet sand provided an environment which supported corrosion, a series of analyses were conducted by GE Nuclear Energy in the early 1990s. These analyses examined the effects of the degradation on the structural integrity. The current study adopts many of the same assumptions and data used in the previous GE study. However, the additional computational recourses available today enable the construction of a larger and more sophisticated structural model.

  18. Evaluation of options for life cycle management of feeder cracking at the Point Lepreau Generating Station

    International Nuclear Information System (INIS)

    Gendron, T.S.; Slade, J.P.

    2003-01-01

    The CANDU industry has a predictive capability for most Heat Transport System (HTS) degradation issues that allows utilities to apply cost-effective maintenance programs. The standard approach for maintenance programs is focussed inspection and planned replacement. Some examples of degradation issues with deterministic failure rates are feeder thinning, and pressure tube elongation and deuterium ingress. However, the cracking observed in Point Lepreau Generating Station (PLGS) outlet feeder first bends is one notable exception to this behaviour. A predictive capability for feeder cracking does not currently exist for several reasons. First, the mechanism of feeder cracking, stress corrosion cracking (SCC), has to some degree a random nature. Second, although a probable environment causing cracking has been identified, the precise stress and environmental conditions for feeder crack initiation and propagation have not been defined. Finally, the very low incidence of feeder cracking observed to-date (four, all at PLGS) precludes a probabilistic or statistical prediction of failure rate. Generally, utilities select a Life Cycle Management Plan that ensures safe operation and has the lowest Net Present Value cost. In preparing a Feeder Life Cycle Management Plan, New Brunswick Power (NBP) has recognized that the Net Present Value cost is very sensitive to failure rate. Since the failure rate for feeder cracking is not well defined, the following three scenarios were considered to bound the probability of future failures at PLGS. (author)

  19. Intake-to-delivered-energy ratios for central station and distributed electricity generation in California

    International Nuclear Information System (INIS)

    Heath, Garvin A.; Nazaroff, William W.

    2007-01-01

    In previous work, we showed that the intake fraction (iF) for nonreactive primary air pollutants was 20 times higher in central tendency for small-scale, urban-sited distributed electricity generation (DG) sources than for large-scale, central station (CS) power plants in California [Heath, G.A., Granvold, P.W., Hoats, A.S., Nazaroff, W.W., 2006. Intake fraction assessment of the air pollutant exposure implications of a shift toward distributed electricity generation. Atmospheric Environment 40, 7164-7177]. The present paper builds on that study, exploring pollutant- and technology-specific aspects of population inhalation exposure from electricity generation. We compare California's existing CS-based system to one that is more reliant on DG units sited in urban areas. We use Gaussian plume modeling and a GIS-based exposure analysis to assess 25 existing CSs and 11 DG sources hypothetically located in the downtowns of California's most populous cities. We consider population intake of three pollutants - PM 2.5 , NO x and formaldehyde - directly emitted by five DG technologies - natural gas (NG)-fired turbines, NG internal combustion engines (ICE), NG microturbines, diesel ICEs, and fuel cells with on-site NG reformers. We also consider intake of these pollutants from existing CS facilities, most of which use large NG turbines, as well as from hypothetical facilities located at these same sites but meeting California's best-available control technology standards. After systematically exploring the sensitivity of iF to pollutant decay rate, the iFs for each of the three pollutants for all DG and CS cases are estimated. To efficiently compare the pollutant- and technology-specific exposure potential on an appropriate common basis, a new metric is introduced and evaluated: the intake-to-delivered-energy ratio (IDER). The IDER expresses the mass of pollutant inhaled by an exposed population owing to emissions from an electricity generation unit per quantity of electric

  20. Intake-to-delivered-energy ratios for central station and distributed electricity generation in California

    Science.gov (United States)

    Heath, Garvin A.; Nazaroff, William W.

    In previous work, we showed that the intake fraction (iF) for nonreactive primary air pollutants was 20 times higher in central tendency for small-scale, urban-sited distributed electricity generation (DG) sources than for large-scale, central station (CS) power plants in California [Heath, G.A., Granvold, P.W., Hoats, A.S., Nazaroff, W.W., 2006. Intake fraction assessment of the air pollutant exposure implications of a shift toward distributed electricity generation. Atmospheric Environment 40, 7164-7177]. The present paper builds on that study, exploring pollutant- and technology-specific aspects of population inhalation exposure from electricity generation. We compare California's existing CS-based system to one that is more reliant on DG units sited in urban areas. We use Gaussian plume modeling and a GIS-based exposure analysis to assess 25 existing CSs and 11 DG sources hypothetically located in the downtowns of California's most populous cities. We consider population intake of three pollutants—PM 2.5, NO x and formaldehyde—directly emitted by five DG technologies—natural gas (NG)-fired turbines, NG internal combustion engines (ICE), NG microturbines, diesel ICEs, and fuel cells with on-site NG reformers. We also consider intake of these pollutants from existing CS facilities, most of which use large NG turbines, as well as from hypothetical facilities located at these same sites but meeting California's best-available control technology standards. After systematically exploring the sensitivity of iF to pollutant decay rate, the iFs for each of the three pollutants for all DG and CS cases are estimated. To efficiently compare the pollutant- and technology-specific exposure potential on an appropriate common basis, a new metric is introduced and evaluated: the intake-to-delivered-energy ratio (IDER). The IDER expresses the mass of pollutant inhaled by an exposed population owing to emissions from an electricity generation unit per quantity of electric

  1. Remote-sensing satellite ground station evaluation using QPSK emulator with test pattern and PRBS generation

    Science.gov (United States)

    Srinivas, R.; Nithyanandan, L.; Umadevi, G.; Padmavathi, C. S.; Nayani, Radha

    2015-12-01

    In order to validate the performance of X-band (8000-8400 MHz) remote-sensing satellite receive chain, when the satellite is not in the vicinity of ground station, local loop end-end evaluation tests are mandatory to certify the RF downlink and base band receive chain performance. A customised test patterns compatible to IRS satellite series and PRBS sequence are generated, which are modulated using QPSK emulator to check and verify the satellite downlink chain performance. The design and implementation are done using novel digital techniques, and QPSK modulator is integrated with Test pattern and PRBS generator using state-of-art FPGAs. The QPSK emulator output is connected to high-speed fibre optic link which transfers the signal to near field bore-site antenna system. The test signal is thus up converted from 2557.5 MHz (S-band) frequency to required satellite carrier frequency of 8212.5 MHz; the emulated test signal is radiated from bore-site antenna, which simulates real-time satellite data transmission from space. Thus, the signal received by the parabolic dish antenna is down converted to 720 MHz, demodulated, bit synchronized, clock recovered, and frame synchronized. The evaluation of frame sync errors is done for good video data quality check. Also in the QPSK emulator, there is option of PRBS mode. Hence, using this option, the RF downlink and receive chain are evaluated for good Bit error rate (BER). The BER requirement is 1 error (tolerable) in 106 Million bits. The QPSK emulator has the provision to support different frequencies and data rates corresponding to all IRS satellite missions.

  2. Tenth annual underground coal gasification symposium: proceedings

    Energy Technology Data Exchange (ETDEWEB)

    Burwell, E.; Docktor, L.; Martin, J.W. (eds.)

    1984-12-01

    The Tenth Annual Underground Coal Gasification Symposium was cosponsored by the Fossil Energy Division of the US Department of Energy and the Morgantown Energy Technology Center's Laramie Projects Office. The purpose of the symposium was to provide a forum for presenting research results and for determining additional research needs in underground coal gasification. This years' meeting was held in Williamsburg, Virginia, during the week of August 12 through 15, 1984. Approximately 120 attendees representing industry, academia, national laboratories, Government, and eight foreign countries participated in the exchange of ideas, results, and future research plans. International representatives included participants from Belgium, Brazil, France, the Netherlands, New Zealand, Spain, West Germany, and Yugoslavia. During the three-day symposium, sixty papers were presented and discussed in four formal presentation sessions and two informal poster sessions. The papers describe interpretation of field test data, results of environmental research, and evaluations of laboratory, modeling, and economic studies. All papers in this Proceedings have been processed for inclusion in the Energy Data Base.

  3. 75 FR 53985 - Arizona Public Service Company, et al., Palo Verde Nuclear Generating Station, Unit 3; Temporary...

    Science.gov (United States)

    2010-09-02

    ... NUCLEAR REGULATORY COMMISSION [Docket No. STN 50-530; NRC-2010-0281] Arizona Public Service Company, et al., Palo Verde Nuclear Generating Station, Unit 3; Temporary Exemption 1.0 Background Arizona Public Service Company (APS, the licensee) is the holder of Facility Operating License No. NPF-74, which...

  4. AECB staff annual assessment of the Pickering A and B Nuclear Generating Stations for the year 1996

    International Nuclear Information System (INIS)

    1997-06-01

    The Atomic Energy Control Board is the independent federal agency that controls all nuclear activities in Canada. A major use of nuclear energy in Canada is electricity production. The AECB assesses every station's performance against legal requirements, including the conditions in the operating licence. Each station is inspected and all aspects of the station's operation and management is reviewed. This report is the AECB staff assessment of reactor safety at the Pickering A and B Generating Stations for 1996. PNGS-A and PNGS-B operated safely during 1996. Although the risk to the workers and the public is low, major safety related changes are necessary at the stations and the sustainability of those changes needs to be demonstrated. Improvement is needed by Ontario Hydro in meeting the time limits for reporting reportable events. Ontario Hydro's follow up to events and causal factor analyses continue to need improvements. Improvements are needed to operational safety and reactor maintenance at both A and B. There are signs of improvement through Ontario Hydro's plan for recovery, and in station management changes. There also appears to be commitment to safety expressed at the highest level of the utility

  5. Tenth ORNL Personnel Dosimetry Intercomparison Study

    International Nuclear Information System (INIS)

    Swaja, R.E.; Chou, T.L.; Sims, C.S.; Greene, R.T.

    1985-03-01

    The Tenth Personnel Dosimetry Intercomparison Study was conducted at the Oak Ridge National Laboratory during April 9-11, 1984. Dosemeter badges from 31 participating organizations were mounted on 40cm Lucite phantoms and exposed to a range of dose equivalents which could be encountered during routine personnel monitoring in mixed radiation fields. The Health Physics Research Reactor served as the only source of radiation for eight of the ten irradiations which included a low (approx. 0.50 mSv) and high (approx. 10.00 mSv) neutron dose equivalent run for each of four shield conditions. Two irradiations were also conducted for which concrete- and Lucite-shield reactor irradiations were gamma-enhanced using a 137 Cs source. Results indicated that some participants had difficulty obtaining measurable indication of neutron and gamma exposures at dose equivalents less than about 0.50 mSv and 0.20 mSv, respectively. Albedo dosemeters provided the best overall accuracy and precision for the neutron measurements. Direct interaction TLD systems showed significant variation in accuracy with incident spectrum, and threshold neutron dosemeters (film and recoil track) underestimated reference values by more than 50%. Gamma dose equivalents estimated in the mixed fields were higher than reference values with TL gamma dosemeters generally yielding more accurate results than film. Under the conditions of this study in which participants had information concerning exposure conditions and radiation field characteristics prior to dosemeter evaluation, only slightly more than half of all reported results met regulatory standards for neutron and gamma accuracy. 19 refs., 2 figs., 29 tabs

  6. Data communications method for mobile network in fourth generation communications system, involves delivering decoded data to mobile station from relay station, where mobile station receives data from both relay and base stations

    DEFF Research Database (Denmark)

    2008-01-01

    The method involves utilizing a base station (BS) (100) to transmit data to a relay station (RS) (110) and a mobile station (MS) (120), where the data includes two messages. The BS is utilized to transmit the two messages by utilizing a linear combination method, and the data is received in the RS...... and decoded. The decoded data is delivered to the MS from the RS, where the RS transmits the decoded data by utilizing another linear combination method. The MS receives data from both the BS and the RS....

  7. 3D geological and hydrogeological modeling as design tools for the Conawapa generating station

    Energy Technology Data Exchange (ETDEWEB)

    Mann, J.; Sharif, S.; Smith, B. [KGS Group, Winnipeg, MB (Canada); Cook, G.N.; Osiowy, B.J. [Manitoba Hydro, Winnipeg, MB (Canada)

    2008-07-01

    Following the project's suspension in the early 1990s, part of Manitoba Hydro's recommitment study involved digital modeling of geological and hydrogeological data for the foundation design and analysis of the proposed Conawapa generating station in northern Manitoba. Three-dimensional geological and hydrogeological models have been developed to consolidate and improve the designer's ability to understand all of the information, and to assist in developing engineering alternatives which will improve the overall confidence of the design. The tools are also being leveraged for use in environmental studies. This paper provided an overview of the Conawapa site and 3-dimensional modeling goals. It described the geology and hydrogeology of the Conawapa site as well as the bedrock structure and Karst development. The paper also presented the central concepts of 3-dimensional modeling studies, including the flow of information from database to modeling software platforms. The construction of the Conawapa geological model was also presented, with particular reference to an overview of the MVS software; mesh design; and model buildup logic. The construction of the Conawapa hydrogeological model was discussed in terms of the finite element code FEFLOW software; conceptual model design; and initial observations of Conawapa groundwater flow modeling. It was concluded that recent advancement and application of 3-dimensional geological visualization software to engineering and environmental projects, including at the future Conawapa site using MVS and FEFLOW, have shown that complicated geological data can be organized, displayed, and analysed in a systematic way, to improve site visualization, understanding, and data relationships. 19 refs., 9 figs.

  8. An artificial intelligence (AI) NOx/heat rate optimization system for Ontario Hydro`s fossil generating stations

    Energy Technology Data Exchange (ETDEWEB)

    Luk, J.; Frank, A.; Bodach, P. [Ontario Hydro, Toronto, ON (Canada); Warriner, G. [Radian International, Tucker, GA (United States); Noblett, J. [Radian International, Austin, TX (United States); Slatsky, M. [Southern Company, Birmingham, AL (United States)

    1999-08-01

    Artificial intelligence (AI)-based software packages which can optimize power plant operations that improves heat rate and also reduces nitrogen oxide emissions are now commonly available for commercial use. This paper discusses the implementation of the AI-based NOx and Heat Rate Optimization System at Ontario Hydro`s generation stations, emphasizing the current AI Optimization Project at Units 5 and 6 of the Lakeview Generating Station. These demonstration programs are showing promising results in NOx reduction and plant performance improvement. The availability of the plant Digital Control System (DCS) in implementing AI optimization in a closed-loop system was shown to be an important criterion for success. Implementation of AI technology at other Ontario Hydro fossil generating units as part of the overall NOx emission reduction system is envisaged to coincide with the retrofit of the original plant control system with the latest DCS systems. 14 refs., 3 figs.

  9. AECL's participation in the commissioning of Point Lepreau generating station unit 1

    International Nuclear Information System (INIS)

    Chawla, S.; Singh, K.; Yerramilli, S.

    1983-05-01

    Support from Atomic Energy of Canada Ltd. (AECL) to Point Lepreau during the commissioning program has been in the form of: seconded staff for commissioning program management, preparation of commissioning procedures, and hands-on commissioning of several systems; analysis of test results; engineering service for problem solving and modifications; design engineering for changes and additions; procurement of urgently-needed parts and materials; technological advice; review of operational limits; interpretation of design manuals and assistance with and preparation of submissions to regulatory authorities; and development of equipment and procedures for inspection and repairs. This, together with AECL's experience in the commissioning of other 600 MWe stations, Douglas Point and Ontario Hydro stations, provides AECL with a wide range of expertise for providing operating station support services for CANDU stations

  10. The next nuclear power station generation: Beyond-design accident concepts, methods, and action sequence

    International Nuclear Information System (INIS)

    Asmolov, V.G.; Khakh, O.Ya.; Shashkov, M.G.

    1993-01-01

    The problem of beyond-design accidents at nuclear stations will not be solved unless a safety culture becomes a basic characteristic of all lines of activity. Only then can the danger of accidents as an objective feature of nuclear stations be eliminated by purposive skilled and responsible activities of those implementing safety. Nuclear-station safety is provided by the following interacting and complementary lines of activity: (1) the design and construction of nuclear stations by properly qualified design and building organizations; (2) monitoring and supervision of safety by special state bodies; (3) control of the station by the exploiting organization; and (4) scientific examination of safety within the above framework and by independent organizations. The distribution of the responsibilities, powers, and right in these lines should be defined by a law on atomic energy, but there is not such law in Russian. The beyond-design accident problem is a key one in nuclear station safety, as it clear from the serious experience with accidents and numerous probabilistic studies. There are four features of the state of this topic in Russia that are of major significance for managing accidents: the lack of an atomic energy law, the inadequacy of the technical standards, the lack of a verified program package for nuclear-station designs in order to calculate the beyond-design accidents and analyze risks, and a lack of approach by designers to such accidents on the basis of international recommendations. This paper gives a brief description of three-forming points in the scientific activity: the general concept of nuclear-station safety, methods of analyzing and providing accident management, and the sequence of actions developed by specialists at this institute in recent years

  11. Tenth LAMPF users meeting, November 7--9, 1976

    International Nuclear Information System (INIS)

    Rosen, L.

    1977-03-01

    The text of a brief talk given before the Tenth LAMPF Users Meeting is presented. Progress made at the Clinton P. Anderson Meson Physics Facility is reported, and the schedule for current upgrading and typical operating cost increases are given

  12. IEEE recommended practice for the design and installation of electric pipe heating systems for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    The realization that electric pipe heating systems play an important role in the normal operation of both nuclear and non-nuclear processes in nuclear power generating stations is now coming of age. This is apparent by the increased amount of space being devoted to electric pipe heating in station technical specifications, system descriptions, and operating criteria. Such electric pipe heating systems are applied on borated water systems and on water treatment systems such as caustic. Since boric acid and caustics in water will crystalize or precipitate out of the solution, depending on their concentrations at temperatures above ambient, and since such crystallization can make the piping system inoperable for normal operation, electric pipe heating systems are required to keep the solutions and piping systems in a state to perform their intended functions. Electric pipe heating systems may also be applied on piping located outdoors at nuclear generating stations for the purpose of preventing the piping systems from freezing. It should be noted that each and all of these piping systems can include valves, pumps, strainers, tanks, and instrumentation components that can be rendered inoperable due to solutions crystalizing or freezing. Therefore, a definite need exists within the nuclear power industry for recommendations that provide a uniform method for the design and installation of electric pipe heating systems that meet the requirements for rendering reliable operation of the piping system. Without such recommendations, station reliability may be jeopardized

  13. Ring thermal shield piping modification at Pickering Nuclear Generating Station 'A' Unit 1

    International Nuclear Information System (INIS)

    Brown, R.; Cobanoglu, M.M.

    1995-01-01

    Each of the four Pickering Nuclear Generating Station A (PNGSA) CANDU units was constructed with its reactor and dump tank surrounded by a concrete Calandria Vault (CV). The Ring Thermal Shield (RTS) system at PNGSA units is a water cooled structure with internal cooling channels with the purpose of attenuating excessive heat flux from the calandria shell to the end shield rings and adjoining concrete (Figure 1). In newer CANDU units the reactor calandria vessel is surrounded by a large water filled shield tank which eliminates the requirement for the RTS system. The RTS structures are situated in the space between the calandria and the vault walls. Each RTS is assembled from eight flat sided carbon steel segments, tilted towards the calandria and supported from the end shield rings. Cooling water to the RTS is supplied by carbon steel cooling pipes with a portion of the pipe run embedded in the vault walls. Flow through each RTS is divided into two independent circuits, having an inlet and an outlet cooling line. There are four locations of RTS inlet and outlet cooling lines. The inlet lines are located at the bottom and the outlet lines at the top of the RTS. The 'L' shaped section of RTS inlet and outlet cooling lines, from the RTS waterbox to the start of embedded portion at the concrete wall, had become defective due to corrosion induced by excessive Moisture levels in the calandria vaults. An on-line leak sealing capability was developed and placed in service in all four PNGSA units. However, a leak found during the 1994 Unit 1 outage was too large,to seal with the current capability, forcing Ontario Hydro (OH) to develop a method to replace the corroded pipes. The repair project was subject to some lofty performance targets. All tools had to be able to withstand dose rates of up to 3000 Rem/hour. These tools, along with procedures and personnel had to successfully repair the RTS system within 6 months otherwise a costly outage extension would result. This

  14. Eddy current magnetic bias x-probe qualification and inspection of steam generator Monel 400 tubing in Pickering Nuclear Generating Station

    International Nuclear Information System (INIS)

    Lepine, B.A.; Van Langen, J.; Obrutsky, L.

    2006-01-01

    This paper presents an overview of the x-probe MB 350 eddy current inspection array probe, for detection of open OD axial crack-like flaws in Monel 400 tubes at Pickering Nuclear Generating Station. This report contains a selection of inspection results from the field inspections performed with this probe during the 2003 and 2004 period at Pickering Nuclear Generating Station A and B. During the 2003 in-service eddy current inspection results of Pickering Nuclear Generating Station A (PNGS-A) Unit 2, a 13 mm (0.5 inch) long axial indication was detected by the CTR1 bobbin and CTR2-C4 array probes in Tube R25-C52 of Steam Generator (SG) 11 in the hot leg sludge pile region. An experimental magnetic bias X-probe, specially designed by Zetec for inspection of Monel 400 tubing, was deployed and the indication was characterized as a potential out diameter (OD) axially oriented crack. Post-inspection tube pulling and destructive examination confirmed the presence of an Environmentally Assisted Crack (EAC), approximately 80% deep and 13mm long. Due to the significance of this discovery, Ontario Power Generation (OPG) requested AECL to initiate a program for qualification of the X-probe MB 350 for the detection of OD axial cracks in medium to high magnetic permeability μ r Monel 400 PNGS-A and B steam generator tubing at different locations. The X-probe MB 350 subsequently has been deployed as a primary inspection probe for crack detection for PNGS steam generators. (author)

  15. Field testing of behavioral barriers for cooling water intake structures -test site 1 - Pickering Nuclear Generating Station

    International Nuclear Information System (INIS)

    Patrick, P.H.; McKinley, R.S.; Micheletti, W.C.

    1988-01-01

    A multi-year research program was developed by the Electric Power Research Institute to evaluate the effectiveness of selected behavioral systems for fish exclusion at sites representative of different aquatic environments. The first test site was the Pickering Nuclear Generating Station (NGS) located on Lake Ontario which represented the Great Lakes environment. A single pneumatic popper, a low frequency, high amplitude sound deterrent, was found to effectively exclude adult alewife, the principal species impinged at Pickering NGS. An air bubble curtain, used either alone or combined with strobe lights, was not a consistent deterrent. Effectiveness of air bubbles was only enhanced when used in association with a popper. Strobe lights were the least effective of the three devices tested. Operation of all three devices together did not surpass the effectiveness of the popper when used alone. Sound deterrents show promise for fish exclusion at generating stations located on the Great Lakes

  16. Safety Evaluation Report related to the operation of Hope Creek Generation Station (Docket No. 50-354). Supplement No. 6

    International Nuclear Information System (INIS)

    1986-07-01

    Supplement No. 6 to the Safety Evaluation Report on the application filed by Public Service Electric and Gas Company on its own behalf as co-owner and as agent for the other co-owner, the Atlantic City Electric Company, for a license to operate Hope Creek Generating Station has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Lower Alloways Creek Township in Salem County, New Jersey. This supplement reports the status of certain items that has not been resolved at the time of the publication of the Safety Evaluation Report. This supplement supports the issuance of a full-power license to operate Hope Creek Generating Station

  17. Maintenance and life assessment of steam generators at Embalse Nuclear Station

    International Nuclear Information System (INIS)

    Luna, P.; Diaz, G.; Sveruga, H.; Sainz, R.

    2006-01-01

    The Embalse Nuclear Generating Station (ENGS) has four vertical I-800 U-tubes Steam Generators (SGs) manufactured by Babcock and Wilcox (B and W). They are one of the most important components from the point of view of safety and cost-related elements for potential life extensions in case of a replacement thereof. A Life Management program has been started covering the entire plant and starting with the Life Assessment (LA) of this component which consists in a systematic way to evaluate aging mechanisms focused on the plant refurbishment and life extension. Because of this, maintenance-based ageing assessment from beginning of operation is analyzed and current LA-frame maintenance and inspections programs are carried out in order to maintain a high availability of the SGs then to enable the planning for the plant life extension. The most important taken actions have been the Eddy Current (EC) In Service Inspection program which performs 100% of the tubes of two SG every 1.5 years started in 1992, the mechanical cleaning by blasting of the internal tube surface, the sludge removal from the secondary side tubesheet, the divider plate replacement, the installation of antivibration bars (AVB's), installation of TSP inspection ports and an exhaustive inspection of the secondary internals as a preliminary result of the Life Assessment started during early 2000. The most relevant aging mechanism up to 2004 was the Flow Accelerated Corrosion (FAC) of U-bend supports and consequent fretting of tubes. The eddy current inspections allowed the fretting degradation to be detected and mitigated by installing AVB's. Currently, efficiency of this mitigating action is being performed by vibration measurements and visual inspections. However, other degradation mechanism that could have origin due to the U-bend FAC like loose part damage (LPD) is being to be analyzed since could be an issue in the future. At present, FAC degradation on the cold leg side and sludge deposition on the

  18. Confirmatory Survey Results for the Reactor Building Dome Upper Structural Surfaces, Rancho Saco Nuclear Generating Station, Herald, California

    International Nuclear Information System (INIS)

    Wade C. Adams

    2006-01-01

    Results from a confirmatory survey of the upper structural surfaces of the Reactor Building Dome at the Rancho Seco Nuclear Generating Station (RSNGS) performed by the Oak Ridge Institute for Science and Education for the NRC. Also includes results of interlaboratory comparison analyses on several archived soil samples that would be provided by RSNGS personnel. The confirmatory surveys were performed on June 7 and 8, 2006

  19. Tritium releases from the Pickering Nuclear Generating Station and birth defects and infant mortality in nearby communities 1971-1988

    International Nuclear Information System (INIS)

    Johnson, K.C.; Rouleau, J.

    1991-10-01

    This study was commissioned to examine whether there were elevated rates of stillbirth, birth defects, or death in the first year of life between 1971 and 1988 among offspring of residents of communities within a 25-kilometre radius of the Pickering Nuclear Generating Station. The study was also to investigate whether there were any statistical associations between the monthly airborne or waterborne tritium emissions from the Pickering Nuclear Generating Station and the rates of these reproductive outcomes. Overall analysis did not support a hypothesis of increased rates of stillbirths, neonatal mortality or infant mortality near the Pickering Nuclear Generating Station, or a hypothesis of increased birth prevalence of birth defects for 21 of 22 diagnostic categories. The prevalence of Down Syndrome was elevated in both Pickering and Ajax; however, there was no consistent pattern between tritium release levels and Down Syndrome prevalence, chance could not be ruled out for the associations between Down Syndrome and tritium releases or ground-monitored concentrations, the association was detected in an analysis where multiple testing was done which may turn up significant associations by change, and maternal residence at birth and early in pregnancy needs to be verified. The association between Down Syndrome and low-level radiation remains indeterminate when existing evidence from epidemiological studies is summed. The estimated radiation exposure from the nuclear plant for residents of Pickering and Ajax is lower by a factor of 100 than the normal natural background radiation. Further study is recommended. (21 tabs., 29 figs., 5 maps, 37 refs.)

  20. Management of main generator condition during long term plant shut down at Higashidori Nuclear Power Station Unit 1

    International Nuclear Information System (INIS)

    Kato, Seiji

    2014-01-01

    Higashidori Nuclear Power Station Unit 1 shut down on February 6, 2011 to start 4th refuel outage. On March 11, 2011, we keep going refuel outage on this moment a large earthquake occurred and tsunami was generated following it which called 'Great East Japan Earthquake'. Refuel outage takes 3 ∼ 5 months normally but Higashidori NPS still keeping shut down over 3 years due to some issues. In this paper, we introduce about management of Main generator condition during long term plant shut down situation in addition to normal plant shut down situation to keep well. (author)

  1. Different methods of informing the public on projected sites of nuclear generating stations. Results in France

    International Nuclear Information System (INIS)

    Taccoen, L.B.C.

    1977-01-01

    The situation in France of local public opinion concerning nuclear power stations is very different, according to the region in question. It seems that in industrialized regions, where the inhabitants are already familiar with nuclear energy, public opinion is much more open to the installation of new reactors. In regions which are only slightly industrialized, however, the prejudices of the population against nuclear energy can be very strong. This situation is quite serious because it could lead to an even greater widening of the development gap between various regions in France. Electricite de France has thus been led to develop a program of public information concerning the problems of nuclear energy. In practice, this program consists of: a policy of active presence in meeting and debates as well as at the actual site; eventual opening of information centers; and organization of visists of existing nuclear power stations [fr

  2. Draft environmental statement related to the operation of Hope Creek Generating Station (Docket No. 50-354)

    International Nuclear Information System (INIS)

    Wagner, D.H.

    1984-06-01

    This report contains an assessment of the environmental impact associated with the operation of the Hope Creek Generating Station pursuant to the National Environment Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environmental impacts, environmental consequences and mitigating actions, and environmental and economic benefits and costs associated with station operation. Land use and terrestrial and aquatic ecological impacts will be small. No operational impacts to historic and archeological sites are anticipated. The effects of routine operations, energy transmission, and periodic maintenance of rights-of-way and transmission facilities should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity. The risk of radiation exposure associated with accidental release of radioactivity is very low. Socioeconomic impacts of the project are anticipated to be minimal. The action called for is the issuance of an operating license for Hope Creek Generating Station, Unit 1

  3. Salem Nuclear Generating Station, Unit 1. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Initial reactor criticality was achieved 12/11/76 and power generation began 12/25/76. Information is presented concerning operation, maintenance, procedure and specification changes, power generation, unit shutdowns and forced power reductions, testing, and personnel radiation exposures

  4. Optimizing the use of operating experience at Ontario Hydro's Bruce Nuclear Generating Station 'A'

    International Nuclear Information System (INIS)

    Williams, E.L.

    1991-01-01

    One of the most significant lessons learned from the Three Mile Island event (March 1979), and again with the Chernobyl disaster - (April 1986) was the ongoing requirement to learn from our mistakes and near misses, and those of our fellow utilities around the world: so that as an industry we do not repeat the same mistakes. The very future of our industry will depend on how well each one of us accomplishes this important ask. This paper describes in detail the challenges encountered by one station when incorporating a comprehensive 'Operating Program'. It begins with the Corporate Office's directives to its stations for such a program; and follows up with the details of the actual station implementation of the program, and day to day operating experiences. The paper describes in detail the following Operating Experience programs: - Root Cause Determination process. The Institute of Nuclear Power Operations, Human Performance Enhancement System (HPES) as an integral component of the Root Cause process. Finding solutions for our station for problems identified elsewhere is covered herein; - Significant Event Recommendation Tracking System: - Commitment Tracking System; - Operating Experience (Sharing Lessons Learned) System. The paper will show all the above processes tie closely together and complement each other. The paper discusses the staff required for such processes and their training requirements. It recommends process time lines, reporting mechanisms, and sign off requirements. It will describe the equipment utilized to carry out this work effectively, and with a minimum of staff. One unique feature of the Bruce 'A' system is an 'Effectiveness Follow-Up', usually three to six months after the event recommendations have been completed. By rechecking the finished actions and reviewing them with the personnel involved with the originating event we ensure that the real root causes have been identified and resolved. (author)

  5. Life Science on the International Space Station Using the Next Generation of Cargo Vehicles

    Science.gov (United States)

    Robinson, J. A.; Phillion, J. P.; Hart, A. T.; Comella, J.; Edeen, M.; Ruttley, T. M.

    2011-01-01

    With the retirement of the Space Shuttle and the transition of the International Space Station (ISS) from assembly to full laboratory capabilities, the opportunity to perform life science research in space has increased dramatically, while the operational considerations associated with transportation of the experiments has changed dramatically. US researchers have allocations on the European Automated Transfer Vehicle (ATV) and Japanese H-II Transfer Vehicle (HTV). In addition, the International Space Station (ISS) Cargo Resupply Services (CRS) contract will provide consumables and payloads to and from the ISS via the unmanned SpaceX (offers launch and return capabilities) and Orbital (offers only launch capabilities) resupply vehicles. Early requirements drove the capabilities of the vehicle providers; however, many other engineering considerations affect the actual design and operations plans. To better enable the use of the International Space Station as a National Laboratory, ground and on-orbit facility development can augment the vehicle capabilities to better support needs for cell biology, animal research, and conditioned sample return. NASA Life scientists with experience launching research on the space shuttle can find the trades between the capabilities of the many different vehicles to be confusing. In this presentation we will summarize vehicle and associated ground processing capabilities as well as key concepts of operations for different types of life sciences research being launched in the cargo vehicles. We will provide the latest status of vehicle capabilities and support hardware and facilities development being made to enable the broadest implementation of life sciences research on the ISS.

  6. Rancho Seco Nuclear Generating Station, Unit 1. Annual report for 1976

    International Nuclear Information System (INIS)

    1977-03-01

    Net electrical energy generated was 2,205,091 MWH with the generator on line 2,662 hrs. Information is presented concerning operations, changes, tests, maintenance, fuel performance, refueling, shutdowns and outages, containment local leak rate testing, and power generation

  7. The Energy Cost Analysis of Hybrid Systems and Diesel Generators in Powering Selected Base Transceiver Station Locations in Nigeria

    Directory of Open Access Journals (Sweden)

    Peter Ozaveshe Oviroh

    2018-03-01

    Full Text Available As more locations gain access to telecommunication, there is a growing demand to provide energy in a reliable, efficient and environmentally friendly manner while effectively addressing growing energy needs. Erratic power supply and rising operation costs (OPEX in Nigeria have increased the need to harness local renewable energy sources. Thus, identifying the right generator schedule with the renewable system to reduce OPEX is a priority for operators and vendors. This study evaluates the energy costs of hybrid systems with different generator schedules in powering base transceiver stations in Nigeria using the Hybrid Optimization Model for Electric Renewable (HOMER. A load range of 4 kW to 8 kW was considered using: (i an optimised generator schedule; (ii forced-on generator schedule and (iii the generator-only schedule. The results showed an optimal LCOE range between averages of USD 0.156/kWh to 0.172/kWh for the 8 kW load. The percent energy contribution by generator ranges from 52.80% to 60.90%, and by the solar PV system, 39.10% to 47.20%. Excess energy ranges from 0.03% to 14.98%. The optimised generator schedule has the highest solar PV penetration of 56.8%. The OPEX savings on fuel ranges from 41.68% to 47% for the different load schedules and carbon emission savings of 4222 kg to 31,428.36 kg. The simulation results shows that powering base stations using the optimised hybrid system schedule would be a better option for the telecom industry.

  8. Obtaining college credit for licensed operator courses at the Wolf Creek Generating Station

    International Nuclear Information System (INIS)

    Russo, C.W.; Coulthard, R.C.

    1985-01-01

    The presentation examined alternatives to formal college courses as a means to obtain college credit toward a baccalaureate degree for station operations personnel. The focus is on the American Council on Education (ACE-PONSI) program which evaluates and makes credit recommendations for courses sponsored by organizations, like utilities, whose primary function is not education. Significant elements of the licensed operator program were prepared for an ACE-PONSI review and determined to be equivalent to college level nuclear engineering technology course work. The ACE-PONSI evaluation provides a good foundation and a significant amount of the training program evaluation required prior to the INPO accreditation effort

  9. Water-related constraints to the development of geothermal electric generating stations

    Science.gov (United States)

    Robertson, R. C.; Shepherd, A. D.; Rosemarin, C. S.; Mayfield, M. W.

    1981-06-01

    The water related constraints concerning geothermal energy are discussed. Three different constraints are: (1) water requirements of geothermal power stations; (2) resource characteristics of the most promising hydrothermal areas and regional and local water supply situations; and (3) legal issues confronting potential users of water at geothermal power plants in the states in which the resource areas are located. A total of 25 geothermal resource areas were studied. It is found that each had a hydrothermal resource temperature in excess of 150 C and an estimated 30 year potential of greater than 100-MW(e) capacity.

  10. Aging of nuclear station diesel generators: Evaluation of operating and expert experience: Workshop

    International Nuclear Information System (INIS)

    Hoopingarner, K.R.; Vause, J.W.

    1987-08-01

    Pacific Northwest Laboratory (PNL) evaluated operational and expert experience pertaining to the aging degradation of diesel generators in nuclear service. The research, sponsored by the US Nuclear Regulatory Commission (NRC), identified and characterized the contribution of aging to emergency diesel generator failures. This report, Volume II, reports the results of an industry-wide workshop held on May 28 and 29, 1986, to discuss the technical issues associated with aging of nuclear service emergency diesel generators. The technical issues discussed most extensively were: man/machine interfaces, component interfaces, thermal gradients of startup and cooldown and the need for an accurate industry database for trend analysis of the diesel generator system

  11. Aging of nuclear station diesel generators: Evaluation of operating and expert experience: Workshop

    Energy Technology Data Exchange (ETDEWEB)

    Hoopingarner, K.R.; Vause, J.W.

    1987-08-01

    Pacific Northwest Laboratory (PNL) evaluated operational and expert experience pertaining to the aging degradation of diesel generators in nuclear service. The research, sponsored by the US Nuclear Regulatory Commission (NRC), identified and characterized the contribution of aging to emergency diesel generator failures. This report, Volume II, reports the results of an industry-wide workshop held on May 28 and 29, 1986, to discuss the technical issues associated with aging of nuclear service emergency diesel generators. The technical issues discussed most extensively were: man/machine interfaces, component interfaces, thermal gradients of startup and cooldown and the need for an accurate industry database for trend analysis of the diesel generator system.

  12. Socio-economic impacts of nuclear generating stations: Surry case study

    International Nuclear Information System (INIS)

    Flynn, J.

    1982-07-01

    This report documents a case study of the socio-economic impacts of the construction and operation of the Surry nuclear power station. It is part of a major post-licensing study of the socio-economic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period 1980 to 1981. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study area during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of the construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socio-economic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  13. Socio-economic impacts of nuclear generating stations: D. C. Cook case study

    International Nuclear Information System (INIS)

    Branch, K.

    1982-07-01

    This report documents a case study of the socio-economic impacts of the construction and operation of the D. C. Cook nuclear power station. It is part of a major post-licensing study of the socio-economic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period 1980 to 1981. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study area during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socio-economic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  14. Socio-economic impacts of nuclear generating stations: Calvert Cliffs case study

    International Nuclear Information System (INIS)

    Flynn, J.

    1982-07-01

    This report documents a case study of the socio-economic impacts of the construction and operation of the Calvert Cliffs nuclear power station. It is part of a major post-licensing study of the socio-economic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period 1980 to 1981. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study area during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socio-economic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  15. Socio-economic impacts of nuclear generating stations: Diablo Canyon case study

    International Nuclear Information System (INIS)

    Pijawka, K.D.; Yaquinto, G.

    1982-07-01

    This report documents a case study of the socioeconomic impacts of the construction and operation of the Diablo Canyon nuclear power station. It is part of a major post-licensing study of the socioeconomic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period, 1980 to 1981. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study area during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socioeconomic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  16. Socio-economic impacts of nuclear generating stations: Three Mile Island case study

    International Nuclear Information System (INIS)

    Flynn, C.

    1982-07-01

    This report documents a case study of the socio-economic impacts of the construction and operation of the Three Mile Island nuclear power stations. It is part of a major post-licensing study of the socio-economic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period 1980 to 1981. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study area during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of the construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socio-economic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  17. Socio-economic impacts of nuclear generating stations: Rancho Seco case study

    International Nuclear Information System (INIS)

    Bergmann, P.A.

    1982-07-01

    This report documents a case study of the socio-economic impacts of the construction and operation of the Rancho Seco nuclear power station. It is part of a major post-licensing study of the socio-economic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period 1980 to 1981. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study area during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of the construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socio-economic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  18. Socio-economic impacts of nuclear generating stations: Oconee case study

    International Nuclear Information System (INIS)

    Flynn, J.

    1982-07-01

    This report documents a case study of the socio-economic impacts of the construction and operation of the Oconee nuclear power stations. It is part of a major post-licensing study of the socio-economic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period 1980 to 1981. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study area during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of the construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socio-economic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  19. Socio-economic impacts of nuclear generating stations: Peach Bottom case study

    International Nuclear Information System (INIS)

    Pijawka, K.D.

    1982-07-01

    This report documents a case study of the socio-economic impacts of the construction and operation of the Peach Bottom nuclear power station. It is part of a major post-licensing study of the socio-economic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period 1980 to 1981. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study area during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of the construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socio-economic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  20. Socio-economic impacts of nuclear generating stations: Nine Mile Point and Fitzpatrick case study

    International Nuclear Information System (INIS)

    Branch, K.; Cochran, R.; Meale, R.

    1982-07-01

    This report documents a case study of the socio-economic impacts of the construction and operation of the Nine Mile Point and Fitzpatrick nuclear power stations. It is part of a major post-licensing study of the socio-economic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period 1980 to 1981. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study area during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of the construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socio-economic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  1. Socio-economic impacts of nuclear generating stations: Crystal River Unit 3 case study

    International Nuclear Information System (INIS)

    Bergmann, P.A.

    1982-07-01

    This report documents a case study of the socio-economic impacts of the construction and operation of the Crystal River Unit 3 nuclear power station. It is part of a major post-licensing study of the socio-economic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period 1980 to 1981. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study area during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socio-economic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  2. Safety Evaluation Report related to the operation of Hope Creek Generating Station (Docket No. 50-354)

    International Nuclear Information System (INIS)

    1984-10-01

    The Safety Evaluation Report for the application filed by Public Service Electric and Gas Company, as applicant, for a license to operate the Hope Creek Generating Station (Docket No. 50-354), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Salem County, New Jersey. Subject to favorable resolution of the items discussed in this report, the NRC staff concludes that the facility can be operated by the applicant without endangering the health and safety of the public

  3. Effect of Hurricane Andrew on the Turkey Point Nuclear Generating Station from August 20--30, 1992. [Final report

    Energy Technology Data Exchange (ETDEWEB)

    Hebdon, F.J. [Institute of Nuclear Power Operations, Atlanta, GA (United States)

    1993-03-01

    On August 24, 1992, Hurricane Andrew, a Category 4 hurricane, struck the Turkey Point Electrical Generating Station with sustained winds of 145 mph (233 km/h). This is the report of the team that the US Nuclear Regulatory Commission (NRC) and the Institute of Nuclear Power Operations (INPO) jointly sponsored (1) to review the damage that the hurricane caused the nuclear units and the utility`s actions to prepare for the storm and recover from it, and (2) to compile lessons that might benefit other nuclear reactor facilities.

  4. Safety Evaluation Report related to the operation of Hope Creek Generating Station (Docket No. 50-354). Supplement No. 1

    International Nuclear Information System (INIS)

    1985-03-01

    Supplement No. 1 to the Safety Evaluation Report on the application filed by Public Service Electric and Gas Company as applicant for itself and Atlantic City Electric Company, as owners, for a license to operate Hope Creek Generating Station has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Lower Alloways Creek Township in Salem County, New Jersey. This supplement reports the status of certain items that had not been resolved at the time of publication of the Safety Evaluation Report

  5. Effect of Hurricane Andrew on the Turkey Point Nuclear Generating Station from August 20--30, 1992

    International Nuclear Information System (INIS)

    Hebdon, F.J.

    1993-03-01

    On August 24, 1992, Hurricane Andrew, a Category 4 hurricane, struck the Turkey Point Electrical Generating Station with sustained winds of 145 mph (233 km/h). This is the report of the team that the US Nuclear Regulatory Commission (NRC) and the Institute of Nuclear Power Operations (INPO) jointly sponsored (1) to review the damage that the hurricane caused the nuclear units and the utility's actions to prepare for the storm and recover from it, and (2) to compile lessons that might benefit other nuclear reactor facilities

  6. Safety evaluation report related to the operation of Hope Creek Generation Station (Docket No. 50-354). Supplement No. 5

    International Nuclear Information System (INIS)

    1986-04-01

    Supplement No. 5 to the Safety Evaluation Report on the application filed by Public Service Electric and Gas Company on its own behalf as co-owner and as agent for the other co-owner, the Atlantic City Electric Company, for a license to operate Hope Creek Generating Station has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Lower Alloways Creek Township in Salem County, New Jersey. This supplement reports the status of certain items that had not been resolved at the time of the publication of the Safety Evaluation Report

  7. Design and verification of computer-based reactor control system modification at Bruce-A candu nuclear generating station

    International Nuclear Information System (INIS)

    Basu, S.; Webb, N.

    1995-01-01

    The Reactor Control System at Bruce-A Nuclear Generating Station is going through some design modifications, which involve a rigorous design process including independent verification and validation. The design modification includes changes to the control logic, alarms and annunciation, hardware and software. The design (and verification) process includes design plan, design requirements, hardware and software specifications, hardware and software design, testing, technical review, safety evaluation, reliability analysis, failure mode and effect analysis, environmental qualification, seismic qualification, software quality assurance, system validation, documentation update, configuration management, and final acceptance. (7 figs.)

  8. Safety evaluation report related to the operation of Hope Creek Generating Station (Docket No. 50-354). Supplement 2

    International Nuclear Information System (INIS)

    1985-08-01

    Supplement No. 2 to the Safety Evaluation Report on the application filed by Public Service Electric and Gas Company as applicant for itself and Atlantic City Electric Company, as owners, for a license to operate Hope Creek Generating Station has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Lower Alloways Creek Township in Salem County, New Jersey. This supplement reports the status of certain items that had not been resolved at the time of publication of the Safety Evaluation Report

  9. Technical evaluation of RETS-required reports for Rancho Seco Nuclear Generating Station, Unit 1 for 1983

    International Nuclear Information System (INIS)

    Magleby, E.H.; Young, T.E.

    1985-01-01

    A review of the reports required by Federal regulations and the plant-specific Radiological Effluent Technical Specifications (RETS) for operations conducted during 1983 was performed. The periodic reports reviewed for the Rancho Seco Nuclear Generating Station, Unit 1 were the Semiannual Effluent Release Report, January 1, 1983 to June 30, 1983 and the Radiation Exposure, Environmental Protection, Effluent and Waste Disposal Report. The principal review guidelines were the plant's specific RETS which were based on NRC guidance given in NUREG-0133, ''Preparation of Radiological Effluent Technical Specifications for Nuclear Power Plants.'' The Licensee's submitted reports were found to be reasonably complete and consistent with the review guidelines

  10. Safety Evaluation Report related to the operation of Hope Creek Generating Station (Docket No. 50-354)

    International Nuclear Information System (INIS)

    1985-10-01

    Supplement No. 3 to the Safety Evaluation Report on the application filed by Public Service Electric and Gas Company on its own behalf as co-owner and as agent for the other co-owner, the Atlantic City Electric Company, for a license to operate Hope Creek Generating Station has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Lower Alloways Creek Township in Salem County, New Jersey. This supplement reports the status of certain items that had not been resolved at the time of publication of the Safety Evaluation Report. 6 tabs

  11. Water-related constraints to the development of geothermal electric generating stations

    Energy Technology Data Exchange (ETDEWEB)

    Robertson, R.C.; Shepherd, A.D.; Rosemarin, C.S.; Mayfield, M.W.

    1981-06-01

    The water-related constraints, which may be among the most complex and variable of the issues facing commercialization of geothermal energy, are discussed under three headings: (1) water requirements of geothermal power stations, (2) resource characteristics of the most promising hydrothermal areas and regional and local water supply situations, and (3) legal issues confronting potential users of water at geothermal power plants in the states in which the resource areas are located. A total of 25 geothermal resource areas in California, New Mexico, Oregon, Idaho, Utah, Hawaii, and Alaska were studied. Each had a hydrothermal resource temperature in excess of 150/sup 0/C (300/sup 0/F) and an estimated 30-year potential of greater than 100-MW(e) capacity.

  12. Formal on-the-job training programs at power generating stations

    Energy Technology Data Exchange (ETDEWEB)

    Hoch, R.R. [HGS, Inc., Ellicott City, MD (United States)

    1996-11-01

    On-the-Job Training (OJT) should be utilized for all posts in the stations. OJT for entry level positions should include training in many mundane areas that are often overlooked such as record keeping (log sheets and log books), proper communications and how to conduct himself or herself on the watch, during either emergency or routine situations. A separate OJT Program should be provided to prepare personnel to qualify for promotion to the next level. (Depending on any common agreements or bargaining unit contracts, OJT Programs can also be used to pre-qualify candidates for promotion to the next level.) By allowing the trainee to retain all OJT Program materials, it will also be available to him or her for continued reference or remedial training. (When an OJT Program is first instituted, it may be validated by issuing it to incumbent personnel and, subsequent, incorporating their comments or corrections.) This paper describes a formal OJT program.

  13. Aging of nuclear station diesel generators: Evaluation of operating and expert experience: Phase 1, Study

    Energy Technology Data Exchange (ETDEWEB)

    Hoopingarner, K.R.; Vause, J.W.; Dingee, D.A.; Nesbitt, J.F.

    1987-08-01

    Pacific Northwest Laboratory evaluated operational and expert experience pertaining to the aging degradation of diesel generators in nuclear service. The research, sponsored by the US Nuclear Regulatory Commission (NRC), identified and characterized the contribution of aging to emergency diesel generator failures. This report, Volume I, reviews diesel-generator experience to identify the systems and components most subject to aging degradation and isolates the major causes of failure that may affect future operational readiness. Evaluations show that as plants age, the percent of aging-related failures increases and failure modes change. A compilation is presented of recommended corrective actions for the failures identified. This study also includes a review of current, relevant industry programs, research, and standards. Volume II reports the results of an industry-wide workshop held on May 28 and 29, 1986 to discuss the technical issues associated with aging of nuclear service emergency diesel generators.

  14. Aging of nuclear station diesel generators: Evaluation of operating and expert experience: Phase 1, Study

    International Nuclear Information System (INIS)

    Hoopingarner, K.R.; Vause, J.W.; Dingee, D.A.; Nesbitt, J.F.

    1987-08-01

    Pacific Northwest Laboratory evaluated operational and expert experience pertaining to the aging degradation of diesel generators in nuclear service. The research, sponsored by the US Nuclear Regulatory Commission (NRC), identified and characterized the contribution of aging to emergency diesel generator failures. This report, Volume I, reviews diesel-generator experience to identify the systems and components most subject to aging degradation and isolates the major causes of failure that may affect future operational readiness. Evaluations show that as plants age, the percent of aging-related failures increases and failure modes change. A compilation is presented of recommended corrective actions for the failures identified. This study also includes a review of current, relevant industry programs, research, and standards. Volume II reports the results of an industry-wide workshop held on May 28 and 29, 1986 to discuss the technical issues associated with aging of nuclear service emergency diesel generators

  15. Analysis of the efficiency and effectiveness of distributed generation in the power station (fuel) Sancti Spiritus

    International Nuclear Information System (INIS)

    Castro Álvarez, Alfredo; Pérez Pérez, Osvaldo; Bravo Amarante, Edelvy

    2015-01-01

    The severe crisis in the National Electric System (SEN) suffered by Cuba in the late 90's and early 2000 forced to change the design to keep the generation matrix supported in large plants towards where distributed generation small plants throughout the country, the state assumed demand and residential sector. From tools frequently used to evaluate the quality of processes (Scatter diagram, Pareto diagram, Ishikawa diagram and function quality loss Taguchi) was evaluated from indicators index fuel consumption and availability, efficiency and effectiveness of the generation process identifying areas within the plant that the greatest impact on the deviation of both indicators and the impact generated in the services, the economy and the environment. To develop this evaluation the operating data of the years 2012, 2013 and 2014 of the power plant were taken Sancti Spiritus. (full text)

  16. Combinatorics of tenth-order mock theta functions

    Indian Academy of Sciences (India)

    In this paper, we provide the combinatorial interpretations of two tenth order mock theta functions which appeared in some identities given in Ramanujan's lost notebook ((1988) Narosa Publishing House, New Delhi). Author Affiliations. J K SAREEN M RANA. Dates. Manuscript received: 2 May 2014; Manuscript revised: 16 ...

  17. Stakeholder participation in investigating the health impacts from coal-fired power generating stations in Alberta, Canada

    Energy Technology Data Exchange (ETDEWEB)

    Jardine, C.G.; Predy, G.; Mackenzie, A. [University of Alberta, Edmonton, AB (Canada)

    2007-07-01

    Developing an effective stakeholder participation process and communication dialogue continues to be a challenge in dealing with risk issues, particularly those in which the risk is uncertain and people are fearful about the potential impacts. The complex public stakeholder relations and risk communication issues associated with investigating the potential human health effects associated with exposure to the emissions of coal-fired power generating stations are discussed. Residents in the area around Lake Wabamun (west of Edmonton, Alberta, Canada) have raised concerns about potential health impacts from four nearby coal-fired power generating stations. The Wabamun and Area Community Exposure and Health Effects Assessment Programme (WACEHEAP) was developed to look specifically at what people are being exposed to in this area as well as some of the health effects from these exposures. Public stakeholders to this process included the general public, community interest groups and the Paul First Nation. Two surveys were conducted to better understand community concerns, communication and information needs, and desire for involvement. Consultations were also held with the Paul First Nation. The results provided important insights into the risk perspectives of these groups, including communication needs and desired means of participating in the risk assessment process.

  18. Assessment of whether upstream passage for Lake Sturgeon is needed at the Pointe du Bois Generating Station (Winnipeg River)

    International Nuclear Information System (INIS)

    Pratt, T.

    2010-01-01

    This document reviewed Manitoba Hydro's proposal to modernize the Pointe du Bois Generating Station (GS) on the Winnipeg River, with particular reference to the potential impacts on Lake Sturgeon in Management Unit 5 (MU5) where large numbers of the fish spawn at the base of the falls. The modernization will involve replacing the spillway, dam segments and replacing or repairing the powerhouse. The pros and cons of providing upstream fish passage for Lake Sturgeon and the generating station were outlined. The only spawning area in the MU5 area may be altered considerably due to changes in water flow, depending on the design chosen for modernization. A potential benefit of providing upstream fish passage for Lake Sturgeon would be to increase genetic diversity within the Winnipeg River. Another potential benefit would be to allow Lake Sturgeon, from the relatively dense population below the GS, to move upstream into MU4 where unfilled habitat may be available and Lake Sturgeon abundance is lower. A potential disadvantage of providing fish passage would be the loss of individual Lake Sturgeon from the healthy population in MU5 with no accompanying benefit to MU4. There would be no net gain to MU4 or MU5 if migrating Lake Sturgeon returned to MU5 rather than proceeding upstream. It was concluded that these current gaps in knowledge must be filled in order to fully assess the environmental impacts. 2 figs.

  19. The feature of emergency diesel generator relaying protection in Tianwan nuclear power station

    International Nuclear Information System (INIS)

    Jiang Xiaopeng; Shi Yan; Li Cong

    2014-01-01

    This paper mainly introduces the function and feature of emergency diesel generator in nuclear power plant, which plays an important role in nuclear accident. It minutely tells about the feature and configuration of relay protection and discusses the rationality of protection scheme, which shows that it can be completely contented all kinds of operation states. It is an analysis and argument about the principle of relay protection in detail, that would operate correctly when emergency diesel generator be in abnormal operating and serious fault conditions, such as cut off emergency diesel generator in order to avoid more harm to emergency diesel generator. It analyzes how the relay responses quickly and locks up the protection action under perturbations in the external power, so it can avoid unnecessary resection of emergency diesel generator to emergency power supply loss and effect of nuclear safety. It also analyzes the flexible use of protection setting of the protective relay to meet various operating status. It elaborates the particularity of relay protection which is due to the particularity of nuclear safety. It analyses the possibility of relay protection which has to be applied to other equipment and the protection setting that was provided by design institute, and puts forward the author's viewpoints. (authors)

  20. Investigations of the gas-side heat transfer and flow characteristics of steam generators in AGR stations

    International Nuclear Information System (INIS)

    Lis, J.

    1984-01-01

    This paper describes the experimental and analytical investigations of the gas-side heat transfer and flow characteristics of steam generators in the AGR stations carried out by CERL. The majority of the experimental work on heat transfer and flow characteristics of close-packed tube arrangements in cross-flow of gases is carried out in a pressurised heat exchanger rig. The rig is operated on-line by a dedicated PDP 11/40 computer over the range of Reynolds number 10 4 to 3x10 5 . Atmospheric wind tunnels employing either small or large scale models of the specific sections of steam generators are used for a variety of supplementary and development studies. Various measurements techniques and, in particular, LDA and hot wire anemometry employed in these studies are described. The more important aspects of various investigations are illustrated by typical results. In order to ensure the efficient operation and integrity of steam generators under asymmetric boundary conditions a MIX suite of 2-dimensional codes has been developed. The codes calculate the gas and water/steam flow and temperature distributions in each channel of the steam generator taking into account thermal mixing in the gas as it passes through the generator. Application of the MIX codes to the solution of various operational problems is illustrated by typical examples and the continuing exercise of validating the codes against plant operational data is discussed. (author)

  1. Evaluation of Electrochemically Generated Potable Water Disinfectants for Use on the International Space Station

    Science.gov (United States)

    Rodriquez, Branelle; Anderson, Molly; Adams, Niklas; Vega, Leticia; Botkin, Douglas

    2013-01-01

    Microbial contamination and subsequent growth in spacecraft water systems are constant concerns for missions involving human crews. The current potable water disinfectant for the International Space Station (ISS) is iodine; however, with the end of the Space Shuttle Program, there is a need to develop redundant biocide systems that do not require regular up-mass dependencies. Throughout the course of a year, four different electrochemical systems were investigated as a possible biocide for potable water on the ISS. Research has indicated that a wide variability exists with regards to efficacy in both concentration and exposure time of these disinfectants; therefore, baseline efficacy values were established. This paper describes a series of tests performed to establish optimal concentrations and exposure times for four disinfectants against single and mixed species planktonic and biofilm bacteria. Results of the testing determined whether these electrochemical disinfection systems are able to produce a sufficient amount of chemical in both concentration and volume to act as a biocide for potable water on the ISS.

  2. TOC removal from make-up water at Millstone Nuclear Generating Station

    International Nuclear Information System (INIS)

    Miller, W.S.; Jones, V.W.; Langer, R.H.

    1986-01-01

    Through the use of mobile service companies, Northeast Utilities was able to evaluate various unit operations to determine the most effective method for improving make-up water chemistry. Because the tests were conducted on a full scale basis, the total impact on system chemistry was easily obtained. Since all systems were leased, no capital expenditures were required. Also, the leasing of fully piped, self-contained, quality control tested equipment allows start-ups to begin within hours of arrival on-site. For this particular water supply, the application of reverse osmosis technology appears to be optimum. To date, for Millstone Station, it is the only technology which has produced less than 50 ppb TOC make-up water quality. This has led to significant secondary system chemistry improvements. For other source water supplies, R.O. may not be the best or only approach. Indeed, there are many ion exchange and flash evaporator installations which are producing water of low TOC content. Having the marketplace option of leasing full scale equipment to evaluate if other processes can further improve water quality is an attractive alternative to small scale pilot studies

  3. Steam generator materials and secondary side water chemistry in nuclear power stations

    International Nuclear Information System (INIS)

    Rudelli, M.D.

    1979-04-01

    The main purpose of this work is to summarize the European and North American experiences regarding the materials used for the construction of the steam generators and their relative corrosion resistance considering the water chemestry control method. Reasons underlying decision for the adoption of Incoloy 800 as the material for the secondary steam generator system for Atucha I Nuclear Power Plant (Atucha Reactor) and Embalse de Rio III Nuclear Power Plant (Cordoba Reactor) are pointed out. Backup information taken into consideration for the decision of utilizing the All Volatil Treatment for the water chemistry control of the Cordoba Reactor is detailed. Also all the reasonswhich justify to continue with the congruent fosfatic method for the Atucha Reactor are analyzed. Some investigation objectives which would eventually permit the revision of the decisions taken on these subjects are proposed. (E.A.C.) [es

  4. Palo Verde Generating Station, Units 4 and 5. License application, general information

    International Nuclear Information System (INIS)

    1978-01-01

    A license application for two more Palo Verde reactors, Units 4 and 5, is presented. The two PWR reactors have a nominal net generating power each of 1,270 MW(e). Containments are steel-lined prestressed cylindrical structures with hemispherical domes. The reactors are replicas of Palo Verde 1, 2 and 3 (see DOCKETS 50528, 50529 and 50530) using the standard Combustion Engineering System 80 (see DOCKET-STN-50470)

  5. Projected costs of generating electricity from power stations for commissioning in the period 1995-2000

    International Nuclear Information System (INIS)

    1989-01-01

    The study reviews the projected electricity generation costs for the base load power generation options expected to be available in the medium term, using an agreed common economic methodology. Cost projections were obtained for nuclear and fossil fuelled plants that could in principle be commissioned in the mid-1990s, or shortly thereafter, although not all countries plan to commission plants at that time. The major changes in expectations compared with earlier studies, apart from those associated with changed perceptions of fossil fuel prices, include significantly lower nuclear investment costs for the United States, associated with an improved design and the expectation of achieving shorter construction periods than projected in the 1985 study, and generally lower nuclear fuel costs. Some countries project higher operation and maintenance costs for either coal-fired or nuclear plant or both. In the case of coal-fired plants these may be associated with the extra costs of operating desulphurisation equipment. The most marked change in nuclear operating and maintenance costs has taken place in the United States, where these costs are now expected to be twice as large as the projected nuclear fuel costs. There remain major differences in investment cost expectations between countries. The reasons for these differences have been examined in previous studies. They arise from differences in factor costs, regulatory approach, design and siting, and exchange rates which do not adequately reflect the differences in the capital investment costs between countries. In brief, most OECD countries continue to expect nuclear power to have a lower levelised generating cost than coal-fired generation when using their own technical and economic assumptions

  6. Marble Hill Nuclear Generating Station, Units 1 and 2. License application, PSAR, general information

    International Nuclear Information System (INIS)

    1975-01-01

    An application is presented for two PWR reactors to be constructed in Salud Township, Jefferson County, Indiana, about six miles northeast of New Washington on the Ohio River. Each unit will have a rated core power level of 3411 MW(t) with a corresponding electrical output of 1130 MW(e). Mechanical draft cooling towers will be provided. The facility, which will replicate the Byron facility will be employed for the generation of electricity for transmission, sale for resale, and distribution

  7. Fulton Generating Station Units 1 and 2 (Docket Nos. 50-463 and 50-464): Final environmental statement

    International Nuclear Information System (INIS)

    1975-04-01

    The proposed action is the issuance of construction permits to the Philadelphia Electric Company for the construction of the Fulton Generating Station, Units 1 and 2, located in Fulton and Drumore Townships, Lancaster County, Pennsylvania. Makeup water for cooling will be withdrawn form Conowingo Pond at a maximum rate of 43,000 gpm. The dissolved solids content of the blowdown water will be increased by a factor of about two. The remainder of the water will be evaporated to the atmosphere by cooling towers. About 10 acres offsite, some 7 acres of which is woodland, will be used for railroad-spur construction. About 0.25 mile of new transmission-line rights-of-way (9 acres) will be needed, although 49 miles of new transmission line, which will require about 3 miles of selective clearing, will be constructed on existing rights-of-way. An unestablished amount of land will be used for access-road construction, but the applicant will use existing roadway corridors where feasible. A small loss of consumer species will result from loss of habitat. Some loss of benthic and pelagic organisms in Conowingo Pond will be caused by intake and discharge construction. The Station's thermal and chemical discharges will meet the State water-quality standards. The duration of additional ground-level fog caused by Station operation is expected to be less than 3 hr/year. (Sect. 5.3.3). No observable effects are expected from salt deposition from cooling-tower drift. (Sect. 5.3.3). Decomposers, primary producers, and zooplankton will be entrained and killed in the cooling-tower system; they, as well as benthic organisms, will be affected by the heated-water discharge. This loss will have little effect on the pond food web. 30 figs., 76 tabs

  8. Higher Efficiency and Temperature Reliability of Steam Generators at Thermal Power Stations

    Directory of Open Access Journals (Sweden)

    R. F. Kelbaliev

    2010-01-01

    Full Text Available Methods for higher power unit efficiency and decrease of specific fuel consumption for electric-power generation have been considered in the paper. The paper reveals that a heat exchange intensification makes a positive effect on efficiency and temperature reliability of power engineering equipment while using coil and artificially turbulized (contoured pipes. Results of experimental investigations on metal temperature at various mode parameters are proposed in the paper. The paper contains equations for determination of conditions initiating heat-transfer drop.

  9. EMI environment EMC considerations concerning equipment upgrades at a nuclear utility power generating station a case history

    International Nuclear Information System (INIS)

    Metcalf, M.J.

    1993-01-01

    As equipment is upgraded during scheduled power outages in nuclear power generating stations, more and more utilities will be faced with the problem of dealing with Electromagnetic Compatibility (EMC) issues that have evolved with the trend of manufacturers designing equipment based around state-of-the-art high technology logic devices. This paper lists Commonwealth Edison Company (CECO) equipment that was scrutinized by National Technical Systems (NTS) for its EMI impact. The test requirements and test procedures for assessing EMI and EMC are outlined. Although on-site mapping data was gathered to assist CECO for the upgrade described here of the Auxiliary Electric Equipment Room of a Westinghouse Eagle 21 Reactor Protection System at the Zion Unit No.1 Station, blanket mapping of every location for every upgrade is a short term, expensive solution to the EMI problem. It is concluded that the primary problem of lack of system and component level EMI specifications must be addressed by a governing body. 7 refs., 2 figs

  10. Seismic structural fragility investigation for the San Onofre Nuclear Generating Station, Unit 1 (Project I); SONGS-1 AFWS Project

    International Nuclear Information System (INIS)

    Wesley, D.A.; Hashimoto, P.S.

    1982-04-01

    An evaluation of the seismic capacities of several of the San Onofre Nuclear Generating Station, Unit 1 (SONGS-1) structures was conducted to determine input to the overall probabilistic methodology developed by Lawrence Livermore National Laboratory. Seismic structural fragilities to be used as input consist of median seismic capacities and their variabilities due to randomness and uncertainty. Potential failure modes were identified for each of the SONGS-1 structures included in this study by establishing the seismic load-paths and comparing expected load distributions to available capacities for the elements of each load-path. Particular attention was given to possible weak links and details. The more likely failure modes were screened for more detailed investigation

  11. An aerial radiological survey of the South Texas Project Electric Generating Station and surrounding area, Bay City, Texas

    International Nuclear Information System (INIS)

    Thompson, J.M.

    1988-12-01

    An aerial radiological survey was conducted over the South Texas Project Electric Generating Station (STPEGS) near Bay City, Texas, during the period 25 March to 4 April 1988. The purpose of the 259-square-kilometer (100-square-mile) survey was to document the terrestrial gamma environment of the plant and surrounding area. An exposure rate contour map at 1 meter above ground level (AGL) was constructed from the gamma data and overlaid on an aerial photograph and map of the area. Exposure rates were observed up to 10μR/h over land. No areas of enhanced exposure rates were observed. Ground-based exposure rate measurements and soil samples were obtained to support the aerial data. Oblique aerial photographs of the plant were also acquired during the survey. 9 refs., 4 figs., 1 tab

  12. Floating nuclear power station of APWS-80 type for electricity generation and fresh water production

    International Nuclear Information System (INIS)

    Zverev, K.V.; Polunichev, V.I.; Sergeev, Yu.A.

    1997-01-01

    To solve the problem of seawater desalination and electric energy generation, the designing organizations of Russia have developed two variants of floating nuclear desalination plant. The KLT-40 type reactors, with maximum 160 MW thermal power, is used as the power source for such plant. Depending on the customer requirement one or two power unit could be installed in the floating desalination plant. There are APWS-80 with two reactors, producing 80,000 m 3 desalinated water per day and APWS-40 with one reactor, producing 40,000 m 3 desalinated water per day. The advantages of floating desalination plants are the possibility to build and test them at the ship-build plant of the supplier country and to hand them over on turnkey base. (author). 5 figs

  13. Projected costs of generating electricity from nuclear and coal-fired power stations for commissioning in 1995

    International Nuclear Information System (INIS)

    1986-01-01

    This report updates and extends the previous NEA study, ''The Costs of Generating Electricity in Nuclear and Coal-fired Power Stations'', published by the OECD in late 1983. Despite the changed expectations concerning coal prices and the considerable movements in exchange rates since the first study was completed, the conclusions remain essentially the same. Nuclear Power is projected to be economically superior by a significant margin to coal-fired plants for base load electricity production in Europe, Japan and some regions of North America. In areas of North America in close proximity to supplies of cheap coal, this would be the more economic fuel, unless future nuclear investment costs can be reduced to match the best US and Canadian experience. In all regions considered, the economic advantage of both coal and nuclear over oil and gas-fired plants for commissioning in the mid-1990s is expected to be substantial. These conclusions are based on an analysis of cost projections for 900 MWe to 1400 MWe Light Water Reactors to be commissioned in 1995, operating at a levelised load factor of about 72 per cent over an assumed 25 years economic life and calculated with a 5 per cent (real) discount rate. This parallels the reference reactor selected for the NEA report ''The Economics of the Nuclear Fuel Cycle'', which was published by the OECD in June 1985, though it deviates somewhat from the reference conditions of the previous generation cost study. Contemporary coal-fired stations ranging in capacity from 330 MWe to 700 MWe with the same assumed economic life and load factor provide the basis for comparison. Some data are included on CANDU Pressurised Heavy Water Reactors, and a brief comment is annexed on the relevance of the comparisons for the smaller plants that may be of interest to countries with smaller electricity networks or where special circumstances apply

  14. Severe accident analysis of a steam generator tube rupture accident using MAAP-CANDU to support level 2 PSA for the Point Lepreau Generating Station Refurbishment Project

    Energy Technology Data Exchange (ETDEWEB)

    Petoukhov, S.M.; Brown, M.J. [Canadian Nuclear Laboratories, Chalk River, ON (Canada)

    2015-07-01

    A Level 2 Probabilistic Safety Assessment was performed for the Point Lepreau Generating Station. The MAAP-CANDU code was used to simulate the progression of postulated severe core damage accidents and fission product releases. This paper discusses the results for the reference case of the Steam Generator Tube Rupture initiating event. The reference case, dictated by the Level 2 Probabilistic Safety Assessment, was extreme and assumed most safety-related plant systems were not available: all steam generator feedwater; the emergency water supply; the moderator, shield and shutdown cooling systems; and all stages of emergency core cooling. The reference case also did not credit any post Fukushima lessons or any emergency mitigating equipment. The reference simulation predicted severe core damage beginning at 3.7 h, containment failure at 6.4 h, moderator boil off by 8.2 h, and calandria vessel failure at 42 h. A total release of 5.3% of the initial inventory of radioactive isotopes of Cs, Rb and I was predicted by the end of the simulation (139 h). Almost all noble gas fission products were released to the environment, primarily after the containment failure. No hydrogen/carbon monoxide burning was predicted. (author)

  15. Assessment of the once-through cooling alternative for central steam-electric generating stations

    International Nuclear Information System (INIS)

    Paddock, R.A.; Ditmars, J.D.

    1978-12-01

    The efficacy of the disposal of waste heat from steam-electric power generation by means of once-through cooling systems was examined in the context of the physical aspects of water quality standards and guidelines for thermal discharges. Typical thermal standards for each of the four classes of water bodies (rivers, lakes, estuaries, and coastal waters) were identified. The mixing and dilution characteristics of various discharge modes ranging from simple, shoreline surface discharges to long, submerged multiport diffusers were examined in terms of the results of prototype measurements, analytical model predictions, and physical model studies. General guidelines were produced that indicate, for a given plant capacity, a given type of receiving water body, and a given discharge mode, the likelihood that once-through cooling can be effected within the restrictions of typical thermal standards. In general, it was found that shoreline surface discharges would not be adequate for large power plants (greater than or equal to 500 MW) at estuarine and marine coastal sites, would be marginally adequate at lake sites, and would be acceptable only at river sites with large currents and river discharges. Submerged multiport diffusers were found to provide the greatest likelihood of meeting thermal standards in all receiving water environments

  16. The Burrard utilization study report: Review and analysis of the future role of Burrard Thermal Generating Station

    International Nuclear Information System (INIS)

    1993-01-01

    The Burrard Thermal Generating Station is located at Port Moody, British Columbia, and burns natural gas to supply steam to six turbine units for generating up to 912 MW of electricity. The Burrard plant accounts for ca 8.7% of the provincial generating capability. Burrard is expected to continue to fill a vital role as a supplier of displaceable firm energy to the British Columbia Hydro system. In parallel with a renewed focus on Burrard from a system planning perspective, there have also been concerns about air pollution from the plant in the context of its possible effect on the region's air quality. To address this and other issues surrounding Burrard's future, B.C. Hydro established a project team to conduct a utilization study. The team's work focused on the role of Burrard in providing a reliable and profitable role in electricity generation, the options for dealing with the air quality issue, and the implications of choosing one option over another. The team examined a wide range of issues including the remaining useful productive life of the plant, air quality, emissions reduction technologies, long-term gas prices and availability, and seismic stability of the plant. Key findings and recommendations of the study team are reviewed. A financial analysis showed that operating the plant in the displaceable firm energy mode is clearly superior to shutting the plant down and $100 million superior to operation in the full baseload mode. Selective catalytic reduction technology applied to at least the first four of the plant units is the favored option for ensuring better air quality. The value of Burrard would be increased further if its availability factor could be increased to 85%. 7 figs., 3 tabs

  17. Aerial radiological survey of the Palo Verde Nuclear Generating Station and surrounding area, Wintersburg, Arizona. Date of survey: November 1982

    International Nuclear Information System (INIS)

    Semmler, R.A.

    1984-01-01

    An aerial survey of terrestrial gamma radiation was performed during the period 4 November through 15 November 1982 over a 16-kilometer by 16-kilometer (10-mile by 10-mile) area approximately centered on the Palo Verde Nuclear Generating Station near Wintersburg, Arizona. Gamma radiation spectral data were collected while flying a helicopter over a regular pattern of parallel lines spaced 150 meters (500 feet) apart at an altitude of 90 meters (300 feet). All radiation measurements taken at the nominal flight altitude were corrected for altitude variations, cosmic radiation, and helicopter background to generate exposure rates from terrestrial sources extrapolated to 1 meter above ground level. The data are presented as isoradiation contour maps. The average terrestrial radiation levels fall between 8 and 14 microrentgens per hour (μR/h). All gamma radiation detected within the survey area was associated with naturally occurring radionuclides. Direct ground-based measurements at 1 meter height were also taken at four scattered sites within the survey area. These values agree with the contour intervals determined from the aerial measurements and differ from the mean value of adjacent contours by no more than 10%. 6 references, 5 figures, 2 tables

  18. IEEE Std 383-1974: IEEE standard for type test of Class IE electric cables, field splices, and connections for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This standard provides direction for establishing type tests which may be used in qualifying Class 1E electric cables, field splices, and other connections for service in nuclear power generating stations. General guidelines for qualifications are given in IEEE Std 323-1974, Standard for Qualifying Class IE Electric Equipment for Nuclear Power Generating Stations. Categories of cables covered are those used for power control and instrumentation services. Though intended primarily to pertain to cable for field installation, this guide may also be used for the qualification of internal wiring of manufactured devices. This guide does not cover cables for service within the reactor vessel

  19. Proposed Darlington generating station

    International Nuclear Information System (INIS)

    1975-05-01

    The proposed Darlington GS A project, consisting of four 850 MW CANDU-type reactors, is described. Construction and operation will cause environmental changes with regard to air, water, aquatic life, the site area, safety and noise, and the predicted changes are described. (E.C.B.)

  20. The tenth Arab conference on peaceful uses of atomic energy

    International Nuclear Information System (INIS)

    2010-01-01

    This conference includes the paper presented at the tenth Arab conference of the peaceful uses of Nuclear Atomic Energy that is organized by AAEA (Arab Atomic Energy Agency) in cooperation with Iraqi Ministry of Science and Technology and Kurdistan government , held in Erbil (Iraq) from 12-16 December 2010. This conference consists of three volumes covering the following concepts: Analysis and Material Improvement, Soil fertility, Water Recourse Management, Nuclear Medicine and Biological Irradiation, Isotopes Production, Improvement of Plant and Animal Production, Decommissioning and Dismantling of Nuclear Facilities, Radioactive Waste Management, Nuclear Safety and Security of Radiation Protection, Pest Control and Food Irradiation Processing

  1. A Social History of the Tenth Cavalry, 1931-1941

    Science.gov (United States)

    1976-06-11

    The Indians were well positioned in gorges and concentrated heavy fire on the troops. In the course of the 1 I battle Corporal Winfield Scott was...days after the bandits’ departure. On 31 March, the Tenth =. / 19 did make contact with Villa’s forces at Aguas Calientes, but their tired horses could...Sergeant John P. Walker, Troop E, 10th Cay 1st Lieutenant Sergeant Floyd Gilmer, Troop A, 10th Cay 1st Lieutenant Corporal Waddell C. Steele, Troop E

  2. Heat-shrinkable splicing materials for Class 1E wire and cable systems in nuclear power generating stations

    International Nuclear Information System (INIS)

    Handa, Katsue; Maruyama, Masahiro; Kanno, Mikio; Ohya, Shingo; Nagakawa, Seiji; Sugimori, Mikihiro

    1987-01-01

    This report describes the shapes of heat-shrinkable splicing materials (cable sleeve and breakout, and round end cap) made of polyolefine resin, their application to cable splicing, and the properties of the materials as well as of the splice using them. Particularly, the report features introduction of their properties as determined by tests under the same conditions as used in Japan in qualifying tests on wires and cables for nuclear power generating stations. The heat-shrinkable splicing materials proved to be equal in properties to flame-retardant cables for nuclear power plants when tested for oxygen index and subjected to a vertical flame test on ''insulated wire'' and a vertical tray flame test on the cable splice. It was also confirmed that Class 1E cable using these splicing materials could stand the most rigorous environmental test in Japan. Therefore they can be used for splicing Class 1E wires and cables and the splice formed with them can be regarded as Class 1E specified in IEEE Std. 383. (author)

  3. Measurements of atmospherically dispersed tritium and 14C in the vicinity of the Point Lepreau Generating Station

    International Nuclear Information System (INIS)

    Levels of 14 C and tritium have been measured in environmental samples collected in the environs of the Pt. Lepreau Generating Station over a two day period in September, 1997. Overall, the specific activity of 14 C in all samples was low, with only the samples taken close to the reactor, and/or in the principal wind direction, containing levels statistically higher than global background values (∼250 Bq.kg -1 at St. Andrews, 50 km from the site). The highest level measured was 342 Bq.kg -1 , or 151 pMC (percent modern carbon). Tissue free water tritium (TFWT) levels in vegetation samples varied from 8775 TU immediately adjacent to the reactor building to as low as 300 TU within two kilometres of the reactor (1 TU - 0.1184 Bq.L -1 ). Regional background levels of tritium in precipitation were estimated to be on the order of 30 TU, based on the TFWT levels in vegetation samples collected near St. Andrews, N.B. Based on the radiocarbon and tritium levels in the vegetation, atmospheric dispersion factors (K a ) for 14 C and 3 H are on the order of approximately 5 x 10 -7 to 1 x 10 -6 s.m -3 at distances of 1 km from the reactor. (author)

  4. Long term performance of a slurry trench cut-off wall at Butnau Dam, Kettle Generating Station, Manitoba

    International Nuclear Information System (INIS)

    Halim, R.; Smith, N.J.; Gupta, R.C.; Osiowy, B.J.

    1998-01-01

    A 185 m long, 1.8 m wide slurry trench cut-off wall was constructed in 1971 through a portion of Manitoba Hydro's Butnau Dam located on the Nelson River in northern Manitoba. The performance of the dam has since been monitored as part of the maintenance and operation of the Kettle Generating Station. Piezometers, thermocouples, settlement gauges, marker pins and automated weir flow measurement systems were installed to monitor and ensure the safety of the dam, but none of the monitoring was related to the slurry trench cut-off wall which is now 26 years old. Recently, a review of the performance of the wall was conducted because of the severe climate in northern Manitoba and because of the lack of well documented performance histories for structures of this type. The review included contacts and discussions with experts and companies dealing with the construction of slurry trench cut-off walls in North America, and a literature search on the performance of similar walls. It was concluded that neither the review of the literature nor the instrumented and visual observations of the dam in the vicinity of the of the cut-off wall revealed any unusual readings or conditions that would warrant concern for the safety and performance of the dam. 7 refs., 4 figs

  5. Experience in ultrasonic gap measurement between calandria tubes and liquid injection shutdown systems nozzles in Bruce Nuclear Generating Station

    International Nuclear Information System (INIS)

    Abucay, R.C.; Mahil, K.S.; Goszczynski, J.J.

    1995-01-01

    The gaps between calandria tubes (CT) and Liquid Injection Shutdown System (LISS) nozzles at the Bruce Nuclear Generating Station ''A'' (Bruce A) are known to decrease with time due to radiation induced creep/sag of the calandria tubes. If this gap decreases to a point where the calandria tubes come into contact with the LISS nozzle, the calandria tubes could fail as a result of fretting damage. Proximity measurements were needed to verify the analytical models and ensure that CT/LISS nozzle contact does not occur earlier than predicted. The technique used was originally developed at Ontario Hydro Technologies (formerly Ontario Hydro Research Division) in the late seventies and put into practical use by Research and Productivity Council (RPC) of New Brunswick, who carried out similar measurements at Point Lepreau NGS in 1989 and 1991. The gap measurement was accomplished y inserting an inspection probe, containing four ultrasonic transducers (2 to measure gaps and 2 to check for probe tilt) and a Fredericks electrolytic potentiometer as a probe rotational sensor, inside LISS Nozzle number-sign 7. The ultrasonic measurements were fed to a system computer that was programmed to convert the readings into fully compensated gaps, taking into account moderator heavy water temperature and probe tilt. Since the measured gaps were found to be generally larger than predicted, the time to CT/LISS nozzle contact is now being re-evaluated and the planned LISS nozzle replacement will likely be deferred, resulting in considerable savings

  6. Application of ecological risk assessment to establish nonhuman environmental protection at nuclear generating stations in Ontario, Canada

    International Nuclear Information System (INIS)

    Wismer, D.A.

    2004-01-01

    A screening ecological risk assessment was performed for regulatory compliance at three Ontario nuclear generating station sites to establish design requirements for a routine contaminant monitoring program and to address the need for non-contaminant stressor management. Site specific assessments went beyond traditional contaminant risk assessment to include stressors associated with land-use change, cooling water systems and site storm water runoff. Valued terrestrial and aquatic ecosystem components were selected from species lists after stakeholder consultation, and contaminants of concern were selected based on their relative loadings, and with respect to regulatory and literature-based benchmarks. Predictive modeling was used to estimate chemical and radionuclide exposures and likelihood of effects. Adverse effects on individual biota were predicted for aqueous emissions of chlorine and storm water but not for radionuclides. Retrospective analyses of past field monitoring were used to determine likelihood of effects from non-contaminant stressors. Individual-level adverse effects were observed for fish losses from cooling water withdrawal. Depending on the site and the biological species, either beneficial or adverse effects from thermal discharge and land-use change were observed. Followup studies include monitoring, laboratory study, computer modeling and mitigation. Field monitoring will generate more precise species-level estimates of intake fish losses, magnitude of fish response to thermal discharge and chlorine concentrations in near-field discharge waters. Laboratory study is determining the effectiveness of intake fish loss mitigation technology. Computer fish population models are being used to design field studies and interpret individual level effects. Mitigation includes storm water controls and habitat biodiversity management projects to offset past losses from site development and construction. Routine contaminant monitoring is planned to

  7. Socioeconomic impacts of nuclear generating stations: Arkansas Nuclear One station case study. Technical report 1 Oct 78-4 Jan 82

    International Nuclear Information System (INIS)

    Pijawka, K.D.

    1982-07-01

    The report documents a case study of the socioeconomic impacts of the construction and operation of the Arkansas Nuclear One nuclear power station. It is part of a major post-licensing study of the socioeconomic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period, 1980-81. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study area during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socioeconomic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  8. Weather Radar Stations

    Data.gov (United States)

    Department of Homeland Security — These data represent Next-Generation Radar (NEXRAD) and Terminal Doppler Weather Radar (TDWR) weather radar stations within the US. The NEXRAD radar stations are...

  9. Estimating cancer risk in relation to tritium exposure from routine operation of a nuclear-generating station in Pickering, Ontario.

    Science.gov (United States)

    Wanigaratne, S; Holowaty, E; Jiang, H; Norwood, T A; Pietrusiak, M A; Brown, P

    2013-09-01

    Evidence suggests that current levels of tritium emissions from CANDU reactors in Canada are not related to adverse health effects. However, these studies lack tritium-specific dose data and have small numbers of cases. The purpose of our study was to determine whether tritium emitted from a nuclear-generating station during routine operation is associated with risk of cancer in Pickering, Ontario. A retrospective cohort was formed through linkage of Pickering and north Oshawa residents (1985) to incident cancer cases (1985-2005). We examined all sites combined, leukemia, lung, thyroid and childhood cancers (6-19 years) for males and females as well as female breast cancer. Tritium estimates were based on an atmospheric dispersion model, incorporating characteristics of annual tritium emissions and meteorology. Tritium concentration estimates were assigned to each cohort member based on exact location of residence. Person-years analysis was used to determine whether observed cancer cases were higher than expected. Cox proportional hazards regression was used to determine whether tritium was associated with radiation-sensitive cancers in Pickering. Person-years analysis showed female childhood cancer cases to be significantly higher than expected (standardized incidence ratio [SIR] = 1.99, 95% confidence interval [CI]: 1.08-3.38). The issue of multiple comparisons is the most likely explanation for this finding. Cox models revealed that female lung cancer was significantly higher in Pickering versus north Oshawa (HR = 2.34, 95% CI: 1.23-4.46) and that tritium was not associated with increased risk. The improved methodology used in this study adds to our understanding of cancer risks associated with low-dose tritium exposure. Tritium estimates were not associated with increased risk of radiationsensitive cancers in Pickering.

  10. Proceedings of the of the Tenth Workshop on Language Descriptions, Tools and Applications (LDTA 2010)

    DEFF Research Database (Denmark)

    Brabrand, Claus

    2010-01-01

    This volume contains the proceedings of the Tenth Workshop on Language Descriptions, Tools and Applications (LDTA 2010), held in Paphos, Cyprus on March 28--29, 2010. LDTA is a two-day satellite event of ETAPS (European Joint Conferences on Theory and Practice of Software) organized in cooperation...... with ACM Sigplan. LDTA is an application and tool-oriented forum on meta programming in a broad sense. A meta program is a program that takes other programs as input or output. The focus of LDTA is on generated or otherwise efficiently implemented meta programs, possibly using high level descriptions...... of programming languages. Tools and techniques presented at LDTA are usually applicable in the context of "Language Workbenches" or "Meta Programming Systems" or simply as parts of advanced programming environments or IDEs. These proceedings include an extended abstract based on the invited talk by Jean...

  11. Public channel cryptography: chaos synchronization and Hilbert's tenth problem.

    Science.gov (United States)

    Kanter, Ido; Kopelowitz, Evi; Kinzel, Wolfgang

    2008-08-22

    The synchronization process of two mutually delayed coupled deterministic chaotic maps is demonstrated both analytically and numerically. The synchronization is preserved when the mutually transmitted signals are concealed by two commutative private filters, a convolution of the truncated time-delayed output signals or some powers of the delayed output signals. The task of a passive attacker is mapped onto Hilbert's tenth problem, solving a set of nonlinear Diophantine equations, which was proven to be in the class of NP-complete problems [problems that are both NP (verifiable in nondeterministic polynomial time) and NP-hard (any NP problem can be translated into this problem)]. This bridge between nonlinear dynamics and NP-complete problems opens a horizon for new types of secure public-channel protocols.

  12. Tenth workshop on the algorithmic foundations of robotics (WAFR)

    CERN Document Server

    Lozano-Perez, Tomas; Roy, Nicholas; Rus, Daniela; Algorithmic foundations of robotics X

    2013-01-01

    Algorithms are a fundamental component of robotic systems. Robot algorithms process inputs from sensors that provide noisy and partial data, build geometric and physical models of the world, plan high-and low-level actions at different time horizons, and execute these actions on actuators with limited precision. The design and analysis of robot algorithms raise a unique combination of questions from many elds, including control theory, computational geometry and topology, geometrical and physical modeling, reasoning under uncertainty, probabilistic algorithms, game theory, and theoretical computer science. The Workshop on Algorithmic Foundations of Robotics (WAFR) is a single-track meeting of leading researchers in the eld of robot algorithms. Since its inception in 1994, WAFR has been held every other year, and has provided one of the premiere venues for the publication of some of the eld's most important and lasting contributions. This books contains the proceedings of the tenth WAFR, held on June 13{15 201...

  13. Palo Verde Nuclear Generating Station, Units 1, 2 and 3 (Docket Nos. STN 50-528, STN 50-529 and STN 50-530): Final environmental statement

    International Nuclear Information System (INIS)

    1975-09-01

    The proposed action is the issuance of construction permits to the Arizona public Service Company for the construction of the Palo Verde Nuclear Generating Station, Units 1, 2, and 3. Preparation of the 3800-acre site will involve the clearing of up to 2500 acres of land, 1500 of which will be prominently devoted to station facilities. An additional 1200- to 1300-acre evaporation pond will ultimately be developed during the lifetime of the station. About 2200 site acres, previously devoted to agriculture, will be excluded from this land use. Soil disturbance during construction of the station, transmission lines, and water conveyance pipeline will tend to promote erosion and increase siltation in local ephemeral water courses. Stringent measures will be taken to minimize these effects. The total radiation dose to construction workers is estimated to be 15 man-rem. This dose is a small fraction of the approximately 470 man-rem which will be received by the construction force over the same period from natural background radiation. Station, transmission line, and water pipeline construction will kill, remove, displace, or otherwise disturb involved flora and fauna, and will eliminate varying amounts of wildlife breeding, nesting, and forage habitat. These will not be important permanent impacts to the population stability and structure of the involved local ecosystems of the Sonoran desert; however, measures will be taken to minimize such effects as do result form the proposed action

  14. Secure base stations

    NARCIS (Netherlands)

    Bosch, Peter; Brusilovsky, Alec; McLellan, Rae; Mullender, Sape J.; Polakos, Paul

    2009-01-01

    With the introduction of the third generation (3G) Universal Mobile Telecommunications System (UMTS) base station router (BSR) and fourth generation (4G) base stations, such as the 3rd Generation Partnership Project (3GPP) Long Term Evolution (LTE) Evolved Node B (eNB), it has become important to

  15. Final Environmental Statement related to the operation of Wolf Creek Generating Station, Unit No. 1. Docket No. STN 50-482, Kansas Gas and Electric Company, et al

    International Nuclear Information System (INIS)

    1982-06-01

    This final environmental statement contains the second assessment of the environmental impact associated with operation of Wolf Creek Generating Station Unit 1 pursuant to the National Environmental Policy Act of 1969 (NEPA) and 10 CFR Part 51, as amended, of the NRC's regulations. This statement examines: the affected environment, environmental consequences and mitigating actions, and environmental and economic benefits and costs. Land use and terrestrial- and aquatic-ecological impacts will be small. Air-quality impacts will also be small. However, steam fog from the station's cooling lake has the potential for reducing visibility over nearby roads and bridges. A fog-monitoring program for roads and bridges near the lake has been recommended. Impacts to historic and prehistoric sites will be negligible. Chemical discharges to the Neosho River are expected to have no appreciable impacts on water quality under normal conditions and will be required to meet conditions of the station's NPDES permit. The effects of routine operations, energy transmission, and periodic maintenance of rights-of-way and transmission line facilities should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity. The risk associated with accidental radiation exposure is very low. The net socioeconomic effects of the project will be beneficial. The action called for is the issuance of an operating license for the Wolf Creek Generating Station Unit 1

  16. Post-Flight Microbial Analysis of Samples from the International Space Station Water Recovery System and Oxygen Generation System

    Science.gov (United States)

    Birmele, Michele N.

    2011-01-01

    The Regenerative, Environmental Control and Life Support System (ECLSS) on the International Space Station (ISS) includes the the Water Recovery System (WRS) and the Oxygen Generation System (OGS). The WRS consists of a Urine Processor Assembly (UPA) and Water Processor Assembly (WPA). This report describes microbial characterization of wastewater and surface samples collected from the WRS and OGS subsystems, returned to KSC, JSC, and MSFC on consecutive shuttle flights (STS-129 and STS-130) in 2009-10. STS-129 returned two filters that contained fluid samples from the WPA Waste Tank Orbital Recovery Unit (ORU), one from the waste tank and the other from the ISS humidity condensate. Direct count by microscopic enumeration revealed 8.38 x 104 cells per mL in the humidity condensate sample, but none of those cells were recoverable on solid agar media. In contrast, 3.32 x lOs cells per mL were measured from a surface swab of the WRS waste tank, including viable bacteria and fungi recovered after S12 days of incubation on solid agar media. Based on rDNA sequencing and phenotypic characterization, a fungus recovered from the filter was determined to be Lecythophora mutabilis. The bacterial isolate was identified by rDNA sequence data to be Methylobacterium radiotolerans. Additional UPA subsystem samples were returned on STS-130 for analysis. Both liquid and solid samples were collected from the Russian urine container (EDV), Distillation Assembly (DA) and Recycle Filter Tank Assembly (RFTA) for post-flight analysis. The bacterium Pseudomonas aeruginosa and fungus Chaetomium brasiliense were isolated from the EDV samples. No viable bacteria or fungi were recovered from RFTA brine samples (N= 6), but multiple samples (N = 11) from the DA and RFTA were found to contain fungal and bacterial cells. Many recovered cells have been identified to genus by rDNA sequencing and carbon source utilization profiling (BiOLOG Gen III). The presence of viable bacteria and fungi from WRS

  17. Co-ordination of federal and provincial environmental assessment processes for the Point Lepreau Generating Station Solid Radioactive Waste Management Facility modifications

    International Nuclear Information System (INIS)

    Hickman, C.; Thompson, P.D.; Barnes, J.

    2006-01-01

    Modification of the Solid Radioactive Waste Management Facility at Point Lepreau Generating Station is required to accommodate waste generated during and after an 18-month maintenance outage during which the station would be Refurbished. The modification of the facility triggered both federal and provincial environmental assessment requirements, and these assessments were conducted in a 'coordinated' and cooperative fashion. In this project, the coordinated approach worked well, and provided some significant advantages to the proponent, the public and the regulators. However, there are opportunities for further improvement in future projects, and this paper explores the advantages and disadvantages of this 'co-ordinated' approach. As part of this exploration, there is a discussion of administrative and regulatory changes that the province is considering for the environmental assessment process, and a discussion of the need for a formal 'harmonization' agreement. (author)

  18. A New Iterative Scheme for the Solution of Tenth Order Boundary ...

    African Journals Online (AJOL)

    A new iterative scheme for the solution of tenth order boundary value problems has been implemented using first-kind Chebychev polynomials as trial functions. The method involves transforming tenth order boundary value problems into a system of ordinary differential equations (ODEs). The trial solution is introduced into ...

  19. Potential for use of condenser cooling waters from fossil fuel and nuclear power generating stations for freshwater aquaculture in cold climates

    International Nuclear Information System (INIS)

    Armstrong, G.C.

    1976-01-01

    Some limiting factors to the future development of freshwater aquaculture are considered. The most important of these are the need for new and improved technology for the production of better quality products at lower cost and for the promotion and establishment of new markets. The use of relatively small amounts of heated effluent water from power generating stations to optimize water temperatures is one feasible method for increasing growth and lowering the cost of production. (author)

  20. Technical specifications: Hope Creek Generating Station (Docket No. 50-354). Appendix A to License No. NPF-50

    International Nuclear Information System (INIS)

    1986-04-01

    Information is provided on the technical specifications for the Hope Creek Nuclear Power Station. Areas of interest discussed in this report include: safety limits and limiting safety system settings; limiting conditions for operation and surveillance requirements; design features; and administrative controls

  1. A new method to assess mercury emissions: a study of three coal-fired electric-generating power station configurations.

    Science.gov (United States)

    Boylan, Helen M; Cain, Randy D; Kingston, H M

    2003-11-01

    U.S. Environmental Protection Agency (EPA) Method 7473 for the analysis of mercury (Hg) by thermal decomposition, amalgamation, and atomic absorption spectroscopy has proved successful for use in Hg assessment at coal-fired power stations. In an analysis time of approximately 5 min per sample, this instrumental methodology can directly analyze total Hg--with no discrete sample preparation--in the solid matrices associated with a coal-fired power plant, including coal, fly ash, bottom ash, and flue gas desulfurization (FGD) material. This analysis technique was used to investigate Hg capture by coal combustion byproducts (CCBs) in three different coal-fired power plant configurations. Hg capture and associated emissions were estimated by partial mass balance. The station equipped with an FGD system demonstrated 68% capture on FGD material and an emissions estimate of 18% (11 kg/yr) of total Hg input. The power plant equipped with low oxides of nitrogen burners and an electrostatic precipitator (ESP) retained 43% on the fly ash and emitted 57% (51 kg/yr). The station equipped with conventional burners and an ESP retained less than 1% on the fly ash, emitting an estimated 99% (88 kg/yr) of Hg. Estimated Hg emissions demonstrate good agreement with EPA data for the power stations investigated.

  2. 76 FR 52357 - Exelon Generation Company, LLC; PSEG Nuclear, LLC; Peach Bottom Atomic Power Station, Unit 3...

    Science.gov (United States)

    2011-08-22

    ... NRC Library at http://www.nrc.gov/reading-rm/adams.html . From this page, the public can gain entry... operation of the Peach Bottom Atomic Power Station (PBAPS), Unit 3, located in York and Lancaster Counties... from the NRC Library on the NRC Web site at http://www.nrc.gov/reading-rm/doc-collections/cfr/ . III...

  3. Overhaul of the generator of the hydroelectric central station Ingeniero Carlos Ramirez Ulloa; Rehabilitacion del generador de la unidad 2 de la central hidroelectrica ingeniero Carlos Ramirez Ulloa

    Energy Technology Data Exchange (ETDEWEB)

    Robles Pimentel, Edgar [Instituto de Investigaciones Electricas, Cuernavaca (Mexico); Garcia Hernandez, Javier [Comision Federal de Electricidad, Mexico, D. F. (Mexico)

    1997-12-31

    In November 1995, the failure of the Unit 2 generator at the hydroelectric central station Ingeniero Carlos Ramirez Ulloa, El Caracol, occurred. The accident forced to carry out its overhaul. Here are presented the technical problems faced during the overhaul of the generator and analyzed the implemented solutions. [Espanol] En noviembre de 1995 ocurrio la falla del generador de la unidad 2 de la central hidroelectrica Ing. Carlos Ramirez Ulloa, El Caracol. El accidente obligo a llevar a cabo su rehabilitacion. Se presentan los problemas tecnicos enfrentados durante la rehabilitacion del generador y se discuten las soluciones implementadas.

  4. Analysis methodology of power generation/cogeneration designs in VNG (Vehicular Natural Gas) stations; Metodologia de analise de projetos de geracao/cogeracao em postos GNV (Gas Natural Veicular)

    Energy Technology Data Exchange (ETDEWEB)

    Romanos, Rafael Reami [Companhia de Gas de Santa Catarina (SCGAS), Florianopolis, SC (Brazil)

    2008-07-01

    This work presents the methodology for analysis of generation/cogeneration projects in NGV filling stations, determining the influence of critical parameters in its technical-economic viability. To achieve this methodology, it was necessary to define parameters that influence directly or indirectly the size of a generating system, as the total electric demand of the filling station, ratio (power of the compressor) / (total installed power), load factor, factor of simultaneity, technical data of major equipment, among others. The methodology has been validated by comparing with data measured in a NGV filling station and allows screening and identifying customers with technical feasibility to evolve in a generation or cogeneration project. The cogeneration with NG generators was highlighted during the analysis of the NGV filling stations and was feasible for establishments which have large thermal demand, as filling stations along the road with large amounts of electric showers in changing rooms. (author)

  5. Gerbert of Aurillac: Astronomy and Geometry in Tenth Century Europe

    Science.gov (United States)

    Sigismondi, Costantino

    2013-01-01

    Gerbert of Aurillac was the most prominent personality of the tenth century: astronomer, organ builder and music theoretician, mathematician, philosopher, and finally pope with the name of Silvester II (999-1003). Gerbert introduced firstly the arabic numbers in Europe, invented an abacus for speeding the calculations and found a rational approximation for the equilateral triangle area, in the letter to Adelbold here discussed. Gerbert described a semi-sphere to Constantine of Fleury with built-in sighting tubes, used for astronomical observations. The procedure to identify the star nearest to the North celestial pole is very accurate and still in use in the XII century, when Computatrix was the name of Polaris. For didactical purposes the Polaris would have been precise enough and much less time consuming, but here Gerbert was clearly aligning a precise equatorial mount for a fixed instrument for accurate daytime observations. Through the sighting tubes it was possible to detect equinoxes and solstices by observing the Sun in the corresponding days. The horalogium of Magdeburg was probably a big and fixed-mount nocturlabe, always pointing the star near the celestial pole.

  6. Peer Victimization in Fifth Grade and Health in Tenth Grade

    Science.gov (United States)

    Elliott, Marc N.; Klein, David J.; Tortolero, Susan R.; Mrug, Sylvie; Peskin, Melissa F.; Davies, Susan L.; Schink, Elizabeth T.; Schuster, Mark A.

    2014-01-01

    BACKGROUND AND OBJECTIVES: Children who experience bullying, a type of peer victimization, show worse mental and physical health cross-sectionally. Few studies have assessed these relationships longitudinally. We examined longitudinal associations of bullying with mental and physical health from elementary to high school, comparing effects of different bullying histories. METHODS: We analyzed data from 4297 children surveyed at 3 time points (fifth, seventh, and tenth grades) in 3 cities. We used multivariable regressions to test longitudinal associations of bullying with mental and physical health by comparing youth who experienced bullying in both the past and present, experienced bullying in the present only, experienced bullying in the past only, or did not experience bullying. RESULTS: Bullying was associated with worse mental and physical health, greater depression symptoms, and lower self-worth over time. Health was significantly worse for children with both past and present bullying experiences, followed by children with present-only experiences, children with past-only experiences, and children with no experiences. For example, 44.6% of children bullied in both the past and present were at the lowest decile of psychosocial health, compared with 30.7% of those bullied in the present only (P = .005), 12.1% of those bullied in the past only (P bullied (P < .001). CONCLUSIONS: Both chronic and current bullying are associated with substantially worse health. Clinicians who recognize bullying when it first starts could intervene to reverse the downward health trajectory experienced by youth who are repeated targets. PMID:24534401

  7. Proceedings of the tenth annual conference on fossil energy materials

    Energy Technology Data Exchange (ETDEWEB)

    Cole, N.C.; Judkins, R.R. [comps.

    1996-08-01

    The Tenth Annual Conference on Fossil Energy Materials was held in Knoxville, Tennessee, on May 14-16, 1996. The meeting was sponsored by the U.S. Department of Energy`s (DOE) Office of Fossil Energy through the Advanced Research and Technology Development (AR&TD) Materials Program. The objective of the AR&TD Materials Program is to conduct research and development on materials for longer-term fossil energy applications as well as for generic needs of various fossil fuel technologies. The management of the program has been decentralized to the DOE Oak Ridge Operations Office and Oak Ridge National Laboratory (ORNL). The research is performed by staff members at ORNL and by researchers at other national laboratories, universities, and in private industry. The work is divided into the following categories: (1) structural ceramics, (2) new alloys and coatings, (3) functional materials, and (4) technology development and transfer. This conference is held each year to review the work on all of the projects of the program. The final program for the meeting is given in Appendix A, and a list of attendees is presented in Appendix B. Selected items have been processed separately for inclusion in the Energy Science and Technology database.

  8. On the legal nature of electricity supply contracts concluded by electricity companies and power stations generating electricity from renewable energy sources

    International Nuclear Information System (INIS)

    Herrmann, B.J.

    1998-01-01

    Section 2 of the German Act for enhanced use of electricity from renewable energy sources (StEG) defines the obligation to contract but not the contractual obligations, i.e. the conditions of performance of the contract (supply and purchase of electricity and the legal obligations of contractors). The analysis here shows that characterising this mandatory contract required by the act as an agreement of purchase and sale more appropriately describes the legal nature of the contract and the intent of the legislator than other contracts for supply and purchase of electricity, as for instance those concluded by electric utilities and their customers. One specific aspect elaborated by the author is that the StEG does not constitute an obligation to supply on the part of the renewable energy generating power station, so that the power station operator is not obliged to ensure availability of the electricity at any time or in terms of supplies that can be called off by the purchasing utility, whereas the electric utility is obliged by section 2 of the StEG to purchase the contractual amounts from the generating station. (orig./CB) [de

  9. Palo Verde Nuclear Generating Station Units 1, 2, and 3: Draft environmental statement (Docket Nos. STN 50-528, 529, and 530)

    International Nuclear Information System (INIS)

    1975-04-01

    The proposed action is the issuance of construction permits to the Arizona Public Service Corporation for the construction of the Palo Verde Nuclear Generating Station, Units 1, 2 and 3. Preparation of the 3880-acre site will involve the clearing of up to 2500 acres of land, 1500 of which will be permanently devoted to station facilities. An additional 1200- to 1300-acre evaporation pond will ultimately be developed during the lifetime of the station. About 2200 site acres, previously devoted to agriculture, will be excluded from this land use (Sec. 4. 1). Soil disturbance during construction of the station, transmission lines, and water conveyance pipeline will tend to promote erosion and increase siltation in local ephemeral water courses. Stringent measures will be taken to minimize these effects (Sec. 4.5). Station, transmission line, and water pipeline construction will kill, remove displace, or otherwise disturb involved flora and fauna, and will eliminate varying amounts of wildlife breeding, nesting, and forage habitat. These will not be important impacts to the population stability and structure of the involved local ecosystems of the Sonoran desert; however, measures will be taken to minimize such effects (Sec. 4.3 and 4.5). Approximately 60 acres of agricultural land will be temporarily affected by construction in transmission corridors. The great majority can be returned to that use upon completion of construction, thus the impact is considered minor. Similarly, most grazing lands affected along these corridors, as well as along the water pipeline corridor, can eventually be returned to that use. New archaeological resources could be discovered along the path of final transmission corridor alignments. The applicant will take measures to locate and protect such resources if they exist. 75 refs., 24 figs., 65 tabs

  10. Characterization of alternative electric generation technologies for the SPS comparative assessment: volume 2, central-station technologies

    Energy Technology Data Exchange (ETDEWEB)

    1980-08-01

    The SPS Concept Development and Evaluation Program includes a comparative assessment. An early first step in the assessment process is the selection and characterization of alternative technologies. This document describes the cost and performance (i.e., technical and environmental) characteristics of six central station energy alternatives: (1) conventional coal-fired powerplant; (2) conventional light water reactor (LWR); (3) combined cycle powerplant with low-Btu gasifiers; (4) liquid metal fast breeder reactor (LMFBR); (5) photovoltaic system without storage; and (6) fusion reactor.

  11. Characterization of alternative electric generation technologies for the SPS comparative assessment: volume 2, central-station technologies

    International Nuclear Information System (INIS)

    1980-08-01

    The SPS Concept Development and Evaluation Program includes a comparative assessment. An early first step in the assessment process is the selection and characterization of alternative technologies. This document describes the cost and performance (i.e., technical and environmental) characteristics of six central station energy alternatives: (1) conventional coal-fired powerplant; (2) conventional light water reactor (LWR); (3) combined cycle powerplant with low-Btu gasifiers; (4) liquid metal fast breeder reactor (LMFBR); (5) photovoltaic system without storage; and (6) fusion reactor

  12. Aseismatic design and safety of nuclear power generation facilities. On aseismatic capability of commercial nuclear power stations

    International Nuclear Information System (INIS)

    Kato, Muneaki

    1995-01-01

    In view of the great Hanshin earthquake, the aseismatic safety of the important facilities in nuclear power stations is ensured by the location direct on base rocks, the design with the earthquake force at least three times as large as that in the building standard, and the consideration of the earthquakes due to active faults as design earthquake. The basic policy of the aseismatic design of nuclear power stations is described. The determination of the earthquake motions due to strongest earthquake and utmost limit earthquake for design, the survey of the geological features and ground of the sites and so on are explained. In the aseismatic design of buildings and structures, structural planning, the modeling for the aseismatic analysis of buildings, the analysis of time historical response and so on are carried out. In the aseismatic design of equipment and piping systems, the planning of aseismatic support structures, the aseismatic design and the analysis of time historical response, the spectral modal analysis for other systems such as multiple material point system and so on are described. The tests and researches related to the aseismatic design are reported. (K.I.)

  13. Socioeconomic impacts of nuclear generating stations - Diablo Canyon case study. Technical report for 1 Oct 78-4 Jan 82

    International Nuclear Information System (INIS)

    Pijawka, K.D.; Yaquinto, G.

    1982-07-01

    This report documents a case study of the socioeconomic impacts of the construction and operation of the Diablo Canyon nuclear power station. It is part of a major post-licensing study of the socioeconomic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period, 1980-81. The case study deals with changes in the economy, population, settlemeent patterns and housing, local government and public services, social structure, and public response in the study during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socioeconomic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  14. Socioeconomic impacts of nuclear generating stations: St. lucie case study. Technical report 1 Oct 78-4 Jan 82

    International Nuclear Information System (INIS)

    Weisiger, M.L.; Pijawka, K.D.

    1982-07-01

    The report documents a case study of the socioeconomic impacts of the construction and operation of the St. Lucie nuclear power station. It is part of a major post-licensing study of the socioeconomic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period, 1980-81. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study are during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socioeconomic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  15. Socioeconomic impacts of nuclear generating stations: Oconee case study. Technical report 1 Oct 78-4 Jan 82

    International Nuclear Information System (INIS)

    Flynn, J.

    1982-07-01

    The report documents a case study of the socioeconomic impacts of the construction and operation of the Oconee nuclear power station. It is part of a major post-licensing study of the socioeconomic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period, 1980-81. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study area during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socioeconomic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  16. Socioeconomic impacts of nuclear generating stations: D. C. Cook case study. Technical report 1 Oct 78-4 Jan 82

    International Nuclear Information System (INIS)

    Branch, K.

    1982-07-01

    The report documents a case study of the socioeconomic impacts of the construction and operation of the D. C. Cook nuclear power station. It is part of a major post-licensing study of the socioeconomic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period, 1980-81. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study area during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socioeconomic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  17. Socioeconomic impacts of nuclear generating stations: Rancho Seco case study. Technical report 1 Oct 78-4 Jan 82

    International Nuclear Information System (INIS)

    Bergmann, P.A.

    1982-07-01

    The report documents a case study of the socioeconomic impacts of the construction and operation of the Rancho Seco nuclear power station. It is part of a major post-licensing study of the socioeconomic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period, 1980-81. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study area during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socioeconomic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  18. Socioeconomic impacts of nuclear generating stations: Surry case study. Technical report 1 Oct 78-4 Jan 82

    International Nuclear Information System (INIS)

    Flynn, J.

    1982-07-01

    The report documents a case study of the socioeconomic impacts of the construction and operation of the Surry nuclear power station. It is part of a major post-licensing study of the socioeconomic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period, 1980-81. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study area during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socioeconomic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  19. Socioeconomic impacts of nuclear generating stations: Three Mile Island case study. Technical report 1 Oct 78-4 Jan 82

    International Nuclear Information System (INIS)

    Flynn, C.

    1982-07-01

    The report documents a case study of the socioeconomic impacts of the construction and operation of the Three Mile Island nuclear power station. It is part of a major post-licensing study of the socioeconomic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period, 1980-81. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study area during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socioeconomic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  20. Socioeconomic impacts of nuclear generating stations: Peach Bottom case study. Technical report 1 Oct 78-4 Jan 82

    International Nuclear Information System (INIS)

    Pijawka, K.D.

    1982-07-01

    The report documents a case study of the socioeconomic impacts of the construction and operation of the Peach Bottom nuclear power station. It is part of a major post-licensing study of the socioeconomic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period, 1980-81. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study area during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socioeconomic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  1. NRC Fact-Finding Task Force report on the ATWS event at Salem Nuclear Generating Station, Unit 1, on February 25, 1983

    International Nuclear Information System (INIS)

    1983-03-01

    An NRC Region I Task Force was established on March 1, 1983 to conduct fact finding and data collection with regard to the circumstances which led to an anticipated transient without scram (ATWS) event at the Public Service Electric and Gas Company's Salem Generating Station, Unit 1 on February 25, 1983. The charter of the Task Force was to determine the factual information pertinent to management and administrative controls which should have ensured proper operation of the reactor trip breakers in the solid state protection system. This report documents the findings of the Task Force along with its conclusions

  2. Safety Evaluation Report related to the operation of Wolf Creek Generating Station, Unit No. 1 (Docket No. STN 50-482). Supplement No. 6

    International Nuclear Information System (INIS)

    1985-06-01

    This report supplements the Safety Evaluation Report (SER) for the application filed by the Kansas Gas and Electric Company, as applicant and agent for the owners, for a license to operate the Wolf Creek Generating Station, Unit 1 (Docket No. STN 50-482). The facility is located in Coffey County, Kansas. This supplement provides recent information regarding resolution of the license conditions identified in the SER. Because of the favorable resolution of the items discussed in this report, the staff concludes that the facility can be operated by the licensee at power levels greater than 5% without endangering the health and safety of the public

  3. Safety-evaluation report related to the operation of Limerick Generating Station, Units 1 and 2 (Docket Nos. 50-352 and 50-353)

    International Nuclear Information System (INIS)

    1983-08-01

    The Safety Evaluation Report for the application filed by the Philadelphia Electric Company, as applicant and owner, for licenses to operate the Limerick Generating Station Units 1 and 2 (Docket Nos. 50-352 and 50-353), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located near Pottstown, Pennsylvania. Subject to favorable resolution of the items discussed in this report, the NRC staff concludes that the facility can be operated by the applicant without endangering the health and safety of the public

  4. Safety evaluation report related to the operation of Limerick Generating Station, Units 1 and 2 (Docket Nos. 50-352-50-353). Supplement 1

    International Nuclear Information System (INIS)

    1983-12-01

    This report supplements the Safety Evaluation Report (NUREG-0991, August 1983) for the application filed by the Philadelphia Electric Company, as applicant and owner, for licenses to operate the Limerick Generating Station Units 1 and 2 (Docket Nos. 50-352 and 50-353). The facility is located near Pottstown, Pennsylvania. Subject to favorable resolution of the items discussed in this report, the NRC staff concludes that the facility can be operated by the applicant without endangering the health and safety of the public

  5. Meteosat Second Generation station: processing software and computing arquitecture; Estacion de Recepcion de Imagenes del Satelite Meteosat Segunda generacion: Arquitectura Informatica y Software de Proceso

    Energy Technology Data Exchange (ETDEWEB)

    Martin, L.; Cony, M.; Navarro, A. A.; Zarzalejo, L. F.; Polo, J.

    2010-05-01

    The Renewable Energy Division of CIEMAT houses a specific station for receiving the Meteosat Second Generation images, which is of interest in the works being carried out concerning the solar radiation derived from satellite images. The complexity, the huge amount of information being received and the particular characteristics of the MSG images encouraged the design and development of a specific computer structure and the associated software as well, for a better and more suitable use of the images. This document describes the mentioned structure and software. (Author) 8 refs.

  6. Property Analysis of the Real-Time Uncalibrated Phase Delay Product Generated by Regional Reference Stations and Its Influence on Precise Point Positioning Ambiguity Resolution.

    Science.gov (United States)

    Zhang, Yong; Wang, Qing; Jiang, Xinyuan

    2017-05-19

    The real-time estimation of the wide-lane and narrow-lane Uncalibrated Phase Delay (UPD) of satellites is realized by real-time data received from regional reference station networks; The properties of the real-time UPD product and its influence on real-time precise point positioning ambiguity resolution (RTPPP-AR) are experimentally analyzed according to real-time data obtained from the regional Continuously Operating Reference Stations (CORS) network located in Tianjin, Shanghai, Hong Kong, etc. The results show that the real-time wide-lane and narrow-lane UPD products differ significantly from each other in time-domain characteristics; the wide-lane UPDs have daily stability, with a change rate of less than 0.1 cycle/day, while the narrow-lane UPDs have short-term stability, with significant change in one day. The UPD products generated by different regional networks have obvious spatial characteristics, thus significantly influencing RTPPP-AR: the adoption of real-time UPD products employing the sparse stations in the regional network for estimation is favorable for improving the regional RTPPP-AR up to 99%; the real-time UPD products of different regional networks slightly influence PPP-AR positioning accuracy. After ambiguities are successfully fixed, the real-time dynamic RTPPP-AR positioning accuracy is better than 3 cm in the plane and 8 cm in the upward direction.

  7. Sociological impacts of nuclear generating stations - summary report on the NRC post-licensing studies. Final report 1 Oct 78-4 Jan 82

    International Nuclear Information System (INIS)

    Chalmers, J.; Pijawka, D.; Branch, K.; Bergmann, P.; Flynn, J.

    1982-07-01

    The Post-Licensing Studies had four objectives. The first was to identify the socioeconomic effects resulting from the construction and operation of each of twelve nuclear power stations. The socioeconomic variables examined included: economic, demographic, housing, government, public response, and social organization characteristics. The second objective was to determine the way in which the identified effects were evaluated by study area groups. The third objective was to identify the determinants of the project-related effects. This task required knowledge of what combination of site, project, or other determinants was responsible for the project-related effects and for the evaluation of the effects. The fourth objective was to make recommendations with respect to assessment methodologies that could best be used to project the socioeconomic effects of the construction and operation of proposed nuclear generating stations. The objectives of the Post-Licensing Studies are met by the twelve individual case studies and by the Summary Report. The case studies identified the nuclear power stations and describe the evaluation of the effects by area residents. The Summary Report describes the collective findings of the individual case studies, compares the findings across sites to identify possible determinants of the effects, and examines the implication of the findings for future siting decisions and for the methodology most appropriate for projective assessments

  8. Tenth Semiannual Report of the Commission to the Congress, July 1951

    Energy Technology Data Exchange (ETDEWEB)

    Dean, Gordon

    1951-07-01

    The document represents the tenth semiannual Atomic Energy Commission (AEC) report to Congress. The report sums up the major activities and developments in the national atomic energy program covering the period January - June 1951.

  9. Doing harm: living organ donors, clinical research and The Tenth Man.

    OpenAIRE

    Elliott, C

    1995-01-01

    This paper examines the ethical difficulties of organ donation from living donors and the problem of causing harm to patients or research subjects at their request. Graham Greene explored morally similar questions in his novella, The Tenth Man.

  10. Electric Power Plants and Generation Stations, Power Plants - is a seperate layer, however, we have them included in local building layer as well, Published in 2010, 1:2400 (1in=200ft) scale, Effingham County Government.

    Data.gov (United States)

    NSGIC Local Govt | GIS Inventory — Electric Power Plants and Generation Stations dataset current as of 2010. Power Plants - is a seperate layer, however, we have them included in local building layer...

  11. HECO annually conducts and reports results of a biological monitoring program for waters receiving effluent from the Kahe Generating Station, O'ahu, Hawai'i from 1977 to 1996 (NODC Accession 9900012)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The volume of sand and silt entrained and circulated by operation of the Kahe Generating Station is an environmental parameter of considerable geological and...

  12. Design and prototyping of an ionic liquid piston compressor as a new generation of compressors for hydrogen refueling stations

    DEFF Research Database (Denmark)

    Arjomand Kermani, Nasrin

    to investigate the heat transfer phenomena inside the compression chamber; the system performance is evaluated, followed by the design process. The model is developed based on the mass and energy balance of the hydrogen, and liquid bounded by the wall of the compression chamber. Therefore, at each time step...... of the sensitivity analysis illustrate that increasing the total heat transfer coefficients at the interface and the wall, as well as compression time, play key roles in reducing the hydrogen temperature. Further optimization and increasing the total heat transfer coefficient at the interface (10000 times...... reciprocating compressors for compressing hydrogen in the hydrogen refueling stations. In addition, the corrosion behavior of various commercially available stainless steels and nickel-based alloys as possible construction materials for the components which are in direct contact with the selected ionic liquids...

  13. Optimal Site Selection of Wind-Solar Complementary Power Generation Project for a Large-Scale Plug-In Charging Station

    Directory of Open Access Journals (Sweden)

    Wenjun Chen

    2017-10-01

    Full Text Available The wind-solar hybrid power generation project combined with electric vehicle charging stations can effectively reduce the impact on the power system caused by the random charging of electric cars, contribute to the in-situ wind-solar complementary system and reduce the harm arising from its output volatility. In this paper, the site selection index system of a landscape complementary power generation project is established by using the statistical methods and statistical analysis in the literature. Subsequently, using the Analytic Network Process to calculate the index weight, a cloud model was used in combination with preference ranking organization method for enrichment evaluations to transform and sort uncertain language information. Finally, using the results of the decision-making for the location of the Shanghai wind-solar complementary project and by carrying out contrast analysis and sensitivity analysis, the superiority and stability of the decision model constructed in this study was demonstrated.

  14. NASA Education Activities on the International Space Station: A National Laboratory for Inspiring, Engaging, Educating and Employing the Next Generation

    Science.gov (United States)

    Severance, Mark T.; Tate-Brown, Judy; McArthur, Cynthia L.

    2010-01-01

    The International Space Station (ISS) National Lab Education Project has been created as a part of the ISS National Lab effort mandated by the U.S. Congress The project seeks to expand ISS education of activities so that they reach a larger number of students with clear educational metrics of accomplishments. This paper provides an overview of several recent ISS educational payloads and activities. The expected outcomes of the project, consistent with those of the NASA Office of Education, are also described. NASA performs numerous education activities as part of its ISS program. These cover the gamut from formal to informal educational opportunities in grades Kindergarten to grade 12, Higher Education (undergraduate and graduate University) and informal educational venues (museums, science centers, exhibits). Projects within the portfolio consist of experiments performed onboard the ISS using onboard resources which require no upmass, payloads flown to ISS or integrated into ISS cargo vehicles, and ground based activities that follow or complement onboard activities. Examples include ground based control group experiments, flight or experiment following lesson plans, ground based activities involving direct interaction with ISS or ground based activities considering ISS resources in their solution set. These projects range from totally NASA funded to projects which partner with external entities. These external agencies can be: other federal, state or local government agencies, commercial entities, universities, professional organizations or non-profit organizations. This paper will describe the recent ISS education activities and discuss the approach, outcomes and metrics associated with the projects.

  15. Development of elements of the condition monitoring system of turbo generators of thermal power stations and nuclear power plants

    Science.gov (United States)

    Kumenko, A. I.; Kostyukov, V. N.; Kuz'minykh, N. Yu.; Boichenko, S. N.; Timin, A. V.

    2017-08-01

    The rationale is given for the improvement of the regulatory framework for the use of shaft sensors for the in-service condition monitoring of turbo generators and the development of control systems of shaft surfacing and misalignments of supports. A modern concept and a set of methods are proposed for the condition monitoring of the "shaft line-thrust bearing oil film-turbo generator supports" system elements based on the domestic COMPACS® technology. The system raw data are design, technology, installation, and operating parameters of the turbo generator as well as measured parameters of the absolute vibration of supports and mechanical quantities, relative displacements and relative vibration of the rotor teeth in accordance with GOST R 55263-2012. The precalculated shaft line assembly line in the cold state, the nominal parameters of rotor teeth positions on the dynamic equilibrium curve, the static and dynamic characteristics of the oil film of thrust bearings, and the shaft line stiffness matrix of unit support displacements have been introduced into the system. Using the COMPACS-T system, it is planned to measure positions and oscillations of rotor teeth, to count corresponding static and dynamic characteristics of the oil film, and the static and dynamic loads in the supports in real time. Using the obtained data, the system must determine the misalignments of supports and corrective alignments of rotors of coupling halves, voltages in rotor teeth, welds, and bolts of the coupling halves, and provide automatic conclusion if condition monitoring parameters correspond to standard values. A part of the methodological support for the proposed system is presented, including methods for determining static reactions of supports under load, the method for determining shaft line stiffness matrices, and the method for solving the inverse problem, i.e., the determination of the misalignments of the supports by measurements of rotor teeth relative positions in bearing

  16. Evaluation of Risk Factors Affecting Substance Use among Tenth-Grade Students

    Directory of Open Access Journals (Sweden)

    Dilek Öztaş

    2018-01-01

    Full Text Available Aim. The aim of this study is to detect the prevalence of substance use among tenth-grade students; their thoughts, attitudes, behaviors, and tendencies towards substance use; and risk factors of substance use in tenth-grade students in general. Methods. This study is descriptive and cross-sectional conducted between April and May 2016. Research population consists of tenth-grade students in 2015-2016 school year in the city of Ordu. Since the study involved all tenth-grade students, no sampling was done. Questions on substance use were prepared by Ordu Public Health Directorate and the authors by making use of European School Survey Project on Alcohol and Other Drugs (ESPAD study questions, AMATEM’s “Drugs and Addiction Youth Survey” study conducted on May 1996, and scientific studies conducted previously on similar subjects. Results. 9825 tenth-grade students in 88 schools from 19 counties in the city of Ordu were included in the study. 8714 of the students participated in the survey. Being male, being over the age of 15, mother and father being separated, living with relatives, being in low income, negative feelings about school, perception of being unsuccessful in school, failing a year, absenteeism, and not being content with life are the risk factors for substance use. Conclusions. The tendency of illegal substance use becoming more and more prevalent especially among youth requires the development of new treatment strategies.

  17. Safety Evaluation Report related to the operation of Limerick Generating Station, Units 1 and 2 (Docket Nos. 50-352 and 50-353). Supplement No. 6

    International Nuclear Information System (INIS)

    1985-08-01

    In August 1983 the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-0991) regarding the application of the Philadelphia Electric Company (the licensee) for licenses to operate the Limerick Generating Station, Units 1 and 2, located on a site in Montgomery and Chester Counties, Pennsylvania. A license for the operation of Limerick Unit 1 was issued on October 26, 1984. The license, which was restricted to a five percent power level, contained conditions which required resolution prior to proceeding beyond the five percent power level. Supplement 4, issued in May 1985, addressed some of these issues. Supplement 4 also contained the comments made by the Advisory Committee on Reactor Safeguards in its report dated November 6, 1984, regarding full power operation of Limerick Unit 1. Supplement 5, issued in July 1985, and this Supplement 6 address further issues, principally the status of offsite emergency planning, that require resolution prior to proceeding beyond the five percent power level

  18. Draft environmental statement related to the operation of Limerick Generating Station, Units 1 and 2. Docket Nos. 50-352 and 50-353

    International Nuclear Information System (INIS)

    1983-06-01

    This Draft Environmental Statement contains the second assessment of the environmental impact associated with the operation of the Limerick Generating Station, Units 1 and 2, pursuant to the National Environment Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environment, environmental consequences and mitigating actions, and environmental and economic benefits and costs. Land use and terrestrial and aquatic ecological impacts will be small. Operational impacts to historic and archeological sites will be negligible. The effects of routine operations, energy transmission, and periodic maintenance of rights of way and transmission facilities should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity

  19. Safety Evaluation Report related to the operation of Wolf Creek Generating Station, Unit No. 1 (Docket No. STN 50-482). Supplement No. 5

    International Nuclear Information System (INIS)

    1985-03-01

    This report supplements the Safety Evaluation Report (SER) for the application filed by the Kansas Gas and Electric Company, as applicant and agent for the owners, for a license to operate the Wolf Creek Generating Station, Unit 1 (Docket No. STN 50-482). The facility is located in Coffey County, Kansas. This supplement has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission and provides recent information regarding resolution of the open items identified in the SER. Because of the favorable resolution of the items discussed in this report, the staff concludes that the facility can be operated by the applicant without endangering the health and safety of the public

  20. Environmental radiation surveillance conducted in the vicinity of the Fort St. Vrain Nuclear Generating Station for the Public Service Company of Colorado

    International Nuclear Information System (INIS)

    Johnson, J.E.

    1977-01-01

    During the second half of 1977 the Fort St. Vrain nuclear generating station operated as follows: for two days in July at an average power level of 16 MWe, for 13 days in August at an average power level of 42 MWe, for 23 days in September at an average power level of 76.5 MWe, for 30 days during October at an average power level of 102.7 MWe, for 16 days in November at an average power level of 113.6 MWe and was not critical during the month of December 1977. The environmental sampling included surface air, surface waters, sediments, soils, vegetation, milk, and beef from cattle grazing on the site. All radioactivity data were near background levels and near the minimum detactable activity (MDA) levels for each radionuclide and sample type

  1. Revised draft environmental statement related to construction of Atlantic Generating Station Units 1 and 2 (Docket Nos. STN 50-477 and STN 50-478)

    International Nuclear Information System (INIS)

    1976-10-01

    The proposed action is the issuance of a construction permit to Public Service Electric and Gas Company (PDE and G) for the construction of the Atlantic Generating Station (AGS), Units 1 and 2. The AGS is the first nuclear power station in the United States proposed for construction in the offshore waters on the continental shelf. The AHS will be located in the Atlantic Ocean 2.8 miles offshore of Atlantic and Ocean countries. New Jersey, 11 miles northeast of Atlantic City, and will consist of two floating nuclear power plants enclosed in a protective rubble-mound breakwater. Both plants will be identical, of standardized design, and will employ pressurized water reactors to produce up to approximately 3425 megawatts thermal (MWt) each. Steam turbine generators will use this heat to produce up to approximately 1150 megawatts of electrical power (MWe) per unit. The main condensers will be cooled by the flow of seawater drawn from within the breakwater and discharged shoreward and external to the breakwater. This statement identifies various environmental aspects and potential adverse effects associated with the construction and operation of the AGS. Based upon an approximate two-year review period which included a multidisciplined assessment of extensive survey and modeling data, these effects are considered by the staff to be of a generally acceptable nature. Breakwater construction will result in the destruction of 100 acres of benthic infauna (burrowing animals) and the development of a reef-type community on the breakwater. The production of new biomass (standing crop) by the reef community is expected to compensate for the infaunal biomass destroyed by dredging and will contribute mainly to the local sport fishery. 93 figs., 110 tabs

  2. Selective analysis of power plant operation on the Hudson River with emphasis on the Bowline Point Generating Station. Volume 2

    International Nuclear Information System (INIS)

    Barnthouse, L.W.; Cannon, J.B.; Christensen, S.G.

    1977-07-01

    Because of the location of the Bowline, Roseton, and Indian Point power generating facilities in the low-salinity zone of the Hudson estuary, operation of these plants with the present once-through cooling systems will adversely influence the fish populations that use the area for spawning and initial periods of growth and development. Recruitment rates and standing crops of several fish species may be lowered in response to the increased mortality caused by entrainment of nonscreenable eggs and larvae and by impingement of screenable young of the year. Entrainment and impingement data are particularly relevant for assessing which fish species have the greatest potential for being adversely affected by operation of Bowline, Roseton, and Indian Point with once-through cooling. These data from each of these three plants suggest that the six species that merit the greatest consideration are striped bass, white perch, tomcod, alewife, blueback herring, and bay anchovy. Two points of view are available for assessing the relative importance of the fish species in the Hudson River. From the fisheries point of view, the only two species of major importance are striped bass and shad. From the fish-community and ecosystem point of view, the dominant species, as determined by seasonal and regional standing crops (in numbers and biomass per hectare), are the six species most commonly entrained and impinged, namely, striped bass, white perch, tomcod, alewife, blueback herring, and anchovy

  3. Seasonal distribution and abundance of Ohio River fishes at the J.M. Stuart Electric Generating Station

    International Nuclear Information System (INIS)

    Yoder, C.O.; Gammon, J.R.

    1976-01-01

    Distributions of Ohio River fishes were studied in the vicinity of a 2400-Mw coal-fired electric generating plant. Three thermally elevated zones, two ambient river zones, and a backwater zone were sampled intensively from June 1974 through February 1975 following the completion of all four units of the power plant. Less intensive collections were made preceding and during construction from 1970 to 1973. Overall variations in water temperature in 1974 to 1975 ranged from 6 to 40 0 C in the heated zones, 4 to 30 0 C in the ambient river zones, and 5 to 27 0 C in the backwater zone. Seasonal and spatial differences in abundance, diversity, and faunal associations were largely influenced by temperature. Notable changes in species populations from 1970 to 1975 were observed which were attributed to power-plant operation. Although seasonal definitions in terms of summer, fall, and winter were generally used, they were of very limited value, as demonstrated by annual fluctuations in community parameters. Apparently near-freezing temperatures in the ambient river zones, as well as high summer temperatures in the effluent canal, limit the time fish can spend in these areas and force them to seek more hospitable temperatures. This suggests that there are critical winter as well as summer months, with spring/fall transitional periods in between in the vicinity of thermal effluents

  4. Fire Stations

    Data.gov (United States)

    Department of Homeland Security — Fire Stations in the United States Any location where fire fighters are stationed or based out of, or where equipment that such personnel use in carrying out their...

  5. Environmental radiological studies conducted during 1986 in the vicinity of the Rancho Seco Nuclear Power Generating Station

    International Nuclear Information System (INIS)

    Noshkin, V.E.; Wong, K.M.; Eagle, R.J.; Brunk, J.L.; Jokela, T.A.

    1987-03-01

    This report summarizes the information compiled in 1986 for our assessment of the environmental impact of radionuclides discharged with aqueous releases from the Rancho Seco Nuclear Power Generating Plant. In October 1984, a liquid-effluent control program was initiated that significantly reduced the quantities of radionuclides discharged with liquid waste from the plant. However, results from our sampling program in 1986 indicate that previously discharged radionuclides persist in the downstream environment and are found in many aquatic dietary components although at concentrations much lower than those measured in 1984 and 1985. The greatly reduced activities in the dietary components from the aquatic environment attest to the effectiveness of the liquid-effluent control program. Concentrations in the flesh of fish from the creeks have decreased over time and with distance from the plant outfall. The mean concentration of 137 Cs in fish collected from Laguna Creek at locations more than 7.5 km from Rancho Seco is now comparable to the concentration determined in fresh-water fish randomly selected from Chicago, Illinois, markets. By August 1986, the mean concentration of 137 Cs in the flesh of bluegill had fallen to 7% of the concentration measured in fish from comparable locations in 1984 and was 30% of the mean concentration measured in these fish during August 1985. Stable potassium in the water plays a major role in the accumulation of 137 Cs by fish. Concentrations of 137 Cs in the surface sections of creek sediments also declined between the end of 1984 and 1986 with an effective half-life of approximately 2 y. Surface soils collected around a perimeter 11 km from Rancho Seco and from ranchlands closer to the plant showed only concentrations of 137 Cs originating from global fallout. Soils previously irrigated with Clay Creek water retain levels of both 134 Cs and 137 Cs

  6. What kind of alchemy is attested by tenth-century Coptic manuscripts?

    Science.gov (United States)

    Richter, Tonio Sebastian

    2009-03-01

    This article places the four extant Coptic alchemical manuscripts within the context of the tradition of Coptic scientific texts. One of the manuscripts is a palimpsest written over an erased literary text, apparently in the tenth century. The other three all come from the same library, and are unlikely to be later than the mid-tenth century. Their vocabulary, form and contents are analysed, and the wonderful "machine of the sages" is introduced. It is shown that the texts most likely depend on Arabic alchemical texts, because of the number of Arabic words left in transliteration, and their style. In this case, they are the earliest witnesses to Arabic alchemy.

  7. Evaluation of a main steam line break with induced, multiple tube ruptures: A comparison of NUREG 1477 (Draft) and transient methodologies Palo Verde Nuclear Generating Station

    Energy Technology Data Exchange (ETDEWEB)

    Parrish, K.R.

    1995-09-01

    This paper presents the approach taken to analyze the radiological consequences of a postulated main steam line break event, with one or more tube ruptures, for the Palo Verde Nuclear Generating Station. The analysis was required to support the restart of PVNGS Unit 2 following the steam generator tube rupture event on March 14, 1993 and to justify continued operation of Units 1 and 3. During the post-event evaluation, the NRC expressed concern that Unit 2 could have been operating with degraded tubes and that similar conditions could exist in Units 1 and 3. The NRC therefore directed that a safety assessment be performed to evaluate a worst case scenario in which a non-isolable main steam line break occurs inducing one or more tube failures in the faulted steam generator. This assessment was to use the generic approach described in NUREG 1477, Voltage-Based Interim Plugging Criteria for Steam Generator Tubes - Task Group Report. An analysis based on the NUREG approach was performed but produced unacceptable results for off-site and control room thyroid doses. The NUREG methodology, however, does not account for plant thermal-hydraulic transient effects, system performance, or operator actions which could be credited to mitigate dose consequences. To deal with these issues, a more detailed analysis methodology was developed using a modified version of the Combustion Engineering Plant Analysis Code, which examines the dose consequences for a main steam line break transient with induced tube failures for a spectrum equivalent to 1 to 4 double ended guillotine U-tube breaks. By incorporating transient plant system responses and operator actions, the analysis demonstrates that the off-site and control room does consequences for a MSLBGTR can be reduced to acceptable limits. This analysis, in combination with other corrective and recovery actions, provided sufficient justification for continued operation of PVNGS Units 1 and 3, and for the subsequent restart of Unit 2.

  8. Combinatorics of tenth-order mock theta functions

    Indian Academy of Sciences (India)

    θ(q) there is some root of unity ζ for which f (q) − θ(q) is unbounded as q → ζ rapidly. In the long list of 17 mock theta functions given by Ramanujan, few have been interpreted combinatorially. For example, (q) defined by (1.1) below, has been interpreted by Fine. [8] as a generating function for partitions into odd parts without ...

  9. Model Planning of Literature Lessons in the Tenth Grade for the 1973/74 School Year

    Science.gov (United States)

    Gromtseva, S. N.

    1976-01-01

    Topics, materials, and assignments are provided for 49 literature lessons for tenth grade, plus review notes. Subject matter includes Gorky, Mayakovsky, Soviet literature in the 1920s, the 1930s, Tolstoi, the Great Patriotic War, Sholokhov, and modern foreign literature. (ND)

  10. Addendum: Tenth International Symposium on Alcohol Fuels, The road to commercialization

    Energy Technology Data Exchange (ETDEWEB)

    1994-05-01

    The Tenth International Symposium on ALCOHOL FUELS ``THE ROAD TO COMMERCIALIZATION`` was held at the Broadmoor Hotel, Colorado Springs, Colorado, USA November 7--10, 1993. Twenty-seven papers on the production of alcohol fuels, specifications, their use in automobiles, buses and trucks, emission control, and government policies were presented. Individual papers have been processed separately for entry into the data base.

  11. 77 FR 48584 - Tenth Meeting: RTCA Special Committee 222, Inmarsat Aeronautical Mobile Satellite (Route) Services

    Science.gov (United States)

    2012-08-14

    ... 222, Inmarsat Aeronautical Mobile Satellite (Route) Services AGENCY: Federal Aviation Administration..., Inmarsat Aeronautical Mobile Satellite (Route) Services. SUMMARY: The FAA is issuing this notice to advise the public of the tenth meeting of RTCA Special Committee 222, Inmarsat Aeronautical Mobile Satellite...

  12. Tenth annual meeting, Vienna, Austria, 29 March - 1 April 1977. Summary report. Part I

    International Nuclear Information System (INIS)

    1977-05-01

    The Summary Report of Tenth Annual Meeting of the IAEA International Working Group on Fast Reactors contains the Minutes of the Meeting (Part I); the papers which review the national programmes in the field of LMFBRs and other presentations at the Meeting (Part II); and the discussions on the review of the national programmes (Part III)

  13. GOD AS fATHER: THE REPRE- SENT A TION Of THE TENTH ...

    African Journals Online (AJOL)

    The representation of the tenth plague in children's Bibles. Prof. Jaqueline S. du Toit, Department of ... of the teaching of the study of religion at the University of the free State. His broad disciplinary range and ... tive act removed from its violent context; or explained away as pharaoh's just deserts for his slaughter of the ...

  14. Highlights of the tenth International Conference on Trichinellosis: past and future

    Directory of Open Access Journals (Sweden)

    Dupouy-Camet J.

    2001-06-01

    Full Text Available The Tenth International Conference on trichinellosis, organized by the International Commission on Trichinellosis, gathered together 147 scientists from 34 countries. The 173 presentations ranged over most aspects of this parasitic zoonosis: history, epidemiology, speciation, biology, immunology, biochemistry, human and anima pathology, new diagnostic methods and control.

  15. [STEM on Station Education

    Science.gov (United States)

    Lundebjerg, Kristen

    2016-01-01

    The STEM on Station team is part of Education which is part of the External Relations organization (ERO). ERO has traditional goals based around BHAG (Big Hairy Audacious Goal). The BHAG model is simplified to a saying: Everything we do stimulates actions by others to advance human space exploration. The STEM on Station education initiate is a project focused on bringing off the earth research and learning into classrooms. Educational resources such as lesson plans, activities to connect with the space station and STEM related contests are available and hosted by the STEM on Station team along with their partners such as Texas Instruments. These educational activities engage teachers and students in the current happenings aboard the international space station, inspiring the next generation of space explorers.

  16. Amtrak Stations

    Data.gov (United States)

    Department of Homeland Security — Updated database of the Federal Railroad Administration's (FRA) Amtrak Station database. This database is a geographic data set containing Amtrak intercity railroad...

  17. Integrated plant safety assessment: systematic evaluation program. Oyster Creek nuclear generating station. GPU Nuclear Corporation and Jersey Central Power and Light Company. Docket No. 50-219

    International Nuclear Information System (INIS)

    1982-09-01

    The Systematic Evaluation Program was initiated in February 1978 by the US Nuclear Regulatory Commission to review the designs of older operating nuclear reactor plants to reconfirm and document their safety. The review provides (1) an assessment of how these plants compare with current licensing safety requirements relating to selected issues, (2) a basis for deciding on how these differences should be resolved in an integrated plant review, and (3) a documented evaluation of plant safety. This report documents the review of the Oyster Creek Nuclear Generating Station (located in Ocean County, New Jersey), one of ten plants reviewed under Phase II of this program, and indicates how 137 topics selected for review under Phase I of the program were addressed. Equipment and procedural changes have been identified as a result of the review. It is expected that this report will be one of the bases in considering the issuance of a full-term operating license in place of the existing provisional operating license

  18. Microbial Challenge Testing of Single Liquid Cathode Feed Water Electrolysis Cells for the International Space Station (ISS) Oxygen Generator Assembly (OGA)

    Science.gov (United States)

    Roy, Robert J.; Wilson, Mark E.; Diderich, Greg S.; Steele, John W.

    2011-01-01

    The International Space Station (ISS) Oxygen Generator Assembly (OGA) operational performance may be adversely impacted by microbiological growth and biofilm formation over the electrolysis cell membranes. Biofilms could hinder the transport of water from the bulk fluid stream to the membranes and increase the cell concentration overpotential resulting in higher cell voltages and a shorter cell life. A microbial challenge test was performed on duplicate single liquid-cathode feed water electrolysis cells to evaluate operational performance with increasing levels of a mixture of five bacteria isolated from ISS and Space Shuttle potable water systems. Baseline performance of the single water electrolysis cells was determined for approximately one month with deionized water. Monthly performance was also determined following each inoculation of the feed tank with 100, 1000, 10,000 and 100,000 cells/ml of the mixed suspension of test bacteria. Water samples from the feed tank and recirculating water loops for each cell were periodically analyzed for enumeration and speciation of bacteria and total organic carbon. While initially a concern, this test program has demonstrated that the performance of the electrolysis cell is not adversely impacted by feed water containing the five species of bacteria tested at a concentration measured as high as 1,000,000 colony forming units (CFU)/ml. This paper presents the methodologies used in the conduct of this test program along with the performance test results at each level of bacteria concentration.

  19. Safety Evaluation Report related to the restart of Rancho Seco Nuclear Generating Station, Unit 1, following the event of December 26, 1985 (Docket No. 50-312)

    International Nuclear Information System (INIS)

    1987-10-01

    On December 26, 1985, the Rancho Seco Nuclear Generating Station, owned and operated by the Sacramento Municipal Utility District (SMUD), experienced a loss of dc power within the integrated control system (ICS) while the plant was at 76% power. The ensuing reactor trip was followed by a rapid overcooling transient and automatic initiation of the safety features actuation system (SFAS). The overcooling transient continued until ICS dc power was restored 26 minutes after its loss. Two letters from the NRC Region V Administrator (dated December 26, 1985) confirmed that the Rancho Seco plant would not be returned to power operation until SMUD (the licensee) had provided the NRC with an assessment of the root cause of the transient and a justification as to why the Rancho Seco facility is ready to resume power operation. In response, the licensee submitted the ''Rancho Seco Action Plan for Performance Improvement'' on July 3, 1986; revisions to that action plan were submitted on December 15, 1986 and February 28, 1987. The NRC staff has reviewed the action plan and numerous other supporting documents submitted by the licensee. The staff's evaluation of the information supporting restart of Rancho Seco is presented in this safety evaluation report

  20. Marble Hill Nuclear Generating Station, Units 1 and 2: Final environmental statement (Docket Nos. STN 50-546 and STN 50-547)

    International Nuclear Information System (INIS)

    1976-09-01

    The proposed action is the issuance of construction permits to the Public Service Company of Indiana, Inc., Northern Indiana Public Service Company, Inc., East Kentucky Power Cooperative, Inc., and Wabash Valley Power Association for the construction of the Marble Hill Nuclear Generating Station, Units 1 and 2 (MH 1and2). The 987-acre site is predominately forest and cropland. Construction-related activities on the site would disturb about 250 acres. The portion of this land not be used for the plant facilities, parking lots, roads, etc., will be restored by seeding and landscaping. The temporary removal of vegetation will tend to promote erosion. Increased siltation and turbidity can be expected in local streams during construction, but measures will be taken to minimize these effects. A maximum of 69 cfs of cooling water will be withdrawn from the Ohio River of which cfs will be returned to the river via pipeline with the dissolved solids concentration increased by a factor of about 6. About cfs will be evaporated to the atmosphere by the cooling towers. The volume of discharge (9 cfs) is very small compared with the river flow (annual mean is about 110,000 cfs) and the thermal effect on the river ecosystem is not expected to be significant. Chemical discharges from the plant will be diluted to concentrations below those which might adversely affect aquatic biota. The risk associated with accidental radiation exposure will be very low. 43 figs., 115 tabs

  1. Safety evaluation report related to the operation of Limerick Generating Station, Units 1 and 2 (Docket Nos. 50-352 and 50-353)

    International Nuclear Information System (INIS)

    1989-06-01

    In August 1983 the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-0991) regarding the application of the Philadelphia Electric Company (the licensee) for licenses to operate the Limerick Generating Station, Units 1 and 2, located on site in Montgomery and Chester Counties, Pennsylvania. Supplement 1 to NUREG-0991 was issued in December 1983. Supplements 2 and 3 were issued in October 1984. License NPF-27 for the low-power operation of Limerick Unit 1 was issued on October 26, 1984. Supplement 4 was issued in May, 1985, Supplement 5 was issued in July 1985, and Supplement 6 was issued in August 1985. These supplements addressed further issues that required resolution before Unit 1 proceeded beyond the 5-percent power level. The full-power operating license for Limerick Unit 1 (NPF-39) was issued August 8, 1985, and the unit has completed two cycles of operation. Supplement 7 was issued April 1989 to address some of the few significant design differences between Units 1 and 2, the resolution of issues that remained open when the Unit 1 full-power license was issued and an assessment of some of the issues that required resolution before issuance of an operating license for Unit 2. This supplement addresses the remaining issues that required resolution before issuance of and operating license for Unit 2

  2. Integrated plant safety assessment: Systematic Evaluation Program, San Onofre Nuclear Generating Station, Unit 1 (Docket No. 50-206): Final report

    International Nuclear Information System (INIS)

    1986-12-01

    The Systematic Evaluation Program was initiated in February 1977 by the US Nuclear Regulatory Commission to review the designs of older operating nuclear reactor plants to reconfirm and document their safety. The review provides: (1) an assessment of how these plants compare with current licensing safety requirements relating to selected issues; (2) a basis for deciding on how these differences should be resolved in an integrated plant review; and (3) a documented evaluation of plant safety. This report documents the review of San Onofre Nuclear Generating Station, Unit 1, operated by Southern California Edison Company. The San Onofre plant is one of ten plants reviewed under Phase II of this program. This report indicates how 137 topics selected for review under Phase I of the program were addressed. Equipment and procedural changes have been identified as a result of the review. This report will be one of the bases in considering the issuance of a full-term operating license in place of the existing provisional operating license. This report also addresses the comments and recommendations made by the Advisory Committee on Reactor Safeguards in connection with its review of the draft report issued in April 1985

  3. DEEPWAVE Initial Investigation of Mesospheric Gravity Wave Signatures Generated by Variable Orographic Forcing Over Lauder Station (45°S). New Zealand

    Science.gov (United States)

    Criddle, N.; Taylor, M. J.; Pautet, P. D.; Zhao, Y.

    2014-12-01

    DEEPWAVE is a new international collaborative research program focused on identifying, characterizing, and predicting the generation and propagation of deeply propagating atmospheric gravity waves from the Earth's surface up to ̴100 km altitude and beyond. An extended series of coordinated airborne and ground-based measurements were recently conducted from New Zealand's South Island to investigate gravity wave forcing during the winter months when strong North-Westerly winds are known to generate gravity waves capable of penetrating well into the stratosphere. As part of this collaborative effort the Atmospheric Imaging Lab at Utah State University (USU) deployed and operated an Advanced Mesospheric Temperature Mapper (AMTM) at the National Institute for Water and Atmosphere (NIWA) Lauder research station, NZ (45°S 169°E). In the lee of the Southern Alps, Lauder is well positioned for measuring a broad spectrum of gravity waves launched from south island orography and from other meteorological sources. The AMTM is uniquely capable of mapping the wave-induced temperature perturbations to investigate the two-dimensional gravity wave field with high temporal ( ̴10 sec) and high temperature precision ( ̴1-2 K in 30 sec). High-quality infrared image measurements of the OH (3,1) band emission layer (altitude ̴ 87 km) were made nightly from May 31 to July 22, 2014. The DEEPWAVE program has been a resounding success and over 42 nights of data were obtained at Lauder with distinct mesospheric mountain wave signatures recorded there in OH intensity, and in temperatures for the first time. In this poster we provide a summary of the AMTM data set from Lauder, complemented by data from coincident airborne over-flights where appropriate, and we present initial results characterizing the mesopause gravity wave field under varying orographic forcings. We thank the NSF for sponsoring this research program.

  4. Prediction and modeling of the two-dimensional separation characteristic of a steam generator at a nuclear power station with VVER-1000 reactors

    Science.gov (United States)

    Parchevsky, V. M.; Guryanova, V. V.

    2017-01-01

    A computational and experimental procedure for construction of the two-dimensional separation curve (TDSC) for a horizontal steam generator (SG) at a nuclear power station (NPS) with VVER-reactors. In contrast to the conventional one-dimensional curve describing the wetness of saturated steam generated in SG as a function of the boiler water level at one, usually rated, load, TDSC is a function of two variables, which are the level and the load of SGB that enables TDSC to be used for wetness control in a wide load range. The procedure is based on two types of experimental data obtained during rated load operation: the nonuniformity factor of the steam load at the outlet from the submerged perforated sheet (SPS) and the dependence of the mass water level in the vicinity of the "hot" header on the water level the "cold" end of SG. The TDSC prediction procedure is presented in the form of an algorithm using SG characteristics, such as steam load and water level as the input and giving the calculated steam wetness at the output. The zoneby-zone calculation method is used. The result is presented in an analytical form (as an empirical correlation) suitable for uploading into controllers or other controls. The predicted TDSC can be used during real-time operation for implementation of different wetness control scenarios (for example, if the effectiveness is a priority, then the minimum water level, minimum wetness, and maximum turbine efficiency should be maintained; if safety is a priority, then the maximum level at the allowable wetness and the maximum water inventory should be kept), for operation of NPS in controlling the frequency and power in a power system, at the design phase (as a part of the simulation complex for verification of design solutions), during construction and erection (in developing software for personnel training simulators), during commissioning tests (to reduce the duration and labor-intensity of experimental activities), and for training.

  5. Pindar's Tenth Olympian and athlete-trainer pederasty.

    Science.gov (United States)

    Hubbard, Thomas

    2005-01-01

    The comparison of the adolescent boxer Hagesidamus and his trainer Ilas to Patroclus and Achilles in Pindar's Olympian 10.16-21 and the subsequent comparison of Hagesidamus to Ganymede in Olympian 10.99-105 suggest that the relationship was in some sense pederastic, particularly in the wake of Aeschylus' treatment of Achilles and Patroclus in these terms in Myrmidons. This possibility motivates a broader examination of the evidence for such relationships in fifth-century Greece. There is no doubt that the palaestra was a central locus for the formation of pederastic liaisons and that athletic nudity was integral to the esthetic construction of adolescent beauty. There is also no doubt that the trainer's position afforded him regular intimacy and close physical contact with boys; several Hellenistic texts take for granted the erotic opportunities connected with the position. The Solonian law presuming to protect pupils from such relationships, attested in Aeschines, was probably a late fifth-century development in reaction to their common occurrence in earlier generations. Evidence also exists for lovers acting as financial backers to boy athletes or as informal trainers. Some of the most intriguing evidence for the conflation of the trainer's and lover's roles can be found in red-figure vase painting of the late sixth and fifth centuries.

  6. Final environmental statement related to the proposed construction of Douglas Point Nuclear Generating Station, Units 1 and 2: (Docket Nos. 50-448 and 50-449)

    International Nuclear Information System (INIS)

    1976-03-01

    The proposed action is the issuance of construction permits to the Potomac Electric Power Company for the construction of the Douglas Point Nuclear Generating Station, Units 1 and 2, located in Charles County, Maryland. The exhaust steam will be cooled via a closed-cycle mode incorporating natural-draft wet cooling towers. The water used in the cooling system will be obtained from the Potomac River. Construction-related activities on the site will convert about 290 acres of the 1390 acres of forested land at the Douglas Point site to industrial use. In addition to acreage at the site, approximately 4.5 miles of transmission corridor will require about 211 acres of land for rights-of-way. This corridor will connect with 27 miles of existing rights-of-way over which a line connecting Possum Point to Burches Hill has already been approved. The installation of new transmission line, uniquely identified with Douglas Point, along the existing right-of-way will involve approximately 464 additional acres. As described in the application, the maximum river water intake will be about 97,200 gpm. Of this, a maximum of about 28,000 gpm will be lost in drift or evaporation from the cooling towers. About 700 gpm maximum of fresh well water will be consumed. It is conservatively assumed that all aquatic organisms entrained in the service water system will be killed due to thermal and mechanical shock. It is further estimated that at 97,200 gpm maximum total river water intake, the maximum impact on the striped bass fishery will be a reduction of <5%. The risk associated with accidental radiation exposure is very low. 32 figs., 59 tabs

  7. Tenth Petryanov's and First Fuks's reading. Book of abstracts

    International Nuclear Information System (INIS)

    2015-01-01

    The Tenth Petryanov's and the First Fuks's reading took place in Moscow in April, 21-23, 2015. In the collection there are the abstracts of the reports deal with the investigations in the field of natural and anthropogenic, including radioactive, aerosols; current state and future of filtration processes; development and upgrading of electroforming technology of nano- and microfibrous materials; methods of aerosols investigation and analysis [ru

  8. Tenth national congress of the South African Society of Radiation Therapists

    International Nuclear Information System (INIS)

    1986-01-01

    The proceedings of the tenth national congress of the South African Society of Radiation Therapists are presented. Papers on the following topics were presented: gynaecological malignancies and oncology; pain and symptom control; radiobiology; radiotherapy of the head and neck; combined modality therapy, and lymphoma. Separate abstracts were prepared for thirty five of the papers presented. The remaining papers were considered outside the subject scope of INIS

  9. The chessgame: image, power and the church (late tenth-early twelfth century

    Directory of Open Access Journals (Sweden)

    Philippe Cordez

    2011-12-01

    Full Text Available The original in the East, the chessgame was adapted to the Western social and military realities since the tenth century. The codes for the exercise of feudal power were symbolized through the manipulation of its pieces. The analysis of four outside the realm of the chessgame, in the churches of Münster, Aachen, Saint-Denis and Reims, underlines the contribution of chess for the definition of the German Empire and of the French Kingdom.

  10. Tenth annual meeting, Vienna, Austria, 29 March - 1 April 1977. Summary report. Part III

    International Nuclear Information System (INIS)

    1977-11-01

    The Summary Report - Part III of the Tenth Annual Meeting of the IAEA International Working Group on Fast Reactors - contains the discussions on the commercial development of FBRs according to national plans, mostly related to technology problems of containment design, fuel fabrication, fuel failures, sodium pressure, fuel-sodium interaction, computer codes needed for licensing. Most of the discussions were related to the existing reactors: BN-600, BN-350, BN-1600, BOR-60, RAPSODIE, PHENIX

  11. Tenth working group meeting of representatives of RCA Member States. Report

    International Nuclear Information System (INIS)

    1989-04-01

    The Tenth RCA (Regional Co-operative Agreement for Research, Development and Training Related to Nuclear Science and Technology) Working Group meeting of representatives of RCA Member States was held at the Chinese Academy of Agricultural Sciences, Beijing, between 11-14 April 1988. The report on the meeting consists of a presentation of the seven technical sessions which dealt with topics such as nuclear techniques in industry, agriculture and medicine, nuclear power and of the project reports under RCA

  12. Shippingport Station Decommissioning Project

    International Nuclear Information System (INIS)

    McKernan, M.L.

    1989-01-01

    The Shippingport Atomic Power Station was located on the Ohio River in Shippingport Borough (Beaver County), Pennsylvania, USA. The US Atomic Energy Commission (AEC) constructed the plant in the mid-1950s on a seven and half acre parcel of land leased from Duquesne Light Company (DLC). The purposes were to demonstrate and to develop Pressurized Water Recovery technology and to generate electricity. DLC operated the Shippingport plant under supervision of (the successor to AEC) the Department of Energy (DOE)-Naval Reactors (NR) until operations were terminated on October 1, 1982. NR concluded end-of-life testing and defueling in 1984 and transferred the Station's responsibility to DOE Richland Operations Office (RL), Surplus Facility Management Program Office (SFMPO5) on September 5, 1984. SFMPO subsequently established the Shippingport Station Decommissioning Project and selected General Electric (GE) as the Decommissioning Operations Contractor. This report is intended to provide an overview of the Shippingport Station Decommissioning Project

  13. Palo Verde Nuclear Generating Station, Units 1, 2 and 3 (Docket Nos. STN 50-528, STN 50-529 and STN 50-530): Draft supplement to the Final environmental satement

    International Nuclear Information System (INIS)

    1975-11-01

    The proposed action is the issuance of construction permits to the Arizona Public Service Company for the construction of the Palo Verde Nuclear Generating Station, Units 1, 2, and 3. Preparation of the 3800-acre site will involve the clearing of up to 2500 acres of land, 1500 of which will be permanently devoted to station facilities. An additional 1200- to 1300-acre evaporation pond will ultimately be developed during the lifetime of the station. About 2200 site acres, previously devoted to agriculture, will be excluded from this land use. Soil disturbance during construction of the station, transmission lines, and water conveyance pipeline will tend to promote erosion and increase siltation in local ephemeral water courses. Stringent measures will be taken to minimize these effects. Station, transmission line, and water pipeline construction will kill, remove, displace, or otherwise disturb involved flora and fauna, and will eliminate varying amounts of wildlife breeding, nesting, and forage habitat. These will not be important permanent impacts to the population stability and structure of the involved local ecosystems of the Sonoran desert; however, measures will be taken to minimize such effects as do result from the proposed action. The pumping of groundwater will cause a local drawdown of about 1 ft/yr, less than that currently occurring; hence, the impact is considered acceptable. 1 fig., 20 tabs

  14. Station Capacity

    DEFF Research Database (Denmark)

    Landex, Alex

    2011-01-01

    the probability of conflicts and the minimum headway times into account. The last method analyzes how optimal platform tracks are used by examining the arrival and departure pattern of the trains. The developed methods can either be used separately to analyze specific characteristics of the capacity of a station...

  15. Technology and use of lignite. Proceedings of the tenth biennial lignite symposium

    Energy Technology Data Exchange (ETDEWEB)

    Kube, W. R.; Gronhovd, G. H. [comps.

    1979-01-01

    The symposium on the technology and use of lignite was sponsored by the US Department of Energy and the University of North Dakota, and held at Grand Forks, North Dakota, May 30-31, 1979. Twenty-one papers from the proceedings of this tenth biennial lignite symposium have been entered into EDB and ERA and three also into EAPA. The papers discuss lignite deposits in the USA, mining plans, gasification and in-situ gasification, and combustion in fossil-fuel power plants. (LTN)

  16. Eurex Euratom-CNEN agreement tenth annual report for the year 1974

    International Nuclear Information System (INIS)

    Calleri, G.; Dworschak, H.; Rolandi, G.

    1977-01-01

    This report covers the tenth year of activity in connection with the Eurex project since the signing of Euratom-CNEN Agreement no.001-64-11 RC-II for the construction, operation use for industrial research purposes of the Eurex plant. The report summarizes the contents of three four-monthly reports published during 1974 and presents a summary statement of expenditure. The report contains the following parts: management of the reprocessing division; planning and construction of the plant (modification); cold tests; laboratory and pilot-scale experiments prior to start-up of the plant; industrial operation of the plant

  17. Tenth annual conference of the CFD Society of Canada (CFD 2002). Proceedings

    International Nuclear Information System (INIS)

    Barron, R.M.

    2002-01-01

    The Tenth Annual Conference of the CFD Society of Canada, CFD 2002, was held in Windsor, Ontario from June 9-11, 2002. Contributions and participation were from many countries including Canada, United States, United Kingdom, France, Belgium, Germany, Iran, India, Pakistan, China, Japan, Singapore, Kuwait and Russia. The proceedings are a collection of the papers received covering the spectrum of computational fluid dynamics (CFD) from fundamental advances to improved algorithms to traditional and innovative applications. There is also a special session on automotive applications

  18. Proceedings of the Tenth Symposium of Atomic Energy Research. V. I

    International Nuclear Information System (INIS)

    Vidovszky, I.

    2000-10-01

    The present volume contains 80 papers, presented on the tenth Symposium of Atomic Energy Research, held in Moscow, Russia, 18-22 October 2000. The papers are presented in their original form, i. e. no corrections or modifications were carried out. The content of this volume is divided into thematic groups: Core Operation, Fuel Management and Design, Spectral and Core Calculation Methods, Spent Fuel, Transmutations, Core Monitoring, Surveillance and Testing, Neutron Kinetics and reactor Dynamics Methods, Safety Issues and Analysis, Rod Drop Reactivity Measurements, according to the presentation sequence on the Symposium

  19. Proceedings of the tenth Symposium of Atomic Energy Research. V. II

    International Nuclear Information System (INIS)

    Vidovszky, I.

    2000-10-01

    The present volume contains 80 papers, presented on the tenth Symposium of Atomic Energy Research, held in Moscow, Russia, 18-22 September 2000. The papers are presented in their original form, i. e. no corrections or modifications were carried out. The content of this volume is divided into thematic groups: Core Operation, Fuel Management and Design, Spectral and Core Calculation Methods, Spent Fuel, Transmutations, Core Monitoring, Surveillance and Testing, Neutron Kinetics and reactor Dynamics Methods, Safety Issues and Analysis, Rod Drop Reactivity Measurements, according to the presentation sequence on the Symposium

  20. Final supplement to the final environmental statement related to construction of Palo Verde Nuclear Generating Station Units 1, 2 and 3 (Docket Nos. STN 50-528, STN 50-529, and STN 50-530)

    International Nuclear Information System (INIS)

    1976-02-01

    The proposed action is the issuance of construction permits to the Arizona Public Service Company for the construction of the Palo Verde Nuclear Generating Station, Units 1, 2, and 3. Preparation of the 3800-acre site will involve the clearing of up to 2500 acres of land, 1500 of which will ultimately be developed during the lifetime of the station. About 2200 site acres, previously devoted to agriculture, will be excluded from this land use. Soil disturbance during construction of the station, transmission lines, and water conveyance pipeline will tend to promote erosion and increase siltation local ephemeral water courses. Stringent measures will be taken to minimize these effects (Sec. 4.5). Station, transmission line, and water pipeline construction will kill, remove, displace, or otherwise disturb involved flora and fauna, and will eliminate varying amounts of wildlife breeding, nesting, and forage habitat. These will not be important permanent impacts to the population stability and structure of the involved local ecosystems of the Sonoran desert; however, measures will be taken to minimize such effects as do results from the proposed action. 26 refs., 1 fig., 20 tabs

  1. ILRS Station Reporting

    Science.gov (United States)

    Noll, Carey E.; Pearlman, Michael Reisman; Torrence, Mark H.

    2013-01-01

    Network stations provided system configuration documentation upon joining the ILRS. This information, found in the various site and system log files available on the ILRS website, is essential to the ILRS analysis centers, combination centers, and general user community. Therefore, it is imperative that the station personnel inform the ILRS community in a timely fashion when changes to the system occur. This poster provides some information about the various documentation that must be maintained. The ILRS network consists of over fifty global sites actively ranging to over sixty satellites as well as five lunar reflectors. Information about these stations are available on the ILRS website (http://ilrs.gsfc.nasa.gov/network/stations/index.html). The ILRS Analysis Centers must have current information about the stations and their system configuration in order to use their data in generation of derived products. However, not all information available on the ILRS website is as up-to-date as necessary for correct analysis of their data.

  2. Idiopathic Ninth, Tenth, and Twelfth Cranial Nerve Palsy with Ipsilateral Headache: A Case Report

    Directory of Open Access Journals (Sweden)

    Sun Seung-Ho

    2012-12-01

    Full Text Available Objective: This case report is to report the effect of Korean traditional treatment for idiopathic ninth, tenth, and twelfth cranial nerve palsy with ipsilateral headache. Methods: The medical history and imaging and laboratory test of a 39-year-old man with cranial palsy were tested to identify the cause of disease. A 0.2-mL dosage of Hwangyeonhaedoktang pharmacopuncture was administered at CV23 and CV17, respectively. Acupuncture was applied at P06, Li05, TE05, and G37 on the right side of the body. Zhuapiandutongbang (左偏頭痛方 was administered at 30 minutes to 1 hour after mealtime three times a day. The symptoms were investigated using Visual Analogue Scale (VAS. Results: The results of magnetic resonance imaging (MRI, computed tomography (CT, and laboratory tests were normal. The medical history showed no trauma, other illnesses, family history of diseases, medications, smoking, drinking and so on. All symptoms disappeared at the 10th day of treatment. Conclusion: Korean traditional treatment such as acupuncture, pharmcopuncture, and herbal medicine for the treatment of ninth, tenth, and twelfth cranial nerve palsy of unknown origin is suggested to be effective even though this conclusion is based on a single.

  3. Safety evaluation report related to steam generator tube repair and return to operation Three Mile Island Nuclear Station, Unit No. 1 (Docket No. 50-289)

    International Nuclear Information System (INIS)

    Silver, H.

    1983-11-01

    Based on our evaluation of the steam generator tube repair method and of subsequent operation using the repaired steam generators, we conclude that the steam generator tube kinetic expansion process is acceptable, that applicable GDC have been met, and that there is reasonable assurance that the health and safety of the public will not be endangered by subsequent operation of the plant

  4. Socioeconomic impacts of nuclear generating stations: Nine Mile Point and Fitzpatrick case study. Technical report 1 Oct 78-4 Jan 82

    International Nuclear Information System (INIS)

    Branch, K.; Cochran, R.; Meale, R.

    1982-07-01

    The report documents a case study of the socioeconomic impacts of the construction and operation of the Nine Mile Point and Fitzpatrick nuclear power stations. It is part of a major post-licensing study of the socioeconomic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period, 1980-81. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study area during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socioeconomic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  5. Socioeconomic impacts of nuclear generating stations: Crystal River Unit 3 case study. Technical report 1 Oct 78-4 Jan 82

    International Nuclear Information System (INIS)

    Bergmann, P.A.

    1982-07-01

    The report documents a case study of the socioeconomic impacts of the construction and operation of the Crystal River Unit 3 nuclear power station. It is part of a major post-licensing study of the socioeconomic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period, 1980-81. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study area during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socioeconomic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  6. Safety Evaluation Report related to the operation of Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Docket Nos. STN 50-528, STN 50-529, and STN 50-530)

    International Nuclear Information System (INIS)

    1984-10-01

    Supplement No. 6 to the Safety Evaluation Report for the application filed by Arizona Public Service Company, et al., for licenses to operate the Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Docket Nos. STN 50-528/529/530), located in Maricopa County, Arizona, has been prepared by the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission. The purpose of this supplement is to update the Safety Evaluation Report by providing an evaluation of (1) additional information submitted by the applicant since Supplement No. 5 was issued and (2) matters that the staff had under review when Supplement No. 5 was issued

  7. Safety Evaluation Report related to the operation of Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Docket Nos. STN 50-528, STN 50-529, and STN 50-530). Supplement No. 7

    International Nuclear Information System (INIS)

    1984-12-01

    Supplement No. 7 to the Safety Evaluation Report for the application filed by Arizona Public Service Company et al. for licenses to operate the Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Docket Nos. STN 50-528/529/530), located in Maricopa County, Arizona, has been prepared by the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission. The purpose of this supplement is to update the Safety Evaluation Report by providing an evaluation of: (1) additional information submitted by the applicant since Supplement No. 6 was issued; and (2) matters that the staff had under review when Supplement No. 6 was issued

  8. Framing the Tenth Anniversary of 9/11:  A Comparison of CNN and Phoenix TV commemorative websites

    OpenAIRE

    Zhuang, Yuxi

    2013-01-01

    It has been more than ten years since the 9/11 attacks in 2001, but the events related to the attacks are still a focus for the whole world. This study examined the news coverage of the 9/11 tenth anniversary from Phoenix TV and CNN, which are among the most influential news media in China and the U.S., respectively. A systematic content analysis was performed using latest news, opinion articles, photographs, and videos as classified by CNN and Phoenix TV on their commemorative 9/11 tenth ann...

  9. Promoting Tenth Graders’ Reading Comprehension of Academic Texts in the English Class

    Directory of Open Access Journals (Sweden)

    Claudia Quiroga Carrillo

    2010-10-01

    Full Text Available This article reports on an action research project conducted in a public school in Bogotá, Colombia, with tenth grade students. We decided to develop it because of the students' needs as well as the emphasis of the PEI (Proyecto Educativo Institucional = School Institutional Project, which is based on the requisite of improving reading comprehension. The project focused on the implementation of four lesson plans in which five reading strategies were applied. They were reading speed, non-text information, word attack skills, text attack and discursive strategies. Data collection was conducted by using observation, journals, interviews and questionnaires. These instruments provided information about the level of improvement in reading comprehension and evidenced advances in the students' performance when they read an academic text in English.

  10. Proposed amendments to the tenth edition of the staff rules and regulations

    CERN Document Server

    1999-01-01

    The implementation of the tenth edition of the Staff Rules and Regulations on 1st January 1996 has highlighted the need for certain drafting amendments, now presented in this document. These initial proposed amendments are presented independently of any changes which might arise from the five-yearly review of the financial conditions of the members of the personnel currently in progress. In accordance with Articles VII 1.07 and 1.08 of the Staff Rules, the proposals set out below have been the subject of discussion within the Standing Concertation Committee. These modifications to the Staff Regulations have been discussed in TREF at its twenty-eighth and twenty-ninth meetings. They are submitted by the Management to Finance Committee for examination and approval, to take effect on 1st January 2000.

  11. Ionosonde Stations

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Ionograms are recorded tracings of reflected high frequency radio pulses generated by an ionosonde. Unique relationships exist between the sounding frequency and the...

  12. Revised and improved value of the QED tenth-order electron anomalous magnetic moment

    Science.gov (United States)

    Aoyama, Tatsumi; Kinoshita, Toichiro; Nio, Makiko

    2018-02-01

    In order to improve the theoretical prediction of the electron anomalous magnetic moment ae we have carried out a new numerical evaluation of the 389 integrals of Set V, which represent 6,354 Feynman vertex diagrams without lepton loops. During this work, we found that one of the integrals, called X 024 , was given a wrong value in the previous calculation due to an incorrect assignment of integration variables. The correction of this error causes a shift of -1.26 to the Set V contribution, and hence to the tenth-order universal (i.e., mass-independent) term A1(10 ). The previous evaluation of all other 388 integrals is free from errors and consistent with the new evaluation. Combining the new and the old (excluding X 024 ) calculations statistically, we obtain 7.606 (192 )(α /π )5 as the best estimate of the Set V contribution. Including the contribution of the diagrams with fermion loops, the improved tenth-order universal term becomes A1(10 )=6.675 (192 ) . Adding hadronic and electroweak contributions leads to the theoretical prediction ae(theory)=1 159 652 182.032 (720 )×10-12 . From this and the best measurement of ae, we obtain the inverse fine-structure constant α-1(ae)=137.035 999 1491 (331 ) . The theoretical prediction of the muon anomalous magnetic moment is also affected by the update of QED contribution and the new value of α , but the shift is much smaller than the theoretical uncertainty.

  13. Electric Power Plants and Generation Stations, File name = UTILITIES - PARTIAL Data is incomplete. Contains electric trans lines, electric substations, sewer plants, sewer pumpstations, water plants, water tanks http://www.harfordcountymd.gov/gis/Index.cfm, Published in 2011, 1:2400 (1in=200ft) scale, Harford County Government.

    Data.gov (United States)

    NSGIC Local Govt | GIS Inventory — Electric Power Plants and Generation Stations dataset current as of 2011. File name = UTILITIES - PARTIAL Data is incomplete. Contains electric trans lines, electric...

  14. Upgradation in N2 gas station for TLD personnel monitoring using gas based semi-automatic badge readers- installation and integration of N2 gas generator plant to the system and its performance appraisal

    International Nuclear Information System (INIS)

    Presently Personnel Monitoring against external radiation is being carried out using CaSO 4 :Dy phosphor based TLD badge and hot N 2 gas based semiautomatic TLD Badge Reader (TLDBR-7B). This system requires the supply of high purity N 2 gas for the operation of the reader. This gas is normally obtained from N 2 gas cylinders use of which is a cumbersome, tedious, cost intensive and involves safety hazards. To minimize the dependence on conventional gas cylinders, a medium sized plant for generation of N 2 gas directly from air has been installed and coupled to gas station and distribution system. The paper describes the comparative study of performance of TLD reading system using gas from the generator with that using gas cylinders, which has been found to be quite comparable. This upgradation has helped in drastic reduction in cost, labour and improved safety in TLD Laboratory working. (author)

  15. Complementary cold water production for a dairy industry: the use of biogas generated in the effluent treatment station; Producao de agua gelada complementar para um laticinio: o uso do biogas produzido na estacao de tratamento de efluentes

    Energy Technology Data Exchange (ETDEWEB)

    Villela, I.A.C. [Faculdade de Engenharia Quimica de Lorena, SP (Brazil). Dept. de Matematica Aplicada]. E-mail: iraides@debas.faenquil.br; Napoleao, D.A.S.; Silveira, J.L. [UNESP, Guaratingueta, SP (Brazil). Dept. de Energia]. E-mails: diovana@feg.unesp.br; joseluz@feg.unesp.br

    2000-07-01

    In this paper is analysed the possibility energetic utilization of biogas in the effluent treatment station of a medium dairy industry located in Sao Paulo state, Brazil. In this station is produced about 80 N m3/h of biogas, with a molar composition of 62,5% of CH{sub 4}, 13,4% of N{sub 2}, 5% of CO, 2,4% of CO{sub 2}, 2,4% of steam H{sub 2}O e 14,1% of H{sub 2}S. The generated biogas is today burning in a flair, according the national rule, with evident losses of energetic utilization potential.. The purpose of this paper is the direct utilization of this biogas to run an absorption refrigeration system utilizing H{sub 2}O + NH{sub 3} mixture. The level of H{sub 2}S in the biogas permits the energy recovery of the available heating minimum temperature level up to 230 deg C, according to the pinch point proceeding.This potential of energy recovery permits a complementation of the cold water production (7,3 kg/s) at 1 deg C. So, is made the energetic analysis of the proposed installation showing the technical feasibility of the actual use of the generated biogas, to produce useful energy. (author)

  16. Results of Steam-Water-Oxygen Treatment of the Inside of Heating Surfaces in Heat-Recovery Steam Generators of the PGU-800 Power Unit at the Perm' District Thermal Power Station

    Science.gov (United States)

    Ovechkina, O. V.; Zhuravlev, L. S.; Drozdov, A. A.; Solomeina, S. V.

    2018-05-01

    Prestarting, postinstallation steam-water-oxygen treatment (SWOT) of the natural circulation/steam reheat heat-recovery steam generators (HRSG) manufactured by OAO Krasny Kotelshchik was performed at the PGU-800 power unit of the Perm District Thermal Power Station (GRES). Prior to SWOT, steam-oxygen cleaning, passivation, and preservation of gas condensate heaters (GCH) of HRSGs were performed for 10 h using 1.3MPa/260°C/70 t/h external steam. After that, test specimens were cut out that demonstrated high strength of the passivating film. SWOT of the inside of the heating surfaces was carried out during no-load operation of the gas turbine unit with an exhaust temperature of 280-300°C at the HRSG inlet. The steam turbine was shutdown, and the generated steam was discharged into the atmosphere. Oxygen was metered into the discharge pipeline of the electricity-driven feed pumps and downcomers of the evaporators. The behavior of the concentration by weight of iron compounds and the results of investigation of cutout specimens by the drop or potentiometric method indicate that the steam-water-oxygen process makes it possible to remove corrosion products and reduce the time required to put a boiler into operation. Unlike other processes, SWOT does not require metal-intensive cleaning systems, temporary metering stations, and structures for collection of the waste solution.

  17. Robotic dissolution station

    Energy Technology Data Exchange (ETDEWEB)

    Beugelsdijk, T.J.; Hollen, R.M.; Temer, D.J.; Haggart, R.J.; Erkkila, T.H.

    1991-12-31

    This invention is comprised of a robotic station for dissolving active metals in acid in an automated fashion. A vessel with cap, containing the active metal is placed onto a shuttle which retracts to a point at which it is directly beneath a cap removing and retaining mechanism. After the cap is removed, a tube carrying an appropriate acid is inserted into the vessel, and the acid is introduced. The structure of the station forms an open hood which is swept of gases generated by the dissolution and the air removed to a remote location for scrubbing. After the reaction is complete, the shuttle extends and the vessel may be removed by a robot arm.

  18. The Effect of Using Cooperative Learning Method on Tenth Grade Students' Learning Achievement and Attitude towards Biology

    Science.gov (United States)

    Rabgay, Tshewang

    2018-01-01

    The study investigated the effect of using cooperative learning method on tenth grade students' learning achievement in biology and their attitude towards the subject in a Higher Secondary School in Bhutan. The study used a mixed method approach. The quantitative component included an experimental design where cooperative learning was the…

  19. A Longitudinal Investigation of Direct and Indirect Links between Reading Skills in Kindergarten and Reading Comprehension in Tenth Grade

    Science.gov (United States)

    Stanley, Christopher T.; Petscher, Yaacov; Catts, Hugh

    2018-01-01

    In this study, researchers examined the extent to which several fundamental measures of reading proficiency from kindergarten students (N = 3180) were linked to reading comprehension in tenth grade while controlling for third grade vocabulary and oral reading fluency. Analyses tested the direct and indirect relations between and among…

  20. Latent Profiles of Reading and Language and Their Association with Standardized Reading Outcomes in Kindergarten through Tenth Grade

    Science.gov (United States)

    Foorman, Barbara R.; Petscher, Yaacov; Stanley, Christopher; Truckenmiller, Adrea

    2017-01-01

    The objective of this study was to determine the latent profiles of reading and language skills that characterized 7,752 students in kindergarten through tenth grade and to relate the profiles to norm-referenced reading outcomes. Reading and language skills were assessed with a computer-adaptive assessment administered in the middle of the year…

  1. Once upon a Time. . . at the Tenth SOBRAMFA International and Academic Meeting--S. Paulo--Brazil

    Science.gov (United States)

    De Benedetto, Maria Auxiliadora C.; Blasco, Pablo G.; de Castro, Ariane G.; de Carvalho, Elsi

    2006-01-01

    In Brazil, medical practice and the predominant medical education model are based on specialization. Methodologies such as patient-centered medicine and narrative medicine are either unknown or not applied in a systematic way. In order to draw students' and doctors' attention to these approaches during the TENTH SOBRAMFA INTERNATIONAL AND ACADEMIC…

  2. A Dominance Analysis Approach to Determining Predictor Importance in Third, Seventh, and Tenth Grade Reading Comprehension Skills

    Science.gov (United States)

    Tighe, Elizabeth L.; Schatschneider, Christopher

    2014-01-01

    The purpose of the present study was to investigate and rank order by importance the contributions of various cognitive predictors to reading comprehension in third, seventh, and tenth graders. An exploratory factor analysis revealed that for third grade, the best fit was a four-factor solution including fluency, verbal reasoning, nonverbal…

  3. Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Docket Nos. STN 50-528, STN 50-529, and STN 50-530): Final environmental statement

    International Nuclear Information System (INIS)

    1982-02-01

    The proposed action is the issuance of operating licenses to the Arizona Public Service Company (APS, applicant) for the startup and operation of PVNGS, Units 1, 2, and 3, located in Maricopa County, about 24 km (15 mi) west of Buckeye, Arizona. The information in this statement represents the second assessment of the environmental impact associated with PVNGS Units 1, 2, and 3 pursuant to the guidelines of the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations (10 CFR) Part 51 of the Commissions's Regulations. After receiving an application in July 1974 to construct this station, the staff carried out a review of impacts that would occur during its construction and operation. That evaluation was issued as a Final Environmental Statement/emdash/Construction Phase (FES-CP). After this environmental review, a safety review, an evaluation by the Advisory Committee on Reactor Safeguards, and public hearings in Phoenix, Arizona, the US Nuclear Regulatory Commission issued Construction Permits Nos. CPPR-141, CPPR-142, and CPPR-143 for the construction of PVNGS Units 1, 2, and 3. As of September 1981, the construction of Unit 1 was about 92 percent complete, Unit 2 was 68 percent complete, and Unit 3 was 26 percent complete. 11 figs., 21 tabs

  4. A reagentless technology to prevent biofouling on the surfaces of equipment at nuclear and thermal power stations using generators of OH radicals and ozone

    Science.gov (United States)

    Izyumov, S. V.; Shchekotov, E. Yu.; Shchekotov, D. E.; Krutskikh, D. A.

    2011-07-01

    We present the results obtained from the development and tests of a reagentless method to prevent biofouling in water cooling systems of equipment using generators of OH radicals and ozone constructed on the basis of impulse ultraviolet xenon lamps producing light with a wavelength of 172 nm.

  5. Boxberg III-2 x 500 MW units: Refurbishing and environmental protection measures on the 815 T/H steam generator of works II in Boxberg Power Station

    Energy Technology Data Exchange (ETDEWEB)

    Cossman, R.; Fritz, M.; Bauchmueller, R. [L& C Steinmueller GmbH, Gummersbach (Germany)

    1995-12-01

    The object of the upgrading measures on the steam generators is: (1) To comply with the requirements of the German antipollution law, which imposes a permissible NO{sub x} content in the flue gas of less than 200 Mg/m{sup 3} STP and a CO content of less than 250 Mg/m{sup 3} STP. (2) To increase the boiler efficiency and availability and the efficiency of the water/steam cycle.

  6. Association of Exposure to Radio-Frequency Electromagnetic Field Radiation (RF-EMFR) Generated by Mobile Phone Base Stations with Glycated Hemoglobin (HbA1c) and Risk of Type 2 Diabetes Mellitus.

    Science.gov (United States)

    Meo, Sultan Ayoub; Alsubaie, Yazeed; Almubarak, Zaid; Almutawa, Hisham; AlQasem, Yazeed; Hasanato, Rana Muhammed

    2015-11-13

    Installation of mobile phone base stations in residential areas has initiated public debate about possible adverse effects on human health. This study aimed to determine the association of exposure to radio frequency electromagnetic field radiation (RF-EMFR) generated by mobile phone base stations with glycated hemoglobin (HbA1c) and occurrence of type 2 diabetes mellitus. For this study, two different elementary schools (school-1 and school-2) were selected. We recruited 159 students in total; 96 male students from school-1, with age range 12-16 years, and 63 male students with age range 12-17 years from school-2. Mobile phone base stations with towers existed about 200 m away from the school buildings. RF-EMFR was measured inside both schools. In school-1, RF-EMFR was 9.601 nW/cm² at frequency of 925 MHz, and students had been exposed to RF-EMFR for a duration of 6 h daily, five days in a week. In school-2, RF-EMFR was 1.909 nW/cm² at frequency of 925 MHz and students had been exposed for 6 h daily, five days in a week. 5-6 mL blood was collected from all the students and HbA1c was measured by using a Dimension Xpand Plus Integrated Chemistry System, Siemens. The mean HbA1c for the students who were exposed to high RF-EMFR was significantly higher (5.44 ± 0.22) than the mean HbA1c for the students who were exposed to low RF-EMFR (5.32 ± 0.34) (p = 0.007). Moreover, students who were exposed to high RF-EMFR generated by MPBS had a significantly higher risk of type 2 diabetes mellitus (p = 0.016) relative to their counterparts who were exposed to low RF-EMFR. It is concluded that exposure to high RF-EMFR generated by MPBS is associated with elevated levels of HbA1c and risk of type 2 diabetes mellitus.

  7. Association of Exposure to Radio-Frequency Electromagnetic Field Radiation (RF-EMFR Generated by Mobile Phone Base Stations with Glycated Hemoglobin (HbA1c and Risk of Type 2 Diabetes Mellitus

    Directory of Open Access Journals (Sweden)

    Sultan Ayoub Meo

    2015-11-01

    Full Text Available Installation of mobile phone base stations in residential areas has initiated public debate about possible adverse effects on human health. This study aimed to determine the association of exposure to radio frequency electromagnetic field radiation (RF-EMFR generated by mobile phone base stations with glycated hemoglobin (HbA1c and occurrence of type 2 diabetes mellitus. For this study, two different elementary schools (school-1 and school-2 were selected. We recruited 159 students in total; 96 male students from school-1, with age range 12–16 years, and 63 male students with age range 12–17 years from school-2. Mobile phone base stations with towers existed about 200 m away from the school buildings. RF-EMFR was measured inside both schools. In school-1, RF-EMFR was 9.601 nW/cm2 at frequency of 925 MHz, and students had been exposed to RF-EMFR for a duration of 6 h daily, five days in a week. In school-2, RF-EMFR was 1.909 nW/cm2 at frequency of 925 MHz and students had been exposed for 6 h daily, five days in a week. 5–6 mL blood was collected from all the students and HbA1c was measured by using a Dimension Xpand Plus Integrated Chemistry System, Siemens. The mean HbA1c for the students who were exposed to high RF-EMFR was significantly higher (5.44 ± 0.22 than the mean HbA1c for the students who were exposed to low RF-EMFR (5.32 ± 0.34 (p = 0.007. Moreover, students who were exposed to high RF-EMFR generated by MPBS had a significantly higher risk of type 2 diabetes mellitus (p = 0.016 relative to their counterparts who were exposed to low RF-EMFR. It is concluded that exposure to high RF-EMFR generated by MPBS is associated with elevated levels of HbA1c and risk of type 2 diabetes mellitus.

  8. Conventional and intelligent generalized supervisory control for combined cycle generating power stations.; Control supervisiorio generalizado convencional e inteligente para centrales de generacion de ciclo combinado

    Energy Technology Data Exchange (ETDEWEB)

    Martinez M, Miguel A; Sanchez P, Marino [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico); Gonzalez Rubio S, Jose L [Cento Nacional de Investigacion y Desarrollo Tecnologico (Cenidet), Cuernavaca, Morelos (Mexico)

    2005-07-01

    Under the expectations of expansion of electric power generation in Mexico, this work exposes the development of a conventional and intelligent generalized supervisory control (CSG) for a combined cycle generation power plant. This one allows to obtain the optimal operation of the power plant through the automatic starting of the generating units and to obtain the maximum possible amount of electrical power in automatic and safe form. For the development of the CSG a control loop by temperature was implemented for the gas turbine system and a control loop by strangled pressure for the gas turbine and a control loop by strangled pressure for the steam turbine. The design of these supervisory systems was made with base in the critical limits on the involved variables of the process: blading average temperature, for the gas turbine (GT) and strangled pressure for the steam turbine (ST) [Spanish] Bajo estas expectativas de expansion de generacion de energia en Mexico, este trabajo expone el desarrollo de un control supervisorio generalizado (CSG) para una central generacion de ciclo combinado. Este permite lograr la operacion optima de la planta a traves del arranque automatico de las unidades generadoras y obtener la maxima cantidad posible de potencia electrica en forma automatica y segura. Para el desarrollo del CSG se implanto un lazo de control por temperatura para el sistema de turbina de gas y un lazo de control por presion estrangulada para la turbina de gas y un lazo de control por presion estrangulada para la turbina de vapor. El diseno de estos sistemas supervisorio se realizo con base en los limites criticos de las variables del proceso involucradas: temperatura promedio de empaletado para la turbina de gas (TG) y presion estrangulada para la turbina de vapor (TV)

  9. Advances in power station construction

    International Nuclear Information System (INIS)

    Anon.

    1986-01-01

    This book is about power stations - specifically about the construction of modern power stations by the Central Electricity Generating Board in England and Wales over the past decade. It describes the work of the CEGB's Generation Development and Construction Division, perhaps better known throughout the world as simply 'Barnwood' where it has its Headquarters in Gloucester, UK. Barnwood was formed in the early 1970s to concentrate the CEGB's then dispersed engineering construction resources to cope with the smaller number but greatly increased size and complexity of modern power station projects. Perhaps uniquely over the ten years since its formation Barnwood has managed the construction of all types of station; coal-fired, oil-fired, nuclear, pumped storage and hydro. This book tells the story of these various projects and gives detailed descriptions of the respective stations. However, it is not intended as a comprehensive description of power station technology. Rather it is intended to convey the scale of such projects and the many decisions and compromises which have to be made in the course of managing their construction

  10. Prediction for the high-level alpha-active waste to be generated by nuclear power stations in the Member States of the European Communities

    International Nuclear Information System (INIS)

    Schmidt, E.

    1977-04-01

    Starting with a forecast for the nuclear power generating capacity to be installed in the Member States of the European Communities before the end of this century, a prediction is made of the annual production of high-level alpha-active waste from reprocessing plants and the corresponding accumulation up to the year 2000. The isotopic composition of the alpha-active waste from individual reactor types was calculated and an estimation of the influence of recycling plutonium through light water reactors on the produced quantity of higher actinides is made

  11. DEVELOPING ONLINE READING SUPPLEMENTARYMATERIALSFOR THE TENTH GRADERS OF SMAN 3 PROBOLINGGO

    Directory of Open Access Journals (Sweden)

    Reny Windi Astuti

    2017-04-01

    Full Text Available Reading is very important in learning a foreign language. Reading is also the interaction between reader and text. As the hardest skill for foreign language learners, reading requires rich background and knowledge of the language. Curriculum 2013 strongly suggeststhe teachers and students use textbook which government has developed. The researchers findthat English for the tenth graders does not have adequate reading materials. Based on the need analysis done by the researcher, the teacher has to add some other materials outside of the book to accommodate students in learning reading. Therefore, there should be adequate reading materials for English language learners. The purpose of this research was to develop online reading supplementary material based on curriculum 2013 that could be useful for English teachers. This study was carried toR&D (Research and Development. This paper presented; (1 supplementary materials which could be used by the students through online based, and (2 how to develop online reading supplementary materials. By considering these theories, it is hoped that the teachers and scholars can have theoretical insight in developing online reading supplementary materials.

  12. Tenth Negotiators' Standing Sub-Group (NSSG-10) and related meetings

    International Nuclear Information System (INIS)

    Drew, M.

    2003-01-01

    The Tenth Meeting of the ITER Negotiators' Standing Sub-Group (NSSG-10) and related meetings were held during the period 18-27 September 2003 at Culham, UK, at the kind invitation of UKAEA-Euratom, who placed their JET meeting facilities at the disposal of the Sub-Group and its Topical Working Groups. The European Union hosted the meeting, which was also attended by delegations from Canada, China, Japan, the Republic of Korea, the Russian Federation and the USA. The focussed discussion enabled further good progress to be made in developing the many different elements that will be involved in the joint implementation of ITER. In particular the discussions on procurement allocation reached the stage at which it was possible to charge the NSSG Moderator to transmit to the Participants at a high level an agreed proposed allocation among the Parties of responsibilities to procure and contribute in kind the various systems and components for ITER construction. The proposed allocation is well defined up to the current limits of understanding on cost sharing and includes areas of flexibility to allow a full matching to the definitive cost sharing as and when it is finally agreed

  13. Concrete for the construction of No. 1 nuclear power generator of Tokyo Denryoku Co.'s Kashiwazaki, Kariha nuclear power station

    International Nuclear Information System (INIS)

    Suzuki, Yasuyoshi; Eguchi, Kiyoshi; Nakakomi, Akira.

    1985-01-01

    The construction of the No.1 power generator of Kariha nuclear power generator was completed on March 1985, and the installations of equipments are on their way aiming the start in October 1960. About 900,000 m 3 of concrete was produced and used for whole work and about 500,000 m 3 out of total was used for the construction of plant building. For constructing reactor building and turbin building, the concrete must have shielding property against radiation. The specific gravity no less than 2.5 was required for dry state of laid concrete. In order to supply very large amount of concrete with stable quality, preliminary investigation on raw materials including aggregates, fly-ash and surface active agents, were made. Aggregates were stored in underground bins to keep the temperature constant for the purpose of obtaining mixed concrete with constant temperature. For determining the mixing rate of concrete, physical test such as slump test, determination of air content, determinations of strengths and specific gravities of solidified concrete. Quality control committee was established to observe the optimum condition, which were confirmed by preliminary tests, of concrete preparation. As the results of detailed preliminary investigation on respective raw material and strict quality control from the source of raw material to mixed concrete, the supply of concrete with stable quality which conforms every requirement of standard, was possible. (Ishimitsu, A.)

  14. Improvements in steam cycle thermal power stations

    International Nuclear Information System (INIS)

    1973-01-01

    The invention provides improvements in steam cycle thermal power stations. The power station adapted to supply a network with variable requirements, is according provided with a heat accumulator. A feed water re-heater using steam taken in the steam generator, is mounted downstream of the water-station. This arrangement permits to substantially increase the temperature of the water admitted into the steam generator and allows the accumulator to restore the heat accumulated at a higher-rate, at peak periods. This can be applied to power stations, the basic thermal source of which is adapted only to moderate working conditions [fr

  15. Safety Evaluation Report related to the operation of Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Docket Nos. STN 50-528, STN 50-529, and STN 50-530). Supplement No. 9

    International Nuclear Information System (INIS)

    1985-12-01

    Supplement No. 9 to the Safety Evaluation Report for the application filed by Arizona Public Service Company et al. for licenses to operate the Palo Verde Nuclear Generating Station, Units 1, 2 and 3 (Docket Nos. STN 50-528/529/530), located in Maricopa County, Arizona, has been prepared by the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission. The purpose of this supplement is to update the Safety Evaluation Report by providing an evaluation of: (1) additional information submitted by the applicant since Supplement No. 8 was issued; and (2) matters that the staff had under review when Supplement No. 8 was issued, specifically those issues which required resolution prior to Unit 2 fuel loading and testing up to 5% of full power

  16. Safety Evaluation Report related to the operation of Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Dockets Nos. STN 50-528, STN 50-529, and STN 50-530)

    International Nuclear Information System (INIS)

    1987-03-01

    Supplement No. 11 to the Safety Evaluation Report for the application filed by Arizona Public Service Company et al. for licenses to operate the Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Docket Nos. STN 50-528/529/530), located in Maricopa County, Arizone, has been prepared by the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission. The purpose of this supplement is to update the Safety Evaluation Report by providing an evaluation of (1) additional information submitted by the applicant since Supplement No. 10 was issued and (2) other matters requiring staff review since Supplenent No. 10 was issued, specifically those issues that required resolution before Unit 3 low-power licensing

  17. RF Environment Test on a Proposed Site for the Sensor Station of the Next Generation Satellite Navigation System, GALILEO: I. The Result of the Test on the Vicinity of KVN Tamla Site in the Year of 2006 by KASI

    Directory of Open Access Journals (Sweden)

    Jung Hyun Jo

    2008-03-01

    Full Text Available As the next generation of global satellite navigation system, the Galileo project is about to witness an initial orbit validation stage as the successful test of navigation message transmission from Giove-A in 2007. The Space Geodesy division and the Radio Astronomy division of the Korea Astronomy & Space Science Institute had collaborated on the field survey for the Galileo Sensor Station (GSS RF environment of the proposed site near Jeju Tamla University from August 3rd to August 5th, 2006. The power spectrums were measured in full-band (800 ˜ 2000 MHz and in-band (E5, E6 and L1 band in frequency domain for 24 hours respectively. Finally, we performed a time domain analysis to characterize strong in-band interference source based on the result of the previous step.

  18. LINK2009 Phase 1: Development of 2. generation fuel cell vehicles and hydrogen refueling station. Final report; LINK2009 fase 1: Udvikling af 2. gen. braendselscelle koeretoejer og brinttankstation. Slutrapport

    Energy Technology Data Exchange (ETDEWEB)

    2010-03-15

    LINK2009 project was to develop 2nd gen. technologies fuel cell systems for vehicles and 350bar hydrogen refueling stations. Also the LINK2009 project were to ensure a continuously positioning of Denmark and the Scandinavian Region within hydrogen for transport and continue to attract international car manufacturers to conduct demonstration and later market introduction in the region. The LINK2009 project is divided in two phases where this first phase only deals with the development of the 2nd generation technologies, whereas the following phase 2 will include the demonstration hereof as well as additional research activities. This Report describes the results of the phase 1 that was commenced in summer 2008 and ended in late 2009. Phase 1 has resulted in the development of new 2nd generation fuel cell technology for use in a city car and a service vehicle. Stated targets for price and efficiency have been reached and the following demonstration in Phase 2 is to confirm reaching of life time targets. The efficiency of the fuel cell system for the city car has been measured to be 42-48% at a power delivery of respectively 10kW and 2kW, which is significantly above the target of >40%. System simplifications and selection of new components have enabled a 50% reduction in the kW price for the fuel cell system, including 700bar hydrogen storage, now totalling Euro 4.500/kW. This creates sufficient basis for conducting demonstration of the system in vehicles. 9 vehicles are planned to be demonstrated in the following phase 2. Additional 8 vehicles were put in operation in Copenhagen in November 2009. Phase 1 has conducted development of 2nd gen. hydrogen refuelling technology that has resulted in concepts for both 350bar and 700bar refuelling as well as a concept for onsite hydrogen production at refuelling stations. In separate projects the developed 350bar technology has been brought to use in a newly established hydrogen station in Copenhagen, and the hydrogen

  19. Information system for data management of civil buildings instrumentation in generating power stations; Sistema de informacion para el manejo de datos de la instrumentacion de las obras civiles de las centrales generadoras

    Energy Technology Data Exchange (ETDEWEB)

    Alvarado, Alonso; Escamilla, Juan Carlos; Alaniz, Felipe de Jesus [Instituto de Investigaciones Electricas, Cuernavaca (Mexico); Gonzalez, Francisco; Mena, Enrique [Comision Federal de Electricidad, Mexico, D. F. (Mexico)

    1997-12-31

    A relevant task performed by Comision Federal de Electricidad (CFE) is the analysis of the structural behavior and safety assessment of the country`s large electric energy generating stations. This task is performed capturing, revising an analyzing the information generated by measuring instruments installed in the power station civil structures. Such activity generates a large amount of data and the collection, analysis and assessment is a long and tiresome process; additionally, the generated information is kept in plain isolated files, that causes sluggishness in the process and delays in the access to the information. This article describes the characteristics of the Information System for Structure Measurements (Sistema de Informacion de Medicion de Estructuras) (SIME), developed by the Instituto de Investigaciones Electricas (IIE) for CFE in order to enhance the opportunity for the information management. SIME captures, arranges, stores and reports the data obtained from the measurements at the works with great efficiency and flexibility. This system is part of another of greater scope with which CFE will ensure an optimum operation condition of its civil buildings. [Espanol] Una tarea relevante que realiza la Comision Federal de Electricidad (CFE) es analizar el comportamiento estructural y evaluar la seguridad de las grandes obras generadoras de energia electrica del pais. Esta tarea la realiza capturando, revisando y analizando la informacion que generan instrumentos de medicion instalados en las estructuras civiles de las centrales. Tal actividad genera gran cantidad de datos y el proceso de recopilacion, analisis y evaluacion es tardado y tedioso; ademas, la informacion que se genera se guarda en archivos planos aislados, lo que ocasiona lentitud en el proceso y retraso en el acceso a la informacion. Este articulo describe las caracteristicas del Sistema de Informacion de Medicion de Estructuras (SIME) desarrollado por el Instituto de Investigaciones

  20. Treasures ... of black wood, brilliantly polished : five examples of Taino sculpture from the tenth-sixteenth century Caribbean.

    Science.gov (United States)

    Joanna Ostapkowicz; Alex Wiedenhoeft; Christopher Bronk Ramsey; Erika Ribechini; Samuel Wilson; Fiona Brock; Tom Higham

    2011-01-01

    Five wooden sculptures from the pre-contact Caribbean, long held in museum collections, are here dated and given a context for the first time. The examples studied were made from dense Guaiacum wood, carved, polished and inlaid with shell fastened with resin. Dating the heartwood, sapwood and resins takes key examples of ‘Classic’ Ta´ýno art back to the tenth century...

  1. Resolution 369/012. It authorize to Vientos de Pastoral S.A. to generate a wind power electricity source by 150.0 MW generating station section, and their connection to National interconnected system

    International Nuclear Information System (INIS)

    2012-01-01

    It has been allowed the wind power generation electricity energy source as a the primary electricity source. This project was presented by the Vientos de Pastoral S.A company according to the opinion of the National Energy Regulatory Unit and the Energy and Water Services in relation with the requirements of the current rule

  2. A Dominance Analysis Approach to Determining Predictor Importance in Third, Seventh, and Tenth Grade Reading Comprehension Skills

    Science.gov (United States)

    Tighe, Elizabeth; Schatschneider, Christopher

    2015-01-01

    The purpose of the present study was to investigate and rank order by importance the contributions of various cognitive predictors to reading comprehension in third, seventh, and tenth graders. An exploratory factor analysis revealed that for third grade, the best fit was a four-factor solution including Fluency, Verbal Reasoning, Nonverbal Reasoning, and Working Memory factors. For seventh and tenth grade, three-factor solutions with Fluency, Reasoning, and Working Memory factors were the best fit. The three and four-factor models were used in separate dominance analyses for each grade to rank order the factors by predictive importance to reading comprehension. Results indicated that Fluency and Verbal Reasoning were the most important predictors of third grade reading comprehension. For seventh grade, Fluency and Reasoning were the most important predictors. By tenth grade, Reasoning was the most important predictor of reading comprehension. Working Memory was the least predictive of reading comprehension across all grade levels. These results suggest that inferential reasoning skills become an important contributor to reading comprehension at increasing grade levels. PMID:26346315

  3. Water pollution and thermal power stations

    International Nuclear Information System (INIS)

    Maini, A.; Harapanahalli, A.B.

    1993-01-01

    There are a number of thermal power stations dotting the countryside in India for the generation of electricity. The pollution of environment is continuously increasing in the country with the addition of new coal based power stations and causing both a menace and a hazard to the biota. The paper reviews the problems arising out of water pollution from the coal based thermal power stations. (author). 2 tabs

  4. Sources of the wind power stations

    International Nuclear Information System (INIS)

    Chudivani, J.; Huettner, L.

    2012-01-01

    The paper deals with problems of the wind power stations. Describes the basic properties of wind energy. Shows and describes the different types of electrical machines used as a source of electricity in the wind power stations. Shows magnetic fields synchronous generator with salient poles and permanent magnets in the program FEMM. Describes methods for assessing of reversing the effects of the wind power stations on the distribution network. (Authors)

  5. Guidelines for Learning Stations.

    Science.gov (United States)

    Fehrle, Carl C.; Schulz, Jolene

    Guidelines for designing and planning learning stations for pupils at the elementary grade level include suggestions on how to develop a station that will be successful in meeting the learners' needs. Instructions for the use of tapes at a station and matching pupils with stations are given, as are guidelines on classroom arrangement and record…

  6. Magic squares in the tenth century twoAarabic treatises by Anṭākī and Būzjānī

    CERN Document Server

    Sesiano, Jacques

    2017-01-01

    This volume contains the texts and translations of two Arabic treatises on magic squares, which are undoubtedly the most important testimonies on the early history of that science. It is divided into the three parts: the first and most extensive is on tenth-century construction methods, the second is the translations of the texts, and the third contains the original Arabic texts, which date back to the tenth century. .

  7. An updated review of the concept of eLearning. Tenth anniversary

    Directory of Open Access Journals (Sweden)

    Francisco José GARCÍA-PEÑALVO

    2015-04-01

    perspective of our research group GRIAL (Research Group in InterAction and eLearning, coinciding with the tenth anniversary of the “Current status of e-learning systems” paper.

  8. Local control stations

    International Nuclear Information System (INIS)

    Brown, W.S.; Higgins, J.C.; Wachtel, J.A.

    1993-01-01

    This paper describes research concerning the effects of human engineering design at local control stations (i.e., operator interfaces located outside the control room) on human performance and plant safety. The research considered both multifunction panels (e.g. remote shutdown panels) as well as single-function interfaces (e.g., valves, breakers, gauges, etc.). Changes in performance shaping factors associated with variations in human engineering at LCSs were estimated based on expert opinion. By means of a scaling procedure, these estimates were used to modify the human error probabilities in a PRA model, which was then employed to generate estimates of plant risk and scoping-level value/impact ratios for various human engineering upgrades. Recent documentation of human engineering deficiencies at single-function LCSs was also reviewed, and an assessment of the current status of LCSs with respect to human engineering was conducted

  9. Cables for nuclear power generating stations, (6)

    International Nuclear Information System (INIS)

    Kakuta, Tsunemi; Asakawa, Naoki; Yamamoto, Tomotaka; Watanabe, Mikio; Shingo, Yoshioki.

    1981-01-01

    New inorganic material insulated flexible triaxial cables have been developed for the purpose of applying around the primary circuit of fast breeder reactor (FBR). These cables were tested at high temperature and high #betta#-ray radiation environment, and they showed good electrical properties. Other noted results were that they showed good fire proof and flame resistant properties. (author)

  10. Point Lepreau Generating Station - 1995 SLAR program

    International Nuclear Information System (INIS)

    Baker, R.

    1996-01-01

    The Pt. Lepreau SLAR Program began after the successful use of the SLAR MKIII Tool during the 1993 Pt. Lepreau G.S. Maintenance outage. Preparations began immediately to assemble staff and equipment to complete a full core SLAR starting in April 1995. Installation and commissioning of the SLAR System at site began on March 29/95 and on reactor operations started on April 15/95. A total of 372 channels were visited with SLAR and all but 4 were dispositioned to the target life of 241, 500 Effective Full Power Hours. SLAR operations were completed on October 5/95 and within 7 days the Fuel Handling System was returned to pre-SLAR configuration and functionally tested. The SLAR Program was completed on schedule and within budget. (author)

  11. Water Level Station History

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Images contain station history information for 175 stations in the National Water Level Observation Network (NWLON). The NWLON is a network of long-term,...

  12. Fire Stations - 2009

    Data.gov (United States)

    Kansas Data Access and Support Center — Fire Stations in Kansas Any location where fire fighters are stationed or based out of, or where equipment that such personnel use in carrying out their jobs is...

  13. Fire Stations - 2007

    Data.gov (United States)

    Kansas Data Access and Support Center — Fire Station Locations in Kansas Any location where fire fighters are stationed at or based out of, or where equipment that such personnel use in carrying out their...

  14. Newport Research Station

    Data.gov (United States)

    Federal Laboratory Consortium — The Newport Research Station is the Center's only ocean-port research facility. This station is located at Oregon State University's Hatfield Marine Science Center,...

  15. Streamflow Gaging Stations

    Data.gov (United States)

    Department of Homeland Security — This map layer shows selected streamflow gaging stations of the United States, Puerto Rico, and the U.S. Virgin Islands, in 2013. Gaging stations, or gages, measure...

  16. Big Game Reporting Stations

    Data.gov (United States)

    Vermont Center for Geographic Information — Point locations of big game reporting stations. Big game reporting stations are places where hunters can legally report harvested deer, bear, or turkey. These are...

  17. Ocean Station Vessel

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Ocean Station Vessels (OSV) or Weather Ships captured atmospheric conditions while being stationed continuously in a single location. While While most of the...

  18. Hammond Bay Biological Station

    Data.gov (United States)

    Federal Laboratory Consortium — Hammond Bay Biological Station (HBBS), located near Millersburg, Michigan, is a field station of the USGS Great Lakes Science Center (GLSC). HBBS was established by...

  19. Reference Climatological Stations

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Reference Climatological Stations (RCS) network represents the first effort by NOAA to create and maintain a nationwide network of stations located only in areas...

  20. THE PRACTICE REHEARSAL PAIR STRATEGY TOWARDS STUDENTS’ SPEAKING ABILITY AT THE TENTH GRADE STUDENTS OF SMA N 2 LUBUK ALUNG

    OpenAIRE

    Reza, Thenzia Februa; Hayati, Amal; Widyawati, Siska Okta

    2017-01-01

    The purpose of this research was to find the effect of the application of Practice Rehearsal Pairs strategy Towards Students’ Speaking Ability At The Tenth Grade Students of SMAN 2 Lubuk Alung. This research is an experimental research. The population was all students in class X SMAN 2 Lubuk Alung school year 2015/2016. The samples selected were X1class as the experimental class and X3 class as the control class. The research was conducted for 8 meetings. The research began by providing treat...

  1. Explorations of Tenth-Grade STS[E] Curricula across Three Provincial Political Landscapes

    Science.gov (United States)

    Phillips, Christina Ann

    This thesis focuses on explorations of science, technology, society and the environment (i.e., STS[E]) outcomes/expectations in tenth-grade level science curricula across three Canadian provinces (i.e., Alberta, Manitoba & Ontario) with distinctive provincial political environments at the time of curriculum construction and/or implementation. Document analysis, discourse analysis and a range of theoretical frameworks (i.e., Levinson, 2010; Pedretti & Nazir, 2011 & Krathwohl, 2002) were used to aid in explorations of STS[E] curriculum segments and discourses in each provincial region. More detailed analysis and thematic exploration is presented for each unit associated with climate change as some interesting patterns emerged following initial analysis. My findings are presented as three comparative case studies and represent a small and original contribution to the large body of scholarly research devoted to studies of STS[E] education, where each province represents a unique case that has been explored regarding some aspects the STS[E] curriculum outcomes/expectations and general political culture as well as some other theoretical factors. Findings from this study indicate that Alberta's STS[E] outcomes may be related to Levinson's (2010) 'deliberative' citizenship focus. The following currents from Pedretti and Nazir (2011) appear to be emphasized: logical reasoning, historical, application & design and socio-cultural aligned outcomes when STS[E] is considered as an entity separate from the Alberta curriculum combination of STS and Knowledge. Ontario's STS[E] expectations may align with Levinson's (2010) 'deliberative' or in some select cases a 'deliberative'/'praxis' framework category with some emphasis related to logical reasoning and socio-cultural awareness (Pedretti & Nazir, 2011) in their STS[E] curriculum. The Manitoba STS[E] outcomes may be aligned with a more 'deliberative' approach with some associations that could intersect with the framework

  2. Stratus 10: Tenth Setting of the Stratus Ocean Reference Station. Cruise RB-10-01 January 2 - January 30, 2010 Charleston, South Carolina - Valparaiso, Chile

    Science.gov (United States)

    2010-05-01

    payed out to the next termination. The termination was stopped off using lines on cleats , and the hauling wire removed while the next instrument was...payed out. The end of the 200 m nylon was stopped off about 15 feet from the transom using a sling though the thimble. An H-bit cleat was positioned aft...and nylon on the winch drum were payed out, the end of the nylon was stopped off to a deck cleat . When the end of the polypropylene line was

  3. INTERACT Station Catalogue - 2015

    DEFF Research Database (Denmark)

    and research groups. Therefore, INTERACT has produced a catalogue of research stations including descriptions of the physical setting, facilities and services offered at the stations. It is our hope that this catalogue will help researchers identify research stations that suit their specific needs. The 2015......INTERACT stations are located in all major environmental envelopes of the Arctic providing an ideal platform for studying climate change and its impact on the environment and local communities. Since alpine environments face similar changes and challenges as the Arctic, the INTERACT network also...... includes some alpine stations located outside the Arctic. The INTERACT research stations provide an ideal platform for circumarctic research and monitoring. Activities span from small short term research projects to larger long term monitoring programmes. The stations are thus visited by many researchers...

  4. Applying a Multiple Group Causal Indicator Modeling Framework to the Reading Comprehension Skills of Third, Seventh, and Tenth Grade Students

    Science.gov (United States)

    Tighe, Elizabeth L.; Wagner, Richard K.; Schatschneider, Christopher

    2015-01-01

    This study demonstrates the utility of applying a causal indicator modeling framework to investigate important predictors of reading comprehension in third, seventh, and tenth grade students. The results indicated that a 4-factor multiple indicator multiple indicator cause (MIMIC) model of reading comprehension provided adequate fit at each grade level. This model included latent predictor constructs of decoding, verbal reasoning, nonverbal reasoning, and working memory and accounted for a large portion of the reading comprehension variance (73% to 87%) across grade levels. Verbal reasoning contributed the most unique variance to reading comprehension at all grade levels. In addition, we fit a multiple group 4-factor MIMIC model to investigate the relative stability (or variability) of the predictor contributions to reading comprehension across development (i.e., grade levels). The results revealed that the contributions of verbal reasoning, nonverbal reasoning, and working memory to reading comprehension were stable across the three grade levels. Decoding was the only predictor that could not be constrained to be equal across grade levels. The contribution of decoding skills to reading comprehension was higher in third grade and then remained relatively stable between seventh and tenth grade. These findings illustrate the feasibility of using MIMIC models to explain individual differences in reading comprehension across the development of reading skills. PMID:25821346

  5. Learning styles and types of multiple intelligences in dental students in their first and tenth semester. Monterrey, Mexico, 2015.

    Directory of Open Access Journals (Sweden)

    Juan Solís-Soto

    2016-04-01

    Full Text Available Introduction: Nowadays the incorporation and validation of learning styles and multiple intelligences enable teachers to obtain positive results in academic performance. This new approach has allowed to appreciate personal differences in dental students and strengthen their underdeveloped aspects, improving teaching and learning skills. Objective: To compare learning styles and multiple intelligences in a sample of Mexican dental students in their first and tenth semester. Materials and Methods: A cross-sectional study using questionnaires on learning styles (Honey-Alonso and Gardner’s multiple intelligences was performed. The study was applied to 123 students in their first semester and 157 in their tenth semester at the School of Dentistry at Universidad Autónoma de Nuevo León, evaluating differences between age and sex. Results: Logical-Mathematical intelligence (p=0.044 and Kinesthetic-Corporal intelligence (p=0.042 showed significant differences between students of both semesters, with intrapersonal and interpersonal intelligences being more prevalent. Within learning styles, the prevalent were Reflexive and Theoretical, showing a significant difference between semesters (p=0.005. Conclusion: The most prevalent learning styles in both groups were Reflexive and Theoretical, with no difference between both sexes. The most prevalent types of multiple intelligences in both sexes and groups were interpersonal and intrapersonal.

  6. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    Wilson, A.

    1982-11-01

    The methods of establishing construction time, capital cost, availability and lifetime of different types of generating plant are described. In volume one assessments are presented for a new coal fired station, for a new AGR station and for a new PWR station - Sizewell B. Volume two, contains all diagrams, tables and appendices presented as evidence. (U.K.)

  7. Stanwell power station project

    Energy Technology Data Exchange (ETDEWEB)

    Mills, David R; J Dey, Christopher [University of Sidney, Sidney (Australia); Morrison, Graham L [University of New South Wales, Sidney (Australia)

    2000-07-01

    This paper describes the Compact Linear Fresnel Reflector (CLFR) being developed for installation at the Stanwell power station in Queensland Australia. Stanwell Corporation Limited (SCL). Solahart International, Solsearch Pty. Ltd. And the universities of Sidney and New South Wales are cooperating in the project, and this first plant being partly funded by the Australian Greenhouse Office. The solar plant will be attached to a 1440 MW(e) coal fired plant. The 17000 m{sup 2} array will be the largest array in Australia, producing a peak of 13 MW of thermal energy which will offset the use of coal in the generation of electricity. It will use direct steam generation and will feed either steam or hot water at 265 Celsius degrees directly into the power station preheating cycle. The CLFR system, first developed by the University of Sidney and Solsearch Pty. Ltd., is simple and offers small reflector size, low structural cost, fixed receiver geometry. Initial installed plant costs are approximately US$1000 per kWe, but this includes the effect of high up-front design costs and the cost should drop substantially in the second and subsequent plants. [Spanish] Proyecto de la Planta Electrica Stanwell este articulo describe el Reflector Lineal Compacto Fresnel (CLFR, siglas en ingles) que se esta desarrollando para la instalacion de la planta electrica Stanwell en Queensland, Australia. La Corporacion Stanwell Limited (SCL), Solahart International, Solsearch Pty. Ltd., las universidades de Sidney y de New South Wales estan cooperando en este proyecto, y esta primera planta esta parcialmente auspiciada por la Australian Greenhouse Office. La planta solar sera anexa a una planta de carbon de 1440 MW(e). Este arreglo de 17000 m{sup 2} sera el mayor en Australia y producira un maximo de 13 MW en energia termica la cual contrarrestara el uso del carbon en la generacion de electricidad. Utilizara generacion con vapor directo y alimentara ya sea vapor o agua caliente a 265 grados

  8. PREFACE: Tenth International Conference on Topics in Astroparticle and Underground Physics (TAUP2007)

    Science.gov (United States)

    Inoue, Kunio; Suzuki, Atsuto; Mitsui, Tadao

    2008-07-01

    The tenth meeting of the TAUP Workshop Series, TAUP 2007, was organized by the Research Center for Neutrino Science, Tohoku University. In TAUP 2007 all the various aspects of Astroparticle Physics have been covered, from Cosmology and Dark Constituents, to Gravitational Waves, to Neutrino Physics and Astrophysics, to High Energy Astrophysics, to Cosmic Rays and Gamma-Rays Astronomy. New and important scientific results were presented and debated in the plenary review talks and in a very large number of contributions in topical parallel sessions. As editors of these proceedings, we hope that this volume, which contains most of the talks and contributions presented at TAUP 2007, will provide a detailed state-of-the-art account of the various facets of Astroparticle Physics. We thank all the invited speakers, conveners, and contributors who made this possible. Full coverage of the transparencies presented at the conference can be found on the website http://www.awa.tohoku.ac.jp/taup2007. The TAUP 2007 Organizing Committee thanks IUPAP/PaNAGIC, Sendai Tourism and Convention Bureau, COE program: Exploring New Science by Bridging Particle-Matter Hierarchy, SEIKO EG&G, and REPIC corporation for sponsoring the Conference, and Sendai Civic Auditorium, where the meeting was held, for their hospitality. We wish to thank Alessandro Bottino, Junpei Shirai, Fumihiko Suekane, David Sinclair, Takaaki Kajita, Takeo Moroi, Masaki Mori, Masahiro Kawasaki, Yoshihito Gando, Sei Yoshida, Kyoko Tamae, Sanshiro Enomoto, Alexandre Kozlov, Yasuhiro Kishimoto, Itaru Shimizu, Kengo Nakamura, Haruo Ikeda, and Kyo Nakajima for their invaluable contribution in the scientific shaping of the conference and in the preparation of the present volume. The Organizing Committee is grateful to the members of the International Advisory Committee and of the TAUP Steering Committee for assistance and advice on the scientific program. Very special thanks are due to Ms Rika Bizen, Mr Fujio Miura, Ms Akemi

  9. Non-Coop Station History

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Station history documentation for stations outside the US Cooperative Observer network. Primarily National Weather Service stations assigned WBAN station IDs. Other...

  10. Space station molecular sieve development

    Science.gov (United States)

    Chang, C.; Rousseau, J.

    1986-01-01

    An essential function of a space environmental control system is the removal of carbon dioxide (CO2) from the atmosphere to control the partial pressure of this gas at levels lower than 3 mm Hg. The use of regenerable solid adsorbents for this purpose was demonstrated effectively during the Skylab mission. Earlier sorbent systems used zeolite molecular sieves. The carbon molecular sieve is a hydrophobic adsorbent with excellent potential for space station application. Although carbon molecular sieves were synthesized and investigated, these sieves were designed to simulate the sieving properties of 5A zeolite and for O2/N2 separation. This program was designed to develop hydrophobic carbon molecular sieves for CO2 removal from a space station crew environment. It is a first phase effort involved in sorbent material development and in demonstrating the utility of such a material for CO2 removal on space stations. The sieve must incorporate the following requirements: it must be hydrophobic; it must have high dynamic capacity for carbon dioxide at the low partial pressure of the space station atmosphere; and it must be chemiclly stable and will not generate contaminants.

  11. "Life without nuclear power": A nuclear plant retirement formulation model and guide based on economics. San Onofre Nuclear Generating Station case: Economic impacts and reliability considerations leading to plant retirement

    Science.gov (United States)

    Wasko, Frank

    Traditionally, electric utilities have been slow to change and very bureaucratic in nature. This culture, in and of itself, has now contributed to a high percentage of United States electric utilities operating uneconomical nuclear plants (Crooks, 2014). The economic picture behind owning and operating United States nuclear plants is less than favorable for many reasons including rising fuel, capital and operating costs (EUCG, 2012). This doctoral dissertation is specifically focused on life without nuclear power. The purpose of this dissertation is to create a model and guide that will provide electric utilities who currently operate or will operate uneconomical nuclear plants the opportunity to economically assess whether or not their nuclear plant should be retired. This economic assessment and stakeholder analysis will provide local government, academia and communities the opportunity to understand how Southern California Edison (SCE) embraced system upgrade import and "voltage support" opportunities to replace "base load" generation from San Onofre Nuclear Generating Station (SONGS) versus building new replacement generation facilities. This model and guide will help eliminate the need to build large replacement generation units as demonstrated in the SONGS case analysis. The application of The Nuclear Power Retirement Model and Guide will provide electric utilities with economic assessment parameters and an evaluation assessment progression needed to better evaluate when an uneconomical nuclear plant should be retired. It will provide electric utilities the opportunity to utilize sound policy, planning and development skill sets when making this difficult decision. There are currently 62 nuclear power plants (with 100 nuclear reactors) operating in the United States (EIA, 2014). From this group, 38 are at risk of early retirement based on the work of Cooper (2013). As demonstrated in my model, 35 of the 38 nuclear power plants qualify to move to the economic

  12. Amtrak Rail Stations (National)

    Data.gov (United States)

    Department of Transportation — Updated database of the Federal Railroad Administration's (FRA) Amtrak Station database. This database is a geographic data set containing Amtrak intercity railroad...

  13. Cooperative Station History Forms

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Various forms, photographs and correspondence documenting the history of Cooperative station instrumentation, location changes, inspections, and...

  14. Optimization of station battery replacement

    International Nuclear Information System (INIS)

    Jancauskas, J.R.; Shook, D.A.

    1994-01-01

    During a loss of ac power at a nuclear generating station (including diesel generators), batteries provide the source of power which is required to operate safety-related components. Because traditional lead-acid batteries have a qualified life of 20 years, the batteries must be replaced a minimum of once during a station's lifetime, twice if license extension is pursued, and more often depending on actual in-service dates and the results of surveillance tests. Replacement of batteries often occurs prior to 20 years as a result of systems changes caused by factors such as Station Blackout Regulations, control system upgrades, incremental load growth, and changes in the operating times of existing equipment. Many of these replacement decisions are based on the predictive capabilities of manual design basis calculations. The inherent conservatism of manual calculations may result in battery replacements occurring before actually required. Computerized analysis of batteries can aid in optimizing the timing of replacements as well as in interpreting service test data. Computerized analysis also provides large benefits in maintaining the as-configured load profile and corresponding design margins, while also providing the capability of quickly analyze proposed modifications and response to internal and external audits

  15. Optimization of station battery replacement

    Science.gov (United States)

    Jancauskas, J. R.; Shook, D. A.

    1994-08-01

    During a loss of ac power at a nuclear generating station (including diesel generators), batteries provide the source of power which is required to operate safety-related components. Because traditional lead-acid batteries have a qualified life of 20 years, the batteries must be replaced a minimum of once during a station's lifetime, twice if license extension is pursued, and more often depending on actual in-service dates and the results of surveillance tests. Replacement of batteries often occurs prior to 20 years as a result of systems changes caused by factors such as Station Blackout Regulations, control system upgrades, incremental load growth, and changes in the operating times of existing equipment. Many of these replacement decisions are based on the predictive capabilities of manual design basis calculations. The inherent conservatism of manual calculations may result in battery replacements occurring before actually required. Computerized analysis of batteries can aid in optimizing the timing of replacements as well as in interpreting service test data. Computerized analysis also provides large benefits in maintaining the as-configured load profile and corresponding design margins, while also providing the capability to quickly analyze proposed modifications and respond to internal and external audits.

  16. Applying 3D Dynamic Visualisation to (Palaeo) Geomorphic Reconstruction: Modelling a Tenth Century Jökulhlaup at Sólheimajökull Glacier, South Iceland.

    Science.gov (United States)

    Booth, Laura; Isaacs, John

    2014-05-01

    Jökulhlaup (glacial outburst floods) are caused by subglacial geothermal activity melting overlying ice, or by draining of ice-dammed lakes. They pose a recurring hazard along Iceland's south coast where volcano-glacial interactions create often unpredictable, high-magnitude floods. Gathering information about past floods is crucial for projecting findings to present day scenarios and developing future predictions for contemporary flood routes. Understanding the physical setting or surrounding environment is essential in palaeo-flood reconstruction as drainage routes are ultimately defined by local topography and changing ice cover. At Sólheimajökull glacier, which drains the southern portion of Mýrdalsjökull ice cap, field evidence has been collected of a Tenth Century flood, recorded in the Icelander's Landnámabók (Book of Settlements). It was an exceptional event in terms of generation, magnitude and geomorphic impact. Although now fragmented and piecemeal, many of its direct (and indirect) geomorphological and sedimentary markers are still relatively well preserved and have been identified, mapped and dated to unravel the sequence of events played out during this significant episode in the glacial history and complex regional flood chronology. VolcVis, an innovative, bespoke visualisation platform, is developed and applied for the first time in visualising volcanic jökulhlaup. The platform is created using the Microsoft XNA game development framework, which facilitates rapid game engine production by providing a set of tools utilising a managed runtime environment. VolcVis can render large amounts of data efficiently and still provide an extremely high level of interaction with the data being presented, including full freedom of motion. This enables synthesis and presentation of field results from Sólheimajökull in a novel way, creating an interactive, multi-perspective, three-dimensional (3D) prototype model. The platform combines Digital Elevation

  17. Solidifying power station resins and sludges

    International Nuclear Information System (INIS)

    Willis, A.S.D.; Haigh, C.P.

    1984-01-01

    Radioactive ion exchange resins and sludges arise at nuclear power stations from various operations associated with effluent treatment and liquid waste management. As the result of an intensive development programme, the Central Electricity Generating Board (CEGB) has designed a process to convert power station resins and sludges into a shielded, packaged solid monolithic form suitable for final disposal. Research and development, the generic CEGB sludge/resin conditioning plant and the CEGB Active Waste Project are described. (U.K.)

  18. Radiation shielded movable work station apparatus

    International Nuclear Information System (INIS)

    Meuschke, R.E.; Andrews, H.N.; Massaro, A.A. Jr.

    1982-01-01

    A movable work station includes travelling hoist-supported tools and a radiation-shielded enclosure or gondola that may be moved vertically or rotated. The enclosure is divided and accommodates four upright workers in facing pairs at opposite sides of a clearanceway observable and accessible from the gondola interior via lead glass windows and hand holes. The work station is particularly suitable for personnel involved in tube bundle replacement tasks performed within the shell of a nuclear power plant steam generator

  19. MHD power station with coal gasification

    International Nuclear Information System (INIS)

    Brzozowski, W.S.; Dul, J.; Pudlik, W.

    1976-01-01

    A description is given of the proposed operating method of a MHD-power station including a complete coal gasification into lean gas with a simultaneous partial gas production for the use of outside consumers. A comparison with coal gasification methods actually being used and full capabilities of power stations heated with coal-derived gas shows distinct advantages resulting from applying the method of coal gasification with waste heat from MHD generators working within the boundaries of the thermal-electric power station. (author)

  20. Decommissioning of nuclear power stations

    International Nuclear Information System (INIS)

    Gregory, A.R.

    1988-01-01

    In the United Kingdom the Electricity Boards, the United Kingdom Atomic Energy Authority (UKAEA) and BNFL cooperate on all matters relating to the decommissioning of nuclear plant. The Central Electricity Generating Board's (CEGB) policy endorses the continuing need for nuclear power, the principle of reusing existing sites where possible and the building up of sufficient funds during the operating life of a nuclear power station to meet the cost of its complete clearance in the future. The safety of the plant is the responsibility of the licensee even in the decommissioning phase. The CEGB has carried out decommissioning studies on Magnox stations in general and Bradwell and Berkeley in particular. It has also been involved in the UKAEA Windscale AGR decommissioning programme. The options as to which stage to decommission to are considered. Methods, costs and waste management are also considered. (U.K.)

  1. Space Station tethered elevator system

    Science.gov (United States)

    Haddock, Michael H.; Anderson, Loren A.; Hosterman, K.; Decresie, E.; Miranda, P.; Hamilton, R.

    1989-01-01

    The optimized conceptual engineering design of a space station tethered elevator is presented. The tethered elevator is an unmanned, mobile structure which operates on a ten-kilometer tether spanning the distance between Space Station Freedom and a platform. Its capabilities include providing access to residual gravity levels, remote servicing, and transportation to any point along a tether. The report discusses the potential uses, parameters, and evolution of the spacecraft design. Emphasis is placed on the elevator's structural configuration and three major subsystem designs. First, the design of elevator robotics used to aid in elevator operations and tethered experimentation is presented. Second, the design of drive mechanisms used to propel the vehicle is discussed. Third, the design of an onboard self-sufficient power generation and transmission system is addressed.

  2. Nuclear power stations licensing

    International Nuclear Information System (INIS)

    Solito, J.

    1978-04-01

    The judicial aspects of nuclear stations licensing are presented. The licensing systems of the United States, Spain, France and Federal Republic of Germany are focused. The decree n 0 60.824 from July 7 sup(th), 1967 and the following legislation which define the systematic and area of competence in nuclear stations licensing are analysed [pt

  3. Ondergronds Station Blijdorp, Rotterdam

    NARCIS (Netherlands)

    Hijma, M.P.|info:eu-repo/dai/nl/266562426; Cohen, K.M.|info:eu-repo/dai/nl/185633374

    2014-01-01

    Het is in de herfst van 2005. Een lief meisje, Marieke, rijdt op haar vouwfiets door Rotterdam. Bij het Centraal Station is het al tijden een grote bouwplaats. Onder de nieuwe hal komt een veel groter metrostation en ook onder de Statenweg in Blijdorp is een grote bouwput voor een nieuw station.

  4. SPS rectifier stations

    CERN Multimedia

    CERN PhotoLab

    1974-01-01

    The first of the twelves SPS rectifier stations for the bending magnets arrived at CERN at the end of the year. The photograph shows a station with the rectifiers on the left and in the other three cubicles the chokes, capacitors and resistor of the passive filter.

  5. Meyrin Petrol Station

    CERN Multimedia

    2006-01-01

    Please note that the Meyrin petrol station will be closed for maintenance work on Tuesday 19 and Wednesday 20 December 2006. If you require petrol during this period we invite you to use the Prévessin petrol station, which will remain open. TS-IC-LO Section Tel.: 77039 - 73793

  6. The Roman stational liturgy

    Directory of Open Access Journals (Sweden)

    Janusz Mieczkowski

    2012-03-01

    Full Text Available The papal stational liturgy in Rome was a particular kind of worship service from the Christian Antiquity to the XIV century. Its essential elements are four. Its always took place under the leadership of the pope or his representative. This form of liturgy was mobile: it was celebrated in different basilicas or churches of Rome. Third, the choice of church depended on the feast, liturgical seasons or commemoration being celebrated. Fourth, the stational liturgy was the urban liturgical celebration of the day. The highpoint of this system was Lent. Throughout the entire system Church of Rome manifested its own unity. The station was usually the Pope’s solemn mass in the stational church for the whole city. But on certain days in the year the Pope went in another church (collecta, from which a solemn procession was made to the stational church.

  7. Faculty as Bridges to Co-Curricular Engagement and Community for First-Generation International Students

    Science.gov (United States)

    Glass, Chris R.; Gesing, Peggy; Hales, Angela; Cong, Cong

    2017-01-01

    The proportion of first-generation international students at US institutions ranges from one-tenth to one-half of the total international student body. First-generation status is an underexplored, and potentially significant, demographic factor in international students' adaptation to college. Researchers used structural equation modelling (SEM)…

  8. Strategies To Improve the Self-Esteem of Ninth and Tenth Grade Haitian Limited English Proficient Students through a Self-Concept Program.

    Science.gov (United States)

    Bien-Aime, Joseph C.

    In response to a situation in which limited-English-proficient Haitian students were found to have behavior problems, anxiety, depression, low motivation, low energy, and underachievement, attributed to low self-esteem, a project was undertaken to improve student self-concept and achievement. Ninth- and tenth-grade Haitian English-as-a-Second…

  9. Science and stewardship to protect and sustain wilderness values: Tenth World Wilderness Congress symposium; 2013, 4-10 October, Salamanca, Spain

    Science.gov (United States)

    Alan Watson; Stephen Carver; Zdenka Krenova; Brooke McBride

    2015-01-01

    The Tenth World Wilderness Congress (WILD10) met in Salamanca, Spain in 2013. The symposium on science and stewardship to protect and sustain wilderness values was the largest of multiple symposia held in conjunction with the Congress. This symposium was organized and sponsored by the Aldo Leopold Wilderness Research Institute, the Wildland Research Institute of the...

  10. The Igbo People of Nigeria as Seen Through "Things Fall Apart" by Chinua Achebe. An Instructional Unit for Tenth Grade English.

    Science.gov (United States)

    Talley, Odessa B.

    This teaching guide is intended to aid tenth grade English classroom teachers as they develop and implement educational programs on the Igbo-speaking people of Nigeria. The source material for this unit is "Things Fall Apart," by Chinua Achebe. The guide is a product of an interdisciplinary summer workshop for teachers on development of…

  11. Nova isolates noise to quieten stations

    International Nuclear Information System (INIS)

    Milner, G.J.; Frank, L.D.

    1993-01-01

    This paper reviews a technique developed by Nova Corp., to help isolate and measure the acoustic power of individual components in a pipeline compressor and pumping station. The procedure calculates the sound pressure levels of each piece of equipment independently. Based on these measurements, a prediction can be made of the effect of various types of noise treatment techniques on the overall sound levels currently generated or proposed in a future project. This paper describes the equipment to measure the sound levels, techniques for actually measuring the compressor station or equipment area, and techniques used to generate a remediation plan

  12. Space station operations management

    Science.gov (United States)

    Cannon, Kathleen V.

    1989-01-01

    Space Station Freedom operations management concepts must be responsive to the unique challenges presented by the permanently manned international laboratory. Space Station Freedom will be assembled over a three year period where the operational environment will change as significant capability plateaus are reached. First Element Launch, Man-Tended Capability, and Permanent Manned Capability, represent milestones in operational capability that is increasing toward mature operations capability. Operations management concepts are being developed to accomodate the varying operational capabilities during assembly, as well as the mature operational environment. This paper describes operations management concepts designed to accomodate the uniqueness of Space Station Freedoom, utilizing tools and processes that seek to control operations costs.

  13. Pumps for nuclear power stations

    International Nuclear Information System (INIS)

    Ogura, Shiro

    1979-01-01

    16 nuclear power plants are in commercial operation in Japan, and nuclear power generation holds the most important position among various substitute energies. Hereafter also, it is expected that the construction of nuclear power stations will continue because other advantageous energy sources are not found. In this paper, the outline of the pumps used for BWR plants is described. Nuclear power stations tend to be large scale to reduce the construction cost per unit power output, therefore the pumps used are those of large capacity. The conditions to be taken in consideration are high temperature, high pressure, radioactive fluids, high reliability, hydrodynamic performances, aseismatic design, relevant laws and regulations, and quality assurance. Pumps are used for reactor recirculation system, control rod driving hydraulic system, boric acid solution injecting system, reactor coolant purifying system, fuel pool cooling and purifying system, residual heat removing system, low pressure and high pressure core spraying systems, and reactor isolation cooling system, for condensate, feed water, drain and circulating water systems of turbines, for fresh water, sea water, make-up water and fire fighting services, and for radioactive waste treating system. The problems of the pumps used for nuclear power stations are described, for example, the requirement of high reliability, the measures to radioactivity and the aseismatic design. (Kako, I.)

  14. Availability of uranium present in the sludge generated at two stations of potable water treatment; Disponibilidad del uranio presente en el fango generado en dos estaciones de tratamiento de agua potable

    Energy Technology Data Exchange (ETDEWEB)

    Munoz-Serrano, A.; Baeza, A.; Salas, A.; Guillen, J.

    2013-07-01

    During the treatment is carried out in a Station Potable Water Treatment Plant sludge enriched are produced in components that have been removed from the water. The concentration and availability of radionuclides accumulated in a sludge during coagulation-flocculation will condition possible later use, so it is essential to carry out the characterization of sludge and its chemical speciation. (Author)

  15. Materials Test Station

    Data.gov (United States)

    Federal Laboratory Consortium — When completed, the Materials Test Station at the Los Alamos Neutron Science Center will meet mission need. MTS will provide the only fast-reactor-like irradiation...

  16. MCFRS Incidents by Station

    Data.gov (United States)

    Montgomery County of Maryland — This dataset contains the monthly summary data indicating incident occurred in each fire station response area. The summary data is the incident count broken down by...

  17. FEMA DFIRM Station Start

    Data.gov (United States)

    Minnesota Department of Natural Resources — This table contains information about station starting locations. These locations indicate the reference point that was used as the origin for distance measurements...

  18. "Central Station" Londonis

    Index Scriptorium Estoniae

    2000-01-01

    Londoni galeriis Milch seitsme läti, leedu ja eesti kunstniku projekt "Central Station". Kuraatorid Lisa Panting, Sally Tallant. Eestist osalevad Hanno Soans (Catarina Campinoga koostöös valminud video), Kiwa, Kai Kaljo

  19. Mukilteo Research Station

    Data.gov (United States)

    Federal Laboratory Consortium — Research at the Mukilteo Research Station focuses on understanding the life cycle of marine species and the impacts of ecosystem stressors on anadromous and marine...

  20. Routes and Stations

    Data.gov (United States)

    Department of Homeland Security — he Routes_Stations table is composed of fixed rail transit systems within the Continental United States, Alaska, Hawaii, the District of Columbia, and Puerto Rico....

  1. Public Transit Stations

    Data.gov (United States)

    Department of Homeland Security — fixed rail transit stations within the Continental United States, Alaska, Hawaii, the District of Columbia, and Puerto Rico. The modes of transit that are serviced...

  2. Electrostatic pickup station

    CERN Multimedia

    CERN PhotoLab

    1982-01-01

    Electrostatic pickup station, with 4 interleaved electrodes, to measure beam position in the horizontal and vertical plane. This type is used in the transfer lines leaving the PS (TT2, TT70, TTL2). See also 7904075.

  3. Capacity at Railway Stations

    DEFF Research Database (Denmark)

    Landex, Alex

    2011-01-01

    zone(s) the possible conflicts with other trains (also in the opposite direction) are taken into account leading to more trustworthy results. Although the UIC 406 methodology proposes that the railway network should be divided into line sections when trains turn around and when the train order...... is changed, this paper recommends that the railway lines are not always be divided. In case trains turn around on open (single track) line, the capacity consumption may be too low if a railway line is divided. The same can be the case if only few trains are overtaken at an overtaking station. For dead end......Stations do have other challenges regarding capacity than open lines as it is here the traffic is dispatched. The UIC 406 capacity method that can be used to analyse the capacity consumption can be exposed in different ways at stations which may lead to different results. Therefore, stations need...

  4. Master Station History Report

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Standard/Legacy MSHR, formally identified as the DSI-9767 dataset, is the legacy dataset/report sorted by NCDC Station ID and period of record. This...

  5. ASOS Station Photos

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The images contained in this library are of stations in the Automated Surface Observing System (ASOS) network. These images were taken between 1998-2001 for the ASOS...

  6. Natural Weathering Exposure Station

    Data.gov (United States)

    Federal Laboratory Consortium — The Corps of Engineers' Treat Island Natural Weathering Exposure Station is a long-term natural weathering facility used to study concrete durability. Located on the...

  7. Multiple Craft Stations.

    Science.gov (United States)

    Johns, Mary Sue

    1980-01-01

    Described are three craft stations (claywork, papermaking, and stamp designing) for intermediate grade students, to correlate with their classroom study which focused on Ohio: its history, geography, cities, industries, products and famous natives. (KC)

  8. Signal Station Inspection Reports

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Handwritten reports resulting from detailed inspections of US Army Signal Service Stations, 1871-1889. Features reported included instrument exposure and condition,...

  9. Maine Field Station

    Data.gov (United States)

    Federal Laboratory Consortium — In 2000 NOAA's National Marine Fisheries Service established the Maine Field Station in Orono, ME to have more direct involvement in the conservation of the living...

  10. Space Station galley design

    Science.gov (United States)

    Trabanino, Rudy; Murphy, George L.; Yakut, M. M.

    1986-01-01

    An Advanced Food Hardware System galley for the initial operating capability (IOC) Space Station is discussed. Space Station will employ food hardware items that have never been flown in space, such as a dishwasher, microwave oven, blender/mixer, bulk food and beverage dispensers, automated food inventory management, a trash compactor, and an advanced technology refrigerator/freezer. These new technologies and designs are described and the trades, design, development, and testing associated with each are summarized.

  11. National Seismic Station

    International Nuclear Information System (INIS)

    Stokes, P.A.

    1982-06-01

    The National Seismic Station was developed to meet the needs of regional or worldwide seismic monitoring of underground nuclear explosions to verify compliance with a nuclear test ban treaty. The Station acquires broadband seismic data and transmits it via satellite to a data center. It is capable of unattended operation for periods of at least a year, and will detect any tampering that could result in the transmission of unauthentic seismic data

  12. Gas Stations, US, 2010, NAVTEQ

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Gas_Stations dataset is derived from the Navteq 'AUTOSVC' SDC layer (FAC_TYPE=5540) and contains gas stations and petrol stations. This NAVTEQ dataset is...

  13. Enhanced Master Station History Report

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Enhanced Master Station History Report (EMSHR) is a compiled list of basic, historical information for every station in the station history database, beginning...

  14. Generation of sequences of daily radiation values using a library of Markov transition matrices. Application of weather station in tre University od Vigo; Generacion de secuencias de radiacion diaria utilizando librerias de matrices de Markov. Aplicacion a la estacion meteorologica de la Universidad de Vigo

    Energy Technology Data Exchange (ETDEWEB)

    Sieres, J. A.; Vazquez, M.; Fernandez-Seara, J.

    2004-07-01

    In this paper, the generation of sequences of daily radiation values using a library of Markov transition matrices is analysed. The paper describes the fundamentals of the method employed and how sequences of daily radiation can be generated using as input monthly averaged values of the clearness index. The method is applied to the location where the Solar Energy Lab Weather Station of the University of Vigo (longitude 8 degree 41' 18'' O, latitude 42 degree 10' 9'' N) is placed. Radiation sequences are generated for the years 2002 and 2003 and the results are compared with measured radiation values. Results of statistical tests show a bad performance of the generation method for the location studied. (Author)

  15. Tenth International RETRAN Conference Overview: RETRAN's Role in Supporting the Nuclear Industry's Vision

    International Nuclear Information System (INIS)

    Agee, Lance J.

    2003-01-01

    The nuclear industry's current 'vision' for 2020 is for growth in U.S. nuclear to a 23% share of generation in 2020. To support this vision, the Electric Power Research Institute's Nuclear Power Division has developed a strategic bridge plan. The major objectives of the plan are discussed. Of key importance is the U.S. Nuclear Regulatory Commission (NRC) staff's proposed framework for risk-informed regulations. RETRAN-3D will undoubtedly be used by the industry to support Risk-Informed Regulation, specifically option 3.The reason that RETRAN-3D is the most logical tool to support Risk-Informed Regulation is that in January 2001 the NRC issued a safety evaluation report (SER) on RETRAN-3D. The significance of the SER to the RETRAN community is described, and a list of the most important SER conditions provided.Next, the new and unique applications of RETRAN-3D are referenced. Finally, discussion of the future direction of safety software indicates what the author feels is needed to adequately support both existing plant upgrades and future plant designs

  16. Tenth-Order Lepton Anomalous Magnetic Moment--Sixth-Order Vertices Containing Vacuum-Polarization Subdiagrams

    International Nuclear Information System (INIS)

    Aoyama, Tatsumi; Hayakawa, Masashi; Kinoshita, Toichiro; Nio, Makiko

    2011-01-01

    This paper reports the values of contributions to the electron g-2 from 300 Feynman diagrams of the gauge-invariant Set III(a) and 450 Feynman diagrams of the gauge-invariant Set III(b). The evaluation is carried out in two versions. Version A is to start from the sixth-order magnetic anomaly M 6 obtained in the previous work. The mass-independent contributions of Set III(a) and Set III(b) are 2.1275(2) and 3.3271(6) in units of (α/π) 5 , respectively. Version B is based on the recently developed automatic code generation scheme. This method yields 2.1271(3) and 3.3271(8) in units of (α/π) 5 , respectively. They are in excellent agreement with the results of the first method within the uncertainties of numerical integration. Combining these results as statistically independent we obtain the best values, 2.1273(2), and 3.3271(5) times (α/π) 5 , for the mass-independent contributions of the Set III(a) and Set III(b), respectively. We have also evaluated mass-dependent contributions of diagrams containing muon and/or tau-particle loop. Including them the total contribution of Set III(a) is 2.1349(2) and that of Set III(b) is 3.3299(5) in units of (α/π) 5 . The total contributions to the muon g-2 of various leptonic vacuum-polarization loops of Set III(a) and Set III(b) are 112.418(32) and 15.407(5) in units of (α/π) 5 , respectively.

  17. Generation of electrical power

    International Nuclear Information System (INIS)

    Hursen, T.F.; Kolenik, S.A.; Purdy, D.L.

    1976-01-01

    A heat-to-electricity converter is disclosed which includes a radioactive heat source and a thermoelectric element of relatively short overall length capable of delivering a low voltage of the order of a few tenths of a volt. Such a thermoelectric element operates at a higher efficiency than longer higher-voltage elements; for example, elements producing 6 volts. In the generation of required power, the thermoelectric element drives a solid-state converter which is controlled by input current rather than input voltage and operates efficiently for a high signal-plus-noise to signal ratio of current. The solid-state converter has the voltage gain necessary to deliver the required voltage at the low input of the thermoelectric element

  18. Generation of electrical power

    Science.gov (United States)

    Hursen, Thomas F.; Kolenik, Steven A.; Purdy, David L.

    1976-01-01

    A heat-to-electricity converter is disclosed which includes a radioactive heat source and a thermoelectric element of relatively short overall length capable of delivering a low voltage of the order of a few tenths of a volt. Such a thermoelectric element operates at a higher efficiency than longer higher-voltage elements; for example, elements producing 6 volts. In the generation of required power, thermoelectric element drives a solid-state converter which is controlled by input current rather than input voltage and operates efficiently for a high signal-plus-noise to signal ratio of current. The solid-state converter has the voltage gain necessary to deliver the required voltage at the low input of the thermoelectric element.

  19. ‘Benefactoria’ and the formation of feudal networks in tenth- to twelfth-century Leon and Castile

    Directory of Open Access Journals (Sweden)

    Luis Martínez García

    2010-08-01

    Full Text Available This paper examines and evaluates the social networks that typified the feudal system. Using tenth- to twelfth-century documents, it explores the institution of benefactoria and the associated concepts of beneficium, servitium, prestimonium, and feudum in order to approach the subject of lordship: personal lordship at its most elementary, distinguished from other forms of power such as public jurisdiction or private property. Benefactoria and its associated concepts played a key role not only during the formative period of Leonese and Castilian lordship, but also in its subsequent development as a territorial institution. This paper argues that lordship, the definitive power-structure of the feudal system, was established and widely disseminated through the agreement of benefactoria pacts. These pacts, which enshrined the exchange of services for ‘protection’, were established between individuals and institutions that were socially unequal, and extended throughout free society, from the level of the king to that of the humblest peasants. In this sense, all free men were homines de benefactoria, linked together through private relationships of domination and submission, lordship and servitude: the inhabitants of properties that were specifically designated as behetrías simply represented a more partial and restrictive expression of the original concept of benefactoria. The pace and intensity of the processes that determined the formation and development of feudalism in León and Castile were marked by the spread of this type of social relationship, which was therefore both a defining factor and a catalyst within that system.

  20. An Unpublished Byzantine Medical Fragment (Parisinus Suppl. gr. 607: Pharmaceutical Knowledge and Practice in Tenth-Century Constantinople

    Directory of Open Access Journals (Sweden)

    Philip Rance

    2017-08-01

    Full Text Available The purpose of this paper is to introduce, edit and translate an unpublished fragment of Byzantine medical writing. Parisinus suppl. gr. 607 preserves a short and seemingly acephalous anthology of pharmaceutical remedies.  A consideration of recipe collections as a distinctive but hard-to-define species of Byzantine Fachliteratur seeks to integrate this text into recent scholarship concerning a broad category of informal therapeutic writings, which testify to Byzantine drug lore, clinical practice and medicinal book culture. Investigation of the codicological structure clarifies that a secondary hand copied the fragment onto a blank folio in the mid-tenth century, contemporary with the compilation this manuscript in a high socio-cultural and intellectual milieu in Constantinople. Examination of compositional contexts, embracing philological, textual, literary-historical and medical dimensions, suggests a ‘private’ remedy collection indicative of the use of texts in ‘household medicine’. This fragment draws particular attention as one of the earliest surviving specimens, while the codex has escaped the notice of previous inventories of Greek manuscripts with medical content.

  1. Assessment of groundwater pollution from the oxidation ponds in tenth of Ramadan city, using isotopic techniques and hydrogeological modelling

    International Nuclear Information System (INIS)

    Abd El-Samie, S.G.; Sadek, M.A.; Mahmoud, N.S.

    2002-01-01

    The tenth of ramadan city is an intensive industrial settement on the peripheries of cairo. All types of wastewater from industrial and domestic practices are discharged into three unlined oxidation ponds to eliminate pollutants. The present srudy has been conduted to assess the extent of seepage to groundwater from the ponds and how efficient they are for pollution reduction. The chemical composition is more developed in the groundwater of the miocene aquifer due to the less active recharge and the dominance of readily dissolved salts that interact with the inflow. The seepage from ismailia canal and the excess irrigation from agricultural lands and the infiltration from the oxidation ponds as well as the upleaked water represent the main sources of recharge in the quaternary aquifer. The chemical and isotopic composition of the water in the oxidation ponds is controlled by the nature of the drained water and the geochemical processes affecting the solute content. The isotopic enrichment differs for the three ponds being related to the evaporation intensity in each

  2. Nganyi Community Resource Centre: Community radio station ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    2016-05-04

    Nganyi Community Resource Centre: Community radio station broadcasts weather forecasts, climate change news to farmers in Kenya. May 04, 2016. Image ... To boost access, KMS distributed radio handsets to communities with a built-in solar power generator and wind-up system. KMS senior assistant director Samuel ...

  3. Distributed operating system for NASA ground stations

    Science.gov (United States)

    Doyle, John F.

    1987-01-01

    NASA ground stations are characterized by ever changing support requirements, so application software is developed and modified on a continuing basis. A distributed operating system was designed to optimize the generation and maintenance of those applications. Unusual features include automatic program generation from detailed design graphs, on-line software modification in the testing phase, and the incorporation of a relational database within a real-time, distributed system.

  4. Telephony Earth Station

    Science.gov (United States)

    Morris, Adrian J.; Kay, Stan

    The Telephony Earth Station (TES), a digital full-mesh SCPC (single channel per carrier) system designed for satellite voice and data transmission is described. As compared to companded FM, the advanced speech compression and forward error correction techniques used by TES better achieve the quality, power, and bandwidth ideal for each application. In addition, the TES offers a fully demand-assigned voice call setup, handles point-to-point data channels, supports a variety of signaling schemes, and does not require any separate pilot receivers at the station, while keeping costs low through innovative technology and packaging. The TES can be used for both C-band and Ku-band (domestic or international) applications, and is configurable either as an VSAT (very small aperture terminal) using an SSPA, or as a larger station depending on the capacity requirements. A centralized DAMA processor and network manager is implemented using a workstation.

  5. Waste Transfer Stations

    DEFF Research Database (Denmark)

    Christensen, Thomas Højlund

    2011-01-01

    tion and transport is usually the most costly part of any waste management system; and when waste is transported over a considerable distance or for a long time, transferring the waste from the collection vehicles to more efficient transportation may be economically beneficial. This involves...... a transfer station where the transfer takes place. These stations may also be accessible by private people, offering flexibility to the waste system, including facilities for bulky waste, household hazardous waste and recyclables. Waste transfer may also take place on the collection route from small...... satellite collection vehicles to large compacting vehicles that cannot effectively travel small streets and alleys within the inner city or in residential communities with narrow roads. However, mobile transfer is not dealt with in this chapter, which focuses on stationary transfer stations. This chapter...

  6. Extension of life of nuclear power stations

    International Nuclear Information System (INIS)

    Takahashi, Hideaki

    1991-01-01

    At the time of designing nuclear power stations, as their service life, generally 40 years are taken, and the basic design specifications of machinery and equipment are determined. In USA where atomic energy has been developed, the new construction of nuclear power stations is cased for a while, however, if this situation continues as it is, since old power stations reach the service life of 40 years and are retired in near future, it is feared that the circumstance of the total amount of power generation becoming short will occur. As one of the countermeasures to this, the research on the extension of life of nuclear power stations has been carried out in many fields in USA, and it is expected that the application for extending the life for the power stations constructed in the initial period of development is submitted in 1991. The researches that have been carried out for solving the technical problems in this extension of life and the situation in Japan are reported. The NEC of USA decided that the operation period of nuclear power stations in USA, which is considered to be 40 years so far, can be extended up to the limit of 20 years. The background and circumstances of this problem in USA, Nuclear Plant Aging Research Program, Plant Life Extension Program and so on are reported. (K.I.)

  7. Hydrogen vehicle fueling station

    Energy Technology Data Exchange (ETDEWEB)

    Daney, D.E.; Edeskuty, F.J.; Daugherty, M.A. [Los Alamos National Lab., NM (United States)] [and others

    1995-09-01

    Hydrogen fueling stations are an essential element in the practical application of hydrogen as a vehicle fuel, and a number of issues such as safety, efficiency, design, and operating procedures can only be accurately addressed by a practical demonstration. Regardless of whether the vehicle is powered by an internal combustion engine or fuel cell, or whether the vehicle has a liquid or gaseous fuel tank, the fueling station is a critical technology which is the link between the local storage facility and the vehicle. Because most merchant hydrogen delivered in the US today (and in the near future) is in liquid form due to the overall economics of production and delivery, we believe a practical refueling station should be designed to receive liquid. Systems studies confirm this assumption for stations fueling up to about 300 vehicles. Our fueling station, aimed at refueling fleet vehicles, will receive hydrogen as a liquid and dispense it as either liquid, high pressure gas, or low pressure gas. Thus, it can refuel any of the three types of tanks proposed for hydrogen-powered vehicles -- liquid, gaseous, or hydride. The paper discusses the fueling station design. Results of a numerical model of liquid hydrogen vehicle tank filling, with emphasis on no vent filling, are presented to illustrate the usefulness of the model as a design tool. Results of our vehicle performance model illustrate our thesis that it is too early to judge what the preferred method of on-board vehicle fuel storage will be in practice -- thus our decision to accommodate all three methods.

  8. Space Station cupola definition

    Science.gov (United States)

    Weaver, Laurie A.

    1988-01-01

    The concept of a Space Station cupola has evolved from a small bubble-type viewport into the primary location for proximity operations requiring direct unobstructed viewing. Derived from a viewing analysis conducted by the Man-Systems Division at the Johnson Space Center, the cupola represents a solution for out-of-plane viewing which cannot be provided by windows placed in the shell of the habitation and/or laboratory modules. An extended Man-Systems design study resulted in several cupola configurations, each illustrating an alternate solution to the required balance between viewing, projected Space Station operations, and human/machine interface issues.

  9. Resolution 443/012. It authorize to POLESINE S.A to generate wind power generation as aeolian source thought a generating station located in the first and fifth cad astral sections in Florida province, as well as its connection to National Interconnected System

    International Nuclear Information System (INIS)

    2012-01-01

    This decree authorizes the generation of electricity using aeolian energy as the primary electricity source. This project was presented by the POLESINE S.A company according to the requirements from the National Energy Regulatory Unit and the Energy and Water Services Organization.

  10. WGS 84 Coordinate Validation and Improvement for the NIMA and Air Force GPS Tracking Stations

    National Research Council Canada - National Science Library

    Cunningham, James

    1996-01-01

    Using 10 days of Global Positioning System (GPS) pseudorange and carrier phase data collected in 1995 from 31 stations and 24 Block II/IIA satellites, estimates of GPS clocks, orbits, and tracking station coordinates were generated...

  11. 2008 Science Accomplishments Report of the Pacific Northwest Research Station

    Science.gov (United States)

    Rhonda Mazza

    2009-01-01

    This report highlights significant research findings and accomplishments by scientists at the Pacific Northwest (PNW) Research Station during fiscal year 2008. The mission of the PNW Research Station is to generate and communicate scientific knowledge that helps people understand and make informed choices about people, natural resources, and the environment. The work...

  12. 2013 Science Accomplishments Report of the Pacific Northwest Research Station

    Science.gov (United States)

    Rhonda Mazza

    2014-01-01

    Communicating the scientific knowledge generated by the Pacific Northwest Research Station is integral to our mission. The 2013 Science Accomplishments reports highlights the breadth of the station’s research, the relevance of our science findings, and the application of these findings. The photographs throughout the report showcase the region where we work and how...

  13. 2014 Science Accomplishments Report of the Pacific Northwest Research Station

    Science.gov (United States)

    Rhonda Mazza

    2015-01-01

    Communicating the scientific knowledge generated by the Pacific Northwest Research Station is integral to our mission. The 2014 Science Accomplishments reports highlights the breadth of the station’s research, the relevance of our science findings, and the application of these findings. The photographs throughout the report showcase the region where we work and how...

  14. Shippingport Station Decommissioning Project

    International Nuclear Information System (INIS)

    1989-01-01

    This Topical Report is a synopsis of the decontamination of plant components and structures at the Shippingport Station Decommissioning Project (SSDP). The information is provided as a part of the Technology Transfer Program to document the preparation activities in support of the shipment of radioactive wastes and the unconditional release of the site and structural materials. 1 ref., 16 figs., 4 tabs

  15. Designing a Weather Station

    Science.gov (United States)

    Roman, Harry T.

    2012-01-01

    The collection and analysis of weather data is crucial to the location of alternate energy systems like solar and wind. This article presents a design challenge that gives students a chance to design a weather station to collect data in advance of a large wind turbine installation. Data analysis is a crucial part of any science or engineering…

  16. Hydrogen Fuelling Stations

    DEFF Research Database (Denmark)

    Rothuizen, Erasmus Damgaard

    station has been developed in Dymola. The models include the fuelling protocol (J2601) for hydrogen vehicles made by Society of Automotive Engineers (SAE) and the thermodynamic property library CoolProp is used for retrieving state point. The components in the hydrogen fuelling library are building up...

  17. Avoiding Service Station Fraud.

    Science.gov (United States)

    Burton, Grace M.; Burton, John R.

    1982-01-01

    High school students are warned against service station fraud. A problem-solving section is designed to help students calculate consumer costs for various fraudulent transactions. Several ways of reducing fraud or of lessening the chances of problems are noted. (MP)

  18. The Service Station.

    Science.gov (United States)

    Ohio State Univ., Columbus. Center for Vocational and Technical Education.

    The purpose of the teacher's guide is to encourage the primary student to expand his or her awareness of jobs within the community. The role of the service station worker is examined, with emphasis on the goods and services provided. Subject areas for which the materials in this guide have potential are social studies, art, and language. Each set…

  19. Electrostatic pickup station

    CERN Multimedia

    CERN PhotoLab

    1979-01-01

    Electrostatic pickup station, with 4 electrodes, to measure beam position in the horizontal and vertical plane. This type is used in the transfer lines leaving the PS (TT2, TTL2, TT70). See also 8206063, where the electrode shapes are clearly visible.

  20. Space Station Water Quality

    Science.gov (United States)

    Willis, Charles E. (Editor)

    1987-01-01

    The manned Space Station will exist as an isolated system for periods of up to 90 days. During this period, safe drinking water and breathable air must be provided for an eight member crew. Because of the large mass involved, it is not practical to consider supplying the Space Station with water from Earth. Therefore, it is necessary to depend upon recycled water to meet both the human and nonhuman water needs on the station. Sources of water that will be recycled include hygiene water, urine, and cabin humidity condensate. A certain amount of fresh water can be produced by CO2 reduction process. Additional fresh water will be introduced into the total pool by way of food, because of the free water contained in food and the water liberated by metabolic oxidation of the food. A panel of scientists and engineers with extensive experience in the various aspects of wastewater reuse was assembled for a 2 day workshop at NASA-Johnson. The panel included individuals with expertise in toxicology, chemistry, microbiology, and sanitary engineering. A review of Space Station water reclamation systems was provided.

  1. International Space Station Assembly

    Science.gov (United States)

    1999-01-01

    The International Space Station (ISS) is an unparalleled international scientific and technological cooperative venture that will usher in a new era of human space exploration and research and provide benefits to people on Earth. On-Orbit assembly began on November 20, 1998, with the launch of the first ISS component, Zarya, on a Russian Proton rocket. The Space Shuttle followed on December 4, 1998, carrying the U.S.-built Unity cornecting Module. Sixteen nations are participating in the ISS program: the United States, Canada, Japan, Russia, Brazil, Belgium, Denmark, France, Germany, Italy, the Netherlands, Norway, Spain, Sweden, Switzerland, and the United Kingdom. The ISS will include six laboratories and be four times larger and more capable than any previous space station. The United States provides two laboratories (United States Laboratory and Centrifuge Accommodation Module) and a habitation module. There will be two Russian research modules, one Japanese laboratory, referred to as the Japanese Experiment Module (JEM), and one European Space Agency (ESA) laboratory called the Columbus Orbital Facility (COF). The station's internal volume will be roughly equivalent to the passenger cabin volume of two 747 jets. Over five years, a total of more than 40 space flights by at least three different vehicles - the Space Shuttle, the Russian Proton Rocket, and the Russian Soyuz rocket - will bring together more than 100 different station components and the ISS crew. Astronauts will perform many spacewalks and use new robotics and other technologies to assemble ISS components in space.

  2. Space Station Energy Sizing

    Science.gov (United States)

    Rice, R. R.

    1983-01-01

    A general schematic for a space station power system is described. The major items of interest in the power system are the solar array, transfer devices, energy storage, and conversion equipment. Each item will have losses associated with it and must be utilized in any sizing study, and can be used as a checklist for itemizing the various system components.

  3. Gravitational biology on the space station

    Science.gov (United States)

    Keefe, J. R.; Krikorian, A. D.

    1983-01-01

    The current status of gravitational biology is summarized, future areas of required basic research in earth-based and spaceflight projects are presented, and potential applications of gravitational biology on a space station are demonstrated. Topics covered include vertebrate reproduction, prenatal/postnatal development, a review of plant space experiments, the facilities needed for growing plants, gravimorphogenesis, thigmomorphogenesis, centrifuges, maintaining a vivarium, tissue culture, and artificial human organ generation. It is proposed that space stations carrying out these types of long-term research be called the National Space Research Facility.

  4. Small hydroelectric power stations and their reality

    International Nuclear Information System (INIS)

    Kamenski, Miroslav

    1999-01-01

    Construction of a small hydroelectric power station provides additional amounts of electric energy, engages a private capital, revives investment activities and promotes the use of renewable energy sources. Transmission losses are reduced, a voltage of higher quality is achieved and idle power is compensated by the generation of electricity in the small hydroelectric power stations and at the place of consumption. Legislation and technical regulations, however, require a multidisciplinary approach, defining of complex spaces and environmental protection. Unfortunately, complete documents should be prepared for small,hydroelectric plants just as for big ones what is a long procedure and many of those papers are unnecessary or even superfluous. (Author)

  5. Improvements in steam cycle thermal power stations

    International Nuclear Information System (INIS)

    1973-01-01

    The invention relates to improvements in steam-cycle thermal power stations. In a heat storage and recovery installation, two exchangers provide a heat transfert between the working fluid and a thermofluid, in a direction or the other according as heat must be stored or recovered. In the case of heat storage, the exchanger makes use of live steam as heating fluid. In the case of heat recovery, the steam generator feed-water is heated in the exchangers at the expanse of the thermo-fluid, then in a water reheater using live steam as heating fluid. This can be applied to power stations feeding variable consumption networks [fr

  6. The Impact of Congruency Between Preferred and Actual Learning Environments on Tenth Graders' Science Literacy in Taiwan

    Science.gov (United States)

    Chang, Chun-Yen; Yeh, Ting-Kuang; Lin, Chun-Yen; Chang, Yueh-Hsia; Chen, Chia-Li D.

    2010-08-01

    This study explored the effects of congruency between preferred and actual learning environment (PLE & ALE) perceptions on students' science literacy in terms of science concepts, attitudes toward science, and the understanding of the nature of science in an innovative curriculum of High Scope Project, namely Sci-Tech Mind and Humane Heart (STMHH). A pre-/post-treatment experiment was conducted with 34 Taiwanese tenth graders involved in this study. Participating students' preferred learning environment perception and pre-instruction scientific literacy were evaluated before the STMHH curriculum. Their perceptions toward the actual STMHH learning environment and post-instruction scientific literacy were also examined after the STMHH. Students were categorized into two groups; "preferred alignment with actual learning environment" (PAA) and "preferred discordant with actual learning environment" (PDA), according to their PLEI and ALEI scores. The results of this study revealed that most of the students in this study preferred learning in a classroom environment where student-centered and teacher-centered learning environments coexisted. Furthermore, the ANCOVA analysis showed marginally statistically significant difference between groups in terms of students' post-test scores on scientific literacy with the students' pre-test scores as the covariate. As a pilot study with a small sample size aiming to probe the research direction of this problem, the result of marginally statistically significant and approaching large sized effect magnitude is likely to implicate that the congruency between preferred and actual learning environments on students' scientific literacy is noteworthy. Future study of this nature appears to merit further replications and investigations.

  7. Tenth NASTRAN User's Colloquium

    Science.gov (United States)

    1982-01-01

    The development of the NASTRAN computer program, a general purpose finite element computer code for structural analysis, was discussed. The application and development of NASTRAN is presented in the following topics: improvements and enhancements; developments of pre and postprocessors; interactive review system; the use of harmonic expansions in magnetic field problems; improving a dynamic model with test data using Linwood; solution of axisymmetric fluid structure interaction problems; large displacements and stability analysis of nonlinear propeller structures; prediction of bead area contact load at the tire wheel interface; elastic plastic analysis of an overloaded breech ring; finite element solution of torsion and other 2-D Poisson equations; new capability for elastic aircraft airloads; usage of substructuring analysis in the get away special program; solving symmetric structures with nonsymmetric loads; evaluation and reduction of errors induced by Guyan transformation.

  8. Tenth EUROGEN 2013

    CERN Document Server

    Galván, Blas; Périaux, Jacques; Gauger, Nicolas; Giannakoglou, Kyriakos; Winter, Gabriel; Advances in Evolutionary and Deterministic Methods for Design, Optimization and Control in Engineering and Sciences

    2015-01-01

    This book contains state-of-the-art contributions in the field of evolutionary and deterministic methods for design, optimization and control in engineering and sciences. Specialists have written each of the 34 chapters as extended versions of selected papers presented at the International Conference on Evolutionary and Deterministic Methods for Design, Optimization and Control with Applications to Industrial and Societal Problems (EUROGEN 2013). The conference was one of the Thematic Conferences of the European Community on Computational Methods in Applied Sciences (ECCOMAS). Topics treated in the various chapters are classified in the following sections: theoretical and numerical methods and tools for optimization (theoretical methods and tools; numerical methods and tools) and engineering design and societal applications (turbo machinery; structures, materials and civil engineering; aeronautics and astronautics; societal applications; electrical and electronics applications), focused particularly on intell...

  9. Technological upgrade of static system excitation of a hydraulic generator of 700 Mwats of the Hydroelectric Power Station Guri; Actualizacion tecnologica del sistema de excitacion estatico de un generador hidraulico de 700 MVA de la Central Hidroelectrica de Guri

    Energy Technology Data Exchange (ETDEWEB)

    Contreras, Romy; Guevara, Olivia [C.V.G. Electrificacion del Caroni, C.A. (EDELCA) (Venezuela)

    2004-07-01

    The Generating Units of 700 Mwatts of the Guri Plant from EDELCA are equipped with static excitation systems of analogue technology that using the closure and field's opening switch as a mechanism for the respective processes of excitation and generator dropout. This operational pattern, although functional, has been discontinuing by existing producers because of the inconvenience involved in the management of energy stored in field generator during the dropout. Alternatively, the manufacturers employ a technique of dropout without opening the switch field, based on return to the excitation transformer the energy contained in the field generator. This paper summarizes the EDELCA initiative to upgrade technologically their Generating Units, converting the excitement and dropout switch without opening the field. The project started with a phase of preliminary tests that showed the feasibility of the change and ended with the final implementation of the new scheme in a first unit (Generator n. 15). The results were successful, covering the expectations of the company, so it was decided to continue the project, extending it to the rest of the Generating Units. (author)

  10. Hydrogen Filling Station

    Energy Technology Data Exchange (ETDEWEB)

    Boehm, Robert F; Sabacky, Bruce; Anderson II, Everett B; Haberman, David; Al-Hassin, Mowafak; He, Xiaoming; Morriseau, Brian

    2010-02-24

    Hydrogen is an environmentally attractive transportation fuel that has the potential to displace fossil fuels. The Freedom CAR and Freedom FUEL initiatives emphasize the importance of hydrogen as a future transportation fuel. Presently, Las Vegas has one hydrogen fueling station powered by natural gas. However, the use of traditional sources of energy to produce hydrogen does not maximize the benefit. The hydrogen fueling station developed under this grant used electrolysis units and solar energy to produce hydrogen fuel. Water and electricity are furnished to the unit and the output is hydrogen and oxygen. Three vehicles were converted to utilize the hydrogen produced at the station. The vehicles were all equipped with different types of technologies. The vehicles were used in the day-to-day operation of the Las Vegas Valley Water District and monitoring was performed on efficiency, reliability and maintenance requirements. The research and demonstration utilized for the reconfiguration of these vehicles could lead to new technologies in vehicle development that could make hydrogen-fueled vehicles more cost effective, economical, efficient and more widely used. In order to advance the development of a hydrogen future in Southern Nevada, project partners recognized a need to bring various entities involved in hydrogen development and deployment together as a means of sharing knowledge and eliminating duplication of efforts. A road-mapping session was held in Las Vegas in June 2006. The Nevada State Energy Office, representatives from DOE, DOE contractors and LANL, NETL, NREL were present. Leadership from the National hydrogen Association Board of Directors also attended. As a result of this session, a roadmap for hydrogen development was created. This roadmap has the ability to become a tool for use by other road-mapping efforts in the hydrogen community. It could also become a standard template for other states or even countries to approach planning for a hydrogen

  11. Installation of Ohio's First Electrolysis-Based Hydrogen Fueling Station

    Science.gov (United States)

    Scheidegger, Brianne T.; Lively, Michael L.

    2012-01-01

    This paper describes progress made towards the installation of a hydrogen fueling station in Northeast Ohio. In collaboration with several entities in the Northeast Ohio area, the NASA Glenn Research Center is installing a hydrogen fueling station that uses electrolysis to generate hydrogen on-site. The installation of this station is scheduled for the spring of 2012 at the Greater Cleveland Regional Transit Authority s Hayden bus garage in East Cleveland. This will be the first electrolysis-based hydrogen fueling station in Ohio.

  12. Communication Base Station Log Analysis Based on Hierarchical Clustering

    Directory of Open Access Journals (Sweden)

    Zhang Shao-Hua

    2017-01-01

    Full Text Available Communication base stations generate massive data every day, these base station logs play an important value in mining of the business circles. This paper use data mining technology and hierarchical clustering algorithm to group the scope of business circle for the base station by recording the data of these base stations.Through analyzing the data of different business circle based on feature extraction and comparing different business circle category characteristics, which can choose a suitable area for operators of commercial marketing.

  13. 75 FR 33238 - Basin Electric Power Cooperative: Deer Creek Station

    Science.gov (United States)

    2010-06-11

    ... Station Energy Facility, a 300 MW combined-cycle natural gas generation facility, water pipeline... Conversion Facility Permit and a Route Permit to the SDPUC. The SDPUC permits would authorize Basin Electric...

  14. THE EFFECTIVENESS OF USING SCRABBLE AND BINGO GAME TECHNIQUE TOWARD STUDENTS’ VOCABULARY MASTERY AT THE TENTH GRADE OF SMA N 2 METRO ACADEMIC YEAR 2013/2014

    Directory of Open Access Journals (Sweden)

    Ahmad Rosidi -

    2017-02-01

    Full Text Available Abstract: Vocabulary mastery is the activity to enrich the vocabulary, they master the vocabulary in order to be able to master four language skills. The problem formulation of this research are; (1  Is there any difference influence of using Scrabble and Bingo Game Technique toward Students’ Vocabulary Mastery at The Tenth Grade of SMA N 2 Metro Academic Year 2013/3014? (2 Which one is more effective between Scrabble and Bingo Game Technique toward Students’ Vocabulary Mastery at The Tenth Grade of SMA N 2 Metro Academic Year 2013/3014 ?, The object of this research are; (1 To know whether there is any difference Influence of using Scrabble and Bingo Game Technique toward Students’ Vocabulary Mastery at The Tenth Grade of SMA N 2 Metro Academic Year 2013/3014, (2 To know which one is more effective between Scrabble and Bingo Game Technique toward Students’ Vocabulary Mastery at The Tenth Grade of SMA N 2 Metro Academic Year 2013/3014. This research is Quantitative research. Research design that will be used in this research is true experimental design (pretest posttest control group design.. The population of this research is the students’ of SMA N 2 Metro Academic Year 2013/2014 that consist of 660 students. The sample is 60 students. As the sample, 30 as experimental class and 30 as  control class. In taking sample, the researcher used the cluster stratified random sampling. The data collecting tehniques the researcher used try-out, pre-test, treatment and post-test. The data analyzing tehniques, the researcher used normality test, homogenity test and hypothesis test. The differences of both the tehnique are Scrabble Game can make the students feel enjoy, creative and have a challenge and Bingo Game gives the students opportunity to identify the word interestingly. Based on the data analysis, the researcher uses t-test formula. The researcher got the result of tobserved = 3,69 and ttable is 2.00. it means that tobserved > ttable

  15. Small power stations in the limelight

    International Nuclear Information System (INIS)

    Stricker, C.

    2001-01-01

    This short article discusses what the author describes as the small, 'decentrally situated' power stations of the future. The situation, where important players in the energy market are turning away from large-scale technology and propagating the use of small-scale decentralised power generation, is discussed. Technologies examined include micro-turbines, fuel cells, wind power, small combined heat and power units, Stirling-motor powered co-generation units and solar electricity generation. Also, the developments in the increasingly liberalised electricity market, in which electricity is already becoming a set of products from which the customer can freely choose, is discussed

  16. Mobile environmental radiation monitoring station

    International Nuclear Information System (INIS)

    Assido, H.; Shemesh, Y.; Mazor, T.; Tal, N.; Barak, D.

    1997-01-01

    A mobile environmental radiation monitoring station has been developed and established for the Israeli Ministry of Environment. The radiation monitoring station is ready for immediate placing in any required location, or can be operated from a vehicle. The station collects data Tom the detector and transfers it via cellular communication network to a Computerized Control Center for data storage, processing, and display . The mobile station is fully controlled from the. Routinely, the mobile station responses to the data request accumulated since the last communication session. In case of fault or alarm condition in the mobile station, a local claim is activated and immediately initiates communication with the via cellular communication network. (authors)

  17. Shippingport station communications program

    International Nuclear Information System (INIS)

    Stote, J.J.

    1988-01-01

    The author discusses how the communications program for the Shippingport Atomic Power Station has a long history. It can be traced as far back as 1953, when the U.S. Atomic Energy Commission (AEC) awarded a contract to Westinghouse Electric to design the nuclear portion of a power plant for electric utility use. During May of the next year, President Eisenhower initiated groundbreaking ceremonies for the construction of the commercial atomic power plant at Shippingport, Pennsylvania

  18. The nuclear power station

    International Nuclear Information System (INIS)

    Plettner, B.

    1987-04-01

    The processes taking place in a nuclear power plant and the dangers arising from a nuclear power station are described. The means and methods of controlling, monitoring, and protecting the plant and things that can go wrong are presented. There is also a short discourse on the research carried out in the USA and Germany, aimed at assessing the risks of utilising nuclear energy by means of the incident tree analysis and probability calculations. (DG) [de

  19. Summit Station Skiway Review

    Science.gov (United States)

    2013-03-01

    determine its usefulness for enhancing runway performance. We docu- mented the snow strength with a Rammsonde Cone Penetrometer and de- termined the... Penetrometer and delivered it to Summit during the Phase III turnover in February 2011 so that it would be available for testing during spring skiway...discussed current maintenance practices with the Station Manager, trained staff on proper use of the Rammsonde Cone Penetrometer , inspected current

  20. Rf Station For Ion Beam Staking In Hirfl-csr

    CERN Document Server

    Arbuzov, V S; Bushuev, A A; Dranichnikov, A N; Gorniker, E I; Kendjebulatov, E K; Kondakov, A A; Kondaurov, M; Kruchkov, Ya G; Krutikhin, S A; Kurkin, G Ya; Mironenko, L A; Motygin, S V; Osipov, V N; Petrov, V M; Pilan, Andrey M; Popov, A M; Rashenko, V V; Selivanov, A N; Shteinke, A R; Vajenin, N F

    2004-01-01

    BINP has developed and produced the RF station for Institute of Modern Physics (IMP), Lanzhou, China, for multipurpose accelerator complex with electron cooling. The RF station will be used for accumulation of ion beams in the main ring of the system. It was successfully tested in IMP and installed into the main accelerator ring of the complex. The RF station includes accelerating RF cavity and RF power generator with power supplies. The station works within frequency range 6.0 - 14.0 MHz, maximum voltage across the accelerating gap of the RF cavity - 20 kV. In the RF cavity the 200 VNP ferrite is utilized. A residual gas pressure in vacuum chamber does not exceed 2,5E-11 mbar. Maximum output power of the RF generator 25 kW. The data acquisition and control of the RF station is based on COMPACT - PCI bus and provides all functions of monitoring and control.