WorldWideScience

Sample records for general electric company

  1. 78 FR 56594 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-09-13

    ... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... General Electric Company (GE) GE90-76B, -85B, -90B, -94B, -110B1, and - 115B turbofan engines. This AD was...) Applicability This AD applies to General Electric Company (GE): (1) GE90-76B, -85B, -90B, and -94B turbofan...

  2. 78 FR 72552 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-12-03

    ... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... General Electric Company model GEnx-2B67 and GEnx-2B67B turbofan engines. This AD was prompted by the... certain serial number General Electric Company (GE) model GEnx-2B67 and GEnx-2B67B turbofan engines. The...

  3. 77 FR 4650 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2012-01-31

    ... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... General Electric Company (GE) CF6-45 and CF6-50 series turbofan engines with certain low-pressure turbine... Compliance We estimate that this AD will affect 387 CF6-45 and CF6-50 series turbofan engines installed on...

  4. 78 FR 72567 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-12-03

    ... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... General Electric Company (GE) GE90-110B1 and -115B turbofan engines. This AD was prompted by multiple... turbofan engines with variable bypass valve (VBV) actuator fuel supply tube, part number (P/N) 2165M22P01...

  5. 78 FR 76045 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-12-16

    ... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... (AD) for General Electric Company (GE) GE90-110B1 and GE90-115B turbofan engines with certain high... turbofan engines with high pressure compressor (HPC) rotor stage 2-5 spools, part numbers (P/Ns) 351-103...

  6. 78 FR 38195 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-06-26

    ... Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA), DOT... all General Electric Company (GE) GE90-110B1 and GE90-115B turbofan engines. This emergency AD was.... owners and operators of these GE90-110B1 and GE90-115B turbofan engines. This action was prompted by...

  7. 78 FR 19983 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-04-03

    ... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... Electric Company (GE) CF34-8C and CF34-8E turbofan engines with certain part numbers (P/N) of operability...-8E6, and CF34-8E6A1 turbofan engines, with an operability bleed valve (OBV) part number (P/N...

  8. 78 FR 50320 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-08-19

    ... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... Electric Company (GE) model GEnx-2B67B turbofan engines with booster anti-ice (BAI) air duct, part number...-2B67 turbofan engine be removed from the Applicability section of this AD. The commenters noted that...

  9. 77 FR 3088 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2012-01-23

    ... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... Electric Company (GE) CF34-10E series turbofan engines. This AD was prompted by a report of heavy wear... turbofan engines installed on airplanes of U.S. registry. We also estimate that it will take about 8 work...

  10. 78 FR 47534 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-08-06

    ... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... directive (AD) 2013-14-51 for General Electric Company (GE) GE90-110B1 and GE90-115B turbofan engines with... all known U.S. owners and operators of GE90-110B1 and GE90-115B turbofan engines. AD 2013-14-51...

  11. 78 FR 24671 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-04-26

    ... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... certain General Electric Company (GE) CF6-80C2 series turbofan engines. That AD currently requires.../B1F/B2F/B4F/B6F/B7F/D1F turbofan engines with any of the following installed: (1) Fuel tube, part...

  12. 77 FR 48110 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2012-08-13

    ... Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of proposed... certain General Electric Company (GE) CF6-80C2 series turbofan engines. The existing AD requires... 2000-04-14, Amendment 39-11597 (65 FR 10698, February 29, 2000), for all GE CF6-80C2 series turbofan...

  13. 76 FR 64844 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2011-10-19

    ... Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of proposed... General Electric Company (GE) CF6-45 and CF6-50 series turbofan engines with certain low-pressure turbine... series turbofan engines with certain LPT rotor stage 3 disks installed. That AD requires initial and...

  14. 77 FR 76977 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2012-12-31

    ... Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Supplemental notice... proposed airworthiness directive (AD) for certain General Electric Company (GE) CF6-80C2 series turbofan... part 39 to include an AD that would apply to certain GE CF6-80C2 series turbofan engines. That NPRM...

  15. 77 FR 58471 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2012-09-21

    ... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA.../P1, GEnx-1B75/P1, GEnx- 2B67, and GEnx-2B67B turbofan engines. This AD requires initial and... this AD will affect 11 GE GEnx turbofan engines installed on airplanes of U.S. registry. We also...

  16. 78 FR 44899 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-07-25

    ... Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of proposed... Electric Company (GE) GE90-110B1 and -115B turbofan engines. This proposed AD was prompted by multiple...) 2165M22P01, installed on GE90-110B1 and -115B turbofan engines. One of the leaks led to an under cowl engine...

  17. 78 FR 19628 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-04-02

    ... Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of proposed... Electric Company (GE) GE90-76B, -85B, -90B, -94B, - 110B1, and -115B turbofan engines. This proposed AD was... of stage 1 HPT stator shroud distress resulting in engine removals on airplanes with GE90 turbofan...

  18. 77 FR 74125 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2012-12-13

    ... Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of proposed... Company (GE) CF34-8C and CF34-8E turbofan engines with certain part numbers (P/N) of operability bleed... received reports of three failure events of OBV ring lock fuel fittings on GE CF34-8C turbofan engines. Two...

  19. 78 FR 21578 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-04-11

    ... Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of proposed... Company (GE) model GEnx-2B67 and GEnx-2B67B turbofan engines with booster anti-ice (BAI) air duct, part... GE model GEnx-2B67 and GEnx- 2B67B turbofan engines with BAI air duct, P/N 2469M32G01, and support...

  20. 78 FR 47235 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-08-05

    ... cycle counts of those LLPs to account for the additional low cycle fatigue (LCF) life consumed during... Boeing 747-8 flight tests had consumed more cyclic life than they would have in revenue flight cycles... Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of proposed...

  1. 76 FR 68634 - Airworthiness Directives; General Electric Company (GE) CF6 Turbofan Engines

    Science.gov (United States)

    2011-11-07

    ... Airworthiness Directives; General Electric Company (GE) CF6 Turbofan Engines AGENCY: Federal Aviation... ``(c) This AD applies to * * * and CF6-80A3 turbofan engines with left-hand links * * *.'' to ``(c) This AD applies to * * * and CF6-80A3 turbofan engines, including engines marked on the engine data...

  2. 75 FR 47644 - General Electric Company, Transportation Division, Including On-Site Leased Workers From Adecco...

    Science.gov (United States)

    2010-08-06

    ... DEPARTMENT OF LABOR Employment and Training Administration [TA-W-71,174] General Electric Company... that was totally or partially separated from employment. It was determined, however, that imports of... Globalization Adjustment Assistance Act of 2009, section 222 of the Act (19 U.S.C. 2272) covers foreign...

  3. Electric Holding Company Areas

    Data.gov (United States)

    Department of Homeland Security — Holding companies are electric power utilities that have a holding company structure. This vector polygon layer represents the area served by electric power holding...

  4. Attitudes of the general public and electric power company employees toward nuclear power generation

    International Nuclear Information System (INIS)

    Komiyama, Hisashi

    1997-01-01

    We conducted an awareness survey targeted at members of the general public residing in urban areas and in areas scheduled for construction of nuclear power plants as well as employees of electric power company in order to determine the awareness and attitude structures of people residing near scheduled construction sites of nuclear power plants with respect to nuclear power generation, and to examine ways of making improvements in terms of promoting nuclear power plant construction sites. Analysis of those results revealed that there are no significant differences in the awareness and attitudes of people residing in urban areas and in areas near scheduled construction sites. On the contrary, a general sense of apprehension regarding the construction of nuclear power plants was observed common to both groups. In addition, significant differences in awareness and attitudes with respect to various factors were determined to exist between members of the general public residing in urban areas and scheduled construction sites and employees of electric power company. (author)

  5. Vacuum education courses at the General Electric Company's Neutron Devices Department, St. Petersburg, Florida

    International Nuclear Information System (INIS)

    Provo, J.L.; Brown, W.C.

    1978-01-01

    Vacuum Technology has, from the beginning, played a key role in the production of the Department's products at the General Electric Company's Neutron Devices Department (GEND). Early recognition was given to the need for vacuum education and training for producing and maintaining vacuums to meet departmental objectives. The vacuum courses taught at GEND are described. These include basic Vacuum Technology, Advanced Vacuum Technology, and specialized vacuum related courses. Course offering rationale, outlines of subject matter covered and criteria for measuring effectiveness will be presented for each course. Such vacuum technology related courses have resulted in improved GEND product quality and in reducing losses and production cost. At the same time, these courses have given participating employees career motivation for fulfilling more challenging vacuum technology job related positions and have enabled them to achieve upward mobility in the Department's work force

  6. Analysis of the General Electric Company swell tests with RELAP4/MOD7

    International Nuclear Information System (INIS)

    Fischer, S.R.; Hendrix, C.E.

    1979-01-01

    The RELAP4/MOD7 nuclear reactor transient analysis code, presently being developed by EG and G Idaho, Inc., will incorporate several significant improvements over earlier versions of RELAP4. As part of the development of RELAP4/MOD7, a thorough assessment of the capability of the code to simulate water reactor LOCA phenomena is being made. This assessment is accomplished in part by comparing results from code calculations with test data from experimental facilities. Simulations of the General Electric Company (GE) level swell tests were performed as part of the code checkout. In these tests, a pressurized vessel partially filled with nearly saturated water was blown down through a simulated break located near the top of the vessel. Comparison of RELAP4 calculations with data from these experiments indicates that the code has the capability to model the unequal phase velocity flow and resulting density gradients that might occur in a BWR steam line break transient. Comparisons of RELAP4 calculations with data from two level swell experiments are presented

  7. NRC [Nuclear Regulatory Commission] staff evaluation of the General Electric Company Nuclear Reactor Study (''Reed Report'')

    International Nuclear Information System (INIS)

    1987-07-01

    In 1975, the General Electric Company (GE) published a Nuclear Reactor Study, also referred to as ''the Reed Report,'' an internal product-improvement study. GE considered the document ''proprietary'' and thus, under the regulations of the Nuclear Regulatory Commission (NRC), exempt from mandatory public disclosure. Nonetheless, members of the NRC staff reviewed the document in 1976 and determined that it did not raise any significant new safety issues. The staff also reached the same conclusion in subsequent reviews. However, in response to recent inquiries about the report, the staff reevaluated the Reed Report from a 1987 perspective. This re-evaluation, documented in this staff report, concluded that: (1) there are no issues raised in the Reed Report that support a need to curtail the operation of any GE boiling water reactor (BWR); (2) there are no new safety issues raised in the Reed Report of which the staff was unaware; and (3) although certain issues addressed by the Reed Report are still being studied by the NRC and the industry, there is no basis for suspending licensing and operation of GE BWR plants while these issues are being resolved

  8. Troubleshooting the General Electric Company Neutron Devices Department's deionized water system

    International Nuclear Information System (INIS)

    Gillespie, T.J.

    1983-01-01

    In May 1982, the General Electric Neutron Devices Department's deionized (DI) water system was found to be highly contaminated with fresh water roundworms which caused severe filter plugging problems. Subsequently, a DI water improvement program was developed by GEND's Process Technology, Contamination Control, and Facilities Engineering groups. This program included removal of dead ends in the distribution system, a consultant's review, significant modification of the DI water system, modification of system operation, design of a quality plan, and changes in the types of water analysis. During implementation of the improvement program, a severe bacteria contamination problem occurred due to a contractor accident. Correction of this problem required sterilization of portions of the DI water system and significant modification of the water filtration system. The system modifications and sterilization procedures have significantly reduced bacteria and total solids contamination while resistivity is generally increasing

  9. Use and benefit summary of General Electric Company thermocase insulated tubulars for steam enhanced oil recovery

    Energy Technology Data Exchange (ETDEWEB)

    Traynor, B.V. Jr.; Hawley, J.R.; Marziani, V.J.; Prevost, W.M.

    1982-01-01

    General Electric Co.'s (GE) first well-bore insulation in 1969 resulted from the industry's need to produce hot oil on Alaska's North Slope without damaging the permafrost. In the past 3 yr, over 500,000 linear ft of GE's Thermocase has been sold. Thermocase tubulars are in use in California, Wyoming, Texas, Canada, Venezuela, and the USSR. Thermocase insulated tubulars are being used in a wide range of reservoirs under a variety of completion designs. This study discusses field experience, thermal completion benefits afforded by Thermocase tubulars, a quantified economic evaluation in a 1000-ft application, as well as GE's product verification, test and rigid quality control program.

  10. General Electric Company proposed test and evaluation plan, commercial buildings. National Solar Demonstration Program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1976-04-01

    The general requirements and methods for instrumenting, testing, and evaluating solar HVAC systems forming a part of ERDA's ''Commercial Demonstration Program'' commensurate with ERDA 23A and the Proposed Management Plan 75SDS4270 are defined. Design requirements are specified for the performance of components and subsystems comprising the instrumentation and data gathering system, as well as the support functions required to perform the diagnostic measurements, collection and processing of data, and documentation of reports on solar HVAC system performance, including economic and societal evaluations.

  11. The Electric Company Writers' Notebook.

    Science.gov (United States)

    Children's Television Workshop, New York, NY.

    This handbook outlines the curriculum objectives for the children's television program, "The Electric Company." The first portion of the text delineates strategies for teaching symbol/sound analysis, including units on blends, letter groups, and word structure. A second section addresses strategies for reading for meaning, including…

  12. TRAC development at General Electric

    International Nuclear Information System (INIS)

    Andersen, J.G.M.; Shaug, J.C.; Shiralkar, B.S.

    1987-01-01

    TRAC is a computer code for transient analysis of light water reactors. The BWR version of TRAC has been developed as a result of a close cooperation between General Electric Company and Idaho National Engineering Laboratory. Up through 1985 the development work at General Electric was jointly funded by General Electric, the Nuclear Regulatory Commission and Electric Power Research Institute under the Refill-Reflood and FIST programs. At INEL (which has the main responsibility for the NRC version of TRAC-BWR) this work has led to the development of TRACBD1 and TRACBF1, while at GE, TRACB04 was the final product of the Refill-Reflood and FIST programs. TRAC development has continued at General Electric after the completion of these programs with the evolution of the TRACG code. The purpose of the paper is to describe this work. The TRAC development at General Electric can be divided into two main categories: extended benchmark capability and improved user convenience

  13. The roles played by the Canadian General Electric Company's Atomic Power Department in Canada's nuclear power program: work, organization and success in APD, 1955-1995

    International Nuclear Information System (INIS)

    Cantello, G.W.

    2003-01-01

    This thesis explores the roles played by the Canadian General Electric Company's Atomic Power Department (APD) in Canada's distinctive nuclear power program. From the establishment of APD in 1955 until the completion of the KANUPP project in Pakistan in 1972, the company's strategy encompassed the design, manufacture, and commissioning of entire nuclear power projects in Canada and abroad. APD then developed a specialized role in the design and supply of complete nuclear fuel handling systems, nuclear fuel bundles, and service work, that sustained a thriving workplace. Five key factors are identified as the reasons behind the long and successful history of the department: (1) Strong, capable and efficient management from the start, (2) Flexible organizational structure, (3) Extremely competent design group, (4) Excellent manufacturing, test, commissioning and service capabilities, (5) Correctly identifying, at the right time, the best fields in which to specialize. (author)

  14. 75 FR 43099 - Airworthiness Directives; General Electric Company (GE) CT7-9C and -9C3 Turboprop Engines

    Science.gov (United States)

    2010-07-23

    ... balance-cuts can negatively affect the low-cycle fatigue life capability of the shaft. This condition, if... Company (GE) CT7-9C and -9C3 Turboprop Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION... nonconforming GGT shaft land balance-cuts, which could result in the shaft failing before its published life...

  15. Portland General Electric Company report on the operating and startup experience with control and instrumentation and electrical systems at the Trojan Nuclear Plant

    International Nuclear Information System (INIS)

    Zimmerman, G.A.

    1977-01-01

    The Trojan Nuclear Plant is an 1178 MWe nuclear plant located on the Columbia River 40 miles northwest of Portland, Oregon. The Nuclear Stream Supply System vendor is Westinghouse with a General Electric turbine generator. The reactor is rated and licensed for 3423 MWt (1178 MWe) and the turbine generator is designed for 3570 MWt(1219 MWe). The startup phase testing of Trojan commenced on November 21, 1975, upon receipt of our NRC Operating License. The startup testing program was completed on May 22, 1976, following 100 hours of full-power operation, at which time a scheduled summer maintenance outage began. Some of the highlights and milestones of the startup testing program are described

  16. Hawaiian Electric Company Demand Response Roadmap Project

    Energy Technology Data Exchange (ETDEWEB)

    Levy, Roger [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Kiliccote, Sila [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2013-01-12

    The objective of this project was to develop a “roadmap” to guide the Hawaiian Electric Company (HECO) demand response (DR) planning and implementation in support of the Hawaii Clean Energy Initiative (HCEI) 70% clean energy goal by 2030.

  17. 76 FR 27282 - Airworthiness Directives; General Electric Company CF34-10E2A1; CF34-10E5, CF34-10E5A1; CF34-10E6...

    Science.gov (United States)

    2011-05-11

    ... methods: Federal eRulemaking Portal: Go to http://www.regulations.gov . Follow the instructions for... Investigation of a General Electric Company (GE) CF34-10E turbofan engine experiencing high fan frame vibrations... likely to exist or develop in other products of the same type design. Proposed AD Requirements This...

  18. Experience of electric power conservation in COELBA (Bahia Electric Company)

    International Nuclear Information System (INIS)

    Bastos, A.C.F.

    1990-01-01

    The electric power crisis of Brazilian north-east in 1987 imposes the Bahia Electric Company-COELBA to management a electric power conservation. The institutional, organizational and operational aspects are presented, including the tariff system, the market, the consumption and the relation with public. (author)

  19. General Electric Company analytical model for loss-of-coolant analysis in accordance with 10CFR50 appendix K. Volume II

    International Nuclear Information System (INIS)

    1976-01-01

    Documentation for the General Electric Evaluation Model is presented. Computer codes and numerical methods common to the codes are described. It is shown how GE BWR's conform to the Acceptance Criteria of 10CFR50.46

  20. Memorial 1997 - ENDESA (Chilean Electricity Company)

    International Nuclear Information System (INIS)

    1998-01-01

    This report provides a comprehensive survey, in depth assessment of the activities overview of ENDESA, Chilean Electricity Company, highlighting economical information and including historical and technical aspects. Economics is its focal point, but other relevant data are shown, like technical data on hydroelectric and thermoelectric power plants. Main activities developed by ENDESA are described, such in Chile as in the foreign. Data on power generation, transmission and transport are also presented and an economical balance of each colligated company are done and analysed

  1. MODERN ELECTRIC CARS OF TESLA MOTORS COMPANY

    OpenAIRE

    O. F. Vynakov; E. V. Savolova; A. I. Skrynnyk

    2016-01-01

    This overview article shows the advantages of a modern electric car as compared with internal combustion cars by the example of the electric vehicles of Tesla Motors Company. It (в смысле- статья) describes the history of this firm, provides technical and tactical characteristics of three modifications of electric vehicles produced by Tesla Motors. Modern electric cars are not less powerful than cars with combustion engines both in speed and acceleration amount. They are reliable, economical ...

  2. MODERN ELECTRIC CARS OF TESLA MOTORS COMPANY

    Directory of Open Access Journals (Sweden)

    O. F. Vynakov

    2016-08-01

    Full Text Available This overview article shows the advantages of a modern electric car as compared with internal combustion cars by the example of the electric vehicles of Tesla Motors Company. It (в смысле- статья describes the history of this firm, provides technical and tactical characteristics of three modifications of electric vehicles produced by Tesla Motors. Modern electric cars are not less powerful than cars with combustion engines both in speed and acceleration amount. They are reliable, economical and safe in operation. With every year the maximum range of an electric car is increasing and its battery charging time is decreasing.Solving the problem of environmental safety, the governments of most countries are trying to encourage people to switch to electric cars by creating subsidy programs, lending and abolition of taxation. Therefore, the advent of an electric vehicle in all major cities of the world is inevitable.

  3. Electric utility companies and geothermal power

    Science.gov (United States)

    Pivirotto, D. S.

    1976-01-01

    The requirements of the electric utility industry as the primary potential market for geothermal energy are analyzed, based on a series of structured interviews with utility companies and financial institution executives. The interviews were designed to determine what information and technologies would be required before utilities would make investment decisions in favor of geothermal energy, the time frame in which the information and technologies would have to be available, and the influence of the governmental politics. The paper describes the geothermal resources, electric utility industry, its structure, the forces influencing utility companies, and their relationship to geothermal energy. A strategy for federal stimulation of utility investment in geothermal energy is suggested. Possibilities are discussed for stimulating utility investment through financial incentives, amelioration of institutional barriers, and technological improvements.

  4. 76 FR 24465 - Pacific Gas and Electric Company

    Science.gov (United States)

    2011-05-02

    ... Electric Company Notice of Application Tendered for Filing With the Commission and Establishing Procedural... Gas and Electric Company. e. Name of Project: Drum-Spaulding Project. f. Location: The west slope of..., Pacific Gas and Electric Company, P.O. Box 770000, San Francisco, CA 94177-0001, (415) 973-4481, or e-mail...

  5. Electricity Self-Generation Costs for Industrial Companies in Cameroon

    Directory of Open Access Journals (Sweden)

    Diboma Benjamin Salomon

    2010-07-01

    Full Text Available Industrial production in developing countries (DC is frequently perturbed by electric energy supply difficulties. To overcome this problem, generators are used in self-generation of energy, but this leads to an increase of electricity-related expenses. This article assesses the impact of electricity self-generation on Cameroonian industrial companies. The model described in this article is based on data collected through a survey of a representative sample of industrial companies and from numerous previous thematic and statistical studies. The results of our analyses show that expenses related to electricity in industrial companies in Cameroon have increased five times due to electricity rationing and untimely power cuts. The article also suggests some solutions to improve the electricity self-generation capacity of industrial companies.

  6. Industrial companies' demand for electricity. Evidence from a micropanel

    International Nuclear Information System (INIS)

    Bjoerner, T.B.; Togeby, M.; Jensen, H.H.

    2001-01-01

    The paper presents a micro-econometric analysis of industrial companies' demand for electricity. Previous studies on electricity consumption in the industrial sector have relied on aggregate data or cross-section observations. Here we present an econometric study on electricity demand based on a panel of 2949 Danish companies followed from 1983 to 1996. It is found that estimators of electricity demand that take account of the panel structure (fixed effect models) yield considerably lower price and production elasticities compared to estimators that do not (like cross-section models). It is also investigated how various company characteristics like size, type of industrial sub-sector and electricity intensity in production influence price and production elasticities. It appears that companies with a high electricity intensity also have a high own-price elasticity

  7. 78 FR 72877 - Arkansas Electric Corporation v. Oklahoma Gas and Electric Company; Notice of Complaint

    Science.gov (United States)

    2013-12-04

    ... Electric Corporation v. Oklahoma Gas and Electric Company; Notice of Complaint Take notice that on November... Commission (Commission), 18 CFR 385.206, Arkansas Electric Corporation (Complainant) filed a formal complaint against Oklahoma Gas and Electric Company (Respondents), alleging that the Respondent's Production Formula...

  8. LOGISTICS ASPECTS OF PRACTICAL MARKETING IN ELECTRICITY COMPANY

    OpenAIRE

    Ewa Moroz

    2008-01-01

    An anonymous questionnaire was presented to employees of an electricity distribution company - Enion Grupa Tauron S.A. – Department Czestochowa. The research, in the part presented in this paper, referred to company-customer relations and to an influence that those relations have on costs and quality of work in the company, mainly in the aspect of employees’ understanding of those connections. In the paper author states the conclusion that suggests implementation of Lean Thinking procedures i...

  9. 78 FR 43197 - Duke Energy Florida, Inc.; Florida Power & Light Company; Tampa Electric Company; Orlando...

    Science.gov (United States)

    2013-07-19

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ER13-1922-000; ER13-1929-000; ER13-1932-000; NJ13-11-000] Duke Energy Florida, Inc.; Florida Power & Light Company; Tampa Electric Company; Orlando Utilities Commission; Notice of Compliance Filings Take notice that on July 10, 2013, Duke Energy...

  10. Models and strategies for electricity distribution companies in emerging economies

    Science.gov (United States)

    Zaragocin Espinosa, Leonardo Vicente

    Unbundling and privatization have become key elements of restructuring in the Electric Power Industry of Emerging Economies. These processes have concentrated on the Generation and Transmission areas, leaving Distribution as lower priority. Based on a comparison between the old role of Distribution Companies (DISCOS) and its new potential role this study identifies the main issues and challenges that DISCOS will face in the new environment once structural and ownership changes are completed. For the specific case of DISCOS in Emerging Economies, regulatory policies are reviewed and strategies identified in order to facilitate the transition and to assist in the integration of DISCOS with other agents in the evolving electric power market. Of particular importance in this research is the analysis of the role of Energy Efficiency (EE) in the new structural and governance environment. A theoretical study of the effects of energy efficiency measures, specifically loss reduction, on price regulation is developed within a proposed regulatory regime of privatization together with Price-Cap Regulation. This theoretical benchmark is then used as a starting point for a case study, the Electric System of Ecuador, where an analysis of the current Ecuadorian price regulation scheme (the Distribution Value Added Charge, VAD, scheme) is presented and analyzed in detail. General recommendations for improving the application of the VAD pricing approach are advanced, with special reference to the current situation in Ecuador.

  11. Evaluation of efficiency in Japan electric power companies

    International Nuclear Information System (INIS)

    Ghaderi, F.; Muyajima, M.

    2001-01-01

    Achieving energy efficiency also must consider supply efficiency, how much energy it takes to generate electricity and transmit it to the end user. system efficiency reflects the loss of energy during the processes of generation, transmission and distribution of electricity. Of the millions of tons of coal that are burned to produce heat in generation of electricity every year, only one third is converted into electricity.The electric power plant immediately uses 5 to 10 percent of that energy for use in the plant. Around another 10 percent of this energy is consumed in the transmission and distribution of electric energy to end users. Overall,more that 70 percent of the energy used to produce and deliver electricity never gets to the end user. The costs of this wasted energy are reflected in the customer's electricity bill. Furthermore, once delivered, users of electricity are subjected to more h idden c osts the demand charge which reflects the rate at which consumers draw energy from the power plant during a particular time of day, are also affected by the time of year. This additional charge c n be dramatic. For example, the cost for using electric air conditioning at the w rong t ime of the day , are also affected by the time of year. This additional charge can be dramatic. For example, the cost for using electric air conditioning at the wrong time of the day could be as much as 25 to 40 percent higher than what a facility normally pays for electricity during off-peak times. Minimizing the costs of operations, therefor, is a must for all electric companies. In the other hand utility rates, such as the cost of electricity, are a necessary element of operating in all enterprises.In some industries the payment over electricity make a large percentage of their total expenses, but that doesn't mean that every effort should not be made to reduce their impact on the bottom line, it should be considered that a very small change in operating procedure can change

  12. Explaining the inefficiency of electrical distribution companies. Peruvian firms

    Energy Technology Data Exchange (ETDEWEB)

    Perez-Reyes, Raul [Organismo Supervisor de la Inversion en Energia y Mineria, OSINERGMIN (Peru); Tovar, Beatriz [Infrastructure and Transport Research Group (EIT), Department of Applied Economics, University of Palmas de Gran Canaria (Spain)

    2010-09-15

    This paper investigates the extent to which the structural reform of the Peruvian electricity market, implemented in the 1990s, has improved the efficiency of the distribution companies; and it evaluates the influence on efficiency of firm specific explanatory variables. To do this, we rely on data from 14 distribution companies between 1996 and 2006. The results indicate that the incentives generated by the reform process led to the firms becoming more efficient. Moreover, the time trend and private management of the distribution companies are variables that positively affect the levels of efficiency, whereas the lower network densities are then the greater the inefficiency. (author)

  13. Explaining the inefficiency of electrical distribution companies. Peruvian firms

    International Nuclear Information System (INIS)

    Perez-Reyes, Raul; Tovar, Beatriz

    2010-01-01

    This paper investigates the extent to which the structural reform of the Peruvian electricity market, implemented in the 1990s, has improved the efficiency of the distribution companies; and it evaluates the influence on efficiency of firm specific explanatory variables. To do this, we rely on data from 14 distribution companies between 1996 and 2006. The results indicate that the incentives generated by the reform process led to the firms becoming more efficient. Moreover, the time trend and private management of the distribution companies are variables that positively affect the levels of efficiency, whereas the lower network densities are then the greater the inefficiency. (author)

  14. Research on service strategy of electricity selling company under the reform of electricity market

    Science.gov (United States)

    Long, Zhuhan; Meng, Shiyu; Dou, Jinyue; Zeng, Ming; Sun, Chenjun

    2017-10-01

    The opening of the sale side of electricity market is an important goal of the new round of power system reform in China, and it is necessary to speed up the establishment and development of the electricity selling companies to achieve this goal. First of all, this paper defines the key problems, which are needed to be solved in the establishment of the sale side market, such as demand side response, optimization of users' power consumption mode, profit mode of electricity selling companies and fair competition in the market. On this basis, this paper analyzes the business of electricity selling company, from the aspects of the transition of business ideas, improving the energy efficiency level, providing integrated energy solutions and innovating business management mode; and then, the service strategies of electricity selling companies are put forward.

  15. 78 FR 54691 - American General Life Insurance Company, et al.

    Science.gov (United States)

    2013-09-05

    ... SECURITIES AND EXCHANGE COMMISSION [Release No. IC-30681; File No. 812-13973] American General Life Insurance Company, et al. August 29, 2013, AGENCY: The Securities and Exchange Commission (``Commission''). ACTION: Notice of application for an order under Section 6(c) of the Investment Company Act of...

  16. Internet Resources for Reference: General Business and Company Information.

    Science.gov (United States)

    Mai, Brent Alan

    1997-01-01

    Outlines a few of the thousands of Internet sites that are helpful in obtaining general business information and company-specific information, including company directories and homepages, telephone directories, Chambers of Commerce, marketing and advertising, agribusiness, government, cost of living, business schools, and nonprofit business.…

  17. 76 FR 61687 - Pacific Gas and Electric Company

    Science.gov (United States)

    2011-10-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2479-011-CA] Pacific Gas and Electric Company Notice of Availability of Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission...

  18. The development strategies of the european electric power companies

    International Nuclear Information System (INIS)

    Heddebaud, D.

    2005-01-01

    This study takes stock on the european market of the electric power and of its development perspectives. It details the strategy and the place of the main operators and shows their forces and weaknesses. It provides a comparison of the financial performances of 28 companies (growth, margins, profitability, debt and war chest). (A.L.B.)

  19. Profiting from competition: Financial tools for electric generation companies

    Science.gov (United States)

    Richter, Charles William, Jr.

    Regulations governing the operation of electric power systems in North America and many other areas of the world are undergoing major changes designed to promote competition. This process of change is often referred to as deregulation. Participants in deregulated electricity systems may find that their profits will greatly benefit from the implementation of successful bidding strategies. While the goal of the regulators may be to create rules which balance reliable power system operation with maximization of the total benefit to society, the goal of generation companies is to maximize their profit, i.e., return to their shareholders. The majority of the research described here is conducted from the point of view of generation companies (GENCOs) wishing to maximize their expected utility function, which is generally comprised of expected profit and risk. Strategies that help a GENCO to maximize its objective function must consider the impact of (and aid in making) operating decisions that may occur within a few seconds to multiple years. The work described here assumes an environment in which energy service companies (ESCOs) buy and GENCOs sell power via double auctions in regional commodity exchanges. Power is transported on wires owned by transmission companies (TRANSCOs) and distribution companies (DISTCOs). The proposed market framework allows participants to trade electrical energy contracts via the spot, futures, options, planning, and swap markets. An important method of studying these proposed markets and the behavior of participating agents is the field of experimental/computational economics. For much of the research reported here, the market simulator developed by Kumar and Sheble and similar simulators has been adapted to allow computerized agents to trade energy. Creating computerized agents that can react as rationally or irrationally as a human trader is a difficult problem for which we have turned to the field of artificial intelligence. Some of our

  20. General Electric Company analytical model for loss-of-coolant analysis in accordance with 10CFR50 appendix K, amendment No. 3: effect of steam environment on BWR core spray distribution

    International Nuclear Information System (INIS)

    1977-04-01

    The core spray sparger designs of the BWR/2 through BWR/5 product lines were verified by means of full-scale mock-ups tested in air at various flow conditions. In 1974, an overseas technical partner of General Electric reported that a steam environment changed the individual core spray nozzle patterns when compared to patterns measured in air. This document describes preliminary findings of how a steam environment alters the core spray nozzle pattern, and the actions which General Electric is pursuing to quantify the steam effects

  1. Memorial 1997 - ENDESA (Chilean Electricity Company); ENDESA - Memoria 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-12-31

    This report provides a comprehensive survey, in depth assessment of the activities overview of ENDESA, Chilean Electricity Company, highlighting economical information and including historical and technical aspects. Economics is its focal point, but other relevant data are shown, like technical data on hydroelectric and thermoelectric power plants. Main activities developed by ENDESA are described, such in Chile as in the foreign. Data on power generation, transmission and transport are also presented and an economical balance of each colligated company are done and analysed 35 figs., 115 tabs.

  2. Smart Grid Innovation Management for SME Electricity Companies

    DEFF Research Database (Denmark)

    Tambo, Torben

    2011-01-01

    innovation process lies ahead for utility companies in screening, testing, maturing, implementing and operating smart grids. This process is expected to follow the political targets for CO2 reduction stretching forward until 2050. As no proven concepts exists, and as the process is expected to progress many...... years ahead, smart grid represents an excellent case of continuous innovation. The current study use a series of loosely related technological studies of smart grid related technologies in SME electricity companies to highlight critical issues in this innovation process. Major findings...... are that the companies have limited innovation capabilities, they are presented with plenty of technological offerings that eventually have to be rejected, and they suffer from absence of clear objectives....

  3. GENERAL CONSIDERATIONS ON THE DISSOLUTION AND LIQUIDATION OF ROMANIAN COMPANIES

    Directory of Open Access Journals (Sweden)

    Elena Cristina Baciu

    2012-03-01

    Full Text Available All stakeholders are interested in whether a firm has a good and stable financial situation, even though they all have different stakes in it. However, not all companies can succeed and operate profitably. The purpose of the study is to examine the peculiarities of dissolution and liquidation in Romania and the characteristics of liquidation of companies, according to their legal form. From examining the general causes of dissolution to specifics of different type of companies, all elements have a great importance in understanding how to avoid this procedure.

  4. The development of multimedia communication system for electric power company

    Energy Technology Data Exchange (ETDEWEB)

    Woo, Hee Gon; Kim, Seong Bok [Korea Electric Power Corp. (KEPCO), Taejon (Korea, Republic of). Research Center

    1995-12-31

    It is a final report of the research project that is a development of PC-LAN based multimedia desktop conference system, which is research on the essential technologies and application and development of multimedia communication services for electric power company. This report is consisted of -Survey and study of the multimedia related technologies, -Multimedia communication protocols and network configurations, and -Design, developments of pilot model, evaluation, and applications of multimedia conference system. (author). 112 refs., 250 figs.

  5. The development of multimedia communication system for electric power company

    Energy Technology Data Exchange (ETDEWEB)

    Woo, Hee Gon; Kim, Seong Bok [Korea Electric Power Corp. (KEPCO), Taejon (Korea, Republic of). Research Center

    1996-12-31

    It is a final report of the research project that is a development of PC-LAN based multimedia desktop conference system, which is research on the essential technologies and application and development of multimedia communication services for electric power company. This report is consisted of -Survey and study of the multimedia related technologies, -Multimedia communication protocols and network configurations, and -Design, developments of pilot model, evaluation, and applications of multimedia conference system. (author). 112 refs., 250 figs.

  6. Own power: Motives of having electricity without the energy company

    International Nuclear Information System (INIS)

    Leenheer, Jorna; Nooij, Michiel de; Sheikh, Omer

    2011-01-01

    New technologies will enable households to generate an increasing amount of their own electricity. Intentions to generate own power are a preliminary step towards actual behavior. Because own generation is still very limited and the behavior of early adopters may not be representative for the complete population, our study focuses on intentions rather than actual behavior. A consumer survey among 2047 Dutch households reveals that environmental concerns are the most important driver of a household's intention to generate its own power. Affinity with technology and energy and the reputation of electricity companies are also significant drivers, but financial factors and power outages are not. About 40% of Dutch households have an intention to generate their own power, with an overrepresentation of young households. This group falls apart in two sub segments; for the 'generating savers' (21%) a high intention to generate own power coincides with a high intention to save energy, whereas generating users (18%) combine a high intention to generate own power with a low intention to save energy. - Highlights: → A consumer survey studies household intentions to generate own power. → Environmental concerns are the most important motive for generating own power. → Other drivers are affinity with technology and reputation of electricity companies. → About 40% of Dutch households feel a need to generate their own electricity.

  7. RETRAN experience with BWR transients at Yankee Atomic Electric Company

    International Nuclear Information System (INIS)

    Ansari, A.A.F.; Cronin, J.T.; Slifer, B.C.

    1981-01-01

    Yankee Atomic Electric Company is actively involved in the development of licensing methods for BWR's. The computer code chosen for analyzing system response under transient conditions is RETRAN. This paper describes the RETRAN model developed for Vermont Yankee, and the results of the RETRAN checkout and qualification that has been achieved at YAEC through comparison of RETRAN predictions to the startup test results performed at the plant as part of the 100% power startup test program. In addition, abnormal operational transients typically analyzed for licensing are also presented

  8. Efficiency and regulation of the Slovenian electricity distribution companies

    International Nuclear Information System (INIS)

    Filippini, Massimo; Hrovatin, Nevenka; Zoric, Jelena

    2004-01-01

    The Slovenian Energy Law, adopted in 1999, has opened the internal market to competition up to 64% of the final consumption. The opening of the internal market to foreign competition is envisaged for 2003. With regard to the methodology of price regulation, the Energy Law introduces the 'price-cap' regulation, which aims to give firms incentive for cost reduction. To provide information for effective price regulation, we estimated a cost frontier function on a sample of Slovenian electricity distribution utilities over the 1991-2000 period. The estimated efficient frontier could be used by Slovenian regulatory agency as a benchmark to regulate network access prices. Our results show that Slovenian distribution companies are cost inefficient. We have also proved the presence of increasing returns to scale with most utilities not achieving the minimum efficient scale. Thus, the Slovenian regulatory authority should consider how to induce mergers of small electricity distribution utilities into larger units

  9. Sale of electric energy: the case of Electric Power Company of Santa Catarina State (CELESC)

    International Nuclear Information System (INIS)

    Aurich, D.S.

    1990-01-01

    An electric power system assuring the electric supply to the investor client was developed by CELESC, linking the sale resources to one generation construction. It was related the cost of enlargement work from Pery plant, with the participation of Manville Forest Products in the investments. The economic aspects of this contract are presented, including the supply assure, the costs and the advantage each company will receive. (C.G.C.)

  10. Fuel cells and electricity companies - new risk management opportunities

    International Nuclear Information System (INIS)

    Whale, M.

    2004-01-01

    'Full text:' Deregulation, distributed generation, combined heat and power, renewables, fuel cells, hydrogen. Power companies are facing a rapidly evolving environment that is testing their ability to effectively deploy capital and earn profits. While recent deregulation trends have shifted the structure of power markets into separating generators from distributors, the improving economic value proposition offered by smaller scale distributed generation technologies - such as fuel cells - would seem to be a conflicting development. In this complex and changing environment, decisions based on the economic reality of the capital markets are likely to prevail. By examining the opportunity to enhance risk management offered by stationary fuel cells, particularly in CHP applications, we provide a context for the issues being discussed in today's sessions focusing on power companies and electric utilities. Our risk management perspective suggests a pathway for implementing fuel cells in combined heat and power applications that large power generators can introduce in increasingly smaller sizes. With capital costs of fuel cells high and risk tolerance of power companies low, the challenge for smaller technology developers will be to reduce the apparently long time horizon that persists for substantial deployment. (author)

  11. The energy efficiency partnership - Kraft General Foods and Boston Edison Company

    International Nuclear Information System (INIS)

    Crowley, J.C.; Donoghue, J.P.

    1993-01-01

    During the past twenty years, inordinate shifts in the supply and demand of energy have forced both electric utility companies and their customers to investigate new and innovative ways to satisfy the ever increasing demand for electricity. The Energy Efficiency Partnership, developed between Kraft General Foods and Boston Edison Company, presents an exemplary study of how two corporate giants creatively solved the problem of uncontrolled energy costs and its positive effect on the overall operations of Kraft General Foods, Framingham. But the Energy Efficiency Partnership did more than reduce energy costs, it provided benefits to all parties on the playing field. To understand its significance, a review of the partnership's history is paramount. The first official announcement of the Energy Efficiency Partnership was made on April 9, 1990. Framingham, MA, The Commonwealth of Massachusetts Kraft General Foods Framingham, and Boston Edison Company have joined forces in a $3.6 million dollar energy partnership that will help keep 250 industrial jobs in Massachusetts and could lead to the future expansion of the international food company's Framingham facility

  12. 75 FR 54618 - CAlifornians for Renewable Energy, Inc. (CARE) v. Pacific Gas and Electric Company, Southern...

    Science.gov (United States)

    2010-09-08

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL10-84-000] CAlifornians for Renewable Energy, Inc. (CARE) v. Pacific Gas and Electric Company, Southern California Edison Company, San Diego Gas & Electric Company, California Public Utilities Commission; Notice of Complaint...

  13. 75 FR 66744 - Californians for Renewable Energy, Inc. (CARE) v. Pacific Gas and Electric Company, Southern...

    Science.gov (United States)

    2010-10-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL10-84-001] Californians for Renewable Energy, Inc. (CARE) v. Pacific Gas and Electric Company, Southern California Edison Company, San Diego Gas & Electric Company, California Public Utilities Commission; Notice of Amended...

  14. 75 FR 67770 - General Motors Company, Formerly Known as General Motors Corporation, Orion Assembly Plant...

    Science.gov (United States)

    2010-11-03

    ..., Formerly Known as General Motors Corporation, Orion Assembly Plant, Including On-Site Leased Workers From Aerotek Automotive, Ryder and Premier Manufacturing Support Services, Lake Orion, MI; Amended... of General Motors Company, formerly known as General Motors Corporation, Orion Assembly Plant, Lake...

  15. 75 FR 1622 - Decision To Evaluate a Petition To Designate a Class of Employees for the General Electric...

    Science.gov (United States)

    2010-01-12

    ... Employees for the General Electric Company, Evendale, OH, To Be Included in the Special Exposure Cohort... evaluate a petition to designate a class of employees for the General Electric Company, Evendale, Ohio, to... Compensation Program Act of 2000. The initial proposed definition for the class being evaluated, subject to...

  16. Tool for the control management of electric and magnetic fields of electrical companies

    International Nuclear Information System (INIS)

    Arnera, Patricia; Barbieri, Beatriz

    2008-01-01

    The use of electricity involves a wide range of activities that, because of its diversity, characteristics and relative importance causes different environmental impacts during the extraction, processing, transport and consuming activities. It is the role of the government to elaborate the rules for the incorporation of environmental aspects in the different segments of the market for different electrical energy sources and in all the stages of the process, from the initial evaluation to the construction and exploitation phases. Among the environmental key aspects to considerate, are the electric and magnetic fields, in which society has taken special interest as they are believed to be involved in health hazard. The faculties of the regulatory authority are dictate regulations and technique procedures to be fulfilled by the agents, and check their compliance. In the course of time since the mentioned obligations, the authority has gathered information regarding electric and magnetic fields that includes those planned in the Companies Environmental Planning and those obtained ad-hoc in the role of controller. In order to systematize this information, a data base has been designed considering different types of electric installations, the company which they belong to, equipment used in the measurements, representative layouts with measure points and profiles of the electric and magnetic fields that were obtained. (author)

  17. Tool for the control management of electric and magnetic fields of electrical companies

    Energy Technology Data Exchange (ETDEWEB)

    Arnera, Patricia; Barbieri, Beatriz [La Plata Univ. Nacional (Argentina). Facultad de Ingenieria, Instituto de Investigaciones Tecnologicas para Redes y Equipos; Turco, Joaquin; Messina, Juan; Postiglioni, Osvaldo [Ente Nacional Regulador de la Electricidad, Buenos Aires (Argentina)

    2008-07-01

    The use of electricity involves a wide range of activities that, because of its diversity, characteristics and relative importance causes different environmental impacts during the extraction, processing, transport and consuming activities. It is the role of the government to elaborate the rules for the incorporation of environmental aspects in the different segments of the market for different electrical energy sources and in all the stages of the process, from the initial evaluation to the construction and exploitation phases. Among the environmental key aspects to considerate, are the electric and magnetic fields, in which society has taken special interest as they are believed to be involved in health hazard. The faculties of the regulatory authority are dictate regulations and technique procedures to be fulfilled by the agents, and check their compliance. In the course of time since the mentioned obligations, the authority has gathered information regarding electric and magnetic fields that includes those planned in the Companies Environmental Planning and those obtained ad-hoc in the role of controller. In order to systematize this information, a data base has been designed considering different types of electric installations, the company which they belong to, equipment used in the measurements, representative layouts with measure points and profiles of the electric and magnetic fields that were obtained. (author)

  18. Lost in transition? Comparing strategies of electricity companies in Delhi

    International Nuclear Information System (INIS)

    Criqui, Laure; Zérah, Marie-Hélène

    2015-01-01

    This paper examines the notion of energy transition when implemented by private utilities. In 2000, the Delhi government privatized electricity distribution to three private distribution companies. Most research was concerned with the impact of privatization on energy reliability, tariff settings and regulation issues. This paper looks at two under-researched themes: the expansion of services to poorer neighborhoods and the rollout of clean energy policies. This focus allows to unpack the materiality of socio-technical systems, to analyze how energy infrastructures are being technically deployed on the ground and to identify which social approach is used. To detail the specific practices of each company provides a more nuanced and accurate understanding of the reform. In-depth analysis of the three private utilities show that they interpret the reform mandate differently: they use a varied range of technical tools; they respond differently to social concerns in poorer neighborhoods; and they have distinctive internal management choices and corporate cultures. All these four factors can strengthen or undermine the transition towards increased access and clean energy. - Highlights: • Energy transition in an emerging cities aims at balancing environmental and social concerns. • Utilities have distinct transition paths despite similar privatization and regulation framework. • Utilities paths depend on spatial, social, managerial and corporate considerations. • Utilities' strategies are shaped by urban challenges rather than by energy policies

  19. A General Overview of Electric Road Vehicles

    International Nuclear Information System (INIS)

    Lamblin, Veronique

    2018-01-01

    In July 2017 Nicolas Hulot, the French Minister of Ecological and Inclusive Transition, presented a climate plan featuring an end to electricity generation from coal by 2022, a reduction in the nuclear component of electricity supply by one third, a total ban on the sale of petrol or diesel cars by 2040 and an incentive scheme designed gradually to remove polluting vehicles from the roads. Other European partners are following suit and promoting the spread of electric vehicles (Norway, Germany, Netherlands etc.). Yet is this the panacea that will meet the targets for greenhouse gas reduction in the battle against climate change? Futuribles examines the question in this issue with two articles: the first of these by Pierre Bonnaure, above, assesses the forces driving the spread of electric cars and the impediments to that process; this second article by Veronique Lamblin offers a general over - view of electric road vehicles (passenger cars, heavy good vehicles, bicycles etc.) throughout the world. (author)

  20. Data envelopment analysis with uncertain data: An application for Iranian electricity distribution companies

    International Nuclear Information System (INIS)

    Sadjadi, S.J.; Omrani, H.

    2008-01-01

    This paper presents Data Envelopment Analysis (DEA) model with uncertain data for performance assessment of electricity distribution companies. During the past two decades, DEA has been widely used for benchmarking the electricity distribution companies. However, there is no study among many existing DEA approaches where the uncertainty in data is allowed and, at the same time, the distribution of the random data is permitted to be unknown. The proposed method of this paper develops a new DEA method with the consideration of uncertainty on output parameters. The method is based on the adaptation of recently developed robust optimization approaches proposed by Ben-Tal and Nemirovski [2000. Robust solutions of linear programming problems contaminated with uncertain data. Mathematical Programming 88, 411-421] and Bertsimas et al. [2004. Robust linear optimization under general norms. Operations Research Letters 32, 510-516]. The results are compared with an existing parametric Stochastic Frontier Analysis (SFA) using data from 38 electricity distribution companies in Iran to show the effects of the data uncertainties on the performance of DEA outputs. The results indicate that the robust DEA approach can be a relatively more reliable method for efficiency estimating and ranking strategies

  1. Annual report 2000 of COPEL - Electrical Company of Parana State, Brazil

    International Nuclear Information System (INIS)

    2000-01-01

    The annual report of COPEL - Electrical Company of Parana State, Brazil, during the calendar year of 2003 is presented, comprising: a management report, portraying the Company's accomplishments during the year in connection with its core businesses and a social balance sheet, addressing the Company's efforts to contribute to the development and well-being of the community by means of socially oriented projects

  2. Evaluation of Public Service Electric & Gas Company`s standard offer program, Volume I

    Energy Technology Data Exchange (ETDEWEB)

    Goldman, C.A.; Kito, M.S.; Moezzi, M.M.

    1995-07-01

    In May 1993, Public Service Electric and Gas (PSE&G), the largest investor-owned utility in New Jersey, initiated the Standard Offer program, an innovative approach to acquiring demand-side management (DSM) resources. In this program, PSE&G offers longterm contracts with standard terms and conditions to project sponsors, either customers or third-party energy service companies (ESCOs), on a first-come, first-serve basis to fill a resource block. The design includes posted, time-differentiated prices which are paid for energy savings that will be verified over the contract term (5, 10, or 15 years) based on a statewide measurement and verification (M&V) protocol. The design of the Standard Offer differs significantly from DSM bidding programs in several respects. The eligibility requirements and posted prices allow ESCOs and other energy service providers to market and develop projects among customers with few constraints on acceptable end use efficiency technologies. In contrast, in DSM bidding, ESCOs typically submit bids without final commitments from customers and the utility selects a limited number of winning bidders who often agree to deliver a pre-specified mix of savings from various end uses in targeted markets. The major objectives of the LBNL evaluation were to assess market response and customer satisfaction; analyze program costs and cost-effectiveness; review and evaluate the utility`s administration and delivery of the program; examine the role of PSE&G`s energy services subsidiary (PSCRC) in the program and the effect of its involvement on the development of the energy services industry in New Jersey; and discuss the potential applicability of the Standard Offer concept given current trends in the electricity industry (i.e., increasing competition and the prospect of industry restructuring).

  3. 76 FR 35208 - Pacific Gas and Electric Company; Nevada Irrigation District; Notice of Environmental Site Review

    Science.gov (United States)

    2011-06-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Project No. 2310-193--California; Project No. 2266-102--California] Pacific Gas and Electric Company; Nevada Irrigation District; Notice of Environmental Site Review On July 6-8, 2011, the Federal Energy Regulatory Commission (Commission) staff and the Pacific Gas and Electric Company ...

  4. 77 FR 7211 - Pacific Gas and Electric Company, Diablo Canyon Independent Spent Fuel Storage Installation...

    Science.gov (United States)

    2012-02-10

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 72-26; NRC-2011-0110] Pacific Gas and Electric Company...) issued NRC Materials License No. SNM-2511 to the Pacific Gas and Electric Company (PG&E) for the Diablo.... 5. TS 3.1.2, ``Spent Fuel Storage Cask (SFSC) Heat Removal System,''--revise to allow the HI-STORM...

  5. 76 FR 44323 - National Grid Transmission Services Corporation; Bangor Hydro Electric Company; Notice of...

    Science.gov (United States)

    2011-07-25

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL11-49-000] National Grid Transmission Services Corporation; Bangor Hydro Electric Company; Notice of Petition for Declaratory Order Take..., 18 CFR 385.207, National Grid Transmission Services Corporation and Bangor Hydro Electric Company...

  6. 76 FR 36533 - Bangor Hydro Electric Company; Notice of Request for Waiver

    Science.gov (United States)

    2011-06-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. TS11-5-000] Bangor Hydro Electric Company; Notice of Request for Waiver Take notice that on June 13, 2011, pursuant to section 358.1(d) of the Commission's regulations, 18 CFR 358.1(d) (2011), Bangor Hydro Electric Company (Bangor...

  7. 75 FR 30021 - South Carolina Electric and Gas Company; Saluda Hydroelectric Project; Notice of Teleconference...

    Science.gov (United States)

    2010-05-28

    ... Electric and Gas Company; Saluda Hydroelectric Project; Notice of Teleconference With the National Marine... from Federal Energy Regulatory Commission (FERC) Headquarters, commencing at 2 p.m. (Eastern Standard... Project. The South Carolina Electric and Gas Company will also participate in the teleconference. All...

  8. A Bayesian stochastic frontier analysis of Chinese fossil-fuel electricity generation companies

    International Nuclear Information System (INIS)

    Chen, Zhongfei; Barros, Carlos Pestana; Borges, Maria Rosa

    2015-01-01

    This paper analyses the technical efficiency of Chinese fossil-fuel electricity generation companies from 1999 to 2011, using a Bayesian stochastic frontier model. The results reveal that efficiency varies among the fossil-fuel electricity generation companies that were analysed. We also focus on the factors of size, location, government ownership and mixed sources of electricity generation for the fossil-fuel electricity generation companies, and also examine their effects on the efficiency of these companies. Policy implications are derived. - Highlights: • We analyze the efficiency of 27 quoted Chinese fossil-fuel electricity generation companies during 1999–2011. • We adopt a Bayesian stochastic frontier model taking into consideration the identified heterogeneity. • With reform background in Chinese energy industry, we propose four hypotheses and check their influence on efficiency. • Big size, coastal location, government control and hydro energy sources all have increased costs

  9. Artificial Intelligence Research at General Electric

    OpenAIRE

    Sweet, Larry

    1985-01-01

    General Electric is engaged in a broad range of research and development activities in artificial intelligence, with the dual objectives of improving the productivity of its internal operations and of enhancing future products and services in its aerospace, industrial, aircraft engine, commercial, and service sectors. Many of the applications projected for AI within GE will require significant advances in the state of the art in advanced inference, formal logic, and architectures for real-tim...

  10. Shutdown risk management applied at Philadelphia Electric Company

    International Nuclear Information System (INIS)

    Dagan, William J.; True, Douglas E.; Wilson, Thomas; Truax, William

    2004-01-01

    The development and implementation of an effective risk management program requires basic risk or safety knowledge and the conversion of such information into effective management tools. ERIN Engineering and Research, Inc., under contract to the Electric Power Research Institute, has developed an effective program. Outage Risk Assessment and Management (ORAM), to provide plant and management personnel with understandable results of shutdown risk studies. With this tool, the impact of plans and decision options can be readily determined and displayed for the decision maker. This paper describes these methods and their application to the Limerick Nuclear Station of Philadelphia Electric Company. It also sets forth a broader application of these methods to include support of management decisions at-power and following forced outages. The result is an integrated risk management framework which can allow management and technical personnel to utilize readily available and understandable risk insights to optimize each activity. This paper addresses the resolution of several key issues in detail: How was the ORAM risk management method employed to represent the existing plant shutdown procedures and policies? How did the ORAM risk management method enhance the decision-making ability of the outage management staff? How was the ORAM software efficiently integrated with the outage scheduling software? How is quantitative risk information generated and used for outage planning and control? The ORAM risk management philosophy utilizes a series of colors to depict various risk configurations. Each such configuration has associated with it clear guidance. By modifying the conditions existing in the plant it is possible to impact the type of risk being encountered as well as the guidance which is appropriate for that period. In addition, the duration of a particular configuration can be effectively managed to reduce the overall risk impact. These are achieved with minimal

  11. Tampa Electric Company Polk Power Station IGCC project: Project status

    Energy Technology Data Exchange (ETDEWEB)

    McDaniel, J.E.; Carlson, M.R.; Hurd, R.; Pless, D.E.; Grant, M.D. [Tampa Electric Co., FL (United States)

    1997-12-31

    The Tampa Electric Company Polk Power Station is a nominal 250 MW (net) Integrated Gasification Combined Cycle (IGCC) power plant located to the southeast of Tampa, Florida in Polk County, Florida. This project is being partially funded under the Department of Energy`s Clean Coal Technology Program pursuant to a Round II award. The Polk Power Station uses oxygen-blown, entrained-flow IGCC technology licensed from Texaco Development Corporation to demonstrate significant reductions of SO{sub 2} and NO{sub x} emissions when compared to existing and future conventional coal-fired power plants. In addition, this project demonstrates the technical feasibility of commercial scale IGCC and Hot Gas Clean Up (HGCU) technology. The Polk Power Station achieved ``first fire`` of the gasification system on schedule in mid-July, 1996. Since that time, significant advances have occurred in the operation of the entire IGCC train. This paper addresses the operating experiences which occurred in the start-up and shakedown phase of the plant. Also, with the plant being declared in commercial operation as of September 30, 1996, the paper discusses the challenges encountered in the early phases of commercial operation. Finally, the future plans for improving the reliability and efficiency of the Unit in the first quarter of 1997 and beyond, as well as plans for future alternate fuel test burns, are detailed. The presentation features an up-to-the-minute update on actual performance parameters achieved by the Polk Power Station. These parameters include overall Unit capacity, heat rate, and availability. In addition, the current status of the start-up activities for the HGCU portion of the plant is discussed.

  12. 76 FR 69713 - Application To Export Electric Energy; BP Energy Company

    Science.gov (United States)

    2011-11-09

    ... DEPARTMENT OF ENERGY [OE Docket No. EA-314-A] Application To Export Electric Energy; BP Energy.... SUMMARY: BP Energy Company (BP Energy) has applied to renew its authority to transmit electric energy from... electric energy from the United States to Mexico as a power marketer for a five-year term using existing...

  13. 76 FR 69712 - Application To Export Electric Energy; BP Energy Company

    Science.gov (United States)

    2011-11-09

    ... DEPARTMENT OF ENERGY [OE Docket No. EA-315-A] Application To Export Electric Energy; BP Energy.... SUMMARY: BP Energy Company (BP Energy) has applied to renew its authority to transmit electric energy from... BP Energy to transmit electric energy from the United States to Canada as a power marketer for a five...

  14. 17 CFR 250.7 - Companies deemed not to be electric or gas utility companies.

    Science.gov (United States)

    2010-04-01

    ... status afforded by paragraph (b)(1) of this section, any such company shall file with this Commission a... a statement of receipts and expenditures for such year and of financial status at its end. (3) As a prerequisite to retaining the status afforded by paragraph (b)(1) of this section, any such company shall...

  15. Evaluation of the League General Insurance Company child safety seat distribution program

    Science.gov (United States)

    1982-05-01

    This report presents an evaluation of the child safety seat distribution initiated by the League General Insurance Company in June 1979. The program provides child safety seats as a benefit under the company's auto insurance policies to policy-holder...

  16. General Electric's training program for BWR chemists

    International Nuclear Information System (INIS)

    Osborn, R.N.; Lim, W.

    1981-01-01

    This paper describes the development and implementation of the General Electric boiling water reactor chemistry training program from 1959 to the present. The original intention of this program was to provide practical hands on type training in radiochemistry to BWR chemistry supervisors with fossil station experience. This emphasis on radiochemistry has not changed through the years, but the training has expanded to include the high purity water chemistry of the BWR and has been modified to include new commission requirements, engineering developments and advanced instrumentation. Student and instructor qualifications are discussed and a description of the spin off courses for chemistry technicians and refresher training is presented

  17. Design and performance of General Electric boiling water reactor main steam line isolation valves

    International Nuclear Information System (INIS)

    Rockwell, D.A.; van Zylstra, E.H.

    1976-08-01

    An extensive test program has been completed by the General Electric Company in cooperation with the Commonwealth Edison Company on the basic design type of large main steam line isolation valves used on General Electric Boiling Water Reactors. Based on a total of 40 tests under simulated accident conditions covering a wide range of mass flows, mixture qualities, and closing times, it was concluded that the commercially available valves of this basic type will close completely and reliably as required. Analytical methods to predict transient effects in the steam line and valve after postulated breaks were refined and confirmed by the test program

  18. Quality assurance system in electric power companies in Japan, (2)

    International Nuclear Information System (INIS)

    Hamaguchi, Shun-ichi

    1980-01-01

    The organization for the quality assurance in nuclear power plants of Kansai Electric Power Co., Inc. is introduced. It is still in investigation stage what quality assurance (QA) organization and system is the best. The QA investigation project team was organized in the form directly supervised by the Office of President. The purpose of QA in operation is to maintain the functions of power plants in good condition over the lifetime of the power plants after starting the operation, and the QA is divided into the following five items: (1) running operation, (2) check-up and maintenance, (3) in-service testing and inspection, (4) regular inspection, (5) general application control. The purposes and works to be implemented for these items are listed in a table, and explained in detail. The quality control in regular inspection is described about 4 stages is purchase order and contract, design, construction, and adjusting operation. Also further improvement of QA in operating nuclear power plants by implementing the next items has been decided to make the most of the teachings in the accident of Three Mile Island plant. (1) Reinforcement of operation management system, (2) completion of the training for operators, (3) clarification of the command system for operational control, and (4) change of installations and review of application. As seen in the above description, the important tasks in QA activities are the matching to the existing installations and the adjustment of interfaces with the equipments in operation. (Wakatsuki, Y.)

  19. L'Anse Warden Electric Company Boiler Number One Emission Test Report – March 2017

    Science.gov (United States)

    L’Anse Warden Electric Company (LWEC) submitted results from an emission test on the Boiler No. 1 stack. Stack air emission testing was conducted in March 2017, and the report became available in June 2017

  20. L'Anse Warden Electric Company Boiler Number One Emission Test Report – December 2016

    Science.gov (United States)

    L’Anse Warden Electric Company (LWEC) submitted results from an emission test on the Boiler No. 1 stack. Stack air emission testing was conducted in December 2016, and the report became available in January 2017

  1. L'Anse Warden Electric Company Boiler Number One Emission Test Report – July 2016

    Science.gov (United States)

    L’Anse Warden Electric Company (LWEC) submitted results from an emission test on the Boiler No. 1 stack. Stack air emission testing was conducted in July 2016, and the report became available in August 2016.

  2. L'Anse Warden Electric Company Boiler Number One Emission Test Report – June 2017

    Science.gov (United States)

    L’Anse Warden Electric Company (LWEC) submitted results from an emission test on the Boiler No. 1 stack. Stack air emission testing was conducted in March 2017, and the report became available in June 2017

  3. Design of investment management optimization system for power grid companies under new electricity reform

    Science.gov (United States)

    Yang, Chunhui; Su, Zhixiong; Wang, Xin; Liu, Yang; Qi, Yongwei

    2017-03-01

    The new normalization of the economic situation and the implementation of a new round of electric power system reform put forward higher requirements to the daily operation of power grid companies. As an important day-to-day operation of power grid companies, investment management is directly related to the promotion of the company's operating efficiency and management level. In this context, the establishment of power grid company investment management optimization system will help to improve the level of investment management and control the company, which is of great significance for power gird companies to adapt to market environment changing as soon as possible and meet the policy environment requirements. Therefore, the purpose of this paper is to construct the investment management optimization system of power grid companies, which includes investment management system, investment process control system, investment structure optimization system, and investment project evaluation system and investment management information platform support system.

  4. Do distribution companies loose money with an electricity flexible tariff?: A review of the Chilean case

    International Nuclear Information System (INIS)

    Vera, Sonia; Bernal, Felipe; Sauma, Enzo

    2013-01-01

    We can get an (energy efficiency) EE improvement if we produce a flatter daily load curve, leading to a higher efficiency of the power system, making better use of the generation and transport electricity chain, thus avoiding over-investment in equipment used just few hours a year. Tariff flexibility of the (Time of Use) TOU type is one of these measures. Generally, TOU systems are designed to minimize total system cost, which may cause losses in distribution companies (DISCOs), generating opposition. On the contrary, the present paper proposes a TOU system for electricity consumption in Chile where optimal prices are obtained in order to maximize total income of DISCOs. In this manner, the proposed TOU system is, by definition, beneficial for DISCOs and it may lead to a win–win situation among DISCOs and consumers. In particular, we show that such a system, implemented in a country like Chile, would allow for DISCOs a total potential benefit of 811.7 millions of dollars for the 3-year study period (2005–2007), considering initiatives that promote a 5% savings in real consumption during on-peak hours, obtained by the spread or difference between the proposed and the current systems. - Highlights: • We propose a TOU (Time of Use) system for electricity consumption in Chile. • In this system the optimal prices are obtained in order to maximize total income of (distribution companies) DISCOs. • The proposed TOU system may lead to a win–win situation among DISCOs and consumers. • This system, implemented in a country like Chile, would allow for DISCOs a total potential benefit of M$811.7. • Benefit obtained for 3-year study period with initiatives that promote 5% savings in real consumption during on-peak hours

  5. 77 FR 56241 - Notice of Withdrawal of Final Design Approval; Westinghouse Electric Company; Advanced Passive 1000

    Science.gov (United States)

    2012-09-12

    ... NUCLEAR REGULATORY COMMISSION [NRC-2010-0131] Notice of Withdrawal of Final Design Approval; Westinghouse Electric Company; Advanced Passive 1000 By letter dated December 10, 2010, Westinghouse Electric... final design approval (FDA) for the Advanced Passive 1000 (AP1000) design upon the completion of...

  6. Management report 2001 of COPEL - Electrical Company of Parana State, Brazil

    International Nuclear Information System (INIS)

    Anon

    2000-01-01

    The COPEL - Electrical Company of Parana State, Brazil - management report of calendar year of 2000 is presented, covering the following topics: COPEL - standing for much more than energy; extending the benefits of electricity to everyone in Parana state, Brazil; protecting and recovering the environment; philanthropy and volunteer work; education; social integration; support to cultural expression and gratitude

  7. Social balance sheet 2000 of COPEL - Electrical Company of Parana State, Brazil

    International Nuclear Information System (INIS)

    Anon

    2000-01-01

    The COPEL - Electrical Company of Parana State, Brazil social balance report of calendar year of 2000 is presented, covering the following topics: COPEL - standing for much more than energy; extending the benefits of electricity to everyone in Parana state, Brazil; protecting and recovering the environment; philanthropy and volunteer work; education; social integration; support to cultural expression and gratitude

  8. Measuring efficiency and productivity change (PTF) in the Peruvian electricity distribution companies after reforms

    Energy Technology Data Exchange (ETDEWEB)

    Perez-Reyes, Raul [Organismo Supervisor de la Inversion en Energia y Mineria, Osinergmin (Peru); Tovar, Beatriz [Infrastructure and Transport Research Group (EIT), Department of Applied Economics, University of Palmas de Gran Canaria (Spain)

    2009-06-15

    This paper analyzes the evolution of productivity of the electricity distribution companies in Peru, to assess whether reforms have improved the efficiency in this sector. The paper also identifies potential sources of productivity changes, based on market restructuring the electricity sector and changes in property. To do this, we rely on a set of data for 14 distribution companies, for the period 1996-2006. Our analysis suggests that improvements in the efficiency and productivity of electricity distribution in Peru have occurred, and that there is a relationship between the restructuring of distribution sector and the enhancement of productivity. (author)

  9. The financial and accounting implications of the privatization of the regional electricity companies in the UK

    International Nuclear Information System (INIS)

    Thomson, L.

    1993-01-01

    This paper reviews some of the financial and accounting implications of the privatization of the electricity distribution and supply sector in England and Wales, specifically the transformation of the Electricity Area Boards into the 12 Regional Electricity Companies (RECs). It considers the factors influencing the setting of post-privatization price control factors; the capital restructuring of the RECs; the valuation placed by the Secretary of State for Energy on each company at flotation, and market reaction to this as shown in subsequent changes in share price; and changes in the information provided in the RECs' accounts over the privatization period. (Author)

  10. Measuring efficiency and productivity change (PTF) in the Peruvian electricity distribution companies after reforms

    International Nuclear Information System (INIS)

    Perez-Reyes, Raul; Tovar, Beatriz

    2009-01-01

    This paper analyzes the evolution of productivity of the electricity distribution companies in Peru, to assess whether reforms have improved the efficiency in this sector. The paper also identifies potential sources of productivity changes, based on market restructuring the electricity sector and changes in property. To do this, we rely on a set of data for 14 distribution companies, for the period 1996-2006. Our analysis suggests that improvements in the efficiency and productivity of electricity distribution in Peru have occurred, and that there is a relationship between the restructuring of distribution sector and the enhancement of productivity. (author)

  11. 76 FR 67594 - Airworthiness Directives; General Electric Company Turboshaft Engines

    Science.gov (United States)

    2011-11-02

    ..., engine bay fire due to fuel leakage, and forced landing or accident. DATES: This AD is effective November... bay fire due to fuel leakage, and forced landing or accident. Relevant Service Information We reviewed... the fuel filter differential pressure switch. The average labor rate is $85 per work-hour. Required...

  12. Forecasted electric power demands for the Baltimore Gas and Electric Company. Volume 1 and Volume 2. Documentation manual

    International Nuclear Information System (INIS)

    Estomin, S.L.; Beach, J.E.; Goldsmith, J.V.

    1991-05-01

    The two-volume report presents the results of an econometric forecast of peak load and electric power demand for the Baltimore Gas and Electric Company (BG ampersand E) through the year 2009. Separate energy sales models were estimated for residential sales in Baltimore City, residential sales in the BG ampersand E service area excluding Baltimore City, commercial sales, industrial sales, streetlighting sales, and Company use plus losses. Econometric equations were also estimated for electric space heating and air conditioning saturation in Baltimore City and in the remainder of the BG ampersand E service territory. In addition to the energy sales models and the electric space conditioning saturation models, econometric models of summer and winter peak demand on the BG ampersand E system were estimated

  13. Competition and monopolies, exclusive rights for electricity companies

    International Nuclear Information System (INIS)

    Taccoen, L.

    1993-01-01

    The European Community has decided to liberalize the electric power industry within the community abolishing state monopolies, and allowing third party access. This policy was based on until then untested free-market theories. The advantage of state monopoly was that it could guarantee security of supply - vital with a non-storable commodity such as electricity. The advantages of TPA were said to be that it would lower prices, and that the market would ensure security of supply. The United Kingdom experimented in deregulation and end-user choice. In this experiment long-term planning has suffered, all new power stations are gas-fired because of low capital cost, and the effects on the British coal industry have been catastrophic. Thus, the effect of TPA seems to be a switch to natural gas, and an increase in prices to domestic consumers. Further research is needed, rather than a switch to TPA based on ideology alone

  14. Competition and monopolies, exclusive rights for electricity companies

    Energy Technology Data Exchange (ETDEWEB)

    Taccoen, L [Electricite de France (France)

    1993-01-01

    The European Community has decided to liberalize the electric power industry within the community abolishing state monopolies, and allowing third party access. This policy was based on until then untested free-market theories. The advantage of state monopoly was that it could guarantee security of supply - vital with a non-storable commodity such as electricity. The advantages of TPA were said to be that it would lower prices, and that the market would ensure security of supply. The United Kingdom experimented in deregulation and end-user choice. In this experiment long-term planning has suffered, all new power stations are gas-fired because of low capital cost, and the effects on the British coal industry have been catastrophic. Thus, the effect of TPA seems to be a switch to natural gas, and an increase in prices to domestic consumers. Further research is needed, rather than a switch to TPA based on ideology alone.

  15. Clean coal technology project to Polk Power Station, Tampa Electric Company, Florida, Volume 1: Report

    International Nuclear Information System (INIS)

    1994-06-01

    Tampa Electric Company proposes to construct and operate a 1,150-MW power station in southwestern Polk County, Florida. The proposed Polk Power Station would require an EPA NPDES permit for a new source and would include a 260-MW IGCC unit as a DOE Clean Coal Technology demonstration project. This EIS document assesses the proposed project and alternatives with respect to environmental impacts. Mitigative measures are also evaluated for the preferred alternative. Included in this Volume I are the following: alternatives including Tampa Electric Companies proposed project (preferred alternative with DOE financial assistance); affected environment; environmental consequences of the alternatives

  16. General conditions for electric power supply

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    If it is uncertain whether future power bills will be paid fully, it is admissible to take an action claiming a declaration which states that the electricity rate payment boycotter has no right to non-payment nor a right to withhold payment towards the electricity supply utility, and that the electricity supply utility has the right to stop energy supply because of reduced electricity rate payments effected and/or announced, and to denounce the contract without observing any term of notice. If the electricity buyer reduces a power bill to be paid without any legal grounds, the electricity supply utility has the right to stop power supplies and to denounce the power supply contract without observing any term of notice. The freedom of thought and the freedom of opinion must not be expressed by reducing power bills to be paid. Basic rights discontinue to be effective as soon as a contract or law is broken. A weighing of protected interests is not effected if the exercise of a basic law is unlawful. (orig./HP) [de

  17. Analysis of tariff levels from electric company in relation to financing request

    International Nuclear Information System (INIS)

    Correa, A.L.S.

    1991-11-01

    The economic-financial model of the Brazilian electric sector is discussed, considering the compatibility of the practiced tariff levels to the demand of consumption market and the production and operation costs. Some institutional actions are identified as solutions for emergency questions and subsides to the big strategies. The economic-finance indicators are also presented, showing the performance of the electrical companies. (C.G.C.)

  18. 76 FR 28023 - Duke Energy Carolinas, LLC, South Carolina Electric & Gas Company; Notice of Meetings

    Science.gov (United States)

    2011-05-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2232-522; Project No. 516-459] Duke Energy Carolinas, LLC, South Carolina Electric & Gas Company; Notice of Meetings On March 18, 2011, the National Marine Fisheries Service (NMFS) requested a meeting with Duke Energy Carolinas, LLC...

  19. 78 FR 56944 - Pacific Gas and Electric Company; Humboldt Bay Independent Spent Fuel Storage Installation

    Science.gov (United States)

    2013-09-16

    ... process waste at the Humboldt Bay ISFSI will not significantly affect the quality of the human environment... NUCLEAR REGULATORY COMMISSION [Docket No. 72-27; NRC-2011-0115] Pacific Gas and Electric Company; Humboldt Bay Independent Spent Fuel Storage Installation AGENCY: Nuclear Regulatory Commission. ACTION...

  20. 75 FR 8753 - Carolina Power & Light Company, Brunswick Steam Electric Plant, Units 1 and 2; Environmental...

    Science.gov (United States)

    2010-02-25

    ... Dusenbury of the North Carolina Department of Environment and Natural Resources regarding the environmental... & Light Company, Brunswick Steam Electric Plant, Units 1 and 2; Environmental Assessment and Finding of No... identification of licensing and regulatory actions requiring environmental assessments,'' the NRC prepared an...

  1. Training Needs Assessment of Technical Skills in Managers of Tehran Electricity Distribution Company

    Science.gov (United States)

    Koohi, Amir Hasan; Ghandali, Fatemeh; Dehghan, Hasan; Ghandali, Najme

    2016-01-01

    Current dissertation has been conducted in order to investigate and detect training needs of the mangers (top and middle) in Tehran Electricity Distribution Company. Research method is applied kind based on its purpose. Due to data collection method, this query is descriptive-survey type. Statistical population in this study is all of managers in…

  2. Tampa electric company - IGCC project. Quarterly report, January 1, 1996--March 31, 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    This quarterly report consists of materials presented at a recent review of the project. The project is an IGCC project being conducted by Tampa Electric Company. The report describes the status of the facility construction, components, operations staff training, and discusses aspects of the project which may impact the final scheduled completion.

  3. 77 FR 18883 - Surety Companies Acceptable on Federal Bonds-Termination and Merger; Pioneer General Insurance...

    Science.gov (United States)

    2012-03-28

    .... Department of the Treasury, Financial Management Service, Financial Accounting and Services Division, Surety... Carrico, Director, Financial Accounting and Services Division, Financial Management Service. [FR Doc. 2012...--Termination and Merger; Pioneer General Insurance Company AGENCY: Financial Management Service, Fiscal Service...

  4. LOGISTICS MANAGEMENT IN THE GENERAL STRUCTURE OF COMPANY MANAGEMENT

    OpenAIRE

    SERGIU PETROVICI; ALA GUDIMA

    2011-01-01

    The paper is dedicated to the place of logistics management in the general structure of an enterprise. It states some rules to improve the logistic system through development of logistic management as integral system and through a complex approach, development of a market-orientated logistic management with clear short-term and long-term purposes, development of information system in logistics. The course of Logistics Management is taught at the Cooperative-Commercial University of Moldova at...

  5. The diverse strategies of american electricity companies in the face of de-monopolization of the electricity market

    International Nuclear Information System (INIS)

    Finon, D.; Serrato, G.

    2000-01-01

    The electricity boards in the United States of America have adopted new strategies clearly influenced by anterior regulations and by de-monopolization. Numerous mergers are only the most spectacular of these strategies, enabling the start-up handicap of size in face of new competition to be surmounted, and offering the advantage of bringing together the supply of gas and electricity. Two principal means of adaptation for the gas and electricity boards are their development in non-regulated production (equipment sharing, setting up of merchant plants), and their involvement in bulk trade and competitive retail sales; moreover some choose to specialize in electronuclear production on transport. Lastly, internationalization and diversification towards telecommunications are more frequent there than elsewhere. The purpose of this article is to characterize these strategies in comparison with those of the European electricity companies

  6. Job safety and awareness analysis of safety implementation among electrical workers in airport service company

    Directory of Open Access Journals (Sweden)

    Putra Perdana Suteja

    2018-01-01

    Full Text Available Electrical is a fundamental process in the company that has high risk and responsibility especially in public service company such as an airport. Hence, the company that operates activities in the airport has to identify and control the safety activities of workers. On the safety implementation, the lack of workers’ awareness is fundamental aspects to the safety failure. Therefore, this study aimed to analyse the safety awareness and identify risk in the electrical workplace. Safety awareness questionnaires are distributed to ten workers in order to analyse their awareness. Job safety analysis method used to identify the risk in the electrical workplace. The preliminary study stated that workers were not aware of personal protective equipment usage so that the awareness and behavioural need to be analysed. The result is the hazard was found such as electrical shock and noise for various intensity in the workplace. While electrical workers were aware of safety implementation but less of safety behaviour. Furthermore, the recommendation can be implemented are the implementation of behaviour-based safety (BBS, 5S implementation and accident report list.

  7. Do acquisitions by electric utility companies create value? Evidence from deregulated markets

    International Nuclear Information System (INIS)

    Kishimoto, Jo; Goto, Mika; Inoue, Kotaro

    2017-01-01

    In the early 1990s, the United Kingdom (the UK) initiated widespread reforms in the electricity industry through a series of market liberalization policies. Several other countries have subsequently followed the lead and restructured their electricity industry. A major outcome of the deregulation effort is the spate of takeovers, both domestic and global, by electric utility companies. With the entry of new players and increasing competition, the business environment of the electricity industry has changed dramatically. This study analyzes the economic impact of mergers and acquisitions (M&As) in the electric utility industry after deregulation. We have examined acquisitions that took place between 1998 and 2013 in the United States, Canada, the UK, Germany, and France. Although previous studies showed no evidence of a positive effect on acquiring firms through M&As, we find that acquisitions by electric utility companies increased the acquiring firms’ share value and improved their operating performance, primarily through efficiency gains after the deregulation. These results are consistent with the empirical evidence and implications presented by Andrade et al. (2001) that M&A created value for the shareholders of the acquiring and target combined firms. - Highlights: • This study examined mergers and acquisitions (M&A) in electric utility industry. • The sample covered M&A between 1998 and 2013 in North America and Europe. • We found M&A significantly increased acquiring firms’ share value and operating performance. • Deregulation policy realized gains for shareholders without incurring costs for consumers.

  8. Advice presented on behalf of the commission of finances, economy and plan about the law project (no. 1613) relative to the electric and gas public utilities and to the power and gas companies; Avis presente au nom de la Commission des finances, de l'economie generale et du plan sur le projet de loi (no. 1613), relatif au service public de l'electricite et du gaz et aux entreprises electriques et gazieres

    Energy Technology Data Exchange (ETDEWEB)

    Carayon, B.

    2004-06-01

    The aim of this report is to present to the French deputies the advice of the commission of finances and economy about the law project relative to the change of status of the power and gas public utilities in the framework of the deregulation of European energy markets. This law changes the juridical status of the two state monopolies Electricite de France (EdF) and Gaz de France (GdF) into two anonymous companies and creates two additional companies for the management of the power and gas networks. It ensures also the transposition of the European directives from June 26, 2003 (2003/54/CE and 2003/55/CE). It contains some proper dispositions and modifies various existing French laws, in particular the law no. 46-628 from April 8, 1946 about the electricity and gas nationalization and the law no. 2000-108 from February 10, 2000 relative to the modernization and development of the electric public utility. The first part of the document reports on the general discussions and comments made by the commission about the law project while the second part concerns the detailed analysis of the articles 16 and 22 about the pension funds of EdF and GdF agents and the change of the status of both utilities. The amendments adopted by the commission for these articles conclude the report. (J.S.)

  9. Robust DEA under discrete uncertain data: a case study of Iranian electricity distribution companies

    Science.gov (United States)

    Hafezalkotob, Ashkan; Haji-Sami, Elham; Omrani, Hashem

    2015-06-01

    Crisp input and output data are fundamentally indispensable in traditional data envelopment analysis (DEA). However, the real-world problems often deal with imprecise or ambiguous data. In this paper, we propose a novel robust data envelopment model (RDEA) to investigate the efficiencies of decision-making units (DMU) when there are discrete uncertain input and output data. The method is based upon the discrete robust optimization approaches proposed by Mulvey et al. (1995) that utilizes probable scenarios to capture the effect of ambiguous data in the case study. Our primary concern in this research is evaluating electricity distribution companies under uncertainty about input/output data. To illustrate the ability of proposed model, a numerical example of 38 Iranian electricity distribution companies is investigated. There are a large amount ambiguous data about these companies. Some electricity distribution companies may not report clear and real statistics to the government. Thus, it is needed to utilize a prominent approach to deal with this uncertainty. The results reveal that the RDEA model is suitable and reliable for target setting based on decision makers (DM's) preferences when there are uncertain input/output data.

  10. Physical characteristics of GE [General Electric] BWR [boiling-water reactor] fuel assemblies

    International Nuclear Information System (INIS)

    Moore, R.S.; Notz, K.J.

    1989-06-01

    The physical characteristics of fuel assemblies manufactured by the General Electric Company for boiling-water reactors are classified and described. The classification into assembly types is based on the GE reactor product line, the Characteristics Data Base (CDB) assembly class, and the GE fuel design. Thirty production assembly types are identified. Detailed physical data are presented for each assembly type in an appendix. Descriptions of special (nonstandard) fuels are also reported. 52 refs., 1 fig., 6 tabs

  11. Development of a record retention and retrieval system for the Baltimore Gas and Electric Company

    International Nuclear Information System (INIS)

    Hoffman, H.L.

    1976-01-01

    The records associated with the design and construction of a nuclear power plant have increased in both volume and complexity. Baltimore Gas and Electric Company chose to retain and make available these records by using microfilm and a computer-generated index system. The technique of filming, data assembly, and controlled distribution of this material to various locations within the Company was developed and implemented. The index system has been designed to locate information and to provide a basis for searches of the data base for special information

  12. Setting up charging electric stations within residential communities in current China: Gaming of government agencies and property management companies

    International Nuclear Information System (INIS)

    Wu, Tian; Ma, Lin; Mao, Zhonggen; Ou, Xunmin

    2015-01-01

    The difficulty of charging electric vehicles (EVs) is now hindering their further development. Governments generally choose to build stations for home charging (including piles) within residential communities. Given the conflict of interest between various government agencies and property management companies, constructing a charging station within residential communities would result in welfare loss for the property management companies and therefore lead to the principal–agent problem. This paper constructs a two-period imperfect information game theory model to study the moral hazard involved in this issue and government agencies' optimal choice. In the analytic solution of the model, we find that the optimal choice for a farsighted government agency is to constantly improve the incentive mechanism and introduce charging stations only when the conflict of interest is eliminated. Any benefits derived from government regulations by force would prove short-lived. The government should focus on long-term returns in the development of EVs, and its optimal mechanism should be designed to mitigate the principal–agent problem of property management companies, thereby accelerate the progress of EV charging infrastructure and improve overall social welfare. - Highlights: • The charging of electric vehicles (EVs) is hindering their use. • A game theory model is used for analysis of EV charging station construction. • Charging stations are in residential communities in China. • Government agencies are constantly improving incentive mechanisms

  13. Analysis of Financial Ratio to Distinguish Indonesia Joint Venture General Insurance Company Performance using Discriminant Analysis

    Directory of Open Access Journals (Sweden)

    Subiakto Soekarno

    2012-01-01

    Full Text Available Insurance industry stands as a service business that plays a significant role in Indonesiaeconomical condition. The development of insurance industry in Indonesia, both of generalinsurance and life insurance, has increased very fast. The general insurance industry itselfdivided into two major players which are local private company and Joint Venture Company.Lately, the use of statistical techniques and financial ratios models to asses financial institutionsuch as insurance company have been used as one of the appropriate combination inpredicting the performance of an industry. This research aims to distinguish between JointVenture General Insurance Companies that have a good performance and those who are lessperforming well using Discriminant Analysis. Further, the findings led that DiscriminantAnalysis is able to distinguish Joint Venture General Insurance Companies that have a goodperformance and those who are not performing well. There are also six ratios which are RBC,Technical Reserve to Investment Ratio, Debt Ratio, Return on Equity, Loss Ratio, and ExpenseRatio that stand as the most influential ratios to distinguish the performance of joint venturegeneral insurance companies. In addition, the result suggest business people to be concernedtoward those six ratios, to increase their companies’ performance.Key words: general insurance, financial ratio, discriminant analysis

  14. Local electric dipole moments: A generalized approach.

    Science.gov (United States)

    Groß, Lynn; Herrmann, Carmen

    2016-09-30

    We present an approach for calculating local electric dipole moments for fragments of molecular or supramolecular systems. This is important for understanding chemical gating and solvent effects in nanoelectronics, atomic force microscopy, and intensities in infrared spectroscopy. Owing to the nonzero partial charge of most fragments, "naively" defined local dipole moments are origin-dependent. Inspired by previous work based on Bader's atoms-in-molecules (AIM) partitioning, we derive a definition of fragment dipole moments which achieves origin-independence by relying on internal reference points. Instead of bond critical points (BCPs) as in existing approaches, we use as few reference points as possible, which are located between the fragment and the remainder(s) of the system and may be chosen based on chemical intuition. This allows our approach to be used with AIM implementations that circumvent the calculation of critical points for reasons of computational efficiency, for cases where no BCPs are found due to large interfragment distances, and with local partitioning schemes other than AIM which do not provide BCPs. It is applicable to both covalently and noncovalently bound systems. © 2016 Wiley Periodicals, Inc. © 2016 Wiley Periodicals, Inc.

  15. General Electric : Immelt surve all / Jena McGregor

    Index Scriptorium Estoniae

    McGregor, Jena

    2008-01-01

    Ettevõtte General Electric juht Jeffrey R. Immelt võitleb selle nimel, et taastada usaldus firma vastu, kuna laenukriis ja kehvad aktsiahinnad on tekitanud olukorra, kus investorid avaldavad suurt survet ettevõtte juhile. Lisa: GE kindralid

  16. General Electric tõrjus Microsofti liidrikohalt / Kaja Koovit

    Index Scriptorium Estoniae

    Koovit, Kaja, 1968-

    2001-01-01

    General Electric võttis Microsofti ees liidrikoha maailma suurima turuväärtusega ettevõtte edetabelis FT500. Tabelid: Maailma suurima turukapitalisatsiooniga ettevõtete TOP25, Skandinaavia firmade turuväärtuse TOP10

  17. Electricity company managers' views of environmental issues: Implications for environmental groups and government

    International Nuclear Information System (INIS)

    Fischhoff, Maya E.

    2007-01-01

    The electricity industry's environmental impacts are a matter of acute interest to many outsiders, including government and environmental groups-and they have sought to affect those impacts through regulations, public pressure, and technical assistance. These approaches reflect outsiders' intuitive theories regarding the industry's goals, practices, and capabilities. The research reported here provides a systematic insiders' view on these processes, based on in-depth interviews with 70 middle managers in two electricity companies heavily reliant on coal. It finds managers sincerely committed to environmental action, but often frustrated by confusing regulatory requirements, perceived costs, and other challenges. It identifies ways of enabling middle managers to act on their commitment, with lessons relevant for outside groups and those within companies seeking to effect change

  18. Assessment and Improving Methods of Reliability Indices in Bakhtar Regional Electricity Company

    Directory of Open Access Journals (Sweden)

    Saeed Shahrezaei

    2013-04-01

    Full Text Available Reliability of a system is the ability of a system to do prospected duties in future and the probability of desirable operation for doing predetermined duties. Power system elements failures data are the main data of reliability assessment in the network. Determining antiseptic parameters is the goal of reliability assessment by using system history data. These parameters help to recognize week points of the system. In other words, the goal of reliability assessment is operation improving and decreasing of the failures and power outages. This paper is developed to assess reliability indices of Bakhtar Regional Electricity Company up to 1393 and the improving methods and their effects on the reliability indices in this network. DIgSILENT Power Factory software is employed for simulation. Simulation results show the positive effect of improving methods in reliability indices of Bakhtar Regional Electricity Company.

  19. Centralized vs. decentralized thermal IR inspection policy: experience from a major Brazilian electric power company

    Science.gov (United States)

    dos Santos, Laerte; da Costa Bortoni, Edson; Barbosa, Luiz C.; Araujo, Reyler A.

    2005-03-01

    Furnas Centrais Elétricas S.A is one of the greatest companies of the Brazilian electric power sector and a pioneer in using infrared thermography. In the early 70s, the maintenance policy used was a centralized approach, with only one inspection team to cover all the company"s facilities. In the early 90s, FURNAS decided to decentralize the thermography inspections creating several inspection teams. This new maintenance policy presented several advantages when compared to the previous one. However the credibility of the results obtained with the thermal inspection was frequently being questioned, in part due to the lack of a detailed planning to carry out the transition from the centralized inspection to the decentralized one. In some areas of the company it was suggested the inactivation of the thermography. This paper presents the experience of FURNAS with these different maintenance policies and details the procedures which have been taken that nowadays the infrared thermal inspection has become one of the most important techniques of predictive maintenance in the company.

  20. 75 FR 77666 - General Motors Company, Formerly Known as General Motors Corporation, Technical Center, Including...

    Science.gov (United States)

    2010-12-13

    ...., Global Technology Associates Limited, G-Tech Professional Staffing, Inc., Jefferson Wells, Kelly Services... Enterprise Services, Engineering Labs, Inc., Global Technology Associates Limited, G-Tech Professional... company reports that workers leased from Modern Engineering/ Professional Services were employed on-site...

  1. R&D+ i Strategic Management in a Public Company in the Brazilian Electric Sector

    Directory of Open Access Journals (Sweden)

    Ruy De Quadros Carvalho

    2013-05-01

    Full Text Available The purpose of this paper is - by reporting an experience of structuring processes and tools related to the strategic management of R&D in the electricity sector – to show the conditions and potential for improved efficiency, efficacy, and effectiveness in the R&D program set by ANEEL. The methodology is action research. This is because the proposed and tested model is the result of reflection and resolution of critical organizational issues, applied in a public company in the electric power sector. Act No. 9,991 of July 24, 2000 provides for the obligation on the part of concessionaires, permittees, and licensees in the electric power sector to invest part of their operating revenue in research and development (R&D. For the effective implementation of these legal obligations, companies prepare their annual R&D programs, comprising projects that aim at developing innovative solutions for their processes and increasing business efficiency. However, the urgency to comply with the contractual provisions, coupled with the small amount of experience most companies have when it comes to carrying out R&D activities and projects, has led to the gradual formation of a mode of R&D implementation and management that does not favor its optimization and alignment with the goals the utility companies and the sector’s own technological development . The approach proposed in this paper consists of structuring the processes and tools related to the management of R&D driven by innovation (R&D+i and aligned with with the business strategy. These processes include the adoption of procedures and tools to manage structured, integrated decision-making flows involved in the innovation process, aiming at full alignment with business goals and objectives.

  2. The effect of electric transmission constraints on how power generation companies bid in the Colombian electrical power market

    Directory of Open Access Journals (Sweden)

    Luis Eduardo Gallego Vega

    2010-05-01

    Full Text Available This paper presents the results of research about the effect of transmission constraints on both expected electrical energy to be dispatched and power generation companies’ bidding strategies in the Colombian electrical power market. The proposed model simulates the national transmission grid and economic dispatch by means of optimal power flows. The proposed methodology allows structural problems in the power market to be analyzed due to the exclusive effect of trans- mission constraints and the mixed effect of bidding strategies and transmission networks. A new set of variables is proposed for quantifying the impact of each generation company on system operating costs and the change in expected dispatched energy. A correlation analysis of these new variables is presented, revealing some interesting linearities in some generation companies’ bidding patterns.

  3. 75 FR 11918 - General Electric Kentucky Glass Plant, Lighting, LLC, Including On-Site Leased Workers From the...

    Science.gov (United States)

    2010-03-12

    ... DEPARTMENT OF LABOR Employment and Training Administration [TA-W-72,011] General Electric Kentucky Glass Plant, Lighting, LLC, Including On-Site Leased Workers From the Patty Tipton Company, Aetna Building Maintenance, and Concentra, Lexington, KY; Amended Certification Regarding Eligibility To Apply for Worker Adjustment Assistance In accordanc...

  4. Green marketing in the Massachusetts electric company retail competition pilot program

    Energy Technology Data Exchange (ETDEWEB)

    Rothstein, S.M.; Fang, J.M.

    1997-10-01

    With electric industry restructuring initiatives being introduced on the state and federal levels, retail access pilot programs serve an important function for examining competitive market issues, as well as marketing strategies and customer reactions to different power supply options. The experience gained through these pilots provides important insights into future power market operations, including the market for green power. The Massachusetts Electric Company`s (MECo`s) Choice: New England pilot for residential and small-business customers was a voluntary program developed primarily to test the billing and metering logistics that distribution companies will need in the competitive market. The pilot also offered a preview of program implementation and marketing under customer choice. It was the first retail competition pilot to explicitly include green power options in program design. The MECo pilot`s energy suppliers were selected through the issuance of a request for proposals (RFP). Respondents were asked to submit bids in one or more of three energy supply categories-price, green, and other options. These options were developed by the pilot administrator through internal meetings, discussions with state officials and other stakeholders, and a review of information from other similar pilots. For the green option, the pilot administrator did not establish a green standard. Instead, suppliers were allowed to submit offers that promoted environmental stewardship. Customer response to the different green options are reported. The pilot results clearly demonstrate that, in a competitive situation, there is interest in a variety of energy supply options, including green options. 2 tabs.

  5. Environmental Disclosure of Electric Power Companies Listed in the Corporate Sustainability Index (CSI

    Directory of Open Access Journals (Sweden)

    Clésia Ana Gubiani

    2012-12-01

    Full Text Available The study aimed to verify the level of disclosure of environmental information in the administration reports of the energy companies listed in the Corporate Sustainability Index (CSI. A descriptive and quantitative research was done, using the content analysis technique on the administration reports from 2006 to 2008. The sample consisted of 11 electric power companies listed in the CSI. For quantitative analysis of the disclosure index, the data collection instrument was based on the study of Rover, Murcia and Borba (2008, which proposes eight environmental categories and 36 subcategories. For the whole analysis of the data were elaborated networks of the items disclosed in each company, using the software UNICET ®. The survey results showed that there is satisfactory disclosure in the categories of environmental policies and education, training and research environment. However, it was found that there is need for greater disclosure of categories of products impacts and processes in the environment, power polices and financial environmental information. It was concluded that the information disclosed in the administration reports of the companies surveyed about the environmental information do not respect the principle of full disclosure.

  6. 76 FR 10403 - General Motors Company, Pontiac Assembly; Pontiac, MI; Notice of Negative Determination on...

    Science.gov (United States)

    2011-02-24

    ... Agricultural Implement Workers of America (UAW) stated that production of standard cab and extended cab GMC... DEPARTMENT OF LABOR Employment and Training Administration [TA-W-72,554] General Motors Company... October 25, 2010 (75 FR 65513). Workers at GM-Pontiac are engaged in employment related to the production...

  7. Handling of Environmental Related Requirements : Awareness and Ability to Act at Small and Medium Sized Electric and Electronic Companies

    OpenAIRE

    Lin, Han-Hsuan

    2008-01-01

    Environmental related product requirements are increasing worldwide from government authorities, customers and other stakeholders. For small and medium sized companies manufacturing electric and electronic products it is more difficult compared to bigger companies to meet new product related requirements due to smaller budget, resources and knowledge. This research studies the awareness and ability to act upon changes when small and medium sized companies in Sweden face environmental related ...

  8. USING THE GENERAL ELECTRIC / MCKINSEY MATRIX IN THE PROCESS OF SELECTING THE CENTRAL AND EAST EUROPEAN MARKETS

    Directory of Open Access Journals (Sweden)

    Nicolae Răzvan Decuseară

    2013-01-01

    Full Text Available Due to limited resources a company cannot serve all potential markets in the world in a manner that all the clients to be satisfied and the business goals achieved, which is why the company should select the most appropriate markets. It can focus on a single product market serving many geographic areas, but may also decide to serve different product markets in a group of selected geographic areas. Due to the large number and diversity of markets that can choose, analyze of the market attractiveness and the selection the most interesting is a complex process. General Electric Matrix/McKinsey has two dimensions, market attractiveness and the competitive strength of the firm, and aims to analyze the strengths and weaknesses of the company in a variety of areas, allowing the company to identify the most attractive markets and to guide managers in allocating resources to these markets, improve the weaker competitive position of the company in emerging markets, or to draw firm unattractive markets. We can say that it is a very efficient tool for the company being used by international market specialists, on one hand to select foreign markets for the company, and on the other hand, to determine the strategy that the firm will be using to internationalize on those markets. At the end of this paper we present a part of a larger study in which we showed how General Electric Matrix/McKinsey it is used specifically in select foreign markets.

  9. 76 FR 66333 - Carolina Power & Light Company, H.B. Robinson Steam Electric Plant, Unit No. 2; Environmental...

    Science.gov (United States)

    2011-10-26

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-261; NRC-2011-0247] Carolina Power & Light Company, H.B. Robinson Steam Electric Plant, Unit No. 2; Environmental Assessment and Finding of No Significant... Facility Operating License No. DPR-23, issued to Carolina Power & Light Company (the licensee), for...

  10. Did a local distribution company procure prudently during the California electricity crisis?

    International Nuclear Information System (INIS)

    Woo, C.-K.; Lloyd, Debra; Clayton, William

    2006-01-01

    To manage cost risk, prudent procurement of electric power requires that some portion of a buyer's energy demand be met through long-term contracting. Under cost-of-service regulation or performance-based regulation, a local distribution company (LDC) should be allowed to fully recover all prudently incurred power procurement costs. However, the regulatory test of prudence is an ex post review with the threat of disallowance. This paper presents an economic analysis of procurement prudence involving a small LDC, Bear Valley Electric Service (BVES), which serves a resort area in Southern California. The key findings are: (a) high and volatile prices and rolling blackouts characterized the market environment faced by the owner of BVES, Southern California Water Company (SCWC), at its signing of a 5-year fixed price contract; (b) SCWC was a price-taker with no incentive to act imprudently; (c) the contract was obtained via a competitive bidding process; (d) the contract price was comparable to the benchmark price of contemporaneous contracts; (e) the fixed price contract was economic when compared to available alternatives; and (f) despite (a)-(e), a negotiated settlement with the state regulator and a large user resulted in substantial disallowance. The policy implication is that a regulator should approve a prudent procurement plan proposed by an LDC to remove the unreasonable risk of an ex post review. If the LDC strictly adheres to the plan, the resulting electricity purchases are per se prudent and should entitle the LDC to full cost recovery

  11. The French Electricity Company (EDF) and the environment. Press file for 1996

    International Nuclear Information System (INIS)

    Bourdier, Jean-Pierre

    1997-01-01

    In 1996 the actions of EDF in the domain of environment have recorded FF 4 billions (FF 3.5 billion in 1995), representing about 2% of the EDF's turnover. The EDF keeps on its efforts for reducing the impact of its activities upon environment. Several applications of an environment protective electricity generation are promoted by the company. The company brings services and technical solutions to its clients which meet their energy needs and conserving at the same time the life conditions. Furthermore, EDF participates in the activity of numerous national and international organisms, intervening in the environmental questions, in decision making, participating in studies and actions and following continually the direction of a durable economic and social development. The report is structured in three chapters: 1. an industrial responsibility; 2. services and techniques for environment; 3. action towards a durable development

  12. Plan 2000. The electricity companies plan for electricity conservation in the millennium; Plan 2000. Elselskabernes plan for elbesparelser i det nye aartusinde

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-12-01

    Plan 2000 presents an account of the activities in the years 1997 and 1998 and a budget for the year 2000 and forwards. The report includes all 82 electricity companies in Denmark. Furthermore a number of particular analyses of relevance to electricity conservation are presented. All electricity companies work to promote electricity conservation. All consumption sizes and sections are covered. The activities in the individual companies are supported by a number of common campaigns. In Plan 2000 those activities are presented and the economics is analysed. The activities in the first year of the plan are expected to result in conservation corresponding 4% of the present electricity consumption. 80% of the conservation comes from activities, which are measurable. Technical counselling of trade customers is one of the essential activities. Others are e.g. telephone counselling, theme arrangements and teaching of pupils. (EHS)

  13. The adaptation of the electric power companies to the power market

    International Nuclear Information System (INIS)

    Otterstad, B.; Ottosen, R.

    1993-02-01

    This report describes the challenges met by the Norwegian electric power companies in adapting to a more market oriented business and their possibilities and strategies when facing the uncertainties on the market side. The main principles of adaptation to the market are described and various strategies are illustrated by means of simple calculations and figures. The theoretical basis for analyses of adaptation to the market and for pricing period contracts and options are discussed. The report concludes with a discussion of the de-regulation of the North American gas market and draws parallels to the Norwegian power market. 17 figs

  14. How the largest electric and gas utility companies administer public relations

    Energy Technology Data Exchange (ETDEWEB)

    Bogart, J.D.

    1979-04-12

    This article describes the findings of a survey conducted by the author in the second half of 1978 to determine the sizes of the public relations staffs of the nation's largest operating electric and gas utilities, their budgets, organizational differences, and specific functions. Common public relations issues and major public relations problems of the utilities are identified, as well as recent trends or changes in budgeting and organization. Some functional variations of public relations departments among utility companies were detected and described.

  15. Development on power distribution technologies of four electric power companies in Japan. The Tokyo Electric Power Co. , Inc

    Energy Technology Data Exchange (ETDEWEB)

    1989-07-01

    Electric power companies have been needed to cope with various needs in accordance with the progress of highly information-oriented society, the improvement of industrial technology, and the advancement and diversification of the living environment. In such situation, the power distribution section of Tokyo Electric Power has promoted technical development, setting up following priority items to put into operation: to reduce power failure caused by works and accidents, to improve reliability in supply, to reduce costs of construction and all over business management, to serve customers to answer various needs, to develop new technology and new methods based on the medium- and long-term prospect, and so forth. Several examples of recent technical development are introduced here. They are as follows; compact equipment and materials for electric poles to match the circumstances of cities and to simplify the construction method for power distribution, a 750kVA large high-voltage power-generation truck to make provision against an emergency such as a disaster by a typhoon, a compact transformer used on the ground, a high-voltage automatic cabinet, and a detector to find the failure of indoor power distribution works in resistances in a short time. 8 figs.

  16. Impact of Contingent Liabilities Reclassification on Financial Performance: An Analysis with Brazilian Companies of Electricity Utilities Sector

    Directory of Open Access Journals (Sweden)

    Carlos Henrique Silva do Carmo

    2018-01-01

    Full Text Available The main objective of this research is to verify the effect of a reconfiguration of contingent liabilities in the financial performance of Brazilian companies in the electricity sector in the years 2013 to 2015. The sample consisted of 53 companies and 153 financial statements were analyzed. The model used to reconfigure the contingent liabilities into provisions was developed by Rose (2014. The author classifies the reversal in 5 scenarios: Optimistic (20% Partially Optimistic (40%, moderate (60% Partially Pessimistic (80% and Pessimistic (100%. To represent the economic and financial performance we selected three indicators: General Liquidity (LG, General Indebtedness (EG and Return Over Assets (ROA. The results showed that for worst-case scenarios, there is a significant difference between the indicators calculated on the original data in comparison with those calculated within the reclassified scenarios. The Statistics D of Cohen (1988 pointed out that, in addition to statistically significant, in the worst scenarios, the size effect was also too high, especially for the ROA and the Indebtedness. For Liquidity the differences were not so significant. The findings of this research serve as a warning to users of financial statements and pointed out that they should be aware of the financial effect of different interpretations of the individuals involved in decisions about the likelihood of loss in provision and Contingent liabilities.

  17. Development of management systems for nuclear power plant of Hokuriku Electric Power Company

    International Nuclear Information System (INIS)

    Nakamura, Tatsuaki; Hasunuma, Junichi; Suzuki, Shintaro

    2009-01-01

    Hokuriku Electric Power Company has been operating the Shika Nuclear Power Station that it constructed in Shika city, Ishikawa prefecture, for over 15 years since bringing Unit 1 of this plant online in July 1993. In addition to electricity generation, maintenance and inspection tasks constitute a big part of operating a large-scale nuclear power plant, and in recent years, problems at power stations in the nuclear power industry have led to several revisions of nationally regulated maintenance and inspection systems. This paper describes the background, objectives, development method, and features of the Maintenance Management System and Maintenance History Management System that make effective use of information technology to promote safer and more efficient maintenance work at large-scale nuclear power plants. (author)

  18. Managing electricity procurement cost and risk by a local distribution company

    International Nuclear Information System (INIS)

    Chikeung Woo; Karimov, R.I.; Horowitz, I.

    2004-01-01

    A local electricity distribution company (LDC) can satisfy some of its future electricity requirements through self-generation and volatile spot markets, and the remainder through fixed-price forward contracts that will reduce its exposure to the inherent risk of spot-price volatility. A theoretical framework is developed for determining the forward-contract purchase that minimizes the LDCs expected procurement cost, subject to a cost-exposure constraint. The answers to the questions of ''What to buy?'' and ''How to buy?'' are illustrated using an example of a hypothetical LDC that is based on a municipal utility in Florida. It is shown that the LDCs procurement decision is consistent with least-cost procurement subject to a cost-exposure constraint, and that an internet-based multi-round auction can produce competitive price quotes for its desired forward purchase. (author)

  19. Managing electricity procurement cost and risk by a local distribution company

    International Nuclear Information System (INIS)

    Woo, C.-K.; Karimov, R.I.; Horowitz, Ira

    2004-01-01

    A local electricity distribution company (LDC) can satisfy some of its future electricity requirements through self-generation and volatile spot markets, and the remainder through fixed-price forward contracts that will reduce its exposure to the inherent risk of spot-price volatility. A theoretical framework is developed for determining the forward-contract purchase that minimizes the LDCs expected procurement cost, subject to a cost-exposure constraint. The answers to the questions of 'What to buy?' and 'How to buy?' are illustrated using an example of a hypothetical LDC that is based on a municipal utility in Florida. It is shown that the LDCs procurement decision is consistent with least-cost procurement subject to a cost-exposure constraint, and that an internet-based multi-round auction can produce competitive price quotes for its desired forward purchase

  20. 75 FR 82414 - Carolina Power & Light Company; H. B. Robinson Steam Electric Plant, Unit No. 2; Exemption

    Science.gov (United States)

    2010-12-30

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-261; NRC-2010-0062] Carolina Power & Light Company; H. B. Robinson Steam Electric Plant, Unit No. 2; Exemption 1.0 Background Carolina Power & Light... authorizes operation of the H.B. Robinson Steam Electric Plant, Unit 2 (HBRSEP). The license provides, among...

  1. 75 FR 11579 - Carolina Power & Light Company H. B. Robinson Steam Electric Plant, Unit No. 2; Exemption

    Science.gov (United States)

    2010-03-11

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-261; NRC-2010-0062] Carolina Power & Light Company H. B. Robinson Steam Electric Plant, Unit No. 2; Exemption 1.0 Background Carolina Power & Light... of the H. B. Robinson Steam Electric Plant, Unit 2 (HBRSEP). The license provides, among other things...

  2. Investment Cost Model in Business Process Intelligence in Banking And Electricity Company

    Directory of Open Access Journals (Sweden)

    Arta Moro Sundjaja

    2016-06-01

    Full Text Available Higher demand from the top management in measuring business process performance causes the incremental implementation of BPM and BI in the enterprise. The problem faced by top managements is how to integrate their data from all system used to support the business and process the data become information that able to support the decision-making processes. Our literature review elaborates several implementations of BPI on companies in Australia and Germany, challenges faced by organizations in developing BPI solution in their organizations and some cost model to calculate the investment of BPI solutions. This paper shows the success in BPI application of banks and assurance companies in German and electricity work in Australia aims to give a vision about the importance of BPI application. Many challenges in BPI application of companies in German and Australia, BPI solution, and data warehouse design development have been discussed to add insight in future BPI development. And the last is an explanation about how to analyze cost associated with BPI solution investment.

  3. Successful diversification strategies of electricity companies: An explorative empirical study on the success of different diversification strategies of German electricity companies in the wake of the European market liberalization

    International Nuclear Information System (INIS)

    Mueller, Ralf; Steinert, Martin; Teufel, Stephanie

    2008-01-01

    Based on the EC directive 96/92, the liberalization of electricity markets is forcing electricity companies, to rethink their product and market strategy. However, neither the level of the initiated diversification efforts of former monopolies, nor their direction or their success are known or have been analyzed before. Therefore, Mueller [2006. Diversifikationsstrategien von Stromversorgungsunternehmen: Handlungsempfehlungen fuer schweizerische Stromversorgungsunternehmen auf der Basis einer empirischen Analyse des liberalisierten deutschen Strommarktes. IIMT University Press, Fribourg] has quantitatively determined the extent and direction of the diversification efforts in the electricity sector. Additionally, based on an exploratory case study research, successful diversification strategies have been identified and incorporated into 73 observations which form the basis of a set of normative recommendations for diversifying electricity companies. Since the analyses are based on the German electricity market, which fully liberalized earlier than most of its continental European counterparts, the results may especially guide other European electricity companies in their strategic diversification decisions. This paper publishes both the quantitative analysis on the degree and extents of diversification (sample time frame 1995-2000) as well as the qualitative analysis on the success of diversification strategies (sample time frame 1995-2003). Additionally, based on the obtained explorative observations, the diversification strategy of an idealized-electricity company is firstly presented for practitioners as normative recommendation, and secondly for academics, as starting point for future quantitative analysis framework. (author)

  4. The Stickiness of Selling, General, and Administrative Costs in the Indonesian Companies

    Directory of Open Access Journals (Sweden)

    Benny Armanto

    2014-04-01

    Full Text Available Selling, general and administration costs are the main components in the Income Statement. A large number of permanent staff in sales and marketing department will make the company dominated by the fixed costs. This fact could lead to sticky cost behavior. In addition, role of the manager can also cause the cost stickiness. When the company’s revenue decreases, manager may delay to decrease the cost or not even decrease cost at all. The objective of the study is to determine whether cost stickiness of selling, general and administrative in the Indonesian listed companies. This study applied log-linear data panel regression with 3605 firm years that is listed in Indonesian Stock Exchange (BEI from 1993 – 2013. This study finds that selling, general, and administrative costs are sticky only for the manufacturing companies. Furthermore, the results show that adjustment of sales, general, and administrative costs delayed by the manager when revenue decreases, yet the cost stickiness will be reduced in the next period.

  5. [Tampa Electric Company IGCC project]. 1996 DOE annual technical report, January--December 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    Tampa Electric Company`s Polk Power Station Unit 1 (PPS-1) Integrated Gasification Combined Cycle (IGCC) demonstration project uses a Texaco pressurized, oxygen-blown, entrained-flow coal gasifier to convert approximately 2,000 tons per day of coal to syngas. The gasification plant is coupled with a combined cycle power block to produce a net 250 MW electrical power output. Coal is slurried in water, combined with 95% pure oxygen from an air separation unit, and sent to the gasifier to produce a high temperature, high pressure, medium-Btu syngas with a heat content of about 250 BTUs/cf (HHV). The syngas then flows through a high temperature heat recovery unit which cools the syngas prior to its entering the cleanup systems. Molten coal ash flows from the bottom of the high temperature heat recovery unit into a water-filled quench chamber where it solidifies into a marketable slag by-product. Approximately 10% of the raw, hot syngas at 900 F is designed to pass through an intermittently moving bed of metal-oxide sorbent which removes sulfur-bearing compounds from the syngas. PPS-1 will be the first unit in the world to demonstrate this advanced metal oxide hot gas desulfurization technology on a commercial unit. The emphasis during 1996 centered around start-up activities.

  6. 75 FR 54388 - General Motors Company Formerly Known as General Motors Corporation, Orion Assembly Plant...

    Science.gov (United States)

    2010-09-07

    ... Formerly Known as General Motors Corporation, Orion Assembly Plant Including On-Site Leased Workers From Aerotek Automotive Lake Orion, MI; Amended Certification Regarding Eligibility To Apply for Worker... Motors Corporation, Orion Assembly Plant, Lake Orion, Michigan. The notice was published in the Federal...

  7. Spatial generalized linear mixed models of electric power outages due to hurricanes and ice storms

    International Nuclear Information System (INIS)

    Liu Haibin; Davidson, Rachel A.; Apanasovich, Tatiyana V.

    2008-01-01

    This paper presents new statistical models that predict the number of hurricane- and ice storm-related electric power outages likely to occur in each 3 kmx3 km grid cell in a region. The models are based on a large database of recent outages experienced by three major East Coast power companies in six hurricanes and eight ice storms. A spatial generalized linear mixed modeling (GLMM) approach was used in which spatial correlation is incorporated through random effects. Models were fitted using a composite likelihood approach and the covariance matrix was estimated empirically. A simulation study was conducted to test the model estimation procedure, and model training, validation, and testing were done to select the best models and assess their predictive power. The final hurricane model includes number of protective devices, maximum gust wind speed, hurricane indicator, and company indicator covariates. The final ice storm model includes number of protective devices, ice thickness, and ice storm indicator covariates. The models should be useful for power companies as they plan for future storms. The statistical modeling approach offers a new way to assess the reliability of electric power and other infrastructure systems in extreme events

  8. General induction at companies - between an administrative process and a sociological phenomenon

    Directory of Open Access Journals (Sweden)

    Héctor L. Bermúdez Restrepo

    2012-12-01

    Full Text Available From the example of the process of general induction into the organization and using certain sociological resources, shows paradox are specialists in human management: is to carefor the motivation and the welfare of workers to achieve its high performance, their fidelity and his tenure at the company; However, current mutations of the social architecture in general and of work in particular –as structure of organized action– force thinking that organizational loyalty tends to be increasingly unlikely and that, conversely, the current personnel administration processes appear made inappropriate notions and appear to contribute directly to the adversities of human beings in organizational settings.

  9. Comprehensive Technical Report, General Electric Direct-Air-Cycle Aircraft Nuclear Propulsion Program, Program Summary and References

    Energy Technology Data Exchange (ETDEWEB)

    Thornton, G.; Rothstein, A.J.

    1962-06-28

    This is one of twenty-one volumes sumarizing the Aircraft Nuclear Propulsion Program of the General Electric Company. This volume discusses the background to the General Electric program, and summarizes the various direct-air-cycle nuclear test assemblies and power plants that were developed. Because of the requirements of high performance, low weight, and small size, vast improvements in existing technology were required to meet the flight objectives. The technological progress achieved during the program is also summarized. The last appendix contains a compilation of the abstracts, tables of contents, and reference lists of the other twenty volumes.

  10. POSSIBILITIES OF APPLYING THE DEA METHOD IN THE ASSESSMENT OF EFFICIENCY OF COMPANIES IN THE ELECTRIC POWER INDUSTRY: REVIEW OF WIND ENERGY COMPANIES

    Directory of Open Access Journals (Sweden)

    Dario Maradin

    2014-07-01

    Full Text Available One of the fundamental tasks of modern power system is finding ways to produce stable and continuous electricity from scarce energy resources. One of the possible solutions is introduction, implementation and improvement of alternative forms of energy such as renewable energy sources, particularly wind energy as an increasingly important energy source which is expected to further increase its share in total electricity production. Numerous methods can be used in assessing the efficiency of wind energy companies, and in the focus of this research is the Data Envelopment Analysis method (DEA, a widely accepted methodology given its interdisciplinary approach and flexibility. This method represents a step forward in the field of renewable energy management, because it provides the possibility to compare the selected companies with the best in the industry (the most efficient and the possibility of determining sources of inefficiency and, consequently, the possibilities of their elimination.

  11. Radwaste volume reduction and solidification by General Electric

    International Nuclear Information System (INIS)

    Green, T.A.; Weech, M.E.; Miller, G.P.; Eberle, J.W.

    1982-01-01

    Since 1978 General Electric has been actively engaged in developing a volume reduction and solidifcation system or treatment of radwaste generated in commercial nuclear power plants. The studies have been aimed at defining an integrated system that would be directly responsive to the rapid evolving needs of the industry for the volume reduction and solidification of low-level radwaste. The resulting General Electric Volume Reduction System (GEVRS) is an integrated system based on two processes: the first uses azeotropic distillation technology and is called AZTECH, and the second is controlled-air incineration...called INCA. The AZTECH process serves to remove water from concentrated salt solutions, ion exchange resins and filter sludge slurries and then encapsulates the dried solids into a dense plastic product. The INCA unit serves to reduce combustible wastes to ashes suitable for encapsulation into the same plastic product produced by AZTECH

  12. Standard technical specifications for General Electric boiling water reactors

    International Nuclear Information System (INIS)

    1979-08-01

    This Standard Technical Specification (STS) has been structured for the broadest possible use on General Electric plants currently being reviewed for an Operating License. Optional specifications are provided for those features and systems which may be included in individual plant designs but are not generic in their scope of application. This revision of the GE-STS does not typically include requirements which may be added or revised as a result of the NRC staff's further review of the Three Mile Island incident

  13. Measures taken by electric power companies for the accident at JCO

    International Nuclear Information System (INIS)

    Taniguchi, Kazufumi

    2000-01-01

    Activities for the JCO accident were done by 700 electric company personnel/day at the maximum, who were mainly the experts of radiation management and were from the whole Japanese regions. The major activities were as follows. Monitoring of body surface contamination of people at the refuge, which was done on request from Tokaimura, showed no radioactive contamination over detection limit. Activities based on the request from the national counter-planning headquarters involved environmental monitoring, which only showed the higher ambient dose rate than usual at the boundary of JCO site. Monitoring of toy equipments in kindergartens and primary and junior schools showed no contamination over detection limit. Measurement of dose equivalent of the personnel showed 0.0 mSv exposure by γ-, β-ray and neutron. In summary, questions and requests raised by people mainly concerned the influence of radiation exposure. (K.H.)

  14. Westinghouse Electric Company experiences in chemistry on-line monitoring in Eastern European nuclear power plants

    International Nuclear Information System (INIS)

    Balavage, J.

    2001-01-01

    Westinghouse Electric Company has provided a number of Chemistry On-Line Monitoring (OLM) Systems to Nuclear Power Plants in Eastern Europe. Eleven systems were provided to the Temelin Nuclear Power Plant in the south of the Czech Republic. Four systems were provided to the Russian NPP at Novovoronezh. In addition, a system design was developed for primary side chemistry monitoring for units 5 and 6 of another eastern European VVER. The status of the Temelin OLM systems is discussed including updates to the Temelin designs, and the other Eastern European installations and designs are also described briefly. Some of the problems encountered and lessons learned from these projects are also discussed. (R.P.)

  15. Efficiency and productivity (TFP) of the Turkish electricity distribution companies: An application of two-stage (DEA and Tobit) analysis

    International Nuclear Information System (INIS)

    Çelen, Aydın

    2013-01-01

    In this study, we analyze the efficiency performances of 21 Turkish electricity distribution companies during the period of 2002–2009. For this aim, we employ a two-stage analysis in order to take into account the business environment variables which are beyond the control of distribution companies. We determine the efficiency performances of the electricity distribution companies by help of DEA in the first stage. Then, in the second stage, using these calculated efficiency scores as dependent variable, we utilize Tobit model to determine the business environment variables which may explain the efficiency scores. According to the results, customer density of the region and the private ownership affect the efficiencies positively. Thus, the best strategy to improve efficiency in the market is privatizing the public distribution companies. - Highlights: • We analyze the efficiencies of 21 Turkish electricity distribution companies. • A two-stage analysis is employed to take into account environmental variables. • We firstly calculate efficiencies of companies with DEA, then Tobit model is used to determine the effects of the variables. • Customer density and ownership type affect the efficiencies positively. • Privatization is a good strategy to improve efficiencies

  16. Cost structure analysis of commercial nuclear power plants in Japan based on corporate financial statements of electric utility companies

    International Nuclear Information System (INIS)

    Kunitake, Norifumi; Nagano, Koji; Suzuki, Tatsujiro

    1998-01-01

    In this paper, we analyze past and current cost structure of commercial nuclear power plants in Japan based on annual corporate financial statements published by the Japanese electric utility companies, instead of employing the conventional methodology of evaluating the generation cost for a newly constructed model plant. The result of our study on existing commercial nuclear plants reveals the increasing significance of O and M and fuel cycle costs in total generation cost. Thus, it is suggested that electric power companies should take more efforts to reduce these costs in order to maintain the competitiveness of nuclear power in Japan. (author)

  17. Operation and maintenance experience at the General Atomic Company's TRIGA reactor facility at San Diego, California

    International Nuclear Information System (INIS)

    Whittemore, W.L.; Stout, W.A.; Shoptaugh, J.R.; Chesworth, R.H.

    1982-01-01

    Since the startup of the original 250 kW TRIGA Mark I reactor in 1958, General Atomic Company has accumulated nearly 24 years of operation and maintenance experience with this type of reactor. In addition to the nearly 24 years of experience gained on the Mark I, GA has operated the 1.5 MW Advanced Prototype Test Reactor (Mark F) for 22 years and operated a 2 MW below-ground TRIGA Mark III for five years. Information obtained from normal and abnormal operation are presented. (author)

  18. Report of the Economy, Sustainable Development and Land Planning Commission aiming at authorizing electricity final user and small companies to go back to the electricity regulated price

    International Nuclear Information System (INIS)

    2010-01-01

    This report first presents the French regulated price system by recalling the legal bases for electricity and natural gas pricing, and by describing the progressive process of the electricity and natural gas market opening in France. It outlines that a reversibility principle has been introduced along with regulated pricing in most of the European Union countries. It also comments the complexity created on this issue by successive laws in France, the consequences of the soon coming law on the new organization of the electricity market. Then, the report comments the proposition which aims at authorizing electricity household users and small companies to go back to the regulated electricity price, thereby perpetuating the reversibility principle, while maintaining a criterion of installed electricity power, including natural gas prices and new consumption sites. A table proposes a comparison between existing texts, the present law project and this Commission proposition

  19. Measuring efficiency and productivity change in power electric generation management companies by using data envelopment analysis: A case study

    International Nuclear Information System (INIS)

    Fallahi, Alireza; Ebrahimi, Reza; Ghaderi, S.F.

    2011-01-01

    This paper provides an empirical analysis of the determinants of energy efficiency in 32 power electric generation management companies over the period 2005–2009. The study uses non-parametric Data Envelopment Analysis (DEA) to estimate the relative technical efficiency and productivity change of these companies. In order to verify the stability of our DEA model and the importance of each input variable, a stability test is also conducted. The results of the study indicate that average technical efficiency of companies decreased during the study period. Nearly half of the companies (14) are below this average level of 88.7% for five years. Moreover, it is shown that the low increase of productivity changes is more related to low efficiency rather than technology changes. -- Highlights: ► DEA was applied on the 32 power electric generation management companies. ► A stability test is applied to verify the stability of DEA model. ► Average technical efficiency of companies decreased during the study period. ► The low increase of productivity changes is more related to low efficiency changes.

  20. Relative Pricing of Publicly Traded U.S. Electric Utility Companies

    Science.gov (United States)

    Jewczyn, Nicholas Stephen

    In the financial turmoil of 2008, U.S. firms reported debt-ratios that differed from the debt-ratios calculated from balance sheets. The problem is that investors bought common stock expecting initial investment return and lost money when companies delisted. The purpose of this quantitative study was to determine sample securities pricing with the application of synthetic assets and debt accrued. Addressed in the research questions was whether those securities were (a) underpriced compared with return-on-assets (ROA), (b) overpriced compared with ROA, (c) a debt-ratio higher than 60% and also overpriced, (d) underpriced with a synthetic asset added, or (e) related by relative pricing to variant pricing and market capitalization. The study's base theory was Pan's efficient market hypothesis (EMH) of security price prediction of market prices versus model prices. The data from the financial statements of 16 publicly traded U.S. electric utility companies were analyzed via correlations and multiple regression analyses to determine securities pricing and suitability. The findings from the analyses of the sample's variables of market price, book value, market-to-book, and study constructed variables from those variable data were statistically significant. The alternate hypotheses were accepted for all 5 research questions since the analytical operationalization of the hypothetical constructs led to significant relationships. Results suggest that the use of more pricing determinants in securities evaluation may lead to investors losing less money and earning the expected returns for a more efficient capital market, leading to a stronger economy and macroeconomic stability.

  1. 75 FR 26743 - Pacific Gas and Electric Company; Notice of Environmental Site Review and Technical Meetings To...

    Science.gov (United States)

    2010-05-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12779-005] Pacific Gas and Electric Company; Notice of Environmental Site Review and Technical Meetings To Discuss Information and Monitoring Needs for a License Application for a Pilot Project May 5, 2010. a. Type of Application: Draft Pilot License Application. b. Project N...

  2. 76 FR 388 - Southern Nuclear Operating Company; Vogtle Electric Generating Plant, Unit Nos. 1 and 2; Notice...

    Science.gov (United States)

    2011-01-04

    ... Operating Company; Vogtle Electric Generating Plant, Unit Nos. 1 and 2; Notice of Consideration of Issuance... Web site http://www.regulations.gov . Because your comments will not be edited to remove any... will not edit their comments to remove any identifying or contact information, and therefore, they...

  3. 76 FR 30206 - Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant, Unit 1 and 2; Notice...

    Science.gov (United States)

    2011-05-24

    ... Operating Company, Inc., Vogtle Electric Generating Plant, Unit 1 and 2; Notice of Consideration of Issuance..., http://www.regulations.gov . Because your comments will not be edited to remove any identifying or... received from other persons for submission to the NRC inform those persons that the NRC will not edit their...

  4. Institutional Governance Framework for Determining Carbon-related Accounting Practices: An Exploratory Study of Electricity Generating Companies in Malaysia

    Science.gov (United States)

    Alrazi, B.; Mat Husin, N.

    2016-03-01

    Electricity industry is the major contributor of the global carbon emissions which has been scientifically identified as the main cause of climate change. With the various initiatives being implemented at the international, national, and industry levels, companies in the electricity industry are currently facing immense pressure from various stakeholders to demonstrate their policies, initiatives, targets, and performance on climate change. Against this background, accounting system is argued to be able to be play important roles in combating climate change. Using institutional governance as the underlying framework, we have identified several governance mechanisms as the determining factors for companies to have a systematic accounting system related to carbon emissions. The factors include environmental management system certification, environmental organization, publication of stand-alone sustainability reports, the use of GRI guidelines, environmental strategic planning, governance quality, and participation in CDP surveys and emissions trading scheme. We explored this issue in the context of major electricity generating companies in Malaysia and found that except for certified environmental management system, the other governance mechanisms are still lacking. The findings suggest that companies in Malaysia, in particular, from the electricity industry are not well prepared in facing risks related to climate change.

  5. 75 FR 75704 - Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 And 2); Notice of...

    Science.gov (United States)

    2010-12-06

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-275-LR; 50-323-LR] Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 And 2); Notice of Appointment of Adjudicatory Employee... Seismologist, Office of Nuclear Material Safety and Safeguards, has been appointed as a Commission adjudicatory...

  6. 76 FR 76153 - Allco Renewable Energy Limited v. Massachusetts Electric Company d/b/a National Grid; Notice of...

    Science.gov (United States)

    2011-12-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL12-12-000] Allco Renewable Energy Limited v. Massachusetts Electric Company d/b/a National Grid; Notice of Complaint Take notice... Public Utilities Regulatory Policies Act (PURPA), Allco Renewable Energy Limited filed a formal complaint...

  7. 78 FR 32384 - South Carolina Electric and Gas Company; Notice Denying Motion to Intervene and Rejecting Request...

    Science.gov (United States)

    2013-05-30

    ... Commission staff's order. \\1\\ South Carolina Elec. and Gas Co., 143 FERC ] 62,041 (2013). Rule 214(b)(2) of... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 516-476] South Carolina... 22, 2013, Commission staff issued an order approving South Carolina Electric and Gas Company's...

  8. 13 CFR 108.1830 - NMVC Company's Capital Impairment definition and general requirements.

    Science.gov (United States)

    2010-01-01

    ... ADMINISTRATION NEW MARKETS VENTURE CAPITAL (âNMVCâ) PROGRAM NMVC Company's Noncompliance With Terms of Leverage Computation of Nmvc Company's Capital Impairment § 108.1830 NMVC Company's Capital Impairment definition and... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false NMVC Company's Capital Impairment...

  9. 78 FR 77114 - Pacific Gas and Electric Company: Notice of Application Accepted for Filing, Soliciting Comments...

    Science.gov (United States)

    2013-12-20

    ... Company (licensee). e. Name of Projects: Potter Valley Project. f. Location: Eel River and East Fork... Company, Mail Code: N11C P.O. Box 770000 San Francisco, CA 94177. Phone (415) 973-3076. i. FERC Contact...

  10. Development, assessment, licensing, and application of RELAP5YA at Yankee Atomic Electric Company

    International Nuclear Information System (INIS)

    Husain, A.

    1984-01-01

    Since 1975, Yankee Atomic Electric Company (YAEC) has been licensed to perform LOCA analyses (large and small breaks) for PWRs. The methods are based upon the WREM package, comprised of RELAP4-MOD 3, RELAP4-FLOOD, and TOODEE-2EM. Significant efforts were expended to compare WREM models against Appendix K criteria, and to incorporate changes for compliance with the criteria and for improved representation of LOCA phenomena. /SUP 2,3,4/ This internalized capability has been used extensively for licensing the Yankee and Maine Yankee plants, and for timely resolution of LOCA issues which frequently arose. The value of this internalized analysis capability was well recognized by the Yankee management. In 1979, Yankee embarked upon another LOCA Methods Development Program. One objective was to remove extra conservatisms inherent in older codes to provide additional operational flexibility for our plants. Also, we needed a code which could be used in a production mode to provide realistic response for off-normal conditions to be used in operator training and emergency guideline assessment. This program resulted in the development of RELAP5YA. The development, assessment, licensing, and application of RELAP5YA at YAEC is briefly described in this paper

  11. Creating a business environment in inventory management - The Philadelphia Electric Company experiences

    International Nuclear Information System (INIS)

    Franks, A.J.; Birch, H.

    1992-01-01

    Philadelphia Electric Company's (PECo's) Nuclear Engineering and Services Department was asked to develop a (non-fuel) inventory management philosophy that will optimize inventory dollars at Peach Bottom atomic power station and Limerick generating station. The ultimate goal of the project is to maximize the potential for the correct parts being available at the lowest possible level of investment. There are many factors that make the management of maintenance, repair, and operating (MRO) supply inventories more complicated than managing finished goods, work-in-progress, or raw materials. Determining correct inventory levels for nuclear power plants is complicated by the irregular demand for spare parts and the cyclic nature of demand caused by refueling outages. Based on the information collected, it was determined that PECo's nuclear group needed to develop policies and strategies to address the following issues: (1) inventory classification based on part criticality, usage, and demand forecast; (2) item level ordering policies based on classification system; (3) inventory performance management; and (4) management of obsolete/surplus parts. Currently, policies are being developed to manage surplus and obsolete materials. Opportunities are being explored regarding the potential capitalization of critical components and parts. The policies established for classification, ordering policies, and performance management are being translated into work processes via common procedures and guidelines

  12. 76 FR 54259 - Virginia Electric and Power Company, Docket Nos. 50-338 and 50-339, North Anna Power Station...

    Science.gov (United States)

    2011-08-31

    ... NUCLEAR REGULATORY COMMISSION [NRC-2011-0185] Virginia Electric and Power Company, Docket Nos. 50.... NPF-4 and NPF-7, issued to Virginia Electric Power Company (the licensee), for operation of the North...) and (d) during declarations of severe weather conditions involving tropical storm or hurricane force...

  13. 76 FR 77022 - In the Matter of Carolina Power & Light Company, H.B. Robinson Steam Electric Plant, Unit No. 2...

    Science.gov (United States)

    2011-12-09

    ... and 72-3] In the Matter of Carolina Power & Light Company, H.B. Robinson Steam Electric Plant, Unit No. 2, H. B. Robinson Steam Electric Plant, Unit 2, Independent Spent Fuel Storage Installation; Order Approving Indirect Transfer of Control of Licenses I. Carolina Power & Light Company (CP&L, the licensee) is...

  14. Implementation of the General Data Protection Regulation in companies in the Republic of Croatia

    Directory of Open Access Journals (Sweden)

    Krešimir Starčević

    2018-01-01

    Full Text Available This paper deals with the current issue of protecting individuals regarding the processing of their personal data and the free movement of such data. As this matter is also regulated by the European Union legislation, the paper describes and analyzes the scope, implications, methods and tools for applying the new EU regulation adopted on 27 April 2016 by the Parliament and the Council of the European Union. The subject matter is the Regulation (EU 2016/679 on the protection of natural persons with regard to the processing of personal data and on the free movement of such data. The short title of this Regulation is General Data Protection Regulation (GDPR. The term GDPR is thus in common everyday use in companies and among business people, and will also be used in this paper. In addition, the paper analyzes the research conducted on the existing state of affairs and the way in which all collected personal data are processed and used by all stakeholders in the company Atlantic Grupa d.d., Zagreb. In addition, a harmonized project of a structured and methodologically correct procedure for implementation of the provisions of the new Regulation is described for the purpose of achieving the highest degree of compliance of all members of Atlantic Grupa d.d. with the provisions of the GDPR. Finally, the basic objective of the described project is explained, which is to avoid situations that would lead to the extremely high fines for non-compliance with the Regulation.

  15. Simulation of Hawaiian Electric Companies Feeder Operations with Advanced Inverters and Analysis of Annual Photovoltaic Energy Curtailment

    Energy Technology Data Exchange (ETDEWEB)

    Giraldez Miner, Julieta I [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Nagarajan, Adarsh [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Gotseff, Peter [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Krishnan, Venkat K [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Hoke, Anderson F [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Ueda, Reid [Hawaiian Electric Company; Shindo, Jon [Hawaiian Electric Company; Asano, Marc [Hawaiian Electric Company; Ifuku, Earle [Hawaiian Electric Company

    2017-07-26

    The Hawaiian Electric Companies achieved a consolidated Renewable Portfolio Standard (RPS) of approximately 26% at the end of 2016. This significant RPS performance was achieved using various renewable energy sources - biomass, geothermal, solar photovoltaic (PV) systems, hydro, wind, and biofuels - and customer-sited, grid-connected technologies (primarily private rooftop solar PV systems). The Hawaiian Electric Companies are preparing grid-modernization plans for the island grids. The plans outline specific near-term actions to accelerate the achievement of Hawai'i's 100% RPS by 2045. A key element of the Companies' grid-modernization strategy is to utilize new technologies - including storage and PV systems with grid-supportive inverters - that will help to more than triple the amount of private rooftop solar PV systems. The Hawaiian Electric Companies collaborated with the Smart Inverter Technical Working Group Hawai'i (SITWG) to partner with the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) to research the implementation of advanced inverter grid support functions (GSF). Together with the technical guidance from the Companies's planning engineers and stakeholder input from the SITWG members, NREL proposed a scope of work that explored different modes of voltage-regulation GSF to better understand the trade-offs of the grid benefits and curtailment impacts from the activation of selected advanced inverter grid support functions. The simulation results presented in this report examine the effectiveness in regulating voltage as well as the impact to the utility and the customers of various inverter-based grid support functions on two Hawaiian Electric distribution substations.

  16. 17 CFR 210.6-03 - Special rules of general application to registered investment companies.

    Science.gov (United States)

    2010-04-01

    ... regulated investment company as defined in subtitle A, chapter 1, subchapter M of the Internal Revenue Code... case of a person which in essence is comprised of more than one separate investment company, be given...

  17. Project of law modified by the Senate relative to the electric and gas public utilities and to the electric and gas companies

    International Nuclear Information System (INIS)

    2004-07-01

    This project of law aims to adapt the electricity and gas sector to the new economical context of opening of the energy markets to competition. It gives to energy companies the internal organization base necessary to warrant a high level of service and a transparent and non-discriminatory access of third parties to transport and distribution networks. These evolutions will allow Electricite de France (EdF) and Gaz de France (GdF) companies to compete on equal terms with their European competitors. It confirms first the prime role of public utility of both companies and then transposes the dispositions of the European directives relative to the organization of EdF and GdF integrated companies. It foresees the creation of two daughter companies for the management of energy transport activities. The project of law foresees also the change of the status of EdF and GdF companies and the reform of the retirement pensions of the personnel. This report presents the modifications added by the Senate to the text of law adopted at first reading by the House of Commons. (J.S.)

  18. Standard Technical Specifications, General Electric plants, BWR/4

    International Nuclear Information System (INIS)

    1992-09-01

    This NUREG contains improved Standard Technical Specifications (STS) for General Electric Plants, BWR/4, and documents the positions of the Nuclear Regulatory Commission based on the BWR Owners Group's proposed STS. This document is the result of extensive technical meetings and discussions among the NRC staff, the Nuclear Steam Supply System (NSSS) Owners Groups, the NSSS vendors, and the Nuclear Management and Resources Council (NUMARC). The improved STS were developed based on the criteria in the interim Commission Policy Statement on Technical Specification Improvements for Nuclear Power Reactors, dated February 6, 1987. The improved STS will be used as the basis for individual nuclear power specifications. This report contains three volumes. This document, Volume 2, contains the Bases for Chapters 2.0 and 3.0, and Sections 3.1--3.3 of the improved STS

  19. 76 FR 16477 - General Reporting and Recordkeeping by Savings Associations and Savings and Loan Holding Companies

    Science.gov (United States)

    2011-03-23

    ... Savings Associations and Savings and Loan Holding Companies AGENCY: Office of Thrift Supervision (OTS...), 12 CFR 562.4 (audit of savings association, savings and loan holding company, or affiliate), 12 CFR... the savings association), 12 CFR 584.1(f) (books and records of each savings and loan holding company...

  20. 76 FR 31680 - General Reporting and Recordkeeping by Savings Associations and Savings and Loan Holding Companies

    Science.gov (United States)

    2011-06-01

    ... Savings Associations and Savings and Loan Holding Companies AGENCY: Office of Thrift Supervision (OTS... Savings and Loan Holding Companies. OMB Number: 1550-0011. Form Number: N/A. Description: This information...), 12 CFR 562.4 (audit of savings association, savings and loan holding company, or affiliate), 12 CFR...

  1. Service hall in Number 1 Fukushima Nuclear Power Station, Tokyo Electric Power Company, Inc

    International Nuclear Information System (INIS)

    Tawara, Shigesuke

    1979-01-01

    There are six BWR type nuclear power plants in the Number 1 Fukushima Nuclear Power Station, Tokyo Electric Power Company, Inc. The service hall of the station is located near the entrance of the station. In the center of this service hall, there is the model of a nuclear reactor of full scale. This mock-up shows the core region in the reactor pressure vessel for the number one plant. The diameter and the thickness of the pressure vessel are about 5 m and 16 cm, respectively. The fuel assemblies and control rods are set just like the actual reactor, and the start-up operation of the reactor is shown colorfully and dynamically by pushing a button. When the control rods are pulled out, the boiling of water is demonstrated. The 1/50 scale model of the sixth plant with the power generating capacity of 1100 MWe is set, and this model is linked to the mock-up of reactor written above. The operations of a recirculating loop, a turbine and a condenser are shown by switching on and off lamps. The other exhibitions are shielding concrete wall, ECCS model, and many kinds of panels and models. This service hall is incorporated in the course of study and observation of civics. The good environmental effects to fishes and shells are explained in this service hall. Official buildings and schools are built near the service hall utilizing the tax and grant concerning power generation. This service hall contributes to give much freedom from anxiety to the public by the tour. (Nakai, Y.)

  2. Preliminary irradiation test results from the Yankee Atomic Electric Company reactor vessel test irradiation program

    International Nuclear Information System (INIS)

    Biemiller, E.C.; Fyfitch, Stephen; Campbell, C.A.

    1994-01-01

    The Yankee Atomic Electric Company test irradiation program was implemented to characterize the irradiation response of representative Yankee Rowe reactor vessel beltline plate materials and to remove uncertainties in the analysis of existing irradiation data on the Yankee Rowe reactor vessel steel. Plate materials each containing 0.24 w/o copper, but different nickel contents at 0.63 w/o and 0.19 w/o, were heat treated to simulate the Yankee vessel heat treatment (austenitized at 982 o C (1800 o F)) and to simulate Regulatory Guide 1.99 database materials (austenitized at 871 o C (1600 o F)). These heat treatments produced different microstructures so the effect of microstructure on irradiation damage sensitivity could be tested. Because the nickel content of the test plates varied and the copper level was constant, the effect of nickel on irradiation embrittlement was also tested. Correlation monitor material, HSST-02, was included in the program to benchmark the Ford Nuclear Reactor (University of Michigan Test Reactor) which had never been used before for this type of irradiation program. Materials taken from plate surface locations (versus 1/4 T) were included to test whether or not the improved toughness properties of the plate surface layer, resulting from the rapid quench, are maintained after irradiation. If the improved properties are maintained, pressurized thermal shock calculations could utilize this margin. Finally, for one experiment, irradiations were conducted at two irradiation temperatures (260 o C and 288 o C) to determine the effect of irradiation temperature on embrittlement. (Author)

  3. Interim report on the accident at Fukushima Nuclear Power Stations of Tokyo Electric Power Company

    International Nuclear Information System (INIS)

    2011-12-01

    The Investigation Committee on the Accident at the Fukushima Nuclear Power Stations (the Investigation Committee) of Tokyo Electric Power Company (TEPCO) was established by the Cabinet decision on May 24, 2011. Its objectives are: to conduct investigation for finding out the causes of accidents at the Fukushima Dai-ichi Nuclear Power Station (Fukushima Dai-ichi NPS) and Fukushima Dai-ni Nuclear Power Station (Fukushima Dai-ni NPS) of TEPCO as well as the causes of accident damage; and to make policy recommendations for limiting the expansion of damage and preventing reoccurrence of similar accidents. The Investigation Committee has conducted its investigation and evaluation since its first meeting on June 7, 2011. Its activities included: site visits to the Fukushima Dai-ichi and Dai-ni NPSs, as well as to other facilities; hearing of heads of local governments around the Fukushima Dai-ichi NPS; and hearing of people concerned through interviews mainly arranged by the Secretariat. As of December 16, 2011, the number of interviewees reached 456. The investigation and evaluation by the Investigation Committee are still ongoing and the Interim Report does not cover every item that the Committee aims at investigating and evaluating. Fact-finding of even some of those items discussed in the Interim Report are not yet completed. The Investigation Committee continues to conduct its investigation and evaluation and will issue its Final Report in the summer of 2012. This brief executive summary covers mainly considerations and evaluation of the issues in Chapter VII of the Interim Report, with brief reference to Chapters I to VI. The Investigation Committee recommendations are printed in bold. (author)

  4. Municipal energy concepts. A service task for electric utility companies; Kommunale Energiekonzepte. Eine Dienstleistungsaufgabe fuer Energieversorgungsuntemehmen

    Energy Technology Data Exchange (ETDEWEB)

    Just, W. [Stadtwerke Gelsenkirchen GmbH (Germany)

    1994-11-01

    The article explains to what extent suitable measures can be realized and supported in a municipality with municipal energy concepts or even climate protection concepts. The target is to attain with limited financial means the most favourable economic and ecological effects in the municipality or in the region. Many electric utilities have in the last years forced the realization of energy conservation measures and have become energy service companies. With their expert knowledge they are ideal partners for politics, public adminstration and citizens. They have the best qualificatons for the development and realization of municipal concepts. In many cases it shows that with detailed studies the target can be quicker and more effectively attained as with extensive, time-consuming and expensive studies which are not particularly realization-oriented. The report is to give examples which might be helpful for the development of a concept. (orig./UA) [Deutsch] Der Beitrag erlaeutert, inwieweit umfangreiche kommunale Energiekonzepte oder sogar Klimaschutzkonzepte geeignete Massnahmen in der Kommune realisieren und foerdern koennen. Ziel sollte sein, mit begrenztem Mitteleinsatz die oekonomisch-oekologisch groessten Effekte in der Kommune bzw. in der Region zu erzielen. Viele Energie-Versorgungsunternehmen haben in den letzten Jahren die Realisierung von Energieparmassnahmen vorangetrieben und sich zu Energie-Dienstleistungsunternehmen entwickelt. Mit ihrer Sachkompetenz sind sie der ideale Partner fuer Politik, oeffentliche Verwaltung und Buerger/innen. Sie bringen die besten Voraussetzungen mit bei der Erarbeitung und Umsetzung von kommunalen Konzepten. Vielfach zeigt sich, dass Detailkonzepte schneller und wirkungsvoller zum Ziel fuehren, als umfachreiche, zeitaufwendige und teure Studien, die wenig umsetzungsorientiert sind. Die nachfolgenden Ausfuehrungen sind als Beispiele gedacht. Sie koennen Anregungen fuer die Erstellung eines Konzeptes vermitteln. (orig./UA)

  5. Revenue cap regulation in a deregulated electricity market : effects on a grid company

    OpenAIRE

    Bjørndal, Mette; Jörnsten, Kurt

    2002-01-01

    In 1997 an incentive-based regulation was introduced for Norwegian transmission and distribution companies. Under the following revenue regulation regime, the permissible revenue of a grid company is adjusted annually, and during the first regulation period, the new revenue cap was determined on the basis of last year’s revenue cap, adjusting for inflation, productivity improvement, and load growth. The idea behind the load growth compensation factor was that the grid companies should be comp...

  6. COMPETITIVE FACTORS IN ERP SYSTEM IMPLEMENTATION: A CASE STUDY OF A COMPANY OF ELECTRIC GENERATORS

    OpenAIRE

    Prado, Emerson Luiz; Passanezi, Paula Meyer Soares

    2015-01-01

    The increasing globalization of markets and increased competitiveness has required the use of appropriate management information in decision-making of companies. The Enterprise Resource Planning (ERP) is an integrated information system widely used by managers in their decision making processes. This exploratory case study, conducted in the company Stemac S/A, aims to analyze the advantages and disadvantages of the ERP system and compares them the real needs of the company. Specifics objectiv...

  7. Resolution 147/012. It authorize the Central Libertador / SA aeolian generation company to generate an aeolian electricity source by an electric power generating plant located in Maldonado town 4 AA Catastral section, and the Sistema inerconectado Nacional connection

    International Nuclear Information System (INIS)

    2012-01-01

    This decree authorizes the generation of electricity using aeolian energy as the primary electricity source. This project was presented by the 'Libertador / S.A' aeolian generation company with the proposal to install an electrical plant in Maldonado town. This authorization is according to the Electric Wholesale Market regulation

  8. Performance of the Electric power companies of Burkina Faso, the Ivory Coast, Mali and Senegal, and their organizational models

    International Nuclear Information System (INIS)

    Girod, J.

    1993-01-01

    The history of the technical, economic, and financial performances of these four countries' power companies over the past two decades is recounted, and then interpreted as the result of the existing organizational models. The changes that have occurred can be understood in long-term perspective by comparing the performance of these companies to the characteristics, rules, and objectives used to define the models, which also helps explain the history of performance indicator variations. Two models are defined: one for the physical plant and one for the management. These correspond to two successive phases in the organization and operation of the electrical sector. Rural electrification and regional interconnection will be important factors in any new model or models developed for the future, because the forms they take is likely to modify the characteristics of these national power companies. 26 refs., 1 fig., 3 tabs

  9. A three-stage short-term electric power planning procedure for a generation company in a liberalized market

    International Nuclear Information System (INIS)

    Nabona, Narcis; Pages, Adela

    2007-01-01

    In liberalized electricity markets, generation companies bid their hourly generation in order to maximize their profit. The optimization of the generation bids over a short-term weekly period must take into account the action of the competing generation companies and the market-price formation rules and must be coordinated with long-term planning results. This paper presents a three stage optimization process with a data analysis and parameter calculation, a linearized unit commitment, and a nonlinear generation scheduling refinement. Although the procedure has been developed from the experience with the Spanish power market, with minor adaptations it is also applicable to any generation company participating in a competitive market system. (author)

  10. A study of the contract terms offered by the regional electricity companies to generators of renewable energy outside the NFFO

    International Nuclear Information System (INIS)

    Williams, N.C.; Limbrick, A.J.

    1996-01-01

    The aim of this study was to review the terms and conditions of contract for the purchase of renewable energy currently offered by the Regional Electricity Companies (RECs) outside the Non-Fossil Fuel Obligation (NFFO), through consultation with electricity generators. It focused on projects contracted under the first and second tranches of the NFFO, and those which have been developed outside this support mechanism (both renewable and fossil-fuelled), but which are characterised by being ''embedded'' in the RECs' distribution networks. (UK)

  11. An FAHP-TOPSIS framework for analysis of the employee productivity in the Serbian electrical power companies

    Directory of Open Access Journals (Sweden)

    Snezana Pavle Knezevic

    2017-09-01

    Full Text Available The aim of this paper is to apply an integrated model, which combines methods of classical and fuzzy Multi-criteria decision making (MCDM in selected six large equity companies from the Serbian energy sector. The data considered are retrieved from the official financial statements. Four main criteria were analyzed, identified by the previous researchers and pointing to the employees productivity: Operating income/Number of employees, Equity/Number of employees, Net income/Number of employees and Total assets/Number of employees. The contribution of this paper lies in the application of a hybrid model that integrates two MCDM methods: Fuzzy Analytic Hierarchy Process (FAHP and Technique for Order Performance by Similarity to Ideal Solution (TOPSIS to analyse the employee productivity in selected D-Electrical power supply companies operating in Serbia. The FAHP is an effective method for mathematical representation of uncertain and imprecise evaluations made by humans, while the TOPSIS method is an efficient way to rank the alternatives. Results show that operating income is of highest importance for estimating employee productivity and decision making, while equity is of the weakest. Furthermore, the most productive operations in large enterprises from selected companies of the sector D-Electrical power supply are found in the company PC EPS Beograd, and the lowest are in the ED Center llc Kragujevac.

  12. Barriers to electricity load shift in companies: A survey-based exploration of the end-user perspective

    International Nuclear Information System (INIS)

    Olsthoorn, Mark; Schleich, Joachim; Klobasa, Marian

    2015-01-01

    As countries move toward larger shares of renewable electricity, the slow diffusion of active electricity load management should concern energy policy makers and users alike. Active load management can increase capacity factors and thereby reduce the need for new capacity, improve reliability, and lower electricity prices. This paper conceptually and empirically explores barriers to load shift in industry from an end-user perspective. An online survey, based on a taxonomy of barriers developed in the realm of energy efficiency, was carried out among manufacturing sites in mostly Southern Germany. Findings suggest that the most important barriers are risk of disruption of operations, impact on product quality, and uncertainty about cost savings. Of little concern are access to capital, lack of employee skills, and data security. Statistical tests suggest that companies for which electricity has higher strategic value rate financial and regulatory risk higher than smaller ones. Companies with a continuous production process report lower barrier scores than companies using batch or just-in-time production. A principal component analysis clusters the barriers and multivariate analysis with the factor scores confirms the prominence of technical risk as a barrier to load shift. The results provide guidance for policy making and future empirical studies. - Highlights: • We quantitatively assess barriers to load shift adoption among manufacturing firms. • Conceptually, we build on the literature on barriers to energy efficiency. • The most important barriers are interference with production and with product quality. • Companies with a continuous production process report lower barrier scores. • The barriers to load shift may be organized in distinct clusters via principal component analysis

  13. An agent-based simulation of power generation company behavior in electricity markets under different market-clearing mechanisms

    International Nuclear Information System (INIS)

    Aliabadi, Danial Esmaeili; Kaya, Murat; Şahin, Güvenç

    2017-01-01

    Deregulated electricity markets are expected to provide affordable electricity for consumers through promoting competition. Yet, the results do not always fulfill the expectations. The regulator's market-clearing mechanism is a strategic choice that may affect the level of competition in the market. We conceive of the market-clearing mechanism as composed of two components: pricing rules and rationing policies. We investigate the strategic behavior of power generation companies under different market-clearing mechanisms using an agent-based simulation model which integrates a game-theoretical understanding of the auction mechanism in the electricity market and generation companies' learning mechanism. Results of our simulation experiments are presented using various case studies representing different market settings. The market in simulations is observed to converge to a Nash equilibrium of the stage game or to a similar state under most parameter combinations. Compared to pay-as-bid pricing, bid prices are closer to marginal costs on average under uniform pricing while GenCos' total profit is also higher. The random rationing policy of the ISO turns out to be more successful in achieving lower bid prices and lower GenCo profits. In minimizing GenCos' total profit, a combination of pay-as-bid pricing rule and random rationing policy is observed to be the most promising. - Highlights: • An agent-based simulation of generation company behavior in electricity markets is developed. • Learning dynamics of companies is modeled with an extended Q-learning algorithm. • Different market clearing mechanisms of the regulator are compared. • Convergence to Nash equilibria is analyzed under different cases. • The level of competition in the market is studied.

  14. 76 FR 55111 - United States v. General Electric Co., et al.; Proposed Final Judgment and Competitive Impact...

    Science.gov (United States)

    2011-09-06

    ... automation controls. Converteam manufactures and assembles medium-voltage large electric motors in facilities... conversion engineering company focusing on motors, generators, drives, converters and automation controls... Electric Machinery Business used in the design, development, production, marketing, servicing, distribution...

  15. 76 FR 70166 - Electrical Standards for Construction and General Industry; Extension of the Office of Management...

    Science.gov (United States)

    2011-11-10

    ...] Electrical Standards for Construction and General Industry; Extension of the Office of Management and Budget... contained in the Electrical Standards for Construction (29 CFR part 1926, Subpart K) and for General... maintenance of electric utilization equipment that prevent death and serious injuries among construction and...

  16. THE IMPORTANCE OF COLLECTING ECONOMIC AND OTHER GENERAL FACTORS’ INFLUENCE ON THE VALUE OF PUBLIC COMPANIES IN SERBIA

    Directory of Open Access Journals (Sweden)

    SLOBODAN POPOVIĆ

    2016-06-01

    Full Text Available To make the right decision in regard to the expression of the value of property, equipment or something else, first for appraiser it is necessary to examine the general economic and other factors that may affect the expression of the value of the company. Especially there is a need to pay attention to devote to the expression value of a public company, because the public companies manage property that stems in part by funds from the budget. This is especially important in the case of a country that aspires to become an EU member. The Republic of Serbia signed the first two chapters with the EU in December 2015. Chapter 32 imperatively requires that the Republic of Serbia begins important application of fair expression of value of the property of public enterprises, because it is a section that requires audit activities of the entire public users, and therefore the company.

  17. Reactor coolant pump type RUV for Westinghouse Electric Company LLC reactor AP1000 TM

    International Nuclear Information System (INIS)

    Baumgarten, S.; Brecht, B.; Bruhns, U.; Fehring, P.

    2010-01-01

    The RUV is a reactor coolant pump, specially designed for the Westinghouse Electric Company LLC AP1000 TM reactor. It is a hermetically sealed, wet winding motor pump. The RUV is a very compact, vertical pump/motor unit, designed to fit into the compartment next to the reactor pressure vessel. Each of the two steam generators has two pump casings welded to the channel head by the suction nozzle. The pump/motor unit consists of a pump part, where a semi-axial impeller/diffuser combination is mounted in a one-piece pump casing. Computational Fluid Dynamics methods combined with various hydraulic tests in a 1:2 scale hydraulic test assure full compliance with the specific customer requirements. A short and rigid shaft, supported by a radial bearing, connects the impeller with the high inertia flywheel. This flywheel consists of a one-piece forged stainless steel cylinder, with an option for several smaller heavy metal cylinders inside. The flywheel is located inside the thermal barrier, which forms part of the pressure boundary. A specific arrangement of cooling water circuits guarantees a homogeneous temperature distribution in and around the flywheel, minimizes the friction losses of the flywheel and protects the motor from hot coolant. The driving torque is transmitted by the motor shaft, which itself is supported by two radial bearings. A three-phase, high-voltage squirrel-cage induction motor generates the driving torque. Due to the wet winding concept it is possible to achieve positive effects regarding motor lifetime. The cooling water is forced through the stator windings and the gap between rotor and stator by an auxiliary impeller. Furthermore, this wet winding motor concept has higher efficiency as compared to a canned motor since there are no eddy current losses. As part of the design process and in addition to the hydraulic scale model, a complete half scale model pump was built. It was used to verify the calculations performed like coast

  18. Preliminary irradiation test results from the Yankee Atomic Electric Company reactor vessel test irradiation program

    International Nuclear Information System (INIS)

    Biemiller, E.C.; Fyfitch, S.; Campbell, C.A.

    1993-01-01

    The Yankee Atomic Electric Company test irradiation program was implemented to characterize the irradiation response of representative Yankee Rowe reactor vessel beltline plate materials and to remove uncertainties in the analysis of existing irradiation data on the Yankee Rowe reactor vessel steel. Plate materials each containing 0.24 w/o copper, but different nickel contents at 0.63 w/o and 0.19 w/o, were heat treated to simulate the Yankee vessel heat treatment (austenitized at 1800 deg F) and to simulate Regulatory Guide 1.99 database materials (austenitized at 1600 deg. F). These heat treatments produced different microstructures so the effect of microstructure on irradiation damage sensitivity could be tested. Because the nickel content of the test plates varied and the copper level was constant, the effect of nickel on irradiation embrittlement was also tested. Correlation monitor material, HSST-02, was included in the program to benchmark the Ford Nuclear Reactor (U. of Michigan Test Reactor) which had never been used for this type of irradiation program. Materials taken from plate surface locations (vs. 1/4T) were included to test whether or not the improved toughness properties of the plate surface layer, resulting from the rapid quench, is maintained after irradiation. If the improved properties are maintained, pressurized thermal shock calculations could utilize this margin. Finally, for one experiment, irradiations were conducted at two irradiation temperatures (500 deg. F and 550 deg. F) to determine the effect of irradiation temperature on embrittlement. The preliminary results of the irradiation program show an increase in T 30 shift of 69 deg. F for a decrease in irradiation temperature of 50 deg. F. The results suggest that for nickel bearing steels, the superior toughness of plate surface material is maintained after irradiation and for the copper content tested, nickel had no apparent effect on irradiation response. No apparent microstructure

  19. Standard Technical Specifications, General Electric plants, BWR/4

    International Nuclear Information System (INIS)

    1992-09-01

    This NUREG contains improved Standard Technical Specifications (STS) for General Electric Plants, BWR/6, and documents the positions of the Nuclear Regulatory Commission based on the B ampersand W Owners Group's proposed STS. This document is the result of extensive technical meetings and discussions among the NRC staff, the Nuclear Steam Supply System (NSSS) Owners Groups, the NSSS vendors, and the Nuclear Management and Resources Council (NUMARC). The improved STS were developed based on the criteria in the interim Commission Policy Statement on Technical Specification Improvements for Nuclear Power Reactors, dated February 6, 1987. The improved STS will be used as the basis for individual nuclear power plant licensees to develop improved plant-specific technical specifications. This report contains three volumes. Volume 1 contains the Specifications for all chapters and sections of the improved STS. Volume 2 contains the Bases for Chapters 2.0 and 3.0, and Sections 3.1--3.3 of the improved STS. This document Volume 3, contains the Bases for Sections 3.4--3.10 of the improved STS

  20. Standard Technical Specifications, General Electric Plants, BWR/6

    International Nuclear Information System (INIS)

    1992-09-01

    This NUREG contains improved Standard Technical Specifications (STS) for General Electric Plants, BWR/6, and documents the positions of the Nuclear Regulatory Commission based on the B ampersand W Owners Group's proposed STS. This document is the result of extensive technical meetings and discussions among the NRC staff, the Nuclear Steam Supply System (NSSS) Owners Groups, the NSSS vendors, and the Nuclear Management and Resources Council (NUMARC). The improved STS were developed based on the criteria in the interim Commission Policy Statement on Technical Specification Improvements for Nuclear Power Reactors, dated February 6, 1987. The improved STS will be used as the basis for individual nuclear power plant licensees to develop improved plant-specific technical specifications. This report contains three volumes. This document Volume 1, contains the Specifications for all chapters and sections of the improved STS. Volume 2 contains the Bases for Chapters 2.0 and 3.0, and Sections 3.1--3.3 of the improved STS. Volume 3 contains the Bases for Sections 3.4--3.10 of the improved STS

  1. Standard Technical Specifications, General Electric plants, BWR/4

    International Nuclear Information System (INIS)

    1992-09-01

    This NUREG contains improved Standard Technical Specifications (STS) for General Electric Plants, BWR/6, and documents the positions of the Nuclear Regulatory Commission based on the BWR Owners Group's proposed STS. This document is the result of extensive technical meetings and discussions among the NRC staff, the Nuclear Steam Supply System (NSSS) Owners Groups, the NSSS vendors, and the Nuclear Management and Resources Council (NUMARC). The improved STS were developed based on the criteria in the interim Commission Policy Statement on Technical Specification Improvements for Nuclear Power Reactors, dated February 6, 1987. The improved STS will be used as the basis for individual nuclear power plant licensees to develop improved plant-specific technical specifications. This report contains three volumes. This document Volume 1 contains the Specifications for all chapters and sections of the improved STS. Volume 2 contains the Bases for Chapters 2.0 and 3.0, and Sections 3.1--3.3 of the improved STS. Volume 3 contains the Bases for Sections 3.4--3.10 of the improved STS

  2. Standard Technical Specifications, General Electric Plants, BWR/6

    International Nuclear Information System (INIS)

    1992-09-01

    This NUREG contains improved Standard Technical Specifications (STS) for General Electric Plants, BWR/4, and documents the positions of the Nuclear Regulatory Commission based on the BWR Owners Group's proposed STS. This document is the result of extensive technical meetings and discussions among the NRC staff, the Nuclear Steam Supply System (NSSS) Owners Groups, the NSSS vendors, and the Nuclear Management and Resources Council (NUMARC). The improved STS were developed based on the criteria in the interim Commission Policy Statement on Technical Specification Improvements for Nuclear Power Reactors, dated February 6, 1987. The improved STS will be used as the basis for individual nuclear power plant licensees to develop improved plant-specific technical specifications. This report contains three volumes. Volume 1 contains the Specifications for all chapters and sections of the improved STS. Volume 2 contains the Bases for Chapters 2.0 and 3.0, and Sections 3.1--3.3 of the improved STS. Volume 3, contains the Bases for Sections 3.4--3.10 of the improved STS

  3. Generic risk insights for General Electric boiling water reactors

    International Nuclear Information System (INIS)

    Travis, R.; Taylor, J.; Chung, J.

    1991-05-01

    A methodology has been developed to extract generic risk-based information from probabilistic risk assessments (PRAs) of General Electric boiling water rectors and applying the insights gained to plants that have not been subjected to a PRA. The available risk assessments (six plants) were examined to identify the most probable, i.e., dominant accident sequences at each plants. The goal was to include all sequences which represented at least 80% of core damage frequency. If the same plant specific dominant accident sequence appeared within this boundary in at least two plant PRAs, the sequence was considered to be a representative sequence. Eight sequences met this definition. From these sequences, the most important component failures and human error that contributed to each sequence have been prioritized. Guidance is provided to prioritize the representative sequences and modify selected basic events that have been shown to be sensitive to the plant specific design or operating variations of the contributing PRAs. This risk-based guidance can be used for utility and NRC activities including operator training, maintenance, design review, and inspections. 13 refs., 6 tabs

  4. Standard Technical Specifications, General Electric plants, BWR/6

    International Nuclear Information System (INIS)

    1992-09-01

    This NUREG contains improved Standard Technical Specifications (STS) for General Electric Plants, BWR/6, and documents the positions of the Nuclear Regulatory Commission based on the B ampersand W Owners Group's proposed STS. This document is the result of extensive technical meetings and discussions among the NRC staff, the Nuclear Steam Supply System (NSSS) Owners Groups, the NSSS vendors, and the Nuclear Management and Resources Council (NUMARC). The improved STS were developed based on the criteria in the interim Commission Policy Statement on Technical Specification Improvements for Nuclear Power Reactors, dated February 6, 1987. The improved STS will be used as the basis for individual nuclear power plant licensees to develop improved plant-specific technical specifications. This report contains three volumes. Volume 1 contains the Specifications for all chapters and sections of the improved STS. This document Volume 2, contains the Bases for Chapters 2.0 and 3.0, and Sections 3.1--3.3 of the improved STS. Volume 3 contains the Bases for Sections 3.4--3.10 of the improved STS

  5. 75 FR 78979 - Application to Export Electric Energy; Twin Rivers Paper Company Inc.

    Science.gov (United States)

    2010-12-17

    ... DEPARTMENT OF ENERGY [OE Docket No. EA-366] Application to Export Electric Energy; Twin Rivers... electric energy from the United States to Canada pursuant to section 202(e) of the Federal Power Act. DATES... received an application from Twin Rivers for authority to transmit electric energy from the United States...

  6. 78 FR 11633 - Application To Export Electric Energy; ConocoPhillips Company

    Science.gov (United States)

    2013-02-19

    ... DEPARTMENT OF ENERGY [OE Docket No. EA-336-A] Application To Export Electric Energy; Conoco..., DOE issued Order No. EA-336, which authorized CoP to transmit electric energy from the United States... facilities to the transmission grid. CoP states that all of the electric energy that CoP proposes to export...

  7. A generalization information management system applied to electrical distribution

    Energy Technology Data Exchange (ETDEWEB)

    Geisler, K.I.; Neumann, S.A.; Nielsen, T.D.; Bower, P.K. (Empros Systems International (US)); Hughes, B.A.

    1990-07-01

    This article presents a system solution approach that meets the requirements being imposed by industry trends and the electric utility customer. Specifically, the solution addresses electric distribution management systems. Electrical distribution management is a particularly well suited area of application because it involves a high diversity of tasks, which are currently supported by a proliferation of automated islands. Islands of automation which currently exist include (among others) distribution operations, load management, automated mapping, facility management, work order processing, and planning.

  8. A Project Strategic Index proposal for portfolio selection in electrical company based on the Analytic Network Process

    Energy Technology Data Exchange (ETDEWEB)

    Smith-Perera, Aida [Universidad Metropolitana de Caracas, Departamento de Gestion Tecnologica, Caracas 1071, Edo Miranda (Venezuela); Garcia-Melon, Monica; Poveda-Bautista, Rocio; Pastor-Ferrando, Juan-Pascual [Universidad Politecnica de Valencia, Departamento de Proyectos de Ingenieria, Camino de vera s/n 46022 Valencia (Spain)

    2010-08-15

    In this paper a new approach to prioritize project portfolio in an efficient and reliable way is presented. It is based on strategic objectives of the company and multicriteria decision methods. The paper introduces a rigorous method with acceptable complexity which seeks to assist managers of a big Electrical Company of Venezuela to distribute the annual budget among the possible improvement actions to be conducted on the electrical network of Caracas. A total of 15 network improvement actions grouped into three clusters according to the strategic objectives of the company have been analyzed using the Project Strategic Index (PSI) proposed. The approach combines the use of the Analytic Network Process (ANP) method with the information obtained from the experts during the decision-making process. The ANP method allows the aggregation of the experts' judgments on each of the indicators used into one Project Strategic Index. In addition, ANP is based on utility ratio functions which are the most appropriate for the analysis of uncertain data, like experts' estimations. Finally, unlike the other multicriteria techniques, ANP allows the decision problem to be modelled using the relationships among dependent criteria. The participating experts coincided in the appreciation that the method proposed in this paper is useful and an improvement from traditional budget distribution techniques. They find the results obtained coherent, the process seems sufficiently rigorous and precise, and the use of resources is significantly less than in other methods. (author)

  9. A Project Strategic Index proposal for portfolio selection in electrical company based on the Analytic Network Process

    International Nuclear Information System (INIS)

    Smith-Perera, Aida; Garcia-Melon, Monica; Poveda-Bautista, Rocio; Pastor-Ferrando, Juan-Pascual

    2010-01-01

    In this paper a new approach to prioritize project portfolio in an efficient and reliable way is presented. It is based on strategic objectives of the company and multicriteria decision methods. The paper introduces a rigorous method with acceptable complexity which seeks to assist managers of a big Electrical Company of Venezuela to distribute the annual budget among the possible improvement actions to be conducted on the electrical network of Caracas. A total of 15 network improvement actions grouped into three clusters according to the strategic objectives of the company have been analyzed using the Project Strategic Index (PSI) proposed. The approach combines the use of the Analytic Network Process (ANP) method with the information obtained from the experts during the decision-making process. The ANP method allows the aggregation of the experts' judgments on each of the indicators used into one Project Strategic Index. In addition, ANP is based on utility ratio functions which are the most appropriate for the analysis of uncertain data, like experts' estimations. Finally, unlike the other multicriteria techniques, ANP allows the decision problem to be modelled using the relationships among dependent criteria. The participating experts coincided in the appreciation that the method proposed in this paper is useful and an improvement from traditional budget distribution techniques. They find the results obtained coherent, the process seems sufficiently rigorous and precise, and the use of resources is significantly less than in other methods. (author)

  10. THE COST OF CREDIBILITY: THE COMPANY OF GENERAL FARMS AND FISCAL STAGNATION IN EIGHTEENTH-CENTURY FRANCE

    Directory of Open Access Journals (Sweden)

    Noel D. Johnson

    2006-01-01

    Full Text Available The Company of General Farms, a quasi-private collector of about half the French taxes in the eighteenth century, was one of the largest lenders to the Crown. The relationship between the Crown and General Farms fits the model of sovereign debt as a contingent claim. Lending is sustained in contingent claims models if the lender credibly commits to withhold funds from the sovereign if he defaults. The General Farms maintained this commitment with amonopsony of the Crown's access to taxes and borrowed funds. When revolution threatened, the monopsony stood between the Crown and reform of the fiscal system. The history of the Company of General Farms shows how a contingent claims equilibrium can raise the cost of legitimate reform.

  11. Assessing the financial positions of Ontario's new electricity companies

    Energy Technology Data Exchange (ETDEWEB)

    Connell, T. (Standard and Poor' s, Toronto, ON (Canada))

    1999-01-01

    This paper describes the methodology, including the criteria factors, comparable ratings and key credit issues used in assessing the financial positions of Ontario Power Generation Inc., and the Ontario Hydro Services Company. The rating criteria factors include both business factors (such as ownership structure, regulation, service area, operations, management, etc.,) and financial factors (e.g. financial policies and guidelines, recent financial performance, margin analysis, capital structure and borrowing plans, financial projections and sensitivities). Key credit issues include considerations of competitive dynamics, nuclear portfolio performance (for Genco), regulatory changes, cost control, capital spending program, retail business exposure, future financial performance. Comparisons are made with corresponding positions of comparable entities in Australia, Finland, New Zealand, the UK, and the USA. In the case of Ontario Power Generation Inc., the company is assessed to have significant advantages initially, but various uncertainties over the medium term warrant a more cautious view of the credit profile. For the Ontario Hydro Services Company the business risks appear to be low and moderate leverage entails a strong, stable credit profile. The overall assessment of the two companies is that while certain questions such as the workability and credibility of the new industry structure, the problem of stranded debt and questions about the liquidity of market participants remain unsolved, Ontario Power Generation Inc., and the Ontario Hydro Services Company ratings compare favorably with ratings of global industry peers.

  12. Assessing the financial positions of Ontario`s new electricity companies

    Energy Technology Data Exchange (ETDEWEB)

    Connell, T. [Standard and Poor`s, Toronto, ON (Canada)

    1999-11-01

    This paper describes the methodology, including the criteria factors, comparable ratings and key credit issues used in assessing the financial positions of Ontario Power Generation Inc., and the Ontario Hydro Services Company. The rating criteria factors include both business factors (such as ownership structure, regulation, service area, operations, management, etc.,) and financial factors (e.g. financial policies and guidelines, recent financial performance, margin analysis, capital structure and borrowing plans, financial projections and sensitivities). Key credit issues include considerations of competitive dynamics, nuclear portfolio performance (for Genco), regulatory changes, cost control, capital spending program, retail business exposure, future financial performance. Comparisons are made with corresponding positions of comparable entities in Australia, Finland, New Zealand, the UK, and the USA. In the case of Ontario Power Generation Inc., the company is assessed to have significant advantages initially, but various uncertainties over the medium term warrant a more cautious view of the credit profile. For the Ontario Hydro Services Company the business risks appear to be low and moderate leverage entails a strong, stable credit profile. The overall assessment of the two companies is that while certain questions such as the workability and credibility of the new industry structure, the problem of stranded debt and questions about the liquidity of market participants remain unsolved, Ontario Power Generation Inc., and the Ontario Hydro Services Company ratings compare favorably with ratings of global industry peers.

  13. Development on power distribution technologies of four electric power companies in Japan. The Kansai Electric Power Co. , Inc

    Energy Technology Data Exchange (ETDEWEB)

    1989-07-01

    Since dependency upon electric power has been rising yearly with the development of industry and the progress of information-oriented society, various kinds of technical development are needed to supply electricity. Furthermore, amenity of people's living has been highly intended, and life style has varied. Consequently, customers' needs for energy including related services have varied remarkably, and each customer has selected energy more subjectively from the wide range of viewpoint such as reliability, handiness, cleanliness, safety, and economic efficiency. In such situation, the power distribution section of Kansai Electric Power settled four themes for major technical development and has been promoting them. Four themes are as follows; to develop a total automation system for power distribution, to promote 20kV/400V-class power distribution, to develop techniques to form facilities harmonizing with local amenity, and to make business management efficient with the advanced NC system. 3 figs., 4 tabs.

  14. Forecasted electric power demands for the Delmarva Power and Light Company. Volume 1 and Volume 2. Documentation manual

    International Nuclear Information System (INIS)

    Estomin, S.L.; Beach, J.E.

    1990-10-01

    The two-volume report presents the results of an econometric forecast of peak load and electric power demands for the Delmarva Power and Light Company (DP ampersand L) through the year 2008. Separate sets of models were estimated for the three jurisdictions served by DP ampersand L: Delaware, Maryland and Virginia. For both Delaware and Maryland, econometric equations were estimated for residential, commercial, industrial, and streetlighting sales. For Virginia, equations were estimated for residential, commercial plus industrial, and streetlighting sales; separate industrial and commercial equations were not estimated for Virginia due to the relatively small size of DP ampersand L's Virginia Industrial load. Wholesale sales were econometrically estimated for the DP ampersand L system as a whole. In addition to the energy sales models, an econometric model of annual (summer) peak demand was estimated for the Company

  15. Market (in)efficiency in valuing electric utilities-The case of Norwegian generating companies

    International Nuclear Information System (INIS)

    Kjaerland, Frode

    2010-01-01

    After deregulation of the energy market in Norway, a number of mergers and acquisitions of hydropower generating companies have taken place. However, valuation of these companies has proved controversial. From an ex-post perspective, there is support for the criticism that generation assets have been sold too cheaply. This article presents a simple valuation model providing evidence of how value has evolved. On the basis of these results, we discuss the valuation from an ex ante perspective and in the light of the market efficiency hypothesis of (Fama, 1970) and (Fama, 1991).

  16. Communications architecture for an electric company, European utility communications architecture, EURUCA

    Energy Technology Data Exchange (ETDEWEB)

    Uuspaeae, P [VTT Energy, Espoo (Finland)

    1998-08-01

    The scope of this research is integration and interoperability of various information systems and data communications for electric utilities. Utility Communication Architecture refers to an overall view of the communications needs and communication systems in an electric utility. The objective is to define and specify suitable and compatible communications procedures within the Utility and also to outside parties

  17. 78 FR 7774 - Alaska Electric Light and Power Company; Notice of Preliminary Permit Application Accepted for...

    Science.gov (United States)

    2013-02-04

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14480-000] Alaska Electric... Comments, Motions To Intervene, and Competing Applications On January 11, 2013, Alaska Electric Light and... single 3.5-megavolt-ampere (MVA) transformer to adjust voltage to 23 kilovolts; and (7) appurtenant...

  18. The French Electricity Company (EDF) and GEC ALSTHOM have signed the agreement for Chinese Laibin B electric power plant

    International Nuclear Information System (INIS)

    1997-01-01

    EDF and GEC ALSTHOM together with the government of Chinese Province Guangxi have organized in Pekin on 3 september 1997 a ceremony for signing a BOOT (Build, Own, Operate, Transfer) contract for the Coal Power Plant (2 x 360 MW) at Laibin B. This is the first Chinese BOOT contract in the power domain entirely financed by foreign capital. The two western companies which were retained for this project, following an international call for offers, invest USD 150 million of its own founds in this USD 600 million project. They will hold 60% and 40% of the capital of the company created for this project, respectively. The construction power plant is planned to be completed at the end of 1999 - beginning of 2000. After 15 years of industrial operation the power plant will be transferred to the autonomous government of the Province Guangxi. The communique contains the following 8 files: 1. The Laibin B power plant; 2. Build, Own, Operate, Transfer; 3. The autonomous Guangxi Province; 4. An outline of EDF in China; 5. Profile/activities of GEC ALSTHOM in China; 6. The 'Credit Agricole Indosuez' in China; 7. BZW Barclays PLC; 8. HSBC Investment Banking in China

  19. Early site review report for the Sundesert site, San Diego Gas and Electric Company. Project No. 558

    International Nuclear Information System (INIS)

    1977-01-01

    The purpose of the report is to present the Nuclear Regulatory Commission's evaluation of several of the matters relating to the suitability of the Sundesert site near Blythe, California, on which the San Diego Gas and Electric Company proposes to build the Sundesert Nuclear Plant, Units 1 and 2. The report summarizes the results of the technical evaluation of the suitability of the proposed Sundesert site for a nuclear plant and delineates the scope of the technical matters considered in evaluating the suitability of the site

  20. The adaptation of the major network companies to the liberalization of the electricity in Europe: comparison between France and Germany

    International Nuclear Information System (INIS)

    Courivaud, H.

    2001-01-01

    The liberalization of network activities is a factor which is now topical within France, Europe and the rest of the world. The main economic thinking at the dawn of the 21. century is full of praise for the emergence of heightened competition, which ensures optimal allocation of investments within the electricity industry, brings down prices for the benefit of both minor and major consumers alike, and finally stimulates innovation and creativeness on the part of companies. Curiously, it seems to overlook the fact that the staged introduction of monopolies and the establishment of exclusive rights in favour of certain operators several decades ago offered all of the same economic advantages. In addition to this, it rarely mentions the political and social effects of such changes, as if the latter are the subject of some major consensus within the public opinion. Whatever the circumstances, as a result of globalization, the major electricity network companies have decided either by themselves or following recommendations by the legislators to internationalize and to carry out acquisitions, enhancing market forces which up to the present remained latent. In Europe, this adaptation is not uniform in nature however. It needs to take full account of national and international characteristics regarding the economic and social organisation of the Member States of the European Union, and should certainly not be allowed to sidestep certain democratic requirements and the observance of basic rights other than those related to the freedom to do business. These include respect for the environment, consultation with the social partners within the company and outside, respect for the rights of consumers' and in particular those without any power in the marketplace, not to mention respect for the dignity of those involved in social life. The necessity of reconciling the new opportunities for open competition created through liberalization and respect for basic rights does not seem

  1. Basic Guidelines to Introduce Electric Circuit Simulation Software in a General Physics Course

    Science.gov (United States)

    Moya, A. A.

    2018-01-01

    The introduction of electric circuit simulation software for undergraduate students in a general physics course is proposed in order to contribute to the constructive learning of electric circuit theory. This work focuses on the lab exercises based on dc, transient and ac analysis in electric circuits found in introductory physics courses, and…

  2. Low Temperature Noise and Electrical Characterization of the Company Heterojunction Field-Effect Transistor

    Science.gov (United States)

    Cunningham, Thomas J.; Gee, Russell C.; Fossum, Eric R.; Baier, Steven M.

    1993-01-01

    This paper discusses the electrical properties of the complementary heterojunction field-effect transistor (CHFET) at 4K, including the gate leakage current, the subthreshold transconductance, and the input-referred noise voltage.

  3. National Account Energy Alliance Final Report for the Basin Electric Project at Northern Border Pipeline Company's Compressor Station #7, North Dakota

    Energy Technology Data Exchange (ETDEWEB)

    Sweetzer, Richard [Exergy Partners Corp.; Leslie, Neil [Gas Technology Institute

    2008-02-01

    A field research test and verification project was conducted at the recovered energy generation plant at Northern Border Pipeline Company Compressor Station #7 (CS#7) near St. Anthony. Recovered energy generation plant equipment was supplied and installed by ORMAT Technologies, Inc. Basin Electric is purchasing the electricity under a purchase power agreement with an ORMAT subsidiary, which owns and operates the plant.

  4. Weight restrictions on geography variables in the DEA benchmarking model for Norwegian electricity distribution companies

    Energy Technology Data Exchange (ETDEWEB)

    Bjoerndal, Endre; Bjoerndal, Mette; Camanho, Ana

    2008-07-01

    The DEA model for the distribution networks is designed to take into account the diverse operating conditions of the companies through so-called 'geography' variables. Our analyses show that companies with difficult operating conditions tend to be rewarded with relatively high efficiency scores, and this is the reason for introducing weight restrictions. We discuss the relative price restrictions suggested for geography and high voltage variables by NVE (2008), and we compare these to an alternative approach by which the total (virtual) weight of the geography variables is restricted. The main difference between the two approaches is that the former tends to affect more companies, but to a lesser extent, than the latter. We also discuss how to set the restriction limits. Since the virtual restrictions are at a more aggregated level than the relative ones, it may be easier to establish the limits with this approach. Finally, we discuss implementation issues, and give a short overview of available software. (Author). 18 refs., figs

  5. Modification of reactor installation in the Genkai nuclear power plant No. 1 of Kyushu Electric Power Company, Inc

    International Nuclear Information System (INIS)

    1979-01-01

    The Nuclear Safety Commission recognized the adequacy concerning the inquiry which was offered from the Minister of International Trade and Industry on July 25, 1979, following the safety evaluation in the Ministry of International Trade and Industry, and decided to submit a report to the Minister of International Trade and Industry on July 26, 1979, about the modification of reactor installation in the Genkai nuclear power plant No. 1 of the Kyushu Electric Power Company, Inc. This is concerned to the application which was made from the president of the Kyushu Electric Power Company, Inc., to the Minister of International Trade and Industry on July 24, 1979. The content of the modification is to add a control circuit which is actuated by the signal of abnormal low pressure in a reactor to the circuit of actuating the emergency core cooling system of the plant. The influences on the safety protection system by the addition of the circuit transmitting safety injection signal and by the additions of an interlock circuit preventing the misoperation of pressurizer spray and of a block circuit of safety injection signal in case of the abnormal low pressure in a reactor were evaluated. The effects on the function and characteristics of the emergency core cooling system due to the addition of the control circuit were investigated, and it was recognized by the analysis that there is no effect in the pipe ruptures of both small and large scales. (Nakai, Y.)

  6. 18 CFR 367.9301 - Account 930.1, General advertising expenses for associated companies.

    Science.gov (United States)

    2010-04-01

    ... following labor items: (1) Supervision. (2) Preparing advertising material for newspapers, periodicals... expenses items: (1) Advertising in newspapers, periodicals, billboards, radio, and other similar forms of... advertising expenses for associated companies. 367.9301 Section 367.9301 Conservation of Power and Water...

  7. Modelo geral das atividades da empresa General model of company activities

    Directory of Open Access Journals (Sweden)

    José Celso Contador

    2001-12-01

    Full Text Available O modelo evidencia que as atividades de qualquer tipo de empresa, inclusive a de serviços, podem ser organizadas em quatro grupos (produção, atendimento, apoio e planejamento e que essa organização é aplicável à empresa como um todo, a qualquer órgão (departamento, seção e a qualquer célula de trabalho, inclusive a constituída por apenas um funcionário. O modelo, por mergulhar, como nenhum outro, nas profundezas da empresa, complementa outros modelos (Tavistock, Katz & Kahn, Kast & Rosenzweig. A comparação com o modelo da Cadeia de Valores de Porter e as vantagens apontadas no texto permitem concluir que o modelo é bastante adequado para a proposição de mudanças na empresa que melhorem sua posição competitiva.The model shows that the activities of any type of company, including service companies, can be divided into four groups (production, service, support, planning and that such organization is applicable to the company as a whole, to any part of it (division, department and even to single employees. Since the model, as no other, covers nearly all sections of the company, it complements other ones (Tavistock, Katz & Kahn, Kast & Rosenzweig. The comparison with Porter’s Chain of Values and the advantages shown in the text, allow the conclusion that this model is perfectly adequate to the proposed changes in the company and to the improvement of its competitiveness.

  8. Panel presentation: Impact of combination gas/electric companies on the use of natural gas

    International Nuclear Information System (INIS)

    Stalon, C.G.

    1992-01-01

    This paper looks at the advantages and disadvantages of combined gas and electric utilities. It uses a priori reasoning and empirical analysis to present a case that combined utilities actually have the power to do more good for the service area than two separate utilities striving to compete. Unfortunately, the monopoly status of a combined utility may seize the opportunity to maintain the status quo and stop innovation. Based on some simple research, the author found that most combination utilities' electric divisions had higher prices than comparable straight electric utilities, (2) most combination utilities' electric division had higher unit costs than comparable straight electric utilities, and (3) there was no statistical significant difference in price or unit costs between the gas divisions of combination utilities and straight gas utilities. The paper ends with a discussion of policy options and subsequent consequences of preserving the status quo, forced separation of all such combinations, and the review on a case-by-case basis of each combination utility

  9. Approach undertaken by our Company for leveling electric loads; Chubu Denryoku Kabushi Kaisha no fuka heijunka eno torikumi ni tsuite

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-07-01

    Measures for leveling the electric loads relying upon two facets - tariff system and business activities - in Chubu Electric Power Co., Inc. are presented. Firstly, the existing pricing systems for midnight electric power and electric light according to the period of time for the household as well as those of seasonal and time zone electric power, modifiable contract with the time zone and so forth for large industry users, together with a similar contract for the owner of regenerating installation are outlined. In addition, a price reduction system is indicated in favor of a scheduled shutdown of large industry operations as a means of avoiding electric consumption during weekdays in summer and between 13h and 16h when large demands exist. Further, a selective contract system put in service in 1995 and the price reduction for ice regenerating air conditioning system are cited. As for business facet, 1995 is regarded as the first year of the ice regenerator for its generalization through exhibition and promotive campaign to the foods processing industry, and the application of the latent heat regenerative system to perishable foods is recommended. Moreover, installation of energy saving type automatic vending machine, so-called eco-vendor is encouraged for its merit of peak-cut and energy price lowering. Lastly, activities to extend the use of electric calorifiers and the regenerative floor heating are mentioned. 2 figs., 1 tab.

  10. Preparing Canada`s power systems for transition to the Year 2000: Y2K readiness assessment results for Canadian electric utility companies: second quarter 1999

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-08-25

    The report describes the state of readiness of Canadian electric utility companies with respect to the Year 2000 computer challenge. It complements the North American Electric Reliability Council Report entitled `Preparing the Electric Power Systems of North America for Transition to the Year 2000: A Status and Work Plan.` Two surveys were employed to gather information for this report. The first, a detailed survey prepared by NERC, was forwarded to all major electric utilities that comprise the Bulk Electricity System in North America. CEA has removed the Canadian findings from the overall North American results, and has presented those findings in this report. The second was a shorter, more simplified study, conducted by CEA and Natural Resources Canada. Whereas small companies involved only in the distribution aspect of the electricity business were not asked to complete the NERC assessment, all Canadian electric utility companies were part of the shorter survey. Chapter 2 covers specifically the readiness status and project management for non-nuclear generation, nuclear generation, energy management systems, telecommunications systems, substation controls, system protection and distribution systems, business information systems, and small distribution companies.

  11. Construction of Industrial Ecosystem of an Electric Company under Ecological Perspective

    Science.gov (United States)

    Li, Xin; Zhang, Yuan; Wu, Han

    2018-01-01

    Be confronted with more and more fierce competition environment, only by constantly integrating, constructing and restructuring internal and external resources as well as capabilities can enterprises adapt themselves to the rapidly changing environment and maintain the advantages of sustained competition. Business competition has changed from product competition of single enterprise to competition of bussiness ecosystem. Therefore, how to build a business system is the key to win competition. This paper draws lessons from business ecosystem and industrial ecosystem concept and takes the subordinate industry company of a large enterprise as the research object. On the the basis of combing its characteristics and organizational structure, an industrial ecosystem is tired to constructed.

  12. Implementation of Supply Chain Management (SCM in pharmaceutical company, general principles and case study

    Directory of Open Access Journals (Sweden)

    Zoran Nakov

    2014-12-01

    Full Text Available Supply Chain Management (SCM in pharmaceutical industry is defined as a “responsible SCM” and its implementation is according to the principles of: business ethics, rights of labor and principles of healthy and safe working environment. Pharmaceutical companies with implemented “responsible SCM” have to use management systems to facilitate continuous improvement in accordance with their working principles. The main purpose of this management system is to ensure the consistency, reliability and continuous improvement of all workflows within an organization.The analyzed case describes the project of European generic pharmaceutical company, which intends to implement best practice SCM operations for five European manufacturing sites and European logistics organizations (active ingredients supply, distribution centers, affiliate customers and third party manufacturers. The main objectives of the project were the creation of the future improved To-Be situation through implementation of new SCM models to the existing To-Day situation.

  13. Do General Practices of Management Play Role as Drivers for Employee Job Satisfaction in Pakistani Entrepreneurial Companies?

    Directory of Open Access Journals (Sweden)

    Sergey Nikolaevich Polbitsyn

    2017-03-01

    Full Text Available Using general practices of management is management philosophy; many organizations practice these tools that endeavor to improve their efficiency and competitiveness in the business markets. It is an integrated approach to reaching and maintaining high-quality production and services focusing on the maintenance and continuous improvement of operations in order to satisfy or exceed the customer satisfaction. Many researchers have done a lot of work on other management practices; total quality management is an important one of them in this competitive era, which has rarely studied especially in small and medium size entrepreneurial companies in Pakistan. This quantitative research study tried to determine the impact of Total Quality Management practices on job satisfaction level of the employees of those small and medium size companies based on new and creative ideas in the capital city. The conducted survey among 550 employees of small and medium size entrepreneurial companies in the capital of Pakistan got 200 employees response properly in filling out the questionnaire. The collected data was analyzed after applying software (version 20 Statistical Package for Social Sciences. Multiple regression was applied to test the proposed model, which was found satisfied. Leadership and top management support were founded the most dominant practice among the selected Total Quality Management practices which has a significant effect on employee job satisfaction. The findings of this study prove that the implementation of Total Quality Management practices can help in increasing employees’ job satisfaction which intern would increase Productivity of small and medium size entrepreneurial companies.

  14. On generalization of electric field strength in longitudinally blown arcs

    OpenAIRE

    Yas'ko, O.I.; Esipchuk, A.M.; Qing, Z.; Schram, D.C.; Fauchais, P.

    1997-01-01

    Generalization of av. elec. field strength for different discharge conditions in longitudinally blown arcs is considered. Exptl. data for distinctive devices and different gases were used for phys. modeling. Anal. showed that heat transfer processes are responsible for I-E characteristic formation. Turbulent heat transfer is the most effective for atm. pressure discharges while convection plays the main role in vacuum arcs. A generalized I-E characteristic was obtained. [on SciFinder (R)

  15. Straight and chopped DC performance data for a General Electric 5BY436A1 DC shunt motor with a General Electric EV-1 controller

    Science.gov (United States)

    Edie, P. C.

    1981-01-01

    Both straight and chopped dc motor performance data for a General Electric 5BY436A1 motor with a General Electric EV-1 controller is presented in tabular and graphical formats. Effects of motor temperature and operating voltage are also shown. The maximum motor efficiency is approximately 85% at low operating temperatures in the straight dc mode. Chopper efficiency can be assumed to be 95% under all operating conditions. For equal speeds, the motor operated in the chopped mode develops slightly more torque and draws more current than it does in the straight mode.

  16. Safety Evaluation Report related to the renewal of the operating license for the General Electric-Nuclear Test Reactor (GE-NTR) (Docket No. 50-73)

    International Nuclear Information System (INIS)

    1984-09-01

    This Safety Evaluation Report for the application filed by the General Electric Company (GE) for a renewal license number R-33 to continue to operate its research reactor has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is owned and operated by GE and is located in Pleasanton, California. The staff concludes that the reactor can continue to be operated by GE without endangering the health and safety of the public

  17. Comprehensive Evaluation for Operating Efficiency of Electricity Retail Companies Based on the Improved TOPSIS Method and LSSVM Optimized by Modified Ant Colony Algorithm from the View of Sustainable Development

    Directory of Open Access Journals (Sweden)

    Dongxiao Niu

    2018-03-01

    Full Text Available The electricity market of China is currently in the process of a new institutional reform. Diversified electricity retail entities are gradually being established with the opening of the marketing electricity side. In the face of a complex market environment and fierce competition, the operating efficiency can directly reflect the current market position and development of electricity retail companies. TOPSIS method can make full use of the information of original data, calculate the distance between evaluated objects and the ideal solutions and get the relative proximity, which is generally used in the overall department and comprehensive evaluation of the benefits. Least squares support vector machine (LSSVM, with high convergence precision, helps save the training time of algorithm by solving linear equations and is used to predict the comprehensive evaluation value. Considering the ultimate goal of sustainable development, a comprehensive evaluation model on operating efficiency of electricity retail companies based on the improved TOPSIS method and LSSVM optimized by modified ant colony algorithm is proposed in this paper. Firstly, from the view of sustainable development, an operating efficiency evaluation indicator system is constructed. Secondly, the entropy weight method is applied to empower the indicators objectively. After that, based on the improved TOPSIS method, the reverse problem in the evaluation process is eliminated. According to the relative proximity between the evaluated objects and the absolute ideal solutions, the scores of comprehensive evaluation for operating efficiency can then be ranked. Finally, the LSSVM optimized by modified ant colony algorithm is introduced to realize the simplified expert scoring process and fast calculation in the comprehensive evaluation process, and its improved learning and generalization ability can be used in the comprehensive evaluation of similar projects. The example analysis proves

  18. Productivity, pricing policy and investments in French and British nationalized electric companies

    International Nuclear Information System (INIS)

    Chick, Martin; Huret, Romain

    2003-01-01

    This is a comparative study of the development of, and interaction between, pricing, investment and productivity in the nationalised electricity industries in the United Kingdom and France between 1945 and 1973. The paper concentrates on examining why the rate of diffusion of marginal approaches to pricing and investment was faster in France than in the UK, although it notes that, in theory at least, the coverage of marginalist ideas was greater in the UK than in France by the late 1960's. The paper highlights the influence of French engineers and economists such as Marcel Boiteux and Pierre Masse on the development of applied public economics in the UK, and suggests that the experiences of 1945- 1973 were to have a significant long-term impact on subsequent attitudes towards privatisation and the promotion of competition in the electricity industry in each economy

  19. Alloy development program: contribution of the General Electric Company to the fourth quarterly report

    International Nuclear Information System (INIS)

    1973-01-01

    The purpose of this activity is to provide a sound basis for systematic comparison of alloys that are candidates for structural materials in future LMFBR cores. Information is presented concerning helium analysis of implanted foils; swelling in irradiated commercial alloys; and microstructural changes in irradiated commercial alloys

  20. 77 FR 10950 - Airworthiness Directives; General Electric Company (GE) Turbofan Engines

    Science.gov (United States)

    2012-02-24

    ...- commanded engine IFSD of one or more engines, leading to an emergency or forced landing of the airplane... perform a removal and replacement of the ECU, and that the average labor rate is $85 per work-hour. A... or more engines, leading to an emergency or forced landing of the airplane. (f) Compliance Comply...

  1. 78 FR 45194 - General Electric Company; Analysis of Proposed Agreement Containing Consent Order To Aid Public...

    Science.gov (United States)

    2013-07-26

    ... which it will be used to account for the shape of that engine, the position of the AGB in the engine... difficulties with its component supplier. Avio has the sole design responsibility for the AGB on the... aircraft. While Avio is in the advanced stages of designing this AGB, further development and testing must...

  2. 76 FR 64291 - Airworthiness Directives; General Electric Company (GE) Turbofan Engines

    Science.gov (United States)

    2011-10-18

    ... shop visit, but not later than 5,500 cycles-in-service (CIS) since the last engine shop visit where the... next engine shop visit, but not later than 5,500 cycles-in- service (CIS) since the last engine shop... than a ``CORRECT FLOW'' packing using paragraph 3.A.(1).(b) of the Accomplishment Instructions of SB No...

  3. 77 FR 12444 - Airworthiness Directives; General Electric Company (GE) Turbofan Engines

    Science.gov (United States)

    2012-03-01

    ... not agree with unconditional deferral to the next shop visit as unacceptable cooling flow could affect... acceptable flows determined during an optional borescope inspection. Request To Revise Criteria for Shop... bore cooling flow for a specified number of cycles. We are issuing this AD to prevent an uncontained...

  4. 75 FR 77570 - Airworthiness Directives; General Electric Company CF6 Series Turbofan Engines

    Science.gov (United States)

    2010-12-13

    ...Rulemaking Portal: Go to http://www.regulations.gov and follow the instructions for sending your comments... attaching the side link to the fan frame--front high-pressure compressor case or the bolt attaching the side... haven't received any reports of cracks in the new P/N links. However, due to the similarity in design...

  5. The impact of electricity price changes on industrial prices and the general price level in Korea

    International Nuclear Information System (INIS)

    Lim, Seul-Ye; Yoo, Seung-Hoon

    2013-01-01

    Electricity has played an important role in the economic development of Korea and, thus, has become a critical factor in sustaining the well-being of the Korean people. This study attempts to investigate the impact of electricity price changes on industrial prices and the general price level using input–output (I–O) analysis. To this end, we apply the I–O price model to the 2011 I–O table recently produced by the Bank of Korea, paying particular attention to the electricity sector by considering it as exogenous and then investigating its impacts. The impacts of the electricity price changes on each industrial sector's prices and the general price level are quantitatively derived. For example, the overall impact of a 10% increase in electricity price on the Korean national economy is estimated to be 0.4367%. We also report the results from the model with the electricity sector endogenous and the model with endogenous electricity and labor sectors. This information can be usefully utilized in decision-making regarding price management for electricity. - Highlights: • We investigate the impact of electricity price changes on the Korean economy. • We use the input–output (I–O) analysis specifying the electricity sector as exogenous. • We apply the I–O price model to 2010 I–O table produced by the Bank of Korea. • The impact of a 10% increase in electricity price on the Korean economy is 0.2176%

  6. The paradoxes of patenting at General Electric: Isador Ladoff's journey from Siberian exile to the heart of corporate capitalism.

    Science.gov (United States)

    Miller, David Philip

    2011-12-01

    Isador Ladoff (1857-1918) worked briefly in the General Electric Company Research Laboratory, from 1901 to 1903. Since he was not employed to invent, Ladoff maintained that he, not the company, owned his invention of a new arc lamp electrode, eventually winning his case on appeal in 1911. The conduct and course of this patent litigation are examined in the light of Ladoff's remarkable life as a prisoner of the czar in Siberia before his escape to the United States in 1891 and as a socialist activist and writer thereafter. In showing that Ladoff's socialist principles activated his struggle with GE, the essay brings out the ironies of his defense of individualism against the incipient socialism of the laboratory supposedly espoused by officials of the company. The case is interesting in relation to the shift from the ideology, and the reality, of heroic individual invention to that of corporate invention in U.S. industrial research. That shift in turn was a crucial landmark in the longer history of the place of science in negotiation and contest about the relationship between creativity and intellectual property.

  7. General Lines of Disregard for the Legal Personality on Irregular Dissolution the Company

    Directory of Open Access Journals (Sweden)

    Fábio Augusto Barcelos Moreira Corrêa

    2016-12-01

    Full Text Available This article will analyze the Institute of disregard for the legal personality in situations involving irregular dissolution the limited liability company, in light of the jurisprudence of the Superior Court Tribunal. We highlight the impact that new code of Civil procedure will provide for analysis to safeguard the autonomy of assets of the legal person, as well as the guarantee of due process and of ample defense, directly impacting on business law. The analysis aims to contribute to the understanding of the Institute, and the systematic procedure. Adopting the dialectical methodology and criticism.

  8. Halbach array motor/generators: A novel generalized electric machine

    Energy Technology Data Exchange (ETDEWEB)

    Merritt, B.T.; Post, R.F.; Dreifuerst, G.R.; Bender, D.A. [Lawrence Livermore National Lab., CA (United States)

    1995-02-01

    For many years Klaus Halbach has been investigating novel designs for permanent magnet arrays, using advanced analytical approaches and employing a keen insight into such systems. One of his motivations for this research was to find more efficient means for the utilization of permanent magnets for use in particle accelerators and in the control of particle beams. As a result of his pioneering work, high power free-electron laser systems, such as the ones built at the Lawrence Livermore Laboratory, became feasible, and his arrays have been incorporated into other particle-focusing systems of various types. This paper reports another, quite different, application of Klaus` work, in the design of high power, high efficiency, electric generators and motors. When tested, these motor/generator systems display some rather remarkable properties. Their success derives from the special properties which these arrays, which the authors choose to call {open_quotes}Halbach arrays,{close_quotes} possess.

  9. On the legal nature of electricity supply contracts concluded by electricity companies and power stations generating electricity from renewable energy sources

    International Nuclear Information System (INIS)

    Herrmann, B.J.

    1998-01-01

    Section 2 of the German Act for enhanced use of electricity from renewable energy sources (StEG) defines the obligation to contract but not the contractual obligations, i.e. the conditions of performance of the contract (supply and purchase of electricity and the legal obligations of contractors). The analysis here shows that characterising this mandatory contract required by the act as an agreement of purchase and sale more appropriately describes the legal nature of the contract and the intent of the legislator than other contracts for supply and purchase of electricity, as for instance those concluded by electric utilities and their customers. One specific aspect elaborated by the author is that the StEG does not constitute an obligation to supply on the part of the renewable energy generating power station, so that the power station operator is not obliged to ensure availability of the electricity at any time or in terms of supplies that can be called off by the purchasing utility, whereas the electric utility is obliged by section 2 of the StEG to purchase the contractual amounts from the generating station. (orig./CB) [de

  10. Planning and administration of human resources in Brazilian Electric Power Companies; Planejamento e administracao de recursos humanos nas empresas brasileiras do setor de energia eletrica

    Energy Technology Data Exchange (ETDEWEB)

    Dias, Devanir Vieira

    1985-12-01

    Administration and planning of human resources in Brazilian Companies of Electric Power Sector analyzes the evolution of the concept of business planning. This work explore the specific literature of this theme, giving emphasis in predict methods and human resources development and planning models. Is also presented a case study, realized in 1979, which comprehended 84 % of Brazilian Energy Companies. This study aims to evaluate the results of an implementation of this planning and development models 64 refs., 12 figs., 22 tabs.

  11. The sustainable car company - or the comeback of the electric car

    Energy Technology Data Exchange (ETDEWEB)

    Sticher, Georg; Rizoulis, Dimitrios [The Boston Consulting Group, Muenchen (Germany)

    2008-07-01

    Every day there are article published about the future of propulsion technology. Opinions are diverging: 'We'll sell nothing but hybrids by 2020' says one automotive executive; whereas for another power train executive ''Hybrids are a violation of physics'. The topic has moved beyond specialized automotive magazines and is strongly emotionalized: Hollywood stars appear driving hybrid vehicles and a documentary film charges the automotive industry as guilty for conspiring against and 'killing the electric car'. Those emotional discussions are largely driven by the announcement of many new vehicles powered by hybrid-electric power trains, fuel cells or batteries. The public is overwhelmed by announcements and can hardly tell concept vehicles from production announcements apart. One core aspect of sustainability is the reduction of CO2 emissions and the increase of vehicle efficiency. The electrification of the vehicle will have to be an integral part of every OEMs and suppliers' portfolio. But without adequate incentives of consumers to purchase the cars and of utilities and/or private investors to provide the necessary infrastructure, the emergence of the electric vehicle may be off to another false start. We do want to offer a structured, multi-stakeholder view in an attempt to de-mystify this rather complex topic. To this, we will present facts on what drives the need for change in the propulsion systems market, what are the viable technological options, what market scenario is likely for 2020 and what does this entail for the major stakeholders. (orig.)

  12. Energy from sugarcane bagasse under electricity rationing in Brazil: a computable general equilibrium model

    International Nuclear Information System (INIS)

    Scaramucci, Jose A.; Perin, Clovis; Pulino, Petronio; Bordoni, Orlando F.J.G.; Cunha, Marcelo P. da; Cortez, Luis A.B.

    2006-01-01

    In the midst of the institutional reforms of the Brazilian electric sectors initiated in the 1990s, a serious electricity shortage crisis developed in 2001. As an alternative to blackout, the government instituted an emergency plan aimed at reducing electricity consumption. From June 2001 to February 2002, Brazilians were compelled to curtail electricity use by 20%. Since the late 1990s, but especially after the electricity crisis, energy policy in Brazil has been directed towards increasing thermoelectricity supply and promoting further gains in energy conservation. Two main issues are addressed here. Firstly, we estimate the economic impacts of constraining the supply of electric energy in Brazil. Secondly, we investigate the possible penetration of electricity generated from sugarcane bagasse. A computable general equilibrium (CGE) model is used. The traditional sector of electricity and the remainder of the economy are characterized by a stylized top-down representation as nested CES (constant elasticity of substitution) production functions. The electricity production from sugarcane bagasse is described through a bottom-up activity analysis, with a detailed representation of the required inputs based on engineering studies. The model constructed is used to study the effects of the electricity shortage in the preexisting sector through prices, production and income changes. It is shown that installing capacity to generate electricity surpluses by the sugarcane agroindustrial system could ease the economic impacts of an electric energy shortage crisis on the gross domestic product (GDP)

  13. ALARA cost/benefit analysis at Union Electric company using the ARP/AI methodology

    International Nuclear Information System (INIS)

    Williams, M.C.

    1987-01-01

    This paper describes the development of a specific method for justification of expenditures associated with reducing occupational radiation exposure to as low as reasonably achievable (ALARA). This methodology is based on the concepts of the Apparebt Reduction Potential (ARP) and Achievability index (AI) as described in NUREG/CR-0446, Union Eletric's corporate planning model and the EPRI Model for dose rate buildup with reactor operating life. The ARP provides a screening test to determine if there is a need for ALARA expenditures based on actual or predicted exposure rates and/or dose experience. The AI is a means of assessing all costs and all benefits, even though they are expressed in different units of measurement such as person-rem and dollars, to determine if ALARA expenditures are justified and their value. This method of cost/benefit analysis can be applied by any company or organization utilizing site-specific exposure and dose rate data, and incorporating consideration of administrative exposure controls which may vary from organization to organization. Specific example cases are presented and compared to other methodologies for ALARA cost/benefit analysis

  14. Does weather explain cost and quality performance? An analysis of UK electricity distribution companies

    International Nuclear Information System (INIS)

    Yu, William; Jamasb, Tooraj; Pollitt, Michael

    2009-01-01

    In recent years, a number of empirical studies and energy regulators have applied benchmarking techniques to measuring the efficiency and performance of network utilities. An important issue has been the extent to which the results are influenced by contextual factors. Among these, weather factors are frequently discussed as being important. We use factor analysis and two-stage data envelopment analysis techniques to examine the effect of a set of important weather factors (gale, hail, temperatures, rainfall and thunder) on the performance of electricity distribution networks in the UK. The results indicate that such factors often do not have a significant economic and statistical effect on the overall performance of the utilities. The weather parameters in some models are significant in terms of economic efficiency. The results echo our previous findings of the importance of extending the basic model to include other inputs such as total expenditure (Totex), customer minutes lost (CML) and network energy losses in regulatory benchmarking.

  15. Basic guidelines to introduce electric circuit simulation software in a general physics course

    Science.gov (United States)

    Moya, A. A.

    2018-05-01

    The introduction of electric circuit simulation software for undergraduate students in a general physics course is proposed in order to contribute to the constructive learning of electric circuit theory. This work focuses on the lab exercises based on dc, transient and ac analysis in electric circuits found in introductory physics courses, and shows how students can use the simulation software to do simple activities associated with a lab exercise itself and with related topics. By introducing electric circuit simulation programs in a general physics course as a brief activitiy complementing lab exercise, students develop basic skills in using simulation software, improve their knowledge on the topology of electric circuits and perceive that the technology contributes to their learning, all without reducing the time spent on the actual content of the course.

  16. Optimization of portfolio of contracts for companies of electric power generation

    International Nuclear Information System (INIS)

    Gunn, Laura Keiko; Silva, Elisa Bastos; Correia, Paulo de Barros

    2010-01-01

    Portfolio optimization is a technique widely used to select investments in economic and financial zones. In the Brazilian Electric Market the portfolio models must consider not only different types of contracts used in the free market, but also different types of markets: the free market, the captive market and the spot market. Normally, the question is knowing which proportion of energy should be sold in each market, in order to maximize the return and minimize the risk. This article deals with a problem from the point of view of a power generator, where their objective is to maximize its profit, to serve their obligations regarding the delivery of energy and minimizing the risk associated with the occurrence of Spot Price - minimum (Spot Price). It is considered that the generator has flexible contracts and inflexible contracts to sell the energy. Inflexible contracts have delivery obligations of fixed energy and flexible contracts allow, the holder of the flexibility, to deliver or to receive an amount of variable energy. In this case, the holder of flexibility may be the purchaser or the generator. (author)

  17. Outages of electric power supply resulting from cable failures Boston Edison Company system

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-07-01

    Factual data are provided regarding 5 electric power supply interruptions that occurred in the Boston Metropolitan area during April to June, 1979. Common to all of these outages was the failure of an underground cable as the initiating event, followed by multiple equipment failures. There was significant variation in the voltage ratings and types of cables which failed. The investigation was unable to delineate a single specific Boston Edison design operating or maintenance practice that could be cited as the cause of the outages. After reviewing the investigative report the following actions were recommended: the development and implementation of a plan to eliminate the direct current cable network; develop a network outage restoration plan; regroup primary feeder cables wherever possible to minimize the number of circuits in manholes, and to separate feeders to high load density areas; develop a program to detect incipient cable faults; evaluate the separation of the north and south sections of Back Bay network into separate networks; and, as a minimum, install the necessary facilities to make it possible to re-energize one section without interfering with the other; and re-evaluate the cathodic protection scheme where necessary. (LCL)

  18. The DuPont, Monsanto, General Electric open-quotes Lasagnaclose quotes Remediation Project - joint R ampersand D and financing

    International Nuclear Information System (INIS)

    Palmer, P.A.

    1995-01-01

    The Lasagna project is the first of what we expect will be several large cooperative projects between industry consortia and government to develop improved remediation technologies. In 1992, Monsanto Company began contacting other major corporations to see if they were experiencing similar difficulties in applying cost-effective, or even workable technologies for industrial site remediation. Both General Electric and DuPont were early participants in the effort to develop a meeting with the EPA to discuss technical problems faced in cleanup, research needs, and ways to accelerate development of more cost-effective techniques. This paper provides some background on how this cooperative process came to reality, what the Lasagna process is and how the cooperative arrangements and financing are structured

  19. Analytic Hierarchy Process-Based Analysis to Determine the Barriers to Implementing a Material Efficiency Strategy: Electrical and Electronics’ Companies in the Malaysian Context

    Directory of Open Access Journals (Sweden)

    Fu Haw Ho

    2016-10-01

    Full Text Available Material efficiency is one of the most important strategies for helping manufacturing companies achieve sustainability in their production activities. However, there are many barriers to the implementation of material efficiency strategies in the manufacturing processes and overall business operations. The aim of this study is to identify and evaluate the barriers faced by Electrical and Electronics (E&E manufacturing companies in Malaysia in implementing material efficiency strategies. A mixed-mode research method was employed to collect data from these companies. Semi-structured interviews were used to identify the barriers faced by the Malaysian Electrical and Electronics (E&E industry, while an Analytic Hierarchy Process (AHP survey was utilized to determine the importance of each barrier. Seven companies participated in the semi-structured interviews, and 18 companies took part in the AHP survey. Nine barriers were generated from analysis of the interviews, and were then ranked by priority using the AHP method. These important findings could be used as a guide for E&E companies in managing or overcoming barriers during the implementation of material efficiency strategies and other sustainable manufacturing activities.

  20. Inquiry relating to modification of reactor installation of Hamaoka No. 2 nuclear power plant of Chubu Electric Power Company, Inc

    International Nuclear Information System (INIS)

    1979-01-01

    Application was made to the Minister of International Trade and Industry for the license relating to the modification of reactor installation of the Hamaoka No. 2 nuclear power plant, Chubu Electric Power Company, Inc., on February 8, 1979, from the president of the company. After the safety evaluation in the Ministry of International Trade and Industry was finished, inquiry was conducted to the head of the Atomic Energy Safety Commission (AESC) on May 25, 1979, from the Minister of International Trade and Industry. The investigation and discussion were commenced by the AESC on May 28, 1979. The modification of the reactor installation is the increase of spent fuel storage capacity from about 220% of in-core fuel at present to about 325%. The fundamental philosophy of the safety evaluation includes the following items; 1) the storage capacity of spent fuel is adequate, 2) the design is such that the criticality is prevented under any assumed condition, 3) the sufficient cooling capacity is kept for decay heat removal, 4) and others required for the safety. The contents of the safety examination for each philosophical item written above are presented. The increased spent fuel storage capacity is equivalent to the quantity produced in about eight years. The prevention of criticality in the spent fuel storage is carefully practiced by putting fuel assemblies in the stainless steel racks with large neutron absorption cross section and locating spent fuel assemblies at the proper distances. The effective multiplication factor is less than 0.95 at the most severe arrangement in the fuel pool. The water temperature in the pool is less than 65 deg C at about 325% core storage by operating the spent fuel pool water cooling system. The spent fuel storage racks are designed as the A class aseismatic structure. (Nakai, Y.)

  1. The new tariff model based on marginal costs developing concept for Brazilian electric sector. A case study for Power and Light Company of Sao Paulo State (Brazil)

    International Nuclear Information System (INIS)

    Correia, S.P.S.

    1991-01-01

    A new methodology for power generation cost accounts in Brazilian electric sector is described, with the application of marginal costs theory and its deviation in developing economies. A case report from a Brazilian Power and Light Company is studied, focalizing the seasoning, the planning, the tariff model and the power generation, transmission and distribution. (M.V.M.). 19 refs, 28 figs, 1 tab

  2. General solution for calculating polarization electric fields in the auroral ionosphere and application examples

    Science.gov (United States)

    Amm, O.; Fujii, R.; VanhamäKi, H.; Yoshikawa, A.; Ieda, A.

    2013-05-01

    We devise an approach to calculate the polarization electric field in the ionosphere, when the ionospheric conductances, the primary (modeled) or the total (measured) electric field, and the Cowling efficiency are given. In contrast to previous studies, our approach is a general solution which is not limited to specific geometrical setups, and all parameters may have any kind of spatial dependence. The solution technique is based on spherical elementary current (vector) systems (SECS). This way, we avoid the need to specify explicit boundary conditions for the searched polarization electric field of its potential which would be required if the problem was solved in a differential equation approach. Instead, we solve an algebraic matrix equation, and the implicit boundary condition that the divergence of the polarization electric field vanishes outside our analysis area is sufficient. In order to illustrate our theory, we then apply it to two simple models of auroral electrodynamic situations, the first being a mesoscale strong conductance enhancement in the early morning sector within a relatively weak southward primary electric field, and a morning sector auroral arc with only a weak conductance enhancement, but a large southward primary electric field at the poleward flank of the arc. While the significance of the polarization electric field for maximum Cowling efficiency is large for the first case, it is rather minor for the second one. Both models show that the polarization electric field effect may not only change the magnitude of the current systems but also their overall geometry. Furthermore, the polarization electric field may extend into regions where the primary electric field is small, thus even dominating the total electric field in these regions. For the first model case, the total Joule heating integrated over the analysis area decreases by a factor of about 4 for maximum Cowling efficiency as compared to the case of vanishing Cowling efficiency

  3. Potential Use of Communications and Project Management Systems in Remote Construction Projects: The Case of Saudi Electric Company

    Directory of Open Access Journals (Sweden)

    Bhzad Sidawi

    2012-01-01

    Full Text Available Remote projects have their unique problems that are caused mainly by the remoteness of the project itself thus the loose control over management. This is due to a number of reasons such as lack of human resources and infrastructure. Research studies that were undertaken worldwide - regarding this issue- has highlighted few unique management problems. The aim of this paper is to investigate how far the IT tools would help in managing remote construction projects in the Kingdom of Saudi Arabia (KSA. Due to the lack of previous research regarding remote projects within the Gulf region and the KSA, a pilot study was conducted in 2009 to define and test the wording of questions that are part of the main survey. The main survey was undertaken on Saudi Electric Company (SEC. The study found that IT systems and tools have the potential but this potential is hindered by a number of technical, managerial, staff factors. Therefore, successful application of IT systems would require changes to the present management settings at various levels. This would ensure that the SEC is capable of achieving the full benefit from using these advanced systems.

  4. Report from investigation committee on the accident at the Fukushima Nuclear Power Stations of Tokyo Electric Power Company

    International Nuclear Information System (INIS)

    Koshizuka, Seiichi

    2012-01-01

    Government's Investigation Committee on the Accident at Fukushima Nuclear Power Stations of Tokyo Electric Power Company published its final report on July 23, 2012. Results of investigation combined final report and interim report published on December 26, 2011. The author was head of accident accuse investigation team mostly in charge of site response, prior measure and plant behavior. This article reported author related technical investigation results focusing on site response and prior measures against tsunamis of units 1-3 of Fukushima Nuclear Power Stations. Misunderstanding of working state of isolation condenser of unit 1, unsuitability of alternative water injection at manual stop of high-pressure coolant injection (HPCI) system of unit 3 and improper prior measure against tsunami and severe accident were pointed out in interim report. Improper monitoring of suppression chamber of unit 2 and again unsuitable work for HPCI system of unit 3 were reported in final report. Thorough technical investigation was more encouraged to update safety measures of nuclear power stations. (T. Tanaka)

  5. Security-constrained self-scheduling of generation companies in day-ahead electricity markets considering financial risk

    International Nuclear Information System (INIS)

    Amjady, Nima; Vahidinasab, Vahid

    2013-01-01

    Highlights: ► A security-constrained self-scheduling is presented. ► The proposed framework takes into account the uncertainty of the predicted market prices. ► We model the risk and profit tradeoff of a GENCO based on an efficient multi-objective model. ► Unit commitment and inter-temporal constraints of generators are considered in an MIP model. ► Simulation results are presented on the IEEE 30-bus and IEEE 118-bus test systems. - Abstract: In this paper, a new security-constrained self-scheduling framework incorporating the transmission flow limits in both steady state conditions and post-contingent states is presented to produce efficient bidding strategy for generation companies (GENCOs) in day-ahead electricity markets. Moreover, the proposed framework takes into account the uncertainty of the predicted market prices and models the risk and profit tradeoff of a GENCO based on an efficient multi-objective model. Furthermore, unit commitment and inter-temporal constraints of generators are considered in the suggested model converting it to a mixed-integer programming (MIP) optimization problem. Sensitivity of the proposed framework with respect to both the level of the market prices and adopted risk level is also evaluated in the paper. Simulation results are presented on the IEEE 30-bus and IEEE 118-bus test systems illustrating the performance of the proposed self-scheduling model.

  6. Role Of E-Government In Delivery Of Public Services In Tanzania Electric Supply Company In Ruvuma Region Tanzania

    Directory of Open Access Journals (Sweden)

    Emmanuel Jackson Petro Gunda

    2015-06-01

    Full Text Available ABSTRACT E-government facilitates delivery of public services of relevant government information in electronic form to citizens in a timely manner and better service delivery to citizens. E-government is a kind of governmental administration which is based on Information Communication and Technology Services. Electronic government describes the use of technologies to facilitate the operation of government and disperse of government information and services. The scope of the work was limited to Tanzania Electric Supply Company Limited TANESCO in Ruvuma region. The population of thirty 31 were selected from a total population of 169 public servants use both purposive and stratified random sampling techniques applied. The major findings of study revealed that about 67.7 of response from respondents agree that ICT infrastructures specifically modern computer connected to internet reliable internet speed well organized organization website power availability in public operation contribute to efficient in delivery of services it also noted by respondents to faster decision making speeding up transaction processing and reduce cost. The study greatly recommends that capacity building to public servants on ICT install and strengthening ICT infrastructures to government organizational are inevitable to realise relevant role of e-government in delivery of public services.

  7. 78 FR 32278 - Vogtle Electric Generating Station, Units 3 and 4; Southern Nuclear Operating Company; Change to...

    Science.gov (United States)

    2013-05-29

    ... Generating Station, Units 3 and 4; Southern Nuclear Operating Company; Change to Information in Tier 1, Table... Nuclear Operating Company, Inc., and Georgia Power Company, Oglethorpe Power Corporation, Municipal... Table 3.3-1, ``Definition of Wall Thicknesses for Nuclear Island Buildings, Turbine Buildings, and Annex...

  8. Standard Technical Specifications for General Electric Boiling Water Reactors (BWR/5)

    International Nuclear Information System (INIS)

    Bottimore, R.R.

    1980-12-01

    The Standard Technical Specifications for General Electric Boiling Water Reactors (GE-STS) is a generic document prepared by the US NRC for use in the licensing process of current General Electric Boiling Water Reactors. The GE-STS sets forth the limits, operating conditions, and other requirements applicable to nuclear reactor facility operation as set forth by Section 50.36 of 10 CFR Part 50 for the protection of the health and safety of the public. The document is revised periodically to reflect current licensing requirements

  9. El Paso Electric Company Diablo Substation to the US-Mexico border 115kV transmission line project. Final Environmental Assessment

    Energy Technology Data Exchange (ETDEWEB)

    1992-04-01

    This Environmental Assessment documents the analysis of alternative corridors for development and operation of a proposed 115 kilovolt transmission line using private lands and transporting power to the US-Mexico international border. The project will require (1) an amendment to El Paso Electric Company`s existing export authorization to transfer power across this border, and (2) a Presidential Permit for construction of the transmission line. The project would be located in Dona Ana county in southern New Mexico, approximately five miles west of El Paso, Texas. The alternative corridors, specific locations within those corridors, and structure types are identified and analyzed in the environmental studies.

  10. Time-of-use rates vs. Hopkinson tariffs redux: an analysis of the choice of rate structures in a regulated electricity distribution company

    International Nuclear Information System (INIS)

    Seeto, Dewey; Woo, C.K.; Horowitz, Ira

    1997-01-01

    Recent proposals to restructure the electricity industry in North America may effect the disintegration of a vertically integrated company into several smaller entities, including distribution companies (DISCOs) We explore whether time-of-use (TOU) pricing or a Hopkinson tariff would be more suitable for a regulated DISCO. Focusing on the economic efficiency of these alternative rate structures, we argue that a Hopkinson tariff with demand subscription is superior to TOU rates, as it can better handle the limited load diversity of local transmission and distribution (TD) demands made on the contemporary DISCO, while finessing the problem of endogenous marginal costs of local TD capacity. (Author)

  11. Results from the Operational Testing of the General Electric Smart Grid Capable Electric Vehicle Supply Equipment (EVSE)

    Energy Technology Data Exchange (ETDEWEB)

    Carlson, Richard Barney [Idaho National Lab. (INL), Idaho Falls, ID (United States); Scoffield, Don [Idaho National Lab. (INL), Idaho Falls, ID (United States); Bennett, Brion [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2013-12-01

    The Idaho National Laboratory conducted testing and analysis of the General Electric (GE) smart grid capable electric vehicle supply equipment (EVSE), which was a deliverable from GE for the U.S. Department of Energy FOA-554. The Idaho National Laboratory has extensive knowledge and experience in testing advanced conductive and wireless charging systems though INL’s support of the U.S. Department of Energy’s Advanced Vehicle Testing Activity. This document details the findings from the EVSE operational testing conducted at the Idaho National Laboratory on the GE smart grid capable EVSE. The testing conducted on the EVSE included energy efficiency testing, SAE J1772 functionality testing, abnormal conditions testing, and charging of a plug-in vehicle.

  12. General method for calculating polarization electric fields produced by auroral Cowling mechanism and application examples

    Science.gov (United States)

    Vanhamäki, Heikki; Amm, Olaf; Fujii, Ryo; Yoshikawa, Aki; Ieda, Aki

    2013-04-01

    The Cowling mechanism is characterized by the generation of polarization space charges in the ionosphere in consequence of a partial or total blockage of FAC flowing between the ionosphere and the magnetosphere. Thus a secondary polarization electric field builds up in the ionosphere, which guarantees that the whole (primary + secondary) ionospheric current system is again in balance with the FAC. In the Earth's ionosphere the Cowling mechanism is long known to operate in the equatorial electrojet, and several studies indicate that it is important also in auroral current systems. We present a general method for calculate the secondary polarization electric field, when the ionospheric conductances, the primary (modeled) or the total (measured) electric field, and the Cowling efficiency are given. Here the Cowling efficiency is defined as the fraction of the divergent Hall current canceled by secondary Pedersen current. In contrast to previous studies, our approach is a general solution which is not limited to specific geometrical setups (like an auroral arc), and all parameters may have any kind of spatial dependence. The solution technique is based on spherical elementary current (vector) systems (SECS). This way, we avoid the need to specify explicit boundary conditions for the searched polarization electric field or its potential, which would be required if the problem was solved in a differential equation approach. Instead, we solve an algebraic matrix equation, for which the implicit boundary condition that the divergence of the polarization electric field vanishes outside our analysis area is sufficient. In order to illustrate the effect of Cowling mechanism on ionospheric current systems, we apply our method to two simple models of auroral electrodynamic situations: 1) a mesoscale strong conductance enhancement in the early morning sector within a relatively weak southward primary electric field, 2) a morning sector auroral arc with only a weak conductance

  13. Installation modification of the reactor No.2 of Ikata nuclear power plant of Shikoku Electric Power Company, Inc

    International Nuclear Information System (INIS)

    1980-01-01

    The application was made on August 25, 1979, from the president of the Shikoku Electric Power Company, Inc., to the Minister of International Trade and Industry, relating to the installation modification of the reactor No. 2 in the Ikata nuclear power plant. The inquiry was submitted on September 28, 1979, from the Minister of International Trade and Industry to the Nuclear Safety Commission, after the safety evaluation in the Ministry of International Trade and Industry, and the investigation and deliberation were started on October 1, 1979, in the Nuclear Safety Commission. The content of the modification is to add the circuit actuated by the abnormal low pressure signal of the reactor to the actuating circuit of the emergency core cooling system (ECCS) and to increase the new fuel storage capacity from about 1/3 core to about 2/3 core. The additional signal circuit is composed of the logic circuit of ''2 out of 4'' and is multichannel design. The circuit is independent from the reactor control system and the conventional signal circuit of the concurrence of low pressure in the reactor and low level in the pressurizer. With the addition of the circuit of abnormal low pressure signal of the reactor, the countermeasures for preventing ECCS start by mistake are also added. These modifications give no influence to the functions of the reactor control system and reactor protection system. The function and the performance of ECCS were analyzed and evaluated accompanying these modifications assuming the loss of coolant accident. Concerning the new fuel storage capacity, the type of racks is modified from angle type to can type, and the subcriticality is kept even at the time of water flood. (Nakai, Y.)

  14. Working conditions and psychosocial risk factors of employees in French electricity and gas company customer support departments.

    Science.gov (United States)

    Chevalier, Anne; Dessery, Michel; Boursier, Marie-Françoise; Grizon, Marie Catherine; Jayet, Christian; Reymond, Catherine; Thiebot, Michelle; Zeme-Ramirez, Monique; Calvez, Thierry

    2011-01-01

    Little is known about the real impact of working conditions on the health of call center employees. The aim of this article is to describe the working conditions of French electricity and gas company customer service teams, especially those spending more than 75% of their working time handling calls in order to determine their subjective experience of their work and identify situations at risk of psychosocial constraints. A cross-sectional study using a self-completion questionnaire was conducted on a representative sample of 2,000 employees working in customer service centers. The questions focused on the variety of tasks performed, the organization of working time, the physical environment of the workstation, violent situations and psychosocial factors (Job Content Questionnaire). Multivariate statistical analyses were performed to identify factors associated with the wish to leave the sector and with a high level of psychosocial constraints. Women made up 66% of the sample. Despite a high educational level, the average socio-professional level of the employees was relatively low. Although the vast majority of employees had chosen this career (74%), just over half would like to leave. The main factors associated with iso-strain were inadequate breaks (odds ratio (OR) = 2.0), low perceived quality of work (OR = 2.4), high proportion of working time spent handling calls (≥75% of working time: OR = 5.9, between 50 and Employees who spend more than 75% of their working time on the phone cumulate every factor linked with a high level of constraints, but all employees of the EDF and Gaz de France customer service centers are concerned. These workers share many characteristics with other call centers: predominantly female workforce; high educational level; wish to leave this sector despite the initial choice; high level of psychosocial risk factors.

  15. Situations of decontamination promotion activities. Efforts by Tokyo Electric Power Company, Fukushima Revitalization Headquarters, Decontamination Promotion Office

    International Nuclear Information System (INIS)

    Takano, Takahiko; Ito, Kei; Takizawa, Koichi

    2015-01-01

    As for the decontamination of the soil contaminated with radioactive materials, decontamination is on the way in compliance with the 'Act on Special Measures Concerning the Handling of Environmental Pollution by Radioactive Materials by the NPS Accident Associated with the Tohoku District - Off the Pacific Ocean' (hereinafter, the Act on Special Measures). Tokyo Electric Power Company (TEPCO), as the party concerned to the accident, is cooperating with decontamination activities conducted by countries and municipalities under the Act on Special Measures. Total number of people cooperated by the Decontamination Promotion Office amounts to about 120,000 people. The cooperation to the decontamination by countries and municipalities covers the following fields: provision of knowledge of radiation, training of site management and supervisors, and proposal such as the decontamination method suitable for the site. As cooperation to various monitoring, there is a traveling monitoring that performs radiation measurement from the vehicles. As cooperation in the farming and industrial resumption toward the reconstruction, the group has implemented support for the distribution promotion of the holdup that was stuck in distribution due to contamination with radioactive substances. As decontamination related technology, the following are performed: (1) preparation of radiation understanding promotion tool, (2) development of precise individual dose measurement technology, and (3) development and utilization of decontamination effect analysis program. In the future, this group will perform the follow-up for decontamination, and measures toward the lifting of evacuation order. It will install the basis to perform various technical analyses on decontamination, and will further intensify technical cooperation. (A.O.)

  16. Magnetohydrodynamic flow of generalized Maxwell fluids in a rectangular micropump under an AC electric field

    Energy Technology Data Exchange (ETDEWEB)

    Zhao, Guangpu [School of Mathematical Science, Inner Mongolia University, Hohhot, Inner Mongolia 010021 (China); Jian, Yongjun, E-mail: jianyj@imu.edu.cn [School of Mathematical Science, Inner Mongolia University, Hohhot, Inner Mongolia 010021 (China); Chang, Long [School of Mathematics and Statistics, Inner Mongolia University of Finance and Economics, Hohhot, Inner Mongolia 010051 (China); Buren, Mandula [School of Mathematical Science, Inner Mongolia University, Hohhot, Inner Mongolia 010021 (China)

    2015-08-01

    By using the method of separation of variables, an analytical solution for the magnetohydrodynamic (MHD) flow of the generalized Maxwell fluids under AC electric field through a two-dimensional rectangular micropump is reduced. By the numerical computation, the variations of velocity profiles with the electrical oscillating Reynolds number Re, the Hartmann number Ha, the dimensionless relaxation time De are studied graphically. Further, the comparison with available experimental data and relevant researches is presented. - Highlights: • MHD flow of the generalized Maxwell fluids under AC electric field is analyzed. • The MHD flow is confined to a two-dimensional rectangular micropump. • Analytical solution is obtained by using the method of separation of variables. • The influences of related parameters on the MHD velocity are discussed.

  17. Magnetohydrodynamic flow of generalized Maxwell fluids in a rectangular micropump under an AC electric field

    International Nuclear Information System (INIS)

    Zhao, Guangpu; Jian, Yongjun; Chang, Long; Buren, Mandula

    2015-01-01

    By using the method of separation of variables, an analytical solution for the magnetohydrodynamic (MHD) flow of the generalized Maxwell fluids under AC electric field through a two-dimensional rectangular micropump is reduced. By the numerical computation, the variations of velocity profiles with the electrical oscillating Reynolds number Re, the Hartmann number Ha, the dimensionless relaxation time De are studied graphically. Further, the comparison with available experimental data and relevant researches is presented. - Highlights: • MHD flow of the generalized Maxwell fluids under AC electric field is analyzed. • The MHD flow is confined to a two-dimensional rectangular micropump. • Analytical solution is obtained by using the method of separation of variables. • The influences of related parameters on the MHD velocity are discussed

  18. Hazardous Waste Cleanup: Caribe General Electric Product in Rio Piedras, Puerto Rico

    Science.gov (United States)

    The Caribe General Electric Product facility (GE Río Piedras) covers approximately 4 acres and is situated on the northern coastal plain in a relatively flat industrial/urban area of Río Piedras with an elevation between 20 and 40 feet above mean sea leve

  19. Computational simulation and lean thinking as tools of process management: an assessment of different alternatives to increase capacity in a manufacturing company of aluminum electrical cables

    Directory of Open Access Journals (Sweden)

    Tiago Augusto Amarante de Souza

    2014-12-01

    Full Text Available In this study, the production chain of a manufacturing company of aluminum electrical conductors is analyzed, in order to select the best strategy for increasing its production capacity. The company´s production systems and flows are highly complex and have high variability in their production flows. A quantitative modeling methodology was proposed to simulate those systems, and to analyze them in a simpler manner. The simulation model considered two different strategies related to production increase: “Lean Thinking” and Machinery/Equipment Purchase. From the current context and the results obtained from the simulation study, it was possible to conclude that the best scenario for increasing production capacity for the company was using the Lean Thinking strategy on the critical processes.The gains in capacity are higher and the implementing costs involved are lower than the ones observed in the other strategy considered.

  20. Analysis of rationality and efficiency of electricity utilization in posture poultry companies by computation platform based in fuzzy system; Analise da racionalidade e eficiencia da utilizacao de energia eletrica em empresas de avicultura de postura via plataforma computacional baseada em sistema fuzzy

    Energy Technology Data Exchange (ETDEWEB)

    Cremasco, Camila Pires [Universidade Estadual Paulista Julio de Mesquita Filho (UNESP), Botucatu, SP (Brazil). Dept. de Bioestatistica; Faculdade de Tecnologia (FATEC), Presidente Prudente, SP (Brazil); Gabriel Filho, Luis Roberto Almeida [Universidade Estadual Paulista Julio de Mesquita Filho (UNESP), Tupa, SP (Brazil). Fac. de Ciencias Agronomicas; Viais Neto, Daniel dos Santos; Bordin, Deyver [Faculdade de Tecnologia (FATEC), Presidente Prudente, SP (Brazil); Silva, Helenice de Oliveira Florentino [Universidade Estadual Paulista Julio de Mesquita Filho (UNESP), Botucatu, SP (Brazil). Dept. de Bioestatistica], E-mails: gabrielfilho@tupa.unesp.br., dvneto@fatecpp.edu.br, bordin@yahoo.com.br, helenice@ibb.unesp.br

    2012-11-01

    A great application of intelligent systems is in control of the electric power consumption of enterprises. For the assessment of the way that the company uses the electricity there are two indices which are called load factor and power factor. To facilitate the assessment of the performance of electric power consumption by the companies it is interesting that there is a single index indicating globally as energy is being used by the same. The goal of this work was to develop a software to assist laying poultry companies in the region of Bastos in more rational and efficient use of electric energy. For this, a system has been developed called Fuzzy Energy integrated environment developed with Delphi 2010. For the determination of fuzzy factor (situation of the company), we used a fuzzy system prepared in advance. The data collected over a period of 3 years helped the system programming. The software was able to present the situation of the company studied in a manner accessible to the user, and their results were tested accuracy 100 according to fuzzy system. With the inference method of Mandani, unable to create a general simulation of all relevant points of enterprise data. (author)

  1. Electrometallurgy company Influence to the Electric Power System of Macedonia and their future participation in the conditions of an open electricity market in Macedonia and the Region

    International Nuclear Information System (INIS)

    Jarmov, Gjorgi; Popovski, Ljubin; Aleksoski, Borko

    2001-01-01

    In this paper the basic characteristics of the electric power consumption in the R. Macedonia for the 2000 year are given. The large electric power consumers are presented, as well as possibilities of their participation in the conditions of an open electricity market in Macedonia and the Region

  2. Electrical Stimulation of the Ventral Tegmental Area Induces Reanimation from General Anesthesia

    Science.gov (United States)

    Solt, Ken; Van Dort, Christa J.; Chemali, Jessica J.; Taylor, Norman E.; Kenny, Jonathan D.; Brown, Emery N.

    2014-01-01

    BACKGROUND Methylphenidate or a D1 dopamine receptor agonist induce reanimation (active emergence) from general anesthesia. We tested whether electrical stimulation of dopaminergic nuclei also induces reanimation from general anesthesia. METHODS In adult rats, a bipolar insulated stainless steel electrode was placed in the ventral tegmental area (VTA, n = 5) or substantia nigra (SN, n = 5). After a minimum 7-day recovery period, the isoflurane dose sufficient to maintain loss of righting was established. Electrical stimulation was initiated and increased in intensity every 3 min to a maximum of 120μA. If stimulation restored the righting reflex, an additional experiment was performed at least 3 days later during continuous propofol anesthesia. Histological analysis was conducted to identify the location of the electrode tip. In separate experiments, stimulation was performed in the prone position during general anesthesia with isoflurane or propofol, and the electroencephalogram was recorded. RESULTS To maintain loss of righting, the dose of isoflurane was 0.9% ± 0.1 vol%, and the target plasma dose of propofol was 4.4 μg/ml ± 1.1 μg/ml (mean ± SD). In all rats with VTA electrodes, electrical stimulation induced a graded arousal response including righting that increased with current intensity. VTA stimulation induced a shift in electroencephalogram peak power from δ (anesthesia with isoflurane or propofol. These results are consistent with the hypothesis that dopamine release by VTA, but not SN, neurons induces reanimation from general anesthesia. PMID:24398816

  3. A general modeling method for I-V characteristics of geometrically and electrically configured photovoltaic arrays

    International Nuclear Information System (INIS)

    Liu Guangyu; Nguang, Sing Kiong; Partridge, Ashton

    2011-01-01

    Highlights: → A novel and general method is proposed for modeling PV arrays or modules. → A robust algorithm is used for the first time to improve the convergence to solution. → Auxiliary functions in other general methods are not compulsory in our method. → It is novel that geometric configuration is also incorporated. → A case study is performed to show the approach's advantages and unique features. - Abstract: A general method for modeling typical photovoltaic (PV) arrays and modules is proposed to find the exact current and voltage relationship of PV arrays or modules of geometrically and electrically different configurations. Nonlinear characteristic equations of electrical devices in solar array or module systems are numerically constructed without adding any virtual electrical components. Then, a robust damped Newton method is used to find exact I-V relationship of these general nonlinear equations, where the convergence is guaranteed. The model can deal with different mismatch effects such as different configurations of bypass diodes, and partial shading. Geometry coordinates of PV components are also considered to facilitate the modeling of the actual physical configuration. Simulation of a PV array with 48 modules, partially shaded by a concrete structure, is performed to verify the effectiveness and advantages of the proposed method.

  4. Descriptive Study of Occupational Accidents and their Causes among Electricity Distribution Company Workers at an Eight-year Period in Iran

    Science.gov (United States)

    Rahmani, Abdolrasoul; Khadem, Monireh; Madreseh, Elham; Aghaei, Habib-Allah; Raei, Mehdi; Karchani, Mohsen

    2013-01-01

    Background Occupational accidents are unplanned events that cause damage. The socio-economic impacts and human costs of accidents are tremendous around the world. Many fatalities happen every year in workplaces such as electricity distribution companies. Some electrical injuries are electrocution, electric shock, and burns. This study was conducted in an electricity distribution company (with rotational 12-hour shift work) in Iran during an 8-year period to survey descriptive factors of injuries. Methods Variables collected included accident time, age of injured worker, employment type, work experience, injury cause, educational background, and other information about accidents. Results Results indicated that most of the accidents occurred in summer, and 51.3% were during shift work. Worker negligence (malpractice) was the cause of 75% of deaths. Type of employment had a significant relationship with type of injuries (p safety was related to job experiences. Temporary workers have no chance to work all year like permanent workers, therefore impressive experiences may be less in them. Because the lack of protective equipment and negligence are main causes of accidents, periodical inspections in workshops are necessary. PMID:24106647

  5. Radiation risk perception by radiation professionals. Survey results just before the radiological accident at the Tokyo Electric Power Company Fukushima Daiichi nuclear power plant

    International Nuclear Information System (INIS)

    Miura, Miwa; Hayashida, Rika; Takao, Hideaki; Matsuda, Naoki; Ono, Koji

    2013-01-01

    From October to December 2010, just before the radiological accident at the Tokyo Electric Power Company Fukushima Daiichi nuclear power plant, 71 radiation professionals belonging to the radiation facilities in Japan were asked what they consider as a 'safe' dose of radiation for themselves, their spouse, parents, children, brothers and friends. Although the 'safe' dose varied widely from less than 1 mSv/y to higher than 100 mSv/y, the average dose was 35.6 mSv/y that was around the middle point between the exposure dose limits for annual average (20 mSv/y) and for any single year (50 mSv/y). Similar results were obtained from another surveys for the members of Japan Radioisotope Association (36.9 mSv/y) and for the Oita Prefectural Hospital (36.8 mSv/y). Among the family members and friends, the minimum average 'safe' dose was 8.5 mSv/y for children, to whom 50% of responders claimed the 'safe' dose less than 1 mSv. Gender, age and specialty of the responder also affected the 'safe' dose. These findings suggest that the perception of radiation risk varies widely and that the legal exposure dose limit derived from the regulatory science may act as an anchor of safety even in radiation professionals. The different level of risk perception for different target groups in radiation professionals appears similar to those in non-professional whole population. The gap between these characteristics of real radiation professionals and the generally accepted picture of radiation professionals might take a part in a state of confusion after the radiological accident. (author)

  6. Choice of models and data availability for the efficiency analysis of the Dutch distribution and supply companies in the electricity sector. Background document of 'Guidelines for price cap regulation in the Dutch electricity sector'

    International Nuclear Information System (INIS)

    Burns, P.; Huggins, M.; Riechmann, C.; Weyman-Jones, T.

    2000-02-01

    July 1999 The Netherlands Electricity Regulatory Service (DtE) published an Information and Consultation Document on the title subject. By means of price cap regulation tariffs are determined such that businesses are stimulated continuously to organize their total processes and operation as efficient as possible. In the consultation document a large number of questions with respect to the future organization and planning of the system of economic regulation of the electricity sector in the Netherlands can be found. Many reactions and answers were received, compiled and analyzed. The results are presented in the main report, which forms the framework for the DtE to shape the economic regulation of the Dutch electricity sector. In this background document attention is paid to the most appropriate models by means of which the efficiency of the electricity companies in the Netherlands can be analyzed

  7. Resolution 148/012. It authorize the 'Central Libertador / SA aeolian generation' company to generate an aeolian electricity source by an electric power generating plant located in Lavalleja town 1 AA catastral section and in Maldonado town 4 AA Catastral section, and the 'Sistema inerconectado Nacional' connection

    International Nuclear Information System (INIS)

    2012-01-01

    This decree authorizes the generation of electricity using aeolian energy as the primary electricity source. This project was presented by the 'Libertador / S.A' aeolian generation company with the proposal to instal an electrical plant in Lavalleja town. This authorization is according to the Electric Wholesale Market regulation

  8. 76 FR 27669 - Penske Logistics LLC, a Subsidiary of General Electric/Penske Corporation Including On-Site...

    Science.gov (United States)

    2011-05-12

    ... DEPARTMENT OF LABOR Employment and Training Administration [TA-W-74,897] Penske Logistics LLC, a Subsidiary of General Electric/Penske Corporation Including On-Site Leased Workers From Kelly Temporary... workers and former workers of Penske Logistics LLC, a subsidiary of General Electric/Penske Corporation...

  9. 77 FR 13367 - General Electric-Hitachi Global Laser Enrichment, LLC, Proposed Laser-Based Uranium Enrichment...

    Science.gov (United States)

    2012-03-06

    ... NUCLEAR REGULATORY COMMISSION [NRC-2009-0157] General Electric-Hitachi Global Laser Enrichment, LLC, Proposed Laser-Based Uranium Enrichment Facility, Wilmington, NC AGENCY: Nuclear Regulatory... Impact Statement (EIS) for the proposed General Electric- Hitachi Global Laser Enrichment, LLC (GLE...

  10. A General Model for Thermal, Hydraulic and Electric Analysis of Superconducting Cables

    CERN Document Server

    Bottura, L; Rosso, C

    2000-01-01

    In this paper we describe a generic, multi-component and multi-channel model for the analysis of superconducting cables. The aim of the model is to treat in a general and consistent manner simultaneous thermal, electric and hydraulic transients in cables. The model is devised for most general situations, but reduces in limiting cases to most common approximations without loss of efficiency. We discuss here the governing equations, and we write them in a matrix form that is well adapted to numerical treatment. We finally demonstrate the model capability by comparison with published experimental data on current distribution in a two-strand cable.

  11. Comparison of the General Electric BWR/6 standard plant design to the IAEA NUSS codes and guides

    International Nuclear Information System (INIS)

    D'Ardenne, W.H.; Sherwood, G.G.

    1985-01-01

    The General Electric BWR/6 Mark III standard plant design meets or exceeds current requirements of published International Atomic Energy Agency (IAEA) Nuclear Safety Standards (NUSS) codes and guides. This conclusion is based on a review of the NUSS codes and guides by General Electric and by the co-ordinated US review of the NUSS codes and guides during their development. General Electric compared the published IAEA NUSS codes and guides with the General Electric design. The applicability of each code and guide to the BWR/6 Mark III standard plant design was determined. Each code or guide was reviewed by a General Electric engineer knowledgeable about the structures, systems and components addressed and the technical area covered by that code or guide. The results of this review show that the BWR/6 Mark III standard plant design meets or exceeds the applicable requirements of the published IAEA NUSS codes and guides. The co-ordinated US review of the IAEA NUSS codes and guides corroborates the General Electric review. In the co-ordinated US review, the USNRC and US industry organizations (including General Electric) review the NUSS codes and guides during their development. This review ensures that the NUSS codes and guides are consistent with the current US government regulations, guidance and regulatory practices, US voluntary industry codes and standards, and accepted US industry design, construction and operational practices. If any inconsistencies are identified, comments are submitted to the IAEA by the USNRC. All US concerns submitted to the IAEA have been resolved. General Electric design reviews and the Final Design Approval (FDA) issued by the USNRC have verified that the General Electric BWR/6 Mark III standard plant design meets or exceeds the current US requirements, guidance and practices. Since these requirements, guidance and practices meet or exceed those of the NUSS codes and guides, so does the General Electric design. (author)

  12. Distributional modeling and short-term forecasting of electricity prices by Generalized Additive Models for Location, Scale and Shape

    International Nuclear Information System (INIS)

    Serinaldi, Francesco

    2011-01-01

    In the context of the liberalized and deregulated electricity markets, price forecasting has become increasingly important for energy company's plans and market strategies. Within the class of the time series models that are used to perform price forecasting, the subclasses of methods based on stochastic time series and causal models commonly provide point forecasts, whereas the corresponding uncertainty is quantified by approximate or simulation-based confidence intervals. Aiming to improve the uncertainty assessment, this study introduces the Generalized Additive Models for Location, Scale and Shape (GAMLSS) to model the dynamically varying distribution of prices. The GAMLSS allow fitting a variety of distributions whose parameters change according to covariates via a number of linear and nonlinear relationships. In this way, price periodicities, trends and abrupt changes characterizing both the position parameter (linked to the expected value of prices), and the scale and shape parameters (related to price volatility, skewness, and kurtosis) can be explicitly incorporated in the model setup. Relying on the past behavior of the prices and exogenous variables, the GAMLSS enable the short-term (one-day ahead) forecast of the entire distribution of prices. The approach was tested on two datasets from the widely studied California Power Exchange (CalPX) market, and the less mature Italian Power Exchange (IPEX). CalPX data allow comparing the GAMLSS forecasting performance with published results obtained by different models. The study points out that the GAMLSS framework can be a flexible alternative to several linear and nonlinear stochastic models. - Research Highlights: ► Generalized Additive Models for Location, Scale and Shape (GAMLSS) are used to model electricity prices' time series. ► GAMLSS provide the entire dynamicaly varying distribution function of prices resorting to a suitable set of covariates that drive the instantaneous values of the parameters

  13. The French Electricity Company (EDF) and the environment. Press file for 1996; EDF et l'environnment 1996. Dossier de presse

    Energy Technology Data Exchange (ETDEWEB)

    Bourdier, Jean-Pierre [Electricite de France (EDF), 75 - Paris (France)

    1997-03-27

    In 1996 the actions of EDF in the domain of environment have recorded FF 4 billions (FF 3.5 billion in 1995), representing about 2% of the EDF's turnover. The EDF keeps on its efforts for reducing the impact of its activities upon environment. Several applications of an environment protective electricity generation are promoted by the company. The company brings services and technical solutions to its clients which meet their energy needs and conserving at the same time the life conditions. Furthermore, EDF participates in the activity of numerous national and international organisms, intervening in the environmental questions, in decision making, participating in studies and actions and following continually the direction of a durable economic and social development. The report is structured in three chapters: 1. an industrial responsibility; 2. services and techniques for environment; 3. action towards a durable development.

  14. The French Electricity Company (EDF) and the environment. Press file for 1996; EDF et l'environnment 1996. Dossier de presse

    Energy Technology Data Exchange (ETDEWEB)

    Bourdier, Jean-Pierre [Electricite de France (EDF), 75 - Paris (France)

    1997-03-27

    In 1996 the actions of EDF in the domain of environment have recorded FF 4 billions (FF 3.5 billion in 1995), representing about 2% of the EDF's turnover. The EDF keeps on its efforts for reducing the impact of its activities upon environment. Several applications of an environment protective electricity generation are promoted by the company. The company brings services and technical solutions to its clients which meet their energy needs and conserving at the same time the life conditions. Furthermore, EDF participates in the activity of numerous national and international organisms, intervening in the environmental questions, in decision making, participating in studies and actions and following continually the direction of a durable economic and social development. The report is structured in three chapters: 1. an industrial responsibility; 2. services and techniques for environment; 3. action towards a durable development.

  15. A general electromagnetic excitation model for electrical machines considering the magnetic saturation and rub impact

    Science.gov (United States)

    Xu, Xueping; Han, Qinkai; Chu, Fulei

    2018-03-01

    The electromagnetic vibration of electrical machines with an eccentric rotor has been extensively investigated. However, magnetic saturation was often neglected. Moreover, the rub impact between the rotor and stator is inevitable when the amplitude of the rotor vibration exceeds the air-gap. This paper aims to propose a general electromagnetic excitation model for electrical machines. First, a general model which takes the magnetic saturation and rub impact into consideration is proposed and validated by the finite element method and reference. The dynamic equations of a Jeffcott rotor system with electromagnetic excitation and mass imbalance are presented. Then, the effects of pole-pair number and rubbing parameters on vibration amplitude are studied and approaches restraining the amplitude are put forward. Finally, the influences of mass eccentricity, resultant magnetomotive force (MMF), stiffness coefficient, damping coefficient, contact stiffness and friction coefficient on the stability of the rotor system are investigated through the Floquet theory, respectively. The amplitude jumping phenomenon is observed in a synchronous generator for different pole-pair numbers. The changes of design parameters can alter the stability states of the rotor system and the range of parameter values forms the zone of stability, which lays helpful suggestions for the design and application of the electrical machines.

  16. New maintenance strategy of Tokyo Electric Power Company and Fukushima Dai-ichi Nuclear Power Plant for effective ageing management and safe long-term operation

    International Nuclear Information System (INIS)

    Inagaki, Takeyuki; Yamashita, Norimichi

    2009-01-01

    Fukushima Dai-ichi Nuclear Power Plant is the oldest among three nuclear power plants owned and operated by Tokyo Electric Power Company, which consists of six boiling water reactor units. The commercial operation of Unit 1 was commenced in 1971 (37 years old) and Unit 6 in 1978 (29 years old). Currently ageing degradations of systems, structures and components are managed through maintenance programs, component replacement/refurbishment programs and long-term maintenance plans. The long-term maintenance plans are established through ageing management component replacement/refurbishment programs reviews performed before the 30th year of operation and they are for safe and reliable operation after 30 years (long-term operation). However the past maintenance actions and past component replacement/refurbishment programs were not always proactive and past operational experience and maintenance practices suggest that effective/proactive ageing management programs be introduced in earlier stage of the plant operation. In this circumstance, Tokyo Electric Power Company and Fukushima Dai-ichi Nuclear Power Plant are setting up a new maintenance strategy that includes 1) improving the normal maintenance programs by using ageing degradation data, 2) effective use of information on internal/external operational experience and maintenance practices related to ageing, and 3) proactive component/equipment refurbishment programs during a refreshment outage for safe and reliable long-term operation. To accomplish the goal of this strategy, strengthening engineering capability of plant staff members is a crucial required for the plant. The objective of this paper is to briefly explain main results ageing management reviews, past and current significant ageing issues and management programs against them, and the new maintenance strategy established by Tokyo Electric Power Company and Fukushima Dai-ichi Nuclear Power Plant. (author)

  17. RichMol: A general variational approach for rovibrational molecular dynamics in external electric fields

    Science.gov (United States)

    Owens, Alec; Yachmenev, Andrey

    2018-03-01

    In this paper, a general variational approach for computing the rovibrational dynamics of polyatomic molecules in the presence of external electric fields is presented. Highly accurate, full-dimensional variational calculations provide a basis of field-free rovibrational states for evaluating the rovibrational matrix elements of high-rank Cartesian tensor operators and for solving the time-dependent Schrödinger equation. The effect of the external electric field is treated as a multipole moment expansion truncated at the second hyperpolarizability interaction term. Our fully numerical and computationally efficient method has been implemented in a new program, RichMol, which can simulate the effects of multiple external fields of arbitrary strength, polarization, pulse shape, and duration. Illustrative calculations of two-color orientation and rotational excitation with an optical centrifuge of NH3 are discussed.

  18. A general circuit model for spintronic devices under electric and magnetic fields

    KAUST Repository

    Alawein, Meshal

    2017-10-25

    In this work, we present a circuit model of diffusive spintronic devices capable of capturing the effects of both electric and magnetic fields. Starting from a modified version of the well-established drift-diffusion equations, we derive general equivalent circuit models of semiconducting/metallic nonmagnets and metallic ferromagnets. In contrast to other models that are based on steady-state transport equations which might also neglect certain effects such as thermal fluctuations, spin dissipation in the ferromagnets, and spin precession under magnetic fields, our model incorporates most of the important physics and is based on a time-dependent formulation. An application of our model is shown through simulations of a nonlocal spin-valve under the presence of a magnetic field, where we reproduce experimental results of electrical measurements that demonstrate the phenomena of spin precession and dephasing (“Hanle effect”).

  19. Auditor´s report of report of companies of the brazilian electrical sector: one study of the normative adherence of the reports emited between 1999 and 2006

    Directory of Open Access Journals (Sweden)

    Marcelo Haendchen Dutra

    2008-07-01

    Full Text Available The purpose of the present study was to verify the adherence to the normative demands found in the auditors’ reports concerned with the companies of the Brazilian electrical sector. To reach the proposed goal, an exploratory-descriptive study of report samples published between 1999 and 2006 was undertaken, covering the financial statements issued from 1998 to 2005, selected from Closing Balance, of Gazeta Mercantil. The research has an descriptive character and used the content analysis technique for the data analysis and interpretation. The approach adopted was both qualitative and quantitative. 136 auditors’ reports were scrutinized through the comparison between paragraphs contained in those reports and the aforementioned auditing standards issued by the regulating organ, the Accounting Federal Board. 936 frequencies were acknowledged, being divided into adherent and non-adherent, and the 14,9% of non-adherent ones were minutely discussed. Key words: Auditors’ Report, Auditing Standards and Electrical Sector.

  20. A generalized transformation to convert an arbitrary perfect electric conductor into another arbitrary dielectric object

    International Nuclear Information System (INIS)

    Huang Lujun; Zhou Daming; Wang Jian; Li Guanhai; Li Zhifeng; Chen Xiaoshuang; Lu Wei

    2011-01-01

    A generalized transformation is proposed to design an illusion device. The device can reshape an arbitrarily shaped perfect electrical conductor (PEC) into another dielectric object with arbitrary geometry. Such a device can evolve into an ideal invisibility cloak with non-conformal boundaries if the virtual space is filled with air. Furthermore, the validity of our proposed transformation is confirmed by two specific devices. One is to convert a regular polygonal PEC cylinder into a circular dielectric cylinder. Another one is to reshape a circular PEC cylinder into a regular polygonal dielectric cylinder.

  1. Confined electron assemblies in intense electric and magnetic fields and a generalization of Emden's equation

    International Nuclear Information System (INIS)

    March, N.H.

    2003-09-01

    The Feynman propagator, and its parallel in statistical mechanics, namely the canonical density matrix, are first used to treat both homogeneous and confined electron assemblies in the presence of a static electric field of arbitrary strength. The models are relevant to plasmas having variable electron density and degeneracy. The second topic concerns atomic ions in intense magnetic fields. Semiclassical theory is here applied, non-relativistic and relativistic approximations being invoked. Both treatments are shown to be embraced by a generalization of Emden's equation. (author)

  2. We let the electricity giants shrink. Anti-nuclear activists can be successful even against the largest companies; Wir lassen die Stromriesen schrumpfen. AtomkraftgegnerInnen koennen sogar gegen die groessten Konzerne erfolgreich sein

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2015-12-15

    In the newsletter the authors discuss the issues economic situation of the large electricity companies in Germany, the governmental energy policy, the ongoing financial support by the government, and the possibility to shutdown all German nuclear power plants without electricity shortcomings.

  3. Generalized Bohm’s criterion and negative anode voltage fall in electric discharges

    Energy Technology Data Exchange (ETDEWEB)

    Londer, Ya. I.; Ul’yanov, K. N., E-mail: kulyanov@vei.ru [Lenin All-Russian Electrotechnical Institute (Russian Federation)

    2013-10-15

    The value of the voltage fall across the anode sheath is found as a function of the current density. Analytic solutions are obtained in a wide range of the ratio of the directed velocity of plasma electrons v{sub 0} to their thermal velocity v{sub T}. It is shown that the voltage fall in a one-dimensional collisionless anode sheath is always negative. At the small values of v{sub 0}/v{sub T}, the obtained expression asymptotically transforms into the Langmuir formula. Generalized Bohm’s criterion for an electric discharge with allowance for the space charge density ρ(0), electric field E(0), ion velocity v{sub i}(0), and ratio v{sub 0}/v{sub T} at the plasma-sheath interface is formulated. It is shown that the minimum value of the ion velocity v{sub i}{sup *}(0) corresponds to the vanishing of the electric field at one point inside the sheath. The dependence of v{sub i}{sup *} (0) on ρ(0), E(0), and v{sub 0}/v{sub T} determines the boundary of the existence domain of stationary solutions in the sheath. Using this criterion, the maximum possible degree of contraction of the electron current at the anode is determined for a short high-current vacuum arc discharge.

  4. Generalized Bohm’s criterion and negative anode voltage fall in electric discharges

    International Nuclear Information System (INIS)

    Londer, Ya. I.; Ul’yanov, K. N.

    2013-01-01

    The value of the voltage fall across the anode sheath is found as a function of the current density. Analytic solutions are obtained in a wide range of the ratio of the directed velocity of plasma electrons v 0 to their thermal velocity v T . It is shown that the voltage fall in a one-dimensional collisionless anode sheath is always negative. At the small values of v 0 /v T , the obtained expression asymptotically transforms into the Langmuir formula. Generalized Bohm’s criterion for an electric discharge with allowance for the space charge density ρ(0), electric field E(0), ion velocity v i (0), and ratio v 0 /v T at the plasma-sheath interface is formulated. It is shown that the minimum value of the ion velocity v i * (0) corresponds to the vanishing of the electric field at one point inside the sheath. The dependence of v i * (0) on ρ(0), E(0), and v 0 /v T determines the boundary of the existence domain of stationary solutions in the sheath. Using this criterion, the maximum possible degree of contraction of the electron current at the anode is determined for a short high-current vacuum arc discharge

  5. Modification of reactor installation in the Takahama nuclear power plants No.1 and No.2 of Kansai Electric Power Company, Inc

    International Nuclear Information System (INIS)

    1979-01-01

    The Nuclear Safety Commission recognized the adequacy concerning the inquiry which was offered from the Minister of International Trade and Industry on July 24, 1979, following the safety evaluation in the Ministry of International Trade and Industry, and decided to submit a report to the Minister of International Trade and Industry on July 26, 1979, about the modification of reactor installation in the Takahama nuclear power plants No. 1 and No. 2 of the Kansai Electric Power Company, Inc. This is concerned to the application which was made from the president of the Kansai Electric Power Company, Inc., to the Minister of International Trade and Industry on July 23, 1979. The content of the modification is to add a control circuit which is actuated by the signal of abnormal low pressure in a reactor to the circuit of actuating the emergency core cooling system of the plant. The influences on the safety protection system by the addition of the circuit for transmitting safety injection signal and by the additions of an interlock circuit preventing the misoperation of pressurizer spray and of a block circuit of safety injection signal in case of the abnormal low pressure in a reactor were evaluated. The effects on the function and characteristics of the emergency core cooling system due to the addition of the control circuit were investigated, and it was recognized by the analysis that there is no effect in the pipe ruptures of both small and large scales. (Nakai, Y.)

  6. A novel Generalized State-Space Averaging (GSSA) model for advanced aircraft electric power systems

    International Nuclear Information System (INIS)

    Ebrahimi, Hadi; El-Kishky, Hassan

    2015-01-01

    Highlights: • A study model is developed for aircraft electric power systems. • A novel GSSA model is developed for the interconnected power grid. • The system’s dynamics are characterized under various conditions. • The averaged results are compared and verified with the actual model. • The obtained measured values are validated with available aircraft standards. - Abstract: The growing complexity of Advanced Aircraft Electric Power Systems (AAEPS) has made conventional state-space averaging models inadequate for systems analysis and characterization. This paper presents a novel Generalized State-Space Averaging (GSSA) model for the system analysis, control and characterization of AAEPS. The primary objective of this paper is to introduce a mathematically elegant and computationally simple model to copy the AAEPS behavior at the critical nodes of the electric grid. Also, to reduce some or all of the drawbacks (complexity, cost, simulation time…, etc) associated with sensor-based monitoring and computer aided design software simulations popularly used for AAEPS characterization. It is shown in this paper that the GSSA approach overcomes the limitations of the conventional state-space averaging method, which fails to predict the behavior of AC signals in a circuit analysis. Unlike conventional averaging method, the GSSA model presented in this paper includes both DC and AC components. This would capture the key dynamic and steady-state characteristics of the aircraft electric systems. The developed model is then examined for the aircraft system’s visualization and accuracy of computation under different loading scenarios. Through several case studies, the applicability and effectiveness of the GSSA method is verified by comparing to the actual real-time simulation model obtained from Powersim 9 (PSIM9) software environment. The simulations results represent voltage, current and load power at the major nodes of the AAEPS. It has been demonstrated that

  7. Inquiry relating to modifications of reactor installation in Ikata No. 1 and 2 nuclear power plants of Shikoku Electric Power Company, Inc

    International Nuclear Information System (INIS)

    1979-01-01

    Application was made to the Minister of International Trade and Industry for the license relating to the modifications of reactor installation in the Ikata No. 1 and 2 nuclear power plants of the Shikoku Electric Power Company, Inc., on February 13, 1979, from the president of the company. After the safety evaluation was finished by the Ministry of International Trade and Industry, inquiry was conducted to the Atomic Energy Safety Commission (AESC) on June 15, 1979, from the Minister of International Trade and Industry. The investigation and discussion were commenced by the AESC on June 19, 1979. The modifications of the reactor installation are the increase of new fuel storage capacity from about 1/3 to about 2/3 of in-core fuel for No. 1 plant and the modification of driving mechanism from the roller nut type to the magnetic jack type for the control rod cluster for adjusting power distribution in the No. 2 plant. The contents of the safety examination for each item written above are presented. The prevention of criticality is carefully practiced for the new fuel storage by putting fuel assemblies in stainless steel can type racks and locating the fuel assemblies at the proper distance. Relating to the driving mechanism for the control rod cluster adjusting power distribution, the driving speed is not modified and the reliability is kept by carrying out the continuous operation test and the electric power black out test as the demonstration test. The magnetic jack type mechanism has the locking device to prevent reactor tripping at the time of electric power black out, and the cluster is held at the location where the cluster existed at the time of black out. (Nakai, Y.)

  8. Safety evaluation report related to the operation of Susquehanna Steam Electric Station, Units 1 and 2. Docket Nos. 50-387 and 50-388, Pennsylvania Power and Light Company and Allegheny Electric Cooperative, Inc

    International Nuclear Information System (INIS)

    1982-11-01

    In April 1981, the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-0776) regarding the application of the Pennsylvania Power and Light Company (the licensee) and the Allegheny Electric Cooperative, Inc. (co-licensee) for licenses to operate the Susquehanna Steam Electric Station, Units 1 and 2, located on a site in Luzerne County, Pennsylvania. Supplement 1, issued in June 1981, addressed outstanding issues. Supplement 2, issued in September 1981, contains the ACRS Report and responses. Supplement 3, issued in July 1982, contains the resolution to five items previously identified as open and closes them out. On July 17, 1982, License NPF-14 was issued to allow Unit 1 operation at power levels not to exceed 5% of rated power. This supplement discusses the resolution of several license conditions that have been met

  9. Results of photovoltaic power generation system operation in Tokyo Electric Power Company; Tokyo Denryoku ni okeru taiyoko hatsuden setsubi no unten jisseki ni tsuite

    Energy Technology Data Exchange (ETDEWEB)

    Fukuda, H; Itokawa, K [Tokyo Electric Power Co. Inc., Tokyo (Japan)

    1996-10-27

    A report was made on the measurement of data and the results of the analysis at 14 sites of photovoltaic power generation facilities operated under system interconnection by Tokyo Electric Power Company. This type of system is provided in 40 sites as of the end of fiscal 1995, generating 479kw. The items measured were the generated electric energy at all 14 sites, and the quantity of solar radiation, outside air temperature, panel temperature, etc., at limited sites; and the capacity of each equipment, azimuth and inclination of the panel were also recorded simultaneously. Hourly values were used for the analysis. Five minute values were utilized, however, in the examination of the cause of lowered output and in the situation recognition of the influence of the shade or the change of weather. The utilization factor of the facilities was in the average 10.8% in fiscal 1994 and 10.7% in fiscal 1995. The factor decreased slightly unless the panel azimuth faced due south. The utilization factor at the panel inclination of 35 degrees and 45 degrees showed both 10.4% through the year making no difference. The system seemed to show no overwhelming possibilities in coping with electric power demand. The reason was that deviation existed for 2 hours or so in the peak and that reliability was low as basic power facilities. However, it was determined that the system be continuously examined in future. 9 figs., 1 tab.

  10. The Analysis of the Reaction of the Romanian Companies Supplying Electrical Energy to the Modification of the Geopolitical Context and of the Internal Legislative Frame

    Directory of Open Access Journals (Sweden)

    Vasile Robu

    2007-12-01

    Full Text Available Supplying services in the electrical energy domain that corresponds qualitatively, at acceptable prices, in the context of the respect of the environment preservation standards and of the security of the supply, in accordance with the demands of the economic growth, represents a main component of the lasting development. In the 9th chapter of the 21st Agenda is stated that “energy is essential to the economic and social development and to a better quality of life”. At global level, given the current technological conditions and the permanent growth of the quantity of resources used, a large part of the energy is produced and consumed in an unsustainable manner. The necessity of controlling the greenhouse gas emissions and of other polluting substances imposes the increase of the efficiency of production, transportation, distribution and consumption of the energy and the growth of the use of renewable energy sources. All energy sources must be used in a manner that permits the respect of the environment on the whole. The operational research executed let us state that the defining elements of the geopolitical context influence the behaviour of the companies supplying electrical energy, which has an effect in any branch of the national economy. Such an approach is useful in the determination of the impact of the increase of electrical energy prices on the vulnerable sectors of the national economy.

  11. Effects of music and art education in early life and oral functions on the QOL of the Takarazuka Revue Company OG compared with general elderly females.

    Science.gov (United States)

    Masutani, Takiko; Yamamoto, Yasuji; Konishi, Junya; Maeda, Kiyoshi

    2010-03-01

    Today, Japan is becoming a super-aged society, with senior citizens already constituting over 21% of the population. In this situation, the question of how elderly people can extend their lives and enjoy independent lifestyles is becoming more important. The present study aims to clarify the relationship between the Quality of Life (QOL) of elderly females and their current oral functions and experiences of music and art education in early life. We carried out a survey study focusing on elderly females (Takarazuka Revue Company OG group and general female group) by carrying out a questionnaire survey and comparing cognitive function, oral examinations, cerebral atrophy in magnetic resonance imaging, and other characteristics. It was shown that the Takarazuka Revue Company OG group had greater hippocampal volumes and significantly higher cognitive functions than the general female group. In addition, in the general female group, there was a significant correlation between a decrease in the number of remaining teeth and a decrease in activities in daily living, but in the Takarazuka Revue Company OG group, no such correlation was observed. The results showed that those who have received art education as part of their careers over an extensive period since early life have higher levels of cognitive function, QOL, physical activity, social activity and life satisfaction compared with the general female group; showing that they sense a purpose in life and live with a positive attitude. In contrast, in the general female group, those who have continued to enjoy hobbies have higher levels of cognitive function, QOL, physical activity, social activity and life satisfaction than those who have not, thus showing that they live with a positive attitude.

  12. Attempt to generalize fractional-order electric elements to complex-order ones

    Science.gov (United States)

    Si, Gangquan; Diao, Lijie; Zhu, Jianwei; Lei, Yuhang; Zhang, Yanbin

    2017-06-01

    The complex derivative {D}α +/- {{j}β }, with α, β \\in R+ is a generalization of the concept of integer derivative, where α=1, β=0. Fractional-order electric elements and circuits are becoming more and more attractive. In this paper, the complex-order electric elements concept is proposed for the first time, and the complex-order elements are modeled and analyzed. Some interesting phenomena are found that the real part of the order affects the phase of output signal, and the imaginary part affects the amplitude for both the complex-order capacitor and complex-order memristor. More interesting is that the complex-order capacitor can do well at the time of fitting electrochemistry impedance spectra. The complex-order memristor is also analyzed. The area inside the hysteresis loops increases with the increasing of the imaginary part of the order and decreases with the increasing of the real part. Some complex case of complex-order memristors hysteresis loops are analyzed at last, whose loop has touching points beyond the origin of the coordinate system.

  13. Simulation of the preliminary General Electric SP-100 space reactor concept using the ATHENA computer code

    International Nuclear Information System (INIS)

    Fletcher, C.D.

    1986-01-01

    The capability to perform thermal-hydraulic analyses of a space reactor using the ATHENA computer code is demonstrated. The fast reactor, liquid-lithium coolant loops, and lithium-filled heat pipes of the preliminary General electric SP-100 design were modeled with ATHENA. Two demonstration transient calculations were performed simulating accident conditions. Calculated results are available for display using the Nuclear Plant Analyzer color graphics analysis tool in addition to traditional plots. ATHENA-calculated results appear reasonable, both for steady state full power conditions, and for the two transients. This analysis represents the first known transient thermal-hydraulic simulation using an integral space reactor system model incorporating heat pipes. 6 refs., 17 figs., 1 tab

  14. Potential criticality accident at the General Electric Nuclear Fuel and Component Manufacturing Facility, May 29, 1991

    International Nuclear Information System (INIS)

    1991-08-01

    At the General Electric Nuclear Fuel and Component Manufacturing facility, located near Wilmington, North Carolina, on May 28 and 29, 1991, approximately 150 kilograms of uranium were inadvertently transferred from safe process tanks to an unsafe tank located at the waste treatment facility, thus creating the potential for a localized criticality safety problem. The excess uranium was ultimately safely recovered when the tank contents were centrifuged to remove the uranium-bearing material. Subsequently, the US Nuclear Regulatory Commission dispatched an Incident Investigation Team to determine what happened, to identify probable causes, and to make appropriate findings and conclusions. This report describes the incident, the methodology used by the team in its investigation, and presents the team's findings and conclusions. 48 figs., 8 tabs

  15. General Equilibrium Analysis of Electricity Market Liberalization in Singapore: A Comparative Study

    Directory of Open Access Journals (Sweden)

    Fenglong XIAO

    2011-12-01

    Full Text Available The liberalization in electricity market in Singapore has being undertaken for more than 15 years. This paper evaluates the influence of competition policies by computable general equilibrium (CGE model. Instead of the direct measurement of the impact of competition policy, the benefit of liberalization is reflected by the simulation of a hypothetical regulatory condition. Comparing to the regulatory scenario, simulation result implies the current liberalization raises GDP and exchange rate significantly, but also leaves the tradeoff between higher national income and lower consumer welfare to government. If such choice of economic policy is necessary for political demand, a formal legal framework is required to enforce the restoration of the economy from regulatory restrictions.

  16. Linear electrical circuits. Definitions - General theorems; Circuits electriques lineaires. Definitions - Theoremes generaux

    Energy Technology Data Exchange (ETDEWEB)

    Escane, J.M. [Ecole Superieure d' Electricite, 91 - Gif-sur-Yvette (France)

    2005-04-01

    The first part of this article defines the different elements of an electrical network and the models to represent them. Each model involves the current and the voltage as a function of time. Models involving time functions are simple but their use is not always easy. The Laplace transformation leads to a more convenient form where the variable is no more directly the time. This transformation leads also to the notion of transfer function which is the object of the second part. The third part aims at defining the fundamental operation rules of linear networks, commonly named 'general theorems': linearity principle and superimposition theorem, duality principle, Thevenin theorem, Norton theorem, Millman theorem, triangle-star and star-triangle transformations. These theorems allow to study complex power networks and to simplify the calculations. They are based on hypotheses, the first one is that all networks considered in this article are linear. (J.S.)

  17. SEOP cross subsidization between electricity generation companies as a complementary concept to the tax on electricity?; SEOP-Quersubventionierung zwischen Stromproduzenten als Komplementaerkonzept zur Elektrizitaetssteuer?

    Energy Technology Data Exchange (ETDEWEB)

    Krumm, R.

    2000-07-01

    The electricity tax charged in Germany contributes to reducing carbon dioxide emissions in an indirect way, i.e. via the price policy, which is intended to reduce energy consumption. As the taxation approach does not differentiate between renewable or depletable primary energy sources, the tax does not create incentives for an ecologically favourable restructuring of the generation industry. The document in hand therefore explains a complementary approach which introduces the ecological dimension. It is recommended to add a fiscal approach called SEOP, Sectoral tax on Emissions with Output-determined Partial redistribution. Adopting this policy instrument would mean to implement a cross subsidization of low-emission or no-emission electricity generation technologies by the CO2-intensive generation technologies, as a demand-side or technology-based measure supporting the intentions of the tax. Introduction of the SEOP fiscal system is expected to achieve a significant abatement of carbon dioxide emissions due to electricity generation. (orig./CB) [German] Die in der Bundesrepublik erhobene Elektrizitaetssteuer leistet einen Klimaschutzbeitrag nur insoweit, als sie ueber die Induzierung von Preissteigerungen die Stromnachfrage mindert. Da die steuerliche Belastung fuer alle Primaerenergietraeger gleich hoch ist, setzt sie aber keinerlei Anreize fuer eine oekologische Umstrukturierung der Stromerzeugung. Vor diesem Hintergrund wird vorgeschlagen, die Elektrizitaetssteuer durch ein sogenanntes SEOP-Fiskalsystem zu ergaenzen, welches eine Quersubventionierung emissionsarmer und emissionsfreier Elektrizitaetsproduktion durch CO{sub 2}-intensive Stromherstellungsverfahren impliziert. Durch eine solche produktions- bzw. angebotsseitige 'Flankierung' der Elektrizitaetssteuer waere eine spuerbare Minderung der stromerzeugungsbedingten CO{sub 2}-Emissionen realisierbar. (orig.)

  18. Integrated Plant Safety Assessment: Systematic Evaluation Program. Yankee Nuclear Power Station, Yankee Atomic Electric Company, Docket No. 50-29. Final report

    International Nuclear Information System (INIS)

    1983-06-01

    The Systematic Evaluation program was initiated in February 1977 by the US Nuclear Regulatory Commission to review the designs of older operating nuclear reactor plants to confirm and document their safety. The review provides: (1) an assessment of how these plants compare with current licensing safety requirements relating to selected issues, (2) a basis for deciding on how these differences should be resolved in an integrated plant review, and (3) a documented evaluation of plant safety. This report documents the review of Yankee Nuclear Power Station, operated by Yankee Atomic Electric Company. The Yankee plant is one of 10 plants reviewed under Phase II of this program. This report indicates how 137 topics selected for review under Phase I of the program were addressed. Equipment and procedural changes have been identified as a result of the review

  19. Integrated Plant Safety Assessment, Systematic Evaluation Program. Yankee Nuclear Power Station, Yankee Atomic Electric Company, Docket No. 50-29. Draft report

    International Nuclear Information System (INIS)

    1983-02-01

    The Systematic Evaluation Program was initiated in February 1977 by the US Nuclear Regulatory Commission to review the designs of older operating nuclear reactor plants to confirm and document their safety. The review provides (1) an assessment of how these plants compare with current licensing safety requirements relating to selected issues, (2) a basis for deciding on how these differences should be resolved in an integrated plant review, and (3) a documented evaluation of plant safety. This report documents the review of Yankee Nuclear Power Station, operated by Yankee Atomic Electric Company. The Yankee plant is one of 10 plants reviewed under Phase II of this program. This report indicates how 137 topics selected for review under Phase I of the program were addressed. Equipment and procedural changes have been identified as a result of the review

  20. Divide and rule. The economic and legal implications of the proposed ownership unbundling of distribution and supply companies in the Dutch electricity sector

    International Nuclear Information System (INIS)

    Baarsma, B.; Nooij, M. de

    2007-01-01

    In Machiavelli's theory of power, the concept of 'divide and rule' forms the main theme: the ruler has absolute power and to maintain and increase such power all means are justified. When viewed against the background of this theory, the current debate in the Netherlands on the unbundling of energy (electricity, gas) companies can be observed as an example of 'divide and rule', in which the Dutch Minister of Economic Affairs plays a central role. Yet, contrary to Machiavelli in his time, the Dutch government does, in fact, aim principally at the greater welfare of the Dutch people. It is therefore noteworthy that, while important steps in the decision to unbundled have been taken, there is no evidence that the Dutch people will indeed benefit from the envisaged unbundling. (author)

  1. Divide and rule. The economic and legal implications of the proposed ownership unbundling of distribution and supply companies in the Dutch electricity sector

    International Nuclear Information System (INIS)

    Baarsma, Barbara; Nooij, Michiel de; Koster, Weero; Weijden, Cecilia van der

    2007-01-01

    In Machiavelli's theory of power, the concept of 'divide and rule' forms the main theme: the ruler has absolute power and to maintain and increase such power all means are justified. When viewed against the background of this theory, the current debate in the Netherlands on the unbundling of energy (electricity, gas) companies can be observed as an example of 'divide and rule', in which the Dutch Minister of Economic Affairs plays a central role. Yet, contrary to Machiavelli in his time, the Dutch government does, in fact, aim principally at the greater welfare of the Dutch people. It is therefore noteworthy that, while important steps in the decision to unbundled have been taken, there is no evidence that the Dutch people will indeed benefit from the envisaged unbundling

  2. The Tokai-mura JCO criticality accident and the activities of the accident countermeasure support team of Electric Power Companies, Japan

    International Nuclear Information System (INIS)

    Ogawa, Junko

    2000-01-01

    A criticality accident occurred at the JCO Tokai-mura nuclear fuel processing plant on September 30, 1999. This accident brought the damages which were unrivaled in the history of atomic energy development in Japan, seriously influencing the citizen life to such an extent as requesting for 320,000 inhabitants within 10 kilometers radius to stay indoors for as long as 18 hours. However, it could be said that though three workers suffered fatal injuries, no substantial hazards were made upon the regional inhabitants due to little release of radioactive substances. This video recorded the activities of the Accident Countermeasure Support Team of the Electric Power Companies immediately after the accident occurred, showing the chronological overview of the particulars of the accident. (author)

  3. Divide and rule. The economic and legal implications of the proposed ownership unbundling of distribution and supply companies in the Dutch electricity sector

    Energy Technology Data Exchange (ETDEWEB)

    Baarsma, B.; Nooij, M. de [University of Amsterdam (Netherlands). SEO Economic Research; Koster, W.; Weijden, C. van der [Norton Rose Advocaten and Solicitors, Amsterdam (Netherlands)

    2007-03-15

    In Machiavelli's theory of power, the concept of 'divide and rule' forms the main theme: the ruler has absolute power and to maintain and increase such power all means are justified. When viewed against the background of this theory, the current debate in the Netherlands on the unbundling of energy (electricity, gas) companies can be observed as an example of 'divide and rule', in which the Dutch Minister of Economic Affairs plays a central role. Yet, contrary to Machiavelli in his time, the Dutch government does, in fact, aim principally at the greater welfare of the Dutch people. It is therefore noteworthy that, while important steps in the decision to unbundled have been taken, there is no evidence that the Dutch people will indeed benefit from the envisaged unbundling. (author)

  4. 76 FR 17447 - Penske Logistics LLC a Subsidiary of General Electric/Penske Corporation Including On-Site Leased...

    Science.gov (United States)

    2011-03-29

    ... DEPARTMENT OF LABOR Employment and Training Administration [TA-W-74,897] Penske Logistics LLC a Subsidiary of General Electric/Penske Corporation Including On-Site Leased Workers From Kelly Temporary... (TAA) applicable to workers and former workers of Penske Logistics LLC, a subsidiary of General...

  5. CO2 burden and climatic risk. Strategies of action of the German electricity supply companies. 2. rev. ed.

    International Nuclear Information System (INIS)

    1992-01-01

    According to indications of the working group for questions on the climate of the association of German electric utilities (VDEW), energy application of power generation contributes to the German CO 2 -emission with about 30%. A reduction of CO 2 -emissions in electro-economics can be achieved especially with a decrease of the application of fossil energy sources parallel to a better energy utilization (increase of the efficiency, enlargement of cogeneration) and through the expansion of power generation free from CO 2 (nuclear energy, renewable energy sources). (orig.) [de

  6. A Conceptual Model for the Creation of a Process-Oriented Knowledge Map (POK-Map and Implementation in an Electric Power Distribution Company

    Directory of Open Access Journals (Sweden)

    Babak Teimourpour

    2015-12-01

    Full Text Available Helping a company organize and capture the knowledge used by its employees and business processes is a daunting task. In this work we examine several proposed methodologies and synthesize them into a new methodology that we demonstrate through a case study of an electric power distribution company. This is a practical research study. First, the research approach for creating the knowledge map is process-oriented and the processes are considered as the main elements of the model. This research was done in four stages: literature review, model editing, model validation and case study. The Delphi method was used for the research model validation. Some of the important outputs of this research were mapping knowledge flows, determining the level of knowledge assets, expert-area knowledge map, preparing knowledge meta-model, and updating the knowledge map according to the company’s processes. Besides identifying, auditing and visualizing tacit and explicit knowledge, this knowledge mapping enables us to analyze the knowledge areas’ situation and subsequently help us to improve the processes and overall performance. So, a process map does knowledge mapping in a clear and accurate frame. Once the knowledge is used in processes, it creates value.

  7. Assessment of the prevalence of occupational accidents and their influential actors in an electricity distribution company during a five-year period.

    Science.gov (United States)

    Sadeghain, Marzieh; Farid, Ramin Ataei; Dormohammadi, Ali; Aghaei, Habib Allah; Rahmani, Abdolrasoul; Farhadi, Rozita; Eskandari, Rasoul; Karchani, Mohsen

    2013-01-01

    Occupational accidents have been considered as one of the most important crippling factors contributing to disabilities and life-threatening situations in many countries. This study was conducted to survey the prevalence of occupational accidents and the factors of that lead to injuries in an Electricity Distribution Company during a five-year period. In this descriptive study, the accident report form included items asking about the season of the year when the accident occurred, the ages and the average age of those injured, the type of employment, work experience, nature of the injuries that occurred, parts of the body affected, treatments that were applied, average number of days lost per accident, the levels of education of those involved, and their marital status. Data was analyzed using SPSS. A total of 66 Electricity Distribution Company workers were determined to be suffering from injuries due to accidents. The accidents mostly occurred in the summer (33%). Most of the injured workers (16.7%) belonged to the age groups of 25 to 29 and 40 to 44; there were no accidents reported for workers who were less than 20. About 48% of the accident victims had to be hospitalized. Furthermore, 35% of the accident victims were treated in outpatient clinics, and 7.4% of the accident victims died. We demonstrated that there were significant relationships between: 1) marital status and accidental injuries (P0.05) or work experience and the distribution of the accidents (P>0.05). This study indicated that most of the injuries in these accidents were related to the nature of employment, marital status, and level of education. The results showed the necessity for providing appropriate safety training for the workers.

  8. Assessment of the prevalence of occupational accidents and their influential actors in an electricity distribution company during a five-year period

    Science.gov (United States)

    Sadeghain, Marzieh; Farid, Ramin Ataei; Dormohammadi, Ali; Aghaei, Habib Allah; Rahmani, Abdolrasoul; Farhadi, Rozita; Eskandari, Rasoul; Karchani, Mohsen

    2013-01-01

    Background: Occupational accidents have been considered as one of the most important crippling factors contributing to disabilities and life-threatening situations in many countries. This study was conducted to survey the prevalence of occupational accidents and the factors of that lead to injuries in an Electricity Distribution Company during a five-year period. Methods: In this descriptive study, the accident report form included items asking about the season of the year when the accident occurred, the ages and the average age of those injured, the type of employment, work experience, nature of the injuries that occurred, parts of the body affected, treatments that were applied, average number of days lost per accident, the levels of education of those involved, and their marital status. Data was analyzed using SPSS. Results: A total of 66 Electricity Distribution Company workers were determined to be suffering from injuries due to accidents. The accidents mostly occurred in the summer (33%). Most of the injured workers (16.7%) belonged to the age groups of 25 to 29 and 40 to 44; there were no accidents reported for workers who were less than 20. About 48% of the accident victims had to be hospitalized. Furthermore, 35% of the accident victims were treated in outpatient clinics, and 7.4% of the accident victims died. We demonstrated that there were significant relationships between: 1) marital status and accidental injuries (P0.05) or work experience and the distribution of the accidents (P>0.05). Conclusion: This study indicated that most of the injuries in these accidents were related to the nature of employment, marital status, and level of education. The results showed the necessity for providing appropriate safety training for the workers. PMID:26120397

  9. 76 FR 70382 - Airworthiness Directives; General Electric Company (GE) CF6-80C2B Series Turbofan Engines

    Science.gov (United States)

    2011-11-14

    ... to an emergency or forced landing of the airplane. DATES: We must receive comments on this proposed... an emergency or forced landing of the airplane. FAA's Determination We are proposing this AD because... labor rate is $85 per work-hour. A replacement ECU costs about $4,600. Based on these figures, we...

  10. 75 FR 32649 - Airworthiness Directives; General Electric Company CF6-45 and CF6-50 Series Turbofan Engines

    Science.gov (United States)

    2010-06-09

    ... of LPT rotor stage 3 disks and eight reports of cracked LPT rotor stage 3 disks found during shop... a corresponding shift in the trending of fuel flow or fan speed/core speed relationship. You can...

  11. 75 FR 21161 - Airworthiness Directives; General Electric Company (GE) CJ610 Series Turbojet Engines and CF700...

    Science.gov (United States)

    2010-04-23

    ... reports of six combustion liners with premature cracks. We are issuing this AD to prevent premature cracks in the combustion liner, which could release pieces of the inner combustion liner. A release of pieces of the inner combustion liner could cause an uncontained failure of the engine turbine and damage...

  12. Safety evaluation report: related to the operation of Perry Nuclear Power Plant, Units 1 and 2, Docket Nos. 50-440 and 50-441, Cleveland Electric Illuminating Company

    International Nuclear Information System (INIS)

    1982-08-01

    Supplement No. 1 to the Safety Evaluation Report on the application filed by the Cleveland Electric Illuminating Company on behalf of itself and as agent for the Duquesne Light Company, the Ohio Edison Company, the Pennsylvania Power Company, and the Toledo Edison Company (the Central Area Power Coordination Group, CAPCO), as applicants and owners, for a license to operate the Perry Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-440 and 441). The facility is located near Lake Erie in Lake County, Ohio. This supplement has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission and reports the status of certain items that had not been resolved at the time of publication of the Safety Evaluation Report

  13. Implementation of the rapid cross section adjustment approach at General Electric

    International Nuclear Information System (INIS)

    Cowan, C.L.; Kujawski, E.; Protsik, R.

    1978-01-01

    The General Electric rapid cross section adjustment approach was developed to use the shielding factor method for formulating multigroup cross sections. In this approach, space- and composition-dependent cross sections for a particular reactor or shield design are prepared from a generalized cross section library by the use of resonance self-shielding factors, and by the adjustment of elastic scattering cross sections for the local neutron flux spectra. The principal tool in the cross section adjustment package is the data processing code TDOWN. This code was specified to give the user a high degree of flexibility in the analysis of advanced reactor designs. Of particular interest in the analysis of critical experiments is the ability to carry out cell heterogeneity self-shielding calculations using a multiregion equivalence relationship, and the homogenization of the cross sections over the specified cell with the flux weighting obtained from transport theory calculations. Extensive testing of the rapid cross section adjustment approach, including comparisons with Monte Carlo methods, indicated that this approach can be utilized with a high degree of confidence in the design analysis of complex fast reactor systems. 2 figures, 1 table

  14. Draft environmental impact statement for construction and operation of the proposed Bangor Hydro-Electric Company`s second 345-kV transmission tie line to New Brunswick

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-10-01

    This Draft Environmental Impact Statement (DEIS) was prepared by the US Department of Energy (US DOE). The proposed action is the issuance of Presidential Permit PP-89 by DOE to Bangor Hydro-Electric Company to construct and operate a new international transmission line interconnection to New Brunswick, Canada that would consist of an 83.8 mile (US portion), 345-kilovolt (kV) alternating current transmission line from the US-Canadian border at Baileyville, Maine to an existing substation at Orrington, Maine. The principal environmental impacts of the construction and operation of the transmission line would be incremental in nature and would include the conversion of forested uplands (mostly commercial timberlands) and wetlands to right-of-way (small trees, shrubs, and herbaceous vegetation). The proposed line would also result in localized minor to moderate visual impacts and would contribute a minor incremental increase in the exposure of some individuals to electromagnetic fields. This DEIS documents the purpose and need for the proposed action, describes the proposed action and alternatives considered and provides a comparison of the proposed and alternatives routes, and provides detailed information on analyses of the environmental consequences of the proposed action and alternatives, as well as mitigative measures to minimize impacts.

  15. Preparing Canada's power systems for transition to the year 2000: the Y2K programs of Canada's electric utility companies: province-by-province report

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1999-09-01

    The province-by-province report covers BC Hydro; TransAlta, ATCO Ltd., EPCOR, and Enmax, SaskPower, Manitoba Hydro, Winnipeg Hydro, Ontario Power Generation, Ontario Hydro Services Company, Toronto Hydro, Hydro-Quebec and Energie Maclaren, Newfoundland and Labrador Hydro, Newfoundland Power, Nova Scotia Power, Maritime Electric,Yukon and Northwest Territories,Yukon Electrical Company Ltd., Northland Utilities (Yellowknife) Ltd. and Northland Utilities (NWT) Ltd. A report typically deals with inventory, testing and remediation of business systems, inventory, testing and remediation of operational control devices, business partner reviews, and preparation and exercising of contingency plans, as well as Y2K status and readiness reports, and dateline preparations.

  16. National technical report (Matsushita Electric Industrial Company), Vol. 41, No. 3, June 1995. Special issue on environmental technologies

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    ;Contents: Preface to Special Issue on Environmental Technologies; Total System for Recycling and Optimal Treatment of Waste Home Electric Appliances; Material Reduction Design Using Computer Aided Engineering; Rewritable Thermal Recording Sheet; Reusable Taping System; Estimating Method for Disassembly of Home Appliances; Thermal Design Technique to Reduce Furnace Running Cost to Half; Study of Air Conditioner Using HFC Refrigerant Blend; High-Efficiency Compact Rotary Compressor Using New Refrigerant HFC 134a for Automotive Air Conditioner; Simulation for Refrigerators Using HFC 134a; Zero-ODP (Ozone Depletion Potential) Rigid Insulation Foams for Refrigerators; Heat Energy of Industrial Waste Combustion Gas Utilization System; Exhaust Gas Denitrification System for Car Road Tunnels and Underground Parking Areas; Apparatus for Regenerating Diesel Particulate Filter Using Microwave; Analysis of Advanced Treatment System of Heavy Metals in Waste Water; Ventilating and Air-Conditioning System for Energy-Saving Houses; Garbage Disposer; and Anti-Microbial Resin and Applications to Products in Harmony with Living Environment.

  17. Regulating technological change - The strategic reactions of utility companies towards subsidy policies in the German, Spanish and UK electricity markets

    International Nuclear Information System (INIS)

    Stenzel, Till; Frenzel, Alexander

    2008-01-01

    This paper focuses on how incumbent electric utilities strategically react to subsidy schemes supporting renewable energy technologies in the UK, Germany, and Spain. Firms coordinate the development of their technological capabilities and their political activities to shape their regulatory environment. Analysing the diffusion of wind power in these countries, we show that the different ways, in which firms coordinate their technological and political strategies, lead to very different market outcomes, both for the firms' market share and the size of the overall market. Although incumbents are usually seen as being resistant to change in energy systems, we show that Spanish utilities proactively drive the diffusion of wind power. We speculate about the relation between the ownership structure of the energy system and its inertia with respect to the integration of new technologies. We derive novel policy implications that explicitly take into account the strategic actions of incumbent firms shaping the technological and regulatory system

  18. Operational and Environmental Efficiencies of Japanese Electric Power Companies from 2003 to 2015: Influence of Market Reform and Fukushima Nuclear Power Accident

    Directory of Open Access Journals (Sweden)

    Mika Goto

    2017-01-01

    Full Text Available This study measures operational and environmental efficiencies of nine incumbent electric power companies (EPCos in Japan and examines an influence of market reform and Fukushima nuclear power plant accident on efficiencies using a data set from 2003 to 2015. This study applies output-oriented radial data envelopment analysis (DEA model to the measurement of efficiencies. Three inputs and three desirable outputs are used for the measurement of operational efficiency, and one undesirable output besides inputs and desirable outputs is used to measure environmental efficiency. EPCos produce not only desirable output, for example, electricity, but also undesirable output, for example, CO2, for their operations. For the measurement of environmental efficiency, this study uses a unique DEA model that assumes occurrence of ecotechnology innovation. The results reveal that environmental efficiency of EPCos is mostly invariant over the period of this study, while operational efficiency decreases in the same period. In addition, the results present that Japanese EPCos make efforts to reduce CO2 emissions by promoting ecotechnology innovation. The Kruskal–Wallis rank sum test indicates differences in operational and environmental efficiencies among EPCos. Such performance differences might become larger as market liberalization advances, which could lead to further structural changes of the industry.

  19. Electric dipole moments of charged leptons and lepton flavor violating interactions in the general two Higgs doublet model

    International Nuclear Information System (INIS)

    Iltan, E. O.

    2001-01-01

    We calculate the electric dipole moment of the electron using the experimental result of the muon electric dipole moment and upper limit of the BR(μ->eγ) in the framework of the general two Higgs doublet model. Our prediction is 10 -32 ecm, which lies in the experimental current limits. Further, we obtain constraints for the Yukawa couplings {bar ξ} N,τe D and {bar ξ} N,τμ D . Finally, we present an expression which connects the BR(τ->μγ) and the electric dipole moment of the τ lepton and study the relation between these physical quantities

  20. 29 CFR 2550.401c-1 - Definition of “plan assets”-insurance company general accounts.

    Science.gov (United States)

    2010-07-01

    ... individual and group life, health, disability, and annuity contracts. Experience rated general account... any such assets are plan assets) with the care, skill, prudence and diligence under the circumstances...

  1. Information Centre and ``Cockpit`` of a modern electricity supply company: the data warehouse; Informationszentrale und ``Cockpit`` eines modernen EVU: das Data Warehouse

    Energy Technology Data Exchange (ETDEWEB)

    Kuebert, K. [Unterfraenkische Ueberlandzentrale (UUEZ), Luelsfeld (Germany); Gimenez, O. [Franken-Data GmbH, Erlangen (Germany)

    1999-06-14

    Electricity supply companies have a big advantage: They continuously measure consumer behaviour, thanks to network control systems, centralised multistations and remote meter reading. However, they do not combine this data on a consistent basis frequently enough to be able to draw valuable consequences for sales and marketing. One of the few exceptions in the Unterfraenkische Ueberlandzentrale, UUeZ (Lower Franconian Electricity Supply Company). At UUeZ, the meter readings from each individual load profile meter built into the plant of customers with special contracts, are fed together into a `cockpit`. Assisted by a Data-Warehouse-Solution from FrankenData GmbH, an ingenious information system that enables longterm trends and optimisation potential to be recognised immediately was implemented. The benefits for electricity suppliers: A constant load factor and reduction of peaks, improved customer contact as well as more precise information at negotiations and therefore more advantageous contracts. Customers also benefit from the new system: They receive more economical tariffs and detailed reports about their consumer behaviour, which they can then optimise by taking appropriate measures. (orig.) [Deutsch] Energieversorgungsunternehmen haben gegenueber anderen Unternehmen den Vorteil, dass sie das Verbraucherverhalten dank Netzleitsystemen, Roundsteuerung und neuerdings auch Zaehlerfernablesung kontinuierlich messen. Allerdings fuehren sie diese Daten meist nicht konsequent genug zusammen, um daraus wertvolle Schluesse fuer Vertrieb und Marketing zu ziehen. Eine der wenigen Ausnahmen ist die Unterfraenkische Ueberlandzentrale (UUeZ). Bei der UUeZ laufen die Zaehlwerte von jedem einzelnen Lastprofilzaehler, der in die Anlagen der Sondervertragskunden eingebaut ist, in einem `Cockpit` zusammen. Mit Hilfe einer Data-Warehouse-Loesung der FrankenData GmbH wurde ein ausgekluegeltes Informationssystem realisiert, das langfristige Trends und Optimierungspotentiale sofort

  2. 76 FR 11437 - Application To Export Electric Energy; Societe Generale Energy Corp.

    Science.gov (United States)

    2011-03-02

    ... reliability of the U.S. electric power supply system. Copies of this application will be made available, upon... surplus energy purchased from electric utilities, Federal power marketing agencies and other entities... DEPARTMENT OF ENERGY [OE Docket No. EA-376] Application To Export Electric Energy; Societe...

  3. Electricity

    CERN Document Server

    Basford, Leslie

    2013-01-01

    Electricity Made Simple covers the fundamental principles underlying every aspect of electricity. The book discusses current; resistance including its measurement, Kirchhoff's laws, and resistors; electroheat, electromagnetics and electrochemistry; and the motor and generator effects of electromagnetic forces. The text also describes alternating current, circuits and inductors, alternating current circuits, and a.c. generators and motors. Other methods of generating electromagnetic forces are also considered. The book is useful for electrical engineering students.

  4. The risk-based approach to ATMP development - generally accepted by regulators but infrequently used by companies.

    Science.gov (United States)

    Kooijman, M; van Meer, P J K; Gispen-de Wied, C C; Moors, E H M; Hekkert, M P; Schellekens, H

    2013-11-01

    Advanced therapy medicinal products (ATMPs) are the cutting edge of drug innovation. ATMPs have different challenges than other drug classes. To accommodate these challenges and facilitate science-driven development, flexibility in the requirements to demonstrate the safety and efficacy of this rapidly evolving drug class is necessary. To create flexibility, the European Union introduced the risk-based approach. This approach provides the possibility of omitting guideline-based studies based on risk analyses. To gain insight into the effect of the risk-based approach on the non-clinical development of ATMPs, two questions are addressed in this paper. Firstly, "Do companies use a risk-based approach for the non-clinical development of ATMPs?" and, secondly, "Does the Committee for Medicinal Products for Human Use (CHMP) of the European Medicines Agency (EMA) accept non-clinical development programs based on the risk-based approach?" Scientific advice letters formulated by the CHMP were analyzed. The risk-based approach was used to justify deviations from the guidelines in the majority (75%) of the cases. The CHMP accepted 40% of the proposals to omit studies and stated that additional data was necessary to make an informed decision for 35% of the proposals. This indicates that the risk-based approach facilitates the science-driven development of ATMPs. Copyright © 2013 Elsevier Inc. All rights reserved.

  5. Exposure to electromagnetic fields and the risk of disease in the central nervous system in employees at Danish electric companies; Udsaettelse for elektromagnetiske felter og risiko for sygdomme i det centrale nervesystem blandt ansatte ved danske elselskaber

    Energy Technology Data Exchange (ETDEWEB)

    Johansen, Christoffer

    2002-07-01

    Introduction: Occupational exposure to electromagnetic fields has been associated with neurological diseases, such as amyotrophic lateral sclerosis, senile dementia, Parkinson's disease and Alzheimer's disease. Material and method: I studied the incidence of disease in the central nervous system in 30,631 persons employed at Danish electric companies between 1900 and 1993. I linked the cohort to the nationwide, population-based Danish National Register of Patients and compared the number of cases of these diseases found between 1978 and 1993 with the corresponding rates in the general population. In addition, I fit the data on utility workers to a multiplicative Poisson regression model in relation to estimated levels of exposure to 50 Hz electromagnetic fields. Results: Overall, there was an increase in the risk of senile dementia and motor neuron diseases combined. The incidence of Parkinson's disease, Alzheimer's disease and other diseases of the central nervous system were essentially unrelated to exposure to electromagnetic fields. A decreased risk of epilepsy compared with the general population probably reflects a healthy worker effects; I observed an increased risk of epilepsy based on internal comparisons. Discussion: The increased risk of senile dementia and motor-neuron diseases may be associated with above average levels of exposure to electromagnetic fields. (au)

  6. Global Infrastructure Investment, Competition,and the Japanese Companies

    OpenAIRE

    新保, 博彦; シンポ, ヒロヒコ; Hirohiko, SHIMPO

    2011-01-01

    This paper discusses four infrastructure industries all of which are expected to grow rapidly in the 21st century: the electric power industry, the water industry, the railroad industry, and the aircraft and space development. First, this paper describes the general trends of the FDI in the four noted industries. Based on the above examinations, this paper investigates these industrial trends, focusing on specific companies in various countries. To investigate each individual company, this pa...

  7. Seismic risk analysis for General Electric Plutonium Facility, Pleasanton, California. Final report, part II

    International Nuclear Information System (INIS)

    1980-01-01

    This report is the second of a two part study addressing the seismic risk or hazard of the special nuclear materials (SNM) facility of the General Electric Vallecitos Nuclear Center at Pleasanton, California. The Part I companion to this report, dated July 31, 1978, presented the seismic hazard at the site that resulted from exposure to earthquakes on the Calaveras, Hayward, San Andreas and, additionally, from smaller unassociated earthquakes that could not be attributed to these specific faults. However, while this study was in progress, certain additional geologic information became available that could be interpreted in terms of the existance of a nearby fault. Although substantial geologic investigations were subsequently deployed, the existance of this postulated fault, called the Verona Fault, remained very controversial. The purpose of the Part II study was to assume the existance of such a capable fault and, under this assumption, to examine the loads that the fault could impose on the SNM facility. This report first reviews the geologic setting with a focus on specifying sufficient geologic parameters to characterize the postulated fault. The report next presents the methodology used to calculate the vibratory ground motion hazard. Because of the complexity of the fault geometry, a slightly different methodology is used here compared to the Part I report. This section ends with the results of the calculation applied to the SNM facility. Finally, the report presents the methodology and results of the rupture hazard calculation

  8. Standard technical specifications General Electric plants, BWR/6. Volume 1, Revision 1

    International Nuclear Information System (INIS)

    1995-04-01

    This report documents the results of the combined effort of the NRC and the industry to produce improved Standard Technical Specifications (STS), Revision 1 for General Electric BWR/6 Plants. The changes reflected in Revision 1 resulted from the experience gained from license amendment applications to convert to these improved STS or to adopt partial improvements to existing technical specifications. This NUREG is the result of extensive public technical meetings and discussions between the Nuclear Regulatory Commission (NRC) staff and various nuclear power plant licensees, Nuclear Steam Supply System (NSSS) Owners Groups, NSSS vendors, and the Nuclear Energy Institute (NEI). The improved STS were developed based on the criteria in the Final Commission Policy Statement on Technical Specifications Improvements for Nuclear Power Reactors, dated July 22, 1993. The improved STS will be used as the basis for individual nuclear power plant licensees to develop improved plant-specific technical specifications. This report contains three volumes. Volume 1 contains the Specifications for all chapters and sections of the improved STS. Volume 2 contains the Bases for Chapters 2.0 and 3.0, and Sections 3.1--3.3 of the improved STS. Volume 3 contains the Bases for Sections 3.4--3.10 of the improved STS

  9. Standard technical specifications: General Electric plants, BWR/4. Volume 1, Revision 1: Specifications

    International Nuclear Information System (INIS)

    1995-04-01

    This report documents the results of the combined effort of the NRC and the industry to produce improved Standard Technical Specifications (STS), Revision 1 for General Electric BWR/4 Plants. The changes reflected in Revision 1 resulted from the experience gained from license amendment applications to convert to these improved STS or to adopt partial improvements to existing technical specifications. This NUREG is the result of extensive public technical meetings and discussions between the Nuclear Regulatory Commission (NRC) staff and various nuclear power plant licensees, Nuclear Steam Supply System (NSSS) Owners Groups, NSSS vendors, and the Nuclear Energy Institute (NEI). The improved STS were developed based on the criteria in the Final Commission Policy Statement on Technical Specifications Improvements for Nuclear Power Reactors, dated July 22, 1993. The improved STS will be used as the basis for individual nuclear power plant licensees to develop improved plant-specific technical specifications. This report contains three volumes. Volume 1 contains the Specifications for all chapters and sections of the improved STS. Volume 2 contains the Bases for Chapters 2.0 and 3.0, and Sections 3.1--3.3 of the improved STS. Volume 3 contains the Bases for Sections 3.4--3.10 of the improved STS

  10. A generalized model for transport of contaminants in soil by electric fields.

    Science.gov (United States)

    Paz-Garcia, Juan Manuel; Baek, Kitae; Alshawabkeh, Iyad D; Alshawabkeh, Akram N

    2012-01-01

    A generalized model applicable to soils contaminated with multiple species under enhanced boundary conditions during treatment by electric fields is presented. The partial differential equations describing species transport are developed by applying the law of mass conservation to their fluxes. Transport, due to migration, advection and diffusion, of each aqueous component and complex species are combined to produce one partial differential equation that describes transport of the total analytical concentrations of component species which are the primary dependent variables. This transport couples with geochemical reactions such as aqueous equilibrium, sorption, precipitation and dissolution. The enhanced model is used to simulate electrokinetic cleanup of lead and copper contaminants at an Army Firing Range. Acid enhancement is achieved by the use of adipic acid to neutralize the basic front produced for the cathode electrochemical reaction. The model is able to simulate enhanced application of the process by modifying the boundary conditions. The model showed that kinetics of geochemical reactions, such as metals dissolution/leaching and redox reactions, may be significant for realistic prediction of enhanced electrokinetic extraction of metals in real-world applications.

  11. Aging assessment of Westinghouse PWR and General Electric BWR containment isolation functions

    Energy Technology Data Exchange (ETDEWEB)

    Lee, B.S.; Travis, R.; Grove, E.; DiBiasio, A.

    1996-03-01

    A study was performed to assess the effects of aging on the Containment Isolation (CI) functions of Westinghouse Pressurized Water Reactors and General Electric Boiling Water Reactors. This study is part of the Nuclear Plant Aging Research (NPAR) program, sponsored by the U.S. Nuclear Regulatory Commission. The objectives of this program are to provide an understanding of the aging process and how it affects plant safety so that it can be properly managed. This is one of a number of studies performed under the NPAR program which provide a technical basis for the identification and evaluation of degradation caused by age. Failure data from two national databases, Nuclear Plant Reliability Data System (NPRDS) and Licensee Event Reports (LERs), as well as plant specific data were reviewed and analyzed to understand the effects of aging on the CI functions. This study provided information on the effects of aging on component failure frequency, failure modes, and failure causes. Current inspection, surveillance, and monitoring practices were also reviewed.

  12. Aging assessment of Westinghouse PWR and General Electric BWR containment isolation functions

    International Nuclear Information System (INIS)

    Lee, B.S.; Travis, R.; Grove, E.; DiBiasio, A.

    1996-03-01

    A study was performed to assess the effects of aging on the Containment Isolation (CI) functions of Westinghouse Pressurized Water Reactors and General Electric Boiling Water Reactors. This study is part of the Nuclear Plant Aging Research (NPAR) program, sponsored by the U.S. Nuclear Regulatory Commission. The objectives of this program are to provide an understanding of the aging process and how it affects plant safety so that it can be properly managed. This is one of a number of studies performed under the NPAR program which provide a technical basis for the identification and evaluation of degradation caused by age. Failure data from two national databases, Nuclear Plant Reliability Data System (NPRDS) and Licensee Event Reports (LERs), as well as plant specific data were reviewed and analyzed to understand the effects of aging on the CI functions. This study provided information on the effects of aging on component failure frequency, failure modes, and failure causes. Current inspection, surveillance, and monitoring practices were also reviewed

  13. Smart electric grids. Economic and environmental value, general implementation. September 2017. Contribution by RTE - Full report

    International Nuclear Information System (INIS)

    2017-09-01

    This report is the RTE's contribution to studies commissions by public authorities on the social and economic valorisation of smart grids for the different actors. It first proposes an overview of the various considered technical and technological solutions: storage, active management of residential, tertiary and industrial demand, and steerability of renewable energies. After a recall of objectives related to the development of smart grids, the report reviews the methodological framework adopted for a previous study (general principles, modelling principles for the electricity system operation, use of the Flexis model, economic and environmental assessment), and proposes an overview of methodological developments achieved since 2015. It discusses how this study compares with others related to smart grid flexibility published in France and in Europe. Then, after having stated some hypotheses, the report presents the analytical framework for quantitative results, discusses economic and environmental assessments performed for each solution (storage, active management for different sectors, and steerability of wind energy production). The next part presents different global economically relevant scenarios of smart grid deployment, with assessments by 2030

  14. Additional costs for Norwegian power companies from the OED-proposed implementation of the Electricity Directive II; Merkostnader for norske kraftselskaper ved OEDs forslag til implementering av Eldirektiv II

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    The cost-related consequences for Norwegian vertically integrated power companies caused by the proposed implementation of Electricity Directive II by OED (Norwegian Oil and Energy Department) are considered. Electricity Directive II demands a company and functional division between the network activities and the activities exposed to competition. The OED proposition aims at lowering the limit for which network companies are included by the new demands, from 100.000 to either 20.000 or 10.000 network clients. Moreover, they propose measures that ensure the network companies' independence, and these exceed by far the minimum requirements of Electricity Directive II. The additional costs may be significant in some aspects. Especially the requirement of an independent management in parent- and subsidiary company will lead to added costs of about Nok 320 million for the Norwegian power business. Further, a split-up management structure may be poorly compatible with the mind set behind the corporate model, something which potentially can lead to bad investments or a weaker utilization of potential cost synergies. The motive for proposing stricter demands on Norwegian power business is among other to limit cross-subsidies so that the competition in the market is reinforced. In light of substantial, quantified additional costs and other negative effects, the proposition's effect on the competition should be investigated further, including alternative measures that may be more cost-effective and/or more accurate (ml)

  15. Hoisting the Sails, Shining the Bright Pearl——Interviewing LiQingPing, Vice Chairman of the Board of International Pearl Jadeite Jewelry Investment Company, General Manager & CEO of Ming Qin Jewelry Group

    Institute of Scientific and Technical Information of China (English)

    2006-01-01

    @@ Li Qingping was born in Wuning County, Jiangxi Province, in 1954. Now, he is Vice Chairman of the Board of International Pearl, Jadeite and Jewelry Investment Company, General Manager & CEO of Ming Qin Jewelry Group.

  16. Inquiry relating to modifications of reactor installation in Genkai No. 1 and 2 nuclear power plants of Kyushu Electric Power Company, Inc

    International Nuclear Information System (INIS)

    1979-01-01

    Application was made to the Minister of International Trade and Industry for the license relating to the modifications of reactor installation in the Genkai No. 1 and 2 nuclear power plants, Kyushu Electric Power Company, Inc., on February 27, 1979, from the president of the company. After the safety evaluation was finished by the Ministry of International Trade and Industry, inquiry was conducted to the head of the Atomic Energy Safety Commission (AESC) on June 15, 1979 from the Minister of International Trade and Industry. The investigation and discussion were commenced by the AESC on June 19, 1979. The modifications of the reactor installation are the increase of new fuel storage capacity from about 1/3 to about 2/3 of in-core fuel for each plant, the new establishment of a miscellaneous solid waste incinerator which is common to both plants, and the enlargement of a solid waste storage which is also common to both plants. The contents of the safety examination for each item written above are presented. The prevention of criticality is carefully practiced for the new fuel storage by putting fuel assemblies in stainless steel can type racks and locating the fuel assemblies at the proper distance. The miscellaneous solid waste incinerator building is designed as the B class aseismatic structure and also as the controlled area with adequate shielding and ventilating facilities. The decontamination factor of the incinerator facility is more than 10 5 , and the necessary monitoring system is provided in the building. Concerning the solid waste storage, the additional storage area is about 1600 m 2 , and the storage capacity is about ten years quantity. This building is designed as the B class aseismatic structure. (Nakai, Y.)

  17. Citar documentos electrónicos. Revisión de propuestas y planteamiento de pautas generales

    Directory of Open Access Journals (Sweden)

    Mari Carmen Marcos Mora

    2002-01-01

    Full Text Available Se recogen las propuestas de normalización de citas de documentos electrónicos de varios autores que a su vez se basan para desarrollarlas en los estilos publicados por la ISO, la APA y la MLA. Se ofrecen unas pautas generales de aplicación que suponen una unificación de las presentadas

  18. 75 FR 11920 - General Electric Lighting-Ravenna Lamp Plant, Lighting Division, Including On-Site Leased Workers...

    Science.gov (United States)

    2010-03-12

    ... to the production of high intensity discharge lamps. The review shows that on August 24, 2007, a...-Ravenna Lamp Plant, Lighting Division, Including On-Site Leased Workers from Devore Technologies, Ravenna..., 2009, applicable to workers of General Electric Lighting-Ravenna Lamp Plant, Lighting Division...

  19. 77 FR 14838 - General Electric-Hitachi Global Laser Enrichment LLC, Commercial Laser-Based Uranium Enrichment...

    Science.gov (United States)

    2012-03-13

    ... Laser Enrichment LLC, Commercial Laser-Based Uranium Enrichment Facility, Wilmington, North Carolina... a license to General Electric-Hitachi Global Laser Enrichment LLC (GLE or the applicant) to authorize construction of a laser-based uranium enrichment facility and possession and use of byproduct...

  20. Differential Treatment of Pregnancy in Employment: The Impact of "General Electric Co. v. Gilbert" and "Nashville Gas Co. v. Satty."

    Science.gov (United States)

    Taylor, Ellen T.

    1978-01-01

    After discussing the facts and reasoning of the two cases (General Electric Co. vs Gilbert and Nashville Gas Co. vs Satty), the author argues that the decisions are largely the product of pregnancy stereotypes and that the Court's reasoning is flawed and should not be applied outside the context of pregnancy. Journal availability: see EA 511 481.…

  1. How did the General Purpose Technology Electricity contribute to the Second Industrial Revolution (II): The Communication Engines

    NARCIS (Netherlands)

    van der Kooij, B.J.G.

    2017-01-01

    The concept of the General Purpose Technology (GPT) of the late 1990s is a culmination of many evolutionairy views in innovation-thinking. By definition the GPT considers the technical, social, and economic effects of meta-technologies like steam-technology and electric technology. This paper uses

  2. Chapter 1. The structure of the company

    International Nuclear Information System (INIS)

    1998-01-01

    In the first chapter of this CD ROM the structure of the Slovak Electric, Plc. (Slovenske elektrarne, a.s.) in 1998 is presented. It consist of next paragraphs (1) The history (The origin of the SE, Plc.; Main events of 1995; Main events of 1996; Main events of 1997); (2) The bodies of SE, Plc. (General Meeting of Shareholders; Supervisory Board; Board of Directors); (3) Organizational structure of the the Company (The Headquarters of SE, Plc.; SE, Plc, Transmission System)

  3. Radioactive waste shipments to Hanford Retrievable Storage from the General Electric Vallecitos Nuclear Center, Pleasanton, California

    International Nuclear Information System (INIS)

    Vejvoda, E.J.; Pottmeyer, J.A.; DeLorenzo, D.S.; Weyns-Rollosson, M.I.; Duncan, D.R.

    1993-10-01

    During the next two decades the transuranic (TRU) wastes now stored in the burial trenches and storage facilities at the Hanford Site are to be retrieved, processed at the Waste Receiving and Processing Facility, and shipped to the Waste Isolation Pilot Plant near Carlsbad, New Mexico for final disposal. Approximately 3.8% of the TRU waste to be retrieved for shipment to WIPP was generated at the General Electric (GE) Vallecitos Nuclear Center (VNC) in Pleasanton, California and shipped to the Hanford Site for storage. The purpose of this report is to characterize these radioactive solid wastes using process knowledge, existing records, and oral history interviews. The waste was generated almost exclusively from the activities, of the Plutonium Fuels Development Laboratory and the Plutonium Analytical Laboratory. Section 2.0 provides further details of the VNC physical plant, facility operations, facility history, and current status. The solid radioactive wastes were associated with two US Atomic Energy Commission/US Department of Energy reactor programs -- the Fast Ceramic Reactor (FCR) program, and the Fast Flux Test Reactor (FFTR) program. These programs involved the fabrication and testing of fuel assemblies that utilized plutonium in an oxide form. The types and estimated quantities of waste resulting from these programs are discussed in detail in Section 3.0. A detailed discussion of the packaging and handling procedures used for the VNC radioactive wastes shipped to the Hanford Site is provided in Section 4.0. Section 5.0 provides an in-depth look at this waste including the following: weight and volume of the waste, container types and numbers, physical description of the waste, radiological components, hazardous constituents, and current storage/disposal locations

  4. Radioactive waste shipments to Hanford Retrievable Storage from the General Electric Vallecitos Nuclear Center, Pleasanton, California

    Energy Technology Data Exchange (ETDEWEB)

    Vejvoda, E.J.; Pottmeyer, J.A.; DeLorenzo, D.S.; Weyns-Rollosson, M.I. [Los Alamos Technical Associates, Inc., NM (United States); Duncan, D.R. [Westinghouse Hanford Co., Richland, WA (United States)

    1993-10-01

    During the next two decades the transuranic (TRU) wastes now stored in the burial trenches and storage facilities at the Hanford Site are to be retrieved, processed at the Waste Receiving and Processing Facility, and shipped to the Waste Isolation Pilot Plant near Carlsbad, New Mexico for final disposal. Approximately 3.8% of the TRU waste to be retrieved for shipment to WIPP was generated at the General Electric (GE) Vallecitos Nuclear Center (VNC) in Pleasanton, California and shipped to the Hanford Site for storage. The purpose of this report is to characterize these radioactive solid wastes using process knowledge, existing records, and oral history interviews. The waste was generated almost exclusively from the activities, of the Plutonium Fuels Development Laboratory and the Plutonium Analytical Laboratory. Section 2.0 provides further details of the VNC physical plant, facility operations, facility history, and current status. The solid radioactive wastes were associated with two US Atomic Energy Commission/US Department of Energy reactor programs -- the Fast Ceramic Reactor (FCR) program, and the Fast Flux Test Reactor (FFTR) program. These programs involved the fabrication and testing of fuel assemblies that utilized plutonium in an oxide form. The types and estimated quantities of waste resulting from these programs are discussed in detail in Section 3.0. A detailed discussion of the packaging and handling procedures used for the VNC radioactive wastes shipped to the Hanford Site is provided in Section 4.0. Section 5.0 provides an in-depth look at this waste including the following: weight and volume of the waste, container types and numbers, physical description of the waste, radiological components, hazardous constituents, and current storage/disposal locations.

  5. Project of law relative to the electricity and gas public utilities and to the power and gas companies; Projet de loi relatif au service public de l'electricite et du gaz et aux entreprises electriques et gazieres

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    This document is the definitive text of this project of law adopted by the French house of commons. The aim of this law is to allow the administrations to avoid to use their eligibility right with the opening of the electricity and gas markets to competition. It changes the juridical status of the two public utilities Electricite de France (EdF) and Gaz de France (GdF) into two anonymous companies and creates two additional companies for the management of the power and gas networks. It ensures also the transposition of the European directives from June 26, 2003 (2003/54/CE and 2003/55/CE). It contains some proper dispositions and modifies various existing French laws, in particular the law no. 46-628 from April 8, 1946 about the electricity and gas nationalization and the law no. 2000-108 from February 10, 2000 relative to the modernization and development of the electric public utility. (J.S.)

  6. Resolution 139/012. It authorize to RIO MIRADOR S.A company to generate a wind electricity source by a generating plant located in Maldonado town 5a. Catastral section, as well as the connection to the Interconnected National System

    International Nuclear Information System (INIS)

    2013-01-01

    This Resolution authorizes the generation of electricity using wind energy as the primary electricity source. This project was presented by RIO MIRADOR S.A wind generation company with the proposal to instal an electrical plant in Maldonado town. This authorization is according to the Electric Wholesale Market regulation

  7. Allocation of petroleum feedstock: Baltimore Gas and Electric Company, Sollers Point SNG Plant, Sollers Point, Baltimore County, Maryland. Final environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    Liverman, James L.

    1978-04-01

    An allocation of naphtha feedstock up to 2,186,000 barrels per year to Baltimore Gas and Electric Company (BG and E) to operate its synthetic natural gas (SNG) facility is being considered. The allocation would enable BG and E to produce 10,800,000 mcf of SNG during a 180 day period. Operation of the plant at design capacity is expected to result in annual pollution emissions as follows: 626.4 tons of sulfur oxides, 168.5 tons of nitrogen oxides and 21.6 tons of particulate matter. Incremental emissions due to plant operations relative to existing emissions in Baltimore County are less than 1%. All Federal and State air quality standards should be met. Treated effluent is to be discharged into the Patapasco River where the environmental impacts are not expected to be significant. The SNG facility has been designed to be in compliance with all applicable Federal, State and local effluent standards. Water consumption requirements of 335,000 gallons per day are not expected to significantly tax the area's water resources. Sound generated by the SNG facility will be inaudible or imperceptible. All other operational impacts on land use, population, visual quality, roadways, community facilities and services and ecological systems were judged to be minimal. Environmental impacts resulting from various alternatives ranging from full allocation through denial of an allocation are discussed.

  8. Electric power monthly

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    The Energy Information Administration (EIA) prepares the Electric Power Monthly (EPM) for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. This publication provides monthly statistics for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source, consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead.

  9. Commercial low-Btu coal-gasification plant. Feasibility study: General Refractories Company, Florence, Kentucky. Volume I. Project summary. [Wellman-Galusha

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-11-01

    In response to a 1980 Department of Energy solicitation, the General Refractories Company submitted a Proposal for a feasibility study of a low Btu gasification facility for its Florence, KY plant. The proposed facility would substitute low Btu gas from a fixed bed gasifier for natural gas now used in the manufacture of insulation board. The Proposal from General Refractories was prompted by a concern over the rising costs of natural gas, and the anticipation of a severe increase in fuel costs resulting from deregulation. The proposed feasibility study is defined. The intent is to provide General Refractories with the basis upon which to determine the feasibility of incorporating such a facility in Florence. To perform the work, a Grant for which was awarded by the DOE, General Refractories selected Dravo Engineers and Contractors based upon their qualifications in the field of coal conversion, and the fact that Dravo has acquired the rights to the Wellman-Galusha technology. The LBG prices for the five-gasifier case are encouraging. Given the various natural gas forecasts available, there seems to be a reasonable possibility that the five-gasifier LBG prices will break even with natural gas prices somewhere between 1984 and 1989. General Refractories recognizes that there are many uncertainties in developing these natural gas forecasts, and if the present natural gas decontrol plan is not fully implemented some financial risks occur in undertaking the proposed gasification facility. Because of this, General Refractories has decided to wait for more substantiating evidence that natural gas prices will rise as is now being predicted.

  10. Time horizons and electricity futures: An application of Nicholas Georgescu-Roegen's general theory of economic production

    Energy Technology Data Exchange (ETDEWEB)

    Farrell, Katharine N. [Department of Economics, Helmholtz Centre for Environmental Research - UFZ, Permoserstr. 15, 04318 Leipzig (Germany); Gibson Institute for Land, Food and Environment, Queen' s University of Belfast, Northern Ireland (United Kingdom); Mayumi, Kozo [Faculty of Integrated Arts and Sciences, The University of Tokushima (Japan)

    2009-03-15

    This paper reports theoretical economic production work and uses electricity futures trading to illustrate its argument. The focus is relationships between time, production and tradition both in Nicholas Georgescu-Roegen's analytical representation of the production process (i.e., flow/fund model) and in his dialectical scheme dealing with the evolutionary changes in the economic process. Our main arguments are (1) the flow/fund model is designed to be employed in conjunction with attention to how the boundaries of a given process are determined and (2) process boundaries are dialectical distinctions - between process and not-process - that are strongly related to time and tradition. We propose that Georgescu-Roegen's The Entropy Law and the Economic Process is best understood as the elaboration of a general theory of economic production and we developed two conceptual tools (time {open_square} and meta-funds), both of which are related to the dialectical distinction between process and not-process, which we use to operationalise this general theory. Finally, we demonstrate that, although trading in electricity futures is surprising if one uses a stock/flow vs services distinction (because electricity supply is classed as a service) it appears perfectly logical under Georgescu-Roegen's general theory: shortening time horizons, combined with a shift in the relationship between raw fuel supplies and power production procedures, lead to a shift in the status of electricity supply, from fund to flow. (author)

  11. General classical and quantum-mechanical description of magnetic resonance: an application to electric-dipole-moment experiments

    Energy Technology Data Exchange (ETDEWEB)

    Silenko, Alexander J. [Belarusian State University, Research Institute for Nuclear Problems, Minsk (Belarus); Joint Institute for Nuclear Research, Bogoliubov Laboratory of Theoretical Physics, Dubna (Russian Federation)

    2017-05-15

    A general theoretical description of a magnetic resonance is presented. This description is necessary for a detailed analysis of spin dynamics in electric-dipole-moment experiments in storage rings. General formulas describing a behavior of all components of the polarization vector at the magnetic resonance are obtained for an arbitrary initial polarization. These formulas are exact on condition that the nonresonance rotating field is neglected. The spin dynamics is also calculated at frequencies far from resonance with allowance for both rotating fields. A general quantum-mechanical analysis of the spin evolution at the magnetic resonance is fulfilled and the full agreement between the classical and quantum-mechanical approaches is shown. Quasimagnetic resonances for particles and nuclei moving in noncontinuous perturbing fields of accelerators and storage rings are considered. Distinguishing features of quasimagnetic resonances in storage ring electric-dipole-moment experiments are investigated in detail. The exact formulas for the effect caused by the electric dipole moment are derived. The difference between the resonance effects conditioned by the rf electric-field flipper and the rf Wien filter is found and is calculated for the first time. The existence of this difference is crucial for the establishment of a consent between analytical derivations and computer simulations and for checking spin tracking programs. The main systematical errors are considered. (orig.)

  12. Hazardous Waste Cleanup: General Electric – Main Plant Site in Schenectady, New York

    Science.gov (United States)

    GE purchased the property at Genesee Street in 1951 and constructed a manufacturing plant that produced a variety of electrical components including radar equipment, printed circuit boards and high voltage semiconductors. In January 1986, Powerex, Inc., ac

  13. Hazardous Waste Cleanup: General Electric - Auburn Plant in Auburn, New York

    Science.gov (United States)

    GE purchased the property at Genesee Street in 1951 and constructed a manufacturing plant that produced a variety of electrical components including radar equipment, printed circuit boards and high voltage semiconductors. In January 1986, Powerex, Inc.,

  14. Conclusion: The balanced company

    DEFF Research Database (Denmark)

    Scheuer, John Damm; Jensen, Inger

    2013-01-01

    This concluding chapter brings together the various research findings of the book "The balanced company - organizing for the 21st Century" and develops a general overview of their implications for our understanding of the balancing processes unfolding in companies and organizations....

  15. Description of CRIB, the GIPSY retrieval mechanism, and the interface to the General Electric MARK III Service : CRIB, the mineral resources data bank of the U.S. Geological Survey--guide for public users, 1977

    Science.gov (United States)

    Calkins, James Alfred; Keefer, Eleanor K.; Ofsharick, Regina A.; Mason, George T.; Tracy, Patricia; Atkins, Mary

    1978-01-01

    The U.S. Geological Survey's Computerized Resources Information Bank (CRIB) is being made available for public use through the computer facilities of the University of Oklahoma and the General Electric Company, U.S.A. The use of General Electric's worldwide information-services network provides access to the CRIB file to a worldwide clientele. This manual, which consists of two chapters, is intended as a guide to users who wish to interrogate the file. Chapter A contains a description of the CRIB file, information on the use of the GIPSY retrieval system, and a description of the General Electric MARK III Service. Chapter B contains a description of the individual data items in the CRIB record as well as code lists. CRIB consists of a set of variable-length records on the metallic and nonmetallic mineral resources of the United States and other countries. At present, 31,645 records in the master file are being made available. The record contains information on mineral deposits and mineral commodities. Some topics covered are: deposit name, location, commodity information, description of deposit, geology, production, reserves, potential resources, and references. The data are processed by the GIPSY program, which maintains the data file and builds, updates, searches, and prints the records using simple yet versatile command statements. Searching and selecting records is accomplished by specifying the presence, absence, or content of any element of information in the record; these specifications can be logically linked to prepare sophisticated search strategies. Output is available in the form of the complete record, a listing of selected parts of the record, or fixed-field tabulations. The General Electric MARK III Service is a computerized information services network operating internationally by land lines, satellites, and undersea cables. The service is available by local telephone to 500 cities in North America, Western Europe, Australia, Southeast Asia, Japan

  16. Results of the scientific and humanitarian projects supported by the German electricity companies (VDEW e.V.) after the Chernobyl accident

    International Nuclear Information System (INIS)

    Pfob, H.; Heinemann, G.

    2000-01-01

    The German Electricity Companies, organized by VDEW e.V., tried to support in manifold ways the areas and people affected by the Chernobyl accident in their management of the situation. Apart from their prompting numerous help projects of the German public; we must mention three efforts especially: 1. the program for partnership in security matters initiated by the German nuclear power plants has been serving a quick and efficient support of the Eastern European plants since 1990- parallel to the efforts on a European level (strategic exchange of views of the experts concerned, consultation and training on the management level, optimization of training programs). 2: the project [Scientists Help Chernobyl Children] of the Joint Committee for Radiation Research (GAST), an union of the scientific societies working on radiation research in Germany under the chairmanship of Prof. Reiners (Essen/Wuerzburg) in cooperation with Prof. Streffer (Essen), Dr. Parezke (Munich), Dr. Heinemann (Hannover) and Dr. Pfob (Karlsruhe), aims to give humanitarian and scientific help for children ill with thyroid cancer in Belarus. Therapy and training, molecular biological examinations, dosimetry, and risk evaluation, as well as consultation and coordination in Minsk are parts of the project. 3: the project of the Radiation Cytogenetics Association (RCA) under the chairmanship of Prof. Bauchinger (GSF Muenchen) has been giving coordinated help with biological dosimetry to institutions and scientist in the states of the former USSR. Through retrospective biological dosimetry, especially the employment of the FISH (fluorescence in situ hybridization)-technology for the assessment of so-called stable translocations, both individual and population doses were analyzed. All three of these projects, even if to a different extent, have been leading to new and unique results up to the present day. Especially the GAST-project has been marked to a high extent by its humanitarian help for the

  17. Smart Companies.

    Science.gov (United States)

    Galagan, Patricia A.

    1997-01-01

    Capturing and leveraging knowledge is an important new management trend that is as yet undefined. Some companies are accounting for their intellectual capital and applying it to the company balance sheets. (JOW)

  18. Electric Company - Medium Voltage Substations

    OpenAIRE

    MacCosham, Spencer

    2014-01-01

    The capstone project goal was to recommend ways to increase sales of our client’s product by a factor of 10. The core of our project included researching and analyzing the client’s “Model III” package-unit-substations. Specifically, the project objectives were two-fold: First, we were to conduct market research and data analysis on package unit substations in North America. We needed to identify sales channels, competitors, potential substitutes, etc. Second, we were to identify market/channe...

  19. Manufacturing cost analysis of a parabolic dish concentrator (General Electric design) for solar thermal electric power systems in selected production volumes

    Science.gov (United States)

    1981-01-01

    The manufacturing cost of a General Electric 12 meter diameter concentrator was estimated. This parabolic dish concentrator for solar thermal system was costed in annual production volumes of 100 - 1,000 - 5,000 - 10,000 - 50,000 100,000 - 400,000 and 1,000,000 units. Presented for each volume are the costs of direct labor, material, burden, tooling, capital equipment and buildings. Also presented is the direct labor personnel and factory space requirements. All costs are based on early 1981 economics.

  20. Electricity

    International Nuclear Information System (INIS)

    Tombs, F.

    1983-01-01

    The subject is discussed, with particular reference to the electricity industry in the United Kingdom, under the headings; importance and scope of the industry's work; future fuel supplies (estimated indigenous fossil fuels reserves); outlook for UK energy supplies; problems of future generating capacity and fuel mix (energy policy; construction programme; economics and pricing; contribution of nuclear power - thermal and fast reactors; problems of conversion of oil-burning to coal-burning plant). (U.K.)

  1. Competition and regulation in the European network industries. From general case to the case of electricity

    International Nuclear Information System (INIS)

    Jonquieres, F.

    1995-01-01

    The paper focuses on the institutional arrangements present situation in the European Electricity Supply Industry, which is characterized by its diversity. There is unquestionably, a trend to put pressure on the national electricity systems by the European Union organisms to accept the unbundling, Third Party Access to the network, deregulation etc. An opposing reaction appears, trying to underline the potential important drawbacks of such a trend. The conclusion of the author can be summarised as follows: Competition at the generation level? Yes[ Access to the network ? No[ (author)

  2. The strategic ''pull'' and operational ''push'' of total quality management in UK regional electricity service companies

    Energy Technology Data Exchange (ETDEWEB)

    McAdam, R.; McLean, J.; Henderson, J.

    2003-04-30

    The aim of this paper is to evaluate whether the UK regional electricity companies (RECs) has used total quality management (TQM) as a ''push'' or as a ''pull'' change methodology. ''Push'' is the operational improvement role of TQM; ''pull'' is the strategic or direction giving, improvement role of TQM. Following the onset of privatisation in 1990 there has been evidence of the RECs adopting TQM in both ''push'' and ''pull'' methodologies with varying degrees of success. An evaluation of the change processes involved will enable improved change models to be developed leading to increased business effectiveness in this 30 billion pounds sterling industry. Other possible benefits include the possible generalisations to other utilities such as water, roads, gas and telecoms. The research methodology includes a comparative case study analysis of five RECs, which have used TQM as their overarching approach to change. One of the cases is analysed to a more in-depth level based on the multiple case findings. The findings indicate that the ''push-pull'' analysis enables the full range of TQM activities to be evaluated in the RECs studied. Overall, there is a need to have a balanced portfolio of operational or ''push''-based TQM activity that is driven by strategic or ''pull'' based TQM planning and activity. (author)

  3. Portfolio optimization in electricity markets

    International Nuclear Information System (INIS)

    Liu, Min; Wu, Felix F.

    2007-01-01

    In a competitive electricity market, Generation companies (Gencos) face price risk and delivery risk that affect their profitability. Risk management is an important and essential part in the Genco's decision making. In this paper, risk management through diversification is considered. The problem of energy allocation between spot markets and bilateral contracts is formulated as a general portfolio optimization problem with a risk-free asset and n risky assets. Historical data of the PJM electricity market are used to demonstrate the approach. (author)

  4. Chapter 3. The economical power of the company

    International Nuclear Information System (INIS)

    1998-01-01

    In the third chapter of this CD ROM the economic power of the Slovak Electric, Plc. (Slovenske elektrarne, a.s.), is presented. It consist of next paragraphs (1) Property of Slovak Electric, Plc, the company; (2) Position of the Company; (3) Business performance of the Company (Economic results, Installed capacity, Generation of electricity and heat; Electricity trade, Distribution of electricity and heat trade are reviewed); (4) Shareholdings in other companies and international co-operation

  5. Organizational architecture of multinational company

    OpenAIRE

    Vrbová, Tereza

    2012-01-01

    The Bachelor's Thesis ,,Organizational architecture of multinational company" sets the target to analyse organizational structures used in multinational companies at present. In the teoretical section is briefly described development of this subject, basic concepts associated with organizational architecture such as globalization, multinational companies and organizational architecture. I also generalized main characteristics of organizational forms and describe their pros and cons. The pract...

  6. Concepts of investment risks and strategies in electricity generation

    International Nuclear Information System (INIS)

    De Joode, J.; Boots, M.G.

    2005-06-01

    This report deals with the specific investment risks in electricity generation and discusses the problems associated with energy investments in general and focus on the additional or changing risks resulting from electricity market liberalisation. The focus is on (1) risks under the control of the electricity company, and on (2) market risks, such as the risk of price changes. Ultimately, some of the approaches and strategies that enable electricity producers to counter or mitigate these risks are discussed

  7. Scottish Nuclear, the company

    International Nuclear Information System (INIS)

    Yeomans, R.M.

    1991-01-01

    A former chief executive of Scottish Nuclear, formed when United Kingdom electricity generation was privatized, describes the financial viability of the company and considers the future of nuclear power. Scottish Nuclear owns and operates the Advanced Gas Cooled (AGR) and Magnox reactors at Hunterston and the AGR reactor at Torness and is a separate company from those dealing with hydro-electric and non-nuclear generation of electricity. Costs of running the reactors is identified as a proportion of the whole for certain key issues such as station costs, depreciation, decommissioning and insurance. While nuclear power generation using outmoded Magnox reactors is costly, the ecological cost of global warming is seen as more of a problem. Future policy for nuclear power in Scotland must include new plant, probably pressurized water reactors and a clear policy of safety enhancement. (UK)

  8. Straight and chopped dc performance data for a Prestolite MTC-4001 motor and a general electric EV-1 controller

    Science.gov (United States)

    Edie, P. C.

    1981-01-01

    Performance data on the Prestolite MTC-4001 series wound dc motor and General Electric EV-1 Chopper Controller is supplied for the electric vehicle manufacturer. Data are provided for both straight and chopped dc input to the motor, at 2 motor temperature levels. Testing was done at 6 voltage increments to the motor, and 2 voltage increments to the controller. Data results are presented in both tabular and graphical forms. Tabular information includes motor voltage and current input data, motor speed and torque output data, power data and temperature data. Graphical information includes torque-speed, motor power output-speed, torque-current, and efficiency-speed plots under the various operating conditions. The data resulting from this testing show the speed-torque plots to have the most variance with operating temperature. The maximum motor efficiency is between 76% and 82%, regardless of temperature or mode of operation.

  9. 17 CFR 250.12 - Exemption of certain public utility companies from the definition of subsidiary companies of...

    Science.gov (United States)

    2010-04-01

    ... utility companies from the definition of subsidiary companies of holding companies. 250.12 Section 250.12... REGULATIONS, PUBLIC UTILITY HOLDING COMPANY ACT OF 1935 Registration and General Exemptions § 250.12 Exemption of certain public utility companies from the definition of subsidiary companies of holding companies...

  10. Operational experience in the non-destructive assay of fissile material in General Electric's nuclear fuel fabrication facility

    International Nuclear Information System (INIS)

    Stewart, J.P.

    1976-01-01

    Operational experience in the non-destructive assay of fissile material in a variety of forms and containers and incorporation of the assay devices into the accountability measurement system for General Electric's Wilmington Fuel Fabrication Facility measurement control programme is detailed. Description of the purpose and related operational requirements of each non-destructive assay system is also included. In addition, the accountability data acquisition and processing system is described in relation to its interaction with the various non-destructive assay devices and scales used for accountability purposes within the facility. (author)

  11. Generalized Energy Flow Analysis Considering Electricity Gas and Heat Subsystems in Local-Area Energy Systems Integration

    Directory of Open Access Journals (Sweden)

    Jiaqi Shi

    2017-04-01

    Full Text Available To alleviate environmental pollution and improve the efficient use of energy, energy systems integration (ESI—covering electric power systems, heat systems and natural gas systems—has become an important trend in energy utilization. The traditional power flow calculation method, with the object as the power system, will prove difficult in meeting the requirements of the coupled energy flow analysis. This paper proposes a generalized energy flow (GEF analysis method which is suitable for an ESI containing electricity, heat and gas subsystems. First, the models of electricity, heat, and natural gas networks in the ESI are established. In view of the complexity of the conventional method to solve the gas network including the compressor, an improved practical equivalent method was adopted based on different control modes. On this basis, a hybrid method combining homotopy and the Newton-Raphson algorithm was executed to compute the nonlinear equations of GEF, and the Jacobi matrix reflecting the coupling relationship of multi-energy was derived considering the grid connected mode and island modes of the power system in the ESI. Finally, the validity of the proposed method in multi-energy flow calculation and the analysis of interacting characteristics was verified using practical cases.

  12. Electric power monthly, May 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-05-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data in this report are presented for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. This publication provides monthly statistics for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Statistics by company and plant are published on the capability of new generating units, net generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost of fossil fuels.

  13. Environmental performance assessment of a company of aluminum surface treatment

    Directory of Open Access Journals (Sweden)

    Susan Catieri Ramalho

    2013-08-01

    Full Text Available The purpose of this article was to evaluate the environmental performance of a medium-sized company that provides services for surface treatment of aluminum. The treatment is known as anodizing. The research method was qualitative numerical modeling. The environmental performance of the company was organized into five constructs: atmosphere, wastewater, energy and natural resources, solid waste, and legislation and management. Nineteen indicators were chosen to explain the five constructs. Ten employees of the company prioritized the constructs and evaluated the situation of the indicators by means of a scale of assessment. By means of a mathematical model, the general performance of the environmental operation was calculated at 74.5% of the maximum possible. The indicators that most contributed to the performance not to reach 100% were consumption of electricity and water consumption. The construct of worse performance was natural and energy resources. These are the priorities for future environmental improvement actions that the company may promote.

  14. The validity of the general similarity law for electrical breakdown of gases

    International Nuclear Information System (INIS)

    Osmokrovic, Predrag; Zivic, Tamara; Loncar, Boris; Vasic, Aleksandra

    2006-01-01

    This paper investigates the validity of the similarity law in cases of dc and pulse breakdown of gases. Geometrically similar systems insulated with SF 6 gas were used during experiments. It is shown that the similarity law is valid for dc breakdown voltage if the electron mean free path is included in geometrical parameters of the system, but not for pulse breakdown voltages. The explanation for this is the mechanism of the pulse discharge. The similarity law was expanded to take into account mechanisms of pulse breakdown initiation. Thus, the general similarity law is obtained, the validity of which in case of a pulse breakdown is established experimentally

  15. Relativistic two-fermion problem with the most general electric and magnetic potentials

    International Nuclear Information System (INIS)

    Yilmazer, A.U.

    1986-01-01

    The energy equation of two spin-1/2 particles interacting with their charges and anomalous magnetic moments is examined. Starting with the most general Hamiltonian already obtained by other authors, the relevant wave equation has been written in terms of the generators of the de Sitter group. The radial equations for four different two-fermion systems are derived and the positronium case is studied in detail. Their bound state solutions are discussed and the similarity to the sixteen radial equations arrived at by other authors in completely different manner is pointed out. (author)

  16. Project of law modified by the Senate relative to the electric and gas public utilities and to the electric and gas companies; Projet de loi modifie par le Senat relatif au service public de l'electricite et du gaz et aux entreprises electriques et gazieres

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    This project of law aims to adapt the electricity and gas sector to the new economical context of opening of the energy markets to competition. It gives to energy companies the internal organization base necessary to warrant a high level of service and a transparent and non-discriminatory access of third parties to transport and distribution networks. These evolutions will allow Electricite de France (EdF) and Gaz de France (GdF) companies to compete on equal terms with their European competitors. It confirms first the prime role of public utility of both companies and then transposes the dispositions of the European directives relative to the organization of EdF and GdF integrated companies. It foresees the creation of two daughter companies for the management of energy transport activities. The project of law foresees also the change of the status of EdF and GdF companies and the reform of the retirement pensions of the personnel. This report presents the modifications added by the Senate to the text of law adopted at first reading by the House of Commons. (J.S.)

  17. Asymmetric kinetic equilibria: Generalization of the BAS model for rotating magnetic profile and non-zero electric field

    Science.gov (United States)

    Dorville, Nicolas; Belmont, Gérard; Aunai, Nicolas; Dargent, Jérémy; Rezeau, Laurence

    2015-09-01

    Finding kinetic equilibria for non-collisional/collisionless tangential current layers is a key issue as well for their theoretical modeling as for our understanding of the processes that disturb them, such as tearing or Kelvin Helmholtz instabilities. The famous Harris equilibrium [E. Harris, Il Nuovo Cimento Ser. 10 23, 115-121 (1962)] assumes drifting Maxwellian distributions for ions and electrons, with constant temperatures and flow velocities; these assumptions lead to symmetric layers surrounded by vacuum. This strongly particular kind of layer is not suited for the general case: asymmetric boundaries between two media with different plasmas and different magnetic fields. The standard method for constructing more general kinetic equilibria consists in using Jeans theorem, which says that any function depending only on the Hamiltonian constants of motion is a solution to the steady Vlasov equation [P. J. Channell, Phys. Fluids (1958-1988) 19, 1541 (1976); M. Roth et al., Space Sci. Rev. 76, 251-317 (1996); and F. Mottez, Phys. Plasmas 10, 1541-1545 (2003)]. The inverse implication is however not true: when using the motion invariants as variables instead of the velocity components, the general stationary particle distributions keep on depending explicitly of the position, in addition to the implicit dependence introduced by these invariants. The standard approach therefore strongly restricts the class of solutions to the problem and probably does not select the most physically reasonable. The BAS (Belmont-Aunai-Smets) model [G. Belmont et al., Phys. Plasmas 19, 022108 (2012)] used for the first time the concept of particle accessibility to find new solutions: considering the case of a coplanar-antiparallel magnetic field configuration without electric field, asymmetric solutions could be found while the standard method can only lead to symmetric ones. These solutions were validated in a hybrid simulation [N. Aunai et al., Phys. Plasmas (1994-present) 20

  18. Asymmetric kinetic equilibria: Generalization of the BAS model for rotating magnetic profile and non-zero electric field

    International Nuclear Information System (INIS)

    Dorville, Nicolas; Belmont, Gérard; Aunai, Nicolas; Dargent, Jérémy; Rezeau, Laurence

    2015-01-01

    Finding kinetic equilibria for non-collisional/collisionless tangential current layers is a key issue as well for their theoretical modeling as for our understanding of the processes that disturb them, such as tearing or Kelvin Helmholtz instabilities. The famous Harris equilibrium [E. Harris, Il Nuovo Cimento Ser. 10 23, 115–121 (1962)] assumes drifting Maxwellian distributions for ions and electrons, with constant temperatures and flow velocities; these assumptions lead to symmetric layers surrounded by vacuum. This strongly particular kind of layer is not suited for the general case: asymmetric boundaries between two media with different plasmas and different magnetic fields. The standard method for constructing more general kinetic equilibria consists in using Jeans theorem, which says that any function depending only on the Hamiltonian constants of motion is a solution to the steady Vlasov equation [P. J. Channell, Phys. Fluids (1958–1988) 19, 1541 (1976); M. Roth et al., Space Sci. Rev. 76, 251–317 (1996); and F. Mottez, Phys. Plasmas 10, 1541–1545 (2003)]. The inverse implication is however not true: when using the motion invariants as variables instead of the velocity components, the general stationary particle distributions keep on depending explicitly of the position, in addition to the implicit dependence introduced by these invariants. The standard approach therefore strongly restricts the class of solutions to the problem and probably does not select the most physically reasonable. The BAS (Belmont-Aunai-Smets) model [G. Belmont et al., Phys. Plasmas 19, 022108 (2012)] used for the first time the concept of particle accessibility to find new solutions: considering the case of a coplanar-antiparallel magnetic field configuration without electric field, asymmetric solutions could be found while the standard method can only lead to symmetric ones. These solutions were validated in a hybrid simulation [N. Aunai et al., Phys. Plasmas (1994-present

  19. Non-electrical Application of Nuclear Energy: Some General Issues and Prospects

    International Nuclear Information System (INIS)

    Kuznetsov, Yu. N.

    2008-01-01

    effective NDC structure allowing extraction of turbine steam to supply heat (via an intermediate circuit) to a desalination system producing a high-quality distillate. A nuclear plant consisting of two VK-300 facilities can supply heat to a desalination complex with the output of 300.000 m 3 /day, which allows distillate production at a cost of 0.58 dollars/m 3 . In this case, 357 MWe can be used to produce electricity at a cost of 0.029 dollars/kWh. The cost estimates have demonstrated that nuclear desalination facilities with RUTA reactors would be competitive with fossil fuel plants of the same capacity in the regions relying on expensive imported fuel. Another technology that offers a wide range of non-electricity applications is high-temperature gas cooled reactor (HTGR). The paper discusses HTGR application for production of synthesis gas (mixture of CO and H 2 ) by way of black and slate coal gasification, in radiation and chemical processes (such as polymerization of polyethylene, organic concrete, etc.), and in hydrogen production (steam conversion of methyl hydride, high-temperature electrolysis of water, thermochemical cycle). This seems to be the most expedient way - technically and economically - of HTGR application.(author)

  20. Electricity supply

    International Nuclear Information System (INIS)

    Rezendes, V.S.

    1991-10-01

    This report focuses on the Securities and Exchange Commission's (SEC) administration of the Public Utility Holding Company Act of 1935, intended to protect the public, investors, and consumers from abuses associated with the control of electric and gas utility companies through the holding company structure. These abuses include subjecting subsidiary utilities to excessive charges for services, construction work, and materials; frustrating effective state regulation through the holding company structure; and overloading subsidiary utilities with debt to prevent voluntary rate reductions. GAO discusses industry changes during the past decade involving electric utility holding companies; SEC's regulatory response to such changes; and the relationship between SEC, the Federal Energy Regulatory Commission, and states in protecting consumer and investor interests in light of these changes

  1. Zenn Motor Company

    Energy Technology Data Exchange (ETDEWEB)

    Clifford, I. [Zenn Motor Company, Toronto, ON (Canada)

    2010-07-01

    Zenn Motor company is a leader in the electric vehicle space and builds and markets a low speed vehicle known as the zero emission, no noise (ZENN). This presentation provided background information on the Zenn Motor Company as well as on EEStor, a company that develops four-wheeled vehicles and that is seeking partners to fund the development for a modified barium titanate-based ultracapacitor. In 2004, ZENN entered into a technology agreement with EEStor that secured certain exclusive and non-exclusive rights to purchase and deploy EEStor's EESU technology as part of its ZENNergy solutions in several markets, including exclusive rights for new four-passenger vehicles with a curb weight of up to 1,400 kilograms; exclusive rights for the neighbourhood electric vehicles (NEV) and golf carts market; exclusive rights for utility vehicles; and exclusive rights for the aftermarket conversion to ZENNergy of any four-wheeled vehicles. The presentation also addressed ZENNergy and the art of integrating high energy drive solutions. Lessons learned and EEStor's technology attributes were discussed. A hypothetical case study was also offered. The presentation concluded with a discussion of EEStor technology status and opportunity horizons. It was concluded that a better battery is needed to enable the mass adoption of electric vehicles. tabs.

  2. Optimal Topology and Experimental Evaluation of Piezoelectric Materials for Actively Shunted General Electric Polymer Matrix Fiber Composite Blades

    Science.gov (United States)

    Choi, Benjamin B.; Duffy, Kirsten; Kauffman, Jeffrey L.; Kray, Nicholas

    2012-01-01

    NASA Glenn Research Center, in collaboration with GE Aviation, has begun the development of a smart adaptive structure system with piezoelectric (PE) transducers to improve composite fan blade damping at resonances. Traditional resonant damping approaches may not be realistic for rotating frame applications such as engine blades. The limited space in which the blades reside in the engine makes it impossible to accommodate the circuit size required to implement passive resonant damping. Thus, a novel digital shunt scheme has been developed to replace the conventional electric passive shunt circuits. The digital shunt dissipates strain energy through the load resistor on a power amplifier. General Electric (GE) designed and fabricated a variety of polymer matrix fiber composite (PMFC) test specimens. Investigating the optimal topology of PE sensors and actuators for each test specimen has revealed the best PE transducer location for each target mode. Also a variety of flexible patches, which can conform to the blade surface, have been tested to identify the best performing PE patch. The active damping control achieved significant performance at target modes. This work has been highlighted by successful spin testing up to 5000 rpm of subscale GEnx composite blades in Glenn s Dynamic Spin Rig.

  3. GenLocDip: A Generalized Program to Calculate and Visualize Local Electric Dipole Moments.

    Science.gov (United States)

    Groß, Lynn; Herrmann, Carmen

    2016-09-30

    Local dipole moments (i.e., dipole moments of atomic or molecular subsystems) are essential for understanding various phenomena in nanoscience, such as solvent effects on the conductance of single molecules in break junctions or the interaction between the tip and the adsorbate in atomic force microscopy. We introduce GenLocDip, a program for calculating and visualizing local dipole moments of molecular subsystems. GenLocDip currently uses the Atoms-In-Molecules (AIM) partitioning scheme and is interfaced to various AIM programs. This enables postprocessing of a variety of electronic structure output formats including cube and wavefunction files, and, in general, output from any other code capable of writing the electron density on a three-dimensional grid. It uses a modified version of Bader's and Laidig's approach for achieving origin-independence of local dipoles by referring to internal reference points which can (but do not need to be) bond critical points (BCPs). Furthermore, the code allows the export of critical points and local dipole moments into a POVray readable input format. It is particularly designed for fragments of large systems, for which no BCPs have been calculated for computational efficiency reasons, because large interfragment distances prevent their identification, or because a local partitioning scheme different from AIM was used. The program requires only minimal user input and is written in the Fortran90 programming language. To demonstrate the capabilities of the program, examples are given for covalently and non-covalently bound systems, in particular molecular adsorbates. © 2016 Wiley Periodicals, Inc. © 2016 Wiley Periodicals, Inc.

  4. Safety Evaluation Report related to the operation of Wm. H. Zimmer Nuclear Power Station, Unit No. 1. Docket No. 50-358. Cincinnati Gas and Electric Company

    International Nuclear Information System (INIS)

    1982-08-01

    Information is presented concerning site characteristics; design criteria for structures, systems, and components; reactor; reactor coolant system and connected systems; engineered safety features; instrumentation and controls; electric power; auxiliary systems; conduct of operations; and TMI-2 requirements

  5. Determination of the Regulatory Asset Base of power distribution companies. Background report of 'Guidelines for price cap regulation in the Dutch electricity sector'

    International Nuclear Information System (INIS)

    Tjin, T.; Buitelaar, T.

    2000-02-01

    July 1999 The Netherlands Electricity Regulatory Service (DtE) published an Information and Consultation Document on the subject of 'Price Cap Regulation in the Dutch Electricity Sector'. By means of price cap regulation tariffs are determined such that businesses are stimulated continuously to organize their total processes and operation as efficient as possible. In the consultation document a large number of questions with respect to the future organization and planning of the system of economic regulation of the electricity sector in the Netherlands can be found. Many reactions and answers were received, compiled and analyzed. The results are presented in the main report, which forms the framework for the DtE to shape the economic regulation of the Dutch electricity sector. In this background document attention is paid to a method to determine the Regulatory Asset Base (RAB)

  6. Correlation between electrical and magnetic properties of phase-separated manganites studied with a general effective medium model

    International Nuclear Information System (INIS)

    Sacanell, J.; Quintero, M.; Parisi, F.; Ghivelder, L.; Leyva, A.G.; Levy, P.

    2007-01-01

    We have performed electrical resistivity and DC magnetization measurements as a function of temperature, on polycrystalline samples of phase-separated La 5/8- y Pr y Ca 3/8 MnO 3 (y=0.3). We have used the general effective medium theory to obtain theoretical resistivity vs. temperature curves corresponding to different fixed ferromagnetic (FM) volume fraction values, assuming that the sample is a mixture of typical metallic-like and insulating manganites. By comparing this data with our experimental resistivity curves we have obtained the relative FM volume fraction of our sample as a function of temperature. This result matches with the corresponding magnetization data in excellent agreement, showing that a mixed-phase scenario is the key element to explain both the magnetic and transport properties in the present compound

  7. Preparing Canada's power systems for transition to the year 2000 : Y2K readiness assessment results for Canadian electric utility companies : first quarter 1999

    International Nuclear Information System (INIS)

    1999-01-01

    The effort made by Canadian electric utilities to minimize any power disruptions during the year 2000 (Y2K) transition is discussed and the state of readiness of the electric power industry with respect to the Y2K computer challenge is outlined. Canadian utilities started addressing Y2K issues several years ago, and today, reports show that every major electric utility in Canada is either on, or ahead of schedule to meet the industry established milestones for Y2K readiness. This report includes the assessment of all of Canada's large electric utilities, plus about 95 per cent of Canada's small distribution utilities. On average, the bulk electric utilities in Canada expect to be Y2K ready by mid-June 1999. This means that equipment and systems will operate properly for all dates including Y2K, or that there will be an operating strategy in place to mitigate the effects of any improper operations of equipment or systems. In terms of overall preparations for Y2K, Canada is ahead of the North American averages. Bulk electric utilities for non-nuclear generation are now 100 per cent complete in the inventory phase, 99 per cent complete in the assessment phase, and 91 per cent complete in the remediation/testing phase. For nuclear generation, completion rates are the same except for the remediation/testing phase which is 97 per cent complete. 1 tab., 21 figs

  8. Company analysis

    DEFF Research Database (Denmark)

    Jenster, Per V.; Hussey, David

    This volume looks at the company appraisal as a whole, examining the continuing need to appraise companies as part of the continuing strategy process. Building from a sound basis of theory, the text aims to be practical and to give guidance to senior managers and others involved in the strategy...... process. It is thus a book primarily aimed at managers, but should also be useful for MBA students undertaking strategy assignments It provides helpful, practical guidance and identifies weaknesses of traditional methods. It also presents a variety of tools which may be used in the appraisal process...

  9. The "Forgotten" Pseudomomenta and Gauge Changes in Generalized Landau Level Problems: Spatially Nonuniform Magnetic and Temporally Varying Electric Fields

    Science.gov (United States)

    Konstantinou, Georgios; Moulopoulos, Konstantinos

    2017-05-01

    By perceiving gauge invariance as an analytical tool in order to get insight into the states of the "generalized Landau problem" (a charged quantum particle moving inside a magnetic, and possibly electric field), and motivated by an early article that correctly warns against a naive use of gauge transformation procedures in the usual Landau problem (i.e. with the magnetic field being static and uniform), we first show how to bypass the complications pointed out in that article by solving the problem in full generality through gauge transformation techniques in a more appropriate manner. Our solution provides in simple and closed analytical forms all Landau Level-wavefunctions without the need to specify a particular vector potential. This we do by proper handling of the so-called pseudomomentum ěc {{K}} (or of a quantity that we term pseudo-angular momentum L z ), a method that is crucially different from the old warning argument, but also from standard treatments in textbooks and in research literature (where the usual Landau-wavefunctions are employed - labeled with canonical momenta quantum numbers). Most importantly, we go further by showing that a similar procedure can be followed in the more difficult case of spatially-nonuniform magnetic fields: in such case we define ěc {{K}} and L z as plausible generalizations of the previous ordinary case, namely as appropriate line integrals of the inhomogeneous magnetic field - our method providing closed analytical expressions for all stationary state wavefunctions in an easy manner and in a broad set of geometries and gauges. It can thus be viewed as complementary to the few existing works on inhomogeneous magnetic fields, that have so far mostly focused on determining the energy eigenvalues rather than the corresponding eigenkets (on which they have claimed that, even in the simplest cases, it is not possible to obtain in closed form the associated wavefunctions). The analytical forms derived here for these

  10. An econometric analysis of a regional power company and evaluation of its investment policies by using optimal control technique: The case of New York State Electric and Gas Corporation

    Science.gov (United States)

    Guney, Esat Serhat

    1997-12-01

    This study, in its first part, explores the basic parameters of a power market in a utility district. The analysis of this market, naturally, includes a demand and a supply side and the interactions between the two. The econometric model is built to simulate the system of operations of one specific utility company, namely NYSEG (New York State Electric & Gas Corporation), one of seven major Investor-Owned-Utility Companies in New York State. The company serves about 17,000 square miles, or more than one third of the state's land, and one tenth of its population. The study uses time-series data covering 1960 to 1994 for more than fifty variables. The econometric analysis performs both single equation and system estimations and yields short-run vs. long-run and direct vs. total elasticity estimates, which are crucial for any producer in the market place. In the second part of this research, an optimal control procedure is used to evaluate NYSEG's investment policies retrospectively. For control calculations, a simplified linear version of the system of equations is used. Due to its constrained nature (both by being linear and having low degrees of freedom), the optimal control component mainly serves as an educational tool in microeconomic modeling. Lastly, we performed Exploratory Data Analysis for the data we employed. This was done to justify the use of certain parametric test procedures performed in the process basically by checking whether the implicit assumptions of normality and the randomness hold.

  11. [Effects of the renal blood flow at different levels by transcutaneous electrical acupoint stimulation combined general anesthesia induced controlled hypotension].

    Science.gov (United States)

    Fang, Jian-Qiao; Zhang, Le-Le; Shao, Xiao-Mei

    2012-11-01

    To observe the intervention of transcutaneous electrical acupoint stimulation (TEAS) on the renal blood flow at different levels of mean arterial pressure (MAP) in controlled hypotension. Forty-two male beagle dogs were randomly divided into seven groups, i. e., the general anesthesia group, the 50% controlled group, the 40% controlled group, the 30% controlled group, the 50% experimental group, the 40% experimental group, and the 30% experimental group, 6 in each group. Beagles in the general anesthesia group were not treated with controlled hypotension, and the target MAP was achieved in those of the rest groups and maintained for 60 min. In the experimental groups, TEAS was applied to bilateral Hegu (LI4), Zusanli (ST36), Sanyinjiao (SP6), and Quchi (LI11) at 2/100 Hz with the stimulation strength of (4 +/- 1) mA starting from the stability of their physiological conditions to 60 min of maintaining the target MAP level. The changes of the renal blood flow were monitored at different time points using laser Doppler. From starting pressure control to the target MAP level, the renal blood flow was significantly lower in the 30% controlled group than in the general anesthesia group and the basic level of the same group (P blood pressure, the renal blood flow was significantly lower in the 50% controlled group, the 40% controlled group, the 30% controlled group, and the 30% experimental group than in the general anesthesia group (P blood pressure recovery, the renal blood flow restored to the basic level in the 50% controlled group, the 50% experimental group, and the 40% experimental group (P > 0.05), while it was not restored to the basic level in the 40% controlled group, the 30% controlled group, and the 30% experimental group (P renal blood flow, thus protecting the kidney.

  12. Analysis of electricity price in Danish competitive electricity market

    DEFF Research Database (Denmark)

    Hu, Weihao; Chen, Zhe; Bak-Jensen, Birgitte

    2012-01-01

    electricity markets in some ways, is chosen as the studied power system. 10 year actual data from the Danish competitive electricity market are collected and analyzed. The relationship among the electricity price (both the spot price and the regulation price), the consumption and the wind power generation...... in an electricity market is investigated in this paper. The spot price and the regulation price generally decrease when the wind power penetration in the power system increases or the consumption of the power system decreases. The statistical characteristics of the spot price and the regulation price for different...... consumption periods and wind power penetration are analyzed. Simulation results show that the findings of this paper are useful for wind power generation companies to make the optimal bidding strategy so that the imbalance cost of trading wind power on the electricity market could be reduced....

  13. Introduction of the information system research and development department at Kansai Electric Power Company. Company uses the latest information processing technology to respond to customers' needs to structure an information system; Kanden joho system no kenkyu kaihatsu bumon no shokai. Saishin no joho shori gijutsu ni yori, okyakusama no joho system ka no needs ni okotaeshimasu

    Energy Technology Data Exchange (ETDEWEB)

    Ashida, Y. [Kansai Electric Power Co. Inc., Osaka (Japan)

    1998-12-10

    This paper introduces the research and development on the information processing technology at the Kansai Electric Power Company. In the research of a system development technology utilizing the object orientation, works are being made on the Java language drawing attention as an intranet development environment and the common object request broker architecture (CORBA). In the research of a technology to operate and control a large-scale network, basing on the current status of the KIND net of the Kansai Electric Power Company, discussions are being given on expanding and improving the functions of system tools made by Hitachi, Ltd. with an intention of achieving unified operation and control of the networks including not only the CSS system, but the host system. In the investigations and researches on different kinds of tools intended for data warehouse structuring, products are investigated and methods are discussed, such as the data extracting and editing tools to structure databases, and the on-line analysis processing (OLAP) tool to retrieve and analyze a great quantity of data. Researches are being made on application of the visual private office (VPO) service on the Internet, and on applicability evaluation for the individual certification technology. Investigations are being made on applicability of the enterprise resource planning (ERP) package. (NEDO)

  14. General Electric Nuclear Energy

    International Nuclear Information System (INIS)

    2001-01-01

    The ESBWR is a 1380 MWe boiling water reactor with improved operating safety margins and passive safety systems. He stated that the ESBWR derived from earlier GE plant design certification efforts and is the result of eight years of International cooperative work. He stated that the biggest challenge is to cross the regulatory hurdles associated with the inspections, tests, analyses, and acceptance criteria (ITAAC) and combined license (COL) programs. He further stated that he did not know how long it might take to license the ESBWR, in part, because the last GE design certification took about 8 to 10 years. Dr. Rao also provided a brief overview of the GE Nuclear Advance Liquid Metal S-PRISM design

  15. Formulation of a projection model of electric power demand applied to isolated systems in natural development: the case of the brazilian electric company of Rondonia territory; Formulacao de um modelo de projecao de demanda de energia eletrica aplicado a sistemas isolados em desenvolvimento natural: o caso da CERON - Centrais Eletricas de Rondonia

    Energy Technology Data Exchange (ETDEWEB)

    Dourado, Rosana Aparecida

    2004-07-01

    The Electricity inserts it self more than other services in the economy and in the Brasilian society resulting an increase of market of electrical energy more than that of economy e consequently in the national energy bases. Given the importance of the definition of the demand of electrical energy inside the development process of a region, the objective of this dissertation is to propose a model of forecasting energy demand applied to a small scale utility. With basing on the foundation that the electrical energy demand varies accordingly with the region, social levels and economical conditions and also the activities developed, the method utilized was a definition of a set of representative variables in this context, using the relation between the population an the number of residential consumers; consumption per residential consumer and the consumption structure of the residential segment over the total demand. The results with the application of the model utilizing this philosophy of the technique of modeling scenes, permitted the definition of electrical energy demand for the market of the Brazilian electric company CERON S.A. like a case study. (author)

  16. A hybrid approach based on ANP, ELECTRE and SIMANP metaheuristic method for outsourcing manufacturing procedures according to supply chain risks - Case study: A medical equipment manufacturer company in Iran

    Directory of Open Access Journals (Sweden)

    Hiwa Farughi

    2017-01-01

    Full Text Available Nowadays enterprises should consider seeking to reduce the supply chain risks as a crucial part of their activities in order to improve their competitiveness in the international context. Choosing the suitable strategy in connection with assigning some parts of the production process to outside the organization is a complex multi-criteria decision making problem and it gets more complicated when supply chain risk factors as the factors to select the strategy as well as dependence and the close ties between these criteria also be considered. In this paper, after the identification of risks in the supply chain of a medical equipment manufacturer company, dependence and ties between criteria in line with choosing the best strategy among existing alternatives has been examined in the form of a combined ANP-ELECTRE method. This combined model is of high performance to give a solution to the problem considered in this paper. But given the complex and time consuming nature of the AHP and ELECTRE, in this study a meta-heuristic algorithm is developed called SIMANP that despite the simplicity of computing and high-speed, is good in the terms of precision and efficiency. The results of comparing SIMANP algorithm and the proposed ANP - ELECTRE method are presented at the end.

  17. Quality management in shipping companies

    Directory of Open Access Journals (Sweden)

    Đergović Dragana M.

    2017-01-01

    Full Text Available As international business becomes more competitive, companies are finding that they need to work more effectively to stay in business. Quality assurance has become very important to the majority of production and service companies with international activity. Shipping companies were also required to implement a quality management system. The huge importance of safety in maritime transport operations resulted in the International Safety Management Code (ISM Code by the International Maritime Organization. The general management system principles embodied by the maritime ISM Code and generics ISO standards, have enabled their complementary application in establishing a quality management system in shipping companies, within a safety management system as its subset.

  18. A definition model of electric power tariff based on marginal cost: case study at CERON - the electric company of Rondonia, Brazil; Um modelo de definicao de tarifa de energia eletrica baseada no custo marginal: estudo de caso na CERON - Centrais Eletricas de Rondonia, Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Domiciano, Jose Antonio

    2002-07-01

    The present competition circumstances (ambient) require enterprises (companies or undertaking) like CERON to have understanding of all conditions to propose tariffs which give correct signal the consumers. Objective. Thus, search for valuations of model to define the tariff of electric energy based on marginal cost though a study in case of CERON. Method. Develop an investigation of a model of definition of tariffs of electric energy based on marginal costs to start the study in case of CERON and followed by analysis of its tariff structure. Results. With application of the signal (sign or indication) of tariffs, can measure the degree of separation of tariffs and to propose new modalities of alternate tariffs which offer conditions to reflect the real form of costs imposed by clients who form subgroups of tariffs of CERON. With final results, it offers parameters to trace (seek) important strategy for the company. Conclusion: The model gives condition's to identify and quantify of subsidies inside the tariff structure. It is a base which permits to create alternatives to resolve tariff distortions. It permits to have a better understanding which category (class) of consumers who are free will try to seek companies with tariffs which reflect really its costs. (author)

  19. A definition model of electric power tariff based on marginal cost: case study at CERON - the electric company of Rondonia, Brazil; Um modelo de definicao de tarifa de energia eletrica baseada no custo marginal: estudo de caso na CERON - Centrais Eletricas de Rondonia, Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Domiciano, Jose Antonio

    2002-07-01

    The present competition circumstances (ambient) require enterprises (companies or undertaking) like CERON to have understanding of all conditions to propose tariffs which give correct signal the consumers. Objective. Thus, search for valuations of model to define the tariff of electric energy based on marginal cost though a study in case of CERON. Method. Develop an investigation of a model of definition of tariffs of electric energy based on marginal costs to start the study in case of CERON and followed by analysis of its tariff structure. Results. With application of the signal (sign or indication) of tariffs, can measure the degree of separation of tariffs and to propose new modalities of alternate tariffs which offer conditions to reflect the real form of costs imposed by clients who form subgroups of tariffs of CERON. With final results, it offers parameters to trace (seek) important strategy for the company. Conclusion: The model gives condition's to identify and quantify of subsidies inside the tariff structure. It is a base which permits to create alternatives to resolve tariff distortions. It permits to have a better understanding which category (class) of consumers who are free will try to seek companies with tariffs which reflect really its costs. (author)

  20. Comparison of seating, powered characteristics and functions and costs of electrically powered wheelchairs in a general population of users.

    Science.gov (United States)

    Dolan, Michael John; Bolton, Megan Jennifer; Henderson, Graham Iain

    2017-10-26

    To profile and compare the seating and powered characteristics and functions of electrically powered wheelchairs (EPWs) in a general user population including equipment costs. Case notes of adult EPW users of a regional NHS service were reviewed retrospectively. Seating equipment complexity and type were categorized using the Edinburgh classification. Powered characteristics and functions, including control device type, were recorded. 482 cases were included; 53.9% female; mean duration EPW use 8.1 years (SD 7.4); rear wheel drive 88.0%; hand joystick 94.8%. Seating complexity: low 73.2%, medium 18.0%, high 8.7%. Most prevalent diagnoses: multiple sclerosis (MS) 25.3%, cerebral palsy (CP) 18.7%, muscular dystrophy (8.5%). Compared to CP users, MS users were significantly older at first use, less experienced, more likely to have mid-wheel drive and less complex seating. Additional costs for muscular dystrophy and spinal cord injury users were 3-4 times stroke users. This is the first large study of a general EPW user population using a seating classification. Significant differences were found between diagnostic groups; nevertheless, there was also high diversity within each group. The differences in provision and the equipment costs across diagnostic groups can be used to improve service planning. Implications for Rehabilitation At a service planning level, knowledge of a population's diagnostic group and age distribution can be used to inform decisions about the number of required EPWs and equipment costs. At a user level, purchasing decisions about powered characteristics and functions of EPWs and specialised seating equipment need to be taken on a case by case basis because of the diversity of users' needs within diagnostic groups. The additional equipment costs for SCI and MD users are several times those of stroke users and add between 60 and 70% of the cost of basic provision.

  1. The electricity market 2002

    International Nuclear Information System (INIS)

    2002-01-01

    The purpose of the 'Electricity market 2002' publication is to meet the need for generalized and readily accessible information on the conditions on the Nordic market. Iceland is not included in the description. The publication also includes summaries of information from recent years concerning electricity generation and utilization in the Nordic countries, the structure of the electricity market from the players' perspective, trade in electricity in the Nordic countries and in Northern Europe, electricity prices in the Nordic and other countries, and the impact of the electricity sector on the environment. The publication contains data on electricity generation and use during the past years, structure of the electricity market, trade in electricity in the Nordic countries and northern Europe, electricity prices in the Nordic countries and other countries as well as impact of electricity generation system on the environment. The market price of electricity is affected by a number of factors, including fuel prices, availability of water, and the power and energy balances of the various countries. The availability of water in Norway and Sweden has been very good in recent years, which has had a major influence on the price. 1996 was a dry year, which led to a high system price on Nord Pool. The price of electricity then dropped and has remained at a relatively low level up to the year 2001. The price of electricity rose during the spring of 2001 and remained at a higher level also during the summer months. The main reason was that the availability of water was lower than normal in Norway during the early part of the year. This created a higher demand for imported electricity in Norway and caused some apprehension that the year would be dry. The total price of electricity to the end users has not followed the system price development. The total cost of electricity to the end consumers consists of three items, i.e. the price of electricity, the network charges and

  2. Standard Technical Specifications General Electric plants, BWR/4:Bases (Sections 3.4-3.10). Volume 3, Revision 1

    International Nuclear Information System (INIS)

    1995-04-01

    This report documents the results of the combined effort of the NRC and the industry to produce improved Standard Technical Specifications (STS), Revision 1 for General Electric BWR/4 Plants. The changes reflected in Revision 1 resulted from the experience gained from license amendment applications to convert to these improved STS or to adopt partial improvements to existing technical specifications. This NUREG is the result of extensive public technical meetings and discussions between the Nuclear Regulatory Commission (NRC) staff and various nuclear power plant licensees, Nuclear Steam Supply System (NSSS) Owners Groups, NSSS vendors, and the Nuclear Energy Institute (NEI). The improved STS were developed based on the criteria in the Final Commission Policy Statement on Technical Specifications Improvements for Nuclear Power Reactors, dated July 22, 1993. The improved STS will be used as the basis for individual nuclear power plant licensees to develop improved plant-specific technical specifications. This report contains three volumes. Volume 1 contains the specifications for all chapters and sections of the improved STS. Volume 2 contains he Bases for Chapters 2.0 and 3.0, and Sections 3.1-3.3 of the improved STS. This document, Volume 3, contains the Bases for Sections 3.4-3.10 of the improved STS

  3. Load Frequency Control in Isolated Micro-Grids with Electrical Vehicles Based on Multivariable Generalized Predictive Theory

    Directory of Open Access Journals (Sweden)

    Jun Yang

    2015-03-01

    Full Text Available In power systems, although the inertia energy in power sources can partly cover power unbalances caused by load disturbance or renewable energy fluctuation, it is still hard to maintain the frequency deviation within acceptable ranges. However, with the vehicle-to-grid (V2G technique, electric vehicles (EVs can act as mobile energy storage units, which could be a solution for load frequency control (LFC in an isolated grid. In this paper, a LFC model of an isolated micro-grid with EVs, distributed generations and their constraints is developed. In addition, a controller based on multivariable generalized predictive control (MGPC theory is proposed for LFC in the isolated micro-grid, where EVs and diesel generator (DG are coordinated to achieve a satisfied performance on load frequency. A benchmark isolated micro-grid with EVs, DG, and wind farm is modeled in the Matlab/Simulink environment to demonstrate the effectiveness of the proposed method. Simulation results demonstrate that with MGPC, the energy stored in EVs can be managed intelligently according to LFC requirement. This improves the system frequency stability with complex operation situations including the random renewable energy resource and the continuous load disturbances.

  4. Calculation of particulate dispersion in a design-basis tornadic storm from the General Electric Vallecitos Nuclear Center, Vallecitos, California

    International Nuclear Information System (INIS)

    Pepper, D.W.

    1979-11-01

    A three-dimensional numerical model is used to calculate ground-level air concentration and deposition (due to precipitation scavenging) after a hypothetical tornado strike at the General Electric Vallecitos Nuclear Center at Vallecitos, California. Plutonium particles less than 20 μm in diameter are assumed to be lifted into the tornadic storm cell by the vortex. The rotational characteristics of the tornadic storm are embedded within the larger mesoscale flow of the storm system. The design-basis translational wind values are based on probabilities associated with existing records of tornado strikes in the vicinity of the plant site. Turbulence exchange coefficients are based on empirical values deduced from experimental data in severe storms and from theoretical assumptions obtained from the literature. The method of moments is used to incorporate subgrid-scale resolution of the concentration within a grid cell volume. This method is a quasi-Lagrangian scheme which minimizes numerical error associated with advection. In all case studies, the effects of updrafts and downdrafts, coupled with scavenging of the particulates by precipitation, account for most of the material being deposited within 20 to 45 km downwind of the plant site. Ground-level isopleths in the x-y plane show that most of the material is deposited behind and slightly to the left of the centerline trajectory of the storm. Approximately 5% of the material is dispersed into the stratosphere and anvil section of the storm

  5. Calculation of particulate dispersion in a design-basis tornadic storm from the General Electric Vallecitos Nuclear Center, Vallecitos, California

    Energy Technology Data Exchange (ETDEWEB)

    Pepper, D.W.

    1979-11-01

    A three-dimensional numerical model is used to calculate ground-level air concentration and deposition (due to precipitation scavenging) after a hypothetical tornado strike at the General Electric Vallecitos Nuclear Center at Vallecitos, California. Plutonium particles less than 20 ..mu..m in diameter are assumed to be lifted into the tornadic storm cell by the vortex. The rotational characteristics of the tornadic storm are embedded within the larger mesoscale flow of the storm system. The design-basis translational wind values are based on probabilities associated with existing records of tornado strikes in the vicinity of the plant site. Turbulence exchange coefficients are based on empirical values deduced from experimental data in severe storms and from theoretical assumptions obtained from the literature. The method of moments is used to incorporate subgrid-scale resolution of the concentration within a grid cell volume. This method is a quasi-Lagrangian scheme which minimizes numerical error associated with advection. In all case studies, the effects of updrafts and downdrafts, coupled with scavenging of the particulates by precipitation, account for most of the material being deposited within 20 to 45 km downwind of the plant site. Ground-level isopleths in the x-y plane show that most of the material is deposited behind and slightly to the left of the centerline trajectory of the storm. Approximately 5% of the material is dispersed into the stratosphere and anvil section of the storm.

  6. Standard Technical Specifications General Electric plants, BWR/4: Bases (Sections 2.0-3.3). Volume 2, Revision 1

    International Nuclear Information System (INIS)

    1995-04-01

    This report documents the results of the combined effort of the NRC and the industry produce improved Standard Technical Specifications (STS), Revision 1 for General Electric BWR/4 Plants. The changes reflected in Revision 1 resulted from the experience gained from license amendment applications to convert to these improved ST or to adopt partial improvements to existing technical specifications. This NUREG is the result of extensive public technical meetings and discussions between the Nuclear Regulatory Commission (NRC) staff and various nuclear power plant licensees, Nuclear Steam Supply System (NSSS) Owners Groups, NSSS vendors, and the Nuclear Energy Institute (NEI). The improved STS were developed based on the criteria in the Final Commission Policy Statement on Technical Specifications Improvements for Nuclear Power Reactors, dated July 22, 1993. The improved STS will be used as the basis for individual nuclear power plant licensees to develop improved plant-specific technical specifications. This report contains three volumes. Volume I contains the Specifications for all chapters and sections of the improved STS. This document, Volume 2, contains the Bases for Chapters 2.0 and 3.0, and Sections 3.1-3.3 of the improved STS. Volume 3 contains the Bases for Sections 3.4-3.10 of the improved STS

  7. The electricity market 2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-10-01

    The purpose of the 'Electricity market 2002' publication is to meet the need for generalized and readily accessible information on the conditions on the Nordic market. Iceland is not included in the description. The publication also includes summaries of information from recent years concerning electricity generation and utilization in the Nordic countries, the structure of the electricity market from the players' perspective, trade in electricity in the Nordic countries and in Northern Europe, electricity prices in the Nordic and other countries, and the impact of the electricity sector on the environment. The publication contains data on electricity generation and use during the past years, structure of the electricity market, trade in electricity in the Nordic countries and northern Europe, electricity prices in the Nordic countries and other countries as well as impact of electricity generation system on the environment. The market price of electricity is affected by a number of factors, including fuel prices, availability of water, and the power and energy balances of the various countries. The availability of water in Norway and Sweden has been very good in recent years, which has had a major influence on the price. 1996 was a dry year, which led to a high system price on Nord Pool. The price of electricity then dropped and has remained at a relatively low level up to the year 2001. The price of electricity rose during the spring of 2001 and remained at a higher level also during the summer months. The main reason was that the availability of water was lower than normal in Norway during the early part of the year. This created a higher demand for imported electricity in Norway and caused some apprehension that the year would be dry. The total price of electricity to the end users has not followed the system price development. The total cost of electricity to the end consumers consists of three items, i.e. the price of electricity, the network

  8. Issues behind Radiation management of workers at Fukushima Nuclear Power Plant of Tokyo Electric Power Company. From the viewpoint of radiation exposure of the ocular lens and the biological effects to the lens

    International Nuclear Information System (INIS)

    Hayashida, Toshiyuki; Sasaki, Hiroshi; Hatsusaka, Natsuko; Hamada, Nobuyuki; Tatsuzaki, Hideo; Akahane, Keiichi; Yokoyama, Sumi

    2017-01-01

    In March 2011, the accident occurred at the Fukushima Daiichi Nuclear Power Plant of Tokyo Electric Power Company. During recovery from critical situations, the radiation dose for some emergency workers exceeded the effective dose limit recommended for an emergency situation. A month after the accident, the International Commission on Radiological Protection issued a statement on tissue reactions recommending significant reduction of the equivalent dose limit to the lens of the eye. Many radiation workers will need to be involved in treatment of water contaminated with radionuclides, fuel debris retrieval, and decommissioning of reactors for a long period of time. Thus, the optimized radiation control in the fields, exposure reduction, prevention of tissue reactions, and reduction of stochastic risks for workers becomes necessary. This paper discusses issues in relation to radiation protection of the ocular lens in such recovery workers, from the viewpoint of radiation exposure of workers, its management, manifestations and mechanisms of the lens effects. (author)

  9. Final Environmental Statement related to the operation of Perry Nuclear Power Plant, Units 1 and 2 Docket Nos. 50-440 and 50-441, Cleveland Electric Illuminating Company

    International Nuclear Information System (INIS)

    1982-08-01

    The information in this Final Environmental Statement is the second assessment of the environmental impact associated with the construction and operation of the Perry Nuclear Power Plant, Units 1 and 2, located on Lake Erie in Lake County, about 11 km (7 mi) northeast of Painesville, Ohio. The first assessment was the Final Environmental Statement related to the construction of the plant issued in April 1974, prior to issuance of the construction permits (CPRR-148 and CPPR-149). Plant construction for Unit 1 is currently about 83% complete, and Unit 2 about 43% complete. Fuel loading for Units 1 and 2 currently estimated by the licensee (Cleveland Electric Illuminating Company) for November 1983, with Unit 2 fuel load scheduled for May 1987. The present assessment is the result of the NRC staff review of the activities associated with the proposed operation of the plant

  10. Contribution of service companies

    International Nuclear Information System (INIS)

    Sole, L. M.; Cortes, A.

    2002-01-01

    The most influential aspect when choosing the model of contract between Client and Contractor relapses into the maturity reached by both parts. The service supplier will have to show his competence with his resume, not only technical, but also of actual actions concerning availability reliability, maintainability, security, environment and costs. That maturity may have been the reason why most of the service companies, of national scope, that carry out maintenance of nuclear power stations electricity and instrumentation nowadays, are present from the assembly and implementation phases of these nuclear power stations. (Author)

  11. Preliminary report on the Pacific Gas and Electric Company's notice of intention to seek certification for Geysers Unit 16 (78-NOI-6)

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    The preliminary findings of fact and conclusion adopted by the Commission Committee are presented. Also, a description of the proposed project, a summary of the proceedings to date, and local, state, and federal government agency comments on the proposal are included. Preliminary findings and conclusions are presented on: (a) conformity to the forecast of statewide and service area electric power demands; (b) the degree to which the proposed site and facility conform with applicable local, regional, state, and federal standards, ordinances and laws; (c) the safety and reliability of the facility; and (d) the relative merit of the proposed transmission line corridors. (MHR)

  12. SAFER - Company Snapshot - SAFER - Company Snapshot

    Data.gov (United States)

    Department of Transportation — The Company Snapshot is a concise electronic record of company identification, size, commodity information, and safety record, including the safety rating (if any),...

  13. UAV Inspection of Electrical Transmission Infrastructure with Path Conformance Autonomy and Lidar-Based Geofences NASA Report on UTM Reference Mission Flights at Southern Company Flights November 2016

    Science.gov (United States)

    Moore, Andrew J.; Schubert, Matthew; Rymer, Nicholas; Balachandran, Swee; Consiglio, Maria; Munoz, Cesar; Smith, Joshua; Lewis, Dexter; Schneider, Paul

    2017-01-01

    Flights at low altitudes in close proximity to electrical transmission infrastructure present serious navigational challenges: GPS and radio communication quality is variable and yet tight position control is needed to measure defects while avoiding collisions with ground structures. To advance unmanned aerial vehicle (UAV) navigation technology while accomplishing a task with economic and societal benefit, a high voltage electrical infrastructure inspection reference mission was designed. An integrated air-ground platform was developed for this mission and tested in two days of experimental flights to determine whether navigational augmentation was needed to successfully conduct a controlled inspection experiment. The airborne component of the platform was a multirotor UAV built from commercial off-the-shelf hardware and software, and the ground component was a commercial laptop running open source software. A compact ultraviolet sensor mounted on the UAV can locate 'hot spots' (potential failure points in the electric grid), so long as the UAV flight path adequately samples the airspace near the power grid structures. To improve navigation, the platform was supplemented with two navigation technologies: lidar-to-polyhedron preflight processing for obstacle demarcation and inspection distance planning, and trajectory management software to enforce inspection standoff distance. Both navigation technologies were essential to obtaining useful results from the hot spot sensor in this obstacle-rich, low-altitude airspace. Because the electrical grid extends into crowded airspaces, the UAV position was tracked with NASA unmanned aerial system traffic management (UTM) technology. The following results were obtained: (1) Inspection of high-voltage electrical transmission infrastructure to locate 'hot spots' of ultraviolet emission requires navigation methods that are not broadly available and are not needed at higher altitude flights above ground structures. (2) The

  14. ELSAM/ELKRAFT: Draft for the plan of management for bio-energy. ELSAM/ELKRAFT: The electricity companies' programme for gasification of coal and biomass

    International Nuclear Information System (INIS)

    1992-08-01

    The Danish power companies have, since the middle of the 80's carried through a technology development effort for the use of bio-fuels in power (and dual-purpose power) plants. This note concerns the current status of the development and a sketch for an action programme for future effort. Straw is the largest unexploited potential. The use of bio-fuels does not produce so much carbon dioxide, but on the other hand biomass supply can fluctuate. Biofuels are also difficult to stoke, and expensive. Close co-operation between agriculture and forestry is necessary and risks are high for the involved sectors. It must be possible to use bio-fuels combined with coal to secure a sturdy and economic energy production, it is necessary to have a stable energy and industrial policy to maintain interest in the long term development effort, the contrasts of interest between natural gas and bio-fuels on the decentralized thermal power market must be clarified and the prices of bio-fuels must be made competitive by making supply and subsidies more effective. The main areas for future development are the bio-fuel resources, logistics and economy, straw in central power plants, gasification of coal and biomass, bio-fuels in decentralized cogeneration plants, biogas plants, conversion of biomass to synthetic fuels etc. A close co-ordination of ELSAM/ELKRAFT's development activities and cooperation between organizations in Denmark and abroad should be aimed at. (AB)

  15. Safety evaluation report related to the operation of Susquehanna Steam Electric Station, Units 1 and 2. Docket Nos. 50-387 and 50-388, Pennsylvania Power and Light Company, Allegheny Electric Cooperative, Inc

    International Nuclear Information System (INIS)

    1982-07-01

    Information is presented concerning site characteristics; design criteria for systems and components; reactor thermal and hydraulic characteristics; reactor coolant pressure boundary; engineered safety features; instrumentation and control; electrical power systems; auxiliary systems; conduct of operations; quality assurance; and TMI-2 requirements

  16. 76 FR 52213 - Airworthiness Directives; General Electric Company (GE) CF6-45 Series and CF6-50 Series Turbofan...

    Science.gov (United States)

    2011-08-22

    ... ``LPT module.'' The commenters feel the term LPT module could be confused with the LPT rotor assembly... inspection (CSLI) appropriate to ensure a desired level of safety. We find that an acceptable level of safety...

  17. Pricing of Delivery Orders Issued Under Basic Ordering Agreement DAAJO9-85-G-A025, General Electric Company-Aircraft Engine Business Group

    National Research Council Canada - National Science Library

    1991-01-01

    .... We reviewed contractor proposals to the Army, Government contract documents, Defense Contract Audit Agency preaward audit reports, Naval Plant Representative Office cost and pricing analysis reports...

  18. The French Electricity Company (EDF) and GEC ALSTHOM have signed the agreement for Chinese Laibin B electric power plant; Electricite de France (EDF) et GEC ALSTHOM signent l'accord de la centrale electrique de Laibin B en Chine

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-03

    EDF and GEC ALSTHOM together with the government of Chinese Province Guangxi have organized in Pekin on 3 september 1997 a ceremony for signing a BOOT (Build, Own, Operate, Transfer) contract for the Coal Power Plant (2 x 360 MW) at Laibin B. This is the first Chinese BOOT contract in the power domain entirely financed by foreign capital. The two western companies which were retained for this project, following an international call for offers, invest USD 150 million of its own founds in this USD 600 million project. They will hold 60% and 40% of the capital of the company created for this project, respectively. The construction power plant is planned to be completed at the end of 1999 - beginning of 2000. After 15 years of industrial operation the power plant will be transferred to the autonomous government of the Province Guangxi. The communique contains the following 8 files: 1. The Laibin B power plant; 2. Build, Own, Operate, Transfer; 3. The autonomous Guangxi Province; 4. An outline of EDF in China; 5. Profile/activities of GEC ALSTHOM in China; 6. The 'Credit Agricole Indosuez' in China; 7. BZW Barclays PLC; 8. HSBC Investment Banking in China.

  19. Electric power annual 1995. Volume I

    International Nuclear Information System (INIS)

    1996-07-01

    The Electric Power Annual presents a summary of electric power industry statistics at national, regional, and State levels. The objective of the publication is to provide industry decisionmakers, government policymakers, analysts, and the general public with data that may be used in understanding U.S. electricity markets. The Electric Power Annual is prepared by the Coal and Electric Data and Renewables Division; Office of Coal, Nuclear, Electric and Alternate Fuels; Energy Information Administration (EIA); U.S. Department of Energy. In the private sector, the majority of the users of the Electric Power Annual are researchers and analysts and, ultimately, individuals with policy- and decisionmaking responsibilities in electric utility companies. Financial and investment institutions, economic development organizations interested in new power plant construction, special interest groups, lobbyists, electric power associations, and the news media will find data in the Electric Power Annual useful. In the public sector, users include analysts, researchers, statisticians, and other professionals with regulatory, policy, and program responsibilities for Federal, State, and local governments. The Congress and other legislative bodies may also be interested in general trends related to electricity at State and national levels. Much of the data in these reports can be used in analytic studies to evaluate new legislation. Public service commissions and other special government groups share an interest in State-level statistics. These groups can also compare the statistics for their States with those of other jurisdictions

  20. Electric emissions from electrical appliances

    International Nuclear Information System (INIS)

    Leitgeb, N.; Cech, R.; Schroettner, J.

    2008-01-01

    Electric emissions from electric appliances are frequently considered negligible, and standards consider electric appliances to comply without testing. By investigating 122 household devices of 63 different categories, it could be shown that emitted electric field levels do not justify general disregard. Electric reference values can be exceeded up to 11-fold. By numerical dosimetry with homogeneous human models, induced intra-corporal electric current densities were determined and factors calculated to elevate reference levels to accounting for reduced induction efficiency of inhomogeneous fields. These factors were found not high enough to allow generally concluding on compliance with basic restrictions without testing. Electric appliances usually simultaneously emit both electric and magnetic fields exposing almost the same body region. Since the sum of induced current densities is limited, one field component reduces the available margin for the other. Therefore, superposition of electric current densities induced by either field would merit consideration. (authors)

  1. The procedure for amendment of the technical conditions for electricity and natural gas. An essay on certain generally binding regulations

    International Nuclear Information System (INIS)

    Janssen, J.J.

    2009-01-01

    The energy law for the regulated Electricity and gas market has a stratified structure. The tariff structures and conditions that are established by the executive board of the Netherlands Competition Authority (NMa), based on article 36 of the Electricity Act 1998 and article 12f of the Gas Act, are in a way the tailpiece. This article focuses mainly on the procedure for amendment of these conditions. [nl

  2. Report made on behalf of the commission of economic affairs, environment and territory about the law project (no. 1613), relative to the electric and gas public utilities and to the power and gas companies; Rapport fait au nom de la Commission des affaires economiques, de l'environnement et du territoire sur le projet de loi (no. 1613), relatif au service public de l'electricite et du gaz et aux entreprises electriques et gazieres

    Energy Technology Data Exchange (ETDEWEB)

    Lenoir, J.C.

    2004-06-01

    The aim of this report is to present to the French deputies the comments made by the commission of economic affairs, environment and territory about the law project relative to the change of status of the power and gas public utilities in the framework of the deregulation of European energy markets. This law changes the juridical status of the two state monopolies Electricite de France (EdF) and Gaz de France (GdF) into two anonymous companies and creates two additional companies for the management of the power and gas networks. It ensures also the transposition of the European directives from June 26, 2003 (2003/54/CE and 2003/55/CE). It contains some proper dispositions and modifies various existing French laws, in particular the law no. 46-628 from April 8, 1946 about the electricity and gas nationalization and the law no. 2000-108 from February 10, 2000 relative to the modernization and development of the electric public utility. The first part of the document reports on the general discussions about the law project while the second part makes a detailed analysis of each article with some proposals of modifications. A comparative table puts in parallel the existing texts, the law project and the proposals made by the commission. (J.S.)

  3. Greengrid Electric

    International Nuclear Information System (INIS)

    Argue, D.

    1998-01-01

    This presentation focused on what customers want from a competitive electricity market and what motivates customers to choose a renewable energy product and service. Greengrid Electric, a subsidiary of Enershare Technology Corp., intends to provide the green electricity that they believe customers have wanted for some time. Enershare and Greengrid have been active participants in the electricity restructuring process in Ontario, and have provided input to the Market Design Committee. Once licensed as a retailer, Greengrid intends to be the major provider of green electricity in Ontario. The company will supply a 100 per cent renewable energy product to their wholesale and retail customers. The company is confident that there is a significant niche market in Ontario for selling a green product that has a blend of wind, small hydro (run-of-river or existing dam), solar, and for energy produced from capturing methane gas from municipal landfill sites. Company officials are confident that customers will be willing to pay a premium price for energy if their purchases will lead to environmental improvement

  4. Performance evaluation of the General Electric eXplore CT 120 micro-CT using the vmCT phantom

    Energy Technology Data Exchange (ETDEWEB)

    Bahri, M.A., E-mail: M.Bahri@ulg.ac.be [ULg-Liege University, Cyclotron Research Centre, Liege, Bat. 30, Allee du 6 aout, 8 (Belgium); Warnock, G.; Plenevaux, A. [ULg-Liege University, Cyclotron Research Centre, Liege, Bat. 30, Allee du 6 aout, 8 (Belgium); Choquet, P.; Constantinesco, A. [Biophysique et Medecine Nucleaire, Hopitaux universitaires de Strasbourg, Strasbourg (France); Salmon, E.; Luxen, A. [ULg-Liege University, Cyclotron Research Centre, Liege, Bat. 30, Allee du 6 aout, 8 (Belgium); Seret, A. [ULg-Liege University, Cyclotron Research Centre, Liege, Bat. 30, Allee du 6 aout, 8 (Belgium); ULg-Liege University, Experimental Medical Imaging, Liege (Belgium)

    2011-08-21

    The eXplore CT 120 is the latest generation micro-CT from General Electric. It is equipped with a high-power tube and a flat-panel detector. It allows high resolution and high contrast fast CT scanning of small animals. The aim of this study was to compare the performance of the eXplore CT 120 with that of the eXplore Ultra, its predecessor for which the methodology using the vmCT phantom has already been described . The phantom was imaged using typical a rat (fast scan or F) or mouse (in vivo bone scan or H) scanning protocols. With the slanted edge method, a 10% modulation transfer function (MTF) was observed at 4.4 (F) and 3.9-4.4 (H) mm{sup -1} corresponding to 114 {mu}m resolution. A fairly larger MTF was obtained by the coil method with the MTF for the thinnest coil (3.3 mm{sup -1}) equal to 0.32 (F) and 0.34 (H). The geometric accuracy was better than 0.3%. There was a highly linear (R{sup 2}>0.999) relationship between measured and expected CT numbers for both the CT number accuracy and linearity sections of the phantom. A cupping effect was clearly seen on the uniform slices and the uniformity-to-noise ratio ranged from 0.52 (F) to 0.89 (H). The air CT number depended on the amount of polycarbonate surrounding the area where it was measured; a difference as high as approximately 200 HU was observed. This hindered the calibration of this scanner in HU. This is likely due to the absence of corrections for beam hardening and scatter in the reconstruction software. However in view of the high linearity of the system, the implementation of these corrections would allow a good quality calibration of the scanner in HU. In conclusion, the eXplore CT 120 achieved a better spatial resolution than the eXplore Ultra (based on previously reported specifications) and future software developments will include beam hardening and scatter corrections that will make the new generation CT scanner even more promising.

  5. Slovak Electric, Plc., 1997

    International Nuclear Information System (INIS)

    1997-06-01

    Slovenske elektrarne, a.s. (Slovak Electric, Plc.) was established on November 1, 1994 as one entity among new entities created as successors to the former Slovensky energeticky podnik. The subject activity is the generation of electric power, operation of transmission 220 kV and 400 kV systems, transit, import, export, and sales of electric power. Besides these activities the company deals with generation, distribution, and sales of heat. The company operates one nuclear power station, three thermal power plants, and thirty hydro power plants. One nuclear Power plant is under construction (state up tu June 1997). On this CD ROM next chapters are presented: (1) The structure of the company; (2) The production Units; (3) The economic power of the company; (4) The operation culture of the company; (5) The strategic plans of the company

  6. Two's Company

    DEFF Research Database (Denmark)

    Coad, Alexander Jean-Luc; Timmermans, Bram

    2014-01-01

    characteristic in how the diversity aects performance. Older founders generally have lower employment growth. Pairs of males perform better than pairs of females. Education level has no clear eect on either survival or growth. For education type, however, we observe that businesses do well with STEM as primary...

  7. Light, distribution company in Brazil

    International Nuclear Information System (INIS)

    Meritet, S.

    2005-01-01

    Since the publication of the Roulet Report, Electricite de France (EDF), the French group is crossing tormented hours. Despite its good financial results in 2004 with a turnover of 46.9 Mds euros its debts are around 19.7 Mds euros and are mainly due to its international investments which were not all very profitable. The first source of concern remains the Latin America markets and more particularly the Brazilian one which recorded 1.6 Md euros of losses. The future of EDF investment in Brazil, through its acquisition of the distribution company, Light, is uncertain. Within a new electric power industry framework, after currency devaluation and a rationing, Light is now in a catastrophic financial situation. The last tariff revisions given by the Brazilian authorities and the economic characteristics of the concession put the distributor at the edge of the bankruptcy. This article presents the situation of EDF group and Light at the end of 2004. The main question is the future of the Brazilian distributor in general and more particularly within the French group EDF. (author)

  8. The new tariff model based on marginal costs developing concept for Brazilian electric sector. A case study for Power and Light Company of Sao Paulo State (Brazil); O novo modelo tarifario baseado no conceito de custos marginais em desenvolvimento para o setor eletrico brasileiro. Um estudo de caso para a Companhia Paulista de Forca e Luz

    Energy Technology Data Exchange (ETDEWEB)

    Correia, S.P.S.

    1991-12-31

    A new methodology for power generation cost accounts in Brazilian electric sector is described, with the application of marginal costs theory and its deviation in developing economies. A case report from a Brazilian Power and Light Company is studied, focalizing the seasoning, the planning, the tariff model and the power generation, transmission and distribution. (M.V.M.). 19 refs, 28 figs, 1 tab.

  9. Resolution 519/012. It is allowed to R DEL SUR S.A company to generate a wind electricity source by a generating power plant placed in Maldonado province 2nd and 4th Catastral section, as well as the connection to the Interconnected National System

    International Nuclear Information System (INIS)

    2012-01-01

    The Resolution 519 is according to the Electric Wholesale Market regulation and it authorizes the power generation using the wind as the primary source. The company who presented this project was R DEL SUR S.A with the aim to instal a wind power plant in Maldonado province.

  10. The new tariff model based on marginal costs developing concept for Brazilian electric sector. A case study for Power and Light Company of Sao Paulo State (Brazil); O novo modelo tarifario baseado no conceito de custos marginais em desenvolvimento para o setor eletrico brasileiro. Um estudo de caso para a Companhia Paulista de Forca e Luz

    Energy Technology Data Exchange (ETDEWEB)

    Correia, S P.S.

    1992-12-31

    A new methodology for power generation cost accounts in Brazilian electric sector is described, with the application of marginal costs theory and its deviation in developing economies. A case report from a Brazilian Power and Light Company is studied, focalizing the seasoning, the planning, the tariff model and the power generation, transmission and distribution. (M.V.M.). 19 refs, 28 figs, 1 tab.

  11. Company cases Denmark

    DEFF Research Database (Denmark)

    Tølle, Martin; Pedersen, Jørgen Lindgaard

    2005-01-01

    for government sector in Denmark. DC employed 1,000 persons and had a market share on 75 % in the market of large government institutions when it was taken over. Danish government wanted to sell DC in order to get more intensity in competion in IT - markets in general and especially in the market for public...... IT - solitions. CSC wanted to buy DC to penetrate the Nordic market. Some effects can be mentioned: Employment in CSC - DK is in 2003 1,700 persons or 2,600 including other companies bought up recently. In innovation positive effects can be registered from contacts with CSC - International. Not only from access...... - Laboratoriet, Benzon - Pharma and Pharma - Medica during years 1988 - 1991.Nycomed wants to establish itself as a company on European level.After a decade with different owners, fusions and splitting ups a construction in which head quarter and R&D move to Denmark close to Copenhagen. The importance...

  12. Communication Practices in Technology Companies.

    OpenAIRE

    Casey, Ruth; Gallagher, Marc

    2016-01-01

    It is contended that the skills or competencies that are required of business graduates by technology companies, range from the ability to communicate complex information about global issues in ways that are accessible to and connect with the general public, to problem-solving and project-based interaction. This represents a shift in the type of communication practice that now characterises the technology company, with its main focus on “agile” frameworks of teamwork. This report examines the...

  13. Energy Conversion Alternatives Study (ECAS), General Electric Phase 1. Volume 1: Executive summary. [using coal or coal derived fuels

    Science.gov (United States)

    Corman, J. C.

    1976-01-01

    A data base for the comparison of advanced energy conversion systems for utility applications using coal or coal-derived fuels was developed. Estimates of power plant performance (efficiency), capital cost, cost of electricity, natural resource requirements, and environmental intrusion characteristics were made for ten advanced conversion systems. Emphasis was on the energy conversion system in the context of a base loaded utility power plant. All power plant concepts were premised on meeting emission standard requirements. A steam power plant (3500 psig, 1000 F) with a conventional coal-burning furnace-boiler was analyzed as a basis for comparison. Combined cycle gas/steam turbine system results indicated competitive efficiency and a lower cost of electricity compared to the reference steam plant. The Open-Cycle MHD system results indicated the potential for significantly higher efficiency than the reference steam plant but with a higher cost of electricity.

  14. A case of generalized morphoea occurring in an A-bomb survivor and about it's course cured by negative electric charge therapy

    International Nuclear Information System (INIS)

    Hirofuji, Michio

    1986-01-01

    A 36-year-old woman with generalized morphaea was exposed to A-bomb within a wooden house at 1,100 m from the hypocenter in Hiroshima at the age of 25 years. Subcutaneous hemorrhage-like erythema occurred in the left leg two years after exposure, and spread over the bilateral legs. Electric charge therapy was performed twice a day. In addition to improvement of her general symptoms, the glossy, dried, atrophied, sclerotic skin lesions became soft, moist, and smooth. Swelling of the legs and seven ulcerated sites healed, leaving scars. These findings suggest the potential physiological benefits of this therapy. (Namekawa, K.)

  15. Industrial structure and privatisation of the Slovenian electricity industry

    International Nuclear Information System (INIS)

    Hrovatin, N.

    1999-01-01

    The paper first analyses the existing structure of the Slovenian electricity industry and gives recommendations for its restructuring so as to conform to efficiency criteria and to comply with European Union provisions on the internal European electricity market. Then the paper outlines the necessity for privatisation and draws some conclusions on it such as determination of market values companies, the proportion for sale, privatisation methods and the general public's participation [it

  16. Radioactivity leakage accidents in the feed water heater and the general drainage of the Tsuruga Nuclear Power Station of Japan Atomic Power Company

    International Nuclear Information System (INIS)

    1981-01-01

    In the Tsuruga Nuclear Power Station, JAPC on the shell on extracted-steam side in B system of No. 4 feed water heater, drain water leakage occurred twice in January, 1981. Then, 61 pCi/g cobalt-60 and 10 pCi/g manganese-54 were detected in soil at the outlet of general drainage on April 17, 1981. The cause was found to be the overflow of radioactive liquid waste in the filter sludge storage tank on March 8, the same year. On-the-spot inspection was subsequently made by the Agency of Natural Resources and Energy on both leakage accidents. The results of inspections are described as follows: the course of leakage accident, and also the measures taken to JAPC in connection with the two leakage accidents. (J.P.N.)

  17. Law no. 2004-803 from August 9, 2004 relative to electricity and gas public utilities and to the power and gas companies; Loi no. 2004-803 du 9 aout 2004 relative au service public de l'electricite et du gaz et aux entreprises electriques et gazieres

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-09-01

    The aim of this law is to allow the administrations to avoid to use their eligibility right with the opening of the electricity and gas markets to competition. It changes the juridical status of the two public utilities Electricite de France (EdF) and Gaz de France (GdF) into two anonymous companies and creates two additional companies for the management of the power and gas networks. It ensures also the transposition of the European directives from June 26, 2003 (2003/54/CE and 2003/55/CE). It contains some proper dispositions and modifies various existing French laws, in particular the law no. 46-628 from April 8, 1946 about the electricity and gas nationalization and the law no. 2000-108 from February 10, 2000 relative to the modernization and development of the electric public utility. (J.S.)

  18. A study of electricity planning in Thailand: An integrated top-down and bottom-up Computable General Equilibrium (CGE) modeling analysis

    Science.gov (United States)

    Srisamran, Supree

    This dissertation examines the potential impacts of three electricity policies on the economy of Thailand in terms of macroeconomic performance, income distribution, and unemployment rate. The three considered policies feature responses to potential disruption of imported natural gas used in electricity generation, alternative combinations (portfolios) of fuel feedstock for electricity generation, and increases in investment and local electricity consumption. The evaluation employs Computable General Equilibrium (CGE) approach with the extension of electricity generation and transmission module to simulate the counterfactual scenario for each policy. The dissertation consists of five chapters. Chapter one begins with a discussion of Thailand's economic condition and is followed by a discussion of the current state of electricity generation and consumption and current issues in power generation. The security of imported natural gas in power generation is then briefly discussed. The persistence of imported natural gas disruption has always caused trouble to the country, however, the economic consequences of this disruption have not yet been evaluated. The current portfolio of power generation and the concerns it raises are then presented. The current portfolio of power generation is heavily reliant upon natural gas and so needs to be diversified. Lastly, the anticipated increase in investment and electricity consumption as a consequence of regional integration is discussed. Chapter two introduces the CGE model, its background and limitations. Chapter three reviews relevant literature of the CGE method and its application in electricity policies. In addition, the submodule characterizing the network of electricity generation and distribution and the method of its integration with the CGE model are explained. Chapter four presents the findings of the policy simulations. The first simulation illustrates the consequences of responses to disruptions in natural gas imports

  19. Company profile VUJE

    International Nuclear Information System (INIS)

    Anon

    2007-01-01

    At the present time the whole world realizes the serious need for energy for the preservation of perpetually sustainable development. A distinctive place in the life of modern society belongs to electric energy,its safe production and reliable delivery according high standards of quality. When our company was established 30 years ago, we assumed research and development challenges directly related to the safe, reliable and economical production of electric energy from nuclear power plants, as well as the elimination of potential negative influences on the environment and employees. During our existence, we have gradually expanded our activities and specializations. Our first job was ti train plant personnel. We trained specialists to meet the needs not only of (what was then) Czechoslovakia, but also of Germany and Hungary. Gradually, we also met the problems of processing and storing radioactive waste, maintaining the service-life of our equipment and deactivating and disposing of contaminated devices at the end their operating lives. Industry requirements and concerns led us to broaden our services in energy production to include renewable sources of energy. Our youngest division of activity deals with the distribution of hydro-electrical energy via the electric grid. By continually updating the specialized skills of our elmasil and by investing in the latest equipment, our challenges and operational issues in the energy sector. Responding to developmental trends and the requirements of our consumers, we have established a system of quality management, which complies with the ISO 9001 and 14001 standards certified by the LRQA Corporation of Great Britain. Throughout the years, our company has been consistently proving to the operators of power facilities, both in Slovakia and abroad, our viability and high, innovative potential, in recognition of this, in 2005, when we participated in the sixth EU Framework Programme in R and D, the Slovak Ministry of Education

  20. Company profile VUJE

    International Nuclear Information System (INIS)

    Anon

    2007-01-01

    At the present time the whole world realizes the serious need for energy for the preservation of perpetually sustainable development. A distinctive place in the life of modern society belongs to electric energy,its safe production and reliable delivery according high standards of quality. When our company was established 30 years ago, we assumed research and development challenges directly related to the safe, reliable and economical production of electric energy from nuclear power plants, as well as the elimination of potential negative influences on the environment and employees. During our existence, we have gradually expanded our activities and specializations. Our first job was ti train plant personnel. We trained specialists to meet the needs not only of (what was then) Czechoslovakia, but also of Germany and Hungary. Gradually, we also met the problems of processing and storing radioactive waste, maintaining the service-life of our equipment and deactivating and disposing of contaminated devices at the end their operating lives. Industry requirements and concerns led use to broaden our services in energy production to include renewable sources of energy. Our youngest division of activity deals with the distribution of hydro-electrical energy via the electric grid. By continually updating the specialized skills of our employees and by investing in the latest equipment, our challenges and operational issues in the energy sector. Responding to developmental trends and the requirements of our consumers, we have established a system of quality management, which complies with the ISO 9001 and 14001 standards certified by the LRQA Corporation of Great Britain. Throughout the years, our company has been consistently proving to the operators of power facilities, both in Slovakia and abroad, our viability and high, innovative potential, in recognition of this, in 2005, when we participated in the sixth EU Framework Programme in R and D, the Slovak Ministry of

  1. Factors defining value and direction of thermal pressure between the mine shafts and impact of the general mine natural draught on ventilation process of underground mining companies

    Science.gov (United States)

    Nikolaev, A. V.; Alymenko, N. I.; Kamenskikh, A. A.; Alymenko, D. N.; Nikolaev, V. A.; Petrov, A. I.

    2017-10-01

    The article specifies measuring data of air parameters and its volume flow in the shafts and on the surface, collected in BKPRU-2 (Berezniki potash plant and mine 2) («Uralkali» PJSC) in normal operation mode, after shutdown of the main mine fan (GVU) and within several hours. As a result of the test it has been established that thermal pressure between the mine shafts is active continuously regardless of the GVU operation mode or other draught sources. Also it has been discovered that depth of the mine shafts has no impact on thermal pressure value. By the same difference of shaft elevation marks and parameters of outer air between the shafts, by their different depth, thermal pressure of the same value will be active. Value of the general mine natural draught defined as an algebraic sum of thermal pressure values between the shafts depends only on the difference of temperature and pressure of outer air and air in the shaft bottoms on condition of shutdown of the air handling system (unit-heaters, air conditioning systems).

  2. Electrical contracting

    CERN Document Server

    Neidle, Michael

    2013-01-01

    Electrical Contracting, Second Edition is a nine-chapter text guide for the greater efficiency in planning and completing installations for the design, installation and control of electrical contracts. This book starts with a general overview of the efficient cabling and techniques that must be employed for safe wiring design, as well as the cost estimation of the complete electrical contract. The subsequent chapters are devoted to other electrical contracting requirements, including electronic motor control, lighting, and electricity tariffs. A chapter focuses on the IEE Wiring Regulations an

  3. Electric power: the liberalization effects

    International Nuclear Information System (INIS)

    Carpentier, J.

    1999-01-01

    Nine months after the beginning of the deregulation of electric power markets in Europe, the first effects are being felt: fall of prices, amalgamation of electric power companies, development of new technologies and unemployment. (O.M.)

  4. Electric power monthly, January 1994

    International Nuclear Information System (INIS)

    1994-01-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data in this report are presented for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The EIA collected the information in this report to fulfill its data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275) as amended. This publication provides monthly statistics at the US Census division, and State levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. Statistics by company and plant are published in the EPM on the capability of new generating units, net generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost of fossil fuels

  5. Electric power monthly, February 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-16

    The Electric Power Monthly (EMP) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data in this report are presented for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The EIA collected the information in this report to fulfill its data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275) as amended. This publication provides monthly statistics at the US, Census division, and State levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. Statistics by company and plant are published in the EPM on the capability of new generating units, net generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost of fossil fuels.

  6. Electric power monthly, January 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-26

    The Electric Power Monthly (EPM) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data in this report are presented for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The EIA collected the information in this report to fulfill its data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275) as amended. This publication provides monthly statistics at the US Census division, and State levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. Statistics by company and plant are published in the EPM on the capability of new generating units, net generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost of fossil fuels.

  7. Electric power monthly, October 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-20

    The Electric Power Monthly (EPM) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data in this report are presented for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The EIA collected the information in this report to fulfill its data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275) as amended. This publication provides monthly statistics at the US, Census division, and State levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. Statistics by company and plant are published in the EPM on the capability of new generating units, net generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost of fossil fuels.

  8. SAFER - Company Snapshot

    Data.gov (United States)

    Department of Transportation — The Company Snapshot is a concise electronic record of company identification, size, commodity information, and safety record, including the safety rating (if any),...

  9. Electric power monthly, December 1997 with data for September 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics for a wide audience including congress, Federal and State agencies, the electric utility industry, and the general public. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. This publication provides monthly statistics at the State, Census division, and US levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity retail sales, associated revenue, and average revenue per kilowatthour of electricity sold. In addition, data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source; consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant. 63 tabs.

  10. Electric power monthly, May 1995 with data for February 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-24

    The Electric Power Monthly (EPM) presents monthly electricity statistics for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The purpose of this publication is to provide energy decisiommakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. The publication provides monthly statistics at the State, Census division, and US levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuel, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source; consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant.

  11. Electric Car Special

    Energy Technology Data Exchange (ETDEWEB)

    Zoethout, T.; Belin, H.; Verwijs, H.; Nicola, S.; De Saint Jacob, Y.; Gatermann, R.

    2009-09-15

    In six articles, two columns and two interviews a part of this issue is dedicated to electric car developments: about winners and losers in the electric car race; a unique business model to rolling out the electric car by the electric battery company Better Place and the automobile industry Renault Nissan; interview with entrepreneur Shai Agassi of the Indian company Better Place; the development of electric cars in Germany; interview with Jean-Jacques Chanaron, an economist specialising in innovation management and a firm believer in electric cars; start of mass production of electric vehicles at the Japanese Nissan automobile industry; the constraints in Sweden in developing fuel-efficient automobiles; plans for 1 million electric or hybrid cars by 2025 in the Netherlands.

  12. Requirements management at Westinghouse Electric Company

    International Nuclear Information System (INIS)

    Gustavsson, Henrik

    2014-01-01

    Field studies and surveys made in various industry branches support the Westinghouse opinion that qualitative systems engineering and requirements management have a high value in the development of complex systems and products. Two key issues causing overspending and schedule delays in projects are underestimation of complexity and misunderstandings between the different sub-project teams. These issues often arise when a project jumps too early into detail design. Good requirements management practice before detail design helps the project teams avoid such issues. Westinghouse therefore puts great effort into requirements management. The requirements management methodology at Westinghouse rests primarily on four key cornerstones: 1 - Iterative team work when developing requirements specifications, 2 - Id number tags on requirements, 3 - Robust change routine, and 4 - Requirements Traceability Matrix. (authors)

  13. 12 CFR 584.2-2 - Permissible bank holding company activities of savings and loan holding companies.

    Science.gov (United States)

    2010-01-01

    ... savings and loan holding companies. 584.2-2 Section 584.2-2 Banks and Banking OFFICE OF THRIFT SUPERVISION, DEPARTMENT OF THE TREASURY SAVINGS AND LOAN HOLDING COMPANIES § 584.2-2 Permissible bank holding company activities of savings and loan holding companies. (a) General. For purposes of § 584.2(b)(6)(i) of this part...

  14. 12 CFR 225.82 - How does a bank holding company elect to become a financial holding company?

    Science.gov (United States)

    2010-01-01

    ... holding company to become a financial holding company shall not be effective if, during the period...) Effective date of election—(1) In general. An election filed by a bank holding company under paragraph (a... financial holding company is effective prior to the 31st day after the date that a complete declaration was...

  15. Controlling Electrical Hazards

    National Research Council Canada - National Science Library

    1997-01-01

    ...). In general, OSHA's electrical standards are based on the National Fire Protection Associations Standard NFPA 70E, Electrical Safety Requirements for Employee Workplaces, and in turn, from the National Electrical Code (NEC...

  16. Prices on electricity and transmission of electricity

    International Nuclear Information System (INIS)

    2003-01-01

    This publication contains data on prices of electric energy and transmission of electricity valid from 1 January 2003. The purpose is to illustrate the price changes on the electricity market in terms of prices for different customer categories. All companies holding network concessions for areas and all companies trading in electricity are included in this report, which is produced on an annual basis.The prices for transmission services 1 January 2003 were on the whole unchanged compared to the preceding year. For households the mean annual cost was SEK 882 for flats, SEK 4 335 for one- or two-family houses with electric heating and SEK 1 925 for those without electric heating. Electricity prices rose considerably on 1 January 2003 compared to the year before. The mean price per kWh for households with standard agreements was SEK 0.519 for deliveries to flats, SEK 0.447 for one- or two-family houses with electric heating and SEK 0.471 without electric heating. As a result, the mean annual cost increased by SEK 326 for flats, SEK 3 012 for one- or two-family houses with electric heating, and by SEK 774 for those houses without electric heating. The high costs of electricity may be explained in part by the development on the Nordic Power Exchange (Nord Pool), where the spot price increased by about 290 per cent during 2002 (1 USD is about 8 SEK)

  17. The Canadian Niagara Power Company story

    International Nuclear Information System (INIS)

    Ball, N.R.

    2005-01-01

    This book chronicles the history and contributions of the Canadian Niagara Power Company and its employees toward the establishment of electricity generation and distribution in Niagara Falls and Fort Erie, Ontario, dating back to its founding in 1892. Through historical photographs, maps and drawings, the book demonstrates the impact of electricity on the Niagara region. It emphasizes the many skills and jobs required to run the company that generated electricity and maintained a complete system to deliver power, metering, and billing services through the depression, wars, and postwar booms, even during lightning, snow and ice storms. The company began producing power in 1905 with what had been the world's largest-capacity turbines and generators that supplied power to both sides of the Niagara River. Initially, most of the electricity was exported to New York State. The company eventually expanded its Canadian customer service area from Niagara Falls, Ontario, to Fort Erie, Bridgeburg, Amigari, Ridgeway, Stevensville, Crystal Beach and Point Abino. Throughout its history, the Canadian Niagara Power Company provided power at a lower cost than its neighbouring competitors. The William Birch Rankine Generating Station became an important tourist attraction, showcasing the latest electrical appliances of the time in an effort to promote the use of electricity in homes and offices. Today, the station remains a tribute to the fact that natural beauty can coincide with industry. The book also chronicles the difficult business challenges caused by restructuring in the electric power industry in the 1990s, repairing aging equipment and applying the latest in automation and remote sensing technology. Today, the company as FortisOntario is expanding to other communities around Ontario. refs., tabs., figs

  18. MERGER ACCOUTING FOR COMPANIES

    OpenAIRE

    SUCIU GHEORGHE

    2014-01-01

    Companies, especially nowadays, are characterized through great mobility, fast circulation of capital, occurring in their chase for profit. In this context, companies look for alliances, economical and political assistance. These objectives can materialize through merging of companies. The merger can be internal (between Romanian companies) or transboundary, which includes foreign companies. In order to correctly reflect these events, the merger operations must be regulated and mu...

  19. Gas supply and Yorkshire Electricity

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1995-04-01

    Yorkshire Electricity, among other independent suppliers of gas, now competes for a share of the United Kingdom gas market, previously monopolised by British Gas. The experience of this successful electric utility company, expanding into the industrial and domestic gas supply market is described in the article. The company`s involvement stems partly from the fact that significant volumes of gas are landed at three terminals within its franchise area. The company will also seek to use subsidaries to generate electric power from gas turbine power plants and explore the possibilities of developing combined heat and power (CHP) plants where appropriate. (UK)

  20. European Energy Companies. An Industry in Search of its Future

    International Nuclear Information System (INIS)

    2003-01-01

    In summer 2002 The Algemene Energieraad (General Energy Council) of The Netherlands has commissioned a research study to investigate the strategic behaviour of major European energy companies and the major governmental institutions in charge of regulating them. In total 18 electricity and gas companies and 9 governmental public institutions were analyzed. The aim of this research was to explore how the microeconomic view of analysing company and government strategy can contribute to understanding the likely future path of the energy industry, and what follows from that for the regulatory agenda and company strategy development. The is structured in seven chapters. The first chapter will first outline what the challenges for the European energy industry are. Most of the challenges result in the need for high investments and considerable changes in operating systems and business models. Against these challenges, the second chapter outlines what the expectations are of the industry. The public goods to be delivered by the industry is in the main to deliver high quality products at low prices and minimized environmental impact, in order to promote the conditions for economic growth of the European economy. Chapter 3 then describes the typical behaviour of the energy companies, being mostly engaged in a strategic conduct that is autonomy-oriented, short term and emergent planning with an international focus. Chapter 4 explains how the challenges and expectations could be better met with a strategic behaviour of companies that are network-oriented, long term deliberate planners and with a local focus. Chapter 5 explains that the observed strategic behaviour leads to an industrial structure that is geared towards maintaining static competition and avoiding innovation. Chapter 6 shows, how the current regulatory regime of the industry may reinforce this static competition even further. Chapter 7 finally concludes with alternative course of actions how the regulatory