WorldWideScience

Sample records for gas building installations

  1. Planning of installations in prefabricated buildings

    Directory of Open Access Journals (Sweden)

    Stanojević Ana D.

    2014-01-01

    Full Text Available Planning installations is becoming an increasing problem in construction, because the number of devices for technical supply is constantly increasing with continual progress in science and technology. Since the installations of the building can not be viewed unrelated of the construction, problem of its planning is more complicated in prefabricated buildings because the elements of construction are prefabricated. Planning was formerly performed by embedding the installation in prefabricated elements. This method had a lot of flaws, and modern approach tends setting installation out of prefabricated elements except when the traditional approach proves as economical. Although the hot water heating with radiators is the most practical way of heating in prefabricated buildings, the under floor heating systems have greater and greater use. Today, prefabricated sanitary cabins have a huge use and they are much more economical in comparison to special panels for bathrooms that were once create. Approaches in terms of planning electrical installation are different, but for conventional constructed buildings, as well as prefabricated buildings, the use of lightweight prefabricated walls with embedded installations, today is recommended, when the room is loaded with a large number of this installations and if it is possible.

  2. A regulatory model for conformity evaluation in natural gas building installations; Um modelo regulatorio para avaliacao da conformidade das instalacoes prediais de gas natural

    Energy Technology Data Exchange (ETDEWEB)

    Fossa, Alberto Jose; Santos, Edmilson Moutinho dos [Universidade de Sao Paulo (USP), SP (Brazil). Inst. de Eletrotecnica e Energia

    2008-07-01

    The challenge of the Brazilian growth needs to consider necessarily the energy arrangements, and natural gas has relevant participation in this matter. The possibility of its end use that make possible an effective adequacy of our energy matrix must be supported by modern concepts of quality and conformity. In this particular, the program of 'Tecnologia Industrial Basica' (TIB), including concepts and application of conformity evaluation processes, is considered basic for the construction of a consistent gas market. This paper present the Brazilian reality related to TIB aspects and elements, from which it constructs a technician and regulatory building gas installations model proposal for a conformity evaluation program in the country. (author)

  3. Poultry farming buildings. Natural gas heating. Guidebook of installation rules; Batiments d`elevage avicole. Chauffage au gaz. Guide des regles d`installation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    The technical and economical performances of a poultry farm are greatly influenced by the mastery of ambient temperature during the first days of husbandry. The natural gas space heating installation must answer these requirements and also respect all safety rules concerning the personnel and the animals. In order to answer the questions of poultry farming professionals, the technical association of the natural gas industry (ATG) in France and the Groupama insurance company have redefined the new version of this brochure which integrates the recent technological advances and defines the minimum quality and safety rules required to achieve a natural gas heating installation. The different topics presented are: the gas supply (aerial fixed reservoirs), the general distribution panel (location, command systems, regulation systems for LPG installations, electrical equipments), the distribution pipes (general supply, indoor pipes, flexible pipes, pipe fittings), the heating systems (power, choice, power supply, fastening, air renewal), the check and sign and the start-up of the installation, the periodical control and maintenance operations. (J.S.)

  4. Regulations concerning the cooking installations using the natural gas in the bakeries and the cake shops of the shopping Centers; Reglementation des installations de cuisson au gaz naturel en boulangerie-patisserie dans les centres commerciaux

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-05-01

    This brochure presents the regulation relative to the cooking installations using the natural gas in bakeries and cake shops of the shopping Centers. Following the general regulation context, the guide presents the ovens which can be installed and the associated technical restraints. The necessary conditions for the buildings, the gas alimentation, the natural gas pipelines in the buildings and the installations conditions are also presented. Finally the guide presents the maintenance facilities obligations. (A.L.B.)

  5. The role of installers for thermo-technical installations when buying gas boilers

    Directory of Open Access Journals (Sweden)

    Jovičić Dragoljub

    2013-01-01

    Full Text Available This study presents the research of role installers for thermo-technical installations when buying gas boilers in the Serbian market. Considering the fact that installers are significantly different, they are grouped by specific, relevant characteristics. The research is focused on the evaluation of marketing mix instruments by nine identified segments of installers. Moreover, research has been explored deeper through conclusion installers about the most important and most credible sources of information on gas boilers. During the research were used secondary and primary data sources. Besides the research at the table, field research has been also done by unstructured personal communication. All collected data were analyzed in details and both hypothesis were tested, where one of them is partially confirmed, and another one fully confirm. Given results can be useful for marketers and their anticipation of demand. Also these results can be used for creating optimal marketing strategy in the Serbian market of gas boilers.

  6. Tolley's industrial and commercial gas installation practice

    CERN Document Server

    Hazlehurst, John

    2010-01-01

    This is the third of three essential reference volumes for those concerned with the installation and servicing of domestic and industrial gas equipment. This volume explains the basic principles underlying the practical and theoretical aspects of installing and servicing gas appliances and associated equipment, from the basics of combustion, to burners, pressure and flow, transfer of heat, controls, as well as materials and processes, electrical aspects, and metering and measuring devices. Covering both Natural Gas and Liquefied Petroleum Gas, the many illustrations and worked examples include

  7. Solar heating, cooling and domestic hot water system installed at Columbia Gas System Service Corporation, Columbus, Ohio

    Science.gov (United States)

    1980-01-01

    The solar energy system installed in the building has 2,978 sq ft of single axis tracking, concentrating collectors and provides solar energy for space heating, space cooling and domestic hot water. A 1,200,000 Btu/hour water tube gas boiler provides hot water for space heating. Space cooling is provided by a 100 ton hot water fired absorption chiller. Domestic hot water heating is provided by a 50 gallon natural gas domestic storage water heater. Extracts from the site files, specification references, drawings, installation, operation and maintenance instructions are included.

  8. Natural gas fuelling stations installation code

    Energy Technology Data Exchange (ETDEWEB)

    Barrigar, C; Burford, G; Adragna, M; Hawryn, S

    2004-07-01

    This Canadian Standard applies to natural gas fuelling stations that can be used for fleet and public dispensing operations. This document is divided into 11 sections that address the scope of the Standard; definitions and reference publications; general requirements; compressors; storage; dispensing; flow control devices; storage vessel dispatch and receiving; design, installation and testing of piping, tubing and fittings; and installation of vehicle refuelling appliances (VRAs) connected to storage piping. The most recent revision to the Standard includes requirements for indoor fuelling of natural gas vehicles. This Standard, like all Canadian Standards, was subject to periodic review and was most recently reaffirmed in 2004. tabs., figs.

  9. RA reactor building and installations; Zgrada 'RA' i instalacije

    Energy Technology Data Exchange (ETDEWEB)

    Badrljica, R; Sanovic, V; Skoric, M [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1985-08-15

    RA reactor building is made of reinforced concrete and bricks. It is closed facility with a limited number of controlled openings, doors and windows. The site of the building is 100 m above the sea level, 20 m above the mean Danube level and 8 m above the level of the neighbouring stream Mlaka. The building consists of three parts: central prismatic part, annex - surrounding the central part and the sanitary corridor. The biggest space is the reactor hall. In addition to the detailed description and drawings of the reactor building this documents includes design specifications of: electrical installation, water supply system, sewage system, ventilation and heating, gas and compressed air systems. A separate chapter is devoted to fire protection. Zgrada reaktora RA izgradjena je od armiranog betona i opeke, kao zatvoreni objekat ogranicenog broja kontolisanih otvora, sa ogranicenim brojem vrata i prozora. Plato na kojem je zgrada izgradjena nalazi se na 100 m nadmorske visine, na 20 m iznad srednjeg vodostaja Dunava i 8 m iznad nivoa obliznjeg potoka Mlaka. Zgrada se sastoji iz tri dela: sredisnjeg prizmaticnog dela, aneksa - prstenastog okvira sredisnog dela i sanitarnog propusnika. Pojedinacno najveci prostor zauzima reaktorska hala. Pored detaljnog opisa i plana zgrade, ovaj dokument sadrzi projekat elektricne instalacije, projekat vodovoda i kanalizacije, ventilacije i grejanja, instalacije gasa i komprimovanog vazduha. Posebno poglavlje posveceno je protivpozarnoj zastiti.

  10. Evaluation Of RSG-GAS Power Installed After 12 Years

    International Nuclear Information System (INIS)

    Mrsahala, Yan Bony

    2001-01-01

    The total power installed in RSG-GAS electric system less then 3 x 2500 KVA. Some of powers installed included are the never used loads, so the operationally total load installed that regularly operational and incidental are amount about 3700 KVA. In this condition, the capacity of power transformer installed 3 x 2500 KVA becomes larger. The influences of the numinous power are electric bill payment by RSG-GAS. The reduces power installed may be done as well as remember that some of the load not be operation so that the power consume for that facility could be cut off. The evaluation and calculation result gives some alternatively can be selected to minimize the electric bill payment

  11. Electro magnetic compatibility of cabling and wiring in buildings and installations

    OpenAIRE

    Steenstra, H.T.

    2008-01-01

    The thesis deals with the behaviour, with respect to EMC (Electro Magnetic Compatibility), of cabling and wiring in buildings and installations. Measurement and calculation methods are developed and applied to cabling in a large scale installation as well as to individual cables. Besides, the location and interconnection of conductors, especially concrete reinforcement, in a building is investigated. Finally a procedure is developed that is used to deal with EMC issues in a large installation...

  12. Improved gas installations and services. Phase 1: Analysis project. Part report

    International Nuclear Information System (INIS)

    Nielsen, K.J.

    1996-05-01

    As Danish gas companies receive a large number of complaints related to the installation and operation of gas installations it was suggested that a course for personnel should be established in order to raise the standard of services and installation requirements. The first phase of the described project was to evaluate the quality of the gas installers' services so as to determine which aspects of installation and services should be emphasized during such a course. Interviews were carried out and questionnaires (illustrated within the document) sent out to installaters etc. Recommendations include that the level of information given to customers should be raised, also in relation to maintenance, and that installation should be improved. Analyses of the degree of customers' satisfaction, of the nature of the quality of services etc. expected, subjects for further training in this area and details of the training system are dealt with

  13. Gas heat pump installation at Paderborn

    Energy Technology Data Exchange (ETDEWEB)

    1978-01-01

    A gas heat pump installation at the swimming pool and sport center in Paderborn, developed by Ruhrgas A.G. has a heat capacity of 4650 kW, the largest up to this time and recovers heat from ground water under the sport center, shower, and swimming pool effluent, and air exhausted from the swimming pool to provide 182% of the energy obtained from the natural gas alone. This compares with an 80% efficiency for a conventional boiler fired with natural gas. Natural gas consumption by the sport center has been reduced from 1.2 million m/sup 3/ y to 520,000 m/sup 3//y, a 56% savings. Three identical units each have an eight-cylinder, four-cycle, 253 kW-gas engine.

  14. MANAGEMENT OF GAS-AIR ENERGY INSTALLATION OF INDUSTRIAL ENTERPRISE

    Directory of Open Access Journals (Sweden)

    V. Y. Lobov

    2018-02-01

    Full Text Available Purpose. The goal of the work is to substantiate the issue of effective use of kinetic energy of gas-air flows used by the technological installation for generating electric power, which will allow developing a new control algorithm and creating new software for controlling the gas-air power plant. To test the adequacy of the developed control algorithms and software, to develop a laboratory gas-air power plant. Methodology. To investigate the distribution of air-gas mass in process plants used industrial plant simulation method performed in software SolidWorks Flow Simulation. The method of simulation allowed to develop a new control algorithm and create new software taking into account the basic technical requirements for the management of the gas-air power plant. To test the efficiency of the developed algorithms and control software for the gas-air power plant, a physical modeling method was used on a developed laboratory installation connected via a USB interface with a computer and has a virtual model of the SCADA system presented in the LabVIEW environment. Findings. Based on the modeling of gas-air flows on the developed mathematical model, the optimal ratios of pipeline sizes are rationally determined, the gas-air mixture costs necessary for the most efficient operation of the gas-air power plant, that is, in the working zone of the gas-air path, the generator screw contacts the most significant flows, providing the maximum effect rotation. The obtained results of research of gas-air flows of technological installations of an industrial enterprise in the software environment of SolidWorks Flow Simulation and on their basis the basic technical requirements for the management of a gas-air power plant are developed. An optimal control algorithm has been developed that enabled it to be introduced into the control scheme of a gas-air power plant with a microprocessor or a specialized microcontroller. Originality. New possibilities for

  15. Behavior in exploitation of gas-lift installations with differential valves. Pt. 2

    Energy Technology Data Exchange (ETDEWEB)

    Bodea, I; Truica, V

    1969-07-01

    In this second installment, charts of casing and tubing pressure are shown to illustrate how they can be used as diagnostic tools, both for continuous and intermittent gas-lift installations. The desirable conditions for continuous gas lift are constant casing and tubing pressures; for intermittent gas lift, cycles of equal length and intensity. After discussion of the possible flow regimes in the production tubing, it is shown that pressure gradient and temperature measurements can also be used as diagnostic tools. The basic rules for designing a continuous flow gas-lift installation by multipoint injection are given. Application of these principles in several wells has resulted in an increase in the oil production rate, a decrease in the gas requirement, and a reduction in the frequency of well pulling jobs. A well-designed installation can be expected to function trouble- free for 2 to 4 yr.

  16. Electro magnetic compatibility of cabling and wiring in buildings and installations

    NARCIS (Netherlands)

    Steenstra, H.T.

    2008-01-01

    The thesis deals with the behaviour, with respect to EMC (Electro Magnetic Compatibility), of cabling and wiring in buildings and installations. Measurement and calculation methods are developed and applied to cabling in a large scale installation as well as to individual cables. Besides, the

  17. Escalation scenarios initiated by gas explosions on offshore installations. Probabilistic cause and consequence modelling

    Energy Technology Data Exchange (ETDEWEB)

    Eknes, Monika Loeland

    1996-12-31

    This Dr. ing. thesis deals with escalation scenarios initiated by gas explosions on offshore installations. Gas explosions is one of the major hazards to such installations. The objectives were to estimate the probability of ignition and frequency of gas explosions for gas leaks on top sides of offshore installations, and to estimate the response and resistance of components that could result in escalation if they failed. Main fields considered cover risk analysis methodology, gas explosions, simplified escalation models, evaluation of structural consequences, case studies, and guidelines. 107 refs., 33 figs., 33 tabs.

  18. Building system technology with installation bus. Planning now for the future; Gebaeudesystemtechnik - mit Installationsbus. Heute schon an morgen denken

    Energy Technology Data Exchange (ETDEWEB)

    Vogt, D. [RWE Energie AG, Essen (Germany)

    1995-12-31

    In chapter 16 of the anthology about building technology the building system technology with installation bus is described. The following aspects are discussed: limits of the conventional electric installation, building system technology, building system technology - illusion or reality?; The European Installation Bus Association (EIBA). (BWI) [Deutsch] Kapitel 16 des Sammelbandes ueber Building Control ist dem Thema der Gebaeudesystemtechnik mit Installationsbus gewidmet. In diesem Zusammenhang werden folgende Themenbereiche angesprochen: Grenzen der konventionellen Elektroinstallation; Gebaeudesystemtechnik; Gebaeudesystemtechnik - Illusion oder Realitaet?; Die EIBA (European Installation Bus Association). (BWI)

  19. Investigation on Prefabricated Building System Skilled Component Installers

    Directory of Open Access Journals (Sweden)

    Nurul Rezuana Buyung

    2013-09-01

    Full Text Available In the face of an increasingly challenging era of globalization, skills and new equipments which includes prefabricated building components, known as Industrialized Building System (IBS has been introduced towards achievement of sustainable construction. IBS is a construction system in which the components are manufactured in a factory, on or off site, positioned and assembled into complete structures with minimal additional site work. IBS requires high construction precision and needs a higher skill level of workers. Compared to the conventional construction method, the skill level of IBS workers is more demanding. Although there are a lot benefits in implementing IBS, the construction industry still not rapidly implementing IBS. The IBS method still considered new and even though there are a lot of benefits it still faces barriers. In an IBS construction, the role of the contractor is shifted from a builder to an assembler on the site. Therefore, this requires the contractor to be prepared technologically with IBS knowledge and skills. It is generally perceived that the number of skilled IBS installers in Malaysia is still low even though the system has been implemented for a long time. This research is carried out to find out whether the existing number of IBS installer is sufficient. Primary data was collected by carrying out interviews with the contractors at the IBS construction site in Penang Island in order to get the contractor’s feedback regarding this issue. Meanwhile, the secondary data was collected from government agencies to get the number of existing IBS installer and the number of IBS projects done in government projects. The results from this study indicated that not all categories of skill workers are in shortage. However, the number of precast concrete installer is in a critical shortage.

  20. Measure Guideline. High Efficiency Natural Gas Furnaces

    Energy Technology Data Exchange (ETDEWEB)

    Brand, L. [Partnership for Advanced Residential Retrofit (PARR), Des Plaines, IL (United States); Rose, W. [Partnership for Advanced Residential Retrofit (PARR), Des Plaines, IL (United States)

    2012-10-01

    This measure guideline covers installation of high-efficiency gas furnaces, including: when to install a high-efficiency gas furnace as a retrofit measure; how to identify and address risks; and the steps to be used in the selection and installation process. The guideline is written for Building America practitioners and HVAC contractors and installers. It includes a compilation of information provided by manufacturers, researchers, and the Department of Energy as well as recent research results from the Partnership for Advanced Residential Retrofit (PARR) Building America team.

  1. Measure Guideline: High Efficiency Natural Gas Furnaces

    Energy Technology Data Exchange (ETDEWEB)

    Brand, L.; Rose, W.

    2012-10-01

    This Measure Guideline covers installation of high-efficiency gas furnaces. Topics covered include when to install a high-efficiency gas furnace as a retrofit measure, how to identify and address risks, and the steps to be used in the selection and installation process. The guideline is written for Building America practitioners and HVAC contractors and installers. It includes a compilation of information provided by manufacturers, researchers, and the Department of Energy as well as recent research results from the Partnership for Advanced Residential Retrofit (PARR) Building America team.

  2. ATLAS Installation: Building a Modern-day "Ship in a Bottle"

    CERN Multimedia

    Eisenstein, R

    By now, almost everyone connected with the ATLAS project is aware of its tremendously exciting discovery potential for physics. ATLAS is designed both to search for an as-yet-undiscovered piece of the Standard Model - the Higgs boson - as well as to search for indications of possible new physics - such as Supersymmetry - that lie beyond it. It is just this excitement that has propelled more than 2000 physicists, engineers, technical workers and students from all over the world to commit a significant part of their research careers to this massive undertaking. As the sub-detector components of ATLAS continue to arrive regularly here at CERN, the magnitude - and the quality - of that commitment has become very real. Actual objects exist, in building 180 and other places around the CERN site, waiting for installation into the ATLAS cavern, UX15. That installation will begin next April when ATLAS takes delivery of the experimental hall and associated other buildings and underground structures at Point 1. Indeed,...

  3. Numerical model for stack gas diffusion in terrain with buildings. Variations in air flow and gas concentration with additional building near stack

    International Nuclear Information System (INIS)

    Sada, Koichi; Michioka, Takenobu; Ichikawa, Yoichi; Komiyama, Sumito; Numata, Kunio

    2009-01-01

    A numerical simulation method for predicting atmospheric flow and stack gas diffusion using a calculation domain of several km around a stack under complex terrain conditions containing buildings has been developed. The turbulence closure technique using a modified k-ε-type model without a hydrostatic approximation was used for flow calculation, and some of the calculation grids near the ground were treated as buildings using a terrain-following coordinate system. Stack gas diffusion was predicted using the Lagrangian particle model, that is, the stack gas was represented by trajectories of released particles. The developed numerical model was applied to a virtual terrain and building conditions in this study prior to the applications of a numerical model for real terrain and building conditions. The height of the additional building (H a ), located about 200 m leeward from the stack, was varied (i.e., H a =0, 20, 30 and 50 m), and its effects on airflow and the concentration of stack gas at a released height of 75 m were calculated. Furthermore, effective stack height, which was used in the safety analysis of atmospheric diffusion for nuclear facilities in Japan, was evaluated from the calculated ground-level concentration of stack gas. The cavity region behind the additional building was calculated, and turbulence near the cavity was observed to decrease when the additional building was present. According to these flow variations with the additional building, tracer gas tended to diffuse to the ground surface rapidly with the additional building at the leeward position of the cavity, and the ground-level stack gas concentration along the plume axis also increased with the height of the additional building. However, the variations in effective stack height with the height of the additional building were relatively small and ranged within several m in this study. (author)

  4. Installation of laboratory scale flue gas treatment system at ALURTRON, MINT

    International Nuclear Information System (INIS)

    Siti A'iasah Hashim; Khairul Zaman Dahlan; Zulkafli Ghazali; Khomsaton Abu Bakar, Ayub Muhamad

    2002-01-01

    A laboratory scale test rig to treat simulated flue gas using electron beam technology was installed at the Alurtron EB-irradiation center, MINT. The experiment test rig was proposed as a result of a feasibility studies conducted jointly by IAEA, MINT and TNB Research in 1997. The test rig system consisted of several components, among other, diesel generator, gas analyzers and spray cooler. The installation was completed and commissioned in October 2001. Results from the commissioning test runs and subsequent experimental work showed that the efficiency of the gas treatment is high. It was proven that electron beam technology might be applied in the treatment of air pollutants. This paper describes the design and work function of the individual major components as well as the full system function. Results from the initial experimental works are also presented. (Author)

  5. Large-scale building integrated photovoltaics field trial. First technical report - installation phase

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    This report summarises the results of the first eighteen months of the Large-Scale Building Integrated Photovoltaic Field Trial focussing on technical aspects. The project aims included increasing awareness and application of the technology, raising the UK capabilities in application of the technology, and assessing the potential for building integrated photovoltaics (BIPV). Details are given of technology choices; project organisation, cost, and status; and the evaluation criteria. Installations of BIPV described include University buildings, commercial centres, and a sports stadium, wildlife park, church hall, and district council building. Lessons learnt are discussed, and a further report covering monitoring aspects is planned.

  6. Decree 368/013 To grant to Resume Gas S A the concession to build and operate the pipeline linking the re gasification terminal Puntas de Sayago with Southern Cross Pipeline

    International Nuclear Information System (INIS)

    2013-01-01

    Terminal project to be installed in the Resume Tips by Resume Gas S A under Boot mode (Build, Operate, Own, Transfer) in order to receive liquefied natural gas, re gasify and injecting it into the transmission network in the country

  7. Low-voltage electrical installations in medical buildings - clinical centres and hospitals

    Directory of Open Access Journals (Sweden)

    Simić Ninoslav

    2015-01-01

    Full Text Available This paper presents the observations collected during the testing of electrical installations in medical buildings. The details of the power supply, wiring systems and the implemented systems of protection against electric shocks are described. The causes of some faults during the exploitation of the facilities are presented through practical examples, and the specific problem caused by water leaking through the insulation of electrical installations is explained in detail. It is pointed out how important maintenance, monitoring and application of the latest standards in this area are, as well as adequate training of professional staff.

  8. Bacterial community structures in air conditioners installed in Japanese residential buildings.

    Science.gov (United States)

    Hatayama, Kouta; Oikawa, Yurika; Ito, Hiroyuki

    2018-01-01

    The bacterial community structures in four Japanese split-type air conditioners were analyzed using a next-generation sequencer. A variety of bacteria were detected in the air filter of an air conditioner installed on the first floor. In the evaporator of this air conditioner, bacteria belonging to the genus Methylobacterium, or the family of Sphingomonadaceae, were predominantly detected. On the other hand, the majority of bacteria detected in the air filters and evaporators of air conditioners installed on the fifth and twelfth floors belonged to the family Enterobacteriaceae. The source of bacteria belonging to the family Enterobacteriaceae may have been aerosols generated by toilet flushing in the buildings. Our results suggested the possibility that the bacterial contamination in the air conditioners was affected by the floor level on which they were installed. The air conditioner installed on the lower floor, near the ground, may have been contaminated by a variety of outdoor bacteria, whereas the air conditioners installed on floors more distant from the ground may have been less contaminated by outdoor bacteria. However, these suppositions may apply only to the specific split-type air conditioners that we analyzed, because our sample size was small.

  9. Gas turbine installations in nuclear power plants in Sweden

    International Nuclear Information System (INIS)

    Sevestedt, Lars

    1986-01-01

    At each of the four nuclear power stations in Sweden (Ringhals, Forsmark, Oskarshamn, Barsebaeck) gas turbine generating sets have been installed. These units are normally used for peak load operation dictated of grid and System requirements but they are also connected to supply the electrical auxiliary load of the nuclear plant as reserve power sources. The gas turbines have automatic start capability under certain abnormal conditions (such as reactor trips, low frequency grid etc) but they can also be started manually from several different locations. Starting time is approximately 2- 3 minutes from start up to full load. (author)

  10. Gas turbine installations in nuclear power plants in Sweden

    Energy Technology Data Exchange (ETDEWEB)

    Sevestedt, Lars [Electrical Equipment and Gas Turbines, Swedish State Power Board, Ringhals Nuclear Power Plant, S-430 22 Vaeroebacka (Sweden)

    1986-02-15

    At each of the four nuclear power stations in Sweden (Ringhals, Forsmark, Oskarshamn, Barsebaeck) gas turbine generating sets have been installed. These units are normally used for peak load operation dictated of grid and System requirements but they are also connected to supply the electrical auxiliary load of the nuclear plant as reserve power sources. The gas turbines have automatic start capability under certain abnormal conditions (such as reactor trips, low frequency grid etc) but they can also be started manually from several different locations. Starting time is approximately 2- 3 minutes from start up to full load. (author)

  11. Performance evaluation of gas-power strategies for building energy conservation

    International Nuclear Information System (INIS)

    Gabbar, Hossam A.; Runge, Jason; Bondarenko, Daniel; Bower, Lowell; Pandya, Devarsh; Musharavati, Farayi; Pokharel, Shaligram

    2015-01-01

    Highlights: • Comparison of natural gas and hydrogen fuels for energy conservation in buildings. • Comparison between hydrogen and natural gas fuel cell is performed. • Simulations of building energy supply. • Performance evaluation of two potential gas-power supply scenarios in buildings. • Natural gas fuel cell showed better performance over hydrogen fuel cell. - Abstract: The work provided herein involves a comparison of natural gas and hydrogen fuels for the purpose of energy conservation for buildings via alternative energy generation methodologies. A case study simulation was developed for an average type of commercial building, a nine storey hotel located in Toronto. The two alternative energy source case studies involved the generation of hydrogen via the wind turbine for the fuel cell, and the use of natural gas directly in the steam reforming fuel cell. The simulations for both scenarios were run and the recorded results were compared to the original case study, as well as between the scenarios. To supply for the base load of the building the fuel cells were given the same kW rating for both scenarios. The identification of all existing technologies for hydrogen gas and natural gas has been carried out, and the similar technologies between the two gases were found. For the purpose of realism, only existing purchasable technologies were considered in this paper. Due to the lack of commercially available technologies for hydrogen gas, only a comparison of fuel cell systems could be accomplished. Over the course of the investigative work it was found that when there is no direct supply of hydrogen to the site of utilization, the natural gas fuel cell is beneficial to the building due to its greater efficiency and lower cost. The major drawback for the hydrogen gas fuel cell, when the on-site generation is involved, is that no thermal power extraction systems currently exist for purchase and utilization in the buildings

  12. An analysis of the performance of a 2.6 kWp building integrated photovoltaic installation

    International Nuclear Information System (INIS)

    Sulaiman Shaari

    2000-01-01

    This paper presents a summary of an analysis of the performance results of a 2.6 kWp Building integrated Photovoltaic (BIPV) installation. The building has fifty Siemens M55 photovoltaic (PV) modules integrated as part of the roof of the building, grid-interactive via an SMA inverter. Data have been compiled and a detailed analysis of its performance was done using a dedicated BIPV computer model called PVSYST2.0. It was found that the general performance of the system was at the lower end of the spectrum mainly due to inherent architectural design of the building. This came by way of shading on the modules casted by shadow: of existing roofs of the building, and adverse effects from temperature increases on the modules due to the heating regimes in the building and lack of ventilation of the modules. The problem was exacerbated by an inverter-to-PV size ratio mismatch. In addition there had been some teething problems during the earlier periods of operation. Lessons from this experience are drawn up to serve as a precautionary note in designing other BIPV installations, especially valuable for applications in tropical climate countries, like Malaysia. (Author)

  13. Analysis of Installed Measures and Energy Savings for Single-Family Residential Better Buildings Projects

    Energy Technology Data Exchange (ETDEWEB)

    Heaney, M. [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Polly, B. [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2015-04-30

    This report presents an analysis of data for residential single-family projects reported by 37 organizations that were awarded federal financial assistance (cooperative agreements or grants) by the U.S. Department of Energy’s Better Buildings Neighborhood Program.1 The report characterizes the energy-efficiency measures installed for single-family residential projects and analyzes energy savings and savings prediction accuracy for measures installed in a subset of those projects.

  14. The choice of primary energy source including PV installation for providing electric energy to a public utility building - a case study

    Science.gov (United States)

    Radomski, Bartosz; Ćwiek, Barbara; Mróz, Tomasz M.

    2017-11-01

    The paper presents multicriteria decision aid analysis of the choice of PV installation providing electric energy to a public utility building. From the energy management point of view electricity obtained by solar radiation has become crucial renewable energy source. Application of PV installations may occur a profitable solution from energy, economic and ecologic point of view for both existing and newly erected buildings. Featured variants of PV installations have been assessed by multicriteria analysis based on ANP (Analytic Network Process) method. Technical, economical, energy and environmental criteria have been identified as main decision criteria. Defined set of decision criteria has an open character and can be modified in the dialog process between the decision-maker and the expert - in the present case, an expert in planning of development of energy supply systems. The proposed approach has been used to evaluate three variants of PV installation acceptable for existing educational building located in Poznań, Poland - the building of Faculty of Chemical Technology, Poznań University of Technology. Multi-criteria analysis based on ANP method and the calculation software Super Decisions has proven to be an effective tool for energy planning, leading to the indication of the recommended variant of PV installation in existing and newly erected public buildings. Achieved results show prospects and possibilities of rational renewable energy usage as complex solution to public utility buildings.

  15. A reliability analysis of a natural-gas pressure-regulating installation

    International Nuclear Information System (INIS)

    Gerbec, Marko

    2010-01-01

    A case study involving analyses of the operability, reliability and availability was made for a selected, typical, high-pressure, natural-gas, pressure-regulating installation (PRI). The study was commissioned by the national operator of the natural-gas, transmission-pipeline network for the purpose of validating the existing operability and maintenance practices and policies. The study involved a failure-risk analysis (HAZOP) of the selected typical installation, retrieval and analysis of the available corrective maintenance data for the PRI's equipment at the network level in order to obtain the failure rates followed by an elaboration of the quantitative fault trees. Thus, both operator-specific and generic literature data on equipment failure rates were used. The results obtained show that two failure scenarios need to be considered: the first is related to the PRI's failure to provide gas to the consumer(s) due to a low-pressure state and the second is related to a failure of the gas pre-heating at the high-pressure reduction stage, leading to a low temperature (a non-critical, but unfavorable, PRI state). Related to the first scenario, the most important cause of failure was found to be a transient pressure disturbance back from the consumer side. The network's average PRI failure frequency was assessed to be about once per 32 years, and the average unavailability to be about 4 minutes per year (the confidence intervals were also assessed). Based on the results obtained, some improvements to the monitoring of the PRI are proposed.

  16. A reliability analysis of a natural-gas pressure-regulating installation

    Energy Technology Data Exchange (ETDEWEB)

    Gerbec, Marko, E-mail: marko.gerbec@ijs.s [Jozef Stefan Institute, Jamova 39, 1000 Ljubljana (Slovenia)

    2010-11-15

    A case study involving analyses of the operability, reliability and availability was made for a selected, typical, high-pressure, natural-gas, pressure-regulating installation (PRI). The study was commissioned by the national operator of the natural-gas, transmission-pipeline network for the purpose of validating the existing operability and maintenance practices and policies. The study involved a failure-risk analysis (HAZOP) of the selected typical installation, retrieval and analysis of the available corrective maintenance data for the PRI's equipment at the network level in order to obtain the failure rates followed by an elaboration of the quantitative fault trees. Thus, both operator-specific and generic literature data on equipment failure rates were used. The results obtained show that two failure scenarios need to be considered: the first is related to the PRI's failure to provide gas to the consumer(s) due to a low-pressure state and the second is related to a failure of the gas pre-heating at the high-pressure reduction stage, leading to a low temperature (a non-critical, but unfavorable, PRI state). Related to the first scenario, the most important cause of failure was found to be a transient pressure disturbance back from the consumer side. The network's average PRI failure frequency was assessed to be about once per 32 years, and the average unavailability to be about 4 minutes per year (the confidence intervals were also assessed). Based on the results obtained, some improvements to the monitoring of the PRI are proposed.

  17. Optimum Installation of Sorptive Building Materials Using Contribution Ratio of Pollution Source for Improvement of Indoor Air Quality.

    Science.gov (United States)

    Park, Seonghyun; Seo, Janghoo

    2016-04-01

    Reinforcing the insulation and airtightness of buildings and the use of building materials containing new chemical substances have caused indoor air quality problems. Use of sorptive building materials along with removal of pollutants, constant ventilation, bake-out, etc. are gaining attention in Korea and Japan as methods for improving such indoor air quality problems. On the other hand, sorptive building materials are considered a passive method of reducing the concentration of pollutants, and their application should be reviewed in the early stages. Thus, in this research, activated carbon was prepared as a sorptive building material. Then, computational fluid dynamics (CFD) was conducted, and a method for optimal installation of sorptive building materials was derived according to the indoor environment using the contribution ratio of pollution source (CRP) index. The results show that a method for optimal installation of sorptive building materials can be derived by predicting the contribution ratio of pollutant sources according to the CRP index.

  18. Solar-energy landmark Building-Columbia, Missouri

    Science.gov (United States)

    1981-01-01

    Report includes design, cost, installation, maintenance, and performance details for attractive solar installation which supplies space heating for four-story Visitors Center. 176 hydronic flat-plate collectors, water-to-water heat exchanger, and 5,000-gallon storage tank comprise system which provides 71 percent of building's heat. Natural-gas-fired boiler supplies auxiliary hot water to heating system when necessary.

  19. Relevant aspects in licensing of radioactive installations at petroleum and gas well logging

    International Nuclear Information System (INIS)

    Miranda, Marcia Valeria da E. Sa

    2002-01-01

    The importance of the various factors considered during the process of licensing of radioactive installation for petroleum and gas well logging. This process involves the issuing of some public power acts, the co called Administrative Acts. For the radioactive installations the Administrative Acts are related to the Norm CNEN-NE-6.02 'Licensing of Radioactive Installation'. In the conduction of the licensing of radioactive installation of mobile nuclear measurement devices the safety evaluation of radioactive installation and equipment containing incorporated radiation source are included; certification of radioprotection supervisors; programing and evaluation of the radioprotection inspections; and the conduction of conformal inspection according to the project, safety analysis and audits. An evaluation of the impact of the importance grade attributed to each factor in the optimization of licensing process is related. Finally, the prediction of implantation of a control system for the displacement of radioactive sources in the installation is approached comprehending the up-to-date localization of each source at different work front of the Basis

  20. A new gas stripper system for BARC-TIFR Pelletron Accelerator facility: installation and preliminary results

    International Nuclear Information System (INIS)

    Sharma, S.C.; Ninawe, N.G.; Yadav, M.L.; Ekambaram, M.; Ramjilal; Matkar, U.V.; Ansari, Q.N.; Lokare, R.N.; Ramlal; Gupta, A.K.; Bhagwat, P.V.; Pillay, R.G.

    2009-01-01

    The gas-stripper plays a key role in stripping the heavy and molecular ion beams in a tandem accelerator. Efficiency of gas stripper depends on its supporting vacuum pumps. A new recirculating turbo molecular pump-based gas stripper has been installed in the high voltage terminal of Pelletron Accelerator. Re-circulating the stripper gas reduces the flow of gas into the accelerating tubes reducing the transmission losses. Preliminary results obtained using the new gas stripper system are discussed. (author)

  1. Low frequency noise and air vibration generated by a simple cycle gas turbine installation

    Energy Technology Data Exchange (ETDEWEB)

    Giesbrecht, C.; Hertil, S. [ATCO Noise Management, Calgary, AB (Canada)

    2005-07-01

    Low-frequency noise refers to infrasound whose frequency is lower than the minimum human audible frequency of about 20 Hz. Recently, there have been serious complaints on noise pollution in the frequency range of 1-100 Hz. This presentation outlined ASHRAE noise criteria regions and discussed human perceptions to vibration. It also presented methods that ATCO used for measuring noise at a simple gas turbine installation, inside the site at the administration buildings, at the paths of vibration and noise propagation, and at noise sensitive receptors. A 70 dBC at the closes noise-sensitive receptor was used as a noise limit to minimize annoyance. In addition, 96 dBC was measured at 400 feet. It was noted that reducing the C-weighted sound level depends on reducing the stack noise emissions in the 16 and 31.5 band levels. ATCO evaluated silencer designs and recommended reactive silencers to achieve a 10 dB reduction in noise emitted by the 3 exhaust stacks. 6 figs.

  2. Greenhouse gas emission for co-generation installation - reduction and selling

    International Nuclear Information System (INIS)

    Manev, S.; Stankov, N.; Asenov, A.

    2005-01-01

    According to Kyoto protocol countries which have the availability to buy green house gas emissions from other countries could be made by means of realization of investment project. In this article the authors review the necessary scope of work which have to be done in order particular project for co-generation installation to be realized, according the requirement and their own experience in this field

  3. Installation of the Ferranti Mercury computer in building 2 on 30 June 1958

    CERN Multimedia

    1958-01-01

    The Ferranti Mercury was CERN's first "central" computer. It was installed in building 2 on 30 June 1958. The Mercury's performance did not compare to the simplest of today's pocket calculators. Its clock speed was a modest 1 MHz and its RAM capacity was 2000 20-bit words.

  4. Gas explosion in domestic buildings. The vented gas explosion[sub][/sub

    Directory of Open Access Journals (Sweden)

    Tadeusz Chyży

    2014-08-01

    Full Text Available In this paper, the basic information, related to the so-called vented gas explosion, has been presented. The vented explosion it is an explosion, during which the destruction of the weakest elements of the structure occurs. Through the resulting holes (decompressing surfaces can flow both combustion products and non-burned gas mixture. In consequence, reduction of the maximum explosion pressure[i] P[sub]red [/sub][/i] may be significant. Often, a gas explosion occurs inside residential buildings. In this case, natural vents are window and door openings.[b]Keywords[/b]: gas, explosion, combustion, explosion vents

  5. U. S. EPA voluntary programs and the oil and gas industry : Natural Gas STAR and Energy STAR Buildings Partnership

    International Nuclear Information System (INIS)

    Gunnung, P.

    2000-01-01

    The structure of two EPA programs directed towards wasted energy in buildings, reducing emissions, increasing energy efficiency and maximizing profits are described. The programs are based on a partnership approach between EPA and participants, and involve elements of plans and performance benchmarks, an integrated approach and communications and demonstration of successful initiatives. EPA provides planning and technical support in the form of a website, software tools, manuals, electronic sources and a purchasing tool kit. The Energy STAR Building Partnership has over 3,000 participants, and can boast of a cumulative saving of over $ 1.4 billion in energy bills and carbon dioxide emission reduction of 44.1 billion pounds, resulting from efficiency upgrades. The Natural Gas Partnership between the EPA and the oil and natural gas industry to cost effectively reduce methane emissions from the production, transmission, and distribution of natural gas also has had a number of successful initiatives such as replacement or retrofit of high bleed pneumatic devices, installation of flash tank separators on glycol dehydrators and other partner-reported projects such as replacement of wet seals with dry seals on compressors and connecting glycol pump to vapour recovery unit. As a results of these and other initiatives, annual methane emission was reduced by 22.2 bcf in 1998 as opposed to 3.4 bcf prior to the beginning of the program in 1993. Approximately 67 per cent of all reductions can be attributed to partner innovation. Overall assessment is that the program is innovative, achieves both economic and environmental goals, facilitates government and industry cooperation and is living proof that non-regulatory, cooperative programs work

  6. Assessing the safety aspects for use of multilayer pipes in gas distribution of domestic installation; Avaliacao dos aspectos de seguranca para utilizacao de tubos multicamada em instalacoes de distribuicao de gas em residencias

    Energy Technology Data Exchange (ETDEWEB)

    Bratfisch, Carlos do Amaral Coutinho [Bratfisch - Engenharia em Gas, Sao Paulo, SP (Brazil); Emmeti, Sao Paulo, SP (Brazil); Collela, Ricardo [FGS Brasil Industria e Comercio Ltda., Cotia, SP (Brazil)

    2012-07-01

    The gas distribution networks average flow at the Brazilian market is low and the operating pressure is less than 2.0 kgf/cm{sup 2}. These values are lower if compared to other countries and due this, gas distribution companies, major builders and developers have started a movement to find alternatives to reduce their installation costs, and they have identified in other countries the multilayer system. Because of the great interest of the consumer market for this alternative, and since there is no standards in Brazil that could regulate it, a technical committee was established under the ABNT in order to prepare a standard draft meeting the local market particularities as well this technology requirements. Then it was initiated a quest looking for the knowledge of the 'state of the art' of this technology in various locations around the world, especially Europe, Asia and Oceania, which shows that, with few exceptions, the knowledge of this alternative is still on the beginning, and even in countries where this system is a pioneer some doubts exist with respect to their usage limit. The multilayer system materials were already used at hot and cold water networks for more than twelve years, but only after that it was made an adaptation for building installations of gas distribution networks. Due the need to search and establish safety criteria both with respect to the product as its installation shape, did the necessary motivation to perform a more detailed study of this new technology, meeting the needs of this market. The intention is to present to the consumer market a series of comparative data definitions and techniques to identify this as a modern, updated, economic, efficient and safe alternative option for gas distribution networks. (author)

  7. Optimizing design concepts for a building with photovoltaic facility; Systeme d'optimisation pour la conception d'un batiment avec une installation photovoltaique

    Energy Technology Data Exchange (ETDEWEB)

    Le Bail, Yann; Bedard, Claude [Departement du genie de la construction, ETS, Montreal (Canada); Zmeureanu, Radu [Departement du genie du batiment, civil et de l' environement, Universite de Concordia, Montreal (Canada)

    2010-07-01

    In Canada, the energy used in buildings represents 30% of total national consumption. The use of renewable sources of energy is clearly of interest in efforts to reduce dependency on fossil fuels, greenhouse gas emissions and the total level of energy consumption. This study presents a system for economic and environmental performance optimization of a photovoltaic apparatus installed on the roof of a commercial building. This optimization system was tested on a building in Montreal. The results demonstrate that the apparatus does not give sufficient returns either economically or environmentally in Quebec, due to the fact that the electricity supply there is low-priced and clean but it would provide such returns in Munich, where the repurchase price of photovoltaic and conventional electricity is high and conventional electricity is also a polluter. The optimization system proposed in this study allows the environmental and economic returns from a photovoltaic apparatus to be studied.

  8. Teachers' and Students' Perception of Instructional Supervision on Capacity Building in Electrical Installation Trade

    Science.gov (United States)

    Eze, Ogwa Christopher

    2015-01-01

    This research was conducted to ascertain teachers' and students perception of instructional supervision in relation to capacity building in electrical installation trade in technical colleges. Three research questions and a null hypothesis were employed to guide the study. Descriptive survey was adopted. A 23-item questionnaire was used to elicit…

  9. Liquefied natural gas storage at Ambergate

    Energy Technology Data Exchange (ETDEWEB)

    Higton, C W; Mills, M J

    1970-08-19

    Ambergate works was planned in 1965-1966 and the decision was taken to install 4 ICI lean gas reformers using natural gas as feedstock, fuel, and enrichment. To cover the possible failure of natural gas supplies, petroleum distillate would be used as alternative feedstock and fuel. The choice for alternative enrichment lay between LPG or LNG. Since LNG would provide peak-on-peak storage facilities for either the East Midlands Board or the Gas Council when conversion was completed--and in the meantime would provide an additional source of LNG for local requirements when temporary LNG installations were used during conversion--agreement was reached with the Gas Council for it to build a 5,000-ton storage installation at Ambergate. The installation consists of 3 major sections: (1) the offloading bay and storage tank; (2) the reliquefaction system; and (3) the export system. The offloading bay and storage tank are for the reception and storage of liquefied Algerian natural gas, delivered to Ambergate by road tanker from the Canvey Is. Terminal. The reliquefaction system is to maintain the necessary storage tank conditions by reliquefying the boil-off natural gas. The export system delivers LNG from the storage tank at high pressure through a vaporization section in the national methane grid.

  10. A Chronology of Attacks on and Unlawful Interferences with, Offshore Oil and Gas Installations, 1975 – 2010

    Directory of Open Access Journals (Sweden)

    Mikhail Kashubsky

    2011-12-01

    Full Text Available Throughout its history, the oil and gas industry has been a subject of environmental protests, labour disputes, tensions with local communities, and it has also been a target of various violent activities ranging from vandalism to political violence, which have impinged on the security of oil industry workers and interfered with operational activities of oil companies on numerous occasions. Although a considerable number of attacks on oil and gas infrastructure occurred over the course of the industry’s existence, most of those attacks were directed against onshore petroleum targets. Compared to onshore petroleum infrastructure, attacks on offshore oil and gas installations are relatively rare. The following chronology provides details of attacks, unlawful interferences, and security incidents involving offshore oil and gas installations that happened between 1975 and 2010. 

  11. Development of a unified sizing method for gas radiation heating facilities used in large-volume buildings; Developpement d'une methode de dimensionnement unifiee d'installations de chauffage radiant gaz pour les batiments de grand volume

    Energy Technology Data Exchange (ETDEWEB)

    Jimenez, M.; Bego, L.; Douls, Y.; Le Dean, P.; Paradowski, V. [Gaz de France, GDF, Dir. de la Recherche, 75 - Paris (France)

    2000-07-01

    Builders now have perfect command of the natural gas heating technique used for large-volume buildings. However, the sizing of heating facilities still leaves grounds for discussion, whatever the energies actually used. Accordingly, between 1997 and 1999, the ATG (technical association of the Gas industry in France), seven French manufacturers of 'large volume' heating equipment, the Chaleur Et Rayonnement (CER) association and Gaz de France decided to collaborate and develop a 'unified sizing method' for heating facilities using radiating emitters. During the first year of the study, the above partners worked on the said method (theoretical thermal study of the radiative phenomena, and then adaptation to the methods currently used by the various manufacturers). In 1998, with the support of the ADEME (the French environment and energy control agency), the partners tested the method on five industrial buildings (studying the thermal behavior and making air renewal measurements with search gases). This work made it possible to either confirm or adapt the theoretical evaluations which had been made originally. In 1999, a software program was produced to make the developed method more user friendly. The program can be used to determine the power to be installed, but also to assess the quality of the chosen configuration of the emitters (unit power, inclination, orientation) for optimum customer comfort. (authors)

  12. Greenhouse gas emissions of pilot buildings in 2009-2011; Pilottikiinteistoejen kasvihuonekaasupaeaestoet vuosina 2009-2011

    Energy Technology Data Exchange (ETDEWEB)

    Riihimaki, M.

    2012-07-01

    The Julia 2030 use of premises project sought to reduce the greenhouse gas emissions of selected pilot buildings by 10 per cent over the period from 2009 to 2011 by changing patterns of use. The project also provided an opportunity for further refinement of a climate calculator developed and maintained by WWF for reckoning greenhouse gas emissions of this kind. The use of premises project covered a total of 32 pilot buildings in Helsinki, Espoo, Vantaa, Kauniainen, Kirkkonummi and Kerava. These buildings included nurseries and schools, swimming baths, offices, multi-purpose activity buildings, depots, a sports hall and a health centre. The combined greenhouse gas emissions of the pilot buildings in 2011 amounted to 10,416 tCO{sub 2}e, which was 8 per cent lower than the total of 11,293 tCO{sub 2}e recorded in 2009. This means that the project fell slightly short of its targeted 10 per cent reduction in greenhouse gas emissions. The total greenhouse gas emissions of the pilot buildings adjusted for heating requirement amounted to 10,733 tCO{sub 2}e in 2011, which was about 7 per cent lower than in 2009. Reckoned on a per capita basis for employees or visitors, the total greenhouse gas emissions adjusted for heating requirement fell in 25 buildings, but increased in seven buildings over the period from 2009 to 2011. Particularly significant emission reductions were achieved in Vantaa, where all buildings were able to cut their emissions by between 9 and 45 per cent. The principal cause of greenhouse gas emissions in the pilot buildings was heating consumption, which also accounts for the increase in their unadjusted greenhouse gas emissions over the cold winters of 2009 and 2010. The second most important emission source in the pilot buildings was electricity consumption. Air travel contributed significantly to the overall greenhouse gas emissions of the pilot buildings used by employees taking work-related flights, whereas the contribution of paper consumption and

  13. Gas centrifuge uranium enrichment programme in the United States of America

    International Nuclear Information System (INIS)

    Gestson, D.K.

    1983-01-01

    The technology of uranium enrichment using the gas centrifuge is fully proven as a result of over twenty years of research. The high performance of the centrifuge has been confirmed, and its reliability established, through detailed evaluation of a series of centrifuge designs. The baseline centrifuge for the Gas Centrifuge Enrichment Plant (GCEP) is now in commercial production by three qualified manufacturers. It will be ready for installation in GCEP on schedule. The GCEP construction is also on schedule, with two process buildings expected to start operation in 1988 and 1989. Development and demonstration of the Set IV advanced gas centrifuge is under way and it is expected to be ready for installation in Process Building 3 in early 1989. (author)

  14. An application of the gas-fired chilling and heating units to domestic houses

    Energy Technology Data Exchange (ETDEWEB)

    Choi, J.H.; Yang, Y.M.; Chae, J.M.; Bang, H.S.; Kwon, O.B.; Yoo, S.I.; Kim, T.H. [R and D Center, Korea Gas Co. (Korea); Lee, T.W.; Kim, T.H.; Kim, B.H.; Hwang, I.J.; Kim, J.Y.; Kim, C.D.; Park, S.J. [Korea Institute of Construction Technology (Korea)

    1999-10-01

    Following researches and considerations were performed in this study for an efficient application of gas-fired chilling and heating units to the residential buildings. (1) Status of domestic cooling and heating for residential building. (2) Various introduction schemes of outdoor unit. (3) Design exclusive area for the gas appliance and installation of it. (4) Ventilation of exhaust gas and heat. (5) Prepare the installation specifications or standards for gas-fired chilling and heating units. (6) Design technique of plumbing for cooling and heating. (7) Evaluation of unit's capacity considering the thermal load of domestic buildings. (8) Cooling and heating system with the unit. (9) Fundamental test for evaluation of applicability. (10) Actual design and construction of experimental house for an application and a demonstration of the developed gas units. (11) Field test for cooling and heating. (12) Evaluation of economic efficiency. (13) Establish a business potential. (14) Establishment of legal and systematic support, energy rate. (15) Troubleshooting in the course of development and application of the new gas appliance. 41 refs., 214 figs., 52 tabs.

  15. Solar heating and cooling of residential buildings: sizing, installation and operation of systems. 1980 edition

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-09-01

    This manual was prepared as a text for a training course on solar heating and cooling of residential buildings. The course and text are directed toward sizing, installation, operation, and maintenance of solar systems for space heating and hot water supply, and solar cooling is treated only briefly. (MHR)

  16. Experimental optimization of temperature distribution in the hot-gas duct through the installation of internals in the hot-gas plenum of a high-temperature reactor

    International Nuclear Information System (INIS)

    Henssen, J.; Mauersberger, R.

    1990-01-01

    The flow conditions in the hot-gas plenum and in the adjacent hot-gas ducts and hot-gas pipes for the high-temperature reactor project PNP-1000 (nuclear process heat project for 1000 MW thermal output) have been examined experimentally. The experiments were performed in a closed loop in which the flow model to be analyzed, representing a 60deg sector of the core bottom of the PNP-1000 with connecting hot-gas piping and diverting arrangements, was installed. The model scale was approx. 1:5.6. The temperature and flow velocity distribution in the hot-gas duct was registered by means of 14 dual hot-wire flowmeters. Through structural changes and/or the installation of internals into the hot-gas plenum of the core bottom offering little flow resistance coolant gas temperature differentials produced in the core could be reduced to such an extent that a degree of mixture amounting to over 80% was achieved at the entrance of the connected heat exchanger systems. Thereby the desired goal of an adequate degree of mixture of the hot gas involving an acceptable pressure loss was reached. (orig.)

  17. Buildings interoperability landscape - Draft

    Energy Technology Data Exchange (ETDEWEB)

    Hardin, Dave B. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Stephan, Eric G. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Wang, Weimin [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Corbin, Charles D. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Widergren, Steven E. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States)

    2015-02-01

    Buildings are an integral part of our nation’s energy economy. The advancement in information and communications technology (ICT) has revolutionized energy management in industrial facilities and large commercial buildings. As ICT costs decrease and capabilities increase, buildings automation and energy management features are transforming the small-medium commercial and residential buildings sectors. A vision of a connected world in which equipment and systems within buildings coordinate with each other to efficiently meet their owners’ and occupants’ needs, and where buildings regularly transact business with other buildings and service providers (such as gas and electric service providers) is emerging. However, while the technology to support this collaboration has been demonstrated at various degrees of maturity, the integration frameworks and ecosystems of products that support the ability to easily install, maintain, and evolve building systems and their equipment components are struggling to nurture the fledging business propositions of their proponents.

  18. Design/Installation and Structural Integrity Assessment of Bethel Valley Low-Level Waste collection and transfer system upgrade for Building 3092 (central off-gas scrubber facility) at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    1994-10-01

    This document describes and assesses planned modifications to be made to the Building 3092 Central Off-Gas Scrubber Facility of the Oak Ridge National Laboratory, Oak Ridge, Tennessee. The modifications are made in response to the requirements of 40CFR264 Subpart J, relating to environmental protection requirements for buried tank systems. The modifications include the provision of a new scrubber recirculation tank in a new, below ground, lined concrete vault, replacing an existing recirculation sump that does not provide double containment. A new buried, double contained pipeline is provided to permit discharge of spent scrubber recirculation fluid to the Central Waste Collection Header. The new vault, tank, and discharge line are provided with leak detection and provisions to remove accumulated liquid. Ne scrubber recirculation pumps, piping, and accessories are also provided. This assessment concludes that the planned modifications comply with applicable requirements of 40CFR264 Subpart J, as set forth in Appendix F to the Federal Facility Agreement, Docket No. 89-04-FF, covering the Oak Ridge Reservation. A formal design certification statement is included herein on Page 53, a certification covering the installation shall be executed prior to placing the modified facility into service

  19. Design and installation of earth energy systems

    Energy Technology Data Exchange (ETDEWEB)

    Loggia, S; Adragna, M; Coyle, S; Foley, C; Hawryn, S; Martin, A; McConnell, J [eds.

    2002-07-01

    This first edition of the Canadian Standards Association (CSA) Standard C448 Series, replaces CSA Standards CAN/CSA-C445-M92 entitled Design and Installation of Earth Energy Heat Pump Systems for Residential and Other Small Buildings, as well as C447-94 entitled Design and Installation of Earth Energy Heat Pump Systems for Commercial and Institutional Buildings. This standard document consists of three parts: (C448.1) Design and installation of earth energy systems for commercial and institutional buildings; (C448.2) Design and installation of earth energy systems for residential and small buildings; and, (C448.3) Design and installation of underground thermal energy storage systems for commercial and institutional buildings. In C448.1, the requirements applicable to any system falling within the scope of the C448 series were included. Alternative requirements for houses and small buildings were added in C448.2. It was noted that either standard may be implemented. The standards applicable to the intentional storage of energy in the earth for later use were presented in C448.3. This latter section includes a brief introduction on underground thermal energy storage (UTES). tabs.

  20. Air intake device for at least one stand-by aggregate installed in an emergency power supply building

    International Nuclear Information System (INIS)

    Stoll, A.; Schilling, R.

    1980-01-01

    Stand-by aggregates are installed in an energency power supply building in order to ensure the cooling of nuclear power plants during accidents. In order to assure the stand-by aggregates to be supplied with combustion air also in the case of fire, each stand-by aggregate is provided with two intake pipes for the combustion air, which are horizontally lead through the building wall on the opposite sides of the energency power supply building. Fire valves are incorporated in the inlet pipes, and one of them will always close in the case of fire. (orig.) [de

  1. Improvement to the gas cycle energy generating installations with heat recuperation

    International Nuclear Information System (INIS)

    Tilliette, Zephyr.

    1977-01-01

    Improvement to the gas cycle energy generating installations with heat recuperation, comprising a heat source, supplying a fluid at high temperature and pressure, an expansion turbine, at least one recuperator fitted to the turbine outlet, a cooler and compressor in series, the compressor returning the high pressure fluid to the source after heat exchange in the recuperator with the low pressure fluid from the turbine. It is characterised in that at least one steam generator is connected to the low pressure end of the recuperator [fr

  2. Troubleshooting during Installing Ubuntu Enterprise Cloud Supplement (3) to “Guidelines for Building a Private Cloud Infrastructure"

    DEFF Research Database (Denmark)

    Panatic, Zoran; Ali Babar, Muhammad

    2012-01-01

    This document provides supplemental material to the book “Guidelines for building a private cloud infrastructure”. This document describes the issues that can be expected during the different phases of the setup and installation of Ubuntu Enterprise Cloud. This document also contains some useful...

  3. Methane emission from naturally ventilated livestock buildings can be determined from gas concentration measurements

    DEFF Research Database (Denmark)

    Bjerg, B; Zhang, Guoqiang; Madsen, J

    2012-01-01

    Determination of emission of contaminant gases as ammonia, methane, or laughing gas from natural ventilated livestock buildings with large opening is a challenge due to the large variations in gas concentration and air velocity in the openings. The close relation between calculated animal heat pr...... to investigate the influence of feed composition on methane emission in a relative large number of operating cattle buildings and consequently it can support a development towards reduced greenhouse gas emission from cattle production.......Determination of emission of contaminant gases as ammonia, methane, or laughing gas from natural ventilated livestock buildings with large opening is a challenge due to the large variations in gas concentration and air velocity in the openings. The close relation between calculated animal heat...... ventilated, 150 milking cow building. The results showed that the methane emission can be determined with much higher precision than ammonia or laughing gas emissions, and, for methane, relatively precise estimations can be based on measure periods as short as 3 h. This result makes it feasible...

  4. Update of the database of photovoltaic installations in the UK

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, D.; Bruhns, H.

    1999-07-01

    The article describes an updated database of photovoltaic (PV) installations in the UK. The database contains more than 300 records representing over 40,000 photovoltaic installations with more than 100 buildings that use photovoltaic arrays. Figures show: (i) a chart of cumulative PV applications to date; (ii) a chart of cumulative installations in the database; (iii) the growth of Building Integrated PV installed to date; (iv) the cumulative growth of peak power of PV for buildings installed every year since 1985; (v) the distribution by application of all PV installations in the database and (vi) the various applications of PV installations.

  5. 78 FR 56944 - Pacific Gas and Electric Company; Humboldt Bay Independent Spent Fuel Storage Installation

    Science.gov (United States)

    2013-09-16

    ... process waste at the Humboldt Bay ISFSI will not significantly affect the quality of the human environment... NUCLEAR REGULATORY COMMISSION [Docket No. 72-27; NRC-2011-0115] Pacific Gas and Electric Company; Humboldt Bay Independent Spent Fuel Storage Installation AGENCY: Nuclear Regulatory Commission. ACTION...

  6. Building integrated photovoltaics

    NARCIS (Netherlands)

    Ritzen, M.J.; Vroon, Z.A.E.P.; Geurts, C.P.W.; Reinders, Angèle; Verlinden, Pierre; Sark, Wilfried; Freundlich, Alexandre

    2017-01-01

    Photovoltaic (PV) installations can be realized in different situations and on different scales, such as at a building level. PV installations at the building level can either be added to the building envelope, which is called building added PV (BAPV), or they can be integrated into the building

  7. Lightning protection system analysis at Multipurpose Reactor G A. Siwabessy building

    International Nuclear Information System (INIS)

    Teguh-Sulistyo

    2003-01-01

    Analysis to the part of lightning protection system at Multi Purpose Reactor GA Siwabessy (RSG-GAS) have been done. Observation examined the damage of some part of the earthing system caused by human error of chemically system. The analysis performed some assumptions and simulations to the points of lightning stroke. From this analysis obtained that the reactor building do not have vertical finial which can protect effectively to the whole reactor building and auxiliary building. Installing some new finials at some places are needed to protect building therefore the reactor building and auxiliary building well safe from lighting stroke

  8. Risk-targeted safety distance of reinforced concrete buildings from natural-gas transmission pipelines

    International Nuclear Information System (INIS)

    Russo, Paola; Parisi, Fulvio

    2016-01-01

    Natural-gas pipeline accidents mostly result in major damage even to buildings located far away. Therefore, proper safety distances should be observed in land use planning to ensure target safety levels for both existing and new buildings. In this paper, a quantitative risk assessment procedure is presented for the estimation of the annual probability of direct structural damage to reinforced concrete buildings associated with high-pressure natural-gas pipeline explosions. The procedure is based on Monte Carlo simulation and takes into account physical features of blast generation and propagation, as well as damage to reinforced concrete columns. The natural-gas jet release process and the flammable cloud size are estimated through SLAB one-dimensional integral model incorporating a release rate model. The explosion effects are evaluated by a Multi-Energy Method. Damage to reinforced concrete columns is predicted by means of pressure–impulse diagrams. The conditional probability of damage was estimated at multiple pressure–impulse levels, allowing blast fragility surfaces to be derived at different performance limit states. Finally, blast risk was evaluated and allowed the estimation of minimum pipeline-to-building safety distances for risk-informed urban planning. The probabilistic procedure presented herein may be used for performance-based design/assessment of buildings and to define the path of new natural-gas pipeline networks. - Highlights: • The safety of buildings against blast loads due to pipeline accidents is assessed. • A probabilistic risk assessment procedure is presented for natural-gas pipelines. • The annual risk of collapse of reinforced concrete building columns is evaluated. • Monte Carlo simulation was carried out considering both pipeline and column features. • A risk-targeted safety distance is proposed for blast strength class 9.

  9. Safety report concerning the reactor Pegase - volume 1 - Description of the installation - volume 2 - Safety of the installations

    International Nuclear Information System (INIS)

    Lacour, J.

    1964-01-01

    In the first volume: This report is a description of the reactor Pegase, given with a view to examine the safety of the installations. The Cadarache site at which they are situated is briefly described, in particular because of the consequences on the techniques employed for building Pegase. A description is also given of the original aspects of the reactor. The independent loops which are designed for full-scale testing of fuel elements used in natural uranium-gas-graphite reactor systems are described in this report, together with their operational and control equipment. In the second volume: In the present report are examined the accidents which could cause damage to the Pegase reactor installation. Among possible causes of accidents considered are the seismicity of the region, an excessive power excursion of the reactor and a fracture in the sealing of an independent loop. Although all possible precautions have been taken to offset the effects of such accidents, their ultimate consequences are considered here. The importance is stressed of the security action and regulations which, added to the precautions taken for the construction, ensure the safety of the installations. (authors) [fr

  10. Fort Carson Building 1860 Biomass Heating Analysis Report

    Energy Technology Data Exchange (ETDEWEB)

    Hunsberger, Randolph [National Renewable Energy Lab. (NREL), Golden, CO (United States); Tomberlin, Gregg [National Renewable Energy Lab. (NREL), Golden, CO (United States); Gaul, Chris [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-09-01

    As part of the Army Net-Zero Energy Installation program, the Fort Carson Army Base requested that NREL evaluate the feasibility of adding a biomass boiler to the district heating system served by Building 1860. We have also developed an Excel-spreadsheet-based decision support tool--specific to the historic loads served by Building 1860--with which users can perform what-if analysis on gas costs, biomass costs, and other parameters. For economic reasons, we do not recommend adding a biomass system at this time.

  11. Reliability Based assessment of buildings under earthquakes due to gas extraction

    NARCIS (Netherlands)

    Steenbergen, R.D.J.M.; Vrouwenvelder, A.C.W.M.

    2014-01-01

    In the northern part of the Netherlands over de last decades shallow earthquakes are induced due to large scale gas extraction from the Groningen gas field. Earthquakes occur due to the compaction of the reservoir rock, which leads to subsidence at surface and strain build-up in the reservoir rock

  12. Structural considerations for solar installers : an approach for small, simplified solar installations or retrofits.

    Energy Technology Data Exchange (ETDEWEB)

    Richards, Elizabeth H.; Schindel, Kay (City of Madison, WI); Bosiljevac, Tom; Dwyer, Stephen F.; Lindau, William (Lindau Companies, Inc., Hudson, WI); Harper, Alan (City of Madison, WI)

    2011-12-01

    Structural Considerations for Solar Installers provides a comprehensive outline of structural considerations associated with simplified solar installations and recommends a set of best practices installers can follow when assessing such considerations. Information in the manual comes from engineering and solar experts as well as case studies. The objectives of the manual are to ensure safety and structural durability for rooftop solar installations and to potentially accelerate the permitting process by identifying and remedying structural issues prior to installation. The purpose of this document is to provide tools and guidelines for installers to help ensure that residential photovoltaic (PV) power systems are properly specified and installed with respect to the continuing structural integrity of the building.

  13. Wood Pellet-Fired Biomass Boiler Project at the Ketchikan Federal Building

    Energy Technology Data Exchange (ETDEWEB)

    Tomberlin, Gregg [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2014-06-01

    Biomass boiler systems have existed for many years, but the technology has advanced in recent decades and can now provide automated and efficient operation for a relatively modest investment. Key advances in system monitoring and control allow for lower operating costs, since the control systems run all aspects of the boiler, including feed, load reduction and even tube cleaning. These advances have made such systems economical on a small scale in situations where inexpensive fuels like natural gas are not available. This creates an opportunity for building operators in remote, cold-climate locations to reduce the use of expensive fuels for heating buildings. GSA Region 10 installed the system at the federal building in Ketchikan, Alaska and submitted the project to the Green Proving Ground (GPG) program. GSA's GPG program contracted with the National Renewable Energy Laboratory (NREL) to assess the installation and the technology. The system serves as a demonstration to assess actual system efficiencies, as well as operating characteristics and financial benefits. In addition to installation and operational issues, the project team/researchers examined other issues, including fuel transportation costs, building energy savings, and overall economics.

  14. Cooling performance of a vertical ground-coupled heat pump system installed in a school building

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, Yujin; Lee, Jae-Keun; Jeong, Young-Man; Koo, Kyung-Min [Department of Mechanical Engineering, Pusan National University, San 30, Jangjeon-Dong, Kumjung-Ku, Busan 609-735 (Korea); Lee, Dong-Hyuk; Kim, In-Kyu; Jin, Sim-Won [LG Electronics, 391-2 Gaeumjeong-dong, Changwon City, Gyeongnam (Korea); Kim, Soo H. [Department of Nanosystems and Nanoprocess Engineering, Pusan National University, San 30, Jangjeon-Dong, Kumjung-Ku, Busan 609-735 (Korea)

    2009-03-15

    This paper presents the cooling performance of a water-to-refrigerant type ground heat source heat pump system (GSHP) installed in a school building in Korea. The evaluation of the cooling performance has been conducted under the actual operation of GSHP system in the summer of year 2007. Ten heat pump units with the capacity of 10 HP each were installed in the building. Also, a closed vertical typed-ground heat exchanger with 24 boreholes of 175 m in depth was constructed for the GSHP system. To analyze the cooling performance of the GSHP system, we monitored various operating conditions, including the outdoor temperature, the ground temperature, and the water temperature of inlet and outlet of the ground heat exchanger. Simultaneously, the cooling capacity and the input power were evaluated to determine the cooling performance of the GSHP system. The average cooling coefficient of performance (COP) and overall COP of the GSHP system were found to be {proportional_to}8.3 and {proportional_to}5.9 at 65% partial load condition, respectively. While the air source heat pump (ASHP) system, which has the same capacity with the GSHP system, was found to have the average COP of {proportional_to}3.9 and overall COP of {proportional_to}3.4, implying that the GSHP system is more efficient than the ASHP system due to its lower temperature of condenser. (author)

  15. Power and energy saving in buildings by distributed generation based on gas-engine systems

    Energy Technology Data Exchange (ETDEWEB)

    Arghandeh, R.; Amidpour, M.; Ghaffari, A. [Khaje Nasir Toosi Univ. of Technology, Tehran (Iran, Islamic Republic of). Joint Program of Energy Systems Engineering; Manchester Univ., Manchester (United Kingdom)

    2008-07-01

    Buildings consume high amounts of energy and produce high amounts of greenhouse gas (GHG) emissions. This paper discussed the use of gas cogeneration distributed generation (DG) technologies as a means of reducing energy consumption from buildings as well as energy losses from transmission lines in Iran. Energy sources and power generation systems were reviewed, and the economical benefits and energy savings resulting from the use of cogeneration systems were outlined. Actual rates of electricity consumption for Iran were estimated. Building power consumption was divided into the following 6 major sections: (1) lighting, (2) home appliances, (3) restaurant and cooking devices, (4) sports facilities, (5) utilities, and (6) electronics. Energy consumption criteria (ECC) and daily consumption charts (DCC) were used to plan and design the cogeneration systems. Energy balances, capital costs, and investment rates of return (IRR) were then calculated for 2 scenarios for a sample building. Results of the study showed that gas engine combined heat and power (CHP) DG systems are a reliable and economic technology for reducing energy consumption in buildings. The IRR of the CHP DG system for the sample building was achieved in 1 year. 13 refs., 10 tabs., 11 figs.

  16. Solar heating and hot water system installed at Municipal Building complex, Abbeville, South Carolina

    Science.gov (United States)

    1979-01-01

    Information on the solar energy system installed at the new municipal building for the City of Abbeville, SC is presented, including a description of solar energy system and buildings, lessons learned, and recommendations. The solar space heating system is a direct air heating system. The flat roof collector panel was sized to provide 75% of the heating requirement based on an average day in January. The collectors used are job-built with two layers of filon corrugated fiberglass FRP panels cross lapped make up the cover. The storage consists of a pit filled with washed 3/4 in - 1 1/2 in diameter crushed granite stone. The air handler includes the air handling mechanism, motorized dampers, air circulating blower, sensors, control relays and mode control unit. Solar heating of water is provided only those times when the hot air in the collector is exhausted to the outside.

  17. VERA 3.5 Installation Guide

    Energy Technology Data Exchange (ETDEWEB)

    Bartlett, Roscoe A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Baird, Mark L. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Berrill, Mark A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Kulesza, Joel A. [Univ. of Michigan, Ann Arbor, MI (United States); Mervin, Brenden T. [Electric Power Research Inst. (EPRI), Charlotte, NC (United States)

    2016-08-16

    This guide describes the structure and setup of the standard VERA development environment (VERA Dev Env) and standard VERA Third Party Libraries (TPLs) that need to be in place before installing many of the VERA simulation components. It describes everything from the initial setup on a new machine to the final build, testing, and installation of VERA components. The goal of this document is to describe how to create the directories and contents outlined in Standard VERA Dev Env Directory Structure and then obtain the remaining VERA source and build, test, and install any of the necessary VERA components on a given system. This document describes the process both for a development version of VERA and for a released tarball of the VERA sources.

  18. VERA 3.5 Installation Guide

    International Nuclear Information System (INIS)

    Bartlett, Roscoe A.; Baird, Mark L.; Berrill, Mark A.; Kulesza, Joel A.; Mervin, Brenden T.

    2016-01-01

    This guide describes the structure and setup of the standard VERA development environment (VERA Dev Env) and standard VERA Third Party Libraries (TPLs) that need to be in place before installing many of the VERA simulation components. It describes everything from the initial setup on a new machine to the final build, testing, and installation of VERA components. The goal of this document is to describe how to create the directories and contents outlined in Standard VERA Dev Env Directory Structure and then obtain the remaining VERA source and build, test, and install any of the necessary VERA components on a given system. This document describes the process both for a development version of VERA and for a released tarball of the VERA sources.

  19. Cost-effectiveness of solar energy in energy-efficient buildings

    International Nuclear Information System (INIS)

    Kessler, S.; Iten, R.; Vettori, A.; Haller, A.; Ochs, M.; Keller, L.

    2005-01-01

    This report for the Swiss Federal Office of Energy (SFOE) presents the results of a study that examined the potentials and restraints with respect to the use of solar energy in the new construction and refurbishment of residential buildings in Switzerland. The method used is based on a 'learning-curve' technique. The first part of the report deals with the development of prices for solar-collector installations from 1990 until now. The second part deals with today's costs and future developments up to the year 2030. A reference building is used as the basis for the comparison of eight system variants. A further eight variants combine solar technology with traditional heating installations such as oil, gas and wood boilers and heat-pumps. Scenarios for the market situation for solar energy in 2030 are discussed

  20. Solar Panel Installations on Existing Structures

    OpenAIRE

    Tim D. Sass; Pe; Leed

    2013-01-01

    The rising price of fossil fuels, government incentives and growing public aware-ness for the need to implement sustainable energy supplies has resulted in a large in-crease in solar panel installations across the country. For many sites the most eco-nomical solar panel installation uses existing, southerly facing rooftops. Adding solar panels to an existing roof typically means increased loads that must be borne by the building-s structural elements. The structural desig...

  1. SAFETY ALERT - Failure of brass non-return valves in gas point installations

    CERN Multimedia

    HSE Unit

    2016-01-01

    There have been three recent failures in brass non-return valves in separate high pressure gas point installations across CERN. Whilst each was in a different gas service, the visual nature of the failure has been similar.   In all three cases, these components were connected to stainless steel flexible connections and stainless steel pipework. From the metallurgical investigation of the failed component, it appears that the failure is linked to uncontrolled tightening, leading to a localised weakening resulting in premature failure when subjected to pressure. Lead levels in the examined components appear to be a contributing factor to the reduction in ductility but are not identified as the root cause. It has also not been possible to attribute failure to a particular batch of material. The Occupational Health & Safety and Environmental Protection Unit prescribes the following actions to be taken, aligned with the CERN Safety Rules: Verification of all brass non-return valves (prioritising...

  2. The photovoltaic power system of Geneva Palexpo Building 6; Installation photovoltaique sur la halle 6 de Geneva Palexpo

    Energy Technology Data Exchange (ETDEWEB)

    Keller, L.; Rhyner, R.

    2004-07-01

    A 70 kW photovoltaic installation has been constructed on the roof of the new Building 6 of Geneva Palexpo, a compound that hosts various conferences, exhibitions and sporting or other events, counting almost 1.5 million visitors a year, including the International Car Show, which alone attracts more than 700,000 visitors each year. The purpose of this installation is the indirect supply of recharging terminals for electric vehicles. The solar installation and the electric vehicle recharging terminals support an information campaign on solar energy and 'sustainable' mobility. For this purpose various explanatory signs have been placed inside the Geneva Palexpo halls and a promotional stand for renewable energy and 'sustainable' transport was placed inside the International Car Show 2003. This stand had some success: more than 4,000 people took part in the competition organised on this occasion. (author)

  3. Designing building energy efficiency programs for greenhouse gas reductions

    International Nuclear Information System (INIS)

    Blackhurst, Michael; Lima Azevedo, Ines; Scott Matthews, H.; Hendrickson, Chris T.

    2011-01-01

    Costs and benefits of building energy efficiency are estimated as a means of reducing greenhouse gas emissions in Pittsburgh, PA and Austin, TX. The analysis includes electricity and natural gas consumption, covering 75% of building energy consumption in Pittsburgh and 85% in Austin. Two policy objectives were evaluated: maximize GHG reductions given initial budget constraints or maximize social savings given target GHG reductions. This approach evaluates the trade-offs between three primary and often conflicting program design parameters: initial capital constraints, social savings, and GHG reductions. Results suggest uncertainty in local stocks, demands, and efficiency significantly impacts anticipated outcomes. Annual GHG reductions of 1 ton CO 2 eq/capita/yr in Pittsburgh could cost near nothing or over $20 per capita annually. Capital-constrained policies generate slightly less social savings (a present value of a few hundred dollars per capita) than policies that maximize social savings. However, sectors and end uses targeted for intervention vary depending on policy objectives and constraints. Optimal efficiency investment strategies for some end uses vary significantly (in excess of 100%) between Pittsburgh and Austin, suggesting that resources and guidance conducted at the national scale may mislead state and local decision-makers. Results are used to provide recommendations for efficiency program administrators. - Highlights: → We use public data to estimate local building energy costs, benefits and greenhouse gas reductions. → We use optimization to evaluate trade-offs between program objectives and capital constraints. → Local energy market conditions significantly influence efficiency expectations. → Different program objectives can lead to different effective investment strategies. → We reflect on the implications of our results for efficiency program design.

  4. Designing building energy efficiency programs for greenhouse gas reductions

    Energy Technology Data Exchange (ETDEWEB)

    Blackhurst, Michael, E-mail: mfb@andrew.cmu.edu [Department of Civil, Architectural and Environmental Engineering, University of Texas at Austin, 1 University Station C1752, Austin, TX 78712 (United States); Lima Azevedo, Ines, E-mail: iazevedo@cmu.edu [Department of Engineering and Public Policy, Carnegie Mellon University, 119 Porter Hall, Pittsburgh, PA 15213 (United States); Scott Matthews, H., E-mail: hsm@cmu.edu [Department of Engineering and Public Policy, Carnegie Mellon University, 119 Porter Hall, Pittsburgh, PA 15213 (United States); Department of Civil and Environmental Engineering, Carnegie Mellon University, 119 Porter Hall, Pittsburgh, PA 15213 (United States); Hendrickson, Chris T., E-mail: cth@andrew.cmu.edu [Department of Civil and Environmental Engineering, Carnegie Mellon University, 119 Porter Hall, Pittsburgh, PA 15213 (United States)

    2011-09-15

    Costs and benefits of building energy efficiency are estimated as a means of reducing greenhouse gas emissions in Pittsburgh, PA and Austin, TX. The analysis includes electricity and natural gas consumption, covering 75% of building energy consumption in Pittsburgh and 85% in Austin. Two policy objectives were evaluated: maximize GHG reductions given initial budget constraints or maximize social savings given target GHG reductions. This approach evaluates the trade-offs between three primary and often conflicting program design parameters: initial capital constraints, social savings, and GHG reductions. Results suggest uncertainty in local stocks, demands, and efficiency significantly impacts anticipated outcomes. Annual GHG reductions of 1 ton CO{sub 2} eq/capita/yr in Pittsburgh could cost near nothing or over $20 per capita annually. Capital-constrained policies generate slightly less social savings (a present value of a few hundred dollars per capita) than policies that maximize social savings. However, sectors and end uses targeted for intervention vary depending on policy objectives and constraints. Optimal efficiency investment strategies for some end uses vary significantly (in excess of 100%) between Pittsburgh and Austin, suggesting that resources and guidance conducted at the national scale may mislead state and local decision-makers. Results are used to provide recommendations for efficiency program administrators. - Highlights: > We use public data to estimate local building energy costs, benefits and greenhouse gas reductions. > We use optimization to evaluate trade-offs between program objectives and capital constraints. > Local energy market conditions significantly influence efficiency expectations. > Different program objectives can lead to different effective investment strategies. > We reflect on the implications of our results for efficiency program design.

  5. The principles involved in building an optimum system of magnetic gas analyzers

    Energy Technology Data Exchange (ETDEWEB)

    Tsai, A N; Sukhanov, S

    1980-01-01

    A short survey is given of magnetomechanical and thermo-magnetic gas analyzers for oxygen. It is noted that the principle of building magnetic gas analyzers that measure secondary phenomena has fact that disadvantages due to the fact that a gas analyzer uses galvanaomagnetic elements from Hall generators. The measurement range is 0-2% of the volume of 0/sub 2/ concentration, the accuracy class is 1 and the threshold sensitivity is .01 percent by volume.

  6. Improving Gas Furnace Performance: A Field and Laboratory Study at End of Life

    Energy Technology Data Exchange (ETDEWEB)

    Brand, L. [Partnership for Advanced Residential Retrofit (PARR), Des Plaines, IL (United States); Yee, S. [Partnership for Advanced Residential Retrofit (PARR), Des Plaines, IL (United States); Baker, J. [Partnership for Advanced Residential Retrofit (PARR), Des Plaines, IL (United States)

    2015-02-01

    In 2010, natural gas provided 54% of total residential space heating energy the U.S. on a source basis, or 3.5 Quadrillion Btu. Natural gas burned in furnaces accounted for 92% of that total, and boilers and other equipment made up the remainder. A better understanding of installed furnace performance is a key to energy savings for this significant energy usage. In this project, the U.S. Department of Energy Building America team Partnership for Advanced Residential Retrofit examined the impact that common installation practices and age-induced equipment degradation may have on the installed performance of natural gas furnaces over the life of the product, as measured by steady-state efficiency and annual efficiency. The team identified 12 furnaces of various ages and efficiencies that were operating in residential homes in the Des Moines, Iowa, metropolitan area and worked with a local heating, ventilation, and air conditioning contractor to retrieve furnaces and test them at the Gas Technology Institute laboratory for steady-state efficiency and annual efficiency. Prior to removal, system airflow, static pressure, equipment temperature rise, and flue loss measurements were recorded for each furnace as installed in the house.

  7. Sizewell 'B' cable installation

    International Nuclear Information System (INIS)

    Gemmell, D.R.

    1992-01-01

    N G Bailey and Co. Ltd., UK were awarded the contract for the procurement, manufacture, works testing, works finishing, supply, delivery, off-loading, storage, installation, site finishing, preservation, setting to work and site testing of the following; the main cable installation throughout the Station including the addition of the Radioactive Waste Building, earthing and lightning protection installation, cable supporting steelwork and carriers and glanding and termination of cables. The cabling installation comprises power distribution, control and instrumentation cabling including all the associated cabling accessories, terminal boxes and similar components. The way that the contract was set-up, awarded and is now being carried out is described. Planning and industrial relations have been key features of the contract. (Author)

  8. Bridging interpersonal installation art with tangible business modeling

    DEFF Research Database (Denmark)

    Mitchell, Robb

    2012-01-01

    This position paper introduces an exploration of what deploying physical artefacts to enliven discussions about business innovation has in common with building room sized mechanical installations to provoke social interaction.......This position paper introduces an exploration of what deploying physical artefacts to enliven discussions about business innovation has in common with building room sized mechanical installations to provoke social interaction....

  9. Relevant aspects in licensing of radioactive installations at petroleum and gas well logging; Aspectos relevantes no licenciamento de instalacoes radiativas em perfilagem de pocos de petroleo ou gas

    Energy Technology Data Exchange (ETDEWEB)

    Miranda, Marcia Valeria da E. Sa [Comissao Nacional de Energia Nuclear (CNEN), Rio de Janeiro, RJ (Brazil)

    2002-07-01

    The importance of the various factors considered during the process of licensing of radioactive installation for petroleum and gas well logging. This process involves the issuing of some public power acts, the co called Administrative Acts. For the radioactive installations the Administrative Acts are related to the Norm CNEN-NE-6.02 'Licensing of Radioactive Installation'. In the conduction of the licensing of radioactive installation of mobile nuclear measurement devices the safety evaluation of radioactive installation and equipment containing incorporated radiation source are included; certification of radioprotection supervisors; programing and evaluation of the radioprotection inspections; and the conduction of conformal inspection according to the project, safety analysis and audits. An evaluation of the impact of the importance grade attributed to each factor in the optimization of licensing process is related. Finally, the prediction of implantation of a control system for the displacement of radioactive sources in the installation is approached comprehending the up-to-date localization of each source at different work front of the Basis.

  10. Lietojumprogrammu instalāciju izveides risinājumi

    OpenAIRE

    Zālītis, Mārtiņš

    2010-01-01

    Bakalaura darbā „Lietojumprogrammu instalāciju izveides risinājumi” mērķis ir izanalizēt lietotājam draudzīgas un nedraudzīgas instalācijas, kā arī salīdzināt instalāciju veidošanas rīkus, norādot uz to stiprajām un vājajām pusēm. Lai izpētītu instalāciju izveides iespējas tiek izmantota tīmeklī pieejamā informācija, autora darbs ar instalāciju rīkiem un to novērtējums. Parādīta sarežģītas instalācijas uzbūve, kas izveidota ar NSIS instalāciju rīku, kuru arī autors atzīst par labāko risinājum...

  11. Radionuclides in produced water from Norwegian oil and gas installations - concentrations and bioavailability

    International Nuclear Information System (INIS)

    Eriksen, D.Oe.; Sidhu, R.; Stralberg, E.; Iden, K.I.; Hylland, K.; Ruus, A.; Roeyset, O.; Berntssen, M.H.G.; Rye, H.

    2006-01-01

    Substantial amounts of produced water, containing elevated levels of radionuclides (mainly 226 Ra and 228 Ra) are discharged to the sea as a result of oil and gas production on the Norwegian Continental Shelf. So far no study has assessed the potential radiological effects on marine biota in connection with radionuclide discharges to the North Sea. The main objective of the project is to establish radiological safe discharge limits for radium, lead and polonium associated with other components in produced water from oil and gas installations on the Norwegian continental shelf. This study reports results indicating that the presence of added chemicals such as scale inhibitors in produced water has a marked influence on the formation of radium and barium sulphates when produced water is mixed with sea water. Thus, the mobility and bioavailability of radium (and barium) will be larger than anticipated. Also, the bioavailability of food-borne radium is shown to increase due to presence of such chemicals. (author)

  12. High performance gas adsorption and separation of natural gas in two microporous metal-organic frameworks with ternary building units.

    Science.gov (United States)

    Wang, Dongmei; Zhao, Tingting; Cao, Yu; Yao, Shuo; Li, Guanghua; Huo, Qisheng; Liu, Yunling

    2014-08-14

    Two novel MMOFs, JLU-Liu5 and JLU-Liu6, are based on ternary building units and exhibit high adsorption selectivity for CO2, C2H6 and C3H8 over CH4, which is attributed to steric effects and host-guest interactions. These MMOFs are promising materials for gas adsorption and natural gas purification.

  13. Magnetic compatibility of standard components for electrical installations: Computation of the background field and consequences on the design of the electrical distribution boards and control boards for the ITER Tokamak building

    International Nuclear Information System (INIS)

    Benfatto, I.; Bettini, P.; Cavinato, M.; Lorenzi, A. De; Hourtoule, J.; Serra, E.

    2005-01-01

    Inside the proposed Tokamak building, the ITER poloidal field magnet system would produce a stray magnetic field up to 70 mT. This is a very unusual environmental condition for electrical installation equipment and limited information is available on the magnetic compatibility of standard components for electrical distribution boards and control boards. Because this information is a necessary input for the design of the electrical installation inside the proposed ITER Tokamak building specific investigations have been carried out by the ITER European Participant Team. The paper reports on the computation of the background magnetic field map inside the ITER Tokamak building and the consequences on the design of the electrical installations of this building. The effects of the steel inside the building structure and the feasibility of magnetic shields for electrical distribution boards and control boards are also reported in the paper. The results of the test campaigns on the magnetic field compatibility of standard components for electrical distribution boards and control boards are reported in companion papers published in these proceedings

  14. The Radon Gas in Underground Buildings in Clay Soils. The Plaza Balmis Shelter as a Paradigm.

    Science.gov (United States)

    Rizo Maestre, Carlos; Echarri Iribarren, Víctor

    2018-05-17

    In healthy buildings, it is considered essential to quantify air quality. One of the most fashionable indicators is radon gas. To determine the presence of this element, which is harmful to health, in the environment, the composition of the soil is studied. The presence of radon gas within a building depends both on the terrain in which it is located and on the composition of the materials of which it is composed, and not as was previously believed, only by the composition of the soil (whether granitic or not). Many countries are currently studying this phenomenon, including Spain where the building regulations regarding the accumulation of radon gas, do not list in their technical codes, the maximum dose that can a building can hold so that it is not harmful to people and the measures to correct excessive accumulation. Therefore, once the possible existence of radon in any underground building has been verified, regardless of the characteristics of the soil, the importance of defining and unifying the regulations on different levels of radon in all architectural constructions is evident. Medical and health science agencies, including the World Health Organization, consider that radon gas is a very harmful element for people. This element, in its gaseous state, is radioactive and it is present in almost soils in which buildings are implanted. Granitic type soils present higher levels of radon gas. Non-granitic soils have traditionally been considered to have very low radon levels. However, this paper demonstrates the relevant presence of radon in non-granitic soils, specifically in clayey soils, by providing the results of research carried out in the underground air raid shelter at Balmis Square in Alicante (Spain). The results of the measurements of radon accumulation in the Plaza Balmis shelter are five times higher than those obtained in a similar ungrounded building. This research addresses the constructive typology of an under-ground building and the radon

  15. Applications of the automatic meter reading techniques at the Brazilian gas domestic market; Application des techniques de releve automatique des compteurs sur le marche domestique Bresilien du gaz

    Energy Technology Data Exchange (ETDEWEB)

    Venancio, J.; Monteiro, F. [Comgas, Sao Paulo (Brazil); D' Oliveira, R.D. [ORBIS, Curitiba (Brazil)

    2000-07-01

    This article will describe applications of the automation and automatic meter reading techniques at the internal gas pipes installations design, considering residential and commercial buildings, and taking in account the tendency of rapid growth of the activities related to the natural gas industry in Brazil, as well as the recently development of new technologies that can be applied with affordable prices. It will be analysed the application of an automatic meter reading technology in a building of several floors in Sao Paulo, which gas installations design is being carried up, with be purpose of making a comparative cost-effectiveness study with the traditional constructive methods applied in Brazil. As a result, it will be purposed a new commercialization model for the gas in Brazil at the residential and commercial market. (authors)

  16. Safety report concerning the reactor Pegase - volume 1 - Description of the installation - volume 2 - Safety of the installations; Rapport de surete du reacteur pegase - tome 1 - Description des installations - tome 2 - Surete des installations

    Energy Technology Data Exchange (ETDEWEB)

    Lacour, J. [Commissariat a l' Energie Atomique, Saclay (France). Centre d' Etudes Nucleaires; Legoin, P. [S.E.M. Hispano-Suiza, 92 - Colombes (France)

    1964-07-01

    In the first volume: This report is a description of the reactor Pegase, given with a view to examine the safety of the installations. The Cadarache site at which they are situated is briefly described, in particular because of the consequences on the techniques employed for building Pegase. A description is also given of the original aspects of the reactor. The independent loops which are designed for full-scale testing of fuel elements used in natural uranium-gas-graphite reactor systems are described in this report, together with their operational and control equipment. In the second volume: In the present report are examined the accidents which could cause damage to the Pegase reactor installation. Among possible causes of accidents considered are the seismicity of the region, an excessive power excursion of the reactor and a fracture in the sealing of an independent loop. Although all possible precautions have been taken to offset the effects of such accidents, their ultimate consequences are considered here. The importance is stressed of the security action and regulations which, added to the precautions taken for the construction, ensure the safety of the installations. (authors) [French] Dans le volume 1: Ce rapport est une description du reacteur Pegase, afin d'examiner la surete des installations. Le site de CADARACHE ou elles sont situees, a ete sommairement decrit, en particulier, a cause des consequences sur les techniques mises en oeuvre pour la realisation de Pegase. Nous nous sommes egalement attache a decrire les aspects originaux du reacteur. Les boucles autonomes destinees a tester en vraie grandeur des elements combustibles de la filiere uranium naturel graphite-gaz, ainsi que leurs dispositifs de controle et d'exploitation, figurent egalement dans ce rapport. Dans le volume 2: Dans le present rapport, nous examinons des accidents pouvant endommager des installations du reacteur Pegase. Les origines d'accidents examines

  17. Safety report concerning the reactor Pegase - volume 1 - Description of the installation - volume 2 - Safety of the installations; Rapport de surete du reacteur pegase - tome 1 - Description des installations - tome 2 - Surete des installations

    Energy Technology Data Exchange (ETDEWEB)

    Lacour, J [Commissariat a l' Energie Atomique, Saclay (France). Centre d' Etudes Nucleaires; Legoin, P [S.E.M. Hispano-Suiza, 92 - Colombes (France)

    1964-07-01

    In the first volume: This report is a description of the reactor Pegase, given with a view to examine the safety of the installations. The Cadarache site at which they are situated is briefly described, in particular because of the consequences on the techniques employed for building Pegase. A description is also given of the original aspects of the reactor. The independent loops which are designed for full-scale testing of fuel elements used in natural uranium-gas-graphite reactor systems are described in this report, together with their operational and control equipment. In the second volume: In the present report are examined the accidents which could cause damage to the Pegase reactor installation. Among possible causes of accidents considered are the seismicity of the region, an excessive power excursion of the reactor and a fracture in the sealing of an independent loop. Although all possible precautions have been taken to offset the effects of such accidents, their ultimate consequences are considered here. The importance is stressed of the security action and regulations which, added to the precautions taken for the construction, ensure the safety of the installations. (authors) [French] Dans le volume 1: Ce rapport est une description du reacteur Pegase, afin d'examiner la surete des installations. Le site de CADARACHE ou elles sont situees, a ete sommairement decrit, en particulier, a cause des consequences sur les techniques mises en oeuvre pour la realisation de Pegase. Nous nous sommes egalement attache a decrire les aspects originaux du reacteur. Les boucles autonomes destinees a tester en vraie grandeur des elements combustibles de la filiere uranium naturel graphite-gaz, ainsi que leurs dispositifs de controle et d'exploitation, figurent egalement dans ce rapport. Dans le volume 2: Dans le present rapport, nous examinons des accidents pouvant endommager des installations du reacteur Pegase. Les origines d'accidents examines comprennent la seismicite

  18. Automated installation methods for photovoltaic arrays

    Science.gov (United States)

    Briggs, R.; Daniels, A.; Greenaway, R.; Oster, J., Jr.; Racki, D.; Stoeltzing, R.

    1982-11-01

    Since installation expenses constitute a substantial portion of the cost of a large photovoltaic power system, methods for reduction of these costs were investigated. The installation of the photovoltaic arrays includes all areas, starting with site preparation (i.e., trenching, wiring, drainage, foundation installation, lightning protection, grounding and installation of the panel) and concluding with the termination of the bus at the power conditioner building. To identify the optimum combination of standard installation procedures and automated/mechanized techniques, the installation process was investigated including the equipment and hardware available, the photovoltaic array structure systems and interfaces, and the array field and site characteristics. Preliminary designs of hardware for both the standard installation method, the automated/mechanized method, and a mix of standard installation procedures and mechanized procedures were identified to determine which process effectively reduced installation costs. In addition, costs associated with each type of installation method and with the design, development and fabrication of new installation hardware were generated.

  19. Statistical analysis of electromagnetic radiation measurements in the vicinity of GSM/UMTS base station installed on buildings in Serbia

    International Nuclear Information System (INIS)

    Koprivica, Mladen; Slavkovic, Vladimir; Neskovic, Natasa; Neskovic, Aleksandar

    2016-01-01

    As a result of dense deployment of public mobile base stations, additional electromagnetic (EM) radiation occurs in the modern human environment. At the same time, public concern about the exposure to EM radiation emitted by such sources has increased. In order to determine the level of radio frequency radiation generated by base stations, extensive EM field strength measurements were carried out for 664 base station locations, from which 276 locations refer to the case of base stations with antenna system installed on buildings. Having in mind the large percentage (42 %) of locations with installations on buildings, as well as the inevitable presence of people in their vicinity, a detailed analysis of this location category was performed. Measurement results showed that the maximum recorded value of total electric field strength has exceeded International Commission on Non-Ionizing Radiation Protection general public exposure reference levels at 2.5 % of locations and Serbian national reference levels at 15.6 % of locations. It should be emphasised that the values exceeding the reference levels were observed only outdoor, while in indoor total electric field strength in no case exceeded the defined reference levels. (authors)

  20. Energy Requirement and Comfort of Gas- and Electric-powered Hot-water Systems

    International Nuclear Information System (INIS)

    Luedemann, B.; Schmitz, G.

    1999-01-01

    In view of the continuous reduction in the specific heating energy demand of new buildings the power demand for hot-water supply increasingly dominates the heating supply of residential buildings. Furthermore, the German energy-savings-regulation 2000 (ESVO) is intended to evaluate the techniques installed such as domestic heating or hot-water supply within an overall energetic view of the building. Planning advice for domestic heating, ventilation and hot-water systems in gas-heated, low-energy buildings has therefore been developed in a common research project of the Technical University of Hamburg Harburg (TUHH) and four energy supply companies. In this article different gas-or electricity-based hot-water systems in one family houses and multiple family houses are compared with one another with regard to the aspects of comfort and power requirements considering the user's behaviour. (author)

  1. Second update of the database of photovoltaic installations in the UK

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, D; Bruhns, H

    2001-07-01

    This update of the database of photovoltaic (PV) installations in the UK developed by Altechnica for the Department of Trade and Industry has double the number of records of the previous edition, and focuses on the use of photovoltaic (PV) installations for buildings, for example using some form of a PV array, building integrated PV module, and building attached PV array. The growth in building related PV installations is examined along with the use of PV in telecommunication equipment, navigation buoys and light vessels, buildings, pumps for solar water heating systems, schools, lighthouses, and petrol stations. Details are given of the electronic data entry form for the database and the increase in the number of fields to allow additional information such as tilt angle and orientation area of the array to be added.

  2. Tunisia- British gas intends to participate to the building of a combined cycle electric power plant

    International Nuclear Information System (INIS)

    Anon.

    1996-01-01

    Here is described the project to build a combined-cycle power plant in Tunisia, project in which the British Gas is interested. The transport, distribution, import and export of electricity should be controlled by the Tunisian society of electricity and gas. In the context of an agreement with Gec-Alsthom, the british company hopes to offer to build, and exploit the future power plant. (N.C.)

  3. Installation dismantling system, working process and hood utilizable in this system

    International Nuclear Information System (INIS)

    Poirier, J.C.; Mulcey, P.; Morel, P.; Vavasseur, C.

    1989-01-01

    The system for dismantling an installation under a controlled atmosphere is made by a tool polluting the atmosphere, a gas blanket creating a continement zone around the tool, an extractor removing polluted gas from the zone, a purifier for the extracted gas and a controller regulating the flow of gas in the blanket and keeping the installation at constant pressure [fr

  4. Installed water resource modelling systems for catchment ...

    African Journals Online (AJOL)

    Following international trends there are a growing number of modelling systems being installed for integrated water resource management, in Southern Africa. Such systems are likely to be installed for operational use in ongoing learning, research, strategic planning and consensus-building amongst stakeholders in the ...

  5. Worlds meet in Building 180.

    CERN Multimedia

    Raphael Vuillermet

    In the assembly hall of Building 180, several teams of various nationalities and different countries work together for the ATLAS forward muon detector. For nearly two years, Americans, Chinese, Europeans, Israelis, Japanese, Pakistanis and Russians are assembling and testing the so-called "Big Wheels" and the muon EIL4 stations. Each team is independent in its tasks: one team is assembling the mechanical structure, another one is installing services and muon chambers, while a third is testing the electronics and the gas system. A team is in charge of the transport and storage of the sectors and another is assembling the sectors in the ATLAS cavern. A total of nearly 60 people are participating in this project. Some members for the ATLAS Big Wheel team in the assembly hall of building 180. People from different cultures and religions and with different mother tongues are working side by side in harmony. Everyone in building 180, from technicians to professors, has the opportunity to meet and work with...

  6. STOCHASTIC AND GEOMETRIC REASONING FOR INDOOR BUILDING MODELS WITH ELECTRIC INSTALLATIONS – BRIDGING THE GAP BETWEEN GIS AND BIM

    Directory of Open Access Journals (Sweden)

    Y. Dehbi

    2017-10-01

    Full Text Available 3D city and building models according to CityGML encode the geometry, represent the structure and model semantically relevant building parts such as doors, windows and balconies. Building information models support the building design, construction and the facility management. In contrast to CityGML, they include also objects which cannot be observed from the outside. The three dimensional indoor models characterize a missing link between both worlds. Their derivation, however, is expensive. The semantic automatic interpretation of 3D point clouds of indoor environments is a methodically demanding task. The data acquisition is costly and difficult. The laser scanners and image-based methods require the access to every room. Based on an approach which does not require an additional geometry acquisition of building indoors, we propose an attempt for filling the gaps between 3D building models and building information models. Based on sparse observations such as the building footprint and room areas, 3D indoor models are generated using combinatorial and stochastic reasoning. The derived models are expanded by a-priori not observable structures such as electric installation. Gaussian mixtures, linear and bi-linear constraints are used to represent the background knowledge and structural regularities. The derivation of hypothesised models is performed by stochastic reasoning using graphical models, Gauss-Markov models and MAP-estimators.

  7. Update on Geothermal Direct-Use Installations in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Beckers, Koenraad J [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Young, Katherine R [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Snyder, Diana M. [Georgia State University

    2017-02-15

    Direct-use of geothermal energy currently has limited penetration in the United States, with an estimated installed capacity of about 500 MWth, supplying on the order of 0.01% of the total annual U.S. heat demand (about 30 EJ). We see higher penetration levels in other countries such as Iceland (about 90%) and Hungary (2.5%). An updated database of geothermal direct-use systems in the U.S. has been compiled and analyzed, building upon the Oregon Institute of Technology (OIT) Geo-Heat Center direct-use database. Types of directuse applications examined include hot springs resorts and pools, aquaculture farms, greenhouses, and district heating systems, among others; power-generating facilities and ground-source heat pumps were excluded. Where possible, the current operation status, open and close dates, well data, and other technical data were obtained for each entry. The database contains 545 installations, of which 407 are open, 108 are closed, and 30 have an unknown status. Spas are the most common type of installation, accounting for 50% of installations by number. Aquaculture installations (46 out of 407 open installations) account for the largest percentage (26%) of installed capacity in operation (129 MWth out of 501 MWth). Historical deployment curves show the installed capacity significantly increased in the 1970s and 1980s mainly due to development of geothermal district heating, aquaculture, and greenhouse systems. Since the 2000s, geothermal direct-use development appears to have slowed, and the number of sites in operation decreased due to closures. Case studies reveal multiple barriers to geothermal direct-use implementation and operation, including 1) existence of an information gap among stakeholders, developers, and the general public, 2) competition from cheap natural gas, and 3) the family-owned, small-scale nature of businesses might result in discontinuation among generations.

  8. SOME SPECIFIC FEATURES OF ENERGY CONSUMPTION IN MODERN RESIDENTIAL BUILDINGS

    Directory of Open Access Journals (Sweden)

    S. N. Osipov

    2018-01-01

    Full Text Available Over the past 20 years there have been significant changes in the customer requirements for housing in the countries of the former USSR. Besides, new materials and construction products, such as the ones for sealed windows and balcony doors have appeared in the market. The number of vacant flats with the heating off in the winter significantly increased that may cause condensation on the surfaces of interroom partitions and the formation of mold. Meanwhile, the requirements for lower energy consumption are constantly increasing, that is especially pronouncedly manifested in the growth of normative values of thermal resistance of enclosing structures of buildings and in the increased interest in the use of secondary energy resources extracted from the air and effluent wastewater. The present article describes the method to prevent moisture condensation on the fencing of adjacent premises with different temperatures containing heating systems and the use of waste heat removed from the room exhaust air. For quick emergency switching of in-house systems of heat and gas supply to outdoor mobile sources of heat and gas it is recommended to install special taps with connectors insulated in special niches in the walls or other parts of buildings considering the possibility of placing them close to the outer mobile sources of heat and gas. In the case of heating the building with the aid of a roof gas boiler or by doorto-door heaters fueled by gas, a single pipeline (collector, equipped with an additional device for the connection of emergency gas supply is being put along the wall. In order to reduce specific heat consumption for heating of buildings it is recommended to increase the net enclosure volume of buildings and to improve their form in various ways, including by combining two or more adjacent low-rise buildings in one secondary building with increasing height and with the broadening of either or each side for modernization and reconstruction

  9. The potential for distributed generation in Japanese prototype buildings: A DER-CAM analysis of policy, tariff design, building energy use, and technology development (English Version)

    Energy Technology Data Exchange (ETDEWEB)

    Zhou, Nan; Marnay, Chris; Firestone, Ryan; Gao, Weijun; Nishida, Masaru

    2004-10-15

    The August 2003 blackout of the northeastern U.S. and CANADA caused great economic losses and inconvenience to New York City and other affected areas. The blackout was a warning to the rest of the world that the ability of conventional power systems to meet growing electricity demand is questionable. Failure of large power systems can lead to serious emergencies. Introduction of on-site generation, renewable energy such as solar and wind power and the effective utilization of exhaust heat is needed, to meet the growing energy demands of the residential and commercial sectors. Additional benefit can be achieved by integrating these distributed technologies into distributed energy resource (DER) systems. This work demonstrates a method for choosing and designing economically optimal DER systems. An additional purpose of this research is to establish a database of energy tariffs, DER technology cost and performance characteristics, and building energy consumption for Japan. This research builds on prior DER studies at the Ernest Orlando Lawrence Berkeley National Laboratory (LBNL) and with their associates in the Consortium for Electric Reliability Technology Solutions (CERTS) and operation, including the development of the microgrid concept, and the DER selection optimization program, the Distributed Energy Resources Customer Adoption Model (DER-CAM). DER-CAM is a tool designed to find the optimal combination of installed equipment and an idealized operating schedule to minimize a site's energy bills, given performance and cost data on available DER technologies, utility tariffs, and site electrical and thermal loads over a test period, usually an historic year. Since hourly electric and thermal energy data are rarely available, they are typically developed by building simulation for each of six end use loads used to model the building: electric-only loads, space heating, space cooling, refrigeration, water heating, and natural-gas-only loads. DER-CAM provides a

  10. Radionuclides in produced water from Norwegian oil and gas installations — Concentrations and bioavailability

    Science.gov (United States)

    Eriksen, D. Ø.; Sidhu, R.; Strålberg, E.; Iden, K. I.; Hylland, K.; Ruus, A.; Røyset, O.; Berntssen, M. H. G.; Rye, H.

    2006-01-01

    Substantial amounts of produced water, containing elevated levels of radionuclides (mainly 226Ra and 228Ra) are discharged to the sea as a result of oil and gas production on the Norwegian Continental Shelf. So far no study has assessed the potential radiological effects on marine biota in connection with radionuclide discharges to the North Sea. The main objective of the project is to establish radiological safe discharge limits for radium, lead and polonium associated with other components in produced water from oil and gas installations on the Norwegian continental shelf. This study reports results indicating that the presence of added chemicals such as scale inhibitors in produced water has a marked influence on the formation of radium and barium sulphates when produced water is mixed with sea water. Thus, the mobility and bioavailability of radium (and barium) will be larger than anticipated. Also, the bioavailability of food-borne radium is shown to increase due to presence of such chemicals.

  11. De Minimis Thresholds for Federal Building Metering Appropriateness

    Energy Technology Data Exchange (ETDEWEB)

    Henderson, Jordan W. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-03-31

    The U.S. Department of Energy (DOE) is required by statute and Presidential Memorandum to establish guidelines for agencies to meter their Federal buildings for energy (electricity, natural gas, and steam) and water. See 42 U.S.C. § 8253(e). DOE issued guidance in February 2006 on the installation of electric meters in Federal buildings. A recent update to the 2006 guidance accounts for more current metering practices within the Federal Government. The updated metering guidance specifies that all Federal buildings shall be considered “appropriate” for energy or water metering unless identified for potential exclusion. In developing the updated guidance to carry out the statue, Congress also directed DOE to (among other things) establish exclusions from the metering requirements based on the de minimis quantity of energy use of a Federal building, industrial process, or structure. This paper discusses the method used to identify de minimis values.

  12. Calibration on Pegase of a selective D.R.G. installation for short life and long life fission gas

    International Nuclear Information System (INIS)

    Vasnier, F.

    1968-01-01

    Pegase irradiation loops are equipped with a detection installation which measures the global activity of short-life and long-life fission gases which are released in CO 2 , but the reduced size of circuits in the loop results in an accumulation of long life fission gases, and therefore in problems in the interpretation of measured signals. Thus, the authors propose an additional detection installation which allows long-life fission gases to be separately measured. The principle is to ensure a partial decay of the sampled gas by imposing an additional transit time in order to get rid of short-life fission gases which have a radioactive period of some tenths of a second. A second detector is then used to measure the residual activity of long-life fission gases. The author describes the installation (the normal circuit and the modified circuit), reports the performed tests and the calibration, presents and discusses the obtained results and the installation sensitivity (for short-life and long-life fission gases), and reports their application to the relationship between DRG (sheath failure detection) signals obtained on Pegase and on EDF and EL4 reactors

  13. Rules and regulations on ionizing radiations sources installations

    International Nuclear Information System (INIS)

    1980-01-01

    The finality of this legislative text is to establish the standards and procedures for site, design, building, operation and decommissioning of nuclear installations, radioactive installations and ionizing radiations sources. This text include the commercialization of radioactive substances and equipment fabrication

  14. Statistical analysis of electromagnetic radiation measurements in the vicinity of GSM/UMTS base station installed on buildings in Serbia.

    Science.gov (United States)

    Koprivica, Mladen; Slavkovic, Vladimir; Neskovic, Natasa; Neskovic, Aleksandar

    2016-03-01

    As a result of dense deployment of public mobile base stations, additional electromagnetic (EM) radiation occurs in the modern human environment. At the same time, public concern about the exposure to EM radiation emitted by such sources has increased. In order to determine the level of radio frequency radiation generated by base stations, extensive EM field strength measurements were carried out for 664 base station locations, from which 276 locations refer to the case of base stations with antenna system installed on buildings. Having in mind the large percentage (42 %) of locations with installations on buildings, as well as the inevitable presence of people in their vicinity, a detailed analysis of this location category was performed. Measurement results showed that the maximum recorded value of total electric field strength has exceeded International Commission on Non-Ionizing Radiation Protection general public exposure reference levels at 2.5 % of locations and Serbian national reference levels at 15.6 % of locations. It should be emphasised that the values exceeding the reference levels were observed only outdoor, while in indoor total electric field strength in no case exceeded the defined reference levels. © The Author 2015. Published by Oxford University Press. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  15. 46 CFR 119.430 - Engine exhaust pipe installation.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Engine exhaust pipe installation. 119.430 Section 119... INSTALLATION Specific Machinery Requirements § 119.430 Engine exhaust pipe installation. (a) The design of all... an exhaust pipe. (b) Exhaust gas must not leak from the piping or any connections. The piping must be...

  16. The analysis of energy consumption and greenhouse gas emissions of a large-scale commercial building in Shanghai, China

    Directory of Open Access Journals (Sweden)

    Xin Wang

    2016-02-01

    Full Text Available Reasonable test, diagnosis, and analysis are meaningful for building energy efficiency retrofit and management. Energy consumption and greenhouse gas emission of a large-scale commercial building are described in this article. Basic information about energy consumption equipment is included in the investigation. Further diagnoses about the operational state of air-conditioning water systems, and ducted systems were implemented. Energy consumption decreased 200 kWh/m2 per year from 2007 to 2009 after energy-saving reconstruction in 2006. Next, a carbon audit was carried out; this comprised CO2 emission statistics associated with the energy use and categorization and structural analysis (categorization refers to energy categorization and structural analysis means the composition and its proportion relationship of all kinds of primary energy and secondary energy in energy production or consumption. Greenhouse gas emissions could be less than 150 kg/m2 per year from 2007 to 2009. An analysis of the correlation between CO2 emissions, building gross domestic product, and energy efficiency is also presented. This article makes an analysis on the energy utilization and energy-saving reconstruction of a public commercial building in Shanghai and then makes an analysis of carbon audit about greenhouse gas emissions related to energy utilization (it analyzes the status of building’s energy utilization and greenhouse gas emissions, to have a more comprehensive understanding on the internal relationship between energy consumption and its greenhouse gas emissions and provide researchful reference data for the development with reduction strategies of greenhouse gas emission in future building.

  17. COMPREHENSIVE DIAGNOSTIC AND IMPROVEMENT TOOLS FOR HVAC-SYSTEM INSTALLATIONS IN LIGHT COMMERCIAL BUILDINGS

    Energy Technology Data Exchange (ETDEWEB)

    Abram Conant; Mark Modera; Joe Pira; John Proctor; Mike Gebbie

    2004-10-31

    Proctor Engineering Group, Ltd. (PEG) and Carrier-Aeroseal LLP performed an investigation of opportunities for improving air conditioning and heating system performance in existing light commercial buildings. Comprehensive diagnostic and improvement tools were created to address equipment performance parameters (including airflow, refrigerant charge, and economizer operation), duct-system performance (including duct leakage, zonal flows and thermal-energy delivery), and combustion appliance safety within these buildings. This investigation, sponsored by the National Energy Technology Laboratory, a division of the U.S. Department of Energy, involved collaboration between PEG and Aeroseal in order to refine three technologies previously developed for the residential market: (1) an aerosol-based duct sealing technology that allows the ducts to be sealed remotely (i.e., without removing the ceiling tiles), (2) a computer-driven diagnostic and improvement-tracking tool for residential duct installations, and (3) an integrated diagnosis verification and customer satisfaction system utilizing a combined computer/human expert system for HVAC performance. Prior to this work the aerosol-sealing technology was virtually untested in the light commercial sector--mostly because the savings potential and practicality of this or any other type of duct sealing had not been documented. Based upon the field experiences of PEG and Aeroseal, the overall product was tailored to suit the skill sets of typical HVAC-contractor personnel.

  18. New technological developments in gas processing

    International Nuclear Information System (INIS)

    Draper, R.C.

    1996-01-01

    The changes that the natural gas industry has undergone over the last few years was discussed. Low natural gas prices forced companies to react to their high reserves replacements costs. They were forced to downsize and undergo major restructuring because they were losing money due to high operating costs; the future for natural gas prices looked pessimistic. The changes have led to a new kind of business practice, namely 'partnering with third party processor', mid-stream companies known as aggregators, to build and operate facilities as part of a move towards cost effective improvements for gas producers. Besides reducing capital and operating costs, the producer under this arrangements can dedicate his capital to finding new gas which is the basis of growth. Recent technological changes in the gas processing industry were also touched upon. These included enhanced technologies such as increased liquid hydrocarbon recovery, segregation of C3+ and C5+, installation of gas separation membrane systems, small sulphur plants, acid gas injection and selective or mixed solvents. Details of some of these technologies were described. 2 refs., 2 figs

  19. 78 FR 26354 - Transcontinental Gas Pipeline Company, LLC; Notice of Intent to Prepare an Environmental Impact...

    Science.gov (United States)

    2013-05-06

    ... proposes to: Add an incremental 6,540 horsepower (hp) of compression at its existing Compressor Station 195 in York County, Pennsylvania by: installing a new 35 kilovolt substation, variable frequency drive building, and associated coolers; replacing three existing natural gas- fired reciprocating engines and...

  20. Experimental engineering section off-gas decontamination facility's fractionator column: installation and performance

    International Nuclear Information System (INIS)

    Gilliam, T.M.; Fowler, V.L.; Inman, D.J.

    1978-03-01

    A detailed description of the third column recently installed in the Experimental Engineering Section Off-Gas Decontamination Facility (EES-ODF) is presented. The EES-ODF is being used to provide engineering-scale experiments (nominal gas and liquid flows of 5 scfm and 0.5 gpm, respectively) in the development of the Krypton Absorption in Liquid CO 2 (KALC) process. A detailed discussion of the column's construction is provided. This discussion includes the peripherals associated with the column, such as refrigeration, heat exchangers, instrumentation, etc. The compressibility of Goodloe packing (the packing in the other columns) and the possible reduced throughput due to this compression have revealed the desirablility of a random (i.e., noncompressible) packing. Toward this end, the third column is packed with a new random packing (PRO-PAK). A preliminary comparison between this packing and the woven wire mesh packing (Goodloe) used in the other two columns has been made. Experiments comparing the throughput capacity indicate that the PRO-PAK packing has approximately 60% the capacity of Goodloe for a CO 2 system. When used as a fractionator or stripper with the basic O 2 -Kr-CO 2 KALC system, the PRO-PAK column produced HTU values less than or equal to the GOODLOE columns under similar operating conditions

  1. Solar heating and hot water system installed at office building, One Solar Place, Dallas, Texas. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1980-06-01

    This document is the Final Report of the Solar Energy System Installed at the First Solar Heated Office Building, One Solar Place, Dallas, Texas. The Solar System was designed to provide 87 percent of the space heating needs, 100 percent of the potable hot water needs and is sized for future absorption cooling. The collection subsystem consists of 28 Solargenics, series 76, flat plate collectors with a total area of 1596 square feet. The solar loop circulates an ethylene glycol-water solution through the collectors into a hot water system heat exchanger. The hot water storage subsystem consists of a heat exchanger, two 2300 gallon concrete hot water storage tanks with built in heat exchangers and a back-up electric boiler. The domestic hot water subsystem sends hot water to the 10,200 square feet floor area office building hot water fixtures. The building cold water system provides make-up to the solar loop, the heating loop, and the hot water concrete storage tanks. The design, construction, cost analysis, operation and maintenance of the solar system are described. The system became operational July 11, 1979.

  2. Method for the combustion of a gas, in fixed bed, with an oxidized solid and associated installation

    OpenAIRE

    Abanades García, Juan Carlos; Fernández García, José Ramón

    2014-01-01

    [EN] The present invention pertains to the field of the generation of energy from combustible gases, incorporating the capture of carbon dioxide for use or permanent storage and, specifically relates to cyclical methods of gas combustion with oxidized solids (chemical looping processes), in fixed bed, for solving the problem of controlling temperature in the combustion of gaseous fuels in fixed beds of metal oxides operating at high pressures, and also the associated installation.

  3. Installation of a freezer building : a logical, innovative and profitable decision; Installation d'un batiment congelateur : une decision logique, innovatrice et rentable

    Energy Technology Data Exchange (ETDEWEB)

    Vaillancourt, G. [Nutrifrance Ltd. Saint-Jean-Sur-Richelieu, PQ (Canada)

    2009-12-15

    This article reported on a food company in Saint-Jean-sur-Richelieu, Quebec that has recently modernized its operations by constructing an entire freezer building. Nutrifrance Ltd made the decision to modernize its facility based on long-term energy savings. Three scenarios were analysed for the construction of the freezer building in terms of interior and exterior walls, panels and shelving. The final plans consisted of a freezer within the building, where the outer walls were used as the structure to insulate against heat loss. A heated attic was built to avoid condensation on top of the freezer. Forced air ventilation with a header space was also integrated. The floor consists of 18 centimetres of reinforced concrete every 13 centimetres, giving a thermal resistance of R40. A rapid defrosting process through hot gas is used to recuperate 100 per cent of the heat. Waste heat is used to heat the floors of the office building, the loading areas, and to warm the hot water. The system is controlled by automated machinery to maximize efficiency and costs. The construction offers optimal thermal comfort for employees, which has helped reduce employee turnover. The economical impact has been significant, even after one year of operation, and the energy savings for the electricity bill is 30 per cent lower than predicted. Nutrifrance chose not to use the lowest bid for construction since the ultimate goal was comfort and security. The company predicts a payback period of 14 years. 5 figs.

  4. Heat recovery from flue gas of coal fired installations with reduced pollutant emission - the Zittau process

    Energy Technology Data Exchange (ETDEWEB)

    Mueller, H; Strauss, R; Hofmann, K -D; Suder, M; Hultsch, T; Wetzel, W; Gabrysch, H; Jung, J [Technische Hochschule, Zittau (German Democratic Republic)

    1989-01-01

    Explains the Zittau technology of combined flue gas heat recovery and flue gas desulfurization in small brown coal fired power plants. Steam generators to be equipped with this technology have 6.5 or 10 t/h steam capacity and are intended for combustion of low-grade brown coal (8.2 MJ/kg). An industrial 6.5 t/h prototype steam generator is in operation and it achieves 95% SO{sub 2} removal from flue gas with 5600 to 7800 mg SO{sub 2} per m{sup 3} of dry flue gas. The Zittau technology is available in 3 variants: with maximum waste heat recovery, with partial waste heat recovery or without waste heat recovery and only wet flue gas scrubbing. Two flowsheets of flue gas and suspension circulation are provided. The first variant recovers 25.7% of nominal heat capacity (1.1 thermal MW from a 4.2 MW steam generator with 6.5 t/h steam capacity), which amounts to economizing 2,400 t/a brown coal equivalent over 4,000 annual operating hours. The second variant recovers 6.5% of waste heat, requiring less investment by installing smaller heat exchangers than used in the first variant. All three variants have contact spray separators, suction units and suspension preparation equipment. Flue gas suspension scrubbing is carried out with fly ash produced by the steam generator. This ash is capable of absorbing 50 to 70% of flue gas SO{sub 2}. Supply of additional ash from other plants achieve a further 25% SO{sub 2} removal; a higher desulfurization degree is obtained by adding limestone to suspensions. 5 refs.

  5. Installation design of pump motor control systems for supplied of the RSG-GAS secondary raw water cooling system

    International Nuclear Information System (INIS)

    Kiswanto; Teguh Sulistyo; M-Taufik

    2013-01-01

    It has designed already of an installation of the pump motor control system for supplied of raw water to fulfil the RSG-GAS secondary cooling system. The installation design of this plant is used to supply electrical energy from PLN and 3 phase generator to operate the pump motor embedded multilevel type, capacity, Q = 30 m 3 /h; electric power, PN = 4 kW; voltage, 380V/3-/50Hz, and Y connections that can be operated manually or automatically by using the automatic transfer switch. The results obtained recapitulation total load of 4 kW, the magnitude of the nominal current of 9.5 A; kind of safety and capacity are used NFB 16 A, use of this type of cable to the control panel is PLN NYY 6 mm 2 diameter maximum current capacity of 25 A cable and use the control panel to the pump motor cable type NYY 4 mm 2 diameter maximum current capacity of 20 A. The design of the pump motor control system installation is ready to be implemented. (author)

  6. Flue gas heat recovery operating below the dew point and its utilisation for low temperature heating installations

    Energy Technology Data Exchange (ETDEWEB)

    Wilsdorf, J.

    1986-11-01

    This paper deals at first with the characteristics of two principal systems for the flue gas heat recovery by reducing the temperature below the dew point. With test results on experimental plants are shown the typical differences between surface and direct contact heat exchange. A second part informs about experiences from the application for low temperature heating installations, especially about thermodynamics condensate quality and technical design. The possible increasing of the efficiency ranges between 10 to 20 per cent.

  7. Development of an installation for the production of high-purity hydrogen using the pressure-swing-adsorption process with coke-oven gas as feedstock

    Energy Technology Data Exchange (ETDEWEB)

    Nakamura, M; Sugishita, M

    1986-04-01

    This paper describes how Nippon Steel developed a process for producing high-purity hydrogen using the PSA method with coke-oven gas as a feedstock. The process comprises a gas-compression and gas-cooling stage, a pre-treatment stage, an adsorption stage, a de-oxygenation stage and various control and maintenance devices, etc. The triple-tower plant constructed is the equivalent of a four-tower conventional installation, with a maximum capacity of around 10,000 Nm/sup 3//h. 1 tab., 14 figs., 3 refs.

  8. Completed installations and the individual commissioning of the KSTAR MG system

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Chang-Hwan, E-mail: kch2004@nfri.re.kr [National Fusion Research Institute, 169-148 Gwahangno, Yusung-gu, Daejeon 305-333 (Korea, Republic of); Eom, Dae-young; Lee, Woo-Jin; Kong, Jong-Dea; Joung, Nam-Young; Kim, Yang-Soo; Kwon, Myeun [National Fusion Research Institute, 169-148 Gwahangno, Yusung-gu, Daejeon 305-333 (Korea, Republic of); Jang, Eun; Han, Chul-Woo; Lee, Sel-Ki; Kim, Gwang-Seon; Maeng, Jae-Hoon [Vitzrotech Co., Ltd, 605-2 Seonggok-dong, Danwon-gu, Ansan, Gyeonggi-do 425-833 (Korea, Republic of)

    2014-04-15

    Highlights: • All components of the MG system were made from each professional supplier and installed completely in the NFRI site. • The building and the overhead crane which need to install the MG system, were built in two sections. One is for the bearing, rotor and stator and the other section is for the VVVF and excitation system. • The dummy coil testing will commence in July 2013 and the comprehensive performance test of MG will be tested from August when the MPS commissioning is processing with superconducting coil. - Abstract: Peak power of 200 MVA is required in order to achieve the goal within a long pulse scenario for the final operation of the Korean Superconducting Tokamak Advanced Research (KSTAR). The available grid power is only 100 MVA at the National Fusion Research Institute (NFRI) site. Motor generator (MG) was considered as a method of resolving such problems. The design of the KSTAR MG system was completed in July 2010 and individual devices were produced by relevant manufacturers. The installation of individual devices was completed in December 2012. Specifically, the stator and rotor were assembled at the site due to their large size and weight. The bearings, variable voltage variable frequency (VVVF) and excitation systems were transported and installed on site after being manufactured externally. The building used for MG installation was built in 2011. With the building designed for ease of installation, an overhead crane was designed to allow access to the loading bay. In this paper, we discuss the installation of the MG system and the construction of the building suitable for installation of individual devices. In addition, performance on the test results of individual devices is also discussed.

  9. Interotex-innovative gas equipment for heating and cooling

    Energy Technology Data Exchange (ETDEWEB)

    Winnington, T.L. [Interotex Ltd. (United Kingdom); Moore, N. [British Gas plc (United Kingdom); Valle, F.; Sanz, J. I. [Gas Natural SDG S.A. (Spain); Chavarri, J.M. [Fagor Electrodomesticos S. Coop. (Spain); Uselton, R. [Lennox Industries Inc. (United States)

    1997-10-01

    Conventionally, cooling technology for the residential market is provided by electrically driven vapour re-compression systems. But lately, due to the Montreal Protocol - restricting the utilisation of ozone depleting substances - and to the high peak demand in electricity, created by electrical air conditioning systems, there is a commercial opportunity for gas fired air conditioning appliances. This paper describes the development programme for a radical new absorption technology, from the theoretical studies, through the experimental programme, to the building, commissioning and installation of demonstration machines. It also includes an analysis of the world-wide residential cooling market and the opportunities available to manufacturers and gas utilities to introduce new gas heating and cooling technology, capable of competing effectively with electrical systems. (au)

  10. Design/installation and structural integrity assessment under the Federal Facility Agreement for Bethel Valley Low-Level Waste Collection and Transfer System upgrade for Building 2026 (High Radiation Level Analytical Laboratory) and Building 2099 (Monitoring and Control Station) at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    1994-10-01

    This document presents a Design/Installation and Structural Integrity Assessment for a replacement tank system for portions of the Bethel Valley Low Level Waste (LLW) System, located at the Oak Ridge Reservation, Oak Ridge, Tennessee. This issue of the assessment covers the design aspects of the replacement tank system, and certifies that the design has sufficient structural integrity and is acceptable for the storing or treating of hazardous and/or radioactive substances. The present issue identifies specific activities that must be completed during the fabrication, installation, and testing of the replacement tank system in order to provide assurance that the final installation complies with governing requirements. Portions of the LLW system are several decades old, or older, and do not comply with current environmental protection regulations. Several subsystems of the LLW system have been designated to receive a state-of-the-art replacement and refurbishment. One such subsystem serves Building 2026, the High Radiation Level Analytical Laboratory. This assessment focuses on the scope of work for the Building 2026 replacement LLW Collection and Transfer System, including the provision of a new Monitoring and Control Station (Building 2099) to receive, store, and treat (adjust pH) low level radioactive waste

  11. Impact of future urban form on the potential to reduce greenhouse gas emissions from residential, commercial and public buildings in Utsunomiya, Japan

    International Nuclear Information System (INIS)

    Ishii, Satoshi; Tabushi, Shoichi; Aramaki, Toshiya; Hanaki, Keisuke

    2010-01-01

    Energy-saving technologies' applicability to making cities more environmentally sustainable can be strongly influenced by the city's form, building uses and their density pattern. Technological developments have clearly shown specific urban forms to be more conducive to installing certain mitigation technologies. In this study, the capacity for implementation and impacts on energy savings and subsequent greenhouse gas (GHG) reduction potential of mitigation technologies such as photovoltaic cells (PV) and combined heat and power (CHP) technologies were analysed with respect to three potential urban forms (high density centralised, medium density averaged and low density de-centralized) for Utsunomiya City, Japan. Given current building use patterns, scenarios for 2030 and 2050, showed the medium density averaged form, which benefits from both PV and CHP technologies, to outperform the other forms, resulting in an energy savings and GHG reduction potential of 27.6% in 2030 and 67.6% in 2050. Interestingly, GHG reduction in 2050 was primarily attributable to PV, while CHP technology had the greater influence in 2030. Despite the limitation of the analysis, the study provides a useful insight, highlighting the relationship between urban forms and GHG reduction potential by two energy-saving technologies.

  12. Providing for energy efficiency in homes and small buildings. Part III. Determining which practices are most effective and installing materials

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-06-01

    The training program is designed to educate students and individuals in the importance of conserving energy and to provide for developing skills needed in the application of energy-saving techniques that result in energy-efficient buildings. A teacher guide and student workbook are available to supplement the basic manual. Subjects covered in Part III are: determining which practices are most efficient and economical; installing energy-saving materials; and improving efficiency of equipment.

  13. Monitoring the performance of single and triple junction amorphous silicon modules in two building integrated photovoltaic (BIPV) installations

    International Nuclear Information System (INIS)

    Eke, Rustu; Senturk, Ali

    2013-01-01

    Highlights: • The first and the largest BIPV of Turkey were installed. • Single and triple junction amorphous module performances in BIPV applications are analyzed. • Total generated electricity of the BIPV system is measured as 103,702 kW h for 36 months of operation. • Annual energy rating is calculated as 856 kW h/kWp for a non-optimally oriented plant. • The PR of the system is found 0.74 and 0.81 for PV systems on towers and facade respectively. - Abstract: Mugla is located in south west Turkey at 37°13′N latitude and 28°36′E longitude with yearly sum of horizontal global irradiation exceeding 1700 kW h per square meter. Mugla has a Mediterranean Climate which is characterized by long, hot and dry summers with cool and wet winters. Mugla Sıtkı Kocman University is the largest “PV Park” in Turkey consisting of 100 kWp installed Photovoltaic Power Systems (PVPSs) with different PV applications. The 40 kWp building integrated photovoltaic (BIPV) system which is the first and largest in Turkey was installed on the façade and the two towers of the “Staff Block of the Education Faculty’s Building” of Mugla Sıtkı Kocman University in February 2008. Triple junction amorphous silicon photovoltaic modules are used on the façade and single junction amorphous silicon PV modules are used on the East and West towers of the building. In this paper, the 40 kWp BIPV system in Mugla, Turkey is presented, and its performance is evaluated. Energy rating (kW h/kWp energy yield), efficiencies and performance ratios of both applications are also evaluated for 36 months of operation. Daily, monthly and seasonal variations in performance parameters of the BIPV system in relation to solar data and meteorological parameters and outdoor performance of two reference modules (representing the modules on façade and towers) in a summer and a winter day are also investigated

  14. Physical installation of Pelletron and electron cooling system

    International Nuclear Information System (INIS)

    Hurh, P.

    1997-01-01

    Bremsstrahlung of 5 MeV electrons at a loss current of 50 microamp in the acceleration region is estimated to produce X-ray intensities of 7 Rad/sec. Radiation losses due to a misteer or sudden obstruction will of course be much higher still (estimated at 87,500 Rad/hr for a 0.5 mA beam current). It is estimated that 1.8 meters of concrete will be necessary to adequately shield the surrounding building areas at any possible Pelletron installation site. To satisfy our present electron cooling development plan, two Pelletron installations are required, the first at our development lab in the Lab B/NEF Enclosure area and the second at the operational Main Injector service building, MI-30, in the main Injector ring. The same actual Pelletron and electron beam-line components will be used at both locations. The Lab B installation will allow experimentation with actual high energy electron beam to develop the optics necessary for the cooling straight while Main Injector/Recycler commissioning is taking place. The MI-30 installation is obviously the permanent home for the Pelletron when electron cooling becomes operational. Construction plans for both installations will be discussed here

  15. Preliminary project of installation for separation tubes tests-ITTS

    International Nuclear Information System (INIS)

    Rocha, Z.

    1984-01-01

    A consolidation of actual ideas about installation, entitled ''Installation to separation tubes tests-ITTS'', expected to CDTN is presented. The project bases, the testing to be realized, the procedures to be obeyed during the operation, the components and the space required by installation and auxiliary equipments, the presumable origin of components (nacional and international), including a preliminary list of building and operation costs are described. (author) [pt

  16. A multi-objective optimization model for energy-efficiency building envelope retrofitting plan with rooftop PV system installation and maintenance

    International Nuclear Information System (INIS)

    Fan, Yuling; Xia, Xiaohua

    2017-01-01

    Highlights: • A multi-objective optimization model for building envelope retrofit is presented. • Facility performance degradation and maintenance is built into the model. • A rooftop PV system is introduced to produce electricity. • Economic factors including net present value and payback period are considered. - Abstract: Retrofitting existing buildings with energy-efficient facilities is an effective method to improve their energy efficiency, especially for old buildings. A multi-objective optimization model for building envelope retrofitting is presented. Envelope components including windows, external walls and roofs are considered to be retrofitted. Installation of a rooftop solar panel system is also taken into consideration in this study. Rooftop solar panels are modeled with their degradation and a maintenance scheme is studied for sustainability of energy and its long-term effect on the retrofitting plan. The purpose is to make the best use of financial investment to maximize energy savings and economic benefits. In particular, net present value, the payback period and energy savings are taken as the main performance indicators of the retrofitting plan. The multi-objective optimization problem is formulated as a non-linear integer programming problem and solved by a weighted sum method. Results of applying the designed retrofitting plan to a 50-year-old building consisting of 66 apartments demonstrated the effectiveness of the proposed model.

  17. Natural gas in low energy house Zittau

    International Nuclear Information System (INIS)

    Maertens, L.; Koschack, A.

    1999-01-01

    This paper describes a low-energy house in Zittau, Germany. The house consists of two parts A and B. Part A is heated by means of gas boilers and condensed boilers, while part B is solar heated. Energy for heating and warming of tap water is an important part of the primary energy consumption in Germany. Therefore, one way of reducing the CO2 emissions is to reduce the heat losses of buildings through outer facades and air ventilation, to use regenerative energy sources, to use fuels with low CO2 emissivity like natural gas, and to install efficient heating- and hot water preparation systems. The low-energy house in Zittau is used for energy research

  18. Small wind planning and building successful installations

    CERN Document Server

    Clark, Nolan

    2013-01-01

    This book provides a cohesive guide to achieving successful small wind installations. It is a comprehensive information resource from one of the world's most experienced small wind professionals, covering all the key issues for small wind system development, from site and machine selection to international standards compliance. Engineers who are tasked with planning and developing these small wind systems, from choosing the best site and accurately estimating likely power output to obtaining proper permitting and troubleshooting operational inefficiencies, will find this book an ess

  19. Solar system installation at Louisville, Kentucky

    Science.gov (United States)

    1978-01-01

    The installation of a solar space heating and domestic hot water system is described. The overall philosophy used was to install both a liquid and a hot air system retrofitted to existing office and combined warehouse building. The 1080 sq. ft. office space is heated first and excess heat is dumped into the warehouse. The two systems offer a unique opportunity to measure the performance and compare results of both air and liquid at one site.

  20. Designing Software-Based Interactive Installations

    DEFF Research Database (Denmark)

    Andreasen, Troels; Juul, Niels Christian; Rosendahl, Mads

    2014-01-01

    of the installation using tools like sketching or storyboarding. The design involves a clarification of available and appropriate building blocks, as well as the linking of these blocks to provide an architectural framework comprising the intended external behavior. The construction phase takes a component...

  1. MDSplus automated build and distribution system

    Energy Technology Data Exchange (ETDEWEB)

    Fredian, T., E-mail: twf@psfc.mit.edu [Massachusetts Institute of Technology, 175 Albany Street, Cambridge, MA 02139 (United States); Stillerman, J. [Massachusetts Institute of Technology, 175 Albany Street, Cambridge, MA 02139 (United States); Manduchi, G. [Consorzio RFX, Euratom-ENEA Association, Corso Stati Uniti 4, Padova 35127 (Italy)

    2014-05-15

    Support of the MDSplus data handling system has been enhanced by the addition of an automated build system which does nightly builds of MDSplus for many computer platforms producing software packages which can now be downloaded using a web browser or via package repositories suitable for automatic updating. The build system was implemented using an extensible continuous integration server product called Hudson which schedules software builds on a collection of VMware based virtual machines. New releases are created based on updates via the MDSplus cvs code repository and versioning are managed using cvs tags and branches. Currently stable, beta and alpha releases of MDSplus are maintained for eleven different platforms including Windows, MacOSX, RedHat Enterprise Linux, Fedora, Ubuntu and Solaris. For some of these platforms, MDSplus packaging has been broken into functional modules so users can pick and choose which MDSplus features they want to install. An added feature to the latest Linux based platforms is the use of package dependencies. When installing MDSplus from the package repositories, any additional required packages used by MDSplus will be installed automatically greatly simplifying the installation of MDSplus. This paper will describe the MDSplus package automated build and distribution system.

  2. MDSplus automated build and distribution system

    International Nuclear Information System (INIS)

    Fredian, T.; Stillerman, J.; Manduchi, G.

    2014-01-01

    Support of the MDSplus data handling system has been enhanced by the addition of an automated build system which does nightly builds of MDSplus for many computer platforms producing software packages which can now be downloaded using a web browser or via package repositories suitable for automatic updating. The build system was implemented using an extensible continuous integration server product called Hudson which schedules software builds on a collection of VMware based virtual machines. New releases are created based on updates via the MDSplus cvs code repository and versioning are managed using cvs tags and branches. Currently stable, beta and alpha releases of MDSplus are maintained for eleven different platforms including Windows, MacOSX, RedHat Enterprise Linux, Fedora, Ubuntu and Solaris. For some of these platforms, MDSplus packaging has been broken into functional modules so users can pick and choose which MDSplus features they want to install. An added feature to the latest Linux based platforms is the use of package dependencies. When installing MDSplus from the package repositories, any additional required packages used by MDSplus will be installed automatically greatly simplifying the installation of MDSplus. This paper will describe the MDSplus package automated build and distribution system

  3. Investigation on Prefabricated Building System Skilled Component Installers

    OpenAIRE

    Nurul Rezuana Buyung; Md Azree Othuman Mydin; Abdul Naser Abdul Ghani

    2013-01-01

    In the face of an increasingly challenging era of globalization, skills and new equipments which includes prefabricated building components, known as Industrialized Building System (IBS) has been introduced towards achievement of sustainable construction. IBS is a construction system in which the components are manufactured in a factory, on or off site, positioned and assembled into complete structures with minimal additional site work. IBS requires high construction precisi...

  4. Last End Cap Toroid installation : The Pharaonic enterprise

    CERN Multimedia

    Arnaud Foussat

    After the successful and impressive transport feat from Building 191 to Point 1 was carried out by the Friderici crew on 28th June, the second and last Toroid End Cap, ECT-C, was transferred into the surface building, SX1, on 2nd July. The ECT-C was installed in the ATLAS cavern on the C-side on 12th July. As the person responsible for the project, in my opinion, one of the crucial points of this project was to design all the tooling and installation sequences taking into account the building infrastructure dimensional constraints. View of the ECT installation tooling and preparation for the ECT-C descent into the ATLAS 80m-shaft by the ATLAS magnet group and DBS teams. The movement of the 240-ton magnet and 12-m diameter toroid end-cap was achieved in collaboration with SCALES, a subcontractor company, using a hydraulic gantry able to lower the ECT inside the shaft by 5m below the floor level . This allowed the DBS team to attach the end-cap with the 2 x 140 tons overhead crane and lower it onto the c...

  5. Installation package - home solar heater

    Science.gov (United States)

    1980-01-01

    Installation of commerical solar-heating system at two story, three bedroom house in New Hampshire is described in 65 page report. System collectors are integrated part of building replacing conventional roofing or siding. Report also includes general description of system, its operation and guidelines, orientation and references.

  6. Using Solar Hot Water to Address Piping Heat Losses in Multifamily Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Springer, David [Alliance for Residential Building Innovation, Davis, CA (United States); Seitzler, Matt [Alliance for Residential Building Innovation, Davis, CA (United States); Backman, Christine [Alliance for Residential Building Innovation, Davis, CA (United States); Weitzel, Elizabeth [Alliance for Residential Building Innovation, Davis, CA (United States)

    2015-10-01

    Solar thermal water heating is most cost effective when applied to multifamily buildings and some states offer incentives or other inducements to install them. However, typical solar water heating designs do not allow the solar generated heat to be applied to recirculation losses, only to reduce the amount of gas or electric energy needed for hot water that is delivered to the fixtures. For good reasons, hot water that is recirculated through the building is returned to the water heater, not to the solar storage tank. The project described in this report investigated the effectiveness of using automatic valves to divert water that is normally returned through the recirculation piping to the gas or electric water heater instead to the solar storage tank. The valves can be controlled so that the flow is only diverted when the returning water is cooler than the water in the solar storage tank.

  7. High temperature gas cleaning for pressurized gasification. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Alden, H.; Hagstroem, P.; Hallgren, A.; Waldheim, L. [TPS Termiska Processer AB, Nykoeping (Sweden)

    2000-04-01

    The purpose of the project was to build an apparatus to study pressurized, high temperature gas cleaning of raw gasification gas generated from biomass. A flexible and easy to operate pressurized apparatus was designed and installed for the investigations in high temperature gas cleaning by means of thermal, catalytic or chemical procedures. A semi continuos fuel feeding concept, at a maximum rate of 700 g/h, allowed a very constant formation of a gas product at 700 deg C. The gas product was subsequently introduced into a fixed bed secondary reactor where the actual gas cleanup or reformation was fulfilled. The installation work was divided into four work periods and apart from a few delays the work was carried out according to the time plan. During the first work period (January - June 1994) the technical design, drawings etc. of the reactor and additional parts were completed. All material for the construction was ordered and the installation work was started. The second work period (July - December 1994) was dedicated to the construction and the installation of the different components. Initial tests with the electrical heating elements, control system and gas supply were assigned to the third work period (January - June 1995). After the commissioning and the resulting modifications, initial pyrolysis and tar decomposition experiments were performed. During the fourth and final work period, (June - December 1995) encouraging results from first tests allowed the experimental part of the project work to commence, however in a slightly reduced program. The experimental part of the project work comparatively studied tar decomposition as a function of the process conditions as well as of the choice of catalyst. Two different catalysts, dolomite and a commercial Ni-based catalyst, were evaluated in the unit. Their tar cracking ability in the pressure interval 1 - 20 bar and at cracker bed temperatures between 800 - 900 deg C was compared. Long term tests to study

  8. 49 CFR 192.359 - Customer meter installations: Operating pressure.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Customer meter installations: Operating pressure... SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Customer Meters, Service Regulators, and Service Lines § 192.359 Customer meter installations: Operating pressure...

  9. Using of gas for water heating at buildings - study on technical and economical viability; Utilizacao de gas para aquecimento de agua em instalacoes prediais - estudo de viabilidade tecnica e economica

    Energy Technology Data Exchange (ETDEWEB)

    Fossa, Alberto Jose [MDJ Assessoria e Engenharia Consultiva, Santo Amaro, SP (Brazil)]. E-mail: afossa@mdj.com.br; Chaguri, Jose Jorge [Caltherm Sistemas de Aquecimento, Sao Paulo, SP (Brazil)]. E-mail: jchaguri@caltherm.com.br; Santos, Edmilson Moutinho dos [Universidade de Sao Paulo (USP), SP (Brazil). Inst. de Eletrotecnica e Energia]. E-mail: edsantos@iee.usp.br

    2006-07-01

    The recent discovery of significant Brazilian's natural gas reserves has been opened a discussion concerning public procedures in order to incentive development of gas industry thru delivery of this energetic to the end consumer. Concerning this figure, a significant quantity of uses has been questioned related economical viability. This paper comes to analyze the possibility to change electrical energy for natural gas on heating water systems used on residential installations. Concerns about economical impact of alternative adopted on locals where public regulations are been established to incentive natural gas end uses. (author)

  10. 46 CFR 182.430 - Engine exhaust pipe installation.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Engine exhaust pipe installation. 182.430 Section 182... 100 GROSS TONS) MACHINERY INSTALLATION Specific Machinery Requirements § 182.430 Engine exhaust pipe... equipment might come in contact with an exhaust pipe. (b) Exhaust gas must not leak from the piping or any...

  11. Photovoltaics for professionals solar electric systems marketing, design and installation

    CERN Document Server

    Falk, Antony; Remmers, Karl-Heinz

    2007-01-01

    For the building industry, the installation of photovoltaic systems has become a new field of activity. Interest in solar energy is growing and future business prospects are excellent. Photovoltaics for Professionals describes the practicalities of marketing, designing and installing photovoltaic systems, both grid-tied and stand-alone. It has been written for electricians, technicians, builders, architects and building engineers who want to get involved in this expanding industry. It answers all the beginner's questions as well as serving as a textbook and work of reference

  12. Building America Case Study: Assessment of a Hybrid Retrofit Gas Water Heater

    Energy Technology Data Exchange (ETDEWEB)

    2017-06-19

    This project completed a modeling evaluation of a hybrid gas water heater that combines a reduced capacity tankless unit with a downsized storage tank. This product would meet a significant market need by providing a higher efficiency gas water heater solution for retrofit applications while maintaining compatibility with the half-inch gas lines and standard B vents found in most homes. The TRNSYS simulation tool was used to model a base case 0.60 EF atmospheric gas storage water, a 0.82 EF non-condensing gas tankless water heater, an existing (high capacity) hybrid unit on the market, and an alternative hybrid unit with lower storage volume and reduced gas input requirements. Simulations were completed under a 'peak day' sizing scenario with 183 gpd hot water loads in a Minnesota winter climate case. Full-year simulations were then completed in three climates (ranging from Phoenix to Minneapolis) for three hot water load scenarios (36, 57, and 96 gpd). Model projections indicate that the alternative hybrid offers an average 4.5% efficiency improvement relative to the 0.60 EF gas storage unit across all scenarios modeled. The alternative hybrid water heater evaluated does show promise, but the current low cost of natural gas across much of the country and the relatively small incremental efficiency improvement poses challenges in initially building a market demand for the product.

  13. 49 CFR 192.357 - Customer meters and regulators: Installation.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Customer meters and regulators: Installation. 192... SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Customer Meters, Service Regulators, and Service Lines § 192.357 Customer meters and regulators: Installation. (a...

  14. Low-Cost Gas Heat Pump for Building Space Heating

    Energy Technology Data Exchange (ETDEWEB)

    Garrabrant, Michael [Stone Mountain Technologies, Inc., Johnson City, TN (United States); Keinath, Christopher [Stone Mountain Technologies, Inc., Johnson City, TN (United States)

    2016-10-11

    , which will allow for improved load matching. In addition, the energy savings analysis showed that a house in Albany, NY, Chicago, IL and Minneapolis, MN would save roughly 32, 28.5 and 36.5 MBtu annually when compared to a 100% efficient boiler, respectively. The gas absorption heat pump achieves this performance by using high grade heat from the combustion of natural gas in combination with low grade heat extracted from the ambient to produce medium grade heat suitable for space and water heating. Expected product features include conventional outdoor installation practices, 4:1 modulation, and reasonable economic payback. These factors position the technology to gain significant market penetration, resulting in a large reduction of energy use and greenhouse gas emissions for residential space heating.

  15. Experience with building integrated solar collectors; Erfaring med bygningsintegrerte solfangere

    Energy Technology Data Exchange (ETDEWEB)

    Simonsen, Ingeborg; Time, Berit; Andresen, Inger

    2011-07-01

    The main objective of the research 'Zero Emission Buildings' ZEB is to develop products and solutions that provide buildings with zero greenhouse gas emissions associated with the production, operation and disposal. Can we make this happen must the building produce more energy than it needs to compensate for greenhouse gas emissions from the production of materials and the actual construction.To build up knowledge on experience with building integrated solar collectors in Norway, we have in this study made interviews with suppliers and manufacturers of solar collectors and some building owners. Since the focus is on climate shell, we have limited the study to include solar collectors to replace a part of the cladding or roofing. Construction upstairs roofing, outside facade or freestanding rack is not considered as building integrated in this context. The providers we have been in contact with appeals to slightly different parts of the market. This is reflected in the product's development, assembly and approach to the calculation of energy delivery. Overall, providers may offer a range of products suitable for both the professional and skilled carpenter, the interested 'man in the street' . The feedback we have received shows generally good experiences with the product and the installation. Because of the preliminary short operating periods of the investigated plants we have little data on energy supply from these plants. In summary, we can say that the knowledge and the products are available and it is up to use to use them.(Author)

  16. NEMP effects on domestic installation

    International Nuclear Information System (INIS)

    Braun, C.; Clemens, P.; Graf, W.; Guidi, P.; Schmidt, H.U.

    1985-01-01

    The measurements have been made in a building of a psychiatric clinic at Alzey/West Germany. The building has been chosen for the measuring campaign because it has its own electrical installation for mains current supply and emergency power supply, apart from systems of the other buildings. The two supply systems DONNERSBERG could be cut off completely from the other mains systems, so that coupling and feed experiments could be made without mains voltage. Current supply to the measuring systems was done by means of extension cables, or by batteries. The wiring for connection to the room circuits is parallel to the exterior wall, so that measurements could be done by using a frame antenna placed outside of the building parallel to the exterior wall. (orig./DG) [de

  17. Build up of Radioactive Krypton and Xenon Analysis System

    International Nuclear Information System (INIS)

    Lee, D. K.; Choi, C. S.; Chung, K. H.; Lee, W.; Cho, Y. H.; Lee, C. W.

    2008-03-01

    The objective of this project is to build up an analysis system to measure the activity of the atmospheric radioactive krypton and xenon in Korea. The work scopes of the project include the purchase and the installation of the analysis system to measure the activity of the radioactive krypton and xenon in air, and the establishment of the operation capability of the system through the training of the operator. The system consists of two air sampling systems, and one radioactivity analysis system, which incorporates the enrichment system, the gas chromatography to purify a mixture gas, and the gas proportional counter to count the activity of pure krypton and xenon gas. As planned originally, the establishment of the analysis system has been completed. At present, one air sampler is successfully being operated at a specific site of the South Korea to measure the background radioactivities of Kr-85 and Xe-133 in air. The other air sampler is being reserved at the KAERI in the Daejeon for a emergency like the second nuclear test of the North Korea. During the normal time, the reserved air sampler will be used to collect the air sample for the performance test of the analysis system and the cross analysis for the calibration of the system. The radioactivity analysis system has been installed at the KAERI, and is being used to measure the activity of Kr-85 and Xe-133 in the air sample from a domestic site

  18. Investigating and analysing the energy and environmental performance of an experimental green roof system installed in a nursery school building in Athens, Greece

    Energy Technology Data Exchange (ETDEWEB)

    Santamouris, M.; Pavlou, C.; Doukas, P.; Synnefa, A.; Hatzibiros, A. [University of Athens, (Greece). Department of Physics, Division of Applied Physics, Laboratory of Meteorology; Mihalakakou, G. [University of Ioannina, Agrinion (Greece). Department of Environment and Natural Resources Management; Patargias, P. [University of Peloponnesus, Kalamata (Greece). Faculty of Human Sciences and Cultural Studies, Department of History, Archaeology and Cultural Heritage Management

    2007-09-15

    This paper deals with the experimental investigation and analysis of the energy and environmental performance of a green roof system installed in a nursery school building in Athens. The investigation was implemented in two phases. During the first phase, an experimental investigation of the green roof system efficiency was presented and analysed, while in the second one the energy savings was examined through a mathematical approach by calculating both the cooling and heating load for the summer and winter period for the whole building as well as for its top floor. The energy performance evaluation showed a significant reduction of the building's cooling load during summer. This reduction varied for the whole building in the range of 6-49% and for its last floor in the range of 12-87%. Moreover, the influence of the green roof system in the building's heating load was found insignificant, and this can be regarded a great advantage of the system as any interference in the building shell for the reduction of cooling load leads usually to the increase of its heating load. (author)

  19. Natural gas, the comfort stamina; Le gaz nerf du confort

    Energy Technology Data Exchange (ETDEWEB)

    Le Bail, L. [Gaz de France (GDF), 75 - Paris (France)

    1997-09-01

    According to consumers and thermal engineers opinion, natural gas is the most performing and the less expensive energy source for domestic uses. In this optimistic context, the customers expectations for more performing, economical and aesthetic appliances and systems is growing up. This paper gives a general overview of the recent improvements of natural gas heating systems and appliances: high efficiency heating plants, mural and airtight central heating plants, condensation heating plants, heaters, mono- or dual-pipe heating installations, heating floors etc.. All these products have a significant effect on the thermal comfort of residential buildings and on the reduction of energy costs. (J.S.)

  20. Impact of domestic and tertiary buildings heating by natural gas in the Italian context

    International Nuclear Information System (INIS)

    Aste, Niccolò; Del Pero, Claudio

    2012-01-01

    Natural Gas (NG) is commonly used for satisfying population needs for heating, domestic hot water production and cooking, particularly in countries where the price of electricity is high. Typically, NG is extensively distributed on urbanized territory and can be exploited by using different technologies. As a consequence, primary energy is usually consumed directly in buildings, allowing high efficiency conversion but also producing pollutants in urban areas. In this paper a comprehensive analysis on NG use in the Italian domestic and tertiary building sector has been carried out, in order to evaluate energy and environmental impact of this fuel on different climatic and geographical contexts, also considering the temporal fluctuation of consumption. The aim of the work is to trace a reliable and up-to-date scenario of NG employment for building heating in Italy, which is one of the EU countries where this source is more widely used. The study was carried out under the research program “Analysis and evaluation of the current status of the reduction measures of environmental impacts due to heating energy consumption in Italy”, funded by the Italian Ministry of Environment. The data presented are an essential basis for the development of building energy efficiency and consumption rationalization policies. - Highlights: ► Detailed assessment of natural gas consumption and emission for residential and tertiary buildings heating in Italy. ► Estimation of the average specific primary energy consumption for households heating in different climatic contexts. ► Nationwide, it is the first study on the whole country with this level of detail.

  1. Cost-effectiveness of solar energy in energy-efficient buildings; Kosten und Nutzen von Solarenergie in energieeffizienten Bauten

    Energy Technology Data Exchange (ETDEWEB)

    Kessler, S.; Iten, R.; Vettori, A. [Infras, Zuerich (Switzerland); Haller, A.; Ochs, M. [Ernst Schweizer AG, Hedingen (Switzerland); Keller, L. [Bureau d' Etudes Keller-Burnier, Lavigny (Switzerland)

    2005-07-01

    This report for the Swiss Federal Office of Energy (SFOE) presents the results of a study that examined the potentials and restraints with respect to the use of solar energy in the new construction and refurbishment of residential buildings in Switzerland. The method used is based on a 'learning-curve' technique. The first part of the report deals with the development of prices for solar-collector installations from 1990 until now. The second part deals with today's costs and future developments up to the year 2030. A reference building is used as the basis for the comparison of eight system variants. A further eight variants combine solar technology with traditional heating installations such as oil, gas and wood boilers and heat-pumps. Scenarios for the market situation for solar energy in 2030 are discussed.

  2. Study for North-Baranja gas network installation

    International Nuclear Information System (INIS)

    Anders, S.; Komornoki, L.

    1999-01-01

    The public administration in Osijecko-Baranjska County in East Slavonia strives for ensuring gas supply for the North Baranja region as part of the regional reconstruction program. MOL Co., Ruhrgas AG., and WGV Co. and Partners have declared their willingness to explore and study the opportunities of gas supply in North Baranja in Croatia. In this context, the three partners have jointly prepared a feasibility study. The study contains four sections: the first briefly outlines the present status in North Baranja and describes the methods of preparing natural gas consumption forecasts. The second section addresses issues related to the dimensioning of the high pressure system transporting gas from Hungary into North Baranja in Croatia, and the required capital expenditures. The third section presents the concept of technical design and engineering, the time planned for implementation as well as capital expenditures for the distribution system. The fourth section introduces the method and results of the profitability analysis. Natural gas consumption in North Baranja is estimated as 20 mcm by 2010. The basic assumption for technical dimensioning the natural gas transmission system, of the region is that the following system components will need to be constructed: 23 km long (PN 25) high pressure system, and 143 km long (PN; 4 bar) medium pressure system, finally 287 km distribution system in cities/ villages. Total capital expenditures for constructing the distribution network are MDEM 32,5 (using 1998 cost levels), according to the study. Of that, the share of the high pressure system will be 20%, the medium pressure system 28,3% and the local distribution network 51,7% (including connections of houses). To prepare the profitability analysis for natural gas supply of North Baranja we used the method of planning a nominal profit statement, balance sheet and cash flow up to 2013. The profitability analysis followed the four options developed for natural gas supply

  3. Steam System Balancing and Tuning for Multifamily Residential Buildings in Chicagoland - Second Year of Data Collection

    Energy Technology Data Exchange (ETDEWEB)

    Choi, J.; Ludwig, P.; Brand, L.

    2013-08-01

    Steam heated buildings often suffer from uneven heating as a result of poor control of the amount of steam entering each radiator. In order to satisfy the heating load to the coldest units, other units are overheated. As a result, some tenants complain of being too hot and open their windows in the middle of winter, while others complain of being too cold and are compelled to use supplemental heat sources. Building on previous research, CNT Energy identified 10 test buildings in Chicago and conducted a study to identify best practices for the methodology, typical costs, and energy savings associated with steam system balancing. A package of common steam balancing measures was assembled and data were collected on the buildings before and after these retrofits were installed to investigate the process, challenges, and the cost effectiveness of improving steam systems through improved venting and control systems. The test buildings that received venting upgrades and new control systems showed 10.2% savings on their natural gas heating load, with a simple payback of 5.1 years. The methodologies for and findings from this study are presented in detail in this report. This report has been updated from a version published in August 2012 to include natural gas usage information from the 2012 heating season and updated natural gas savings calculations.

  4. Gas and water permeability of concrete for reactor buildings small specimens

    International Nuclear Information System (INIS)

    Mills, R.H.

    1986-03-01

    The effect on permeability of artifical aging by drying shrinkage and by freeze-thaw was determined by observing mass transfer of gas and water under a pressure gradient. It was found that damage due to freeze-thaw was negligible but that cracking around aggregate caused by drying shrinkage resulted in significantly increased permeability to both gas and water. The absence of freeze-thaw damage was attributed to self-dessication. Since the concrete was not exposed to an external source of water, the chemical reaction was sustained by consumption of mixing water. The resulting air voids were, apparently, sufficient to absorb expansive pressures due to ice formation. The response to lateral prestress was different for cracked and uncracked concrete. Although, in all cases, increased prestress resulted in reduced leakage, the effect was stronger in cracked concrete. Mean pore diameter as determined by gas diffusion was not, however, substantially affected because the leakage in cracked concrete remained very low. Reinforcing steel did not have a great influence on permeability of small specimens. Gas transmission through concrete was strongly influenced by moisture content. Free moisture constituted a barrier to gas flow, acting as a virtual solid. This is important since aging of concrete results in reduced free moisture. Ultrasonic pulse velocity appeared to vary with moisture content and porosity of concrete in the same way as gas permeability and gave promise of being effective for in-situ monitoring of concrete in reactor buildings

  5. How to prevent greenhouse gas emissions in electrical installations: lighting energy savings and solar energy approaches

    Energy Technology Data Exchange (ETDEWEB)

    Yavuz, C.; Aksoy, C. [Sakarya University, Faculty of Engineering, Electrical and Electronics Engineering Department, Serdivan (Turkey)

    2012-07-01

    Day by day greenhouse gas emissions increase dramatically. A passive adaptive method of lighting energy savings, daylight responsive systems are considered one of the best solutions for energy efficiency, saving and prevent CO{sub 2} emissions. Results of an annual experiment which was held in Sakarya University proves the necessity of daylight responsive systems with a 41% energy saving and 942.5 kg of prevented CO{sub 2} emissions Thinking this prevention is realized just only in a 36 m{sup 2} room with the use of 8 luminaries spreading such systems to nationwide, a major amount of greenhouse gas emissions would be prohibited. On the other hand energy saving is not the only way to reduce CO{sub 2} emissions. Again in Sakarya University a project has started to investigate the possibility of illumination of a complete building by using solar energy. This paper evaluates these mentioned systems both in energy efficiency, greenhouse gas emissions prevention and economic point of views. (author)

  6. Proposal for the award of an industrial support contract for the maintenance of and work on tertiary buildings at CERN, and operation of their installations

    CERN Document Server

    2005-01-01

    This document concerns the award of a contract for maintenance of and work on tertiary (i.e. non-accelerator) buildings and operation of their installations. The Finance Committee is invited to agree to the negotiation of a contract with the consortium CEGELEC CENTRE EST (FR) â?" CEGELEC (CH) â?" G.T.M. (FR), the lowest bidder complying with the specification, for the provision of the maintenance of and work on tertiary buildings at CERN, and operation of their installations, for three years for a total amount not exceeding 9 346 650 euros (14 379 454 Swiss francs), not subject to revision until 1st January 2009, with options for additional services for an amount not exceeding 457 600 euros (704 000 Swiss francs), not subject to revision until 1st January 2009, bringing the total to an amount not exceeding 9 804 250 euros (15 083 454 Swiss francs), not subject to revision until 1st January 2009. The contract will include options for two one-year extensions beyond the initial three-year period.

  7. State-of-the-art of NORM nuclide determination in samples from oil and gas production : Validation of potential standardization methods through an interlaboratory test programme

    NARCIS (Netherlands)

    Knaepen, WAI; Bergwerf, W; Lancee, PJF; vanDijk, W; Jansen, JFW; Janssen, RGC; Kiezenberg, WHT; vanSluijs, R; Tijsmans, MH; Voors, PI

    1995-01-01

    Gas and oil companies frequently encounter build-up of Naturally Occurring Radioactive Material (NORM) in their production and processing facilities. In the Netherlands NORM is subject to strict national regulations and, consequently, installations have to be screened on a regular basis. The

  8. Results of gas monitoring of double-shell flammable gas watch list tanks

    International Nuclear Information System (INIS)

    Wilkins, N.E.

    1995-01-01

    Tanks 103-SY; 101-AW; 103-, 104-, and 105-AN are on the Flammable Gas Watch List. Recently, standard hydrogen monitoring system (SHMS) cabinets have been installed in the vent header of each of these tanks. Grab samples have been taken once per week, and a gas chromatograph was installed on tank 104-AN as a field test. The data that have been collected since gas monitoring began on these tanks are summarized in this document

  9. Problems of Technology of Energy-Saving Buildings and Their Impact on Energy Efficiency in Buildings

    Science.gov (United States)

    Kwasnowski, Pawel; Fedorczak-Cisak, Malgorzata; Knap, Katarzyna

    2017-10-01

    Introduction of EPBD in legislation of the EU member states caused that buildings must meet very stringent requirements of thermal protection and energy efficiency. On the basis of EPBD provisions, EU Member States introduce standard of NZEB (Nearly Zero-Energy Buildings). Such activities cause a need for new, innovative materials and technologies, and new approaches to design, construction and retrofitting of buildings. Indispensable is the precise coordination of the design of structure and technical installations of building, which may be provided in an integrated design process in the system BIM. Good coordination and cooperation of all contractors during the construction phase is also necessary. The article presents the problems and the new methodology for the design, construction and use of energy efficient buildings in terms of energy saving technologies, including discussion of the significant impact of the automation of technical installations on the building energy efficiency.

  10. Building America Case Study: Addressing Multifamily Piping Losses with Solar Hot Water, Davis, California

    Energy Technology Data Exchange (ETDEWEB)

    2016-12-01

    Solar thermal water heating is most cost effective when applied to multifamily buildings and some states offer incentives or other inducements to install them. However, typical solar water heating designs do not allow the solar generated heat to be applied to recirculation losses, only to reduce the amount of gas or electric energy needed for hot water that is delivered to the fixtures. For good reasons, hot water that is recirculated through the building is returned to the water heater, not to the solar storage tank. The project described in this report investigated the effectiveness of using automatic valves to divert water that is normally returned through the recirculation piping to the gas or electric water heater instead to the solar storage tank. The valves can be controlled so that the flow is only diverted when the returning water is cooler than the water in the solar storage tank.

  11. Radioactivity in produced water from Norwegian oil and gas installations - concentrations, bioavailability and doses to marine biota

    Energy Technology Data Exchange (ETDEWEB)

    Sidhu, R.; Eriksen, D. Oe.; Straalberg, E.; Iden, K. I.; Rye, H.; Hylland, K.; Ruus, A.; Roeyset, O.; Berntssen, M. H. G.

    2006-03-15

    Substantial amounts of produced water, containing elevated levels of radionuclides (mainly 226Ra and 228Ra) are discharged to the sea as a result of oil and gas production on the Norwegian Continental Shelf. So far no study has assessed the potential radiological effects on marine biota in connection with radionuclide discharges to the North Sea. The main objective of the project is to establish radiological safe discharge limits for radium, lead and polonium associated with other components in produced water from oil and gas installations on the Norwegian continental shelf. Preliminary results indicate that presence of added chemicals such as scale inhibitors in the produced water has a marked influence on the formation of radium and barium sulphates when produced water is mixed with sea water. Thus, the mobility and bio-availability of radium (and barium) may be larger than anticipated. Also, the bio-availability of radium may be increased due to presence of such chemicals, and this is presently being studied. (author) (tk)

  12. Seminar series on `Technical building installations`. The example of refrigeration technology for air conditioning plants. Practice-oriented advanced training at Technische Akademie Esslingen training centre. Seminar series on `Technical building installations`; Lehrgangsreihe ``Technische Gebaeudeausruestung``. Beispiel: Kaeltetechnik in Klimaanlagen. Praxisnahe Fortbildung am Weiterbildungszentrum Technische Akademie Esslingen. Lehrgangsreihe ``Technische Gebaeudeausruestung``

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1995-04-01

    The advanced training on ``Technical Building Installations`` at the Technische Akademie Esslingen has been held regularly over a period of 18 years now. The training lasts several days and comprises a total of 12 courses on the subjects: ventilation and air-conditioning, stages A-D; refrigeration, stage A; refrigeration in air conditioning glants; energy concepts for buildings and industry, stages A and B; heating in old and new buildings; sanitation, stages A and B; and, sanitation in old and new buildings. In the present article the structure of the training is illustrated for the example of refrigeration in air conditioning plants. The article also discusses questions concerning the assessment of the training and its benefit to the participants. (BWI) [Deutsch] Seit nunmehr 18 Jahren wird an der Technischen Akademie Esslingen TAE die mehrtaegige Fortbildungsveranstaltung ``Technische Gebaeudeausruestung`` durchgefuehrt. Insgesamt werden in diesem gesamten Themenkomplex 12 Lehrgaenge angeboten: Raumlufttechnik, Teil A-D; Kaeltetechnik Teil A - Kaeltetechnik in Klimaanlagen, Energiekonzepte fuer Gebaeude und Industrie, Teil A und B, Heiztechnik in Neu- und Altbauten, Sanitaertechnik Teil A und B. Am Beispiel des Themenbereiches Kaeltetechnik in Klimaanlagen wird die Lehrgangsausrichtung dargestellt. Ferner werden Fragen der Lehrgangsbewertung und der Nutzen fuer die Teilnehmer diskutiert. (BWI)

  13. Residential Central Air Conditioning and Heat Pump Installation – Workshop Outcomes

    Energy Technology Data Exchange (ETDEWEB)

    Goetzler, William [Navigant Consulting, Burlington, MA (United States); Zogg, Robert [Navigant Consulting, Burlington, MA (United States); Young, Jim [Navigant Consulting, Burlington, MA (United States); Bargach, Youssef [Navigant Consulting, Burlington, MA (United States)

    2016-11-01

    DOE's Building Technologies Office works with researchers and industry partners to develop and deploy technologies that can substantially reduce energy consumption in residential and commercial buildings. This report aims to advance BTO’s energy savings, emissions reduction, and other program goals by identifying research and development (R&D), demonstration and deployment, and other non-regulatory initiatives for improving the design and installation of residential central air conditioners (CAC) and central heat pumps (CHP). Improving the adoption of CAC/CHP design and installation best practices has significant potential to reduce equipment costs, improve indoor air quality and comfort, improve system performance, and most importantly, reduce household energy consumption and costs for heating and cooling by addressing a variety of common installation issues.

  14. 30 CFR 817.180 - Utility installations.

    Science.gov (United States)

    2010-07-01

    ... PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS-UNDERGROUND MINING ACTIVITIES § 817.180 Utility installations. All underground mining activities shall be conducted in a manner...; oil, gas, and coal-slurry pipelines, railroads; electric and telephone lines; and water and sewage...

  15. Transmission power control for wireless home and building automation

    NARCIS (Netherlands)

    Bacchiani, C.

    2015-01-01

    Home and building automation can provide significant improvements in comfort and energy efficiency of buildings. However, its diffusion is hindered by the complexity of installation and maintenance. Wireless connectivity can simplify this process, reducing installation time and cost, but it requires

  16. Public building retrofit

    Energy Technology Data Exchange (ETDEWEB)

    1982-01-01

    This report demonstrates the economic viability of cost effective, energy efficient retrofitting of a public building. The Whitehorse Chamber of Commerce in conjunction with the Canada/Yukon Conservation and Renewable Energy Demonstration Project undertook the demonstration project. The energy conservation features included increasing the insulation in the walls and ceiling, providing a 6 mm polyethylene air-vapour barrier and installing triple glazed windows on the north side. Also, an air-to-air heat exchanger and a combination wood/oil furnace were installed. However, neither of these latter features have been used since the completion of the renovations. In total, the features cost approximately $26,300. The energy conservation measures yielded less energy savings than expected. Although the T.C. Richard building is now consuming less heating oil (33% less); the amount of electricity used has increased by 146.6%. Overall the building achieved a 23% reduction in heating consumption (this figure takes into account the heat energy generated from the lighting system). Reasons for the low yield in energy savings can be attributed to the improper installation of the air-vapour barrier and not using the existing wood boiler. 1 fig. 5 tabs.

  17. Silence please? Noise from installations in school buildings; Kan het iets stiller? Installatiegeluid in frisse scholen

    Energy Technology Data Exchange (ETDEWEB)

    Buijs, J.H.N.; Koornneef, W. [Peutz, Zoetermeer (Netherlands)

    2011-10-15

    Air quality in Dutch school buildings often very poor. Mechanical ventilation systems are installed to improve the air quality. In practice some mechanical ventilation, especially local systems with a fan in or nearby the classroom lead to unacceptable noise levels. This can result in the ventilation system being turned off and thus less air quality. Therefore, a low noise level should be an integral part of the design of the ventilation system. [Dutch] Het binnenklimaat in veel scholen is ronduit slecht, in meer dan 80% van de scholen wordt onvoldoende geventileerd, is er sprake van tocht of is het in de zomer te warm. De in 2009 verschenen ISSO publicatie 89 formuleert eisen en geeft oplossingen om tot verbetering te komen. De praktijk leert echter dat een deel van de voorgestelde mechanische ventilatiesystemen overmatige geluidsniveaus en geluidhinder veroorzaken.

  18. IMCOM LONWORKS Building Automation Systems Implementation Strategy

    National Research Council Canada - National Science Library

    Schwenk, David M; Bush, Joseph; Hughes, Lucie M; Briggs, Stephen; White, Will

    2007-01-01

    Army Installations often expand their use of digital control systems for heating, ventilating, and air conditioning and other mechanical and electrical building systems on a building-by-building basis...

  19. Sector trends and driving forces of global energy use and greenhouse gas emissions: focus in industry and buildings

    Energy Technology Data Exchange (ETDEWEB)

    Price, Lynn; Worrell, Ernst; Khrushch, Marta

    1999-09-01

    Disaggregation of sectoral energy use and greenhouse gas emissions trends reveals striking differences between sectors and regions of the world. Understanding key driving forces in the energy end-use sectors provides insights for development of projections of future greenhouse gas emissions. This report examines global and regional historical trends in energy use and carbon emissions in the industrial, buildings, transport, and agriculture sectors, with a more detailed focus on industry and buildings. Activity and economic drivers as well as trends in energy and carbon intensity are evaluated. The authors show that macro-economic indicators, such as GDP, are insufficient for comprehending trends and driving forces at the sectoral level. These indicators need to be supplemented with sector-specific information for a more complete understanding of future energy use and greenhouse gas emissions.

  20. Sector trends and driving forces of global energy use and greenhouse gas emissions: focus in industry and buildings

    International Nuclear Information System (INIS)

    Price, Lynn; Worrell, Ernst; Khrushch, Marta

    1999-01-01

    Disaggregation of sectoral energy use and greenhouse gas emissions trends reveals striking differences between sectors and regions of the world. Understanding key driving forces in the energy end-use sectors provides insights for development of projections of future greenhouse gas emissions. This report examines global and regional historical trends in energy use and carbon emissions in the industrial, buildings, transport, and agriculture sectors, with a more detailed focus on industry and buildings. Activity and economic drivers as well as trends in energy and carbon intensity are evaluated. The authors show that macro-economic indicators, such as GDP, are insufficient for comprehending trends and driving forces at the sectoral level. These indicators need to be supplemented with sector-specific information for a more complete understanding of future energy use and greenhouse gas emissions

  1. Formulation of models for determination of the fuel gas demand and consumption in residential buildings; Formulacao de modelos para determinacao da demanda e consumo de gas combustivel em edificios residenciais

    Energy Technology Data Exchange (ETDEWEB)

    Ilha, Marina Sangoi de Oliveira [Universidade Estadual de Campinas, SP (Brazil). Faculdade de Engenharia Civil. Dept. de Hidraulica e Saneamento; Goncalves, Orestes Marracini [Sao Paulo Univ., SP (Brazil). Escola Politecnica. Dept. de Engenharia de Construcao Civil

    1996-07-01

    This work presents models for design flow rate and gas volume determination in residential buildings. First, an experimental investigation, applied on a sample of residential buildings at Sao Paulo, Brazil, is described, which essentially consisted in the filling of a form and measurement of gas volume at one minute interval during 10 days (mean). From this data, it was performed a regression analysis in order to explain design flow rate (demand) and gas volume values (consumption), based on different variables. Models proposed on this work are different from the current applied methodology due to their 'open' approach, that is, involved variables can be explicitly found in formulas. (author)

  2. Operation and maintenance of the technical installations in buildings

    DEFF Research Database (Denmark)

    Nielsen, O.(red.)

    The report contains twelve papers from a seminar on operation and maintenance, held at the Danish Building Research Institute in October 1976. The papers deal, among other things, with dimensioning and balancing of pipesystems, design of ventilating systems for adequate operation and maintenance,......, cost and quality in maintenance, maintenance service companies, as well as organization and training for building services maintenance....

  3. Energy efficiency measures for offshore oil and gas platforms

    DEFF Research Database (Denmark)

    Nguyen, Tuong-Van; Voldsund, Mari; Breuhaus, Peter

    2016-01-01

    . They include: (i) the installation of multiple pressure levels in production manifolds, (ii) the implementation of multiphaseexpanders, (iii) the promotion of energy and process integration, (iv) the limitation of gas recirculation around the compressors, (v) the exploitation of low-temperature heat from...... the gas cooling steps, (vi) the downsizing or replacement of the existing gas turbines, and (vii) the use of the waste heat from the powerplant. The present study builds on four actual cases located in the North and Norwegian Seas, which differ by the type of oil processed, operating conditions...... and strategies. The benefits and practical limitations of each measure are discussed based on thermodynamic, economic and environmental factors. Signiffcant energy savings and reductions in CO2-emissions are depicted, reaching up to 15-20 %. However, they strongly differ from one facility to another, which...

  4. Impact of PID on industrial rooftop PV-installations

    Science.gov (United States)

    Buerhop, Claudia; Fecher, Frank W.; Pickel, Tobias; Patel, Tirth; Zetzmann, Cornelia; Camus, Christian; Hauch, Jens; Brabec, Christoph J.

    2017-08-01

    Potential induced degradation (PID) causes severe damage and financial losses even in modern PV-installations. In Germany, approximately 19% of PV-installations suffer from PID and resulting power loss. This paper focuses on the impact of PID in real installations and how different evaluated time intervals influence the performance ratio (PR) and the determined degradation rate. The analysis focuses exemplarily on a 314 kWp PV-system in the Atlantic coastal climate. IR-imaging is used for identifying PID without operation interruption. Historic electric performance data are available from a monitoring system for several years on system level, string level as well as punctually measured module string IV- curves. The data sets are combined for understanding the PID behavior of this PV plant. The number of PID affected cells within a string varies strongly between 1 to 22% with the string position on the building complex. With increasing number of PID-affected cells the performance ratio decreases down to 60% for daily and monthly periods. Local differences in PID evolution rates are identified. An average PR-reduction of -3.65% per year is found for the PV-plant. On the string level the degradation rate varied up to 8.8% per year depending on the string position and the time period. The analysis reveals that PID generation and evolution in roof-top installations on industrial buildings with locally varying operation conditions can be fairly complex. The results yield that local operating conditions, e.g. ambient weather conditions as well as surrounding conditions on an industrial building, seem to have a dominating impact on the PID evolution rate.

  5. Gas-fired power plants: Investment timing, operating flexibility and CO2 capture

    International Nuclear Information System (INIS)

    Fleten, Stein-Erik; Naesaekkaelae, Erkka

    2010-01-01

    We analyze investments in gas-fired power plants based on stochastic electricity and natural gas prices. A simple but realistic two-factor model is used for price processes, enabling analysis of the value of operating flexibility, the opportunity to abandon the capital equipment, as well as finding thresholds for energy prices for which it is optimal to enter into the investment. We develop a method to compute upper and lower bounds on plant values and investment threshold levels. Our case study uses representative power plant investment and operations data, and historical forward prices from well-functioning energy markets. We find that when the decision to build is considered, the abandonment option does not have significant value, whereas the operating flexibility and time-to-build option have significant effect on the building threshold. Furthermore, the joint value of the operating flexibility and the abandonment option is much smaller than the sum of their separate values, because both are options to shut down. The effects of emission costs on the value of installing CO 2 capture technology are also analyzed.

  6. 46 CFR 115.702 - Installation tests and inspections.

    Science.gov (United States)

    2010-10-01

    ... CERTIFICATION Repairs and Alterations § 115.702 Installation tests and inspections. Whenever a launching appliance, survival craft, rescue boat, fixed gas fire extinguishing system, machinery, fuel tank, or...

  7. Installing Ubuntu Enterprise Cloud in a Physical Environment

    DEFF Research Database (Denmark)

    Pantić, Zoran; Ali Babar, Muhammad

    This document contains the supplemental material to “Guidelines for Building a Private Cloud Infrastructure.” This supplemental material provides guidance on how to install Ubuntu Enterprise Cloud in a physical environment. The purpose of this document is to provide a practical, step......-by-step, detailed guide on how to pre-configure and install the machines and network. For more detailed description of the steps, a reader is advised to refer to another supplemental book named “Installing and Scaling out Ubuntu Enterprise Cloud in Virtual Environment.” There are a few more details, accompanied...... with screenshots. The material included in this supplemental document is based on the installation that was performed in a physical environment based on HP ProLiant DL380 G4 servers, 100 Mbit/s witches, and a firewall/router that isolated the whole solution. The cloud installation was performed using the (for...

  8. Designing in-building optical fiber networks

    NARCIS (Netherlands)

    Koonen, A.M.J.; Boom, van den H.P.A.; Tangdiongga, E.; Jung, H.D.; Guignard, P.

    2010-01-01

    Optical fiber in-building networks carrying wired and wireless services can outperform CAT-5E networks regarding versatility and installation costs. POF-based point-to-point architectures are optimum for small buildings, and (optically routed) SMF-based bus architectures for larger buildings.

  9. Lifecycle performance. Special issue on management and maintenance, hybrid ventilation concepts, installation-low buildings; Lifecycle performance. Themanummer over beheer en onderhoud, hybride ventilatieconcepten, installatie-arme gebouwen

    Energy Technology Data Exchange (ETDEWEB)

    Thierauf, I. [Universiteit Utrecht, Utrecht (Netherlands); Kurvers, S.R.; Van den Ham, E.R.; Leijten, J.L. [Sectie Climate Design and Sustainability, Afdeling Architectural Engineering and Technology, Faculteit Bouwkunde, Technische Universiteit Delft TUD, Delft (Netherlands); Juricic, S. [Ecole National des Travaux Publics de l' Etat, Lyon (France); Jacobs, P. [Afdeling Energy and Comfort Systems, TNO, Delft (Netherlands); Versteeg, H. [LBP Sight, Nieuwegein (Netherlands); Van Loon, P.P.M. [Stichting Scholen van Morgen, Rotterdam (Netherlands); Hoek, H.C.; Van Eeden, H.; Nibbelink, J. [Collectief C-on, Haarlem (Netherlands); Veerman, J.; Maassen, W.H. [Royal Haskoning DHV, Nijmegen (Netherlands); Derksen, A.H.P. [ISSO, Rotterdam (Netherlands); Morren, K. [Universiteit Twente, Enschede (Netherlands)

    2012-12-15

    In 9 articles various aspects regarding the title topic are discussed: energy efficiency and user comfort, ventilation in new houses with balanced ventilation, the revised assessment for ventilation performance, air quality in school buildings, buildings with only a few installations, hybrid ventilation, the management and maintenance process, and future performance requirements [Dutch] In 9 artikelen wordt aandacht besteed aan diverse aspecten m.b.t. het titelonderwerp: energie-efficientie en gebruikerscomfort, ventilatie in nieuwbouwwoningen met balansventilatie, de herziene beoordelingsrichtlijn ventilatie prestatie, luchtkwaliteit in schoolgebouwen, installatie-arme gebouwen, hybride ventilatie, het beheer- en onderhoudsproces, en de toekomstige prestatie-eisen.

  10. Solar Water Heater Installation Package

    Science.gov (United States)

    1982-01-01

    A 48-page report describes water-heating system, installation (covering collector orientation, mounting, plumbing and wiring), operating instructions and maintenance procedures. Commercial solar-powered water heater system consists of a solar collector, solar-heated-water tank, electrically heated water tank and controls. Analysis of possible hazards from pressure, electricity, toxicity, flammability, gas, hot water and steam are also included.

  11. Thermo Active Building Systems – Using Building Mass To Heat and Cool

    DEFF Research Database (Denmark)

    Olesen, Bjarne W.

    2014-01-01

    , Austria, Netherlands, etc.), this type of system has been installed in a significant number of new office buildings since the late 1990s. The trend is spreading to other parts of the world (the rest of Europe, North America and Asia). Thermo active building systems (TABS) are primarily used for cooling...

  12. Installing and Scaling out Ubuntu Enterprise Cloud in Virtual Environment

    DEFF Research Database (Denmark)

    Pantić, Zoran; Ali Babar, Muhammad

    This document contains the supplemental material to the book “Guidelines for Building a Private Cloud Infrastructure”. This document provides guidance on how to install Ubuntu Enterprise Cloud in virtual environment, and afterwards how to scale out when needed. The purpose of this supplemental book...... is to provide a practical, step-by-step, detailed guide on how to dimension and install the machines and network. Some initial steps of configuring the cloud are also covered. The installation is performed in a virtual environment based on Windows 7 and VMware Workstation 7. The cloud installation is performed...... cloud, both using the command line tools, and GUI based tool HybridFox....

  13. Prevention of radioactive gas seeping into buildings through constructive materials

    International Nuclear Information System (INIS)

    Khaydarov, R.A.; Gapurova, O.U.; Khaydarov, R.R.

    2004-01-01

    Full text: One of possible method of realization of the terrorist acts is using gases and liquids, which easily permeate through the constructive materials of walls, floor, ceiling, roof, etc. into buildings by the capillary action of the pores. Toxic volatile organic compounds, organic and inorganic gases, radioactive elements, especially, which emits alpha particles can be used as the dangerous substances. Increased ventilation may help in removing the gases, but can actually increase the gases level by increasing the suction through the pores of concrete. If the gases and liquids are soluble in water and are easily volatilized from it, they can also get by groundwater up to underground structures and penetrate inside through opening and pores in concrete or pushed by hydrostatic pressure. The purpose of this work is creating a method to reduce concentration of toxic and radioactive gases in homes, buildings, underground buildings, tunnels, hangars, garages, bomb shelters, etc. The most effective method to prevent penetration of radionuclides into premises of buildings and underground structures through walls, roofs, floors is using special chemicals, which seal micropores inside the construction materials against gases. Worked out chemicals which consist of blend of polymeric compounds are described in the paper. Radioactive gases permeability in constructive materials after treatment by chemicals was studied. Influence of types of cement, sand and gypsum, preliminary treatment by different chemicals, different types of polymeric compounds, time between treatments, moisture of materials, time between preparation of chemicals and treatment of materials (aging of chemicals), time between treatment of concrete and testing (aging of treated concrete) were examined. Experiments have shown that our method allows reducing the coefficient of gas permeability 200 - 400 times

  14. Exergetic analysis of the heat pump installed in the Limmat school building in Zurich; Exergieanalyse der Waermepumpe im Schulhaus Limmat - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Friedl, M.

    2009-10-15

    In large buildings, heat pumps todays are only used in a small number of cases. In those rare cases, they are operated with synthetic working fluids and are mainly used for low temperature heating. Since January 2006, a heat pump with Propane as working fluid has been operating in a school building in Zuerich (Schulhaus Limmat), which provides space heating and hot water for the old building erected in 1909. As a heat source, a main channel of sewage is used, an ideal heat source, which is only rarely used nowadays. Hence, the installation has a pioneering role in many aspects and has been analysed in detail during the current project. During this project, the Propane heat pump in the Schulhaus Limmat as well as the hydraulic system have been analysed in respect to its exergetic losses. The heat pump has a seasonal performance factor of 2.7. The investigation has shown that the heat pump does not operate in an optimal way and that the hydraulic has room for improvement with respect to exergetic losses. In implementing the measures suggested in this report, the seasonal performance factor can be increased to about 4.4. (author)

  15. Questions for the nuclear installations inspectorate

    International Nuclear Information System (INIS)

    Conroy, C.; Flood, M.; MacRory, R.; Patterson, W.C.

    1976-01-01

    The responsibilities of the Nuclear Installations Inspectorate are considered, and the responsibilities of other bodies for (a) reprocessing and enrichment, and (b) security. Questions for the Nuclear Installations Inspectorate are then set out under the following heads: general (on such topics as vandalism, sabotage, threats, security, reactor incidents); magnox reactors; corrosion; advanced gas-cooled reactor; steam generating heavy water reactor; fast breeder reactor; reproces-sing and waste. Most of the questions are concerned with technical problems that have been reported or might possibly arise during construction or operation, affecting the safety of the reactor or process. (U.K.)

  16. RFAR installation for Buildings 703, 712, 747, 748 and 1163

    International Nuclear Information System (INIS)

    Ferry, M.

    1995-01-01

    This document is to certify the installation and testing of the Radio Fire Alarm Reporting box (RFAR). The Hanford Fire Dept. will be notified of troubles via RFAR. The document outlines prerequisites, necessary equipment, and the fire alarm system test to insure the system is operating correctly

  17. FY 1989 report on the results of the development of the entrained bed coal gasification power plant. Part 3. Fabrication/installation of pilot plant (Fabrication/installation drawings and fabrication/installation pictures - 1/2); 1989 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 3. Pilot plant seisaku suetsuke hen (Seisaku suetsukezu oyobi seisaku suetsuke shashin) (1/2)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-03-01

    For the purpose of establishing the technology of the integrated coal gasification combined cycle power generation, the fabrication, installation work, etc. were conducted of a 200t/d entrained bed coal gasification pilot plant, and drawings of fabrication/installation in the FY 1989 were summarized. In fabrication/installation drawings, drawings of the following were included: layout of the total system and the yard, gasifier facilities (assembly drawing of the pressure part of gasifier, drawing of machinery arrangement of gasifier facilities, system diagram of raw coal receiving device, system diagram of pulverized coal feed equipment, system diagram of char feed equipment, etc.), gas refining facilities - dry desulfurizer (assembly drawing of desulfurizing agent carrying filter, assembly drawing of regeneration tower filter, structural drawing of SO{sub 2} reduction tower filter, assembly drawing of start-up heater, etc.), gas refining facilities - dry dust removal system (assembly drawing of No.1 dust separation filter, installation drawing of elevator, etc.), gas turbine facilities (cross section of gas turbine, front view of gas turbine, structural cross section of gas turbogenerator, etc.), actual-pressure/actual-size combustor test equipment (structural drawing of test stand, structural drawing of exhaust temperature reduction device, assembly/sectioned drawing of low-pressure air compressor, etc.) (NEDO)

  18. Emergency gas processing device

    International Nuclear Information System (INIS)

    Taruishi, Yoshiaki; Sasaki, Susumu.

    1984-01-01

    Purpose: To enable the reduction of radioactive substances released out of reactor buildings irrespective of the aging change in the buildings. Constitution: There are provided an exhaust gas flow channel for cleaning contaminated airs within a reactor building by way of a series of filters and exhausting the cleaned airs by means of exhaust fans to the outside and a gas recycling flow channel having a cooler in connection with the exhaust gas flow channel at a position downstream of the exhaust fans for returning the cleaned airs in the exhaust gas flow channel to the inside of the reactor buildings. The pressure difference between the outside and the inside of the reactor buildings is made constant by controlling the air flow channel within the gas recycling flow channel by a flow control valve. The airs cleaned by the series of the filters are recycled to the inside of the buildings to decrease the radioactive substance within the buildings. (Horiuchi, T.)

  19. Block Gas Sol Unit in Haderslev

    DEFF Research Database (Denmark)

    Vejen, Niels Kristian

    2000-01-01

    Investigation of a SDHW system based on a Block Gas Sol Unit from Baxi A/S installed by a consumer i Haderslev, Denmark.......Investigation of a SDHW system based on a Block Gas Sol Unit from Baxi A/S installed by a consumer i Haderslev, Denmark....

  20. Safety reassessment of the old installations involved in fuel cycle

    Energy Technology Data Exchange (ETDEWEB)

    Guillard, M

    2003-01-01

    Since the early 1990's, CEA (French atomic energy commission) has been preparing a plan for the renovation of a laboratory situated at Cadarache and dedicated to the study of irradiated materials and fuels. The main aim of this renovation was the improvement of the seismic behaviour of the laboratory since it was not built according to the para-seismic rules now in force. The solution chosen, given the different projects studied, the provisional unavailability of the plant and the related costs, was a partial reinforcement of the building in association with a limited plant life time and the reduction of activities in the oldest part of the installation. Another aim of this renovation was a global upgrading of the safety concerning: -) radioactive material containment (upgrade of the first static barrier by reinforcing cell leak-proofing, installation of a second level of very high efficiency filtration at the cell outputs, and separation of cell and general building ventilation networks; -) fire protection (fire sectoring with the isolation of the premises involving safety-important equipment, replacement of the automatic fire detection system, and definition of a new piloting of ventilation in case of fire); -) power cut risks (installation of permanent sources for the power supply of safety-important equipment); and -) earthquake behaviour (addition of reinforced connections between the 3 parts of the building, strengthening of peripheral walls, widening of joints between cells and building, and reinforcement of the foundation of the concrete cells). (A.C.)

  1. Safety reassessment of the old installations involved in fuel cycle

    International Nuclear Information System (INIS)

    Guillard, M.

    2003-01-01

    Since the early 1990's, CEA (French atomic energy commission) has been preparing a plan for the renovation of a laboratory situated at Cadarache and dedicated to the study of irradiated materials and fuels. The main aim of this renovation was the improvement of the seismic behaviour of the laboratory since it was not built according to the para-seismic rules now in force. The solution chosen, given the different projects studied, the provisional unavailability of the plant and the related costs, was a partial reinforcement of the building in association with a limited plant life time and the reduction of activities in the oldest part of the installation. Another aim of this renovation was a global upgrading of the safety concerning: -) radioactive material containment (upgrade of the first static barrier by reinforcing cell leak-proofing, installation of a second level of very high efficiency filtration at the cell outputs, and separation of cell and general building ventilation networks; -) fire protection (fire sectoring with the isolation of the premises involving safety-important equipment, replacement of the automatic fire detection system, and definition of a new piloting of ventilation in case of fire); -) power cut risks (installation of permanent sources for the power supply of safety-important equipment); and -) earthquake behaviour (addition of reinforced connections between the 3 parts of the building, strengthening of peripheral walls, widening of joints between cells and building, and reinforcement of the foundation of the concrete cells). (A.C.)

  2. Optimisation of a green gas supply chain--a review.

    Science.gov (United States)

    Bekkering, J; Broekhuis, A A; van Gemert, W J T

    2010-01-01

    In this review the knowledge status of and future research options on a green gas supply based on biogas production by co-digestion is explored. Applications and developments of the (bio)gas supply in The Netherlands have been considered, whereafter literature research has been done into the several stages from production of dairy cattle manure and biomass to green gas injection into the gas grid. An overview of a green gas supply chain has not been made before. In this study it is concluded that on installation level (micro-level) much practical knowledge is available and on macro-level knowledge about availability of biomass. But on meso-level (operations level of a green gas supply) very little research has been done until now. Future research should include the modeling of a green gas supply chain on an operations level, i.e. questions must be answered as where to build digesters based on availability of biomass. Such a model should also advise on technology of upgrading depending on scale factors. Future research might also give insight in the usability of mixing (partly upgraded) biogas with natural gas. The preconditions for mixing would depend on composition of the gas, the ratio of gases to be mixed and the requirements on the mixture.

  3. INNOVATIVE HYBRID GAS/ELECTRIC CHILLER COGENERATION

    Energy Technology Data Exchange (ETDEWEB)

    Todd Kollross; Mike Connolly

    2004-06-30

    Engine-driven chillers are quickly gaining popularity in the market place (increased from 7,000 tons in 1994 to greater than 50,000 tons in 1998) due to their high efficiency, electric peak shaving capability, and overall low operating cost. The product offers attractive economics (5 year pay back or less) in many applications, based on areas cooling requirements and electric pricing structure. When heat is recovered and utilized from the engine, the energy resource efficiency of a natural gas engine-driven chiller is higher than all competing products. As deregulation proceeds, real time pricing rate structures promise high peak demand electric rates, but low off-peak electric rates. An emerging trend with commercial building owners and managers who require air conditioning today is to reduce their operating costs by installing hybrid chiller systems that combine gas and electric units. Hybrid systems not only reduce peak electric demand charges, but also allow customers to level their energy load profiles and select the most economical energy source, gas or electricity, from hour to hour. Until recently, however, all hybrid systems incorporated one or more gas-powered chillers (engine driven and/or absorption) and one or more conventional electric units. Typically, the cooling capacity of hybrid chiller plants ranges from the hundreds to thousands of refrigeration tons, with multiple chillers affording the user a choice of cooling systems. But this flexibility is less of an option for building operators who have limited room for equipment. To address this technology gap, a hybrid chiller was developed by Alturdyne that combines a gas engine, an electric motor and a refrigeration compressor within a single package. However, this product had not been designed to realize the full features and benefits possible by combining an engine, motor/generator and compressor. The purpose of this project is to develop a new hybrid chiller that can (1) reduce end-user energy

  4. The installation of helium auxiliary systems in HTGR

    International Nuclear Information System (INIS)

    Qin Zhenya; Fu Xiaodong

    1993-01-01

    The inert gas Helium was chosen as reactor coolant in high temperature gas coolant reactor, therefore a set of Special and uncomplex helium auxiliary systems will be installed, the safe operation of HTR-10 can be safeguarded. It does not effect the inherent safety of HTR-10 MW if any one of all those systems were damaged during operation condition. This article introduces the design function and the system principle of all helium auxiliary systems to be installed in HTR-10. Those systems include: helium purification and its regeneration system, helium supply and storage system, pressure control and release system of primary system, dump system for helium auxiliary system and fuel handling, gaseous waste storage system, water extraction system for helium auxiliary systems and evacuation system for primary system

  5. Vibration mechanism's isolation installed on the compliant base (Part I: Question State)

    International Nuclear Information System (INIS)

    Djuma, R.

    2001-01-01

    The main reason of noise and vibration aggravation in houses is the considerable increase of the number of sources because of building being equipped with engineering, sanitary, technical and other mechanical equipment (lifts, pumps, ventilation, conditioner, systems and others). Very often the equipment installed on the building's coverings, is not favorable from the acoustics point of view, in comparison with equipment that is installed on separate foundation or in the basement. Vibrations that appear on the coverings in the mechanism work through the joints and transfer to the joining buildings that in their part while vibration will take the sound of the adjacent buildings. Working in the mean time normative documents on projecting of machine's vibroisolation and equipment that guide projectors and builder's, recommend to make calculations of vibroisolation on the dynamic loading that is created by working equipment only on the basic vibration frequency. (author)

  6. Skaha Lake crossing, innovations in pipeline installation

    International Nuclear Information System (INIS)

    Fernandez, M.L.; Bryce, P.W.; Smith, J.D.

    1995-01-01

    This paper describes the construction of a 10.8 km long NPS16 (406 mm, 16 inch diameter) pipeline, across Skaha Lake, in the south Okanagan valley, British Columbia, Canada. The water crossing is part of the 32 km South Okanagan Natural Gas Pipeline Project (SONG) operated by BC Gas. The pipeline is located in a region dependent on year-round tourism. Therefore, the design and construction was influenced by sensitive environmental and land use concerns. From earlier studies, BC Gas identified surface tow or lay as preferred installation methods. The contractor, Fraser River Pile and Dredge departed from a conventional laybarge methodology after evaluating environmental data and assessing locally available equipment. The contractor proposed a surface tow with multiple surface tie-ins. This approach modification to the ''Surface Tow and Buoy Release Method'' (STBRM) used previously with success on relatively short underwater pipelines. A total of 10 pipe strings, up to 1 km long, were towed into position on the lake and tied-in using a floating platform. The joined pipeline was lowered to the lakebed by divers releasing buoys while tension was maintained from a winch barge at the free end of the pipeline. From analysis and field verified measurement the installation stresses were well below the allowable limits during all phases of construction. The entire construction, including mobilization and demobilization, lasted less than three months, and actual pipelaying less than three weeks. Installation was completed within budget and on schedule, without any environmental or safety related incidents. The SONG pipeline became operational in December 1994

  7. Gas engine supplied with fermentation gas

    Energy Technology Data Exchange (ETDEWEB)

    Cupial, K

    1978-01-01

    A CH/sub 4/-rich fermentation gas from the waste-treatment plant at Czestochowa is used as fuel to drive the generating set composed of an electric generator and a piston diesel engine adapted to operation with the fermentation gas. The adaption involved the use of a classical car ignition installation instead of the injection pumps and injector. The gas contains approximately CH/sub 4/ 60, CO/sub 2/ 32, N 5, and H 3 volume%.

  8. The effect of cleanliness control during installation work on the amount of accumulated dust in ducts of new HVAC installations.

    Science.gov (United States)

    Holopainen, R; Tuomainen, M; Asikainen, V; Pasanen, P; Säteri, J; Seppänen, O

    2002-09-01

    The aim of this study was to evaluate the amount of dust in supply air ducts in recently installed ventilation systems. The samples for the determination of dust accumulation were collected from supply air ducts in 18 new buildings that have been constructed according to two different cleanliness control levels classified as category P1 (low oil residues and protected against contaminations) and category P2, as defined in the Classification of Indoor Climate, Construction and Building Materials. In the ducts installed according to the requirements of cleanliness category P1 the mean amount of accumulated dust was 0.9 g/m2 (0.4-2.9 g/m2), and in the ducts installed according to the cleanliness category P2 it was 2.3 g/m2 (1.2-4.9 g/m2). A significant difference was found in the mean amounts of dust between ducts of categories P1 and P2 (P < 0.008). The cleanliness control procedure in category P1 proved to be a useful and effective tool for preventing dust accumulation in new air ducts during the construction process. Additionally, the ducts without residual oil had lower amounts of accumulated dust indicating that the demand for oil free components in the cleanliness classification is reasonable.

  9. Department of the Army Installation Restoration Program

    International Nuclear Information System (INIS)

    Anderson, A.W.

    1988-01-01

    The Army's Installation Restoration Program (IRP) was established in 1975 in response to regulatory action at several installations where past disposal practices had caused contamination of streams and groundwater. The need to decontaminate excess Army-owned real estate also was considered in early IRP activities. A variety of site types have been discovered on Army installations. The major site types evaluated to date include: contaminated soil areas, landfills, lagoons, buildings, burning grounds, sumps, pits, storage tanks, sewage treatment plants, storage pads, industrial wastewater treatment plants, and salvage yards. Twenty Army installations have been proposed for or listed on the National Priorities List (NPL). The need for taking action at hazardous waste sites, however, is based on threats they pose to human health, welfare or the environment. Sites do not have to be on the SPL in order to be cleaned up through IRP activities. All of the sites that caused Army installations to be proposed for the NPL are being evaluated and cleaned up. In addition, all Army properties have been or will be assessed and where needed they will be addressed by the IRP

  10. Natural gas cost for evaluating energy resource opportunities at Fort Stewart

    Energy Technology Data Exchange (ETDEWEB)

    Stucky, D.J.; Shankle, S.A.

    1993-01-01

    Ft. Stewart, a United States Army Forces Command (FORSCOM) installation located near Hinesville, Georgia, is currently undergoing an evaluation of its energy usage, which is being performed by Pacific Northwest Laboratory. In order to examine the energy resource opportunities (EROs) at Ft. Stewart, marginal fuel costs must be calculated. The marginal, or avoided, cost of gas service is used in conjunction with the estimated energy savings of an ERO to calculate the dollar value of those savings. In the case of natural gas, the costing becomes more complicated due to the installation of a propane-air mixing station. The propane-air station is being built under a shared energy savings (SES) contract. The building of a propane-air station allows Ft. Stewart to purchase natural gas from their local utility at an interruptible rate, which is lower than the rate for contracting natural gas on a firm basis. The propane-air station will also provide Ft. Stewart with fuel in the event that the natural gas supply is curtailed. While the propane-air station does not affect the actual cost of natural gas, it does affect the cost of services provided by gas. Because the propane-air station and the SES contract affect the cost of gas service, they must be included in the analysis. Our analysis indicates a marginal cost of gas service of 30.0 cents per therm, assuming a total propane usage by the mixing station of 42,278 gallons (38,600 therms) annually. Because the amount of propane that may be required in the event of a curtailment is small relative to the total service requirement, variations in the actual amount should not significantly affect the cost per therm.

  11. Natural gas cost for evaluating energy resource opportunities at Fort Stewart

    International Nuclear Information System (INIS)

    Stucky, D.J.; Shankle, S.A.

    1993-01-01

    Ft. Stewart, a United States Army Forces Command (FORSCOM) installation located near Hinesville, Georgia, is currently undergoing an evaluation of its energy usage, which is being performed by Pacific Northwest Laboratory. In order to examine the energy resource opportunities (EROs) at Ft. Stewart, marginal fuel costs must be calculated. The marginal, or avoided, cost of gas service is used in conjunction with the estimated energy savings of an ERO to calculate the dollar value of those savings. In the case of natural gas, the costing becomes more complicated due to the installation of a propane-air mixing station. The propane-air station is being built under a shared energy savings (SES) contract. The building of a propane-air station allows Ft. Stewart to purchase natural gas from their local utility at an interruptible rate, which is lower than the rate for contracting natural gas on a firm basis. The propane-air station will also provide Ft. Stewart with fuel in the event that the natural gas supply is curtailed. While the propane-air station does not affect the actual cost of natural gas, it does affect the cost of services provided by gas. Because the propane-air station and the SES contract affect the cost of gas service, they must be included in the analysis. Our analysis indicates a marginal cost of gas service of 30.0 cents per therm, assuming a total propane usage by the mixing station of 42,278 gallons (38,600 therms) annually. Because the amount of propane that may be required in the event of a curtailment is small relative to the total service requirement, variations in the actual amount should not significantly affect the cost per therm

  12. Assessment of technological solutions for removal of radium discharged to sea from offshore oil and gas installations

    Energy Technology Data Exchange (ETDEWEB)

    Eriksen, Dag Oeistein [Primus.inter.pares AS, Kongsberggata 20, NO-0468 Oslo (Norway); Hylland, Ketil [University of Oslo (Norway); Andersen, Knut Inge [Statoil ASA (Norway); Sidhu, Rajdeep Singh [Institute for Energy Technology - IFE (Norway)

    2014-07-01

    On the Norwegian sector of the North-Sea the oil- and gas-producing fields Troll B and C are the main contributors to radium discharged to the sea (190 GBq/a {sup 226}Ra and 150 GBq/a {sup 228}Ra). Thus, to observe effects caused by the emission of radioactivity and to consider remedial action one should focus on these two installations. Both installations are now operated by Statoil. In a previous comprehensive study of the speciation of discharged radium the conclusion was that it is impossible to detect any effect from radiation doses. The incremental doses due to the emissions were found to be in the nSv-range. The study covered precipitation by sulfate in the sea water, absorption on organic and inorganic materials, uptake in cod eggs and in juvenile cod, effect on sediment living organisms, background levels of pelagic fish and in sediments, and modeling of the distribution in the water column as well the distribution along the coastal stream. Despite the lack of radiation effects, an assessment of possible technological solution for removal of the radium has been undertaken. Such methods must meet the severe requirements imposed by the oil recovery process at Troll B and C: High produced water rates (>1000 m{sup 3}/h), high salinity and content of water soluble carboxylic acids originating from the crude oil, in addition to a relatively high content of barium (3 550 tonnes/a). For implementation on an offshore installation the footprint and weight of the equipment would have to be as low as possible. It is also imperative that the radiation doses to operators are as low as possible. This puts strict requirements on the shielding of the absorbents accumulating {sup 226}Ra and {sup 228}Ra. No commercially available methods were identified, but one new conceptual method based on absorption of radium on barite has been proposed. Barite is also a good shielding material. Tests performed at Institute for Energy Technology show, however, that the kinetics of the

  13. Edificio project: A neuro-fuzzy approach to building energy management systems

    NARCIS (Netherlands)

    Galata, A.; Bakker, L.G.; Morel, N.; Michel, J.B.; Karki, S.; Joergl, H.P.; Franceschini, A.; Martinez, A.

    1998-01-01

    It is well known that building installations for indoor climate control, consume a substantial part of the total energy consumption and that at present these installations use much more energy than required due to inadequate settings and poor control and management strategies. European building

  14. Energy use and environmental impact of new residential buildings

    Energy Technology Data Exchange (ETDEWEB)

    Adalberth, Karin

    2000-01-01

    The objective of this thesis is to investigate the energy use and environmental impact of residential buildings. Seven authentic buildings built in the 1990s in Sweden are investigated. They are analysed according to energy use and environmental impact during their life cycle: manufacture of building materials, transport of building materials and components to the building site, erection to a building, occupancy, maintenance and renovation, and finally demolition and removal of debris. Results show that approx. 85 % of the total estimated energy use during the life cycle is used during the occupation phase. The energy used to manufacture building and installation materials constitutes approx. 15 % of the total energy use. 70-90 % of the total environmental impact arises during the occupation phase, while the manufacture of construction and installation materials constitutes 10-20 %. In conclusion, the energy use and environmental impact during the occupation phase make up a majority of the total. At the end of the thesis, a tool is presented which helps designers and clients predict the energy use during the occupation phase for a future multi-family building before any constructional or installation drawings are made. In this way, different thermal properties may be elaborated in order to receive an energy-efficient and environmentally adapted dwelling.

  15. Historical Consumption of Heating Natural Gas and Thermal Monitoring of a Multifamily High-Rise Building in a Temperate/Cold Climate in Argentina

    Directory of Open Access Journals (Sweden)

    Celina Filippín

    2012-12-01

    Full Text Available This paper analyzes the historical consumption of natural gas in a multifamily high-rise building and the monitored winter thermal behavior of an apartment sample. The building is located in the center of Argentina (latitude: 36º27’S; longitude: 64º27’W, where the climate is a cold temperate with an absolute minimum temperature that may reach −10 °C. The building has two blocks, North and South. The building’s annual gas consumption and its variability between 1996 and 2008 are shown. The South block consumed 78% more gas, a situation expected due to lower solar resource availability and greater vulnerability regarding strong and cold SW winds. Indoor temperatures monitored during 2009 in four apartments are described. The outdoor minimum temperature reached −5 °C, with solar irradiance around 500 W/m2 at midday. Results showed that the average indoor temperatures were 20.1, 20.6, 24.0 and 22.1 °C. The highest consumption value corresponded to the apartment exposed to SW cold winds. Compared to the rest of the building, the apartment on the top floor consumes 59% more energy than the average for the gas consumed throughout the year. The authors assume that the energy potentials of intervention are different, and not necessarily all the apartments should have the same technological response.

  16. Installation for gas purification and gas mixture preparation

    International Nuclear Information System (INIS)

    Ciortea, Constantin; Dumitrescu, Ioana; Armeanu, Adrian

    2002-01-01

    The Gas Production Division of ICSI at Rm. Valcea developed advanced facilities for purification of hydrogen, nitrogen, methane gases, etc, with concentrations up to 99.999 % vol. Pure and ultrapure gases are used for analytical purposes in food industry, biology, medicine, research laboratories, chemical and metallurgical industries. In the frame of ICSI the purified gases are used for preparation of usual and special mixtures of gases as for instance for production of Ar + CO 2 , Ar + CH 4 , Ar + H 2 , Ar + N 2 , N 2 + CO 2 , N 2 + O 2 etc. These mixtures are required in diverse sectors of chemical, electrical, machine and food industry, in nuclear power plants for monitoring, in laboratories of equipment calibrations, etc. (authors)

  17. Integration of PV modules in existing Romanian buildings from rural areas

    Energy Technology Data Exchange (ETDEWEB)

    Fara, S.; Finta, D. [IPA SA Research Development, Engineering and Manufacturing for Automation Equipment and Systems, Bucharest (Romania); Fara, L.; Comaneci, D. [Polytechnic Univ. of Bucharest (Romania); Dabija, A.M. [Univ. of Architecture and Urbanism Ion Mincu, Bucharest (Romania); Tulcan-Paulescu, E. [West Univ. of Timisoara, Timisoara (Romania)

    2010-07-01

    Romania has launched a national research project to promote the use of distributed solar architecture and the use of BIPV systems. These systems include solar tunnels and active solar photovoltaic (PV) systems installed on the roofs and facades of buildings in rural areas. In contrast to other EU states, Romania does not have a photovoltaic building construction branch. The number of isolated cases are insufficient to identify a starting point regarding the PV market in the building industry. The main objective of the project is to demonstrate the efficiency of integrating various PV elements in buildings from rural areas, to test them and to make them known so that they can be used on a large scale. This will be accomplished by installing new products on 2 buildings in Bucharest and in 1 building in Timisoara. The PV modules will be integrated with the architecture. One of the buildings will be a historical building while the other 2 will be new buildings with different typologies. The installed power for each building will be of about 1.000 Wp, including some technologies with PV modules.

  18. Evaluation of energy efficiency efforts of oil and gas offshore processing

    DEFF Research Database (Denmark)

    Nguyen, Tuong-Van; Voldsund, Mari; Breuhaus, Peter

    2015-01-01

    the energy performance of these facilities, by decreasing the power and heating requirements and designing more efficient processes. Several technologies that have been proposed are to (i) promote energy integration within the oil and gas processing plant, (ii) add an additional pressure extraction level......, (iii) implement multiphase expanders, and (iv) install a waste heat recovery system. The present work builds on two case studies located in the North and Norwegian Seas, which differ by the type of oil processed, operating conditions and strategies. The findings suggest that no generic improvement can...

  19. Decree of the 6 May 2017 defining the conditions of additional remuneration of electricity produced by electricity production installations using wind mechanical energy with a maximum of 6 wind turbines. Decree of the 9 May 2014 defining purchase and additional remuneration conditions for the electricity produced by installations using mainly biogas produced by methanization of matters resulting from urban or industrial waste water treatment. Decree of the 9 May 2017 defining purchase conditions for electricity produced by installations implanted on building and using photovoltaic solar energy, with an installed power less than or equal to 100 kilowatts as those concerned at the 3. of the article D.314-15 of the Code of Energy, and located in continental metropolitan territory

    International Nuclear Information System (INIS)

    Royal, Segolene; Sapin, Michel

    2017-01-01

    This document gathers three legal texts which respectively define and eventually give elements and methods of calculation of conditions of additional remuneration or purchase of electricity produced by limited wind energy installations, by biogas-based electricity production installations, and by photovoltaic installations mounted on buildings

  20. A techno-economic assessment of grid connected photovoltaic system for hospital building in Malaysia

    Science.gov (United States)

    Mat Isa, Normazlina; Tan, Chee Wei; Yatim, AHM

    2017-07-01

    Conventionally, electricity in hospital building are supplied by the utility grid which uses mix fuel including coal and gas. Due to enhancement in renewable technology, many building shall moving forward to install their own PV panel along with the grid to employ the advantages of the renewable energy. This paper present an analysis of grid connected photovoltaic (GCPV) system for hospital building in Malaysia. A discussion is emphasized on the economic analysis based on Levelized Cost of Energy (LCOE) and total Net Present Post (TNPC) in regards with the annual interest rate. The analysis is performed using Hybrid Optimization Model for Electric Renewables (HOMER) software which give optimization and sensitivity analysis result. An optimization result followed by the sensitivity analysis also being discuss in this article thus the impact of the grid connected PV system has be evaluated. In addition, the benefit from Net Metering (NeM) mechanism also discussed.

  1. Review of vibration effect during piling installation to adjacent structure

    Science.gov (United States)

    Rahman, Nurul Aishah Abd; Musir, Adhilla Ainun; Dahalan, Nurol Huda; Ghani, Abdul Naser Abdul; Khalil, Muhamad Kasimi Abd

    2017-12-01

    Basically, many major structures across the world such as towers, high rise building, houses and bridges utilize pile as a support material. The use of pile is important to strengthen the structures. However, this has led to another problem to the nearest surrounding structures resulted from pile driving. As part of a construction work, unavoidable pile driving activity generates a vibration towards the surrounding structures if uncontrolled may cause damage to the adjacent structure. As the current construction works are frequently located in urban areas where the distance between the nearest building structures is not far, vibration may cause damage to nearby structures. Knowing which part of the building that is mostly affected by various vibration patterns from the impact of pile driving is crucial. Thus, it is very important to predict the impact of vibration during piling installation work. This paper reviews the vibrations generated by piling activity toward surrounding structures in terms sources of vibration, impact of piling installation, pile-soil interaction, and factors affecting the vibration impact of building as well as to study the parameters involved in vibration generation during piling works.

  2. New method and installation for rapid determination of radon diffusion coefficient in various materials

    International Nuclear Information System (INIS)

    Tsapalov, Andrey; Gulabyants, Loren; Livshits, Mihail; Kovler, Konstantin

    2014-01-01

    The mathematical apparatus and the experimental installation for the rapid determination of radon diffusion coefficient in various materials are developed. The single test lasts not longer than 18 h and allows testing numerous materials, such as gaseous and liquid media, as well as soil, concrete and radon-proof membranes, in which diffusion coefficient of radon may vary in an extremely wide range, from 1·10 −12 to 5·10 −5 m 2 /s. The uncertainty of radon diffusion coefficient estimation depends on the permeability of the sample and varies from about 5% (for the most permeable materials) to 40% (for less permeable materials, such as radon-proof membranes). - Highlights: • The new method and installation for determination of radon diffusion coefficient D are developed. • The measured D-values vary in an extremely wide range, from 5×10 -5 to 1×10 -12 m 2 /s. • The materials include water, air, soil, building materials and radon-proof membranes. • The duration of the single test does not exceed 18 hours. • The measurement uncertainty varies from 5% (in permeable materials) to 40% (in radon gas barriers)

  3. Integration of fuel cells into residential buildings

    International Nuclear Information System (INIS)

    Bell, J.M.; Entchev, E.; Gusdorf, J.; Szadkowski, F.; Swinton, M.; Kalbfleisch, W.; Marchand, R.

    2004-01-01

    Integration of small combined heat and power systems (CHP) into residential buildings is challenging as the loads are small, the load diversity is limited and there are a number of unresolved issues concerning sizing, control, peak loads, emergency operation, grid connection and export, etc. Natural Resources Canada has undertaken an initiative to investigate and develop techniques for the integration of small CHP systems into residential buildings using a highly instrumented house modified to allow quick installation and thorough monitoring of CHP integration techniques as well determining the performance of the CHP systems themselves when operating in a house. The first CHP system installed was a Stirling engine residential CHP system. It was used to examine the completeness of the CHP modifications to the house, to evaluate various building integration techniques and to measure the performance of the CHP system itself. The testing demonstrated the modified house to be an excellent facility for the development of CHP building integration techniques and the testing of residential CHP systems. The Stirling engine CHP system was found to operate well and produce meaningful input to the house. A second system (residential fuel cell) is presently being installed and building integration techniques and the performance of the fuel cell will be tested over the coming year. (author)

  4. Energy conservation according to the building codes of the National Board of Housing, Building and Planning; Energihushaallning enligt Boverkets byggregler

    Energy Technology Data Exchange (ETDEWEB)

    2009-10-15

    To comply with international and national targets for energy use, the National Board has adopted rules setting the levels to be met in order to conserve energy in buildings. The rules for buildings are shown in Boverkets building regulations (BBR). The BBR lists comprehensive requirements in order to ensure that a building must not use more than a certain number of kilowatt hours per square meter and year. There are more detailed requirements for thermal insulation, heating, cooling and air conditioning installations, efficient use of electricity and installation of metering systems for monitoring of building energy. The latest version of the BBR came into force on February 1, 2009 and has more stringent requirements for the buildings heated by electricity or comfort cooling powered by electricity. This handbook presents comments and answers to questions about the new rules for energy conservation. It replaces our previous handbook 'Thermal calculations'

  5. Mandatory reporting of greenhouse gas emissions from buildings: Stakeholders’ opinions in Hong Kong

    International Nuclear Information System (INIS)

    Lai, Joseph H.K.

    2014-01-01

    Mandatory reporting of greenhouse gas (GHG) emissions, which is intended to help combat global warming, has been increasingly implemented across the world. For buildings in Hong Kong, however, GHG reporting remains entirely voluntary even though the government has issued a set of guidelines to facilitate building owners and managers to quantify GHG emissions from buildings. Aimed at understanding stakeholders’ opinions on whether, and to what extent, the GHG reporting should be made mandatory, a study involving a questionnaire survey was carried out. Analysis of the opinions revealed that the majority supported making the reporting mandatory for office, hotel/hostel, and industrial buildings. Generally more support was received from those who were highly experienced, employees of non-government public organisations, academics/researchers, or qualified carbon/energy auditors. Their agreement on requiring reporting of activities under scopes 1 and 2 of the GHG Protocol was stronger than that for the scope 3 activities. Reporting of paper waste disposal attracted the weakest support. The reasons for not supporting the mandatory policy, including resource constraint and financial and knowledge barriers that confront the stakeholders, were identified. The findings of this study serve as reference for energy policy makers. - Highlights: • Majority supported mandatory reporting for office and hotel/hostel buildings. • More support was given for reporting of scopes 1 and 2 of the GHG Protocol. • Reporting for paper waste disposal received the weakest support. • Main hurdles were resource constraint and financial and knowledge barriers

  6. FY 1990 report on the results of the development of the entrained bed coal gasification power plant. Part 3. Fabrication/installation of pilot plant (Fabrication/installation drawings and fabrication/installation pictures - 2/2); 1990 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 3. Pilot plant seisaku suetsuke hen (Seisaku suetsukezu oyobi seisaku suetsuke shashin) (2/2)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-03-01

    For the purpose of establishing the technology of the integrated coal gasification combined cycle power generation, the fabrication, installation work, etc. were conducted of a 200t/d entrained bed coal gasification pilot plant, and fabrication/installation drawings and fabrication/installation pictures were summarized. In fabrication/installation drawings, drawings of the following were included: actual-pressure/actual-size combustor test equipment (structural drawing of exhaust temperature reducing device, structural drawing of hot air device, system diagram of piping, etc.), safety environmental equipment (total system diagram, layout of electric room equipment, layout of control equipment room, etc.), total control system (structural drawing of the total control system, front view of auxiliary panel of safety environment equipment, etc.), 66kV/6.9kV indoor switching station facilities (layout of equipment of indoor switching station facilities, outline drawing of the main transformer, outline drawing of gas circuit breaker, etc.), common facilities (total layout, diagram of the nitrogen gas pipe system, system diagram of utility equipment, etc.) In pictures of fabrication/installation, pictures of the following were included: state of the construction work, gasifier equipment, gas refining facilities, gas turbine facilities, actual-pressure/actual-size combustor test equipment, safety environmental equipment, total control system, 66kV/6.9kV indoor switching station facilities, common facilities. (NEDO)

  7. Demonstrate Energy Component of the Installation Master Plan Using Net Zero Installation Virtual Testbed

    Science.gov (United States)

    2015-09-01

    compliant GIS, usually obtained from the installation itself. NZP also includes an appropriate weather file for the location selected, using the closest...such as solar photovoltaics, solar-thermal, wind energy, biomass (wood chips, etc.), biogas , or synthetic gas need to be considered as part of the mix...have better information. In some cases, such as photovoltaics, users can obtain data from an online system and enter it into NZP. In this case, users

  8. Technological features of installation of transformable low-rise buildings from sandwich panels

    Directory of Open Access Journals (Sweden)

    Pleshivtsev Aleksandr Aleksandrovich

    2018-04-01

    Full Text Available Subject of research: organizational and technological solutions are considered in the construction of transformable low-rise residential buildings using sandwich panels. Aims: rational choice of organizational and technological solutions for the rhythmic construction of the underground and above-ground part of the transformable low-rise buildings in order to reduce labor costs and construction time. Materials and methods: methods of computer modeling of the technological processes are used to determine the duration of the construction of the low-rise buildings. Results: rational methods for erecting a complex of transformable low-rise buildings are defined, parameters of technological processes are established, an analysis of technological operations is provided for the construction of transformable low-rise residential buildings using sandwich panels. Conclusions: now organizational and technological solutions for the construction of transformable low-rise residential buildings with the use of sandwich panels reduce labour costs, increase the construction pace and as well as the using of improved technological processes in the construction of such buildings leads to a reduction in construction time.

  9. Risks in the transport and storage of liquefied natural gas. Sub-project 5-2: Investigation into building damage

    Science.gov (United States)

    Gouwens, C.; Dragosavic, M.

    The large reserves and increasing use of natural gas as a source of energy have resulted in its storage and transport becoming an urgent problem. Since a liquid of the same mass occupies only a fraction of the volume of a gas, it is economical to store natural gas as a liquid. Liquefied natural gas is stored in insulated tanks and also carried by ship at a temperature of -160 C to 170 C. If a serious accident allows the LNG to escape, a gas cloud forms. The results of a possible explosion from such a gas cloud are studied. The development of a leak, escape and evaporation, size and propagation of the gas cloud, the explosive pressures to be expected and the results on the environment are investigated. Damage to buildings is examined making use of the preliminary conclusions of the other sub-projects and especially the explosive pressures.

  10. Study on installation of the submersible mixer

    International Nuclear Information System (INIS)

    Tian, F; Shi, W D; He, X H; Xu, Y H; Jiang, H

    2013-01-01

    Study on installation of the submersible mixer for sewage treatment has been limited. In this article, large-scale computational fluid dynamics software FLUENT6.3 was adopted. ICEM software was used to build an unstructured grid of sewage treatment pool. After that, the sewage treatment pool was numerically simulated by dynamic coordinate system technology and RNG k-ε turbulent model and PIOS algorithm. Agitation pools on four different installation location cases were simulated respectively, and the external characteristic of the submersible mixer and the velocity cloud of the axial section were respectively comparatively analyzed. The best stirring effect can be reached by the installation location of case C, which is near the bottom of the pool 600 mm and blade distance the bottom at least for 200 mm wide and wide edge and narrow edge distance by 4:3. The conclusion can guide the engineering practice

  11. IMCOM LonWorks (registered trademark) Building Automation Systems Implementation Strategy

    National Research Council Canada - National Science Library

    Schwenk, David M; Bush, Joseph; Hughes, Lucie M; Briggs, Stephen; White, Will

    2008-01-01

    Army Installations often expand their use of digital control systems for heating, ventilating, and air conditioning and other mechanical and electrical building systems on a building-by-building basis...

  12. AWAKE starts the equipment installation phase

    CERN Multimedia

    Antonella Del Rosso

    2015-01-01

    AWAKE is the proof-of-principle experiment whose aim is to use protons to generate powerful wakefields to accelerate an electron beam. With accelerator gradients hundreds of times higher than those used in current systems, this technique could revolutionise the field of particle acceleration. Installed in the tunnel previously used by the CNGS facility, AWAKE is completing the service installation phase and will receive the plasma cell in the coming months.   The AWAKE proton line with all the magnets installed. (Image: AWAKE collaboration.) AWAKE is the world’s first proton-driven plasma wakefield acceleration experiment. In AWAKE, a beam of protons from the SPS will be travelling through a plasma cell and this will generate a wakefield that, in turn, will accelerate an electron beam. A laser will ionise the gas in the plasma cell and seed the self-modulation instability that will trigger the wakefield in the plasma. The project aims to prove that the plasma wakefield can be driv...

  13. Method of making an aero-derivative gas turbine engine

    Science.gov (United States)

    Wiebe, David J.

    2018-02-06

    A method of making an aero-derivative gas turbine engine (100) is provided. A combustor outer casing (68) is removed from an existing aero gas turbine engine (60). An annular combustor (84) is removed from the existing aero gas turbine engine. A first row of turbine vanes (38) is removed from the existing aero gas turbine engine. A can annular combustor assembly (122) is installed within the existing aero gas turbine engine. The can annular combustor assembly is configured to accelerate and orient combustion gasses directly onto a first row of turbine blades of the existing aero gas turbine engine. A can annular combustor assembly outer casing (108) is installed to produce the aero-derivative gas turbine engine (100). The can annular combustor assembly is installed within an axial span (85) of the existing aero gas turbine engine vacated by the annular combustor and the first row of turbine vanes.

  14. 305 Building Cold Test Facility Management Plan

    International Nuclear Information System (INIS)

    Whitehurst, R.

    1994-01-01

    This document provides direction for the conduct of business in Building 305 for cold testing tools and equipment. The Cold Test Facility represents a small portion of the overall building, and as such, the work instructions already implemented in the 305 Building will be utilized. Specific to the Cold Test there are three phases for the tools and equipment as follows: 1. Development and feature tests of sludge/fuel characterization equipment, fuel containerization equipment, and sludge containerization equipment to be used in K-Basin. 2. Functional and acceptance tests of all like equipment to be installed and operated in K-Basin. 3. Training and qualification of K-Basin Operators on equipment to be installed and operated in the Basin

  15. Seismic Response and Performance Evaluation of Self-Centering LRB Isolators Installed on the CBF Building under NF Ground Motions

    Directory of Open Access Journals (Sweden)

    Junwon Seo

    2016-01-01

    Full Text Available This paper mainly treats the seismic behavior of lead-rubber bearing (LRB isolation systems with superealstic shape memory alloy (SMA bending bars functioning as damper and self-centering devices. The conventional LRB isolators that are usually installed at the column bases supply extra flexibility to the centrically braced frame (CBF building with a view to elongate its vibration period, and thus make a contribution to mitigating seismic acceleration transferred from ground to structure. However, these base isolation systems are somehow susceptible to shear failure due to the lack of lateral resistance. In the construction site, they have been used to be integrated with displacement control dampers additionally withstanding lateral seismic forces. For this motivation, LRB isolation systems equipped with superelastic SMA bending bars, which possess not only excellent energy dissipation but also outstanding recentering capability, are proposed in this study. These reinforced and recentering LRB base isolators are modeled as nonlinear component springs, and then assigned into the bases of 2D frame models used for numerical simulation. Their seismic performance and capacity in the base-isolated frame building can be evaluated through nonlinear dynamic analyses conducted with historic ground motion data. After comparative study with analyses results, it is clearly shown that 2D frame models with proposed LRB isolators generally have smaller maximum displacements than those with conventional LRB isolators. Furthermore, the LRB isolation systems with superelastic SMA bending bars effectively reduce residual displacement as compared to those with steel bending bars because they provide more flexibility and recentering force to the entire building structure.

  16. Favourable environmental factors for shaft furnace installation for gas carbonitriding and hardening

    Energy Technology Data Exchange (ETDEWEB)

    Fuchs, H. (Solo-Industrieofenbau, Biehl-Bienne (Switzerland))

    In this lecture we do not primarily speak about the shaft furnace installation as one could think when reading the title - but about one quenching system - mounted over the shaft furnace installation. This quenching system permits a hardening in several mediums, without any formation of flames, smoke and vapour, and causes the surfaces of the pieces to be free of tinder. Moreover, the security for the work staff in the heat treatment shops are highly improved.

  17. 47 CFR 22.383 - In-building radiation systems.

    Science.gov (United States)

    2010-10-01

    ... MOBILE SERVICES Operational and Technical Requirements Technical Requirements § 22.383 In-building radiation systems. Licensees may install and operate in-building radiation systems without applying for... 47 Telecommunication 2 2010-10-01 2010-10-01 false In-building radiation systems. 22.383 Section...

  18. FEBEX. Investigations on gas generation, release and migration

    International Nuclear Information System (INIS)

    Jockwer, Norbert; Wieczorek, Klaus

    2008-06-01

    The FEBEX project is based on the Spanish reference concept for the disposal of radioactive waste in crystalline rock, which considers the emplacement of the canisters enclosing the conditioned waste surrounded by clay barriers constructed of high-compacted bentonite blocks in horizontal drifts /ENR 957. The whole project consisted of an experimental and a modelling part. The experimental part itself was divided into the in-situ test, a mock-up test performed at the CIEMAT laboratory, and various small-scale laboratory tests. In the modelling part it was expected to develop and validate the thermo-hydro-mechanical (THM) and the thermo-hydro-chemical (THC) processes for the performance assessment of the near-field behaviour. GRS was only involved in the in-situ test and some additional laboratory work with regard to gas generation, gas migration, and pore pressure build-up in the buffer constructed of high-compacted bentonite blocks around the electrical heaters simulating the waste containers. The following topics are covered: installation and dismantling of the heater pipes; methods of gas generation and release measurement, summary of results and discussion

  19. Solar heating and hot water system installed at Charlotte Memorial Hospital, Charlotte, North Carolina

    Science.gov (United States)

    1981-01-01

    Detailed information regarding the design and installation of a heating and hot water system in a commercial application is given. This information includes descriptions of system and building, design philosophy, control logic operation modes, design and installation drawing and a brief description of problems encountered and their solutions.

  20. Thermodynamic, ecological and economic aspects of the use of the gas turbine for heat supply to the stripping process in a supercritical CHP plant integrated with a carbon capture installation

    International Nuclear Information System (INIS)

    Bartela, Łukasz; Skorek-Osikowska, Anna; Kotowicz, Janusz

    2014-01-01

    Highlights: • Variants of integration of CHP plant with CCS and gas turbine unit were analyzed. • The simulations of operation of plants under changing load were realized. • Conditions of competitiveness for all solutions were identified. • Integration can be profitable if prices of allowance will reach values >60 €/MgCO 2 . - Abstract: This paper presents the results of thermodynamic and economic analyses for eight variants of a combined heat and power (CHP) plant fuelled with coal working under supercritical steam parameters and integrated with a CO 2 capture installation and a gas turbine system. The motivation behind using a gas turbine in the system was to generate steam to supply heat for the stripping process that occurs in the separation installation to regenerate the sorbent. Additional analyses were conducted for the reference case, a CHP unit in which the CO 2 separation process was not conducted, to enable an economic evaluation of the integration of a CHP unit with a CO 2 separation installation according to the variants proposed. The break-even price of electricity and avoided emission costs were used to evaluate the respective solutions. In this paper, the results of the sensitivity analysis of the economic evaluation indicators in terms of the change in the annual operation time, price of emission allowance and heat demand rate for the realization of the stripping process for all cases are presented

  1. Analysis of heat source selection for residential buildings in rural areas

    OpenAIRE

    Szul Tomasz

    2018-01-01

    The research aiming to check whether the output of currently installed boilers matches the use requirements together with estimation of their energy efficiency was carried out on a group of 84 single-family residential buildings located in rural areas. Heating and hot water energy needs were calculated for each building in order to determine the use requirements. This enabled verification whether the currently installed boilers match the actual use requirements in the buildings. Based on the ...

  2. Building the gas sector in Mexico

    International Nuclear Information System (INIS)

    Navarrete, J.E.

    1996-01-01

    Hydrocarbon reserves in Mexico, ranked 8th in the world, were discussed. On January 1, 1996, Mexico's hydrocarbon proven reserves were 62.1 billion barrels ( a decline of some 10 billion barrels since 1984). Of this 48.8 billion corresponded to crude oil and 13.3 billion to natural gas. Mexico's natural gas pipeline network includes 10,280 kilometres in transmission and 2,211 kilometres in distribution, concentrated along the Gulf of Mexico and in the central and northern regions of the country. A new regulatory framework for natural gas, passed in Congress in 1995, was outlined. The new amendments were designed to strengthen the natural gas industry through private investment in the storage, transportation and distribution of natural gas. Stages for third party access were identified. Increased North American regional integration by interconnections between Mexican, American and Canadian pipeline networks, and the effects of such integration on investments, were examined. figs

  3. Natural gas prime movers: A prime income opportunity?

    International Nuclear Information System (INIS)

    Katz, M.G.

    1997-01-01

    Although almost every factory, for example, uses compressed air to operate and control equipment--from power tools to packaging machinery--most air compressors are driven by electric motors. Similarly, although industry uses refrigeration for everything from freezing food to chilling warehouses to making chemicals and ice to operating skating rinks, natural gas powers only about 100 industrial refrigeration units in North America. But several factors are beginning to make natural gas more attractive as a prime mover. For one thing, the rising cost of electricity, with its demand or time-of-day and summer on-peak charges, has everyone looking for ways to cut their electric bills. At the same time, in the wake of deregulation of the nation's electric industry, customers can build on-site power plants that use natural gas to generate their own electricity, or have outside power suppliers or energy service companies (ESCOs) do it for them. Waste and exhaust heat, which can represent up to 60% of the total energy supplied from both engines and turbines, can be captured and used. Finally, growing concern over electric power outages has made natural gas more attractive for mission-critical operations, while new financing options let people buy and install natural gas prime movers more easily

  4. Magnetic resonance imaging: project planning and management of a superconductive M.R.I. installation

    International Nuclear Information System (INIS)

    Condon, P.M.; Robertson, A.R.

    1989-01-01

    The planning and installation of a Superconductive Magnetic Resonance Imaging installation at the Royal Adelaide Hospital, Adelaide, South Australia is described. Tender specification, assessment of offers via criteria weighted analysis of technical and economic factors and the final recommendation for a 1.0 Tesla unit are discussed. Building and installation considerations are noted including fringe field effects, magnetic shielding, radiofrequency shielding, cryogens, metallic screening and specific considerations in the Magnet room. 9 refs., 7 figs

  5. Electrica.l Insta.lla.tions in Multi-storey Buildings

    African Journals Online (AJOL)

    different diversity factors of the individual sections. However .... auxiliary drives for the heating system and ventila- tion, as well as ... For multi-storey buildings preference is generally given to ... Group p. f correction is expedient if large banks of.

  6. Analysis of heat source selection for residential buildings in rural areas

    Directory of Open Access Journals (Sweden)

    Szul Tomasz

    2018-01-01

    Full Text Available The research aiming to check whether the output of currently installed boilers matches the use requirements together with estimation of their energy efficiency was carried out on a group of 84 single-family residential buildings located in rural areas. Heating and hot water energy needs were calculated for each building in order to determine the use requirements. This enabled verification whether the currently installed boilers match the actual use requirements in the buildings. Based on the calculations it was determined that the designed average boiler output in the group of buildings subject to analysis is 15.7 kW, whereas the mean rated output capacity of boilers installed therein is 25.4 kW. On average, the output capacity of the installed boilers exceeds the use requirements for the buildings by 60%. To calculate the energy efficiency of boilers, the mean annual boiler output capacity use coefficient was determined. For boilers selected on the basis of standard calculations, the mean coefficient is 0.47. For boilers currently in use it is 0.31, less than the above figure. The above calculations show that if boilers were correctly selected in compliance to the building needs, then the average estimated seasonal efficiency of 65% would be feasible. However, in the current state the achievable efficiency is approx. 55%.

  7. Mapping the performance of wood-burning stoves by installations worldwide

    DEFF Research Database (Denmark)

    Luis Teles de Carvalho, Ricardo; Jensen, Ole Michael; Tarelho, Luis A. C.

    2016-01-01

    environmental health risk. Research stressed the need to increase the performance of conventional interplays between users, stoves and buildings. This scientific review aims to characterize the performance and environmental effects of 9 wood-burning stove categories by installations worldwide...

  8. New pre-heating system for natural gas pressure regulating stations

    International Nuclear Information System (INIS)

    Zullo, G.; Vertuani, C.; Borghesani, O.; Vignoli, F.

    1999-01-01

    Costs for running natural gas pressure regulating stations are mainly due to operation and maintenance of a natural gas preheating system, usually equipment with a hot water boiler or an armour-plated electric resistance immersed in a fluid. The article describe a system, considering a natural circulation boiler which uses steam/condensate (at 100 degrees C and 0,5 bar) as a thermal conductor, in thermodynamic balance and in absence of un condensable. This new boiler, already operating with satisfactory results in heating system for industrial buildings, does not require testing, notifications, periodical inspections by the competent authorities, constant monitoring by trained or patented staff. Besides, it allows easier installations procedures and running cost savings. The system, to be considered as static because it has no moving parts, is a good alternative to conventional forced hot water circulation or electric heating system [it

  9. Wind and Solar Energy Resource Assessment for Navy Installations in the Midwestern US

    Science.gov (United States)

    Darmenova, K.; Apling, D.; Higgins, G. J.; Carnes, J.; Smith, C.

    2012-12-01

    A stable supply of energy is critical for sustainable economic development and the ever-increasing demand for energy resources drives the need for alternative weather-driven renewable energy solutions such as solar and wind-generated power. Recognizing the importance of energy as a strategic resource, the Department of the Navy has focused on energy efficient solutions aiming to increase tactical and shore energy security and reduce greenhouse gas emissions. Implementing alternative energy solutions will alleviate the Navy installations demands on the National power grid, however transitioning to renewable energy sources is a complex multi-stage process that involves initial investment in resource assessment and feasibility of building solar and wind power systems in Navy's facilities. This study focuses on the wind and solar energy resource assessment for Navy installations in the Midwestern US. We use the dynamically downscaled datasets at 12 km resolution over the Continental US generated with the Weather Research and Forecasting (WRF) model to derive the wind climatology in terms of wind speed, direction, and wind power at 20 m above the surface for 65 Navy facilities. In addition, we derived the transmissivity of the atmosphere, diffuse radiation fraction, cloud cover and seasonal energy potential for a zenith facing surface with unobstructed horizon for each installation location based on the results of a broadband radiative transfer model and our cloud database based on 17-years of GOES data. Our analysis was incorporated in a GIS framework in combination with additional infrastructure data that enabled a synergistic resource assessment based on the combination of climatological and engineering factors.

  10. Ground source heat pumps versus high efficiency natural gas furnaces in Alberta

    Energy Technology Data Exchange (ETDEWEB)

    Shaw, J.

    2003-02-02

    For the past twenty years or so, the heating and cooling of numerous buildings in northern Europe has been accomplished using ground source heat pumps (GSHPs), while in North America they have been in use for approximately ten years. In the Prairies, natural gas furnaces dominate, while GSHP are more popular in eastern Canada. The author noted that natural gas furnaces have an efficiency of 80 per cent or less, while high efficiency natural gas (HENG) furnaces, more expensive, have an efficiency in the 90 per cent range. A brief outline of the principles behind GSHPs was provided. The Coefficient of Performance (COP) of GSHP reaches up to 500 per cent depending whether the unit is cooling or heating. The amount of heat produced by a heating system expressed as a percentage of the energy input required to operate the system is the definition used for the efficiency. In those cases where it is possible to amortize the initial costs, pay now or obtain a subsidy, the installation of GSHP is advantageous. Several factors affect the total cost of heating a building, such as the airtightness of the building and its insulation, the coldness of the climate, and the inside controlled temperature setting. The author then examined the cost of operating a GSHP versus a natural gas furnace. In most examples studied, the cost of operating a GSHP was less than the cost of operating a natural gas furnace. The Total Equivalent Warming Impact (TEWI) of GSHPs and HENG furnaces was examined. The author concluded that the cost of heating by GSHP in Alberta will be lower than the cost of heating by HENG which requires a separate air conditioning unit for the summer months, with additional improvements in efficiency and insulation. 7 refs., 4 tabs.

  11. Burnable gas concentration control device

    International Nuclear Information System (INIS)

    Goto, Hiroshi; Sanada, Takahiro; Kuboniwa, Takao.

    1980-01-01

    Purpose: To provide connecting ports by doubling nitrogen gas injection pipes thereby to secure lengthiness of the device only by providing one nitrogen gas generator. Constitution: Nitrogen gas injection pipes are provided in two lines separately, and attachable and detachable connecting ports for feeding nitrogen gas connectable to a movable type nitrogen gas supply installation for the purpose of backing up the nitrogen gas generator. (Yoshihara, H.)

  12. Solar system installation at Louisville, Kentucky (final report)

    Energy Technology Data Exchange (ETDEWEB)

    1978-08-07

    A contract was awarded in June 1976 for the installation of a solar space heating and domestic hot water system at 2400 Watteroon Trail, Louisville, Kentucky. The overall philosophy used was to install both a liquid and a hot air system retrofitted to the existing office and combined warehouse building. The 1080 sq ft office space is heated first and excess heat is dumped into the warehouse. The two systems offered a unique opportunity to measure the performance and compare results of both air and liquid at one site. The two systems are described in detail and information on the data acquisition system is included.

  13. Stimulation of sustainable installation. Initiatives in the market; Stimulering van duurzaam installeren. Initiatieven in de markt

    Energy Technology Data Exchange (ETDEWEB)

    Bijman, J.N.M. [Intechnium, Woerden (Netherlands)

    2000-04-01

    Sustainable construction of buildings is stimulated by the Dutch government, while it is one of the options to realize reduction of CO2 emission. It is not only a matter of applying sustainable building materials and thermal insulation, but also technical aspects of installations play a part, e.g. low temperature heating, solar energy, heat pumps, underground heat and cold storage, high-efficient ventilation, etc. However, it appears that for a large-scale application of those techniques there are still some barriers with respect to knowledge and acceptation of sustainable installations by the market. Next to stimulation by the Dutch government private enterprises develop initiatives in this direction. Two of those initiatives are discussed in this article: 'Wasco Groothandelsgroep Centrale Verwarming' (wholesale company for central heating systems ) in Twello, Netherlands, set up the Wasco Energy Centre, and 'Stichting Dubotechniek' (foundation for sustainable building technology) in Zaltbommel, Netherlands. Both initiatives concern information centers to show the performance of and provide information on sustainable installations.

  14. NRC new sustainable building

    International Nuclear Information System (INIS)

    Semczyszyn, D.

    2004-01-01

    'Full text:' The National Research Council Institute For Fuel Cell Innovation is relocating to a purpose-built 71,343 sq. Ft. (6598 sq. M) Research, Testing, Evaluation, and Industry Incubation Facility in the spring of 2006. The new facility will contain Hydrogen-ready laboratories, the existing relocated Hydrogen Safe Environmental Test Chamber, a hydrogen vehicle maintenance bay, a hydrogen vehicle refuelling station, and the following demonstration projects and features: 1. A Ground Source Heat Pump: This long-proven natural-source heating and cooling technology to provide climate control for the new IFCI's atrium and galleria. It is being designed by Keen Engineering of North Vancouver, BC. 2. 5 KW Solid Oxide Fuel Cell System: Fuelled by natural gas and in the future, from biomass, the fuel cell will also produce approximately 15 kW of waste heat, which will be captured and used to supply heat for the building. The Solid Oxide Fuel Cell will be supplied by Fuel Cell Technologies in Kingston, ON. 3. LEED Building certification: Attaining LEED 'green building' certification is considered an important complement to the plans for the new NRC-IFCI, because it will provide respected third-party verification of government's commitment to efficient building design and construction. Project architects Bunting Coady of Vancouver, BC believe the IFCI has strong potential to earn gold LEED certification. 4. Photovoltaic hydrogen source for back-up power fuel cell system: A photovoltaic array will capture energy from sunlight to power an electrolyzer that will produce and store hydrogen for a PEM fuel cell emergency backup power system. The electrolyzer will be provided by Hydrogenics of Mississauga, ON. Photovoltaics are being designed and installed by the British Columbia Institute of Technology. (author)

  15. Considerations about the Urucu-Manaus gas pipeline design; Consideracoes sobre o projeto do gasoduto Urucu-Manaus

    Energy Technology Data Exchange (ETDEWEB)

    Villela, Claudio Henrique Lobianco G.; Correia, Luiz de Carvalho Dias [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2005-07-01

    The main purpose of this job is to present the characteristics that influenced the elaboration of the Urucu-Manaus Gas Pipeline Project and the difference between this pipeline and other pipelines already installed on the Amazon region. In this project were emphasized the aspects related to the route definition, mapping technologies that had not been utilized in our pipeline projects, the crossing of vast flooded areas, requiring specific studies, as well the minimization of the environment impacts, in this case the existence of animal species present only in this region. Other differential factor was the Rio Negro crossing, where the pipeline will be installed in the riverbed. The know-how attained with this project consolidates ever so the activity of building pipelines in tropical forest regions. (author)

  16. Implementing Relative Ranking Evaluation Framework at Department of Energy (DOE) installations

    International Nuclear Information System (INIS)

    Sharma, S.K.; Williamson, D.; Treichel, L.C.; James, L.M.

    1996-01-01

    The US Department of Energy (DOE) Office of Environmental Restoration (EM-40) has developed the Relative Ranking Evaluation Framework (RREF) to help categorize release sites, facilities and buildings requiring restoration or decommissioning. Based on this framework, a computer tool, the Relative Rank Evaluation Program (RREP) has been developed to evaluate release sites, facilities and buildings, and to manage information pertaining to relative ranking evaluations. The relative ranking information is being used by both Headquarters and field project managers, and other environmental personnel responsible for planning, executing and evaluation environmental restoration activities at DOE installations. External stakeholders, such as representatives of federal and state regulatory agencies, local governments and communities in the vicinity of current and formerly used DOE installations may use this data to review proposed and planned activities

  17. Building America Case Study: Trade-Friendly Retrofit Insulated Panels for Existing Buildings, Albany, New York

    Energy Technology Data Exchange (ETDEWEB)

    2016-03-01

    This project evaluated the effectiveness and affordability of integrating retrofit insulated panels into a re-siding project. The Partnership for Home Innovation (PHI) teamed with New York State Energy Research and Development Authority (NYSERDA), the Albany Housing Authority (AHA), and the New York State Weatherization Assistance Program (WAP) administered by Albany Community Action Partnership to demonstrate an energy retrofit and siding upgrade on a two-story, seven unit, multifamily building in Albany New York (CZ 5). The project focused on accomplishing three goals - doubling the existing wall thermal resistance (from approximately R-13 to a weighted average of R-27), reduction of building air leakage, and completion of the retrofit within a budget where the additional cost for upgrading wall's thermal resistance is equal to the cost of the standard re-siding effort (i.e., the total cost of the energy efficient re-siding scope of work is not more than double the cost of the standard re-siding effort). Lessons learned from the project strongly indicate that the retrofit panel technology can be installed using common installation practices and with minimal training. Other lessons learned include limitation on the use of standard air sealing materials during cold weather installations and the need to develop better installation guidance for trades working with the level of tolerances that may be present in the existing structure. This technology demonstration showed that exterior retrofit panels provide a viable and reasonable option for the siding trades to increase market opportunities and achieve synergistic benefits for aesthetic upgrades to a building's exterior.

  18. Solar hot water system installed at Las Vegas, Nevada. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-01-01

    The solar hot water system installed at LaQuinta Motor Inn Inc., at Las Vegas, Nevada is described. The Inn is a three-story building with a flat roof for installation of the solar panels. The system consists of 1200 square feet of liquid flat plate collectors, a 2500 gallon insulated vertical steel storage tank, two heat exchangers and pumps and controls. The system was designed to supply approximately 74 percent of the total hot water load.

  19. Reliability of sprinkler systems. Exploration and analysis of data from nuclear and non-nuclear installations

    International Nuclear Information System (INIS)

    Roenty, V.; Keski-Rahkonen, O.; Hassinen, J.P.

    2004-12-01

    Sprinkler systems are an important part of fire safety of nuclear installations. As a part of effort to make fire-PSA of our utilities more quantitative a literature survey from open sources worldwide of available reliability data on sprinkler systems was carried out. Since the result of the survey was rather poor quantitatively, it was decided to mine available original Finnish nuclear and non-nuclear data, since nuclear power plants present a rather small device population. Sprinklers are becoming a key element for the fire safety in modern, open non-nuclear buildings. Therefore, the study included both nuclear power plants and non-nuclear buildings protected by sprinkler installations. Data needed for estimating of reliability of sprinkler systems were collected from available sources in Finnish nuclear and non-nuclear installations. Population sizes on sprinkler system installations and components therein as well as covered floor areas were counted individually from Finnish nuclear power plants. From non-nuclear installations corresponding data were estimated by counting relevant things from drawings of 102 buildings, and plotting from that sample needed probability distributions. The total populations of sprinkler systems and components were compiled based on available direct data and these distributions. From nuclear power plants electronic maintenance reports were obtained, observed failures and other reliability relevant data were selected, classified according to failure severity, and stored on spreadsheets for further analysis. A short summary of failures was made, which was hampered by a small sample size. From non-nuclear buildings inspection statistics from years 1985.1997 were surveyed, and observed failures were classified and stored on spreadsheets. Finally, a reliability model is proposed based on earlier formal work, and failure frequencies obtained by preliminary data analysis of this work. For a model utilising available information in the non

  20. Installation and Commissioning of the Helium Refrigeration System for the HANARO-CNS

    International Nuclear Information System (INIS)

    Choi, Jung Woon; Kim, Young Ki; Wu, Sang Ik; Son, Woo Jung

    2009-11-01

    The cold neutron source (CNS), which will be installed in the vertical CN hole of the reflector tank at HANARO, makes thermal neutrons to moderate into the cold neutrons with the ranges of 0.1 ∼ 10 meV passing through a moderator at about 22K. A moderator to produce cold neutrons is liquid hydrogen, which liquefies by the heat transfer with cryogenic helium flowing from the helium refrigeration system. For the maintenance of liquid hydrogen in the IPA, the CNS system is mainly consisted of the hydrogen system to supply the hydrogen to the IPA, the vacuum system to keep the cryogenic liquid hydrogen in the IPA, and the helium refrigeration system to liquefy the hydrogen gas. The helium refrigeration system can be divided into two sections: one is the helium compression part from the low pressure gas to the high pressure gas and the other is the helium expansion part from the high temperature gas and pressure to low temperature and pressure gas by the expansion turbine. The helium refrigeration system except the warm helium pipe and the helium buffer tank has been manufactured by Linde Kryotechnik, AG in Switzerland and installed in the research reactor hall, HANARO. Other components have been manufactured in the domestic company. This technical report deals with the issues, its solutions, and other particular points while the helium refrigeration system was installed at site, verified its performance, and conducted its commissioning along the reactor operation. Furthermore, the operation procedure of the helium refrigeration system is included in here for the normal operation of the CNS

  1. DOD low energy model installation program

    International Nuclear Information System (INIS)

    Fournier, D.F. Jr.

    1993-01-01

    The Model Low Energy Installation Program is a demonstration of an installation-wide, comprehensive energy conservation program that meets the Department of Defense (DoD) energy management goals of reducing energy usage and costs by at least 20%. It employs the required strategies for meeting these goals, quantifies the environmental compliance benefits resulting from energy conservation and serves as a prototype for DoD wide application. This project will develop both analysis tools and implementation procedures as well as demonstrate the effectiveness of a comprehensive, coordinated energy conservation program based on state-of-the-art technologies. A military installation is in reality a small to medium sized city. It generally has a complete utilities infrastructure including water supply and distribution, sewage collection and treatment, electrical supply and distribution, central heating and cooling plants with thermal distribution, and a natural gas distribution system. These utilities are quite extensive and actually consume about 10-15% of the energy on the facility not counting the energy going into the central plants

  2. Dauphin Island natural gas project

    Energy Technology Data Exchange (ETDEWEB)

    Layfield, R.P. (Arco International Oil and Gas Co., Plano, TX (United States)); Elser, K.L.; Ostler, R.H. (Arco Oil and Gas Co., Houston, TX (United States))

    1994-01-01

    Arco Oil and Gas Co. installed the Dauphin Island production facility in a fragile Alabama marine environment supporting important fisheries and tourist facilities. The authors used proactive communication with governmental agencies, area industry, and the public; innovative construction technologies; and unique platform design to minimize the environmental and aesthetic impacts and to develop an economically successful gas field. The innovative equipment used in the offshore pipeline installation is a model approach for solving certain turbidity problems. The project has received numerous environmental awards.

  3. Dauphin Island natural gas project

    International Nuclear Information System (INIS)

    Layfield, R.P.; Elser, K.L.; Ostler, R.H.

    1994-01-01

    Arco Oil and Gas Co. installed the Dauphin Island production facility in a fragile Alabama marine environment supporting important fisheries and tourist facilities. The authors used proactive communication with governmental agencies, area industry, and the public; innovative construction technologies; and unique platform design to minimize the environmental and aesthetic impacts and to develop an economically successful gas field. The innovative equipment used in the offshore pipeline installation is a model approach for solving certain turbidity problems. The project has received numerous environmental awards

  4. Seismic risk and safety of nuclear installations. A look at the Cadarache Centre

    International Nuclear Information System (INIS)

    Verrhiest-Leblanc, G.; Chevallier, A.

    2010-01-01

    After a brief recall of some important seismic events which occurred in the past in the south-eastern part of France, the authors indicate the nuclear installations present in this region. They outline the difference between requirements for a usual building and for basic nuclear installations. They indicate laws and regulations which are to be applied to these installations like to any hazardous industrial installation. They describe the seismic risk as it has been determined for the Cadarache area, and evoke the para-seismic design of new nuclear installations which are to be built in Cadarache and actions for a para-seismic reinforcement of existing constructions. Finally, they evoke organisational aspects (emergency plans) and the approach for a better information and transparency about the seismic risk

  5. Natural gas participation on brazilian demand supply of liquefied petroleum gas

    International Nuclear Information System (INIS)

    Freitas Rachid, L.B. de

    1991-01-01

    Natural Gas Liquids Production, Liquefied Petroleum Gas (LPG) among them, has undergone a continuous growth and technological development until the first half of the eighties. This paper presents the natural gas processing activity development in Brazil, in the last 20 years, and the increasing share of LPG produced from natural gas in the supply of LPG domestic market. Possibilities of achieving greater shares are discussed, based on economics of natural gas processing projects. Worldwide gas processing installed capacity and LPG pricing tendencies, and their influence in the construction of new Natural Gas Processing Units in Brazil, are also discussed. (author)

  6. Net Zero Energy Military Installations: A Guide to Assessment and Planning

    Energy Technology Data Exchange (ETDEWEB)

    Booth, S.; Barnett, J.; Burman, K.; Hambrick, J.; Westby, R.

    2010-08-01

    The U.S. Department of Defense (DoD) recognizes the strategic importance of energy to its mission, and is working to reduce energy consumption and enhance energy self-sufficiency by drawing on local clean energy sources. A joint initiative formed between DoD and the U.S. Department of Energy (DOE) in 2008 to address military energy use led to a task force to examine the potential for net zero energy military installations, which would produce as much energy on site as they consume in buildings, facilities, and fleet vehicles. This report presents an assessment and planning process to examine military installations for net zero energy potential. Net Zero Energy Installation Assessment (NZEIA) presents a systematic framework to analyze energy projects at installations while balancing other site priorities such as mission, cost, and security.

  7. Tipping points for carbon dioxide and air pollution benefits: an energy systems analysis of natural gas verses electric technologies in the U.S. buildings sector

    Science.gov (United States)

    Our analysis examines emission trade-offs between electricity and natural gas use in the buildings sector at the system level, including upstream emissions from the electric sector and natural gas mining emissions.

  8. Building automation and domotics. A special issue; Gebouwautomatisering en Domotica. Special

    Energy Technology Data Exchange (ETDEWEB)

    Becque, C.D. [ed.; Janssen, H.; Van Hulsen, E.J. [Getronics Gebouwautomatisering, Amsterdam (Netherlands); Westerhof, E. [Westermann Installaties, Leeuwarden (Netherlands); Bijman, J.N.M. [Afdeling Technologie, Intechnium, Woerden (Netherlands); Batavier, A.W.G. [Vakdiscipline Gebouwautomatisering, Technical Management, Amersfoort (Netherlands); Eshuis, B. [IPCO Engineering, Dordrecht (Netherlands); Harmsen, J.G. [Unica Regeltechniek, Zwolle (Netherlands); Van der Helm, R.Th.C.; Wortel, W.; Zeller, W. [Kropman, Rijswijk (Netherlands); Uythof, B.H. [Invenit, Domotica Platform Nederland, Amsterdam (Netherlands); Roemer, J.C. [ECN-DEGO, Petten (Netherlands); Koetsier, H.A. [HITECHnologies, IJsselstein (Netherlands)

    1999-12-01

    In 12 articles an overview is given of developments in the use of automation and domotics in different types of buildings. Previous specials on the same subject in this magazine were published in november 1989 and november 1995. Article 1 is on trends and developments in building automation and novelties in domotics. In the second article attention is paid to the necessary improvement of the project finalization for the indoor microclimate installation and the required automation. The third article deals with the use of digital control systems in the installation technology. In article four the activities in the municipality The Hague to save energy in municipal buildings are outlined. Already 100 building management systems of public schools are connected to a central computer. In the next three articles the design, installation and use of automated control and management systems in the new main office of the banking enterprise ABN AMRO in Amsterdam, Netherlands, In article eight the standardization of bus systems to integrate cables and equipment in building management systems is discussed. In the ninth article the subject is building automation by means of a Neuron chip-based Local Operating Network (LON), developed by the USA company Echelon. In article ten LON is also discussed, next to the software program InsiteView by means of which all the building installations and systems can be visualized via Internet. In the last two articles attention is paid to domotics: how to define this notion, its market, and whether the use of domotics saves energy or requires more energy.

  9. Guidelines for safety related telecommunications systems on normally unattended fixed offshore installations

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    Guidance is given on the design of telecommunications systems required for safety purposes on normally unattended offshore installations associated with oil and gas production on the United Kingdom continental shelf. The guidelines are mainly concerned with ensuring that: while the installation is unattended, its operation can be remotely monitored and controlled effectively to prevent the escalation of any abnormal situation; the installation can be safely approached when it is necessary to transfer personnel on board; persons on board, for example for inspection or maintenance activities, are safe. (UK)

  10. Distributed energy resources at naval base ventura county building 1512

    International Nuclear Information System (INIS)

    Bailey, Owen C.; Marnay, Chris

    2004-01-01

    This paper reports the findings of a preliminary assessment of the cost effectiveness of distributed energy resources at Naval Base Ventura County (NBVC) Building 1512. This study was conducted in response to the base's request for design assistance to the Federal Energy Management Program. Given the current tariff structure there are two main decisions facing NBVC: whether to install distributed energy resources (DER), or whether to continue the direct access energy supply contract. At the current effective rate, given assumptions about the performance and structure of building energy loads and available generating technology characteristics, the results of this study indicate that if the building installed a 600 kW DER system with absorption cooling and heat capabilities chosen by cost minimization, the energy cost savings would be about 14 percent, or $55,000 per year. However, under current conditions, this study also suggests that significant savings could be obtained if Building 1 512 changed from the direct access contract to a SCE TOU-8 (Southern California Edison time of use tariff number 8) rate without installing a DER system. At current SCE TOU-8 tariffs, the potential savings from installation of a DER system would be about 4 percent, or $15,000 per year

  11. The installations of the Amsterdam town hall annex music theatre. Het stadhuis/muziektheater te Amsterdam, zitten daar ookinstallaties in

    Energy Technology Data Exchange (ETDEWEB)

    Huijben, J.W.

    1989-10-01

    The following systems within the title building are discussed:installations to produce heat or cold energy; air treatment andventilation systems; high-voltage installations and energy conservationmeasures; low-voltage installations; transport systems and stageinstallations. In particular mechanical engineering, the electricalinstallations and the energy conservation measures are highlighted. 13figs.

  12. Gas transfer system

    International Nuclear Information System (INIS)

    Oberlin, J.C.; Frick, G.; Kempfer, C.; North, C.

    1988-09-01

    The state of work on the Vivitron gas transfer system and the system functions are summarized. The system has to: evacuate the Vivitron reservoir; transfer gas from storage tanks to the Vivitron; recirculate gas during operation; transfer gas from the Vivitron to storage tanks; and assure air input. The system is now being installed. Leak alarms are given by SF6 detectors, which set off a system of forced ventilation. Another system continuously monitors the amount of SF6 in the tanks [fr

  13. Distributed DC-UPS for energy smart buildings

    Energy Technology Data Exchange (ETDEWEB)

    Moreno-Munoz, A.; Pallares-Lopez, V.; Real-Calvo, R.J.; Gil-de-Castro, A. [Universidad de Cordoba, Area de Electronica, Dpto. Arquitectura de Computadores, Electronica y Tecnologia Electronica, Escuela Politecnica Superior, Campus de Rabanales, E-14071 Cordoba (Spain); De la Rosa, Juan Jose Gonzalez [Universidad de Cadiz, Area de Electronica, Dpto. ISA, TE y Electronica, Escuela Politecnica Superior Avda, Ramon Puyol, S/N, E-11202 Algeciras-Cadiz (Spain)

    2011-01-15

    Energy efficiency (EE) improvement is one of the most important targets to be achieved on every society as a whole and in buildings in particular. Energy Smart Building aims to accelerate the uptake of EE, healthy buildings that by integrating smart technology and solutions consume radically little resources while enhancing the quality of life. This paper addresses how uninterruptible power supply (UPS), particularly when configured in distributed DC mode, can become an Energy Efficient (EE) solution in high tech buildings, especially when integrated with complimentary Power Quality (PQ) measures. The paper is based upon PQ audits conducted at different IT-intensive modern building. Some of the mayor objectives of the PQ studies were: detecting the main involved disturbances by PQ monitoring, identifying the power disturbances root causes, characterizing the electromagnetic compatibility level of equipments and installation and providing guidelines for implementing energy-efficiency solutions. It was found that the main problems for the equipment installed were harmonics and voltage sag (dip). Finally, this paper demonstrates the impacts of generalized electronic devices on the PQ of the buildings and the implications on energy uses. (author)

  14. Liquid natural gas. Japan

    International Nuclear Information System (INIS)

    Van Kooij, E.

    1998-01-01

    An overview is given of the technical know-how and expertise in Japan with respect to the supply, transport, storage and use of LNG. First the overall energy supply in Japan is outlined. Next, the reasons for the use of LNG as an energy source in Japan are discussed. As an example of a typical LNG-installation in Japan the construction of the Himeji Terminal of Osaka Gas Company is described. Finally, attention is paid to the world's largest and modern below-surface LNG-tanks (capacity of 200,000 m 3 ), installed at the Negishi Terminal of Tokyo Gas Company

  15. Inauguration of the "Timeframe" Building 49

    CERN Multimedia

    Brice, Maximilien

    2017-01-01

    As you have probably seen, the corridor collage for Building 49 (the glass walkway between buildings 513 and 31) is finally being installed. It is one of the projects that was developed as part of the CERN IT Create event that took place over two days in March 2016 at IdeaSquare. The objective of this workshop was to brainstorm and work in teams (IT department people, specialists and experts of the ECO group, and external designers – Laura Couto Rosado and Nadezda Suvorova– linked to the Arts@CERN programme) to design and produce the first prototypes of an exhibit to enhance the experience of the public visitors to the CERN data centre building. Five projects were developed at this occasion (and presented at an IT technical forum): the ‘Timeframe’ one is the first one being finalised. More information about this project can be read in the attached document. The small inauguration of this installation will take place on 28/06/17 at 10:00 in front of the glass corridor (building 49). The ribbon will be ...

  16. Costs and Operating Dynamics of Integrating Distributed Energy Resources in Commercial and Industrial Buildings with Electric Vehicle Charging

    Science.gov (United States)

    Flores, Robert Joseph

    Growing concerns over greenhouse gas and pollutant emissions have increased the pressure to shift energy conversion paradigms from current forms to more sustainable methods, such as through the use of distributed energy resources (DER) at industrial and commercial buildings. This dissertation is concerned with the optimal design and dispatch of a DER system installed at an industrial or commercial building. An optimization model that accurately captures typical utility costs and the physical constraints of a combined cooling, heating, and power (CCHP) system is designed to size and operate a DER system at a building. The optimization model is then used with cooperative game theory to evaluate the financial performance of a CCHP investment. The CCHP model is then modified to include energy storage, solar powered generators, alternative fuel sources, carbon emission limits, and building interactions with public and fleet PEVs. Then, a separate plugin electric vehicle (PEV) refueling model is developed to determine the cost to operate a public Level 3 fast charging station. The CCHP design and dispatch results show the size of the building load and consistency of the thermal loads are critical to positive financial performance. While using the CCHP system to produce cooling can provide savings, heat production drives positive financial performance. When designing the DER system to reduce carbon emissions, the use of renewable fuels can allow for a gas turbine system with heat recovery to reduce carbon emissions for a large university by 67%. Further reductions require large photovoltaic installations coupled with energy storage or the ability to export electricity back to the grid if costs are to remain relatively low. When considering Level 3 fast charging equipment, demand charges at low PEV travel levels are sufficiently high to discourage adoption. Integration of the equipment can reduce demand charge costs only if the building maximum demand does not coincide

  17. Reconstruction of Low Pressure Gas Supply System

    Directory of Open Access Journals (Sweden)

    S. N. Osipov

    2013-01-01

    Full Text Available The current reconstruction of residential areas in large cities especially with the developed heat-supply systems from thermal power stations and reduction of heat consumption for heating due to higher thermal resistance of building enclosing structures requires new technical solutions in respect of gas-supply problems. While making reconstruction of a gas-supply system of the modernized or new buildings in the operating zone of one gas-distribution plant it is necessary to change hot water-supply systems from gas direct-flow water heaters to centralized heat-supply and free gas volumes are to be used for other needs or gas-supply of new buildings with the current external gas distribution network.Selection of additional gas-line sections and points of gas-supply systems pertaining to new and reconstructed buildings for their connection to the current distribution system of gas-supply is to be executed in accordance with the presented methodology.

  18. Energy efficiency to reduce residential electricity and natural gas use under climate change.

    Science.gov (United States)

    Reyna, Janet L; Chester, Mikhail V

    2017-05-15

    Climate change could significantly affect consumer demand for energy in buildings, as changing temperatures may alter heating and cooling loads. Warming climates could also lead to the increased adoption and use of cooling technologies in buildings. We assess residential electricity and natural gas demand in Los Angeles, California under multiple climate change projections and investigate the potential for energy efficiency to offset increased demand. We calibrate residential energy use against metered data, accounting for differences in building materials and appliances. Under temperature increases, we find that without policy intervention, residential electricity demand could increase by as much as 41-87% between 2020 and 2060. However, aggressive policies aimed at upgrading heating/cooling systems and appliances could result in electricity use increases as low as 28%, potentially avoiding the installation of new generation capacity. We therefore recommend aggressive energy efficiency, in combination with low-carbon generation sources, to offset projected increases in residential energy demand.

  19. ASSESSMENT OF INSTALLATION WATER QUALITY IN AN EDUCATIONAL BUILDING ON THE BASIS OF LEGIONELLA Sp. CONCENTRATION

    Directory of Open Access Journals (Sweden)

    Amelia Beata Staszowska

    2017-06-01

    Full Text Available Legionella are known as one of the dangerous water-borne pathogens, causing severe respiratory tract infections. The aim of this study was to assess the installation water quality in an educational building located in Lublin on the basis of Legionella sp. concentration and physicochemical parameters of cold and hot installation water. Samples (n=60 of cold and hot water were collected for testing from the 10 tapping points during three surveys over a period of five months. The test samples were analyzed for the basic physicochemical parameters of the water quality such as pH, electrical conductivity, temperature, hardness, alkalinity, the total carbon content, the concentration of nitrates, chlorides and sulphates. Additionally, the concentration of calcium, magnesium, iron, manganese and zinc were examined. The presence of Legionella in water samples was measured according the standard methods. The quality of the analyzed water did not raise objections and met the criteria of the Ordinance of the Polish Ministry of Health (2015, pos.1989. The only parameter which did not comply with applicable regulations was the temperature of the supply water and return hot water - it was lower than required. Bacteria of the genus Legionella were detected only in the hot water samples from series 1 when the rate of colonization reached the level of 80%. Among the positive samples, 2 contained less than 1000 CFU/100 ml, 4 samples contained 1x103 to 1x104 CFU/100 ml, and 2 samples contained more than 1x104 CFU/100 ml. The maximum number of CFU in a sample was 1.8x104/100 ml. The most dangerous serogroup L. pneumophila sg 1 was not detected in any of the positive isolated samples. All Legionella - positive samples belonged to L. pneumophila sg 2-14. These findings necessitated a corrective action in the form of thermal disinfection system and its maintenance. Its effectiveness was confirmed by the results of the survey of 2 and 3.

  20. Application of quality assurance guidelines to the high pressure gas system, building 331

    International Nuclear Information System (INIS)

    Hanel, S.

    1976-01-01

    Major improvements have been made to decrease the tritium release potential for LLL's tritium-handling facilities in Bldg. 331. Some of the major problems and solutions in designing and building the High Pressure Gas System, which was the first system to be rebuilt are described. To increase system safety, it was necessary to specify material and processes used in component manufacture, to inspect all materials and processes to ensure compliance with specifications, to use proper joint design, to use secondary containment in cases where specifications could not be met, and to exercise tighter control of operating procedures

  1. Scenarios of high greenhouse gas emission reduction in transports and buildings by 2050

    International Nuclear Information System (INIS)

    Teissier, O.; Meunier, L.

    2008-01-01

    The authors report simulations of different environmental policy measures concerning transports and buildings in France. First, they review measures which may entail a reduction of greenhouse gas emissions, and comment their emission reduction potential and their implementation costs. These measures are then ranked, and only those presenting a significant potential and an economically and technologically feasibility are finally considered. Their impact is then simulated by using different models which are adapted to the both sectors and to time ranges. The obtained results are compared to those obtained with a calibrated trend scenario and with a 'factor 4' scenario

  2. Monitoring-based HVAC commissioning of an existing office building for energy efficiency

    International Nuclear Information System (INIS)

    Wang, Liping; Greenberg, Steve; Fiegel, John; Rubalcava, Alma; Earni, Shankar; Pang, Xiufeng; Yin, Rongxin; Woodworth, Spencer; Hernandez-Maldonado, Jorge

    2013-01-01

    Highlights: ► Demonstrated monitoring-based HVAC commissioning using an existing office building. ► Diagnosed various types of faulty operation in the HVAC system by trend data analyses. ► Identified a list of energy saving measures for the HVAC system. ► Quantified energy saving potential for each commissioning measure using calibrated energy simulation model. ► Achieved an actual energy saving of 10% after the implementations of cost-effective measures. -- Abstract: The performance of Heating, Ventilation and Air Conditioning (HVAC) systems may fail to satisfy design expectations due to improper equipment installation, equipment degradation, sensor failures, or incorrect control sequences. Commissioning identifies and implements cost-effective operational and maintenance measures in buildings to bring them up to the design intent or optimum operation. An existing office building is used as a case study to demonstrate the process of commissioning. Building energy benchmarking tools are applied to evaluate the energy performance for screening opportunities at the whole building level. A large natural gas saving potential was indicated by the building benchmarking results. Faulty operations in the HVAC systems, such as improper operations of air-side economizers, simultaneous heating and cooling, and ineffective optimal start, were identified through trend data analyses and functional testing. The energy saving potential for each commissioning measure is quantified with a calibrated building simulation model. An actual energy saving of 10% was realized after the implementations of cost-effective measures.

  3. 46 CFR 121.240 - Gas systems.

    Science.gov (United States)

    2010-10-01

    ... gas (LPG) and compressed natural gas (CNG) must meet the following requirements: (a) The design, installation and testing of each LPG system must meet ABYC A-1, “Marine Liquefied Petroleum Gas (LPG) Systems... 46 Shipping 4 2010-10-01 2010-10-01 false Gas systems. 121.240 Section 121.240 Shipping COAST...

  4. Investigation of a combined gas-steam system with flue gas recirculation

    Directory of Open Access Journals (Sweden)

    Chmielniak Tadeusz

    2016-06-01

    Full Text Available This article presents changes in the operating parameters of a combined gas-steam cycle with a CO2 capture installation and flue gas recirculation. Parametric equations are solved in a purpose-built mathematical model of the system using the Ebsilon Professional code. Recirculated flue gases from the heat recovery boiler outlet, after being cooled and dried, are fed together with primary air into the mixer and then into the gas turbine compressor. This leads to an increase in carbon dioxide concentration in the flue gases fed into the CO2 capture installation from 7.12 to 15.7%. As a consequence, there is a reduction in the demand for heat in the form of steam extracted from the turbine for the amine solution regeneration in the CO2 capture reactor. In addition, the flue gas recirculation involves a rise in the flue gas temperature (by 18 K at the heat recovery boiler inlet and makes it possible to produce more steam. These changes contribute to an increase in net electricity generation efficiency by 1%. The proposed model and the obtained results of numerical simulations are useful in the analysis of combined gas-steam cycles integrated with carbon dioxide separation from flue gases.

  5. The Creation of a French Basic Nuclear Installation - Description of the Regulatory Process - 13293

    Energy Technology Data Exchange (ETDEWEB)

    Mahe, Carole [CEA Marcoule - BP17171 - 30207 Bagnols-Sur-Ceze (France); Leroy, Christine [CEA Cadarache - 13108 Saint Paul-Lez-Durance (France)

    2013-07-01

    CEA is a French government-funded technological research organization. It has to build a medium-level waste interim storage facility because the geological repository will not be available until 2025. This interim storage facility, called DIADEM, has to be available in 2017. These wastes are coming from the research facilities for spent fuel reprocessing and the dismantling of the most radioactive parts of nuclear facilities. The CEA handles the waste management by inventorying the needs and updating them regularly. The conception of the facility is mainly based on this inventory. It provides quantity and characteristics of wastes and it gives the production schedule until 2035. Beyond mass and volume, main characteristics of these radioactive wastes are chemical nature, radioisotopes, radioactivity, radiation dose, the heat emitted, corrosive or explosive gas production, etc. These characteristics provide information to study the repository safety. DIADEM mainly consists of a concrete cell, isolated from the outside, wherein stainless steel welded containers are stored, stacked in a vertical position in the racks. DIADEM is scheduled to store three types of 8 mm-thick, stainless steel cylindrical containers with an outside diameter 498 mm and height from 620 to 2120 mm. DIADEM will be a basic nuclear installation (INB in French) because of overall activity of radioactive substances stored. The creation of a French basic nuclear installation is subject to authorization according to the French law No. 2006-686 of 13 June 2006 on Transparency and Security in the Nuclear Field. The authorization takes into account the technical and financial capacities of the licensee which must allow him to conduct his project in compliance with these interests, especially to cover the costs of decommissioning the installation and conduct remediation work, and to monitor and maintain its location site or, for radioactive waste disposal installations, to cover the definitive shut

  6. The Creation of a French Basic Nuclear Installation - Description of the Regulatory Process - 13293

    International Nuclear Information System (INIS)

    Mahe, Carole; Leroy, Christine

    2013-01-01

    CEA is a French government-funded technological research organization. It has to build a medium-level waste interim storage facility because the geological repository will not be available until 2025. This interim storage facility, called DIADEM, has to be available in 2017. These wastes are coming from the research facilities for spent fuel reprocessing and the dismantling of the most radioactive parts of nuclear facilities. The CEA handles the waste management by inventorying the needs and updating them regularly. The conception of the facility is mainly based on this inventory. It provides quantity and characteristics of wastes and it gives the production schedule until 2035. Beyond mass and volume, main characteristics of these radioactive wastes are chemical nature, radioisotopes, radioactivity, radiation dose, the heat emitted, corrosive or explosive gas production, etc. These characteristics provide information to study the repository safety. DIADEM mainly consists of a concrete cell, isolated from the outside, wherein stainless steel welded containers are stored, stacked in a vertical position in the racks. DIADEM is scheduled to store three types of 8 mm-thick, stainless steel cylindrical containers with an outside diameter 498 mm and height from 620 to 2120 mm. DIADEM will be a basic nuclear installation (INB in French) because of overall activity of radioactive substances stored. The creation of a French basic nuclear installation is subject to authorization according to the French law No. 2006-686 of 13 June 2006 on Transparency and Security in the Nuclear Field. The authorization takes into account the technical and financial capacities of the licensee which must allow him to conduct his project in compliance with these interests, especially to cover the costs of decommissioning the installation and conduct remediation work, and to monitor and maintain its location site or, for radioactive waste disposal installations, to cover the definitive shut

  7. Stabilization of gas turbine unit power

    Science.gov (United States)

    Dolotovskii, I.; Larin, E.

    2017-11-01

    We propose a new cycle air preparation unit which helps increasing energy power of gas turbine units (GTU) operating as a part of combined cycle gas turbine (CCGT) units of thermal power stations and energy and water supply systems of industrial enterprises as well as reducing power loss of gas turbine engines of process blowers resulting from variable ambient air temperatures. Installation of GTU power stabilizer at CCGT unit with electric and thermal power of 192 and 163 MW, respectively, has resulted in reduction of produced electrical energy production costs by 2.4% and thermal energy production costs by 1.6% while capital expenditures after installation of this equipment increased insignificantly.

  8. Solar heating and domestic hot water system installed at North Dallas High School

    Science.gov (United States)

    1980-01-01

    The solar energy system located at the North Dallas High School, Dallas, Texas is discussed. The system is designed as a retrofit in a three story with basement, concrete frame high school building. Extracts from the site files, specification references for solar modification to existing building heating and domestic hot water systems, drawings, installation, operation and maintenance instructions are included.

  9. Thermo Active Building Systems Using Building Mass To Heat and Cool

    DEFF Research Database (Denmark)

    Olesen, Bjarne W.

    2012-01-01

    Using the thermal storage capacity of the concrete slabs between each floor in multistory buildings to heat or cool is a trend that began in the early 1990s in Switzerland.1,2 Pipes carrying water for heating and cooling are embedded in the center of the concrete slab. In central Europe (Germany,......, Austria, Netherlands, etc.), this type of system has been installed in a significant number of new office buildings since the late 1990s. The trend is spreading to other parts of the world (the rest of Europe, North America and Asia)....

  10. Establishment of experimental equipments in irradiation technology development building

    International Nuclear Information System (INIS)

    Ishida, Takuya; Tanimoto, Masataka; Shibata, Akira; Kitagishi, Shigeru; Saito, Takashi; Ohmi, Masao; Nakamura, Jinichi; Tsuchiya, Kunihiko

    2011-06-01

    The Neutron Irradiation and Testing Reactor Center has developed new irradiation technologies to provide irradiation data with high technical value for the resume of the Japan Materials Testing Reactor (JMTR). For the purpose to perform assembling of capsules, materials tests, materials inspection and analysis of irradiation specimens for the development of irradiation capsules, improvement and maintenance of facilities were performed. From the viewpoint of effective use of existing buildings in the Oarai research and development center, the RI application development building was refurbished and maintained for above-mentioned purpose. The RI application development building is a released controlled area, and was used as storage of experimental equipments and stationeries. The building was named 'Irradiation Technology Development Building' after it refurbished and maintained. Eight laboratories were maintained based on the purpose of use, and the installation of the experimental apparatuses was started. A basic management procedure of the Irradiation Technology Development Building was established and has been operated. This report describes the refurbish work of the RI application development building, the installation and operation method of the experimental apparatuses and the basic management procedure of the Irradiation Technology Development Building. (author)

  11. Biogas: the support arrangement is extended to hybrid valorization installations

    International Nuclear Information System (INIS)

    2013-01-01

    This document presents and contains three decrees which authorize the hybrid valorization of biogas, i.e. by production of electricity and of bio-methane which is injected in natural gas networks, in order to support the development of methanization. Prospect development, tariff and contract duration are briefly discussed. The decrees address the contracting conditions between bio-methane producers and natural gas providers, purchase conditions for the electricity produced by biogas installations, purchase conditions of bio-methane injected in natural gas networks. The document also contains the discussion the Commission of energy regulation about the first decree

  12. 30 CFR 57.4530 - Exits for surface buildings and structures.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Exits for surface buildings and structures. 57... Fire Prevention and Control Installation/construction/maintenance § 57.4530 Exits for surface buildings and structures. Surface buildings or structures in which persons work shall have a sufficient number...

  13. Installation of the liquid nitrogen tank for the external cryogenics system

    CERN Multimedia

    2001-01-01

    The picture shows the installation of the 50000l liquid nitrogen tank in its first position next to the SHL annex of the SX5 building. The tank will be moved to its final position after the completion of the surface tests.

  14. Modern problems of relaxation gas dynamics

    International Nuclear Information System (INIS)

    Losev, S.A.; Osipov, A.I.

    1985-01-01

    Some of the dynamical characteristics of relaxation processes are studied. Unfortunately, many dynamical characteristics of relaxation processes, necessary for the solution of important scientific and applied problems, are not known. These problems require further development of experimental methods of the study of nonequilibrium gas. It is known, that gas systems are shifted from the equilibrium by different methods: by acoustic and shock wav es, by means of gas expansion in nozzles and jets, by powerful radiations (laser, first of all), by electric discharges, in burning and combustion devices, etc. Non-equilibrium gas is produced in installations of continuum, impulse and periodic regime. Molecular beams, shock tubes (especially with nozzles), flow and jet installations, aerodynamical tubes, plasmatrons, vessels with a gas, influenced by the strong radiation, burners and combustion devices, where the study of non-euilibrium gas is helpful to solve the problems of the determination of kinetic equations and constants of physico-chemical kinetics

  15. Improvement of the greenhouse effect accounting of the waste storage installations; Ameliorer le bilan effet de serre des installations de stockage des dechets

    Energy Technology Data Exchange (ETDEWEB)

    Couturier, Ch.

    2003-07-01

    The wastes storage installations are responsible of 3 to 4 % of the greenhouse gases emissions in France and Europe. In spite of the decrease since ten years of the emissions hopeful the gas collect on the main sites, it is still possible to improve the greenhouse gases emission in the wastes disposals. The possible measures are presented: the bio-reactor, the improvement of the gas extraction systems, the choice of exploitation modes to limit the fill in times, the biogas valorization. (A.L.B.)

  16. Building Commissioning: A Golden Opportunity for Reducing Energy Costs and Greenhouse-gas Emissions

    Energy Technology Data Exchange (ETDEWEB)

    Mills, Evan

    2009-07-16

    data are available revealed over 10,000 energy-related problems, resulting in 16% median whole-building energy savings in existing buildings and 13% in new construction, with payback time of 1.1 years and 4.2 years, respectively. In terms of other cost-benefit indicators, median benefit-cost ratios of 4.5 and 1.1, and cash-on-cash returns of 91% and 23% were attained for existing and new buildings, respectively. High-tech buildings were particularly cost-effective, and saved higher amounts of energy due to their energy-intensiveness. Projects with a comprehensive approach to commissioning attained nearly twice the overall median level of savings and five-times the savings of the least-thorough projects. It is noteworthy that virtually all existing building projects were cost-effective by each metric (0.4 years for the upper quartile and 2.4 years for the lower quartile), as were the majority of new-construction projects (1.5 years and 10.8 years, respectively). We also found high cost-effectiveness for each specific measure for which we have data. Contrary to a common perception, cost-effectiveness is often achieved even in smaller buildings. Thanks to energy savings valued more than the cost of the commissioning process, associated reductions in greenhouse gas emissions come at 'negative' cost. In fact, the median cost of conserved carbon is negative - -$110 per tonne for existing buildings and -$25/tonne for new construction - as compared with market prices for carbon trading and offsets in the +$10 to +$30/tonne range. Further enhancing the value of commissioning, its non-energy benefits surpass those of most other energy-management practices. Significant first-cost savings (e.g., through right-sizing of heating and cooling equipment) routinely offset at least a portion of commissioning costs - fully in some cases. When accounting for these benefits, the net median commissioning project cost was reduced by 49% on average, while in many cases they exceeded

  17. Final Report. Solar Assist for Administration Building and Community Gym/Pool

    Energy Technology Data Exchange (ETDEWEB)

    Synder, Randy [Tonto Apache Tribe, Payson, AZ (United States); Bresette, Joseph [Tonto Apache Tribe, Payson, AZ (United States)

    2015-06-23

    Tonto Apache Tribe applied to the Department of Energy’s “Tribal Energy Program” for the “Community Scale Clean Energy Projects” in Indian Country in 2013 to implement a solar project to reduce energy use in two tribal buildings. Total estimated project cost was $804,140, with the Department and Tribe each providing 50% of the project costs. Photovoltaic systems totaling 75 kW on the Administration Building and 192 kW on the Gymnasium were installed. We used roof tops and installed canopies in adjacent parking areas for mounting the systems. The installed systems were designed to offset 65% of the facilities electric load.

  18. Decision 99-27 application 1029022 - Petro-Canada Oil and Gas application to install compressors at the Wilson Creek gas plant and at LSD 3-19-43-4 W5M, Wilson Creek Field

    International Nuclear Information System (INIS)

    1999-11-01

    Petro-Canada Oil and Gas applied to the Alberta Energy and Utilities Board (EUB) for approval to add two new compressors at the existing Wilson Creek sour gas processing facility, and to construct and operate a new sour gas compressor station in Alberta. The application was made pursuant to Section 26 (1)(b) of the Oil and Gas Conservation Act and Sections 7.001, 9.020, and 15.050 of the Oil and Gas Conservation Regulations. The applications and interventions were considered at a hearing at the Last West Hall, Rimbley, Alberta, commencing 7 April 1999. The issues concerning the applications were: the need for and location of the compressors, plant life, emissions, sulphur recovery, and noise. Petro-Canada will proceed with its commitment to local landowners to install and commission a sulphur recovery unit within 16 months of the date of this report. The sulphur recovery capability of the facility will meet guidelines defined in IL 88-13 for new sour gas plants based on either the current or an acceptable maximum daily inlet sulphur rate. Continuous-vent gas streams, including glycol regenerator, produced-water tank, and hydrocarbon condensate tank vents, at both the 3-29 compressor and at the Wilson Creek plant site will be burned in a flare or incinerator. Flare stacks at the 3-19 compressor site will be equipped with a suitable pilot and automatic igniter. The Wilson Creek plant flare system will be equipped with a suitable pilot, as well as automatic igniter and/or flame failure detection system. Petro-Canada will implement local ambient air quality monitoring and sound level monitoring consistent with its commitments to local landowners and regulatory requirements

  19. Contributing to Net Zero Building: High Energy Efficient EIFS Wall Systems

    Energy Technology Data Exchange (ETDEWEB)

    Carbary, Lawrence D. [Dow Corning Corporation; Perkins, Laura L. [Dow Corning Corporation; Serino, Roland [Dryvit Systems, Inc; Preston, Bill [Dryvit Systems, Inc; Kosny, Jan [Fraunhofer USA, Inc. CSE

    2014-01-29

    The team led by Dow Corning collaborated to increase the thermal performance of exterior insulation and finishing systems (EIFS) to reach R-40 performance meeting the needs for high efficiency insulated walls. Additionally, the project helped remove barriers to using EIFS on retrofit commercial buildings desiring high insulated walls. The three wall systems developed within the scope of this project provide the thermal performance of R-24 to R-40 by incorporating vacuum insulation panels (VIPs) into an expanded polystyrene (EPS) encapsulated vacuum insulated sandwich element (VISE). The VISE was incorporated into an EIFS as pre-engineered insulation boards. The VISE is installed using typical EIFS details and network of trained installers. These three wall systems were tested and engineered to be fully code compliant as an EIFS and meet all of the International Building Code structural, durability and fire test requirements for a code compliant exterior wall cladding system. This system is being commercialized under the trade name Dryvit® Outsulation® HE system. Full details, specifications, and application guidelines have been developed for the system. The system has been modeled both thermally and hygrothermally to predict condensation potential. Based on weather models for Baltimore, MD; Boston, MA; Miami, FL; Minneapolis, MN; Phoenix, AZ; and Seattle, WA; condensation and water build up in the wall system is not a concern. Finally, the team conducted a field trial of the system on a building at the former Brunswick Naval Air Station which is being redeveloped by the Midcoast Regional Redevelopment Authority (Brunswick, Maine). The field trial provided a retrofit R-30 wall onto a wood frame construction, slab on grade, 1800 ft2 building, that was monitored over the course of a year. Simultaneous with the façade retrofit, the building’s windows were upgraded at no charge to this program. The retrofit building used 49% less natural gas during the winter of

  20. Installation, tests and start up of the Tandetron positive ions accelerator

    International Nuclear Information System (INIS)

    Valdovinos A, M.A.; Hernandez M, V.

    2000-01-01

    The National Institute of Nuclear Research acquired a Positive ions accelerator type Tandetron 2MV of the Dutch Company High Voltage Engineering, Europe B.V. (H.V.E.E.) which was installed in the building named Irradiator Nave which is occupied by the Gamma irradiator and the Pelletron accelerator. Starting from the accelerator selection it was defined the conditions required for the operation of this as well as: electric feeding, water quality and quantity, air compressed, temperature, humidity, etc.; as well as the necessary modifications of the installation area. (Author)

  1. Design and Installation of Irrigation System for the Expansion of Sugar cane- Industries in Ahvaz, IRAN.

    Science.gov (United States)

    Afshari, E.; Afshari, S.

    2005-12-01

    This paper presents achievements of a twelve years ongoing project expansion of sugar cane- industries as a major agricultural development in Ahvaz, IRAN. The entire project is divided in to seven units and each unit provides irrigation water for 30,000 acres of sugar cane farms in Ahwaz. Absou Inc. is one of the consulting firms that is in charge of design and overseeing installation of irrigation system as well as the development of lands for sugar-cane cultivation at one of the units, called Farabi unit .In general, the mission of project is to Pump fresh water from Karoon River and direct it to the sugar cane farm for irrigation. In particular, the task of design and installation include, (1) build a pumping station at Karoon River with capacity of 1271 ft3/sec, (2) transfer water by main channel from Karoon rive to the farm site 19 miles (3) install a secondary pumping stations which direct water from main channel to drainage pipes and provides water for local farms (4) build a secondary channels which carries water with pipe lines with total length of 42 miles and diameter of 16 to 32 inch. (5) install drainage pump stations and collectors (6) level the ground surface and prepare it for irrigation (7) build railroad for carrying sugar canes (23 miles). Thus far, more than 15,000 acres of farm in Farabi unit is under sugar cane cultivation. The presentation will illustrate more details about different aspects of the project including design, installation and construction phases.

  2. Exhaust gas recirculation apparatus for internal combustion engine

    Energy Technology Data Exchange (ETDEWEB)

    Shigemori, M; Eguchi, N

    1975-01-07

    An exhaust gas recirculation device to reduce nitrogen oxides emission from internal combustion engines is described. The recirculation is achieved by employing a tube connecting between the exhaust pipe and intake tube. A throttle valve is installed within the exhaust pipe between the muffler and recirculation tube, and regulated by exhaust gas temperature. Whenever the gas temperature is high, the valve closes and increases the gas flow to the intake tube. A temperature sensor is installed within the exhaust pipe and controls a solenoid or magnetic air valve linking to the throttle valve through a relay. The recirculation tube can be cooled by a fan to improve the engine power.

  3. Fiscal year 1995 well installation program summary Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-09-01

    This report summarizes the well installation activities conducted during the federal fiscal year (FY) 1995 drilling program at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee (including activities that were performed in late FY 1994, but not included in the FY 1994 Well Installation Program Summary Report). Synopses of monitoring well construction/well development data, well location rationale, geological/hydrological observations, quality assurance/quality control methods, and health and safety monitoring are included. Three groundwater monitoring wells and two gas monitoring probes were installed during the FY 1995 drilling program. One of the groundwater monitoring wells was installed at Landfill VI, the other two in the Boneyard/Burnyard area. All of the groundwater monitoring wells were constructed with stainless steel screens and casings. The two gas monitoring probes were installed at the Centralized Sanitary Landfill II and were of polyvinyl chloride (PVC) screened construction. Eleven well rehabilitation/redevelopment efforts were undertaken during FY 1995 at the Y-12 Plant. All new monitoring wells and wells targeted for redevelopment were developed by either a 2.0-in. diameter swab rig or by hand bailing until nonspecific parameters (pH and specific conductance) attained steady-state levels. Turbidity levels were lowered, if required, to the extent practicable by continued development beyond a steady-state level of pH and conductance

  4. Shale gas, Poland pioneer of exploitation in Europe

    International Nuclear Information System (INIS)

    Rybicka, Urszula; Khalatbari, Azar; Schneider, Frederic; Nabrdalik, Maciek

    2012-01-01

    This article presents an installation built by a Polish company to perform drillings in the search for shale gas pockets from which gas would be extracted by hydraulic fracturing. Some technical characteristics of the installation and process are evoked. The article outlines the confidence the population now has gained in this installation. However and despite the fact that the region possesses important underground water reserves, water consumption is reported to be too high with respect to farmer needs. Besides, some farmers have had a compulsory purchase order made on their land and could afford to buy new lands. However, in some other places, the population did not accept the arrival of the multinational company Chevron. In parallel, a brief overview of shale gas exploitation projects or status in other European countries is given

  5. Building 887: An Aladdin's Cave for Physicists

    CERN Multimedia

    2001-01-01

    Building 887 on the Prévessin site is home to numerous experiments bringing together physicists and engineers from around the world. Its diversity makes the huge building a replica of CERN in miniature. The Installation unit of the SL EA group in front of the support structure for the ATLAS muon chambers. From left to right, seated: Pierre Gimenez, Yves Bonnet, Yves Naveau, Alain Pinget, Christian Becquet, Camille Adenot; standing: Philippe Guillot, Thierry Reynes, Monserrat Zurita-Perez, Claude Ferrari et Denis Gacon. The big wheel to be used for the ATLAS muon chambers (see below) is much the most spectacular installation currently occupying Building 887. But it is far from being the only attraction. Push open the heavy doors of this immense hall and it is a bit like entering a physicists' Aladdin's cave. The building, 55 metres wide and 300 metres long, is a treasure trove of engineering and technology, a CERN in miniature, housing dozens of collaborations from all over the world. With its 150...

  6. 46 CFR 58.10-15 - Gas turbine installations.

    Science.gov (United States)

    2010-10-01

    ... applicable, shall be furnished. (c) Exhausts. (1) Where piping is used for gas turbine exhaust lines, Class II is required as a minimum. (See subpart 56.04 of this subchapter.) Where the exhaust pressure... other than pipe is employed, the drawings and design data shall be submitted to substantiate suitability...

  7. Performance analysis and investigation of a grid-connected photovoltaic installation in Morocco

    Directory of Open Access Journals (Sweden)

    Kamal Attari

    2016-11-01

    Full Text Available The paper present an evaluation of a grid-connected photovoltaic (PV system installed on the roof of a government building located in Tangier, Morocco. The experimental data was recorded from 1st January 2015 to December 2015 based on real time observation. The aim is to encourage the use of solar PV system for government, commercial and residence building in Morocco based on the obtained results. The system is made up of 20 modules of 250 Wp and one inverter of 5 kW. The assessed parameters of the PV installation includes energy output, final yield, modules temperature, efficiency module, performance ratio (PR and others. The PV park supplied the grid with 6411.3 kWh during the year 2015. The final yield (Yf ranged from 1.96 to 6.42 kWh/kWp, the performance ratio (PR ranged from 58% to 98% and the annual capacity factor was found to be 14.84%. The final yield of PV installation is compared with other final yields of solar PV systems located at other places. Finally various power losses are given through a diagram loss.

  8. Decommissioning and abandonment of offshore installations

    International Nuclear Information System (INIS)

    Side, J.C.

    1992-01-01

    To the onlooker surprising little thought was given at the project planning stage to the fate of offshore facilities once their production lifetimes had come to an end. Throughout the 1970s at least, international law required the complete removal of all structures and installations one disused or abandoned. Fishermen's organisations were led to believe that such installations would be entirely removed yet many of the designs of these show that removal was not much in the minds of the engineers or project management during the design stages. Changes in the text of the United Nations' Convention on the Law of the Sea and (by their widespread legal adoption) in customary international law may now permit partial removal of installations subject to important safeguards for navigation, the environment and other users of the sea. Of the North Sea states at least one has adopted policies that will minimise the cost associated with offshore decommissioning and abandonment and both the UK and Norway are adopting legislation which will provide for a case by case approach to the decommissioning and abandonment of offshore facilities and allow partial removal options. There has thus been a recent and significant change in approach to the abandonment of offshore oil and gas installations. This chapter reviews the development of abandonment laws and policies, outlines the available removal options, and provides a consideration of the environmental and fishery implications of these for the North Sea. (Author)

  9. Enhancement of the Haemmerli hydro power installation in Lenzburg, Switzerland; Gemeinde Lenzburg (AG). Ausbau Kraftwerk Haemmerli - Vorstudie

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-08-15

    This preliminary report for the Swiss Federal Office of Energy (SFOE) presents a project on the refurbishment of an old industrial small hydro installation on the Aabach stream in Lenzburg, Switzerland. The state of the existing installation is described as is the station's concession. The proposals for the renewal of this installation are described and discussed. The necessary building work and the installations required are examined. Investment costs, operating and maintenance costs and expected profitability are discussed. The report is completed with suggestions for further work.

  10. Introduction: Green Building Handbook

    CSIR Research Space (South Africa)

    Van Wyk, Llewellyn V

    2010-08-01

    Full Text Available By recognising the specific environmental challenges facing South Africa, mindful of the government‘s commitment to reducing South Africa‘s Greenhouse gas emissions, and acknowledging the need to build social cohesion, the Green Building Handbook...

  11. Worldwide natural gas pipeline situation. Sekai no tennen gas pipeline jokyo

    Energy Technology Data Exchange (ETDEWEB)

    Arimoto, T [Osaka Gas Co. Ltd., Osaka (Japan)

    1993-03-01

    Constructing natural gas pipelines in wide areas requires investments of a huge amount. Many countries are building natural gas supply infrastructures under public support as nations' basic policy of promoting use of natural gas. This paper describes the present conditions of building pipelines in Western Europe, the U.S.A., Korea and Taiwan. In Western Europe, transporting companies established in line with the national policy own trunk pipelines and storage facilities, and import and distribute natural gas. The U.S.A. has 2300 small and large pipeline companies bearing transportation business. Pipelines extend about 1.9 million kilometers in total, with trunk pipelines accounting for about 440,000 kilometers. The companies are given eminent domain for the right of way. Korea has a plan to build a pipeline network with a distance of 1600 kilometers in around 2000. Taiwan has completed trunk pipelines extending 330 kilometers in two years. In Japan, the industry is preparing draft plans for wide area pipeline construction. 5 figs., 1 tab.

  12. Control of Greenhouse Gas Emissions by Optimal DER Technology Investment and Energy Management in Zero-Net-Energy Buildings

    International Nuclear Information System (INIS)

    Stadler, Michael; Siddiqui, Afzal; Marnay, Chris; Aki, Hirohisa; Lai, Judy

    2009-01-01

    The U.S. Department of Energy has launched the commercial building initiative (CBI) in pursuit of its research goal of achieving zero-net-energy commercial buildings (ZNEB), i.e. ones that produce as much energy as they use. Its objective is to make these buildings marketable by 2025 such that they minimize their energy use through cutting-edge, energy-efficiency technologies and meet their remaining energy needs through on-site renewable energy generation. This paper examines how such buildings may be implemented within the context of a cost- or CO2-minimizing microgrid that is able to adopt and operate various technologies: photovoltaic modules (PV) and other on-site generation, heat exchangers, solar thermal collectors, absorption chillers, and passive/demand-response technologies. A mixed-integer linear program (MILP) that has a multi-criteria objective function is used. The objective is minimization of a weighted average of the building's annual energy costs and CO2 emissions. The MILP's constraints ensure energy balance and capacity limits. In addition, constraining the building's energy consumed to equal its energy exports enables us to explore how energy sales and demand-response measures may enable compliance with the ZNEB objective. Using a commercial test site in northernCalifornia with existing tariff rates and technology data, we find that a ZNEB requires ample PV capacity installed to ensure electricity sales during the day. This is complemented by investment in energy-efficient combined heat and power (CHP) equipment, while occasional demand response shaves energy consumption. A large amount of storage is also adopted, which may be impractical. Nevertheless, it shows the nature of the solutions and costs necessary to achieve a ZNEB. Additionally, the ZNEB approach does not necessary lead to zero-carbon (ZC) buildings as is frequently argued. We also show a multi-objective frontier for the CA example, whichallows us to estimate the needed technologies

  13. Climate Responsive Buildings Concepts in Hong Kong

    DEFF Research Database (Denmark)

    Haase, M.; Amato, A.; van der Aa, A.

    2006-01-01

    There is a global need for a more sustainable building development. About 50% of energy is used in buildings indicating that buildings provide a considerable potential for operational energy savings. Studies were conducted with the following objectives: to perform a state-of-the-art review...... energy saving installations are increasingly applied as heat pumps in combination with energy storage, balanced ventilation with heat recovery, cooling towers etc. In Hong Kong in most cases there is no integrated design process for building projects. This means that projects are developed and designed...

  14. The consequences of liberalisation of the gas market. Part 6. Suppliers

    International Nuclear Information System (INIS)

    Van Gelder, J.W.

    1999-01-01

    Deregulation in the energy sector has forced companies to scale up. Natural gas suppliers and installers are confronted with more pressure to cut prices and bigger turnover fluctuations. Companies doing business with gas companies try to escape the consequences of deregulation by developing new products and improving their services. In the sixth and last article in the series on the effects of the liberalisation of the Dutch gas market, suppliers express their concern about the changes triggered by the deregulated market. Challenges and opportunities of deregulation are discussed as well. The bigger companies in the installation sector will be looking for opportunities to render energy services independently or in co-operation with (foreign) partners. For smaller installers, however, co-operation seems to be an interesting option, either with other installers or with energy companies

  15. Experimental and Numerical Investigation of the Tracer Gas Methodology in the Case of a Naturally Cross-Ventilated Building

    DEFF Research Database (Denmark)

    Nikolopoulos, Nikos; Nikolopoulos, Aristeidis; Larsen, Tine Steen

    2012-01-01

    The paper presents the investigation of a naturally cross – ventilated building using both experimental and numerical methods with the parameters being the free-stream and the incidence angle of the wind to the openings of the building. The experimental methodology calculates the air change rate......, focusing on the time dependent character of the induced flow field. The numerical results are compared with corresponding experimental data for the three aforementioned experimental methodologies in the case of a full scale building inside a wind-tunnel. The numerical investigation reveals that for large...... based either on measurements of the inlet velocity profile, the outlet velocity profile or the descending rate of the tracer gas concentration using the decay method. The numerical investigation is based on the solution of the governing Navier-Stokes equations in their full three dimensional expression...

  16. The suitability and installation of technological equipment when upgrading existing facilities

    Directory of Open Access Journals (Sweden)

    Ladnushkin A. A.

    2016-03-01

    Full Text Available to date, a large number of Russian companies in diverse and various industries, has old equipment and requires modernization of the technological process due to the growth of scientific and technological progress. In order to achieve goals when upgrading is considered such an important aspect as the readiness of the new equipment installation. Mounting hardware suitability describes the suitability and readiness of equipment for efficient Assembly at the user. Replacement of technological equipment requires large volumes of works on installation and dismantling, in the absence of the building has its own lifting mechanisms require large financial and labor costs. One of possible methods for replacement of process equipment is the technology of without crane installation allows us to carry out work in existing space planning. Today is the question of the necessity of development and introduction of new technological production methods and fixtures tooling in which it is possible to conduct installation and dismantling of technological equipment in the operating production process.

  17. Characterization of the Three Mile Island Unit-2 reactor building atmosphere prior to the reactor building purge

    International Nuclear Information System (INIS)

    Hartwell, J.K.; Mandler, J.W.; Duce, S.W.; Motes, B.G.

    1981-05-01

    The Three Mile Island Unit-2 reactor building atmosphere was sampled prior to the reactor building purge. Samples of the containment atmosphere were obtained using specialized sampling equipment installed through penetration R-626 at the 358-foot (109-meter) level of the TMI-2 reactor building. The samples were subsequently analyzed for radionuclide concentration and for gaseous molecular components (O 2 , N 2 , etc.) by two independent laboratories at the Idaho National Engineering Laboratory (INEL). The sampling procedures, analysis methods, and results are summarized

  18. A Techno-Economic Analysis of Photovoltaic System Design as Specifically Applied to Commercial Buildings in Ireland

    Directory of Open Access Journals (Sweden)

    Jonathan Blackledge

    2012-11-01

    Full Text Available This paper evaluates the viability of installing photovoltaic (PV systems in existing commercial buildings in Dublin. Data collected from previously installed photovoltaic systems at the Dublin Institute of Technology was analysed in order to determine the potential solar resource available in Ireland. A 1.1 kWp photovoltaic system installed in Dublin can produce over 900 kWh of electricity in a given year depending on the available solar resource for that year. A feasibility study was conducted in Dublin city centre in order to evaluate the technical, financial and environmental aspects of integrating a PV system into an existing building. The intention is that the results from this work will help in demonstrating the benefits and challenges associated with installing PV systems in existing commercial buildings in Ireland.

  19. Analysis of Energy and Power Generation in a Photovoltaic Micro installation Interconnected with a Low Voltage Grid

    Directory of Open Access Journals (Sweden)

    Marian Sobierajski

    2015-12-01

    Full Text Available The paper discusses the performance of the 15 kW photovoltaic micro installation located on the roof of building D-1 of the Faculty of Electrical Engineering at Wroclaw University of Technology. The micro installation is connected to the low voltage grid, which supplies the new, air-conditioned building D-20. The paper discusses the energy and power generation output in yearly, monthly, and daily intervals. The micro installation’s output in the summer morning peaks is compared with the daily wind generation against the background of the demand, generation, regulation reserve, and overhauls in the National Power System.

  20. Sizing Combined Heat and Power Units and Domestic Building Energy Cost Optimisation

    OpenAIRE

    Dongmin Yu; Yuanzhu Meng; Gangui Yan; Gang Mu; Dezhi Li; Simon Le Blond

    2017-01-01

    Many combined heat and power (CHP) units have been installed in domestic buildings to increase energy efficiency and reduce energy costs. However, inappropriate sizing of a CHP may actually increase energy costs and reduce energy efficiency. Moreover, the high manufacturing cost of batteries makes batteries less affordable. Therefore, this paper will attempt to size the capacity of CHP and optimise daily energy costs for a domestic building with only CHP installed. In this paper, electricity ...

  1. Evaluation of Stiffness Changes in a High-Rise Building by Measurements of Lateral Displacements Using GPS Technology

    Science.gov (United States)

    Choi, Se Woon; Kim, Ill Soo; Park, Jae Hwan; Kim, Yousok; Sohn, Hong Gyoo; Park, Hyo Seon

    2013-01-01

    The outrigger truss system is one of the most frequently used lateral load resisting structural systems. However, little research has been reported on the effect of installation of outrigger trusses on improvement of lateral stiffness of a high-rise building through full-scale measurements. In this paper, stiffness changes of a high-rise building due to installation of outrigger trusses have been evaluated by measuring lateral displacements using a global positioning system (GPS). To confirm the error range of the GPS measurement system used in the full-scale measurement tests, the GPS displacement monitoring system is investigated through a free vibration test of the experimental model. Then, for the evaluation of lateral stiffness of a high-rise building under construction, the GPS displacement monitoring system is applied to measurements of lateral displacements of a 66-story high-rise building before and after installation of outrigger truss. The stiffness improvement of the building before and after the installation is confirmed through the changes of the natural frequencies and the ratios of the base shear forces to the roof displacements. PMID:24233025

  2. Evaluation of Stiffness Changes in a High-Rise Building by Measurements of Lateral Displacements Using GPS Technology

    Directory of Open Access Journals (Sweden)

    Se Woon Choi

    2013-11-01

    Full Text Available The outrigger truss system is one of the most frequently used lateral load resisting structural systems. However, little research has been reported on the effect of installation of outrigger trusses on improvement of lateral stiffness of a high-rise building through full-scale measurements. In this paper, stiffness changes of a high-rise building due to installation of outrigger trusses have been evaluated by measuring lateral displacements using a global positioning system (GPS. To confirm the error range of the GPS measurement system used in the full-scale measurement tests, the GPS displacement monitoring system is investigated through a free vibration test of the experimental model. Then, for the evaluation of lateral stiffness of a high-rise building under construction, the GPS displacement monitoring system is applied to measurements of lateral displacements of a 66-story high-rise building before and after installation of outrigger truss. The stiffness improvement of the building before and after the installation is confirmed through the changes of the natural frequencies and the ratios of the base shear forces to the roof displacements.

  3. Air quality impact of a pair of 150 MW gas turbines pre-installation study on the Champagne-sur-Oise site

    Energy Technology Data Exchange (ETDEWEB)

    Daganaud, A

    1994-12-31

    In the framework of a project for the installation of two gas turbines at the CHAMPAGNE-SUR-OISE power plant, EDF-CNET (Centre National de l`Equipement Thermique) is required to submit an impact report, which includes the present contribution. The purpose of the study was to perform atmospheric dispersion calculations to assess the sulphur dioxide and nitrogen oxide ground concentration levels liable to be incurred by such installations under specified operating conditions. Using the Gaussian dispersion model MULTIPOL, numerical simulations were performed over a 10-year period, based on the chronological stations. The ``fallout`` calculations were performed with an hourly time step over a 1200 point grid covering a 40 x 40 km zone around the plant. The resulting pollution is expressed for each point in terms of annual mean concentrations and daily and hourly mean concentration distributions. Main results are presented as pollution maps, which can then be easily checked against current regulatory values. Two scenarios were simulated : year-long full power operation, which is a fictitious bounding case scenario, and operation about 12 hours per day on 20 to 25 days per year, during the coldest winter periods, which is the most probable scenario. Pollution liable to result from this type of installation was found to be extremely slight. At the most exposed points of the site, the mean SO{sub 2} and NO{sub 2} concentrations obtained for all operating days were only 3{mu}g/m{sup 3} and hourly peaks amounted at most to a few tens of {mu}g/m{sup 3}. Such values remain well below the stipulated limits for these pollutants and the future guide values determined by the European authorities. Increasing the existing very low background level by this specific amount should consequently raise no problems. (Author). 18 figs., 3 annexes., 12 refs.

  4. Torsion instability of Dynamic Cables during Installation

    OpenAIRE

    Opgård, Marie Finstad

    2017-01-01

    The oil and gas industry today is a heavily regulated segment, and current standard hasestablished restrictions which yields a very limited weather window for offshore cable installations. This is due to experience with cable failure in harsh weather. A limiting factor in current practice is the design criterion for the minimum allowable radius of curvature in the touchdown point. In addition, current practice does not allow for occurrence of compression in the touch down zone...

  5. Scenarios for remote gas production

    International Nuclear Information System (INIS)

    Tangen, Grethe; Molnvik, Mona J.

    2009-01-01

    The amount of natural gas resources accessible via proven production technology and existing infrastructure is declining. Therefore, smaller and less accessible gas fields are considered for commercial exploitation. The research project Enabling production of remote gas builds knowledge and technology aiming at developing competitive remote gas production based on floating LNG and chemical gas conversion. In this project, scenarios are used as basis for directing research related to topics that affect the overall design and operation of such plants. Selected research areas are safety, environment, power supply, operability and control. The paper summarises the scenario building process as a common effort among research institutes and industry. Further, it documents four scenarios for production of remote gas and outlines how the scenarios are applied to establish research strategies and adequate plans in a multidisciplinary project. To ensure relevance of the scenarios, it is important to adapt the building process to the current problem and the scenarios should be developed with extensive participation of key personnel.

  6. Customized overhead cranes for installation of India's largest 3.6m optical telescope at Devasthal, Nainital, India

    Science.gov (United States)

    Bangia, Tarun; Yadava, Shobhit; Kumar, Brijesh; Ghanti, A. S.; Hardikar, P. M.

    2016-07-01

    India's largest 3.6 m aperture optical telescope facility has been recently established at Devasthal site by Aryabhatta Research Institute of Observation Sciences (ARIES), an autonomous Institute under Department of Science and Technology, Government of India. The telescope is equipped with active optics and it is designed to be used for seeinglimited observations at visible and near-infrared wavelengths. A steel building with rotating cylindrical steel Dome was erected to house 3.6m telescope and its accessories at hilltop of Devasthal site. Customized cranes were essentially required inside the building as there were space constraints around the telescope building for operating big external heavy duty cranes from outside, transportation constraints in route for bringing heavy weight cranes, altitude of observatory, and sharp bends etc. to site. To meet the challenge of telescope installation from inside the telescope building by lifting components through its hatch, two Single Girder cranes and two Under Slung cranes of 10 MT capacity each were specifically designed and developed. All the four overhead cranes were custom built to achieve the goal of handling telescope mirror and its various components during installation and assembly. Overhead cranes were installed in limited available space inside the building and tested as per IS 3177. Cranes were equipped with many features like VVVFD compatibility, provision for tandem operation, digital load display, anti-collision mechanism, electrical interlocks, radio remote, low hook height and compact carriage etc. for telescope integration at site.

  7. Evaluation and planning for lightning rod grounding of PSTA cyclotron building

    International Nuclear Information System (INIS)

    Suyamto; Taufik; Idrus Abdul Kudus

    2015-01-01

    Lightning rod connected with the ground resistance is an equipment protection against hazards of lightning strikes building. Lightning strike to the building may result in damage to the building and destroy all the equipment inside it. The need for a lightning rod of a building is regulated in PUIPP expressed with risk factors (FR). The amount of FR is the sum of the value of the index of five (5 ) components of the building i.e building functions, construction, the height and the situation of the building and and the number of yearly lightning days in that places. At this time 05 PSTA building has undergone changes in the function of the building's mechanical workshop into a cyclotron building so that safety criteria also change into vital building with lightning rods resistance have to < 1 Ω. From measurements of grounding resistant which exist at present known that average Rp is 1.26 Ω so it is necessary to install new additional grounding resistance to reduce being less than 1 Ω. To fulfil this and taking into consideration the cost and ease of installation, planned addition of a grounding using electrodes solid rods of copper, a diameter of 16 mm and a length of 4 m , planted the soil water depth of 12 m, as well as clay covering, with a water content of about 30 %. Under these conditions and taking into the cost and ease of installation are expected to obtain optimal results i.e. soil resistivity 18.35 Ω-m and its resistance of Rx 4.82 Ω. When coupled with existing grounding final resistant Rp 0.99 Ω obtained is thus fulfilling the requirements of PUIPP that is less than 1 Ω. (author)

  8. Solar heating, cooling, and domestic hot water system installed at Kaw Valley State Bank and Trust Company, Topeka, Kansas

    Science.gov (United States)

    1980-01-01

    The building has approximately 5600 square feet of conditioned space. Solar energy was used for space heating, space cooling, and preheating domestic hot water (DHW). The solar energy system had an array of evacuated tube-type collectors with an area of 1068 square feet. A 50/50 solution of ethylene glycol and water was the transfer medium that delivered solar energy to a tube-in-shell heat exchanger that in turn delivered solar heated water to a 1100 gallon pressurized hot water storage tank. When solar energy was insufficient to satisfy the space heating and/or cooling demand, a natural gas-fired boiler provided auxiliary energy to the fan coil loops and/or the absorption chillers. Extracts from the site files, specification references, drawings, and installation, operation and maintenance instructions are presented.

  9. Determination of the NPP Cernavoda reactor building seismic response

    International Nuclear Information System (INIS)

    Krutzik, N.J.; Rotaru, I.; Bobei, M.; Mingiuc, C.; Serban, V.

    1997-01-01

    Seismic input for systems and equipment installed in buildings depends on: - the seismic movement in free field on site; - the building movement in the soil; - the building deflection. The percentage of the 3 movements for the system and equipment input, depends on the position of the systems and equipment inside the building as well on the type of the foundation soil. The type of the foundation soil is important because if it is stiff it transfers a lot of energy to the building, energy which amplify the movement of the building on the top. If the foundation soil is soft, it accommodates the overall movement of the building in the soil, amplifying the movement to lower levels and the building response is attenuated if a resonance phenomenon between the whole building movement and the seismic excitation does not exist. This input is given with the design floor response spectra (FRS), in the logarithmic scale and seismic anchor movement (SAM). The design floor response spectra for NPP Cernavoda U1 Nuclear Building were determined in several stages starting with simple models (STICK type) without twisting movement and ending with detailed 3-dimensional models. From the point of view of dynamic behavior, the Reactor Building can be considered to be made up of 4 sub-structures: the containment building, internal structures containing separate elements such as the reactor vault, the fuel transfer structure and itself. Each sub-structure has its own movement (some of the structures present also some local effects) which combines with the overall movement of the building in the soil and the seismic excitation produce the total movement so that the response spectrum for each point of the sub-structure is specific. One should note that for structures which also show the twisting effect, the selection of the points on the floor, for the determination on the response spectra, is an engineering decision so that the response should be relevant for the equipment installed on the

  10. Radon Protection in the Technical Building Code

    International Nuclear Information System (INIS)

    Frutos, B.; Garcia, J. P.; Martin, J. L.; Olaya, M.; Serrano, J I.; Suarez, E.; Fernandez, J. A.; Rodrigo, F.

    2003-01-01

    Building construction in areas with high radon gas contamination in land requires the incorporation of certain measures in order to prevent the accumulation of this gas on the inside of buildings. These measures should be considered primarily in the design and construction phases and should take the area of the country into consideration where the construction will take place depending on the potential risk of radon entrance. Within the Technical Building Code, radon protection has been considered through general classification of the country and specific areas where building construction is to take place, in different risk categories and in the introduction of building techniques appropriate for each area. (Author) 17 refs

  11. High Performance Building Mockup in FLEXLAB

    Energy Technology Data Exchange (ETDEWEB)

    McNeil, Andrew [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Kohler, Christian [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Lee, Eleanor S. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Selkowitz, Stephen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2017-08-30

    Genentech has ambitious energy and indoor environmental quality performance goals for Building 35 (B35) being constructed by Webcor at the South San Francisco campus. Genentech and Webcor contracted with the Lawrence Berkeley National Laboratory (LBNL) to test building systems including lighting, lighting controls, shade fabric, and automated shading controls in LBNL’s new FLEXLAB facility. The goal of the testing is to ensure that the systems installed in the new office building will function in a way that reduces energy consumption and provides a comfortable work environment for employees.

  12. Achievement report (edition B) for fiscal 1999 on development of technology to manufacture coal gas for fuel cells. Studies by using pilot test facilities (Volumes for equipment fabrication and constructions, and trial run design); 1999 nendo seika hokokusho (B ban). Nenryo denchi you sekitan gas seizo gijutsu kaihatsu - Pilot setsubi ni yoru kenkyu (kisokoji kiki seisaku hen shiunten sekkei hen)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    With an objective to develop a coal gas manufacturing system for fuel cells, research and development has been performed on a oxygen-blown coal gasifier and researches on a technology to purify gases for fuel cells. This paper summarizes the achievements in fiscal 1999. The current fiscal year has performed, among other the pilot plant construction works, execution of the above-the-ground constructions for the operation center and compressor room building, construction of the cooling water tanks, and partial improvement of roads in the plant site. In the gasifier facilities, items of equipment were fabricated, some of the outsourced articles were procured, and the installations thereof were carried out. For the gas purifying equipment, installation of the gas analyzer room was executed. In the trial run design, discussions were given on the systematic improvements in the test items, the gas sampling procedures, the unit protecting interlock, and the facility protecting logic. For the trial run design, establishment has been implemented on the efficient and functional test plans by establishing priority on the tests to be executed, so that the development items demanded in the pilot test and research can be achieved within the limited test processes. (NEDO)

  13. STRUCTURAL SOLUTIONS AND SPECIAL FEATURES OF THE THERMAL PROTECTION ANALYSIS OF EXTERIOR WALLS OF BUILDINGS MADE OF AUTOCLAVED GAS-CONCRETE BLOCKS

    Directory of Open Access Journals (Sweden)

    Bedov Anatolij Ivanovich

    2012-10-01

    Full Text Available Relevant structural solutions, physical and mechanical characteristics, coefficients of thermal conductivity for exterior masonry walls made of autoclaved gas-concrete blocks are provided in the article. If a single-layer wall is under consideration, an autoclaved gas-concrete block is capable of performing the two principal functions of a shell structure, including the function of thermal protection and the bearing function. The functions are performed simultaneously. Therefore, the application of the above masonry material means the design development and erection of exterior walls of residential buildings noteworthy for their thermal efficiency. In the event of frameless structures, the height of the residential building in question may be up to 5 stories, while the use of a monolithic or a ready-made frame makes it possible to build high-rise buildings, and the number of stories is not limited in this case. If the average block density is equal to 400…500 kilograms per cubic meter, the designed wall thickness is to be equal to 400 mm. Its thermal resistance may be lower than the one set in the event of the per-element design of the thermal protection (Rreq = 3.41 м2 C/Watt, in Ufa, although it will meet the requirements of the applicable regulations if per-unit power consumption rate is considered.

  14. Design/installation and structural integrity assessment of Bethel Valley low-level waste collection and transfer system upgrade for Building 3092 (Central Off-Gas Scrubber Facility) at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    1995-01-01

    This document describes and assesses planned modifications to be made to the Building 3092 Central Off-Gas Scrubber Facility of the Oak Ridge National Laboratory, Oak Ridge, Tennessee. The modifications are made in responsible to the requirements of 40CFR264 Subpart J, relating to environmental protection requirements for buried tank systems. The modifications include the provision of a new scrubber recirculation tank in a new, below ground, lines concrete vault, replacing and existing recirculation sump that does not provide double containment. A new buried, double contained pipeline is provided to permit discharge of spent scrubber recirculation fluid to the Central Waste Collection Header. The new vault, tank, and discharge line are provided with leak detection and provisions to remove accumulated liquid. New scrubber recirculation pumps, piping, and accessories are also provided. This assessment concludes that the planned modifications comply with applicable requirements of 40CFR264 Subpart J, as set forth in Appendix F to the Federal Facility Agreement, Docket No. 89-04-FF, covering the Oak Ridge Reservation

  15. Solar hot water system installed at Quality Inn, Key West, Florida

    Science.gov (United States)

    1980-04-01

    The solar energy hot water system installed in the Quality Inn, Key West, Florida, which consists of four buildings is described. Three buildings are low-rise, two-story buildings containing 100 rooms. The fourth is a four-story building with 48 rooms. The solar system was designed to provide approximately 50 percent of the energy required for the domestic hot water system. The solar system consists of approximately 1400 square feet of flat plate collector, two 500 gallon storage tanks, a circulating pump, and a controller. Operation of the system was begun in April 1978, and has continued to date with only three minor interruptions for pump repair. In the first year of operation, it was determined that the use of the solar facility resulted in forty percent fuel savings.

  16. Relationship between Pipeline Wall Thickness (Gr. X60) and Water Depth towards Avoiding Failure during Installation

    Science.gov (United States)

    Razak, K. Abdul; Othman, M. I. H.; Mat Yusuf, S.; Fuad, M. F. I. Ahmad; yahaya, Effah

    2018-05-01

    Oil and gas today being developed at different water depth characterized as shallow, deep and ultra-deep waters. Among the major components involved during the offshore installation is pipelines. Pipelines are a transportation method of material through a pipe. In oil and gas industry, pipeline come from a bunch of line pipe that welded together to become a long pipeline and can be divided into two which is gas pipeline and oil pipeline. In order to perform pipeline installation, we need pipe laying barge or pipe laying vessel. However, pipe laying vessel can be divided into two types: S-lay vessel and J-lay vessel. The function of pipe lay vessel is not only to perform pipeline installation. It also performed installation of umbilical or electrical cables. In the simple words, pipe lay vessel is performing the installation of subsea in all the connecting infrastructures. Besides that, the installation processes of pipelines require special focus to make the installation succeed. For instance, the heavy pipelines may exceed the lay vessel’s tension capacities in certain kind of water depth. Pipeline have their own characteristic and we can group it or differentiate it by certain parameters such as grade of material, type of material, size of diameter, size of wall thickness and the strength. For instances, wall thickness parameter studies indicate that if use the higher steel grade of the pipelines will have a significant contribution in pipeline wall thickness reduction. When running the process of pipe lay, water depth is the most critical thing that we need to monitor and concern about because of course we cannot control the water depth but we can control the characteristic of the pipe like apply line pipe that have wall thickness suitable with current water depth in order to avoid failure during the installation. This research will analyse whether the pipeline parameter meet the requirements limit and minimum yield stress. It will overlook to simulate pipe

  17. Mules needed to install belt conveyor. Beumer executes major order in China

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2008-07-01

    Asia Cement Group, a major building material manufacturer headquartered in Taipeh (Taiwan), has built a new plant in the vicinity of Chengdu, the capital of Sichuan. Currently, a kiln with a capacity of 4200 tons per day is installed there. For moving the limestone from the quarry to the factory, located 30 km away, the Asia Cement Group has commissioned BEUMER with constructing a curved belt conveyor. The major order with a total volume of EUR 5 million includes design and installation of a 12.5-kilometre long system through rough mountainous terrain. (orig.)

  18. Regulating power for gas boilers in houses. Surplus power from wind power plants for natural gas boilers; Regulerkraft pae villakedelomraedet. Overskuds-el fra vindmoeller til naturgaskedler

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Michael; Frederiksen, Karsten V.

    2011-08-15

    The aim of the project is to clarify the potential development of a simple electric heating unit to gas installations in houses, so that natural gas for heating can be replaced with surplus wind power. The gas network in this way becomes an energy storage for power. In this preliminary project the aim is to estimate the value of these solutions and to verify in the lab, whether it is possible to establish and activate a simple and inexpensive electric heating unit on a typical gas boiler installation. In addition, it must be clarified whether it is possible to establish a simple communication with price signal from the balancing responsible. Based on the preliminary analyses and based on the electric heating unit, which is used in this project, it is estimated that there is a potential for the use of an electric heating unit on gas boilers in houses, and there is also a market, although there are limitations in relation to space and possibly also to the price. The price is estimated to be between 1,500 and 3,000 DKK per. installation (installed). However, this should be further investigated, including that the power balancing responsible /electricity trading companies assess the social value of using the electric heating unit as an element in the regulating power market. Regarding price signal, it is clear that communication opportunities are present at least with two of the balancing responsible companies, but it requires adaptation before a simple price signal to a gas boiler installation can be established. Price wise it is considered feasible. (LN)

  19. Flue gas emissions from gas-fired cogeneration units <25 MWe

    International Nuclear Information System (INIS)

    Nielsen, M.; Wit, J. de

    1997-01-01

    A total of 900 MW e gas driven combined heat and power (CHP) has now been established in Denmark based on gas engines and gas turbine units less than 25 MW e each. Of the 900 MW e approx. 750 MW e are based on gas engines. Biogas is used as fuel for some 32 MW e of these. Emission limits for NO x and CO are 650 mg/nm 3 (ref. 5% O 2 and electrical efficiency 30% LCV). There is at present no limit for unburned hydrocarbons (UHC) for gas engines or gas turbines. The average emission of unburned hydrocarbons for the Danish gas engine driven CHP units is equal to approx. 3,5% of the fuel used. It is the target of this report to provide the basis for evaluating the planned UHC limit and possible adjustments of the present limit for NO x emission. The average NO x emission from gas turbines slightly exceeds the NO x emission from gas engines. This is due to a number of older gas turbines. Modern gas turbines can achieve significantly lower NO x emission compared to engines. The NO x emission from biogas driven engines is significantly higher than that of natural gas driven units. This is mainly due to NO x -unfavourable engine settings and the use of older units, as there are no legislation concerning NO x emission for the majority of these biogas driven units. The emission of CO and UHC is lower from gas turbines than from gas engines. The NO x emission can be reduced by SCR Catalyst systems. In Denmark 3 gas engine installations use this commercially available technology. Oxidation catalyst for UHC reduction at modern gas engine installations has proven relatively unsuccesful in Denmark until now. Only limited reductions are achieved and many catalysts are toxificated in less than 100 hours of operation. However, long-term field testing of promising UHC reducing catalysts is now being made. UHC reduction by incineration is at the prototype stage. No such plant has yet been set up in Denmark. (Abstract Truncated)

  20. Energy Optimization Assessment at U.S. Army Installations: West Point Military Academy, NY

    Science.gov (United States)

    2008-09-01

    chillers to work unnecessarily more than needed. Other buildings had setpoints at different areas above 55 °F. Many buildings are air-conditioned and... optimal . The cost of 12.5 cents/KWh makes it unlikely, especially where steam adsorption chillers exist. 11.8.2 Solution Use the existing steam...ER D C/ CE R L TR -0 8 -1 4 Energy Optimization Assessment at U.S. Army Installations West Point Military Academy, NY David M

  1. Design Buildings Optimally: A Lifecycle Assessment Approach

    KAUST Repository

    Hosny, Ossama

    2013-01-01

    This paper structures a generic framework to support optimum design for multi-buildings in desert environment. The framework is targeting an environmental friendly design with minimum lifecycle cost, using Genetic Algorithms (Gas). GAs function through a set of success measures which evaluates the design, formulates a proper objective, and reflects possible tangible/intangible constraints. The framework optimizes the design and categorizes it under a certain environmental category at minimum Life Cycle Cost (LCC). It consists of three main modules: (1) a custom Building InformationModel (BIM) for desert buildings with a compatibility checker as a central interactive database; (2) a system evaluator module to evaluate the proposed success measures for the design; and (3) a GAs optimization module to ensure optimum design. The framework functions through three levels: the building components, integrated building, and multi-building levels. At the component level the design team should be able to select components in a designed sequence to ensure compatibility among various components, while at the building level; the team can relatively locate and orient each individual building. Finally, at the multi-building (compound) level the whole design can be evaluated using success measures of natural light, site capacity, shading impact on natural lighting, thermal change, visual access and energy saving. The framework through genetic algorithms optimizes the design by determining proper types of building components and relative buildings locations and orientations which ensure categorizing the design under a specific category or meet certain preferences at minimum lifecycle cost.

  2. Design/build/mockup of the Waste Isolation Pilot Plant gas generation experiment glovebox

    International Nuclear Information System (INIS)

    Rosenberg, K.E.; Benjamin, W.W.; Knight, C.J.; Michelbacher, J.A.

    1996-01-01

    A glovebox was designed, fabricated, and mocked-up for the WIPP Gas Generation Experiments (GGE) being conducted at ANL-W. GGE will determine the gas generation rates from materials in contact handled transuranic waste at likely long term repository temperature and pressure conditions. Since the customer's schedule did not permit time for performing R ampersand D of the support systems, designing the glovebox, and fabricating the glovebox in a serial fashion, a parallel approach was undertaken. As R ampersand D of the sampling system and other support systems was initiated, a specification was written concurrently for contracting a manufacturer to design and build the glovebox and support equipment. The contractor understood that the R ampersand D being performed at ANL-W would add additional functional requirements to the glovebox design. Initially, the contractor had sufficient information to design the glovebox shell. Once the shell design was approved, ANL-W built a full scale mockup of the shell out of plywood and metal framing; support systems were mocked up and resultant information was forwarded to the glovebox contractor to incorporate into the design. This approach resulted in a glovebox being delivered to ANL-W on schedule and within budget

  3. FY 1989 report on the results of the development of the entrained bed coal gasification power plant. Part 3. Fabrication/installation of pilot plant (Fabrication/installation drawings and fabrication/installation pictures - 2/2); 1989 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 3. Pilot plant seisaku suetsuke hen (Seisaku suetsukezu oyobi seisaku suetsuke shashin) (2/2)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-03-01

    For the purpose of establishing the technology of the integrated coal gasification combined cycle power generation, the fabrication, installation work, etc. were conducted of a 200t/d entrained bed coal gasification pilot plant, and fabrication/installation drawings and fabrication/installation pictures were summarized. In fabrication/installation drawings, drawings of the following were included: safety environmental equipment (total system diagram, layout scheme drawing, layout of electric room equipment, layout of control equipment room, etc.), total control system (structural drawing of the total control system, outline drawing of operation control panel, operator console of the integrated load pressure control system, operator console of the integrated sequential control system, central control panel, etc.), 66kV/6.9kV indoor switching station facilities (layout of equipment of indoor switching station facilities, outline drawing of the main transformer, outline drawing of cooler control panel of the main transformer, etc.), common facilities (total layout, diagram of the equipment cooling water pipe system, diagram of the fire-extinguishing water pipe system, etc.) In pictures of fabrication/installation, pictures of the following were included: gasifier equipment, gas refining facilities, gas turbine facilities, actual-pressure/actual-size combustor test equipment, safety environmental equipment, total control system, common facilities, etc. (NEDO)

  4. Operating a fuel cell using landfill gas

    Energy Technology Data Exchange (ETDEWEB)

    Trippel, C.E.; Preston, J.L. Jr.; Trocciola, J.; Spiegel, R.

    1996-12-31

    An ONSI PC25{trademark}, 200 kW (nominal capacity) phosphoric acid fuel cell operating on landfill gas is installed at the Town of Groton Flanders Road landfill in Groton, Connecticut. This joint project by the Connecticut Light & Power Company (CL&P) which is an operating company of Northeast Utilities, the Town of Groton, International Fuel Cells (IFC), and the US EPA is intended to demonstrate the viability of installing, operating and maintaining a fuel cell operating on landfill gas at a landfill site. The goals of the project are to evaluate the fuel cell and gas pretreatment unit operation, test modifications to simplify the GPU design and demonstrate reliability of the entire system.

  5. Development of a computer system for support and documentation of clearance of buildings of nuclear installations - 59278

    International Nuclear Information System (INIS)

    Winkler, Christoph; Woerlen, Stefan; Thierfeldt, Stefan; Schartmann, Frank

    2012-01-01

    Clearance of buildings of nuclear installations in Germany has to comply with general requirements laid down in Section 29 of the German Radiation Protection Ordinance (RPO; Strahlenschutzverordnung), clearance levels as stipulated in Table 1 of Annex III RPO and technical guidance given in the technical standard DIN 25457. Clearance procedures are usually proposed by the licensee and are made part of a decommissioning licence after appropriate review by the authorities. The clearance procedures consist of a radiological characterisation of the various parts of the buildings, a decontamination step if necessary, followed by measurements for checking the success of decontamination, and the actual decision measurements for demonstrating compliance with clearance levels. These three steps rely on various measurement methods, selected depending on the relevant radionuclides to be measured, like sampling with subsequent gamma spectrometry (and if necessary separate evaluation of beta and alpha emitting nuclides), measurements with surface contamination monitory and in situ gamma spectrometry. For a nuclear power plant, the number of samples taken during this procedure can easily reach a few 10, 000, while the number of single measurements can reach several 100, 000 single surface measurements and several 10, 000 measurements with in situ gamma spectrometry. This large number of data together with the correct interpretation according to the valid nuclide vector, the penetration depth of the contamination, the correction for radioactive decay etc have to be managed, which is a error-prone process if carried out manually or with insufficient support by customised software. For this reason, a versatile software tool has been developed by Brenk Systemplanung GmbH that supports the operator in all aspects of clearance of buildings, based on the extensive experience with various clearance procedures in nuclear power plants that Brenk Systemplanung has carried out in the past

  6. Experience in oil field processing of gas and condensate at the Shatlyk deposits

    Energy Technology Data Exchange (ETDEWEB)

    Dalmatov, V.V.; Chernikov, Ye.I.; Govorun, V.P.; Turevskiy, Ye.N.

    1983-01-01

    The operation of installations for preparing gas are analyzed, along with the operation of individual technological devices at the Shatlyk deposit, the basic things which hinder the support of the designed low temperature conditions are shown and recommendations for standardizing the operation of the technological installations are given. Experience in the operation of the gas preparation installations at the Shatlyk deposit is recommended for use in deposits being introduced into development.

  7. Empirical assessment of the Hellenic non-residential building stock, energy consumption, emissions and potential energy savings

    International Nuclear Information System (INIS)

    Gaglia, Athina G.; Balaras, Constantinos A.; Mirasgedis, Sevastianos; Georgopoulou, Elena; Sarafidis, Yiannis; Lalas, Dimitris P.

    2007-01-01

    Comprehensive information and detailed data for the non-residential (NR) building stock is rather limited, although it is the fastest growing energy demand sector. This paper elaborates the approach used to determine the potential energy conservation in the Hellenic NR building stock. A major obstacle that had to be overcome was the need to make suitable assumptions for missing detailed primary data. A qualitative and quantitative assessment of scattered national data resulted in a realistic assessment of the existing NR building stock and energy consumption. Different energy conservation scenarios and their impact on the reduction of CO 2 emissions were evaluated. Accordingly, the most effective energy conservation measures are: addition of thermal insulation of exposed external walls, primarily in hotels and hospitals; installation of energy efficient lamps; installation of solar collectors for sanitary hot water production, primarily in hotels and health care; installation of building management systems in office/commercial and hotel buildings; replacement of old inefficient boilers; and regular maintenance of central heating boilers

  8. The benefit of the Dutch Energy Investment Allowance (EIA) for high-efficiency installations in industrial buildings; EIA maakt hr-apparatuur voor bedrijfsgebouwen voordelig

    Energy Technology Data Exchange (ETDEWEB)

    De Boer, A. [ed.

    1998-02-01

    Gas-fired condensing appliances for space heating of industrial buildings are more expensive than appliances that do not show a high efficiency. In many cases, however, it is still cheaper to invest in condensing appliances. Not only because of lower exploitation costs, but also because of the ISO-high-efficiency subsidy regulation (`ISO-hr`), the energy investment allowance (EIA) and the energy conservation fund. The technologies that are eligible for the EIA are listed in the `Energielijst` (energy list) for 1998

  9. Comparative Study on the Cost of Building Public House Construction Using Red Brick and Interlock Brick Building Material in the City of Banda Aceh

    Science.gov (United States)

    Malahayati, Nurul; Hayati, Yulia; Nursaniah, Cut; Firsa, T.; Fachrurrazi; Munandar, Aris

    2018-05-01

    Red brick and interlocking brick are the building materials that are often used for wall installation work on houses construction. In the development of building materials technology and cost savings, interlocking brick can be alternative to replace red bricks. In Aceh Province, the use of interlocking bricks is less popular compared to other big cities in Indonesia. Interlocking brick is made from a mixture of clay, concrete sand and compacted cement and one of the environmentally friendly materials because it does not burn the process like red brick material. It is named interlocking brick because the installation method is locked together and it serves as a structural and partition wall of residential buildings. The aims of this study are to compare the cost of building a house in Banda Aceh City using red brick and interlock brick building materials. The data were obtained from interviews and questionnaires distributed to respondents who had built houses in Banda Aceh City. The results concluded that the house construction cost using interlock brick offer lower construction cost at comparable quality rather than using red brick.

  10. Analysis of energy economic renovation for historic wooden apartment buildings in cold climates

    International Nuclear Information System (INIS)

    Arumägi, Endrik; Kalamees, Targo

    2014-01-01

    Highlights: • Energy saving potential in historic wooden apartment buildings is up to 63%. • In historic wooden apartment buildings an economically viable energy saving level is 50%. • The largest energy saving potential lies in heat source and building service systems. • Of the building structures, insulation of the external wall has the highest potential. • New heating and ventilation systems must be installed to fulfill regulations limits. - Abstract: Buildings represent the largest sector of primary energy consumption and play a major role in saving energy and reducing greenhouse gas emissions. Our analysis of energy consumption and potential energy savings is based on field measurements, computer simulations and economic calculations. The average primary energy consumption (PE) of wooden apartment buildings was 331 kW h/(m 2 a) 83% higher than the limit 180 kW h/(m 2 a) set in national regulations for apartment buildings subject to major renovation. The studied buildings represent a high potential for energy savings. The renovation packages were compiled using different insulation measures, HVAC solutions and energy sources to achieve a 20–65% reduction of primary energy. For historic buildings, the renovation solutions that concentrate on the building envelope can be problematic due to the need to preserve cultural and architectural values. Our calculation results indicate that the cost optimal PE level is around 250 kW h/(m 2 a) and the point at which renovation packages recover expenses is around a PE level of 170 kW h/(m 2 a). In terms of the architectural appearance the point at which renovation packages recover expenses is around a PE level of 210 kW h/(m 2 a). We propose to set a different PE limit for historic wooden apartment buildings with an architectural appearance worth preserving

  11. Long-term autonomous volcanic gas monitoring with Multi-GAS at Mount St. Helens, Washington, and Augustine Volcano, Alaska

    Science.gov (United States)

    Kelly, P. J.; Ketner, D. M.; Kern, C.; Lahusen, R. G.; Lockett, C.; Parker, T.; Paskievitch, J.; Pauk, B.; Rinehart, A.; Werner, C. A.

    2015-12-01

    In recent years, the USGS Volcano Hazards Program has worked to implement continuous real-time in situ volcanic gas monitoring at volcanoes in the Cascade Range and Alaska. The main goal of this ongoing effort is to better link the compositions of volcanic gases to other real-time monitoring data, such as seismicity and deformation, in order to improve baseline monitoring and early detection of volcanic unrest. Due to the remote and difficult-to-access nature of volcanic-gas monitoring sites in the Cascades and Alaska, we developed Multi-GAS instruments that can operate unattended for long periods of time with minimal direct maintenance from field personnel. Our Multi-GAS stations measure H2O, CO2, SO2, and H2S gas concentrations, are comprised entirely of commercial off-the-shelf components, and are powered by small solar energy systems. One notable feature of our Multi-GAS stations is that they include a unique capability to perform automated CO2, SO2, and H2S sensor verifications using portable gas standards while deployed in the field, thereby allowing for rigorous tracking of sensor performances. In addition, we have developed novel onboard data-processing routines that allow diagnostic and monitoring data - including gas ratios (e.g. CO2/SO2) - to be streamed in real time to internal observatory and public web pages without user input. Here we present over one year of continuous data from a permanent Multi-GAS station installed in August 2014 in the crater of Mount St. Helens, Washington, and several months of data from a station installed near the summit of Augustine Volcano, Alaska in June 2015. Data from the Mount St. Helens Multi-GAS station has been streaming to a public USGS site since early 2015, a first for a permanent Multi-GAS site. Neither station has detected significant changes in gas concentrations or compositions since they were installed, consistent with low levels of seismicity and deformation.

  12. Modelling and dynamic simulation of processes with 'MATLAB'. An application of a natural gas installation in a power plant

    International Nuclear Information System (INIS)

    Gonzalez-Bustamante, J.A.; Sala, J.M.; Lopez-Gonzalez, L.M.; Miguez, J.L.; Flores, I.

    2007-01-01

    In this paper, it is proposed to incorporate the analysis of the dynamic performance of the process into the design and engineering stage of projects as a means of analysing and resolving this type of problem. The following contributions are made with this objective in mind:(a)The barriers in the way of dynamic analysis are identified. (b)Software tools which make dynamic analysis accessible during the design and engineering phase of the project are proposed. To achieve this goal, modelling and mathematical simulation are used, with the following features: *strict modelling of mass, momentum and energy conservation equations as well as state equations, and *utilisation of the 'Matlab-Simulink' package as the base-software tool. (c)The procedure and tool proposed for dynamic analysis during the design phase should enable these studies to be carried out at a reasonable cost and time for regular industrial projects, and not just for large research projects or nuclear power plants. To complete this paper, we apply our method to a natural gas installation in a power plant. The model is applied to study the transients of a natural gas supply line to a steam-electric power plant. The results of the model have been validated with the actual data on the boiler trip obtained from the distributed control system of a steam-electric power plant

  13. Substitution of petroleum liquefied gas for natural gas in a metallurgical industry: a case study; Substituicao de gas liquefeito de petroleo por gas natural em uma siderurgica: um estudo de caso

    Energy Technology Data Exchange (ETDEWEB)

    Pessoa, Isac Quintao; Miranda, Luciano Lellis; Fullin Junior, Benjamin; Rodrigues, Henrique de Castro; Manella, Roberto [Aperam South America, Timoteo, MG (Brazil). Utilidades e Eficiencia Energetica; Lins, Vanessa de Freitas Cunha [Universidade Federal de Minas Gerais (UFMG), Belo Horizonte, MG (Brazil). Dept. de Engenharia Quimica

    2011-12-21

    Minas Gerais is a State where there is no production of natural gas. Aiming to increase the consumption of natural gas in Minas Gerais, PETROBRAS increase the network of gas natural distribution in the State of Minas Gerais and the State concessionaire (GASMIG) installed the Project of Natural Gas Valley. The case study is associated to an enterprise that firmed contract for supplying of natural gas. The fuel to be substituted is the Liquefied Petroleum Gas and the results of the substitution were shown. The advantages of the substitution were related to costs, and environmental aspects with the reduction of CO{sub 2} production. The natural gas contains a lower content of impurities and is operated with higher safety than the petroleum liquefied gas. (author)

  14. Natural gas: An essential source of energy in the Romanian economy

    International Nuclear Information System (INIS)

    Coconea, G.

    1993-01-01

    The Romanian natural gas industry has existed since the early 1900s. The share of natural gas in Romania's current energy consumption is around 40%. The state gas company Romgaz operates ca 150 gas fields and 3,600 producing wells, but only 20% of annual production is being replaced by new discoveries. Declining gas production is caused by such factors as improper well completion, delayed workovers, water encroachment, and sand consolidation. Romgaz also transports imported natural gas from Russia and provides transportation services to natural gas importers in neighboring countries. The gas transmission network comprises ca 11,000 km of pipelines and 82,800 kW of installed compressor capacity. The distribution system supplies gas to over 2.5 million customers over some 15,000 km of pipeline. Future projects include expansion of production and increasing recoverable reserves, modernization of equipment, constructing an interconnecting pipeline with the Ukraine, installing a liquefied natural gas terminal on the Black Sea, rehabilitating the gas transmission grid, and installing supervisory control and data acquisition systems. The gas consumption pattern of 1990 (57% industrial, 31% power generation, 8% households) is expected to change with a substantial increase in household and commercial supplies, as well as replacement of gas-fired generation with hydroelectric and nuclear generation. A governmental restructuring strategy is being implemented to enhance oil and gas production, to improve operational efficiency of the sector, and to address environmental pollution. Components of the strategy are outlined

  15. Technical - Economic Research for Passive Buildings

    Science.gov (United States)

    Miniotaite, Ruta

    2017-10-01

    A newly constructed passive house must save 80 % of heat resources; otherwise it is not a passive house. The heating energy demand of a passive building is less than 15 kWh/m2 per year. However, a passive house is something more than just an energy-saving house. This concept involves sustainable, high-quality, valuable, healthy and durable construction. Features of a passive house: high insulation of envelope components, high-quality windows, good tightness of the building, regenerative ventilation system and elimination of thermal bridges. The Energy Performance of Buildings Directive (EPBD) 61 requires all new public buildings to become near-zero energy buildings by 2019 and will be extended to all new buildings by 2021. This concept involves sustainable, high-quality, valuable, healthy and durable construction. Foundation, walls and roofs are the most essential elements of a house. The type of foundation for a private house is selected considering many factors. The article examines technological and structural solutions for passive buildings foundation, walls and roofs. The technical-economic comparison of the main structures of a passive house revealed that it is cheaper to install an adequately designed concrete slab foundation than to build strip or pile foundation and the floor separately. Timber stud walls are the cheapest wall option for a passive house and 45-51% cheaper compared to other options. The comparison of roofs and ceilings showed that insulation of the ceiling is 25% more efficient than insulation of the roof. The comparison of the main envelope elements efficiency by multiple-criteria evaluation methods showed that it is economically feasible to install concrete slab on ground foundation, stud walls with sheet cladding and a pitched roof with insulated ceiling.

  16. The radon gas at the context of legislation on the quality of internal air in buildings - the Portuguese experience

    International Nuclear Information System (INIS)

    Pinto, Paulo G.A.N.; Pereira, Alcides J.S.C.; Neves, Luis J.P.F.

    2011-01-01

    Radon gas has been recognized as an important environmental risk factor, especially when found in high concentrations inside buildings, and is currently classified by the World Health Organization as a carcinogen type 1. In this context, there is legislation in Portugal since 2006 that sets limits to its concentration in indoor air. The aim of this work was to synthesize the existing legislation with focus on the sampling and analysis. Some statistical data about the measurements obtained in the Natural Radioactivity Laboratory, of the Department of Earth Sciences, of the University of Coimbra are presented, and discussed in the context of the National Energy Certification of Buildings System

  17. Software for simulation of nuclear simulation of nuclear installations

    International Nuclear Information System (INIS)

    Castaneda, J.O.; Ramos, L.M.; Arjona, O.; Rodriguez, L.

    1993-01-01

    The software is an instrument to build conceptual-type simulators of low, medium and full scale for used in nuclear installations. The system is composed by composed by two basic modules: one for the edition and the other for the simulation. The first one allows to prepare the information to simulate: mathematical model, technological design (fundamentally, operation board or mnemotechnical design), parameters to be shown, failures to be simulated

  18. Ethernet TCP/IP based building energy management system in a university campus in Saudi Arabia

    Energy Technology Data Exchange (ETDEWEB)

    Jomoah, Ibrahim M. [Department of Industrial Engineering, King Abdulaziz University Jeddah-21589 (Saudi Arabia); Kumar, R. Sreerama; Abdel-Shafi, Nabil Yassien [Saudi Electricity Company Chair for DSM and EE, Vice Presidency for Projects, King Abdulaziz University Jeddah 21589 (Saudi Arabia); Al-Abdulaziz, Abdulaziz Uthman M.; Obaid, Ramzy R. [Department of Electrical and Computer Engineering, King Abdulaziz University Jeddah-21589 (Saudi Arabia)

    2013-07-01

    This paper investigates the effectiveness of the Building Energy Management System (BMS) installed in the typical buildings in the main campus of King Abdulaziz University, Jeddah, in Saudi Arabia. As the domestic electricity and hence the oil consumption in Saudi Arabia is increasing at a very alarming rate compared to the other countries in the world, it is of paramount importance to resort to urgent measures in various industrial, commercial and residential sectors in the country to implement energy conservation measures. The major electrical load in the buildings in the University corresponds to air-handling units and lighting. If the Hajj period, during which millions of pilgrims visit Holy Makah, coincides with the summer, the electricity demand in the country further increases. Considering these issues, the university has taken initiatives to minimize energy consumption in the campuses through the various energy conservation measures. Towards this end, BMS is installed in a few of the typical classrooms and office buildings utilizing the existing campus Ethernet TCP/IP. The data analysis is performed over the period from April to September as it is the peak load period due to summer season. The effectiveness of the BMS in the minimization of the energy consumption in these buildings is established by comparing the results of data analysis with BMS against those before the installation of BMS over the peak period. The investigations reveal that appreciable saving in energy consumption can be achieved with the installation of BMS, the magnitude being dependent upon factors such as building characteristics, type of building, its utilization and period of use.

  19. Solar Heating and Cooling of Residential Buildings: Sizing, Installation and Operation of Systems.

    Science.gov (United States)

    Colorado State Univ., Ft. Collins. Solar Energy Applications Lab.

    This training course and a companion course titled "Design of Systems for Solar Heating and Cooling of Residential Buildings," are designed to train home designers and builders in the fundamentals of solar hydronic and air systems for space heating and cooling and domestic hot water heating for residential buildings. Each course, organized in 22…

  20. Progress on Enabling an Interactive Conversation Between Commercial Building Occupants and Their Building To Improve Comfort and Energy Efficiency: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Schott, M.; Scheib, J.; Long, N.; Fleming, K.; Benne, K.; Brackney, L.

    2012-06-01

    Many studies have reported energy savings after installing a dashboard, but dashboards provide neither individual feedback to the occupant nor the ability to report individual comfort. The Building Agent (BA) provides an interface to engage the occupant in a conversation with the building control system and the building engineer. Preliminary outcomes of the BA-enabled feedback loop are presented, and the effectiveness of the three display modes will be compared to other dashboard studies to baseline energy savings in future research.

  1. Low intensity natural gas infrared in sports centres; L'infrarouge a basse intensite au gaz naturel dans les centres sportifs

    Energy Technology Data Exchange (ETDEWEB)

    Lajoie, S. [Gaz Metropolitain, Montreal, PQ (Canada)

    2002-09-30

    Infrared devices are being employed more and more for heating buildings. They were traditionally used to heat large spaces higher than 3 metres, such as aviation hangars and industrial buildings. Natural gas infrared devices have found other applications, namely in sports centres, due in large part to the energy efficiency and the resulting comfort. There are three types of infrared devices: low intensity or low intensity tubes, high intensity, and catalytic infrared. Each type of device possesses specific characteristics and applications. For example, infrared tubes are used to uniformly heat a specific area. High intensity devices possess a more intense heat and concentrated in a confined space. Catalytic devices do not have flames, and they can be used in industrial drying processes and thermoforming. In the case of skating rinks, the use of low intensity natural gas infrared tubes is ideal. They reduce the crossed effects of ice cooling load and the spectators need for heat. This is due to infrared acting more on mass (spectators and bleachers) than ambient air. The author described the situation at the Val d'Or arena, Quebec where an energy saving project was initiated two years ago, involving the installation for one of the ice surfaces, of movement sensors to turn off infrared tubes when the rink is unoccupied. The payback period for such equipment is short. The case of the Soccerplex at Lachine, part of the larger City of Montreal, was also discussed. This sports centre comprises indoor soccer fields with 30 foot-high ceilings and large area covering 66,000 square feet (3 soccer fields). Once again, low intensity natural gas infrared tubes were installed and have proved successful.

  2. Analysis of the industrial treatment of gas

    Energy Technology Data Exchange (ETDEWEB)

    Shirkovskiy, A.I.; Belaya, N.N.; Nad, Z.

    1982-01-01

    Mathematical models, algorithms and programs are developed for calculation of the thermodynamic conditions of the operation of installations for low temperature separation, which made it possible, in an example of the gas condensate deposit of western Shatlyk, to predict the operation of low temperature separation installations to 1984.

  3. Design and installation manual for thermal energy storage

    Energy Technology Data Exchange (ETDEWEB)

    Cole, R L; Nield, K J; Rohde, R R; Wolosewicz, R M [eds.

    1979-02-01

    The purpose for this manual is to provide information on the design and installation of thermal energy storage in solar heating systems. It is intended for contractors, installers, solar system designers, engineers, architects, and manufacturers who intend to enter the solar energy business. The reader should have general knowledge of how solar heating systems operate and knowledge of construction methods and building codes. Knowledge of solar analysis methods such as f-chart, SOLCOST, DOE-1, or TRNSYS would be helpful. The information contained in the manual includes sizing storage, choosing a location for the storage device, and insulation requirements. Both air-based and liquid-based systems are covered with topics on designing rock beds, tank types, pump and fan selection, installation, costs, and operation and maintenance. Topics relevant to heating domestic water include safety, single- and dual-tank systems, domestic water heating with air- and liquid-based space heating system, and stand-alone domestic hot water systems. Several appendices present common problems with storage systems and their solutions, heat transfer fluid properties, heat exchanger sizing, and sample specifications for heat exchangers, wooden rock bins, steel tanks, concrete tanks, and fiberglass-reinforced plastic tanks.

  4. Evaluation of Factors that Influence Residential Solar Panel Installations

    Energy Technology Data Exchange (ETDEWEB)

    Morton, April M. [ORNL; Omitaomu, Olufemi A. [ORNL; Kotikot, Susan M. [ORNL; Held, Elizabeth L. [ORNL; Bhaduri, Budhendra L. [ORNL

    2018-03-01

    Though rooftop photovoltaic (PV) systems are the fastest growing source of distributed generation, detailed information about where they are located and who their owners are is often known only to installers and utility companies. This lack of detailed information is a barrier to policy and financial assessment of solar energy generation and use. To bridge the described data gap, Oak Ridge National Laboratory (ORNL) was sponsored by the Department of Energy (DOE) Office of Energy Policy and Systems Analysis (EPSA) to create an automated approach for detecting and characterizing buildings with installed solar panels using high-resolution overhead imagery. Additionally, ORNL was tasked with using machine learning techniques to classify parcels on which solar panels were automatically detected in the Washington, DC, and Boston areas as commercial or residential, and then providing a list of recommended variables and modeling techniques that could be combined with these results to identify attributes that motivate the installation of residential solar panels. This technical report describes the methodology, results, and recommendations in greater detail, including lessons learned and future work.

  5. Gas Hydrate Storage of Natural Gas

    Energy Technology Data Exchange (ETDEWEB)

    Rudy Rogers; John Etheridge

    2006-03-31

    Environmental and economic benefits could accrue from a safe, above-ground, natural-gas storage process allowing electric power plants to utilize natural gas for peak load demands; numerous other applications of a gas storage process exist. A laboratory study conducted in 1999 to determine the feasibility of a gas-hydrates storage process looked promising. The subsequent scale-up of the process was designed to preserve important features of the laboratory apparatus: (1) symmetry of hydrate accumulation, (2) favorable surface area to volume ratio, (3) heat exchanger surfaces serving as hydrate adsorption surfaces, (4) refrigeration system to remove heat liberated from bulk hydrate formation, (5) rapid hydrate formation in a non-stirred system, (6) hydrate self-packing, and (7) heat-exchanger/adsorption plates serving dual purposes to add or extract energy for hydrate formation or decomposition. The hydrate formation/storage/decomposition Proof-of-Concept (POC) pressure vessel and supporting equipment were designed, constructed, and tested. This final report details the design of the scaled POC gas-hydrate storage process, some comments on its fabrication and installation, checkout of the equipment, procedures for conducting the experimental tests, and the test results. The design, construction, and installation of the equipment were on budget target, as was the tests that were subsequently conducted. The budget proposed was met. The primary goal of storing 5000-scf of natural gas in the gas hydrates was exceeded in the final test, as 5289-scf of gas storage was achieved in 54.33 hours. After this 54.33-hour period, as pressure in the formation vessel declined, additional gas went into the hydrates until equilibrium pressure/temperature was reached, so that ultimately more than the 5289-scf storage was achieved. The time required to store the 5000-scf (48.1 hours of operating time) was longer than designed. The lower gas hydrate formation rate is attributed to a

  6. Leak testing of bubble-tight dampers using tracer gas techniques

    Energy Technology Data Exchange (ETDEWEB)

    Lagus, P.L. [Lagus Applied Technology, Inc., San Diego, CA (United States); DuBois, L.J. [Commonwealth Edison, Zion, IL (United States); Fleming, K.M. [NCS Corporation, Columbus, OH (United States)] [and others

    1995-02-01

    Recently tracer gas techniques have been applied to the problem of measuring the leakage across an installed bubble-tight damper. A significant advantage of using a tracer gas technique is that quantitative leakage data are obtained under actual operating differential pressure conditions. Another advantage is that leakage data can be obtained using relatively simple test setups that utilize inexpensive materials without the need to tear ducts apart, fabricate expensive blank-off plates, and install test connections. Also, a tracer gas technique can be used to provide an accurate field evaluation of the performance of installed bubble-tight dampers on a periodic basis. Actual leakage flowrates were obtained at Zion Generating Station on four installed bubble-tight dampers using a tracer gas technique. Measured leakage rates ranged from 0.01 CFM to 21 CFM. After adjustment and subsequent retesting, the 21 CFM damper leakage was reduced to a leakage of 3.8 CFM. In light of the current regulatory climate and the interest in Control Room Habitability issues, imprecise estimates of critical air boundary leakage rates--such as through bubble-tight dampers--are not acceptable. These imprecise estimates can skew radioactive dose assessments as well as chemical contaminant exposure calculations. Using a tracer gas technique, the actual leakage rate can be determined. This knowledge eliminates a significant source of uncertainty in both radioactive dose and/or chemical exposure assessments.

  7. Wifi-friendly building, enabling wifi signal indoor: an initial study

    Science.gov (United States)

    Suherman; Mubarakah, Naemah; Sagala, Romulo S.; Prayitno, Hendra

    2018-03-01

    The 802.11 network (wireless fidelity/WiFi) is the most common wireless infrastructure applied for internet access indoor. Widespread devices and installation simplicity make it better than similar technologies such as 802.16 and other 802.xx series. The access points are the most influential devices for indoor access. However, building indoor architectures contribute to the signal quality. Since WiFi installation in buildings becomes prevalent, the architecture should consider WiFi-friendliness into consideration. The more friendly the building to WiFi signal, the more efficient the 802.11 based wireless infrastructure. This paper present preliminary study how the building, specially the obstacle material, effects the WiFi signal propagation indoor. The study was performed by using ESP8266-based WiFi signal reader, to determine the impact indoor obstacles to WiFi signal propagation. The initial study shows that simple reflecting materials increase signal level about 1.14 dBm. WiFi-friendly building can be achieved by transforming building properties into signal interconnector. A simple photo frame with aluminium sheet insertion increase signal level on the second floor up to 6.56dBm.

  8. Background information to the installers guide for small scale mains connected PV

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    This report contains background information used by BRE, EA Technology, Halcrows and Sundog when compiling guidance for the UK's New and Renewable Energy Programme on the installation of small-scale photovoltaics (PV) in buildings. The report considers: relevant standards; general safety issues; fire and safety issues, including the fire resistance of PV modules; PV module ratings such as maximum voltage and maximum current; DC cabling; the DC disconnect; the DC junction box; fault analysis; general and AC side earthing; DC earthing; lightning and surge suppression; inverters; AC modules; AC systems; getting connection; mounting options; and installation issues.

  9. Studies for the requirements of automatic and remotely controlled shutoff valves on hazardous liquids and natural gas pipelines with respect to public and environmental safety

    Energy Technology Data Exchange (ETDEWEB)

    Oland, C. Barry [XCEL Engineering, Inc. (United States); Rose, Simon D. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States). Engineering Science and Technology Div.; Grant, Herb L. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States). Fabrication, Hoisting and Rigging Div.; Lower, Mark D. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States). Fabrication, Hoisting and Rigging Div.; Spann, Mark A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States). Facility Management Div.; Kirkpatrick, John R. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States). Computational Sciences and Engineering Div.; Sulfredge, C. David [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States). Computational Sciences and Engineering Div.

    2012-12-01

    This study assesses the effectiveness of block valve closure swiftness in mitigating the consequences of natural gas and hazardous liquid pipeline releases on public and environmental safety. It also evaluates the technical, operational, and economic feasibility and potential cost benefits of installing automatic shutoff valves (ASVs) and remote control valves (RCVs) in newly constructed and fully replaced transmission lines. Risk analyses of hypothetical pipeline release scenarios are used as the basis for assessing: (1) fire damage to buildings and property in Class 1, Class 2, Class 3, and Class 4 high consequence areas (HCAs) caused by natural gas pipeline releases and subsequent ignition of the released natural gas; (2) fire damage to buildings and property in HCAs designated as high population areas and other populated areas caused by hazardous liquid pipeline releases and subsequent ignition of the released propane; and (3) socioeconomic and environmental damage in HCAs caused by hazardous liquid pipeline releases of crude oil. These risk analyses use engineering principles and fire science practices to characterize thermal radiation effects on buildings and humans and to quantify the total damage cost of socioeconomic and environmental impacts. The risk analysis approach used for natural gas pipelines is consistent with risk assessment standards developed by industry and incorporated into Federal pipeline safety regulations. Feasibility evaluations for the hypothetical pipeline release scenarios considered in this study show that installation of ASVs and RCVs in newly constructed and fully replaced natural gas and hazardous liquid pipelines is technically, operationally, and economically feasible with a positive cost benefit. However, these results may not apply to all newly constructed and fully replaced pipelines because site-specific parameters that influence risk analyses and feasibility evaluations often vary significantly from one pipeline segment to

  10. Model of the containment building of Almaraz NPP and the system of recombiners PARs, with the GOTHIC code, for the study of the diffusion of combustible gases

    International Nuclear Information System (INIS)

    Garcia Gonzalez, M.; Huelamo, E.; Mazrtinez, M.; Perez, J. R.

    2014-01-01

    This paper presents the analysis of distribution of gases within the containment building carried out a simulation model with the code Thermo hydraulic GOTHIC, which has been evaluated based on passive autocatalytic recombiners gas control system. The model considers scenarios of severe accident with specific conditions that produce the most hydrogen generation rates. Intended to verify the effectiveness of the control system of gas expected to be installed in the Almaraz Nuclear power plant so that the number and location of recombiners equipment meets its function of preventing the formation of explosive atmospheres which impairs the integrity of the containment, reducing and limiting the concentration of combustible gases during the postulated accident. (Author)

  11. Decommissioning of offshore oil and gas installations

    International Nuclear Information System (INIS)

    Day, M.D.; Marks, M.H.

    1997-01-01

    A task facing the offshore oil and gas industry is the removal of about 7000 platforms. In this chapter, the legal framework for offshore platform decommissioning is first discussed. The various phases of abandonment are then described. The first and most critical of these is the planning phase which should be initiated years in advance when depletion plans for a field are recommended. Seven discrete activities are identified in the abandonment process itself and briefly discussed. These are: the permanent plugging and abandonment of non-productive well bores; pre-abandonment surveys and data gathering to gain knowledge about the platform and its condition; decommissioning; structure removal; disposal, recycle or reuse of platform components on or off shore; site clearance. (13 figures; 13 references) (UK)

  12. Maintenance management of gas turbine power plant systems ...

    African Journals Online (AJOL)

    Given the abundant availability of gas and the significant installed capacity of the electricity from Gas Turbine Power Systems; effective maintenance of Gas Turbine Power Plants in Nigeria could be the panacea for achieving regular power generation and supply. The study identified environmental impact on the machines, ...

  13. Solar heating, cooling, and domestic hot water system installed at Kaw Valley State Bank and Trust Company, Topeka, Kansas. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-11-01

    The building has approximately 5600 square feet of conditioned space. Solar energy is used for space heating, space cooling, and preheating domestic hot water (DHW). The solar energy system has an array of evacuated tube-type collectors with an area of 1068 square feet. A 50/50 solution of ethylene glycol and water is the transfer medium that delivers solar energy to a tube-in-shell heat exchanger that in turn delivers solar-heated water to a 1100 gallon pressurized hot water storage tank. When solar energy is insufficient to satisfy the space heating and/or cooling demand, a natural gas-fired boiler provides auxiliary energy to the fan coil loops and/or the absorption chillers. Extracts from the site files, specification references, drawings, and installation, operation and maintenance instructions are included.

  14. Design, Monitoring, and Validation of a High Performance Sustainable Building

    Science.gov (United States)

    2013-08-01

    ES-1 1.0 INTRODUCTION ...better quality in the overall building construction (e.g., plumbing the building correctly). 1 1.0 INTRODUCTION The U.S. DUSEPArtment of...al, 2006 U.S. Department of Defense (DoD) Directive 4170.11. 2009. Department of Defense Instruction- Installation Energy Mangement . December 11

  15. Building-Resolved CFD Simulations for Greenhouse Gas Transport and Dispersion over Washington DC / Baltimore

    Science.gov (United States)

    Prasad, K.; Lopez-Coto, I.; Ghosh, S.; Mueller, K.; Whetstone, J. R.

    2015-12-01

    The North-East Corridor project aims to use a top-down inversion methodology to quantify sources of Greenhouse Gas (GHG) emissions over urban domains such as Washington DC / Baltimore with high spatial and temporal resolution. Atmospheric transport of tracer gases from an emission source to a tower mounted receptor are usually conducted using the Weather Research and Forecasting (WRF) model. For such simulations, WRF employs a parameterized turbulence model and does not resolve the fine scale dynamics generated by the flow around buildings and communities comprising a large city. The NIST Fire Dynamics Simulator (FDS) is a computational fluid dynamics model that utilizes large eddy simulation methods to model flow around buildings at length scales much smaller than is practical with WRF. FDS has the potential to evaluate the impact of complex urban topography on near-field dispersion and mixing difficult to simulate with a mesoscale atmospheric model. Such capabilities may be important in determining urban GHG emissions using atmospheric measurements. A methodology has been developed to run FDS as a sub-grid scale model within a WRF simulation. The coupling is based on nudging the FDS flow field towards that computed by WRF, and is currently limited to one way coupling performed in an off-line mode. Using the coupled WRF / FDS model, NIST will investigate the effects of the urban canopy at horizontal resolutions of 10-20 m in a domain of 12 x 12 km. The coupled WRF-FDS simulations will be used to calculate the dispersion of tracer gases in the North-East Corridor and to evaluate the upwind areas that contribute to tower observations, referred to in the inversion community as influence functions. Results of this study will provide guidance regarding the importance of explicit simulations of urban atmospheric turbulence in obtaining accurate estimates of greenhouse gas emissions and transport.

  16. Self-reported neurological symptoms in relation to CO emissions due to problem gas appliance installations in London: a cross-sectional survey

    Directory of Open Access Journals (Sweden)

    Kreis Irene

    2008-07-01

    Full Text Available Abstract Background Previous research by the authors found evidence that up to 10% of particular household categories may be exposed to elevated carbon monoxide (CO concentrations from poor quality gas appliance installations. The literature suggests certain neurological symptoms are linked to exposure to low levels of CO. This paper addresses the hypothesis that certain self-reported neurological symptoms experienced by a householder are linked to an estimate of their CO exposure. Methods Between 27 April and 27 June 2006, 597 homes with a mains supply of natural gas were surveyed, mainly in old, urban areas of London. Qualified gas engineers tested all gas appliances (cooker, boiler, gas fire, and water heater and reported, according to the Gas Industry Unsafe Situations Procedure, appliances considered At Risk (AR, Immediately Dangerous (ID or Not to Current Standards (NCS. Five exposure risk categories were defined based on measurement of CO emitted by the appliance, its features and its use, with "high or very high" exposure category where occupants were considered likely to be exposed to levels greater than 26 ppm for one hour. The prevalence of symptoms at each level of exposure was compared with that at lowest level of exposure. Results Of the households, 6% were assessed as having a "high or very high" risk of exposure to CO. Of the individuals, 9% reported at least one neurological symptom. There was a statistically significant association between "high or very high" exposure risk to CO and self-reported symptoms compared to "no exposure" likelihood, for households not in receipt of benefit, controlling for "number of residents" and presence of pensioners, OR = 3.23 (95%CI: 1.28, 8.15. Risk ratios across all categories of exposure likelihood indicate a dose-response pattern. Those households in receipt of benefit showed no dose-response pattern. Conclusion This study found an association between risk of CO exposure at low concentration

  17. Evaluation of Aqua-Ammonia Chiller Technologies and Field Site Installation

    Energy Technology Data Exchange (ETDEWEB)

    Zaltash, Abdolreza [ORNL

    2007-09-01

    The Naval Facilities Engineering Service Center (NFESC) has sponsored Oak Ridge National Laboratory (ORNL) to review, select, and evaluate advanced, gas-fired, 5-ton, aqua-ammonia, chiller technologies. The selection criteria was that units have COP values of 0.67 or better at Air-conditioning and Refrigeration Institute (ARI) 95 F outdoor rating conditions, an active refrigerant flow control, and a variable-speed condenser fan. These features are expected to allow these units to operate at higher ambient temperatures (up to the maximum operating temperature of 110 F) with minimal degradation in performance. ORNL evaluated three potential manufacturers of advanced, gas-fired, 5-ton, aqua-ammonia chillers-Robur, Ambian, and Cooling Technologies. Unfortunately, Robur did not meet the COP requirements and Cooling Technologies could not deliver a unit to be tested at the U.S. Department of Energy (DOE)-ORNL environmental chamber testing facility for thermally activated heat pumps. This eliminated these two technologies from further consideration, leaving only the Ambian chillers for evaluation. Two Ambian chillers were evaluated at the DOE-ORNL test facility. Overall these chillers operated well over a wide range of ambient conditions with minimal degradation in performance due to several control strategies used such as a variable speed condenser fan, a modulating burner, and active refrigerant flow control. These Ambian pre-commercial units were selected for installation and field testing at three federal facilities. NFESC worked with ORNL to assist with the site selection for installation and evaluation of these chillers. Two sites (ORNL and Naval Surface Warfare Center [NSWC] Corona) had a single chiller unit installed; and at one site (Naval Amphibious Base [NAB] Little Creek), two 5-ton chillers linked together were installed to provide 10 tons of cooling. A chiller link controller developed under this project was evaluated in the field test at Little Creek.

  18. Energy consumption of building related energy functions in houses and utility buildings

    International Nuclear Information System (INIS)

    Van Arkel, W.G.; Jeeninga, H.; Menkveld, M.; Ruijg, G.J.

    1999-11-01

    This study investigates the development of the use of electricity and natural gas in houses and buildings until 2010. For the domestic sector it is studied how much energy is used now and will be used in future for heating, for production of hot water, for lighting, for ventilation and for cooling. For different sorts of buildings (shops, hospitals, schools, offices, restaurants) it has been determined how much gas will be used for heating, for hot water production and by humidifiers. It has also been calculated how much electricity will be used for lighting, ventilation, cooling and humidifying. The influence of higher and lower energy prices on the amount of use has been studied. Experts have been asked to give their opinions on trends in the use of buildings and the role of new technologies. The influence of these ideas on the use of energy has been calculated. 44 refs

  19. Solar heating system installed at Jackson, Tennessee. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-10-01

    The solar energy heating system installed at the Coca-Cola Bottling Works in Jackson, Tennessee is described. The system consists of 9480 square feet of Owens-Illinois evacuated tubular solar collectors with attached specular cylindrical reflectors and will provide space heating for the 70,000 square foot production building in the winter, and hot water for the bottle washing equipment the remainder of the year. Component specifications and engineering drawings are included. (WHK)

  20. Analysis of potential energy, economic and environmental savings in residential buildings: Solar collectors combined with microturbines

    International Nuclear Information System (INIS)

    Suárez, I.; Prieto, M.M.; Fernández, F.J.

    2013-01-01

    Highlights: ► Centralization of energy systems for a group of buildings improves profitability. ► Thermal solar systems are economically interesting even in low radiation locations. ► Regulations currently in force determine the feasibility of high efficiency energy systems. - Abstract: This paper presents an analysis of a combined solar-cogeneration installation for providing energy services in a set of four residential buildings. Different configurations as regards the number of collectors and their orientation, the number of buildings grouped together, the type of microturbines used in the cogeneration system and their daily and annual operating period are studied from the legal, economic and environmental perspectives. The installation that fulfils the minimum requirements of the solar system coverage and the cogeneration system efficiency currently in force, and simultaneously leads to the highest energy, economic and environmental savings is the one that integrates both technologies and centralises the installation for the four buildings together. A payback period lower than 8 years is obtained that makes this investment recommendable, but it is also concluded that maintaining the existing subsidies for these technologies and lowering the costs of the equipment, are essential factors to ensure the feasibility of this type of installations

  1. Design, Fabrication, Installation and Commissioning of the Helium Refrigeration system Supporting Superconducting Radio Frequency Testing at Facility for Rare Isotope Beams at Michigan State University

    Science.gov (United States)

    Casagrande, F.; Fila, A.; Nguyen, C.; Tatsumoto, H.

    2017-12-01

    The Facility for Rare Isotope Beams (FRIB) will be a scientific user facility for the Office of Nuclear Physics in the U.S. Department of Energy Office of Science (DOE-SC). The FRIB linear accelerator (LINAC) will be comprised of cryomodules each with multiple Superconducting Radio Frequency (SRF) cavities operating at 2 K. A helium refrigeration system was designed, fabricated, installed and commissioned in the SRF high bay building to test and certify these cavities and cryomodules before installation in the FRIB LINAC tunnel. The helium refrigeration system includes a helium refrigerator which has nominal capacity of 900 W at 4 K, 5000 L liquid helium storage Dewar, helium gas storage, two room temperature vacuum pumps capable of 2.5 g/s each for 2 K testing, purifier, purifier recovery compressor, and the distribution system for liquid nitrogen and helium. The helium refrigeration system is now operational supporting three below grade cavity testing Dewars and one cryomodule testing bunker meeting the required throughput of 1 cavity per day.

  2. The inspection of (collective) tapwater installations in 2009. Progress report; De controle van collectieve leidingwaterinstallaties in 2009. Voortgang controletaak

    Energy Technology Data Exchange (ETDEWEB)

    Dik, H.H.J.

    2011-02-15

    For the first time since 2004, less newly build collective tap water installations show shortcomings. This is true for both the first inspection and the follow-up inspections preformed by the water companies. This seems to indicate a break in the trend of previous years where less newly build installations pass inspection without shortcomings. Still, one-third of the inspected installations do not comply with legionella regulations when first inspected. These non-compliances can be the cause of high to very high risk of contamination of the installation or the public mains system. These conclusions are drawn from the inspections preformed in 2009 by the drinking water companies in newly build and existing installations. By order of the Dutch Ministry of Infrastructure and the Environment and the VROM Inspectorate, the Institute for Public Health and the Environment of the Netherlands (RIVM) compile a yearly report since 2004 on the inspection of tap water installations. In 2009 more than 47.000 newly build and existing installations were inspected. The inspections have found and resolved more than 8000 situations of high to very high risk for public health. In existing installations, the number of non-compliance found at first inspections has decreased over the years. At the second inspection of installations that do not comply, the number of non-complying installations increases. The cause of this trend is unknown, and should be investigated. Only a quarter of the installations that must comply with special regulations for the prevention of Legionella (high-priority installations like hospitals, swimming pools, etc.) comply at first inspection. Starting from 2009, these installations are inspected according to a special intervention strategy. It is still too early to see results from this strategy. [Dutch] Voor het eerst sinds 2004 vertonen minder collectieve leidingwaterinstallaties in nieuwbouw gebreken. Dit geldt voor zowel de eerste (basis)controle als de

  3. A new fire alarm system for electrical installations

    CERN Document Server

    Pietersen, A H

    1978-01-01

    Fires in electrical installations are considered to develop in four phases - initiation, smouldering, flame formation and heat development. Cables are among the more sensitive components, with working temperatures around 50 degrees C and fire detection at 70 degrees C. Conventional alarms include smoke detectors. The new technique described uses microcapsules containing powder forming a gas of the Freon type after diffusion. A typical microcapsule loses 4% per year and has a natural life of 10 years. Fabrication methods are described. Detection is by gas concentration, with a sensitivity of 1 to 10 ppm, or by acoustic methods with microphones to pick up the sound of fractures. Pressure/temperature characteristics of various types of Freon mixtures commercially available are given in graphical form.

  4. Recovery of krypton-85 from dissolver off-gas streams

    International Nuclear Information System (INIS)

    Law, J.P.; Lamb, K.M.

    1988-01-01

    The Rare Gas Plant at the Idaho Chemical Processing Plant Recovers fission product krypton and xenon from dissolver off gas streams. Recently the system was upgraded to allow processing of hydrogen rich dissolver off-gas streams. A trickle bed hydrogen recombiner was installed and tested. The Rare Gas Plant can now safely process gas streams containing up to 80% hydrogen

  5. Effectiveness of the Vertical Gas Ventilation Pipes for Promoting Waste Stabilization in Post-Closure Phase

    Directory of Open Access Journals (Sweden)

    Yasumasa Tojo

    2015-06-01

    Full Text Available To make inside of the municipal solid waste (MSW landfill aerobic as much as possible is thought to be preferable for promoting waste stabilization, reducing pollutant's load in leachate, minimizing greenhouse gas emission and shortening post-closure-care period. In Japan, installation of semi-aerobic landfill structure has widely spread in order to promote waste stabilization in MSW landfill from 1980s. In semi-aerobic landfill structure, outlet of main leachate collection pipe is opened to atmosphere. Heat generated by aerobic degradation of waste causes natural convection and natural aeration arises from the outlet of leachate collection pipe to the gas vents. It is so-called stack effect. This air flow is thought to be effective for purifying leachate flowing through drainage layer and leachate collection pipes. And it is also thought to be contributing to expanding aerobic region in waste layer in landfill. Recently, measures attempting the promotion of waste stabilization are taken at several landfills at where stabilization of waste delays, in which many vertical gas vents are newly installed and close structure to semi-aerobic landfill is created. However, in many cases, these gas vents are not connected to leachate collection pipes. Many vertical gas vents are just installed without scientific proof regarding whether they can contribute for waste stabilization. In this study, how such installation of gas vents is effective for waste stabilization and aerobization of waste layer was discussed by numerical analysis. In numerical analysis, heat transfer, gas movement by pressure, gas diffusion, biological degradation of organic matter, and heat generation by biodegradation were taken into account. Simulations were carried out by using the general purpose simulator of finite element method. Three types of landfill structure were assumed. As the results, the following information were obtained. In dig-down type landfill, installation of gas

  6. Building systems. Applications - technologies - demands; Vernetzte Gebaeudesysteme. Anwendungen - Technologien - Forderungen

    Energy Technology Data Exchange (ETDEWEB)

    Moehl, U. [JOHNSON CONTROLS JCI Regelungstechnik GmbH, Essen (Germany)

    2003-09-01

    The dream of the 'Smart Home' or 'Intelligent Building' seems to become reality. Building users can operate their building systems from anywhere inside and outside the building based upon proven technologies. Service providers have the opportunity to take partial or full responsibility for building systems, facility management and even care taking in an effective way. Besides all the success, there are still many hurdles that need to be managed during planning, installation and operation. This paper provides inside information on above-mentioned subject and possible areas of concern. (orig.)

  7. Highlight of Grid-connected PV systems in administrative buildings in Egypt

    Directory of Open Access Journals (Sweden)

    Dina Said

    2017-03-01

    Full Text Available Solar energy applications are becoming increasingly common in Egypt. The abundant sunshine in Egypt, as well as the increasing competitiveness of solar energy systems including- but not limited to photovoltaic (PV, – predicts that these technologies could be weighed to be raised in Egypt.PV systems are installed on roof tiles or other parts of building structures to supplement grid utility, reduce electric bills, and provide emergency back–up energy. Moreover, they simultaneously reduce significant amounts of CO2 emissions. It is foreseen, a number of residential and public buildings in Egypt are using solar power to cut electric utility bills significantly. The approximately payback period to recover the investment costs for PV systems is up to about 5 years.  In addition, it is more economical to use PV system than grid utility systems. The two components that determine the total initial price of a grid- connected PV system are the modules and the balance of systems (BOS. The BOS includes different components such as mounting frames, inverters and site- specific installation hardware.The Government of Egypt (GOE has endorsed the deployment of PV systems through three approaches. It started with a prime minister decree to install PV projects on one-thousand of the governmental buildings. This was followed by as an initiative called "Shamsk ya Masr", and finally the Feed-in Tariff (FiT projects.Following the prime minster decree the Egyptian Electricity Holding Company (EEHC and its affiliated companies took the lead to install PV systems at the top roof of their administrative buildings and interconnect these systems to the electricity network where the suitable locations have been selected for mounting them. About 90 PV systems have been already mounted with about a capacity of 9 MW. On the other hand, "Shamsk ya Masr" has considered energy efficiency (EE so as to complement the PV systems, which will be installed on administrative

  8. Selection tests of rubber coatings for the purpose of washing towers and other components in flue gas desulfurization installations. Selectietesten van rubberdeklagen ten behoeve van wastorens en andere componenten in rookgasontzwavelingsinstallaties; Deel 1

    Energy Technology Data Exchange (ETDEWEB)

    Schipper, B.A.; Van Manen, J. (KEMA Inspecties en Materialen, Arnhem (Netherlands))

    1993-01-01

    It has appeared that the service life of chloroprene-based rubber coatings in flue gas desulfurization (FGD) installations in coal-fired power plants in the Netherlands is short. A number of rubber coating types, applied in washing towers, pipelines, pumps and boilers of FGD installations, is tested on a laboratory scale. Use has been made of the KEMA-developed accelerated test method, the Delta-T-Tube Test. In this test a rubber foil is attached to the outside of a tube. The tube is internally cooled and the outside is exposed to a test medium. Also use has been made of the KEMA-FGD test facility to expose the pipes in the washing tank and in the flue gas canal. Plates, coated with a rubber foil, are tested in so-called Atlas cells. The tubes and the plates were controlled for blister and crack formation and for erosion. Thermal analyses methods and mechanical tests were carried out to characterize the plates and the tubes before and after the exposures. It is concluded that butyl-based rubbers show better results than chloroprene-based rubbers

  9. Analysis of Marine Corps Renewable Energy Planning to Meet Installation Energy Security Requirements

    Science.gov (United States)

    2013-12-03

    monitoring grid interruptions at each installation and their impact on operations. Collecting interruption data will assist in obtaining an accurate...zero energy status is within reach if Miramar implements the recommended measures, replaces all remaining natural gas with biogas , and completely

  10. Natural Gas Versus Nuclear New Build Versus Life Extension

    International Nuclear Information System (INIS)

    Barron, B.

    2013-01-01

    Proven natural gas reserves and production in the USA have continued to increase in recent years. This is due to the exploration of shale formations and the expanded use of hydraulic fracking technology. Looking forward, we can expect that high crude oil prices will sustain natural gas production at current levels (approximately 25% of natural gas production in the USA is a by-product of crude oil drilling), and the natural gas liquid cuts are priced with crude oil. Continued drilling in the near term for natural gas is required by lease obligations and by commitments to investors

  11. Gas chromatographic study of degradation phenomena concerning building and cultural heritage materials

    International Nuclear Information System (INIS)

    Metaxa, E.; Agelakopoulou, T.; Bassiotis, I.; Karagianni, Ch.; Roubani-Kalantzopoulou, F.

    2009-01-01

    Air pollution influences all aspects of social and economical life nowadays. In order to investigate the impact of air pollution on materials of works of art, the method of Reversed Flow-Inverse Gas Chromatography has been selected. The presence of various atmospheric pollutants is studied on marbles, oxides-building materials and samples of authentic statues from the Greek Archaeological Museums of Kavala and of Philippi. The method leads to the determination of several physicochemical quantities and the characterization of the heterogeneous surfaces of these solids. Moreover, the influence of a second pollutant (synergistic effect) is examined. The structure, the properties and the behavior of the materials are examined by X-Ray Diffraction, Scanning Electron Microscopy and Raman Spectroscopy. Therefore, the precise measurement of the above mentioned quantities form the scientific basis for elucidation of the mechanism of the whole phenomenon of the degradation, thus providing a scientific platform to conservation procedures.

  12. Production costs: U.S. gas turbine ampersand combined-cycle power plants

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This fourth edition of UDI's gas turbine O ampersand M cost report gives 1991 operation and maintenance expenses for over 450 US gas turbine power plants. Modeled on UDI's popular series of O ampersand M cost reports for US steam-electric plants, this report shows operator and plant name, plant year-in-service, installed capacity, 1991 net generation, total fuel expenses, total non-fuel O ampersand M expenses, total production costs, and current plant capitalization. Coverage includes over 90 percent of the utility-owned gas/combustion turbine and combined-cycle plants installed in the country

  13. Analyzing the Impact of Residential Building Attributes, Demographic and Behavioral Factors on Natural Gas Usage

    Energy Technology Data Exchange (ETDEWEB)

    Livingston, Olga V.; Cort, Katherine A.

    2011-03-03

    study attempts to bridge that gap by analyzing behavioral data and investigate the applicability of additive nonparametric regression to this task. This study evaluates the impact of 31 regressors on residential natural gas usage. The regressors include weather, economic variables, demographic and behavioral characteristics, and building attributes related to energy use. In general, most of the regression results were in line with previous engineering and economic studies in this area. There were, however, some counterintuitive results, particularly with regard to thermostat controls and behaviors. There are a number of possible reasons for these counterintuitive results including the inability to control for regional climate variability due to the data sanitization (to prevent identification of respondents), inaccurate data caused by to self-reporting, and the fact that not all relevant behavioral variables were included in the data set, so we were not able to control for them in the study. The results of this analysis could be used as an in-sample prediction for approximating energy demand of a residential building whose characteristics are described by the regressors in this analysis, but a certain combination of their particular values does not exist in the real world. In addition, this study has potential applications for benefit-cost analysis of residential upgrades and retrofits under a fixed budget, because the results of this study contain information on how natural gas consumption might change once a particular characteristic or attribute is altered. Finally, the results of this study can help establish a relationship between natural gas consumption and changes in behavior of occupants.

  14. LHCb Dockerized Build Environment

    Science.gov (United States)

    Clemencic, M.; Belin, M.; Closier, J.; Couturier, B.

    2017-10-01

    Used as lightweight virtual machines or as enhanced chroot environments, Linux containers, and in particular the Docker abstraction over them, are more and more popular in the virtualization communities. The LHCb Core Software team decided to investigate how to use Docker containers to provide stable and reliable build environments for the different supported platforms, including the obsolete ones which cannot be installed on modern hardware, to be used in integration builds, releases and by any developer. We present here the techniques and procedures set up to define and maintain the Docker images and how these images can be used to develop on modern Linux distributions for platforms otherwise not accessible.

  15. Installing Omeka

    Directory of Open Access Journals (Sweden)

    Jonathan Reeve

    2016-07-01

    Full Text Available Omeka.net is a useful service for Omeka beginners, but there are a few reasons why you might want to install your own copy of Omeka. Reasons include: * Upgrades. By installing Omeka yourself, you can use the latest versions of Omeka as soon as they’re released, without having to wait for Omeka.net to upgrade their system. * Plugins and themes. You can install any plugin or theme you want, without being restricted to those provided by Omeka.net. * Customizations. You can buy a custom domain name, and customize your code to achieve your desired functionality. * Control. You have control over your own backups, and you can update the server yourself so that its security is always up-to-date. * Price. There are many low-cost Virtual Private Servers (VPSs now, some of which cost only $5 per month. * Storage. Many shared hosting providers now offer unlimited storage. This is useful if you have a large media library. In this tutorial, we’ll be entering a few commands on the command line. This tutorial assumes no prior knowledge of the command line, but if you want a concise primer, consult the Programming Historian introduction to BASH. There are other ways of installing Omeka, of course, some using exclusively GUI tools. Some hosting providers even offer “one-click installs” via their control panels. Many of those methods, however, will install older versions of Omeka which are then harder to upgrade and maintain. The method outlined below may not be the easiest way to install Omeka, but it will give you some good practice with using the command line, which is a skill that will be useful if you want to manually upgrade your install, or manually install other web frameworks. (For example, this installation method is very similar to WordPress’s “Five-Minute Install”. There are four steps to this process, and it should take about an hour.

  16. Drinking Water Quality in Hospitals and Other Buildings ...

    Science.gov (United States)

    Drinking water quality entering large buildings is generally adequately controlled by the water utility, but localized problems may occur within building or “premise” plumbing. Particular concerns are loss of disinfectant residual and temperature variability, which may enhance pathogen activity and metallic corrosion. Disinfection systems are available to building managers and are being installed in a variety of commercial buildings (hospitals, hotels, office buildings.) Yet our understanding of such additional treatment and of how to monitor end water quality at these buildings is limited. This class lecture will discuss challenges in maintaining acceptable water quality in hospitals, schools and other buildings. To give a lecture to a class of graduate students (ENVE 6054: Physical/Chemical Processes for Water Quality Control) at the University of Cincinnati, by presenting past research projects.

  17. Heritage plaza parking lots improvement project- Solar PV installation

    Energy Technology Data Exchange (ETDEWEB)

    Hooks, Todd [Agua Caliente Indian Reservation, Palm Springs, CA (United States)

    2017-03-31

    The Agua Caliente Band of Cahuilla Indians (ACBCI or the “Tribe”) installed a 79.95 kW solar photovoltaic (PV) system to offset the energy usage costs of the Tribal Education and Family Services offices located at the Tribe's Heritage Plaza office building, 90I Tahquitz Way, Palm Springs, CA, 92262 (the "Project"). The installation of the Solar PV system was part of the larger Heritage Plaza Parking Lot Improvements Project and mounted on the two southern carport shade structures. The solar PV system will offset 99% of the approximately 115,000 kWh in electricity delivered annually by Southern California Edison (SCE) to the Tribal Education and Family Services offices at Heritage Plaza, reducing their annual energy costs from approximately $22,000 annually to approximately $200. The total cost of the proposed solar PV system is $240,000.

  18. Physical Protection Study of the Radio metallurgy Installation Using SAVIComputer Program

    International Nuclear Information System (INIS)

    Pinitoyo, Andreas

    2000-01-01

    Based on IAEA Recommendation on INFCIR/225/Rev.3 (The Physical Protectionof Nuclear Material), a nuclear installation shall have physical protectionsystem for protection or being secure on sabotage activities in theinstallation and thieve of nuclear materials. The recommendation states therequirements for physical protection of nuclear materials usage, transit andstorage. Radio metallurgy Installation of the Fuel Element and ReprocessingDevelopment Center (BATAN) at Serpong is a nuclear installation for researchon post irradiation of high radioactive spent fuel element, its processingand storage. The installation has risk on threat of a sabotage, which isdominant than thieve. The RMI building was designed and constructed ofphysical protection components and have been integrated with the BATAN Safetyand Security System and the Security Guards functions to be PhysicalProtection System for the RMI. By using the SAVI Computer Program with inputdata from the existing standards, assumptions for detection possibility,delay and response, that will result the probability of interruptions of theworst adversary paths PI = 0.1. These mean that the physical protectionsystems of the RMI shall be upgraded and improved in order to be reliable orbetter if the most of paths to the target PI = 1.0. (author)

  19. Ground tests of 120 kW(heat) biomass fired gasifier diesel installation

    Energy Technology Data Exchange (ETDEWEB)

    Zyssin, L.V.; Maronet, I.J.; Morshin, V.N. [Energotechnology Ltd., St. Petersburg (Russian Federation)

    1996-12-31

    For the 1 MW and less power range diesel gasifier power plants could be considered as one of the main energy sources. The brief information about works carried out in Russia according to this direction is presented. Data of preliminary tests for gas diesel installations are presented. (orig.)

  20. Ground tests of 120 kW(heat) biomass fired gasifier diesel installation

    Energy Technology Data Exchange (ETDEWEB)

    Zyssin, L V; Maronet, I J; Morshin, V N [Energotechnology Ltd., St. Petersburg (Russian Federation)

    1997-12-31

    For the 1 MW and less power range diesel gasifier power plants could be considered as one of the main energy sources. The brief information about works carried out in Russia according to this direction is presented. Data of preliminary tests for gas diesel installations are presented. (orig.)

  1. Evaluating the financial efficiency of energy and water saving installations in passive house

    Science.gov (United States)

    Stec, Agnieszka; Mazur, Aleksandra; Słyś, Daniel

    2017-11-01

    The article contains the outcomes of the Life Cycle Cost analysis for alternative energy and water sources utilized in passive buildings. The solutions taken into account included: heat pumps, solar collectors, photovoltaic panels, Drain Water Heat Recovery units, Rain Water Harvesting Systems and Greywater Recycling Systems. In addition, air pollution emission reduction was also calculated for all the installation variants analyzed. The analysis have shown that the systems under consideration could serve as alternatives for traditional installations. Their use has resulted in reductions in the consumption of fossil fuels and natural water resources, thus contributing to environmental improvements.

  2. Evaluating the financial efficiency of energy and water saving installations in passive house

    Directory of Open Access Journals (Sweden)

    Stec Agnieszka

    2017-01-01

    Full Text Available The article contains the outcomes of the Life Cycle Cost analysis for alternative energy and water sources utilized in passive buildings. The solutions taken into account included: heat pumps, solar collectors, photovoltaic panels, Drain Water Heat Recovery units, Rain Water Harvesting Systems and Greywater Recycling Systems. In addition, air pollution emission reduction was also calculated for all the installation variants analyzed. The analysis have shown that the systems under consideration could serve as alternatives for traditional installations. Their use has resulted in reductions in the consumption of fossil fuels and natural water resources, thus contributing to environmental improvements.

  3. 46 CFR 184.240 - Gas systems.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Gas systems. 184.240 Section 184.240 Shipping COAST... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Cooking and Heating § 184.240 Gas systems. Cooking systems... requirements: (a) The design, installation and testing of each LPG system must meet ABYC A-1, “Marine Liquefied...

  4. Laboratory demonstration of lightning strike pattern on different roof tops installed with Franklin Rods

    Science.gov (United States)

    Ullah, Irshad; Baharom, MNR; Ahmed, H.; Luqman, HM.; Zainal, Zainab

    2017-11-01

    Protection against lightning is always a challenging job for the researcher. The consequences due to lightning on different building shapes needs a comprehensive knowledge in order to provide the information to the common man. This paper is mainly concern with lightning pattern when it strikes on the building with different shape. The work is based on the practical experimental work in high voltage laboratory. Different shapes of the scaled structures have been selected in order to investigate the equal distribution of lightning voltage. The equal distribution of lightning voltage will provide the maximum probability of lightning strike on air terminal of the selected shapes. Building shapes have a very important role in lightning protection. The shapes of the roof tops have different geometry and the Franklin rod installation is also varies with changing the shape of the roof top. According to the ambient weather condition of Malaysia high voltage impulse is applied on the lightning rod installed on different geometrical shape. The equal distribution of high voltage impulse is obtained as the geometry of the scaled structure is identical and the air gap for all the tested object is kept the same. This equal distribution of the lightning voltage also proves that the probability of lightning strike is on the corner and the edges of the building structure.

  5. Manure gas

    Energy Technology Data Exchange (ETDEWEB)

    Carre, I

    1948-11-01

    Descriptions are given of several batch digesters: the Algerian, Salubra, Betur, Baudot-Hardoll and Ofla, and Somagaz designs. Sketches of two Ducellier and Isman designs are given with a photograph of an installation consisting of four contiguous, rectangular concrete tanks. There are short explanations of the fundamentals and economics of the process, and of the use of the gas.

  6. Law guide for photovoltaic installations: Array installation; Connecting the grid; Financing; The new legal regime implemented in 2011; Is green taxing still so green?; Which judge will bring the light?: Reactions of actors

    International Nuclear Information System (INIS)

    Ferracci, Vanina; Vandervorst, Alain; Tixier, Jean-Luc; Barthelemy, Christophe; Cloche-Dubois, Celine; Tenailleau, Francois; Rubio, Aurore-Emmanuelle; Pechamat, Olivier; Gandet, Stephanie; Deharbe, David; Rousset, Alain; Boedec, Morgan; Joffre, Andre; Blosseville, Thomas; Meunier, Stephane; Maincent, Guillaume

    2011-01-01

    The authors discuss legal issues and aspects regarding photovoltaic installations in France: the array installation (constraints related to urban planning: rules, authorizations and competencies when setting up on the ground or on buildings, urban taxes, estate issues), the connection to the grid, the financing (electricity prices, partnership contract), the new legal regime implemented in 2011, the question whether green taxing is still sufficiently attractive, the dispute about the mandatory purchase mechanism, and the attitude of the different actors (notably local communities, and industries) in front of the decrease of purchase prices

  7. Vacuum Insulation Panels Applied in Building Constructions

    NARCIS (Netherlands)

    Tenpierik, M.J.

    2010-01-01

    Due to sustainability and due to international treaties, it is desired and required to reduce greenhouse gas emissions drastically. One contributor to these emissions is the burning of fossil fuels for generating power and electricity to be used in and for buildings. Buildings and building-related

  8. Prize awarded by the German gas industry for rational use of natural gas, 1992. Documentation. Preis der deutschen Gaswirtschaft fuer rationellen Erdgaseinsatz 1992. Dokumentation

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-01

    After some short statements on the advantages of natural gas in terms of pollution reduction and energy conservation, 5 natural gas installations are described which were awarded a price in 1992. (UA).

  9. Strategies 2015: rational use of energy, electro-technologies, gas, oil

    International Nuclear Information System (INIS)

    Marchais, Jean-Jacques; Cailleton, Romain; Crozet, Marie-Emmanuelle; Bernard, Patrick; Goblot, Jean-Yves; Laine, Thierry; Kaczmarek, Dominique; D'Auriac, Francis

    2015-01-01

    After having outlined the context of emergence and the importance of the concept of energy efficiency, and its presence within international statements and protocols and within European and French legislations, a first article presents and comments the different associated strategic guidelines: priority to a quantitative approach to energy efficiency, contribution to the development of global energetic performance by taking sector normative works into account (energetic performance of buildings, of industrial systems, of transports, of industrial processes, and so on), promotion of the recourse to normalisation as a support to regulation, communication based on the terminology associated with transverse issues regarding energy saving, strengthening of the French influence in European and international bodies, bringing together a European expertise for a common and consistent message within international bodies. Main and important standards are indicated. Next articles discuss the context, general guidelines, challenges and issues for the development and promotion of standardisation in different specific sectors related to energy: electro-technologies (development of smart grids, of smart buildings, and of smart cities and communities, of an infrastructure as a support to digitalisation, of the use of direct current, and of electric mobility, issues of sustainable development in industry with energy efficiency, low carbon energies, and resource efficiency, safety issues regarding citizens, workers and installations), gas (development of biogas, power to gas, and retailed LNG), and oil. For each of these sectors, the concerned standards are indicated and an interview with an expert is proposed

  10. Energy efficiency measures for offshore oil and gas platforms

    International Nuclear Information System (INIS)

    Nguyen, Tuong-Van; Voldsund, Mari; Breuhaus, Peter; Elmegaard, Brian

    2016-01-01

    Oil and gas platforms are energy-intensive systems – each facility uses from a few to several hundreds MW of energy, depending on the petroleum properties, export specifications and field lifetime. Several technologies for increasing the energy efficiency of these plants are investigated in this work. They include: (i) the installation of multiple pressure levels in production manifolds, (ii) the implementation of multiphase expanders, (iii) the promotion of energy and process integration, (iv) the limitation of gas recirculation around the compressors, (v) the exploitation of low-temperature heat from the gas cooling steps, (vi) the downsizing or replacement of the existing gas turbines, and (vii) the use of the waste heat from the power plant. The present study builds on four actual cases located in the North and Norwegian Seas, which differ by the type of oil processed, operating conditions and strategies. The benefits and practical limitations of each measure are discussed based on thermodynamic, economic and environmental factors. Significant energy savings and reductions in CO_2-emissions are depicted, reaching up to 15–20%. However, they strongly differ from one facility to another, which suggests that generic improvements can hardly be proposed, and that thorough techno-economic analyses should be conducted for each plant. - Highlights: • Energy efficiency measures for offshore platforms are assessed. • Energy savings and reductions in CO_2-emissions can reach up to 15-20%. • They differ strongly depending on the oil type, operating conditions and strategies.

  11. Study on post occupancy evaluation after remodeling in accordance with the `green remodeling certification standards of existing non-residential buildings'- Focusing on the case of H building

    Science.gov (United States)

    Cho, Kyungjoo; Cho, Dongwoo; Yoon, Yosun

    2018-06-01

    South Korea has adopted the Paris Convention and promised to reduce greenhouse gas emissions by 37% from business-as-usual (BAU) levels in the `First Basic Plan to Respond to Climate Change'. The reduction goal of greenhouse gas cannot be achieved considering only new buildings; the analysis results shows that the reduction of greenhouse gas emissions from existing buildings is essential. `The Green Remodeling Certification Standards', established in South Korea in 2016, is in line with the above plan. The post-occupancy evaluation (POE) of remodeled buildings after applying the `Green Remodeling Certification Standards of Existing Buildings' must be studied for expansion of this scheme. The study results are expected to be used as foundational data for the promotion of remodeling existing buildings.

  12. Installation report - Lidar

    DEFF Research Database (Denmark)

    Georgieva Yankova, Ginka; Villanueva, Héctor

    The report describes the installation, configuration and data transfer for the ground-based lidar. The unit is provided by a customer but is installed and operated by DTU while in this project.......The report describes the installation, configuration and data transfer for the ground-based lidar. The unit is provided by a customer but is installed and operated by DTU while in this project....

  13. Evaluation of Trenchless Installation Technology for Radioactive Wastewater Piping Applications

    International Nuclear Information System (INIS)

    Robinson, Sharon M.; Jubin, Robert Thomas; Patton, Bradley D.; Sullivan, Nicholas M.; Bugbee, Kathy P.

    2009-01-01

    the sanitary sewer and natural gas pipeline industries, they have been used far less in contaminated environments. Although trenchless technologies have been used at ORNL in limited applications to install new potable water and gas lines, the technologies have not been used in radioactive applications. This study evaluates the technical risks, benefits, and economics for installing gravity drained and pressurized piping using trenchless technologies compared to conventional installation methods for radioactive applications under ORNL geological conditions. A range of trenchless installation technologies was reviewed for this report for general applicability for replacing existing contaminated piping and/or installing new pipelines in potentially contaminated areas. Installation methods that were determined to have potential for use in typical ORNL contaminated environments were then evaluated in more detail for three specific ORNL applications. Each feasible alternative was evaluated against the baseline conventional open trench installation method using weighted criteria in the areas of environment, safety, and health (ES and H); project cost and schedule; and technical operability. The formulation of alternatives for evaluation, the development of selection criteria, and the scoring of alternatives were performed by ORNL staff with input from vendors and consultants. A description of the evaluation methodology and the evaluation results are documented in the following sections of this report.

  14. BOA: Framework for Automated Builds

    CERN Document Server

    Ratnikova, N

    2003-01-01

    Managing large-scale software products is a complex software engineering task. The automation of the software development, release and distribution process is most beneficial in the large collaborations, where the big number of developers, multiple platforms and distributed environment are typical factors. This paper describes Build and Output Analyzer framework and its components that have been developed in CMS to facilitate software maintenance and improve software quality. The system allows to generate, control and analyze various types of automated software builds and tests, such as regular rebuilds of the development code, software integration for releases and installation of the existing versions.

  15. BOA: Framework for automated builds

    International Nuclear Information System (INIS)

    Ratnikova, N.

    2003-01-01

    Managing large-scale software products is a complex software engineering task. The automation of the software development, release and distribution process is most beneficial in the large collaborations, where the big number of developers, multiple platforms and distributed environment are typical factors. This paper describes Build and Output Analyzer framework and its components that have been developed in CMS to facilitate software maintenance and improve software quality. The system allows to generate, control and analyze various types of automated software builds and tests, such as regular rebuilds of the development code, software integration for releases and installation of the existing versions

  16. 30 CFR 250.1003 - Installation, testing, and repair requirements for DOI pipelines.

    Science.gov (United States)

    2010-07-01

    .... (a)(1) Pipelines greater than 8-5/8 inches in diameter and installed in water depths of less than 200... for DOI pipelines. 250.1003 Section 250.1003 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Pipelines...

  17. Study of Cycling Air-Cooling System with a Cold Accumulator for Micro Gas-Turbine Installations

    Science.gov (United States)

    Ochkov, V. F.; Stepanova, T. A.; Katenev, G. M.; Tumanovskii, V. A.; Borisova, P. N.

    2018-05-01

    Using the cycling air-cooling systems of the CTIC type (Combustion Turbine Inlet Cooling) with a cold accumulator in a micro gas-turbine installation (micro-GTI) to preserve its capacity under the seasonal temperature rise of outside air is described. Water ice is used as the body-storage in the accumulators, and ice water (water at 0.5-1.0°C) is used as the body that cools air. The ice water circulates between the accumulator and the air-water heat exchanger. The cold accumulator model with renewable ice resources is considered. The model contains the heat-exchanging tube lattice-evaporator covered with ice. The lattice is cross-flowed with water. The criterion heat exchange equation that describes the process in the cold accumulator under consideration is presented. The calculations of duration of its active operation were performed. The dependence of cold accumulator service life on water circulation rate was evaluated. The adequacy of the design model was confirmed experimentally in the mock-up of the cold accumulator with a refrigerating machine periodically creating a 200 kg ice reserve in the reservoir-storage. The design model makes it possible to determine the weight of ice reserve of the discharged cold accumulator for cooling the cycle air in the operation of a C-30 type micro- GTI produced by the Capstone Company or micro-GTIs of other capacities. Recommendations for increasing the working capacity of cold accumulators of CTIC-systems of a micro-GTI were made.

  18. Gas Detection for Experiments

    CERN Document Server

    Hay, D

    2001-01-01

    Flammable gases are often used in detectors for physics experiments. The storage, distribution and manipulation of such flammable gases present several safety hazards. As most flammable gases cannot be detected by human senses, specific well-placed gas detection systems must be installed. Following a request from the user group and in collaboration with CERN safety officers, risk analyses are performed. An external contractor, who needs to receive detailed user requirements from CERN, performs the installations. The contract is passed on a guaranteed results basis. Co-ordination between all the CERN groups and verification of the technical installation is done by ST/AA/AS. This paper describes and focuses on the structured methodology applied to implement such installations based on goal directed project management techniques (GDPM). This useful supervision tool suited to small to medium sized projects facilitates the task of co-ordinating numerous activities to achieve a completely functional system.

  19. Some problems of evaluating environmental impacts of nuclear power installation building and operation

    International Nuclear Information System (INIS)

    Uvirova, E.

    1984-01-01

    The impacts of the construction and operation of a nuclear power installation on the natural environment is discussed, namely on changes in the landscape profile, in the structure of settlement and large-scale agricultural production, the requisition of agricultural land, changes in transport systems, etc., as well as approaches to the evaluation of these environmental impacts with the aim of preserving the optimal state of inter-relations between man and the natural environment. (author)

  20. Consideration on developing of leaked inflammable gas detection system for HTGR hydrogen production system

    International Nuclear Information System (INIS)

    Nishihara, Tetsuo; Nakamura, Masashi

    1999-09-01

    One of most important safety design issues for High Temperature Gas-cooled Reactor (HTGR) - Hydrogen Production System (HTGR-HPS) is to ensure reactor safety against fire and explosion at the hydrogen production plant. The inflammable gas mixture in the HTGR-HPS does not use oxygen in any condition and are kept in high pressure in the normal operation. The piping system and/or heat transfer tubes which have the potential possibility of combustible materials ingress into the Reactor Building (R/B) due to the failure are designed to prevent the failure against any events. Then, it is not necessary to consider their self-combustion in vessels nor leakage in the R/B. The only one case which we must consider is the ex-building fire or explosion caused by their leakage from piping or vessel. And it is important to mitigate their effects by means of early detection of gas leakage. We investigated our domestic standards on gas detection, applications of gas detectors, their detection principles, performance, sensitivity, reliability, their technical trends, and so on. We proposed three gas detection systems which may be applied in HTGR-HPS. The first one is the universal solid sensor system; it may be applied when there is no necessity to request their safety credits. The second is the combination of the improved solid sensor system and enhanced beam detector system; it may be applied when it is necessary to request their safety credit. And the third is the combination of the universal solid sensor system and the existing beam detector system; it may be applied when the plant owner request higher detector sensitivity than usual, from the view point of public acceptance, though there is not necessity to request their safety credits. To reduce the plant cost by refusing of safety credits to the gas leakage detection system, we proposed that the equipment required to isolate from others should be installed in the inertrized compartments. (author)

  1. Kyiv institutional buildings sector energy efficiency program: Lending and implementation assessment

    Energy Technology Data Exchange (ETDEWEB)

    Secrest, T.J.; Freeman, S.L. [Pacific Northwest National Lab., Richland, WA (United States); Popelka, A. [Tysak Engineering, Acton, MA (United States); Shestopal, P.A.; Gagurin, E.V. [Agency for Rational Energy Use and Ecology, Kyiv (Ukraine)

    1997-08-01

    The government of Ukraine, through the State Committee of Energy Conservation (State Committee), is considering the implementation of energy efficiency measures in state and municipal institutional buildings in the city of Kyiv. The State Committee entered into a Memorandum of Cooperation with the US Department of Energy (DOE) to conduct an assessment of the institutional buildings sector efficiency potential. This assessment will be used to support a potential loan by the World Bank for implementing a buildings efficiency improvement program in Kyiv. This report provides an assessment of the options for structuring the lending scenarios and the implementation of the program. Components to the lending structure are options for the disbursement of funds, options for the loan service, and other financial options and considerations. Program implementation includes management structures, reporting, installation activities, and post-installation activities such as training and verification.

  2. Demand side management for commercial buildings using an in line heat pump water heating methodology

    International Nuclear Information System (INIS)

    Rankin, Riaan; Rousseau, Pieter G.; Eldik, Martin van

    2004-01-01

    Most of the sanitary hot water used in South African buildings is heated by means of direct electrical resistance heaters. This is one of the major contributors to the undesirably high morning and afternoon peaks imposed on the national electricity supply grid. For this reason, water heating continues to be of concern to the electricity supplier, ESCOM. Previous studies, conducted by the Potchefstroom University for Christian Higher Education in South Africa, indicated that extensive application of the so called inline heat pump water heating methodology in commercial buildings could result in significant demand side management savings to ESKOM. Furthermore, impressive paybacks can be obtained by building owners who choose to implement the design methodology on existing or new systems. Currently, a few examples exist where the design methodology has been successfully implemented. These installations are monitored with a fully web centric monitoring system that allows 24 h access to data from each installation. Based on these preliminary results, a total peak demand reduction of 108 MW can be achieved, which represents 18% of the peak load reduction target set by ESKOM until the year 2015. This represents an avoided cost of approximately MR324 (ZAR) [Int J Energy Res 25(4) (1999) 2000]. Results based on actual data from the monitored installations shows a significant peak demand reduction for each installation. In one installation, a hotel with an occupancy of 220 people, the peak demand contribution of the hot water installation was reduced by 86%, realizing a 36% reduction in peak demand for the whole building. The savings incurred by the building owner also included significant energy consumption savings due to the superior energy efficiency of the heat pump water heater. The combined savings result in a conservatively calculated straight payback period of 12.5 months, with an internal rate of return of 98%. The actual cost of water heating is studied by

  3. Progress in standards for nuclear air and gas treatment

    International Nuclear Information System (INIS)

    Burchsted, C.A.

    1978-01-01

    Standardization in nuclear air and gas treatment spans a period of more than 25 years, starting with military specifications for HEPA filters and filter media, and now progressing to the development of a formal code analogous to the ASME Boiler and Pressure Vessel Code. Whereas the current standard for components and installation of nuclear air cleaning systems is limited to safety related facilities for nuclear power plants, the proposed code will cover all types of critical ventilation and air and gas treatment installations for all types of nuclear facilities

  4. Detection device for off-gas system accidents

    International Nuclear Information System (INIS)

    Kubota, Ryuji; Tsuruoka, Ryozo; Yamanari, Shozo.

    1984-01-01

    Purpose: To rapidly isolate the off-gas system by detecting the off-gas system failure accident in a short time. Constitution: Radiation monitors are disposed to ducts connecting an exhaust gas area and an air conditioning system as a portion of a turbine building. The ducts are disposed independently such that they ventilate only the atmosphere in the exhaust gas area and do not mix the atmosphere in the turbine building. Since radioactivity issued upon off-gas accidents to the exhaust gas area is sucked to the duct, it can be detected by radiation detection monitors in a short time after the accident. Further, since the operator judges it as the off-gas system accident, the off-gas system can be isolated in a short time after the accident. (Moriyama, K.)

  5. INFLUENCE OF PIT WALL ANCHORAGE ONTO ADDITIONAL DEFORMATIONS OF EXISTING BUILDINGS

    Directory of Open Access Journals (Sweden)

    Kubetskiy Valeriy Leonidovich

    2012-07-01

    Assessment of additional projected deformations of buildings located in close proximity to pits is exemplified by the specific structure of the pit support system that has active PIT [1] anchors. The authors also consider the influence produced by the structure of anchors onto the two buildings located within the area of influence of the excavation works and protected by the anchors installed underneath the foundations of the two adjacent buildings.

  6. Health and Safety Research Division manual for the x-ray facility in Building 2008

    International Nuclear Information System (INIS)

    Stansbury, P.S.

    1977-11-01

    The facility in the east end of Building 2008, ORNL, consists of an x-ray machine and a shielded enclosure. The x-ray machine is of the constant potential type and can be operated continuously at generating potentials up to 125 kVcp with tube currents ranging from 0.1 μA to 10 mA. Both the generating potential and the tube current are highly regulated and stabilized. The machine is installed and operated within a large shielded enclosure. In addition to the x-ray machine and its ancillary equipment, the shielded enclosure contains many of the features of a general chemistry and physics laboratory including work benches, sinks, storage space, and electrical and gas service. This manual contains instructions for the safe operation of the x-ray machine

  7. Field tests and commercialization of natural gas leak detectors

    Energy Technology Data Exchange (ETDEWEB)

    Choi, D S; Jeon, J S; Kim, K D; Cho, Y A [R and D Center, Korea Gas Corporation, Ansan (Korea)

    1999-09-01

    Objectives - (1) fields test of industrial gas leak detection monitoring system. (2) commericialization of residential gas leak detector. Contents - (1) five sets of gas leak detection monitoring system were installed at natural gas transmition facilities and tested long term stability and their performance. (2) improved residential gas leak detector was commercialised. Expected benefits and application fields - (1) contribution to the improvement of domestic gas sensor technology. (2) localization of fabrication technology for gas leak detectors. 23 refs., 126 figs., 37 tabs.

  8. Rehabilitation Measures against radon gas entry

    International Nuclear Information System (INIS)

    Frutos Vazquez, Borja; Olaya Adan, Manuel; Esteban Saiz, Jose Luis

    2011-01-01

    Radon gas is a pathological agent for inhabitants of buildings where it is present. Due to its origin in uranium decay chain, it bears radioactive effects that inside human body lead to higher risks of developing lung cancer. It comes from soils containing granite masses or other substrates containing uranium. It enters through common material used in constructions, such as concrete ground slabs, basement walls, etc. In order to avoid such gas immission into inhabited rooms, several measurements cab be considered for existing buildings. This study intends to show the results obtained for radon reductions by means of different constructive solutions, already designed and executed so as to stop radon gas immission into a prototype building constructed for this specific purpose

  9. Corrective action baseline report for underground storage tank 2331-U Building 9201-1

    International Nuclear Information System (INIS)

    1994-01-01

    The purpose of this report is to provide baseline geochemical and hydrogeologic data relative to corrective action for underground storage tank (UST) 2331-U at the Building 9201-1 Site. Progress in support of the Building 9201-1 Site has included monitoring well installation and baseline groundwater sampling and analysis. This document represents the baseline report for corrective action at the Building 9201-1 site and is organized into three sections. Section 1 presents introductory information relative to the site, including the regulatory initiative, site description, and progress to date. Section 2 includes the summary of additional monitoring well installation activities and the results of baseline groundwater sampling. Section 3 presents the baseline hydrogeology and planned zone of influence for groundwater remediation

  10. Gas Fride Heat Pumps : The Present and Future

    Science.gov (United States)

    Kurosawa, Shigekichi; Ogura, Masao

    In japan techniques for saving energy is an important goal since energy resources such as oil and nuclear power are limited. Recently gas fired absorption heat pumps and gas engine driven heat pumps have been installed in facilifies such as hotels, swimming pools and offices. In this article recent techniques, applications and future aspects for gas fired heat pumps are explained.

  11. Nova Gas's pipeline to Asia

    International Nuclear Information System (INIS)

    Lea, N.

    1996-01-01

    The involvement of the Calgary-based company NOVA Gas International (NGI) in Malaysia's peninsular gas utilization (PGU) project, was described. Phase I and II of the project involved linking onshore gas processing plants with a natural gas transmission system. Phase III of the PGU project was a gas transmission pipeline that began midway up the west coast of peninsular Malaysia to the Malaysia-Thailand border. The complex 549 km pipeline included route selection, survey and soil investigation, archaeological study, environmental impact assessment, land acquisition, meter-station construction, telecommunication systems and office buildings. NGI was the prime contractor on the project through a joint venture with OGP Technical Services, jointly owned by NGI and Petronas, the Thai state oil company. Much of NGI's success was attributed to excellent interpersonal skills, particularly NGI's ability to build confidence and credibility with its Thai partners

  12. Modelling and dynamic simulation of processes with 'MATLAB'. An application of a natural gas installation in a power plant

    Energy Technology Data Exchange (ETDEWEB)

    Gonzalez-Bustamante, J.A.; Sala, J.M.; Flores, I. [Escuela Superior de Ingenieros Industriales de Bilbao, Universidad del Pais Vasco, Alameda de Urquijo, s/n 48013 Bilbao (Bizkaia) (Spain); Lopez-Gonzalez, L.M. [Escuela Tecnica Superior de Ingenieria Industrial, Universidad de La Rioja, C/ Luis de Ulloa, 20. E 26004 Logrono (La Rioja) (Spain); Miguez, J.L. [Universidad de Vigo, Escuela Tecnica Superior de Ingenieros Industriales, C/Lagoas-Marcosende, s/n 36200 Vigo (Pontevedra) (Spain)

    2007-07-15

    In this paper, it is proposed to incorporate the analysis of the dynamic performance of the process into the design and engineering stage of projects as a means of analysing and resolving this type of problem. The following contributions are made with this objective in mind:(a)The barriers in the way of dynamic analysis are identified. (b)Software tools which make dynamic analysis accessible during the design and engineering phase of the project are proposed. To achieve this goal, modelling and mathematical simulation are used, with the following features: circle strict modelling of mass, momentum and energy conservation equations as well as state equations, and circle utilisation of the 'Matlab-Simulink' package as the base-software tool. (c)The procedure and tool proposed for dynamic analysis during the design phase should enable these studies to be carried out at a reasonable cost and time for regular industrial projects, and not just for large research projects or nuclear power plants. To complete this paper, we apply our method to a natural gas installation in a power plant. The model is applied to study the transients of a natural gas supply line to a steam-electric power plant. The results of the model have been validated with the actual data on the boiler trip obtained from the distributed control system of a steam-electric power plant. (author)

  13. Basic survey project for joint implementation, etc. for associated gas utilization project at Kokdumalak Gas Field in Republic of Uzbekistan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For the purpose of reducing greenhouse effect gas emissions, a survey was conducted of the recovery/utilization of the associated gas in the Kokdumalak gas field in the Republic of Uzbekistan. In this area, crude oil and natural gas are produced, but the associated gas, etc. are released burning in the atmospheric air. This plan aims to recover LPG, NGL, etc. from these. In the plan, studies were made on the installation in the Karaulbazar area of production facilities of LPG of 369t/d and NGL of 107t/d by the feed of raw gas of 5,748,000 Sm{sup 3}/d and of LPG storage facilities, and on the installation of a 80km-LPG pipeline. The construction work will start in April, 2001 and is planned to be completed in 33 months. The investment required is estimated at approximately 82,003M US$. The substituting energy generated in this plan will be 168,418 toe/y and will total 5,052,546 toe in the term. Moreover, the reduction in greenhouse effect gas emissions will be 4.52 million t/y in CO2 and will total 135 million t in CO2 in the term. (NEDO)

  14. Preliminary experimental investigation of a natural gas-fired ORC-based micro-CHP system for residential buildings

    International Nuclear Information System (INIS)

    Farrokhi, M.; Noie, S.H.; Akbarzadeh, A.A.

    2014-01-01

    The continual increases in energy demand and greenhouse gas emissions, call for efficient use of energy resources. Decentralized combined heat and power (CHP) technology provides an alternative for the world to meet and solve energy-related problems including energy shortages, energy supply security, emission control and conservation of energy. This paper presents the preliminary results of an experimental investigation of a natural gas-fired micro-CHP system for residential buildings based on an organic Rankine cycle (ORC). Isopentane was used as the ORC working fluid in consideration of several criteria including its environmentally-friendly characteristics. Experiments were conducted to evaluate the performance of the developed system at different heat source temperatures of nominally 85, 80, 75, 70, and 65 °C. The maximum electrical power output of 77.4 W was generated at heating water entry temperature of 84.1 °C, corresponding to net cycle electrical efficiency of 1.66%. Further work will be done with a view to increasing the cycle electrical efficiency by using more efficient components, in particular the expander and generator. - Highlights: •A natural gas-fired ORC-based micro-scale CHP system has been developed and tested. •The good agreement between the mechanical and gross power validates the assumptions. •A vane expander suits a micro-CHP system based on an organic Rankine cycle. •A vane expander does not suit power generation by a Trilateral Flash Cycle (TFC). •Domestic gas-fired ORC systems may reduce reliance on central power stations

  15. Government response to the consultation on proposals relating to the decommissioning of offshore energy installations

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-11-09

    This document presents the UK government's response to consultation concerning decommissioning offshore oil and gas installations and pipelines and offshore renewable energy installations and associated power lines. The key issues discussed cover provision of funds for decommissioning, safeguarding the funds in event of insolvency, and widening the categories of people on whom decommissioning obligations can be placed in addition to earlier issue of notices and provision of decommissioning security, and extending the power of the Secretary of State to require information.

  16. Greenhouse Gas Abatement with Distributed Generation in California's Commercial Buildings

    International Nuclear Information System (INIS)

    Stadler, Michael; Marnay, Chris; Cardoso, Goncalo; Megel, Olivier; Siddiqui, Afzal; Lai, Judy

    2009-01-01

    Lawrence Berkeley National Laboratory (LBL) is working with the California Energy Commission (CEC) to determine the role of distributed generation (DG) in greenhouse gas reductions. The impact of DG on large industrial sites is well known, and mostly, the potentials are already harvested. In contrast, little is known about the impact of DG on commercial buildings with peak electric loads ranging from 100 kW to 5 MW. We examine how DG with combined heat and power (CHP) may be implemented within the context of a cost minimizing microgrid that is able to adopt and operate various smart energy technologies, such as thermal and photovoltaic (PV) on-site generation, heat exchangers, solar thermal collectors, absorption chillers, and storage systems. We use a mixed-integer linear program (MILP) that has the minimization of a site's annual energy costs as objective. Using 138 representative commercial sites in California (CA) with existing tariff rates and technology data, we find the greenhouse gas reduction potential for California's commercial sector. This paper shows results from the ongoing research project and finished work from a two year U.S. Department of Energy research project. To show the impact of the different technologies on CO2 emissions, several sensitivity runs for different climate zones within CA with different technology performance expectations for 2020 were performed. The considered sites can contribute between 1 Mt/a and 1.8 Mt/a to the California Air Resources Board (CARB) goal of 6.7Mt/a CO2 abatement potential in 2020. Also, with lower PV and storage costs as well as consideration of a CO2 pricing scheme, our results indicate that PV and electric storage adoption can compete rather than supplement each other when the tariff structure and costs of electricity supply have been taken into consideration. To satisfy the site's objective of minimizing energy costs, the batteries will be charged also by CHP systems during off-peak and mid-peak hours and

  17. Gas turbine cleaning upgrade (compressor wash)

    Energy Technology Data Exchange (ETDEWEB)

    Asplund, P [Gas Turbine Efficiency, Jarfalla (Sweden)

    1999-12-31

    The influence of gas turbine degradation on operating costs is high. Gas turbine cleaning is one of many actions taken for power recovery and is to consider as preventive maintenance. It is generally performed within the industrial field and occasionally within the aero sector. In order to meet the gas turbine development win high blade loads and ever-increasing temperatures, together with emission Aces and environmental regulations, more efficient and careful cleaning methods are needed. Following a survey about potentials for cost reduction in gas turbine operation a new man-hour and water saving cleaning method has been evaluated for a standard process. Compared with traditional cleaning methods, the new method is water,- cost,- weight and space saving due to a new washing technique. Traditional methods are based on using different nozzles for ON and OFF-line cleaning, which rise the demand for complicated systems. In the new method the same nozzle installation, same liquid flow and pressure is used for both ON and OFF-line cleaning. This gives a cost reduction of appr. 20.000 - 30.000 USD per gas turbine depending on installation and size. Evaluation of the new method shows significantly improved ON -line cleaning performance and thus OFF -line cleaning is required only during scheduled stops. (orig.) 10 refs.

  18. Gas turbine cleaning upgrade (compressor wash)

    Energy Technology Data Exchange (ETDEWEB)

    Asplund, P. [Gas Turbine Efficiency, Jarfalla (Sweden)

    1998-12-31

    The influence of gas turbine degradation on operating costs is high. Gas turbine cleaning is one of many actions taken for power recovery and is to consider as preventive maintenance. It is generally performed within the industrial field and occasionally within the aero sector. In order to meet the gas turbine development win high blade loads and ever-increasing temperatures, together with emission Aces and environmental regulations, more efficient and careful cleaning methods are needed. Following a survey about potentials for cost reduction in gas turbine operation a new man-hour and water saving cleaning method has been evaluated for a standard process. Compared with traditional cleaning methods, the new method is water,- cost,- weight and space saving due to a new washing technique. Traditional methods are based on using different nozzles for ON and OFF-line cleaning, which rise the demand for complicated systems. In the new method the same nozzle installation, same liquid flow and pressure is used for both ON and OFF-line cleaning. This gives a cost reduction of appr. 20.000 - 30.000 USD per gas turbine depending on installation and size. Evaluation of the new method shows significantly improved ON -line cleaning performance and thus OFF -line cleaning is required only during scheduled stops. (orig.) 10 refs.

  19. LHC installation planning

    CERN Document Server

    Weisz, S

    2005-01-01

    installation of the general services, the installation of the cryogenic line (QRL), the installation of the machine elements and the hardware commissioning. While the installation of the general services is now almost finished (see presentation by Katy Foraz and Serge Grillot), several problems and delays with the QRL made it unavoidable to revise the installation strategy and to schedule a number tasks in parallel. A new compressed installation planning has been issued, that fulfils the strategic objectives and allows starting new activities with minimal delays in sectors 7-8 and 8-1. However, the shortcuts that are introduced increase the level of risk that we will have to face and the coordination of such a large and complex variety of simultaneous activities makes the project even more challenging. The document will describe how the input from the different equipment groups is taken into account by the master schedule planning team with respect to equipment availability and production as well as logistics...

  20. Economic Feasibility Analysis of the Application of Geothermal Energy Facilities to Public Building Structures

    Directory of Open Access Journals (Sweden)

    Sangyong Kim

    2014-03-01

    Full Text Available This study aims to present an efficient plan for the application of a geothermal energy facility at the building structure planning phase. Energy consumption, energy cost and the primary energy consumption of buildings were calculated to enable a comparison of buildings prior to the application of a geothermal energy facility. The capacity for energy savings and the costs related to the installation of such a facility were estimated. To obtain more reliable criteria for economic feasibility, the lifecycle cost (LCC analysis incorporated maintenance costs (reflecting repair and replacement cycles based on construction work specifications of a new renewable energy facility and initial construction costs (calculated based on design drawings for its practical installation. It is expected that the findings of this study will help in the selection of an economically viable geothermal energy facility at the building construction planning phase.

  1. Interdependence of the Electricity Generation System and the Natural Gas System and Implications for Energy Security

    Science.gov (United States)

    2013-05-15

    installation of natural gas generation or cogeneration plants to increase their energy security from the typical three days using diesel supplies to weeks-to...better quantify the regional impact of natural gas for energy security. Modeling and simulation could identify those regions and DoD installations that...Interdependence of the Electricity Generation System and the Natural Gas System and Implications for Energy Security N. Judson 15 May 2013 Prepared for the

  2. Specific model for a gas distribution analysis in the containment at Almaraz NPP using GOTHIC computer code

    International Nuclear Information System (INIS)

    García González, M.; García Jiménez, P.; Martínez Domínguez, F.

    2016-01-01

    To carry out an analysis of the distribution of gases within the containment building at the CN Almaraz site, a simulation model with the thermohydraulic GOTHIC [1] code has been used. This has been assessed with a gas control system based on passive autocatalytic recombiners (PARs). The model is used to test the effectiveness of the control systems for gases to be used in the Almaraz Nuclear Power Plant, Uits I&II (Caceres, Spain, 1,035 MW and 1,044 MW). The model must confirm the location and number of the recombiners proposed to be installed. It is an essential function of the gas control system to avoid any formation of explosive atmospheres by reducing and limiting the concentration of combustible gases during an accident, thus maintaining the integrity of the containment. The model considers severe accident scenarios with specific conditions that produce the most onerous generation of combustible gases.

  3. Building America Case Study: Multifamily Central Heat Pump Water Heaters, Davis, California

    Energy Technology Data Exchange (ETDEWEB)

    M. Hoeschele, E. Weitzel

    2017-03-01

    Although heat pump water heaters (HPWHs) have gained significant attention in recent years as a high efficiency electric water heating solution for single family homes, central HPWHs for commercial or multi-family applications are not as well documented in terms of measured performance and cost effectiveness. To evaluate this technology, the Alliance for Residential Building Innovation team monitored the performance of a 10.5 ton central HPWH installed on a student apartment building at the West Village Zero Net Energy Community in Davis, California. Monitoring data collected over a 16-month period were then used to validate a TRNSYS simulation model. The TRNSYS model was then used to project performance in different climates using local electric rates. Results of the study indicate that after some initial commissioning issues, the HPWH operated reliably with an annual average efficiency of 2.12 (Coefficient of Performance). The observed efficiency was lower than the unit's rated efficiency, primarily due to the fact that the system rarely operated under steady-state conditions. Changes in the system configuration, storage tank sizing, and control settings would likely improve the observed field efficiency. Modeling results suggest significant energy savings relative to electric storage water heating systems (typical annual efficiencies around 0.90) providing for typical simple paybacks of six to ten years without any incentives. The economics versus gas water heating are currently much more challenging given the current low natural gas prices in much of the country. Increased market size for this technology would benefit cost effectiveness and spur greater technology innovation.

  4. Building America Case Study: Multifamily Central Heat Pump Water Heaters, Davis, California

    Energy Technology Data Exchange (ETDEWEB)

    2017-03-08

    Although heat pump water heaters (HPWHs) have gained significant attention in recent years as a high efficiency electric water heating solution for single family homes, central HPWHs for commercial or multi-family applications are not as well documented in terms of measured performance and cost effectiveness. To evaluate this technology, the Alliance for Residential Building Innovation team monitored the performance of a 10.5 ton central HPWH installed on a student apartment building at the West Village Zero Net Energy Community in Davis, California. Monitoring data collected over a 16-month period were then used to validate a TRNSYS simulation model. The TRNSYS model was then used to project performance in different climates using local electric rates. Results of the study indicate that after some initial commissioning issues, the HPWH operated reliably with an annual average efficiency of 2.12 (Coefficient of Performance). The observed efficiency was lower than the unit's rated efficiency, primarily due to the fact that the system rarely operated under steady-state conditions. Changes in the system configuration, storage tank sizing, and control settings would likely improve the observed field efficiency. Modeling results suggest significant energy savings relative to electric storage water heating systems (typical annual efficiencies around 0.90) providing for typical simple paybacks of six to ten years without any incentives. The economics versus gas water heating are currently much more challenging given the current low natural gas prices in much of the country. Increased market size for this technology would benefit cost effectiveness and spur greater technology innovation.

  5. Effectiveness of biosecurity measures in preventing badger visits to farm buildings.

    Science.gov (United States)

    Judge, Johanna; McDonald, Robbie A; Walker, Neil; Delahay, Richard J

    2011-01-01

    Bovine tuberculosis caused by Mycobacterium bovis is a serious and economically important disease of cattle. Badgers have been implicated in the transmission and maintenance of the disease in the UK since the 1970s. Recent studies have provided substantial evidence of widespread and frequent visits by badgers to farm buildings during which there is the potential for close direct contact with cattle and contamination of cattle feed. Here we evaluated the effectiveness of simple exclusion measures in improving farm biosecurity and preventing badger visits to farm buildings. In the first phase of the study, 32 farms were surveyed using motion-triggered infrared cameras on potential entrances to farm buildings to determine the background level of badger visits experienced by each farm. In the second phase, they were divided into four treatment groups; "Control", "Feed Storage", "Cattle Housing" and "Both", whereby no exclusion measures were installed, exclusion measures were installed on feed storage areas only, cattle housing only or both feed storage and cattle housing, respectively. Badger exclusion measures included sheet metal gates, adjustable metal panels for gates, sheet metal fencing, feed bins and electric fencing. Cameras were deployed for at least 365 nights in each phase on each farm. Badger visits to farm buildings occurred on 19 of the 32 farms in phase one. In phase two, the simple exclusion measures were 100% effective in preventing badger entry into farm buildings, as long as they were appropriately deployed. Furthermore, the installation of exclusion measures also reduced the level of badger visits to the rest of the farmyard. The findings of the present study clearly demonstrate how relatively simple practical measures can substantially reduce the likelihood of badger visits to buildings and reduce some of the potential for contact and disease transmission between badgers and cattle.

  6. Effectiveness of biosecurity measures in preventing badger visits to farm buildings.

    Directory of Open Access Journals (Sweden)

    Johanna Judge

    Full Text Available BACKGROUND: Bovine tuberculosis caused by Mycobacterium bovis is a serious and economically important disease of cattle. Badgers have been implicated in the transmission and maintenance of the disease in the UK since the 1970s. Recent studies have provided substantial evidence of widespread and frequent visits by badgers to farm buildings during which there is the potential for close direct contact with cattle and contamination of cattle feed. METHODOLOGY: Here we evaluated the effectiveness of simple exclusion measures in improving farm biosecurity and preventing badger visits to farm buildings. In the first phase of the study, 32 farms were surveyed using motion-triggered infrared cameras on potential entrances to farm buildings to determine the background level of badger visits experienced by each farm. In the second phase, they were divided into four treatment groups; "Control", "Feed Storage", "Cattle Housing" and "Both", whereby no exclusion measures were installed, exclusion measures were installed on feed storage areas only, cattle housing only or both feed storage and cattle housing, respectively. Badger exclusion measures included sheet metal gates, adjustable metal panels for gates, sheet metal fencing, feed bins and electric fencing. Cameras were deployed for at least 365 nights in each phase on each farm. RESULTS: Badger visits to farm buildings occurred on 19 of the 32 farms in phase one. In phase two, the simple exclusion measures were 100% effective in preventing badger entry into farm buildings, as long as they were appropriately deployed. Furthermore, the installation of exclusion measures also reduced the level of badger visits to the rest of the farmyard. The findings of the present study clearly demonstrate how relatively simple practical measures can substantially reduce the likelihood of badger visits to buildings and reduce some of the potential for contact and disease transmission between badgers and cattle.

  7. Photovoltaic building sheathing element with anti-slide features

    Science.gov (United States)

    Keenihan, James R.; Langmaid, Joseph A.; Lopez, Leonardo C.

    2015-09-08

    The present invention is premised` upon an assembly that includes at least a photovoltaic building sheathing element capable of being affixed on a building structure, the photovoltaic building sheathing element. The element including a photovoltaic cell assembly, a body portion attached to one or more portions of the photovoltaic cell assembly; and at feast a first and a second connector assembly capable of directly or indirectly electrically connecting the photovoltaic cell assembly to one or more adjoining devices; wherein the body portion includes one or more geometric features adapted to engage a vertically adjoining device before installation.

  8. Impact of Fire Ventilation on General Ventilation in the Building

    Science.gov (United States)

    Zender-Świercz, Ewa; Telejko, Marek

    2017-10-01

    The fire of building is a threat to its users. The biggest threat is generation, during lifetime of fire, hot gases and smoke. The purpose of quick and efficient evacuation from the area covered by the fire, at first step the escape routes have to be secured from smokiness. The smoke ventilation systems are used for this purpose. The proper design and execution of smoke ventilation is important not only because of the safety, but also of the maintenance of comfort in the building at a time when there is no fire. The manuscript presents the effect of incorrectly realized smoke ventilation in the stairwell of the medium building. The analysis shows that the flaps of smoke ventilation located in the stairwell may have a significant impact on the proper functioning of mechanical ventilation in the period when there is no fire. The improperly installed or incorrect insulated components cause perturbation of air flow and they change pressure distribution in the building. The conclusion of the analysis is the need to include the entire technical equipment of the building during the design and realization of its individual elements. The impact of various installations at each other is very important, and the omission of any of them can cause disturbances in the proper work of another.

  9. Efficient lighting in buildings: The lack of legislation in Portugal

    International Nuclear Information System (INIS)

    Almeida, António Manuel; Martins, António Gomes

    2014-01-01

    The behavior of building designers is conditioned by the existing legislation and regulations in the national context in which they operate. However, in the Portuguese legislation there are no rules concerning the use of daylight, and therefore, designers are not stimulated to adopt solutions that make use of the existing potential of sunlight availability. In the same way, it is difficult to understand the lack of specific regulation, with quantified targets, limiting power density of artificial lighting installed inside buildings. The present opportunity, generated by the need to carry out the revision of Portuguese building energy systems regulation, should be used to fill the existing gap in national legislation regarding those matters. In this paper the authors present some proposals for future legislation that will have as central purpose the utilization of efficient lighting systems and the promotion of architectural solutions that optimize the use of daylighting. It is possible, and desirable, to add new directives to national legislation that contribute to the improvement of Portuguese buildings, characterized by its good performance in terms of daylight availability, and at the same time, increasing the energy efficiency and reducing the energy consumption of lighting systems installed in those buildings. - Highlights: • In the Portuguese legislation there are no rules concerning the use of daylight. • Lack of specific regulation limiting power density of artificial lighting. • Revision of Portuguese building energy systems regulation. • Some proposals for future legislation. • Improvement of Portuguese buildings promoting energy efficiency

  10. Gas supply device

    International Nuclear Information System (INIS)

    Yamamoto, Tokihiro.

    1986-01-01

    Purpose: When injecting gas during plasma discharge, to prevent erronous operation of the piezoelectric valves due to vibrations and to inject gas into the vacuum vessel by accurately controlling gas flow. Constitution: The piezoelectric valve designed to control the flow of gas when charging vacuum vessels is installed between the vacuum vessel and the gas cylinder and a pulse voltage generator to control the valve (open/close) and the reverse voltage generator to apply a reverse current to the valve element are also provided. When a voltage is applied to the piezoelectric element, the piezoelectric element bends. However, when the polarity is changed, the direction of the bend is also reversed. The seat portion is pressed in proportion to the degree of bending. When gas is injected while plasma is being discharged, the gap created, due to vibrations, between the piezoelectric element and the sealing material is prevented by the application of a reverse current. This allows precise control of the gas injection volume as well as the injection interval. This assures maintenance of precise test conditions when testing thermonuclear devices. (Horiuchi, T.)

  11. Solar energy system installed at the North Georgia APDC office building

    Science.gov (United States)

    1979-01-01

    A hydronic, automatic drain-down solar heating and cooling system is described. The system provides solar heat exchange from a 2,001 square foot effective collector area and supplies 65-70 percent of the building's cooling demand, 90-95 percent of the heating demand, and domestic hot water. The acceptance test plan and results, system operation and maintenance, and predicted system performance are presented.

  12. Smart Microgrid Energy Management Controls for Improved Energy Efficiency and Renewables Integration at DoD Installations

    Science.gov (United States)

    2013-05-01

    reduced greenhouse gas (GHG) emissions; 2. Increased energy efficiency; and 3. Increased energy surety. This demonstration will also directly impact ...megawatt (MW), as well as a gas-fired cogeneration plant in excess of 7 MW. In the future, additional solar PV, fuel cells and advanced energy storage... Energy Management Controls for Improved Energy Efficiency and Renewables Integration at DoD Installations May 2013 Report Documentation Page Form

  13. Quality assurance in the structural installations of nuclear power stations

    International Nuclear Information System (INIS)

    Schnellenbach, G.; Wrage, S.

    1985-01-01

    The concept of quality assurance distinguishes between self-monitoring of the design, manufacturing and executing firms and external monitoring by state institutions or by experts commissioned by them. The long-term control of structures is within the area of responsibility of the owner. This quality assurance concept is controlled in detail by statutes, which clearly define responsibilities. This structural engineering quality assurance system also forms the basis for the design, construction and utilization of structural installations of nuclear power stations; requirements emanating from the Atomic Energy Acts for the structural installations demand, however, to some extent a sharpening of self- and external monitoring. Therefore, today a quality concept has been developed for the important engineering safety-related buildings of nuclear power stations. This concept takes account of the strict requirements imposed and fulfils the requirement of KTA 1401. (orig.) [de

  14. Retained gas sampler interim safety assessment

    Energy Technology Data Exchange (ETDEWEB)

    Pasamehmetoglu, K.O.; Miller, W.O.; Unal, C.; Fujita, R.K.

    1995-01-13

    This safety assessment addresses the proposed action to install, operate, and remove a Retained Gas Sampler (RGS) in Tank 101-SY at Hanford. Purpose of the RGS is to help characterize the gas species retained in the tank waste; the information will be used to refine models that predict the gas-producing behavior of the waste tank. The RGS will take samples of the tank from top to bottom; these samples will be analyzed for gas constituents. The proposed action is required as part of an evaluation of mitigation concepts for eliminating episodic gas releases that result in high hydrogen concentrations in the tank dome space.

  15. Retained gas sampler interim safety assessment

    International Nuclear Information System (INIS)

    Pasamehmetoglu, K.O.; Miller, W.O.; Unal, C.; Fujita, R.K.

    1995-01-01

    This safety assessment addresses the proposed action to install, operate, and remove a Retained Gas Sampler (RGS) in Tank 101-SY at Hanford. Purpose of the RGS is to help characterize the gas species retained in the tank waste; the information will be used to refine models that predict the gas-producing behavior of the waste tank. The RGS will take samples of the tank from top to bottom; these samples will be analyzed for gas constituents. The proposed action is required as part of an evaluation of mitigation concepts for eliminating episodic gas releases that result in high hydrogen concentrations in the tank dome space

  16. The Upgraded Plasma Focus Installation > - The Installation >

    International Nuclear Information System (INIS)

    Krokhin, O.N.; Nikulin, V.Ya.; Babenko, B.A.; Gorbunov, D.N.; Gurei, A.E.; Kalachev, N.V.; Kozlova, T.A.; Malafeev, Yu.S.; Polukhin, S.N.; Sychev, A.A.; Tikhomirov, A.A.; Tsybenko, S.P.; Volobuev, I.V.

    1999-01-01

    The paper presents the upgraded plasma focus installation > - the installation > and some preliminary experimental results. The total energy stored in capacity bank is now 400 kJ, current - 5 MA with the rise time 3.5 μs. The investigation is targeted on the study of near electrode processes and its influence on plasma dynamics in a special operating regime of Filippov type PF - Hard X-ray regime. (author)

  17. Design and installation manual for thermal energy storage

    Energy Technology Data Exchange (ETDEWEB)

    Cole, R L; Nield, K J; Rohde, R R; Wolosewicz, R M

    1980-01-01

    The purpose of this manual is to provide information on the design and installation of thermal energy storage in active solar systems. It is intended for contractors, installers, solar system designers, engineers, architects, and manufacturers who intend to enter the solar energy business. The reader should have general knowledge of how solar heating and cooling systems operate and knowledge of construction methods and building codes. Knowledge of solar analysis methods such as f-Chart, SOLCOST, DOE-1, or TRNSYS would be helpful. The information contained in the manual includes sizing storage, choosing a location for the storage device, and insulation requirements. Both air-based and liquid-based systems are covered with topics on designing rock beds, tank types, pump and fan selection, installation, costs, and operation and maintenance. Topics relevant to latent heat storage include properties of phase-change materials, sizing the storage unit, insulating the storage unit, available systems, and cost. Topics relevant to heating domestic water include safety, single- and dual-tank systems, domestic water heating with air- and liquid-based space heating systems, and stand alone domestics hot water systems. Several appendices present common problems with storage systems and their solutions, heat transfer fluid properties, economic insulation thickness, heat exchanger sizing, and sample specifications for heat exchangers, wooden rock bins, steel tanks, concrete tanks, and fiberglass-reinforced plastic tanks.

  18. Statement of nuclear incidents at nuclear installations: first quarter 1994

    International Nuclear Information System (INIS)

    1994-06-01

    As a requirement of the 1974 Health and Safety at Work Act, the United Kingdom Health and Safety Inspectorate is required to publish reports of nuclear incidents at nuclear installations. This report covers the period 1st January to 31st March 1994. Two incidents are reported for Dungeness A Power Station, one at the Amersham International building on site at Harwell Laboratory, one at AEA Technology's Windscale Plant and one at British Nuclear Fuels Limited's Sellafield site. (UK)

  19. Report on the French gas market opening

    International Nuclear Information System (INIS)

    Syrota, J.

    2002-10-01

    This document takes stock on the french gas market opening since august 2000, implementation of the 98/30/CE directive and proposes recommendations on main questions of the future gas regulations. These questions concern the situation and forecast of the competition in Europe, the access tariffing to the transport networks and to the liquefied natural gas installations, the modalities of the network access for the third (ATR), the juridical aspects. (A.L.B.)

  20. Solar heating and hot water system installed at James Hurst Elementary School, Portsmouth, Virginia

    Science.gov (United States)

    1981-01-01

    Solar heating and a hot water system installed in an elementary school in Portsmouth, Virginia are examined. The building is zoned into four heating/cooling areas. Each area is equipped with an air handling unit that is monitored and controlled by central control and monitoring system. The solar system for the building uses a collector area of 3,630 sq. ft. of flat plate liquid collectors, and a 6,000 gallon storage tank. System descriptions, maintenance reports, detailed component specifications, and design drawings to evaluate this solar system are reported.

  1. High-pressure gas-breakthrough apparatus and a procedure for determining the gas-breakthrough pressure of compacted clay

    International Nuclear Information System (INIS)

    Hume, H.B.

    1997-08-01

    Gas may be produced in a nuclear fuel waste disposal vault. Given that the vault will be sealed with clay-based materials, the fate of the gas is uncertain. Therefore, an instrument was previously built to measure the pressure required to pass gas through compacted clay materials (a gas-breakthrough apparatus). However, the 10 MPa pressure limit of the apparatus was insufficient to test compacted buffer material at the density proposed in the Canadian concept for nuclear fuel waste disposal. Therefore, a high-pressure (50 Wa) gas-breakthrough apparatus was designed, constructed and installed. This report describes the components of the apparatus and the materials and procedures that are used for the gas-breakthrough tests. (author)

  2. Occupational risk of building construction

    International Nuclear Information System (INIS)

    Aneziris, O.N.; Topali, E.; Papazoglou, I.A.

    2012-01-01

    This paper presents the quantification of occupational risk of a building construction project. Risk assessment is based on the Occupational Risk Model (ORCA) developed under the Workgroup Occupational Risk Model project (WORM), in the Netherlands, for quantifying occupational risk. This model assesses occupational risk of a worker, by taking into account his various tasks, activities and their hazards. Risk is evaluated for three types of consequences: recoverable injury, permanent injury and death. The occupational risk model is based on a set of 63 bowties, which assess risk owing to different hazards such as fall from ladder, scaffold, roofs, falling object, struck by moving vehicle, contact by moving parts, etc. ORCA calculates the risk profile of a building construction site, consisting of thirty-eight workers in different job positions, such as operators of excavators, loaders, compaction equipment, workers in excavation and framing phases, etc. All risk profiles of workers have been quantified and jobs have been ranked according to their risk. Workers installing timber formworks have the highest fatality risk (1.57×10 −3 /yr), followed by the workers installing reinforcement (1.52×10 −3 /yr).

  3. In situ water and gas injection experiments performed in the Hades Underground Research Facility

    Energy Technology Data Exchange (ETDEWEB)

    Volckaert, G.; Ortiz, L.; Put, M. [SCK-CEN, Mol (Belgium). Geological Waste Disposal Unit

    1995-12-31

    The movement of water and gas through plastic clay is an important subject in the research at SCK-CEN on the possible disposal of high level radioactive waste in the Boom clay layer at Mol. Since the construction of the Hades underground research facility in 1983, SCK-CEN has developed and installed numerous piezometers for the geohydrologic characterization and for in situ radionuclide migration experiments. In situ gas and water injection experiments have been performed at two different locations in the underground laboratory. The first location is a multi filter piezometer installed vertically at the bottom of the shaft in 1986. The second location is a three dimensional configuration of four horizontal multi piezometers installed from the gallery. This piezometer configuration was designed for the MEGAS (Modelling and Experiments on GAS migration through argillaceous rocks) project and installed in 1992. It contains 29 filters at distances between 10 m and 15 m from the gallery in the clay. Gas injection experiments show that gas breakthrough occurs at a gas overpressure of about 0.6 MPa. The breakthrough occurs by the creation of gas pathways along the direction of lowest resistance i.e. the zone of low effective stress resulting from the drilling of the borehole. The water injections performed in a filter -- not used for gas injection -- show that the flow of water is also influenced by the mechanical stress conditions. Low effective stress leads to higher hydraulic conductivity. However, water overpressures up to 1.3 MPa did not cause hydrofracturing. Water injections performed in a filter previously used for gas injections, show that the occluded gas hinders the water flow and reduces the hydraulic conductivity by a factor two.

  4. Retrofits for Energy Efficient Office Buildings: Integration of Optimized Photovoltaics in the Form of Responsive Shading Devices

    Directory of Open Access Journals (Sweden)

    Hardi K. Abdullah

    2017-11-01

    Full Text Available This study presents a retrofit strategy: integrating optimized photovoltaics (PV in the form of responsive shading devices using a dual-axis solar tracking system. A prototype-based model was fabricated to compare the efficiency of PV in this implementation with the conventional fixed installation. The office building, T1 Empire World in Erbil, was selected as a retrofit case study and for the application of the proposed integration system. In order to assess the effectiveness of the proposed retrofit method, the energy performance of the base case is simulated to be compared later with the energy performance simulations after the integration technique. The amount of generated electricity from the PV surfaces of the integrated shading elements is calculated. The energy simulations were performed using OpenStudio® (NREL, Washington, DC, USA, EnergyPlusTM (NREL, Washington, DC, USA, and Grasshopper/ Ladybug tools in which the essential results were recorded for the baseline reference, as well as the energy performance of the retrofitted building. The results emphasize that the PV-integrated responsive shading devices can maximize the efficiency of PV cells by 36.8% in comparison to the fixed installation. The integrated system can provide approximately 15.39% of the electricity demand for operating the building. This retrofit method has reduced the total site energy consumption by 33.2% compared to the existing building performance. Total electricity end-use of the various utilities was lowered by 33.5%, and the total natural gas end-use of heating demand was reduced by 30.9%. Therefore, the percentage reduction in electricity cooling demand in July and August is 42.7% due to minimizing the heat gain in summer through blocking the sun’s harsh rays from penetrating into interior spaces of the building. In general, this system has multiple benefits, starting with being extremely efficient and viable in generating sustainable alternative energy

  5. To fully exert the important role of natural gas in building a modern energy security system in China: An understanding of China's National l3th Five-Year Plan for Natural Gas Development

    Directory of Open Access Journals (Sweden)

    Zhen Wang

    2017-07-01

    Full Text Available Along with the introduction of 13th Five-Year Plans in succession for natural gas development programmed by governments at all levels and much more attention paid to haze governance by relevant departments, natural gas, as one of the major energy sources, has ushered in a strategic opportunity era. In view of this, based upon China's National 13th Five-Year Plan for Natural Gas Development formulated by the National Development and Reform Commission, the developing trend of natural gas sector was predicted in the period of 13th Five-Year Plan in terms of supply side, demand side, pricing system, infrastructure construction, etc. and some feasible proposals were made on the whole industrial chain. In terms of the supply side, natural gas will be of availability, accessibility, assurance, affordability, and accountability in the production and supply chains. In terms of the demand side, air pollution treatment will indirectly stimulate gas consumption increase. Gas power generation will become the dominant. Natural gas as a transportation fuel will bring a good new opportunity. Thus it is believed that as the present natural gas development is restricted by both gas pricing system and infrastructure construction, further reform should be strengthened to break the barriers of systems and mechanisms; and that due to many uncertainties in the natural gas market, the decisive role of market in the resource allocation should be fully exerted to ensure the main force of natural gas in building a dependable energy strategic system in present and future China.

  6. Procedure for qualification of electric equipment installed in containments for pressurized water reactors subject to accident conditions

    International Nuclear Information System (INIS)

    1991-11-01

    This generic norm is usable for electrical equipment installed in containment building of PWR subject to accidental conditions. She defines the qualification methods and the general rules usable for the test specifications of qualification for these materials

  7. Performance evaluation of radiant cooling system application on a university building in Indonesia

    Science.gov (United States)

    Satrio, Pujo; Sholahudin, S.; Nasruddin

    2017-03-01

    The paper describes a study developed to estimate the energy savings potential of a radiant cooling system installed in an institutional building in Indonesia. The simulations were carried out using IESVE to evaluate thermal performance and energy consumption The building model was calibrated using the measured data for the installed radiant system. Then this calibrated model was used to simulate the energy consumption and temperature distribution to determine the proportional energy savings and occupant comfort under different systems. The result was radiant cooling which integrated with a Dedicated Outside Air System (DOAS) could make 41,84% energy savings compared to the installed cooling system. The Computational Fluid Dynamics (CFD) simulation showed that a radiant system integrated with DOAS provides superior human comfort than a radiant system integrated with Variable Air Volume (VAV). Percentage People Dissatisfied was kept below 10% using the proposed system.

  8. Research methods of the parameters of residential buildings construction

    Directory of Open Access Journals (Sweden)

    Grigor’ev Vladimir Aleksandrovich

    -choice. Therefore, variants with minimum and maximum values can be regarded as supporting. The researches showed that the difference between them is not so much in the technological scheme of construction, but in the gap between design and practical solutions. When creating an enlarged model of multisectional residential building construction we should keep in mind the following circumstances: a part of a residential building up to 6 sections is a section, and up to 4 sections - a division; selection of a division size is determined both by adjacent associated activities (sealing and embedment of joints, partitions creation, plumbing works, etc. and economic conditions (the cost of tooling, additional financial support, etc.; technological sequence of precast concrete structures installation can be applied depending on the design and space-planning decisions; floor assembling begins with panels of external walls with significant labor input when terminating their seams; installation of panels should closely match the tolerances of bottom and top; the process of installing concrete structures should be monitored using geodetic laser technologies (LT, LN, LSZ, etc.; elevators installation is advisable to carry out at the same time with the precast concrete structures installation on the areas free of installation.

  9. Lifetime environmental impact of buildings

    CERN Document Server

    Mequignon, Marc

    2014-01-01

    This work discusses the impact of the life of buildings on? sustainable development methods.?The study of the lifespan of the building is used to assess and?manage the environmental impacts associated?with all the stages of a product's life, from raw material extraction?through to repair, maintenance and?? 'end of life' scenarios. While several papers have discussed thegreenhouse gas emissions of buildings,?less research has been done on how these are affected by the lifespan?of the building. This book serves to?highlight the pertinence of this factor and contributes to providing?new ideas on

  10. Positional Arrangements of Waste Exhaust Gas Ducts of C-Type Balanced Chimney Heating Devices on Building Façades

    Directory of Open Access Journals (Sweden)

    Erkan AVLAR

    2009-01-01

    Full Text Available In Turkey today, with the increase in availability of natural gas,detached heating devices are being preferred over existingheating devices. Due to the lack of chimneys in existing buildingsin Turkey or the presence of chimneys that fail to conformto standards, the use of C-type balanced chimney devices has increased.C-type balanced chimney devices take the combustionair directly from the outside by a specific air duct as detachedheating equipment, with enclosed combustion chambers anda specific waste gas exhaust duct, and they are ventilated independentlyof the field of equipment. Because of their essentiality,the use of a chimney is not required in these devices;the waste gas is exhausted through walls, windows, doors, orbalconies. The natural gas is a clean fossil fuel that requires nostorage in buildings and is easy to use. However, water vapor,carbon dioxide and nitrogen oxides are produced by the combustionof natural gas. It is widely known that high concentrationsof these products can have some adverse effects onhumans such as dizziness, headaches and nausea. As a result,the waste products could recoil through wall openings on thefaçade to create unhealthy indoor environments that could bedangerous to human health. Therefore, the importance of standardsand regulations about the positional arrangements of thewaste gas exhaust ducts of C-type balanced chimney devices onbuilding façades is increasing. In this research, we analyze thestudies of the Institution of Turkish Standards, Chamber of MechanicalEngineers, gas distribution companies, municipalitiesand authorized firms and compare the criteria to determine thenecessary application method. According to our comparison ofthe references accessed, the criteria are not uniform.

  11. Safeguard of public safety in domestic gas appliances utilisation; La tutela della pubblica incolumita` nell`utilizzo degli apparecchi alimentati a gas per uso domestico

    Energy Technology Data Exchange (ETDEWEB)

    Benedetti, G. [Milan, Procura/Pretura (Italy)

    1998-09-01

    With reference to Law No. 1083/71, the article deals with the liabilities in which domestic gas plant installers may incur if technical standards on installation are disregarded. Data on carbon monoxide intoxication and accidents with gas plants or appliances collected from May 1996 to April 1997 by the Lombardy Region are reported. The article describes the procedures followed by the Public Prosecutor, Local Health Units or other authorities whenever serious accidents due to bad functioning of gas plants or appliances occur. Comments are made on a circular letter on gas appliances issued by the Attorney General`s Office, in which the most common hazards with plants are listed, and the interventions made by Attorney General - in case of CO intoxication or threat to public health and safety - are described. Special considerations are made on the monitoring activities carried out by Local Health Units in case of both prompt intervention and ordinary maintenance of gas installations. The responsibilities undertaken by the installers (along with the relevant liabilities) in case of a false Declaration of Conformity is issued are examined. Finally, stress is laid upon meeting the deadline established by Law No. 46/90 on the adaptation of existing gas installations to safety standards. [Italiano] L`articolo esamina, alla luce delle disposizioni di cui alla Legge 1083/71, le responsabilita` che competono all`installatore, qualora, nell`atto della messa in opera di impianti domestici del gas, trascuri di applicare la normativa tecnica. Successivamente vengono esaminati i dati relativi a casi di intossicazione da ossido di carbonio e ad incidenti derivanti da impianti o da apparecchi a gas raccolti nel periodo maggio 1996 - aprile 1997 dalla Regione Lombardia. L`articolo prosegue descrivendo le procedure seguite dal Pubblico Ministero, dalle ASL o da altri soggetti istituzionali in occasione di gravi incidenti derivanti dal malfunzionamento di impianti o di apparecchi a gas

  12. Energy audit role in building planning

    Science.gov (United States)

    Sipahutar, Riman; Bizzy, Irwin

    2017-11-01

    An energy audit is one way to overcome the excessive use of energy in buildings. The increasing growth of population, economy, and industry will have an impact on energy demand and the formation of greenhouse gas emissions. Indonesian National Standard (SNI) concerning the building has not been implemented optimally due to the socialization process by a government not yet been conducted. An energy audit of buildings has been carried out at offices and public services. Most electrical energy in buildings used for air refresher equipment or air conditioning. Calculation of OTTV has demonstrated the importance of performing since the beginning of the planning of a building to get energy-efficient buildings.

  13. 16th edition IEE wiring regulations design and verification of electrical installations

    CERN Document Server

    Scaddan, Brian

    1995-01-01

    This book builds on the basic knowledge and techniques covered in 16th Edition IEE Wiring Regulations Explained and Illustrated, providing the information and revision materials needed for the City & Guilds 2400 (Design, Erection and Verification ofElectrical Installations) exam. All Qualifying Managers will be required to gain this qualification, and Brian Scaddan's book is the ideal text for all students undertaking C&G 2400 courses.

  14. Eco-technology service station: the future of gas station; Posto eco-tecnologico: o posto do futuro

    Energy Technology Data Exchange (ETDEWEB)

    Moura, Newton R. [PETROBRAS, Rio de Janeiro, RJ (Brazil); Daher, Humberto Antonio S. [PETROBRAS Distribuidora, Rio de Janeiro, RJ (Brazil)

    2004-07-01

    PETROBRAS Distribuidora and CENPES have a project to build an eco-technology service station at Ilha do Fundao, to know new technologies for vehicle fuelling, test of new vehicle natural gas compression system, and start projects with new fuels that are not available at Brazilian market. This service station concept shall be aligned with sustainability premise that are being established for both companies, that means, besides a technology focus, it shall have a social focus without any environment damage. PETROBRAS 'Board of Directors approved the expansion of PETROBRAS' Research and Development Center (CENPES) installations, including this service station construction. Some activities that will be developed at the service station are pointed out here: available of new natural gas compression system; micro-generation with micro turbine, fuel cell; and photo-voltaic cell technologies; hydrogen fuelling; oil-water system treatment; biodiesel fuelling. This station will have a show room opened to the public, with panels, videos and a CNG compressor in cut. (author)

  15. Having the last gas

    Energy Technology Data Exchange (ETDEWEB)

    Freestone, N P; Phillips, P S; Hall, R [Nene College of Higher Education, Northampton (United Kingdom)

    1994-01-01

    Millions of visitors to the 1985 International Garden Festival in Liverpool were probably unaware that the landscape gardens they had come to enjoy were on top of approximately 10m t of domestic rubbish. Nor were they aware that this rubbish was generating a methane-rich gas that had necessitated installing a special extraction system to remove it from the site. At first this gas - landfill gas - was simply flared (burnt), but once it was realised that extraction would be need for at least 15 years it was decided to use the gas to generate electricity. This development is a good example of the potential, especially in the developed world, for using landfill gas produced in refuse tips as an additional and versatile energy source. This potential is analysed and the problems of exploitation examined. (2 figures). (author)

  16. Commercial gas utilization in the Netherlands. Six years of the Marketing Plan Public Gas Supply (MOG)

    International Nuclear Information System (INIS)

    Hoelen, Q.E.J.J.M.; Bartholomeus, P.H.J.; Mallon, W.Ch.

    1998-01-01

    In 1992, Gasunie (Dutch natural gas trading company) started its marketing plan for the public natural gas supply (MOG, abbreviated in Dutch). The aim is to promote the use of natural gas in cooperation with gas utilities. For the commercial sector many different gas appliances are available: high-efficiency deep-frying pans for the catering sector, gas-fired air humidifiers for office and public buildings, gas-fired tumble dryers for small and medium-sized businesses, etc

  17. Seismic Response of a Half-Scale Masonry Building with Flexible Diaphragms

    National Research Council Canada - National Science Library

    Sweeney, Steven C; Horney, Matthew A; Orton, Sarah L

    2005-01-01

    Unreinforced masonry (URM) buildings constructed on Army installations before the development of modern seismic codes may be susceptible to earthquake damage and therefore could benefit from seismic mitigation measures...

  18. Water and power installation for Lanzarote (Canary Islands) Spain

    Energy Technology Data Exchange (ETDEWEB)

    Krebs, F.

    1977-03-01

    Water producing and electrical generating facilities had to be increased on the Spanish Canary Island of Lanzarote for it to develop beyond its 1972 status. The Ministry of Public Works, prepared specifications for a turnkey installation of two 2500 M/sup 3//D desalting plants and a 5 MW (net) generating system. In 1973 through international competition Babcock and Wilcox, Espanola won a contract to build the installation. In December 1975 the construction of the project was completed. In early January 1976 the first line was producing 103% of the rated production at a thermal efficiency of 120% of the rated value. The second line was modified to operate at a reduced maximum brine temperature and commissioned. This plant was brought to full production which was 115% of the rated production in 2/sup 1///sub 2/ days. Problems and delays during the commissioning, were minimal. A 5 days performance test of the installation was run. During this test the water production was 111/sup 1///sub 2/% of the rated value at a specific energy consumption of 93% of the rated value while the maximum brine temperature was maintained 6/sup 0/C less than the design value. The high performances were achieved because the plants were well designed and built and properly commissioned. During the first 4/sup 1///sub 2/ months that the owner operated the installation it provided water and power as demanded. During that time the average plant production was 107% of the rated capacity.

  19. 49 CFR 393.69 - Liquefied petroleum gas systems.

    Science.gov (United States)

    2010-10-01

    ... Protection Association, Battery March Park, Quincy, MA 02269, as follows: (1) A fuel system installed before... ACCESSORIES NECESSARY FOR SAFE OPERATION Fuel Systems § 393.69 Liquefied petroleum gas systems. (a) A fuel system that uses liquefied petroleum gas as a fuel for the operation of a motor vehicle or for the...

  20. The importance of correctly maintaining HVAC installations and energy management in the hotel sector

    International Nuclear Information System (INIS)

    Acosta Molero, P.

    2016-01-01

    The optimum maintenance of installations in hotel establishments is becoming increasingly necessary given the complexity and diversity of this type of buildings, with the aim of being efficient in the use of the resources that they consume, such as water and energy. From the owners of the establishments and the companies responsible for the hotel management, to the clients that stay in them, it is vitally important that the operation of its installations is guaranteed at all times, particularly as regards temperature control. Proper preventive maintenance therefore plays an essential role in ensuring that the hotel guests’ experience is as positive as possible. (Author)

  1. Broad Overview of Energy Efficiency and Renewable Energy Opportunities for Department of Defense Installations

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, E.; Antkowiak, M.; Butt, R.; Davis, J.; Dean, J.; Hillesheim, M.; Hotchkiss, E.; Hunsberger, R.; Kandt, A.; Lund, J.; Massey, K.; Robichaud, R.; Stafford, B.; Visser, C.

    2011-08-01

    The Strategic Environmental Research and Developmental Program (SERDP)/Environmental Security Technology Certification Program (ESTCP) is the Department of Defense?s (DOD) environmental science and technology program focusing on issues related to environment and energy for the military services. The SERDP/ESTCP Office requested that the National Renewable Energy Laboratory (NREL) provide technical assistance with strategic planning by evaluating the potential for several types of renewable energy technologies at DOD installations. NREL was tasked to provide technical expertise and strategic advice for the feasibility of geothermal resources, waste-to-energy technology, photovoltaics (PV), wind, microgrids, and building system technologies on military installations. This technical report is the deliverable for these tasks.

  2. Cloud Computing and Internet of Things Concepts Applied on Buildings Data Analysis

    Directory of Open Access Journals (Sweden)

    Hebean Florin-Adrian

    2017-12-01

    Full Text Available Used and developed initially for the IT industry, the Cloud computing and Internet of Things concepts are found at this moment in a lot of sectors of activity, building industry being one of them. These are defined like a global computing, monitoring and analyze network, which is composed of hardware and software resources, with the feature of allocating and dynamically relocating the shared resources, in accordance with user requirements. Data analysis and process optimization techniques based on these new concepts are used increasingly more in the buildings industry area, especially for an optimal operations of the buildings installations and also for increasing occupants comfort. The multitude of building data taken from HVAC sensor, from automation and control systems and from the other systems connected to the network are optimally managed by these new analysis techniques. Through analysis techniques can be identified and manage the issues the arise in operation of building installations like critical alarms, nonfunctional equipment, issues regarding the occupants comfort, for example the upper and lower temperature deviation to the set point and other issues related to equipment maintenance. In this study, a new approach regarding building control is presented and also a generalized methodology for applying data analysis to building services data is described. This methodology is then demonstrated using two case studies.

  3. A reference device for evaluating the thermal behavior of installed multilayered wall containing a phase change material

    International Nuclear Information System (INIS)

    Pagliolico, S.L.; Sassi, G.; Cascone, Y.; Bongiovanni, R.M.

    2015-01-01

    Highlights: • Thermal analysis of installed wallboards embedding phase change material layer. • Simple devices and real conditions for thermal analysis toward a standardization. • Scanning calorimetric measurements as initial condition for data regression. • Bias correction of calorimetric measurements data by installation factors. • Practical approach to identify a reliable thermal curve for capacitive wallboards. - Abstract: Thermal inertia of lightweight building envelopes can be improved including phase change materials in multilayered wallboards. The thermal modeling of buildings for design purposes needs a robust description of the thermal properties of installed phase change materials. A standard method would improve the thermal characterization of commercial products. The aim of the study is to develop a simple methodology to obtain reliable thermal data for phase change materials integrated in multilayered wallboards. The methodology modifies differential scanning calorimetry measurements on phase change material by installation factors to obtain the apparent specific heat vs. temperature for the wallboard layer embedding phase change material. Simple cubic cells were realized as reference devices to simulate a confined environment. A dynamic model of heat transfer was developed to simulate the thermal behavior of devices. Installation factors were calculated by regression of the monitored temperatures inside and outside the devices operating under real environmental conditions. The apparent specific heat of phase change material, measured by differential scanning calorimetry at different rates, resulted in a spread of curves vs. temperature. Mean curves were used as initial condition for regression. The mean calculation method did not significantly affect the installed resulted curve. A unique curve of apparent specific heat vs. temperature best fit data measured over a wide range of experimental devices and conditions. Good regression

  4. Gas supply triggers development at Connaught Bridge

    Energy Technology Data Exchange (ETDEWEB)

    Jeffs, E.

    Malaysia aims to become a fully developed country by the year 2020, which means a steady 20% annual rate of growth of electricity demand to the end of the century. Much of this growth is centered in the area around Kuala Lumpur so that Tenaga Nasional Bhd (Tenaga) urgently needs to bring new generating capacity into the capital area. Access to gas on the west coast of the malay peninsula has given Tenaga Nasional Berhad the opportunity to convert their Connaught Bridge power station to a combined cycle and to install four open-cycle gas turbines. The expansion of Connaught Bridge is the first of several projects which are being developed. In early 1991, as site preparation was getting under way for the combined cycle, Tenaga ordered eight gas turbines for peak load duty from NEI-ABB Gas Turbines. Four of these are the 150 MW Type GT13E with water injection for NOx control which have been installed in parallel with the construction of the steam cycle on the Connaught Bridge site. At sea level and 32[degrees]C site ambient, these gas turbines are rated 130MW on gas for a total 520MW of peak load capacity. The last of these was synchronized on 12 October last year. There are no plans to convert these to combined cycles.

  5. Photovoltaic building blocks

    DEFF Research Database (Denmark)

    Hanberg, Peter Jesper; Jørgensen, Anders Michael

    2014-01-01

    efficiency of about 15% for commercial Silicon solar cells there is still much to gain. DTU Danchip provides research facilities, equipment and expertise for the building blocks that comprises fabricating the efficient solar cell. In order to get more of the sun light into the device we provide thin film......Photovoltaics (PV), better known as solar cells, are now a common day sight on many rooftops in Denmark.The installed capacity of PV systems worldwide is growing exponentially1 and is the third most importantrenewable energy source today. The cost of PV is decreasing fast with ~10%/year but to make...... it directcompetitive with fossil energy sources a further reduction is needed. By increasing the efficiency of the solar cells one gain an advantage through the whole chain of cost. So that per produced Watt of power less material is spent, installation costs are lower, less area is used etc. With an average...

  6. The Advanced Gas Centrifuge program

    International Nuclear Information System (INIS)

    Riepe, R.

    1984-01-01

    Although the gas centrifuge process for uranium enrichment is often referred to as a ''new technology,'' it has been under development for approximately 25 years to bring it to its current state of deployment. Centrifuges are now being installed in a new gas centrifuge enrichment plant (GCEP) at Portsmouth, Ohio. The objective of this new plant was to provide additional U.S. uranium enrichment capacity at a production cost comparable to the U.S. diffusion process but requiring much less power per separative work unit (SWU) produced. The current, commercial scale centrifuge technology being installed meets that objective. The objective for new U.S. enrichment capacity has changed. The objective is not to provide more SWUs but to provide cheaper SWUs. The objective is to make the U.S. uranium enrichment enterprise competitive on the international market. Where the U.S. at one time supplied virtually all of the free world SWU demand, the U.S. market share has now dropped to approximately 35% of the foreign free world market. The Advanced Gas Centrifuge (AGC) program provides an avenue for making the U.S. the economically attractive, reliable enrichment supplier

  7. Gas insulated substations

    CERN Document Server

    2014-01-01

    This book provides an overview on the particular development steps of gas insulated high-voltage switchgear, and is based on the information given with the editor's tutorial. The theory is kept low only as much as it is needed to understand gas insulated technology, with the main focus of the book being on delivering practical application knowledge. It discusses some introductory and advanced aspects in the meaning of applications. The start of the book presents the theory of Gas Insulated Technology, and outlines reliability, design, safety, grounding and bonding, and factors for choosing GIS. The third chapter presents the technology, covering the following in detail: manufacturing, specification, instrument transformers, Gas Insulated Bus, and the assembly process. Next, the book goes into control and monitoring, which covers local control cabinet, bay controller, control schemes, and digital communication. Testing is explained in the middle of the book before installation and energization. Importantly, ...

  8. Retrofit energy conservation in residential buildings in southern California

    Science.gov (United States)

    Turner, R. H.; Birur, G. C.; Daksla, C.

    1982-01-01

    The common energy conservation techniques (ECTs) that can be retrofit-installed into residential buildings are surveyed. The quantity of saved energy for heating and cooling attributable to each ECT is evaluated for three common modes of heating: natural gas heating at 60/therm; heating via heat pump at $1.20/therm; and electric resistance heating at $2.40/therm. In every case, a life cycle cost comparison is made between the long term revenue due to energy conservation and a safe and conventional alternative investment that might be available to the prudent homeowner. The comparison between investment in an ECT and the alternative investment is brought into perspective using the life cycle payback period and an economic Figure of Merit (FOM). The FOM allows for relative ranking between candidate ECTs. Because the entire spectrum of winter heating climates in California is surveyed, the decision maker can determine whether or not a considered ECT is recommended in a given climate, and under what conditions an ECT investment becomes attractive.

  9. Analysis of a school building damaged by the 2015 Ranau earthquake Malaysia

    Science.gov (United States)

    Takano, Shugo; Saito, Taiki

    2017-10-01

    On June 5th, 2015 a severe earthquake with a moment Magnitude of 6.0 occurred in Ranau, Malaysia. Depth of the epicenter is 10 km. Due to the earthquake, many facilities were damaged and 18 people were killed due to rockfalls [1]. Because the British Standard (BS) is adopted as a regulation for built buildings in Malaysia, the seismic force is not considered in the structural design. Therefore, the seismic resistance of Malaysian buildings is unclear. To secure the human life and building safety, it is important to grasp seismic resistance of the building. The objective of this study is to evaluate the seismic resistance of the existing buildings in Malaysia built by the British Standard. A school building that was damaged at the Ranau earthquake is selected as the target building. The building is a four story building and the ground floor is designed to be a parking space for the staff. The structural types are infill masonries where main frame is configured by reinforced concrete columns and beams and brick is installed inside the frame as walls. Analysis is performed using the STERA_3D software that is the software to analyze the seismic performance of buildings developed by one of the authors. Firstly, the natural period of the building is calculated and compared with the result of micro-tremor measurement. Secondly, the nonlinear push-over analysis was conducted to evaluate the horizontal load bearing capacity of the building. Thirdly, the earthquake response analysis was conducted using the time history acceleration data measured at the Ranau earthquake by the seismograph installed at Kota Kinabalu. By comparing the results of earthquake response analysis and the actual damage of the building, the reason that caused damage to the building is clarified.

  10. The latest electrical installation (I)

    International Nuclear Information System (INIS)

    Won, Jong Su

    1976-04-01

    This book deals with the latest electrical installation. The contents of this book are construction electrical installation, regulations related electrical installation, foundation and principle of wiring, main line feeder, lighting installation, power of wiring, main line feeder, lighting installation, power installation, method to read structure drawing for electrical construct drawing electric lamp wiring diagram, working drawing, material and tools and method of construction of electrical installation on types of wiring construction, metallic conduit, rigid poly-vinyl conduit wiring, bus duct work, cable work and insulation out of metal lathed.

  11. Rapid gas development in the Fayetteville shale basin, Arkansas

    Science.gov (United States)

    Advances in drilling and extraction of natural gas have resulted in rapid expansion of wells in shale basins. The rate of gas well installation in the Fayetteville shale is 774 wells a year since 2005 with thousands more planned. The Fayetteville shale covers 23,000 km2 although ...

  12. The Evaluation of personnel radiation dose and society radiation on RSG-GAS around as proposal determination of ALARA value

    International Nuclear Information System (INIS)

    Pande Made Udiyani; Puradwi IW

    2007-01-01

    Each nuclear installation to achieve radiation safety has to meet the ALARA concepts. The ALARA value of a nuclear installation should be enacted by regulator body. ALARA value can be determined by evaluation radiation exposure and dose acceptance of nuclear installation operation. As case study in Indonesia, ALARA assessment in nuclear installation is done at RSG-GAS reactor. Intention of this research is to determine gyration reference assess ALARA by evaluate radiation dose acceptance by RSG-GAS radiation personnel and the influence of RSG-GAS operation to presentation of radiation accepted by society which living around its. ALARA of RSG-GAS determined based on evaluation of measurement data of the radiation doses which is accepted by personnel radiation. While evaluation of radiation doses which is accepted by society in the radius 5 km of the RSG-GAS conducted to data result of calculation using program package of CAP-88 and measurement result with method of carborne survey. Result of radiation dose evaluation obtained which not pass dose definition for the radiation worker that is 50 mSv/year, and for society around RSG-GAS that is 5 mSv/year. Based on the result of evaluation hence obtained value of ALARA for RSG-GAS in value of gyration 17 - 50 mSv/year. (author)

  13. FN-tandem accelerator in Bucharest after the seismic protection system installation

    International Nuclear Information System (INIS)

    Marinescu, L.; Petrascu, M.; Dima, R.; Serban, D.

    1996-01-01

    Subsequent to the installation of the seismic protection system in the HVEC FN-tandem accelerator in Bucharest, observations have been made of the efficiency of the protection devices. Performance and improvements of the new voltage divider are discussed. The SF 6 content of the insulating gas is shown to be conveniently measured using the elastic recoil technique and a robust ioniser heater is described for the HICONEX source. (orig.)

  14. The Synchrocyclotron (SC) in building 300

    CERN Multimedia

    Maximilien Brice

    2012-01-01

    The red magnet of CERN's first accelerator, the Synchrocyclotron (SC), has occupied a large part of Hall 300 since it was installed in the late 1950s. The remaining part of the 300-square-metre building has been used as a storage room since the accelerator was shut down in 1990. Now a public exhibition will breathe new life into the hall.

  15. Building Energy Codes: Policy Overview and Good Practices

    Energy Technology Data Exchange (ETDEWEB)

    Cox, Sadie [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-02-19

    Globally, 32% of total final energy consumption is attributed to the building sector. To reduce energy consumption, energy codes set minimum energy efficiency standards for the building sector. With effective implementation, building energy codes can support energy cost savings and complementary benefits associated with electricity reliability, air quality improvement, greenhouse gas emission reduction, increased comfort, and economic and social development. This policy brief seeks to support building code policymakers and implementers in designing effective building code programs.

  16. Solar heating and hot water system installed at Cherry Hill, New Jersey

    Science.gov (United States)

    1979-01-01

    The solar heating and hot water system installed in existing buildings at the Cherry Hill Inn in Cherry Hill, New Jersey is described in detail. The system is expected to furnish 31.5% of the overall heating load and 29.8% of the hot water load. The collectors are liquid evacuated tube type. The storage system is an above ground insulated steel water tank with a capacity of 7,500 gallons.

  17. Leader completes installation of process water evaporation system

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2005-11-01

    The installation of a patent-pending evaporation system at a facility in northeast British Columbia was discussed. The system captures excess waste exhaust heat from natural gas-fired compressor engines and is used to evaporate process water. The disposal of process water is a major cost in the production of natural gas and is usually hauled and disposed at water disposal wells located off-site. The cost to truck and dispose of the water at the facility was estimated at between $30 to $40 per cubic metre. The evaporation system can evaporate 4 to 8 cubic metres of process water every 24 hours and has an estimated useful life of 20 years. The evaporator relies on heat that would otherwise be expelled directly into the atmosphere, and the systems are expected to provide substantial savings. A wide-ranging manufacturing and marketing strategy was expected to commence by the end of 2005. With rising energy prices, operators of facilities are seeking more efficient ways of managing energy needs. The system was created by Leader Energy Services Ltd., a company that provides essential field services for oil and gas well stimulation in Alberta.

  18. Intelligent building operating technologies : a cost-effective reduction in building energy consumption[Business case for a climate change solution]. 2. ed.

    Energy Technology Data Exchange (ETDEWEB)

    Gilles, J.

    2004-04-01

    Much of the energy consumed in the commercial and institutional (C and I) buildings sector is wasted due to poor building operation. The sector accounts for 13 per cent of secondary energy use in Canada, and contributes about the same proportion of greenhouse gas (GHG) emissions. Energy use in this sector could be reduced if the operation of the buildings were improved. The CANMET Energy Technology Centre in Varennes, Quebec has developed a set of software solutions called Intelligent Building Operating Technologies to address this problem. The software program applies artificial intelligence algorithms to existing building energy management control systems to diagnose equipment and system problems. The software provides performance reports and allows the operator to optimize the operation of the building. The proposed control strategies could be applied to 60 per cent of the building surface area in Canada, resulting energy consumption reductions of 12 per cent annually, or 14 TWh of electricity and 1.5 billion cubic metres of natural gas. The savings amount to $1.8 billion and 7 Mt of GHG emissions annually. It was suggested that a national retro-commissioning program would eliminate the barriers to improving building operation and help research and development aimed at Intelligent Building Operating Technologies. 8 refs., 5 tabs., 3 figs.

  19. Investigations of gas entrainment in KNK II

    International Nuclear Information System (INIS)

    Hoppe, P.; Massier, H.; Mitzel, F.; Vaeth, W.

    1979-08-01

    During commissioning of KNK II operational difficulties were encountered due to gas entrainment in the coolant. This gas entrainment caused negative reactivity fluctuations which tripped the reactor repeatedly. Since first investigations indicated one main cause of the gas entrainment and the existence of an accumulation process, a technical modification (installation of a throttle valve) for remedy was performed. This report describes the investigations made after the plant modification. The main objective was to test the effectiveness of the modifications and to look into the following still open problems: Localization of the gas storage, detection and estimation of a permanent gas entrainment and the analysis of positive power overshoots being observed in connection with the gas bubbles

  20. Sizing Combined Heat and Power Units and Domestic Building Energy Cost Optimisation

    Directory of Open Access Journals (Sweden)

    Dongmin Yu

    2017-06-01

    Full Text Available Many combined heat and power (CHP units have been installed in domestic buildings to increase energy efficiency and reduce energy costs. However, inappropriate sizing of a CHP may actually increase energy costs and reduce energy efficiency. Moreover, the high manufacturing cost of batteries makes batteries less affordable. Therefore, this paper will attempt to size the capacity of CHP and optimise daily energy costs for a domestic building with only CHP installed. In this paper, electricity and heat loads are firstly used as sizing criteria in finding the best capacities of different types of CHP with the help of the maximum rectangle (MR method. Subsequently, the genetic algorithm (GA will be used to optimise the daily energy costs of the different cases. Then, heat and electricity loads are jointly considered for sizing different types of CHP and for optimising the daily energy costs through the GA method. The optimisation results show that the GA sizing method gives a higher average daily energy cost saving, which is 13% reduction compared to a building without installing CHP. However, to achieve this, there will be about 3% energy efficiency reduction and 7% input power to rated power ratio reduction compared to using the MR method and heat demand in sizing CHP.