  1. Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility

    International Nuclear Information System (INIS)

    1993-08-01

    The 200 Area Effluent Treatment Facility Dangerous Waste Permit Application documentation consists of both Part A and a Part B permit application documentation. An explanation of the Part A revisions associated with this treatment and storage unit, including the current revision, is provided at the beginning of the Part A section. Once the initial Hanford Facility Dangerous Waste Permit is issued, the following process will be used. As final, certified treatment, storage, and/or disposal unit-specific documents are developed, and completeness notifications are made by the US Environmental Protection Agency and the Washington State Department of Ecology, additional unit-specific permit conditions will be incorporated into the Hanford Facility Dangerous Waste Permit through the permit modification process. All treatment, storage, and/or disposal units that are included in the Hanford Facility Dangerous Waste Permit Application will operate under interim status until final status conditions for these units are incorporated into the Hanford Facility Dangerous Waste Permit. The Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility contains information current as of May 1, 1993

  2. Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility

    Energy Technology Data Exchange (ETDEWEB)

    1993-08-01

    The 200 Area Effluent Treatment Facility Dangerous Waste Permit Application documentation consists of both Part A and a Part B permit application documentation. An explanation of the Part A revisions associated with this treatment and storage unit, including the current revision, is provided at the beginning of the Part A section. Once the initial Hanford Facility Dangerous Waste Permit is issued, the following process will be used. As final, certified treatment, storage, and/or disposal unit-specific documents are developed, and completeness notifications are made by the US Environmental Protection Agency and the Washington State Department of Ecology, additional unit-specific permit conditions will be incorporated into the Hanford Facility Dangerous Waste Permit through the permit modification process. All treatment, storage, and/or disposal units that are included in the Hanford Facility Dangerous Waste Permit Application will operate under interim status until final status conditions for these units are incorporated into the Hanford Facility Dangerous Waste Permit. The Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility contains information current as of May 1, 1993.

  3. Hanford Facility RCRA permit handbook

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    Purpose of this Hanford Facility (HF) RCRA Permit Handbook is to provide, in one document, information to be used for clarification of permit conditions and guidance for implementing the HF RCRA Permit.

  4. Storm water permitting for oil and gas facilities

    International Nuclear Information System (INIS)

    de Blanc, P.C.

    1991-01-01

    After several false starts, the US Environmental Protection Agency (EPA) published new federal storm water regulations in the November 16, 1990 Federal Register. These regulations identify facilities which must apply for a storm water permit and detail permit application requirements. The regulations appear at 40 CFR 122 Subpart B and became effective December 17, 1990. An outline of these regulations and their applicability to oil and gas facilities is presented. They are: facilities which require a storm water permit; types of storm water permits; permit application deadlines; permit application forms; facilities with existing storm water permits; storm water permit application data requirements; storm water sampling and analysis requirements; and EPA contacts for additional information

  5. Upgrades to meet LANL SF, 121-2011, hazardous waste facility permit requirements

    International Nuclear Information System (INIS)

    French, Sean B.; Johns-Hughes, Kathryn W.

    2011-01-01

    Members of San IIdefonso have requested information from LANL regarding implementation of the revision to LANL's Hazardous Waste Facility Permit (the RCRA Permit). On January 26, 2011, LANL staff from the Waste Disposition Project and the Environmental Protection Division will provide a status update to Pueblo members at the offices of the San IIdefonso Department of Environmental and Cultural Preservation. The Waste Disposition Project presentation will focus on upgrades and improvements to LANL waste management facilities at TA-50 and TA-54. The New Mexico Environment Department issued LANL's revised Hazardous Waste Facility permit on November 30, 2010 with a 30-day implementation period. The Waste Disposition Project manages and operates four of LANL's permitted facilities; the Waste Characterization, Reduction and Repackaging Facility (WCRRF) at TA-SO, and Area G, Area L and the Radioassay and Nondestructive Testing facility (RANT) at TA-54. By implementing a combination of permanent corrective action activities and shorter-term compensatory measures, WDP was able to achieve functional compliance on December 30, 2010 with new Permit requirements at each of our facilities. One component of WOP's mission at LANL is centralized management and disposition of the Laboratory's hazardous and mixed waste. To support this mission objective, WOP has undertaken a project to upgrade our facilities and equipment to achieve fully compliant and efficient waste management operations. Upgrades to processes, equipment and facilities are being designed to provide defense-in-depth beyond the minimum, regulatory requirements where worker safety and protection of the public and the environment are concerned. Upgrades and improvements to enduring waste management facilities and operations are being designed so as not to conflict with future closure activities at Material Disposal Area G and Material Disposal Area L.

  6. Hanford facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-01-01

    This document, Set 2, the Hanford Facility Dangerous Waste Part B Permit Application, consists of 15 chapters that address the content of the Part B checklists prepared by the Washington State Department of Ecology (Ecology 1987) and the US Environmental Protection Agency (40 CFR 270), with additional information requirements mandated by the Hazardous and Solid Waste Amendments of 1984 and revisions of WAC 173-303. For ease of reference, the Washington State Department of Ecology checklist section numbers, in brackets, follow the chapter headings and subheadings. This permit application contains ''umbrella- type'' documentation with overall application to the Hanford Facility. This documentation is broad in nature and applies to all TSD units that have final status under the Hanford Facility Permit

  7. Hanford Facility dangerous waste permit application, liquid effluent retention facility and 200 area effluent treatment facility

    International Nuclear Information System (INIS)

    Coenenberg, J.G.

    1997-01-01

    The Hanford Facility Dangerous Waste Permit Application is considered to 10 be a single application organized into a General Information Portion (document 11 number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the 12 Unit-Specific Portion is limited to Part B permit application documentation 13 submitted for individual, 'operating' treatment, storage, and/or disposal 14 units, such as the Liquid Effluent Retention Facility and 200 Area Effluent 15 Treatment Facility (this document, DOE/RL-97-03). 16 17 Both the General Information and Unit-Specific portions of the Hanford 18 Facility Dangerous Waste Permit Application address the content of the Part B 19 permit application guidance prepared by the Washington State Department of 20 Ecology (Ecology 1987 and 1996) and the U.S. Environmental Protection Agency 21 (40 Code of Federal Regulations 270), with additional information needs 22 defined by the Hazardous and Solid Waste Amendments and revisions of 23 Washington Administrative Code 173-303. For ease of reference, the Washington 24 State Department of Ecology alpha-numeric section identifiers from the permit 25 application guidance documentation (Ecology 1996) follow, in brackets, the 26 chapter headings and subheadings. A checklist indicating where information is 27 contained in the Liquid Effluent Retention Facility and 200 Area Effluent 28 Treatment Facility permit application documentation, in relation to the 29 Washington State Department of Ecology guidance, is located in the Contents 30 Section. 31 32 Documentation contained in the General Information Portion is broader in 33 nature and could be used by multiple treatment, storage, and/or disposal units 34 (e.g., the glossary provided in the General Information Portion). Wherever 35 appropriate, the Liquid Effluent Retention Facility and 200 Area Effluent 36 Treatment Facility permit application documentation makes cross-reference to 37 the General Information Portion, rather than duplicating

  8. Hanford Facility dangerous waste permit application, liquid effluent retention facility and 200 area effluent treatment facility

    Energy Technology Data Exchange (ETDEWEB)

    Coenenberg, J.G.

    1997-08-15

    The Hanford Facility Dangerous Waste Permit Application is considered to 10 be a single application organized into a General Information Portion (document 11 number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the 12 Unit-Specific Portion is limited to Part B permit application documentation 13 submitted for individual, `operating` treatment, storage, and/or disposal 14 units, such as the Liquid Effluent Retention Facility and 200 Area Effluent 15 Treatment Facility (this document, DOE/RL-97-03). 16 17 Both the General Information and Unit-Specific portions of the Hanford 18 Facility Dangerous Waste Permit Application address the content of the Part B 19 permit application guidance prepared by the Washington State Department of 20 Ecology (Ecology 1987 and 1996) and the U.S. Environmental Protection Agency 21 (40 Code of Federal Regulations 270), with additional information needs 22 defined by the Hazardous and Solid Waste Amendments and revisions of 23 Washington Administrative Code 173-303. For ease of reference, the Washington 24 State Department of Ecology alpha-numeric section identifiers from the permit 25 application guidance documentation (Ecology 1996) follow, in brackets, the 26 chapter headings and subheadings. A checklist indicating where information is 27 contained in the Liquid Effluent Retention Facility and 200 Area Effluent 28 Treatment Facility permit application documentation, in relation to the 29 Washington State Department of Ecology guidance, is located in the Contents 30 Section. 31 32 Documentation contained in the General Information Portion is broader in 33 nature and could be used by multiple treatment, storage, and/or disposal units 34 (e.g., the glossary provided in the General Information Portion). Wherever 35 appropriate, the Liquid Effluent Retention Facility and 200 Area Effluent 36 Treatment Facility permit application documentation makes cross-reference to 37 the General Information Portion, rather than duplicating

  9. Status of safety at Areva group facilities. 2007 annual report

    International Nuclear Information System (INIS)

    2007-01-01

    This report describes the status of nuclear safety and radiation protection in the facilities of the AREVA group and gives information on radiation protection in the service operations, as observed through the inspection programs and analyses carried out by the General Inspectorate in 2007. Having been submitted to the group's Supervisory Board, this report is sent to the bodies representing the personnel. Content: 1 - A look back at 2007 by the AREVA General Inspector: Visible progress in 2007, Implementation of the Nuclear Safety Charter, Notable events; 2 - Status of nuclear safety and radiation protection in the nuclear facilities and service operations: Personnel radiation protection, Event tracking, Service operations, Criticality control, Radioactive waste and effluent management; 3 - Performance improvement actions; 4 - Description of the General Inspectorate; 5 - Glossary

  10. Grout Treatment Facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1992-07-01

    The Grout Treatment Facility (GTF) is an existing treatment, storage, and/or disposal (TSD) unit located in the 200 East Area and the adjacent 600 Area of the Hanford Site. The GTF mixes dry cementitious solids with liquid mixed waste (containing both dangerous and radioactive constituents) produced by Hanford Site operations. The GTF consists of the following: The 241-AP-02D and 241-AP-04D waste pump pits and transfer piping; Dry Materials Facility (DMF); Grout Disposal Facility (GDF), consisting of the disposal vault and support and monitoring equipment; and Grout Processing Facility (GPF) and Westinghouse Hanford Company on the draft Hanford Facility Dangerous Waste Permit and may not be read to conflict with those comments. The Grout Treatment Facility Dangerous Waste Permit Application consists of both a Part A and a Part B permit application. An explanation of the Part A revisions associated with this TSD unit, including the current revision, is provided at the beginning of the Part A section. The Part B consists of 15 chapters addressing the organization and content of the Part B checklist prepared by the Washington State Department of Ecology (Ecology 1987). For ease of reference, the checklist section numbers, in brackets, follow chapter headings and subheadings

  11. 224-T Transuranic Waste Storage and Assay Facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1992-01-01

    Westinghouse Hanford Company is a major contractor to the US Department of Energy Richland Field Office and serves as cooperator of the 224-T Transuranic Waste Storage and Assay Facility, the storage unit addressed in this permit application. At the time of submission of this portion of the Hanford Facility. Dangerous Waste Permit Application covering the 224-T Transuranic Waste Storage and Assay Facility, many issues identified in comments to the draft Hanford Facility Dangerous Waste Permit remain unresolved. This permit application reflects the positions taken by the US Department of Energy, Company on the draft Hanford Facility Dangerous Waste Permit and may not be read to conflict with those comments. The 224-T Transuranic Waste Storage and Assay Facility Dangerous Waste Permit Application (Revision 0) consists of both a Part A and Part B permit application. An explanation of the Part A revisions associated with this unit, including the Part A revision currently in effect, is provided at the beginning of the Part A section. The Part B consists of 15 chapters addressing the organization and content of the Part B Checklist prepared by the Washington State Department of Ecology (Ecology 1987). The 224-T Transuranic Waste Storage and Assay Facility Dangerous Waste Permit Application contains information current as of March 1, 1992

  12. WIPP's Hazardous Waste Facility Permit Renewal Application

    International Nuclear Information System (INIS)

    Most, W.A.; Kehrman, R.F.

    2009-01-01

    Hazardous waste permits issued by the New Mexico Environment Department (NMED) have a maximum term of 10-years from the permit's effective date. The permit condition in the Waste Isolation Pilot Plant's (WIPP) Hazardous Waste Facility Permit (HWFP) governing renewal applications, directs the Permittees to submit a permit application 180 days prior to expiration of the Permit. On October 27, 1999, the Secretary of the NMED issued to the United States Department of Energy (DOE), the owner and operator of WIPP, and to Washington TRU Solutions LLC (WTS), the Management and Operating Contractor and the cooperator of WIPP, a HWFP to manage, store, and dispose hazardous waste at WIPP. The DOE and WTS are collectively known as the Permittees. The HWFP is effective for a fixed term not to exceed ten years from the effective date of the Permit. The Permittees may renew the HWFP by submitting a new permit application at least 180 calendar days before the expiration date, of the HWFP. The Permittees are not proposing any substantial changes in the Renewal Application. First, the Permittees are seeking the authority to dispose of Contact-Handled and Remote-Handled TRU mixed waste in Panel 8. Panels 4 through 7 have been approved in the WIPP Hazardous Waste Facility Permit as it currently exists. No other change to the facility or to the manner in which hazardous waste is characterized, managed, stored, or disposed is being requested. Second, the Permittees also seek to include the Mine Ventilation Rate Monitoring Plan, as Attachment Q in the HWFP. This Plan has existed as a separate document since May 2000. The NMED has requested that the Plan be submitted as part of the Renewal Application. The Permittees have been operating to the Mine Ventilation Rate Monitoring Plan since the Plan was submitted. Third, some information submitted in the original WIPP RCRA Part B Application has been updated, such as demographic information. The Permittees will submit this information in the

  13. Storm Water General Permit 1 for Industrial Facilities

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — General permit #1 for storm water discharges associated with industrial facilities in Iowa for the National Pollutant Discharge Elimination System (NPDES) program.

  14. Hydroelectric Generating Facilities General Permit ...

    Science.gov (United States)

    2017-08-28

    The Notice of Availability of the Final NPDES General Permits (HYDROGP) for Discharges at Hydroelectric Generating Facilities in Massachusetts (MAG360000) and New Hampshire (NHG360000) and Tribal Lands in the State of Massachusetts was published in the Federal Register on December 7, 2009 (see 74 Fed. Reg. No. 233, pages 64074 - 64075).

  15. Status of safety at Areva group facilities. 2007 annual report; Areva, etat de surete des installations nucleaires. Rapport annuel 2007

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    This report describes the status of nuclear safety and radiation protection in the facilities of the AREVA group and gives information on radiation protection in the service operations, as observed through the inspection programs and analyses carried out by the General Inspectorate in 2007. Having been submitted to the group's Supervisory Board, this report is sent to the bodies representing the personnel. Content: 1 - A look back at 2007 by the AREVA General Inspector: Visible progress in 2007, Implementation of the Nuclear Safety Charter, Notable events; 2 - Status of nuclear safety and radiation protection in the nuclear facilities and service operations: Personnel radiation protection, Event tracking, Service operations, Criticality control, Radioactive waste and effluent management; 3 - Performance improvement actions; 4 - Description of the General Inspectorate; 5 - Glossary.

  16. Guide to Permitting Hydrogen Motor Fuel Dispensing Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Rivkin, Carl [National Renewable Energy Lab. (NREL), Golden, CO (United States); Buttner, William [National Renewable Energy Lab. (NREL), Golden, CO (United States); Burgess, Robert [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-03-28

    The purpose of this guide is to assist project developers, permitting officials, code enforcement officials, and other parties involved in developing permit applications and approving the implementation of hydrogen motor fuel dispensing facilities. The guide facilitates the identification of the elements to be addressed in the permitting of a project as it progresses through the approval process; the specific requirements associated with those elements; and the applicable (or potentially applicable) codes and standards by which to determine whether the specific requirements have been met. The guide attempts to identify all applicable codes and standards relevant to the permitting requirements.

  17. Hanford facility dangerous waste permit application, general information portion. Revision 3

    International Nuclear Information System (INIS)

    Sonnichsen, J.C.

    1997-01-01

    For purposes of the Hanford facility dangerous waste permit application, the US Department of Energy's contractors are identified as ''co-operators'' and sign in that capacity (refer to Condition I.A.2. of the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit). Any identification of these contractors as an ''operator'' elsewhere in the application is not meant to conflict with the contractors' designation as co-operators but rather is based on the contractors' contractual status with the U.S. Department of Energy, Richland Operations Office. The Dangerous Waste Portion of the initial Hanford Facility Resource Conservation and Recovery Act Permit, which incorporated five treatment, storage, and/or disposal units, was based on information submitted in the Hanford Facility Dangerous Waste Permit Application and in closure plan and closure/postclosure plan documentation. During 1995, the Dangerous Waste Portion was modified twice to incorporate another eight treatment, storage, and/or disposal units; during 1996, the Dangerous Waste Portion was modified once to incorporate another five treatment, storage, and/or disposal units. The permit modification process will be used at least annually to incorporate additional treatment, storage, and/or disposal units as permitting documentation for these units is finalized. The units to be included in annual modifications are specified in a schedule contained in the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit. Treatment, storage, and/or disposal units will remain in interim status until incorporated into the Permit. The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (this document, DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to individual operating treatment, storage, and/or disposal units for which

  18. Hanford facility dangerous waste permit application, general information portion. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    Sonnichsen, J.C.

    1997-08-21

    For purposes of the Hanford facility dangerous waste permit application, the US Department of Energy`s contractors are identified as ``co-operators`` and sign in that capacity (refer to Condition I.A.2. of the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit). Any identification of these contractors as an ``operator`` elsewhere in the application is not meant to conflict with the contractors` designation as co-operators but rather is based on the contractors` contractual status with the U.S. Department of Energy, Richland Operations Office. The Dangerous Waste Portion of the initial Hanford Facility Resource Conservation and Recovery Act Permit, which incorporated five treatment, storage, and/or disposal units, was based on information submitted in the Hanford Facility Dangerous Waste Permit Application and in closure plan and closure/postclosure plan documentation. During 1995, the Dangerous Waste Portion was modified twice to incorporate another eight treatment, storage, and/or disposal units; during 1996, the Dangerous Waste Portion was modified once to incorporate another five treatment, storage, and/or disposal units. The permit modification process will be used at least annually to incorporate additional treatment, storage, and/or disposal units as permitting documentation for these units is finalized. The units to be included in annual modifications are specified in a schedule contained in the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit. Treatment, storage, and/or disposal units will remain in interim status until incorporated into the Permit. The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (this document, DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to individual operating treatment, storage, and/or disposal units for which

  19. Liquid effluent retention facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-06-01

    This appendix to the Liquid Effluent Retention Facility Dangerous Waste Permit Application contains pumps, piping, leak detection systems, geomembranes, leachate collection systems, earthworks and floating cover systems

  20. Hanford facility dangerous waste permit application, general information portion

    International Nuclear Information System (INIS)

    Hays, C.B.

    1998-01-01

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1996) and the U.S. Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needed by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in this report)

  1. Hanford facility dangerous waste permit application, 616 Nonradioactive Dangerous Waste Storage Facility. Revision 2A

    International Nuclear Information System (INIS)

    Bowman, R.C.

    1994-04-01

    This permit application for the 616 Nonradioactive Dangerous Waste Storage Facility consists for 15 chapters. Topics of discussion include the following: facility description and general provisions; waste characteristics; process information; personnel training; reporting and record keeping; and certification

  2. Air emission points for facilities in Iowa with operating permits for Title V of the Federal Clean Air Act_considered MAJOR permits

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — Air emission points for facilities in Iowa with operating permits for Title V of the Federal Clean Air Act, considered "major" permits. Also includes emission points...

  3. Hanford facility dangerous waste permit application, PUREX storage tunnels

    International Nuclear Information System (INIS)

    Price, S.M.

    1997-01-01

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, operating treatment, storage, and/or disposal units, such as the PUREX Storage Tunnels (this document, DOE/RL-90-24). Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1996) and the US Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needs defined by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. For ease of reference, the Washington State Department of Ecology alpha-numeric section identifiers from the permit application guidance documentation (Ecology 1996) follow, in brackets, the chapter headings and subheadings. A checklist indicating where information is contained in the PUREX Storage Tunnels permit application documentation, in relation to the Washington State Department of Ecology guidance, is located in the Contents Section. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Wherever appropriate, the PUREX Storage Tunnels permit application documentation makes cross-reference to the General Information Portion, rather than duplicating text. Information provided in this PUREX Storage Tunnels permit application documentation is current as of April 1997

  4. Permitting mixed waste treatment, storage and disposal facilities: A mixed bag

    International Nuclear Information System (INIS)

    Ranek, N.L.; Coalgate, J.L.

    1995-01-01

    The Federal Facility Compliance Act of 1992 (FFCAct) requires the U.S. Department of Energy (DOE) to make a comprehensive national inventory of its mixed wastes (i.e., wastes that contain both a hazardous component that meets the Resource Conservation and Recovery Act (RCRA) definition of hazardous waste and a radioactive component consisting of source, special nuclear, or byproduct material regulated under the Atomic Energy Act (AEA)), and of its mixed waste treatment technologies and facilities. It also requires each DOE facility that stores or generates mixed waste to develop a treatment plan that includes, in part, a schedule for constructing units to treat those wastes that can be treated using existing technologies. Inherent in constructing treatment units for mixed wastes is, of course, permitting. This paper identifies Federal regulatory program requirements that are likely to apply to new DOE mixed waste treatment units. The paper concentrates on showing how RCRA permitting requirements interrelate with the permitting or licensing requirements of such other laws as the Atomic Energy Act, the Clean Water Act, and the Clean Air Act. Documentation needed to support permit applications under these laws are compared with RCRA permit application documentation. National Environmental Policy Act (NEPA) documentation requirements are also addressed, and throughout the paper, suggestions are made for managing the permitting process

  5. 300 Area Treated Effluent Disposal Facility permit reopener run plan

    International Nuclear Information System (INIS)

    Olander, A.R.

    1995-01-01

    The 300 Area Treated Effluent Disposal Facility (TEDF) is authorized to discharge treated effluent to the Columbia River by National Pollutant Discharge Elimination System permit WA-002591-7. The letter accompanying the final permit noted the following: EPA recognizes that the TEDF is a new waste treatment facility for which full scale operation and effluent data has not been generated. The permit being issued by EPA contains discharge limits that are intended to force DOE's treatment technology to the limit of its capability.'' Because of the excessively tight limits the permit contains a reopener clause which may allow limits to be renegotiated after at least one year of operation. The restrictions for reopening the permit are as follows: (1) The permittee has properly operated and maintained the TEDF for a sufficient period to stabilize treatment plant operations, but has nevertheless been unable to achieve the limitation specified in the permit. (2) Effluent data submitted by the permittee supports the effluent limitation modifications(s). (3) The permittee has submitted a formal request for the effluent limitation modification(s) to the Director. The purpose of this document is to guide plant operations for approximately one year to ensure appropriate data is collected for reopener negotiations

  6. Permitting of Wind Energy Facilities: A Handbook

    Energy Technology Data Exchange (ETDEWEB)

    NWCC Siting Work Group

    2002-08-01

    This handbook has been written for individuals and groups involved in evaluating wind projects: decision-makers and agency staff at all levels of government, wind developers, interested parties and the public. Its purpose is to help stakeholders make permitting wind facility decisions in a manner which assures necessary environmental protection and responds to public needs.

  7. Hanford facility dangerous waste permit application, 242-A evaporator

    International Nuclear Information System (INIS)

    Engelmann, R.H.

    1997-01-01

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, 'operating' treatment, storage, and/or disposal units, such as the 242-A Evaporator (this document, DOE/RL-90-42)

  8. Grout treatment facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1988-01-01

    This section briefly describes the Hanford Site, provides a general description of the site operations and administration, provides an overview of the contents of this Grout Treatment Facility (GTF) Permit Application, and gives a list of acronyms and abbreviations used in the document. The decision was made to use the checklist as a locator reference instead of using the checklist section numbers as paragraph section numbers because several different types of waste management units, some of which are not addressed in the checklists, are part of the GTF. The GTF is a waste management unit within the Hanford Site facility. In May 1988, permit application was filed that identified the GTF as an existing facility. The GTF mixes dry cementitious solids with liquid mixed wastes (containing both dangerous and radioactive constituents) produced by Hanford Site operations. In addition to the design and operating features of the GTF that are intended to meet the requirements of dangerous waste regulations, many additional design and operating features are necessary to comply with radioactive waste management practices. The GTF design features and practices are intended to keep operational exposure to radionuclides and dangerous substances ''as low as reasonably achievable'' (ALARA) and to provide a disposal system that protects the environment for at least 10,000 yr. In some instances, ALARA practices present difficulties when complying with requirements of dangerous waste regulations

  9. Hanford Facility Dangerous Waste Permit Application, 222-S Laboratory Complex

    International Nuclear Information System (INIS)

    WILLIAMS, J.F.

    2000-01-01

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, operating treatment, storage, and/or disposal units, such as the 222-S Laboratory Complex (this document, DOE/RL-91-27). Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1987 and 1996) and the U.S. Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needs defined by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. For ease of reference, the Washington State Department of Ecology alpha-numeric section identifiers from the permit application guidance documentation (Ecology 1996) follow, in brackets, the chapter headings and subheadings. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Wherever appropriate, the 222-S Laboratory Complex permit application documentation makes cross-reference to the General Information Portion, rather than duplicating text. Information provided in this 222-S Laboratory Complex permit application documentation is current as of August 2000

  10. Potable Water Treatment Facility General Permit (PWTF GP) ...

    Science.gov (United States)

    2017-08-28

    The Final PWTF GP establishes permit eligibility conditions, Notice of Intent (NOI) requirements, effluent limitations, standards, prohibitions, and best management practices for facilities that discharge to waters in the Commonwealth of Massachusetts (including both Commonwealth and Indian country lands) and the State of New Hampshire.

  11. Grout treatment facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1988-01-01

    This section briefly describes the Hanford Site, provides a general description of the site operations and administration, provides an overview of the contents of this Grout Treatment Facility (GTF) Permit Application, and gives a list of acronyms and abbreviations used in the document. The decision was made to use the checklist as a locator reference instead of using the checklist section numbers as paragraph section numbers because several different types of waste management units, some of which are not addressed in the checklists, are part of the GTF. The GTF is a waste management unit within the Hanford Site facility. In May 1988, a permit application was filed that identified the GTF as an existing facility. The GTF mixes dry cementitious solids with liquid mixed wastes (containing both dangerous and radioactive constituents) produced by Hanford Site operations. In addition to the design and operating features of the GTF that are intended to meet the requirements of dangerous waste regulations, many additional design and operating features are necessary to comply with radioactive waste management practices. The GTF design features and practices are intended to keep operational exposure to radionuclides and dangerous substances ''as low as reasonably achievable'' (ALARA) and to provide a disposal system that protects the environment for at least 10,000 yr. In some instances, ALARA practices present difficulties when complying with requirements of dangerous waste regulations. This volume contains 2 appendices covering engineering drawings and operating procedures

  12. Grout treatment facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1988-01-01

    This section briefly describes the Hanford Site, provides a general description of the site operations and administration, provides an overview of the contents of this Grout Treatment Facility (GTF) Permit Application, and gives a list of acronyms and abbreviations used in the document. The decision was made to use the checklist as a locator reference instead of using the checklist section numbers as paragraph section numbers because several different types of waste management units, some of which are not addressed in the checklists, are part of the GTF. The GTF is a waste management unit within the Hanford Site facility. In May 1988, a permit application was filed that identified the GTF as an existing facility. The GTF mixes dry cementitious solids with liquid mixed wastes (containing both dangerous and radioactive constitutents) produced by Hanford Site operations. In addition to the design and operating features of the GTF that are intended to meet the requirements of dangerous waste regulations, many additional design and operating features are necessary to comply with radioactive waste management practices. The GTF design features and practices are intended to keep operational exposure to radionuclides and dangerous substances ''as low as reasonably achievable'' (ALARA) and to provide a disposal system that protects the environment for at least 10,000 yr. In some instances, ALARA practices present difficulties when complying with requirements of dangerous waste regulations. This volume contains 2 Appendices covering engineering drawings and operating procedures

  13. Grout Treatment Facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1988-01-01

    This section briefly describes the Hanford Site, provides a general description of the site operations and administration, provides an overview of the contents of this Grout Treatment Facility (GTF) Permit Application, and gives a list of acronyms and abbreviations used in the document. The decision was made to use the checklist as a locator reference instead of using the checklist section numbers as paragraph section numbers because several different types of waste management units, some of which are not addressed in the checklists, are part of the GTF. The GTF is a waste management unit within the Hanford Site facility. In May 1988, a permit application was filed that identified the GTF as an existing facility. The GTF mixes dry cementitious solids with liquid wastes (containing both dangerous and radioactive constituents) produced by Hanford Site operations. In addition to the design and operating features of the GTF that are intended to meet the requirements of dangerous waste regulations, many additional design and operating features are necessary to comply with radioactive waste management practices. The GTF design features and practices are intended to keep operational exposure to radionuclides and dangerous substances ''as low as reasonably achievable'' (ALARA) and to provide a disposal system that protects the environment for at least 10,000 yr. In some instances, ALARA practices present difficulties when complying with requirements of dangerous waste regulations. This volume contains 14 Appendices. Topics include Engineering Drawings, Maps, Roads, Toxicity Testing, and Pilot-Scale Testing

  14. Hanford Facility resource conservation and recovery act permit general inspection plan

    International Nuclear Information System (INIS)

    Beagles, D.B.

    1995-12-01

    The Hanford Facility Resource Conservation and Recovery Act Permit, General Inspection Requirements, includes a requirement that general facility inspections be conducted of the 100, 200 East, 200 West, 300, 400, and 1100 Areas and the banks of the Columbia River. This inspection plan describes the activities that shall be conducted for a general inspection of the Hanford Facility

  15. Hanford facility dangerous waste permit application, low-level burial grounds

    International Nuclear Information System (INIS)

    Engelmann, R.H.

    1997-01-01

    The Hanford Facility Dangerous Plaste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, 'operating' treatment, storage, and/or disposal units, such as the Low-Level Burial Grounds (this document, DOE/RL-88-20)

  16. Hanford facility dangerous waste permit application, low-level burial grounds

    Energy Technology Data Exchange (ETDEWEB)

    Engelmann, R.H.

    1997-08-12

    The Hanford Facility Dangerous Plaste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, `operating` treatment, storage, and/or disposal units, such as the Low-Level Burial Grounds (this document, DOE/RL-88-20).

  17. Hanford Facility dangerous waste permit application, general information

    International Nuclear Information System (INIS)

    1993-05-01

    The current Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (this document, number DOE/RL-91-28) and a treatment, storage, and/or disposal Unit-Specific Portion, which includes documentation for individual TSD units (e.g., document numbers DOE/RL-89-03 and DOE/RL-90-01). Both portions consist of a Part A division and a Part B division. The Part B division consists of 15 chapters that address the content of the Part B checklists prepared by the Washington State Department of Ecology (Ecology 1987) and the US Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information requirements mandated by the Hazardous and Solid Waste Amendments of 1984 and revisions of Washington Administrative Code 173-303. For ease of reference, the Washington State Department of Ecology checklist section numbers, in brackets, follow the chapter headings and subheadings. Documentation contained in the General Information Portion (i.e., this document, number DOE/RL-91-28) is broader in nature and applies to all treatment, storage, and/or disposal units for which final status is sought. Because of its broad nature, the Part A division of the General Information Portion references the Hanford Facility Dangerous Waste Part A Permit Application (document number DOE/RL-88-21), a compilation of all Part A documentation for the Hanford Facility

  18. Hanford Central Waste Complex: Waste Receiving and Processing Facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-10-01

    The Hanford Central Waste Complex is an existing and planned series of treatment, and/or disposal (TSD) unites that will centralize the management of solid waste operations at a single location on the Hanford Facility. The Complex includes two units: the WRAP Facility and the Radioactive Mixed Wastes Storage Facility (RMW Storage Facility). This Part B permit application addresses the WRAP Facility. The Facility will be a treatment and storage unit that will provide the capability to examine, sample, characterize, treat, repackage, store, and certify radioactive and/or mixed waste. Waste treated and stored will include both radioactive and/or mixed waste received from onsite and offsite sources. Certification will be designed to ensure and demonstrate compliance with waste acceptance criteria set forth by onsite disposal units and/or offsite facilities that subsequently are to receive waste from the WRAP Facility. This permit application discusses the following: facility description and general provisions; waste characterization; process information; groundwater monitoring; procedures to prevent hazards; contingency plant; personnel training; exposure information report; waste minimization plan; closure and postclosure requirements; reporting and recordkeeping; other relevant laws; certification

  19. Recycled Water Reuse Permit Renewal Application for the Central Facilities Area Sewage Treatment Plant

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, Mike [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    This renewal application for a Recycled Water Reuse Permit is being submitted in accordance with the Idaho Administrative Procedures Act 58.01.17 “Recycled Water Rules” and the Municipal Wastewater Reuse Permit LA-000141-03 for continuing the operation of the Central Facilities Area Sewage Treatment Plant located at the Idaho National Laboratory. The permit expires March 16, 2015. The permit requires a renewal application to be submitted six months prior to the expiration date of the existing permit. For the Central Facilities Area Sewage Treatment Plant, the renewal application must be submitted by September 16, 2014. The information in this application is consistent with the Idaho Department of Environmental Quality’s Guidance for Reclamation and Reuse of Municipal and Industrial Wastewater and discussions with Idaho Department of Environmental Quality personnel.

  20. Hydroelectric Generating Facilities General Permit (HYDROGP) for Massachusetts & New Hampshire

    Science.gov (United States)

    Documents, links & contacts for the Notice of Availability of the Final NPDES General Permits (HYDROGP) for Discharges at Hydroelectric Generating Facilities in Massachusetts (MAG360000) and New Hampshire (NHG360000) and Tribal Lands in the State of MA.

  1. 616 Nonradioactive Dangerous Waste Storage Facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-10-01

    The 616 Nonradioactive Dangerous Waste Storage Facility Dangerous Waste Permit Application consists of both a Part A and a Part B permit application. An explanation of the Part A revisions associated with this storage unit, including the Part A included with this document, is provided at the beginning of the Part A Section. The Part B consists of 15 chapters addressing the organization and content of the Part B Checklist prepared by the Washington State Department of Ecology (Ecology 1987). For ease of reference, the checklist section numbers, in brackets, follow chapter headings and subheadings. The 616 Nonradioactive Dangerous Waste Storage Facility Dangerous Waste Permit Application (Revision 0) was submitted to the Washington State Department of Ecology and the US Environmental Protection Agency on July 31, 1989. Revision 1, addressing Washington State Department of Ecology review comments made on Revision 0 dated November 21, 1989, and March 23, 1990, was submitted on June 22, 1990. This submittal, Revision 2, addresses Washington State Department of Ecology review comments made on Revision 1, dated June 22, 1990, August 30, 1990, December 18, 1990, and July 8, 1991

  2. NPDES Permit for Soap Creek Associates Wastewater Treatment Facility in Montana

    Science.gov (United States)

    Under National Pollutant Discharge Elimination System permit number MT-0023183, Soap Creek Associates, Inc. is authorized to discharge from its wastewater treatment facility located in West, Bighorn County, Montana, to Soap Creek.

  3. Hanford facility RCRA permit condition II.U.1 report: mapping of underground piping

    Energy Technology Data Exchange (ETDEWEB)

    Hays, C.B.

    1996-09-27

    The purpose of this report is to fulfill Condition Il.U.1. of the Hanford Facility (HF) Resource Conservation and Recovery Act (RCRA) Permit. The HF RCRA Permit, Number WA7890008967, became effective on September 28, 1994 (Ecology 1994). Permit Conditions Il.U. (mapping) and II.V. (marking) of the HF RCRA Permit, Dangerous Waste (OW) Portion, require the mapping and marking of dangerous waste underground pipelines subject to the provisions of the Washington Administrative Code (WAC) Chapter 173-303. Permit Condition Il.U.I. requires the submittal of a report describing the methodology used to generate pipeline maps and to assure their quality. Though not required by the Permit, this report also documents the approach used for the field marking of dangerous waste underground pipelines.

  4. NPDES Permit for Dakota Magic Casino Wastewater Treatment Facility in North Dakota

    Science.gov (United States)

    Under NPDES permit ND-0030813, the Dakota Nation Gaming Enterprise is authorized to discharge from the wastewater treatment facility in Richland County, North Dakota, to a roadside ditch flowing to an unnamed tributary to the Bois de Sioux.

  5. NPDES Permit for Town of Lodge Grass Wastewater Treatment Facility in Montana

    Science.gov (United States)

    Under National Pollutant Discharge Elimination System permit number MT0021890, the Town of Lodge Grass is authorized to discharge from from its wastewater treatment facility in Big Horn County to an unnamed slough to the Little Bighorn River.

  6. Atmospheric Radiation Measurement Climate Research Facility (ACRF) Annual Report 2007

    Energy Technology Data Exchange (ETDEWEB)

    LR Roeder

    2007-12-01

    This annual report describes the purpose and structure of the program, and presents key accomplishments in 2007. Notable achievements include: • Successful review of the ACRF as a user facility by the DOE Biological and Environmental Research Advisory Committee. The subcommittee reinforced the importance of the scientific impacts of this facility, and its value for the international research community. • Leadership of the Cloud Land Surface Interaction Campaign. This multi-agency, interdisciplinary field campaign involved enhanced surface instrumentation at the ACRF Southern Great Plains site and, in concert with the Cumulus Humilis Aerosol Processing Study sponsored by the DOE Atmospheric Science Program, coordination of nine aircraft through the ARM Aerial Vehicles Program. • Successful deployment of the ARM Mobile Facility in Germany, including hosting nearly a dozen guest instruments and drawing almost 5000 visitors to the site. • Key advancements in the representation of radiative transfer in weather forecast models from the European Centre for Medium-Range Weather Forecasts. • Development of several new enhanced data sets, ranging from best estimate surface radiation measurements from multiple sensors at all ACRF sites to the extension of time-height cloud occurrence profiles to Niamey, Niger, Africa. • Publication of three research papers in a single issue (February 2007) of the Bulletin of the American Meteorological Society.

  7. NPDES Permit for Rosebud Casino and Hotel Wastewater Treatment Facility in South Dakota

    Science.gov (United States)

    Under NPDES permit SD-0034584, Rosebud Casino and Hotel, South Dakota, is authorized to discharge from its wastewater treatment facility in Todd County, South Dakota to an unnamed drainageway(s) tributary to Rock Creek.

  8. Integrated disposal Facility Sagebrush Habitat Mitigation Project: FY2007 Compensation Area Monitoring Report

    Energy Technology Data Exchange (ETDEWEB)

    Durham, Robin E.; Sackschewsky, Michael R.

    2007-09-01

    This report summarizes the first year survival of sagebrush seedlings planted as compensatory mitigation for the Integrated Disposal Facility Project. Approximately 42,600 bare root seedlings and 26,000 pluglings were planted at a mitigation site along Army Loop Road in February 2007. Initial baseline monitoring occurred in March 2007, and first summer survival was assessed in September 2007. Overall survival was 19%, with bare root survival being marginally better than pluglings (21% versus 14%). Likely major factors contributing to low survival were late season planting and insufficient soil moisture during seedling establishment.

  9. Hanford Central Waste Complex: Radioactive mixed waste storage facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-10-01

    The Hanford Site is owned by the US Government and operated by the US Department of Energy Field Office, Richland. The Hanford Site manages and produces dangerous waste and mixed waste (containing both radioactive and dangerous components). The dangerous waste is regulated in accordance with the Resource Conversation and Recovery Act of 1976 and the State of Washington Hazardous Waste Management Act of 1976. The radioactive component of mixed waste is interpreted by the US Department of Energy to be regulated under the Atomic Energy Act of 1954; the nonradioactive dangerous component of mixed waste is interpreted to be regulated under the Resource Conservation and Recovery Act of 1976 and Washington Administrative Code 173--303. Westinghouse Hanford Company is a major contractor to the US Department of Energy Field Office, Richland and serves as co-operator of the Hanford Central Waste Complex. The Hanford Central Waste Complex is an existing and planned series of treatment, storage, and/or disposal units that will centralize the management of solid waste operations at a single location on the Hanford facility. The Hanford Central Waste Complex units include the Radioactive Mixed Waste Storage Facility, the unit addressed by this permit application, and the Waste Receiving and Processing Facility. The Waste Receiving and Processing Facility is covered in a separate permit application submittal

  10. Annual Site Environmental Report, 2007(ASER)

    International Nuclear Information System (INIS)

    Sabba, D

    2008-01-01

    Management Program (EMP) was completed and progress reports were routinely provided to SLAC senior management. During 2007, there were no reportable releases to the environment from SLAC operations. In addition, many improvements in waste minimization, recycling, stormwater management, groundwater restoration, and SLAC's chemical management system (CMS) were continued during 2007. SLAC replaced two process tanks at the Plating Shop which previously contained chromium solutions with non-chromium containing solutions, reducing the overall use of hazardous chemicals. In addition, 346 polychlorinated biphenyl (PCB)-contaminated capacitors were replaced with non-PCB capacitors, reducing the potential of a release of oil with PCBs during an event such as a fire or an earthquake. SLAC operates its industrial and sanitary wastewater management program in compliance with established permit conditions. During 2007, SLAC obtained a new facility-wide wastewater discharge permit which replaced four separate permits that were previously issued to SLAC. In 2007, no radiological incidents occurred that increased radiation levels or released radioactivity to the environment. In addition to managing its radioactive wastes safely and responsibly, SLAC worked to reduce the amount of waste generated. SLAC has implemented programs and systems to ensure compliance with all radiological requirements related to the environment. Specifically, the Radiation Protection Radiological Waste Management (RPRWM) Group developed a training course to certify Radioactive Waste Generators, conducted a training pilot, and developed a list of potential radioactive waste generators to train. In 2007, the SLAC Environmental Restoration Program continued work on site characterization and evaluation of remedial alternatives at four sites with volatile organic compounds in groundwater and several areas with polychlorinated biphenyls and low concentrations of lead in soil. SLAC is regulated under a site cleanup

  11. Annual Site Environmental Report, 2007(ASER)

    Energy Technology Data Exchange (ETDEWEB)

    Sabba, D

    2008-10-07

    plan, or Environmental Management Program (EMP) was completed and progress reports were routinely provided to SLAC senior management. During 2007, there were no reportable releases to the environment from SLAC operations. In addition, many improvements in waste minimization, recycling, stormwater management, groundwater restoration, and SLAC's chemical management system (CMS) were continued during 2007. SLAC replaced two process tanks at the Plating Shop which previously contained chromium solutions with non-chromium containing solutions, reducing the overall use of hazardous chemicals. In addition, 346 polychlorinated biphenyl (PCB)-contaminated capacitors were replaced with non-PCB capacitors, reducing the potential of a release of oil with PCBs during an event such as a fire or an earthquake. SLAC operates its industrial and sanitary wastewater management program in compliance with established permit conditions. During 2007, SLAC obtained a new facility-wide wastewater discharge permit which replaced four separate permits that were previously issued to SLAC. In 2007, no radiological incidents occurred that increased radiation levels or released radioactivity to the environment. In addition to managing its radioactive wastes safely and responsibly, SLAC worked to reduce the amount of waste generated. SLAC has implemented programs and systems to ensure compliance with all radiological requirements related to the environment. Specifically, the Radiation Protection Radiological Waste Management (RPRWM) Group developed a training course to certify Radioactive Waste Generators, conducted a training pilot, and developed a list of potential radioactive waste generators to train. In 2007, the SLAC Environmental Restoration Program continued work on site characterization and evaluation of remedial alternatives at four sites with volatile organic compounds in groundwater and several areas with polychlorinated biphenyls and low concentrations of lead in soil. SLAC is

  12. Bioaerosol releases from compost facilities: Evaluating passive and active source terms at a green waste facility for improved risk assessments

    Science.gov (United States)

    Taha, M. P. M.; Drew, G. H.; Longhurst, P. J.; Smith, R.; Pollard, S. J. T.

    The passive and active release of bioaerosols during green waste composting, measured at source is reported for a commercial composting facility in South East (SE) England as part of a research programme focused on improving risk assessments at composting facilities. Aspergillus fumigatus and actinomycetes concentrations of 9.8-36.8×10 6 and 18.9-36.0×10 6 cfu m -3, respectively, measured during the active turning of green waste compost, were typically 3-log higher than previously reported concentrations from static compost windrows. Source depletion curves constructed for A. fumigatus during compost turning and modelled using SCREEN3 suggest that bioaerosol concentrations could reduce to background concentrations of 10 3 cfu m -3 within 100 m of this site. Authentic source term data produced from this study will help to refine the risk assessment methodologies that support improved permitting of compost facilities.

  13. 41 CFR 102-74.55 - Are vending facilities authorized under the Randolph-Sheppard Act operated by permit or contract?

    Science.gov (United States)

    2010-07-01

    ... vending facilities (including vending machines) on Federal property. ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Are vending facilities....55 Are vending facilities authorized under the Randolph-Sheppard Act operated by permit or contract...

  14. Hanford facility dangerous waste permit application, 325 hazardous waste treatment units. Revision 1

    International Nuclear Information System (INIS)

    1997-07-01

    This report contains the Hanford Facility Dangerous Waste Permit Application for the 325 Hazardous Waste Treatment Units (325 HWTUs) which consist of the Shielded Analytical Laboratory, the 325 Building, and the 325 Collection/Loadout Station Tank. The 325 HWTUs receive, store, and treat dangerous waste generated by Hanford Facility programs. Routine dangerous and/or mixed waste treatment that will be conducted in the 325 HWTUs will include pH adjustment, ion exchange, carbon absorption, oxidation, reduction, waste concentration by evaporation, precipitation, filtration, solvent extraction, solids washing, phase separation, catalytic destruction, and solidification/stabilization

  15. Hanford facility dangerous waste permit application, 325 hazardous waste treatment units. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-01

    This report contains the Hanford Facility Dangerous Waste Permit Application for the 325 Hazardous Waste Treatment Units (325 HWTUs) which consist of the Shielded Analytical Laboratory, the 325 Building, and the 325 Collection/Loadout Station Tank. The 325 HWTUs receive, store, and treat dangerous waste generated by Hanford Facility programs. Routine dangerous and/or mixed waste treatment that will be conducted in the 325 HWTUs will include pH adjustment, ion exchange, carbon absorption, oxidation, reduction, waste concentration by evaporation, precipitation, filtration, solvent extraction, solids washing, phase separation, catalytic destruction, and solidification/stabilization.

  16. National Pollution Discharge Elimination System (NPDES) Facility Points, Region 9, 2007, US EPA Region 9

    Data.gov (United States)

    U.S. Environmental Protection Agency — Point geospatial dataset representing locations of NPDES Facilities. NPDES (National Pollution Discharge Elimination System) is an EPA permit program that regulates...

  17. The improvement of the fire protections system for nuclear cycle facilities. Formulation of a fire protection guideline for nuclear fuel cycle facilities

    International Nuclear Information System (INIS)

    2012-04-01

    The private side Fire Protection Guideline was investigated with respect to the fire having taken place at the nuclear reactor site followed by the Chuetsu-Oki earthquake in Niigata Prefecture in 2007. To improve the fire protection system especially applicable to MOX fuel fabrication facilities, JNES (Japan Nuclear Energy Safety Organization) investigated private guidelines adopted in Japanese Light Water cooled Reactors, the standardized guidelines used in Nuclear Facilities in other countries including USA, and the standards in the chemical plants. The content of the guideline concerns the prevention of the fire breakout, the prevention of fire extension, the reduction of the fire effects, as well as the facility-characteristic protection countermeasures and the fire effect evaluations. (S. Ohno)

  18. Fall 2010 Semiannual (III.H. and I.U.) Report for the HWMA/RCRA Post Closure Permit for the INTEC Waste Calcining Facility and the CPP 601/627/640 Facility at the INL Site

    Energy Technology Data Exchange (ETDEWEB)

    Boehmer, Ann

    2010-11-01

    The Waste Calcining Facility is located at the Idaho Nuclear Technology and Engineering Center. In 1999, the Waste Calcining Facility was closed under an approved Hazardous Waste Management Act/Resource Conservation and Recovery Act (HWMA/RCRA) Closure Plan. Vessels and spaces were grouted and then covered with a concrete cap. The Idaho Department of Environmental Quality issued a final HWMA/RCRA post-closure permit on September 15, 2003, with an effective date of October 16, 2003. This permit sets forth procedural requirements for groundwater characterization and monitoring, maintenance, and inspections of the Waste Calcining Facility to ensure continued protection of human health and the environment. The post closure permit also includes semiannual reporting requirements under Permit Conditions III.H. and I.U. These reporting requirements have been combined into this single semiannual report, as agreed between the Idaho Cleanup Project and Idaho Department of Environmental Quality. The Permit Condition III.H. portion of this report includes a description and the results of field methods associated with groundwater monitoring of the Waste Calcining Facility. Analytical results from groundwater sampling, results of inspections and maintenance of monitoring wells in the Waste Calcining Facility groundwater monitoring network, and results of inspections of the concrete cap are summarized. The Permit Condition I.U. portion of this report includes noncompliances not otherwise required to be reported under Permit Condition I.R. (advance notice of planned changes to facility activity which may result in a noncompliance) or Permit Condition I.T. (reporting of noncompliances which may endanger human health or the environment). This report also provides groundwater sampling results for wells that were installed and monitored as part of the Phase 1 post-closure period of the landfill closure components in accordance with HWMA/RCRA Landfill Closure Plan for the CPP-601 Deep

  19. Annual Hanford Site environmental permitting status report

    International Nuclear Information System (INIS)

    Sonnichsen, J.C.

    1998-01-01

    The information contained and/or referenced in this Annual Hanford Site Environmental Permitting Status Report (Status Report) addresses the State Environmental Policy Act (SEPA) of 1971 and Condition II.W. of the Resource Conservation and Recovery Act (RCRA) of 1976 Permit, Dangerous Waste Portion (DW Portion). Condition II.W. of the RCRA Permit specifies the Permittees are responsible for all other applicable federal, state, and local permits for the development and operation of the Hanford Facility. Condition II.W. of the RCRA Permit specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of permit condition, 'best efforts' means submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies. This Status Report includes information on all existing and anticipated environmental permitting. Environmental permitting required by RCRA, the Hazardous and Solid Waste Amendments (HSWA) of 1984, and non-RCRA permitting (solid waste handling, Clean Air Act Amendments of 1990, Clean Water Act Amendments of 1987, Washington State waste discharge, and onsite sewage system) is addressed. Information on RCRA and non-RCRA is current as of July 31, 1998. For the purposes of RCRA and the State of Washington Hazardous Waste Management Act of 1976 [as administered through the Dangerous Waste Regulations, Washington Active Code (WAC) 173-303], the Hanford Facility is considered a single facility. As such, the Hanford Facility has been issued one US Environmental Protection Agency (EPA)/State Identification Number (WA7890008967). This EPA/State identification number encompasses over 60 treatment, storage, and/or disposal (TSD) units. The Washington State Department of Ecology (Ecology) has been delegated authority by the EPA to administer the RCRA, including mixed waste authority. The RCRA permitting approach for

  20. 76 FR 61735 - Incidental Take Permit; Auwahi Wind Energy Generation Facility, Maui, HI; Draft Habitat...

    Science.gov (United States)

    2011-10-05

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R1-ES-2011-N161; 10120-1112-0000-F2] Incidental Take Permit; Auwahi Wind Energy Generation Facility, Maui, HI; Draft Habitat Conservation Plan and..., HI 96850. You may also send comments by facsimile to (808) 792-9580. FOR FURTHER INFORMATION CONTACT...

  1. Nuclear Station Facilities Improvement Planning

    International Nuclear Information System (INIS)

    Hooks, R. W.; Lunardini, A. L.; Zaben, O.

    1991-01-01

    An effective facilities improvement program will include a plan for the temporary relocation of personnel during the construction of an adjoining service building addition. Since the smooth continuation of plant operation is of paramount importance, the phasing plan is established to minimize the disruptions in day-to-day station operation and administration. This plan should consider the final occupancy arrangements and the transition to the new structure; for example, computer hookup and phase-in should be considered. The nuclear industry is placing more emphasis on safety and reliability of nuclear power plants. In order to do this, more emphasis is placed on operations and maintenance. This results in increased size of managerial, technical and maintenance staffs. This in turn requires improved office and service facilities. The facilities that require improvement may include training areas, rad waste processing and storage facilities, and maintenance facilities. This paper discusses an approach for developing an effective program to plan and implement these projects. These improvement projects can range in magnitude from modifying a simple system to building a new structure to allocating space for a future project. This paper addresses the planning required for the new structures with emphasis on site location, space allocation, and internal layout. Since facility planning has recently been completed by Sargent and Leyden at six U. S. nuclear stations, specific examples from some of those plants are presented. Site planning and the establishment of long-range goals are of the utmost importance when undertaking a facilities improvement program for a nuclear station. A plan that considers the total site usage will enhance the value of both the new and existing facilities. Proper planning at the beginning of the program can minimize costs and maximize the benefits of the program

  2. State waste discharge permit application: 200 Area Treated Effluent Disposal Facility (Project W-049H)

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-01

    As part of the original Hanford Federal Facility Agreement and Concent Order negotiations, US DOE, US EPA and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground to the Hanford Site are subject to permitting in the State Waste Discharge Permit Program (SWDP). This document constitutes the SWDP Application for the 200 Area TEDF stream which includes the following streams discharged into the area: Plutonium Finishing Plant waste water; 222-S laboratory Complex waste water; T Plant waste water; 284-W Power Plant waste water; PUREX chemical Sewer; B Plant chemical sewer, process condensate, steam condensate; 242-A-81 Water Services waste water.

  3. State waste discharge permit application: 200 Area Treated Effluent Disposal Facility (Project W-049H)

    International Nuclear Information System (INIS)

    1994-08-01

    As part of the original Hanford Federal Facility Agreement and Concent Order negotiations, US DOE, US EPA and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground to the Hanford Site are subject to permitting in the State Waste Discharge Permit Program (SWDP). This document constitutes the SWDP Application for the 200 Area TEDF stream which includes the following streams discharged into the area: Plutonium Finishing Plant waste water; 222-S laboratory Complex waste water; T Plant waste water; 284-W Power Plant waste water; PUREX chemical Sewer; B Plant chemical sewer, process condensate, steam condensate; 242-A-81 Water Services waste water

  4. Annual Hanford Site Environmental Permitting Status Report

    International Nuclear Information System (INIS)

    HOMAN, N.A.

    2000-01-01

    The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. This status report also addresses Permit Condition I.E.22, as interpreted in Section 12.1.25 of the Hanford Facility Dangerous Waste Permit Application, General Information Portion (DOE/RL-91-28, Rev. 4), that states this report will be prepared annually and a copy of this report will be placed in the Facility Operating Record, General Information file by October 1 of each year

  5. Dengue surveillance in Veterans Affairs healthcare facilities, 2007-2010.

    Directory of Open Access Journals (Sweden)

    Patricia L Schirmer

    Full Text Available BACKGROUND: Although dengue is endemic in Puerto Rico (PR, 2007 and 2010 were recognized as epidemic years. In the continental United States (US, outside of the Texas-Mexico border, there had not been a dengue outbreak since 1946 until dengue re-emerged in Key West, Florida (FL, in 2009-2010. The objective of this study was to use electronic and manual surveillance systems to identify dengue cases in Veterans Affairs (VA healthcare facilities and then to clinically compare dengue cases in Veterans presenting for care in PR and in FL. METHODOLOGY: Outpatient encounters from 1/2007-12/2010 and inpatient admissions (only available from 10/2009-12/2010 with dengue diagnostic codes at all VA facilities were identified using VA's Electronic Surveillance System for Early Notification of Community-based Epidemics (ESSENCE. Additional case sources included VA data from Centers for Disease Control and Prevention BioSense and VA infection preventionists. Case reviews were performed. Categorical data was compared using Mantel-Haenszel or Fisher Exact tests and continuous variables using t-tests. Dengue case residence was mapped. FINDINGS: Two hundred eighty-eight and 21 PR and FL dengue cases respectively were identified. Of 21 FL cases, 12 were exposed in Key West and 9 were imported. During epidemic years, FL cases had significantly increased dengue testing and intensive care admissions, but lower hospitalization rates and headache or eye pain symptoms compared to PR cases. There were no significant differences in clinical symptoms, laboratory abnormalities or outcomes between epidemic and non-epidemic year cases in FL and PR. Confirmed/probable cases were significantly more likely to be hospitalized and have thrombocytopenia or leukopenia compared to suspected cases. CONCLUSIONS: Dengue re-introduction in the continental US warrants increased dengue surveillance and education in VA. Throughout VA, under-testing of suspected cases highlights the need to

  6. Quality of Diabetes Care in Germany Improved from 2000 to 2007 to 2014, but Improvements Diminished since 2007. Evidence from the Population-Based KORA Studies.

    Directory of Open Access Journals (Sweden)

    Michael Laxy

    Full Text Available Little is known about the development of the quality of diabetes care in Germany. The aim of this study is to analyze time trends in patient self-management, physician-delivered care, medication, risk factor control, complications and quality of life from 2000 to 2014.Analyses are based on data from individuals with type 2 diabetes of the population-based KORA S4 (1999-2001, n = 150, F4 (2006-2008, n = 203, FF4 (2013/14, n = 212 cohort study. Information on patient self-management, physician-delivered care, medication, risk factor control and quality of life were assessed in standardized questionnaires and examinations. The 10-year coronary heart disease (CHD risk was calculated using the UKPDS risk engine. Time trends were analyzed using multivariable linear and logistic regression models adjusted for age, sex, education, diabetes duration, and history of cardiovascular disease.From 2000 to 2014 the proportion of participants with type 2 diabetes receiving oral antidiabetic/cardio-protective medication and of those reaching treatment goals for glycemic control (HbA1c<7%, 60% to 71%, p = 0.09, blood pressure (<140/80 mmHg, 25% to 69%, p<0.001 and LDL cholesterol (<2.6 mmol/l, 13% to 27%, p<0.001 increased significantly. However, improvements were generally smaller from 2007 to 2014 than from 2000 to 2007. Modeled 10-year CHD risk decreased from 30% in 2000 to 24% in 2007 to 19% in 2014 (p<0.01. From 2007 to 2014, the prevalence of microvascular complications decreased and quality of life increased, but no improvements were observed for the majority of indicators of self-management.Despite improvements, medication and risk factor control has remained suboptimal. The flattening of improvements and deteriorations in quality of (self- care since 2007 indicate that more effort is needed to improve quality of care and patient self-management. Due to selection or lead time bias an overestimation of quality of care improvements cannot be ruled out.

  7. Improvement of irradiation facilities performance in JMTR

    International Nuclear Information System (INIS)

    Kanno, Masaru; Sakurai, Susumu; Honma, Kenzo; Sagawa, Hisashi; Nakazaki, Chousaburo

    1999-01-01

    Various kinds of irradiation facilities are installed in the JMTR for the purpose of irradiation tests on fuels and materials and of producing radioisotopes. The irradiation facilities have been improved so far at every opportunity of new irradiation requirements and of renewing them which reached the design lifetime. Of these irradiation facilities, improvements of the power ramping test facility (BOCA/OSF-1 facility) and the hydraulic rabbit No.2 (HR-2 facility) are described here. (author)

  8. First Commercial US Mixed Waste Vitrification Facility: Permits, Readiness Reviews, and Delisting of Final Wasteform

    International Nuclear Information System (INIS)

    Pickett, J.B.; Norford, S.W.; Diener, G.A.

    1998-01-01

    Westinghouse Savannah River Co. (WSRC) contracted GTS Duratek (Duratek) to construct and operate the first commercial vitrification facility to treat an F-006 mixed (radioactive/hazardous) waste in the United States. The permits were prepared and submitted to the South Carolina state regulators by WSRC - based on a detailed design by Duratek. Readiness Assessments were conducted by WSRC and Duratek at each major phase of the operation (sludge transfer, construction, cold and radioactive operations, and a major restart) and approved by the Savannah River Department of Energy prior to proceeding. WSRC prepared the first 'Upfront Delisting' petition for a vitrified mixed waste. Lessons learned with respect to the permit strategy, operational assessments, and delisting from this 'privatization' project will be discussed

  9. Use of facility assessment data to improve reproductive health service delivery in the Democratic Republic of the Congo

    Directory of Open Access Journals (Sweden)

    Aveledi Blandine

    2009-12-01

    Full Text Available Abstract Background Prolonged exposure to war has severely impacted the provision of health services in the Democratic Republic of the Congo (DRC. Health infrastructure has been destroyed, health workers have fled and government support to health care services has been made difficult by ongoing conflict. Poor reproductive health (RH indicators illustrate the effect that the prolonged crisis in DRC has had on the on the reproductive health (RH of Congolese women. In 2007, with support from the RAISE Initiative, the International Rescue Committee (IRC and CARE conducted baseline assessments of public hospitals to evaluate their capacities to meet the RH needs of the local populations and to determine availability, utilization and quality of RH services including emergency obstetric care (EmOC and family planning (FP. Methods Data were collected from facility assessments at nine general referral hospitals in five provinces in the DRC during March, April and November 2007. Interviews, observation and clinical record review were used to assess the general infrastructure, EmOC and FP services provided, and the infection prevention environment in each of the facilities. Results None of the nine hospitals met the criteria for classification as an EmOC facility (either basic or comprehensive. Most facilities lacked any FP services. Shortage of trained staff, essential supplies and medicines and poor infection prevention practices were consistently documented. All facilities had poor systems for routine monitoring of RH services, especially with regard to EmOC. Conclusions Women's lives can be saved and their well-being improved with functioning RH services. As the DRC stabilizes, IRC and CARE in partnership with the local Ministry of Health and other service provision partners are improving RH services by: 1 providing necessary equipment and renovations to health facilities; 2 improving supply management systems; 3 providing comprehensive competency

  10. Calendar year 2007 annual site environmental report for Tonopah Test Range, Nevada and Kauai Test Facility, Hawaii,

    Energy Technology Data Exchange (ETDEWEB)

    Agogino, Karen [Department of Energy, Albuquerque, NM (United States). National Nuclear Security Administration (NNSA); Sanchez, Rebecca [Sandia Corp., Albuquerque, NM (United States)

    2008-09-30

    Tonopah Test Range (TTR) in Nevada and Kauai Test Facility (KTF) in Hawaii are government-owned, contractor-operated facilities operated by Sandia Corporation (Sandia), a wholly owned subsidiary of Lockheed Martin Corporation. The U.S. Department of Energy (DOE)/National Nuclear Security Administration (NNSA), through the Sandia Site Offi ce (SSO), in Albuquerque, NM, administers the contract and oversees contractor operations at TTR and KTF. Sandia manages and conducts operations at TTR in support of the DOE/NNSA’s Weapons Ordnance Program and has operated the site since 1957. Washington Group International subcontracts to Sandia in administering most of the environmental programs at TTR. Sandia operates KTF as a rocket preparation launching and tracking facility. This Annual Site Environmental Report (ASER) summarizes data and the compliance status of the environmental protection and monitoring program at TTR and KTF through Calendar Year (CY) 2007. The compliance status of environmental regulations applicable at these sites include state and federal regulations governing air emissions, wastewater effluent, waste management, terrestrial surveillance, and Environmental Restoration (ER) cleanup activities. Sandia is responsible only for those environmental program activities related to its operations. The DOE/NNSA/Nevada Site Offi ce (NSO) retains responsibility for the cleanup and management of ER TTR sites. Currently, there are no ER Sites at KTF. Environmental monitoring and surveillance programs are required by DOE Order 450.1, Environmental Protection Program (DOE 2007a) and DOE Manual 231.1-1A, Environment, Safety, and Health Reporting Manual (DOE 2007).

  11. Recycled water reuse permit renewal application for the materials and fuels complex industrial waste ditch and industrial waste pond

    Energy Technology Data Exchange (ETDEWEB)

    Name, No

    2014-10-01

    This renewal application for the Industrial Wastewater Reuse Permit (IWRP) WRU-I-0160-01 at Idaho National Laboratory (INL), Materials and Fuels Complex (MFC) Industrial Waste Ditch (IWD) and Industrial Waste Pond (IWP) is being submitted to the State of Idaho, Department of Environmental Quality (DEQ). This application has been prepared in compliance with the requirements in IDAPA 58.01.17, Recycled Water Rules. Information in this application is consistent with the IDAPA 58.01.17 rules, pre-application meeting, and the Guidance for Reclamation and Reuse of Municipal and Industrial Wastewater (September 2007). This application is being submitted using much of the same information contained in the initial permit application, submitted in 2007, and modification, in 2012. There have been no significant changes to the information and operations covered in the existing IWRP. Summary of the monitoring results and operation activity that has occurred since the issuance of the WRP has been included. MFC has operated the IWP and IWD as regulated wastewater land treatment facilities in compliance with the IDAPA 58.01.17 regulations and the IWRP. Industrial wastewater, consisting primarily of continuous discharges of nonhazardous, nonradioactive, routinely discharged noncontact cooling water and steam condensate, periodic discharges of industrial wastewater from the MFC facility process holdup tanks, and precipitation runoff, are discharged to the IWP and IWD system from various MFC facilities. Wastewater goes to the IWP and IWD with a permitted annual flow of up to 17 million gallons/year. All requirements of the IWRP are being met. The Operations and Maintenance Manual for the Industrial Wastewater System will be updated to include any new requirements.

  12. The Remote Handled Immobilization Low Activity Waste Disposal Facility Environmental Permits & Approval Plan

    Energy Technology Data Exchange (ETDEWEB)

    DEFFENBAUGH, M.L.

    2000-08-01

    The purpose of this document is to revise Document HNF-SD-ENV-EE-003, ''Permitting Plan for the Immobilized Low-Activity Waste Project, which was submitted on September 4, 1997. That plan accounted for the interim storage and disposal of Immobilized-Low Activity Waste at the existing Grout Treatment Facility Vaults (Project W-465) and within a newly constructed facility (Project W-520). Project W-520 was to have contained a combination of concrete vaults and trenches. This document supersedes that plan because of two subsequent items: (1) A disposal authorization that was received on October 25, 1999, in a U. S. Department of Energy-Headquarters, memorandum, ''Disposal Authorization Statement for the Department of Energy Hanford site Low-Level Waste Disposal facilities'' and (2) ''Breakthrough Initiative Immobilized Low-Activity Waste (ILAW) Disposal Alternative,'' August 1999, from Lucas Incorporated, Richland, Washington. The direction within the U. S. Department of Energy-Headquarters memorandum was given as follows: ''The DOE Radioactive Waste Management Order requires that a Disposal authorization statement be obtained prior to construction of new low-level waste disposal facility. Field elements with the existing low-level waste disposal facilities shall obtain a disposal authorization statement in accordance with the schedule in the complex-wide Low-Level Waste Management Program Plan. The disposal authorization statement shall be issued based on a review of the facility's performance assessment and composite analysis or appropriate CERCLA documentation. The disposal authorization shall specify the limits and conditions on construction, design, operations, and closure of the low-level waste facility based on these reviews. A disposal authorization statement is a part of the required radioactive waste management basis for a disposal facility. Failure to obtain a disposal authorization statement

  13. EPA Region 2 Discharge Pipes for Facilites with NPDES Permits from the Permit Compliance GIS Layer

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Permit and Compliance System (PCS) contains data on the National Pollution Discharge Elimination Systems (NPDES) permit-holding facilities. This includes...

  14. The Remote Handled Immobilization Low-Activity Waste Disposal Facility Environmental Permits and Approval Plan

    International Nuclear Information System (INIS)

    DEFFENBAUGH, M.L.

    2000-01-01

    The purpose of this document is to revise Document HNF-SD-ENV-EE-003, ''Permitting Plan for the Immobilized Low-Activity Waste Project, which was submitted on September 4, 1997. That plan accounted for the interim storage and disposal of Immobilized-Low Activity Waste at the existing Grout Treatment Facility Vaults (Project W-465) and within a newly constructed facility (Project W-520). Project W-520 was to have contained a combination of concrete vaults and trenches. This document supersedes that plan because of two subsequent items: (1) A disposal authorization that was received on October 25, 1999, in a U. S. Department of Energy-Headquarters, memorandum, ''Disposal Authorization Statement for the Department of Energy Hanford site Low-Level Waste Disposal facilities'' and (2) ''Breakthrough Initiative Immobilized Low-Activity Waste (ILAW) Disposal Alternative,'' August 1999, from Lucas Incorporated, Richland, Washington. The direction within the U. S. Department of Energy-Headquarters memorandum was given as follows: ''The DOE Radioactive Waste Management Order requires that a Disposal authorization statement be obtained prior to construction of new low-level waste disposal facility. Field elements with the existing low-level waste disposal facilities shall obtain a disposal authorization statement in accordance with the schedule in the complex-wide Low-Level Waste Management Program Plan. The disposal authorization statement shall be issued based on a review of the facility's performance assessment and composite analysis or appropriate CERCLA documentation. The disposal authorization shall specify the limits and conditions on construction, design, operations, and closure of the low-level waste facility based on these reviews. A disposal authorization statement is a part of the required radioactive waste management basis for a disposal facility. Failure to obtain a disposal authorization statement or record of decision shall result in shutdown of an operational

  15. RCRA Permit for a Hazardous Waste Management Facility Permit Number NEV HW0101 Annual Summary/Waste Minimization Report Calendar Year 2011

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2012-02-16

    This report summarizes the U.S. Environmental Protection Agency (EPA) identification number of each generator from which the Permittee received a waste stream; a description and quantity of each waste stream in tons and cubic feet received at the facility; the method of treatment, storage, and/or disposal for each waste stream; a description of the waste minimization efforts undertaken; a description of the changes in volume and toxicity of waste actually received; any unusual occurrences; and the results of tank integrity assessments. This Annual Summary/Waste Minimization Report is prepared in accordance with Section 2.13.3 of Permit Number NEV HW0101.

  16. Hanford facility dangerous waste Part A, Form 3 and Part B permit application documentation, Central Waste Complex (WA7890008967)(TSD: TS-2-4)

    Energy Technology Data Exchange (ETDEWEB)

    Saueressig, D.G.

    1998-05-20

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, operating, treatment, storage, and/or disposal units, such as the Central Waste Complex (this document, DOE/RL-91-17). Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1996) and the U.S. Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needed by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. For ease of reference, the Washington State Department of Ecology alpha-numeric section identifiers from the permit application guidance documentation (Ecology 1996) follow, in brackets, the chapter headings and subheadings. A checklist indicating where information is contained in the Central Waste Complex permit application documentation, in relation to the Washington State Department of Ecology guidance, is located in the Contents section. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Wherever appropriate, the Central Waste Complex permit application documentation makes cross-reference to the General Information Portion, rather than duplicating text. Information provided in this Central Waste Complex permit application documentation is current as of May 1998.

  17. Resource conversation and recovery act draft hazardous waste facility permit: Waste Isolation Pilot Plant (WIPP)

    International Nuclear Information System (INIS)

    1993-08-01

    Volume II contains attachments for Module II and Module III. Attachments for Module II are: part A permit application; examples of acceptable documentation; Waste Isolation Pilot Plant generator/storage site waste screening and acceptance audit program; inspection schedule and monitoring schedule; inspection log forms; personnel training course outlines; hazardous waste job position training requirements; contingency plan; closure plan; and procedures for establishing background for the underground units. One attachment, facility process information, is included for Module III. Remaining attachments for this module are in Volume III

  18. Radiological protection report 2007; Strahlenschutzbericht 2007

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-07-01

    This annual report issued by the Swiss Federal Nuclear Inspectorate (HSK) reports on the work carried out by the Inspectorate in 2007. It provides comprehensive data on radiation protection activities in Switzerland during 2007. This is the fourth annual summary report on the radiological protection issues regulated by the Inspectorate. It provides comprehensive data on doses for the staff and for individual jobs. It also includes year-to-year comparisons and comments on the continuing decline in collective and average doses for persons exposed to radiation in the course of their work. Radiation doses are commented on. Radiation in the four Swiss nuclear power stations and in four further nuclear installations in various Swiss research facilities is commented on. The Swiss radiation measurement network is commented on and the results obtained are discussed. The Inspectorate concludes that radiological protection in Swiss nuclear facilities is carried out consistently and in compliance with existing legislation.

  19. The triple threat of pregnancy, HIV infection and malaria: reported causes of maternal mortality in two nationwide health facility assessments in Mozambique, 2007 and 2012.

    Science.gov (United States)

    Bailey, Patricia E; Keyes, Emily; Moran, Allisyn C; Singh, Kavita; Chavane, Leonardo; Chilundo, Baltazar

    2015-11-09

    The paper's primary purpose is to determine changes in magnitude and causes of institutional maternal mortality in Mozambique. We also describe shifts in the location of institutional deaths and changes in availability of prevention and treatment measures for malaria and HIV infection. Two national cross-sectional assessments of health facilities with childbirth services were conducted in 2007 and 2012. Each collected retrospective data on deliveries and maternal deaths and their causes. In 2007, 2,199 cases of maternal deaths were documented over a 12 month period; in 2012, 459 cases were identified over a three month period. In 2007, data collection also included reviews of maternal deaths when records were available (n = 712). Institutional maternal mortality declined from 541 to 284/100,000 births from 2007 to 2012. The rate of decline among women dying of direct causes was 66% compared to 26% among women dying of indirect causes. Cause-specific mortality ratios fell for all direct causes. Patterns among indirect causes were less conclusive given differences in cause-of-death recording. In absolute numbers, the combination of antepartum and postpartum hemorrhage was the leading direct cause of death each year and HIV and malaria the main non-obstetric causes. Based on maternal death reviews, evidence of HIV infection, malaria or anemia was found in more than 40% of maternal deaths due to abortion, ectopic pregnancy and sepsis. Almost half (49%) of all institutional maternal deaths took place in the largest hospitals in 2007 while in 2012, only 24% occurred in these hospitals. The availability of antiretrovirals and antimalarials increased in all types of facilities, but increases were most dramatic in health centers. The rate at which women died of direct causes in Mozambique's health facilities appears to have declined significantly. Despite a clear improvement in access to antiretrovirals and antimalarials, especially at lower levels of health care

  20. Grout treatment facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1992-07-01

    The Grout Treatment Facility (GTF) will provide permanent disposal for approximately 43 Mgal of low-level radioactive liquid waste currently being stored in underground tanks on the Hanford Site. The first step in permanent disposal is accomplished by solidifying the liquid waste with cementitious dry materials. The resulting grout is cast within underground vaults. This report on the GTF contains information on the following: Geologic data, hydrologic data, groundwater monitoring program, information, detection monitoring program, groundwater characterization drawings, building emergency plan--grout treatment facility, response action plan for grout treatment facility, Hanford Facility contingency plan, training course descriptions, overview of the Hanford Facility Grout Performance, assessment, bland use and zoning map, waste minimization plan, cover design engineering report, and clay liners (ADMIXTURES) in semiarid environments

  1. Double-shell tank system dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-06-01

    This Double-Shell Tank System Dangerous Waste Permit Application should be read in conjunction with the 242-A Evaporator Dangerous Waste Permit Application and the Liquid Effluent Retention Facility Dangerous Waste Permit Application, also submitted on June 28, 1991. Information contained in the Double-Shell Tank System permit application is referenced in the other two permit applications. The Double-Shell Tank System stores and treats mixed waste received from a variety of sources on the Hanford Site. The 242-A Evaporator treats liquid mixed waste received from the double-shell tanks. The 242-A Evaporator returns a mixed-waste slurry to the double-shell tanks and generates the dilute mixed-waste stream stored in the Liquid Effluent Retention Facility. This report contains information on the following topics: Facility Description and General Provisions; Waste Characteristics; Process Information; Groundwater Monitoring; Procedures to Prevent Hazards; Contingency Plan; Personnel Training; Exposure Information Report; Waste Minimization Plan; Closure and Postclosure Requirements; Reporting and Recordkeeping; other Relevant Laws; and Certification. 150 refs., 141 figs., 118 tabs

  2. Permitting issues in Virginia

    International Nuclear Information System (INIS)

    Kennel, R.P.

    1992-01-01

    As background, LG and E Development Corporation (formerly Hadson) has successfully put 16 Qualifying Facilities in the ground over the past 9 years in California, Maine, Virginia, and North Carolina. Each of these qualifying facilities has had some environmental innovative first, so there is no apology for the authors' environmental credentials. In Virginia, there are four identical 60 MW stoker coal cogeneration projects in Southampton County, Altavista, Hopewell, and -lastly-Buena Vista. The Buena Vista cogeneration project becomes the exception that proves the permitting rules. It has been in the permitting process for over 4 years; and despite being the cleanest coal project ever considered east of the Mississippi (design at 0.1 lbs/MMBtu for both So 2 and NO x ), it has suffered serous consequences from permitting delays and BACT ratcheting. As a simple comparison of importance, the Virginia Power Mt. Storm coal power facility emits approximately 150,000 tons of So 2 per year, while the Buena Vista project will actually emit approximately 150 tons of SO 2 per year (not including 1,500' tons of purchased SO 2 offsets). Both are similar distances from the Shenandoah National Park which has been the primary environmental point of concern in Virginia

  3. FRS (Facility Registration System) Sites, Geographic NAD83, EPA (2007) [facility_registration_system_sites_LA_EPA_2007

    Data.gov (United States)

    Louisiana Geographic Information Center — This dataset contains locations of Facility Registry System (FRS) sites which were pulled from a centrally managed database that identifies facilities, sites or...

  4. 1993 RCRA Part B permit renewal application, Savannah River Site: Volume 10, Consolidated Incineration Facility, Section C, Revision 1

    International Nuclear Information System (INIS)

    Molen, G.

    1993-08-01

    This section describes the chemical and physical nature of the RCRA regulated hazardous wastes to be handled, stored, and incinerated at the Consolidated Incineration Facility (CIF) at the Savannah River Site. It is in accordance with requirements of South Carolina Hazardous Waste Management Regulations R.61-79.264.13(a) and(b), and 270.14(b)(2). This application is for permit to store and teat these hazardous wastes as required for the operation of CIF. The permit is to cover the storage of hazardous waste in containers and of waste in six hazardous waste storage tanks. Treatment processes include incineration, solidification of ash, and neutralization of scrubber blowdown

  5. Annual Report 2007. Nuclear Regulatory Authority; Informe Anual 2007. Autoridad Regulatoria Nuclear

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-07-01

    The present Annual Report of Activities of the Nuclear Regulatory Authority (ARN), prepared regularly from the creation as independent institution, describes across tree parts and seven annexes the activities developed by the organism during 2007. The main topic are: the organization and the activity of the ARN; the regulatory standards; the licensing and inspection of nuclear power plants and critical facilities; the emergency systems; the occupational surveillance; the environmental monitoring; improved organizational. Also, this publication have annexes with the following content: regulatory documents; inspections to medical, industrial and training installations; regulatory guides; measurement and evaluation of the drinking water of Ezeiza.

  6. Ergonomics and simulation-based approach in improving facility layout

    Science.gov (United States)

    Abad, Jocelyn D.

    2018-02-01

    The use of the simulation-based technique in facility layout has been a choice in the industry due to its convenience and efficient generation of results. Nevertheless, the solutions generated are not capable of addressing delays due to worker's health and safety which significantly impact overall operational efficiency. It is, therefore, critical to incorporate ergonomics in facility design. In this study, workstation analysis was incorporated into Promodel simulation to improve the facility layout of a garment manufacturing. To test the effectiveness of the method, existing and improved facility designs were measured using comprehensive risk level, efficiency, and productivity. Results indicated that the improved facility layout generated a decrease in comprehensive risk level and rapid upper limb assessment score; an increase of 78% in efficiency and 194% increase in productivity compared to existing design and thus proved that the approach is effective in attaining overall facility design improvement.

  7. 40 CFR 71.25 - Permit content.

    Science.gov (United States)

    2010-07-01

    ... such reports; and (ii) Prompt reporting of any deviations from permit requirements, including those... “prompt” in the permit for each situation and will do so in relation to the degree and type of deviation... reasonable times any facilities, equipment (including monitoring and air pollution control equipment...

  8. Rosebud Casino and Hotel NPDES Proposed Permit

    Science.gov (United States)

    Indian Country, Minor Permit, proposed permit SD-0034584, Rosebud Casino and Hotel, South Dakota, is authorized to discharge from its wastewater treatment facility in Todd County, South Dakota to an unnamed drainageway(s) tributary to Rock Creek.

  9. Hanford facility dangerous waste Part A, Form 3, and Part B permit application documentation for the Central Waste Complex (WA7890008967) (TSD: TS-2-4)

    International Nuclear Information System (INIS)

    Saueressig, D.G.

    1998-01-01

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, operating, treatment, storage, and/or disposal units, such as the Central Waste Complex (this document, DOE/RL-91-17). Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1996) and the U.S. Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needed by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. For ease of reference, the Washington State Department of Ecology alpha-numeric section identifiers from the permit application guidance documentation (Ecology 1996) follow, in brackets, the chapter headings and subheadings. A checklist indicating where information is contained in the Central Waste Complex permit application documentation, in relation to the Washington State Department of Ecology guidance, is located in the Contents section. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Wherever appropriate, the Central Waste Complex permit application documentation makes cross-reference to the General Information Portion, rather than duplicating text. Information provided in this Central Waste Complex permit application documentation is current as of May 1998

  10. 300 area TEDF permit compliance monitoring plan

    International Nuclear Information System (INIS)

    BERNESKI, L.D.

    1998-01-01

    This document presents the permit compliance monitoring plan for the 300 Area Treated Effluent Disposal Facility (TEDF). It addresses the compliance with the National Pollutant Discharge Elimination System (NPDES) permit and Department of Natural Resources Aquatic Lands Sewer Outfall Lease

  11. 300 area TEDF permit compliance monitoring plan

    Energy Technology Data Exchange (ETDEWEB)

    BERNESKI, L.D.

    1998-11-20

    This document presents the permit compliance monitoring plan for the 300 Area Treated Effluent Disposal Facility (TEDF). It addresses the compliance with the National Pollutant Discharge Elimination System (NPDES) permit and Department of Natural Resources Aquatic Lands Sewer Outfall Lease.

  12. 340 Facility compliance assessment

    International Nuclear Information System (INIS)

    English, S.L.

    1993-10-01

    This study provides an environmental compliance evaluation of the RLWS and the RPS systems of the 340 Facility. The emphasis of the evaluation centers on compliance with WAC requirements for hazardous and mixed waste facilities, federal regulations, and Westinghouse Hanford Company (WHC) requirements pertinent to the operation of the 340 Facility. The 340 Facility is not covered under either an interim status Part A permit or a RCRA Part B permit. The detailed discussion of compliance deficiencies are summarized in Section 2.0. This includes items of significance that require action to ensure facility compliance with WAC, federal regulations, and WHC requirements. Outstanding issues exist for radioactive airborne effluent sampling and monitoring, radioactive liquid effluent sampling and monitoring, non-radioactive liquid effluent sampling and monitoring, less than 90 day waste storage tanks, and requirements for a permitted facility

  13. Improved Emission Spectrographic Facility

    International Nuclear Information System (INIS)

    Goergen, C.R.; Lethco, A.J.; Hosken, G.B.; Geckeler, D.R.

    1980-10-01

    The Savannah River Plant's original Emission Spectrographic Laboratory for radioactive samples had been in operation for 25 years. Due to the deteriorated condition and the fire hazard posed by the wooden glove box trains, a project to update the facility was funded. The new laboratory improved efficiency of operation and incorporated numerous safety and contamination control features

  14. Wastewater treatment facilities: Energy efficient improvements and cogeneration

    International Nuclear Information System (INIS)

    Kunkle, R.; Gray, R.; Delzel, D.

    1992-10-01

    The Washington State Energy Office (WSEO) has worked with both the Bonneville Power Administration (BPA) and the US Department of Energy to provide technical and financial assistance to local governments. Based on a recent study conducted by Ecotope for WSEO, local governments spend an estimated $45 million on utility bills statewide. Water and wastewater facilities account for almost a third of this cost. As a result, WSEO decided to focus its efforts on the energy intensive water and wastewater sector. The ultimate goal of this project was to develop mechanisms to incorporate energy efficiency improvements into wastewater treatment facilities in retrofits and during upgrades, remodels, and new construction. Project activities included the following: The review of the existing regulatory environment for treatment system construction, A summary of financing options for efficiency improvements in treatment facilities, A literature review of energy efficiency opportunities in treatment plants, Survey and site visits to characterize existing facilities in Washington State, Estimates of the energy efficiency and cogeneration potential in the sector, and A case study to illustrate the implementation of an efficiency improvement in a treatment facility

  15. Swiss electricity statistics 2007; Schweizerische Elektrizitaetsstatistik 2007/Statistique suisse de l'electricite 2007

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-07-01

    This comprehensive report made by the Swiss Federal Office of Energy (SFOE) presents the statistics on electricity production and usage in Switzerland for the year 2007. First of all, an overview of Switzerland's electricity supply in 2007 is presented. Details are noted of the amounts generated by different sources including nuclear, hydro-power, storage schemes and thermal power stations as well as energy transfer with neighbouring countries. A second chapter takes a look at the balance of imports and exports with illustrative flow diagrams along with tables for total figures from 1950 through to 2007. For the summer and winter periods, figures from 1997 to 2007 are presented. The third chapter examines the production of electricity in the various types of power stations and the developments over the years 1950 to 2007, whereby, for example, statistics on regional generation and power station type are looked at. The fourth chapter looks at electricity consumption in various sectors from 1984 to 2007 and compares the figures with international data. The fifth chapter looks at generation, consumption and loading on particular, selected days and chapter six considers energy exchange with Switzerland's neighbours. Chapter seven takes a look at possibilities for extending generation facilities in the period up to 2014.

  16. 40 CFR 270.65 - Research, development, and demonstration permits.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Research, development, and... Special Forms of Permits § 270.65 Research, development, and demonstration permits. (a) The Administrator may issue a research, development, and demonstration permit for any hazardous waste treatment facility...

  17. 75 FR 34766 - Receipt of Applications for Permit

    Science.gov (United States)

    2010-06-18

    ... permit to export one female captive bred giant panda (Ailuropoda melanoleuca) born at the zoo in 2007and.... Applicant: United States Department of Agriculture/Animal and Plant Health Inspection Service/Wildlife...

  18. Air Quality Facilities

    Data.gov (United States)

    Iowa State University GIS Support and Research FacilityFacilities with operating permits for Title V of the Federal Clean Air Act, as well as facilities required to submit an air emissions inventory, and other facilities...

  19. The National Ignition Facility 2007 laser performance status

    Energy Technology Data Exchange (ETDEWEB)

    Haynam, C A; Sacks, R A; Wegner, P J; Bowers, M W; Dixit, S N; Erbert, G V; Heestand, G M; Henesian, M A; Hermann, M R; Jancaitis, K S; Manes, K R; Marshall, C D; Mehta, N C; Menapace, J; Nostrand, M C; Orth, C D; Shaw, M J; Sutton, S B; Williams, W H; Widmayer, C C [Lawrence Livermore National Laboratory, 7000 East Avenue, Livermore, CA, 94550 (United States)], E-mail: haynam1@llnl.gov (and others)

    2008-05-15

    The National Ignition Facility (NIF) at Lawrence Livermore National Laboratory contains a 192-beam 3.6 MJ neodymium glass laser that is frequency converted to 351nm light. It has been designed to support high energy density science (HEDS), including the demonstration of fusion ignition through Inertial Confinement. To meet this goal, laser design criteria include the ability to generate pulses of up to 1.8-MJ total energy at 351nm, with peak power of 500 TW and precisely-controlled temporal pulse shapes spanning two orders of magnitude. The focal spot fluence distribution of these pulses is conditioned, through a combination of special optics in the 1{omega} (1053 nm) portion of the laser (continuous phase plates), smoothing by spectral dispersion (SSD), and the overlapping of multiple beams with orthogonal polarization (polarization smoothing). In 2006 and 2007, a series of measurements were performed on the NIF laser, at both 1{omega} and 3{omega} (351 nm). When scaled to full 192-beam operation, these results lend confidence to the claim that NIF will meet its laser performance design criteria and that it will be able to simultaneously deliver the temporal pulse shaping, focal spot conditioning, peak power, shot-to-shot reproducibility, and power balance requirements of indirect-drive fusion ignition campaigns. We discuss the plans and status of NIF's commissioning, and the nature and results of these measurement campaigns.

  20. State waste discharge permit application for the 200 Area Effluent Treatment Facility and the State-Approved Land Disposal Site

    International Nuclear Information System (INIS)

    1993-08-01

    Application is being made for a permit pursuant to Chapter 173--216 of the Washington Administrative Code (WAC), to discharge treated waste water and cooling tower blowdown from the 200 Area Effluent Treatment Facility (ETF) to land at the State-Approved Land Disposal Site (SALDS). The ETF is located in the 200 East Area and the SALDS is located north of the 200 West Area. The ETF is an industrial waste water treatment plant that will initially receive waste water from the following two sources, both located in the 200 Area on the Hanford Site: (1) the Liquid Effluent Retention Facility (LERF) and (2) the 242-A Evaporator. The waste water discharged from these two facilities is process condensate (PC), a by-product of the concentration of waste from DSTs that is performed in the 242-A Evaporator. Because the ETF is designed as a flexible treatment system, other aqueous waste streams generated at the Hanford Site may be considered for treatment at the ETF. The origin of the waste currently contained in the DSTs is explained in Section 2.0. An overview of the concentration of these waste in the 242-A Evaporator is provided in Section 3.0. Section 4.0 describes the LERF, a storage facility for process condensate. Attachment A responds to Section B of the permit application and provides an overview of the processes that generated the wastes, storage of the wastes in double-shell tanks (DST), preliminary treatment in the 242-A Evaporator, and storage at the LERF. Attachment B addresses waste water treatment at the ETF (under construction) and the addition of cooling tower blowdown to the treated waste water prior to disposal at SALDS. Attachment C describes treated waste water disposal at the proposed SALDS

  1. RPP Environmental Permits and Related Documentation

    International Nuclear Information System (INIS)

    DEXTER, M.L.

    2001-01-01

    This document contains the current list of environmental permits and related documentation for RPP facilities and activities. Copies of these permits and related approvals are maintained by RPP Environmental. In addition, notices of Correction and Notices of Violation are issued by State and Federal Regulators which are tracked by RPP Environmental to resolve any recently identified deficiencies. A listing of these recent Notices is provided as an attachment to this document. These permits, approval conditions, and recent regulatory agency notices, constitute an important element of the RPP Authorization Envelope. Permits are issued frequently and the reader is advised to check with RPP environmental for new permits or approval conditions. Interpretation of permit or approval conditions should be coordinated with RPP Environmental. This document is updated on a quarterly basis

  2. RPP Environmental Permits and Related Documentation

    International Nuclear Information System (INIS)

    DEXTER, M.L.

    2000-01-01

    This document contains the current list of environmental permits and related documentation for RPP facilities and activities. Copies of these permits and related approvals are maintained by RPP Environmental. In addition, Notices of Correction and Notices of Violation are issued by State and Federal Regulators which are tracked by RPP Environmental to resolve any recently identified deficiencies. A listing of these recent Notices is provided as an attachment to this document. These permits, approval conditions, and recent regulatory agency notices, constitute an important element of the RPP Authorization Envelope. Permits are issued frequently and the reader is advised to check with RPP environmental for new permits or approval conditions. Interpretation of permit or approval conditions should be coordinated with RPP Environmental. This document will be updated on a quarterly basis

  3. 78 FR 48029 - Improving Chemical Facility Safety and Security

    Science.gov (United States)

    2013-08-07

    ... Improving Chemical Facility Safety and Security By the authority vested in me as President by the... at reducing the safety risks and security risks associated with hazardous chemicals. However... to further improve chemical facility safety and security in coordination with owners and operators...

  4. Decommissioning nuclear facilities

    International Nuclear Information System (INIS)

    Harmon, K.M.; Jenkins, C.E.; Waite, D.A.; Brooksbank, R.E.; Lunis, B.C.; Nemec, J.F.

    1976-01-01

    This paper describes the currently accepted alternatives for decommissioning retired light water reactor fuel cycle facilities and the current state of decommissioning technology. Three alternatives are recognized: Protective Storage; Entombment; and Dismantling. Application of these alternatives to the following types of facilities is briefly described: light water reactors; fuel reprocessing plants, and mixed oxide fuel fabrication plants. Brief descriptions are given of decommissioning operations and results at a number of sites, and recent studies of the future decommissioning of prototype fuel cycle facilities are reviewed. An overview is provided of the types of operations performed and tools used in common decontamination and decommissioning techniques and needs for improved technology are suggested. Planning for decommissioning a nuclear facility is dependent upon the maximum permitted levels of residual radioactive contamination. Proposed guides and recently developed methodology for development of site release criteria are reviewed. 21 fig, 32 references

  5. Spring 2009 Semiannual (III.H. and I.U.) Report for the HWMA/RCRA Post-Closure Permit for the INTEC Waste Calcining Facility at the INL Site

    International Nuclear Information System (INIS)

    Boehmer, Ann M.

    2009-01-01

    The Waste Calcining Facility is located at the Idaho Nuclear Technology and Engineering Center. In 1999, the Waste Calcining Facility was closed under and approved Hazardous Waste Management Act/Resource Conservation and Recovery Act Closure plan. Vessels and spaces were grouted and then covered with a concrete cap. This permit sets forth procedural requirements for groundwater characterization and monitoring, maintenance, and inspections of the Waste Calcining Facility to ensure continued protection of human health and the environment.

  6. Spring 2009 Semiannual (III.H. and I.U.) Report for the HWMA/RCRA Post-Closure Permit for the INTEC Waste Calcining Facility at the INL Site

    Energy Technology Data Exchange (ETDEWEB)

    Boehmer, Ann M.

    2009-05-31

    The Waste Calcining Facility is located at the Idaho Nuclear Technology and Engineering Center. In 1999, the Waste Calcining Facility was closed under and approved Hazardous Waste Management Act/Resource Conservation and Recovery Act Closure plan. Vessels and spaces were grouted and then covered with a concrete cap. This permit sets forth procedural requirements for groundwater characterization and monitoring, maintenance, and inspections of the Waste Calcining Facility to ensure continued protection of human health and the environment.

  7. EPA Facility Registry Service (FRS): AIRS_AFS Sub Facilities

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Air Facility System (AFS) contains compliance and permit data for stationary sources regulated by EPA, state and local air pollution agencies. The sub facility...

  8. Coping with EPA's new petroleum industry storm water permits

    International Nuclear Information System (INIS)

    Veal, S.C.; Whitescarver, J.P.

    1994-01-01

    The United States Environmental Protection Agency has just released for public comment its so-called multi-sector industry specific storm water permit. This permit -- developed in response to the 730 group storm water permit applications submitted in 1992 to EPA -- proposes the establishment of specific runoff sampling and facility design requirements for at least two petroleum industry sectors. This proposed permit establishes specific conditions for the oil and gas extraction section (SIC group 13) and for lubricant manufacturers (SIC 2992). Permit conditions are also established for allied industrial sectors such as the chemical, transportation and asphalt materials industries. By most standards, the proposed permit is much tougher than EPA's baseline general permit for storm water discharges which was released in September of 1992. For example, under the proposal, most industries are required to perform periodic storm water sampling. EPA has also established storm water effluent and performance standards for several industrial categories. This paper will discuss the petroleum industry specific conditions of the new permit. The paper will also discuss the results of the industry-wide storm water sampling efforts undertaken by more than 300 oil patch facilities across the country. In particular, sampling results will be discussed in the context to the permit conditions proposed by EPA. The paper will also discuss strategies for dealing with the new permits

  9. RCRA Permit for a Hazardous Waste Management Facility Permit Number NEV HW0101 Annual Summary/Waste Minimization Report Calendar Year 2012, Nevada National Security Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    Arnold, P. M.

    2013-02-21

    This report summarizes the U.S. Environmental Protection Agency (EPA) identification number of each generator from which the Permittee received a waste stream, a description and quantity of each waste stream in tons and cubic feet received at the facility, the method of treatment, storage, and/or disposal for each waste stream, a description of the waste minimization efforts undertaken, a description of the changes in volume and toxicity of waste actually received, any unusual occurrences, and the results of tank integrity assessments. This Annual Summary/Waste Minimization Report is prepared in accordance with Section 2.13.3 of Permit Number NEV HW0101, issued 10/17/10.

  10. 43 CFR 13.2 - Application for permit.

    Science.gov (United States)

    2010-10-01

    ..., Education, and Welfare under the Randolph-Sheppard Vending Stand Act may apply for permits to establish and maintain vending facilities, including both vending stands and machines, to be operated by blind persons... Public Lands: Interior Office of the Secretary of the Interior VENDING FACILITIES OPERATED BY BLIND...

  11. JAEA Takasaki annual report 2007

    International Nuclear Information System (INIS)

    Tanaka, Shigeru

    2008-11-01

    JAEA Takasaki annual report 2007 describes research and development activities performed from April 1, 2007 to March 31, 2008 with Takasaki Ion Accelerators for Advanced Radiation Application (TIARA, four ion accelerators), and electron/gamma-ray irradiation facilities (an electron accelerator and three 60 Co gamma-ray irradiation facilities) at Takasaki Advanced Radiation Research Institute, Japan Atomic Energy Agency (JAEA Takasaki). These activities are classified into four research fields: 1) space, nuclear and energy engineering, 2) environment conservation and resource security, 3) biotechnology and medical application, and 4) advanced materials, analysis and novel technology. This annual report contains 174 reports consisting of 166 research papers and 8 status reports on operation/maintenance of the irradiation facilities described above, and a list of publications, related press-releases, TV programs, patents, and the type of research collaborations as Appendices. (author)

  12. 43 CFR 13.4 - Terms of permit.

    Science.gov (United States)

    2010-10-01

    ... § 13.4 Terms of permit. Every permit shall describe the location of the vending facilities and shall be... Interior bureau or office for each location. The head of the Interior bureau or office may require... efficiency as may be prescribed by the head of the Interior bureau or office. Such standards shall conform...

  13. Straighttalk. The ideal master facility plan begins with business strategy and integrates operational improvement.

    Science.gov (United States)

    Powder, Scott; Brown, Richard E; Haupert, John M; Smith, Ryder

    2007-04-02

    Given the scarcity of capital to meet ever-growing demands for healthcare services, master facility planning has become more important than ever. Executives must align their master facility plans with their overall business strategy, incorporating the best in care- and service-delivery models. In this installment of Straight Talk, executives from two health systems--Advocate Health Care in Oak Brook, Ill. and Parkland Health & Hospital System in Dallas--discuss master facility planning. Modern Healthcare and PricewaterhouseCoopers present Straight Talk. The session on master facility planning was held on March 8, 2007 at Modern Healthcare's Chicago Headquarters. Charles Lauer, former vice president of publishing and editorial director at Modern Healthcare, was the moderator.

  14. Improvement of Oil-Vapor Treatment Facility for Wolsong Unit 3,4

    International Nuclear Information System (INIS)

    Kim, Jeong Guk; Kwon, S. W.; Lee, H. S.

    2009-11-01

    With the purpose to minimize an oil-vapor discharge to the atmosphere and to be an environmentally friendly nuclear power plant by an improvement of mist eliminator for turbine lubricant system at Wolsong Nuclear Power Plant Unit 3,4, this project - project name : Improvement of Oil-vapor Treatment Facility for Wolsong Unit 3,4 - was conducted for six months (from Apr. 15, 2009 to Oct. 14, 2009). This Project contains Oil-vapor Source and Environmental Regulation, Analysis on the Present Oil-vapor Treatment Facility, Improvement of Oil-vapor Treatment Facility, Test Facility Design, Fabrication, Installation, Test Operation, Evaluation of the Facility

  15. Improving and extending performance at synchrotron radiation facilities

    International Nuclear Information System (INIS)

    Jackson, A.

    1997-05-01

    Synchrotron radiation facilities around the world have now matured through three generations. The latest facilities have all met or exceeded their design specifications and are learning how to cope with the ever more demanding requests of the user community, especially concerning beam stability. The older facilities remain competitive by extending the unique features of their design, and by developing novel insertion devices. In this paper we survey the beam characteristics achieved at third-generation sources and explore the improvements made at earlier generation facilities

  16. Annual Hanford Site Environmental Permitting status report

    International Nuclear Information System (INIS)

    SONNICHSEN, J.C.

    1999-01-01

    The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. Condition II.W further specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of this Permit Condition, ''best efforts'' mean submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies

  17. Annual report of the Neutron Irradiation and Testing Reactor Center. FY2007. April 1, 2007 - March 31, 2008

    International Nuclear Information System (INIS)

    2009-03-01

    The Japan Materials Testing Reactor (JMTR), achieving first criticality in March 1968, has been used in testing the durability and integrity of reactor fuels and components, basic nuclear research, the production of radioisotopes (RIs), and other purposes. The JMTR, however, stopped in August 2006 after its 165th operation cycle, and is currently under going partial renewal of reactor facilities and installation of new irradiation Facilities, geared toward being restarted in 2011. In addition, to cope with the strong requests from users to improve usability of the JMTR, efforts are being made to increase reactor operation efficiency, shorten the turnaround time for obtaining results, and other necessary tasks for JMTR to commence reoperation. The present report summarizes the activities carried out in 2007 for the refurbishment and restart of JMTR. (author)

  18. Engineering report for interim solids removal modifications of the Steam Plant Wastewater Treatment Facility

    International Nuclear Information System (INIS)

    1995-04-01

    The Steam Plant Wastewater Treatment Facility (SPWTF) treats wastewater from the Y-12 Plant coal yard, steam plant, and water demineralizer facility. The facility is required to comply with National Pollutant Discharge Elimination System (NPDES) standards prior to discharge to East Fork Poplar Creek (EFPC). The existing facility was designed to meet Best Available Technology (BAT) standards and has been in operation since 1988. The SPWTF has had intermittent violations of the NPDES permit primarily due to difficulties in complying with the limit for total iron of 1.0 ppM. A FY-1997 Line Item project, SPWTF Upgrades, is planned to improve the capabilities of the SPWTF to eliminate non-compliances with the permit limits. The intent of the Interim Solids Removal Modification project is to improve the SPWTF effluent quality and to provide pilot treatment data to assist in the design and implementation of the SPWTF Upgrades Line Item Project

  19. Grout treatment facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1992-07-01

    The Grout Treatment Facility (GTF) will provide permanent disposal for approximately 43 Mgal of radioactive liquid waste currently being stored in underground tanks on the Hanford Site. The first step in permanent disposal is accomplished by solidifying the low-level liquid waste with cementitious dry materials. The resulting grout is cast within underground vaults. This report on the GTF contains information on the following: Hanford Site Maps, road evaluation for the grout treatment facility, Department of Ecology certificate of non-designation for centralia fly ash, double-shell tank waste compositional modeling, laboratory analysis reports for double-shell tank waste, stored in tanks 241-AN-103, 241-AN-106, and 241-AW-101, grout vault heat transfer results for M-106 grout formulation, test results for extraction procedure toxicity testing, test results for toxicity testing of double-shell tank grout, pilot-scale grout production test with a simulated low-level waste, characterization of simulated low-level waste grout produced in a pilot-scale test, description of the procedure for sampling nonaging waste storage tanks, description of laboratory procedures, grout campaign waste composition verification, variability in properties of grouted phosphate/sulfate N-reactor waste, engineering drawings, description of operating procedures, equipment list--transportable grout equipment, grout treatment facility--tank integrity assessment plan, long-term effects of waste solutions on concrete and reinforcing steel, vendor information, grout disposal facilities construction quality assurance plan, and flexible membrane liner/waste compatibility test results

  20. Burn-center quality improvement: are burn outcomes dependent on admitting facilities and is there a volume-outcome "sweet-spot"?

    Science.gov (United States)

    Hranjec, Tjasa; Turrentine, Florence E; Stukenborg, George; Young, Jeffrey S; Sawyer, Robert G; Calland, James F

    2012-05-01

    Risk factors of mortality in burn patients such as inhalation injury, patient age, and percent of total body surface area (%TBSA) burned have been identified in previous publications. However, little is known about the variability of mortality outcomes between burn centers and whether the admitting facilities or facility volumes can be recognized as predictors of mortality. De-identified data from 87,665 acute burn observations obtained from the National Burn Repository between 2003 and 2007 were used to estimate a multivariable logistic regression model that could predict patient mortality with reference to the admitting burn facility/facility volume, adjusted for differences in age, inhalation injury, %TBSA burned, and an additional factor, percent full thickness burn (%FTB). As previously reported, all three covariates (%TBSA burned, inhalation injury, and age) were found to be highly statistically significant risk factors of mortality in burn patients (P value improve the multivariable model. The treatment/admitting facility was found to be an independent mortality predictor, with certain hospitals having increased odds of death and others showing a protective effect (decreased odds ratio). Hospitals with high burn volumes had the highest risk of mortality. Mortality outcomes of patients with similar risk factors (%TBSA burned, inhalation injury, age, and %FTB) are significantly affected by the treating facility and their admission volumes.

  1. Group NPDES stormwater permit application: The Conoco experience

    International Nuclear Information System (INIS)

    Holler, J.D.

    1993-01-01

    The US Environmental Protection Agency (USEPA) has reported that stormwater runoff is a major cause of pollution and use impairment to waters of the nation. Diffuse pollution sources (stormwater runoff) are increasingly important as controls for industrial process dischargers. On November 16, 1990 the Federal Clean Water Act National Pollutant Discharge Elimination System (NPDES) rules governing the discharge of stormwater were published (56 FR 40948). These rules potentially affect every type of business enterprise conducting work ''associated with industrial activity.'' Dischargers of stormwater associated with industrial activity ar required to either seek coverage under a federal or state general permit using notice of intent, apply for an individual permit, or apply for a permit through a two-part group application process. Conoco, Inc. Supply and Transportation (S and T) elected the latter alternative to attempt to comply with these new evolving complex, broad-ranging permitting requirements. This paper discusses specific details of S and T's strategy, BMP designs, data acquisition activities, monitoring results, as well as economic impacts on the corporation as a result of storm water permit requirements. S and T operates approximately 170 unique wholly and jointly owned petroleum product storage and transport facilities across the nation. Approximately one-third of these facilities were subject to stormwater permit application requirements

  2. Annual Report 2007. Nuclear Regulatory Authority

    International Nuclear Information System (INIS)

    2008-01-01

    The present Annual Report of Activities of the Nuclear Regulatory Authority (ARN), prepared regularly from the creation as independent institution, describes across tree parts and seven annexes the activities developed by the organism during 2007. The main topic are: the organization and the activity of the ARN; the regulatory standards; the licensing and inspection of nuclear power plants and critical facilities; the emergency systems; the occupational surveillance; the environmental monitoring; improved organizational. Also, this publication have annexes with the following content: regulatory documents; inspections to medical, industrial and training installations; regulatory guides; measurement and evaluation of the drinking water of Ezeiza.

  3. Resource Conservation and Recovery Act, Part B Permit Application

    International Nuclear Information System (INIS)

    1992-01-01

    This report, Part B (Vol. 3) of the permit application for the WIPP facility, contains information related to the site characterization of the facility, including geology, design, rock salt evaluations, maps, drawings, and shaft excavations

  4. System and safety studies of accelerator driven systems for transmutation. Annual report 2007

    International Nuclear Information System (INIS)

    Arzhanov, Vasily; Fokau, Andrei; Persson, Calle; Runevall, Odd; Sandberg, Nils; Tesinsky, Milan; Wallenius, Janne; Youpeng Zhang

    2008-05-01

    Within the project 'System and safety studies of accelerator driven systems for transmutation', research on design and safety of sub-critical reactors for recycling of minor actinides is performed. During 2007, the reactor physics division at KTH has calculated safety parameters for EFIT-400 with cermet fuel, permitting to start the transient safety analysis. The accuracy of different reactivity meters applied to the YALINA facility was assessed and neutron detection studies were performed. A model to address deviations from point kinetic behaviour was developed. Studies of basic radiation damage physics included calculations of vacancy formation and activation enthalpies in bcc niobium. In order to predict the oxygen potential of inert matrix fuels, a thermo-chemical model for mixed actinide oxides was implemented in a phase equilibrium code

  5. Wastewater Treatment Facilities

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — Individual permits for municipal, industrial, and semi-public wastewater treatment facilities in Iowa for the National Pollutant Discharge Elimination System (NPDES)...

  6. Lung Focused Resuscitation at a Specialized Donor Care Facility Improves Lung Procurement Rates.

    Science.gov (United States)

    Chang, Stephanie H; Kreisel, Daniel; Marklin, Gary F; Cook, Lindsey; Hachem, Ramsey; Kozower, Benjamin D; Balsara, Keki R; Bell, Jennifer M; Frederiksen, Christine; Meyers, Bryan F; Patterson, G Alexander; Puri, Varun

    2018-05-01

    Lung procurement for transplantation occurs in approximately 20% of brain dead donors and is a major impediment to wider application of lung transplantation. We investigated the effect of lung protective management at a specialized donor care facility on lung procurement rates from brain dead donors. Our local organ procurement organization instituted a protocol of lung protective management at a freestanding specialized donor care facility in 2008. Brain dead donors from 2001 to 2007 (early period) were compared with those from 2009 to 2016 (current period) for lung procurement rates and other solid-organ procurement rates using a prospectively maintained database. An overall increase occurred in the number of brain dead donors during the study period (early group, 791; late group, 1,333; p procurement rate (lung donors/all brain dead donors) improved markedly after the introduction of lung protective management (early group, 157 of 791 [19.8%]; current group, 452 of 1,333 [33.9%]; p procurement rate (total number of organs procured/donor) also increased during the study period (early group, 3.5 organs/donor; current group, 3.8 organs/donor; p = 0.006). Lung protective management in brain dead donors at a specialized donor care facility is associated with higher lung utilization rates compared with conventional management. This strategy does not adversely affect the utilization of other organs in a multiorgan donor. Copyright © 2018 The Society of Thoracic Surgeons. Published by Elsevier Inc. All rights reserved.

  7. BWR Full Integral Simulation Test (FIST) program: facility description report

    International Nuclear Information System (INIS)

    Stephens, A.G.

    1984-09-01

    A new boiling water reactor safety test facility (FIST, Full Integral Simulation Test) is described. It will be used to investigate small breaks and operational transients and to tie results from such tests to earlier large-break test results determined in the TLTA. The new facility's full height and prototypical components constitute a major scaling improvement over earlier test facilities. A heated feedwater system, permitting steady-state operation, and a large increase in the number of measurements are other significant improvements. The program background is outlined and program objectives defined. The design basis is presented together with a detailed, complete description of the facility and measurements to be made. An extensive component scaling analysis and prediction of performance are presented

  8. Money Market Operations in Fiscal 2007

    OpenAIRE

    Financial Markets Department

    2008-01-01

    Throughout fiscal 2007, the Bank of Japan conducted money market operations with the uncollateralized overnight call rate as the operating target. The target level for the uncollateralized overnight call rate remained at "around 0.5 percent" throughout all of fiscal 2007. During this period, the basic loan rate applied to the complementary lending facility was 0.75 percent.

  9. Region 9 NPDES Facilities - Waste Water Treatment Plants

    Science.gov (United States)

    Point geospatial dataset representing locations of NPDES Waste Water Treatment Plant Facilities. NPDES (National Pollution Discharge Elimination System) is an EPA permit program that regulates direct discharges from facilities that discharge treated waste water into waters of the US. Facilities are issued NPDES permits regulating their discharge as required by the Clean Water Act. A facility may have one or more outfalls (dischargers). The location represents the facility or operating plant.

  10. NDA for a new facility at SRP

    International Nuclear Information System (INIS)

    Studley, R.V.

    1987-01-01

    In 1980, plans were initiated to build a new facility to process high purity highly enriched 235 U. Interest in improving nuclear safeguards had been increasing in the previous few years. A basic objective of the design, therefore, included achievement of maximum performance in special nuclear material (SNM) accountability. A near-real-time accountability system with high accuracy assay measurements was developed for this purpose. Simultaneous design of facility, process equipment, and the accountability system allowed maximum integration of equipment and also permitted influence on process design and material characteristics to optimize accountability performance. This was an ideal situation in which to pursue maximum improvement in nondestructive assay (NDA) measurement performance. The resulting systems are described

  11. Facility Effluent Monitoring Plan for Pacific Northwest National Laboratory Balance-of-Plant Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Ballinger, Marcel Y.; Gervais, Todd L.

    2004-11-15

    located downstream of control technologies and just before discharge to the atmosphere. The need for monitoring airborne emissions of hazardous chemicals is established in the Hanford Site Air Operating Permit and in notices of construction. Based on the current potential-to-emit, the Hanford Site Air Operating Permit does not contain general monitoring requirements for BOP facilities. However, the permit identifies monitoring requirements for specific projects and buildings. Needs for future monitoring will be established by future permits issued pursuant to the applicable state and federal regulations. A number of liquid-effluent discharge systems serve the BOP facilities: sanitary sewer, process sewer, retention process sewer, and aquaculture system. Only the latter system discharges to the environment; the rest either discharge to treatment plants or to long-term storage. Routine compliance sampling of liquid effluents is only required at the Environmental Molecular Sciences Laboratory. Liquid effluents from other BOP facilities may be sampled or monitored to characterize facility effluents or to investigate discharges of concern. Effluent sampling and monitoring for the BOP facilities depends on the inventories, activities, and environmental permits in place for each facility. A description of routine compliance monitoring for BOP facilities is described in the BOP FEMP.

  12. Improving Quality of Care in Primary Health-Care Facilities in Rural Nigeria

    Science.gov (United States)

    Ugo, Okoli; Ezinne, Eze-Ajoku; Modupe, Oludipe; Nicole, Spieker; Kelechi, Ohiri

    2016-01-01

    Background: Nigeria has a high population density but a weak health-care system. To improve the quality of care, 3 organizations carried out a quality improvement pilot intervention at the primary health-care level in selected rural areas. Objective: To assess the change in quality of care in primary health-care facilities in rural Nigeria following the provision of technical governance support and to document the successes and challenges encountered. Method: A total of 6 states were selected across the 6 geopolitical zones of the country. However, assessments were carried out in 40 facilities in only 5 states. Selection was based on location, coverage, and minimum services offered. The facilities were divided randomly into 2 groups. The treatment group received quality-of-care assessment, continuous feedback, and improvement support, whereas the control group received quality assessment and no other support. Data were collected using the SafeCare Healthcare Standards and managed on the SafeCare Data Management System—AfriDB. Eight core areas were assessed at baseline and end line, and compliance to quality health-care standards was compared. Result: Outcomes from 40 facilities were accepted and analyzed. Overall scores increased in the treatment facilities compared to the control facilities, with strong evidence of improvement (t = 5.28, P = .0004) and 11% average improvement, but no clear pattern of improvement emerged in the control group. Conclusion: The study demonstrated governance support and active community involvement offered potential for quality improvement in primary health-care facilities. PMID:28462280

  13. Storm Water General Permit 2 for Construction

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — General permit #2 for storm water discharges associated with industrial activity for Construction Activities in Iowa for the National Pollutant Discharge Elimination...

  14. Annual Report 2007

    International Nuclear Information System (INIS)

    Zielinska, M.; Gawlikowicz, W.

    2008-03-01

    The Annual Report of the Heavy Ion Laboratory, Warsaw University describes the activities of Laboratory in 2007. The document consist of four parts: '' Laboratory Overview '', '' Experiments and Experimental Set-ups '', '' Experiments Using the Outside Facilities '' and '' General Information on HIL Activities ''. An '' Introduction '' written by director of the Department prof. J. Jastrzebski is also given

  15. System and safety studies of accelerator driven systems for transmutation. Annual report 2007

    Energy Technology Data Exchange (ETDEWEB)

    Arzhanov, Vasily; Fokau, Andrei; Persson, Calle; Runevall, Odd; Sandberg, Nils; Tesinsky, Milan; Wallenius, Janne; Youpeng Zhang (Div. of Reactor Physics, Royal Institute of Technology, Stockholm (Sweden))

    2008-05-15

    Within the project 'System and safety studies of accelerator driven systems for transmutation', research on design and safety of sub-critical reactors for recycling of minor actinides is performed. During 2007, the reactor physics division at KTH has calculated safety parameters for EFIT-400 with cermet fuel, permitting to start the transient safety analysis. The accuracy of different reactivity meters applied to the YALINA facility was assessed and neutron detection studies were performed. A model to address deviations from point kinetic behaviour was developed. Studies of basic radiation damage physics included calculations of vacancy formation and activation enthalpies in bcc niobium. In order to predict the oxygen potential of inert matrix fuels, a thermo-chemical model for mixed actinide oxides was implemented in a phase equilibrium code

  16. Using Six Sigma and Lean methodologies to improve OR throughput.

    Science.gov (United States)

    Fairbanks, Catharine B

    2007-07-01

    Improving patient flow in the perioperative environment is challenging, but it has positive implications for both staff members and for the facility. One facility in vermont improved patient throughput by incorporating Six Sigma and Lean methodologies for patients undergoing elective procedures. The results of the project were significantly improved patient flow and increased teamwork and pride among perioperative staff members. (c) AORN, Inc, 2007.

  17. Solid Waste Management Facilities with Permits by the Iowa DNR

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — All types of facilities that handle solid waste, including: sanitary landfills, appliance demanufacturing facilities, transfer stations, land application sites,...

  18. RTE - annual report 2007; RTE - rapport d'activite 2007

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    RTE is responsible for operating, maintaining and developing the French electricity transmission network. With the largest network in Europe, made up of some 100,000 km of high and extra high voltage lines and 45 cross-border lines, and a key location at the geographical hub, RTE is a crucial player in the development of the European electricity market. A public service company, RTE's role is to guarantee that the French power network runs smoothly and safely. It provides equitable access to all system users. Part of the EDF group, it is a totally independent company as required by law. Since 2005, RTE has been a limited liability company with an Executive Board and a Supervisory Board and enjoys a status that guarantees due neutrality in providing service to all players on the electricity market. This activity report presents: 1 - Interview with Dominique Maillard President of the Executive Board of RTE; 2 - New momentum, for a new frontier: Overview and key figures of 2007 (Key events of 2007, Governance and organisation of RTE, A new enterprise frontier), A year of initiatives (Customers, Industrial facilities, Environment, Human resources, International activity, Economic and financial results, Glossary); 3 - Supervisory Board Chairman's Report 2007: Editorial, Company administration (Make-up of the Supervisory Board, Functioning of the Supervisory Board, Supervisory Board Works, Economic and Audit Supervisory Committee, Remuneration of managers), Internal control (Internal control policy, Internal control operation, Control-related activities in 2007 (internal and external), Internal control relating to the implementation and processing of accounting and financial data), Assessment and perspectives (2008 Audit Mission Orientations, 2008 Internal Accounting and Financial Audit and Revision Orientations), Additional notes (Organisation of the Accounting and Tax Department); 4 - Management report: Financial and legal information (Key events of 2007, The

  19. Harvest facility protects and improves fishery

    International Nuclear Information System (INIS)

    Hampton, T.; Daley, W.

    1991-01-01

    This paper reports that by constructing a trap and transfer/harvest facility to control anadromous fish migration, the trout fishery on the Boardman River was protected and the salmon fishery was improved. The James P. Price Fish Trap and Transfer/Harvest Facility at Traverse City, Michigan, was constructed by the Traverse City Light and Power Department because of a licensing condition during the redevelopment of the Boardman and Sabin hydroelectric plants. The facility was constructed along with a fish ladder at the Union Street Dam to control the anadromous fish migration in lieu of constructing fish ladders at the Union Street, Sabin and Boardman Dams. The Michigan Department of Natural Resources (MDNR) and the U.S. Fish and Wildlife Service required that the fish ladders be constructed before the hydroelectric plants could be reactivated. The MDNR was also planning to introduce salmon into the Boardman River as far up as the reservoir of the Boardman Dam, which is the third dam from the mouth of the river

  20. Characterization and consequences from CEA nuclear fuel cycle facilities effluents releases - 1995 up to 2007 period

    International Nuclear Information System (INIS)

    Ferreira, Nelson Luiz Dias; Fonseca, Lizandra Pereira de Souza

    2009-01-01

    Discharges to the environment of airborne and/or liquid radioactive effluents from the normal operation of nuclear facilities can become a potential source of radiation exposure to humans. The highest exposed members of the public are defined as the critical group. The requirements for the control and monitoring of radioactive discharges to the environment and the degree of environmental monitoring required are linked to the assessed critical group dose. The assessed dose can be compared to dose constraint, which is a fraction of the annual effective dose to members of the public, as well as the level of exemption specified by the National Commission for Nuclear Energy (CNEN). Effluents releases from the Centro Experimental Aramar (CEA) facilities are registered and described at CEA Effluent Report, semestrally sent to CNEN. Basically, that report provides information related to the type and the quantity of chemical and radioactive substances released to the environment due the routine operation of CEA nuclear fuel cycle facilities (LEI - Isotopic Enrichment Laboratory, USIDE - Pilot Plant for Industrial Verification of Uranium Enrichment and LABMAT - Nuclear Materials Laboratory). CEA Annual Effluent Report includes assessment of the annual effective doses for members of the critical group for the CEA site. This work presents the characterization of the radioactive release source terms and a historical of the critical group annual doses from 1995 up to 2007. (author)

  1. Region 9 NPDES Facilities 2012- Waste Water Treatment Plants

    Science.gov (United States)

    Point geospatial dataset representing locations of NPDES Waste Water Treatment Plant Facilities. NPDES (National Pollution Discharge Elimination System) is an EPA permit program that regulates direct discharges from facilities that discharge treated waste water into waters of the US. Facilities are issued NPDES permits regulating their discharge as required by the Clean Water Act. A facility may have one or more outfalls (dischargers). The location represents the facility or operating plant.

  2. Annual report on operation and management of hot laboratories and facilities. From April 1, 2006 to March 31, 2007

    International Nuclear Information System (INIS)

    2008-02-01

    This is an annual report in a fiscal year 2006 that describes activities of the Reactor Fuel Examination Facility (RFEF), the Waste Safety Testing Facility (WASTEF), the Research Hot Laboratory (RHL) and the other research hot facilities in the Department of Hot laboratories and facilities. In RFEF, destructive examinations of BWR fuel rods and re-assembly were carried out as PIEs for a fuel assembly irradiated for 5 cycles in the Fukushima-2 Nuclear Power Station Unit-1. Mechanical property measurement of high burn-up fuel rods were performed as spent fuel integrity test for long term dry storage in order to formulate guidelines and technical criteria. In WASTEF, Slow Strain Rate Tests (SSRT) and Uni-axial Constant Load Tensile tests (UCLT) of in-core materials in pressurized high-temperature water condition, stress corrosion cracking tests for high-performance fuel cladding material and calorific value measurement of pulse irradiated fuel in NSRR were carried out. In RHL, equipment un-installations and decontamination were performed to lead cells according to the decommissioning plan. And modification of fuel storage room were started in order to utilize the facility for un-irradiated fuel storage after a fiscal year 2007. In addition, management of the other research hot facilities (No.1 Plutonium Laboratory, No.2 Research Laboratory, No.4 Research Laboratory, Analytical Chemistry Laboratory, Uranium Enrichment Laboratory, (Simulation Test for Environmental Radionuclide Migration (STEM), Clean Laboratory for Environmental Analysis and Research (CLEAR) and fuel storage) were carried out. (author)

  3. CXA La Paloma, LLC: UIC Class I Permit No.CA10710001

    Science.gov (United States)

    Documents related to La Paloma Generating Company, LLC's (LPGC) application for a UIC permit renewal (of permit #CA199000001) to operate a Class I injection well facility to dispose of non-hazardous wastewater from the La Paloma Generating Plant.

  4. 10 CFR 205.329 - Environmental requirements for Presidential Permits-Alternative 2.

    Science.gov (United States)

    2010-01-01

    ... Facilities for Transmission of Electric Energy at International Boundaries § 205.329 Environmental... 10 Energy 3 2010-01-01 2010-01-01 false Environmental requirements for Presidential Permits... such Presidential Permits: (1) ERA will determine whether an Environmental Impact Statement (EIS) or an...

  5. Operational status of nuclear facilities in Japan. 2008 edition

    International Nuclear Information System (INIS)

    2008-01-01

    This document is a summary of the outline of the safety regulation administration of nuclear facilities as well as various data on the commercial nuclear power reactor facilities, research and development nuclear power reactor facilities, fabrication facilities, reprocessing facilities, and disposal facilities in fiscal year 2007 (from April 2007 to March 2008). I sincerely hope this document is used widely by many people engaged in work related to ensuring nuclear safety. (J.P.N.)

  6. 10 CFR 51.105 - Public hearings in proceedings for issuance of construction permits or early site permits...

    Science.gov (United States)

    2010-01-01

    ... Commission has previously prepared an environmental impact statement for the construction and operation of a... the limited work authorization, new and significant information on the environmental impacts of those... Utilization Facilities § 51.105 Public hearings in proceedings for issuance of construction permits or early...

  7. 75 FR 41725 - Food Additives Permitted in Feed and Drinking Water of Animals; Ammonium Formate

    Science.gov (United States)

    2010-07-19

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration 21 CFR Part 573 [Docket No. FDA-2008-F-0151] (formerly Docket No. 2007F-0478) Food Additives Permitted in Feed and Drinking Water...: The Food and Drug Administration (FDA) is amending the regulations for food additives permitted in...

  8. Improving water, sanitation and hygiene in health-care facilities, Liberia.

    Science.gov (United States)

    Abrampah, Nana Mensah; Montgomery, Maggie; Baller, April; Ndivo, Francis; Gasasira, Alex; Cooper, Catherine; Frescas, Ruben; Gordon, Bruce; Syed, Shamsuzzoha Babar

    2017-07-01

    The lack of proper water and sanitation infrastructures and poor hygiene practices in health-care facilities reduces facilities' preparedness and response to disease outbreaks and decreases the communities' trust in the health services provided. To improve water and sanitation infrastructures and hygiene practices, the Liberian health ministry held multistakeholder meetings to develop a national water, sanitation and hygiene and environmental health package. A national train-the-trainer course was held for county environmental health technicians, which included infection prevention and control focal persons; the focal persons acted as change agents. In Liberia, only 45% of 701 surveyed health-care facilities had an improved water source in 2015, and only 27% of these health-care facilities had proper disposal for infectious waste. Local ownership, through engagement of local health workers, was introduced to ensure development and refinement of the package. In-county collaborations between health-care facilities, along with multisectoral collaboration, informed national level direction, which led to increased focus on water and sanitation infrastructures and uptake of hygiene practices to improve the overall quality of service delivery. National level leadership was important to identify a vision and create an enabling environment for changing the perception of water, sanitation and hygiene in health-care provision. The involvement of health workers was central to address basic infrastructure and hygiene practices in health-care facilities and they also worked as stimulators for sustainable change. Further, developing a long-term implementation plan for national level initiatives is important to ensure sustainability.

  9. RTE - annual report 2007

    International Nuclear Information System (INIS)

    2007-01-01

    RTE is responsible for operating, maintaining and developing the French electricity transmission network. With the largest network in Europe, made up of some 100,000 km of high and extra high voltage lines and 45 cross-border lines, and a key location at the geographical hub, RTE is a crucial player in the development of the European electricity market. A public service company, RTE's role is to guarantee that the French power network runs smoothly and safely. It provides equitable access to all system users. Part of the EDF group, it is a totally independent company as required by law. Since 2005, RTE has been a limited liability company with an Executive Board and a Supervisory Board and enjoys a status that guarantees due neutrality in providing service to all players on the electricity market. This activity report presents: 1 - Interview with Dominique Maillard President of the Executive Board of RTE; 2 - New momentum, for a new frontier: Overview and key figures of 2007 (Key events of 2007, Governance and organisation of RTE, A new enterprise frontier), A year of initiatives (Customers, Industrial facilities, Environment, Human resources, International activity, Economic and financial results, Glossary); 3 - Supervisory Board Chairman's Report 2007: Editorial, Company administration (Make-up of the Supervisory Board, Functioning of the Supervisory Board, Supervisory Board Works, Economic and Audit Supervisory Committee, Remuneration of managers), Internal control (Internal control policy, Internal control operation, Control-related activities in 2007 (internal and external), Internal control relating to the implementation and processing of accounting and financial data), Assessment and perspectives (2008 Audit Mission Orientations, 2008 Internal Accounting and Financial Audit and Revision Orientations), Additional notes (Organisation of the Accounting and Tax Department); 4 - Management report: Financial and legal information (Key events of 2007, The economic

  10. Hazardous waste incinerator permitting in Texas from inception to operation

    International Nuclear Information System (INIS)

    Simms, M.D.; McDonnell, R.G. III

    1991-01-01

    The regulatory permitting process for hazardous waste incinerators i a long and arduous proposition requiring a well-developed overall strategy. In Texas, RCRA permits for the operation of hazardous waste incinerator facilities are issued through the federally delegated Texas Water Commission (TWC). While the TWC has primacy in the issuance of RCRA permits for hazardous waste incinerators, the Texas Air Control Board (TACB) provides a significant portion of the Part B application review and provides much of the permit language. In addition to dealing with regulatory agencies, RCRA permitting provides by significant public involvement. Often the lack of public support becomes a major roadblock for an incinerator project. In order to establish an effective strategy which addresses the concerns of regulatory agencies and the public, it is important to have an understanding of the steps involved in obtaining a permit. A permit applicant seeking to construct a new hazardous waste incinerator can expect to go through a preapplication meeting with government regulators, a site selection process, file an application, respond to calls for additional technical information from both the TACB and the TWC, defend the application in a hearing, have a recommendation from a TWC hearing examiner and, finally, receive a determination from the TWC's Commissioners. Presuming a favorable response from the Commission, the permittee will be granted a trial burn permit and may proceed with the construction, certification and execution of a trial burn at the facility. Subsequent to publication of the trial burn results and approval by the TWC, the permittee will possess an operational hazardous waste incinerator permit. The paper describes the major steps required to receive an operational permit for a hazardous waste incinerator in the State of Texas. Important issues involved in each step will be discussed including insights gained from recent incinerator permitting efforts

  11. Nuclear reactor facility

    International Nuclear Information System (INIS)

    Wampole, N.C.

    1978-01-01

    In order to improve the performance of manitenance and inspections it is proposed for a nuclear reactor facility with a primary circuit containing liquid metal to provide a thermally insulated chamber, within which are placed a number of components of the primary circuit, as e.g. valves, recirculation pump, heat exchangers. The isolated placement permit controlled preheating on one hand, but prevents undesirable heating of adjacent load-bearing elements on the other. The chamber is provided with heating devices and, on the outside, with cooling devices; it is of advantage to fill it with an inert gas. (UWI) 891 HP [de

  12. Race, wealth, and solid waste facilities in North Carolina.

    Science.gov (United States)

    Norton, Jennifer M; Wing, Steve; Lipscomb, Hester J; Kaufman, Jay S; Marshall, Stephen W; Cravey, Altha J

    2007-09-01

    Concern has been expressed in North Carolina that solid waste facilities may be disproportionately located in poor communities and in communities of color, that this represents an environmental injustice, and that solid waste facilities negatively impact the health of host communities. Our goal in this study was to conduct a statewide analysis of the location of solid waste facilities in relation to community race and wealth. We used census block groups to obtain racial and economic characteristics, and information on solid waste facilities was abstracted from solid waste facility permit records. We used logistic regression to compute prevalence odds ratios for 2003, and Cox regression to compute hazard ratios of facilities issued permits between 1990 and 2003. The adjusted prevalence odds of a solid waste facility was 2.8 times greater in block groups with > or = 50% people of color compared with block groups with or = 100,000 dollars. Among block groups that did not have a previously permitted solid waste facility, the adjusted hazard of a new permitted facility was 2.7 times higher in block groups with > or = 50% people of color compared with block groups with waste facilities present numerous public health concerns. In North Carolina solid waste facilities are disproportionately located in communities of color and low wealth. In the absence of action to promote environmental justice, the continued need for new facilities could exacerbate this environmental injustice.

  13. Third quarter 2007 sales increased by nearly 10%. Sales as at 30 September 2007: -6.5% compared to -11 % as at 30 June 2007. 2007 financial objective confirmed

    International Nuclear Information System (INIS)

    2007-01-01

    Paris, 30 October 2007 - During the third quarter of 2007, The Gaz de France Group achieved sales of euro 4,352 million, an increase of nearly 10 per cent compared to the third quarter of 2006. This growth reflects an improvement in the Group's business activities during the quarter in a background of almost neutral climatic conditions. Due to the good performance of the activities during the quarter, the change in sales over the nine first months of 2007 has improved to -6.5 per cent compared with -11 per cent over the first six months. As at 30 September 2007, Group sales amounted to euro 18,130 million compared to euro 19,391 million for the first nine months of 2006. In France, Group sales rose to euro 10,315 million. This was down by 7 per cent compared to the first nine months of 2006, mainly due to the exceptionally mild weather in the first half of 2007. Outside France, sales amount to euro 7,815 million, representing more than 40 per cent of Group sales. The third quarter of 2007 was also marked by the announcement, on 3 September 2007, of the new strategic direction of the planned merger with Suez. This project should be finalized as soon as possible during the first half of 2008. Gaz de France confirms its 2007 financial objective: '2007 will be a year of consolidation. The gross operating surplus should be in line with that of 2006'. This objective assumes average climate conditions during the last quarter of 2007

  14. Third quarter 2007 sales increased by nearly 10%. Sales as at 30 September 2007: -6.5% compared to -11 % as at 30 June 2007. 2007 financial objective confirmed

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    Paris, 30 October 2007 - During the third quarter of 2007, The Gaz de France Group achieved sales of euro 4,352 million, an increase of nearly 10 per cent compared to the third quarter of 2006. This growth reflects an improvement in the Group's business activities during the quarter in a background of almost neutral climatic conditions. Due to the good performance of the activities during the quarter, the change in sales over the nine first months of 2007 has improved to -6.5 per cent compared with -11 per cent over the first six months. As at 30 September 2007, Group sales amounted to euro 18,130 million compared to euro 19,391 million for the first nine months of 2006. In France, Group sales rose to euro 10,315 million. This was down by 7 per cent compared to the first nine months of 2006, mainly due to the exceptionally mild weather in the first half of 2007. Outside France, sales amount to euro 7,815 million, representing more than 40 per cent of Group sales. The third quarter of 2007 was also marked by the announcement, on 3 September 2007, of the new strategic direction of the planned merger with Suez. This project should be finalized as soon as possible during the first half of 2008. Gaz de France confirms its 2007 financial objective: '2007 will be a year of consolidation. The gross operating surplus should be in line with that of 2006'. This objective assumes average climate conditions during the last quarter of 2007.

  15. Improving Energy Efficiency In Thermal Oil Recovery Surface Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Murthy Nadella, Narayana

    2010-09-15

    Thermal oil recovery methods such as Cyclic Steam Stimulation (CSS), Steam Assisted Gravity Drainage (SAGD) and In-situ Combustion are being used for recovering heavy oil and bitumen. These processes expend energy to recover oil. The process design of the surface facilities requires optimization to improve the efficiency of oil recovery by minimizing the energy consumption per barrel of oil produced. Optimization involves minimizing external energy use by heat integration. This paper discusses the unit processes and design methodology considering thermodynamic energy requirements and heat integration methods to improve energy efficiency in the surface facilities. A design case study is presented.

  16. Lean in Air Permitting Guide

    Science.gov (United States)

    The Lean in Air Permitting Guide is designed to help air program managers at public agencies better understand the potential value and results that can be achieved by applying Lean improvement methods to air permitting processes.

  17. Proposed Issuance of NPDES Permit for NTUA Kayenta WWTF

    Science.gov (United States)

    Public Notice of proposed Issuance of National Pollutant Discharge Elimination System Permit (NPDES No. NN0020281) for Navajo Tribal Utility Authority (“NTUA”) Kayenta Wastewater Treatment Facility.

  18. Permitting and licensing of a commercial mixed waste facility

    International Nuclear Information System (INIS)

    Sinclair, W.J.

    1995-01-01

    Federal and state regulations applicable to the Envirocare commercial mixed waste facility in Utah are discussed, with particular emphasis on Utah State Waste Policy. Waste acceptance standards of the facility are detailed. Design conflicts, due to differences between the U.S. Environmental Protection and the U.S. Nuclear Regulatory Commission, and their subsequent resolution are outlined. Other multi-jurisdictional problems and resolutions are discussed in some detail

  19. Preparation of IHY-2007 in Indonesia: Local Observational Facilities, International Collaborations, and the Use of International Data

    Science.gov (United States)

    Djamaluddin, T.

    2006-11-01

    t_djamal@hotmail.com Since 1980, the National Institute of Aeronautics and Space (LAPAN) has been carrying out integrated observations of solar activities, geomagnetic disturbance, and ionospheric parameters, as well as other solar-terrestrial relationship research. International collaboration, especially with Japan in the field of solar physics, geomagnetism and equatorial atmosphere and with Australia in the field of ionosphere and upper atmosphere, help us in increasing national capacity building. The international data available on the Internet also helps us in comparing our local data with the global one or in fulfilling our needs of data due to lack of facilities, ground based or space based data. Some results will be reviewed. Preparation for IHY-2007 will also be discussed.

  20. PUREX Storage Tunnels dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-12-01

    This report is part of a dangerous waste permit application for the storage of wastes from the Purex process at Hanford. Appendices are presented on the following: construction drawings; HSW-5638, specifications for disposal facility for failed equipment, Project CA-1513-A; HWS-8262, specification for Purex equipment disposal, Project CGC 964; storage tunnel checklist; classification of residual tank heels in Purex storage tunnels; emergency plan for Purex facility; training course descriptions; and the Purex storage tunnels engineering study

  1. Women's education level, maternal health facilities, abortion legislation and maternal deaths: a natural experiment in Chile from 1957 to 2007.

    Science.gov (United States)

    Koch, Elard; Thorp, John; Bravo, Miguel; Gatica, Sebastián; Romero, Camila X; Aguilera, Hernán; Ahlers, Ivonne

    2012-01-01

    The aim of this study was to assess the main factors related to maternal mortality reduction in large time series available in Chile in context of the United Nations' Millennium Development Goals (MDGs). Time series of maternal mortality ratio (MMR) from official data (National Institute of Statistics, 1957-2007) along with parallel time series of education years, income per capita, fertility rate (TFR), birth order, clean water, sanitary sewer, and delivery by skilled attendants were analysed using autoregressive models (ARIMA). Historical changes on the mortality trend including the effect of different educational and maternal health policies implemented in 1965, and legislation that prohibited abortion in 1989 were assessed utilizing segmented regression techniques. During the 50-year study period, the MMR decreased from 293.7 to 18.2/100,000 live births, a decrease of 93.8%. Women's education level modulated the effects of TFR, birth order, delivery by skilled attendants, clean water, and sanitary sewer access. In the fully adjusted model, for every additional year of maternal education there was a corresponding decrease in the MMR of 29.3/100,000 live births. A rapid phase of decline between 1965 and 1981 (-13.29/100,000 live births each year) and a slow phase between 1981 and 2007 (-1.59/100,000 live births each year) were identified. After abortion was prohibited, the MMR decreased from 41.3 to 12.7 per 100,000 live births (-69.2%). The slope of the MMR did not appear to be altered by the change in abortion law. Increasing education level appears to favourably impact the downward trend in the MMR, modulating other key factors such as access and utilization of maternal health facilities, changes in women's reproductive behaviour and improvements of the sanitary system. Consequently, different MDGs can act synergistically to improve maternal health. The reduction in the MMR is not related to the legal status of abortion.

  2. Resource Conservation and Recovery Act Part B permit application

    International Nuclear Information System (INIS)

    1992-01-01

    This permit application (Vol. 7) for the WIPP facility contains appendices related to the following information: Ground water protection; personnel; solid waste management; and memorandums concerning environmental protection standards

  3. Transforming environmental permitting and compliance policies to promote pollution prevention: Removing barriers and providing incentives to foster technology innovation, economic productivity, and environmental protection. Final report

    International Nuclear Information System (INIS)

    Berg, D.R.; Kerr, R.L.; Fleischer, S.; Gorsen, M.; Harris, E.

    1993-04-01

    The Technology Innovation and Economics (TIE) Committee, a standing committee of EPA's National Advisory Council for Environmental Policy and Technology (NACEPT), has concluded that major changes are needed in federal and state permitting and compliance programs to encourage adoption of practical pollution prevention approaches to environmental protection. The Committee recommends seven major areas for improvement, including: (1) Redesigning permit procedures to encourage regulated facilities to expand multi-media and pollution prevention environmental improvement efforts; (2) Accelerating development and use of innovative pollution prevention technologies and techniques through special permitting and review procedures during RD ampersand D and commercialization phases; (3) Developing and expanding federal and state pollution prevention enforcement initiative; (4) Supporting state initiatives in pollution prevention facility planning; (5) Expanding pollution prevention-related training, educational and technology diffusion efforts to better reach managers in all sectors of the economy; (6) Altering personnel reward systems to encourage EPA staff to champion pollution prevention; (7) Expanding and publicizing the system of national awards honoring outstanding pollution prevention research, training and technology implementation

  4. Environmentally Regulated Facilities in Iowa

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — A unique record for each facility site with an environmental interest by DNR (such as permits). This brings together core environmental information in one place for...

  5. Air permitting of IGCC plants

    Energy Technology Data Exchange (ETDEWEB)

    Chitikela, S.R.

    2007-07-01

    The IGCC process is, currently, the preferred choice over conventional thermal power production in regard to cleanup of fuel and significantly reduced contaminant emissions. The air permitting requirements include the review of: feed preparation and PM emissions; feed gasification and contaminant emissions; elemental sulfur recovery and SO{sub 2} emissions; options for carbon-dioxide recovery; syngas characteristics for combustion; CT design and combustion mechanisms; air contaminant emissions of CT; controlled CT emissions of nitrogen-oxides and carbon-monoxide gases using the SCR and oxidation catalysts, respectively; and, emission of volatile organic compounds (VOCs), and hazardous air pollutants (HAPs). However, the IGCC processes are being rigorously reviewed for the system integration and reliability, and significant reduction of air contaminant emissions (including the greenhouse gases). This paper included a review of IGCC air contaminant emission rates, and various applicable regulatory requirements, such as NSR (New Source Review), NSPS (New Source Performance Standards), and MACT (Maximum Achievable Control Technology). The IGCC facility's NOX, CO, SO{sub 2}, PM, VOCs, and HAPs emission rates would be significantly low. Thus, effective, construction and installation, and operation air permits would be necessary for IGCC facilities.

  6. Permitting plan for project W-236B, initial pretreatment module

    International Nuclear Information System (INIS)

    Tollefson, K.S.

    1995-01-01

    The Tank Waste Remediation System pretreatment process mission is to separate high-level and low-level waste fractions. A comprehensive review of environmental regulations has indicated that several environmental reviews, permits, and approvals are required before construction and operation of the facility. This revised document provides a summary of permit application data requirements, alternative strategies for permit completion and approval, as well as the probability of success for each alternative for the Initial Pretreatment Module resulting from recent revisions to the Tri-Party Agreement

  7. State waste discharge permit application 400 Area secondary cooling water. Revision 2

    International Nuclear Information System (INIS)

    1996-01-01

    This document constitutes the Washington Administrative Code 173-216 State Waste Discharge Permit Application that serves as interim compliance as required by Consent Order DE 91NM-177, for the 400 Area Secondary Cooling Water stream. As part of the Hanford Federal Facility Agreement and Consent Order negotiations, the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site that affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 of the Washington Administrative Code, the State Waste Discharge Permitting Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order DE 91NM-177. The Consent Order DE 91NM-177 requires a series of permitting activities for liquid effluent discharges. Based upon compositional and flow rate characteristics, liquid effluent streams on the Hanford Site have been categorized into Phase 1, Phase 2, and Miscellaneous streams. This document only addresses the 400 Area Secondary Cooling Water stream, which has been identified as a Phase 2 stream. The 400 Area Secondary Cooling Water stream includes contribution streams from the Fuels and Materials Examination Facility, the Maintenance and Storage Facility, the 481-A pump house, and the Fast Flux Test Facility

  8. 30 CFR 816.181 - Support facilities.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Support facilities. 816.181 Section 816.181... § 816.181 Support facilities. (a) Support facilities shall be operated in accordance with a permit... results. (b) In addition to the other provisions of this part, support facilities shall be located...

  9. 30 CFR 817.181 - Support facilities.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Support facilities. 817.181 Section 817.181... ACTIVITIES § 817.181 Support facilities. (a) Support facilities shall be operated in accordance with a permit.... (b) In addition to the other provisions of this part, support facilities shall be located, maintained...

  10. WIPP Facility Work Plan for Solid Waste Management Units

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2001-02-25

    This 2001 Facility Work Plan (FWP) has been prepared as required by Module VII, Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a), and incorporates comments from the New Mexico Environment Department (NMED) received on December 6, 2000 (NMED, 2000a). This February 2001 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. The permittees are evaluating data from previous investigations of the SWMUs and AOCs against the newest guidance proposed by the NMED. Based on these data, the permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility’s Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit.

  11. Transmission cost minimization strategies for wind-electric generating facilities

    Energy Technology Data Exchange (ETDEWEB)

    Gonzalez, R. [Northern States Power Company, Minneapolis, MN (United States)

    1997-12-31

    Integrating wind-electric generation facilities into existing power systems presents opportunities not encountered in conventional energy projects. Minimizing outlet cost requires probabilistic value-based analyses appropriately reflecting the wind facility`s operational characteristics. The wind resource`s intermittent nature permits relaxation of deterministic criteria addressing outlet configuration and capacity required relative to facility rating. Equivalent capacity ratings of wind generation facilities being a fraction of installed nameplate rating, outlet design studies contingency analyses can concentrate on this fractional value. Further, given its non-dispatchable, low capacity factor nature, a lower level of redundancy in outlet facilities is appropriate considering the trifling contribution to output unreliability. Further cost reduction opportunities arise from {open_quotes}wind speed/generator power output{close_quotes} and {open_quotes}wind speed/overhead conductor rating{close_quotes} functions` correlation. Proper analysis permits the correlation`s exploitation to safely increase line ratings. Lastly, poor correlation between output and utility load may permit use of smaller conductors, whose higher (mostly off-peak) losses are economically justifiable.

  12. Storm Water General Permit 3 for Rock and Asphalt

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — General permit #3 for storm water discharges associated with industrial activity for Asphalt Plants, Concrete Batch Plants, Rock Crushing Plants and Construction...

  13. Improving primary health care facility performance in Ghana: efficiency analysis and fiscal space implications.

    Science.gov (United States)

    Novignon, Jacob; Nonvignon, Justice

    2017-06-12

    Health centers in Ghana play an important role in health care delivery especially in deprived communities. They usually serve as the first line of service and meet basic health care needs. Unfortunately, these facilities are faced with inadequate resources. While health policy makers seek to increase resources committed to primary healthcare, it is important to understand the nature of inefficiencies that exist in these facilities. Therefore, the objectives of this study are threefold; (i) estimate efficiency among primary health facilities (health centers), (ii) examine the potential fiscal space from improved efficiency and (iii) investigate the efficiency disparities in public and private facilities. Data was from the 2015 Access Bottlenecks, Cost and Equity (ABCE) project conducted by the Institute for Health Metrics and Evaluation. The Stochastic Frontier Analysis (SFA) was used to estimate efficiency of health facilities. Efficiency scores were then used to compute potential savings from improved efficiency. Outpatient visits was used as output while number of personnel, hospital beds, expenditure on other capital items and administration were used as inputs. Disparities in efficiency between public and private facilities was estimated using the Nopo matching decomposition procedure. Average efficiency score across all health centers included in the sample was estimated to be 0.51. Also, average efficiency was estimated to be about 0.65 and 0.50 for private and public facilities, respectively. Significant disparities in efficiency were identified across the various administrative regions. With regards to potential fiscal space, we found that, on average, facilities could save about GH₵11,450.70 (US$7633.80) if efficiency was improved. We also found that fiscal space from efficiency gains varies across rural/urban as well as private/public facilities, if best practices are followed. The matching decomposition showed an efficiency gap of 0.29 between private

  14. State Waste Discharge Permit application: 200-W Powerhouse Ash Pit

    Energy Technology Data Exchange (ETDEWEB)

    Atencio, B.P.

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations; the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. This document constitutes the State Waste Discharge Permit application for the 200-W Powerhouse Ash Pit. The 200-W Powerhouse Ash Waste Water discharges to the 200-W Powerhouse Ash Pit via dedicated pipelines. The 200-W Powerhouse Ash Waste Water is the only discharge to the 200-W Powerhouse Ash Pit. The 200-W Powerhouse is a steam generation facility consisting of a coal-handling and preparation section and boilers.

  15. State Waste Discharge Permit application: 200-E Powerhouse Ash Pit

    Energy Technology Data Exchange (ETDEWEB)

    Atencio, B.P.

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations, the US Department and Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. This document constitutes the State Waste Discharge Permit application for the 200-E Powerhouse Ash Pit. The 200-E Powerhouse Ash Waste Water discharges to the 200-E Powerhouse Ash Pit via dedicated pipelines. The 200-E Ash Waste Water is the only discharge to the 200-E Powerhouse Ash Pit. The 200-E Powerhouse is a steam generation facility consisting of a coal-handling and preparation section and boilers.

  16. AQUIS: A PC-based air quality and permit information system

    International Nuclear Information System (INIS)

    Smith, A.E.; Huber, C.C.; Tschanz, J.; Ryckman, J.S. Jr.

    1992-01-01

    The Air Quality Utility Information System (AQUIS) was developed to calculate and track emissions, permits, and related information. The system runs on IBM-compatible personal computers using dBASE IV. AQUIS tracks more than 900 data items distributed among various source categories and allows the user to enter specific information on permit control devices, stacks, and related regulatory requirements. The system is currently operating at seven US Air Force Materiel Command facilities, large industrial operations involved in the repair and maintenance of aircraft. Environmental management personnel are responsible for the compliance status of as many as l,000 sources at each facility. The usefulness of the system has been enhanced by providing a flexible reporting capability that permits users who are unfamiliar with database structure to design and prepare reports containing specified information. In addition to the standard six pollutants, AQUIS calculates compound-specific emissions and allows users to enter their own emission estimates. This capability will be useful in developing air toxics inventories and control plans

  17. Innovations in emergency response plans : making the useful application of the 2007 CDA guidelines for emergency response plans

    Energy Technology Data Exchange (ETDEWEB)

    Stevenson, A.J. [Columbia Power Corp., Castlegar, BC (Canada)

    2008-07-01

    Columbia Power Corporation (CPC) changed its perspective and approach to emergency response plans (ERP) between 2002 and 2007 from one of administrative necessity to one of important functional reference. The new 2007 Canadian Dam Association Guidelines helped facilitate that transition for both CPC and all dam owners. As part of the licensing requirements for its new facility, CPC had an ERP commissioned and developed in 2002. A potential dam safety event occurred in 2004, which necessitated the need for the ERP to be put to use. However, at the time, it was found to be lacking in functionality for field personnel. As a result, CPC recognized the significance of having a functional ERP for field staff and undertook a substantial redraft between 2005 and 2007. This paper discussed the development of the ERP with particular reference to assessing the top potential emergency scenarios for the facility; development of response plans for the identified scenarios; a flow chart to guide personnel through the required actions; response checklist; detailed inspection checklists and any required forms, photos or specific information. It was concluded that the new ERP has been well received and has improved facility awareness and emergency preparedness. 1 ref., 2 figs.

  18. 77 FR 30919 - Commercial Driver's License Testing and Commercial Learner's Permit Standards

    Science.gov (United States)

    2012-05-24

    ..., and 385 [Docket No. FMCSA-2007-27659] Commercial Driver's License Testing and Commercial Learner's... published a final rule titled ``Commercial Driver's License Testing and Commercial Learner's Permit... additional drivers, primarily those transporting certain tanks temporarily attached to the commercial motor...

  19. 40 CFR 262.212 - Making the hazardous waste determination at an on-site interim status or permitted treatment...

    Science.gov (United States)

    2010-07-01

    ..., storage or disposal facility. If an eligible academic entity makes the hazardous waste determination... hazardous waste permit or interim status as soon as it arrives in the on-site treatment, storage or disposal... permitted treatment, storage or disposal facility. (e) If the unwanted material is a hazardous waste, the...

  20. Resource Conservation and Recovery Act: Part B, Permit application

    International Nuclear Information System (INIS)

    1992-03-01

    This report contains information related to the permit application for the WIPP facility. Information is presented on solid waste management; personnel safety; emergency plans; site characterization; applicable regulations; decommissioning; and ground water monitoring requirements

  1. Improved Safety and Efficiency of Protected/Permitted Right-Turns in Oregon

    Science.gov (United States)

    2018-05-01

    This research aimed to develop an understanding of the safety and operational implications of using the flashing yellow arrow (FYA) in permitted and protected/permitted right turn (PPRT) operations to maximize safety and efficiency. This report inclu...

  2. BCDC Minor Permits

    Data.gov (United States)

    California Natural Resource Agency — An administrative permit can be issued for an activity that qualifies as a minor repair or improvement in a relatively short period of time and without a public...

  3. Facility status and progress of the INEL's WERF MLLW and LLW incinerator

    International Nuclear Information System (INIS)

    Conley, D.; Corrigan, S.

    1996-01-01

    The Idaho National Engineering Laboratory's (INEL) Waste Experimental Reduction Facility (WERF) incinerator began processing beta/gamma- emitting low-level waste (LLW) in September 1984. A Resource Conservation and Recovery Act (RCRA) trial burn for the WERF incinerator was conducted in 1986, and in 1989 WERF began processing (hazardous and low-level radioactive) waste known as mixed low-level waste (MLLW). On February 14, 1991 WERF operations were suspended to improve operating procedures and configuration management. On July 12, 1995, WERF initiated incineration of LLW; and on September 20, 1995 WERF resumed its primary mission of incinerating MLLW. MLLW incineration is proceeding under RCRA interim status. State of Idaho issuance of the Part B permit is one of the State's highest permitting priorities. The State of Idaho's Division of Environmental Quality is reviewing the permit application along with a revised trial burn plan that was also submitted with the application. The trial burn has been proposed to be performed in 1996 to demonstrate compliance with the current incinerator guidance. This paper describes the experiences and problems associated with WERF's operations, incineration of MLLW, and the RCRA Part B Permit Application. Some of the challenges that have been overcome include waste characterization, waste repackaging, repackaged waste storage, and implementation of RCRA interim status requirements. A number of challenges remain. They include revision of the RCRA Part B Permit Application and the Trial Burn Plan in response to comments from the state permit application reviewers as well as facility and equipment upgrades required to meet RCRA Permitted Status

  4. 77 FR 25082 - Picture Permit Imprint Indicia

    Science.gov (United States)

    2012-04-27

    ... POSTAL SERVICE 39 CFR Part 111 Picture Permit Imprint Indicia AGENCY: Postal Service\\TM\\. ACTION... Service, Domestic Mail Manual (DMM[supreg]) 604.5 to add picture permit imprint indicia standards allowing...: The use of picture permit imprint indicia is designed to improve the effectiveness of a mailpiece by...

  5. 30 CFR 780.38 - Support facilities.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Support facilities. 780.38 Section 780.38... Support facilities. Each applicant for a surface coal mining and reclamation permit shall submit a description, plans, and drawings for each support facility to be constructed, used, or maintained within the...

  6. 30 CFR 784.30 - Support facilities.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Support facilities. 784.30 Section 784.30... Support facilities. Each applicant for an underground coal mining and reclamation permit shall submit a description, plans, and drawings for each support facility to be constructed, used, or maintained within the...

  7. Factors Affecting Slot Machine Performance in an Electronic Gaming Machine Facility

    OpenAIRE

    Etienne Provencal; David L. St-Pierre

    2017-01-01

    A facility exploiting only electronic gambling machines (EGMs) opened in 2007 in Quebec City, Canada under the name of Salons de Jeux du Québec (SdjQ). This facility is one of the first worldwide to rely on that business model. This paper models the performance of such EGMs. The interest from a managerial point of view is to identify the variables that can be controlled or influenced so that a comprehensive model can help improve the overall performance of the business. The EGM individual per...

  8. Prevention of significant deterioration permit application for the Fueled Clad Fabrication System, the Radioisotope Power Systems Facility, and the Fuel Assembly Area

    Energy Technology Data Exchange (ETDEWEB)

    1989-08-01

    This New Source Review'' has been submitted by the US Department of Energy-Richland Operations Office (PO Box 550, Richland, Washington 99352), pursuant to WAC 173-403-050 and in compliance with the Department of Ecology Guide to Processing A Prevention Of Significant Deterioration (PSD) Permit'' for three new sources of radionuclide emissions at the Hanford Site in Washington State. The three new sources, the Fueled Clad Fabrication System (FCFS), the Radioisotope Power Systems Facility (RPSF), and the Fuel Assembly Area (FAA), will be located in one facility, the Fuels and Materials Examination Facility (FMEF) of the 400 Area. The FMEF was originally designed to provide for post-irradiation examination and fabrication of breeder reactor fuels. These FMEF missions were cancelled before the introduction of any fuel materials or any irradiated material. The current plans are to use the facility to fabricate power supplies for use in space applications and to produce Fast Flux Test Facility (FFTF) fuel and target assemblies. The FCFS and the RPSF will produce materials and assemblies for application in space. The FAA project will produce FFTF fuel and target assemblies. The FCFS and the RPSF will share the same building, stack, and, in certain cases, the same floor space. Given this relationship, these systems will be dealt with separately to the extent possible. The FAA is a comparatively independent operation though it will share the FMEF complex.

  9. P.L. 110-140, "Energy Independence and Security Act of 2007", 2007

    Energy Technology Data Exchange (ETDEWEB)

    None

    2007-12-19

    The Energy Independence and Security Act of 2007 (EISA), signed into law on December 19, 2007, set forth an agenda for improving U.S. energy security across the entire economy. While industrial energy efficiency is specifically called out in Title IV, Subtitle D, other EISA provisions also apply to AMO activities.

  10. Grout treatment facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1992-07-01

    The Grout Treatment Facility (GTF) will provide permanent disposal for approximately 43 Mgal of radioactive liquid waste currently being stored in underground tanks on the Hanford Site. The first step in permanent disposal is accomplished by solidifying the liquid waste with cementitious dry materials. The resulting grout is cast within underground vaults. This report on the GTF contains information on the following: Vault design, run-on/run-off control design, and asphalt compatibility with 90-degree celsius double-shell slurry feed

  11. Practices And Opinions On In-Center Food Consumption Across 1,223 Facilities In The United States

    Directory of Open Access Journals (Sweden)

    Deborah Benner

    2012-06-01

    The top reasons for facility practices that allowed eating during dialysis were: prevention of hypoglycemia on dialysis, improved kcal intake on dialysis days, and the opportunity to provide counseling on food products currently chosen by the patient. The top reasons for facility practices not permitting eating during dialysis included: potential adverse events associated with hypotension, GI symptoms, choking, infection, pest control, and spills. Further analyses are warranted to determine whether there is a correlation between allowing patients to eat during dialysis treatment and an improvement in the nutritional status of the patients.

  12. WIPP Facility Work Plan for Solid Waste Management Units

    International Nuclear Information System (INIS)

    2000-01-01

    This Facility Work Plan (FWP) has been prepared as required by Module VII,Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a). This work plan describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current New Mexico Environment Department (NMED) guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility's's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The scope of work for the RFI Work Plan or SAP is being developed by the Permittees. The final content of the RFI Work Plan or SAP will be coordinated with the NMED for submittal on May 24, 2000. Specific project-related planning information will be included in the RFI Work Plan or SAP. The SWMU program at WIPP began in 1994 under U.S. Environmental Protection Agency (EPA) regulatory authority. NMED subsequently received regulatory authority from EPA. A

  13. 78 FR 17875 - Commercial Driver's License Testing and Commercial Learner's Permit Standards

    Science.gov (United States)

    2013-03-25

    ... [Docket No. FMCSA-2007-27659] RIN 2126-AB59 Commercial Driver's License Testing and Commercial Learner's.... The 2011 final rule amended the commercial driver's license (CDL) knowledge and skills testing standards and established new minimum Federal standards for States to issue the commercial learner's permit...

  14. Facilities improvement for sustainability of existing public office ...

    African Journals Online (AJOL)

    The study examined the building design features of a cosmopolitan public office building in Abuja. The features were classified into Spatial Plan, Structure and Facilities, to determine which of the 3 variables requires urgent sustainable improvement from end-users' perspective in existing public office buildings in developing ...

  15. 7 CFR 3015.16 - Construction and facility improvement.

    Science.gov (United States)

    2010-01-01

    ... subgrant. (b) Bids and contracts or subcontracts of $100,000 or less. Unless otherwise required by law, the... payment bonds. (c) Bids and contracts or subcontracts exceeding $100,000. Unless otherwise required by law... § 3015.16 Construction and facility improvement. (a) Scope. This section covers requirements for bid...

  16. Task technical plan: DWPF air permit/dispersion modeling

    International Nuclear Information System (INIS)

    Lambert, D.P.

    1993-01-01

    This Task Technical Plan summarizes work required to project the benzene emissions from the Late Wash Facility (LWF) as well as update the benzene, mercury, and NO x emissions from the remainder of the Defense Waste Processing Facility (DWPF). These calculations will reflect (1) the addition of the LWF and (2) the replacement of formic acid with nitric acid in the melter preparation process. The completed calculations will be used to assist DWPF in applying for the LWF Air Quality Permit

  17. Improving Quality of Care in Primary Health-Care Facilities in Rural Nigeria: Successes and Challenges.

    Science.gov (United States)

    Ugo, Okoli; Ezinne, Eze-Ajoku; Modupe, Oludipe; Nicole, Spieker; Winifred, Ekezie; Kelechi, Ohiri

    2016-01-01

    Nigeria has a high population density but a weak health-care system. To improve the quality of care, 3 organizations carried out a quality improvement pilot intervention at the primary health-care level in selected rural areas. To assess the change in quality of care in primary health-care facilities in rural Nigeria following the provision of technical governance support and to document the successes and challenges encountered. A total of 6 states were selected across the 6 geopolitical zones of the country. However, assessments were carried out in 40 facilities in only 5 states. Selection was based on location, coverage, and minimum services offered. The facilities were divided randomly into 2 groups. The treatment group received quality-of-care assessment, continuous feedback, and improvement support, whereas the control group received quality assessment and no other support. Data were collected using the SafeCare Healthcare Standards and managed on the SafeCare Data Management System-AfriDB. Eight core areas were assessed at baseline and end line, and compliance to quality health-care standards was compared. Outcomes from 40 facilities were accepted and analyzed. Overall scores increased in the treatment facilities compared to the control facilities, with strong evidence of improvement ( t = 5.28, P = .0004) and 11% average improvement, but no clear pattern of improvement emerged in the control group. The study demonstrated governance support and active community involvement offered potential for quality improvement in primary health-care facilities.

  18. Trends in Vitamin A, C, D, E, K Supplement Prescriptions From Military Treatment Facilities: 2007 to 2011.

    Science.gov (United States)

    Morioka, Travis Y; Bolin, Jeremy T; Attipoe, Selasi; Jones, Donnamaria R; Stephens, Mark B; Deuster, Patricia A

    2015-07-01

    Although prior studies have examined the prevalence of dietary supplement use among various populations, data on single vitamins prescribed by health care providers are limited. This study examined trends in single-vitamin supplement (A, C, D, E, K) prescriptions by providers from military treatment facilities from 2007 to 2011. We examined prescription data from the Department of Defense Pharmacy Data Transaction Service to determine trends in the aforementioned single-vitamin supplement prescriptions. Prescription rates per 1,000 active duty personnel were estimated using population data retrieved from the Defense Medical Epidemiology Database (i.e., [number of prescriptions/population size] × 1,000). Across the 5-year period, the number of vitamin D prescriptions per 1,000 active duty personnel increased 454%. In contrast, the number of vitamin A, vitamin E, and vitamin K prescriptions per 1,000 active duty personnel decreased by 32%, 53%, and 29% respectively. Vitamin C prescriptions remained relatively constant. Across all age groups, total single-vitamin supplement prescriptions increased by 180%. Together, prescriptions examined in this study increased steadily from 2007 to 2011, primarily because of the increase in vitamin D prescriptions. The exhibited trend reflects the current general-population pattern of dietary supplement use, with large increases in vitamin D and declines in vitamin E. Reprint & Copyright © 2015 Association of Military Surgeons of the U.S.

  19. Resource conversation and recovery act (RCRA) Contingency Plan for interim status or permitted units at the Oak Ridge Y-12 Plant

    International Nuclear Information System (INIS)

    1992-08-01

    The official mission of the Y-12 Plant is to serve as a manufacturing technology center for key processes such that capabilities are maintained for safe, secure, reliable, and survivable nuclear weapons systems and other applications of national importance. The Y-12 RCRA Contingency Plan will be reviewed and revised if necessary if the facility RCRA operating permits are revised, the plan is inadequate in an emergency, the procedures herein can be improved, the facility's operations change in a manner that alters the plan, the emergency coordinator changes, or the emergency equipment list changes. Copies of the Y-12 Emergency Management Plan are available at the Plant Shift Superintendent's Office and the Emergency Preparedness Office. This document serves to supplement the Y-12 Emergency Management Plan to be appropriate for all RCRA hazardous waste interim status or permitted treatment, storage, or disposal facilities. The 90-day storage areas at the Y-12 Plant have a separate contingency supplement as required by RCRA and are separate from this supplement

  20. Present Situation and Problems of Land Improvement District as an Operation and Maintenance Organization of Land Improvement Facilities

    OpenAIRE

    長堀, 金造; 赤江, 剛夫; 大田, 征六

    1994-01-01

    Land improvement districts originally started as organizations after World War II: They are in charge of construction and operation of irrigation and drainage facilities, Development of agricultural land, reclamation from sea water, reclamation by filling, Recovery from disaster, exchange and consolidation of agricultural land and so on. As the Main construction projects were completed, the purpose of land improvement districts Has shifted from facilities construction to operation and mainten...

  1. [Changes in CIRUGIA ESPANOLA Letters to the Editor between 2000 and 2007].

    Science.gov (United States)

    Rosell-Pradas, Jorge; Sánchez-Cantalejo, Emilio

    2008-09-01

    To describe the frequency and bibliographic characteristics of letters to the editor in the journal, Cirugía Española published between 2000 and 2007 and to compare the differences in the periods between 2000-2003 and 2004-2007. A descriptive and cross-sectional study, using the letters to the editor published in Spanish surgery between 2000 and 2007, as observation units. The variables considered were: the number of letters according to the volume and year of publication, substantive content of the paper, text length, graphics resources use, number of signatories and their professional profile, institutions of the authors, by origin and number of Autonomous Communities and number of bibliographical references. To meet the second objective, we compared letters from the period 2000-2003 with the period 2004-2007 against the rest of variables considered as a result. We used descriptive statistics and statistical analysis for comparison of distributions (chi2), with a level of significance of p < 0.05, using the SPSS software (Version 15.0). We identified 312 documents classified as letters. Between 2002 and 2005 their number was small. Often referring to clinical cases 187 (59.9%) and related letters, 98 (31.4%). Of those, 81.1% met the standard length of the text and only 6 letters (1.9%) was the use of graphics exceeded. In 122 letters (39.1%) the permitted number of authors was exceeded. They were mostly contributed by surgeons, 238 cases (76.3%), usually a single hospital, with 294 letters (94.2%) mainly from, Catalonia, Andalusia, Madrid and Valencia. Only 58.1% of the letters complied with the permitted number of references. More related letters were published in the last period (59 letters; 42.1%) than during the years 2000-2003 (39 letters; 22.7%) (chi2 = 14.79; p < 0.001). The correct length of the text improved in the second period, 136 (97.1%), compared to the first 117 (68%) (chi2 = 42.67; p < 0.001. The graphics resources were used properly in both

  2. Implementing RCRA during facility deactivation

    International Nuclear Information System (INIS)

    Lebaron, G.J.

    1997-01-01

    RCRA regulations require closure of permitted treatment, storage and disposal (TSD) facilities within 180 days after cessation of operations, and this may essentially necessitate decommissioning to complete closure. A more cost effective way to handle the facility would be to significantly reduce the risk to human health and the environment by taking it from its operational status to a passive, safe, inexpensive-to-maintain surveillance and maintenance condition (deactivation) prior to decommissioning. This paper presents an innovative approach to the cost effective deactivation of a large, complex chemical processing facility permitted under RCRA. The approach takes into account risks to the environment posed by this facility in comparison to risks posed by neighboring facilities at the site. The paper addresses the manner in which: 1) stakeholders and regulators were involved; 2) identifies a process by which the project proceeds and regulators and stakeholders were involved; 3) end points were developed so completion of deactivation was clearly identified at the beginning of the project, and 4) innovative practices were used to deactivate more quickly and cost effectively

  3. 40 CFR 266.102 - Permit standards for burners.

    Science.gov (United States)

    2010-07-01

    ... or industrial furnace downstream of the combustion zone and prior to release of stack gases to the... MANAGEMENT FACILITIES Hazardous Waste Burned in Boilers and Industrial Furnaces § 266.102 Permit standards for burners. (a) Applicability—(1) General. Owners and operators of boilers and industrial furnaces...

  4. Improvements in access to malaria treatment in Tanzania following community, retail sector and health facility interventions -- a user perspective

    Directory of Open Access Journals (Sweden)

    Obrist Brigit

    2010-06-01

    Full Text Available Abstract Background The ACCESS programme aims at understanding and improving access to prompt and effective malaria treatment. Between 2004 and 2008 the programme implemented a social marketing campaign for improved treatment-seeking. To improve access to treatment in the private retail sector a new class of outlets known as accredited drug dispensing outlets (ADDO was created in Tanzania in 2006. Tanzania changed its first-line treatment for malaria from sulphadoxine-pyrimethamine (SP to artemether-lumefantrine (ALu in 2007 and subsidized ALu was made available in both health facilities and ADDOs. The effect of these interventions on understanding and treatment of malaria was studied in rural Tanzania. The data also enabled an investigation of the determinants of access to treatment. Methods Three treatment-seeking surveys were conducted in 2004, 2006 and 2008 in the rural areas of the Ifakara demographic surveillance system (DSS and in Ifakara town. Each survey included approximately 150 people who had suffered a fever case in the previous 14 days. Results Treatment-seeking and awareness of malaria was already high at baseline, but various improvements were seen between 2004 and 2008, namely: better understanding causes of malaria (from 62% to 84%; an increase in health facility attendance as first treatment option for patients older than five years (27% to 52%; higher treatment coverage with anti-malarials (86% to 96% and more timely use of anti-malarials (80% to 93-97% treatments taken within 24 hrs. Unfortunately, the change of treatment policy led to a low availability of ALu in the private sector and, therefore, to a drop in the proportion of patients taking a recommended malaria treatment (85% to 53%. The availability of outlets (health facilities or drug shops is the most important determinant of whether patients receive prompt and effective treatment, whereas affordability and accessibility contribute to a lesser extent. Conclusions An

  5. Improving heart failure disease management in skilled nursing facilities: lessons learned.

    Science.gov (United States)

    Dolansky, Mary A; Hitch, Jeanne A; Piña, Ileana L; Boxer, Rebecca S

    2013-11-01

    The purpose of the study was to design and evaluate an improvement project that implemented HF management in four skilled nursing facilities (SNFs). Kotter's Change Management principles were used to guide the implementation. In addition, half of the facilities had an implementation coach who met with facility staff weekly for 4 months and monthly for 5 months. Weekly and monthly audits were performed that documented compliance with eight key aspects of the protocol. Contextual factors were captured using field notes. Adherence to the HF management protocols was variable ranging from 17% to 82%. Facilitators of implementation included staff who championed the project, an implementation coach, and physician involvement. Barriers were high staff turnover and a hierarchal culture. Opportunities exist to integrate HF management protocols to improve SNF care.

  6. Information bulletin of the bureau of hydrocarbons exploration-production (BEPH) - Annual status 2007

    International Nuclear Information System (INIS)

    2008-01-01

    This special issue of the BEPH newsletter presents the main results of the hydrocarbons research and production activity in France during the year 2007: evolution of the mining domain (demands, allocations and extension of research permits and concessions, demands under instruction, evolution of permits surfaces), investments in seismic surveys and drilling activity (new drillings, completed drillings); investments in fields exploitation; production by field and by operator (crude oil, commercialized gas). (J.S.)

  7. Resource Conservation and Recovery Act, Part B permit application

    International Nuclear Information System (INIS)

    1993-01-01

    This volume includes the following chapters: Waste Isolation Pilot Plant RCRA A permit application; facility description; waste analysis plan; groundwater monitoring; procedures to prevent hazards; RCRA contingency plan; personnel training; corrective action for solid waste management units; and other Federal laws

  8. PUREX facility preclosure work plan

    International Nuclear Information System (INIS)

    Engelmann, R.H.

    1997-01-01

    This preclosure work plan presents a description of the PUREX Facility, the history of the waste managed, and addresses transition phase activities that position the PUREX Facility into a safe and environmentally secure configuration. For purposes of this documentation, the PUREX Facility does not include the PUREX Storage Tunnels (DOE/RL-90/24). Information concerning solid waste management units is discussed in the Hanford Facility Dangerous Waste Permit Application, General Information Portion (DOE/RL-91-28, Appendix 2D)

  9. NPDES Permit for Super Concrete Ready-Mix Corp. (Aggregate Industries)

    Science.gov (United States)

    Under National Pollutant Discharge Elimination System permit number DC0000175, Super Concrete Ready-Mix Corporation is authorized to discharge from a facility to receiving waters named unnamed tributary to Northwest Branch of the Anacostia River.

  10. Improvements of present radioactive beam facilities and new projects

    International Nuclear Information System (INIS)

    Mueller, A.C.

    1995-01-01

    A short overview is given over scheduled improvements of present radioactive beam facilities and of new projects. In order to put these into a coherent context the paper starts with a general section about the making of radioactive beams. (author)

  11. Association Between Treatment at High-Volume Facilities and Improved Overall Survival in Soft Tissue Sarcomas.

    Science.gov (United States)

    Venigalla, Sriram; Nead, Kevin T; Sebro, Ronnie; Guttmann, David M; Sharma, Sonam; Simone, Charles B; Levin, William P; Wilson, Robert J; Weber, Kristy L; Shabason, Jacob E

    2018-03-15

    Soft tissue sarcomas (STS) are rare malignancies that require complex multidisciplinary management. Therefore, facilities with high sarcoma case volume may demonstrate superior outcomes. We hypothesized that STS treatment at high-volume (HV) facilities would be associated with improved overall survival (OS). Patients aged ≥18 years with nonmetastatic STS treated with surgery and radiation therapy at a single facility from 2004 through 2013 were identified from the National Cancer Database. Facilities were dichotomized into HV and low-volume (LV) cohorts based on total case volume over the study period. OS was assessed using multivariable Cox regression with propensity score-matching. Patterns of care were assessed using multivariable logistic regression analysis. Of 9025 total patients, 1578 (17%) and 7447 (83%) were treated at HV and LV facilities, respectively. On multivariable analysis, high educational attainment, larger tumor size, higher grade, and negative surgical margins were statistically significantly associated with treatment at HV facilities; conversely, black race and non-metropolitan residence were negative predictors of treatment at HV facilities. On propensity score-matched multivariable analysis, treatment at HV facilities versus LV facilities was associated with improved OS (hazard ratio, 0.87, 95% confidence interval, 0.80-0.95; P = .001). Older age, lack of insurance, greater comorbidity, larger tumor size, higher tumor grade, and positive surgical margins were associated with statistically significantly worse OS. In this observational cohort study using the National Cancer Database, receipt of surgery and radiation therapy at HV facilities was associated with improved OS in patients with STS. Potential sociodemographic disparities limit access to care at HV facilities for certain populations. Our findings highlight the importance of receipt of care at HV facilities for patients with STS and warrant further study into improving access to

  12. Permitting plan for Project W-340, Tank 241-C-106 manipulator retrieval arm

    International Nuclear Information System (INIS)

    Tollefson, K.S.

    1995-01-01

    This document describes the regulatory requirements and describes alternative strategies for obtaining permits and approvals for Project W-340, Tank 241-C-106 Manipulator Retrieval Arm. A comprehensive review of environmental regulations has indicated that several environmental reviews, permits, and approvals are required before design, construction, and operation of the facility. The environmental reviews, permits, and approvals, as well the regulatory authority potentially applicable to the Project W-340 Long Reach Manipulator Arm include the following: National Environmental Policy Act of 1969 -- US Department of Energy, Headquarters; State Environmental Policy Act of 1971 -- State of Washington Department of Ecology; Air Permitting; Dangerous Waste Permitting; Miscellaneous Reviews/Permits/Approvals. This document describes the environmental reviews, permits, and approval requirements for the project. It provides a summary of permit application data requirements, alternative strategies for permit completion and approval, as well as the estimated probability of success for each alternative strategy

  13. Horonobe Underground Research Laboratory project investigation program for the 2007 fiscal year (Translated document)

    International Nuclear Information System (INIS)

    Matsui, Hiroya; Nakayama, Masashi; Sanada, Hiroyuki; Yamaguchi, Takehiro

    2008-09-01

    As past of the research and development program on the geological disposal of high-level radioactive waste (HLW), the Horonobe Underground Research Center, a division of the Japan Atomic Energy Agency (JAEA), is implementing the Horonobe Underground Research Laboratory Project (Horonobe URL Project) with the aim at investigating sedimentary rock formations. According to the research plan described in the Midterm Plan of JAEA, geological investigations are to be carried out during the drilling of a shaft down to intermediate depth, while research and development in the areas of engineering technology and safety assessment are to be promoted by collaboration with other research organizations. The results of the R and D activities will be systematized as a 'knowledge base' that supports a wide range of arguments related to the safety of geological disposal. The Horonobe URL Project is planned to extend over a period of 20 years. The investigations will be conducted in three phases, namely 'Phase 1: Surface-based investigations', 'Phase 2: Construction phase' (investigations during construction of the underground facilities) and 'Phase 3: Operation phase' (research in the underground facilities). This report summarizes the investigation program for the 2007 fiscal year (2007/2008), the third year of the Phase 2 investigations. In the 2007 fiscal year, investigations in geoscientific research', including 'development of techniques for investigating the geological environment', 'development of techniques for use in the deep underground environment' and 'studies on the long-term stability of the geological environment', is continuously carried out. Investigations in 'research and development on geological disposal technology', including improving the reliability of disposal technologies' and 'enhancement of safety assessment methodologies' are also continuously carried out. Construction of the underground facilities is ongoing at the Ventilation Shaft and the East Shaft

  14. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2007

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Environmental Services LLC (WVES) and URS - Washington Division

    2008-12-17

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2007. The report summarizes the calendar year (CY) 2007 environmental protection program at the WVDP. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment.

  15. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2007

    International Nuclear Information System (INIS)

    2008-01-01

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2007. The report summarizes the calendar year (CY) 2007 environmental protection program at the WVDP. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment

  16. Evaluation of the improvement suggestion system in a nuclear facility

    International Nuclear Information System (INIS)

    Carnaval, Joao Paulo Rodrigues; Moraes, Geice Almeida

    2017-01-01

    This work evaluated methods for processing improvement suggestions of a nuclear factory, with the intention to verify those which best fits to the company purposes. Two methods for processing improvement suggestions were applied in the studied organization. The first one was guided to the processing suggestions by specific independent sectors of the company and the second one was conducted to the processing of suggestions by a multidisciplinary team. It has been concluded that a multidisciplinary team focused on research and development would be the best option to the implementation of improvement suggestions and technological innovation on this facility, instead of multi sector processing which revealed to be excessive bureaucratic before the expected goals. This study can be used by nuclear facilities to optimize an existing system of improvements analysis or even guide them for the implantation of a new one. It is more significant for the companies certified on ISO and OHSAS standards for the quality management, environmental and safety and occupational health systems which requires that the continuous improvement must exist and to be demonstrated. But it is also relevant for nuclear plants aiming to implement an Integrated Management System certified on ISO Standards. (author)

  17. Evaluation of the improvement suggestion system in a nuclear facility

    Energy Technology Data Exchange (ETDEWEB)

    Carnaval, Joao Paulo Rodrigues; Moraes, Geice Almeida, E-mail: joaocarnaval@inb.gov.br, E-mail: geice@inb.gov.br [Industrias Nucleares do Brasil S.A (INB), Resende, RJ (Brazil)

    2017-11-01

    This work evaluated methods for processing improvement suggestions of a nuclear factory, with the intention to verify those which best fits to the company purposes. Two methods for processing improvement suggestions were applied in the studied organization. The first one was guided to the processing suggestions by specific independent sectors of the company and the second one was conducted to the processing of suggestions by a multidisciplinary team. It has been concluded that a multidisciplinary team focused on research and development would be the best option to the implementation of improvement suggestions and technological innovation on this facility, instead of multi sector processing which revealed to be excessive bureaucratic before the expected goals. This study can be used by nuclear facilities to optimize an existing system of improvements analysis or even guide them for the implantation of a new one. It is more significant for the companies certified on ISO and OHSAS standards for the quality management, environmental and safety and occupational health systems which requires that the continuous improvement must exist and to be demonstrated. But it is also relevant for nuclear plants aiming to implement an Integrated Management System certified on ISO Standards. (author)

  18. WIPP Facility Work Plan for Solid Waste Management Units and Areas of Concern

    International Nuclear Information System (INIS)

    2001-01-01

    This 2001 Facility Work Plan (FWP) has been prepared as required by Module VII, Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a), and incorporates comments from the New Mexico Environment Department (NMED) received on December 6, 2000 (NMED, 2000a). This February 2001 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. The permittees are evaluating data from previous investigations of the SWMUs and AOCs against the newest guidance proposed by the NMED. Based on these data, the permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit.

  19. 78 FR 69433 - Executive Order 13650 Improving Chemical Facility Safety and Security Listening Sessions

    Science.gov (United States)

    2013-11-19

    ... Chemical Facility Safety and Security Listening Sessions AGENCY: National Protection and Programs... from stakeholders on issues pertaining to Improving Chemical Facility Safety and Security (Executive... regulations, guidance, and policies; and identifying best practices in chemical facility safety and security...

  20. Improvement of Safety Assessment Methodologies for Near Surface Disposal Facilities

    International Nuclear Information System (INIS)

    Batandjieva, B.; Torres-Vidal, C.

    2002-01-01

    The International Atomic Energy Agency (IAEA) Coordinated research program ''Improvement of Safety Assessment Methodologies for Near Surface Disposal Facilities'' (ISAM) has developed improved safety assessment methodology for near surface disposal facilities. The program has been underway for three years and has included around 75 active participants from 40 countries. It has also provided examples for application to three safety cases--vault, Radon type and borehole radioactive waste disposal facilities. The program has served as an excellent forum for exchange of information and good practices on safety assessment approaches and methodologies used worldwide. It also provided an opportunity for reaching broad consensus on the safety assessment methodologies to be applied to near surface low and intermediate level waste repositories. The methodology has found widespread acceptance and the need for its application on real waste disposal facilities has been clearly identified. The ISAM was finalized by the end of 2000, working material documents are available and an IAEA report will be published in 2002 summarizing the work performed during the three years of the program. The outcome of the ISAM program provides a sound basis for moving forward to a new IAEA program, which will focus on practical application of the safety assessment methodologies to different purposes, such as licensing radioactive waste repositories, development of design concepts, upgrading existing facilities, reassessment of operating repositories, etc. The new program will also provide an opportunity for development of guidance on application of the methodology that will be of assistance to both safety assessors and regulators

  1. 77 FR 38051 - EPA Activities To Promote Environmental Justice in the Permit Application Process

    Science.gov (United States)

    2012-06-26

    ... community. In addition to their important role as a source of employment and economic stability within a... economic stability within a community, facilities play other roles. Many facilities, for example, have... sustainability, stability and--ultimately--profitability. Early and meaningful dialogue between the permit...

  2. 77 FR 69769 - Solid Waste Rail Transfer Facilities

    Science.gov (United States)

    2012-11-21

    ...] Solid Waste Rail Transfer Facilities AGENCY: Surface Transportation Board, DOT. ACTION: Final rules. SUMMARY: These final rules govern land-use-exemption permits for solid waste rail transfer facilities. The... Transportation Board over solid waste rail transfer facilities. The Act also added three new statutory provisions...

  3. NPDES Draft Permit for Spirit Lake Water Treatment Facility in North Dakota

    Science.gov (United States)

    Under NPDES draft permit ND-0031101, Spirit Lake Water Resource Management is authorized to discharge to an unnamed intermittent tributary to Devils Lake which is tributary to Sheyenne River in North Dakota.

  4. Liquid Effluent Retention Facility

    Data.gov (United States)

    Federal Laboratory Consortium — The Liquid Effluent Retention Facility (LERF) is located in the central part of the Hanford Site. LERF is permitted by the State of Washington and has three liquid...

  5. NPDES Permit for Crow Nation Water Treatment Plants in Montana

    Science.gov (United States)

    Under NPDES permit MT-0030538, the U.S. Bureau of Indian Affairs is authorized to discharge from the Crow Agency water treatment plants via the wastewater treatment facility located in Bighorn County, Montana to the Little Bighorn River.

  6. WIPP Facility Work Plan for Solid Waste Management Units and Areas of Concern

    International Nuclear Information System (INIS)

    2002-01-01

    This 2002 Facility Work Plan (FWP) has been prepared as required by Module VII, Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received on December 6, 2000 (NMED, 2000a). This February 2002 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the most recent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA processcan be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable

  7. Resource Conservation and Recovery Act, Part B, Permit Application

    International Nuclear Information System (INIS)

    1991-01-01

    This report is part of the permit application for the WIPP facility. Appendices are presented on the following: the design validation final report; sampling of volatile organic compounds which may be emitted from waste binss, site supplementary roof support system, and studies on wind and tornado probabilities

  8. An improved safeguards system and its application to large backend facilities

    International Nuclear Information System (INIS)

    1978-12-01

    The evaluation criteria, which are commonly applicable to both Material Accountancy (MA) and Containment and Surveillance (C/S) and applicable to a large backend facilities, are discussed. It is analyzed that substantial increase of the proliferation resistance can be expected by improving the presently existing safeguards systems. The improved safeguards system described in this paper is expected to be applicable to large-scaled backend facilities without giving unnecessary economical and technical burdens. The main purpose of this approach is to move away from the present trend of too much reliance on MA and to develop the synthetical safeguards effects by harmonizing C/S and continuing MA effectively

  9. 76 FR 39018 - Commercial Driver's License Testing and Commercial Learner's Permit Standards; Corrections

    Science.gov (United States)

    2011-07-05

    ... [Docket No. FMCSA-2007-27659] RIN 2126-AB02 Commercial Driver's License Testing and Commercial Learner's..., 2011, that will be effective on July 8, 2011. This final rule amends the commercial driver's license... to issue the commercial learner's permit (CLP). Since the final rule was published, FMCSA identified...

  10. Potential reuse of petroleum-contaminated soil: A directory of permitted recycling facilities

    International Nuclear Information System (INIS)

    Rosenthal, S.; Wolf, G.; Avery, M.; Nash, J.H.

    1992-06-01

    Soil contaminated by virgin petroleum products leaking from underground storage tanks is a pervasive problem in the United States. Economically feasible disposal of such soil concerns the responsible party (RP), whether the RP is one individual small business owner, a group of owners, or a large multinational corporation. They may need a starting point in their search for an appropriate solution, such as recycling. The report provides initial assistance in two important areas. First it discusses four potential recycling technologies that manufacture marketable products from recycled petroleum-contaminated soil: the hot mix asphalt process, the cold mix asphalt system, cement production, and brick manufacturing. The report also presents the results of a project survey designed to identify recycling facilities. It lists recycling facilities alphabetically by location within each state, organized by U.S. Environmental Protection Agency (EPA) Region. The report also includes detailed addresses, recycling locations, telephone numbers, and contacts for these facilities. The scope of the project limits listings to fixed facilities or small mobile facility owners that recycle soil contaminated by virgin petroleum products into marketable commodities. It does not address site-specific or commercial hazardous waste remediation facilities

  11. Centrifuge Facility for the International Space Station Alpha

    Science.gov (United States)

    Johnson, Catherine C.; Hargens, Alan R.

    1994-01-01

    The Centrifuge Facility planned for the International Space Station Alpha has under-one considerable redesign over the past year, primarily because the Station is now viewed as a 10 year mission rather than a 30 year mission and because of the need to simply the design to meet budget constraints and a 2000 launch date. The basic elements of the Centrifuge Facility remain the same, i.e., a 2.5 m diameter centrifuge, a micro-g holding unit, plant and animal habitats, a glovebox and a service unit. The centrifuge will still provide the full range of artificial gravity from 0.01 a to 2 - as originally planned; however, the extractor to permit withdrawal of habitats from the centrifuge without stopping the centrifuge has been eliminated. The specimen habitats have also been simplified and are derived from other NASA programs. The Plant Research Unit being developed by the Gravitational Biology Facility will be used to house plants in the Centrifuge Facility. Although not as ambitious as the Centrifuge Facility plant habitat, it will provide much better environmental control and lighting than the current Shuttle based Plant Growth Facility. Similarly, rodents will be housed in the Advanced Animal Habitat being developed for the Shuttle program. The Centrifuge Facility and ISSA will provide the opportunity to perform repeatable, high quality science. The long duration increments available on the Station will permit multigeneration studies on both plants and animals which have not previously been possible. The Centrifuge Facility will accommodate sufficient number of specimens to permit statistically significant sampling of specimens to investigate the time course of adaptation to altered gravity environments. The centrifuge will for the first time permit investigators to use gravity itself as a tool to investigate fundamental processes, to investigate the intensity and duration of gravity to maintain normal structure and function, to separate the effects of micro-g from

  12. NPDES Permit for Mesa Verde National Park Wastewater Treatment Facility in Colorado

    Science.gov (United States)

    Under NPDES permit number CO-0034398, the United States Department of the Interior, National Park Service, Mesa Verde National Park is authorized to discharge from the Mesa Verde National Park wastewater treatment plant, in Montezuma County, Colo.

  13. Investigations on detection sensitivity of the NRTA method for different size representing facilities. Pt. 1 and 2

    International Nuclear Information System (INIS)

    Gupta, D.; Bicking, U.; Koutsouvelis, G.

    1985-12-01

    The capability and limitations of the NRTA method (Near-Real-Time Accountancy method) in reprocessing facilities with different throughputs and inventories and measurement uncertainties, were investigated with a detailed computer simulated data base. These investigations have confirmed the earlier findings that the NRTA method could permit under certain operating conditions and for a number of realistic diversion scenarios, a perceptible improvement in the detection capability. Depending on the conditions prevailing, such improvements could be by a factor of 10-20, both for the detectable amounts and the detection time, over the conventional material balance method with annual inventories. The reasons for and the conditions which would permit such improvements have been discussed in detail with numerical examples in the report. (orig.) [de

  14. Automation of electromagnetic compatability (EMC) test facilities

    Science.gov (United States)

    Harrison, C. A.

    1986-01-01

    Efforts to automate electromagnetic compatibility (EMC) test facilities at Marshall Space Flight Center are discussed. The present facility is used to accomplish a battery of nine standard tests (with limited variations) deigned to certify EMC of Shuttle payload equipment. Prior to this project, some EMC tests were partially automated, but others were performed manually. Software was developed to integrate all testing by means of a desk-top computer-controller. Near real-time data reduction and onboard graphics capabilities permit immediate assessment of test results. Provisions for disk storage of test data permit computer production of the test engineer's certification report. Software flexibility permits variation in the tests procedure, the ability to examine more closely those frequency bands which indicate compatibility problems, and the capability to incorporate additional test procedures.

  15. The Hazardous Waste/Mixed Waste Disposal Facility

    International Nuclear Information System (INIS)

    Bailey, L.L.

    1991-01-01

    The Hazardous Waste/Mixed Waste Disposal Facility (HW/MWDF) will provide permanent Resource Conservation and Recovery Act (RCRA) permitted storage, treatment, and disposal for hazardous and mixed waste generated at the Department of Energy's (DOE) Savannah River Site (SRS) that cannot be disposed of in existing or planned SRS facilities. Final design is complete for Phase I of the project, the Disposal Vaults. The Vaults will provide RCRA permitted, above-grade disposal capacity for treated hazardous and mixed waste generated at the SRS. The RCRA Part B Permit application was submitted upon approval of the Permit application, the first Disposal Vault is scheduled to be operational in mid 1994. The technical baseline has been established for Phase II, the Treatment Building, and preliminary design work has been performed. The Treatment Building will provide RCRA permitted treatment processes to handle a variety of hazardous and mixed waste generated at SRS in preparation for disposal. The processes will treat wastes for disposal in accordance with the Environmental Protection Agency's (EPA's) Land Disposal Restrictions (LDR). A RCRA Part B Permit application has not yet been submitted to SCDHEC for this phase of the project. The Treatment Building is currently scheduled to be operational in late 1996

  16. GeNF - Experimental report 2007

    Energy Technology Data Exchange (ETDEWEB)

    Pranzas, P K; Schreyer, A; Willumeit, R [GKSS-Forschungszentrum Geesthacht GmbH (Germany). Inst. fuer Materialforschung

    2008-11-05

    At the Geesthacht Neutron Facility GeNF about 203 experiments were performed in 2007 by GKSS and by or for external users, partners or contractors. In most cases the measurements were performed and analysed in cooperation by the guests and by the GKSS staff or by the permanent external user group staff. The activities, which are based on a proposal procedure and on the in house R and D program, are reported in 70 contributions in the present annual experimental report for the year 2007. The contributions may contain one or also several combined experiments. During 2007 the GKSS research reactor FRG-1 achieved an operation time of 204 days at the full 5 MW reactor power providing a neutron flux of ca. 1.4 x 10{sup 14} thermal neutrons/cm{sup 2}s. In May/June 2007 the FRG-1 was upgraded with a new cold neutron source yielding a flux increase at the five instruments using cold neutrons of up to 40 %. The focus of the in house R and D work at GeNF instruments in 2007 was the characterisation of nano-structures in engineering materials, the analysis of stresses and textures in welds and technical structures at SANS-2, DCD, ARES-2 and TEX-2, the structural investigation of hydrogen containing substances such as polymers, colloids and biological macromolecules at SANS-1 as well as the characterisation of magnetic thin films at NeRo, PNR, POLDI and ROeDI. The modern experiment control hardware and software based on LabView was continuously improved on all instruments. In the appendices I and II the experimental reports of the GKSS outstation at the FRM II are attached as well as of the GKSS outstation at DESY. At the neutron reflectometer REFSANS at FRM II measurements are possible using a broad range of the scattering vector with reflectivities up to 10{sup -7}. Three reports show the activities of GKSS in the field of texture measurement at the instrument STRESS-SPEC. The instrument HARWI II at DESY is accepted very well by the community and is overbooked in all fields

  17. GeNF - Experimental report 2007

    International Nuclear Information System (INIS)

    Pranzas, P.K.; Schreyer, A.; Willumeit, R.

    2008-01-01

    At the Geesthacht Neutron Facility GeNF about 203 experiments were performed in 2007 by GKSS and by or for external users, partners or contractors. In most cases the measurements were performed and analysed in cooperation by the guests and by the GKSS staff or by the permanent external user group staff. The activities, which are based on a proposal procedure and on the in house R and D program, are reported in 70 contributions in the present annual experimental report for the year 2007. The contributions may contain one or also several combined experiments. During 2007 the GKSS research reactor FRG-1 achieved an operation time of 204 days at the full 5 MW reactor power providing a neutron flux of ca. 1.4 x 10 14 thermal neutrons/cm 2 s. In May/June 2007 the FRG-1 was upgraded with a new cold neutron source yielding a flux increase at the five instruments using cold neutrons of up to 40 %. The focus of the in house R and D work at GeNF instruments in 2007 was the characterisation of nano-structures in engineering materials, the analysis of stresses and textures in welds and technical structures at SANS-2, DCD, ARES-2 and TEX-2, the structural investigation of hydrogen containing substances such as polymers, colloids and biological macromolecules at SANS-1 as well as the characterisation of magnetic thin films at NeRo, PNR, POLDI and ROeDI. The modern experiment control hardware and software based on LabView was continuously improved on all instruments. In the appendices I and II the experimental reports of the GKSS outstation at the FRM II are attached as well as of the GKSS outstation at DESY. At the neutron reflectometer REFSANS at FRM II measurements are possible using a broad range of the scattering vector with reflectivities up to 10 -7 . Three reports show the activities of GKSS in the field of texture measurement at the instrument STRESS-SPEC. The instrument HARWI II at DESY is accepted very well by the community and is overbooked in all fields (tomography

  18. Should advertising by aesthetic surgeons be permitted?

    Directory of Open Access Journals (Sweden)

    Neeraj Nagpal

    2017-01-01

    Full Text Available Cosmetic, aesthetic and cutaneous surgical procedures require qualified specialists trained in the various procedures and competent to handle complications. However, it also requires huge investments in terms of infrastructure, trained staff and equipment. To be viable advertising is essential to any establishment which provides cosmetic and aesthetic procedures. Business men with deep pockets establish beauty chains which also provide these services and advertise heavily to sway public opinion in their favour. However, these saloons and spas lack basic medical facilities in terms of staff or equipment to handle any complication or medical emergency. To have a level playing field ethical advertising should be permitted to qualified aesthetic surgeons as is permitted in the US and UK by their respective organisations.

  19. Sites Requiring Facility Response Plans, Geographic NAD83, EPA (2006) [facility_response_plan_sites_la_EPA_2007

    Data.gov (United States)

    Louisiana Geographic Information Center — Locations of facilities in Louisiana requiring Oil Pollution Act (OPA) Facility Response Plans (FRP). The dataset was provided by the Region 6 OSCARS program....

  20. Air Dispersion Modeling for the INL Application for a Synthetic Minor Sitewide Air Quality Permit to Construct with a Facility Emission Cap Component

    Energy Technology Data Exchange (ETDEWEB)

    Sondrup, Andrus Jeffrey [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-10-01

    The Department of Energy Idaho Operations Office (DOE-ID) is applying for a synthetic minor, Sitewide, air quality permit to construct (PTC) with a facility emission cap (FEC) component from the Idaho Department of Environmental Quality (DEQ) for Idaho National Laboratory (INL) to limit its potential to emit to less than major facility limits for criteria air pollutants (CAPs) and hazardous air pollutants (HAPs) regulated under the Clean Air Act. This document is supplied as an appendix to the application, Idaho National Laboratory Application for a Synthetic Minor Sitewide Air Quality Permit to Construct with a Facility Emissions Cap Component, hereafter referred to as “permit application” (DOE-ID 2015). Air dispersion modeling was performed as part of the permit application process to demonstrate pollutant emissions from the INL will not cause a violation of any ambient air quality standards. This report documents the modeling methodology and results for the air dispersion impact analysis. All CAPs regulated under Section 109 of the Clean Air Act were modeled with the exception of lead (Pb) and ozone, which are not required to be modeled by DEQ. Modeling was not performed for toxic air pollutants (TAPs) as uncontrolled emissions did not exceed screening emission levels for carcinogenic and non-carcinogenic TAPs. Modeling for CAPs was performed with the EPA approved AERMOD dispersion modeling system (Version 14134) (EPA 2004a) and five years (2000-2004) of meteorological data. The meteorological data set was produced with the companion AERMET model (Version 14134) (EPA 2004b) using surface data from the Idaho Falls airport, and upper-air data from Boise International Airport supplied by DEQ. Onsite meteorological data from the Grid 3 Mesonet tower located near the center of the INL (north of INTEC) and supplied by the local National Oceanic and Atmospheric Administration (NOAA) office was used for surface wind directions and wind speeds. Surface data (i

  1. Facility model for the Los Alamos Plutonium Facility

    International Nuclear Information System (INIS)

    Coulter, C.A.; Thomas, K.E.; Sohn, C.L.; Yarbro, T.F.; Hench, K.W.

    1986-01-01

    The Los Alamos Plutonium Facility contains more than sixty unit processes and handles a large variety of nuclear materials, including many forms of plutonium-bearing scrap. The management of the Plutonium Facility is supporting the development of a computer model of the facility as a means of effectively integrating the large amount of information required for material control, process planning, and facility development. The model is designed to provide a flexible, easily maintainable facility description that allows the faciltiy to be represented at any desired level of detail within a single modeling framework, and to do this using a model program and data files that can be read and understood by a technically qualified person without modeling experience. These characteristics were achieved by structuring the model so that all facility data is contained in data files, formulating the model in a simulation language that provides a flexible set of data structures and permits a near-English-language syntax, and using a description for unit processes that can represent either a true unit process or a major subsection of the facility. Use of the model is illustrated by applying it to two configurations of a fictitious nuclear material processing line

  2. Extension of ERIM multispectral data processing capabilities through improved data handling techniques

    Science.gov (United States)

    Kriegler, F. J.

    1973-01-01

    The improvement and extension of the capabilities of the Environmental Research Institute of Michigan processing facility in handling multispectral data are discussed. Improvements consisted of implementing hardware modifications which permitted more rapid access to the recorded data through improved numbering and indexing of such data. In addition, techniques are discussed for handling data from sources other than the ERIM M-5 and M-7 scanner systems.

  3. Radiologic safety program for ionizing radiation facilities in Parana, Brazil

    International Nuclear Information System (INIS)

    Schmidt, M.F.S.; Tilly Junior, J.G.

    1997-01-01

    A radiologic safety program for inspection, licensing and control of the use of ionizing radiation in medical, industrial and research facilities in Parana, Brazil is presented. The program includes stages such as: 1- division into implementation phases considering the activity development for each area; 2-use of the existing structure to implement and to improve services. The development of the program will permit to evaluate the improvement reached and to correct operational strategic. As a result, a quality enhancement at the services performed, a reduction for radiation dose exposure and a faster response for emergency situations will be expected

  4. Recovery Act: Hydroelectric Facility Improvement Project - Replacement of Current Mechanical Seal System with Rope Packing System

    Energy Technology Data Exchange (ETDEWEB)

    Stephens, Jessica D.

    2013-05-29

    On January 27, 2010 the City of North Little Rock, Arkansas received notification of the awarding of a Department of Energy (DOE) grant totaling $450,000 in funding from the American Recovery and Reinvestment Act (ARRA) under the Project Title: Recovery Act: Hydroelectric Facility Improvement Project – Automated Intake Clearing Equipment and Materials Management. The purpose of the grant was for improvements to be made at the City’s hydroelectric generating facility located on the Arkansas River. Improvements were to be made through the installation of an intake maintenance device (IMD) and the purchase of a large capacity wood grinder. The wood grinder was purchased in order to receive the tree limbs, tree trunks, and other organic debris that collects at the intake of the plant during high flow. The wood grinder eliminates the periodic burning of the waste material that is cleared from the intake and reduces any additional air pollution to the area. The resulting organic mulch has been made available to the public at no charge. Design discussion and planning began immediately and the wood grinder was purchased in July of 2010 and immediately put to work mulching debris that was gathered regularly from the intake of the facility. The mulch is currently available to the public for free. A large majority of the design process was spent in discussion with the Corps of Engineers to obtain approval for drawings, documents, and permits that were required in order to make changes to the structure of the powerhouse. In April of 2011, the City’s Project Engineer, who had overseen the application, resigned and left the City’s employ. A new Systems Mechanical Engineer was hired and tasked with overseeing the project. The transfer of responsibility led to a re-examination of the original assumptions and research upon which the grant proposal was based. At that point, the project went under review and a trip was booked for July 2011 to visit facilities that currently

  5. WIPP Facility Work Plan for Solid Waste Management Units

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2000-02-25

    This Facility Work Plan (FWP) has been prepared as required by Module VII,Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a). This work plan describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current New Mexico Environment Department (NMED) guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility’s Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to NMED’s guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The scope of work for the RFI Work Plan or SAP is being developed by the Permittees. The final content of the RFI Work Plan or SAP will be coordinated with the NMED for submittal on May 24, 2000. Specific project-related planning information will be included in the RFI Work Plan or SAP. The SWMU program at WIPP began in 1994 under U.S. Environmental Protection Agency (EPA) regulatory authority. NMED subsequently received regulatory authority from EPA

  6. A summary of sodium vapor trap experience at the Fast Flux Test Facility

    International Nuclear Information System (INIS)

    Schuck, W.J.

    1986-09-01

    Sodium vapor trap operation at the Fast Flux Test Facility has been successful although not uneventful. Analysis and evaluation of the behavior of the vapor traps associated with reactor cover gas processing and analysis systems has confirmed their design and has led to an improved understanding of these components and the environment in which they operate. This knowledge will permit simplification and reduced costs for future designs

  7. PERMITTING HAZARDOUS WASTE INCINERATORS

    Science.gov (United States)

    This publication is a compilation of information presented at a seminar series designed to address the issues that affect the issuance of hazardous waste incineration permits and to improve the overall understanding of trial burn testing. pecifically, the document provides guidan...

  8. Refurbishment of JMTR pure water facility

    International Nuclear Information System (INIS)

    Asano, Norikazu; Hanakawa, Hiroki; Kusunoki, Hidehiko; Satou, Shinichi

    2012-05-01

    In the refurbishment of JMTR, facilities were classified into which (1) were all updated, (2) were partly updated, and (3) were continuance used by the considerations of the maintenance history, the change parts availability and the latest technology. The JMTR pure water facility was classified into all updated facility based on the consideration. The Update construction was conducted in between FY2007 and FY2008. The refurbishment of JMTR pure water facility is summarized in this report. (author)

  9. 78 FR 72080 - Draft NPDES General Permit Modification for Discharges From the Oil and Gas Extraction Point...

    Science.gov (United States)

    2013-12-02

    ...). ACTION: Notice; Proposal of NPDES general permit modification. SUMMARY: EPA Region 6 today proposes... determine whether your facility, company, business, organization, etc. is regulated by this action, you..., Paperwork Reduction Act, and Regulatory Flexibility Act. The scope of Today's permit modification action...

  10. Hanford Facility Resource Conservation and Recovery Act Permit General Inspection Plan

    International Nuclear Information System (INIS)

    Beagles, D.S.

    1995-02-01

    This inspection plan describes the activities that shall be conducted for a general inspection of the Hanford Facility. RCRA includes a requirement that general facility inspections be conducted of the 100, 200 East, 200 West, 300, 400, and 1100 areas and the banks of the Columbia River. This plan meets the RCRA requirements and also provides for scheduling of inspections and defines general and specific items to be noted during the inspections

  11. Trends in Maternity Care Practice Skin-to-Skin Contact Indicators: United States, 2007-2015.

    Science.gov (United States)

    Boundy, Ellen O; Perrine, Cria G; Barrera, Chloe M; Li, Ruowei; Hamner, Heather C

    2018-05-21

    Mother-infant skin-to-skin contact (SSC) immediately after birth helps transition infants to the post-uterine environment and increases the likelihood of breastfeeding initiation and duration. This study examines trends in U.S. maternity practices related to SSC, and variations by facility demographics. Data were from the Maternity Practices in Infant Nutrition and Care (mPINC) surveys (2007-2015), a biennial assessment of all U.S. maternity facilities. Facilities reported how often patients were encouraged to practice mother-infant SSC for ≥30 minutes within 1 hour of uncomplicated vaginal birth and 2 hours of uncomplicated cesarean birth, and how often routine infant procedures are performed while in SSC. We calculated the percentage of maternity facilities reporting these indicators for ≥90% of patients across the United States for each survey year. Estimates by facility characteristics (size, type, and state) were calculated for 2015 only. The percentage of facilities reporting "Most (≥90%)" women, which were encouraged to practice early SSC, increased from 2007 to 2015 following both vaginal (40.4% to 83.0%) and cesarean (29.3% to 69.9%) births. The percentage of facilities reporting routine infant procedures were performed "Almost always (≥90%)," while mother and infant were SSC increased from 16.6% to 49.5% (2007 to 2015) for vaginal births and from 2.2% to 10.7% (2009 to 2015) for cesarean births. Variations in SSC practice by facility type, size, and state were noted. Significant progress has been made in increasing hospital encouragement of early SSC for both vaginal and cesarean births. Continued efforts to support evidence-based maternity practices are needed.

  12. 78 FR 73144 - Acceleration of Broadband Deployment by Improving Wireless Facilities Siting Policies

    Science.gov (United States)

    2013-12-05

    ... license is required, which in turn extends to any apparatus for the transmission of energy, or... No. 11-59; FCC 13-122] Acceleration of Broadband Deployment by Improving Wireless Facilities Siting... of new wireless facilities and on rules to implement statutory provisions governing State and local...

  13. Fisher Sand & Gravel New Mexico, Inc. General Air Quality Permit: Related Documents

    Science.gov (United States)

    Documents related to the Fisher Sand & Gravel – New Mexico, Inc., Grey Mesa Gravel Pit General Air Quality Permit for New or Modified Minor Source Stone Quarrying, Crushing, and Screening Facilities in Indian Country.

  14. Permitting plan for the high-level waste interim storage

    International Nuclear Information System (INIS)

    Deffenbaugh, M.L.

    1997-01-01

    This document addresses the environmental permitting requirements for the transportation and interim storage of solidified high-level waste (HLW) produced during Phase 1 of the Hanford Site privatization effort. Solidified HLW consists of canisters containing vitrified HLW (glass) and containers that hold cesium separated during low-level waste pretreatment. The glass canisters and cesium containers will be transported to the Canister Storage Building (CSB) in a U.S. Department of Energy (DOE)-provided transportation cask via diesel-powered tractor trailer. Tri-Party Agreement (TPA) Milestone M-90 establishes a new major milestone, and associated interim milestones and target dates, governing acquisition and/or modification of facilities necessary for: (1) interim storage of Tank Waste Remediation Systems (TWRS) immobilized HLW (IHLW) and other canistered high-level waste forms; and (2) interim storage and disposal of TWRS immobilized low-activity tank waste (ILAW). An environmental requirements checklist and narrative was developed to identify the permitting path forward for the HLW interim storage (HLWIS) project (See Appendix B). This permitting plan will follow the permitting logic developed in that checklist

  15. ONKALO - Main drawings in 2007

    International Nuclear Information System (INIS)

    2008-05-01

    The first overall site characterisation programme for a Finnish repository of spent nuclear fuel was introduced in 1982. This programme already suggested that the site confirmation for a detailed repository design and safety assessment should include characterisation performed in an underground rock characterisation facility (URCF). This idea was confirmed during the detailed site characterisation. International views have also emphasised the importance of underground characterisation before the final decision to construct the repository is taken. The underground rock characterisation facility (ONKALO) is excavated at Olkiluoto in the municipality of Eurajoki. ONKALO should be constructed to allow characterisation work for site confirmation without jeopardising long-term safety of the repository site. It should also be possible to link ONKALO later to the repository as to a part of it. The construction of ONKALO was started in 2004 and will be completed in 2014. The characterisation work has started in ONKALO and will focus on the disposal depth. In the main drawings stage, ONKALO was described at the level of detail needed for a construction permit in 2003. This meant description of the location, final structures and final systems. This summary report describes the development of design to updated main drawings in 2007 at the same level of detail (no temporary arrangements are described). The main changes are the added exhaust air shaft and advancing the controlled area's inlet air shaft to the ONKALO phase. Also the layout and the depth of the characterisation levels have been updated according to the current bedrock information. Some buildings on the surface will house sets of equipment directly connected with underground facility and this equipment is described in this report. No buildings or other equipment are described in this report, because they are not directly connected with the underground facility. The main element of ONKALO is a system of

  16. Process for evaluation of renewal of the operating permit for Garona NPP

    International Nuclear Information System (INIS)

    Zarzuela Jimenez, J.

    2009-01-01

    Process for evaluation of renewal of the operating permit for Garona NPP. The Santa Maria de Garona nuclear power plant has requested the renewal of its operating permit for a period of ten years, this implying extension of the operating lifetime of the facility beyond the 40 years originally established. This article explains the process of evaluation that the CSN is carrying out in order to draw up a report on the technical feasibility of this proposal. (Author)

  17. Quality Improvement in Skilled Nursing Facilities for Residents With Alzheimer's Disease.

    Science.gov (United States)

    Farlow, Martin R; Borson, Soo; Connor, Stephen R; Grossberg, George T; Mittelman, Mary S

    2016-03-01

    This report describes a quality improvement continuing medical education activity designed to enhance the recognition and treatment of residents with Alzheimer's disease (AD) or other dementias in skilled-nursing facilities (SNFs). Charts were compared in 6 areas prior to and following (stages A and C) a live, faculty-led workshop (stage B). Four SNFs completed stages A (n = 67 residents) and B, and 3 SNFs completed stage C (n = 52 residents). All charts came from residents with AD or a diagnosis of dementia or dementia-like symptoms. The SNFs had >95% baseline performance in both the frequency of cognitive assessments and documented medication reviews. The percentage of residents who received a quality-of-life assessment and those who had a mental health care plan in place represent areas for improvement. As part of this activity, a toolkit was developed to help guide facilities and clinicians in instituting care improvements for residents with AD/dementia. © The Author(s) 2015.

  18. 40 CFR 125.3 - Technology-based treatment requirements in permits.

    Science.gov (United States)

    2010-07-01

    ... fundamentally different control technology than under permits for an industrial category issued before such date... reduction benefits to be achieved from such application; (ii) The age of equipment and facilities involved... to the cost and level of reduction of such pollutants from a class or category of industrial sources...

  19. 32 CFR 644.486 - Disposal of buildings and improvements constructed under emergency plant facilities (EPF) or...

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Disposal of buildings and improvements constructed under emergency plant facilities (EPF) or similar contracts. 644.486 Section 644.486 National... Disposal of buildings and improvements constructed under emergency plant facilities (EPF) or similar...

  20. 10 CFR 205.328 - Environmental requirements for Presidential Permits-Alternative 1.

    Science.gov (United States)

    2010-01-01

    ... Facilities for Transmission of Electric Energy at International Boundaries § 205.328 Environmental... 10 Energy 3 2010-01-01 2010-01-01 false Environmental requirements for Presidential Permits... responsible for the costs of preparing any necessary environmental document, including an Environmental Impact...

  1. A summary of sodium vapor trap experience at the Fast Flux Test Facility

    Energy Technology Data Exchange (ETDEWEB)

    Schuck, W J [Westinghouse Hanford Company, Richland, WA (United States)

    1987-07-01

    Sodium vapor trap operation at the Fast Flux Test Facility has been successful although not uneventful. Analysis and evaluation of the behavior of the vapor traps associated with reactor cover gas processing and analysis systems has confirmed their design and has led to an improved understanding of these components and the environment in which they operate. This knowledge will permit simplification and reduced costs for future designs (author)

  2. Improved E-ELT subsystem and component specifications, thanks to M1 test facility

    Science.gov (United States)

    Dimmler, M.; Marrero, J.; Leveque, S.; Barriga, Pablo; Sedghi, B.; Kornweibel, N.

    2014-07-01

    During the last 2 years ESO has operated the "M1 Test Facility", a test stand consisting of a representative section of the E-ELT primary mirror equipped with 4 complete prototype segment subunits including sensors, actuators and control system. The purpose of the test facility is twofold: it serves to study and get familiar with component and system aspects like calibration, alignment and handling procedures and suitable control strategies on real hardware long before the primary mirror (hereafter M1) components are commissioned. Secondly, and of major benefit to the project, it offered the possibility to evaluate component and subsystem performance and interface issues in a system context in such detail, that issues could be identified early enough to feed back into the subsystem and component specifications. This considerably reduces risk and cost of the production units and allows refocusing the project team on important issues for the follow-up of the production contracts. Experiences are presented in which areas the results of the M1 Test Facility particularly helped to improve subsystem specifications and areas, where additional tests were adopted independent of the main test facility. Presented are the key experiences of the M1 Test Facility which lead to improved specifications or identified the need for additional testing outside of the M1 Test Facility.

  3. ILL, Annual report 2007 - 40. anniversary - 1967/2007

    International Nuclear Information System (INIS)

    2007-01-01

    This annual report is divided into 5 main parts: 1) scientific highlights, 2) millennium programme and technical developments, 3) experimental and user programme, 4) reactor operation and 5) workshops and events. Once again in 2007 about one third of the experiments were related to magnetism. Among the research works performed in 2007 we can quote the following issues: the processes that occur in batteries, the high Tc superconductivity, quantum criticality, the light-induced spin transition, the improvement of welding techniques, the behaviour of ferromagnetic shape memory alloy or polymer composites under load, the dynamic structure factor of liquid deuteromethane, the hydration of divalent mercury in aqueous solution, the neutrino asymmetry parameter B in neutron decay, the decay of Sb 132 and the wavelength-shifting effect when neutrons traverse accelerated matter. (A.C.)

  4. ILL, Annual report 2007 - 40. anniversary - 1967/2007

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    This annual report is divided into 5 main parts: 1) scientific highlights, 2) millennium programme and technical developments, 3) experimental and user programme, 4) reactor operation and 5) workshops and events. Once again in 2007 about one third of the experiments were related to magnetism. Among the research works performed in 2007 we can quote the following issues: the processes that occur in batteries, the high Tc superconductivity, quantum criticality, the light-induced spin transition, the improvement of welding techniques, the behaviour of ferromagnetic shape memory alloy or polymer composites under load, the dynamic structure factor of liquid deuteromethane, the hydration of divalent mercury in aqueous solution, the neutrino asymmetry parameter B in neutron decay, the decay of Sb{sup 132} and the wavelength-shifting effect when neutrons traverse accelerated matter. (A.C.)

  5. Evaluating Fidelity to a Modified NIATx Process Improvement Strategy for Improving HIV Services in Correctional Facilities.

    Science.gov (United States)

    Pankow, Jennifer; Willett, Jennifer; Yang, Yang; Swan, Holly; Dembo, Richard; Burdon, William M; Patterson, Yvonne; Pearson, Frank S; Belenko, Steven; Frisman, Linda K

    2018-04-01

    In a study aimed at improving the quality of HIV services for inmates, an organizational process improvement strategy using change teams was tested in 14 correctional facilities in 8 US states and Puerto Rico. Data to examine fidelity to the process improvement strategy consisted of quantitative ratings of the structural and process components of the strategy and qualitative notes that explicate challenges in maintaining fidelity to the strategy. Fidelity challenges included (1) lack of communication and leadership within change teams, (2) instability in team membership, and (3) issues with data utilization in decision-making to implement improvements to services delivery.

  6. Horonobe Underground Research Laboratory project. Investigation report for the 2007 fiscal year

    International Nuclear Information System (INIS)

    Nakayama, Masashi; Sanada, Hiroyuki; Sugita, Yutaka

    2008-09-01

    The Horonobe Underground Research Laboratory Project is planned to extend over a period of 20 years. The investigations will be conducted in three phases, namely 'Phase 1: Surface-based investigations', 'Phase 2: Construction Phase' (investigations during construction of the underground facilities) and 'Phase 3: Operation phase' (research in the underground facilities). This report summarizes the results of the investigations for the 2007 fiscal year (2007/2008), the 3rd year of the Phase 2 investigations. The investigations, which are composed of 'Geoscientific research' and 'R and D on the geological disposal of high-level radioactive waste (HLW)', were carried out according to 'Horonobe Underground Research Laboratory Project Investigation Program for the 2007 Fiscal Year'. The results of these investigations, along with the results which were obtained in other departments of Japan Atomic Energy Agency (JAEA), are properly offered to the implementations and the safety regulations. JAEA proceeded with the project in collaboration with experts from domestic and overseas research organisation. (author)

  7. Evolution de la surveillance des PM10 en France : épisodes de pollution par les particules au printemps 2007

    OpenAIRE

    Aymoz , Gilles; Bessagnet , Bertrand; Rouil , Laurence; Le Bihan , Olivier

    2008-01-01

    National audience; Since the 1st January 2007, PM10 monitoring network in France has evolved, in order to account for volatile fraction of PM10. This evolution permitted the observation of high peaks of PM10 during spring 2007. Concentrations during these peaks would have been largely underestimated with measuring techniques used before 2007. A study, coupling chemical and modelling approach of the phenomenon has been launched by LCSQA (Laboratoire Central de Surveillance de la Qualité de l'A...

  8. Honeywell Engines, Systems and Services, Phoenix, Arizona, Dec. 10, 2007 Petition to Object to Title V Operating Permit

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  9. Idaho National Laboratory Cultural Resource Monitoring Report for Fiscal Year 2007

    Energy Technology Data Exchange (ETDEWEB)

    Brenda R. Pace

    2007-10-01

    This report describes the cultural resource monitoring activities of the Idaho National Laboratory’s (INL) Cultural Resource Management (CRM) Office during fiscal year 2007 (FY 2007). In FY 2007, 40 localities were revisited: two locations of heightened Shoshone-Bannock tribal sensitivity, four caves, three butte/craters, twelve prehistoric archaeological sites, two historic stage stations, nine historic homesteads, a portion of Goodale’s Cutoff of the Oregon Trail, a portion of historic trail T-16, one World War II dump, four buildings from the World War II period, and Experimental Breeder Reactor –I, a modern scientific facility and National Historic Landmark. Several INL project areas were also monitored in FY 2007. This included direct observation of ground disturbing activities within the Power Burst Facility (PBF, now designated as the Critical Infrastructure Test Range Complex – CITRC), backfilling operations associated with backhoe trenches along the Big Lost River, and geophysical surveys designed to pinpoint subsurface unexploded ordnance in the vicinity of the Naval Ordnance Disposal Area. Surprise checks were also made to three ongoing INL projects to ensure compliance with INL CRM Office recommendations to avoid impacts to cultural resources. Although some impacts were documented, no significant adverse effects that would threaten the National Register eligibility of any resource were observed at any location.

  10. Idaho National Laboratory Cultural Resource Monitoring Report for Fiscal Year 2007

    International Nuclear Information System (INIS)

    Brenda R. Pace

    2007-01-01

    This report describes the cultural resource monitoring activities of the Idaho National Laboratory's (INL) Cultural Resource Management (CRM) Office during fiscal year 2007 (FY 2007). In FY 2007, 40 localities were revisited: two locations of heightened Shoshone-Bannock tribal sensitivity, four caves, three butte/craters, twelve prehistoric archaeological sites, two historic stage stations, nine historic homesteads, a portion of Goodale's Cutoff of the Oregon Trail, a portion of historic trail T-16, one World War II dump, four buildings from the World War II period, and Experimental Breeder Reactor-I, a modern scientific facility and National Historic Landmark. Several INL project areas were also monitored in FY 2007. This included direct observation of ground disturbing activities within the Power Burst Facility (PBF, now designated as the Critical Infrastructure Test Range Complex-CITRC), backfilling operations associated with backhoe trenches along the Big Lost River, and geophysical surveys designed to pinpoint subsurface unexploded ordnance in the vicinity of the Naval Ordnance Disposal Area. Surprise checks were also made to three ongoing INL projects to ensure compliance with INL CRM Office recommendations to avoid impacts to cultural resources. Although some impacts were documented, no significant adverse effects that would threaten the National Register eligibility of any resource were observed at any location

  11. Strategic facility planning improves capital decision making.

    Science.gov (United States)

    Reeve, J R

    2001-03-01

    A large, Midwestern IDS undertook a strategic facility-planning process to evaluate its facility portfolio and determine how best to allocate future investments in facility development. The IDS assembled a facility-planning team, which initiated the planning process with a market analysis to determine future market demands and identify service areas that warranted facility expansion. The team then analyzed each of the IDS's facilities from the perspective of uniform capacity measurements, highest and best use compared with needs, building condition and investment-worthiness, and facility growth and site development opportunities. Based on results of the analysis, the strategy adopted entailed, in part, shifting some space from inpatient care to ambulatory care services and demolishing and replacing the 11 percent of facilities deemed to be in the worst condition.

  12. Areva. 2007 figures economic, social, societal and environmental data; Areva. Chiffres 2007 donnees economiques, sociales, societales et environnementales

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    This document presents the 2007 economic, social, societal and environmental data of the Areva Group. Content: 1 - Improvement initiative: Continuous improvement, Innovation; 2 - Financial performance: 2007 results; 3 - Commitment to employees: Stakeholder relations, Health and safety, Radiation protection, Radiological impacts, Technological risks, Workforce, Workforce and training; 4 - Environment: Water, Energy, Gaseous releases, Liquid releases, Conventional waste, Radioactive waste; 5 - Reporting and performance indicators: Reporting methodology, Auditors' report, Social indicators, Environmental indicators.

  13. 9 CFR 93.511 - Swine quarantine facilities.

    Science.gov (United States)

    2010-01-01

    ...) Privately operated quarantine facilities. The importer, or his or her agent, of swine subject to quarantine... of any import permit. The facilities occupied by swine should be kept clean and sanitary to the... described in paragraph (b) of this section. The importer, or his or her agent, shall request in writing such...

  14. A Dual-Based Procedure for Dynamic Facility Location

    OpenAIRE

    Tony J. Van Roy; Donald Erlenkotter

    1982-01-01

    In dynamic facility location problems, one desires to select the time-staged establishment of facilities at different locations so as to minimize the total discounted costs for meeting demands specified over time at various customer locations. We formulate a particular dynamic facility location problem as a combinatorial optimization problem. The formulation permits both the opening of new facilities and the closing of existing ones. A branch-and-bound procedure incorporating a dual ascent me...

  15. Radiotherapy professionals faced with the obligation of treatments safety improvement

    International Nuclear Information System (INIS)

    2011-01-01

    The occurrence of a major accident in Epinal (2006), followed by one in Toulouse (2007), led the Ministry of Health to mobilize the whole actors in radiotherapy in order to define national measures intended to improve health care security. Compiled in the so-called 'road map', these measures were presented in November 2007, and implemented in the 2009-2013 cancer programme. The French Institute for Radiological Protection and Nuclear Safety (IRSN) undertook a study aiming at assessing the effects of the above-mentioned measures on organization and safety management of radiotherapy facilities, but also on treatment achievement procedures and health professionals. More specifically, IRSN sought to examine the ability of health professionals to take into account new safety demands and to adapt their practices accordingly. With these purposes objectives, a qualitative study using the methods of ergonomics and sociology of organizations was completed in 2009-2010. The results of the study presented in this report show an effective improvement of health care safety along with a variable integration of safety measures depending on radiotherapy facilities and units. In particular, integration depends on 1) the governance mode of the health care facility, more or less conducive to promoting safety, 2) the pre-existence of a safety culture and safety organization, and 3) the facility commitment to health care safety improvement actions. The study also reveals that the implementation of new safety demands and the changes they involve create new constraints, which put pressure on health professionals and may threaten the durability of the improvements made. In order to facilitate the appropriation and implementation by radiotherapy units of the measures meant to improve health care safety, IRSN identifies 6 lines of thought: - strengthen coordination between institutional actors in order to ensure the consistency of the requests addressed to the facilities and limit their

  16. Hanford Site Near-Facility Environmental Monitoring Data Report for Calendar Year 2007- Appendix 2

    Energy Technology Data Exchange (ETDEWEB)

    Perkins, Craig J.; Dorsey, Michael; Mckinney, Stephen M.; Wilde, Justin W.; Duncan, Joanne P.

    2008-10-13

    Near-facility environmental monitoring is defined as monitoring near facilities that have the potential to discharge or have discharged, stored, or disposed of radioactive or hazardous materials. Monitoring locations are associated with nuclear facilities such as the Plutonium Finishing Plant (PFP), Canister Storage Building (CSB), and the K Basins; inactive nuclear facilities such as N Reactor and the Plutonium-Uranium Extraction (PUREX) Facility; and waste storage or disposal facilities such as burial grounds, cribs, ditches, ponds, tank farms, and trenches. Much of the monitoring consists of collecting and analyzing environmental samples and methodically surveying areas near facilities. The program is also designed to evaluate acquired analytical data, determine the effectiveness of facility effluent monitoring and controls, assess the adequacy of containment at waste disposal units, and detect and monitor unusual conditions.

  17. Do Access to Improved Water Source and Sanitation Facility Accelerate Economic Growth in Bangladesh?

    Directory of Open Access Journals (Sweden)

    Sandip SARKER

    2016-04-01

    Full Text Available This paper examines the relationship among access to improved water, sanitation and economic growth in Bangladesh through co-integration and vector error correction model (VECM over the period 1991 to 2014. Bangladesh has registered remarkable progress in achieving major Millennium Development Goals (MDG. Today nearly 87% of our total population has access to improved water sources and 60% have access to improved sanitation facilities which is contributing significantly towards human development in Bangladesh. Therefore we want to test whether access to improved water and sanitation accelerates economic growth in Bangladesh through a time series analysis. The Johansen co-integration tests indicate that there is long run association among the variables. The vector error correction model indicates that there is a long run causality running from improved sanitation facilities (% of population with access and improved water source (% of population with access to gross domestic product in Bangladesh. Similarly in the short run a causal relationship has been found among the variables as well. Further impulse response function and variance decomposition results say that improved sanitation facilities (% of population with access and improved water source (% of population with access can explain the major variations in our economic growth. The implication of our findings is that in Bangladesh an increase in improved access to water and sanitation is likely to positively affect our economic growth in the long run. Keeping in mind about Sustainable Development Goals (SDG, policymakers in Bangladesh need to pay special attention to ensure greater access to improved water and sanitation to boost our economic growth & development.

  18. sUAS Facility Map - Download dataset

    Data.gov (United States)

    Department of Transportation — sUAS Facility Maps (UASFM) that indicate “pre-approved fly altitudes.” Within each grid on the map, FAA would identify maximum altitudes at which flight is permitted...

  19. 77 FR 53236 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Science.gov (United States)

    2012-08-31

    ... protection. The regulations establish such a permit system to designate Antarctic Specially Protected Areas... facilities that may be present, verify that the reasons for special protection remain valid, verify that the... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic...

  20. The Impact of Special Focus Facility Nursing Homes on Market Quality

    Science.gov (United States)

    Castle, Nicholas G.; Sonon, Kristen; Antonova, Jenya

    2010-01-01

    Purpose: Special Focus Facilities (SFFs) are nursing facilities designated by the Centers for Medicare & Medicaid Services to be of chronic poor quality. Relatively few nursing facilities are included in this initiative. The purpose of this research was to examine whether nursing facilities included in the 2007 SFF initiative subsequently…

  1. 20 CFR 654.413 - Cooking and eating facilities.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Cooking and eating facilities. 654.413... Cooking and eating facilities. (a) When workers or their families are permitted or required to cook in their individual unit, a space shall be provided and equipped for cooking and eating. Such space shall...

  2. Possibilities for improved practice, decision support for permit applications of ash utilization in constructions; Laett att goera raett, beslutsunderlag foer miljoeproevning av askor i anlaeggningar

    Energy Technology Data Exchange (ETDEWEB)

    Toller, Susanna; Johansson, Mats; Wik, Ola; Erlandsson, Aasa; Lundberg, Kristina

    2011-02-15

    Combustion of solid biofuels, peat and different types of waste in Sweden for the purpose of energy production generates approximately 1.3 million tonnes of residues yearly. These have varying chemical and technical properties, depending on the type of fuel, the combustion process and the type of furnace. From a technical point of view, some of the ashes may be used for civil works. However, the Swedish Environmental Code requires that operators obtain a permit from the local environmental authorities if ashes are utilized for construction purposes. Previous studies on the application and permitting process have indicated that it can be improved, in particular both the information provided by the operators and the decision process. The stakeholders involved in the decision process have expressed that they have limited knowledge on expected environmental impacts from the utilization of ashes in civil works and that existing knowledge not is being fully applied in practice. The aim of this project was to improve the decision support for permit application of ash utilization in constructions. The goals were to - initiate and develop the discussion regarding which information should be used in the decision process - suggest the scope and content of the information to be supplied in the permit application - contribute to improved communication between different stakeholders - identify possibilities of using the knowledge obtained by research for decision support The stakeholders' (operators and environmental authorities) opinions and viewpoint on the assessment and application process were achieved through interviews. The results from the interviews were presented and discussed during a seminar. Both the interviews and the seminar provided information, but at the same time they served to initiate a discussion on permit application procedure and to increase the communication between different stakeholders. The outcomes from these activities (interviews and seminar

  3. Do convection-permitting models improve the representation of the impact of LUC?

    Science.gov (United States)

    Vanden Broucke, Sam; Van Lipzig, Nicole

    2017-10-01

    In this study we assess the added value of convection permitting scale (CPS) simulations in studies using regional climate models to quantify the bio-geophysical climate impact of land-use change (LUC). To accomplish this, a comprehensive model evaluation methodology is applied to both non-CPS and CPS simulations. The main characteristics of the evaluation methodology are (1) the use of paired eddy-covariance site observations (forest vs open land) and (2) a simultaneous evaluation of all surface energy budget components. Results show that although generally satisfactory, non-CPS simulations fall short of completely reproducing the observed LUC signal because of three key biases. CPS scale simulations succeed at significantly reducing two of these biases, namely, those in daytime shortwave radiation and daytime sensible heat flux. Also, CPS slightly reduces a third bias in nighttime incoming longwave radiation. The daytime improvements can be attributed partially to the switch from parameterized to explicit convection, the associated improvement in the simulation of afternoon convective clouds, and resulting surface energy budget and atmospheric feedbacks. Also responsible for the improvements during daytime is a better representation of surface heterogeneity and thus, surface roughness. Meanwhile, the modest nighttime longwave improvement can be attributed to increased vertical atmospheric resolution. However, the model still fails at reproducing the magnitude of the observed nighttime longwave difference. One possible explanation for this persistent bias is the nighttime radiative effect of biogenic volatile organic compound emissions over the forest site. A correlation between estimated emission rates and the observed nighttime longwave difference, as well as the persistence of the longwave bias provide support for this hypothesis. However, more research is needed to conclusively determine if the effect indeed exists.

  4. Improving children's nutrition environments: A survey of adoption and implementation of nutrition guidelines in recreational facilities

    Directory of Open Access Journals (Sweden)

    Downs Shauna M

    2011-06-01

    Full Text Available Abstract Background Although the mandate of recreational facilities is to enhance well-being, many offer foods inconsistent with recommendations for healthy eating. Little is known regarding recreational facility food environments and how they might be improved, as few studies exist. The Alberta Nutrition Guidelines for Children and Youth (ANGCY are intended to ensure access to healthy food choices in schools, childcare and recreational facilities. This study investigated awareness, adoption and implementation of the ANGCY among recreational facilities in Alberta, Canada, one year following their release. Methods A cross-sectional telephone survey was conducted from June - December, 2009 (n = 151 with managers of publicly funded recreational facilities that served food. The questionnaire included 10 closed and 7 open ended questions to assess the organizational priority for healthy eating, awareness, adoption and implementation of the ANGCY. Chi-squared tests examined quantitative variables, while qualitative data were analysed using directed content analysis. Greenhalgh's model of diffusion of complex innovations within health service organizations constituted the theoretical framework for the study. Results One half of respondents had heard of the ANGCY, however their knowledge of them was limited. Although 51% of facilities had made changes to improve the nutritional quality of foods offered in the past year, only a small fraction (11% of these changes were motivated by the ANGCY. At the time of the survey, 14% of facilities had adopted the ANGCY and 6% had implemented them. Barriers to adoption and implementation were primarily related to perceived negative attributes of the ANGCY, the inner (organizational context, and negative feedback received during the implementation process. Managers strongly perceived that implementing nutrition guidelines would limit their profit-making ability. Conclusions If fully adopted and implemented, the ANGCY

  5. The state of improvement of security management setup in the Japan Atomic Power Company and improvement of facilities in its Tsuruga Nuclear Power Station

    International Nuclear Information System (INIS)

    1982-01-01

    In connection with the series of accidents in the Tsuruga Nuclear Power Station of the Japan Atomic Power Company, the state of security management in JAPC and the safety of facilities in the Tsuruga Nuclear Power Station, which have resulted from improvement efforts, are described on the following items: security management setup - communication and reporting in emergency, the management of inspection and maintenance records, work control and supervision in repair, improvement, etc., functional authority and responsibility in maintenance management, operation management, radiation control, personnel education; improvement of facilities - feed water heaters, laundry waste-water filter room, radioactive waste treatment facility, general drainage, concentrated waste liquid storage tanks in newly-built waste treatment building, etc. (Mori, K.)

  6. The Rock Characterization Facility

    International Nuclear Information System (INIS)

    Holmes, J.

    1994-01-01

    In 1989, UK Nirex began a programme of surface-based characterization of the geology and hydrogeology of a site at Sellafield to evaluate its suitability to host a deep repository for radioactive waste. The next major stage in site characterization will be the construction and operation of a Rock Characterization Facility (RCF). It will be designed to provide rock characterization information and scope for model validation to permit firmer assessment of long-term safety. It will also provide information needed to decide the detailed location, design and orientation of a repository and to inform repository construction methods. A three-phase programme is planned for the RCF. During each phase, testwork will steadily improve our geological, hydrogeological and geotechnical understanding of the site. The first phase will involve sinking two shafts. That will be preceded by the establishment of a network of monitoring boreholes to ensure that the impact of shaft sinking can be measured. This will provide valuable data for model validation. In phase two, initial galleries will be excavated, probably at a depth of 650 m below Ordnance datum, which will host a comprehensive suite of experiments. These galleries will be extended in phase three to permit access to most of the rock volume that would host the repository. (Author)

  7. NPDES Draft Permit for City of New Town Water Treatment Plant in North Dakota

    Science.gov (United States)

    Under National Pollutant Discharge Elimination System draft permit number ND0031151, The City of New Town Water Treatment Plant is authorized to discharge from its wastewater treatment facility in Mountrail County, North Dakota.

  8. National Ignition Facility subsystem design requirements NIF site improvements SSDR 1.2.1

    International Nuclear Information System (INIS)

    Kempel, P.; Hands, J.

    1996-01-01

    This Subsystem Design Requirements (SSDR) document establishes the performance, design, and verification requirements associated with the NIF Project Site at Lawrence Livermore National Laboratory (LLNL) at Livermore, California. It identifies generic design conditions for all NIF Project facilities, including siting requirements associated with natural phenomena, and contains specific requirements for furnishing site-related infrastructure utilities and services to the NIF Project conventional facilities and experimental hardware systems. Three candidate sites were identified as potential locations for the NIF Project. However, LLNL has been identified by DOE as the preferred site because of closely related laser experimentation underway at LLNL, the ability to use existing interrelated infrastructure, and other reasons. Selection of a site other than LLNL will entail the acquisition of site improvements and infrastructure additional to those described in this document. This SSDR addresses only the improvements associated with the NIF Project site located at LLNL, including new work and relocation or demolition of existing facilities that interfere with the construction of new facilities. If the Record of Decision for the PEIS on Stockpile Stewardship and Management were to select another site, this SSDR would be revised to reflect the characteristics of the selected site. Other facilities and infrastructure needed to support operation of the NIF, such as those listed below, are existing and available at the LLNL site, and are not included in this SSDR. Office Building. Target Receiving and Inspection. General Assembly Building. Electro- Mechanical Shop. Warehousing and General Storage. Shipping and Receiving. General Stores. Medical Facilities. Cafeteria services. Service Station and Garage. Fire Station. Security and Badging Services

  9. Improvements in detection system for pulse radiolysis facility

    CERN Document Server

    Rao, V N; Manimaran, P; Mishra, R K; Mohan, H; Mukherjee, T; Nadkarni, S A; Sapre, A V; Shinde, S J; Toley, M

    2002-01-01

    This report describes the improvements made in the detection system of the pulse radiolysis facility based on a 7 MeV Linear Electron Accelerator (LINAC) located in the Radiation Chemistry and Chemical Dynamics Division of Bhabha Atomic Research Centre. The facility was created in 1986 for kinetic studies of transient species whose absorption lies between 200 and 700 nm. The newly developed detection circuits consist of a silicon (Si) photodiode (PD) detector for the wavelength range 450-1100 nm and a germanium (Ge) photodiode detector for the wavelength range 900-1600 nm. With these photodiode-based detection set-up, kinetic experiments are now routinely carried out in the wavelength range 450-1600 nm. The performance of these circuits has been tested using standard chemical systems. The rise time has been found to be 150 ns. The photo-multiplier tube (PMT) bleeder circuit has been modified. A new DC back-off circuit has been built and installed in order to avoid droop at longer time scales. A steady baselin...

  10. Current status of the first interim spent fuel storage facility in Japan

    International Nuclear Information System (INIS)

    Shinbo, Hitoshi; Kondo, Mitsuru

    2008-01-01

    In Japan, storage of spent fuels outside nuclear power plants was enabled as a result of partial amendments to the Nuclear Reactor Regulation Law in June 2000. Five months later, Mutsu City in Aomori Prefecture asked the Tokyo Electric Power Company (TEPCO) to conduct technical surveys on siting of the interim spent fuel storage facility (we call it 'Recyclable-Fuel Storage Center'). In April 2003, TEPCO submitted the report on siting feasibility examination, concluded that no improper engineering data for siting, construction of the facility will be possible from engineering viewpoint. Siting Activities for publicity and public acceptance have been continued since then. After these activities, Aomori Prefecture and Mutsu City approved siting of the Recyclable Fuel Storage Center in October 2005. Aomori Prefecture, Mutsu City, TEPCO and Japan Atomic Power Company (JAPC) signed an agreement on the interim spent fuel storage Facility. A month later, TEPCO and JAPC established Recyclable-Fuel Storage Company (RFS) in Mutsu City through joint capital investment, specialized in the first interim spent fuel storage Facility in Japan. In May 2007, we made an application for establishment permit, following safety review by regulatory authorities. In March 2008, we started the preparatory construction. RFS will safely store of spent fuels of TEPCO and JAPC until they will be reprocessed. Final storage capacity will be 5,000 ton-U. First we will construct the storage building of 3,000 ton-U to be followed by second building. We aim to start operation by 2010. (author)

  11. Salmonella enterica pulsed-field gel electrophoresis clusters, Minnesota, USA, 2001-2007.

    Science.gov (United States)

    Rounds, Joshua M; Hedberg, Craig W; Meyer, Stephanie; Boxrud, David J; Smith, Kirk E

    2010-11-01

    We determined characteristics of Salmonella enterica pulsed-field gel electrophoresis clusters that predict their being solved (i.e., that result in identification of a confirmed outbreak). Clusters were investigated by the Minnesota Department of Health by using a dynamic iterative model. During 2001-2007, a total of 43 (12.5%) of 344 clusters were solved. Clusters of ≥4 isolates were more likely to be solved than clusters of 2 isolates. Clusters in which the first 3 case isolates were received at the Minnesota Department of Health within 7 days were more likely to be solved than were clusters in which the first 3 case isolates were received over a period >14 days. If resources do not permit investigation of all S. enterica pulsed-field gel electrophoresis clusters, investigation of clusters of ≥4 cases and clusters in which the first 3 case isolates were received at a public health laboratory within 7 days may improve outbreak investigations.

  12. CBM progress report 2007

    Energy Technology Data Exchange (ETDEWEB)

    Herrmann, N.; Rami, F.; Roehrich, D.; Stroth, J.; Wessels, J.; Zaitsev, Yu

    2008-02-15

    This report documents the activities within the CBM project in 2007. Significant progress has been made in the optimization of the simulation software, the layout and development of detectors, the design of front-end electronics, and the concepts for data acquisition. The simulation and analysis routines have been completely integrated into the software framework (FAIRoot and CBMroot), and can be used now easily by users outside GSI. A breakthrough has been achieved in the development of fast algorithms for track and vertex reconstruction which have been improved in speed by a factor of 10{sup 5}. These fast routines permit to perform high-statistics simulations for detailed detector layout optimization. Full event reconstruction based on realistic detector properties and particle multiplicities as given by microscopic transport models are routinely used in the feasibility studies. A version of the Silicon Tracking System is now implemented in the simulation software comprising 8 detector layers based on microstrip technology only, including the readout cables, and the mechanical detector structure. The studies of open charm detection have been extended to D{sub s}{sup +} and {lambda}{sub c}, taking into account a realistic layout of the Silicon Pixel Microvertex detector. The identification of electrons has been optimized by improved ring recognition algorithms and transition radiation simulations. The Ring Imaging Cherenkov (RICH) detector has been redesigned, resulting in a reduction by a factor of two in mirror size and number of readout channels without reducing the pion rejection capability. The muon detection system has been optimized with respect to the number of detector layers. The muon simulations take into account detector inefficiencies and a segmentation of the muon chambers into pads according to a nominal occupancy of 5% for central Au+Au collisions. Studies for a dimuon trigger show promising results. Radiation dose simulations using the FLUKA

  13. CBM progress report 2007

    International Nuclear Information System (INIS)

    Herrmann, N.; Rami, F.; Roehrich, D.; Stroth, J.; Wessels, J.; Zaitsev, Yu

    2008-02-01

    This report documents the activities within the CBM project in 2007. Significant progress has been made in the optimization of the simulation software, the layout and development of detectors, the design of front-end electronics, and the concepts for data acquisition. The simulation and analysis routines have been completely integrated into the software framework (FAIRoot and CBMroot), and can be used now easily by users outside GSI. A breakthrough has been achieved in the development of fast algorithms for track and vertex reconstruction which have been improved in speed by a factor of 10 5 . These fast routines permit to perform high-statistics simulations for detailed detector layout optimization. Full event reconstruction based on realistic detector properties and particle multiplicities as given by microscopic transport models are routinely used in the feasibility studies. A version of the Silicon Tracking System is now implemented in the simulation software comprising 8 detector layers based on microstrip technology only, including the readout cables, and the mechanical detector structure. The studies of open charm detection have been extended to D s + and Λ c , taking into account a realistic layout of the Silicon Pixel Microvertex detector. The identification of electrons has been optimized by improved ring recognition algorithms and transition radiation simulations. The Ring Imaging Cherenkov (RICH) detector has been redesigned, resulting in a reduction by a factor of two in mirror size and number of readout channels without reducing the pion rejection capability. The muon detection system has been optimized with respect to the number of detector layers. The muon simulations take into account detector inefficiencies and a segmentation of the muon chambers into pads according to a nominal occupancy of 5% for central Au+Au collisions. Studies for a dimuon trigger show promising results. Radiation dose simulations using the FLUKA transport code have been

  14. 77 FR 123 - Final Reissuance of General NPDES Permits (GP) for Facilities Related to Oil and Gas Extraction

    Science.gov (United States)

    2012-01-03

    ... Administrative Procedure Act (APA), or any other law, to publish general notice of proposed rulemaking.'' The RFA... NPDES general permits are permits, not rulemakings, under the APA and thus not subject to APA rulemaking...

  15. Identification of permit and waste acceptance criteria provisions requiring modification for acceptance of commercial mixed waste

    International Nuclear Information System (INIS)

    1994-03-01

    In October 1990, representatives of States and compact regions requested that the US Department of Energy (DOE) explore an agreement with host States and compact regions under which DOE would accept commercial mixed low-level radioactive waste (LLW) at DOE's own treatment and disposal facilities. A program for DOE management of commercial mixed waste is made potentially more attractive in light of the low commercial mixed waste volumes, high regulatory burdens, public opposition to new disposal sites, and relatively high cost of constructing commercial disposal facilities. Several studies were identified as essential in determining the feasibility of DOE accepting commercial mixed waste for disposal. The purpose of this report is to identify any current or proposed waste acceptance criteria (WAC) or Resource Conservation and Recovery Act (RCRA) provisions that would have to be modified for commercial mixed waste acceptance at specified DOE facilities. Following the introduction, Section 2 of this report (a) provides a background summary of existing and proposed mixed waste disposal facilities at each DOE site, and (b) summarizes the status of any RCRA Part B permit and WAC provisions relating to the disposal of mixed waste, including provisions relating to acceptance of offsite waste. Section 3 provides overall conclusions regarding the current status and permit modifications that must be implemented in order to grant DOE sites authority under their permits to accept commercial mixed waste for disposal. Section 4 contains a list of references

  16. Hanford Waste Vitrification Plant Dangerous Waste Permit Application

    International Nuclear Information System (INIS)

    1991-10-01

    The Hanford Facility currently stores mixed waste, resulting from various processing operations, in underground storage tanks. The Hanford Waste Vitrification Plant will be constructed and operated to process the high-activity fraction of mixed waste stored in these underground tanks. The Hanford Waste Vitrification Plant will solidify pretreated tank waste into a glass product that will be packaged for disposal in a national repository. This Vitrification Plant Dangerous Waste Permit Application, Revision 2, consists of both a Part A and a Part B permit application. An explanation of the Part A revisions, including Revision 4 submitted with this application, is provided at the beginning of the Part A section. The Part B consists of 15 chapters addressing the organization and content of the Part B Checklist prepared by the Washington State Department of Ecology (Ecology 1987)

  17. Waste-to-energy permitting sourcebook

    International Nuclear Information System (INIS)

    Longwell, D.; Wegrecki, A.; Williams, D.

    1992-10-01

    Environmental issues, regulatory processes and approvals important in obtaining a permit to construct and/or operate a waste-to-energy (WTE) facility are identified and discussed. Environmental issues include: (1) air emission levels, their control and potential impacts, (2) ash leachability, treatment, and disposal, (3) potential health risks from emissions, and (4) other issues such as need/benefit and public perception of WTE. Laws, regulations and approvals that can affect project development are identified and listed, and potential regulatory trends are discussed. A general permit acquisition plan is also presented. An analysis of environmental and regulatory data obtained from the literature, regulatory agencies, and specific projects is presented. California and Massachusetts, both with regulations generally more stringent than federal regulations and considered environmentally conservative, were selected for detailed state regulatory review. Two project case histories (Commerce Refuse-to-Energy (RTE) Project in California and SEMASS WTE Project in Massachusetts) were selected to illustrate: (1) how regulations are actually applied to a project, (2) project-specific permit and operating conditions, and (3) project-specific environmental issues. Modern WTE plots employ state-of-the-art air emission control technologies and strategies to reduce air emission is to levels below regulatory requirements and to reduce estimated health risks to within EPA's acceptable risk range. WTE ash leachate can exhibit hazardous waste characteristics, primarily lead and cadmium. However, modern landfills utilize liners and leachate collection systems to prevent infiltration of leachate into the groundwater supply. Modern WTE plants employ dry systems and have zero process wastewater discharge

  18. 77 FR 67055 - Application for a Presidential Permit To Operate and Maintain Pipeline Facilities on the Border...

    Science.gov (United States)

    2012-11-08

    ... of State (DOS) has received from NOVA Chemicals Inc. (``NOVA Inc.'') notice that by way of corporate... Presidential Permit issued to Polysar. NOVA Inc. requests a new Presidential Permit be issued under its name.... anticipates no change in the operations of Lines 16, 18 and 19 relative to those that were authorized by the...

  19. 300 Area TEDF NPDES Permit Compliance Monitoring Plan

    International Nuclear Information System (INIS)

    Loll, C.M.

    1994-01-01

    This monitoring plan describes the activities and methods that will be employed at the 300 Area Treated Effluent Disposal Facility (TEDF) in order to ensure compliance with the National Discharge Elimination System (NPDES) permit. Included in this document are a brief description of the project, the specifics of the sampling effort, including the physical location and frequency of sampling, the support required for sampling, and the Quality Assurance (QA) protocols to be followed in the sampling procedures

  20. 36 CFR 1234.10 - What are the facility requirements for all records storage facilities?

    Science.gov (United States)

    2010-07-01

    ... prevent water leaks and the piping assembly is inspected for potential leaks regularly. If drainage piping... facility must ensure that the roof membrane does not permit water to penetrate the roof. NARA strongly... the exception of fire protection sprinkler piping and storm water roof drainage piping) must not be...

  1. Studies for improvement of regulatory control on the radioactive effluent released from nuclear facilities

    International Nuclear Information System (INIS)

    Cheong, Jae Hak; Park, H. M.; Song, M. C.; Lee, K. H.; Jang, J. K.; Chun, J. K.; Jeong, K. H.

    2005-05-01

    This report contains the second-year results of the research project titled 'Studies for Improvement of Regulatory Control on the Radioactive Effluent Released from Nuclear Facilities' and mainly provides technical and strategic approaches to improve performance of regulatory control on the gaseous effluent released from domestic nuclear facilities. The main result contained here includes overview and technical bases of radioactive gaseous effluent control (Chapter 1), reconsideration of the sensitivity requirements for measurement of radioactivity in gaseous effluent sample (Chapter 2), uncertainty analysis of the calculated radioactivity in gaseous effluent (Chapter 3), and improvement of quantification method of noble gas releases (Chapter 4). In addition, analysis of the impact due to combined sampling of particulate from multiple release points (Chapter 5), comparison of domestic nuclear reactors gaseous effluent data to foreign PWRs (Chapter 6), standardized sampling technique for collection of gaseous tritium (Chapter 7), and application of Xe-133 equivalent concept to gaseous effluent control (Chapter 8) are also provided. As a whole, this report provides a generic approach to improve the performance of regulatory control on the gaseous effluent. Therefore, actual enforcement of the recommendations should be preceded by establishment of a series of action plans reflecting on the site- and facility-specific design and operational features

  2. A standards-based approach to quality improvement for HIV services at Zambia Defence Force facilities: results and lessons learned.

    Science.gov (United States)

    Kols, Adrienne; Kim, Young-Mi; Bazant, Eva; Necochea, Edgar; Banda, Joseph; Stender, Stacie

    2015-07-01

    The Zambia Defence Force adopted the Standards-Based Management and Recognition approach to improve the quality of the HIV-related services at its health facilities. This quality improvement intervention relies on comprehensive, detailed assessment tools to communicate and verify adherence to national standards of care, and to test and implement changes to improve performance. A quasi-experimental evaluation of the intervention was conducted at eight Zambia Defence Force primary health facilities (four facilities implemented the intervention and four did not). Data from three previous analyses are combined to assess the effect of Standards-Based Management and Recognition on three domains: facility readiness to provide services; observed provider performance during antiretroviral therapy (ART) and antenatal care consultations; and provider perceptions of the work environment. Facility readiness scores for ART improved on four of the eight standards at intervention sites, and one standard at comparison sites. Facility readiness scores for prevention of mother-to-child transmission (PMTCT) of HIV increased by 15 percentage points at intervention sites and 7 percentage points at comparison sites. Provider performance improved significantly at intervention sites for both ART services (from 58 to 84%; P improved at intervention sites and declined at comparison sites; differences in trends between study groups were significant for eight items. A standards-based approach to quality improvement proved effective in supporting healthcare managers and providers to deliver ART and PMTCT services in accordance with evidence-based standards in a health system suffering from staff shortages.

  3. Conceptual Design Report: Nevada Test Site Mixed Waste Disposal Facility Project

    International Nuclear Information System (INIS)

    2009-01-01

    Environmental cleanup of contaminated nuclear weapons manufacturing and test sites generates radioactive waste that must be disposed. Site cleanup activities throughout the U.S. Department of Energy (DOE) complex are projected to continue through 2050. Some of this waste is mixed waste (MW), containing both hazardous and radioactive components. In addition, there is a need for MW disposal from other mission activities. The Waste Management Programmatic Environmental Impact Statement Record of Decision designates the Nevada Test Site (NTS) as a regional MW disposal site. The NTS has a facility that is permitted to dispose of onsite- and offsite-generated MW until November 30, 2010. There is not a DOE waste management facility that is currently permitted to dispose of offsite-generated MW after 2010, jeopardizing the DOE environmental cleanup mission and other MW-generating mission-related activities. A mission needs document (CD-0) has been prepared for a newly permitted MW disposal facility at the NTS that would provide the needed capability to support DOE's environmental cleanup mission and other MW-generating mission-related activities. This report presents a conceptual engineering design for a MW facility that is fully compliant with Resource Conservation and Recovery Act (RCRA) and DOE O 435.1, 'Radioactive Waste Management'. The facility, which will be located within the Area 5 Radioactive Waste Management Site (RWMS) at the NTS, will provide an approximately 20,000-cubic yard waste disposal capacity. The facility will be licensed by the Nevada Division of Environmental Protection (NDEP)

  4. Improving regulatory effectiveness in Federal/State siting actions. State perspectives on energy facility siting

    International Nuclear Information System (INIS)

    Stevens, D.W.; Helminski, E.L.

    1978-03-01

    The National Governors' Association, through its Committee on Natural Resources and Environmental Management, has been concerned with the growing administrative difficulties, both at the federal and state levels, of certifying sites for new major energy facilities. This concern led, early in 1977, to the creation of a Subcommittee on Energy Facility Siting to comprehensively analyze current conditions and determine how basic improvements might be made to the process. The report is meant to further clarify the issues that confront States and the Federal government in the siting of energy facilities

  5. Areva 2007 results: accelerated growth and significantly improved profitability

    International Nuclear Information System (INIS)

    2008-02-01

    The AREVA group recorded accelerated growth and increased profitability in 2007, meeting both of its objectives for the year. The group made strategic inroads in fast growing markets. AREVA's integrated model met with record success in China, where GGNPC acquired two EPR nuclear islands in a combined order including both the reactors and the fuel, and the creation of a joint venture in engineering. Its T and D division was awarded the largest contract of its history in Qatar, making it the leader in a region where T and D was not even present a few years ago. For more than three years, AREVA has built up its capacity to meet surging demand in the nuclear power and T and D markets through an active policy of research and development and by capitalizing on the diversity and strength of its partnerships. Areva hired 8,600 people in 2006 and 11,500 people in 2007; this represents an investment in recruitment, training and integration of approximately euro 200 million per year. For 2008, the group foresees a further increase in its backlog, sales revenue and operating income. The Areva Group financial statements for 2007 are summarized below: - Backlog: euro 39.8 billion, up 55%; - Sales revenue: euro 11.9 billion, up 9.8% (up 10.4% like-for-like); - Operating income: euro 751 million, i.e. 6.3% operating margin, up 2.6 points compared with 2006; - Net income attributable to equity holders of the parent: euro 743 million (euro 20.95 per share), up from euro 649 million in 2006 (euro 18.31 per share); - Net debt: euro 1.954 billion, linked to the acquisition of UraMin; - Dividend: euro 6.77, to be proposed to the Annual General Meeting of Shareholders convening on April 17, 2008

  6. Improving of spent fuel monitoring in condition of Slovak wet interim spent fuel storage facility

    International Nuclear Information System (INIS)

    Miklos, M.; Krsjak, V.; Bozik, M.; Vasina, D.

    2008-01-01

    Monitoring of WWER fuel assemblies condition in Slovakia is presented in the paper. The leak tightness results of fuel assemblies used in Slovak WWER units in last 20 years are analyzed. Good experiences with the 'Sipping system' are described. The Slovak wet interim spent fuel storage facility in NPP Jaslovske Bohunice was build and put in operation in 1986. Since 1999, leak tests of WWER-440 fuel assemblies are provided by special leak tightness detection system 'Sipping in Pool' delivered by Framatome-ANP facility with external heating for the precise detection of active specimens. Another system for monitoring of fuel assemblies condition was implemented in December 2006 under the name 'SVYPP-440'. First non-active tests started at February 2007 and are described in the paper. Although those systems seems to be very effective, the detection time of all fuel assemblies in one storage pool is too long (several months). Therefore, a new 'on-line' detection system, based on new sorbent KNiFC-PAN for effective 134 Cs and 137 Cs activity was developed. This sorbent was compared with another type of sorbent NIFSIL and results are presented. The design of this detection system and its possible application in the Slovak wet spent fuel storage facility is discussed. For completeness, the initial results of the new system are also presented. (authors)

  7. Neutron data experiments for transmutation. Annual Report 2006/2007

    International Nuclear Information System (INIS)

    Blomgren, J.; Andersson, P.; Bevilacqua, R.; Nilsson, L.; Pomp, S.; Simutkin, V.; Oehrn, A.; Oesterlund, M.

    2007-10-01

    The project NEXT, Neutron data Experiments for Transmutation, is performed within the nuclear reactions group of the Department of Neutron Research, Uppsala University. The activities of the group are directed towards experimental studies of nuclear reaction probabilities of importance for various applications, like transmutation of nuclear waste, biomedical effects and electronics reliability. The experimental work is primarily undertaken at the The Svedberg Laboratory (TSL) in Uppsala, where the group is operating two world-unique instruments, MEDLEY and SCANDAL. Highlights from the past year: The TSL neutron beam facility and the MEDLEY detector system have been upgraded. Funding for a major upgrade of the SCANDAL facility has been approved, and practical work has been initiated. Three new PhD students have been accepted. The Uppsala group contributed twelve accepted publications at the International Conference on Nuclear Data for Science and Technology, Nice, France, April 22-27, 2007. The EU project CANDIDE (Coordination Action on Nuclear Data for Industrial Development in Europe), coordinated by Jan Blomgren, started January 1, 2007. The EU project EFNUDAT (European Facilities for Nuclear Data research), partly coordinated by Jan Blomgren, started November 1, 2006. Nuclear power education has reached all-time high at Uppsala University. A contract with KSU (Nuclear Training and Safety Centre) on financing the increased volume of teaching for industry needs has been signed

  8. Neutron data experiments for transmutation. Annual Report 2006/2007

    Energy Technology Data Exchange (ETDEWEB)

    Blomgren, J.; Andersson, P.; Bevilacqua, R.; Nilsson, L.; Pomp, S.; Simutkin, V.; Oehrn, A.; Oesterlund, M. (Uppsala Univ. (SE). Dept. of Neutron Research)

    2007-10-15

    The project NEXT, Neutron data Experiments for Transmutation, is performed within the nuclear reactions group of the Department of Neutron Research, Uppsala University. The activities of the group are directed towards experimental studies of nuclear reaction probabilities of importance for various applications, like transmutation of nuclear waste, biomedical effects and electronics reliability. The experimental work is primarily undertaken at the The Svedberg Laboratory (TSL) in Uppsala, where the group is operating two world-unique instruments, MEDLEY and SCANDAL. Highlights from the past year: The TSL neutron beam facility and the MEDLEY detector system have been upgraded. Funding for a major upgrade of the SCANDAL facility has been approved, and practical work has been initiated. Three new PhD students have been accepted. The Uppsala group contributed twelve accepted publications at the International Conference on Nuclear Data for Science and Technology, Nice, France, April 22-27, 2007. The EU project CANDIDE (Coordination Action on Nuclear Data for Industrial Development in Europe), coordinated by Jan Blomgren, started January 1, 2007. The EU project EFNUDAT (European Facilities for Nuclear Data research), partly coordinated by Jan Blomgren, started November 1, 2006. Nuclear power education has reached all-time high at Uppsala University. A contract with KSU (Nuclear Training and Safety Centre) on financing the increased volume of teaching for industry needs has been signed

  9. ANGKA KEMATIAN DI BERBAGAI PROPINSI DI INDONESIA (DATA RISKESDAS 2007

    Directory of Open Access Journals (Sweden)

    Joko Irianto

    2012-11-01

    Full Text Available Mortality rate is sensitive indicator for evaluation of health program. The mortality data could befound by many methods, one of them is by using Riskesdas data 2007. Thru the Riskesdas mortality data was collected from households with the period of one year before the Riskesdas implementation. Mortality rate could be counted by using indirect method thru child still live and died child by categories of mother age stated in Susenas data 2007. By direct method, it can be stated that crude death rate of Indonesia in general is 4.6 per mil, 5.3 per mil for men and 3.9 for women, then, infant mortality rate is 22 per mil. By using indirect method, it can be found that mortality rate for child under five year-old is 41 per mil. The finding of this analysis: there is linier causal between crude death rate and ratio of public health center by 100,000 people, but is not significant by hospital, medics and non medics. Variation of mortality rate by provinces can't be described by ratio health facility, but increasing the ratio of public health center by population is to improve reporting event of mortality. Keywords: Crude death rate, infant mortality rate, mortality rate of child under five years

  10. Air quality permits in Texas and New Mexico

    International Nuclear Information System (INIS)

    Fusselman, D.K.; Hofmann, J.E.

    1991-01-01

    Permitting gas processing equipment ranges from fairly simple procedures under the Texas Air Control Board (TACB) Standard Exemption List and the New Mexico Environmental Improvement Division (NMEID) Registration Regulations to an extremely complicated procedure requiring a federal Prevention of Significant Deterioration (PSD) and/or non-attainment review. The following topics relating to obtaining air permits for gas plants will be addressed in this paper: Type of permit/exemption necessary for construction, Specific permit/exemption requirements, New Source Performance Standards (NSPS) Subparts KKK, LLL, GG, K, Ka and Kb, Potential effects of the Federal Clean Air Act Amendments (FCAA). This paper only addresses specific permitting concerns and requirements that apply to the natural gas production industry. The same requirements apply to other industries, with possible additional requirements of National Emission Standards for Hazardous Air Pollutants (NESHAP), NSPS other than Subparts KKK, LLL, GG, K, Ka and Kb, and non-attainment review for pollutants other than ozone

  11. Continuous energy cross section library for MCNP/MCNPX based on JENDL high energy file 2007. FXJH7

    International Nuclear Information System (INIS)

    Sasa, Toshinobu; Sugawara, Takanori; Fukahori, Tokio; Kosako, Kazuaki

    2008-11-01

    The latest JENDL High Energy File (JENDL/HE) was released in 2007 to respond the requirements of reaction data in high energy range up to several GeV to design accelerator facilities such as accelerator-driven systems and research complex like J-PARC. To apply the JENDL/HE-2007 file to the design study, the cross section library of FXJH7 series was constructed from the JENDL/HE file for the calculation using MCNP and MCNPX codes which are widely used in the field of nuclear reactors, fusion reactors, accelerator facilities, medical applications, and so on. In this report, the outline of the JENDL/HE-2007 file, modification of nuclear data processing code NJOY99, construction of FXJH7 library and test calculations for shielding and eigenvalue analyses are summarized. (author)

  12. Assisted Living Facilities - CARE_LONG_TERM_FACILITIES_ISDH_IN: Residential Care Facilities, Nursing Homes, and Hospices in Indiana in 2007 (Indiana State Department of Health, Point Shapefile)

    Data.gov (United States)

    NSGIC State | GIS Inventory — CARE_LONG_TERM_FACILITIES_ISDH_IN is a point shapefile showing the locations of 86 residential care facilities, 525 long-term care facilities (nursing homes), and 81...

  13. Understanding Excess Emissions from Industrial Facilities: Evidence from Texas.

    Science.gov (United States)

    Zirogiannis, Nikolaos; Hollingsworth, Alex J; Konisky, David M

    2018-03-06

    We analyze excess emissions from industrial facilities in Texas using data from the Texas Commission on Environmental Quality. Emissions are characterized as excess if they are beyond a facility's permitted levels and if they occur during startups, shutdowns, or malfunctions. We provide summary data on both the pollutants most often emitted as excess emissions and the industrial sectors and facilities responsible for those emissions. Excess emissions often represent a substantial share of a facility's routine (or permitted) emissions. We find that while excess emissions events are frequent, the majority of excess emissions are emitted by the largest events. That is, the sum of emissions in the 96-100th percentile is often several orders of magnitude larger than the remaining excess emissions (i.e., the sum of emissions below the 95th percentile). Thus, the majority of events emit a small amount of pollution relative to the total amount emitted. In addition, a small group of high emitting facilities in the most polluting industrial sectors are responsible for the vast majority of excess emissions. Using an integrated assessment model, we estimate that the health damages in Texas from excess emissions are approximately $150 million annually.

  14. Status of spent fuel storage facilities in Switzerland

    International Nuclear Information System (INIS)

    Beyeler, P.C.; Lutz, H.R.; Heesen, W. von

    1999-01-01

    Planning of a dry spent fuel storage facility in Switzerland started already 15 years ago. The first site considered for a central interim storage facility was the cavern of the decommissioned pilot nuclear plant at Lucens in the French-speaking part of Switzerland. This project was terminated in the late eighties because of lack of public acceptance. The necessary acceptance was found in the small town of Wuerenlingen which has hosted for many years the Swiss Reactor Research Centre. The new project consists of centralised interim storage facilities for all types of radioactive waste plus a hot cell and a conditioning and incinerating facility. It represents a so-called integrated storage solution. In 1990, the new company 'ZWILAG Zwischenlager Wuerenlingen AG' (ZWILAG) was founded and the licensing procedures according to the Swiss Atomic law were initiated. On August 26, 1996 ZWILAG got the permit for construction of the whole facility including the operating permit for the storage facilities. End of construction and commissioning are scheduled for autumn 1999. The nuclear power station Beznau started planning a low level waste and spent fuel storage facility on its own, because in 1990 its management thought that by 1997 the first high active waste from the reprocessing facilities in France would have to be taken back. This facility at the Beznau site, called ZWIBEZ, was licensed according to a shorter procedure so its construction was finished by 1997. The two facilities for high level waste and spent fuel provide space for a total of 278 casks, which is sufficient for the waste and spent fuel of the four Swiss nuclear power stations including their life extension programme. (author)

  15. BARC-TIFR Pelletron Linac facility

    International Nuclear Information System (INIS)

    Gore, J.A.; Gupta, A.K.; Saxena, A.

    2017-01-01

    The Pelletron Accelerator, set up as a collaborative project between the Bhabha Atomic Research Centre and the Tata Institute of Fundamental Research, has been serving as the workhorse for the heavy ion accelerator based research in India since its commissioning in December 30, 1988. The facility was augmented with an indigenously developed superconducting Linac booster to enhance the energy of the Pelletron accelerated beams and was fully commissioned on November 28, 2007. The augmented facility is renamed as Pelletron Linac facility (PLF). While the PLF is predominantly utilized by the experimental users from BARC and TIFR, the users include researchers from other research institutions and universities within India and abroad

  16. Amputation Surgery in a Secondary Healthcare Facility in Nigeria ...

    African Journals Online (AJOL)

    ... our experience in amputation surgery over a ten – year period in a secondary healthcare facility in sub- Saharan Africa. A retrospective study of 117 patients that underwent amputation in the facility between January 1998 and December 2007. Trauma remains the commonest indication for amputation in our environment.

  17. RADON-type disposal facility safety case for the co-ordinated research project on improvement of safety assessment methodologies for near surface radioactive waste disposal facilities (ISAM)

    International Nuclear Information System (INIS)

    Guskov, A.; Batanjieva, B.; Kozak, M.W.; Torres-Vidal, C.

    2002-01-01

    The ISAM safety assessment methodology was applied to RADON-type facilities. The assessments conducted through the ISAM project were among the first conducted for these kinds of facilities. These assessments are anticipated to lead to significantly improved levels of safety in countries with such facilities. Experience gained though this RADON-type Safety Case was already used in Russia while developing national regulatory documents. (author)

  18. Loomakasvatus, 2007 = Livestock farming, 2007 / Tiiu Tamm

    Index Scriptorium Estoniae

    Tamm, Tiiu

    2007-01-01

    2007. aastal tapeti ning müüdi tapaks 105 000 tonni loomi ja linde, toodeti 689 700 tonni piima ning 155,8 miljonit muna. Diagramm. Tabelid. Vt. samas: Loomade ja piima kokkuost, 2007 = Purchase of livestock and milk, 2007

  19. Annual Report 2007 - ABACC - Brazilian-Argentine Agency for Accounting and Control of Nuclear Materials

    International Nuclear Information System (INIS)

    2007-01-01

    This document reports activities during the year 2007 related to: technical activities as application of safeguards; management of the Quadripartite Agreement and the SCCC - Common System for Accounting and Control of Nuclear Materials; training; technical cooperation; outlook for 2008 and; institutional, administrative and financial activities; technical glossary; list of brazilian facilities; list of argentine facilities and a list of institution of nuclear area

  20. 78 FR 17661 - Proposed Reissuance of a General NPDES Permit for Oil and Gas Exploration Facilities in the...

    Science.gov (United States)

    2013-03-22

    ...., whichever is earlier. Hearing statements may be provided orally or in written format. Commenters providing... Administrative Procedure Act (APA), or any other law, to publish general notice of proposed rulemaking.'' The RFA... NPDES general permits are permits, not rulemakings, under the APA and thus not subject to APA rulemaking...

  1. Stormwater Pollution Prevention Plan - TA-60 Material Recycling Facility

    Energy Technology Data Exchange (ETDEWEB)

    Sandoval, Leonard Frank [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2018-01-31

    This Storm Water Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activity (U.S. EPA, June 2015) issued by the U.S. Environmental Protection Agency (EPA) for the National Pollutant Discharge Elimination System (NPDES) and using the industry specific permit requirements for Sector P-Land Transportation and Warehousing as a guide. This SWPPP applies to discharges of stormwater from the operational areas of the TA- 60 Material Recycling Facility at Los Alamos National Laboratory. Los Alamos National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Los Alamos National Security, LLC (LANS). Throughout this document, the term “facility” refers to the TA-60 Material Recycling Facility. The current permit expires at midnight on June 4, 2020.

  2. Chemical Facility Security: Regulation and Issues for Congress

    National Research Council Canada - National Science Library

    Shea, Dana A; Tatelman, Todd B

    2007-01-01

    The Department of Homeland Security (DHS) has proposed security regulations for chemical facilities, implementing the statutory authority granted in the Homeland Security Appropriations Act, 2007 (P.L...

  3. Final report of the HFIR [High Flux Isotope Reactor] irradiation facilities improvement project

    International Nuclear Information System (INIS)

    Montgomery, B.H.; Thoms, K.R.; West, C.D.

    1987-09-01

    The High-Flux Isotope Reactor (HFIR) has outstanding neutronics characteristics for materials irradiation, but some relatively minor aspects of its mechanical design severely limited its usefulness for that purpose. In particular, though the flux trap region in the center of the annular fuel elements has a very high neutron flux, it had no provision for instrumentation access to irradiation capsules. The irradiation positions in the beryllium reflector outside the fuel elements also have a high flux; however, although instrumented, they were too small and too few to replace the facilities of a materials testing reactor. To address these drawbacks, the HFIR Irradiation Facilities Improvement Project consisted of modifications to the reactor vessel cover, internal structures, and reflector. Two instrumented facilities were provided in the flux trap region, and the number of materials irradiation positions in the removable beryllium (RB) was increased from four to eight, each with almost twice the available experimental space of the previous ones. The instrumented target facilities were completed in August 1986, and the RB facilities were completed in June 1987

  4. 33 CFR 126.15 - What conditions must a designated waterfront facility meet?

    Science.gov (United States)

    2010-07-01

    ..., access to the facility must be limited to— (i) Personnel working on the facility or vessel; (ii) Delivery... meet the requirements of NFPA 307, chapter 9. (10) Smoking. Smoking is allowed on the facility where permitted under State or local law. Signs must be posted marking authorized smoking areas. “No Smoking...

  5. Improvement of management systems for nuclear facilities

    International Nuclear Information System (INIS)

    2005-01-01

    The area of Quality Management/ Quality Assurance has been changed dramatically over the past years. The nuclear facilities moved from the 'traditional' Quality Assurance approach towards Quality Management Systems, and later a new concept of Integrated Management Systems was introduced. The IAEA is developing a new set of Standards on Integrated Management Systems, which will replace the current 50-C-Q/SG-Q1-Q14 Code. The new set of document will require the integration of all management areas into one coherent management system. The new set of standards on Management Systems promotes the concept of the Integrated Management Systems. Based on new set a big number of documents are under preparation. These documents will address the current issues in the management systems area, e.g. Management of Change, Continuous Improvement, Self-assessment, and Attributes of effective management, etc. Currently NPES is providing a number of TC projects and Extra Budgetary Programmes to assist Member States in this area. The new Standards on Management Systems will be published in 2006. A number of Regulatory bodies already indicated that they would take the new Management System Standards as a basis for the national regulation. This fact will motivate a considerable change in the management of nuclear utilities, requiring a new approach. This activity is suitable for all IAEA Members States with large or limited nuclear capabilities. The service is directed to provide assistance for the management of all organizations carrying on or regulating nuclear activities and facilities

  6. Mesothelioma in Qingdao, PRC (2000 - 2007)

    Science.gov (United States)

    Frank, Arthur L.; Zengchang, Pang; Huaqiang, Zhang; Yun, Zhang

    2009-02-01

    The city of Qingdao, PRC has been the site of two asbestos product facilities that operated for almost fifty years, as well as a shipyard. Because of a new computerized data collection system for death certificates, almost all 48,000 yearly deaths from a population base of 7.5 million are now recorded with cause of death and "usual occupation". All mesothelioma deaths from 2000 through 2007 are reviewed and the unusual finding is that of a predominance of cases in females. The issues of competing causes of death and potential underreporting are discussed.

  7. Design of the PRIDE Facility

    International Nuclear Information System (INIS)

    You, Gil Sung; Choung, Won Myung; Lee, Eun Pyo; Cho, Il Je; Kwon, Kie Chan; Hong, Dong Hee; Lee, Won Kyung; Ku, Jeong Hoe

    2009-01-01

    From 2007, KAERI is developing a PyRoprocess Integrated inactive DEmonstration facility (the PRIDE facility). The maximum annual treatment capacity of this facility will be a 10 ton-HM. The process will use a natural uranium feed material or a natural uranium mixed with some surrogate material for a simulation of a spent fuel. KAERI has also another plan to construct a demonstration facility which can treat a real spent fuel by pyroprocessing. This facility is called by ESPF, Engineering Scale Pyroprocess Facility. The ESPF will have the same treatment capability of spent fuel with the PRIDE facility. The only difference between the PRIDE and the ESPF is a radiation shielding capability. From the PRIDE facility designing works and demonstration with a simulated spent fuel after construction, it will be able to obtain the basic facility requirements, remote operability, interrelation properties between process equipment for designing of the ESPF. The flow sheet of the PRIDE processes is composed of five main processes, such as a decladding and voloxidation, an electro-reduction, an electrorefining, an electro-winning, and a salt waste treatment. The final products from the PRIDE facility are a simulated TRU metal and U metal ingot

  8. Areva. 2007 figures economic, social, societal and environmental data

    International Nuclear Information System (INIS)

    2007-01-01

    This document presents the 2007 economic, social, societal and environmental data of the Areva Group. Content: 1 - Improvement initiative: Continuous improvement, Innovation; 2 - Financial performance: 2007 results; 3 - Commitment to employees: Stakeholder relations, Health and safety, Radiation protection, Radiological impacts, Technological risks, Workforce, Workforce and training; 4 - Environment: Water, Energy, Gaseous releases, Liquid releases, Conventional waste, Radioactive waste; 5 - Reporting and performance indicators: Reporting methodology, Auditors' report, Social indicators, Environmental indicators

  9. 1325-N Liquid Waste Disposal Facility Supplemental Information to the Hanford Facility Contingency Plan (DOE/RL-93-75)

    International Nuclear Information System (INIS)

    Edens, V.G.

    1998-03-01

    The 1325-N Liquid Waste Disposal Facility located at the 100-N Area of the Hanford Site started receiving part of the N Reactor liquid radioactive effluent flow in 1983. In September 1985, the 1325-N Facility became the primary liquid waste disposal system for the N Reactor. The facility is located approximately 60 feet above and 2000 feet east of the shore of the Columbia River. Waste stream discharges were ceased in April 1991.Specific information on types of waste discharged to 1325-N are contained within the Part A, Form 3, Permit application of this unit

  10. State Waste Discharge Permit application, 183-N Backwash Discharge Pond

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173--216 (or 173--218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE91NM-177 requires a series of permitting activities for liquid effluent discharges. Liquid effluents on the Hanford Site have been classified as Phase I, Phase II, and Miscellaneous Streams. The Consent Order No. DE91NM-177 establishes milestones for State Waste Discharge Permit application submittals for all Phase I and Phase II streams, as well as the following 11 Miscellaneous Streams as identified in Table 4 of the Consent Order No. DE91NM-177.

  11. 2010 Annual Wastewater Reuse Report for the Idaho National Laboratory Site's Central Facilities Area Sewage Treatment Plant

    Energy Technology Data Exchange (ETDEWEB)

    Mike lewis

    2011-02-01

    This report describes conditions, as required by the state of Idaho Wastewater Reuse Permit (#LA-000141-03), for the wastewater land application site at Idaho National Laboratory Site’s Central Facilities Area Sewage Treatment Plant from November 1, 2009, through October 31, 2010. The report contains the following information: • Site description • Facility and system description • Permit required monitoring data and loading rates • Status of special compliance conditions • Discussion of the facility’s environmental impacts. During the 2010 permit year, approximately 2.2 million gallons of treated wastewater was land-applied to the irrigation area at Central Facilities Area Sewage Treatment plant.

  12. May compact storage facilities be licensed

    International Nuclear Information System (INIS)

    Gleim, A.; Winter, G.

    1980-01-01

    The authors examine as potential statements fo fact for licensing so-called compact storage facilities for spent fuel elements Sec. 6 to 9c of the German Atomic Energy Act and Sec. 4 of the German Radiation Protection Ordinance. They find that none of these provisions were applicable to compact stroage facilities. In particular, the storage of spent fuel elements was no storage of nuclear fuels licensable under Sec. 6 of the Atomic Energy Act, because Sec. 6 did not cover spent fuel elements. Also in the other wording of the Atomic Energy Act there was no provision, which could be used as a statement of fact for licensing compact storage facilities. Such facilities could not be licensed and, for that reason, were not permitted. (IVR) [de

  13. Safety of laboratories, plants, facilities being dismantled, waste processing, interim storage and disposal facilities. Lessons learned from events reported in 2009 and 2010

    International Nuclear Information System (INIS)

    2013-01-01

    This report presents the cross-disciplinary analysis performed by IRSN relating to significant events reported to the French Nuclear Safety Authority (ASN) during 2009 - 2010 for LUDD-type facilities (laboratories, plants, facilities being dismantled, and waste processing, interim storage and disposal facilities). It constitutes a follow-up to DSU Report 215 published in December 2009, relating to events reported to ASN during 2005 to 2008. The main developments observed since the analysis presented in that report have been underlined here, in order to highlight improvements, opportunities for progress and the main areas requiring careful attention. The present report is a continuation of DSU Report 215. Without claiming to be exhaustive, it presents lessons from IRSN's cross-disciplinary analysis of events reported to ASN during 2009 and 2010 at LUDD facilities while highlighting major changes from the previous analysis in order to underline improvements, areas where progress has been made, and main points for monitoring. The report has four sections: - the first gives a brief introduction to the various kinds of LUDD facilities and highlights changes with DSU Report 215; - the second provides a summary of major trends involving events reported to ASN during 2007-2010 as well as overall results of consequences of events reported during 2009 and 2010 for workers, the general public and the environment; - the third section gives a cross-disciplinary analysis of significant events reported during 2009 and 2010, performed from two complementary angles (analysis of main types of events grouped by type of risk and analysis of generic causes). Main changes from the analysis given in DSU Report 215 are considered in detail; - the last section describes selected significant events that occurred in 2009 and 2010 in order to illustrate the cross-disciplinary analysis with concrete examples. IRSN will publish this type of report periodically in coming years in order to

  14. Integrated safeguards and facility design and operations

    International Nuclear Information System (INIS)

    Tape, J.W.; Coulter, C.A.; Markin, J.T.; Thomas, K.E.

    1987-01-01

    The integration of safeguards functions to deter or detect unauthorized actions by an insider requires the careful communication and management of safeguards-relevant information on a timely basis. The traditional separation of safeguards functions into physical protection, materials control, and materials accounting often inhibits important information flows. Redefining the major safeguards functions as authorization, enforcement, and verification, and careful attention to management of information from acquisition to organization, to analysis, to decision making can result in effective safeguards integration. The careful inclusion of these ideas in facility designs and operations will lead to cost-effective safeguards systems. The safeguards authorization function defines, for example, personnel access requirements, processing activities, and materials movements/locations that are permitted to accomplish the mission of the facility. Minimizing the number of authorized personnel, limiting the processing flexibility, and maintaining up-to-date flow sheets will facilitate the detection of unauthorized activities. Enforcement of the authorized activities can be achieved in part through the use of barriers, access control systems, process sensors, and health and safety information. Consideration of safeguards requirements during facility design can improve the enforcement function. Verification includes the familiar materials accounting activities as well as auditing and testing of the other functions

  15. Does Nursing Facility Use of Habilitation Therapy Improve Performance on Quality Measures?

    Science.gov (United States)

    Fitzler, Sandra; Raia, Paul; Buckley, Fredrick O; Wang, Mei

    2016-12-01

    The purpose of the project, Centers for Medicare & Medicaid Services (CMS) Innovation study, was to evaluate the impact on 12 quality measures including 10 Minimum Data Set (MDS) publicly reported measures and 2 nursing home process measures using habilitation therapy techniques and a behavior team to manage dementia-related behaviors. A prospective design was used to assess the changes in the measures. A total of 30 Massachusetts nursing homes participated in the project over a 12-month period. Project participation required the creation of an interdisciplinary behavior team, habilitation therapy training, facility visit by the program coordinator, attendance at bimonthly support and sharing calls, and monthly collection of process measure data. Participating facilities showed improvement in 9 of the 12 reported measures. Findings indicate potential quality improvement in having nursing homes learn habilitation therapy techniques and know how to use the interdisciplinary team to manage problem behaviors. © The Author(s) 2016.

  16. Improving Quality of Care in Primary Health-Care Facilities in Rural Nigeria

    OpenAIRE

    Ugo, Okoli; Ezinne, Eze-Ajoku; Modupe, Oludipe; Nicole, Spieker; Winifred, Ekezie; Kelechi, Ohiri

    2016-01-01

    Background: Nigeria has a high population density but a weak health-care system. To improve the quality of care, 3 organizations carried out a quality improvement pilot intervention at the primary health-care level in selected rural areas. Objective: To assess the change in quality of care in primary health-care facilities in rural Nigeria following the provision of technical governance support and to document the successes and challenges encountered. Method: A total of 6 states were selected...

  17. Access to major overseas research facilities

    International Nuclear Information System (INIS)

    Bolderman, J. W.

    1997-01-01

    This paper will describe four schemes which have been established to permit Australian researchers access to some of the most advanced overseas research facilities. These include, access to Major Research Facilities Program, the Australian National Beamline Facility at the Photon Factory, the Australian Synchrotron Research Program and the ISIS Agreement. The details of each of these programs is discussed and the statistics on the scientific output provided. All programs are managed on behalf of the Department of Industry, Science and Tourism by the Australian Nuclear Science and Technology Organisation. One hundred and thirteen senior scientists plus forty, one postgraduate, students were supported through these schemes during the 1996-1997 financial year

  18. Facile surface modification of silicone rubber with zwitterionic polymers for improving blood compatibility

    International Nuclear Information System (INIS)

    Liu, Pingsheng; Chen, Qiang; Yuan, Bo; Chen, Mengzhou; Wu, Shishan; Lin, Sicong; Shen, Jian

    2013-01-01

    A facile approach to modify silicone rubber (SR) membrane for improving the blood compatibility was investigated. The hydrophobic SR surface was firstly activated by air plasma, after which an initiator was immobilized on the activated surface for atom transfer radical polymerization (ATRP). Three zwitterionic polymers were then grafted from SR membrane via surface-initiated atom transfer radical polymerization (SI-ATRP). The surface composition, wettability, and morphology of the membranes before and after modification were characterized by X-ray photoelectron spectroscopy (XPS), static water contact angle (WCA) measurement, and atomic force microscopy (AFM). Results showed that zwitterionic polymers were successfully grafted from SR surfaces, which remarkably improved the wettability of the SR surface. The blood compatibility of the membranes was evaluated by protein adsorption and platelet adhesion tests in vitro. As observed, all the zwitterionic polymer modified surfaces have improved resistance to nonspecific protein adsorption and have excellent resistance to platelet adhesion, showing significantly improved blood compatibility. This work should inspire many creative uses of SR based materials for biomedical applications such as vessel, catheter, and microfluidics. Highlights: • Facile surface modification of silicone rubber with functional brushes • Modified SR surfaces have improved resistance to nonspecific protein adsorption. • Modified SR surfaces have excellent resistance to platelet adhesion. • Zwitteironic surface significant improvement in blood compatibility • Could inspire many creative uses of SR based materials for biomedical

  19. Facile surface modification of silicone rubber with zwitterionic polymers for improving blood compatibility

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Pingsheng [School of Chemistry and Chemical Engineering, Nanjing University, Nanjing 210093 (China); Chen, Qiang, E-mail: chem100@nju.edu.cn [School of Chemistry and Chemical Engineering, Nanjing University, Nanjing 210093 (China); High Technology Research Institute of Nanjing University, Changzhou 213164 (China); Yuan, Bo; Chen, Mengzhou; Wu, Shishan; Lin, Sicong [School of Chemistry and Chemical Engineering, Nanjing University, Nanjing 210093 (China); Shen, Jian, E-mail: shenj1957@yahoo.com.cn [School of Chemistry and Chemical Engineering, Nanjing University, Nanjing 210093 (China)

    2013-10-15

    A facile approach to modify silicone rubber (SR) membrane for improving the blood compatibility was investigated. The hydrophobic SR surface was firstly activated by air plasma, after which an initiator was immobilized on the activated surface for atom transfer radical polymerization (ATRP). Three zwitterionic polymers were then grafted from SR membrane via surface-initiated atom transfer radical polymerization (SI-ATRP). The surface composition, wettability, and morphology of the membranes before and after modification were characterized by X-ray photoelectron spectroscopy (XPS), static water contact angle (WCA) measurement, and atomic force microscopy (AFM). Results showed that zwitterionic polymers were successfully grafted from SR surfaces, which remarkably improved the wettability of the SR surface. The blood compatibility of the membranes was evaluated by protein adsorption and platelet adhesion tests in vitro. As observed, all the zwitterionic polymer modified surfaces have improved resistance to nonspecific protein adsorption and have excellent resistance to platelet adhesion, showing significantly improved blood compatibility. This work should inspire many creative uses of SR based materials for biomedical applications such as vessel, catheter, and microfluidics. Highlights: • Facile surface modification of silicone rubber with functional brushes • Modified SR surfaces have improved resistance to nonspecific protein adsorption. • Modified SR surfaces have excellent resistance to platelet adhesion. • Zwitteironic surface significant improvement in blood compatibility • Could inspire many creative uses of SR based materials for biomedical.

  20. Issues of improving quality of training personnel for nuclear power facilities

    International Nuclear Information System (INIS)

    Jacko, J.

    1987-01-01

    The basic stages are characterized of the development of a standard system of personnel training for the start-up, operation and maintenance of nuclear power facilities. The experience is analyzed gained by the Branch Training Centre of the Nuclear Power Plant Research Institute. Suggestions are submitted for improving the quality of personnel training based on Czechoslovak and foreign experiences. (author). 3 refs

  1. IRSN's viewpoint on the safety and radiation protection of French nuclear power plants in 2007

    International Nuclear Information System (INIS)

    2009-01-01

    This report presents the viewpoint of the IRSN on the safety and radiation protection of EDF's nuclear power plants (NPPs) in operation during 2007. It does not aim to be exhaustive but rather to highlight the points the IRSN considers important for safety. Contributing to maintaining a high level of safety and radiation protection in nuclear facilities in service is one of the seven challenges of the objectives contract signed between the French Government and the IRSN. Safety demands constant vigilance on the part of all the players involved. It is never definitively acquired and must remain a priority and continuously progress, with the plant operator remaining the first entity responsible for the safety of its facility. For the IRSN, part of this mission firstly involves carefully examining and taking into consideration national and international experience feedback, and new scientific knowledge resulting from research. The implementation of improvements, whether technical or organizational or relating to human skills, then comes secondly. This report comprises four sections. In the first section, the IRSN presents the main trends that emerged from its overall review of the safety of the in-service nuclear power plants. The second section addresses the events that have marked the year due to their impact on safety. It also presents a synthesis of the radiation protection events. The third section is devoted to anomalies displaying a generic nature for several power plants. The last section covers the significant changes implemented or scheduled. These are generally modifications or plans of action intended to improve safety performance in the operation or design of the facilities. In spite of sometimes significant disparities in the results between power plants, the IRSN draws the following conclusions from its global review of the year 2007. First of all, no event had serious consequences in the fields of either safety or radioprotection. This good result must

  2. Visit to China's ARJ21 Aircraft Manufacturing Facility

    National Research Council Canada - National Science Library

    Balut, Stephen J; McNicol, David L; Nelson, J. R; Harmon, Bruce R; Holder, Stephen G

    2008-01-01

    During a December 2007 visit to China to share information about civilian aircraft costs, a delegation from IDA visited the Shanghai Aircraft Manufacturing Facility where the commercial chinese ARJ21...

  3. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FACILITIES Pt. 50, App.N Appendix N to Part 50—Standardization of Nuclear Power Plant Designs: Permits To...

  4. 77 FR 71031 - Office of Hazardous Materials Safety; Actions on Special Permit Applications

    Science.gov (United States)

    2012-11-28

    ...-Mart Stores, Inc. 49 CFR part 172, part To authorize the one-time, Bentonville, AR. 173 and part 177...- impaired retail stores impacted by Hurricane Sandy to a temporary warehousing facility for approximately 10... Request by EQ Industrial Services, Inc. Ypsilanti, MI October 4, 2012. To modify the special permit to...

  5. Web-enabled work permit system for fast breeder test reactor

    International Nuclear Information System (INIS)

    Madurai Meenachi, N.; Vinolia, K.; Ramanathan, V.

    2003-01-01

    The objective of this project is to computerize and web-enable the Work Permit System for the Fast Breeder Test Reactor (FBTR) at IGCAR, Kalpakkam. The existing Work Permit System at FBTR was studied in detail. Since all the formalities were paper-based, the risk of human error in scrutinizing all permits before reactor start-up was high. Compilation of reports (daily, monthly, yearly etc.) was tedious. The work permit system was therefore automated in order to enable the operation group manage the maintenance work carried out in the plant systematically with entries. The entire project was classified into five permit modules -maintenance, transfer, return, cancellation and reissue. Each module takes care of the entry and maintenance of data in their respective fields in their respective tables. The user is also provided with an option to take a hard copy of the report of his/her choice. A client/server based system was designed to web-enable the entire project. The server program was designed using VB 6.0 as the front-end and MS Access database as the back end to store the data. The client software was developed using Active Server Pages and published using personal web server in the Intranet. A number of administrative tools have been incorporated in the software to ensure access security and integrity of the database. An online help feature with search facilities was added to the software. The work permit system software is now already being used at FBTR and has been deemed to be an invaluable aid in empowering the availability of the reactor and determining the performance history of the equipment. (author)

  6. Decree no 2007-1557 from November 2, 2007, relative to basic nuclear facilities and to the nuclear safety control of nuclear materials transport

    International Nuclear Information System (INIS)

    2007-11-01

    This decree concerns the enforcement of articles 5, 17 and 36 of the law 2006-686 from June 13, 2006, relative to the transparency and safety in the nuclear domain. A consultative commission of basic nuclear facilities is established. The decree presents the general dispositions relative to basic nuclear facilities, the dispositions relative to their creation and operation, to their shutdown and dismantling. It precises the dispositions in the domain of public utility services, administrative procedures and sanctions. It stipulates also the particular dispositions relative to other facilities located in the vicinity of nuclear facilities, relative to the use of pressure systems, and relative to the transport of radioactive materials. (J.S.)

  7. Process of licensing nuclear facilities (resume from the Spanish National Report for the Joint Convention, 2005)

    International Nuclear Information System (INIS)

    Prieto, N.

    2007-01-01

    The process of licensing both nuclear and radioactive facilities is governed by the Regulation on Nuclear and Radioactive Facilities (Span. Reglamento de Instalaciones Nucleares y Radiactivas, RINR), approved by Royal Decree 1836/1999, of 3 December. According to the RINR, these authorizations are granted by the Ministry of Industry, Tourism and Trade (Span. Ministerio de Industria, Turismo y Comercio, MITYC), to which the corresponding requests should be addressed, along with the documentation required in each case, The MITYC sends a copy of each request and accompanying documentation to the Nuclear Safety Council (Span. Consejo de Seguridad Nuclear, CSN) for its mandatory report.) The CSN reports are mandatory and binding, both were negative or withholding in nature with respect to the request and, when positive, as regards the conditions established. On receiving the report from the CSN, and following whatever decisions or further reports might be required in each case, the MITYC will adopt the appropriate resolution. System for the licensing of nuclear facilities. According to the definitions included in the RINR, the following are nuclear facilities: - Nuclear power plants. - Nuclear reactors. - Manufacturing facilities using nuclear fuels to produce nuclear substances and those at which nuclear substances are treated. - Facilities for the permanent storage of nuclear substances. In compliance with the RINR, the nuclear facilities require different permits or administrative authorizations for their operation, these being the preliminary or site authorization, the construction permit, the operating permit, the authorization for modification and the dismantling permit. The procedure for the awarding of each of these authorizations is regulated by the Regulation itself and is briefly described below. (author)

  8. F/H effluent treatment facility. Technical data summary

    International Nuclear Information System (INIS)

    Ryan, J.P.; Stimson, R.E.

    1984-12-01

    This document provides the technical basis for the design of the facility. Some of the sections are described with options to permit simplification of the process, depending on the effluent quality criteria that the facility will have to meet. Each part of the F/HETF process is reviewed with respect to decontamination and concentration efficiency, operability, additional waste generation, energy efficiency, and compatability with the rest of the process

  9. In Memoriam Pierre-Lucien Lamant (1926-2007 In Memoriam Pierre-Lucien Lamant (1926-2007

    Directory of Open Access Journals (Sweden)

    Jean-François Klein

    2009-10-01

    Full Text Available Pierre-Lucien Lamant, Professeur émérite de l’Institut National des Langues et Civilisations Orientales (INALCO a quitté ce monde le 22 novembre 2007. Prononcer les éloges funèbres d’un ami n’est pas chose facile. Il s’agit de rendre hommage à un homme qui sut transmettre avec l’élégance et la discrétion qui le caractérisait la passion dévorante qu’il avait pour ces régions de moussons.Amoureux de la vie et de ses beautés, épicurien raffiné, esthète et savant, Pierre-Lucien Lamant vient d’un...

  10. The Journalists Initiatives on Immunisation Against Polio and Improved Acceptance of the Polio Vaccine in Northern Nigeria 2007-2015.

    Science.gov (United States)

    Warigon, Charity; Mkanda, Pascal; Banda, Richard; Zakari, Furera; Damisa, Eunice; Idowu, Audu; Bawa, Samuel; Gali, Emmanuel; Tegegne, Sisay G; Hammanyero, Kulchumi; Nsubuga, Peter; Korir, Charles; Vaz, Rui G

    2016-05-01

    The polio eradication initiative had major setbacks in 2003 and 2007 due to media campaigns in which renowned scholars and Islamic clerics criticized polio vaccines. The World Health Organization (WHO) partnered with journalists in 2007 to form the Journalists Initiatives on Immunisation Against Polio (JAP), to develop communication initiatives aimed at highlighting polio eradication activities and the importance of immunization in northern Nigeria. We evaluated the impact of JAP activities in Kaduna State by determining the total number of media materials produced and the number of newspaper clips and bulletins published in support of polio eradication. We also determined the number of households in noncompliant communities that became compliant with vaccination during 2015 supplementary immunization activities (SIAs) after JAP interventions and compared caregivers' sources of information about SIAs in 2007 before and after the JAP was formed. Since creation of the JAP, >500 reports have been published and aired, with most portraying polio vaccine positively. During June 2015 SIAs in high-risk wards of Kaduna STATE, JAP interventions resulted in vaccination of 5122 of 5991 children (85.5%) from noncompliant households. During early 2007, the number of caregivers who had heard about SIA rounds from the media increased from 26% in January, before the JAP was formed, to 33% in March, after the initiation of JAP activities. The formation of the JAP resulted in measurable improvement in the acceptance of polio vaccine in northern Nigeria. © 2016 World Health Organization; licensee Oxford Journals.

  11. JAEA-Tokai tandem annual report 2007. April 1, 2007 - March 31, 2008

    International Nuclear Information System (INIS)

    Nagame, Yuichiro; Chiba, Satoshi; Ishikawa, Norito; Mitsuoka, Shinichi; Ishii, Tetsuro; Matsuda, Makoto

    2008-11-01

    The JAEA-Tokai tandem accelerator facility has been used in various research fields of heavy-ion nuclear science and material science not only by JAEA personnel but also by researchers from universities, institutes and companies. This annual report describes a summary of research activities carried out in the period between April 1, 2007 and March 31, 2008. The forty-nine summary reports from users were categorized into seven research/development fields: (1) accelerator operation and development, (2) nuclear structure, (3) nuclear reaction, (4) nuclear chemistry, (5) nuclear theory, (6) atomic physics and solid state physics, (7) radiation effects in materials. Also contained are lists of publications, meetings, technical staff, researchers in JAEA and cooperative researchers with universities. The 49 of the presented papers are indexed individually. (J.P.N.)

  12. Operation and Maintenance Manual for the Central Facilities Area Sewage Treatment Plant

    Energy Technology Data Exchange (ETDEWEB)

    Norm Stanley

    2011-02-01

    This Operation and Maintenance Manual lists operator and management responsibilities, permit standards, general operating procedures, maintenance requirements and monitoring methods for the Sewage Treatment Plant at the Central Facilities Area at the Idaho National Laboratory. The manual is required by the Municipal Wastewater Reuse Permit (LA-000141-03) the sewage treatment plant.

  13. The practical problem of improving quality in multicenter dialysis facilities.

    Science.gov (United States)

    Balter, Paul

    2003-01-01

    Multifacility dialysis groups are frequently interested in improving overall quality and find that there are major differences between individual units. Upper management must consider what strategy is needed for the whole company and what strategy must be formulated by individual facilities. To make substantive changes, management must decide to adopt a new culture of true teamwork, drive out fear, and emphasize leadership and education both at the management level and in the individual unit. Both at the corporate and unit levels, leaders must be chosen who are able to recognize people who have the ability, the educational background, the enthusiasm, and the time to direct change. Empowering the individual units and individual employees to make changes and be enthusiastic about improvement is the key to success.

  14. Environmental Assessment for Waterfront Facilities Maintenance and Improvements, Pearl Harbor Naval Complex, Oahu, Hawaii

    National Research Council Canada - National Science Library

    2005-01-01

    Commander, Navy Region Hawaii (CNRH) proposes to repair, maintain, and improve waterfront berthing and maintenance facilities for ships and submarines on an as-needed basis within the Pearl Harbor Naval Complex (PHNC...

  15. Mesothelioma in Qingdao, PRC (2000 - 2007)

    Energy Technology Data Exchange (ETDEWEB)

    Frank, Arthur L [Drexel University School of Public Health, Philadelphia, PA 19102 (United States); Pang Zengchang; Zhang Yun [Qingdao Center for Disease Control and Prevention, Qingdao (China); Zhang Huaqiang, E-mail: alf13@drexel.ed [Qingdao Institute of Women' s and Children' s Health Care, Qingdao (China)

    2009-02-01

    The city of Qingdao, PRC has been the site of two asbestos product facilities that operated for almost fifty years, as well as a shipyard. Because of a new computerized data collection system for death certificates, almost all 48,000 yearly deaths from a population base of 7.5 million are now recorded with cause of death and {sup u}sual occupation{sup .} All mesothelioma deaths from 2000 through 2007 are reviewed and the unusual finding is that of a predominance of cases in females. The issues of competing causes of death and potential underreporting are discussed.

  16. Sendai High Court rejects residents' appeal to nullify gov't permit for Fukushima II-1

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    The Sendai High Court on March 20 rejected an appeal made by 33 residents in Naraha-cho, Fukushima Prefecture, to nullify the government permit for Tokyo Electric Power Co.'s plan to establish Fukushima II Nuclear Power Plant Unit 1 (1,100 MW, BWR) near their homes, upholding the Fukushima District Court's 1984 ruling that the government's examination is adequate to ensure safety of the Unit. The plaintiffs are considering taking the case to the Supreme Court. This is the first ruling on the safety of a nuclear power plant in Japan, after the Chernobyl accident in 1986. Unit 1 is currently in operation. Presiding Judge Yoshio Ishikawa approved almost entirely the government's arguments except that on the competence of the plaintiff. The judgement said that the 33 residents living within the radius of fifty and several kilometers from the reactor facilities have plaintiff competency, because if the safety of the reactor facilities could not be assured, the facilities could possibly present a grave danger to the lives and health of the residents. The ruling said that issuing the reactor installation permit was committed to the government's special technical discretion. (N.K.)

  17. Access to major overseas research facilities

    Energy Technology Data Exchange (ETDEWEB)

    Bolderman, J. W. [Australian Nuclear Science and Technology Organisation, Lucas Heights, NSW (Australia)

    1997-12-31

    This paper will describe four schemes which have been established to permit Australian researchers access to some of the most advanced overseas research facilities. These include, access to Major Research Facilities Program, the Australian National Beamline Facility at the Photon Factory, the Australian Synchrotron Research Program and the ISIS Agreement. The details of each of these programs is discussed and the statistics on the scientific output provided. All programs are managed on behalf of the Department of Industry, Science and Tourism by the Australian Nuclear Science and Technology Organisation. One hundred and thirteen senior scientists plus forty, one postgraduate, students were supported through these schemes during the 1996-1997 financial year. 1 fig.

  18. 77 FR 8855 - Final Reissuance of the NPDES General Permit for Facilities Related to Oil and Gas Extraction in...

    Science.gov (United States)

    2012-02-15

    ... determined that reissuance of this general permit is not likely to adversely affect Essential Fish Habitat... that issuance of the permit has no adverse effect to Essential Fish Habitat. Coastal Zone Management... initiated section 7 consultations in accordance with the Endangered Species Act with the U.S. Fish and...

  19. The best of 2007

    CERN Multimedia

    2007-01-01

    It was the year that the first "commercial" quantum computer was unveiled, and 2007 also saw a flurry of research into the supersolid state of matter. Astronomers improved our understanding of the cosmos by zeroing in on the origins of ultra-high energy cosmic rays and providing the best-ever map of dark matter in the Universe.

  20. Radiation processing in Vietnam during the period of 2005-2007

    International Nuclear Information System (INIS)

    Nguyen Quoc Hien; Tran Khac An

    2008-01-01

    Radiation technology has been increasingly applied in many countries including Vietnam. This report reviews R and D works, manpower, irradiation facilities and service irradiation in the period of 2005-2007. The orientation of the development for radiation technology in the country and co-operation programs of the Research and Development Center for Radiation Technology (VINAGAMMA) are also briefly outlined as well. (author)

  1. Southeastern Power Administration 2007 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    None

    2007-12-28

    Dear Secretary Chu: I am proud to submit Southeastern Power Administration’s (Southeastern’s) fiscal year (FY) 2007 Annual Report for your review. The information included in this report reflects Southeastern’s programs, accomplishments, and financial activities for the 12-month period beginning October 1, 2006 and ending September 30, 2007. Southeastern marketed more than 5 billion kilowatt-hours of energy to 492 wholesale Federal power customers in an 11-state marketing area in FY 2007. Revenues from the sale of this power totaled approximately $219 million. Drought conditions continued to plague the southeast region of the United States during 2007 placing strains on our natural and financial resources. Southeastern purchased more than $40 million in replacement power to meet customer contract requirements to ensure the continued reliability of our nation’s power grid. With the financial assistance and support of our Federal power customers, continued funding for capitalized equipment replacements at various Corps of Engineers’ (Corps) hydroelectric projects provided much needed repairs and maintenance for aging facilities. Southeastern’s cyber and physical security program continued to be reviewed and updated to meet Department of Energy (DOE), Homeland Security, and North American Electric Reliability Corporation standards and requirements. Plans for the upcoming year include communication and cooperation with DOE, Federal power customers, and the Corps to maximize the benefits of our nation’s water resources. Competition for the use of water and the prolonged drought conditions will present another challenging year for our agency. The employees at Southeastern will be proactive in meeting these challenges and providing reliable hydroelectric power to the people in the southeast. Sincerely, Kenneth E. Legg Administrator

  2. Operation of the UKK-2 facility for tube complex testing and way of its further improvement

    International Nuclear Information System (INIS)

    Ogarkov, N.V.; Senyutkin, P.A.; Silaev, A.N.; Topychkanov, V.V.

    1987-01-01

    The UKK-2 ultrasonic 8-channel facility for complex control is designed for control of continuity, wall thickness of 0.3-1.0 mm, inner diameter of tubes and external diameter of 7-15 mm. Utilization of UKK-2 increased reliability of control, stabilized tube quality at a higher level, increased control efficiency 2-3 times. The most noticeable shortcomings of the UKK-2 are as follows: impossibility of differential separation of tubes rejected by sizes, by rectifiable and nonrectifiable rejects as well as absence of devices for mechanized loading, unloading and grading the tubes. The flowsheet, design and technological shortcomings of the facility are discovered during its operation. Ways of further improvement of the facility are as follows: development of the system for control result analysis on the basis of a microcomputer, equipment with devices for loading, unloading and grading the tubes; development of more reliable electron devices and units, means of automated diagnostics and automated tuning, increase of the level of metrological provision, improvement of hardware and software of the facility

  3. Permitting plan for project W-320 tank 241-C-106 waste retrieval sluicing system (WRSS)

    International Nuclear Information System (INIS)

    Symons, G.A.

    1997-01-01

    This document describes the permitting plan for Project W-320, Tank 241-C-106 Waste Retrieval Sluicing System (WRSS). A comprehensive review of environmental regulations have indicated that several environmental reviews [e.g. National Environmental Policy Act (NEPA), State Environmental Policy Act (SEPA)], permits, and approvals are required prior to construction or operation of the facility. The environmental reviews, permits and approvals, as well the regulatory authority, potentially applicable to the Tank 241-C-106 WRSS include the following: for NEPA - U.S. Department of Energy-Headquarters: Action Description Memorandum, Environmental Assessment, Categorical Exclusion, and Environmental Impact Statement; and for SEPA - State of Washington Department of Ecology (Ecology) Determination of Nonsignificance, Mitigated Determination of Nonsignificance, Determination of Significance, and SEPA Environmental Checklist

  4. State waste discharge permit application, 200-E chemical drain field

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect ground would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE 91NM-177 requires a series of permitting activities for liquid effluent discharges. This document presents the State Waste Discharge Permit (SWDP) application for the 200-E Chemical Drain Field. Waste water from the 272-E Building enters the process sewer line directly through a floor drain, while waste water from the 2703-E Building is collected in two floor drains, (north and south) that act as sumps and are discharged periodically. The 272-E and 2703-E Buildings constitute the only discharges to the process sewer line and the 200-E Chemical Drain Field.

  5. State waste discharge permit application, 200-E chemical drain field

    International Nuclear Information System (INIS)

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect ground would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE 91NM-177 requires a series of permitting activities for liquid effluent discharges. This document presents the State Waste Discharge Permit (SWDP) application for the 200-E Chemical Drain Field. Waste water from the 272-E Building enters the process sewer line directly through a floor drain, while waste water from the 2703-E Building is collected in two floor drains, (north and south) that act as sumps and are discharged periodically. The 272-E and 2703-E Buildings constitute the only discharges to the process sewer line and the 200-E Chemical Drain Field

  6. Force Measurement Improvements to the National Transonic Facility Sidewall Model Support System

    Science.gov (United States)

    Goodliff, Scott L.; Balakrishna, Sundareswara; Butler, David; Cagle, C. Mark; Chan, David; Jones, Gregory S.; Milholen, William E., II

    2016-01-01

    The National Transonic Facility is a transonic pressurized cryogenic facility. The development of the high Reynolds number semi-span capability has advanced over the years to include transonic active flow control and powered testing using the sidewall model support system. While this system can be used in total temperatures down to -250Â F for conventional unpowered configurations, it is limited to temperatures above -60Â F when used with powered models that require the use of the high-pressure air delivery system. Thermal instabilities and non-repeatable mechanical arrangements revealed several data quality shortfalls by the force and moment measurement system. Recent modifications to the balance cavity recirculation system have improved the temperature stability of the balance and metric model-to-balance hardware. Changes to the mechanical assembly of the high-pressure air delivery system, particularly hardware that interfaces directly with the model and balance, have improved the repeatability of the force and moment measurement system. Drag comparisons with the high-pressure air system removed will also be presented in this paper.

  7. Managing Human Performance to Improve Nuclear Facility Operation

    International Nuclear Information System (INIS)

    2013-01-01

    . It describes how human performance can be managed within an overall performance improvement model. The need for IAEA involvement in this area and to address key issues highlighted in IAEA Nuclear Energy Series No. NG-G-2.1 were reinforced during the meetings of the Technical Working Group on Managing Human Resources in the Field of Nuclear Energy (TWG-MHR) in 2008 and 2010. The importance of human performance in the safe operation of any nuclear facility is no longer in doubt. The contribution of human performance to the occurrence of significant events and, consequently, to overall performance in the nuclear field has been well documented. Monitoring and continually improving human performance has now become one of the key challenges in the management of human resources for nuclear facilities. To facilitate meeting the challenge of improving human performance, a model of performance improvement is presented that provides a framework which can be used to improve individual, process and organizational performance. It is generally postulated that without human performance improvement, a safe working environment is impossible to maintain. While there are many different perspectives from which safety issues might be addressed, there are several factors significant for human performance improvement that are consistent, useful and necessary to understand. This publication is not intended as an all encompassing guide to managing human performance, but, rather, provides a summary of concepts and good practices for organizations to consider in their design of various programmes and in the performance of activities. In addition, tools that are helpful for managing human performance are discussed, and references for more detailed information on these concepts and tools are provided

  8. Improving the Quality of Services in Residential Treatment Facilities: A Strength-Based Consultative Review Process

    Science.gov (United States)

    Pavkov, Thomas W.; Lourie, Ira S.; Hug, Richard W.; Negash, Sesen

    2010-01-01

    This descriptive case study reports on the positive impact of a consultative review methodology used to conduct quality assurance reviews as part of the Residential Treatment Center Evaluation Project. The study details improvement in the quality of services provided to youth in unmonitored residential treatment facilities. Improvements were…

  9. Fuel cycle and waste newsletter, Vol. 3, No. 3, December 2007

    International Nuclear Information System (INIS)

    2007-12-01

    This issue of the Fuel Cycle and Waste Newsletter reports on the IAEA's International Conference on Research Reactors which focused on sharing the latest scientific, technical and safety information related to research reactors including projects on design, construction and commissioning of new research facilities. This issue further covers reports of some of the activities performed by the Division of Nuclear Fuel Cycle and Waste Technology including information on upgrading radioactive waste management facilities, aqueous homogeneous reactors for isotope production, activities of the contact experts group in 2007, current activities related to HEU minimization, repatriation of radioactive sources in Nigeria, the 2007 TWGNFCO (Nuclear Fuel Cycle Options and Spent Fuel Management) meeting, the stakeholder involvement in decommissioning (draft technical report in preparation), initial activities of the International Decommissioning Network (IDN), spent fuel publications, the thorium fuel cycle, the Nuclear Fuel Cycle Simulation System (NFCSS). Finally, it presents a bibliography of recent publications of IAEA's Division of Nuclear Fuel Cycle and Waste Technology as well as a list of Meetings in 2008

  10. Local seismic network at the Olkiluoto site. Annual Report for 2007

    International Nuclear Information System (INIS)

    Saari, J.; Lakio, A.

    2008-05-01

    In February 2002, Posiva Oy established a local seismic network of six stations on the island of Olkiluoto. Later, in June 2004, the seismic network was expanded with two new seismic stations. At that time started the excavation of the underground characterisation facility (the ONKALO) and the basic operation procedure was changed more suitable for the demands of the new situation. In the beginning of 2006, the target area of the seismic monitoring expanded to semiregional scale. Four new seismic stations started in the beginning of February 2006 and the focus of interpretation was expanded to an area, called the seismic semi-regional area. At the end of 2006, two new borehole geophones were installed in order to improve the sensitivity and the depth resolution of the measurements inside the ONKALO block. The purpose of the microearthquake measurements at Olkiluoto is to improve understanding of the structure, behaviour and long term stability of the bedrock. The studies include both tectonic and excavation-induced microearthquakes. An additional task of monitoring is related to safeguarding of the ONKALO. This report gives the results of microseismic monitoring during the year 2007. Also the changes in the structure and the operation procedure of the network are described. The true orientation of the borehole sensor OL-OS13 was calculated. The correct orientation of triaxial seismometer is essential when the fault plane solution of an earthquake is calculated. The other borehole sensor OL-OS14 was permanently disconnected in October 2007. The network has operated continuously in 2007. Altogether 2207 events have been located in the Olkiluoto area, in reported time period. Altogether 2207 events have been located in 2007. Most of them (1912) are explosions occurred inside the seismic semiregional area and especially inside the ONKALO block (1891 events). The magnitudes of the observed events inside the semi-regional area range from ML = -2.1 to ML = 1.5 (ML

  11. Annual report of JMTR, FY2006. April 1, 2006 - March 31, 2007

    International Nuclear Information System (INIS)

    2008-03-01

    During the FY2006 (April 2006 to March 2007), the Japan Materials Testing Reactor (JMTR) was operated for three operation cycles from 162nd cycle to 165th cycle. Various irradiation tests and post-irradiation examinations (PIEs) were performed for studies on Irradiation Assisted Stress Corrosion Cracking (IASCC) of light-water-reactor internals, development of the fusion blanket, basic materials researches, radioisotope production, and so on. The operation was stopped by 165th cycle according to schedule. And maintenance work and preservation work of the facilities has been started for the refurbishment of the JMTR. Renewal of equipments and aging management of equipments and reactor facilities were carried out according to long-term maintenance plan which was based on periodical evaluation related to maintenance and safety management of reactor facilities. Regarding development on irradiation techniques, the in-situ irradiation tests using load control unit which was developed for in-pile SCC tests of IASCC studies were finished. At the hot laboratory, PIEs for the Radiation Induced Surface Activation (RISA) capsule were performed with the X-ray diffract meter which was moved from the Nuclear Science Research Institute. Under the Arrangement for the Implementation of Cooperative Research Program between the JAEA and the Korea Atomic Energy Research Institute (KAERI), mutual exchange was conducted for information exchange of irradiation and PIE techniques. As for the refurbishment and restart of JMTR, contents of the midterm targets were changed according to unofficial notification of budget in FY2007 by the Ministry of Finance. And it was officially decided to start refurbishment work at FY2007 for restart of the JMTR in FY2011. (author)

  12. ENVIRONMENTALLY SOUND DISPOSAL OF RADIOACTIVE MATERIALS AT A RCRA HAZARDOUS WASTE DISPOSAL FACILITY

    International Nuclear Information System (INIS)

    Romano, Stephen; Welling, Steven; Bell, Simon

    2003-01-01

    The use of hazardous waste disposal facilities permitted under the Resource Conservation and Recovery Act (''RCRA'') to dispose of low concentration and exempt radioactive materials is a cost-effective option for government and industry waste generators. The hazardous and PCB waste disposal facility operated by US Ecology Idaho, Inc. near Grand View, Idaho provides environmentally sound disposal services to both government and private industry waste generators. The Idaho facility is a major recipient of U.S. Army Corps of Engineers FUSRAP program waste and received permit approval to receive an expanded range of radioactive materials in 2001. The site has disposed of more than 300,000 tons of radioactive materials from the federal government during the past five years. This paper presents the capabilities of the Grand View, Idaho hazardous waste facility to accept radioactive materials, site-specific acceptance criteria and performance assessment, radiological safety and environmental monitoring program information

  13. 2013 Annual Wastewater Reuse Report for the Idaho National Laboratory Site’s Central Facilities Area Sewage Treatment Plant

    Energy Technology Data Exchange (ETDEWEB)

    Mike Lewis

    2014-02-01

    This report describes conditions, as required by the state of Idaho Wastewater Reuse Permit (#LA-000141-03), for the wastewater land application site at the Idaho National Laboratory Site’s Central Facilities Area Sewage Treatment Plant from November 1, 2012, through October 31, 2013. The report contains, as applicable, the following information: • Site description • Facility and system description • Permit required monitoring data and loading rates • Status of compliance conditions and activities • Discussion of the facility’s environmental impacts. During the 2013 permit year, no wastewater was land-applied to the irrigation area of the Central Facilities Area Sewage Treatment Plant and therefore, no effluent flow volumes or samples were collected from wastewater sampling point WW-014102. However, soil samples were collected in October from soil monitoring unit SU-014101.

  14. Run permit software for the proton storage ring

    International Nuclear Information System (INIS)

    Bair, S.S.

    1985-01-01

    The Run Permit system is intended to protect equipment from radiation effects caused by having beam enabled when required equipment is not operational. This system will not allow beam unless certain devices are ready and will drop beam if any of these devices become inoperative. A system to provide such protection might be implemented in hardware. However, because the several operating modes of the Proton Storage Ring/Weapons Neutron Research facility require certain devices to be in different states (depending on mode), a dynamic configuration capability is needed, that is, a software solution is more feasible

  15. Sepsis in general surgery: the 2005-2007 national surgical quality improvement program perspective.

    Science.gov (United States)

    Moore, Laura J; Moore, Frederick A; Todd, S Rob; Jones, Stephen L; Turner, Krista L; Bass, Barbara L

    2010-07-01

    To document the incidence, mortality rate, and risk factors for sepsis and septic shock compared with pulmonary embolism and myocardial infarction in the general-surgery population. Retrospective review. American College of Surgeons National Surgical Quality Improvement Program institutions. General-surgery patients in the 2005-2007 National Surgical Quality Improvement Program data set. Incidence, mortality rate, and risk factors for sepsis and septic shock. Of 363 897 general-surgery patients, sepsis occurred in 8350 (2.3%), septic shock in 5977 (1.6%), pulmonary embolism in 1078 (0.3%), and myocardial infarction in 615 (0.2%). Thirty-day mortality rates for each of the groups were as follows: 5.4% for sepsis, 33.7% for septic shock, 9.1% for pulmonary embolism, and 32.0% for myocardial infarction. The septic-shock group had a greater percentage of patients older than 60 years (no sepsis, 40.2%; sepsis, 51.7%; and septic shock, 70.3%; P surgery resulted in more cases of sepsis (4.5%) and septic shock (4.9%) than did elective surgery (sepsis, 2.0%; septic shock, 1.2%) (P surgery, and the presence of any comorbidity. This study emphasizes the need for early recognition of patients at risk via aggressive screening and the rapid implementation of evidence-based guidelines.

  16. Cogeneration : A Regulatory Guide to Leasing, Permitting, and Licensing in Idaho, Montana, Oregon, and Washington.

    Energy Technology Data Exchange (ETDEWEB)

    Deshaye, Joyce; Bloomquist, R. Gordon

    1992-12-01

    This guidebook focuses on cogeneration development. It is one of a series of four guidebooks recently prepared to introduce the energy developer to the federal, state and local agencies that regulate energy facilities in Idaho, Montana, Oregon, and Washington (the Bonneville Power Administration Service Territory). It was prepared specifically to help cogeneration developers obtain the permits, licenses and approvals necessary to construct and operate a cogeneration facility. The regulations, agencies and policies described herein are subject to change. Changes are likely to occur whenever energy or a project becomes a political issue, a state legislature meets, a preexisting popular or valuable land use is thought threatened, elected and appointed officials change, and new directions are imposed on states and local governments by the federal government. Accordingly, cogeneration developers should verify and continuously monitor the status of laws and rules that might affect their plans. Developers are cautioned that the regulations described herein may only be a starting point on the road to obtaining all the necessary permits.

  17. Safety study of fire protection for nuclear fuel cycle facility

    International Nuclear Information System (INIS)

    2013-01-01

    Insufficiencies in the fire protection system of the nuclear reactor facilities were pointed out when the fire occurred due to the Niigata prefecture-Chuetsu-oki Earthquake in July, 2007. This prompted the revision of the fire protection safety examination guideline for nuclear reactors as well as commercial guidelines. The commercial guidelines have been endorsed by the regulatory body. Now commercial fire protection standards for nuclear facilities such as the design guideline and the management guideline for protecting fire in the Light Water Reactors (LWRs) are available, however, those to apply to the nuclear fuel cycle facilities such as mixed oxide fuel fabrication facility (MFFF) have not been established. For the improvement of fire protection system of the nuclear fuel cycle facilities, the development of a standard for the fire protection, corresponding to the commercial standard for LWRs were required. Thus, Japan Nuclear Energy Safety Organization (JNES) formulated a fire protection guidelines for nuclear fuel cycle facilities as a standard relevant to the fire protection of the nuclear fuel cycle facilities considering functions specific to the nuclear fuel cycle facilities. In formulating the guidelines, investigation has been conduced on the commercial guidelines for nuclear reactors in Japan and the standards relevant to the fire protection of nuclear facilities in USA and other countries as well as non-nuclear industrial fire protection standards. The guideline consists of two parts; Equipments and Management, as the commercial guidances of the nuclear reactor. In addition, the acquisition of fire evaluation data for a components (an electric cabinet, cable, oil etc.) targeted for spread of fire and the evaluation model of fire source were continued for the fire hazard analysis (FHA). (author)

  18. The importance of public sector health facility-level data for monitoring changes in maternal mortality risks among communities: the case of pakistan.

    Science.gov (United States)

    Jain, Anrudh K; Sathar, Zeba; Salim, Momina; Shah, Zakir Hussain

    2013-09-01

    This paper illustrates the importance of monitoring health facility-level information to monitor changes in maternal mortality risks. The annual facility-level maternal mortality ratios (MMRs), complications to live births ratios and case fatality ratios (CFRs) were computed from data recorded during 2007 and 2009 in 31 upgraded public sector health facilities across Pakistan. The facility-level MMR declined by about 18%; both the number of Caesarean sections and the episodes of complications as a percentage of live births increased; and CFR based on Caesarean sections and episodes of complications declined by 29% and 37%, respectively. The observed increases in the proportion of women with complications among those who come to these facilities point to a reduction in the delay in reaching facilities (first and second delays; Thaddeus & Maine, 1994); the decrease in CFRs points to improvements in treating obstetric complications and a reduction in the delay in receiving treatment once at facilities (the third delay). These findings point to a decline in maternal mortality risks among communities served by these facilities. A system of woman-level data collection instituted at health facilities with comprehensive emergency obstetric care is essential to monitor changes in the effects of any reduction in the three delays and any improvement in quality of care or the effectiveness of treating pregnancy-related complications among women reaching these facilities. Such a system of information gathering at these health facilities would also help policymakers and programme mangers to measure and improve the effectiveness of safe-motherhood initiatives and to monitor progress being made toward achieving the fifth Millennium Development Goal.

  19. NASA Glenn's Single-Stage Axial Compressor Facility Upgraded

    Science.gov (United States)

    Brokopp, Richard A.

    2004-01-01

    NASA Glenn Research Center's Single-Stage Axial Compressor Facility was upgraded in fiscal year 2003 to expand and improve its research capabilities for testing high-speed fans and compressors. The old 3000-hp drive motor and gearbox were removed and replaced with a refurbished 7000-hp drive motor and gearbox, with a maximum output speed of 21,240 rpm. The higher horsepower rating permits testing of fans and compressors with higher pressure ratio or higher flow. A new inline torquemeter was installed to provide an alternate measurement of fan and compressor efficiency, along with the standard pressure and temperature measurements. A refurbished compressor bearing housing was also installed with bidirectional rotation capability, so that a variety of existing hardware could be tested. Four new lubrication modules with backup capability were installed for the motor, gearbox, torquemeter, and compressor bearing housing, so that in case the primary pump fails, the backup will prevent damage to the rotating hardware. The combustion air supply line for the facility inlet air system was activated to provide dry air for repeatable inlet conditions. New flow conditioning hardware was installed in the facility inlet plenum tank, which greatly reduced the inlet turbulence. The new inlet can also be easily modified to accommodate 20- or 22-in.-diameter fans and compressors, so a variety of existing hardware from other facilities (such as Glenn's 9- by 15-Foot Low-Speed Wind Tunnel) can be tested in the Single-Stage Axial Compressor Facility. An exhaust line was also installed to provide bleed capability to remove the inlet boundary layer. To improve the operation and control of the facility, a new programmable logic controller (PLC) was installed to upgrade from hardwired relay logic to software logic. The PLC also enabled the usage of human-machine interface software to allow for easier operation of the facility and easier reconfiguration of the facility controls when

  20. Areva reference document 2007; Areva document de reference 2007

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-07-01

    This reference document contains information on the AREVA group's objectives, prospects and development strategies, particularly in Chapters 4 and 7. It contains also information on the markets, market shares and competitive position of the AREVA group. Content: 1 - Person responsible for the reference document and persons responsible for auditing the financial statements; 2 - Information pertaining to the transaction (not applicable); 3 - General information on the company and its share capital: Information on Areva, Information on share capital and voting rights, Investment certificate trading, Dividends, Organization chart of AREVA group companies, Equity interests, Shareholders' agreements; 4 - Information on company operations, new developments and future prospects: Overview and strategy of the AREVA group, The Nuclear Power and Transmission and Distribution markets, The energy businesses of the AREVA group, Front End division, Reactors and Services division, Back End division, Transmission and Distribution division, Major contracts 140 Principal sites of the AREVA group, AREVA's customers and suppliers, Sustainable Development and Continuous Improvement, Capital spending programs, Research and Development programs, Intellectual Property and Trademarks, Risk and insurance; 5 - Assets financial position financial performance: Analysis of and comments on the group's financial position and performance, Human Resources report, Environmental report, Consolidated financial statements 2007, Notes to the consolidated financial statements, Annual financial statements 2007, Notes to the corporate financial statements; 6 - Corporate governance: Composition and functioning of corporate bodies, Executive compensation, Profit-sharing plans, AREVA Values Charter, Annual Ordinary General Meeting of Shareholders of April 17, 2008; 7 - Recent developments and future prospects: Events subsequent to year-end closing for 2007, Outlook; Glossary; table of concordance.

  1. The impact of reducing financial barriers on utilisation of a primary health care facility in Rwanda

    Science.gov (United States)

    Dhillon, Ranu S.; Bonds, Matthew H.; Fraden, Max; Ndahiro, Donald; Ruxin, Josh

    2011-01-01

    This study investigates the impact of subsidising community-based health insurance (mutuelle) enrolment, removing point-of-service co-payments, and improving service delivery on health facility utilisation rates in Mayange, a sector of rural Rwanda of approximately 25,000 people divided among five ‘imidugudu’ or small villages. While comprehensive service upgrades were introduced in the Mayange Health Centre between April 2006 and February 2007, utilisation rates remained similar to comparison sites. Between February 2007 and April 2007, subsidies for mutuelle enrolment established virtually 100% coverage. Immediately after co-payments were eliminated in February 2007, patient visits levelled at a rate triple the previous value. Regression analyses using data from Mayange and two comparison sites indicate that removing financial barriers resulted in about 0.6 additional annual visits for curative care per capita. Although based on a single local pilot, these findings suggest that in order to achieve improved health outcomes, key short-term objectives include improved service delivery and reduced financial barriers. Based on this pilot, higher utilisation rates may be affected if broader swaths of the population are enrolled in mutuelle and co-payments are eliminated. Health leaders in Rwanda should consider further studies to determine if the impact of eliminating co-payments and increasing subsidies for mutuelle enrolment as seen in Mayange holds at greater levels of scale. Broader studies to better elucidate the impact of enrolment subsidies and co-payment subsidies on utilisation, health outcomes, and costs would also provide policy insights. PMID:21732708

  2. 20 CFR 670.210 - How are center facility improvements and new construction handled?

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false How are center facility improvements and new construction handled? 670.210 Section 670.210 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR THE JOB CORPS UNDER TITLE I OF THE WORKFORCE INVESTMENT ACT Site Selection and Protection...

  3. City of Richland 300 Area industrial wastewater permit application

    International Nuclear Information System (INIS)

    1995-05-01

    Battelle-Pacific Northwest Labs and Westinghouse Hanford Co. are responsible for operating most of the facilities within the 300 Area; other contractors are also involved. The document gives briefly water/wastewater data: water sources, water usage, water discharge/loss, NPDES permit status, plant sewer outlets size and flow, etc. The document also includes the following attachments: 300 Area building list, Oct. 1993-Oct. 1994 300 Area water balance, waste shipments for CY 1994, complete chemical listing, sanitary sewer sampling results (12/19/94, 1/18/95, 1/15/95), and priority pollutant listings

  4. IRSN's viewpoint on the safety and radiation protection of French nuclear power plants in 2007

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-07-01

    This report presents the viewpoint of the IRSN on the safety and radiation protection of EDF's nuclear power plants (NPPs) in operation during 2007. It does not aim to be exhaustive but rather to highlight the points the IRSN considers important for safety. Contributing to maintaining a high level of safety and radiation protection in nuclear facilities in service is one of the seven challenges of the objectives contract signed between the French Government and the IRSN. Safety demands constant vigilance on the part of all the players involved. It is never definitively acquired and must remain a priority and continuously progress, with the plant operator remaining the first entity responsible for the safety of its facility. For the IRSN, part of this mission firstly involves carefully examining and taking into consideration national and international experience feedback, and new scientific knowledge resulting from research. The implementation of improvements, whether technical or organizational or relating to human skills, then comes secondly. This report comprises four sections. In the first section, the IRSN presents the main trends that emerged from its overall review of the safety of the in-service nuclear power plants. The second section addresses the events that have marked the year due to their impact on safety. It also presents a synthesis of the radiation protection events. The third section is devoted to anomalies displaying a generic nature for several power plants. The last section covers the significant changes implemented or scheduled. These are generally modifications or plans of action intended to improve safety performance in the operation or design of the facilities. In spite of sometimes significant disparities in the results between power plants, the IRSN draws the following conclusions from its global review of the year 2007. First of all, no event had serious consequences in the fields of either safety or radioprotection. This good result

  5. Statistical evaluation of effluent monitoring data for the 200 Area Treated Effluent Disposal Facility

    International Nuclear Information System (INIS)

    Chou, C.J.; Johnson, V.G.

    2000-01-01

    The 200 Area Treated Effluent Disposal Facility (TEDF) consists of a pair of infiltration basins that receive wastewater originating from the 200 West and 200 East Areas of the Hanford Site. TEDF has been in operation since 1995 and is regulated by State Waste Discharge Permit ST 4502 (Ecology 1995) under the authority of Chapter 90.48 Revised Code of Washington (RCW) and Washington Administrative Code (WAC) Chapter 173-216. The permit stipulates monitoring requirements for effluent (or end-of-pipe) discharges and groundwater monitoring for TEDF. Groundwater monitoring began in 1992 prior to TEDF construction. Routine effluent monitoring in accordance with the permit requirements began in late April 1995 when the facility began operations. The State Waste Discharge Permit ST 4502 included a special permit condition (S.6). This condition specified a statistical study of the variability of permitted constituents in the effluent from TEDF during its first year of operation. The study was designed to (1) demonstrate compliance with the waste discharge permit; (2) determine the variability of all constituents in the effluent that have enforcement limits, early warning values, and monitoring requirements (WHC 1995); and (3) determine if concentrations of permitted constituents vary with season. Additional and more frequent sampling was conducted for the effluent variability study. Statistical evaluation results were provided in Chou and Johnson (1996). Parts of the original first year sampling and analysis plan (WHC 1995) were continued with routine monitoring required up to the present time

  6. Does a voucher program improve reproductive health service delivery and access in Kenya?

    Science.gov (United States)

    Njuki, Rebecca; Abuya, Timothy; Kimani, James; Kanya, Lucy; Korongo, Allan; Mukanya, Collins; Bracke, Piet; Bellows, Ben; Warren, Charlotte E

    2015-05-23

    Current assessments on Output-Based Aid (OBA) programs have paid limited attention to the experiences and perceptions of the healthcare providers and facility managers. This study examines the knowledge, attitudes, and experiences of healthcare providers and facility managers in the Kenya reproductive health output-based approach voucher program. A total of 69 in-depth interviews with healthcare providers and facility managers in 30 voucher accredited facilities were conducted. The study hypothesized that a voucher program would be associated with improvements in reproductive health service provision. Data were transcribed and analyzed by adopting a thematic framework analysis approach. A combination of inductive and deductive analysis was conducted based on previous research and project documents. Facility managers and providers viewed the RH-OBA program as a feasible system for increasing service utilization and improving quality of care. Perceived benefits of the program included stimulation of competition between facilities and capital investment in most facilities. Awareness of family planning (FP) and gender-based violence (GBV) recovery services voucher, however, remained lower than the maternal health voucher service. Relations between the voucher management agency and accredited facilities as well as existing health systems challenges affect program functions. Public and private sector healthcare providers and facility managers perceive value in the voucher program as a healthcare financing model. They recognize that it has the potential to significantly increase demand for reproductive health services, improve quality of care and reduce inequities in the use of reproductive health services. To improve program functioning going forward, there is need to ensure the benefit package and criteria for beneficiary identification are well understood and that the public facilities are permitted greater autonomy to utilize revenue generated from the voucher program.

  7. Factors Which Influenced the Success of the Implementation of the Regulation of the Minister of Home Affairs Number 59 of 2007 in North Sumatera Provincial Government

    Directory of Open Access Journals (Sweden)

    Amar Rinanda Lubis

    2016-06-01

    Full Text Available This study aimed to test empirically and analyze the influence of regulation, commitment, human resources and supporting devices to the successful implementation of the Regulation of the Minister of Home Affairs No.59 Year 2007. Population in this study is SKPD Officer of North Sumatra Province (108 people which was sampled for 93 people. Simultaneous F test and partial t test were used to studies effects of regulation, commitment, human resources and supporting facilities to the successful implementation of the Regulation of the Minister of Home Affairs No. 59, year 2007. These results prove that the regulation, commitment, human resources and supporting devices simultaneously influenced the successful implementation of the Regulation of the Minister of Home Affairs No. 59 Year 2007. In partial, regulation, commitment and human resources affected successful implementation of the Regulation of the Minister of Home Affairs No. 59 Year 2007, while the supporting facilities did not have an effect. These results showed that 48% variations of successful implementation of the Regulation of the Minister of Home Affairs No.59 Year 2007, depended on variable of regulation, commitment, human resources and supporting facilities and the remaining 52% depended on other uninvestigated variables.

  8. Continuous quality improvement in substance abuse treatment facilities: How much does it cost?

    Science.gov (United States)

    Hunt, Priscillia; Hunter, Sarah B; Levan, Deborah

    2017-06-01

    Continuous quality improvement (CQI) has grown in the U.S. since the 1970s, yet little is known about the costs to implement CQI in substance abuse treatment facilities. This paper is part of a larger group randomized control trial in a large urban county evaluating the impact of Plan-Study-Do-Act (PDSA)-CQI designed for community service organizations (Hunter, Ober, Paddock, Hunt, & Levan, 2014). Operated by one umbrella organization, each of the eight facilities of the study, four residential and four outpatient substance abuse treatment facilities, selected their own CQI Actions, including administrative- and clinical care-related Actions. Using an activity-based costing approach, we collected labor and supplies and equipment costs directly attributable to CQI Actions over a 12-month trial period. Our study finds implementation of CQI and meeting costs of this trial per facility were approximately $2000 to $10,500 per year ($4500 on average), or $10 to $60 per admitted client. We provide a description of the sources of variation in these costs, including differing intensity of the CQI Actions selected, which should help decision makers plan use of PDSA-CQI. Copyright © 2017. Published by Elsevier Inc.

  9. Alternative energy facility siting policies for urban coastal areas: executive summary of findings and policy recommendations

    Energy Technology Data Exchange (ETDEWEB)

    Morell, D; Singer, G

    1980-11-01

    An analysis was made of siting issues in the coastal zone, one of the nation's most critical natural resource areas and one which is often the target for energy development proposals. The analysis addressed the changing perceptions of citizens toward energy development in the coastal zone, emphasizing urban communities where access to the waterfront and revitalization of waterfront property are of interest to the citizen. The findings of this analysis are based on an examination of energy development along New Jersey's urban waterfront and along the Texas-Louisiana Gulf Coast, and on redevelopment efforts in Seattle, San Francisco, Boston, and elsewhere. The case studies demonstrate the significance of local attitudes and regional cooperation in the siting process. In highly urbanized areas, air quality has become a predominant concern among citizen groups and an influential factor in development of alternative energy facility siting strategies, such as consideration of inland siting connected by pipeline to a smaller coastal facility. The study addresses the economic impact of the permitting process on the desirability of energy facility investments, and the possible effects of the location selected for the facility on the permitting process and investment economics. The economic analysis demonstrates the importance of viewing energy facility investments in a broad perspective that includes the positive or negative impacts of various alternative siting patterns on the permitting process. Conclusions drawn from the studies regarding Federal, state, local, and corporate politics; regulatory, permitting, licensing, environmental assessment, and site selection are summarized. (MCW)

  10. Possible modernization of the U-400 cyclotron facilities to perform precise RIB experiments in the vicinity of the Coulomb barrier. (The technical proposal)

    International Nuclear Information System (INIS)

    Majdikov, V.Z.; Bashevoj, V.V.; Mel'nikov, V.N.

    1998-01-01

    An analysis of the ion-optical parameters of the existing facilities for precise nuclear reactions experiments at the U-400 cyclotron swichyard shows that some improvement can be made to perform RIB experiments at the Coulomb barrier of interactions. A change in the position of a dozen of quadrupole lenses at the cyclotron switchyard permits one to obtain parameters of magnetic spectrometers adequate for the modern experiments

  11. Improvement of safety approach for accident during operation of LILW disposal facility: Application for operational safety assessment of the near-surface LILW disposal facility in Korea

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Hyun Joo; Kim, Min Seong; Park, Jin Beak [Korea Radioactive Waste Agency, Daejeon (Korea, Republic of)

    2017-06-15

    To evaluate radiological impact from the operation of a low- and intermediate-level radioactive waste disposal facility, a logical presentation and explanation of expected accidental scenarios is essential to the stakeholders of the disposal facility. The logical assessment platform and procedure, including analysis of the safety function of disposal components, operational hazard analysis, operational risk analysis, and preparedness of remedial measures for operational safety, are improved in this study. In the operational risk analysis, both design measures and management measures are suggested to make it possible to connect among design, operation, and safety assessment within the same assessment platform. For the preparedness of logical assessment procedure, classifcation logic of an operational accident is suggested based on the probability of occurrence and consequences of assessment results. The improved assessment platform and procedure are applied to an operational accident analysis of the Korean low- and intermediate-level radioactive waste disposal facility and partly presented in this paper.

  12. Improvement of safety approach for accident during operation of LILW disposal facility: Application for operational safety assessment of the near-surface LILW disposal facility in Korea

    International Nuclear Information System (INIS)

    Kim, Hyun Joo; Kim, Min Seong; Park, Jin Beak

    2017-01-01

    To evaluate radiological impact from the operation of a low- and intermediate-level radioactive waste disposal facility, a logical presentation and explanation of expected accidental scenarios is essential to the stakeholders of the disposal facility. The logical assessment platform and procedure, including analysis of the safety function of disposal components, operational hazard analysis, operational risk analysis, and preparedness of remedial measures for operational safety, are improved in this study. In the operational risk analysis, both design measures and management measures are suggested to make it possible to connect among design, operation, and safety assessment within the same assessment platform. For the preparedness of logical assessment procedure, classifcation logic of an operational accident is suggested based on the probability of occurrence and consequences of assessment results. The improved assessment platform and procedure are applied to an operational accident analysis of the Korean low- and intermediate-level radioactive waste disposal facility and partly presented in this paper

  13. 77 FR 22267 - Eagle Permits; Changes in the Regulations Governing Eagle Permitting

    Science.gov (United States)

    2012-04-13

    ... with rotating wind turbines. Permit Duration and Transferability In February 2011, we published draft... permit applicants, because of the known risk to eagles from collisions with wind turbines and electric... change does not affect the tenure of any other migratory bird or eagle permit type. DATES: Electronic...

  14. Bloodstream infection rates in outpatient hemodialysis facilities participating in a collaborative prevention effort: a quality improvement report.

    Science.gov (United States)

    Patel, Priti R; Yi, Sarah H; Booth, Stephanie; Bren, Virginia; Downham, Gemma; Hess, Sally; Kelley, Karen; Lincoln, Mary; Morrissette, Kathy; Lindberg, Curt; Jernigan, John A; Kallen, Alexander J

    2013-08-01

    Bloodstream infections (BSIs) cause substantial morbidity in hemodialysis patients. In 2009, the US Centers for Disease Control and Prevention (CDC) sponsored a collaborative project to prevent BSIs in outpatient hemodialysis facilities. We sought to assess the impact of a set of interventions on BSI and access-related BSI rates in participating facilities using data reported to the CDC's National Healthcare Safety Network (NHSN). Quality improvement project. Patients in 17 outpatient hemodialysis facilities that volunteered to participate. Facilities reported monthly event and denominator data to NHSN, received guidance from the CDC, and implemented an evidence-based intervention package that included chlorhexidine use for catheter exit-site care, staff training and competency assessments focused on catheter care and aseptic technique, hand hygiene and vascular access care audits, and feedback of infection and adherence rates to staff. Crude and modeled BSI and access-related BSI rates. Up to 12 months of preintervention (January 2009 through December 2009) and 15 months of intervention period (January 2010 through March 2011) data from participating centers were analyzed. Segmented regression analysis was used to assess changes in BSI and access-related BSI rates during the preintervention and intervention periods. Most (65%) participating facilities were hospital based. Pooled mean BSI and access-related BSI rates were 1.09 and 0.73 events per 100 patient-months during the preintervention period and 0.89 and 0.42 events per 100 patient-months during the intervention period, respectively. Modeled rates decreased 32% (P = 0.01) for BSIs and 54% (P facilities were not representative of all outpatient hemodialysis centers nationally. There was no control arm to this quality improvement project. Facilities participating in a collaborative successfully decreased their BSI and access-related BSI rates. The decreased rates appeared to be maintained in the intervention

  15. ORNL Neutron Sciences Annual Report for 2007

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, Ian S [ORNL; Horak, Charlie M [ORNL; Counce, Deborah Melinda [ORNL; Ekkebus, Allen E [ORNL

    2008-07-01

    This is the first annual report of the Oak Ridge National Laboratory Neutron Sciences Directorate for calendar year 2007. It describes the neutron science facilities, current developments, and future plans; highlights of the year's activities and scientific research; and information on the user program. It also contains information about education and outreach activities and about the organization and staff. The Neutron Sciences Directorate is responsible for operation of the High Flux Isotope Reactor and the Spallation Neutron Source. The main highlights of 2007 were highly successful operation and instrument commissioning at both facilities. At HFIR, the year began with the reactor in shutdown mode and work on the new cold source progressing as planned. The restart on May 16, with the cold source operating, was a significant achievement. Furthermore, measurements of the cold source showed that the performance exceeded expectations, making it one of the world's most brilliant sources of cold neutrons. HFIR finished the year having completed five run cycles and 5,880 MWd of operation. At SNS, the year began with 20 kW of beam power on target; and thanks to a highly motivated staff, we reached a record-breaking power level of 183 kW by the end of the year. Integrated beam power delivered to the target was 160 MWh. Although this is a substantial accomplishment, the next year will bring the challenge of increasing the integrated beam power delivered to 887 MWh as we chart our path toward 5,350 MWh by 2011.

  16. Tradeable carbon permits

    International Nuclear Information System (INIS)

    Koutstaal, P.R.

    1995-01-01

    The research project on tradeable carbon permits has focused on three elements. First of all, the practical implications of designing a system of tradeable emission permits for reducing CO2 has been studied. In the second part, the consequences of introducing a system of tradeable carbon permits for entry barriers have been considered. Finally, the institutional requirements and welfare effects of coordination of CO2 abatement in a second-best world have been examined

  17. Operational improvement to the flue gas cleaning system in radioactive waste incineration facilities

    International Nuclear Information System (INIS)

    Zheng Bowen; Li Xiaohai; Wang Peiyi

    2012-01-01

    After years of operation, some problems, such as corrosion and waste water treatment, have been found in the first domestic whole-scale radioactive waste incineration facility. According to the origin of the problems, the flue gas cleaning system has been optimized and improved in terms of technical process, material and structure. It improves the operational stability, extends the equipment life-time, and also reduces the amount of secondary waste. In addition, as major sources of problems, waste management, operational experiences and information exchange deserve more attention. (authors)

  18. 50 CFR 679.4 - Permits.

    Science.gov (United States)

    2010-10-01

    ... this section, with the exception that an IFQ hired master permit or a CDQ hired master permit need not... program permit or card type is: Permit is in effect from issue date through the end of: For more... section (C) Halibut & sablefish hired master permits Specified fishing year Paragraph (d)(2) of this...

  19. The activation system Easy 2007

    International Nuclear Information System (INIS)

    Forrest, R.A.; Kopecky, J.

    2007-01-01

    Full text of publication follows: Safety and waste management of materials for ITER, IFMIF and future power plants require detailed knowledge of the activation caused by irradiation with neutrons, or in the case of IFMIF, deuterons. The European Activation System (EASY) has been developed for such calculations and a new version (EASY-2007) was released earlier this year. This contains a large amount of nuclear data in the European Activation File (EAF-2007) covering neutron-, deuteron- and proton-induced cross sections (about 200,000 reactions have data extending up to 60 MeV), decay data (2,231 nuclides) and subsidiary data on e.g. biological hazards. These data are input to the FISPACT inventory code used to calculate the activation. Recent work has concentrated on the validation of EASY-2007 using integral and differential measurements; these studies are summarised showing examples of reactions agreeing with the experimental results and cases where the library data require further improvement. Integral data above 20 MeV are especially important in improving the library for IFMIF calculations. Using a previous version of EASY a study of the activation of all the elements enabled the identification of the reactions important in producing activation below 20 MeV. The list of 1,340 neutron-reactions producing the dominant radio-nuclides enables further studies to be focused on the important data. This study made extensive use of importance diagrams. This work has been extended to cover the energy region up to 60 MeV, and the new important radionuclides and reactions in this energy range are reported. Although the data above 20 MeV are important for IFMIF and are of interest because of their novelty, the traditional energy region below 20 MeV remains of great importance for most fusion applications. The testing of such large data libraries for reactions with no experimental data is necessary and results from the use of the recently developed method of Statistical

  20. Enova results and activities report 2007

    Energy Technology Data Exchange (ETDEWEB)

    2008-07-01

    entitled 'Energy Management - companies in network' has been discontinued, and its core activities have been moved to projects under the investment support program. During the past year, Enova expanded its efforts aimed at Norwegian municipalities. In addition to the subsidy program 'Municipal energy and climate planning', Enova has developed both guides and courses in energy and climate planning for the municipalities. In 2007, the Ministry of Local Government and Regional Development and the Ministry of Petroleum and Energy entrusted Enova with the task of developing and conducting courses in energy and climate planning. Enova has also made further strides in 2007 in the program it offers to households. Enova will implement a new strategy aimed at households in 2008, 'Enova Recommends', which is a policy instrument whereby Enova will work together with market actors to ensure that consumers receive information about the energy qualities of the products they buy, at the time when they are purchased. In 2007, Enova's campaign for children and young people, the Rainmakers, has been presented in children's TV programs, on the regnmakerne.no website, in primary schools, at housing fairs and in the energy centre at the Hunderfossen family theme park. Media focus on Enova's activities reached new heights in 2007. A major image campaign was carried out in the autumn, aimed at national and municipal decision makers, as well as business and industry. Knowledge about Enova, the organisation's tasks and achievements, improved in 2007. Enova's website has been restructured and improved in 2007 and will be re-launched in 2008. Enova's projects reduce CO{sub 2} emissions. Given certain assumptions, the total effect of Enova's projects could reduce oil consumption by an estimated 230,000 tonnes, and CO{sub 2} emissions by 3.3 million tonnes. This is equivalent to a cost of measures in excess of 7.5 euros per tonne of CO{sub 2}, assuming alternative gas power coverage. Available funds in

  1. Conference report : PERM-IT '97

    International Nuclear Information System (INIS)

    Smyth, V.; Yeabsley, A.

    1997-01-01

    The PERM-IT conference (Physics Engineering Radiation Medicine with a special emphasis on Information Technology) which was held in Adelaide with an attendance of about 250, was the joint annual meeting of the Australasian Radiation Protection Society, the Australasian College of Physical Scientists and Engineers in Medicine, the College of Biomedical Engineers of the Institution of Engineers Australia and the Society for Medical and Biological Engineering. The program was organised with three parallel sessions running most of the time, with plenary sessions for items of particular interest featuring keynote speakers from around the world. Attendance at this conference allowed the opportunity to meet with colleagues in other regulatory agencies, and Australia has a number of these. But what should be done about radioactive waste? A universal groan is raised by radiation protection regulatory authority staff at this question. Plans are afoot to develop a whole of Australia radioactive waste repository with both burial and above ground facilities. An announcement on the suitability of various sites in order of preference is expected, but in the meantime, facilities are fragemented. Discussions were held with staff from the radiation standards section of the Australian Radiation Laboratory who face similar problems to NRL including reducing funding, the move to cost recovery, and working towards quality managment accreditation. Plans for a further intercomparison between the Australian and NZ primary standards are being made. (author)

  2. Improvement in Outflow Facility by Two Novel Microinvasive Glaucoma Surgery Implants

    Science.gov (United States)

    Hays, Cassandra L.; Gulati, Vikas; Fan, Shan; Samuelson, Thomas W.; Ahmed, Iqbal Ike K.; Toris, Carol B.

    2014-01-01

    Purpose. To determine improvement in outflow facility (C) in human anterior segments implanted with a novel Schlemm's canal scaffold or two trabecular micro-bypasses. Methods. Human anterior segments were isolated from 12 pairs of eyes from donors with no history of ocular disease and then perfused at 50, 40, 30, 20, and 10 mm Hg pressures for 10 minutes each. Baseline C was calculated from perfusion pressures and flow rates. The scaffold was implanted into Schlemm's canal of one anterior segment, and two micro-bypasses were implanted three clock-hours apart in the contralateral anterior segment. Outflow facility and resistance were compared at various standardized perfusion pressures and between each device. Results. Compared to baseline, C increased by 0.16 ± 0.12 μL/min/mm Hg (74%) with the scaffold, and 0.08 ± 0.12 μL/min/mm Hg (34%) with two micro-bypasses. The scaffold increased C at perfusion pressures of 50, 40, 30, and 20 mm Hg (P glaucoma. PMID:24550367

  3. 77 FR 60041 - Heating, Cooling, and Lighting Standards for Bureau-Funded Dormitory Facilities

    Science.gov (United States)

    2012-10-02

    ... 1076-AF10 Heating, Cooling, and Lighting Standards for Bureau-Funded Dormitory Facilities AGENCY... confirming the interim final rule published and effective on May 24, 2012, addressing heating, cooling, and... identified in the ``School Facilities Design Handbook'' (handbook) dated March 30, 2007, respecting heating...

  4. State Licenses & Permits

    Data.gov (United States)

    Small Business Administration — Starting a business? Confused about whether you need a business license or permit? Virtually every business needs some form of license or permit to operate legally....

  5. Areva reference document 2007; Areva document de reference 2007

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-07-01

    This reference document contains information on the AREVA group's objectives, prospects and development strategies, particularly in Chapters 4 and 7. It contains also information on the markets, market shares and competitive position of the AREVA group. Content: 1 - Person responsible for the reference document and persons responsible for auditing the financial statements; 2 - Information pertaining to the transaction (not applicable); 3 - General information on the company and its share capital: Information on Areva, Information on share capital and voting rights, Investment certificate trading, Dividends, Organization chart of AREVA group companies, Equity interests, Shareholders' agreements; 4 - Information on company operations, new developments and future prospects: Overview and strategy of the AREVA group, The Nuclear Power and Transmission and Distribution markets, The energy businesses of the AREVA group, Front End division, Reactors and Services division, Back End division, Transmission and Distribution division, Major contracts 140 Principal sites of the AREVA group, AREVA's customers and suppliers, Sustainable Development and Continuous Improvement, Capital spending programs, Research and Development programs, Intellectual Property and Trademarks, Risk and insurance; 5 - Assets financial position financial performance: Analysis of and comments on the group's financial position and performance, Human Resources report, Environmental report, Consolidated financial statements 2007, Notes to the consolidated financial statements, Annual financial statements 2007, Notes to the corporate financial statements; 6 - Corporate governance: Composition and functioning of corporate bodies, Executive compensation, Profit-sharing plans, AREVA Values Charter, Annual Ordinary General Meeting of Shareholders of April 17, 2008; 7 - Recent developments and future prospects: Events subsequent to year-end closing for 2007, Outlook; Glossary; table of

  6. Closure of hazardous and mixed radioactive waste management units at DOE facilities

    International Nuclear Information System (INIS)

    1990-06-01

    This is document addresses the Federal regulations governing the closure of hazardous and mixed waste units subject to Resource Conservation and Recovery Act (RCRA) requirements. It provides a brief overview of the RCRA permitting program and the extensive RCRA facility design and operating standards. It provides detailed guidance on the procedural requirements for closure and post-closure care of hazardous and mixed waste management units, including guidance on the preparation of closure and post-closure plans that must be submitted with facility permit applications. This document also provides guidance on technical activities that must be conducted both during and after closure of each of the following hazardous waste management units regulated under RCRA

  7. Energy white paper 2007: the British strategy to take up the energy challenge; Energy white paper 2007: la strategie britannique pour relever le defi de l'energie

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    Following the energy policy review published in 2006 by the Department for Trade and Industry (DTI), the Energy White Paper 2007, published on May 23, 2007, gathers all measures preconized in this domain. This document recalls, first, the objectives and priorities of the British government at the international, national, regional and local scales, as already clearly explained in previous DTI publications. This white book announces also some new measures and the launching of new public hearings about other measures in view. All in all, 18 hearings are announced which deal with various topics, from the new nuclear power plants to the reform of renewables obligations, the organization of big energy projects or the dismantling of offshore energy facilities. This document recalls the objective of the government and describes the British international policy in the domain of energy. It presents the measures for the fight against climatic change (energy conservation, development of clean energies, decentralized energy production), for warranting the security of supplies (diversification of offer, improvement of networks, planning of energy projects) and, in particular, the proposals of the government concerning the transportation sector and the fight against energy paucity. It stresses also on the importance of R and D and on the British authority in energy technologies. Finally, it gathers the reactions of the most representative actors of the British energy sector. (J.S.)

  8. Permit.LOA table

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This table includes the effective dates by vessel and permit number for each issued letter of authorization (LOA) by the Permit Office (APSD)

  9. Air pollution control system testing at the DOE offgas components test facility

    International Nuclear Information System (INIS)

    Burns, D.B.; Speed, D.; VanPelt, W.; Burns, H.H.

    1997-01-01

    In 1997, the Department of Energy (DOE) Savannah River Site (SRS) plans to begin operation of the Consolidated Incineration Facility (CIF) to treat solid and liquid RCRA hazardous and mixed wastes. The Savannah River Technology Center (SRTC) leads an extensive technical support program designed to obtain incinerator and air pollution control equipment performance data to support facility start-up and operation. A key component of this technical support program includes the Offgas Components Test Facility (OCTF), a pilot-scale offgas system test bed. The primary goal for this test facility is to demonstrate and evaluate the performance of the planned CIF Air Pollution Control System (APCS). To accomplish this task, the OCTF has been equipped with a 1/10 scale CIF offgas system equipment components and instrumentation. In addition, the OCTF design maximizes the flexibility of APCS operation and facility instrumentation and sampling capabilities permit accurate characterization of all process streams throughout the facility. This allows APCS equipment performance to be evaluated in an integrated system under a wide range of possible operating conditions. This paper summarizes the use of this DOE test facility to successfully demonstrate APCS operability and maintainability, evaluate and optimize equipment and instrument performance, and provide direct CIF start-up support. These types of facilities are needed to permit resolution of technical issues associated with design and operation of systems that treat and dispose combustible hazardous, mixed, and low-level radioactive waste throughout and DOE complex

  10. Federal Fisheries Permit (FFP)/ Federal Processor Permit (FPP) Permit Program

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Federal Fisheries Permit (FFP) is required for vessels of the United States which are used to fish for groundfish in the Gulf of Alaska or Bering Sea and...

  11. French experience of regulation and operation on reprocessing facilities of LWR spent fuels

    Energy Technology Data Exchange (ETDEWEB)

    Mercier, J P [DES/SESUL (France)

    1992-02-01

    This presentation describes the French experience of regulation and operation on reprocessing facilities: how the safety assessment was made of UP3-A plant of the La Hague establishment for the building permit and operating license within the context of French nuclear regulations and the national debate on the need for reprocessing. Other factors discussed are how the public was involved, how the regulations were improved in the process and what the different stages of commissioning consisted of. In the design studies of a reprocessing facility, three complementary approaches are used: - observance of regulations born of technical considerations, and good practice, - analysis of the hazards, using deterministic and probabilistic methods, within the framework of a safety report, - review of experience feedback from such a facility or like plants. The design of the facility must permit the prevention of accidents and limit their consequences. Moreover, during all foreseeable cases (normal operating, incidents and accidents), the safety of the staff, the public and the environment with regard to consequences of radioactive releases and ionising radiations must be ensured. In the evaluation of these consequences, the approach used is voluntarily pessimistic in order to take into account every possible case. It is based on the main following principles: definition of the events considered for the dimensioning of the facility; redundancy and diversification; defense in depth which consists of the multiplication of the barriers. The experience feedback comes, on the one hand from operator's findings aiming at improving its facility, on the other hand from incidents, the lessons of which being taken into account after careful analysis. These incidents are analyzed by the Safety Authority upon presentation of the data by the operator and on site findings of inspections. In other respects, the aim of inspections is to check that the plant and its operating practices are

  12. Nuclear energy: Environmental issues at DOE's nuclear defense facilities

    International Nuclear Information System (INIS)

    1986-01-01

    GAO's review of nine Department of Energy defense facilities identified a number of significant environmental issues: (1) eight facilities have groundwater contaminated with radioactive and/or hazardous substances to high levels; (2) six facilities have soil contamination in unexpected areas, including offsite locations; (3) four facilities are not in full compliance with the Clean Water Act; and (4) all nine facilities are significantly changing their waste disposal practices to obtain a permit under the Resource Conservation and Recovery Act. GAO is recommending that DOE develop and overall groundwater and soil protection strategy that would provide a better perspective on the environmental risks and impacts associated with operating DOE's nuclear defense facilities. GAO also recommends that DOE allow outside independent inspections of the disposal practices used for any waste DOE self-regulates and revise its order governing the management of hazardous and mixed waste

  13. Resource Conservation and Recovery Act, Part B Permit Application [for the Waste Isolation Pilot Plant (WIPP)]. Chapter D, Appendix D1 (conclusion): Volume 3, Revision 1.0

    Energy Technology Data Exchange (ETDEWEB)

    1992-06-01

    This report, Part B (Vol. 3) of the permit application for the WIPP facility, contains information related to the site characterization of the facility, including geology, design, rock salt evaluations, maps, drawings, and shaft excavations. (CBS)

  14. Applicability of the 5S management method for quality improvement in health-care facilities: a review.

    Science.gov (United States)

    Kanamori, Shogo; Shibanuma, Akira; Jimba, Masamine

    2016-01-01

    The 5S management method (where 5S stands for sort, set in order, shine, standardize, and sustain) was originally implemented by manufacturing enterprises in Japan. It was then introduced to the manufacturing sector in the West and eventually applied to the health sector for organizing and standardizing the workplace. 5S has recently received attention as a potential solution for improving government health-care services in low- and middle-income countries. We conducted a narrative literature review to explore its applicability to health-care facilities globally, with a focus on three aspects: (a) the context of its application, (b) its impacts, and (c) its adoption as part of government initiatives. To identify relevant research articles, we researched public health databases in English, including CINAHL, PubMed, ScienceDirect, and Web of Science. We found 15 of the 114 articles obtained from the search results to be relevant for full-text analysis of the context and impacts of the 5S application. To identify additional information particularly on its adoption as part of government initiatives, we also examined other types of resources including reference books, reports, didactic materials, government documents, and websites. The 15 empirical studies highlighted its application in primary health-care facilities and a wide range of hospital areas in Brazil, India, Jordan, Senegal, Sri Lanka, Tanzania, the UK, and the USA. The review also found that 5S was considered to be the starting point for health-care quality improvement. Ten studies presented its impacts on quality improvements; the changes resulting from the 5S application were classified into the three dimensions of safety, efficiency, and patient-centeredness. Furthermore, 5S was adopted as part of government quality improvement strategies in India, Senegal, Sri Lanka, and Tanzania. 5S could be applied to health-care facilities regardless of locations. It could be not only a tool for health workers and

  15. DARA Solid Storage Facility evaluation and recommendations, Y-12 Bear Creek Burial Grounds, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Barton, W.D. III; Hughey, J.C.

    1992-08-01

    The Disposal Area Remedial Action (DARA) Solid Storage Facility (SSF) is a rectangular concrete vault with two high-density Polyethlene (HDPE) liners and covered with a metal building. The SSF was originally designed and constructed to receive saturated sediments from the excavation of the Oil Retention Ponds and Tributary 7 at the Oak Ridge Y-12 Plant. The sediments placed in the SSF were generally high-water-content soils contaminated with polychlorinated biphenyls (PCBs) and volatile organic carbons. The facility was intended to dewater the sediments by allowing the free water to percolate to a 6-in. sand layer covering the entire floor of the facility. The sand layer then drained into sumps located at the east and west ends of the facility. An application for a Part-B Permit was submitted to the state of Tennessee in February 1992 (MMES 1992a). This report is being submitted to support approval of that permit application and to address certain issues known to the regulators regarding this facility

  16. Mixed waste disposal facility at the Nevada Test Site

    International Nuclear Information System (INIS)

    Dickman, P.T.; Kendall, E.W.

    1987-01-01

    In 1984, a law suit brought against DOE resulted in the requirement that DOE be subject to regulation by the state and US Environmental Protection Agency (EPA) for all hazardous wastes, including mixed wastes. Therefore, all DOE facilities generating, storing, treating, or disposing of mixed wastes will be regulated under the Resource Conservation and Recovery Act (RCTA). In FY 1985, DOE Headquarters requested DOE low-level waste (LLW) sites to apply for a RCRA Part B Permit to operate radioactive mixed waste facilities. An application for the Nevada Test Site (NTS) was prepared and submitted to the EPA, Region IX in November 1985 for review and approval. At that time, the state of Nevada had not yet received authorization for hazardous wastes nor had they applied for regulatory authority for mixed wastes. In October 1986, DOE Nevada Operations Office was informed by the Rocky Flats Plant that some past waste shipments to NTS contained trace quantities of hazardous substances. Under Colorado law, these wastes are defined as mixed. A DOE Headquarters task force was convened by the Under Secretary to investigate the situation. The task force concluded that DOE has a high priority need to develop a permitted mixed waste site and that DOE Nevada Operations Office should develop a fast track project to obtain this site and all necessary permits. The status and issues to be resolved on the permit for a mixed waste site are discussed

  17. Resource Conservation and Recovery Act Part B permit application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 7: Revision 1.0

    Energy Technology Data Exchange (ETDEWEB)

    1992-07-01

    This permit application (Vol. 7) for the WIPP facility contains appendices related to the following information: Ground water protection; personnel; solid waste management; and memorandums concerning environmental protection standards.

  18. STARFIRE remote maintenance and reactor facility concept

    International Nuclear Information System (INIS)

    Graumann, D.W.; Field, R.E.; Lutz, G.R.; Trachsel, C.A.

    1981-01-01

    A total remote maintenance facility has been designed for all equipment located within the reactor building and hot cell, although operational flexibility has been provided by design of the reactor shielding such that personnel access into the reactor building within 24 hours after reactor shutdown is possible. The reactor design permits removal and replacement of all components if necessary, however, the vacuum pumps, isolation valves and blanket require scheduled, routine maintenance. Reactor scheduled maintenance does not dominate annual plant downtime, therefore, several scheduled operations can be added without affecting reactor availability. The maintenance facilities consist of the reactor building, the hot cell, the reactor service area and the remote maintenance control room. The reactor building contains the reactor, selected support system modules, and required maintenance equipment. The reactor and the support systems are maintained with (1) equipment that is mounted on a monorail system; (2) overhead cranes; and (3) bridge-mounted electromechanical manipulators. The hot cell is located outside of the reactor building to localize contamination products and permit independent operation. An equipment air lock connects the reactor building to the hot cell

  19. Present status of decommissioning in the Musashi Reactor Facility (4)

    International Nuclear Information System (INIS)

    Uchiyama, Takafumi; Tanzawa, Tomio; Mitsuhashi, Ishi; Morishima, Kayoko; Matsumoto, Tetsuo

    2012-01-01

    The decommissioning of the Musashi reactor was decided in 2003. Permanent shutdown of the reactor and stopping the operational functions were conducted in 2004. Transportation of the spent fuels was finished in 2006. After 2007, the system and equipment stopping the functions were stored as installed in the reactor facility as radioactive wastes. After separating nonradioactive wastes such as concretes from radioactive wastes with a contamination test, stopping the functions of liquid waste management facility was performed with newly installed drainage facility for radioisotope use in 2010. Solid waste management facility was also dismantled and removed in the same way as liquid waste management facility in 2011. Radioactive wastes packed in containers were moved and stored in the reactor facility. (T. Tanaka)

  20. CEA financial report 2007; CEA rapport financier 2007

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    This document provides financial data on the CEA for the year 2007. The management report (budget, resources, expenditures) and the accounting are detailed. The main management events of the year 2007 are presented. (A.L.B.)

  1. 75 FR 2445 - Chemical Facility Anti-Terrorism Standards

    Science.gov (United States)

    2010-01-15

    ... include trade secrets, confidential commercial information, Chemical-terrorism Vulnerability Information... and submit an online data collection (the Top-Screen) to DHS. The Department uses the facility's Top... required to submit Top-Screens. See 72 FR 65397-65398. \\2\\ Among other things, the November 2007 rule...

  2. AREVA in 2007, growth and profitability

    International Nuclear Information System (INIS)

    2008-01-01

    This document is the 2007 activity report of the Areva group, the nuclear division of which is Number 1 worldwide in the front end of the nuclear cycle, in pressurized water reactors (in terms of installed capacity), and in the treatment and recycling of used nuclear fuel. The Transmission and Distribution division is Number 1 worldwide in market management software and grid management software, number 2 in high voltage products, and number 3 in medium voltage products. Content: Message from the Chairman of the Supervisory Board; Message from the Chief Executive Officer; Key data; 2007 highlights; Corporate governance; Organization of the group; Share information and shareholder relations; Solutions for CO 2 -free power generation; Solutions for reliable electricity transmission and distribution; Governance; Continuous improvement; Financial performance; Innovation; Customer satisfaction; Commitment to employees; Environmental protection; Risk management and prevention; Dialogue and consensus building; Community involvement; Auditors' report; Reporting methodology; Data verified in 2007; Glossary; and 'to learn more' references

  3. AREVA in 2007, growth and profitability

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-07-01

    This document is the 2007 activity report of the Areva group, the nuclear division of which is Number 1 worldwide in the front end of the nuclear cycle, in pressurized water reactors (in terms of installed capacity), and in the treatment and recycling of used nuclear fuel. The Transmission and Distribution division is Number 1 worldwide in market management software and grid management software, number 2 in high voltage products, and number 3 in medium voltage products. Content: Message from the Chairman of the Supervisory Board; Message from the Chief Executive Officer; Key data; 2007 highlights; Corporate governance; Organization of the group; Share information and shareholder relations; Solutions for CO{sub 2}-free power generation; Solutions for reliable electricity transmission and distribution; Governance; Continuous improvement; Financial performance; Innovation; Customer satisfaction; Commitment to employees; Environmental protection; Risk management and prevention; Dialogue and consensus building; Community involvement; Auditors' report; Reporting methodology; Data verified in 2007; Glossary; and 'to learn more' references.

  4. AREVA in 2007, growth and profitability

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-07-01

    This document is the 2007 activity report of the Areva group, the nuclear division of which is Number 1 worldwide in the front end of the nuclear cycle, in pressurized water reactors (in terms of installed capacity), and in the treatment and recycling of used nuclear fuel. The Transmission and Distribution division is Number 1 worldwide in market management software and grid management software, number 2 in high voltage products, and number 3 in medium voltage products. Content: Message from the Chairman of the Supervisory Board; Message from the Chief Executive Officer; Key data; 2007 highlights; Corporate governance; Organization of the group; Share information and shareholder relations; Solutions for CO{sub 2}-free power generation; Solutions for reliable electricity transmission and distribution; Governance; Continuous improvement; Financial performance; Innovation; Customer satisfaction; Commitment to employees; Environmental protection; Risk management and prevention; Dialogue and consensus building; Community involvement; Auditors' report; Reporting methodology; Data verified in 2007; Glossary; and 'to learn more' references.

  5. 77 FR 72431 - Application for a Presidential Permit To Operate and Maintain Pipeline Facilities on the Border...

    Science.gov (United States)

    2012-12-05

    ... principle place of business at 333 Clay Street, Suite 1600, Houston Texas, 77002. Plains LPG is a subsidiary... with regard to whether issuing a new Presidential Permit reflecting the corporate succession and...

  6. 77 FR 72430 - Application for a Presidential Permit To Operate and Maintain Pipeline Facilities on the Border...

    Science.gov (United States)

    2012-12-05

    ... business at 333 Clay Street, Suite 1600, Houston Texas, 77002. Plains LPG is a subsidiary of Plains All... whether issuing a new Presidential Permit reflecting the corporate succession and authorizing Plains LPG...

  7. Public debt improves the stability of exchange rates in developing countries? The specific case of news European members (2004 and 2007

    Directory of Open Access Journals (Sweden)

    Thibault Cuénoud

    2011-06-01

    Full Text Available The aim of this paper is to speak about the current situation in Central and Eastern European countries (CEEC. The majority of them have been entering in European Union in 2004 and 2007. This step has been increasing their international attractiveness and improves their economic growth. However, they must stabilize exchange rate to sustain their foreign direct investment attraction. Two strategies are adopting about the regulation of exchange rate. Bulgarian, Estonia, Latvia, Lithuania Slovenia and Slovakia are entering in Exchange Rate Mechanism 2 (ERM2 to adopt quickly euro currency (it is now the case for Slovenia in 2007, Slovakia in 2009 and Estonia in 2011. Hungary, Poland, Czech Republic and Romania prefer only to stabilize their currency for the moment. Despite the strong economic dynamic of these countries before the Subprime crisis, the impact reveals the incapacity for several of them to improve currencies stabilities. The theoretical approach about Mundell-Fleming trilemma informs the necessity to scarify monetary policy in a context of free financial market and fixed exchange rate. In a reality, the capacity to use fiscal policy appears supplementary indeed more efficient.

  8. Improving pedestrian facilities in congested urban areas: a case study of Chennai city

    Science.gov (United States)

    Subramanyam, B.; Prasanna Kumar, R.

    2017-07-01

    Traffic congestion and lack of public pedestrian space are some problems faced by most urban metropolises. Conventionally walking has been a mode of transportation in Indian cities. The percentage of pedestrians may vary from 16 to 57 depending upon the city. Encounters between vehicular traffic and pedestrian traffic are at its rise currently. Rapid industrialization and urbanization in India has resulted in neglecting of pedestrian facilities. Consequently pedestrian are at greater risk for their safety more especially in the commercial zones of large cities. A change in perspective spotlight will create a sense of awareness that the pedestrian traffic is also vital as the vehicular traffic. Soothing the traffic would moderately cut the driving expediency but the pedestrians will get a much safer and peaceful route to their terminuses. Safety and comfort are the two pans of a balance while considering the pedestrian traffic. Considering these aspects, this study deals a study in improving pedestrian facilities by analysing the existing skeleton of the selected locations. The adequacy of facility is checked based on IRC latest guidelines and counteractive measures are postulated.

  9. The Synchrotron Radiation Facility ESFR in Grenoble

    International Nuclear Information System (INIS)

    Haensel, R.

    1994-01-01

    The European Synchrotron Radiation Facility (ESFR) is the first synchrotron radiation source of the 3-th generation for Roentgen radiations.It permits a new series of experiments in the domains of physics, chemistry, materials studies, micromechanics, biology, medicine and crystallography. The main part of device represents the 850 meter storage ring of 6 GeV electrons. (MSA)

  10. 9 CFR 93.204 - Import permits for poultry and for poultry test specimens for diagnostic purposes; and...

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Import permits for poultry and for poultry test specimens for diagnostic purposes; and reservation fees for space at quarantine facilities... SERVICE, DEPARTMENT OF AGRICULTURE EXPORTATION AND IMPORTATION OF ANIMALS (INCLUDING POULTRY) AND ANIMAL...

  11. RCRA Part A and Part B Permit Application for Waste Management Activities at the Nevada Test Site

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Protection and Technical Services

    2009-09-30

    This permit application provides facility information on the design, processes, and security features associated with the proposed Mixed Waste Disposal Unit. The unit will receive and dispose of onsite and offsite containerized low-level mixed waste (LLMW) that has an approved U.S. Department of Energy nexus.

  12. RCRA Part A and Part B Permit Application for Waste Management Activities at the Nevada Test Site

    International Nuclear Information System (INIS)

    2009-01-01

    This permit application provides facility information on the design, processes, and security features associated with the proposed Mixed Waste Disposal Unit. The unit will receive and dispose of onsite and offsite containerized low-level mixed waste (LLMW) that has an approved U.S. Department of Energy nexus.

  13. Enova results and activities report 2007

    Energy Technology Data Exchange (ETDEWEB)

    2008-07-01

    program entitled 'Energy Management - companies in network' has been discontinued, and its core activities have been moved to projects under the investment support program. During the past year, Enova expanded its efforts aimed at Norwegian municipalities. In addition to the subsidy program 'Municipal energy and climate planning', Enova has developed both guides and courses in energy and climate planning for the municipalities. In 2007, the Ministry of Local Government and Regional Development and the Ministry of Petroleum and Energy entrusted Enova with the task of developing and conducting courses in energy and climate planning. Enova has also made further strides in 2007 in the program it offers to households. Enova will implement a new strategy aimed at households in 2008, 'Enova Recommends', which is a policy instrument whereby Enova will work together with market actors to ensure that consumers receive information about the energy qualities of the products they buy, at the time when they are purchased. In 2007, Enova's campaign for children and young people, the Rainmakers, has been presented in children's TV programs, on the regnmakerne.no website, in primary schools, at housing fairs and in the energy centre at the Hunderfossen family theme park. Media focus on Enova's activities reached new heights in 2007. A major image campaign was carried out in the autumn, aimed at national and municipal decision makers, as well as business and industry. Knowledge about Enova, the organisation's tasks and achievements, improved in 2007. Enova's website has been restructured and improved in 2007 and will be re-launched in 2008. Enova's projects reduce CO{sub 2} emissions. Given certain assumptions, the total effect of Enova's projects could reduce oil consumption by an estimated 230,000 tonnes, and CO{sub 2} emissions by 3.3 million tonnes. This is equivalent to a cost of measures in excess of 7.5 euros per tonne

  14. Safety problems with abandoned explosive facilities

    International Nuclear Information System (INIS)

    Courtright, W.C.

    1969-01-01

    Procedures were developed for the safe removal of explosive and radioactive contaminated materials structures and drains from abandoned sites, including explosives processing and service buildings with a goal to return the entire area to its natural state and to permit public access. The safety problems encountered in the cleanup and their solutions are applicable to modification and maintenance work in operating explosive facilities. (U.S.)

  15. [Road map for health and safety management systems in healthcare facilities, according to the OHSAS 18001:2007 standard].

    Science.gov (United States)

    Pugliese, F; Albini, E; Serio, O; Apostoli, P

    2011-01-01

    The 81/2008 Act has defined a model of a health and safety management system that can contribute to prevent the occupational health and safety risks. We have developed the structure of a health and safety management system model and the necessary tools for its implementation in health care facilities. The realization of a model is structured in various phases: initial review, safety policy, planning, implementation, monitoring, management review and continuous improvement. Such a model, in continuous evolution, is based on the responsibilities of the different corporate characters and on an accurate analysis of risks and involved norms.

  16. 50 CFR 660.25 - Permits.

    Science.gov (United States)

    2010-10-01

    ... change and the reasons for the request. If the permit requested to be changed to the base permit is..., vessel owner, or permit owner for any reason. The sablefish at-sea processing exemption will expire upon... ownership. (G) For a request to change a permit's ownership that is necessitated by divorce, the individual...

  17. National RF Test Facility as a multipurpose development tool

    International Nuclear Information System (INIS)

    McManamy, T.J.; Becraft, W.R.; Berry, L.A.

    1983-01-01

    Additions and modifications to the National RF Test Facility design have been made that (1) focus its use for technology development for future large systems in the ion cyclotron range of frequencies (ICRF), (2) expand its applicability to technology development in the electron cyclotron range of frequencies (ECRF) at 60 GHz, (3) provide a facility for ELMO Bumpy Torus (EBT) 60-GHz ring physics studies, and (4) permit engineering studies of steady-state plasma systems, including superconducting magnet performance, vacuum vessel heat flux removal, and microwave protection. The facility will continue to function as a test bed for generic technology developments for ICRF and the lower hybrid range of frequencies (LHRF). The upgraded facility is also suitable for mirror halo physics experiments

  18. 41 CFR 102-74.500 - Can Federal agencies disapprove permit applications or cancel issued permits?

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Can Federal agencies disapprove permit applications or cancel issued permits? 102-74.500 Section 102-74.500 Public Contracts and... cancel issued permits? Yes, Federal agencies may disapprove any permit application or cancel an issued...

  19. 1999 Annual Mixed Waste Management Facility Groundwater Correction - Action Report (Volumes I, II, and III)

    International Nuclear Information System (INIS)

    Chase, J.

    2000-01-01

    This Corrective Action Report (CAR) for the Mixed Waste Management Facility (MWMF) is being prepared to comply with the Resource Conservation and Recovery Act (RCRA) Permit Number SC1 890 008 989, dated October 31, 1999. This CAR compiles and presents all groundwater sampling and monitoring activities that are conducted at the MWMF. As set forth in previous agreements with South Carolina Department of Health and Environmental Control (SCDHEC), all groundwater associated with the Burial Ground Complex (BGC) (comprised of the MWMF, Low-Level Radioactive Waste Disposal Facility, and Old Radioactive Waste Burial Ground) will be addressed under this RCRA Permit. This CAR is the first to be written for the MWMF and presents monitoring activities and results as an outcome of Interim Status and limited Permitted Status activities. All 1999 groundwater monitoring activities were conducted while the MWMF was operated during Interim Status. Changes to the groundwater monitoring program were made upon receipt of the RCRA Permit, where feasible. During 1999, 152 single-screened and six multi-screened groundwater monitoring wells at the BGC monitored groundwater quality in the uppermost aquifer as required by the South Carolina Hazardous Waste Management Regulations (SCHWMR), settlement agreements 87-52-SW and 91-51-SW, and RCRA Permit SC1 890 008 989. However, overall compliance with the recently issued RCRA Permit could not be implemented until the year 2000 due to the effective date of the RCRA Permit and scheduling of groundwater monitoring activities. Changes have been made to the groundwater monitoring network to meet Permit requirements for all 2000 sampling events

  20. Supply-side barriers to maternity-care in India: a facility-based analysis.

    Directory of Open Access Journals (Sweden)

    Santosh Kumar

    Full Text Available BACKGROUND: Health facilities in many low- and middle-income countries face several types of barriers in delivering quality health services. Availability of resources at the facility may significantly affect the volume and quality of services provided. This study investigates the effect of supply-side determinants of maternity-care provision in India. METHODS: Health facility data from the District-Level Household Survey collected in 2007-2008 were analyzed to explore the effects of supply-side factors on the volume of delivery care provided at Indian health facilities. A negative binomial regression model was applied to the data due to the count and over-dispersion property of the outcome variable (number of deliveries performed at the facility. RESULTS: Availability of a labor room (Incidence Rate Ratio [IRR]: 1.81; 95% Confidence Interval [CI]: 1.68-1.95 and facility opening hours (IRR: 1.43; CI: 1.35-1.51 were the most significant predictors of the volume of delivery care at the health facilities. Medical and paramedical staff were found to be positively associated with institutional deliveries. The volume of deliveries was also higher if adequate beds, essential obstetric drugs, medical equipment, electricity, and communication infrastructures were available at the facility. Findings were robust to the inclusion of facility's catchment area population and district-level education, health insurance coverage, religion, wealth, and fertility. Separate analyses were performed for facilities with and without a labor room and results were qualitatively similar across these two types of facilities. CONCLUSIONS: Our study highlights the importance of supply-side barriers to maternity-care India. To meet Millennium Development Goals 4 and 5, policymakers should make additional investments in improving the availability of medical drugs and equipment at primary health centers (PHCs in India.

  1. National Pollution Discharge Elimination System (NPDES) All Facility Points, Region 9, 2007, US EPA Region 9

    Data.gov (United States)

    U.S. Environmental Protection Agency — Point geospatial dataset representing locations of NPDES facilities, outfalls/dischargers, waste water treatment plant facilities and waste water treatment plants...

  2. Wii-Fit for Improving Gait and Balance in an Assisted Living Facility: A Pilot Study

    Science.gov (United States)

    Padala, Kalpana P.; Padala, Prasad R.; Malloy, Timothy R.; Geske, Jenenne A.; Dubbert, Patricia M.; Dennis, Richard A.; Garner, Kimberly K.; Bopp, Melinda M.; Burke, William J.; Sullivan, Dennis H.

    2012-01-01

    Objectives. To determine the effects on balance and gait of a Wii-Fit program compared to a walking program in subjects with mild Alzheimer's dementia (AD). Methods. A prospective randomized (1 : 1) pilot study with two intervention arms was conducted in an assisted living facility with twenty-two mild AD subjects. In both groups the intervention occurred under supervision for 30 minutes daily, five times a week for eight weeks. Repeated measures ANOVA and paired t-tests were used to analyze changes. Results. Both groups showed improvement in Berg Balance Scale (BBS), Tinetti Test (TT) and Timed Up and Go (TUG) over 8 weeks. However, there was no statistically significant difference between the groups over time. Intragroup analysis in the Wii-Fit group showed significant improvement on BBS (P = 0.003), and TT (P = 0.013). The walking group showed a trend towards improvement on BBS (P = 0.06) and TUG (P = 0.07) and significant improvement in TT (P = 0.06). Conclusion. This pilot study demonstrates the safety and efficacy of Wii-Fit in an assisted living facility in subjects with mild AD. Use of Wii-Fit resulted in significant improvements in balance and gait comparable to those in the robust monitored walking program. These results need to be confirmed in a larger, methodologically sound study. PMID:22745909

  3. Wii-Fit for Improving Gait and Balance in an Assisted Living Facility: A Pilot Study

    Directory of Open Access Journals (Sweden)

    Kalpana P. Padala

    2012-01-01

    Full Text Available Objectives. To determine the effects on balance and gait of a Wii-Fit program compared to a walking program in subjects with mild Alzheimer’s dementia (AD. Methods. A prospective randomized (1 : 1 pilot study with two intervention arms was conducted in an assisted living facility with twenty-two mild AD subjects. In both groups the intervention occurred under supervision for 30 minutes daily, five times a week for eight weeks. Repeated measures ANOVA and paired t-tests were used to analyze changes. Results. Both groups showed improvement in Berg Balance Scale (BBS, Tinetti Test (TT and Timed Up and Go (TUG over 8 weeks. However, there was no statistically significant difference between the groups over time. Intragroup analysis in the Wii-Fit group showed significant improvement on BBS (P=0.003, and TT (P=0.013. The walking group showed a trend towards improvement on BBS (P=0.06 and TUG (P=0.07 and significant improvement in TT (P=0.006. Conclusion. This pilot study demonstrates the safety and efficacy of Wii-Fit in an assisted living facility in subjects with mild AD. Use of Wii-Fit resulted in significant improvements in balance and gait comparable to those in the robust monitored walking program. These results need to be confirmed in a larger, methodologically sound study.

  4. Provisions against damage in permits of environment-related large facilities

    International Nuclear Information System (INIS)

    Wagner, H.

    1980-01-01

    The author in detail covers the legal treatment of technological risks, especially the roles played by experts and those applying the law, when it comes to the application of uncertain legal terms and criteria of evaluating the principle of provision for damage. He finds that an increasingly more important role was played by the legal evaluation of risks stemming from large technical facilities, in addition to the (socio-)political assessment of the consequences of technologies. For risk assessment, engineers had a primary responsibility, but the evaluation of risk in an overall process of weighing legal assets was a responsibility of lawyers. The residual risk to be tolerated legally (without the compulsory need to make provisions for damage) was to be determined by weighing legal assets, by the principle of adequacy, and by comparative risk assessment. (HSCH) [de

  5. Mixed Waste Management Facility closure at the Savannah River Site

    International Nuclear Information System (INIS)

    Bittner, M.F.

    1991-08-01

    The Mixed Waste Management Facility of the Savannah River Plant received hazardous and solid low level radioactive wastes from 1972 until 1986. Because this facility did not have a permit to receive hazardous wastes, a Resource Conservation and Recovery Act closure was performed between 1987 and 1990. This closure consisted of dynamic compaction of the waste trenches and placement of a 3-foot clay cap, a 2-foot soil cover, and a vegetative layer. Operations of the waste disposal facility, tests performed to complete the closure design, and the construction of the closure cap are discussed herein

  6. Move smoothly to Office 2007 or 2010

    CERN Multimedia

    CERN. Geneva

    2011-01-01

    Overview of the user interface of Office 2007 and Office 2010 programs: Word, Excel, Powerpoint and Outlook. Special attention will be drawn to: changes of the user interface as compared with Office 2003, new features that improve user-productivity. At the beginning of the presentation, the demonstrations will focus on Office 2007, which is available on both Windows XP and Windows 7. Towards the end, the demonstrations will focus on Office 2010, which will soon become the default version of Office on Windows 7. Video and slides of the presentation: http://indico.cern.ch/conferenceDisplay.py?confId=95532-->

  7. Title V Permitting Statistics Inventory

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Title V Permitting Statistics Inventory contains measured and estimated nationwide statistical data, consisting of counts of permitted sources, types of permits...

  8. Improvement in performance and operational experience of 14 UD Pelletron accelerator facility, BARC-TIFR

    International Nuclear Information System (INIS)

    Bhagwat, P.V.

    2002-01-01

    14 UD Pelletron accelerator facility at Mumbai has been operational since 1989. The project MEHIA (Medium Energy Heavy Ion Accelerator) started in 1982 and was formally inaugurated on 30th December 1988. Since then the accelerator has been working round the clock. Improvement in accelerator performance and operational experience are described. (author)

  9. RCRA permit modifications and the functional equivalency demonstration: A case study

    International Nuclear Information System (INIS)

    Kinker, J.; Lyon, W.; Carnes, R.; Loehr, C.; Elsberry, K.; Garcia, P.

    1996-01-01

    Hazardous waste operating permits issued under the Resource Conservation and Recovery Act (RCRA) often impose requirements, typically by reference to the original permit application, that specific components and equipment be used. Consequently, changing these items, even for the purpose of routine maintenance, may first require that the owner/operator request a potentially time-consuming and costly permit modification. However, the owner/operator may demonstrate that a modification is not required because the planned changes are functionally equivalent, as defined by RCRA, to the original specifications embodied by the permit. The Controlled-Air Incinerator at Los Alamos National Laboratory is scheduled for maintenance and improvements that involve replacement of components. The incinerator's carbon adsorption unit/high efficiency particulate air filtration system, in particular, was redesigned to improve reliability and minimize maintenance. A study was performed to determine whether the redesigned unit would qualify as functionally equivalent to the original component. in performing this study, the following steps were taken: (a) the key performance factors were identified; (b) performance data describing the existing unit were obtained; (c) performance of both the existing and redesigned units was simulated; and (d) the performance data were compared to ascertain whether the components could qualify as functionally equivalent

  10. Liquid effluent retention facility final-status groundwater monitoring plan

    International Nuclear Information System (INIS)

    Sweeney, M.D.; Chou, C.J.; Bjornstad, B.N.

    1997-09-01

    The following sections describe the groundwater-monitoring program for the Liquid Effluent Retention Facility (LERF). The LERF is regulated under the Resource Conservation and Recovery Act of 1976 (RCRA). The LERF is included in the open-quotes Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, Permit WA890008967close quotes, (referred to herein as the Permit) (Ecology 1994) and is subject to final-status requirements for groundwater monitoring (WAC 173-303-645). This document describes a RCRA/WAC groundwater detection-monitoring program for groundwater in the uppermost aquifer system at the LERF. This plan describes the LERF monitoring network, constituent list, sampling schedule, statistical methods, and sampling and analysis protocols that will be employed for the LERF. This plan will be used to meet the groundwater monitoring requirements from the time the LERF becomes part of the Permit and through the post-closure care period, until certification of final closure

  11. LLE 2007 Annual Report, October 2006 - September 2007

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2008-01-31

    The laser-fusion research program at the University of Rochester’s Laboratory for Laser Energetics (LLE) is focused on the National Nuclear Security Administration’s (NNSA’s) Campaign-10 inertial confinement fusion (ICF) ignition and experimental support technology, operation of facilities (OMEGA), and the construction of OMEGA EP -- a high energy petawatt laser system. While LLE is the lead laboratory for research into the direct-drive approach to ICF ignition, it also takes a lead role in certain indirect-drive tasks within the National Ignition Campaign. During this past year progress in the laser-fusion research program was made in three principal areas: OMEGA direct drive and indirect-drive experiments and targets; development of diagnostics for experiments on OMEGA, OMEGA EP, and the National Ignition Facility (NIF); and theoretical analysis and design efforts aimed at improving direct-drive-ignition capsule designs and advanced ignition concepts such as fast ignition and shock ignition.

  12. Can contracted out health facilities improve access, equity, and quality of maternal and newborn health services? Evidence from Pakistan.

    Science.gov (United States)

    Zaidi, Shehla; Riaz, Atif; Rabbani, Fauziah; Azam, Syed Iqbal; Imran, Syeda Nida; Pradhan, Nouhseen Akber; Khan, Gul Nawaz

    2015-11-25

    The case of contracting out government health services to non-governmental organizations (NGOs) has been weak for maternal, newborn, and child health (MNCH) services, with documented gains being mainly in curative services. We present an in-depth assessment of the comparative advantages of contracting out on MNCH access, quality, and equity, using a case study from Pakistan. An end-line, cross-sectional assessment was conducted of government facilities contracted out to a large national NGO and government-managed centres serving as controls, in two remote rural districts of Pakistan. Contracting out was specific for augmenting MNCH services but without contractual performance incentives. A household survey, a health facility survey, and focus group discussions with client and spouses were used for assessment. Contracted out facilities had a significantly higher utilization as compared to control facilities for antenatal care, delivery, postnatal care, emergency obstetric care, and neonatal illness. Contracted facilities had comparatively better quality of MNCH services but not in all aspects. Better household practices were also seen in the district where contracting involved administrative control over outreach programs. Contracting was also faced with certain drawbacks. Facility utilization was inequitably higher amongst more educated and affluent clients. Contracted out catchments had higher out-of-pocket expenses on MNCH services, driven by steeper transport costs and user charges for additional diagnostics. Contracting out did not influence higher MNCH service coverage rates across the catchment. Physical distances, inadequate transport, and low demand for facility-based care in non-emergency settings were key client-reported barriers. Contracting out MNCH services at government health facilities can improve facility utilization and bring some improvement in  quality of services. However, contracting out of health facilities is insufficient to increase

  13. Safety and Radiation Protection at Swedish Nuclear Power Plants 2007

    Energy Technology Data Exchange (ETDEWEB)

    2008-07-01

    The safety level of the plants is maintained at an acceptable level. SKI has in its regulatory supervision not found any known deficiencies in the barriers which could result in release of radioactive substances in excess of the permitted levels. SKI considers that improvements have been implemented during the year in the management, control and following up of safety work at the plants. In some cases, SKI has imposed requirements that improvements be made. Extensive measures are under way at the nuclear power plants to comply with the safety requirements in SKI's regulations, SKIFS 2004:2 concerning the design and construction of nuclear power reactors, and the stricter requirements regarding physical protection. Concurrently preparations are underway at eight of the ten units for thermal power increases. At the Forsmark plant considerable efforts have been during the year to correct the deficiencies in the safety culture and quality assurance system that became apparent in 2006. A programme to improve the execution of activities has been established in accordance with SKI's decision. SKI considers that the plant has developed in a positive direction but that there are further possibilities for improvement with regard to internal control. This is amongst other things concerns the areas internal auditing, independent safety review function, and working methods. SKI has had special supervision of the plant since 28 September, 2006. At the Oskarshamn plant work has been carried out to improve the organisation and routines in several areas. The plant has established routines which provide the basis to ensure that decisions are taken in a stringent manner. The quality assurance system has a clearer structure and there is a better defined division of work. Some measures remain to be dealt with in 2008. The Ringhals plant has also worked with attitudes to routines and internal control. SKI considers that the measures have good prerequisites to provide a

  14. Annual Site Environmental Report Sandia National Laboratories, Albuquerque, New Mexico, Calendar year 2007

    Energy Technology Data Exchange (ETDEWEB)

    Agogino, Karen [National Nuclear Security Administration (NNSA), Washington, DC (United States); Sanchez, Rebecca [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2008-09-30

    Sandia National Laboratories, New Mexico (SNL/NM) is a government-owned/contractor-operated facility. Sandia Corporation (Sandia), a wholly owned subsidiary of Lockheed Martin Corporation, manages and operates the laboratory for the U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA). The DOE/NNSA Sandia Site Office (SSO) administers the contract and oversees contractor operations at the site. This annual report summarizes data and the compliance status of Sandia Corporation’s environmental protection and monitoring programs through December 31, 2007. Major environmental programs include air quality, water quality, groundwater protection, terrestrial surveillance, waste management, pollution prevention (P2), environmental restoration (ER), oil and chemical spill prevention, and implementation of the National Environmental Policy Act (NEPA). Environmental monitoring and surveillance programs are required by DOE Order 450.1, Environmental Protection Program (DOE 2007a) and DOE Manual 231.1-1A, Environment, Safety, and Health Reporting (DOE 2007).

  15. State Waste Discharge Permit application, 100-N Sewage Lagoon

    International Nuclear Information System (INIS)

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173--216 (or 173--218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). This document constitutes the State Waste Discharge Permit application for the 100-N Sewage Lagoon. Since the influent to the sewer lagoon is domestic waste water, the State Waste Discharge Permit application for Public Owned Treatment Works Discharges to Land was used. Although the 100-N Sewage Lagoon is not a Public Owned Treatment Works, the Public Owned Treatment Works application is more applicable than the application for industrial waste water. The 100-N Sewage Lagoon serves the 100-N Area and other Hanford Site areas by receiving domestic waste from two sources. A network of sanitary sewer piping and lift stations transfers domestic waste water from the 100-N Area buildings directly to the 100-N Sewage Lagoon. Waste is also received by trucks that transport domestic waste pumped from on site septic tanks and holding tanks. Three ponds comprise the 100-N Sewage Lagoon treatment system. These include a lined aeration pond and stabilization pond, as well as an unlined infiltration pond. Both piped-in and trucked-in domestic waste is discharged directly into the aeration pond

  16. Resource Conservation and Recovery Act Part B permit application

    International Nuclear Information System (INIS)

    1991-02-01

    The Waste Isolation Pilot Plant (WIPP) project was authorized by the Department of Energy National Security and Military Applications of Nuclear Energy Authorization Act of 1980 (Public Law 96-164) as a research and development facility to demonstrate the safe, environmentally sound disposal of transuranic (TRU) radioactive wastes derived from the defense activities of the United States. The WIPP facility is owned and operated by the US Department of Energy (DOE). The TRU waste to be received at WIPP consists largely of such items as laboratory glassware and utensils, tools, scrap metal, shielding, personnel protection equipment, and solidified sludges from the treatment of waste water. Approximately 60 percent of this waste is ''mixed,'' that is, it is also contaminated with hazardous waste or hazardous waste constituents as defined by the Resource Conservation and Recovery Act (RCRA) and by the New Mexico Hazardous Waste Management Regulations (HWMR-5). Therefore, emplacement of TRU mixed waste in the WIPP repository is subject to regulation under HWMR-5 and RCRA. The permit application under the Resource Conservation and Recovery Act for WIPP is divided into five volumes. This document, Volume 1, contains a site and facility description of WIPP; procedures for waste analysis and characterization, testing, monitoring, inspection, and training; hazard prevention, safety and security plans; plans for closure; and a discussion of other applicable laws. Also included are maps, photographs, and diagrams of the facilities and surrounding areas. 180 refs., 75 figs., 24 tabs

  17. Analyzing Turkey's data from TIMSS 2007 to investigate regional disparities in eighth grade science achievement

    Science.gov (United States)

    Erberber, Ebru

    Turkey is expected to be a full member of the European Union (EU) by 2013. In the course of its integration into the EU, Turkey has been simultaneously facing access, quality, and equity issues in education. Over the past decade, substantial progress has been made on increasing the access. However, improving the country's low level of education quality and achieving equity in quality education across the regions continue to be a monumental challenge in Turkey. Most recently, results from the Trends in International Mathematics and Science Study (TIMSS) 2007 indicated that Turkey's educational achievement at the eighth grade, the end of compulsory primary education in Turkey, was far below that of other countries in the EU. Considering Turkey's long standing socioeconomic disparities between the western and eastern parts of the country, the challenges of improving overall education quality are coupled with the challenges of achieving equity in learning outcomes for students across the regions. This dissertation used data from TIMSS 2007 to document the extent of Turkey's regional differences in science achievement at the eighth grade and to investigate factors associated with these differences. Findings from a series of analyses using hierarchical linear models suggested that attempts to increase Turkish students' achievement and close the achievement gaps between regions should target the students in the undeveloped regions, particularly in Southeastern Anatolia and Eastern Anatolia. Designing interventions to improve competency in Turkish and to compensate for the shortcomings of insufficient parental education, limited home educational resources, poor school climate for academic achievement, and inadequate instructional equipment and facilities might be expected to close the regional achievement gaps as well as raise the overall achievement level in Turkey.

  18. 50 CFR 18.31 - Scientific research permits and public display permits.

    Science.gov (United States)

    2010-10-01

    ... the population stock and the marine ecosystem. In determining whether to issue a public display permit... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Scientific research permits and public..., DEPARTMENT OF THE INTERIOR (CONTINUED) TAKING, POSSESSION, TRANSPORTATION, SALE, PURCHASE, BARTER...

  19. Biosecurity and bird movement practices in upland game bird facilities in the United States.

    Science.gov (United States)

    Slota, Katharine E; Hill, Ashley E; Keefe, Thomas J; Bowen, Richard A; Pabilonia, Kristy L

    2011-06-01

    Since 1996, the emergence of Asian-origin highly pathogenic avian influenza subtype H5N1 has spurred great concern for the global poultry industry. In the United States, there is concern over the potential of a foreign avian disease incursion into the country. Noncommercial poultry operations, such as upland game bird facilities in the United States, may serve as a potential source of avian disease introduction to other bird populations including the commercial poultry industry, backyard flocks, or wildlife. In order to evaluate how to prevent disease transmission from these facilities to other populations, we examined biosecurity practices and bird movement within the upland game bird industry in the United States. Persons that held a current permit to keep, breed, or release upland game birds were surveyed for information on biosecurity practices, flock and release environments, and bird movement parameters. Biosecurity practices vary greatly among permit holders. Many facilities allow for interaction between wild birds and pen-reared birds, and there is regular long-distance movement of live adult birds among facilities. Results suggest that upland game bird facilities should be targeted for biosecurity education and disease surveillance efforts.

  20. 25 CFR 170.808 - Can BIA Road Maintenance Program funds be used to improve IRR transportation facilities?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Can BIA Road Maintenance Program funds be used to improve... THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.808 Can BIA Road Maintenance Program funds be used to improve IRR transportation facilities? No. BIA Road...

  1. Construction and operation of an improved radiation calibration facility at Brookhaven National Laboratory. Environmental assessment

    International Nuclear Information System (INIS)

    1994-10-01

    Calibration of instruments used to detect and measure ionizing radiation has been conducted over the last 20 years at Brookhaven National Laboratory's (BNL) Radiation Calibration Facility, Building 348. Growth of research facilities, projects in progress, and more stringent Department of Energy (DOE) orders which involve exposure to nuclear radiation have placed substantial burdens on the existing radiation calibration facility. The facility currently does not meet the requirements of DOE Order 5480.4 or American National Standards Institute (ANSI) N323-1978, which establish calibration methods for portable radiation protection instruments used in the detection and measurement of levels of ionizing radiation fields or levels of radioactive surface contaminations. Failure to comply with this standard could mean instrumentation is not being calibrated to necessary levels of sensitivity. The Laboratory has also recently obtained a new neutron source and gamma beam irradiator which can not be made operational at existing facilities because of geometry and shielding inadequacies. These sources are needed to perform routine periodic calibrations of radiation detecting instruments used by scientific and technical personnel and to meet BNL's substantial increase in demand for radiation monitoring capabilities. To place these new sources into operation, it is proposed to construct an addition to the existing radiation calibration facility that would house all calibration sources and bring BNL calibration activities into compliance with DOE and ANSI standards. The purpose of this assessment is to identify potential significant environmental impacts associated with the construction and operation of an improved radiation calibration facility at BNL

  2. Resource Conservation and Recovery Act: Part B, Permit application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 1, Revison 1.0

    Energy Technology Data Exchange (ETDEWEB)

    1992-03-01

    This report contains information related to the permit application for the WIPP facility. Information is presented on solid waste management; personnel safety; emergency plans; site characterization; applicable regulations; decommissioning; and ground water monitoring requirements.

  3. THE IMPACT OF SHRINKING HANFORD BOUNDARIES ON PERMITS FOR TOXIC AIR POLLUTANT EMISSIONS FROM THE HANFORD 200 WEST AREA

    International Nuclear Information System (INIS)

    JOHNSON, R.E.

    2005-01-01

    This presentation (CE-580. Graduate Seminar) presents a brief description of an approach to use a simpler dispersion modeling method (SCREEN3) in conjunction with joint frequency tables for Hanford wind conditions to evaluate the impacts of shrinking the Hanford boundaries on the current permits for facilities in the 200 West Area. To fulfill requirements for the graduate student project (CE-702. Master's Special Problems), this evaluation will be completed and published over the next two years. Air toxic emissions play an important role in environmental quality and require a state approved permit. One example relates to containers or waste that are designated as Transuranic Waste (TRU), which are required to have venting devices due to hydrogen generation. The Washington State Department of Ecology (Ecology) determined that the filters used did not meet the definition of a ''pressure relief device'' and that a permit application would have to be submitted by the Central Waste Complex (CWC) for criteria pollutant and toxic air pollutant (TAP) emissions in accordance with Washington Administrative Code (WAC) 173-400 and 173-460. The permit application submitted in 2000 to Ecology used Industrial Source Code III (ISCIII) dispersion modeling to demonstrate that it was not possible for CWC to release a sufficient quantity of fugitive Toxic Air Pollutant emissions that could exceed the Acceptable Source Impact Levels (ASILs) at the Hanford Site Boundary. The modeled emission rates were based on the diurnal breathing in and out through the vented drums (approximately 20% of the drums), using published vapor pressure, molecular weight, and specific gravity data for all 600+ compounds, with a conservative estimate of one exchange volume per day (208 liters per drum). Two permit applications were submitted also to Ecology for the Waste Receiving and Processing Facility and the T Plant Complex. Both permit applications were based on the Central Waste Complex approach, and

  4. Hospital to Post-Acute Care Facility Transfers: Identifying Targets for Information Exchange Quality Improvement.

    Science.gov (United States)

    Jones, Christine D; Cumbler, Ethan; Honigman, Benjamin; Burke, Robert E; Boxer, Rebecca S; Levy, Cari; Coleman, Eric A; Wald, Heidi L

    2017-01-01

    Information exchange is critical to high-quality care transitions from hospitals to post-acute care (PAC) facilities. We conducted a survey to evaluate the completeness and timeliness of information transfer and communication between a tertiary-care academic hospital and its related PAC facilities. This was a cross-sectional Web-based 36-question survey of 110 PAC clinicians and staff representing 31 PAC facilities conducted between October and December 2013. We received responses from 71 of 110 individuals representing 29 of 31 facilities (65% and 94% response rates). We collapsed 4-point Likert responses into dichotomous variables to reflect completeness (sufficient vs insufficient) and timeliness (timely vs not timely) for information transfer and communication. Among respondents, 32% reported insufficient information about discharge medical conditions and management plan, and 83% reported at least occasionally encountering problems directly related to inadequate information from the hospital. Hospital clinician contact information was the most common insufficient domain. With respect to timeliness, 86% of respondents desired receipt of a discharge summary on or before the day of discharge, but only 58% reported receiving the summary within this time frame. Through free-text responses, several participants expressed the need for paper prescriptions for controlled pain medications to be sent with patients at the time of transfer. Staff and clinicians at PAC facilities perceive substantial deficits in content and timeliness of information exchange between the hospital and facilities. Such deficits are particularly relevant in the context of the increasing prevalence of bundled payments for care across settings as well as forthcoming readmissions penalties for PAC facilities. Targets identified for quality improvement include structuring discharge summary information to include information identified as deficient by respondents, completion of discharge summaries

  5. Energy white paper 2007: the British strategy to take up the energy challenge

    International Nuclear Information System (INIS)

    2007-01-01

    Following the energy policy review published in 2006 by the Department for Trade and Industry (DTI), the Energy White Paper 2007, published on May 23, 2007, gathers all measures preconized in this domain. This document recalls, first, the objectives and priorities of the British government at the international, national, regional and local scales, as already clearly explained in previous DTI publications. This white book announces also some new measures and the launching of new public hearings about other measures in view. All in all, 18 hearings are announced which deal with various topics, from the new nuclear power plants to the reform of renewables obligations, the organization of big energy projects or the dismantling of offshore energy facilities. This document recalls the objective of the government and describes the British international policy in the domain of energy. It presents the measures for the fight against climatic change (energy conservation, development of clean energies, decentralized energy production), for warranting the security of supplies (diversification of offer, improvement of networks, planning of energy projects) and, in particular, the proposals of the government concerning the transportation sector and the fight against energy paucity. It stresses also on the importance of R and D and on the British authority in energy technologies. Finally, it gathers the reactions of the most representative actors of the British energy sector. (J.S.)

  6. Simulation of facility operations and materials accounting for a combined reprocessing/MOX fuel fabrication facility

    International Nuclear Information System (INIS)

    Coulter, C.A.; Whiteson, R.; Zardecki, A.

    1991-01-01

    We are developing a computer model of facility operations and nuclear materials accounting for a facility that reprocesses spent fuel and fabricates mixed oxide (MOX) fuel rods and assemblies from the recovered uranium and plutonium. The model will be used to determine the effectiveness of various materials measurement strategies for the facility and, ultimately, of other facility safeguards functions as well. This portion of the facility consists of a spent fuel storage pond, fuel shear, dissolver, clarifier, three solvent-extraction stages with uranium-plutonium separation after the first stage, and product concentrators. In this facility area mixed oxide is formed into pellets, the pellets are loaded into fuel rods, and the fuel rods are fabricated into fuel assemblies. These two facility sections are connected by a MOX conversion line in which the uranium and plutonium solutions from reprocessing are converted to mixed oxide. The model of the intermediate MOX conversion line used in the model is based on a design provided by Mike Ehinger of Oak Ridge National Laboratory (private communication). An initial version of the simulation model has been developed for the entire MOX conversion and fuel fabrication sections of the reprocessing/MOX fuel fabrication facility, and this model has been used to obtain inventory difference variance estimates for those sections of the facility. A significant fraction of the data files for the fuel reprocessing section have been developed, but these data files are not yet complete enough to permit simulation of reprocessing operations in the facility. Accordingly, the discussion in the following sections is restricted to the MOX conversion and fuel fabrication lines. 3 tabs

  7. Household trends in access to improved water sources and sanitation facilities in Vietnam and associated factors: findings from the Multiple Indicator Cluster Surveys, 2000-2011.

    Science.gov (United States)

    Tuyet-Hanh, Tran Thi; Lee, Jong-Koo; Oh, Juhwan; Van Minh, Hoang; Ou Lee, Chul; Hoan, Le Thi; Nam, You-Seon; Long, Tran Khanh

    2016-01-01

    Despite progress made by the Millennium Development Goal (MDG) number 7.C, Vietnam still faces challenges with regard to the provision of access to safe drinking water and basic sanitation. This paper describes household trends in access to improved water sources and sanitation facilities separately, and analyses factors associated with access to improved water sources and sanitation facilities in combination. Secondary data from the Vietnam Multiple Indicator Cluster Survey in 2000, 2006, and 2011 were analyzed. Descriptive statistics and tests of significance describe trends over time in access to water and sanitation by location, demographic and socio-economic factors. Binary logistic regressions (2000, 2006, and 2011) describe associations between access to water and sanitation, and geographic, demographic, and socio-economic factors. There have been some outstanding developments in access to improved water sources and sanitation facilities from 2000 to 2011. In 2011, the proportion of households with access to improved water sources and sanitation facilities reached 90% and 77%, respectively, meeting the 2015 MDG targets for safe drinking water and basic sanitation set at 88% and 75%, respectively. However, despite these achievements, in 2011, only 74% of households overall had access to combined improved drinking water and sanitation facilities. There were also stark differences between regions. In 2011, only 47% of households had access to both improved water and sanitation facilities in the Mekong River Delta compared with 94% in the Red River Delta. In 2011, households in urban compared to rural areas were more than twice as likely (odds ratio [OR]: 2.2; 95% confidence interval [CI]: 1.9-2.5) to have access to improved water and sanitation facilities in combination, and households in the highest compared with the lowest wealth quintile were over 40 times more likely (OR: 42.3; 95% CI: 29.8-60.0). More efforts are required to increase household access to

  8. prevalence and correlates of utilization of health facilities in ...

    African Journals Online (AJOL)

    Musumali

    2007-10-11

    Oct 11, 2007 ... of the expectant women did not deliver at a health facility ... health service utilization for childbirth such as education5-8, maternal age 3,6, parity6,8, economic status7, cultural factors and beliefs, lack of skilled staff at primary.

  9. AB Manpower Plan 2007

    CERN Document Server

    Myers, Stephen

    2007-01-01

    The present exercise is not as such a "manpower plan" but a purely budgetary comparison of known plus requested resources with the known commitments over the period 2007-2012. From a purely budgetary point of view, AB will have the capacity to maintain all those recently hired staff who fulfill the criteria for long term employment at CERN. Following this budgetary exercise, AB proposes to perform a CERN-wide staff work plan so as to compare the manpower available to the quantity of work to be done in the totality of the work-packages. If there is a significant mismatch between these two quantities then we propose the following measures which would create personnel economies and allow us to redress the mismatch by increased recruitment: a new job severance scheme; CERN restructuring; use of the new CERN-ITER agreement; more flexibility in transfers from Materials to Personnel budgets. Failing this a re-examination of possible closure of lower priority facilities may be needed.

  10. Continuous Improvement and the Safety Case for the Waste Isolation Pilot Plant Geologic Repository - 13467

    Energy Technology Data Exchange (ETDEWEB)

    Van Luik, Abraham; Patterson, Russell; Nelson, Roger [US Department of Energy, Carlsbad Field Office, 4021 S. National parks Highway, Carlsbad, NM 88220 (United States); Leigh, Christi [Sandia National Laboratories Carlsbad Operations, 4100 S. National parks Highway, Carlsbad, NM 88220 (United States)

    2013-07-01

    The Waste Isolation Pilot Plant (WIPP) is a geologic repository 2150 feet (650 m) below the surface of the Chihuahuan desert near Carlsbad, New Mexico. WIPP permanently disposes of transuranic waste from national defense programs. Every five years, the U.S. Department of Energy (DOE) submits an application to the U.S. Environmental Protection Agency (EPA) to request regulatory-compliance re-certification of the facility for another five years. Every ten years, DOE submits an application to the New Mexico Environment Department (NMED) for the renewal of its hazardous waste disposal permit. The content of the applications made by DOE to the EPA for re-certification, and to the NMED for permit-renewal, reflect any optimization changes made to the facility, with regulatory concurrence if warranted by the nature of the change. DOE points to such changes as evidence for its having taken seriously its 'continuous improvement' operations and management philosophy. Another opportunity for continuous improvement is to look at any delta that may exist between the re-certification and re-permitting cases for system safety and the consensus advice on the nature and content of a safety case as being developed and published by the Nuclear Energy Agency's Integration Group for the Safety Case (IGSC) expert group. DOE at WIPP, with the aid of its Science Advisor and teammate, Sandia National Laboratories, is in the process of discerning what can be done, in a reasonably paced and cost-conscious manner, to continually improve the case for repository safety that is being made to the two primary regulators on a recurring basis. This paper will discuss some aspects of that delta and potential paths forward to addressing them. (authors)

  11. Qualification tests and facilities for the ITER superconductors

    International Nuclear Information System (INIS)

    Bruzzone, P.; Wesche, R.; Stepanov, B.; Cau, F.; Bagnasco, M.; Calvi, M.; Herzog, R.; Vogel, M.

    2009-01-01

    All the ITER superconductors are tested as short length samples in the SULTAN test facility at CRPP. Twenty-four TF conductor samples with small layout variations were tested since February 2007 with the aim of verifying the design and qualification of the manufacturers. The sample assembly and the measurement techniques at CRPP are discussed. Starting in 2010, another test facility for ITER conductors, named EDIPO, will be operating at CRPP to share with SULTAN the load of the samples for the acceptance tests during the construction of ITER.

  12. PERMITTING LEADERSHIP IN THE UNITED STATES

    International Nuclear Information System (INIS)

    Ken Nemeth

    2002-01-01

    In accordance with the Southern States Energy Board (SSEB) proposal, as incorporated into NETL/DE-FC26-97FT34199, the objective of this agreement is to streamline the environmental technology permitting process site-to-site, state-to-state, and industry-to-industry to achieve remediation and waste processing faster, better and cheaper. SSEB is working with member Governors, legislators and regulators to build consensus on streamlining the permitting process for new and innovative technologies for addressing the legacy of environmental problems from 50 years of weapons research, development and production. This report reviews mechanisms whereby industry consortiums and the Department of Energy (DOE) have been working with State regulators and other officials in technology deployment decisions within the DOE complex. The historic development of relationships with State regulators is reviewed and the current nature of the relationships examined. The report contains observations from internal DOE reviews as well as recommendations from the General Accounting Office (GAO) and other external organizations. The report discusses reorganization initiatives leading up to a DOE Top-to-Bottom review of the Environmental Management (EM) Program and highlights points of consideration for maintaining effective linkages with State regulators. It notes how the proposed changes will place new demands upon the National Energy Technology Laboratory (NETL) and how NETL can leverage its resources by refocusing existing EM efforts specifically to states that have DOE facilities within their borders (host-states). Finally, the report discusses how SSEB's Permitting Leadership in the United States (PLUS) program can provide the foundation for elements of NETL's technical assistance program that are delivered to regulators and other decision- makers in host-states. As a regional compact commission, SSEB provides important direct linkages to regulators and stakeholders who need technical

  13. n_TOF facility past and future

    CERN Document Server

    Vlachoudis, V

    2010-01-01

    The neutron Time of Flight (n_TOF) facility at CERN is a source of high flux of neutrons obtained by the spallation process of 20 GeV/c protons onto a solid lead target and the remarkable beam intensity of the Proton Synchrotron (PS). From November 2008 the n_TOF facility resumed operation after a halt of 4 years due to radio-protection issues. It features a new lead spallation target with a more robust design, more efficient cooling, separate moderator circuit, target area ventilation and most important without any loss of the unique neutron performances of the previous target. Moreover the separate moderator circuit will permit in the future the use of borated or heavy water instead of normal water to reduce the 2.2 MeV gamma background for the neutron capture measurements. The facility has been commissioned in Nov 2008, with performances similar of the previous target and predicted by Monte Carlo simulations. The facility will resume operation for physics from May 2009 with 4 experimental proposals already...

  14. Navy Professional Reading Program: Results of the 2007 Survey

    National Research Council Canada - National Science Library

    Uriell, Zannette A; Johnson, J. S

    2008-01-01

    In 2007, the Navy instituted the Navy Professional Reading Program (NPRP), designed to empower Sailors to grow professionally by improving critical thinking and stimulating discussion through professional reading...

  15. APS Science 2007.

    Energy Technology Data Exchange (ETDEWEB)

    2008-05-30

    This report provides research highlights from the Advanced Photon Source (APS). Although these highlights represent less than 10% of the published work from the APS in 2007, they give a flavor of the diversity and impact of user research at the facility. In the strategic planning the aim is to foster the growth of existing user communities and foresee new areas of research. This coming year finds the APS engaged in putting together, along with the users, a blueprint for the next five years, and making the case for a set of prioritized investments in beamlines, the accelerator, and infrastructure, each of which will be transformational in terms of scientific impact. As this is written plans are being formulated for an important user workshop on October 20-21, 2008, to prioritize strategic plans. The fruit from past investments can be seen in this report. Examples include the creation of a dedicated beamline for x-ray photon correlation spectroscopy at Sector 8, the evolution of dedicated high-energy x-ray scattering beamlines at sectors 1 and 11, a dedicated imaging beamline at Sector 32, and new beamlines for inelastic scattering and powder diffraction. A single-pulse facility has been built in collaboration with Sector 14 (BioCARS) and Phil Anfinrud at the National Institutes of Health, which will offer exceptionally high flux for single-pulse diffraction. The nanoprobe at Sector 26, built and operated jointly by the Argonne Center for Nanoscale Materials and the X-ray Operations and Research (XOR) section of the APS X-ray Science Division, has come on line to define the state of the art in nanoscience.

  16. APS Science 2007

    International Nuclear Information System (INIS)

    2008-01-01

    This report provides research highlights from the Advanced Photon Source (APS). Although these highlights represent less than 10% of the published work from the APS in 2007, they give a flavor of the diversity and impact of user research at the facility. In the strategic planning the aim is to foster the growth of existing user communities and foresee new areas of research. This coming year finds the APS engaged in putting together, along with the users, a blueprint for the next five years, and making the case for a set of prioritized investments in beamlines, the accelerator, and infrastructure, each of which will be transformational in terms of scientific impact. As this is written plans are being formulated for an important user workshop on October 20-21, 2008, to prioritize strategic plans. The fruit from past investments can be seen in this report. Examples include the creation of a dedicated beamline for x-ray photon correlation spectroscopy at Sector 8, the evolution of dedicated high-energy x-ray scattering beamlines at sectors 1 and 11, a dedicated imaging beamline at Sector 32, and new beamlines for inelastic scattering and powder diffraction. A single-pulse facility has been built in collaboration with Sector 14 (BioCARS) and Phil Anfinrud at the National Institutes of Health, which will offer exceptionally high flux for single-pulse diffraction. The nanoprobe at Sector 26, built and operated jointly by the Argonne Center for Nanoscale Materials and the X-ray Operations and Research (XOR) section of the APS X-ray Science Division, has come on line to define the state of the art in nanoscience

  17. The French accelerator mass spectrometry facility ASTER: Improved performance and developments

    Energy Technology Data Exchange (ETDEWEB)

    Arnold, Maurice [CEREGE, CNRS-IRD-Universite Aix-Marseille, F-13545 Aix-en-Provence (France); Merchel, Silke, E-mail: s.merchel@fzd.d [CEREGE, CNRS-IRD-Universite Aix-Marseille, F-13545 Aix-en-Provence (France); Forschungszentrum Dresden-Rossendorf, D-01314 Dresden (Germany); Bourles, Didier L.; Braucher, Regis; Benedetti, Lucilla [CEREGE, CNRS-IRD-Universite Aix-Marseille, F-13545 Aix-en-Provence (France); Finkel, Robert C. [CEREGE, CNRS-IRD-Universite Aix-Marseille, F-13545 Aix-en-Provence (France); Earth and Planetary Science Department, UC Berkeley, Berkeley, CA 94720-4767 (United States); Aumaitre, Georges [CEREGE, CNRS-IRD-Universite Aix-Marseille, F-13545 Aix-en-Provence (France); Gottdang, Andreas; Klein, Matthias [High Voltage Engineering Europa B.V., NL-3800 AB Amersfoort (Netherlands)

    2010-06-15

    Following the installation and acceptance test of the French 5 MV AMS facility ASTER, the focus has been on improving the capability for routine measurements of {sup 10}Be and {sup 26}Al. Quality assurance has been established by the introduction of traceable AMS standards for each nuclide, by self-monitoring through participation in round-robin exercises and proficiency testing, and by surveillance of long- and short-time variability of blank and reference materials. A background level of 3 x 10{sup -14} makes ASTER well-suited for measuring {sup 41}Ca/{sup 40}Ca in the10{sup -12} region, which is sufficient for a wide range of applications. Routine AMS measurements of volatile elements like {sup 36}Cl and {sup 129}I will most likely become feasible in the very near future as the result of significant improvements in the ion source design.

  18. Conceptual design for the Waste Receiving and Processing facility Module 2A

    International Nuclear Information System (INIS)

    1992-07-01

    This is a Conceptual Design Report (CDR) for the Waste Receiving and Processing (WRAP) Module 2A facility at Hanford Reservation. The mission of the WRAP Module 2A facility is to receive, process, package, certify, and ship for permanent burial at the Hanford site disposal facilities those contact handled (CH) low-level radioactive mixed wastes (LLMW) that: (1) are currently in retrievable storage at the Hanford Central Waste Complex (HCWC) awaiting a treatment capability to permit permanent disposal compliant with the Land Disposal Restrictions and; (2) are forecasted to be generated over the next 30 years. The primary sources of waste to be treated at WRAP Module 2A include the currently stored waste from the 183-H solar basin evaporators, secondary solids from the future Hanford site liquid effluent treatment facilities, thermal treatment facility ash, other WRAP modules, and other, miscellaneous waste from storage and onsite/offsite waste generators consisting of compactible and non-compactible solids, contaminated soils, and metals. This volume, Volume 1 provides a narrative of the project background, objective and justification. A description of the WRAP 2A mission, operations and project scope is also included. Significant project requirements such as security, health, safety, decontamination and decomissioning, maintenance, data processing, and quality are outlined. Environmental compliance issues and regulatory permits are identified, and a preliminary safety evaluation is provided

  19. Resource Conservation and Recovery Act, Part B permit application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 1, Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-01

    This volume includes the following chapters: Waste Isolation Pilot Plant RCRA A permit application; facility description; waste analysis plan; groundwater monitoring; procedures to prevent hazards; RCRA contingency plan; personnel training; corrective action for solid waste management units; and other Federal laws.

  20. The LPCTrap facility for in-trap decay experiments

    International Nuclear Information System (INIS)

    Rodriguez, D.; Ban, G.; Durand, D.; Duval, F.; Flechard, X.; Herbane, M.; Lienard, E.; Mauger, F.; Mery, A.; Naviliat-Cuncic, O.; Thomas, J.-C.

    2007-01-01

    The LPCTrap facility is coupled to the low-energy beam line LIRAT of the SPIRAL source at GANIL (France). The facility comprises an RFQ trap for beam preparation and a transparent Paul trap for in-trap decay studies. The system has been tested for several ion species. The Paul trap has been fully characterized for 6 Li + and 23 Na + ions. This characterization together with GEANT4 simulations of the in-trap decay setup (Paul trap and detection system) has permitted to predict the effect of the size of the ion cloud on the decay study of 6 He + .

  1. CIF---Design basis for an integrated incineration facility

    International Nuclear Information System (INIS)

    Bennett, G.F.

    1991-01-01

    This paper discusses the evolution of chosen technologies that occurred during the design process of the US Department of Energy (DOE) incineration system designated the Consolidated Incineration Facility (CIF) as the Savannah River Plant, Aiken, South Carolina. The Plant is operated for DOE by the Westinghouse Savannah River Company. The purpose of the incineration system is to treat low level radioactive and/or hazardous liquid and solid wastes by combustion. The objective for the facility is to thermally destroy toxic constituents and volume reduce waste material. Design criteria requires operation be controlled within the limits of RCRA's permit envelope

  2. Patient characteristics and service trends following abortion legalization in Mexico City, 2007-10.

    Science.gov (United States)

    Mondragón y Kalb, Manuel; Ahued Ortega, Armando; Morales Velazquez, Jorge; Díaz Olavarrieta, Claudia; Valencia Rodríguez, Jorge; Becker, Davida; García, Sandra G

    2011-09-01

    Legal abortion services have been available in public and private health facilities in Mexico City since April 2007 for pregnancies of up to 12 weeks gestation. As of January 2011, more than 50,000 procedures have been performed by Ministry of Health hospitals and clinics. We researched trends in service users' characteristics, types of procedures performed, post-procedure complications, repeat abortions, and postabortion uptake of contraception in 15 designated hospitals from April 2007 to March 2010. The trend in procedures has been toward more medication and manual vacuum aspiration abortions and fewer done through dilation and curettage. Percentages of post-procedure complications and repeat abortions remain low (2.3 and 0.9 percent, respectively). Uptake of postabortion contraception has increased over time; 85 percent of women selected a method in 2009-10, compared with 73 percent in 2007-08. Our findings indicate that the Ministry of Health's program provides safe services that contribute to the prevention of repeat unintended pregnancies.

  3. The IAEA research project on improvement of safety assessment methodologies for near surface disposal facilities

    International Nuclear Information System (INIS)

    Torres-Vidal, C.; Graham, D.; Batandjieva, B.

    2002-01-01

    The International Atomic Energy Agency (IAEA) Research Coordinated Project on Improvement of Safety Assessment Methodologies for Near Surface Disposal Facilities (ISAM) was launched in November 1997 and it has been underway for three years. The ISAM project was developed to provide a critical evaluation of the approaches and tools used in long-term safety assessment of near surface repositories. It resulted in the development of a harmonised approach and illustrated its application by way of three test cases - vault, borehole and Radon (a particular range of repository designs developed within the former Soviet Union) type repositories. As a consequence, the ISAM project had over 70 active participants and attracted considerable interest involving around 700 experts from 72 Member States. The methodology developed, the test cases, the main lessons learnt and the conclusions have been documented and will be published in the form of an IAEA TECDOC. This paper presents the work of the IAEA on improvement of safety assessment methodologies for near surface waste disposal facilities and the application of these methodologies for different purposes in the individual stages of the repository development. The paper introduces the main objectives, activities and outcome of the ISAM project and summarizes the work performed by the six working groups within the ISAM programme, i.e. Scenario Generation and Justification, Modelling, Confidence Building, Vault, Radon Type Facility and Borehole test cases. (author)

  4. Technical Cooperation Report for 2007. Report by the Director General

    International Nuclear Information System (INIS)

    2008-07-01

    Part A of this document provides an overview of technical cooperation activities from 1 April 2007 to 31 March 2008. In 2007 the programme delivered support to 122 countries and territories; 3546 expert and lecturer assignments were carried out, 4149 participants attended meetings, 2287 people took part in training courses and 1661 benefited from fellowships and scientific visits. 2007 saw a range of activities to enhance the effectiveness of the Technical Cooperation (TC) programme. Standardized quality criteria were introduced for project screening and design, and additional enhancements were made to the Programme Cycle Management Framework (PCMF) IT application. Factors affecting project delivery, including Member State support required for timely implementation, have been monitored and assessed as a basis for further improvements. Strengthening Member State capacities is a key technical cooperation objective, and a range of actions were carried out in 2007 with this goal in mind. Technical cooperation among developing countries continued throughout 2007, building on the expanding knowledge and capacities of Member States to enhance self-reliance and sustainability. Knowledge management, an essential component in building sustainable capacities at all levels, was also addressed. In Europe, a regional project to establish policies and strategies to preserve nuclear knowledge is supporting the development of common approaches to knowledge management in nuclear technology, while IAEA support to the World Nuclear University enabled 21 participants from developing countries to attend courses at the WNU Summer Institute in the Republic of Korea. In 2007, the Agency reached out to partners ranging from UN organizations to development banks and from regional groups to theme-based institutions. In the Latin America region, cooperation between the IAEA and UNEP's Caribbean Regional Co-ordinating Unit (CAR/RCU) was formalized, focusing on the promotion of integrated

  5. Technical Cooperation Report for 2007. Report by the Director General

    International Nuclear Information System (INIS)

    2008-08-01

    Part A of this document provides an overview of technical cooperation activities from 1 April 2007 to 31 March 2008. In 2007 the programme delivered support to 122 countries and territories; 3546 expert and lecturer assignments were carried out, 4149 participants attended meetings, 2287 people took part in training courses and 1661 benefited from fellowships and scientific visits. 2007 saw a range of activities to enhance the effectiveness of the Technical Cooperation (TC) programme. Standardized quality criteria were introduced for project screening and design, and additional enhancements were made to the Programme Cycle Management Framework (PCMF) IT application. Factors affecting project delivery, including Member State support required for timely implementation, have been monitored and assessed as a basis for further improvements. Strengthening Member State capacities is a key technical cooperation objective, and a range of actions were carried out in 2007 with this goal in mind. Technical cooperation among developing countries continued throughout 2007, building on the expanding knowledge and capacities of Member States to enhance self-reliance and sustainability. Knowledge management, an essential component in building sustainable capacities at all levels, was also addressed. In Europe, a regional project to establish policies and strategies to preserve nuclear knowledge is supporting the development of common approaches to knowledge management in nuclear technology, while IAEA support to the World Nuclear University enabled 21 participants from developing countries to attend courses at the WNU Summer Institute in the Republic of Korea. In 2007, the Agency reached out to partners ranging from UN organizations to development banks and from regional groups to theme-based institutions. In the Latin America region, cooperation between the IAEA and UNEP's Caribbean Regional Co-ordinating Unit (CAR/RCU) was formalized, focusing on the promotion of integrated

  6. Technical Cooperation Report for 2007. Report by the Director General

    International Nuclear Information System (INIS)

    2008-08-01

    Part A of this document provides an overview of technical cooperation activities from 1 April 2007 to 31 March 2008. In 2007 the programme delivered support to 122 countries and territories; 3546 expert and lecturer assignments were carried out, 4149 participants attended meetings, 2287 people took part in training courses and 1661 benefited from fellowships and scientific visits. 2007 saw a range of activities to enhance the effectiveness of the Technical Cooperation (TC) programme. Standardized quality criteria were introduced for project screening and design, and additional enhancements were made to the Programme Cycle Management Framework (PCMF) IT application. Factors affecting project delivery, including Member State support required for timely implementation, have been monitored and assessed as a basis for further improvements. Strengthening Member State capacities is a key technical cooperation objective, and a range of actions were carried out in 2007 with this goal in mind. Technical cooperation among developing countries continued throughout 2007, building on the expanding knowledge and capacities of Member States to enhance self-reliance and sustainability. Knowledge management, an essential component in building sustainable capacities at all levels, was also addressed. In Europe, a regional project to establish policies and strategies to preserve nuclear knowledge is supporting the development of common approaches to knowledge management in nuclear technology, while IAEA support to the World Nuclear University enabled 21 participants from developing countries to attend courses at the WNU Summer Institute in the Republic of Korea. In 2007, the Agency reached out to partners ranging from UN organizations to development banks and from regional groups to theme-based institutions. In the Latin America region, cooperation between the IAEA and UNEP's Caribbean Regional Co-ordinating Unit (CAR/RCU) was formalized, focusing on the promotion of integrated

  7. Technical Cooperation Report for 2007. Report by the Director General

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-07-15

    Part A of this document provides an overview of technical cooperation activities from 1 April 2007 to 31 March 2008. In 2007 the programme delivered support to 122 countries and territories; 3546 expert and lecturer assignments were carried out, 4149 participants attended meetings, 2287 people took part in training courses and 1661 benefited from fellowships and scientific visits. 2007 saw a range of activities to enhance the effectiveness of the Technical Cooperation (TC) programme. Standardized quality criteria were introduced for project screening and design, and additional enhancements were made to the Programme Cycle Management Framework (PCMF) IT application. Factors affecting project delivery, including Member State support required for timely implementation, have been monitored and assessed as a basis for further improvements. Strengthening Member State capacities is a key technical cooperation objective, and a range of actions were carried out in 2007 with this goal in mind. Technical cooperation among developing countries continued throughout 2007, building on the expanding knowledge and capacities of Member States to enhance self-reliance and sustainability. Knowledge management, an essential component in building sustainable capacities at all levels, was also addressed. In Europe, a regional project to establish policies and strategies to preserve nuclear knowledge is supporting the development of common approaches to knowledge management in nuclear technology, while IAEA support to the World Nuclear University enabled 21 participants from developing countries to attend courses at the WNU Summer Institute in the Republic of Korea. In 2007, the Agency reached out to partners ranging from UN organizations to development banks and from regional groups to theme-based institutions. In the Latin America region, cooperation between the IAEA and UNEP's Caribbean Regional Co-ordinating Unit (CAR/RCU) was formalized, focusing on the promotion of integrated

  8. Technical Cooperation Report for 2007. Report by the Director General

    International Nuclear Information System (INIS)

    2008-08-01

    Part A of this document provides an overview of technical cooperation activities from 1 April 2007 to 31 March 2008. In 2007 the programme delivered support to 122 countries and territories; 3546 expert and lecturer assignments were carried out, 4149 participants attended meetings, 2287 people took part in training courses and 1661 benefited from fellowships and scientific visits. 2007 saw a range of activities to enhance the effectiveness of the Technical Cooperation (TC) programme. Standardized quality criteria were introduced for project screening and design, and additional enhancements were made to the Programme Cycle Management Framework (PCMF) IT application. Factors affecting project delivery, including Member State support required for timely implementation, have been monitored and assessed as a basis for further improvements. Strengthening Member State capacities is a key technical cooperation objective, and a range of actions were carried out in 2007 with this goal in mind. Technical cooperation among developing countries continued throughout 2007, building on the expanding knowledge and capacities of Member States to enhance self-reliance and sustainability. Knowledge management, an essential component in building sustainable capacities at all levels, was also addressed. In Europe, a regional project to establish policies and strategies to preserve nuclear knowledge is supporting the development of common approaches to knowledge management in nuclear technology, while IAEA support to the World Nuclear University enabled 21 participants from developing countries to attend courses at the WNU Summer Institute in the Republic of Korea. In 2007, the Agency reached out to partners ranging from UN organizations to development banks and from regional groups to theme-based institutions. In the Latin America region, cooperation between the IAEA and UNEP's Caribbean Regional Co-ordinating Unit (CAR/RCU) was formalized, focusing on the promotion of integrated

  9. Improvements at the biological shielding of BNCT research facility in the IEA-R1 reactor

    International Nuclear Information System (INIS)

    Souza, Gregorio Soares de

    2011-01-01

    The technique of neutron capture in boron is a promising technique in cancer treatment, it uses the high LET particles from the reaction 10 B (n, α) 7 Li to destroy cancer cells.The development of this technique began in the mid-'50s and even today it is the object of study and research in various centers around the world, Brazil has built a facility that aims to conduct research in BNCT, this facility is located next to irradiation channel number three at the research nuclear reactor IEA-R1 and has a biological shielding designed to meet the radiation protection standards. This biological shielding was developed to allow them to conduct experiments with the reactor at maximum power, so it is not necessary to turn on and off the reactor to irradiate samples. However, when the channel is opened for experiments the background radiation in the experiments salon increases and this background variation makes it impossible to perform measurements in a neutron diffraction research that utilizes the irradiation channel number six. This study aims to further improve the shielding in order to minimize the variation of background making it possible to perform the research facility in BNCT without interfering with the action of the research group of the irradiation channel number six. To reach this purpose, the code MCNP5, dosimeters and activation detectors were used to plan improvements in the biological shielding. It was calculated with the help of the code an improvement that can reduce the average heat flow in 71.2% ± 13 and verified experimentally a mean reduce of 70 ± 9% in dose due to thermal neutrons. (author)

  10. Deactivating a major nuclear fuels reprocessing facility

    International Nuclear Information System (INIS)

    LeBaron, G.J.

    1997-01-01

    This paper describes three key processes used in deactivating the Plutonium Uranium Extraction (PUREX) Facility, a large, complex nuclear reprocessing facility, 15 months ahead of schedule and $77 million under budget. The organization was reengineered to refine its business processes and more effectively organize around the deactivation work scope. Multi-disciplined work teams were formed to be self-sufficient and empowered to make decisions and perform work. A number of benefits were realized by reengineering. A comprehensive process to develop end points which clearly identified specific results and the post-project facility configuration was developed so all areas of a facility were addressed. Clear and specific end points allowed teams to focus on completing deactivation activities and helped ensure there were no unfulfilled end-of-project expectations. The RCRA regulations require closure of permitted facilities within 180 days after cessation of operations which may essentially necessitate decommissioning. A more cost effective approach was adopted which significantly reduced risk to human health and the environment by taking the facility to a passive, safe, inexpensive-to-maintain surveillance and maintenance condition (deactivation) prior to disposition. PUREX thus became the first large reprocessing facility with active TSD [treatment, storage, and disposal] units to be deactivated under the RCRA regulations

  11. Facilities for the treatment of radioactively contaminated water in nuclear power plants

    International Nuclear Information System (INIS)

    1978-01-01

    The regulation is to be applied to design, construction and operation of facilities for the treatment of contaminated water in stationary nuclear power plants with LWR and HTR. The facilities are to be designed, constructed and operated in such manner that (a) imcontrolled discharge of contaminated water is avoided (Paragraph 46 section 1, no. 1 Radiation Protection Regulation) (b) the activity discharged with water is as low as possible ( paragraph 46, section 2, no. 2 Radiation Protection Regulation) (c)contaminated water will not get into the ground, unless this is permitted by a license (paragraph 46 section 6 Radiation Protection Regulation) (d) the radiation exposure resulting from direct radiation, contamination and inhalation of the personnel working with the facility is as low as possible and, at the most, corresponds to the values fixed in the regulation (paragraph 28 section 1 Radiation Protection Regulation) or the values given in the discharge permit. The regulation is not to be applied to installations for reactor coolant or fuel pit clean-up. (orig./HP) [de

  12. F-Area Hazardous Waste Management Facility Semiannual Corrective Action Report, First and Second Quarter 1998, Volume I and II

    International Nuclear Information System (INIS)

    Chase, J.

    1998-01-01

    This report addresses groundwater quality and monitoring data during first and second quarter 1998 for the F-Area Hazardous Waste management Facility (HWMF). The report fulfills the semiannual reporting requirements of Module III, Section D, of the 1995 Resource Conservation and Recovery Act (RCRA) Renewal Permit (South Carolina Hazardous and Mixed Waste Permit SC1-890-008-989), effective October 5, 1995 (hereafter referred to as the RCRA permit), and Section C of the Underground Injection Control Permit Application hereafter referred to as the Section C of the Underground Injection Control Permit Application (hereafter referred to as the UIC permit). The HWMF is described in the Introduction to Module III, Section C, of the RCRA permit

  13. Discharge documentation of patients discharged to subacute facilities: a three-year quality improvement process across an integrated health care system.

    Science.gov (United States)

    Gandara, Esteban; Ungar, Jonathan; Lee, Jason; Chan-Macrae, Myrna; O'Malley, Terrence; Schnipper, Jeffrey L

    2010-06-01

    Effective communication among physicians during hospital discharge is critical to patient care. Partners Healthcare (Boston) has been engaged in a multi-year process to measure and improve the quality of documentation of all patients discharged from its five acute care hospitals to subacute facilities. Partners first engaged stakeholders to develop a consensus set of 12 required data elements for all discharges to subacute facilities. A measurement process was established and later refined. Quality improvement interventions were then initiated to address measured deficiencies and included education of physicians and nurses, improvements in information technology, creation of or improvements in discharge documentation templates, training of hospitalists to serve as role models, feedback to physicians and their service chiefs regarding reviewed cases, and case manager review of documentation before discharge. To measure improvement in quality as a result of these efforts, rates of simultaneous inclusion of all 12 applicable data elements ("defect-free rate") were analyzed over time. Some 3,101 discharge documentation packets of patients discharged to subacute facilities from January 1, 2006, through September 2008 were retrospectively studied. During the 11 monitored quarters, the defect-free rate increased from 65% to 96% (p improvements were seen in documentation of preadmission medication lists, allergies, follow-up, and warfarin information. Institution of rigorous measurement, feedback, and multidisciplinary, multimodal quality improvement processes improved the inclusion of data elements in discharge documentation required for safe hospital discharge across a large integrated health care system.

  14. Environmental information document defense waste processing facility

    International Nuclear Information System (INIS)

    1981-07-01

    This report documents the impact analysis of a proposed Defense Waste Processing Facility (DWPF) for immobilizing high-level waste currently being stored on an interim basis at the Savannah River Plant (SRP). The DWPF will process the waste into a form suitable for shipment to and disposal in a federal repository. The DWPF will convert the high-level waste into: a leach-resistant form containing above 99.9% of all the radioactivity, and a residue of slightly contaminated salt. The document describes the SRP site and environs, including population, land and water uses; surface and subsurface soils and waters; meteorology; and ecology. A conceptual integrated facility for concurrently producing glass waste and saltcrete is described, and the environmental effects of constructing and operating the facility are presented. Alternative sites and waste disposal options are addressed. Also environmental consultations and permits are discussed

  15. Improved liquid-lithium target for the FMIT facility

    International Nuclear Information System (INIS)

    Miles, R.R.; Greenwell, R.K.; Hassberger, J.A.; Ingham, J.G.

    1982-11-01

    An improved target for the Fusion Materials Irradiation Testing Facility was designed. The purpose of the target is to produce a high neutron flux (10 19 n/m 2 sec) for testing of candidate first wall materials for fusion reactors. The neutrons are produced through a Li(d,n) stripping reaction between accelerated deuterons (35 MeV, 0.1A) and a thin jet of flowing liquid lithium. The target consists of a high speed (approx. 17 m/s), free surface wall jet which is exposed to the high (10 -4 Pa) accelerator vacuum. The energy deposited by the deuteron beam in the lithium is sufficient to heat the jet internally to a maximum temperature of roughly 740 0 C, 430 0 C greater than the saturation temperature at the jet free surface. For this reason, the jet flows along a curved wall which provides the pressurization required to prevent sperheat internal to the jet. Supporting hardware for the jet and a drain line which controls the jet beyond the beam intercept region

  16. 76 FR 45792 - Proposed Reissuance of a General NPDES Permit for Facilities Related to Oil and Gas Extraction

    Science.gov (United States)

    2011-08-01

    ... proposed rule'' for which the agency ``is required by section 553 of the Administrative Procedure Act (APA... permits, not rulemakings, under the APA and thus not subject to APA rulemaking requirements or the RFA...

  17. Household trends in access to improved water sources and sanitation facilities in Vietnam and associated factors: findings from the Multiple Indicator Cluster Surveys, 2000–2011

    Science.gov (United States)

    Tuyet-Hanh, Tran Thi; Lee, Jong-Koo; Oh, Juhwan; Van Minh, Hoang; Ou Lee, Chul; Hoan, Le Thi; Nam, You-Seon; Long, Tran Khanh

    2016-01-01

    Background Despite progress made by the Millennium Development Goal (MDG) number 7.C, Vietnam still faces challenges with regard to the provision of access to safe drinking water and basic sanitation. Objective This paper describes household trends in access to improved water sources and sanitation facilities separately, and analyses factors associated with access to improved water sources and sanitation facilities in combination. Design Secondary data from the Vietnam Multiple Indicator Cluster Survey in 2000, 2006, and 2011 were analyzed. Descriptive statistics and tests of significance describe trends over time in access to water and sanitation by location, demographic and socio-economic factors. Binary logistic regressions (2000, 2006, and 2011) describe associations between access to water and sanitation, and geographic, demographic, and socio-economic factors. Results There have been some outstanding developments in access to improved water sources and sanitation facilities from 2000 to 2011. In 2011, the proportion of households with access to improved water sources and sanitation facilities reached 90% and 77%, respectively, meeting the 2015 MDG targets for safe drinking water and basic sanitation set at 88% and 75%, respectively. However, despite these achievements, in 2011, only 74% of households overall had access to combined improved drinking water and sanitation facilities. There were also stark differences between regions. In 2011, only 47% of households had access to both improved water and sanitation facilities in the Mekong River Delta compared with 94% in the Red River Delta. In 2011, households in urban compared to rural areas were more than twice as likely (odds ratio [OR]: 2.2; 95% confidence interval [CI]: 1.9–2.5) to have access to improved water and sanitation facilities in combination, and households in the highest compared with the lowest wealth quintile were over 40 times more likely (OR: 42.3; 95% CI: 29.8–60.0). Conclusions More

  18. Household trends in access to improved water sources and sanitation facilities in Vietnam and associated factors: findings from the Multiple Indicator Cluster Surveys, 2000–2011

    Directory of Open Access Journals (Sweden)

    Tran Thi Tuyet-Hanh

    2016-02-01

    Full Text Available Background: Despite progress made by the Millennium Development Goal (MDG number 7.C, Vietnam still faces challenges with regard to the provision of access to safe drinking water and basic sanitation. Objective: This paper describes household trends in access to improved water sources and sanitation facilities separately, and analyses factors associated with access to improved water sources and sanitation facilities in combination. Design: Secondary data from the Vietnam Multiple Indicator Cluster Survey in 2000, 2006, and 2011 were analyzed. Descriptive statistics and tests of significance describe trends over time in access to water and sanitation by location, demographic and socio-economic factors. Binary logistic regressions (2000, 2006, and 2011 describe associations between access to water and sanitation, and geographic, demographic, and socio-economic factors. Results: There have been some outstanding developments in access to improved water sources and sanitation facilities from 2000 to 2011. In 2011, the proportion of households with access to improved water sources and sanitation facilities reached 90% and 77%, respectively, meeting the 2015 MDG targets for safe drinking water and basic sanitation set at 88% and 75%, respectively. However, despite these achievements, in 2011, only 74% of households overall had access to combined improved drinking water and sanitation facilities. There were also stark differences between regions. In 2011, only 47% of households had access to both improved water and sanitation facilities in the Mekong River Delta compared with 94% in the Red River Delta. In 2011, households in urban compared to rural areas were more than twice as likely (odds ratio [OR]: 2.2; 95% confidence interval [CI]: 1.9–2.5 to have access to improved water and sanitation facilities in combination, and households in the highest compared with the lowest wealth quintile were over 40 times more likely (OR: 42.3; 95% CI: 29.8–60

  19. Research and experience report 2007. Developments in the technical and legal basis of nuclear oversight; Erfahrungs- und Forschungsbericht 2007. Entwicklungen im Bereich der Grundlagen der nuklearen Aufsicht

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-07-01

    This annual report issued by the Swiss Federal Nuclear Inspectorate (HSK) reviews the aims, duties and responsibilities of the inspectorate and the work done during 2007. In the area of reactor safety, the research covered materials and the deterministic and probabilistic analysis of incidents and their consequences. In the area of radiation protection, the protection of persons and the environment in the vicinity of nuclear facilities from ionising radiation is addressed. In this area, accurate metrology and research to improve dosimetry and radiation analysis is discussed. In the area of transport and waste management, the HSK is focussing its efforts on research into the geological strata suitable for the final storage of highly radioactive, long-lived waste. Human factors, organisation and safety culture are quoted as playing a major role in nuclear safety. According to the report, greater attention is being given to these factors by those bodies responsible for nuclear regulation. Appendices present an overview of work done, international activities and publications along with the ENSI's guidelines.

  20. Research and experience report 2007. Developments in the technical and legal basis of nuclear oversight; Erfahrungs- und Forschungsbericht 2007. Entwicklungen im Bereich der Grundlagen der nuklearen Aufsicht

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-07-01

    This annual report issued by the Swiss Federal Nuclear Inspectorate (HSK) reviews the aims, duties and responsibilities of the inspectorate and the work done during 2007. In the area of reactor safety, the research covered materials and the deterministic and probabilistic analysis of incidents and their consequences. In the area of radiation protection, the protection of persons and the environment in the vicinity of nuclear facilities from ionising radiation is addressed. In this area, accurate metrology and research to improve dosimetry and radiation analysis is discussed. In the area of transport and waste management, the HSK is focussing its efforts on research into the geological strata suitable for the final storage of highly radioactive, long-lived waste. Human factors, organisation and safety culture are quoted as playing a major role in nuclear safety. According to the report, greater attention is being given to these factors by those bodies responsible for nuclear regulation. Appendices present an overview of work done, international activities and publications along with the ENSI's guidelines.