WorldWideScience

Sample records for ewis maintenance program

  1. 14 CFR 25.1703 - Function and installation: EWIS.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Function and installation: EWIS. 25.1703... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Electrical Wiring Interconnection Systems (EWIS) § 25.1703 Function and installation: EWIS. (a) Each EWIS component installed in any area of the...

  2. Glioblastoma Inhibition by Cell Surface Immunoglobulin Protein EWI-2, In Vitro and In Vivo

    Directory of Open Access Journals (Sweden)

    Tatiana V. Kolesnikova

    2009-01-01

    Full Text Available EWI-2, a cell surface IgSF protein, is highly expressed in normal human brain but is considerably diminished in glioblastoma tumors and cell lines. Moreover, loss of EWI-2 expression correlated with a shorter survival time in human glioma patients, suggesting that EWI-2 might be a natural inhibitor of glioblastoma. In support of this idea, EWI-2 expression significantly impaired both ectopic and orthotopic tumor growth in nude mice in vivo. In vitro assays provided clues regarding EWI-2 functions. Expression of EWI-2 in T98G and/or U87-MG malignant glioblastoma cell lines failed to alter two-dimensional cell proliferation but inhibited glioblastoma colony formation in soft agar and caused diminished cell motility and invasion. At the biochemical level, EWI-2 markedly affects the organization of four molecules (tetraspanin proteins CD9 and CD81 and matrix metalloproteinases MMP-2 and MT1-MMP, which play key roles in the biology of astrocytes and gliomas. EWI-2 causes CD9 and CD81 to become more associated with each other, whereas CD81 and other tetraspanins become less associated with MMP-2 and MT1-MMP. We propose that EWI-2 inhibition of glioblastoma growth in vivo is at least partly explained by the capability of EWI-2 to inhibit growth and/or invasion in vitro. Underlying these functional effects, EWI-2 causes a substantial molecular reorganization of multiple molecules (CD81, CD9, MMP-2, and MT1-MMP known to affect proliferation and/or invasion of astrocytes and/or glioblastomas.

  3. Differential expression of EWI-2 in endometriosis, its functional role and underlying molecular mechanisms.

    Science.gov (United States)

    Zheng, Tingting; Yang, Jing

    2017-07-01

    We aimed to investigate EWI-2 expression in endometrium tissues collected from women with endometriosis at mRNA and protein levels, to evaluate its potential as a biomarker for endometriosis and to study its functional role via possible regulation of the PI3K/Akt signaling pathway. Endometrium tissues were collected from patients with endometriosis and healthy individuals. EWI-2 mRNA expression was evaluated using quantitative real-time PCR (qRT-PCR) while EWI-2 protein levels were determined by western blotting. For functional studies, EWI-2 shRNA was transfected in endometrial epithelial cells and the in vitro migration and invasion assays were performed using the Transwell chambers. EWI-2 was significantly downregulated in tissues obtained from patients with endometriosis compared with healthy individuals (P endometriosis diagnosis was 0.8942 (P = 0.003), 0.9643 (P = 0.0001), 0.9912 (P endometriosis in matched comparisons of data originated from the proliferative, early, middle, and late secretory phases. Over the menstrual cycle, the expression of EWI-2 was significantly decreased in the eutopic tissues compared to the ectopic tissues. Further cellular and molecular analyses showed that EWI-2 inhibited cell migration and invasion via the Akt signaling. Our findings suggested that downregulation of EWI-2 may contribute to endometriosis physiopathology and potentiate EWI-2 as a valuable diagnostic biomarker and therapeutic target for endometriosis. © 2017 Japan Society of Obstetrics and Gynecology.

  4. Isolated EWiRaC: A New Low-Stress Single-Stage Isolated PFC Converter

    DEFF Research Database (Denmark)

    Schneider, Henrik; Bergendorff, Stefan Pihl; Petersen, Lars

    2007-01-01

    A new PFC-family of Efficient Wide Range Converters named EWiRaC was recently introduced. EWiRaC has a major advantage in terms of efficiency at low-line and handles challenges like inrush current limiting as an integrated part of the conversion scheme. The main objective of this paper is to inve......A new PFC-family of Efficient Wide Range Converters named EWiRaC was recently introduced. EWiRaC has a major advantage in terms of efficiency at low-line and handles challenges like inrush current limiting as an integrated part of the conversion scheme. The main objective of this paper...

  5. External Wall Insulation (EWI: Engaging Social Tenants in Energy Efficiency Retrofitting in the North East of England

    Directory of Open Access Journals (Sweden)

    Sara Lilley

    2017-11-01

    Full Text Available The question of how best to tackle the problem of energy inefficient older housing in the UK is considerable, and is further complicated by the question of tenure. Social landlords are working to update and improve their properties, which make up around 15% of the total UK housing stock (4 million properties. The success of such efficiency improvements depends in part on the cooperation of tenants, and their ability and willingness to engage with the process of change. This paper describes the experiences of eleven social housing tenant households whose properties were fitted with External Wall Insulation (EWI, based on pre- and post-installation interviews and data collection. It includes discussion of tenants’ knowledge, attitudes, and expectations prior to and following installation; household thermal comfort and energy spending before installation; tenant experiences of having EWI installed; tenant perceptions regarding the effects of EWI on thermal comfort, energy spending, and housing attractiveness; impacts of EWI on internal temperatures and heat loss (measured via thermal imaging; energy bill comparisons. Households experienced an average saving of 33% on energy bills following EWI installation, and the majority of tenants reported benefits including improved thermal comfort and related positive impacts on health and wellbeing. The paper concludes by highlighting potential learning points for engaging tenants in the process of enhancing energy efficiency in UK social rented housing.

  6. Efficient Wide Range Converters (EWiRaC): A new family of high efficient AC-DC Converters

    DEFF Research Database (Denmark)

    Petersen, Lars; Andersen, Michael Andreas E.

    2006-01-01

    The performance in terms of efficiency of the existing power supplies used for PFC is very dependent on the input voltage range. The boost converter is the most commonly used PFC converter because of its simplicity and high efficiency. But, the boost converter as well as other known converters...... suffers a major penalty in efficiency when used at the low end of the voltage range (90VAC) in a universal voltage range application (90-270VAC). This paper addresses this problem by suggesting a new family of converters that effectively reduces the apparent voltage range with a factor of 2 by changing...... the converter topology according to the input voltage. This new converter type has been named: efficient wide range converter (EWiRaC). The performance of the EWiRaC is experimental verified in a universal input range (90-270VAC) application with an output voltage of 185VDC capable of 500W output power. The EWi...

  7. JRR-3 maintenance program utilizing accumulated maintenance data

    International Nuclear Information System (INIS)

    Izumo, Hironobu; Kato, Tomoaki; Kinase, Masami; Torii, Yoshiya; Murayama, Yoji

    2007-07-01

    JRR-3(Japan Research Reactor No.3) has been operated for more than 15 years after the modification, without significant troubles by carrying out maintenance such as the preventive maintenance (mainly time-based maintenance) for the safety-grade equipments and the breakdown maintenance for the non-safety-grade equipments. Unscheduled shutdowns causes by aged non-safety-grade equipments have been increasing, and the resources such as budgets have been decreasing year by year. In this situation, JRR-3 maintenance program was reviewed about safety, reliability and economic efficiency. This report offers the policy of the maintenance review and the future direction of maintenance programs. (author)

  8. Advanced maintenance research programs

    International Nuclear Information System (INIS)

    Marston, T.U.; Gelhaus, F.; Burke, R.

    1985-01-01

    The purpose of this paper is to provide the reader with an idea of the advanced maintenance research program at the Electric Power Research Institute (EPRI). A brief description of the maintenance-related activities is provided as a foundation for the advanced maintenance research projects. The projects can be divided into maintenance planning, preventive maintenance program development and implementation, predictive (or conditional) maintenance, and innovative maintenance techniques. The projects include hardware and software development, human factors considerations, and technology promotion and implementation. The advanced concepts include: the incorporation of artificial intelligence into outage planning; turbine and pump maintenance; rotating equipment monitoring and diagnostics with the aid of expert systems; and the development of mobile robots for nuclear power plant maintenance

  9. Integrated maintenance program (IMP)

    International Nuclear Information System (INIS)

    Zemdegs, R.T.; Chout, Q.B.

    1998-01-01

    Approaches to the maintenance of nuclear power plants have undergone significant change in the past several decades. The traditional breakdown approach has been displaced by preventive (calendar-based) maintenance and more recently, by condition-based maintenance (CBM). This is largely driven by the fact that traditional maintenance programs, derived primarily from equipment vendor recommendations, are generally unsuccessful in controlling maintenance costs or equipment failures. Many advances in the maintenance field have taken place since the maintenance plans for Ontario Hydro's nuclear plants were initially established. Ontario Hydro nuclear plant operating costs can be substantially reduced and Incapability Factor improved with the application of modern maintenance processes and tools. Pickering is designated as the lead station for IMP. Of immediate concern is the fact that Pickering Nuclear Division has been experiencing a significant backlog of Operating Preventive Maintenance Callups. This backlog, over 2000, is unacceptable to both station management and the nuclear regulator, the Atomic Energy Control Board. In addition there are over 500 callups in various stages of revision (in hyperspace) without an adequate control nor reporting system to manage their completion. There is also considerable confusion about the classification of l icensing c allups, e.g. callups which are mandatory as a result of legal requirements. Furthermore the ineffectiveness of the Preventive Maintenance (PM) has been the subject of peer audits and Atomic Energy Control Board (AECB) findings over the past several years. The current preventive maintenance ratio PM2 /(PM+CM3) at Pickering ND is less than 20%, due to the current high load of equipment breakdown. This past summer, an Independent Integrated Performance Assessment (IIPA) review at Ontario Hydro confirmed these concerns. Over the past several years, Ontario Hydro nuclear staff have evaluated several programs to improve

  10. Maintenance program guidelines for programmatic equipment

    International Nuclear Information System (INIS)

    1994-11-01

    The Division Directors at Lawrence Berkeley Laboratory are responsible for implementing a maintenance program for research equipment (also referred to as programmatic equipment) assigned to them. The program must allow maintenance to be accomplished in a manner that promotes operational safety, environmental protection and compliance, and cost effectiveness; that preserves the intended functions of the facilities and equipment; and that supports the programmatic mission of the Laboratory. Programmatic equipment -- such as accelerators, lasers, radiation detection equipment, and glove boxes -- is dedicated specifically to research. Installed equipment, by contrast, includes the mechanical and electrical systems installed as part of basic building construction, equipment essential to the normal functioning of the facility and its intended use. Examples of installed equipment are heating, ventilating, and air conditioning systems; elevators; and communications systems. The LBL Operating and Assurance Program Plan (PUB-3111, Revision 4) requires that a maintenance program be prepared for programmatic equipment and defines the basic maintenance program elements. Such a program of regular, documented maintenance is vital to the safety and quality of research activities. As a part of that support, this document offers guidance to Laboratory organizations for developing their maintenance programs. It clarifies the maintenance requirements of the Operating and Assurance Program (OAP) and presents an approach that, while not the only possibility, can be expected to produce an effective maintenance program for research equipment belonging to the Laboratory's organizations

  11. Program integration of predictive maintenance with reliability centered maintenance

    International Nuclear Information System (INIS)

    Strong, D.K. Jr; Wray, D.M.

    1990-01-01

    This paper addresses improving the safety and reliability of power plants in a cost-effective manner by integrating the recently developed reliability centered maintenance techniques with the traditional predictive maintenance techniques of nuclear power plants. The topics of the paper include a description of reliability centered maintenance (RCM), enhancing RCM with predictive maintenance, predictive maintenance programs, condition monitoring techniques, performance test techniques, the mid-Atlantic Reliability Centered Maintenance Users Group, test guides and the benefits of shared guide development

  12. The effect of an expressive writing intervention (EWI) on stress in infertile couples undergoing assisted reproductive technlogy (ART) treatment: A randomized controlled pilot study

    DEFF Research Database (Denmark)

    Matthiesen, Signe Maria Schneevoigt; Klonoff-Cohen, Hillary; Zachariae, Robert

    2012-01-01

    Objectives. Infertile couples undergoing fertility treatments may experience stress and could benefit from psychological intervention. Expressive Writing Intervention (EWI) has shown promising results on various psychological outcomes, yet only one study has applied the method to infertility......-related stress. Our aim was to assess feasibility and effectiveness of EWI for patients in treatment with Assisted Reproductive Technology (ART). Design and participants. Patients enrolling in their first ART treatment at the fertility clinic, Aarhus University Hospital, Denmark were offered to participate....... A total of 82 participants (45 women, 37 men), mean age: 33.17, were randomized to home-based EWI or neutral writing control group and completed an infertility-related stress questionnaire at treatment enrollment, 3 weeks later (at the time of down regulation), and 6 weeks after the intervention...

  13. Improving regulatory oversight of maintenance programs

    International Nuclear Information System (INIS)

    Cook, S.

    2008-01-01

    Safe nuclear power plant operation requires that risks due to failure or unavailability of Structures, Systems and Components (SSCs) be minimized. Implementation of an effective maintenance program is a key means for achieving this goal. In its regulatory framework, the important relationship between maintenance and safety is acknowledged by the CNSC. A high level maintenance program requirement is included in the Class I Facilities Regulations. In addition, the operating licence contains a condition based on the principle that the design function and performance of SSCs needs to remain consistent with the plant's design and analysis documents. Nuclear power plant licensees have the primary responsibility for safe operation of their facilities and consequently for implementation of a successful maintenance program. The oversight role of the Canadian Nuclear Safety Commission (CNSC) is to ensure that the licensee carries out that responsibility. The challenge for the CNSC is how to do this consistently and efficiently. Three opportunities for improvement to regulatory maintenance oversight are being pursued. These are related to the regulatory framework, compliance verification inspection activities and monitoring of self-reporting. The regulatory framework has been improved by clarifying expectations through the issuance of S-210 'Maintenance Programs for Nuclear Power Plants'. Inspection activities have been improved by introducing new maintenance inspections into the baseline program. Monitoring is being improved by making better use of self-reported and industry produced maintenance related performance indicators. As with any type of program change, the challenge is to ensure the consistent and optimal application of regulatory activities and resources. This paper is a summary of the CNSC's approach to improving its maintenance oversight strategy. (author)

  14. MOV predictive maintenance program at Darlington NGS

    International Nuclear Information System (INIS)

    Morrison, J.F.

    1992-01-01

    This paper details the Motor Operated Valve (MOV) Predictive Maintenance program at Darlington Nuclear Generating Station. The program encompasses the use of diagnostics tooling in conjunction with more standard maintenance techniques, with the goal of improving performance of MOV's. Problems encountered and solutions developed during the first two phases of this program are presented, along with proposed actions for the final trending phase of the program. This paper also touches on the preventive and corrective maintenance aspects of an overall MOV maintenance program. 6 refs., 6 tabs., 6 figs

  15. Maintenance improvement program

    International Nuclear Information System (INIS)

    Derbonne, D.R.; Plunkett, T.F.; Simpson, J.R.

    1989-01-01

    During fuel cycle 1 at River Bend station, considerable effort was expended to reduce corrective maintenance work orders (MWOs) to <1,000. This was done by complementing the plant staff with costly contract personnel. Coming out of the first refueling outage, most contract personnel were released. The change in MWO backlog started a steady rise. It became readily apparent that to avoid costly contract staff time, a maintenance improvement program (MIP) was necessary. The MIP Was primarily directed at two areas: crew efficiency improvements and improved preplanned MWO packages. The overall effect of the MIP was to achieve significant productivity improvements with reduced operation and maintenance cost by providing frequent accountability to all levels of maintenance supervision. The MIP also produced a feeling of pride among the maintenance department employees that had not really existed before. This was the best benefit of all

  16. European energy supply in the light of globalization. Impression from the EWI/FAZ energy conference; Europaeische Energieversorgung im Zeichen der Globalisierung. Eindruecke von der EWI/FAZ-Energiekonferenz

    Energy Technology Data Exchange (ETDEWEB)

    Kienle, F. [Kienle Consultants, Berlin (Germany)

    2005-11-28

    Discussions about how rising energy prices can be reconciled with functioning competition or prices are simple effluents of a the market power of a tight oligopol, like it is often claimed by politicians and poindustries of high power demand without further proofs, shaped alike the energy conference of EWI (energy economics institute at the university of Cologne) and FAZ (Frankfurter Allgemeine Zeitung) an September 13th 2005. There was an agreement, that energy markets are less shaped nationally but out of Brussels.

  17. Maintenance procedure upgrade programs

    International Nuclear Information System (INIS)

    Campbell, J.J.; Zimmerman, C.M.

    1988-01-01

    This paper describes a systematic approach to upgrading nuclear power plant maintenance procedures. The approach consists of four phases: diagnosis, program planning, program implementation, and program evaluation. Each phase is explained as a series of steps to ensure that all factors in a procedure upgrade program are considered

  18. BWR Services maintenance training program

    International Nuclear Information System (INIS)

    Cox, J.H.; Chittenden, W.F.

    1979-01-01

    BWR Services has implemented a five-phase program to increase plant availability and capacity factor in operating BWR's. One phase of this program is establishing a maintenance training program on NSSS equipment; the scope encompasses maintenance on both mechanical equipment and electrical control and instrumentation equipment. The program utilizes actual product line equipment for practical Hands-on training. A total of 23 formal courses will be in place by the end of 1979. The General Electric Company is making a multimillion dollar investment in facilities to support this training. These facilities are described

  19. Probabilistic methods for maintenance program optimization

    International Nuclear Information System (INIS)

    Liming, J.K.; Smith, M.J.; Gekler, W.C.

    1989-01-01

    In today's regulatory and economic environments, it is more important than ever that managers, engineers, and plant staff join together in developing and implementing effective management plans for safety and economic risk. This need applied to both power generating stations and other process facilities. One of the most critical parts of these management plans is the development and continuous enhancement of a maintenance program that optimizes plant or facility safety and profitability. The ultimate objective is to maximize the potential for station or facility success, usually measured in terms of projected financial profitability, while meeting or exceeding meaningful and reasonable safety goals, usually measured in terms of projected damage or consequence frequencies. This paper describes the use of the latest concepts in developing and evaluating maintenance programs to achieve maintenance program optimization (MPO). These concepts are based on significant field experience gained through the integration and application of fundamentals developed for industry and Electric Power Research Institute (EPRI)-sponsored projects on preventive maintenance (PM) program development and reliability-centered maintenance (RCM)

  20. Elements of a total MOV maintenance program

    International Nuclear Information System (INIS)

    Lavallee, W.L.

    1989-01-01

    Establishing a good preventive and predictive maintenance program for motor-operated valves (MOVs) is an especially challenging task for nuclear power plants. Because of the sheer number of MOVs involved, all with somewhat different characteristics and requirements, and the extremely critical functions that some of the MOVs perform, the maintenance program quickly becomes a major exercise in coordination. This paper outlines a three-phase approach to achieving a comprehensive MOV maintenance program. It is based on experience in assisting nuclear plants with their MOV programs and encountering many of the pitfalls that can hamper these programs. The three phases include up-front engineering preparation, field diagnostic testing, and maintenance follow-up and trending. Each of these phases is discussed, and a flowchart describing the individual elements of each phase is provided

  1. Maintenance program decision-making utilizing crash data.

    Science.gov (United States)

    2013-07-01

    This document describes methods that may be used by UDOT Maintenance personnel to improve highway safety. Four programs have been recommended using crash data to make more informed decisions concerning maintenance programs as follows: : Snow & Ic...

  2. Maintenance philosophy and program at Cernavoda NPP

    International Nuclear Information System (INIS)

    Bobos, M.; Enciu, G.

    1994-01-01

    Maintenance plays a key role in ensuring safe and reliable operation. An effective maintenance program should ensure that installed equipment operates when needed and the equipment malfunctions or deficiencies are corrected in time and rarely recur. Maintenance includes not only the activities traditionally associated with identifying or correcting current or potential equipment deficiencies but also extends to supporting technical functions for the conduct of these activities (for example, engineering, technical support, chemistry control, radiological protection, industrial safety and training). The maintenance management program should clearly define the relationship among these supporting groups as it is related to overall plant maintenance and promotes the concept of a successful integrated team effort. (Author)

  3. 25 CFR 170.804 - How is BIA's Road Maintenance Program related to the IRR Program?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How is BIA's Road Maintenance Program related to the IRR... WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.804 How is BIA's Road Maintenance Program related to the IRR Program? The following chart illustrates how BIA's Road Maintenance Program is...

  4. RCM [reliability-centered maintenance] at Ginna: Preventive maintenance program optimization at year 20

    International Nuclear Information System (INIS)

    Edgar, E.C.

    1989-01-01

    The reliability-centered maintenance (RCM) program at Rochester Gas ampersand Electric Company's Ginna station is entering its second year. Of the 20 systems originally selected for evaluation, 10 are in various stages of completion, and recommendations resulting from the earliest systems studied are now being implemented. As expected, few major discoveries have been made in terms of preventive maintenance program failings or excesses. The performance of the now 20-yr-old plant has been excellent in recent years, and objectives focus more on ensuring continued high standards of safety, reliability, and economy than on maintenance program cost reduction

  5. After reliability centred maintenance. Preventive maintenance living program implementation at Bruce Power

    International Nuclear Information System (INIS)

    Harazim, Michael L.; Ferguson, Brian J.

    2003-01-01

    Industrial preventive maintenance (PM) programs represent a large part of plant O and M costs. PM Optimization (PMO) projects represent an effective mechanism for identifying unnecessary PM, extending PM intervals and infusing predictive maintenance (PdM) methods. However, once optimized, what process prevents the PM program from returning to a state of disarray? This is the function of a PM living program (PMLP). In 1997, an independent performance assessment identified concerns with the applicability and effectiveness of all Ontario Power Generation, Inc. (OPGI) PM programs. In response, OPGI instituted an Integrated Maintenance Program (IMP) including Reliability Centred Maintenance (RCM) and a PMLP. It should be noted that the PMLP was developed for the 3 OPGI nuclear Sites (i.e. Bruce, Pickering, and Darlington). Effective 1 May 2001, the Bruce Site has been leased to a group of investors lead by British Energy. This paper is written in historical context and therefore refers to the Bruce Site as part of OPGI. The PMLP is made up of five elements: 1) process control, 2) change control, 3) worker feedback, 4) program performance metrics, and 5) deferral module. A PMLP software tool, originally applied to Duke Energy nuclear plants, was enhanced and customized specifically for the OPGI PMLP, and then implemented at all three of OPGI's nuclear sites. The objective of the OPGI PMLP was to: Provide processes/procedures for continual optimization of all site PM tasks, Ensure effective and timely revision of PM tasks in the work management system, Ensure PM tasks remain applicable/effective at all times, Maintain and enhance PM consistency on a component, system and Site basis, Ensure that new predictive maintenance techniques are applied and integrated with the PM program, Ensure that mandated PM tasks are identified and executed, Provide a mechanism for craft feedback, Meet regulatory requirements for PM program effectiveness, and Provide PM task deferral

  6. Reliability-based maintenance evaluations and standard preventive maintenance programs

    International Nuclear Information System (INIS)

    Varno, M.; McKinley, M.

    1993-01-01

    Due to recent issuance of 10CFR50.65, the U.S. Nuclear Regulatory Commission maintenance rule (Rule), and the open-quotes Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plantsclose quotes prepared by the Nuclear Management and Resources Council, many utilities are undertaking review or evaluation of current preventive maintenance (PM) programs. Although PM optimization and documentation are not specifically required by the Rule, an appropriate and effective PM program (PMP) will be the cornerstone of the successful and cost-effective implementation of the Rule. Currently, a project is being conducted at the Vermont Yankee Nuclear Power Station (VYNPS) in conjunction with Quadrex Energy Services to evaluate, optimize, and document the PMP. The project began in March 1993 and is scheduled for completion in mid-1995. The initial scope for the project is the evaluation of those structures, systems, and components that are within the scope of the Rule. Because of the number of systems to be evaluated (∼50), the desired completion schedule, and cost considerations, a streamlined approach to PM optimization and documentation is being utilized

  7. Reliability centered Maintenance (RCM) program for Chashma NPP (CHASNUPP)

    International Nuclear Information System (INIS)

    Khalid, S.; Khan, S.A.

    2000-01-01

    This paper describes the proposed Reliability Centered Maintenance (RCM) program for Chashma Nuclear Power Plant (CHASNUPP). Major steps are the identification of risk critical components and the implementation of RCM procedures. Identification of risk critical components is based upon the CHASNUPP level 1 PSA results (performed under IAEA TC Project PAK/9/019) which is near completion. The other requirements for implementation of RCM program is the qualitative analysis to be performed for identifying the dominant potential failure modes of each risk critical component and determination of the necessary maintenance activities, required to ensure reliable operation of the identified risk critical components. Implementation of RCM program for these components will lead to improvement in plant availability and safety together with reduction in the maintenance cost. Development - implementation of RCM program at this stage will help the CHASNUPP Maintenance department who is now developing the maintenance program - procedures for CHASNUPP. (author)

  8. 25 CFR 170.801 - What is the BIA Road Maintenance Program?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What is the BIA Road Maintenance Program? 170.801 Section... ROADS PROGRAM BIA Road Maintenance § 170.801 What is the BIA Road Maintenance Program? The BIA Road... subpart contains a list of activities that are eligible for funding under the BIA road maintenance program. ...

  9. 25 CFR 170.2 - What is the IRR Program and BIA Road Maintenance Program policy?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What is the IRR Program and BIA Road Maintenance Program... and BIA Road Maintenance Program policy? (a) It is the policy of the Secretary of the Interior and the... designed to enable Indian tribes to participate in all contractible IRR and BIA Road Maintenance programs...

  10. Building Maintenance. Florida Vocational Program Guide.

    Science.gov (United States)

    University of South Florida, Tampa. Dept. of Adult and Vocational Education.

    This program guide identifies primary concerns in the organization, operation, and evaluation of a building maintenance program. It is designed for local school district and community college administrators, instructors, program advisory committees, and regional coordinating councils. The guide begins with the Dictionary of Occupational Titles…

  11. Using systematic aging assessments to improve effectiveness of plant maintenance programs

    International Nuclear Information System (INIS)

    Watson, P.; Yang, J.X.; Dam, R.F.; Nickerson, J.H.

    2003-01-01

    Nuclear plant equipment aging assessment studies provided by AECL include life assessments, condition assessments or systematic assessments of maintenance. AECL has developed several tools to apply the results of aging assessment studies to improve the effectiveness of actual plant maintenance programs. The Systematic Assessment of Maintenance and the SYSTMS tool generate maintenance tasks for a system. The System Maintenance Datastore tool assesses the maintenance resources on a system basis, and can thus quantify the savings realized by optimizing the maintenance program. Long term trends in condition-based maintenance due to component aging can be predicted, and resource savings due to optimum timing of component replacement or general plant refurbishment can be quantified. The System based Adaptive Maintenance Process ensures the maintenance program is continually updated to reflect the latest plant equipment condition and maintenance strategy information. (author)

  12. Long-period maintenance program of JRR-3M

    International Nuclear Information System (INIS)

    Murayama, Yoji; Onozaki, Michio; Kakefuda, Kazuhiro

    1999-01-01

    The JRR-3M is a swimming pool type research reactor with maximum thermal output of 20 MW, classed in a large-scale research reactor and composed of numerous facilities. An operation cycle consists of 4 weeks of continuously reactor operation and 1 week of shutdown work such as fuel exchange and irradiation sample handling. The temporary and small-scale maintenance is also carried out during the shutdown period. Systematic maintenance period through a year usually follows 2 stages. The former stage of about 4 weeks is prepared to maintain the general facilities related to the overall reactor system such as computer system. The latter stage of about 9 weeks is prepared to maintain the other individual facilities such as cooling facilities and control facilities that are to be inspected by the regulatory body. Since preventive maintenance is required in order to achieve an improvement of safety, reliability and availability throughout the life cycle of the reactor, a long-period maintenance program should be prepared properly in consideration of an ageing degradation of the facilities. The long-period maintenance program of JRR-3M, which determines not only the replacement frequency but also the maintenance frequency of the facilities, is made on the basis of an ageing degradation of the facilities, irradiation effects of the materials, recommendations from the manufacturer and JRR-3M maintenance records. The replacement frequency recommended by the manufacturer is examined from the viewpoint of the safety significance of the facilities and availability of the components. The program is arranged so that it may not concentrate the replacement of the facilities in the specific fiscal year and smooth the budget and maintenance period throughout the life cycle of the reactor. There have been two unanticipated failures of the facilities, which required rearranging the program. (author)

  13. Program strategies for maintenance management, organization and planning

    International Nuclear Information System (INIS)

    Czegeny, J.I.

    2003-01-01

    In this paper we look respectively at three specific examples showing program strategies for maintenance management, organization and planning. Starting with preventive maintenance optimization, we will look at one Bruce B Predefined task on the Reactor Regulating System to illustrate reduced maintenance requirement, a maintenance management strategy. Next discussed is the organizational strategy at Darlington to have an engineering program meet the jurisdictional requirements for maintaining certification for TSSA registered pressure vessels. The last look-see will show the earned value of the planning for the first Pickering A unit to be returned to service. Finally all the above is tied together in a compare and contrast of what works and what could be improved upon. (author)

  14. Massachusetts Early Warning Indicator System (EWIS). "Technical Descriptions of Risk Model Development": Middle and High School Age Groupings (Grades 7-12)

    Science.gov (United States)

    Massachusetts Department of Elementary and Secondary Education, 2013

    2013-01-01

    The Massachusetts Department of Elementary and Secondary Education (Department) created the grades 1-12 Early Warning Indicator System (EWIS) in response to district interest in the Early Warning Indicator Index (EWII) that the Department previously created for rising grade 9 students. Districts shared that the EWII data were helpful, but also…

  15. Massachusetts Early Warning Indicator System (EWIS). "Technical Descriptions of Risk Model Development": Early and Late Elementary Age Groupings (Grades 1-6)

    Science.gov (United States)

    Massachusetts Department of Elementary and Secondary Education, 2013

    2013-01-01

    The Massachusetts Department of Elementary and Secondary Education (Department) created the grades 1-12 Early Warning Indicator System (EWIS) in response to district interest in the Early Warning Indicator Index (EWII) that the Department previously created for rising grade 9 students. Districts shared that the EWII data were helpful, but also…

  16. Preventive maintenance program of motorized operated valves (MOV) at Cernavoda NPP

    International Nuclear Information System (INIS)

    Groza, M.; Moldoveanu, Edy

    2001-01-01

    This is a Power Point presentation. The following objectives are addressed: A. Determine the target of MOV program; B. Define the strategy for MOV; C. Establish the MOV program execution phases; D. Identification of key parameters; E. Examples. The target of MOV program is to improve the safety by ensuring the adequacy of safety valves and the reliability of safety equipment and, subsequently, to ensure the economic operation of the plant. Consequences of MV malfunction are indicated. The strategy for MOV program development is both general, namely, to define the minimal requirements of preventive /corrective maintenance activities for all MOV's according to design/ manufacture specification and particular, namely to identify MV's specific problems and the need for increasing/decreasing the preventing maintenance tasks or frequency established in 'general' MOV program. Strategy for MOV program development implies: - Establish MOV program applicability; - Develop diagnostic strategy (define key parameters ); - Perform program for engineering review; - Establish program for preventive maintenance; - Revise procedures for operating and maintenance tests; - Dynamic evaluation of MOV. The program execution phases are listed as follows: 1. Perform risk assessment of the MOV's to determine criticality level (program applicability); 2. Collect data to fill in MOV Application Data Sheet; 3. Perform engineering review to determine functional parameters acceptable range and determine key parameters; 4. Analysis for maintenance tasks / frequencies selection and determination of implementing actions (engineer review); 5. Prepare work packages for availability confirmation; 6. Schedule and plan corrective actions or provide input to other programs; 7. Schedule and plan implementing actions in preparation for program field execution; 8. Program field implementation; 9. Program monitoring, evaluation and optimization. The criteria defining the key operational and maintenance

  17. Establishing a predictive maintenance program at the Hanford Site

    International Nuclear Information System (INIS)

    Winslow, R.W.

    1994-05-01

    This document contains information about a new Predictive Maintenance Program being developed and implemented at the Hanford Reservation. Details of the document include: background on persons developing the program, history of predictive maintenance, implementation of new program, engineering task analysis, network development and new software, issues to be resolved, benefits expected, and appendix gives information about the symposium from which this paper is based

  18. A study on maintenance rule program and its application at Korean NPPs

    International Nuclear Information System (INIS)

    Hwang, Mee Jeong; Kim, Kil Yoo; Kang, Dae Il; Yang, Joon Eon; Ha, Jae Joo

    2000-11-01

    The objective of the Maintenance Rule is to require monitoring of the overall continuing effectiveness of licensee maintenance programs to ensure that safety related and certain nonsafety-related SSCs are capable of performing their intended functions and, for nonsafety-related equipment failures will not occur that prevent the fulfillment of safety-related functions, and failures resulting in scrams and unnecessary actuations of safety-related systems are minimized. That is, proper maintenance is essential to plant safety. U.S. Maintenance Rule, which was effective July 1996 in USA., was not officially adopted in Korea by Korean regulatory body. However, since many PSA and IPE have been performed for NPPs, the philosophy and usefulness of the Maintenance Rule as well as performance-based regulation are being acceptable. We survey the Maintenance Rule program and applications in the USA, and also developed the Maintenance Rule program to apply to Korean NPPs. In addition, we applied the Maintenance Rule Program apply to Ulchin 3,4 Units roughly with the Maintenance Rule Program developed in this project

  19. A study on maintenance rule program and its application at Korean NPPs

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, Mee Jeong; Kim, Kil Yoo; Kang, Dae Il; Yang, Joon Eon; Ha, Jae Joo

    2000-11-01

    The objective of the Maintenance Rule is to require monitoring of the overall continuing effectiveness of licensee maintenance programs to ensure that safety related and certain nonsafety-related SSCs are capable of performing their intended functions and, for nonsafety-related equipment failures will not occur that prevent the fulfillment of safety-related functions, and failures resulting in scrams and unnecessary actuations of safety-related systems are minimized. That is, proper maintenance is essential to plant safety. U.S. Maintenance Rule, which was effective July 1996 in USA., was not officially adopted in Korea by Korean regulatory body. However, since many PSA and IPE have been performed for NPPs, the philosophy and usefulness of the Maintenance Rule as well as performance-based regulation are being acceptable. We survey the Maintenance Rule program and applications in the USA, and also developed the Maintenance Rule program to apply to Korean NPPs. In addition, we applied the Maintenance Rule Program apply to Ulchin 3,4 Units roughly with the Maintenance Rule Program developed in this project.

  20. 14 CFR 129.113 - Fuel tank system maintenance program.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Fuel tank system maintenance program. 129... Continued Airworthiness and Safety Improvements § 129.113 Fuel tank system maintenance program. (a) Except... on which an auxiliary fuel tank is installed under a field approval, before June 16, 2008, the...

  1. 14 CFR 121.1113 - Fuel tank system maintenance program.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Fuel tank system maintenance program. 121... Improvements § 121.1113 Fuel tank system maintenance program. (a) Except as provided in paragraph (g) of this... capacity of 7500 pounds or more. (b) For each airplane on which an auxiliary fuel tank is installed under a...

  2. A comprehensive approach to RCM-based preventive maintenance program development

    International Nuclear Information System (INIS)

    Hall, B.E.; Davis, T.; Pennington, A.J.

    1988-01-01

    In late 1986, Public Service Electric and Gas Company (PSE ampersand G) concluded that to support its vision and strategic planning it would be necessary to develop a consistent approach to maintenance for all nuclear units at the artificial island. General Physics Corporation was selected to lead a consultant team to support full-scale development of a preventive maintenance (PM) program for Salem and Hope Creek generating stations based on a reliability-centered maintenance (RCM) approach. RCM was selected because it represents a systematic approach to developing a PM program that provides a logical, consistent, and traceable methodology and produces a well-documented engineering basis for the program. Early in 1987, primary objectives for the PM program were defined. The Phase I tasks addressed key programmatic areas such as maintenance philosophy, procedures, condition monitoring, performance trending, equipment failure data base, ogranization, PM program effectiveness evaluation, RCM process, reliability/availability modeling, information management, training, spare parts, software/hardware, and commitments. Phase I of the PM program development project was completed in January 1988. Highlights of the Phase I work and the PM program manual are described

  3. Method and computer program product for maintenance and modernization backlogging

    Science.gov (United States)

    Mattimore, Bernard G; Reynolds, Paul E; Farrell, Jill M

    2013-02-19

    According to one embodiment, a computer program product for determining future facility conditions includes a computer readable medium having computer readable program code stored therein. The computer readable program code includes computer readable program code for calculating a time period specific maintenance cost, for calculating a time period specific modernization factor, and for calculating a time period specific backlog factor. Future facility conditions equal the time period specific maintenance cost plus the time period specific modernization factor plus the time period specific backlog factor. In another embodiment, a computer-implemented method for calculating future facility conditions includes calculating a time period specific maintenance cost, calculating a time period specific modernization factor, and calculating a time period specific backlog factor. Future facility conditions equal the time period specific maintenance cost plus the time period specific modernization factor plus the time period specific backlog factor. Other embodiments are also presented.

  4. The International Coal Statistics Data Base program maintenance guide

    International Nuclear Information System (INIS)

    1991-06-01

    The International Coal Statistics Data Base (ICSD) is a microcomputer-based system which contains information related to international coal trade. This includes coal production, consumption, imports and exports information. The ICSD is a secondary data base, meaning that information contained therein is derived entirely from other primary sources. It uses dBase III+ and Lotus 1-2-3 to locate, report and display data. The system is used for analysis in preparing the Annual Prospects for World Coal Trade (DOE/EIA-0363) publication. The ICSD system is menu driven and also permits the user who is familiar with dBase and Lotus operations to leave the menu structure to perform independent queries. Documentation for the ICSD consists of three manuals -- the User's Guide, the Operations Manual, and the Program Maintenance Manual. This Program Maintenance Manual provides the information necessary to maintain and update the ICSD system. Two major types of program maintenance documentation are presented in this manual. The first is the source code for the dBase III+ routines and related non-dBase programs used in operating the ICSD. The second is listings of the major component database field structures. A third important consideration for dBase programming, the structure of index files, is presented in the listing of source code for the index maintenance program. 1 fig

  5. Cost effectiveness of the MDOT preventive maintenance program.

    Science.gov (United States)

    2013-04-01

    The Michigan Department of Transportations (MDOT) pavement preservation program dates back to 1992. MDOTs pavement preservation strategy is primarily implemented through its capital preventive maintenance (CPM) program, in which preventive main...

  6. Laboratory services series: a master-slave manipulator maintenance program

    International Nuclear Information System (INIS)

    Jenness, R.G.; Hicks, R.E.; Wicker, C.D.

    1976-12-01

    The volume of master slave manipulator maintenance at Oak Ridge National Laboratory has necessitated the establishment of a repair facility and organization of a specially trained group of craftsmen. Emphasis on cell containment requires the use of manipulator boots and development of precise procedures for accomplishing the maintenance of 287 installed units. A very satisfactory computer programmed maintenance system has been established at the Laboratory to provide an economical approach to preventive maintenance

  7. 25 CFR 170.803 - What facilities are eligible under the BIA Road Maintenance Program?

    Science.gov (United States)

    2010-04-01

    ... AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.803 What facilities are eligible under the BIA Road Maintenance Program? (a) The following public transportation facilities are eligible for maintenance under the BIA Road Maintenance Program: (1) BIA transportation facilities listed in...

  8. National Synchrotron Light Source Facility Manual Maintenance Management Program. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Fewell, N.

    1993-12-01

    The purpose of this program s to meet the policy and objectives for the management and performance of cost-effective maintenance and repair of the National Synchrotron Light Source, as required by the US Department of Energy order DOE 433O.4A. It is the DOE`s policy that: The maintenance management program for the NSLS be consistent with this Order and that NSLS property is maintained in a manner which promotes operational safety, worker health, environmental protection and compliance, property preservation, and cost-effectiveness while meeting the NSLS`s programmatic mission. Structures, components and systems (active and passive) that are imporant to safe operation of the NSLS shall be subject to a maintenance program to ensure that they meet or exceed their design requirements throughout the life of the NSLS. Periodic examination of structures, systems components and equipment be performed to determine deterioration or technical obsolescence which may threaten performance and/or safety. Primary responsibility, authority, and accountability for the direction and management of the maintenance program at the NSLS reside with the line management assigned direct programmatic responsibility. Budgeting and accounting for maintenance programs are consistent with DOE Orders guidance.

  9. Long-Term Weight Maintenance after a 17-Week Weight Loss Intervention with or without a One-Year Maintenance Program: A Randomized Controlled Trial

    Directory of Open Access Journals (Sweden)

    Tuula Pekkarinen

    2015-01-01

    Full Text Available Background. Weight lost by obese patients is almost always regained over time. Extended treatment may improve maintenance, but solid evidence is lacking. Purpose. We determined effectiveness of maintenance therapy after a weight loss program. Methods. Together 201 patients (mean age 47 years and BMI 42 kg/m2, 71% women were randomly assigned to either a 17-week weight loss program followed by a one-year maintenance program or to a weight loss program without subsequent maintenance intervention. The weight loss program included behavior modification and a very-low-calorie diet, and maintenance program behavior modification. The primary outcome measure was percentage of patients with 5% or more weight loss at the end of maintenance (week 69 and one year later (week 121. Secondary outcomes were weight related changes in lifestyle and quality of life. Results. At week 69, 52% of the patients with and 44% of those without maintenance program had lost weight ≥5%, P=0.40, and, at week 121, 33% and 34%, P=0.77, respectively. At week 121 secondary outcomes did not differ between the groups among those successfully followed up. Conclusions. This one-year maintenance program was not effective in preventing weight regain in severely obese patients. Trial Registration. This trial is registered under clinicaltrials.gov Identifier: NCT00590655.

  10. Implementing a Reliability Centered Maintenance Program at NASA's Kennedy Space Center

    National Research Council Canada - National Science Library

    Tuttle, Raymond

    1998-01-01

    .... A reliability centered maintenance (RCM) program seeks to offer equal or greater reliability at decreased cost by insuring only applicable, effective maintenance is performed and by in large part replacing time based maintenance...

  11. 14 CFR 91.1411 - Continuous airworthiness maintenance program use by fractional ownership program manager.

    Science.gov (United States)

    2010-01-01

    ... program use by fractional ownership program manager. 91.1411 Section 91.1411 Aeronautics and Space FEDERAL... airworthiness maintenance program use by fractional ownership program manager. Fractional ownership program... through 91.1443. Any program manager who elects to maintain the program aircraft using a continuous...

  12. A study on maintenance rule program and its application to Korean NPP - Rev.1

    International Nuclear Information System (INIS)

    Hwang, Mee Jeong; Kim, Kil Yoo; Yang, Joon Eon; Ha, Jae Joo

    2001-03-01

    The objective of the Maintenance Rule is to require monitoring of the overall continuing effectiveness of licensee maintenance programs to ensure that safety related and certain nonsafety-related SSCs are capable of performing their intended functions and, for nonsafety-related equipment failures will not occur that prevent the fulfillment of safety-related functions, and failures resulting in scrams and unnecessary actuations of safety-related systems are minimized. That is, proper maintenance is essential to plant safety. U.S. Maintenance Rule, which was effective July 1996 in USA., was not officially adopted in Korea by Korean regulatory body. However, since many PSA and IPE have been performed for NPPs, the philosophy and usefulness of the Maintenance Rule as well as performance-based regulation are being acceptable. We survey the Maintenance Rule program and applications in the USA, and also developed the Maintenance Rule program to apply to Korean NPPs. In addition, we applied the Maintenance Rule Program apply to Ulchin 3,4 Units roughly with the Maintenance Rule Program developed in this project

  13. A Planned Preventive Maintenance Program. A Handbook for Chief Business Officers and Supervisors of Maintenance with Suggestions on Maintenance for Consideration by Presidents of Higher Institutions.

    Science.gov (United States)

    Daniel, Clarence H.

    This handbook explains planned preventive maintenance program, which is an operational system of maintenance designed to increase the effectiveness of the maintenance staff and the use of maintenance funds through efficient scheduling of inspections and follow-through of work to be performed. Sections are included for the chief administrative…

  14. Enhanced human performance of utility maintenance programs

    International Nuclear Information System (INIS)

    Fresco, A.; Haber, S.; O'Brien, J.

    1993-01-01

    Assuring the safe operation of a nuclear power plant depends, to a large extent, on how effectively one understands and manages the aging-related degradation that occurs in structures, systems, and components (SSCs). Aging-related degradation is typically managed through a nuclear plant's maintenance program. A review of 44 Maintenance Team Inspection (MTI) Reports indicated that while some plant organizations appeared to assume a proactive mode in preventing aging-related failures of their SSCs important to safety, others seemed to be taking a passive or reactive mode. Across all plants, what is clearly needed, is a strong recognition of the importance of aging-related degradation and the use of existing organizational assets to effectively detect and mitigate those effects. Many of those assets can be enhanced by the consideration of organizational and management factors necessary for the implementation of an effective aging management program. This report provides a discussion of this program

  15. 21 CFR 1271.160 - Establishment and maintenance of a quality program.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Establishment and maintenance of a quality program... Establishment and maintenance of a quality program. (a) General. If you are an establishment that performs any... corrective actions relating to core CGTP requirements, including reaudits of deficiencies, are taken and...

  16. Status of the reliability centered maintenance program at Ontario Hydro's Bruce 'A' Nuclear Division

    International Nuclear Information System (INIS)

    Khan, I.

    1995-01-01

    Bruce A started a preventive maintenance (PM) quality improvement program in August of 1991. This initiative was taken to address the concerns expressed by the AECB and the Peer Audits finding. The concerns were on the quality of the Bruce A PM Program and its execution in the field. Reliability Centered Maintenance (RCM) analysis was selected as the PM program quality improvement and optimization technique. Therefore, RCM became a key component of Bruce A's Integrated PM program and maintenance strategy. As a result of RCM implementation, and improvements in the work planning and scheduling process, Bruce A is seeing downward trends in the corrective maintenance work load, maintenance preventable forced outages, overdue/missed PM tasks and corrective maintenance backlog. Control Room Operators have reported observing an improvement in systems and equipment response to transients. Other benefits include a documented, controlled and traceable PM program. In addition, the team approach required by RCM has started to improve staff confidence in the PM program which, in turn, is improving the compliance with the PM program. (author)

  17. Florida maintenance rating program (MRP) assessment and enhancement : final report, May 28, 2008 [summary].

    Science.gov (United States)

    2008-01-01

    The Florida Department of Transportation : (FDOT) has used its maintenance rating : program (MRP) to evaluate the states : highway maintenance conditions and : determine asset maintenance needs since : 1985. Periodic evaluation of the program is :...

  18. Building Maintenance and Utilities Management. Florida Vocational Program Guide.

    Science.gov (United States)

    University of South Florida, Tampa. Dept. of Adult and Vocational Education.

    This program guide identifies primary concerns in the organization, operation, and evaluation of a building maintenance and utilities management program. It is designed for local school district and community college administrators, instructors, program advisory committees, and regional coordinating councils. The guide begins with the Dictionary…

  19. The Nordic maintenance care program

    DEFF Research Database (Denmark)

    Malmqvist, Stefan; Leboeuf-Yde, Charlotte

    2009-01-01

    of maintenance care. Previous studies have identified chiropractors' choices of case management strategies in response to different case scenarios. However, the rationale for these management strategies is not known. In other words, when presented with both the case, and different management strategies......Maintenance care is a well known concept among chiropractors, although there is little knowledge about its exact definition, its indications and usefulness. As an initial step in a research program on this phenomenon, it was necessary to identify chiropractors' rationale for their use......, there was consensus on how to match these, but if only the management strategies were provided, would chiropractors be able to define the cases to fit these strategies? The objective with this study was to investigate if there is a common pattern in Finnish chiropractors' case management of patients with low back...

  20. Florida maintenance rating program (MRP) assessment and enhancement : final report, May 28, 2008.

    Science.gov (United States)

    2008-05-28

    The Maintenance Rating Program (MRP), developed in 1985 by FDOT, is a statewide maintenance system aimed : at evaluating the State highway maintenance conditions, and determining FDOT asset maintenance needs. In the : quest for continuous improvement...

  1. A study of adopting maintenance rule under the periodic safety review and reliability centered maintenance program

    International Nuclear Information System (INIS)

    Kilyoo, Kim

    2001-01-01

    U.S Maintenance Rule (MR) has three main functions. One is to monitor the performance changes of SSCs (Structure, System, and Component) caused by risk informed applications. Periodic Safety Review (PSR) program is widely adopted in Europe while it is not adopted in U. S. A where MR and new oversight program are instead used. Recently, in Korea, it was determined to adopt PSR, and the first PSR program has started this year for Kori unit 1 as a pilot plant. Also, a traditional Reliability Centered Maintenance (RCM) has been performed for 4 systems of YGN unit 1 and 2 and it will be applied to the other nuclear power plants in Korea. However, since MR is adopting many useful concept of RCM, traditional RCM could not be further performed without being associated with MR. Thus, MR, RCM and PSR have recently become hot issue policies which should be well associated each other in Korea, and this paper suggests a desirable new maintenance process which would embrace the concepts of the three policies, and also discusses whether U.S. MR is necessary even though a PSR program is already adopted, and if necessary, then how cost-effectively it can be introduced to. (author)

  2. Development of Simulator Maintenance Engineer Qualification Program Draft

    International Nuclear Information System (INIS)

    Chung, Kyung Hun

    2010-01-01

    As of 2009, KHNP has currently seven full scope simulators that are used for training of Nuclear Power Plant (NPP) Operators. Well-trained Simulator Maintenance Engineers (SME) are required to support these simulators. These SMEs will maintain and address any issues identified or any changes required for keep up the simulator with their respective plant sites. These issues will be identified as Simulator Discrepancy Reports (DR) or Work Order (WO) by the simulator operation personnel in KHNP. The simulator maintenance is a very complex. The simulator consists of many areas of process and requires experts in software modeling for different processes such as Neutronics, thermohydraulics, Logics, control, Electrical systems and computer systems as well as hardware subjects such as I and C, I/O, computers, etc. All these areas need experts the subject expertise need to be divided among SME's. In other word the SME's need to be trained for different expertise as well as having different level of SME's. KHNP has seen the need to outsource the maintenance work for these complex simulators. To have one company concentrating on this work will have many benefits such as: · Provides proper and well trained experts · Maintains consistent support personnel · Maintains the maintenance history for the simulator · Coordinates and Maintains the knowledge in house · The simulator maintenance will be consistent In order to accomplish the goals, KEPCO RI has recognized that there is a need for a program to adequately train and qualify the SME's. KEPCO RI and GSE, which has provided 6 simulators among 7 NPP simulators in Korea, have jointly developed this Simulator Maintenance Engineer Qualification Program (SMEQP). After issue of this plan, KEPCO RI will maintain and modify as needed periodically to meet the goals and purpose of the plan

  3. Improved Navy Maintenance Through Corrosion-Fatigue Assessment Program

    National Research Council Canada - National Science Library

    Hoppe, Wally

    2008-01-01

    ... to evaluate issues relevant to corrosion-fatigue of aircraft components. In this multi-year, multi-contract program, tools have been developed to assist in the establishment of maintenance options for corroded components...

  4. Preventive maintenance and reliability-centered maintenance

    International Nuclear Information System (INIS)

    Anderson, J.G.

    1989-01-01

    In the recent past, the primary function of the preventive maintenance program at a nuclear power plant was to maintain the operability and reliability of the plant. Reducing overall maintenance costs by performing effective preventive maintenance, instead of more costly and disruptive corrective maintenance, instead of more costly and disruptive corrective maintenance, was a secondary consideration. In today's operating environment, the preventive maintenance program must meet the test of cost-effectiveness as well as many new standards for performance that are being required by rate regulators. The preventive maintenance program must be able to withstand the challenge of independent audit to a new standard of technical adequacy and compliance with recommendations from component vendors. In this new environment, the standard that is being applied at the San Onofre nuclear generating station (SONGS) is that the preventive maintenance program must meet the test of cost-effectiveness, improve equipment performance, support increased plant availability, and (a) literally implement the recommendations of the vendor, (b) provide other compensation for the vendor recommendation, or (c) provide technical justification for the deviation. The subject of this paper is the way that reliability-centered maintenance (RCM) is helping SONGS meet these challenges

  5. Status of maintenance in the US nuclear power industry 1985. Volume 2. Description of programs and practices

    International Nuclear Information System (INIS)

    1986-06-01

    This report documents a review of the status of maintenance programs and practices in the US commercial nuclear power industry. The purpose of this review is to establish a baselines reference for evaluating the effectiveness of future industry activities in maintenance. Two methods used to collect progammatic data. First, a Maintenance Review Protocol was used during site visits to eight selected power plants to collect in-depth maintenance program information. Second, a Maintenance Questionnaire was filled out by NRC Resident Inspectors regarding maintenance programs at their plant. The protocol and questionnaire contained items regarding five broad categories of maintenance: (1) organization and administration, (2) facilities and equipment, (3) procedures, (4) personnel, and (5) work control. The study found that there is wide variability in industry maintenance programs. However, the industry is currently undergoing changes in maintenance practices, and adherence to INPO and NUMARC guidance in maintenance may bring about more systematically developed program practices

  6. Standards for maintenance documentation of COSMOS programs

    International Nuclear Information System (INIS)

    Burstall, R.F.; Rickets, T.M.; Butland, A.T.D.

    1982-06-01

    The Compatible Open Shop Modular Operating Scheme (COSMOS) is used for fast reactor neutronics and subassembly distortion calculations in the UK. It provides database and databank facilities for this purpose. A large number of applications programs use these facilities. This report sets down the standards agreed for use in the preparation of maintenance documents for these programs. These standards have been developed as the result of experience with earlier more complicated standards. Some of the terminology used in this report is particular to COSMOS, but the general features of the standard may be useful to those responsible for other computer programs. (author)

  7. A Compromise Programming Model for Highway Maintenance Resources Allocation Problem

    Directory of Open Access Journals (Sweden)

    Hui Xiong

    2012-01-01

    Full Text Available This paper formulates a bilevel compromise programming model for allocating resources between pavement and bridge deck maintenances. The first level of the model aims to solve the resource allocation problems for pavement management and bridge deck maintenance, without considering resource sharing between them. At the second level, the model uses the results from the first step as an input and generates the final solution to the resource-sharing problem. To solve the model, the paper applies genetic algorithms to search for the optimal solution. We use a combination of two digits to represent different maintenance types. Results of numerical examples show that the conditions of both pavements and bridge decks are improved significantly by applying compromise programming, rather than conventional methods. Resources are also utilized more efficiently when the proposed method is applied.

  8. An optimal maintenance policy for machine replacement problem using dynamic programming

    OpenAIRE

    Mohsen Sadegh Amalnik; Morteza Pourgharibshahi

    2017-01-01

    In this article, we present an acceptance sampling plan for machine replacement problem based on the backward dynamic programming model. Discount dynamic programming is used to solve a two-state machine replacement problem. We plan to design a model for maintenance by consid-ering the quality of the item produced. The purpose of the proposed model is to determine the optimal threshold policy for maintenance in a finite time horizon. We create a decision tree based on a sequential sampling inc...

  9. HIV drug resistance early warning indicators in cohorts of individuals starting antiretroviral therapy between 2004 and 2009: World Health Organization global report from 50 countries.

    Science.gov (United States)

    Bennett, Diane E; Jordan, Michael R; Bertagnolio, Silvia; Hong, Steven Y; Ravasi, Giovanni; McMahon, James H; Saadani, Ahmed; Kelley, Karen F

    2012-05-01

    The World Health Organization developed a set of human immunodeficiency virus drug resistance (HIVDR) early warning indicators (EWIs) to assess antiretroviral therapy clinic and program factors associated with HIVDR. EWIs are monitored by abstracting data routinely recorded in clinical records, and the results enable clinics and program managers to identify problems that should be addressed to minimize preventable emergence of HIVDR in clinic populations. As of June 2011, 50 countries monitored EWIs, covering 131 686 patients initiating antiretroviral treatment between 2004 and 2009 at 2107 clinics. HIVDR prevention is associated with patient care (appropriate prescribing and patient monitoring), patient behavior (adherence), and clinic/program management efforts to reduce treatment interruptions (follow up, retention on first-line ART, procurement and supply management of antiretroviral drugs). EWIs measure these factors and the results have been used to optimize patient and population treatment outcomes.

  10. Optimizing preventive maintenance with maintenance templates

    International Nuclear Information System (INIS)

    Dozier, I.J.

    1996-01-01

    Rising operating costs has caused maintenance professionals to rethink their strategy for preventive maintenance (PM) programs. Maintenance Templates are pre-engineered PM task recommendations for a component type based on application of the component. Development of the maintenance template considers the dominant failure cause of the component and the type of preventive maintenance that can predict or prevent the failure from occurring. Maintenance template development also attempts to replace fixed frequency tasks with condition monitoring tasks such as vibration analysis or thermography. For those components that have fixed frequency PM intervals, consideration is given to the maintenance drivers such as criticality, environment and usage. This helps to maximize the PM frequency intervals and maximize the component availability. Maintenance Templates have been used at PECO Energy's Limerick Generating Station during the Reliability Centered Maintenance (RCM) Process to optimize their PM program. This paper describes the development and uses of the maintenance templates

  11. An evaluation of the Browns Ferry Nuclear Plant preventive maintenance program based on reliability centered maintenance analysis

    International Nuclear Information System (INIS)

    McCullough, C.L.; McCullough, C.A.

    1989-01-01

    Reliability centered maintenance (RCM) techniques were used to support a preventative maintenance (PM) upgrade program (PMUP) performed at TVA Browns Ferry Nuclear Plant (BFNP). The purpose of the RCM analysis was to identify critical equipment based on risk and economic importance and to evaluate the PM activities applicable to that equipment. The analysis may be conveniently divided into three steps, which will be outlined in the Approach section of this paper. The net benefit of the RCM approach was a prioritization of the focus of the PM upgrade program so that plant components receive attention proportional to their importance, and assurance that PM activities properly address the most likely component failure causes

  12. Adherence to a maintenance exercise program 1 year after pulmonary rehabilitation: what are the predictors of dropout?

    Science.gov (United States)

    Heerema-Poelman, Ankie; Stuive, Ilse; Wempe, Johan B

    2013-01-01

    To evaluate adherence to a maintenance exercise program in patients with chronic obstructive pulmonary disease (COPD) and explore predictors for adherence. Seventy patients with COPD were referred to a home-care maintenance exercise program after completing pulmonary rehabilitation (PR) in the rehabilitation center. Adherence (yes/no) to the maintenance program was assessed by a self-reported questionnaire, where adherence was defined as attending the maintenance program 1 year after PR. Early dropouts received a self-reported questionnaire after 6 months and the remaining patients after 12 months. Lung function, exercise capacity, exercise self-efficacy, illness perceptions, health-related quality of life, levels of anxiety and depression, duration of PR, and the number of exacerbations were studied as possible predictors of adherence. Ten patients died or were lost to followup. Of the remaining 60 patients, 73.3% and 63.3% were adherent to the maintenance exercise program after 6 and 12 months, respectively. Forced expiratory volume in 1 second (FEV1) (P = .021), Hospital Anxiety and Depression Scale depression score (P = .025), and duration of PR (P = .018) were significant predictors of adherence to the maintenance program. Adherence to the maintenance exercise program included a 36.7% drop-out rate during the first year after completing PR. Experiencing exacerbations was the most reported reason for dropout. Poorer lung function, shorter initial PR course measured by reviewing patient records, and higher level of depressive symptoms were predictive of drop-out to the maintenance program. Adherence to the maintenance program needs to be improved for patients with lower FEV1, with signs of depression, or with a shorter initial PR course.

  13. 25 CFR 170.808 - Can BIA Road Maintenance Program funds be used to improve IRR transportation facilities?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Can BIA Road Maintenance Program funds be used to improve... THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.808 Can BIA Road Maintenance Program funds be used to improve IRR transportation facilities? No. BIA Road...

  14. Guide for monitoring effectiveness of utility Reliability Centered Maintenance (RCM) programs

    International Nuclear Information System (INIS)

    Midgett, W.D.; Wilson, J.F.; Krochmal, D.F.; Owsenek, L.W.

    1991-02-01

    Reliability centered maintenance (RCM) programs help utilities optimize preventive maintenance efforts while improving plant safety and economy through increased dependability of plant components. The project team developed this guide and accompanying methodology based on status updates from the Ginna and San Onofre demonstration projects. These updates addressed areas ranging from system selection to the effectiveness of RCM program implementation. In addition, the team incorporated information from a 12-utility survey soliciting opinions on the need for a methodology to monitor RCM cost-effectiveness. An analysis of the 12-utility survey showed that no techniques had been developed to measure RCM program cost-effectiveness. Thus, this guide addresses two key areas: Pros and cons of various monitoring techniques available to assess the overall effectiveness of RCM and a methodology for specifically evaluating the cost-effectiveness of RCM programs. 1 fig

  15. Improving maintenance of lost weight following a commercial liquid meal replacement program: a preliminary study.

    Science.gov (United States)

    Ames, Gretchen E; Patel, Roshni H; McMullen, Jillian S; Thomas, Colleen S; Crook, Julia E; Lynch, Scott A; Lutes, Lesley D

    2014-01-01

    Clinic-based liquid meal replacement (800kcals/day) programs produce substantial weight loss. Nevertheless, long-term maintenance remains a challenge. A limitation of maintenance programs is that they continue to promote large behavior changes that are initially required to induce weight loss which may be unsustainable long-term. The study aims were to conduct a preliminary assessment of the feasibility, acceptability, and effectiveness of a small changes maintenance intervention (SCM) for 30 patients who completed liquid meal replacement program (LMR). The 20-session SCM delivered over 52 weeks offered no preset goals for maintenance behaviors and all changes in behavior were self-selected. Participants had a median BMI of 40.9 kg/m(2) and weight of 111 kg at the start of LMR. At LMR completion, they lost 18% (21 kg) of body weight. The SCM was completed by 22 patients (73%); 19 completers (86%) attended ≥ 17 of 20 sessions with a median satisfaction rating of 9 (on a scale of 1 to 9). Completers were asked to record self-selected maintenance behaviors daily (median 351 days recorded). The most commonly reported daily behaviors were self-weighing, use of meal replacements and step counting. Median percent regain at week 52 was 14% (2.8 kg) of lost weight (range, -42 to 74%), significantly less than a median of 56% (11 kg) percent regain of lost weight (range, -78 to 110%) in a demographically similar historical control group with no maintenance intervention after LMR completion (P<0.001). Thus, SCM holds promise for improving weight maintenance. Future research should compare SCM to standard maintenance programs that promote large program-directed changes. © 2013.

  16. Fuzzy Goal Programming Approach in Selective Maintenance Reliability Model

    Directory of Open Access Journals (Sweden)

    Neha Gupta

    2013-12-01

    Full Text Available 800x600 In the present paper, we have considered the allocation problem of repairable components for a parallel-series system as a multi-objective optimization problem and have discussed two different models. In first model the reliability of subsystems are considered as different objectives. In second model the cost and time spent on repairing the components are considered as two different objectives. These two models is formulated as multi-objective Nonlinear Programming Problem (MONLPP and a Fuzzy goal programming method is used to work out the compromise allocation in multi-objective selective maintenance reliability model in which we define the membership functions of each objective function and then transform membership functions into equivalent linear membership functions by first order Taylor series and finally by forming a fuzzy goal programming model obtain a desired compromise allocation of maintenance components. A numerical example is also worked out to illustrate the computational details of the method.  Normal 0 false false false EN-US X-NONE X-NONE MicrosoftInternetExplorer4

  17. Canada's MMP (Maintenance Management Professional) education and certification program

    International Nuclear Information System (INIS)

    Clegg, N.; Rae, V.

    2010-01-01

    'Full text:' Plant Engineering and Maintenance Association of Canada (PEMAC) is a national not-for-profit association providing global leadership, education and certification in world class maintenance, reliability and physical asset management practices. This presentation will introduce the MMP (Maintenance Management Professional) education and certification program and its 8 Modules. You will see the learning elements and learning outcomes of each of the 8 Modules which are delivered through selected colleges, institutes and universities across Canada using in-class, on-site and live, on-line formats in both official languages. (author)

  18. Advancements in nuclear plant maintenance programs

    International Nuclear Information System (INIS)

    Meligi, A.E.; Maras, M.C.

    1993-01-01

    The viability of the nuclear option as a technology choice for present and future electricity generation will be decided primarily on the basis of operating cost to achieve plant performance objectives. In a nuclear plant, performance is judged not only on availability and output rate but also on safety risk and radiation exposure. Operating, cost is essentially made up of the fuel cost and operation and maintenance (O and M) cost. Over the past decade, the industry average nuclear plant performance has improved significantly; however, this improvement was accompanied by rising O and M cost. The net result was that the nuclear option lost its long-standing economic advantage over the coal option, based on the industry average comparison, around 1987 - with the gap narrowing slightly in the last 2 years. In recent times, gas-fired plants have also become a basis for comparison. The electric generation cost comparisons of various fuel options has led to even greater scrutiny of nuclear plant performance, with the poorer performing plants facing the risk of shutdown. While effective O and M programs improve plant performance, present industry data show that there is no direct correlation between the cost of a plant O and M program and its associated performance. There is a significant number of existing tools and techniques in the O and M area that have proved to be successful and have resulted in significant benefits and payback. This paper presents an overview of the nuclear industry efforts to improve the conduct of O and M activities, describes the basic elements of an effective O and M program, and addresses some of the state-of-the-art tools and techniques to enhance maintenance work planning, training, and procedures

  19. Planning factors for developing an enterprise-wide picture archiving and communication system maintenance program.

    Science.gov (United States)

    Staley, S; Romlein, J; Chacko, A K; Wider, R

    2000-05-01

    Picture archiving and communication system (PACS) maintenance on an individual site basis has historically been a complex and costly challenge. With the advent of enterprise-wide PACS projects such as the Virtual Radiology Environment (VRE) project, the challenge of a maintenance program with even more complexities has presented itself. The approach of the project management team for the VRE project is not one of reactive maintenance, but one of highly proactive planning and negotiations, in hopes of capitalizing on the economies of scale of an enterprise-wide PACS maintenance program. A proactive maintenance program is one aspect of life-cycle management. As with any capital acquisition, life-cycle management may be used to manage the specific project aspects related to PACS. The purpose of an enterprise-wide warranty and maintenance life-cycle management approach is to maintain PACS at its maximum operational efficiency and utilization levels through a flexible, shared, yet symbiotic relationship between local, regional, and vendor resources. These goals include providing maximum operational performance levels on a local, regional, and enterprise basis, while maintaining acceptable costs and resource utilization levels. This goal must be achieved without negatively impacting point of care activities, regardless of changes to the clinical business environment.

  20. European wind integration study (EWIS). Towards a successful integration of large scale wind power into European electricity grids. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Winter, W.

    2010-03-15

    Large capacities of wind generators have already been installed and are operating in Germany (26GW) and Spain (16GW). Installations which are as significant in terms of proportion to system size are also established in Denmark (3.3GW), the All Island Power System of Ireland and Northern Ireland (1.5GW), and Portugal (3.4GW). Many other countries expect significant growth in wind generation such that the total currently installed capacity in Europe of 68GW is expected to at least double by 2015. Yet further increases can be expected in order to achieve Europe's 2020 targets for renewable energy. The scale of this development poses big challenges for wind generation developers in terms of obtaining suitable sites, delivering large construction projects, and financing the associated investments from their operations. Such developments also impact the networks and it was to address the immediate transmission related challenges that the European Wind Integration Study (EWIS) was initiated by Transmission System Operators (TSOs) with the objective of ensuring the most effective integration of large scale wind generation into Europe's transmission networks and electricity system. The challenges anticipated and addressed include: 1) How to efficiently accommodate wind generation when markets and transmission access arrangements have evolved for the needs of traditional controllable generation. 2) How to ensure supplies remain secure as wind varies (establishing the required backup/reserves for low wind days and wind forecast errors as well as managing network congestion in windy conditions). 3) How to maintain the quality and reliability of supplies given the new generation characteristics. 4) How to achieve efficient network costs by suitable design and operation of network connections, the deeper infrastructure including offshore connections, and crossborder interconnections. EWIS has focused on the immediate network related challenges by analysing detailed

  1. "Business Continuity and Information Security Maintenance" Masters’ Training Program

    OpenAIRE

    Miloslavskaya , Natalia; Senatorov , Mikhail; Tolstoy , Alexandr; Zapechnikov , Sergei

    2013-01-01

    Part 1: WISE 8; International audience; The experience of preparing for the "Business Continuity and Information Security Maintenance" (BC&ISM) Masters’ program implementation and realization at the "Information Security of Banking Systems" Department of the National Research Nuclear University MEPhI (NRNU MEPhI, Moscow, Russia) is presented. Justification of the educational direction choice for BC&ISM professionals is given. The model of IS Master being trained on this program is described. ...

  2. The right maintenance on the right components, at the right time, with the right parts: maintaining high plant reliability through an effective maintenance program

    International Nuclear Information System (INIS)

    Von Hatten, P.

    2008-01-01

    The objective of the maintenance program at a Nuclear Power Plant is to be proactive and prevent unexpected failures of equipment that can impact on Nuclear or Conventional Safety and Plant Production. This does not mean that all equipment failures will be prevented; in a number of cases the most cost effective solution is to allow equipment to run to failure. Deciding what components are critical to the plant is the first step. The industry uses guidance from INPO Advanced Process, AP913, to classify components as Critical, Non Critical or Run to Failure based on the consequence of the failure. Once this is complete, then the right maintenance program needs to be specified. This is done through utilization of experience from the industry based on the type of component. Maintenance strategies and templates have been produced for most power plant components. Each station or fleet needs then to apply the criteria, with exceptions as required, to determine the maintenance requirements and frequency for their components. This includes predictive and preventative maintenance. The more critical the component is the more rigorous the maintenance requirements. Once the maintenance program is defined it can be implemented. This requires that the Preventative Maintenance (PM's) are updated to ensure the correct tasks are in place and the frequency is correct. Work Management will group the PM's so they can scheduled efficiently and to minimize equipment down time. The last element is to ensure that the required parts are specified and are stocked or readily available for the maintenance when it is scheduled. This is an ongoing effort since components become obsolete or suppliers go out of business or change hands. (author)

  3. Program plan for future regulatory activity in nuclear-power-plant maintenance

    International Nuclear Information System (INIS)

    Badalamente, R.V.

    1982-10-01

    The intent of this paper is to describe the results of a study of nuclear power plant (NPP) maintenance conducted by Battelle's Pacific Northwest Laboratories (PNL) for the Nuclear Regulatory Commission (NRC). The purpose of the study for the NRC was to determine problems affecting human performance in NPP maintenance, pinpoint those which adversely affect public health and safety, review strategies for overcoming the problems, and suggest the direction that regulatory activities should take. Results of the study were presented to the NRC (Division of Human Factors Safety) in the form of a recommended program plan for future regulatory activity in NPP maintenance

  4. ORNL Surplus Facilities Management Program maintenance and surveillance plan for fiscal year 1984

    International Nuclear Information System (INIS)

    Coobs, J.H.; Myrick, T.E.

    1986-10-01

    The Surplus Facilities Management Program (SFMP) at Oak Ridge National Laboratory (ORNL) is part of the Department of Energy's (DOE) National SFMP, administered by the Richland Operations Office. The purpose and objectives of the national program are set forth in the current SFMP Program Plan and include (1) the maintenance and surveillance of facilities awaiting decommissioning, (2) planning for the orderly decommissioning of these facilities, and (3) implementation of a program to accomplish the facility disposition in a safe, cost-effective, and timely manner. As outlined in the national program plan, participating SFMP contractors are required to prepare a formal plan that documents the maintenance and surveillance (M and S) programs established for each site. This report has been prepared to provide this documentation for those facilties included in the ORNL SFMP

  5. 25 CFR Appendix A to Subpart G - List of Activities Eligible for Funding Under BIA Transportation Facility Maintenance Program

    Science.gov (United States)

    2010-04-01

    ... Transportation Facility Maintenance Program A Appendix A to Subpart G Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance Pt. 170... Transportation Facility Maintenance Program The following activities are eligible for BIA Transportation Facility...

  6. Implementing a customer focused continual business improvement program to improve the maintenance process

    International Nuclear Information System (INIS)

    Kharshafdjian, G.; Fisher, C.; Beres, T.; Brooks, S.; Forbes, S.; Krause, M.; McAuley, K.; Wendorf, M.

    2006-01-01

    Global market pressures and increasing competition demands that successful companies establish a continual business improvement program as part of implementing its business strategy. Such programs must be driven by the definition of quality from the customer's perspective. This customer quality focus often requires a change in all aspects of the business including products, services, processes and culture. This paper will describe how Atomic Energy of Canada Limited implemented a Continual Business Improvement Program in their Nuclear Laboratories Business Unit. In particular, to review how the techniques were applied to improve the maintenance process and the status of the project. Customer (internal users of the processes at CRL) feedback has shown repeatedly there is dissatisfaction of the maintenance process. Customers complain about jobs not getting done to schedule or being deferred. A project has been launched with the following goals: to improve the maintenance process customer satisfaction and increase trades wrench time by 30 minutes / trade / day. DMAIC (Define-Measure-Analyze-Improve-Control) methodology was applied to find out the Root Cause(s) of the problem, provide solutions, and implement improvements. The expected Operational Benefits include: Executing work efficiently to quality standards and business performance of the site, improve maintenance efficiencies, reduce cycle time for maintenance process and improve process yield, and improve customer and employee satisfaction. (author)

  7. Implementing a customer focused continual business improvement program to improve the maintenance process

    Energy Technology Data Exchange (ETDEWEB)

    Kharshafdjian, G.; Fisher, C.; Beres, T.; Brooks, S.; Forbes, S.; Krause, M.; McAuley, K.; Wendorf, M. [Atomic Energy of Canada Limited, Chalk River, Ontario (Canada)

    2006-07-01

    Global market pressures and increasing competition demands that successful companies establish a continual business improvement program as part of implementing its business strategy. Such programs must be driven by the definition of quality from the customer's perspective. This customer quality focus often requires a change in all aspects of the business including products, services, processes and culture. This paper will describe how Atomic Energy of Canada Limited implemented a Continual Business Improvement Program in their Nuclear Laboratories Business Unit. In particular, to review how the techniques were applied to improve the maintenance process and the status of the project. Customer (internal users of the processes at CRL) feedback has shown repeatedly there is dissatisfaction of the maintenance process. Customers complain about jobs not getting done to schedule or being deferred. A project has been launched with the following goals: to improve the maintenance process customer satisfaction and increase trades wrench time by 30 minutes / trade / day. DMAIC (Define-Measure-Analyze-Improve-Control) methodology was applied to find out the Root Cause(s) of the problem, provide solutions, and implement improvements. The expected Operational Benefits include: Executing work efficiently to quality standards and business performance of the site, improve maintenance efficiencies, reduce cycle time for maintenance process and improve process yield, and improve customer and employee satisfaction. (author)

  8. Integrated predictive maintenance program vibration and lube oil analysis: Part I - history and the vibration program

    Energy Technology Data Exchange (ETDEWEB)

    Maxwell, H.

    1996-12-01

    This paper is the first of two papers which describe the Predictive Maintenance Program for rotating machines at the Palo Verde Nuclear Generating Station. The organization has recently been restructured and significant benefits have been realized by the interaction, or {open_quotes}synergy{close_quotes} between the Vibration Program and the Lube Oil Analysis Program. This paper starts with the oldest part of the program - the Vibration Program and discusses the evolution of the program to its current state. The {open_quotes}Vibration{close_quotes} view of the combined program is then presented.

  9. Integrated predictive maintenance program vibration and lube oil analysis: Part I - history and the vibration program

    International Nuclear Information System (INIS)

    Maxwell, H.

    1996-01-01

    This paper is the first of two papers which describe the Predictive Maintenance Program for rotating machines at the Palo Verde Nuclear Generating Station. The organization has recently been restructured and significant benefits have been realized by the interaction, or open-quotes synergyclose quotes between the Vibration Program and the Lube Oil Analysis Program. This paper starts with the oldest part of the program - the Vibration Program and discusses the evolution of the program to its current state. The open-quotes Vibrationclose quotes view of the combined program is then presented

  10. Standard Review Plan Maintenance Program implementing procedures document

    International Nuclear Information System (INIS)

    1996-11-01

    The implementing Procedures Document (IPD) was developed by the Inspection Program Projects Branch, Office of Nuclear Reactor Regulation, with assistance from Pacific Northwest National Laboratory, for the Standard Review Plan Maintenance Program (SRP-MP). The SRP-MP was established to maintain the Standard Review Plan (SRP) on an on-going basis. The IPD provides guidance, including an overall approach and procedures, for SRP-MP tasks. The objective of the IPD is to ensure that modifications to SRP need to reflect current NRC requirements and guidance are identified and that a consistent methodology is used to develop and revise SRP sections

  11. Research Devices Maintenance Programs and Safety Network Infrastructures in Nuclear Malaysia

    International Nuclear Information System (INIS)

    Zainudin Jaafar; Muhammad Zahidee Taat; Ishak Mansor

    2015-01-01

    Instrumentation and Automation Center (PIA) is responsible in carrying out maintenance work for building safety infrastructure and area for nuclear scientific and research work. Care cycle and nuclear scientific tools starting from the preparation of specifications until devices disposal- to get the maximum output from devices therefore PIA has introduced Effective and Comprehensive Maintenance Plan under Management/ Trust/ Development/ Science Fund budgets and also user, Asset Management, caring and handling of the devices. This paper also discussed more on case study related to using and handling so that it can be guidance and standard when its involving mishandling, improper maintenance, inadequacy of supervision and others including improvement suggestion programs. (author)

  12. The Nordic Maintenance Care Program – An interview study on the use of maintenance care in a selected group of Danish chiropractors

    Directory of Open Access Journals (Sweden)

    Leboeuf-Yde Charlotte

    2009-06-01

    Full Text Available Abstract Background Although maintenance care appears to be relatively commonly used among chiropractors, the indications for its use are incompletely understood. A questionnaire survey was recently carried out among Swedish chiropractors in order to identify their choice of various management strategies, including maintenance care. That study revealed a common pattern of choice of strategies. However, it would be necessary to verify these findings in another study population and to obtain some additional information best collected through an interview. Objectives The main aim of the present study was to attempt to reproduce the findings in the Swedish study and to obtain more information on the use of maintenance care. Method A group of 11 chiropractors were selected because they used maintenance care. They were interviewed using the questionnaire from the previous Swedish survey. The questionnaire consisted of a simple description of a hypothetical patient with low back pain and nine possible ways in which the case could develop ("scenarios". They could choose between six different management strategies for each scenario. In addition, the chiropractors were encouraged to provide their own definition of maintenance care in an open-ended question. Interviews were taped, transcribed and analyzed. For the open-ended question, statements were identified relating to six pre hoc defined topics on the inclusion criteria/rationale for maintenance care, the frequency of treatments, and the duration of the maintenance care program. Results The open-ended question revealed that in patients with low back pain, maintenance care appears to be offered to prevent new events. The rationale was to obtain optimal spinal function. There appears to be no common convention on the frequency of treatments and duration of the treatment program was not mentioned by any of the interviewees. Conclusion The results from the questionnaire in the Danish survey showed that

  13. Surveying the elements of successful infrared predictive maintenance programs

    Science.gov (United States)

    Snell, John R., Jr.; Spring, Robert W.

    1991-03-01

    This paper summarizes the results of a survey of over three hundred maintenance personnel who use imaging equipment within their company or organization. All had previously participated in one or more of our training programs. The companies took in a broad range of industry, including, among other, power generation, pulp and paper, metals, mining, petrochemical, automotive and general manufacturing. The organizations were mainly quite large, either commercial or public, and included governmental agencies, military, colleges and universities, municipalities, and utilities. Although we had a very tight time line for the survey, we were pleased to have a 15% response rate. The results show that some of the causes of success and failure in infrared programs are not unlike those associated with any type of program in an organizational structure, i.e. the need for accurate and timely communications; justification requirements; etc. Another set of problems was shared more closely with other startup maintenance technologies (for example, vibration monitoring), such as the need for trending data; providing appropriate technical training; achieving reproducible results; etc. Finally, some of the driving mechanisms are more specific to this technology, such as re-designing equipment so that it can be thermally inspected; establishing effective documentation strategies; etc.

  14. Using the system maintenance datastore to characterize lifetime maintenance for PLiM

    International Nuclear Information System (INIS)

    Watson, P.; Dam, R.; Nickerson, J.

    2004-01-01

    A comprehensive Plant Life Management (PLiM) program involves evaluating a large amount of information. For any plant, there are numerous maintenance, surveillance and inspection programs for the important systems, structures and components. There is extensive industry experience on component failure modes, degradation mechanisms and recommended maintenance practices. This information forms the basis of the aging assessment work, through which improvements to these plant programs are identified. AECL has developed several tools to manage the quantities of information required in aging assessment studies, such as the SYSTMS (SYtematic approach for the development of STrategy for Maintenance and Surveillance) tool and the System Maintenance Datastore (SMD). The SMD has been developed to serve as a hub to a Systematic based Adaptive Maintenance Program (SAMP), by storing maintenance resource requirements for recommended maintenance tasks for use by the other processes in a SAMP. The SMD can be used to (a) quantify the savings or cost of optimising a maintenance program, (b) characterize and understand long term trends in condition-based maintenance due to component aging, (c) quantify the resource savings due to optimum timing of component replacement or general plant refurbishment, and (d) provide aging assessment cost information for input to plant asset evaluation. The SMD contains data for regular maintenance program tasks, plant condition assessment recommendations, and equipment refurbishment costs. A prototype SMD has been developed with data tables populated with information from operating CANDU stations. The SMD is now available to be used either with a SYSTMS evaluation or with a plant's database of maintenance tasks. (author)

  15. Investigating the Optimal Management Strategy for a Healthcare Facility Maintenance Program

    National Research Council Canada - National Science Library

    Gaillard, Daria

    2004-01-01

    ...: strategic partnering with an equipment management firm. The objective of this study is to create a decision-model for selecting the optimal management strategy for a healthcare organization's facility maintenance program...

  16. Managed maintenance, the next step in power plant maintenance

    International Nuclear Information System (INIS)

    Butterworth, G.; Anderson, T.M.

    1984-01-01

    The Westinghouse Nuclear Services Integration Division managed maintenance services are described. Essential to the management and control of a total plant maintenance programme is the development of a comprehensive maintenance specification. During recent years Westinghouse has jointly developed total plant engineering-based maintenance specifications with a number of utilities. The process employed and the experience to date are described. To efficiently implement the maintenance programme Westinghouse has developed a computer software program specifically designed for day to day use at the power plant by maintenance personnel. This program retains an equipment maintenance history, schedules maintenance activities, issues work orders and performs a number of sophisticated analyses of the maintenance backlog and forecast, equipment failure rates, etc. The functions of this software program are described and details of Westinghouse efforts to support the utilities in reducing outage times through development of predefined outage plans for critical report maintenance activities are given. Also described is the experience gained in the training of specialized maintenance personnel, employing competency-based training techniques and equipment mock-ups, and the benefits experienced, in terms of improved quality and productivity of maintenance performed. The success experienced with these methods has caused Westinghouse to expand the use of these training techniques to the more routine skill areas of power plant maintenance. A significant reduction in the operating costs of nuclear power plants will only be brought about by a significant improvement in the quality of maintenance. Westinghouse intends to effect this change by expanding its international service capabilities and to make major investments in order to promote technological developments in the area of power plant maintenance. (author)

  17. User Delay Cost Model and Facilities Maintenance Cost Model for a Terminal Control Area : Volume 3. User's Manual and Program Documentation for the Facilities Maintenance Cost Model

    Science.gov (United States)

    1978-05-01

    The Facilities Maintenance Cost Model (FMCM) is an analytic model designed to calculate expected annual labor costs of maintenance within a given FAA maintenance sector. The model is programmed in FORTRAN IV and has been demonstrated on the CDC Krono...

  18. World-wide developments in motor vehicle inspection/maintenance (I/M) programs

    Energy Technology Data Exchange (ETDEWEB)

    Klausmeier, R. [Consulting Inc., Austin, TX (United States); Kishan, S. [Radian Corporation, Austin, TX (United States)

    1995-12-31

    Motor vehicles contribute much to urban air pollution. As a result, most governments have enacted emission standards that significantly lower pollutant emission levels from new motor vehicles. For example, vehicles built in the United States emit 95 % fewer pollutants than uncontrolled vehicles when they are new. However, studies indicate that proper maintenance is needed to obtain the full benefit of vehicle emission controls. Furthermore, there is evidence that a significant percentage of the vehicle fleet is not properly maintained. This has led to the creation of motor vehicle Inspection/Maintenance (I/M) Programs. I/M programs inspect vehicles for indications that they are emitting excessive quantities of pollutants. Vehicles that fail the inspection must be repaired in order to comply with program requirements. The first I/M programs were implemented in the United States in the early 1970s. With substantial urging from the federal government, most of the U.S. states with severe air pollution problems have implemented I/M programs. Recently, with the passage of the U.S. Clean Air Act Amendments of 1990, many states have been required to significantly upgrade the performance and coverage of their I/M programs. I/M programs also have been implemented in Europe and recently in Asia. This presentation reviews developments in I/M programs for light-duty gasoline powered vehicles. Developments in I/M programs for diesel powered vehicles are briefly described. (author)

  19. World-wide developments in motor vehicle inspection/maintenance (I/M) programs

    Energy Technology Data Exchange (ETDEWEB)

    Klausmeier, R [Consulting Inc., Austin, TX (United States); Kishan, S [Radian Corporation, Austin, TX (United States)

    1996-12-31

    Motor vehicles contribute much to urban air pollution. As a result, most governments have enacted emission standards that significantly lower pollutant emission levels from new motor vehicles. For example, vehicles built in the United States emit 95 % fewer pollutants than uncontrolled vehicles when they are new. However, studies indicate that proper maintenance is needed to obtain the full benefit of vehicle emission controls. Furthermore, there is evidence that a significant percentage of the vehicle fleet is not properly maintained. This has led to the creation of motor vehicle Inspection/Maintenance (I/M) Programs. I/M programs inspect vehicles for indications that they are emitting excessive quantities of pollutants. Vehicles that fail the inspection must be repaired in order to comply with program requirements. The first I/M programs were implemented in the United States in the early 1970s. With substantial urging from the federal government, most of the U.S. states with severe air pollution problems have implemented I/M programs. Recently, with the passage of the U.S. Clean Air Act Amendments of 1990, many states have been required to significantly upgrade the performance and coverage of their I/M programs. I/M programs also have been implemented in Europe and recently in Asia. This presentation reviews developments in I/M programs for light-duty gasoline powered vehicles. Developments in I/M programs for diesel powered vehicles are briefly described. (author)

  20. Adherence to a Maintenance Exercise Program 1 Year After Pulmonary Rehabilitation WHAT ARE THE PREDICTORS OF DROPOUT?

    NARCIS (Netherlands)

    Heerema-Poelman, Ankie; Stuive, Ilse; Wempe, Johan B.

    2013-01-01

    PURPOSE: To evaluate adherence to a maintenance exercise program in patients with chronic obstructive pulmonary disease (COPD) and explore predictors for adherence. METHODS: Seventy patients with COPD were referred to a home-care maintenance exercise program after completing pulmonary rehabilitation

  1. Development of inspection and maintenance program for reactor and reactivity control units in HANARO

    International Nuclear Information System (INIS)

    Cho, Yeong-Garp

    1998-01-01

    This paper summarizes the overall program for inspection and maintenance of reactor structure and Reactivity Control Units (RCU) of HANARO during lifetime. The long-term plan for in-service inspection is introduced in the viewpoint of the structural integrity of reactor and RCU, and the operability of RCU mechanism. This program includes the list of components to be inspected, the schedule of inspection and maintenance, and the development of special tools and test rig that are required for the remote inspection and maintenance of reactor and RCU components. Preliminary results of the evaluation on the lifetime of RCU components are summarized based on the operation history since the installation of reactor. A test rig will be designed and constructed for the purposes of verifying the prolonged lifetime of RCU components being used, the performance of special tools, and the rehearsal of maintenance work as well. (author)

  2. Development of a Preventive Maintenance Program for Tooling Used in Powder Slush Molding

    Energy Technology Data Exchange (ETDEWEB)

    Lara-Curzio, Edgar [ORNL; Rios, Orlando [ORNL; Marquez Rossy, Andres E [ORNL

    2016-07-19

    ORNL collaborated with Faurecia Interior Systems to investigate the feasibility of developing a thermomagnetic preventive maintenance program for nickel tooling used in powder slush molding. It was found that thermal treatments at temperatures greater than 500°C can anneal strain hardening in nickel tooling and a range of temperatures and times for effective thermal annealing were identified. It was also observed that magnetic fields applied during thermal annealing do not alter the kinetics of strain hardening annealing. The results obtained in this investigation provide a foundation for establishing a preventive maintenance program for nickel tooling.

  3. Preventive maintenance program for a research and production reactor

    International Nuclear Information System (INIS)

    Rico, N.A.

    1990-01-01

    This program proposes a simple, rapid and efficient methodology for the task of developing a really preventive maintenance discipline. Moreover, the lower cost of its application -since it must satisfy the plant's budget-. To this purpose, an extremely economical and easily obtainable infrastructure is proposed. The following stage is referred to the commissioning system, subsequent supervision and follow-up. The experience gained from the two reactors as RA-6 (Bariloche Atomic Center) and NUR (RAE) of Argelia. Finally, the interacting characteristic of this program, since it may be rapidly adapted to different dimensions of plants, laboratories, etc., must be pointed out. (Author) [es

  4. Code Maintenance and Design for a Visual Programming Language Graphical User Interface

    National Research Council Canada - National Science Library

    Pierson, Graham

    2004-01-01

    This work adds new functionality to an existing visual programming environment. It applies software maintenance techniques for use with the Java Language in a Microsoft Windows operating system environment...

  5. Systematic maintenance analysis with decision support method and tool for optimizing maintenance programme

    International Nuclear Information System (INIS)

    Laakso, K.; Simola, K.; Dorrepaal, J.; Skogberg, P.

    1999-01-01

    This report describes an approach to evaluate the effectiveness of test and maintenance programs of technical systems used during several years. The method combines an analysis of the historical data on faults and repairs with an analysis of the history of periodic testing and preventive maintenance action programs. The application of the maintenance analysis from the methodological point of view in the reliability centered maintenance (RCM) project for Barsebaeck nuclear power plant is described. In order to limit the analysis resources, a method for ranking of objects for maintenance analysis is needed. Preliminary suggestions for changes in maintenance action programs are based on signals from simple maintenance indicators and qualitative analysis of underlying data on failures and maintenance. To facilitate generation of maintenance indicators, and make the maintenance analysis more efficient, a powerful and suitable data treatment tool is needed for analysis of the work order history. In the final maintenance decisions, additional decision criteria must be taken into account, and thus a more formal decision analysis is often needed for decision support. (au)

  6. The Nordic maintenance care program

    DEFF Research Database (Denmark)

    Myburgh, Corrie; Brandborg-Olsen, Dorthe; Albert, Hanne

    2013-01-01

    To describe and interpret Danish Chiropractors' perspectives regarding the purpose and rationale for using MC (maintenance care), its content, course and patient characteristics.......To describe and interpret Danish Chiropractors' perspectives regarding the purpose and rationale for using MC (maintenance care), its content, course and patient characteristics....

  7. Long-Term Body Weight Maintenance among StrongWomen–Healthy Hearts Program Participants

    Directory of Open Access Journals (Sweden)

    Rebecca A. Seguin

    2017-01-01

    Full Text Available Background. The repeated loss and regain of body weight, referred to as weight cycling, may be associated with negative health complications. Given today’s obesity epidemic and related interventions to address obesity, it is increasingly important to understand contexts and factors associated with weight loss maintenance. This study examined BMI among individuals who had previously participated in a 12-week, evidence-based, nationally disseminated nutrition and physical activity program designed for overweight and obese middle-aged and older women. Methods. Data were collected using follow-up surveys. Complete height and weight data were available for baseline, 12-week program completion (post-program and follow-up (approximately 3 years later for 154 women (response rate = 27.5%; BMI characteristics did not differ between responders and nonresponders. Results. Mean BMI decreased significantly from baseline to post-program (−0.5, P<0.001 and post-program to follow-up (−0.7, P<0.001. Seventy-five percent of survey respondents maintained or decreased BMI post-program to follow-up. Self-efficacy and social support for healthy eating behaviors (but not physical activity were associated with BMI maintenance or additional weight loss. Conclusions. These findings support the durability of weight loss following participation in a relatively short-term intervention.

  8. 49 CFR 180.416 - Discharge system inspection and maintenance program for cargo tanks transporting liquefied...

    Science.gov (United States)

    2010-10-01

    ... section. (v) Stainless steel flexible connectors with damaged reinforcement braid. (vi) Internal self... program for cargo tanks transporting liquefied compressed gases. 180.416 Section 180.416 Transportation... PACKAGINGS Qualification and Maintenance of Cargo Tanks § 180.416 Discharge system inspection and maintenance...

  9. Community Building Services Training Program: A Model Training Program to Provide Technical Training for Minority Adults in Construction, Building Maintenance,and Property Management. Final Report.

    Science.gov (United States)

    Community Building Maintenance Corp., Chicago, IL.

    A demonstration program, administered by a community based building maintenance, management, and construction corporation, was developed to provide technical training for minority adults in construction, building maintenance, and property management in the Chicago area. The program was concerned with seeking solutions to the lack of housing, job…

  10. An optimal maintenance policy for machine replacement problem using dynamic programming

    Directory of Open Access Journals (Sweden)

    Mohsen Sadegh Amalnik

    2017-06-01

    Full Text Available In this article, we present an acceptance sampling plan for machine replacement problem based on the backward dynamic programming model. Discount dynamic programming is used to solve a two-state machine replacement problem. We plan to design a model for maintenance by consid-ering the quality of the item produced. The purpose of the proposed model is to determine the optimal threshold policy for maintenance in a finite time horizon. We create a decision tree based on a sequential sampling including renew, repair and do nothing and wish to achieve an optimal threshold for making decisions including renew, repair and continue the production in order to minimize the expected cost. Results show that the optimal policy is sensitive to the data, for the probability of defective machines and parameters defined in the model. This can be clearly demonstrated by a sensitivity analysis technique.

  11. EVALUATION OF THE IMPLEMENTATION OF OPERATIONS AND MAINTENANCE PROGRAMS IN NEW JERSEY SCHOOLS

    Science.gov (United States)

    The Asbestos Hazard Emergency Response Act (AHERA) required all schools to develop and implement an asbestos management plan (AMP). The key component of the AMP is the operations and maintenance (O&M) program. A study was conducted to evaluate the implementation of O&M programs a...

  12. Maintenance planning and performance software for valve packing programs at nuclear power stations (ValvePro Version 2.5)

    International Nuclear Information System (INIS)

    Hutcheson, N.D.

    1994-01-01

    ValvePro Version 2.5 for Windows was developed to help power plant maintenance personnel improve maintenance productivity and quality through a simple, attractive software program, which can be installed on personal computer systems in use at many utilities today. This paper explains the functions of this software and how it can be used by a maintenance organization as a foundation for a consistent, effective valve packing program utilizing sound packing principles

  13. Hotline Allegations Involving Contracts for Programmed Depot Maintenance of KC-135 Aircraft

    National Research Council Canada - National Science Library

    1998-01-01

    Introduction. We performed the audit in response to 15 allegations made to the Defense Hotline involving two contracts on the Programmed Depot Maintenance of the KC-135 Aircraft, which Oklahoma City Air logistics...

  14. Building Maintenance, Management, and Budgeting.

    Science.gov (United States)

    Pawsey, M. R.

    1982-01-01

    Australian methods and formulas for funding building maintenance and management are outlined and found to be haphazard. Discussed are: ultimate costs of deferred maintenance, major plant replacements, life cycle costing, types of maintenance programs (including full preventive maintenance), use of computer programs for planning, and organization…

  15. Predictors of Weight Loss Maintenance following an Insurance-Sponsored Weight Management Program

    OpenAIRE

    Christiaan G. Abildso; Olivier Schmid; Megan Byrd; Sam Zizzi; Alessandro Quartiroli; Sean J. Fitzpatrick

    2014-01-01

    Intentional weight loss among overweight and obese adults (body mass index ≥ 25 kg/m2) is associated with numerous health benefits, but weight loss maintenance (WLM) following participation in weight management programming has proven to be elusive. Many individuals attempting to lose weight join formal programs, especially women, but these programs vary widely in focus, as do postprogram weight regain results. We surveyed 2,106 former participants in a community-based, insurance-sponsored wei...

  16. Managing NASA's International Space Station Logistics and Maintenance program

    Science.gov (United States)

    Butina, Anthony J.

    2001-02-01

    The International Space Station will be a permanently manned orbiting vehicle that has no landing gear, no international borders, and no organizational lines-it is one Station that must be supported by one crew, 24 hours a day, 7 days a week, 365 days a year. It flies partially assembled for a number of years before it is finally complete in April of 2006. Space logistics is a new concept that will have wide reaching consequences for both space travel and life on Earth. What is it like to do something that no one has done before? What challenges do you face? What kind of organization do you put together to perform this type of task? How do you optimize your resources to procure what you need? How do you change a paradigm within a space agency? How do you coordinate and manage a one of a kind system with approximately 5,700 Orbital Replaceable Units (ORUs)? How do you plan for preventive and corrective maintenance, when you need to procure spare parts which number into the hundreds of thousands, from 127 major US vendors and 70 major international vendors? How do you transport large sections of ISS hardware around the country? These are some of the topics discussed in this paper. From conception to operation, the ISS requires a unique approach in all aspects of development and operation. Today the dream is coming true; hardware is flying and hardware is failing. The system has been put into place to support the Station and only time will tell if we did it right. This paper discusses some of the experiences of the author after working 12 years on the International Space Station's integrated logistics & maintenance program. From his early days as a contractor supportability engineer and manager, to the NASA manager responsible for the entire ISS Logistics and Maintenance program. .

  17. Effects of a 14-month low-cost maintenance training program in patients with chronic systolic heart failure

    DEFF Research Database (Denmark)

    Prescott, Eva; Hjardem-Hansen, Rasmus; Ørkild, Bodil

    2009-01-01

    Exercise training is known to be beneficial in chronic heart failure (CHF) patients but there is a lack of studies following patient groups for longer duration with maintenance training programs to defer deconditioning.......Exercise training is known to be beneficial in chronic heart failure (CHF) patients but there is a lack of studies following patient groups for longer duration with maintenance training programs to defer deconditioning....

  18. Results of calendar year 1995 Well Inspection and Maintenance Program Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    McMaster, B.W.

    1996-07-01

    This document is a compendium of results of the 1995 Monitor Well Inspection and Maintenance Program at the US Department of Energy's Oak Ridge Y-12 Plant. This report documents the work relating to well inspections and maintenance requests. Inspections are implemented in order to better assess the condition and maintenance needs of wells that are actively being monitored. Currently this approach calls for inspecting all wells on a routine (annual or triennial) basis which are: (1) in an active sampling program; (2) included in a hydrologic study; or (3) not in service, but not scheduled for plugging and abandonment. Routine inspections help to ensure that representative groundwater samples and hydrologic data are being collected, and contribute to the effective longevity of each well. This report formally presents well inspection and maintenance activities that were conducted at the Y-12 Plant from August through December 1995

  19. Two fuzzy possibilistic bi-objective zero-one programming models for outsourcing the equipment maintenance problem

    Science.gov (United States)

    Vahdani, Behnam; Jolai, Fariborz; Tavakkoli-Moghaddam, Reza; Meysam Mousavi, S.

    2012-07-01

    Maintenance outsourcing can be regarded as a strategic weapon to increase productivity and customer satisfaction in many companies, and this critical activity can be performed in a more efficient and effective way. This article presents two novel fuzzy possibilistic bi-objective zero-one programming (FPBOZOP) models for outsourcing of the equipment maintenance. In these models, cost parameters, including outsourcing cost, risk cost, time operations for performing the equipment maintenance and reliability level, as well as other influential parameters are considered through the outsourcing process. Moreover, the presented models can measure the capability of the company in doing different activities, unlike previous studies, in order to see the possibility of maintenance in-house, and can lead to make a best decision on the basis of the models' results. Both models are developed under uncertainty, which bring top managers the possibility of assigning more than one equipment or project to the supplier so that the profit is maximized, and the cost is minimized by considering bi-objectives concurrently. Then, a new fuzzy mathematical programming based possibilistic approach is introduced as a solution methodology from the recent literature to solve the proposed bi-objective zero-one programming (BOZOP) models and to reach a preferred compromise solution. Furthermore, a real-case study is utilized to demonstrate and to validate the effectiveness of the presented models. The computational results revealed that the models can be implemented in variety of problems in the domain of the equipment maintenance outsourcing and project outsourcing either from theory or application perspectives.

  20. Y-12 Groundwater Protection Program CY2012 Triennial Report Of The Monitoring Well Inspection And Maintenance Program Y-12 National Security Complex, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-09-01

    This document is the triennial report for the Well Inspection and Maintenance Program of the Y- 12 Groundwater Protection Program (GWPP), at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12). This report formally documents well inspections completed by the GWPP on active and inactive wells at Y-12 during calendar years (CY) 2010 through 2012. In addition, this report also documents well inspections performed under the Y-12 Water Resources Restoration Program, which is administered by URS|CH2M Oak Ridge (UCOR). This report documents well maintenance activities completed since the last triennial inspection event (CY 2009); and provides summary tables of well inspections and well maintenance activities during the reference time period.

  1. South Blackwater Coal`s maintenance program

    Energy Technology Data Exchange (ETDEWEB)

    Nash, J. [South Blackwater Coal Limited, Blackwater, Qld. (Australia)

    1998-09-01

    The South Blackwater operation consists of two opencut mining areas and two underground mines (Laleham and Kenmure) near Blackwater in central Queensland, all of which supply coal to a central coal preparation plant. South Blackwater Coal Ltd. recently developed a maintenance improvement programme, described in this article. The programme involved implementation systems of key performance indicators (KPIs), benchmaking, condition monitoring, work planning and control, failure analysis and maintenance audit. Some improvements became almost immediately apparent, others were quite gradual. Major results included: improved availability (and reliability) of all opencast fleets, improvements in rear dump availability; reduced maintenance man-hours for opencast fleets; and increased availability of the coal handling and preparation plant. The paper is an edited version of that presented at the `Maintenance in mining conference` 16-19 March 1998, held in Bali, Indonesia. 4 figs., 2 photos.

  2. Y-12 Groundwater Protection Program CY 2009 Triennial Report Of The Monitoring Well Inspection And Maintenance Program, Y-12 National Security Complex, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-06-01

    This document is the triennial report for the Well Inspection and Maintenance Program of the Y- 12 Groundwater Protection Program (GWPP), at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12). This report formally documents well inspection events conducted on active and inactive wells at Y-12 during calendar years (CY) 2007 through 2009; it documents well maintenance and plugging and abandonment activities completed since the last triennial inspection event (CY 2006); and provides summary tables of well inspection events, well maintenance events, and well plugging and abandonment events during the reference time period.

  3. The Effectiveness of Stress Management Program on Quality of Life among Methadone Maintenance Treatment Members

    Directory of Open Access Journals (Sweden)

    s Zarei

    2014-11-01

    Full Text Available Objective: The aim of present study was to investigate the effectiveness of stress management program on quality of life among methadone maintenance treatment members. Method: In this pre-test, post-test experimental study, 30 individual who referred to Saba MMT center in Pakdasht were randomly divided into experimental group (n=15 participants and control group (n=15 participants. The experimental group was undergone ten 90 minutes sessions of stress management program and the control group didn’t receive any treatment program. Quality of life questionnaire (SF-36 was administered. Result: The results showed that the mean sf-36 score in the experimental group had significant higher increased in comparison of control group. Conclusion: It can be concluded stress management program is effective on increasing of quality of life among methadone maintenance treatment members.

  4. Creation of an instrument maintenance program at W. M. Keck Observatory

    Science.gov (United States)

    Hill, G. M.; Kwok, S. H.; Mader, J. A.; Wirth, G. D.; Dahm, S. E.; Goodrich, R. W.

    2014-08-01

    Until a few years ago, the W. M. Keck Observatory (WMKO) did not have a systematic program of instrument maintenance at a level appropriate for a world-leading observatory. We describe the creation of such a program within the context of WMKO's lean operations model which posed challenges but also guided the design of the system and resulted in some unique and notable capabilities. These capabilities and the flexibility of the system have led to its adoption across the Observatory for virtually all PM's. The success of the Observatory in implementing the program and its impact on instrument reliability are presented. Lessons learned are reviewed and strategic implications discussed.

  5. Four Generations of Maintenance Resource Management Programs in the United States: An Analysis of the Past, Present, and Future

    Science.gov (United States)

    Taylor, James C.; Patankar, Manoj S.

    2001-01-01

    This paper analyzes four generations of Maintenance Resource Management (MRM) programs implemented by aviation maintenance organizations in the United States. Data collected from over ten years of survey research and field observations are used for this analysis; they are presented in a case-study format. The first three generations of MRM programs were episodic efforts to increase safety through teamwork, focus group discussions, and awareness courses, respectively. Now, the fourth generation programs, characterized by a commitment to long-term communication and behavioral changes in maintenance, are set to build on those earlier generations, toward a culture of mutual trust between mechanics, their managers, and regulators.

  6. Annual summary report of the Decontamination and Decommissioning Surveillance and Maintenance Program at Oak Ridge National Laboratory for period ending September 30, 1994

    International Nuclear Information System (INIS)

    Anderson, L.A.; Burwinkle, T.W.; Ford, M.K.; Gaddis, H.R.; Holder, L. Jr.; Mandry, G.J.; Nelson, T.R.; Patton, B.D.

    1995-03-01

    The Surplus Facilities Management Program (SFMP) was established at Oak Ridge National Laboratory (ORNL) in 1976 to provide collective management of all surplus sites under ORNL's control on the Oak Ridge Reservation. Presently, over 50 facilities, grouped into projects, are currently managed by the Decontamination and Decommissioning Program, the successor program to the SFMP. Support includes (1) surveillance and maintenance planning; (2) routine surveillance and maintenance; and (3) special maintenance projects. This report documents routine surveillance and maintenance, special projects, and special maintenance performed on these facilities for the period of October 1993 through September 1994

  7. Maintenance for the Millennium: Another Approach

    International Nuclear Information System (INIS)

    Sculthorpe, Barruy R.

    2002-01-01

    Nuclear units nationwide are struggling to increase plant reliability and availability while at the same time reduce their operating and maintenance costs. Some very costly investments have been made in programs such as Reliability Centered Maintenance [RCM]. Florida Power and Light's approach at the St. Lucie Nuclear Plant has taken a slightly different approach. Building on our knowledge of the RCM process and an already existing 'World Class' Predictive Maintenance Program, a 'Condition-Based' Maintenance Program that takes advantage of the RCM philosophy and our toolbox full of advanced and highly successful predictive maintenance technologies. These tools currently consist of vibration analysis, lubricant analysis (both physical property and wear metals analysis, thermographic analysis, motor current signature analysis, tribology and process parameter trending. All employed with the intent to evaluate a machines health. This machine health check allows the forecasting of future preventative maintenance [PM's] tasks and the revision of existing PM's to maximize machine performance and eliminate 'no-value-added' maintenance activities/costs. Within the last year, the Condition-Based Maintenance Program has produced a cost saving of approximately $1.5 million dollars. As the program matures, these cost savings will accumulate well into the millennium. (authors)

  8. Two Different Maintenance Strategies in the Hospital Environment: Preventive Maintenance for Older Technology Devices and Predictive Maintenance for Newer High-Tech Devices

    OpenAIRE

    Sezdi, Mana

    2016-01-01

    A maintenance program generated through the consideration of characteristics and failures of medical equipment is an important component of technology management. However, older technology devices and newer high-tech devices cannot be efficiently managed using the same strategies because of their different characteristics. This study aimed to generate a maintenance program comprising two different strategies to increase the efficiency of device management: preventive maintenance for older tec...

  9. Design, Development, and Maintenance of the GLOBE Program Website and Database

    Science.gov (United States)

    Brummer, Renate; Matsumoto, Clifford

    2004-01-01

    This is a 1-year (Fy 03) proposal to design and develop enhancements, implement improved efficiency and reliability, and provide responsive maintenance for the operational GLOBE (Global Learning and Observations to Benefit the Environment) Program website and database. This proposal is renewable, with a 5% annual inflation factor providing an approximate cost for the out years.

  10. 2003 Long-Term Surveillance and Maintenance Program Report

    International Nuclear Information System (INIS)

    2004-01-01

    are part of long-term site management. In response to post-closure care requirements set forth in UMTRCA, DOE Headquarters established the Long-Term Surveillance and Maintenance (LTS&M) Program in 1988 at the DOE office in Grand Junction, Colorado. The program assumed long-term management responsibility for sites remediated under UMTRCA and other programs. Since its inception, the LTS&M Program has evolved in response to changing stakeholder needs, improvements in technology, and the addition of more DOE sites as remediation is completed. The mission of the LTS&M Program was to fulfill DOE's responsibility to implement all activities necessary to ensure regulatory compliance and to protect the public and the environment from long-lived wastes associated with the nation's nuclear energy, weapons, and research activities. Key components of the LTS&M Program included stakeholder participation, site monitoring and maintenance, records and information management, and research and technology transfer. This report presents summaries of activities conducted in 2003 in fulfillment of the LTS&M Program mission. On December 15, 2003, DOE established the Office of Legacy Management (LM) to allow for optimum management of DOE's legacy responsibilities. Offices are located in Washington, DC, Grand Junction, Colorado, Morgantown, West Virginia, and Pittsburgh, Pennsylvania, to perform long-term site management, land management, site transition support, records management, and other related tasks. All activities formerly conducted under the LTS&M Program have been incorporated into the Office of Land and Site Management (LM-50), as well as management of remedies involving ground water and surface water contaminated by former processing activities

  11. 2003 Long-Term Surveillance and Maintenance Program Report

    Energy Technology Data Exchange (ETDEWEB)

    None

    2004-07-01

    are part of long-term site management. In response to post-closure care requirements set forth in UMTRCA, DOE Headquarters established the Long-Term Surveillance and Maintenance (LTS&M) Program in 1988 at the DOE office in Grand Junction, Colorado. The program assumed long-term management responsibility for sites remediated under UMTRCA and other programs. Since its inception, the LTS&M Program has evolved in response to changing stakeholder needs, improvements in technology, and the addition of more DOE sites as remediation is completed. The mission of the LTS&M Program was to fulfill DOE’s responsibility to implement all activities necessary to ensure regulatory compliance and to protect the public and the environment from long-lived wastes associated with the nation’s nuclear energy, weapons, and research activities. Key components of the LTS&M Program included stakeholder participation, site monitoring and maintenance, records and information management, and research and technology transfer. This report presents summaries of activities conducted in 2003 in fulfillment of the LTS&M Program mission. On December 15, 2003, DOE established the Office of Legacy Management (LM) to allow for optimum management of DOE’s legacy responsibilities. Offices are located in Washington, DC, Grand Junction, Colorado, Morgantown, West Virginia, and Pittsburgh, Pennsylvania, to perform long-term site management, land management, site transition support, records management, and other related tasks. All activities formerly conducted under the LTS&M Program have been incorporated into the Office of Land and Site Management (LM–50), as well as management of remedies involving ground water and surface water contaminated by former processing activities.

  12. Two Different Maintenance Strategies in the Hospital Environment: Preventive Maintenance for Older Technology Devices and Predictive Maintenance for Newer High-Tech Devices.

    Science.gov (United States)

    Sezdi, Mana

    2016-01-01

    A maintenance program generated through the consideration of characteristics and failures of medical equipment is an important component of technology management. However, older technology devices and newer high-tech devices cannot be efficiently managed using the same strategies because of their different characteristics. This study aimed to generate a maintenance program comprising two different strategies to increase the efficiency of device management: preventive maintenance for older technology devices and predictive maintenance for newer high-tech devices. For preventive maintenance development, 589 older technology devices were subjected to performance verification and safety testing (PVST). For predictive maintenance development, the manufacturers' recommendations were used for 134 high-tech devices. These strategies were evaluated in terms of device reliability. This study recommends the use of two different maintenance strategies for old and new devices at hospitals in developing countries. Thus, older technology devices that applied only corrective maintenance will be included in maintenance like high-tech devices.

  13. Turbine maintenance and modernization

    Energy Technology Data Exchange (ETDEWEB)

    Unga, E [Teollisuuden Voima Oy, Olkiluoto (Finland)

    1999-12-31

    The disturbance-free operation of the turbine plant plays an important role in reaching good production results. In the turbine maintenance of the Olkiluoto nuclear power plant the lifetime and efficiency of turbine components and the lifetime costs are taken into account in determining the turbine maintenance and modernization/improvement program. The turbine maintenance program and improvement/modernization measures taken in the plant units are described in this presentation. (orig.)

  14. Turbine maintenance and modernization

    Energy Technology Data Exchange (ETDEWEB)

    Unga, E. [Teollisuuden Voima Oy, Olkiluoto (Finland)

    1998-12-31

    The disturbance-free operation of the turbine plant plays an important role in reaching good production results. In the turbine maintenance of the Olkiluoto nuclear power plant the lifetime and efficiency of turbine components and the lifetime costs are taken into account in determining the turbine maintenance and modernization/improvement program. The turbine maintenance program and improvement/modernization measures taken in the plant units are described in this presentation. (orig.)

  15. Portsmouth Gaseous Diffusion Plant Decontamination and Decommissioning Program surveillance and maintenance plan, FY 1993--2002

    International Nuclear Information System (INIS)

    Schloesslin, W.

    1992-11-01

    The Decontamination and Decommissioning (D ampersand D) Program at the Portsmouth Gaseous Diffusion Plant (PORTS) is part of the Environmental Restoration (ER) and Waste Management (WM) Programs (ERWM). The objective of the ER Program is to provide PORTS the capability to meet applicable environmental regulations through facility development activities and site remedial actions. The WM Program supports the ER Program. The D ampersand D Program provides collective management of the sites within the plant which require decontamination and decommissioning, prioritizes those areas in terms of health, safety and environmental concerns, and implements the appropriate level of remedial action. The D ampersand D Program provides support to facilities which formerly served one or more of the many Plant functions. Program activities include (1) surveillance and maintenance of facilities awaiting decommissioning; (2) planning safe and orderly facility decommissioning; and (3) implementing a program to accomplish facility disposition in a safe, cost effective, and timely manner. In order to achieve the first objective, a formal plan which documents the surveillance and maintenance needs for each inactive facility has been prepared. This report provides this documentation for the PORTS facilities currently included in the D ampersand D Program and includes projected resource requirements for the planning period of FY 1993 through FY 2002

  16. Attitude toward the out-patient cardiac rehabilitation program and facilitators for maintenance of exercise behavior.

    Science.gov (United States)

    Wong, Eliza M L; Zhong, Xue Bing; Sit, Janet W H; Chair, Sek Ying; Leung, Doris Y P; Leung, Carmen; Leung, K C

    2016-09-01

    This study examined the attitudes of Chinese patients with coronary heart disease (CHD) toward the outpatient cardiac rehabilitation program (OCRP), as well as their exercise behavior, intention, maintenance and related factors. A qualitative descriptive study design was used, and 22 CHD patients were recruited in Hong Kong in 2014. In-depth interviews and content analyses were conducted. The tripartite model of attitudes was adopted as research framework. Two themes were identified: (1) informant attitude (perception, affection, and practice) toward the OCRP and (2) Exercise Behavior - intention, maintenance and its related factors. Most informants showed positive perception and affection regarding the outpatient rehabilitation program, leading to regular practice of exercise in the program and at home. Peer, group dynamic, social support and Chinese culture influences on exercise behavior may serve as major facilitators to maintain exercise behavior. Positive attitude toward the OCRP enhanced the participation rate, whereas peer and social support from the family and workplace were useful to improve the maintenance of exercise behavior. Overall, this study provides insights into strategic planning for the OCRP and continual support for CHD patients in the community.

  17. A Vocational Program for Recreational Vehicle Maintenance/Repair. A Report, 1977-78.

    Science.gov (United States)

    1978

    This report contains a secondary school curriculum guide designed to be used by vocational teachers in a one- or two-year recreational vehicle maintenance/repair program. In the preliminary pages, a description is given of the project that developed the curriculum, outlining its objectives and procedures in formulating the model interdisciplinary…

  18. Results of calendar year 1994 monitor well inspection and maintenance program, Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    McMaster, B.W.; Jones, S.B.; Sitzler, J.L.

    1995-06-01

    This document is a compendium of results of the calendar year 1994 Monitor Well Inspection and Maintenance Program at the Department of Energy Y-12 Plant in Oak Ridge, Tennessee. This report documents the work relating to well inspections and maintenance requests. Inspections are implemented in order to better assess the condition and maintenance needs of wells that are actively being monitored. Currently this approach calls for inspecting all wells on a routine (annual or triennial) basis which are: (1) in an active sampling program; (2) included in a hydrologic study; or (3) not in service, but not scheduled for plugging and abandonment. Routine inspections help to ensure that representative groundwater samples and hydrologic data are being collected, and contribute to the life expectancy of each well. This report formally presents well inspection and maintenance activities that were conducted at the Y-12 Plant during 1994. All inspections were conducted between April and December

  19. Results of calendar year 1994 monitor well inspection and maintenance program, Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    McMaster, B.W. [Univ. of Tennessee, Knoxville, TN (United States); Jones, S.B.; Sitzler, J.L. [Oak Ridge National Lab., TN (United States)

    1995-06-01

    This document is a compendium of results of the calendar year 1994 Monitor Well Inspection and Maintenance Program at the Department of Energy Y-12 Plant in Oak Ridge, Tennessee. This report documents the work relating to well inspections and maintenance requests. Inspections are implemented in order to better assess the condition and maintenance needs of wells that are actively being monitored. Currently this approach calls for inspecting all wells on a routine (annual or triennial) basis which are: (1) in an active sampling program; (2) included in a hydrologic study; or (3) not in service, but not scheduled for plugging and abandonment. Routine inspections help to ensure that representative groundwater samples and hydrologic data are being collected, and contribute to the life expectancy of each well. This report formally presents well inspection and maintenance activities that were conducted at the Y-12 Plant during 1994. All inspections were conducted between April and December.

  20. Preventative Maintenance.

    Science.gov (United States)

    Migliorino, James

    Boards of education must be convinced that spending money up front for preventive maintenance will, in the long run, save districts' tax dollars. A good program of preventive maintenance can minimize disruption of service; reduce repair costs, energy consumption, and overtime; improve labor productivity and system equipment reliability; handle…

  1. Pacific Northwest Laboratory Maintenance Implementation plan

    International Nuclear Information System (INIS)

    Bright, J.D.

    1992-06-01

    This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory's (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change number-sign 3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services' current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods

  2. Weight maintenance through behaviour modification with a cooking course or neurolinguistic programming.

    Science.gov (United States)

    Sørensen, Lone Brinkmann; Greve, Tine; Kreutzer, Martin; Pedersen, Ulla; Nielsen, Claus Meyer; Toubro, Søren; Astrup, Arne

    2011-01-01

    We compared the effect on weight regain of behaviour modification consisting of either a gourmet cooking course or neurolinguistic programming (NLP) therapy. Fifty-six overweight and obese subjects participated. The first step was a 12-week weight loss program. Participants achieving at least 8% weight loss were randomized to five months of either NLP therapy or a course in gourmet cooking. Follow-up occurred after two and three years. Forty-nine participants lost at least 8% of their initial body weight and were randomized to the next step. The NLP group lost an additional 1.8 kg and the cooking group lost 0.2 kg during the five months of weight maintenance (NS). The dropout rate in the cooking group was 4%, compared with 26% in the NLP group (p=0.04). There was no difference in weight maintenance after two and three years of follow-up. In conclusion, weight loss in overweight and obese participants was maintained equally efficiently with a healthy cooking course or NLP therapy, but the dropout rate was lower during the active cooking treatment.

  3. Annual summary report on the surveillance and maintenance activities for the Oak Rige National Laboratory Environmental Restoration Program for fiscal year 1995

    International Nuclear Information System (INIS)

    1995-11-01

    This Annual Summary Report on the Surveillance and Maintenance Activities for the Oak Ridge National Laboratory Environmental Restoration Program for Fiscal Year 1995 was prepared to communicate the accomplishments of the Program during fiscal year 1995. This work was performed under work breakdown structure element 1.4.12.6.1.14.20 (activity data sheet 3314, ''Remedial Action Surveillance and Maintenance''). Publication of this document meets the Life Cycle Baseline milestone date of November 30, 1995. This document provides the accomplishments for both the Remedial Action and Decontamination and Decommissioning Surveillance and Maintenance programs

  4. 340 Facility maintenance implementation plan

    International Nuclear Information System (INIS)

    1995-03-01

    This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the 340 Facility. This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4B, Maintenance Management Program (DOE 1994), Chapter II. The objective of this plan is to provide baseline information for establishing and identifying Westinghouse Hanford Company (WHC) conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at the 340 Facility. Primary responsibility for the performance and oversight of maintenance activities at the 340 Facility resides with Westinghouse Hanford Company (WHC). Maintenance at the 340 Facility is performed by ICF-Kaiser Hanford (ICF-KH) South Programmatic Services crafts persons. This 340 Facility MIP provides interface requirements and responsibilities as they apply specifically to the 340 Facility. This document provides an implementation schedule which has been developed for items considered to be deficient or in need of improvement. The discussion sections, as applied to implementation at the 340 Facility, have been developed from a review of programs and practices utilizing the graded approach. Biennial review and additional reviews are conducted as significant programmatic and mission changes are made. This document is revised as necessary to maintain compliance with DOE requirements

  5. 340 Facility maintenance implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the 340 Facility. This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4B, Maintenance Management Program (DOE 1994), Chapter II. The objective of this plan is to provide baseline information for establishing and identifying Westinghouse Hanford Company (WHC) conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at the 340 Facility. Primary responsibility for the performance and oversight of maintenance activities at the 340 Facility resides with Westinghouse Hanford Company (WHC). Maintenance at the 340 Facility is performed by ICF-Kaiser Hanford (ICF-KH) South Programmatic Services crafts persons. This 340 Facility MIP provides interface requirements and responsibilities as they apply specifically to the 340 Facility. This document provides an implementation schedule which has been developed for items considered to be deficient or in need of improvement. The discussion sections, as applied to implementation at the 340 Facility, have been developed from a review of programs and practices utilizing the graded approach. Biennial review and additional reviews are conducted as significant programmatic and mission changes are made. This document is revised as necessary to maintain compliance with DOE requirements.

  6. Reliability centered maintenance streamlining through lessons learned

    International Nuclear Information System (INIS)

    Strong, D.K.

    1991-01-01

    In late 1986, PSE and G concluded that the Nuclear Department would develop a consistent approach to maintenance at Artificial Island (Salem and Hope Creak nuclear units). Preventive maintenance (PM) would be the heart of this approach. In the last six months of 1987 departments affected by the maintenance program participated on working groups that developed the Artificial Island maintenance philosophy. The central theme of the maintenance philosophy is the RCM (reliability centered maintenance) process. A pilot project tested the process in 1988. In 1989 the Central PM Group formed and in 1990 was given responsibility and authority to analyze, approve, implement, and control PM program changes. RCM is the central theme of the PM improvement effort but not the whole effort. Other important pieces included in this paper are: development of a common PM program, improvement of work instructions, development of predictive maintenance techniques into programs, development of a PM basis database, development of PM feedback from failure trends, root cause analysis, maintenance performance indicators, technicians, and engineers

  7. Maintenance program, organization and procedures

    International Nuclear Information System (INIS)

    Schegk, J.R.R.

    1986-01-01

    The Rheinisch-Westfaelisches Elektrizitaetswerk AG (RWE) operates two pressurized water reactors (PWR) with 1.200 MW and 1.300 MW and two boiling water reactors (BWR) with an electrical output of 1.300 MW each. The PWR were commissioned in 1975 and 1977 respectively and have so far achieved a cumulative availability of 72%. The BWR started operating in 1984 and 1985. Since than they have been generating with a cumulative availability of 88%. The reliability of the nuclear power stations resulted in a trouble-free operation. For the last two years, the unscheduled non-availability amounted to 3,7% and 6,5% for the PWR and the BWR respectively. These favourable operating results derive inter alia from systematic preventive maintenance and consistent outage management. Apart from the personnel structure in the power stations the functional sequence of planning, control, performance as well as evaluation of maintenance results constitute a closed cycle. In order to ensure and support an effective cooperation of the above mentioned four functional sequences of a cycle, uniform and computer-assisted information and planning aids have been introduced such as task lists, job ordering, time scheduling and materials management. As a result of this preventive maintenance system the average refueling outage period is 35 to 42 days. (orig.)

  8. Management of maintenance activities at Cernavoda NPP

    International Nuclear Information System (INIS)

    Riedel, M.; Urjan, R.; Marinescu, S.; Corlan, L.

    2000-01-01

    After the Construction and Commissioning phases are over, the safety and economic performances of each nuclear unit are determined by the quality of its operation as well as by the combination of reliability and availability of the systems consisting the whole unit. Therefore, the value of a good maintenance program in making a safe and profitable operation is now widely recognized; all stations operating with excellent performance have well-defined policies and effectively administered programs to govern maintenance activities. The Cernavoda maintenance optimization initiative is derived from good practices suggested by such recognized bodies as the IAEA, INPO and EPRI. It should be noted that the program is evolving at this time and that this paper is an attempt to summarize the myriad of activities and plans required to finally implement the maintenance program. Although many of the elements of the program are in place, many are in various stages of completion. The main components of the program (policy's objectives, strategies used, specific subprograms, maintenance plans and their integration) are presented in brief along with the performance indicators used to assess the effectiveness of the program and maintenance activities. The new programs intended to be developed are also specified, as well as the main comments and recommendations received from IAEA experts. (author)

  9. The Development and Maintenance of Exemplary Formal Mentoring Programs in Fortune 500 Companies

    Science.gov (United States)

    Hegstad, Christine D.; Wentling, Rose Mary

    2004-01-01

    This study sought to advance current mentoring research by examining the development and maintenance of exemplary formal mentoring programs in the nation's top performing companies. The ADDIE model of instructional systems design, which incorporates five steps from needs analysis to evaluation, formed the conceptual framework guiding the study.…

  10. Regulatory approach of the monitoring the effectiveness of maintenance at nuclear power plants program

    International Nuclear Information System (INIS)

    Vajgel, Stefan

    2009-03-01

    The electrical power generation using nuclear power plants requires this installation being safety, reliable and available for the working periods. For this purpose, an adequate, effective and well conducted maintenance program makes an essential and useful tool to the owner of the plant. However, it is necessary to follow the regulatory requirements for this program implementation which monitories this maintenance effectiveness. There are Brazilian norms requirements which must be followed. The international regulatory guides establish these requirements in good details but it is necessary to verify if this methodology for implementing can be totally applied here in Brazil. Then, the american guide NUMARC 93-01 which details how can be implemented a program for this monitoring, shows some methods for using. In this thesis, the Delphi and Probabilistic Safety Analysis were briefly included because they were preferred for implementing this monitoring.in a Brazilian plant. The results which are being obtained show that, looking the regulatory aspects, the NUMARC 93-01 follows our regulations and gives good results for the plant management. (author)

  11. 38 CFR 1.478 - Disclosures to prevent multiple enrollments in detoxification and maintenance treatment programs...

    Science.gov (United States)

    2010-07-01

    ... psychological effects incident to withdrawal from the sustained use of a narcotic drug. (3) Maintenance... heroin or other morphine-like drugs. (4) Member program means a non-VA detoxification treatment or...

  12. The Effect of a Multiple Treatment Program and Maintenance Procedures on Smoking Cessation.

    Science.gov (United States)

    Powell, Don R.

    The efficacy of a multiple treatment smoking cessation program and three maintenance strategies was evaluated. Phases I and II of the study involved 51 subjects who participated in a five-day smoking cessation project consisting of lectures, demonstrations, practice exercises, negative smoking, and the teaching of self-control procedures. At the…

  13. Surveillance and Maintenance Plan for the ORNL Decontamination and Decommissioning Program FY 1993--2002

    International Nuclear Information System (INIS)

    Ford, M.K.; Holder, L. Jr.

    1992-07-01

    The Decontamination and Decommissioning (D ampersand D) Program at the Oak Ridge National Laboratory (ORNL) is part of the Department of Energy (DOE) Environmental Restoration D ampersand D program. The purpose and objectivesof this program include: (1) surveillance and maintenance (S ampersand M) of facilities awaiting decommissioning; (2) planning for the orderly decommissioning of these facilities; and (3) implementation of a program to accomplish facility disposition in a safe, cost-effective, and timely manner. Participating D ampersand D contractors are required to prepare formal plans that document the S ampersand M programs established for each site. This report has been prepared to provide this documentation for those facilities included in the ORNL D ampersand D Program

  14. Maintenance analysis method and operational feedback: a comprehensive maintenance management

    International Nuclear Information System (INIS)

    Mathieu Riou; Victor Planchon

    2006-01-01

    Full text of publication follows: Current periodic inspections program carried out on the COGEMA LOGISTICS casks is required by regulations and approved by the competent Authority. Thus, Safety and casks conformity to the according certificate of approval are guaranteed. Nonetheless, based on experience it appeared that some maintenance operations did not seem relevant or were redundant. Then, it was decided to rethink completely our maintenance program to reach the following objectives: - Set up the 'a minima' required inspection operations required to guarantee Safety and conformity to the certificate of approval, - Optimize criteria and periodicities of inspections taking into account: operational feedback, routine inspections carried out for each transport, regulations, environmental impact (ALARA, waste reduction,...), cost-effectiveness (reduction of cask's immobilization period,...). - Set up a maintenance program in Safety Analysis Reports that: stands alone (no need to check the specification or the certificate of approval to have the complete list of inspections mandatory to guarantee Safety), gives objectives instead of means of controls. This approach needs then to be re-evaluated by the competent Authority. Study's scope has been limited to the TN TM 12 cask family which is intensely used. COGEMA LOGISTICS has a high operational feedback on these casks. After Authority agreement, and in accordance with its requirements, study will then be extended to the other casks belonging to the COGEMA LOGISTICS cask fleet. Actually, the term 'maintenance' is linked to 'Base maintenance' and 'Main maintenance' and implicitly means that the cask is immobilized for a given period. To emphasize the modifications, the term 'maintenance' is no longer used and is substituted by 'periodic upkeep'. By changing the name, COGEMA LOGISTICS wants to emphasize that: some operations can for instance be realized while the cask is unloaded, periodicities are thought in terms of

  15. Facility Decontamination and Decommissioning Program Surveillance and Maintenance Plan, Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Poderis, Reed J. [NSTec; King, Rebecca A. [NSTec

    2013-09-30

    This Surveillance and Maintenance (S&M) Plan describes the activities performed between deactivation and final decommissioning of the following facilities located on the Nevada National Security Site, as documented in the Federal Facility Agreement and Consent Order under the Industrial Sites program as decontamination and decommissioning sites: ? Engine Maintenance, Assembly, and Disassembly (EMAD) Facility: o EMAD Building (Building 25-3900) o Locomotive Storage Shed (Building 25-3901) ? Test Cell C (TCC) Facility: o Equipment Building (Building 25-3220) o Motor Drive Building (Building 25-3230) o Pump Shop (Building 25-3231) o Cryogenic Lab (Building 25-3232) o Ancillary Structures (e.g., dewars, water tower, piping, tanks) These facilities have been declared excess and are in various stages of deactivation (low-risk, long-term stewardship disposition state). This S&M Plan establishes and implements a solid, cost-effective, and balanced S&M program consistent with federal, state, and regulatory requirements. A graded approach is used to plan and conduct S&M activities. The goal is to maintain the facilities in a safe condition in a cost-effective manner until their final end state is achieved. This plan accomplishes the following: ? Establishes S&M objectives and framework ? Identifies programmatic guidance for S&M activities to be conducted by National Security Technologies, LLC, for the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) ? Provides present facility condition information and identifies hazards ? Identifies facility-specific S&M activities to be performed and their frequency ? Identifies regulatory drivers, NNSA/NFO policies and procedures, and best management practices that necessitate implementation of S&M activities ? Provides criteria and frequencies for revisions and updates ? Establishes the process for identifying and dispositioning a condition that has not been previously identified or

  16. Maintenance implementation plan for fuel supply shutdown

    International Nuclear Information System (INIS)

    Stephenson, R.L.

    1995-06-01

    This Maintenance Implementation Plan is written to satisfy the requirements of DOE Order 4330.4B, ''MAINTENANCE MANAGEMENT PROGRAM'', that specifies the general policy and objectives for the establishment of DOE controlled maintenance programs. These Programs provide for the management and performance of cost-effective maintenance and repair of Department of Energy (DOE) property, which includes facilities. A review of DOE Order 4330.4B, particularly Chapter II the nuclear portion, against existing WHC site programs and policies has provided assurance that most requirements of this order have already been implemented by existing WHC programs. Applicable requirements and guidelines of 4330.4B that are deficient or not implemented are presently being developed and implemented through WHC site policies and programs. Where no program is presently identified or being developed for 4330.4B requirements, responsibility for implementation has been assigned within this plan

  17. Multiobjective Optimization of Aircraft Maintenance in Thailand Using Goal Programming: A Decision-Support Model

    Directory of Open Access Journals (Sweden)

    Yuttapong Pleumpirom

    2012-01-01

    Full Text Available The purpose of this paper is to develop the multiobjective optimization model in order to evaluate suppliers for aircraft maintenance tasks, using goal programming. The authors have developed a two-step process. The model will firstly be used as a decision-support tool for managing demand, by using aircraft and flight schedules to evaluate and generate aircraft-maintenance requirements, including spare-part lists. Secondly, they develop a multiobjective optimization model by minimizing cost, minimizing lead time, and maximizing the quality under various constraints in the model. Finally, the model is implemented in the actual airline's case.

  18. Remote maintenance in nuclear fuel reprocessing

    International Nuclear Information System (INIS)

    Herndon, J.N.

    1985-01-01

    Remote maintenance techniques applied in large-scale nuclear fuel reprocessing plants are reviewed with particular attention to the three major maintenance philosophy groupings: contact, remote crane canyon, and remote/contact. Examples are given, and the relative success of each type is discussed. Probable future directions for large-scale reprocessing plant maintenance are described along with advanced manipulation systems for application in the plants. The remote maintenance development program within the Consolidated Fuel Reprocessing Program at the Oak Ridge National Laboratory is also described. 19 refs., 19 figs

  19. Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994

    Energy Technology Data Exchange (ETDEWEB)

    Fisk, E.L.

    1994-06-01

    This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work.

  20. Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994

    International Nuclear Information System (INIS)

    Fisk, E.L.

    1994-06-01

    This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work

  1. Electric motor predictive and preventive maintenance guide

    International Nuclear Information System (INIS)

    Oliver, J.A.

    1992-07-01

    Electric motor performance is vital to the reliable and efficient operation of power plants. The failure of one or more critical motors could cause lost capacity and excessive repair and maintenance cost. However, existing maintenance recommendations proposed by vendors for electric motors have sometimes encouraged many overly conservative maintenance practices. These practices have lead to excessive maintenance activities and costs which have provided no extra margin of operability. EPRI has sponsored RP2814-35 to develop a guide which provides power plants with information and guidance for establishing an effective maintenance program which will aid in preventing unexpected motor failures and assist in planning motor maintenance efforts. The guide includes a technical description which summarizes technical data relative to the four basic types of motors and their components in general use in power plants. The significant causes of motor failures are investigated and described in detail and methods to optimize service life and minimize maintenance cost through appropriate preventive maintenance and conditioning program are presented. This guide provides a foundation for an effective electric motor maintenance program and simplifies the selection of predictive and preventive maintenance tasks. Its use will enable maintenance personnel in nuclear and fossil plants to plan motor repairs during scheduled outages and avoid costly unexpected failures

  2. Second Line of Defense: Electronic Maintenance Reports, Local Maintenance Provider User Guide, Rev. 3

    Energy Technology Data Exchange (ETDEWEB)

    Leigh, Richard J.

    2012-09-01

    The Electronic Maintenance Report forms allow Local Maintenance Providers (LMP) and other program staff to enter maintenance information into a simple and secure system. This document describes the features and information required to complete the Maintenance Report forms. It is expected that all Corrective Maintenance Reports from LMPs will be submitted electronically into the SLD Portal. As an exception (e.g., when access to the SLD Portal is unavailable), Maintenance Reports can be submitted via a secure Adobe PDF form available through the Sustainability Manager assigned to each country.

  3. Environmental Restoration Program pollution prevention checklist guide for the surveillance and maintenance project phase

    International Nuclear Information System (INIS)

    1993-09-01

    DOE Order 5820.2 mandates that a surveillance and maintenance program be established in all shut-down facilities to ensure adequate containment of contamination, provide physical safety and security, and reduce potential public and environmental hazards. A key consideration in this process is the prevention of any waste to be generated from these activities. The purpose of this checklist guide is to assist the user with incorporating pollution prevention/waste minimization (PP/WM) in all Surveillance and Maintenance (S ampersand M) phase projects of the Environmental Restoration (ER) Program. This guide will help users document their PP/WM activities for technology transfer and reporting requirements. Automated computer screens will be created from the checklist data to assist users with implementing and evaluating waste reduction. Users can then establish numerical performance measures to measure progress in planning, training, self-assessments, field implementation, documentation, and technology transfer. Cost savings result as users train and assess themselves and perform preliminary waste assessments

  4. CANDU plant maintenance: Recent developments

    International Nuclear Information System (INIS)

    Charlebois, P.

    2000-01-01

    CANDU units have long been recognized for their exceptional safety and reliability. Continuing development in the maintenance area has played a key role in achieving this performance level. For over two decades, safety system availability has been monitored closely and system maintenance programs adjusted accordingly to maintain high levels of performance. But as the plants approach mid life in a more competitive environment and component aging becomes a concern, new methods and techniques are necessary. As a result, recent developments are moving the maintenance program largely from a corrective and preventive approach to predictive and condition based maintenance. The application of these techniques is also being extended to safety related systems. These recent developments include use of reliability centred methods to define system maintenance requirements and strategies. This approach has been implemented on a number of systems at Canadian CANDU plants with positive results. The pilot projects demonstrated that the overall maintenance effort remained relatively constant while the system performance improved. It was also possible to schedule some of the redundant component maintenance during plant operation without adverse impact on system availability. The probabilistic safety assessment was found to be useful in determining the safety implications of component outages. These new maintenance strategies are now making use of predictive and condition based maintenance techniques to anticipate equipment breakdown and schedule preventive maintenance as the need arises rather than time based. Some of these techniques include valve diagnostics, vibration monitoring, oil analysis, thermography. Of course, these tools and techniques must form part of an overall maintenance management system to ensure that maintenance becomes a living program. To facilitate this process and contain costs, new information technology tools are being introduced to provide system engineers

  5. Optimization of surface maintenance

    International Nuclear Information System (INIS)

    Oeverland, E.

    1990-01-01

    The present conference paper deals with methods of optimizing the surface maintenance of steel-made offshore installations. The paper aims at identifying important approaches to the problems regarding the long-range planning of an economical and cost effective maintenance program. The methods of optimization are based on the obtained experiences from the maintenance of installations on the Norwegian continental shelf. 3 figs

  6. TRUPACT-II Container Maintenance Program Plan

    International Nuclear Information System (INIS)

    1991-05-01

    This document details the maintenance, repair, and replacement of components, as well as the documentation required and the procedures to be followed to maintain the integrity of the TRUPACT-II container in accordance with OM-134, TRUPACT-II Container Operations and Maintenance Manual; and the TRUPACT-II Container Certificate of Compliance (Number 9218). The routine shipping and receiving inspections required by the Department of Transportation (DOT), Department of Energy (DOE), Nuclear Regulatory Commission (NRC) and other regulations are not addressed in this document. This document applies to all DOE shipping and receiving sites that use the TRUPACT-II containers

  7. Integer 1/0 Knapsack Problem Dynamic Programming Approach in Building Maintenance Optimization

    Directory of Open Access Journals (Sweden)

    Viska Dewi Fawzy

    2017-12-01

    Full Text Available The most common problem in urban areas is the high public demand and the limited provision of housing. In meeting the needs of affordable housing for low income communities, the Government of Indonesia implements Rusunawa Project. Object of this research is Pandanarang Rusunawa. Rusunawa Pandanarang is one of the vertical housing in Cilacap that is facing deterioration issue and needs good maintenance management. This study aims at insetting priority and optimizing maintenance plan due to limited funds (limited budget and the amount of damage that must be repaired.This study uses one of the optimization methods of Dynamic Programing on the application of Integer 1/0 Knapsack Problem, to determine an schedule the maintenance activities. The Criteria that are used such as: the level of building components damage and the level of occupants participation. In the first criterion, the benefit (p is the percentage of damage that is fixed with the cost (w. While on the second criterion, the benefit (p is the percentage of occupant participation rate on the maintenance activities with the cost (w. For the budget of Rp 125.000.000, 00, it was obtained from the simulation that the value of the optimum solution on the first criterion at the 7th stage of 71.88% with total cost Rp 106.000.000, 00. At the second criterion, the value of the optimum solution at the 7th stage of 89.29% with total cost Rp 124.000.000, 00.

  8. Condition based maintenance pilot projects at Pickering ND

    International Nuclear Information System (INIS)

    Zemdegs, R.T.

    1995-01-01

    Ontario Hydro has recognized that the approaches to maintenance have undergone significant changes to the past decades. The traditional break down maintenance approach has been replaced by preventative maintenance and more recently, by condition based maintenance. The nuclear plants of Ontario Hydro have evaluated on a number of alternative programs to improve their maintenance effectiveness and to reduce costs, including Reliability Centred Maintenance (RCM), call-up review, component-based PM programs, analysis of failure history and so on. Pickering ND (nuclear division) and Ontario Hydro's Nuclear Technologies Services Division, have embarked on a Condition Based Maintenance pilot project to address the above issues as a breakthrough solution for smarter maintenance. The Condition Based Maintenance pilot project will demonstrate an end-to-end process utilizing a Reliability Centred Maintenance structured approach to re-engineer and redefine the existing maintenance programs. The project emphasizes on-condition maintenance where justified, and utilizes an information management tool to provide the required records keeping and analysis infrastructure. This paper briefly describes the planned maintenance model at Pickering ND used to guide the CBM pilot, and an overview of the methodology used to develop on-condition equipment indicators as part of a re-engineered maintenance plan

  9. Successful factors to a better maintenance effectiveness in Cernavoda NPP 's Unit 1

    International Nuclear Information System (INIS)

    Riedel, M.; Bigu, D.

    2001-01-01

    Two tables are presented titled 'Existing maintenance-specific and maintenance-related plant programs' and 'New programs intended to be developed', respectively. In the first table the following items are indicated and commented: 1. Corrective maintenance program; 2. EQ Program; 3. Equipment maintenance history program; 4. In service inspection program; 5. Lube oil analysis program; 6. MOVs program; 7. Operational test procedures; 8. Performance evaluation program; 9. Preventive maintenance program; 10. Spares management program; 11. Vibration monitoring program. In table 2 the following items are indicated and commented: 1. Check Valves program; 2. Electrical Cable Diagnostics; 3. Erosion-corrosion; 4. Temperature monitoring (infra red thermography; noncontact thermometer); 5. Airborne Ultrasound Detection program; 6. PdM Program. A flowchart is presented in figure 1 showing the maintenance strategies' selection. In figure 2 there is presented a flowchart showing the plants maintenance current approach. Finally, in figure 3 the station maintenance program is presented in a diagram structured on the following fields: concepts, requirements, strategies, specific programs and plans

  10. Maintenance and Outage Management Assessment (MOMA)

    International Nuclear Information System (INIS)

    2005-01-01

    The competitive environment has significant implications for nuclear power plant (NPP) operations, which include, inter alia, the need for efficient use of resources and effective management of plant activities of maintenance and outages. The purpose of NPP maintenance and outages is to allow NPPs to use all those functions necessary for safe and reliable power production by keeping them available and adequate maintenance programme is essential. The maintenance programme covers all preventive and remedial measures, both administrative and technical, necessary to identify and mitigate degradation of a functioning system, structure or component, or restore the design functions of a failed system, structure or component to an acceptable level. In response to the needs of MSs, NPES (Nuclear Power Section, Division of Nuclear Power, IAEA) plans to strengthen its services. NPES services will not only continue to provide its 'traditional' products of publications of nuclear industrial best practices and technical implementation of TC projects on plant maintenance and outage management, but also be expanded to deliver, in a timely manner, technical support missions as requested by MSs for NPPs. One of many services is Maintenance and Outage Management Assessment (MOMA). The NPP can obtain support and assistance in assessment and optimisation of its maintenance program and/or outage management. It aims to help the NPP improve its performance of maintenance and outage in a competitive nuclear power business environment. The specific benefits of the assessment are as follows: a) disseminate nuclear industrial best practices on maintenance program and outage management in the world, b) benchmark, evaluate and optimise the approach of maintenance program and outage management and c) identify solutions to known problems at nuclear power plants, if any. MOMA is conducted at the request of NPPs of any IAEA Member States. MOMA consists in a technical mission/visit for 1-3 weeks by

  11. Maintenance of scientific instruments

    International Nuclear Information System (INIS)

    Lucero, E.

    1986-01-01

    During the last years Colombia has increased the use of nuclear techniques, instruments and equipment in ambitious health programs, as well as in research centers, industry and education; this has resulted in numerous maintenance problems. As an alternative solution IAN has established a Central Maintenance Laboratory for nuclear instruments within an International Atomic Energy Agency program for eight Latin American and nine Asian Countries. Established strategies and some results are detailed in this writing

  12. PROMSYS, Plant Equipment Maintenance and Inspection Scheduling

    International Nuclear Information System (INIS)

    Morgan, D.L.; Srite, B.E.

    1986-01-01

    1 - Description of problem or function: PROMSYS is a computer system designed to automate the scheduling of routine maintenance and inspection of plant equipment. This 'programmed maintenance' provides the detailed planning and accomplishment of lubrication, inspection, and similar repetitive maintenance activities which can be scheduled at specified predetermined intervals throughout the year. The equipment items included are the typical pumps, blowers, motors, compressors, automotive equipment, refrigeration units, filtering systems, machine shop equipment, cranes, elevators, motor-generator sets, and electrical switchgear found throughout industry, as well as cell ventilation, shielding, containment, and material handling equipment unique to nuclear research and development facilities. Four related programs are used to produce sorted schedule lists, delinquent work lists, and optional master lists. Five additional programs are used to create and maintain records of all scheduled and unscheduled maintenance history. 2 - Method of solution: Service specifications and frequency are established and stored. The computer program reviews schedules weekly and prints, on schedule cards, instructions for service that is due the following week. The basic output from the computer program comes in two forms: programmed-maintenance schedule cards and programmed-maintenance data sheets. The data sheets can be issued in numerical building, route, and location number sequence as equipment lists, grouped for work assigned to a particular foreman as the foreman's equipment list, or grouped by work charged to a particular work order as the work-order list. Data sheets grouped by equipment classification are called the equipment classification list

  13. Annual summary report of the decontamination and decommissioning surveillance and maintenance program at Oak Ridge National Laboratory for period ending September 30, 1991

    International Nuclear Information System (INIS)

    Ford, M.K.; Holder, L. Jr.

    1991-09-01

    The Surplus Facilities Management Program and Defense Facilities Decommissioning Program were established at Oak Ridge National Laboratory (ORNL) in 1976 in order to provide collective management of all surplus sites under ORNL control on the Oak Ridge Reservation. Some 34 facilities, classified into 3 civilian-related and 8 defense-related projects, are currently managed by the recently integrated Decontamination and Decommissioning Program. Support includes (1) surveillance and maintenance (S ampersand M) planning, (2) routine S ampersand M, and (3) special maintenance projects. This report documents routine S ampersand M, special projects, and special maintenance performed on these facilities for the period of October 1990 through September 1991

  14. Predictive maintenance primer

    International Nuclear Information System (INIS)

    Flude, J.W.; Nicholas, J.R.

    1991-04-01

    This Predictive Maintenance Primer provides utility plant personnel with a single-source reference to predictive maintenance analysis methods and technologies used successfully by utilities and other industries. It is intended to be a ready reference to personnel considering starting, expanding or improving a predictive maintenance program. This Primer includes a discussion of various analysis methods and how they overlap and interrelate. Additionally, eighteen predictive maintenance technologies are discussed in sufficient detail for the user to evaluate the potential of each technology for specific applications. This document is designed to allow inclusion of additional technologies in the future. To gather the information necessary to create this initial Primer the Nuclear Maintenance Applications Center (NMAC) collected experience data from eighteen utilities plus other industry and government sources. NMAC also contacted equipment manufacturers for information pertaining to equipment utilization, maintenance, and technical specifications. The Primer includes a discussion of six methods used by analysts to study predictive maintenance data. These are: trend analysis; pattern recognition; correlation; test against limits or ranges; relative comparison data; and statistical process analysis. Following the analysis methods discussions are detailed descriptions for eighteen technologies analysts have found useful for predictive maintenance programs at power plants and other industrial facilities. Each technology subchapter has a description of the operating principles involved in the technology, a listing of plant equipment where the technology can be applied, and a general description of the monitoring equipment. Additionally, these descriptions include a discussion of results obtained from actual equipment users and preferred analysis techniques to be used on data obtained from the technology. 5 refs., 30 figs

  15. Nuclear adaptor Ldb1 regulates a transcriptional program essential for the maintenance of hematopoietic stem cells.

    Science.gov (United States)

    Li, LiQi; Jothi, Raja; Cui, Kairong; Lee, Jan Y; Cohen, Tsadok; Gorivodsky, Marat; Tzchori, Itai; Zhao, Yangu; Hayes, Sandra M; Bresnick, Emery H; Zhao, Keji; Westphal, Heiner; Love, Paul E

    2011-02-01

    The nuclear adaptor Ldb1 functions as a core component of multiprotein transcription complexes that regulate differentiation in diverse cell types. In the hematopoietic lineage, Ldb1 forms a complex with the non-DNA-binding adaptor Lmo2 and the transcription factors E2A, Scl and GATA-1 (or GATA-2). Here we demonstrate a critical and continuous requirement for Ldb1 in the maintenance of both fetal and adult mouse hematopoietic stem cells (HSCs). Deletion of Ldb1 in hematopoietic progenitors resulted in the downregulation of many transcripts required for HSC maintenance. Genome-wide profiling by chromatin immunoprecipitation followed by sequencing (ChIP-Seq) identified Ldb1 complex-binding sites at highly conserved regions in the promoters of genes involved in HSC maintenance. Our results identify a central role for Ldb1 in regulating the transcriptional program responsible for the maintenance of HSCs.

  16. TRUPACT-II container maintenance program plan

    International Nuclear Information System (INIS)

    1990-11-01

    This document details the maintenance/repair and replacement of components, as well as the documentation required and the procedures to be followed to maintain the integrity of the TRUPACT-II container, in accordance with requirements of the TRUPACT-II Container Operations and Maintenance Manual, OM-134, the TRUPACT-II Container Safety Analysis Report (SARP), and the TRUPACT-II Container Certificate of Compliance (Number 9218). The routine shipping and receiving inspections required by the Department of Transportation (DOT), Department of Energy (DOE), Nuclear Regulatory Commission (NRC) and other regulations are not addressed in this document. This document applies to all DOE shipping and receiving sites that use the TRUPACT-II containers

  17. Maintenance: Two Views.

    Science.gov (United States)

    Ballard, J. Barry; Burdette, Clarence E.

    1987-01-01

    Presents two viewpoints on the question of using funding from the Vocational Education Act to maintain ongoing vocational programs. Ballard argues that programs have improved qualitatively because of additional program improvement monies, whereas Burdette argues that the ban on using funds for maintenance treats some states unfairly. (CH)

  18. Analysis of maintenance strategies

    International Nuclear Information System (INIS)

    Laakso, K.; Simola, K.

    1998-01-01

    The main topics of the presentation include: (1) an analysis model and methods to evaluate maintenance action programs and the support decision to make changes in them and (2) to understand the maintenance strategies in a systems perspective as a basis for future developments. The subproject showed how systematic models for maintenance analysis and decision support, utilising computerised and statistical tool packages, can be taken into use for evaluation and optimisation of maintenance of active systems from the safety and economic point of view

  19. Implementation of laparoscopic hysterectomy: maintenance of skills after a mentorship program.

    Science.gov (United States)

    Twijnstra, A R H; Blikkendaal, M D; Kolkman, W; Smeets, M J G H; Rhemrev, J P T; Jansen, F W

    2010-01-01

    To evaluate the implementation and maintenance of advanced laparoscopic skills after a structured mentorship program in laparoscopic hysterectomy (LH). Cohort retrospective analysis of 104 successive LHs performed by two gynecologists during and after a mentorship program. LHs were compared for indication, patient characteristics and intraoperative characteristics. As a frame of reference, 94 LHs performed by the mentor were analyzed. With regard to indication, blood loss and adverse outcomes, both trainees performed LHs during their mentorship program comparable with the LHs performed by the mentor. The difference in mean operating time between trainees and mentor was not clinically significant. Both trainees progressed along a learning curve, while operating time remained statistically constant and comparable to that of the mentor. After completing the mentorship program, both gynecologists maintained their acquired skills as blood loss, adverse outcome rates and operating time were comparable with the results during their traineeship. A mentorship program is an effective and durable tool for implementing a new surgical procedure in a teaching hospital with respect to patient safety aspects, as indications, operating time and adverse outcome rates are comparable to those of the mentor in his own hospital during and after completing the mentorship program. Copyright © 2010 S. Karger AG, Basel.

  20. Asbestos exposure of building maintenance personnel.

    Science.gov (United States)

    Mlynarek, S; Corn, M; Blake, C

    1996-06-01

    The exposures of building maintenance personnel and occupants to airborne asbestos fibers, and the effects of operations and maintenance programs on those exposures, continue to be an important public health issue. The subject of this investigation was a large metropolitan county with numerous public buildings which routinely conducted air sampling for asbestos. A total of 302 personal air samples in nine task categories collected during maintenance worker activities in proximity to asbestos-containing materials were analyzed; 102 environmental air samples in four task categories were also analyzed. The arithmetic means of the 8-hr time weighted average exposures for personal sampling for each task category were all below the Occupational Safety and Health Administration permissible exposure level of 0.1 fibers (f)/cc > 5 microm. The highest mean 8-hr time weighted average exposure was 0.030 f/cc > 5 microm for ceiling tile replacement. The maximum asbestos concentration during sample collection for environmental samples was 0.027 f/cc > 5 microm. All asbestos-related maintenance work was done within the framework of an Operations and Maintenance Program (OMP) which utilized both personal protective equipment and controls against fiber release/dispersion. Results are presented in association with specific OMP procedures or controls. These results support the effectiveness of using Operations and Maintenance Programs to manage asbestos in buildings without incurring unacceptable risk to maintenance workers performing maintenance tasks.

  1. AUTOMOTIVE DIESEL MAINTENANCE 1. UNIT XX, CUMMINS DIESEL ENGINE, MAINTENANCE SUMMARY.

    Science.gov (United States)

    Minnesota State Dept. of Education, St. Paul. Div. of Vocational and Technical Education.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO PROVIDE A SUMMARY OF THE REASONS AND PROCEDURES FOR DIESEL ENGINE MAINTENANCE. TOPICS ARE WHAT ENGINE BREAK-IN MEANS, ENGINE BREAK-IN, TORQUING BEARINGS (TEMPLATE METHOD), AND THE NEED FOR MAINTENANCE. THE MODULE CONSISTS OF A SELF-INSTRUCTIONAL BRANCH PROGRAMED TRAINING FILM "CUMMINS DIESEL ENGINE…

  2. Reliability Centered Maintenance - Methodologies

    Science.gov (United States)

    Kammerer, Catherine C.

    2009-01-01

    Journal article about Reliability Centered Maintenance (RCM) methodologies used by United Space Alliance, LLC (USA) in support of the Space Shuttle Program at Kennedy Space Center. The USA Reliability Centered Maintenance program differs from traditional RCM programs because various methodologies are utilized to take advantage of their respective strengths for each application. Based on operational experience, USA has customized the traditional RCM methodology into a streamlined lean logic path and has implemented the use of statistical tools to drive the process. USA RCM has integrated many of the L6S tools into both RCM methodologies. The tools utilized in the Measure, Analyze, and Improve phases of a Lean Six Sigma project lend themselves to application in the RCM process. All USA RCM methodologies meet the requirements defined in SAE JA 1011, Evaluation Criteria for Reliability-Centered Maintenance (RCM) Processes. The proposed article explores these methodologies.

  3. Industry assessment of human factors in aviation maintenance and inspection research program : an assessment of industry awareness and use of the Federal Aviation Administration Office of Aviation Medicine Human Factors in Aviation Maintenance and Inspect

    Science.gov (United States)

    1998-03-01

    Ten years ago the Federal Aviation Administration (FAA) Office of Aviation Medicine embarked on a research and development program dedicated to human factors in aviation maintenance and inspection. Since 1989 FAA has invested over $12M in maintenance...

  4. Development of a computational program to planning and control of the IEA-R1 reactor maintenance

    International Nuclear Information System (INIS)

    Martins, Mauro Onofre; Madi Filho, Tufic

    2013-01-01

    Maintenance is an essential activity in nuclear reactors. The components of safety systems of an industrial plant should have a low probability of failure, especially if there is a high risk of accidents that may cause environmental damage. In nuclear facilities, the presence of security systems is a technical specification and a requirement for their license and operation. In order to manage the entire information flow from the maintenance of the IEA-R1, a computational program (software) was developed, which not only plans and control all the maintenance, but also updates the documents and records to safeguard the quality, ensuring the safe operation of the reactor. The software has access levels and provides detailed reports of all maintenance planned and implemented, together with an individual history of the equipment during its lifetime in the facility. This work presents all the stages of the software development, description, compatibility, application, advantages and results obtained experimentally. (author)

  5. North American nuclear maintenance best practices compared to Japanese utility maintenance practices

    International Nuclear Information System (INIS)

    Harazim, M.L.; Ferguson, B.J.

    2003-01-01

    The purpose of this paper is to compare the best practices in North America concerning Preventive Maintenance, Predictive Maintenance and Reliability Centered Maintenance (RCM) or Preventive Maintenance Optimization (PMO) with the time-directed maintenance philosophies utilized by Japanese utilities, and how the Japanese utilities are considering (and some have begun) adopting North American ways of doing business. Preventive Maintenance Living Programs are also discussed, along with the Institute of Nuclear Power Operations AP-913 process, Equipment Reliability Process. Also, a cost benefit analysis will be demonstrated showing how major cost savings can be achieved by shifting from a predominantly time-directed maintenance philosophy to a predominantly predictive strategy utilizing vibration analysis, lubricating oil analysis, thermography and other predictive technologies to better utilize resources, reduce spare part consumption and to minimize maintenance induced errors. As a result of the strides made while incorporating these new philosophies, we no longer advocate tearing apart perfectly good equipment. (author)

  6. A hybrid Constraint Programming/Mixed Integer Programming framework for the preventive signaling maintenance crew scheduling problem

    DEFF Research Database (Denmark)

    Pour, Shahrzad M.; Drake, John H.; Ejlertsen, Lena Secher

    2017-01-01

    A railway signaling system is a complex and interdependent system which should ensure the safe operation of trains. We introduce and address a mixed integer optimisation model for the preventive signal maintenance crew scheduling problem in the Danish railway system. The problem contains many...... to feed as ‘warm start’ solutions to a Mixed Integer Programming (MIP) solver for further optimisation. We apply the CP/MIP framework to a section of the Danish rail network and benchmark our results against both direct application of a MIP solver and modelling the problem as a Constraint Optimisation...

  7. Darlington Station outage - a maintenance perspective

    International Nuclear Information System (INIS)

    Plourde, J.; Marczak, J.; Stone, M.; Myers, R.; Sutton, K.

    1997-01-01

    Ontario Hydro's Darlington Nuclear Generating Station (4x881MW(e)net) has carried out its first station outage since full commercial operation. The outage presented challenges to the organization in terms of outage planning, support, management, and safe execution within the constraints of schedule, budget and resources. This paper will focus on the success of the outage maintenance program, identifying the major work programs - a vacuum structure and containment outage, an emergency service water system outage, an emergency coolant injection system outage, intake channel inspections, low pressure service water inspections, and significant outage maintenance work on each of the four reactor units. Planning for the outage was initiated early in anticipation of this important milestone in the station's life. Detailed safety reviews - nuclear, radiation, and conventional - were conducted in support of the planned maintenance program. System lineup and work protection were provided by the Station Operator work group. Work protection permitry was initiated well in advance of the outage. Station maintenance staff resources were bolstered in support of the outage to ensure program execution could be maintained within the schedule. Training programs were in place to ensure that expectations were clear and that high standards would be maintained. Materials management issues in support of maintenance activities were given high priority to ensure no delays to the planned work. Station management review and monitoring in preparation for and during the outage ensured that staff priorities remained focused. Lessons learned from the outage execution are being formalized in maintenance procedures and outage management procedures, and shared with the nuclear community. (author)

  8. Maintenance viewpoint of a successful reactor program

    International Nuclear Information System (INIS)

    Moffitt, W.C.; Grygiel, M.L.

    1984-05-01

    As the Operating and Support staffs of the FFTF organization have gained experience, the plant reliability and capacity factors have shown a steadily improving trend. The plant capacity factor for Cycle 4 was 99.5%. It is the purpose of this report to describe the evolution of the maintenance organization at the FFTF site from a general support organization to a technically proficient organization playing a major role in planning and performance of plant maintenance evolutions

  9. Adaptation and Implementation of Predictive Maintenance Technique with Nondestructive Testing for Power Plants

    International Nuclear Information System (INIS)

    Jung, Gye Jo; Jung, Nam Gun

    2010-01-01

    Many forces are pressuring utilities to reduce operating and maintenance costs without cutting back on reliability or availability. Many utility managers are re-evaluating maintenance strategies to meet these demands. To utilities how to reduce maintenance costs and extent the effective operating life of equipment, predictive maintenance technique can be adapted. Predictive maintenance had three types program which are in-house program, engineering company program and mixed program. We can approach successful predictive maintenance program with 'smart trust' concept

  10. Operation and maintenance requirements of system design bases

    International Nuclear Information System (INIS)

    Banerjee, A.K.; Hanley, N.E.

    1989-01-01

    All system designs make assumptions about system operation testing, inspection, and maintenance. Existing industry codes and standards explicitly address design requirements of new systems, while issues related to system and plant reliability, life, design margins, effects of service conditions, operation, maintenance, etc., usually are implicit. However, system/component design documents of existing power plants often address the code requirements without considering the operation, maintenance, inspection, and testing (OMIT) requirements. The nuclear industry is expending major efforts at most nuclear power plants to reassemble and/or reconstitute system design bases. Stone ampersand Webster Engineering Corporation (SWEC) recently addressed the OMIT requirements of system/component design as an integral part of a utility's preventive maintenance program. For each component, SWEC reviewed vendor recommendations, NPRDS data/industry experience, the existing maintenance program, component service conditions, and actual plant experience. A maintenance program that considers component service conditions and plant experience ensures a connection between maintenance and design basis. Root cause analysis of failure and engineering evaluation of service condition are part of the program. System/component OMIT requirements also are compared against system design, service condition, degradation mechanism, etc., through system/component life-cycle evaluation

  11. Waste sampling and characterization facility (WSCF) maintenance implementation plan

    International Nuclear Information System (INIS)

    Heinemann, J.L.; Millard, G.E.

    1997-08-01

    This Maintenance Implementation Plan (MIP) is written to satisfy the requirements of the US Department of Energy (DOE) Order 4330.4B, Maintenance Management Program that specifies the general policy and objectives for the establishment of the DOE controlled maintenance programs. These programs provide for the management and performance of cost effective maintenance and repair of the DOE property, which includes facilities. This document outlines maintenance activities associated with the facilities operated by Waste Management Hanford, Inc. (WMH). The objective of this MIP is to provide baseline information for the control and execution of WMH Facility Maintenance activities relative to the requirements of Order 4330.4B, assessment of the WMH maintenance programs, and actions necessary to maintain compliance with the Order. Section 2.0 summarizes the history, mission and description of the WMH facilities. Section 3.0 describes maintenance scope and requirements, and outlines the overall strategy for implementing the maintenance program. Specific elements of DOE Order 4330.4B are addressed in Section 4.0, listing the objective of each element, a discussion of the WMH compliance methodology, and current implementation requirements with references to WMH and HNF policies and procedures. Section 5.0 addresses deviations from policy requirements, and Section 6.0 is a schedule for specific improvements in support of this MIP

  12. Maintenance Staffing Standards for Zero-Based Budgeting.

    Science.gov (United States)

    Adams, Matthew C.; And Others

    1998-01-01

    Discusses school preventive maintenance and the variables associated with maintenance staffing standards that address a zero-based budgeting environment. Explores preventive-maintenance measurement for staffing requirements, defines staffing levels and job descriptions, and outlines the factors to consider when creating a maintenance program and…

  13. Effective maintenance practices to manage system aging

    International Nuclear Information System (INIS)

    Chockie, A.; Bjorkelo, K.

    1992-01-01

    For a variety of economic and technical reasons, there has been a growing concern with the aging of complex systems and components and the role that maintenance can play in reducing this degradation. A study for the Nuclear Regulatory Commission was recently undertaken to identify effective maintenance practices that could be adapted by the nuclear industry in the United States to assist in managing the aging degradation of plant systems and components. Four organizations were examined to assess the influence that their maintenance programs have on their ability to address the systems and component aging degradation issues. An effective maintenance program was found to be essential to the management of system and component aging. The four key elements of an effective maintenance program that are important to an aging management program were identified. These are: the selection of critical systems and components; the development of an understanding of aging through the collection and analysis of equipment performance information; the development of appropriate preventive and predictive maintenance tasks to manage equipment and system aging degradation; the use of feedback mechanisms to continuously improve the management of aging systems and components. These elements were found to be common to all four organizations. In examining how the four organizations have structured their maintenance programs to include these key elements provides valuable lessons not only for the nuclear power industry, but also for any industrial organization that is concerned with the management of system and component aging degradation. This document provides detail, of these studies

  14. TRUPACT-II container maintenance program plan

    International Nuclear Information System (INIS)

    1990-01-01

    This document details the maintenance/repair and replacement of components, as well as the documentation required and the procedures to be followed to maintain the integrity of the TRUPACT-II container

  15. Explaining variations in state foster care maintenance rates and the implications for implementing new evidence-based programs

    Science.gov (United States)

    Goldhaber-Fiebert, Jeremy D.; Babiarz, Kimberly S.; Garfield, Rachel L.; Wulczyn, Fred; Landsverk, John; Horwitz, Sarah M.

    2013-01-01

    Background U.S. Child Welfare systems are involved in the lives of millions of children, and total spending exceeds $26 billion annually. Out-of-home foster care is a critical and expensive Child Welfare service, a major component of which is the maintenance rate paid to support housing and caring for a foster child. Maintenance rates vary widely across states and over time, but reasons for this variation are not well understood. As evidence-based programs are disseminated to state Child Welfare systems, it is important to understand what may be the important drivers in the uptake of these practices including state spending on core system areas. Data and methods We assembled a unique, longitudinal, state-level panel dataset (1990–2008) for all 50 states with annual data on foster care maintenance rates and measures of child population in need, poverty, employment, urbanicity, proportion minority, political party control of the state legislature and governorship, federal funding, and lawsuits involving state foster care systems. All monetary values were expressed in per-capita terms and inflation adjusted to 2008 dollars. We used longitudinal panel regressions with robust standard errors and state and year fixed effects to estimate the relationship between state foster care maintenance rates and the other factors in our dataset, lagging all factors by one year to mitigate the possibility that maintenance rates influenced their predictors. Exploratory analyses related maintenance rates to Child Welfare outcomes. Findings State foster care maintenance rates have increased in nominal terms, but in many states, have not kept pace with inflation, leading to lower real rates in 2008 compared to those in 1991 for 54% of states for 2 year-olds, 58% for 9 year-olds, and 65% for 16 year-olds. In multivariate analyses including socioeconomic, demographic, and political factors, monthly foster care maintenance rates declined $15 for each 1% increase in state unemployment and

  16. Costs of Development and Maintenance of an Internet Program for Teens with Type 1 Diabetes

    Science.gov (United States)

    Grey, Margaret; Liberti, Lauren; Whittemore, Robin

    2015-01-01

    Many adolescents with type 1 diabetes (T1D) have difficulty completing self-management tasks within the context of their social environments. Group-based approaches to psycho-educational support have been shown to prevent declines in glucose control, but are challenging to implement due to youths’ many activities and costs. A novel solution is providing psycho-educational support via the internet. The purpose of this study is to describe the cost of developing and maintaining two internet psycho-educational programs, both of which have been shown to improve health outcomes in adolescents with T1D. We calculated actual costs of personnel and programming in the development of TEENCOPE™ and Managing Diabetes, two highly interactive programs that were evaluated in a multi-site clinical trial (n=320). Cost calculations were set at U.S. dollars and converted to value for 2013 as expenses were incurred over 6 years. Development costs over 1.5 years totaled $324,609, with the majority of costs being for personnel to develop and write content in a creative and engaging format, to get feedback from teens on content and a prototype, and IT programming. Maintenance of the program, including IT support, a part-time moderator to assure safety of the discussion board (0.5–1 hour/week), and yearly update of content was $43,845/year, or $137.00 per youth over 4.5 years. Overall, program and site development were relatively expensive, but the program reach was high, including non-white youth from 4 geographically distinct regions. Once developed, maintenance was minimal. With greater dissemination, cost-per-youth would decrease markedly, beginning to offset the high development expense. PMID:26213677

  17. A COMPUTER BASED MAINTENANCE MANAGEMENT SYSTEM ...

    African Journals Online (AJOL)

    ... programs to schedule for maintenance or replacement of machines has been designed such that it enables the maintenance department control all jobs associated with plant maintenance and breakdown. It predicts the time to failure of designated plants and caters for the replacement analysis of some capital equipment.

  18. Declining trends in early warning indicators for HIV drug resistance in Cameroon from 2008-2010: lessons and challenges for low-resource settings.

    Science.gov (United States)

    Fokam, Joseph; Billong, Serge C; Bissek, Anne C Z K; Kembou, Etienne; Milenge, Pascal; Abessouguie, Ibile; Nkwescheu, Armand S; Tsomo, Zephirin; Aghokeng, Avelin F; Ngute, Grace D; Ndumbe, Peter M; Colizzi, Vittorio; Elat, Jean B N

    2013-04-08

    Rapid scale-up of antiretroviral therapy (ART) and limited access to genotyping assays in low-resource settings (LRS) are inevitably accompanied by an increasing risk of HIV drug resistance (HIVDR). The current study aims to evaluate early warning indicators (EWI) as an efficient strategy to limit the development and spread of preventable HIVDR in these settings, in order to sustain the performance of national antiretroviral therapy (ART) rollout programmes. Surveys were conducted in 2008, 2009 and 2010 within 10 Cameroonian ART clinics, based on five HIVDR EWIs: (1) Good prescribing practices; (2) Patient lost to follow-up; (3) Patient retention on first line ART; (4) On-time drug pick-up; (5) Continuous drug supply. Analysis was performed as per the World Health Organisation (WHO) protocol. An overall decreasing performance of the national ART programme was observed from 2008 to 2010: EWI(1) (100% to 70%); EWI(2) (40% to 20%); EWI(3) (70% to 0%); EWI(4) (0% throughout); EWI(5) (90% to 40%). Thus, prescribing practices (EWI(1)) were in conformity with national guidelines, while patient adherence (EWI(2), EWI(3), and EWI(4)) and drug supply (EWI(5)) were lower overtime; with a heavy workload (median ratio ≈1/64 staff/patients) and community disengagement observed all over the study sites. In order to limit risks of HIVDR emergence in poor settings like Cameroon, continuous drug supply, community empowerment to support adherence, and probably a reduction in workload by task shifting, are the potential urgent measures to be undertaken. Such evidence-based interventions, rapidly generated and less costly, would be relevant in limiting the spread of preventable HIVDR and in sustaining the performance of ART programmes in LRS.

  19. A human factors approach to effective maintenance

    International Nuclear Information System (INIS)

    Penington, J.; Shakeri, S.

    2006-01-01

    Traditionally in the field of Human Factors within the nuclear industry, the focus has been to identify the potential for human errors in operating tasks, and develop strategies to prevent their occurrence, provide recovery mechanisms, and mitigate the consequences of error as appropriate. Past experience has demonstrated however a significant number of human errors within the nuclear industry occur during maintenance tasks. It is for this reason, and the fact that our nuclear power plants are ageing and increasingly in need of maintenance, that the industry must pay more attention to maintenance tasks. The purpose of this paper is to present a framework for effective maintenance programs, and based upon this framework discuss an approach (an audit tool) that can be used to both design such a program, and to assess existing programs. In addition, this tool can form the basis of cost benefit decisions relating to priorities for improvements to existing programs. (author)

  20. Susquehanna SES maintenance supervisor training and certification

    International Nuclear Information System (INIS)

    Deckman, M.

    1991-01-01

    Susquehanna's program targets all Supervisors, Supervisor Candidates, and Temporary Supervisors that are responsible for in-plant maintenance or maintenance support activities, including: mechanical maintenance; electrical maintenance; maintenance support (labor support, radwaste, etc.); mobile construction support (mechanical and electrical); chemistry; health physics; maintenance planning; and instrument and controls. The program integrates the three major areas of direct Supervisory responsibilities: (1) Leadership and Management - Skills that require interpersonal activities that are typically humanistic and subjective; such as coaching, motivating, communications, etc. (2) Technical and Administrative - Knowledge that is directly related to the job of Supervising from the production, regulatory, accountability perspective. These topics are very objective and include training on topics such as workpackages, plant chemistry parameters, radiological concerns, etc. (3) Technical Skills - Ensure each Supervisor is technically competent in the plant systems, components, or equipment he/she is tasked with maintaining or overseeing. Typical skills found in this area are, circuit breaker maintenance, primary system sampling, or overhauling pumps

  1. Maintenance and environmental qualification

    International Nuclear Information System (INIS)

    Martin, R.S.; Austin, D.G.

    1995-01-01

    The design of today's nuclear generating plants involves many detailed design considerations. This includes comprehensive look at aging effects on plant components over their expected lifetimes. This is important to ensuring that the plant operates safely throughout its life. The effects of aging are required to be documented in detail in today's designs. This documentation provides assurance that safe operating conditions are maintained throughout the station life cycle. This requirement is analogous to the longer standing requirement to ensure pressure boundary integrity. The pressure boundary integrity requirement has existed in the industry since its inception. The subject of plant aging effects and the maintenance of functionality is known as Environmental Qualification (EQ). This paper will attempt to explain the wisdom of EQ and the potential for optimizing maintenance activities (to move from reactive to proactive activities), within the context of the overall maintenance program. It is the author's intent to encourage the active involvement of maintenance professionals in the effective implementation of the ongoing EQ program so that the benefits are maximized

  2. Proactive maintenance initiatives at Argonne National Laboratory-West

    International Nuclear Information System (INIS)

    Duckwitz, N.R.; Duncan, L.W.; Whipple, J.J.

    1995-01-01

    In the late 1980's, ANL-W Management foresaw a need to provide dedicated technical support for maintenance supervisors. Maintenance supervisors were facing increased challenges to ensure all environmental, safety, and waste management regulations were followed in daily maintenance activities. This increased burden was diverting supervisory time away from on-the-job supervision. Supervisors were finding less time for their ''mentor'' roles to ensure maintenance focused on finding and correcting root causes. Additionally the traditional maintenance organization could not keep up with the explosion in predictive maintenance technologies. As a result, engineers were tasked to provide direct technical support to the maintenance organization. Today the maintenance technical support group consists of two mechanical engineers, two electrical engineers and an I ampersand C engineer. The group provides a readily available, quick response resource for crafts people and their supervisors. They can and frequently do ask the support group for help to determine the root cause and to effect permanent fixes. Crafts and engineers work together informally to make an effective maintenance team. In addition to day-to-day problem solving, the technical support group has established several maintenance improvement programs for the site. This includes vibration analysis of rotating machinery, testing of fuel for emergency diesel generators, improving techniques for testing of high efficiency particulate air (HEPA) filters, and capacity testing of UPS and emergency diesel starting batteries. These programs have increased equipment reliability, reduced conventional routine maintenance, reduced unexpected maintenance, and improved testing accuracy. This paper will discuss the interaction of the technical support group within the maintenance department. Additionally the maintenance improvement programs will be presented along with actual cases encountered, the resolutions and lessons learned

  3. Maintenance Implementation Plan for the 222-S Laboratory

    International Nuclear Information System (INIS)

    Stark, T.E.

    1992-10-01

    This Maintenance Implementation Plan (MIP) has been developed for the 222-S Laboratory at Hanford. It is based on assessments of the existing maintenance program to the requirements specified by US Department of Energy (DOE) Order 4330.4A, Maintenance Management Program (DOE 1990), Chapter II, Change 3. The results of these assessments were evaluated to determine corrective actions required. The 222-S Laboratory is currently supporting the waste management, chemical processing, and environmental monitoring programs presently under Westinghouse Hanford Company (Westinghouse Hanford) responsibility. This is done through quality analytical and process chemistry services

  4. Demonstration of Sensor Data Integration Across Naval Aviation Maintenance

    Science.gov (United States)

    2018-02-01

    Concepts, Programs and Processes; Maintenance Unit Department, Division Organization; Manpower Management ; and Aviation Officers.” http...Naval Aviation Maintenance Alejandra Jolodosky and Adi Zolotov February 2018 This work was performed under Federal Government Contract...underutilized sensor data. CNA proposed a pilot program that integrated sensor data across maintenance levels to expedite repairs of aviation parts

  5. Maintenance planning for nuclear power plants

    International Nuclear Information System (INIS)

    Mattu, R.K.; Cooper, S.E.; Lauderdale, J.R.

    2004-01-01

    Maintenance planning for nuclear power plants is similar to that in other industrial plants but it is heavily influenced by regulatory rules, with consequent costs of compliance. Steps by the nuclear industry and the Nuclear Regulatory Commission to address that problem include development of guidelines for maintenance of risk-critical equipment, using PRA-based techniques to select a set of equipment that requires maintenance and reliability-centered maintenance (RCM) approaches for determining what maintenance is required. The result of the process is a program designed to ensure effective maintenance of the equipment most critical to plant safety. (author)

  6. Remote maintenance development for ITER

    International Nuclear Information System (INIS)

    Tada, Eisuke; Shibanuma, Kiyoshi

    1998-01-01

    This paper describes the overall ITER remote maintenance design concept developed mainly for in-vessel components such as diverters and blankets, and outlines the ITER R and D program to develop remote handling equipment and radiation hard components. Reactor structures inside the ITER cryostat must be maintained remotely due to DT operation, making remote handling technology basic to reactor design. The overall maintenance scenario and design concepts have been developed, and maintenance design feasibility, including fabrication and testing of full-scale in-vessel remote maintenance handling equipment and tool, is being verified. (author)

  7. Remote maintenance development for ITER

    Energy Technology Data Exchange (ETDEWEB)

    Tada, Eisuke [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment; Shibanuma, Kiyoshi

    1998-04-01

    This paper describes the overall ITER remote maintenance design concept developed mainly for in-vessel components such as diverters and blankets, and outlines the ITER R and D program to develop remote handling equipment and radiation hard components. Reactor structures inside the ITER cryostat must be maintained remotely due to DT operation, making remote handling technology basic to reactor design. The overall maintenance scenario and design concepts have been developed, and maintenance design feasibility, including fabrication and testing of full-scale in-vessel remote maintenance handling equipment and tool, is being verified. (author)

  8. Evaluating Behaviorally Oriented Aviation Maintenance Resource Management (MRM) Training and Programs: Methods, Results, and Conclusions

    Science.gov (United States)

    Taylor, James C.; Thomas, Robert L., III

    2003-01-01

    Assessment of the impact of Aviation Resource Management Programs on aviation culture and performance has compelled a considerable body of research (Taylor & Robertson, 1995; Taylor, 1998; Taylor & Patankar, 2001). In recent years new methods have been applied to the problem of maintenance error precipitated by factors such as the need for self-assessment of communication and trust. The present study - 2002 -- is an extension of that past work. This research project was designed as the conclusion of a larger effort to help understand, evaluate and validate the impact of Maintenance Resource Management (MRM) training programs, and other MRM interventions on participant attitudes, opinions, behaviors, and ultimately on enhanced safety performance. It includes research and development of evaluation methodology as well as examination of psychological constructs and correlates of maintainer performance. In particular, during 2002, three issues were addressed. First, the evaluation of two (independent & different) MRM programs for changing behaviors was undertaken. In one case we were able to further apply the approach to measuring written communication developed during 2001 (Taylor, 2002; Taylor & Thomas, 2003). Second, the MRM/TOQ surveys were made available for completion on the internet. The responses from these on-line surveys were automatically linked to a results calculator (like the one developed and described in Taylor, 2002) to aid industry users in analyzing and evaluating their local survey data on the internet. Third, the main trends and themes from our research about MRM programs over the past dozen years were reviewed.

  9. Suncor maintenance and reliability

    Energy Technology Data Exchange (ETDEWEB)

    Little, S. [Suncor Energy, Calgary, AB (Canada)

    2006-07-01

    Fleet maintenance and reliability at Suncor Energy was discussed in this presentation, with reference to Suncor Energy's primary and support equipment fleets. This paper also discussed Suncor Energy's maintenance and reliability standard involving people, processes and technology. An organizational maturity chart that graphed organizational learning against organizational performance was illustrated. The presentation also reviewed the maintenance and reliability framework; maintenance reliability model; the process overview of the maintenance and reliability standard; a process flow chart of maintenance strategies and programs; and an asset reliability improvement process flow chart. An example of an improvement initiative was included, with reference to a shovel reliability review; a dipper trip reliability investigation; bucket related failures by type and frequency; root cause analysis of the reliability process; and additional actions taken. Last, the presentation provided a graph of the results of the improvement initiative and presented the key lessons learned. tabs., figs.

  10. Application of reliability centered maintenance to Embalse NPP

    International Nuclear Information System (INIS)

    Torres, Antonio; Perdomo, Manuel; Fornero, Damian; Corchera, Roberto

    2010-01-01

    One of the most recent applications of Probabilistic Safety Analysis to Embalse NPP is the Safety Oriented Maintenance Program developed through the Reliability Centered Maintenance (RCM) methodology. Such an application was carried out by a cooperated effort between the staff of nuclear safety department of NPP and experts from Instituto Superior de Tecnologias y Ciencias Aplicadas of Cuba. So far 6 technological systems have been analyzed with important results regarding the optimization of preventive and predictive maintenance program of those systems. Any tasks of RCM were automated via MOSEG code. The results of this study were focused on the elaboration and modification of the Preventive Program, prioritization of stocks, reorientation of predictive techniques and modification in the time parameters of maintenance. (author)

  11. Optimum Maintenance Strategies for Highway Bridges

    DEFF Research Database (Denmark)

    Frangopol, Dan M.; Thoft-Christensen, Palle; Das, Parag C.

    As bridges become older and maintenance costs become higher, transportation agencies are facing challenges related to implementation of optimal bridge management programs based on life cycle cost considerations. A reliability-based approach is necessary to find optimal solutions based on minimum...... expected life-cycle costs or maximum life-cycle benefits. This is because many maintenance activities can be associated with significant costs, but their effects on bridge safety can be minor. In this paper, the program of an investigation on optimum maintenance strategies for different bridge types...... is described. The end result of this investigation will be a general reliability-based framework to be used by the UK Highways Agency in order to plan optimal strategies for the maintenance of its bridge network so as to optimize whole-life costs....

  12. A knowledge-based assistant for valve maintenance planning

    International Nuclear Information System (INIS)

    Winter, M.J.; Danofsky, R.A.; Spinrad, B.I.; Howard, K.

    1987-01-01

    A knowledge-based program is being developed to assist engineers in maintenance planning for safety related, motor-operated valves at a boiling water reactor. The purpose of this project is to develop the general framework for a prototype system that demonstrates the capabilities for diagnosing valve symptoms and prescribing corrective maintenance, completing a portion of the Corrective Maintenance Action Request (CMAR) form which must be prepared for each job, and managing an interactive valve data base. Minimizing user input and providing output in a form that is familiar to the maintenance planning engineer are important goals for the program. This paper describes the present features of the valve maintenance advisory system which is currently being tested

  13. Maintenance Of The EPS 3000 Electron Beam Machine As Part Of Quality Assurance Program For Irradiation Service At ALURTRON, Nuclear Malaysia

    International Nuclear Information System (INIS)

    Siti Aiasah Hashim; Shari Jahar; Ayub Muhammad; Azmi Ali; Abdul Basit Shafiei; Sarada Idris

    2012-01-01

    The EPS 3000 electron beam machine is the first of its kind in the country and was installed in Nuclear Malaysia in 1991. It was manufactured by Nissin High Voltage having variable energies from 0.5 to 3.0 MeV and maximum power of 90 kW. The machine is currently used for commercial irradiation that serves local industries. The Alurtron facility where the EPS is housed is an ISO 9000 certified plant. Maintenance program for the EPS is an essential part of Alurtron's Quality Assurance program. This is to ensure that the machine is in good condition and can serve the customer as the demand requires. Preventive maintenance is carried out at scheduled period based on recommendation of the machine's manufacturer. Corrective maintenance and repairs are carried out in-house by Alurtron's technical staff. Assistance may be sought from the manufacturer if necessary. Over the years, Alurtron had built its own capabilities in term of operation and maintenance of Cockcroft Walton type electron beam machine. (author)

  14. Equipment Maintenance management support system based on statistical analysis of maintenance history data

    International Nuclear Information System (INIS)

    Shimizu, S.; Ando, Y.; Morioka, T.

    1990-01-01

    Plant maintenance is recently becoming important with the increase in the number of nuclear power stations and in plant operating time. Various kinds of requirements for plant maintenance, such as countermeasures for equipment degradation and saving maintenance costs while keeping up plant reliability and productivity, are proposed. For this purpose, plant maintenance programs should be improved based on equipment reliability estimated by field data. In order to meet these requirements, it is planned to develop an equipment maintenance management support system for nuclear power plants based on statistical analysis of equipment maintenance history data. The large difference between this proposed new method and current similar methods is to evaluate not only failure data but maintenance data, which includes normal termination data and some degree of degradation or functional disorder data for equipment and parts. So, it is possible to utilize these field data for improving maintenance schedules and to evaluate actual equipment and parts reliability under the current maintenance schedule. In the present paper, the authors show the objectives of this system, an outline of this system and its functions, and the basic technique for collecting and managing of maintenance history data on statistical analysis. It is shown, from the results of feasibility tests using simulation data of maintenance history, that this system has the ability to provide useful information for maintenance and the design enhancement

  15. Machine and lubricant condition monitoring for extended equipment lifetimes and predictive maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Lukas, M; Anderson, D P [Spectro Incorporated, Littleton, Massachusetts (United States)

    1998-12-31

    Predictive maintenance has gained wide acceptance as a cost cutting strategy in modern industry. Condition monitoring by lubricant analysis is one of the basic tools of a predictive maintenance program along with vibration monitoring, performance monitoring and thermography. In today`s modern power generation, manufacturing, refinery, transportation, mining, and military operations, the cost of equipment maintenance, service, and lubricants are ever increasing. Parts, labor, equipment downtime and lubricant prices and disposal costs are a primary concern in a well run maintenance management program. Machine condition monitoring based on oil analysis has become a prerequisite in most maintenance programs. Few operations can afford not to implement a program if they wish to remain competitive, and in some cases, profitable. This presentation describes a comprehensive Machine Condition Monitoring Program based on oil analysis. Actual operational condition monitoring programs will be used to review basic components and analytical requirements. Case histories will be cited as examples of cost savings, reduced equipment downtime and increased efficiencies of maintenance programs through a well managed oil analysis program. (orig.)

  16. Machine and lubricant condition monitoring for extended equipment lifetimes and predictive maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Lukas, M.; Anderson, D.P. [Spectro Incorporated, Littleton, Massachusetts (United States)

    1997-12-31

    Predictive maintenance has gained wide acceptance as a cost cutting strategy in modern industry. Condition monitoring by lubricant analysis is one of the basic tools of a predictive maintenance program along with vibration monitoring, performance monitoring and thermography. In today`s modern power generation, manufacturing, refinery, transportation, mining, and military operations, the cost of equipment maintenance, service, and lubricants are ever increasing. Parts, labor, equipment downtime and lubricant prices and disposal costs are a primary concern in a well run maintenance management program. Machine condition monitoring based on oil analysis has become a prerequisite in most maintenance programs. Few operations can afford not to implement a program if they wish to remain competitive, and in some cases, profitable. This presentation describes a comprehensive Machine Condition Monitoring Program based on oil analysis. Actual operational condition monitoring programs will be used to review basic components and analytical requirements. Case histories will be cited as examples of cost savings, reduced equipment downtime and increased efficiencies of maintenance programs through a well managed oil analysis program. (orig.)

  17. Gentilly 2 maintenance in a total quality environment

    Energy Technology Data Exchange (ETDEWEB)

    Ross, M H; Marois, H [Hydro-Quebec, Gentilly (Canada). Gentilly Generating Station

    1993-12-31

    Comprehensive preventive maintenance programs at Gentilly-2 Nuclear Generating Station are based on a policy that seeks to balance requirements against resources. A commitment to total quality aims at performance improvement and total customer satisfaction. To improve overall performance to an annual availability factor of 90%, planned outages must be limited to 21 days per year, and the preventive maintenance program must be upgraded. A quality improvement team is involved in supporting this initiative. This team will seek to bring a new balance to the program, and eventually optimize it, using reliability-centred maintenance techniques. 24 figs.

  18. Systems Sustainability: Implementation of Enhanced Maintenance Programs at the Kurchatov Institute, the All-Russian Research Institute of Experimental physics (VNIIEF) and the All-Russian Scientific Institute for Technical Physics (VNIITF)

    International Nuclear Information System (INIS)

    Coppinger, M.; Pikula, M.; Randolph, J.D.; Windham, M.

    1999-01-01

    Implementation of quality maintenance programs is essential to enhancing sustainable continuous operations of United States funded Materials Protection, Control and Accountability (MPC and A) equipment/systems upgrades at various Russian nuclear facilities. An effective maintenance program is expected to provide assurances to both parties for achieving maximum continuous systems operations with minimum down time. To be effective, the program developed must focus on minimum down time for any part of a system. Minimum down time is realized through the implementation of a quality maintenance program that includes preventative maintenance, necessary diagnostic tools, properly trained technical staff, and an in-house inventory of required spare parts for repairing the impacted component of the system. A centralized maintenance management program is logistically essential for the success of this effort because of the large volume of MPC and A equipment/systems installed at those sites. This paper will discuss current programs and conditions at the Russian Research Center-Kurchatov Institute, the All-Russian Scientific Institute for Technical Physics and the All-Russian Research Institute of Experimental Physics and will address those steps necessary to implement an upgraded program at those sites

  19. 40 CFR 68.56 - Maintenance.

    Science.gov (United States)

    2010-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 2 Prevention Program § 68.56 Maintenance. (a) The owner or operator shall prepare and implement procedures to maintain the on-going mechanical integrity of the process...

  20. 25 CFR 170.812 - What is emergency maintenance?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What is emergency maintenance? 170.812 Section 170.812 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.812 What is emergency maintenance? Emergency maintenance is work that...

  1. Systematization of Angra-1 operation attendance - Maintenance and periodic testings

    International Nuclear Information System (INIS)

    Furieri, E.B.; Carvalho Bruno, N. de; Salaverry, N.A.

    1988-01-01

    A maintenance analysis, their types and their functions for the safety of nuclear power plants is done. Programs and present trends in the reactor maintenance, as well as the maintenance program and periodic tests of Angra I, are analysed. The necessities of safety analysis and a systematization for maintenance attendance are discussed and the periodic testing as well as the attendance of international experience. (M.C.K.) [pt

  2. 49 CFR 214.341 - Roadway maintenance machines.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Roadway maintenance machines. 214.341 Section 214... Roadway maintenance machines. (a) Each employer shall include in its on-track safety program specific provisions for the safety of roadway workers who operate or work near roadway maintenance machines. Those...

  3. Control maintenance training program for special safety systems at Bruce B

    International Nuclear Information System (INIS)

    Reinwald, G.

    1997-01-01

    It was recognized from the early days of commissioning of Bruce B that Control Maintenance staff would require a level of expertise to be able to maintain Special Safety Systems in proper running order. In the early 80's this was achieved through hands on experience during the original commissioning, troubleshooting and placing of the various systems in service. Control maintenance procedures were developed and implemented as the new systems came available for commissioning, as were operating manuals,training manuals etc. Under the development of the Maintenance Manager, a Conduct of Maintenance section was organized. One of the responsibilities of this section was to develop a series of Maintenance Administrative Procedures (MAPs) that set the standards for maintenance activities including training

  4. Road Maintenance and Rehabilitation Program Using Functional and Structural Assessment

    Science.gov (United States)

    Setianingsih, A. I.; Sangaji, S.; Setyawan, A.

    2017-02-01

    Road sector development policy in Bangka Belitung emphasis on equitable development, which is opening up new areas for industrial development zones of potential marine and coastal tourism, so that having an impact on the budget priority to build a new road. This led to a minimal budget provided for the maintenance of the existing road. This study aimed to evaluate the condition of the pavement both functionally and structurally, the growth of traffic density and the availability of existing road maintenance costs. Then, to analyze the influence of existing road conditions, traffic density and road maintenance costs to the type of road maintenance management. The results are compared with the results of the existing maintenance conducted by the Public Works Department of Bangka Belitung province. Evaluation of pavement conditions consists of visual assessment of pavement condition using IRI, pavement condition assessment functionally with deflection method using test data tool Benkelman Beam (BB) and the actual traffic load. IRI value, deflections and traffic growth gained from years 2011-2015 subsequently created regression models to obtain the relationship and the correlation coefficient. The analysis showed that using the same relative magnitude of the budget from 2011 to 2015, giving priority to the maintenance of the road with good conditions capable of providing the road with a steady state of 100%. Recommendations can be given that maintain the road with good conditions reflecting that preservation provide maximum results with the more efficient maintenance cost.

  5. Comparing Weight Loss-Maintenance Outcomes of a Worksite-Based Lifestyle Program Delivered via DVD and Face-to-Face: A Randomized Trial.

    Science.gov (United States)

    Ing, Claire Townsend; Miyamoto, Robin E S; Fang, Rui; Antonio, Mapuana; Paloma, Diane; Braun, Kathryn L; Kaholokula, Joseph Keawe'aimoku

    2018-03-01

    Native Hawaiians and other Pacific Islanders have high rates of overweight and obesity compared with other ethnic groups in Hawai'i. Effective weight loss and weight loss-maintenance programs are needed to address obesity and obesity-related health inequities for this group. Compare the effectiveness of a 9-month, worksite-based, weight loss-maintenance intervention delivered via DVD versus face-to-face in continued weight reduction and weight loss maintenance beyond the initial weight loss phase. We tested DVD versus face-to-face delivery of the PILI@Work Program's 9-month, weight loss-maintenance phase in Native Hawaiian-serving organizations. After completing the 3-month weight loss phase, participants ( n = 217) were randomized to receive the weight loss-maintenance phase delivered via trained peer facilitators or DVDs. Participant assessments at randomization and postintervention included weight, height, blood pressure, physical functioning, exercise frequency, and fat intake. Eighty-three face-to-face participants were retained at 12 months (74.1%) compared with 73 DVD participants (69.5%). There was no significant difference between groups in weight loss or weight loss maintenance. The number of lessons attended in Phase 1 of the intervention (β = 0.358, p = .022) and baseline systolic blood pressure (β = -0.038, p = .048) predicted percent weight loss at 12 months. Weight loss maintenance was similar across groups. This suggests that low-cost delivery methods for worksite-based interventions targeting at-risk populations can help address obesity and obesity-related disparities. Additionally, attendance during the weight loss phase and lower baseline systolic blood pressure predicted greater percent weight loss during the weight loss-maintenance phase, suggesting that early engagement and initial physical functioning improve long-term weight loss outcomes.

  6. Development of a methodology for maintenance optimization at Kozloduy NPP

    International Nuclear Information System (INIS)

    Kitchev, E.

    1997-01-01

    The paper presents the overview of a project for development of an applicable strategy and methods for Kozloduy NPP (KNPP) to optimize its maintenance program in order to meet the current risk based maintenance requirements. The strategy in a format of Integrated Maintenance Program (IMP) manual will define the targets of the optimization process, the major stages and elements of this process and their relationships. IMP embodies the aspects of the US NRC Maintenance Rule compliance and facilitates the integration of KNPP programs and processes which impact the plant maintenance and safety. The methods in a format of IMP Instructions (IM-PI) will define how the different IMP stages can be implemented and the IMP targets can be achieved at KNPP environment. (author). 8 refs

  7. FY 1994 annual summary report of the surveillance and maintenance activities for the Oak Ridge National Laboratory Environmental Restoration Program

    International Nuclear Information System (INIS)

    1994-11-01

    The Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Surveillance and Maintenance (S and M) Program was initiated to manage former waste management and environmental research sites contaminated with radioactive materials and/or hazardous chemicals. The S and M Program is responsible for managing designated sites/facilities from the end of their operating lives until final disposition or site stabilization. To effectively manage and perform the various S and M Program responsibilities, five summary-level work breakdown structure (WBS) elements have been established: S and M Preliminary Investigations, Special Projects, Routine S and M, Inactive Groundwater Wells, and Project Management. Routine S and M activities were conducted as scheduled throughout fiscal years (FY) 1994 at applicable inactive waste management (WM) and other contaminated areas. Overall, the ER S and M Program maintains 47 facilities, performs vegetation maintenance on approximately 230 acres, maintains 54 inactive tanks, and provides overall site management on over 700 acres. In addition to the routine S and M activities, detailed site inspections were conducted at established frequencies on appropriate sites in the ER S and M Program. This document provides a summary of the FY 1994 ORNL ER S and M Program accomplishments

  8. Establishing a predictive maintenance (PdM) program at the Hanford Site

    International Nuclear Information System (INIS)

    Murray, W.A.; Winslow, R.G.

    1994-02-01

    The production reactors have been shut down for some time. But for the rest of the site, there is currently about 16,000 people engaged in a multi-billion dollar effort to safely process wastes which have been stored at the site since the 1940's. This effort also includes demolition of some older facilities and environmental restoration of much of the site. This is expected to take approximately 30 to 40 years. The concept of a site-wide predictive maintenance (PdM) program began to form in early 1993. Several informal studies showed that the stand alone predictive maintenance groups which had prevailed on site to date were less than 15% effective at trending equipment conditions and predicting failures. To improve the effectiveness of PdM within the company, an engineering analysis by Rick Winslow confirmed that utilization of software networking technology which was now available would significantly overcome many of these built in handicaps. A site-wide predictive maintenance network would make PdM technology accessible to all of the areas and facilities at the site regardless of geographical distances and company division lines. Site resident vibration experts can easily be located and provide consultations on the network. However, it was recognized that strong leadership and management skills would be required within each of the two organizations for effective implementation. To start this process, a letter of understanding and agreement between the facilities and Tank Farm divisions was drafted and endorsed by company management. The agreement assigned the primary responsibility of acquiring the network software and licensee to the Tank Farms division. The acquisition and installation of the network server would be the responsibility of the facilities division. This paper describes the rest of the network development and implementation process

  9. Ohio Advanced Energy Manufacturing Center

    Energy Technology Data Exchange (ETDEWEB)

    Kimberly Gibson; Mark Norfolk

    2012-07-30

    The program goal of the Ohio Advanced Energy Manufacturing Center (OAEMC) is to support advanced energy manufacturing and to create responsive manufacturing clusters that will support the production of advanced energy and energy-efficient products to help ensure the nation's energy and environmental security. This goal cuts across a number of existing industry segments critical to the nation's future. Many of the advanced energy businesses are starting to make the transition from technology development to commercial production. Historically, this transition from laboratory prototypes through initial production for early adopters to full production for mass markets has taken several years. Developing and implementing manufacturing technology to enable production at a price point the market will accept is a key step. Since these start-up operations are configured to advance the technology readiness of the core energy technology, they have neither the expertise nor the resources to address manufacturing readiness issues they encounter as the technology advances toward market entry. Given the economic realities of today's business environment, finding ways to accelerate this transition can make the difference between success and failure for a new product or business. The advanced energy industry touches a wide range of industry segments that are not accustomed to working together in complex supply chains to serve large markets such as automotive and construction. During its first three years, the Center has catalyzed the communication between companies and industry groups that serve the wide range of advanced energy markets. The Center has also found areas of common concern, and worked to help companies address these concerns on a segment or industry basis rather than having each company work to solve common problems individually. EWI worked with three industries through public-private partnerships to sew together disparate segments helping to promote

  10. Development of blanket remote maintenance system

    International Nuclear Information System (INIS)

    Kakudate, Satoshi; Nakahira, Masataka; Oka, Kiyoshi; Taguchi, Kou

    1998-01-01

    ITER in-vessel components such as blankets are scheduled maintenance components, including complete shield blanket replacement for breeding blankets. In-vessel components are activated by 14 MeV neutrons, so blanket maintenance requires remote handling equipment and tools able to handle heavy payloads of about 4 tons within a positioning accuracy of 2 mm under intense gamma radiation. To facilitate remote maintenance, blankets are segmented into 730 modules and rail-mounted vehicle remote maintenance was developed. According to the ITER R and D program, critical technology related to blanket maintenance was developed extensively through joint efforts of the Japan, EU, and U.S. home teams. This paper summarizes current blanket maintenance technology conducted by the Japan Home Team, including development of full-scale remote handling equipment and tools for blanket maintenance. (author)

  11. Development of blanket remote maintenance system

    Energy Technology Data Exchange (ETDEWEB)

    Kakudate, Satoshi; Nakahira, Masataka; Oka, Kiyoshi; Taguchi, Kou [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-04-01

    ITER in-vessel components such as blankets are scheduled maintenance components, including complete shield blanket replacement for breeding blankets. In-vessel components are activated by 14 MeV neutrons, so blanket maintenance requires remote handling equipment and tools able to handle heavy payloads of about 4 tons within a positioning accuracy of 2 mm under intense gamma radiation. To facilitate remote maintenance, blankets are segmented into 730 modules and rail-mounted vehicle remote maintenance was developed. According to the ITER R and D program, critical technology related to blanket maintenance was developed extensively through joint efforts of the Japan, EU, and U.S. home teams. This paper summarizes current blanket maintenance technology conducted by the Japan Home Team, including development of full-scale remote handling equipment and tools for blanket maintenance. (author)

  12. Tandem mirror next step: remote maintenance

    International Nuclear Information System (INIS)

    Doggett, J.N.; Damm, C.C.; Hanson, C.L.

    1980-01-01

    This study of the next proposed experiment in the Mirror Fusion Program, the Tandem Mirror Next Step (TMNS), has included serious consideration of the maintenance requirements of such a large source of high energy neutrons with its attendant throughput of tritium. Although maintenance will be costly in time and money, our conclusion is that with careful attention to a design for maintenance plan such a device can be reliably operated

  13. Aging based maintenance and reinvestment scheduling of electric distribution

    Energy Technology Data Exchange (ETDEWEB)

    Korpijarvi, J.

    2012-07-01

    The maintenance of electric distribution network is a topical question for distribution system operators because of increasing significance of failure costs. In this dissertation the maintenance practices of the distribution system operators are analyzed and a theory for scheduling maintenance activities and reinvestment of distribution components is created. The scheduling is based on the deterioration of components and the increasing failure rates due to aging. The dynamic programming algorithm is used as a solving method to maintenance problem which is caused by the increasing failure rates of the network. The other impacts of network maintenance like environmental and regulation reasons are not included to the scope of this thesis. Further the tree trimming of the corridors and the major disturbance of the network are not included to the problem optimized in this thesis. For optimizing, four dynamic programming models are presented and the models are tested. Programming is made in VBA-language to the computer. For testing two different kinds of test networks are used. Because electric distribution system operators want to operate with bigger component groups, optimal timing for component groups is also analyzed. A maintenance software package is created to apply the presented theories in practice. An overview of the program is presented (orig.)

  14. Maintenance Issues in Long Term Operation of Nuclear Power Plant

    International Nuclear Information System (INIS)

    Contri, P.; Bieth, M.; Rieg, C.

    2006-01-01

    Due to current social and economical framework, in last years many nuclear power plant owners started a program for the Long Term Operation (LTO)/PLEX (Plant Life Extension) of their older nuclear facilities. This process has many nuclear safety implications, other than strategic and political ones. The need for tailoring the available safety assessment tools to such applications has become urgent in recent years and triggered many research actions. The review of regular maintenance and ageing management programs are tools widely used in LTO/PLEX context in many Countries. However, most of these tools are rather general and in many cases they need reshaping in an LTO/PLEX framework before application, with focus to the safety implications of the LTO/PLEX. Many Countries and plants radically modified their maintenance rules towards a condition based approach as a precondition for the implementation of LTO/PLEX programs. In 2004 a network of European Organisations operating Nuclear Power Plants, SENUF, under the coordination of the JRC-IE, carried out an extensive questionnaire on maintenance practice in their facilities aiming at capturing the aspects of the maintenance programs where research is mostly needed. This paper uses some results of the questionnaire, which was not oriented to LTO/PLEX, to draw some conclusions on how the current maintenance programs could support a potential LTO/PLEX, among the other programs running at NPPs. In this sense, it is spin-off of the SENUF WG on maintenance. The paper aims at identifying the technical attributes of the maintenance programs more directly affecting the decision for a long-term safe operation of a nuclear facility, the issues related to their implementation and safety review. The paper includes an analysis of the questionnaire circulated among the SENUF participants and a discussion on the implications of optimised maintenance programs in existing plants. Some examples at WWER plants taken by sources other than

  15. Optimization of maintenance programme at Daya Bay Nuclear Power Station based on RCM analysis results

    International Nuclear Information System (INIS)

    Liu Min

    2003-01-01

    This paper begins with an introduction to Guangdong Daya Bay Nuclear Power Station (GNPS) and gives a simple introduction to the operations and maintenance documentation system at GNPS. It then will review the maintenance program guidelines base and the associated problems prior to the application of reliability centered maintenance (RCM). How RCM was implemented at GNPS, how the results of RCM analysis were used to optimize the maintenance program and test program, and what is the interface between RCM and the existing maintenance program will be shown. Next, it will show the successful implementation of RCM at GNPS resulted in the following changes: A new understanding of equipment failure challenges operations and maintenance beliefs, maintenance concepts undergo a large change, maintenance program and periodic testing program are continuously modified and optimized, new on-condition maintenance technologies are introduced, non-productive scheduled overhauls are discarded, maintenance costs are effectively controlled, maintenance appropriateness has improved, management of hidden failures is more effective and timely. It will show the benefit of greater equipment reliability brought about by all of these changes, which in turn increases the reliability and safety of the entire power station. (author)

  16. Maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Migaud, D.; Hutin, J.P.; Jouette, I.; Eymond, P.; Devie, P.; Cudelou, C.; Magnier, S.; Frydman, M.

    2016-01-01

    This document gathers different articles concerning the maintenance of the French nuclear power plants. The first article analyses the impact of the recent law on the energetic transition that sets the share of nuclear power at 50% of the electricity produced by 2025. A consequence may be the decommissioning of 17 to 20 reactors by 2025 and the huge maintenance program called 'Grand Carenage' whose aim is to extend operating life over 40 years will have to be re-considered in order to avoid useless expenses. The second article shows that in 2015 the French nuclear reactor fleet got very good results in terms of availability and safety. There were 49 scheduled outages and among them some ended ahead of time. The third article describes the specificities of the maintenance of a nuclear power plant, for instance the redundancy of some systems implies that maintenance has to deal with systems that have never functioned but must be ready to operate at any moment. Another specificity is the complexity of a nuclear power plant that implies an essential phase of preparation for maintenance operations. Because of safety requirements any maintenance operation has to be controlled, checked and may provide feedback. The fourth article presents the 'Grand Carenage' maintenance program that involves the following operations: the replacement of steam generators, the re-tubing of condensers, the replacement of the filtering drums used for cooling water, the testing of the reactor building, the hydraulic test of the primary circuit and the inspection of the reactor vessel. The fifth article focuses on the organization of the work-site for maintenance operations and the example of the Belleville-sur-Loire is described in the sixth article. Important maintenance operations like 'Grand Carenage' requires a strong collaboration with a network of specialized enterprises and as no reactor (except Flamanville EPR) is being built in France, maintenance

  17. Proceedings of the third international conference on CANDU maintenance

    International Nuclear Information System (INIS)

    1995-01-01

    The third international conference on Candu maintenance included sessions on the following topics: predictive maintenance, reliability improvements, steam generator monitoring, tools and instrumentation, valve performance, fuel channel inspection and maintenance, steam generator maintenance, environmental qualification, predictive maintenance, instrumentation and control, steam generator cleaning, decontamination and radiation protection, inspection techniques, maintenance program strategies and valve packing experience, remote tooling/ robotics and fuel handling. The individual papers have been abstracted separately

  18. Proceedings of the third international conference on CANDU maintenance

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    The third international conference on Candu maintenance included sessions on the following topics: predictive maintenance, reliability improvements, steam generator monitoring, tools and instrumentation, valve performance, fuel channel inspection and maintenance, steam generator maintenance, environmental qualification, predictive maintenance, instrumentation and control, steam generator cleaning, decontamination and radiation protection, inspection techniques, maintenance program strategies and valve packing experience, remote tooling/ robotics and fuel handling. The individual papers have been abstracted separately.

  19. Equipment reliability process improvement and preventive maintenance optimization

    International Nuclear Information System (INIS)

    Darragi, M.; Georges, A.; Vaillancourt, R.; Komljenovic, D.; Croteau, M.

    2004-01-01

    The Gentilly-2 Nuclear Power Plant wants to optimize its preventive maintenance program through an Integrated Equipment Reliability Process. All equipment reliability related activities should be reviewed and optimized in a systematic approach especially for aging plants such as G2. This new approach has to be founded on best practices methods with the purpose of the rationalization of the preventive maintenance program and the performance monitoring of on-site systems, structures and components (SSC). A rational preventive maintenance strategy is based on optimized task scopes and frequencies depending on their applicability, critical effects on system safety and plant availability as well as cost-effectiveness. Preventive maintenance strategy efficiency is systematically monitored through degradation indicators. (author)

  20. Proceedings of the fourth international conference on CANDU maintenance

    International Nuclear Information System (INIS)

    1997-01-01

    These proceedings record the information presented at the 4th International Conference on CANDU Maintenance held November 16-18,1997 in Toronto, Canada. The papers for these proceedings were prepared on component maintenance, human performance, steam generator leak detection, fuel channel inspections, rotating equipment maintenance, surveillance programs, inspection techniques, valve maintenance, steam generator repairs and performance, reactor aging management and preventative maintenance

  1. Proceedings of the fourth international conference on CANDU maintenance

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-01

    These proceedings record the information presented at the 4th International Conference on CANDU Maintenance held November 16-18,1997 in Toronto, Canada. The papers for these proceedings were prepared on component maintenance, human performance, steam generator leak detection, fuel channel inspections, rotating equipment maintenance, surveillance programs, inspection techniques, valve maintenance, steam generator repairs and performance, reactor aging management and preventative maintenance.

  2. Airline experience with reliability-centered maintenance

    International Nuclear Information System (INIS)

    Matteson, T.D.

    1985-01-01

    Reliability-Centered Maintenance is a process for developing preventive maintenance programs. Its concepts evolved from the post WWII experience of the airline community. Its genesis was in a paper by F. Stanley Nowlan and Thomas D. Matteson of United Airlines for the American Institute of Aeronautics and Astronautics in 1967. Its first application was to the Boeing 747. It has subsequently been adopted by the FAA and the Department of Defense and applied to many new transport and military aircraft. Its objective is applicable and effective preventive maintenance and it has proven to be a highly effective replacement for the prior intuitive processes for selective preventive maintenance tasks. It focuses on system functions, functional failures, then dominant failure modes and effects. It then uses a decision tree to classify failure criticality and identify applicable and effective tasks. The result is a program focused on maintaining inherent safety and reliability at minimum cost. (orig.)

  3. Airline experience with reliability-centered maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Matteson, T.D.

    1985-11-01

    Reliability-Centered Maintenance is a process for developing preventive maintenance programs. Its concepts evolved from the post WWII experience of the airline community. Its genesis was in a paper by F. Stanley Nowlan and Thomas D. Matteson of United Airlines for the American Institute of Aeronautics and Astronautics in 1967. Its first application was to the Boeing 747. It has subsequently been adopted by the FAA and the Department of Defense and applied to many new transport and military aircraft. Its objective is applicable and effective preventive maintenance and it has proven to be a highly effective replacement for the prior intuitive processes for selective preventive maintenance tasks. It focuses on system functions, functional failures, then dominant failure modes and effects. It then uses a decision tree to classify failure criticality and identify applicable and effective tasks. The result is a program focused on maintaining inherent safety and reliability at minimum cost. (orig.).

  4. Scheduling and recording of reactor maintenance and testing by computer

    International Nuclear Information System (INIS)

    Gray, P.L.

    1975-01-01

    The use of a computer program, Maintenance Information and Control (MIAC), at the Savannah River Laboratory (SRL) assists a small operating staff in maintaining three research reactors and a subcritical facility. The program schedules and defines preventive maintenance, schedules required periodic tests, logs repair and cost information, specifies custodial and service responsibilities, and provides equipment maintenance history, all with a minimum of record-keeping

  5. A randomized controlled trial of interim methadone maintenance.

    Science.gov (United States)

    Schwartz, Robert P; Highfield, David A; Jaffe, Jerome H; Brady, Joseph V; Butler, Carol B; Rouse, Charles O; Callaman, Jason M; O'Grady, Kevin E; Battjes, Robert J

    2006-01-01

    Effective alternatives to long waiting lists for entry into methadone hydrochloride maintenance treatment are needed to reduce the complications of continuing heroin dependence and to increase methadone treatment entry. To compare the effectiveness of interim methadone maintenance with that of the usual waiting list condition in facilitating methadone treatment entry and reducing heroin and cocaine use and criminal behavior. Randomized, controlled, clinical trial using 2 conditions, with treatment assignment on a 3:2 basis to interim maintenance-waiting list control. A methadone treatment program in Baltimore. A total of 319 individuals meeting the criteria for current heroin dependence and methadone maintenance treatment. Participants were randomly assigned to either interim methadone maintenance, consisting of an individually determined methadone dose and emergency counseling only for up to 120 days, or referral to community-based methadone treatment programs. Entry into comprehensive methadone maintenance therapy at 4 months from baseline; self-reported days of heroin use, cocaine use, and criminal behavior; and number of urine drug test results positive for heroin and cocaine at the follow-up interview conducted at time of entry into comprehensive methadone treatment (or at 4 months from baseline for participants who did not enter regular treatment). Significantly more participants assigned to the interim methadone maintenance condition entered comprehensive methadone maintenance treatment by the 120th day from baseline (75.9%) than those assigned to the waiting list control condition (20.8%) (Pmethadone maintenance results in a substantial increase in the likelihood of entry into comprehensive treatment, and is an effective means of reducing heroin use and criminal behavior among opioid-dependent individuals awaiting entry into a comprehensive methadone treatment program.

  6. Reliability Centered Maintenance for Savannah River Site's interim waste management facilities

    International Nuclear Information System (INIS)

    Hauer, K.A.; Wilson, J.F.

    1992-01-01

    The application of Reliability Centered Maintenance (RCM) has been shown to be an effective means to optimize maintenance programs or to establish new programs. The key to success of any RCM program is to customize the methodology to meet the specific needs of the implementing organization. This paper discusses how RCM is being used to establish the preventive maintenance program and how the resulting system data is being used to support the Technical Baseline reconstitution effort for the interim Waste Management Division of Westinghouse Savannah River Company (WSRC)

  7. Good practices for effective maintenance to manage aging at NPPs

    International Nuclear Information System (INIS)

    Scott, W.B.; Enderlin, W.I.; Levy, I.S.

    1989-01-01

    The Nuclear Regulatory Commission's Office of Nuclear Regulatory Research is sponsoring this effort to study maintenance as it relates to aging, under the Nuclear Plant Aging Research (NPAR). Maintenance is the primary means of combating and correcting the effects of aging degradation at nuclear power plants. Maintenance effectiveness directly affects the safety of nuclear power plants. Several recent plant events have shown that improper maintenance or a lack of maintenance can be a significant contributory cause of plant incidents (e.g., transients at Rancho Seco and Davis Besse, and the Salem anticipated transient without scram event). In these, and other events, safety related plant equipment functions have been impaired by poor maintenance practices or a lack of maintenance on the specific equipment or in ancillary equipment that affects the ability of the safety related equipment to function. In some cases, the ancillary equipment has been nonsafety-related equipment, or balance-of-plant equipment that has not received adequate maintenance attention. In addition to the potential for causing safety significant plant transients, poor or lacking maintenance may allow the licensing basis of the plant to be eroded without detection. In some cases, time-related aging degradation of equipment that has not been detected, corrected or managed by the maintenance program has been a significant contributory factor. The NPAR program has developed significant information on aging degradation, detection, mitigation, and correction practices for safety-significant structures, systems and components that can be factored into maintenance programs and their effectiveness

  8. Remote maintenance development for ITER

    International Nuclear Information System (INIS)

    Tada, Eisuke; Shibanuma, Kiyoshi

    1997-01-01

    This paper both describes the overall design concept of the ITER remote maintenance system, which has been developed mainly for use with in-vessel components such as divertor and blanket, and outlines of the ITER R and D program, which has been established to develop remote handling equipment/tools and radiation hard components. In ITER, the reactor structures inside cryostat have to be maintained remotely because of activation due to DT operation. Therefore, remote-handling technology is fundamental, and the reactor-structure design must be made consistent with remote maintainability. The overall maintenance scenario and design concepts of the required remote handling equipment/tools have been developed according to their maintenance classification. Technologies are also being developed to verify the feasibility of the maintenance design and include fabrication and testing of a fullscale remote-handling equipment/tools for in-vessel maintenance. (author)

  9. Guide for generic application of Reliability Centered Maintenance (RCM) recommendations

    International Nuclear Information System (INIS)

    Schwan, C.A.; Toomey, G.E.; Morgan, T.A.; Darling, S.S.

    1991-02-01

    Previously completed reliability centered maintenance (RCM) studies form the basis for developing or refining a preventive maintenance program. This report describes a generic methodology that will help utilities optimize nuclear plant maintenance programs using RCM techniques. This guide addresses the following areas: history of the generic methodology development process, and use of the generic methodology for conducting system-to-system and component-to-component evaluations. 2 refs., 2 figs., 5 tabs

  10. Development of divertor remote maintenance system

    Energy Technology Data Exchange (ETDEWEB)

    Takeda, Nobukazu; Oka, Kiyoshi; Akou, Kentaro; Takiguchi, Yuji [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-04-01

    The ITER divertor is categorized as a scheduled maintenance component because of extreme heat and particle loads it is exposed to by plasma. It is also highly activated by 14 MeV neutrons. Reliable remote handling equipment and tools are required for divertor maintenance under intense gamma radiation. To facilitate remote maintenance, the divertor is segmented into 60 cassettes, and each cassette weighing about 25 tons and maintained and replaced through four maintenance ports each 90 degrees. Divertor cassettes must be transported toroidally and radially for replacement through maintenance ports. Remote handling involving cassette movers and carriers for toroidal and radial transport has been developed. Under the ITER R and D program, technology critical to divertor cassette maintenance is being developed jointly by Japan, E.U., and U.S. home teams. This paper summarizes divertor remote maintenance design and the status of technology development by the Japan Home Team. (author)

  11. Development of divertor remote maintenance system

    International Nuclear Information System (INIS)

    Takeda, Nobukazu; Oka, Kiyoshi; Akou, Kentaro; Takiguchi, Yuji

    1998-01-01

    The ITER divertor is categorized as a scheduled maintenance component because of extreme heat and particle loads it is exposed to by plasma. It is also highly activated by 14 MeV neutrons. Reliable remote handling equipment and tools are required for divertor maintenance under intense gamma radiation. To facilitate remote maintenance, the divertor is segmented into 60 cassettes, and each cassette weighing about 25 tons and maintained and replaced through four maintenance ports each 90 degrees. Divertor cassettes must be transported toroidally and radially for replacement through maintenance ports. Remote handling involving cassette movers and carriers for toroidal and radial transport has been developed. Under the ITER R and D program, technology critical to divertor cassette maintenance is being developed jointly by Japan, E.U., and U.S. home teams. This paper summarizes divertor remote maintenance design and the status of technology development by the Japan Home Team. (author)

  12. ATTENTION MAINTENANCE IN NOVICE DRIVERS: ASSESSMENT AND TRAINING

    OpenAIRE

    Pradhan, Anuj; Masserang, Kathleen M.; Divekar, Gautam; Reagan, Ian; Thomas, F. Dennis; Blomberg, Richard; Pollatsek, Alexander; Fisher, Donald

    2009-01-01

    All programs assessing attention maintenance inside the vehicle have required eye trackers and either a driving simulator or a specially equipped field vehicle. Ideally, one would like a way to assess attention maintenance that could be implemented on a desktop PC. Additionally, one would like to have a program that could be used to train novice drivers to maintain their attention more safely on the forward roadway. An experiment was run (a) to determine whether a program FOCAL (Focused Conce...

  13. 40 CFR 160.63 - Maintenance and calibration of equipment.

    Science.gov (United States)

    2010-07-01

    ...) PESTICIDE PROGRAMS GOOD LABORATORY PRACTICE STANDARDS Equipment § 160.63 Maintenance and calibration of..., maintenance, testing, calibration, and/ or standardization of equipment, and shall specify, when appropriate... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Maintenance and calibration of...

  14. Nuclear instrument maintenance - problems, solutions, and obstacles

    International Nuclear Information System (INIS)

    Vuister, P.H.

    1983-01-01

    In 200 laboratories of South-East Asia, Latin America and Africa a survey was made of the state of instrumentation for nuclear medicine. The principal cause of failures and defects was inadequate quality control and preventive maintenance. On the basis of the survey coordinated research programs were compiled for the maintenance of nuclear instruments. The four principal points of the programs are: to safeguard quality and stable electric power supplies for the instruments, to safeguard permanent temperature and humidity in the environment in which the equipment is operated, effective maintenance, and training of personnel. In the years 1981 and 1982, 14 local training courses were run in which emphasis was put on practicals and tests in mechanics and electronics

  15. TPM and autonomous maintenance: case study in a metal mechanic company

    Directory of Open Access Journals (Sweden)

    Norberto Carvalho Biehl

    2015-12-01

    Full Text Available The purpose of this article was to describe a case of autonomous maintenance implementation in a pilot area of a metal mechanical industry company. The TPM – Total Productive Maintenance is a managerial technology that can help companies to reduce failures and breakages of machines. One of the most important issues of TPM is autonomous maintenance. The method of research was the case study. A program of twelve points was structured and adopted as stand-alone maintenance deployment guide. The program began in a pilot area, including three machining centers. The main results of the pilot program were: increasing by more than 700% the Mean Time between Failure, reducing by more than 40% in the Mean Time to Repair, as well as the consequent increase of more than five percentage points on the availability of the three machines and almost 60% reduction in the cost of maintenance materials. The main conclusion was that the TPM, and in particular the autonomous maintenance, can increase the efficiency of maintenance as strategic factor, which enhances the competitiveness of manufacturing in industrial companies.

  16. Methadone Maintenance as Last Resort

    DEFF Research Database (Denmark)

    Järvinen, Margaretha; Miller, Gale

    2010-01-01

    Drawing on qualitative interviews with drug addicts in Copenhagen, Denmark, this article offers a phenomenological reading of a methadone maintenance program. The program is set within the principles of harm reduction, meaning that its aim is not to cure the participants’ addiction but to keep them...

  17. Early warning indicators for HIV drug resistance in Cameroon during the year 2010.

    Directory of Open Access Journals (Sweden)

    Serge C Billong

    Full Text Available BACKGROUND: Rapid scale-up of antiretroviral therapy (ART in resource-limited settings is accompanied with an increasing risk of HIV drug resistance (HIVDR, which in turn could compromise the performance of national ART rollout programme. In order to sustain the effectiveness of ART in a resource-limited country like Cameroon, HIVDR early warning indicators (EWI may provide relevant corrective measures to support the control and therapeutic management of AIDS. METHODS: A retrospective study was conducted in 2010 among 40 ART sites (12 Approved Treatment Centers and 28 Management Units distributed over the 10 regions of Cameroon. Five standardized EWIs were selected for the evaluation using data from January through December, among which: (1 Good ARV prescribing practices: target = 100%; (2 Patient lost to follow-up: target ≤ 20%; (3 Patient retention on first line ART: target ≥ 70%; (4 On-time drug pick-up: target ≥ 90%; (5 ARV drug supply continuity: target = 100%. Analysis was performed using a Data Quality Assessment tool, following WHO protocol. RESULTS: THE NUMBER OF SITES ATTAINING THE REQUIRED PERFORMANCE ARE: 90% (36/40 for EWI(1, 20% (8/40 for EWI(2; 20% (8/40 for EWI(3; 0% (0/37 for EWI(4; and 45% (17/38 for EWI 5. ARV prescribing practices were in conformity with the national guidelines in almost all the sites, whereas patient adherence to ART (EWI(2, EWI(3, and EWI(4 was very low. A high rate of patients was lost-to-follow-up and others failing first line ART before 12 months of initiation. Discontinuity in drug supply observed in about half of the sites may negatively impact ARV prescription and patient adherence. These poor ART performances may also be due to low number of trained staff and community disengagement. CONCLUSIONS: The poor performance of the national ART programme, due to patient non-adherence and drug stock outs, requires corrective measures to limit risks of HIVDR emergence in Cameroon.

  18. Early warning indicators for HIV drug resistance in Cameroon during the year 2010.

    Science.gov (United States)

    Billong, Serge C; Fokam, Joseph; Nkwescheu, Armand S; Kembou, Etienne; Milenge, Pascal; Tsomo, Zephirin; Dion, Grace Ngute; Aghokeng, Avelin F; Mpoudi, Eitel N; Ndumbe, Peter M; Colizzi, Vittorio; Elat Nfetam, Jean B

    2012-01-01

    Rapid scale-up of antiretroviral therapy (ART) in resource-limited settings is accompanied with an increasing risk of HIV drug resistance (HIVDR), which in turn could compromise the performance of national ART rollout programme. In order to sustain the effectiveness of ART in a resource-limited country like Cameroon, HIVDR early warning indicators (EWI) may provide relevant corrective measures to support the control and therapeutic management of AIDS. A retrospective study was conducted in 2010 among 40 ART sites (12 Approved Treatment Centers and 28 Management Units) distributed over the 10 regions of Cameroon. Five standardized EWIs were selected for the evaluation using data from January through December, among which: (1) Good ARV prescribing practices: target = 100%; (2) Patient lost to follow-up: target ≤ 20%; (3) Patient retention on first line ART: target ≥ 70%; (4) On-time drug pick-up: target ≥ 90%; (5) ARV drug supply continuity: target = 100%. Analysis was performed using a Data Quality Assessment tool, following WHO protocol. THE NUMBER OF SITES ATTAINING THE REQUIRED PERFORMANCE ARE: 90% (36/40) for EWI(1), 20% (8/40) for EWI(2); 20% (8/40) for EWI(3); 0% (0/37) for EWI(4); and 45% (17/38) for EWI 5. ARV prescribing practices were in conformity with the national guidelines in almost all the sites, whereas patient adherence to ART (EWI(2), EWI(3), and EWI(4)) was very low. A high rate of patients was lost-to-follow-up and others failing first line ART before 12 months of initiation. Discontinuity in drug supply observed in about half of the sites may negatively impact ARV prescription and patient adherence. These poor ART performances may also be due to low number of trained staff and community disengagement. The poor performance of the national ART programme, due to patient non-adherence and drug stock outs, requires corrective measures to limit risks of HIVDR emergence in Cameroon.

  19. Excellence through maintenance mastering

    International Nuclear Information System (INIS)

    Lamarche, M.; Guillot, M.; Monier, M.

    1987-01-01

    To improve the overall availability factor of nuclear power plants you have to cut either the forced outage role and the planned outage time or you need to reduce simultaneously the failures and the efforts devoted to avoiding them. Among other results, this goal leads to a decrease in the number of real or anticipated problems. Electricite de France policy, in this matter, is to focus on decreasing the compoents' maintenance needs through a comprehensive modification program, targeted to eliminating the weak points as revealed by the operation. Thereby one may reach, for simple equipment, a nearly maintenance-free condition in which the only maintenance needed is surveillance, which provides assurance that everything is operating properly. A good example of this type of equipment is the family of static components, drums, and pipes whose corrective maintenance is almost nil when their initial condition is good

  20. Pilot Study for Maintenance Rule at KSNP

    International Nuclear Information System (INIS)

    Choi, Kwang Hee; Jeong, Hyeon Jong; Jee, Moon Hak; Hong, Sung Yull

    2005-01-01

    Maintenance Rule (MR), which was developed to monitor the effectiveness of maintenance in a nuclear power plant (NPP), has been received as highly successful program by and large since its implementation in 1996 in the United States. Korea has initiated two pilot programs to implement the Maintenance Rule program in 2003. Selected plants for the pilot implementation are Kori 3 and 4 units and Ulchin 3 and 4 units, where Kori 3 and 4 units are Westinghouse units and Ulchin 3 and 4 units are Korean Standardized Nuclear Power (KSNP) Plant units. This paper describes the results of each key tasks completed to date and insights gained from pilot study on the KSNP units. Currently, Scoping of the functions of maintenance rule and determination of safety significance level have been completed during first year. As first task, total 607 functions were identified and defined by detailed function analysis on 135 systems that cover all plant systems. About 55% of total functions are selected as within the scope of maintenance rule. Among these inscoped functions, 56% of scoped functions are safety related and 44% are non-safety related functions. Evaluation of safety significance for each function was determined by expert panel consist of eight experts in field of plant maintenance, operation, PSA, work schedule and system engineers. As a result, about 46% of functions were determined to be high safety significant functions and rest of the functions were classified as low safety significant. The remaining tasks that are included determination of performance criteria and preparation of implementing guideline will be performed in following years

  1. Variation in the Viral Hepatitis and HIV Policies and Practices of Methadone Maintenance Programs.

    Science.gov (United States)

    Jessop, Amy B; Hom, Jeffrey K; Burke, Monika

    Patients prescribed methadone maintenance treatment (MMT) demonstrate elevated prevalence of hepatitis B virus (HBV), hepatitis C virus, and HIV. Government agencies recommend testing for these infections in MMT programs, but uptake is limited. We audited infection-related policies and practices of all 14 MMT programs in Philadelphia, Pennsylvania, in 2015. Results were tabulated and compared with the results from a 2010 audit of 10 of 12 MMT programs. The audit focused on which patients are tested, timing and frequency, specific tests ordered, vaccination, and communication of test results. Written policies were nonspecific, offering little guidance on appropriate testing. The principal change in policy between 2010 and 2015 involved adding clearer guidance for communication of results to patients. In 2010 and 2015, all MMT programs tested new patients for hepatitis C virus antibodies, although retesting of existing patients varied. HBV testing increased from 2010 to 2015, though it was not uniform, with 5 programs testing for HBV surface antibodies and 10 programs testing for HBV surface antigens. Six programs assessed hepatitis vaccination status, but only 1 administered vaccines. In 2010, city-sponsored HIV antibody testing was available at all MMT programs. Without this program in 2015, few MMT programs conducted HIV testing. Despite limited hepatitis and HIV screening in MMT programs nationally, this study shows that testing can be incorporated into routine procedures. MMT programs are positioned to play an integral role in the identification of patients with chronic infections, but additional guidance and resources are required to maximize their impact.

  2. Preventive maintenance basis: Volume 31 -- Relays -- timing. Final report

    International Nuclear Information System (INIS)

    Worledge, D.; Hinchcliffe, G.

    1998-07-01

    US nuclear power plants are implementing preventive maintenance (PM) tasks with little documented basis beyond fundamental vendor information to support the tasks or their intervals. The Preventive Maintenance Basis project provides utilities with the technical basis for PM tasks and task intervals associated with 40 specific components such as valves, electric motors, pumps, and HVAC equipment. This document provides a program of preventive maintenance tasks suitable for application to timing relays. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used in conjunction with material from other sources, to develop a complete PM program or to improve an existing program

  3. Preventive maintenance basis: Volume 30 -- Relays -- control. Final report

    International Nuclear Information System (INIS)

    Worledge, D.; Hinchcliffe, G.

    1998-07-01

    US nuclear power plants are implementing preventive maintenance (PM) tasks with little documented basis beyond fundamental vendor information to support the tasks or their intervals. The Preventive Maintenance Basis project provides utilities with the technical basis for PM tasks and task intervals associated with 40 specific components such as valves, electric motors, pumps, and HVAC equipment. This document provides a program of preventive maintenance tasks suitable for application to control relays. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used in conjunction with material from other sources, to develop a complete PM program or to improve an existing program

  4. Maintenance quality assurance peer exchange 2.

    Science.gov (United States)

    2009-04-01

    This report documents a comprehensive study of twenty three maintenance quality assurance : (MQA) programs throughout the United States and Canada. The policies and standards of : each program were synthesized to create a general assessment on the co...

  5. Autonomous and professional maintenance in metallurgical enterprise as activities within total productive maintenance

    Directory of Open Access Journals (Sweden)

    B. Gajdzik

    2014-04-01

    Full Text Available The content of this publication consists of notions connected with Total Productive Maintenance (TPM in metallurgical enterprise. The basic areas of devices condition management through Autonomous and Professional Maintenance are described here. Mentioned areas of activities are performed in metallurgical enterprise ArcelorMittal Poland within pillars of World Class Manufacturing (WCM. The aims of UR programs are to maintain the basic functionality of the devices and decrease the number of failures in order to reach improvement of production efficiency.

  6. State-of-the-art Model M-2 Maintenance System

    International Nuclear Information System (INIS)

    Herndon, J.N.; Martin, H.L.; Satterlee, P.E. Jr.; Jelatis, D.G.; Jennrich, C.E.

    1984-04-01

    The Model M-2 Maintenance System is part of an ongoing program within the Consolidated Fuel Reprocessing Program (CFRP) at Oak Ridge National Laboratory (ORNL) to improve remote manipulation technology for future nuclear fuel reprocessing and other remote applications. Techniques, equipment, and guidelines which can improve the efficiency of remote maintenance are being developed. The Model M-2 Maintenance System, installed in the Integrated Equipment Test (IET) Facility at ORNL, provides a complete, integrated remote maintenance system for the demonstration and development of remote maintenance techniques. The system comprises a pair of force-reflecting servomanipulator arms, television viewing, lighting, and auxiliary lifting capabilities, thereby allowing manlike maintenance operations to be executed remotely within the remote cell mockup area in the IET. The Model M-2 Maintenance System incorporates an upgraded version of the proven Central Research Laboratories' Model M servomanipulator. Included are state-of-the-art brushless dc servomotors for improved performance, remotely removable wrist assemblies, geared azimuth drive, and a distributed microprocessor-based digital control system. 5 references, 8 figures

  7. Empirical analysis of selected nuclear power plant maintenance factors and plant safety

    International Nuclear Information System (INIS)

    Olson, J.; Osborn, R.N.; Thurber, J.A.; Sommers, P.E.; Jackson, D.H.

    1985-07-01

    This report contains a statistical analysis of the relationship between selected aspects of nuclear power plant maintenance programs and safety related performance. The report identifies a large number of maintenance resources which can be expected to influence maintenance performance and subsequent plant safety performance. The resources for which data were readily available were related statistically to two sets of performance indicators: maintenance intermediate safety indicators and final safety performance indicators. The results show that the administrative structure of the plant maintenance program is a significant predictor of performance on both sets of indicators

  8. Developing a CANDU industry maintenance guide. A 'community of practice' compendium

    International Nuclear Information System (INIS)

    Von Hatten, P.; Hoye, D.S.

    2011-01-01

    The CANDU Owners Group (COG) has initiated a joint utility project to create an Industry Maintenance Guide. The primary goal of the guide is to provide a structured template of activities to implement the maintenance program, based on industry best practices, and with consideration for new regulatory requirements identified in the Canadian Nuclear Safety Commission document S210. The guide will be prepared with a macro view of the maintenance program, which includes core maintenance activities as well as supporting activities and programs in Engineering, Supply Chain and Work Management. Currently there is no such document that solidly links all the requirements to develop, support and execute a maintenance program. Some elements are captured in various industry documents such as INPO documents AP928, Work Management, AP913, Equipment Reliability and AP908, Materials and Services. The guide will not replicate these good practices, but will focus on how they are linked and interrelate to create an optimum program. It is expected that utilities will be able to utilize the guide to take the next incremental step in performance based on cross functional alignment and efficiency.

  9. 40 CFR 57.109 - Maintenance of pay.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Maintenance of pay. 57.109 Section 57.109 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PRIMARY NONFERROUS SMELTER ORDERS General § 57.109 Maintenance of pay. The Administrator will not approve...

  10. The state-of-the-art Model M-2 Maintenance System

    International Nuclear Information System (INIS)

    Herndon, J.N.; Martin, H.L.; Satterlee, P.E. Jr.; Jelatis, D.G.; Jennrich, C.E.

    1984-01-01

    The Model M-2 Maintenance System is part of an ongoing program within the Consolidated Fuel Reprocessing Program (CFRP) at Oak Ridge National Laboratory (ORNL) to improve remote manipulation technology for future nuclear fuel reprocessing and other remote applications. Techniques, equipment, and guidelines which can improve the efficiency of remote maintenance are being developed. The Model M-2 Maintenance System, installed in the Integrated Equipment Test (IET) Facility at ORNL, provides a complete, integrated remote maintenance system for the demonstration and development of remote maintenance techniques. The system comprises a pair of force-reflecting servomanipulator arms, television viewing, lighting, and auxiliary lifting capabilities, thereby allowing manlike maintenance operations to be executed remotely within the remote cell mockup area in the IET. The Model M-2 Maintenance System incorporates an upgraded version of the proven Central Research Laboratories' Model M servomanipulator. Included are state-of-the-art brushless dc servomotors for improved performance, remotely removable wrist assemblies, geared azimuth drive, and a distributed microprocessor-based digital control system

  11. Establishing an In-House Wind Maintenance Program

    Energy Technology Data Exchange (ETDEWEB)

    None

    2011-12-01

    Update to the 2008 guidebook titled “Establishing an In-house Wind Maintenance Program”, which was developed to support utilities in developing O&M strategies. This update includes significant contributions from utilities and other stakeholders around the country, representing all perspectives and regardless of whether or not they own wind turbines or projects.

  12. The meteorological monitoring audit, preventative maintenance and quality assurance programs at a former nuclear weapons facility

    International Nuclear Information System (INIS)

    Maxwell, D.R.

    1995-01-01

    The purposes of the meteorological monitoring audit, preventative maintenance, and quality assurance programs at the Rocky Flats Environmental Technology Site (Site), are to (1) support Emergency Preparedness (EP) programs at the Site in assessing the transport, dispersion, and deposition of effluents actually or potentially released into the atmosphere by Site operations; and (2) provide information for onsite and offsite projects concerned with the design of environmental monitoring networks for impact assessments, environmental surveillance activities, and remediation activities. The risk from the Site includes chemical and radioactive emissions historically related to nuclear weapons component production activities that are currently associated with storage of large quantities of radionuclides (plutonium) and radioactive waste forms. The meteorological monitoring program provides information for site-specific weather forecasting, which supports Site operations, employee safety, and Emergency Preparedness operations

  13. Field maintenance of radiation-shielding windows at HFEF

    International Nuclear Information System (INIS)

    Tobias, D.A.

    1983-01-01

    The achievement of excellent viewing through hot-cell shielding windows does not occur by chance. Instead, it requires a well planned and executed program of field maintenance. The lack of such a program is a major factor when a hot-cell facility has poor window viewing. At HFEF, all preventive maintenance is performed by one group of trained technical-support personnel under the immediate direction of a Systems Engineer, who has responsibility for the shielding windows. Window maintenance is prescheduled and recorded by being incorporated into the computerized Maintenance Data System (MDS). Measurements of window light transmission are scheduled annually to determine glass browning or oil cloudiness conditions within the window tank. The tank oil is sampled and chemically analyzed annually to determine the moisture content, the acidity, and the probable deterioration rate caused by irradiation

  14. Elimination of maintenance outage and cost reduction by development of outage-free maintenance techniques

    International Nuclear Information System (INIS)

    Jakabe, Hideo; Maruyama, Yoshinaga

    1996-01-01

    The development program of KEPCO on outage-free maintenance techniques for distribution line work since 1984 is overviewed. It has succeeded in eliminating maintenance outages since 1989. The original aim was to improve customer satisfaction. However, in all, four benefits were realised through the development. These are cost reduction, securing of worker safety, improvement of customer service, and advancement of distribution techniques and morale in KEPCO. The introduction of robotic techniques for maintenance work and manipulator techniques for repair work is planned for further modernization. These new techniques are helping in both work safety and work efficiency improvement. Cost reduction and advancement of distribution line work techniques is also considered. (R.P.)

  15. NPP component maintenance and life management in Russia

    International Nuclear Information System (INIS)

    Tutnov, I.; Lyssakov, V.

    2002-01-01

    This report represents the conceptual strategies (ideas) on life management programs for nuclear power plants. Use of the optimum programs for NPP's NDE, maintenance service, operation and service life can provide the best economic benefit for the utilities. The paper presents general approaches to life management, maintenance service, and risks of operating and service life of NPPs in Russia. The report offers some optimized ways for the solution of these important tasks

  16. Hardware and software maintenance strategies for upgrading vintage computers

    International Nuclear Information System (INIS)

    Wang, B.C.; Buijs, W.J.; Banting, R.D.

    1992-01-01

    The paper focuses on the maintenance of the computer hardware and software for digital control computers (DCC). Specific design and problems related to various maintenance strategies are reviewed. A foundation was required for a reliable computer maintenance and upgrading program to provide operation of the DCC with high availability and reliability for 40 years. This involved a carefully planned and executed maintenance and upgrading program, involving complementary hardware and software strategies. The computer system was designed on a modular basis, with large sections easily replaceable, to facilitate maintenance and improve availability of the system. Advances in computer hardware have made it possible to replace DCC peripheral devices with reliable, inexpensive, and widely available components from PC-based systems (PC = personal computer). By providing a high speed link from the DCC to a PC, it is now possible to use many commercial software packages to process data from the plant. 1 fig

  17. Optimizing preventive maintenance

    International Nuclear Information System (INIS)

    DiCola, F.E.

    1988-01-01

    The traditional approach to preventive maintenance (PM) is based on adherence to manufacturers's requirements and recommended frequencies. When equipment fails, either new procedures are established or the frequency is increased. This leads to an increase in the number of PM activities, overloading not only maintenance resources, but support as well. There is no correlation between more PM and an increase in equipment reliability. More PM may actually induce failures. Reliability-centered maintenance, a new concept in utility maintenance, is based on identifying system/subsystem functions, failures, and dominant failure modes to develop or revise PM tasks. The activities described in this paper are based on actual implementation of this concept on an ongoing project to upgrade the PM program at one of the largest electric utilities in the country. Optimum PM activities are those that, when implemented, will minimize factors that c cause equipment to fail. One technique described illustrates how equipment performance, failure modes, and causes can be related to minimize the occurrence of failures. Operating history and service life of a component are key factors in determining the most effective PM activities, provided that the factors are related to failure modes and causes

  18. The Nordic maintenance care program--time intervals between treatments of patients with low back pain: how close and who decides?

    DEFF Research Database (Denmark)

    Sandnes, Kjerstin F; Bjørnstad, Charlotte; Leboeuf-Yde, Charlotte

    2010-01-01

    The management of chiropractic patients with acute and chronic/persistent conditions probably differs. However, little is known on this subject. There is, for example, a dearth of information on maintenance care (MC). Thus it is not known if patients on MC are coerced to partake in a program...... of frequent treatments over a long period of time, or if they are actively involved in designing their own individualized treatment program....

  19. Nuclear Power Plant Preventive Maintenance Scheduling Problem with Fuzziness

    International Nuclear Information System (INIS)

    Abass, S.A.; Abdallah, A.S.

    2013-01-01

    Maintenance activity is regarded as the most important key factor for the safety, reliability and economy of a nuclear power plant. Preventive maintenance refers to set of planned activities which include nondestructive testing and periodic inspection as well as maintenance. In this paper, we address the problem of nuclear power plant preventive maintenance scheduling with uncertainty. The uncertainty will be represented by fuzzy parameters. The problem is how to determine the period for which generating units of an electric system should be taken off line for planned preventive maintenance over specific time horizon. Preventive maintenance activity of a nuclear power plant is an important issue as it designed to extend the plant life . It is more required to review the maintenance not only from the view point of safety and reliability but also economy. Preventive maintenance program exists to ensure that nuclear safety significant equipment will function when it is supposed to. Also this problem is extremely important because a failure in a power plant may cause a general breakdown in an electric network. In this paper a mixed integer programming model is used to express this problem. In proposed model power demand is taken as fuzzy parameters. A case study is provided to demonstrate the efficiency of the proposed model.

  20. 25 CFR 170.802 - How is road maintenance funded?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How is road maintenance funded? 170.802 Section 170.802 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.802 How is road maintenance funded? (a) The U.S. Congress funds a BIA...

  1. Proficiency evaluation of maintenance personnel: Training equivalency determination

    International Nuclear Information System (INIS)

    Price, W.J.

    1991-01-01

    The nuclear industry has recognized the importance of safe, quality, productive maintenance practices and has taken a number of initiatives that have generally improved maintenance programs. Because proficient maintenance practices are critical to plant safety and reliability, most plants have also recognized the need for reliable, valid testing techniques that demonstrate and assure the competence of their maintenance personnel. Until now, resource demands were too great to develop in-plant testing programs. In the past, maintenance supervisors have exempted personnel from training, using informal judgment of the employees' previous training and experience and informal observation of the employee on the job. While this procedure may have some degree of validity, it fails to provide the documentation for training equivalency that is required to satisfy the US Nuclear Regulatory Commission (NRC) regulations and Institute of Nuclear Power Operations (INPO) guidelines. To assess and demonstrate the proficiency levels of personnel, Calvert Cliffs needed to establish an objective, reliable, time-saving, and valid system to evaluate the competency levels of personnel. This was done in a joint effort with the Electric Power Research Institute

  2. Reliability Centered Maintenance for Savannah River Site's interim waste management facilities

    Energy Technology Data Exchange (ETDEWEB)

    Hauer, K.A. (Westinghouse Savannah River Co., Aiken, SC (United States)); Wilson, J.F. (PRC, Inc. (US))

    1992-01-01

    The application of Reliability Centered Maintenance (RCM) has been shown to be an effective means to optimize maintenance programs or to establish new programs. The key to success of any RCM program is to customize the methodology to meet the specific needs of the implementing organization. This paper discusses how RCM is being used to establish the preventive maintenance program and how the resulting system data is being used to support the Technical Baseline reconstitution effort for the interim Waste Management Division of Westinghouse Savannah River Company (WSRC).

  3. Phd dissertation on: Effects of an expressive writing intervention in a nationwide sample of breast cancer patients

    DEFF Research Database (Denmark)

    Jensen-Johansen, Mikael Birkelund

    2010-01-01

    and cancer patients. EWI had been used in 10 of the studies (n=661) with number of participants ranging from 30 to 234 and an average sample size of 82.6. Across all available studies, EWI did not show the hypothesized therapeutic effect on either psychological or physical outcomes. However, when including...... at baseline with respect to the prevalence of somatic symptoms, depression, distress, and sociodemografic patterns, and to compare the present sample with a large Danish cohort of 3500 Danish women treated for breast cancer. Objective 4 – To investigate the impact of EWI on the outcomes of cancer related...... is a literature review and meta-analysis of studies of expressive writing intervention (EWI) focusing on health outcomes in samples of cancer patients. A list of randomized clinical trials (RCT) of EWI with cancer patients published before December 2009 was compiled using relevant search engines and previously...

  4. The maintenance management for lean organization

    Directory of Open Access Journals (Sweden)

    Daniel D. GEORGESCU

    2010-12-01

    Full Text Available The goal of lean maintenance approach is to maintain organization international competitiveness. In the spirit of continuously improvement, in the paper it is shown how by adjusting some Lean manufacturing specific techniques for Total Productive Maintenance (TPM system, was born new maintenance system named Lean TPM. This is a systemic approach with three techniques, which don’t exclude specific techniques of TPM pillars, but complete them: the 7Ss as a critical first step in any improvement program; instantaneous maintenance; improvement setup operations. In the spirit of Lean principle, Lean TPM adjusts overall equipment effectiveness concept for all supply-chain from supplier to customer. Maintaining equipment in its optimal state and continually improving its productivity is the whole strategy behind Lean TPM.

  5. Early implementation of the Maintenance Rule

    International Nuclear Information System (INIS)

    Green, J.R.

    1995-01-01

    On July 10, 1991, the U.S. Nuclear Regulatory Commission (NRC) published the Maintenance Rule as Section 50.65 of 10 CFR 50. The purpose of the Maintenance Rule is to ensure that the effectiveness of maintenance activities is assessed on an ongoing basis in a manner that ensures key structures, systems, and components are capable of performing their intended function. Full implementation of the rule is required by July 10, 1996. On May 31, 1994, the NRC published Generic Letter 94-01, which allowed removal of technical specification accelerated testing and special reporting requirements for emergency diesel generators provided a program is implemented for monitoring and maintaining emergency diesel generator performance consistent with the provisions of the Maintenance Rule

  6. Managing aging in nuclear power plants: Insights from NRC's Maintenance Team Inspection reports

    International Nuclear Information System (INIS)

    Fresco, A.; Subudhi, M.

    1992-01-01

    A plant's maintenance program is the principal vehicle through which age-related degradation is managed. From 1988 to 1991, the NRC evaluated the maintenance program of every nuclear power plant in the United States. Forty-four out of a total of sixty-seven of the reports issued on these in-depth team inspections have been reviewed for insights into the strengths and weaknesses of the programs as related to the need to understand and manage the effects of aging on nuclear plant structures, systems, and components (SSCs). Relevant information has been extracted from these inspection reports sorted into several categories; including Specific Aging Insights, Preventive Maintenance, Predictive Maintenance and Condition Monitoring, Post Maintenance Testing, Failure Trending, Root Cause Analysis and Usage of Probabilistic Risk Assessment in the Maintenance Process. Specific examples of inspection and monitoring techniques successfully used by utilities to detect degradation due to aging have been identified

  7. Plant inspection and maintenance technology

    International Nuclear Information System (INIS)

    Miyahara, Masatoshi; Kanazawa, Masafumi

    1995-01-01

    The article reports on information systems and related tools that support routine inspection and preventive maintenance activities, which contribute to safer plant operation and increase plant operating duty. Tools include the Mitsubishi Electric Reliability and Availability Upgrade Program-Nuclear (MELRAP-N), which supports the general evolution of industry operating experiences, periodic component replacement management, management of discontinued and modified components, periodic inspection item management, and periodic inspection workplace management. The article also introduces a comprehensive preventive maintenance management system currently under development. (author)

  8. Corrective maintenance support system for nuclear power plants

    International Nuclear Information System (INIS)

    Kakiuchi, Tetsuo

    1996-01-01

    With increase of share of nuclear power generation in electric power supply in Japan, requirement for further safe operation and improvement of economics for the nuclear power plants is promoting. The pressed water type (PWR) nuclear power plant in operation in Japan reaches to 22 sets, application rate of the instruments is 74% as mean value for 7 years since 1989 and in high level, which is due to a result of preventive maintenance in ordinary and periodical inspections. The present state of maintenance at the nuclear power plant is mainly preventive maintenance, which is mainly conducted in a shape of time planning maintenance but partially in a shape of state monitoring maintenance for partial rotating appliances. Concretely speaking, the periodical inspection was planned on a base of daily inspection and a long term program on maintenance, and executed on a base of feedback function to think of the long term program again by evaluating the periodical inspection results. Here were introduced on the monitoring diagnosis and periodical inspection regionalization equipment, fatigue monitoring system, automatic supersonic wave damage inspection equipment for reactor, steam evaporator heat conductive tube inspection equipment, automatic testing equipment for measuring controller, air working valve property testing equipment, as maintaining support system in the PW generation plant. (G.K.)

  9. Evaluation of NRC maintenance team inspection reports for managing aging

    International Nuclear Information System (INIS)

    Fresco, A.; Gunther, W.

    1991-01-01

    A nuclear power plant's maintenance program is the principal vehicle through which age-related degradation is managed. Over the past two years, the NRC [Nuclear Regulatory Commission] has evaluated the maintenance program of every nuclear power plant in the U.S. The reports issued on these in-depth team inspections have been reviewed to ascertain the strengths and weaknesses of the programs as related to the need to understand and manage the effects of aging on nuclear power plant systems, structures, and components. Selected results of this review are presented in this paper, including examples of inspection and monitoring techniques successfully used by utilities to detect degradation due to aging. Attributes of plant maintenance programs where the NRC inspectors felt that improvement was needed to properly address the aging issue are also discussed. 6 refs., 1 tab

  10. Maintenance self-assessments - An INPO [Institute of Nuclear Power Operation] perspective

    International Nuclear Information System (INIS)

    Subalusky, W.T.

    1990-01-01

    In March 1987, all nuclear utilities in the US were requested by the Institute of Nuclear Power Operations (INPO) to perform a self-assessment of their maintenance programs. The goal of these self-assessments was to have each station identify any existing problem areas in maintenance in clear and sufficient detail to determine the root causes of the problems and to provide a foundation for subsequent corrective actions. The self-assessments were to be performed by each nuclear station using the INPO document Guidelines for the Conduct of Maintenance at Nuclear Power Stations. By December 1987, 72 of 74 stations had completed the self-assessments, and by the middle of 1988, all stations had completed this systematic review of their maintenance programs. As part of an industry plan to ensure continued improvements in maintenance, INPO is following up on the effectiveness of these self-assessments during the course of plant evaluation visits. This presentation briefly reviews the approaches to self-assessment of the station's maintenance programs, some of the lessons learned from this effort, and the results, to date, of INPO follow-up efforts in this area

  11. SYSTMS: Systematic approach for the development of strategies for maintenance and surveillance

    International Nuclear Information System (INIS)

    Yang, J.X.; McCrea, L.; Dam, R.F.; Nickerson, J.H.

    2004-01-01

    As part of AECL's Integrated PLiM program, the SYSTMS TM tool has been developed to assist in applying the Systematic Assessment of Maintenance (SAM) technology. SYSTMS builds upon AECL's experience in this area, capturing lessons learned to result in an efficient and effective assessment of system maintenance in NPPs. An important feature of SYSTMS is that it provides analysts with needed information that is easy to review and select for inclusion in the system maintenance assessment. This is accomplished through the use of maintenance templates which can be built and tracked using SYSTMS or imported from AECL's own Maintenance Template Database. This database was developed originally to capture information gathered in SAM studies for use in future studies. It has grown to become a central tool for organizing and integrating aging related knowledge from both within AECL and from outside resources. The SYSTMS tool and the Maintenance Template Database work together to provide an effective tool for performing SAM assessments. This combination also becomes an integral part of the Asset Management program development and System based Adaptive Maintenance Program applications. This paper looks at the features of the SYSTMS tool and Maintenance Database, and discusses how these tools are an important part of the AECL Integrated PLiM products and services. (author)

  12. Maintenance Implementation Plan for B Plant

    International Nuclear Information System (INIS)

    Tritt, S.E.

    1993-04-01

    The objective of the Maintenance Implementation Plan (MIP) is to describe how the B Plant will implement the requirements established by US Department of Energy (DOE) Order 4330.4A, Maintenance Management Program, Chapter II, ''Nuclear Facilities'' (DOE 1990). The plan provides a blueprint for a disciplined approach to implementation and compliance. Each element of the order is prioritized, categorized, and then placed into one of three phases for implementation

  13. Component aging illustrated in maintenance histories from IPRDS

    International Nuclear Information System (INIS)

    Kahl, W.K.; Borkowski, R.J.

    1984-01-01

    The centerpiece of the In-Plant Reliability Data (IPRD) program is a nuclear power plant component data base developed from corrective maintenance records. The primary objective of this program is to establish a comprehensive source of information for reliability analyses, including the compilation of maintenance histories for failure statistics. The IPRD program is currently a pilot effort that has 36 reactor-years of data on pumps, valves, diesel generators, batteries, battery chargers and inverters from five nuclear plants. The data are collected under the auspices of the Institute of Electrical and Electronics Engineers (IEEE) to certify anonymity of the participating plants, and is funded by the Nuclear Regulatory Commission

  14. Early arrival waveform inversion of shallow seismic land data

    KAUST Repository

    Hanafy, Sherif M.

    2013-09-22

    We estimate the near-surface velocity distribution over Wadi Qudaid in Saudi Arabia by applying early arrival waveform inversion (EWI) to shallow seismic land data collected with source-receiver offsets no longer than 232 m. The main purpose is to characterize the shallow subsurface for its water storage and reuse potential. To enhance the accuracy of EWI, we extracted a natural source wavelet from the data, and also corrected for the attenuation effects with an estimated factor Q. Results suggest that, compared to traveltime tomography, EWI can generate a highly resolved velocity tomogram from shallow seismic data. The more accurate EWI tomogram can make an economically important difference in assessing the storage potential of this wadi; in this case we find an increase of 18% of storage potential in the EWI tomogram relative to the traveltime tomogram. This approach suggests that FWI might be a more accurate means for economically characterizing the water storage potential for wadis’ throughout the world.

  15. Spatial early warning signals in a lake manipulation

    Science.gov (United States)

    Butitta, Vince L.; Carpenter, Stephen R.; Loken, Luke; Pace, Michael L.; Stanley, Emily H.

    2017-01-01

    Rapid changes in state have been documented for many of Earth's ecosystems. Despite a growing toolbox of methods for detecting declining resilience or early warning indicators (EWIs) of ecosystem transitions, these methods have rarely been evaluated in whole-ecosystem trials using reference ecosystems. In this study, we experimentally tested EWIs of cyanobacteria blooms based on changes in the spatial structure of a lake. We induced a cyanobacteria bloom by adding nutrients to an experimental lake and mapped fine-resolution spatial patterning of cyanobacteria using a mobile sensor platform. Prior to the bloom, we detected theoretically predicted spatial EWIs based on variance and spatial autocorrelation, as well as a new index based on the extreme values. Changes in EWIs were not discernible in an unenriched reference lake. Despite the fluid environment of a lake where spatial heterogeneity driven by biological processes may be overwhelmed by physical mixing, spatial EWIs detected an approaching bloom suggesting the utility of spatial metrics for signaling ecological thresholds.

  16. An assessment of the relationship between the World Health Organization HIV drug resistance early warning indicators and HIV drug resistance acquisition.

    Science.gov (United States)

    St-Jean, M; Harrigan, P R; Sereda, P; Montaner, Jsg; Lima, V D

    2017-05-01

    The World Health Organization (WHO)'s HIV drug resistance (HIVDR) early warning indicators (EWIs) measure antiretroviral therapy (ART)-site factors associated with HIVDR prevention, without HIVDR laboratory testing. We assessed the relationship between EWIs and HIVDR acquisition using data from British Columbia, Canada. Eligible patients were ART-naïve, were ≥ 19 years old, had initiated ART between 1 January 2000 and 31 December 2012, had ≥ 15 months of follow-up, and were without transmitted HIVDR. Patients were followed for acquired HIVDR until 31 March 2014, the last contact date, or death. We built logistic regression models to assess the associations and predictive ability of individual indicators and of the EWI Score (the number of indicators for which a patient did not meet the criteria) on HIVDR acquisition (to any class of HIVDR, lamivudine (3TC)/emtricitabine (FTC), nonnucleoside reverse transcriptase inhibitors (NNRTIs), nucleoside reverse transcriptase inhibitors (NRTIs) or protease inhibitors (PIs)]). All explored EWIs were associated with at least one class of HIVDR, with the exception of 'ART prescribing practices'. We observed a dose-response relationship between acquiring HIVDR to any antiretroviral class and an increasing EWI score in our predictive logistic regression model. The area under the curve was 0.848 (excellent discrimination). The adjusted odds ratios for acquiring any class of HIVDR for an EWI score of 1, 2 and ≥ 3 versus 0 were 2.30 [95% confidence Interval (CI) 1.21-4.38], 3.35 (95% CI: 1.86-6.03) and 7.26 (95% CI: 4.18-12.61), respectively. Several EWIs were associated with and predictive of HIVDR, supporting the WHO EWIs as a component of the HIVDR prevention method in settings where HIVDR testing is not routinely or widely available. © 2016 British HIV Association.

  17. Managing aging in nuclear power plants: Insights from NRC maintenance team inspection reports

    Energy Technology Data Exchange (ETDEWEB)

    Fresco, A.; Subudhi, M.; Gunther, W.; Grove, E.; Taylor, J. [Brookhaven National Lab., Upton, NY (United States)

    1993-12-01

    A plant`s maintenance program is the principal vehicle through which age-related degradation is managed. From 1988 to 1991, the NRC evaluated the maintenance program of every nuclear power plant in the United States. Forty-four out of a total of 67 of the reports issued on these in-depth team inspections were reviewed for insights into the strengths and weaknesses of the programs as related to the need to understand and manage the effects of aging on nuclear plant systems, structures, and components. Relevant information was extracted from these inspection reports and sorted into several categories, including Specific Aging Insights, Preventive Maintenance, Predictive Maintenance and Condition Monitoring, Post Maintenance Testing, Failure Trending, Root Cause Analysis and Usage of Probabilistic Risk Assessment in the Maintenance Process. Specific examples of inspection and monitoring techniques successfully used by utilities to detect degradation due to aging have been identified. The information also was sorted according to systems and components, including: Auxiliary Feedwater, Main Feedwater, High Pressure Injection for both BWRs and PWRs, Service Water, Instrument Air, and Emergency Diesel Generator Air Start Systems, and Emergency Diesel Generators Air Start Systems, emergency diesel generators, electrical components such as switchgear, breakers, relays, and motor control centers, motor operated valves and check valves. This information was compared to insights gained from the Nuclear Plant Aging Research (NPAR) Program. Attributes of plant maintenance programs where the NRC inspectors felt that improvement was needed to properly address the aging issue also are discussed.

  18. Reliability Centered Maintenance for Savannah River Site`s interim waste management facilities. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Hauer, K.A. [Westinghouse Savannah River Co., Aiken, SC (United States); Wilson, J.F. [PRC, Inc. (US)

    1992-06-01

    The application of Reliability Centered Maintenance (RCM) has been shown to be an effective means to optimize maintenance programs or to establish new programs. The key to success of any RCM program is to customize the methodology to meet the specific needs of the implementing organization. This paper discusses how RCM is being used to establish the preventive maintenance program and how the resulting system data is being used to support the Technical Baseline reconstitution effort for the interim Waste Management Division of Westinghouse Savannah River Company (WSRC).

  19. Developing a comprehensive training curriculum for integrated predictive maintenance

    Science.gov (United States)

    Wurzbach, Richard N.

    2002-03-01

    On-line equipment condition monitoring is a critical component of the world-class production and safety histories of many successful nuclear plant operators. From addressing availability and operability concerns of nuclear safety-related equipment to increasing profitability through support system reliability and reduced maintenance costs, Predictive Maintenance programs have increasingly become a vital contribution to the maintenance and operation decisions of nuclear facilities. In recent years, significant advancements have been made in the quality and portability of many of the instruments being used, and software improvements have been made as well. However, the single most influential component of the success of these programs is the impact of a trained and experienced team of personnel putting this technology to work. Changes in the nature of the power generation industry brought on by competition, mergers, and acquisitions, has taken the historically stable personnel environment of power generation and created a very dynamic situation. As a result, many facilities have seen a significant turnover in personnel in key positions, including predictive maintenance personnel. It has become the challenge for many nuclear operators to maintain the consistent contribution of quality data and information from predictive maintenance that has become important in the overall equipment decision process. These challenges can be met through the implementation of quality training to predictive maintenance personnel and regular updating and re-certification of key technology holders. The use of data management tools and services aid in the sharing of information across sites within an operating company, and with experts who can contribute value-added data management and analysis. The overall effectiveness of predictive maintenance programs can be improved through the incorporation of newly developed comprehensive technology training courses. These courses address the use of

  20. Developing Predictive Maintenance Expertise to Improve Plant Equipment Reliability

    International Nuclear Information System (INIS)

    Wurzbach, Richard N.

    2002-01-01

    On-line equipment condition monitoring is a critical component of the world-class production and safety histories of many successful nuclear plant operators. From addressing availability and operability concerns of nuclear safety-related equipment to increasing profitability through support system reliability and reduced maintenance costs, Predictive Maintenance programs have increasingly become a vital contribution to the maintenance and operation decisions of nuclear facilities. In recent years, significant advancements have been made in the quality and portability of many of the instruments being used, and software improvements have been made as well. However, the single most influential component of the success of these programs is the impact of a trained and experienced team of personnel putting this technology to work. Changes in the nature of the power generation industry brought on by competition, mergers, and acquisitions, has taken the historically stable personnel environment of power generation and created a very dynamic situation. As a result, many facilities have seen a significant turnover in personnel in key positions, including predictive maintenance personnel. It has become the challenge for many nuclear operators to maintain the consistent contribution of quality data and information from predictive maintenance that has become important in the overall equipment decision process. These challenges can be met through the implementation of quality training to predictive maintenance personnel and regular updating and re-certification of key technology holders. The use of data management tools and services aid in the sharing of information across sites within an operating company, and with experts who can contribute value-added data management and analysis. The overall effectiveness of predictive maintenance programs can be improved through the incorporation of newly developed comprehensive technology training courses. These courses address the use of

  1. 24 CFR 266.507 - Maintenance requirements.

    Science.gov (United States)

    2010-04-01

    ... HOUSING FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Project Management and Servicing § 266.507 Maintenance requirements. The mortgagor must maintain the project in...

  2. Operational experience and maintenance programs of Transamerica Delaval, Inc., diesel generators

    International Nuclear Information System (INIS)

    Rajan, J.R.

    1994-05-01

    Concerns regarding the reliability of large-bore, medium-speed diesel generators manufactured by Transamerica Delaval, Inc. (TDI) for application at domestic nuclear plants were first prompted by a crankshaft failure at Shoreham Nuclear Power Station in August 1983. A number of diesel generator components were identified which had potential deficiencies from a manufacturing and operational standpoint. In response to these problems, 11 (now 8) U.S. nuclear utility owners formed a TDI Diesel Generator Owners Group (Owners Group) to address operational and regulatory issues relative to diesel generator sets used for standby emergency power. The Owners' Group performed extensive design reviews of all key engine components and developed recommendations to be implemented by the individual owners concerning needed component replacements and modifications, component inspections to validate the open-quotes as-manufacturedclose quotes and open-quotes as-assembledclose quotes quality of key engine components, engine testing, and an enhanced maintenance and surveillance program

  3. Preventive maintenance basis: Volume 19 -- HVAC -- chillers and compressors. Final report

    International Nuclear Information System (INIS)

    Worledge, D.; Hinchcliffe, G.

    1997-12-01

    US nuclear power plants are implementing preventive maintenance (PM) tasks with little documented basis beyond fundamental vendor information to support the tasks or their intervals. The Preventive Maintenance Basis project provides utilities with the technical basis for PM tasks and task intervals associated with 40 specific components such as valves, electric motors, pumps, and HVAC equipment. This document provides a program of preventive maintenance tasks suitable for application to HVAC -- Chillers and Compressors. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used in conjunction with material from other sources, to develop a complete PM program or to improve an existing program

  4. Degradation mode analysis: An approach to establish effective predictive maintenance tasks

    International Nuclear Information System (INIS)

    Sonnett, D.E.; Douglass, P.T.; Barnard, D.D.

    1991-01-01

    A significant number of nuclear generating stations have been employing Reliability Centered Maintenance methodology to arrive at applicable and effective maintenance tasks for their plant equipment. The resultant endpoint of most programs has been an increased emphasis on predictive maintenance as the task of choice for monitoring and trending plant equipment condition to address failure mechanisms of the analyses. Many of these plants have spent several years conducting reliability centered analysis before they seriously begin implementing predictive program improvements. In this paper we present another methodology, entitled Degradation Mode Analysis, which provides a more direct method to quickly and economically achieve the major benefit of reliability centered analysis, namely predictive maintenance. (author)

  5. Performing maintenance activities on-line a risk perspective

    International Nuclear Information System (INIS)

    Darling, S.S.; Mairs, T.P.

    1993-01-01

    The US nuclear power industry is attempting to deal with the issue of optimizing the performance of maintenance activities with the advent of the maintenance rule. The impact of any maintenance activity on the safe operation of a nuclear power facility can be quantified on the basis of risk. Therefore, it is incumbent upon the industry to accommodate the regulator and present a maintenance optimization program in terms that explicitly address the potential risk inherent in its concept and implementation. The motivation for utilities to perform maintenance while the plant is operating (i.e., on-line) is readily perceived to offer the following advantages: 1. greater system availability; 2. higher plant capacity factor; 3. more evenly distributed workload for the maintenance department; and 4. overall safer plant operation. However, risks inherent in undertaking maintenance activities during power operation could amount to the realization that reapportionment of these tasks is not cost-beneficial. Therefore, it is important that any utility considering implementing such a paradigm in maintenance philosophy establish a rigorous process to select, perform, and monitor maintenance tasks performed while operating

  6. 25 CFR 170.806 - What is an IRR Transportation Facilities Maintenance Management System?

    Science.gov (United States)

    2010-04-01

    ... AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.806 What is an IRR Transportation Facilities Maintenance Management System? An IRR Transportation Facilities Maintenance Management... 25 Indians 1 2010-04-01 2010-04-01 false What is an IRR Transportation Facilities Maintenance...

  7. Maintenance cost avoidance through comprehensive condition monitoring

    International Nuclear Information System (INIS)

    Miller, G.P.; McClymonds, S.L.

    1990-01-01

    Condition monitoring, the measurement and trending of a critical parameter for predictive maintenance, has reached new levels of acceptance and application within the utility and manufacturing industry. Commercially available systems extend well beyond traditional vibration-monitoring systems to include such areas as online wear, crack and leak detection, and stress monitoring. The challenge facing industry is to integrate the information generated from condition monitoring. Current studies indicate that the effectiveness of predictive maintenance depends much more on the program that is established to apply the monitoring techniques than on the monitoring equipment itself. This paper presents a five-phase approach to developing a condition monitoring program

  8. 6. CNS international conference on CANDU maintenance. Proceedings

    International Nuclear Information System (INIS)

    2003-01-01

    The 6th CNS International Conference on CANDU Maintenance took place in Toronto, Ontario on November 16-18, 2003. The theme for the conference was 'Maintenance for Life'. About 270 delegates attended the conference held by the Canadian Nuclear Society. The conference consisted of four parallel sessions, a pattern that continued throughout the conference. Papers were grouped under the following headings: Fuel Channels and End Fittings - Assessments; Fuel Channels and End Fittings - Inspections; Fuel Channels and End Fittings - Maintenance; Fuel Channels and End Fittings - Universal Delivery Machine; Water Upgrading; Performance and Plant Life Improvement; Steam Generator Life Management; Steam Generator Modifications; Steam Generators - Inspections; Steam Generators - Assessments; Maintenance Programs; Feeder Inspections; Feeder Assessment and Mitigation; Valve Maintenance; Instrumentation and Control; Inspection Technology; and Fuel Handling

  9. 49 CFR 260.39 - Maintenance standards.

    Science.gov (United States)

    2010-10-01

    ... REHABILITATION AND IMPROVEMENT FINANCING PROGRAM Standards for Maintenance of Facilities Involved in the Project... the project. (b) When the proceeds of a direct loan or an obligation guaranteed by the Administrator...

  10. Annual summary report of the Decontamination and Decommissioning surveillance and maintenance program at Oak Ridge National Laboratory for period ending September 30, 1992

    International Nuclear Information System (INIS)

    Ford, M.K.; Holder, L. Jr.

    1992-09-01

    The Oak Ridge National Laboratory (ORNL) Decontamination and Decommissioning (D ampersand D) Program is part of the Department of Energy (DOE) Environmental Restoration D ampersand D Program and has continued to provide surveillance and maintenance (S ampersand M) support for 34 surplus facilities. The objectives are (1) to ensure adequate containment of residual radioactive materials remaining in the facilities, (2) to provide safety and security controls to minimize the potential hazards to on-site personnel and to the general public, and (3) to manage the facilities in the most cost-effective manner while awaiting decommissioning. This support has included work in three principal areas: (1) S ampersand M planning, (2) routine S ampersand M, and (3) special projects designed to correct serious facility deficiencies beyond the scope of routine maintenance

  11. A Business Process Analysis of the Surface Navys Depot Maintenance Program

    Science.gov (United States)

    2015-12-01

    levels of maintenance and the ways in which the Navy employs these types of maintenance to accomplish the objective of sustaining the surface fleet...stripping it of inefficiencies to ensure there is no wasted movement. Toyota , Honda, and their Japanese counterparts championed the lean process and...are another way trust is built, because they cultivate the relationships necessary for process improvement and innovation. JSPs have career

  12. Preventive maintenance basis: Volume 37 -- Main turbine EHC hydraulics. Final report

    International Nuclear Information System (INIS)

    Worledge, D.; Hinchcliffe, G.

    1998-11-01

    US nuclear power plants are implementing preventive maintenance (PM) tasks with little documented basis beyond fundamental vendor information to support the tasks or their intervals. The Preventive Maintenance Basis project provides utilities with the technical basis for PM tasks and task intervals associated with 40 specific components such as valves, electric motors, pumps, and HVAC equipment. This document provides a program of preventive maintenance tasks suitable for application to the main turbine EHC hydraulic fluid and associated components. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used in conjunction with material from other sources, to develop a complete PM program or to improve an existing program

  13. Applying reliability centered maintenance analysis principles to inservice testing

    International Nuclear Information System (INIS)

    Flude, J.W.

    1994-01-01

    Federal regulations require nuclear power plants to use inservice test (IST) programs to ensure the operability of safety-related equipment. IST programs are based on American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code requirements. Many of these plants also use Reliability Centered Maintenance (RCM) to optimize system maintenance. ASME Code requirements are hard to change. The process for requesting authority to use an alternate strategy is long and expensive. The difficulties of obtaining this authority make the use of RCM method on safety-related systems not cost effective. An ASME research task force on Risk Based Inservice Testing is investigating changing the Code. The change will allow plants to apply RCM methods to the problem of maintenance strategy selection for safety-related systems. The research task force is working closely with the Codes and Standards sections to develop a process related to the RCM process. Some day plants will be able to use this process to develop more efficient and safer maintenance strategies

  14. Maintenance personnel performance simulation (MAPPS): a model for predicting maintenance performance reliability in nuclear power plants

    International Nuclear Information System (INIS)

    Knee, H.E.; Krois, P.A.; Haas, P.M.; Siegel, A.I.; Ryan, T.G.

    1983-01-01

    The NRC has developed a structured, quantitative, predictive methodology in the form of a computerized simulation model for assessing maintainer task performance. Objective of the overall program is to develop, validate, and disseminate a practical, useful, and acceptable methodology for the quantitative assessment of NPP maintenance personnel reliability. The program was organized into four phases: (1) scoping study, (2) model development, (3) model evaluation, and (4) model dissemination. The program is currently nearing completion of Phase 2 - Model Development

  15. Instrumentalization of eating improves weight loss maintenance in obesity

    DEFF Research Database (Denmark)

    Christensen, Bodil Just; Iepsen, Eva Pers Winning; Lundgren, Julie Rehné

    2017-01-01

    Aim: The purpose of this study was to identify psychosocial determinants for maintaining weight loss. Methods: 42 obese individuals who achieved a 12% weight loss before entering a 52-week weight maintenance program were interviewed qualitatively. Psychosocial factors related to weight loss...... weight loss maintenance was associated with an interplay between behavioral, affective and contextual changes. ‘Instrumentalization of eating behavior' seems to be an important element in long-term weight maintenance....

  16. Improvement of the preventive maintenance program of an emergency diesel generator set

    International Nuclear Information System (INIS)

    Jacquot, J.P.; Meuwisse, C.; Cailleaux, J.P.

    1995-01-01

    An exhaustive Reliability Centered Maintenance (RCM) analysis was performed of the emergency diesel generator sets in Electricite de France 900-MW nuclear power plants. The first part of this paper describes the Reliability Centered Maintenance approach, including the functional breakdown, complete analysis of operation feedback and safety assessment of the risk induced by functional diesel failures. The second part shows how this kind of RCM analysis can be used to improve the efficiency of periodic tests of the machine, and more generally, the efficiency of condition-directed maintenance tasks. The underlying objective is to minimize risk and aging of the machine

  17. Effect of job maintenance training program for employees with chronic disease - a randomized controlled trial on self-efficacy, job satisfaction, and fatigue

    NARCIS (Netherlands)

    Varekamp, Inge; Verbeek, Jos H.; de Boer, Angela; van Dijk, Frank J. H.

    2011-01-01

    Employees with a chronic physical condition may be hampered in job performance due to physical or cognitive limitations, pain, fatigue, psychosocial barriers, or because medical treatment interferes with work. This study investigates the effect of a group-training program aimed at job maintenance.

  18. Performance-based maintenance procurement by Dutch housing associations

    NARCIS (Netherlands)

    Straub, A.

    2004-01-01

    OTB Research institute has established a long-term research program to performance-based maintenance procurement in the technical management of housing stock. Stakeholders: housing associations, contractors and the Dutch Building Research Foundation are directly involved in this research program.

  19. Opportune maintenance and predictive maintenance decision support

    OpenAIRE

    Thomas , Edouard; Levrat , Eric; Iung , Benoît; Cocheteux , Pierre

    2009-01-01

    International audience; Conventional maintenance strategies on a single component are being phased out in favour of more predictive maintenance actions. These new kinds of actions are performed in order to control the global performances of the whole industrial system. They are anticipative in nature, which allows a maintenance expert to consider non-already-planned maintenance actions. Two questions naturally emerge: when to perform a predictive maintenance action; how a maintenance expert c...

  20. The maintenance and the data bank of Spanish NNPP (DACNE SYSTEM)

    International Nuclear Information System (INIS)

    Gonzalez Anez, F.

    1995-01-01

    New projects and activities appear at Nuclear Industry with the purpose of improving availability and safety of the plants, i.e. Probabilistic Safety Assessment (PSA), maintenance optimization programs or life extension programs. A common characteristic of these projects is that they need collect data from different sources. A multipurpose information system, as Spanish DACNE System, can be useful. Some applicabilities are presented in maintenance area. (Author)

  1. Understanding and Predicting the Process of Software Maintenance Releases

    Science.gov (United States)

    Basili, Victor; Briand, Lionel; Condon, Steven; Kim, Yong-Mi; Melo, Walcelio L.; Valett, Jon D.

    1996-01-01

    One of the major concerns of any maintenance organization is to understand and estimate the cost of maintenance releases of software systems. Planning the next release so as to maximize the increase in functionality and the improvement in quality are vital to successful maintenance management. The objective of this paper is to present the results of a case study in which an incremental approach was used to better understand the effort distribution of releases and build a predictive effort model for software maintenance releases. This study was conducted in the Flight Dynamics Division (FDD) of NASA Goddard Space Flight Center(GSFC). This paper presents three main results: 1) a predictive effort model developed for the FDD's software maintenance release process; 2) measurement-based lessons learned about the maintenance process in the FDD; and 3) a set of lessons learned about the establishment of a measurement-based software maintenance improvement program. In addition, this study provides insights and guidelines for obtaining similar results in other maintenance organizations.

  2. Oak Ridge Research Reactor shutdown maintenance and surveillance

    International Nuclear Information System (INIS)

    Coleman, G.H.; Laughlin, D.L.

    1990-10-01

    The Department of Energy ordered the Oak Ridge Research Center Reactor to be placed in permanent shutdown on July 14, 1987. Maintenance activities, both mechanical and instrument, were essentially routine in nature. The performance of the instrumentation for the facility was satisfactory, and maintenance required is provided. The performance of the process system was satisfactory, and maintenance required is indicated. The results of efficiency tests of the various gaseous-waste filters have been summarized and preparations for transfer of the facility to the remedial action program is also indicated

  3. Maintenance implementation plan for T Plant. Revision 2

    International Nuclear Information System (INIS)

    Ayers, W.S.

    1995-05-01

    This document is a Maintenance Implementation Plan (MIP) for the T Plant Facility complex located in the 200 West Area of the Hanford Reservation in Washington state. This plan has been developed to provide a disciplined approach to maintenance functions and to describe how the T Plant facility will implement and comply with the regulations according to US DOE order 4330.4B, entitled Maintenance Management Program, Chapter 2.0 open-quotes Nuclear Facilitiesclose quotes. Physical structures, systems, processes, as well as all associated equipment specifically assigned to these groups are included in the MIP

  4. Nuclear maintenance strategy and first steps for preliminary maintenance plan of the EU HCLL & HCPB Test Blanket Systems

    Energy Technology Data Exchange (ETDEWEB)

    Galabert, Jose, E-mail: jose.galabert@f4e.europa.eu [F4E Fusion for Energy, EU Domestic Agency, c/Josep Pla, 2. B3, 08019, Barcelona (Spain); Hopper, Dave [AMEC Foster Wheeler, Faraday Street, Birchwood Park, WA3 6GN (United Kingdom); Neviere, Jean-Cristophe [ITER Organization, Route de Vinon-sur-Verdon, CS 90046, 13067, St. Paul Lez Durance Cedex (France); Nodwell, David [CCFE, Culham Science Centre, Abingdon, OX14 3DB, Oxfordshire (United Kingdom); Pascal, Romain [ITER Organization, Route de Vinon-sur-Verdon, CS 90046, 13067, St. Paul Lez Durance Cedex (France); Poitevin, Yves; Ricapito, Italo [F4E Fusion for Energy, EU Domestic Agency, c/Josep Pla, 2. B3, 08019, Barcelona (Spain); White, Gareth [AMEC Foster Wheeler, Faraday Street, Birchwood Park, WA3 6GN (United Kingdom)

    2017-03-15

    Highlights: • Nuclear maintenance strategy for the two European (EU) Test Blanket Systems (TBS): i/. Helium Cooled Lead Lithium (HCLL) and ii/. Helium Cooled Pebble Bed (HCPB). • Preliminary identification of maintenance tasks for most relevant components of the EU HCLL & HCPB TBS. • Preliminary feasibility analysis for hands-on maintenance tasks of some relevant components of the European Test Blanket Systems. • Design recommendations for enhancement of the European Test Blanket Systems maintainability. - Abstract: This paper gives an overview of nuclear maintenance strategy to be followed for the European HCLL & HCPB Test Blanket Systems (TBS) to be installed in ITER. One of the several core documents to prepare in view of their licensing is their respective ‘Maintenance Plan’. This document is fundamental for ensuring sound performance and safety of the TBS during ITER’s operational phase and shall include, amongst others, relevant information on: maintenance organization, preventive and corrective maintenance task procedures, condition monitoring for key components, maintenance work planning, and a spare parts plan, just to mention some of the key topics. In compliance with the ITER Plant Maintenance policy, first steps have been taken aimed at defining nuclear maintenance strategy for some of the most relevant HCLL & HCPB TBS components, conducted by F4E in collaboration with industry. After a brief recall of maintenance strategy of the TBM Program (PBS-56), this paper analyses main features of EU HCLL & HCPB TBS maintainability and identifies, at their conceptual design phase, a preliminary list of maintenance tasks to be developed for their most representative components. In addition, the paper also presents the first nuclear maintenance studies conducted for replacement of the Q{sub 2} Getter Beds, identifying some design recommendations for their sound maintainability.

  5. Nuclear maintenance strategy and first steps for preliminary maintenance plan of the EU HCLL & HCPB Test Blanket Systems

    International Nuclear Information System (INIS)

    Galabert, Jose; Hopper, Dave; Neviere, Jean-Cristophe; Nodwell, David; Pascal, Romain; Poitevin, Yves; Ricapito, Italo; White, Gareth

    2017-01-01

    Highlights: • Nuclear maintenance strategy for the two European (EU) Test Blanket Systems (TBS): i/. Helium Cooled Lead Lithium (HCLL) and ii/. Helium Cooled Pebble Bed (HCPB). • Preliminary identification of maintenance tasks for most relevant components of the EU HCLL & HCPB TBS. • Preliminary feasibility analysis for hands-on maintenance tasks of some relevant components of the European Test Blanket Systems. • Design recommendations for enhancement of the European Test Blanket Systems maintainability. - Abstract: This paper gives an overview of nuclear maintenance strategy to be followed for the European HCLL & HCPB Test Blanket Systems (TBS) to be installed in ITER. One of the several core documents to prepare in view of their licensing is their respective ‘Maintenance Plan’. This document is fundamental for ensuring sound performance and safety of the TBS during ITER’s operational phase and shall include, amongst others, relevant information on: maintenance organization, preventive and corrective maintenance task procedures, condition monitoring for key components, maintenance work planning, and a spare parts plan, just to mention some of the key topics. In compliance with the ITER Plant Maintenance policy, first steps have been taken aimed at defining nuclear maintenance strategy for some of the most relevant HCLL & HCPB TBS components, conducted by F4E in collaboration with industry. After a brief recall of maintenance strategy of the TBM Program (PBS-56), this paper analyses main features of EU HCLL & HCPB TBS maintainability and identifies, at their conceptual design phase, a preliminary list of maintenance tasks to be developed for their most representative components. In addition, the paper also presents the first nuclear maintenance studies conducted for replacement of the Q_2 Getter Beds, identifying some design recommendations for their sound maintainability.

  6. Starting a Planned Maintenance Program on a Shoestring

    Science.gov (United States)

    Adams, Matt

    2013-01-01

    This article addresses two of the most repeated questions in APPA (1) How can we convert our reactive maintenance operations to a planned and predictable operation? and (2) In addition, how can we do this with little or no additional resources? It seems reasonable to assume that if a department is short on resources and in a full-blown reactive…

  7. Plant life management and maintenance technologies for nuclear power plants

    International Nuclear Information System (INIS)

    Ikegami, Tsukasa; Aoki, Masataka; Shimura, Takao; Kaimori, Kimihiro; Koike, Masahiro

    2001-01-01

    Nuclear power generation occupying an important position for energy source in Japan and supplying about one third of total electric power usage is now required for further upgrading of its economics under regulation relaxation of electric power business. And, under execution retardation of its new planning plant, it becomes important to operate the already established plants for longer term and to secure their stability. Therefore, technical development in response to the plant life elongation is promoted under cooperation of the Ministry of Economics and Industries, electric power companies, literate, and plant manufacturers. Under such conditions, the Hitachi, Ltd. has progressed some technical developments on check inspection, repairs and maintenance for succession of the already established nuclear power plants for longer term under securing of their safety and reliability. And in future, by proposing the check inspection and maintenance program combined with these technologies, it is planned to exert promotion of maintenance program with minimum total cost from a viewpoint of its plant life. Here were described on technologies exerted in the Hitachi, Ltd. such as construction of plant maintenance program in response to plant life elongation agreeing with actual condition of each plant, yearly change mechanism grasping, life evaluation on instruments and materials necessary for maintenance, adequate check inspection, repairs and exchange, and so forth. (G.K.)

  8. Breaker Maintenance: Volume 3, Molded-Case circuit breakers

    International Nuclear Information System (INIS)

    Davis, E.L.; Funk, D.L.

    1991-09-01

    Modeled-case circuit breakers (MCCBs) provide power and circuit protection in nuclear plant electrical distribution systems. Thus, their proper operation is essential to the safe and reliable operation of plant electrical distribution systems. This guide for both nuclear and non-nuclear power generating facilities will help improve the maintenance and reliability of MCCBs. The authors developed this guide to establish a working-level understanding of hardware performance trends, reliability, and failure modes from which maintenance practices could be specified. The first step in preparing this guide was an in-depth review of available operating experience and failure data, which was obtained from nuclear information sources such as EPRI's Nuclear Maintenance Applications Center. In addition, they evaluated some nonnuclear reliability data. Next, they investigated current industry practices, including a review of manufacturer's recommendations and numerous industry standards. Finally, they used the collective information to develop programmatic recommendations and, where appropriate, detailed inspection and test guidance. This guide offers many recommendations applicable to MCCB maintenance, such as an engineering description of MCCBs and their operation; an overview of reliability and failure data; programmatic recommendations, including inspection and test periodicity; detailed inspection and test guidance; and corrective maintenance recommendations. Supplementary information includes an overview of industry standards, a discussion of regulatory issues, and sample data sheets. An evaluation of operating experience indicates that a maintenance program need not be overly complicated to detect the predominant failure modes associated with MCCBs. Those implementating an MCCB maintenance and testing program, however, must recognize the inherent limitations associated with field-testing of these devices. 42 refs., 17 figs., 7 tabs

  9. Final Report on the Operation and Maintenance Improvement Program for Concentrating Solar Power Plants

    International Nuclear Information System (INIS)

    Cohen, Gilbert E.; Kearney, David W.; Kolb, Gregory J.

    1999-01-01

    This report describes the results of a six-year, $6.3 million project to reduce operation and maintenance (O ampersand M) costs at power plants employing concentrating solar power (CSP) technology. Sandia National Laboratories teamed with KJC Operating Company to implement the O ampersand M Improvement Program. O ampersand M technologies developed during the course of the program were demonstrated at the 150-MW Kramer Junction solar power park located in Boron, California. Improvements were made in the following areas: (a) efficiency of solar energy collection, (b) O ampersand M information management, (c) reliability of solar field flow loop hardware, (d) plant operating strategy, and (e) cost reduction associated with environmental issues. A 37% reduction in annual O ampersand M costs was achieved. Based on the lessons learned, an optimum solar- field O ampersand M plan for future CSP plants is presented. Parabolic trough solar technology is employed at Kramer Junction. However, many of the O ampersand M improvements described in the report are also applicable to CSP plants based on solar power tower or dish/engine concepts

  10. Final Report on the Operation and Maintenance Improvement Program for Concentrating Solar Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Cohen Gilbert E.; Kearney, David W.; Kolb, Gregory J.

    1999-06-01

    This report describes the results of a six-year, $6.3 million project to reduce operation and maintenance (O&M) costs at power plants employing concentrating solar power (CSP) technology. Sandia National Laboratories teamed with KJC Operating Company to implement the O&M Improvement Program. O&M technologies developed during the course of the program were demonstrated at the 150-MW Kramer Junction solar power park located in Boron, California. Improvements were made in the following areas: (a) efficiency of solar energy collection, (b) O&M information management, (c) reliability of solar field flow loop hardware, (d) plant operating strategy, and (e) cost reduction associated with environmental issues. A 37% reduction in annual O&M costs was achieved. Based on the lessons learned, an optimum solar- field O&M plan for future CSP plants is presented. Parabolic trough solar technology is employed at Kramer Junction. However, many of the O&M improvements described in the report are also applicable to CSP plants based on solar power tower or dish/engine concepts.

  11. Maintenance Resources Evaluation Technique.

    Science.gov (United States)

    1999-03-01

    variable Z; P-6 BIBLIOGRAPHY Argentine Air Force. Reglamento de Conduction Logistica RAC 9 (Logistics Management Regulation). Estado Mayor General de ...other hand, too many resources are expensive to acquire and maintain and difficult to transport . 1-1 Sizing the means needed to accomplish its...functional areas (maintenance, supply/inventory, transportation , etc), methodologies of operations research (simulation, mathematical programming

  12. Initiating stochastic maintenance optimization at Candu Power Plants

    International Nuclear Information System (INIS)

    Doyle, E.K.

    2003-01-01

    As previously reported at ICONE 6 in New Orleans (1996), the use of various innovative maintenance optimization techniques at Bruce has lead to cost effective preventive maintenance applications for complex systems. Further cost refinement of the station maintenance strategy is being evaluated via the applicability of statistical analysis of historical failure data. Since the statistical evaluation was initiated in 1999 significant progress has been made in demonstrating the viability of stochastic methods in Candu maintenance. Some of the relevant results were presented at ICONE 10 in Washington DC (2002). Success with the graphical displays and the relatively easy to implement stochastic computer programs was sufficient to move the program along to the next significant phase. This next phase consists of investigating the validity of using subjective elicitation techniques to obtain component lifetime distributions. This technique provides access to the elusive failure statistics, the lack of which is often referred to in the literature as the principle impediment preventing the use of stochastic methods in large industry. At the same time the technique allows very valuable information to be captured from the fast retiring 'baby boom generation'. Initial indications have been quite positive. (author)

  13. Second Line of Defense Help Desk: Electronic Maintenance Reports - Local Maintenance Provider User Guide Rev. 1

    Energy Technology Data Exchange (ETDEWEB)

    Leigh, Richard J.

    2011-12-14

    The Electronic Maintenance Report forms present a uniform dataset for analysis of Sustainability metrics. These forms collect readily minable data while allowing the attachment of site-specific checklists or other supporting files for review by the Sustainability Manager and Program Management.

  14. Advanced remote handling for future applications: The advanced integrated maintenance system

    International Nuclear Information System (INIS)

    Herndon, J.N.; Kring, C.T.; Rowe, J.C.

    1986-01-01

    The Consolidated Fuel Reprocessing Program at Oak Ridge National Laboratory has been developing advanced techniques for remote maintenance of future US fuel reprocessing plants. The developed technology has a wide spectrum of application for other hazardous environments. These efforts are based on the application of teleoperated, force-reflecting servomanipulators for dexterous remote handling with television viewing for large-volume hazardous applications. These developments fully address the nonrepetitive nature of remote maintenance in the unstructured environments encountered in fuel reprocessing. This paper covers the primary emphasis in the present program; the design, fabrication, installation, and operation of a prototype remote handling system for reprocessing applications, the Advanced Integrated Maintenance System

  15. 25 CFR 39.1203 - Future consideration of contract school operation and maintenance funding.

    Science.gov (United States)

    2010-04-01

    ... EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Contract School Operation and Maintenance Fund § 39.1203 Future consideration of contract school operation and maintenance funding. The Assistant Secretary shall arrange for full funding for operation and maintenance of contract schools by fiscal year 1981. ...

  16. Evaluation System and Implementation Countermeasure of Automobile Green Maintenance

    Science.gov (United States)

    Zhang, Fei; Xie, Xinxin; Yan, Chaoyong

    2018-01-01

    Green maintenance research is in the beginning of our country, the work is being explored. Based on the existing research results at home and abroad, this paper learns and draws lessons from the experiences and lessons of foreign advanced countries and domestic advanced enterprises. In the face of the challenges brought by economic development and energy saving and emission reduction, this paper discusses the green maintenance theory and security system, And the research status of green maintenance content and system at home and abroad, through the deletion and selection of green maintenance index, through the AHP method to determine the green evaluation criteria, and the introduction of C equivalent evaluation system, the use of fuzzy synthesis Evaluation method to build a green maintenance evaluation model, and the actual validation, put forward the implementation of green maintenance feasibility programs and related security recommendations, vehicle maintenance enterprises to carry out green maintenance, improve business efficiency and reduce environmental management costs to provide theoretical basis. And to achieve effective reduction of environmental pollution, reduce maintenance costs of the target, a reasonable promotion of maintenance and environmental protection and sustainable development. Promote green maintenance from research to practice, from the laboratory to the maintenance of enterprises, from the pilot to the overall development and transformation.

  17. Cost effective maintenance to supply end user value: Visionary or utopian

    NARCIS (Netherlands)

    Wessels, J.; Alten, K.; Turk, M.R.; Palić, S.Š.

    2013-01-01

    Infrastructure stakeholders expect maintenance managers to deliver acceptable End User Service Levels (EUSL), such as availability, comfort, and safety. Means of controlling these requirements involve technical maintenance and operative measures. Within the ERANET Road Program 'Effective asset

  18. Status of maintenance in the US nuclear power industry 1985. Volume 1. Findings and conclusions

    International Nuclear Information System (INIS)

    1986-06-01

    This report presents the findings, conclusions and recommendations derived from activities performed under Phase I of the NRC Maintenance and Surveillance Program (MSP). Findings are based on trends and patterns derived from operational data compiled by the NRC for the period 1980 through 1985, site surveys conducted at eight plants, and questionnaires administered to NRC Resident Inspectors to characterize nuclear power plant maintenance programs and practices. These activities have shown that plant maintenance programs and practices are highly variable from plant-to-plant and are currently undergoing major changes. While measured plant performance has improved overall since 1980, the maintenance-related contribution to reportable events and challenges to safety systems remains high and is increasing by some measures. The findings of Phase I of the MSP confirmed a number of problems in nuclear power plant maintenance which warrant further NRC and industry attention

  19. Trend analysis in the nuclear maintenance industry

    International Nuclear Information System (INIS)

    Ruemeli, W.A.

    1986-01-01

    The maintenance of nuclear facilities is a demanding, ongoing activity which requires the same level of quality as new construction. Heretofore, many owners and contractors have relied on ''gut feel'' to determine whether maintenance quality was improving or not. However, trend analysis now is becoming a key factor in monitoring plant activities to ensure quality. Literature abounds with descriptions of computerized systems for collecting and sorting data. Even the Nuclear Regulatory Commission (NRC) has concurred, with its endorsement of trend analysis of construction indicators in NUREG 1055 (Ford Amendment Study). Stearns Catalytic has developed a unique system of tend analyses for nuclear plant activities. Aside from its intended purpose of determining the quality trends in maintenance activities, the program also supplies substantial quantitative data for control and management of the quality activities. Trend analysis is a time series analysis of a set of observations arranged in chronological order. The important aspect is the time basis, specifically the analysis of quality indicators over successive periods of time. Many program elements, including surveillances, nonconformances, inspections, and audits, are designed to look at quality indications

  20. Surface Moisture Measurement System Operation and Maintenance Manual

    International Nuclear Information System (INIS)

    Ritter, G.A.; Pearce, K.L.; Stokes, T.L.

    1995-12-01

    This operations and maintenance manual addresses deployment, equipment and field hazards, operating instructions, calibration verification, removal, maintenance, and other pertinent information necessary to safely operate and store the Surface Moisture Measurement System (SMMS) and Liquid Observation Well Moisture Measurement System (LOWMMS). These systems were developed primarily in support of Tank Waste Remediation System (TWRS) Safety Programs for moisture measurement in organic and ferrocyanide watch list tanks

  1. Annual summary report on surveillance and maintenance activities of the surplus contaminated facilities program at Oak Ridge National Laboratory for period ending September 30, 1991

    International Nuclear Information System (INIS)

    Cannon, T.R.; Ford, M.K.; Holder, L. Jr.

    1991-09-01

    The Surplus Contaminated Facilities Program (SCFP) was established at the Oak Ridge National Laboratory (ORNL) in 1985 to provide support for inactive contaminated facilities that were largely abandoned by the programs which they formerly served. This support provides for routine surveillance and maintenance (S ampersand M) and special projects beyond a routine nature when such actions are needed to ensure adequate protection of personnel or the environment. The facilities included in the program had been used for research, technology development, isotope production and processing, and waste management. Support for facilities in the SCFP has previously been provided by the Department of Energy's (DOE's) Office of Energy Research: Multiprogram Energy Laboratories -- Facilities Support (ERKG) because of multiprogram use of the facilities or because of the landlord responsibility of Energy Research. Recently, an integrated Decontamination and Decommissioning (D ampersand D) program within the DOE Office of Environmental Restoration and Waste Management has been established to collectively manage the former Surplus Facilities Management Program, Defense D ampersand D Program, and the KG-funded, ORNL-originated SCFP. This report gives an overview of the S ampersand M planning, routine S ampersand M, and special maintenance project activities which have occurred at the SCFP facilities during the 1991 Fiscal Year

  2. A remote maintenance robot system for a pulsed nuclear reactor

    International Nuclear Information System (INIS)

    Thunborg, S.

    1987-01-01

    This paper presents a remote maintenance robot system for use in a hazardous environment. The system consists of turntable, robot and hoist subsystems which operate under the control of a supervisory computer to perform coordinated programmed maintenance operations on a pulsed nuclear reactor. The system is operational

  3. Maintenance - a design perspective

    International Nuclear Information System (INIS)

    Hedges, K.R.

    1992-01-01

    The paper describes how the CANDU-3 has incorporated, at the design stage, maintenance requirements such as component accessibility, standardization, ease of replacement, reduction in the number of components, and simplified component design. AECL is also active in the planned rehabilitation of the four units at Ontario Hydro's Bruce A nuclear generating station. In addition to conceptual design and development, detailed design and analysis, procurement and site assistance, AECL's Sheridan Park Laboratory will provide important development and mockup facilities. An AECL research and development program on reactor maintenance includes the identification and characterization of aging and degrading mechanisms, the tailoring of developed products to plant requirements, and the identification of areas of international cooperation and information exchange. 3 tabs., 1 fig

  4. Maintenance of Certification®, Maintenance of Public Trust

    Science.gov (United States)

    Chung, Kevin C.; Clapham, Philip J.; Lalonde, Donald H.

    2010-01-01

    The Maintenance of Certification® (MOC) program has been well received by many physicians, but faced significant opposition from others, who complain that it is overly tedious, costly, and irrelevant to their practice. This article offers a consolidated and concise history of the MOC program and a summary of what plastic surgeons need to know to successfully complete the American Board of Plastic Surgery’s (ABPS) own MOC requirements. The authors have justified each step of the ABPS’s MOC process in terms of how it improves the quality of care delivered to Plastic Surgery patients. Finally, a summary of research is presented that demonstrates both that the public supports the MOC process for all physicians and that continuing education and formal assessment and improvement initiatives have been linked in multiple studies to a better and more evidence-based medical practice. PMID:21285803

  5. Maintenance of remote reconnaissance vehicle

    International Nuclear Information System (INIS)

    Schein, D.C.

    1985-01-01

    A description is provided of the maintenance program developed for remote reconnaissance vehicles, such as RRV-1, in use at the Three Mile Island Unit 2. The described approach, which is simple, effective, and flexible, helped to make the effort successful. It will be applied to future projects

  6. Demonstration of reliability centered maintenance

    International Nuclear Information System (INIS)

    Schwan, C.A.; Morgan, T.A.

    1991-04-01

    Reliability centered maintenance (RCM) is an approach to preventive maintenance planning and evaluation that has been used successfully by other industries, most notably the airlines and military. Now EPRI is demonstrating RCM in the commercial nuclear power industry. Just completed are large-scale, two-year demonstrations at Rochester Gas ampersand Electric (Ginna Nuclear Power Station) and Southern California Edison (San Onofre Nuclear Generating Station). Both demonstrations were begun in the spring of 1988. At each plant, RCM was performed on 12 to 21 major systems. Both demonstrations determined that RCM is an appropriate means to optimize a PM program and improve nuclear plant preventive maintenance on a large scale. Such favorable results had been suggested by three earlier EPRI pilot studies at Florida Power ampersand Light, Duke Power, and Southern California Edison. EPRI selected the Ginna and San Onofre sites because, together, they represent a broad range of utility and plant size, plant organization, plant age, and histories of availability and reliability. Significant steps in each demonstration included: selecting and prioritizing plant systems for RCM evaluation; performing the RCM evaluation steps on selected systems; evaluating the RCM recommendations by a multi-disciplinary task force; implementing the RCM recommendations; establishing a system to track and verify the RCM benefits; and establishing procedures to update the RCM bases and recommendations with time (a living program). 7 refs., 1 tab

  7. The advantages of reliability centered maintenance for standby safety systems

    International Nuclear Information System (INIS)

    Dam, R.F.; Ayazzudin, S.; Nickerson, J.H.; DeLong, A.I.

    2002-01-01

    Full text: On standby safety systems, nuclear plants have to balance the requirements of demonstrating the reliability of each system, while maintaining the system and plant availability. With the goal of demonstrating statistical reliability, these systems have extensive testing programs, which often makes the system unavailable and this can impact the plant capacity. The inputs to the process are often safety and regulatory related, resulting in programs that provide a high level of scrutiny on the systems being considered. In such cases, the value of the application of a maintenance optimization strategy, such as Reliability Centered Maintenance (RCM), is questioned. Part of the question stems from the use of the word 'Reliability' in RCM, which implies a level of redundancy when applied to a system maintenance program driven by reliability requirements. A deeper look at the RCM process, however, shows that RCM has the goal of ensuring that the system operates 'reliably' through the application of an integrated maintenance strategy. This is a subtle, but important distinction. Although the system reliability requirements are an important part of the strategy evaluation, RCM provides a broader context where testing is only one part of an overall strategy focused on ensuring that component function is maintained through a combination of monitoring technologies (including testing), predictive techniques, and intrusive maintenance strategies. Each strategy is targeted to identify known component degradation mechanisms. The conclusion is that a maintenance program driven by reliability requirements will tend to have testing defined at a frequency intended to support the needed statistics. The testing demonstrates that the desired function is available today. Maintenance driven by functional requirements and known failure causes, as developed through an RCM assessment, will have frequencies tied to industry experience with components and rely on a higher degree of

  8. Prioritising alternatives for maintenance of water distribution ...

    African Journals Online (AJOL)

    2012-06-26

    Jun 26, 2012 ... This study aimed to support a group decision-making process in the maintenance ... program to prioritise alternatives, simultaneously taking into account .... compensatory method that requires inter-criterion information.

  9. Cost Analysis of Maintenance Programs for Pre-Positioned War Reserve Material Stock (PWRMS)

    National Research Council Canada - National Science Library

    Cyr, Phillip

    2002-01-01

    ...) for that maintenance. The objective is to provide DoD, the Navy, and the Civil Engineer Corps a guideline and possible benchmark for maintenance costs required to maintain the CESE War Reserves in a Cl condition of readiness...

  10. The relationship between substance use and posttraumatic stress disorder in a methadone maintenance treatment program.

    Science.gov (United States)

    Villagonzalo, Kristi-Ann; Dodd, Seetal; Ng, Felicity; Mihaly, Stephen; Langbein, Amy; Berk, Michael

    2011-01-01

    Posttraumatic stress disorder (PTSD) is frequently linked with substance abuse. The self-medication hypothesis suggests that some people may use illicit substances in an attempt to self-treat psychiatric symptoms. This study explores the relationship between substance abuse and PTSD symptom clusters in a methadone maintenance population. Clients of a methadone maintenance program at a public Drug and Alcohol Service were invited to complete the PTSD Checklist-Civilian Version, a screening tool for PTSD. Information about their history of substance use was also collected. Eighty clients (43 female, 37 male), aged 35 ± 8.0 years (mean ± SD), participated in the study, of which 52.7% screened positive for PTSD. Severity of marijuana use was significantly associated with a number of reexperiencing and hyperarousal symptoms and with overall severity of PTSD symptoms. Opiate, amphetamine, and benzodiazepine use did not appear to be related to PTSD symptoms. In this sample, marijuana may be used to self-treat certain PTSD symptoms, supporting the self-medication hypothesis. Further research is required to confirm the association between a diagnosis of PTSD and substance use. Given the high prevalence of PTSD in the substance-using population, routine PTSD screening in the substance abuse treatment setting may be justified. Copyright © 2011 Elsevier Inc. All rights reserved.

  11. Seminar-meeting on maintenance of nuclear instruments, 24 October -3 November 1980, Quezon City, Philippines

    International Nuclear Information System (INIS)

    Anon.

    1980-01-01

    This collection is composed of twenty (20) papers on the repair, maintenance and maintenance plans, of nuclear instruments, training programs for maintenance technicians, and experiences in the maintenance of nuclear instruments in Indonesia, Japan, Philippines, India, Thailand, Sri Lanka, Pakistan, Korea and Malaysia. (author)

  12. An Introduction to Quantitative Measures for Software Maintenance of Nuclear Power Plant

    International Nuclear Information System (INIS)

    Jo, Hyun Jun; Seong, Poong Hyun

    2007-01-01

    The I and C system of NPP has changed from the analog system to the digital-based system using microcontrollers and software. Thus, software has become very important for NPP control system. The software life cycle is divided into the development and maintenance phase largely. Because poor software maintenance work introduces new errors and makes software much complex, we have to consider the effective maintenance methods for the reliability and maintainability of NPP software. Function Block Diagram (FBD) is a standard application programming language for the Programmable Logic Controller (PLC) and currently being used in the development of a fully-digitalized reactor protection system (RPS) under the KNICS project. Therefore, the maintenance work will be of great importance in a few years. This paper studies on the measures which give quantitative information to software maintainer and manager before and after modification. The remainder of this paper is organized as follows. Section 2 briefly describes software maintenance types and model. In Section 3-5, we introduce the quantitative measures for software maintenance and characteristics of FBD program. A conclusion is provided in Section 6

  13. Beyond AIRSpeed: How Organizational Modeling and Simulation Further Reduced Engine Maintenance Time

    National Research Council Canada - National Science Library

    Hagan, Joel; Slack, William; Zolin, Roxanne; Dillard, John

    2007-01-01

    The Aircraft Intermediate Maintenance Division (AIMD) at Naval Air Station (NAS) Lemoore, CA, has worked aggressively to reduce engine maintenance time using the tools of the NAVAIR Enterprise AiRSpeed (AiRSpeed) program...

  14. Experience based reliability centered maintenance

    International Nuclear Information System (INIS)

    Haenninen, S.; Laakso, K.

    1993-03-01

    The systematic analysis and documentation of operating experiences should be included in a living NPP life management program. Failure mode and effects and maintenance effects analyses are suitable methods for analysis of the failure and corrective maintenance experiences of equipment. Combined use of the information on occurred functional failures and the decision tree logic of the reliability centered maintenance identifies applicable and effective preventive maintenance tasks of equipment in an old plant. In this study the electrical motor drives of closing and isolation valves (MOV) of TVO and Loviisa nuclear power plants were selected to serve as pilot study objects. The study was limited to valve drives having actuators manufactured by AUMA in Germany. The fault and maintenance history of MOVs from 1981 up to and including October 1991 in different safety and process systems at TVO 1 and 2 nuclear power units was at first analyzed in a systematic way. The scope of the components studied was 81 MOVs in safety-related systems and 127 other MOVs per each TVO unit. In the case of the Loviisa plant, the observation period was limited to three years, i.e. from February 1989 up to February 1992. The scope of the Loviisa 1 and 2 components studied was 44 respectively 95 MOVs. (25 refs., 22 figs., 8 tabs.)

  15. A reliability program for emergency diesel generators at nuclear power plants: Maintenance, surveillance, and condition monitoring

    International Nuclear Information System (INIS)

    Lofgren, E.V.; Henderson, W.; Burghardt, D.; Kripps, L.; Rothleder, B.

    1988-12-01

    This report is a companion report on NUREG/CR-5078, Volume 1, ''A Reliability Program for Emergency Diesel Generators at Nuclear Power Plants: Program Structure.'' The purpose of this report is to provide technical findings and insights related to: failure evaluation, troubleshooting, maintenance, surveillance, and condition monitoring. Examples and recommendations are provided for each of these areas based on actual emergency diesel generator (EDG) operating experience and the opinions of diesel generator experts. This report expands the more general guidance provided in Volume 1. In addition, a discussion of EDG interactions with other plant systems (e.g., instrument, air, service water, dc power) is provided since experience has shown that these support systems and their operation can adversely affect EDG reliability. Portions of this report have been designed for use by onsite personnel for evaluating operational characteristics of EDGs. 5 refs., 8 figs., 7 tabs

  16. Inspection of licensee - Maintenance programme and activities

    International Nuclear Information System (INIS)

    2013-01-01

    An effective maintenance programme is critical to sustained safe and reliable operation of nuclear power plants. The Working Group on Inspection Practices (WGIP) concluded that when a licensee has an effective maintenance programme, the overall operating safety of the plant is improved and the protection of public health and safety enhanced. All Regulatory Bodies (RB) consider maintenance to be an important area for oversight. Although a variety of inspection practices are being used; RB are actively monitoring licensee performance. Specifically the following conclusions were reached and commendable practices identified: - Maintenance oversight by regulators appears to be in a stable continuous improvement state. Most regulators are executing inspection oversight based on an existing regulatory framework. - The performance of a licensee's maintenance programme is recognized as important part of maintaining nuclear safety. The result of the maintenance program assessment is included in the overall performance assessment of a license. - Maintenance inspection activities are recognized as an important part of the regulatory oversight process. Inspection activities are based on the safety significance and nature of work being performed by the licensee. - The effectiveness of the maintenance inspection activities is recognized to rely on properly qualified inspectors; who are adequately supported by specialists. Training and qualification of inspectors should be based on how the RB reviews and inspects licensee maintenance programmes. - Reporting requirements are identified to provide information on the licensees maintenance programme, and to help guide inspection activities. - Performance Indicators are recognized as a useful tool for helping focus regulatory activities. Basic PI are identified and tracked by the RB, and use of PI by the licensee is monitored. - Inspections are designed to confirm that the licensee is planning and scheduling maintenance with due

  17. Predictive maintenance technology development at G.A. Siwabessy multipurpose reactor

    Energy Technology Data Exchange (ETDEWEB)

    Jupiter Sitorus Pane; Imron, M.; Sapto Hartoko; Sentot Alibasya Harahap [Multipurpose Research Reactor G.A. Siwabessy, National Nuclear Energy Agency (Indonesia)

    1999-10-01

    Safe operation of reactor is certainly influenced by condition of system and component equipped to the reactor's system. In order to maintain the condition of that systems and components, RSG-GAS has arranged maintenance program with time-basis. All 6 (six) groups of reactor systems are maintained within interval of weekly, monthly, three monthly, six-monthly, yearly, five-yearly appropriately. The experience showed that event though the maintenance was performed persistently, the condition of system and component are still not able to determine exactly. The possibility of accidental failure is open since the failure factor are varied and complicated. In order to limit an uncertainty of the component condition a based maintenance shall be introduced. An infrared investigation and manual vibration analysis had been used to diagnose the condition of some RSG-GAS' components. In addition, other alternative technology for predictive maintenance was developed. It is started by computerizing the database maintenance and doing historical review for its aging management, and developing data acquisition and processing equipment using Lab View computer program for collecting and processing signal data from dynamics system. This paper describes briefly the status of those development results. (author)

  18. Predictive maintenance technology development at G.A. Siwabessy multipurpose reactor

    International Nuclear Information System (INIS)

    Jupiter Sitorus Pane; Imron, M.; Sapto Hartoko; Sentot Alibasya Harahap

    1999-01-01

    Safe operation of reactor is certainly influenced by condition of system and component equipped to the reactor's system. In order to maintain the condition of that systems and components, RSG-GAS has arranged maintenance program with time-basis. All 6 (six) groups of reactor systems are maintained within interval of weekly, monthly, three monthly, six-monthly, yearly, five-yearly appropriately. The experience showed that event though the maintenance was performed persistently, the condition of system and component are still not able to determine exactly. The possibility of accidental failure is open since the failure factor are varied and complicated. In order to limit an uncertainty of the component condition a based maintenance shall be introduced. An infrared investigation and manual vibration analysis had been used to diagnose the condition of some RSG-GAS' components. In addition, other alternative technology for predictive maintenance was developed. It is started by computerizing the database maintenance and doing historical review for its aging management, and developing data acquisition and processing equipment using Lab View computer program for collecting and processing signal data from dynamics system. This paper describes briefly the status of those development results. (author)

  19. Monitoring well inspection and maintenance plan Y-12 Plant, Oak Ridge, Tennessee (revised)

    International Nuclear Information System (INIS)

    1996-09-01

    Inspection and maintenance of groundwater monitoring wells is a primary element of the Oak Ridge Y-12 Plant Groundwater Protection Program (GWPP). This document is the revised groundwater monitoring well inspection and maintenance plan for the U.S. Department of Energy (DOE) Y-12 Plant in Oak Ridge, Tennessee. The plan provides a systematic program for: (1) inspecting the physical condition of monitoring wells at the Y-12 Plant and (2) identifying maintenance needs that will extend the life of each well and ensure that representative groundwater quality samples and hydrologic data are collected from the wells. Original documentation for the Y-12 Plant GWPP monitoring well inspection and maintenance program was provided in HSW, Inc. 1991a. The original revision of the plan specified that only a Monitoring Well Inspection/Maintenance Summary need be updated and reissued each year. Rapid growth of the monitoring well network and changing regulatory requirements have resulted in constant changes to the status of wells (active or inactive) listed on the Monitoring Well Inspection/Maintenance Summary. As a result, a new mechanism to track the status of monitoring wells has been developed and the plan revised to formalize the new business practices. These changes are detailed in Sections 2.4 and 2.5

  20. Early arrival waveform inversion of shallow seismic land data

    KAUST Repository

    Hanafy, Sherif M.; Yu, Han

    2013-01-01

    , compared to traveltime tomography, EWI can generate a highly resolved velocity tomogram from shallow seismic data. The more accurate EWI tomogram can make an economically important difference in assessing the storage potential of this wadi; in this case we

  1. Preventive and corrective maintenance for MINT EPS 3000 electron beam machine

    International Nuclear Information System (INIS)

    Siti Aiasah Hashim; Shaari Jahar

    2005-01-01

    Preventive and corrective maintenance of a high energy electron is to ensure that the machine would not fail during operation. MINT's EPS 3000 electron beam machine has been in operation for almost 12 years. Throughout those years, events relating to scheduled overhauls and unscheduled corrective maintenance had provided invaluable experience in the form of informal maintenance training to the operators. With the implementation of ISO 9001:2000 Quality Management System at the facility, the preventive and corrective maintenance program is becoming more structured and orderly. Collected maintenance data shall be used to initiate continual improvement activities in the facility.This paper describes MINT-ALURTRON's 12 years experience in providing maintenance work for the EPS 3000. (Author)

  2. Technical information report: Plasma melter operation, reliability, and maintenance analysis

    International Nuclear Information System (INIS)

    Hendrickson, D.W.

    1995-01-01

    This document provides a technical report of operability, reliability, and maintenance of a plasma melter for low-level waste vitrification, in support of the Hanford Tank Waste Remediation System (TWRS) Low-Level Waste (LLW) Vitrification Program. A process description is provided that minimizes maintenance and downtime and includes material and energy balances, equipment sizes and arrangement, startup/operation/maintence/shutdown cycle descriptions, and basis for scale-up to a 200 metric ton/day production facility. Operational requirements are provided including utilities, feeds, labor, and maintenance. Equipment reliability estimates and maintenance requirements are provided which includes a list of failure modes, responses, and consequences

  3. Development of a maintenance manipulator for TFTR

    International Nuclear Information System (INIS)

    Holloway, C.

    1986-01-01

    The maintenance manipulator is a device permanently connected to the Tokamak Fusion Test Reactor (TFTR) vacuum vessel and is located in close proximity to the tokamak. It is used for the inspection and maintenance of in-vessel components whilst the machine remains under vacuum. The total system comprises a vacuum vessel ante-chamber that houses the manipulator, an articulated boom and carriage that transports and positions a dexterous end-effector, and end-effector that supports maintenance tooling, and an inspection system. Because of the maintenance manipulator's operating environment, there are many challenging engineering features, i.e., temperatures up to 150 0 C, changing magnetic fields in space and time that act on the manipulator whilst it is at rest, neutron neutron fluxes of up to 10/sup 11/cm/sup -2/s/sup -1/, and, last but not least, UHV conditions. This paper describes the development of the vacuum system, the maintenance manipulator, and inspective devices. It includes the methods employed to overcome the engineering difficulties and the application of information gained from other advanced technology programs, such as space and nuclear fission

  4. Building Maintenance: Introduction. Units of Instruction. Teacher's Guide. First Edition.

    Science.gov (United States)

    Barnes, Bill

    This volume, the first in a series of publications that will provide entry-level competencies in the area of building maintenance, is designed as an introduction. The seven instructional units cover these areas in the shop program: (1) introduction to building maintenance, (2) leadership development, (3) personal development, (4) job application…

  5. Honolulu Community College Program Health Indicators: 2000-2001 Program Reviews.

    Science.gov (United States)

    Hawaii Univ., Honolulu. Honolulu Community Coll.

    This report presents an overall health summation of 21 programs offered at Honolulu Community College (Hawaii) during 2000-2001. The programs profiled are: (1) Auto Body Repair and Painting; (2) Aeronautics Maintenance Technology; (3) Administration of Justice; (4) Automotive Mechanics Technology; (5) Boat Maintenance Repair; (6) Carpentry; (7)…

  6. Principles of MONJU maintenance. Characteristic of MONJU maintenance and reflection of LWR maintenance experience to FBR

    International Nuclear Information System (INIS)

    Nakai, Satoru; Nishio, Ryuichi; Uchihashi, Masaya; Kaneko, Yoshihisa; Yamashita, Hironobu; Yamaguchi, Atsunori; Aoki, Takayuki

    2014-01-01

    A sodium cooled fast breeder reactor (FBR) has unique systems and components and different degradation mechanism from light water reactor (LWR) so that need to establish maintenance technology in accordance with its features. The examination of the FBR maintenance technology is carried out in the special committee for considering the maintenance for Monju established in the Japan Society of Maintenology (JSM). As a result of the study such as extraction of Monju maintenance feature, maintenance technology benchmark between Monju and LWR components and survey of LWR maintenance experience, it is clear that principles of maintenance are same as LWR, necessity of LWR maintenance experience reflection and points to be considered in Monju maintenance. The road map to establish a FBR maintenance technology in the technical aspect became clear and it is vital to acquire operation and maintenance experience of the plant to implement this road map, and to establish a fast reactor maintenance. (author)

  7. Measurement and control system for ITER remote maintenance equipment

    Energy Technology Data Exchange (ETDEWEB)

    Oka, Kiyoshi; Kakudate, Satoshi; Takeda, Nobukazu; Takiguchi, Yuji; Akou, Kentaro [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-04-01

    ITER in-vessel components such as blankets and divertors are categorized as scheduled maintenance components because they are subjected to severe plasma heat and particle loads. Blanket maintenance requires remote handling equipment and tools able to handle Heavy payloads of about 4 tons within a 2 mm precision tolerance. Divertor maintenance requires remote replacement of 60 cassettes with a dead weight of about 25 tons each. In the ITER R and D program, full-scale remote handling equipment for blanket and divertor maintenance has been designed and assembled for demonstration tests. This paper reviews the measurement and control system developed for full-scale remote handling equipment, the Japan Home Team contribution. (author)

  8. Measurement and control system for ITER remote maintenance equipment

    International Nuclear Information System (INIS)

    Oka, Kiyoshi; Kakudate, Satoshi; Takeda, Nobukazu; Takiguchi, Yuji; Akou, Kentaro

    1998-01-01

    ITER in-vessel components such as blankets and divertors are categorized as scheduled maintenance components because they are subjected to severe plasma heat and particle loads. Blanket maintenance requires remote handling equipment and tools able to handle Heavy payloads of about 4 tons within a 2 mm precision tolerance. Divertor maintenance requires remote replacement of 60 cassettes with a dead weight of about 25 tons each. In the ITER R and D program, full-scale remote handling equipment for blanket and divertor maintenance has been designed and assembled for demonstration tests. This paper reviews the measurement and control system developed for full-scale remote handling equipment, the Japan Home Team contribution. (author)

  9. The role of knowledge sharing and transactive memory system on condition based maintenance policy

    NARCIS (Netherlands)

    Koochaki, J.; Bouwhuis, I. M.

    2008-01-01

    Today, Condition Based Maintenance (CBM) has reached a sophisticated level in industry and the advantages of predictive maintenance are accepted globally. However, although lots of effort has been put into improving methods and techniques in CBM, most of predictive maintenance programs fail to

  10. Application and issues of online maintenance for equipment of nuclear power plants

    International Nuclear Information System (INIS)

    Higasa, Hisakazu

    2011-01-01

    The maintenance systems for long-term safety and repair costs reduction of equipment of nuclear power plants are stated. Planned maintenance contained the breakdown maintenance (BM) and the preventive maintenance, which consists of the time based maintenance (MBM) and the condition based maintenance (CBM). Explained are the characteristics of equipments, maintenance methods, maintenance solutions and the self-evaluation maintenance power, damage mechanism and solutions, and monitoring tools and application. Stated are the maintenance system and application of monitoring technology, periodical maintenance, application of diagnosis, vibration monitoring techniques, decision of vibration monitoring, and application of monitoring techniques for improvement of maintenance. Illustrated are realization of planned maintenance by reorganization of maintenance, a trend of maintenance of equipments, table of classified maintenance systems, change of maintenance program, maintenance data and investigation of damage mechanism, examples of self-evaluation maintenance power, examples of analysis of damage of parts of equipments, evaluation of rotating machines by vibration method, examples of results of diagnosis of bearing of rotating machines, online maintenance system of Asahi Kasei Engineering Corporation, degradation pattern of pomp, estimation of lifetime by total vibration and vibration on acceleration, and improvement of equipments. (S.Y.)

  11. Fatty acid oxidation is required for active and quiescent brown adipose tissue maintenance and thermogenic programing.

    Science.gov (United States)

    Gonzalez-Hurtado, Elsie; Lee, Jieun; Choi, Joseph; Wolfgang, Michael J

    2018-01-01

    To determine the role of fatty acid oxidation on the cellular, molecular, and physiologic response of brown adipose tissue to disparate paradigms of chronic thermogenic stimulation. Mice with an adipose-specific loss of Carnitine Palmitoyltransferase 2 (Cpt2 A-/- ), that lack mitochondrial long chain fatty acid β-oxidation, were subjected to environmental and pharmacologic interventions known to promote thermogenic programming in adipose tissue. Chronic administration of β3-adrenergic (CL-316243) or thyroid hormone (GC-1) agonists induced a loss of BAT morphology and UCP1 expression in Cpt2 A-/- mice. Fatty acid oxidation was also required for the browning of white adipose tissue (WAT) and the induction of UCP1 in WAT. In contrast, chronic cold (15 °C) stimulation induced UCP1 and thermogenic programming in both control and Cpt2 A-/- adipose tissue albeit to a lesser extent in Cpt2 A-/- mice. However, thermoneutral housing also induced the loss of UCP1 and BAT morphology in Cpt2 A-/- mice. Therefore, adipose fatty acid oxidation is required for both the acute agonist-induced activation of BAT and the maintenance of quiescent BAT. Consistent with this data, Cpt2 A-/- BAT exhibited increased macrophage infiltration, inflammation and fibrosis irrespective of BAT activation. Finally, obese Cpt2 A-/- mice housed at thermoneutrality exhibited a loss of interscapular BAT and were refractory to β3-adrenergic-induced energy expenditure and weight loss. Mitochondrial long chain fatty acid β-oxidation is critical for the maintenance of the brown adipocyte phenotype both during times of activation and quiescence. Copyright © 2017 The Authors. Published by Elsevier GmbH.. All rights reserved.

  12. Master--slave manipulators and remote maintenance at the Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Jenness, R.G.; Wicker, C.D.

    1975-01-01

    The volume of master-slave manipulator maintenance at Oak Ridge National Laboratory has necessitated the establishment of a repair facility and the organization of a specially trained group of craftsmen. Emphasis on cell containment requires the use of manipulator boots and the development of precise procedures for accomplishing the maintenance of 283 installed units. To provide the most economical type of preventive maintenance, a very satisfactory computer-programmed maintenance system has been established at the Laboratory. (auth)

  13. Maintenance implementation plan for the Plutonium Finishing Plant. Revision 3

    International Nuclear Information System (INIS)

    Meldrom, C.A.

    1996-03-01

    This document outlines the Maintenance Implementation Plan (MIP) for the Plutonium Finishing Plant (PFP) located at the Hanford site at Richland, Washington. This MIP describes the PFP maintenance program relative to DOE order 4330.4B. The MIP defines the key actions needed to meet the guidelines of the Order to produce a cost-effective and efficient maintenance program. A previous report identified the presence of significant quantities of Pu-bearing materials within PFP that pose risks to workers. PFP's current mission is to develop, install and operate processes which will mitigate these risks. The PFP Maintenance strategy is to equip the facility with systems and equipment able to sustain scheduled PFP operations. The current operating run is scheduled to last seven years. Activities following the stabilization operation will involve an Environmental Impact Statement (EIS) to determine future plant activities. This strategy includes long-term maintenance of the facility for safe occupancy and material storage. The PFP maintenance staff used the graded approach to dictate the priorities of the improvement and upgrade actions identified in Chapter 2 of this document. The MIP documents PFP compliance to the DOE 4330.4B Order. Chapter 2 of the MIP follows the format of the Order in addressing the eighteen elements. As this revision is a total rewrite, no sidebars are included to highlight changes

  14. Maintenance Strategies to Reduce Downtime Due to\\ud Machine Positional Errors

    OpenAIRE

    Shagluf, Abubaker; Longstaff, Andrew P.; Fletcher, Simon

    2014-01-01

    Manufacturing strives to reduce waste and increase\\ud Overall Equipment Effectiveness (OEE). When managing machine tool maintenance a manufacturer must apply an appropriate decision technique in order to reveal hidden costs associated with production losses, reduce equipment downtime\\ud competently and similarly identify the machines’ performance.\\ud Total productive maintenance (TPM) is a maintenance program that involves concepts for maintaining plant and equipment effectively. OEE is a pow...

  15. Effect of job maintenance training program for employees with chronic disease - a randomized controlled trial on self-efficacy, job satisfaction, and fatigue.

    Science.gov (United States)

    Varekamp, Inge; Verbeek, Jos H; de Boer, Angela; van Dijk, Frank J H

    2011-07-01

    Employees with a chronic physical condition may be hampered in job performance due to physical or cognitive limitations, pain, fatigue, psychosocial barriers, or because medical treatment interferes with work. This study investigates the effect of a group-training program aimed at job maintenance. Essential elements of the program are exploration of work-related problems, communication at the workplace, and the development and implementation of solutions. Participants with chronic physical diseases were randomly assigned to the intervention (N=64) or the control group (N=58). Participants were eligible for the study if they had a chronic physical disease, paid employment, experienced work-related problems, and were not on long-term 100% sick leave. Primary outcome measures were self-efficacy in solving work- and disease-related problems (14-70), job dissatisfaction (0-100), fatigue (20-140) and job maintenance measured at 4-, 8-, 12- and 24-month follow-up. We used GLM repeated measures for the analysis. After 24 months, loss to follow-up was 5.7% (7/122). Self-efficacy increased and fatigue decreased significantly more in the experimental than the control group [10 versus 4 points (P=0.000) and 19 versus 8 points (P=0.032), respectively]. Job satisfaction increased more in the experimental group but not significantly [6 versus 0 points (P=0.698)]. Job maintenance was 87% in the experimental and 91% in the control group, which was not a significant difference. Many participants in the control group also undertook actions to solve work-related problems. Empowerment training increases self-efficacy and helps to reduce fatigue complaints, which in the long term could lead to more job maintenance. Better understanding of ways to deal with work-related problems is needed to develop more efficient support for employees with a chronic disease.

  16. Implementation of a Computerized Maintenance Management System

    Science.gov (United States)

    Shen, Yong-Hong; Askari, Bruce

    1994-01-01

    A primer Computerized Maintenance Management System (CMMS) has been established for NASA Ames pressure component certification program. The CMMS takes full advantage of the latest computer technology and SQL relational database to perform periodic services for vital pressure components. The Ames certification program is briefly described and the aspects of the CMMS implementation are discussed as they are related to the certification objectives.

  17. Performance-based inspection and maintenance strategies

    International Nuclear Information System (INIS)

    Vesely, W.E.

    1995-01-01

    Performance-based inspection and maintenance strategies utilize measures of equipment performance to help guide inspection and maintenance activities. A relevant measure of performance for safety system components is component unavailability. The component unavailability can also be input into a plant risk model such as a Probabilistic Risk Assessment (PRA) to determine the associated plant risk performance. Based on the present and projected unavailability performance, or the present and projected risk performance, the effectiveness of current maintenance activities can be evaluated and this information can be used to plan future maintenance activities. A significant amount of information other than downtimes or failure times is collected or can be collected when an inspection or maintenance is conducted which can be used to estimate the component unavailability. This information generally involves observations on the condition or state of the component or component piecepart. The information can be detailed such as the amount of corrosion buildup or can be general such as the general state of the component described as ' high degradation', ' moderate degradation', or ' low degradation'. Much of the information collected in maintenance logs is qualitative and fuzzy. As part of an NRC Research program on performance-based engineering modeling, approaches have been developed to apply Fuzzy Set Theory to information collected on the state of the component to determine the implied component or component piecepart unavailability. Demonstrations of the applications of Fuzzy Set Theory are presented utilizing information from plant maintenance logs. The demonstrations show the power of Fuzzy Set Theory in translating engineering information to reliability and risk implications

  18. Technology Trend in the Maintenance of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Yoon, Kyungsup; Lee, Unjang

    2014-01-01

    In this paper, overall technology evolution is reviewed and the improvements in the plant safety, reliability and productivity are described. And the issue and some recommendation for better maintenance of Korean nuclear power plants are presented as the interim study results on the 'Management and Regulatory Policy for the Nuclear Power Plant Maintenance and Equipment Reliability' under the agreement with the Nuclear Safety and Security Commission. The future trend in the maintenance technologies is also covered. Maintenance is the essential element for the enhancement of plant safety, reliability and economics and also for public safety. Therefore the regulator's involvements and the utility's active participation is inevitable for the better maintenance. For the better sustainability of our nuclear power plants the followings are recommended. ·Establishment of the good maintenance program and continuous improvement. ·Application of OLM on the safety related and non-safety related components by step-by-step approach. ·Improvement PRA technology for the accurate and reliable risk analysis. ·Continuous training and cultivation for the qualified maintenance personnel

  19. Technology Trend in the Maintenance of Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Yoon, Kyungsup; Lee, Unjang [CTO and CEO, Seoul (Korea, Republic of)

    2014-05-15

    In this paper, overall technology evolution is reviewed and the improvements in the plant safety, reliability and productivity are described. And the issue and some recommendation for better maintenance of Korean nuclear power plants are presented as the interim study results on the 'Management and Regulatory Policy for the Nuclear Power Plant Maintenance and Equipment Reliability' under the agreement with the Nuclear Safety and Security Commission. The future trend in the maintenance technologies is also covered. Maintenance is the essential element for the enhancement of plant safety, reliability and economics and also for public safety. Therefore the regulator's involvements and the utility's active participation is inevitable for the better maintenance. For the better sustainability of our nuclear power plants the followings are recommended. ·Establishment of the good maintenance program and continuous improvement. ·Application of OLM on the safety related and non-safety related components by step-by-step approach. ·Improvement PRA technology for the accurate and reliable risk analysis. ·Continuous training and cultivation for the qualified maintenance personnel.

  20. Risk-Informed Decisions Optimization in Inspection and Maintenance

    International Nuclear Information System (INIS)

    Robertas Alzbutas

    2002-01-01

    The Risk-Informed Approach (RIA) used to support decisions related to inspection and maintenance program is considered. The use of risk-informed methods can help focus the adequate in-service inspections and control on the more important locations of complex dynamic systems. The focus is set on the highest risk measured as conditional core damage frequency, which is produced by the frequencies of degradation and final failure at different locations combined with the conditional failure consequence probability. The probabilities of different degradation states per year and consequences are estimated quantitatively. The investigation of inspection and maintenance process is presented as the combination of deterministic and probabilistic analysis based on general risk-informed model, which includes the inspection and maintenance program features. Such RIA allows an optimization of inspection program while maintaining probabilistic and fundamental deterministic safety requirements. The failure statistics analysis is used as well as the evaluation of reliability of inspections. The assumptions regarding the effectiveness of the inspection methods are based on a classification of the accessibility of the welds during the inspection and on the different techniques used for inspection. The probability of defect detection is assumed to depend on the parameters either through logarithmic or logit transformation. As example the modeling of the pipe systems inspection process is analyzed. The means to reduce a number of inspection sites and the cumulative radiation exposure to the NPP inspection personnel with a reduction of overall risk is presented together with used and developed software. The developed software can perform and administrate all the risk evaluations and ensure the possibilities to compare different options and perform sensitivity analysis. The approaches to define an acceptable level of risk are discussed. These approaches with appropriate software in

  1. Water Distribution System Operation and Maintenance. A Field Study Training Program. Second Edition.

    Science.gov (United States)

    Kerri, Kenneth D.; And Others

    Proper installation, inspection, operation, maintenance, repair and management of water distribution systems have a significant impact on the operation and maintenance cost and effectiveness of the systems. The objective of this manual is to provide water distribution system operators with the knowledge and skills required to operate and maintain…

  2. Integrated Technical Information for the Air Logistics Center: Enhancing Maintenance Technician Task Performance

    National Research Council Canada - National Science Library

    Mitta, Deborah

    1998-01-01

    This technical paper documents the final results of an analysis of the task environment under which depot maintenance technicians perform their jobs--specifically, programmed depot maintenance (PDM) for F-15 aircraft...

  3. Optimizing Maintenance Planning in the Production Industry Using the Markovian Approach

    Directory of Open Access Journals (Sweden)

    B Kareem

    2012-12-01

    Full Text Available Maintenance is an essential activity in every manufacturing establishment, as manufacturing effectiveness counts on the functionality of production equipment and machinery in terms of their productivity and operational life. Maintenance cost minimization can be achieved by adopting an appropriate maintenance planning policy. This paper applies the Markovian approach to maintenance planning decision, thereby generating optimal maintenance policy from the identified alternatives over a specified period of time. Markov chains, transition matrices, decision processes, and dynamic programming models were formulated for the decision problem related to maintenance operations of a cable production company. Preventive and corrective maintenance data based on workloads and costs, were collected from the company and utilized in this study. The result showed variability in the choice of optimal maintenance policy that was adopted in the case study. Post optimality analysis of the process buttressed the claim. The proposed approach is promising for solving the maintenance scheduling decision problems of the company.

  4. Software Tools for Software Maintenance

    Science.gov (United States)

    1988-10-01

    COMMUNICATIONS, AND COMPUTER SCIENCES I ,(AIRMICS) FO~SOFTWARE TOOLS (.o FOR SOF1 ’ARE MAINTENANCE (ASQBG-1-89-001) October, 1988 DTIC ELECTE -ifB...SUNWW~. B..c Program An~Iysw HA.c C-Tractr C Cobol Stncturing Facility VS Cobol 11 F-Scan Foctma Futbol Cobol Fortran Sltiuc Code Anaiyaer Fortran IS

  5. Maintenance concept development for the Compact Ignition Tokamak

    International Nuclear Information System (INIS)

    Macdonald, D.

    1988-01-01

    The Compact Ignition Tokamak (CIT), located at the Princeton Plasma Physics Laboratory, will be the next major experimental machine in the US Fusion Program. Its use of deuterium-tritium (D-T) fuel requires the use of remote handling technology to carry out maintenance operations on the machine. These operations consist of removing and repairing such components as diagnostic equipment modules by using remotely operated maintenance equipment. The major equipment being developed for maintenance external to the vacuum vessel includes both bridge-mounted and floor-mounted manipulator systems. Additionally, decontamination (decon) equipment, hot cell repair facilities, and equipment for handling and packaging solid radioactive waste (rad-waste) are being developed. Recent design activities have focused on establishing maintenance system interfaces with the facility design, developing manipulator system requirements, and using mock-ups to support the tokamak configuration design. 3 refs., 8 figs

  6. Comprehensive low-cost reliability centered maintenance. Final report

    International Nuclear Information System (INIS)

    Rotton, S.J.; Dozier, I.J.; Thow, R.

    1995-09-01

    Reliability Centered Maintenance (RCM) is a maintenance optimization approach that all electric utilities can apply to power plant systems. The Electric Power Research Institute and PECO Energy Company jointly sponsored this Comprehensive Low-Cost Reliability Centered Maintenance project to demonstrate that the standard RCM methodology could be streamlined to reduce the cost of analysis while maintaining a high quality product. EPRI's previous investigation of streamlined RCM methods being pioneered in the nuclear industry indicated that PECO Energy could expect to optimize its maintenance program at reduced cost by carefully controlling the scope without sacrificing documentation or technical quality. Using the insights obtained from these previous studies, three methods were defined in this project and were demonstrated in a large scale application to 60 systems at both the Limerick Generating Station and the Peach Bottom Atomic Power Station

  7. Maintenance features of the Compact Ignition Tokamak fusion reactor

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Hager, E.R.

    1987-01-01

    The Compact Ignition Tokamak (CIT) is envisaged to be the next experimental machine in the US Fusion Program. Its use of deuterium/tritium fuel requires the implementation of remote handling technology for maintenance and disassembly operations. The reactor is surrounded by a close-proximity nuclear shield which is designed to permit personnel access within the test cell, one day after shutdown. With the shield in place, certain maintenance activities in the cell may be done hands-on. Maintenance on the reactor is accomplished remotely using a boom-mounted manipulator after disassembling the shield. Maintenance within the plasma chamber is accomplished with two articulated boom manipulators that are capable of operating in a vacuum environment. They are stored in a vacuum enclosure behind movable shield plugs

  8. Moving toward Personalized Medicine in the Methadone Maintenance Treatment Program: A Pilot Study on the Evaluation of Treatment Responses in Taiwan

    Directory of Open Access Journals (Sweden)

    Hsin-Ya Lee

    2013-01-01

    Full Text Available This pilot study simultaneously evaluated the effects of various factors, including genetic variations of CYP2B6, CYP2C19, and ABCB1, demographic characteristics, disease states, methadone-drug interactions (MDIs, and poly-substance use, on the treatment responses among non-HIV patients in the methadone maintenance treatment program (MMTP in Taiwan. A total of 178 patients were recruited from two major hospitals that provided MMTP services in southern Taiwan, and information regarding concomitant medications and diseases was acquired from the National Health Insurance (NHI program. The results demonstrated that the methadone maintenance dose, CYP2B6 785G allele, and ABCB1 2677T allele have positive effects on the methadone plasma concentration. In contrast, patients with HCV coinfection, alcohol problems, and psychiatric diseases may have a negative response to treatment. Thus, a comprehensive evaluation of treatment responses in the MMTP should include not only genetic polymorphisms in methadone metabolism and transporter proteins, but also concomitant diseases, MDIs, and poly-substance use. The results also suggest that personalized medicine may be indispensable for a better outcome of the MMTP.

  9. Value maximizing maintenance policies under general repair

    International Nuclear Information System (INIS)

    Marais, Karen B.

    2013-01-01

    One class of maintenance optimization problems considers the notion of general repair maintenance policies where systems are repaired or replaced on failure. In each case the optimality is based on minimizing the total maintenance cost of the system. These cost-centric optimizations ignore the value dimension of maintenance and can lead to maintenance strategies that do not maximize system value. This paper applies these ideas to the general repair optimization problem using a semi-Markov decision process, discounted cash flow techniques, and dynamic programming to identify the value-optimal actions for any given time and system condition. The impact of several parameters on maintenance strategy, such as operating cost and revenue, system failure characteristics, repair and replacement costs, and the planning time horizon, is explored. This approach provides a quantitative basis on which to base maintenance strategy decisions that contribute to system value. These decisions are different from those suggested by traditional cost-based approaches. The results show (1) how the optimal action for a given time and condition changes as replacement and repair costs change, and identifies the point at which these costs become too high for profitable system operation; (2) that for shorter planning horizons it is better to repair, since there is no time to reap the benefits of increased operating profit and reliability; (3) how the value-optimal maintenance policy is affected by the system's failure characteristics, and hence whether it is worthwhile to invest in higher reliability; and (4) the impact of the repair level on the optimal maintenance policy. -- Highlights: •Provides a quantitative basis for maintenance strategy decisions that contribute to system value. •Shows how the optimal action for a given condition changes as replacement and repair costs change. •Shows how the optimal policy is affected by the system's failure characteristics. •Shows when it is

  10. Managing NASA's International Space Station Logistics and Maintenance Program

    Science.gov (United States)

    Butina, Anthony

    2001-01-01

    The International Space Station's Logistics and Maintenance program has had to develop new technologies and a management approach for both space and ground operations. The ISS will be a permanently manned orbiting vehicle that has no landing gear, no international borders, and no organizational lines - it is one Station that must be supported by one crew, 24 hours a day, 7 days a week, 365 days a year. It flies partially assembled for a number of years before it is finally completed in 2006. It has over 6,000 orbital replaceable units (ORU), and spare parts which number into the hundreds of thousands, from 127 major US vendors and 70 major international vendors. From conception to operation, the ISS requires a unique approach in all aspects of development and operations. Today the dream is coming true; hardware is flying and hardware is failing. The system has been put into place to support the Station for both space and ground operations. It started with the basic support concept developed for Department of Defense systems, and then it was tailored for the unique requirements of a manned space vehicle. Space logistics is a new concept that has wide reaching consequences for both space travel and life on Earth. This paper discusses what type of organization has been put into place to support both space and ground operations and discusses each element of that organization. In addition, some of the unique operations approaches this organization has had to develop is discussed.

  11. Routine maintenance prolongs ESP time between failures

    International Nuclear Information System (INIS)

    Hurst, T.; Lannom, R.W.; Divine, D.L.

    1992-01-01

    This paper reports that routine maintenance of electric submersible motors (ESPs) significantly lengthened the mean time between motor failures (MTBF), decreased operating costs, and extended motor run life in the Sacroc Unit of the Kelly-Snyder field in West Texas. After the oil price boom of the early 1980s. rapidly eroding profit margins from producing properties caused a much stronger focus on reducing operating costs. In Sacroc, ESP operating life and repair costs became a major target of cost reduction efforts. The routine ESP maintenance program has been in place for over 3 years

  12. Joint optimization of LORA and spares stocks considering corrective maintenance time

    Institute of Scientific and Technical Information of China (English)

    Linhan Guo; Jiujiu Fan; Meilin Wen; Rui Kang

    2015-01-01

    Level of repair analysis (LORA) is an important method of maintenance decision for establishing systems of operation and maintenance in the equipment development period. Currently, the research on equipment of repair level focuses on economic analy-sis models which are used to optimize costs and rarely considers the maintenance time required by the implementation of the main-tenance program. In fact, as to the system requiring high mission complete success, the maintenance time is an important factor which has a great influence on the availability of equipment sys-tems. Considering the relationship between the maintenance time and the spares stocks level, it is obvious that there are contra-dictions between the maintenance time and the cost. In order to balance these two factors, it is necessary to build an optimization LORA model. To this end, the maintenance time representing per-formance characteristic is introduced, and on the basis of spares stocks which is traditional y regarded as a decision variable, a de-cision variable of repair level is added, and a multi-echelon multi-indenture (MEMI) optimization LORA model is built which takes the best cost-effectiveness ratio as the criterion, the expected num-ber of backorder (EBO) as the objective function and the cost as the constraint. Besides, the paper designs a convex programming algorithm of multi-variable for the optimization model, provides solutions to the non-convex objective function and methods for improving the efficiency of the algorithm. The method provided in this paper is proved to be credible and effective according to the numerical example and the simulation result.

  13. 25 CFR 170.811 - What happens if lack of funds results in inadequate maintenance?

    Science.gov (United States)

    2010-04-01

    ... maintenance? 170.811 Section 170.811 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.811 What happens if lack of funds results in inadequate maintenance? If BIA determines that an IRR transportation facility is not being...

  14. Perspective of the Westinghouse steam generator secondary side maintenance approach

    Energy Technology Data Exchange (ETDEWEB)

    Ramaley, D. [Westinghouse Electric Company LLC, Cranberry Township, Pennsylvania (United States)

    2012-07-01

    Historically, Westinghouse had developed a set of steam generator secondary maintenance guidelines focused around performing recurring activities each outage without direct regards to the age, deposit loading, operational status, or corrosion status of the steam generator. Through the evolution of steam generator design and steam generator condition data, Westinghouse now uses a proactive assessment and planning approach for utilities. Westinghouse works with utilities to develop steam generator secondary maintenance plans for long term steam generator viability. Westinghouse has developed a portfolio of products to allow utilities to optimize steam generator operability and develop programs aimed at maintaining the steam generator secondary side in a favorable condition for successful long term operation. Judicious use of the means available for program development should allow for corrosion free operation, long term full power operation at optimum thermal efficiency, and leveling of outage expenditures over a long period of time. This paper will review the following required elements for an effective steam generator secondary side strategy: • Assessment: In order to develop an appropriate maintenance strategy, actions must be taken to obtain an accurate picture of the SG secondary side condition. • Forecasting: Using available data predictions are developed for future steam generator conditions and required maintenance actions. • Action: Cost effective engineering and maintenance actions must be completed at the appropriate time as designated by the plan. • Evaluation of Results: Following execution of maintenance tactics, it is necessary to revise strategy and develop technology enhancements as appropriate. (author)

  15. Fatty acid oxidation is required for active and quiescent brown adipose tissue maintenance and thermogenic programing

    Directory of Open Access Journals (Sweden)

    Elsie Gonzalez-Hurtado

    2018-01-01

    Full Text Available Objective: To determine the role of fatty acid oxidation on the cellular, molecular, and physiologic response of brown adipose tissue to disparate paradigms of chronic thermogenic stimulation. Methods: Mice with an adipose-specific loss of Carnitine Palmitoyltransferase 2 (Cpt2A−/−, that lack mitochondrial long chain fatty acid β-oxidation, were subjected to environmental and pharmacologic interventions known to promote thermogenic programming in adipose tissue. Results: Chronic administration of β3-adrenergic (CL-316243 or thyroid hormone (GC-1 agonists induced a loss of BAT morphology and UCP1 expression in Cpt2A−/− mice. Fatty acid oxidation was also required for the browning of white adipose tissue (WAT and the induction of UCP1 in WAT. In contrast, chronic cold (15 °C stimulation induced UCP1 and thermogenic programming in both control and Cpt2A−/− adipose tissue albeit to a lesser extent in Cpt2A−/− mice. However, thermoneutral housing also induced the loss of UCP1 and BAT morphology in Cpt2A−/− mice. Therefore, adipose fatty acid oxidation is required for both the acute agonist-induced activation of BAT and the maintenance of quiescent BAT. Consistent with this data, Cpt2A−/− BAT exhibited increased macrophage infiltration, inflammation and fibrosis irrespective of BAT activation. Finally, obese Cpt2A−/− mice housed at thermoneutrality exhibited a loss of interscapular BAT and were refractory to β3-adrenergic-induced energy expenditure and weight loss. Conclusion: Mitochondrial long chain fatty acid β-oxidation is critical for the maintenance of the brown adipocyte phenotype both during times of activation and quiescence. Keywords: Fatty acid oxidation, Brown adipose tissue, Cold induced thermogenesis, Adrenergic signaling, Adipose macrophage

  16. On-line maintenance at Cofrentes NPP

    International Nuclear Information System (INIS)

    Roldan Vilches, J.; Moreno Matarranz, M. A.; Hermana Mendioroz, I.

    1998-01-01

    Cofrentes NPP has begun in 1997 activities related to At Power Preventive Maintenance over trains or systems which lead to a voluntary entry in a Limitative Condition of Operation (LCO) of the Technical Specifications. From others benefits, this program ha improved the risk management and the staff's knowledge over the functions and safety implications of the different systems, the better exploit of the resources, the co-ordination of the different organisations involved (Maintenance an Operation) and the reductions of works during shutdowns. Previous to each work, a feasibility study analyzes qualitative and quantitative (PSA), using the Risk Monitor, the implications on safety of all the tasks, assuring that the global safety of the Plant is always maintained. Tech. Spec. are analyzed in detail and also are analyzed situations of simultaneous unavailabilities of systems which could lead to a high risk situation. Two different risk controls are defined (punctual and accumulated) to assure that high risk situations will not be given. Finally, historical risk profile is analyzed to assure that the accumulated risk increase is not significant. Risk Monitor helps staff in the schedule and follow-up of the activities of On-Line Maintenance. Each one of the tasks are deeply planned and harshly analyzed and are carried out by high qualified workers. By the moment, this program is running with fully satisfaction on the Plant. (Author)

  17. DOE handbook: Guide to good practices for training and qualification of maintenance personnel

    International Nuclear Information System (INIS)

    1996-03-01

    The purpose of this Handbook is to provide contractor training organizations with information that can be used to verify the adequacy of and/or modify existing maintenance training programs, or to develop new training programs. This guide, used in conjunction with facility-specific job analyses, provides a framework for training and qualification programs for maintenance personnel at DOE reactor and nonreactor nuclear facilities. Recommendations for qualification are made in four areas: education, experience, physical attributes, and training. The functional positions of maintenance mechanic, electrician, and instrumentation and control technician are covered by this guide. Sufficient common knowledge and skills were found to include the three disciplines in one guide to good practices. Contents include: qualifications; on-the-job training; trainee evaluation; continuing training; training effectiveness evaluation; and program records. Appendices are included which relate to: administrative training; industrial safety training; fundamentals training; tools and equipment training; facility systems and component knowledge training; facility systems and component skills training; and specialized skills training

  18. DOE handbook: Guide to good practices for training and qualification of maintenance personnel

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    The purpose of this Handbook is to provide contractor training organizations with information that can be used to verify the adequacy of and/or modify existing maintenance training programs, or to develop new training programs. This guide, used in conjunction with facility-specific job analyses, provides a framework for training and qualification programs for maintenance personnel at DOE reactor and nonreactor nuclear facilities. Recommendations for qualification are made in four areas: education, experience, physical attributes, and training. The functional positions of maintenance mechanic, electrician, and instrumentation and control technician are covered by this guide. Sufficient common knowledge and skills were found to include the three disciplines in one guide to good practices. Contents include: qualifications; on-the-job training; trainee evaluation; continuing training; training effectiveness evaluation; and program records. Appendices are included which relate to: administrative training; industrial safety training; fundamentals training; tools and equipment training; facility systems and component knowledge training; facility systems and component skills training; and specialized skills training.

  19. Study on how to evaluate the effectiveness of maintenance activities for giant complex plant system

    International Nuclear Information System (INIS)

    Aoki, Takayuki

    2010-01-01

    If we try to check the effectiveness of maintenance activities in nuclear power plant, it is necessary to evaluate plant performance from the viewpoint of nuclear safety and economy. So, in this paper, after the relation among maintenance optimization, maintenance performance targets, maintenance effectiveness indicator and maintenance key parameters important to nuclear safety and economy was made clear, a method to evaluate the effectiveness of maintenance activities was discussed. As a result of consideration, it was concluded that the maintenance effectiveness indicator proposed in this paper can evaluate maintenance effectiveness and can show the direction of improving existing maintenance program because the relation with maintenance performance target and maintenance key parameters is clear. (author)

  20. 25 CFR 170.805 - What are the local, tribal, and BIA roles in transportation facility maintenance?

    Science.gov (United States)

    2010-04-01

    ... transportation facility maintenance? 170.805 Section 170.805 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.805 What are the local... Road Maintenance dollars. ...

  1. Concentration of some heavy metals in rice types available in Shiraz market and human health risk assessment.

    Science.gov (United States)

    Naseri, Mahmood; Vazirzadeh, Arya; Kazemi, Robabeh; Zaheri, Farnaz

    2015-05-15

    This investigation was conducted to survey the levels of some heavy metals such as cadmium, lead, chromium, nickel and cobalt in domestic cultivated and imported rice sold on the Shiraz - Iran markets. The potential human health risk assessment was conducted by considering estimated weekly intake (EWI) of toxic metals from eating rice and compared calculated values with provisional tolerable weekly intake (PTWI). The mean values for lead and cadmium in domestic cultivated and imported rice were considerably higher than allowable limits set by FAO/WHO. In combination of recent rice consumption data, the estimated weekly intakes of toxic element were calculated for Iranian population. EWI for cadmium, nickel, chromium through imported and domestic cultivated rice consumption was lower than the PTWI. The EWI for lead were considerably higher than other measured toxic metals. The highest mean level of EWI for lead was observed in some imported rice samples (25.76 μg/kg body weight). Copyright © 2014 Elsevier Ltd. All rights reserved.

  2. Potential of Computerized Maintenance Management System in Facilities Management

    Directory of Open Access Journals (Sweden)

    Noor Farisya Azahar

    2014-07-01

    Full Text Available For some time it has been clear that managing buildings or estates has been carried out in the context of what has become known as facilities management. British Institute of Facilities Management defined facilities management is the integration of multi-disciplinary activities within the built environment and the management of their impact upon people and the workplace. Effective facilities management is vital to the success of an organisation by contributing to the delivery of its strategic and operational objectives. Maintenance of buildings should be given serious attention before (stage design, during and after a building is completed. But total involvement in building maintenance is after the building is completed and during its operations. Residents of and property owners require their building to look attractive, durable and have a peaceful indoor environment and efficient. The objective of the maintenance management system is to stream line the vast maintenance information system to improve the productivity of an industrial plant. a good maintenance management system makes equipment and facilities available. This paper will discuss the fundamental steps of maintenance management program and Computerized Maintenance Management System (CMMS

  3. Study on application of safety checklist in preventive maintenance activities

    International Nuclear Information System (INIS)

    Shi Jin; Chen Song; Liu Jingquan

    2013-01-01

    The paper describes the principles and the characteristics of safety checklist as a risk evaluation method. Examples of application of safety checklists to preventive maintenance activities such as criteria comparison and checkup items in place in nuclear power plants are illustrated in details with issues appeared in the checklist establishment. Checklist has a good application in the RCM analysis or in the actual preventive maintenance program for Chashma Nuclear Power Plant indicated by concrete instances. In the light of safety checklist which is used to sustain preventive maintenance as a simple and applicable risk analysis approach, we can get deep knowledge of risks of nuclear power plant to perfect preventive maintenance activities. (authors)

  4. Annual summary report of the Decontamination and Decommissioning Surveillance and Maintenance Program at Oak Ridge National Laboratory for period ending September 30, 1993

    International Nuclear Information System (INIS)

    1993-11-01

    The Oak Ridge National Laboratory (ORNL) Decontamination and Decommissioning (D ampersand D) Program has continued to provide surveillance and maintenance (S ampersand M) support for 34 surplus facilities. The objectives are to (1) ensure adequate containment of residual radioactive materials remaining in the facilities, (2) provide safety and security controls to minimize the potential hazards to on-site personnel and the general public, and (3) manage the facilities in the most cost-effective manner while awaiting decommissioning. This support has included work in three principal areas: (1) S ampersand M planning, (2) routine S ampersand M, and (3) special projects designed to correct serious facility deficiencies beyond the scope of routine maintenance

  5. Generalized Maintenance Trainer Simulator: Development of Hardware and Software. Final Report.

    Science.gov (United States)

    Towne, Douglas M.; Munro, Allen

    A general purpose maintenance trainer, which has the potential to simulate a wide variety of electronic equipments without hardware changes or new computer programs, has been developed and field tested by the Navy. Based on a previous laboratory model, the Generalized Maintenance Trainer Simulator (GMTS) is a relatively low cost trainer that…

  6. Comparison of a low carbohydrate and low fat diet for weight maintenance in overweight or obese adults enrolled in a clinical weight management program

    Directory of Open Access Journals (Sweden)

    Curry Chelsea

    2007-11-01

    Full Text Available Abstract Background Recent evidence suggests that a low carbohydrate (LC diet may be equally or more effective for short-term weight loss than a traditional low fat (LF diet; however, less is known about how they compare for weight maintenance. The purpose of this study was to compare body weight (BW for participants in a clinical weight management program, consuming a LC or LF weight maintenance diet for 6 months following weight loss. Methods Fifty-five (29 low carbohydrate diet; 26 low fat diet overweight/obese middle-aged adults completed a 9 month weight management program that included instruction for behavior, physical activity (PA, and nutrition. For 3 months all participants consumed an identical liquid diet (2177 kJ/day followed by 1 month of re-feeding with solid foods either low in carbohydrate or low in fat. For the remaining 5 months, participants were prescribed a meal plan low in dietary carbohydrate (~20% or fat (~30%. BW and carbohydrate or fat grams were collected at each group meeting. Energy and macronutrient intake were assessed at baseline, 3, 6, and 9 months. Results The LC group increased BW from 89.2 ± 14.4 kg at 3 months to 89.3 ± 16.1 kg at 9 months (P = 0.84. The LF group decreased BW from 86.3 ± 12.0 kg at 3 months to 86.0 ± 14.0 kg at 9 months (P = 0.96. BW was not different between groups during weight maintenance (P = 0.87. Fifty-five percent (16/29 and 50% (13/26 of participants for the LC and LF groups, respectively, continued to decrease their body weight during weight maintenance. Conclusion Following a 3 month liquid diet, the LC and LF diet groups were equally effective for BW maintenance over 6 months; however, there was significant variation in weight change within each group.

  7. Preventive maintenance basis: Volume 24 -- Battery -- flooded lead-acid (lead-calcium, lead antimony, plante). Final report

    International Nuclear Information System (INIS)

    Worledge, D.; Hinchcliffe, G.

    1997-12-01

    US nuclear power plants are implementing preventive maintenance (PM) tasks with little documented basis beyond fundamental vendor information to support the tasks or their intervals. The Preventive Maintenance Basis project provides utilities with the technical basis for PM tasks and task intervals associated with 40 specific components such as valves, electric motors, pumps, and HVAC equipment. This document provides a program of preventive maintenance tasks suitable for application to flooded lead-acid batteries. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used in conjunction with material from other sources, to develop a complete PM program or to improve an existing program. This document provides a program of preventive maintenance (PM) tasks suitable for application to flooded lead-acid batteries. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used, in conjunction with material from other sources, to develop a complete PM program or to improve an existing program. Users of this information will be utility managers, supervisors, system engineers, craft technicians, and training instructors responsible for developing, optimizing, or fine-tuning PM programs

  8. A genetic algorithm solution for a nuclear power plant risk-cost maintenance model

    International Nuclear Information System (INIS)

    Tong Jiejuan; Mao Dingyuan; Xue Dazhi

    2004-01-01

    Reliability Centered Maintenance (RCM) is one of the popular maintenance optimization methods according to certain kinds of priorities. Traditional RCM usually analyzes and optimizes the maintenance strategy from the viewpoint of component instead of the whole maintenance program impact. Research presented in this paper is a pilot study using PSA techniques in RCM. How to reflect the effect on component unavailability by the maintenance activities such as surveillance testing and preventive maintenance in PSA model is discussed firstly. Based on the discussion, a maintenance risk-cost model is established for global maintenance optimization in a nuclear power plant, and a genetic algorithm (GA) is applied to solve such a model to get the global optimized maintenance strategy. Finally, the result got from a simple test case based on a risk-cost model consisting of 10 components is presented

  9. Road maintenance optimization through a discrete-time semi-Markov decision process

    International Nuclear Information System (INIS)

    Zhang Xueqing; Gao Hui

    2012-01-01

    Optimization models are necessary for efficient and cost-effective maintenance of a road network. In this regard, road deterioration is commonly modeled as a discrete-time Markov process such that an optimal maintenance policy can be obtained based on the Markov decision process, or as a renewal process such that an optimal maintenance policy can be obtained based on the renewal theory. However, the discrete-time Markov process cannot capture the real time at which the state transits while the renewal process considers only one state and one maintenance action. In this paper, road deterioration is modeled as a semi-Markov process in which the state transition has the Markov property and the holding time in each state is assumed to follow a discrete Weibull distribution. Based on this semi-Markov process, linear programming models are formulated for both infinite and finite planning horizons in order to derive optimal maintenance policies to minimize the life-cycle cost of a road network. A hypothetical road network is used to illustrate the application of the proposed optimization models. The results indicate that these linear programming models are practical for the maintenance of a road network having a large number of road segments and that they are convenient to incorporate various constraints on the decision process, for example, performance requirements and available budgets. Although the optimal maintenance policies obtained for the road network are randomized stationary policies, the extent of this randomness in decision making is limited. The maintenance actions are deterministic for most states and the randomness in selecting actions occurs only for a few states.

  10. Maintenance implementation plan for the B Plant/WESF. Revision 4

    International Nuclear Information System (INIS)

    Tritt, S.E.; Lueck, B.H.

    1996-01-01

    This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the B Plant/WESF (Waste Encapsulation Storage Facility) complex. The objective of this plan is to provide baseline information for establishing and identifying WHC conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at B Plant/WESF. The B Plant WESF facility complex consists of three main facilities and several support structures located in the 200 East Area of the Hanford site. B Plant is a transition facility that is required to ensure safe storage and management of WESF (operating facility) cesium and strontium capsules. B Plant/WESF also contains substantial radiological inventory from previous campaigns. There are no production activities at B Plant, but several of its operating systems are required to accomplish the current B Plant/WESF mission. B Plant/WESF are each considered a nuclear facility due to the storage of cesium and strontium capsules at WESF and the large radiological inventory from past processing

  11. Inspection, evaluation and maintenance guidelines for reactor vessel internals in JAPAN

    International Nuclear Information System (INIS)

    Sakashita, Akihiro; Goto, Tomoya; Hirano, Shinro; Dozaki, Koji

    2010-01-01

    Inspection and Evaluation Guidelines for reactor internals has been taken into the Rules on Fitness-for–Service for Nuclear Power Plants of The Japan Society of Mechanical Engineers. It is a base of the maintenance plan of each Nuclear Power Plant. A plant maintenance methodology will have more importance to maintain the plant safety and stable plant operation. This paper introduces the systematization of the maintenance such as repair, replacement, preventive maintenance in these guidelines. Maintenance methodologies are classified follows. Repair: methodology to reinforce degraded parts by some methods or prevent progress of degradation of without replacement of the existing structure when the degradation of structure is actualized. Replacement: methodology to replace the existing structure with new one when the degradation of structure is actualized. Preventive maintenance : methodology to mitigate the damaged condition. When the maintenance methodologies are implemented in the actual plant, we have to consider the feedback of the inspection program and plant life management. (author)

  12. Stakeholders responses on health maintenance organizations ...

    African Journals Online (AJOL)

    National Health Insurance Scheme uses the services of Health Maintenance Organizations to run the scheme. This model of administering a national health insurance scheme is different from how so many other national health insurance programs are run in other parts of the world. The designing of the NHIS to include the ...

  13. TECHNICAL MAINTENANCE EFFICIENCY OF THE AIRCRAFT MAINTENANCE-FREE ON-BOARD SYSTEM BETWEEN SCHEDULED MAINTENANCES

    Directory of Open Access Journals (Sweden)

    A. M. Bronnikov

    2017-01-01

    Full Text Available The avionics concept of the maintenance-free on-board equipment implies the absence of necessity to maintain onboard systems between scheduled maintenance, preserving the required operational and technical characteristics; it should be achieved by automatic diagnosis of the technical condition and the application of active means of ensuring a failsafe design, allowing to change the structure of the system to maintain its functions in case of failure. It is supposed that such equipment will reduce substantially and in the limit eliminate traditional maintenance of aircraft between scheduled maintenance, ensuring maximum readiness for use, along with improving safety. The paper proposes a methodology for evaluating the efficiency of maintenance-free between scheduled maintenance aircraft system with homogeneous redundancy. The excessive redundant elements allow the system to accumulate failures which are repaired during the routine maintenance. If the number of failures of any reserve is approaching a critical value, the recovery of the on-board system (elimination of all failures is carried out between scheduled maintenance by conducting rescue and recovery operations. It is believed that service work leads to the elimination of all failures and completely updates the on-board system. The process of system operational status changes is described with the discrete-continuous model in the flight time. The average losses in the sorties and the average cost of operation are used as integrated efficiency indicators of system operation. For example, the evaluation of the operation efficiency of formalized on-board system with homogeneous redundancy demonstrates the efficiency of the proposed methodology and the possibility of its use while analyzing the efficiency of the maintenance-free operation equipment between scheduled periods. As well as a comparative analysis of maintenance-free operation efficiency of the on-board system with excessive

  14. Maintenance proficiency evaluation test bank

    International Nuclear Information System (INIS)

    Maier, Loran

    2003-01-01

    identify retraining and initial training needs as part of their accredited training programs. Identification of the present knowledge and skills of a potential new hire or transferee has proven to be very cost effective for some utilities. Utilities participating in the MPETB project have experienced substantial O and M cost savings through the application of MPE methodology and access to the test item data bank. One utility used MPEs for rigging during one of their outages and realized a cost savings of $227,500. Others have experienced similar savings on other maintenance tasks. (author)

  15. Nuclear power plant maintenance optimisation SENUF network activity

    International Nuclear Information System (INIS)

    Ahlstrand, R.; Bieth, M.; Pla, P.; Rieg, C.; Trampus, P.

    2004-01-01

    During providing scientific and technical support to TACIS and PHARE nuclear safety programs a large amount of knowledge related to Russian design reactor systems has accumulated and led to creation of a new Network concerning Nuclear Safety in Central and Eastern Europe called ''Safety of Eastern European type Nuclear Facilities'' (SENUF). SENUF contributes to bring together all stakeholders of TACIS and PHARE: beneficiaries, end users, Eastern und Western nuclear industries, and thus, to favour fruitful technical exchanges and feedback of experience. At present the main focus of SENUF is the nuclear power plant maintenance as substantial element of plant operational safety as well as life management. A Working Group has been established on plant maintenance. One of its major tasks in 2004 is to prepare a status report on advanced strategies to optimise maintenance. Optimisation projects have an interface with the plant's overall life management program. Today, almost all plants involved in SENUF network have an explicit policy to extend their service life, thus, component ageing management, modernization and refurbishment actions became much more important. A database is also under development, which intends to help sharing the available knowledge and specific equipment and tools. (orig.)

  16. Maintenance approaches and practices in selected foreign nuclear power programs and other US industries: Review and lessons learned

    Energy Technology Data Exchange (ETDEWEB)

    1990-04-01

    The Commission published a Notice of Proposed Rule-making on Maintenance of Nuclear Power Plants on November 28, 1988, spelling out NRC's expectations in maintenance. In preparing the proposed rule, the NRC reviewed maintenance practices in other countries and considered maintenance approaches in other industries in this country. As a result of the review of maintenance practices, it was concluded that certain practices in the following areas have been found to contribute significantly to effective maintenance: (1) systems approach; (2) effectiveness monitoring; (3) technician qualifications and motivation; and (4) maintenance organization. 87 refs., 26 figs., 2 tabs.

  17. Maintenance approaches and practices in selected foreign nuclear power programs and other US industries: Review and lessons learned

    International Nuclear Information System (INIS)

    1990-04-01

    The Commission published a Notice of Proposed Rule-making on Maintenance of Nuclear Power Plants on November 28, 1988, spelling out NRC's expectations in maintenance. In preparing the proposed rule, the NRC reviewed maintenance practices in other countries and considered maintenance approaches in other industries in this country. As a result of the review of maintenance practices, it was concluded that certain practices in the following areas have been found to contribute significantly to effective maintenance: (1) systems approach; (2) effectiveness monitoring; (3) technician qualifications and motivation; and (4) maintenance organization. 87 refs., 26 figs., 2 tabs

  18. Practical considerations in developing an instrument-maintenance plan--

    International Nuclear Information System (INIS)

    Guth, M.A.S.

    1989-01-01

    The author develops a general set of considerations to explain how a consistent, well-organized, prioritized, and adequate time-allowance program plan for routine maintenance can be constructed. The analysis is supplemented with experience from the high flux isotope reactor (HFIR) at US Oak Ridge National Laboratory (ORNL). After the preventive maintenance (PM) problem was defined, the instruments on the schedule were selected based on the manufacturer's design specifications, quality-assurance requirements, prior classifications, experiences with the incidence of breakdowns or calibration, and dependencies among instruments. The effects of repair error in PM should be also studied. The HFIR requires three full-time technicians to perform both PM and unscheduled maintenance. A review is presented of concepts from queuing theory to determine anticipated breakdown patterns. In practice, the pneumatic instruments have a much longer lifetime than the electric/electronic instruments on various reactors at ORNL. Some special considerations and risk aversion in choosing a maintenance schedule

  19. AUTOMOTIVE DIESEL MAINTENANCE 1. UNIT XXX, I--CATERPILLAR DIESEL ENGINE MAINTENANCE SUMMARY, II--REIEWING FACTS ABOUT ALTERNATORS.

    Science.gov (United States)

    Minnesota State Dept. of Education, St. Paul. Div. of Vocational and Technical Education.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO PROVIDE A SUMMARY OF DIESEL ENGINE MAINTENANCE FACTORS AND A REVIEW OF DIESEL ENGINE ALTERNATOR OPERATION. THE SEVEN SECTIONS COVER DIESEL ENGINE TROUBLESHOOTING AND THE OPERATION, TESTING, AND ADJUSTING OF ALTERNATORS. THE MODULE CONSISTS OF A SELF-INSTRUCTIONAL BRANCH PROGRAMED TRAINING FILM…

  20. Managing aging in nuclear power plants: Insights from NRC's maintenance team inspection reports

    International Nuclear Information System (INIS)

    Fresco, A.; Subudhi, M.

    1994-01-01

    Age-related degradation is managed through the maintenance program of a nuclear plant. From 1988 to 1991, the Nuclear Regulatory Commission (NRC) evaluated the maintenance program of every nuclear power plant in the United States. The authors reviewed 44 out of a total of 67 of the reports issued by the NRC on these in-depth team inspections. The reports were reviewed for insights into the strengths and weaknesses of the programs as related to the need to understand and manage the effects of aging on nuclear plant structures, systems, and components. The authors' conclusions are presented. 6 refs

  1. Ageing model considering effects of maintenance and working conditions

    International Nuclear Information System (INIS)

    Martorell, S.; Sanchez, A.; Serradell, V.

    1998-01-01

    Nowadays, there is some doubt about building new Nuclear Power Plants (NPPs). Instead, there is a growing interest in analyzing the possibility to extend current NPP operation where life management programs play an important role. The evolution of the NPP safety depends on the evolution of the reliability of its safety components as a function of their age along the NPP operational life. In this paper, a new age-dependent reliability model is presented, which includes parameters related to surveillance and maintenance effectiveness and working conditions, both environmental and operational, of the equipment. This model may be used to support NPP life management and life extension programs by improving or optimizing surveillance and maintenance tasks using risk and cost models based on such an age-dependent reliability model. The results of the sensitivity study in the application show that the selection of the most appropriate maintenance strategy would directly depend on the previous parameters and very important differences are expected to appear under certain circumstance. (Author) 7 refs

  2. Flight Crew Health Maintenance

    Science.gov (United States)

    Gullett, C. C.

    1970-01-01

    The health maintenance program for commercial flight crew personnel includes diet, weight control, and exercise to prevent heart disease development and disability grounding. The very high correlation between hypertension and overweight in cardiovascular diseases significantly influences the prognosis for a coronary prone individual and results in a high rejection rate of active military pilots applying for civilian jobs. In addition to physical fitness the major items stressed in pilot selection are: emotional maturity, glucose tolerance, and family health history.

  3. Maintenance methods

    International Nuclear Information System (INIS)

    Sanchis, H.; Aucher, P.

    1990-01-01

    The maintenance method applied at the Hague is summarized. The method was developed in order to solve problems relating to: the different specialist fields, the need for homogeneity in the maintenance work, the equipment diversity, the increase of the materials used at the Hague's new facilities. The aim of the method is to create a knowhow formalism, to facilitate maintenance, to ensure the running of the operations and to improve the estimation of the maintenance cost. One of the method's difficulties is the demonstration of the profitability of the maintenance operations [fr

  4. APPLICATION OF ROUGH SET THEORY TO MAINTENANCE LEVEL DECISION-MAKING FOR AERO-ENGINE MODULES BASED ON INCREMENTAL KNOWLEDGE LEARNING

    Institute of Scientific and Technical Information of China (English)

    陆晓华; 左洪福; 蔡景

    2013-01-01

    The maintenance of an aero-engine usually includes three levels ,and the maintenance cost and period greatly differ depending on the different maintenance levels .To plan a reasonable maintenance budget program , airlines would like to predict the maintenance level of aero-engine before repairing in terms of performance parame-ters ,which can provide more economic benefits .The maintenance level decision rules are mined using the histori-cal maintenance data of a civil aero-engine based on the rough set theory ,and a variety of possible models of upda-ting rules produced by newly increased maintenance cases added to the historical maintenance case database are in-vestigated by the means of incremental machine learning .The continuously updated rules can provide reasonable guidance suggestions for engineers and decision support for planning a maintenance budget program before repai-ring .The results of an example show that the decision rules become more typical and robust ,and they are more accurate to predict the maintenance level of an aero-engine module as the maintenance data increase ,which illus-trates the feasibility of the represented method .

  5. Building Maintenance. Performance Objectives. Basic Course.

    Science.gov (United States)

    Taylor, Ernest

    Several intermediate performance objectives and corresponding criterion measures are listed for each of the 13 terminal objectives for a basic high school building maintenance course (the first year of a 3-year program). The materials were developed for a 36-week course (2 hours daily) designed to enable 10th grade students to develop competencies…

  6. Building Maintenance. Reading and Language Activities.

    Science.gov (United States)

    Kessman, William A.

    The student manual has been designed primarily for beginning students in a high school level vocational program in building maintenance. A workbook for special needs students, the document does not cover all areas of custodial training but has been written for the purpose of refining the basic skills of reading comprehension, vocabulary building,…

  7. Interval of Routine Maintenance and Maintenance Performance: A Literature Review

    Directory of Open Access Journals (Sweden)

    Au-Yong Cheong Peng

    2016-01-01

    Full Text Available In high-rise residential buildings, the quality of facilities management services is significant to the normal operation of the facilities. Unfortunately, lack of concern towards building maintenance, especially preventive maintenance, happens in domestic housing industry in Malaysia. Majority of the maintenance operations of condominiums suffer from lack of planning, lack of proactive maintenance plan, and lack of proper implementation. Thus, this paper reviews the implementation of preventive maintenance strategy, routine maintenance in specific. An extensive review of literature published in 1987 to 2014 is performed for the purpose of this research. The publications are sourced from journal articles, conference proceedings and books. The literature analysis confirms that the routine maintenance of facilities and building services is vital and it can be influential towards the maintenance performance. Subsequently, a theoretical framework is developed, which shows the relationship between routine maintenance of building facilities & services and maintenance performance. The building facilities & services are divided into two categories. They are essential facilities & services that ensure the safety, health, habitability, and operability of buildings; while value-added facilities & services deal with property value, return on investment, and quality living of buildings. Based on the findings, a future research is proposed, which aims to identify the appropriate routine of maintenance for the facilities and services in high-rise residential buildings to improve the maintenance performance.

  8. Waste minimization, recycling and reuse in operations support services fleet maintenance

    International Nuclear Information System (INIS)

    Trego, A.L.

    1994-01-01

    Government regulations and smart business practices demand that organizations dramatically reduce both the type and volume of waste generated by their operations. This article describes successful waste minimization and recycling programs created by the Fleet Maintenance, Operations Support Services Division, Westinghouse Hanford Company. These comprehensive programs have greatly reduced waste formerly produced in maintaining 3,528 government-owned vehicles and nearly 200 emergency power generators at the Hanford Site. The actions are integral to preventing future contamination of the Site as well as to cleaning up the complexity of wastes from almost 50 years of defense production. The results of the Fleet Maintenance programs are impressive, recording cost savings of $290,000 in fiscal year 1993 and $965,000 since 1988

  9. Study of nuclear computer code maintenance and management system

    International Nuclear Information System (INIS)

    Ryu, Chang Mo; Kim, Yeon Seung; Eom, Heung Seop; Lee, Jong Bok; Kim, Ho Joon; Choi, Young Gil; Kim, Ko Ryeo

    1989-01-01

    Software maintenance is one of the most important problems since late 1970's.We wish to develop a nuclear computer code system to maintenance and manage KAERI's nuclear software. As a part of this system, we have developed three code management programs for use on CYBER and PC systems. They are used in systematic management of computer code in KAERI. The first program is embodied on the CYBER system to rapidly provide information on nuclear codes to the users. The second and the third programs were embodied on the PC system for the code manager and for the management of data in korean language, respectively. In the requirement analysis, we defined each code, magnetic tape, manual and abstract information data. In the conceptual design, we designed retrieval, update, and output functions. In the implementation design, we described the technical considerations of database programs, utilities, and directions for the use of databases. As a result of this research, we compiled the status of nuclear computer codes which belonged KAERI until September, 1988. Thus, by using these three database programs, we could provide the nuclear computer code information to the users more rapidly. (Author)

  10. Preventive maintenance basis: Volume 1 -- Air-operated valves. Final report

    International Nuclear Information System (INIS)

    Worledge, D.; Hinchcliffe, G.

    1997-07-01

    US nuclear plants are implementing preventive maintenance (PM) tasks with little documented basis beyond fundamental vendor information to support the tasks or their intervals. The Preventive Maintenance Basis project provides utilities with the technical basis for PM tasks and task intervals associated with 40 specific components such as valves, electric motors, pumps, and HVAC equipment. This report provides an overview of the PM Basis project and describes use of the PM Basis database. This document provides a program of PM tasks suitable for application to Air Operated Valves (AOV's) in nuclear power plants. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used, in conjunction with material from other sources, to develop a complete PM program or to improve an existing program. Users of this information will be utility managers, supervisors, craft technicians, and training instructors responsible for developing, optimizing, or fine-tuning PM programs

  11. AUTOMOTIVE DIESEL MAINTENANCE, UNIT V, MAINTAINING THE LUBRICATION SYSTEM--DETROIT DIESEL ENGINE.

    Science.gov (United States)

    Human Engineering Inst., Cleveland, OH.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE OPERATION AND MAINTENANCE OF THE DIESEL ENGINE LUBRICATION SYSTEM. TOPICS ARE LUBE OILS USED, MAINTENANCE OF THE LUBRICATION SYSTEM, AND CRANKCASE VENTILATION COMPONENTS. THE MODULE CONSISTS OF A SELF-INSTRUCTIONAL BRANCH PROGRAMED TRAINING FILM "BASIC ENGINE…

  12. Development of design system of manipulator for fusion reactor maintenance

    International Nuclear Information System (INIS)

    Ida, Toshio; Niikura, Setsuo; Ishiguro, Akiko; Yamada, Masao; Matsuoka, Fushiki

    1989-01-01

    A program which supports designers of a manipulator for in-vessel maintenance of a fusion reactor has been developed. The main purpose of this program is to provide the designer with a promising manipulator specification by furnishing useful information. It combines a technique of knowledge engineering with numerical solutions. This program consists of three parts: The first part is to generate candidates for the manipulator using a knowledge base; the second is to evaluate both static and dynamic properties of each candidate through numerical simulation of the maintenance task; and the third is to select the candidates having better performance and feasibility on the basis of the simulation data and knowledge base. The feasibility of the method used in this program is confirmed by the preliminary application. This application also emphasizes the importance of the knowledge base for the candidate generation and selection. Although the degree of freedom of the manipulator is restricted to less than 7 degrees in this study, further development of the capability of manipulator simulation (seven or more degrees of freedom) will enhance the effectiveness of this program. (orig.)

  13. Buprenorphine/Naloxone Maintenance Therapy: an Observational Retrospective Report on the Effect of Dose on 18 months Retention in an Office-Based Treatment Program

    Directory of Open Access Journals (Sweden)

    Theodore V Parran

    2017-10-01

    Full Text Available Context and objective: Buprenorphine has been available with few reports of the dose range necessary to adequately maintain patients. We report on the effect of 8 mg/d versus 16 mg/d of buprenorphine on long-term patient retention in office-based opioid maintenance (OBOMT. Design, setting, and participants: Case series, at an urban hospital-based primary care clinic providing OBOMT to 157 opiate-dependent, low socioeconomic status, uninsured, nonhomeless patients. Intervention: The OBOMT program operated by a comprehensive sobriety treatment program experienced State funding cuts. Thus, after 2 years, the program was required by the State funder to decrease the buprenorphine maintenance dose from 16 to 8 mg/d for all new admissions. We report on patient retention before and after dose reduction. Main outcome measures: The primary outcomes of this study were to measure and compare patient retention in the 2 cohorts at each point of treatment transition over the 18 months following OBOMT initiation. Results: No significant differences in patient retention were observed between the 16 and 8 mg/d patient cohorts. Lower dose buprenorphine maintenance (8 mg/d in uninsured patients enrolled in publicly funded long-term OBOMT combined with comprehensive sobriety counseling was as effective as higher dose therapy (16 mg/d in promoting patient retention throughout the study period. This lower dose resulted in a substantial saving to the public funding agency. Conclusions: In an observational retrospective report, retention in treatment of opiate-addicted patients was the same at 8 and 16 mg/d buprenorphine doses after 18 months. These data have implications for public and managed care funding of OBOMT, for the general prescribing of buprenorphine in outpatient care, and may be instructive in the ongoing debate about the relationship between buprenorphine dose.

  14. Underwater inspection and maintenance programs within nuclear and non-nuclear related operating systems

    International Nuclear Information System (INIS)

    Vallance, C.; Goulet, B.; Black, S.

    2008-01-01

    The increasing age of the nuclear and non-nuclear power generating facilities requires extended inspection, repair and maintenance (IRM) activities to prolong the operation of these facilities past their original design life. Commercial divers are often utilized to perform critical work at nuclear power plants, fuel reprocessing plants, waste storage facilities, and research institutions. These various tasks include inspection, welding, mechanical modifications and repairs, coating applications, and work associated with plant decommissioning. Programs may take place in areas such as the reactor vessel, equipment pool, spent fuel pool, and suppression chamber using manned intervention and remotely operated vehicles. Some of these tasks can also be conducted using remotely operated vehicles (ROV's). Although specialist robots are not uncommon to the nuclear industry, the use of free-swimming vehicle's and remote systems for the inspection of underwater assets has increased due to improvements of the supporting technologies and information requirements needed to extend the life of these facilities. This paper will provide an overview of the procedures and equipment necessary to perform unique work tasks using manned and unmanned techniques. (author)

  15. Regulatory approach of the monitoring the effectiveness of maintenance at nuclear power plants program; Abordagem regulatoria do programa de monitoracao da eficacia da manutencao para usinas nucleoeletricas

    Energy Technology Data Exchange (ETDEWEB)

    Vajgel, Stefan

    2009-03-15

    The electrical power generation using nuclear power plants requires this installation being safety, reliable and available for the working periods. For this purpose, an adequate, effective and well conducted maintenance program makes an essential and useful tool to the owner of the plant. However, it is necessary to follow the regulatory requirements for this program implementation which monitories this maintenance effectiveness. There are Brazilian norms requirements which must be followed. The international regulatory guides establish these requirements in good details but it is necessary to verify if this methodology for implementing can be totally applied here in Brazil. Then, the american guide NUMARC 93-01 which details how can be implemented a program for this monitoring, shows some methods for using. In this thesis, the Delphi and Probabilistic Safety Analysis were briefly included because they were preferred for implementing this monitoring.in a Brazilian plant. The results which are being obtained show that, looking the regulatory aspects, the NUMARC 93-01 follows our regulations and gives good results for the plant management. (author)

  16. Reliability Centered Maintenance as a tool for plant life extension

    International Nuclear Information System (INIS)

    Elliott, J.O.; Mulay, J.N.; Nakahara, Y.

    1991-01-01

    Currently in the nuclear industry there is a growing interest in lowering the cost and complexity of maintenance activities while at the same time improving plant reliability and safety in an effort to prepare for the technical and regulatory challenges of life extension. This seemingly difficult task is being aided by the introduction of a maintenance philosophy developed originally by the airline industry and subsequently applied with great success both in that industry and the U.S. military services. Reliability Centered Maintenance (RCM), in its basic form, may be described as a consideration of reliability and maintenance problems from a systems level approach, allowing a focus on preservation of system function as the aim of a maintenance program optimized for both safety and economics. It is this systematic view of plant maintenance, with the emphasis on overall functions rather than individual parts and components which sets RCM apart from past nuclear plant maintenance philosophies. It is also the factor which makes application of RCM an ideal first step in development of strategies for life extension, both for aging plants, and for plants just beginning their first license term. (J.P.N.)

  17. Integrated reliability condition monitoring and maintenance of equipment

    CERN Document Server

    Osarenren, John

    2015-01-01

    Consider a Viable and Cost-Effective Platform for the Industries of the Future (IOF) Benefit from improved safety, performance, and product deliveries to your customers. Achieve a higher rate of equipment availability, performance, product quality, and reliability. Integrated Reliability: Condition Monitoring and Maintenance of Equipment incorporates reliable engineering and mathematical modeling to help you move toward sustainable development in reliability condition monitoring and maintenance. This text introduces a cost-effective integrated reliability growth monitor, integrated reliability degradation monitor, technological inheritance coefficient sensors, and a maintenance tool that supplies real-time information for predicting and preventing potential failures of manufacturing processes and equipment. The author highlights five key elements that are essential to any improvement program: improving overall equipment and part effectiveness, quality, and reliability; improving process performance with maint...

  18. An effective approach to reducing strategy space for maintenance optimisation of multistate series–parallel systems

    International Nuclear Information System (INIS)

    Zhou, Yifan; Lin, Tian Ran; Sun, Yong; Bian, Yangqing; Ma, Lin

    2015-01-01

    Maintenance optimisation of series–parallel systems is a research topic of practical significance. Nevertheless, a cost-effective maintenance strategy is difficult to obtain due to the large strategy space for maintenance optimisation of such systems. The heuristic algorithm is often employed to deal with this problem. However, the solution obtained by the heuristic algorithm is not always the global optimum and the algorithm itself can be very time consuming. An alternative method based on linear programming is thus developed in this paper to overcome such difficulties by reducing strategy space of maintenance optimisation. A theoretical proof is provided in the paper to verify that the proposed method is at least as effective as the existing methods for strategy space reduction. Numerical examples for maintenance optimisation of series–parallel systems having multistate components and considering both economic dependence among components and multiple-level imperfect maintenance are also presented. The simulation results confirm that the proposed method is more effective than the existing methods in removing inappropriate maintenance strategies of multistate series–parallel systems. - Highlights: • A new method using linear programming is developed to reduce the strategy space. • The effectiveness of the new method for strategy reduction is theoretically proved. • Imperfect maintenance and economic dependence are considered during optimisation

  19. Ex-vessel remote maintenance for the Compact Ignition Tokamak

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Macdonald, D.

    1987-01-01

    The use of deuterium-tritium (D-T) fuel for operation of the Compact Ignition Tokamak (CIT) requires the use of remote handling technology to carry out maintenance operations on the machine. These operations consist in removing and repairing such components as diagnostic modules by using remotely operated maintenance equipment. The major equipment being developed for maintenance external to the plasma chamber includes a bridge-mounted manipulator system for test cell operations, decontamination (decon) equipment, hot cell equipment, and solid-radiation-waste-handling equipment. Wherever possible, the project will use commercially available equipment. Several areas of the maintenance system design were addressed in fiscal year (FY) 1987, including conceptual designs of manipulator systems, the start of a remote equipment research and development (RandD) program, and definition of the hot cell, decon, and equipment repair facility requirements. R and D work included preliminary demonstrations of remote handling operations on full-size, partial mock-ups of the CIT machine at the Oak Ridge National Laboratory (ORNL) Remote Operations and Maintenance Development (ROMD) Facility. 1 ref., 6 figs

  20. Instrumentalization of Eating Improves Weight Loss Maintenance in Obesity

    Directory of Open Access Journals (Sweden)

    Bodil Just Christensen

    2017-12-01

    Full Text Available Aim: The purpose of this study was to identify psychosocial determinants for maintaining weight loss. Methods: 42 obese individuals who achieved a 12% weight loss before entering a 52-week weight maintenance program were interviewed qualitatively. Psychosocial factors related to weight loss maintenance were identified in two contrasting groups: weight reducers and weight regainers. Groups were defined by health-relevant weight maintenance (additional weight loss > 3% at week 52, n = 9 versus weight gain > 3%, at week 52, n = 20. Results: Weight reducers reported structured meal patterns (p = 0.008, no comfort eating (p = 0.016 and less psychosocial stress (p = 0.04 compared to weight regainers. The ability to instrumentalize eating behavior emerged as an important factor (p = 0.007. Nutritional knowledge, motivation or exercise level did not differ between groups (p > 0.05. Conclusions: Successful weight loss maintenance was associated with an interplay between behavioral, affective and contextual changes. ‘Instrumentalization of eating behavior' seems to be an important element in long-term weight maintenance.

  1. Human factors interventions to reduce human errors and improve productivity in maintenance tasks

    International Nuclear Information System (INIS)

    Isoda, Hachiro; Yasutake, J.Y.

    1992-01-01

    This paper describes work in progress to develop interventions to reduce human errors and increase maintenance productivity in nuclear power plants. The effort is part of a two-phased Human Factors research program being conducted jointly by the Central Research Institute of Electric Power Industry (CRIEPI) in Japan and the Electric Power Research Institute (EPRI) in the United States. The overall objective of this joint research program is to identify critical maintenance tasks and to develop, implement and evaluate interventions which have high potential for reducing human errors or increasing maintenance productivity. As a result of the Phase 1 effort, ten critical maintenance tasks were identified. For these tasks, over 25 candidate interventions were identified for potential development. After careful analysis, seven interventions were selected for development during Phase 2. This paper describes the methodology used to analyze and identify the most critical tasks, the process of identifying and developing selected interventions and some of the initial results. (author)

  2. How and when will self-assessment improve maintenance of CANDU plants - evaluator's view

    International Nuclear Information System (INIS)

    Mika, K.

    1997-01-01

    Learning organizations use self-evaluation programs to compare their actual performance with their management's expectations and industry standards. In general, self-evaluations identify areas needing improvement. Self-evaluation activities in maintenance departments include self-assessments, management monitoring observations, root cause analyses, event investigations, benchmarking, use of operating experience, self-checking, and problem reporting systems. In Ontario Hydro Nuclear (OHN) we have used almost all forms of self-evaluation with mixed success. However, we did not use self-assessments. With emphasis on excellent maintenance this powerful form of self-evaluation is being introduced to all our plants. Because of its recency and relative inexperience with it, this paper is focused on self-assessment. The paper provides the author's perspective on how a self-assessment program would be evaluated by an independent internal evaluation and what attributes should be in place in order for maintenance departments to succeed in the implementation and successful continuation of the program. (author)

  3. Acceptability of financial incentives for maintenance of weight loss in mid-older adults: a mixed methods study.

    Science.gov (United States)

    McGill, Bronwyn; O'Hara, Blythe J; Grunseit, Anne C; Bauman, Adrian; Osborne, Dale; Lawler, Luke; Phongsavan, Philayrath

    2018-02-13

    Health insurers worldwide implement financial incentive schemes to encourage health-related behaviours, including to facilitate weight loss. The maintenance of weight loss is a public health challenge, and as non-communicable diseases become more prevalent with increasing age, mid-older adults could benefit from programs which motivate weight loss maintenance. However, little is understood about their perceptions of using financial incentives to maintain weight loss. We used mixed methods to explore the attitudes and views of participants who had completed an Australian weight loss and lifestyle modification program offered to overweight and obese health insurance members with weight-related chronic diseases, about the acceptability and usefulness of different types of financial incentives to support weight loss maintenance. An online survey was completed by 130 respondents (mean age = 64 years); and a further 28 participants (mean age = 65 years) attended six focus groups. Both independent samples of participants supported a formalised maintenance program. Online survey respondents reported that non-cash (85.2%) and cash (77%) incentives would be potentially motivating; but only 40.5% reported that deposit contracts would motivate weight loss maintenance. Results of in-depth discussions found overall low support for any type of financial incentive, but particularly deposit contracts and lotteries. Some participants expressed that improved health was of more value than a monetary incentive and that they felt personally responsible for their own health, which was at odds with the idea of financial incentives. Others suggested ongoing program and peer support as potentially useful for weight loss maintenance. If financial incentives are considered for mid-older Australian adults in the health insurance setting, program planners will need to balance the discordance between participant beliefs about the individual responsibility for health and their desire

  4. A two-stage preventive maintenance optimization model incorporating two-dimensional extended warranty

    International Nuclear Information System (INIS)

    Su, Chun; Wang, Xiaolin

    2016-01-01

    In practice, customers can decide whether to buy an extended warranty or not, at the time of item sale or at the end of the basic warranty. In this paper, by taking into account the moments of customers purchasing two-dimensional extended warranty, the optimization of imperfect preventive maintenance for repairable items is investigated from the manufacturer's perspective. A two-dimensional preventive maintenance strategy is proposed, under which the item is preventively maintained according to a specified age interval or usage interval, whichever occurs first. It is highlighted that when the extended warranty is purchased upon the expiration of the basic warranty, the manufacturer faces a two-stage preventive maintenance optimization problem. Moreover, in the second stage, the possibility of reducing the servicing cost over the extended warranty period is explored by classifying customers on the basis of their usage rates and then providing them with customized preventive maintenance programs. Numerical examples show that offering customized preventive maintenance programs can reduce the manufacturer's warranty cost, while a larger saving in warranty cost comes from encouraging customers to buy the extended warranty at the time of item sale. - Highlights: • A two-dimensional PM strategy is investigated. • Imperfect PM strategy is optimized by considering both two-dimensional BW and EW. • Customers are categorized based on their usage rates throughout the BW period. • Servicing cost of the EW is reduced by offering customized PM programs. • Customers buying the EW at the time of sale is preferred for the manufacturer.

  5. Nuclear power plant maintenance personnel reliability prediction (NPP/MPRP) effort at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Knee, H.E.; Haas, P.M.; Siegel, A.I.

    1981-01-01

    Human errors committed during maintenance activities are potentially a major contribution to the overall risk associated with the operation of a nuclear power plant (NPP). An NRC-sponsored program at Oak Ridge National Laboratory is attempting to develop a quantitative predictive technique to evaluate the contribution of maintenance errors to the overall NPP risk. The current work includes a survey of the requirements of potential users to ascertain the need for and content of the proposed quantitative model, plus an initial job/task analysis to determine the scope and applicability of various maintenance tasks. In addition, existing human reliability prediction models are being reviewed and assessed with respect to their applicability to NPP maintenance tasks. This paper discusses the status of the program and summarizes the results to date

  6. Age-dependent reliability model considering effects of maintenance and working conditions

    International Nuclear Information System (INIS)

    Martorell, Sebastian; Sanchez, Ana; Serradell, Vicente

    1999-01-01

    Nowadays, there is some doubt about building new nuclear power plants (NPPs). Instead, there is a growing interest in analyzing the possibility to extend current NPP operation, where life management programs play an important role. The evolution of the NPP safety depends on the evolution of the reliability of its safety components, which, in turn, is a function of their age along the NPP operational life. In this paper, a new age-dependent reliability model is presented, which includes parameters related to surveillance and maintenance effectiveness and working conditions of the equipment, both environmental and operational. This model may be used to support NPP life management and life extension programs, by improving or optimizing surveillance and maintenance tasks using risk and cost models based on such an age-dependent reliability model. The results of the sensitivity study in the example application show that the selection of the most appropriate maintenance strategy would directly depend on the previous parameters. Then, very important differences are expected to appear under certain circumstances, particularly, in comparison with other models that do not consider maintenance effectiveness and working conditions simultaneously

  7. Remote Operation and Maintenance Demonstration Facility at the Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Burgess, T.W.

    1986-01-01

    The Remote Operation and Maintenance Demonstration (ROMD) Facility at the Oak Ridge National Laboratory has been developed by the Consolidated Fuel Reprocessing Program to demonstrate remote handling concepts on advanced nuclear fuel reprocessing equipment and for other programs of national interest. The ROMD facility is a large-volume high-bay area that encloses a complete, technologically advanced remote maintenance system and full-scale development reprocessing equipment. The maintenance system consists of a full complement of teleoperated manipulators, manipulator transport systems, and overhead hoists that provide the capability of performing a large variety of remote handling tasks. This system has been used to demonstrate remote manipulation techniques for the US Department of Energy (DOE), the Power Reactor and Nuclear Fuels Development Corporation of Japan, the US Navy, and the National Aeronautics and Space Administration. Extensive tests of manipulative systems and remote maintainability of process equipment have been performed. This paper describes the ROMD facility and key remote maintenance equipment and presents a summary of major experimental activities. 7 refs., 6 figs

  8. The TFTR maintenance manipulator

    International Nuclear Information System (INIS)

    Kungl, D.; Loesser, D.; Heitzenroeder, P.; Cerdan, G.

    1989-01-01

    TFTR plans to begin D-T experiments in mid 1990. The D-T experimental program will produce approximately one hundred shots, with a neutron generation rate of 10 19 neutrons per shot. This will result in high levels of activation in TFTR, especially in the vacuum vessel. The primary purpose of the Maintenance Manipulator is to provide a means of remotely performing certain defined maintenance and inspection tasks inside the vacuum torus so as to minimize personnel exposure to radiation. The manipulator consists of a six-link folding boom connected to a fixed boom on a movable carriage. The entire manipulator is housed in a vacuum antechamber connected to the vacuum torus, through a port formerly used for a vacuum pumping duct. The configuration extends 180 0 in either direction to provide complete coverage of the torus. The four 3500 l/s turbopumps which were formerly used in the pumping duct will be mounted on the antechamber. The manipulator will utilize two end effectors. The first, called a General Inspection Arm (GIA) provides a movable platform to an inspection camera and an in-vacuum leak detector. The second is a bilateral, force-reflecting pair of slave arms which utilize specially developed tools to perform several maintenance functions. All components except the slave arms are capable of operating in TFTR's vacuum environment and during 150 0 C bakeout of the torus. (orig.)

  9. Bridge maintenance Program for the City of Columbia, Missouri : final report.

    Science.gov (United States)

    2017-09-22

    The goal of this project was to extend the service lives of bridges located in Columbia, Missouri. The objective of the project was to develop guidelines for bridge maintenance and preservation. The guidelines developed are focused on practical and i...

  10. Minimum maintenance solar pump | Assefa | Zede Journal

    African Journals Online (AJOL)

    A minimum maintenance solar pump (MMSP), Fig 1, has been simulated for Addis Ababa, taking solar meteorological data of global radiation, diffuse radiation and ambient air temperature as input to a computer program that has been developed. To increase the performance of the solar pump, by trapping the long-wave ...

  11. Nuclear power plant maintenance optimisation SENUF network activity

    Energy Technology Data Exchange (ETDEWEB)

    Ahlstrand, R.; Bieth, M.; Pla, P.; Rieg, C.; Trampus, P. [Inst. for Energy, EC DG Joint Research Centre, Petten (Netherlands)

    2004-07-01

    During providing scientific and technical support to TACIS and PHARE nuclear safety programs a large amount of knowledge related to Russian design reactor systems has accumulated and led to creation of a new Network concerning Nuclear Safety in Central and Eastern Europe called ''Safety of Eastern European type Nuclear Facilities'' (SENUF). SENUF contributes to bring together all stakeholders of TACIS and PHARE: beneficiaries, end users, Eastern und Western nuclear industries, and thus, to favour fruitful technical exchanges and feedback of experience. At present the main focus of SENUF is the nuclear power plant maintenance as substantial element of plant operational safety as well as life management. A Working Group has been established on plant maintenance. One of its major tasks in 2004 is to prepare a status report on advanced strategies to optimise maintenance. Optimisation projects have an interface with the plant's overall life management program. Today, almost all plants involved in SENUF network have an explicit policy to extend their service life, thus, component ageing management, modernization and refurbishment actions became much more important. A database is also under development, which intends to help sharing the available knowledge and specific equipment and tools. (orig.)

  12. Infrared thermography program at Darlington NGD

    International Nuclear Information System (INIS)

    Speer, B.

    1997-01-01

    Infrared thermography is a proven predictive maintenance tool for improving equipment reliability and reducing maintenance costs. It has been identified as one of the maintenance technologies that could contribute to the reduction of OHN forced incapability factor. At Darlington NGD a program has been established by combining OHN and Nuclear Maintenance Applications Center (NMAC) operating experience. This presentation outlines the development and implementation of this program. The main points are: roles and responsibilities, equipment selection, software requirements, manpower level, inspection equipment, training and a cost/benefit review. (author)

  13. Preventive maintenance: optimization of time - based discard decisions at the bruce nuclear generating station

    International Nuclear Information System (INIS)

    Doyle, E.K.; Jardine, A.K.S.

    2001-01-01

    The use of various maintenance optimization techniques at Bruce has lead to cost effective preventive maintenance applications for complex systems. As previously reported at ICONE 6 in New Orleans, 1996, several innovative practices reduced Reliability Centered Maintenance costs while maintaining the accuracy of the analysis. The optimization strategy has undergone further evolution and at the present an Integrated Maintenance Program (IMP) is in place where an Expert Panel consisting of all players/experts proceed through each system in a disciplined fashion and reach agreement on all items under a rigorous time frame. It is well known that there are essentially 3 maintenance based actions that can flow from a Maintenance Optimization Analysis: condition based maintenance, time based maintenance and time based discard. The present effort deals with time based discard decisions. Maintenance data from the Remote On-Power Fuel Changing System was used. (author)

  14. Evaluating the Effects of Maintenance Resource Management (MRM) Interventions in Airline Safety

    Science.gov (United States)

    1998-02-01

    The present paper seeks to describe and validate the effectiveness of five change programs (generically termed Maintenance Resource Management, or "MRM"). The activities evaluated here are in the middle stages of an ongoing MRM training program, or t...

  15. Remote maintenance for a new generation of hot cells

    International Nuclear Information System (INIS)

    Feldman, M.J.; Grant, N.R.

    1987-01-01

    For several years the Consolidated Fuel Reprocessing Program (CFRP) at Oak Ridge National Laboratory (ORNL) has been developing facility concepts, designing specialized equipment, and testing prototypical hardware for reprocessing spent fuel from fast breeder reactors. The major facility conceptual design, the Hot Experimental Facility, was based on total remote maintenance to increase plant availability and to reduce radiation exposure. This thrust included designing modular equipment to facilitate maintenance and the manipulation necessary to accomplish maintenance. Included in the design repetoire was the development effort in advanced servomanipulator systems, a remote sampling system, television viewing, and a transporter for manipulator positioning. Demonstration of these developed items is currently ongoing, and the technology is available for applications where production operations in highly radioactive environments are required

  16. Remote maintenance lessons learned on prototypical reprocessing equipment

    International Nuclear Information System (INIS)

    Kring, C.T.; Schrock, S.L.

    1990-01-01

    A major objective of the Consolidated Fuel Reprocessing Program at the Oak Ridge National Laboratory is to develop and demonstrate the technology required to reprocess spent nuclear fuel. The Fuel Recycle Division, over the past 16 years, has undertaken this objective by designing and testing prototypical hardware representing essentially every major equipment item currently included in most fuel reprocessing plant conceptual designs. These designs are based on total remote maintenance to increase plant availability and reduce radiation exposure to plant operators. The designs include modular equipment to facilitate maintainability and the remote manipulation necessary to accomplish maintenance tasks. Prototypic equipment has been installed and tested in a cold mock-up of a reprocessing hot cell, called the remote operations and maintenance demonstration facility. The applied maintenance concept utilizes the dexterity and mobility of bridge-mounted, force-reflecting servomanipulators. Prototypic processing equipment includes a remote disassembly system, a remote shear system, a rotary dissolver, a remote automated sampler system, removable equipment racks to support chemical process equipment items, and the advanced servomanipulators. Each of these systems and a brief description of functions are discussed

  17. The Report of Maintenance and Management Optimization for the Korean Fossil Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Ha, J.S.; Yoo, K.B.; Chung, H.; Chang, S.H. [Korea Electric Power Research Institute, Taejon (Korea)

    2002-07-01

    For the Korean fossil power plants, the main component and facillities were classified by maintainability, reliability, production, cost model to assess the cost effective performance of a power plant's maintenance. Maintenance program interacts with the generation process and estimates the leverage provided by expenditures on preventive maintenance. This optimization method is an engineering tool for tracking each asset's production and cost performance under appropriate engineering approximations. Thus, it provides useful insights into where maintenance resources can be expended most effectively to increase generation and reduce operating costs. (author). 7 refs., 3 tabs.

  18. Fusion reactor remote maintenance study. Final report

    International Nuclear Information System (INIS)

    Sniderman, M.

    1979-04-01

    An analysis of a major maintenance operation, the remote replacement of a modular sector of a tokamak reactor, was performed in substantial detail. Specific assumptions were developed which included concepts from various existing designs so that the operation which was studied includes some design features generic to any fusion reactor design. Based on the work performed in this study, the principal conclusions are: (1) It appears feasible to design a tokamak fusion reactor plant with availability comparable to existing fossil and fission plants, but this will require diligence and comprehensive planning during the complete design phase. (2) Since the total fusion program is paced by the success of each device, maintenance considerations must be incorporated into each device during design, even if the device is an experimental unit. (3) Innovative approaches, such as automatic computer controlled operations, should be developed so that large step reductions in planned maintenance times can be achieved

  19. Preventive maintenance-A countermeasure to plant aging

    International Nuclear Information System (INIS)

    Hlubek, W.

    1985-01-01

    The aging of power plants is caused by manifold and different influences. For instance, mechanical and thermal stress, radiation exposure, denting or wastage can considerably affect the aging of plant components and thus cause premature failures of components. In this presentation, the term 'Plant Aging' in nuclear power plants is to be understood more comprehensively than wear on components and material fatigue. In addition, nuclear power plants are to be adjusted to the advancing state of the science and technology (state-of-the-art) in order to guarantee safe operation at all times. The preventive maintenance - as a countermeasure to plant aging - comprises the systematic checks and servicing of the plant systems in operation and follows aging by inspection and tests. Experience with Rheinisch-Westfaelisches Elektrizitaetswerk AG (RWE) preventive maintenance program at the Biblis NNP (1300 MW, PWR) is discussed. The concept of an 'Integrated Maintenance System' as a means to avoid 'Plant Aging' is presented

  20. Maintenance management for nuclear power plant 'Integrated valve maintenance'

    International Nuclear Information System (INIS)

    Gerner, P.; Zanner, G.

    2001-01-01

    The deregulation of Europe's power market does force many utilities, and especially nuclear power plant operators, to introduce extensive cost-cutting measures in order to be able to compete within this new environment. The optimization of plant outages provides considerable potential for raising plant availability but can also lower operating costs by reducing e.g. expenditure on maintenance. Siemens Nuclear Power GmbH, in cooperation with plant operators, is currently implementing new and improved service concepts which can have a major effect on the way in which maintenance will be performed in the future. Innovative service packages for maintenance in nuclear power plants are available which can be used to perform a time- and cost-effective maintenance. The concepts encompass optimization of the overall sequence from planning in advance to the individual measures including reduction of the scope of maintenance activities, identification of cost cutting potential and bundling of maintenance activities. The main features of these maintenance activities are illustrated here using the examples of outage planning and integrated valve maintenance. In nuclear power plants approx. 5000 valves are periodically preventively, condition-based or breakdown-based maintained. Because of this large number of valves to be maintained a high potential of improvements and cost reductions can be achieved by performing an optimized, cost-effective maintenance based on innovative methods and tools. Siemens Nuclear Power GmbH has developed and qualified such tools which allow to reduce service costs while maintaining high standards of safety and availability. By changing from preventive to predictive (condition-based) maintenance - the number of valves to be maintained may be reduced considerably. The predictive maintenance is based on the Siemens Nuclear Power GmbH diagnostic and evaluation method (ADAM). ADAM is used to monitor the operability of valves by analytical verification of

  1. New maintenance strategy of Tokyo Electric Power Company and Fukushima Dai-ichi Nuclear Power Plant for effective ageing management and safe long-term operation

    International Nuclear Information System (INIS)

    Inagaki, Takeyuki; Yamashita, Norimichi

    2009-01-01

    Fukushima Dai-ichi Nuclear Power Plant is the oldest among three nuclear power plants owned and operated by Tokyo Electric Power Company, which consists of six boiling water reactor units. The commercial operation of Unit 1 was commenced in 1971 (37 years old) and Unit 6 in 1978 (29 years old). Currently ageing degradations of systems, structures and components are managed through maintenance programs, component replacement/refurbishment programs and long-term maintenance plans. The long-term maintenance plans are established through ageing management component replacement/refurbishment programs reviews performed before the 30th year of operation and they are for safe and reliable operation after 30 years (long-term operation). However the past maintenance actions and past component replacement/refurbishment programs were not always proactive and past operational experience and maintenance practices suggest that effective/proactive ageing management programs be introduced in earlier stage of the plant operation. In this circumstance, Tokyo Electric Power Company and Fukushima Dai-ichi Nuclear Power Plant are setting up a new maintenance strategy that includes 1) improving the normal maintenance programs by using ageing degradation data, 2) effective use of information on internal/external operational experience and maintenance practices related to ageing, and 3) proactive component/equipment refurbishment programs during a refreshment outage for safe and reliable long-term operation. To accomplish the goal of this strategy, strengthening engineering capability of plant staff members is a crucial required for the plant. The objective of this paper is to briefly explain main results ageing management reviews, past and current significant ageing issues and management programs against them, and the new maintenance strategy established by Tokyo Electric Power Company and Fukushima Dai-ichi Nuclear Power Plant. (author)

  2. 25 CFR 170.807 - What must BIA include when it develops an IRR Transportation Facilities Maintenance Management...

    Science.gov (United States)

    2010-04-01

    ... Transportation Facilities Maintenance Management System? 170.807 Section 170.807 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.807 What must BIA include when it develops an IRR Transportation Facilities Maintenance Management System...

  3. Applicability of Operational Research Techniques in CANDU Nuclear Plant Maintenance

    International Nuclear Information System (INIS)

    Doyle, E. Kevin

    2002-01-01

    As previously reported at ICONE 6 in New Orleans, 1996, and ICONE 9 in Niece, 2001, the use of various maintenance optimization techniques at Bruce has lead to cost effective preventive maintenance applications for complex systems. Innovative practices included greatly reducing Reliability Centered Maintenance (RCM) costs while maintaining the accuracy of the analysis. The optimization strategy has undergone further evolution and at the present an Integrated Maintenance Program (IMP) is being put in place. Further cost refinement of the station preventive maintenance strategy whereby decisions are based on statistical analysis of historical failure data is being evaluated. A wide range of Operational Research (OR) literature was reviewed for implementation issues and several encouraging areas were found that will assist in the current effort of evaluating maintenance optimization techniques for nuclear power production. The road ahead is expected to consist first of resolving 25 years of data issues and preserving the data via appropriate knowledge system techniques while post war demographics permit experts to input into the system. Subsequent analytical techniques will emphasize total simplicity to obtain the requisite buy in from Corporate Executives who possibly are not trained in Operational Research. Case studies of containment airlock seal failures are used to illustrate the direct applicability of stochastic processes. Airlocks and transfer chambers were chosen as they have long been known as high maintenance items. Also, the very significant financial consequences of this type of failure will help to focus the attention of Senior Management on the effort. Despite substantial investment in research, improvement in the design of the seal material or configuration has not been achieved beyond the designs completed in the 1980's. Overall, the study showed excellent agreement of the relatively quick stochastic methods with the maintenance programs produced at

  4. A Portable Cell Maintenance System for Rapid Toxicity Monitoring Final Report CRADA No. TC-02081-04

    Energy Technology Data Exchange (ETDEWEB)

    Kane, S. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Zhou, P. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-09-27

    The Phase I STTR research project was targeted at meeting the objectives and requirements stated in STTR solicitation A04-T028 for a Portable Cell Maintenance System for Rapid Toxicity Monitoring. In accordance with the requirements for STTR programs, collaboration was formed between a small business, Kionix, Inc., and The Regents of the University of California, Lawrence Livermore National Laboratory (LLNL). The collaboration included CytoDiscovery, Inc. (CDI) which, in collaboration with Kionix, provided access to membrane chip technology and provided program support and coordination. The objective of the overall program (excerpted from the original solicitation) was: “To develop a small, portable cell maintenance system for the transport, storage, and monitoring of viable vertebrate cells and tissues.” The goal of the Phase I project was to demonstrate the feasibility of achieving the program objectives utilizing a system comprised of a small-size, microfluidic chip-based cell maintenance cartridge (CMC) and a portable cell maintenance system (CMS) capable of housing a minimum of four CMCs. The system was designed to be capable of optimally maintaining multiple vertebrate cell types while supporting a wide variety of cellular assays.

  5. Optimizing stormwater treatment practices a handbook of assessment and maintenance

    CERN Document Server

    Erickson, Andrew J; Gulliver, John S

    2013-01-01

    Optimizing Stormwater Treatment Practices: A Handbook of Assessment and Maintenance provides the information necessary for developing and operating an effective maintenance program for stormwater treatment. The book offers instructions on how to measure the level of performance of stormwater treatment practices directly and bases proposed maintenance schedules on actual performance and historical maintenance efforts and costs. The inspection methods, which are proven in the field and have been implemented successfully, are necessary as regulatory agencies are demanding evaluations of the performance of stormwater treatment practices. The authors have developed a three-tiered approach that offers readers a standard protocol for how to determine the effectiveness of stormwater treatment practices currently in place. This book also: Provides a standard protocol for how to determine the effectiveness of stormwater treatment practices Assists readers with identifying which assessment techniques to use for stormwa...

  6. The maintenance management framework models and methods for complex systems maintenance

    CERN Document Server

    Crespo Márquez, Adolfo

    2010-01-01

    “The Maintenance Management Framework” describes and reviews the concept, process and framework of modern maintenance management of complex systems; concentrating specifically on modern modelling tools (deterministic and empirical) for maintenance planning and scheduling. It will be bought by engineers and professionals involved in maintenance management, maintenance engineering, operations management, quality, etc. as well as graduate students and researchers in this field.

  7. Preventive maintenance basis: Volume 21 -- HVAC, air handling equipment. Final report

    International Nuclear Information System (INIS)

    Worledge, D.; Hinchcliffe, G.

    1997-12-01

    US nuclear plants are implementing preventive maintenance (PM) tasks with little documented basis beyond fundamental vendor information to support the tasks or their intervals. The Preventive Maintenance Basis project provides utilities with the technical basis for PM tasks and task intervals associated with 40 specific components such as valves, electric motors, pumps, and HVAC equipment. This report provides an overview of the PM Basis project and describes use of the PM Basis database. Volume 21 of the report provides a program of PM tasks suitable for application to HVAC-Air Handling Equipment. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used, in conjunction with material from other sources, to develop a complete PM program or to improve an existing program. Users of this information will be utility managers, supervisors, craft technicians, and training instructors responsible for developing, optimizing, or fine-tuning PM programs

  8. Preventive maintenance basis: Volume 15 -- Rotary screw air compressors. Final report

    International Nuclear Information System (INIS)

    Worledge, D.; Hinchcliffe, G.

    1997-07-01

    US nuclear plants are implementing preventive maintenance (PM) tasks with little documented basis beyond fundamental vendor information to support the tasks or their intervals. The Preventive Maintenance Basis project provides utilities with the technical basis for PM tasks and task intervals associated with 40 specific components such as valves, electric motors, pumps, and HVAC equipment. This report provides an overview of the PM Basis project and describes use of the PM Basis database. Volume 15 of the report provides a program of PM tasks suitable for application to rotary screw air compressors in nuclear power plants. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used, in conjunction with material from other sources, to develop a complete PM program or to improve an existing program. Users of this information will be utility managers, supervisors, craft technicians, and training instructors responsible for developing, optimizing, or fine-tuning PM programs

  9. Improving the TRIGA facility maintenance by predictive maintenance techniques

    International Nuclear Information System (INIS)

    Preda, M.; Sabau, C.; Barbalata, E.

    1997-01-01

    This work deals with the specific operation of equipment in radioactive environment or in conditions allowing radioactive contamination. The requirements of remote operation ensuring the operators' protection are presented. Also, the requirements of international standards issued by IAEA-Vienna are reviewed. The organizational withdraws of the maintenance activities, based on the standards and maintenance and repair directives still in force, are shown. It is emphasized the fact that this type of maintenance was adequate to a given level of technical development, characteristic for pre-computerized industry, but, at present, it is obsolete and uneconomic both in utilization and maintenance. Such a system constitutes already a burden hindering the efforts of maximizing the availability, maintenance, prolongation the service life of equipment and utilities, finally, of increasing the efficiency of complex installations. Moreover, the predictive maintenance techniques are strongly requested by the character of radioactive installations precluding the direct access in given zones (a potential risk of irradiation or radioactive contamination) of installations during operation. The results obtained by applying the predictive maintenance techniques in the operation of the double circuit irradiation loop, used in the TRIGA reactors, are presented

  10. Industrial Maintenance Strategies

    International Nuclear Information System (INIS)

    Sajjad Akbar

    2006-01-01

    Industrial plants have become more complex due to technological advancement. This has made the task of maintenance more difficult. The maintenance costs in terms of resources and downtime loss are so high that maintenance function has become a critical factor in a plant's profitability. Industry should devote as much forethought to the management of maintenance function as to production. Maintenance has grown from an art to a precise, technical engineering science. Planning, organizing scheduling and control of maintenance using modern techniques pays dividends in the form of reduced costs and increased reliability. The magnitude and the dimension of maintenance have multiplied due to development in the engineering technologies. Production cost and capacities are directly affected by the breakdown time. Total operating cost including the maintenance cost plays an important role in replacement dimension. The integrated system approach would bring forth the desired results of high maintenance standards. The standards once achieved and sustained, would add to the reliability of the plan and relieve heavy stresses and strains on the engineering logistic support. (author)

  11. Study on the Management for the Nuclear Power Plant Maintenance and Equipment Reliability

    International Nuclear Information System (INIS)

    Yoon, Kyeongseop; Lee, Sangheon; Kim, Myungjin; Lee, Unjang

    2015-01-01

    In our country, many studies on the regulatory policy of the plant maintenance have ever been performed since 1998, but the relevant regulatory requirements were not established yet. These background mentioned above request us to study on the regulation policy and maintenance plan to improve the safety, reliability and efficiency of NPP. To solve these problems, in this study, we deduct the management methodology for the improvement of NPP maintenance and equipment reliability that is essential to secure the safety and efficiency of the commercial NPP. For analysis the maintenance and equipment reliability management methodology in overseas NPP. We studied maintenance and equipment reliability of USA, Canada and Europe(France, England, German). We also studied status and application condition of Korean NPP maintenance management technical development. We deducted an effective maintenance methodology that is needed to Korean NPP, as a result of comparison on the technical trend of the maintenance management between overseas and Korean, such like following. - Regulation form ·Specific provision of regulation requirement and application of form that is clarifying application standard - Maintenance management methodology, Maintenance management program. This results of study could be applied for regulation policy, law and guideline establishment of NPP maintenance, operation, supervision and a system establishment for maintenance management, education data about maintenance for NPP employees

  12. Optimization of maintenance periodicity of complex of NPP safety systems

    International Nuclear Information System (INIS)

    Kolykhanov, V.; Skalozubov, V.; Kovrigkin, Y.

    2006-01-01

    The analysis of the positive and negative aspects connected to maintenance of the safety systems equipment which basically is in a standby state is executed. Tests of systems provide elimination of the latent failures and raise their reliability. Poor quality of carrying out the tests can be a source of the subsequent failures. Therefore excess frequency of tests can result in reducing reliability of safety systems. The method of optimization of maintenance periodicity of the equipment taking into account factors of its reliability and restoration procedures quality is submitted. The unavailability factor is used as a criterion of optimization of maintenance periodicity. It is offered to use parameters of reliability of the equipment and each of safety systems of NPPs received at developing PSA. And it is offered to carry out the concordance of maintenance periodicity of systems within the NPP maintenance program taking into account a significance factor of the system received on the basis of the contribution of system in CDF. Basing on the submitted method the small computer code is developed. This code allows to calculate reliability factors of a separate safety system and to determine optimum maintenance periodicity of its equipment. Optimization of maintenance periodicity of a complex of safety systems is stipulated also. As an example results of optimization of maintenance periodicity at Zaporizhzhya NPP are presented. (author)

  13. An analysis of the impacts of economic incentive programs on commercial nuclear power plant operations and maintenance costs

    International Nuclear Information System (INIS)

    Kavanaugh, D.C.; Monroe, W.H.; Wood, R.S.

    1996-02-01

    Operations and Maintenance (O and M) expenditures by nuclear power plant owner/operators possess a very logical and vital link in considerations relating to plant safety and reliability. Since the determinants of O and M outlays are considerable and varied, the potential linkages to plant safety, both directly and indirectly, can likewise be substantial. One significant issue before the US Nuclear Regulatory Commission is the impact, if any, on O and M spending from state programs that attempt to improve plant operating performance, and how and to what extent these programs may affect plant safety and pose public health risks. The purpose of this study is to examine the role and degree of impacts from state promulgated economic incentive programs (EIPs) on plant O and M spending. A multivariate regression framework is specified, and the model is estimated on industry data over a five-year period, 1986--1990. Explanatory variables for the O and M spending model include plant characteristics, regulatory effects, financial strength factors, replacement power costs, and the performance incentive programs. EIPs are found to have statistically significant effects on plant O and M outlays, albeit small in relation to other factors. Moreover, the results indicate that the relatively financially weaker firms are more sensitive in their O and M spending to the presence of such programs. Formulations for linking spending behavior and EIPs with plant safety performance remains for future analysis

  14. Knowledge based maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Sturm, A [Hamburgische Electacitaets-Werke AG Hamburg (Germany)

    1998-12-31

    The establishment of maintenance strategies is of crucial significance for the reliability of a plant and the economic efficiency of maintenance measures. Knowledge about the condition of components and plants from the technical and business management point of view therefore becomes one of the fundamental questions and the key to efficient management and maintenance. A new way to determine the maintenance strategy can be called: Knowledge Based Maintenance. A simple method for determining strategies while taking the technical condition of the components of the production process into account to the greatest possible degree which can be shown. A software with an algorithm for Knowledge Based Maintenance leads the user during complex work to the determination of maintenance strategies for this complex plant components. (orig.)

  15. Knowledge based maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Sturm, A. [Hamburgische Electacitaets-Werke AG Hamburg (Germany)

    1997-12-31

    The establishment of maintenance strategies is of crucial significance for the reliability of a plant and the economic efficiency of maintenance measures. Knowledge about the condition of components and plants from the technical and business management point of view therefore becomes one of the fundamental questions and the key to efficient management and maintenance. A new way to determine the maintenance strategy can be called: Knowledge Based Maintenance. A simple method for determining strategies while taking the technical condition of the components of the production process into account to the greatest possible degree which can be shown. A software with an algorithm for Knowledge Based Maintenance leads the user during complex work to the determination of maintenance strategies for this complex plant components. (orig.)

  16. Nuclear facilities maintenance in the core of management-advanced trend in IBM Maximo asset management applications

    International Nuclear Information System (INIS)

    Seino, Satoshi; Ujihara, Satoshi; Kikuyama, Kaoru

    2009-01-01

    European and US plant owners have attached importance to plant maintenance, such as prompt grasp of plant states, implementation of maintenance and planning of maintenance programs, as one of asset management. The US advanced trend was introduced in this feature article through the applications of IBM Maximo Asset Management for nuclear facilities maintenance. World trends of nuclear power and related problems, need of nuclear facilities management, key items for introduction of maintenance management systems, required systems for nuclear maintenance management and introduction of functions of the IBM strategic asset management solution-Maximo were described respectively. (T. Tanaka)

  17. State of technology, system and solution supporting on-line maintenance - company's activities and products

    International Nuclear Information System (INIS)

    Nishitani, Junichi; Shimizu, Shunichi; Higasa, Hisakazu

    2010-01-01

    The new inspection system based on operator's maintenance and monitoring program of nuclear power plants was introduced in Japan more than one year ago and recommended on-line maintenance (maintenance during operation) will be carried out to increase capacity factor with safe and reliable operation of the plant. In this feature article, nine experts described the state of technology, system and solution supporting on-line maintenance - company's activities and products. These were titled as 'MHI's technology supporting on-line maintenance'. 'Technology supporting on-line maintenance - Toshiba's activities to upgrade monitoring and diagnostic service and maintenance management', 'AsahiKASEI's activities of on-line maintenance', 'Importance of information sharing of on-line maintenance and its ideal method-function of impact plan of IBM Maximo Asset Management for Nuclear', 'US's on-line maintenance and information systems', 'SmartProcedures realizing safe operation of nuclear power plant - proposal of computerized procedures', 'Ultrasonic leak detection system SDT170', 'Application of infrared thermography for equipment maintenance in nuclear power plant' and 'On-line condition monitoring system - condition eye'. (T. Tanaka)

  18. AUTOMOTIVE DIESEL MAINTENANCE 1. UNIT IV, MAINTAINING THE COOLING SYSTEM--DETROIT DIESEL ENGINES.

    Science.gov (United States)

    Human Engineering Inst., Cleveland, OH.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE OPERATION AND MAINTENANCE OF THE DIESEL ENGINE COOLING SYSTEM. TOPICS ARE PURPOSE OF THE COOLING SYSTEM, CARE MAINTENANCE OF THE COOLING SYSTEM, COOLING SYSTEM COMPONENTS, AND TROUBLESHOOTING TIPS. THE MODULE CONSISTS OF A SELF-INSTRUCTIONAL BRANCH PROGRAMED TRAINING…

  19. Twelfth biennial conference on reactor operating experience maintenance and modifications for availability and efficiency

    International Nuclear Information System (INIS)

    1985-01-01

    Separate abstracts were prepared for the papers presented in the following topical sessions: (1) Formal Availability Improvement Programs; (2) Maintenance Aids and Diagnostics; (3) Nuclear Plant Inspection and Testing; (4) Secondary Cycle Improvement to Programs; (5) Recent Plant Experiences; (6) Training, Research, and Test Reactors; (7) Impact of Plant Maintenance on Availability; (8) Intragranular Stress Corrosion Cracking: Repair, Inspection, and Mitigating Techniques; (9) Availability Improvement - Recent Development and Trends; (10) Water Chemistry and Corrosion Control; and (11) ALARA: Experiences with Dose Reduction

  20. Plant services (maintenance) foreman training. Inception to implementation

    International Nuclear Information System (INIS)

    Dunlap, M.S.

    1991-01-01

    Training content and time allocated for training have become essential and auditable commodities. This additional awareness, by upper management, has increased the pressure on training organizations to demonstrate effective and efficient programs. Structured program design and administration can assist training organizations in meeting these requirements and assuring a quality program. Sequential development of the job analysis, qualification standard, associated lesson plans, and a methodology for tracking program changes which affect the system, are all required components in a systematic approach to training. This paper addresses these facets in establishing a training program. It describes the methods utilized, problems identified and resolved as they occurred in the development of the Westinghouse Idaho Nuclear Company (WINCO) Plant Services (Maintenance) Foreman Training Program

  1. Transformer oil maintenance

    Energy Technology Data Exchange (ETDEWEB)

    White, J. [A.F. White Ltd., Brantford, ON (Canada)

    2002-08-01

    Proactive treatment is required in the case of transformer oil, since the oil degrades over time, which could result in the potential failure of the transformer or costly repairs. A mineral-based oil is used for transformers because of its chemical properties and dielectric strength. Water and particulate are the main contaminants found in transformer oil, affecting the quality of the oil through reduced insulation. Acid that forms in the oil when reacting with oxygen is called oxidization. It reduces the heat dissipation of the transformer as the acid forms sludge which settles on the windings of the transformer. The first step in the preventive maintenance program associated with transformer oil is the testing of the oil. The base line is established through initial testing, and subsequent annual testing identifies any changes. The minimal requirements are: (1) dielectric breakdown, a measure of the voltage conducted by the oil; (2) neutralization/acid number, which detects the level of acid present in the oil; (3) interfacial tension, which identifies the presence of polar compounds; (4) colour, which displays quality, aging and the presence of contaminants; and (5) water, which decreases the dielectric breakdown voltage. The analysis of the gases present in the oil is another useful tool in a maintenance program for the determination of a possible fault such as arcing, corona or overheated connections and is accomplished through Dissolved Gas Analysis (DGA). Remediation treatment includes upgrading the oil. Ideally, reclamation should be performed in the early stages of the acid buildup before sludging occurs. Onsite reclamation includes Fuller's earth processing and degasification, a process briefly described by the author.

  2. The Use of Biosimulation in the Design of a Novel Multi-level Weight Loss Maintenance Program for Overweight Children

    Science.gov (United States)

    Wilfley, Denise E.; Van Buren, Dorothy J.; Theim, Kelly R.; Stein, Richard I.; Saelens, Brian E.; Ezzet, Farkad; Russian, Angela C.; Perri, Michael G.; Epstein, Leonard H.

    2011-01-01

    Objective Weight loss outcomes achieved through conventional behavior change interventions are prone to deterioration over time. Basic learning laboratory studies in the area of behavioral extinction and renewal and multi-level models of weight control offer clues as to why newly acquired weight loss skills are prone to relapse. According to these models, current clinic-based interventions may not be of sufficient duration or scope to allow for the practice of new skills across the multiple community contexts necessary to promote sustainable weight loss. Although longer, more intensive interventions with greater reach may hold the key to improving weight loss outcomes, it is difficult to test these assumptions in a time efficient and cost-effective manner. A research design tool that has been increasingly utilized in other fields (e.g., pharmaceuticals) is the use of biosimulation analyses. The present paper describes our research team's use of computer simulation models to assist in designing a study to test a novel, comprehensive socio-environmental treatment approach to weight loss maintenance in children ages 7 to 12 years. Methods Weight outcome data from the weight loss, weight maintenance, and follow-up phases of a recently completed randomized controlled trial (RCT) were used to describe the time course of a proposed, extended multi-level treatment program. Simulations were then conducted to project the expected changes in child percent overweight trajectories in the proposed study. Results A 12.9% decrease in percent overweight at 30 months was estimated based upon the midway point between models of “best-case” and “worst-case” weight maintenance scenarios. Conclusions Preliminary data and further analyses, including biosimulation projections, suggest that our socio-environmental approach to weight loss maintenance treatment is promising and warrants evaluation in a large-scale RCT. Biosimulation techniques may have utility in the design of future

  3. The nuclear power plant maintenance personnel reliability prediction (NPP/MPRP) effort at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Knee, H.E.; Haas, P.M.; Siegel, A.I.

    1982-01-01

    Human errors committed during maintenance activities are potentially a major contribution to the overall risk associated with the operation of a nuclear power plant (NPP). An NRC-sponsored program at Oak Ridge National Laboratory is attempting to develop a quantitative predictive technique to evaluate the contribution of maintenance errors to the overall NPP risk. The current work includes a survey of the requirements of potential users to ascertain the need for and content of the proposed quantitative model, plus an initial job/task analysis to determine the scope and applicability of various maintenance tasks. In addition, existing human reliability prediction models are being reviewed and assessed with respect to their applicability to NPP maintenance tasks. This paper discusses the status of the program and summarizes the results to date

  4. TRUPACT-II Operating and Maintenance Instructions

    Energy Technology Data Exchange (ETDEWEB)

    Westinghouse Electric Corporation, Waste Isolation Division

    1999-12-31

    The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II) Shipping Package and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP) and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9218. In the event there is a conflict between this document and the TRUPACT-II SARP, the TRUPACT-II SARP shall govern. TRUPACT-II C of C number 9218 states, ''... each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application.'' It further states, ''... each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the application.'' Chapter 9 of the TRUPACT-II SARP charges the Westinghouse Electric Corporation Waste Isolation Division (WID) with assuring that the TRUPACT-II is used in accordance with the requirements of the C of C. To meet this requirement and verify consistency of operations when loading and unloading the TRUPACT-II on the trailer, placing a payload in the packaging, unloading the payload from the packaging, or performing maintenance, the U.S. Department of Energy Carlsbad Area Office (U.S. DOE/CAO) finds it necessary to implement the changes that follow. This TRUPACT-II maintenance document represents a change to previous philosophy regarding site specific procedures for the use of the TRUPACT-II. This document details the instructions to be followed to consistently operate and maintain the TRUPACT-II. The intent of these instructions is to ensure that all users of the TRUPACT-II follow the same or equivalent instructions. Users may achieve this intent by any of the following methods: (1

  5. Managing and controlling maintenance

    International Nuclear Information System (INIS)

    Chavez, G.; Perla, H.F.

    1980-01-01

    A well-planned maintenance-management program can bring organized yet flexible scheduling, improved productivity, and a ready-access data bank. The system detailed in the article, developed for a nuclear power plant, has application to any equipment-intensive facility. Key features of the system include: documentation of all work requirements and their completion; automated prioritizing of work orders; automatic generation of work orders for repetitive work, when due; work lists in priority sequence; deferred, standby, and outage work reports; labor and work-order backlog information; equipment work histories and cumulative failure data

  6. Excellence method in maintenance with application for cryogenic nuclear unit (EMAC)

    International Nuclear Information System (INIS)

    Anghel, Vasile

    2006-01-01

    Full text: Cryogenic Nuclear Plant (CNP) has as main objectives the development of a technology for the removal of tritium from heavy water used in nuclear plants of CANDU type and finding of a methodology for complete inspection of the equipment used in the presence of tritium at very low temperatures. These aims imply achieving two main stages. The first stage concerns the maintenance conception on a scientific basis, while the second stage concerns the implementation. The first stage implies the management of maintenance in constraints relating to quality, risk and cost. The second stage regards the aspect of design and technology of CNP maintenance. The solution adequate with this conception will lead to a solution viable for implementation. The operative maintenance will be based on RCM (Reliability Centered Maintenance), using NOLAN and HEAP 1978 methodologies. The integrated maintenance through research and implementation demonstrates the design, realization of equipment, the dynamic and and the static complex uses of EMAC in CNP. It is a method of conception and implementation that integrates maintenance for the life cycle in the considered cryogenics systems. The implementation is achieved by means of the software LabVIEW applied to the specific objectives of the Program for Operative Maintenance in Temporal Dynamic Regime (POMTDR). (author)

  7. Harm reduction program use, psychopathology and medical severity in patients with methadone maintenance treatment.

    Science.gov (United States)

    Martínez-Luna, Nieves Gudelia; Rodríguez-Cintas, Laia; Esojo, Abderraman; Palma-Álvarez, Raúl Felipe; Robles-Martínez, María; Grau-López, Lara; Perea, Marta; Roncero, Carlos

    2018-01-15

    Methadone maintenance programs (MMP) for opioid dependence treatment have been widely used due to their effective therapeutic outcomes. Harm reduction programs (HRP) are complementary programs for severe patients with high risk behaviors and when abstinence is not possible. This study aims to compare patients in MMP that use HRP (MMP-HRP) and patients in MMP who do not use HRP (MMP-NO HRP). The sample was composed of 143 patients (MMP-HRP = 42 vs. MMP-NO HRP = 101). An additional subanalysis was performed with patients under 45 years of age (n = 116; MMP-HRP = 38 vs. MMP-NO HRP = 78). All patients were assessed with an ad hoc socio-demographic questionnaire, EuropASI, SCID-I, and SCID-II. Results show that MMP-HRP patients were younger with more frequent use of intravenous drugs and with a high prevalence of Cluster B personality disorders. MMP-NO HRP patients had lower methadone doses compared to MMP-HRP patients and preferred to use drugs by smoked route more frequently. In the subanalysis of patients under 45, MMP-HRP patients were younger, had a higher prevalence of liver diseases, more intravenous drug use, greater severity on the drug use scale, less social and family support in the suescales of EUROP-ASI than compared to patients under 45 years in the group MMP-NO HRP. In conclusion, MMP-HRP patients are younger compared to MMP-NO HRP patients, they also receive higher doses of methadone and had more intravenous use. The above findings imply that the early onset of high risk drug use and long-term exposure to heroin have more severe outcomes such as higher comorbidities (e.g. infectious diseases, medical and psychiatric disorders), and consequently, these patients are a more vulnerable group with a worse prognosis.

  8. Remote maintenance for a new generation of hot cells

    International Nuclear Information System (INIS)

    Feldman, M.J.; Grant, N.R.

    1987-01-01

    For several years the Consolidated Fuel Reprocessing Program at the Oak Ridge National Laboratory has been developing facility concepts, designing specialized equipment, and testing prototypical hardware for reprocessing spent fuel from fast breeder reactors. The major facility conceptual design, the Hot Experimental Facility, was based on total remote maintenance to increase plant availability and to reduce radiation exposure. This thrust included designing modular equipment to facilitate maintenance and the manipulation necessary to accomplish maintenance. Included in the design repetoire was the development effort in advanced servomanipulator systems, a remote sampling system, television viewing, and a transporter system, television viewing, and a transporter for manipulator positioning. Demonstration of these developed items is currently ongoing, and the technology is available for applications where production operations in highly radioactive environments are required

  9. Perencanaan Kegiatan Maintenance Dengan Metode Reability Centered Maintenance (Rcm) II

    OpenAIRE

    Rachmad Hidayat; Nachnul Ansori; Ali Imron

    2010-01-01

    Maintenance Activity Planning by Reability Centered Maintenance (RCM) II Method. This research discussmaintenance activity by using RCM II method to determine failure function risk at compresor screw. Calculation isgiven to magnitude optimum time maintenance interval by considering the cost maintenance and the cost reparation.From the research results with RPN points out that critical component that needs to get main priority in givemaintenance on compresor screw are bust logistic on timeworn...

  10. Pavement maintenance optimization model using Markov Decision Processes

    Science.gov (United States)

    Mandiartha, P.; Duffield, C. F.; Razelan, I. S. b. M.; Ismail, A. b. H.

    2017-09-01

    This paper presents an optimization model for selection of pavement maintenance intervention using a theory of Markov Decision Processes (MDP). There are some particular characteristics of the MDP developed in this paper which distinguish it from other similar studies or optimization models intended for pavement maintenance policy development. These unique characteristics include a direct inclusion of constraints into the formulation of MDP, the use of an average cost method of MDP, and the policy development process based on the dual linear programming solution. The limited information or discussions that are available on these matters in terms of stochastic based optimization model in road network management motivates this study. This paper uses a data set acquired from road authorities of state of Victoria, Australia, to test the model and recommends steps in the computation of MDP based stochastic optimization model, leading to the development of optimum pavement maintenance policy.

  11. Lean Maintenance Applied to Improve Maintenance Efficiency in Thermoelectric Power Plants

    Directory of Open Access Journals (Sweden)

    Orlando Duran

    2017-10-01

    Full Text Available Thermoelectric power plants consist of a set of critical equipment that require high levels of availability and reliability. Due to this, maintenance of these physical assets is gaining momentum in industry. Maintenance is considered as an activity that contributes to improving the availability, efficiency and productivity of each piece of equipment. Several techniques have been used to achieve greater efficiencies in maintenance, among which we can find the lean maintenance philosophy. Despite the wide diffusion of lean maintenance, there is no structured method that supports the prescription of lean tools applied to the maintenance function. This paper presents the experience gathered in two lean maintenance projects in thermoelectric power plants. The application of lean techniques was based on using a previously developed multicriterial decision making process that uses the Fuzzy Analytic Hierarchy Process (AHP methodology to carry out a diagnosis and prescription tasks. That methodology allowed the prescription of the appropriated lean techniques to resolve the main deficiencies in maintenance function. The results of applying such lean tools show that important results can be obtained, making the maintenance function in thermoelectric power plants more efficient and lean.

  12. Maintenance of reactor safety and control computers at a large government facility

    International Nuclear Information System (INIS)

    Brady, H.G.

    1985-01-01

    In 1950 the US Government contracted the Du Pont Company to design, build, and operate the Savannah River Plant (SRP). At the time, it was the largest construction project ever undertaken by man. It is still the largest of the Department of Energy facilities. In the nearly 35 years that have elapsed, Du Pont has met its commitments to the US Government and set world safety records in the construction and operation of nuclear facilities. Contributing factors in achieving production goals and setting the safety records are a staff of highly qualified personnel, a well maintained plant, and sound maintenance programs. There have been many ''first ever'' achievements at SRP. These ''firsts'' include: (1) computer control of a nuclear rector, and (2) use of computer systems as safety circuits. This presentation discusses the maintenance program provided for these computer systems and all digital systems at SRP. An in-house computer maintenance program that was started in 1966 with five persons has grown to a staff of 40 with investments in computer hardware increasing from $4 million in 1970 to more than $60 million in this decade. 4 figs

  13. Failure and Maintenance Analysis Using Web-Based Reliability Database System

    International Nuclear Information System (INIS)

    Hwang, Seok Won; Kim, Myoung Su; Seong, Ki Yeoul; Na, Jang Hwan; Jerng, Dong Wook

    2007-01-01

    Korea Hydro and Nuclear Power Company has lunched the development of a database system for PSA and Maintenance Rule implementation. It focuses on the easy processing of raw data into a credible and useful database for the risk-informed environment of nuclear power plant operation and maintenance. Even though KHNP had recently completed the PSA for all domestic NPPs as a requirement of the severe accident mitigation strategy, the component failure data were only gathered as a means of quantification purposes for the relevant project. So, the data were not efficient enough for the Living PSA or other generic purposes. Another reason to build a real time database is for the newly adopted Maintenance Rule, which requests the utility to continuously monitor the plant risk based on its operation and maintenance performance. Furthermore, as one of the pre-condition for the Risk Informed Regulation and Application, the nuclear regulatory agency of Korea requests the development and management of domestic database system. KHNP is stacking up data of operation and maintenance on the Enterprise Resource Planning (ERP) system since its first opening on July, 2003. But, so far a systematic review has not been performed to apply the component failure and maintenance history for PSA and other reliability analysis. The data stored in PUMAS before the ERP system is introduced also need to be converted and managed into the new database structure and methodology. This reliability database system is a web-based interface on a UNIX server with Oracle relational database. It is designed to be applicable for all domestic NPPs with a common database structure and the web interfaces, therefore additional program development would not be necessary for data acquisition and processing in the near future. Categorization standards for systems and components have been implemented to analyze all domestic NPPs. For example, SysCode (for a system code) and CpCode (for a component code) were newly

  14. Development and Implementation of a Condition Based Maintenance Program for Geothermal Power Plants; FINAL

    International Nuclear Information System (INIS)

    Steve Miller; Jim Eddy; Murray Grande; Shawn Bratt; Manuchehr Shirmohamadi

    2002-01-01

    This report describes the development of the RCM team, identifying plant assets and developing an asset hierarchy, the development of sample Failure Mode Effects Analysis (FMEAs), identifying and prioritizing plant systems and components for RCM analysis, and identifying RCM/CBM software/hardware vendors. It also includes the Failure Mode Effects Analysis (FMEA) for all Class I Systems, Maintenance Task Assignments, use of Conditioned Based Maintenance (CBM) Tools and Displays of the RCM software System Development to date

  15. Gym-based exercise and home-based exercise with telephone support have similar outcomes when used as maintenance programs in adults with chronic health conditions: a randomised trial

    Directory of Open Access Journals (Sweden)

    Paul Jansons

    2017-07-01

    Trial registration: ACTRN12610001035011. [Jansons P, Robins L, O’Brien L, Haines T (2017 Gym-based exercise and home-based exercise with telephone support have similar outcomes when used as maintenance programs in adults with chronic health conditions: a randomised trial. Journal of Physiotherapy 63: 154–160

  16. Opportunistic or event-driven maintenance at the Stanford Linear Accelerator Center

    International Nuclear Information System (INIS)

    Allen, C.W.; Anderson, S.; Erickson, R.; Linebarger, W.; Sheppard, J.C.; Stanek, M.

    1997-03-01

    The Stanford Linear Accelerator Center (SLAC) uses a maintenance management philosophy that is best described as opportunistic or event-driven. Opportunistic maintenance can be defined as a systematic method of collecting, investigating, pre-planning, and publishing a set of proposed maintenance tasks and acting on them when there is an unscheduled failure or repair ''opportunity''. Opportunistic maintenance can be thought of as a modification of the run-to-fail maintenance management philosophy. This maintenance plan was adopted and developed to improve the overall availability of SLAC's linear accelerator, beam delivery systems, and associated controls, power systems, and utilities. In the late 1980's, as the technical complexity of the accelerator facility increased, variations on a conventional maintenance plan were used with mixed results. These variations typically included some type of regular periodic interruption to operations. The periodic shutdowns and unscheduled failures were additive and resulted in unsatisfactory availability. Maintenance issues are evaluated in a daily meeting that includes the accelerator managers, maintenance supervisors and managers, safety office personnel, program managers, and accelerator operators. Lists of pending maintenance tasks are made available to the general SLAC population by a World Wide Web site on a local internet. A conventional information system which pre-dates the WWW site is still being used to provide paper copies to groups that are not yet integrated into the WWW system. The local internet provides real time maintenance information, allowing people throughout the facility to track progress on tasks with essentially real-time status updates. With the introduction of opportunistic maintenance, the accelerator's availability has been measurably better. This paper will discuss processes, rolls and responsibilities of key maintenance groups, and management tools developed to support opportunistic maintenance

  17. Pavement condition assessment to forecast maintenance program on JKR state roads in Petaling district

    Science.gov (United States)

    Hamsan, R.; Hafiz, H.; Azlan, A.; Keprawi, M. F.; Malik, A. K. A.; Adamuddin, A.; Abdullah, A. H.; Shafie, A. M.

    2018-02-01

    This research allows local authorities to project road maintenance in term of activities and financial expenditure through pavement condition assessment and then Highway Development and Management (HDM-4) analysis. Current form of road maintenance carried out by local authority is on reactive manner where corrective actions were taken based on reports recorded. Some went unrecorded hence causing prolonged damages. This causes the local authority unable to project the required cost to maintain the roads. This affects the socio-economy of the surrounding routes. Hence, it is seen, as preventive maintenance of the roads will provide more feasible option in term of work force and finance to the local authority. To overcome this issue, a preventive model was introduced. This was done through pavement condition assessment (PCA) where analysis was done through HDM-4. Nondestructive test and destructive test were conducted in order to provide an indicator to the road's health. This were then analyzed in HDM-4 where the result was benchmarked with maintenance standard. The scope of this research is set to PCA where DT and NDT were performed on the routes of Petaling and the output is analyzed in HDM-4. The result of this research provides a 10 years forecast maintenance budget in maintaining the roads in Petaling. This allows the local authority to perform good practice in term of maintaining the roads while at the same time helps them in forecasting their budget for the upcoming years. This research will have a strong impact on the local socio-economy as well as local road user confidence towards the authority over good practices. This research can be further expanded to other type of roads as well as highway bridges.

  18. Maintenance management systems

    International Nuclear Information System (INIS)

    Rohan, M. de

    1989-01-01

    This paper is concerned principally with Maintenance Management systems and their effective introduction into organisations. Maintenance improvement is basically a problem of managing the maintenance department in the broadest sense. Improvement does not only lie in the area of special techniques, systems or procedures; although they are valuable tools, but rather in a balanced attack, carefully guided by management. Over recent years, maintenance systems have received the major emphasis and in many instances the selection of the system has become a pre-occupation, whereas the importance of each maintenance function must be recognised and good management practices applied to all maintenance activities. The ingredients for success in the implementation of maintenance management systems are summarised as: having a management committee, clear objectives, project approach using project management techniques and an enthusiastic leader, user managed and data processing supported project, realistic budget and an understanding of the financial audit requirements. (author)

  19. Criteria for maintenance and repair - LMFBR steam generators

    International Nuclear Information System (INIS)

    Essebaggers, J.

    1975-01-01

    The maintenance and repair criteria will be reviewed with respect to the designs presently under construction for the SNR-300 plant. This criteria shall be based upon the philosophy that safety and reliability are of the highest importance at all operating modes, while availability shall be maximized. To maximize the safety of the steam generator, measures have been taken to reduce the possibilities of failure by simplicity in design, choice of material, methods of fabrication and high quality assurance of critical parts of the pressure boundaries. The maintenance and repair program shall meet the same criteria or the intent of these criteria as applied for the original product. (author)

  20. Maintenance training - a modern necessity

    International Nuclear Information System (INIS)

    Bushall, W.

    1987-01-01

    In recent years, there has been an increase in technically advanced systems and equipment and a need for highly skilled and knowledgeable maintenance technicians to maintain them. To implement an effective training program, training groups' and plant staffs' key to success must be cooperation and creativity. This paper deals with plant staff interface and how to effectively conduct performance-based training while holding the line on costs. This paper includes cost effective and innovative measures to produce performance-based training for maintenance disciplines including: Using the plants staff as a resource as subject matter experts in the development and verification of training materials. Using the plant staff as a resource for the construction of training aids. Using salvage and surplus to produce high quality, low cost training aids. Using cutaways for better understanding of he theory of equipment operation. These cost saving practices are currently being used at Gulf States Utilities' River Bend Nuclear Station